Cara Menghitung Berat Besi Hollow

Misalkan:
Panjang Hollow (L) = 6000 mm
Lebar Hollow (W) = 40 mm
Tinggi hollow (H) = 40 mm
Ketebalan (B) = 2 mm
Berat jenis besi = 7850 (Kg/M3)
Berat Jenis besi (BJ) = 7.85 Kg/ 1.000.000 mm3

Berat Hollow = (W+H) X 2 X L X B X BJ


= (40+40)mm x 2 x 6000mm x 2mm x 7.85Kg/1.000.000 mm3
15.072 kg 2.512
AHSP
ANALISA HARGA SATUAN PEKERJAAN
PEMBANGUNAN GEDUNG KAMPUS UIN IMAM BONJOL
PADANG
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

I A.2.2.1 PEKERJAAN PERSIAPAN


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.2.2.1.1 1m1
2 A.2.2.1.2 1m1
3 A.2.2.1.3 1m1
4 A.2.2.1.4 1 m'
5 A.2.2.1.5 1m2
6 A. 2.2.1.6 1m2
7 A.2.2.1.7 1m2
8 A.2.2.1.8 1m2
9 A.2.2.1.9 1 m2
10 A.2.2.1.10 1m2
11 A.2.2.1.11 1 bh
12 A.2.2.1.12 1 m2
13 A.2.2.1.13 1m3
14 A.2.2.1.14 1m3
15 A.2.2.1.14a 1m2
16 A.2.2.1.14b 1m2
17 A.2.2.1.14c 1m2
18 A.2.2.1.14d 1m2
19 A.2.2.1.14e 1m3
20 A.2.2.1.15 1m2
21 A.2.2.1.16 1m2
22 A.2.2.1.17 1m1
23 A.2.2.1.18 1 Bh
24 A.2.2.1.19 1 m2

II A.2.2.2 PEKERJAAN PERSIAPAN


( NON STANDAR )
1 A.2.2.2.1 1 Bulan
2 A.2.2.2.2 1 Bulan
3 A.2.2.2.3 1 Bulan
4 A.2.2.2.4 1 Bulan
5 A.2.2.2.5 1 Unit
6 A.2.2.2.6 1 Hari
7 A.2.2.2.7 1 Orang
8 A.2.2.2.8 1 x lap.
9 A.2.2.2.9 1 Set
10 A.2.2.2.10 1 unit
11 A.2.2.2.11 1 unit
12 A.2.2.2.12 1 Unit
III A.2.3.1 PEKERJAAN TANAH
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.2.3.1.1 1 m³
2 A.2.3.1.2 1 m³
3 A.2.3.1.3 1 m³
4 A.2.3.1.4 1 m³
5 A.2.3.1.5 1 m³
6 A.2.3.1.6 1 m³
7 A.2.3.1.7 1 m²
8 A.2.3.1.8 1 m³
9 A.2.3.1.9 1 m³
10 A.2.3.1.10 1 m³
11 A.2.3.1.11 1 m³

Rekap / HAL 3 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
12 A.2.3.1.12 1 m³
13 A.2.3.1.13 1 m³
14 A.2.3.1.14 1 m³
15 A.2.3.1.15 1 m³
16 A.2.3.1a.1 1 Btg
17 A.2.3.1a.2 1 m2
18 A.2.3.1a.3 1 m2
19 A.2.3.1.16 1m3
20 A.2.3.1.17 1 m3

Rekap / HAL 4 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

IV F PEKERJAAN TANAH DENGAN ALAT BERAT


DIRJEN Binamarga-PERMEN PU NOMOR 28/PR
1 F.1 1 m³
2 F.2 1 m³
3 F.3 1 m³
4 F.4 1 m³
5 TM.04.C 1 m³
6 F.5a 1 m³
7 F.5b 1 m³
8 F.5c 1 m³
9 F.5d 1 m³
13 F.5h 1 m1
14 F.5I 1 m1
V A.3.2.1 PEKERJAAN PONDASI
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.3.2.1 1 1 m³
2 A.3.2.1 2 1 m³
3 A.3.2.1 3 1 m³
4 A.3.2.1 4 1 m³
5 A.3.2.1 5 1 m³
6 A.3.2.1 6 1 m³
7 A.3.2.1 7 1 m³
8 A.3.2.1 8 1 m³
9 A.3.2.1 9 1 m³
10 A.3.2.1 10 1 m³
11 A.3.2.1 11 1 m³
12 A.3.2.1 12 1 m³
13 A.3.2.1 13 1 m³

VI F.04 PEKERJAAN TIANG PANCANG


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 F.04.b 1M'
2 F.04.c 1M'
3 F.04.d 1M'
4 F.04.d1 1M'
5 F.04.d2 1 bh
6 F.04.d2 1 bh
1 Titik
VII A. A.4.1.1 PEKERJAAN BETON
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A. A.4.1..1.4 1 m³
1 A. A.4.1.1.8 1 m³
2 A. A.4.1.1.9 1 m³
3 A. A.4.1.1.10 1 m³
4 A. A.4.1.1.10a 1 m³
5 A. A.4.1.1.10b 1 m³
6 A. A.4.1.1.10c 1 m³
7 A. A.4.1.1.10d 1 m³
8 A. A.4.1.1.10e 1 m³
9 A. A.4.1.1.10f 1 m³
10 A. A.4.1.1.14 1 m³
11 A. A.4.1.1.15 1 m1
12 A. A.4.1.1.16 1 m1
13 A. A.4.1.1.17 1 kg
14 A. A.4.1.1.17a 1 m²
15 A. A.4.1.1.17b 1 m²
Rekap / HAL 5 DARI 616
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
16 A. A.4.1.1.17c 1 m²
17 A. A.4.1.1.17d 1 m²
18 A. A.4.1.1.20 1 m²
19 A. A.4.1.1.21 1 m²
20 A. A.4.1.1.22 1 m²
21 A. A.4.1.1.22a 1 m²
22 A. A.4.1.1.22b 1 m²
23 A. A.4.1.1.23 1 m²
24 A. A.4.1.1.23a 1 m²
25 A. A.4.1.1.23b 1 m²
26 A. A.4.1.1.24 1 m²
27 A. A.4.1.1.25 1 m²
28 A. A.4.1.1.26 1 m²
29 A. A.4.1.1.35 1 m'
30 A. A.4.1.1.36 1 m'
31 A. A.4.1.2.25 1 m'
32 A. A.4.1.2.26 1 m1
33 A. A.4.1.2.27 1 m1
34 A. A.4.1.2.29 1 m3

Rekap / HAL 6 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

VIII A.4.2.1 PEKERJAAN BESI DAN ALUMUNIUM


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.4.2.1 1 1 kg
2 A.4.2.1 2 1 kg
3 A.4.2.1 2.a 1 kg
4 A.4.2.1 2.b 1 kg
5 A.4.2.1 3 1 kg
6 A.4.2.1 4 1 m²
7 A.4.2.1 5 10 cm1
8 A.4.2.1 5a 1 kg
9 A.4.2.1 5b 1 kg
10 A.4.2.1 5c 1 kg
11 A.4.2.1 5d 1 bh
12 A.4.2.1 5e 1 bh
13 A.4.2.1 5g 1 bh
14 A.4.2.1 5h 1 bh
15 A.4.2.1 5i 1 bh
16 A.4.2.1 5j 1 bh
17 A.4.2.1 5k 1 bh
18 A.4.2.1 5l 1 bh
19 A.4.2.1 5m 1 bh
20 A.4.2.1 5n 1 bh
21 A.4.2.1 6 1 m²
22 A.4.2.1 7 1 m²
23 A.4.2.1 8 1 m²
24 A.4.2.1 9 1 m²
25 A.4.2.1 10 1 m²
26 A.4.2.1 11 1 m²
27 A.4.2.1 11a 1 m²
28 A.4.2.1 12 1 m²
29 A.4.2.1 13 1 m²
30 A.4.2.1 13a 1 m²
31 A.4.2.1 14 1 m²
32 A.4.2.1 15 1 m²
33 A.4.2.1 16 1 m²
34 A.4.2.1 17 1 m²
35 A.4.2.1 18 1 m1
36 A.4.2.1 19 1 m1
37 A.4.2.1 23 1 m1
38 A.4.2.1 24 1 m1
39 A.4.2.1 25 1 m1
40 A.4.2.1 26 1 m1
41 A.4.2.1 27 1 Unit
42 A.4.2.1 28 1 m2
43 A.4.2.1 30 1 m²
44 A.4.2.1 31 1 m1
45 A.4.2.1 32 1 m1
46 A.4.2.1 33 1 m'
47 A.4.2.1 34 1 m2
48 A.4.2.1 36 1 m1
49 A.4.2.1 37 1 unit
50 A.4.2.1 39 1 unit
51 A.4.2.1 40 1 unit
52 A.4.2.1 41 1 unit
53 A.4.2.1 42 1 unit
54 A.4.2.1 43 1 unit
Rekap / HAL 7 DARI 616
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
55 A.4.2.1 44 1 unit

56 A.4.2.1 45 1 unit

IX. A.4.4.1 PEKERJAAN DINDING


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.4.4.1 2 1 m²
2 A.4.4.1 4 1 m²
3 A.4.4.1 8 1 m²
4 A.4.4.1 10 1 m²
5 A.4.4.1 11a 1 m²
6 A.4.4.1 E.0016 1 m²
7 A.4.4.1 E.0017 1 m²
8 A.4.4.1 E.0018 1 m²
9 A.4.4.1 E.0019 1 m²
10 A.4.4.1 E.0020 1 m²
11 A.4.4.1 E.0021 1 m²
12 A.4.4.1 E.0022 1 m²
13 A.4.4.1 23 1 m²
14 A.4.4.1 25 1 m2
15 A.4.4.1 26 1 m2
16 A.4.4.1 27 1 m3
17 A.4.4.1 28 1 m²

Rekap / HAL 8 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
X A.4.4.2 PEKERJAAN PLESTERAN
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.4.4.2 1 1 m²
2 A.4.4.2 2 1 m²
3 A.4.4.2 3 1 m²
4 A.4.4.2 4 1 m²
5 A.4.4.2 5 1 m²
6 A.4.4.2 13 1 m²
7 A.4.4.2 14 1 m²
8 A.4.4.2 15 1 m²
9 A.4.4.2 16 1 m²
10 A.4.4.2 20 1 m'
11 A.4.4.2 23 1 m²
12 A.4.4.2 24 1 m²
13 A.4.4.2 25 1 m'
14 A.4.4.2 26 1 m²
15 A.4.4.2 27 1 m²
16 A.4.4.2 28 1 m²

Rekap / HAL 9 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

XI A.4.4.3 PEKERJAAN PENUTUP DINDING & LANTAI


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.4.4.3 34 1 m²
2 A.4.4.3 34a 1 m²
3 A.4.4.3 35 1 m²
4 A.4.4.3 35a 1 m²
5 A.4.4.3 36a 1 m²
6 A.4.4.3 36b 1 m²
7 A.4.4.3 36c 1 m²
8 A.4.4.3 36d 1 m²
9 A.4.4.3 36e 1 m²
10 A.4.4.3 36f 1 m²
11 A.4.4.3 36g 1 m²
12 A.4.4.3 36h 1 m²
13 A.4.4.3 36i 1 m²
14 A.4.4.3 36j 1 m²
15 A.4.4.3 36k 1 m²
16 A.4.4.3 37 1 m²
17 A.4.4.3 39 1 m'
18 A.4.4.3 39a 1 m'
19 A.4.4.3 39b 1 m'
20 A.4.4.3 39c 1 m'
21 A.4.4.3 39d 1 m'
22 A.4.4.3 39e 1 m'
23 A.4.4.3 70 1 m'
24 A.4.4.3 71 1 m'
25 A.4.4.3 72 1 m'
26 A.4.4.3 7 1 m'
27 A.4.4.3 8 1 m'
28 A.4.4.3 9 1 m'
29 A.4.4.3 43 1 m2
30 A.4.4.3 43a 1 m2
31 A.4.4.3 43b 1 m2
32 A.4.4.3 43c 1 m²
33 A.4.4.3 43d 1 m²
34 A.4.4.3 44 1 m²
35 A.4.4.3 45 1 m²
36 A.4.4.3 46 1 m²
37 A.4.4.3 47 1 m²
38 A.4.4.3 16 1 m²
39 A.4.4.3 17 1 m²
40 A.4.4.3 18 1 m²
41 A.4.4.3 19 1 m²
42 A.4.4.3 20 1 m²
43 A.4.4.3 54 1 m²
44 A.4.4.3 54a 1 m²
45 A.4.4.3 54b 1 m²
46 A.4.4.3 54c 1 m²
47 A.4.4.3 54d 1 m²
48 A.4.4.3 54e 1 m²
49 A.4.4.3 54f 1 m²
50 A.4.4.3 55 1 m'
51 A.4.4.3 55a 1 m'
52 A.4.4.3 55b 1 m'
53 A.4.4.3 56 1 m2
54 A.4.4.3 57 1 m2

Rekap / HAL 10 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
55 A.4.4.3 58 1 m2
56 A.4.4.3 58a 1 m2
57 A.4.4.3 59 1 m2
58 A.4.4.3 60 1 m2
59 A.4.4.3 61 1 m2
60 A.4.4.3 61a 1 m2
61 A.4.4.3 62 1 m'
62 A.4.4.3 63 1 m'
63 A.4.4.3 64 1 m²
64 A.4.4.3 65 1 m²
65 A.4.4.3 66 1 m²
66 A.4.4.3 67 1 m²
67 A.4.4.3 68 1 m2
68 A.4.4.3 69 1 m2
69 A.4.4.3 70a 1 m'
70 A.4.4.3 71a 1 m'
71 A.4.4.3 72a 1 m'
72 A.4.4.3 73 1 M²
73 A.4.4.3 74 1 M²
74 A.4.4.3 76 1 M²
75 A.4.4.3 77 1 M²
76 A.4.4.3 78 1 M²
77 A.4.4.3 79 1 m2
78 A.4.4.3 80 1 m2
79 A.4.4.3 55 1 m²
80 44a 1 m²

Rekap / HAL 11 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

XII A.4.5.2 PEKERJAAN PENUTUP ATAP


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.4.5.2 41 1 m2
2 A.4.5.2 41a 1 m2
3 A.4.5.2 41b 1 m2
4 A.4.5.2 42 1 m1
5 A.4.5.2 42.a 1 m1
6 A.4.5.2 42.b 1 m1
7 A.4.5.2 43 1 m2
8 A.4.5.2 44 1 m1
9 A.4.5.2 45 1 m1
10 A.4.5.2 46 1 m1
11 A.4.5.2 47 1 m1
12 A.4.5.2 48 1 m1
13 A.4.5.2 49 1 m1
14 A.4.5.2 50 1 lobang
15 A.4.5.2 51 1 lobang
16 A.4.5.2 52 1 lobang
17 A.4.5.2 53 1 lobang
18 A.4.5.2 54 1 lobang
19 A.4.5.2 55 1 m1
20 A.4.5.2 56 1 m2
21 A.4.5.2 57 1 m1

XIII A.4.6.1 PEKERJAAN KAYU


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.4.6.1 1 1 m³
2 A.4.6.1 2 1 m³
3 A.4.6.1 3 1 m2
4 A.4.6.1 4 1 m2
5 A.4.6.1 5 1 m2
6 A.4.6.1 6 1 m2
7 A.4.6.1 6a 1 m2
8 A.4.6.1 7a 1 m2
9 A.4.6.1 8 1 m2
10 A.4.6.1 9 1 m2
11 A.4.6.1 10 1 m2
12 A.4.6.1 29 1 m1
13 A.4.6.1 30 1 m1
14 A.4.6.1 31 1 m'

Rekap / HAL 12 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

XIV A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN P


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.4.6.2 1 1 set
2 A.4.6.2 2 1 set
3 A.4.6.2 3 1 set
4 A.4.6.2 4 1 set
5 A.4.6.2 4a 1 set
6 A.4.6.2 4b 1 set
7 A.4.6.2 4c 1 set
8 A.4.6.2 4d 1 set
9 A.4.6.2 4e 1 psg
10 A.4.6.2 4f 1 psg
11 A.4.6.2 4g 1 Psg
12 A.4.6.2 4h 1 Psg
13 A.4.6.2 4i 1 Psg
14 A.4.6.2 4j 1 Psg
15 A.4.6.2 4k 1 Psg
16 A.4.6.2 4l 1 Psg
17 A.4.6.2 5 1 bh
18 A.4.6.2 5a 1 bh
19 A.4.6.2 7a 1 psg
20 A.4.6.2 7b 1 psg
21 A.4.6.2 7c 1 psg
22 A.4.6.2 7d 1 psg
23 A.4.6.2 8 1 set
24 A.4.6.2 9 1 set
25 A.4.6.2 10 1 set
26 A.4.6.2 11a 1 Psg
27 A.4.6.2 11b 1 bh
28 A.4.6.2 12a 1 bh
29 A.4.6.2 13 1 Psg
30 A.4.6.2 13a 1 Psg
31 A.4.6.2 13b 1 set
32 A.4.6.2 14 1 set
33 A.4.6.2 14a 1 set
34 A.4.6.2 14b 1 set
35 A.4.6.2 14c 1 set
36 A.4.6.2 14d 1 set
37 A.4.6.2 14e 1 set
38 A.4.6.2 15 1 set
39 A.4.6.2 15a 1 set
40 A.4.6.2 15b 1 set
41 A.4.6.2 15c 1 Set
42 A.4.6.2 15d 1 Set
43 A.4.6.2 15e 1 Set
44 A.4.6.2 15f 1 bh
45 A.4.6.2 15g 1 bh

Rekap / HAL 13 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
46 A.4.6.2 15h 1 bh
47 A.4.6.2 15i 1 bh
48 A.4.6.2 15j 1 set
49 A.4.6.2 15k 1 Psg

Rekap / HAL 14 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
49 A.4.6.2 16 1 m2
50 A.4.6.2 17 1 m2
51 A.4.6.2 17a 1 m2
52 A.4.6.2 17b 1 m2
53 A.4.6.2 17c 1 m2
54 A.4.6.2 18 1 m2
55 A.4.6.2 18a 1 m2
56 A.4.6.2 18b 1 m2
57 A.4.6.2 18c 1 m2
58 A.4.6.2 18d 1 m2
59 A.4.6.2 18e 1 m2
60 A.4.6.2 19 1 m2
61 A.4.6.2 19a 1 m2
62 A.4.6.2 19b 1 m2
63 A.4.6.2 19c 1 m2
64 A.4.6.2 19d 1 m2
65 A.4.6.2 20 1 m2
66 A.4.6.2 24 1 m2
67 A.4.6.2 24a 1 m2
68 A.4.6.2 24b 1 m2
69 A.4.6.2 24c 1 m2
70 A.4.6.2 24d 1 m2
71 A.4.6.2 25 1 m2
72 A.4.6.2 25a 1 m2
73 A.4.6.2 25b 1 m2
74 A.4.6.2 26 1 m2
75 A.4.6.2 27 1 m2
76 A.4.6.2 28 1 m2
77 A.4.6.2 29 1 m2
XV. A.4.5.1 PEKERJAAN LANGIT-LANGIT
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.4.5.1 7 1 m²
2 A.4.5.1 7a 1 m²
3 A.4.5.1 7b 1 m²
4 A.4.5.1 8 1 m²
5 A.4.5.1 9 1 m1
6 A.4.5.1 9a 1 m1
7 A.4.5.1 10 1 m²

8 A.4.5.1 11 1 m²

9 A.4.5.1 12 1 m²

10 A.4.5.1 13 1 m²

11 A.4.5.1 11 1 m²

12 A.4.5.1 12 1 m²
13 A.4.5.1 13 1 m²
14 A.4.5.1 14 1 m²
Rekap / HAL 15 DARI 616
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
15 A.4.5.1 15 1 m²
16 A.4.5.1 16 1 m²
17 A.4.5.1 17 1 m²

18 A.4.5.1 18 1 m²

19 A.4.5.1 19 1 m²
20 A.4.5.1 20 1 m²
21 A.4.5.1 21 1 m1

Rekap / HAL 16 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

XVI. A.4.7.1 PEKERJAAN PENGECATAN


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.4.7.1 1 1 m2
2 A.4.7.1 2 1 m2
3 A.4.7.1 3 1 m2
4 A.4.7.1 4 1 m2
5 A.4.7.1 6 1 m2
6 A.4.7.1 7 1 m2
7 A.4.7.1 8 1 m2
8 A.4.7.1 9 1 m2
9 A.4.7.1 10 1 m2
10 A.4.7.1 10a 1 m2
11 A.4.7.1 10b 1 m2
12 A.4.7.1 10c 1 m2
13 A.4.7.1 10d 1 m2
14 A.4.7.1 10e 1 m2
15 A.4.7.1 10f 1 m2
16 A.4.7.1 10g 1 m2
17 A.4.7.1 11 1 m2
18 A.4.7.1 12 1 m2
19 A.4.7.1 13 1 m2
20 A.4.7.1 14 1 m2
21 A.4.7.1 16 1 m2
22 A.4.7.1 17 1 m2
23 A.4.7.1 18 1 m2

24 A.4.7.1 19 1 m2

25 A.4.7.1 20 1 m2

26 A.4.7.1 21 1 m2
27 A.4.7.1 22 10 m2
28 A.4.7.1 23 10 m2
29 A.4.7.1 24 1 m2
30 A.4.7.1 25 1 m2
31 A.4.7.1 25.a 1M1
32 A.4.7.1 25.b 1M1
33 A.4.7.1 25.c 1M1
34 A.4.7.1 26 1 m2

XVII. A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG


XVII.1 SANITAIR PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
1 A.5.1.1 1 1 Unit
2 A.5.1.1 1a 1 Unit
3 A.5.1.1 2 1 Unit
4 A.5.1.1 2a 1 Unit
5 A.5.1.1 4 1 Unit
6 A.5.1.1 4a 1 Unit
7 A.5.1.1 5 1 Unit
8 A.5.1.1 5a 1 Unit
9 A.5.1.1 5b 1 Unit
10 A.5.1.1 12 1 Unit
11 A.5.1.1 12a 1 Unit
12 A.5.1.1 12b 1 Unit
Rekap / HAL 17 DARI 616
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
13 A.5.1.1 12c 1 Unit
14 A.5.1.1 12d 1 Unit
15 A.5.1.1 12e 1 Unit
16 A.5.1.1 14 1 Unit
17 A.5.1.1 14a 1 bh
18 A.5.1.1 14b 1 bh
19 A.5.1.1 14c 1 Unit
20 A.5.1.1 14d 1 Unit
21 A.5.1.1 14e 1 Unit
22 A.5.1.1 14f 1 Unit
23 A.5.1.1 14g 1 Unit
24 A.5.1.1 14h 1 Unit
25 A.5.1.1 14i 1 Unit
26 A.5.1.1 14j 1 Unit
27 A.5.1.1 14k 1 Unit
28 A.5.1.1 14l 1 Unit
29 A.5.1.1 14m 1 Unit
30 A.5.1.1 14n 1 Unit
31 A.5.1.1 14o 1 Unit
32 A.5.1.1 14p 1 Unit
33 1 Unit

Rekap / HAL 18 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

XVII.1 INSTALASI PEKERJAAN PEMIPAAN DALAM GEDUNG


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
31 A.5.1.1 25 1 M1
32 A.5.1.1 26 1 M1
33 A.5.1.1 27 1 M1
34 A.5.1.1 27a 1 M1
35 A.5.1.1 28 1 M1
36 A.5.1.1 29 1 M1
37 A.5.1.1 30 1 M1
38 A.5.1.1 31 1 M1
39 A.5.1.1 32 1 M1
40 A.5.1.1 32a 1 M1
41 A.5.1.1 32b 1 M1
42 A.5.1.1 32c 1 M1
43 A.5.1.1 32d 1 M1

XVIII. A.6.1.1 PEKERJAAN SALURAN LUAR


1 A.6.1.1 1 1m'
2 A.6.1.1 2 1m'
3 A.6.1.1 3 1m'
4 A.6.1.1 4 1m'
5 A.6.1.1 5 1m'
6 A.6.1.1 6 1m'
7 A.6.1.1 7 1m'
8 A.6.1.1 8 1m'
9 A.6.1.1 9 1m'
10 A.6.1.1 10 1m'
11 A.6.1.1 11 1m'
12 A.6.1.1 12 1m'
13 A.6.1.1 13 1m'
14 A.6.1.1 14 1m'
15 A.6.1.1 15 1m'
16 A.6.1.1 16 1m'
17 A.6.1.1 17 1m'
18 A.6.1.1 18 1m'
19 A.6.1.1 19 1m'
20 A.6.1.1 20 1m'
21 A.6.1.1 21 1m'
22 A.6.1.1 22 1m'
23 A.6.1.1 23 1m'
24 A.6.1.1 24 1m'
25 A.6.1.1 25 1m'
26 A.6.1.1 26 1m'
27 A.6.1.1 27 1m'
28 A.6.1.1 28 1m'
29 A.6.1.1 29 1m'
30 A.6.1.1 30 1bh
31 A.6.1.1 31 1bh
32 A.6.1.1 32 1bh
33 A.6.1.1 33 1bh
34 A.6.1.1 34 1bh
35 A.6.1.1 35 1bh
36 A.6.1.1 36 1bh
37 A.6.1.1 37 1bh
38 A.6.1.1 38 1bh
39 A.6.1.1 39 1bh
Rekap / HAL 19 DARI 616
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
40 A.6.1.1 40 1bh
41 A.6.1.1 41 1bh
42 A.6.1.1 42 1bh

Rekap / HAL 20 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

XIX. 6.P PENETAPAN INDEKS HARGA SATUAN PEK


1 6.P P.01 1 Hr
>>>>>>>>>>> Biaya menggilas macadam /m² =
>>>>>>>>>>> Biaya menggilas amparan / m² =
2 6.P P001a 1 m²
3 6.P P.01b 1 m²
4 6.P P.01c 1 m²
5 6.P P.02 1 m²
6 6.P P.03 1 m²
7 6.P P.04 1 m²
8 6.P P.05 1 m²
9 6.P P.06 1 m²
10 6.P P.07 1 m²
11 6.P P.08 1 m³
12 6.P P.09 1 m³
13 6.P P.010 1 m³
14 6.P P.011 1 m²
15 6.P P.012 1 m²
16 6.P P.013 1 m²
17 6.P P.014 1 m²
18 6.P P.015 1 m²
19 6.P P.016 1 m²
20 6.P P.017 1 m²
21 6.P P.018 1 m³
22 6.P P.019 1 m³
23 6.P P.020 1 m³
24 6.P P.021 1 m'

Rekap / HAL 21 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

XV. A.7.1.1 PEKERJAAN TANAMAN


1 A.7.1.1 1 1 m³
2 A.7.1.1 2 1 m³
3 A.7.1.1 3 1 m³
4 A.7.1.1 4 1 m³
5 A.7.1.1 5 1 lbg
6 A.7.1.1 6 1 m²
7 A.7.1.1 7 1 m²

8 A.7.1.1 8 1 pohon
9 A.7.1.1 9 1 pohon
10 A.7.1.1 10 1 pohon
11 A.7.1.1 11 1 pohon
12 A.7.1.1 12 1 pohon
13 A.7.1.1 13 1 pohon
14 A.7.1.1 14 1 Pohon
15 A.7.1.1 15 1 Pohon
16 A.7.1.1 16 1 Pohon
17 A.7.1.1 17 1 Pohon
18 A.7.1.1 18 1 Pohon
19 A.7.1.1 19 1 Pohon
20 A.7.1.1 20 1 Pohon
21 A.7.1.1 21 1 Pohon
22 A.7.1.1 22 1 Pohon
23 A.7.1.1 23 1 Pohon

24 A.7.1.1 24 1 m'.
25 A.7.1.1 25 1 m'.

26 A.7.1.1 26 1 pohon
27 A.7.1.1 27 1 Pohon

28 A.7.1.1 28 1 pohon
29 A.7.1.1 29 1 pohon
30 A.7.1.1 30 1 pohon
31 A.7.1.1 31 1 pohon
32 A.7.1.1 32 1 pohon
33 A.7.1.1 33 1 pohon
34 A.7.1.1 34 1 pohon
35 A.7.1.1 35 1 pohon
36 A.7.1.1 36 1 pohon
37 A.7.1.1 37 1 rumpun
38 A.7.1.1 38 1 M'
39 A.7.1.1 39 1 pohon
40 A.7.1.1 40 1 pohon
41 A.7.1.1 41 1 pohon
42 A.7.1.1 42 1 rumpun
43 A.7.1.1 43 1 rumpun
44 A.7.1.1 44 1 rumpun
45 A.7.1.1 45 1 pohon
46 A.7.1.1 46 1 pohon
47 A.7.1.1 47 1 pohon
48 A.7.1.1 48 1 pohon
49 A.7.1.1 49 1 Rumpun
50 A.7.1.1 50 1 Rumpun
51 A.7.1.1 51 1 Rumpun

Rekap / HAL 22 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3
52 A.7.1.1 52 1M2.
53 A.7.1.1 53 1M2.
54 A.7.1.1 54 1M2.
55 A.7.1.1 55 1M2.

Rekap / HAL 23 DARI 616


REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO. KODE KOEF/SATUAN/U


1 2 3

XVI. PEKERJAAN NON STANDAR TAMBAHAN


1 1 1 m2
2 43 1m'
3 44 1m'
4 0 1 m2
5 38 1 unit
6 0 1m2
7 59 1 m2
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Pen
57 46 1 unit
58 47 1 unit
59 48 1 bh
60 36 1 m²
61 55b 1 m'
62 29 1 m²
63 77 1 M²
64 60 1 m2
65 49 1 m²

22 A.4.5.1 22 1 m2
50 A.4.4.3 54g 1 m²
51 A.4.4.3 54h 1 m²
22 A.4.5.1 23 1 m2
23 A.4.5.1 24 1 m2

12 A.2.2.2.12 1 bulan
15 F.4.a 1 m³
16 A.4.6.2 30 1 m2
17 A.4.2.1 30a 1 m²
53 A.4.4.3 55c 1 m'
54 A.4.4.3 55c 1 m'
55 A.4.2.1 49 1 m²
56 1 m1
57 1 m²
58 A.4.2.1 P.10 1 m3
59 A.4.2.1 P.11 1 m2
60 A.4.2.1 P.12 1 m2

Rekap / HAL 24 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN PERSIAPAN
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter -
Pembuatan Pagar sementara dari seng gelombang tinggi 2 meter 422,500.00
Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter -
Pengukuran dan Pemasangan Bouwplank 83,700.00
Pembuatan 1 m2 kantor sementara lantai plesteran 1,415,900.00
Pembuatan 1 m2 rumah jaga (konstruksi kayu ) 1,414,300.00
Pembuatan 1 m2 gudang semen dan peralatan 1,095,400.00
Pembuatan 1 m2 bedeng pekerja 1,147,300.00
Pembersihan lapangan dan perataan 18,500.00
Pembuatan steger/perancah dari bambu 457,900.00
Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm 170,800.00
Pembuatan Jalan sementara 184,700.00
Pekerjaan Bongkaran Beton Bertulang 1,425,700.00
Pekerjaan Bongkaran Dinding Tembok Plesteran 712,800.00
Pekerjaan Bongkaran Lantai Ubin / Keramik 5,300.00
Pekerjaan Bongkaran Atap Genteng / Sirap 3,700.00
Pekerjaan Bongkaran Atap Seng 6,600.00
Pekerjaan Bongkaran Rangka Atap Kayu 106,900.00
Pekerjaan Bongkaran Rangka Badan Kayu 959,300.00
Pemasangan pagar kawat jaring galvanis panjang 240 cm 22,600.00
Pemasangan panel beton pracetak 5x50x240 cm untuk pagar 417,900.00
Pekerjaan Pagar BRC T= 1.2 m Pondasi (Batukali + Sloof) Dihitung setiap 2.4 m 2,249,200.00
Pasang papan nama proyek ukuran 120 x 240cm 807,800.00
Jaring pengaman proyek 23,100.00

PEKERJAAN PERSIAPAN
( NON STANDAR )
Penyediaan listrik kerja sementara 30,883,600.00
Penyediaan air kerja sementara ( Selama proyek berjalan ) 4,556,750.00
Penyediaan lift barang sementara 21,885,600.00
Sewa alat tower Crane (Type ST60/15 dengan radius 60 m termasuk Genset, dengan
192,062,836.00
standard mesin 150 KVA)
Mob demob alat pemancangan ( Sub Cont ) 106,721,900.00
Mobilisasi dan Demobilisasi Alat material (Asumsi mobil Colt Diesel) 419,300.00
Mobilisasi tenaga kerja jarak tempuh 200km kebawah 202,100.00
Dokumentasi / Poto Progres 4,253,900.00
Asbuilt dwg.(1 asli + 2 copy) 17,473,500.00
Pondasi untuk tower crane ukuran 5x5x1,5m 125,306,000.00
Sewa Tower Crane Per bulan termasuk Operator, BBM, Genset & Mob Demob 188,296,900.00
Mob demob alat Tower crane, Mobil crane dan Alat berat pengeboran 45,060,800.00
PEKERJAAN TANAH
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Galian Tanah Dalam s/d 1 m manual 78,030.00
Galian Tanah Dalam s/d 2 m manual 96,200.00
Galian Tanah Dalam s/d 3 m manual 114,800.00
Galian Tanah keras Dalam 1 m manual 103,800.00
Galian Tanah Cadas Dalam 1 m manual 157,800.00
Galian Tanah Lumpur Dalam 1 m manual 125,700.00
Pekerjaan Stripping Tebing 1 m 5,800.00
Buang Tanah Sejauh 30 m 34,200.00
Mengurug Kembali Galian 57,800.00
Memadatkan Tanah Per 20 cm 57,800.00
Pengurugan dengan pasir urug 191,500.00

Rekap / HAL 25 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Pasang Lapisan Pudel Campuran 1 KP : 3 PP : 7 TL 336,000.00
Pasang Lapisan Pudel Campuran 1 KP : 5 TL 338,000.00
Lapisan Ijuk Tebal 10 cm, untuk bidang resapan 187,600.00
Urug Sirtu Padat Untuk Peniggian Lantai Bangunan 229,300.00
Cerucuk Kayu Ø 8-10 Cm Panjang 4 m' 56,800.00
Penyemprotan anti rayap untuk pondasi 32,800.00
Styrofoam untuk peredam getaran mesin 23,000.00
Buangan tanah kearea site dengan jarak 100 m 64,200.00
Galian tanah sumuran rata-rata ( Manual ) 119,500.00

Rekap / HAL 26 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN TANAH DENGAN ALAT BERAT


DIRJEN Binamarga-PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Galian Tanah biasa 25,530.00
Galian batu 117,100.00
Galian Struktur dengan kedalaman 0-2m 38,400.00
Galian Struktur dengan kedalaman 2-4m 38,800.00
Pemadatan tanah di lokasi pekerjaan (tanah menggunakan hasil galian setempat) 27,500.00
Timbunan tanah berikut Pemadatan tanah tiap 20 cm (Tanah dari luar) 363,400.00
Urugan Sirtu + pemadatan dengan alat berat 411,214.00
Buangan tanah keluar site 54,100.00
Pemadatan sampai dengan CBR 5% 16,630.00
Pengeboran tanah Ø 60cm ( Pakai mesin ) 564,800.00
Pengeboran tanah Ø80cm ( Pakai mesin ) 657,400.00
PEKERJAAN PONDASI
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Pasang Pondasi Batu Belah 1 : 3 1,018,900.00
Pasang Pondasi Batu Belah 1 : 4 968,900.00
Pasang Pondasi Batu Belah 1 : 5 934,300.00
Pasang Pondasi Batu Belah 1 : 6 910,000.00
Pasang Pondasi Batu Belah 1 : 8 876,600.00
Pasang Pondasi Batu Belah 1 KP : 1PC : 2 PP -
Pasang Pondasi Batu Belah 1 PC : 3KP : 10 PP -
Pasang Pondasi Batu Belah 1/4 PC : 1KP : 4 PP -
Pasang Batu Kosong ( Aanstamping ) 551,600.00
Pasang Bronjong Kawat Batu Kali 820,500.00
Pasang Pondasi Siklop. 60 % Beton Campuran 1 : 2 : 3 2,683,100.00
Pasang Pondasi Sumuran. Dia 100 cm 982,300.00
Pasangan Pondasi Rollag Bata 1:4 1,430,800.00

PEKERJAAN TIANG PANCANG


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan Bidang Sumber Daya Air
Pemancangan Tiang pancang beton 25cm x 25cm 422,402.00
Pemancangan Tiang pancang beton 30cm x 30cm 475,249.00
Pemancangan Tiang pancang beton 40cm x 40cm 751,370.00
Sheet pile baja 605,168.00
Potong/pecah kepala tiang pancang 40cm x 40cm 269,500.00
Potong/pecah kepala tiang pancang 30 x 30 66,000.00
PDA Test + Analisa Capwap berikut Mobilisasi & Demobilisasi alat 35,105,919.20
PEKERJAAN BETON
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Membuat beton mutu fc=21.7 Mpa (K 250), slum (12 ± 2) cm, w/c = 0.56 1,059,500.00
Membuat beton mutu fc=21.7 Mpa (K 250), slum (12 ± 2) cm, w/c = 0.56 1,059,500.00
Membuat beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 1,088,600.00
Membuat beton mutu fc=26.4 Mpa (K 300), slum (12 ± 2) cm, w/c = 0.52 1,097,600.00
Beton K - 300 ( ready mix ) 1,457,500.00
Beton K - 350 ( ready mix ) 1,534,500.00
Beton K - 375 ( ready mix ) 1,308,600.00
Beton K - 400 ( ready mix ) 1,619,400.00
Beton K - 425 ( ready mix ) 1,701,700.00
Beton K - 500 ( ready mix ) 1,749,000.00
Memasang PVC waterstop L=150 mm 133,800.00
Memasang PVC waterstop L=200 mm 173,500.00
Memasang PVC waterstop L=320 mm 32,400.00
Pembesian tiap 1 kg 15,580.00
Pekerjaan Wire Mesh M - 6 73,800.00
Pekerjaan Wire Mesh M - 7 90,900.00
Rekap / HAL 27 DARI 616
NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Pekerjaan Wire Mesh M - 8 110,600.00
Pekerjaan Wire Mesh M - 10 158,000.00
Memasang Bekisting Untuk Pondasi ( 1 x pakai ) 202,100.00
Memasang Bekisting sloof ( 1 x pakai ) 213,900.00
Memasang Bekisting Untuk Kolom 405,800.00
Memasang Bekisting Untuk Kolom ( 2 x pakai ) H < 800 271,700.00
Memasang Bekisting Untuk Kolom ( 2 x pakai ) H > 800 285,800.00
Memasang Bekisting Untuk Balok ( 1 x pakai ) 412,900.00
Memasang Bekisting Untuk Balok ( 2 x pakai ) H < 800 275,300.00
Memasang Bekisting Untuk Balok ( 2 x pakai ) H > 800 289,400.00
Memasang Bekisting Untuk lantai 482,200.00
Memasang Bekisting Untuk Dinding 407,100.00
Memasang Bekisting Untuk Tangga 314,700.00
Kolom Praktis Beton Bertulang (11 x 11) cm 89,900.00
Ring Balok Beton Bertulang/balok lintel (10 x 15) cm 115,000.00
Joint Sealant 32,800.00
Gutter Lebar 20 cm dalam 10 cm 40,200.00
Gutter Lebar 25 cm dalam 10 cm 56,300.00
Grouting tebal 25 mm (Tidak campuran) 15,276,800.00

Rekap / HAL 28 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN BESI DAN ALUMUNIUM


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Memasang besi profil 33,300.00
Memasang rangka kuda-kuda Baja IWF 33,300.00
Memasang Rangka Kuda - Kuda Baja L dan Canal 33,300.00
Memasang Plat Baja t=…… 33,300.00
Mengerjakan Pekerjaan Perakitan 1,205.00
Membuat Pintu Besi Plat Baja Tebal 2 mm Rangkap. Rangka Baja Siku 1,026,900.00
Mengerjakan Pengelasan Dengan Las Listrik 39,800.00
Memasang rangka kuda-kuda Baja IWF (Termasuk pengelasan dan perakitan) 38,400.00
Memasang rangka kuda-kuda Baja C, UNP dan L ( Termasuk pengelasan dan perakitan ) 38,300.00
Memasang Plat baja ( Termasuk pengelasan dan perakitan ) 38,300.00
Angkur baut M12mm 57,200.00
Angkur baut M16mm 75,400.00
Angkur baut M20mm 12,700.00
Angkur baut M36mm 39,400.00
Mur baut M12mm 12,100.00
Mur baut M16mm 24,800.00
Mur baut M19/20mm 30,300.00
Mur baut M22mm 17,900.00
Mur baut M32mm 39,900.00
Walter moor 101,200.00
Membuat Rangka Jendela Besi Scuare Tube (25 x 5) cm 569,600.00
Memasang Pintu Rolling Door Besi 478,700.00
Memasang Pintu Lipat (Folding Door) bahan aluminium 854,900.00
Memasang Jalusi Alumunium 433,900.00
Memasang Rolling Door t=0.8mm + Motor penggerak 1,467,400.00
Memasang Kusen Pintu Alumunium 4" tebal 1.2mm 283,300.00
Memasang Kusen Pintu Alumunium 3" tebal 1.2mm 243,400.00
Memasang Pintu Alumunium Strip Lebar 8 cm 1,288,900.00
Memasang Pintu Kaca Rangka Alumunium 1,159,300.00
Memasang Jendela Kaca Rangka Alumunium 457,500.00
Memasang Venetions Blinds dan Vertical Blinds 179,000.00
Memasang Teralis Besi Strip (2 x 3) mm 658,300.00
Memasang Kawat Nyamuk 112,000.00
Memasang Jendela Nako & tralis 374,700.00
Memasang Talang Datar / Jurai alumunium Lebar 90 cm 2,555,700.00
Memasang Talang 1/2 Lingkaran D-15 cm Alumunium 2,526,600.00
Railling tangga dari kaca dengan hand railling kayu 2,355,800.00
Railling tangga dari pipa Stainles 1,204,000.00
Railling tangga tipe dari pipa BSP 791,100.00
Hand Railling tangga dari pipa stainless steel 566,100.00
Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) : 6,566,900.00
Pasang dinding Zinc - Allumunium colorbond TCT 0.45mm 462,900.00
Pekerjaan Alumunium Composite Panel Exterior 1,665,400.00
Memasang jalusi Alumunium hollow 40x40 tebal 0.35mm 32,100.00
Grill stainless stell l=350 1,045,200.00
Handrail Bar tipe BR-1200 setara Pawling 1,664,100.00
Pasang Buffer plate / Kicking plate Stainless stell Hairline 408,900.00
pasang Memasang "U" Channel Stainless Steel Uk 3x3cm 107,700.00
Memasang tangga monyet dari pipa Stainless steel t=±5m 3,745,100.00
Type P.1 Kusen berikut daun pintu baja & accessories setara Bostinco 15,207,200.00
Type P.2 Kusen berikut daun pintu baja & accessories setara Bostinco 18,844,500.00
Tipe P.3 Pintu baja double fire door finish cat anti karat, Hardware setara Griff -
Tipe P.4 Pintu baja double fire door finish cat anti karat, Hardware setara Griff 19,747,400.00
TipeP.5 Pintu baja single door finish cat anti karat, Hardware setara Griff, setara Bostinco 19,747,400.00
Rekap / HAL 29 DARI 616
NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Tipe P.6 Kusen berikut Pintu baja double shaft steel door finish cat anti karat, Hardware
7,216,400.00
setara Griff, setara Bostinco
Tipe P.7 Kusen berikut Pintu baja single shaft steel door finish cat anti karat, Hardware
4,670,600.00
setara Griff, setara Bostinco

PEKERJAAN DINDING
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1P 437,100.00
Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1P 379,100.00
Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi 278,300.00
Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi 147,100.00
Pasangan Dinding Batako. Campuran Spesi 1PC : 4PP 61,900.00
Pasangan Dinding HB/CB 20.Campuran Spesi 1PC : 3PP -
Pasangan Dinding HB/CB 20.Campuran Spesi 1PC :4PP -
Pasangan Dinding HB/CB 15.Campuran Spesi 1PC :3PP -
Pasangan Dinding HB/CB 15.Campuran Spesi 1PC :4PP -
Pasangan Dinding HB/CB 10.Campuran Spesi 1PC :3PP -
Pasangan Dinding HB 10.Campuran Spesi 1PC 4PP -
Pasangan Dinding Terawang (Roster beton) Uk.(12x11x24)cm.Campuran Spesi 1PC : 3PP -
Pasangan Dinding Terawang (Roster beton) Uk.(12x11x24)cm.Campuran Spesi 1PC : 4PP 171,700.00
Pasangan Dinding Bata ringan tebal 7.5cm dengan mortar siap pakai 232,610.00
Pasangan Dinding Bata ringan tebal 10cm dengan mortar siap pakai 312,720.00
Pasangan Dinding Bata ringan tebal 15cm dengan mortar siap pakai 432,100.00
Panel Dinding fasade ex. Hebel 429,800.00

Rekap / HAL 30 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
PEKERJAAN PLESTERAN
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Plesteran 1PC : 1PP Tebal 15 mm 80,300.00
Plesteran 1PC : 2PP Tebal 15 mm 73,400.00
Plesteran 1PC : 3PP Tebal 15 mm 70,400.00
Plesteran 1PC : 4PP Tebal 15 mm 68,300.00
Plesteran 1PC : 5PP Tebal 15 mm 67,200.00
Plesteran 1PC : 2PP Tebal 20 mm 98,200.00
Plesteran 1PC : 3PP Tebal 20 mm 94,300.00
Plesteran 1PC : 4PP Tebal 20 mm 91,500.00
Plesteran 1PC : 5PP Tebal 20 mm 90,000.00
Plesteran skoneng 1PC : 2PP Lebar 10 mm 78,400.00
Plesteran Ciprat 1PC : 2PP 53,600.00
Finishing Siar Pasangan Dinding Bata Merah ( 20 m' ) 32,000.00
Finishing Siar Pasangan Dinding Conblock Ekspose ( 8 m' ) 15,200.00
Finishing Siar Pasangan Batu Kali Adukan 1 : 2 66,200.00
Finishing Acian 41,100.00
Flesteran + Acian (Pakai perekat jenis mortar) 98,500.00

Rekap / HAL 31 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN PENUTUP DINDING & LANTAI


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Pasang Lantai keramik Ukuran (33 x 33)cm polished setara Roman Gol. A 320,100.00
Pasang Lantai keramik Ukuran (33 x 33)cm unpolished setara Roman Gol. C 359,000.00
Pasang Lantai Keramik Ukuran (30 x 30)cm polished setara Roman Gol. A 294,300.00
Pasang Lantai Keramik Ukuran (30 x 30) cm Unpolished/Anti slip setara Roman Gol. B 328,700.00
Pasang Lantai Keramik Ukuran (20 x 20) cm anti slip setara Roman Gol. B 302,500.00
Pasang Lantai keramik Ukuran (40 x 40) cm Polised Setara Roman Gol. A 313,100.00
Pasang Lantai keramik Ukuran (40 x 40) cm Unpolised Setara Roman Gol. B 320,600.00
Pasang Lantai keramik Ukuran (50 x 50) cm Polised Setara Roman Gol. A 347,200.00
Pasang Lantai keramik Ukuran (60 x 60) cm Unpolised Setara Roman Gol. B 357,700.00
Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Bermotif 617,700.00
Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Matte Bermotif 604,700.00
Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Polos 617,700.00
Pasang Lantai Homogenous Ukuran (40 x 60) cm setara Niro Granit 690,500.00
Pasang Lantai Homogenous Ukuran (60 x 120) cm setara Niro Granit 786,300.00
Pasang Lantai Homogenous Ukuran (20 x 120) cm setara Niro Granit 760,200.00
Pasang Lantai Keramik Ukuran (10 x 33) cm. polished setara Roman Gol. A 439,600.00
Pasang Plint Keramik Ukuran (10 x 20) cm polished setara Roman Gol. A 40,200.00
Pasang Plint Keramik Ukuran (10 x 30) cm polished setara Roman Gol. A 43,500.00
Pasang Plint Keramik Ukuran (10 x 40) cm polished setara Roman Gol. A 38,300.00
Pasang Plint Keramik Ukuran (10 x 50) cm polished setara Roman Gol. A 40,500.00
Pasang Plint Homogeneus Ukuran (10 x 40) cm 114,100.00
Pasang Plint Homogeneus Ukuran (10 x 60) cm 118,900.00
Pasang Stair nozing Keramik Ukuran (10 x 20) cm setara Roman 463,000.00
Pasang Stair nozing Keramik Ukuran (10 x 30) cm setara Roman 138,300.00
Pasang Step tile Keramik Ukuran (30 x 30) cm setara Roman 339,400.00
Pasang Plint Keramik Ukuran (10 x 10) cm -
Pasang Plint Keramik Ukuran (5 x 20) cm -
Pasang Plint Internal Cove Artistik Ukuran (5 x 5 x 20) cm -
Pasang lantai Marmer slab cream Malaga Premium C1 Setara ex. Ujung Pandang 1,182,200.00
Pasang lantai Marmer Ukuran (60x60) cm Polised Setara ex. Ujung Pandang 797,400.00
Pasang lantai Granit macam-macam corakslab setara India 3,732,600.00
Pasang Lantai Homogenous Ukuran (100 x 100) cm polished Setara Niro granit 766,700.00
Pasang Lantai Homogenous Ukuran (100 x 100) cm matte setara Niro Granit 796,400.00
Pasang lantai karpet Heavy Duty 1,005,100.00
Pasang underlayer / Pelapis bawah karpet 145,300.00
Pasang Lantai Parquet kayu Jati 504,100.00
Pasang Lantai kayu ( Gym floor ) 830,300.00
Pasang Dinding Porselin Ukuran (10 x 20) cm -
Pasang Dinding Porselin Ukuran (20 x 20) cm -
Pasang Dinding Keramik artistik Ukuran (10 x 20) cm -
Pasang Dinding Keramik artistik Ukuran (5 x 20) cm -
Pasang Dinding Keramik Ukuran (10 x 20) cm -
Pasang Dinding Keramik Ukuran (20 x 20) cm polished setara Roman Gol. A 347,400.00
Pasang Dinding Keramik Ukuran (20 x 25) cm polished setara Roman Gol. A 358,900.00
Pasang Dinding Keramik Ukuran (30 x 60) cm polished setara Roman Gol. A 399,500.00
Pasang Dinding Keramik Ukuran (20 x 60 ) cm polished setara Roman Gol. B 410,800.00
Pasang Dinding Homogenous Ukuran (30 x 60 ) cm setara Niro Granit 663,400.00
Pasang Dinding Homogenous Ukuran (60 x 60 ) cm setara Niro Granit 663,400.00
Pasang Dinding Homogenous Ukuran (60 x 120 ) cm setara Niro Granit 792,400.00
Pasang dinding Marmer Ukuran (slab ) setara Ujung Pandang 1,305,900.00
Pasang dinding Marmer Ukuran (60x60) cm setara Ujung Pandang 921,100.00
Pasang dinding Granit alam slab setara India 3,849,700.00
Pasang dinding bata pelapis ukuran (3x7x24) cm 422,600.00
Pasang dinding batu paras 257,500.00

Rekap / HAL 32 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Pasang dinding batu tempel hitam 497,000.00
Pasang dinding batu Candi 510,400.00
Pasang Vinyl setara Forbo Sarlon Sparkling 15db t=2,6mm (Harga terpasang) 1,092,200.00
Pasang wall paper, lebar 50cm 282,900.00
Pasang Floor hardener natural ex. Sika Chapdur 80,900.00
Pasang Floor hardener warna ex. Sika Chapdur 115,600.00
Pasang plin vinyl dengan perekat 553,200.00
Pasang plin vinyl dengan perekat 46,400.00
Pemasangan Paving t=6 Cm natural 267,400.00
Pemasangan Paving t=8 Cm natural 294,200.00
Pemasangan Paving t=6 Cm warna 280,800.00
Pemasangan Paving t=8 Cm warna 294,280.00
Lantai grass block - T. 6 cm 359,400.00
Lantai grass block - T. 8 cm 367,100.00
Pasang Stair nozing homogenous tile Ukuran (10 x 20) cm 133,300.00
Pasang Stair nozing homogenous tile Ukuran (10 x 30) cm 128,200.00
Pasang Step nosing alumunium 79,300.00
Screeding tebal 3 cm 66,700.00
Water profing coating 120,900.00
Water profing Rain tite ex. Sika 253,500.00
Pekerjaan meja beton wastafel finish. Batu granit alam 5,109,800.00
Pekerjaan meja beton pantry finish. Keramik 30 x 30 cm berikut dinding 1,725,000.00
Lantai beton sikat ( Pearl stone ) 483,400.00
Epoxy floor lining 2000 um ( 2mm ) 273,100.00
Raised floor bolted stringe steel cementitious understructure type + finis HPL 2,032,800.00
Pasang Carpet tile 100% nylon 1,050,800.00

Rekap / HAL 33 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN PENUTUP ATAP


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Pemasangan 1 m2 atap alumunium 349,400.00
Pasang atap Zinc Allumunium Kiplok CB. 0.50 TCT Colorbond 382,800.00
Pasang atap Zinc Allumunium Standing seam TCT 0.50 mm 796,500.00
Pemasangan 1 m’ nok alumunium 188,200.00
Ridge capping 0.45 TCT Zincalume 940 Width 327,200.00
Longtudinat pascia capping 0.45mm TCT 297,900.00
Pemasangan alumunium foil/sisalation Setara Primary Smart Foam 6.5 mm 198,300.00
Gutter 0.50 TCT zincalume 292,700.00
Talang Vertikal Pralon D 1 1/2" 92,200.00
Talang Vertikal Pralon D 2" 124,200.00
Talang Vertikal Pralon D 2 1/2" 170,200.00
Talang Vertikal Pralon D 3" 233,700.00
Talang Vertikal Pralon d 4" 318,500.00
Sparing Pralon d 1 1/2" 22,100.00
Sparing Pralon d 2" 30,300.00
Sparing Pralon d 2 1/2" 42,300.00
Sparing Pralon d 3" 58,700.00
Sparing Pralon d 4" 80,600.00
Talang jurai atau datar zincalume 119,900.00
Rangka atap baja ringan setara GIGA Steel 175,400.00
Pasang lisplank susun t=50cm calcium cilicate t=8mm rangka hollow 193,200.00

PEKERJAAN KAYU
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Membuat & memasang Kusen Pintu dan Kusen Jendela.Kayu Kelas I 4,333,800.00
Membuat & memasang Kusen Pintu dan Kusen Jendela. Kayu Kelas II & III 8,119,500.00
Membuat & memasang Pintu Klamp Standart. Kayu Kelas II 362,100.00
Membuat & memasang Pintu Klamp sederhana. Kayu Kelas III gudang sementara 332,900.00
Membuat & memasang Daun Pintu Panel.Kayu Kamper Samarinda Kelas II 769,400.00
Membuat & memasang Pintu dan Jendela Kaca. Kayu Kelas I 1,486,200.00
Membuat & memasang Pintu dan Jendela Kaca.Kayu Kamper Samarinda Kelas II 584,100.00
Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kamper Samarinda 857,300.00
Membuat & memasang Daun Pintu Kayu Lapis (Plywood) Rangkap.Rangka Tertutup
688,500.00
Kayu Kamper (lebar Sampai 90 cm)
Membuat & memasang Pintu Plywood Rangkap.Rangka Expose Kayu Kamper Samarinda 752,000.00
Pasang Jalusi Kusen. Kayu Kamper Samarinda 684,000.00
Cope lampu kayu Kamper Samarinda finish cat Duco 274,700.00
Plin kayu kamper Samarinda ukuran 10 x 100mm finish melamik 113,600.00
Pasang dan pembuatan meja Counter Nurse station 4,674,900.00

Rekap / HAL 34 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Kunci pintu tanam antik umum dobel slaght setara mutu menengah -
Kunci pintu tanam antik umum dobel slaght setara mutu biasa -
Kunci pintu kamar mandi -
Pemasangan 1 buah kunci silinder -
Mortice Lock tipe Art 1490.55 + Double Cylinder Type Art 1400.60( untuk pintu engkel ) 715,300.00
Mortice Lock tipe Art 1452.55 + Double Cylinder Type Art 1400.60 ( untuk pintu dobel ) 2,311,400.00
Mortice Lock tipe Art 1450.55 + Double Cylinder Type Art 1400.60 ( untuk pintu geser ) 1,211,400.00
Mortice Lock tipe Art 1490.55 + Double cylinder tipe Art 1477.60 ( untuk pintu Toilet ) 587,700.00
Lever Handle ART 306 SS 342,600.00
Lever Handle ART 352 SS 923,400.00
Pull Handle tipe Art GD 9330 SS-350 311,800.00
Pull Handle tipe Art PH 2296 G-600 1,538,300.00
Flush Handle ( untuk pintu geser ) tipe Art FH 216 300,800.00
Push Pull Art- Arrow 8-1 SS 982,800.00
Pull Handle tipe Art PH 243 L-1200 1,954,200.00
Pull Handle tipe Art PH 243 A-350 1,523,400.00
Hinges Gracia Art 2201 tipe BB 4"x3"x3mm SS 60,900.00
Hinges Gracia Art 2301 tipe 3"x2.5"x2mm SS 48,700.00
Frictionstay top hung tipe 8"/MM2 113,800.00
Frictionstay top hung tipe 12"/MM2 132,500.00
Frictionstay top hung tipe 20"/MM2 217,200.00
Frictionstay top hung tipe 24"/MM2 299,700.00
Pemasangan 1 buah spring knip -
Pemasangan 1 buah kait angin -
Door closer tipe Dorma TS 300 EN 4 RA Silver 361,900.00
Fushbolt tipe Rioby 456/250 mm Silver 219,400.00
Window lock Gracia Locking tipe Art 120 66,500.00
Dust Proof Strike Gracia tipe 115D 66,500.00
Door stop Gracia tipe Art 604 ( Floor ) 115,800.00
Door stop Gracia tipe Art 713 ( Wall ) 66,300.00
Door Selector Art- N250 SS 646,500.00
Track Sliding setara Calfis SD 100/2 Mtr 311,500.00
Track Sliding setara Calfis SD 100/3 Mtr 413,300.00
Channel setara Calfis CL 500/2 Mtr 81,400.00
Channel setara Calfis CL 500/3 Mtr 107,800.00
Roda Sliding Calfis SD 120 max 100Kg 327,500.00
Bracket setara Calfis BK 110 17,600.00
Pemasangan 1 buah kunci lemari -
Floor hinge BTS 65 Complete termasuk top pivot 1,678,200.00
Floor hinge BTS 84 Complete (untuk pintu kaca & alumunium) 2,211,800.00
Top Fact fitting PT-20, Bottom Fact fitting PT-10, Corner Lock PT - 10 LCK 4,092,600.00
Top Fact fitting Pt-40 2,006,300.00
Fact fitting Pt-30 1,376,800.00
Escutcheon tipe Art 901 DR 72,600.00
Shaft door tipe Art 542 147,800.00

Rekap / HAL 35 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Anak kunci shaft door tipe Art 543 106,000.00
Ring Handle shaft door tipe Art RH 8-3 302,900.00
Pivot Hinges tipe Art- 7A / 120 SS 706,700.00
Automatic Fushbolt setara Wilka tipe Gracia 37M 219,400.00

Rekap / HAL 36 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Pasang kaca polos 3 mm 116,000.00
Pasang kaca polos 5 mm 163,100.00
Pasang kaca buram 5 mm 197,200.00
Pasang kaca tinted 5 mm 262,400.00
Pasang kaca clear tempered t= 5 mm 286,600.00
Pasang kaca polos 8 mm 298,300.00
Pasang kaca tinted 8 mm 491,900.00
Pasang kaca stop sol 8 mm 857,400.00
Pasang kaca sandblast 8 mm 730,000.00
Pasang kaca tinted tempered t= 8 mm 695,600.00
Pasang kaca polos tempered t= 8 mm 482,900.00
Pasang kaca polos 12 mm 617,900.00
Pasang kaca warna 12 mm -
Pasang kaca tinted tempered t= 12 mm 1,540,100.00
Pasang kaca polos tempered t= 12 mm 698,200.00
Pasang kaca Reflective Stopsol On Line 12 mm 870,100.00
Pasang kaca cermin 5 mm 472,600.00
Pasang kaca polos 6 mm 217,900.00
Pasang kaca buram 6 mm 265,700.00
Pasang kaca tinted 6 mm 324,900.00
Pasang kaca cermin 6 mm 479,000.00
Pasang kaca clear tempered t= 6 mm 373,300.00
Pasang kaca polos 10 mm 475,300.00
Pasang kaca warna 10 mm -
Pasang kaca clear tempered t= 10 mm 587,500.00
Pasang kaca clear tempered t= 15 mm 4,704,900.00
Pasang kaca clear tempered t= 19 mm 7,426,400.00
Pasang stiker kaca sanblast 151,500.00
Heat-strengthened clear glass t=6mm + clear PVB laminate 1.52mm + Heat-strengthened
2,633,100.00
clear glass t=6mm + rangka alumunium
PEKERJAAN LANGIT-LANGIT
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Pasang Langit-langit Gypsum Board 120 x 240 x 9 mm. Tebal 9 mm 57,000.00
Pasang Langit-langit calcium cilicate Board 120 x 240 Tebal 6 mm 81,800.00
Pasang Langit-langit Gypsum water prof 120 x 240 Tebal 9 mm 69,400.00
Pasang Ceiling Panel tile acustic 12mm (600mmx1200mm) 243,700.00
Pasang List Langit-langit Kayu Profil 29,700.00
Pasang List plafon gyfsum profil 34,300.00
Pasang Langit-langit Gypsum 120 x 240 Tebal 9 mm termasuk rangka hollow galpanis
222,200.00
40x40x0.35mm modul 6ox120 termasuk gantungan
Pasang Langit-langit Gypsum Waterproof 120 x 240 Tebal 9 mm termasuk rangka hollow
234,600.00
galpanis 40x40x0.35mm modul 6ox120 termasuk gantungan
Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka hollow
247,000.00
galpanis 40x40x0.35mm modul 6ox120 termasuk gantungan
Pasang Langit-langit Gypsum 120 x 240 Tebal 9 mm termasuk rangka hollow
178,800.00
40x40x2mm modul 6ox120 termasuk gantungan
Pasang Langit-langit Gypsum Waterproof 120 x 240 Tebal 9 mm termasuk rangka hollow
191,200.00
40x40x2mm modul 6ox120 termasuk gantungan
Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka hollow
203,600.00
galpanis 40x40x2mm modul 6ox120 termasuk gantungan
Dinding Partisi dobel Gypsum 9 mm + Rangka Metal BMSys 223,800.00
Pasang rangka Hollow 50x100 untuk partisi 419,200.00
Rekap / HAL 37 DARI 616
NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Pasang dinding partisi Gypsum Board rangkap .120 x 240 x 9 mm. Tebal 9 mm 108,300.00
Dinding Partisi dobel Gypsum 9 mm + Rangka Hollow 50x100mm 583,500.00
Anti bacterial ceilling setara Bioguard 16mm + Suspension system Prelude standard
419,200.00
t=24mm setara Armstrong
Anti bacterial ceilling setara Bioguard 16mm + Suspension system cleanroom alumunium
660,600.00
setara Armstrong
Accustic tile ceilling setara tipe Dune 16mm + Suspension system Suprafine Grids
419,200.00
t=15mm setara Armstrong
Gypsum board TKA 2 jam t=13mm + Suspension system setara Prelude standard t=24mm 623,000.00
Pasang Shadow line aluminium "U" Channel 17,700.00

Rekap / HAL 38 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN PENGECATAN
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Mengikis/mengerok permukaan cat tembok lama 16,400.00
Mencuci bidang permukaan tembok yang pernah dicat 15,500.00
Mengerok karat cat lama permukaan baja dengan cara manual 16,500.00
Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup 50,300.00
Pelaburan bidang kayu dengan teak oil -
Pelaburan bidang kayu dengan politur 53,200.00
Pelaburan 1 m2 bidang kayu dengan cat residu dan ter -
Pelaburan bidang kayu dengan vernis 53,000.00
Cat tembok Interior ICI Dulux (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 28,000.00
Cat tembok exterior Weathershield ICI Dulux ( 1 lapis cat dasar, 2 lapis cat penutup ) 37,100.00
Pengecatan 1 m2 tembok baru interior ICI Dulux (1 lapis plamuur, 1 lapis cat dasar, 2 lapis 40,500.00
Pengecatan 1 m2 tembok baru interior Anti bakteri (1 lapis plamuur, 1 lapis cat dasar, 2
51,900.00
lapis cat penutup)
Pengecatan plafon/dak beton baru ( lapis cat dasar, 2 lapis cat penutup) 26,200.00
Pengecatan plafon/dak beton baru Weathershield (1 lapis cat dasar, 2 lapis cat penutup) 33,000.00
Pengecatan plafon/dak beton baru jenis cat anti bakteri (1 lapis cat dasar, 2 lapis cat penut 50,200.00
Pengecatan plafon/dak beton baru jenis cat AGE (1 lapis cat dasar, 2 lapis cat penutup) 38,800.00
Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 20,800.00
Melabur tembok dengan kalkarium 10,900.00
Melabur tembok dengan kapur sirih 17,200.00
Melabur tembok lama dengan kapur sirih (pemeliharaan) 7,000.00
Pengecatan permukaan baja dengan meni besi 41,700.00
Pengecatan permukaan baja dengan meni besi dan perancah 72,800.00
Pengecatan permukaan baja lapis seng (galpanis) secara manual sistem 4 lapis cat
25,900.00
konvensional dengan tebal 200 um
Pengecatan permukaan baja lapis seng (galpanis) secara manual sistem 4 lapis cat
31,400.00
mutakhir dengan tebal 200 um
Pengecatan permukaan baja lapis seng (galvanis) secara manual sistem 3 lapis cat
286,500.00
konvensional dengan tebal 200 um
Pengecatan permukaan baja lapis seng (galvani) secara semprot (airless spray) dengan
239,300.00
sistem 1 lapis cat mutakhir dengan tebal 200 um
Pengecatan melamik 267,550.00
Pengecatan Duco bidang kayu baru/besi ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat pen 258,160.00
Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 20,700.00
Pengecatan marka jalan/garis parkir t=2-3mm 935,800.00
Dibulatkan per m1 l=5cm : 46,790.00
Dibulatkan per m1 l=10cm : 93,580.00
Dibulatkan per m1 l=15cm : 140,370.00
Pasang lapisan HPL 186,700.00

PEKERJAAN SANITASI DALAM GEDUNG


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Closet duduk ex. TOTO Type CW 660 NJ / SW660J + Ecowasher TCW 03 SL 7,829,900.00
Closet duduk setara TOTO Type C704L - SW784JP + Ecowasher TCW 03 SL 9,805,100.00
Closet jongkok ex Toto type CE 9 / TV 150 NWV 12 4,251,200.00
Closet jongkok ex. Toto type CE 7 754,300.00
Urinal ex. Toto tipe UW477JNM Muslim type urinal 7,930,900.00
Urinal partition ex. Toto tipe AW115J 2,032,600.00
Wastafel LW649CJ Complete set 4,718,100.00
Wastafel setara TOTO tipe LW 246 J 4,636,900.00
Wastafel setara TOTO tipe LW 103 JT1 4,355,000.00
Kitchen zink setara Standar Royal tipe caroline 1 lobang complete set 651,600.00
Kitchen zink setara Standar Royal tipe Elizabeth 2 lobang complete set 1,048,600.00
Kitchen zink setara Standar Royal tipe angela 1 lobang complete set 819,700.00
Rekap / HAL 39 DARI 616
NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Laundry sink setara TOTO tipe SK322E-T30ARQ13N 12,089,400.00
Service sink setara TOTO tipe SK508-T30ARQ13N 5,410,200.00
Sloop sink setara TOTO tipe SK33-T30ARQ13N 9,076,500.00
Floor drain Ex TOTO Type TX 1 BN 575,600.00
Kran dinding setara TOTO tipe T23BQ13N 533,200.00
Kran zink dinding setara TOTO tipe T30ARQ13N 772,800.00
Shower Spray TB19CSMCR 1,081,300.00
Hand shower setara TOTO tipe TX471SFMBR 3,905,500.00
Fixed Shower Head setara TOTO tipe TX465SMN + TX452SO 2,192,100.00
Paper holder ex. Toto tipe TX703AG 715,400.00
Grab bar Nylon setara tipe KFS 5A-600 1,220,500.00
Grab bar Nylon setara tipe KFS 5B3 6,012,100.00
Grab bar Nylon setara tipe KFS 6A 4,439,100.00
Grab bar Nylon setara tipe KFS 6D-400 2,019,100.00
Grab bar Nylon setara tipe KFS 5A-400 1,153,900.00
Kursi lipat setara tipe KFS 8A 2,218,700.00
Double Robe Hook ex. TOTO Type TS 118 WS 244,000.00
Towel bar setara TOTO tipe TX 4C (L=660 mm) 2,115,900.00
Soap holder/Tempat sabun setara TOTO tipeS 156 NV1 316,100.00
Grab bar Nylon setara tipe KFS 7C 2,418,400.00
Roof drain cast iron 22,600.00

Rekap / HAL 40 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN PEMIPAAN DALAM GEDUNG


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Memasang Pipa PVC Tipe AW Ø 1/2" 71,200.00
Memasang Pipa PVC Tipe AW Ø 3/4" 77,500.00
Memasang Pipa PVC Tipe AW Ø 1" 97,800.00
Memasang Pipa PVC Tipe AW Ø 1 1/4" 118,200.00
Memasang Pipa PVC Tipe AW Ø 1 1/2" 129,100.00
Memasang Pipa PVC Tipe AW Ø 2" 173,800.00
Memasang Pipa PVC Tipe AW Ø 2 1/2" 240,400.00
Memasang Pipa PVC Tipe AW Ø 3" 331,300.00
Memasang Pipa PVC Tipe AW Ø 4" 452,300.00
Memasang Pipa PVC Tipe AW Ø 5" 876,600.00
Memasang Pipa PVC Tipe AW Ø 6" 1,301,100.00
Memasang Pipa PVC Tipe AW Ø 8" 2,350,500.00
Memasang Pipa PVC Tipe AW Ø 10" 4,234,400.00

PEKERJAAN SALURAN LUAR


Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm 46,400.00
Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm 67,200.00
Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 20 cm 95,600.00
Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 30 cm 127,600.00
Memasang pipa beton, diameter 15 cm - 20 cm 238,100.00
Memasang pipa beton, diameter 30 cm SNI - Edisi -2007 331,900.00
Memasang pipa beton, diameter 40 cm 436,000.00
Memasang pipa beton, diameter 50 cm 521,800.00
Memasang pipa beton, diameter 60 cm 659,500.00
Memasang pipa beton, diameter 70 cm 769,400.00
Memasang pipa beton, diameter 80 cm 862,100.00
Memasang pipa beton, diameter 100 cm 1,063,300.00
Memasang Pemasangan Precast U- 200 x 300 cm 284,900.00
Memasang Pemasangan Precast U- 300 x 400 cm 384,500.00
Memasang Pemasangan Precast U- 400 x 600 cm 562,300.00
Memasang Pemasangan Precast U- 500 x 700 cm 681,600.00
Memasang Pemasangan Precast U- 600 x 800 cm 867,000.00
Memasang Pemasangan Precast U- 700 x 900 cm 1,003,100.00
Memasang Pemasangan Precast U- 800 x 1000 cm 1,368,000.00
Memasang Pemasangan Precast U- 1000 x 1000 cm 1,822,800.00
Memasang Pemasangan Precast U- 1200 x 1200 cm 2,143,600.00
Memasang tutup saluran untuk U-300 363,400.00
Memasang tutup saluran untuk U-400 434,200.00
Memasang tutup saluran untuk U-500 505,000.00
Memasang tutup saluran untuk U-600 676,000.00
Memasang tutup saluran untuk U-700 662,000.00
Memasang tutup saluran untuk U-800 840,900.00
Memasang tutup saluran untuk U-1000 1,071,700.00
Memasang tutup saluran untuk U-1200 1,247,700.00
Memasang bak kontrol pas. Bata ukuran (30x30) cm t 35 cm 344,100.00
Memasang bak kontrol pas. Bata ukuran (50x50) cm T. 50 cm 669,700.00
Memasang bak kontrol pas. Bata ukuran (60x60) cm T. 65 cm 1,011,400.00
Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 50x50x100cm termasuk tutup 4,445,500.00
Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 60x60x100cm termasuk tutup 5,276,200.00
Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 70x70x120cm termasuk tutup 7,415,600.00
Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 80x80x130cm termasuk tutup 8,210,600.00
Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 90x90x150cm termasuk tutup 11,471,300.00
Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 100x100x200cm termasuk tutup 19,309,900.00
Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 120x120x200cm termasuk tutup 21,629,100.00
Rekap / HAL 41 DARI 616
NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 140x140x200cm termasuk tutup 26,312,000.00
Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 200x200x300cm termasuk tutup 49,383,900.00
Pembuatan sumur bidang resapan Ø100 kedalaman 2.50m 10,893,000.00

Rekap / HAL 42 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PENETAPAN INDEKS HARGA SATUAN PEKERJAAN JALAN/PERKERASAN


Pekerjaan Menggilas 1,923,079.26
>>>>>>>>>>> Biaya menggilas macadam /m² = 3,052.51
>>>>>>>>>>> Biaya menggilas amparan / m² = 1,526.25
Pekerjaan Macadam T=20 cm 123,500.00
Pekerjaan Macadam T=25 cm 147,400.00
Pekerjaan Macadam T=30 cm 164,600.00
Pekerjaan Onderlag Telford 15/20 1 lapis 109,400.00
Pekerjaan Steenslag 5/7 1 Lapis 35,400.00
Pekerjaan Spleet 3/4 1 Lapis 27,900.00
Pekerjaan Amparan Batu Pecah 2/3 T=5 cm 37,000.00
Pekerjaan Lapisan Pengisi / Penutup 21,800.00
Pekerjaan Pengaspalan Manual 81,800.00
Pekerjaan Base Course A 270,100.00
Pekerjaan Sub base course kelas B 473,500.00
Pekerjaan Sub base course kelas C 454,200.00
Pekerjaan AC-BC / Binder Coarse tebal 13.5 cm 345,200.00
Pekerjaan AC-WC tebal 4 cm 219,500.00
Pekerjaan HRS-WC tebal 3 cm 234,400.00
Pekerjaan Sand Sheet 2cm 25,200.00
Pekerjaan Lapisan Penetrasi 104,300.00
Pekerjaan Teak Coating 30,900.00
Pekerjaan Prime Coat 44,200.00
Pekerjaan Lime stone CBR 7 - 8% 680,400.00
Sub base course kelas B t=15 cm batu crop ( CBR 60% ) 680,400.00
Urug Sirtu Padat Untuk jalan ( CBR 75% ) t=40 cm 494,900.00
Pekerjaan Kansteen ( 15.28.60 ) 163,800.00

Rekap / HAL 43 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN TANAMAN
Pek. Galian lubang tanam pada tanah biasa maks kedalaman 1 M' 78,000.00
Urugan Tanah Humus / Timbunan 194,900.00
Pek. Pemadatan dan pengolahan Tanah urugan 57,800.00
Buangan sisa Pekerjaan keluar Lokasi Max 30 M 34,100.00
Lubang Tanam dan pengolahan untuk Pohon 27,000.00
Penyiraman Tanaman 3,400.00
Pemupukan dan Pendangiran 11,100.00
a. Penanaman pohon peneduh
Penanaman pohon bintaro t=3m 371,500.00
Pohon Saputangan putih 140,400.00
Dadap Merah t=2 - 4 m 248,000.00
Pohon trembesi t = 3,00 m 149,600.00
Angsana Tinggi 100 cm 19,700.00
Pohon Cabefuya Caraiba `t=3m Jenis pohon peneduh 251,900.00
Pohon Janda merana t=300cm 182,800.00
Pohon bungur t=1,5 -3 m 76,900.00
Pohon kiara payung t=300cm 346,300.00
Pohon Kupu-kupu t=300cm 267,600.00
Pohon Mahoni t= 2,5 - 3 m 377,800.00
Pohon Kaliandra T=300cm 231,200.00
Pohon Ketapang laut t= 2 - 4 m 325,000.00
Pohon Ketapang kencana t= 2 - 4 m 346,300.00
Pohon Tanjung t= 2,5 - 3 m 386,500.00
Pohon Damar T= 1 - 2 m 51,700.00
b. Penanaman pohon pagar
Bambu Jepang (2 s/d 3m) 228,000.00
Bambu Kuning (2 s/d 3m) 172,000.00
c. Penanaman pohon berbuah
Pohon Nangka tinggi 100cm 35,400.00
Pohon Sukun t=1,5 - 2 m 67,100.00
d. Penanaman tanaman hias
Kembang Kancing t = 30 - 50 cm 22,400.00
Hanjuang merah t = 50 - 60 cm 24,200.00
Kemuning t = 30 - 35 cm 18,000.00
Anturium GC t = 40 - 50 cm 91,000.00
Pohon kaca piring tinggi 40cm 51,000.00
Palem botol t=100cm 94,900.00
Palem Kurma t=100cm 6,066,200.00
Pohon Liri muscari 54,600.00
Pohon pisang - pisangan 28,300.00
Pohon Lee Kwan Yew 116,300.00
Teh-Tehan ( Duranta) 65,300.00
Pohon Biola cantik t=1 - 2 m 104,000.00
Pohon Jabon t= 70 cm - 80 cm 20,400.00
Pohon Kasia kuning t=1 m 84,000.00
Miona ( 1 Rumpun=1m2 ---25 pohon ) 176,800.00
Lantana polybeg 20 ( 1 Rumpun=1m2 ---25 pohon ) 147,400.00
Tegetes polybeg 20 ( 1 Rumpun=1m2 ---25 pohon ) 147,400.00
Pohon hias bougenville tunggal t = 50 cm 56,600.00
Pohon hias bougenville campur 3 warna t = 100 cm 126,400.00
Pohon hias bougenville sambung t = 50 cm 72,900.00
Perdu Oleander 40,800.00
Azalea Ungu Polybag 30 55,200.00
Azalea Hibrit Polybag 30 90,500.00
Bayam Merah Polybag 30 114,200.00

Rekap / HAL 44 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4
Rumput Gajah 74,900.00
Rumput jepang 90,400.00
Rumput peking 73,500.00
Rumput bermuda ( terpasang belum PPN + keuntungan ) 129,900.00

Rekap / HAL 45 DARI 616


NALISA HARGA SATUAN PEKERJAAN
###
KOEF/SATUAN/URAIAN HARGA STUAN
3 4

PEKERJAAN NON STANDAR TAMBAHAN


Pasang atap asphal Bitumen tipe Marathon 20 495,600.00
Memasang Pemasangan Precast box culvert 40 x 40 x 100 cm 1,145,300.00
Memasang Pemasangan Precast box culvert 60 x 60 x 100 cm 1,831,000.00
Finish permukaan perkerasan beton 13,700.00
Pintu gerbang 35,895,700.00
Pemasangan kawat harmonika 77,600.00
Pemasangan 1 m2 metal clading 243,700.00
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
Tangga servis tipe 1 tipe dari pipa BSP finish cat duco 5,921,900.00
Tangga servis tipe 3 tipe dari pipa BSP finish cat duco 4,436,000.00
Manhole Pelat baja + rangka baja finish cat duco, ukuran 600x600 1,143,400.00
Pasang Lantai Keramik Ukuran (20 x 20) cm setara Roman Gol. A 294,900.00
Pasang plint Marmer Ukuran (10x60) cm setara Ujung Pandang 194,900.00
Finish Trowel 9,100.00
Raised Floor Finish HPL "HPL Steel Panel" By Spescialist 1,145,200.00
Pemasangan Floor metal deck BMT=0.80mm L=1m 214,200.00
Pemasangan 1 m2 rangka besi hollow 1x50x50.2mm, modul 100 x 100 cm 279,600.00

Profiled zincalume metal sheet 374,600.00


Pasang Dinding Keramik Ukuran (30 x 30) cm polished setara Roman Gol. B 350,000.00
Pasang Dinding Keramik Ukuran (50 x 50) cm polished setara Roman Gol. B 398,300.00
Heat-strengthened clear glass t=6mm + clear PVB laminate 1.52mm + Heat-strengthened
3,369,600.00
clear glass t=6mm + rangka alumunium transm & mullio
Alumunium linear ceilling finish powder coating warna/motf kayu 936,100.00

Mobile Crane kapasitas 25 ton 139,051,200.00


Galian Struktur dengan kedalaman >4 m 42,700.00
Heat-strengthened clear glass t=6mm + clear PVB laminate 1.52mm + Heat-strengthened
2,889,300.00
clear glass t=6mm + rangka alumunium
Pekerjaan Alumunium Composite Panel Interior 1,511,000.00
Pasang Marmer tangga Ukuran (slab ) setara Ujung Pandang 1,430,100.00
Pasang step Marmer tangga Ukuran (slab ) setara Ujung Pandang (termasuk grooving
1,803,000.00
dan bullnose)
Pemasangan 1 m2 pagar besi hollow 20x80x3,8 dan 20x80x2,2mm finish cat duco 3,881,300.00
Railling pengaman curtain wall dari pipa Stainles 879,200.00
Pasangan GRC tebal 8 mm 166,810.00
Rabat Beton 699,500.00
Marka Jalan Termoplastik 734,000.00
Marka Jalan Nontermoplastik 629,400.00

Rekap / HAL 46 DARI 616


DAFTAR HARGA SATUAN BAHAN DAN UPAH

NO URAIAN

I. PEKERJA
1 Pekerja
2 Penjaga malam
3 Tukang Aspal
4 Tukang Batu
5 Tukang Besi
6 Tukang Cat
7 Tukang Gypsum
8 Tukang Kayu
9 Tukang Las
10 Tukang Listrik
11 Tukang Taman
12 Tukang Cat Melamik
13 Tukang Pipa
14 Tukang Aluminium
15 Mekanik
16 Kepala Tukang
17 Operator
18 Pembantu Operator
19 Mandor

H-Sat.upah & bahan / HAL 47 DARI 616


DAFTAR HARGA SATUAN BAHAN DAN UPAH

NO URAIAN

II. BAHAN

A BAHAN DASAR
1 Air
2 Abu Batu / Pasir saring
3 Arbocell
4 Bahan Aditif (Calbon, Strorox dll)
5 Bahan Agr. Base Kelas A
6 Bahan Agr. Base Kelas B
7 Bahan Agr. Base Kelas C
8 Bahan Pilihan
9 Bata Merah Kelas 1
10 Bata Merah Bakar Biasa
11 Bata Merah Kelas 2
12 Batako kecil 8x10x20
13 Batu Belah
14 Batu Pecah 5/10
15 Batu Pecah 5/7
16 Batu Pecah 3/4
17 Batu Pecah 2/3
18 Batu Pecah 1/2
19 Batu Split 0-5 mm Agg Halus
20 Batu Split 10-20 mm Agg Sedang
21 Batu Split 20-30 mm Agg Kasar
22 Batu Bronjong
23 Beton ringan ( Celcon block ), Leibel uk. 9 x 19 x 39 cm
24 Chiping
25 Chiping (kg)
26 Curing Compond
27 Elastomer
28 Filler
29 Glass block Lokal 20 x 20 cm lokal
30 Kerikil / Agregat beton
31 Pasir Beton
32 Pasir Pasang
33 Pasir Urug
34 Pasir Halus
35 Plastik Filter
36 Polytene 125 mikron
37 Plastik cor Hitam
38 Sirtu (Pasir Batu)
39 Tanah Urug merah
40 Tanah Subur
41 Tanah Liat
42 Semen PC type I @ 50 kg Product Tiga Roda
43 Semen PC (kg)
44 Semen Merah
45 Semen Putih
46 Semen Warna untuk nat kemasan plastik
H-Sat.upah & bahan / HAL 48 DARI 616
DAFTAR HARGA SATUAN BAHAN DAN UPAH

NO URAIAN

47 Semen Mortar Instant ( MU-202) - Acian


48 Semen Mortar Instant ( MU-302 ) - Plester Premium
49 Semen Mortar Instant ( MU-382 ) - Perekat bata ringan
50 Semen Grouting t=25mm - Sikagrout FM
51 Kapur

B BETON
B.1 BETON READY MIX
1 Beton K - 125
2 Beton K - 150
3 Beton K - 175
4 Beton K - 200
5 Beton K - 225
6 Beton K - 250
7 Beton K - 275
8 Beton K - 300
9 Beton K - 325
10 Beton K - 350
11 Beton K - 375
12 Beton K - 400
13 Beton K - 425
14 Beton K - 500
15 Sewa pompa beton
16 Sewa vibrator

C BAHAN BESI
1 Besi beton polos rata-rata
2 Besi beton ulir rata - rata
3 Baja tulangan (ulir) D39
4 Baja tulangan (ulir) D48
5 Baja tulangan (polos) U24
6 Baja tulangan (polos) U32
7 Baja pelat Tebal 2 mm
8 Baja pelat Tebal 3 mm
9 Baja pelat Tebal 5 mm
10 Pelat Rambu (eng Grade)
11 Pelat Rambu (High I, Grade)
12 Rel Pengaman
13 Besi Strip
14 Pipa Baja
15 Pipa Porus
16 Pipa Galvanis 3"
17 Pipa Galvanis 1,5"
18 Kawat beton
19 Kawat brojong
20 Kawat Jaring Galvanis
21 Kawat las listrik kg
22 Kawat las listrik doos
23 Kawat seng 3 mm
24 Kawat Duri
25 Paku rata - rata H-Sat.upah & bahan / HAL 49 DARI 616
UPAH HARGA DASAR
SAT
Rp. Rp.
TH. 2017
89,320 /Org/Hr 81,200.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
137,445 /Org/Hr 124,950.00
184,800 /Org/Hr 168,000.00
157,850 /Org/Hr 143,500.00
184,800 /Org/Hr 168,000.00
89,320 /Org/Hr 81,200.00
157,850 /Org/Hr 143,500.00
-
-

H-Sat.upah & bahan / HAL 50 DARI 616


UPAH HARGA DASAR
SAT
Rp. Rp.

-
-
-
19,800 m3 18,000.00
298,320 m3 271,200.00
103,070 kg 93,700.00
55,440 ltr 50,400.00
467,500 m3 425,000.00
456,500 m3 415,000.00
330,000 m3 300,000.00
151,580 m3 137,800.00
990 bh 900
770 bh 700
880 bh 800
2,420 bh 2,200.00
178,640 m3 162,400.00
261,140 m3 237,400.00
243,320 m3 221,200.00
269,170 m3 244,700.00
281,380 m3 255,800.00
291,500 m3 265,000.00
287,210 m3 261,100.00
259,490 m3 235,900.00
231,880 m3 210,800.00
187,440 m3 170,400.00
1,929,825 m3 0.01
284,900 m3 259,000.00
149,930 kg 136,300.00
50,820 ltr 46,200.00
706,750 bh 642,500.00
1,650 kg 1,500.00
27,500 bh 25,000.00
159,500 m3 145,000.00
175,450 m3 159,500.00
175,450 m3 159,500.00
121,440 m3 110,400.00
159,610 m3 145,100.00
59,180 m2 53,800.00
25,410 kg 23,100.00
7,700 m2 7,000.00
151,800 m3 138,000.00
137,500 m3 125,000.00
137,203 m3 124,730.00
121,550 m3 110,500.00
66,110 Zak 60,100.00
1,760 kg 1,600.00
4,620 kg 4,200.00
9,680 kg 8,800.00
11,660 kg 10,600.00
H-Sat.upah & bahan / HAL 51 DARI 616
UPAH HARGA DASAR
SAT
Rp. Rp.
3,740 kg 3,400.00
2,186 kg 1,987.50
3,339 kg 3,035.00
11,827,200 m2 10,752,000.00
946,000 m3 860,000.00
-
-
-
921,250 m3 837,500.00
956,120 m3 869,200.00
998,360 m3 907,600.00
1,016,510 m3 924,100.00
1,033,010 m3 939,100.00
1,060,180 m3 963,800.00
1,112,540 m3 1,011,400.00
1,153,020 m3 1,048,200.00
1,175,020 m3 1,068,200.00
1,218,580 m3 1,107,800.00
1,023,000 m3 930,000.00
1,292,060 m3 1,174,600.00
1,363,340 m3 1,239,400.00
1,404,260 m3 1,276,600.00
71,500 m3 65,000.00
5,775 m3 5,250.00
-
-
11,110 kg 10,100.00
11,550 kg 10,500.00
18,480 kg 16,800.00
19,360 kg 17,600.00
13,200 kg 12,000.00
16,060 kg 14,600.00
517,000 m2 470,000.00
797,500 m2 725,000.00
1,210,000 m2 1,100,000.00
749,100 bh 681,000.00
909,040 bh 826,400.00
892,760 m' 811,600.00
13,310 kg 12,100.00
13,750 kg 12,500.00
103,180 m' 93,800.00
209,660 m' 190,600.00
42,900 m' 39,000.00
18,590 kg 16,900.00
28,820 kg 26,200.00
28,820 kg 26,200.00
30,360 kg 27,600.00
157,630 doos 143,300.00
28,380 kg 25,800.00
69,300 m' 63,000.00
18,370 kg 16,700.00 H-Sat.upah & bahan / HAL 52 DARI 616
SEWA ALAT BERAT & MESIN MESIN
No. Jenis Barang / Jasa Satuan Harga (Rp) 1.00
1 Asphalt Finisher 10 T /Jam 776,461.11 776,461.11
2 Asphalt Mixing Plant 30 T /Jam 364,000.00 364,000.00
3 Asphalt Mixing Plant 60 T /Jam 6,209,870.05 6,209,870.05
3 Asphalt Sprayer, Selfprop /jam 71,274.88 71,274.88
4 Asphalt Sprayer, Towed /Jam 26,190.00 26,190.00
5 Asphalt Distributor 4000 litter /Jam 364,598.75 364,598.75
6 Asphalt tanker /Jam 616,485.99 616,485.99
7 Blower /Jam 8,362.20 8,362.20
8 Bulldozer 100-160 HP /jam 651,433.52 651,433.52
9 Cement Tanker 4000 litter /jam 498,656.66 498,656.66
10 Compressor 210 m3 /Jam 173,435.48 173,435.48
11 Compressor Air /Jam 98,844.90 98,844.90
12 Concrete Mixer 0,3-0,6 m3 /Jam 128,831.27 128,831.27
13 Concrete Mixer 350 L /Jam 79,307.84 79,307.84
14 Concrete pump 100 HP /Jam 315,373.05 315,373.05
15 Concrete Vibrator /Jam 50,922.12 50,922.12
16 Concrete Pan Mixer 600 litter /Jam 642,320.57 642,320.57
17 Concrete Saw 14 mm /Jam 53,841.22 53,841.22
18 Cordrill DLL /Jam 213,418.01 213,418.01
19 Cold Recycle 2,2 M /Jam 6,159,697.89 6,159,697.89
20 Crane 10-15 Ton /Jam 457,014.59 457,014.59
21 Alat pancang /Jam 346,661.91 346,661.91
22 Crane on track 35 ton/200HP /Jam 449,962.32 449,962.32
23 Crane on track 75 - 100 Ton /Jam 615,562.98 615,562.98
24 Crusher 30 T/H /Jam 704,469.29 704,469.29
25 Dump Truck /Jam 207,398.88 207,398.88
26 Dump Truck /Jam 437,745.00 437,745.00
27 Dump truk 3 ton /Jam 290,783.82 290,783.82
28 Dump truk 10 ton /Jam 475,167.11 475,167.11
29 Excavator long 1,5 m3 /Jam 321,200.00 321,200.00
30 Excavator long 2 m3 /Jam 624,977.30 624,977.30
31 Fulvimixer 345 HP /Jam 898,763.10 898,763.10
32 Hydraulik Exacavator 1,3 M3 /Jam 316,129.28 316,129.28
33 Hot Recycle 3,0 M /Jam 7,421,296.84 7,421,296.84
34 Jack Hammer /Jam 43,318.56 43,318.56
35 Wheel Loader 2,5 m3 /Jam 231,000.00 231,000.00
36 Low Loader Tractor /Jam 287,247.45 287,247.45
37 Mesin Gilas 3 roda /Jam 219,754.18 219,754.18
38 Mesin Penyemprot Aspal 200 L /Jam 65,288.31 65,288.31
39 Motor Grader 135 HP /Jam 258,500.00 258,500.00
40 Motor Grader 150 HP /Jam 582,421.73 582,421.73
41 Pedestrian roller /Jam 85,313.95 85,313.95
42 Pengaduk Beton 125 L/6 HP /Jam 85,490.21 85,490.21
43 Pengaduk Beton 500 L/20 HP /Jam 85,490.21 85,490.21
44 Peralatan Tractor /Jam 205,422.53 205,422.53
45 Pick Up Truck /Jam 100,866.15 100,866.15
46 Pile driver +hammer 25 HP /Jam 280,389.01 280,389.01
47 Flat Bed Truck /Jam 290,783.82 290,783.82
48 Pneumatic Roller /Jam 274,959.30 274,959.30
49 Screening Plant /Jam 236,463.15 236,463.15
50 Self Vibrator Roller /Jam 206,837.40 206,837.40
51 Sprayer Slee Propeellered /Jam 331,023.00 331,023.00
SEWA ALAT BERAT & MESIN MESIN
No. Jenis Barang / Jasa Satuan Harga (Rp) 1.00
52 Stone crusher /Jam 1,094,144.83 1,094,144.83
53 Spill from paver 2,5 M /Jam 339,691.46 339,691.46
54 Rock Drill breaker /Jam 312,312.51 312,312.51
55 Tamper 4 HP /Jam 50,775.25 50,775.25
56 Tamper 4,7 HP /Jam 57,500.01 57,500.01
57 Tandem Roller 8-18 Ton /Jam 404,666.92 404,666.92
58 Three whell roller 6-8 T /Jam 353,825.92 353,825.92
59 Tire roller 8-10T /Jam 439,502.42 439,502.42
60 Towed Vibrator Rooler /Jam 82,490.10 82,490.10
61 Track loader 2,8m3 /Jam 284,852.12 284,852.12
62 Tractor Wheeled /Jam 116,320.05 116,320.05
63 Trailer 20 ton/175 HP /Jam 418,466.76 418,466.76
64 Vibrator Roller /Jam 404,666.92 404,666.92
65 Vibro Compactor /Jam 220,000.00 220,000.00
66 Water Pump (0 - 5 cm) /Jam 16,273.95 16,273.95
67 Water Pump (70 - 100 mm) /Jam 49,275.66 49,275.66
68 Water Tank Truck /Jam 223,411.65 223,411.65
69 Water tanker 300-4500L /Jam 257,793.83 257,793.83
70 Wheel loader 1-1,6 m3 /Jam 467,182.34 467,182.34
SEWA ALAT BERAT & MESIN MESIN
No. Jenis Barang / Jasa Satuan Harga (Rp) 1.00
SEWA ALAT BERAT & MESIN MESIN
No.
Jenis Barang / Jasa Satuan Harga (Rp) Harga (Rp)
1 Asphalt liquid mixer 40 HP /Jam 82,396.78 82,396.78
2 Asphalt liquid mixer 5 HP /Jam 55,968.41 55,968.41
3 Asphalt liquid mixer 20,000 litter /Jam 118,396.36 118,396.36
4 Aggregat (chip) Speared 3,5 M /Jam 531,202.37 531,202.37
5 Blending equipment 50 HP /Jam 229,756.95 229,756.95
6 Cold milling 248 HP /Jam 55,968.41 55,968.41
7 Cold milling 1000 m /Jam 1,643,150.59 1,643,150.59
8 Concrete breaker 290 HP 20 m3/jam /Jam 830,828.87 830,828.87
9 Condrete mixer (350)/20 HP /Jam 97,667.96 97,667.96
10 Pontoon /Jam 668,422.76 668,422.76
11 Tronton 150 HP /Jam 528,591.26 528,591.26
12 Truk mixer (agitator) 220 HP 5 m3 /Jam 619,328.15 619,328.15
13 Vibrating rammer 4,2 HP 80 kg /Jam 55,770.47 55,770.47
14 Welding set 40 HP /Jam 117,133.87 117,133.87
15 SEWA ALAT PANCANG pemakaian tiang min 400m
b. Biaya pemborongan penyambungan tiang pancang /Jam 98,175.00 98,175.00

c. Biaya pemborongan potong kepala tiang pancang m1 103,950.00 103,950.00


d. Mob Demob + keamanan dan perijinan PP 87,780,000.00 87,780,000.00
16 Tower Crane
Tower Crane 3.6 ton/60m /bulan 75,075,000.00 75,075,000.00
Meet Section crane / section section 866,250.00 866,250.00
Mob Demob PP 40,425,000.00 40,425,000.00
17 Bore pile mechine 150 HP /Jam 791,839.97 791,839.97
18 Bore pile mechine 60 cm /Jam 940,806.28 940,806.28
19 Sewa mobile crane /bulan 56,306,250.00 56,306,250.00
a. Mob Demob + keamanan dan perijinan PP 40,425,000.00 40,425,000.00
16 Genset 60 kVA /Jam 86,625.00 86,625.00
17 Genset 80 kVA /Jam 115,500.00 115,500.00
18 Genset 100 kVA /Jam 288,750.00 288,750.00
19 Genset 150 kVA /Jam 173,250.00 173,250.00
20 Genset 200 kVA /Jam 415,443.64 415,443.64
Perhitungan Biaya Pelaksanaan Tower Crane
Perhitungan harga satuan peralatan
Harga satuan peralatan didasarkan pada biaya tahunan peralatan yang disebut harga sewa peralatan persat
peralatan, serta biaya mobilisasi dan demobilisasi peralatan.
Data Operasional Peralatan
Tower Crane, type ST60/15 dengan radius 60 m termasuk Genset, dengan standard mesin 150 KVA

Data Harga Sewa Peralatan


1 Harga sewa Tower Crane =
2 Harga sewa Genset 150 KVA =
3 Biaya operator =
4 Harga oli =
5 Harga bahan bakar non subsidi =
6 Biaya Mobilisai dan Demobilisasi =
Biaya Erection dan Dismantle =

Perhitungan Biaya Produksi


A. Harga Sewa Tower Crane :
Dengan asumsi :
1 hari = 8 jam ( tanpa lembur )

= 25x8 = 200 jam

Harga Sewa Alat Tower Crane =

Harga Sewa Genset =

=
Maka harga sewa peralatan adalah : =

Analisa tower crane / HAL 56 DARI 616


B. Biaya Operasional Peralatan
B.1 Biaya Bahan Bakar
Kebutuhan bahan bakar
= FOM x FW x PBB x PK
Dimana :
FOM= Faktor Operasi Mesin = 0,8 (asumsi mesin bekerja optimal 80 % )
FW = Faktor Waktu = 0.83 (dengan asumsi kerja 1 jam 50 menit )
PBB = Pemakaian Bahan Bakar, untuk pemakaian solar = 0,2 liter/DK/jam
PK = Kekuatan Mesin = 150 KVA
Maka :
Kebutuhan Bahan Bakar
= 0,8 x 0,83 x 0,2 x 150
= 19,92 liter /jam
= kebutuhan bahan bakar x harga bahan bakar/liter
=

=
B.2 Biaya Pelumas
g= DK x f + c liter/jam
195.50 t
Dimana:
g = banyaknya minyak pelumas yang digunakan
DK = Kekuatan minyak = 150 KVA
F = faktor = ( 0,8 x 0,83 )
c = isi dari carter mesin = 200 liter
t = selang waktu pergantian = 42 jam
maka :
g = 150x(0.8x0.83) + 200
195.50 42
= 5,27 liter/jam
Biaya pemakaian minyak pelumas :

Maka harga operasional peralatan adalah :


Biaya bahan bakar =
Biaya Pelumas =

C. Biaya Operator
Biaya operator =

Maka biaya Tower Crane Per jam :


A. Sewa Peralatan
B. Biaya Operasional
C. Biaya Operator

Biaya tower crane per jam :


jumlah jam dalam 1 bulan :
Maka biaya Tower Crane Per bulan Real cost :
Overhead & keuntungan 10%
Sewa Tower Crane Per bulan termasuk Operator, BBM, Genset & Mob Demob

Analisa tower crane / HAL 57 DARI 616


alatan yang disebut harga sewa peralatan persatuan waktu, biaya operasional

asuk Genset, dengan standard mesin 150 KVA

Rp 75,075,000.00 /bulan
Rp 26,000,000.00 /bulan
Rp 4,620,000.00 /bulan
Rp 30,000.00 /liter
Rp 8,500.00 /liter
Rp 40,425,000.00 PP
Rp 40,000,000.00 /Unit

Rp 75,075,000.00 /bulan
200 jam
Rp 375,375.00 /jam

Rp 26,000,000.00 /bulan
200 jam
Rp 130,000.00 /jam

Rp 375,375.00 /jam
Rp 130,000.00 /jam +
Rp 505,375.00 /jam

Analisa tower crane / HAL 58 DARI 616


19.92 liter/jam
Rp 8,500.00 /liter x
Rp 169,320.00 /jam

5.27 liter/jam
Rp 30,000.00 /liter x
Rp 158,100.00 /jam

Rp 169,320.00 /jam
Rp 158,100.00 /jam +
Rp 327,420.00 /jam

Rp 4,620,000.00 /bulan
Rp 200.00 /jam /
Rp 23,100.00 /jam

Rp 505,375.00 /jam
Rp 327,420.00 /jam
Rp 23,100.00 /jam
Rp 855,895.00 /jam

Rp 855,895.00 /jam
200 jam x
Rp 171,179,000.00 /bulan
Rp 17,117,900.00
Rp 188,296,900.00 /bulan

Analisa tower crane / HAL 59 DARI 616


Perhitungan Biaya Pelaksanaan Tower Crane
Perhitungan harga satuan peralatan
Harga satuan peralatan didasarkan pada biaya tahunan peralatan yang disebut harga sewa peralatan persat
peralatan, serta biaya mobilisasi dan demobilisasi peralatan.
Data Operasional Peralatan
Mobile Crane kapasitas 25 ton

Data Harga Sewa Peralatan


1 Harga sewa Mobile Crane =
2 Biaya operator =
3 Harga oli =
4 Harga bahan bakar non subsidi =
5 Biaya Mobilisai dan Demobilisasi =

Perhitungan Biaya Produksi


A. Harga Sewa Tower Crane :
Dengan asumsi :
1 hari = 8 jam ( tanpa lembur )

= 25x8 = 200 jam

Harga Sewa Alat Tower Crane =

Maka harga sewa peralatan adalah : =

Analisa mobile crane / HAL 60 DARI 616


Perhitungan Biaya Pelaksanaan Tower Crane
Perhitungan harga satuan peralatan
Harga satuan peralatan didasarkan pada biaya tahunan peralatan yang disebut harga sewa peralatan persat
peralatan, serta biaya mobilisasi dan demobilisasi peralatan.

B. Biaya Operasional Peralatan


B.1 Biaya Bahan Bakar
Kebutuhan bahan bakar
= FOM x FW x PBB x PK
Dimana :
FOM= Faktor Operasi Mesin = 0,8 (asumsi mesin bekerja optimal 80 % )
FW = Faktor Waktu = 0.83 (dengan asumsi kerja 1 jam 50 menit )
PBB = Pemakaian Bahan Bakar, untuk pemakaian solar = 0,2 liter/DK/jam
PK = Kekuatan Mesin = 150 KVA
Maka :
Kebutuhan Bahan Bakar
= 0,8 x 0,83 x 0,2 x 150
= 19,92 liter /jam
= kebutuhan bahan bakar x harga bahan bakar/liter
=

=
B.2 Biaya Pelumas
g= DK x f + c liter/jam
195.50 t
Dimana:
g = banyaknya minyak pelumas yang digunakan
DK = Kekuatan minyak = 150 KVA
F = faktor = ( 0,8 x 0,83 )
c = isi dari carter mesin = 200 liter
t = selang waktu pergantian = 42 jam
maka :
g = 150x(0.8x0.83) + 200
195.50 42
= 5,27 liter/jam
Biaya pemakaian minyak pelumas :

Maka harga operasional peralatan adalah :


Biaya bahan bakar =
Biaya Pelumas =

C. Biaya Operator
Biaya operator =

Maka biaya Tower Crane Per jam :


A. Sewa Peralatan
B. Biaya Operasional
C. Biaya Operator

Biaya tower crane per jam :


Analisa mobile crane / HAL 61 DARI 616
Perhitungan Biaya Pelaksanaan Tower Crane
Perhitungan harga satuan peralatan
Harga satuan peralatan didasarkan pada biaya tahunan peralatan yang disebut harga sewa peralatan persat
peralatan, serta biaya mobilisasi dan demobilisasi peralatan.
jumlah jam dalam 1 bulan :
Maka biaya Tower Crane Per bulan Real cost :
Overhead & keuntungan 10%
Sewa Mobile Crane Per bulan termasuk Operator, BBM, Genset & Mob Demob

Analisa mobile crane / HAL 62 DARI 616


alatan yang disebut harga sewa peralatan persatuan waktu, biaya operasional

Rp 56,306,250.00 /bulan
Rp 4,620,000.00 /bulan
Rp 30,000.00 /liter
Rp 8,500.00 /liter
Rp 40,425,000.00 PP

Rp 56,306,250.00 /bulan
200 jam
Rp 281,531.25 /jam

Rp 281,531.25 /jam
Rp - /jam +
Rp 281,531.25 /jam

Analisa mobile crane / HAL 63 DARI 616


alatan yang disebut harga sewa peralatan persatuan waktu, biaya operasional

19.92 liter/jam
Rp 8,500.00 /liter x
Rp 169,320.00 /jam

5.27 liter/jam
Rp 30,000.00 /liter x
Rp 158,100.00 /jam

Rp 169,320.00 /jam
Rp 158,100.00 /jam +
Rp 327,420.00 /jam

Rp 4,620,000.00 /bulan
Rp 200.00 /jam /
Rp 23,100.00 /jam

Rp 281,531.25 /jam
Rp 327,420.00 /jam
Rp 23,100.00 /jam
Rp 632,051.25 /jam

Rp 632,051.25 /jam
Analisa mobile crane / HAL 64 DARI 616
alatan yang disebut harga sewa peralatan persatuan waktu, biaya operasional

200 jam x
Rp 126,410,250.00 /bulan
Rp 12,641,025.00
Rp 139,051,200.00 /bulan

Analisa mobile crane / HAL 65 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4

A. A.2.2.1 PEKERJAAN PERSIAPAN


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan

1 A.2.2.1.1 1m1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter

2 A.2.2.1.2 1m1 Pembuatan Pagar sementara dari seng gelombang tinggi 2 meter
Bahan
Kayu dolken Ø8-10 / p=400 cm 1.250 batang
Semen PC ( 50 kg / zak ) 0.050 zak
Seng gelombang BJLS 28 1.200 lbr
Pasir beton 0.005 m3
Batu split 2x3 0.009 m3
Kayu 5/7 setara lokal (sembarang) 0.072 m3
Paku 0.060 kg
Residu 0.400 liter
Tenaga Kerja
Pekerja 0.200 org/hr
Tukang kayu/batu 0.400 org/hr
Kepala Tukang 0.020 org/hr
mandor 0.020 org/hr

A.2.2.1.2 1m1 Pembuatan Pagar sementara dari seng gelombang tinggi 2 meter

3 A.2.2.1.3 1m1 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter

4 A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank


Bahan
Kayu jenis balok Borneo Super 0.012 m3
Paku rata - rata 0.020 Kg
Kayu jenis papan Borneo Super 0.007 m3
Tenaga Kerja
Pekerja 0.100 org/hr
Tukang Kayu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.005 org/hr

c
A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank

5 A.2.2.1.5 1m2 Pembuatan 1 m2 kantor sementara lantai plesteran


Bahan
Kayu Dolken 1.250 btg
Kayu kelas 2 (kayu lokal) 0.180 m2
Paku 0.080 kg
P.C (Portland Cement) 0.700 zak
Pasir pasang 0.150 m3
Pasir beton 0.100 m3
Koral beton (Batu split ukuran 2x3cm) 0.150 m3
Bata merah 30.000 bh
Seng gelombang BJLS 20 0.250 lbr
Jendela naco 0.200 bh
A.2.2.1 Pek. Persiapan / HAL 66 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4
Kaca polos tebal 5mm 0.080 m2
Kunci tanam loakal 0.150 Bh
Plywood 4mm 0.060 Lbr
Tenaga Kerja
Pekerja 2.000 org/hr
Tukang kayu 2.000 org/hr
Tukang tembok 1.000 org/hr
Kepala Tukang 0.300 org/hr
Mandor 0.050 org/hr

A.2.2.1.5 1m2 Pembuatan 1 m2 kantor sementara lantai plesteran

6 A. 2.2.1.6 1m2 Pembuatan 1 m2 rumah jaga (konstruksi kayu )


Bahan
Kayu Dolken 3.000 btg
Kayu kelas 2 (kayu lokal) 0.276 m2
Paku 0.700 kg
Seng gelombang BJLS 20 1.500 lbr
Tenaga Kerja
Pekerja 1.000 org/hr
Tukang kayu 1.500 org/hr
Kepala Tukang 0.150 org/hr
Mandor 0.050 org/hr

A. 2.2.1.6 1m2 Pembuatan 1 m2 rumah jaga (konstruksi kayu )

A.2.2.1 Pek. Persiapan / HAL 67 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4

7 A.2.2.1.7 1m2 Pembuatan 1 m2 gudang semen dan peralatan


Bahan
Kayu Dolken 1.700 btg
Kayu kelas 2 (kayu lokal) 0.210 m2
Paku 0.300 kg
P.C (Portland Cement) 0.210 zak
Pasir beton 0.030 m3
Koral beton (Batu split ukuran 2x3cm) 0.050 m3
Seng gelombang BJLS 20 1.500 lbr
Seng plat BJLS 20 0.250 lbr
Tenaga Kerja
Pekerja 1.000 org/hr
Tukang kayu 2.000 org/hr
Kepala Tukang 0.500 org/hr
Mandor 0.050 org/hr

A.2.2.1.7 1m2 Pembuatan 1 m2 gudang semen dan peralatan

8 A.2.2.1.8 1m2 Pembuatan 1 m2 bedeng pekerja


Bahan
Kayu Dolken 1.250 btg
Kayu kelas 2 (kayu lokal) 0.186 m2
Paku 0.300 kg
P.C (Portland Cement) 0.360 zak
Pasir beton 0.030 m3
Koral beton (Batu split ukuran 2x3cm) 0.050 m3
Seng gelombang BJLS 20 1.500 lbr
Plywood 4mm 1.350 Lbr
Tenaga Kerja
Pekerja 1.000 org/hr
Tukang kayu 2.000 org/hr
Kepala Tukang 0.200 org/hr
Mandor 0.050 org/hr

A.2.2.1.8 1m2 Pembuatan 1 m2 bedeng pekerja

9 A.2.2.1.9 1 m2 Pembersihan lapangan dan perataan


Tenaga Kerja
Pekerja 0.100 org/hr
Mandor 0.050 org/hr

A.2.2.1.9 1 m2 Pembersihan lapangan dan perataan

10 A.2.2.1.10 1m2 Pembuatan steger/perancah dari bambu


Bahan
Bambu diameter 6-8/600 cm 1.250 btg
Tali ijuk 0.186 m3
Paku 0.300 kg
A.2.2.1 Pek. Persiapan / HAL 68 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4
Tenaga Kerja
Pekerja 1.000 org/hr
Tukang kayu 2.000 org/hr
Kepala Tukang 0.200 org/hr
Mandor 0.050 org/hr

A.2.2.1.10 1m2 Pembuatan steger/perancah dari bambu

11 A.2.2.1.11 1 bh Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm


Bahan
Kayu papan kelas 3 (kayu lokal) 0.036 m2
Kayu balok kelas 3 (kayu lokal) 0.014 m2
Paku 0.080 kg
Tenaga Kerja
Tukang kayu 0.300 org/hr
Mandor 0.030 org/hr

A.2.2.1.11 1 bh Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm

A.2.2.1 Pek. Persiapan / HAL 69 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4
12 A.2.2.1.12 1 m2 Pembuatan Jalan sementara
Bahan :
Batu belah/batu krop 0.150 m3
Batu pecah 5x7cm 0.090 m3
Pasir pasang 0.010 m3
Tenaga Kerja
Pekerja 1.000 0rg/hr
Mandor 0.005 0rg/hr

A.2.2.1.12 1 m2 Pembuatan Jalan sementara

13 A.2.2.1.13 1m3 Pekerjaan Bongkaran Beton Bertulang


Tenaga Kerja
Pekerja 13.334 0rg/hr
Mandor 0.666 0rg/hr

A.2.2.1.13 1m3 Pekerjaan Bongkaran Beton Bertulang

14 A.2.2.1.14 1m3 Pekerjaan Bongkaran Dinding Tembok Plesteran


Tenaga Kerja
Pekerja 6.667 0rg/hr
Mandor 0.333 0rg/hr

A.2.2.1.14 1m3 Pekerjaan Bongkaran Dinding Tembok Plesteran

15 A.2.2.1.14a 1m2 Pekerjaan Bongkaran Lantai Ubin / Keramik


Tenaga Kerja
Pekerja 0.050 0rg/hr
Mandor 0.003 0rg/hr

A.2.2.1.14a 1m2 Pekerjaan Bongkaran Lantai Ubin / Keramik

16 A.2.2.1.14b 1m2 Pekerjaan Bongkaran Atap Genteng / Sirap


Tenaga Kerja
Pekerja 0.020 0rg/hr
Mandor 0.010 0rg/hr

A.2.2.1.14b 1m2 Pekerjaan Bongkaran Atap Genteng / Sirap

17 A.2.2.1.14c 1m2 Pekerjaan Bongkaran Atap Seng


Tenaga Kerja
Pekerja 0.050 0rg/hr
Mandor 0.010 0rg/hr

A.2.2.1 Pek. Persiapan / HAL 70 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4

A.2.2.1.14c 1m2 Pekerjaan Bongkaran Atap Seng

18 A.2.2.1.14d 1m2 Pekerjaan Bongkaran Rangka Atap Kayu


Tenaga Kerja
Pekerja 1.000 0rg/hr
Mandor 0.050 0rg/hr

A.2.2.1.14d 1m2 Pekerjaan Bongkaran Rangka Atap Kayu

19 A.2.2.1.14e 1m3 Pekerjaan Bongkaran Rangka Badan Kayu


Tenaga Kerja
Tukang Kayu 4.000 0rg/hr
Pekerja 2.667 0rg/hr
Kepala Tukang 0.400 0rg/hr
Mandor 0.133 0rg/hr

A.2.2.1.14e 1m3 Pekerjaan Bongkaran Rangka Badan Kayu

A.2.2.1 Pek. Persiapan / HAL 71 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4

20 A.2.2.1.15 1m2 Pemasangan pagar kawat jaring galvanis panjang 240 cm


Bahan
Kawat jaring 0.143 Lembar
Tenaga Kerja
Pekerja 0.042 0rg/hr
Tukang tembok 0.004 org/hr
Kepala Tukang 0.002 0rg/hr
Mandor 0.042 0rg/hr

A.2.2.1.15 1m2 Pemasangan pagar kawat jaring galvanis panjang 240 cm

21 A.2.2.1.16 1m2 Pemasangan panel beton pracetak 5x50x240 cm untuk pagar


Bahan
Panel beton pracetak 0.986 Lembar
Kolom beton pracetak 0.525 Batang
Semen PC 45.000 kg
Pasir beton 0.074 m3
Koral/batu seplit 2x3cm 0.146 m3
Tenaga Kerja
Pekerja 0.375 0rg/hr
Tukang tembok 0.125 org/hr
Kepala Tukang 0.012 0rg/hr
Mandor 0.019 0rg/hr

A.2.2.1.16 1m2 Pemasangan panel beton pracetak 5x50x240 cm untuk pagar

22 A.2.2.1.17 1m1 Pekerjaan Pagar BRC T= 1.2 m Pondasi (Batukali + Sloof) Dihitung setiap 2.4 m
Terpasang :
Galian tanah 1.188 m³
Urugan pasir bawah pondasi 0.132 m³
Aanstamping 0.198 m³
Pondasi batu kali 1PC : 5Ps 0.343 m³
Sloof beton 15/20 0.030 m³
- Beton 0.03
- Besi 6.00
- Bekistin 0.40
Urugan tanah 0.515 m³
Pagar BRC 1.000 bh
Tiang pipa BRC 1.500 bh
Plesteran 1PC : 5Ps 0.960 m²
Pengecatan dinding 0.960 m²

A.2.2.1.17 1m1 Pekerjaan Pagar BRC T= 1.2 m Pondasi (Batukali + Sloof) Dihitung setiap

23 A.2.2.1.18 1 Bh Pasang papan nama proyek ukuran 120 x 240cm


1 Bahan
Kayu kaso dan papan kelas 2 Kamper Medan 0.102 m3
Triplek 6 mm 1.100 lbr

A.2.2.1 Pek. Persiapan / HAL 72 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4
Cat kayu 1.000 kg
Minyak cat 0.500 kg
Paku 0.025 kg
Kwas 2.000 bh

2 Tenaga
Tukang 0.500 oh
Pekerja 0.500 oh
Kepala Tukang 0.050 oh
Mandor 0.005 oh

A.2.2.1.18 1 Bh Pasang papan nama proyek ukuran 120 x 240cm

24 A.2.2.1.19 1 m2 Jaring pengaman proyek


1 Bahan
Jaring pengaman plastik 1.100 m2

2 Tenaga
Pekerja 0.042 oh
Mandor 0.004 oh

A.2.2.1.19 1 m2 Jaring pengaman proyek

A.2.2.1 Pek. Persiapan / HAL 73 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4
A.1 A.2.2.2 PEKERJAAN PERSIAPAN
( NON STANDAR )
Sarana dan prasarana fasilitas kerja sementara
1 A.2.2.2.1 1 Bulan Penyediaan listrik kerja sementara
Sewa Generator 100KVA 1.000 BL
Bahan bakar solar industri 182.000 ltr
Operator (harian perusahaan) 25.000 Hari

A.2.2.2.1 1 Bulan Penyediaan listrik kerja sementara

2 A.2.2.2.2 1 Bulan Penyediaan air kerja sementara ( Selama proyek berjalan )


Bor Pantek + pemipaan dalam sumur 1.000 ls
Pemipaan site PVC Ø1" 45.000 mtr
Tengki air kafasitas 2000 lt 2.000 bh
Dudukan tengki air dari baja siku 1.000 bh
Pompa hisap Grunpos 500 watt 1.000 ls

A.2.2.2.2 1 Bulan iaan air kerja sementara ( Selama proyek berjalan )

3 A.2.2.2.3 1 Bulan Penyediaan lift barang sementara


1 Unit Lift barang + Mesin Diesel 25.000 hari
Operator Lift 25.000 hari
Bahan bakar Premium 182.000 ltr
Bahan pelumas (oil) 2.000 ltr

A.2.2.2.3 1 Bulan Penyediaan lift barang sementara

4 A.2.2.2.4 1 Bulan Sewa alat tower Crane (Type ST60/15 dengan radius 60 m termasuk Genset, deng

Sewa Tower Crane 3.6 ton/60m - 200 jam/bulan 1.000 bln


Asuransi Alat dan Ekspedisi 1.000 ls

A.2.2.2.4 1 Bulan Sewa alat tower Crane (Type ST60/15 dengan radius 60 m termasuk
Genset, dengan standard mesin 150 KVA)

5 A.2.2.2.5 1 Unit Mob demob alat pemancangan ( Sub Cont )


Crane pancang + Hidrolik Hammer 7 ton 1.000 pp
Crane service 1.000 pp
Asuransi Alat dan Ekspedisi 1.000 ls

A.2.2.2.5 1 Unit Mob demob alat pemancangan ( Sub Cont )

6 A.2.2.2.6 1 Hari Mobilisasi dan Demobilisasi Alat material (Asumsi mobil Colt Diesel)
Transfortasi material asumsi mobil Colt Diesel 1.000 unit
A.2.2.1 Pek. Persiapan / HAL 74 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4
Upah muat dan bongkar barang (pekerja) 0.350 hari

A.2.2.2.6 1 Hari Mobilisasi dan Demobilisasi Alat material (Asumsi mobil Colt Diesel)

7 A.2.2.2.7 1 Orang Mobilisasi tenaga kerja jarak tempuh 200km kebawah


Tenaga kerja 200.000 Km
Asuransi 1.000 ls

A.2.2.2.7 1 Orang Mobilisasi tenaga kerja jarak tempuh 200km kebawah

8 A.2.2.2.8 1 Lap Dokumentasi / Poto Progres


Alat / Kamera 1.000 unit
Cuci cetak 432.000 lbr

A.2.2.2.8 1 Lap Dokumentasi / Poto Progres

9 A.2.2.2.9 1 Set Asbuilt dwg.(1 asli + 2 copy)


Cetak kalkir A1 100.000 lbr
Cetak (poto copy) 300.000 kali
Penjilidan 3.000 buku

A.2.2.2.9 1 Set Asbuilt dwg.(1 asli + 2 copy)

A.2.2.1 Pek. Persiapan / HAL 75 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4

10 A.2.2.2.10 1 unit Pondasi untuk tower crane ukuran 5x5x1,5m


Galian :
a. Pengeboran tanah kedalaman 6m 5.000 titik
- Pekerja 0.666 org
- Tukang batu 0.333 org
- Kepala Tukang 0.032 org
- Mandor 0.066 org
- Alat bantu pengeboran ( Bor pile Machine150 HP ) 0.080 jam

b. Galian tanah biasa sedalam 2 meter 52.938 m3


untuk pile cap ( sebelum keuntungan )

c. Pondasi Bore pile dia 40 cm 5.000 titik


Beton K300 ( sebelum keuntungan ) 3.768 m3
Pembesian ( sebelum keuntungan ) 766.091 kg

d. Urugan pasir ( sebelum keuntungan ) 3.025 m3

e. Lantai kerja ( sebelum keuntungan ) 1.513 m3

f. Pile cap 5 x 5 x 1,5m 1.000 titik


Beton K300 ( sebelum keuntungan ) 37.500 m3
Pembesian ( sebelum keuntungan ) 2,129.993 kg
Bekisting ( sebelum keuntungan ) 60.000 m2

A.2.2.2.10 1 unit Pondasi untuk tower crane ukuran 5x5x1,5m

11 1m2 Pemasangan kawat harmonika


Bahan
Kawat harmonika 1.000 m2
Tenaga Kerja
Pekerja 0.042 0rg/hr
Tukang tembok 0.004 org/hr
Kepala Tukang 0.002 0rg/hr
Mandor 0.042 0rg/hr

1m2 Pemasangan kawat harmonika

12 A.2.2.2.10 1 Unit Mob demob alat Tower crane, Mobil crane dan Alat berat pengeboran
Tower crane 1.000 pp
Asuransi Alat dan Ekspedisi 1.000 ls

A.2.2.2.10 1 Unit Mob demob alat Tower crane, Mobil crane dan Alat berat pengeboran

13 A.2.2.2.11 1 Unit Pekerjaan Dewatering


- Galian Tanah Recharge well 59.000 m3
A.2.2.1 Pek. Persiapan / HAL 76 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN
ANALISA
1 2 3 4
- Galian Tanah Dewa tering (DW) 4.000 m3
- Pengeboran Tanah pipa Recharge well 90.000 m1
- Plesteran 1pc : 3ps Recharge well 295.000 m2
- Recharge (RW) Panjang Pipa 15 m ∅ 4" 90.000 m1
- Sewa Pompa Dewatering(DW), Inklino Meter (INK) &
Piezometer (PZ) termasuk Genset dan operator 4.000 unit

A.2.2.2.11 1 Unit Pekerjaan Dewatering

A.2.2.1 Pek. Persiapan / HAL 77 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

304,961.69
37,510.00 46,887.50
66,110.00 3,305.50
69,300.00 83,160.00
175,450.00 877.25
231,880.00 2,086.92
2,158,310.00 155,398.32
18,370.00 1,102.20
30,360.00 12,144.00
79,156.00
89,320.00 17,864.00
137,445.00 54,978.00
157,850.00 3,157.00
157,850.00 3,157.00
Jumlah : 384,117.69
Overhead & keuntungan 10% : 38,411.77
Jumlah : 422,529.46
Jumlah & pembulatan : 422,500.00

2,669,260.00 32,031.12 51,083.34


18,370.00 367.40
2,669,260.00 18,684.82

89,320.00 8,932.00
137,445.00 13,744.50 25,044.25
157,850.00 1,578.50
157,850.00 789.25
Jumlah : 76,127.59
Overhead & keuntungan 10% : 7,612.76
Jumlah : 83,740.35
Jumlah & pembulatan : 83,700.00

641,029.40
37,510.00 46,887.50
2,158,310.00 388,495.80
18,370.00 1,469.60
66,110.00 46,277.00
175,450.00 26,317.50
175,450.00 17,545.00
231,880.00 34,782.00
990.00 29,700.00
45,000.00 11,250.00
14,400.00 2,880.00
A.2.2.1 Pek. Persiapan / HAL 78 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7
108,680.00 8,694.40
150,000.00 22,500.00
70,510.00 4,230.60
646,222.50
89,320.00 178,640.00
137,445.00 274,890.00
137,445.00 137,445.00
157,850.00 47,355.00
157,850.00 7,892.50
Jumlah : 1,287,251.90
Overhead & keuntungan 10% : 128,725.19
Jumlah : 1,415,977.09
Jumlah & pembulatan : 1,415,900.00

788,582.56
37,510.00 112,530.00
2,158,310.00 595,693.56
18,370.00 12,859.00
45,000.00 67,500.00
497,227.50
259,490.00 259,490.00
137,445.00 206,167.50
157,850.00 23,677.50
157,850.00 7,892.50
Jumlah : 1,285,810.06
Overhead & keuntungan 10% : 128,581.01
Jumlah : 1,414,391.07
Jumlah & pembulatan : 1,414,300.00

A.2.2.1 Pek. Persiapan / HAL 79 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

632,013.70
37,510.00 63,767.00
2,158,310.00 453,245.10
18,370.00 5,511.00
66,110.00 13,883.10
175,450.00 5,263.50
231,880.00 11,594.00
45,000.00 67,500.00
45,000.00 11,250.00
363,893.75
2,186.25 2,186.25
137,445.00 274,890.00
157,850.00 78,925.00
157,850.00 7,892.50
Jumlah : 995,907.45
Overhead & keuntungan 10% : 99,590.75
Jumlah : 1,095,498.20
Jumlah & pembulatan : 1,095,400.00

657,189.76
37,510.00 46,887.50
2,158,310.00 401,445.66
18,370.00 5,511.00
66,110.00 23,799.60
175,450.00 5,263.50
231,880.00 11,594.00
45,000.00 67,500.00
70,510.00 95,188.50
385,852.50
71,500.00 71,500.00
137,445.00 274,890.00
157,850.00 31,570.00
157,850.00 7,892.50
Jumlah : 1,043,042.26
Overhead & keuntungan 10% : 104,304.23
Jumlah : 1,147,346.49
Jumlah & pembulatan : 1,147,300.00

89,320.00 8,932.00
157,850.00 7,892.50
Jumlah : 16,824.50
Overhead & keuntungan 10% : 1,682.45
Jumlah : 18,506.95
Jumlah & pembulatan : 18,500.00

83,411.00
40,000.00 50,000.00
150,000.00 27,900.00
18,370.00 5,511.00
A.2.2.1 Pek. Persiapan / HAL 80 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7
332,942.50
18,590.00 18,590.00
137,445.00 274,890.00
157,850.00 31,570.00
157,850.00 7,892.50
Jumlah : 416,353.50
Overhead & keuntungan 10% : 41,635.35
Jumlah : 457,988.85
Jumlah & pembulatan : 457,900.00

109,385.10
2,158,310.00 77,699.16
2,158,310.00 30,216.34
18,370.00 1,469.60
45,969.00
137,445.00 41,233.50
157,850.00 4,735.50
Jumlah : 155,354.10
Overhead & keuntungan 10% : 15,535.41
Jumlah : 170,889.51
Jumlah & pembulatan : 170,800.00

A.2.2.1 Pek. Persiapan / HAL 81 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

77,845.54
292,327.17 43,849.08
358,244.08 32,241.97
175,450.00 1,754.50
90,109.25
89,320.00 89,320.00
157,850.00 789.25
Jumlah : 167,954.79
Overhead & keuntungan 10% : 16,795.48
Jumlah : 184,750.27
Jumlah & pembulatan : 184,700.00

1,296,120.98

89,320.00 1,190,992.88
157,850.00 105,128.10
Jumlah 1,296,120.98
Overhead & keuntungan 10% : 129,612.10
Jumlah : 1,425,733.08
Jumlah & pembulatan : 1,425,700.00

648,060.49

89,320.00 595,496.44
157,850.00 52,564.05
Jumlah 648,060.49
Overhead & keuntungan 10% : 64,806.05
Jumlah : 712,866.54
Jumlah & pembulatan : 712,800.00

4,860.63

89,320.00 4,466.00
157,850.00 394.63
Jumlah 4,860.63
Overhead & keuntungan 10% : 486.06
Jumlah : 5,346.69
Jumlah & pembulatan : 5,300.00

3,364.90

89,320.00 1,786.40
157,850.00 1,578.50
Jumlah 3,364.90
Overhead & keuntungan 10% : 336.49
Jumlah : 3,701.39
Jumlah & pembulatan : 3,700.00

6,044.50

89,320.00 4,466.00
157,850.00 1,578.50
Jumlah 6,044.50
Overhead & keuntungan 10% : 604.45
A.2.2.1 Pek. Persiapan / HAL 82 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7
Jumlah : 6,648.95
Jumlah & pembulatan : 6,600.00

97,212.50

89,320.00 89,320.00
157,850.00 7,892.50
Jumlah 97,212.50
Overhead & keuntungan 10% : 9,721.25
Jumlah : 106,933.75
Jumlah & pembulatan : 106,900.00

872,153.33

137,445.00 549,780.00
89,320.00 238,186.67
157,850.00 63,140.00
157,850.00 21,046.67
Jumlah 872,153.33
Overhead & keuntungan 10% : 87,215.33
Jumlah : 959,368.67
Jumlah & pembulatan : 959,300.00

A.2.2.1 Pek. Persiapan / HAL 83 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

9,321.00
65,000.00 9,321.00
11,246.62
89,320.00 3,751.44
137,445.00 549.78
157,850.00 315.70
157,850.00 6,629.70
Jumlah 20,567.62
Overhead & keuntungan 10% : 2,056.76
Jumlah : 22,624.38
Jumlah & pembulatan : 22,600.00

324,369.55
88,773.30 87,530.47
248,575.80 130,502.30
1,322.20 59,499.00
175,450.00 12,983.30
231,880.00 33,854.48
55,568.98
89,320.00 33,495.00
137,445.00 17,180.63
157,850.00 1,894.20
157,850.00 2,999.15
Jumlah 379,938.52
Overhead & keuntungan 10% : 37,993.85
Jumlah : 417,932.38
Jumlah & pembulatan : 417,900.00

ukali + Sloof) Dihitung setiap 2.4 m

70,936.25 84,272.27
174,102.50 22,981.53
501,415.53 99,280.27
849,373.25 291,335.02
1,173,363.49 35,200.90
963,240.24
15,580.00
194,543.25
24,827.69 12,786.26
360,000.00 360,000.00
698,544.00 1,047,816.00
61,128.23 58,683.11
33,801.52 32,449.45
Jumlah : 2,044,804.82
Overhead & keuntungan 10% : 204,480.48
Jumlah : 2,249,285.30
si (Batukali + Sloof) Dihitung setiap 2.4 m Jumlah & pembulatan : 2,249,200.00

612,312.07
3,332,010.00 341,197.82
146,850.00 161,535.00

A.2.2.1 Pek. Persiapan / HAL 84 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7
57,640.00 57,640.00
19,800.00 9,900.00
18,370.00 459.25
20,790.00 41,580.00

122,064.25
137,445.00 68,722.50
89,320.00 44,660.00
157,850.00 7,892.50
157,850.00 789.25
Jumlah : 734,376.32
Overhead & keuntungan 10% : 73,437.63
Jumlah : 807,813.96
Jumlah & pembulatan : 807,800.00

16,675.01
15,159.10 16,675.01

4,414.41
89,320.00 3,751.44
157,850.00 662.97
Jumlah : 21,089.42
Overhead & keuntungan 10% : 2,108.94
Jumlah : 23,198.36
Jumlah & pembulatan : 23,100.00

A.2.2.1 Pek. Persiapan / HAL 85 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

22,000,000.00 22,000,000.00
8,000.00 1,456,000.00
184,800.00 4,620,000.00
Jumlah : 28,076,000.00
Overhead & keuntungan 10% : 2,807,600.00
Jumlah : 30,883,600.00
Jumlah & pembulatan : 30,883,600.00

7,500,000.00 7,500,000.00
75,000.00 3,375,000.00
3,400,000.00 6,800,000.00
15,000,000.00 15,000,000.00
8,750,000.00 8,750,000.00
Jumlah : 41,425,000.00
Overhead & keuntungan 10% : 4,142,500.00
Jumlah & pembulatan : 45,567,500.00
Jumlah & pembulatan per bulan : 4,556,750.00

550,000.00 13,750,000.00
184,800.00 4,620,000.00
8,000.00 1,456,000.00
35,000.00 70,000.00
Jumlah : 19,896,000.00
Overhead & keuntungan 10% : 1,989,600.00
Jumlah : 21,885,600.00
Jumlah & pembulatan per bulan : 21,885,600.00

gan radius 60 m termasuk Genset, dengan standard mesin 150 KVA)


174,602,580.00
171,179,000.00 171,179,000.00
3,423,580.00 3,423,580.00

Jumlah : 174,602,580.00
Overhead & keuntungan 10% : 17,460,258.00

Jumlah & pembulatan : 192,062,836.00

76,594,735.80 76,594,735.80
20,425,262.00 20,425,262.00
- -
Jumlah : 97,019,997.80
Overhead & keuntungan 10% : 9,701,999.78
Jumlah : 106,721,997.58
Jumlah & pembulatan : 106,721,900.00

350,000.00 350,000.00
A.2.2.1 Pek. Persiapan / HAL 86 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7
89,320.00 31,262.00
Jumlah : 381,262.00
Overhead & keuntungan 10% : 38,126.20
Jumlah : 419,388.20
Jumlah & pembulatan : 419,300.00

875.00 175,000.00
8,750.00 8,750.00
Jumlah : 183,750.00
Overhead & keuntungan 10% : 18,375.00
Jumlah : 202,125.00
Jumlah & pembulatan : 202,100.00

3,500,000.00 3,500,000.00
850.00 367,200.00
Jumlah : 3,867,200.00
Overhead & keuntungan 10% : 386,720.00
Jumlah : 4,253,920.00
Jumlah & pembulatan : 4,253,900.00

150,000.00 15,000,000.00
2,500.00 750,000.00
45,000.00 135,000.00
Jumlah : 15,885,000.00
Overhead & keuntungan 10% : 1,588,500.00
Jumlah : 17,473,500.00
Jumlah & pembulatan : 17,473,500.00

A.2.2.1 Pek. Persiapan / HAL 87 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

920,720.91
89,320.00 59,522.85
137,445.00 45,741.70
157,850.00 5,051.20
157,850.00 10,481.24
791,839.97 63,347.20
Jumlah per m' : 184,144.18

87,491.25 4,631,568.05 4,631,568.05

15,846,354.64
1,325,075.40 4,992,884.11
14,167.34 10,853,470.53

174,102.50 526,660.06 526,660.06

725,619.46 1,097,499.43 1,097,499.43

90,891,770.14
1,325,075.40 49,690,327.50
14,167.34 30,176,340.64
183,751.70 11,025,102.00
Jumlah : 113,914,573.23
Overhead & keuntungan 10% : 11,391,457.32
Jumlah : 125,306,030.55
Jumlah & pembulatan : 125,306,000.00

59,325.22
59,325.22 59,325.22
11,246.62
89,320.00 3,751.44
137,445.00 549.78
157,850.00 315.70
157,850.00 6,629.70
Jumlah 70,571.84
Overhead & keuntungan 10% : 7,057.18
Jumlah : 77,629.03
Jumlah & pembulatan : 77,600.00

40,425,000.00 40,425,000.00
539,442.20 539,442.20
Jumlah : 40,964,442.20
Overhead & keuntungan 10% : 4,096,444.22
Jumlah : 45,060,886.42
Jumlah & pembulatan : 45,060,800.00

70,936.25 4,185,238.75
A.2.2.1 Pek. Persiapan / HAL 88 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7
70,936.25 283,745.00
419,830.98 37,784,788.40
85,746.22 25,295,134.78
411,220.93 37,009,883.54

38,250,000.00 153,000,000.00
Jumlah : 257,558,790.48
Overhead & keuntungan 10% : 25,755,879.05
Jumlah : 283,314,669.52
Jumlah & pembulatan : 283,314,600.00

A.2.2.1 Pek. Persiapan / HAL 89 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN PEKERJAAN KOEF SATUAN
ANALISA
1 2 3 4

A A.2.3.1 PEKERJAAN TANAH


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
1 A.2.3.1.1 1 m³ Galian Tanah Dalam s/d 1 m manual

Tenaga Kerja
Pekerja 0.750 org/hr
Mandor 0.025 org/hr

A.2.3.1.1 1 m³ Galian Tanah Dalam s/d 1 m manual

2 A.2.3.1.2 1 m³ Galian Tanah Dalam s/d 2 m manual

Tenaga Kerja
Pekerja 0.900 org/hr
Mandor 0.045 org/hr

A.2.3.1.2 1 m³ Galian Tanah Dalam s/d 2 m manual

3 A.2.3.1.3 1 m³ Galian Tanah Dalam s/d 3 m manual

Tenaga Kerja
Pekerja 1.050 org/hr
Mandor 0.067 org/hr

A.2.3.1.3 1 m³ Galian Tanah Dalam s/d 3 m manual

4 A.2.3.1.4 1 m³ Galian Tanah keras Dalam 1 m manual

Tenaga Kerja
Pekerja 1.000 org/hr
Mandor 0.032 org/hr

A.2.3.1.4 1 m³ Galian Tanah keras Dalam 1 m manual

5 A.2.3.1.5 1 m³ Galian Tanah Cadas Dalam 1 m manual

Tenaga Kerja
Pekerja 1.500 org/hr
Mandor 0.060 org/hr

A.2.3.1.5 1 m³ Galian Tanah Cadas Dalam 1 m manual

6 A.2.3.1.6 1 m³ Galian Tanah Lumpur Dalam 1 m manual

A.2.3.1 Als-Pek.Tanah / HAL 90 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN PEKERJAAN KOEF SATUAN
ANALISA
1 2 3 4

Tenaga Kerja
Pekerja 1.200 org/hr
Mandor 0.045 org/hr

A.2.3.1.6 1 m³ Galian Tanah Lumpur Dalam 1 m manual

A.2.3.1 Als-Pek.Tanah / HAL 91 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN PEKERJAAN KOEF SATUAN
ANALISA
1 2 3 4

7 A.2.3.1.7 1 m² Pekerjaan Stripping Tebing 1 m

Tenaga Kerja
Pekerja 0.050 org/hr
Mandor 0.005 org/hr

A.2.3.1.7 1 m² Pekerjaan Stripping Tebing 1 m

8 A.2.3.1.8 1 m³ Buang Tanah Sejauh 30 m

Tenaga Kerja
Pekerja 0.330 org/hr
Mandor 0.010 org/hr

A.2.3.1.8 1 m³ Buang Tanah Sejauh 30 m

9 A.2.3.1.9 1 m³ Mengurug Kembali Galian

Pekerja 0.500 org/hr


Mandor 0.050 org/hr

A.2.3.1.9 1 m³ Mengurug Kembali Galian

10 A.2.3.1.10 1 m³ Memadatkan Tanah Per 20 cm

Tenaga Kerja
Pekerja 0.500 org/hr
Mandor 0.050 org/hr

A.2.3.1.10 1 m³ Memadatkan Tanah Per 20 cm

11 A.2.3.1.11 1 m³ Pengurugan dengan pasir urug

Bahan
Pasir urug 1.200 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Mandor 0.010 org/hr

A.2.3.1.11 1 m³ Pengurugan dengan pasir urug

12 A.2.3.1.12 1 m³ Pasang Lapisan Pudel Campuran 1 KP : 3 PP : 7 TL

Bahan
A.2.3.1 Als-Pek.Tanah / HAL 92 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN PEKERJAAN KOEF SATUAN
ANALISA
1 2 3 4

Kapur Padam 0.135 m³


Pasir pasang 0.400 m³
Tanah liat 0.946 m³
Tenaga Kerja
Pekerja 0.800 org/hr
Tukang Batu 0.400 org/hr
Kepala Tukang 0.040 org/hr
Mandor 0.080 org/hr

A.2.3.1.12 1 m³ Pasang Lapisan Pudel Campuran 1 KP : 3 PP : 7 TL

A.2.3.1 Als-Pek.Tanah / HAL 93 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN PEKERJAAN KOEF SATUAN
ANALISA
1 2 3 4

13 A.2.3.1.13 1 m³ Pasang Lapisan Pudel Campuran 1 KP : 5 TL

Bahan
Kapur Padam 0.248 m³
Pasir pasang 0.400 m³
Tanah liat 1.240 m³
Tenaga Kerja
Pekerja 0.800 org/hr
Tukang Gali 0.400 org/hr
Kepala Tukang 0.040 org/hr
Mandor 0.080 org/hr

A.2.3.1.13 1 m³ Pasang Lapisan Pudel Campuran 1 KP : 5 TL

14 A.2.3.1.14 1 m³ Lapisan Ijuk Tebal 10 cm, untuk bidang resapan

Bahan
Ijuk 6.000 kg
Tenaga Kerja
Pekerja 0.150 org/hr
Mandor 0.015 org/hr

A.2.3.1.14 1 m³ Lapisan Ijuk Tebal 10 cm, untuk bidang resapan

15 A.2.3.1.15 1 m³ Urug Sirtu Padat Untuk Peniggian Lantai Bangunan

Bahan
Sirtu 1.20 m³

Pekerja 0.250 org/hr


Mandor 0.025 org/hr

A.2.3.1.15 1 m³ Urug Sirtu Padat Untuk Peniggian Lantai Bangunan

16 A.2.3.1.16 1m3 Buangan tanah kearea site dengan jarak 100 m


SNI-2836-2008
Pekerja 0.600 org
Mandor 0.030 org

A.2.3.1.16 1m3 Buangan tanah kearea site dengan jarak 100 m

17 A.2.3.1.17 1 m3 Galian tanah sumuran rata-rata ( Manual )


SNI-2836-2008
Pekerja 1.100 org
Mandor 0.066 org

A.2.3.1 Als-Pek.Tanah / HAL 94 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN PEKERJAAN KOEF SATUAN
ANALISA
1 2 3 4

A.2.3.1.17 1 m3 Galian tanah sumuran rata-rata ( Manual )

A.2.3.1 Als-Pek.Tanah / HAL 95 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN PEKERJAAN KOEF SATUAN
ANALISA
1 2 3 4

A.1 A.2.3.1a HARGA SATUAN PEKERJAAN TANAH


NON STANDAR
1 A.2.3.1a.1 1 Btg Cerucuk Kayu Ø 8-10 Cm Panjang 4 m'

Bahan
Cerucuk Ø 8-10 Cm Panjang 4m' 1.000 Bh
Papan Kepala Tiang kayu Kamper Medan 0.002 m³
Paku 0.100 Kg
Alat
Excavator 0.010 Jam
Tenaga Kerja
Pekerja 0.050 org/hr
Mandor 0.010 org/hr

A.2.3.1a.1 1 Btg Cerucuk Kayu Ø 8-10 Cm Panjang 4 m'

2 A.2.3.1a.2 1 m2 Penyemprotan anti rayap untuk pondasi

Bahan
Anti rayap 1.000 m2
Tenaga Kerja
Pekerja 0.107 hari
Mandor 0.018 hari

A.2.3.1a.2 1 m2 Penyemprotan anti rayap untuk pondasi

3 A.2.3.1a.3 1 m2 Styrofoam untuk peredam getaran mesin

Bahan
Styrofoam t = 2.6 cm 0.030 m3
Tenaga Kerja
Tukang 0.026 hari
Pekerja 0.052 hari
Mandor 0.005 hari

A.2.3.1a.3 1 m2 Styrofoam untuk peredam getaran mesin

4 A.2.3.1a.4 1 m³ Pekerjaan Soil Cement Tanah Laterit`(Clean Set)


Bahan
Tanah Laterit 1.4000 M³
Semen 1.7000 Zak
Alat
Vibro Roller 0.0800 Jam
Whell Loader 0.0800 Jam
Tenaga Kerja
Pekerja 0.0300 org/hr
Mandor 0.0100 org/hr

A.2.3.1 Als-Pek.Tanah / HAL 96 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN PEKERJAAN KOEF SATUAN
ANALISA
1 2 3 4

A.2.3.1a.4 1 m³ Pekerjaan Soil Cement Tanah Laterit`(Clean Set)

5 A.2.3.1a.5 1 m2 Pemasangan 1 m² Lapisan Geotekstil non waven tebal 5 mm untuk bidang resa
Bahan
Lapisan Geotextile 1.1000 M²
Alat Bantu 1.0000 Ls
Tenaga Kerja
Pekerja 0.0400 org/hr
Mandor 0.0050 org/hr

A.2.3.1a.5 1 m2 Pemasangan 1 m² Lapisan Geotekstil non waven tebal 5 mm untuk bidang resa

A.2.3.1 Als-Pek.Tanah / HAL 97 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

Rp 89,320.00 Rp 66,990.00
Rp 157,850.00 Rp 3,946.25
Jumlah : Rp 70,936.25
Overhead & keuntungan 10% : Rp 7,093.63
Jumlah : Rp 78,029.88
Dibulatkan : Rp 78,030.00

Rp 89,320.00 Rp 80,388.00
Rp 157,850.00 Rp 7,103.25
Jumlah : Rp 87,491.25
Overhead & keuntungan 10% : Rp 8,749.13
Jumlah : Rp 96,240.38
Dibulatkan : Rp 96,200.00

Rp 89,320.00 Rp 93,786.00
Rp 157,850.00 Rp 10,575.95
Jumlah : Rp 104,361.95
Overhead & keuntungan 10% : Rp 10,436.20
Jumlah : Rp 114,798.15
Dibulatkan : Rp 114,800.00

Rp 89,320.00 Rp 89,320.00
Rp 157,850.00 Rp 5,051.20
Jumlah : Rp 94,371.20
Overhead & keuntungan 10% : Rp 9,437.12
Jumlah : Rp 103,808.32
Dibulatkan : Rp 103,800.00

Rp 89,320.00 Rp 133,980.00
Rp 157,850.00 Rp 9,471.00
Jumlah : Rp 143,451.00
Overhead & keuntungan 10% : Rp 14,345.10
Jumlah : Rp 157,796.10
Dibulatkan : Rp 157,800.00

A.2.3.1 Als-Pek.Tanah / HAL 98 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

Rp 89,320.00 Rp 107,184.00
Rp 157,850.00 Rp 7,103.25
Jumlah : Rp 114,287.25
Overhead & keuntungan 10% : Rp 11,428.73
Jumlah : Rp 125,715.98
Dibulatkan : Rp 125,700.00

A.2.3.1 Als-Pek.Tanah / HAL 99 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

Rp 89,320.00 Rp 4,466.00
Rp 157,850.00 Rp 789.25
Jumlah : Rp 5,255.25
Overhead & keuntungan 10% : Rp 525.53
Jumlah : Rp 5,780.78
Dibulatkan : Rp 5,800.00

Rp 89,320.00 Rp 29,475.60
Rp 157,850.00 Rp 1,578.50
Jumlah : Rp 31,054.10
Overhead & keuntungan 10% : Rp 3,105.41
Jumlah : Rp 34,159.51
Dibulatkan : Rp 34,200.00

Rp 89,320.00 Rp 44,660.00
Rp 157,850.00 Rp 7,892.50
Jumlah : Rp 52,552.50
Overhead & keuntungan 10% : Rp 5,255.25
Jumlah : Rp 57,807.75
Dibulatkan : Rp 57,800.00

Rp 89,320.00 Rp 44,660.00
Rp 157,850.00 Rp 7,892.50
Jumlah : Rp 52,552.50
Overhead & keuntungan 10% : Rp 5,255.25
Jumlah : Rp 57,807.75
Dibulatkan : Rp 57,800.00

Rp 145,728.00
Rp 121,440.00 Rp 145,728.00
Rp 28,374.50
Rp 89,320.00 Rp 26,796.00
Rp 157,850.00 Rp 1,578.50
Jumlah : Rp 174,102.50
Overhead & keuntungan 10% : Rp 17,410.25
Jumlah : Rp 191,512.75
Dibulatkan : Rp 191,500.00

Rp 160,040.00
A.2.3.1 Als-Pek.Tanah / HAL 100 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

Rp 70,000.00 Rp 9,450.00
Rp 175,450.00 Rp 70,180.00
Rp 85,000.00 Rp 80,410.00
Rp 145,376.00
Rp 89,320.00 Rp 71,456.00
Rp 137,445.00 Rp 54,978.00
Rp 157,850.00 Rp 6,314.00
Rp 157,850.00 Rp 12,628.00
Jumlah : Rp 305,416.00
Overhead & keuntungan 10% : Rp 30,541.60
Jumlah : Rp 335,957.60
Dibulatkan : Rp 336,000.00

A.2.3.1 Als-Pek.Tanah / HAL 101 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

Rp 161,940.00
Rp 70,000.00 Rp 17,360.00
Rp 175,450.00 Rp 70,180.00
Rp 60,000.00 Rp 74,400.00
Rp 145,376.00
Rp 89,320.00 Rp 71,456.00
Rp 137,445.00 Rp 54,978.00
Rp 157,850.00 Rp 6,314.00
Rp 157,850.00 Rp 12,628.00
Jumlah : Rp 307,316.00
Overhead & keuntungan 10% : Rp 30,731.60
Jumlah : Rp 338,047.60
Dibulatkan : Rp 338,000.00

Rp 154,761.42
Rp 25,793.57 Rp 154,761.42
Rp 15,765.75
Rp 89,320.00 Rp 13,398.00
Rp 157,850.00 Rp 2,367.75
Jumlah : Rp 170,527.17
Overhead & keuntungan 10% : Rp 17,052.72
Jumlah : Rp 187,579.89
Dibulatkan : Rp 187,600.00

Rp 182,160.00
Rp 151,800.00 Rp 182,160.00
Rp 26,276.25
Rp 89,320.00 Rp 22,330.00
Rp 157,850.00 Rp 3,946.25
Jumlah : Rp 208,436.25
Overhead & keuntungan 10% : Rp 20,843.63
Jumlah : Rp 229,279.88
Dibulatkan : Rp 229,300.00

Rp 89,320.00 Rp 53,592.00
Rp 157,850.00 Rp 4,735.50
Jumlah : Rp 58,327.50
Overhead & keuntungan 10% : Rp 5,832.75
Jumlah : Rp 64,160.25
Dibulatkan : Rp 64,200.00

Rp 89,320.00 Rp 98,252.00
Rp 157,850.00 Rp 10,418.10
Jumlah : Rp 108,670.10
A.2.3.1 Als-Pek.Tanah / HAL 102 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

Overhead & keuntungan 10% : Rp 10,867.01


Jumlah : Rp 119,537.11
Dibulatkan : Rp 119,500.00

A.2.3.1 Als-Pek.Tanah / HAL 103 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

Rp 39,347.00
Rp 37,510.00 Rp 37,510.00
Rp - Rp -
Rp 18,370.00 Rp 1,837.00
Rp 6,249.77
Rp 624,977.30 Rp 6,249.77
Rp 6,044.50
Rp 89,320.00 Rp 4,466.00
Rp 157,850.00 Rp 1,578.50
Jumlah : Rp 51,641.27
Overhead & keuntungan 10% : Rp 5,164.13
Jumlah : Rp 56,805.40
Dibulatkan : Rp 56,800.00

Rp 17,500.00
Rp 17,500.00 Rp 17,500.00
Rp 12,333.69
Rp 89,320.00 Rp 9,527.47
Rp 157,850.00 Rp 2,806.22
Jumlah : Rp 29,833.69
Overhead & keuntungan 10% : Rp 2,983.37
Jumlah : Rp 32,817.06
Dibulatkan : Rp 32,800.00

Rp 11,875.80
Rp 393,760.00 Rp 11,875.80
Rp 9,039.03
137,445.00 Rp 3,573.57
Rp 89,320.00 Rp 4,644.64
Rp 157,850.00 Rp 820.82
Jumlah : Rp 20,914.83
Overhead & keuntungan 10% : Rp 2,091.48
Jumlah : Rp 23,006.31
Dibulatkan : Rp 23,000.00

Rp 287,387.00
Rp 125,000.00 Rp 175,000.00
Rp 66,110.00 Rp 112,387.00
Rp 69,747.94
Rp 404,666.92 Rp 32,373.35
Rp 467,182.34 Rp 37,374.59
Rp 4,258.10
Rp 89,320.00 Rp 2,679.60
Rp 157,850.00 Rp 1,578.50
Jumlah : Rp 361,393.04
Overhead & keuntungan 10% : Rp 36,139.30
A.2.3.1 Als-Pek.Tanah / HAL 104 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH

5 6 7

Jumlah : Rp 397,532.34
Dibulatkan : Rp 397,500.00

stil non waven tebal 5 mm untuk bidang resapan


Rp 27,225.00
Rp 22,500.00 Rp 24,750.00
Rp 2,475.00 Rp 2,475.00
Rp 4,362.05
Rp 89,320.00 Rp 3,572.80
Rp 157,850.00 Rp 789.25
Jumlah : Rp 31,587.05
Overhead & keuntungan 10% : Rp 3,158.71
Jumlah : Rp 34,745.76
stil non waven tebal 5 mm untuk bidang resapan Dibulatkan : Rp 34,700.00

A.2.3.1 Als-Pek.Tanah / HAL 105 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5

F PEKERJAAN TANAH DENGAN ALAT BERAT


DIRJEN Binamarga-PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan

1 F.1 1 m³ Galian Tanah biasa


Bahan / alat
Excavator 0.0256 jam
Dump Truck 8 ton 0.0392 jam
Tenaga Kerja
Pekerja 0.1071 jam
Mandor 0.0535 jam

F.1 1 m³ Galian Tanah biasa

2 F.2 1 m³ Galian batu


Bahan / alat
Compresor 0.0738 jam
Jack Hammer 0.0738 jam
Wheel loader 0.0738 jam
Excavator 0.0738 jam
Dump Truck 8 ton 0.0738 jam
Tenaga Kerja
Pekerja 0.5902 jam
Mandor 0.0738 jam

F.2 1 m³ Galian batu

3 F.3 1 m³ Galian Struktur dengan kedalaman 0-2m


Bahan / alat
Excavator 0.0272 jam
Sewa dump truck 0.0783 jam
Tenaga Kerja
Pekerja 0.1633 jam
Mandor 0.0163 jam

F.3 1 m³ Galian Struktur dengan kedalaman 0-2m

4 F.4 1 m³ Galian Struktur dengan kedalaman 2-4m


Bahan / alat
Excavator 0.0283 jam
Sewa dump truck 0.0783 jam
Tenaga Kerja
Pekerja 0.1633 jam
Mandor 0.0163 jam

F.4 1 m³ Galian Struktur dengan kedalaman 2-4m

5 F.4.a 1 m³ Galian Struktur dengan kedalaman >4 m


Bahan / alat
Excavator 0.0393 jam
F Pek.Tanah (dg alat berat) / HAL 106 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Sewa dump truck 0.0783 jam
Tenaga Kerja
Pekerja 0.1633 jam
Mandor 0.0163 jam

F.4.a 1 m³ Galian Struktur dengan kedalaman >4 m

6 TM.04.C 1 m³ Pemadatan tanah di lokasi pekerjaan (tanah menggunakan hasil galian setempat)
Alat berat ( Termasuk Operator )
Bulldozer 0.0200 jam
Vibrator roller 6-8 ton 0.0178 jam
Water Tanker 0.0078 jam
Tenaga Kerja
Pekerja 0.1422 jam
Mandor 0.0142 jam

TM.04.C 1 m³ Pemadatan tanah di lokasi pekerjaan (tanah menggunakan hasil galian setempat)
7 F.5a 1 m³ Timbunan tanah berikut Pemadatan tanah tiap 20 cm (Tanah dari luar)

Bahan + alat berat


Tanah urug pilihan 1.2000 m³
Excavator 0.0101 jam
Dump Truck 8 ton 0.6103 jam
Motor grader 0.0037 jam
Vibrator roller 6-8 ton 0.0042 jam
Water Tanker 0.0070 jam
Tenaga Kerja
Pekerja 0.1963 jam
Mandor 0.0178 jam

F.5a 1 m³ Timbunan tanah berikut Pemadatan tanah tiap 20 cm (Tanah dari luar)

F Pek.Tanah (dg alat berat) / HAL 107 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
8 F.5b 1 m³ Urugan Sirtu + pemadatan dengan alat berat
Bahan
Sirtu 1.2000 m³
Wheel Loader 0.0101 jam
Dump Truck 8 ton 0.6103 jam
Motor grader 0.0037 jam
Tandem roller 0.0042 jam
Water Tanker 0.0070 jam
Tenaga Kerja
Pekerja 0.1963 jam
Mandor 0.0178 jam

F.5b 1 m³ Urugan Sirtu + pemadatan dengan alat berat

9 F.5c 1 m³ Buangan tanah keluar site


Bahan / alat
Excavator 0.0535 jam
Dumptruck 8 ton 0.0975 jam
Tenaga Kerja
Pekerja 0.1071 jam
Mandor 0.0535 jam

F.5c 1 m³ Buangan tanah keluar site

10 F.5d 1 m³ Pemadatan sampai dengan CBR 5%


Bahan / alat
Motor grader 0.0037 jam
Vibrator roller 6-8 ton 0.0042 jam
Water Tanker 0.0070 jam
Tenaga Kerja
Pekerja 0.1963 jam
Mandor 0.1963 jam

F.5d 1 m³ Pemadatan sampai dengan CBR 5%

11 F.5e 1 m1 Pengeboran tanah Ø 20cm ( Pakai mesin )


Bahan / alat
Mesin pengeboran 0.5120 jam
Tenaga Kerja
Pekerja 0.4284 jam
Mandor 0.2140 jam

F.5e 1 m1 Pengeboran tanah Ø 20cm ( Pakai mesin )

12 F.5e 1 m1 Pengeboran tanah Ø 30cm ( Pakai mesin )


Bahan / alat
Mesin pengeboran 0.5120 jam
Tenaga Kerja
Pekerja 0.5355 jam

F Pek.Tanah (dg alat berat) / HAL 108 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Mandor 0.2675 jam

F.5e 1 m1 Pengeboran tanah Ø 30cm ( Pakai mesin )

13 F.5f 1 m1 Pengeboran tanah Ø 40cm ( Pakai mesin )


Bahan / alat
Mesin pengeboran 0.5120 jam
Tenaga Kerja
Pekerja 0.5623 jam
Mandor 0.2809 jam

F.5f 1 m1 Pengeboran tanah Ø 40cm ( Pakai mesin )

14 F.5g 1 m1 Pengeboran tanah Ø 50cm ( Pakai mesin )


Bahan / alat
Mesin pengeboran 0.5120 jam
Tenaga Kerja
Pekerja 0.5904 jam
Mandor 0.2949 jam

F.5g 1 m1 Pengeboran tanah Ø 50cm ( Pakai mesin )

F Pek.Tanah (dg alat berat) / HAL 109 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
15 F.5h 1 m1 Pengeboran tanah Ø 60cm ( Pakai mesin )
Bahan / alat
Mesin pengeboran 0.5123 jam
Temporary casing 1.0000 m'
Tenaga Kerja
Pekerja 0.6199 jam
Mandor 0.3097 jam
Mobilisasi alat Mesin pengeboran 1.0000 LS

F.5h 1 m1 Pengeboran tanah Ø 60cm ( Pakai mesin )

16 F.5I 1 m1 Pengeboran tanah Ø80cm ( Pakai mesin )


Bahan / alat
Mesin pengeboran 0.6147 jam
Temporary casing 1.0000 m'
Tenaga Kerja
Pekerja 0.6509 jam
Mandor 0.3251 jam
Mobilisasi alat Mesin pengeboran 1.0000 LS

F.5I 1 m1 Pengeboran tanah Ø80cm ( Pakai mesin )

17 F.5j 1 m1 Pengeboran tanah Ø100cm ( Pakai mesin )


Bahan / alat
Mesin pengeboran 0.6403 jam
Temporary casing 1.0000 m'
Tenaga Kerja
Pekerja 0.6834 jam
Mandor 0.3414 jam
Mobilisasi alat Mesin pengeboran 1.0000 LS

F.5j 1 m1 Pengeboran tanah Ø100cm ( Pakai mesin )

F.5e 1 m1 Pengeboran tanah Ø 20cm ( Pakai mesin )


Bahan / alat
Mesin pengeboran 0.5120 jam
Tenaga Kerja
Pekerja 0.5355 jam
Mandor 0.2140 jam

F.5e 1 m1 Pengeboran tanah Ø 20cm ( Pakai mesin )

F.5b 1 m³ Urugan Gravel


Bahan

F Pek.Tanah (dg alat berat) / HAL 110 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Batu Split 2x3 1.2000 m³
Tenaga Kerja
Pekerja 0.1963 jam
Mandor 0.0178 jam

F.5b 1 m³ Urugan Gravel

F Pek.Tanah (dg alat berat) / HAL 111 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

6 7 8

Rp 19,606.91
Rp 321,200.00 Rp 8,222.72
Rp 290,783.82 Rp 11,384.19
Rp 3,602.23
Rp 17,864.00 Rp 1,913.23
Rp 31,570.00 Rp 1,689.00
Jumlah : Rp 23,209.14
Overhead & keuntungan 10% : Rp 2,320.91
Jumlah : Rp 25,530.05
Dibulatkan : Rp 25,530.00

Rp 93,622.80
Rp 173,435.48 Rp 12,799.54
Rp 16,000.00 Rp 1,180.80
Rp 467,182.34 Rp 34,478.06
Rp 321,200.00 Rp 23,704.56
Rp 290,783.82 Rp 21,459.85
Rp 12,873.20
Rp 17,864.00 Rp 10,543.33
Rp 31,570.00 Rp 2,329.87
Jumlah : Rp 106,496.00
Overhead & keuntungan 10% : Rp 10,649.60
Jumlah : Rp 117,145.60
Dibulatkan : Rp 117,100.00

Rp 31,505.01
Rp 321,200.00 Rp 8,736.64
Rp 290,783.82 Rp 22,768.37
Rp 3,431.78
Rp 17,864.00 Rp 2,917.19
Rp 31,570.00 Rp 514.59
Jumlah : Rp 34,936.80
Overhead & keuntungan 10% : Rp 3,493.68
Jumlah : Rp 38,430.47
Dibulatkan : Rp 38,400.00

Rp 31,858.33
Rp 321,200.00 Rp 9,089.96
Rp 290,783.82 Rp 22,768.37
Rp 3,431.78
Rp 17,864.00 Rp 2,917.19
Rp 31,570.00 Rp 514.59
Jumlah : Rp 35,290.12
Overhead & keuntungan 10% : Rp 3,529.01
Jumlah : Rp 38,819.13
Dibulatkan : Rp 38,800.00

Rp 35,391.53
Rp 321,200.00 Rp 12,623.16
F Pek.Tanah (dg alat berat) / HAL 112 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH

6 7 8
Rp 290,783.82 Rp 22,768.37
Rp 3,431.78
Rp 17,864.00 Rp 2,917.19
Rp 31,570.00 Rp 514.59
Jumlah : Rp 38,823.32
Overhead & keuntungan 10% : Rp 3,882.33
Jumlah : Rp 42,705.65
Dibulatkan : Rp 42,700.00

menggunakan hasil galian setempat)


Rp 21,974.35
Rp 651,433.52 Rp 13,028.67
Rp 404,666.92 Rp 7,203.07
Rp 223,411.65 Rp 1,742.61
Rp 2,988.55
Rp 17,864.00 Rp 2,540.26
Rp 31,570.00 Rp 448.29
Jumlah : Rp 24,962.91
Overhead & keuntungan 10% : Rp 2,496.29
Jumlah : Rp 27,459.20
menggunakan hasil galian setempat) Dibulatkan : Rp 27,500.00

Rp 326,288.17
Rp 116,800.20 Rp 140,160.24
Rp 321,200.00 Rp 3,244.12
Rp 290,783.82 Rp 177,465.37
Rp 582,421.73 Rp 2,154.96
Rp 404,666.92 Rp 1,699.60
Rp 223,411.65 Rp 1,563.88
Rp 4,068.65
Rp 17,864.00 Rp 3,506.70
Rp 31,570.00 Rp 561.95
Jumlah : Rp 330,356.82
Overhead & keuntungan 10% : Rp 33,035.68
Jumlah : Rp 363,392.50
Dibulatkan : Rp 363,400.00

F Pek.Tanah (dg alat berat) / HAL 113 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

6 7 8

Rp 369,762.35
Rp 151,800.00 Rp 182,160.00
Rp 467,182.34 Rp 4,718.54
Rp 290,783.82 Rp 177,465.37
Rp 582,421.73 Rp 2,154.96
Rp 404,666.92 Rp 1,699.60
Rp 223,411.65 Rp 1,563.88
Rp 4,068.65
Rp 17,864.00 Rp 3,506.70
Rp 31,570.00 Rp 561.95
Jumlah : Rp 373,831.00
Overhead & keuntungan 10% : Rp 37,383.10
Jumlah : Rp 411,214.10
Dibulatkan : Rp 411,214.00

Rp 45,535.62
Rp 321,200.00 Rp 17,184.20
Rp 290,783.82 Rp 28,351.42
Rp 3,602.23
Rp 17,864.00 Rp 1,913.23
Rp 31,570.00 Rp 1,689.00
Jumlah : Rp 49,137.85
Overhead & keuntungan 10% : Rp 4,913.79
Jumlah : Rp 54,051.64
Dibulatkan : Rp 54,100.00

Rp 5,418.44
Rp 582,421.73 Rp 2,154.96
Rp 404,666.92 Rp 1,699.60
Rp 223,411.65 Rp 1,563.88
Rp 9,703.89
Rp 17,864.00 Rp 3,506.70
Rp 31,570.00 Rp 6,197.19
Jumlah : Rp 15,122.34
Overhead & keuntungan 10% : Rp 1,512.23
Jumlah : Rp 16,634.57
Dibulatkan : Rp 16,630.00

Rp 405,422.06
Rp 791,839.97 Rp 405,422.06
Rp 14,408.92
Rp 17,864.00 Rp 7,652.94
Rp 31,570.00 Rp 6,755.98
Jumlah : Rp 419,830.98
Overhead & keuntungan 10% : Rp 41,983.10
Jumlah : Rp 461,814.08
Dibulatkan : Rp 461,800.00

Rp 405,422.06
Rp 791,839.97 Rp 405,422.06
Rp 18,011.15
Rp 17,864.00 Rp 9,566.17

F Pek.Tanah (dg alat berat) / HAL 114 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

6 7 8
Rp 31,570.00 Rp 8,444.98
Jumlah : Rp 423,433.21
Overhead & keuntungan 10% : Rp 42,343.32
Jumlah : Rp 465,776.53
Dibulatkan : Rp 465,800.00

Rp 405,422.06
Rp 791,839.97 Rp 405,422.06
Rp 18,911.70
Rp 17,864.00 Rp 10,044.48
Rp 31,570.00 Rp 8,867.22
Jumlah : Rp 424,333.77
Overhead & keuntungan 10% : Rp 42,433.38
Jumlah : Rp 466,767.15
Dibulatkan : Rp 466,800.00

Rp 405,422.06
Rp 791,839.97 Rp 405,422.06
Rp 19,857.29
Rp 17,864.00 Rp 10,546.70
Rp 31,570.00 Rp 9,310.58
Jumlah : Rp 425,279.35
Overhead & keuntungan 10% : Rp 42,527.94
Jumlah : Rp 467,807.29
Dibulatkan : Rp 467,800.00

F Pek.Tanah (dg alat berat) / HAL 115 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

6 7 8

Rp 480,620.02
Rp 791,839.97 Rp 405,620.02
Rp 75,000.00 Rp 75,000.00
Rp 20,850.15
Rp 17,864.00 Rp 11,074.04
Rp 31,570.00 Rp 9,776.11
Rp 12,015.50 Rp 12,015.50 Rp 12,015.50
Jumlah : Rp 513,485.68
Overhead & keuntungan 10% : Rp 51,348.57
Jumlah : Rp 564,834.25
Dibulatkan : Rp 564,800.00

Rp 561,744.03
Rp 791,839.97 Rp 486,744.03
Rp 75,000.00 Rp 75,000.00
Rp 21,892.66
Rp 17,864.00 Rp 11,627.74
Rp 31,570.00 Rp 10,264.92
Rp 14,043.60 Rp 14,043.60 Rp 14,043.60
Jumlah : Rp 597,680.29
Overhead & keuntungan 10% : Rp 59,768.03
Jumlah : Rp 657,448.32
Dibulatkan : Rp 657,400.00

Rp 582,025.03
Rp 791,839.97 Rp 507,025.03
Rp 75,000.00 Rp 75,000.00
Rp 22,987.29
Rp 17,864.00 Rp 12,209.13
Rp 31,570.00 Rp 10,778.17
Rp 14,550.63 Rp 14,550.63 Rp 14,550.63
Jumlah : Rp 619,562.95
Overhead & keuntungan 10% : Rp 61,956.30
Jumlah : Rp 681,519.25
Dibulatkan : Rp 681,500.00

Rp 405,422.06
Rp 791,839.97 Rp 405,422.06
Rp 16,322.15
Rp 17,864.00 Rp 9,566.17
Rp 31,570.00 Rp 6,755.98
Jumlah : Rp 421,744.22
Overhead & keuntungan 10% : Rp 42,174.42
Jumlah : Rp 463,918.64
Dibulatkan : Rp 463,900.00

Rp 278,256.00

F Pek.Tanah (dg alat berat) / HAL 116 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

6 7 8
Rp 231,880.00 Rp 278,256.00
Rp 4,068.65
Rp 17,864.00 Rp 3,506.70
Rp 31,570.00 Rp 561.95
Jumlah : Rp 282,324.65
Overhead & keuntungan 10% : Rp 28,232.46
Jumlah : Rp 310,557.11
Dibulatkan : Rp 310,557.00

F Pek.Tanah (dg alat berat) / HAL 117 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 2 3
A.3.2.1 PEKERJAAN PONDASI
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
1 1 m³ Pasang Pondasi Batu Belah 1 : 3
Bahan
Batu Belah 15 cm / 20 cm 1.2000 m³
PC/Semen 202.0000 Kg
Pasir pasang 0.4850 m³
Tenaga Kerja
Pekerja 1.5000 org/hr
Tukang Batu 0.7500 org/hr
Kepala Tukang 0.0750 org/hr
Mandor 0.0750 org/hr

1 1 m³ Pasang Pondasi Batu Belah 1 : 3


2 1 m³ Pasang Pondasi Batu Belah 1 : 4
Bahan
Batu Belah 15 cm / 20 cm 1.2000 m³
PC/Semen 163.0000 Kg
Pasir pasang 0.5200 m³
Tenaga Kerja
Pekerja 1.5000 org/hr
Tukang Batu 0.7500 org/hr
Kepala Tukang 0.0750 org/hr
Mandor 0.0750 org/hr

2 1 m³ Pasang Pondasi Batu Belah 1 : 4


3 1 m³ Pasang Pondasi Batu Belah 1 : 5
Bahan
Batu Belah 15 cm / 20 cm 1.2000 m³
PC/Semen 136.0000 Kg
Pasir pasang 0.5440 m³
Tenaga Kerja
Pekerja 1.5000 org/hr
Tukang Batu 0.7500 org/hr
Kepala Tukang 0.0750 org/hr
Mandor 0.0750 org/hr

3 1 m³ Pasang Pondasi Batu Belah 1 : 5


4 1 m³ Pasang Pondasi Batu Belah 1 : 6
Bahan
Batu Belah 15 cm / 20 cm 1.2000 m³
PC/Semen 117.0000 Kg
Pasir pasang 0.5610 m³
Tenaga Kerja
Pekerja 1.5000 org/hr
Tukang Batu 0.7500 org/hr
Kepala Tukang 0.0750 org/hr
Mandor 0.0750 org/hr

4 1 m³ Pasang Pondasi Batu Belah 1 : 6


A.3.2.1.Pek.Pondasi / HAL 118 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 2 3
5 1 m³ Pasang Pondasi Batu Belah 1 : 8
Bahan
Batu Belah 15 cm / 20 cm 1.2000 m³
PC/Semen 91.0000 Kg
Pasir pasang 0.5840 m³
Tenaga Kerja
Pekerja 1.5000 org/hr
Tukang Batu 0.7500 org/hr
Kepala Tukang 0.0750 org/hr
Mandor 0.0750 org/hr

5 1 m³ Pasang Pondasi Batu Belah 1 : 8

A.3.2.1.Pek.Pondasi / HAL 119 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 2 3
6 6 1 m³ Pasang Pondasi Batu Belah 1 KP : 1PC : 2 PP
7 7 1 m³ Pasang Pondasi Batu Belah 1 PC : 3KP : 10 PP
8 8 1 m³ Pasang Pondasi Batu Belah 1/4 PC : 1KP : 4 PP

9 1 m³ Pasang Batu Kosong ( Aanstamping )


Bahan
Batu Belah 15 cm / 20 cm 1.2000 m³
Pasir urug 0.4320 m³
Tenaga Kerja
Pekerja 0.7800 org/hr
Tukang Batu 0.3900 org/hr
Kepala Tukang 0.0390 org/hr
Mandor 0.0390 org/hr

9 1 m³ Pasang Batu Kosong ( Aanstamping )

10 1 m³ Pasang Bronjong Kawat Batu Kali


Bahan
Batu Belah 15 cm / 20 cm 1.2000 m³
Kawat bronjong 11.0000 m2
Tenaga Kerja
Pekerja 0.7800 org/hr
Tukang Batu 0.3900 org/hr
Kepala Tukang 0.0390 org/hr
Mandor 0.0390 org/hr

10 1 m³ Pasang Bronjong Kawat Batu Kali


11 1 m³ Pasang Pondasi Siklop. 60 % Beton Campuran 1 : 2 : 3
Bahan
Batu Belah 15 cm / 20 cm 0.4800 m³
PC/Semen 194.0000 Kg
Pasir Beton 0.3120 m³
Batu pecah uk. 2x3cm 0.4680 m³
Besi Beton 126.0000 Kg
Kawat Beton 1.8000 Kg
Tenaga Kerja
Pekerja 3.4000 org/hr
Tukang Batu 0.8500 org/hr
Kepala Tukang 0.0850 org/hr
Mandor 0.1700 org/hr

11 1 m³ Pasang Pondasi Siklop. 60 % Beton Campuran 1 : 2 : 3


12 1 m³ Pasang Pondasi Sumuran. Dia 100 cm
Bahan
Batu Belah 15 cm / 20 cm 0.4500 m³
PC/Semen 194.0000 Kg
Pasir beton 0.3120 m³
Batu pecah uk. 2x3cm 0.4680 m³
Tenaga Kerja
Pekerja 2.4000 org/hr
Tukang Batu 0.8000 org/hr
Kepala Tukang 0.0800 org/hr
A.3.2.1.Pek.Pondasi / HAL 120 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 2 3
Mandor 0.1190 org/hr

12 1 m³ Pasang Pondasi Sumuran. Dia 100 cm


13 1 m³ Pasangan Pondasi Rollag Bata 1:4
Bahan
Batu Bata Merah 475.0000 bh
Semen 96.0000 kg
Pasir Pasang 0.4160 m³
Tenaga Kerja Kepala Tukang
Tukang Batu 1.5000 org/hr
0.1500 org/hr
Pekerja 3.0000 org/hr
Mandor 0.0150 org/hr

13 1 m³ Pasangan Pondasi Rollag Bata 1:4

A.3.2.1.Pek.Pondasi / HAL 121 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
4 5 6

665,545.65
261,140.00 313,368.00
1,322.20 267,084.40
175,450.00 85,093.25

89,320.00 133,980.00 260,741.25


137,445.00 103,083.75
157,850.00 11,838.75
157,850.00 11,838.75
Jumlah : 926,286.90
Overhead & keuntungan 10% : 92,628.69
Jumlah : 1,018,915.59
Dibulatkan : 1,018,900.00

620,120.60
261,140.00 313,368.00
1,322.20 215,518.60
175,450.00 91,234.00

89,320.00 133,980.00 260,741.25


137,445.00 103,083.75
157,850.00 11,838.75
157,850.00 11,838.75
Jumlah : 880,861.85
Overhead & keuntungan 10% : 88,086.19
Jumlah : 968,948.04
Dibulatkan : 968,900.00

588,632.00
261,140.00 313,368.00
1,322.20 179,819.20
175,450.00 95,444.80

89,320.00 133,980.00 260,741.25


137,445.00 103,083.75
157,850.00 11,838.75
157,850.00 11,838.75
Jumlah : 849,373.25
Overhead & keuntungan 10% : 84,937.33
Jumlah : 934,310.58
Dibulatkan : 934,300.00

566,492.85
261,140.00 313,368.00
1,322.20 154,697.40
175,450.00 98,427.45

89,320.00 133,980.00 260,741.25


137,445.00 103,083.75
157,850.00 11,838.75
157,850.00 11,838.75
Jumlah : 827,234.10
Overhead & keuntungan 10% : 82,723.41
Jumlah : 909,957.51
Dibulatkan : 910,000.00
A.3.2.1.Pek.Pondasi / HAL 122 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
4 5 6

536,151.00
261,140.00 313,368.00
1,322.20 120,320.20
175,450.00 102,462.80

89,320.00 133,980.00 260,741.25


137,445.00 103,083.75
157,850.00 11,838.75
157,850.00 11,838.75
Jumlah : 796,892.25
Overhead & keuntungan 10% : 79,689.23
Jumlah : 876,581.48
Dibulatkan : 876,600.00

A.3.2.1.Pek.Pondasi / HAL 123 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
4 5 6
- - -
- - -
- - -

365,830.08
261,140.00 313,368.00
121,440.00 52,462.08
135,585.45
89,320.00 69,669.60
137,445.00 53,603.55
157,850.00 6,156.15
157,850.00 6,156.15
Jumlah : 501,415.53
Overhead & keuntungan 10% : 50,141.55
Jumlah : 551,557.08
Dibulatkan : 551,600.00

610,368.00
261,140.00 313,368.00
27,000.00 297,000.00
135,585.45
89,320.00 69,669.60
137,445.00 53,603.55
157,850.00 6,156.15
157,850.00 6,156.15
Jumlah : 745,953.45
Overhead & keuntungan 10% : 74,595.35
Jumlah : 820,548.80
Dibulatkan : 820,500.00

1,978,436.24
261,140.00 125,347.20
1,322.20 256,506.80
175,450.00 54,740.40
231,880.00 108,519.84
11,110.00 1,399,860.00
18,590.00 33,462.00
460,768.00
89,320.00 303,688.00
137,445.00 116,828.25
157,850.00 13,417.25
157,850.00 26,834.50
Jumlah : 2,439,204.24
Overhead & keuntungan 10% : 243,920.42
Jumlah : 2,683,124.66
Dibulatkan : 2,683,100.00

537,280.04
261,140.00 117,513.00
1,322.20 256,506.80
175,450.00 54,740.40
231,880.00 108,519.84
355,736.15
89,320.00 214,368.00
137,445.00 109,956.00
157,850.00 12,628.00
A.3.2.1.Pek.Pondasi / HAL 124 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
4 5 6
157,850.00 18,784.15
Jumlah : 893,016.19
Overhead & keuntungan 10% : 89,301.62
Jumlah : 982,317.81
Dibulatkan : 982,300.00

670,168.40
990.00 470,250.00
1,322.20 126,931.20
175,450.00 72,987.20
630,514.50
89,320.00 133,980.00
137,445.00 20,616.75
157,850.00 473,550.00
157,850.00 2,367.75
Jumlah : 1,300,682.90
Overhead & keuntungan 10% : 130,068.29
Jumlah : 1,430,751.19
Dibulatkan : 1,430,800.00

A.3.2.1.Pek.Pondasi / HAL 125 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
F.04 PEKERJAAN TIANG PANCANG
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan Bidang Sumber D

1 F.04.b 1M' Pemancangan Tiang pancang beton 25cm x 25cm


Tenaga Kerja
Pekerja 0.4800 org/hr
Tukang 0.0800 org/hr
Mandor 0.0480 org/hr
Bahan
Tiang pancang beton 25cm x 25cm 1.0300 m
Peralatan termasuk operator
Crane 5-10 ton 0.0800 Sewa/jam
Alat pancang 0.0800 Sewa/jam
Alat penyambung tiang pancang 0.2500 Sewa/jam

F.04.b 1M' Pemancangan Tiang pancang beton 25cm x 25cm


2 F.04.c 1M' Pemancangan Tiang pancang beton 30cm x 30cm
Tenaga Kerja
Pekerja 0.5400 org/hr
Tukang 0.0900 org/hr
Mandor 0.0540 org/hr
Bahan
Tiang pancang beton 30cm x 30cm 1.0300 m
Peralatan
Crane 5-10 ton 0.0900 Sewa/jam
Alat pancang 0.0900 Sewa/jam

F.04.c 1M' Pemancangan Tiang pancang beton 30cm x 30cm

3 F.04.d 1M' Pemancangan Tiang pancang beton 40cm x 40cm


Tenaga Kerja
Pekerja 0.6600 org/hr
Tukang 0.1100 org/hr
Mandor 0.0660 org/hr
Bahan
Tiang pancang beton 40cm x 40cm 1.0300 m
Peralatan termasuk operator
Crane 5-10 ton 0.1100 Sewa/jam
Alat pancang 0.1100 Sewa/jam

F.04.d 1M' Pemancangan Tiang pancang beton 40cm x 40cm

4 F.04.d1 1M' Sheet pile baja


F.04 ALS-PDS Non Standar / HAL 126 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Tenaga Kerja
Pekerja 0.0345 org/hr
Tukang 0.0069 org/hr
Tukang las listrik 0.0069 org/hr
Mandor 0.0034 org/hr
Operator Crane 0.0069 org/hr
Pembantu operator 0.0069 org/hr
Bahan
Sheet pile baja 1.0500 m
Peralatan termasuk operator
Crane 5-10 ton 0.0483 Sewa/jam
Alat pancang 0.0483 Sewa/jam
Las listrik Diesel 0.0483 Sewa/jam

F.04.d1 1M' Sheet pile baja

F.04 ALS-PDS Non Standar / HAL 127 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
5 F.04.d2 1 bh Potong/pecah kepala tiang pancang 40cm x 40cm
- Pemotongan Tiang Pancang 1.00 bh

F.04.d2 1 bh Potong/pecah kepala tiang pancang 40cm x 40cm

6 F.04.d2 1 bh Potong/pecah kepala tiang pancang 30 x 30

- Pemotongan Tiang Pancang 1.00 bh

F.04.d2 1 bh Potong/pecah kepala tiang pancang 30 x 30

F.04 ALS-PDS Non Standar / HAL 128 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

6 7 8

Penyempurnaan Bidang Sumber Daya Air

61,446.00
Rp 89,320.00 42,873.60
Rp 137,445.00 10,995.60
Rp 157,850.00 7,576.80
233,718.64
226,911.30 233,718.64
88,837.87
Rp 457,014.59 36,561.17
Rp 346,661.91 27,732.95
Rp 98,175.00 24,543.75

Jumlah : 384,002.51
Overhead & keuntungan 10% : 38,400.25
Jumlah : 422,402.76
Dibulatkan : 422,402.00

Rp 69,126.75
Rp 89,320.00 Rp 48,232.80
Rp 137,445.00 Rp 12,370.05
Rp 157,850.00 Rp 8,523.90
Rp 290,587.31
Rp 282,123.60 Rp 290,587.31
Rp 72,330.89
Rp 457,014.59 Rp 41,131.31
Rp 346,661.91 Rp 31,199.57

Jumlah : 432,044.94
Overhead & keuntungan 10% : 43,204.49
Jumlah : 475,249.44
Dibulatkan : 475,249.00

84,488.25
Rp 89,320.00 58,951.20
Rp 137,445.00 15,118.95
Rp 157,850.00 10,418.10
510,171.77
495,312.40 510,171.77
88,404.42
Rp 457,014.59 50,271.60
Rp 346,661.91 38,132.81

Jumlah : 683,064.44
Overhead & keuntungan 10% : 68,306.44
Jumlah : 751,370.88
Dibulatkan : 751,370.00

F.04 ALS-PDS Non Standar / HAL 129 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

6 7 8
7,406.40
Rp 89,320.00 3,081.54
Rp 137,445.00 948.37
Rp 137,445.00 948.37
Rp 157,850.00 536.69
Rp 184,800.00 1,275.12
Rp 89,320.00 616.31
499,187.50
475,416.67 499,187.50
43,559.43
Rp 457,014.59 22,073.80
Rp 346,661.91 16,743.77
Rp 98,175.00 4,741.85

Jumlah : 550,153.33
Overhead & keuntungan 10% : 55,015.33
Jumlah : 605,168.66
Dibulatkan : 605,168.00

F.04 ALS-PDS Non Standar / HAL 130 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH

6 7 8

245,000.00 245,000.00

Jumlah : 245,000.00
Overhead & keuntungan 10% : 24,500.00
Jumlah : 269,500.00
Dibulatkan : 269,500.00

60,000.00 60,000.00

Jumlah : 60,000.00
Overhead & keuntungan 10% : 6,000.00
Jumlah : 66,000.00
Dibulatkan : 66,000.00

F.04 ALS-PDS Non Standar / HAL 131 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
A. A. A.4.1.1 PEKERJAAN BETON
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan

1 A. A.4.1..1.4 1 m³ Membuat beton mutu fc=7,4 Mpa (K 100), slum (12 ± 2) cm, w/c = 0.87
-
Bahan
Portland Cement 230.000 kg
Pasir Beton 893.000 kg
Kerikil (maksimum 30 mm) 1,027.000 kg
Air 200.000 Liter
Tenaga Kerja
Pekerja 1.200 org/hr
Tukang Batu 0.200 org/hr
Kepala Tukang 0.020 org/hr
Mandor 0.060 org/hr

A. A.4.1..1.4 1 m³ Membuat beton mutu fc=7,4 Mpa (K 100), slum (12 ± 2) cm, w/c = 0.87

2 A. A.4.1..1.5 1 m³ Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm


-
Bahan
Portland Cement 283.620 kg
Pasir Beton 818.760 kg
Kerikil (maksimum 30 mm) 1,013.600 kg
Air 215.000 Liter
Tenaga Kerja
Pekerja 1.650 org/hr
Tukang Batu 0.275 org/hr
Kepala Tukang 0.028 org/hr
Mandor 0.083 org/hr

A. A.4.1..1.5 1 m³ Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm

3 A. A.4.1..1.6 1 m³ Membuat 1 m³ beton mutu K175, (slump 120 + 20) mm


-
Bahan
Portland Cement 326.325 kg
Pasir Beton 759.638 kg
Kerikil (maksimum 30 mm) 1,029.030 kg
Air 215.000 Liter
Tenaga Kerja
Pekerja 1.650 org/hr
Tukang Batu 0.275 org/hr
Kepala Tukang 0.028 org/hr
Mandor 0.083 org/hr

A. A.4.1..1.6 1 m³ Membuat 1 m³ beton mutu K175, (slump 120 + 20) mm

4 A. A.4.1.1.8 1 m³ Membuat beton mutu fc=21.7 Mpa (K 250), slum (12 ± 2) cm, w/c = 0.56

Bahan
Portland Cement 384.000 kg
Pasir Beton 692.000 kg
A.A.4.1.1 Pek.Beton / HAL 132 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Kerikil (maksimum 30 mm) 1,039.000 kg
Air 215.000 Liter
Tenaga Kerja
Pekerja 1.650 org/hr
Tukang Batu 0.275 org/hr
Kepala Tukang 0.028 org/hr
Mandor 0.083 org/hr

A. A.4.1.1.8 1 m³ Membuat beton mutu fc=21.7 Mpa (K 250), slum (12 ± 2) cm, w/c = 0.56

A.A.4.1.1 Pek.Beton / HAL 133 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
5 A. A.4.1.1.9 1 m³ Membuat beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53
-
Bahan
Portland Cement 406.000 kg
Pasir Beton 684.000 kg
Kerikil (maksimum 30 mm) 1,026.000 kg
Air 215.000 Liter
Tenaga Kerja
Pekerja 1.650 org/hr
Tukang Batu 0.275 org/hr
Kepala Tukang 0.028 org/hr
Mandor 0.083 org/hr

A. A.4.1.1.9 1 m³ Membuat beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53

6 A. A.4.1.1.10 1 m³ Membuat beton mutu fc=26.4 Mpa (K 300), slum (12 ± 2) cm, w/c = 0.52
-
Bahan
Portland Cement 413.000 kg
Pasir Beton 681.000 kg
Kerikil (maksimum 30 mm) 1,021.000 kg
Air 215.000 Liter
Tenaga Kerja
Pekerja 1.650 org/hr
Tukang Batu 0.275 org/hr
Kepala Tukang 0.028 org/hr
Mandor 0.083 org/hr

A. A.4.1.1.10 1 m³ Membuat beton mutu fc=26.4 Mpa (K 300), slum (12 ± 2) cm, w/c = 0.52

A.A.4.1.1 Pek.Beton / HAL 134 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
7 A. A.4.1.1.10a 1 m³ Beton K - 300 ( ready mix )
Bahan
Beton ready mix K 300 1.050 m³
Sewa pompa beton 1.000 unt/jam
Vibrator 0.800 jam
Tenaga Kerja
Pekerja 0.250 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.10a 1 m³ Beton K - 300 ( ready mix )


8 A. A.4.1.1.10b 1 m³ Beton K - 350 ( ready mix )
Bahan
Beton ready mix K 350 1.050 m³
Sewa pompa beton 1.000 m³
Vibrator 1.000 m³
Tenaga Kerja
Pekerja 0.250 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.10b 1 m³ Beton K - 350 ( ready mix )

9 A. A.4.1.1.10c 1 m³ Beton K - 375 ( ready mix )


Bahan
Beton ready mix K 350 1.050 m³
Sewa pompa beton 1.000 m³
Vibrator 1.000 m³
Tenaga Kerja
Pekerja 0.250 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.10c 1 m³ Beton K - 375 ( ready mix )

10 A. A.4.1.1.10d 1 m³ Beton K - 400 ( ready mix )


Bahan
Beton ready mix K 400 1.050 m³
Sewa pompa beton 1.000 m³
Vibrator 1.000 m³
Tenaga Kerja
Pekerja 0.250 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.004 org/hr

A.A.4.1.1 Pek.Beton / HAL 135 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
A. A.4.1.1.10d 1 m³ Beton K - 400 ( ready mix )

11 A. A.4.1.1.10e 1 m³ Beton K - 425 ( ready mix )


Bahan
Beton ready mix K 425 1.050 m³
Sewa pompa beton 1.000 m³
Vibrator 1.000 m³
Tenaga Kerja
Pekerja 0.250 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.10e 1 m³ Beton K - 425 ( ready mix )

12 A. A.4.1.1.10f 1 m³ Beton K - 500 ( ready mix )


Bahan
Beton ready mix K 500 1.050 m³
Sewa pompa beton 1.000 m³
Vibrator 1.000 m³
Tenaga Kerja
Pekerja 0.250 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.10f 1 m³ Beton K - 500 ( ready mix )

A.A.4.1.1 Pek.Beton / HAL 136 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5

13 A. A.4.1.1.14 1 m³ Memasang PVC waterstop L=150 mm


Bahan
Waterstop L=150 mm 1.050 m1
Tenaga Kerja
Pekerja 0.060 org/hr
Tukang Batu 0.030 org/hr
Kepala Tukang 0.003 org/hr
Mandor 0.003 org/hr

A. A.4.1.1.14 1 m³ Memasang PVC waterstop L=150 mm

14 A. A.4.1.1.15 1 m1 Memasang PVC waterstop L=200 mm


Bahan
Waterstop L=150 mm 1.050 m1
Tenaga Kerja
Pekerja 0.070 org/hr
Tukang Batu 0.035 org/hr
Kepala Tukang 0.004 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.15 1 m1 Memasang PVC waterstop L=200 mm

15 A. A.4.1.1.16 1 m1 Memasang PVC waterstop L=320 mm


Bahan
Waterstop L=150 mm 1.050 m1
Tenaga Kerja
Pekerja 0.080 org/hr
Tukang Batu 0.040 org/hr
Kepala Tukang 0.004 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.16 1 m1 Memasang PVC waterstop L=320 mm

16 A. A.4.1.1.17 Pembesian 10 kg Dengan Besi polos/Ulir


Bahan
Besi Beton (Polos/Ulir) 10.500 kg
Kawat Beton 0.150 kg
Tenaga Kerja
Pekerja 0.070 org/hr
Tukang Besi 0.070 org/hr
Kepala Tukang 0.007 org/hr
Mandor 0.004 org/hr

Pembesian tiap 10 kg
A. A.4.1.1.17 1 kg Pembesian tiap 1 kg

17 A. A.4.1.1.17a 1 m² Pekerjaan Wire Mesh M - 6


Bahan
A.A.4.1.1 Pek.Beton / HAL 137 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Wire Mesh M - 6 1.010 m²
Kawat Las 0.100 kg
Tenaga Kerja
Pekerja 0.100 org/hr
Tukang Besi 0.075 org/hr
Kepala Tukang Besi 0.008 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.17a 1 m² Pekerjaan Wire Mesh M - 6

18 A. A.4.1.1.17b 1 m² Pekerjaan Wire Mesh M - 7


Bahan
Wire Mesh M - 7 1.010 m²
Kawat Las 0.100 kg
Tenaga Kerja
Pekerja 0.100 org/hr
Tukang Besi 0.075 org/hr
Kepala Tukang Besi 0.008 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.17b 1 m² Pekerjaan Wire Mesh M - 7

A.A.4.1.1 Pek.Beton / HAL 138 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5

19 A. A.4.1.1.17c 1 m² Pekerjaan Wire Mesh M - 8


Bahan
Wire Mesh M - 8 1.010 m²
Kawat Las 0.100 kg
Tenaga Kerja
Pekerja 0.100 org/hr
Tukang Besi 0.075 org/hr
Kepala Tukang Besi 0.008 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.17c 1 m² Pekerjaan Wire Mesh M - 8

20 A. A.4.1.1.17d 1 m² Pekerjaan Wire Mesh M - 10


Bahan
Wire Mesh M - 10 1.010 m²
Kawat Las 0.100 kg
Tenaga Kerja
Pekerja 0.100 org/hr
Tukang Besi 0.075 org/hr
Kepala Tukang Besi 0.008 org/hr
Mandor 0.004 org/hr

A. A.4.1.1.17d 1 m² Pekerjaan Wire Mesh M - 10

21 A. A.4.1.1.20 1 m² Memasang Bekisting Untuk Pondasi ( 1 x pakai )


Bahan
Kayu Kelas III 0.040 m³
Paku 5 cm - 10 cm 0.300 kg
Minyak Bekisting 0.100 liter
Tenaga Kerja
Pekerja 0.520 org/hr
Tukang Kayu 0.260 org/hr
Kepala Tukang 0.026 org/hr
Mandor 0.026 org/hr

A. A.4.1.1.20 1 m² Memasang Bekisting Untuk Pondasi ( 1 x pakai )

22 A. A.4.1.1.21 1 m² Memasang Bekisting sloof ( 1 x pakai )


Bahan
Kayu Kelas III / Bekisting 0.045 m³
Paku 5 cm - 10 cm 0.300 kg
Minyak Bekisting 0.100 liter
Tenaga Kerja
Pekerja 0.520 org/hr
Tukang Kayu 0.260 org/hr
Kepala Tukang 0.026 org/hr
Mandor 0.026 org/hr

A.A.4.1.1 Pek.Beton / HAL 139 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
A. A.4.1.1.21 1 m² Memasang Bekisting sloof ( 1 x pakai )

23 A. A.4.1.1.22 1 m² Memasang Bekisting Untuk Kolom


Bahan
Kayu Kelas III ( kayu lokal ) 0.040 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal ) 0.015 m³
Plywood Tebal 9 mm 0.350 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 2.000 Batang
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.22 1 m² Memasang Bekisting Untuk Kolom

A.A.4.1.1 Pek.Beton / HAL 140 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5

24 A. A.4.1.1.22a 1 m² Memasang Bekisting Untuk Kolom ( 2 x pakai ) H < 800


Bahan
Kayu Kelas III ( kayu lokal )---2 x pakai 0.020 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal )---2 x pakai 0.008 m³
Plywood Tebal 9 mm---2 x pakai 0.175 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 1.000 Batang
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.22a 1 m² Memasang Bekisting Untuk Kolom ( 2 x pakai ) H < 800

25 A. A.4.1.1.22b 1 m² Memasang Bekisting Untuk Kolom ( 2 x pakai ) H > 800


Bahan
Kayu Kelas III ( kayu lokal )---2 x pakai 0.020 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal )---2 x pakai 0.008 m³
Plywood Tebal 15 mm---2 x pakai 0.175 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 1.000 Batang
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.22b 1 m² Memasang Bekisting Untuk Kolom ( 2 x pakai ) H > 800

25 A. A.4.1.1.23 1 m² Memasang Bekisting Untuk Balok ( 1 x pakai )


Bahan
Kayu Kelas III ( kayu lokal ) 0.040 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal ) 0.018 m³
Plywood Tebal 9 mm 0.350 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 2.000 Batang
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.23 1 m² Memasang Bekisting Untuk Balok ( 1 x pakai )

26 A. A.4.1.1.23a 1 m² Memasang Bekisting Untuk Balok ( 2 x pakai ) H < 800


Bahan

A.A.4.1.1 Pek.Beton / HAL 141 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Kayu Kelas III ( kayu lokal )---2 x pakai 0.020 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal )---2 x pakai 0.009 m³
Plywood Tebal 9 mm---2 x pakai 0.175 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 1.000 Batang
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.23a 1 m² Memasang Bekisting Untuk Balok ( 2 x pakai ) H < 800

27 A. A.4.1.1.23b 1 m² Memasang Bekisting Untuk Balok ( 2 x pakai ) H > 800


Bahan
Kayu Kelas III ( kayu lokal )---2 x pakai 0.020 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal )---2 x pakai 0.009 m³
Plywood Tebal 15 mm---2 x pakai 0.175 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 1.000 Batang
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.23b 1 m² Memasang Bekisting Untuk Balok ( 2 x pakai ) H > 800

A.A.4.1.1 Pek.Beton / HAL 142 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5

28 A. A.4.1.1.24 1 m² Memasang Bekisting Untuk lantai


Bahan
Kayu Kelas III ( kayu lokal ) 0.040 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal ) 0.015 m³
Plywood Tebal 9 mm 0.350 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 6.000 Batang
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.24 1 m² Memasang Bekisting Untuk lantai

29 A. A.4.1.1.23a 1 m² Memasang Bekisting Untuk plat lantai ( 2 x pakai )


Bahan
Kayu Kelas III ( kayu lokal )---2 x pakai 0.020 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal )---2 x pakai 0.008 m³
Plywood Tebal 9 mm---2 x pakai 0.175 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 3.000 Batang
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.23a 1 m² Memasang Bekisting Untuk plat lantai ( 2 x pakai )

30 A. A.4.1.1.25 1 m² Memasang Bekisting Untuk Dinding


Bahan
Kayu Kelas III ( kayu lokal ) 0.030 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal ) 0.020 m³
Plywood Tebal 9 mm---2 x pakai 0.175 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 3.000 Batang
Formite/Penjaga Jarak Bekisting 4.000 Buah
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.25 1 m² Memasang Bekisting Untuk Dinding

31 A. A.4.1.1.25a 1 m² Memasang Bekisting Untuk Dinding ( 2 x pakai )


A.A.4.1.1 Pek.Beton / HAL 143 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Bahan
Kayu Kelas III ( kayu lokal )---2 x pakai 0.015 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.200 liter
Balok Kayu Kelas III ( kayu lokal )---2 x pakai 0.010 m³
Plywood Tebal 9 mm---2 x pakai 0.175 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 1.500 Batang
Formite/Penjaga Jarak Bekisting 4.000 Buah
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.25a 1 m² Memasang Bekisting Untuk Dinding ( 2 x pakai )

32 A. A.4.1.1.26 1 m² Memasang Bekisting Untuk Tangga


Bahan
Kayu Kelas III ( kayu lokal )---2 x pakai 0.030 m³
Paku 5 cm - 12 cm 0.400 kg
Minyak Bekisting 0.150 liter
Balok Kayu Kelas III ( kayu lokal )---2 x pakai 0.015 m³
Plywood Tebal 9 mm---2 x pakai 0.350 lbr
Dolken Kayu Galam. Dia (8-10) cm Panjang 4 m 2.000 Batang
Tenaga Kerja
Pekerja 0.660 org/hr
Tukang Kayu 0.330 org/hr
Kepala Tukang 0.033 org/hr
Mandor 0.033 org/hr

A. A.4.1.1.26 1 m² Memasang Bekisting Untuk Tangga

A.A.4.1.1 Pek.Beton / HAL 144 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5

33 A. A.4.1.1.35 1 m' Kolom Praktis Beton Bertulang (11 x 11) cm


Bahan
Kayu Kelas III 0.002 m³
Paku 5 cm - 12 cm 0.010 kg

Besi Beton Polos 3.000 kg


Kawat Beton 0.460 kg
Portlan Cement 4.000 kg
Pasir Beton 0.006 m³
Kerikil/batu split ukuran 1x2cm 0.009 m³
Tenaga Kerja
Pekerja 0.180 org/hr
Tukang Batu 0.020 org/hr
Tukang Kayu 0.020 org/hr
Tukang Besi 0.020 org/hr
Kepala Tukang 0.006 org/hr
Mandor 0.009 org/hr

A. A.4.1.1.35 1 m' Kolom Praktis Beton Bertulang (11 x 11) cm

34 A. A.4.1.1.36 1 m' Ring Balok Beton Bertulang/balok lintel (10 x 15) cm


Bahan
Kayu Kelas III 0.003 m³
Paku 5 cm - 12 cm 0.020 kg

Besi Beton Polos 3.600 kg


Kawat Beton 0.050 kg
Portlan Cement 5.500 kg
Pasir Beton 0.009 m³
Kerikil 0.015 m³
Tenaga Kerja
Pekerja 0.297 org/hr
Tukang Batu 0.033 org/hr
Tukang Kayu 0.033 org/hr
Tukang Besi 0.033 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.015 org/hr

A. A.4.1.1.36 1 m' Ring Balok Beton Bertulang/balok lintel (10 x 15) cm

35 A. A.4.1.2.25 1 m' Joint Sealant


Bahan
Polyethylene Foam 1.050 m'
Sealant 0.200 kg
Cutter Concrete 0.020 bh
Tenaga Kerja
Pekerja 0.080 org/hr
Tukang batu 0.080 org/hr
Kepala Tukang 0.008 org/hr
Mandor 0.004 org/hr

A.A.4.1.1 Pek.Beton / HAL 145 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5

A. A.4.1.2.25 1 m' Joint Sealant

36 A. A.4.1.2.26 1 m1 Gutter Lebar 20 cm dalam 10 cm


Bahan: - Sement PC 0.252 zk
- Pasir Beton 0.046 m3

Upah: - Pekerja terampil 0.065 hari


- Tukang 0.038 hari
- Kepala Tukang 0.003 hari
- Mandor 0.003 hari

A. A.4.1.2.26 1 m1 Gutter Lebar 20 cm dalam 10 cm

A.A.4.1.1 Pek.Beton / HAL 146 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5

37 A. A.4.1.2.27 1 m1 Gutter Lebar 25 cm dalam 10 cm


Bahan: - Sement PC 0.326 zk
- Pasir Beton 0.101 m3

Upah: - Pekerja terampil 0.065 hari


- Tukang 0.038 hari
- Kepala Tukang 0.003 hari
- Mandor 0.003 hari

A. A.4.1.2.27 1 m1 Gutter Lebar 25 cm dalam 10 cm

38 A. A.4.1.2.28 1 m1 Waterproofing Integral Per M3 Beton


Bahan: Waterproofing Integral Per M3 Beton 0.970 m3

Upah: - Pekerja terampil 0.250 hari


- Tukang 0.500 hari
- Kepala Tukang 0.050 hari
- Mandor 0.013 hari

A. A.4.1.2.28 1 m1 Waterproofing Integral Per M3 Beton


39 A. A.4.1.2.29 1 m3 Grouting tebal 25 mm (Tidak campuran)

Bahan: - Sement Grout 1.100 m3


- Air 400.000 lt
Upah: - Pekerja 3.000 hari
- Tukang 3.750 hari
- Kepala Tukang 0.200 hari
- Mandor 0.020 hari

A. A.4.1.2.29 1 m3 Grouting tebal 25 mm (Tidak campuran)


40 1 m2 Finish permukaan perkerasan beton

Bahan:

Upah: - Pekerja 0.050 hari


- Tukang 0.050 hari
- Kepala Tukang 0.005 hari
- Mandor 0.003 hari

- 1 m2 Finish permukaan perkerasan beton

41 A. A.4.1.1.17 Pembesian 10 kg Dengan Besi polos/Ulir U-50


Bahan
Besi Beton (Polos/Ulir) 10.500 kg
Kawat Beton 0.150 kg
A.A.4.1.1 Pek.Beton / HAL 147 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Tenaga Kerja
Pekerja 0.070 org/hr
Tukang Besi 0.070 org/hr
Kepala Tukang 0.007 org/hr
Mandor 0.004 org/hr

Pembesian tiap 10 kg
A. A.4.1.1.17 1 kg Pembesian tiap 1 kg

A.A.4.1.1 Pek.Beton / HAL 148 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8

578,318.46
1,322.20 304,106.00
125.32 111,912.04
128.82 132,300.42
150.00 30,000.00
147,301.00
89,320.00 107,184.00
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 9,471.00
Jumlah : 725,619.46
Overhead & keuntungan 10% : 72,561.95
Jumlah : 798,181.00

640,434.74
1,322.20 375,002.36
125.32 102,608.17
128.82 130,574.20
150.00 32,250.00
202,696.73
89,320.00 147,378.00
137,445.00 37,797.38
157,850.00 4,419.80
157,850.00 13,101.55
Jumlah : 843,131.47
Overhead & keuntungan 10% : 84,313.15
Jumlah : 927,444.00

691,477.77
1,322.20 431,466.92
125.32 95,198.92
128.82 132,561.93
150.00 32,250.00
202,696.73
89,320.00 147,378.00
137,445.00 37,797.38
157,850.00 4,419.80
157,850.00 13,101.55
Jumlah : 894,174.49
Overhead & keuntungan 10% : 89,417.45
Jumlah : 983,591.00

760,543.52
1,322.20 507,724.80
125.32 86,722.43
A.A.4.1.1 Pek.Beton / HAL 149 DARI 616
HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8
128.82 133,846.29
150.00 32,250.00
202,696.73
89,320.00 147,378.00
137,445.00 37,797.38
157,850.00 4,419.80
157,850.00 13,101.55
Jumlah : 963,240.24
Overhead & keuntungan 10% : 96,324.02
Jumlah : 1,059,564.27
Dibulatkan : Rp 1,059,500.00

A.A.4.1.1 Pek.Beton / HAL 150 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8

786,954.66
1,322.20 536,813.20
125.32 85,719.86
128.82 132,171.60
150.00 32,250.00
202,696.73
89,320.00 147,378.00
137,445.00 37,797.38
157,850.00 4,419.80
157,850.00 13,101.55
Jumlah : 989,651.38
Overhead & keuntungan 10% : 98,965.14
Jumlah : 1,088,616.52
Dibulatkan : Rp 1,088,600.00

795,189.98
1,322.20 546,068.60
125.32 85,343.89
128.82 131,527.49
150.00 32,250.00
202,696.73
89,320.00 147,378.00
137,445.00 37,797.38
157,850.00 4,419.80
157,850.00 13,101.55
Jumlah : 997,886.71
Overhead & keuntungan 10% : 99,788.67
Jumlah : 1,097,675.38
Dibulatkan : Rp 1,097,600.00

A.A.4.1.1 Pek.Beton / HAL 151 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8

1,286,791.00
1,153,020.00 1,210,671.00
71,500.00 71,500.00
5,775.00 4,620.00
38,284.40
89,320.00 22,330.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 631.40
Jumlah : 1,325,075.40
Overhead & keuntungan 10% : 132,507.54
Jumlah : 1,457,582.94
Dibulatkan : Rp 1,457,500.00

1,356,784.00
1,218,580.00 1,279,509.00
71,500.00 71,500.00
5,775.00 5,775.00
38,284.40
89,320.00 22,330.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 631.40
Jumlah : 1,395,068.40
Overhead & keuntungan 10% : 139,506.84
Jumlah : 1,534,575.24
Dibulatkan : Rp 1,534,500.00

1,151,425.00
1,023,000.00 1,074,150.00
71,500.00 71,500.00
5,775.00 5,775.00
38,284.40
89,320.00 22,330.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 631.40
Jumlah : 1,189,709.40
Overhead & keuntungan 10% : 118,970.94
Jumlah : 1,308,680.34
Dibulatkan : Rp 1,308,600.00

1,433,938.00
1,292,060.00 1,356,663.00
71,500.00 71,500.00
5,775.00 5,775.00
38,284.40
89,320.00 22,330.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 631.40
Jumlah : 1,472,222.40
Overhead & keuntungan 10% : 147,222.24
Jumlah : 1,619,444.64
A.A.4.1.1 Pek.Beton / HAL 152 DARI 616
HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8
Dibulatkan : Rp 1,619,400.00

1,508,782.00
1,363,340.00 1,431,507.00
71,500.00 71,500.00
5,775.00 5,775.00
38,284.40
89,320.00 22,330.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 631.40
Jumlah : 1,547,066.40
Overhead & keuntungan 10% : 154,706.64
Jumlah : 1,701,773.04
Dibulatkan : Rp 1,701,700.00

1,551,748.00
1,404,260.00 1,474,473.00
71,500.00 71,500.00
5,775.00 5,775.00
38,284.40
89,320.00 22,330.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 631.40
Jumlah : 1,590,032.40
Overhead & keuntungan 10% : 159,003.24
Jumlah : 1,749,035.64
Dibulatkan : Rp 1,749,000.00

A.A.4.1.1 Pek.Beton / HAL 153 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8

111,226.50
105,930.00 111,226.50
10,429.65
89,320.00 5,359.20
137,445.00 4,123.35
157,850.00 473.55
157,850.00 473.55
Jumlah : 121,656.15
Overhead & keuntungan 10% : 12,165.62
Jumlah : 133,821.77
Dibulatkan : Rp 133,800.00

145,414.50
138,490.00 145,414.50
12,325.78
89,320.00 6,252.40
137,445.00 4,810.58
157,850.00 631.40
157,850.00 631.40
Jumlah : 157,740.28
Overhead & keuntungan 10% : 15,774.03
Jumlah : 173,514.30
Dibulatkan : Rp 173,500.00

15,592.50
14,850.00 15,592.50
13,906.20
89,320.00 7,145.60
137,445.00 5,497.80
157,850.00 631.40
157,850.00 631.40
Jumlah : 29,498.70
Overhead & keuntungan 10% : 2,949.87
Jumlah : 32,448.57
Dibulatkan : Rp 32,400.00

124,063.50
11,550.00 121,275.00
18,590.00 2,788.50
17,609.90
89,320.00 6,252.40
137,445.00 9,621.15
157,850.00 1,104.95
157,850.00 631.40
Jumlah : 141,673.40
Overhead & keuntungan 10% : 14,167.34
Jumlah : 155,840.74
Dibulatkan : 155,800.00
Jumlah : Rp 15,580.00

46,107.12
A.A.4.1.1 Pek.Beton / HAL 154 DARI 616
HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8
42,644.67 43,071.12
30,360.00 3,036.00
21,016.19
89,320.00 8,932.00
137,445.00 10,308.38
157,850.00 1,183.88
157,850.00 591.94
Jumlah : 67,123.30
Overhead & keuntungan 10% : 6,712.33
Jumlah : 73,835.63
Dibulatkan : Rp 73,800.00

61,660.58
58,044.13 58,624.58
30,360.00 3,036.00
21,016.19
89,320.00 8,932.00
137,445.00 10,308.38
157,850.00 1,183.88
157,850.00 591.94
Jumlah : 82,676.76
Overhead & keuntungan 10% : 8,267.68
Jumlah : 90,944.44
Dibulatkan : Rp 90,900.00

A.A.4.1.1 Pek.Beton / HAL 155 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8

79,606.87
75,812.75 76,570.87
30,360.00 3,036.00
21,016.19
89,320.00 8,932.00
137,445.00 10,308.38
157,850.00 1,183.88
157,850.00 591.94
Jumlah : 100,623.06
Overhead & keuntungan 10% : 10,062.31
Jumlah : 110,685.37
Dibulatkan : Rp 110,600.00

122,677.99
118,457.42 119,641.99
30,360.00 3,036.00
21,016.19
89,320.00 8,932.00
137,445.00 10,308.38
157,850.00 1,183.88
157,850.00 591.94
Jumlah : 143,694.18
Overhead & keuntungan 10% : 14,369.42
Jumlah : 158,063.60
Dibulatkan : Rp 158,000.00

93,361.40
2,158,310.00 86,332.40
18,370.00 5,511.00
15,180.00 1,518.00
90,390.30
89,320.00 46,446.40
137,445.00 35,735.70
157,850.00 4,104.10
157,850.00 4,104.10
Jumlah : 183,751.70
Overhead & keuntungan 10% : 18,375.17
Jumlah : 202,126.87
Dibulatkan : Rp 202,100.00

104,152.95
2,158,310.00 97,123.95
18,370.00 5,511.00
15,180.00 1,518.00
90,390.30
89,320.00 46,446.40
137,445.00 35,735.70
157,850.00 4,104.10
157,850.00 4,104.10
Jumlah : 194,543.25
Overhead & keuntungan 10% : 19,454.33
Jumlah : 213,997.58
A.A.4.1.1 Pek.Beton / HAL 156 DARI 616
HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8
Dibulatkan : Rp 213,900.00

254,238.05
2,158,310.00 86,332.40
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 32,374.65
143,220.00 50,127.00
37,510.00 75,020.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 368,964.20
Overhead & keuntungan 10% : 36,896.42
Jumlah : 405,860.62
Dibulatkan : Rp 405,800.00

A.A.4.1.1 Pek.Beton / HAL 157 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8

132,311.03
2,158,310.00 43,166.20
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 16,187.33
143,220.00 25,063.50
37,510.00 37,510.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 247,037.18
Overhead & keuntungan 10% : 24,703.72
Jumlah : 271,740.89
Dibulatkan : Rp 271,700.00

145,150.78
2,158,310.00 43,166.20
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 16,187.33
216,590.00 37,903.25
37,510.00 37,510.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 259,876.93
Overhead & keuntungan 10% : 25,987.69
Jumlah : 285,864.62
Dibulatkan : Rp 285,800.00

260,712.98
2,158,310.00 86,332.40
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 38,849.58
143,220.00 50,127.00
37,510.00 75,020.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 375,439.13
Overhead & keuntungan 10% : 37,543.91
Jumlah : 412,983.04
Dibulatkan : Rp 412,900.00

135,548.49

A.A.4.1.1 Pek.Beton / HAL 158 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8
2,158,310.00 43,166.20
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 19,424.79
143,220.00 25,063.50
37,510.00 37,510.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 250,274.64
Overhead & keuntungan 10% : 25,027.46
Jumlah : 275,302.10
Dibulatkan : Rp 275,300.00

148,388.24
2,158,310.00 43,166.20
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 19,424.79
216,590.00 37,903.25
37,510.00 37,510.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 263,114.39
Overhead & keuntungan 10% : 26,311.44
Jumlah : 289,425.83
Dibulatkan : Rp 289,400.00

A.A.4.1.1 Pek.Beton / HAL 159 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8

323,674.45
143,220.00 5,728.80
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 32,374.65
143,220.00 50,127.00
37,510.00 225,060.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 438,400.60
Overhead & keuntungan 10% : 43,840.06
Jumlah : 482,240.66
Dibulatkan : Rp 482,200.00

181,336.38
216,590.00 4,331.80
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 16,187.33
216,590.00 37,903.25
37,510.00 112,530.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 296,062.53
Overhead & keuntungan 10% : 29,606.25
Jumlah : 325,668.78
Dibulatkan : Rp 325,600.00

255,440.30
143,220.00 4,296.60
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 43,166.20
143,220.00 25,063.50
37,510.00 112,530.00
15,000.00 60,000.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 370,166.45
Overhead & keuntungan 10% : 37,016.65
Jumlah : 407,183.10
Dibulatkan : Rp 407,100.00

A.A.4.1.1 Pek.Beton / HAL 160 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8
175,443.90
143,220.00 2,148.30
18,370.00 7,348.00
15,180.00 3,036.00
2,158,310.00 21,583.10
143,220.00 25,063.50
37,510.00 56,265.00
15,000.00 60,000.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 290,170.05
Overhead & keuntungan 10% : 29,017.01
Jumlah : 319,187.06
Dibulatkan : Rp 319,100.00

171,443.25
143,220.00 4,296.60
18,370.00 7,348.00
15,180.00 2,277.00
2,158,310.00 32,374.65
143,220.00 50,127.00
37,510.00 75,020.00
114,726.15
89,320.00 58,951.20
137,445.00 45,356.85
157,850.00 5,209.05
157,850.00 5,209.05
Jumlah : 286,169.40
Overhead & keuntungan 10% : 28,616.94
Jumlah : 314,786.34
Dibulatkan : Rp 314,700.00

A.A.4.1.1 Pek.Beton / HAL 161 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8

55,058.63
2,158,310.00 4,316.62
18,370.00 183.70

11,110.00 33,330.00
18,590.00 8,551.40
1,322.20 5,288.80
175,450.00 1,052.70
259,490.00 2,335.41
26,692.05
89,320.00 16,077.60
137,445.00 2,748.90
137,445.00 2,748.90
137,445.00 2,748.90
157,850.00 947.10
157,850.00 1,420.65
Jumlah : 81,750.68
Overhead & keuntungan 10% : 8,175.07
Jumlah : 89,925.75
Dibulatkan : Rp 89,900.00

60,511.33
2,158,310.00 6,474.93
18,370.00 367.40

11,110.00 39,996.00
18,590.00 929.50
1,322.20 7,272.10
175,450.00 1,579.05
259,490.00 3,892.35
44,081.35
89,320.00 26,528.04
137,445.00 4,535.69
137,445.00 4,535.69
137,445.00 4,535.69
157,850.00 1,578.50
157,850.00 2,367.75
Jumlah : 104,592.68
Overhead & keuntungan 10% : 10,459.27
Jumlah : 115,051.94
Dibulatkan : Rp 115,000.00

9,788.64
3,500.00 3,675.00
30,318.20 6,063.64
2,500.00 50.00
20,035.40
89,320.00 7,145.60
137,445.00 10,995.60
157,850.00 1,262.80
157,850.00 631.40
Jumlah : 29,824.04
Overhead & keuntungan 10% : 2,982.40

A.A.4.1.1 Pek.Beton / HAL 162 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8
Jumlah : 32,806.44
Dibulatkan : Rp 32,800.00

66,110.00 16,642.56 24,711.76


175,450.00 8,069.21

89,320.00 5,805.80 11,907.09


137,445.00 5,154.19
157,850.00 473.55
157,850.00 473.55
Jumlah : 36,618.85
Overhead & keuntungan 10% : 3,661.89
Jumlah : 40,280.74
Dibulatkan : Rp 40,200.00

A.A.4.1.1 Pek.Beton / HAL 163 DARI 616


HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8

66,110.00 21,551.86 39,359.66


175,450.00 17,807.80

89,320.00 5,805.80 11,907.09


137,445.00 5,154.19
157,850.00 473.55
157,850.00 473.55
Jumlah : 51,266.75
Overhead & keuntungan 10% : 5,126.67
Jumlah : 56,393.42
Dibulatkan : Rp 56,300.00

190,000.00 184,300.00 184,300.00

89,320.00 22,330.00 100,997.05


137,445.00 68,722.50
157,850.00 7,892.50
157,850.00 2,052.05
Jumlah : 285,297.05
Overhead & keuntungan 10% : 28,529.71
Jumlah : 313,826.76
Dibulatkan : Rp 313,800.00

11,827,200.00 13,009,920.00 13,069,920.00


150.00 60,000.00
89,320.00 267,960.00 818,105.75
137,445.00 515,418.75
157,850.00 31,570.00
157,850.00 3,157.00
Jumlah : 13,888,025.75
Overhead & keuntungan 10% : 1,388,802.58
Jumlah : 15,276,828.33
Dibulatkan : Rp 15,276,800.00

89,320.00 4,466.00 12,522.13


137,445.00 6,872.25
157,850.00 789.25
157,850.00 394.63
Jumlah : 12,522.13
Overhead & keuntungan 10% : 1,252.21
Jumlah : 13,774.34
Dibulatkan : Rp 13,700.00

119,443.50
11,110.00 116,655.00
18,590.00 2,788.50
A.A.4.1.1 Pek.Beton / HAL 164 DARI 616
HARGA STUAN SUB. Jumlah : JUMLAH

6 7 8
17,609.90
89,320.00 6,252.40
137,445.00 9,621.15
157,850.00 1,104.95
157,850.00 631.40
Jumlah : 137,053.40
Overhead & keuntungan 10% : 13,705.34
Jumlah : 150,758.74
Dibulatkan : 150,800.00
Jumlah : Rp 15,080.00

A.A.4.1.1 Pek.Beton / HAL 165 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
A.4.2.1 PEKERJAAN BESI DAN ALUMUNIUM
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
1 1 kg Memasang besi profil
Bahan
Besi Profil 1.1500 kg
Tenaga Kerja
Pekerja 0.0600 org/hr
Tukang Las 0.0600 org/hr
Kepala Tukang 0.0060 org/hr
Mandor 0.0030 org/hr

1 1 kg Memasang besi profil

2 1 kg Memasang rangka kuda-kuda Baja IWF


Bahan
Besi Baja IWF 1.1500 kg
Tenaga Kerja
Pekerja 0.0600 org/hr
Tukang Las 0.0600 org/hr
Kepala Tukang 0.0060 org/hr
Mandor 0.0030 org/hr

2 1 kg Memasang rangka kuda-kuda Baja IWF

2.a 1 kg Memasang Rangka Kuda - Kuda Baja L dan Canal


Bahan
Besi Baja Siku 1.1500 kg
Tenaga Kerja
Pekerja 0.0600 org/hr
Tukang Las 0.0600 org/hr
Kepala Tukang 0.0060 org/hr
Mandor 0.0030 org/hr

2.a 1 kg Memasang Rangka Kuda - Kuda Baja L dan Canal

2.b 1 kg Memasang Plat Baja t=……


Bahan
Plat Baja t=….. 1.1500 kg
Tenaga Kerja
Pekerja 0.0600 org/hr
Tukang Las 0.0600 org/hr
Kepala Tukang 0.0060 org/hr
Mandor 0.0030 org/hr

2.b 1 kg Memasang Plat Baja t=……

A.4.2.1.Pek.Besi&Allm / HAL 166 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

3 100 kg Mengerjakan Pekerjaan Perakitan


Bahan
Solar Industri 1.0000 liter
Minyak Pelumas 0.1000 liter
Tenaga Kerja
Pekerja 0.1000 org/hr
Tukang Besi 0.1000 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0050 org/hr
Alat
Sewa Alat Genset 0.8000 jam

100 kg Mengerjakan Pekerjaan Perakitan


3 1 kg Mengerjakan Pekerjaan Perakitan

4 1 m² Membuat Pintu Besi Plat Baja Tebal 2 mm Rangkap. Rangka Baja Siku
Bahan
Besi Siku L 30.30.3 15.0000 kg
Besi Plat Baja 32.8000 kg
Kawat Las 0.0500 kg
Tenaga Kerja
Pekerja 1.0500 org/hr
Tukang las 1.0500 org/hr
Kepala Tukang 0.1050 org/hr
Mandor 0.0520 org/hr

4 1 m² Membuat Pintu Besi Plat Baja Tebal 2 mm Rangkap. Rangka Baja Siku

5 10 cm1 Mengerjakan Pengelasan Dengan Las Listrik


Bahan
Kawat Las Listrik 0.4000 kg
Solar 0.3000 liter
Minyak Pelumas 0.0400 liter
Tenaga Kerja
Pekerja 0.0400 org/hr
Tukang las 0.0200 org/hr
Kepala Tukang 0.0020 org/hr
Mandor 0.0020 org/hr
Alat
Sewa Alat Genset 40KVA 0.1700 jam

5 10 cm1 Mengerjakan Pengelasan Dengan Las Listrik

5a 1 kg Memasang rangka kuda-kuda Baja IWF (Termasuk pengelasan dan perakitan)


Harga terpasang :
Analisa no.2 Besi Baja IWF 1.0000 kg
Analisa no.3 Perakitan 1.0000 kg
Analisa no.5 Pengelasan 1.0000 cm

5a 1 kg Memasang rangka kuda-kuda Baja IWF (Termasuk pengelasan dan perakitan)


A.4.2.1.Pek.Besi&Allm / HAL 167 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

5b 1 kg Memasang rangka kuda-kuda Baja C, UNP dan L ( Termasuk pengelasan dan pera
Harga terpasang :
Analisa no.4 Besi Baja C, UNP dan L 1.0000 kg
Analisa no.3 Perakitan 1.0000 kg
Analisa no.5 Pengelasan 1.0000 cm

5b 1 kg Memasang rangka kuda-kuda Baja C, UNP dan L ( Termasuk pengelasan dan pera

5c 1 kg Memasang Plat baja ( Termasuk pengelasan dan perakitan )


Harga terpasang :
Analisa no.2 Besi Baja plat 1.0000 kg
Analisa no.3 Perakitan 1.0000 kg
Analisa no.5 Pengelasan 1.0000 cm

5c 1 kg Memasang Plat baja ( Termasuk pengelasan dan perakitan )

A.4.2.1.Pek.Besi&Allm / HAL 168 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

5d 1 bh Angkur baut M12mm


Bahan
Angkur baut M12mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5d 1 bh Angkur baut M12mm


5e 1 bh Angkur baut M16mm
Bahan
Angkur baut M16mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5e 1 bh Angkur baut M16mm


5f 1 bh Angkur baut M19mm
Bahan
Angkur baut M19mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5f 1 bh Angkur baut M19mm


5g 1 bh Angkur baut M20mm
Bahan
Angkur baut M20mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5g 1 bh Angkur baut M20mm


5h 1 bh Angkur baut M36mm
Bahan
Angkur baut M32mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5h 1 bh Angkur baut M36mm


5i 1 bh Mur baut M12mm
Bahan
A.4.2.1.Pek.Besi&Allm / HAL 169 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Mur baut M12mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5i 1 bh Mur baut M12mm


5j 1 bh Mur baut M16mm
Bahan
Mur baut M16mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5j 1 bh Mur baut M16mm

A.4.2.1.Pek.Besi&Allm / HAL 170 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
5k 1 bh Mur baut M19/20mm
Bahan
Mur baut M19/20mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5k 1 bh Mur baut M19/20mm


5l 1 bh Mur baut M22mm
Bahan
Mur baut M22mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5l 1 bh Mur baut M22mm


5m 1 bh Mur baut M32mm
Bahan
Mur baut M32mm 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0100 org/hr
Kepala Tukang 0.0010 org/hr
Mandor 0.0005 org/hr

5m 1 bh Mur baut M32mm


5n 1 bh Walter moor
Bahan
Walter moor 1.1000 bh
Tenaga Kerja
Pekerja 0.0100 org/hr
Tukang Las 0.0200 org/hr
Kepala Tukang 0.0020 org/hr
Mandor 0.0010 org/hr

5n 1 bh Walter moor

6 1 m² Membuat Rangka Jendela Besi Scuare Tube (25 x 5) cm


Bahan
Besi Scuare Tube 4.7600 m
Besi Lis Kaca (1 x 1) cm 4.5220 m
Pengelasan 20.0000 cm
Tenaga Kerja
Pekerja 0.6500 org/hr
Tukang las 0.6500 org/hr
Kepala Tukang 0.0650 org/hr
Mandor 0.0320 org/hr

A.4.2.1.Pek.Besi&Allm / HAL 171 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
6 1 m² Membuat Rangka Jendela Besi Scuare Tube (25 x 5) cm

7 1 m² Memasang Pintu Rolling Door Besi


Bahan
Pintu Gulung Besi 1.0000 m²
Tenaga Kerja
Pekerja 0.4400 org/hr
Tukang las 0.4400 org/hr
Kepala Tukang 0.0440 org/hr
Mandor 0.0220 org/hr

7 1 m² Memasang Pintu Rolling Door Besi

A.4.2.1.Pek.Besi&Allm / HAL 172 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

8 1 m² Memasang Pintu Lipat (Folding Door) bahan aluminium


Bahan
Polding geet 1.0000 m²
Tenaga Kerja
Pekerja 0.4400 org/hr
Tukang Besi 0.4400 org/hr
Kepala Tukang 0.0440 org/hr
Mandor 0.0220 org/hr

8 1 m² Memasang Pintu Lipat (Folding Door) bahan aluminium

9 1 m² Memasang Jalusi Alumunium


Bahan
Jalusi Alumunium t=2mm 1.0000 m²
Tenaga Kerja
Pekerja 0.0800 org/hr
Tukang khusus alumunium 0.8000 org/hr
Kepala Tukang 0.0800 org/hr
Mandor 0.0040 org/hr

9 1 m² Memasang Jalusi Alumunium

10 1 m² Memasang Rolling Door t=0.8mm + Motor penggerak


Terpasang
Rolling Door t=0.8mm + Motor penggerak 1.0000 m²

10 1 m² Memasang Rolling Door t=0.8mm + Motor penggerak

11 1 m² Memasang Kusen Pintu Alumunium 4" tebal 1.2mm


Bahan
Bahan Kusen Aluminium 4" tebal 1.35mm setara
YKK finish setara Anodized Plus Min. ketebalan 18 1.1000 m
Micron
Skrup Fixer 2.0000 buah
Sealant 0.0600 tube
Tenaga Kerja
Pekerja 0.0430 org/hr
Tukang khusus alumunium 0.0430 org/hr
Kepala Tukang 0.0043 org/hr
Mandor 0.0021 org/hr

11 1 m² Memasang Kusen Pintu Alumunium 4" tebal 1.2mm

11a 1 m² Memasang Kusen Pintu Alumunium 3" tebal 1.2mm


Bahan
Bahan Kusen Aluminium 3" tebal 1.35mm setara
YKK finish setara Anodized Plus Min. ketebalan 18 1.1000 m
Micron
A.4.2.1.Pek.Besi&Allm / HAL 173 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Skrup Fixer 2.0000 buah
Sealant 0.0600 tube
Tenaga Kerja
Pekerja 0.0430 org/hr
Tukang khusus alumunium 0.0430 org/hr
Kepala Tukang 0.0043 org/hr
Mandor 0.0021 org/hr

11a 1 m² Memasang Kusen Pintu Alumunium 3" tebal 1.2mm

A.4.2.1.Pek.Besi&Allm / HAL 174 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

12 1 m² Memasang Pintu Alumunium Strip Lebar 8 cm


Bahan
Profil Alumunium 4.4000 m'
Alumunium Strip 14.6000 m'
Tenaga Kerja
Pekerja 0.0850 org/hr
Tukang khusus alumunium 0.0850 org/hr
Kepala Tukang 0.0085 org/hr
Mandor 0.0042 org/hr

12 1 m² Memasang Pintu Alumunium Strip Lebar 8 cm

13 1 m² Memasang Pintu Kaca Rangka Alumunium


Bahan
Profil Alumunium 4.4000 m
Profil Kaca 4.5000 m
Sealant 0.2700 tube
Tenaga Kerja
Pekerja 0.0850 org/hr
Tukang Besi 0.0850 org/hr
Kepala Tukang 0.0090 org/hr
Mandor 0.0050 org/hr

13 1 m² Memasang Pintu Kaca Rangka Alumunium

13a 1 m² Memasang Jendela Kaca Rangka Alumunium


Bahan
Profil Alumunium jendela l=6cm 4.400 m
Profil Kaca 4.500 m
Sealant 0.270 tube
Tenaga Kerja
Pekerja 0.085 org/hr
Tukang Besi 0.085 org/hr
Kepala Tukang 0.009 org/hr
Mandor 0.005 org/hr

13a 1 m² Memasang Jendela Kaca Rangka Alumunium

14 1 m² Memasang Venetions Blinds dan Vertical Blinds


Bahan
Venetions Blinds dan Vertical Blinds 1.0000 m
Tenaga Kerja
Pekerja 0.3500 org/hr
Tukang Besi 0.3500 org/hr
Kepala Tukang 0.0350 org/hr
Mandor 0.0180 org/hr

14 1 m² Memasang Venetions Blinds dan Vertical Blinds

A.4.2.1.Pek.Besi&Allm / HAL 175 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

15 1 m² Memasang Teralis Besi Strip (2 x 3) mm


Bahan
Besi Strip 6.1770 kg
Pengelasan 27.0800 cm
Tenaga Kerja
Pekerja 1.6700 org/hr
Tukang Besi 1.6700 org/hr
Kepala Tukang 0.1670 org/hr
Mandor 0.0830 org/hr

15 1 m² Memasang Teralis Besi Strip (2 x 3) mm

16 1 m² Memasang Kawat Nyamuk


Bahan
Kawat Nyamuk 1.1000 m²
Pengelasan 11.1100 cm
Besi Strip (0.2 x 2) cm 1.7160 kg
Tenaga Kerja
Pekerja 0.1000 org/hr
Tukang Besi 0.1000 org/hr
Kepala Tukang 0.0100 org/hr
Mandor 0.0050 org/hr

16 1 m² Memasang Kawat Nyamuk

A.4.2.1.Pek.Besi&Allm / HAL 176 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

17 1 m² Memasang Jendela Nako & tralis


Bahan
Jendela Nako (Rangka+Kaca 5 mm) 1.1000 m²
Paku Skrup 1 cm - 2.5 cm 10.0000 buah
Besi Strip 7.0000 m
Tenaga Kerja
Pekerja 0.2000 org/hr
Tukang Besi 0.2000 org/hr
Kepala Tukang 0.0200 org/hr
Mandor 0.0010 org/hr

17 1 m² Memasang Jendela Nako & tralis

18 1 m1 Memasang Talang Datar / Jurai alumunium Lebar 90 cm


Bahan
Alumunium Plat 1.0500 m'
Paku Skrup 1 cm - 2.5 cm 0.0150 kg
Papan Kayu Kelas II Atau III 0.0190 m³
Tenaga Kerja
Pekerja 0.2000 org/hr
Tukang Besi 0.2000 org/hr
Kepala Tukang 0.0200 org/hr
Mandor 0.0010 org/hr

18 1 m1 Memasang Talang Datar / Jurai alumunium Lebar 90 cm

19 1 m1 Memasang Talang 1/2 Lingkaran D-15 cm Alumunium


Bahan
Alumunium Plat 1.05 m'
Paku Skrup 1 cm - 2.5 cm 0.01 kg
Besi Strip 0.94 kg
Tenaga Kerja
Pekerja 0.15 org/hr
Tukang Besi 0.30 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

19 1 m1 Memasang Talang 1/2 Lingkaran D-15 cm Alumunium

20 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk par
Bahan
Hollow 4 x 4 cm t=2mm
Assesoris 3.50 m'
(perkuatan, las dll) 100% x rangka 1.00 LS
Tenaga Kerja
Tukang 0.25 org/hr
Pekerja 0.25 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

A.4.2.1.Pek.Besi&Allm / HAL 177 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
20 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk pa

20a 1 m² Pemasangan 1 m2 rangka besi hollow galpanis 1x40.40.0.35mm, modul 60 x 120 cm


Bahan
Hollow galvanises 4 x 4 cm
Assesoris 3.50 btg
(perkuatan, las dll) 100% x rangka 1.00 LS
Tenaga Kerja
Tukang 0.25 org/hr
Pekerja 0.25 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

20a 1 m² Pemasangan 1 m2 rangka besi hollow galpanis 1x40.40.0.35mm, modul 60 x 120 c

A.4.2.1.Pek.Besi&Allm / HAL 178 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

20b 1 m² Pemasangan 1 m2 rangka Metal BMSys, modul 60 x 120, untuk partisi


Bahan
Metal Wall Stud 0.57 pc(s)
Metal Wall Track 0.22 pc(s)
Jointing Compound UB-10/20/888/CCL 20kg/bag(s) 0.04 bag(s)
UB Tape 75m/roll(s) 0.03 roll(s)
Drywall Screw 25mmX083 24.31 pc(s)
Tenaga Kerja
Tukang 0.25 org/hr
Pekerja 0.25 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

20b 1 m² Pemasangan 1 m2 rangka Metal BMSys, modul 60 x 120, untuk partisi

21 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm


Bahan
Hollow 4 x 4las
(perkuatan, cmdll)
t=2mm
30% x rangka 4.00 m'
1.00 LS
Tenaga Kerja
Tukang 0.25 org/hr
Pekerja 0.25 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

21 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm

21a 1 m² Pemasangan 1 m2 rangka besi hollow galpanis 1x40.40.0,35mm, modul 60 x 120 cm


Bahan
Hollow galpanis 4 x 4 cm t=0.35mm
Assesoris 4.00 m'
(perkuatan, las dll) 100% x rangka 1.00 LS
Tenaga Kerja
Tukang 0.25 org/hr
Pekerja 0.25 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

21a 1 m² Pemasangan 1 m2 rangka besi hollow galpanis 1x40.40.0,35mm, modul 60 x 120 c

21b 1 m² Pasang rangka metal furing BMSys ( Untuk ceilling panel 600 x 1200 )
Bahan
Bracket PN-220 / PN-221 1.04 pc(s)
Suspension Rod 2400mm PN-409 0.26 pc(s)
Suspension Clip Adjuster PN-410 1.04 pc(s)
Wall Angel 3000mm PN-408 0.13 pc(s)
Main Tee 3600mm PN-400 0.22 pc(s)
Cross Tee 600mm PN-401 - pc(s)
Cross Tee 1200mm PN-401 1.44 pc(s)
Tenaga Kerja
Tukang 0.25 org/hr
A.4.2.1.Pek.Besi&Allm / HAL 179 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Pekerja 0.25 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

21b 1 m² Pasang rangka metal furing BMSys ( Untuk ceilling panel 600 x 1200 )

23 1 m1 Railling tangga dari kaca dengan hand railling kayu


1. Bahan : Hand railing kayu 0.01 m3
Finish melamik 0.36 m2
Kaca clear temper 12mm 1.88 m2
Mur Ring 2.00 bh
Dop tutup dudukan tangga 2.00 bh
Dinabolt Ø 12 m 4.00 bh
kenip kaca 4.00 bh
Kawat las 0.50 kg
2. Upah : Upah pembuatan & pemasangan
Kepala Tukang 0.18 hari
Tukang Las 1.80 hari
Pekerja 1.80 hari
Mandor 0.09 hari

23 1 m1 Railling tangga dari kaca dengan hand railling kayu

A.4.2.1.Pek.Besi&Allm / HAL 180 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
24 1 m1 Railling tangga dari pipa Stainles
1. Bahan : Hand railing pipa Stainlees steel Ø 2 1/2" 1.100 m1
Tiang railing pipa Stainlees steel Ø 2" 0.975 m1
Kisi-kisi railing pipa Stainlees steel Ø 1" 4.000 m1
Mur Ring 2.000 bh
Dop tutup dudukan tangga 2.000 bh
Dinabolt Ø 12 m 4.000 bh
Kawat las stainlees 0.750 kg
2. Upah : Upah pembuatan & pemasangan
Kepala Tukang 0.120 hari
Tukang Las 1.200 hari
Pekerja 1.200 hari
Mandor 0.060 hari

24 1 m1 Railling tangga dari pipa Stainles

25 1 m1 Railling tangga tipe dari pipa BSP


1. Bahan : Hand railing pipa BSP Ø 2 1/2" 1.100 m1
Tiang railing pipa BSP Ø 2" 0.975 m1
Kisi-kisi railing pipa BSP Ø 1" 4.000 m1
Mur Ring 2.000 bh
Dop tutup dudukan tangga 2.000 bh
Dinabolt Ø 12 m 4.000 bh
Kawat las 0.750 kg
2. Upah : Upah pembuatan & pemasangan
Kepala Tukang 0.102 hari
Tukang Las 1.020 hari
Pekerja 1.020 hari
Mandor 0.051 hari

3. finishing cat duco 0.837 m2


25 1 m1 Railling tangga tipe dari pipa BSP

26 1 m1 Hand Railling tangga dari pipa stainless steel


1. Bahan : Hand railing pipa SS Ø 2 1/2" 1.100 m1
Tiang railing pipa SS Ø 2" 0.375 m1
Mur Ring 2.000 bh
Dop tutup dudukan tangga 2.000 bh
Dinabolt Ø 12 m 3.000 bh
Kawat las 0.188 kg
2. Upah : Upah pembuatan & pemasangan
Kepala Tukang 0.051 hari
Tukang Las 0.510 hari
Pekerja 0.510 hari
Mandor 0.026 hari

A.4.2.1.Pek.Besi&Allm / HAL 181 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
26 1 m1 Hand Railling tangga dari pipa stainless steel

27 1 Unit Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
Partisi cubical lengkap : 1 unit
- Partisi Phenolic resin Board ex. D'CUBICS
tebal 12mm, (100% kedap air )
- Pintu Phenolic resin Board ex. D'CUBICS uk.
800x1800x12 mm,(100% kedap air )
- Door hardware stainless steel accessories
- Rangka frame alumunium N/A
- Kaki pedestal dan Screw conection stainless
steel

27 1 Unit Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :

A.4.2.1.Pek.Besi&Allm / HAL 182 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

28 1 m2 Pasang dinding Zinc - Allumunium colorbond TCT 0.45mm


a. Bahan:
Atap zincalume Kliplok CB. 0.50 TCT Colorbond 1.0500 m2
- Paku hak panjang 15 cm 0.2000 kg
b. Upah:
- Kepala Tukang las 0.0100 hari
- Tukang las 0.1000 hari
- Pekerja 0.2000 hari
- Mandor 0.0100 hari
c. Rangka terpasang :
- Rangka baja C. 100.50.20.2,3 2.400 kg

28 1 m2 Pasang dinding Zinc - Allumunium colorbond TCT 0.45mm

30 1 m² Pekerjaan Alumunium Composite Panel Exterior


1 Harga Terpasang
Rangka alumunium hollow 33x38x2mm, MF, bracket
aluminium hollow 40x40x4 zincromate + silicone 1.050 m2
sealant dan accessories
Panel Lapis Aluminum Tebal total 4mm (lapis
aluminum tebal 0,5mm + core FR + 0,5mm) finish
1.050 m2
PVDF 70/30 3 layer dicoating anti-graffiti & dust
repellent
Upah:
Upar pasang 1.000 m2
Alat bantu :
Sewa scafolding + bongkar pasang 1.000 m2

30 1 m² Pekerjaan Alumunium Composite Panel Exterior

30a 1 m² Pekerjaan Alumunium Composite Panel Interior


1 Harga Terpasang
Rangka alumunium hollow 33x38x2mm, MF, bracket
aluminium hollow 40x40x4 zincromate + silicone 1.050 m2
sealant dan accessories
Panel Lapis Aluminum Tebal total 4mm (lapis
aluminum tebal 0,5mm + core FR + 0,5mm) finish
1.050 m2
PVDF 70/30 3 layer dicoating anti-graffiti & dust
repellent
Upah:
Upar pasang 1.000 m2
Alat bantu :
Sewa scafolding + bongkar pasang 1.000 m2

30a 1 m² Pekerjaan Alumunium Composite Panel Interior

31 1 m1 Memasang jalusi Alumunium hollow 40x40 tebal 0.35mm


Bahan
Besi hollow galvanis 40/60 mm t= 0.35mm 1.1000 m
A.4.2.1.Pek.Besi&Allm / HAL 183 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Skrup 2.0000 buah
Tenaga Kerja
Pekerja 0.0323 org/hr
Tukang khusus alumunium 0.0323 org/hr
Kepala Tukang 0.0032 org/hr
Mandor 0.0016 org/hr

31 1 m1 Memasang jalusi Alumunium hollow 40x40 tebal 0.35mm

32 1 m1 Grill stainless stell l=350


1. Bahan : Plat stainless stell t=3mm 0.468 m2
Dinabolt Ø 12 m 2.500 bh
Kawat las stainlees 0.250 kg
2. Upah : Upah pembuatan & pemasangan
Kepala Tukang 0.120 hari
Tukang Las 1.200 hari
Pekerja 1.200 hari
Mandor 0.060 hari

32 1 m1 Grill stainless stell l=350

A.4.2.1.Pek.Besi&Allm / HAL 184 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

33 1 m' Handrail Bar tipe BR-1200 setara Pawling


1. Bahan : Handrail Bar tipe BR-1200 setara Pawling 1.050 m1
2. Upah :
Pekerja 0.200 hari
Tukang 0.100 hari
Kepala Tukang 0.010 hari
Mandor 0.005 hari

33 1 m' Handrail Bar tipe BR-1200 setara Pawling

34 1 m2 Pasang Buffer plate / Kicking plate Stainless stell Hairline


1. Bahan : Pelat Stainless stell Hairline 1.100 m2
2. Upah : Upah pembuatan & pemasangan
Pekerja 0.250 hari
Tukang 0.250 hari
Kepala Tukang 0.025 hari
Mandor 0.013 hari

34 1 m2 Pasang Buffer plate / Kicking plate Stainless stell Hairline

36 1 m1 pasang Memasang "U" Channel Stainless Steel Uk 3x3cm


1. Bahan : U Channel Stainless Steel Uk 3x3cm 1.100 m1
2. Upah : Upah pembuatan & pemasangan
Pekerja 0.150 hari
Tukang 0.150 hari
Kepala Tukang 0.015 hari
Mandor 0.008 hari

36 1 m1 pasang Memasang "U" Channel Stainless Steel Uk 3x3cm

37 1 unit Memasang tangga monyet dari pipa Stainless steel t=±5m


1. Bahan : Pipa SS Ø 2 1/2" 1.667 btg
Pipa SS Ø 2" 0.833 btg
Dop tutup dudukan tangga 4.000 bh
Dinabolt Ø 12 m 8.000 bh
Kawat las 0.250 kg
2. Upah : Upah pembuatan & pemasangan
Pekerja 0.560 hari
Tukang 0.056 hari
Kepala Tukang 0.560 hari
Mandor 0.031 hari

37 1 unit Memasang tangga monyet dari pipa Stainless steel t=±5m


A.4.2.1.Pek.Besi&Allm / HAL 185 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

38 1 unit Pintu gerbang


1. Bahan : Pipa besi BSP SCH. Ø 4” 45.198 m1
Pipa besi BSP SCH. Ø 3” 13.944 m1
Pipa besi BSP SCH. Ø 1,5” 121.254 m1
Kunci gembok/Padlock tipe PL-BC-BRS-70mm-KD + 2.000 bh
Roda bulat 12.000 bh
Tubular Pull Handle dari besi beton Ø 25" 11.554 kg
Pasang selot Flushbolt dari besi beton Ø 16" 6.310 kg
Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( U 4.000 bh
Cat Kayu/besi Duco 32.705 m2
2. Upah : Upah pembuatan & pemasangan
Pekerja 16.494 hari
Tukang 16.494 hari
Kepala Tukang 1.649 hari
Mandor 0.812 hari

38 1 unit Pintu gerbang

A.4.2.1.Pek.Besi&Allm / HAL 186 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
39 1 unit Type P.1 Kusen berikut daun pintu baja & accessories setara Bostinco
Terpasang Pintu baja single fire door finish cat anti karat,
Hardware setara Griff, Ukuran 2200 x 1000 setara
Bostinco ( Harga Terpasang ) 1.000 unit

39 1 unit Type P.1 Kusen berikut daun pintu baja & accessories setara Bostinco

40 1 unit Type P.2 Kusen berikut daun pintu baja & accessories setara Bostinco
Terpasang Pintu baja double fire door finish cat anti karat,
Hardware setara Griff, Ukuran 2200 x 1900 setara
Bostinco ( Harga Terpasang ) 1.000 unit

40 1 unit Type P.2 Kusen berikut daun pintu baja & accessories setara Bostinco

41 1 unit Tipe P.3 Pintu baja double fire door finish cat anti karat, Hardware setara Griff
Terpasang Pintu baja double steel door finish cat anti karat,
Hardware setara Griff, Ukuran 2100 x 1800 setara
Bostinco ( Harga Terpasang ) 1.000 unit

41 1 unit Tipe P.3 Pintu baja double fire door finish cat anti karat, Hardware setara Griff

42 1 unit Tipe P.4 Pintu baja double fire door finish cat anti karat, Hardware setara Griff
Terpasang Pintu baja double steel door finish cat anti karat,
Hardware setara Griff, Ukuran 2200 x 1300 setara
Bostinco ( Harga Terpasang ) 1.000 unit

42 1 unit Tipe P.4 Pintu baja double fire door finish cat anti karat, Hardware setara Griff

43 1 unit TipeP.5 Pintu baja single door finish cat anti karat, Hardware setara Griff, setara Bo
Terpasang Pintu single steel door finish cat anti karat,
Hardware setara Griff, Ukuran 900 x 2000 setara
Bostinco ( Harga Terpasang ) 1.000 unit

43 1 unit TipeP.5 Pintu baja single door finish cat anti karat, Hardware setara Griff, setara Bo

44 1 unit Tipe P.6 Kusen berikut Pintu baja double shaft steel door finish cat anti karat, Hard
Terpasang Pintu baja double shaft steel door finish cat anti
karat, Hardware setara Griff, Ukuran 1200 x 1200
setara Bostinco ( Harga Terpasang ) 1.000 unit

A.4.2.1.Pek.Besi&Allm / HAL 187 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

44 1 unit Tipe P.6 Kusen berikut Pintu baja double shaft steel door finish cat anti karat, Hard

45 1 unit Tipe P.7 Kusen berikut Pintu baja single shaft steel door finish cat anti karat, Hardw
Terpasang Pintu baja single shaft steel door finish cat anti
karat, Hardware setara Griff, Ukuran 120 x 800
setara Bostinco ( Harga Terpasang ) 1.000 unit

45 1 unit Tipe P.7 Kusen berikut Pintu baja single shaft steel door finish cat anti karat, Hardw

46 1 unit Tangga servis tipe 1 tipe dari pipa BSP finish cat duco
1. Bahan : Tiang pipa BSP Ø 2 1/2" 21.516 m1
Injakan pipa BSP Ø 1 1/5" 13.200 m1
Dop tutup dudukan 14.000 bh
Dinabolt Ø 12 m 28.000 bh
Kawat las 3.750 kg
2. Upah : Upah pembuatan & pemasangan
Pekerja 3.500 hari
Tukang Las 3.500 hari
Kepala Tukang 0.350 hari
Mandor 0.175 hari

3. finishing cat duco 6.648 m2


46 1 unit Tangga servis tipe 1 tipe dari pipa BSP finish cat duco

A.4.2.1.Pek.Besi&Allm / HAL 188 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
47 1 unit Tangga servis tipe 3 tipe dari pipa BSP finish cat duco
1. Bahan : Tiang pipa BSP Ø 2 1/2" 16.060 m1
Injakan pipa BSP Ø 1 1/5" 11.200 m1
Dop tutup dudukan 12.000 bh
Dinabolt Ø 12 m 24.000 bh
Kawat las 3.750 kg
2. Upah : Upah pembuatan & pemasangan
Pekerja 2.000 hari
Tukang Las 2.000 hari
Kepala Tukang 0.200 hari
Mandor 0.100 hari

3. finishing cat duco 5.089 m2


47 1 unit Tangga servis tipe 3 tipe dari pipa BSP finish cat duco

48 1 bh Manhole Pelat baja + rangka baja finish cat duco, ukuran 600x600
Bahan
Rangka siku 50x50x5mm 19.0159 kg
Plat baja t=3mm 8.4240 kg
Kawat las 0.750 kg
Dinabolt Ø 12 m 10.000 bh
Tenaga Kerja
Pekerja 1.5000 org/hr
Tukang las 1.5000 org/hr
Kepala Tukang 0.1500 org/hr
Mandor 0.0750 org/hr

3. finishing cat duco 0.720 m2


48 1 bh Manhole Pelat baja + rangka baja finish cat duco, ukuran 600x600

49 1 m² Pemasangan 1 m2 rangka besi hollow 1x50x50.2mm, modul 100 x 100 cm


Bahan
Hollow 5 x 5 cm t=2mm
Assesoris 4.00 m'
(perkuatan, las dll) 100% x rangka 1.00 LS
Tenaga Kerja
Tukang 0.25 org/hr
Pekerja 0.25 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

49 1 m² Pemasangan 1 m2 rangka besi hollow 1x50x50.2mm, modul 100 x 100 cm

49 1 m² Pemasangan 1 m2 pagar besi hollow 20x80x3,8 dan 20x80x2,2mm finish cat duco
Harga terpasang
A.4.2.1 2.a Hollow 80x100x2,5mm 39.56 kg
A.4.2.1 2.a Baja U 75x40x5x7 4.80 kg
A.4.2.1 2.a Hollow 20x80x2,2mm 290.14 kg
A.4.2.1 2.a Hollow 20x80x3.8mm 28.64 kg
A.4.2.1 5 Pengelasan 181.57 cm
A.4.7.1 Finishing cat duco 21.17 m2
A.4.2.1.Pek.Besi&Allm / HAL 189 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

6.72 m2
1.00 m2
49 1 m² Pemasangan 1 m2 pagar besi hollow 20x80x3,8 dan 20x80x2,2mm finish cat duco

50 1 unit Tipe P.21 Kusen berikut Pintu baja single shaft steel door finish cat anti karat, Hard
Terpasang Pintu baja single shaft steel door finish cat anti
karat, Hardware setara Griff, Ukuran 60 x 800
setara Bostinco ( Harga Terpasang ) 1.000 unit

50 1 unit Tipe P.21 Kusen berikut Pintu baja single shaft steel door finish cat anti karat, Hard

51 1 m² Pemasangan 1 m2 rangka besi hollow 50.50.2mm, modul 60 x 120 cm, untuk atap
Bahan
Hollow 5 x 5las
(perkuatan, cmdll)
t=2mm
30% x rangka 4.00 m'
1.00 LS
Tenaga Kerja
Tukang 0.25 org/hr
Pekerja 0.25 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

A.4.2.1.Pek.Besi&Allm / HAL 190 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
52 1 m1 Railling pengaman curtain wall dari pipa Stainles
1. Bahan : Hand railing pipa Stainlees steel Ø 2 1/2" 1.100 m1
Tiang railing pipa Stainlees steel Ø 2 1/2" 0.600 m1
Mur Ring 2.000 bh
Dop tutup dudukan tangga 2.000 bh
Dinabolt Ø 12 m 4.000 bh
Kawat las stainlees 0.750 kg
2. Upah : Upah pembuatan & pemasangan
Kepala Tukang 0.120 hari
Tukang Las 1.200 hari
Pekerja 1.200 hari
Mandor 0.060 hari

52 1 m1 Railling pengaman curtain wall dari pipa Stainles


53 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm
Bahan
Hollow 4 x 4las
(perkuatan, cmdll)
t=2mm
30% x rangka 4.00 m'
1.00 LS
Tenaga Kerja
Tukang 0.25 org/hr
Pekerja 0.25 org/hr
Kepala Tukang 0.03 org/hr
Mandor 0.01 org/hr

53 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm


0 1 M1 Pemasangan 1 m1 rangka besi hollow 1x40.40.2mm

A.4.2.1.Pek.Besi&Allm / HAL 191 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

15,306.50
13,310.00 15,306.50
15,026.55
89,320.00 5,359.20
137,445.00 8,246.70
157,850.00 947.10
157,850.00 473.55
Jumlah 30,333.05
Overhead & keuntungan 10% : 3,033.31
Jumlah : 33,366.36
Dibulatkan : 33,300.00

15,306.50
13,310.00 15,306.50
15,026.55
89,320.00 5,359.20
137,445.00 8,246.70
157,850.00 947.10
157,850.00 473.55
Jumlah 30,333.05
Overhead & keuntungan 10% : 3,033.31
Jumlah : 33,366.36
Dibulatkan : 33,300.00

15,306.50
13,310.00 15,306.50
15,026.55
89,320.00 5,359.20
137,445.00 8,246.70
157,850.00 947.10
157,850.00 473.55
Jumlah 30,333.05
Overhead & keuntungan 10% : 3,033.31
Jumlah : 33,366.36
Dibulatkan : 33,300.00

15,306.50
13,310.00 15,306.50
15,026.55
89,320.00 5,359.20
137,445.00 8,246.70
157,850.00 947.10
157,850.00 473.55
Jumlah 30,333.05
Overhead & keuntungan 10% : 3,033.31
Jumlah : 33,366.36
Dibulatkan : 33,300.00

A.4.2.1.Pek.Besi&Allm / HAL 192 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

10,000.00
6,500.00 6,500.00
35,000.00 3,500.00
23,623.60
89,320.00 8,932.00
137,445.00 13,744.50
157,850.00 157.85
157,850.00 789.25
76,000.00
95,000.00 76,000.00
Jumlah 109,623.60
Overhead & keuntungan 10% : 10,962.36
Jumlah : 120,585.96
Dibulatkan : 120,500.00
Dibulatkan per 1 kg : 1,205.00

670,736.00
15,510.00 232,650.00
13,310.00 436,568.00
30,360.00 1,518.00
262,885.70
89,320.00 93,786.00
137,445.00 144,317.25
157,850.00 16,574.25
157,850.00 8,208.20
Jumlah 933,621.70
Overhead & keuntungan 10% : 93,362.17
Jumlah : 1,026,983.87
Dibulatkan : 1,026,900.00

16,544.00
30,360.00 12,144.00
8,000.00 2,400.00
50,000.00 2,000.00
6,953.10
89,320.00 3,572.80
137,445.00 2,748.90
157,850.00 315.70
157,850.00 315.70

75,000.00 12,750.00 12,750.00


Jumlah 36,247.10
Overhead & keuntungan 10% : 3,624.71
Jumlah : 39,871.81
Dibulatkan : 39,800.00
Dibulatkan per 1 cm: 3,980.00

33,300.00 33,300.00
1,205.00 1,205.00
3,980.00 3,980.00

Jumlah 38,485.00
F (Termasuk pengelasan dan perakitan) Dibulatkan : 38,400.00
A.4.2.1.Pek.Besi&Allm / HAL 193 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

UNP dan L ( Termasuk pengelasan dan perakitan )

33,300.00 33,300.00
1,205.00 1,205.00
3,840.00 3,840.00

Jumlah 38,345.00
UNP dan L ( Termasuk pengelasan dan perakitan ) Dibulatkan : 38,300.00

33,300.00 33,300.00
1,205.00 1,205.00
3,830.00 3,830.00

Jumlah 38,335.00
Dibulatkan : 38,300.00

A.4.2.1.Pek.Besi&Allm / HAL 194 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

49,500.00
45,000.00 49,500.00
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 52,004.43
Overhead & keuntungan 10% : 5,200.44
Jumlah : 57,200.00

66,000.00
60,000.00 66,000.00
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 68,504.43
Overhead & keuntungan 10% : 6,850.44
Jumlah : 75,400.00

78,375.00
71,250.00 78,375.00
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 80,879.43
Overhead & keuntungan 10% : 8,087.94
Jumlah : 89,000.00

9,020.00
71,250.00 9,020.00
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 11,524.43
Overhead & keuntungan 10% : 1,152.44
Jumlah : 12,700.00

33,330.00
135,000.00 33,330.00
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 35,834.43
Overhead & keuntungan 10% : 3,583.44
Jumlah : 39,400.00

8,488.70
A.4.2.1.Pek.Besi&Allm / HAL 195 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7
8,488.70
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 10,993.13
Overhead & keuntungan 10% : 1,099.31
Jumlah : 12,100.00

20,010.10
20,010.10
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 22,514.53
Overhead & keuntungan 10% : 2,251.45
Jumlah : 24,800.00

A.4.2.1.Pek.Besi&Allm / HAL 196 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

25,011.80
25,011.80
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 27,516.23
Overhead & keuntungan 10% : 2,751.62
Jumlah : 30,300.00

13,750.00
13,750.00
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 16,254.43
Overhead & keuntungan 10% : 1,625.44
Jumlah : 17,900.00

33,765.60
33,765.60
2,504.43
89,320.00 893.20
137,445.00 1,374.45
157,850.00 157.85
157,850.00 78.93
Jumlah 36,270.03
Overhead & keuntungan 10% : 3,627.00
Jumlah : 39,900.00

87,924.10
87,924.10
4,115.65
89,320.00 893.20
137,445.00 2,748.90
157,850.00 315.70
157,850.00 157.85
Jumlah 92,039.75
Overhead & keuntungan 10% : 9,203.98
Jumlah : 101,200.00

355,119.20
47,500.00 226,100.00
12,500.00 56,525.00
3,624.71 72,494.20
162,708.70
89,320.00 58,058.00
137,445.00 89,339.25
157,850.00 10,260.25
157,850.00 5,051.20
Jumlah 517,827.90
Overhead & keuntungan 10% : 51,782.79
Jumlah : 569,610.69
A.4.2.1.Pek.Besi&Allm / HAL 197 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7
Dibulatkan : 569,600.00

325,000.00
325,000.00 325,000.00
110,194.70
89,320.00 39,300.80
137,445.00 60,475.80
157,850.00 6,945.40
157,850.00 3,472.70
Jumlah 435,194.70
Overhead & keuntungan 10% : 43,519.47
Jumlah : 478,714.17
Dibulatkan : 478,700.00

A.4.2.1.Pek.Besi&Allm / HAL 198 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

667,012.50
667,012.50 667,012.50
110,194.70
89,320.00 39,300.80
137,445.00 60,475.80
157,850.00 6,945.40
157,850.00 3,472.70
Jumlah 777,207.20
Overhead & keuntungan 10% : 77,720.72
Jumlah : 854,927.92
Dibulatkan : 854,900.00

264,110.00
264,110.00 264,110.00
130,361.00
89,320.00 7,145.60
137,445.00 109,956.00
157,850.00 12,628.00
157,850.00 631.40
Jumlah 394,471.00
Overhead & keuntungan 10% : 39,447.10
Jumlah : 433,918.10
Dibulatkan : 433,900.00

1,334,025.00
1,334,025.00 1,334,025.00

Jumlah 1,334,025.00
Overhead & keuntungan 10% : 133,402.50
Jumlah : 1,467,427.50
Dibulatkan : 1,467,400.00

246,819.09

220,000.00 242,000.00

1,500.00 3,000.00
30,318.20 1,819.09
10,761.14
89,320.00 3,840.76
137,445.00 5,910.14
157,850.00 678.76
157,850.00 331.49
Jumlah 257,580.23
Overhead & keuntungan 10% : 25,758.02
Jumlah : 283,338.25
Dibulatkan : 283,300.00

210,519.09

187,000.00 205,700.00

A.4.2.1.Pek.Besi&Allm / HAL 199 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7
1,500.00 3,000.00
30,318.20 1,819.09
10,761.14
89,320.00 3,840.76
137,445.00 5,910.14
157,850.00 678.76
157,850.00 331.49
Jumlah 221,280.23
Overhead & keuntungan 10% : 22,128.02
Jumlah : 243,408.25
Dibulatkan : 243,400.00

A.4.2.1.Pek.Besi&Allm / HAL 200 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

1,150,500.00
220,000.00 968,000.00
12,500.00 182,500.00
21,279.72
89,320.00 7,592.20
137,445.00 11,682.83
157,850.00 1,341.73
157,850.00 662.97
Jumlah 1,171,779.72
Overhead & keuntungan 10% : 117,177.97
Jumlah : 1,288,957.69
Dibulatkan : 1,288,900.00

1,032,435.91
220,000.00 968,000.00
12,500.00 56,250.00
30,318.20 8,185.91
21,484.93
89,320.00 7,592.20
137,445.00 11,682.83
157,850.00 1,420.65
157,850.00 789.25
Jumlah 1,053,920.84
Overhead & keuntungan 10% : 105,392.08
Jumlah : 1,159,312.92
Dibulatkan : 1,159,300.00

394,435.91
75,000.00 330,000.00
12,500.00 56,250.00
30,318.20 8,185.91
21,484.93
89,320.00 7,592.20
137,445.00 11,682.83
157,850.00 1,420.65
157,850.00 789.25
Jumlah 415,920.84
Overhead & keuntungan 10% : 41,592.08
Jumlah : 457,512.92
Dibulatkan : 457,500.00

75,000.00
75,000.00 75,000.00
87,733.80
89,320.00 31,262.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 2,841.30
Jumlah 162,733.80
Overhead & keuntungan 10% : 16,273.38
Jumlah : 179,007.18
Dibulatkan : 179,000.00

A.4.2.1.Pek.Besi&Allm / HAL 201 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

180,373.02
13,310.00 82,215.87
3,624.71 98,157.15
418,160.05
89,320.00 149,164.40
137,445.00 229,533.15
157,850.00 26,360.95
157,850.00 13,101.55
Jumlah 598,533.07
Overhead & keuntungan 10% : 59,853.31
Jumlah : 658,386.37
Dibulatkan : 658,300.00

76,860.49
12,500.00 13,750.00
3,624.71 40,270.53
13,310.00 22,839.96
25,044.25
89,320.00 8,932.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 789.25
Jumlah 101,904.74
Overhead & keuntungan 10% : 10,190.47
Jumlah : 112,095.21
Dibulatkan : 112,000.00

A.4.2.1.Pek.Besi&Allm / HAL 202 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

292,006.00
175,000.00 192,500.00
633.60 6,336.00
13,310.00 93,170.00
48,667.85
89,320.00 17,864.00
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 157.85
Jumlah 340,673.85
Overhead & keuntungan 10% : 34,067.39
Jumlah : 374,741.24
Dibulatkan : 374,700.00

2,274,735.76
2,117,500.00 2,223,375.00
42,988.00 644.82
2,669,260.00 50,715.94
48,667.85
89,320.00 17,864.00
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 157.85
Jumlah 2,323,403.61
Overhead & keuntungan 10% : 232,340.36
Jumlah : 2,555,743.97
Dibulatkan : 2,555,700.00

2,236,342.90
2,117,500.00 2,223,375.00
42,988.00 429.88
13,310.00 12,538.02
60,629.80
89,320.00 13,398.00
137,445.00 41,233.50
157,850.00 4,735.50
157,850.00 1,262.80
Jumlah 2,296,972.70
Overhead & keuntungan 10% : 229,697.27
Jumlah : 2,526,669.97
Dibulatkan : 2,526,600.00

1x40.40.2mm, modul 60 x 120 cm, untuk partisi


65,321.67
9,331.67 32,660.83
32,660.83 32,660.83
62,216.00
137,445.00 34,361.25
89,320.00 22,330.00
157,850.00 3,946.25
157,850.00 1,578.50
Jumlah 127,537.67
Overhead & keuntungan 10% : 12,753.77
Jumlah : 140,291.43
A.4.2.1.Pek.Besi&Allm / HAL 203 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7
1x40.40.2mm, modul 60 x 120 cm, untuk partisi Dibulatkan : 140,200.00

galpanis 1x40.40.0.35mm, modul 60 x 120 cm, untuk partisi


77,000.00
11,000.00 38,500.00
38,500.00 38,500.00
62,216.00
137,445.00 34,361.25
89,320.00 22,330.00
157,850.00 3,946.25
157,850.00 1,578.50
Jumlah 139,216.00
Overhead & keuntungan 10% : 13,921.60
Jumlah : 153,137.60
galpanis 1x40.40.0.35mm, modul 60 x 120 cm, untuk part Dibulatkan : 153,100.00

A.4.2.1.Pek.Besi&Allm / HAL 204 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

55,203.98
60,573.33 34,526.80
60,573.33 13,459.39
111,026.67 4,219.01
30,213.33 966.83
83.60 2,031.95
62,216.00
137,445.00 34,361.25
89,320.00 22,330.00
157,850.00 3,946.25
157,850.00 1,578.50
Jumlah 117,419.98
Overhead & keuntungan 10% : 11,742.00
Jumlah : 129,161.98
Dibulatkan : 129,100.00

48,524.67
9,331.67 37,326.67
11,198.00 11,198.00
62,216.00
137,445.00 34,361.25
89,320.00 22,330.00
157,850.00 3,946.25
157,850.00 1,578.50
Jumlah 110,740.67
Overhead & keuntungan 10% : 11,074.07
Jumlah : 121,814.73
Dibulatkan : 121,800.00

galpanis 1x40.40.0,35mm, modul 60 x 120 cm, untuk plapond


88,000.00
11,000.00 44,000.00
44,000.00 44,000.00
62,216.00
137,445.00 34,361.25
89,320.00 22,330.00
157,850.00 3,946.25
157,850.00 1,578.50
Jumlah 150,216.00
Overhead & keuntungan 10% : 15,021.60
Jumlah : 165,237.60
galpanis 1x40.40.0,35mm, modul 60 x 120 cm, untuk pl Dibulatkan : 165,200.00

43,030.87
1,320.00 1,372.80
5,573.33 1,463.00
4,253.33 4,423.47
28,013.33 3,734.18
49,133.33 10,917.43
7,480.00 -
14,666.67 21,120.00
62,216.00
137,445.00 34,361.25
A.4.2.1.Pek.Besi&Allm / HAL 205 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7
89,320.00 22,330.00
157,850.00 3,946.25
157,850.00 1,578.50
Jumlah 105,246.87
Overhead & keuntungan 10% : 10,524.69
Jumlah : 115,771.56
Dibulatkan : 115,700.00

1,690,930.34
3,332,010.00 19,992.06
243,231.34 87,563.28
594,000.00 1,113,750.00
7,500.00 15,000.00
15,000.00 30,000.00
6,500.00 26,000.00
85,000.00 340,000.00
117,250.00 58,625.00
450,796.50
157,850.00 28,413.00
137,445.00 247,401.00
89,320.00 160,776.00
157,850.00 14,206.50

Jumlah 2,141,726.84
Overhead & keuntungan 10% : 214,172.68
Dibulatkan : 2,355,899.53
Dibulatkan : 2,355,800.00

A.4.2.1.Pek.Besi&Allm / HAL 206 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

230,384.00 253,422.40 794,018.45


166,628.00 162,462.30
67,760.00 271,040.00
7,500.00 15,000.00
15,000.00 30,000.00
6,500.00 26,000.00
48,125.00 36,093.75
300,531.00
157,850.00 18,942.00
137,445.00 164,934.00
89,320.00 107,184.00
157,850.00 9,471.00

Jumlah 1,094,549.45
Overhead & keuntungan 10% : 109,454.95
Jumlah : 1,204,004.40
Dibulatkan : 1,204,000.00

83,399.22 91,739.14 267,346.11


61,904.58 60,356.96
- -
7,500.00 15,000.00
12,000.00 24,000.00
6,500.00 26,000.00
67,000.00 50,250.00
255,451.35
157,850.00 16,100.70
137,445.00 140,193.90
89,320.00 91,106.40
157,850.00 8,050.35

Jumlah 522,797.46
Overhead & keuntungan 10% : 52,279.75
Jumlah : 575,077.20
258,160.00 216,030.87
Dibulatkan : 791,100.00

230,384.00 253,422.40 386,970.40


166,628.00 62,485.50
7,500.00 15,000.00
12,000.00 24,000.00
6,500.00 19,500.00
67,000.00 12,562.50
127,725.68
157,850.00 8,050.35
137,445.00 70,096.95
89,320.00 45,553.20
157,850.00 4,025.18

Jumlah 514,696.08
Overhead & keuntungan 10% : 51,469.61
Jumlah : 566,165.68

A.4.2.1.Pek.Besi&Allm / HAL 207 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7
Dibulatkan : 566,100.00

u berikut Accessories ( terpasang ) :


5,969,920.00 5,969,920.00

Jumlah 5,969,920.00
Overhead & keuntungan 10% : 596,992.00
Jumlah : 6,566,912.00
u berikut Accessories ( terpasang ) : Dibulatkan : 6,566,900.00

A.4.2.1.Pek.Besi&Allm / HAL 208 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

300,288.34
280,750.80 294,788.34
27,500.00 5,500.00
47,786.20
89,320.00 893.20
137,445.00 13,744.50
157,850.00 31,570.00
157,850.00 1,578.50
72,799.32
30,333.05 72,799.32
Jumlah 420,873.86
Overhead & keuntungan 10% : 42,087.39
Jumlah : 462,961.25
Dibulatkan : 462,900.00

297,000.00 311,850.00

1,006,830.00 1,057,171.50

100,000.00 100,000.00

45,000.00 45,000.00

Jumlah 1,514,021.50
Overhead & keuntungan 10% : 151,402.15
Jumlah : 1,665,423.65
Dibulatkan : 1,665,400.00

297,000.00 311,850.00 311,850.00

873,180.00 916,839.00 916,839.00

100,000.00 100,000.00 100,000.00

45,000.00 45,000.00 45,000.00

Jumlah 1,373,689.00
Overhead & keuntungan 10% : 137,368.90
Jumlah : 1,511,057.90
Dibulatkan : 1,511,000.00

21,150.00
16,500.00 18,150.00
A.4.2.1.Pek.Besi&Allm / HAL 209 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7
1,500.00 3,000.00
8,076.77
89,320.00 2,880.57
137,445.00 4,432.60
157,850.00 509.07
157,850.00 254.53
Jumlah 29,226.77
Overhead & keuntungan 10% : 2,922.68
Jumlah : 32,149.45
Dibulatkan : 32,100.00

1,160,897.61 542,719.63 575,719.63


6,500.00 16,250.00
67,000.00 16,750.00
374,543.40
89,320.00 10,718.40
137,445.00 164,934.00
157,850.00 189,420.00
157,850.00 9,471.00

Jumlah 950,263.03
Overhead & keuntungan 10% : 95,026.30
Jumlah : 1,045,289.34
Dibulatkan : 1,045,200.00

A.4.2.1.Pek.Besi&Allm / HAL 210 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

1,408,500.00 1,478,925.00 1,478,925.00


33,976.25
89,320.00 17,864.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 789.25

Jumlah 1,512,901.25
Overhead & keuntungan 10% : 151,290.13
Jumlah : 1,664,191.38
Dibulatkan : 1,664,100.00

281,050.00 309,155.00 Rp 309,155.00


Rp 62,610.63
89,320.00 22,330.00
137,445.00 34,361.25
157,850.00 3,946.25
157,850.00 1,973.13

Jumlah Rp 371,765.63
Overhead & keuntungan 10% : 37,176.56
Jumlah : Rp 408,942.19
Dibulatkan : Rp 408,900.00

54,890.00 60,379.00 Rp 60,379.00


Rp 37,566.38
89,320.00 13,398.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 1,183.88

Jumlah Rp 97,945.38
Overhead & keuntungan 10% : 9,794.54
Jumlah : Rp 107,739.91
Dibulatkan : Rp 107,700.00

1,382,304.00 2,303,840.00 Rp 3,253,730.00


999,768.00 833,140.00
12,000.00 48,000.00
6,500.00 52,000.00
67,000.00 16,750.00
Rp 150,926.55
89,320.00 50,019.20
137,445.00 7,696.92
157,850.00 88,396.00
157,850.00 4,814.43

Jumlah Rp 3,404,656.55
Overhead & keuntungan 10% : 340,465.65
Jumlah : Rp 3,745,122.20
Dibulatkan : Rp 3,745,100.00
A.4.2.1.Pek.Besi&Allm / HAL 211 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

236,485.70 10,688,680.67 Rp 28,503,576.06


142,581.14 1,988,151.47
52,160.34 6,324,649.75
170,280.00 340,560.00
75,000.00 900,000.00
11,782.61 136,138.85
11,782.61 74,349.97
93,808.63 375,234.50
234,694.90 7,675,810.86
Rp 4,128,895.97
89,320.00 1,473,279.81
137,445.00 2,267,072.81
157,850.00 260,364.10
157,850.00 128,179.25

Jumlah Rp 32,632,472.03
Overhead & keuntungan 10% : 3,263,247.20
Jumlah : Rp 35,895,719.24
Dibulatkan : Rp 35,895,700.00

A.4.2.1.Pek.Besi&Allm / HAL 212 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

13,824,800.00 13,824,800.00 Rp 13,824,800.00

Jumlah Rp 13,824,800.00
Overhead & keuntungan 10% : 1,382,480.00
Jumlah : Rp 15,207,280.00
Dibulatkan : Rp 15,207,200.00

17,131,400.00 17,131,400.00 Rp 17,131,400.00

Jumlah Rp 17,131,400.00
Overhead & keuntungan 10% : 1,713,140.00
Jumlah : Rp 18,844,540.00
Dibulatkan : Rp 18,844,500.00

sh cat anti karat, Hardware setara Griff

- - Rp -

Jumlah Rp -
Overhead & keuntungan 10% : -
Jumlah : Rp -
sh cat anti karat, Hardware setara Griff Dibulatkan : Rp -

sh cat anti karat, Hardware setara Griff

17,952,200.00 17,952,200.00 Rp 17,952,200.00

Jumlah Rp 17,952,200.00
Overhead & keuntungan 10% : 1,795,220.00
Jumlah : Rp 19,747,420.00
sh cat anti karat, Hardware setara Griff Dibulatkan : Rp 19,747,400.00

at anti karat, Hardware setara Griff, setara Bostinco

17,952,200.00 17,952,200.00 Rp 17,952,200.00

Jumlah Rp 17,952,200.00
Overhead & keuntungan 10% : 1,795,220.00
Jumlah : Rp 19,747,420.00
at anti karat, Hardware setara Griff, setara Bostinco Dibulatkan : Rp 19,747,400.00

le shaft steel door finish cat anti karat, Hardware setara Griff, setara Bostinco

6,560,400.00 6,560,400.00 Rp 6,560,400.00

Jumlah Rp 6,560,400.00
A.4.2.1.Pek.Besi&Allm / HAL 213 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7
Overhead & keuntungan 10% : 656,040.00
Jumlah : Rp 7,216,440.00
le shaft steel door finish cat anti karat, Hardware setara Dibulatkan : Rp 7,216,400.00

e shaft steel door finish cat anti karat, Hardware setara Griff, setara Bostinco

4,246,000.00 4,246,000.00 Rp 4,246,000.00

Jumlah Rp 4,246,000.00
Overhead & keuntungan 10% : 424,600.00
Jumlah : Rp 4,670,600.00
e shaft steel door finish cat anti karat, Hardware setara G Dibulatkan : Rp 4,670,600.00

83,399.22 1,794,417.67 2,946,784.15


52,160.34 688,516.47
12,000.00 168,000.00
6,500.00 182,000.00
30,360.00 113,850.00
876,548.75
89,320.00 312,620.00
137,445.00 481,057.50
157,850.00 55,247.50
157,850.00 27,623.75

Jumlah 3,823,332.90
Overhead & keuntungan 10% : 382,333.29
Jumlah : 4,205,666.19
258,160.00 1,716,314.60
Dibulatkan : 5,921,900.00

A.4.2.1.Pek.Besi&Allm / HAL 214 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

83,399.22 1,339,391.51 2,337,437.31


52,160.34 584,195.80
12,000.00 144,000.00
6,500.00 156,000.00
30,360.00 113,850.00
500,885.00
89,320.00 178,640.00
137,445.00 274,890.00
157,850.00 31,570.00
157,850.00 15,785.00

Jumlah 2,838,322.31
Overhead & keuntungan 10% : 283,832.23
Jumlah : 3,122,154.54
258,160.00 1,313,856.79
Dibulatkan : 4,436,000.00

494,830.36
15,510.00 294,936.92
13,310.00 112,123.44
30,360.00 22,770.00
6,500.00 65,000.00
375,663.75
89,320.00 133,980.00
137,445.00 206,167.50
157,850.00 23,677.50
157,850.00 11,838.75
Jumlah 870,494.11
Overhead & keuntungan 10% : 87,049.41
Jumlah : 957,543.52
258,160.00 185,875.20
Dibulatkan : 1,143,400.00

192,000.00
24,000.00 96,000.00
96,000.00 96,000.00
62,216.00
137,445.00 34,361.25
89,320.00 22,330.00
157,850.00 3,946.25
157,850.00 1,578.50
Jumlah 254,216.00
Overhead & keuntungan 10% : 25,421.60
Jumlah : 279,637.60
1x50x50.2mm, modul 100 x 100 cm Dibulatkan : 279,600.00

0x80x3,8 dan 20x80x2,2mm finish cat duco (Modul 2.40mx2.80m)


26,082,367.12
33,300.00 1,317,481.20
38,300.00 183,840.00
57,200.00 16,595,779.20
75,400.00 2,159,214.72
1,990.00 361,321.12
258,160.00 5,464,730.88
A.4.2.1.Pek.Besi&Allm / HAL 215 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Jumlah Harga per modul 2.4mx2.8m : 26,082,367.12


Jumlah Harga per m2 : 3,881,304.63
20x80x3,8 dan 20x80x2,2mm finish cat duco Dibulatkan : 3,881,300.00

gle shaft steel door finish cat anti karat, Hardware setara Griff, setara Bostinco

2,547,600.00 2,547,600.00 Rp 2,547,600.00

Jumlah Rp 2,547,600.00
Overhead & keuntungan 10% : 254,760.00
Jumlah : Rp 2,802,360.00
gle shaft steel door finish cat anti karat, Hardware setara Dibulatkan : Rp 2,802,300.00

50.50.2mm, modul 60 x 120 cm, untuk atap


211,411.20
40,656.00 162,624.00
48,787.20 48,787.20
62,216.00
137,445.00 34,361.25
89,320.00 22,330.00
157,850.00 3,946.25
157,850.00 1,578.50
Jumlah 273,627.20
Overhead & keuntungan 10% : 27,362.72
Jumlah : 300,989.92

A.4.2.1.Pek.Besi&Allm / HAL 216 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

230,384.00 253,422.40 498,746.55


230,384.00 138,230.40
7,500.00 15,000.00
15,000.00 30,000.00
6,500.00 26,000.00
48,125.00 36,093.75
300,531.00
157,850.00 18,942.00
137,445.00 164,934.00
89,320.00 107,184.00
157,850.00 9,471.00

Jumlah 799,277.55
Overhead & keuntungan 10% : 79,927.76
Jumlah : 879,205.31
Dibulatkan : 879,200.00

48,524.67
9,331.67 37,326.67
11,198.00 11,198.00
62,216.00
137,445.00 34,361.25
89,320.00 22,330.00
157,850.00 3,946.25
157,850.00 1,578.50
Jumlah 110,740.67
Overhead & keuntungan 10% : 11,074.07
Jumlah : 121,814.73
Dibulatkan : 121,800.00
Dibulatkan : 54,810.00

A.4.2.1.Pek.Besi&Allm / HAL 217 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 2 3
A.4.4.1 PEKERJAAN DINDING
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan

2 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran


Bahan
Bata Merah kelas 1 140.000 Buah
PC 32.950 kg
PP 0.091 m³
Tenaga Kerja
Pekerja 0.600 org/hr
Tukang Batu 0.200 org/hr
Kepala Tukang 0.020 org/hr
Mandor 0.030 org/hr

2 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran

4 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran

Bahan
Bata Merah kelas 1 140.000 Buah
PC 22.200 kg
PP 0.102 m³
Tenaga Kerja
Pekerja 0.600 org/hr
Tukang Batu 0.200 org/hr
Kepala Tukang 0.020 org/hr
Mandor 0.030 org/hr

4 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran

8 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campura
Bahan
Bata Merah kelas 1 70.000 Buah
PC 14.370 kg
PP 0.040 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.015 org/hr

8 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campura

10 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campura
Bahan
Bata Merah kelas 1 70.000 Buah
PC 9.680 kg
PP 0.045 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.100 org/hr

A.4.4.1.Pek.Dinding / HAL 218 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 2 3
Kepala Tukang 0.010 org/hr
Mandor 0.015 org/hr

10 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campura

11a 1 m² Pasangan Dinding Batako. Campuran Spesi 1PC : 4PP


Bahan
Batako 11.000 Buah
PC 3.450 kg
PP 0.013 m³
Tenaga Kerja
Pekerja 0.150 org/hr
Tukang Batu 0.050 org/hr
Kepala Tukang 0.005 org/hr
Mandor 0.005 org/hr

11a 1 m² Pasangan Dinding Batako. Campuran Spesi 1PC : 4PP

A.4.4.1.Pek.Dinding / HAL 219 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 2 3

23 1 m² Pasangan Dinding Terawang (Roster beton) Uk.(12x11x24)cm.Campuran Spesi 1


Bahan
Terawang (Roster) 30.000 Buah
PC 11.000 kg
PP 0.035 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.015 org/hr

23 1 m² Pasangan Dinding Terawang (Roster beton) Uk.(12x11x24)cm.Campuran Spesi 1

25 1 m2 Pasangan Dinding Bata ringan tebal 7.5cm dengan mortar siap pakai
Bahan
Bata ringan 0.084 m3
Sement / mortal 4.612 kg
Tenaga Kerja
Pekerja 0.210 org/hr
Tukang Batu 0.090 org/hr
Kepala Tukang 0.009 org/hr
Mandor 0.009 org/hr

25 1 m2 Pasangan Dinding Bata ringan tebal 7.5cm dengan mortar siap pakai

26 1 m2 Pasangan Dinding Bata ringan tebal 10cm dengan mortar siap pakai
. Bahan
Bata ringan setara Hebel 0.110 m3
Sement / mortal 4.612 kg
Tenaga Kerja
Pekerja 0.350 org/hr
Tukang Batu 0.150 org/hr
Kepala Tukang 0.015 org/hr
Mandor 0.015 org/hr

26 1 m2 Pasangan Dinding Bata ringan tebal 10cm dengan mortar siap pakai

27 1 m3 Pasangan Dinding Bata ringan tebal 15cm dengan mortar siap pakai
Bahan
Bata ringan 0.165 m2
Sement / mortal 5.333 kg
Tenaga Kerja
Pekerja 0.350 org/hr
Tukang Batu 0.150 org/hr
Kepala Tukang 0.015 org/hr
Mandor 0.015 org/hr

27 1 m3 Pasangan Dinding Bata ringan tebal 15cm dengan mortar siap pakai

A.4.4.1.Pek.Dinding / HAL 220 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 2 3
28 1 m² Panel Dinding fasade ex. Hebel
Bahan
Super panel dinding fasade t= 100mm ex. Hebel 1.100 m2
Sement / mortal 4.000 kg
alat bantu 1.000 lot
Tenaga Kerja
Pekerja 0.350 org/hr
Tukang Batu 0.150 org/hr
Kepala Tukang 0.015 org/hr
Mandor 0.015 org/hr

28 1 m² Panel Dinding fasade ex. Hebel

A.4.4.1.Pek.Dinding / HAL 221 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
4 5 6

kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1PC : 3PP


308,427.46
990.00 138,600.00
4,971.52 163,811.45
66,110.00 6,016.01
88,973.50
89,320.00 53,592.00
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 4,735.50
Jumlah : 397,400.96
Overhead & keuntungan 10% : 39,740.10
Jumlah : 437,141.06
kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1 Dibulatkan : 437,100.00

kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1PC : 5PP

255,710.88
990.00 138,600.00
4,971.52 110,367.66
66,110.00 6,743.22
88,973.50
89,320.00 53,592.00
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 4,735.50
Jumlah : 344,684.38
Overhead & keuntungan 10% : 34,468.44
Jumlah : 379,152.81
kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1 Dibulatkan : 379,100.00

kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi 1PC : 3PP


208,516.88
990.00 69,300.00
9,504.00 136,572.48
66,110.00 2,644.40
44,486.75
89,320.00 26,796.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 2,367.75
Jumlah : 253,003.63
Overhead & keuntungan 10% : 25,300.36
Jumlah : 278,303.99
kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi Dibulatkan : 278,300.00

kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi 1PC : 5PP


89,311.75
990.00 69,300.00
1,760.00 17,036.80
66,110.00 2,974.95
44,486.75
89,320.00 26,796.00
137,445.00 13,744.50

A.4.4.1.Pek.Dinding / HAL 222 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
4 5 6
157,850.00 1,578.50
157,850.00 2,367.75
Jumlah : 133,798.50
Overhead & keuntungan 10% : 13,379.85
Jumlah : 147,178.35
kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi Dibulatkan : 147,100.00

34,424.82
2,500.00 27,500.00
1,760.00 6,072.00
66,110.00 852.82
21,848.75
89,320.00 13,398.00
137,445.00 6,872.25
157,850.00 789.25
157,850.00 789.25
Jumlah : 56,273.57
Overhead & keuntungan 10% : 5,627.36
Jumlah : 61,900.93
Dibulatkan : 61,900.00

A.4.4.1.Pek.Dinding / HAL 223 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
4 5 6

Roster beton) Uk.(12x11x24)cm.Campuran Spesi 1PC : 4PP


111,673.85
3,000.00 90,000.00
1,760.00 19,360.00
66,110.00 2,313.85
44,486.75
89,320.00 26,796.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 2,367.75
Jumlah : 156,160.60
Overhead & keuntungan 10% : 15,616.06
Jumlah : 171,776.66
Roster beton) Uk.(12x11x24)cm.Campuran Spesi 1PC : 4 Dibulatkan : 171,700.00

tebal 7.5cm dengan mortar siap pakai


177,502.43
1,929,824.56 162,105.26
3,338.50 15,397.16
33,968.55
89,320.00 18,757.20
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 1,420.65
Jumlah : 211,470.98
Overhead & keuntungan 10% : 21,147.10
Jumlah : 232,618.07
tebal 7.5cm dengan mortar siap pakai Dibulatkan harga per m3 : 232,610.00

227,677.86
1,929,824.56 212,280.70
3,338.50 15,397.16
56,614.25
89,320.00 31,262.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 2,367.75
Jumlah : 284,292.11
Overhead & keuntungan 10% : 28,429.21
Jumlah : 312,721.33
Dibulatkan : 312,720.00

336,226.39
1,929,824.56 318,421.05
3,338.50 17,805.33
56,614.25
89,320.00 31,262.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 2,367.75
Jumlah : 392,840.64
Overhead & keuntungan 10% : 39,284.06
Jumlah : 432,124.70
Dibulatkan : 432,100.00

A.4.4.1.Pek.Dinding / HAL 224 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
4 5 6

334,129.40
264,000.00 290,400.00
3,338.50 13,354.00
30,375.40 30,375.40
56,614.25
89,320.00 31,262.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 2,367.75
Jumlah : 390,743.65
Overhead & keuntungan 10% : 39,074.37
Jumlah : 429,818.02
Dibulatkan : 429,800.00

A.4.4.1.Pek.Dinding / HAL 225 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN
1 2 2 3
A.4.4.2 PEKERJAAN PLESTERAN
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
1 1 m² Plesteran 1 : 1 Tebal 15 mm
Bahan
Portland Cement 15.504 Kg
Pasir Pasang 0.016 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.150 org/hr
Kepala Tukang 0.015 org/hr
Mandor 0.015 org/hr

1 1 m² Plesteran 1 : 1 Tebal 15 mm

2 1 m² Plesteran 1 : 2 Tebal 15 mm
Bahan
Portland Cement 10.224 Kg
Pasir Pasang 0.020 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.150 org/hr
Kepala Tukang 0.015 org/hr
Mandor 0.015 org/hr

2 1 m² Plesteran 1 : 2 Tebal 15 mm

3 1 m² Plesteran 1 : 3 Tebal 15 mm
Bahan
Portland Cement 7.776 Kg
Pasir Pasang 0.023 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.150 org/hr
Kepala Tukang 0.015 org/hr
Mandor 0.015 org/hr

3 1 m² Plesteran 1 : 3 Tebal 15 mm

4 1 m² Plesteran 1 : 4 Tebal 15 mm
Bahan
Portland Cement 6.240 Kg
Pasir Pasang 0.024 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.150 org/hr
Kepala Tukang 0.015 org/hr
Mandor 0.015 org/hr

4 1 m² Plesteran 1 : 4 Tebal 15 mm
A.4.4.2.Pek.Plesteran / HAL 226 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN
1 2 2 3

5 1 m² Plesteran 1 : 5 Tebal 15 mm
Bahan
Portland Cement 5.184 Kg
Pasir Pasang 0.026 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.150 org/hr
Kepala Tukang 0.015 org/hr
Mandor 0.015 org/hr

5 1 m² Plesteran 1 : 5 Tebal 15 mm

13 1 m² Plesteran 1 : 2 Tebal 20 mm
Bahan
Portland Cement 13.632 Kg
Pasir Pasang 0.027 m³
Tenaga Kerja
Pekerja 0.400 org/hr
Tukang Batu 0.200 org/hr
Kepala Tukang 0.020 org/hr
Mandor 0.022 org/hr

13 1 m² Plesteran 1 : 2 Tebal 20 mm

A.4.4.2.Pek.Plesteran / HAL 227 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN
1 2 2 3
14 1 m² Plesteran 1 : 3 Tebal 20 mm
Bahan
Portland Cement 10.368 Kg
Pasir Pasang 0.031 m³
Tenaga Kerja
Pekerja 0.400 org/hr
Tukang Batu 0.200 org/hr
Kepala Tukang 0.020 org/hr
Mandor 0.022 org/hr

14 1 m² Plesteran 1 : 3 Tebal 20 mm

15 1 m² Plesteran 1 : 4 Tebal 20 mm
Bahan
Portland Cement 8.320 Kg
Pasir Pasang 0.032 m³
Tenaga Kerja
Pekerja 0.400 org/hr
Tukang Batu 0.200 org/hr
Kepala Tukang 0.020 org/hr
Mandor 0.022 org/hr

15 1 m² Plesteran 1 : 4 Tebal 20 mm

16 1 m² Plesteran 1 : 5 Tebal 20 mm
Bahan
Portland Cement 6.912 Kg
Pasir Pasang 0.035 m³
Tenaga Kerja
Pekerja 0.400 org/hr
Tukang Batu 0.200 org/hr
Kepala Tukang 0.020 org/hr
Mandor 0.022 org/hr

16 1 m² Plesteran 1 : 5 Tebal 20 mm

20 1 m² Plesteran skoneng 1 : 2 Lebar 10 mm


Bahan
Portland Cement 0.500 Kg
Pasir Pasang 0.013 m³
Tenaga Kerja
Pekerja 0.080 org/hr
Tukang Batu 0.400 org/hr
Kepala Tukang 0.040 org/hr
Mandor 0.004 org/hr

20 1 m² Plesteran skoneng 1 : 2 Lebar 10 mm

23 1 m² Plesteran Ciprat 1 : 2 Kamprot

A.4.4.2.Pek.Plesteran / HAL 228 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN
1 2 2 3
Bahan
Portland Cement 4.320 Kg
Pasir Pasang 0.006 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.015 org/hr

23 1 m² Plesteran Ciprat 1 : 2 Kamprot

24 1 m² Finishing Siar Pasangan Dinding Bata Merah ( 20 m' )


Bahan
Portland Cement 3.108 Kg
Tenaga Kerja
Pekerja 0.150 org/hr
Tukang Batu 0.075 org/hr
Kepala Tukang 0.008 org/hr
Mandor 0.008 org/hr

24 1 m² Finishing Siar Pasangan Dinding Bata Merah ( 20 m' )

A.4.4.2.Pek.Plesteran / HAL 229 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN
1 2 2 3
25 1 m² Finishing Siar Pasangan Dinding Conblock Ekspose ( 8 m' )
Bahan
Portland Cement 1.600 Kg
Tenaga Kerja
Pekerja 0.070 org/hr
Tukang Batu 0.035 org/hr
Kepala Tukang 0.004 org/hr
Mandor 0.004 org/hr

25 1 m² Finishing Siar Pasangan Dinding Conblock Ekspose ( 8 m' )

26 1 m² Finishing Siar Pasangan Batu Kali Adukan 1 : 2


Bahan
Portland Cement 6.340 Kg
Pasir Pasang 0.012 m³
Tenaga Kerja
Pekerja 0.300 org/hr
Tukang Batu 0.150 org/hr
Kepala Tukang 0.015 org/hr
Mandor 0.015 org/hr

26 1 m² Finishing Siar Pasangan Batu Kali Adukan 1 : 2

27 1 m² Finishing Acian
Bahan
Portland Cement 3.250 Kg
Tenaga Kerja
Pekerja 0.200 org/hr
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.010 org/hr

27 1 m² Finishing Acian

28 1 m² Flesteran + Acian (Pakai perekat jenis mortar)


Bahan
Sement / mortal ( PM -302) untuk plesteran 19.048 Kg
Sement / mortal ( PM -2020) untuk acian 2.000 Kg
Tenaga Kerja
Pekerja 0.250 org/hr
Tukang Batu 0.125 org/hr
Kepala Tukang 0.013 org/hr
Mandor 0.006 org/hr

28 1 m² Flesteran + Acian (Pakai perekat jenis mortar)

29 1 m² Finish Trowel
Bahan

Tenaga Kerja
A.4.4.2.Pek.Plesteran / HAL 230 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN
1 2 2 3
Pekerja 0.050 org/hr
Tukang Batu 0.025 org/hr
Kepala Tukang 0.003 org/hr
Mandor 0.003 org/hr

29 1 m² Finish Trowel

A.4.4.2.Pek.Plesteran / HAL 231 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
4.00 5.00 6.00

23,306.59
1,322.20 20,499.39
175,450.00 2,807.20
49,712.25
81,200.00 24,360.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 2,367.75
Jumlah 73,018.84
Overhead & keuntungan 10% : 7,301.88
Jumlah : 80,320.72
Dibulatkan : 80,300.00

17,027.17
1,322.20 13,518.17
175,450.00 3,509.00
49,712.25
81,200.00 24,360.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 2,367.75
Jumlah 66,739.42
Overhead & keuntungan 10% : 6,673.94
Jumlah : 73,413.37
Dibulatkan : 73,400.00

14,316.78
1,322.20 10,281.43
175,450.00 4,035.35
49,712.25
81,200.00 24,360.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 2,367.75
Jumlah 64,029.03
Overhead & keuntungan 10% : 6,402.90
Jumlah : 70,431.93
Dibulatkan : 70,400.00

12,461.33
1,322.20 8,250.53
175,450.00 4,210.80
49,712.25
81,200.00 24,360.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 2,367.75
Jumlah 62,173.58
Overhead & keuntungan 10% : 6,217.36
Jumlah : 68,390.94
Dibulatkan : 68,300.00
A.4.4.2.Pek.Plesteran / HAL 232 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
4.00 5.00 6.00

11,415.98
1,322.20 6,854.28
175,450.00 4,561.70
49,712.25
81,200.00 24,360.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 2,367.75
Jumlah 61,128.23
Overhead & keuntungan 10% : 6,112.82
Jumlah : 67,241.06
Dibulatkan : 67,200.00

22,761.38
1,322.20 18,024.23
175,450.00 4,737.15
66,598.70
81,200.00 32,480.00
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 3,472.70
Jumlah 89,360.08
Overhead & keuntungan 10% : 8,936.01
Jumlah : 98,296.09
Dibulatkan : 98,200.00

A.4.4.2.Pek.Plesteran / HAL 233 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
4.00 5.00 6.00

19,147.52
1,322.20 13,708.57
175,450.00 5,438.95
66,598.70
81,200.00 32,480.00
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 3,472.70
Jumlah 85,746.22
Overhead & keuntungan 10% : 8,574.62
Jumlah : 94,320.84
Dibulatkan : 94,300.00

16,615.10
1,322.20 11,000.70
175,450.00 5,614.40
66,598.70
81,200.00 32,480.00
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 3,472.70
Jumlah 83,213.80
Overhead & keuntungan 10% : 8,321.38
Jumlah : 91,535.18
Dibulatkan : 91,500.00

15,279.80
1,322.20 9,139.05
175,450.00 6,140.75
66,598.70
81,200.00 32,480.00
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 3,472.70
Jumlah 81,878.50
Overhead & keuntungan 10% : 8,187.85
Jumlah : 90,066.35
Dibulatkan : 90,000.00

2,941.95
1,322.20 661.10
175,450.00 2,280.85
68,419.40
81,200.00 6,496.00
137,445.00 54,978.00
157,850.00 6,314.00
157,850.00 631.40
Jumlah 71,361.35
Overhead & keuntungan 10% : 7,136.14
Jumlah : 78,497.49
Dibulatkan : 78,400.00

A.4.4.2.Pek.Plesteran / HAL 234 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
4.00 5.00 6.00
6,764.60
1,322.20 5,711.90
175,450.00 1,052.70
42,050.75
81,200.00 24,360.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 2,367.75
Jumlah 48,815.35
Overhead & keuntungan 10% : 4,881.54
Jumlah : 53,696.89
Dibulatkan : 53,600.00

4,109.40
1,322.20 4,109.40
25,013.98
81,200.00 12,180.00
137,445.00 10,308.38
157,850.00 1,262.80
157,850.00 1,262.80
Jumlah 29,123.37
Overhead & keuntungan 10% : 2,912.34
Jumlah : 32,035.71
Dibulatkan : 32,000.00

A.4.4.2.Pek.Plesteran / HAL 235 DARI 616


HARGA STUAN SUB. JUMLAH JUMLAH
4.00 5.00 6.00

2,115.52
1,322.20 2,115.52
11,757.38
81,200.00 5,684.00
137,445.00 4,810.58
157,850.00 631.40
157,850.00 631.40
Jumlah 13,872.90
Overhead & keuntungan 10% : 1,387.29
Jumlah : 15,260.18
Dibulatkan : 15,200.00

10,488.15
1,322.20 8,382.75
175,450.00 2,105.40
49,712.25
81,200.00 24,360.00
137,445.00 20,616.75
157,850.00 2,367.75
157,850.00 2,367.75
Jumlah 60,200.40
Overhead & keuntungan 10% : 6,020.04
Jumlah : 66,220.44
Dibulatkan : 66,200.00

4,297.15
1,322.20 4,297.15
33,141.50
81,200.00 16,240.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 1,578.50
Jumlah 37,438.65
Overhead & keuntungan 10% : 3,743.87
Jumlah : 41,182.52
Dibulatkan : 41,100.00

49,122.86
2,186.25 41,642.86
3,740.00 7,480.00
40,440.31
81,200.00 20,300.00
137,445.00 17,180.63
157,850.00 1,973.13
157,850.00 986.56
Jumlah 89,563.17
Overhead & keuntungan 10% : 8,956.32
Jumlah : 98,519.49
Dibulatkan : 98,500.00

8,285.38
A.4.4.2.Pek.Plesteran / HAL 236 DARI 616
HARGA STUAN SUB. JUMLAH JUMLAH
4.00 5.00 6.00
81,200.00 4,060.00
137,445.00 3,436.13
157,850.00 394.63
157,850.00 394.63
Jumlah 8,285.38
Overhead & keuntungan 10% : 828.54
Jumlah : 9,113.91
Dibulatkan : 9,100.00

A.4.4.2.Pek.Plesteran / HAL 237 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
A.4.4.3 PEKERJAAN PENUTUP DINDING & LANTAI
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
34 1 m² Pasang Lantai keramik Ukuran (33 x 33)cm polished setara Roman Gol. A
Bahan
Keramik uk. 33x33cm Polished/Glazed setara Roman 1.050 M2
PC 8.190 kg
PP 0.045 M³
Semen Warna 0.500 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

34 1 m² Pasang Lantai keramik Ukuran (33 x 33)cm polished setara Roman Gol. A

34a 1 m² Pasang Lantai keramik Ukuran (33 x 33)cm unpolished setara Roman Gol. C
Bahan
Keramik uk. 33x33cm Unpolished/Anti slip setara Roman 1.050 M2
PC 8.190 kg
PP 0.045 M³
Semen Warna 0.500 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

34a 1 m² Pasang Lantai keramik Ukuran (33 x 33)cm unpolished setara Roman Gol. C

35 1 m² Pasang Lantai Keramik Ukuran (30 x 30)cm polished setara Roman Gol. A
Bahan
Keramik uk. 30x30cm Polished/Glazed setara Roman 1.050 M2
PC 10.000 kg
PP 0.045 M³
Semen Warna 0.500 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

35 1 m² Pasang Lantai Keramik Ukuran (30 x 30)cm polished setara Roman Gol. A
35a 1 m² Pasang Lantai Keramik Ukuran (30 x 30) cm Unpolished/Anti slip setara Roman Gol. B
Bahan
Keramik uk. 30x30cm Unpolished/Anti slip 1.068 M2
PC 10.000 kg
PP 0.045 M³
Semen Warna 1.500 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
A.4.4.3.Pek.Penutup lt&Ddg / HAL 238 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

35a 1 m² Pasang Lantai Keramik Ukuran (30 x 30) cm Unpolished/Anti slip setara Roman Gol. B
36 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm setara Roman Gol. A
Bahan
Keramik uk. 20x20cm 1.050 m2
PC 10.400 kg
PP 0.045 M³
Semen Warna 0.500 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm setara Roman Gol. A

A.4.4.3.Pek.Penutup lt&Ddg / HAL 239 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
36a 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm anti slip setara Roman Gol. B
Bahan
Keramik uk. 20x20cm anti slip 1.050 m2
PC 10.400 kg
PP 0.045 M³
Semen Warna 0.500 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36a 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm anti slip setara Roman Gol. B

A.4.4.3.Pek.Penutup lt&Ddg / HAL 240 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

36a 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm Unpolised setara Roman Gol. B
Bahan
Keramik uk. 20x20cm Unpolised setara Roman Gol. B 1.050 m2
PC 10.400 kg
PP 0.045 M³
Semen Warna 0.500 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36a 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm Unpolised setara Roman Gol. B

36b 1 m² Pasang Lantai keramik Ukuran (40 x 40) cm Polised Setara Roman Gol. A
Bahan
Keramik lantai 40 x 40 type Polised Gol. A 1.040 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.300 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36b 1 m² Pasang Lantai keramik Ukuran (40 x 40) cm Polised Setara Roman Gol. A

36c 1 m² Pasang Lantai keramik Ukuran (40 x 40) cm Unpolised Setara Roman Gol. B
Bahan
Keramik lantai 40 x 40 type Unpolised Gol. B 1.040 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.300 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36c 1 m² Pasang Lantai keramik Ukuran (40 x 40) cm Unpolised Setara Roman Gol. B
36d 1 m² Pasang Lantai keramik Ukuran (50 x 50) cm Polised Setara Roman Gol. A
Bahan
Keramik lantai 50 x 50 type Polised Gol. A 1.080 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.300 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
A.4.4.3.Pek.Penutup lt&Ddg / HAL 241 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Mandor 0.035 0rg/hr

36d 1 m² Pasang Lantai keramik Ukuran (50 x 50) cm Polised Setara Roman Gol. A
36e 1 m² Pasang Lantai keramik Ukuran (60 x 60) cm Unpolised Setara Roman Gol. B
Bahan
Keramik lantai 50 x 50 type Unpolised Gol. B 1.080 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.300 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36e 1 m² Pasang Lantai keramik Ukuran (60 x 60) cm Unpolised Setara Roman Gol. B

A.4.4.3.Pek.Penutup lt&Ddg / HAL 242 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

36f 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Bermotif
Bahan
Homogeneus 600 x 600 type Polished BERMOTIF 1.080 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.300 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36f 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Bermotif

36g 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Matte Bermotif
Bahan
Homogeneus 600 x 600 type Matte BERMOTIF 1.080 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.300 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36g 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Matte Bermotif
36h 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Polos
Bahan
Homogeneus 600 x 600 type Polished POLOS 1.080 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.300 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36h 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Polos
36i 1 m² Pasang Lantai Homogenous Ukuran (40 x 60) cm setara Niro Granit
Bahan
Homogeneus 400 x 800 type Polished 1.020 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.200 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
A.4.4.3.Pek.Penutup lt&Ddg / HAL 243 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Mandor 0.035 0rg/hr

36i 1 m² Pasang Lantai Homogenous Ukuran (40 x 60) cm setara Niro Granit

36j 1 m² Pasang Lantai Homogenous Ukuran (60 x 120) cm setara Niro Granit
Bahan
Homogeneus 600 x 1200 type Matte 1.080 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.200 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36j 1 m² Pasang Lantai Homogenous Ukuran (60 x 120) cm setara Niro Granit

A.4.4.3.Pek.Penutup lt&Ddg / HAL 244 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
36k 1 m² Pasang Lantai Homogenous Ukuran (20 x 120) cm setara Niro Granit
Bahan
Homogeneus 200 x 1200 type Matte 1.080 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.200 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

36k 1 m² Pasang Lantai Homogenous Ukuran (20 x 120) cm setara Niro Granit

37 1 m² Pasang Lantai Keramik Ukuran (10 x 33) cm. polished setara Roman Gol. A
Bahan
Keramik uk. 10x33cm 33.000 m2
PC 9.800 kg
PP 0.045 M³
Semen Warna 4.370 kg
Tenaga Kerja
Pekerja 1.050 0rg/hr
Tukang Batu 0.525 0rg/hr
Kepala Tukang 0.053 0rg/hr
Mandor 0.053 0rg/hr

37 1 m² Pasang Lantai Keramik Ukuran (10 x 33) cm. polished setara Roman Gol. A
39 1 m' Pasang Plint Keramik Ukuran (10 x 20) cm polished setara Roman Gol. A
Bahan
Plint Keramik Artistik 5.300 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr

39 1 m' Pasang Plint Keramik Ukuran (10 x 20) cm polished setara Roman Gol. A
39a 1 m' Pasang Plint Keramik Ukuran (10 x 30) cm polished setara Roman Gol. A
Bahan
Plint Keramik 10 x 30 3.333 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr
A.4.4.3.Pek.Penutup lt&Ddg / HAL 245 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

39a 1 m' Pasang Plint Keramik Ukuran (10 x 30) cm polished setara Roman Gol. A

A.4.4.3.Pek.Penutup lt&Ddg / HAL 246 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
39b 1 m' Pasang Plint Keramik Ukuran (10 x 40) cm polished setara Roman Gol. A
Bahan
Plint Keramik 10 x 40 2.500 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr

39b 1 m' Pasang Plint Keramik Ukuran (10 x 40) cm polished setara Roman Gol. A
39c 1 m' Pasang Plint Keramik Ukuran (10 x 50) cm polished setara Roman Gol. A
Bahan
Plint Keramik 10 x 50 polished setara Roman Gol. A 1.667 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr

39c 1 m' Pasang Plint Keramik Ukuran (10 x 50) cm polished setara Roman Gol. A

39d 1 m' Pasang Plint Homogeneus Ukuran (10 x 40) cm


Bahan
Plint Homogeneus 10 x 40 2.500 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr

39d 1 m' Pasang Plint Homogeneus Ukuran (10 x 40) cm

39e 1 m' Pasang Plint Homogeneus Ukuran (10 x 60) cm


Bahan
Plint Homogeneus 10 x 60 1.667 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr
A.4.4.3.Pek.Penutup lt&Ddg / HAL 247 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

39e 1 m' Pasang Plint Homogeneus Ukuran (10 x 60) cm


43 1 m2 Pasang lantai Marmer slab cream Malaga Premium C1 Setara ex. Ujung Pandang
Bahan
Marmer slab Ujungpandang 1.060 M2
PC 8.190 kg
PP 0.045 M³
Semen Warna 0.134 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

43 1 m2 Pasang lantai Marmer slab cream Malaga Premium C1 Setara ex. Ujung Pandang

A.4.4.3.Pek.Penutup lt&Ddg / HAL 248 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
43a 1 m2 Pasang lantai Marmer Ukuran (60x60) cm Polised Setara ex. Ujung Pandang
Bahan
Marmer 60 x 60 type Polised 1.060 M2
PC 8.190 kg
PP 0.045 M³
Semen Warna 0.134 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

43a 1 m2 Pasang lantai Marmer Ukuran (60x60) cm Polised Setara ex. Ujung Pandang
43b 1 m2 Pasang lantai Granit macam-macam corakslab setara India
Bahan
Granit macam-macam corak slab Luar Negeri (Nero India) 1.060 M2
PC 8.190 kg
PP 0.045 M³
Semen Warna 0.650 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

43b 1 m2 Pasang lantai Granit macam-macam corakslab setara India


43c 1 m² Pasang Lantai Homogenous Ukuran (100 x 100) cm polished Setara Niro granit
Bahan
Homogeneus 1000 x 1000 type Polished 1.050 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.300 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

43c 1 m² Pasang Lantai Homogenous Ukuran (100 x 100) cm polished Setara Niro granit
43d 1 m² Pasang Lantai Homogenous Ukuran (100 x 100) cm matte setara Niro Granit
Bahan
Homogeneus 1000 x 1000 type Polished matte 1.050 M2
PC 9.800 kg
PP 0.045 M³
Semen Warna 1.300 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
A.4.4.3.Pek.Penutup lt&Ddg / HAL 249 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Mandor 0.035 0rg/hr

43d 1 m² Pasang Lantai Homogenous Ukuran (100 x 100) cm matte setara Niro Granit
44 1 m² Pasang lantai karpet Heavy Duty
Bahan
Floc Carpet Heavy Duty 1.050 M²
Lem 0.350 kg
Tenaga Kerja
Pekerja 0.170 0rg/hr
Tukang 0.170 0rg/hr
Kepala Tukang 0.017 0rg/hr
Mandor 0.009 0rg/hr

44 1 m² Pasang lantai karpet Heavy Duty

A.4.4.3.Pek.Penutup lt&Ddg / HAL 250 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

44a 1 m² Pasang Carpet tile 100% nylon


Bahan
Carpet tile 100% nylon 1.050 M²
Lem 0.350 kg
Tenaga Kerja
Pekerja 0.170 0rg/hr
Tukang 0.170 0rg/hr
Kepala Tukang 0.017 0rg/hr
Mandor 0.009 0rg/hr

44a 1 m² Pasang Carpet tile 100% nylon

45 1 m² Pasang underlayer / Pelapis bawah karpet


Bahan
Underlayer / rubber corrugated 1.050 M²
Lem 0.350 kg
Tenaga Kerja
Pekerja 0.120 0rg/hr
Tukang 0.120 0rg/hr
Kepala Tukang 0.012 0rg/hr
Mandor 0.006 0rg/hr

45 1 m² Pasang underlayer / Pelapis bawah karpet

46 1 m² Pasang Lantai Parquet kayu Jati


Bahan
Lantai parquet kayu jati 1.050 M²
Lem 0.600 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

46 1 m² Pasang Lantai Parquet kayu Jati


47 1 m² Pasang Lantai kayu ( Gym floor )
Bahan
Gym floor 1.050 M²
Lem 0.600 kg
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

47 1 m² Pasang Lantai kayu ( Gym floor )


54 1 m² Pasang Dinding Keramik Ukuran (20 x 20) cm polished setara Roman Gol. A
Bahan
Keramik Dinding 20 x 20 Gol. A 1.060 M2
A.4.4.3.Pek.Penutup lt&Ddg / HAL 251 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
PC 9.300 kg
PP 0.045 M³
Semen Warna 1.940 kg
Tenaga Kerja
Pekerja 0.900 0rg/hr
Tukang Batu 0.450 0rg/hr
Kepala Tukang 0.045 0rg/hr
Mandor 0.045 0rg/hr

54 1 m² Pasang Dinding Keramik Ukuran (20 x 20) cm polished setara Roman Gol. A

A.4.4.3.Pek.Penutup lt&Ddg / HAL 252 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
54a 1 m² Pasang Dinding Keramik Ukuran (20 x 25) cm polished setara Roman Gol. A
Bahan
Keramik Dinding 20 x 25 Gol. A 1.050 M2
PC 9.300 kg
PP 0.045 M³
Semen Warna 1.940 kg
Tenaga Kerja
Pekerja 0.900 0rg/hr
Tukang Batu 0.450 0rg/hr
Kepala Tukang 0.045 0rg/hr
Mandor 0.045 0rg/hr

54a 1 m² Pasang Dinding Keramik Ukuran (20 x 25) cm polished setara Roman Gol. A
54b 1 m² Pasang Dinding Keramik Ukuran (30 x 60) cm polished setara Roman Gol. A
Bahan
Keramik dinding 30 x 60 Gol. A 1.050 M2
PC 9.300 kg
PP 0.045 M³
Semen Warna 1.940 kg
Tenaga Kerja
Pekerja 0.900 0rg/hr
Tukang Batu 0.450 0rg/hr
Kepala Tukang 0.045 0rg/hr
Mandor 0.045 0rg/hr

54b 1 m² Pasang Dinding Keramik Ukuran (30 x 60) cm polished setara Roman Gol. A
54c 1 m² Pasang Dinding Keramik Ukuran (20 x 60 ) cm polished setara Roman Gol. B
Bahan
Keramik dinding 20 x 60 Gol. B 1.320 M2
PC 9.300 kg
PP 0.045 M³
Semen Warna 1.940 kg
Tenaga Kerja
Pekerja 0.900 0rg/hr
Tukang Batu 0.450 0rg/hr
Kepala Tukang 0.045 0rg/hr
Mandor 0.045 0rg/hr

54c 1 m² Pasang Dinding Keramik Ukuran (20 x 60 ) cm polished setara Roman Gol. B

54d 1 m² Pasang Dinding Homogenous Ukuran (30 x 60 ) cm setara Niro Granit


Bahan
Homogeneus 300 x 600 type Polished 1.080 M2
PC 9.300 kg
PP 0.045 M³
Semen Warna 1.940 kg
Tenaga Kerja
Pekerja 0.900 0rg/hr
Tukang Batu 0.450 0rg/hr
Kepala Tukang 0.045 0rg/hr

A.4.4.3.Pek.Penutup lt&Ddg / HAL 253 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Mandor 0.045 0rg/hr

54d 1 m² Pasang Dinding Homogenous Ukuran (30 x 60 ) cm setara Niro Granit

54e 1 m² Pasang Dinding Homogenous Ukuran (60 x 60 ) cm setara Niro Granit


Bahan
Homogeneus 600 x 600 type Polished BERMOTIF 1.080 M2
PC 9.300 kg
PP 0.045 M³
Semen Warna 1.940 kg
Tenaga Kerja
Pekerja 0.900 0rg/hr
Tukang Batu 0.450 0rg/hr
Kepala Tukang 0.045 0rg/hr
Mandor 0.045 0rg/hr

54e 1 m² Pasang Dinding Homogenous Ukuran (60 x 60 ) cm setara Niro Granit

A.4.4.3.Pek.Penutup lt&Ddg / HAL 254 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

54f 1 m² Pasang Dinding Homogenous Ukuran (60 x 120 ) cm setara Niro Granit
Bahan
Homogeneus 600 x 1200 type Matte 1.008 M2
PC 9.300 kg
PP 0.045 M³
Semen Warna 1.940 kg
Tenaga Kerja
Pekerja 0.900 0rg/hr
Tukang Batu 0.450 0rg/hr
Kepala Tukang 0.045 0rg/hr
Mandor 0.045 0rg/hr

54f 1 m² Pasang Dinding Homogenous Ukuran (60 x 120 ) cm setara Niro Granit
55 1 m' Pasang dinding Marmer Ukuran (slab ) setara Ujung Pandang
Bahan
Marmer slab Ujungpandang 1.060 M2
PC 12.440 kg
PP 0.025 M³
Semen Warna 0.650 kg
Tenaga Kerja
Pekerja 1.300 0rg/hr
Tukang Batu 0.650 0rg/hr
Kepala Tukang 0.065 0rg/hr
Mandor 0.065 0rg/hr

55 1 m' Pasang dinding Marmer Ukuran (slab ) setara Ujung Pandang


55a 1 m' Pasang dinding Marmer Ukuran (60x60) cm setara Ujung Pandang
Bahan
Marmer 60 x 60 type Polised 1.060 M2
PC 12.440 kg
PP 0.025 M³
Semen Warna 0.650 kg
Tenaga Kerja
Pekerja 1.300 0rg/hr
Tukang Batu 0.650 0rg/hr
Kepala Tukang 0.065 0rg/hr
Mandor 0.065 0rg/hr

55a 1 m' Pasang dinding Marmer Ukuran (60x60) cm setara Ujung Pandang
55b 1 m' Pasang dinding Granit alam slab setara India
Bahan
Granit macam-macam corak slab Luar Negeri (Nero India) 1.060 M2
PC 12.440 kg
PP 0.025 M³
Semen Warna 0.650 kg
Tenaga Kerja
Pekerja 1.300 0rg/hr
Tukang Batu 0.650 0rg/hr
Kepala Tukang 0.065 0rg/hr

A.4.4.3.Pek.Penutup lt&Ddg / HAL 255 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Mandor 0.065 0rg/hr

55b 1 m' Pasang dinding Granit alam slab setara India

A.4.4.3.Pek.Penutup lt&Ddg / HAL 256 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

55c 1 m' Pasang Marmer tangga Ukuran (slab ) setara Ujung Pandang
Bahan
Marmer slab Ujungpandang 1.060 M2
PC 12.440 kg
PP 0.025 M³
Semen Warna 0.650 kg
Tenaga Kerja
Pekerja 1.950 0rg/hr
Tukang Batu 0.975 0rg/hr
Kepala Tukang 0.098 0rg/hr
Mandor 0.098 0rg/hr

55c 1 m' Pasang Marmer tangga Ukuran (slab ) setara Ujung Pandang
55c 1 m' Pasang step Marmer tangga Ukuran (slab ) setara Ujung Pandang (termasuk grooving dan b
Bahan
Marmer slab Ujungpandang 1.060 M2
PC 12.440 kg
PP 0.025 M³
Semen Warna 0.650 kg
Tenaga Kerja ( termasuk upah grooving dan bullnose )
Pekerja 3.900 0rg/hr
Tukang Batu 1.950 0rg/hr
Kepala Tukang 0.195 0rg/hr
Mandor 0.195 0rg/hr

55c 1 m' Pasang step Marmer tangga Ukuran (slab ) setara Ujung Pandang (termasuk grooving dan b
56 1 m2 Pasang dinding bata pelapis ukuran (3x7x24) cm
Bahan
Bata pelapis ukuran (3x7x24) cm 63.000 buah
PC 12.440 kg
PP 0.025 M³
Semen Warna 2.750 kg
Tenaga Kerja
Pekerja 1.000 0rg/hr
Tukang Batu 0.500 0rg/hr
Kepala Tukang 0.050 0rg/hr
Mandor 0.050 0rg/hr

56 1 m2 Pasang dinding bata pelapis ukuran (3x7x24) cm

A.4.4.3.Pek.Penutup lt&Ddg / HAL 257 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

57 1 m2 Pasang dinding batu paras


Bahan
Batu paras Bali 1.100 M2
PC 11.750 kg
PP 0.035 M³
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

57 1 m2 Pasang dinding batu paras

58 1 m2 Pasang dinding batu tempel hitam


Bahan
Batu tempel andesit 1.100 M2
PC 11.750 kg
PP 0.035 M³
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

58 1 m2 Pasang dinding batu tempel hitam


58a 1 m2 Pasang dinding batu Candi
Bahan
Batu Candi 1.100 M2
PC 11.750 kg
PP 0.035 M³
Tenaga Kerja
Pekerja 0.700 0rg/hr
Tukang Batu 0.350 0rg/hr
Kepala Tukang 0.035 0rg/hr
Mandor 0.035 0rg/hr

58a 1 m2 Pasang dinding batu Candi

59 1 m2 Pasang Vinyl setara Forbo Sarlon Sparkling 15db t=2,6mm (Harga terpasang)
Bahan
Vinyl Forbo Sarlon Sparkling 15db t=2,6mm (Harga
1.050 M2
terpasang)
Instalasi Vinyl (Harga terpasang) 1.050 M2
Pemerataan lantai 1.050 M2

59 1 m2 Pasang Vinyl setara Forbo Sarlon Sparkling 15db t=2,6mm (Harga terpasang)
60 1 m2 Pasang wall paper, lebar 50cm
Bahan

A.4.4.3.Pek.Penutup lt&Ddg / HAL 258 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Wall paper 1.200 M'
Lem 0.200 kg
Tenaga Kerja
Pekerja 0.020 0rg/hr
Tukang Batu 0.200 0rg/hr
Kepala Tukang 0.020 0rg/hr
Mandor 0.003 0rg/hr

60 1 m2 Pasang wall paper, lebar 50cm

A.4.4.3.Pek.Penutup lt&Ddg / HAL 259 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

61 1 m2 Pasang Floor hardener natural ex. Sika Chapdur


Bahan
Sika Chapdur 5.000 kg
Material penunjang dan alat bantu 1.000 ls
Tenaga Kerja Rp 0.72
Pekerja 0.252 0rg/hr
Tukang Batu 0.126 0rg/hr
Kepala Tukang 0.012 0rg/hr
Mandor 0.006 0rg/hr

61 1 m2 Pasang Floor hardener natural ex. Sika Chapdur


61a 1 m2 Pasang Floor hardener warna ex. Sika Chapdur
Bahan
Sika Chapdur 5.000 kg
Material penunjang dan alat bantu 1.000 ls
Tenaga Kerja
Pekerja 0.350 0rg/hr
Tukang Batu 0.175 0rg/hr
Kepala Tukang 0.017 0rg/hr
Mandor 0.002 0rg/hr

61a 1 m2 Pasang Floor hardener warna ex. Sika Chapdur


62 1 m' Pasang plin vinyl dengan perekat
Bahan
Plin Vinyl 1.760 bh
Lem vinyl 0.080 kg
Tenaga Kerja
Pekerja 0.080 0rg/hr
Tukang Batu 0.080 0rg/hr
Kepala Tukang 0.008 0rg/hr
Mandor 0.004 0rg/hr

62 1 m' Pasang plin vinyl dengan perekat

63 1 m' Pasang plin plin kayu Kamper Samarinda ukuran ( t=2cm x l=10 )
Bahan
Papan kayu Kamper Samarinda 0.003 M3
Sekrup+piser 0.050 kg
Tenaga Kerja
Pekerja 0.120 0rg/hr
Tukang Batu 0.120 0rg/hr
Kepala Tukang 0.012 0rg/hr
Mandor 0.006 0rg/hr

63 1 m' Pasang plin vinyl dengan perekat

64 1 m² Pemasangan Paving t=6 Cm natural


Bahan
Paving Block 1.0100 bh
A.4.4.3.Pek.Penutup lt&Ddg / HAL 260 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
Pasir beton 0.1000 m³
Peralatan 1.0000 Ls
Tenaga Kerja
Pekerja 0.2500 org/hr
Tukang Batu 0.5000 org/hr
Kepala Tukang Batu 0.0250 org/hr
Mandor 0.0030 org/hr

64 1 m² Pemasangan Paving t=6 Cm natural

A.4.4.3.Pek.Penutup lt&Ddg / HAL 261 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

65 1 m² Pemasangan Paving t=8 Cm natural


Bahan
Paving Block 1.0100 bh
Pasir beton 0.1000 m³
Peralatan 1.0000 Ls
Tenaga Kerja
Pekerja 0.2500 org/hr
Tukang Batu 0.5000 org/hr
Kepala Tukang Batu 0.0250 org/hr
Mandor 0.0030 org/hr

65 1 m² Pemasangan Paving t=8 Cm natural

66 1 m² Pemasangan Paving t=6 Cm warna


Bahan
Paving Block 1.0100 bh
Pasir beton 0.1000 m³
Peralatan 1.0000 Ls
Tenaga Kerja
Pekerja 0.2500 org/hr
Tukang Batu 0.5000 org/hr
Kepala Tukang Batu 0.0250 org/hr
Mandor 0.0030 org/hr

66 1 m² Pemasangan Paving t=6 Cm warna

67 1 m² Pemasangan Paving t=8 Cm warna


Bahan
Paving Block 1.0100 bh
Pasir beton 0.1000 m³
Peralatan 1.0000 Ls
Tenaga Kerja
Pekerja 0.2500 org/hr
Tukang Batu 0.5000 org/hr
Kepala Tukang Batu 0.0250 org/hr
Mandor 0.0030 org/hr

67 1 m² Pemasangan Paving t=8 Cm warna

68 1 m2 Lantai grass block - T. 6 cm


a. Bahan:
- Paving Grassblock t. 6 cm 8.6234 bh
- Pasir urug 0.1265 m3
- Tanah humus 0.0690 m3
- Rumput gajah 0.2300 m2
b. Upah:
- Pekerja 0.2500 hari
- Tukang 0.5000 hari
- Kepala Tukang 0.0250 hari
- Mandor 0.0030 hari

A.4.4.3.Pek.Penutup lt&Ddg / HAL 262 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

68 1 m2 Lantai grass block - T. 6 cm

69 1 m2 Lantai grass block - T. 8 cm


a. Bahan:
- Paving Grassblock t. 8 cm 8.6234 bh
- Pasir urug 0.1265 m3
- Tanah humus 0.0690 m3
- Rumput gajah 0.2300 m2
b. Upah:
- Kepala Tukang 0.2500 hari
- Tukang 0.5000 hari
- Pekerja 0.0250 hari
- Mandor 0.0030 hari

69 1 m2 Lantai grass block - T. 8 cm

A.4.4.3.Pek.Penutup lt&Ddg / HAL 263 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
70 1 m' Pasang Stair nozing Keramik Ukuran (10 x 20) cm setara Roman
Bahan
Stair nozing Keramik Ukuran (10 x 20) cm setara Roman 5.000 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr

70 1 m' Pasang Stair nozing Keramik Ukuran (10 x 20) cm setara Roman
71 1 m' Pasang Stair nozing Keramik Ukuran (10 x 30) cm setara Roman
Bahan
Stair nozing Keramik Ukuran (10 x 30) cm setara Roman 3.333 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr

71 1 m' Pasang Stair nozing Keramik Ukuran (10 x 30) cm setara Roman

72 1 m' Pasang Step tile Keramik Ukuran (30 x 30) cm setara Roman
Bahan
Step tile Keramik Ukuran (30 x 30) cm setara Roman 3.333 buah
PC 3.000 kg
PP 0.014 M³
Semen Warna 0.150 kg
Tenaga Kerja
Pekerja 0.210 0rg/hr
Tukang Batu 0.105 0rg/hr
Kepala Tukang 0.011 0rg/hr
Mandor 0.011 0rg/hr

72 1 m' Pasang Step tile Keramik Ukuran (30 x 30) cm setara Roman

73 1 M² Screeding tebal 3 cm
Bahan
Semen 0.288 zak
Pasir beton 0.039 m³
Tenaga Kerja
Tukang Batu 0.100 org/hr
Kepala Tukang 0.010 org/hr
Pekerja 0.200 org/hr
Mandor 0.010 org/hr

A.4.4.3.Pek.Penutup lt&Ddg / HAL 264 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

73 1 M² Screeding tebal 3 cm
74 1 M² Water profing coating
Bahan
Pre treatment/cleaning 1.050 m²
Curbing sudut 0.400 m'
Water profing ex. Sika Top 107 Seal ( 3 kali lapis ) 1.000 m²
Kuas 0.200 bh
Tenaga Kerja
Tukang Batu 0.200 org/hr
Kepala Tukang 0.020 org/hr
Pekerja 0.100 org/hr
Mandor 0.010 org/hr

74 1 M² Water profing coating

A.4.4.3.Pek.Penutup lt&Ddg / HAL 265 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
75 1 M² Water profing Membrane ex. Sika Bituseal untuk atap dak beton
Bahan
Pre treatment/cleaning 1.050 m²
Curbing sudut 0.400 m'
Sika Bituseal T-130 SG 1.050 kg
Tenaga Kerja
Tukang Batu 0.500 org/hr
Kepala Tukang 0.050 org/hr
Pekerja 0.250 org/hr
Mandor 0.013 org/hr

75 1 M² Water profing Membrane ex. Sika Bituseal untuk atap dak beton

A.4.4.3.Pek.Penutup lt&Ddg / HAL 266 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
76 1 M² Water profing Rain tite ex. Sika
Bahan
Pre treatment/cleaning 1.050 m²
Curbing sudut 0.400 m'
Sika Bituseal T-130 SG 2.400 kg
Tenaga Kerja
Tukang Batu 0.500 org/hr
Kepala Tukang 0.050 org/hr
Pekerja 0.250 org/hr
Mandor 0.013 org/hr

76 1 M² Water profing Rain tite ex. Sika


77 1 M² Pekerjaan meja beton wastafel finish. Batu granit alam
Terpasang :
Membuat beton mutu fc=21.7 Mpa (K 250), slum (12 ± 2) cm,
0.080 m3
w/c = 0.56
- Besi 8.000 kg
- Bekisting 1.100 m²
- Pasang granit alam 1.100 m²
- Pas Bata merah 0.480 m²
- Plesteran 0.960 m²

77 1 M² Pekerjaan meja beton wastafel finish. Batu granit alam

78 1 M² Pekerjaan meja beton pantry finish. Keramik 30 x 30 cm berikut dinding


Terpasang :
Membuat beton mutu fc=21.7 Mpa (K 250), slum (12 ± 2) cm,
0.080 m3
w/c = 0.56
- Besi 8.000 kg
- Bekisting 1.100 m²
- Pasang keramik 30 x 30 cm meja + dinding 2.428 m²
- Pas Bata merah 0.480 m²
- Plesteran 0.960 m²

78 1 M² Pekerjaan meja beton pantry finish. Keramik 30 x 30 cm berikut dinding

79 1 m2 Lantai beton sikat ( Pearl stone )


a. Bahan:
- Batu sikat 15.0000 kg
- Sement / PC kwalitas 3 Roda 0.2820 zk
- Pasir pasang 0.0350 m3
b. Upah:
- Pekerja 0.0350 hari
- Tukang 0.3500 hari
- Kepala tukang 0.7000 hari
- Mandor 0.0350 hari

79 1 m2 Lantai beton sikat ( Pearl stone )

80 1 m2 Epoxy floor lining 2000 um ( 2mm )


A.4.4.3.Pek.Penutup lt&Ddg / HAL 267 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
a. Terpasang :
Material : Dongyang Epoxy Primer EP 118, Dongyang 1.0500 M2
Scraping Material, Dongyang Epoxy finish ET 5635 -
Selfleveling type.

80 1 m2 Epoxy floor lining 2000 um ( 2mm )

81 1 m2 Epoxy floor lining 3000 um ( 3mm )


a. Terpasang :
Material : Dongyang Epoxy Primer EP 118, Dongyang 1.0500 M2
Scraping Material, Dongyang Epoxy finish ET 5635 -
Selfleveling type.

81 1 m2 Epoxy floor lining 3000 um ( 3mm )

A.4.4.3.Pek.Penutup lt&Ddg / HAL 268 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
70a 1 m' Pasang Stair nozing homogenous tile Ukuran (10 x 20) cm
Bahan
Stair nozing homogenous tile Ukuran (10 x 20) cm 5.000 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr

70a 1 m' Pasang Stair nozing homogenous tile Ukuran (10 x 20) cm
71a 1 m' Pasang Stair nozing homogenous tile Ukuran (10 x 30) cm
Bahan
Stair nozing homogenous tile Ukuran (10 x 30) cm 3.333 buah
PC 1.140 kg
PP 0.003 M³
Semen Warna 0.025 kg
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr

71a 1 m' Pasang Stair nozing homogenous tile Ukuran (10 x 30) cm

72a 1 m' Pasang Step nosing alumunium


Bahan
Step tile alumunium 1.000 m'
bahan penunjang 0.100 ls
Tenaga Kerja
Pekerja 0.090 0rg/hr
Tukang Batu 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.005 0rg/hr

72a 1 m' Pasang Step nosing alumunium


76 1 M² Water profing Expose Bitumen DUO Composite Membrane 4MM
Bahan
Duo HT 4 AGR/ F WGG 1.000 m²
Primer 1.000 m²
Fastener 1.000 m²
Mechano Plate 1.000 m²
Tenaga Kerja
Tukang Batu 0.215 org/hr
Kepala Tukang 0.022 org/hr
Pekerja 0.215 org/hr
Mandor 0.011 org/hr

A.4.4.3.Pek.Penutup lt&Ddg / HAL 269 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

76 1 M² Water profing Expose Bitumen DUO Composite Membrane 4MM


55b 1 m' Pasang plint Marmer Ukuran (10x60) cm setara Ujung Pandang
Bahan
Marmer 60 x 60 type Polised 0.177 M2
PC 2.073 kg
PP 0.004 M³
Semen Warna 0.108 kg
Tenaga Kerja
Pekerja 0.433 0rg/hr
Tukang Batu 0.217 0rg/hr
Kepala Tukang 0.022 0rg/hr
Mandor 0.022 0rg/hr

55b 1 m' Pasang plint Marmer Ukuran (10x60) cm setara Ujung Pandang
77 1 M² Raised Floor Finish HPL "HPL Steel Panel" By Spescialist
Bahan
Raised Floor Finish HPL "HPL Steel Panel" By Spescialist 1.000 M2
Tile lifter 0.003 kg
Tenaga Kerja
Jasa pemasangan 1.000 M2

77 1 M² Raised Floor Finish HPL "HPL Steel Panel" By Spescialist

A.4.4.3.Pek.Penutup lt&Ddg / HAL 270 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

54g 1 m² Pasang Dinding Keramik Ukuran (30 x 30) cm polished setara Roman Gol. B
Bahan
Keramik Ukuran (30 x 30) cm polished setara Roman Gol. B 1.050 M2
PC 9.300 kg
PP 0.045 M³
Semen Warna 1.940 kg
Tenaga Kerja
Pekerja 0.900 0rg/hr
Tukang Batu 0.450 0rg/hr
Kepala Tukang 0.045 0rg/hr
Mandor 0.045 0rg/hr

54g 1 m² Pasang Dinding Keramik Ukuran (30 x 30) cm polished setara Roman Gol. B
54h 1 m² Pasang Dinding Keramik Ukuran (50 x 50) cm polished setara Roman Gol. B
Bahan
Keramik Ukuran (50 x 50) cm polished setara Roman Gol. B 1.050 M2
PC 9.300 kg
PP 0.045 M³
Semen Warna 1.940 kg
Tenaga Kerja
Pekerja 0.900 0rg/hr
Tukang Batu 0.450 0rg/hr
Kepala Tukang 0.045 0rg/hr
Mandor 0.045 0rg/hr

54h 1 m² Pasang Dinding Keramik Ukuran (50 x 50) cm polished setara Roman Gol. B
55 1 m² Raised floor bolted stringe steel cementitious understructure type + finis HPL
Terpasang
Raised floor bolted stringe steel cementitious understructure ty 1.050 M2

55 1 m² Raised floor bolted stringe steel cementitious understructure type + finis HPL

56 1 m² Raised floor 600x600x35 mm, 700 mm Finished Floor High (FFH)


Terpasang
Raised floor 600x600x35 mm, 700 mm Finished Floor High (FF 1.050 M2

56 1 m² Raised floor 600x600x35 mm, 700 mm Finished Floor High (FFH)

A.4.4.3.Pek.Penutup lt&Ddg / HAL 271 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

169,391.07
137,940.00 144,837.00
1,322.20 10,828.82
175,450.00 7,895.25
11,660.00 5,830.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 291,070.32
Overhead & keuntungan 10% : 29,107.03
Jumlah : 320,177.35
Dibulatkan : 320,100.00

204,734.07
171,600.00 180,180.00
1,322.20 10,828.82
175,450.00 7,895.25
11,660.00 5,830.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 326,413.32
Overhead & keuntungan 10% : 32,641.33
Jumlah : 359,054.65
Dibulatkan : 359,000.00

145,912.25
113,300.00 118,965.00
1,322.20 13,222.00
175,450.00 7,895.25
11,660.00 5,830.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 267,591.50
Overhead & keuntungan 10% : 26,759.15
Jumlah : 294,350.65
Dibulatkan : 294,300.00
Unpolished/Anti slip setara Roman Gol. B
177,155.08
129,690.00 138,547.83
1,322.20 13,222.00
175,450.00 7,895.25
11,660.00 17,490.00
121,679.25
89,320.00 62,524.00
A.4.4.3.Pek.Penutup lt&Ddg / HAL 272 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 298,834.33
Overhead & keuntungan 10% : 29,883.43
Jumlah : 328,717.76
Unpolished/Anti slip setara Roman Gol. B Dibulatkan : 328,700.00

146,441.13
113,300.00 118,965.00
1,322.20 13,750.88
175,450.00 7,895.25
11,660.00 5,830.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 268,120.38
Overhead & keuntungan 10% : 26,812.04
Jumlah : 294,932.42
Dibulatkan : 294,900.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 273 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

153,371.13
119,900.00 125,895.00
1,322.20 13,750.88
175,450.00 7,895.25
11,660.00 5,830.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 275,050.38
Overhead & keuntungan 10% : 27,505.04
Jumlah : 302,555.42
Dibulatkan : 302,500.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 274 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

153,371.13
119,900.00 125,895.00
1,322.20 13,750.88
175,450.00 7,895.25
11,660.00 5,830.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 275,050.38
Overhead & keuntungan 10% : 27,505.04
Jumlah : 302,555.42
Dibulatkan : 302,500.00

162,994.81
122,100.00 126,984.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 15,158.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 284,674.06
Overhead & keuntungan 10% : 28,467.41
Jumlah : 313,141.47
Dibulatkan : 313,100.00

169,858.81
128,700.00 133,848.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 15,158.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 291,538.06
Overhead & keuntungan 10% : 29,153.81
Jumlah : 320,691.87
Dibulatkan : 320,600.00

194,014.81
146,300.00 158,004.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 15,158.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
A.4.4.3.Pek.Penutup lt&Ddg / HAL 275 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
157,850.00 5,524.75
Jumlah 315,694.06
Overhead & keuntungan 10% : 31,569.41
Jumlah : 347,263.47
Dibulatkan : 347,200.00

203,518.81
155,100.00 167,508.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 15,158.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 325,198.06
Overhead & keuntungan 10% : 32,519.81
Jumlah : 357,717.87
Dibulatkan : 357,700.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 276 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

0) cm setara Niro Granit Polished Bermotif


439,930.81
374,000.00 403,920.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 15,158.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 561,610.06
Overhead & keuntungan 10% : 56,161.01
Jumlah : 617,771.07
0) cm setara Niro Granit Polished Bermotif Dibulatkan : 617,700.00

0) cm setara Niro Granit Matte Bermotif


428,050.81
363,000.00 392,040.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 15,158.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 549,730.06
Overhead & keuntungan 10% : 54,973.01
Jumlah : 604,703.07
0) cm setara Niro Granit Matte Bermotif Dibulatkan : 604,700.00
0) cm setara Niro Granit Polished Polos
439,930.81
374,000.00 403,920.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 15,158.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 561,610.06
Overhead & keuntungan 10% : 56,161.01
Jumlah : 617,771.07
0) cm setara Niro Granit Polished Polos Dibulatkan : 617,700.00

506,084.81
462,000.00 471,240.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 13,992.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
A.4.4.3.Pek.Penutup lt&Ddg / HAL 277 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
157,850.00 5,524.75
Jumlah 627,764.06
Overhead & keuntungan 10% : 62,776.41
Jumlah : 690,540.47
Dibulatkan : 690,500.00

593,204.81
517,000.00 558,360.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 13,992.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 714,884.06
Overhead & keuntungan 10% : 71,488.41
Jumlah : 786,372.47
Dibulatkan : 786,300.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 278 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

569,444.81
495,000.00 534,600.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 13,992.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 691,124.06
Overhead & keuntungan 10% : 69,112.41
Jumlah : 760,236.47
Dibulatkan : 760,200.00

217,007.01
4,400.00 145,200.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 50,954.20
182,676.73
89,320.00 93,786.00
137,445.00 72,158.63
157,850.00 8,366.05
157,850.00 8,366.05
Jumlah 399,683.74
Overhead & keuntungan 10% : 39,968.37
Jumlah : 439,652.11
Dibulatkan : 439,600.00

13,985.16
2,200.00 11,660.00
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
Jumlah 36,603.91
Overhead & keuntungan 10% : 3,660.39
Jumlah : 40,264.30
Dibulatkan : 40,200.00

16,991.82
4,400.00 14,666.67
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
A.4.4.3.Pek.Penutup lt&Ddg / HAL 279 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
Jumlah 39,610.57
Overhead & keuntungan 10% : 3,961.06
Jumlah : 43,571.63
Dibulatkan : 43,500.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 280 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

12,225.16
3,960.00 9,900.00
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
Jumlah 34,843.91
Overhead & keuntungan 10% : 3,484.39
Jumlah : 38,328.30
Dibulatkan : 38,300.00

14,241.82
7,150.00 11,916.67
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
Jumlah 36,860.57
Overhead & keuntungan 10% : 3,686.06
Jumlah : 40,546.63
Dibulatkan : 40,500.00

81,158.49
31,533.33 78,833.33
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
Jumlah 103,777.24
Overhead & keuntungan 10% : 10,377.72
Jumlah : 114,154.97
Dibulatkan : 114,100.00

85,558.49
49,940.00 83,233.33
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
A.4.4.3.Pek.Penutup lt&Ddg / HAL 281 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
Jumlah 108,177.24
Overhead & keuntungan 10% : 10,817.72
Jumlah : 118,994.97
Dibulatkan : 118,900.00
emium C1 Setara ex. Ujung Pandang
953,086.51
880,000.00 932,800.00
1,322.20 10,828.82
175,450.00 7,895.25
11,660.00 1,562.44
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 1,074,765.76
Overhead & keuntungan 10% : 107,476.58
Jumlah : 1,182,242.33
Dibulatkan : 1,182,200.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 282 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

603,286.51
550,000.00 583,000.00
1,322.20 10,828.82
175,450.00 7,895.25
11,660.00 1,562.44
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 724,965.76
Overhead & keuntungan 10% : 72,496.58
Jumlah : 797,462.33
Dibulatkan : 797,400.00

3,271,669.73
3,061,666.67 3,245,366.67
1,322.20 10,828.82
175,450.00 7,895.25
11,660.00 7,579.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 3,393,348.98
Overhead & keuntungan 10% : 339,334.90
Jumlah : 3,732,683.88
Dibulatkan : 3,732,600.00

575,395.81
513,700.00 539,385.00
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 15,158.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 697,075.06
Overhead & keuntungan 10% : 69,707.51
Jumlah : 766,782.57
Dibulatkan : 766,700.00

602,365.06
539,385.00 566,354.25
1,322.20 12,957.56
175,450.00 7,895.25
11,660.00 15,158.00
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
A.4.4.3.Pek.Penutup lt&Ddg / HAL 283 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
157,850.00 5,524.75
Jumlah 724,044.31
Overhead & keuntungan 10% : 72,404.43
Jumlah : 796,448.74
Dibulatkan : 796,400.00

871,151.05
807,434.10 847,805.81
66,700.70 23,345.25
42,654.15
89,320.00 15,184.40
137,445.00 23,365.65
157,850.00 2,683.45
157,850.00 1,420.65
Jumlah 913,805.20
Overhead & keuntungan 10% : 91,380.52
Jumlah : 1,005,185.72
Dibulatkan : 1,005,100.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 284 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

912,695.25
847,000.00 889,350.00
66,700.70 23,345.25
42,654.15
89,320.00 15,184.40
137,445.00 23,365.65
157,850.00 2,683.45
157,850.00 1,420.65
Jumlah 955,349.40
Overhead & keuntungan 10% : 95,534.94
Jumlah : 1,050,884.33
Dibulatkan : 1,050,800.00

102,095.25
75,000.00 78,750.00
66,700.70 23,345.25
30,053.10
89,320.00 10,718.40
137,445.00 16,493.40
157,850.00 1,894.20
157,850.00 947.10
Jumlah 132,148.35
Overhead & keuntungan 10% : 13,214.83
Jumlah : 145,363.18
Dibulatkan : 145,300.00

336,617.49
282,473.40 296,597.07
66,700.70 40,020.42
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 458,296.74
Overhead & keuntungan 10% : 45,829.67
Jumlah : 504,126.41
Dibulatkan : 504,100.00

633,227.27
564,958.90 593,206.85
66,700.70 40,020.42
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 754,906.52
Overhead & keuntungan 10% : 75,490.65
Jumlah : 830,397.17
Dibulatkan : 830,300.00

159,412.11
110,000.00 116,600.00
A.4.4.3.Pek.Penutup lt&Ddg / HAL 285 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
1,322.20 12,296.46
175,450.00 7,895.25
11,660.00 22,620.40
156,444.75
89,320.00 80,388.00
137,445.00 61,850.25
157,850.00 7,103.25
157,850.00 7,103.25
Jumlah 315,856.86
Overhead & keuntungan 10% : 31,585.69
Jumlah : 347,442.55
Dibulatkan : 347,400.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 286 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

169,862.11
121,000.00 127,050.00
1,322.20 12,296.46
175,450.00 7,895.25
11,660.00 22,620.40
156,444.75
89,320.00 80,388.00
137,445.00 61,850.25
157,850.00 7,103.25
157,850.00 7,103.25
Jumlah 326,306.86
Overhead & keuntungan 10% : 32,630.69
Jumlah : 358,937.55
Dibulatkan : 358,900.00

206,822.11
156,200.00 164,010.00
1,322.20 12,296.46
175,450.00 7,895.25
11,660.00 22,620.40
156,444.75
89,320.00 80,388.00
137,445.00 61,850.25
157,850.00 7,103.25
157,850.00 7,103.25
Jumlah 363,266.86
Overhead & keuntungan 10% : 36,326.69
Jumlah : 399,593.55
Dibulatkan : 399,500.00

217,052.11
132,000.00 174,240.00
1,322.20 12,296.46
175,450.00 7,895.25
11,660.00 22,620.40
156,444.75
89,320.00 80,388.00
137,445.00 61,850.25
157,850.00 7,103.25
157,850.00 7,103.25
Jumlah 373,496.86
Overhead & keuntungan 10% : 37,349.69
Jumlah : 410,846.55
Dibulatkan : 410,800.00

446,732.11
374,000.00 403,920.00
1,322.20 12,296.46
175,450.00 7,895.25
11,660.00 22,620.40
156,444.75
89,320.00 80,388.00
137,445.00 61,850.25
157,850.00 7,103.25

A.4.4.3.Pek.Penutup lt&Ddg / HAL 287 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
157,850.00 7,103.25
Jumlah 603,176.86
Overhead & keuntungan 10% : 60,317.69
Jumlah : 663,494.55
Dibulatkan : 663,400.00

446,732.11
374,000.00 403,920.00
1,322.20 12,296.46
175,450.00 7,895.25
11,660.00 22,620.40
156,444.75
89,320.00 80,388.00
137,445.00 61,850.25
157,850.00 7,103.25
157,850.00 7,103.25
Jumlah 603,176.86
Overhead & keuntungan 10% : 60,317.69
Jumlah : 663,494.55
Dibulatkan : 663,400.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 288 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

563,948.11
517,000.00 521,136.00
1,322.20 12,296.46
175,450.00 7,895.25
11,660.00 22,620.40
156,444.75
89,320.00 80,388.00
137,445.00 61,850.25
157,850.00 7,103.25
157,850.00 7,103.25
Jumlah 720,392.86
Overhead & keuntungan 10% : 72,039.29
Jumlah : 792,432.15
Dibulatkan : 792,400.00

961,213.42
880,000.00 932,800.00
1,322.20 16,448.17
175,450.00 4,386.25
11,660.00 7,579.00
225,975.75
89,320.00 116,116.00
137,445.00 89,339.25
157,850.00 10,260.25
157,850.00 10,260.25
Jumlah 1,187,189.17
Overhead & keuntungan 10% : 118,718.92
Jumlah : 1,305,908.08
Dibulatkan : 1,305,900.00

611,413.42
550,000.00 583,000.00
1,322.20 16,448.17
175,450.00 4,386.25
11,660.00 7,579.00
225,975.75
89,320.00 116,116.00
137,445.00 89,339.25
157,850.00 10,260.25
157,850.00 10,260.25
Jumlah 837,389.17
Overhead & keuntungan 10% : 83,738.92
Jumlah : 921,128.08
Dibulatkan : 921,100.00

3,273,780.08
3,061,666.67 3,245,366.67
1,322.20 16,448.17
175,450.00 4,386.25
11,660.00 7,579.00
225,975.75
89,320.00 116,116.00
137,445.00 89,339.25
157,850.00 10,260.25

A.4.4.3.Pek.Penutup lt&Ddg / HAL 289 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
157,850.00 10,260.25
Jumlah 3,499,755.83
Overhead & keuntungan 10% : 349,975.58
Jumlah : 3,849,731.42
Dibulatkan : 3,849,700.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 290 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

961,213.42
880,000.00 932,800.00
1,322.20 16,448.17
175,450.00 4,386.25
11,660.00 7,579.00
338,963.63
89,320.00 174,174.00
137,445.00 134,008.88
157,850.00 15,390.38
157,850.00 15,390.38
Jumlah 1,300,177.04
Overhead & keuntungan 10% : 130,017.70
Jumlah : 1,430,194.75
Dibulatkan : 1,430,100.00
setara Ujung Pandang (termasuk grooving dan bullnose)
961,213.42
880,000.00 932,800.00
1,322.20 16,448.17
175,450.00 4,386.25
11,660.00 7,579.00
677,927.25
89,320.00 348,348.00
137,445.00 268,017.75
157,850.00 30,780.75
157,850.00 30,780.75
Jumlah 1,639,140.67
Overhead & keuntungan 10% : 163,914.07
Jumlah : 1,803,054.73
setara Ujung Pandang (termasuk grooving dan bullnos Dibulatkan : 1,803,000.00

210,399.42
2,500.00 157,500.00
1,322.20 16,448.17
175,450.00 4,386.25
11,660.00 32,065.00
173,827.50
89,320.00 89,320.00
137,445.00 68,722.50
157,850.00 7,892.50
157,850.00 7,892.50
Jumlah 384,226.92
Overhead & keuntungan 10% : 38,422.69
Jumlah : 422,649.61
Dibulatkan : 422,600.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 291 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

112,426.60
82,500.00 90,750.00
1,322.20 15,535.85
175,450.00 6,140.75
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 234,105.85
Overhead & keuntungan 10% : 23,410.59
Jumlah : 257,516.44
Dibulatkan : 257,500.00

330,226.60
280,500.00 308,550.00
1,322.20 15,535.85
175,450.00 6,140.75
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 451,905.85
Overhead & keuntungan 10% : 45,190.59
Jumlah : 497,096.44
Dibulatkan : 497,000.00

342,326.60
291,500.00 320,650.00
1,322.20 15,535.85
175,450.00 6,140.75
121,679.25
89,320.00 62,524.00
137,445.00 48,105.75
157,850.00 5,524.75
157,850.00 5,524.75
Jumlah 464,005.85
Overhead & keuntungan 10% : 46,400.59
Jumlah : 510,406.44
Dibulatkan : 510,400.00

992,985.74
814,000.00 854,700.00
66,700.70 70,035.74
65,000.00 68,250.00
Jumlah 992,985.74
Overhead & keuntungan 10% : 99,298.57
Jumlah : 1,092,284.31
Dibulatkan : 1,092,200.00

224,357.98

A.4.4.3.Pek.Penutup lt&Ddg / HAL 292 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
175,848.20 211,017.84
66,700.70 13,340.14
32,827.03
89,320.00 1,786.40
137,445.00 27,489.00
157,850.00 3,157.00
157,850.00 394.63
Jumlah 257,185.01
Overhead & keuntungan 10% : 25,718.50
Jumlah : 282,903.51
Dibulatkan : 282,900.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 293 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

30,855.00
5,610.00 28,050.00
2,805.00 2,805.00
42,724.84
89,320.00 22,508.64
137,445.00 17,318.07
157,850.00 1,932.08
157,850.00 966.04
Jumlah 73,579.84
Overhead & keuntungan 10% : 7,357.98
Jumlah : 80,937.82
Dibulatkan : 80,900.00

46,777.50
6,930.00 34,650.00
12,127.50 12,127.50
58,314.03
89,320.00 31,262.00
137,445.00 24,052.88
157,850.00 2,683.45
157,850.00 315.70
Jumlah 105,091.53
Overhead & keuntungan 10% : 10,509.15
Jumlah : 115,600.68
Dibulatkan : 115,600.00

482,882.72
271,333.33 477,546.67
66,700.70 5,336.06
20,035.40
89,320.00 7,145.60
137,445.00 10,995.60
157,850.00 1,262.80
157,850.00 631.40
Jumlah 502,918.12
Overhead & keuntungan 10% : 50,291.81
Jumlah : 553,209.93
Dibulatkan : 553,200.00

12,145.43
3,332,010.00 9,996.03
42,988.00 2,149.40
30,053.10
89,320.00 10,718.40
137,445.00 16,493.40
157,850.00 1,894.20
157,850.00 947.10
Jumlah 42,198.53
Overhead & keuntungan 10% : 4,219.85
Jumlah : 46,418.38
Dibulatkan : 46,400.00

147,620.00
115,500.00 116,655.00
A.4.4.3.Pek.Penutup lt&Ddg / HAL 294 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
175,450.00 17,545.00
13,420.00 13,420.00
95,472.30
89,320.00 22,330.00
137,445.00 68,722.50
157,850.00 3,946.25
157,850.00 473.55
Jumlah 243,092.30
Overhead & keuntungan 10% : 24,309.23
Jumlah : 267,401.53
Dibulatkan : 267,400.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 295 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

172,062.00
137,500.00 138,875.00
175,450.00 17,545.00
15,642.00 15,642.00
95,472.30
89,320.00 22,330.00
137,445.00 68,722.50
157,850.00 3,946.25
157,850.00 473.55
Jumlah 267,534.30
Overhead & keuntungan 10% : 26,753.43
Jumlah : 294,287.73
Dibulatkan : 294,200.00

159,841.00
126,500.00 127,765.00
175,450.00 17,545.00
14,531.00 14,531.00
95,472.30
89,320.00 22,330.00
137,445.00 68,722.50
157,850.00 3,946.25
157,850.00 473.55
Jumlah 255,313.30
Overhead & keuntungan 10% : 25,531.33
Jumlah : 280,844.63
Dibulatkan : 280,800.00

172,062.00
137,500.00 138,875.00
175,450.00 17,545.00
15,642.00 15,642.00
95,472.30
89,320.00 22,330.00
137,445.00 68,722.50
157,850.00 3,946.25
157,850.00 473.55
Jumlah 267,534.30
Overhead & keuntungan 10% : 26,753.43
Jumlah : 294,287.73
Dibulatkan : 294,280.00

231,344.37
18,700.00 161,257.63
121,440.00 15,359.31
137,203.00 9,465.25
196,828.50 45,262.17
95,472.30
89,320.00 22,330.00
137,445.00 68,722.50
157,850.00 3,946.25
157,850.00 473.55
Jumlah 326,816.67
Overhead & keuntungan 10% : 32,681.67
A.4.4.3.Pek.Penutup lt&Ddg / HAL 296 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
Jumlah : 359,498.33
Dibulatkan : 359,400.00

250,315.85
20,900.00 180,229.11
121,440.00 15,359.31
137,203.00 9,465.25
196,828.50 45,262.17
83,441.05
137,445.00 34,361.25
89,320.00 44,660.00
157,850.00 3,946.25
157,850.00 473.55
Jumlah 333,756.90
Overhead & keuntungan 10% : 33,375.69
Jumlah : 367,132.59
Dibulatkan : 367,100.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 297 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

398,325.16
79,200.00 396,000.00
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
Jumlah 420,943.91
Overhead & keuntungan 10% : 42,094.39
Jumlah : 463,038.30
Dibulatkan : 463,000.00

103,158.49
30,250.00 100,833.33
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
Jumlah 125,777.24
Overhead & keuntungan 10% : 12,577.72
Jumlah : 138,354.97
Dibulatkan : 138,300.00

272,084.18
79,200.00 264,000.00
1,322.20 3,966.60
175,450.00 2,368.58
11,660.00 1,749.00
36,503.78
89,320.00 18,757.20
137,445.00 14,431.73
157,850.00 1,657.43
157,850.00 1,657.43
Jumlah 308,587.95
Overhead & keuntungan 10% : 30,858.80
Jumlah : 339,446.75
Dibulatkan : 339,400.00

25,882.23
66,110.00 19,039.68
175,450.00 6,842.55
34,765.50
137,445.00 13,744.50
157,850.00 1,578.50
89,320.00 17,864.00
157,850.00 1,578.50
Jumlah 60,647.73

A.4.4.3.Pek.Penutup lt&Ddg / HAL 298 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
Overhead & keuntungan 10% : 6,064.77
Jumlah : 66,712.50
Dibulatkan : 66,700.00

68,808.00
3,000.00 3,150.00
2,500.00 1,000.00
60,500.00 60,500.00
20,790.00 4,158.00
41,156.50
137,445.00 27,489.00
157,850.00 3,157.00
89,320.00 8,932.00
157,850.00 1,578.50
Jumlah 109,964.50
Overhead & keuntungan 10% : 10,996.45
Jumlah : 120,960.95
Dibulatkan : 120,900.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 299 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

112,142.50
3,000.00 3,150.00
2,500.00 1,000.00
102,850.00 107,992.50
100,918.13
137,445.00 68,722.50
157,850.00 7,892.50
89,320.00 22,330.00
157,850.00 1,973.13
Jumlah 213,060.63
Overhead & keuntungan 10% : 21,306.06
Jumlah : 234,366.69
Dibulatkan : 234,300.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 300 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

129,550.00
3,000.00 3,150.00
2,500.00 1,000.00
52,250.00 125,400.00
100,918.13
137,445.00 68,722.50
157,850.00 7,892.50
89,320.00 22,330.00
157,850.00 1,973.13
Jumlah 230,468.13
Overhead & keuntungan 10% : 23,046.81
Jumlah : 253,514.94
Dibulatkan : 253,500.00

963,240.24 77,059.22
14,167.34 113,338.72
438,400.60 482,240.66
3,499,755.83 3,849,731.42
133,798.50 64,223.28
61,128.23 58,683.11
Jumlah 4,645,276.40
Overhead & keuntungan 10% : 464,527.64
Jumlah : 5,109,804.04
Dibulatkan : 5,109,800.00

963,240.24 77,059.22
14,167.34 113,338.72
438,400.60 482,240.66
318,221.86 772,642.68
133,798.50 64,223.28
61,128.23 58,683.11
Jumlah 1,568,187.66
Overhead & keuntungan 10% : 156,818.77
Jumlah : 1,725,006.43
Dibulatkan : 1,725,000.00

272,283.77
16,500.00 247,500.00
66,110.00 18,643.02
175,450.00 6,140.75
167,251.70
89,320.00 3,126.20
137,445.00 48,105.75
157,850.00 110,495.00
157,850.00 5,524.75
Jumlah 439,535.47
Overhead & keuntungan 10% : 43,953.55
Jumlah : 483,489.02
Dibulatkan : 483,400.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 301 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

236,485.70 248,309.99

Jumlah 248,309.99
Overhead & keuntungan 10% : 24,831.00
Jumlah : 273,140.98
Dibulatkan : 273,100.00

297,123.20 311,979.36

Jumlah 311,979.36
Overhead & keuntungan 10% : 31,197.94
Jumlah : 343,177.30
Dibulatkan : 343,100.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 302 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

98,575.16
19,250.00 96,250.00
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
Jumlah 121,193.91
Overhead & keuntungan 10% : 12,119.39
Jumlah : 133,313.30
Dibulatkan : 133,300.00

93,991.82
27,500.00 91,666.67
1,322.20 1,507.31
175,450.00 526.35
11,660.00 291.50
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
Jumlah 116,610.57
Overhead & keuntungan 10% : 11,661.06
Jumlah : 128,271.63
Dibulatkan : 128,200.00

49,500.00
45,000.00 45,000.00
45,000.00 4,500.00
22,618.75
89,320.00 8,038.80
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 789.25
Jumlah 72,118.75
Overhead & keuntungan 10% : 7,211.88
Jumlah : 79,330.63
Dibulatkan : 79,300.00

312,700.00
280,000.00 280,000.00
20,000.00 20,000.00
3,100.00 3,100.00
9,600.00 9,600.00
53,845.14
137,445.00 29,550.68
157,850.00 3,393.78
89,320.00 19,203.80
157,850.00 1,696.89
Jumlah 366,545.14
Overhead & keuntungan 10% : 36,654.51
A.4.4.3.Pek.Penutup lt&Ddg / HAL 303 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00
Jumlah : 403,199.65
Dibulatkan : 403,100.00

101,902.24
550,000.00 97,166.67
1,322.20 2,741.36
175,450.00 731.04
11,660.00 1,263.17
75,325.25
89,320.00 38,705.33
137,445.00 29,779.75
157,850.00 3,420.08
157,850.00 3,420.08
Jumlah 177,227.49
Overhead & keuntungan 10% : 17,722.75
Jumlah : 194,950.23
Dibulatkan : 194,900.00

981,155.00
980,000.00 980,000.00
350,000.00 1,155.00
60,000.00
60,000.00 60,000.00
Jumlah 1,041,155.00
Overhead & keuntungan 10% : 104,115.50
Jumlah : 1,145,270.50
Dibulatkan : 1,145,200.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 304 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5.00 6.00 7.00

161,777.11
113,300.00 118,965.00
1,322.20 12,296.46
175,450.00 7,895.25
11,660.00 22,620.40
156,444.75
89,320.00 80,388.00
137,445.00 61,850.25
157,850.00 7,103.25
157,850.00 7,103.25
Jumlah 318,221.86
Overhead & keuntungan 10% : 31,822.19
Jumlah : 350,044.05
Dibulatkan : 350,000.00

205,667.11
155,100.00 162,855.00
1,322.20 12,296.46
175,450.00 7,895.25
11,660.00 22,620.40
156,444.75
89,320.00 80,388.00
137,445.00 61,850.25
157,850.00 7,103.25
157,850.00 7,103.25
Jumlah 362,111.86
Overhead & keuntungan 10% : 36,211.19
Jumlah : 398,323.05
Dibulatkan : 398,300.00

1,848,000.00
1,760,000.00 1,848,000.00

Jumlah 1,848,000.00
Overhead & keuntungan 10% : 184,800.00
Jumlah : 2,032,800.00
Dibulatkan : 2,032,800.00

1,853,995.50
1,765,710.00 1,853,995.50

Jumlah 1,853,995.50
Overhead & keuntungan 10% : 185,399.55
Jumlah : 2,039,395.05
Dibulatkan : 2,039,300.00

A.4.4.3.Pek.Penutup lt&Ddg / HAL 305 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4
A.4.5.2 PEKERJAAN PENUTUP ATAP

41 1 m2 Pemasangan 1 m2 atap alumunium


a. Bahan:
Atap alumunium gelombang 1.0500 m2
Paku hak panjang 15 cm 0.0200 kg
b. Upah:
Kepala Tukang las 0.0100 hari
Tukang las 0.1000 hari
Pekerja 0.2000 hari
Mandor 0.0100 hari

41 1 m2 Pemasangan 1 m2 atap alumunium

41a 1 m2 Pasang atap Zinc Allumunium Kiplok CB. 0.50 TCT Colorbond
a. Bahan:
Atap zincalume Kliplok CB. 0.50 TCT Colorbond 1.0500 m2
Paku hak panjang 15 cm 0.2000 kg
b. Upah:
Kepala Tukang las 0.0100 hari
Tukang las 0.1000 hari
Pekerja 0.2000 hari
Mandor 0.0100 hari

41a 1 m2 Pasang atap Zinc Allumunium Kiplok CB. 0.50 TCT Colorbond

41b 1 m2 Pasang atap Zinc Allumunium Standing seam TCT 0.50 mm


1 Bahan
Zinc Allumunium Standing seam TCT 0.50 mm 1.050 m3
Paku hak panjang 15 cm 0.020 kg
2 Tenaga
Pekerja 0.150 oh
Tukang kayu 0.750 oh
Kepala tukang 0.008 oh
Mandor 0.006 oh

41b 1 m2 Pasang atap Zinc Allumunium Standing seam TCT 0.50 mm

42 1 m1 Pemasangan 1 m’ nok alumunium


1 Bahan
Nok Standar 40 x 18 1.200 m1
Paku hak panjang 15 cm 0.040 kg
2 Tenaga
Pekerja 0.100 oh
Tukang kayu 1.000 oh
Kepala tukang 0.100 oh
Mandor 0.050 oh

A.4.5.2. Penutup Atap / HAL 306 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4

42 1 m1 Pemasangan 1 m’ nok alumunium


42.a 1 m1 Ridge capping 0.45 TCT Zincalume 940 Width
1 Bahan
Ridge capping - 0.45 TCT Zincalume 940 width 1.200 m1
Paku hak panjang 15 cm 0.040 kg
2 Tenaga
Pekerja 0.100 oh
Tukang kayu 1.000 oh
Kepala tukang 0.100 oh
Mandor 0.050 oh

42.a 1 m1 Ridge capping 0.45 TCT Zincalume 940 Width

A.4.5.2. Penutup Atap / HAL 307 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4
42.b 1 m1 Longtudinat pascia capping 0.45mm TCT
1 Bahan
Longitudinal fascia Capping - 0.45 TCT colorbo 1.200 m1
Paku hak panjang 15 cm 0.040 kg
2 Tenaga
Pekerja 0.100 oh
Tukang kayu 1.000 oh
Kepala tukang 0.100 oh
Mandor 0.050 oh

42.b 1 m1 Longtudinat pascia capping 0.45mm TCT


43 1 m2 Pemasangan alumunium foil/sisalation Setara Primary Smart Foam 6.5 mm
1 Bahan
Alumunium foil Setara Primary Smart Foam
1.050 m2
6.5 mm
2 Tenaga
Pekerja 0.100 oh
Tukang kayu 0.050 oh
Kepala tukang 0.005 oh
Mandor 0.008 oh

43 1 m2 Pemasangan alumunium foil/sisalation Setara Primary Smart Foam 6.5 mm


44 1 m1 Gutter 0.50 TCT zincalume
1 Bahan
- Talang U 1230 Zincalume t=0.50mm 1.050 m'
2 Tenaga
Pekerja 0.100 oh
Tukang kayu 0.050 oh
Kepala tukang 0.005 oh
Mandor 0.008 oh

44 1 m1 Gutter 0.50 TCT zincalume


45 1 m1 Talang Vertikal Pralon D 1 1/2"

a. Bahan:
Pralon Ø 1 1/2" setara AW 0.2750 btg
Sambungan Pelengkap (15% harga pralon) 0.1000 ls
Lem PVC 0.0200 kg
b. Upah:
Tukang pipa 0.0750 hari
Mandor 0.0100 hari

45 1 m1 Talang Vertikal Pralon D 1 1/2"


46 1 m1 Talang Vertikal Pralon D 2"

A.4.5.2. Penutup Atap / HAL 308 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4
a. Bahan:
Pralon Ø 2" setara AW 0.2750 btg
Sambungan Pelengkap (15% harga pralon) 0.1000 ls
Lem PVC 0.0200 kg
b. Upah:
Tukang pipa 0.0750 hari
Mandor 0.0100 hari

46 1 m1 Talang Vertikal Pralon D 2"

A.4.5.2. Penutup Atap / HAL 309 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4
47 1 m1 Talang Vertikal Pralon D 2 1/2"

a. Bahan:
Pralon Ø 2 1/2" setara AW 0.2750 btg
Sambungan Pelengkap (15% harga pralon) 0.1000 ls
Lem PVC 0.0200 kg
b. Upah:
Tukang pipa 0.0750 hari
Mandor 0.0100 hari

47 1 m1 Talang Vertikal Pralon D 2 1/2"


48 1 m1 Talang Vertikal Pralon D 3"

a. Bahan:
Pralon Ø 3" setara AW 0.2750 btg
Sambungan Pelengkap (15% harga pralon) 0.1000 ls
Lem PVC 0.0200 kg
b. Upah:
Tukang pipa 0.0750 hari
Mandor 0.0100 hari

48 1 m1 Talang Vertikal Pralon D 3"


49 1 m1 Talang Vertikal Pralon d 4"

a. Bahan:
Pralon Ø 4" setara AW 0.2750 btg
Sambungan Pelengkap (15% harga pralon) 0.1000 ls
Lem PVC 0.0200 kg
b. Upah:
Tukang pipa 0.0750 hari
Mandor 0.0100 hari

49 1 m1 Talang Vertikal Pralon d 4"


50 1 lobangSparing Pralon d 1 1/2"

a. Bahan:
Pralon Ø 1 1/2" setara AW 0.0750 btg
Lem PVC 0.0010 kg
b. Upah:
Tukang pipa 0.0125 hari
Mandor 0.0006 hari

50 1 lobangSparing Pralon d 1 1/2"


51 1 lobangSparing Pralon d 2"

A.4.5.2. Penutup Atap / HAL 310 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4
a. Bahan:
Pralon Ø 2" setara AW 0.0750 btg
Lem PVC 0.0010 kg
b. Upah:
Tukang pipa 0.0125 hari
Mandor 0.0006 hari

51 1 lobangSparing Pralon d 2"

A.4.5.2. Penutup Atap / HAL 311 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4
52 1 lobangSparing Pralon d 2 1/2"

a. Bahan:
Pralon Ø 2 1/2" setara AW 0.0750 btg
Lem PVC 0.0010 kg
b. Upah:
Tukang pipa 0.0125 hari
Mandor 0.0006 hari

52 1 lobangSparing Pralon d 2 1/2"


53 1 lobangSparing Pralon d 3"

a. Bahan:
Pralon f 3" setara AW 0.0750 btg
Lem PVC 0.0010 kg
b. Upah:
Tukang pipa 0.0125 hari
Mandor 0.0006 hari

53 1 lobangSparing Pralon d 3"


54 1 lobangSparing Pralon d 4"

a. Bahan:
Pralon f 3" setara AW 0.0750 btg
Lem PVC 0.0010 kg
b. Upah:
Tukang pipa 0.0125 hari
Mandor 0.0006 hari

54 1 lobangSparing Pralon d 4"


55 1 m1 Talang jurai atau datar zincalume

a. Bahan:
zincalume t=0.50 1.1000 m1
b. Upah:
Tukang 0.1500 hari
Mandor 0.0350 hari

55 1 m1 Talang jurai atau datar zincalume


56 1 m2 Rangka atap baja ringan setara GIGA Steel

a. Bahan:
Baja ringan setara GIGA steel ( Terpasang ) 1.0000 m2

A.4.5.2. Penutup Atap / HAL 312 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4

56 1 m2 Rangka atap baja ringan setara GIGA Steel


57 1 m1 Pasang lisplank susun t=50cm calcium cilicate t=8mm rangka hollow
Bahan
Hollow 4 x 4 cm t=1.2mm 0.5000 btg
Drywall Screw 25mmX083 24.306 pc(s)
GRC t=80 0.174 lembar
Alat bantu 1.000 Ls
Tenaga Kerja
Tukang 0.4000 org/hr
Pekerja 0.4000 org/hr
Kepala Tukang 0.0400 org/hr
Mandor 0.0200 org/hr

57 1 m1 Pasang lisplank susun t=50cm calcium cilicate t=8mm rangka hollow

A.4.5.2. Penutup Atap / HAL 313 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4
58 1 m2 Pasang atap asphal Bitumen tipe Marathon 20
Bahan
Asphal Bitumen tipe Marathon 20 1.0000 lbr
Plywood 4" x 8" x 9 mm 0.350 lbr
Paku biasa genting 0.040 kg
Lem 0.100 tube
Paku biasa 2" - 5" 0.030 kg
Plasing dan bubungan 0.250 m2
Tenaga Kerja
Pekerja 0.2000 org/hr
Tukang 0.3000 org/hr
Kepala Tukang 0.0030 org/hr
Mandor 0.0100 org/hr

58 1 m2 Pasang atap asphal Bitumen tipe Marathon 20


59 1 m2 Pemasangan 1 m2 metal clading
a. Bahan:
Metal clading 1.0500 m2
Paku hak panjang 15 cm 0.0200 kg
b. Upah:
Pekerja 0.2000 hari
Tukang las 0.1000 hari
Kepala Tukang las 0.0100 hari
Mandor 0.0100 hari

59 1 m2 Pemasangan 1 m2 metal clading

60 1 m2 Pemasangan Floor metal deck BMT=0.80mm L=1m


a. Bahan:
Floor metal deck BMT=0.80mm L=1m 1.0500 m2
b. Upah:
Pekerja 0.2000 hari
Tukang las 0.1000 hari
Kepala Tukang las 0.0100 hari
Mandor 0.0100 hari

60 1 m2 Pemasangan Floor metal deck BMT=0.80mm L=1m

61 1 m2 Pemasangan rockwool density 100 kg/m3


1 Bahan
rockwool density 100 kg/m3 1.050 m2
roof mest galvanis 1.050 m2
Aluminium foil single wovwn 1.050 m2
2 Tenaga
Pekerja 0.100 oh
Tukang kayu 0.050 oh
Kepala tukang 0.005 oh
Mandor 0.008 oh

A.4.5.2. Penutup Atap / HAL 314 DARI 616


ANALISA BIAYA KONSTRUKSI SNI-BADAN STANDARDISASI NASIONAL 20

NO. URAIAN KOEF SATUAN

1 2 3 4

61 1 m2 Pemasangan rockwool density 100 kg/m3

A.4.5.2. Penutup Atap / HAL 315 DARI 616


N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7

269,870.59
256,495.80 269,320.59
27,500.00 550.00
47,786.20
89,320.00 893.20
137,445.00 13,744.50
157,850.00 31,570.00
157,850.00 1,578.50
Jumlah 317,656.79
Overhead & keuntungan 10% : 31,765.68
Jumlah : 349,422.47
Dibulatkan : 349,400.00

300,288.34
280,750.80 294,788.34
27,500.00 5,500.00
47,786.20
89,320.00 893.20
137,445.00 13,744.50
157,850.00 31,570.00
157,850.00 1,578.50
Jumlah 348,074.54
Overhead & keuntungan 10% : 34,807.45
Jumlah : 382,881.99
Dibulatkan : 382,800.00

605,408.49
576,055.70 604,858.49
27,500.00 550.00
118,691.65
89,320.00 13,398.00
137,445.00 103,083.75
157,850.00 1,262.80
157,850.00 947.10
Jumlah 724,100.14
Overhead & keuntungan 10% : 72,410.01
Jumlah : 796,510.15
Dibulatkan : 796,500.00

1,100.00
-
27,500.00 1,100.00
170,054.50
89,320.00 8,932.00
137,445.00 137,445.00
157,850.00 15,785.00
157,850.00 7,892.50
Jumlah 171,154.50
Overhead & keuntungan 10% : 17,115.45
A.4.5.2. Penutup Atap / HAL 316 DARI 616
N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7
Jumlah : 188,269.95
Dibulatkan : 188,200.00

127,420.04
105,266.70 126,320.04
27,500.00 1,100.00
170,054.50
89,320.00 8,932.00
137,445.00 137,445.00
157,850.00 15,785.00
157,850.00 7,892.50

Jumlah 297,474.54
Overhead & keuntungan 10% : 29,747.45
Jumlah : 327,221.99
Dibulatkan : 327,200.00

A.4.5.2. Penutup Atap / HAL 317 DARI 616


N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7

100,787.72
83,073.10 99,687.72
27,500.00 1,100.00
170,054.50
89,320.00 8,932.00
137,445.00 137,445.00
157,850.00 15,785.00
157,850.00 7,892.50

Jumlah 270,842.22
Overhead & keuntungan 10% : 27,084.22
Jumlah : 297,926.44
Dibulatkan : 297,900.00
/sisalation Setara Primary Smart Foam 6.5 mm
162,484.25

154,746.90 162,484.25
17,856.30
89,320.00 8,932.00
137,445.00 6,872.25
157,850.00 789.25
157,850.00 1,262.80

Jumlah 180,340.55
Overhead & keuntungan 10% : 18,034.05
Jumlah : 198,374.60
/sisalation Setara Primary Smart Foam 6.5 mm Dibulatkan : 198,300.00

248,309.99
236,485.70 248,309.99
17,856.30
89,320.00 8,932.00
137,445.00 6,872.25
157,850.00 789.25
157,850.00 1,262.80

Jumlah 266,166.29
Overhead & keuntungan 10% : 26,616.63
Jumlah : 292,782.91
Dibulatkan : 292,700.00

71,975.20
242,880.00 66,792.00
36,432.00 3,643.20
77,000.00 1,540.00
11,886.88
137,445.00 10,308.38
157,850.00 1,578.50

Jumlah 83,862.08
Overhead & keuntungan 10% : 8,386.21
Jumlah : 92,248.28
Dibulatkan : 92,200.00

A.4.5.2. Penutup Atap / HAL 318 DARI 616


N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7
101,068.00
343,200.00 94,380.00
51,480.00 5,148.00
77,000.00 1,540.00
11,886.88
137,445.00 10,308.38
157,850.00 1,578.50

Jumlah 112,954.88
Overhead & keuntungan 10% : 11,295.49
Jumlah : 124,250.36
Dibulatkan : 124,200.00

A.4.5.2. Penutup Atap / HAL 319 DARI 616


N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7

142,920.80
487,520.00 134,068.00
73,128.00 7,312.80
77,000.00 1,540.00
11,886.88
137,445.00 10,308.38
157,850.00 1,578.50

Jumlah 154,807.68
Overhead & keuntungan 10% : 15,480.77
Jumlah : 170,288.44
Dibulatkan : 170,200.00

200,596.00
686,400.00 188,760.00
102,960.00 10,296.00
77,000.00 1,540.00
11,886.88
137,445.00 10,308.38
157,850.00 1,578.50

Jumlah 212,482.88
Overhead & keuntungan 10% : 21,248.29
Jumlah : 233,731.16
Dibulatkan : 233,700.00

277,666.40
952,160.00 261,844.00
142,824.00 14,282.40
77,000.00 1,540.00
11,886.88
137,445.00 10,308.38
157,850.00 1,578.50

Jumlah 289,553.28
Overhead & keuntungan 10% : 28,955.33
Jumlah : 318,508.60
Dibulatkan : 318,500.00

18,293.00
242,880.00 18,216.00
77,000.00 77.00
1,816.72
137,445.00 1,718.06
157,850.00 98.66

Jumlah 20,109.72
Overhead & keuntungan 10% : 2,010.97
Jumlah : 22,120.69
Dibulatkan : 22,100.00

A.4.5.2. Penutup Atap / HAL 320 DARI 616


N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7
25,817.00
343,200.00 25,740.00
77,000.00 77.00
1,816.72
137,445.00 1,718.06
157,850.00 98.66

Jumlah 27,633.72
Overhead & keuntungan 10% : 2,763.37
Jumlah : 30,397.09
Dibulatkan : 30,300.00

A.4.5.2. Penutup Atap / HAL 321 DARI 616


N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7

36,641.00
487,520.00 36,564.00
77,000.00 77.00
1,816.72
137,445.00 1,718.06
157,850.00 98.66

Jumlah 38,457.72
Overhead & keuntungan 10% : 3,845.77
Jumlah : 42,303.49
Dibulatkan : 42,300.00

51,557.00
686,400.00 51,480.00
77,000.00 77.00
1,816.72
137,445.00 1,718.06
157,850.00 98.66

Jumlah 53,373.72
Overhead & keuntungan 10% : 5,337.37
Jumlah : 58,711.09
Dibulatkan : 58,700.00

71,489.00
952,160.00 71,412.00
77,000.00 77.00
1,816.72
137,445.00 1,718.06
157,850.00 98.66

Jumlah 73,305.72
Overhead & keuntungan 10% : 7,330.57
Jumlah : 80,636.29
Dibulatkan : 80,600.00

82,885.00
75,350.00 82,885.00
26,141.50
137,445.00 20,616.75
157,850.00 5,524.75

Jumlah 109,026.50
Overhead & keuntungan 10% : 10,902.65
Jumlah : 119,929.15
Dibulatkan : 119,900.00

159,500.00
159,500.00 159,500.00

Jumlah 159,500.00
A.4.5.2. Penutup Atap / HAL 322 DARI 616
N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7
Overhead & keuntungan 10% : 15,950.00
Jumlah : 175,450.00
Dibulatkan : 175,400.00
m calcium cilicate t=8mm rangka hollow
75,533.68
55,990.00 27,995.00
83.60 2,031.95
205,370.00 35,654.51
9,852.22 9,852.22
100,177.00
137,445.00 54,978.00
89,320.00 35,728.00
157,850.00 6,314.00
157,850.00 3,157.00
Jumlah 175,710.68
Overhead & keuntungan 10% : 17,571.07
Jumlah : 193,281.75
m calcium cilicate t=8mm rangka hollow Dibulatkan : 193,200.00

A.4.5.2. Penutup Atap / HAL 323 DARI 616


N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7

375,008.12
250,000.00 250,000.00
123,863.00 43,352.05
60,000.00 2,400.00
127,000.00 12,700.00
23,294.00 698.82
263,429.00 65,857.25
56,337.05
137,445.00 27,489.00
89,320.00 26,796.00
157,850.00 473.55
157,850.00 1,578.50
Jumlah 431,345.17
Overhead & keuntungan 10% : 64,336.97
Jumlah : 495,682.14
Dibulatkan : 495,600.00

173,800.00
165,000.00 173,250.00
27,500.00 550.00
47,786.20
157,850.00 31,570.00
137,445.00 13,744.50
89,320.00 893.20
157,850.00 1,578.50

Jumlah 221,586.20
Overhead & keuntungan 10% : 22,158.62
Jumlah : 243,744.82
Dibulatkan : 243,700.00

147,000.00
140,000.00 147,000.00
47,786.20
157,850.00 31,570.00
137,445.00 13,744.50
89,320.00 893.20
157,850.00 1,578.50

Jumlah 194,786.20
Overhead & keuntungan 10% : 19,478.62
Jumlah : 214,264.82
Dibulatkan : 214,200.00

107,368.80
82,500.00 86,625.00
14,806.00 15,546.30
4,950.00 5,197.50
17,856.30
89,320.00 8,932.00
137,445.00 6,872.25
157,850.00 789.25
157,850.00 1,262.80

A.4.5.2. Penutup Atap / HAL 324 DARI 616


N STANDARDISASI NASIONAL 2008 EDIT 2012
HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.

5 6 7

Jumlah 125,225.10
Overhead & keuntungan 10% : 12,522.51
Jumlah : 137,747.61
Dibulatkan : 137,700.00

A.4.5.2. Penutup Atap / HAL 325 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

A.4.6.1 PEKERJAAN KAYU


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan

1 1 m³ Membuat & memasang Kusen Pintu dan Kusen Jendela.Kayu Kelas I


Bahan
Balok Kayu Jati Kelas I 1.1000 m³
Paku 10 cm 1.2500 kg
Lem Kayu 1.0000 kg
Tenaga Kerja
Pekerja 7.0000 org/hr
Tukang Kayu 21.0000 org/hr
Kepala Tukang 2.1000 org/hr
Mandor 0.3500 org/hr

1.00 1 m³ Membuat & memasang Kusen Pintu dan Kusen Jendela.Kayu Kelas I

2 1 m³ Membuat & memasang Kusen Pintu dan Kusen Jendela. Kayu Kelas II & III
Bahan
Balok Kayu Kmape Samarinda 1.2000 m³
Paku 10 cm 1.2500 kg
Lem Kayu 1.0000 kg
Tenaga Kerja
Pekerja 6.0000 org/hr
Tukang Kayu 18.0000 org/hr
Kepala Tukang 1.8000 org/hr
Mandor 0.3000 org/hr

2 1 m³ Membuat & memasang Kusen Pintu dan Kusen Jendela. Kayu Kelas II & III

3 1 m2 Membuat & memasang Pintu Klamp Standart. Kayu Kelas II


Bahan
Papan Kayu Kamper Samarinda 0.0400 m³
Paku 5cm -7 cm 0.0500 kg
Tenaga Kerja
Pekerja 0.3500 org/hr
Tukang Kayu 1.0500 org/hr
Kepala Tukang 0.1050 org/hr
Mandor 0.0180 org/hr

3 1 m2 Membuat & memasang Pintu Klamp Standart. Kayu Kelas II

4 1 m2 Membuat & memasang Pintu Klamp sederhana. Kayu Kelas III gudang sementar
Bahan
Papan Kayu Borneo 0.0400 m³
Paku 5cm -7 cm 0.0500 kg
Tenaga Kerja
Pekerja 0.3500 org/hr
Tukang Kayu 1.0500 org/hr
Kepala Tukang 0.1050 org/hr
A.4.6.1.Pek.Kayu / HAL 326 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

Mandor 0.0180 org/hr

4 1 m2 Membuat & memasang Pintu Klamp sederhana. Kayu Kelas III gudang sementar

5 1 m2 Membuat & memasang Daun Pintu Panel.Kayu Kamper Samarinda Kelas II


Bahan
Papan Kayu Kamper Samarinda 0.0400 m³
Lem Kayu 0.5000 kg
Tenaga Kerja
Pekerja 1.0000 org/hr
Tukang Kayu 3.0000 org/hr
Kepala Tukang 0.3000 org/hr
Mandor 0.0500 org/hr

5 1 m2 Membuat & memasang Daun Pintu Panel.Kayu Kamper Samarinda Kelas II

A.4.6.1.Pek.Kayu / HAL 327 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

6 1 m2 Membuat & memasang Pintu dan Jendela Kaca. Kayu Kelas I


Bahan
Papan Kayu jati 0.0240 m³
Lem Kayu 0.3000 kg
Tenaga Kerja
Pekerja 0.8000 org/hr
Tukang Kayu 2.4000 org/hr
Kepala Tukang 0.2400 org/hr
Mandor 0.0400 org/hr

6 1 m2 Membuat & memasang Pintu dan Jendela Kaca. Kayu Kelas I

6a 1 m2 Membuat & memasang Pintu dan Jendela Kaca.Kayu Kamper Samarinda Kelas I
Bahan
Papan Kayu 0.0240 m³
Lem Kayu 0.3000 kg
Tenaga Kerja
Pekerja 0.8000 org/hr
Tukang Kayu 2.4000 org/hr
Kepala Tukang 0.2400 org/hr
Mandor 0.0400 org/hr

6a 1 m2 Membuat & memasang Pintu dan Jendela Kaca.Kayu Kamper Samarinda Kelas I

7 1 m2 Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kelas I & II
Bahan
Papan Kayu Jati 0.0640 m³
Lem Kayu 0.5000 kg
Tenaga Kerja
Pekerja 1.0000 org/hr
Tukang Kayu 3.0000 org/hr
Kepala Tukang 0.3000 org/hr
Mandor 0.0500 org/hr

7 1 m2 Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kelas I & II

7a 1 m2 Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kamper Samarinda
Bahan
Papan Kayu Kamper Samarinda 0.0640 m³
Lem Kayu 0.5000 kg
Tenaga Kerja
Pekerja 1.0000 org/hr
Tukang Kayu 3.0000 org/hr
Kepala Tukang 0.3000 org/hr
Mandor 0.0500 org/hr

7a 1 m2 Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kamper Samarinda

A.4.6.1.Pek.Kayu / HAL 328 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

8 1 m2 Membuat & memasang Daun Pintu Kayu Lapis (Plywood) Rangkap.Rangka Tertu
Bahan
Papan Kayu Kamper Samarinda 0.0250 m³
Paku 1 cm - 2.5 cm 0.0300 kg
Lem Kayu 0.5000 kg
Plywood Tebal 4mm Uk.90x220cm 1.0000 Lembar
Tenaga Kerja
Pekerja 0.7000 org/hr
Tukang Kayu 2.1000 org/hr
Kepala Tukang 0.2100 org/hr
Mandor 0.0350 org/hr

8 1 m2 Membuat & memasang Daun Pintu Kayu Lapis (Plywood) Rangkap.Rangka Tertu

A.4.6.1.Pek.Kayu / HAL 329 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

9 1 m2 Membuat & memasang Pintu Plywood Rangkap.Rangka Expose Kayu Kamper S


Bahan
Papan Kaamper Samarinda 0.0256 m³
Paku 1 cm - 2.5 cm 0.0300 kg
Lem Kayu 0.5000 kg
Plywood Tebal 4mm Uk.90x220cm 1.0000 Lembar
Tenaga Kerja
Pekerja 0.8000 org/hr
Tukang Kayu 2.4000 org/hr
Kepala Tukang 0.2400 org/hr
Mandor 0.0400 org/hr

9 1 m2 Membuat & memasang Pintu Plywood Rangkap.Rangka Expose Kayu Kamper S

10 1 m2 Pasang Jalusi Kusen. Kayu Kamper Samarinda


Bahan
Papan Kayu 0.0600 m³
Paku 1 cm - 2.5 cm 0.1500 kg
Tenaga Kerja
Pekerja 0.6700 org/hr
Tukang Kayu 2.0000 org/hr
Kepala Tukang 0.2000 org/hr
Mandor 0.3350 org/hr

10 1 m2 Pasang Jalusi Kusen. Kayu Kamper Samarinda

29 1 m1 Cope lampu kayu Kamper Samarinda finish cat Duco

1. Bahan : - Cope lampu kayu Kamper Samarinda 2x20 cm 0.010 m3

2. Upah : - Tukang kayu 0.250 hari


- Pekerja 0.125 hari
- Kepala tukang 0.025 hari
- Mandor 0.013 hari

3. Terpasang : Cat Kayu/besi Duco non keuntungan 0.400 m2

29 1 m1 Cope lampu kayu Kamper Samarinda finish cat Duco


30 1 m1 Plin kayu kamper Samarinda ukuran 10 x 100mm finish melamik

1. Bahan : - Papan kayu Kamper Samarinda 2x10 cm 0.002 m3

2. Upah : - Tukang kayu 0.213 hari


- Pekerja 0.106 hari
- Kepala tukang 0.021 hari
- Mandor 0.011 hari

A.4.6.1.Pek.Kayu / HAL 330 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

3. Terpasang : Finish Melamik 0.144 m2

30 1 m1 Plin kayu kamper Samarinda ukuran 10 x 100mm finish melamik

A.4.6.1.Pek.Kayu / HAL 331 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

31 1 m' Pasang dan pembuatan meja Counter Nurse station ukuran yang dihitung
2.12 10.960
1. Bahan : - Rangka multiplek 15mm meranti 17.577 lbr
- Rangka multiplek 12mm meranti 1.706 lbr
- MDF 3,5mm 21.350 lbr
- HPL 21.350 lbr
- lem kayu putih 1.913 kg
- lem kayu kuning 19.955 kg
- Paku skrup 3.515 kg
- Rel laci/Drawer Runner 4.000 bh
- Handle laci stainless steel 2.000 bh
- Surfaces 20.550 m2
- Wall bar tipe WG-5C setara Fawling 13.700 m1
- Pelat Stainless stell Hairline 1.390 m2

2. Upah : - Tukang kayu 31.019 hari


- Pekerja 15.509 hari
- Kepala tukang 3.102 hari
- Mandor 1.551 hari

31 1unit Pasang dan pembuatan meja Counter Nurse station


31 1 m' Pasang dan pembuatan meja Counter Nurse station

A.4.6.1.Pek.Kayu / HAL 332 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

intu dan Kusen Jendela.Kayu Kelas I


41,552.50
- -
18,370.00 22,962.50
18,590.00 18,590.00
3,898,317.50
89,320.00 625,240.00
137,445.00 2,886,345.00
157,850.00 331,485.00
157,850.00 55,247.50
Jumlah 3,939,870.00
Overhead & keuntungan 10% : 393,987.00
Jumlah : 4,333,857.00
intu dan Kusen Jendela.Kayu Kelas I Dibulatkan : 4,333,800.00

intu dan Kusen Jendela. Kayu Kelas II & III


4,039,964.50
3,332,010.00 3,998,412.00
18,370.00 22,962.50
18,590.00 18,590.00
3,341,415.00
89,320.00 535,920.00
137,445.00 2,474,010.00
157,850.00 284,130.00
157,850.00 47,355.00
Jumlah 7,381,379.50
Overhead & keuntungan 10% : 738,137.95
Jumlah : 8,119,517.45
intu dan Kusen Jendela. Kayu Kelas II & III Dibulatkan : 8,119,500.00

134,198.90
3,332,010.00 133,280.40
18,370.00 918.50
194,994.80
89,320.00 31,262.00
137,445.00 144,317.25
157,850.00 16,574.25
157,850.00 2,841.30
Jumlah 329,193.70
Overhead & keuntungan 10% : 32,919.37
Jumlah : 362,113.07
Dibulatkan : 362,100.00

amp sederhana. Kayu Kelas III gudang sementara


107,688.90
2,669,260.00 106,770.40
18,370.00 918.50
194,994.80
89,320.00 31,262.00
137,445.00 144,317.25
157,850.00 16,574.25
A.4.6.1.Pek.Kayu / HAL 333 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

157,850.00 2,841.30
Jumlah 302,683.70
Overhead & keuntungan 10% : 30,268.37
Jumlah : 332,952.07
amp sederhana. Kayu Kelas III gudang sementara Dibulatkan : 332,900.00

ntu Panel.Kayu Kamper Samarinda Kelas II


142,575.40
3,332,010.00 133,280.40
18,590.00 9,295.00
556,902.50
89,320.00 89,320.00
137,445.00 412,335.00
157,850.00 47,355.00
157,850.00 7,892.50
Jumlah 699,477.90
Overhead & keuntungan 10% : 69,947.79
Jumlah : 769,425.69
ntu Panel.Kayu Kamper Samarinda Kelas II Dibulatkan : 769,400.00

A.4.6.1.Pek.Kayu / HAL 334 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

905,577.00
37,500,000.00 900,000.00
18,590.00 5,577.00
445,522.00
89,320.00 71,456.00
137,445.00 329,868.00
157,850.00 37,884.00
157,850.00 6,314.00
Jumlah 1,351,099.00
Overhead & keuntungan 10% : 135,109.90
Jumlah : 1,486,208.90
Dibulatkan : 1,486,200.00

n Jendela Kaca.Kayu Kamper Samarinda Kelas II


85,545.24
3,332,010.00 79,968.24
18,590.00 5,577.00
445,522.00
89,320.00 71,456.00
137,445.00 329,868.00
157,850.00 37,884.00
157,850.00 6,314.00
Jumlah 531,067.24
Overhead & keuntungan 10% : 53,106.72
Jumlah : 584,173.96
n Jendela Kaca.Kayu Kamper Samarinda Kelas II Dibulatkan : 584,100.00

2,409,295.00
37,500,000.00 2,400,000.00
18,590.00 9,295.00
556,902.50
89,320.00 89,320.00
137,445.00 412,335.00
157,850.00 47,355.00
157,850.00 7,892.50
Jumlah 2,966,197.50
Overhead & keuntungan 10% : 296,619.75
Jumlah : 3,262,817.25
Dibulatkan : 3,262,800.00

n Jendela Jalusi. Kayu Kamper Samarinda


222,543.64
3,332,010.00 213,248.64
18,590.00 9,295.00
556,902.50
89,320.00 89,320.00
137,445.00 412,335.00
157,850.00 47,355.00
157,850.00 7,892.50
Jumlah 779,446.14
Overhead & keuntungan 10% : 77,944.61
Jumlah : 857,390.75
n Jendela Jalusi. Kayu Kamper Samarinda Dibulatkan : 857,300.00

A.4.6.1.Pek.Kayu / HAL 335 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

ntu Kayu Lapis (Plywood) Rangkap.Rangka Tertutup Kayu Kamper (lebar Sampai 90 cm)
236,146.35
3,332,010.00 83,300.25
18,370.00 551.10
18,590.00 9,295.00
143,000.00 143,000.00
389,831.75
89,320.00 62,524.00
137,445.00 288,634.50
157,850.00 33,148.50
157,850.00 5,524.75
Jumlah 625,978.10
Overhead & keuntungan 10% : 62,597.81
Jumlah : 688,575.91
ntu Kayu Lapis (Plywood) Rangkap.Rangka Tertutup Kayu Dibulatkan : 688,500.00

A.4.6.1.Pek.Kayu / HAL 336 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

ywood Rangkap.Rangka Expose Kayu Kamper Samarinda


238,145.56
3,332,010.00 85,299.46
18,370.00 551.10
18,590.00 9,295.00
143,000.00 143,000.00
445,522.00
89,320.00 71,456.00
137,445.00 329,868.00
157,850.00 37,884.00
157,850.00 6,314.00
Jumlah 683,667.56
Overhead & keuntungan 10% : 68,366.76
Jumlah : 752,034.31
ywood Rangkap.Rangka Expose Kayu Kamper Samarind Dibulatkan : 752,000.00

202,676.10
3,332,010.00 199,920.60
18,370.00 2,755.50
419,184.15
89,320.00 59,844.40
137,445.00 274,890.00
157,850.00 31,570.00
157,850.00 52,879.75
Jumlah 621,860.25
Overhead & keuntungan 10% : 62,186.03
Jumlah : 684,046.28
Dibulatkan : 684,000.00

10,245,890.00 98,360.54 98,360.54

137,445.00 34,361.25 51,445.63


89,320.00 11,165.00
157,850.00 3,946.25
157,850.00 1,973.13

250,000.00 100,000.00 100,000.00


Jumlah 249,806.17
Overhead & keuntungan 10% : 24,980.62
Jumlah : 274,786.79
Dibulatkan : 274,700.00

10,245,890.00 24,590.14 24,590.14

137,445.00 29,207.06 43,728.78


89,320.00 9,490.25
157,850.00 3,354.31
157,850.00 1,677.16

Jumlah 68,318.92
A.4.6.1.Pek.Kayu / HAL 337 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Overhead & keuntungan 10% : 6,831.89


267,550.00 38,527.20
Jumlah : 113,678.01
Dibulatkan : 113,600.00

A.4.6.1.Pek.Kayu / HAL 338 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

ukuran yang dihitung 800x13700mm

216,590.00 3,807,080.08 51,841,373.36


231,330.00 394,657.71
40,000.00 854,009.75
200,103.20 4,272,252.09
18,590.00 35,559.51
21,222.30 423,501.01
18,370.00 64,579.22
150,000.00 600,000.00
125,000.00 250,000.00
1,450,000.00 29,797,500.00
799,385.00 10,951,574.50
281,050.00 390,659.50

137,445.00 4,263,388.30 6,383,140.19


89,320.00 1,385,302.64
157,850.00 489,632.83
157,850.00 244,816.42

Jumlah 58,224,513.54
Overhead & keuntungan 10% : 5,822,451.35
Jumlah Harga : 64,046,964.90
Dibulatkan harga m1 : 64,046,900.00
Dibulatkan harga m1 : 4,674,900.00

A.4.6.1.Pek.Kayu / HAL 339 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
1 1 set Kunci pintu tanam antik umum dobel slaght setara mutu menengah
2 1 set Kunci pintu tanam antik umum dobel slaght setara mutu biasa
3 1 set Kunci pintu kamar mandi
4 1 set Pemasangan 1 buah kunci silinder
4a 1 set Mortice Lock tipe Art 1490.55 + Double Cylinder Type Art
1400.60( untuk pintu engkel )
Bahan : Mortice Lock tipe Art 1490.55 ( untuk pintu engkel ) 1.0000 bh
Double Cylinder Type Art 1400.60 1.0000 bh
Upah : Pekerja 0.005 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.0025 hari

### Overhead & keuntungan 1


4a 1 set Mortice Lock tipe Art 1490.55 + Double Cylinder Type Art 1400.60( untuk
Jumlah
pintu& pembulat
4b 1 set Mortice Lock tipe Art 1452.55 + Double Cylinder Type Art
1400.60 ( untuk pintu dobel )
Bahan : Mortice Lock tipe Art 1452.30 ( untuk pintu dobel ) 1.0000 bh
Double Cylinder Type Art 1400.60 1.0000 bh
Upah : Pekerja 0.005 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


4b 1 set Mortice Lock tipe Art 1452.55 + Double Cylinder Type Art 1400.60 ( untuk
Jumlah
pintu& pembulat
4c 1 set Mortice Lock tipe Art 1450.55 + Double Cylinder Type Art
1400.60 ( untuk pintu geser )
Bahan : Mortice Lock tipe Art 1450.55 ( untuk pintu geser ) 1.0000 bh
Double Cylinder Type Art 1400.60 1.0000 bh
Upah : Pekerja 0.005 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


4c 1 set Mortice Lock tipe Art 1450.55 + Double Cylinder Type Art 1400.60 ( untuk
Jumlah
pintu& pembulat
4d 1 set Mortice Lock tipe Art 1490.55 + Double cylinder tipe Art
1477.60 ( untuk pintu Toilet )
Bahan : Mortice Lock tipe Art 1490.55 ( untuk pintu engkel ) 1.0000 bh
Double Cylinder WC Type Art 1477.60 (untuk toilet) 1.0000 bh
Upah : Pekerja 0.005 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


4d 1 set Mortice Lock tipe Art 1490.55 + Double cylinder tipe Art 1477.60 ( untuk
Jumlah
pintu T
& pembulat
4e 1 psg Lever Handle ART 306 SS

A.4.6.2 Kunci & Kaca / HAL 340 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
Bahan : Lever Handle ART 306 SS 1.0000 set
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


4e 1 psg Lever Handle ART 306 SS Jumlah & pembulat
4f 1 psg Lever Handle ART 352 SS
Bahan : Lever Handle ART 352 SS 1.0000 set
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


4f 1 psg Lever Handle ART 352 SS Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 341 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
4g 1 Psg Pull Handle tipe Art GD 9330 SS-350

Bahan : Pull Handle tipe Art GD 9330 SS-350 1.0000 Psg


Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.050 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


4g 1 Psg Pull Handle tipe Art GD 9330 SS-350 Jumlah & pembulat
4h 1 Psg Pull Handle tipe Art PH 2296 G-600

Bahan : Pull Handle tipe Art PH 2296 G-600 1.0000 Psg


Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.050 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


4h 1 Psg Pull Handle tipe Art PH 2296 G-600 Jumlah & pembulat
4i 1 Psg Flush Handle ( untuk pintu geser ) tipe Art FH 216
Bahan : Flush Handle ( untuk pintu geser ) tipe Art FH 216 2.0000 bh
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.050 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


4i 1 Psg Flush Handle ( untuk pintu geser ) tipe Art FH 216 Jumlah & pembulat
4j 1 Psg Push Pull Art- Arrow 8-1 SS
Bahan : Push Pull Art- Arrow 8-1 SS 2.0000 bh
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.050 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


4j 1 Psg Push Pull Art- Arrow 8-1 SS Jumlah & pembulat
4k 1 Psg Pull Handle tipe Art PH 243 L-1200

Bahan : Pull Handle tipe Art PH 243 L-1200 1.0000 Psg


Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.050 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


4k 1 Psg Pull Handle tipe Art PH 243 L-1200 Jumlah & pembulat
4l 1 Psg Pull Handle tipe Art PH 243 A-350

Bahan : Pull Handle tipe Art PH 243 A-350 1.0000 Psg


A.4.6.2 Kunci & Kaca / HAL 342 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.050 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


4l 1 Psg Pull Handle tipe Art PH 243 A-350 Jumlah & pembulat
5 1 bh Hinges Gracia Art 2201 tipe BB 4"x3"x3mm SS
Bahan : Hinges Gracia Art 2201 tipe BB 4"x3"x3mm SS 1.0000 bh
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.0008 hari

Overhead & keuntungan 1


5 1 bh Hinges Gracia Art 2201 tipe BB 4"x3"x3mm SS Jumlah & pembulat
5a 1 bh Hinges Gracia Art 2301 tipe 3"x2.5"x2mm SS
Bahan : Hinges Gracia Art 2301 tipe 3"x2.5"x2mm SS ( Untuk pintu shapt 1.0000 bh
Upah : Pekerja 0.011 hari
Tukang kayu 0.113 hari
Kepala tukang 0.011 hari
Mandor 0.00056 hari

Overhead & keuntungan 1


5a 1 bh Hinges Gracia Art 2301 tipe 3"x2.5"x2mm SS Jumlah & pembulat

6 1 set Pemasangan 1 buah engsel jendela kupu-kupu

7 1 set Pemasangan 1 buah engsel angin

7a 1 psg Frictionstay top hung tipe 8"/MM2


Bahan : Frictionstay top hung tipe 8"/MM2 1.000 psg
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


7a 1 psg Frictionstay top hung tipe 8"/MM2 Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 343 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
7b 1 psg Frictionstay top hung tipe 12"/MM2
Bahan : Friction stay top hung tipe 12"/2mm 1.000 psg
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


7b 1 psg Frictionstay top hung tipe 12"/MM2 Jumlah & pembulat
7c 1 psg Frictionstay top hung tipe 20"/MM2
Bahan : Friction stay top hung tipe 20"/2mm 1.000 psg
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


7c 1 psg Frictionstay top hung tipe 20"/MM2 Jumlah & pembulat
7d 1 psg Frictionstay top hung tipe 24"/MM2
Bahan : Friction stay top hung tipe 24"/2,5mm 1.000 psg
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


7d 1 psg Frictionstay top hung tipe 24"/MM2 Jumlah & pembulat

8 1 set Pemasangan 1 buah spring knip

9 1 set Pemasangan 1 buah kait angin

10 1 set Door closer tipe 300 EN-4 complete


Bahan : Door closer tipe TS 1M RA Dorma 1.000 set
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.050 hari
Mandor 0.0030 hari

Overhead & keuntungan 1


10 1 set Door closer tipe 300 EN-4 complete Jumlah & pembulat

11 1 set Pemasangan 1 buah kait angin

11a 1 Psg Fushbolt tipe Rioby 456/250 mm Silver


Bahan : Fushbolt tipe Rioby 456/250 mm Silver 1.0000 psg
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.050 hari
Mandor 0.0025 hari

A.4.6.2 Kunci & Kaca / HAL 344 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA

Overhead & keuntungan 1


11a 1 Psg Fushbolt tipe Rioby 456/250 mm Silver Jumlah & pembulat
11b 1 bh Window lock Gracia Locking tipe Art 120
Bahan : Window lock Gracia Locking tipe Art 120 ( untuk jendela alumuni 1.0000 bh
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


11b 1 bh Window lock Gracia Locking tipe Art 120 Jumlah & pembulat

12 1 set Pemasangan 1 buah door holder

12a 1 bh Dust Proof Strike Gracia tipe 115D


Bahan : Dust Proof Strike Gracia tipe 115D 1.0000 bh
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


12a 1 bh Dust Proof Strike Gracia tipe 115D Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 345 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
13 1 Psg Door stop Gracia tipe Art 604 ( Floor )
Bahan : Door stop Gracia tipe Art 604/40mm SS. ( Floor ) 1.0000 bh
Upah : Pekerja 0.010 hari
Tukang kayu 0.100 hari
Kepala tukang 0.010 hari
Mandor 0.0005 hari

Overhead & keuntungan 1


13 1 Psg Door stop Gracia tipe Art 604 ( Floor ) Jumlah & pembulat
13a 1 Psg Door stop Gracia tipe Art 713 ( Wall )
Bahan : Door stop Gracia tipe Art 729 ( Wall ) Silver 1.0000 Psg
Upah : Pekerja 0.010 hari
Tukang kayu 0.100 hari
Kepala tukang 0.010 hari
Mandor 0.0005 hari

Overhead & keuntungan 1


13a 1 Psg Door stop Gracia tipe Art 713 ( Wall ) Jumlah & pembulat
13b 1 set Door Selector Art- N250 SS
Bahan : Door Selector Art- N250 SS 1.0000 set
Upah : Pekerja 0.060 hari
Tukang kayu 0.600 hari
Kepala tukang 0.060 hari
Mandor 0.003 hari

Overhead & keuntungan 1


13b 1 set Door Selector Art- N250 SS Jumlah & pembulat
14 1 set Track Sliding setara Calfis SD 100/2 Mtr
Bahan : Track Sliding setara Calfis SD 100/2 Mtr 1.0000 Btg
Upah : Pekerja 0.060 hari
Tukang kayu 0.600 hari
Kepala tukang 0.060 hari
Mandor 0.003 hari

Overhead & keuntungan 1


14 1 set Track Sliding setara Calfis SD 100/2 Mtr Jumlah & pembulat
14a 1 set Track Sliding setara Calfis SD 100/3 Mtr
Bahan : Track Sliding setara Calfis SD 100/3 Mtr 1.0000 Btg
Upah : Pekerja 0.060 hari
Tukang kayu 0.600 hari
Kepala tukang 0.060 hari
Mandor 0.003 hari

Overhead & keuntungan 1


14a 1 set Track Sliding setara Calfis SD 100/3 Mtr Jumlah & pembulat
14b 1 set Channel setara Calfis CL 500/2 Mtr
Bahan : Channel setara Calfis CL 500/2 Mtr 1.0000 Btg
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
A.4.6.2 Kunci & Kaca / HAL 346 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
Mandor 0.008 hari

Overhead & keuntungan 1


14b 1 set Channel setara Calfis CL 500/2 Mtr Jumlah & pembulat
14c 1 set Channel setara Calfis CL 500/3 Mtr
Bahan : Channel setara Calfis CL 500/3 Mtr 1.0000 Btg
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


14c 1 set Channel setara Calfis CL 500/3 Mtr Jumlah & pembulat
14d 1 set Roda Sliding Calfis SD 120 max 100Kg
Bahan : Roda Sliding Calfis SD 120 max 100Kg 1.0000 set
Upah : Pekerja 0.060 hari
Tukang kayu 0.600 hari
Kepala tukang 0.060 hari
Mandor 0.003 hari

Overhead & keuntungan 1


14d 1 set Roda Sliding Calfis SD 120 max 100Kg Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 347 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
14e 1 set Bracket setara Calfis BK 110
Bahan : Bracket setara Calfis BK 110 1.0000 set
Upah : Pekerja 0.0025 hari
Tukang kayu 0.0250 hari
Kepala tukang 0.0025 hari
Mandor 0.0013 hari

Overhead & keuntungan 1


14e 1 set Bracket setara Calfis BK 110 Jumlah & pembulat

15 1 set Pemasangan 1 buah kunci lemari

15a 1 set Floor hinge BTS 65 Complete termasuk top pivot


Bahan : Floor hinge BTS 65 Complete termasuk top pivot 1.0000 set
Upah : Pekerja 0.060 hari
Tukang kayu 0.600 hari
Kepala tukang 0.060 hari
Mandor 0.003 hari

Overhead & keuntungan 1


15a 1 set Floor hinge BTS 65 Complete termasuk top pivot Jumlah & pembulat
15b 1 set Floor hinge BTS 84 Complete (untuk pintu kaca & alumunium)
Bahan : Floor hinge BTS 84 Complete (untuk pintu kaca & alumunium) 1.0000 set
Upah : Pekerja 0.060 hari
Tukang kayu 0.600 hari
Kepala tukang 0.060 hari
Mandor 0.003 hari

Overhead & keuntungan 1


15b 1 set Floor hinge BTS 84 Complete (untuk pintu kaca & alumunium) Jumlah & pembulat
15c 1 Set Top Fact fitting PT-20, Bottom Fact fitting PT-10, Corner Lock PT - 10 LCK
Bahan : Top Fact fitting PT-20, Bottom Fact fitting PT-10, Corner Lock P 1.0000 set
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.003 hari

Overhead & keuntungan 1


15c 1 Set Top Fact fitting PT-20, Bottom Fact fitting PT-10, Corner Lock PT - 10 LCK
Jumlah & pembulat
15d 1 Set Top Fact fitting Pt-40
Bahan : Fact fitting Pt-40 1.0000 set
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.003 hari

Overhead & keuntungan 1


15d 1 Set Top Fact fitting Pt-40 Jumlah & pembulat
15e 1 Set Fact fitting Pt-30
Bahan : Fact fitting Pt-30 1.0000 set
A.4.6.2 Kunci & Kaca / HAL 348 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.003 hari

Overhead & keuntungan 1


15e 1 Set Fact fitting Pt-30 Jumlah & pembulat
15f 1 bh Escutcheon tipe Art 901 DR
Bahan : Escutcheon tipe Art 901 DR 1.0000 bh
Upah : Pekerja 0.020 hari
Tukang kayu 0.200 hari
Kepala tukang 0.020 hari
Mandor 0.010 hari

Overhead & keuntungan 1


15f 1 bh Escutcheon tipe Art 901 DR Jumlah & pembulat
15g 1 bh Shaft door tipe Art 542
Bahan : Shaft door tipe Art 542 1.0000 bh
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.003 hari

Overhead & keuntungan 1


15g 1 bh Shaft door tipe Art 542 Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 349 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
15h 1 bh Anak kunci shaft door tipe Art 543
Bahan : Anak kunci shaft door tipe Art 543 1.0000 bh
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.003 hari

Overhead & keuntungan 1


15h 1 bh Anak kunci shaft door tipe Art 543 Jumlah & pembulat
15i 1 bh Ring Handle shaft door tipe Art RH 8-3
Bahan : Ring Handle shaft door tipe Art RH 8-3 1.0000 bh
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.005 hari
Mandor 0.003 hari

Overhead & keuntungan 1


15i 1 bh Ring Handle shaft door tipe Art RH 8-3 Jumlah & pembulat
15j 1 set Pivot Hinges tipe Art- 7A / 120 SS
Bahan : Pivot Hinges tipe Art- 7A / 120 SS 1.000 psg
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.008 hari

Overhead & keuntungan 1


15j 1 set Pivot Hinges tipe Art- 7A / 120 SS Jumlah & pembulat

15k 1 Psg Automatic Fushbolt setara Wilka tipe Gracia 37M


Bahan : Automatic Fushbolt setara Wilka tipe Gracia 37M - 14" 1.0000 bh
Upah : Pekerja 0.050 hari
Tukang kayu 0.500 hari
Kepala tukang 0.050 hari
Mandor 0.0025 hari

Overhead & keuntungan 1


15k 1 Psg Automatic Fushbolt setara Wilka tipe Gracia 37M Jumlah & pembulat

16 1 m2 Pasang kaca polos 3 mm


Bahan : Kaca 3mm polos 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


16 1 m2 Pasang kaca polos 3 mm Jumlah & pembulat
17 1 m2 Pasang kaca polos 5 mm
Bahan : Kaca 5mm polos 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
A.4.6.2 Kunci & Kaca / HAL 350 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


17 1 m2 Pasang kaca polos 5 mm Jumlah & pembulat
17a 1 m2 Pasang kaca buram 5 mm
Bahan : Kaca 5mm buram 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


17a 1 m2 Pasang kaca buram 5 mm Jumlah & pembulat
17b 1 m2 Pasang kaca tinted 5 mm
Bahan : Kaca tintid 5mm 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


17b 1 m2 Pasang kaca tinted 5 mm Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 351 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
17c 1 m2 Pasang kaca clear tempered t= 5 mm
Bahan : Kacaclear tempered t= 5 mm 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


17c 1 m2 Pasang kaca clear tempered t= 5 mm Jumlah & pembulat

18 1 m2 Pasang kaca polos 8 mm


Bahan : Kaca 8mm polos 1.1000 m2
Upah : Pekerja 0.0165 hari
Tukang kayu 0.165 hari
Kepala tukang 0.0165 hari
Mandor 0.0008 hari

Overhead & keuntungan 1


18 1 m2 Pasang kaca polos 8 mm Jumlah & pembulat

18a 1 m2 Pasang kaca tinted 8 mm


Bahan : Kaca 8mm warna 1.1000 m2
Upah : Pekerja 0.0165 hari
Tukang kayu 0.165 hari
Kepala tukang 0.0165 hari
Mandor 0.0008 hari

Overhead & keuntungan 1


18a 1 m2 Pasang kaca tinted 8 mm Jumlah & pembulat
18b 1 m2 Pasang kaca stop sol 8 mm
Bahan : Kaca stop sol 8mm 1.1000 m2
Upah : Pekerja 0.0165 hari
Tukang kayu 0.165 hari
Kepala tukang 0.0165 hari
Mandor 0.0008 hari

Overhead & keuntungan 1


18b 1 m2 Pasang kaca stop sol 8 mm Jumlah & pembulat
18c 1 m2 Pasang kaca sandblast 8 mm
Bahan : Kaca stop sol 8mm 1.1000 m2
Upah : Pekerja 0.0165 hari
Tukang kayu 0.165 hari
Kepala tukang 0.0165 hari
Mandor 0.0008 hari

Overhead & keuntungan 1


18c 1 m2 Pasang kaca sandblast 8 mm Jumlah & pembulat

18d 1 m2 Pasang kaca tinted tempered t= 8 mm


Bahan : Kacaclear tempered t= 8 mm 1.1000 m2
Upah : Pekerja 0.0165 hari
Tukang kayu 0.165 hari
Kepala tukang 0.0165 hari
A.4.6.2 Kunci & Kaca / HAL 352 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
Mandor 0.0008 hari

Overhead & keuntungan 1


18d 1 m2 Pasang kaca tinted tempered t= 8 mm Jumlah & pembulat

18e 1 m2 Pasang kaca polos tempered t= 8 mm


Bahan : Kacaclear tempered t= 8 mm 1.1000 m2
Upah : Pekerja 0.0165 hari
Tukang kayu 0.165 hari
Kepala tukang 0.0165 hari
Mandor 0.0008 hari

Overhead & keuntungan 1


18e 1 m2 Pasang kaca polos tempered t= 8 mm Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 353 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
19 1 m2 Pasang kaca polos 12 mm
Bahan : Kaca 12mm polos 1.1000 m2
Upah : Pekerja 0.025 hari
Tukang kayu 0.250 hari
Kepala tukang 0.0250 hari
Mandor 0.00125 hari

Overhead & keuntungan 1


19 1 m2 Pasang kaca polos 12 mm Jumlah & pembulat
19a 1 m2 Pasang kaca warna 12 mm
Bahan : Kaca 12mm warna 1.1000 m2
Upah : Pekerja 0.025 hari
Tukang kayu 0.250 hari
Kepala tukang 0.0250 hari
Mandor 0.00125 hari

Overhead & keuntungan 1


19a 1 m2 Pasang kaca warna 12 mm Jumlah & pembulat
19b 1 m2 Pasang kaca tinted tempered t= 12 mm
Bahan : Kacaclear tempered t= 12 mm 1.1000 m2
Upah : Pekerja 0.025 hari
Tukang kayu 0.250 hari
Kepala tukang 0.0250 hari
Mandor 0.00125 hari

Overhead & keuntungan 1


19b 1 m2 Pasang kaca tinted tempered t= 12 mm Jumlah & pembulat

19c 1 m2 Pasang kaca polos tempered t= 12 mm


Bahan : Kacaclear tempered t= 12 mm 1.1000 m2
Upah : Pekerja 0.025 hari
Tukang kayu 0.250 hari
Kepala tukang 0.0250 hari
Mandor 0.00125 hari

Overhead & keuntungan 1


19c 1 m2 Pasang kaca polos tempered t= 12 mm Jumlah & pembulat
19d 1 m2 Pasang kaca Reflective Stopsol On Line 12 mm
Bahan : Kaca Reflective Stopsol On Line 12 mm 1.1000 m2
Upah : Pekerja 0.025 hari
Tukang kayu 0.250 hari
Kepala tukang 0.0250 hari
Mandor 0.00125 hari

Overhead & keuntungan 1


19d 1 m2 Pasang kaca Reflective Stopsol On Line 12 mm Jumlah & pembulat
20 1 m2 Pasang kaca cermin 5 mm
Bahan : Kaca 5mm cermin 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
A.4.6.2 Kunci & Kaca / HAL 354 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
Mandor 0.00075 hari

Overhead & keuntungan 1


20 1 m2 Pasang kaca cermin 5 mm Jumlah & pembulat
24 1 m2 Pasang kaca polos 6 mm
Bahan : Kaca 6mm polos 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


24 1 m2 Pasang kaca polos 6 mm Jumlah & pembulat
24a 1 m2 Pasang kaca buram 6 mm
Bahan : Kaca 6mm buram 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


24a 1 m2 Pasang kaca buram 6 mm Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 355 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
24b 1 m2 Pasang kaca tinted 6 mm
Bahan : Kaca tinted 6mm 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


24b 1 m2 Pasang kaca tinted 6 mm Jumlah & pembulat
24c 1 m2 Pasang kaca cermin 6 mm
Bahan : Kaca 6mm cermin 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


24c 1 m2 Pasang kaca cermin 6 mm Jumlah & pembulat
24d 1 m2 Pasang kaca clear tempered t= 6 mm
Bahan : Kacaclear tempered t= 6 mm 1.1000 m2
Upah : Pekerja 0.015 hari
Tukang kayu 0.150 hari
Kepala tukang 0.015 hari
Mandor 0.00075 hari

Overhead & keuntungan 1


24d 1 m2 Pasang kaca clear tempered t= 6 mm Jumlah & pembulat
25 1 m2 Pasang kaca polos 10 mm
Bahan : Kaca 10mm polos 1.1000 m2
Upah : Pekerja 0.0165 hari
Tukang kayu 0.165 hari
Kepala tukang 0.0165 hari
Mandor 0.0008 hari

Overhead & keuntungan 1


25 1 m2 Pasang kaca polos 10 mm Jumlah & pembulat
25a 1 m2 Pasang kaca warna 10 mm
Bahan : Kaca 10mm warna 1.1000 m2
Upah : Pekerja 0.0165 hari
Tukang kayu 0.165 hari
Kepala tukang 0.0165 hari
Mandor 0.0008 hari

Overhead & keuntungan 1


25a 1 m2 Pasang kaca warna 10 mm Jumlah & pembulat
25b 1 m2 Pasang kaca clear tempered t= 10 mm
Bahan : Kacaclear tempered t= 10 mm 1.1000 m2
Upah : Pekerja 0.0165 hari
Tukang kayu 0.165 hari
Kepala tukang 0.0165 hari
A.4.6.2 Kunci & Kaca / HAL 356 DARI 616
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
Mandor 0.0008 hari

Overhead & keuntungan 1


25b 1 m2 Pasang kaca clear tempered t= 10 mm Jumlah & pembulat

26 1 m2 Pasang kaca clear tempered t= 15 mm


Bahan : Kacaclear tempered t= 15 mm 1.1000 m2
Upah : Pekerja 0.031 hari
Tukang kayu 0.313 hari
Kepala tukang 0.0313 hari
Mandor 0.00156 hari

Overhead & keuntungan 1


26 1 m2 Pasang kaca clear tempered t= 15 mm Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 357 DARI 616


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef. SAT

1 3 4 5
A.4.6.2 PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
27 1 m2 Pasang kaca clear tempered t= 19 mm
Bahan : Kacaclear tempered t= 19 mm 1.1000 m2
Upah : Pekerja 0.040 hari
Tukang kayu 0.396 hari
Kepala tukang 0.0396 hari
Mandor 0.00198 hari

Overhead & keuntungan 1


27 1 m2 Pasang kaca clear tempered t= 19 mm Jumlah & pembulat

28 1 m2 Pasang stiker kaca sanblast


Bahan : Stiker kaca sanblast lebar 120 cm, panjang 50 m/rol 1.1000 m2
Upah : Biaya pasang 1.0000 hari

Overhead & keuntungan 1


28 1 m2 Pasang stiker kaca sanblast Jumlah & pembulat

29 1 m2 Heat-strengthened clear glass t=6mm + clear PVB laminate


1.52mm + Heat-strengthened clear glass t=6mm + rangka
alumunium

Bahan : Heat-strengthened clear glass t=6mm + clear PVB laminate


1.52mm + Heat-strengthened clear glass t=6mm + rangka
alumunium 1.1000 m2
Upah : Pekerja 0.040 hari
Tukang kayu 0.396 hari
Kepala tukang 0.0396 hari
Mandor 0.00198 hari

Overhead & keuntungan 1


29 1 m2 Heat-strengthened clear glass t=6mm + clear PVB laminate
1.52mm + Heat-strengthened clear glass t=6mm + rangka
alumunium Jumlah & pembulat

30 1 m2 Heat-strengthened clear glass t=6mm + clear PVB laminate


1.52mm + Heat-strengthened clear glass t=6mm + rangka
alumunium

Bahan : Heat-strengthened clear glass t=6mm + clear PVB laminate


1.52mm + Heat-strengthened clear glass t=6mm + rangka
alumunium 1.1000 m2
Upah : Pekerja 0.040 hari
Tukang kayu 0.396 hari
Kepala tukang 0.0396 hari
Mandor 0.00198 hari

Overhead & keuntungan 1


30 1 m2 Heat-strengthened clear glass t=6mm + clear PVB laminate
1.52mm + Heat-strengthened clear glass t=6mm + rangka
alumunium Jumlah & pembulat

A.4.6.2 Kunci & Kaca / HAL 358 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

320,000.00 320,000.00 -
260,000.00 260,000.00 -
89,320.00 - 446.60
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 394.63
Jumlah : 580,000.00 70,352.98 650,352.98
Overhead & keuntungan 10% : 65,035.30
Jumlah & pembulatan : 715,300.00

1,771,000.00 1,771,000.00 -
260,000.00 260,000.00 -
89,320.00 - 446.60
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 394.63
Jumlah : 2,031,000.00 70,352.98 2,101,352.98
Overhead & keuntungan 10% : 210,135.30
Jumlah & pembulatan : 2,311,400.00

771,000.00 771,000.00 -
260,000.00 260,000.00 -
89,320.00 - 446.60
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 394.63
Jumlah : 1,031,000.00 70,352.98 1,101,352.98
Overhead & keuntungan 10% : 110,135.30
Jumlah & pembulatan : 1,211,400.00

320,000.00 320,000.00 -
144,000.00 144,000.00 -
89,320.00 - 446.60
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 394.63
Jumlah : 464,000.00 70,352.98 534,352.98
Overhead & keuntungan 10% : 53,435.30
Jumlah & pembulatan : 587,700.00

A.4.6.2 Kunci & Kaca / HAL 359 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

286,000.00 286,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 286,000.00 25,508.18 311,508.18
Overhead & keuntungan 10% : 31,150.82
Jumlah & pembulatan : 342,600.00

814,000.00 814,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 814,000.00 25,508.18 839,508.18
Overhead & keuntungan 10% : 83,950.82
Jumlah & pembulatan : 923,400.00

A.4.6.2 Kunci & Kaca / HAL 360 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

202,000.00 202,000.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 7,892.50
157,850.00 - 394.63
Jumlah : 202,000.00 81,475.63 283,475.63
Overhead & keuntungan 10% : 28,347.56
Jumlah & pembulatan : 311,800.00

1,317,000.00 1,317,000.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 7,892.50
157,850.00 - 394.63
Jumlah : 1,317,000.00 81,475.63 1,398,475.63
Overhead & keuntungan 10% : 139,847.56
Jumlah & pembulatan : 1,538,300.00

96,000.00 192,000.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 7,892.50
157,850.00 - 394.63
Jumlah : 192,000.00 81,475.63 273,475.63
Overhead & keuntungan 10% : 27,347.56
Jumlah & pembulatan : 300,800.00

406,000.00 812,000.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 7,892.50
157,850.00 - 394.63
Jumlah : 812,000.00 81,475.63 893,475.63
Overhead & keuntungan 10% : 89,347.56
Jumlah & pembulatan : 982,800.00

1,695,100.00 1,695,100.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 7,892.50
157,850.00 - 394.63
Jumlah : 1,695,100.00 81,475.63 1,776,575.63
Overhead & keuntungan 10% : 177,657.56
Jumlah & pembulatan : 1,954,200.00

1,303,500.00 1,303,500.00 -
A.4.6.2 Kunci & Kaca / HAL 361 DARI 616
H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 7,892.50
157,850.00 - 394.63
Jumlah : 1,303,500.00 81,475.63 1,384,975.63
Overhead & keuntungan 10% : 138,497.56
Jumlah & pembulatan : 1,523,400.00

31,000.00 31,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 126.28
Jumlah : 31,000.00 24,450.58 55,450.58
Overhead & keuntungan 10% : 5,545.06
Jumlah & pembulatan : 60,900.00

26,000.00 26,000.00 -
89,320.00 - 1,004.85
137,445.00 - 15,462.56
157,850.00 - 1,775.81
157,850.00 - 88.79
Jumlah : 26,000.00 18,332.02 44,332.02
Overhead & keuntungan 10% : 4,433.20
Jumlah & pembulatan : 48,700.00

78,000.00 78,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 78,000.00 25,508.18 103,508.18
Overhead & keuntungan 10% : 10,350.82
Jumlah & pembulatan : 113,800.00

A.4.6.2 Kunci & Kaca / HAL 362 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

95,000.00 95,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 95,000.00 25,508.18 120,508.18
Overhead & keuntungan 10% : 12,050.82
Jumlah & pembulatan : 132,500.00

172,000.00 172,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 172,000.00 25,508.18 197,508.18
Overhead & keuntungan 10% : 19,750.82
Jumlah & pembulatan : 217,200.00

247,000.00 247,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 247,000.00 25,508.18 272,508.18
Overhead & keuntungan 10% : 27,250.82
Jumlah & pembulatan : 299,700.00

247,500.00 247,500.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 7,892.50
157,850.00 - 473.55
Jumlah : 247,500.00 81,554.55 329,054.55
Overhead & keuntungan 10% : 32,905.46
Jumlah & pembulatan : 361,900.00

118,000.00 118,000.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 7,892.50
157,850.00 - 394.63

A.4.6.2 Kunci & Kaca / HAL 363 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

Jumlah : 118,000.00 81,475.63 199,475.63


Overhead & keuntungan 10% : 19,947.56
Jumlah & pembulatan : 219,400.00

35,000.00 35,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 35,000.00 25,508.18 60,508.18
Overhead & keuntungan 10% : 6,050.82
Jumlah & pembulatan : 66,500.00

35,000.00 35,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 35,000.00 25,508.18 60,508.18
Overhead & keuntungan 10% : 6,050.82
Jumlah & pembulatan : 66,500.00

A.4.6.2 Kunci & Kaca / HAL 364 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

89,000.00 89,000.00 -
89,320.00 - 893.20
137,445.00 - 13,744.50
157,850.00 - 1,578.50
157,850.00 - 78.93
Jumlah : 89,000.00 16,295.13 105,295.13
Overhead & keuntungan 10% : 10,529.51
Jumlah & pembulatan : 115,800.00

44,000.00 44,000.00 -
89,320.00 - 893.20
137,445.00 - 13,744.50
157,850.00 - 1,578.50
157,850.00 - 78.93
Jumlah : 44,000.00 16,295.13 60,295.13
Overhead & keuntungan 10% : 6,029.51
Jumlah & pembulatan : 66,300.00

490,000.00 490,000.00 -
89,320.00 - 5,359.20
137,445.00 - 82,467.00
157,850.00 - 9,471.00
157,850.00 - 473.55
Jumlah : 490,000.00 97,770.75 587,770.75
Overhead & keuntungan 10% : 58,777.08
Jumlah & pembulatan : 646,500.00

185,500.00 185,500.00 -
89,320.00 - 5,359.20
137,445.00 - 82,467.00
157,850.00 - 9,471.00
157,850.00 - 473.55
Jumlah : 185,500.00 97,770.75 283,270.75
Overhead & keuntungan 10% : 28,327.08
Jumlah & pembulatan : 311,500.00

278,000.00 278,000.00 -
89,320.00 - 5,359.20
137,445.00 - 82,467.00
157,850.00 - 9,471.00
157,850.00 - 473.55
Jumlah : 278,000.00 97,770.75 375,770.75
Overhead & keuntungan 10% : 37,577.08
Jumlah & pembulatan : 413,300.00

48,500.00 48,500.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
A.4.6.2 Kunci & Kaca / HAL 365 DARI 616
H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

157,850.00 - 1,183.88
Jumlah : 48,500.00 25,508.18 74,008.18
Overhead & keuntungan 10% : 7,400.82
Jumlah & pembulatan : 81,400.00

72,500.00 72,500.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 72,500.00 25,508.18 98,008.18
Overhead & keuntungan 10% : 9,800.82
Jumlah & pembulatan : 107,800.00

200,000.00 200,000.00 -
89,320.00 - 5,359.20
137,445.00 - 82,467.00
157,850.00 - 9,471.00
157,850.00 - 473.55
Jumlah : 200,000.00 97,770.75 297,770.75
Overhead & keuntungan 10% : 29,777.08
Jumlah & pembulatan : 327,500.00

A.4.6.2 Kunci & Kaca / HAL 366 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

11,800.00 11,800.00 -
89,320.00 - 223.30
137,445.00 - 3,436.13
157,850.00 - 394.63
157,850.00 - 197.31
Jumlah : 11,800.00 4,251.36 16,051.36
Overhead & keuntungan 10% : 1,605.14
Jumlah & pembulatan : 17,600.00

1,427,900.00 1,427,900.00 -
89,320.00 - 5,359.20
137,445.00 - 82,467.00
157,850.00 - 9,471.00
157,850.00 - 473.55
Jumlah : 1,427,900.00 97,770.75 1,525,670.75
Overhead & keuntungan 10% : 152,567.08
Jumlah & pembulatan : 1,678,200.00

1,913,000.00 1,913,000.00 -
89,320.00 - 5,359.20
137,445.00 - 82,467.00
157,850.00 - 9,471.00
157,850.00 - 473.55
Jumlah : 1,913,000.00 97,770.75 2,010,770.75
Overhead & keuntungan 10% : 201,077.08
Jumlah & pembulatan : 2,211,800.00

3,646,100.00 3,646,100.00
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 473.55
Jumlah : 3,646,100.00 74,451.30 3,720,551.30
Overhead & keuntungan 10% : 372,055.13
Jumlah & pembulatan : 4,092,600.00

1,749,500.00 1,749,500.00
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 473.55
Jumlah : 1,749,500.00 74,451.30 1,823,951.30
Overhead & keuntungan 10% : 182,395.13
Jumlah & pembulatan : 2,006,300.00

1,177,200.00 1,177,200.00
A.4.6.2 Kunci & Kaca / HAL 367 DARI 616
H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 473.55
Jumlah : 1,177,200.00 74,451.30 1,251,651.30
Overhead & keuntungan 10% : 125,165.13
Jumlah & pembulatan : 1,376,800.00

32,000.00 32,000.00 -
89,320.00 - 1,786.40
137,445.00 - 27,489.00
157,850.00 - 3,157.00
157,850.00 - 1,578.50
Jumlah : 32,000.00 34,010.90 66,010.90
Overhead & keuntungan 10% : 6,601.09
Jumlah & pembulatan : 72,600.00

60,000.00 60,000.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 473.55
Jumlah : 60,000.00 74,451.30 134,451.30
Overhead & keuntungan 10% : 13,445.13
Jumlah & pembulatan : 147,800.00

A.4.6.2 Kunci & Kaca / HAL 368 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

22,000.00 22,000.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 473.55
Jumlah : 22,000.00 74,451.30 96,451.30
Overhead & keuntungan 10% : 9,645.13
Jumlah & pembulatan : 106,000.00

201,000.00 201,000.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 789.25
157,850.00 - 473.55
Jumlah : 201,000.00 74,451.30 275,451.30
Overhead & keuntungan 10% : 27,545.13
Jumlah & pembulatan : 302,900.00

617,000.00 617,000.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 1,183.88
Jumlah : 617,000.00 25,508.18 642,508.18
Overhead & keuntungan 10% : 64,250.82
Jumlah & pembulatan : 706,700.00

118,000.00 118,000.00 -
89,320.00 - 4,466.00
137,445.00 - 68,722.50
157,850.00 - 7,892.50
157,850.00 - 394.63
Jumlah : 118,000.00 81,475.63 199,475.63
Overhead & keuntungan 10% : 19,947.56
Jumlah & pembulatan : 219,400.00

73,700.00 81,070.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 81,070.00 24,442.69 105,512.69
Overhead & keuntungan 10% : 10,551.27
Jumlah & pembulatan : 116,000.00

112,600.00 123,860.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
A.4.6.2 Kunci & Kaca / HAL 369 DARI 616
H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 123,860.00 24,442.69 148,302.69
Overhead & keuntungan 10% : 14,830.27
Jumlah & pembulatan : 163,100.00

140,800.00 154,880.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 154,880.00 24,442.69 179,322.69
Overhead & keuntungan 10% : 17,932.27
Jumlah & pembulatan : 197,200.00

194,700.00 214,170.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 214,170.00 24,442.69 238,612.69
Overhead & keuntungan 10% : 23,861.27
Jumlah & pembulatan : 262,400.00

A.4.6.2 Kunci & Kaca / HAL 370 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

214,700.00 236,170.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 236,170.00 24,442.69 260,612.69
Overhead & keuntungan 10% : 26,061.27
Jumlah & pembulatan : 286,600.00

222,100.00 244,310.00 -
89,320.00 - 1,473.78
137,445.00 - 22,678.43
157,850.00 - 2,604.53
157,850.00 - 126.28
Jumlah : 244,310.00 26,883.01 271,193.01
Overhead & keuntungan 10% : 27,119.30
Jumlah & pembulatan : 298,300.00

382,100.00 420,310.00 -
89,320.00 - 1,473.78
137,445.00 - 22,678.43
157,850.00 - 2,604.53
157,850.00 - 126.28
Jumlah : 420,310.00 26,883.01 447,193.01
Overhead & keuntungan 10% : 44,719.30
Jumlah & pembulatan : 491,900.00

684,200.00 752,620.00 -
89,320.00 - 1,473.78
137,445.00 - 22,678.43
157,850.00 - 2,604.53
157,850.00 - 126.28
Jumlah : 752,620.00 26,883.01 779,503.01
Overhead & keuntungan 10% : 77,950.30
Jumlah & pembulatan : 857,400.00

578,900.00 636,790.00 -
89,320.00 - 1,473.78
137,445.00 - 22,678.43
157,850.00 - 2,604.53
157,850.00 - 126.28
Jumlah : 636,790.00 26,883.01 663,673.01
Overhead & keuntungan 10% : 66,367.30
Jumlah & pembulatan : 730,000.00

550,500.00 605,550.00 -
89,320.00 - 1,473.78
137,445.00 - 22,678.43
157,850.00 - 2,604.53
A.4.6.2 Kunci & Kaca / HAL 371 DARI 616
H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

157,850.00 - 126.28
Jumlah : 605,550.00 26,883.01 632,433.01
Overhead & keuntungan 10% : 63,243.30
Jumlah & pembulatan : 695,600.00

374,700.00 412,170.00 -
89,320.00 - 1,473.78
137,445.00 - 22,678.43
157,850.00 - 2,604.53
157,850.00 - 126.28
Jumlah : 412,170.00 26,883.01 439,053.01
Overhead & keuntungan 10% : 43,905.30
Jumlah & pembulatan : 482,900.00

A.4.6.2 Kunci & Kaca / HAL 372 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

473,700.00 521,070.00 -
89,320.00 - 2,233.00
137,445.00 - 34,361.25
157,850.00 - 3,946.25
157,850.00 - 197.31
Jumlah : 521,070.00 40,737.81 561,807.81
Overhead & keuntungan 10% : 56,180.78
Jumlah & pembulatan : 617,900.00

- - -
- - -
- - -
- - -
- - -
Jumlah : - - -
Overhead & keuntungan 10% : -
Jumlah & pembulatan : -

1,235,800.00 1,359,380.00 -
89,320.00 - 2,233.00
137,445.00 - 34,361.25
157,850.00 - 3,946.25
157,850.00 - 197.31
Jumlah : 1,359,380.00 40,737.81 1,400,117.81
Overhead & keuntungan 10% : 140,011.78
Jumlah & pembulatan : 1,540,100.00

540,000.00 594,000.00 -
89,320.00 - 2,233.00
137,445.00 - 34,361.25
157,850.00 - 3,946.25
157,850.00 - 197.31
Jumlah : 594,000.00 40,737.81 634,737.81
Overhead & keuntungan 10% : 63,473.78
Jumlah & pembulatan : 698,200.00

682,100.00 750,310.00 -
89,320.00 - 2,233.00
137,445.00 - 34,361.25
157,850.00 - 3,946.25
157,850.00 - 197.31
Jumlah : 750,310.00 40,737.81 791,047.81
Overhead & keuntungan 10% : 79,104.78
Jumlah & pembulatan : 870,100.00

368,400.00 405,240.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
A.4.6.2 Kunci & Kaca / HAL 373 DARI 616
H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

157,850.00 - 118.39
Jumlah : 405,240.00 24,442.69 429,682.69
Overhead & keuntungan 10% : 42,968.27
Jumlah & pembulatan : 472,600.00

157,900.00 173,690.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 173,690.00 24,442.69 198,132.69
Overhead & keuntungan 10% : 19,813.27
Jumlah & pembulatan : 217,900.00

197,400.00 217,140.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 217,140.00 24,442.69 241,582.69
Overhead & keuntungan 10% : 24,158.27
Jumlah & pembulatan : 265,700.00

A.4.6.2 Kunci & Kaca / HAL 374 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

246,300.00 270,930.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 270,930.00 24,442.69 295,372.69
Overhead & keuntungan 10% : 29,537.27
Jumlah & pembulatan : 324,900.00

373,700.00 411,070.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 411,070.00 24,442.69 435,512.69
Overhead & keuntungan 10% : 43,551.27
Jumlah & pembulatan : 479,000.00

286,300.00 314,930.00 -
89,320.00 - 1,339.80
137,445.00 - 20,616.75
157,850.00 - 2,367.75
157,850.00 - 118.39
Jumlah : 314,930.00 24,442.69 339,372.69
Overhead & keuntungan 10% : 33,937.27
Jumlah & pembulatan : 373,300.00

368,400.00 405,240.00 -
89,320.00 - 1,473.78
137,445.00 - 22,678.43
157,850.00 - 2,604.53
157,850.00 - 126.28
Jumlah : 405,240.00 26,883.01 432,123.01
Overhead & keuntungan 10% : 43,212.30
Jumlah & pembulatan : 475,300.00

- - -
- - -
- - -
- - -
- - -
Jumlah : - - -
Overhead & keuntungan 10% : -
Jumlah & pembulatan : -

461,100.00 507,210.00 -
89,320.00 - 1,473.78
137,445.00 - 22,678.43
157,850.00 - 2,604.53
A.4.6.2 Kunci & Kaca / HAL 375 DARI 616
H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

157,850.00 - 126.28
Jumlah : 507,210.00 26,883.01 534,093.01
Overhead & keuntungan 10% : 53,409.30
Jumlah & pembulatan : 587,500.00

3,842,100.00 4,226,310.00 -
89,320.00 - 2,791.25
137,445.00 - 42,951.56
157,850.00 - 4,932.81
157,850.00 - 246.64
Jumlah : 4,226,310.00 50,922.27 4,277,232.27
Overhead & keuntungan 10% : 427,723.23
Jumlah & pembulatan : 4,704,900.00

A.4.6.2 Kunci & Kaca / HAL 376 DARI 616


H. SATUAN BAHAN UPAH TOTAL
Rp Rp Rp Rp

6 7 8

6,078,900.00 6,686,790.00 -
89,320.00 - 3,535.58
137,445.00 - 54,405.31
157,850.00 - 6,248.23
157,850.00 - 312.41
Jumlah : 6,686,790.00 64,501.54 6,751,291.54
Overhead & keuntungan 10% : 675,129.15
Jumlah & pembulatan : 7,426,400.00

52,500.00 57,750.00 -
80,000.00 - 80,000.00
Jumlah : 57,750.00 80,000.00 137,750.00
Overhead & keuntungan 10% : 13,775.00
Jumlah & pembulatan : 151,500.00

2,117,500.00 2,329,250.00 -
89,320.00 - 3,535.58
137,445.00 - 54,405.31
157,850.00 - 6,248.23
157,850.00 - 312.41
Jumlah : 2,329,250.00 64,501.54 2,393,751.54
Overhead & keuntungan 10% : 239,375.15

Jumlah & pembulatan : 2,633,100.00

2,329,250.00 2,562,175.00 -
89,320.00 - 3,535.58
137,445.00 - 54,405.31
157,850.00 - 6,248.23
157,850.00 - 312.41
Jumlah : 2,562,175.00 64,501.54 2,626,676.54
Overhead & keuntungan 10% : 262,667.65

Jumlah & pembulatan : 2,889,300.00

A.4.6.2 Kunci & Kaca / HAL 377 DARI 616


0
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

A.4.5.1 PEKERJAAN LANGIT-LANGIT


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan

1 1 m² Pasang Langit-langit Asbes Semen Tebal 4 mm

2 1 m² Pasang Langit-langit Akustik 30 x 30 cm

3 1 m² Pasang Langit-langit Akustik 30 x 60 cm

4 1 m² Pasang Langit-langit Akustik 60 x 120 cm

5 1 m² Pasang Langit-langit Tripleks 120 x 240 cm. Tebal 3. 4. 6 mm

6 1 m² Pasang Langit-langit Tlambrisering kayu, tebal 9 mm

7 1 m² Pasang Langit-langit Gypsum Board 120 x 240 x 9 mm. Tebal 9 mm


Bahan
Gypsum Board t=9mm setara Jayaboard 0.364 Lembar
Drywall Screw 25mmX083 12.153 pc(s)
Jointing Compound UB-10/20/888/CCL 20kg/bag(s) 0.019 bag(s)
UB Tape 75m/roll(s) 0.016 roll(s)
Tenaga Kerja
Pekerja 0.100 org/hr
Tukang 0.050 org/hr
Kepala Tukang 0.005 org/hr
Mandor 0.005 org/hr

7 1 m² Pasang Langit-langit Gypsum Board 120 x 240 x 9 mm. Tebal 9 mm

7a 1 m² Pasang Langit-langit calcium cilicate Board 120 x 240 Tebal 6 mm


Bahan
Calcium cilicate t=6mm setara GRC 0.364 Lembar
Drywall Screw 25mmX083 12.153 pc(s)
Jointing Compound UB-10/20/888/CCL 20kg/bag(s) 0.019 bag(s)
UB Tape 75m/roll(s) 0.016 roll(s)
Tenaga Kerja
Pekerja 0.100 org/hr
Tukang 0.050 org/hr
Kepala Tukang 0.005 org/hr
Mandor 0.005 org/hr

7a 1 m² Pasang Langit-langit calcium cilicate Board 120 x 240 Tebal 6 mm

7b 1 m² Pasang Langit-langit Gypsum water prof 120 x 240 Tebal 9 mm


Bahan
Gyfsum Board water prof Tebal 9 mm 0.364 Lembar
Drywall Screw 25mmX083 12.153 pc(s)
Jointing Compound UB-10/20/888/CCL 20kg/bag(s) 0.019 bag(s)
UB Tape 75m/roll(s) 0.016 roll(s)
Tenaga Kerja
Pekerja 0.100 org/hr
Tukang 0.050 org/hr
A.4.5.1.Pek. Langit2 / HAL 378 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

Kepala Tukang 0.005 org/hr


Mandor 0.005 org/hr

7b 1 m² Pasang Langit-langit Gypsum water prof 120 x 240 Tebal 9 mm

8 1 m² Pasang Ceiling Panel tile acustic 12mm (600mmx1200mm)


Bahan
Ceiling Panel tile acustic 12mm (600mmx1200mm) 1.500 Lembar
Bracket PN-220 / PN-221 1.04 pc(s)
Suspension Rod 2400mm PN-409 0.26 pc(s)
Suspension Clip Adjuster PN-410 1.04 pc(s)
Wall Angel 3000mm PN-408 0.13 pc(s)
Main Tee 3600mm PN-400 0.22 pc(s)
Cross Tee 600mm PN-401 - pc(s)
Cross Tee 1200mm PN-401 1.44 pc(s)
Tenaga Kerja
Pekerja 0.500 org/hr
Tukang 0.500 org/hr
Kepala Tukang 0.050 org/hr
Mandor 0.025 org/hr

8 1 m² Pasang Ceiling Panel tile acustic 12mm (600mmx1200mm)

A.4.5.1.Pek. Langit2 / HAL 379 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

9 1 m1 Pasang List Langit-langit Kayu Profil


Bahan
List Kayu Profil 1.050 m'
Paku 0.010 Kg
Tenaga Kerja
Pekerja 0.050 org/hr
Tukang 0.050 org/hr
Kepala Tukang 0.005 org/hr
Mandor 0.003 org/hr

9 1 m1 Pasang List Langit-langit Kayu Profil

9a 1 m1 Pasang List plafon gyfsum profil


Bahan
gyfsum profil l=7cm 1.050 m'
Tepung gyfsum 0.150 Kg
Tenaga Kerja
Pekerja 0.060 org/hr
Tukang 0.060 org/hr
Kepala Tukang 0.006 org/hr
Mandor 0.003 org/hr

9a 1 m1 Pasang List plafon gyfsum profil


Pasang Langit-langit Gypsum 120 x 240 Tebal 9 mm termasuk rangka hollow galpanis 40
10 1 m²
gantungan
Pemasangan 1 m2 rangka besi hollow galpanis
A.4.2.1 21a 1.000 m2
1x40.40.0,35mm, modul 60 x 120 cm, untuk plapond

Pasang Langit-langit Gypsum Board 120 x 240 x 9 mm. Tebal 9


A.4.5.1 7 1.000 m2
mm
Pasang Langit-langit Gypsum 120 x 240 Tebal 9 mm termasuk rangka hollow gal
10 1 m²
40x40x0.35mm modul 6ox120 termasuk gantungan
Pasang Langit-langit Gypsum Waterproof 120 x 240 Tebal 9 mm termasuk rangka hollow
11 1 m²
termasuk gantungan
Pemasangan 1 m2 rangka besi hollow galpanis
A.4.2.1 21a 1.000 m2
1x40.40.0,35mm, modul 60 x 120 cm, untuk plapond

A.4.5.1 7b Pasang Langit-langit Gypsum water prof 120 x 240 Tebal 9 mm 1.000 m2

Pasang Langit-langit Gypsum Waterproof 120 x 240 Tebal 9 mm termasuk rangk


11 1 m²
hollow galpanis 40x40x0.35mm modul 6ox120 termasuk gantungan

Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka hollow galp
12 1 m²
termasuk gantungan
Pemasangan 1 m2 rangka besi hollow galpanis
A.4.2.1 21a 1.000 m2
1x40.40.0,35mm, modul 60 x 120 cm, untuk plapond
Pasang Langit-langit calcium cilicate Board 120 x 240 Tebal 6
A.4.5.1 7a 1.000 m2
mm
Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka hol
12 1 m²
galpanis 40x40x0.35mm modul 6ox120 termasuk gantungan

A.4.5.1.Pek. Langit2 / HAL 380 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

13 1 m² Pasang Langit-langit Gypsum 120 x 240 Tebal 9 mm termasuk rangka hollow 40x40x2mm

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60


A.4.2.1 21 1.000 m2
x 120 cm
Pasang Langit-langit Gypsum Board 120 x 240 x 9 mm. Tebal 9
A.4.5.1 7 1.000 m2
mm
Pasang Langit-langit Gypsum 120 x 240 Tebal 9 mm termasuk rangka hollow
13 1 m²
40x40x2mm modul 6ox120 termasuk gantungan
Pasang Langit-langit Gypsum Waterproof 120 x 240 Tebal 9 mm termasuk rangka hollow
11 1 m²
gantungan
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60
A.4.2.1 21 1.000 m2
x 120 cm

A.4.5.1 7b Pasang Langit-langit Gypsum water prof 120 x 240 Tebal 9 mm 1.000 m2

Pasang Langit-langit Gypsum Waterproof 120 x 240 Tebal 9 mm termasuk rangk


11 1 m²
hollow 40x40x2mm modul 6ox120 termasuk gantungan

12 1 m² Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka hollow galp
termasuk gantungan
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60
A.4.2.1 21 1.000 m2
x 120 cm

Pasang Langit-langit calcium cilicate Board 120 x 240 Tebal 6


A.4.5.1 7a 1.000 m2
mm
Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka ho
12 1 m²
galpanis 40x40x2mm modul 6ox120 termasuk gantungan

A.4.5.1.Pek. Langit2 / HAL 381 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

13 1 m² Dinding Partisi dobel Gypsum 9 mm + Rangka Metal BMSys


Bahan
Metal Wall Stud 0.570 pc(s)
Metal Wall Track 0.222 pc(s)
Jointing Compound UB-10/20/888/CCL 20kg/bag(s) 0.038 bag(s)
UB Tape 75m/roll(s) 0.032 roll(s)
Drywall Screw 25mmX083 24.306 pc(s)
Jaya Sealant 580ml 0.291 pc(s)
Gypsum 2.4 x 1.2 t= 9 mm Jayaboard 0.700 lembar
Tenaga Kerja
Tukang gypsum 0.300 org/hr
Tukang allumunium 0.200 org/hr
Pekerja 0.200 org/hr
Mandor 0.015 org/hr

13 1 m² Dinding Partisi dobel Gypsum 9 mm + Rangka Metal BMSys


14 1 m² Pasang rangka Hollow 50x100 untuk partisi
Bahan
Hollow Hollow 50x100 0.2917 btg
Drywall Screw 25mmX083 24.306 pc(s)
Tenaga Kerja
Tukang 0.3000 org/hr
Pekerja 0.3000 org/hr
Kepala Tukang 0.0300 org/hr
Mandor 0.0150 org/hr

14 1 m² Pasang rangka Hollow 50x100 untuk partisi

15 1 m² Pasang dinding partisi Gypsum Board rangkap .120 x 240 x 9 mm. Tebal 9 mm
Bahan
Gypsum Board t=9mm setara Jayaboard 0.728 Lembar
Drywall Screw 25mmX083 24.306 pc(s)
Jointing Compound UB-10/20/888/CCL 20kg/bag(s) 0.038 bag(s)
UB Tape 75m/roll(s) 0.032 roll(s)
Tenaga Kerja
Pekerja 0.200 org/hr
Tukang 0.100 org/hr
Kepala Tukang 0.010 org/hr
Mandor 0.010 org/hr

15 1 m² Pasang dinding partisi Gypsum Board rangkap .120 x 240 x 9 mm. Tebal 9 mm

16 1 m² Dinding Partisi dobel Gypsum 9 mm + Rangka Hollow 50x100mm


14 1 m² Pasang rangka Hollow 50x100 untuk partisi 1 m2
15 1 m² Pasang dinding partisi Gypsum Board rangkap .120 x
240 x 9 mm. Tebal 9 mm 1 m2
10 1 m2 Cat tembok Interior ICI Dulux (1 lapis plamuur, 1 lapis
cat dasar, 2 lapis cat penutup) 2 m2

16 1 m² Dinding Partisi dobel Gypsum 9 mm + Rangka Hollow 50x100mm


A.4.5.1.Pek. Langit2 / HAL 382 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

17 1 m² Anti bacterial ceilling setara Bioguard 16mm + Suspension system Prelude stand
Anti bacterial ceilling setara Bioguard 16mm +
Harga terpasang Suspension system Prelude standard t=24mm setara
Armstrong 1.05

Anti bacterial ceilling setara Bioguard 16mm + Suspension system Prelude stand
17 1 m²
t=24mm setara Armstrong

18 1 m² Anti bacterial ceilling setara Bioguard 16mm + Suspension system cleanroom alu
Anti bacterial ceilling setara Bioguard 16mm +
Harga terpasang Suspension system cleanroom alumunium setara
Armstrong 1.05

Anti bacterial ceilling setara Bioguard 16mm + Suspension system cleanroom


18 1 m²
alumunium setara Armstrong

A.4.5.1.Pek. Langit2 / HAL 383 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

19 1 m² Accustic tile ceilling setara tipe Dune 16mm + Suspension system Suprafine Grid
Accustic tile ceilling setara tipe Dune 16mm +
Harga terpasang Suspension system Suprafine Grids t=15mm setara
Armstrong 1.05

Accustic tile ceilling setara tipe Dune 16mm + Suspension system Suprafine Grid
19 1 m²
t=15mm setara Armstrong

20 1 m² Gypsum board TKA 2 jam t=13mm + Suspension system setara Prelude standard
Gypsum board TKA 2 jam setara Firestop t=16mm x 2
Harga terpasang
lapis+ rangka hollow 40x40mm t=0.35mm galvanized 1.05

Gypsum board TKA 2 jam t=13mm + Suspension system setara Prelude standard
20 1 m²
t=24mm

21 1 m1 Pasang Shadow line aluminium "U" Channel


Bahan
gyfsum profil l=7cm 1.050 m'
Tenaga Kerja
Pekerja 0.070 org/hr
Tukang 0.035 org/hr
Kepala Tukang 0.004 org/hr
Mandor 0.002 org/hr

21 1 m1 Pasang Shadow line aluminium "U" Channel

22 1 m2 Profiled zincalume metal sheet


1 Bahan
Profiled zincalume metal sheet 1.050 m2
Hollow 4 x 4 cm t=2mm
Assesoris 4.00 m'
(perkuatan, las dll) 100% x rangka 1.00 LS
2 Tenaga
Pekerja 0.150 oh
Tukang kayu 0.750 oh
Kepala tukang 0.008 oh
Mandor 0.006 oh

Overhea

22 1 m2 Profiled zincalume metal sheet

23 1 m2 Heat-strengthened clear glass t=6mm + clear PVB laminate 1.52mm + Heat-


rangka alumunium transm & mullio
1 Rangka terpasang
Alumunium transm & mullio 2.600 m1
2 Penutup terpasang

A.4.5.1.Pek. Langit2 / HAL 384 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

Heat-strengthened clear glass t=6mm + clear PVB


laminate 1.52mm + Heat-strengthened clear glass
t=6mm 1.000 m2

Overhead &

Heat-strengthened clear glass t=6mm + clear PVB laminate 1.52mm + Heat-


23 1 m2
strengthened clear glass t=6mm + rangka alumunium transm & mullio

24 1 m2 Alumunium linear ceilling finish powder coating warna/motf kayu


1 Terpasang
Alumunium linear ceilling finish powder coating
warna/motf kayu 1.050 m2

Overhea

24 1 m2 Alumunium linear ceilling finish powder coating warna/motf kayu

Perforated Accustic plaster board seamless factory pre-coated + rangka hollow 40x40mm
25 1 m²
gantungan
Pemasangan 1 m2 rangka besi hollow galpanis
A.4.2.1 21a 1.000 m2
1x40.40.0,35mm, modul 60 x 120 cm, untuk plapond
Terpasang Perforated Accustic plaster board seamless factory pre-coated 1.000 m2
Perforated Accustic plaster board seamless factory pre-coated + rangka hollow
25 1 m²
40x40mm t=0.35mm galvanized termasuk gantungan

A.4.5.1.Pek. Langit2 / HAL 385 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4

7a 1 m1 Pasang calcium cilicate Tebal 8 mm


Bahan
Calcium cilicate t=8mm setara GRC 0.450 Lembar
Drywall Screw 25mmX083 5.469 pc(s)
Jointing Compound UB-10/20/888/CCL 20kg/bag(s) 0.009 bag(s)
UB Tape 75m/roll(s) 0.007 roll(s)
Tenaga Kerja
Pekerja 0.045 org/hr
Tukang 0.023 org/hr
Kepala Tukang 0.002 org/hr
Mandor 0.002 org/hr

7a 1 m1 Pasang calcium cilicate Tebal 8 mm

Cara Menghitung Berat Besi Hollow

Misalkan:
Panjang Hollow (L) = 6000 mm
Lebar Hollow (W) = 40 mm
Tinggi hollow (H) = 40 mm
Ketebalan (B) = 2 mm
Berat jenis besi = 7850 (Kg/M3)
Berat Jenis besi (BJ) = 7.85 Kg/ 1.000.000 mm3

Berat Hollow = (W+H) X 2 X L X B X BJ


= (40+40)mm x 2 x 6000mm x 2mm x 7.85Kg/1.000.000 mm3
= 15.072Kg

A.4.5.1.Pek. Langit2 / HAL 386 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp
5 6 7.00

34,479.73
84,810.00 30,870.84
83.60 1,015.97
111,026.67 2,109.51
30,213.33 483.41
17,382.75
89,320.00 8,932.00
137,445.00 6,872.25
157,850.00 789.25
157,850.00 789.25
Jumlah 51,862.48
Overhead & keuntungan 10% : 5,186.25
Jumlah : 57,048.73
Dibulatkan : 57,000.00

57,062.29
146,850.00 53,453.40
83.60 1,015.97
111,026.67 2,109.51
30,213.33 483.41
17,382.75
89,320.00 8,932.00
137,445.00 6,872.25
157,850.00 789.25
157,850.00 789.25
Jumlah 74,445.04
Overhead & keuntungan 10% : 7,444.50
Jumlah : 81,889.55
Dibulatkan : 81,800.00

45,730.97
115,720.00 42,122.08
83.60 1,015.97
111,026.67 2,109.51
30,213.33 483.41
17,382.75
89,320.00 8,932.00
137,445.00 6,872.25
A.4.5.1.Pek. Langit2 / HAL 387 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp
5 6 7.00

157,850.00 789.25
157,850.00 789.25
Jumlah 63,113.72
Overhead & keuntungan 10% : 6,311.37
Jumlah : 69,425.10
Dibulatkan : 69,400.00

96,325.87
35,530.00 53,295.00
1,320.00 1,372.80
5,573.33 1,463.00
4,253.33 4,423.47
28,013.33 3,734.18
49,133.33 10,917.43
7,480.00 -
14,666.67 21,120.00
125,221.25
89,320.00 44,660.00
137,445.00 68,722.50
157,850.00 7,892.50
157,850.00 3,946.25
Jumlah 221,547.12
Overhead & keuntungan 10% : 22,154.71
Jumlah : 243,701.83
Dibulatkan : 243,700.00

A.4.5.1.Pek. Langit2 / HAL 388 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp
5 6 7.00

14,438.34
13,750.00 14,437.50
83.60 0.84
12,601.05
89,320.00 4,466.00
137,445.00 6,872.25
157,850.00 789.25
157,850.00 473.55
Jumlah 27,039.39
Overhead & keuntungan 10% : 2,703.94
Jumlah : 29,743.32
Dibulatkan : 29,700.00

16,226.93
14,630.00 15,361.50
5,769.50 865.43
15,026.55
89,320.00 5,359.20
137,445.00 8,246.70
157,850.00 947.10
157,850.00 473.55
Jumlah 31,253.48
Overhead & keuntungan 10% : 3,125.35
Jumlah : 34,378.82
Dibulatkan : 34,300.00
Tebal 9 mm termasuk rangka hollow galpanis 40x40x0.35mm modul 6ox120 termasuk

165,200.00 165,200.00

57,000.00 57,000.00

0 x 240 Tebal 9 mm termasuk rangka hollow galpanis


Dibulatkan :
masuk gantungan 222,200.00
f 120 x 240 Tebal 9 mm termasuk rangka hollow galpanis 40x40x0.35mm modul 6ox120

165,200.00 165,200.00

69,400.00 69,400.00

aterproof 120 x 240 Tebal 9 mm termasuk rangka


Dibulatkan :
modul 6ox120 termasuk gantungan 234,600.00

0 x 240 Tebal 6 mm termasuk rangka hollow galpanis 40x40x0.35mm modul 6ox120

165,200.00 165,200.00

81,800.00 81,800.00

cate 120 x 240 Tebal 6 mm termasuk rangka hollow


Dibulatkan :
ox120 termasuk gantungan 247,000.00

A.4.5.1.Pek. Langit2 / HAL 389 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp
5 6 7.00

Tebal 9 mm termasuk rangka hollow 40x40x2mm modul 6ox120 termasuk gantungan

121,800.00 121,800.00

57,000.00 57,000.00

20 x 240 Tebal 9 mm termasuk rangka hollow


Dibulatkan :
suk gantungan 178,800.00
f 120 x 240 Tebal 9 mm termasuk rangka hollow 40x40x2mm modul 6ox120 termasuk

121,800.00 121,800.00

69,400.00 69,400.00

aterproof 120 x 240 Tebal 9 mm termasuk rangka


Dibulatkan :
0 termasuk gantungan 191,200.00
0 x 240 Tebal 6 mm termasuk rangka hollow galpanis 40x40x2mm modul 6ox120

121,800.00 121,800.00

81,800.00 81,800.00

cate 120 x 240 Tebal 6 mm termasuk rangka hollow


Dibulatkan :
20 termasuk gantungan 203,600.00

A.4.5.1.Pek. Langit2 / HAL 390 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp
5 6 7.00

114,570.98
60,573.33 34,526.80
60,573.33 13,459.39
111,026.67 4,219.01
30,213.33 966.83
83.60 2,031.95
- -
84,810.00 59,367.00
88,954.25
137,445.00 41,233.50
137,445.00 27,489.00
89,320.00 17,864.00
157,850.00 2,367.75
Jumlah 203,525.23
Overhead & keuntungan 10% : 20,352.52
Jumlah : 223,877.76
Dibulatkan : 223,800.00

305,989.45
1,042,140.00 303,957.50
83.60 2,031.95
75,132.75
137,445.00 41,233.50
89,320.00 26,796.00
157,850.00 4,735.50
157,850.00 2,367.75
Jumlah 381,122.20
Overhead & keuntungan 10% : 38,112.22
Jumlah : 419,234.42
Dibulatkan : 419,200.00

63,773.63
84,810.00 61,741.68
83.60 2,031.95
111,026.67 4,219.01
30,213.33 966.83
34,765.50
89,320.00 17,864.00
137,445.00 13,744.50
157,850.00 1,578.50
157,850.00 1,578.50
Jumlah 98,539.13
Overhead & keuntungan 10% : 9,853.91
Jumlah : 108,393.04
Board rangkap .120 x 240 x 9 mm. Tebal 9 mm Dibulatkan : 108,300.00

419,200.00 419,200.00

108,300.00 108,300.00

28,000.00 56,000.00
Jumlah 583,500.00
Dibulatkan : 583,500.00
A.4.5.1.Pek. Langit2 / HAL 391 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp
5 6 7.00

uard 16mm + Suspension system Prelude standard t=24mm setara Armstrong

363,000.00 381,150.00

Jumlah 381,150.00
Keuntungan 10% : 38,115.00
Jumlah : 419,265.00
guard 16mm + Suspension system Prelude standard
Dibulatkan :
419,200.00

uard 16mm + Suspension system cleanroom alumunium setara Armstrong

572,000.00 600,600.00

Jumlah 600,600.00
Keuntungan 10% : 60,060.00
Jumlah : 660,660.00
guard 16mm + Suspension system cleanroom
Dibulatkan :
660,600.00

A.4.5.1.Pek. Langit2 / HAL 392 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp
5 6 7.00

une 16mm + Suspension system Suprafine Grids t=15mm setara Armstrong

363,000.00 381,150.00

Jumlah 381,150.00
Keuntungan 10% : 38,115.00
Jumlah : 419,265.00
Dune 16mm + Suspension system Suprafine Grids
Dibulatkan :
419,200.00

m + Suspension system setara Prelude standard t=24mm

539,442.20 566,414.31

Jumlah 566,414.31
Keuntungan 10% : 56,641.43
Jumlah : 623,055.74
m + Suspension system setara Prelude standard
Dibulatkan :
623,000.00

4,273.50
4,070.00 4,273.50
11,891.69
89,320.00 6,252.40
137,445.00 4,810.58
157,850.00 552.48
157,850.00 276.24
Jumlah 16,165.19
Overhead & keuntungan 10% : 1,616.52
Jumlah : 17,781.71
Dibulatkan : 17,700.00

221,941.24
140,274.20 147,287.91
9,331.67 37,326.67
37,326.67 37,326.67
118,691.65
89,320.00 13,398.00
137,445.00 103,083.75
157,850.00 1,262.80
157,850.00 947.10

Jumlah 340,632.89
Overhead & keuntungan 10% : 34,063.29
Jumlah : 374,696.18
Dibulatkan : 374,600.00

=6mm + clear PVB laminate 1.52mm + Heat-strengthened clear glass t=6mm +


ullio
3,369,680.00
283,300.00 736,580.00

A.4.5.1.Pek. Langit2 / HAL 393 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp
5 6 7.00

2,633,100.00 2,633,100.00

Jumlah 3,369,680.00
Overhead & keuntungan include : -
Jumlah : 3,369,680.00
=6mm + clear PVB laminate 1.52mm + Heat-
Dibulatkan :
m + rangka alumunium transm & mullio 3,369,600.00

851,025.00

810,500.00 851,025.00

Jumlah 851,025.00
Overhead & keuntungan 10% : 85,102.50
Jumlah : 936,127.50
Dibulatkan : 936,100.00

ss factory pre-coated + rangka hollow 40x40mm t=0.35mm galvanized termasuk

165,200.00 165,200.00

69,400.00 69,400.00
d seamless factory pre-coated + rangka hollow
Dibulatkan :
ermasuk gantungan 234,600.00

A.4.5.1.Pek. Langit2 / HAL 394 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp
5 6 7.00

94,040.50
205,370.00 92,416.50
83.60 457.19
111,026.67 949.28
30,213.33 217.54
7,822.24
89,320.00 4,019.40
137,445.00 3,092.51
157,850.00 355.16
157,850.00 355.16
Jumlah 101,862.74
Overhead & keuntungan 10% : 10,186.27
Jumlah : 112,049.01
Dibulatkan : 112,000.00

A.4.5.1.Pek. Langit2 / HAL 395 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

A.4.7.1 PEKERJAAN PENGECATAN


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
1 1 m2 Mengikis/mengerok permukaan cat tembok lama
1 Bahan
Soda api 0.050 kg 22,500.00

2 Tenaga
Pekerja 0.150 oh 89,320.00
Tukang cat - oh 137,445.00
Kepala tukang - oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

1 1 m2 Mengikis/mengerok permukaan cat tembok lama


2 1 m2 Mencuci bidang permukaan tembok yang pernah dicat
### Bahan
Sabun 0.050 kg 7,500.00

2 Tenaga
Pekerja 0.150 oh 89,320.00
Tukang cat - oh 137,445.00
Kepala tukang - oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

2 1 m2 Mencuci bidang permukaan tembok yang pernah dicat


3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
1 Bahan
Sabun 0.050 kg 7,500.00

2 Tenaga
Pekerja 0.150 oh 89,320.00
Tukang cat - oh 137,445.00
Kepala tukang - oh 157,850.00
Mandor 0.0080 oh 157,850.00

Overhead & keu

3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual


4 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
1 Bahan
Cat meni 0.200 kg 37,180.00
Plamir 0.150 kg 31,130.00
Cat dasar 0.170 kg 57,640.00
Cat penutup 2 kali 0.260 kg 57,640.00
Kuas 0.010 bh 33,330.00
Pengencer 0.030 kg 19,800.00
Ampelas 0.200 lbr 6,021.40

2 Tenaga
Pekerja 0.070 oh 89,320.00
Tukang cat 0.009 oh 137,445.00
Kepala tukang 0.006 oh 157,850.00
Mandor 0.0030 oh 157,850.00

A4.7.1. Pek-Cat / HAL 396 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

Overhead & keu

4 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
5 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
1 Bahan
Cat meni 0.200 kg 37,180.00
Plamir 0.150 kg 31,130.00
Cat dasar 0.170 kg 57,640.00
Cat penutup 2 kali 0.350 kg 57,640.00
Kuas 0.010 bh 33,330.00
Pengencer 0.030 kg 19,800.00
Ampelas 0.200 lbr 6,021.40

2 Tenaga
Pekerja 0.070 oh 89,320.00
Tukang cat 0.105 oh 137,445.00
Kepala tukang 0.004 oh 157,850.00
Mandor 0.0030 oh 157,850.00

Overhead & keu

5 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup

A4.7.1. Pek-Cat / HAL 397 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

6 1 m2 Pelaburan bidang kayu dengan teak oil


1 Bahan
Teak oil 0.360 kg Err:509

2 Tenaga
Pekerja 0.070 oh 89,320.00
Tukang cat 0.009 oh 137,445.00
Kepala tukang 0.006 oh 157,850.00
Mandor 0.0030 oh 157,850.00

Overhead & keu

6 1 m2 Pelaburan bidang kayu dengan teak oil


7 1 m2 Pelaburan bidang kayu dengan politur
1 Bahan
Sirlak India 0.150 kg 45,000.00
Sepirtus 0.372 ltr 12,500.00
Ampelas 2.000 lbr 6,021.40

2 Tenaga
Pekerja - oh 89,320.00
Tukang politur 0.160 oh 137,445.00
Kepala tukang 0.016 oh 157,850.00
Mandor 0.0030 oh 157,850.00

Overhead & keu

7 1 m2 Pelaburan bidang kayu dengan politur

8 1 m2 Pelaburan 1 m2 bidang kayu dengan cat residu dan ter

9 1 m2 Pelaburan bidang kayu dengan vernis


1 Bahan
Vernis 0.150 ltr 35,000.00
Dempul 0.050 kg 59,400.00
Ampelas 0.100 lbr 6,021.40
Kuas 0.010 bh 20,790.00

2 Tenaga
Pekerja 0.160 oh 89,320.00
Tukang cat 0.160 oh 137,445.00
Kepala tukang 0.016 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

9 1 m2 Pelaburan bidang kayu dengan vernis

10 1 m2 Cat tembok Interior ICI Dulux (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan
Wall filler ex. ICI Dulux 0.100 kg 22,880.00
Cat dasar Interior setara Jotun 0.100 lt 31,350.00
Cat Dasar 0.260 lt 31,350.00

2 Tenaga
Pekerja 0.020 oh 89,320.00
A4.7.1. Pek-Cat / HAL 398 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

Tukang cat 0.063 oh 137,445.00


Kepala tukang 0.0063 oh 157,850.00
Mandor 0.0030 oh 157,850.00

Overhead & keu

10 1 m2 Cat tembok Interior ICI Dulux (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

10a 1 m2 Cat tembok exterior Weathershield ICI Dulux ( 1 lapis cat dasar, 2 lapis cat penutup )

1 Bahan
Cat jenis alkali 1 x 0.100 kg 45,430.00
Cat tembok exterior Weathershield ICI Dulux
0.100 lt 48,400.00
( Cat dasar 1 x )
Cat tembok exterior Weathershield setara Jotun
0.260 lt 48,400.00
( Cat penutup 2 x )

2 Tenaga
Pekerja 0.020 oh 89,320.00
Tukang cat 0.063 oh 137,445.00
Kepala tukang 0.0063 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

10a 1 m2 Cat tembok exterior Weathershield ICI Dulux ( 1 lapis cat dasar, 2 lapis cat penutup )

A4.7.1. Pek-Cat / HAL 399 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

10b 1 m2 Pengecatan 1 m2 tembok baru interior AGE (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penu
1 Bahan
Wall filler ex. ICI Dulux 0.100 kg 22,880.00
Cat dasar ICI Dulux ( Cat dasar 1 x ) 0.100 lt 63,030.00
Cat jenis AGE setara ICI Dulux (cat penutup 2 x) 0.260 lt 63,030.00

2 Tenaga
Pekerja 0.020 oh 89,320.00
Tukang cat 0.063 oh 137,445.00
Kepala tukang 0.0063 oh 157,850.00
Mandor 0.0030 oh 157,850.00

Overhead & keu

Pengecatan 1 m2 tembok baru interior AGE (1 lapis plamuur, 1 lapis cat dasar, 2 lapis
10b 1 m2
cat penutup)
10c 1 m2 Pengecatan 1 m2 tembok baru interior Anti bakteri (1 lapis plamuur, 1 lapis cat dasar, 2 lapis ca
1 Bahan
Wall filler ex. ICI Dulux 0.100 kg 22,880.00
Cat dasar ( Cat dasar 1 x ) 0.100 lt 91,850.00
Cat jenis Anti bakteri (cat penutup 2 x) 0.260 lt 91,850.00

2 Tenaga
Pekerja 0.020 oh 89,320.00
Tukang cat 0.063 oh 137,445.00
Kepala tukang 0.0063 oh 157,850.00
Mandor 0.0030 oh 157,850.00

Overhead & keu

Pengecatan 1 m2 tembok baru interior Anti bakteri (1 lapis plamuur, 1 lapis cat dasar, 2
10c 1 m2
lapis cat penutup)
10d 1 m2 Pengecatan plafon/dak beton baru jenis AEP ( lapis cat dasar, 2 lapis cat penutup)
1 Bahan
Plamir - kg 22,880.00
Cat dasar 1 x 0.100 kg 31,350.00
Cat penutup 2 x 0.260 kg 31,350.00

2 Tenaga
Pekerja 0.025 oh 89,320.00
Tukang cat 0.065 oh 137,445.00
Kepala tukang 0.0065 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

10d 1 m2 Pengecatan plafon/dak beton baru jenis AEP ( lapis cat dasar, 2 lapis cat penutup)
10e 1 m2 Pengecatan plafon/dak beton baru Weathershield (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan
Plamir - kg 22,880.00
Cat dasar 1 x 0.100 kg 48,400.00
Cat penutup 2 x 0.260 kg 48,400.00

2 Tenaga
A4.7.1. Pek-Cat / HAL 400 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

Pekerja 0.025 oh 89,320.00


Tukang cat 0.065 oh 137,445.00
Kepala tukang 0.0065 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

10e 1 m2 Pengecatan plafon/dak beton baru Weathershield (1 lapis cat dasar, 2 lapis cat penutup)

10f 1 m2 Pengecatan plafon/dak beton baru jenis cat anti bakteri (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan
Plamir - kg 22,880.00
Cat dasar 1 x 0.100 kg 91,850.00
Cat penutup 2 x 0.260 kg 91,850.00

2 Tenaga
Pekerja 0.025 oh 89,320.00
Tukang cat 0.065 oh 137,445.00
Kepala tukang 0.0065 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

Pengecatan plafon/dak beton baru jenis cat anti bakteri (1 lapis cat dasar, 2 lapis cat
10f 1 m2
penutup)

A4.7.1. Pek-Cat / HAL 401 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

10g 1 m2 Pengecatan plafon/dak beton baru jenis cat AGE (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan
Plamir - kg 22,880.00
Cat dasar 1 x 0.100 kg 63,030.00
Cat penutup 2 x 0.260 kg 63,030.00

2 Tenaga
Pekerja 0.025 oh 89,320.00
Tukang cat 0.065 oh 137,445.00
Kepala tukang 0.0065 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

10g 1 m2 Pengecatan plafon/dak beton baru jenis cat AGE (1 lapis cat dasar, 2 lapis cat penutup)
11 1 m2 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan
Wall filler ex. ICI Dulux - kg 22,880.00
Cat dasar ex. Catilax 0.120 lt 31,790.00
Cat dasar ex. Catilax jenis AEP 0.180 lt 31,790.00

2 Tenaga
Pekerja 0.028 oh 89,320.00
Tukang cat 0.042 oh 137,445.00
Kepala tukang 0.0042 oh 157,850.00
Mandor 0.0030 oh 157,850.00

Overhead & keu

11 1 m2 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)


12 1 m2 Melabur tembok dengan kalkarium
1 Bahan
Kalkarium 0.100 kg 6,000.00

2 Tenaga
Pekerja 0.028 oh 89,320.00
Tukang cat 0.042 oh 137,445.00
Kepala tukang 0.0042 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

12 1 m2 Melabur tembok dengan kalkarium


13 1 m2 Melabur tembok dengan kapur sirih
1 Bahan
Ampelas 0.100 kg 6,021.40
Alang-alang 0.250 ikat 2,000.00
Perancah kayu - m3 2,158,310.00
Kapur sirih 0.150 kg 4,000.00

2 Tenaga
Pekerja 0.150 oh 89,320.00
Tukang cat 0.001 oh 137,445.00
Kepala tukang 0.0001 oh 157,850.00
Mandor 0.0025 oh 157,850.00
A4.7.1. Pek-Cat / HAL 402 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

Overhead & keu

13 1 m2 Melabur tembok dengan kapur sirih


14 1 m2 Melabur tembok lama dengan kapur sirih (pemeliharaan)
1 Bahan
Ampelas 0.200 kg 6,021.40
Alang-alang 0.250 ikat 2,000.00
Kapur sirih 0.300 kg 4,000.00

2 Tenaga
Pekerja 0.040 oh 89,320.00
Tukang cat 0.005 oh 137,445.00
Kepala tukang 0.0005 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

14 1 m2 Melabur tembok lama dengan kapur sirih (pemeliharaan)

A4.7.1. Pek-Cat / HAL 403 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

16 1 m2 Pengecatan permukaan baja dengan meni besi


1 Bahan
Meni besi 0.100 kg 37,180.00
Kuas 0.010 bh 20,790.00

2 Tenaga
Pekerja 0.020 oh 89,320.00
Tukang cat 0.200 oh 137,445.00
Kepala tukang 0.020 oh 157,850.00
Mandor 0.010 oh 157,850.00

Overhead & keu

16 1 m2 Pengecatan permukaan baja dengan meni besi


17 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah
1 Bahan
Meni besi 0.100 kg 37,180.00
Kuas 0.010 bh 20,790.00
Perancah kayu 0.002 m3 2,158,310.00

2 Tenaga
Pekerja 0.250 oh 89,320.00
Tukang cat 0.225 oh 137,445.00
Kepala tukang 0.023 oh 157,850.00
Mandor 0.008 oh 157,850.00

Overhead & keu

17 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah


1 m2 Pengecatan permukaan baja lapis seng
18 (galpanis) secara manual sistem 4 lapis cat
konvensional dengan tebal 200 um
1 Bahan
Meni (read lead) A 0.100 kg 35,000.00
Meni (read lead) B 0.100 kg 35,000.00
Aluminium C 0.040 kg 75,000.00
Aluminium B 0.040 kg 75,000.00
Pengencer/thiner 0.010 ltr 19,800.00
Perancah kayu 0.002 m3 2,158,310.00

2 Tenaga
Pekerja 0.006 oh 89,320.00
Tukang cat 0.006 oh 137,445.00
Kepala tukang 0.0225 oh 157,850.00
Mandor 0.0075 oh 157,850.00

Overhead & keu

Pengecatan permukaan baja lapis seng (galpanis) secara manual sistem 4 lapis cat
18 1 m2
konvensional dengan tebal 200 um
1 m2 Pengecatan permukaan baja lapis seng
19 (galpanis) secara manual sistem 4 lapis cat
mutakhir dengan tebal 200 um
1 Bahan
Cat 0.300 kg 75,000.00

2 Tenaga
A4.7.1. Pek-Cat / HAL 404 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

Pekerja 0.006 oh 89,320.00


Tukang cat 0.006 oh 137,445.00
Kepala tukang 0.0225 oh 157,850.00
Mandor 0.0075 oh 157,850.00

Overhead & keu

Pengecatan permukaan baja lapis seng (galpanis) secara manual sistem 4 lapis cat
19 1 m2
mutakhir dengan tebal 200 um
1 m2 Pengecatan permukaan baja lapis seng
20 (galvanis) secara manual sistem 3 lapis cat
konvensional dengan tebal 200 um
1 Bahan
Cat dasar 0.110 kg 75,000.00
Cat antara 0.170 kg 75,000.00
Cat penutup 0.080 kg 75,000.00
Jumlah (1).

2 Tenaga
Pekerja 0.500 oh 89,320.00
Tukang cat 0.800 oh 137,445.00
Kepala tukang 0.300 oh 157,850.00
Mandor 0.200 oh 157,850.00

Overhead & keu

Pengecatan permukaan baja lapis seng (galvanis) secara manual sistem 3 lapis cat
20 1 m2
konvensional dengan tebal 200 um

A4.7.1. Pek-Cat / HAL 405 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

21 1 m2 Pengecatan permukaan baja lapis seng (galvani) secara semprot (airless spray) dengan sistem
1 Bahan
Cat dasar 0.300 kg 75,000.00

2 Tenaga
Pekerja 0.400 oh 89,320.00
Tukang cat 0.700 oh 137,445.00
Kepala tukang 0.200 oh 157,850.00
Mandor 0.200 oh 157,850.00

Overhead & keu

Pengecatan permukaan baja lapis seng (galvani) secara semprot (airless spray) dengan
21 1 m2
sistem 1 lapis cat mutakhir dengan tebal 200 um
22 10 m2 Pengecatan melamik
1 Bahan
Wood filer ex. Imfra 1.500 kg 59,400.00
Wood Stend 1.500 kg 47,300.00
Sending Seller 1.500 kg 38,500.00
Clear 2.400 kg 44,000.00
Tiner Serba Guna 2.000 ltr 19,800.00
Ampelas 6.000 lbr 6,021.40

2 Tenaga
Pekerja 2.0000 oh 89,320.00
Tukang cat 12.0000 oh 137,445.00
Kepala tukang 1.2000 oh 157,850.00
Mandor 0.1000 oh 157,850.00

Overhead & keu

22 10 m2 Pengecatan melamik
22 1 m2 Pengecatan melamik
23 10 m2 Pengecatan Duco bidang kayu baru/besi ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
1 Bahan
Dempul duco setara mutu tinggi 1.5000 kg 38,500.00
Meni 1.9200 kg 37,180.00
Cat kayu DUCO setara mutu tinggi 3.0000 kg 55,550.00
Hampelas 6.0000 lb 6,021.40
Thiner ( minyak cat A ) 2.0000 lt 19,800.00

2 Tenaga
Pekerja 2.0000 oh 89,320.00
Tukang cat 12.0000 oh 137,445.00
Kepala tukang 1.2000 oh 157,850.00
Mandor 0.1000 oh 157,850.00

Overhead & keu

Pengecatan Duco bidang kayu baru/besi ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat
23 10 m2
penutup

A4.7.1. Pek-Cat / HAL 406 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

Pengecatan Duco bidang kayu baru/besi ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat
23 1 m2
penutup
24 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan
Cat dasar 0.120 kg 31,790.00
Cat penutup 2 x 0.180 kg 31,790.00

2 Tenaga
Pekerja 0.028 oh 89,320.00
Tukang cat 0.042 oh 137,445.00
Kepala tukang 0.0042 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

24 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

A4.7.1. Pek-Cat / HAL 407 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

25 1 m2 Pengecatan marka jalan/garis parkir t=2-3mm


1 Bahan
Cat marka setara AASTHO-79 3.500 kg 236,500.00

2 Tenaga
Pekerja 0.040 oh 89,320.00
Tukang cat 0.125 oh 137,445.00
Kepala tukang 0.0125 oh 157,850.00
Mandor 0.0020 oh 157,850.00

Overhead & keu

25 1 m2 Pengecatan marka jalan/garis parkir t=2-3mm


25.a Dibulatkan per m1 l=5cm :
25.b Dibulatkan per m1 l=10cm :
25.c Dibulatkan per m1 l=15cm :

26 1 m2 Pasang lapisan HPL


1 Bahan
HPL 0.6193 lb 200,103.20
Lem kayu kuning 0.2500 kg 21,222.30
Hampelas 0.2300 lb 6,021.40

2 Tenaga
Pekerja 0.160 oh 89,320.00
Tukang cat 0.160 oh 137,445.00
Kepala tukang 0.016 oh 157,850.00
Mandor 0.0025 oh 157,850.00

Overhead & keu

26 1 m2 Pasang lapisan HPL

A4.7.1. Pek-Cat / HAL 408 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

1,125.00
1,125.00

13,792.63
13,398.00
-
-
394.63
Jumlah 14,917.63
Overhead & keuntungan 10% : 1,491.76
Jumlah : 16,409.39
Dibulatkan : 16,400.00

375.00
375.00

13,792.63
13,398.00
-
-
394.63
Jumlah 14,167.63
Overhead & keuntungan 10% : 1,416.76
Jumlah : 15,584.39
Dibulatkan : 15,500.00

375.00
375.00

14,660.80
13,398.00
-
-
1,262.80
Jumlah 15,035.80
Overhead & keuntungan 10% : 1,503.58
Jumlah : 16,539.38
Dibulatkan : 16,500.00

36,890.70
7,436.00
4,669.50
9,798.80
14,986.40
333.30
594.00
1,204.28

8,910.06
6,252.40
1,237.01
947.10
473.55
Jumlah 45,800.76
A4.7.1. Pek-Cat / HAL 409 DARI 616
SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

Overhead & keuntungan 10% : 4,580.08


Jumlah : 50,380.83
Dibulatkan : 50,300.00

42,078.30
7,436.00
4,669.50
9,798.80
20,174.00
333.30
594.00
1,204.28

21,789.08
6,252.40
14,431.73
631.40
473.55
Jumlah 63,867.38
Overhead & keuntungan 10% : 6,386.74
Jumlah : 70,254.11
Dibulatkan : 70,200.00

A4.7.1. Pek-Cat / HAL 410 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

Err:509
Err:509

8,910.06
6,252.40
1,237.01
947.10
473.55
Jumlah Err:509
Overhead & keuntungan 10% : Err:509
Jumlah : Err:509
Dibulatkan : Err:509

23,442.80
6,750.00
4,650.00
12,042.80

24,990.35
-
21,991.20
2,525.60
473.55
Jumlah 48,433.15
Overhead & keuntungan 10% : 4,843.32
Jumlah : 53,276.47
Dibulatkan : 53,200.00

9,030.04
5,250.00
2,970.00
602.14
207.90

39,202.63
14,291.20
21,991.20
2,525.60
394.63
Jumlah 48,232.67
Overhead & keuntungan 10% : 4,823.27
Jumlah : 53,055.93
Dibulatkan : 53,000.00

13,574.00
2,288.00
3,135.00
8,151.00

11,913.44
1,786.40
A4.7.1. Pek-Cat / HAL 411 DARI 616
SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

8,659.04
994.46
473.55
Jumlah 25,487.44
Overhead & keuntungan 10% : 2,548.74
Jumlah : 28,036.18
Dibulatkan :
28,000.00

( 1 lapis cat dasar, 2 lapis cat penutup )

21,967.00
4,543.00

4,840.00

12,584.00

11,834.52
1,786.40
8,659.04
994.46
394.63
Jumlah 33,801.52
Overhead & keuntungan 10% : 3,380.15
Jumlah : 37,181.67
Dibulatkan :
37,100.00

A4.7.1. Pek-Cat / HAL 412 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)


24,978.80
2,288.00
6,303.00
16,387.80

11,913.44
1,786.40
8,659.04
994.46
473.55
Jumlah 36,892.24
Overhead & keuntungan 10% : 3,689.22
Jumlah : 40,581.46
Dibulatkan :
40,500.00
akteri (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
35,354.00
2,288.00
9,185.00
23,881.00

11,913.44
1,786.40
8,659.04
994.46
473.55
Jumlah 47,267.44
Overhead & keuntungan 10% : 4,726.74
Jumlah : 51,994.18

Dibulatkan :
51,900.00

11,286.00
-
3,135.00
8,151.00

12,587.58
2,233.00
8,933.93
1,026.03
394.63
Jumlah 23,873.58
Overhead & keuntungan 10% : 2,387.36
Jumlah : 26,260.93
Dibulatkan : 26,200.00

17,424.00
-
4,840.00
12,584.00

12,587.58
A4.7.1. Pek-Cat / HAL 413 DARI 616
SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

2,233.00
8,933.93
1,026.03
394.63
Jumlah 30,011.58
Overhead & keuntungan 10% : 3,001.16
Jumlah : 33,012.73
Dibulatkan :
33,000.00
nti bakteri (1 lapis cat dasar, 2 lapis cat penutup)
33,066.00
-
9,185.00
23,881.00

12,587.58
2,233.00
8,933.93
1,026.03
394.63
Jumlah 45,653.58
Overhead & keuntungan 10% : 4,565.36
Jumlah : 50,218.93
Dibulatkan : 50,200.00

A4.7.1. Pek-Cat / HAL 414 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

22,690.80
-
6,303.00
16,387.80

12,587.58
2,233.00
8,933.93
1,026.03
394.63
Jumlah 35,278.38
Overhead & keuntungan 10% : 3,527.84
Jumlah : 38,806.21
Dibulatkan : 38,800.00

9,537.00
-
3,814.80
5,722.20

9,410.17
2,500.96
5,772.69
662.97
473.55
Jumlah 18,947.17
Overhead & keuntungan 10% : 1,894.72
Jumlah : 20,841.89
Dibulatkan : 20,800.00

600.00
600.00

9,331.25
2,500.96
5,772.69
662.97
394.63
Jumlah 9,931.25
Overhead & keuntungan 10% : 993.12
Jumlah : 10,924.37
Dibulatkan : 10,900.00

1,702.14
602.14
500.00
-
600.00

13,945.86
13,398.00
137.45
15.79
394.63
A4.7.1. Pek-Cat / HAL 415 DARI 616
SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

Jumlah 15,648.00
Overhead & keuntungan 10% : 1,564.80
Jumlah : 17,212.79
Dibulatkan : 17,200.00

1,704.28
1,204.28
500.00
1,200.00

4,733.58
3,572.80
687.23
78.93
394.63
Jumlah 6,437.86
Overhead & keuntungan 10% : 643.79
Jumlah : 7,081.64
Dibulatkan : 7,000.00

A4.7.1. Pek-Cat / HAL 416 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

3,925.90
3,718.00
207.90

34,010.90
1,786.40
27,489.00
3,157.00
1,578.50
Jumlah 37,936.80
Overhead & keuntungan 10% : 3,793.68
Jumlah : 41,730.48
Dibulatkan : 41,700.00

8,242.52
3,718.00
207.90
4,316.62

57,990.63
22,330.00
30,925.13
3,551.63
1,183.88
Jumlah 66,233.15
Overhead & keuntungan 10% : 6,623.31
Jumlah : 72,856.46
Dibulatkan : 72,800.00

17,514.62
3,500.00
3,500.00
3,000.00
3,000.00
198.00
4,316.62

6,096.09
535.92
824.67
3,551.63
1,183.88
Jumlah 23,610.71
Overhead & keuntungan 10% : 2,361.07
Jumlah : 25,971.78
Dibulatkan :
25,900.00

22,500.00
22,500.00

6,096.09
A4.7.1. Pek-Cat / HAL 417 DARI 616
SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

535.92
824.67
3,551.63
1,183.88
Jumlah 28,596.09
Overhead & keuntungan 10% : 2,859.61
Jumlah : 31,455.70
Dibulatkan :
31,400.00

27,000.00
8,250.00
12,750.00
6,000.00
27,000.00

233,541.00
44,660.00
109,956.00
47,355.00
31,570.00
Jumlah 260,541.00
Overhead & keuntungan 10% : 26,054.10
Jumlah : 286,595.10

Dibulatkan :
286,500.00

A4.7.1. Pek-Cat / HAL 418 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

ani) secara semprot (airless spray) dengan sistem 1 lapis cat mutakhir dengan tebal 200 um
22,500.00
22,500.00

195,079.50
35,728.00
96,211.50
31,570.00
31,570.00
Jumlah 217,579.50
Overhead & keuntungan 10% : 21,757.95
Jumlah : 239,337.45

Dibulatkan :
239,300.00

399,128.40
89,100.00
70,950.00
57,750.00
105,600.00
39,600.00
36,128.40

2,033,185.00
178,640.00
1,649,340.00
189,420.00
15,785.00
Jumlah 2,432,313.40
Overhead & keuntungan 10% : 243,231.34
Jumlah : 2,675,544.74
Dibulatkan : 2,675,500.00
Dibulatkan : 267,550.00
apis plamir), 1 lapis cat dasar, 3 lapis cat penutup
313,764.00
57,750.00
71,385.60
166,650.00
36,128.40
39,600.00

2,033,185.00
178,640.00
1,649,340.00
189,420.00
15,785.00
Jumlah 2,346,949.00
Overhead & keuntungan 10% : 234,694.90
Jumlah : 2,581,643.90

Dibulatkan :
2,581,600.00

A4.7.1. Pek-Cat / HAL 419 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

Dibulatkan :
258,160.00

9,537.00
3,814.80
5,722.20

9,331.25
2,500.96
5,772.69
662.97
394.63
Jumlah 18,868.25
Overhead & keuntungan 10% : 1,886.82
Jumlah : 20,755.07
Dibulatkan : 20,700.00

A4.7.1. Pek-Cat / HAL 420 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

827,750.00
827,750.00

23,042.25
3,572.80
17,180.63
1,973.13
315.70
Jumlah 850,792.25
Overhead & keuntungan 10% : 85,079.23
Jumlah : 935,871.48
Dibulatkan : 935,800.00
46,790.00
93,580.00
140,370.00

130,610.59
123,920.35
5,305.58
1,384.67

39,202.63
14,291.20
21,991.20
2,525.60
394.63
Jumlah 169,813.21
Overhead & keuntungan 10% : 16,981.32
Jumlah : 186,794.54
Dibulatkan : 186,700.00

A4.7.1. Pek-Cat / HAL 421 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan

1 1 Unit Closet duduk ex. TOTO Type CW 660 NJ / SW660J + Ecowasher TCW 03 SL
a. Bahan:
Closet duduk ex. TOTO Type CW660NJ - SW660J + Ecowa 1.000 set
Perlengkapan 0.06 %
b. Upah:
- Tukang 1.100 hari
- Pekerja 3.300 hari
- Kepala tukang 0.300 hari
- Mandor 0.160 hari

1 1 Unit Closet duduk ex. TOTO Type CW 660 NJ / SW660J + Ecowasher TCW 03 SL
1a 1 Unit Closet duduk setara TOTO Type C704L - SW784JP + Ecowasher TCW 03 SL
a. Bahan:
Closet duduk setara TOTO Type C704L - SW784JP +
Ecowasher TCW 03 SL 1.000 set
Perlengkapan 0.06 %
b. Upah:
- Tukang 1.100 hari
- Pekerja 3.300 hari
- Kepala tukang 0.300 hari
- Mandor 0.160 hari

1a 1 Unit Closet duduk setara TOTO Type C704L - SW784JP + Ecowasher TCW 03 SL
2 1 Unit Closet jongkok ex Toto type CE 9 / TV 150 NWV 12
a. Bahan:
- CE 9 1.000 bh
- Semen 0.120 zak
- Pasir pasang 0.010 m3
b. Upah:
- Tukang 1.500 hari
- Pekerja 1.000 hari
- Kepala tukang 0.300 hari
- Mandor 0.160 hari

2 1 Unit Closet jongkok ex Toto type CE 9 / TV 150 NWV 12


2a 1 Unit Closet jongkok ex. Toto type CE 7
a. Bahan:
- CE 7 1.000 bh
- Semen 0.120 zak
- Pasir pasang 0.010 m3
b. Upah:
- Tukang 1.500 hari
- Pekerja 1.000 hari
- Kepala tukang 0.300 hari
- Mandor 0.160 hari

A.5.1.1.SANITASI / HAL 422 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

2a 1 Unit Closet jongkok ex. Toto type CE 7


4 1 Unit Urinal ex. Toto tipe UW477JNM Muslim type urinal
a. Bahan:
- Urinal UW477JNM Muslim type urinal 1.000 unit
- Semen 0.120 zak
- Pasir pasang 0.010 m3
Perlengkapan 30% Lot
b. Upah:
- Tukang 1.000 hari
- Pekerja 1.000 hari
- Kepala tukang 0.100 hari
- Mandor 0.050 hari

4 1 Unit Urinal ex. Toto tipe UW477JNM Muslim type urinal

A.5.1.1.SANITASI / HAL 423 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

4a 1 Unit Urinal partition ex. Toto tipe AW115J


a. Bahan:
- Urinal partition w/fittings tipe AW115J 1.000 unit
Perlengkapan 6% Lot
b. Upah:
- Tukang 1.000 hari
- Pekerja 1.000 hari
- Kepala tukang 0.100 hari
- Mandor 0.050 hari

4a 1 Unit Urinal partition ex. Toto tipe AW115J


5 1 Unit Wastafel LW649CJ Complete set
a. Bahan:
- LW649CJ 1.000 unit
- TX115LESBR
- TX277S
- THX1A-5N
Semen 0.120 zak
Pasir pasang 0.010 m3
Perlengkapan 12% Lot
b. Upah:
- Tukang 1.450 hari
- Pekerja 1.200 hari
- Kepala tukang 0.150 hari
- Mandor 0.060 hari

5 1 Unit Wastafel LW649CJ Complete set


5a 1 Unit Wastafel setara TOTO tipe LW 246 J
a. Bahan:
- LW 246 J 1.000 unit
- T205QN
- TX277S
- T6JV5
- THX1A-3N
- TX801LN
Perlengkapan 12% Lot
b. Upah:
- Tukang 1.450 hari
- Pekerja 1.200 hari
- Kepala tukang 0.150 hari
- Mandor 0.075 hari

5a 1 Unit Wastafel setara TOTO tipe LW 246 J


5b 1 Unit Wastafel setara TOTO tipe LW 103 JT1
a. Bahan:
- LW 103 JT1 1.000 unit
- T205QN
- TX277S
- TX709AN
A.5.1.1.SANITASI / HAL 424 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- TL220D
Perlengkapan 12% Lot
b. Upah:
- Tukang 1.450 hari
- Pekerja 1.200 hari
- Kepala tukang 0.150 hari
- Mandor 0.075 hari

5b 1 Unit Wastafel setara TOTO tipe LW 103 JT1

12 1 Unit Kitchen zink setara Standar Royal tipe caroline 1 lobang complete set
a. Bahan:
Kitchen zink setara Standar Royal tipe caroline 1 lobang
complete set 1.000 unit
b. Upah:
- Pekerja 0.150 hari
- Tukang 0.300 hari
- Kepala tukang 0.030 oh
- Mandor 0.0015 hari

12 1 Unit Kitchen zink setara Standar Royal tipe caroline 1 lobang complete set

A.5.1.1.SANITASI / HAL 425 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

12a 1 Unit Kitchen zink setara Standar Royal tipe Elizabeth 2 lobang complete set
a. Bahan:
Kitchen zink setara Standar Royal tipe Elizabeth 2 lobang
complete set 1.000 unit
b. Upah:
- Tukang 0.300 hari
- Pekerja 0.150 hari
- Kepala tukang 0.030 hari
- Mandor 0.0015 hari

12a 1 Unit Kitchen zink setara Standar Royal tipe Elizabeth 2 lobang complete set

12b 1 Unit Kitchen zink setara Standar Royal tipe angela 1 lobang complete set
a. Bahan:
Kitchen zink setara Standar Royal tipe angela 1 lobang
complete set 1.000 unit
b. Upah:
- Tukang 1.450 hari
- Pekerja 0.725 hari
- Kepala tukang 0.145 hari
- Mandor 0.073 hari

12b 1 Unit Kitchen zink setara Standar Royal tipe angela 1 lobang complete set
12c 1 Unit Laundry sink setara TOTO tipe SK322E-T30ARQ13N
a. Bahan:
Laundry sink setara TOTO tipe SK322E-T30ARQ13N 1.000 unit
b. Upah:
- Tukang 1.450 hari
- Pekerja 0.725 hari
- Kepala tukang 0.145 hari
- Mandor 0.073 hari

12c 1 Unit Laundry sink setara TOTO tipe SK322E-T30ARQ13N

12d 1 Unit Service sink setara TOTO tipe SK508-T30ARQ13N


a. Bahan:
Service sink setara TOTO tipe SK508-T30ARQ13N 1.000 unit
b. Upah:
- Tukang 1.450 hari
- Pekerja 0.725 hari
- Kepala tukang 0.145 hari
- Mandor 0.073 hari

12d 1 Unit Service sink setara TOTO tipe SK508-T30ARQ13N

12e 1 Unit Sloop sink setara TOTO tipe SK33-T30ARQ13N


a. Bahan:
Sloop sink setara TOTO tipe SK33-T30ARQ13N 1.000 unit

A.5.1.1.SANITASI / HAL 426 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

b. Upah:
- Tukang 1.450 hari
- Pekerja 0.725 hari
- Kepala tukang 0.145 hari
- Mandor 0.073 hari

12e 1 Unit Sloop sink setara TOTO tipe SK33-T30ARQ13N

14 1 Unit Floor drain Ex TOTO Type TX 1 BN


a. Bahan:
Floor drain TX 1 BN 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14 1 Unit Floor drain Ex TOTO Type TX 1 BN

A.5.1.1.SANITASI / HAL 427 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

14a 1 bh Kran dinding setara TOTO tipe T23BQ13N


a. Bahan:
Kran dinding T 23B 13V7N 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14a 1 bh Kran dinding setara TOTO tipe T23BQ13N

14b 1 bh Kran zink dinding setara TOTO tipe T30ARQ13N


a. Bahan:
Kran zink dinding setara TOTO tipe T30ARQ13N 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14b 1 bh Kran zink dinding setara TOTO tipe T30ARQ13N

14c 1 Unit Shower Spray TB19CSMCR


a. Bahan:
Shower Spray TB19CSMCR 1.000 unit
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14c 1 Unit Shower Spray TB19CSMCR


14d 1 Unit Hand shower setara TOTO tipe TX471SFMBR
a. Bahan:
Hand shower setara TOTO tipe TX471SFMBR 1.000 unit
b. Upah:
- Tukang 0.150 hari
- Pekerja 0.075 hari
- Kepala tukang 0.015 hari
- Mandor 0.005 hari

14d 1 Unit Hand shower setara TOTO tipe TX471SFMBR

14e 1 Unit Fixed Shower Head setara TOTO tipe TX465SMN + TX452SO
a. Bahan:
Fixed Shower Head setara TOTO tipe TX465SMN + TX452 1.000 unit
b. Upah:
- Tukang 0.150 hari

A.5.1.1.SANITASI / HAL 428 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- Pekerja 0.075 hari


- Kepala tukang 0.015 hari
- Mandor 0.005 hari

14e 1 Unit Fixed Shower Head setara TOTO tipe TX465SMN + TX452SO

14f 1 Unit Paper holder ex. Toto tipe TX703AG


a. Bahan:
- TX703AG 1.000 bh
b. Upah:
- Tukang 0.055 hari
- Pekerja 0.028 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14f 1 Unit Paper holder ex. Toto tipe TX703AG

A.5.1.1.SANITASI / HAL 429 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

14g 1 Unit Grab bar Nylon setara tipe KFS 5A-600


a. Bahan:
Grab bar Nylon setara tipe KFS 5A-600 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14g 1 Unit Grab bar Nylon setara tipe KFS 5A-600


14h 1 Unit Grab bar Nylon setara tipe KFS 5B3
a. Bahan:
Grab bar Nylon setara tipe KFS 5B3 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14h 1 Unit Grab bar Nylon setara tipe KFS 5B3


14i 1 Unit Grab bar Nylon setara tipe KFS 6A
a. Bahan:
Grab bar Nylon setara tipe KFS 6A 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14i 1 Unit Grab bar Nylon setara tipe KFS 6A


14j 1 Unit Grab bar Nylon setara tipe KFS 6D-400
a. Bahan:
Grab bar Nylon setara tipe KFS 6D-400 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14j 1 Unit Grab bar Nylon setara tipe KFS 6D-400


14k 1 Unit Grab bar Nylon setara tipe KFS 5A-400
a. Bahan:
Grab bar Nylon setara tipe KFS 5A-400 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
A.5.1.1.SANITASI / HAL 430 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- Kepala tukang 0.010 hari


- Mandor 0.005 hari

14k 1 Unit Grab bar Nylon setara tipe KFS 5A-400


14l 1 Unit Kursi lipat setara tipe KFS 8A
a. Bahan:
Kursi lipat setara tipe KFS 8A 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14l 1 Unit Kursi lipat setara tipe KFS 8A

A.5.1.1.SANITASI / HAL 431 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

14m 1 Unit Double Robe Hook ex. TOTO Type TS 118 WS


a. Bahan:
- Double Robe Hook TOTO Type TS 118 WS 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14m 1 Unit Double Robe Hook ex. TOTO Type TS 118 WS


14n 1 Unit Towel bar setara TOTO tipe TX 4C (L=660 mm)
a. Bahan:
Towel bar setara TOTO tipe TX 4C (L=660 mm) 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14n 1 Unit Towel bar setara TOTO tipe TX 4C (L=660 mm)

14o 1 Unit Soap holder/Tempat sabun setara TOTO tipeS 156 NV1
a. Bahan:
Soap holder/Tempat sabun setara TOTO tipeS 156 NV1 1.000 bh
b. Upah:
- Tukang 0.055 hari
- Pekerja 0.028 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14o 1 Unit Soap holder/Tempat sabun setara TOTO tipeS 156 NV1
14p 1 Unit Grab bar Nylon setara tipe KFS 7C
a. Bahan:
Grab bar Nylon setara tipe KFS 7C 1.000 bh
b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14p 1 Unit Grab bar Nylon setara tipe KFS 7C

14 1 Unit Roof drain cast iron


a. Bahan:
Roof drain cast iron 1.000 bh

A.5.1.1.SANITASI / HAL 432 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

b. Upah:
- Tukang 0.100 hari
- Pekerja 0.050 hari
- Kepala tukang 0.010 hari
- Mandor 0.005 hari

14 1 Unit Roof drain cast iron

A.5.1.1.SANITASI / HAL 433 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

6,599,560.00
6,226,000.00 6,226,000.00
6,226,000.00 373,560
518,556.50
137,445.00 151,189.50
89,320.00 294,756.00
157,850.00 47,355.00
157,850.00 25,256.00
Jumlah 7,118,116.50
Overhead & keuntungan 10% : 711,811.65
Jumlah : 7,829,928.15
Dibulatkan : 7,829,900.00

8,395,200.00

7,920,000.00 7,920,000.00
7,920,000.00 475,200
518,556.50
137,445.00 151,189.50
89,320.00 294,756.00
157,850.00 47,355.00
157,850.00 25,256.00
Jumlah 8,913,756.50
Overhead & keuntungan 10% : 891,375.65
Jumlah : 9,805,132.15
Dibulatkan : 9,805,100.00

3,496,687.70
3,487,000.000 3,487,000.00
66,110.000 7,933.20
175,450.000 1,754.50
368,098.50
137,445.00 206,167.50
89,320.00 89,320.00
157,850.00 47,355.00
157,850.00 25,256.00
Jumlah 3,864,786.20
Overhead & keuntungan 10% : 386,478.62
Jumlah : 4,251,264.82
Dibulatkan : 4,251,200.00

317,687.70
308,000.000 308,000.00
66,110.000 7,933.20
175,450.000 1,754.50
368,098.50
137,445.00 206,167.50
89,320.00 89,320.00
157,850.00 47,355.00
157,850.00 25,256.00
Jumlah 685,786.20
A.5.1.1.SANITASI / HAL 434 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Overhead & keuntungan 10% : 68,578.62


Jumlah : 754,364.82
Dibulatkan : 754,300.00

6,959,487.70
5,346,000.000 5,346,000.00
66,110.000 7,933.20
175,450.000 1,754.50
5,346,000.00 1,603,800
250,442.50
137,445.00 137,445.00
89,320.00 89,320.00
157,850.00 15,785.00
157,850.00 7,892.50
Jumlah 7,209,930.20
Overhead & keuntungan 10% : 720,993.02
Jumlah : 7,930,923.22
Dibulatkan : 7,930,900.00

A.5.1.1.SANITASI / HAL 435 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

1,597,420.00
1,507,000.000 1,507,000.00
1,507,000.00 90,420
250,442.50
137,445.00 137,445.00
89,320.00 89,320.00
157,850.00 15,785.00
157,850.00 7,892.50
Jumlah 1,847,862.50
Overhead & keuntungan 10% : 184,786.25
Jumlah : 2,032,648.75
Dibulatkan : 2,032,600.00

3,949,623.70
3,517,800.000 3,517,800.00

66,110.000 7,933.20
175,450.000 1,754.50
3,517,800.00 422,136
339,627.75
137,445.00 199,295.25
89,320.00 107,184.00
157,850.00 23,677.50
157,850.00 9,471.00
Jumlah 4,289,251.45
Overhead & keuntungan 10% : 428,925.15
Jumlah : 4,718,176.60
Dibulatkan : 4,718,100.00

3,873,408.00
3,458,400.000 3,458,400.00

3,458,400.00 415,008
341,995.50
137,445.00 199,295.25
89,320.00 107,184.00
157,850.00 23,677.50
157,850.00 11,838.75
Jumlah 4,215,403.50
Overhead & keuntungan 10% : 421,540.35
Jumlah : 4,636,943.85
Dibulatkan : 4,636,900.00

3,617,152.00
3,229,600.000 3,229,600.00

A.5.1.1.SANITASI / HAL 436 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

3,229,600.00 387,552
341,995.50
137,445.00 199,295.25
89,320.00 107,184.00
157,850.00 23,677.50
157,850.00 11,838.75
Jumlah 3,959,147.50
Overhead & keuntungan 10% : 395,914.75
Jumlah : 4,355,062.25
Dibulatkan : 4,355,000.00

532,812.50

532,812.50 532,812.50
59,603.78
89,320.00 13,398.00
137,445.00 41,233.50
157,850.00 4,735.50
157,850.00 236.78
Jumlah 592,416.28
Overhead & keuntungan 10% : 59,241.63
Jumlah : 651,657.90
Dibulatkan : 651,600.00

A.5.1.1.SANITASI / HAL 437 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

893,750.00

893,750.00 893,750.00
59,603.78
137,445.00 41,233.50
89,320.00 13,398.00
157,850.00 4,735.50
157,850.00 236.78
Jumlah 953,353.78
Overhead & keuntungan 10% : 95,335.38
Jumlah : 1,048,689.15
Dibulatkan : 1,048,600.00

446,875.00

446,875.00 446,875.00
298,384.63
137,445.00 199,295.25
89,320.00 64,757.00
157,850.00 22,888.25
157,850.00 11,444.13
Jumlah 745,259.63
Overhead & keuntungan 10% : 74,525.96
Jumlah : 819,785.59
Dibulatkan : 819,700.00

10,692,000.00
10,692,000.00 10,692,000.00
298,384.63
137,445.00 199,295.25
89,320.00 64,757.00
157,850.00 22,888.25
157,850.00 11,444.13
Jumlah 10,990,384.63
Overhead & keuntungan 10% : 1,099,038.46
Jumlah : 12,089,423.09
Dibulatkan : 12,089,400.00

4,620,000.00
4,620,000.00 4,620,000.00
298,384.63
137,445.00 199,295.25
89,320.00 64,757.00
157,850.00 22,888.25
157,850.00 11,444.13
Jumlah 4,918,384.63
Overhead & keuntungan 10% : 491,838.46
Jumlah : 5,410,223.09
Dibulatkan : 5,410,200.00

7,953,000.00
7,953,000.00 7,953,000.00

A.5.1.1.SANITASI / HAL 438 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

298,384.63
137,445.00 199,295.25
89,320.00 64,757.00
157,850.00 22,888.25
157,850.00 11,444.13
Jumlah 8,251,384.63
Overhead & keuntungan 10% : 825,138.46
Jumlah : 9,076,523.09
Dibulatkan : 9,076,500.00

502,700.00
502,700.000 502,700.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 523,278.25
Overhead & keuntungan 10% : 52,327.83
Jumlah : 575,606.08
Dibulatkan : 575,600.00

A.5.1.1.SANITASI / HAL 439 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

464,200.00
464,200.000 464,200.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 484,778.25
Overhead & keuntungan 10% : 48,477.83
Jumlah : 533,256.08
Dibulatkan : 533,200.00

682,000.00
682,000.000 682,000.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 702,578.25
Overhead & keuntungan 10% : 70,257.83
Jumlah : 772,836.08
Dibulatkan : 772,800.00

962,500.00
962,500.000 962,500.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 983,078.25
Overhead & keuntungan 10% : 98,307.83
Jumlah : 1,081,386.08
Dibulatkan : 1,081,300.00

3,520,000.00
3,520,000.000 3,520,000.00
30,472.75
137,445.00 20,616.75
89,320.00 6,699.00
157,850.00 2,367.75
157,850.00 789.25
Jumlah 3,550,472.75
Overhead & keuntungan 10% : 355,047.28
Jumlah : 3,905,520.03
Dibulatkan : 3,905,500.00

1,962,400.00
1,962,400.000 1,962,400.00
30,472.75
137,445.00 20,616.75

A.5.1.1.SANITASI / HAL 440 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

89,320.00 6,699.00
157,850.00 2,367.75
157,850.00 789.25
Jumlah 1,992,872.75
Overhead & keuntungan 10% : 199,287.28
Jumlah : 2,192,160.03
Dibulatkan : 2,192,100.00

638,000.00
638,000.000 638,000.00
12,383.53
137,445.00 7,559.48
89,320.00 2,456.30
157,850.00 1,578.50
157,850.00 789.25
Jumlah 650,383.53
Overhead & keuntungan 10% : 65,038.35
Jumlah : 715,421.88
Dibulatkan : 715,400.00

A.5.1.1.SANITASI / HAL 441 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

1,089,000.00
1,089,000.000 1,089,000.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 1,109,578.25
Overhead & keuntungan 10% : 110,957.83
Jumlah : 1,220,536.08
Dibulatkan : 1,220,500.00

5,445,000.00
5,445,000.000 5,445,000.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 5,465,578.25
Overhead & keuntungan 10% : 546,557.83
Jumlah : 6,012,136.08
Dibulatkan : 6,012,100.00

4,015,000.00
4,015,000.000 4,015,000.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 4,035,578.25
Overhead & keuntungan 10% : 403,557.83
Jumlah : 4,439,136.08
Dibulatkan : 4,439,100.00

1,815,000.00
1,815,000.000 1,815,000.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 1,835,578.25
Overhead & keuntungan 10% : 183,557.83
Jumlah : 2,019,136.08
Dibulatkan : 2,019,100.00

1,028,500.00
1,028,500.000 1,028,500.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
A.5.1.1.SANITASI / HAL 442 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

157,850.00 1,578.50
157,850.00 789.25
Jumlah 1,049,078.25
Overhead & keuntungan 10% : 104,907.83
Jumlah : 1,153,986.08
Dibulatkan : 1,153,900.00

1,996,500.00
1,996,500.000 1,996,500.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 2,017,078.25
Overhead & keuntungan 10% : 201,707.83
Jumlah : 2,218,786.08
Dibulatkan : 2,218,700.00

A.5.1.1.SANITASI / HAL 443 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

201,300.00
201,300.000 201,300.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 221,878.25
Overhead & keuntungan 10% : 22,187.83
Jumlah : 244,066.08
Dibulatkan : 244,000.00

1,903,000.00
1,903,000.000 1,903,000.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 1,923,578.25
Overhead & keuntungan 10% : 192,357.83
Jumlah : 2,115,936.08
Dibulatkan : 2,115,900.00

275,000.00
275,000.000 275,000.00
12,383.53
137,445.00 7,559.48
89,320.00 2,456.30
157,850.00 1,578.50
157,850.00 789.25
Jumlah 287,383.53
Overhead & keuntungan 10% : 28,738.35
Jumlah : 316,121.88
Dibulatkan : 316,100.00

2,178,000.00
2,178,000.000 2,178,000.00
20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 2,198,578.25
Overhead & keuntungan 10% : 219,857.83
Jumlah : 2,418,436.08
Dibulatkan : 2,418,400.00

-
- -

A.5.1.1.SANITASI / HAL 444 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

20,578.25
137,445.00 13,744.50
89,320.00 4,466.00
157,850.00 1,578.50
157,850.00 789.25
Jumlah 20,578.25
Overhead & keuntungan 10% : 2,057.83
Jumlah : 22,636.08
Dibulatkan : 22,600.00

A.5.1.1.SANITASI / HAL 445 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

A.5.1.1 PEKERJAAN PEMIPAAN DALAM GEDUNG


PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
25 1 M1 Memasang Pipa PVC Tipe AW Ø 1/2"
Bahan
Pipa PVC Ø 1/2" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.036 0rg/hr
Tukang Pipa 0.060 0rg/hr
Kepala Tukang 0.006 0rg/hr
Mandor 0.002 0rg/hr

25 1 M1 Memasang Pipa PVC Tipe AW Ø 1/2"

26 1 M1 Memasang Pipa PVC Tipe AW Ø 3/4"


Bahan
Pipa PVC Ø 3/4" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.036 0rg/hr
Tukang Pipa 0.060 0rg/hr
Kepala Tukang 0.006 0rg/hr
Mandor 0.002 0rg/hr

26 1 M1 Memasang Pipa PVC Tipe AW Ø 3/4"

27 1 M1 Memasang Pipa PVC Tipe AW Ø 1"


Bahan
Pipa PVC Ø 1" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.036 0rg/hr
Tukang Pipa 0.060 0rg/hr
Kepala Tukang 0.006 0rg/hr
Mandor 0.002 0rg/hr

27 1 M1 Memasang Pipa PVC Tipe AW Ø 1"


27a 1 M1 Memasang Pipa PVC Tipe AW Ø 1 1/4"
Bahan
Pipa PVC Ø 1 1/4" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.036 0rg/hr
Tukang Pipa 0.060 0rg/hr
Kepala Tukang 0.006 0rg/hr
Mandor 0.002 0rg/hr

27a 1 M1 Memasang Pipa PVC Tipe AW Ø 1 1/4"


A.5.1.1 Pek. Pemipaan / HAL 446 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

28 1 M1 Memasang Pipa PVC Tipe AW Ø 1 1/2"


Bahan
Pipa PVC Ø 1 1/2" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.054 0rg/hr
Tukang Pipa 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.003 0rg/hr

28 1 M1 Memasang Pipa PVC Tipe AW Ø 1 1/2"

29 1 M1 Memasang Pipa PVC Tipe AW Ø 2"


Bahan
Pipa PVC Ø 2" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.054 0rg/hr
Tukang Pipa 0.090 0rg/hr
Kepala Tukang 0.009 0rg/hr
Mandor 0.003 0rg/hr

29 1 M1 Memasang Pipa PVC Tipe AW Ø 2"


30 1 M1 Memasang Pipa PVC Tipe AW Ø 2 1/2"
Bahan
Pipa PVC Ø 2 1/2" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.050 0rg/hr
Tukang Pipa 0.099 0rg/hr
Kepala Tukang 0.010 0rg/hr
Mandor 0.010 0rg/hr

30 1 M1 Memasang Pipa PVC Tipe AW Ø 2 1/2"


31 1 M1 Memasang Pipa PVC Tipe AW Ø 3"
Bahan
Pipa PVC Ø 3" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.054 0rg/hr
Tukang Pipa 0.109 0rg/hr
Kepala Tukang 0.011 0rg/hr
Mandor 0.011 0rg/hr

31 1 M1 Memasang Pipa PVC Tipe AW Ø 3"

32 1 M1 Memasang Pipa PVC Tipe AW Ø 4"

A.5.1.1 Pek. Pemipaan / HAL 447 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

Bahan
Pipa PVC Ø 4" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.060 0rg/hr
Tukang Pipa 0.120 0rg/hr
Kepala Tukang 0.012 0rg/hr
Mandor 0.012 0rg/hr

32 1 M1 Memasang Pipa PVC Tipe AW Ø 4"

A.5.1.1 Pek. Pemipaan / HAL 448 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

32a 1 M1 Memasang Pipa PVC Tipe AW Ø 5"


Bahan
Pipa PVC Ø 5" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.066 0rg/hr
Tukang Pipa 0.132 0rg/hr
Kepala Tukang 0.013 0rg/hr
Mandor 0.013 0rg/hr

32a 1 M1 Memasang Pipa PVC Tipe AW Ø 5"

32b 1 M1 Memasang Pipa PVC Tipe AW Ø 6"


Bahan
Pipa PVC Ø 6" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.072 0rg/hr
Tukang Pipa 0.145 0rg/hr
Kepala Tukang 0.014 0rg/hr
Mandor 0.014 0rg/hr

32b 1 M1 Memasang Pipa PVC Tipe AW Ø 6"

32c 1 M1 Memasang Pipa PVC Tipe AW Ø 8"


Bahan
Pipa PVC Ø 8" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.080 0rg/hr
Tukang Pipa 0.159 0rg/hr
Kepala Tukang 0.016 0rg/hr
Mandor 0.016 0rg/hr

32c 1 M1 Memasang Pipa PVC Tipe AW Ø 8"

32d 1 M1 Memasang Pipa PVC Tipe AW Ø 10"


Bahan
Pipa PVC Ø 10" 1.200 m'
Perlengkapan 35% Harga Pipa 1.000 Ls
Tenaga Kerja
Pekerja 0.088 0rg/hr
Tukang Pipa 0.175 0rg/hr
Kepala Tukang 0.018 0rg/hr
Mandor 0.018 0rg/hr

32d 1 M1 Memasang Pipa PVC Tipe AW Ø 10"

A.5.1.1 Pek. Pemipaan / HAL 449 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH

5 6 7

52,034.40
32,120.00 38,544.00
13,490.40 13,490.40
12,725.02
89,320.00 3,215.52
137,445.00 8,246.70
157,850.00 947.10
157,850.00 315.70
Jumlah 64,759.42
Overhead & keuntungan 10% : 6,475.94
Jumlah : 71,235.36
Dibulatkan : 71,200.00

57,736.80
35,640.00 42,768.00
14,968.80 14,968.80
12,725.02
89,320.00 3,215.52
137,445.00 8,246.70
157,850.00 947.10
157,850.00 315.70
Jumlah 70,461.82
Overhead & keuntungan 10% : 7,046.18
Jumlah : 77,508.00
Dibulatkan : 77,500.00

76,269.60
47,080.00 56,496.00
19,773.60 19,773.60
12,725.02
89,320.00 3,215.52
137,445.00 8,246.70
157,850.00 947.10
157,850.00 315.70
Jumlah 88,994.62
Overhead & keuntungan 10% : 8,899.46
Jumlah : 97,894.08
Dibulatkan : 97,800.00

94,802.40
58,520.00 70,224.00
24,578.40 24,578.40
12,725.02
89,320.00 3,215.52
137,445.00 8,246.70
157,850.00 947.10
157,850.00 315.70
Jumlah 107,527.42
Overhead & keuntungan 10% : 10,752.74
Jumlah : 118,280.16
Dibulatkan : 118,200.00
A.5.1.1 Pek. Pemipaan / HAL 450 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH

5 6 7

98,366.40
60,720.00 72,864.00
25,502.40 25,502.40
19,087.53
89,320.00 4,823.28
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 473.55
Jumlah 117,453.93
Overhead & keuntungan 10% : 11,745.39
Jumlah : 129,199.32
Dibulatkan : 129,100.00

138,996.00
85,800.00 102,960.00
36,036.00 36,036.00
19,087.53
89,320.00 4,823.28
137,445.00 12,370.05
157,850.00 1,420.65
157,850.00 473.55
Jumlah 158,083.53
Overhead & keuntungan 10% : 15,808.35
Jumlah : 173,891.88
Dibulatkan : 173,800.00

197,445.60
121,880.00 146,256.00
51,189.60 51,189.60
21,153.83
89,320.00 4,421.34
137,445.00 13,607.06
157,850.00 1,562.72
157,850.00 1,562.72
Jumlah 218,599.43
Overhead & keuntungan 10% : 21,859.94
Jumlah : 240,459.37
Dibulatkan : 240,400.00

277,992.00
171,600.00 205,920.00
72,072.00 72,072.00
23,269.21
89,320.00 4,863.47
137,445.00 14,967.76
157,850.00 1,718.99
157,850.00 1,718.99
Jumlah 301,261.21
Overhead & keuntungan 10% : 30,126.12
Jumlah : 331,387.33
Dibulatkan : 331,300.00

A.5.1.1 Pek. Pemipaan / HAL 451 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH

5 6 7

385,624.80
238,040.00 285,648.00
99,976.80 99,976.80
25,596.13
89,320.00 5,349.82
137,445.00 16,464.54
157,850.00 1,890.89
157,850.00 1,890.89
Jumlah 411,220.93
Overhead & keuntungan 10% : 41,122.09
Jumlah : 452,343.02
Dibulatkan : 452,300.00

A.5.1.1 Pek. Pemipaan / HAL 452 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH

5 6 7

768,754.80
474,540.00 569,448.00
199,306.80 199,306.80
28,155.74
89,320.00 5,884.80
137,445.00 18,110.99
157,850.00 2,079.97
157,850.00 2,079.97
Jumlah 796,910.54
Overhead & keuntungan 10% : 79,691.05
Jumlah : 876,601.60
Dibulatkan : 876,600.00

1,151,884.80
711,040.00 853,248.00
298,636.80 298,636.80
30,971.32
89,320.00 6,473.28
137,445.00 19,922.09
157,850.00 2,287.97
157,850.00 2,287.97
Jumlah 1,182,856.12
Overhead & keuntungan 10% : 118,285.61
Jumlah : 1,301,141.73
Dibulatkan : 1,301,100.00

2,102,760.00
### 1,557,600.00
545,160.00 545,160.00
34,068.45
89,320.00 7,120.61
137,445.00 21,914.30
157,850.00 2,516.77
157,850.00 2,516.77
Jumlah 2,136,828.45
Overhead & keuntungan 10% : 213,682.84
Jumlah : 2,350,511.29
Dibulatkan : 2,350,500.00

3,812,054.40
### 2,823,744.00
988,310.40 988,310.40
37,475.29
89,320.00 7,832.67
137,445.00 24,105.73
157,850.00 2,768.44
157,850.00 2,768.44
Jumlah 3,849,529.69
Overhead & keuntungan 10% : 384,952.97
Jumlah : 4,234,482.66
Dibulatkan : 4,234,400.00

A.5.1.1 Pek. Pemipaan / HAL 453 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

A.6.1.1 PEKERJAAN SALURAN LUAR


1 1m' Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
a. Bahan
- Pipa tanah 1.600 bh
- Semen portland 0.014 zak
- Pasir pasang 0.013 m3
- Pasir urug 0.011 m3
b. Tenaga
- Pekerja 0.060 oh
- Tukang batu 0.030 oh
- Kepala tukang 0.003 oh
- Mandor 0.003 oh

1 1m' Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
2 1m' Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
a. Bahan
- Pipa tanah dia 1/2 20 cm 1.600 bh
- Semen portland 0.017 zak
- Pasir pasang 0.014 m3
- Pasir urug 0.014 m3
b. Tenaga
- Pekerja 0.080 oh
- Tukang batu 0.040 oh
- Kepala tukang 0.004 oh
- Mandor 0.007 oh

2 1m' Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
3 1m' Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 20 cm
a. Bahan
Pipa beton dia 1/2 20 cm 1.100 bh
Semen portland 0.017 zak
Pasir pasang 0.014 m3
Pasir urug 0.014 m3
b. Tenaga
- Pekerja 0.080 oh
- Tukang batu 0.040 oh
- Kepala tukang 0.004 oh
- Mandor 0.007 oh

3 1m' Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 20 cm
4 1m' Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 30 cm
a. Bahan
Pipa beton dia 1/2 30 cm 1.100 bh
Semen portland 0.078 zak
Pasir pasang 0.016 m3
Pasir urug 0.016 m3
b. Tenaga
- Pekerja 0.080 oh
- Tukang batu 0.040 oh
- Kepala tukang 0.004 oh
- Mandor 0.007 oh
A.6.1.1 SALURAN LUAR / HAL 454 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

4 1m' Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 30 cm
5 1m' Memasang pipa beton, diameter 15 cm - 20 cm
a. Bahan
- Pipa beton 1.100 bh
- Batu bata 0.027 m3
- Semen portland 0.078 zak
- Pasir pasang 0.056 m3
- Pasir urug 0.024 m3
b. Tenaga
- Pekerja 0.140 oh
- Tukang batu 0.070 oh
- Kepala tukang 0.007 oh
- Mandor 0.007 oh

5 1m' Memasang pipa beton, diameter 15 cm - 20 cm

A.6.1.1 SALURAN LUAR / HAL 455 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

6 1m' Memasang pipa beton, diameter 30 cm SNI - Edisi -2007


a. Bahan
- Pipa beton 1.100 bh
- Batu bata 0.041 m3
- Semen portland 0.118 zak
- Pasir pasang 0.084 m3
- Pasir urug 0.036 m3
b. Tenaga
- Pekerja 0.210 oh
- Tukang batu 0.105 oh
- Kepala tukang 0.011 oh
- Mandor 0.011 oh

6 1m' Memasang pipa beton, diameter 30 cm SNI - Edisi -2007


7 1m' Memasang pipa beton, diameter 40 cm
a. Bahan
- Pipa beton 1.100 bh
- Batu bata 0.061 m3
- Semen portland 0.176 zak
- Pasir pasang 0.126 m3
- Pasir urug 0.054 m3
b. Tenaga
- Pekerja 0.315 oh
- Tukang batu 0.158 oh
- Kepala tukang 0.016 oh
- Mandor 0.016 oh

7 1m' Memasang pipa beton, diameter 40 cm


8 1m' Memasang pipa beton, diameter 50 cm
a. Bahan
- Pipa beton 1.100 bh
- Batu bata 0.091 m3
- Semen portland 0.265 zak
- Pasir pasang 0.189 m3
- Pasir urug 0.081 m3
b. Tenaga
- Pekerja 0.473 oh
- Tukang batu 0.236 oh
- Kepala tukang 0.024 oh
- Mandor 0.024 oh

8 1m' Memasang pipa beton, diameter 50 cm


9 1m' Memasang pipa beton, diameter 60 cm
a. Bahan
- Pipa beton 1.100 bh
- Batu bata 0.109 m3
- Semen portland 0.318 zak
- Pasir pasang 0.227 m3
- Pasir urug 0.097 m3
b. Tenaga

A.6.1.1 SALURAN LUAR / HAL 456 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- Pekerja 0.567 oh
- Tukang batu 0.284 oh
- Kepala tukang 0.028 oh
- Mandor 0.028 oh

9 1m' Memasang pipa beton, diameter 60 cm


10 1m' Memasang pipa beton, diameter 70 cm
a. Bahan
- Pipa beton 1.100 bh
- Batu bata 0.128 m3
- Semen portland 0.370 zak
- Pasir pasang 0.265 m3
- Pasir urug 0.113 m3
b. Tenaga
- Pekerja 0.662 oh
- Tukang batu 0.331 oh
- Kepala tukang 0.033 oh
- Mandor 0.033 oh

10 1m' Memasang pipa beton, diameter 70 cm

A.6.1.1 SALURAN LUAR / HAL 457 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

11 1m' Memasang pipa beton, diameter 80 cm


a. Bahan
- Pipa beton 1.100 bh
- Batu bata 0.146 m3
- Semen portland 0.423 zak
- Pasir pasang 0.302 m3
- Pasir urug 0.130 m3
b. Tenaga
- Pekerja 0.756 oh
- Tukang batu 0.378 oh
- Kepala tukang 0.038 oh
- Mandor 0.038 oh

11 1m' Memasang pipa beton, diameter 80 cm


12 1m' Memasang pipa beton, diameter 100 cm
a. Bahan
- Pipa beton 1.100 bh
- Batu bata 0.182 m3
- Semen portland 0.529 zak
- Pasir pasang 0.378 m3
- Pasir urug 0.162 m3
b. Tenaga
- Pekerja 0.945 oh
- Tukang batu 0.473 oh
- Kepala tukang 0.047 oh
- Mandor 0.047 oh

12 1m' Memasang pipa beton, diameter 100 cm


13 1m' Memasang Pemasangan Precast U- 200 x 300 cm
a. Terpasang
- Pasir urug 0.020 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.020 m3
b. Bahan
- U-DITCH 200x300mm 1.100 bh
c. Tenaga
- Pekerja 0.380 oh
- Tukang batu 0.190 oh
- Kepala tukang 0.019 oh
- Mandor 0.019 oh

13 1m' Memasang Pemasangan Precast U- 200 x 300 cm


14 1m' Memasang Pemasangan Precast U- 300 x 400 cm
a. Terpasang
- Pasir urug 0.025 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.025 m3
b. Bahan
- U-DITCH 300x400mm 1.100 bh
c. Tenaga
- Pekerja 0.380 oh
- Tukang batu 0.190 oh
A.6.1.1 SALURAN LUAR / HAL 458 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- Kepala tukang 0.019 oh


- Mandor 0.019 oh

14 1m' Memasang Pemasangan Precast U- 300 x 400 cm


15 1m' Memasang Pemasangan Precast U- 400 x 600 cm
a. Terpasang
- Pasir urug 0.030 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.030 m3
b. Bahan
- U-DITCH 400x600mm 1.100 bh
c. Tenaga
- Pekerja 0.418 oh
- Tukang batu 0.209 oh
- Kepala tukang 0.021 oh
- Mandor 0.021 oh

15 1m' Memasang Pemasangan Precast U- 400 x 600 cm

A.6.1.1 SALURAN LUAR / HAL 459 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

16 1m' Memasang Pemasangan Precast U- 500 x 700 cm


a. Terpasang
- Pasir urug 0.035 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.035 m3
b. Bahan
- U-DITCH 500x600mm 1.100 bh
c. Tenaga
- Pekerja 0.460 oh
- Tukang batu 0.230 oh
- Kepala tukang 0.023 oh
- Mandor 0.023 oh

16 1m' Memasang Pemasangan Precast U- 500 x 700 cm


17 1m' Memasang Pemasangan Precast U- 600 x 800 cm
a. Terpasang
- Pasir urug 0.040 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.040 m3
b. Bahan
- U-DITCH600x800mm 1.100 bh
c. Tenaga
- Pekerja 0.506 oh
- Tukang batu 0.253 oh
- Kepala tukang 0.025 oh
- Mandor 0.025 oh

17 1m' Memasang Pemasangan Precast U- 600 x 800 cm


18 1m' Memasang Pemasangan Precast U- 700 x 900 cm
a. Terpasang
- Pasir urug 0.045 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.045 m3
b. Bahan
- U-DITCH 500x600mm 1.100 bh
c. Tenaga
- Pekerja 0.556 oh
- Tukang batu 0.278 oh
- Kepala tukang 0.028 oh
- Mandor 0.028 oh

18 1m' Memasang Pemasangan Precast U- 700 x 900 cm


19 1m' Memasang Pemasangan Precast U- 800 x 1000 cm
a. Terpasang
- Pasir urug 0.050 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.050 m3
b. Bahan
- U-DITCH 800x1000mm 1.100 bh
c. Tenaga
- Pekerja 0.556 oh
- Tukang batu 0.278 oh
- Kepala tukang 0.028 oh

A.6.1.1 SALURAN LUAR / HAL 460 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- Mandor 0.028 oh

19 1m' Memasang Pemasangan Precast U- 800 x 1000 cm


20 1m' Memasang Pemasangan Precast U- 1000 x 1000 cm
a. Terpasang
- Pasir urug 0.060 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.060 m3
b. Bahan
- U-DITCH 1000x1000mm 1.100 bh
c. Tenaga
- Pekerja 0.612 oh
- Tukang batu 0.306 oh
- Kepala tukang 0.031 oh
- Mandor 0.031 oh

20 1m' Memasang Pemasangan Precast U- 1000 x 1000 cm

A.6.1.1 SALURAN LUAR / HAL 461 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

21 1m' Memasang Pemasangan Precast U- 1200 x 1200 cm


a. Terpasang
- Pasir urug 0.070 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.070 m3
b. Bahan
- U-DITCH 1200x1200mm 1.100 bh
c. Tenaga
- Pekerja 0.673 oh
- Tukang batu 0.337 oh
- Kepala tukang 0.034 oh
- Mandor 0.034 oh

21 1m' Memasang Pemasangan Precast U- 1200 x 1200 cm


22 1m' Memasang tutup saluran untuk U-300
a. Terpasang
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.04 m3
- Pembesian 5.03 kg
- Bekisting pelat 0.50 m2

22 1m' Memasang tutup saluran untuk U-300


23 1m' Memasang tutup saluran untuk U-400
a. Terpasang
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.05 m3
- Pembesian 5.92 kg
- Bekisting pelat 0.60 m2

23 1m' Memasang tutup saluran untuk U-400


24 1m' Memasang tutup saluran untuk U-500
a. Terpasang
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.06 m3
- Pembesian 6.80 kg
- Bekisting pelat 0.70 m2

24 1m' Memasang tutup saluran untuk U-500


25 1m' Memasang tutup saluran untuk U-600
a. Terpasang
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.08 m3
- Pembesian 12.99 kg
- Bekisting pelat 0.80 m2

25 1m' Memasang tutup saluran untuk U-600


26 1m' Memasang tutup saluran untuk U-700
a. Terpasang
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.09 m3
A.6.1.1 SALURAN LUAR / HAL 462 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- Pembesian 14.48 kg
- Bekisting pelat 0.70 m2

26 1m' Memasang tutup saluran untuk U-700


27 1m' Memasang tutup saluran untuk U-800
a. Terpasang
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.10 m3
- Pembesian 15.98 kg
- Bekisting pelat 1.00 m2

27 1m' Memasang tutup saluran untuk U-800

A.6.1.1 SALURAN LUAR / HAL 463 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

28 1m' Memasang tutup saluran untuk U-1000


a. Terpasang
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.18 m3
- Pembesian 18.96 kg
- Bekisting pelat 1.20 m2

28 1m' Memasang tutup saluran untuk U-1000


29 1m' Memasang tutup saluran untuk U-1200
a. Terpasang
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.21 m3
- Pembesian 21.95 kg
- Bekisting pelat 1.40 m2

29 1m' Memasang tutup saluran untuk U-1200


30 1bh Memasang bak kontrol pas. Bata ukuran (30x30) cm t 35 cm
a. Bahan
- Batu bata 0.145 m3
- Semen portland 0.880 zak
- Pasir pasang 0.070 m3
- Batu kerikil 1x2cm 0.070 m3
- Besi beton 1.600 kg
- Pasir beton 0.060 m3
b. Tenaga
- Pekerja 0.380 oh
- Tukang 0.190 oh
- Kepala tukang 0.019 oh
- Mandor 0.019 oh

30 1bh Memasang bak kontrol pas. Bata ukuran (30x30) cm t 35 cm

31 1bh Memasang bak kontrol pas. Bata ukuran (50x50) cm T. 50 cm


a. Bahan
- Batu bata 0.250 m3
- Semen portland 1.540 zak
- Pasir pasang 0.130 m3
- Batu kerikil 1x2cm 0.020 m3
- Besi beton 2.600 kg
- Pasir beton 0.090 m3
b. Tenaga
- Pekerja 1.420 oh
- Tukang ledeng 0.473 oh
- Kepala tukang 0.047 oh
- Mandor 0.071 oh

31 1bh Memasang bak kontrol pas. Bata ukuran (50x50) cm T. 50 cm


32 1bh Memasang bak kontrol pas. Bata ukuran (60x60) cm T. 65 cm
a. Bahan
- Batu bata 0.371 m3
A.6.1.1 SALURAN LUAR / HAL 464 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- Semen portland 2.280 zak


- Pasir pasang 0.184 m3
- Batu kerikil 1x2cm 0.033 m3
- Besi beton 4.850 kg
- Pasir beton 0.120 m3
b. Tenaga
- Pekerja 2.160 oh
- Tukang ledeng 0.720 oh
- Kepala tukang 0.072 oh
- Mandor 0.108 oh

32 1bh Memasang bak kontrol pas. Bata ukuran (60x60) cm T. 65 cm

A.6.1.1 SALURAN LUAR / HAL 465 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

33 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 50x50x100cm termasuk tutup
a. Terpasang
- Galian Tanah 0.70 m3
- Pasir urug t=5cm 0.32 m3
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.32 m3
- Pembesian 150kg/m3 50.70 kg
- Bekisting dinding bagian luar 2 x pakai 3.52 m2
- Bekisting dinding dan tutup 2 x pakai 3.38 m2
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.34 m3
- Urugan kembali bekas galian 0.25 m3
- Buangan tanah kearea site 0.46 m3

33 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 50x50x100cm termasuk tutup
34 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 60x60x100cm termasuk tutup
a. Terpasang
- Galian Tanah 0.89 m3
- Pasir urug t=5cm 0.41 m3
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.41 m3
- Pembesian 150kg/m3 61.20 kg
- Bekisting dinding bagian luar 2 x pakai 3.96 m2
- Bekisting dinding dan tutup 2 x pakai 4.08 m2
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.41 m3
- Urugan kembali bekas galian 0.31 m3
- Buangan tanah kearea site 0.58 m3

34 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 60x60x100cm termasuk tutup
35 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 70x70x120cm termasuk tutup
a. Terpasang
- Galian Tanah 1.57 m3
- Pasir urug t=5cm 0.59 m3
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.59 m3
- Pembesian 150kg/m3 96.30 kg
- Bekisting dinding bagian luar 2 x pakai 5.20 m2
- Bekisting dinding dan tutup 2 x pakai 5.35 m2
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.64 m3
- Urugan kembali bekas galian 0.55 m3
- Buangan tanah kearea site 1.02 m3

35 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 70x70x120cm termasuk tutup
36 1bh Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 80x80x130cm termasuk tutup
a. Terpasang
- Galian Tanah 2.02 m3
- Pasir urug t=5cm 0.59 m3
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.59 m3
- Pembesian 150kg/m3 102.97 kg
- Bekisting dinding bagian luar 2 x pakai 6.27 m2
A.6.1.1 SALURAN LUAR / HAL 466 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- Bekisting dinding dan tutup 2 x pakai 5.72 m2


- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.69 m3
- Urugan kembali bekas galian 0.71 m3
- Buangan tanah kearea site 1.31 m3

36 1bh Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 80x80x130cm termasuk tutup
37 1bh Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 90x90x150cm termasuk tutup
a. Terpasang
- Galian Tanah 3.33 m3
- Pasir urug t=5cm 0.65 m3
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.65 m3
- Pembesian 150kg/m3 156.95 kg
- Bekisting dinding bagian luar 2 x pakai 7.68 m2
- Bekisting dinding dan tutup 2 x pakai 8.72 m2
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 1.05 m3
- Urugan kembali bekas galian 1.17 m3
- Buangan tanah kearea site 2.17 m3

37 1bh Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 90x90x150cm termasuk tutup

A.6.1.1 SALURAN LUAR / HAL 467 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

38 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 100x100x200cm termasuk tutup
a. Terpasang
- Galian Tanah 4.95 m3
- Pasir urug t=5cm 0.85 m3
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.85 m3
- Pembesian 150kg/m3 283.05 kg
- Bekisting dinding bagian luar 2 x pakai 11.76 m2
- Bekisting dinding dan tutup 2 x pakai 15.73 m2
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 1.89 m3
- Urugan kembali bekas galian 1.73 m3
- Buangan tanah kearea site 3.22 m3

38 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 100x100x200cm termasuk tutup
39 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 120x120x200cm termasuk tutup
a. Terpasang
- Galian Tanah 6.36 m3
- Pasir urug t=5cm 1.04 m3
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 1.04 m3
- Pembesian 150kg/m3 344.25 kg
- Bekisting dinding bagian luar 2 x pakai 13.44 m2
- Bekisting dinding dan tutup 2 x pakai 15.30 m2
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 2.30 m3
- Urugan kembali bekas galian 2.23 m3
- Buangan tanah kearea site 4.13 m3

39 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 120x120x200cm termasuk tutup
40 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 140x140x200cm termasuk tutup
a. Terpasang
- Galian Tanah 7.94 m3
- Pasir urug t=5cm 1.45 m3
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 1.45 m3
- Pembesian 150kg/m3 409.05 kg
- Bekisting dinding bagian luar 2 x pakai 16.72 m2
- Bekisting dinding dan tutup 2 x pakai 18.18 m2
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 2.73 m3
- Urugan kembali bekas galian 2.78 m3
- Buangan tanah kearea site 5.16 m3

40 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 140x140x200cm termasuk tutup
41 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 200x200x300cm termasuk tutup
a. Terpasang
- Galian Tanah 20.00 m3
- Pasir urug t=5cm 0.26 m3
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.26 m3
- Pembesian 150kg/m3 818.55 kg
A.6.1.1 SALURAN LUAR / HAL 468 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

- Bekisting dinding bagian luar 2 x pakai 32.00 m2


- Bekisting dinding dan tutup 2 x pakai 36.38 m2
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 5.46 m3
- Urugan kembali bekas galian 7.00 m3
- Buangan tanah kearea site 13.00 m3

41 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 200x200x300cm termasuk tutup

A.6.1.1 SALURAN LUAR / HAL 469 DARI 616


ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

42 1bh Pembuatan sumur bidang resapan Ø100 kedalaman 2.50m


a. Terpasang
- Galian Tanah sumuran 1.570 m3
- Pasir urug t=5cm 0.039 m3
- Buis beton Ø 100 cm ( Pipa tipe CL Dusaspun (Class 2 ) Panjang
2,45m terpasang 1.000 bh
- Pembesian 200kg/m3 ( tutup beton ) 33.912 kg
- Bekisting 1.130 kg
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.170 m3
- Adukan 1 PC : 3 PS tebal 30 mm 0.785 m2
- Kerikil sungai tak tersaring terpasang 1.963 m3
- Lapisan ijuk terpasang 50.000 kg
- Urugan kembali bekas galian 0.550 m3
- Buangan tanah kearea site 1.021 m3
- Alat bantu 1.000 ls

42 1bh Pembuatan sumur bidang resapan Ø100 kedalaman 2.50m


43 1m' Memasang Pemasangan Precast box culvert 40 x 40 x 100 cm
a. Terpasang
- Pasir urug 0.030 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.030 m3
b. Bahan
- Box Culvert 400x400x1000x80mm 1.100 bh
c. Tenaga
- Pekerja 0.418 oh
- Tukang batu 0.209 oh
- Kepala tukang 0.021 oh
- Mandor 0.021 oh

43 1m' Memasang Pemasangan Precast box culvert 40 x 40 x 100 cm


44 1m' Memasang Pemasangan Precast box culvert 60 x 60 x 100 cm
a. Terpasang
- Pasir urug 0.040 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.040 m3
b. Bahan
- Box Culvert 600x600x1000x110mm 1.100 bh
c. Tenaga
- Pekerja 0.506 oh
- Tukang batu 0.253 oh
- Kepala tukang 0.025 oh
- Mandor 0.025 oh

44 1m' Memasang Pemasangan Precast box culvert 60 x 60 x 100 cm

43 1m' Memasang Pemasangan Precast box culvert 20 x 30 x 100 cm


a. Terpasang
- Pasir urug 0.020 m3
Membuat 1 m³ beton mutu K125, (slump 120 + 20) mm 0.020 m3
A.6.1.1 SALURAN LUAR / HAL 470 DARI 616
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN

1 2 3 4

b. Bahan
- Box Culvert 20x30x100 1.100 bh
c. Tenaga
- Pekerja 0.418 oh
- Tukang batu 0.209 oh
- Kepala tukang 0.021 oh
- Mandor 0.021 oh

43 1m' Memasang Pemasangan Precast box culvert 20 x 30 x 100 cm

A.6.1.1 SALURAN LUAR / HAL 471 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Rp. 31,836.27
17,075.30 27,320.48
66,110.00 899.10
175,450.00 2,280.85
121,440.00 1,335.84
Rp. 10,350.73
89,320.00 5,359.20
137,445.00 4,123.35
157,850.00 473.55
157,850.00 394.63
Jumlah Rp 42,186.99
Overhead & keuntungan 10% : Rp 4,218.70
Jumlah : Rp 46,405.69
Dibulatkan : Rp 46,400.00

Rp. 46,714.29
25,879.70 41,407.52
66,110.00 1,150.31
175,450.00 2,456.30
121,440.00 1,700.16
Rp. 14,379.75
89,320.00 7,145.60
137,445.00 5,497.80
157,850.00 631.40
157,850.00 1,104.95
Jumlah Rp 61,094.04
Overhead & keuntungan 10% : Rp 6,109.40
Jumlah : Rp 67,203.45
Dibulatkan : Rp 67,200.00

Rp. 72,582.77
61,160.00 67,276.00
66,110.00 1,150.31
175,450.00 2,456.30
121,440.00 1,700.16
Rp. 14,379.75
89,320.00 7,145.60
137,445.00 5,497.80
157,850.00 631.40
157,850.00 1,104.95
Jumlah Rp 86,962.52
Overhead & keuntungan 10% : Rp 8,696.25
Jumlah : Rp 95,658.78
Dibulatkan : Rp 95,600.00

Rp. 101,651.26
83,380.00 91,718.00
66,110.00 5,183.02
175,450.00 2,807.20
121,440.00 1,943.04
Rp. 14,379.75
89,320.00 7,145.60
137,445.00 5,497.80
157,850.00 631.40
157,850.00 1,104.95
A.6.1.1 SALURAN LUAR / HAL 472 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Jumlah Rp 116,031.01
Overhead & keuntungan 10% : Rp 11,603.10
Jumlah : Rp 127,634.12
Dibulatkan : Rp 127,600.00

Rp. 192,189.51
158,400.00 174,240.00
990.00 26.73
66,110.00 5,183.02
175,450.00 9,825.20
121,440.00 2,914.56
Rp. 24,335.85
89,320.00 12,504.80
137,445.00 9,621.15
157,850.00 1,104.95
157,850.00 1,104.95
Jumlah Rp 216,525.36
Overhead & keuntungan 10% : Rp 21,652.54
Jumlah : Rp 238,177.90
Dibulatkan : Rp 238,100.00

A.6.1.1 SALURAN LUAR / HAL 473 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Rp. 265,294.27
216,700.00 238,370.00
990.00 40.10
66,110.00 7,774.54
175,450.00 14,737.80
121,440.00 4,371.84
Rp. 36,503.78
89,320.00 18,757.20
137,445.00 14,431.73
157,850.00 1,657.43
157,850.00 1,657.43
Jumlah Rp 301,798.05
Overhead & keuntungan 10% : Rp 30,179.80
Jumlah : Rp 331,977.85
Dibulatkan : Rp 331,900.00

Rp. 341,676.41
273,900.00 301,290.00
990.00 60.14
66,110.00 11,661.80
175,450.00 22,106.70
121,440.00 6,557.76
Rp. 54,755.66
89,320.00 28,135.80
137,445.00 21,647.59
157,850.00 2,486.14
157,850.00 2,486.14
Jumlah Rp 396,432.07
Overhead & keuntungan 10% : Rp 39,643.21
Jumlah : Rp 436,075.28
Dibulatkan : Rp 436,000.00

Rp. 392,244.24
301,513.30 331,664.63
990.00 90.21
66,110.00 17,492.71
175,450.00 33,160.05
121,440.00 9,836.64
Rp. 82,133.49
89,320.00 42,203.70
137,445.00 32,471.38
157,850.00 3,729.21
157,850.00 3,729.21
Jumlah Rp 474,377.73
Overhead & keuntungan 10% : Rp 47,437.77
Jumlah : Rp 521,815.51
Dibulatkan : Rp 521,800.00

Rp. 501,035.53
389,400.00 428,340.00
990.00 108.26
66,110.00 20,991.25
175,450.00 39,792.06
121,440.00 11,803.97
Rp. 98,560.19

A.6.1.1 SALURAN LUAR / HAL 474 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

89,320.00 50,644.44
137,445.00 38,965.66
157,850.00 4,475.05
157,850.00 4,475.05
Jumlah Rp 599,595.72
Overhead & keuntungan 10% : Rp 59,959.57
Jumlah : Rp 659,555.30
Dibulatkan : Rp 659,500.00

Rp. 584,541.45
454,300.00 499,730.00
990.00 126.30
66,110.00 24,489.79
175,450.00 46,424.07
121,440.00 13,771.30
Rp. 114,986.89
89,320.00 59,085.18
137,445.00 45,459.93
157,850.00 5,220.89
157,850.00 5,220.89
Jumlah Rp 699,528.34
Overhead & keuntungan 10% : Rp 69,952.83
Jumlah : Rp 769,481.18
Dibulatkan : Rp 769,400.00

A.6.1.1 SALURAN LUAR / HAL 475 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Rp. 652,317.38
504,900.00 555,390.00
990.00 144.34
66,110.00 27,988.33
175,450.00 53,056.08
121,440.00 15,738.62
Rp. 131,413.59
89,320.00 67,525.92
137,445.00 51,954.21
157,850.00 5,966.73
157,850.00 5,966.73
Jumlah Rp 783,730.97
Overhead & keuntungan 10% : Rp 78,373.10
Jumlah : Rp 862,104.06
Dibulatkan : Rp 862,100.00

Rp. 802,389.22
619,300.00 681,230.00
990.00 180.43
66,110.00 34,985.41
175,450.00 66,320.10
121,440.00 19,673.28
Rp. 164,266.99
89,320.00 84,407.40
137,445.00 64,942.76
157,850.00 7,458.41
157,850.00 7,458.41
Jumlah Rp 966,656.21
Overhead & keuntungan 10% : Rp 96,665.62
Jumlah : Rp 1,063,321.83
Dibulatkan : Rp 1,063,300.00

Rp. 22,030.93
174,102.50 3,482.05
927,444.00 18,548.88
Rp. 170,954.45
155,413.13 170,954.45
Rp. 66,054.45
89,320.00 33,941.60
137,445.00 26,114.55
157,850.00 2,999.15
157,850.00 2,999.15
Jumlah Rp 259,039.83
Overhead & keuntungan 10% : Rp 25,903.98
Jumlah : Rp 284,943.81
Dibulatkan : Rp 284,900.00

Rp. 27,071.43
155,413.13 3,885.33
927,444.00 23,186.10
Rp. 256,431.67
233,119.70 256,431.67
Rp. 66,054.45
89,320.00 33,941.60
137,445.00 26,114.55
A.6.1.1 SALURAN LUAR / HAL 476 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

157,850.00 2,999.15
157,850.00 2,999.15
Jumlah Rp 349,557.55
Overhead & keuntungan 10% : Rp 34,955.75
Jumlah : Rp 384,513.30
Dibulatkan : Rp 384,500.00

Rp. 32,485.71
155,413.13 4,662.39
927,444.00 27,823.32
Rp. 406,109.88
369,190.80 406,109.88
Rp. 72,659.90
89,320.00 37,335.76
137,445.00 28,726.01
157,850.00 3,299.07
157,850.00 3,299.07
Jumlah Rp 511,255.49
Overhead & keuntungan 10% : Rp 51,125.55
Jumlah : Rp 562,381.04
Dibulatkan : Rp 562,300.00

A.6.1.1 SALURAN LUAR / HAL 477 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Rp. 37,900.00
155,413.13 5,439.46
927,444.00 32,460.54
Rp. 501,859.60
456,236.00 501,859.60
Rp. 79,925.88
89,320.00 41,069.34
137,445.00 31,598.61
157,850.00 3,628.97
157,850.00 3,628.97
Jumlah Rp 619,685.48
Overhead & keuntungan 10% : Rp 61,968.55
Jumlah : Rp 681,654.03
Dibulatkan : Rp 681,600.00

Rp. 43,314.29
155,413.13 6,216.53
927,444.00 37,097.76
Rp. 657,039.68
597,308.80 657,039.68
Rp. 87,918.47
89,320.00 45,176.27
137,445.00 34,758.47
157,850.00 3,991.87
157,850.00 3,991.87
Jumlah Rp 788,272.44
Overhead & keuntungan 10% : Rp 78,827.24
Jumlah : Rp 867,099.68
Dibulatkan : Rp 867,000.00

Rp. 48,728.57
155,413.13 6,993.59
927,444.00 41,734.98
Rp. 766,546.29
696,860.27 766,546.29
Rp. 96,710.32
89,320.00 49,693.90
137,445.00 38,234.31
157,850.00 4,391.06
157,850.00 4,391.06
Jumlah Rp 911,985.18
Overhead & keuntungan 10% : Rp 91,198.52
Jumlah : Rp 1,003,183.70
Dibulatkan : Rp 1,003,100.00

Rp. 54,142.86
155,413.13 7,770.66
927,444.00 46,372.20
Rp. 1,092,865.95
993,514.50 1,092,865.95
Rp. 96,710.32
89,320.00 49,693.90
137,445.00 38,234.31
157,850.00 4,391.06

A.6.1.1 SALURAN LUAR / HAL 478 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

157,850.00 4,391.06
Jumlah Rp 1,243,719.13
Overhead & keuntungan 10% : Rp 124,371.91
Jumlah : Rp 1,368,091.04
Dibulatkan : Rp 1,368,000.00

Rp. 64,971.43
155,413.13 9,324.79
927,444.00 55,646.64
Rp. 1,485,768.68
1,350,698.80 1,485,768.68
Rp. 106,381.35
89,320.00 54,663.29
137,445.00 42,057.74
157,850.00 4,830.16
157,850.00 4,830.16
Jumlah Rp 1,657,121.46
Overhead & keuntungan 10% : Rp 165,712.15
Jumlah : Rp 1,822,833.61
Dibulatkan : Rp 1,822,800.00

A.6.1.1 SALURAN LUAR / HAL 479 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Rp. 75,800.00
155,413.13 10,878.92
927,444.00 64,921.08
Rp. 1,755,909.65
1,596,281.50 1,755,909.65
Rp. 117,019.49
89,320.00 60,129.61
137,445.00 46,263.52
157,850.00 5,313.18
157,850.00 5,313.18
Jumlah Rp 1,948,729.14
Overhead & keuntungan 10% : Rp 194,872.91
Jumlah : Rp 2,143,602.05
Dibulatkan : Rp 2,143,600.00

997,886.71 39,915.47
14,167.34 71,329.02
438,400.60 219,200.30
Jumlah Rp 330,444.78
Overhead & keuntungan 10% : Rp 33,044.48
Jumlah : Rp 363,489.26
Dibulatkan : Rp 363,400.00

997,886.71 47,898.56
14,167.34 83,847.99
438,400.60 263,040.36
Jumlah Rp 394,786.91
Overhead & keuntungan 10% : Rp 39,478.69
Jumlah : Rp 434,265.60
Dibulatkan : Rp 434,200.00

997,886.71 55,881.66
14,167.34 96,366.96
438,400.60 306,880.42
Jumlah Rp 459,129.03
Overhead & keuntungan 10% : Rp 45,912.90
Jumlah : Rp 505,041.93
Dibulatkan : Rp 505,000.00

997,886.71 79,830.94
14,167.34 184,017.21
438,400.60 350,720.48
Jumlah Rp 614,568.63
Overhead & keuntungan 10% : Rp 61,456.86
Jumlah : Rp 676,025.49
Dibulatkan : Rp 676,000.00

997,886.71 89,809.80

A.6.1.1 SALURAN LUAR / HAL 480 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

14,167.34 205,174.27
438,400.60 306,880.42
Jumlah Rp 601,864.50
Overhead & keuntungan 10% : Rp 60,186.45
Jumlah : Rp 662,050.95
Dibulatkan : Rp 662,000.00

997,886.71 99,788.67
14,167.34 226,331.33
438,400.60 438,400.60
Jumlah Rp 764,520.60
Overhead & keuntungan 10% : Rp 76,452.06
Jumlah : Rp 840,972.66
Dibulatkan : Rp 840,900.00

A.6.1.1 SALURAN LUAR / HAL 481 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

997,886.71 179,619.61
14,167.34 268,645.45
438,400.60 526,080.72
Jumlah Rp 974,345.78
Overhead & keuntungan 10% : Rp 97,434.58
Jumlah : Rp 1,071,780.36
Dibulatkan : Rp 1,071,700.00

997,886.71 209,556.21
14,167.34 310,959.57
438,400.60 613,760.84
Jumlah Rp 1,134,276.62
Overhead & keuntungan 10% : Rp 113,427.66
Jumlah : Rp 1,247,704.28
Dibulatkan : Rp 1,247,700.00

246,824.60
891,000.00 129,195.00
66,110.00 58,176.80
175,450.00 12,281.50
259,490.00 18,164.30
11,550.00 18,480.00
175,450.00 10,527.00
66,054.45
89,320.00 33,941.60
137,445.00 26,114.55
157,850.00 2,999.15
157,850.00 2,999.15
Jumlah Rp 312,879.05
Overhead & keuntungan 10% : Rp 31,287.91
Jumlah : Rp 344,166.96
Dibulatkan : Rp 344,100.00

398,378.20
891,000.00 222,750.00
66,110.00 101,809.40
175,450.00 22,808.50
259,490.00 5,189.80
11,550.00 30,030.00
175,450.00 15,790.50
210,472.19
89,320.00 126,834.40
137,445.00 65,011.49
157,850.00 7,418.95
157,850.00 11,207.35
Jumlah Rp 608,850.39
Overhead & keuntungan 10% : Rp 60,885.04
Jumlah : Rp 669,735.42
Dibulatkan : Rp 669,700.00

599,209.27
891,000.00 330,561.00
A.6.1.1 SALURAN LUAR / HAL 482 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

66,110.00 150,730.80
175,450.00 32,282.80
259,490.00 8,563.17
11,550.00 56,017.50
175,450.00 21,054.00
320,304.60
89,320.00 192,931.20
137,445.00 98,960.40
157,850.00 11,365.20
157,850.00 17,047.80
Jumlah Rp 919,513.87
Overhead & keuntungan 10% : Rp 91,951.39
Jumlah : Rp 1,011,465.26
Dibulatkan : Rp 1,011,400.00

A.6.1.1 SALURAN LUAR / HAL 483 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

mm uk. 50x50x100cm termasuk tutup

70,936.25 49,939.12
174,102.50 55,712.80
927,444.00 296,782.08
14,167.340 718,284.14
370,166.450 1,302,985.90
370,166.450 1,251,162.60
997,886.71 337,285.71
60,935.88 15,014.60
31,054.10 14,210.36
Jumlah Rp 4,041,377.31
Overhead & keuntungan 10% : Rp 404,137.73
Jumlah : Rp 4,445,515.04
0mm uk. 50x50x100cm termasuk tutup Dibulatkan : Rp 4,445,500.00
mm uk. 60x60x100cm termasuk tutup

70,936.25 63,204.20
174,102.50 70,511.51
927,444.00 375,614.82
14,167.340 867,041.21
370,166.450 1,465,859.14
370,166.450 1,510,279.12
997,886.71 407,137.78
60,935.88 19,002.85
31,054.10 17,984.98
Jumlah Rp 4,796,635.61
Overhead & keuntungan 10% : Rp 479,663.56
Jumlah : Rp 5,276,299.17
0mm uk. 60x60x100cm termasuk tutup Dibulatkan : Rp 5,276,200.00
mm uk. 70x70x120cm termasuk tutup

70,936.25 111,582.72
174,102.50 103,425.59
927,444.00 550,948.11
14,167.340 1,364,314.84
370,166.450 1,924,865.54
370,166.450 1,980,390.51
997,886.71 640,643.27
60,935.88 33,548.25
31,054.10 31,751.26
Jumlah Rp 6,741,470.09
Overhead & keuntungan 10% : Rp 674,147.01
Jumlah : Rp 7,415,617.09
0mm uk. 70x70x120cm termasuk tutup Dibulatkan : Rp 7,415,600.00
mm uk. 80x80x130cm termasuk tutup

70,936.25 143,007.48
174,102.50 103,425.59
927,444.00 550,948.11
14,167.340 1,458,839.33
370,166.450 2,321,683.97
A.6.1.1 SALURAN LUAR / HAL 484 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

370,166.450 2,117,598.87
997,886.71 685,029.27
60,935.88 42,996.35
31,054.10 40,693.29
Jumlah Rp 7,464,222.27
Overhead & keuntungan 10% : Rp 746,422.23
Jumlah : Rp 8,210,644.50
0mm uk. 80x80x130cm termasuk tutup Dibulatkan : Rp 8,210,600.00
mm uk. 90x90x150cm termasuk tutup

70,936.25 236,359.59
174,102.50 113,131.80
927,444.00 602,653.11
14,167.340 2,223,501.68
370,166.450 2,842,878.34
370,166.450 3,227,555.31
997,886.71 1,044,092.85
60,935.88 71,063.42
31,054.10 67,256.97
Jumlah Rp 10,428,493.06
Overhead & keuntungan 10% : Rp 1,042,849.31
Jumlah : Rp 11,471,342.37
0mm uk. 90x90x150cm termasuk tutup Dibulatkan : Rp 11,471,300.00

A.6.1.1 SALURAN LUAR / HAL 485 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

mm uk. 100x100x200cm termasuk tutup

70,936.25 351,134.44
174,102.50 147,116.61
927,444.00 783,690.18
14,167.340 4,010,065.59
370,166.450 4,353,157.45
370,166.450 5,820,867.43
997,886.71 1,883,012.22
60,935.88 105,571.40
31,054.10 99,916.57
Jumlah Rp 17,554,531.88
Overhead & keuntungan 10% : Rp 1,755,453.19
Jumlah : Rp 19,309,985.07
0mm uk. 100x100x200cm termasuk tutup Dibulatkan : Rp 19,309,900.00
mm uk. 120x120x200cm termasuk tutup

70,936.25 451,012.68
174,102.50 180,509.47
927,444.00 961,573.94
14,167.340 4,877,106.80
370,166.450 4,975,037.09
370,166.450 5,663,546.69
997,886.71 2,290,149.99
60,935.88 135,600.60
31,054.10 128,337.28
Jumlah Rp 19,662,874.53
Overhead & keuntungan 10% : Rp 1,966,287.45
Jumlah : Rp 21,629,161.98
0mm uk. 120x120x200cm termasuk tutup Dibulatkan : Rp 21,629,100.00
mm uk. 140x140x200cm termasuk tutup

70,936.25 563,375.70
174,102.50 251,578.11
927,444.00 1,340,156.58
14,167.340 5,795,150.43
370,166.450 6,189,183.04
370,166.450 6,729,626.06
997,886.71 2,721,237.05
60,935.88 169,383.45
31,054.10 160,310.58
Jumlah Rp 23,920,001.00
Overhead & keuntungan 10% : Rp 2,392,000.10
Jumlah : Rp 26,312,001.10
0mm uk. 140x140x200cm termasuk tutup Dibulatkan : Rp 26,312,000.00
mm uk. 200x200x300cm termasuk tutup

70,936.25 1,418,725.00
174,102.50 46,050.11
927,444.00 245,308.94
14,167.340 11,596,676.16

A.6.1.1 SALURAN LUAR / HAL 486 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

370,166.450 11,845,326.40
370,166.450 13,466,655.45
997,886.71 5,445,467.76
60,935.88 426,551.13
31,054.10 403,703.30
Jumlah Rp 44,894,464.24
Overhead & keuntungan 10% : Rp 4,489,446.42
Jumlah : Rp 49,383,910.67
0mm uk. 200x200x300cm termasuk tutup Dibulatkan : Rp 49,383,900.00

A.6.1.1 SALURAN LUAR / HAL 487 DARI 616


H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

108,670.10 170,612.06
174,102.50 6,833.52

3,748,375.00 3,748,375.00
14,167.340 480,442.83
370,166.450 418,436.16
997,886.71 169,201.67
128,058.05 100,525.57
289,850.00 568,830.63
57,500.00 2,875,000.00
38,034.54 20,899.98
31,054.10 31,690.71
1,311,931.25 1,311,931.25
Jumlah Rp 9,902,779.37
Overhead & keuntungan 10% : Rp 990,277.94
Jumlah : Rp 10,893,057.31
Dibulatkan : Rp 10,893,000.00

Rp. 32,485.71
155,413.13 4,662.39
927,444.00 27,823.32
Rp. 936,100.00
851,000.00 936,100.00
Rp. 72,659.90
89,320.00 37,335.76
137,445.00 28,726.01
157,850.00 3,299.07
157,850.00 3,299.07
Jumlah Rp 1,041,245.61
Overhead & keuntungan 10% : Rp 104,124.56
Jumlah : Rp 1,145,370.17
Dibulatkan : Rp 1,145,300.00

Rp. 43,314.29
155,413.13 6,216.53
927,444.00 37,097.76
Rp. 1,533,400.00
1,394,000.00 1,533,400.00
Rp. 87,918.47
89,320.00 45,176.27
137,445.00 34,758.47
157,850.00 3,991.87
157,850.00 3,991.87
Jumlah Rp 1,664,632.76
Overhead & keuntungan 10% : Rp 166,463.28
Jumlah : Rp 1,831,096.03
Dibulatkan : Rp 1,831,000.00

Rp. 21,657.14
155,413.13 3,108.26
927,444.00 18,548.88
A.6.1.1 SALURAN LUAR / HAL 488 DARI 616
H. SATUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

Rp. 617,705.00
561,550.00 617,705.00
Rp. 72,659.90
89,320.00 37,335.76
137,445.00 28,726.01
157,850.00 3,299.07
157,850.00 3,299.07
Jumlah Rp 712,022.04
Overhead & keuntungan 10% : Rp 71,202.20
Jumlah : Rp 783,224.24
Dibulatkan : Rp 783,200.00

A.6.1.1 SALURAN LUAR / HAL 489 DARI 616


Analisa EI-611a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (1a)


JENIS PEKERJAAN : Lapis Resap Pengikat
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 7,142.86 14.88


2. Mandor (L03) Jam 0.0004 10,000.00 4.17

JUMLAH HARGA TENAGA 19.05

B. BAHAN

1. Aspal M10 Kg 0.7581 9,500.00 7,201.76


2. Kerosene M11 liter 0.4140 9,900.00 4,098.60

JUMLAH HARGA BAHAN 11,300.36

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 164,819.11 34.34


2. Compressor E05 Jam 0.0002 95,290.42 19.85

JUMLAH HARGA PERALATAN 54.19

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 11,373.60


E. OVERHEAD & PROFIT 10.0 % x D 1,137.36
F. HARGA SATUAN PEKERJAAN ( D + E ) 12,510.96
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.490 dari 616
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (2a)


JENIS PEKERJAAN : Lapis Perekat
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 0.00


2. Mandor (L03) Jam 0.0004 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Aspal M10 Kg 0.9476 0.00


2. Kerosene M11 liter 0.2300 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 0.00


2. Compressor E05 Jam 0.0002 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.491 dari 616
Analisa EI-621a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.2 (1a)


JENIS PEKERJAAN : Agregat Penutup BURTU
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2126 0.00


2. Mandor (L03) Jam 0.0106 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Chipping M41 Kg 23.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Wheel Loader E15 Jam 0.0106 0.00


2. Dump Truck E08 Jam 0.0394 0.00
3. P. Tyre Roller E18 Jam 0.0005 0.00
4. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.492 dari 616
Analisa EI-622a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.2 (2a)


JENIS PEKERJAAN : Agregat Penutup BURDA
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.3544 0.00


2. Mandor (L03) Jam 0.0177 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Chipping M41 Kg 35.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Wheel Loader E15 Jam 0.0177 0.00


2. Dump Truck E08 Jam 0.0622 0.00
3. P. Tyre Roller E18 Jam 0.0011 0.00
4. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.493 dari 616
Analisa EI-633 (b1)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (3b)1


JENIS PEKERJAAN : Lataston Lapis Aus (HRS-WC) Levelling
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1401 0.00


2. Mandor (L03) Jam 0.0200 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. HRS M104 Ton 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E08 Jam 0.8166 0.00


2. Asphalt Finisher E02 Jam 0.0200 0.00
3. Tandem Roller E17 Jam 0.0157 0.00
4. P. Tyre Roller E18 Jam 0.0063 0.00
5. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.494 dari 616
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.495 dari 616


Analisa EI-634 (b1)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (4b)1


JENIS PEKERJAAN : Lataston Lapis Pondasi (HRS-Base) Levelling
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1201 0.00


2. Mandor (L03) Jam 0.0172 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. HRS M104 Ton 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E08 Jam 0.8166 0.00


2. Asphalt Finisher E02 Jam 0.0172 0.00
3. Tandem Roller E17 Jam 0.0161 0.00
4. P. Tyre Roller E18 Jam 0.0072 0.00
5. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.496 dari 616
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.497 dari 616


Analisa EI-635(b)1

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (5b)1


JENIS PEKERJAAN : Laston Lapis Aus (AC-WC) Levelling
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 0.00


2. Mandor (L03) Jam 0.0201 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. AC-WC M105 Ton 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E08 Jam 0.8166 0.00


2. Asp. Finisher E02 Jam 0.0144 0.00
3. Tandem Roller E17 Jam 0.0135 0.00
4. P. Tyre Roller E18 Jam 0.0061 0.00
5. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.498 dari 616
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.499 dari 616


Analisa EI-636(b1)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (6b)1


JENIS PEKERJAAN : Laston Lapis Antara (AC-BC) Levelling
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 0.00


2. Mandor (L03) Jam 0.0201 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. AC-BC M106 Ton 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1 Dump Truck E08 Jam 0.8166 0.00


2 Asphalt Finisher E02 Jam 0.0096 0.00
3 Tandem Roller E17 Jam 0.0090 0.00
4 P. Tyre Roller E18 Jam 0.0040 0.00
5 Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

als bm jalan/hal.500 dari 616


ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.501 dari 616


Analisa EI-637(b1)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (7b)1


JENIS PEKERJAAN : Laston Lapis Fondasi Perata (AC-Base L)
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 0.00


2. Mandor (L03) Jam 0.0201 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1 AC-Base M107 Ton 1.0000 0.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E08 Jam 0.8166 0.00


2. Asphalt Finisher E02 Jam 0.0082 0.00
3. Tandem Roller E17 Jam 0.0077 0.00
4. P. Tyre Roller E18 Jam 0.0035 0.00
5. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.502 dari 616
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.503 dari 616


Analisa EI-633(a1)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (3a)1


JENIS PEKERJAAN : Lataston Lapis Aus (HRS-WC)
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1401 0.00


2. Mandor (L03) Jam 0.0200 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. HRS M104 Ton 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E08 Jam 0.8166 0.00


2. Asphalt Finisher E02 Jam 0.0200 0.00
3. Tandem Roller E17 Jam 0.0157 0.00
4. P. Tyre Roller E18 Jam 0.0063 0.00
5. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.504 dari 616
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.505 dari 616


Analisa EI-634(a1)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (4a)1


JENIS PEKERJAAN : Lataston Lapis Pondasi (HRS-Base)
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1201 0.00


2. Mandor (L03) Jam 0.0172 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. HRS M104 Ton 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E08 Jam 0.8166 0.00


2. Asphalt Finisher E02 Jam 0.0172 0.00
3. Tandem Roller E17 Jam 0.0161 0.00
4. P. Tyre Roller E18 Jam 0.0072 0.00
5. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.506 dari 616
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.507 dari 616


Analisa EI-635(a)1

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (5a)1


JENIS PEKERJAAN : Laston Lapis Aus (AC-WC)
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 0.00


2. Mandor (L03) Jam 0.0201 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. AC-WC M105 Ton 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E08 Jam 0.8166 0.00


2. Asp. Finisher E02 Jam 0.0144 0.00
3. Tandem Roller E17 Jam 0.0135 0.00
4. P. Tyre Roller E18 Jam 0.0061 0.00
5. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.508 dari 616
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.509 dari 616


Analisa EI-636(a1)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (6a)1


JENIS PEKERJAAN : Laston Lapis Antara (AC-BC)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 0.00


2. Mandor (L03) Jam 0.0201 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. AC-BC M106 Ton 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1 Dump Truck E08 Jam 0.8166 0.00


2 Asphalt Finisher E02 Jam 0.0096 0.00
3 Tandem Roller E17 Jam 0.0090 0.00
4 P. Tyre Roller E18 Jam 0.0040 0.00
5 Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

als bm jalan/hal.510 dari 616


ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.511 dari 616


Analisa EI-637(a1)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (7a)1


JENIS PEKERJAAN : Laston Lapis Pondasi (AC-Base)
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 0.00


2. Mandor (L03) Jam 0.0201 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1 AC-Base M107 Ton 1.0000 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Dump Truck E08 Jam 0.8166 0.00


2. Asphalt Finisher E02 Jam 0.0082 0.00
3. Tandem Roller E17 Jam 0.0077 0.00
4. P. Tyre Roller E18 Jam 0.0035 0.00
5. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.512 dari 616
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah

als bm jalan/hal.513 dari 616


Analisa EI-661(a1)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.6 (1)a


JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam (t= 5cm)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417 0.00


2. Mandor (L03) Jam 0.0142 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Batu Pecah Mesin 3-5 cm M101 M3 1.5000 0.00


2. Batu Pecah Mesin 1 - 2 cm M92b M3 0.3621 0.00
3. Batu Pecah Mesin 0,5-1 cm M92a M3 0.2070 0.00
4. Aspal M10 Kg 107.1200 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. 3-Wheel Roller E16 Jam 0.0609 0.00


2. Asp. Sprayer E03 Jam 0.0004 0.00
3. Alat bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
als bm jalan/hal.514 dari 616
ALAT BANTU
Diperlukan setiap : 75,00 m3 pekerjaan
- Kereta dorong = 3 buah
- Sekop = 5 buah
- Sapu = 5 buah
- Pengki = 3 buah
- Karung = 5 buah
- Cerek Aspal = 3 buah
- Kaleng Aspal = 3 buah

als bm jalan/hal.515 dari 616


ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

PEKERJAAN JALAN/PERKERASAN
DIRJEN Binamarga-PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
P.01 1 Hr Pekerjaan Menggilas

Sewa mesin gilas 7.000 JAM 219,754.18


Bahan Bakar (BBM & oli) 1.000 ls 200,000.00
Operator mesin 1.000 org/hr 184,800.00
Jumlah : ..................... 3 km
Kec. per jam 21 km
Kec. 1 hr (8 jam-1jam istirahat) 21.000 x 1,2
Luas jalan u/ lebar efektif 25.200 / 40
U/ kepadatan max. lap macadam 25.200 / 20
U/ kepadatan max. amparan 1,923,079.26
>>>>>>>>>>> Biaya menggilas macadam /m² = 1,923,079.26
>>>>>>>>>>> Biaya menggilas amparan / m² =

P001a ### Pekerjaan Macadam T=20 cm


Bahan
Batu belah 0.240 m³ 261,140.00
Pasir urug 0.150 m³ 121,440.00
Biaya menggilas 1.000 m² 3,052.51
Tenaga Kerja
Pekerja 0.300 org/hr 89,320.00
Mandor 0.010 org/hr 157,850.00

Overhead & keuntu

P001a ### Pekerjaan Macadam T=20 cm


P.01b 1 m² Pekerjaan Macadam T=25 cm
Bahan
Batu belah 0.300 m³ 261,140.00
Pasir urug 0.200 m³ 121,440.00
Biaya menggilas 1.000 m² 3,052.51
Tenaga Kerja
Pekerja 0.300 org/hr 89,320.00
Mandor 0.010 org/hr 157,850.00

Overhead & keuntu

P.01b 1 m² Pekerjaan Macadam T=25 cm


P.01c 1 m² Pekerjaan Macadam T=30 cm
Bahan
Batu belah 0.360 m³ 261,140.00
Pasir urug 0.200 m³ 121,440.00
Biaya menggilas 1.000 m² 3,052.51
Tenaga Kerja
Pekerja 0.300 org/hr 89,320.00
Mandor 0.010 org/hr 157,850.00

Overhead & keuntu

P.01c 1 m² Pekerjaan Macadam T=30 cm


P.02 1 m² Pekerjaan Onderlag Telford 15/20 1 lapis
Bahan
Batu belah 15/20 0.240 m³ 292,327.17
Biaya menggilas 1.000 m² 3,052.51

6.P.Pek.Jalan / HAL 516 DARI 616


ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

Tenaga Kerja
Pekerja 0.250 org/hr 89,320.00
Mandor 0.025 org/hr 157,850.00

Overhead & keuntu

P.02 1 m² Pekerjaan Onderlag Telford 15/20 1 lapis


P.03 1 m² Pekerjaan Steenslag 5/7 1 Lapis
Bahan
Batu belah 5/7 0.060 m³ 292,327.17
Biaya menggilas 1.000 m² 1,526.25
Tenaga Kerja
Pekerja 0.125 org/hr 89,320.00
Mandor 0.013 org/hr 157,850.00

Overhead & keuntu

P.03 1 m² Pekerjaan Steenslag 5/7 1 Lapis


P.04 1 m² Pekerjaan Spleet 3/4 1 Lapis
Bahan
Batu pecah 3/5 0.030 m³ 358,244.08
Biaya menggilas 1.000 m² 1,526.25
Tenaga Kerja
Pekerja 0.125 org/hr 89,320.00
Mandor 0.013 org/hr 157,850.00

Overhead & keuntu

P.04 1 m² Pekerjaan Spleet 3/4 1 Lapis

6.P.Pek.Jalan / HAL 517 DARI 616


ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

P.05 1 m² Pekerjaan Amparan Batu Pecah 2/3 T=5 cm


Bahan
Batu Pecah 2/3 0.055 m³ 231,880.00
Biaya menggilas 1.000 m³ 1,526.25
Tenaga Kerja
Pekerja 0.200 org/hr 89,320.00
Mandor 0.010 org/hr 157,850.00

Overhead & keuntu

P.05 1 m² Pekerjaan Amparan Batu Pecah 2/3 T=5 cm


P.06 1 m² Pekerjaan Lapisan Pengisi / Penutup
Bahan
Batu Pecah 1/2 0.0100 m³ 259,490.00
Pasir Beton 0.0100 m³ 175,450.00
Tenaga Kerja
Pekerja 0.1600 org/hr 89,320.00
Mandor 0.0080 org/hr 157,850.00

Overhead & keuntu

P.06 1 m² Pekerjaan Lapisan Pengisi / Penutup


P.07 1 m² Pekerjaan Pengaspalan Manual
Bahan
Abu batu/Pasir beton 0.004 m³ 175,450.00
Aspal 4.000 kg 12,461.59
Kayu bakar 0.030 m³ 375,000.00
Tenaga Kerja
Tukang Aspal 0.080 org/hr 137,445.00
Mandor 0.004 org/hr 157,850.00
Alat bantu 1.000 ls 1,000.00

Overhead & keuntu

P.07 1 m² Pekerjaan Pengaspalan Manual


P.08 1 m³ Pekerjaan Base Course A
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
Base Coarse A 1.2586 m³ 175,848.20
Tenaga Kerja
Pekerja 0.0595 jam 17,864.00
Mandor 0.0085 jam 31,570.00
Sewa alat
Wheel Loader 0.0085 jam 467,182.34
Dump Truck 0.5043 jam 475,167.11
Motor Grader 0.0094 jam 258,500.00
Tandem roller 0.0428 jam 404,666.92
Water tank Truck 0.0141 jam 223,411.65

Overhead & keuntu

P.08 1 m³ Pekerjaan Base Course A


P.09 1 m³ Pekerjaan Sub base course kelas B
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
Base Coarse B 1.2586 m³ 145,530.00
Tenaga Kerja
6.P.Pek.Jalan / HAL 518 DARI 616
ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

Pekerja 0.0595 org/hr 17,864.00


Mandor 0.0085 org/hr 31,570.00
Sewa alat
Wheel Loader 0.0085 jam 467,182.34
Dump Truck 0.5043 jam 475,167.11
Motor Grader 0.0094 jam 258,500.00
Tandem roller 0.0428 jam 404,666.92
Water tank Truck 0.0141 jam 223,411.65

Overhead & keuntu

P.09 1 m³ Pekerjaan Sub base course kelas B

6.P.Pek.Jalan / HAL 519 DARI 616


ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

P.010 1 m³ Pekerjaan Sub base course kelas C


DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
Base Coarse C 1.2586 m³ 127,338.20
Tenaga Kerja
Pekerja 0.0595 org/hr 89,320.00
Mandor 0.0085 org/hr 157,850.00
Sewa alat
Wheel Loader 0.0085 jam 467,182.34
Dump Truck 0.5043 jam 475,167.11
Motor Grader 0.0094 jam 258,500.00
Tandem roller 0.0428 jam 404,666.92
Water tank Truck 0.0141 jam 223,411.65

Overhead & keuntu

P.010 1 m³ Pekerjaan Sub base course kelas C


P.011 1 m² Pekerjaan AC-BC / Binder Coarse tebal 13.5 cm
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
ATBL 0.2150 Ton 1,423,630.47
Tenaga Kerja
Pekerja 0.0188 org/hr 89,320.00
Mandor 0.0026 org/hr 157,850.00
Alat
Wheel Loader 0.0007 jam 467,182.34
Asphalt Mixing Plant 30 T 0.0013 jam 364,000.00
Genset 0.0013 jam 468,750.00
Asphalt Finisher 0.0033 jam 776,461.11
Tandem roller 10-12 ton 0.0033 jam 404,666.92
Pneumatic Tired Roller 0.0015 jam 274,959.30

Overhead & keuntu

P.011 1 m² Pekerjaan AC-BC / Binder Coarse tebal 13.5 cm


P.012 1 m² Pekerjaan AC-WC tebal 4 cm
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
AC-WC 0.1100 ton 1,606,305.82
Tenaga Kerja
Pekerja 0.0186 jam 89,320.00
Mandor 0.0019 jam 157,850.00
Alat
Wheel Loader 0.0009 jam 467,182.34
Asphalt Mixing Plant 30 T 0.0019 jam 364,000.00
Genset 0.0019 jam 468,750.00
Dump Truck 0.0343 jam 475,167.11
Asphalt Finisher 0.0013 jam 776,461.11
Tandem roller 10-12 ton 0.0033 jam 404,666.92
Pneumatic Tired Roller 0.0015 jam 274,959.30

Overhead & keuntu

P.012 1 m² Pekerjaan AC-WC tebal 4 cm


P.013 1 m² Pekerjaan HRS-WC tebal 3 cm
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
6.P.Pek.Jalan / HAL 520 DARI 616
ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

HRS 0.1000 ton 2,063,449.61


Tenaga Kerja
Pekerja 0.0094 org/hr 89,320.00
Mandor 0.0013 org/hr 157,850.00
Alat
Wheel Loader 0.0007 jam 467,182.34
Asphalt Mixing Plant 30 T 0.0013 jam 364,000.00
Genset 0.0013 jam 468,750.00
Asphalt Finisher 0.0033 jam 776,461.11
Tandem roller 10-12 ton 0.0033 jam 404,666.92
Pneumatic Tired Roller 0.0015 jam 274,959.30

Overhead & keuntu

P.013 1 m² Pekerjaan HRS-WC tebal 3 cm

6.P.Pek.Jalan / HAL 521 DARI 616


ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

P.014 1 m² Pekerjaan Sand Sheet 2cm


Bahan
Sand Sheet 0.0400 m3 175,450.00
Tenaga Kerja
Tenaga/Pekerja 0.0800 org/hr 89,320.00
Tukang asphalt 0.0080 org/hr 137,445.00
Mandor 0.0080 org/hr 157,850.00

Asphalt Finisher 0.0044 jam 776,461.11


Tandem roller 10-12 ton 0.0044 jam 404,666.92
Pneumatic Tired Roller 0.0044 jam 274,959.30

Overhead & keuntu

P.014 1 m² Pekerjaan Sand Sheet 2cm


P.015 1 m² Pekerjaan Lapisan Penetrasi
Bahan
Batu Pecah 1/2 0.0100 m³ 259,490.00
Pasir Beton 0.0100 m³ 175,450.00
Abu Batu 0.0040 m³ 175,450.00
Aspal 4.0000 kg 12,461.59
Kayu Bakar 0.0300 m³ 375,000.00
Tenaga Kerja
Tukang aspal 0.0800 org/hr 137,445.00
Pekerja 0.1600 org/hr 89,320.00
Mandor 0.0120 org/hr 157,850.00
Alat
Biaya Menggilas 1.0000 m² 1,526.25
Alat Bantu 1.0000 ls

Overhead & keuntu

P.015 1 m² Pekerjaan Lapisan Penetrasi


P.016 1 m² Pekerjaan Teak Coating
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
Asphalt Emulsi 0.8250 kg 32,622.70
Tenaga Kerja
Tenaga/Pekerja 0.0040 jam 17,864.00
Mandor 0.0026 jam 31,570.00
Alat
Asphalt Sprayer 0.0039 jam 71,274.88
Air Compressor 0.0039 jam 98,844.90
Truck penarik 0.0039 jam 100,866.15
Alat bantu 1.0000 ls

Overhead & keuntu

P.016 1 m² Pekerjaan Teak Coating


P.017 1 m² Pekerjaan Prime Coat
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
Asphalt Emulsi 1.2000 kg 32,622.70
Tenaga Kerja
Tenaga/Pekerja 0.0010 jam 17,864.00
Mandor 0.0006 jam 31,570.00
Tenaga Kerja
6.P.Pek.Jalan / HAL 522 DARI 616
ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

Asphalt Sprayer 0.0039 jam 71,274.88


Air Compressor 0.0039 jam 98,844.90
Truck penarik 0.0039 jam 100,866.15
Alat bantu 1.0000 ls

Overhead & keuntu

P.017 1 m² Pekerjaan Prime Coat

P.018 1 m³ Pekerjaan Lime stone CBR 7 - 8%


DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
Lime stone 1.2000 m³ 292,327.17
Tenaga Kerja
Pekerja 0.0595 jam 17,864.00
Mandor 0.0085 jam 31,570.00
Sewa alat
Wheel Loader 0.0085 jam 467,182.34
Dump Truck 0.5043 jam 475,167.11
Motor Grader 0.0094 jam 258,500.00
Tandem roller 0.0428 jam 404,666.92
Water tank Truck 0.0141 jam 223,411.65

Overhead & keuntu

P.018 1 m³ Pekerjaan Lime stone CBR 7 - 8%

6.P.Pek.Jalan / HAL 523 DARI 616


ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

P.019 1 m³ Sub base course kelas B t=15 cm batu crop ( CBR 60% )
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
Batu krop 1.20 m³ 292,327.17
Tenaga Kerja
Pekerja 0.0595 jam 17,864.00
Mandor 0.0085 jam 31,570.00
Sewa alat
Wheel Loader 0.0085 jam 467,182.34
Dump Truck 0.5043 jam 475,167.11
Motor Grader 0.0094 jam 258,500.00
Tandem roller 0.0428 jam 404,666.92
Water tank Truck 0.0141 jam 223,411.65

Overhead & keuntu

P.019 1 m³ Sub base course kelas B t=15 cm batu crop ( CBR 60% )
P.020 1 m³ Urug Sirtu Padat Untuk jalan ( CBR 75% ) t=40 cm
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
Sirtu 1.20 m³ 151,800.00
Tenaga Kerja
Pekerja 0.0595 jam 17,864.00
Mandor 0.0085 jam 31,570.00
Sewa alat
Wheel Loader 0.0085 jam 467,182.34
Dump Truck 0.5043 jam 475,167.11
Motor Grader 0.0094 jam 258,500.00
Tandem roller 0.0428 jam 404,666.92
Water tank Truck 0.0141 jam 223,411.65

Overhead & keuntu

P.020 1 m³ Urug Sirtu Padat Untuk jalan ( CBR 75% ) t=40 cm


P.021 1 m' Pekerjaan Kansteen ( 15.28.60 )
PERMEN PU 11/PRT/M/2013
Pek. Analisa sebelum keuntungan
Galian Tanah 0.088 m³ 70,936.25
Urugan pasir 0.010 m³ 174,102.50
Mengurug Kembali 0.031 m³ 23,645.42
Adukan 1:5 / screed untuk penahan 0.200 m2 60,647.73
Bahan
Beton kansteen 1.667 bh 52,514.00
Semen untuk pengikat 0.100 zak 66,110.00
Tenaga Kerja ( Upah pasanga )
Pekerja 0.2000 org/hr 89,320.00
Tukang Batu 0.1000 org/hr 137,445.00
Kepala Tukang Batu 0.0100 org/hr 157,850.00
Mandor 0.0050 org/hr 157,850.00

Overhead & keuntu

P.021 1 m' Pekerjaan Kansteen ( 15.28.60 )

6.P.Pek.Jalan / HAL 524 DARI 616


ANALISA HARGA SATUAN PEKERJAAN DIRJEN BINA MARGA
H. SATUAN
NO. URAIAN KOEF SATUAN
Rp.
1 2 3 4 5

P.09 1 m³ Pekerjaan penghamparan kerikil


DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan
Base Coarse B 1.2586 m³ 145,530.00
Tenaga Kerja
Pekerja 0.0595 jam 17,864.00
Mandor 0.0085 jam 31,570.00

Overhead & keuntu

P.09 1 m³ Pekerjaan penghamparan kerikil

6.P.Pek.Jalan / HAL 525 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

1,538,279.26
200,000.00
184,800.00
1,923,079.26
21.000 m
25.200 m²
630 m²
1.260 m²

3,052.51
1,526.25

83,942.11
62,673.60
18,216.00
3,052.51
28,374.50
26,796.00
1,578.50
Jumlah 112,316.61
Overhead & keuntungan 10% : 11,231.66
Jumlah : 123,548.27
Dibulatkan : 123,500.00

105,682.51
78,342.00
24,288.00
3,052.51
28,374.50
26,796.00
1,578.50
Jumlah 134,057.01
Overhead & keuntungan 10% : 13,405.70
Jumlah : 147,462.71
Dibulatkan : 147,400.00

121,350.91
94,010.40
24,288.00
3,052.51
28,374.50
26,796.00
1,578.50
Jumlah 149,725.41
Overhead & keuntungan 10% : 14,972.54
Jumlah : 164,697.95
Dibulatkan : 164,600.00

73,211.03
70,158.52
3,052.51

6.P.Pek.Jalan / HAL 526 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

26,276.25
22,330.00
3,946.25
Jumlah 99,487.28
Overhead & keuntungan 10% : 9,948.73
Jumlah : 109,436.01
Dibulatkan : 109,400.00

19,065.88
17,539.63
1,526.25
13,138.13
11,165.00
1,973.13
Jumlah 32,204.01
Overhead & keuntungan 10% : 3,220.40
Jumlah : 35,424.41
Dibulatkan : 35,400.00

12,273.58
10,747.32
1,526.25
13,138.13
11,165.00
1,973.13
Jumlah 25,411.70
Overhead & keuntungan 10% : 2,541.17
Jumlah : 27,952.87
Dibulatkan : 27,900.00

6.P.Pek.Jalan / HAL 527 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

14,279.65
12,753.40
1,526.25
19,442.50
17,864.00
1,578.50
Jumlah 33,722.15
Overhead & keuntungan 10% : 3,372.22
Jumlah : 37,094.37
Dibulatkan : 37,000.00

4,349.40
2,594.90
1,754.50
15,554.00
14,291.20
1,262.80
Jumlah 19,903.40
Overhead & keuntungan 10% : 1,990.34
Jumlah : 21,893.74
Dibulatkan : 21,800.00

61,798.17
701.80
49,846.37
11,250.00
12,627.00
10,995.60
631.40
1,000.00
Jumlah 74,425.17
Overhead & keuntungan 10% : 7,442.52
Jumlah : 81,867.68
Dibulatkan : 81,800.00

221,324.17
221,324.17
1,330.50
1,062.31
268.19
22,899.75
3,971.05
239,626.77
2,429.90
17,319.74
3,150.10
Jumlah 245,554.43
Overhead & keuntungan 10% : 24,555.44
Jumlah : 270,109.87
Dibulatkan : 270,100.00

183,165.41
183,165.41
1,330.50
6.P.Pek.Jalan / HAL 528 DARI 616
SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

1,062.31
268.19
246,027.72
3,971.05
239,626.77
2,429.90
17,319.74
3,150.10
Jumlah 430,523.64
Overhead & keuntungan 10% : 43,052.36
Jumlah : 473,576.00
Dibulatkan : 473,500.00

6.P.Pek.Jalan / HAL 529 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

160,269.04
160,269.04
6,652.52
5,311.55
1,340.97
246,027.72
3,971.05
239,626.77
2,429.90
17,319.74
3,150.10
Jumlah 412,949.28
Overhead & keuntungan 10% : 41,294.93
Jumlah : 454,244.21
Dibulatkan : 454,200.00

306,080.55
306,080.55
2,089.63
1,679.22
410.41
5,719.76
327.03
473.20
609.38
2,562.32
1,335.40
412.44
Jumlah 313,889.94
Overhead & keuntungan 10% : 31,388.99
Jumlah : 345,278.94
Dibulatkan : 345,200.00

176,693.64
176,693.64
1,961.27
1,661.35
299.92
20,972.58
407.47
678.30
873.49
16,306.15
989.94
1,317.70
399.53
Jumlah 199,627.49
Overhead & keuntungan 10% : 19,962.75
Jumlah : 219,590.24
Dibulatkan : 219,500.00

206,344.96
6.P.Pek.Jalan / HAL 530 DARI 616
SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

206,344.96
1,044.81
839.61
205.21
5,719.76
327.03
473.20
609.38
2,562.32
1,335.40
412.44
Jumlah 213,109.54
Overhead & keuntungan 10% : 21,310.95
Jumlah : 234,420.49
Dibulatkan : 234,400.00

6.P.Pek.Jalan / HAL 531 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

7,018.00
7,018.00
9,507.96
7,145.60
1,099.56
1,262.80
6,471.50
3,450.94
1,798.52
1,222.04
Jumlah 22,997.46
Overhead & keuntungan 10% : 2,299.75
Jumlah : 25,297.21
Dibulatkan : 25,200.00

66,147.57
2,594.90
1,754.50
701.80
49,846.37
11,250.00
27,181.00
10,995.60
14,291.20
1,894.20
1,526.25
1,526.25
-
Jumlah 94,854.82
Overhead & keuntungan 10% : 9,485.48
Jumlah : 104,340.30
Dibulatkan : 104,300.00

26,913.73
26,913.73
153.54
71.46
82.08
1,056.85
277.97
385.50
393.38
-
Jumlah 28,124.11
Overhead & keuntungan 10% : 2,812.41
Jumlah : 30,936.52
Dibulatkan : 30,900.00

39,147.24
39,147.24
36.81
17.86
18.94
1,056.85
6.P.Pek.Jalan / HAL 532 DARI 616
SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

277.97
385.50
393.38
-
Jumlah 40,240.89
Overhead & keuntungan 10% : 4,024.09
Jumlah : 44,264.98
Dibulatkan : 44,200.00

350,792.60
350,792.60
1,330.50
1,062.31
268.19
266,497.57
3,971.05
239,626.77
2,429.90
17,319.74
3,150.10
Jumlah 618,620.68
Overhead & keuntungan 10% : 61,862.07
Jumlah : 680,482.75
Dibulatkan : 680,400.00

6.P.Pek.Jalan / HAL 533 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

350,792.60
350,792.60
1,330.50
1,062.31
268.19
266,497.57
3,971.05
239,626.77
2,429.90
17,319.74
3,150.10
Jumlah 618,620.68
Overhead & keuntungan 10% : 61,862.07
Jumlah : 680,482.75
Dibulatkan : 680,400.00

182,160.00
182,160.00
1,330.50
1,062.31
268.19
266,497.57
3,971.05
239,626.77
2,429.90
17,319.74
3,150.10
Jumlah 449,988.08
Overhead & keuntungan 10% : 44,998.81
Jumlah : 494,986.88
Dibulatkan : 494,900.00

20,801.63
6,206.92
1,741.03
724.14
12,129.55
94,134.33
87,523.33
6,611.00
33,976.25
17,864.00
13,744.50
1,578.50
789.25
Jumlah 148,912.22
Overhead & keuntungan 10% : 14,891.22
Jumlah : 163,803.44
Dibulatkan : 163,800.00

6.P.Pek.Jalan / HAL 534 DARI 616


SUB. JUMLAH JUMLAH
Rp. Rp.
6 7

183,165.41
183,165.41
1,330.50
1,062.31
268.19
Jumlah 184,495.91
Overhead & keuntungan 10% : 18,449.59
Jumlah : 202,945.50
Dibulatkan : 202,900.00

6.P.Pek.Jalan / HAL 535 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
A.7.1.1 PEKERJAAN TANAMAN

1 1 M3 Pek. Galian lubang tanam pada tanah biasa maks kedalaman 1 M'
Pekerja 0.7500 org 89,320.00
Mandor 0.0250 org 157,850.00

Overhead & keu

1 1 M3 Pek. Galian lubang tanam pada tanah biasa maks kedalaman 1 M'
2 1M3 Urugan Tanah Humus / Timbunan
Bahan :
Tanah Urug gembur 1.1000 m3 137,203.00
Tenaga :
Pekerja 0.2500 org 89,320.00
Mandor 0.0250 org 157,850.00

Overhead & keu

2 1M3 Urugan Tanah Humus / Timbunan


3 1 M3 Pek. Pemadatan dan pengolahan Tanah urugan
Pekerja 0.5000 org 89,320.00
Mandor 0.0500 org 157,850.00

Overhead & keu

3 1 M3 Pek. Pemadatan dan pengolahan Tanah urugan


4 1 M3 Buangan siasa Pekerjaan keluar Lokasi Max 30 M
Pekerja 0.3300 org 89,320.00
Mandor 0.0100 org 157,850.00

Overhead & keu

4 1 M3 Buangan siasa Pekerjaan keluar Lokasi Max 30 M


5 1.lbg. Lubang Tanam dan pengolahan untuk Pohon
Galian Tanah 60x60x60 0.2160 m3 70,936.25
Penimbunan Kembali lubang tanam 0.0648 m3 24,827.69
Tambahan Urugan Tanah Humus perlubang 0.0432 m3 177,199.55

Overhead & keu

5 1.lbg. Lubang Tanam dan pengolahan untuk Pohon


6 1 M2 Penyiraman Tanaman
Bahan :
Air Baku 0.1500 m3 4,500.00
Tenaga :
Pekerja 0.0225 org 89,320.00
Mandor 0.0004 org 157,850.00
Peralatan 1.0000 Lot 411.23

Overhead & keu

6 1 M2 Penyiraman Tanaman

A.7.1.1.Tanaman / HAL 536 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
7 1 M2 Pemupukan dan Pendangiran
Bahan :
Pupuk Anorganik 0.1000 kg 3,500.00
Pupuk Organik 0.3000 m3 4,500.00
Tenaga :
Pekerja 0.0450 org 89,320.00
Tukang Taman terampil 0.0180 org 137,445.00
Kepala Tukang 0.0036 org 157,850.00
Mandor 0.0004 org 157,850.00

Peralatan 1.0000 Lot 1,322.77

Overhead & keu

7 1 M2 Pemupukan dan Pendangiran


a. Penanaman pohon peneduh
8 1 pohon Penanaman Pohon Bintaro t=300 cm
Bahan :
Pohon Bintaro t=300 cm 1.0000 phn 309,129.70
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

8 1 pohon Penanaman Pohon Bintaro t=300 cm


9 1 pohon Penanaman Pohon Akasia mangium t=3m
Bahan :
Pohon Akasia mangium t=3m 1.0000 phn 99,000.00
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

9 1 pohon Penanaman Pohon Akasia mangium t=3m


10 1 pohon Penanaman Dadap Merah t=2 - 4 m
Bahan :
Dadap Merah t=2 - 4 m 1.0000 phn 196,828.50
A.7.1.1.Tanaman / HAL 537 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

10 1 pohon Penanaman Dadap Merah t=2 - 4 m

A.7.1.1.Tanaman / HAL 538 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
11 1 pohon Penanaman Pohon trembesi t = 3,00 m
Bahan :
Pohon trembesi t = 3,00 m 1.0000 phn 107,328.10
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

11 1 pohon Penanaman Pohon trembesi t = 3,00 m


12 1 pohon Penanaman Angsana Tinggi 100 cm
Bahan :
Angsana Tinggi 100 cm 1.0000 phn 8,246.70
Ajir dolken uk.(dia 1" x 1 m) 0.0556 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0378 m3 24,586.08
Pemupukan 0.0756 m2 10,141.27
Penyiraman 0.0756 m2 3,152.75

Overhead & keu

12 1 pohon Penanaman Angsana Tinggi 100 cm


13 1 pohon Penanaman Pohon Cabefuya Caraiba `t=3m Jenis pohon peneduh
Bahan :
Pohon Cabefuya Caraiba `t=3m Jenis pohon peneduh 1.0000 phn 200,346.30
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

13 1 pohon Penanaman Pohon Cabefuya Caraiba `t=3m Jenis pohon peneduh


14 1 pohon Penanaman Pohon plamboyan t=300cm
Bahan :
A.7.1.1.Tanaman / HAL 539 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Pohon plamboyan t=300cm 1.0000 phn 137,500.00
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

14 1 pohon Penanaman Pohon plamboyan t=300cm

A.7.1.1.Tanaman / HAL 540 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
15 1 pohon Penanaman Pohon bungur t=1,5 -3 m
Bahan :
Pohon bungur t=1,5 -3 m 1.0000 phn 41,233.50
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

15 1 pohon Penanaman Pohon bungur t=1,5 -3 m


16 1 pohon Penanaman Pohon kiara payung t=300cm
Bahan :
Pohon kiara payung t=300cm 1.0000 phn 286,209.00
Alat Bantu / Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

16 1 pohon Penanaman Pohon kiara payung t=300cm


17 1 pohon Penanaman Pohon Kupu-kupu t=300cm
Bahan :
Pohon Kupu-kupu t=300cm 1.0000 phn 214,656.20
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

17 1 pohon Penanaman Pohon Kupu-kupu t=300cm


18 1 pohon Penanaman Pohon Mahoni t= 2,5 - 3 m
Bahan :
A.7.1.1.Tanaman / HAL 541 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Pohon Mahoni t= 2,5 - 3 m 1.0000 phn 314,829.90
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

18 1 pohon Penanaman Pohon Mahoni t= 2,5 - 3 m

A.7.1.1.Tanaman / HAL 542 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
19 1 pohon Penanaman Pohon Angsana T=300cm
Bahan :
Pohon Angsana T=300cm 1.0000 phn 181,500.00
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

19 1 pohon Penanaman Pohon Angsana T=300cm


20 1 pohon Penanaman Pohon Ketapang laut t= 2 - 4 m
Bahan :
Pohon Ketapang laut t= 2 - 4 m 1.0000 phn 266,805.00
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

20 1 pohon Penanaman Pohon Ketapang laut t= 2 - 4 m


21 1 pohon Penanaman Pohon Ketapang kencana t= 2 - 4 m
Bahan :
Pohon Ketapang kencana t= 2 - 4 m 1.0000 plb 286,209.00
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

21 1 pohon Penanaman Pohon Ketapang kencana t= 2 - 4 m


22 1 pohon Penanaman Pohon Tanjung t= 2,5 - 3 m
Bahan :
A.7.1.1.Tanaman / HAL 543 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Pohon Tanjung t= 2,5 - 3 m 1.0000 plb 322,712.50
Ajir dolken uk.(dia 3" x 4 m) 0.1667 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1250 m3 24,586.08
Pemupukan 0.2500 m2 10,141.27
Penyiraman 0.2500 m2 3,152.75

Overhead & keu

22 1 pohon Penanaman Pohon Tanjung t= 2,5 - 3 m

A.7.1.1.Tanaman / HAL 544 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
23 1 pohon Penanaman Pohon Kiara payung T= 1 - 2 m
Bahan :
Pohon Kiara payung T= 1 - 2 m 1.0000 phn 34,684.10
Ajir dolken uk.(dia 1" x 1 m) 0.0556 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0800 m3 24,586.08
Pemupukan 0.2000 m2 10,141.27
Penyiraman 0.2000 m2 3,152.75

Overhead & keu

23 1 pohon Penanaman Pohon Kiara payung T= 1 - 2 m


b. Penanaman pohon pagar
24 1 m'. Penanaman Bambu Jepang (2 s/d 3m)
Bahan :
Bambu Jepang (2 s/d 3m) 5.0000 phn 28,983.90
Ajir dolken uk.(dia 3" x 4 m) 1.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1800 org 89,320.00
Tukang Taman terampil 0.0720 org 137,445.00
Kepala Tukang 0.0144 org 157,850.00
Mandor 0.0012 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1750 m3 24,586.08
Pemupukan 0.3500 m2 10,141.27
Penyiraman 0.3500 m2 3,152.75

Overhead & keu

24 1 m'. Penanaman Bambu Jepang (2 s/d 3m)


25 1 m'. Penanaman Bambu Kuning (2 s/d 3m)
Bahan :
Bambu Kuning (2 s/d 3m) 5.0000 phn 18,796.80
Ajir dolken uk.(dia 3" x 4 m) 1.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.1800 org 89,320.00
Tukang Taman terampil 0.0720 org 137,445.00
Kepala Tukang 0.0144 org 157,850.00
Mandor 0.0012 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1750 m3 24,586.08
Pemupukan 0.3500 m2 10,141.27
Penyiraman 0.3500 m2 3,152.75

Overhead & keu

25 1 m'. Penanaman Bambu Kuning (2 s/d 3m)

A.7.1.1.Tanaman / HAL 545 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
c. Penanaman pohon berbuah
26 1 pohon Penanaman Pohon Nangka tinggi 100cm
Bahan :
Pohon Nangka tinggi 100cm 1.0000 phn 17,463.60
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0613 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

26 1 pohon Penanaman Pohon Nangka tinggi 100cm


27 1 pohon Penanaman Pohon Sukun t=1,5 - 2 m
Bahan :
Pohon Sukun t=1,5 - 2 m 1.0000 phn 38,685.90
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0840 org 89,320.00
Tukang Taman terampil 0.0336 org 137,445.00
Kepala Tukang 0.0067 org 157,850.00
Mandor 0.0006 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0800 m3 24,586.08
Pemupukan 0.1600 m2 10,141.27
Penyiraman 0.1600 m2 3,152.75

Overhead & keu

27 1 pohon Penanaman Pohon Sukun t=1,5 - 2 m


28 1 pohon Penanaman Pohon Kelengkeng t=1 m
Bahan :
Pohon Kelengkeng t=1 m 1.0000 phn 181,912.50
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0613 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

28 1 pohon Penanaman Pohon Kelengkeng t=1 m


d. Penanaman tanaman hias
A.7.1.1.Tanaman / HAL 546 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
29 1 pohon Penanaman Bunga sepatu t = 30 - 50 cm
Bahan :
Bunga sepatu t = 30 - 50 cm 1.0000 phn 9,350.00
Ajir dolken uk.(dia 3" x 4 m) 0.1250 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0125 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

29 1 pohon Penanaman Bunga sepatu t = 30 - 50 cm

A.7.1.1.Tanaman / HAL 547 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
30 1 pohon Penanaman Hanjuang merah t = 50 - 60 cm
Bahan :
Hanjuang merah t = 50 - 60 cm 1.0000 phn 10,793.20
Ajir dolken uk.(dia 3" x 4 m) 0.1250 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0188 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

30 1 pohon Penanaman Hanjuang merah t = 50 - 60 cm


31 1 pohon Penanaman Kemuning t = 30 - 35 cm
Bahan :
Kemuning t = 30 - 35 cm 1.0000 phn 5,336.10
Ajir dolken uk.(dia 3" x 4 m) 0.1250 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0125 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

31 1 pohon Penanaman Kemuning t = 30 - 35 cm


32 1 pohon Penanaman Anturium GC t = 40 - 50 cm
Bahan :
Anturium GC t = 40 - 50 cm 1.0000 phn 71,551.70
Ajir dolken uk.(dia 3" x 4 m) 0.1250 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0188 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

32 1 pohon Penanaman Anturium GC t = 40 - 50 cm


33 1 pohon Penanaman Pohon kaca piring tinggi 40cm
Bahan :
A.7.1.1.Tanaman / HAL 548 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Pohon kaca piring tinggi 40cm 1.0000 phn 35,169.20
Ajir dolken uk.(dia 3" x 4 m) 0.1250 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0188 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

33 1 pohon Penanaman Pohon kaca piring tinggi 40cm

A.7.1.1.Tanaman / HAL 549 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
34 1 pohon Penanaman Palem botol t=100cm
Bahan :
Palem botol t=100cm 1.0000 phn 71,551.70
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0613 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

34 1 pohon Penanaman Palem botol t=100cm


35 1 pohon Penanaman Palem putri t=100cm
Bahan :
Palem putri t=100cm 1.0000 phn 5,500,000.00
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0613 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

35 1 pohon Penanaman Palem putri t=100cm


36 1 pohon Penanaman Pohon semak mahkota duri
Bahan :
Pohon semak mahkota duri 1.0000 phn 38,500.00
Ajir dolken uk.(dia 3" x 4 m) 0.1250 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0188 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

36 1 pohon Penanaman Pohon semak mahkota duri


37 1 pohon Penanaman Pohon pisang - pisangan
Bahan :
A.7.1.1.Tanaman / HAL 550 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Pohon pisang - pisangan 1.0000 phn 14,553.00
Ajir dolken uk.(dia 3" x 4 m) 0.1250 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0188 m3 24,586.08
Pemupukan 0.1225 m2 10,141.27
Penyiraman 0.1225 m2 3,152.75

Overhead & keu

37 1 pohon Penanaman Pohon pisang - pisangan

A.7.1.1.Tanaman / HAL 551 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
38 1 rumpun Penanaman Pohon semak hias taiwan beuty
Bahan :
Pohon semak hias taiwan beuty 5.0000 btg 13,750.00
Tenaga ( Upah menanam ) :
Pekerja 0.0800 org 89,320.00
Tukang Taman terampil 0.0340 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0017 org 157,850.00
Pekerjaan pendukung :
Urugan Tanah Humus / Timbunan 0.1000 m3 177,199.55
Pemupukan 0.5000 m2 10,141.27
Penyiraman 0.5000 m2 3,152.75

Overhead & keu

38 1 rumpun Penanaman Pohon semak hias taiwan beuty


39 1 M' Penanaman Teh-Tehan ( Duranta)
Bahan :
Teh-Tehan ( Duranta) 5.0000 Plbg 4,486.90
Tenaga ( Upah menanam ) :
Pekerja 0.0800 org 89,320.00
Tukang Taman terampil 0.0340 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0017 org 157,850.00
Pekerjaan pendukung :
Urugan Tanah Humus / Timbunan 0.1000 m3 177,199.55
Pemupukan 0.5000 m2 10,141.27
Penyiraman 0.5000 m2 3,152.75

Overhead & keu

39 1 M' Penanaman Teh-Tehan ( Duranta)


40 1 pohon Penanaman Pohon Biola cantik t=1 - 2 m
Bahan :
Pohon Biola cantik t=1 - 2 m 1.0000 phn 78,828.20
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0800 m3 24,586.08
Pemupukan 0.1600 m2 10,141.27
Penyiraman 0.1600 m2 3,152.75

Overhead & keu

40 1 pohon Penanaman Pohon Biola cantik t=1 - 2 m


41 1 pohon Penanaman Pohon Jabon t= 70 cm - 80 cm
Bahan :
Pohon Jabon t= 70 cm - 80 cm 1.0000 phn 4,972.00
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
A.7.1.1.Tanaman / HAL 552 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0315 m3 24,586.08
Pemupukan 0.0900 m2 10,141.27
Penyiraman 0.0900 m2 3,152.75

Overhead & keu

41 1 pohon Penanaman Pohon Jabon t= 70 cm - 80 cm

A.7.1.1.Tanaman / HAL 553 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
42 1 pohon Penanaman Pohon Kasia kuning t=1 m
Bahan :
Pohon Kasia kuning t=1 m 1.0000 phn 60,637.50
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0800 m3 24,586.08
Pemupukan 0.1600 m2 10,141.27
Penyiraman 0.1600 m2 3,152.75

Overhead & keu

42 1 pohon Penanaman Pohon Kasia kuning t=1 m


43 1 rumpun Penanaman Aires polybeg 20 ( 1 Rumpun=1m2 ---25 pohon )
Bahan :
Aires polybeg 20 ( 1 Rumpun=1m2 ---25 pohon ) 25.0000 Plbg 4,950.00
Tenaga ( Upah menanam ) :
Pekerja 0.0800 org 89,320.00
Tukang Taman terampil 0.0340 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0017 org 157,850.00
Pekerjaan pendukung :
Urugan Tanah Humus / Timbunan 0.1000 m3 177,199.55
Pemupukan 0.5000 m2 10,141.27
Penyiraman 0.5000 m2 3,152.75

Overhead & keu

43 1 rumpun Penanaman Aires polybeg 20 ( 1 Rumpun=1m2 ---25 pohon )


44 1 rumpun Penanaman Lantana polybeg 20 ( 1 Rumpun=1m2 ---25 pohon )
Bahan :
Lantana polybeg 20 ( 1 Rumpun=1m2 ---25 pohon ) 25.0000 pohon 3,880.80
Tenaga ( Upah menanam ) :
Pekerja 0.0800 org 89,320.00
Tukang Taman terampil 0.0340 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0017 org 157,850.00
Pekerjaan pendukung :
Urugan Tanah Humus / Timbunan 0.1000 m3 177,199.55
Pemupukan 0.5000 m2 10,141.27
Penyiraman 0.5000 m2 3,152.75

Overhead & keu

44 1 rumpun Penanaman Lantana polybeg 20 ( 1 Rumpun=1m2 ---25 pohon )


45 1 rumpun Penanaman Tegetes polybeg 20 ( 1 Rumpun=1m2 ---25 pohon )
Bahan :
Tegetes polybeg 20 ( 1 Rumpun=1m2 ---25 pohon ) 25.0000 pohon 3,880.80
Tenaga ( Upah menanam ) :
A.7.1.1.Tanaman / HAL 554 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Pekerja 0.0800 org 89,320.00
Tukang Taman terampil 0.0340 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0017 org 157,850.00
Pekerjaan pendukung :
Urugan Tanah Humus / Timbunan 0.1000 m3 177,199.55
Pemupukan 0.5000 m2 10,141.27
Penyiraman 0.5000 m2 3,152.75

Overhead & keu

45 1 rumpun Penanaman Tegetes polybeg 20 ( 1 Rumpun=1m2 ---25 pohon )

A.7.1.1.Tanaman / HAL 555 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
46 1 pohon Penanaman Pohon hias bougenville tunggal t = 50 cm
Bahan :
Pohon hias bougenville tunggal t = 50 cm 1.0000 pohon 42,930.80
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0315 m3 24,586.08
Pemupukan 0.0900 m2 10,141.27
Penyiraman 0.0900 m2 3,152.75

Overhead & keu

46 1 pohon Penanaman Pohon hias bougenville tunggal t = 50 cm


47 1 pohon Penanaman Pohon hias bougenville campur 3 warna t = 100 cm
Pohon hias bougenville campur 3 warna t = 100 cm 1.0000 pohon 106,357.90
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0315 m3 24,586.08
Pemupukan 0.0900 m2 10,141.27
Penyiraman 0.0900 m2 3,152.75

Overhead & keu

47 1 pohon Penanaman Pohon hias bougenville campur 3 warna t = 100 cm


48 1 pohon Penanaman Pohon hias bougenville sambung t = 50 cm
Bahan :
Pohon hias bougenville sambung t = 50 cm 1.0000 pohon 57,726.90
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0315 m3 24,586.08
Pemupukan 0.0900 m2 10,141.27
Penyiraman 0.0900 m2 3,152.75

Overhead & keu

48 1 pohon Penanaman Pohon hias bougenville sambung t = 50 cm


49 1 pohon Penanaman Perdu Oleander
Bahan :
Perdu Oleander 1.0000 pohon 28,498.80
A.7.1.1.Tanaman / HAL 556 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Ajir dolken uk.(dia 3" x 4 m) 0.2500 btg 20,000.00
Tenaga ( Upah menanam ) :
Pekerja 0.0420 org 89,320.00
Tukang Taman terampil 0.0168 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0003 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.0315 m3 24,586.08
Pemupukan 0.0900 m2 10,141.27
Penyiraman 0.0900 m2 3,152.75

Overhead & keu

49 1 pohon Penanaman Perdu Oleander

A.7.1.1.Tanaman / HAL 557 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
50 1 Rumpun Penanaman Azalea Ungu Polybag 30
Bahan :
Azalea Ungu Polybag 30 10.0000 pohon 2,849.00
Tenaga ( Upah menanam ) :
Pekerja 0.0800 org 89,320.00
Tukang Taman terampil 0.0340 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0017 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1000 m3 24,586.08
Pemupukan 0.5000 m2 10,141.27
Penyiraman 0.5000 m2 3,152.75

Overhead & keu

50 1 Rumpun Penanaman Azalea Ungu Polybag 30


51 1 Rumpun Penanaman Azalea Hibrit Polybag 30
Bahan :
Azalea Hibrit Polybag 30 10.0000 pohon 6,063.20
Tenaga ( Upah menanam ) :
Pekerja 0.0800 org 89,320.00
Tukang Taman terampil 0.0340 org 137,445.00
Kepala Tukang 0.0034 org 157,850.00
Mandor 0.0017 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1000 m3 24,586.08
Pemupukan 0.5000 m2 10,141.27
Penyiraman 0.5000 m2 3,152.75

Overhead & keu

51 1 Rumpun Penanaman Azalea Hibrit Polybag 30


52 1 Rumpun Penanaman Bayam Merah Polybag 30
Bahan :
Bayam Merah Polybag 30 25.0000 Plbg 3,031.60
Tenaga ( Upah menanam ) :
Pekerja 0.1200 org 89,320.00
Tukang Taman terampil 0.0480 org 137,445.00
Kepala Tukang 0.0096 org 157,850.00
Mandor 0.0008 org 157,850.00
Pekerjaan pendukung :
Lubang Tanam dan pengolahan untuk Pohon 0.1000 m3 24,586.08
Pemupukan 0.5000 m2 10,141.27
Penyiraman 0.5000 m2 3,152.75

Overhead & keu

52 1 Rumpun Penanaman Bayam Merah Polybag 30


53 1M2. Penanaman Rumput Gajah
Bahan :
Rumput Gajah 1.0500 m2 9,094.80
Tenaga ( Upah menanam ) :
Pekerja 0.0600 org 89,320.00
A.7.1.1.Tanaman / HAL 558 DARI 616
ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
Tukang Taman terampil 0.0240 org 137,445.00
Kepala Tukang 0.0024 org 157,850.00
Mandor 0.0012 org 157,850.00
Pekerjaan pendukung :
Urugan Tanah Humus / Timbunan 0.2000 m3 177,199.55
Pemupukan 1.0500 m2 10,141.27
Penyiraman 1.0500 m2 3,152.75

Overhead & keu

53 1M2. Penanaman Rumput Gajah

A.7.1.1.Tanaman / HAL 559 DARI 616


ANALISA HARGA SATUAN PEKERJAAN NON SNI
NO. URAIAN KOEF SATUAN H. SATUAN
Rp.
1 2 3 4 5
54 1M2. Penanaman Rumput jepang
Bahan :
Rumput jepang 1.0500 m2 22,435.60
Tenaga ( Upah menanam ) :
Pekerja 0.0600 org 89,320.00
Tukang Taman terampil 0.0240 org 137,445.00
Kepala Tukang 0.0024 org 157,850.00
Mandor 0.0012 org 157,850.00
Pekerjaan pendukung :
Urugan Tanah Humus / Timbunan 0.2000 m3 177,199.55
Pemupukan 1.0500 m2 10,141.27
Penyiraman 1.0500 m2 3,152.75

Overhead & keu

54 1M2. Penanaman Rumput jepang


55 1M2. Penanaman Rumput peking
Bahan :
Rumput peking 1.0500 m2 7,882.60
Tenaga ( Upah menanam ) :
Pekerja 0.0600 org 89,320.00
Tukang Taman terampil 0.0240 org 137,445.00
Kepala Tukang 0.0024 org 157,850.00
Mandor 0.0012 org 157,850.00
Pekerjaan pendukung :
Urugan Tanah Humus / Timbunan 0.2000 m3 177,199.55
Pemupukan 1.0500 m2 10,141.27
Penyiraman 1.0500 m2 3,152.75

Overhead & keu

55 1M2. Penanaman Rumput peking


56 1M2. Penanaman Rumput bermuda
Bahan :
Rumput bermuda ( harga terpasang ) 1.0500 m2 112,543.20

Overhead & keu

56 1M2. Penanaman Rumput bermuda

A.7.1.1.Tanaman / HAL 560 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

66,990.00
3,946.25
Jumlah : 70,936.25
Overhead & keuntungan 10% : 7,093.63
Jumlah : 78,029.88
Dibulatkan : 78,000.00

150,923.30
150,923.30
26,276.25
22,330.00
3,946.25
Jumlah : 177,199.55
Overhead & keuntungan 10% : 17,719.96
Jumlah : 194,919.51
Dibulatkan : 194,900.00

44,660.00
7,892.50
Jumlah : 52,552.50
Overhead & keuntungan 10% : 5,255.25
Jumlah : 57,807.75
Dibulatkan : 57,800.00

29,475.60
1,578.50
Jumlah : 31,054.10
Overhead & keuntungan 10% : 3,105.41
Jumlah : 34,159.51
Dibulatkan : 34,100.00

15,322.23
1,608.83
7,655.02
Jumlah : 24,586.08
Overhead & keuntungan 10% : 2,458.61
Jumlah : 27,044.69
Dibulatkan : 27,000.00

675.00
675.00
2,066.53
2,009.70
56.83
411.23 411.23
Jumlah : 3,152.75
Overhead & keuntungan 10% : 315.28
Jumlah : 3,468.03
Dibulatkan : 3,400.00

A.7.1.1.Tanaman / HAL 561 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

1,700.00
350.00
1,350.00
7,118.50
4,019.40
2,474.01
568.26
56.83

1,322.77 1,322.77
Jumlah : 10,141.27
Overhead & keuntungan 10% : 1,014.13
Jumlah : 11,155.40
Dibulatkan : 11,100.00

312,463.03
309,129.70
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 337,817.20
Overhead & keuntungan 10% : 33,781.72
Jumlah : 371,598.92
Dibulatkan : 371,500.00

102,333.33
99,000.00
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 127,687.50
Overhead & keuntungan 10% : 12,768.75
Jumlah : 140,456.25
Dibulatkan : 140,400.00

200,161.83
196,828.50
A.7.1.1.Tanaman / HAL 562 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
3,333.33
- 18,957.40
10,718.40
6,597.36
1,515.36
126.28
- 6,396.77
3,073.26
2,535.32
788.19
Jumlah : 225,516.00
Overhead & keuntungan 10% : 22,551.60
Jumlah : 248,067.60
Dibulatkan : 248,000.00

A.7.1.1.Tanaman / HAL 563 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

110,661.43
107,328.10
3,333.33
- 18,957.40
10,718.40
6,597.36
1,515.36
126.28
- 6,396.77
3,073.26
2,535.32
788.19
Jumlah : 136,015.60
Overhead & keuntungan 10% : 13,601.56
Jumlah : 149,617.16
Dibulatkan : 149,600.00

9,357.81
8,246.70
1,111.11
- 6,635.09
3,751.44
2,309.08
530.38
44.20
- 1,934.38
929.35
766.68
238.35
Jumlah : 17,927.28
Overhead & keuntungan 10% : 1,792.73
Jumlah : 19,720.01
Dibulatkan : 19,700.00

203,679.63
200,346.30
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 229,033.80
Overhead & keuntungan 10% : 22,903.38
Jumlah : 251,937.18
Dibulatkan : 251,900.00

140,833.33
A.7.1.1.Tanaman / HAL 564 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
137,500.00
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 166,187.50
Overhead & keuntungan 10% : 16,618.75
Jumlah : 182,806.25
Dibulatkan : 182,800.00

A.7.1.1.Tanaman / HAL 565 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

44,566.83
41,233.50
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 69,921.00
Overhead & keuntungan 10% : 6,992.10
Jumlah : 76,913.10
Dibulatkan : 76,900.00

289,542.33
286,209.00
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 314,896.50
Overhead & keuntungan 10% : 31,489.65
Jumlah : 346,386.15
Dibulatkan : 346,300.00

217,989.53
214,656.20
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 243,343.70
Overhead & keuntungan 10% : 24,334.37
Jumlah : 267,678.07
Dibulatkan : 267,600.00

318,163.23
A.7.1.1.Tanaman / HAL 566 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
314,829.90
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 343,517.40
Overhead & keuntungan 10% : 34,351.74
Jumlah : 377,869.14
Dibulatkan : 377,800.00

A.7.1.1.Tanaman / HAL 567 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

184,833.33
181,500.00
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 210,187.50
Overhead & keuntungan 10% : 21,018.75
Jumlah : 231,206.25
Dibulatkan : 231,200.00

270,138.33
266,805.00
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 295,492.50
Overhead & keuntungan 10% : 29,549.25
Jumlah : 325,041.75
Dibulatkan : 325,000.00

289,542.33
286,209.00
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 314,896.50
Overhead & keuntungan 10% : 31,489.65
Jumlah : 346,386.15
Dibulatkan : 346,300.00

326,045.83
A.7.1.1.Tanaman / HAL 568 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
322,712.50
3,333.33
18,957.40
10,718.40
6,597.36
1,515.36
126.28
6,396.77
3,073.26
2,535.32
788.19
Jumlah : 351,400.00
Overhead & keuntungan 10% : 35,140.00
Jumlah : 386,540.00
Dibulatkan : 386,500.00

A.7.1.1.Tanaman / HAL 569 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

35,795.21
34,684.10
1,111.11
6,635.09
3,751.44
2,309.08
530.38
44.20
4,625.69
1,966.89
2,028.25
630.55
Jumlah : 47,055.99
Overhead & keuntungan 10% : 4,705.60
Jumlah : 51,761.59
Dibulatkan : 51,700.00

169,919.50
144,919.50
25,000.00
28,436.10
16,077.60
9,896.04
2,273.04
189.42
8,955.47
4,302.56
3,549.44
1,103.46
Jumlah : 207,311.07
Overhead & keuntungan 10% : 20,731.11
Jumlah : 228,042.18
Dibulatkan : 228,000.00

118,984.00
93,984.00
25,000.00
- 28,436.10
16,077.60
9,896.04
2,273.04
189.42
- 8,955.47
4,302.56
3,549.44
1,103.46
Jumlah : 156,375.57
Overhead & keuntungan 10% : 15,637.56
Jumlah : 172,013.13
Dibulatkan : 172,000.00

A.7.1.1.Tanaman / HAL 570 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

22,463.60
17,463.60
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
3,134.42
1,505.90
1,242.31
386.21
Jumlah : 32,233.11
Overhead & keuntungan 10% : 3,223.31
Jumlah : 35,456.42
Dibulatkan : 35,400.00

43,685.90
38,685.90
5,000.00
13,270.18
7,502.88
4,618.15
1,060.75
88.40
4,093.93
1,966.89
1,622.60
504.44
Jumlah : 61,050.01
Overhead & keuntungan 10% : 6,105.00
Jumlah : 67,155.01
Dibulatkan : 67,100.00

186,912.50
181,912.50
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
3,134.42
1,505.90
1,242.31
386.21
Jumlah : 196,682.01
Overhead & keuntungan 10% : 19,668.20
Jumlah : 216,350.21
Dibulatkan : 216,300.00

A.7.1.1.Tanaman / HAL 571 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

11,850.00
9,350.00
2,500.00
6,635.09
3,751.44
2,309.08
530.38
44.20
1,935.84
307.33
1,242.31
386.21
Jumlah : 20,420.93
Overhead & keuntungan 10% : 2,042.09
Jumlah : 22,463.03
Dibulatkan : 22,400.00

A.7.1.1.Tanaman / HAL 572 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

13,293.20
10,793.20
2,500.00
6,635.09
3,751.44
2,309.08
530.38
44.20
2,089.51
460.99
1,242.31
386.21
Jumlah : 22,017.80
Overhead & keuntungan 10% : 2,201.78
Jumlah : 24,219.58
Dibulatkan : 24,200.00

7,836.10
5,336.10
2,500.00
6,635.09
3,751.44
2,309.08
530.38
44.20
1,935.84
307.33
1,242.31
386.21
Jumlah : 16,407.03
Overhead & keuntungan 10% : 1,640.70
Jumlah : 18,047.74
Dibulatkan : 18,000.00

74,051.70
71,551.70
2,500.00
6,635.09
3,751.44
2,309.08
530.38
44.20
2,089.51
460.99
1,242.31
386.21
Jumlah : 82,776.30
Overhead & keuntungan 10% : 8,277.63
Jumlah : 91,053.93
Dibulatkan : 91,000.00

37,669.20
A.7.1.1.Tanaman / HAL 573 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
35,169.20
2,500.00
6,635.09
3,751.44
2,309.08
530.38
44.20
2,089.51
460.99
1,242.31
386.21
Jumlah : 46,393.80
Overhead & keuntungan 10% : 4,639.38
Jumlah : 51,033.18
Dibulatkan : 51,000.00

A.7.1.1.Tanaman / HAL 574 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

76,551.70
71,551.70
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
3,134.42
1,505.90
1,242.31
386.21
Jumlah : 86,321.21
Overhead & keuntungan 10% : 8,632.12
Jumlah : 94,953.33
Dibulatkan : 94,900.00

5,505,000.00
5,500,000.00
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
3,134.42
1,505.90
1,242.31
386.21
Jumlah : 5,514,769.51
Overhead & keuntungan 10% : 551,476.95
Jumlah : 6,066,246.46
Dibulatkan : 6,066,200.00

41,000.00
38,500.00
2,500.00
6,635.09
3,751.44
2,309.08
530.38
44.20
2,089.51
460.99
1,242.31
386.21
Jumlah : 49,724.60
Overhead & keuntungan 10% : 4,972.46
Jumlah : 54,697.06
Dibulatkan : 54,600.00

17,053.00
A.7.1.1.Tanaman / HAL 575 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
14,553.00
2,500.00
6,635.09
3,751.44
2,309.08
530.38
44.20
2,089.51
460.99
1,242.31
386.21
Jumlah : 25,777.60
Overhead & keuntungan 10% : 2,577.76
Jumlah : 28,355.36
Dibulatkan : 28,300.00

A.7.1.1.Tanaman / HAL 576 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

68,750.00
68,750.00
12,623.77
7,145.60
4,673.13
536.69
268.35
24,366.97
17,719.96
5,070.64
1,576.38
Jumlah : 105,740.73
Overhead & keuntungan 10% : 10,574.07
Jumlah : 116,314.81
Dibulatkan : 116,300.00

22,434.50
22,434.50
12,623.77
7,145.60
4,673.13
536.69
268.35
24,366.97
17,719.96
5,070.64
1,576.38
Jumlah : 59,425.23
Overhead & keuntungan 10% : 5,942.52
Jumlah : 65,367.76
Dibulatkan : 65,300.00

83,828.20
78,828.20
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
4,093.93
1,966.89
1,622.60
504.44
Jumlah : 94,557.22
Overhead & keuntungan 10% : 9,455.72
Jumlah : 104,012.94
Dibulatkan : 104,000.00

9,972.00
4,972.00
5,000.00
A.7.1.1.Tanaman / HAL 577 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
6,635.09
3,751.44
2,309.08
530.38
44.20
1,970.92
774.46
912.71
283.75
Jumlah : 18,578.01
Overhead & keuntungan 10% : 1,857.80
Jumlah : 20,435.82
Dibulatkan : 20,400.00

A.7.1.1.Tanaman / HAL 578 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

65,637.50
60,637.50
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
4,093.93
1,966.89
1,622.60
504.44
Jumlah : 76,366.52
Overhead & keuntungan 10% : 7,636.65
Jumlah : 84,003.17
Dibulatkan : 84,000.00

123,750.00
123,750.00
12,623.77
7,145.60
4,673.13
536.69
268.35
24,366.97
17,719.96
5,070.64
1,576.38
Jumlah : 160,740.73
Overhead & keuntungan 10% : 16,074.07
Jumlah : 176,814.81
Dibulatkan : 176,800.00

97,020.00
97,020.00
12,623.77
7,145.60
4,673.13
536.69
268.35
24,366.97
17,719.96
5,070.64
1,576.38
Jumlah : 134,010.73
Overhead & keuntungan 10% : 13,401.07
Jumlah : 147,411.81
Dibulatkan : 147,400.00

97,020.00
97,020.00
12,623.77
A.7.1.1.Tanaman / HAL 579 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
7,145.60
4,673.13
536.69
268.35
24,366.97
17,719.96
5,070.64
1,576.38
Jumlah : 134,010.73
Overhead & keuntungan 10% : 13,401.07
Jumlah : 147,411.81
Dibulatkan : 147,400.00

A.7.1.1.Tanaman / HAL 580 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

42,930.80
42,930.80
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
1,970.92
774.46
912.71
283.75
Jumlah : 51,536.81
Overhead & keuntungan 10% : 5,153.68
Jumlah : 56,690.50
Dibulatkan : 56,600.00
106,357.90
106,357.90
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
1,970.92
774.46
912.71
283.75
Jumlah : 114,963.91
Overhead & keuntungan 10% : 11,496.39
Jumlah : 126,460.31
Dibulatkan : 126,400.00

57,726.90
57,726.90
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
1,970.92
774.46
912.71
283.75
Jumlah : 66,332.91
Overhead & keuntungan 10% : 6,633.29
Jumlah : 72,966.21
Dibulatkan : 72,900.00

28,498.80
28,498.80
A.7.1.1.Tanaman / HAL 581 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
5,000.00
6,635.09
3,751.44
2,309.08
530.38
44.20
1,970.92
774.46
912.71
283.75
Jumlah : 37,104.81
Overhead & keuntungan 10% : 3,710.48
Jumlah : 40,815.30
Dibulatkan : 40,800.00

A.7.1.1.Tanaman / HAL 582 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

28,490.00
28,490.00
12,623.77
7,145.60
4,673.13
536.69
268.35
9,105.62
2,458.61
5,070.64
1,576.38
Jumlah : 50,219.39
Overhead & keuntungan 10% : 5,021.94
Jumlah : 55,241.32
Dibulatkan : 55,200.00

60,632.00
60,632.00
12,623.77
7,145.60
4,673.13
536.69
268.35
9,105.62
2,458.61
5,070.64
1,576.38
Jumlah : 82,361.39
Overhead & keuntungan 10% : 8,236.14
Jumlah : 90,597.52
Dibulatkan : 90,500.00

75,790.00
75,790.00
18,957.40
10,718.40
6,597.36
1,515.36
126.28
9,105.62
2,458.61
5,070.64
1,576.38
Jumlah : 103,853.02
Overhead & keuntungan 10% : 10,385.30
Jumlah : 114,238.32
Dibulatkan : 114,200.00

9,549.54
9,549.54
9,226.14
5,359.20
A.7.1.1.Tanaman / HAL 583 DARI 616
SUB. JUMLAH JUMLAH
Rp.
6 7
3,298.68
378.84
189.42
49,398.64
35,439.91
10,648.33
3,310.39
Jumlah : 68,174.32
Overhead & keuntungan 10% : 6,817.43
Jumlah : 74,991.75
Dibulatkan : 74,900.00

A.7.1.1.Tanaman / HAL 584 DARI 616


SUB. JUMLAH JUMLAH
Rp.
6 7

23,557.38
23,557.38
9,226.14
5,359.20
3,298.68
378.84
189.42
49,398.64
35,439.91
10,648.33
3,310.39
Jumlah : 82,182.16
Overhead & keuntungan 10% : 8,218.22
Jumlah : 90,400.37
Dibulatkan : 90,400.00

8,276.73
8,276.73
9,226.14
5,359.20
3,298.68
378.84
189.42
49,398.64
35,439.91
10,648.33
3,310.39
Jumlah : 66,901.51
Overhead & keuntungan 10% : 6,690.15
Jumlah : 73,591.66
Dibulatkan : 73,500.00

118,170.36
118,170.36

Jumlah : 118,170.36
Overhead & keuntungan 10% : 11,817.04
Jumlah : 129,987.40
Dibulatkan : 129,900.00

A.7.1.1.Tanaman / HAL 585 DARI 616


Asuranasi

no. Prosen Nilai Kontrak Jumlah


Jamsostek
a. 0.24% 100,000,000.00 240,000.00
b. 0.19% 400,000,000.00 760,000.00
c. 0.15% 500,000,000.00 750,000.00
d. 0.12% 4,000,000,000.00 4,800,000.00
e. 0.10% 195,000,000,000.00 195,000,000.00
Contractor All Rest
CAR 0.15% 200,000,000,000.00 300,000,000.00
Jumlah Asuransi : 501,550,000.00
ANALISA HARGA SATUAN PEKERJAAN FIRE STOP

No URAIAN JENIS PEKERJAAN KOEF SATUAN

1 1M2 FIRESTOP LOCKWELL (Mortar + Sealant)


Firestop Lockwell (Mortar + Sealant)
- Mortar ketebalan 10cm (Fire rating 6 hours) 1.0000 m2
- Sealant 1.0000 m2
- Instalasi 1.0000 Lot

2 1M2 FIRESTOP LOCKWELL (Mortar + Sealant + Cable Coating)


Firestop Lockwell (Mortar + Sealant)
- Mortar ketebalan 10cm (Fire rating 6 hours) 1.0000 m2
- Sealant 1.0000 m2
- Cable Coating (50cm kedua sisi) 1.0000 m2
- Instalasi 1.0000 Lot

3 1M2 FIRESTOP LOCKWELL for FAÇADE

Firestop for Façade 1.0000 m2


- Cable coating DFT 1.6mm (Dual Layer)
- Mineral Wool (Rockwool), density 150kg/m3, ketebalan 5cm
- GRC Board 3.5mm
- Besi siku 3x3
- Installation

analisa Firestop / PAGE - 587


H. SATUAN SUB. JUMLAH JUMLAH
Rp Rp Rp

4,275,000.00 4,275,000.00
110,000.00 110,000.00
510,000.00 510,000.00
Jumlah : 4,895,000.00
Overhead & keuntungan 10% : 489,500.00
Jumlah : 5,384,500.00
Dibulatkan : 5,384,500.00

4,275,000.00 4,275,000.00
110,000.00 110,000.00
400,000.00 400,000.00
510,000.00 510,000.00
Jumlah : 5,295,000.00
Overhead & keuntungan 10% : 529,500.00
Jumlah : 5,824,500.00
Dibulatkan : 5,824,500.00

1,620,000.00 1,620,000.00

Jumlah : 1,620,000.00
Overhead & keuntungan 10% : 162,000.00
Jumlah : 1,782,000.00
Dibulatkan : 1,782,000.00

analisa Firestop / PAGE - 588


ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
1 1 Unit Standing Signage tipe SS-1 & SS-2 ukuran 800x2100 mm
1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 1.10
Terpasang MDF t=12mm 1.10
Terpasang lapisan HPL 1.10
Signika Negative t=100mm terpasang stainless 20.00
Signika Negative t=50mm terpasang Stainless 185.00
Signika Negative t=30mm terpasang Stainless 45.00
Signika Negative t=20 & 15mm terpasang Stainless 854.00
Plat stainless steel t=4,5mm 1.10
Grafir pola batik 1.00
2 Alat batu dan bahan penunjang 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

2 1 Unit Standing Signage tipe SS-3 & SS-4 ukuran 800x2100 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 1.10
Terpasang MDF t=12mm 1.10
Terpasang lapisan HPL 1.10
Signika Negative t=100mm terpasang stainless 20.00
Signika Negative t=50mm terpasang Stainless 185.00
Signika Negative t=30mm terpasang Stainless 45.00
Signika Negative t=20 & 15mm terpasang Stainless 854.00
Plat stainless steel t=4,5mm 1.10
2 Alat batu dan bahan penunjang 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

3 1 Unit Ceilling hanging Signage tipe S2-1 s/d S2-6 & S2-22 s/d S2-24 ukuran 640x1200 mm
1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.77
Terpasang Acrylic t=10mm warna 1.54

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

4 1 Unit Ceilling hanging Signage tipe S2-7 ukuran 200x1200 mm


1 Harga terpasang
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
Terpasang Rangka hollow 40x40x2mm 0.24
Terpasang Acrylic t=10mm warna 0.24

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

5 1 Unit Ceilling hanging Signage tipe S2-8 s/d S2-10 & S2-21 ukuran 200x1200 mm
1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.24
Terpasang Acrylic t=10mm warna 0.48

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

6 1 Unit Ceilling hanging Signage tipe S2-11 & S2-12 & S2-20 ukuran 200x1500 mm
1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.30
Terpasang Acrylic t=10mm warna 0.30

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
7 1 Unit Ceilling hanging Signage tipe S2-13 ukuran 200x1800 mm
1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.36
Terpasang Acrylic t=10mm warna 0.36

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :
8 1 Unit Ceilling hanging Signage tipe S2-14, S2-16 & S2-18 ukuran 200x600 mm
1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.12
Terpasang Acrylic t=10mm warna 0.12

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

9 1 Unit Ceilling hanging Signage tipe S2-15 & S2-19 ukuran 200x1200 mm
1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.24
Terpasang Acrylic t=10mm warna 0.24

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

10 1 Unit Ceilling hanging Signage tipe S2-17 ukuran 200x1800 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.36
Terpasang Acrylic t=10mm warna 0.36

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
Overhead + Profit 10% :
Jumlah & pembulatan :

11 1 Unit Ceilling hanging Signage tipe S2-25 ukuran 420x1200 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.50
Terpasang Acrylic t=10mm warna 1.01

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

12 1 Unit Wall Signage tipe S3-1 & S3-2 ukuran 200x1050 mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

13 1 Unit Wall Signage tipe S3-3 ukuran 300x350 mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

14 1 Unit Wall Signage tipe S3-4 ukuran 350x1550 mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

15 1 Unit Wall Signage tipe S3-5 ukuran 350x1700 mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
Overhead + Profit 10% :
Jumlah & pembulatan :
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
16 1 Unit Wall Signage tipe S3-6 s/d S3-8 ukuran variabel
1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

17 1 Unit Wall Signage tipe S3-9 s/d S3-10 ukuran 400 x 2340mm
1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

18 1 Unit Wall Signage tipe S3-11 ukuran 450 x variabel mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

19 1 Unit Wall Signage tipe S3-12 ukuran 230 x 1350mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

20 1 Unit Wall Signage tipe S3-13 ukuran 230 x 1650mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

20 1 Unit Wall Signage tipe S3-14 ukuran 2800 x 5955mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

21 1 Unit Wall Signage tipe S3-15A ukuran 2800 x 7485mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

22 1 Unit Wall Signage tipe S3-15B ukuran 2800 x 7400mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

23 1 Unit Wall Signage tipe S3-17 & S3-18 ukuran 2520 x 7505mm
1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage

24 1 Unit Wall blade Signage tipe S4-1 ukuran 250x350 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.09
Terpasang Acrylic t=10mm warna 0.18

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

25 1 Unit Room Signage tipe S5-1 ukuran 300x450 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.14
Terpasang MDF t=12mm 0.14
Terpasang lapisan HPL 0.14
Plat stainless steel t=4,5mm 0.07
2 Finishing cat huruf 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

26 1 Unit Room Signage tipe S5-2 ukuran 100x350 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.04
Terpasang Acrylic t=10mm warna 0.04

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

27 1 Unit Room Signage tipe S5-3 ukuran 150x450 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.07
Terpasang Acrylic t=10mm warna 0.07

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
Jumlah & pembulatan :

28 1 Unit Room Signage tipe S5-4 s/d S5-6 ukuran T=200mm


1 Harga terpasang
Terpasang gambar Acrylic t=10mm 20.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

29 1 Unit Room Signage tipe S5-7 ukuran T=200mm ( 2 sub )


1 Harga terpasang
Terpasang gambar Acrylic t=10mm 40.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

30 1 Unit Room Signage tipe S5-8 & S5-9 ukuran 310x300 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.09
Terpasang MDF t=12mm 0.09
Terpasang lapisan HPL 0.09
Terpasang Acrylic t=10mm warna 0.09
2 Finishing cat huruf 1.00
3 Terpasang gambar Alumunium t=2mm 40.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

31 1 Unit Room Signage tipe S5-10 ukuran T=200mm ( 2 sub )


1 Harga terpasang
Terpasang gambar Stiker 40.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
32 1 Unit Floor Signage tipe S6-1 ukuran Ø800
1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

33 1 Unit Floor Signage tipe S6-2 ukuran 2460x1200


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

2 1 Unit Ceilling hanging Signage tipe S7-1 s/d S7-3 ukuran 200x600 mm
1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.12
Terpasang Acrylic t=10mm warna 0.12

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

3 1 Unit Ceilling hanging Signage tipe S7-4 ukuran 200x600 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.12
Terpasang Acrylic t=10mm warna 0.24

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

4 1 Unit Wall Signage tipe S7-5 ukuran 300x1200 mm


1 Harga terpasang
Finishing cat huruf dan Gambar 1.00
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

5 1 Unit Standing Signage tipe S7-6 ukuran 400x600 mm


1 Harga terpasang
Terpasang tiang pipa Ø4" 5.57
Terpasang Rangka pipa Ø2,5" 2.00
Plat alumunium t=3mm 0.24

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

3 Biaya pemasangan :
Galian + pengecoran 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

6 1 Unit Ceilling hanging Signage tipe S7-7 ukuran 200x800 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.16
Terpasang Acrylic t=10mm warna 0.16

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
7 1 Unit Wall Signage tipe S7-8 ukuran 100x700 mm
1 Harga terpasang
Plat alumunium t=3mm 0.07

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

8 1 Unit Wall Signage tipe S7-9 ukuran 100x700 mm


1 Harga terpasang
Plat alumunium t=3mm 0.12

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

9 1 Unit Wall Signage tipe S7-10 ukuran 200x250 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.05
Terpasang Acrylic t=10mm warna 0.05

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

10 1 Unit Ceilling hanging Signage tipe S7-11 & S7-12 ukuran 200x600 mm
1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.12
Terpasang Acrylic t=10mm warna 0.12

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
ANALISA HARGA SATUAN PEKERJAAN

No URAIAN JENIS PEKERJAAN Koef.

1 3 4
R. Harga satuan pekerjaan Signage
Jumlah & pembulatan :

11 1 Unit Standing Signage tipe S7-13 ukuran 400x600 mm


1 Harga terpasang
Terpasang Rangka pipa Ø2,5" 2.00
Plat alumunium t=3mm 0.24

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

3 Biaya pemasangan :
Galian + pengecoran 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

12 1 Unit Ceilling hanging Signage tipe S7-14 ukuran 200x800 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.16
Terpasang Acrylic t=10mm warna 0.32

2 Biaya finishing
Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :

13 1 Unit Standing Signage tipe S7-15 ukuran 300x500 mm


1 Harga terpasang
Terpasang Rangka hollow 40x40x2mm 0.15
Terpasang MDF t=12mm 0.30
Terpasang lapisan HPL 0.30
Terpasang Acrylic t=10mm warna 0.30
2 Finishing cat huruf dan Gambar 1.00

Jumlah :
Overhead + Profit 10% :
Jumlah & pembulatan :
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

12,748,339.74
m2 110,740.67 121,814.73
m2 164,450.00 180,895.00
m2 169,813.21 186,794.54
cm 9,450.00 189,000.00
cm 9,450.00 1,748,250.00
cm 9,450.00 425,250.00
cm 9,450.00 8,070,300.00
m2 1,335,032.25 1,468,535.47
Lot 357,500.00 357,500.00
LS 1,274,833.97 1,274,833.97 1,274,833.97

14,023,173.72
1,402,317.37
15,425,491.00

12,390,839.74
m2 110,740.67 121,814.73
m2 164,450.00 180,895.00
m2 169,813.21 186,794.54
cm 9,450.00 189,000.00
cm 9,450.00 1,748,250.00
cm 9,450.00 425,250.00
cm 9,450.00 8,070,300.00
m2 1,335,032.25 1,468,535.47
LS 1,239,083.97 1,239,083.97 1,239,083.97

13,629,923.72
1,362,992.37
14,992,916.00

uran 640x1200 mm
1,149,966.86
m2 110,740.67 85,048.83
m2 693,306.01 1,064,918.03

LS 713,760.77 713,760.77 713,760.77

1,863,727.63
186,372.76
2,050,100.00

192,971.20
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

m2 110,740.67 26,577.76
m2 693,306.01 166,393.44

LS 111,525.12 111,525.12 111,525.12

304,496.32
30,449.63
334,945.00

359,364.65
m2 110,740.67 26,577.76
m2 693,306.01 332,786.89

LS 223,050.24 223,050.24 223,050.24

582,414.89
58,241.49
640,656.00

241,214.00
m2 110,740.67 33,222.20
m2 693,306.01 207,991.80

LS 139,406.40 139,406.40 139,406.40

380,620.40
38,062.04
418,682.00
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

289,456.80
m2 110,740.67 39,866.64
m2 693,306.01 249,590.16

LS 167,287.68 167,287.68 167,287.68

456,744.48
45,674.45
502,418.00

96,485.60
m2 110,740.67 13,288.88
m2 693,306.01 83,196.72

LS 55,762.56 55,762.56 55,762.56

152,248.16
15,224.82
167,472.00

192,971.20
m2 110,740.67 26,577.76
m2 693,306.01 166,393.44

LS 111,525.12 111,525.12 111,525.12

304,496.32
30,449.63
334,945.00

289,456.80
m2 110,740.67 39,866.64
m2 693,306.01 249,590.16

LS 167,287.68 167,287.68 167,287.68

456,744.48
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

45,674.45
502,418.00

754,665.76
m2 110,740.67 55,813.30
m2 693,306.01 698,852.46

LS 468,405.50 468,405.50 468,405.50

1,223,071.26
122,307.13
1,345,378.00

Lot 195,168.96 195,168.96 195,168.96

195,168.96
19,516.90
214,685.00

Lot 97,584.48 97,584.48 97,584.48

97,584.48
9,758.45
107,342.00

Lot 378,139.86 378,139.86 378,139.86

378,139.86
37,813.99
415,953.00

Lot 414,734.04 414,734.04 414,734.04

414,734.04
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

41,473.40
456,207.00
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

Lot 421,704.36 421,704.36 421,704.36

421,704.36
42,170.44
463,874.00

Lot 652,421.95 652,421.95 652,421.95

652,421.95
65,242.20
717,664.00

Lot 345,030.84 345,030.84 345,030.84

345,030.84
34,503.08
379,533.00

Lot 216,428.44 216,428.44 216,428.44

216,428.44
21,642.84
238,071.00

Lot 264,523.64 264,523.64 264,523.64

264,523.64
26,452.36
290,976.00

Lot 3,874,299.02 3,874,299.02 3,874,299.02


H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

3,874,299.02
387,429.90
4,261,728.00

Lot 9,738,931.10 9,738,931.10 9,738,931.10

9,738,931.10
973,893.11
10,712,824.00

Lot 9,628,335.36 9,628,335.36 9,628,335.36

9,628,335.36
962,833.54
10,591,168.00

Lot 8,788,458.27 8,788,458.27 8,788,458.27

8,788,458.27
878,845.83
9,667,304.00
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

131,018.36
m2 110,740.67 9,689.81
m2 693,306.01 121,328.55

LS 81,320.40 81,320.40 81,320.40

212,338.76
21,233.88
233,572.00

150,190.20
m2 110,740.67 14,949.99
m2 164,450.00 22,200.75
m2 169,813.21 22,924.78
m2 1,335,032.25 90,114.68
LS 31,366.44 31,366.44 31,366.44

181,556.64
18,155.66
199,712.00

28,141.63
m2 110,740.67 3,875.92
m2 693,306.01 24,265.71

LS 16,264.08 16,264.08 16,264.08

44,405.71
4,440.57
48,846.00

54,273.15
m2 110,740.67 7,475.00
m2 693,306.01 46,798.16

LS 31,366.44 31,366.44 31,366.44

85,639.59
8,563.96
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

94,203.00

126,000.00
cm 6,300.00 126,000.00

126,000.00
12,600.00
138,600.00

252,000.00
cm 6,300.00 252,000.00

252,000.00
25,200.00
277,200.00

105,862.82
m2 110,740.67 10,298.88
m2 164,450.00 15,293.85
m2 169,813.21 15,792.63
m2 693,306.01 64,477.46
LS 13,940.64 13,940.64 13,940.64
cm 4,725.00 189,000.00 189,000.00

308,803.46
30,880.35
339,683.00

105,000.00
cm 2,625.00 105,000.00

105,000.00
10,500.00
115,500.00
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

Lot 187,126.40 187,126.40 187,126.40

187,126.40
18,712.64
205,839.00

Lot 989,564.95 989,564.95 989,564.95

989,564.95
98,956.50
1,088,521.00

96,485.60
m2 110,740.67 13,288.88
m2 693,306.01 83,196.72

LS 55,762.56 55,762.56 55,762.56

152,248.16
15,224.82
167,472.00

179,682.32
m2 110,740.67 13,288.88
m2 693,306.01 166,393.44

LS 111,525.12 111,525.12 111,525.12

291,207.44
29,120.74
320,328.00

Lot 231,066.11 231,066.11 231,066.11


H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

231,066.11
23,106.61
254,172.00

264,712.57
m1 271,958.56 1,514,809.15
m1 95,909.11 191,818.21
m2 303,726.50 72,894.36

Lot 111,525.12 111,525.12 111,525.12

lobang 102,080.00 102,080.00 102,080.00

478,317.69
47,831.77
526,149.00

128,647.47
m2 110,740.67 17,718.51
m2 693,306.01 110,928.96

LS 74,350.08 74,350.08 74,350.08

202,997.55
20,299.75
223,297.00
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

27,731.55
m2 396,165.00 27,731.55

Lot 48,792.24 48,792.24 48,792.24

76,523.79
7,652.38
84,176.00

47,539.80
m2 396,165.00 47,539.80

Lot 83,643.84 83,643.84 83,643.84

131,183.64
13,118.36
144,302.00

40,202.33
m2 110,740.67 5,537.03
m2 693,306.01 34,665.30

LS 23,234.40 23,234.40 23,234.40

63,436.73
6,343.67
69,780.00

96,485.60
m2 110,740.67 13,288.88
m2 693,306.01 83,196.72

LS 55,762.56 55,762.56 55,762.56

152,248.16
15,224.82
H. SATUAN BAHAN TOTAL
SATUAN Rp Rp Rp

5 6 7 9

167,472.00

264,712.57
m1 95,909.11 191,818.21
m2 303,726.50 72,894.36

Lot 111,525.12 111,525.12 111,525.12

lobang 102,080.00 102,080.00 102,080.00

478,317.69
47,831.77
526,149.00

239,576.43
m2 110,740.67 17,718.51
m2 693,306.01 221,857.92

LS 148,700.16 148,700.16 148,700.16

388,276.59
38,827.66
427,104.00

324,881.87
m2 110,740.67 16,611.10
m2 164,450.00 49,335.00
m2 169,813.21 50,943.96
m2 693,306.01 207,991.80
LS 139,406.40 139,406.40 139,406.40

464,288.27
46,428.83
510,717.00
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN
NO. URAIAN

1 2 3 4
S PEKERJAAN RAK SEPEDA

1 1 Unit Rak sepeda per segmet isi 10 sepeda


1. Bahan : Pipa BSP Ø 2 1/2" 6.424 m1
Baja Siku 50x50x5mm 146.520 kg
Plat baja t=6mm 47.100 m1
Dynabolt 16mm 4.000 bh
Mur baut 12 mm 40.000 bh
Kawat las 1.500 kg
2. Upah : Upah pembuatan & pemasangan
Kepala Tukang 0.102 hari
Tukang Las 1.020 hari
Pekerja 1.020 hari
Mandor 0.051 hari

3. Finishing cat duco 12.744


1 1 Unit Rak sepeda per segmet isi 10 sepeda

analisa Rak Sepeda / PAGE - 615


HARGA STUAN SUB. JUMLAH JUMLAH
Rp. Rp. Rp.
5 6 7

83,399.22 535,756.61 10,212,515.25


61,904.58 9,070,258.65
- -
6,500.00 26,000.00
12,000.00 480,000.00
67,000.00 100,500.00
146,931.00
67,000.00 6,834.00
67,000.00 68,340.00
67,000.00 68,340.00
67,000.00 3,417.00

Jumlah 10,359,446.25
Overhead & keuntungan 10% : 1,035,944.63
Jumlah : 11,395,390.88
258,160.00 3,289,988.56 3,289,988.56
Dibulatkan : 14,685,300.00

analisa Rak Sepeda / PAGE - 616