Anda di halaman 1dari 374

DAFTAR PENAMPANG + BOBOT TULANGAN

BATANG BULAT

UKURAN BERAT LUAS BERAT UKURAN BERAT LUAS BERAT


diameter (kg/m1) PEN. (cm2) (kg/lt) diameter (kg/m1) PEN. (cm2) (kg/lt)
5 mm 0.150 0.200 1.800 21 mm 2.720 3.460 32.640
6 mm 0.220 0.280 2.640 22 mm 2.980 3.800 35.760
7 mm 0.300 0.380 3.600 23 mm 3.260 4.150 39.120
8 mm 0.390 0.500 4.680 24 mm 3.550 4.520 42.600
9 mm 0.500 0.640 6.000 25 mm 3.850 4.910 46.200
10 mm 0.620 0.790 7.440
11 mm 0.750 0.950 9.000 26 mm 4.170 5.310 50.040
12 mm 0.890 1.130 10.680 27 mm 4.490 5.730 53.880
13 mm 1.040 1.330 12.480 28 mm 4.830 6.160 57.960
14 mm 1.210 1.540 14.520 29 mm 5.180 6.610 62.160
15 mm 1.390 1.770 16.680 30 mm 5.550 7.070 66.600
16 mm 1.580 2.010 18.960 31 mm 5.930 7.550 71.160
17 mm 1.780 2.270 21.360 32 mm 6.310 8.040 75.720
18 mm 2.000 2.540 24.000 33 mm 6.710 8.550 80.520
19 mm 2.230 2.840 26.760 34 mm 7.130 9.080 85.560
20 mm 2.460 3.140 29.520 35 mm 7.550 9.620 90.600

DAFTAR HARGA BESI BETON PENAMPANG BULAT


BULAN PEBRUARI TAHUN 2004

UKURAN BERAT BERAT HARGA HARGA


diameter (kg/m1) (kg/lt) /Btg (12 m') /Kg

8 mm 0.390 4.680 28,500 6,089.74


10 mm 0.620 7.440 42,000 5,645.16
12 mm 0.890 10.680 67,500 6,320.22
16 mm 1.580 18.960 102,500 5,406.12
19 mm 2.230 26.760 145,000 5,418.54

28,879.78
Harga rata-rata / kg 5,775.96 6,931.148
PERHITUNGAN KOEFISIEN TULANGAN BETON

Pondasi Strauz ø 30

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.2826 - 0.28 3.54 -
Tul. Pokok 6 10 1.00 0.62 3.720
Sengkang 5.00 8 0.57 0.39 1.102

Berat / m1 4.822
Berat / m3 U-24 17.063

Pondasi Poer 60x60x40

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.6 0.4 0.40 0.60 4.17 3.33
Tul. Pokok 4 12 1.00 0.89 3.560
Sengkang 6.67 12 2.00 0.89 11.867

Berat / m1 15.427
Berat / m3 U-24 64.278

Pondasi Telapak 70 x 70 x 25

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.7 0.25 0.25 0.70 5.71 2.86
Tul. Pokok 4 12 1.00 0.89 3.560
Sengkang 6.67 12 1.90 0.89 11.273

Berat / m1 14.833
Berat / m3 U-24 84.762
Pondasi Telapak 1,5 x 1,5 x 25

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1.5 0.25 0.25 1.50 2.67 1.33
Tul. Pokok 4 12 1.00 0.89 3.560
Sengkang 6.67 12 3.50 0.89 20.767

Berat / m1 24.327
Berat / m3 U-24 64.871

Sloof beton praktis 15/20 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.2 0.20 0.15 33.33 13.33
Tul. Pokok 4 10 1.00 0.62 2.480
Sengkang 5.00 8 0.70 0.39 1.365

Berat / m1 3.845
Berat / m3 U-24 128.167

Sloof beton praktis 15/25 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.25 0.25 0.15 26.67 13.33
Tul. Pokok 4 12 1.00 0.89 3.560
Sengkang 5.00 8 0.80 0.39 1.560

Berat / m1 5.120
Berat / m3 U-24 136.533

Sloof beton praktis 20/30 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.2 0.3 0.30 0.20 16.67 10.00
Tul. Pokok 4 12 1.00 0.89 3.560
Sengkang 5.00 8 1.00 0.39 1.950

Berat / m1 5.510
Berat / m3 U-24 91.833

Kolom 10/10 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.15 0.15 0.15 44.44 13.33
Tul. Pokok 4 10 1.00 0.62 2.480
Sengkang 5.00 8 0.60 0.39 1.170

Berat / m1 3.650
Berat / m3 U-24 162.222

Kolom 15/15 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.15 0.15 0.15 44.44 13.33
Tul. Pokok 4 10 1.00 0.62 2.480
Sengkang 5.00 6 0.60 0.22 0.660

Berat / m1 3.140
Berat / m3 U-24 139.556

Kolom 15/20 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.2 0.20 0.15 33.33 11.67
Tul. Pokok 4 12 1.00 0.89 3.560
Sengkang 5.00 8 0.70 0.39 1.365
Berat / m1 4.925
Berat / m3 U-24 164.167

Kolom 15/25 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.25 0.25 0.15 26.67 10.67
Tul. Pokok 4 14 1.00 1.21 4.840
Sengkang 5.00 8 0.80 0.39 1.560

Berat / m1 6.400
Berat / m3 U-24 170.667

Kolom 15/30 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.3 0.30 0.15 22.22 10.00
Tul. Pokok 4 13 1.00 1.04 4.160
Tul. Ekstra 0 12 1.00 0.89 -
Sengkang 5.00 8 0.90 0.39 1.755

Berat / m1 5.915
Berat / m3 U-24 131.444

Kolom 20/20 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.2 0.2 0.20 0.20 25.00 10.00
Tul. Pokok 4 14 1.00 1.21 4.840
Sengkang 5.00 10 0.80 0.62 2.480

Berat / m1 7.320
Berat / m3 U-24 183.000
Kolom 25/25 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.25 0.25 0.25 0.25 16.00 8.00
Tul. Pokok 4 14 1.00 1.21 4.840
Sengkang 5.00 10 1.00 0.62 3.100

Berat / m1 7.940
Berat / m3 U-24 127.040

Kolom 30/30 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.3 0.3 0.30 0.30 11.11 6.67
Tul. Pokok 4 16 1.00 1.58 6.320
Sengkang 5.00 8 1.20 0.39 2.340

Berat / m1 8.660
Berat / m3 U-24 96.222

Balok beton 10/10

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.1 0.1 0.10 0.10 100.00 30.00 100.00 0.10 10.00
Tul. Pokok 4 10 1.00 0.62 2.480
Sengkang 5.00 6 0.40 0.22 0.440

Berat / m1 2.920
Berat / m3 U-24 292.000
Balok beton 15/15

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.15 0.15 0.15 44.44 20.00 44.44 0.15 6.67
Tul. Pokok 4 10 1.00 0.62 2.480
Sengkang 5.00 6 0.60 0.22 0.660

Berat / m1 3.140
Berat / m3 U-24 139.556

Balok Beton 15/20

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.2 0.20 0.15 33.33 18.33 33.33 0.15 5.00
Tul. Pokok 4 12 1.00 0.89 3.560
Sengkang 5.00 8 0.70 0.39 1.365

Berat / m1 4.925
Berat / m3 U-39 164.167

Balok Beton 15/25

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.25 0.25 0.15 26.67 17.33 26.67 0.15 4.00
Tul. Pokok 4 13 1.00 1.04 4.160
Sengkang 5.00 8 0.80 0.39 1.560

Berat / m1 5.720
Berat / m3 U-39 152.533

Balok Beton 15/30

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.3 0.30 0.15 22.22 16.67 22.22 0.15 3.33
Tul. Pokok 4 13 1.00 1.04 4.160
Sengkang 5.00 8 0.90 0.39 1.755
Berat / m1 5.915
Berat / m3 U-39 131.444

Balok 20/35 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.2 0.35 0.35 0.20 14.29 12.86 14.29 0.20 2.86
Tul. Pokok 5 14 1.00 1.21 6.050
Tul. Ekstra 2 12 1.00 0.89 1.780
Sengkang 5.00 8 1.10 0.39 2.145

Berat / m1 9.975
Berat / m3 U-24 142.500

Balok 20/40 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.2 0.4 0.40 0.20 12.50 12.50 12.50 0.20 2.50
Tul. Pokok 5 14 1.00 0.39 1.950
Tul. Ekstra 2 12 1.00 0.89 1.780
Sengkang 5.00 8 1.20 0.22 1.320

Berat / m1 5.050
Berat / m3 U-24 63.125

Balok Beton 25/50

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.25 0.5 0.50 0.25 8.00 10.00 8.00 0.25 2.00
Tul. Pokok 10 16 1.00 1.58 15.800
Tul. Extra 2 12 1.00 0.89 1.780
Sengkang 5.00 10 1.50 0.62 4.650
Berat / m1 22.230
Berat / m3 U-39 177.840

Plat beton cantilever t=8 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 0.08 0.10 1.00 10.00 10.00 10.00 1.00 10.00
Tul. Pokok 8.00 8 1.00 0.39 3.120

Berat / m1 3.120
Berat / m3 U-24 39.000

Plat lantai beton t=12 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 0.12 0.12 1.00 8.33 8.33 8.33 1.00 8.33
Tul. Pokok 13.33 10 1.00 0.39 5.200
Tul. Pokok 13.33 10 1.00 0.39 5.200

Berat / m1 10.400
Berat / m3 U-24 86.667

Plat Penutup beton t=10 cm (Septictank)

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 0.12 0.12 1.00 8.33 8.33 8.33 1.00 8.33
Tul. Pokok 10.00 8 1.00 0.39 3.900
Tul. Pokok 8 1.00 0.39 -

Berat / m1 3.900
Berat / m3 U-24 32.500
Plat lantai beton Kantilever t=10 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 0.1 0.10 1.00 10.00 10.00 10.00 1.00 10.00
Tul. Pokok 13.33 8 1.00 0.39 5.200
Tul. Pokok 13.33 8 1.00 0.39 5.200

Berat / m1 10.400
Berat / m3 U-24 104.000

Plat lantai beton t = 15 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 0.15 0.15 1.00 6.67 6.67 6.67 1.00 6.67
Tul. Pokok 13.33 10 1.00 0.62 8.267
Tul. Pokok 13.33 10 1.00 0.62 8.267

Berat / m1 16.533
Berat / m3 U-24 110.222

Plat lantai beton Jembatan t=20 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 0.2 0.20 1.00 5.00 5.00 5.00 1.00 5.00
Tul. Pokok 13.33 10 1.00 0.62 8.267
Tul. Pokok 13.33 10 1.00 0.62 8.267

Berat / m1 16.533
Berat / m3 U-24 82.667

Ringbalok Beton 15/15

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.35 0.35 0.15 19.05 16.19 19.05 0.15 2.86
Tul. Pokok 4 10 1.00 0.62 2.480
Sengkang 5.00 8 1.00 0.39 1.950

Berat / m1 4.430
Berat / m3 U-24 84.381

Ringbalok Beton 15/25

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.3 0.30 0.15 22.22 16.67 22.22 0.15 3.33
Tul. Pokok 4 12 1.00 0.89 3.560
Sengkang 5.00 8 0.90 0.39 1.755

Berat / m1 5.315
Berat / m3 U-24 118.111

Ringbalok Beton 15/30

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.3 0.30 0.15 22.22 16.67 22.22 0.15 3.33
Tul. Pokok 4 14 1.00 1.21 4.840
Sengkang 5.00 8 0.90 0.39 1.755

Berat / m1 6.595
Berat / m3 U-24 146.556
1.715

1.715

1.715
1.715

1.715

1.715
1.715

22.23376
22.23376

22.23376

22.23376
22.23376
CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1 10.00 0.62


2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.19 13 14 1.21 3 16.00 1.58
4 5.7 0.20 14 16 1.58 4 19.00 2.23
5 6.0 0.22 15 19 2.23 5 22.00 2.98
6 6.5 0.31 16 22 2.98 6 25.00 3.85
7 8.0 0.40 17 23 3.26 7 29.00 5.19
8 9.0 0.53 18 25 3.85 8 32.00 6.31
9 10.0 0.62 19 28 4.83 9 36.00 7.99
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3

1. Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 c = ( 1 : 0.12 : 0.12 ) F = 69.44 m1
Besi 4 batang dia. 12 = 4 x 69,44 x 0,89 kg = 247.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg = 66.67 kg ( B )

BERAT BESI BETON UNTUK UKURAN 12 x 12 CM1 DALAM 1 M3 = 313.89 kg/m3 ( A + B )

2. Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 15 x 15 c = ( 1 : 0.15 : 0.15 ) = 44.44 m1
Besi 4 batang dia. 12 = 4 x 44,44 x 0,89 kg = 158.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg = 71.11 kg ( B )

BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 = 229.33 kg/m3 ( A + B )

3. Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 = ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg = 118.67 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x 0, 40 kg = 155.56 kg ( B )

BERAT BESI BETON UNTUK UKURAN 15 x 20 CM1 DALAM 1 M3 = 274.22 kg/m3 ( A + B )

4. Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 c = ( 1 : 0.20 : 0.30 ) = 16.67 m1
Besi 4 batang dia. 12 = 4 x 16,67 x 0,89 kg = 59.33 kg ( A)
Besi 2 batang dia. 10 = 2 x 16.67 x 0.62 kg = 73.57 kg ( B)
Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X 0,40 kg = 111.11 kg ( C )

BERAT BESI BETON UNTUK UKURAN 20 x 30 CM1 DALAM 1 M3 = 244.02 kg/m3 ( A + B + C )

Page 83 528975646.xls
HOME | silahkan pilih menu di bawah ini
SuperRAB V1.3
RENCANA ANGGARAN BIAYA (RAB)
Proyek :
Lokasi :

Harga Satuan Jumlah Harga


No No ID Pekerjaan Volume Satuan Bahan Upah Alat Subtotal Bahan Upah Alat Total
Rp Rp Rp Rp Rp Rp Rp Rp

A PEKERJAAN PONDASI
Pekerjaan Bowplank, Tanah & Pasangan Batu Kali
1 A1002 Pas.Bouwplank T.1,00M/m' 50.14 m' 22,390.50 13,366.67 - 35,757.17 1,122,659.67 670,204.67 - 1,792,864.34
2 A1008 Galian Tanah Keras Dalam Max 2,00M/m3 135.00 m3 - 92,351.10 562.50 92,913.60 - 12,467,398.50 75,937.50 12,543,336.00
3 A1004 Galian Tanah Lunak Dalam Max 1,50M/m3 13.06 m3 - 59,120.70 562.50 59,683.20 - 772,116.34 7,346.25 779,462.59
4 A1013 Pemadatan Tanah Pondasi/m2 (dgn Mesin Stamper) 135.00 m2 - 3,547.50 4,000.00 7,547.50 - 478,912.50 540,000.00 1,018,912.50
5 A1014 Urugan Pasir Urug/m3 3.38 m3 - 282,750.00 25,800.00 308,550.00 - 954,281.25 87,075.00 1,041,356.25
6 A1040 Pondasi Batu Kali 1:5/m3 27.01 m3 562,500.00 131,000.00 40,000.00 733,500.00 15,193,125.00 3,538,310.00 1,080,400.00 19,811,835.00
PONDASI POOR PLAT
7 A1025 Beton 1:2:3/m3,dgn Seplit 16.88 m3 673,125.00 108,800.00 145,000.00 926,925.00 11,358,984.38 1,836,000.00 2,446,875.00 15,641,859.38
8 A1063 Bekisting Pond.Plat Setempat/m2 2xpakai dgn Triplex 12mm 22.50 m2 158,097.15 24,007.50 - 182,104.65 3,557,185.88 540,168.75 - 4,097,354.63
9 B1016 Bekisting Kolom/m2 2xpakai dgn Triplex 9mm m2 89,650.50 29,100.00 - 118,750.50
10 B1013 Pembesian Polos/kg 91.83 kg 9,656.25 3,090.00 800.00 13,546.25 886,765.63 283,765.00 73,466.67 1,243,997.29

SUB TOTAL BIAYA PEKERJAAN PONDASI 32,118,720.55 21,541,157.01 4,311,100.42 57,970,977.97

B PEKERJAAN STRUKTUR
Pekerjaan Sloof
11 A1025 Beton 1:2:3/m3,dgn Seplit 6.91 m3 673,125.00 108,800.00 145,000.00 926,925.00 4,648,601.25 751,372.80 1,001,370.00 6,401,344.05
12 A1070 Bekisting Sloof/m2 2xpakai dgn Papan 2/20 69.06 m2 39,035.25 29,100.00 - 68,135.25 2,695,774.37 2,009,646.00 - 4,705,420.37
13 B1014 Pembesian Ulir/kg 634.20 kg 9,828.75 3,090.00 800.00 13,718.75 6,233,403.08 1,959,681.09 507,360.80 8,700,444.97

PEKERJAAN KOLOM
14 A1025 Beton 1:2:3/m3,dgn Seplit 19.50 m3 673,125.00 108,800.00 145,000.00 926,925.00 13,125,937.50 2,121,600.00 2,827,500.00 18,075,037.50
15 A1070 Bekisting Sloof/m2 2xpakai dgn Papan 2/20 130.00 m2 39,035.25 29,100.00 - 68,135.25 5,074,582.50 3,783,000.00 - 8,857,582.50
16 B1014 Pembesian Ulir/kg 1876.33 kg 9,828.75 3,090.00 800.00 13,718.75 18,442,011.25 5,797,870.00 1,501,066.67 25,740,947.92

PEKERJAAN BALOK
17 A1025 Beton 1:2:3/m3,dgn Seplit 13.06 m3 673,125.00 108,800.00 145,000.00 926,925.00 8,791,012.50 1,420,928.00 1,893,700.00 12,105,640.50
18 B1020 Bekisting Balok/m2 2xpakai dgn Triplex 12mm 163.25 m2 142,182.00 40,012.50 - 182,194.50 23,211,211.50 6,532,040.63 - 29,743,252.13
19 B1014 Pembesian Ulir/kg 824.41 kg 9,828.75 3,090.00 800.00 13,718.75 8,102,944.36 2,547,434.63 659,530.00 11,309,908.98

PEKERJAAN PLAT LANTAI


20 A1025 Beton 1:2:3/m3,dgn Seplit 27.18 m3 673,125.00 108,800.00 145,000.00 926,925.00 18,295,537.50 2,957,184.00 3,941,100.00 25,193,821.50
21 A1070 Bekisting Sloof/m2 2xpakai dgn Papan 2/20 181.20 m2 39,035.25 29,100.00 - 68,135.25 7,073,187.30 5,272,920.00 - 12,346,107.30
22 B1013 Pembesian Polos/kg 2995.84 kg 9,656.25 3,090.00 800.00 13,546.25 28,928,580.00 9,257,145.60 2,396,672.00 40,582,397.60

PEKERJAAN BALOK LT.2 (ROOF TOP)


23 A1025 Beton 1:2:3/m3,dgn Seplit 13.06 m3 673,125.00 108,800.00 145,000.00 926,925.00 8,791,012.50 1,420,928.00 1,893,700.00 12,105,640.50
24 B1020 Bekisting Balok/m2 2xpakai dgn Triplex 12mm 167.91 m2 142,182.00 40,012.50 - 182,194.50 23,874,388.97 6,718,670.36 - 30,593,059.33
25 B1013 Pembesian Polos/kg 1861.05 kg 9,656.25 3,090.00 800.00 13,546.25 17,970,764.06 5,750,644.50 1,488,840.00 25,210,248.56

SUB TOTAL BIAYA PEKERJAAN STRUKTUR 181,681,169.94 53,580,365.71 16,602,108.67 271,670,853.70

C PEKERJAAN PASANGAN DINDING


26 C1071 Pas.Celcon Blok Tebal 1/2 Batu T.7,5cm 1:3/m2 359.44 m2 72,865.88 20,400.00 4,921.25 98,187.13 26,190,910.11 7,332,576.00 1,768,894.10 35,292,380.21
27 F1002 Plesteran Bata 1:4/m2 T.1,52cm 718.88 m2 14,223.00 30,000.00 2,000.00 46,223.00 10,224,630.24 21,566,400.00 1,437,760.00 33,228,790.24

SUB TOTAL BIAYA PEKERJAAN PASANGAN DINDING - - - -

D PEKERJAAN BETON PRAKTIS

SUB TOTAL BIAYA PEKERJAAN BETON PRAKTIS - - - - - - - -

E PEKERJAAN RANGKA & PENUTUP ATAP

1 E1038 Rangka Atap Smartruss 179.82 m2 - - - 288,750.00 - - - 51,923,025.00


2 A1040 Pondasi Batu Kali 1:5/m3 m3 562,500.00 131,000.00 40,000.00 733,500.00
3 A1040 Pondasi Batu Kali 1:5/m3 m3 562,500.00 131,000.00 40,000.00 733,500.00
4 A1040 Pondasi Batu Kali 1:5/m3 m3 562,500.00 131,000.00 40,000.00 733,500.00
5 A1040 Pondasi Batu Kali 1:5/m3 m3 562,500.00 131,000.00 40,000.00 733,500.00
6 A1040 Pondasi Batu Kali 1:5/m3 m3 562,500.00 131,000.00 40,000.00 733,500.00
7 A1040 Pondasi Batu Kali 1:5/m3 m3 562,500.00 131,000.00 40,000.00 733,500.00
8 A1040 Pondasi Batu Kali 1:5/m3 m3 562,500.00 131,000.00 40,000.00 733,500.00
9 o1045 Pagar Pas.Bata Hebel t.10cm T.1,50M Per M1 13.67 m' - - - 1,009,687.42 - - - 13,802,426.98
SUB TOTAL BIAYA PEKERJAAN RANGKA & PENUTUP ATAP - - - 65,725,451.98

F PEKERJAAN PELAPIS DINDING


LANTAI 1

LANTAI 2

SUB TOTAL BIAYA PEKERJAAN PELAPIS DINDING - - - -

G PEKERJAAN PENUTUP PLAFOND


LANTAI 1

LANTAI 2

SUB TOTAL BIAYA PEKERJAAN PELAPIS DINDING - - - -

H PEKERJAAN PELAPIS LANTAI


LANTAI 1
LANTAI 2

SUB TOTAL BIAYA PEKERJAAN PELAPIS DINDING - - - -

I PEKERJAAN PINTU, JENDELA, KACA


LANTAI 1

LANTAI 2

SUB TOTAL BIAYA PEKERJAAN PINTU, JENDELA, KACA - - - -

J PEKERJAAN ENGSEL & KUNCI


LANTAI 1

LANTAI 2

SUB TOTAL BIAYA PEKERJAAN ENGSEL & KUNCI - - - -

K PEKERJAAN PENGECATAN
LANTAI 1
LANTAI 2

SUB TOTAL BIAYA PEKERJAAN PENGECATAN - - - -

L PEKERJAAN INSTALASI SANITASI


LANTAI 1
Air Bersih

Air Kotor

LANTAI 2
Air Bersih

Air Kotor

SUB TOTAL BIAYA PEKERJAAN INSTALASI SANITASI - - - -

M PEKERJAAN ACCESSORIES INSTALASI SANITAIR


LANTAI 1

1 M1002 Bath Tube Import/bh Type2 bh 38,122,580.00 598,500.00 - 38,721,080.00

LANTAI 2
SUB TOTAL BIAYA PEKERJAAN ACCESSORIES INSTALASI SANITAIR - - - -

N PEKERJAAN INSTALASI LISTRIK


LANTAI 1

1 N1010 Box Sikring/bh 4 Group bh 490,700.00 180,000.00 6,000.00 676,700.00

2 N1011 Box Sikring/bh 6 Group bh 736,050.00 216,000.00 3,000.00 955,050.00

SUB TOTAL BIAYA PEKERJAAN INSTALASI LISTRIK - - - -

O PEKERJAAN LUAR & HALAMAN

1 N1009 Box Sikring/bh 2 Group bh 245,350.00 144,000.00 3,000.00 392,350.00

SUB TOTAL BIAYA PEKERJAAN LUAR & HALAMAN - - - -

P PEKERJAAN LAIN-LAIN

SUB TOTAL BIAYA PEKERJAAN LAIN-LAIN - - -


Page 92 of 374

DAFTAR HARGA ALAT BANTU


Nama Barang Satuan Harga Satuan Kap.Prod Alat

Ember Aduk bh 10,000.00


Pacul Aduk bh 50,000.00
Blencong bh 70,000.00
Sekop bh 100,000.00
Pahat Besi bh 30,000.00
Timbrisan Tanah bh 100,000.00
Timbrisan Mesin/Stamper m3 200,000.00
Bar Cutter kg 400.00
Bar Binder kg 400.00
Bor Listrik hk 50,000.00
Pemotong Keramik m2 3,000.00
Compressor Cat hr 200,000.00
Concrete Mixer m3 250,000.00
Pompa Beton m3 200,000.00
Vibrator m3 100,000.00

BAHAN,UPAH&ALAT
Page 93 of 374

ANALISA HARGA SATUAN PEKERJAAN


ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.PONDASI
A1001 Pas.Bouwplank T.0,50M/m'
Bahan
Kaso 5/7 Borneo m3 0.0040 1,500,000.00 6,000.00
Papan 3/20 Borneo m3 0.0070 1,650,000.00 11,550.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 7cm kg 0.0120 12,750.00 153.00
Jumlah.a 17,890.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0333 81,000.00 2,700.00
Kep.Tukang ht 0.0111 108,000.00 1,200.00
Mandor ht 0.0037 126,000.00 466.67
Jumlah.b 13,366.67
Jumlah.a+b 31,257.17

A1002 Pas.Bouwplank T.1,00M/m'


Bahan
Kaso 5/7 Borneo m3 0.0070 1,500,000.00 10,500.00
Papan 3/20 Borneo m3 0.0070 1,650,000.00 11,550.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 7cm kg 0.0120 12,750.00 153.00
Jumlah.a 22,390.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu ht 0.0333 81,000.00 2,700.00
Kep.Tukang ht 0.0111 108,000.00 1,200.00
Mandor ht 0.0037 126,000.00 466.67
Jumlah.b 13,366.67
Jumlah.a+b 35,757.17

A1003 Galian Tanah Lunak Dalam Max 1,00M/m3


Upah
Tk.Gali ht 0.3666 99,000.00 36,293.40
Kep.Tukang ht 0.0733 108,000.00 7,918.56
Mandor ht 0.0244 126,000.00 3,079.44
Jumlah.a 47,291.40
Alat Bantu
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.b 562.50
Jumlah.a+b 47,853.90

A1004 Galian Tanah Lunak Dalam Max 1,50M/m3


Upah
Tk.Gali ht 0.4583 99,000.00 45,371.70
Kep.Tukang ht 0.0917 108,000.00 9,899.28
Mandor ht 0.0306 126,000.00 3,849.72
Jumlah.a 59,120.70
Alat Bantu
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.b 562.50
Jumlah.a+b 59,683.20

A1005 Galian Tanah Lunak Dalam Max 2,00M/m3


Upah
Tk.Gali ht 0.5728 99,000.00 56,707.20
Kep.Tukang ht 0.1146 108,000.00 12,372.48
Mandor ht 0.0382 126,000.00 4,811.52
Jumlah.a 73,891.20
Alat Bantu
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.b 562.50
Jumlah.a+b 74,453.70

A1006 Galian Tanah Keras Dalam Max 1,00M/m3


Upah
Tk.Gali ht 0.4583 99,000.00 45,371.70
Kep.Tukang ht 0.0917 108,000.00 9,899.28
Mandor ht 0.0306 126,000.00 3,849.72
Jumlah.a 59,120.70

528975646.xls
Page 94 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.b 562.50
Jumlah.a+b 59,683.20

A1007 Galian Tanah Keras Dalam Max 1,50M/m3


Upah
Tk.Gali ht 0.5728 99,000.00 56,707.20
Kep.Tukang ht 0.1146 108,000.00 12,372.48
Mandor ht 0.0382 126,000.00 4,811.52
Jumlah.a 73,891.20
Alat Bantu
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.b 562.50
Jumlah.a+b 74,453.70

A1008 Galian Tanah Keras Dalam Max 2,00M/m3


Upah
Tk.Gali ht 0.7159 99,000.00 70,874.10
Kep.Tukang ht 0.1432 108,000.00 15,463.44
Mandor ht 0.0477 126,000.00 6,013.56
Jumlah.a 92,351.10
Alat Bantu
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.b 562.50
Jumlah.a+b 92,913.60

A1009 Galian Tanah Ex.Dipadatkan Dalam Max 1,00M/m3


Upah
Tk.Gali ht 0.5728 99,000.00 56,707.20
Kep.Tukang ht 0.1146 108,000.00 12,372.48
Mandor ht 0.0382 126,000.00 4,811.52
Jumlah.a 73,891.20
Alat Bantu
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.b 562.50
Jumlah.a+b 74,453.70

A1010 Galian Tanah Ex.Dipadatkan Dalam Max 1,50M/m3


Upah
Tk.Gali ht 0.7159 99,000.00 70,874.10
Kep.Tukang ht 0.1432 108,000.00 15,463.44
Mandor ht 0.0477 126,000.00 6,013.56
Jumlah.a 92,351.10
Alat Bantu
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.b 562.50
Jumlah.a+b 92,913.60

A1011 Galian Tanah Ex.Dipadatkan Dalam Max 2,00M/m3


Upah
Tk.Gali ht 0.8949 99,000.00 88,595.10
Kep.Tukang ht 0.1790 108,000.00 19,329.84
Mandor ht 0.0597 126,000.00 7,517.16
Jumlah.a 115,442.10
Alat Bantu
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.b 562.50
Jumlah.a+b 116,004.60

A1012 Pemadatan Tanah Pondasi/m2 (dgn Timbrisan Manual)


Upah
Tk.Gali ht 0.0220 99,000.00 2,178.00
Kep.Tukang ht 0.0044 108,000.00 475.20
Mandor ht 0.0015 126,000.00 184.80
Jumlah.a 2,838.00
Alat Bantu
Timbrisan Tanah bh 0.0200 100,000.00 2,000.00
Jumlah.b 2,000.00
Jumlah.a+b 4,838.00

528975646.xls
Page 95 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

A1013 Pemadatan Tanah Pondasi/m2 (dgn Mesin Stamper)


Upah
Tk.Gali ht 0.0275 99,000.00 2,722.50
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.a 3,547.50
Alat Bantu
Mesin Stamper bh 0.0200 200,000.00 4,000.00
Jumlah.b 4,000.00
Jumlah.a+b 7,547.50

A1014 Urugan Pasir Urug/m3


Bahan
Pasir Urug Darat m3 1.3000 217,500.00 282,750.00
Jumlah.a 282,750.00
Upah
Tk.Gali Ht 0.2000 99,000.00 19,800.00
Kep.Tukang Ht 0.0400 108,000.00 4,320.00
Mandor Ht 0.0133 126,000.00 1,680.00
Jumlah.b 25,800.00
Jumlah.a+b 308,550.00

A1015 Urugan Pasir Extra Beton/m3


Bahan
Pasir Extra Beton m3 1.2500 240,000.00 300,000.00
Jumlah.a 300,000.00
Upah
Tk.Gali Ht 0.2000 99,000.00 19,800.00
Kep.Tukang Ht 0.0400 108,000.00 4,320.00
Mandor Ht 0.0133 126,000.00 1,680.00
Jumlah.b 25,800.00
Jumlah.a+b 325,800.00

A1016 Urugan Sirtu/m3


Bahan
Sirtu m3 1.2000 187,500.00 225,000.00
Jumlah.a 225,000.00
Upah
Tk.Gali Ht 0.2500 99,000.00 24,750.00
Kep.Tukang Ht 0.0500 108,000.00 5,400.00
Mandor Ht 0.0167 126,000.00 2,100.00
Jumlah.b 32,250.00
Jumlah.a+b 257,250.00

A1017 Spesi 1:3/m3


Bahan
Semen sak 7.0000 52,500.00 367,500.00
Pasir Beton m3 1.2500 255,000.00 318,750.00
Jumlah 686,250.00

A1018 Spesi 1:4/m3


Bahan
Semen sak 6.0000 52,500.00 315,000.00
Pasir Beton m3 1.3000 255,000.00 331,500.00
Jumlah 646,500.00

A1019 Spesi 1:5/m3


Bahan
Semen sak 5.2000 52,500.00 273,000.00
Pasir Beton m3 1.3500 255,000.00 344,250.00
Jumlah 617,250.00

A1020 Spesi 1:6/m3


Bahan
Semen sak 4.4000 52,500.00 231,000.00
Pasir Beton m3 1.4000 255,000.00 357,000.00
Jumlah 588,000.00

528975646.xls
Page 96 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

A1021 Beton 1:1,5:2,5/m3,dgn Koral


Bahan
Semen sak 7.2000 52,500.00 378,000.00
Pasir Beton m3 0.5500 255,000.00 140,250.00
Koral Beton m3 0.8000 225,000.00 180,000.00
Jumlah.a 698,250.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 952,050.00

A1022 Beton 1:2:3/m3,dgn Koral


Bahan
Semen sak 6.4000 52,500.00 336,000.00
Pasir Beton m3 0.5500 255,000.00 140,250.00
Koral Beton m3 0.7500 225,000.00 168,750.00
Jumlah.a 645,000.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 898,800.00

A1023 Beton 1:3:5/m3,dgn Koral


Bahan
Semen sak 4.8000 52,500.00 252,000.00
Pasir Beton m3 0.6500 255,000.00 165,750.00
Koral Beton m3 0.9000 225,000.00 202,500.00
Jumlah.a 620,250.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 874,050.00

A1024 Beton 1:1,5:2,5/m3,dgn Seplit


Bahan
Semen sak 7.2000 52,500.00 378,000.00
Pasir Beton m3 0.5500 255,000.00 140,250.00
Seplit 2X3 m3 0.8000 262,500.00 210,000.00
Jumlah.a 728,250.00

528975646.xls
Page 97 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
145,000.00
982,050.00

A1025 Beton 1:2:3/m3,dgn Seplit


Bahan
Semen sak 6.4000 52,500.00 336,000.00
Pasir Beton m3 0.5500 255,000.00 140,250.00
Seplit 2X3 m3 0.7500 262,500.00 196,875.00
Jumlah.a 673,125.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 926,925.00

A1026 Beton 1:3:5/m3,dgn Seplit


Bahan
Semen sak 4.8000 52,500.00 252,000.00
Pasir Beton m3 0.6500 255,000.00 165,750.00
Seplit 2X3 m3 0.9000 262,500.00 236,250.00
Jumlah.a 654,000.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 907,800.00

A1027 Beton Ready Mix K.250/m3


Bahan
Beton K.250 m3 1.0300 767,250.00 790,267.50
Jumlah.a 790,267.50
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00

528975646.xls
Page 98 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,163,267.50

A1028 Beton Ready Mix K.225/m3


Bahan
Beton K.225 m3 1.0300 742,500.00 764,775.00
Jumlah.a 764,775.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,137,775.00

A1029 Beton Ready Mix K.200/m3


Bahan
Beton K.200 m3 1.0300 729,300.00 751,179.00
Jumlah.a 751,179.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,124,179.00

A1030 Beton Ready Mix K.175/m3


Bahan
Beton K.175 m3 1.0300 717,750.00 739,282.50
Jumlah.a 739,282.50
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,112,282.50

A1031 Beton Ready Mix K.150/m3


Bahan
Beton K.150 m3 1.0300 694,500.00 715,335.00
Jumlah.a 715,335.00

528975646.xls
Page 99 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,088,335.00

A1032 Beton Ready Mix K.125/m3


Bahan
Beton K.125 m3 1.0300 676,500.00 696,795.00
Jumlah.a 696,795.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,069,795.00

A1033 Beton Lantai Kerja T.2,5cm/m2 dgn Koral


Bahan+Upah+Alat
Beton Site Mix 1Pc:3Psr:5Krl m3 0.0275 874,050.00 24,036.38

A1034 Beton Lantai Kerja T.5cm/m2 dgn Koral


Bahan+Upah+Alat
Beton Site Mix 1Pc:3Psr:5Krl m3 0.0550 874,050.00 48,072.75

A1035 Beton Lantai Kerja T.7,5cm/m2 dgn Koral


Bahan+Upah+Alat
Beton Site Mix 1Pc:3Psr:5Krl m3 0.0825 874,050.00 72,109.13

A1036 Beton Lantai Kerja T.2,5cm/m2 dgn Seplit


Bahan+Upah+Alat
Beton Site Mix 1Pc:3Psr:5Spl m3 0.0275 907,800.00 24,964.50

A1037 Beton Lantai Kerja T.5cm/m2 dgn Seplit


Bahan+Upah+Alat
Beton Site Mix 1Pc:3Psr:5Spl m3 0.0550 907,800.00 49,929.00

A1038 Beton Lantai Kerja T.7,5cm/m2 dgn Seplit


Bahan+Upah+Alat
Beton Site Mix 1Pc:3Psr:5Spl m3 0.0825 907,800.00 74,893.50

A1039 Pondasi Batu Kali 1:4/m3


Bahan
Batu Kali/Belah m3 1.2500 225,000.00 281,250.00
Spesi 1:4 m3 0.4500 646,500.00 290,925.00
Bambu Profil btg 0.2500 11,250.00 2,812.50
Kawat Beton kg 0.0100 11,250.00 112.50
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.a 575,662.50
Upah Pasang
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Kasar ht 0.3333 108,000.00 36,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 131,000.00

528975646.xls
Page 100 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 1.0000 10,000.00 10,000.00
Pacul bh 0.2000 50,000.00 10,000.00
Sekop bh 0.2000 100,000.00 20,000.00
Jumlah.c 40,000.00
Jumlah.a+b+c 746,662.50

A1040 Pondasi Batu Kali 1:5/m3


Bahan
Batu Kali/Belah m3 1.2500 225,000.00 281,250.00
Spesi 1:5 m3 0.4500 617,250.00 277,762.50
Bambu Profil btg 0.2500 11,250.00 2,812.50
Kawat Beton kg 0.0100 11,250.00 112.50
Benang Rami glg 0.1500 3,750.00 562.50
Jumlah.a 562,500.00
Upah Pasang
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Kasar ht 0.3333 108,000.00 36,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 131,000.00
Alat Bantu
Ember bh 1.0000 10,000.00 10,000.00
Pacul bh 0.2000 50,000.00 10,000.00
Sekop bh 0.2000 100,000.00 20,000.00
Jumlah.c 40,000.00
Jumlah.a+b+c 733,500.00

A1041 Pas.Rollag Bataco Semen 1:4/m3


Bahan
Bataco Semen bh 127.9080 2,250.00 287,793.00
Spesi 1:4 m3 0.1433 646,500.00 92,643.45
Jumlah.a 380,436.45
Upah Pasang
Kenek ht 1.3954 90,000.00 125,586.00
Tk.Batu Kasar ht 0.4651 108,000.00 50,234.40
Kep.Tukang ht 0.0930 108,000.00 10,046.88
Mandor ht 0.0310 126,000.00 3,907.12
Jumlah.b 189,774.40
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5488 3,750.00 2,058.00
Ember bh 0.1860 10,000.00 1,860.00
Pacul bh 0.0930 50,000.00 4,650.00
Sekop bh 0.0930 100,000.00 9,300.00
Jumlah.c 20,680.50
Jumlah.a+b+c 590,891.35

A1042 Pas.Rollag Bataco Semen 1:5/m3


Bahan
Bataco Semen bh 127.9080 2,250.00 287,793.00
Spesi 1:5 m3 0.1433 617,250.00 88,451.93
Jumlah.a 376,244.93
Upah Pasang
Kenek ht 1.3954 90,000.00 125,586.00
Tk.Batu Kasar ht 0.4651 108,000.00 50,234.40
Kep.Tukang ht 0.0930 108,000.00 10,046.88
Mandor ht 0.0310 126,000.00 3,907.12
Jumlah.b 189,774.40
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5488 3,750.00 2,058.00
Ember bh 0.1860 10,000.00 1,860.00
Pacul bh 0.0930 50,000.00 4,650.00
Sekop bh 0.0930 100,000.00 9,300.00
Jumlah.c 20,680.50
Jumlah.a+b+c 586,699.83

A1043 Pas.Rollag Batu Bata Kampung 1:4/m3


Bahan
Batu Bata Kampung bh 791.4858 300.00 237,445.74
Spesi 1:4 m3 0.3489 646,500.00 225,563.85
Jumlah.a 463,009.59

528975646.xls
Page 101 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 1.2766 90,000.00 114,894.00
Tk.Batu Kasar ht 0.4255 108,000.00 45,957.60
Kep.Tukang ht 0.0851 108,000.00 9,191.52
Mandor ht 0.0284 126,000.00 3,574.48
Jumlah.b 173,617.60
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5021 3,750.00 1,882.88
Ember bh 0.1702 10,000.00 1,702.00
Pacul bh 0.0851 50,000.00 4,255.00
Sekop bh 0.0851 100,000.00 8,510.00
Jumlah.c 19,162.38
Jumlah.a+b+c 655,789.57

A1044 Pas.Rollag Batu Bata Kampung 1:5/m3


Bahan
Batu Bata Kampung bh 791.4858 300.00 237,445.74
Spesi 1:5 m3 0.3489 617,250.00 215,358.53
Jumlah.a 452,804.27
Upah Pasang
Kenek ht 1.2766 90,000.00 114,894.00
Tk.Batu Kasar ht 0.4255 108,000.00 45,957.60
Kep.Tukang ht 0.0851 108,000.00 9,191.52
Mandor ht 0.0284 126,000.00 3,574.48
Jumlah.b 173,617.60
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5021 3,750.00 1,882.88
Ember bh 0.1702 10,000.00 1,702.00
Pacul bh 0.0851 50,000.00 4,255.00
Sekop bh 0.0851 100,000.00 8,510.00
Jumlah.c 19,162.38
Jumlah.a+b+c 645,584.24

A1045 Pas.Rollag Batu Bata Kuo Shin 1:4/m3


Bahan
Batu Bata Kuo Shin bh 639.2814 600.00 383,568.84
Spesi 1:4 m3 0.2783 646,500.00 179,920.95
Jumlah.a 563,489.79
Upah Pasang
Kenek ht 1.2766 90,000.00 114,894.00
Tk.Batu Kasar ht 0.4255 108,000.00 45,957.60
Kep.Tukang ht 0.0851 108,000.00 9,191.52
Mandor ht 0.0284 126,000.00 3,574.48
Jumlah.b 173,617.60
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5021 3,750.00 1,882.88
Ember bh 0.1702 10,000.00 1,702.00
Pacul bh 0.0851 50,000.00 4,255.00
Sekop bh 0.0851 100,000.00 8,510.00
Jumlah.c 19,162.38
Jumlah.a+b+c 756,269.77

A1046 Pas.Rollag Batu Bata Kuo Shin 1:5/m3


Bahan
Batu Bata Kuo Shin bh 639.2814 600.00 383,568.84
Spesi 1:5 m3 0.2783 617,250.00 171,780.68
Jumlah.a 555,349.52
Upah Pasang
Kenek ht 1.2766 90,000.00 114,894.00
Tk.Batu Kasar ht 0.4255 108,000.00 45,957.60
Kep.Tukang ht 0.0851 108,000.00 9,191.52
Mandor ht 0.0284 126,000.00 3,574.48
Jumlah.b 173,617.60

528975646.xls
Page 102 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5021 3,750.00 1,882.88
Ember bh 0.1702 10,000.00 1,702.00
Pacul bh 0.0851 50,000.00 4,255.00
Sekop bh 0.0851 100,000.00 8,510.00
Jumlah.c 19,162.38
Jumlah.a+b+c 748,129.49

A1047 Pas.Rollag Batu Bata Press 1:4/m3


Bahan
Batu Bata Press bh 638.2950 525.00 335,104.88
Spesi 1:4 m3 0.3191 646,500.00 206,298.15
Jumlah.a 541,403.03
Upah Pasang
Kenek ht 1.2766 90,000.00 114,894.00
Tk.Batu Kasar ht 0.4255 108,000.00 45,957.60
Kep.Tukang ht 0.0851 108,000.00 9,191.52
Mandor ht 0.0284 126,000.00 3,574.48
Jumlah.b 173,617.60
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5021 3,750.00 1,882.88
Ember bh 0.1702 10,000.00 1,702.00
Pacul bh 0.0851 50,000.00 4,255.00
Sekop bh 0.0851 100,000.00 8,510.00
Jumlah.c 19,162.38
Jumlah.a+b+c 734,183.00

A1048 Pas.Rollag Batu Bata Press 1:5/m3


Bahan
Batu Bata Press bh 638.2950 525.00 335,104.88
Spesi 1:5 m3 0.3191 617,250.00 196,964.48
Jumlah.a 532,069.35
Upah Pasang
Kenek ht 1.2766 90,000.00 114,894.00
Tk.Batu Kasar ht 0.4255 108,000.00 45,957.60
Kep.Tukang ht 0.0851 108,000.00 9,191.52
Mandor ht 0.0284 126,000.00 3,574.48
Jumlah.b 173,617.60
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5021 3,750.00 1,882.88
Ember bh 0.1702 10,000.00 1,702.00
Pacul bh 0.0851 50,000.00 4,255.00
Sekop bh 0.0851 100,000.00 8,510.00
Jumlah.c 19,162.38
Jumlah.a+b+c 724,849.33

A1049 Pas.Rollag Celcon Blok T.10cm 1:4/m3


Bahan
Celcon Blok T.10cm bh 79.0704 10,500.00 830,239.20
Spesi 1:4 m3 0.1433 646,500.00 92,643.45
Jumlah.a 922,882.65
Upah Pasang
Kenek ht 1.3954 90,000.00 125,586.00
Tk.Batu Kasar ht 0.4651 108,000.00 50,234.40
Kep.Tukang ht 0.0930 108,000.00 10,046.88
Mandor ht 0.0310 126,000.00 3,907.12
Jumlah.b 189,774.40
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5488 3,750.00 2,058.00
Ember bh 0.1860 10,000.00 1,860.00
Pacul bh 0.0930 50,000.00 4,650.00
Sekop bh 0.0930 100,000.00 9,300.00
Jumlah.c 20,680.50
Jumlah.a+b+c 1,133,337.55

528975646.xls
Page 103 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

A1050 Pas.Rollag Celcon Blok T.10cm 1:5/m3


Bahan
Celcon Blok T.10cm bh 79.0704 10,500.00 830,239.20
Spesi 1:5 m3 0.1433 617,250.00 88,451.93
Jumlah.a 918,691.13
Upah Pasang
Kenek ht 1.3954 90,000.00 125,586.00
Tk.Batu Kasar ht 0.4651 108,000.00 50,234.40
Kep.Tukang ht 0.0930 108,000.00 10,046.88
Mandor ht 0.0310 126,000.00 3,907.12
Jumlah.b 189,774.40
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.5488 3,750.00 2,058.00
Ember bh 0.1860 10,000.00 1,860.00
Pacul bh 0.0930 50,000.00 4,650.00
Sekop bh 0.0930 100,000.00 9,300.00
Jumlah.c 20,680.50
Jumlah.a+b+c 1,129,146.03

A1051 Pas.Rollag Celcon Blok T.7,5cm 1:4/m3


Bahan
Celcon Blok T.7,5cm bh 103.0302 7,800.00 803,635.56
Spesi 1:4 m3 0.1394 646,500.00 90,122.10
Jumlah.a 893,757.66
Upah Pasang
Kenek ht 1.8182 90,000.00 163,638.00
Tk.Batu Kasar ht 0.6061 108,000.00 65,455.20
Kep.Tukang ht 0.1212 108,000.00 13,091.04
Mandor ht 0.0404 126,000.00 5,090.96
Jumlah.b 247,275.20
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.7152 3,750.00 2,682.00
Ember bh 0.2424 10,000.00 2,424.00
Pacul bh 0.1212 50,000.00 6,060.00
Sekop bh 0.1212 100,000.00 12,120.00
Jumlah.c 26,098.50
Jumlah.a+b+c 1,167,131.36

A1052 Pas.Rollag Celcon Blok T.7,5cm 1:5/m3


Bahan
Celcon Blok T.7,5cm bh 103.0302 7,800.00 803,635.56
Spesi 1:5 m3 0.1394 617,250.00 86,044.65
Jumlah.a 889,680.21
Upah Pasang
Kenek ht 1.8182 90,000.00 163,638.00
Tk.Batu Kasar ht 0.6061 108,000.00 65,455.20
Kep.Tukang ht 0.1212 108,000.00 13,091.04
Mandor ht 0.0404 126,000.00 5,090.96
Jumlah.b 247,275.20
Alat Bantu
Bambu Profil btg 0.2500 11,250.00 2,812.50
Benang Rami m3 0.7152 3,750.00 2,682.00
Ember bh 0.2424 10,000.00 2,424.00
Pacul bh 0.1212 50,000.00 6,060.00
Sekop bh 0.1212 100,000.00 12,120.00
Jumlah.c 26,098.50
Jumlah.a+b+c 1,163,053.91

A1053 Pembesian Polos/kg


Bahan
Besi Polos kg 1.1500 8,250.00 9,487.50
Kawat Beton kg 0.0150 11,250.00 168.75
Jumlah.a 9,656.25
Upah Buat & Pasang
Kenek ht 0.0200 90,000.00 1,800.00
Tk.Besi ht 0.0100 99,000.00 990.00
Kep.Tukang ht 0.0020 108,000.00 216.00
Mandor ht 0.0007 126,000.00 84.00
Jumlah.b 3,090.00

528975646.xls
Page 104 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Bar Cutter kg 1.0000 400.00 400.00
Bar Binder kg 1.0000 400.00 400.00
Jumlah.c 800.00
Jumlah.a+b+c 13,546.25

A1054 Pembesian Ulir/kg


Bahan
Besi Ulir kg 1.1500 8,400.00 9,660.00
Kawat Beton kg 0.0150 11,250.00 168.75
Jumlah.a 9,828.75
Upah Buat & Pasang
Kenek ht 0.0200 90,000.00 1,800.00
Tk.Besi ht 0.0100 99,000.00 990.00
Kep.Tukang ht 0.0020 108,000.00 216.00
Mandor ht 0.0007 126,000.00 84.00
Jumlah.b 3,090.00
Alat Bantu
Bar Cutter kg 1.0000 400.00 400.00
Bar Binder kg 1.0000 400.00 400.00
Jumlah.c 800.00
Jumlah.a+b+c 13,718.75

A1055 Besi Angkur Sloof dia 10mm50cm/bh Polos


Bahan+Upah+Alat
Pembesian dia 10mm kg 0.3085 13,546.25 4,179.02

A1056 Besi Angkur Sloof dia 12mm50cm/bh Polos


Bahan+Upah+Alat
Pembesian dia 12mm kg 0.4440 13,546.25 6,014.54

A1057 Besi Angkur Sloof dia 16mm50cm/bh Polos


Bahan+Upah+Alat
Pembesian dia 16mm kg 0.7890 13,546.25 10,687.99

A1058 Besi Angkur Sloof dia 10mm50cm/bh Ulir


Bahan+Upah+Alat
Pembesian dia 10mm kg 0.3085 13,718.75 4,232.23

A1059 Besi Angkur Sloof dia 12mm50cm/bh Ulir


Bahan+Upah+Alat
Pembesian dia 12mm kg 0.4440 13,718.75 6,091.13

A1060 Besi Angkur Sloof dia 16mm50cm/bh Ulir


Bahan+Upah+Alat
Pembesian dia 16mm kg 0.7890 13,718.75 10,824.09

A1061 Bekisting Pond.Plat Setempat/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi 2x20 m3 0.0156 1,650,000.00 25,740.00
Kaso Stut 4x6 m3 0.0250 1,500,000.00 37,500.00
Kaso Skur 4x6 m3 0.0125 1,500,000.00 18,750.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1466 12,750.00 1,869.15
Paku 7cm kg 0.4400 11,250.00 4,950.00
Jumlah.a 88,996.65
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 110,821.65

528975646.xls
Page 105 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

A1062 Bekisting Pond.Plat Setempat/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi 9mm lbr 0.2066 135,000.00 27,891.00
Kaso Pengaku 4x6cm m3 0.0375 1,500,000.00 56,250.00
Kaso Stut 4x6cm m3 0.0250 1,500,000.00 37,500.00
Kaso Skur 4x6cm m3 0.0125 1,500,000.00 18,750.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.2566 12,750.00 3,271.65
Paku 7cm kg 0.4400 11,250.00 4,950.00
Jumlah.a 148,800.15
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 170,625.15

A1063 Bekisting Pond.Plat Setempat/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi 12mm lbr 0.2066 180,000.00 37,188.00
Kaso Pengaku 4x6cm m3 0.0375 1,500,000.00 56,250.00
Kaso Sktut 4x6cm m3 0.0250 1,500,000.00 37,500.00
Kaso Skur 4x6cm m3 0.0125 1,500,000.00 18,750.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.2566 12,750.00 3,271.65
Paku 10cm kg 0.4400 11,250.00 4,950.00
Jumlah.a 158,097.15
Upah
Kenek ht 0.1650 90,000.00 14,850.00
Tk.Kayu Kasar ht 0.0825 81,000.00 6,682.50
Kep.Tukang ht 0.0165 108,000.00 1,782.00
Mandor ht 0.0055 126,000.00 693.00
Jumlah.b 24,007.50
Jumlah.a+b 182,104.65

A1064 Bekisting Pond.Plat Jalur/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi 2x20 m3 0.0156 1,650,000.00 25,740.00
Kaso Stut 4x6cm m3 0.0056 1,500,000.00 8,400.00
Kaso Skur 4x6cm m3 0.0063 1,500,000.00 9,450.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1466 12,750.00 1,869.15
Paku 7cm kg 0.4400 11,250.00 4,950.00
Jumlah.a 50,596.65
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 72,421.65

A1065 Bekisting Pond.Plat Jalur/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi lbr 0.2278 135,000.00 30,753.00
Kaso Klam 4x6 m3 0.0286 1,500,000.00 42,900.00
Kaso Stut 5x7 m3 0.0291 1,500,000.00 43,650.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.4106 12,750.00 5,235.15
Paku 10cm kg 0.2200 11,250.00 2,475.00
Jumlah.a 125,200.65
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 147,025.65

528975646.xls
Page 106 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

A1066 Bekisting Pond.Plat Jalur/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi lbr 0.2278 180,000.00 41,004.00
Kaso Klam 4x6 m3 0.0286 1,500,000.00 42,900.00
Kaso Stut 5x7 m3 0.0291 1,500,000.00 43,650.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.4106 12,750.00 5,235.15
Paku 10cm kg 0.2200 11,250.00 2,475.00
Jumlah.a 135,451.65
Upah
Kenek ht 0.1650 90,000.00 14,850.00
Tk.Kayu Kasar ht 0.0825 81,000.00 6,682.50
Kep.Tukang ht 0.0165 108,000.00 1,782.00
Mandor ht 0.0055 126,000.00 693.00
Jumlah.b 24,007.50
Jumlah.a+b 159,459.15

A1067 Bekisting Poer/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi 2x20 m3 0.0156 1,650,000.00 25,740.00
Kaso Klam 4x6 m3 0.0100 1,500,000.00 15,000.00
Kaso Stut 5x7 m3 0.0181 1,500,000.00 27,150.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.2933 12,750.00 3,739.58
Paku 10cm kg 0.2200 11,250.00 2,475.00
Jumlah.a 74,292.08
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 96,117.08

A1068 Bekisting Poer/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi lbr 0.2278 135,000.00 30,753.00
Kaso Klam 4x6 m3 0.0286 1,500,000.00 42,900.00
Kaso Stut 5x7 m3 0.0291 1,500,000.00 43,650.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.4106 12,750.00 5,235.15
Paku 10cm kg 0.2200 11,250.00 2,475.00
Jumlah.a 125,200.65
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 147,025.65

A1069 Bekisting Poer/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi lbr 0.2278 180,000.00 41,004.00
Kaso Klam 4x6 m3 0.0286 1,500,000.00 42,900.00
Kaso Stut 5x7 m3 0.0291 1,500,000.00 43,650.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.4106 12,750.00 5,235.15
Paku 10cm kg 0.2200 11,250.00 2,475.00
Jumlah.a 135,451.65
Upah
Kenek ht 0.1650 90,000.00 14,850.00
Tk.Kayu Kasar ht 0.0825 81,000.00 6,682.50
Kep.Tukang ht 0.0165 108,000.00 1,782.00
Mandor ht 0.0055 126,000.00 693.00
Jumlah.b 24,007.50
Jumlah.a+b 159,459.15

528975646.xls
Page 107 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

A1070 Bekisting Sloof/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi 2x20 m3 0.0156 1,650,000.00 25,740.00
Kaso Klam 4x6 m3 0.0015 1,500,000.00 2,250.00
Kaso Stut 5x7 m3 0.0054 1,500,000.00 8,100.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1000 12,750.00 1,275.00
Paku 10cm kg 0.1100 11,250.00 1,237.50
Kawat Beton kg 0.0218 11,250.00 245.25
Jumlah.a 39,035.25
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 68,135.25

A1071 Bekisting Sloof/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi lbr 0.1909 135,000.00 25,771.50
Kaso Klam 4x6 m3 0.0206 1,500,000.00 30,900.00
Kaso Stut 5x7 m3 0.0054 1,500,000.00 8,100.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.3880 12,750.00 4,947.00
Paku 10cm kg 0.2200 11,250.00 2,475.00
Jumlah.a 72,381.00
Upah
Kenek ht 0.1750 90,000.00 15,750.00
Tk.Kayu Kasar ht 0.0875 81,000.00 7,087.50
Kep.Tukang ht 0.0175 108,000.00 1,890.00
Mandor ht 0.0058 126,000.00 735.00
Jumlah.b 25,462.50
Jumlah.a+b 97,843.50

A1072 Bekisting Sloof/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi lbr 0.1909 180,000.00 34,362.00
Kaso Klam 4x6 m3 0.0206 1,500,000.00 30,900.00
Kaso Stut 5x7 m3 0.0054 1,500,000.00 8,100.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.3880 12,750.00 4,947.00
Paku 10cm kg 0.2200 11,250.00 2,475.00
Jumlah.a 80,971.50
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 110,071.50

A1073 Bekisting Dinding/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi 2x20 m3 0.0025 1,650,000.00 4,125.00
Kaso Klam 4x6 m3 0.0120 1,500,000.00 18,000.00
Kaso Stut 5x7 m3 0.0180 1,500,000.00 27,000.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1000 12,750.00 1,275.00
Paku 10cm kg 0.1100 11,250.00 1,237.50
Kawat Beton kg 0.0218 11,250.00 245.25
Jumlah.a 52,070.25
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 81,170.25

528975646.xls
Page 108 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

A1074 Bekisting Dinding/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi lbr 0.1909 135,000.00 25,771.50
Kaso Klam 4x6 m3 0.0120 1,500,000.00 18,000.00
Kaso Stut 5x7 m3 0.0180 1,500,000.00 27,000.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.3880 12,750.00 4,947.00
Paku 10cm kg 0.2200 11,250.00 2,475.00
Jumlah.a 78,381.00
Upah
Kenek ht 0.1750 90,000.00 15,750.00
Tk.Kayu Kasar ht 0.0875 81,000.00 7,087.50
Kep.Tukang ht 0.0175 108,000.00 1,890.00
Mandor ht 0.0058 126,000.00 735.00
Jumlah.b 25,462.50
Jumlah.a+b 103,843.50

A1075 Bekisting Dinding/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi lbr 0.1909 180,000.00 34,362.00
Kaso Klam 4x6 m3 0.0120 1,500,000.00 18,000.00
Kaso Stut 5x7 m3 0.0180 1,500,000.00 27,000.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.3880 12,750.00 4,947.00
Paku 10cm kg 0.2200 11,250.00 2,475.00
Jumlah.a 86,971.50
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 116,071.50

PEK.STRUKTUR

Lantai1
B1001 Beton 1:1,5:2,5/m3,dgn Koral
Bahan
Semen sak 7.2000 52,500.00 378,000.00
Pasir Beton m3 0.5500 255,000.00 140,250.00
Koral Beton m3 0.8000 225,000.00 180,000.00
Jumlah.a 698,250.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 952,050.00

B1002 Beton 1:2:3/m3,dgn Koral


Bahan
Semen sak 6.4000 52,500.00 336,000.00
Pasir Beton m3 0.5500 255,000.00 140,250.00
Koral Beton m3 0.7500 225,000.00 168,750.00
Jumlah.a 645,000.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00

528975646.xls
Page 109 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 898,800.00

B1003 Beton 1:3:5/m3,dgn Koral


Bahan
Semen sak 4.8000 52,500.00 252,000.00
Pasir Beton m3 0.6500 255,000.00 165,750.00
Koral Beton m3 0.9000 225,000.00 202,500.00
Jumlah.a 620,250.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 874,050.00

B1004 Beton 1:1,5:2,5/m3,dgn Seplit


Bahan
Semen sak 7.2000 52,500.00 378,000.00
Pasir Beton m3 0.5500 255,000.00 140,250.00
Seplit 2X3 m3 0.8000 262,500.00 210,000.00
Jumlah.a 728,250.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
145,000.00
982,050.00

B1005 Beton 1:2:3/m3,dgn Seplit


Bahan
Semen sak 6.4000 52,500.00 336,000.00
Pasir Beton m3 0.5500 255,000.00 140,250.00
Seplit 2X3 m3 0.7500 262,500.00 196,875.00
Jumlah.a 673,125.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 926,925.00

528975646.xls
Page 110 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

B1006 Beton 1:3:5/m3,dgn Seplit


Bahan
Semen sak 4.8000 52,500.00 252,000.00
Pasir Beton m3 0.6500 255,000.00 165,750.00
Seplit 2X3 m3 0.9000 262,500.00 236,250.00
Jumlah.a 654,000.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tk.Batu Kasar ht 0.2667 108,000.00 28,800.00
Kep.Tukang ht 0.0533 108,000.00 5,760.00
Mandor ht 0.0178 126,000.00 2,240.00
Jumlah.b 108,800.00
Alat Bantu
Mixer m3 0.4000 250,000.00 100,000.00
Vibrator m3 0.4000 100,000.00 40,000.00
Ember bh 0.2000 10,000.00 2,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 145,000.00
Jumlah.a+b+c 907,800.00

B1007 Beton Ready Mix K.250/m3


Bahan
Beton K.250 m3 1.0300 767,250.00 790,267.50
Jumlah.a 790,267.50
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,163,267.50

B1008 Beton Ready Mix K.225/m3


Bahan
Beton K.225 m3 1.0300 742,500.00 764,775.00
Jumlah.a 764,775.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,137,775.00

B1009 Beton Ready Mix K.200/m3


Bahan
Beton K.200 m3 1.0300 729,300.00 751,179.00
Jumlah.a 751,179.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00

528975646.xls
Page 111 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,124,179.00

B1010 Beton Ready Mix K.175/m3


Bahan
Beton K.175 m3 1.0300 717,750.00 739,282.50
Jumlah.a 739,282.50
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,112,282.50

B1011 Beton Ready Mix K.150/m3


Bahan
Beton K.150 m3 1.0300 694,500.00 715,335.00
Jumlah.a 715,335.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,088,335.00

B1012 Beton Ready Mix K.125/m3


Bahan
Beton K.125 m3 1.0300 676,500.00 696,795.00
Jumlah.a 696,795.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Batu Kasar ht 0.1667 108,000.00 18,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 68,000.00
Alat Bantu Utama
Pompa m3 1.0000 200,000.00 200,000.00
Vibrator m3 1.0000 100,000.00 100,000.00
Ember bh 0.1250 10,000.00 1,250.00
Pacul bh 0.0250 50,000.00 1,250.00
Sekop bh 0.0250 100,000.00 2,500.00
Jumlah.c 305,000.00
Jumlah.a+b+c 1,069,795.00

B1013 Pembesian Polos/kg


Bahan
Besi Polos kg 1.1500 8,250.00 9,487.50
Kawat Beton kg 0.0150 11,250.00 168.75
Jumlah.a 9,656.25

528975646.xls
Page 112 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Buat & Pasang
Kenek ht 0.0200 90,000.00 1,800.00
Tk.Besi ht 0.0100 99,000.00 990.00
Kep.Tukang ht 0.0020 108,000.00 216.00
Mandor ht 0.0007 126,000.00 84.00
Jumlah.b 3,090.00
Alat Bantu
Bar Cutter kg 1.0000 400.00 400.00
Bar Binder kg 1.0000 400.00 400.00
Jumlah.c 800.00
Jumlah.a+b+c 13,546.25

B1014 Pembesian Ulir/kg


Bahan
Besi Ulir kg 1.1500 8,400.00 9,660.00
Kawat Beton kg 0.0150 11,250.00 168.75
Jumlah.a 9,828.75
Upah Buat & Pasang
Kenek ht 0.0200 90,000.00 1,800.00
Tk.Besi ht 0.0100 99,000.00 990.00
Kep.Tukang ht 0.0020 108,000.00 216.00
Mandor ht 0.0007 126,000.00 84.00
Jumlah.b 3,090.00
Alat Bantu
Bar Cutter kg 1.0000 400.00 400.00
Bar Binder kg 1.0000 400.00 400.00
Jumlah.c 800.00
Jumlah.a+b+c 13,718.75

B1015 Bekisting Kolom/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi 2x20 m3 0.0156 6,750,000.00 105,300.00
Kaso Klam 4x6 m3 0.0066 1,500,000.00 9,900.00
Kaso Stut 5x7 m3 0.0091 1,500,000.00 13,650.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1955 12,750.00 2,492.63
Paku 10cm kg 0.0916 11,250.00 1,030.50
Jumlah.a 132,560.63
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 161,660.63

B1016 Bekisting Kolom/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi lbr 0.1909 135,000.00 25,771.50
Kaso Klam 4x6 m3 0.0306 1,500,000.00 45,900.00
Kaso Stut 5x7 m3 0.0091 1,500,000.00 13,650.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.2440 12,750.00 3,111.00
Paku 10cm kg 0.0916 11,250.00 1,030.50
Jumlah.a 89,650.50
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 118,750.50

B1017 Bekisting Kolom/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi m3 0.1909 180,000.00 34,362.00
Kaso Klam 4x6 m3 0.0306 1,500,000.00 45,900.00
Kaso Stut 5x7 m3 0.0091 1,500,000.00 13,650.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.2440 12,750.00 3,111.00
Paku 10cm kg 0.0916 11,250.00 1,030.50
Jumlah.a 98,241.00

528975646.xls
Page 113 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.2200 90,000.00 19,800.00
Tk.Kayu Kasar ht 0.1100 81,000.00 8,910.00
Kep.Tukang ht 0.0220 108,000.00 2,376.00
Mandor ht 0.0073 126,000.00 924.00
Jumlah.b 32,010.00
Jumlah.a+b 130,251.00

B1018 Bekisting Balok/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi U 2x20 m3 0.0126 1,650,000.00 20,790.00
Papan Tumpuan 2x20 m3 0.0069 1,650,000.00 11,385.00
Papan Landasan Stut 2x20 m3 0.0042 1,650,000.00 6,930.00
Kaso Stut 5x7 m3 0.0365 1,500,000.00 54,750.00
Kaso Skur 4x6 m3 0.0060 1,500,000.00 9,000.00
Kaso Slempang 4x6 m3 0.0133 1,500,000.00 19,950.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.2200 12,750.00 2,805.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 128,610.00
Upah
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 43,650.00
Jumlah.a+b 172,260.00

B1019 Bekisting Balok/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi U lbr 0.1909 135,000.00 25,771.50
Papan Tumpuan 2x20 m3 0.0069 1,650,000.00 11,385.00
Papan Landasan 2x20 m3 0.0042 1,650,000.00 6,930.00
Kaso Stut 5x7 m3 0.0365 1,500,000.00 54,750.00
Kaso Skur 4x6 m3 0.0060 1,500,000.00 9,000.00
Kaso Slempang 4x6 m3 0.0133 1,500,000.00 19,950.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.2200 12,750.00 2,805.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 133,591.50
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 36,375.00
Jumlah.a+b 169,966.50

B1020 Bekisting Balok/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi U lbr 0.1909 180,000.00 34,362.00
Papan Tumpuan 2x20 m3 0.0069 1,650,000.00 11,385.00
Papan Landasan 2x20 m3 0.0042 1,650,000.00 6,930.00
Kaso Stut 5x7 m3 0.0365 1,500,000.00 54,750.00
Kaso Skur 4x6 m3 0.0060 1,500,000.00 9,000.00
Kaso Slempang 4x6 m3 0.0133 1,500,000.00 19,950.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.2200 12,750.00 2,805.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 142,182.00
Upah
Kenek ht 0.2750 90,000.00 24,750.00
Tk.Kayu Kasar ht 0.1375 81,000.00 11,137.50
Kep.Tukang ht 0.0275 108,000.00 2,970.00
Mandor ht 0.0092 126,000.00 1,155.00
Jumlah.b 40,012.50
Jumlah.a+b 182,194.50

528975646.xls
Page 114 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

B1021 Bekisting Plat/m2 2xpakai dgn Papan 2/20


Bahan
Papan Bawah 2x20 m3 0.0156 1,650,000.00 25,740.00
Papan Tumpuan 2x20 m3 0.0083 1,650,000.00 13,695.00
Papan Landasan 2x20 m3 0.0042 1,650,000.00 6,930.00
Kaso Stut 5x7 m3 0.0146 1,500,000.00 21,900.00
Kaso Slempang 4x6 m3 0.0066 1,500,000.00 9,900.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1686 12,750.00 2,149.65
Paku 10cm kg 0.0488 11,250.00 549.00
Jumlah.a 81,051.15
Upah
Kenek ht 0.2750 90,000.00 24,750.00
Tk.Kayu Kasar ht 0.1375 81,000.00 11,137.50
Kep.Tukang ht 0.0275 108,000.00 2,970.00
Mandor ht 0.0092 126,000.00 1,155.00
Jumlah.b 40,012.50
Jumlah.a+b 121,063.65

B1022 Bekisting Plat/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Bawah lbr 0.2278 135,000.00 30,753.00
Papan Tumpuan 2x20 m3 0.0083 1,650,000.00 13,695.00
Papan Landasan 2x20 m3 0.0042 1,650,000.00 6,930.00
Kaso Stut 5x7 m3 0.0146 1,500,000.00 21,900.00
Kaso Slempang 4x6 m3 0.0066 1,500,000.00 9,900.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1686 12,750.00 2,149.65
Paku 10cm kg 0.0488 11,250.00 549.00
Jumlah.a 86,064.15
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 115,164.15

B1023 Bekisting Plat/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Bawah lbr 0.2278 180,000.00 41,004.00
Papan Tumpuan 2x20 m3 0.0083 1,650,000.00 13,695.00
Papan Landasan 2x20 m3 0.0042 1,650,000.00 6,930.00
Kaso Stut 5x7 m3 0.0146 1,500,000.00 21,900.00
Kaso Slempang 4x6 m3 0.0066 1,500,000.00 9,900.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1686 12,750.00 2,149.65
Paku 10cm kg 0.0488 11,250.00 549.00
Jumlah.a 96,315.15
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 36,375.00
Jumlah.a+b 132,690.15

B1024 Bekisting Tangga/m2 2xpakai dgn Papan 2/20


Bahan
Papan Bawah 2x20 m3 0.0156 1,650,000.00 25,740.00
Papan Tumpuan 2x20 m3 0.0083 1,650,000.00 13,695.00
Papan Landasan 2x20 m3 0.0042 1,650,000.00 6,930.00
Kaso Stut 5x7 m3 0.0036 1,500,000.00 5,400.00
Kaso Slempang 4x6 m3 0.0016 1,500,000.00 2,400.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.2200 12,750.00 2,805.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 59,970.00

528975646.xls
Page 115 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Kasar ht 0.2750 81,000.00 22,275.00
Kep.Tukang ht 0.0550 108,000.00 5,940.00
Mandor ht 0.0183 126,000.00 2,310.00
Jumlah.b 80,025.00
Jumlah.a+b 139,995.00

B1025 Bekisting Tangga/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Bawah lbr 0.2278 135,000.00 30,753.00
Papan Tumpuan 2x20 m3 0.0083 1,650,000.00 13,695.00
Papan Landasan 2x20 m3 0.0042 1,650,000.00 6,930.00
Kaso Stut 5x7 m3 0.0073 1,500,000.00 10,950.00
Kaso Slempang 4x6 m3 0.0033 1,500,000.00 4,950.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1686 12,750.00 2,149.65
Paku 10cm kg 0.0488 11,250.00 549.00
Jumlah.a 70,164.15
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk.Kayu Kasar ht 0.2500 81,000.00 20,250.00
Kep.Tukang ht 0.0500 108,000.00 5,400.00
Mandor ht 0.0167 126,000.00 2,100.00
Jumlah.b 72,750.00
Jumlah.a+b 142,914.15

B1026 Bekisting Tangga/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Bawah lbr 0.2278 180,000.00 41,004.00
Papan Tumpuan 2x20 m3 0.0083 1,650,000.00 13,695.00
Papan Landasan 2x20 m3 0.0042 1,650,000.00 6,930.00
Kaso Stut 5x7 m3 0.0073 1,500,000.00 10,950.00
Kaso Slempang 4x6 m3 0.0033 1,500,000.00 4,950.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 5cm kg 0.1686 12,750.00 2,149.65
Paku 10cm kg 0.0488 11,250.00 549.00
Jumlah.a 80,415.15
Upah
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Kasar ht 0.3000 81,000.00 24,300.00
Kep.Tukang ht 0.0600 108,000.00 6,480.00
Mandor ht 0.0200 126,000.00 2,520.00
Jumlah.b 87,300.00
Jumlah.a+b 167,715.15

B1027 Bekisting Beton Praktis/m2


Bahan
Papan Tepi 2/20 m3 0.0231 1,650,000.00 38,115.00
Paku 5cm kg 0.1100 12,750.00 1,402.50
Kawat Beton kg 0.2200 11,250.00 2,475.00
Jumlah.a 41,992.50
Upah
Kenek ht 0.0782 90,000.00 7,038.00
Tk.Kayu Kasar ht 0.0782 81,000.00 6,334.20
Kep.Tukang ht 0.0078 108,000.00 844.56
Mandor ht 0.0026 126,000.00 328.44
Jumlah.b 14,545.20
Jumlah.a+b 56,537.70

528975646.xls
Page 116 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.DINDING

Lantai1
C1001 Kosen Kayu Jati Kwalitet Politur/m3
Kosen m3 1.0000 60,000,000.00 60,000,000.00
Koordinasi ls 1.0000 1,500,000.00 1,500,000.00
Jumlah 61,500,000.00

C1002 Kosen Kayu Jati Kwalitet Cat/m3


Kosen m3 1.0000 52,500,000.00 52,500,000.00
Koordinasi ls 1.0000 1,312,500.00 1,312,500.00
Jumlah 53,812,500.00

528975646.xls
Page 117 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

C1003 Kosen Kayu Bangkirai Kw.Politur/m3


Kosen m3 1.0000 9,750,000.00 9,750,000.00
Koordinasi ls 1.0000 487,500.00 487,500.00
Jumlah 10,237,500.00

C1004 Kosen Kayu Bangkirai Kw.Cat/m3


Kosen m3 1.0000 9,000,000.00 9,000,000.00
Koordinasi ls 1.0000 450,000.00 450,000.00
Jumlah 9,450,000.00

C1005 Kosen Kayu Kamper Samarinda Kw.Politur/m3


Kosen m3 1.0000 8,250,000.00 8,250,000.00
Koordinasi ls 1.0000 412,500.00 412,500.00
Jumlah 8,662,500.00

C1006 Kosen Kayu Kamper Samarinda Kw.Cat/m3


Kosen m3 1.0000 7,500,000.00 7,500,000.00
Koordinasi ls 1.0000 375,000.00 375,000.00
Jumlah 7,875,000.00

C1007 Kosen Kayu Kamper Medan Kw.Politur/m3


Kosen m3 1.0000 5,250,000.00 5,250,000.00
Koordinasi ls 1.0000 393,750.00 393,750.00
Jumlah 5,643,750.00

C1008 Kosen Kayu Kamper Medan Kw.Cat/m3


Kosen m3 1.0000 4,500,000.00 4,500,000.00
Koordinasi ls 1.0000 337,500.00 337,500.00
Jumlah 4,837,500.00

C1009 Kosen Kayu Meranti Kw.Politur/m3


Kosen m3 1.0000 3,750,000.00 3,750,000.00
Koordinasi ls 1.0000 375,000.00 375,000.00
Jumlah 4,125,000.00

C1010 Kosen Kayu Meranti Kw.Cat/m3


Kosen m3 1.0000 3,000,000.00 3,000,000.00
Koordinasi ls 1.0000 300,000.00 300,000.00
Jumlah 3,300,000.00

C1011 Kosen Kayu Nyatoh Kw.Politur/m3


Kosen m3 1.0000 3,750,000.00 3,750,000.00
Koordinasi ls 1.0000 375,000.00 375,000.00
Jumlah 4,125,000.00

C1012 Kosen Kayu Nyatoh Kw.Cat/m3


Kosen m3 1.0000 3,000,000.00 3,000,000.00
Koordinasi ls 1.0000 300,000.00 300,000.00
Jumlah 3,300,000.00

C1013 Stel & Pasang Kosen/m2


Bahan
Kaso Stut 5x7cm m3 0.0112 1,500,000.00 16,800.00
Paku 10cm kg 0.2200 11,250.00 2,475.00
Benang Rami glg 0.0500 3,750.00 187.50
Jumlah.a 19,462.50
Upah
Kenek ht 0.2750 90,000.00 24,750.00
Tk.Batu Kasar ht 0.0917 108,000.00 9,900.00
Kep.Tukang ht 0.0183 108,000.00 1,980.00
Mandor ht 0.0061 126,000.00 770.00
Jumlah.b 37,400.00
Jumlah.a+b 56,862.50

C1014 Beton Angkur/Locis Kosen dia 10mm/bh


Bahan, Upah & Alat
Besi Beton dia 12mm kg 0.1543 13,546.25 2,090.19
Beton 1Pc:2Psr:3Spl m3 0.0017 926,925.00 1,529.43
Bekisting Praktis m2 0.0750 56,537.70 4,240.33
Jumlah 7,859.94

528975646.xls
Page 118 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

C1015 Beton Angkur/Locis Kosen dia 12mm/bh


Bahan, Upah & Alat
Besi Beton dia 12mm kg 0.2220 13,546.25 3,007.27
Beton 1Pc:2Psr:3Spl m3 0.0017 926,925.00 1,529.43
Bekisting Praktis m2 0.0750 56,537.70 4,240.33
Jumlah 8,777.02

C1016 Pas.Bataco Semen Tebal 1 Batu 1:3/m2


Bahan
Bataco Semen bh 27.5000 2,250.00 61,875.00
Spesi 1:3 m3 0.0308 686,250.00 21,136.50
Jumlah.a 83,011.50
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 133,654.00

C1017 Pas.Bataco Semen Tebal 1 Batu 1:4/m2


Bahan
Bataco Semen bh 27.5000 2,250.00 61,875.00
Spesi 1:4 m3 0.0308 646,500.00 19,912.20
Jumlah.a 81,787.20
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 132,429.70

C1018 Pas.Bataco Semen Tebal 1 Batu 1:5/m2


Bahan
Bataco Semen bh 27.5000 2,250.00 61,875.00
Spesi 1:5 m3 0.0308 617,250.00 19,011.30
Jumlah.a 80,886.30
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 131,528.80

C1019 Pas.Bataco Semen Tebal 1 Batu 1:6/m2


Bahan
Bataco Semen bh 27.5000 2,250.00 61,875.00
Spesi 1:6 m3 0.0308 588,000.00 18,110.40
Jumlah.a 79,985.40

528975646.xls
Page 119 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 130,627.90

C1020 Pas.Bataco Semen Tebal 1 Batu 1:6/m2 Sopisopi


Bahan
Bataco Semen bh 27.5000 2,250.00 61,875.00
Spesi 1:6 m3 0.0308 588,000.00 18,110.40
Jumlah.a 79,985.40
Upah Pasang
Kenek ht 0.3450 90,000.00 31,050.00
Tk.Batu Kasar ht 0.1150 108,000.00 12,420.00
Kep.Tukang ht 0.0230 108,000.00 2,484.00
Mandor ht 0.0077 126,000.00 966.00
Jumlah.b 46,920.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 136,747.90

C1021 Pas.Batu Bata Kampung Tebal 1 Batu 1:3/m2


Bahan
Batu Bata bh 186.0000 300.00 55,800.00
Spesi 1:3 m3 0.0820 686,250.00 56,272.50
Jumlah.a 112,072.50
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 162,715.00

C1022 Pas.Batu Bata Kampung Tebal 1/2 Batu 1:4/m2


Bahan
Batu Bata bh 186.0000 300.00 55,800.00
Spesi 1:4 m3 0.0820 646,500.00 53,013.00
Jumlah.a 108,813.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 159,455.50

C1023 Pas.Batu Bata Kampung Tebal 1/2 Batu 1:5/m2

528975646.xls
Page 120 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Bahan
Batu Bata bh 186.0000 300.00 55,800.00
Spesi 1:5 m3 0.0820 617,250.00 50,614.50
Jumlah.a 106,414.50
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00

528975646.xls
Page 121 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 157,057.00

C1024 Pas.Batu Bata Kampung Tebal 1/2 Batu 1:6/m2


Bahan
Batu Bata bh 186.0000 300.00 55,800.00
Spesi 1:6 m3 0.0820 588,000.00 48,216.00
Jumlah.a 104,016.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 154,658.50

C1025 Pas.Batu Bata Kampung Tebal 1/2 Batu 1:6/m2 Sopisopi


Bahan
Batu Bata bh 186.0000 300.00 55,800.00
Spesi 1:6 m3 0.0820 588,000.00 48,216.00
Jumlah.a 104,016.00
Upah Pasang
Kenek ht 0.3450 90,000.00 31,050.00
Tk.Batu Kasar ht 0.1150 108,000.00 12,420.00
Kep.Tukang ht 0.0230 108,000.00 2,484.00
Mandor ht 0.0077 126,000.00 966.00
Jumlah.b 46,920.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 160,778.50

C1026 Pas.Batu Bata Kuo Shin Tebal 1 Batu 1:3/m2


Bahan
Batu Bata bh 150.2318 600.00 90,139.08
Spesi 1:3 m3 0.0654 686,250.00 44,880.75
Jumlah.a 135,019.83
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 185,662.33

C1027 Pas.Batu Bata Kuo Shin Tebal 1 Batu 1:4/m2


Bahan
Batu Bata bh 150.2318 600.00 90,139.08
Spesi 1:4 m3 0.0654 646,500.00 42,281.10
Jumlah.a 132,420.18
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00

528975646.xls
Page 122 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 183,062.68

528975646.xls
Page 123 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

C1028 Pas.Batu Bata Kuo Shin Tebal 1 Batu 1:5/m2


Bahan
Batu Bata bh 150.2318 600.00 90,139.08
Spesi 1:5 m3 0.0654 617,250.00 40,368.15
Jumlah.a 130,507.23
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 181,149.73

C1029 Pas.Batu Bata Kuo Shin Tebal 1 Batu 1:6/m2


Bahan
Batu Bata bh 150.2318 600.00 90,139.08
Spesi 1:6 m3 0.0654 588,000.00 38,455.20
Jumlah.a 128,594.28
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 179,236.78

C1030 Pas.Batu Bata Kuo Shin Tebal 1 Batu 1:6/m2 sopisopi


Bahan
Batu Bata bh 150.2318 600.00 90,139.08
Spesi 1:6 m3 0.0654 588,000.00 38,455.20
Jumlah.a 128,594.28
Upah Pasang
Kenek ht 0.3450 90,000.00 31,050.00
Tk.Batu Kasar ht 0.1150 108,000.00 12,420.00
Kep.Tukang ht 0.0230 108,000.00 2,484.00
Mandor ht 0.0077 126,000.00 966.00
Jumlah.b 46,920.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 185,356.78

C1031 Pas.Batu Bata Press Tebal 1 Batu 1:3/m2


Bahan
Batu Bata bh 150.0000 525.00 78,750.00
Spesi 1:3 m3 0.0750 686,250.00 51,468.75
Jumlah.a 130,218.75
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00

528975646.xls
Page 124 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 180,861.25

C1032 Pas.Batu Bata Press Tebal 1 Batu 1:4/m2


Bahan
Batu Bata bh 150.0000 525.00 78,750.00
Spesi 1:4 m3 0.0750 646,500.00 48,487.50
Jumlah.a 127,237.50
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00

528975646.xls
Page 125 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 177,880.00

C1033 Pas.Batu Bata Press Tebal 1 Batu 1:5/m2


Bahan
Batu Bata bh 150.0000 525.00 78,750.00
Spesi 1:5 m3 0.0750 617,250.00 46,293.75
Jumlah.a 125,043.75
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 175,686.25

C1034 Pas.Batu Bata Press Tebal 1 Batu 1:6/m2


Bahan
Batu Bata bh 150.0000 525.00 78,750.00
Spesi 1:6 m3 0.0750 588,000.00 44,100.00
Jumlah.a 122,850.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 173,492.50

C1035 Pas.Batu Bata Press Tebal 1 Batu 1:6/m2 Sopisopi


Bahan
Batu Bata bh 150.0000 525.00 78,750.00
Spesi 1:6 m3 0.0750 588,000.00 44,100.00
Jumlah.a 122,850.00
Upah Pasang
Kenek ht 0.3450 90,000.00 31,050.00
Tk.Batu Kasar ht 0.1150 108,000.00 12,420.00
Kep.Tukang ht 0.0230 108,000.00 2,484.00
Mandor ht 0.0077 126,000.00 966.00
Jumlah.b 46,920.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 179,612.50

C1036 Pas.Celcon Blok Tebal 1 Batu T.10cm 1:3/m2


Bahan
Celcon Blok bh 17.0000 10,500.00 178,500.00
Spesi 1:3 m3 0.0308 686,250.00 21,136.50
Jumlah.a 199,636.50
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00

528975646.xls
Page 126 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 250,279.00

528975646.xls
Page 127 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

C1037 Pas.Celcon Blok Tebal 1 Batu T.10cm 1:4/m2


Bahan
Celcon Blok bh 17.0000 10,500.00 178,500.00
Spesi 1:4 m3 0.0308 646,500.00 19,912.20
Jumlah.a 198,412.20
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 249,054.70

C1038 Pas.Celcon Blok Tebal 1 Batu T.10cm 1:5/m2


Bahan
Celcon Blok bh 17.0000 10,500.00 178,500.00
Spesi 1:5 m3 0.0308 617,250.00 19,011.30
Jumlah.a 197,511.30
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 248,153.80

C1039 Pas.Celcon Blok Tebal 1 Batu T.10cm 1:6/m2


Bahan
Celcon Blok bh 17.0000 10,500.00 178,500.00
Spesi 1:6 m3 0.0308 588,000.00 18,110.40
Jumlah.a 196,610.40
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 247,252.90

C1040 Pas.Celcon Blok Tebal 1 Batu T.10cm 1:6/m2 sopisopi


Bahan
Celcon Blok bh 17.0000 10,500.00 178,500.00
Spesi 1:6 m3 0.0308 588,000.00 18,110.40
Jumlah.a 196,610.40
Upah Pasang
Kenek ht 0.3450 90,000.00 31,050.00
Tk.Batu Kasar ht 0.1150 108,000.00 12,420.00
Kep.Tukang ht 0.0230 108,000.00 2,484.00
Mandor ht 0.0077 126,000.00 966.00
Jumlah.b 46,920.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00

528975646.xls
Page 128 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 253,372.90

C1041 Pas.Celcon Blok Tebal 1 Batu T.7,5cm 1:3/m2


Bahan
Celcon Blok bh 17.0000 7,800.00 132,600.00
Spesi 1:3 m3 0.0230 686,250.00 15,783.75
Jumlah.a 148,383.75
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00

528975646.xls
Page 129 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 199,026.25

C1042 Pas.Celcon Blok Tebal 1 Batu T.7,5cm 1:4/m2


Bahan
Celcon Blok bh 17.0000 7,800.00 132,600.00
Spesi 1:4 m3 0.0230 646,500.00 14,869.50
Jumlah.a 147,469.50
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 198,112.00

C1043 Pas.Celcon Blok Tebal 1 Batu T.7,5cm 1:5/m2


Bahan
Celcon Blok bh 17.0000 7,800.00 132,600.00
Spesi 1:5 m3 0.0230 617,250.00 14,196.75
Jumlah.a 146,796.75
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 197,439.25

C1044 Pas.Celcon Blok Tebal 1 Batu T.7,5cm 1:6/m2


Bahan
Celcon Blok bh 17.0000 7,800.00 132,600.00
Spesi 1:6 m3 0.0230 588,000.00 13,524.00
Jumlah.a 146,124.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 40,800.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 196,766.50

528975646.xls
Page 130 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

C1045 Pas.Celcon Blok Tebal 1 Batu T.7,5cm 1:6/m2 Sopisopi


Bahan
Celcon Blok bh 17.0000 7,800.00 132,600.00
Spesi 1:6 m3 0.0230 588,000.00 13,524.00
Jumlah.a 146,124.00
Upah Pasang
Kenek ht 0.3450 90,000.00 31,050.00
Tk.Batu Kasar ht 0.1150 108,000.00 12,420.00
Kep.Tukang ht 0.0230 108,000.00 2,484.00
Mandor ht 0.0077 126,000.00 966.00
Jumlah.b 46,920.00
Alat Bantu
Kaso Profil 5/7 m3 0.0040 1,500,000.00 6,000.00
Benang Rami m3 0.1180 3,750.00 442.50
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Sekop bh 0.0200 100,000.00 2,000.00
Jumlah.c 9,842.50
Jumlah.a+b+c 202,886.50

C1046 Pas.Bataco Semen Tebal 1/2 Batu 1:3/m2


Bahan
Bataco Semen bh 13.7500 2,250.00 30,937.50
Spesi 1:3 m3 0.0154 686,250.00 10,568.25
Jumlah.a 41,505.75
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 66,827.00

C1047 Pas.Bataco Semen Tebal 1/2 Batu 1:4/m2


Bahan
Bataco Semen bh 13.7500 2,250.00 30,937.50
Spesi 1:4 m3 0.0154 646,500.00 9,956.10
Jumlah.a 40,893.60
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 66,214.85

C1048 Pas.Bataco Semen Tebal 1/2 Batu 1:5/m2


Bahan
Bataco Semen bh 13.7500 2,250.00 30,937.50
Spesi 1:5 m3 0.0154 617,250.00 9,505.65
Jumlah.a 40,443.15
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00

528975646.xls
Page 131 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 65,764.40

C1049 Pas.Bataco Semen Tebal 1/2 Batu 1:6/m2


Bahan
Bataco Semen bh 13.7500 2,250.00 30,937.50
Spesi 1:6 m3 0.0154 588,000.00 9,055.20
Jumlah.a 39,992.70
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00

528975646.xls
Page 132 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 65,313.95

C1050 Pas.Bataco Semen Tebal 1/2 Batu 1:6/m2 Sopisopi


Bahan
Bataco Semen bh 13.7500 2,250.00 30,937.50
Spesi 1:6 m3 0.0154 588,000.00 9,055.20
Jumlah.a 39,992.70
Upah Pasang
Kenek ht 0.1725 90,000.00 15,525.00
Tk.Batu Kasar ht 0.0575 108,000.00 6,210.00
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 23,460.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 68,373.95

C1051 Pas.Batu Bata Kampung Tebal 1/2 Batu 1:3/m2


Bahan
Batu Bata bh 93.0000 300.00 27,900.00
Spesi 1:3 m3 0.0410 686,250.00 28,136.25
Jumlah.a 56,036.25
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 81,357.50

C1052 Pas.Batu Bata Kampung Tebal 1/2 Batu 1:4/m2


Bahan
Batu Bata bh 93.0000 300.00 27,900.00
Spesi 1:4 m3 0.0410 646,500.00 26,506.50
Jumlah.a 54,406.50
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 79,727.75

C1053 Pas.Batu Bata Kampung Tebal 1/2 Batu 1:5/m2


Bahan
Batu Bata bh 93.0000 300.00 27,900.00
Spesi 1:5 m3 0.0410 617,250.00 25,307.25
Jumlah.a 53,207.25
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00

528975646.xls
Page 133 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 78,528.50

528975646.xls
Page 134 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

C1054 Pas.Batu Bata Kampung Tebal 1/2 Batu 1:6/m2


Bahan
Batu Bata bh 93.0000 300.00 27,900.00
Spesi 1:6 m3 0.0410 588,000.00 24,108.00
Jumlah.a 52,008.00
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 77,329.25

C1055 Pas.Batu Bata Kampung Tebal 1/2 Batu 1:6/m2 Sopisopi


Bahan
Batu Bata bh 93.0000 300.00 27,900.00
Spesi 1:6 m3 0.0410 588,000.00 24,108.00
Jumlah.a 52,008.00
Upah Pasang
Kenek ht 0.1725 90,000.00 15,525.00
Tk.Batu Kasar ht 0.0575 108,000.00 6,210.00
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 23,460.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 80,389.25

C1056 Pas.Batu Bata Kuo Shin Tebal 1/2 Batu 1:3/m2


Bahan
Batu Bata bh 75.1159 600.00 45,069.54
Spesi 1:3 m3 0.0327 686,250.00 22,440.38
Jumlah.a 67,509.92
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 92,831.17

C1057 Pas.Batu Bata Kuo Shin Tebal 1/2 Batu 1:4/m2


Bahan
Batu Bata bh 75.1159 600.00 45,069.54
Spesi 1:4 m3 0.0327 646,500.00 21,140.55
Jumlah.a 66,210.09
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00

528975646.xls
Page 135 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 91,531.34

C1058 Pas.Batu Bata Kuo Shin Tebal 1/2 Batu 1:5/m2


Bahan
Batu Bata bh 75.1159 600.00 45,069.54
Spesi 1:5 m3 0.0327 617,250.00 20,184.08
Jumlah.a 65,253.62
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00

528975646.xls
Page 136 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 90,574.87

C1059 Pas.Batu Bata Kuo Shin Tebal 1/2 Batu 1:6/m2


Bahan
Batu Bata bh 75.1159 600.00 45,069.54
Spesi 1:6 m3 0.0327 588,000.00 19,227.60
Jumlah.a 64,297.14
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 89,618.39

C1060 Pas.Batu Bata Kuo Shin Tebal 1/2 Batu 1:6/m2 Sopisopi
Bahan
Batu Bata bh 75.1159 600.00 45,069.54
Spesi 1:6 m3 0.0327 588,000.00 19,227.60
Jumlah.a 64,297.14
Upah Pasang
Kenek ht 0.1725 90,000.00 15,525.00
Tk.Batu Kasar ht 0.0575 108,000.00 6,210.00
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 23,460.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 92,678.39

C1061 Pas.Batu Bata Press Tebal 1/2 Batu 1:3/m2


Bahan
Batu Bata bh 75.0000 525.00 39,375.00
Spesi 1:3 m3 0.0375 686,250.00 25,734.38
Jumlah.a 65,109.38
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 90,430.63

C1062 Pas.Batu Bata Press Tebal 1/2 Batu 1:4/m2


Bahan
Batu Bata bh 75.0000 525.00 39,375.00
Spesi 1:4 m3 0.0375 646,500.00 24,243.75
Jumlah.a 63,618.75
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00

528975646.xls
Page 137 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 88,940.00

528975646.xls
Page 138 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

C1063 Pas.Batu Bata Press Tebal 1/2 Batu 1:5/m2


Bahan
Batu Bata bh 75.0000 525.00 39,375.00
Spesi 1:5 m3 0.0375 617,250.00 23,146.88
Jumlah.a 62,521.88
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 87,843.13

C1064 Pas.Batu Bata Press Tebal 1/2 Batu 1:6/m2


Bahan
Batu Bata bh 75.0000 525.00 39,375.00
Spesi 1:6 m3 0.0375 588,000.00 22,050.00
Jumlah.a 61,425.00
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 86,746.25

C1065 Pas.Batu Bata Press Tebal 1/2 Batu 1:6/m2 Sopisopi


Bahan
Batu Bata bh 75.0000 525.00 39,375.00
Spesi 1:6 m3 0.0375 588,000.00 22,050.00
Jumlah.a 61,425.00
Upah Pasang
Kenek ht 0.1725 90,000.00 15,525.00
Tk.Batu Kasar ht 0.0575 108,000.00 6,210.00
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 23,460.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 89,806.25

C1066 Pas.Celcon Blok Tebal 1/2 Batu T.10cm 1:3/m2


Bahan
Celcon Blok bh 8.5000 10,500.00 89,250.00
Spesi 1:3 m3 0.0154 686,250.00 10,568.25
Jumlah.a 99,818.25
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00

528975646.xls
Page 139 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 125,139.50

C1067 Pas.Celcon Blok Tebal 1/2 Batu T.10cm 1:4/m2


Bahan
Celcon Blok bh 8.5000 10,500.00 89,250.00
Spesi 1:4 m3 0.0154 646,500.00 9,956.10
Jumlah.a 99,206.10
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00

528975646.xls
Page 140 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 124,527.35

C1068 Pas.Celcon Blok Tebal 1/2 Batu T.10cm 1:5/m2


Bahan
Celcon Blok bh 8.5000 10,500.00 89,250.00
Spesi 1:5 m3 0.0154 617,250.00 9,505.65
Jumlah.a 98,755.65
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 124,076.90

C1069 Pas.Celcon Blok Tebal 1/2 Batu T.10cm 1:6/m2


Bahan
Celcon Blok bh 8.5000 10,500.00 89,250.00
Spesi 1:6 m3 0.0154 588,000.00 9,055.20
Jumlah.a 98,305.20
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 123,626.45

C1070 Pas.Celcon Blok Tebal 1/2 Batu T.10cm 1:6/m2 sopisopi


Bahan
Celcon Blok bh 8.3300 10,500.00 87,465.00
Spesi 1:6 m3 0.0154 588,000.00 9,055.20
Jumlah.a 96,520.20
Upah Pasang
Kenek ht 0.1725 90,000.00 15,525.00
Tk.Batu Kasar ht 0.0575 108,000.00 6,210.00
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 23,460.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 124,901.45

C1071 Pas.Hebel Tebal 1/2 Batu T.7,5cm 1:3/m2


Bahan
Hebel bh 8.3300 7,800.00 64,974.00
Spesi 1:3 m3 0.0115 686,250.00 7,891.88
Jumlah.a 72,865.88
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00

528975646.xls
Page 141 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 98,187.13

528975646.xls
Page 142 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

C1072 Pas.Hebel Blok Tebal 1/2 Batu T.7,5cm 1:4/m2


Bahan
Celcon Blok bh 8.3300 7,800.00 64,974.00
Spesi 1:4 m3 0.0115 646,500.00 7,434.75
Jumlah.a 72,408.75
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 97,730.00

C1073 Pas.Hebel Tebal 1/2 Batu T.7,5cm 1:5/m2


Bahan
Celcon Blok bh 8.3300 7,800.00 64,974.00
Spesi 1:5 m3 0.0115 617,250.00 7,098.38
Jumlah.a 72,072.38
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 97,393.63

C1074 Pas.Celcon Blok Tebal 1/2 Batu T.7,5cm 1:6/m2


Bahan
Celcon Blok bh 8.3300 7,800.00 64,974.00
Spesi 1:6 m3 0.0115 588,000.00 6,762.00
Jumlah.a 71,736.00
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 20,400.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 97,057.25

C1075 Pas.Celcon Blok Tebal 1/2 Batu T.7,5cm 1:6/m2 Sopisopi


Bahan
Celcon Blok bh 8.3300 7,800.00 64,974.00
Spesi 1:6 m3 0.0115 588,000.00 6,762.00
Jumlah.a 71,736.00
Upah Pasang
Kenek ht 0.1725 90,000.00 15,525.00
Tk.Batu Kasar ht 0.0575 108,000.00 6,210.00
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 23,460.00
Alat Bantu
Kaso Profil 5/7 m3 0.0020 1,500,000.00 3,000.00
Benang Rami m3 0.0590 3,750.00 221.25
Ember bh 0.0200 10,000.00 200.00

528975646.xls
Page 143 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 4,921.25
Jumlah.a+b+c 100,117.25

Lantai2

528975646.xls
Page 144 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.BETON TULANG PRAKTIS

Lantai1
D1001 Kolom Praktis 20x20cm/m'
(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.8000 56,537.70 45,230.16
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.5800 13,546.25 21,403.08
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 199,945.84

528975646.xls
Page 145 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

D1002 Kolom Praktis 20x20cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.8000 56,537.70 45,230.16
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.5800 13,546.25 21,403.08
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 183,793.29

D1003 Kolom Praktis 20x20cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.8000 56,537.70 45,230.16
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.8880 13,546.25 12,029.07
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 161,187.31

D1004 Kolom Praktis 15x20cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.7000 56,537.70 39,576.39
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.3825 13,546.25 18,727.69
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 181,420.51

D1005 Kolom Praktis 15x20cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.7000 56,537.70 39,576.39
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.3825 13,546.25 18,727.69
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 165,267.97

D1006 Kolom Praktis 15x20cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.7000 56,537.70 39,576.39
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.7770 13,546.25 10,525.44
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 143,833.73

D1007 Kolom Praktis 15x15cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.6000 56,537.70 33,922.62
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.1850 13,546.25 16,052.31
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 166,139.42

D1008 Kolom Praktis 15x15cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.6000 56,537.70 33,922.62
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.1850 13,546.25 16,052.31
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 149,986.87

D1009 Kolom Praktis 15x15cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.6000 56,537.70 33,922.62
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.6660 13,546.25 9,021.80
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 129,724.39

528975646.xls
Page 146 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

D1010 Kolom Praktis 10x15cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.5000 56,537.70 28,268.85
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 0.9875 13,546.25 13,376.92
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 149,467.94

D1011 Kolom Praktis 10x15cm m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.5000 56,537.70 28,268.85
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 0.9875 13,546.25 13,376.92
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 133,315.39

D1012 Kolom Praktis 10x15cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.5000 56,537.70 28,268.85
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.5550 13,546.25 7,518.17
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 114,224.66

D1013 Beton Kolom Praktis/m'(10x10cm)


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 0.7900 13,546.25 10,701.54
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 130,386.93

D1014 Beton Kolom Praktis/m'(10x10cm)


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 0.7900 13,546.25 10,701.54
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 114,234.38

D1015 Beton Kolom Praktis/m'(10x10cm)


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 10mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 8mm kg 0.4440 13,546.25 6,014.54
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 96,315.40

D1016 Ringbalk Praktis 20x20cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.5800 13,546.25 21,403.08
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 187,230.76

D1017 Ringbalk Praktis 20x20cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.5800 13,546.25 21,403.08
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 171,078.21

528975646.xls
Page 147 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

D1018 Ringbalk Praktis 20x20cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.8880 13,546.25 12,029.07
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 148,472.23

D1019 Ringbalk Praktis 15x20cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.3825 13,546.25 18,727.69
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 174,359.20

D1020 Ringbalk Praktis 15x20cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.3825 13,546.25 18,727.69
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 158,206.66

D1021 Ringbalk Praktis 15x20cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.7770 13,546.25 10,525.44
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 136,772.42

D1022 Ringbalk Praktis 15x15cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.1850 13,546.25 16,052.31
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 159,078.11

D1023 Ringbalk Praktis 15x15cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.1850 13,546.25 16,052.31
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 142,925.56

D1024 Ringbalk Praktis 15x15cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.6660 13,546.25 9,021.80
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 122,663.08

D1025 Ringbalk Praktis 10x15cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 0.9875 13,546.25 13,376.92
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 148,060.40

528975646.xls
Page 148 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

D1026 Ringbalk Praktis 10x15cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 0.9875 13,546.25 13,376.92
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 131,907.85

D1027 Ringbalk Praktis 10x15cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.5550 13,546.25 7,518.17
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 112,817.12

D1028 Ringbalk Praktis 10x10cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.2000 56,537.70 11,307.54
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 0.7900 13,546.25 10,701.54
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 134,633.16

D1029 Ringbalk Praktis 10x10cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.2000 56,537.70 11,307.54
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 0.7900 13,546.25 10,701.54
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 118,480.61

D1030 Ringbalk Praktis 10x10cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.2000 56,537.70 11,307.54
Pembesian Polos dia 10mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 8mm kg 0.4440 13,546.25 6,014.54
Tambahan Upah Tk.Batu+Kenek ht 0.2500 198,000.00 49,500.00
Jumlah 100,561.63

D1031 Kolom Sopisopi 20x20cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.8000 56,537.70 45,230.16
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.5800 13,546.25 21,403.08
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 219,745.84

D1032 Kolom Sopisopi 20x20cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.8000 56,537.70 45,230.16
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.5800 13,546.25 21,403.08
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 203,593.29

D1033 Kolom Sopisopi 20x20cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.8000 56,537.70 45,230.16
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.8880 13,546.25 12,029.07
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 180,987.31

528975646.xls
Page 149 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

D1034 Kolom Sopisopi 15x20cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.7000 56,537.70 39,576.39
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.3825 13,546.25 18,727.69
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 201,220.51

D1035 Kolom Sopisopi 15x20cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.7000 56,537.70 39,576.39
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.3825 13,546.25 18,727.69
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 185,067.97

D1036 Kolom Sopisopi 15x20cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.7000 56,537.70 39,576.39
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.7770 13,546.25 10,525.44
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 163,633.73

D1037 Kolom Sopisopi 15x15cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.6000 56,537.70 33,922.62
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.1850 13,546.25 16,052.31
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 185,939.42

D1038 Kolom Sopisopi 15x15cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.6000 56,537.70 33,922.62
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.1850 13,546.25 16,052.31
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 169,786.87

D1039 Kolom Sopisopi 15x15cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.6000 56,537.70 33,922.62
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.6660 13,546.25 9,021.80
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 149,524.39

D1040 Kolom Sopisopi 10x15cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.5000 56,537.70 28,268.85
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 0.9875 13,546.25 13,376.92
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 169,267.94

D1041 Kolom Sopisopi 10x15cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.5000 56,537.70 28,268.85
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 0.9875 13,546.25 13,376.92
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 153,115.39

528975646.xls
Page 150 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

D1042 Kolom Sopisopi 10x15cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.5000 56,537.70 28,268.85
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.5550 13,546.25 7,518.17
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 134,024.66

D1043 Kolom Sopisopi 10x10cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 0.7900 13,546.25 10,701.54
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 150,186.93

D1044 Kolom Sopisopi 10x10cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 0.7900 13,546.25 10,701.54
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 134,034.38

D1045 Kolom Sopisopi 10x10cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 10mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 8mm kg 0.4440 13,546.25 6,014.54
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 116,115.40

D1046 Ringbalk Sopisopi 20x20cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.5800 13,546.25 21,403.08
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 197,130.76

D1047 Ringbalk Sopisopi 20x20cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.5800 13,546.25 21,403.08
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 180,978.21

D1048 Ringbalk Sopisopi 20x20cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0440 926,925.00 40,784.70
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.8880 13,546.25 12,029.07
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 158,372.23

D1049 Ringbalk Sopisopi 15x20cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.3825 13,546.25 18,727.69
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 184,259.20

528975646.xls
Page 151 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

D1050 Ringbalk Sopisopi 15x20cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.3825 13,546.25 18,727.69
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 168,106.66

D1051 Ringbalk Sopisopi 15x20cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0330 926,925.00 30,588.53
Bekisting Praktis m2 0.4000 56,537.70 22,615.08
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.7770 13,546.25 10,525.44
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 146,672.42

D1052 Ringbalk Sopisopi 15x15cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 1.1850 13,546.25 16,052.31
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 168,978.11

D1053 Ringbalk Sopisopi 15x15cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 1.1850 13,546.25 16,052.31
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 152,825.56

D1054 Ringbalk Sopisopi 15x15cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0255 926,925.00 23,636.59
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.6660 13,546.25 9,021.80
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 132,563.08

D1055 Ringbalk Sopisopi 10x15cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 0.9875 13,546.25 13,376.92
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 157,960.40

D1056 Ringbalk Sopisopi 10x15cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 0.9875 13,546.25 13,376.92
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 141,807.85

D1057 Ringbalk Sopisopi 10x15cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0165 926,925.00 15,294.26
Bekisting Praktis m2 0.3000 56,537.70 16,961.31
Pembesian Polos dia 8mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 6mm kg 0.5550 13,546.25 7,518.17
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 122,717.12

528975646.xls
Page 152 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

D1058 Ringbalk Sopisopi 10x10cm/m'


(4dia 12mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.2000 56,537.70 11,307.54
Pembesian Polos dia 12mm kg 3.9072 13,546.25 52,927.91
Pembesian Polos dia 8mm kg 0.7900 13,546.25 10,701.54
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 144,533.16

D1059 Ringbalk Sopisopi 10x10cm/m'


(4dia 10mm+dia 8mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.2000 56,537.70 11,307.54
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 0.7900 13,546.25 10,701.54
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 128,380.61

D1060 Ringbalk Sopisopi 10x10cm/m'


(4dia 8mm+dia 6mm20cm)
Beton 1Pc:2Psr:3Spl m3 0.0110 926,925.00 10,196.18
Bekisting Praktis m2 0.2000 56,537.70 11,307.54
Pembesian Polos dia 10mm kg 1.7380 13,546.25 23,543.38
Pembesian Polos dia 8mm kg 0.4440 13,546.25 6,014.54
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 110,461.63

528975646.xls
Page 153 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.ATAP

Lantai1
E1001 Kudakuda Kayu Jati Non Exposed/m3
Bahan
Balok Kayu Jati m3 1.2500 30,000,000.00 37,500,000.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 37,931,250.00
Upah
Kenek ht 6.0000 90,000.00 540,000.00
Tk.Kayu Kasar ht 6.0000 81,000.00 486,000.00
Kep.Tukang ht 1.2000 108,000.00 129,600.00
Mandor ht 0.4000 126,000.00 50,400.00
Jumlah.b 1,206,000.00
Jumlah.a+b 39,137,250.00

E1002 Kudakuda Kayu Bangkirai Non Exposed/m3


Bahan
Balok Kayu Bangkirai m3 1.2500 6,000,000.00 7,500,000.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 7,931,250.00
Upah
Kenek ht 6.0000 90,000.00 540,000.00
Tk.Kayu Kasar ht 6.0000 81,000.00 486,000.00
Kep.Tukang ht 1.2000 108,000.00 129,600.00
Mandor ht 0.4000 126,000.00 50,400.00
Jumlah.b 1,206,000.00
Jumlah.a+b 9,137,250.00

528975646.xls
Page 154 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
E1003 Kudakuda Kayu Kamper Samarinda Non Exposed/m3
Bahan
Balok Kayu Kamper Samarinda m3 1.2500 5,250,000.00 6,562,500.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 6,993,750.00
Upah
Kenek ht 6.0000 90,000.00 540,000.00
Tk.Kayu Kasar ht 6.0000 81,000.00 486,000.00
Kep.Tukang ht 1.2000 108,000.00 129,600.00
Mandor ht 0.4000 126,000.00 50,400.00
Jumlah.b 1,206,000.00
Jumlah.a+b 8,199,750.00

528975646.xls
Page 155 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1004 Kudakuda Kayu Kamper Medan Non Exposed/m3


Bahan
Balok Kayu Kamper Medan m3 1.2500 3,750,000.00 4,687,500.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 5,118,750.00
Upah
Kenek ht 6.0000 90,000.00 540,000.00
Tk.Kayu Kasar ht 6.0000 81,000.00 486,000.00
Kep.Tukang ht 1.2000 108,000.00 129,600.00
Mandor ht 0.4000 126,000.00 50,400.00
Jumlah.b 1,206,000.00
Jumlah.a+b 6,324,750.00

E1005 Kudakuda Kayu Meranti Non Exposed/m3


Bahan
Balok Kayu Meranti m3 1.2500 1,800,000.00 2,250,000.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 2,681,250.00
Upah
Kenek ht 6.0000 90,000.00 540,000.00
Tk.Kayu Kasar ht 6.0000 81,000.00 486,000.00
Kep.Tukang ht 1.2000 108,000.00 129,600.00
Mandor ht 0.4000 126,000.00 50,400.00
Jumlah.b 1,206,000.00
Jumlah.a+b 3,887,250.00

E1006 Kudakuda Kayu Borneo Non Exposed/m3


Bahan
Balok Kayu Borneo m3 1.2500 1,650,000.00 2,062,500.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 2,493,750.00
Upah
Kenek ht 6.0000 90,000.00 540,000.00
Tk.Kayu Kasar ht 6.0000 81,000.00 486,000.00
Kep.Tukang ht 1.2000 108,000.00 129,600.00
Mandor ht 0.4000 126,000.00 50,400.00
Jumlah.b 1,206,000.00
Jumlah.a+b 3,699,750.00

E1007 Gording Non Exposed Kayu Jati/m3


Bahan
Balok Kayu m3 1.2000 30,000,000.00 36,000,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 36,033,750.00
Upah
Kenek ht 4.0000 90,000.00 360,000.00
Tk.Kayu Kasar ht 4.0000 81,000.00 324,000.00
Kep.Tukang ht 0.8000 108,000.00 86,400.00
Mandor ht 0.2667 126,000.00 33,600.00
Jumlah.b 804,000.00
Jumlah.a+b 36,837,750.00

E1008 Gording Non Exposed Kayu Bangkirai/m3


Bahan
Balok Kayu m3 1.2000 6,000,000.00 7,200,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 7,233,750.00
Upah
Kenek ht 4.0000 90,000.00 360,000.00
Tk.Kayu Kasar ht 4.0000 81,000.00 324,000.00
Kep.Tukang ht 0.8000 108,000.00 86,400.00
Mandor ht 0.2667 126,000.00 33,600.00
Jumlah.b 804,000.00
Jumlah.a+b 8,037,750.00

528975646.xls
Page 156 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1009 Gording Non Exposed Kayu Kamper Samarinda/m3


Bahan
Balok Kayu m3 1.2000 5,250,000.00 6,300,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 6,333,750.00
Upah
Kenek ht 4.0000 90,000.00 360,000.00
Tk.Kayu Kasar ht 4.0000 81,000.00 324,000.00
Kep.Tukang ht 0.8000 108,000.00 86,400.00
Mandor ht 0.2667 126,000.00 33,600.00
Jumlah.b 804,000.00
Jumlah.a+b 7,137,750.00

E1010 Gording Non Exposed Kayu Kamper Medan/m3


Bahan
Balok Kayu m3 1.2000 3,750,000.00 4,500,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 4,533,750.00
Upah
Kenek ht 4.0000 90,000.00 360,000.00
Tk.Kayu Kasar ht 4.0000 81,000.00 324,000.00
Kep.Tukang ht 0.8000 108,000.00 86,400.00
Mandor ht 0.2667 126,000.00 33,600.00
Jumlah.b 804,000.00
Jumlah.a+b 5,337,750.00

E1011 Gording Non Exposed Kayu Meranti/m3


Bahan
Balok Kayu m3 1.2000 1,800,000.00 2,160,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 2,193,750.00
Upah
Kenek ht 4.0000 90,000.00 360,000.00
Tk.Kayu Kasar ht 4.0000 81,000.00 324,000.00
Kep.Tukang ht 0.8000 108,000.00 86,400.00
Mandor ht 0.2667 126,000.00 33,600.00
Jumlah.b 804,000.00
Jumlah.a+b 2,997,750.00

E1012 Gording Non Exposed Kayu Borneo/m3


Bahan
Balok Kayu m3 1.2000 1,650,000.00 1,980,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 2,013,750.00
Upah
Kenek ht 4.0000 90,000.00 360,000.00
Tk.Kayu Kasar ht 4.0000 81,000.00 324,000.00
Kep.Tukang ht 0.8000 108,000.00 86,400.00
Mandor ht 0.2667 126,000.00 33,600.00
Jumlah.b 804,000.00
Jumlah.a+b 2,817,750.00

E1013 Kudakuda Exposed Kayu Jati/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2500 30,450,000.00 38,062,500.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 38,493,750.00
Upah
Kenek ht 6.6000 90,000.00 594,000.00
Tk.Kayu Kasar ht 6.6000 81,000.00 534,600.00
Kep.Tukang ht 1.3200 108,000.00 142,560.00
Mandor ht 0.4400 126,000.00 55,440.00
Jumlah.b 1,326,600.00
Jumlah.a+b 39,820,350.00

E1014 Kudakuda Exposed Kayu Bangkirai/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2500 6,450,000.00 8,062,500.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 8,493,750.00

528975646.xls
Page 157 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 6.6000 90,000.00 594,000.00
Tk.Kayu Kasar ht 6.6000 81,000.00 534,600.00
Kep.Tukang ht 1.3200 108,000.00 142,560.00
Mandor ht 0.4400 126,000.00 55,440.00
Jumlah.b 1,326,600.00
Jumlah.a+b 9,820,350.00

E1015 Kudakuda Exposed Kayu Kamper Samarinda/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2500 5,550,000.00 6,937,500.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 7,368,750.00
Upah
Kenek ht 6.6000 90,000.00 594,000.00
Tk.Kayu Kasar ht 6.6000 81,000.00 534,600.00
Kep.Tukang ht 1.3200 108,000.00 142,560.00
Mandor ht 0.4400 126,000.00 55,440.00
Jumlah.b 1,326,600.00
Jumlah.a+b 8,695,350.00

E1016 Kudakuda Exposed Kayu Kamper Medan/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2500 4,050,000.00 5,062,500.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 5,493,750.00
Upah
Kenek ht 6.6000 90,000.00 594,000.00
Tk.Kayu Kasar ht 6.6000 81,000.00 534,600.00
Kep.Tukang ht 1.3200 108,000.00 142,560.00
Mandor ht 0.4400 126,000.00 55,440.00
Jumlah.b 1,326,600.00
Jumlah.a+b 6,820,350.00

E1017 Kudakuda Exposed Kayu Meranti/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2500 2,100,000.00 2,625,000.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 3,056,250.00
Upah
Kenek ht 6.6000 90,000.00 594,000.00
Tk.Kayu Kasar ht 6.6000 81,000.00 534,600.00
Kep.Tukang ht 1.3200 108,000.00 142,560.00
Mandor ht 0.4400 126,000.00 55,440.00
Jumlah.b 1,326,600.00
Jumlah.a+b 4,382,850.00

E1018 Kudakuda Exposed Kayu Borneo/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2500 1,950,000.00 2,437,500.00
Paku 12cm kg 5.0000 11,250.00 56,250.00
Baut Aisan Kap kg 25.0000 15,000.00 375,000.00
Jumlah.a 2,868,750.00
Upah
Kenek ht 6.6000 90,000.00 594,000.00
Tk.Kayu Kasar ht 6.6000 81,000.00 534,600.00
Kep.Tukang ht 1.3200 108,000.00 142,560.00
Mandor ht 0.4400 126,000.00 55,440.00
Jumlah.b 1,326,600.00
Jumlah.a+b 4,195,350.00

E1019 Gording Exposed Kayu Jati/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2000 30,450,000.00 36,540,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 36,573,750.00

528975646.xls
Page 158 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 4.4000 90,000.00 396,000.00
Tk.Kayu Kasar ht 4.4000 81,000.00 356,400.00
Kep.Tukang ht 0.8800 108,000.00 95,040.00
Mandor ht 0.2933 126,000.00 36,960.00
Jumlah.b 884,400.00
Jumlah.a+b 37,458,150.00

E1020 Gording Exposed Kayu Bangkirai/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2000 6,450,000.00 7,740,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 7,773,750.00
Upah
Kenek ht 4.4000 90,000.00 396,000.00
Tk.Kayu Kasar ht 4.4000 81,000.00 356,400.00
Kep.Tukang ht 0.8800 108,000.00 95,040.00
Mandor ht 0.2933 126,000.00 36,960.00
Jumlah.b 884,400.00
Jumlah.a+b 8,658,150.00

E1021 Gording Exposed Kayu Kamper Samarinda/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2000 5,550,000.00 6,660,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 6,693,750.00
Upah
Kenek ht 4.4000 90,000.00 396,000.00
Tk.Kayu Kasar ht 4.4000 81,000.00 356,400.00
Kep.Tukang ht 0.8800 108,000.00 95,040.00
Mandor ht 0.2933 126,000.00 36,960.00
Jumlah.b 884,400.00
Jumlah.a+b 7,578,150.00

E1022 Gording Exposed Kayu Kamper Medan/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2000 4,050,000.00 4,860,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 4,893,750.00
Upah
Kenek ht 4.4000 90,000.00 396,000.00
Tk.Kayu Kasar ht 4.4000 81,000.00 356,400.00
Kep.Tukang ht 0.8800 108,000.00 95,040.00
Mandor ht 0.2933 126,000.00 36,960.00
Jumlah.b 884,400.00
Jumlah.a+b 5,778,150.00

E1023 Gording Exposed Kayu Meranti/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2000 2,100,000.00 2,520,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 2,553,750.00
Upah
Kenek ht 4.4000 90,000.00 396,000.00
Tk.Kayu Kasar ht 4.4000 81,000.00 356,400.00
Kep.Tukang ht 0.8800 108,000.00 95,040.00
Mandor ht 0.2933 126,000.00 36,960.00
Jumlah.b 884,400.00
Jumlah.a+b 3,438,150.00

E1024 Gording Exposed Kayu Borneo/m3 Serut Mesin


Bahan
Balok Kayu m3 1.2000 1,950,000.00 2,340,000.00
Paku 10cm kg 3.0000 11,250.00 33,750.00
Jumlah.a 2,373,750.00
Upah
Kenek ht 4.4000 90,000.00 396,000.00
Tk.Kayu Kasar ht 4.4000 81,000.00 356,400.00
Kep.Tukang ht 0.8800 108,000.00 95,040.00
Mandor ht 0.2933 126,000.00 36,960.00
Jumlah.b 884,400.00
Jumlah.a+b 3,258,150.00

528975646.xls
Page 159 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1025 Plat+Angkur Baut dia 19mm Dudukan Kudakuda Baja/bh


Bahan
Plat Tebal 19mm 20x20cm kg 3.0000 7,500.00 22,500.00
Baut dia 19mm Panjang 25cm bh 2.0000 30,000.00 60,000.00
Las ls 1.0000 90,000.00 90,000.00
Meni Besi m2 0.0500 90,000.00 4,500.00
Jumlah.a 177,000.00
Upah Pasang
Kenek ht 0.7500 90,000.00 67,500.00
Tk.Batu Kasar ht 0.2500 108,000.00 27,000.00
Kep.Tukang ht 0.0500 108,000.00 5,400.00
Mandor ht 0.0167 126,000.00 2,100.00
Jumlah.b 102,000.00
Jumlah.a+b 279,000.00

E1026 Plat+Angkur Baut dia 16mm Dudukan Kudakuda Baja/bh


Bahan
Plat Tebal 16mm 20x20cm kg 2.0000 7,500.00 15,000.00
Baut dia 16mm Panjang 25cm bh 2.0000 22,500.00 45,000.00
Las ls 1.0000 90,000.00 90,000.00
Meni Besi m2 0.0500 90,000.00 4,500.00
Jumlah.a 154,500.00
Upah Pasang
Kenek ht 0.7500 90,000.00 67,500.00
Tk.Batu Kasar ht 0.2500 108,000.00 27,000.00
Kep.Tukang ht 0.0500 108,000.00 5,400.00
Mandor ht 0.0167 126,000.00 2,100.00
Jumlah.b 102,000.00
Jumlah.a+b 256,500.00

E1027 Plat+Angkur Baut dia 12mm Dudukan Kudakuda Baja/bh


Bahan
Plat Tebal 12mm 20x20cm kg 1.5000 7,500.00 11,250.00
Baut dia 12mm Panjang 25cm bh 2.0000 15,000.00 30,000.00
Las ls 1.0000 90,000.00 90,000.00
Meni Besi m2 0.0500 90,000.00 4,500.00
Jumlah.a 135,750.00
Upah Pasang
Kenek ht 0.7500 90,000.00 67,500.00
Tk.Batu Kasar ht 0.2500 108,000.00 27,000.00
Kep.Tukang ht 0.0500 108,000.00 5,400.00
Mandor ht 0.0167 126,000.00 2,100.00
Jumlah.b 102,000.00
Jumlah.a+b 237,750.00

E1028 Kudakuda Baja dgn WF/kg


Bahan
Baja WF kg 1.1000 9,000.00 9,900.00
Mata Gerinda bh 0.0050 30,000.00 150.00
Mata Bor bh 0.0050 22,500.00 112.50
Kawat Las kg 0.0020 75,000.00 150.00
Oksigen tbg 0.0020 112,500.00 225.00
Acetyline tbg 0.0020 240,000.00 480.00
Jumlah.a 11,017.50
Upah Buat
Kenek ht 0.0275 90,000.00 2,475.00
Tukang Besi ht 0.0275 99,000.00 2,722.50
Kep.Tukang ht 0.0092 108,000.00 990.00
Mandor ht 0.0031 126,000.00 385.00
Jumlah.b 6,572.50
Upah Erection
Transport kg 1.0000 110.18 110.18
Kenek ht 0.0150 90,000.00 1,350.00
Tukang Besi ht 0.0075 99,000.00 742.50
Kep.Tukang ht 0.0025 108,000.00 270.00
Mandor ht 0.0008 126,000.00 105.00
Jumlah.c 2,577.68
Jumlah.a+b+c 20,167.68

528975646.xls
Page 160 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1029 Kudakuda Baja dgn Siku/kg


Bahan
Baja Siku kg 1.1000 7,500.00 8,250.00
Mata Gerinda bh 0.0100 30,000.00 300.00
Mata Bor bh 0.0100 22,500.00 225.00
Kawat Las kg 0.0030 75,000.00 225.00
Oksigen tbg 0.0030 112,500.00 337.50
Acetyline tbg 0.0030 240,000.00 720.00
Jumlah.a 10,057.50
Upah Buat
Kenek ht 0.0300 90,000.00 2,700.00
Tukang Besi ht 0.0300 99,000.00 2,970.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 7,170.00
Upah Erection
Transport kg 1.0000 100.58 100.58
Kenek ht 0.0150 90,000.00 1,350.00
Tukang Besi ht 0.0075 99,000.00 742.50
Kep.Tukang ht 0.0025 108,000.00 270.00
Mandor ht 0.0008 126,000.00 105.00
Jumlah.c 2,568.08
Jumlah.a+b+c 19,795.58

E1030 Gording Baja Kanal C/kg


Bahan
Baja Kanal C kg 1.1000 7,500.00 8,250.00
Mata Gerinda bh 0.0025 30,000.00 75.00
Mata Bor bh 0.0025 22,500.00 56.25
Kawat Las kg 0.0025 75,000.00 187.50
Baut dia 12mm1" bh 0.1500 3,750.00 562.50
Oksigen tbg 0.0010 112,500.00 112.50
Acetyline tbg 0.0010 240,000.00 240.00
Jumlah.a 9,483.75
Upah Buat
Kenek ht 0.0200 90,000.00 1,800.00
Tukang Besi ht 0.0200 99,000.00 1,980.00
Kep.Tukang ht 0.0067 108,000.00 720.00
Mandor ht 0.0022 126,000.00 280.00
Jumlah.b 4,780.00
Upah Erection+Transport
Transport kg 1.0000 94.84 94.84
Kenek ht 0.0200 90,000.00 1,800.00
Tukang Besi ht 0.0100 99,000.00 990.00
Kep.Tukang ht 0.0033 108,000.00 360.00
Mandor ht 0.0011 126,000.00 140.00
Jumlah.c 3,384.84
Jumlah.a+b+c 17,648.59

E1031 Meni Besi/m2


Bahan
Meni kg 0.1428 22,500.00 3,213.00
Jumlah.a 3,213.00
Upah
Tukang Cat ht 0.0500 72,000.00 3,600.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 6,100.00
Alat
Amplas Besi lbr 0.5000 2,250.00 1,125.00
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Jumlah.c 2,250.00
Jumlah.a+b+c 11,563.00

E1032 Cat Besi/m2


Bahan
Plamur Besi kg 0.1000 15,000.00 1,500.00
Cat Dasar kg 0.1000 22,500.00 2,250.00
Cat Besi kg 0.2000 37,500.00 7,500.00
Jumlah.a 11,250.00

528975646.xls
Page 161 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tukang Cat ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.0667 108,000.00 7,200.00
Mandor ht 0.0222 126,000.00 2,800.00
Jumlah.b 24,400.00
Alat
Amplas Besi lbr 1.0000 2,250.00 2,250.00
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Jumlah.c 3,375.00
Jumlah.a+b+c 39,025.00

E1033 Pintu Besi Plat Tutup Man Hole/bh Uk.50x50cm


Bahan, Upah & Alat
Kosen Besi Siku 50x50x5 kg 9.0480 19,795.58 179,110.36
Rangka Pintu Besi Siku 30x30x3 kg 4.0800 19,795.58 80,765.95
Besi Plat T.2mm kg 4.0550 19,795.58 80,271.06
Besi Angkur Kosen dia 10mm kg 0.4936 13,546.25 6,686.43
Meni Besi Anti karat m2 0.7500 11,563.00 8,672.25
Cat Besi m2 0.7500 39,025.00 29,268.75
Jumlah.a+b+c 384,774.79

E1034 Pintu Besi Plat Tutup Man Hole/bh Uk.50x75cm


Bahan, Upah & Alat
Kosen Besi Siku 50x50x5 kg 10.9330 19,795.58 216,425.02
Rangka Pintu Besi Siku 30x30x3 kg 5.1000 19,795.58 100,957.43
Besi Plat T.2mm kg 6.0825 19,795.58 120,406.58
Besi Angkur Kosen dia 10mm kg 0.4936 13,546.25 6,686.43
Meni Besi Anti karat m2 1.1250 11,563.00 13,008.38
Cat Besi m2 1.1250 39,025.00 43,903.13
Jumlah.a+b+c 501,386.97

E1035 Pintu Besi Plat Tutup Man Hole/bh Uk.75x75cm


Bahan, Upah & Alat
Kosen Besi Siku 50x50x5 kg 12.8180 19,795.58 253,739.68
Rangka Pintu Besi Siku 30x30x3 kg 6.1200 19,795.58 121,148.92
Besi Plat T.2mm kg 9.1237 19,795.58 180,608.89
Besi Angkur Kosen dia 10mm kg 0.4936 13,546.25 6,686.43
Meni Besi Anti karat m2 1.6875 11,563.00 19,512.56
Cat Besi m2 1.6875 39,025.00 65,854.69
Jumlah.a+b+c 647,551.17

E1036 Pintu Besi Plat Tutup Man Hole/bh Uk.75x100cm


Bahan, Upah & Alat
Kosen Besi Siku 50x50x5 kg 14.7030 19,795.58 291,054.34
Rangka Pintu Besi Siku 30x30x3 kg 7.1400 19,795.58 141,340.41
Besi Plat T.2mm kg 12.1650 19,795.58 240,813.17
Besi Angkur Kosen dia 10mm kg 0.4936 13,546.25 6,686.43
Meni Besi Anti karat m2 2.2500 11,563.00 26,016.75
Cat Besi m2 2.2500 39,025.00 87,806.25
Jumlah.a+b+c 793,717.34

E1037 Pintu Besi Plat Tutup Man Hole/bh Uk.100x100cm


Bahan, Upah & Alat
Kosen Besi Siku 50x50x5 kg 16.5880 19,795.58 328,369.00
Rangka Pintu Besi Siku 30x30x3 kg 8.1600 19,795.58 161,531.89
Besi Plat T.2mm kg 16.2200 19,795.58 321,084.23
Besi Angkur Kosen dia 10mm kg 0.4936 13,546.25 6,686.43
Meni Besi Anti karat m2 3.0000 11,563.00 34,689.00
Cat Besi m2 3.0000 39,025.00 117,075.00
Jumlah.a+b+c 969,435.55

E1038 Rangka Atap Smartruss


Bahan, Upah & Alat m2 1.0000 262,500.00 262,500.00
Fee Koordinasi 10% m2 1.0000 26,250.00 26,250.00
Jumlah 288,750.00

E1039 Pas.Kaso Jati/m2


Bahan
Kaso 5/7 m3 0.0080 22,500,000.00 180,000.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 182,812.50

528975646.xls
Page 162 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1331 90,000.00 11,979.00
Tk.Kayu Kasar ht 0.0666 81,000.00 5,390.55
Kep.Tukang ht 0.0133 108,000.00 1,437.48
Mandor ht 0.0044 126,000.00 559.02
Jumlah.a 19,366.05
Jumlah.a+b 202,178.55

E1040 Pas.Kaso Bangkirai/m2


Bahan
Kaso 5/7 m3 0.0080 6,000,000.00 48,000.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 50,812.50
Upah
Kenek ht 0.1331 90,000.00 11,979.00
Tk.Kayu Kasar ht 0.0666 81,000.00 5,390.55
Kep.Tukang ht 0.0133 108,000.00 1,437.48
Mandor ht 0.0044 126,000.00 559.02
Jumlah.a 19,366.05
Jumlah.a+b 70,178.55

E1041 Pas.Kaso Kamper Samarinda/m2


Bahan
Kaso 5/7 m3 0.0080 5,250,000.00 42,000.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 44,812.50
Upah
Kenek ht 0.1331 90,000.00 11,979.00
Tk.Kayu Kasar ht 0.0666 81,000.00 5,390.55
Kep.Tukang ht 0.0133 108,000.00 1,437.48
Mandor ht 0.0044 126,000.00 559.02
Jumlah.a 19,366.05
Jumlah.a+b 64,178.55

E1042 Pas.Kaso Kamper Medan/m2


Bahan
Kaso 5/7 m3 0.0080 3,750,000.00 30,000.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 32,812.50
Upah
Kenek ht 0.1331 90,000.00 11,979.00
Tk.Kayu Kasar ht 0.0666 81,000.00 5,390.55
Kep.Tukang ht 0.0133 108,000.00 1,437.48
Mandor ht 0.0044 126,000.00 559.02
Jumlah.a 19,366.05
Jumlah.a+b 52,178.55

E1043 Pas.Kaso Meranti/m2


Bahan
Kaso 5/7 m3 0.0080 1,650,000.00 13,200.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 16,012.50
Upah
Kenek ht 0.1331 90,000.00 11,979.00
Tk.Kayu Kasar ht 0.0666 81,000.00 5,390.55
Kep.Tukang ht 0.0133 108,000.00 1,437.48
Mandor ht 0.0044 126,000.00 559.02
Jumlah.a 19,366.05
Jumlah.a+b 35,378.55

E1044 Pas.Kaso Borneo/m2


Bahan
Kaso 5/7 m3 0.0080 1,500,000.00 12,000.00
Paku 10cm kg 0.2500 11,250.00 2,812.50
Jumlah.a 14,812.50
Upah
Kenek ht 0.1331 90,000.00 11,979.00
Tk.Kayu Kasar ht 0.0666 81,000.00 5,390.55
Kep.Tukang ht 0.0133 108,000.00 1,437.48
Mandor ht 0.0044 126,000.00 559.02
Jumlah.a 19,366.05
Jumlah.a+b 34,178.55

528975646.xls
Page 163 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1045 Pas.Aluminium foil Single Side/m2


Bahan
Aluminium Folil m2 1.1000 11,250.00 12,375.00
Paku 5cm kg 0.0250 12,750.00 318.75
Jumlah.a 12,693.75
Upah
Kenek ht 0.0250 90,000.00 2,250.00
Tk.Kayu Kasar ht 0.0125 81,000.00 1,012.50
Kep.Tukang ht 0.0025 108,000.00 270.00
Mandor ht 0.0008 126,000.00 105.00
Jumlah.a 3,637.50
Jumlah.a+b 16,331.25

E1046 Pas.Aluminium foil Double Sided/m2


Bahan
Aluminium Folil m2 1.1000 15,000.00 16,500.00
Paku 5cm kg 0.0250 12,750.00 318.75
Jumlah.a 16,818.75
Upah
Kenek ht 0.0250 90,000.00 2,250.00
Tk.Kayu Kasar ht 0.0125 81,000.00 1,012.50
Kep.Tukang ht 0.0025 108,000.00 270.00
Mandor ht 0.0008 126,000.00 105.00
Jumlah.a 3,637.50
Jumlah.a+b 20,456.25

E1047 Pas.Reng Jati/m2


Bahan
Reng 3/4 m3 0.0060 30,000,000.00 180,000.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 180,510.00
Upah
Kenek ht 0.0750 90,000.00 6,750.00
Tk.Kayu Kasar ht 0.0375 81,000.00 3,037.50
Kep.Tukang ht 0.0075 108,000.00 810.00
Mandor ht 0.0025 126,000.00 315.00
Jumlah.b 10,912.50
Jumlah.a+b 191,422.50

E1048 Pas.Reng Bangkirai/m2


Bahan
Reng 3/4 m3 0.0060 6,000,000.00 36,000.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 36,510.00
Upah
Kenek ht 0.0750 90,000.00 6,750.00
Tk.Kayu Kasar ht 0.0375 81,000.00 3,037.50
Kep.Tukang ht 0.0075 108,000.00 810.00
Mandor ht 0.0025 126,000.00 315.00
Jumlah.b 10,912.50
Jumlah.a+b 47,422.50

E1049 Pas.Reng Kamper Samarinda/m2


Bahan
Reng 3/4 m3 0.0060 5,250,000.00 31,500.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 32,010.00
Upah
Kenek ht 0.0750 90,000.00 6,750.00
Tk.Kayu Kasar ht 0.0375 81,000.00 3,037.50
Kep.Tukang ht 0.0075 108,000.00 810.00
Mandor ht 0.0025 126,000.00 315.00
Jumlah.b 10,912.50
Jumlah.a+b 42,922.50

E1050 Pas.Reng Kamper Medan/m2


Bahan
Reng 3/4 m3 0.0060 3,750,000.00 22,500.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 23,010.00
Upah
Kenek ht 0.0750 90,000.00 6,750.00
Tk.Kayu Kasar ht 0.0375 81,000.00 3,037.50
Kep.Tukang ht 0.0075 108,000.00 810.00
Mandor ht 0.0025 126,000.00 315.00

528975646.xls
Page 164 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Jumlah.b 10,912.50
Jumlah.a+b 33,922.50

E1051 Pas.Reng Meranti/m2


Bahan
Reng 3/4 m3 0.0060 1,650,000.00 9,900.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 10,410.00
Upah
Kenek ht 0.0750 90,000.00 6,750.00
Tk.Kayu Kasar ht 0.0375 81,000.00 3,037.50
Kep.Tukang ht 0.0075 108,000.00 810.00
Mandor ht 0.0025 126,000.00 315.00
Jumlah.b 10,912.50
Jumlah.a+b 21,322.50

E1052 Pas.Reng Borneo/m2


Bahan
Reng 3/4 m3 0.0060 1,500,000.00 9,000.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 9,510.00

528975646.xls
Page 165 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.0750 90,000.00 6,750.00
Tk.Kayu Kasar ht 0.0375 81,000.00 3,037.50
Kep.Tukang ht 0.0075 108,000.00 810.00
Mandor ht 0.0025 126,000.00 315.00
Jumlah.b 10,912.50
Jumlah.a+b 20,422.50

E1053 Papan Nok Jati/m'


Bahan
Papan 3/20 m3 0.0066 24,000,000.00 158,400.00
Paku 5cm kg 0.0110 12,750.00 140.25
Jumlah.a 158,540.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 173,090.25

E1054 Papan Nok Bangkirai/m'


Bahan
Papan 3/20 m3 0.0066 6,750,000.00 44,550.00
Paku 5cm kg 0.0110 12,750.00 140.25
Jumlah.a 44,690.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 59,240.25

E1055 Papan Nok Kamper Samarinda/m'


Bahan
Papan 3/20 m3 0.0066 6,000,000.00 39,600.00
Paku 5cm kg 0.0110 12,750.00 140.25
Jumlah.a 39,740.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 54,290.25

E1056 Papan Nok Kamper Medan/m'


Bahan
Papan 3/20 m3 0.0066 4,500,000.00 29,700.00
Paku 5cm kg 0.0110 12,750.00 140.25
Jumlah.a 29,840.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 44,390.25

E1057 Papan Nok Meranti/m'


Bahan
Papan 3/20 m3 0.0066 1,875,000.00 12,375.00
Paku 5cm kg 0.0110 12,750.00 140.25
Jumlah.a 12,515.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 27,065.25

528975646.xls
Page 166 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1058 Papan Nok Borneo/m'


Bahan
Papan 3/20 m3 0.0066 1,650,000.00 10,890.00
Paku 5cm kg 0.0110 12,750.00 140.25
Jumlah.a 11,030.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 25,580.25

E1059 Papan Talang Datar Jati/m' L.20cm


Bahan
Papan 3/20 m3 0.0150 24,000,000.00 360,000.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 360,510.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 382,335.00

E1060 Papan Talang Datar Bangkirai/m' L.20cm


Bahan
Papan 3/20 m3 0.0150 6,750,000.00 101,250.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 101,760.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 123,585.00

E1061 Papan Talang Datar Kamper Samarinda/m' L.20cm


Bahan
Papan 3/20 m3 0.0150 6,000,000.00 90,000.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 90,510.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 112,335.00

E1062 Papan Talang Datar Kamper Medan/m' L.20cm


Bahan
Papan 3/20 m3 0.0150 4,500,000.00 67,500.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 68,010.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 89,835.00

E1063 Papan Talang Datar Kamper Meranti/m' L.20cm


Bahan
Papan 3/20 m3 0.0150 1,875,000.00 28,125.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 28,635.00

528975646.xls
Page 167 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 50,460.00

E1064 Papan Talang Datar Borneo/m' L.20cm


Bahan
Papan 3/20 m3 0.0150 1,650,000.00 24,750.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 25,260.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 47,085.00

E1065 Papan Talang Datar Jati/m' L.30cm


Bahan
Papan 3/20 m3 0.0225 24,000,000.00 540,000.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 540,510.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 569,610.00

E1066 Papan Talang Datar Bangkirai/m' L.30cm


Bahan
Papan 3/20 m3 0.0225 6,750,000.00 151,875.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 152,385.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 181,485.00

E1067 Papan Talang Datar Kamper Samarinda/m' L.30cm


Bahan
Papan 3/20 m3 0.0225 6,000,000.00 135,000.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 135,510.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 164,610.00

E1068 Papan Talang Datar Kamper Medan/m' L.30cm


Bahan
Papan 3/20 m3 0.0225 4,500,000.00 101,250.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 101,760.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 130,860.00

528975646.xls
Page 168 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1069 Papan Talang Datar Meranti/m' L.30cm


Bahan
Papan 3/20 m3 0.0225 1,875,000.00 42,187.50
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 42,697.50
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 71,797.50

E1070 Papan Talang Datar Borneo/m' L.30cm


Bahan
Papan 3/20 m3 0.0225 1,650,000.00 37,125.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 37,635.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 66,735.00

E1071 Papan Talang Jurai V/m' L.20+20cm Jati


Bahan
Papan 3/20 m3 0.0150 24,000,000.00 360,000.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 360,510.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 378,697.50

E1072 Papan Talang Jurai V/m' L.20+20cm Bangkirai


Bahan
Papan 3/20 m3 0.0150 6,750,000.00 101,250.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 101,760.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 119,947.50

E1073 Papan Talang Jurai V/m' L.20+20cm Kamper Samarinda


Bahan
Papan 3/20 m3 0.0150 6,000,000.00 90,000.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 90,510.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 108,697.50

E1074 Papan Talang Jurai V/m' L.20+20cm Kamper Medan


Bahan
Papan 3/20 m3 0.0150 4,500,000.00 67,500.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 68,010.00

528975646.xls
Page 169 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 86,197.50

E1075 Papan Talang Jurai V/m' L.20+20cm Meranti


Bahan
Papan 3/20 m3 0.0150 1,875,000.00 28,125.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 28,635.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 46,822.50

E1076 Papan Talang Jurai V/m' L.20+20cm Borneo


Bahan
Papan 3/20 m3 0.0150 1,650,000.00 24,750.00
Paku 5cm kg 0.0400 12,750.00 510.00
Jumlah.a 25,260.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 43,447.50

E1077 Papan Talang Jurai V/m' L.30+30cm Jati


Bahan
Papan 3/30 m3 0.0225 24,000,000.00 540,000.00
Paku 5cm kg 0.0600 12,750.00 765.00
Jumlah.a 540,765.00
Upah
Kenek ht 0.1563 90,000.00 14,067.00
Tk.Kayu Kasar ht 0.0782 81,000.00 6,330.15
Kep.Tukang ht 0.0156 108,000.00 1,688.04
Mandor ht 0.0052 126,000.00 656.46
Jumlah.b 22,741.65
Jumlah.a+b 563,506.65

E1078 Papan Talang Jurai V/m' L.30+30cm Bangkirai


Bahan
Papan 3/30 m3 0.0225 6,750,000.00 151,875.00
Paku 5cm kg 0.0600 12,750.00 765.00
Jumlah.a 152,640.00
Upah
Kenek ht 0.1563 90,000.00 14,067.00
Tk.Kayu Kasar ht 0.0782 81,000.00 6,330.15
Kep.Tukang ht 0.0156 108,000.00 1,688.04
Mandor ht 0.0052 126,000.00 656.46
Jumlah.b 22,741.65
Jumlah.a+b 175,381.65

E1079 Papan Talang Jurai V/m' L.30+30cm Kamper Samarinda


Bahan
Papan 3/30 m3 0.0225 6,000,000.00 135,000.00
Paku 5cm kg 0.0600 12,750.00 765.00
Jumlah.a 135,765.00
Upah
Kenek ht 0.1563 90,000.00 14,067.00
Tk.Kayu Kasar ht 0.0782 81,000.00 6,330.15
Kep.Tukang ht 0.0156 108,000.00 1,688.04
Mandor ht 0.0052 126,000.00 656.46
Jumlah.b 22,741.65
Jumlah.a+b 158,506.65

528975646.xls
Page 170 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1080 Papan Talang Jurai V/m' L.30+30cm Kamper Medan


Bahan
Papan 3/30 m3 0.0225 4,500,000.00 101,250.00
Paku 5cm kg 0.0600 12,750.00 765.00
Jumlah.a 102,015.00
Upah
Kenek ht 0.1563 90,000.00 14,067.00
Tk.Kayu Kasar ht 0.0782 81,000.00 6,330.15
Kep.Tukang ht 0.0156 108,000.00 1,688.04
Mandor ht 0.0052 126,000.00 656.46
Jumlah.b 22,741.65
Jumlah.a+b 124,756.65

E1081 Papan Talang Jurai V/m' L.30+30cm Meranti


Bahan
Papan 3/30 m3 0.0225 1,875,000.00 42,187.50
Paku 5cm kg 0.0600 12,750.00 765.00
Jumlah.a 42,952.50
Upah
Kenek ht 0.1563 90,000.00 14,067.00
Tk.Kayu Kasar ht 0.0782 81,000.00 6,330.15
Kep.Tukang ht 0.0156 108,000.00 1,688.04
Mandor ht 0.0052 126,000.00 656.46
Jumlah.b 22,741.65
Jumlah.a+b 65,694.15

E1082 Papan Talang Jurai V/m' L.30+30cm Borneo


Bahan
Papan 3/30 m3 0.0225 1,650,000.00 37,125.00
Paku 5cm kg 0.0600 12,750.00 765.00
Jumlah.a 37,890.00
Upah
Kenek ht 0.1563 90,000.00 14,067.00
Tk.Kayu Kasar ht 0.0782 81,000.00 6,330.15
Kep.Tukang ht 0.0156 108,000.00 1,688.04
Mandor ht 0.0052 126,000.00 656.46
Jumlah.b 22,741.65
Jumlah.a+b 60,631.65

E1083 Seng Talang Datar U.Talang L.20cm/m'


Bahan
Seng Plat L.45cm m' 0.5500 37,500.00 20,625.00
Paku 5cm kg 0.0400 12,750.00 510.00
Timah Patri kg 0.0500 52,500.00 2,625.00
Jumlah.a 23,760.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Seng ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 52,860.00

E1084 Seng Talang Datar U.Talang L.30cm/m'


Bahan
Seng Plat L.60cm m' 0.7330 37,500.00 27,487.50
Paku 5cm kg 0.0400 12,750.00 510.00
Timah Patri kg 0.0400 52,500.00 2,100.00
Jumlah.a 30,097.50
Upah
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Seng ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 43,650.00
Jumlah.a+b 73,747.50

528975646.xls
Page 171 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1085 Seng Talang Jurai V/m' L.20+20cm


Bahan
Seng Plat L.45cm m' 0.5500 37,500.00 20,625.00
Paku 5cm kg 0.0400 12,750.00 510.00
Timah Patri kg 0.0400 52,500.00 2,100.00
Jumlah.a 23,235.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Seng ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 29,100.00
Jumlah.a+b 52,335.00

E1086 Seng Talang Jurai V/m' L.30+30cm


Bahan
Seng Plat L.45cm m' 0.6999 37,500.00 26,246.25
Paku 5cm kg 0.0400 12,750.00 510.00
Timah Patri kg 0.0600 52,500.00 3,150.00
Jumlah.a 29,906.25
Upah
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Seng ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 43,650.00
Jumlah.a+b 73,556.25

E1087 Listplank Papan 2x20/m' Jati


Bahan
Papan m3 0.0048 24,000,000.00 115,200.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 115,761.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 135,861.00

E1088 Listplank Papan 2x20/m' Bangkirai


Bahan
Papan m3 0.0048 6,750,000.00 32,400.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 32,961.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 53,061.00

E1089 Listplank Papan 2x20/m' Kamper Samarinda


Bahan
Papan m3 0.0048 6,000,000.00 28,800.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 29,361.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 49,461.00

E1090 Listplank Papan 2x20/m' Kamper Medan


Bahan
Papan m3 0.0048 4,500,000.00 21,600.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 22,161.00

528975646.xls
Page 172 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 42,261.00

E1091 Listplank Papan 2x20/m' Meranti


Bahan
Papan m3 0.0048 1,875,000.00 9,000.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 9,561.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 29,661.00

E1092 Listplank Papan 2x20/m' Borneo


Bahan
Papan m3 0.0048 1,650,000.00 7,920.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 8,481.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 28,581.00

E1093 Listplank Papan 3x20/m' Jati


Bahan
Papan m3 0.0072 24,000,000.00 172,800.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 173,361.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 193,461.00

E1094 Listplank Papan 3x20/m' Bangkirai


Bahan
Papan m3 0.0072 6,750,000.00 48,600.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 49,161.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 69,261.00

E1095 Listplank Papan 3x20/m' Kamper Samarinda


Bahan
Papan m3 0.0072 6,000,000.00 43,200.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 43,761.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 63,861.00

528975646.xls
Page 173 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1096 Listplank Papan 3x20/m' Kamper Medan


Bahan
Papan m3 0.0072 4,500,000.00 32,400.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 32,961.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 53,061.00

E1097 Listplank Papan 3x20/m' Meranti


Bahan
Papan m3 0.0072 1,875,000.00 13,500.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 14,061.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 34,161.00

E1098 Listplank Papan 3x20/m' Borneo


Bahan
Papan m3 0.0072 1,650,000.00 11,880.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 12,441.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 32,541.00

E1099 Listplank Papan 3x30/m' Jati


Bahan
Papan m3 0.0108 24,000,000.00 259,200.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 259,761.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 279,861.00

E1100 Listplank Papan 3x30/m' Bangkirai


Bahan
Papan m3 0.0108 6,750,000.00 72,900.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 73,461.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 93,561.00

E1101 Listplank Papan 3x30/m' Kamper Samarinda


Bahan
Papan m3 0.0108 6,000,000.00 64,800.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 65,361.00

528975646.xls
Page 174 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 85,461.00

E1102 Listplank Papan 3x30/m' Kamper Medan


Bahan
Papan m3 0.0108 4,500,000.00 48,600.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 49,161.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 69,261.00

E1103 Listplank Papan 3x30/m' Meranti


Bahan
Papan m3 0.0108 1,875,000.00 20,250.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 20,811.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 40,911.00

E1104 Listplank Papan 3x30/m' Borneo


Bahan
Papan m3 0.0108 1,650,000.00 17,820.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 18,381.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.1000 81,000.00 8,100.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 20,100.00
Jumlah.a+b 38,481.00

E1105 Listplank Papan (2x20)+(2x10)/m' Jati


Bahan
Papan m3 0.0072 24,000,000.00 172,800.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 173,641.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 203,791.50

E1106 Listplank Papan (2x20)+(2x10)/m' Bangkirai


Bahan
Papan m3 0.0072 6,750,000.00 48,600.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 49,441.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 79,591.50

528975646.xls
Page 175 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1107 Listplank Papan (2x20)+(2x10)/m' Kamper Samarinda


Bahan
Papan m3 0.0072 6,000,000.00 43,200.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 44,041.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 74,191.50

E1108 Listplank Papan (2x20)+(2x10)/m' Kamper Medan


Bahan
Papan m3 0.0072 4,500,000.00 32,400.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 33,241.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 63,391.50

E1109 Listplank Papan (2x20)+(2x10)/m' Meranti


Bahan
Papan m3 0.0072 1,875,000.00 13,500.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 14,341.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 44,491.50

E1110 Listplank Papan (2x20)+(2x10)/m' Borneo


Bahan
Papan m3 0.0072 1,650,000.00 11,880.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 12,721.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 42,871.50

E1111 Listplank Papan 3x20+3x10/m' Jati


Bahan
Papan m3 0.0108 24,000,000.00 259,200.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 259,761.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 284,886.00

E1112 Listplank Papan 3x20+3x10/m' Bangkirai


Bahan
Papan m3 0.0108 6,750,000.00 72,900.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 73,461.00

528975646.xls
Page 176 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 98,586.00

E1113 Listplank Papan 3x20+3x10/m' Kamper Samarinda


Bahan
Papan m3 0.0108 6,000,000.00 64,800.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 65,361.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 90,486.00

E1114 Listplank Papan 3x20+3x10/m' Kamper Medan


Bahan
Papan m3 0.0108 4,500,000.00 48,600.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 49,161.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 74,286.00

E1115 Listplank Papan 3x20+3x10/m' Meranti


Bahan
Papan m3 0.0108 1,875,000.00 20,250.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 20,811.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 45,936.00

E1116 Listplank Papan 3x20+3x10/m' Borneo


Bahan
Papan m3 0.0108 1,650,000.00 17,820.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 18,381.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 43,506.00

E1117 Listplank Papan (3x30)+(3x10)/m' Jati


Bahan
Papan m3 0.0140 24,000,000.00 336,000.00
Paku 7cm kg 0.0572 12,750.00 729.30
Jumlah.a 336,729.30
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 361,854.30

528975646.xls
Page 177 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1118 Listplank Papan (3x30)+(3x10)/m' Bangkirai


Bahan
Papan m3 0.0140 6,750,000.00 94,500.00
Paku 7cm kg 0.0572 12,750.00 729.30
Jumlah.a 95,229.30
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 120,354.30

E1119 Listplank Papan (3x30)+(3x10)/m' Kamper Samarinda


Bahan
Papan m3 0.0140 6,000,000.00 84,000.00
Paku 7cm kg 0.0572 12,750.00 729.30
Jumlah.a 84,729.30
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 109,854.30

E1120 Listplank Papan (3x30)+(3x10)/m' Kamper Medan


Bahan
Papan m3 0.0140 4,500,000.00 63,000.00
Paku 7cm kg 0.0572 12,750.00 729.30
Jumlah.a 63,729.30
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 88,854.30

E1121 Listplank Papan (3x30)+(3x10)/m' Meranti


Bahan
Papan m3 0.0140 1,875,000.00 26,250.00
Paku 7cm kg 0.0572 12,750.00 729.30
Jumlah.a 26,979.30
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 52,104.30

E1122 Listplank Papan (3x30)+(3x10)/m' Borneo


Bahan
Papan m3 0.0140 1,650,000.00 23,100.00
Paku 7cm kg 0.0572 12,750.00 729.30
Jumlah.a 23,829.30
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.1250 81,000.00 10,125.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 25,125.00
Jumlah.a+b 48,954.30

E1123 Listplank Papan (3x30)+(3x15)/m' Jati


Bahan
Papan m3 0.0162 24,000,000.00 388,800.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 389,641.50

528975646.xls
Page 178 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 419,791.50

E1124 Listplank Papan (3x30)+(3x15)/m' Bangkirai


Bahan
Papan m3 0.0162 6,750,000.00 109,350.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 110,191.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 140,341.50

E1125 Listplank Papan (3x30)+(3x15)/m' Kamper Samarinda


Bahan
Papan m3 0.0162 6,000,000.00 97,200.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 98,041.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 128,191.50

E1126 Listplank Papan (3x30)+(3x15)/m' Kamper Medan


Bahan
Papan m3 0.0162 4,500,000.00 72,900.00
Paku 7cm kg 0.0440 12,750.00 561.00
Jumlah.a 73,461.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 103,611.00

E1127 Listplank Papan (3x30)+(3x15)/m' Meranti


Bahan
Papan m3 0.0162 1,875,000.00 30,375.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 31,216.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 61,366.50

E1128 Listplank Papan (3x30)+(3x15)/m' Borneo


Bahan
Papan m3 0.0162 1,650,000.00 26,730.00
Paku 7cm kg 0.0660 12,750.00 841.50
Jumlah.a 27,571.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.1500 81,000.00 12,150.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 30,150.00
Jumlah.a+b 57,721.50

528975646.xls
Page 179 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1129 Papan Flashing Atas Listplank Miring Papan 3x10cm/m' Jati


Bahan
Papan m3 0.0038 24,000,000.00 91,200.00
Paku 7cm kg 0.0220 12,750.00 280.50
Jumlah.a 91,480.50
Upah
Kenek ht 0.0575 90,000.00 5,175.00
Tk.Kayu Kasar ht 0.0575 81,000.00 4,657.50
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 11,557.50
Jumlah.a+b 103,038.00

E1130 Papan Flashing Atas Listplank Miring Papan 3x10cm/m' Bangkirai


Bahan
Papan m3 0.0038 6,750,000.00 25,650.00
Paku 7cm kg 0.0220 12,750.00 280.50
Jumlah.a 25,930.50
Upah
Kenek ht 0.0575 90,000.00 5,175.00
Tk.Kayu Kasar ht 0.0575 81,000.00 4,657.50
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 11,557.50
Jumlah.a+b 37,488.00

E1131 Papan Flashing Atas Listplank Miring Papan 3x10cm/m' Kamper Samarinda
Bahan
Papan m3 0.0038 6,000,000.00 22,800.00
Paku 7cm kg 0.0220 12,750.00 280.50
Jumlah.a 23,080.50
Upah
Kenek ht 0.0575 90,000.00 5,175.00
Tk.Kayu Kasar ht 0.0575 81,000.00 4,657.50
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 11,557.50
Jumlah.a+b 34,638.00

E1132 Papan Flashing Atas Listplank Miring Papan 3x10cm/m' Kamper Medan
Bahan
Papan m3 0.0038 4,500,000.00 17,100.00
Paku 7cm kg 0.0220 12,750.00 280.50
Jumlah.a 17,380.50
Upah
Kenek ht 0.0575 90,000.00 5,175.00
Tk.Kayu Kasar ht 0.0575 81,000.00 4,657.50
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 11,557.50
Jumlah.a+b 28,938.00

E1133 Papan Flashing Atas Listplank Miring Papan 3x10cm/m' Meranti


Bahan
Papan m3 0.0038 1,875,000.00 7,125.00
Paku 7cm kg 0.0220 12,750.00 280.50
Jumlah.a 7,405.50
Upah
Kenek ht 0.0575 90,000.00 5,175.00
Tk.Kayu Kasar ht 0.0575 81,000.00 4,657.50
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00
Jumlah.b 11,557.50
Jumlah.a+b 18,963.00

E1134 Papan Flashing Atas Listplank Miring Papan 3x10cm/m' Borneo


Bahan
Papan m3 0.0038 1,650,000.00 6,270.00
Paku 7cm kg 0.0220 12,750.00 280.50
Jumlah.a 6,550.50
Upah
Kenek ht 0.0575 90,000.00 5,175.00
Tk.Kayu Kasar ht 0.0575 81,000.00 4,657.50
Kep.Tukang ht 0.0115 108,000.00 1,242.00
Mandor ht 0.0038 126,000.00 483.00

528975646.xls
Page 180 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Jumlah.b 11,557.50
Jumlah.a+b 18,108.00

E1135 Seng Flashing Atas Papan Listplank Miring L.10>30cm/m'


Bahan
Seng Plat L.30cm m' 0.3150 37,500.00 11,812.50
Paku 5cm kg 0.0300 12,750.00 382.50
Timah Patri kg 0.0250 52,500.00 1,312.50
Jumlah.a 13,507.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Seng ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 28,057.50

E1136 Pas.Atap Asbes Gelombang Kecil/m2


Bahan
Asbes Gelombang Kecil m2 1.1000 22,500.00 24,750.00
Jumlah.a 24,750.00
Upah
Kenek ht 0.0750 90,000.00 6,750.00
Tk.Kayu Kasar ht 0.0375 81,000.00 3,037.50
Kep.Tukang ht 0.0075 108,000.00 810.00
Mandor ht 0.0025 126,000.00 315.00
Jumlah.b 10,912.50
Jumlah.a+b 35,662.50

E1137 Pas.Atap Asbes Gelombang Besar/m2


Bahan
Asbes Gelombang Kecil m2 1.1000 30,000.00 33,000.00
Jumlah.a 33,000.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 47,550.00

E1138 Pas.Genteng Kodok Bdn/m2


Bahan
Genteng Plentong bh 22.5000 1,875.00 42,187.50
Jumlah.a 42,187.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 56,737.50

E1139 Pas.Genteng Plentong Bdn/m2


Bahan
Genteng Plentong bh 25.0000 1,500.00 37,500.00
Jumlah.a 37,500.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 52,050.00

E1140 Pas.Genteng Beton Badan/m2 Type Besar


Bahan
Genteng Beton bh 9.0000 6,900.00 62,100.00
Jumlah.a 62,100.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 80,287.50

528975646.xls
Page 181 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1141 Pas.Genteng Beton Badan/m2 Type Kecil


Bahan
Genteng Beton bh 13.0000 6,750.00 87,750.00
Jumlah.a 87,750.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 105,937.50

528975646.xls
Page 182 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1142 Pas.Genteng Beton Badan/m2 Cisangkan Type Besar


Bahan
Genteng Beton bh 9.0000 10,725.00 96,525.00
Jumlah.a 96,525.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 114,712.50

E1143 Pas.Genteng Beton Badan/m2 Cisangkan Type Sedang


Bahan
Genteng Beton bh 10.0000 11,550.00 115,500.00
Jumlah.a 115,500.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 133,687.50

E1144 Pas.Genteng Beton Badan/m2 Cisangkan Type Kecil


Bahan
Genteng Beton bh 12.0000 8,775.00 105,300.00
Jumlah.a 105,300.00
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Kasar ht 0.0625 81,000.00 5,062.50
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,187.50
Jumlah.a+b 123,487.50

E1145 Pas.Genteng Keramik Badan/m2 Kanmuri Type Besar


Bahan
Genteng Keramik bh 13.9000 13,125.00 182,437.50
Jumlah.a 182,437.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 196,987.50

E1146 Pas.Genteng Keramik Badan/m2 Kanmuri Type Kecil


Bahan
Genteng Keramik bh 14.5000 12,000.00 174,000.00
Jumlah.a 174,000.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 188,550.00

E1146 Pas.Genteng Keramik Badan/m2 KIA


Bahan
Genteng Keramik bh 14.5000 13,500.00 195,750.00
Jumlah.a 195,750.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 210,300.00

E1147 Pas.Genteng Metal Badan/m2


Bahan
Genteng Metal m2 1.1000 135,000.00 148,500.00

528975646.xls
Page 183 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Jumlah.a 148,500.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 163,050.00

E1148 Pas.Genteng Badan Tegola/m2


Bahan
Genteng Tegola m2 1.0000 127,500.00 127,500.00
Jumlah.a 127,500.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 142,050.00

E1149 Pas.Nok Asbes Gelombang Kecil/m'


Bahan
Nok Asbes bh 1.1000 15,000.00 16,500.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 17,400.00
Upah
Kenek ht 0.0863 90,000.00 7,767.00
Tk.Kayu Kasar ht 0.0432 81,000.00 3,495.15
Kep.Tukang ht 0.0086 108,000.00 932.04
Mandor ht 0.0029 126,000.00 362.46
Jumlah.b 12,556.65

528975646.xls
Page 184 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Jumlah.a+b 29,956.65

E1150 Pas.Pertemuan Nok Asbes Gel.Kecil/bh 2 Arah L


Bahan
Nok Asbes bh 1.1000 22,500.00 24,750.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 25,650.00
Upah
Kenek ht 0.0863 90,000.00 7,767.00
Tk.Kayu Kasar ht 0.0432 81,000.00 3,495.15
Kep.Tukang ht 0.0086 108,000.00 932.04
Mandor ht 0.0029 126,000.00 362.46
Jumlah.b 12,556.65
Jumlah.a+b 38,206.65

E1151 Pas.Pertemuan Nok Asbes Gel.Kecil/bh 3 Arah T


Bahan
Nok Asbes bh 1.1000 30,000.00 33,000.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 33,900.00
Upah
Kenek ht 0.0863 90,000.00 7,767.00
Tk.Kayu Kasar ht 0.0432 81,000.00 3,495.15
Kep.Tukang ht 0.0086 108,000.00 932.04
Mandor ht 0.0029 126,000.00 362.46
Jumlah.b 12,556.65
Jumlah.a+b 46,456.65

E1152 Pas.Pertemuan Nok Asbes Gel.Kecil/bh 4 Arah +


Bahan
Nok Asbes bh 1.1000 45,000.00 49,500.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 50,400.00
Upah
Kenek ht 0.0863 90,000.00 7,767.00
Tk.Kayu Kasar ht 0.0432 81,000.00 3,495.15
Kep.Tukang ht 0.0086 108,000.00 932.04
Mandor ht 0.0029 126,000.00 362.46
Jumlah.b 12,556.65
Jumlah.a+b 62,956.65

E1153 Pas.Ujung Nok Asbes Gel.Kecil/bh


Bahan
Nok Asbes bh 1.1000 22,500.00 24,750.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 25,650.00
Upah
Kenek ht 0.1295 90,000.00 11,655.00
Tk.Kayu Kasar ht 0.0648 81,000.00 5,244.75
Kep.Tukang ht 0.0130 108,000.00 1,398.60
Mandor ht 0.0043 126,000.00 543.90
Jumlah.b 18,842.25
Jumlah.a+b 44,492.25

E1154 Pas.Nok Asbes Gel.Besar/m'


Bahan
Nok Asbes bh 1.1000 22,500.00 24,750.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 25,650.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 40,200.00

E1155 Pas.Pertemuan Nok Asbes Gel.Besar/bh 2 Arah L


Bahan
Nok Asbes bh 1.1000 30,000.00 33,000.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 33,900.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00

528975646.xls
Page 185 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 48,450.00

E1156 Pas.Pertemuan Nok Asbes Gel.Besar/bh 3 Arah T


Bahan
Nok Asbes bh 1.1000 37,500.00 41,250.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 42,150.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 56,700.00

E1157 Pas.Pertemuan Nok Asbes Gel.Besar/bh 4 Arah +


Bahan
Nok Asbes bh 1.1000 45,000.00 49,500.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 50,400.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Kasar ht 0.0500 81,000.00 4,050.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 14,550.00
Jumlah.a+b 64,950.00

E1158 Pas.Ujung Nok Asbes Gel.Besar/bh


Bahan
Nok Asbes bh 1.1000 30,000.00 33,000.00
Paku Asbes bh 4.0000 225.00 900.00
Jumlah.a 33,900.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Kasar ht 0.0750 81,000.00 6,075.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 21,825.00
Jumlah.a+b 55,725.00

E1159 Pas.Genteng Nok Kodok/m'


Bahan
Genteng Nok bh 3.5000 3,750.00 13,125.00
Spesie 1:6 m3 0.0300 588,000.00 17,640.00
Jumlah.a 30,765.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 54,615.00

E1160 Pas.Genteng Pertemuan Nok Kodok/bh 2 Arah L


Bahan
Genteng Nok bh 1.0000 15,000.00 15,000.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 20,880.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 44,730.00

E1161 Pas.Genteng Pertemuan Nok Kodok/bh 3 Arah T


Bahan
Genteng Nok bh 1.0000 22,500.00 22,500.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 28,380.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00

528975646.xls
Page 186 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 52,230.00

E1162 Pas.Genteng Pertemuan Nok Kodok/bh 4 Arah +


Bahan
Genteng Nok bh 1.0000 30,000.00 30,000.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 35,880.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 59,730.00

E1163 Pas.Genteng Ujung Nok Kodok/bh


Bahan
Genteng Nok bh 1.0000 15,000.00 15,000.00
Spesie 1:6 m3 0.0200 588,000.00 11,760.00
Jumlah.a 26,760.00
Upah
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Kasar ht 0.1125 108,000.00 12,150.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 35,775.00
Jumlah.a+b 62,535.00

E1164 Pas.Genteng Tepi Listplank Miring Kodok/m'


Bahan
Genteng Tepi bh 3.5000 7,500.00 26,250.00
Paku Sekrup 3" doos 0.1000 15,000.00 1,500.00
Jumlah.a 27,750.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 51,600.00

E1165 Pas.Genteng Nok Plentong/m'


Bahan
Genteng Nok bh 3.5000 3,750.00 13,125.00
Spesie 1:6 m3 0.0300 588,000.00 17,640.00
Jumlah.a 30,765.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 54,615.00

E1166 Pas.Genteng Pertemuan Nok Plentong/bh 2 Arah L


Bahan
Genteng Nok bh 1.0000 15,000.00 15,000.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 20,880.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 44,730.00

E1167 Pas.Genteng Pertemuan Nok Plentong/bh 3 Arah T


Bahan
Genteng Nok bh 1.0000 22,500.00 22,500.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 28,380.00

528975646.xls
Page 187 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 52,230.00

E1168 Pas.Genteng Pertemuan Nok Plentong/bh 4 Arah +


Bahan
Genteng Nok bh 1.0000 30,000.00 30,000.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 35,880.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 59,730.00

E1169 Pas.Genteng Ujung Nok Plentong/bh


Bahan
Genteng Nok bh 1.0000 15,000.00 15,000.00
Spesie 1:6 m3 0.0200 588,000.00 11,760.00
Jumlah.a 26,760.00
Upah
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Kasar ht 0.1125 108,000.00 12,150.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 35,775.00
Jumlah.a+b 62,535.00

E1170 Pas.Genteng Tepi Listplank Miring Plentong/m'


Bahan
Genteng Tepi bh 3.5000 7,500.00 26,250.00
Paku Sekrup 3" doos 0.1000 15,000.00 1,500.00
Jumlah.a 27,750.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 51,600.00

E1171 Pas.Genteng Nok Beton Cengkareng Permai/m'


Bahan
Genteng Nok bh 3.5000 6,750.00 23,625.00
Spesie 1:6 m3 0.0300 588,000.00 17,640.00
Jumlah.a 41,265.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 65,115.00

E1172 Pas.Genteng Pertemuan Nok Beton Cengkareng Permai/bh 2 Arah L


Bahan
Genteng Pertemuan L bh 1.0000 22,500.00 22,500.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 28,380.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 52,230.00

E1173 Pas.Genteng Pertemuan Nok Beton Cengkareng Permai/bh 3 Arah T


Bahan
Genteng Pertemuan T bh 1.0000 26,250.00 26,250.00

528975646.xls
Page 188 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 32,130.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 55,980.00

E1174 Pas.Genteng Pertemuan Nok Beton Cengkareng Permai/bh 4 Arah +


Bahan
Genteng Pertemuan + bh 1.0000 55,500.00 55,500.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 61,380.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 85,230.00

E1175 Pas.Genteng Ujung Nok Beton Cengkareng Permai/bh


Bahan
Genteng Ujung Nok bh 1.0000 55,500.00 55,500.00
Spesie 1:6 m3 0.0200 588,000.00 11,760.00
Jumlah.a 67,260.00
Upah
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Kasar ht 0.1125 108,000.00 12,150.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 35,775.00
Jumlah.a+b 103,035.00

E1176 Pas.Genteng Beton Tepi Listplank Miring Cengkareng Permai/m'


Bahan
Genteng Tepi bh 3.5000 26,250.00 91,875.00
Paku Sekrup 3" doos 0.1000 15,000.00 1,500.00
Jumlah.a 93,375.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 117,225.00

E1177 Pas.Genteng Nok Beton Cisangkan/m'


Bahan
Genteng Nok bh 3.5000 18,750.00 65,625.00
Spesie 1:6 m3 0.0300 588,000.00 17,640.00
Jumlah.a 83,265.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 107,115.00

E1178 Pas.Genteng Pertemuan Nok Beton Cisangkan/bh 2 Arah L


Bahan
Genteng Pertemuan L bh 1.0000 22,500.00 22,500.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 28,380.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 52,230.00

E1179 Pas.Genteng Pertemuan Nok Beton Cisangkan/bh 3 Arah T

528975646.xls
Page 189 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Bahan
Genteng Pertemuan T bh 1.0000 30,000.00 30,000.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 35,880.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 59,730.00

E1180 Pas.Genteng Pertemuan Nok Beton Cisangkan/bh 4 Arah +


Bahan
Genteng Pertemuan + bh 1.0000 60,000.00 60,000.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 65,880.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 89,730.00

E1181 Pas.Genteng Ujung Nok Beton Cisangkan/bh


Bahan
Genteng Ujung Nok bh 1.0000 30,000.00 30,000.00
Spesie 1:6 m3 0.0200 588,000.00 11,760.00
Jumlah.a 41,760.00
Upah
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Kasar ht 0.1125 108,000.00 12,150.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 35,775.00
Jumlah.a+b 77,535.00

E1182 Pas.Genteng Beton Tepi Listplank Miring Cisangkan/m'


Bahan
Genteng Tepi bh 3.5000 26,250.00 91,875.00
Paku Sekrup 3" doos 0.1000 15,000.00 1,500.00
Jumlah.a 93,375.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 117,225.00

E1183 Pas.Genteng Nok Keramik Kanmuri/m'


Bahan
Genteng Nok bh 3.5000 30,000.00 105,000.00
Spesie 1:6 m3 0.0300 588,000.00 17,640.00
Jumlah.a 122,640.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 146,490.00

E1184 Pas.Genteng Pertemuan Nok Keramik Kanmuri/bh 2 arah L


Bahan
Genteng Nok bh 1.0000 127,500.00 127,500.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 133,380.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 157,230.00

528975646.xls
Page 190 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1185 Pas.Genteng Pertemuan Nok Keramik Kanmuri/bh 3 Arah T


Bahan
Genteng Nok bh 1.0000 127,500.00 127,500.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 133,380.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 157,230.00

E1186 Pas.Genteng Pertemuan Nok Keramik Kanmuri/bh 4 Arah +


Bahan
Genteng Nok bh 1.0000 375,000.00 375,000.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 380,880.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 404,730.00

E1187 Pas.Genteng Nok Ujung Keramik Kanmuri/bh


Bahan
Genteng Nok bh 1.0000 103,500.00 103,500.00
Spesie 1:6 m3 0.0200 588,000.00 11,760.00
Jumlah.a 115,260.00
Upah
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Kasar ht 0.1125 108,000.00 12,150.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 35,775.00
Jumlah.a+b 151,035.00

E1187 Pas.Genteng Tepi Listplank Miring Keramik Kanmuri/m'


Bahan
Genteng Nok bh 3.5000 37,500.00 131,250.00
Paku Sekrup 3" doos 0.1000 15,000.00 1,500.00
Jumlah.a 132,750.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 156,600.00

E1188 Pas.Genteng Nok Keramik KIA/m'


Bahan
Genteng Nok bh 3.5000 32,250.00 112,875.00
Spesie 1:6 m3 0.0300 588,000.00 17,640.00
Jumlah.a 130,515.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 154,365.00

E1189 Pas.Genteng Pertemuan Nok Keramik KIA/bh 2 arah L


Bahan
Genteng Nok bh 1.0000 135,000.00 135,000.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 140,880.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00

528975646.xls
Page 191 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Jumlah.b 23,850.00
Jumlah.a+b 164,730.00

E1190 Pas.Genteng Pertemuan Nok Keramik KIA/bh 3 Arah T


Bahan
Genteng Nok bh 1.0000 135,000.00 135,000.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 140,880.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 164,730.00

E1191 Pas.Genteng Pertemuan Nok Keramik KIA/bh 4 Arah +


Bahan
Genteng Nok bh 1.0000 367,500.00 367,500.00
Spesie 1:6 m3 0.0100 588,000.00 5,880.00
Jumlah.a 373,380.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 397,230.00

E1192 Pas.Genteng Nok Ujung Keramik KIA/bh


Bahan
Genteng Nok bh 1.0000 99,000.00 99,000.00
Spesie 1:6 m3 0.0200 588,000.00 11,760.00
Jumlah.a 110,760.00
Upah
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Kasar ht 0.1125 108,000.00 12,150.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 35,775.00
Jumlah.a+b 146,535.00

E1192 Pas.Genteng Tepi Listplank Miring Keramik KIA/m'


Bahan
Genteng Nok bh 3.5000 37,500.00 131,250.00
Paku Sekrup 3" doos 0.1000 15,000.00 1,500.00
Jumlah.a 132,750.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 156,600.00

E1193 Pas.Genteng Nok Metal/m'


Bahan
Genteng Nok m' 1.1000 54,000.00 59,400.00
Paku Metal kg 0.0500 22,500.00 1,125.00
Jumlah.a 60,525.00

528975646.xls
Page 192 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 84,375.00

E1194 Pas.Genteng Pertemuan Nok Metal/bh 2 Arah L


Bahan
Genteng Nok m' 1.1000 108,000.00 118,800.00
Paku Metal kg 0.0500 22,500.00 1,125.00
Jumlah.a 119,925.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 143,775.00

E1195 Pas.Genteng Pertemuan Nok Metal/bh 3 Arah T


Bahan
Genteng Nok m' 1.1000 162,000.00 178,200.00
Paku Metal kg 0.0500 22,500.00 1,125.00
Jumlah.a 179,325.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 203,175.00

E1196 Pas.Genteng Pertemuan Nok Metal/bh 4 Arah +


Bahan
Genteng Nok m' 1.1000 216,000.00 237,600.00
Paku Metal kg 0.0500 22,500.00 1,125.00
Jumlah.a 238,725.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 262,575.00

E1197 Pas.Genteng Ujung Nok Metal/bh


Bahan
Genteng Nok m' 1.1000 37,500.00 41,250.00
Paku Metal kg 0.0500 22,500.00 1,125.00
Jumlah.a 42,375.00
Upah
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Kasar ht 0.1125 108,000.00 12,150.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 35,775.00
Jumlah.a+b 78,150.00

E1198 Pas.Genteng Nok Tegola/m'


Bahan
Genteng Nok tegola m' 1.1000 82,500.00 90,750.00
Paku kg 0.0500 22,500.00 1,125.00
Jumlah.a 91,875.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 115,725.00

E1199 Pas.Genteng Pertemuan Nok Tegola/bh 2 Arah L


Bahan
Genteng Nok tegola m' 1.1000 37,500.00 41,250.00

528975646.xls
Page 193 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Paku kg 0.0500 22,500.00 1,125.00
Jumlah.a 42,375.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 66,225.00

E1200 Pas.Genteng Pertemuan Nok Tegola/bh 3 Arah T


Bahan
Genteng Nok tegola m' 1.1000 52,500.00 57,750.00
Paku kg 0.0500 22,500.00 1,125.00
Jumlah.a 58,875.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 82,725.00

E1201 Pas.Genteng Pertemuan Nok Tegola/bh 4 Arah +


Bahan
Genteng Nok tegola m' 1.1000 82,500.00 90,750.00
Paku kg 0.0500 22,500.00 1,125.00
Jumlah.a 91,875.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 115,725.00

E1202 Pas.Genteng Ujung Nok Tegola/bh


Bahan
Genteng Nok tegola m' 1.1000 52,500.00 57,750.00
Paku kg 0.0500 22,500.00 1,125.00
Jumlah.a 58,875.00
Upah
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Kasar ht 0.1125 108,000.00 12,150.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 35,775.00
Jumlah.a+b 94,650.00

E1203 Canopy Transparant Rangka Besi Hitam Penutup Starlite/m2


Bahan+Upah+Alat m2 1.0000 195,000.00 195,000.00
Fee Koordinasi 10% ls 1.0000 19,500.00 19,500.00
Jumlah.abc+d 214,500.00

E1204 Canopy Transparant Rangka Besi Galvani Penutup Starlite/m2


Bahan+Upah+Alat m2 1.0000 202,500.00 202,500.00
Fee Koordinasi 10% ls 1.0000 20,250.00 20,250.00
Jumlah.abc+d 222,750.00

E1205 Canopy Transparant Rangka Besi St.Steel Penutup Starlite/m2


Bahan+Upah+Alat m2 1.0000 345,000.00 345,000.00
Fee Koordinasi 10% ls 1.0000 34,500.00 34,500.00
Jumlah.abc+d 379,500.00

E1206 Canopy Transparant Rangka Besi Hitam Penutup Twinlite/m2


Bahan+Upah+Alat m2 1.0000 270,000.00 270,000.00
Fee Koordinasi 10% ls 1.0000 27,000.00 27,000.00
Jumlah.abc+d 297,000.00

E1207 Canopy Transparant Rangka Besi Galvani Penutup Twinlite/m2


Bahan+Upah+Alat m2 1.0000 277,500.00 277,500.00
Fee Koordinasi 10% ls 1.0000 27,750.00 27,750.00
Jumlah.abc+d 305,250.00

E1208 Canopy Transparant Rangka Besi St.Steel Penutup Twinlite/m2


Bahan+Upah+Alat m2 1.0000 420,000.00 420,000.00

528975646.xls
Page 194 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Fee Koordinasi 10% ls 1.0000 42,000.00 42,000.00
Jumlah.abc+d 462,000.00

E1209 Canopy Transparant Rangka Besi Hitam Penutup Lexan/m2


Bahan+Upah+Alat m2 1.0000 330,000.00 330,000.00
Fee Koordinasi 10% ls 1.0000 33,000.00 33,000.00
Jumlah.abc+d 363,000.00

E1210 Canopy Transparant Rangka Besi Galvani Penutup Lexan/m2


Bahan+Upah+Alat m2 1.0000 337,500.00 337,500.00
Fee Koordinasi 10% ls 1.0000 33,750.00 33,750.00
Jumlah.abc+d 371,250.00

E1211 Canopy Transparant Rangka Besi St.Steel Penutup Lexan/m2


Bahan+Upah+Alat m2 1.0000 480,000.00 480,000.00
Fee Koordinasi 10% ls 1.0000 48,000.00 48,000.00
Jumlah.abc+d 528,000.00

E1212 Pipa Air Hujan PVC dia 2"/m' Klas AW


Bahan
Pipa PVC 2" btg 0.2750 37,500.00 10,312.50
Sok & Knie dia 2" bh 1.0000 4,500.00 4,500.00
Kawat Burung m2 0.2000 18,750.00 3,750.00
Jumlah.a 18,562.50

528975646.xls
Page 195 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Pipa ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 42,412.50

E1213 Pipa Air Hujan PVC dia 2,5"/m' Klas AW


Bahan
Pipa PVC 2" btg 0.2750 41,250.00 11,343.75
Sok & Knie dia 2" bh 1.0000 4,500.00 4,500.00
Kawat Burung m2 0.2000 18,750.00 3,750.00
Jumlah.a 19,593.75
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Pipa ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 43,443.75

E1214 Pipa Air Hujan PVC dia 3"/m' AW


Bahan
Pipa PVC 3" btg 0.2750 45,000.00 12,375.00
Sok & Knie dia 3" bh 1.0000 6,000.00 6,000.00
Kawat Burung m2 0.3000 18,750.00 5,625.00
Jumlah.a 24,000.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Pipa ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 55,800.00

E1215 Pipa Air Hujan PVC dia 4"/m' AW


Bahan
Pipa PVC 4" btg 0.2750 60,000.00 16,500.00
Knie /Sok dia 4" bh 1.0000 7,500.00 7,500.00
Kawat Burung m2 0.4000 18,750.00 7,500.00
Jumlah.a 31,500.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 108,000.00 13,500.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 39,750.00
Jumlah.a+b 71,250.00

E1216 Pipa Air Hujan PVC dia 5"/m' AW


Bahan
Pipa PVC 4" btg 0.2750 75,000.00 20,625.00
Knie /Sok dia 4" bh 1.0000 7,500.00 7,500.00
Kawat Burung m2 0.4000 18,750.00 7,500.00
Jumlah.a 35,625.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 108,000.00 13,500.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 39,750.00
Jumlah.a+b 75,375.00

E1217 Pipa Air Hujan PVC dia 6"/m' AW


Bahan
Pipa PVC 4" btg 0.2750 90,000.00 24,750.00
Knie /Sok dia 4" bh 1.0000 7,500.00 7,500.00
Kawat Burung m2 0.4000 18,750.00 7,500.00
Jumlah.a 39,750.00

528975646.xls
Page 196 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 108,000.00 13,500.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 39,750.00
Jumlah.a+b 79,500.00

E1218 Pipa Air Hujan PVC dia 2"/m' Klas D


Bahan
Pipa PVC 2" btg 0.2750 30,000.00 8,250.00
Sok & Knie dia 2" bh 1.0000 4,500.00 4,500.00
Kawat Burung m2 0.2000 18,750.00 3,750.00
Jumlah.a 16,500.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Pipa ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 40,350.00

E1219 Pipa Air Hujan PVC dia 2,5"/m' Klas D


Bahan
Pipa PVC 2" btg 0.2750 33,750.00 9,281.25
Sok & Knie dia 2" bh 1.0000 4,500.00 4,500.00
Kawat Burung m2 0.2000 18,750.00 3,750.00
Jumlah.a 17,531.25
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Pipa ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 41,381.25

E1220 Pipa Air Hujan PVC dia 3"/m' D


Bahan
Pipa PVC 3" btg 0.2750 41,250.00 11,343.75
Sok & Knie dia 3" bh 1.0000 6,000.00 6,000.00
Kawat Burung m2 0.3000 18,750.00 5,625.00
Jumlah.a 22,968.75
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Pipa ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 54,768.75

E1221 Pipa Air Hujan PVC dia 4"/m' D


Bahan
Pipa PVC 4" btg 0.2750 52,500.00 14,437.50
Knie /Sok dia 4" bh 1.0000 7,500.00 7,500.00
Kawat Burung m2 0.4000 18,750.00 7,500.00
Jumlah.a 29,437.50
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 108,000.00 13,500.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 39,750.00
Jumlah.a+b 69,187.50

E1222 Pipa Air Hujan PVC dia 5"/m' D


Bahan
Pipa PVC 5" btg 0.2750 67,500.00 18,562.50
Knie /Sok dia 5" bh 1.0000 7,500.00 7,500.00
Kawat Burung m2 0.4000 18,750.00 7,500.00
Jumlah.a 33,562.50

528975646.xls
Page 197 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 108,000.00 13,500.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 39,750.00
Jumlah.a+b 73,312.50

E1223 Pipa Air Hujan PVC dia 6"/m' D


Bahan
Pipa PVC 6" btg 0.2750 82,500.00 22,687.50
Knie /Sok dia 6" bh 1.0000 7,500.00 7,500.00
Kawat Burung m2 0.4000 18,750.00 7,500.00
Jumlah.a 37,687.50
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 108,000.00 13,500.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 39,750.00
Jumlah.a+b 77,437.50

E1224 Saringan Pipa Air Hujan Kuningan dia 2"/bh


Bahan
Saringan dia 2" Kuningan bh 1.0000 7,500.00 7,500.00
Jumlah.a 7,500.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 42,750.00

E1225 Saringan Pipa Air Hujan Kuningan dia 2,5"/bh


Bahan
Saringan dia 2,5" Kuningan bh 1.0000 11,250.00 11,250.00
Jumlah.a 11,250.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 46,500.00

E1226 Saringan Pipa Air Hujan Kuningan dia 3"/bh


Bahan
Saringan dia 3" Kuningan bh 1.0000 15,000.00 15,000.00
Jumlah.a 15,000.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 50,250.00

E1227 Saringan Pipa Air Hujan Kuningan dia 4"/bh


Bahan
Saringan dia 4" Kuningan bh 1.0000 22,500.00 22,500.00
Jumlah.a 22,500.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 57,750.00

528975646.xls
Page 198 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1228 Saringan Pipa Air Hujan Kuningan dia 5"/bh


Bahan
Saringan dia 5" Kuningan bh 1.0000 30,000.00 30,000.00
Jumlah.a 30,000.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 65,250.00

E1229 Saringan Pipa Air Hujan Kuningan dia 6"/bh


Bahan
Saringan dia 6" Kuningan bh 1.0000 37,500.00 37,500.00
Jumlah.a 37,500.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 72,750.00

E1230 Saringan Pipa Air Hujan St.Steel dia 2"/bh


Bahan
Saringan dia 2" St.Steel bh 1.0000 15,000.00 15,000.00
Jumlah.a 15,000.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 50,250.00

E1231 Saringan Pipa Air Hujan St.Steel dia 2,5"/bh


Bahan
Saringan dia 2,5" St.Steel bh 1.0000 22,500.00 22,500.00
Jumlah.a 22,500.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 57,750.00

E1232 Saringan Pipa Air Hujan St.Steel dia 3"/bh


Bahan
Saringan dia 3" St.Steel bh 1.0000 30,000.00 30,000.00
Jumlah.a 30,000.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 65,250.00

E1233 Saringan Pipa Air Hujan St.Steel dia 4"/bh


Bahan
Saringan dia 4" St.Steel bh 1.0000 45,000.00 45,000.00
Jumlah.a 45,000.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 80,250.00

528975646.xls
Page 199 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

E1234 Saringan Pipa Air Hujan St.Steel dia 5"/bh


Bahan
Saringan dia 5" St.Steel bh 1.0000 60,000.00 60,000.00
Jumlah.a 60,000.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 95,250.00

E1235 Saringan Pipa Air Hujan St.Steel dia 6"/bh


Bahan
Saringan dia 6" St.Steel bh 1.0000 75,000.00 75,000.00
Jumlah.a 75,000.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 35,250.00
Jumlah.a+b 110,250.00

E1236 Plesteran kemiringan Dak Beton 1:3/m2 T.Ratarata 2cm


Bahan
Spesi 1:3 m3 0.0220 686,250.00 15,097.50
Jumlah.a 15,097.50
Upah Pasang
Kenek ht 0.2875 90,000.00 25,875.00
Tk.Batu Halus ht 0.1438 90,000.00 12,937.50
Kep.Tukang ht 0.0288 108,000.00 3,105.00
Mandor ht 0.0096 126,000.00 1,207.50
Jumlah.b 43,125.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 60,222.50

E1237 Plesteran kemiringan Dak Beton 1:3/m2 T.Ratarata 3cm


Bahan
Spesi 1:3 m3 0.0330 686,250.00 22,646.25
Jumlah.a 22,646.25
Upah Pasang
Kenek ht 0.4313 90,000.00 38,817.00
Tk.Batu Halus ht 0.2157 90,000.00 19,408.50
Kep.Tukang ht 0.0431 108,000.00 4,658.04
Mandor ht 0.0144 126,000.00 1,811.46
Jumlah.b 64,695.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 89,341.25

PEK.PELAPIS DINDING

Lantai1
F1001 Plesteran Bata 1:3/m2 T.1,52cm
Bahan
Spesi 1:3 m3 0.0220 686,250.00 15,097.50
Jumlah.a 15,097.50
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00

528975646.xls
Page 200 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 47,097.50

F1002 Plesteran Bata 1:4/m2 T.1,52cm


Bahan
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Jumlah.a 14,223.00
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 46,223.00

F1003 Plesteran Bata 1:5/m2 T.1,52cm


Bahan
Spesi 1:5 m3 0.0220 617,250.00 13,579.50
Jumlah.a 13,579.50
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00

528975646.xls
Page 201 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 45,579.50

F1004 Plesteran Bata 1:5/m2 T.1,52cm Sopisopi


Bahan
Spesi 1:5 m3 0.0220 617,250.00 13,579.50
Jumlah.a 13,579.50
Upah Pasang
Kenek ht 0.2300 90,000.00 20,700.00
Tk.Batu Halus ht 0.1150 90,000.00 10,350.00
Kep.Tukang ht 0.0230 108,000.00 2,484.00
Mandor ht 0.0077 126,000.00 966.00
Jumlah.b 34,500.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 50,079.50

F1005 Plesteran Bata 1:6/m2 T.1,52cm


Bahan
Spesi 1:6 m3 0.0220 588,000.00 12,936.00
Jumlah.a 12,936.00
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 44,936.00

F1006 Plesteran Bata 1:6/m2 T.1,52cm Sopisopi


Bahan
Spesi 1:6 m3 0.0220 588,000.00 12,936.00
Jumlah.a 12,936.00
Upah Pasang
Kenek ht 0.2300 90,000.00 20,700.00
Tk.Batu Halus ht 0.1150 90,000.00 10,350.00
Kep.Tukang ht 0.0230 108,000.00 2,484.00
Mandor ht 0.0077 126,000.00 966.00
Jumlah.b 34,500.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 49,436.00

F1007 Plesteran Beton 1:3/m2 T.1,52cm


Bahan
Spesi 1:3 m3 0.0220 686,250.00 15,097.50
Jumlah.a 15,097.50
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 54,597.50

F1008 Plesteran Beton 1:4/m2 T.1,52cm

528975646.xls
Page 202 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Bahan
Spesi 1:3 m3 0.0220 646,500.00 14,223.00
Jumlah.a 14,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 53,723.00

F1009 Plesteran Bata 1:3/m2 T.23cm


Bahan
Spesi 1:3 m3 0.0330 686,250.00 22,646.25
Jumlah.a 22,646.25
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00

528975646.xls
Page 203 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 69,646.25

F1010 Plesteran Bata 1:4/m2 T.23cm


Bahan
Spesi 1:4 m3 0.0330 646,500.00 21,334.50
Jumlah.a 21,334.50
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 68,334.50

F1011 Plesteran Bata 1:5/m2 T.23cm


Bahan
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Jumlah.a 20,369.25
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 67,369.25

F1012 Plesteran Bata 1:5/m2 T.23cm Sopisopi


Bahan
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Jumlah.a 20,369.25
Upah Pasang
Kenek ht 0.3450 90,000.00 31,050.00
Tk.Batu Halus ht 0.1725 90,000.00 15,525.00
Kep.Tukang ht 0.0345 108,000.00 3,726.00
Mandor ht 0.0115 126,000.00 1,449.00
Jumlah.b 51,750.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 74,119.25

F1013 Plesteran Bata 1:6/m2 T.23cm


Bahan
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Jumlah.a 19,404.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 66,404.00

F1014 Plesteran Bata 1:6/m2 T.23cm Sopisopi

528975646.xls
Page 204 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Bahan
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Jumlah.a 19,404.00
Upah Pasang
Kenek ht 0.3450 90,000.00 31,050.00
Tk.Batu Halus ht 0.1725 90,000.00 15,525.00
Kep.Tukang ht 0.0345 108,000.00 3,726.00
Mandor ht 0.0115 126,000.00 1,449.00
Jumlah.b 51,750.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 73,154.00

F1015 Plesteran Beton 1:3/m2 T.23cm


Bahan
Spesi 1:3 m3 0.0330 686,250.00 22,646.25
Jumlah.a 22,646.25
Upah Pasang
Kenek ht 0.3750 90,000.00 33,750.00
Tk.Batu Halus ht 0.1875 90,000.00 16,875.00
Kep.Tukang ht 0.0375 108,000.00 4,050.00
Mandor ht 0.0125 126,000.00 1,575.00
Jumlah.b 56,250.00

528975646.xls
Page 205 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 80,896.25

F1016 Plesteran Beton 1:4/m2 T.23cm


Bahan
Spesi 1:3 m3 0.0330 646,500.00 21,334.50
Jumlah.a 21,334.50
Upah Pasang
Kenek ht 0.3750 90,000.00 33,750.00
Tk.Batu Halus ht 0.1875 90,000.00 16,875.00
Kep.Tukang ht 0.0375 108,000.00 4,050.00
Mandor ht 0.0125 126,000.00 1,575.00
Jumlah.b 56,250.00
Alat Bantu
Ember bh 0.0500 10,000.00 500.00
Pacul bh 0.0100 50,000.00 500.00
Sekop bh 0.0100 100,000.00 1,000.00
Jumlah.c 2,000.00
Jumlah.a+b+c 79,584.50

F1017 Acian Plesteran Tebal 12mm/m2


Bahan
Semen sak 0.0550 52,500.00 2,887.50
Jumlah.a 2,887.50
Upah Aci
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.0667 90,000.00 6,000.00
Kep.Tukang ht 0.0133 108,000.00 1,440.00
Mandor ht 0.0044 126,000.00 560.00
Jumlah.b 26,000.00
Jumlah.a+b 28,887.50

F1018 Acian Plesteran Tebal 23mm/m2


Bahan
Semen sak 0.0770 52,500.00 4,042.50
Jumlah.a 4,042.50
Upah Aci
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.0667 90,000.00 6,000.00
Kep.Tukang ht 0.0133 108,000.00 1,440.00
Mandor ht 0.0044 126,000.00 560.00
Jumlah.b 26,000.00
Jumlah.a+b 30,042.50

F1019 Sekonengan Sudut Dinding/m'


Bahan
Semen sak 0.0825 52,500.00 4,331.25
Jumlah.a 4,331.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Halus ht 0.0333 90,000.00 3,000.00
Kep.Tukang ht 0.0067 108,000.00 720.00
Mandor ht 0.0022 126,000.00 280.00
Jumlah.b 13,000.00
Jumlah.a+b 17,331.25

F1020 Tali Air Keliling Kosen/m'


Bahan
Semen sak 0.0550 52,500.00 2,887.50
Jumlah.a 2,887.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Halus ht 0.0333 90,000.00 3,000.00
Kep.Tukang ht 0.0067 108,000.00 720.00
Mandor ht 0.0022 126,000.00 280.00
Jumlah.b 13,000.00
Jumlah.a+b 15,887.50

528975646.xls
Page 206 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1021 Tali Air Lekuk Dinding/m'


Bahan
Semen sak 0.1100 52,500.00 5,775.00
Jumlah.a 5,775.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0500 90,000.00 4,500.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 19,500.00
Jumlah.a+b 25,275.00

F1022 Plesteran Dudukan Kosen Alum/m'


Bahan
Spesi 1:3 m3 0.0150 646,500.00 9,697.50
Jumlah.a 9,697.50
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.0250 10,000.00 250.00
Pacul bh 0.0050 50,000.00 250.00
Sekop bh 0.0050 100,000.00 500.00
Jumlah.c 1,000.00
Jumlah.a+b+c 33,197.50

F1023 Pas.Granit Dinding Import 60x60/m2 Italia


Bahan
Granit Import 60x60cm m2 1.1000 1,125,000.00 1,237,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,259,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 1,299,623.00

F1024 Pas.Granit Dinding Import 50x50/m2 Italia


Bahan
Granit Import 50x50cm m2 1.1000 900,000.00 990,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,011,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 1,052,123.00

528975646.xls
Page 207 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1025 Pas.Granit Dinding Import 40x40/m2 Italia


Bahan
Granit Import 40x40cm m2 1.1000 750,000.00 825,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 846,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 887,123.00

F1026 Pas.Granit Dinding Import 30x30/m2 Italia


Bahan
Granit Import 30x30cm m2 1.1000 675,000.00 742,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 764,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 804,623.00

F1027 Pas.Granit Dinding Import 60x60/m2 RRC


Bahan
Granit Import 60x60cm m2 1.1000 900,000.00 990,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,011,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 1,052,123.00

F1028 Pas.Granit Dinding Import 50x50/m2 RRC


Bahan
Granit Import 50x50cm m2 1.1000 750,000.00 825,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 846,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00

528975646.xls
Page 208 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 887,123.00

F1029 Pas.Granit Dinding Import 40x40/m2 RRC


Bahan
Granit Import 40x40cm m2 1.1000 600,000.00 660,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 681,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 722,123.00

F1030 Pas.Granit Dinding Import 30x30/m2 RRC


Bahan
Granit Import 30x30cm m2 1.1000 450,000.00 495,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 516,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 557,123.00

F1031 Pas.Granit Dinding Lokal 60x60/m2 Granito


Bahan
Granit Lokal 60x60cm m2 1.1000 450,000.00 495,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 516,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 557,123.00

F1032 Pas.Granit Dinding Lokal 50x50/m2 Granito


Bahan
Granit Lokal 50x50cm m2 1.1000 375,000.00 412,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 434,223.00

528975646.xls
Page 209 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 474,623.00

F1033 Pas.Granit Dinding Lokal 40x40/m2 Granito


Bahan
Granit Lokal 40x40cm m2 1.1000 300,000.00 330,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 351,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 392,123.00

F1034 Pas.Granit Dinding Lokal 30x30/m2 Granito


Bahan
Granit Lokal 30x30cm m2 1.1000 225,000.00 247,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 269,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 309,623.00

F1035 Pas.Marmer Dinding Import 60x60/m2 Italia


Bahan
Marmer Import 60x60cm m2 1.1000 1,050,000.00 1,155,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,176,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 1,217,123.00

528975646.xls
Page 210 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1036 Pas.Marmer Dinding Import 50x50/m2 Italia


Bahan
Marmer Import 50x50cm m2 1.1000 900,000.00 990,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,011,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 1,052,123.00

F1037 Pas.Marmer Dinding Import 40x40/m2 Italia


Bahan
Marmer Import 40x40cm m2 1.1000 750,000.00 825,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 846,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 887,123.00

F1038 Pas.Marmer Dinding Import 30x30/m2 Italia


Bahan
Marmer Import 30x30cm m2 1.1000 600,000.00 660,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 681,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 722,123.00

F1039 Pas.Marmer Dinding Import 60x60/m2 RRC


Bahan
Marmer Import 60x60cm m2 1.1000 975,000.00 1,072,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,094,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00

528975646.xls
Page 211 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 1,134,623.00

F1040 Pas.Marmer Dinding Import 50x50/m2 RRC


Bahan
Marmer Import 50x50cm m2 1.1000 750,000.00 825,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 846,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 887,123.00

F1041 Pas.Marmer Dinding Import 40x40/m2 RRC


Bahan
Marmer Import 40x40cm m2 1.1000 600,000.00 660,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 681,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 722,123.00

F1042 Pas.Marmer Dinding Import 30x30/m2 RRC


Bahan
Marmer Import 30x30cm m2 1.1000 450,000.00 495,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 516,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 557,123.00

F1043 Pas.Marmer Dinding Lokal 60x60/m2 ex.Bangun Lampung Jaya


Bahan
Marmer Lokal 60x60cm m2 1.1000 600,000.00 660,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 681,723.00

528975646.xls
Page 212 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 722,123.00

F1044 Pas.Marmer Dinding Lokal 50x50/m2 ex.BLJ


Bahan
Marmer Lokal 50x50cm m2 1.1000 450,000.00 495,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 516,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 557,123.00

F1045 Pas.Marmer Dinding Lokal 40x40/m2 ex.BLJ


Bahan
Marmer Lokal 40x40cm m2 1.1000 375,000.00 412,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 434,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 474,623.00

F1046 Pas.Marmer Dinding Lokal 30x30/m2 ex.BLJ


Bahan
Marmer Lokal 30x30cm m2 1.1000 300,000.00 330,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 351,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 392,123.00

528975646.xls
Page 213 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1047 Pas.Marmer Dinding Lokal 60x60/m2 ex.Citatah


Bahan
Marmer Lokal 60x60cm m2 1.1000 525,000.00 577,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 599,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 639,623.00

F1048 Pas.Marmer Dinding Lokal 50x50/m2 ex.Citatah


Bahan
Marmer Lokal 50x50cm m2 1.1000 375,000.00 412,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 434,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 474,623.00

F1049 Pas.Marmer Dinding Lokal 40x40/m2 ex.Citatah


Bahan
Marmer Lokal 40x40cm m2 1.1000 300,000.00 330,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 351,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 392,123.00

F1050 Pas.Marmer Dinding Lokal 30x30/m2 ex.Citatah


Bahan
Marmer Lokal 30x30cm m2 1.1000 225,000.00 247,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 269,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00

528975646.xls
Page 214 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 309,623.00

F1051 Pas.Marmer Dinding Lokal 60x60/m2 ex.Indoprima


Bahan
Marmer Lokal 60x60cm m2 1.1000 487,500.00 536,250.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 557,973.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 598,373.00

F1052 Pas.Marmer Dinding Lokal 50x50/m2 ex.Indoprima


Bahan
Marmer Lokal 50x50cm m2 1.1000 337,500.00 371,250.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 392,973.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 433,373.00

F1053 Pas.Marmer Dinding Lokal 40x40/m2 ex.Indoprima


Bahan
Marmer Lokal 40x40cm m2 1.1000 262,500.00 288,750.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 310,473.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 350,873.00

F1054 Pas.Marmer Dinding Lokal 30x30/m2 ex.Indoprima


Bahan
Marmer Lokal 30x30cm m2 1.1000 187,500.00 206,250.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 227,973.00

528975646.xls
Page 215 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 268,373.00

F1055 Pas.Marmer Dinding Lokal 60x60/m2 ex.Pola Marmer


Bahan
Marmer Lokal 60x60cm m2 1.1000 450,000.00 495,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 516,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 557,123.00

F1056 Pas.Marmer Dinding Lokal 50x50/m2 ex.Pola Marmer


Bahan
Marmer Lokal 50x50cm m2 1.1000 375,000.00 412,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 434,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 474,623.00

F1057 Pas.Marmer Dinding Lokal 40x40/m2 ex.Pola Marmer


Bahan
Marmer Lokal 40x40cm m2 1.1000 300,000.00 330,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 351,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 392,123.00

528975646.xls
Page 216 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1058 Pas.Marmer Dinding Lokal 30x30/m2 ex.Pola Marmer


Bahan
Marmer Lokal 30x30cm m2 1.1000 225,000.00 247,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 269,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 309,623.00

F1059 Pas.Marmer Dinding Lokal 60x60/m2 ex.Ujung Pandang


Bahan
Marmer Lokal 60x60cm m2 1.1000 562,500.00 618,750.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 640,473.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 680,873.00

F1060 Pas.Marmer Dinding Lokal 50x50/m2 ex.Ujung Pandang


Bahan
Marmer Lokal 50x50cm m2 1.1000 412,500.00 453,750.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 475,473.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 515,873.00

F1061 Pas.Marmer Dinding Lokal 40x40/m2 ex.Ujung Pandang


Bahan
Marmer Lokal 40x40cm m2 1.1000 337,500.00 371,250.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 392,973.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00

528975646.xls
Page 217 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 433,373.00

F1062 Pas.Marmer Dinding Lokal 30x30/m2 ex.Ujung Pandang


Bahan
Marmer Lokal 30x30cm m2 1.1000 262,500.00 288,750.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 310,473.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 350,873.00

F1063 Pas.Keramik Dinding Import 60x60/m2 Milan


Bahan
Keramik Import 60x60cm m2 1.1000 300,000.00 330,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 351,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 392,123.00

F1064 Pas.Keramik Dinding Import 50x50/m2 Milan


Bahan
Keramik Import 60x60cm m2 1.1000 262,500.00 288,750.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 310,473.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 350,873.00

F1065 Pas.Keramik Dinding Import 40x40/m2 Milan


Bahan
Keramik Import 40x40cm m2 1.1000 225,000.00 247,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 269,223.00

528975646.xls
Page 218 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 309,623.00

F1066 Pas.Keramik Dinding Import 30x30/m2 Milan


Bahan
Keramik Import 30x30cm m2 1.1000 150,000.00 165,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 186,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 227,123.00

F1067 Pas.Keramik Dinding Import 20x25/m2 Milan


Bahan
Keramik Import 20x25cm m2 1.1000 112,500.00 123,750.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 145,473.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 185,873.00

F1068 Pas.Keramik Dinding Import 20x20/m2 Milan


Bahan
Keramik Import 20x20cm m2 1.1000 90,000.00 99,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 120,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 161,123.00

528975646.xls
Page 219 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1069 Pas.Keramik Dinding Import 10x20/m2 Milan


Bahan
Keramik Import 10x20cm m2 1.1000 75,000.00 82,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 104,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 144,623.00

F1070 Pas.Keramik Dinding Lokal 60X60/m2 Essenza


Bahan
Keramik 60X60 Essenza m2 1.1000 375,000.00 412,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 434,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 482,123.00

F1071 Pas.Keramik Dinding Lokal 50X50/m2 Essenza


Bahan
Keramik 50X50 Essenza m2 1.1000 337,500.00 371,250.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 392,973.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 440,873.00

F1072 Pas.Keramik Dinding Lokal 40X40/m2 Essenza


Bahan
Keramik 40X40 Essenza m2 1.1000 300,000.00 330,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 351,723.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00

528975646.xls
Page 220 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 399,623.00

F1073 Pas.Keramik Dinding Lokal 30X30/m2 Essenza


Bahan
Keramik 30X30 Essenza m2 1.1000 262,500.00 288,750.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 310,473.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 358,373.00

F1074 Pas.Keramik Dinding Lokal 20X25/m2 Essenza


Bahan
Keramik 20X25 Essenza m2 1.1000 225,000.00 247,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 269,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 317,123.00

F1075 Pas.Keramik Dinding Lokal 20X20/m2 Essenza


Bahan
Keramik 20X20 Essenza m2 1.1000 187,500.00 206,250.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 227,973.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 275,873.00

F1076 Pas.Keramik Dinding Lokal 10X20/m2 Essenza


Bahan
Keramik 10X20 Essenza m2 1.1000 150,000.00 165,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 186,723.00

528975646.xls
Page 221 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 234,623.00

F1077 Pas.Keramik Dinding Lokal 60X60/m2 Ikad


Bahan
Keramik 60X60 Ikad m2 1.1000 150,000.00 165,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 186,723.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 234,623.00

F1078 Pas.Keramik Dinding Lokal 50X50/m2 Ikad


Bahan
Keramik 50X50 Ikad m2 1.1000 135,000.00 148,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 170,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 218,123.00

F1079 Pas.Keramik Dinding Lokal 40X40/m2 Ikad


Bahan
Keramik 40X40 Ikad m2 1.1000 120,000.00 132,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 153,723.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 201,623.00

528975646.xls
Page 222 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1080 Pas.Keramik Dinding Lokal 30X30/m2 Ikad


Bahan
Keramik 30X30 Ikad m2 1.1000 105,000.00 115,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 137,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 185,123.00

F1081 Pas.Keramik Dinding Lokal 20X25/m2 Ikad


Bahan
Keramik 20X25 Ikad m2 1.1000 90,000.00 99,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 120,723.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 168,623.00

F1082 Pas.Keramik Dinding Lokal 20X20/m2 Ikad


Bahan
Keramik 20X20 Ikad m2 1.1000 75,000.00 82,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 104,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 152,123.00

F1083 Pas.Keramik Dinding Lokal 10X20/m2 Ikad


Bahan
Keramik 10X20 Ikad m2 1.1000 60,000.00 66,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 87,723.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00

528975646.xls
Page 223 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 135,623.00

F1084 Pas.Keramik Dinding Lokal 60X60/m2 Roman


Bahan
Keramik 60X60 Roman m2 1.1000 135,000.00 148,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 170,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 218,123.00

F1085 Pas.Keramik Dinding Lokal 50X50/m2 Roman


Bahan
Keramik 50X50 Roman m2 1.1000 120,000.00 132,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 153,723.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 201,623.00

F1086 Pas.Keramik Dinding Lokal 40X40/m2 Roman


Bahan
Keramik 40X40 Roman m2 1.1000 105,000.00 115,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 137,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 185,123.00

F1087 Pas.Keramik Dinding Lokal 30X30/m2 Roman


Bahan
Keramik 30X30 Roman m2 1.1000 90,000.00 99,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 120,723.00

528975646.xls
Page 224 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 168,623.00

F1088 Pas.Keramik Dinding Lokal 20X25/m2 Roman


Bahan
Keramik 20X25 Roman m2 1.1000 75,000.00 82,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 104,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 152,123.00

F1089 Pas.Keramik Dinding Lokal 20X20/m2 Roman


Bahan
Keramik 20X20 Roman m2 1.1000 60,000.00 66,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 87,723.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 135,623.00

F1090 Pas.Keramik Dinding Lokal 10X20/m2 Roman


Bahan
Keramik 10X20 Roman m2 1.1000 45,000.00 49,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 71,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 119,123.00

528975646.xls
Page 225 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1091 Pas.Keramik Dinding Lokal 60X60/m2 Mulia


Bahan
Keramik 60X60 Mulia m2 1.1000 105,000.00 115,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 137,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 185,123.00

F1092 Pas.Keramik Dinding Lokal 50X50/m2 Mulia


Bahan
Keramik 50X50 Mulia m2 1.1000 90,000.00 99,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 120,723.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 161,123.00

F1093 Pas.Keramik Dinding Lokal 40X40/m2 Mulia


Bahan
Keramik 40X40 Mulia m2 1.1000 82,500.00 90,750.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 112,473.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 152,873.00

F1094 Pas.Keramik Dinding Lokal 30X30/m2 Mulia


Bahan
Keramik 20X20 Mulia m2 1.1000 75,000.00 82,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 104,223.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00

528975646.xls
Page 226 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 144,623.00

F1095 Pas.Keramik Dinding Lokal 20X25/m2 Mulia


Bahan
Keramik 20X25 Mulia m2 1.1000 67,500.00 74,250.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 95,973.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 136,373.00

F1096 Pas.Keramik Dinding Lokal 20X20/m2 Mulia


Bahan
Keramik 20X20 Mulia m2 1.1000 60,000.00 66,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 91,473.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 131,873.00

F1097 Pas.Keramik Dinding Lokal 10X20/m2 Mulia


Bahan
Keramik 10X20 Mulia m2 1.1000 45,000.00 49,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 74,973.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,900.00
Jumlah.a+b+c 115,373.00

F1098 Pas.Batu Alam Dinding Bronjol Hitam/m2


Bahan
Batu Alam Bronjol Hitam m2 1.1000 150,000.00 165,000.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 190,473.00

528975646.xls
Page 227 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 1.0000 3,000.00 3,000.00
Jumlah.c 4,400.00
Jumlah.a+b+c 239,873.00

F1099 Pas.Batu Alam Dinding Hitam/m2


Bahan
Batu Alam Hitam m2 1.1000 165,000.00 181,500.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 206,973.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 1.0000 3,000.00 3,000.00
Jumlah.c 4,400.00
Jumlah.a+b+c 256,373.00

F1100 Pas.Batu Alam Dinding Paras Kuning/m2


Bahan
Batu Alam Bronjol m2 1.1000 187,500.00 206,250.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 231,723.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 1.0000 3,000.00 3,000.00
Jumlah.c 4,400.00
Jumlah.a+b+c 281,123.00

F1101 Pas.Batu Bintang Putih/m2


Bahan
Batu Alam Paras m2 1.1000 202,500.00 222,750.00
Spesi 1:4 m3 0.0220 646,500.00 14,223.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 248,223.00
Upah Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Batu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 45,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 1.0000 3,000.00 3,000.00
Jumlah.c 4,400.00
Jumlah.a+b+c 297,623.00

528975646.xls
Page 228 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1102 Profilan Plesteran 5x5/m'


Bahan
Spesi 1:3 m3 0.0025 646,500.00 1,616.25
Semen Pengaci sak 0.0060 52,500.00 315.00
Jumlah.a 1,931.25
Upah Pasang
Kenek ht 0.4000 90,000.00 36,000.00
Tk.Batu Halus ht 0.2000 90,000.00 18,000.00
Kep.Tukang ht 0.0400 108,000.00 4,320.00
Mandor ht 0.0133 126,000.00 1,680.00
Jumlah.b 60,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Jumlah.c 1,400.00
Jumlah.a+b+c 63,331.25

F1103 Profilan Plesteran 5x7,5/m'


Bahan
Spesi 1:3 m3 0.0038 646,500.00 2,456.70
Semen Pengaci sak 0.0060 52,500.00 315.00
Jumlah.a 2,771.70
Upah Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Batu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.0600 108,000.00 6,480.00
Mandor ht 0.0200 126,000.00 2,520.00
Jumlah.b 90,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Jumlah.c 1,400.00
Jumlah.a+b+c 94,171.70

F1104 Profilan Plesteran 7,5x7,5/m'


Bahan
Spesi 1:3 m3 0.0056 646,500.00 3,620.40
Semen Pengaci sak 0.0090 52,500.00 472.50
Jumlah.a 4,092.90
Upah Pasang
Kenek ht 0.9000 90,000.00 81,000.00
Tk.Batu Halus ht 0.4500 90,000.00 40,500.00
Kep.Tukang ht 0.0900 108,000.00 9,720.00
Mandor ht 0.0300 126,000.00 3,780.00
Jumlah.b 135,000.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Jumlah.c 1,400.00
Jumlah.a+b+c 140,492.90

F1105 Profilan Plesteran 7,5x10/m'


Bahan
Spesi 1:3 m3 0.0075 646,500.00 4,848.75
Semen Pengaci sak 0.0090 52,500.00 472.50
Jumlah.a 5,321.25
Upah Pasang
Kenek ht 1.1700 90,000.00 105,300.00
Tk.Batu Halus ht 0.5850 90,000.00 52,650.00
Kep.Tukang ht 0.1170 108,000.00 12,636.00
Mandor ht 0.0390 126,000.00 4,914.00
Jumlah.b 175,500.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Jumlah.c 1,400.00
Jumlah.a+b+c 182,221.25

528975646.xls
Page 229 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

F1106 Profilan Plesteran 10x10/m'


Bahan
Spesi 1:3 m3 0.0100 646,500.00 6,465.00
Semen Pengaci sak 0.0120 52,500.00 630.00
Jumlah.a 7,095.00
Upah Pasang
Kenek ht 1.4630 90,000.00 131,670.00
Tk.Batu Halus ht 0.7315 90,000.00 65,835.00
Kep.Tukang ht 0.1463 108,000.00 15,800.40
Mandor ht 0.0488 126,000.00 6,144.60
Jumlah.b 219,450.00
Alat Bantu
Ember bh 0.0400 10,000.00 400.00
Pacul bh 0.0200 50,000.00 1,000.00
Jumlah.c 1,400.00
Jumlah.a+b+c 227,945.00

F1107 Beton Meja Lebar 60cm Tebal 5cm Besi dia 1020+dia 820/m'
Beton 1Pc:2Psr:3Spl m3 0.0035 926,925.00 3,244.24
Bekisting Praktis m2 0.8000 56,537.70 45,230.16
Pembesian Polos dia 10mm kg 2.7148 13,546.25 36,775.36
Pembesian Polos dia 8mm kg 2.6070 13,546.25 35,315.07
Tambahan Upah Tk.Batu+Kenek ht 0.2000 198,000.00 39,600.00
Jumlah 160,164.83

F1108 Beton Meja Lebar 60cm Tebal 7cm Besi dia 1015+dia 820/m'
Beton 1Pc:2Psr:3Spl m3 0.0500 926,925.00 46,346.25
Bekisting Praktis m2 0.8000 56,537.70 45,230.16
Pembesian Polos dia 10mm kg 5.4296 13,546.25 73,550.72
Pembesian Polos dia 8mm kg 2.6070 13,546.25 35,315.07
Tambahan Upah Tk.Batu+Kenek ht 0.3000 198,000.00 59,400.00
Jumlah 259,842.20

F1109 Beton Meja Lebar 60cm Tebal 10cm Besi dia 1010+dia 820/m'
Beton 1Pc:2Psr:3Spl m3 0.0715 926,925.00 66,275.14
Bekisting Praktis m2 0.8000 56,537.70 45,230.16
Pembesian Polos dia 10mm kg 7.4657 13,546.25 101,132.24
Pembesian Polos dia 8mm kg 2.6070 13,546.25 35,315.07
Tambahan Upah Tk.Batu+Kenek ht 0.4000 198,000.00 79,200.00
Jumlah 327,152.61

528975646.xls
Page 230 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.PLAFOND

Lantai1

G1001 Rangka Plafond Kaso 5X7/m2


(Bawah Kap/Kudakuda)
Bahan
Kaso Rangka m3 0.0168 1,500,000.00 25,200.00
Kaso Penggantung m3 0.0084 1,500,000.00 12,600.00
Reng Klos 2/3 m3 0.0010 5,250,000.00 5,250.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 10cm kg 0.0270 11,250.00 303.75
Paku 7cm kg 0.1600 12,750.00 2,040.00
Paku 5cm kg 0.0810 12,750.00 1,032.75
Jumlah.a 46,614.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Jumlah.a+b 69,114.00

G1002 Rangka Plafond Kaso 4X6/m2


(Bawah Kap/Kudakuda)
Bahan
Kaso Rangka m3 0.0150 1,500,000.00 22,500.00
Kaso Penggantung m3 0.0090 1,500,000.00 13,500.00
Reng Klos 2/3 m3 0.0010 5,250,000.00 5,250.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 10cm kg 0.0210 11,250.00 236.25
Paku 7cm kg 0.1600 12,750.00 2,040.00
Paku 5cm kg 0.0410 12,750.00 522.75
Jumlah.a 44,236.50
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Jumlah.a+b 62,986.50

G1003 Rangka Plafond Kaso 5X7/m2


(Bawah Dak Beton)
Bahan
Kaso Rangka m3 0.0168 1,500,000.00 25,200.00
Kawat Penggantung m' 1.0000 5,250.00 5,250.00
Reng Klos 2/3 m3 0.0010 5,250,000.00 5,250.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 10cm kg 0.0270 11,250.00 303.75
Paku 7cm kg 0.1600 12,750.00 2,040.00
Paku 5cm kg 0.0810 12,750.00 1,032.75
Jumlah.a 39,264.00

528975646.xls
Page 231 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Jumlah.a+b 61,764.00

G1004 Rangka Plafond Kaso 4X6/m2


(Bawah Dak Beton)
Bahan
Kaso Rangka m3 0.0150 1,500,000.00 22,500.00
Kawat Penggantung m' 1.0000 5,250.00 5,250.00
Reng Klos 2/3 m3 0.0010 5,250,000.00 5,250.00
Benang Rami glg 0.0500 3,750.00 187.50
Paku 10cm kg 0.0210 11,250.00 236.25
Paku 7cm kg 0.1600 12,750.00 2,040.00
Paku 5cm kg 0.0410 12,750.00 522.75
Jumlah.a 35,986.50
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Jumlah.a+b 54,736.50

G1005 Rangka Plafond Besi Hollow/m2


(Bawah Kap/Kudakuda)
Bahan
Rangka Tengah Hollow 4x4cm P.6,00m btg 0.3666 112,500.00 41,242.50
Rangka Tengah Hollow 2x4cm P.4,00m btg 0.3666 52,500.00 19,246.50
Rangka Tengah Hollow 2x4cm P.4,00m btg 0.2222 52,500.00 11,665.50
Baut Sekrup dia. 3mm2,50cm bh 5.8666 525.00 3,079.97
Benang Rami glg 0.0500 3,750.00 187.50
Jumlah a 75,421.97

Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk Kayu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 529.20
Jumlah b 18,754.20
Jumlah a+b 94,176.17

G1006 Rangka Plafond Besi Hollow/m2


(Bawah Dak/Plat Lantai)
Bahan
Rangka Tengah Hollow 4x4cm P.6,00m btg 0.3666 112,500.00 41,242.50
Rangka Tengah Hollow 2x4cm P.4,00m btg 0.3666 52,500.00 19,246.50
Besi Penggantung dia. 6mm12,00m kg 0.2222 8,250.00 1,833.15
Baut Sekrup dia. 3mm2,50cm bh 5.8666 525.00 3,079.97
Benang Rami glg 0.0500 3,750.00 187.50
Jumlah a 65,589.62

Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk Kayu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 529.20
Jumlah b 18,754.20
Jumlah a+b 84,343.82

G1007 Plafond Asbes Plat 4mm/m2


Bahan
Asbes Plat 4mm m2 1.1000 11,250.00 12,375.00
Paku Asbes kg 0.0530 15,000.00 795.00
Jumlah.a 13,170.00

528975646.xls
Page 232 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.0600 90,000.00 5,400.00
Tk.Kayu Halus ht 0.0600 90,000.00 5,400.00
Kep.Tukang ht 0.0120 108,000.00 1,296.00
Mandor ht 0.0040 126,000.00 504.00
Jumlah.b 12,600.00
Jumlah.a+b 25,770.00

G1008 Plafond Asbes Plat 6mm/m2


Bahan
Asbes Plat 6mm lbr 0.3819 18,750.00 7,160.63
Paku Triplex kg 0.0530 15,000.00 795.00
Jumlah.a 7,955.63
Upah
Kenek ht 0.0660 90,000.00 5,940.00
Tk.Kayu Halus ht 0.0660 90,000.00 5,940.00
Kep.Tukang ht 0.0132 108,000.00 1,425.60
Mandor ht 0.0044 126,000.00 554.40
Jumlah.b 13,860.00
Jumlah.a+b 21,815.63

G1009 Plafond Triplex 4mm/m2


Bahan
Triplex 4mm lbr 0.3819 60,000.00 22,914.00
Paku Triplex kg 0.0530 15,000.00 795.00
Jumlah.a 23,709.00
Upah
Kenek ht 0.0500 90,000.00 4,500.00
Tk.Kayu Halus ht 0.0500 90,000.00 4,500.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 10,500.00
Jumlah.a+b 34,209.00

G1010 Plafond Triplex 6mm/m2


Bahan
Triplex 6mm lbr 0.3819 90,000.00 34,371.00
Paku Triplex kg 0.0530 15,000.00 795.00
Jumlah.a 35,166.00
Upah
Kenek ht 0.0625 90,000.00 5,625.00
Tk.Kayu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 13,125.00
Jumlah.a+b 48,291.00

G1011 Plafond Triplex 9mm/m2


Bahan
Triplex 9mm lbr 0.3819 135,000.00 51,556.50
Paku Triplex kg 0.0530 15,000.00 795.00
Jumlah.a 52,351.50
Upah
Kenek ht 0.0625 90,000.00 5,625.00
Tk.Kayu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 13,125.00
Jumlah.a+b 65,476.50

G1012 Plafond Gypsum 9mm/m2


Bahan
Gypsum 9mm lbr 0.3819 60,000.00 22,914.00
Paku Gypsum kg 0.0500 15,000.00 750.00
Jumlah.a 23,664.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 44,664.00

528975646.xls
Page 233 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

G1013 Plafond Gypsum 12mm/m2


Bahan
Gypsum 12mm lbr 0.3819 75,000.00 28,642.50
Paku Gypsum kg 0.0500 15,000.00 750.00
Jumlah.a 29,392.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 50,392.50

G1014 Plafond Lambrisering Jati/m2


Bahan
Lambrisering Jati m2 1.0500 300,000.00 315,000.00
Paku kg 0.0500 15,000.00 750.00
Jumlah.a 315,750.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 336,750.00

G1015 Plafond Lambrisering Bangkirai/m2


Bahan
Lambrisering Bangkirai m2 1.0500 262,500.00 275,625.00
Paku kg 0.0500 15,000.00 750.00
Jumlah.a 276,375.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 297,375.00

G1016 Plafond Lambrisering Kmper Samarinda/m2


Bahan
Lambrisering Kamper Samarinda m2 1.0500 225,000.00 236,250.00
Paku kg 0.0500 15,000.00 750.00
Jumlah.a 237,000.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 258,000.00

G1017 Plafond Lambrisering Kamper Medan/m2


Bahan
Lambrisering Kamper Medan m2 1.0500 187,500.00 196,875.00
Paku kg 0.0500 15,000.00 750.00
Jumlah.a 197,625.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 218,625.00

G1018 Plafond Lambrisering Meranti/m2


Bahan
Lambrisering Meranti m2 1.0500 150,000.00 157,500.00
Paku kg 0.0500 15,000.00 750.00
Jumlah.a 158,250.00

528975646.xls
Page 234 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 179,250.00

G1019 List Sudut Profil Kayu 3x3/m'


Bahan
List Profil 3x3cm btg 0.2750 30,000.00 8,250.00
Paku 5cm kg 0.0330 12,750.00 420.75
Jumlah.a 8,670.75
Upah
Kenek ht 0.0750 90,000.00 6,750.00
Tk.Kayu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 15,750.00
Jumlah.a+b 24,420.75

G1020 List Sudut Profil Kayu 3x5/m'


Bahan
List Profil 3x5cm btg 0.2750 37,500.00 10,312.50
Paku 5cm kg 0.0330 12,750.00 420.75
Jumlah.a 10,733.25
Upah
Kenek ht 0.0750 90,000.00 6,750.00
Tk.Kayu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 15,750.00
Jumlah.a+b 26,483.25

G1021 List Sudut Profil Kayu 5x5/m'


Bahan
List Profil 5x5cm btg 0.2500 45,000.00 11,250.00
Paku 7cm kg 0.0550 12,750.00 701.25
Jumlah.a 11,951.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 32,951.25

G1022 List Sudut Profil Kayu 5x7,5/m'


Bahan
List Profil 5x7,5cm btg 0.2500 60,000.00 15,000.00
Paku 7cm kg 0.0550 12,750.00 701.25
Jumlah.a 15,701.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 36,701.25

G1023 List Sudut Profil Kayu 7,5x7,5/m'


Bahan
List Profil btg 0.2500 67,500.00 16,875.00
Paku 7cm kg 0.0750 12,750.00 956.25
Jumlah.a 17,831.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 38,831.25

528975646.xls
Page 235 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

G1024 List Sudut Profil Kayu 7,5x10/m'


Bahan
List Profil btg 0.2500 75,000.00 18,750.00
Paku 7cm kg 0.0750 12,750.00 956.25
Jumlah.a 19,706.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 40,706.25

G1025 List Sudut Profil Kayu 10x10/m'


Bahan
List Profil btg 0.2500 82,500.00 20,625.00
Paku 7cm kg 0.0750 12,750.00 956.25
Jumlah.a 21,581.25
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 42,581.25

G1026 List Sudut Profil Gypsum 3x3/m'


Bahan
List Profil Gypsum 5x5cm btg 0.5500 37,500.00 20,625.00
Paku 7cm kg 0.0500 12,750.00 637.50
Jumlah.a 21,262.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 42,262.50

G1027 List Sudut Profil Gypsum 3x5/m'


Bahan
List Profil Gypsum 5x7,5cm btg 0.5500 45,000.00 24,750.00
Paku 7cm kg 0.0500 12,750.00 637.50
Jumlah.a 25,387.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 46,387.50

G1028 List Sudut Profil Gypsum 5x5/m'


Bahan
List Profil Gypsum 5x5cm btg 0.5500 52,500.00 28,875.00
Paku 7cm kg 0.0500 12,750.00 637.50
Jumlah.a 29,512.50
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 50,512.50

G1029 List Sudut Profil Gypsum 5x7,5/m'


Bahan
List Profil Gypsum 5x7,5cm btg 0.5500 60,000.00 33,000.00
Paku 7cm kg 0.0500 12,750.00 637.50
Jumlah.a 33,637.50

528975646.xls
Page 236 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Kayu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 21,000.00
Jumlah.a+b 54,637.50

G1030 List Sudut Profil Gypsum 7,5x7,5/m'


Bahan
List Profil Gypsum 7,5x7,5cm btg 0.5500 67,500.00 37,125.00
Paku 5cm kg 0.0750 12,750.00 956.25
Jumlah.a 38,081.25
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Kayu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 26,250.00
Jumlah.a+b 64,331.25

G1031 List Sudut Profil Gypsum 7,5x10/m'


Bahan
List Profil Gypsum 7,5x10cm btg 0.5500 75,000.00 41,250.00
Paku 7cm kg 0.1000 12,750.00 1,275.00
Jumlah.a 42,525.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 31,500.00
Jumlah.a+b 74,025.00

G1032 List Sudut Profil Gypsum 10x10/m'


Bahan
List Profil Gypsum 10x10cm btg 0.5500 82,500.00 45,375.00
Paku 7cm kg 0.1000 12,750.00 1,275.00
Jumlah.a 46,650.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 31,500.00
Jumlah.a+b 78,150.00

G1033 List Sudut Profil Gypsum 10x15/m'


Bahan
List Profil Gypsum 10x15cm btg 0.5500 90,000.00 49,500.00
Paku 7cm kg 0.1000 12,750.00 1,275.00
Jumlah.a 50,775.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 31,500.00
Jumlah.a+b 82,275.00

G1034 List Sudut Profil Gypsum 15x15/m'


Bahan
List Profil Gypsum 15x15cm btg 0.5500 97,500.00 53,625.00
Paku 7cm kg 0.1000 12,750.00 1,275.00
Jumlah.a 54,900.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Kayu Halus ht 0.1500 90,000.00 13,500.00
Kep.Tukang ht 0.0300 108,000.00 3,240.00
Mandor ht 0.0100 126,000.00 1,260.00
Jumlah.b 31,500.00
Jumlah.a+b 86,400.00

528975646.xls
Page 237 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.LANTAI

Lantai1
H1001 Pas.Rollag Bataco Semen Pondasi Tepi Teras 1Pc:4Psr 20x20cm/m'
Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Bataco Semen 1:4 m3 0.0400 590,891.35 23,635.65
Jumlah.b 23,635.65
Jumlah.a+b 32,772.18

H1002 Pas.Rollag Bataco Semen Pondasi Tepi Teras 1Pc:4Psr 20x30cm/m'


Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Bataco Semen 1:4 m3 0.0600 590,891.35 35,453.48
Jumlah.b 35,453.48
Jumlah.a+b 47,037.02

H1003 Pas.Rollag Bataco Semen Pondasi Tepi Teras 1Pc:4Psr 20x40cm/m'


Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Bataco Semen 1:4 m3 0.0800 590,891.35 47,271.31

528975646.xls
Page 238 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Jumlah.b 47,271.31
Jumlah.a+b 61,301.86

H1004 Pas.Rollag Bataco Semen Pondasi Tepi Teras 1Pc:5Psr 20x20cm/m'


Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Bataco Semen 1:4 m3 0.0400 586,699.83 23,467.99
Jumlah.b 23,467.99
Jumlah.a+b 32,604.52

H1005 Pas.Rollag Bataco Semen Pondasi Tepi Teras 1Pc:5Psr 20x30cm/m'


Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Bataco Semen 1:4 m3 0.0600 586,699.83 35,201.99
Jumlah.b 35,201.99
Jumlah.a+b 46,785.53

H1006 Pas.Rollag Bataco Semen Pondasi Tepi Teras 1Pc:5Psr 20x40cm/m'


Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Bataco Semen 1:4 m3 0.0800 586,699.83 46,935.99
Jumlah.b 46,935.99
Jumlah.a+b 60,966.54

528975646.xls
Page 239 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1007 Pas.Rollag Bata Kampung Pondasi Tepi Teras 1Pc:4Psr 20x20cm/m'


Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Bata Kampung 1:4 m3 0.0400 655,789.57 26,231.58
Jumlah.b 26,231.58
Jumlah.a+b 35,368.11

H1008 Pas.Rollag Bata Kampung Pondasi Tepi Teras 1Pc:4Psr 20x30cm/m'


Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Bata Kampung 1:4 m3 0.0600 655,789.57 39,347.37
Jumlah.b 39,347.37
Jumlah.a+b 50,930.91

H1009 Pas.Rollag Bata Kampung Pondasi Tepi Teras 1Pc:4Psr 20x40cm/m'


Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Bata Kampung 1:4 m3 0.0800 655,789.57 52,463.17
Jumlah.b 52,463.17
Jumlah.a+b 66,493.72

H1010 Pas.Rollag Bata Kampung Pondasi Tepi Teras 1Pc:5Psr 20x20cm/m'


Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Bata Kampung 1:5 m3 0.0400 645,584.24 25,823.37
Jumlah.b 25,823.37
Jumlah.a+b 34,959.90

H1011 Pas.Rollag Bata Kampung Pondasi Tepi Teras 1Pc:5Psr 20x30cm/m'


Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Bata Kampung 1:5 m3 0.0600 645,584.24 38,735.05
Jumlah.b 38,735.05
Jumlah.a+b 50,318.59

H1012 Pas.Rollag Bata Kampung Pondasi Tepi Teras 1Pc:5Psr 20x40cm/m'


Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Bata Kampung 1:5 m3 0.0800 645,584.24 51,646.74
Jumlah.b 51,646.74
Jumlah.a+b 65,677.29

528975646.xls
Page 240 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1013 Pas.Rollag Bata Kuo Shin Pondasi Tepi Teras 1Pc:4Psr 20x20cm/m'
Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Bata Kuo Shin 1:4 m3 0.0400 756,269.77 30,250.79
Jumlah.b 30,250.79
Jumlah.a+b 39,387.32

H1014 Pas.Rollag Bata Kuo Shin Pondasi Tepi Teras 1Pc:4Psr 20x30cm/m'
Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Bata Kuo Shin 1:4 m3 0.0600 756,269.77 45,376.19
Jumlah.b 45,376.19
Jumlah.a+b 56,959.73

H1015 Pas.Rollag Bata Kuo Shin Pondasi Tepi Teras 1Pc:4Psr 20x40cm/m'
Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Bata Kuo Shin 1:4 m3 0.0800 756,269.77 60,501.58
Jumlah.b 60,501.58
Jumlah.a+b 74,532.13

H1016 Pas.Rollag Bata Kuo Shin Pondasi Tepi Teras 1Pc:5Psr 20x20cm/m'
Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Bata Kuo Shin 1:5 m3 0.0400 748,129.49 29,925.18
Jumlah.b 29,925.18
Jumlah.a+b 39,061.71

H1017 Pas.Rollag Bata Kuo Shin Pondasi Tepi Teras 1Pc:5Psr 20x30cm/m'
Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Bata Kuo Shin 1:5 m3 0.0600 748,129.49 44,887.77
Jumlah.b 44,887.77
Jumlah.a+b 56,471.31

H1018 Pas.Rollag Bata Kuo Shin Pondasi Tepi Teras 1Pc:5Psr 20x40cm/m'
Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Bata Kuo Shin 1:5 m3 0.0800 748,129.49 59,850.36
Jumlah.b 59,850.36
Jumlah.a+b 73,880.91

H1019 Pas.Rollag Bata Press Pondasi Tepi Teras 1Pc:4Psr 20x20cm/m'


Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53

528975646.xls
Page 241 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Bahan+Upah
Rollag Bata Press 1:4 m3 0.0400 734,183.00 29,367.32
Jumlah.b 29,367.32
Jumlah.a+b 38,503.85

H1020 Pas.Rollag Bata Press Pondasi Tepi Teras 1Pc:4Psr 20x30cm/m'


Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Bata Press 1:4 m3 0.0600 734,183.00 44,050.98
Jumlah.b 44,050.98
Jumlah.a+b 55,634.52

H1021 Pas.Rollag Bata Press Pondasi Tepi Teras 1Pc:4Psr 20x40cm/m'


Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Bata Press 1:4 m3 0.0800 734,183.00 58,734.64
Jumlah.b 58,734.64
Jumlah.a+b 72,765.19

H1022 Pas.Rollag Bata Press Pondasi Tepi Teras 1Pc:5Psr 20x20cm/m'


Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Bata Press 1:5 m3 0.0400 724,849.33 28,993.97
Jumlah.b 28,993.97
Jumlah.a+b 38,130.50

H1023 Pas.Rollag Bata Press Pondasi Tepi Teras 1Pc:5Psr 20x30cm/m'


Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Bata Press 1:5 m3 0.0600 724,849.33 43,490.96
Jumlah.b 43,490.96
Jumlah.a+b 55,074.50

H1024 Pas.Rollag Bata Press Pondasi Tepi Teras 1Pc:5Psr 20x40cm/m'


Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Bata Press 1:5 m3 0.0800 724,849.33 57,987.95
Jumlah.b 57,987.95
Jumlah.a+b 72,018.50

H1025 Pas.Rollag Celcon Bloc T.10cm Pondasi Tepi Teras 1Pc:4Psr 20x20cm/m'
Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Celcon Bloc T.10cm 1:4 m3 0.0400 1,133,337.55 45,333.50
Jumlah.b 45,333.50
Jumlah.a+b 54,470.03

528975646.xls
Page 242 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1026 Pas.Rollag Celcon Bloc T.10cm Pondasi Tepi Teras 1Pc:4Psr 20x30cm/m'
Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Celcon Bloc T.10cm 1:4 m3 0.0600 1,133,337.55 68,000.25
Jumlah.b 68,000.25
Jumlah.a+b 79,583.79

H1027 Pas.Rollag Celcon Bloc T.10cm Pondasi Tepi Teras 1Pc:4Psr 20x40cm/m'
Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Celcon Bloc T.10cm 1:4 m3 0.0800 1,133,337.55 90,667.00
Jumlah.b 90,667.00
Jumlah.a+b 104,697.55

H1028 Pas.Rollag Celcon Bloc T.10cm Pondasi Tepi Teras 1Pc:5Psr 20x20cm/m'
Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Celcon Bloc T.10cm 1:5 m3 0.0400 1,129,146.03 45,165.84
Jumlah.b 45,165.84
Jumlah.a+b 54,302.37

H1029 Pas.Rollag Celcon Bloc T.10cm Pondasi Tepi Teras 1Pc:5Psr 20x30cm/m'
Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Celcon Bloc T.10cm 1:5 m3 0.0600 1,129,146.03 67,748.76
Jumlah.b 67,748.76
Jumlah.a+b 79,332.30

H1030 Pas.Rollag Celcon Bloc T.10cm Pondasi Tepi Teras 1Pc:5Psr 20x40cm/m'
Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Celcon Bloc T.10cm 1:5 m3 0.0800 1,129,146.03 90,331.68
Jumlah.b 90,331.68
Jumlah.a+b 104,362.23

H1031 Pas.Rollag Celcon Bloc T.7,5cm Pondasi Tepi Teras 1Pc:4Psr 20x20cm/m'
Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Celcon Bloc T.10cm 1:4 m3 0.0400 1,167,131.36 46,685.25
Jumlah.b 46,685.25
Jumlah.a+b 55,821.78

H1032 Pas.Rollag Celcon Bloc T.7,5cm Pondasi Tepi Teras 1Pc:4Psr 20x30cm/m'
Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54

528975646.xls
Page 243 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Bahan+Upah
Rollag Celcon Bloc T.10cm 1:4 m3 0.0600 1,167,131.36 70,027.88
Jumlah.b 70,027.88
Jumlah.a+b 81,611.42

H1033 Pas.Rollag Celcon Bloc T.7,5cm Pondasi Tepi Teras 1Pc:4Psr 20x40cm/m'
Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Celcon Bloc T.10cm 1:4 m3 0.0800 1,167,131.36 93,370.51
Jumlah.b 93,370.51
Jumlah.a+b 107,401.06

H1034 Pas.Rollag Celcon Bloc T.7,5cm Pondasi Tepi Teras 1Pc:5Psr 20x20cm/m'
Upah
Galian Tanah m3 0.1000 59,683.20 5,968.32
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0050 29,841.60 149.21
Jumlah.a 9,136.53
Bahan+Upah
Rollag Celcon Bloc T.7,5cm 1:5 m3 0.0400 1,163,053.91 46,522.16
Jumlah.b 46,522.16
Jumlah.a+b 55,658.68

H1035 Pas.Rollag Celcon Bloc T.7,5cm Pondasi Tepi Teras 1Pc:5Psr 20x30cm/m'
Upah
Galian Tanah m3 0.1400 59,683.20 8,355.65
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0070 29,841.60 208.89
Jumlah.a 11,583.54
Bahan+Upah
Rollag Celcon Bloc T.7,5cm 1:5 m3 0.0600 1,163,053.91 69,783.23
Jumlah.b 69,783.23
Jumlah.a+b 81,366.77

H1036 Pas.Rollag Celcon Bloc T.7,5cm Pondasi Tepi Teras 1Pc:5Psr 20x40cm/m'
Upah
Galian Tanah m3 0.1800 59,683.20 10,742.98
Pemadatan Tanah m2 0.4000 7,547.50 3,019.00
Urugan Tanah Kembali m3 0.0090 29,841.60 268.57
Jumlah.a 14,030.55
Bahan+Upah
Rollag Celcon Bloc T.7,5cm 1:5 m3 0.0800 1,163,053.91 93,044.31
Jumlah.b 93,044.31
Jumlah.a+b 107,074.86

H1037 Urugan Tanah Lantai/m3


(Tanah Dari Dalam)
Bahan
Tanah Urug m3 0.0000 150,000.00 0.00
Jumlah.a 0.00
Upah
Mengurug Tanah Padat m3 1.2500 47,853.90 59,817.38
Pemadatan Tanah 2X m2 6.0000 4,838.00 29,028.00
Jumlah.b 88,845.38
Alat
Mesin Stamper m3 0.1599 200,000.00 31,980.00
Jumlah.c 31,980.00
Jumlah.a+b+c 120,825.38

H1038 Urugan Tanah Lantai/m3


(Tanah Dari Luar)
Bahan
Tanah Urug m3 1.2500 150,000.00 187,500.00
Jumlah.a 187,500.00
Upah
Mengurug Tanah Padat m3 1.2500 47,853.90 59,817.38
Pemadatan Tanah 2X m2 6.0000 4,838.00 29,028.00
Jumlah.b 88,845.38

528975646.xls
Page 244 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Mesin Stamper m3 0.1599 200,000.00 31,980.00
Jumlah.c 31,980.00
Jumlah.a+b+c 308,325.38

H1039 Pemadatan Tanah Lantai/m2


(Dgn Timbrisan Tangan)
Upah+Alat
Pemadatan Tanah 2X m2 2.0000 4,838.00 9,676.00
Jumlah.a+b+c 9,676.00

H1040 Pemadatan Tanah Lantai/m2


(Dgn Mesin Stamper)
Upah
Pemadatan Tanah 2X m2 2.0000 7,547.50 15,095.00
Jumlah.a+b+c 15,095.00

H1041 Urugan Pasir Lantai/m3 dgn Pasir Urug


Bahan
Pasir Urug Darat m3 1.3000 217,500.00 282,750.00
Jumlah.a 282,750.00
Upah
Tk.Gali Ht 0.2000 99,000.00 19,800.00
Kep.Tukang Ht 0.0400 108,000.00 4,320.00
Mandor Ht 0.0133 126,000.00 1,680.00
Jumlah.b 25,800.00
Pemadatan Manual 2x m2 2.0000 4,838.00 9,676.00
Jumlah.b+c 9,676.00
Jumlah.a+b+c 318,226.00

H1042 Urugan Pasir Lantai/m3 dgn Pasir extra Beton


Bahan
Pasir Extra Beton m3 1.2500 240,000.00 300,000.00
Jumlah.a 300,000.00
Upah
Tk.Gali Ht 0.2000 99,000.00 19,800.00
Kep.Tukang Ht 0.0400 108,000.00 4,320.00
Mandor Ht 0.0133 126,000.00 1,680.00
Jumlah.b 25,800.00
Pemadatan Manual 2x m2 2.0000 4,838.00 9,676.00
Jumlah.c 9,676.00
Jumlah.a+b+c 335,476.00

H1043 Urugan Pasir Lantai/m3 dgn Sirtu


Bahan
Sirtu m3 1.2000 257,250.00 308,700.00
Jumlah.a 308,700.00
Upah
Tk.Gali Ht 0.2500 99,000.00 24,750.00
Kep.Tukang Ht 0.0500 108,000.00 5,400.00
Mandor Ht 0.0167 126,000.00 2,100.00
Jumlah.b 32,250.00
Pemadatan Manual 2x m2 2.0000 4,838.00 9,676.00
Jumlah.c 9,676.00
Jumlah.a+b+c 350,626.00

H1044 Pas.Plastik Alas/m2 Plastik Sheet


Bahan
Plastik Sheet m2 1.0500 1,500.00 1,575.00
Jumlah.a 1,575.00
Upah
Kenek ht 0.0200 90,000.00 1,800.00
Tk.Batu Kasar ht 0.0100 108,000.00 1,080.00
Kep.Tukang ht 0.0020 108,000.00 216.00
Mandor ht 0.0007 126,000.00 84.00
Jumlah.b 3,180.00
Jumlah.a+b 4,755.00

H1045 Rabat Beton T.2,5cm/m2 Tanpa Tulang dgn Koral


Bahan
Beton 1Pc:3Psr:5Krl m3 0.0275 874,050.00 24,036.38
Jumlah.a 24,036.38
Upah
Kenek ht 0.0500 90,000.00 4,500.00
Tk.Batu Kasar ht 0.0250 108,000.00 2,700.00
Kep.Tukang ht 0.0050 108,000.00 540.00

528975646.xls
Page 245 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Mandor ht 0.0017 126,000.00 210.00
Jumlah.b 7,950.00
Jumlah.a+b 31,986.38

H1046 Rabat Beton T.5cm/m2 Tanpa Tulang dgn Koral


Bahan
Beton 1Pc:3Psr:5Krl m3 0.0550 874,050.00 48,072.75
Jumlah.a 48,072.75

528975646.xls
Page 246 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 63,972.75

H1047 Rabat Beton T.7,5cm/m2 Tanpa Tulang dgn Koral


Bahan
Beton 1Pc:3Psr:5Krl m3 0.0825 874,050.00 72,109.13
Jumlah.a 72,109.13
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 95,959.13

H1048 Rabat Beton T.10cm/m2 Tanpa Tulang dgn Koral


Bahan
Beton 1Pc:3Psr:5Krl m3 0.1100 874,050.00 96,145.50
Jumlah.a 96,145.50
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 127,945.50

H1049 Rabat Beton T.5cm/m2 dgn Tulang dia 620 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0550 874,050.00 48,072.75
Pembesian dia 6 20 1 lapis kg 1.9536 13,546.25 26,463.95
Jumlah.a 74,536.70
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 90,436.70

H1050 Rabat Beton T.7,5cm/m2 dgn Tulang dia 620 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0825 874,050.00 72,109.13
Pembesian dia 6 20 1 lapis kg 1.9536 13,546.25 26,463.95
Jumlah.a 98,573.08
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 122,423.08

H1051 Rabat Beton T.10cm/m2 dgn Tulang dia 620 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.1100 874,050.00 96,145.50
Pembesian dia 6 20 1 lapis kg 1.9536 13,546.25 26,463.95
Jumlah.a 122,609.45
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 154,409.45

528975646.xls
Page 247 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1052 Rabat Beton T.5cm/m2 dgn Tulang dia 630 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0550 874,050.00 48,072.75
Pembesian dia 6 30 1 lapis kg 1.7094 13,546.25 23,155.96
Jumlah.a 71,228.71
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 87,128.71

H1053 Rabat Beton T.7,5cm/m2 dgn Tulang dia 630 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0825 874,050.00 72,109.13
Pembesian dia 6 30 1 lapis kg 1.7094 13,546.25 23,155.96
Jumlah.a 95,265.08
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 119,115.08

H1054 Rabat Beton T.10cm/m2 dgn Tulang dia 630 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.1100 874,050.00 96,145.50
Pembesian dia 6 30 1 lapis kg 1.7094 13,546.25 23,155.96
Jumlah.a 119,301.46
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 151,101.46

H1055 Rabat Beton T.5cm/m2 dgn Tulang dia 820 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0550 874,050.00 48,072.75
Pembesian dia 8 20 1 lapis kg 3.4760 13,546.25 47,086.77
Jumlah.a 95,159.52
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 111,059.52

H1056 Rabat Beton T.7,5cm/m2 dgn Tulang dia 820 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0700 874,050.00 61,183.50
Pembesian dia 8 20 1 lapis kg 3.4760 13,546.25 47,086.77
Jumlah.a 108,270.27
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 132,120.27

H1057 Rabat Beton T.10cm/m2 dgn Tulang dia 820 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.1100 874,050.00 96,145.50
Pembesian dia 8 20 1 lapis kg 3.4760 13,546.25 47,086.77
Jumlah.a 143,232.27

528975646.xls
Page 248 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 175,032.27

H1058 Rabat Beton T.5cm/m2 dgn Tulang dia 830 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0550 874,050.00 48,072.75
Pembesian dia 8 30 1 lapis kg 3.0415 13,546.25 41,200.92
Jumlah.a 89,273.67
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 105,173.67

H1059 Rabat Beton T.7,5cm/m2 dgn Tulang dia 830 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0825 874,050.00 72,109.13
Pembesian dia 8 30 1 lapis kg 3.0415 13,546.25 41,200.92
Jumlah.a 113,310.04
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 137,160.04

H1060 Rabat Beton T.10cm/m2 dgn Tulang dia 830 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.1100 874,050.00 96,145.50
Pembesian dia 8 30 1 lapis kg 3.0415 13,546.25 41,200.92
Jumlah.a 137,346.42
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 169,146.42

H1061 Rabat Beton T.5cm/m2 dgn Tulang dia 1020 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0550 874,050.00 48,072.75
Pembesian dia 10 20 1 lapis kg 5.4296 13,546.25 73,550.72
Jumlah.a 121,623.47
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 137,523.47

H1062 Rabat Beton T.7,5cm/m2 dgn Tulang dia 1020 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0825 874,050.00 72,109.13
Pembesian dia 10 20 1 lapis kg 5.4296 13,546.25 73,550.72
Jumlah.a 145,659.84
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 169,509.84

528975646.xls
Page 249 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1063 Rabat Beton T.10cm/m2 dgn Tulang dia 1020 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.1100 874,050.00 96,145.50
Pembesian dia 10 20 1 lapis kg 5.4296 13,546.25 73,550.72
Jumlah.a 169,696.22
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 201,496.22

H1064 Rabat Beton T.5cm/m2 dgn Tulang dia 1030 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0550 874,050.00 48,072.75
Pembesian dia 10 30 1 lapis kg 4.7509 13,546.25 64,356.88
Jumlah.a 112,429.63
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 128,329.63

H1065 Rabat Beton T.7,5cm/m2 dgn Tulang dia 1030 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.0825 874,050.00 72,109.13
Pembesian dia 10 30 1 lapis kg 4.7509 13,546.25 64,356.88
Jumlah.a 136,466.00
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 160,316.00

H1066 Rabat Beton T.10cm/m2 dgn Tulang dia 1030 dgn Koral
Bahan+Upah
Beton 1Pc:3Psr:5Krl m3 0.1100 874,050.00 96,145.50
Pembesian dia 10 30 1 lapis kg 4.7509 13,546.25 64,356.88
Jumlah.a 160,502.38
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 192,302.38

H1067 Rabat Beton T.2,5cm/m2 Tanpa Tulang dgn Seplit


Bahan
Beton 1Pc:3Psr:5 Spl m3 0.0275 907,800.00 24,964.50
Jumlah.a 24,964.50
Upah
Kenek ht 0.0500 90,000.00 4,500.00
Tk.Batu Kasar ht 0.0250 108,000.00 2,700.00
Kep.Tukang ht 0.0050 108,000.00 540.00
Mandor ht 0.0017 126,000.00 210.00
Jumlah.b 7,950.00
Jumlah.a+b 32,914.50

H1068 Rabat Beton T.5cm/m2 Tanpa Tulang


Bahan
Beton 1Pc:3Psr:5 Spl m3 0.0550 907,800.00 49,929.00
Jumlah.a 49,929.00

528975646.xls
Page 250 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 65,829.00

H1069 Rabat Beton T.7,5cm/m2 Tanpa Tulang


Bahan
Beton 1Pc:3Psr:5 Spl m3 0.0825 907,800.00 74,893.50
Jumlah.a 74,893.50
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 98,743.50

H1070 Rabat Beton T.10cm/m2 Tanpa Tulang


Bahan
Beton 1Pc:3Psr:5 Spl m3 0.1100 907,800.00 99,858.00
Jumlah.a 99,858.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 131,658.00

H1071 Rabat Beton T.5cm/m2 dgn Tulang dia 620


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0550 907,800.00 49,929.00
Pembesian dia 6 20 1 lapis kg 1.9536 13,546.25 26,463.95
Jumlah.a 76,392.95
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 92,292.95

H1072 Rabat Beton T.7,5cm/m2 dgn Tulang dia 620


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0825 907,800.00 74,893.50
Pembesian dia 6 20 1 lapis kg 1.9536 13,546.25 26,463.95
Jumlah.a 101,357.45
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 125,207.45

H1073 Rabat Beton T.10cm/m2 dgn Tulang dia 620


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.1100 907,800.00 99,858.00
Pembesian dia 6 20 1 lapis kg 1.9536 13,546.25 26,463.95
Jumlah.a 126,321.95
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 158,121.95

528975646.xls
Page 251 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1074 Rabat Beton T.5cm/m2 dgn Tulang dia 630


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0550 907,800.00 49,929.00
Pembesian dia 6 30 1 lapis kg 1.7094 13,546.25 23,155.96
Jumlah.a 73,084.96
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 88,984.96

H1075 Rabat Beton T.7,5cm/m2 dgn Tulang dia 630


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0825 907,800.00 74,893.50
Pembesian dia 6 30 1 lapis kg 1.7094 13,546.25 23,155.96
Jumlah.a 98,049.46
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 121,899.46

H1076 Rabat Beton T.10cm/m2 dgn Tulang dia 630


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.1100 907,800.00 99,858.00
Pembesian dia 6 30 1 lapis kg 1.7094 13,546.25 23,155.96
Jumlah.a 123,013.96
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 154,813.96

H1077 Rabat Beton T.5cm/m2 dgn Tulang dia 820


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0550 907,800.00 49,929.00
Pembesian dia 8 20 1 lapis kg 3.4760 13,546.25 47,086.77
Jumlah.a 97,015.77
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 112,915.77

H1078 Rabat Beton T.7,5cm/m2 dgn Tulang dia 820


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0700 907,800.00 63,546.00
Pembesian dia 8 20 1 lapis kg 3.4760 13,546.25 47,086.77
Jumlah.a 110,632.77
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 134,482.77

H1079 Rabat Beton T.10cm/m2 dgn Tulang dia 820


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.1100 907,800.00 99,858.00
Pembesian dia 8 20 1 lapis kg 3.4760 13,546.25 47,086.77
Jumlah.a 146,944.77

528975646.xls
Page 252 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 178,744.77

H1080 Rabat Beton T.5cm/m2 dgn Tulang dia 830


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0550 907,800.00 49,929.00
Pembesian dia 8 30 1 lapis kg 3.0415 13,546.25 41,200.92
Jumlah.a 91,129.92
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 107,029.92

H1081 Rabat Beton T.7,5cm/m2 dgn Tulang dia 830


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0825 907,800.00 74,893.50
Pembesian dia 8 30 1 lapis kg 3.0415 13,546.25 41,200.92
Jumlah.a 116,094.42
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 139,944.42

H1082 Rabat Beton T.10cm/m2 dgn Tulang dia 830


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.1100 907,800.00 99,858.00
Pembesian dia 8 30 1 lapis kg 3.0415 13,546.25 41,200.92
Jumlah.a 141,058.92
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 172,858.92

H1083 Rabat Beton T.5cm/m2 dgn Tulang dia 1020


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0550 907,800.00 49,929.00
Pembesian dia 10 20 1 lapis kg 5.4296 13,546.25 73,550.72
Jumlah.a 123,479.72
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 139,379.72

H1084 Rabat Beton T.7,5cm/m2 dgn Tulang dia 1020


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0825 907,800.00 74,893.50
Pembesian dia 10 20 1 lapis kg 5.4296 13,546.25 73,550.72
Jumlah.a 148,444.22
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 172,294.22

528975646.xls
Page 253 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1085 Rabat Beton T.10cm/m2 dgn Tulang dia 1020


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.1100 907,800.00 99,858.00
Pembesian dia 10 20 1 lapis kg 5.4296 13,546.25 73,550.72
Jumlah.a 173,408.72
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 205,208.72

H1086 Rabat Beton T.5cm/m2 dgn Tulang dia 1030


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0550 907,800.00 49,929.00
Pembesian dia 10 30 1 lapis kg 4.7509 13,546.25 64,356.88
Jumlah.a 114,285.88
Upah Gelar
Kenek ht 0.1000 90,000.00 9,000.00
Tk.Batu Kasar ht 0.0500 108,000.00 5,400.00
Kep.Tukang ht 0.0100 108,000.00 1,080.00
Mandor ht 0.0033 126,000.00 420.00
Jumlah.b 15,900.00
Jumlah.a+b 130,185.88

H1087 Rabat Beton T.7,5cm/m2 dgn Tulang dia 1030


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.0825 907,800.00 74,893.50
Pembesian dia 10 30 1 lapis kg 4.7509 13,546.25 64,356.88
Jumlah.a 139,250.38
Upah Gelar
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Kasar ht 0.0750 108,000.00 8,100.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 23,850.00
Jumlah.a+b 163,100.38

H1088 Rabat Beton T.10cm/m2 dgn Tulang dia 1030


Bahan+Upah
Beton 1Pc:3Psr:5Spl m3 0.1100 907,800.00 99,858.00
Pembesian dia 10 30 1 lapis kg 4.7509 13,546.25 64,356.88
Jumlah.a 164,214.88
Upah Gelar
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Kasar ht 0.1000 108,000.00 10,800.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 31,800.00
Jumlah.a+b 196,014.88

H1089 Pas.Keramik Lantai Import 10X20/m2


Bahan
Keramik 10X20 m2 1.1000 112,500.00 123,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 154,920.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 190,870.00

528975646.xls
Page 254 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1090 Pas.Plint Keramik Lantai Import 10X20/m'


Bahan
Keramik 10X20 m2 0.1100 112,500.00 12,375.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 15,620.55
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 23,820.55

H1091 Pas.Keramik Lantai Import 20X20/m2


Bahan
Keramik 20X20 m2 1.1000 150,000.00 165,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 196,170.00
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 228,370.00

H1092 Pas.Plint Keramik Lantai Import 10X20/m'


Bahan
Keramik 20X20 m2 0.1100 150,000.00 16,500.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 19,745.55
Upah Pasang
Kenek ht 0.0500 90,000.00 4,500.00
Tk.Batu Halus ht 0.0250 90,000.00 2,250.00
Kep.Tukang ht 0.0050 108,000.00 540.00
Mandor ht 0.0017 126,000.00 210.00
Jumlah.b 7,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 29,445.55

H1093 Pas.Keramik Lantai Import 30X30/m2


Bahan
Keramik 30X30 m2 1.1000 150,000.00 165,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 196,170.00
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00

528975646.xls
Page 255 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 220,870.00

H1094 Pas.Plint Keramik Lantai Import 10X30/m'


Bahan
Keramik 30X30 m2 0.1650 150,000.00 24,750.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 27,995.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 38,445.55

H1095 Pas.Keramik Lantai Import 40X40/m2


Bahan
Keramik 40x40 m2 1.0500 300,000.00 315,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 342,420.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 363,370.00

H1096 Pas.Plint Keramik Lantai Import 10X40/m'


Bahan
Keramik 40X40 m2 0.2640 300,000.00 79,200.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 81,645.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 90,945.55

H1097 Pas.Keramik Lantai Import 50X50/m2


Bahan
Keramik 50x50 m2 1.0500 375,000.00 393,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 421,170.00

528975646.xls
Page 256 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 442,120.00

H1098 Pas.Plint Keramik Lantai Import 10X50/m'


Bahan
Keramik 50X50 m2 0.2640 375,000.00 99,000.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 101,445.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 110,745.55

H1099 Pas.Keramik Lantai Import 60X60/m2


Bahan
Keramik 60x60 m2 1.0500 180,000.00 189,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 216,420.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 237,370.00

H1100 Pas.Plint Keramik Lantai Import 10X60/m'


Bahan
Keramik 60X60 m2 0.2640 180,000.00 47,520.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 49,965.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 59,265.55

528975646.xls
Page 257 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1101 Pas.Keramik Lantai Lokal 10X20/m2 Essenza


Bahan
Keramik 10X20 m2 1.1000 187,500.00 206,250.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 237,420.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 273,370.00

H1102 Pas.Plint Keramik Lantai Lokal 10X20/m' Essenza


Bahan
Keramik 10X20 m2 0.1100 187,500.00 20,625.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 23,870.55
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 32,070.55

H1103 Pas.Keramik Lantai Lokal 20X20/m2 Essenza


Bahan
Keramik 20X20 m2 1.1000 225,000.00 247,500.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 278,670.00
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 310,870.00

H1104 Pas.Plint Keramik Lantai Lokal 10X20/m' Essenza


Bahan
Keramik 20X20 m2 0.1100 225,000.00 24,750.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 27,995.55
Upah Pasang
Kenek ht 0.0500 90,000.00 4,500.00
Tk.Batu Halus ht 0.0250 90,000.00 2,250.00
Kep.Tukang ht 0.0050 108,000.00 540.00
Mandor ht 0.0017 126,000.00 210.00
Jumlah.b 7,500.00

528975646.xls
Page 258 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 37,695.55

H1105 Pas.Keramik Lantai Lokal 30X30/m2 Essenza


Bahan
Keramik 30X30 m2 1.1000 150,000.00 165,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 196,170.00
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 220,870.00

H1106 Pas.Plint Keramik Lantai Lokal 10X30/m' Essenza


Bahan
Keramik 30X30 m2 0.1650 150,000.00 24,750.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 27,995.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 38,445.55

H1107 Pas.Keramik Lantai Lokal 40X40/m2 Essenza


Bahan
Keramik 40x40 m2 1.0500 300,000.00 315,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 342,420.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 363,370.00

H1108 Pas.Plint Keramik Lantai Lokal 10X40/m' Essenza


Bahan
Keramik 40X40 m2 0.2640 300,000.00 79,200.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 81,645.55

528975646.xls
Page 259 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 90,945.55

H1109 Pas.Keramik Lantai Lokal 50X50/m2 Essenza


Bahan
Keramik 50x50 m2 1.0500 337,500.00 354,375.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 381,795.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 402,745.00

H1110 Pas.Plint Keramik Lantai Lokal 10X50/m' Essenza


Bahan
Keramik 50X50 m2 0.2640 337,500.00 89,100.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 91,545.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 100,845.55

H1111 Pas.Keramik Lantai Lokal 60X60/m2 Essenza


Bahan
Keramik 60x60 m2 1.0500 375,000.00 393,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 421,170.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 442,120.00

528975646.xls
Page 260 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1112 Pas.Plint Keramik Lantai Lokal 10X60/m' Essenza


Bahan
Keramik 60X60 m2 0.2640 375,000.00 99,000.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 101,445.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 110,745.55

H1113 Pas.Keramik Lantai Lokal 10X20/m2 Ikad


Bahan
Keramik 10X20 m2 1.1000 45,000.00 49,500.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 80,670.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 116,620.00

H1114 Pas.Plint Keramik Lantai Lokal 10X20/m' Ikad


Bahan
Keramik 10X20 m2 0.1100 45,000.00 4,950.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 8,195.55
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 16,395.55

H1115 Pas.Keramik Lantai Lokal 20X20/m2 Ikad


Bahan
Keramik 20X20 m2 1.1000 52,500.00 57,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 88,920.00
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00

528975646.xls
Page 261 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 121,120.00

H1116 Pas.Plint Keramik Lantai Lokal 10X20/m' Ikad


Bahan
Keramik 20X20 m2 0.1100 52,500.00 5,775.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 9,020.55
Upah Pasang
Kenek ht 0.0500 90,000.00 4,500.00
Tk.Batu Halus ht 0.0250 90,000.00 2,250.00
Kep.Tukang ht 0.0050 108,000.00 540.00
Mandor ht 0.0017 126,000.00 210.00
Jumlah.b 7,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 18,720.55

H1117 Pas.Keramik Lantai Lokal 30X30/m2 Ikad


Bahan
Keramik 30X30 m2 1.1000 60,000.00 66,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 97,170.00
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 121,870.00

H1118 Pas.Plint Keramik Lantai Lokal 10X30/m' Ikad


Bahan
Keramik 30X30 m2 0.1650 60,000.00 9,900.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 13,145.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 23,595.55

H1119 Pas.Keramik Lantai Lokal 40X40/m2 Ikad


Bahan
Keramik 40x40 m2 1.0500 75,000.00 78,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 106,170.00

528975646.xls
Page 262 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 127,120.00

H1120 Pas.Plint Keramik Lantai Lokal 10X40/m' Ikad


Bahan
Keramik 40X40 m2 0.2640 75,000.00 19,800.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 22,245.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 31,545.55

H1121 Pas.Keramik Lantai Lokal 50X50/m2 Ikad


Bahan
Keramik 50x50 m2 1.0500 90,000.00 94,500.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 121,920.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 142,870.00

H1122 Pas.Plint Keramik Lantai Lokal 10X50/m' Ikad


Bahan
Keramik 50X50 m2 0.2640 90,000.00 23,760.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 26,205.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 35,505.55

528975646.xls
Page 263 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1123 Pas.Keramik Lantai Lokal 60X60/m2 Ikad


Bahan
Keramik 60x60 m2 1.0500 112,500.00 118,125.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 145,545.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 166,495.00

H1124 Pas.Plint Keramik Lantai Lokal 10X60/m' Ikad


Bahan
Keramik 60X60 m2 0.2640 112,500.00 29,700.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 32,145.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 41,445.55

H1125 Pas.Keramik Lantai Lokal 10X20/m2 Mulia


Bahan
Keramik 10X20 m2 1.1000 45,000.00 49,500.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 80,670.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 116,620.00

H1126 Pas.Plint Keramik Lantai Lokal 10X20/m' Mulia


Bahan
Keramik 10X20 m2 0.1100 45,000.00 4,950.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 8,195.55
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00

528975646.xls
Page 264 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 16,395.55

H1127 Pas.Keramik Lantai Lokal 20X20/m2 Mulia


Bahan
Keramik 20X20 m2 1.1000 52,500.00 57,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 88,920.00
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 121,120.00

H1128 Pas.Plint Keramik Lantai Lokal 10X20/m' Mulia


Bahan
Keramik 20X20 m2 0.1100 52,500.00 5,775.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 9,020.55
Upah Pasang
Kenek ht 0.0500 90,000.00 4,500.00
Tk.Batu Halus ht 0.0250 90,000.00 2,250.00
Kep.Tukang ht 0.0050 108,000.00 540.00
Mandor ht 0.0017 126,000.00 210.00
Jumlah.b 7,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 18,720.55

H1129 Pas.Keramik Lantai Lokal 30X30/m2 Mulia


Bahan
Keramik 30X30 m2 1.1000 60,000.00 66,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 97,170.00
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 121,870.00

H1130 Pas.Plint Keramik Lantai Lokal 10X30/m' Mulia


Bahan
Keramik 30X30 m2 0.1650 60,000.00 9,900.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 13,145.55

528975646.xls
Page 265 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 23,595.55

H1131 Pas.Keramik Lantai Lokal 40X40/m2 Mulia


Bahan
Keramik 40x40 m2 1.0500 67,500.00 70,875.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 98,295.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 119,245.00

H1132 Pas.Plint Keramik Lantai Lokal 10X40/m' Mulia


Bahan
Keramik 40X40 m2 0.2640 67,500.00 17,820.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 20,265.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 29,565.55

H1133 Pas.Keramik Lantai Lokal 50X50/m2 Mulia


Bahan
Keramik 50x50 m2 1.0500 75,000.00 78,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 106,170.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 127,120.00

528975646.xls
Page 266 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1134 Pas.Plint Keramik Lantai Lokal 10X50/m' Mulia


Bahan
Keramik 50X50 m2 0.2640 75,000.00 19,800.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 22,245.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 31,545.55

H1135 Pas.Keramik Lantai Lokal 60X60/m2 Mulia


Bahan
Keramik 60x60 m2 1.0500 90,000.00 94,500.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 121,920.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 142,870.00

H1136 Pas.Plint Keramik Lantai Lokal 10X60/m' Mulia


Bahan
Keramik 60X60 m2 0.2640 90,000.00 23,760.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 26,205.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 35,505.55

H1137 Pas.Keramik Lantai Lokal 10X20/m2 Platinum


Bahan
Keramik 10X20 m2 1.1000 52,500.00 57,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 88,920.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00

528975646.xls
Page 267 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 124,870.00

H1138 Pas.Plint Keramik Lantai Lokal 10X20/m' Platinum


Bahan
Keramik 10X20 m2 0.1100 52,500.00 5,775.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 9,020.55
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 17,220.55

H1139 Pas.Keramik Lantai Lokal 20X20/m2 Platinum


Bahan
Keramik 20X20 m2 1.1000 60,000.00 66,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 97,170.00
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 129,370.00

H1140 Pas.Plint Keramik Lantai Lokal 10X20/m' Platinum


Bahan
Keramik 20X20 m2 0.1100 60,000.00 6,600.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 9,845.55
Upah Pasang
Kenek ht 0.0500 90,000.00 4,500.00
Tk.Batu Halus ht 0.0250 90,000.00 2,250.00
Kep.Tukang ht 0.0050 108,000.00 540.00
Mandor ht 0.0017 126,000.00 210.00
Jumlah.b 7,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 19,545.55

H1141 Pas.Keramik Lantai Lokal 30X30/m2 Platinum


Bahan
Keramik 30X30 m2 1.1000 67,500.00 74,250.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 105,420.00

528975646.xls
Page 268 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 130,120.00

H1142 Pas.Plint Keramik Lantai Lokal 10X30/m' Platinum


Bahan
Keramik 30X30 m2 0.1650 67,500.00 11,137.50
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 14,383.05
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 24,833.05

H1143 Pas.Keramik Lantai Lokal 40X40/m2 Platinum


Bahan
Keramik 40x40 m2 1.0500 75,000.00 78,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 106,170.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 127,120.00

H1144 Pas.Plint Keramik Lantai Lokal 10X40/m' Platinum


Bahan
Keramik 40X40 m2 0.2640 75,000.00 19,800.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 22,245.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 31,545.55

528975646.xls
Page 269 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1145 Pas.Keramik Lantai Lokal 50X50/m2 Platinum


Bahan
Keramik 50x50 m2 1.0500 112,500.00 118,125.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 145,545.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 166,495.00

H1146 Pas.Plint Keramik Lantai Lokal 10X50/m' Platinum


Bahan
Keramik 50X50 m2 0.2640 112,500.00 29,700.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 32,145.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 41,445.55

H1147 Pas.Keramik Lantai Lokal 60X60/m2 Platinum


Bahan
Keramik 60x60 m2 1.0500 120,000.00 126,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 153,420.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 174,370.00

H1148 Pas.Plint Keramik Lantai Lokal 10X60/m' Platinum


Bahan
Keramik 60X60 m2 0.2640 120,000.00 31,680.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 34,125.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00

528975646.xls
Page 270 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 43,425.55

H1149 Pas.Keramik Lantai Lokal 10X20/m2 Roman


Bahan
Keramik 10X20 m2 1.1000 45,000.00 49,500.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 80,670.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 116,620.00

H1150 Pas.Plint Keramik Lantai Lokal 10X20/m' Roman


Bahan
Keramik 10X20 m2 0.1100 45,000.00 4,950.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 8,195.55
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 16,395.55

H1151 Pas.Keramik Lantai Lokal 20X20/m2 Roman


Bahan
Keramik 20X20 m2 1.1000 52,500.00 57,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 88,920.00
Upah Pasang
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 30,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 121,120.00

H1152 Pas.Plint Keramik Lantai Lokal 10X20/m' Roman


Bahan
Keramik 20X20 m2 0.1100 52,500.00 5,775.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 9,020.55

528975646.xls
Page 271 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.0500 90,000.00 4,500.00
Tk.Batu Halus ht 0.0250 90,000.00 2,250.00
Kep.Tukang ht 0.0050 108,000.00 540.00
Mandor ht 0.0017 126,000.00 210.00
Jumlah.b 7,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 18,720.55

H1153 Pas.Keramik Lantai Lokal 30X30/m2 Roman


Bahan
Keramik 30X30 m2 1.1000 60,000.00 66,000.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 2.0000 7,500.00 15,000.00
Jumlah.a 97,170.00
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 121,870.00

H1154 Pas.Plint Keramik Lantai Lokal 10X30/m' Roman


Bahan
Keramik 30X30 m2 0.1650 60,000.00 9,900.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 7,500.00 1,500.00
Jumlah.a 13,145.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 23,595.55

H1155 Pas.Keramik Lantai Lokal 40X40/m2 Roman


Bahan
Keramik 40x40 m2 1.0500 75,000.00 78,750.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 106,170.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 127,120.00

528975646.xls
Page 272 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1156 Pas.Plint Keramik Lantai Lokal 10X40/m' Roman


Bahan
Keramik 40X40 m2 0.2640 75,000.00 19,800.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 22,245.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 31,545.55

H1157 Pas.Keramik Lantai Lokal 50X50/m2 Roman


Bahan
Keramik 50x50 m2 1.0500 90,000.00 94,500.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 121,920.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 142,870.00

H1158 Pas.Plint Keramik Lantai Lokal 10X50/m' Roman


Bahan
Keramik 50X50 m2 0.2640 90,000.00 23,760.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 26,205.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 35,505.55

H1159 Pas.Keramik Lantai Lokal 60X60/m2 Roman


Bahan
Keramik 60x60 m2 1.0500 112,500.00 118,125.00
Spesi 1:6 m3 0.0275 588,000.00 16,170.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 145,545.00
Upah Pasang
Kenek ht 0.1250 90,000.00 11,250.00
Tk.Batu Halus ht 0.0625 90,000.00 5,625.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 18,750.00

528975646.xls
Page 273 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.5000 3,000.00 1,500.00
Jumlah.c 2,200.00
Jumlah.a+b+c 166,495.00

H1160 Pas.Plint Keramik Lantai Lokal 10X60/m' Roman


Bahan
Keramik 60X60 m2 0.2640 112,500.00 29,700.00
Spesi 1:4 m3 0.0027 646,500.00 1,745.55
Semen Pengisi kg 0.2000 3,500.00 700.00
Jumlah.a 32,145.55
Upah Pasang
Kenek ht 0.0550 90,000.00 4,950.00
Tk.Batu Halus ht 0.0275 90,000.00 2,475.00
Kep.Tukang ht 0.0055 108,000.00 594.00
Mandor ht 0.0018 126,000.00 231.00
Jumlah.b 8,250.00
Alat Bantu
Ember bh 0.0200 2,500.00 50.00
Pacul bh 0.0100 25,000.00 250.00
Mesin Potong m' 0.5000 1,500.00 750.00
Jumlah.c 1,050.00
Jumlah.a+b+c 41,445.55

H1161 Pas.Marmer Lantai Import 40X40/m2 ex.Italia


Bahan
Marmer 40x40 m2 1.0500 900,000.00 945,000.00
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 976,619.25
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 1,018,194.25

H1162 Pas.Plint Marmer Import 10X40/m' ex.Italia


Bahan
Marmer 10x40 m2 0.1100 900,000.00 99,000.00
Spesi 1:3 m3 0.0033 686,250.00 2,264.63
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 102,389.63
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 112,464.63

H1163 Pas.Marmer Lantai Import 50X50/m2 ex.Italia


Bahan
Marmer 50x50 m2 1.0500 1,050,000.00 1,102,500.00
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 1,134,119.25

528975646.xls
Page 274 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 1,175,694.25

H1164 Pas.Plint Marmer Import 10X50/m' ex.Italia


Bahan
Marmer 10x50 m2 0.1100 1,050,000.00 115,500.00
Spesi 1:3 m3 0.0033 686,250.00 2,264.63
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 118,889.63
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 128,964.63

H1165 Pas.Marmer Lantai Import 60X60/m2 ex.Italia


Bahan
Marmer 60x60 m2 1.0500 1,200,000.00 1,260,000.00
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 1,291,619.25
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 1,333,194.25

H1166 Pas.Plint Marmer Import 10X60/m' ex.Italia


Bahan
Marmer 10x60 m2 0.1100 1,200,000.00 132,000.00
Spesi 1:3 m3 0.0033 686,250.00 2,264.63
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 135,389.63
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 145,464.63

528975646.xls
Page 275 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1167 Pas.Marmer Lantai Import Slab/m2 ex.Italia


Bahan
Marmer Slab m2 1.0500 1,800,000.00 1,890,000.00
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 1,921,619.25
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 1,963,194.25

H1168 Pas.Plint Marmer Import 10X100/m' ex.Italia


Bahan
Marmer 10x100 m2 0.1100 1,800,000.00 198,000.00
Spesi 1:3 m3 0.0033 686,250.00 2,264.63
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 201,389.63
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 211,464.63

H1167 Pas.Marmer Lantai Import 40X40/m2 ex.RRC


Bahan
Marmer 40x40 m2 1.0500 750,000.00 787,500.00
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 819,119.25
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 860,694.25

H1168 Pas.Plint Marmer Import 10X40/m' ex.RRC


Bahan
Marmer 10x40 m2 0.1100 750,000.00 82,500.00
Spesi 1:3 m3 0.0033 686,250.00 2,264.63
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 85,889.63
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00

528975646.xls
Page 276 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 95,964.63

H1169 Pas.Marmer Lantai Import 50X50/m2 ex.RRC


Bahan
Marmer 50x50 m2 1.0500 900,000.00 945,000.00
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 976,619.25
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 1,018,194.25

H1170 Pas.Plint Marmer Import 10X50/m' ex.RRC


Bahan
Marmer 10x50 m2 0.1100 900,000.00 99,000.00
Spesi 1:3 m3 0.0033 686,250.00 2,264.63
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 102,389.63
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 112,464.63

H1171 Pas.Marmer Lantai Import 60X60/m2 ex.RRC


Bahan
Marmer 60x60 m2 1.0500 1,050,000.00 1,102,500.00
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 1,134,119.25
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 1,175,694.25

H1172 Pas.Plint Marmer Import 10X60/m' ex.RRC


Bahan
Marmer 10x60 m2 0.1100 1,050,000.00 115,500.00
Spesi 1:3 m3 0.0033 686,250.00 2,264.63
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 118,889.63

528975646.xls
Page 277 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 128,964.63

H1173 Pas.Marmer Lantai Import Slab/m2 ex.RRC


Bahan
Marmer Slab m2 1.0500 1,500,000.00 1,575,000.00
Spesi 1:5 m3 0.0330 617,250.00 20,369.25
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 1,606,619.25
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 1,648,194.25

H1174 Pas.Plint Marmer Import 10X100/m' ex.RRC


Bahan
Marmer 10x100 m2 0.1100 1,500,000.00 165,000.00
Spesi 1:3 m3 0.0033 686,250.00 2,264.63
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 168,389.63
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 178,464.63

H1175 Pas.Marmer Lantai Lokal 40X40/m2 Bangun Lampung Jaya


Bahan
Marmer 40x40 m2 1.0500 450,000.00 472,500.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 503,154.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 544,729.00

528975646.xls
Page 278 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1176 Pas.Plint Marmer Lokal 10X40/m' BLJ


Bahan
Marmer 10x40 m2 0.1100 450,000.00 49,500.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 52,758.45
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 62,833.45

H1177 Pas.Marmer Lantai 50X50/m2 BLJ


Bahan
Marmer 50x50 m2 1.0500 525,000.00 551,250.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 578,154.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 617,279.00

H1178 Pas.Plint Marmer 10X50/m' BLJ


Bahan
Marmer 10x50 m2 0.1100 525,000.00 57,750.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 60,633.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 71,633.45

H1179 Pas.Marmer Lantai 60X60/m2 BLJ


Bahan
Marmer 60x60 m2 1.0500 600,000.00 630,000.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 656,904.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00

528975646.xls
Page 279 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 696,029.00

H1180 Pas.Plint Marmer 10X60/m' BLJ


Bahan
Marmer 10x60 m2 0.1100 600,000.00 66,000.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 68,883.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 79,883.45

H1181 Pas.Marmer Lantai Slab/m2 BLJ


Bahan
Marmer Slab m2 1.0500 1,125,000.00 1,181,250.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,208,154.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 1,247,279.00

H1182 Pas.Plint Marmer 10X100/m' BLJ


Bahan
Marmer 10x100 m2 0.1100 1,125,000.00 123,750.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 126,633.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 137,633.45

H1183 Pas.Marmer Lantai Lokal 40X40/m2 Citatah


Bahan
Marmer 40x40 m2 1.0500 375,000.00 393,750.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 424,404.00

528975646.xls
Page 280 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 465,979.00

H1184 Pas.Plint Marmer Lokal 10X40/m' Citatah


Bahan
Marmer 10x40 m2 0.1100 375,000.00 41,250.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 44,508.45
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 54,583.45

H1185 Pas.Marmer Lantai 50X50/m2 Citatah


Bahan
Marmer 50x50 m2 1.0500 450,000.00 472,500.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 499,404.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 538,529.00

H1186 Pas.Plint Marmer 10X50/m' Citatah


Bahan
Marmer 10x50 m2 0.1100 450,000.00 49,500.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 52,383.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 63,383.45

528975646.xls
Page 281 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1187 Pas.Marmer Lantai 60X60/m2 Citatah


Bahan
Marmer 60x60 m2 1.0500 525,000.00 551,250.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 578,154.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 617,279.00

H1188 Pas.Plint Marmer 10X60/m' Citatah


Bahan
Marmer 10x60 m2 0.1100 525,000.00 57,750.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 60,633.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 71,633.45

H1189 Pas.Marmer Lantai Slab/m2 Citatah


Bahan
Marmer Slab m2 1.0500 1,050,000.00 1,102,500.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,129,404.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 1,168,529.00

H1190 Pas.Plint Marmer 10X100/m' Citatah


Bahan
Marmer 10x100 m2 0.1100 1,050,000.00 115,500.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 118,383.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00

528975646.xls
Page 282 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 129,383.45

H1191 Pas.Marmer Lantai Lokal 40X40/m2 Indoprima


Bahan
Marmer 40x40 m2 1.0500 337,500.00 354,375.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 385,029.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 426,604.00

H1192 Pas.Plint Marmer Lokal 10X40/m' Indoprima


Bahan
Marmer 10x40 m2 0.1100 337,500.00 37,125.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 40,383.45
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 50,458.45

H1193 Pas.Marmer Lantai 50X50/m2 Indoprima


Bahan
Marmer 50x50 m2 1.0500 412,500.00 433,125.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 460,029.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 499,154.00

H1194 Pas.Plint Marmer 10X50/m' Indoprima


Bahan
Marmer 10x50 m2 0.1100 412,500.00 45,375.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 48,258.45

528975646.xls
Page 283 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 59,258.45

H1195 Pas.Marmer Lantai 60X60/m2 Indoprima


Bahan
Marmer 60x60 m2 1.0500 487,500.00 511,875.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 538,779.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 577,904.00

H1196 Pas.Plint Marmer 10X60/m' Indoprima


Bahan
Marmer 10x60 m2 0.1100 487,500.00 53,625.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 56,508.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 67,508.45

H1197 Pas.Marmer Lantai Slab/m2 Indoprima


Bahan
Marmer Slab m2 1.0500 1,050,000.00 1,102,500.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,129,404.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 1,168,529.00

528975646.xls
Page 284 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1198 Pas.Plint Marmer 10X100/m' Indoprima


Bahan
Marmer 10x100 m2 0.1100 1,050,000.00 115,500.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 118,383.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 129,383.45

H1199 Pas.Marmer Lantai Lokal 40X40/m2 Pola Marmer


Bahan
Marmer 40x40 m2 1.0500 262,500.00 275,625.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 306,279.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 347,854.00

H1200 Pas.Plint Marmer Lokal 10X40/m' Pola Marmer


Bahan
Marmer 10x40 m2 0.1100 262,500.00 28,875.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 32,133.45
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 42,208.45

H1201 Pas.Marmer Lantai 50X50/m2 Pola Marmer


Bahan
Marmer 50x50 m2 1.0500 337,500.00 354,375.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 381,279.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00

528975646.xls
Page 285 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 420,404.00

H1202 Pas.Plint Marmer 10X50/m' Pola Marmer


Bahan
Marmer 10x50 m2 0.1100 337,500.00 37,125.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 40,008.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 51,008.45

H1203 Pas.Marmer Lantai 60X60/m2 Pola Marmer


Bahan
Marmer 60x60 m2 1.0500 412,500.00 433,125.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 460,029.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 499,154.00

H1204 Pas.Plint Marmer 10X60/m' Pola Marmer


Bahan
Marmer 10x60 m2 0.1100 412,500.00 45,375.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 48,258.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 59,258.45

H1205 Pas.Marmer Lantai Slab/m2 Pola Marmer


Bahan
Marmer Slab m2 1.0500 975,000.00 1,023,750.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,050,654.00

528975646.xls
Page 286 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 1,089,779.00

H1206 Pas.Plint Marmer 10X100/m' Pola Marmer


Bahan
Marmer 10x100 m2 0.1100 975,000.00 107,250.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 110,133.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 121,133.45

H1207 Pas.Marmer Lantai Lokal 40X40/m2 Ujung Pandang


Bahan
Marmer 40x40 m2 1.0500 300,000.00 315,000.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.5000 7,500.00 11,250.00
Jumlah.a 345,654.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 387,229.00

H1208 Pas.Plint Marmer Lokal 10X40/m' Ujung Pandang


Bahan
Marmer 10x40 m2 0.1100 300,000.00 33,000.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1500 7,500.00 1,125.00
Jumlah.a 36,258.45
Upah Pasang
Kenek ht 0.0400 90,000.00 3,600.00
Tk.Batu Halus ht 0.0200 90,000.00 1,800.00
Kep.Tukang ht 0.0040 108,000.00 432.00
Mandor ht 0.0013 126,000.00 168.00
Jumlah.b 6,000.00
Alat Bantu
Ember bh 0.0200 10,000.00 200.00
Pacul bh 0.0100 50,000.00 500.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 4,075.00
Jumlah.a+b+c 46,333.45

528975646.xls
Page 287 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1209 Pas.Marmer Lantai 50X50/m2 Ujung Pandang


Bahan
Marmer 50x50 m2 1.0500 375,000.00 393,750.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 420,654.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 459,779.00

H1210 Pas.Plint Marmer 10X50/m' Ujung Pandang


Bahan
Marmer 10x50 m2 0.1100 375,000.00 41,250.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 44,133.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 55,133.45

H1211 Pas.Marmer Lantai 60X60/m2 Ujung Pandang


Bahan
Marmer 60x60 m2 1.0500 450,000.00 472,500.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 499,404.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 538,529.00

H1212 Pas.Plint Marmer 10X60/m' Ujung Pandang


Bahan
Marmer 10x60 m2 0.1100 450,000.00 49,500.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 52,383.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00

528975646.xls
Page 288 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 63,383.45

H1213 Pas.Marmer Lantai Slab/m2 Ujung Pandang


Bahan
Marmer Slab m2 1.0500 900,000.00 945,000.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 971,904.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 1,011,029.00

H1214 Pas.Plint Marmer 10X100/m' Ujung Pandang


Bahan
Marmer 10x100 m2 0.1100 900,000.00 99,000.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 101,883.45
Upah Pasang
Kenek ht 0.0450 90,000.00 4,050.00
Tk.Batu Halus ht 0.0225 90,000.00 2,025.00
Kep.Tukang ht 0.0045 108,000.00 486.00
Mandor ht 0.0015 126,000.00 189.00
Jumlah.b 6,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.5000 4,500.00 2,250.00
Jumlah.c 4,250.00
Jumlah.a+b+c 112,883.45

H1215 Pas.Granit Lantai Import 40x40/m2 ex.Italia


Bahan
Granit 40x40 m2 1.0500 600,000.00 630,000.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 656,904.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 699,779.00

H1216 Pas.Plint Granit Lantai Import 10x40/m' ex.Italia


Bahan
Granit 40x40 m2 0.1100 600,000.00 66,000.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 68,883.45

528975646.xls
Page 289 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 111,758.45

H1217 Pas.Granit Lantai Import 50x50/m2 ex.Italia


Bahan
Granit 50x50 m2 1.0500 675,000.00 708,750.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 735,654.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 774,779.00

H1218 Pas.Plint Granit Lantai Import 10x50/m' ex.Italia


Bahan
Granit 50x50 m2 0.1100 675,000.00 74,250.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 77,133.45
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 105,008.45

H1219 Pas.Granit Lantai Import 60x60/m2 ex.Italia


Bahan
Granit 60x60 m2 1.0500 825,000.00 866,250.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 893,154.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 932,279.00

528975646.xls
Page 290 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1220 Pas.Plint Granit Lantai Import 10x60/m' ex.Italia


Bahan
Granit 60x60 m2 0.1100 825,000.00 90,750.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 93,633.45
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 121,508.45

H1221 Pas.Granit Lantai Import Slab/m2 ex.Italia


Bahan
Granit Slab m2 1.0500 1,350,000.00 1,417,500.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,444,404.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 1,483,529.00

H1222 Pas.Plint Granit Lantai Import 10x100/m' ex.Italia


Bahan
Granito Tile 10x100 m2 0.1100 1,350,000.00 148,500.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 151,383.45
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 179,258.45

H1223 Pas.Granit Lantai Import 40x40/m2 ex.RRC


Bahan
Granit 40x40 m2 1.0500 525,000.00 551,250.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 578,154.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00

528975646.xls
Page 291 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 621,029.00

H1224 Pas.Plint Granit Lantai Import 10x40/m' ex.RRC


Bahan
Granit 40x40 m2 0.1100 525,000.00 57,750.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 60,633.45
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 103,508.45

H1225 Pas.Granit Lantai Import 50x50/m2 ex.RRC


Bahan
Granit 50x50 m2 1.0500 600,000.00 630,000.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 656,904.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 696,029.00

H1226 Pas.Plint Granit Lantai Import 10x50/m' ex.RRC


Bahan
Granit 50x50 m2 0.1100 600,000.00 66,000.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 68,883.45
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 96,758.45

H1227 Pas.Granit Lantai Import 60x60/m2 ex.RRC


Bahan
Granit 60x60 m2 1.0500 750,000.00 787,500.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 814,404.00

528975646.xls
Page 292 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 853,529.00

H1228 Pas.Plint Granit Lantai Import 10x60/m' ex.RRC


Bahan
Granit 60x60 m2 0.1100 750,000.00 82,500.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 85,383.45
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 113,258.45

H1229 Pas.Granit Lantai Import Slab/m2 ex.RRC


Bahan
Granit Slab m2 1.0500 1,200,000.00 1,260,000.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 1,286,904.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 1,326,029.00

H1230 Pas.Plint Granit Lantai Import 10x100/m' ex.RRC


Bahan
Granito Tile 10x100 m2 0.1100 1,200,000.00 132,000.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 134,883.45
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 162,758.45

528975646.xls
Page 293 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

H1231 Pas.Granit Lantai Lokal 40x40/m2 Granito


Bahan
Granito 40x40 m2 1.0500 300,000.00 315,000.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 341,904.00
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 384,779.00

H1232 Pas.Plint Granit Lantai Lokal 10x40/m' Granito


Bahan
Granito 40x40 m2 0.1100 300,000.00 33,000.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 35,883.45
Upah Pasang
Kenek ht 0.2500 90,000.00 22,500.00
Tk.Batu Halus ht 0.1250 90,000.00 11,250.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 37,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 78,758.45

H1233 Pas.Granit Lantai Lokal 50x50/m2 Granito


Bahan
Granito 50x50 m2 1.0500 375,000.00 393,750.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 420,654.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 459,779.00

H1234 Pas.Granit Lantai Lokal 10x50/m' Granito


Bahan
Granito 50x50 m2 0.1100 375,000.00 41,250.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 44,133.45
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00

528975646.xls
Page 294 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 72,008.45

H1235 Pas.Granit Lantai Lokal 60x60/m2 Granito


Bahan
Granito 60x60 m2 1.0500 450,000.00 472,500.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 499,404.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 538,529.00

H1236 Pas.Granit Lantai Lokal 10x60/m' Granito


Bahan
Granito 60x60 m2 0.1100 450,000.00 49,500.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 52,383.45
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 80,258.45

H1237 Pas.Granit Lantai Lokal Slab/m2 Granito


Bahan
Granit Slab m2 1.0500 750,000.00 787,500.00
Spesi 1:6 m3 0.0330 588,000.00 19,404.00
Semen Pengisi kg 1.0000 7,500.00 7,500.00
Jumlah.a 814,404.00
Upah Pasang
Kenek ht 0.2250 90,000.00 20,250.00
Tk.Batu Halus ht 0.1125 90,000.00 10,125.00
Kep.Tukang ht 0.0225 108,000.00 2,430.00
Mandor ht 0.0075 126,000.00 945.00
Jumlah.b 33,750.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 853,529.00

H1238 Pas.Plint Granit Lantai Lokal 10x100/m' Granito


Bahan
Granito Tile 10x100 m2 0.1100 750,000.00 82,500.00
Spesi 1:4 m3 0.0033 646,500.00 2,133.45
Semen Pengisi kg 0.1000 7,500.00 750.00
Jumlah.a 85,383.45

528975646.xls
Page 295 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Kenek ht 0.1500 90,000.00 13,500.00
Tk.Batu Halus ht 0.0750 90,000.00 6,750.00
Kep.Tukang ht 0.0150 108,000.00 1,620.00
Mandor ht 0.0050 126,000.00 630.00
Jumlah.b 22,500.00
Alat Bantu
Ember bh 0.1000 10,000.00 1,000.00
Pacul bh 0.0200 50,000.00 1,000.00
Mesin Potong m' 0.7500 4,500.00 3,375.00
Jumlah.c 5,375.00
Jumlah.a+b+c 113,258.45

H1239 Finish.Locis Kosen/bh


Bahan
Semen sak 0.0055 52,500.00 288.75
Jumlah.a 288.75
Upah Aci
Kenek ht 0.2000 90,000.00 18,000.00
Tk.Batu Halus ht 0.1000 90,000.00 9,000.00
Kep.Tukang ht 0.0333 108,000.00 3,600.00
Mandor ht 0.0111 126,000.00 1,400.00
Jumlah.b 32,000.00
Jumlah.a+b 32,288.75

528975646.xls
Page 296 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.PINTU, JENDELA & KACA

Lantai1
I1001 Pintu Full Panel Solid Jati Kwalitet Politur/bh
Bahan
Daun Pintu Beli Jadi bh 1.0000 6,000,000.00 6,000,000.00
Jumlah.a 6,000,000.00
Upah Stel & Pasang
Kenek ht 0.7000 90,000.00 63,000.00
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 161,000.00
Jumlah.a+b 6,161,000.00

I1002 Pintu Full Panel Solid Jati Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 5,250,000.00 5,250,000.00
Jumlah.a 5,250,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 5,399,500.00

528975646.xls
Page 297 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1003 Pintu Full Panel Solid Bangkirai Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 900,000.00 900,000.00
Jumlah.a 900,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 1,049,500.00

I1004 Pintu Full Panel Solid Bangkirai Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 888,000.00

528975646.xls
Page 298 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1005 Pintu Full Panel Solid Kamper Samarinda Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 899,500.00

I1006 Pintu Full Panel Solid Kamper Samarinda Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 738,000.00

I1007 Pintu Full Panel Solid Kamper Medan Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 738,000.00

I1008 Pintu Full Panel Solid Kamper Medan Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 576,500.00

I1009 Pintu Full Panel Solid Meranti Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 588,000.00

I1010 Pintu Full Panel Solid Meranti Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 426,500.00

528975646.xls
Page 299 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1011 Pintu Full Panel Solid Nyatoh Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 663,000.00

I1012 Pintu Full Panel Solid Nyatoh Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 501,500.00

I1013 Pintu Full Krepyak Jati Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 6,750,000.00 6,750,000.00
Jumlah.a 6,750,000.00
Upah Stel & Pasang
Kenek ht 0.7000 90,000.00 63,000.00
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 161,000.00
Jumlah.a+b 6,911,000.00

I1014 Pintu Full Krepyak Jati Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 6,000,000.00 6,000,000.00
Jumlah.a 6,000,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 6,149,500.00

I1015 Pintu Full Krepyak Bangkirai Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 1,050,000.00 1,050,000.00
Jumlah.a 1,050,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 1,199,500.00

I1016 Pintu Full Krepyak Bangkirai Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 900,000.00 900,000.00
Jumlah.a 900,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 1,038,000.00

528975646.xls
Page 300 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1017 Pintu Full Krepyak Kamper Samarinda Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 900,000.00 900,000.00
Jumlah.a 900,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 1,049,500.00

I1018 Pintu Full Krepyak Kamper Samarinda Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 888,000.00

I1019 Pintu Full Krepyak Kamper Medan Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 899,500.00

I1020 Pintu Full Krepyak Kamper Medan Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 738,000.00

I1021 Pintu Full Krepyak Meranti Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 749,500.00

I1022 Pintu Full Krepyak Meranti Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 588,000.00

528975646.xls
Page 301 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1023 Pintu Full Krepyak Nyatoh Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 675,000.00 675,000.00
Jumlah.a 675,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 824,500.00

I1024 Pintu Full Krepyak Nyatoh Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 663,000.00

I1025 Pintu Rangka Kaca Jati Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 5,250,000.00 5,250,000.00
Jumlah.a 5,250,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 5,399,500.00

I1026 Pintu Rangka Kaca Jati Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 4,500,000.00 4,500,000.00
Jumlah.a 4,500,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 4,638,000.00

I1027 Pintu Rangka Kaca Bangkirai Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 888,000.00

I1028 Pintu Rangka Kaca Bangkirai Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 726,500.00

528975646.xls
Page 302 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1029 Pintu Rangka Kaca Kamper Samarinda Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 738,000.00

I1030 Pintu Rangka Kaca Kamper Samarinda Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 576,500.00

I1031 Pintu Rangka Kaca Kamper Medan Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 588,000.00

I1032 Pintu Rangka Kaca Kamper Medan Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 426,500.00

I1033 Pintu Rangka Kaca Meranti Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 588,000.00

I1034 Pintu Rangka Kaca Meranti Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 426,500.00

528975646.xls
Page 303 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1035 Pintu Rangka Kaca Nyatoh Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 663,000.00

I1036 Pintu Rangka Kaca Nyatoh Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 501,500.00

I1037 Pintu Panel+Krepyak Jati Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 6,375,000.00 6,375,000.00
Jumlah.a 6,375,000.00
Upah Stel & Pasang
Kenek ht 0.7000 90,000.00 63,000.00
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 161,000.00
Jumlah.a+b 6,536,000.00

I1038 Pintu Panel+Krepyak Jati Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 5,625,000.00 5,625,000.00
Jumlah.a 5,625,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 5,774,500.00

I1039 Pintu Panel+Krepyak Bangkirai Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 975,000.00 975,000.00
Jumlah.a 975,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 1,124,500.00

I1040 Pintu Panel+Krepyak Bangkirai Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 825,000.00 825,000.00
Jumlah.a 825,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 963,000.00

528975646.xls
Page 304 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1041 Pintu Panel+Krepyak Kamper Samarinda Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 825,000.00 825,000.00
Jumlah.a 825,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 974,500.00

I1042 Pintu Panel+Krepyak Kamper Samarinda Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 675,000.00 675,000.00
Jumlah.a 675,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 813,000.00

I1043 Pintu Panel+Krepyak Kamper Medan Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 675,000.00 675,000.00
Jumlah.a 675,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 813,000.00

I1044 Pintu Panel+Krepyak Kamper Medan Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 651,500.00

I1045 Pintu Panel+Krepyak Meranti Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 663,000.00

I1046 Pintu Panel+Krepyak Meranti Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 501,500.00

528975646.xls
Page 305 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1047 Pintu Panel+Krepyak Nyatoh Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 738,000.00

I1048 Pintu Panel+Krepyak Nyatoh Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 576,500.00

I1049 Pintu Panel+Kaca Jati Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 5,625,000.00 5,625,000.00
Jumlah.a 5,625,000.00
Upah Stel & Pasang
Kenek ht 0.7000 90,000.00 63,000.00
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 161,000.00
Jumlah.a+b 5,786,000.00

I1050 Pintu Panel+Kaca Jati Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 4,875,000.00 4,875,000.00
Jumlah.a 4,875,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 5,024,500.00

I1051 Pintu Panel+Kaca Bangkirai Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 825,000.00 825,000.00
Jumlah.a 825,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 974,500.00

I1052 Pintu Panel+Kaca Bangkirai Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 675,000.00 675,000.00
Jumlah.a 675,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 813,000.00

528975646.xls
Page 306 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1053 Pintu Panel+Kaca Kamper Samarinda Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 675,000.00 675,000.00
Jumlah.a 675,000.00
Upah Stel & Pasang
Kenek ht 0.6500 90,000.00 58,500.00
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 149,500.00
Jumlah.a+b 824,500.00

I1054 Pintu Panel+Kaca Kamper Samarinda Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 663,000.00

I1055 Pintu Panel+Kaca Kamper Medan Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 663,000.00

I1056 Pintu Panel+Kaca Kamper Medan Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 501,500.00

I1057 Pintu Panel+Kaca Meranti Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 412,500.00 412,500.00
Jumlah.a 412,500.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 550,500.00

I1058 Pintu Panel+Kaca Meranti Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 262,500.00 262,500.00
Jumlah.a 262,500.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 389,000.00

528975646.xls
Page 307 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1059 Pintu Panel+Kaca Nyatoh Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 588,000.00

I1060 Pintu Panel+Kaca Nyatoh Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 426,500.00

I1061 Pintu Teak Wood Rangka Jati Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 1,875,000.00 1,875,000.00
Jumlah.a 1,875,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 2,013,000.00

I1062 Pintu Teak Wood Rangka Jati Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 1,500,000.00 1,500,000.00
Jumlah.a 1,500,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 1,626,500.00

I1063 Pintu Teak Wood Rangka Bangkirai Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 675,000.00 675,000.00
Jumlah.a 675,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 813,000.00

I1064 Pintu Teak Wood Rangka Bangkirai Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 726,500.00

528975646.xls
Page 308 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1065 Pintu Teak Wood Rangka Kamper Samarinda Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 738,000.00

I1066 Pintu Teak Wood Rangka Kamper Samarinda Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 651,500.00

I1067 Pintu Teak Wood Rangka Kamper Medan Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 663,000.00

I1068 Pintu Teak Wood Rangka Kamper Medan Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 576,500.00

I1069 Pintu Teak Wood Rangka Meranti Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 588,000.00

I1070 Pintu Teak Wood Rangka Meranti Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 501,500.00

528975646.xls
Page 309 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1071 Pintu Teak Wood Rangka Nyatoh Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 513,000.00

I1072 Pintu Teak Wood Rangka Nyatoh Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 426,500.00

I1073 Pintu Teak Melaminto Rangka Jati Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 2,025,000.00 2,025,000.00
Jumlah.a 2,025,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 2,163,000.00

I1074 Pintu Teak Melaminto Rangka Jati Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 1,650,000.00 1,650,000.00
Jumlah.a 1,650,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 1,776,500.00

I1075 Pintu Teak Melaminto Rangka Bangkirai Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 825,000.00 825,000.00
Jumlah.a 825,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 963,000.00

I1076 Pintu Teak Melaminto Rangka Bangkirai Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 876,500.00

528975646.xls
Page 310 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1077 Pintu Teak Melaminto Rangka Kamper Samarinda Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 888,000.00

I1078 Pintu Teak Melaminto Rangka Kamper Samarinda Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 675,000.00 675,000.00
Jumlah.a 675,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 801,500.00

I1079 Pintu Teak Melaminto Rangka Kamper Medan Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 675,000.00 675,000.00
Jumlah.a 675,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 813,000.00

I1080 Pintu Teak Melaminto Rangka Kamper Medan Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 726,500.00

I1081 Pintu Teak Melaminto Rangka Meranti Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 738,000.00

I1082 Pintu Teak Melaminto Rangka Meranti Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 651,500.00

528975646.xls
Page 311 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1083 Pintu Teak Melaminto Rangka Nyatoh Kwalitet Politur/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.6000 90,000.00 54,000.00
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 138,000.00
Jumlah.a+b 663,000.00

I1084 Pintu Teak Melaminto Rangka Nyatoh Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 576,500.00

I1085 Pintu Triplex Rangka Jati Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 1,425,000.00 1,425,000.00
Jumlah.a 1,425,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 1,551,500.00

I1086 Pintu Triplex Rangka Bangkirai Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 651,500.00

I1087 Pintu Triplex Rangka Kamper Samarinda Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 576,500.00

I1088 Pintu Triplex Rangka Kamper Medan Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 501,500.00

528975646.xls
Page 312 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1089 Pintu Triplex Rangka Meranti Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 426,500.00

I1090 Pintu Triplex Rangka Nyatoh Kwalitet Cat/bh


Bahan
Daun Pintu Beli Jadi bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.5500 90,000.00 49,500.00
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 126,500.00
Jumlah.a+b 426,500.00

I1091 Jendela Full Krepyak Jati Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 3,375,000.00 3,375,000.00
Jumlah.a 3,375,000.00
Upah Stel & Pasang
Kenek ht 0.3500 90,000.00 31,500.00
Tk.Kayu Halus ht 0.3500 90,000.00 31,500.00
Kep.Tukang ht 0.1167 108,000.00 12,600.00
Mandor ht 0.0389 126,000.00 4,900.00
Jumlah.b 80,500.00
Jumlah.a+b 3,455,500.00

I1092 Jendela Full Krepyak Jati Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 3,000,000.00 3,000,000.00
Jumlah.a 3,000,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 3,074,750.00

I1093 Jendela Full Krepyak Bangkirai Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 599,750.00

I1094 Jendela Full Krepyak Bangkirai Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 519,000.00

528975646.xls
Page 313 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1095 Jendela Full Krepyak Kamper Samarinda Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 524,750.00

I1096 Jendela Full Krepyak Kamper Samarinda Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 444,000.00

I1097 Jendela Full Krepyak Kamper Medan Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 449,750.00

I1098 Jendela Full Krepyak Kamper Medan Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 369,000.00

I1099 Jendela Full Krepyak Meranti Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 374,750.00

I1100 Jendela Full Krepyak Meranti Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 294,000.00

528975646.xls
Page 314 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1101 Jendela Full Krepyak Nyatoh Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 337,500.00 337,500.00
Jumlah.a 337,500.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 412,250.00

I1102 Jendela Full Krepyak Nyatoh Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 262,500.00 262,500.00
Jumlah.a 262,500.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 331,500.00

I1103 Jendela Rangka Kaca Jati Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 2,625,000.00 2,625,000.00
Jumlah.a 2,625,000.00
Upah Stel & Pasang
Kenek ht 0.3500 90,000.00 31,500.00
Tk.Kayu Halus ht 0.3500 90,000.00 31,500.00
Kep.Tukang ht 0.1167 108,000.00 12,600.00
Mandor ht 0.0389 126,000.00 4,900.00
Jumlah.b 80,500.00
Jumlah.a+b 2,705,500.00

I1104 Jendela Rangka Kaca Jati Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 2,250,000.00 2,250,000.00
Jumlah.a 2,250,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 2,324,750.00

I1105 Jendela Rangka Kaca Bangkirai Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 449,750.00

I1106 Jendela Rangka Kaca Bangkirai Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 369,000.00

528975646.xls
Page 315 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1107 Jendela Rangka Kaca Kamper Samarinda Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 374,750.00

I1108 Jendela Rangka Kaca Kamper Samarinda Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 294,000.00

I1109 Jendela Rangka Kaca Kamper Medan Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 299,750.00

I1110 Jendela Rangka Kaca Kamper Medan Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 150,000.00 150,000.00
Jumlah.a 150,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 219,000.00

I1111 Jendela Rangka Kaca Meranti Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 299,750.00

I1112 Jendela Rangka Kaca Meranti Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 150,000.00 150,000.00
Jumlah.a 150,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 219,000.00

528975646.xls
Page 316 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1113 Jendela Rangka Kaca Nyatoh Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 262,500.00 262,500.00
Jumlah.a 262,500.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 337,250.00

I1114 Jendela Rangka Kaca Nyatoh Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 187,500.00 187,500.00
Jumlah.a 187,500.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 256,500.00

I1115 Jendela Panel+Krepyak Jati Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 3,375,000.00 3,375,000.00
Jumlah.a 3,375,000.00
Upah Stel & Pasang
Kenek ht 0.3500 90,000.00 31,500.00
Tk.Kayu Halus ht 0.3500 90,000.00 31,500.00
Kep.Tukang ht 0.1167 108,000.00 12,600.00
Mandor ht 0.0389 126,000.00 4,900.00
Jumlah.b 80,500.00
Jumlah.a+b 3,455,500.00

I1116 Jendela Panel+Krepyak Jati Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 3,000,000.00 3,000,000.00
Jumlah.a 3,000,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 3,074,750.00

I1117 Jendela Panel+Krepyak Bangkirai Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 599,750.00

I1118 Jendela Panel+Krepyak Bangkirai Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 519,000.00

528975646.xls
Page 317 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1119 Jendela Panel+Krepyak Kamper Samarinda Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 524,750.00

I1120 Jendela Panel+Krepyak Kamper Samarinda Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 444,000.00

I1121 Jendela Panel+Krepyak Kamper Medan Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 449,750.00

I1122 Jendela Panel+Krepyak Kamper Medan Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 369,000.00

I1123 Jendela Panel+Krepyak Meranti Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 374,750.00

I1124 Jendela Panel+Krepyak Meranti Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 294,000.00

528975646.xls
Page 318 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1125 Jendela Panel+Krepyak Nyatoh Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 374,750.00

I1126 Jendela Panel+Krepyak Nyatoh Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 294,000.00

I1127 Jendela Panel+Kaca Jati Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 3,000,000.00 3,000,000.00
Jumlah.a 3,000,000.00
Upah Stel & Pasang
Kenek ht 0.3500 90,000.00 31,500.00
Tk.Kayu Halus ht 0.3500 90,000.00 31,500.00
Kep.Tukang ht 0.1167 108,000.00 12,600.00
Mandor ht 0.0389 126,000.00 4,900.00
Jumlah.b 80,500.00
Jumlah.a+b 3,080,500.00

I1128 Jendela Panel+Kaca Jati Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 2,625,000.00 2,625,000.00
Jumlah.a 2,625,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 2,699,750.00

I1129 Jendela Panel+Kaca Bangkirai Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 449,750.00

I1130 Jendela Panel+Kaca Bangkirai Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 369,000.00

528975646.xls
Page 319 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1131 Jendela Panel+Kaca Kamper Samarinda Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 337,500.00 337,500.00
Jumlah.a 337,500.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 412,250.00

I1132 Jendela Panel+Kaca Kamper Samarinda Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 262,500.00 262,500.00
Jumlah.a 262,500.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 331,500.00

I1133 Jendela Panel+Kaca Kamper Medan Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 262,500.00 262,500.00
Jumlah.a 262,500.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 337,250.00

I1134 Jendela Panel+Kaca Kamper Medan Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 187,500.00 187,500.00
Jumlah.a 187,500.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 256,500.00

I1135 Jendela Panel+Kaca Meranti Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 299,750.00

I1136 Jendela Panel+Kaca Meranti Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 150,000.00 150,000.00
Jumlah.a 150,000.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 219,000.00

528975646.xls
Page 320 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

I1137 Jendela Panel+Kaca Nyatoh Kwalitet Politur/m2


Bahan
Daun Jendela Jadi m2 1.0000 262,500.00 262,500.00
Jumlah.a 262,500.00
Upah Stel & Pasang
Kenek ht 0.3250 90,000.00 29,250.00
Tk.Kayu Halus ht 0.3250 90,000.00 29,250.00
Kep.Tukang ht 0.1083 108,000.00 11,700.00
Mandor ht 0.0361 126,000.00 4,550.00
Jumlah.b 74,750.00
Jumlah.a+b 337,250.00

I1138 Jendela Panel+Kaca Nyatoh Kwalitet Cat/m2


Bahan
Daun Jendela Jadi m2 1.0000 187,500.00 187,500.00
Jumlah.a 187,500.00
Upah Stel & Pasang
Kenek ht 0.3000 90,000.00 27,000.00
Tk.Kayu Halus ht 0.3000 90,000.00 27,000.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 69,000.00
Jumlah.a+b 256,500.00

528975646.xls
Page 321 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.ENGSEL & KUNCI


Lantai1
J1001 Kunci Pintu Masuk Utama/bh Cisa
Bahan
Kunci Pintu bh 1.0000 2,250,000.00 2,250,000.00

528975646.xls
Page 322 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Jumlah.a 2,250,000.00
Upah Pasang
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 98,000.00
Jumlah.a+b 2,348,000.00

J1002 Kunci Pintu Masuk Utama/bh Logo


Bahan
Kunci Pintu bh 1.0000 1,500,000.00 1,500,000.00
Jumlah.a 1,500,000.00
Upah Pasang
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 98,000.00
Jumlah.a+b 1,598,000.00

J1003 Kunci Pintu Masuk Utama/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Pasang
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 98,000.00
Jumlah.a+b 848,000.00

J1004 Kunci Pintu Masuk Lain/bh Cisa


Bahan
Kunci Pintu bh 1.0000 1,125,000.00 1,125,000.00
Jumlah.a 1,125,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 1,216,000.00

J1005 Kunci Pintu Masuk Lain/bh Logo


Bahan
Kunci Pintu bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00

528975646.xls
Page 323 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 841,000.00

J1006 Kunci Pintu Masuk Lain/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 616,000.00

J1007 Kunci Pintu Masuk Kamar Utama/bh Cisa


Bahan
Kunci Pintu bh 1.0000 1,125,000.00 1,125,000.00
Jumlah.a 1,125,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 1,216,000.00

J1008 Kunci Pintu Masuk Kamar Utama/bh Logo


Bahan
Kunci Pintu bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 841,000.00

J1009 Kunci Pintu Masuk Kamar Utama/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 616,000.00

J1010 Kunci Pintu Masuk Kamar Lain/bh Cisa


Bahan
Kunci Pintu bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 841,000.00

J1011 Kunci Pintu Masuk Kamar Lain/bh Logo


Bahan
Kunci Pintu bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 616,000.00

528975646.xls
Page 324 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

J1012 Kunci Pintu Masuk Kamar Lain/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 466,000.00

J1013 Kunci Pintu Masuk K.Mandi Utama/bh Cisa


Bahan
Kunci Pintu bh 1.0000 1,125,000.00 1,125,000.00
Jumlah.a 1,125,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 84,000.00
Jumlah.a+b 1,209,000.00

J1014 Kunci Pintu Masuk K.Mandi Utama/bh Logo


Bahan
Kunci Pintu bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 84,000.00
Jumlah.a+b 834,000.00

J1015 Kunci Pintu Masuk K.Mandi Utama/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 84,000.00
Jumlah.a+b 609,000.00

J1016 Kunci Pintu Masuk K.Mandi Lain/bh Cisa


Bahan
Kunci Pintu bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 84,000.00
Jumlah.a+b 834,000.00

J1017 Kunci Pintu Masuk K.Mandi Lain/bh Logo


Bahan
Kunci Pintu bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 84,000.00
Jumlah.a+b 609,000.00

J1018 Kunci Pintu Masuk K.Mandi Lain/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00

528975646.xls
Page 325 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah Pasang
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 84,000.00
Jumlah.a+b 459,000.00

J1019 Kunci Pintu Masuk Kamar Service/bh Cisa


Bahan
Kunci Pintu bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 84,000.00
Jumlah.a+b 609,000.00

J1020 Kunci Pintu Masuk Kamar Service/bh Logo


Bahan
Kunci Pintu bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 84,000.00
Jumlah.a+b 459,000.00

J1021 Kunci Pintu Masuk Kamar Service/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6000 90,000.00 54,000.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 84,000.00
Jumlah.a+b 309,000.00

J1022 Kunci Pintu Masuk K.Mandi Service/bh Cisa


Bahan
Kunci Pintu bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Pasang
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 77,000.00
Jumlah.a+b 452,000.00

J1023 Kunci Pintu Masuk K.Mandi Service/bh Logo


Bahan
Kunci Pintu bh 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Pasang
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 77,000.00
Jumlah.a+b 302,000.00

J1024 Kunci Pintu Masuk K.Mandi Service/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 150,000.00 150,000.00
Jumlah.a 150,000.00
Upah Pasang
Tk.Kayu Halus ht 0.5500 90,000.00 49,500.00
Kep.Tukang ht 0.1833 108,000.00 19,800.00
Mandor ht 0.0611 126,000.00 7,700.00
Jumlah.b 77,000.00
Jumlah.a+b 227,000.00

528975646.xls
Page 326 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

J1025 Kunci Pintu Sliding/bh Cisa


Bahan
Kunci Pintu bh 1.0000 1,125,000.00 1,125,000.00
Jumlah.a 1,125,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 1,216,000.00

J1026 Kunci Pintu Sliding/bh Logo


Bahan
Kunci Pintu bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 841,000.00

J1027 Kunci Pintu Sliding/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 616,000.00

J1028 Kunci Pintu Lipat Umum/bh Cisa


Bahan
Kunci Pintu bh 1.0000 900,000.00 900,000.00
Jumlah.a 900,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 991,000.00

J1029 Kunci Pintu Lipat Umum/bh Logo


Bahan
Kunci Pintu bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 841,000.00

J1030 Kunci Pintu Lipat Umum/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Pasang
Tk.Kayu Halus ht 0.6500 90,000.00 58,500.00
Kep.Tukang ht 0.2167 108,000.00 23,400.00
Mandor ht 0.0722 126,000.00 9,100.00
Jumlah.b 91,000.00
Jumlah.a+b 466,000.00

528975646.xls
Page 327 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

J1031 Kunci Pintu Lipat Garasi/bh Cisa


Bahan
Kunci Pintu bh 1.0000 1,125,000.00 1,125,000.00
Jumlah.a 1,125,000.00
Upah Pasang
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 98,000.00
Jumlah.a+b 1,223,000.00

J1032 Kunci Pintu Lipat Garasi/bh Logo


Bahan
Kunci Pintu bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah Pasang
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 98,000.00
Jumlah.a+b 848,000.00

J1033 Kunci Pintu Lipat Garasi/bh Lainnya


Bahan
Kunci Pintu bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah Pasang
Tk.Kayu Halus ht 0.7000 90,000.00 63,000.00
Kep.Tukang ht 0.2333 108,000.00 25,200.00
Mandor ht 0.0778 126,000.00 9,800.00
Jumlah.b 98,000.00
Jumlah.a+b 623,000.00

J1034 Kunci Jendela Swing/bh


Bahan
Kunci Pintu bh 1.0000 150,000.00 150,000.00
Jumlah.a 150,000.00
Upah Pasang
Tk.Kayu Halus ht 0.2000 90,000.00 18,000.00
Kep.Tukang ht 0.0667 108,000.00 7,200.00
Mandor ht 0.0222 126,000.00 2,800.00
Jumlah.b 28,000.00
Jumlah.a+b 178,000.00

J1035 Kunci Jendela Sorong/bh


Bahan
Kunci Pintu bh 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah Pasang
Tk.Kayu Halus ht 0.2000 90,000.00 18,000.00
Kep.Tukang ht 0.0667 108,000.00 7,200.00
Mandor ht 0.0222 126,000.00 2,800.00
Jumlah.b 28,000.00
Jumlah.a+b 253,000.00

J1036 Kunci Jendela Lipat/bh


Bahan
Kunci Pintu bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah Pasang
Tk.Kayu Halus ht 0.2000 90,000.00 18,000.00
Kep.Tukang ht 0.0667 108,000.00 7,200.00
Mandor ht 0.0222 126,000.00 2,800.00
Jumlah.b 28,000.00
Jumlah.a+b 403,000.00

528975646.xls
Page 328 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.PENGECATAN

Lantai1
K1001 Meni Besi/m2
Bahan
Meni kg 0.1500 22,500.00 3,375.00
Jumlah.a 3,375.00
Upah
Kenek ht 0.0500 90,000.00 4,500.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 7,000.00
Alat
Amplas Besi lbr 0.5000 2,250.00 1,125.00
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Jumlah.c 2,250.00
Jumlah.a+b+c 12,625.00

K1002 Meni Kayu/m2


Bahan
Meni Kayu kg 0.2000 22,500.00 4,500.00
Jumlah.a 4,500.00
Upah
Kenek ht 0.0500 90,000.00 4,500.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 7,000.00
Alat
Amplas Kayu lbr 0.5000 2,250.00 1,125.00
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Jumlah.c 2,250.00
Jumlah.a+b+c 13,750.00

K1003 Meni Kayu L.15cm/m'


Bahan
Meni Kayu kg 0.0300 22,500.00 675.00
Jumlah.a 675.00
Upah
Kenek ht 0.0112 90,000.00 1,008.00
Kep.Tukang ht 0.0037 108,000.00 403.20
Mandor ht 0.0012 126,000.00 156.80
Jumlah.b 1,568.00

528975646.xls
Page 329 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Amplas Kayu lbr 0.0750 2,250.00 168.75
Kwas Cat 3" bh 0.0150 11,250.00 168.75
Jumlah.c 337.50
Jumlah.a+b+c 2,580.50

K1004 Residu Kayu/m2


Bahan
Residu Kayu kg 0.1000 5,250.00 525.00
Jumlah.a 525.00
Upah
Kenek ht 0.0500 90,000.00 4,500.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 7,000.00
Alat
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Jumlah.c 1,125.00
Jumlah.a+b+c 8,650.00

K1005 Cat Besi/m2


Bahan
Plamur Besi kg 0.1000 15,000.00 1,500.00
Cat Dasar kg 0.1000 22,500.00 2,250.00
Cat Besi kg 0.2000 37,500.00 7,500.00
Jumlah.a 11,250.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tukang Cat ht 0.2500 72,000.00 18,000.00
Kep.Tukang ht 0.0833 108,000.00 9,000.00
Mandor ht 0.0278 126,000.00 3,500.00
Jumlah.b 75,500.00

528975646.xls
Page 330 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Amplas Besi lbr 1.0000 2,250.00 2,250.00
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Jumlah.c 3,375.00
Jumlah.a+b+c 90,125.00

K1006 Cat Kayu Emulsion/m2


Bahan
Plamur Kayu kg 0.2000 15,000.00 3,000.00
Cat Dasar kg 0.1500 37,500.00 5,625.00
Cat Kayu kg 0.2500 37,500.00 9,375.00
Jumlah.a 15,000.00
Upah
Kenek ht 0.6250 90,000.00 56,250.00
Tukang Cat ht 0.3125 72,000.00 22,500.00
Kep.Tukang ht 0.1042 108,000.00 11,250.00
Mandor ht 0.0347 126,000.00 4,375.00
Jumlah.b 94,375.00
Alat
Amplas Kayu lbr 1.5000 2,250.00 3,375.00
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Jumlah.c 4,500.00
Jumlah.a+b+c 113,875.00

K1007 Cat Kayu Listplank L.20cm/m'


Bahan
Plamur Kayu kg 0.0600 15,000.00 900.00
Cat Dasar kg 0.0450 37,500.00 1,687.50
Cat Kayu kg 0.0750 37,500.00 2,812.50
Jumlah.a 4,500.00
Upah
Kenek ht 0.1875 90,000.00 16,875.00
Tukang Cat ht 0.0938 72,000.00 6,750.00
Kep.Tukang ht 0.0313 108,000.00 3,375.00
Mandor ht 0.0104 126,000.00 1,312.50
Jumlah.b 28,312.50
Alat
Amplas Kayu lbr 0.4500 2,250.00 1,012.50
Kwas Cat 3" bh 0.0300 11,250.00 337.50
Jumlah.c 1,350.00
Jumlah.a+b+c 34,162.50

K1008 Cat Kayu Listplank L.30cm/m'


Bahan
Plamur Kayu kg 0.0800 15,000.00 1,200.00
Cat Dasar kg 0.0600 37,500.00 2,250.00
Cat Kayu kg 0.1000 37,500.00 3,750.00
Jumlah.a 6,000.00
Upah
Kenek ht 0.3750 90,000.00 33,750.00
Tukang Cat ht 0.1875 72,000.00 13,500.00
Kep.Tukang ht 0.0625 108,000.00 6,750.00
Mandor ht 0.0208 126,000.00 2,625.00
Jumlah.b 56,625.00
Alat
Amplas Kayu lbr 0.6000 2,250.00 1,350.00
Kwas Cat 3" bh 0.0400 11,250.00 450.00
Jumlah.c 1,800.00
Jumlah.a+b+c 64,425.00

K1009 Cat Kayu Listplank L.40cm/m'


Bahan
Plamur Kayu kg 0.1000 15,000.00 1,500.00
Cat Dasar kg 0.0750 37,500.00 2,812.50
Cat Kayu kg 0.1250 37,500.00 4,687.50
Jumlah.a 7,500.00
Upah
Kenek ht 0.4687 90,000.00 42,183.00
Tukang Cat ht 0.2344 72,000.00 16,873.20
Kep.Tukang ht 0.0781 108,000.00 8,436.60
Mandor ht 0.0260 126,000.00 3,280.90
Jumlah.b 70,773.70

528975646.xls
Page 331 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Amplas Kayu lbr 0.7500 2,250.00 1,687.50
Kwas Cat 3" bh 0.0500 11,250.00 562.50
Jumlah.c 2,250.00
Jumlah.a+b+c 80,523.70

K1010 Cat Kayu List Plafond Sudut 3x3cm/m'


Bahan
Plamur Kayu kg 0.0150 15,000.00 225.00
Cat Dasar kg 0.0113 37,500.00 423.75
Cat Kayu kg 0.0188 37,500.00 705.00
Jumlah.a 1,128.75
Upah
Kenek ht 0.0469 90,000.00 4,221.00
Tukang Cat ht 0.0235 72,000.00 1,688.40
Kep.Tukang ht 0.0078 108,000.00 844.20
Mandor ht 0.0026 126,000.00 328.30
Jumlah.b 7,081.90
Alat
Amplas Kayu lbr 0.1125 2,250.00 253.13
Kwas Cat 3" bh 0.0075 11,250.00 84.38
Jumlah.c 337.50
Jumlah.a+b+c 8,548.15

K1011 Cat Kayu List Plafond Sudut 5x5cm/m'


Bahan
Plamur Kayu kg 0.0300 15,000.00 450.00
Cat Dasar kg 0.0226 37,500.00 847.50
Cat Kayu kg 0.0376 37,500.00 1,410.00
Jumlah.a 2,257.50
Upah
Kenek ht 0.0938 90,000.00 8,442.00
Tukang Cat ht 0.0469 72,000.00 3,376.80
Kep.Tukang ht 0.0156 108,000.00 1,688.40
Mandor ht 0.0052 126,000.00 656.60
Jumlah.b 14,163.80
Alat
Amplas Kayu lbr 0.2250 2,250.00 506.25
Kwas Cat 3" bh 0.0150 11,250.00 168.75
Jumlah.c 675.00
Jumlah.a+b+c 17,096.30

K1012 Cat Kayu List Plafond Sudut 7,5x7,5cm/m'


Bahan
Plamur Kayu kg 0.0400 15,000.00 600.00
Cat Dasar kg 0.0301 37,500.00 1,128.75
Cat Kayu kg 0.0501 37,500.00 1,878.75
Jumlah.a 3,007.50
Upah
Kenek ht 0.1250 90,000.00 11,250.00
Tukang Cat ht 0.0625 72,000.00 4,500.00
Kep.Tukang ht 0.0208 108,000.00 2,250.00
Mandor ht 0.0069 126,000.00 875.00
Jumlah.b 18,875.00
Alat
Amplas Kayu lbr 0.3000 2,250.00 675.00
Kwas Cat 3" bh 0.0200 11,250.00 225.00
Jumlah.c 900.00
Jumlah.a+b+c 22,782.50

K1013 Cat Kayu List Plafond Sudut 10x10cm/m'


Bahan
Plamur Kayu kg 0.0500 15,000.00 750.00
Cat Dasar kg 0.0376 37,500.00 1,410.00
Cat Kayu kg 0.0626 37,500.00 2,347.50
Jumlah.a 3,757.50
Upah
Kenek ht 0.1563 90,000.00 14,067.00
Tukang Cat ht 0.0782 72,000.00 5,626.80
Kep.Tukang ht 0.0261 108,000.00 2,813.40
Mandor ht 0.0087 126,000.00 1,094.10
Jumlah.b 23,601.30

528975646.xls
Page 332 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Amplas Kayu lbr 0.3750 2,250.00 843.75
Kwas Cat 3" bh 0.0250 11,250.00 281.25
Jumlah.c 1,125.00
Jumlah.a+b+c 28,483.80

K1014 Cat Kayu List Plafond Sudut 12,5x12,5cm/m'


Bahan
Plamur Kayu kg 0.0600 15,000.00 900.00
Cat Dasar kg 0.0452 37,500.00 1,695.00
Cat Kayu kg 0.0752 37,500.00 2,820.00
Jumlah.a 4,515.00
Upah
Kenek ht 0.1876 90,000.00 16,884.00
Tukang Cat ht 0.0938 72,000.00 6,753.60
Kep.Tukang ht 0.0313 108,000.00 3,376.80
Mandor ht 0.0104 126,000.00 1,313.20
Jumlah.b 28,327.60
Alat
Amplas Kayu lbr 0.4500 2,250.00 1,012.50
Kwas Cat 3" bh 0.0300 11,250.00 337.50
Jumlah.c 1,350.00
Jumlah.a+b+c 34,192.60

K1015 Cat Kayu Kosen 5x15cm 3 Sisi U/m'


Bahan
Plamur Kayu kg 0.0500 15,000.00 750.00
Cat Dasar kg 0.0375 37,500.00 1,406.25
Cat Kayu kg 0.0625 37,500.00 2,343.75
Jumlah.a 3,750.00
Upah
Kenek ht 0.1563 90,000.00 14,067.00
Tukang Cat ht 0.0782 72,000.00 5,626.80
Kep.Tukang ht 0.0261 108,000.00 2,813.40
Mandor ht 0.0087 126,000.00 1,094.10
Jumlah.b 23,601.30
Alat
Amplas Kayu lbr 0.3750 2,250.00 843.75
Kwas Cat 3" bh 0.0250 11,250.00 281.25
Jumlah.c 1,125.00
Jumlah.a+b+c 28,476.30

K1016 Cat Kayu Kosen 5x15cm 4 Sisi O/m'


Bahan
Plamur Kayu kg 0.0800 15,000.00 1,200.00
Cat Dasar kg 0.0600 37,500.00 2,250.00
Cat Kayu kg 0.1000 37,500.00 3,750.00
Jumlah.a 6,000.00
Upah
Kenek ht 0.2500 90,000.00 22,500.00
Tukang Cat ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0417 108,000.00 4,500.00
Mandor ht 0.0139 126,000.00 1,750.00
Jumlah.b 37,750.00
Alat
Amplas Kayu lbr 0.6000 2,250.00 1,350.00
Kwas Cat 3" bh 0.0400 11,250.00 450.00
Jumlah.c 1,800.00
Jumlah.a+b+c 45,550.00

K1017 Cat Kayu Duco/m2


Bahan
Plamur Duco kg 0.5000 22,500.00 11,250.00
Cat Duco kg 0.2500 52,500.00 13,125.00
Jumlah.a 13,125.00
Upah
Kenek ht 1.5000 90,000.00 135,000.00
Tukang Cat ht 0.7500 72,000.00 54,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 226,500.00

528975646.xls
Page 333 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Amplas Duco lbr 2.0000 3,000.00 6,000.00
Kwas Cat 3" bh 0.0500 11,250.00 562.50
Compressor+Sprayer hk 0.1000 200,000.00 20,000.00
Jumlah.c 26,562.50
Jumlah.a+b+c 266,187.50

K1018 Cat Lisplank Kayu Duco T.20cm/m'


Bahan
Plamur Duco kg 0.1500 22,500.00 3,375.00
Cat Duco kg 0.0750 52,500.00 3,937.50
Jumlah.a 3,937.50
Upah
Kenek ht 0.9000 90,000.00 81,000.00
Tukang Cat ht 0.4500 72,000.00 32,400.00
Kep.Tukang ht 0.1500 108,000.00 16,200.00
Mandor ht 0.0500 126,000.00 6,300.00
Jumlah.b 135,900.00
Alat
Amplas Duco lbr 0.0600 3,000.00 180.00
Kwas Cat 3" bh 0.0150 11,250.00 168.75
Compressor+Sprayer hk 0.0600 200,000.00 12,000.00
Jumlah.c 12,348.75
Jumlah.a+b+c 152,186.25

K1019 Cat Lisplank Kayu Duco T.30cm/m'


Bahan
Plamur Duco kg 0.2000 22,500.00 4,500.00
Cat Duco kg 0.1000 52,500.00 5,250.00
Jumlah.a 5,250.00
Upah
Kenek ht 1.2000 90,000.00 108,000.00
Tukang Cat ht 0.6000 72,000.00 43,200.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 181,200.00
Alat
Amplas Duco lbr 0.0800 3,000.00 240.00
Kwas Cat 3" bh 0.0200 11,250.00 225.00
Compressor+Sprayer hk 0.0800 200,000.00 16,000.00
Jumlah.c 16,465.00
Jumlah.a+b+c 202,915.00

K1020 Cat Lisplank Kayu Duco T.40cm/m'


Bahan
Plamur Duco kg 0.2500 22,500.00 5,625.00
Cat Duco kg 0.1250 52,500.00 6,562.50
Jumlah.a 6,562.50
Upah
Kenek ht 1.5000 90,000.00 135,000.00
Tukang Cat ht 0.7500 72,000.00 54,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 226,500.00
Alat
Amplas Duco lbr 0.1000 3,000.00 300.00
Kwas Cat 3" bh 0.0250 11,250.00 281.25
Compressor+Sprayer hk 0.1000 200,000.00 20,000.00
Jumlah.c 20,581.25
Jumlah.a+b+c 253,643.75

K1021 Cat Duco List Plafond Sudut 3x3cm/m'


Bahan
Plamur Duco kg 0.0375 22,500.00 843.75
Cat Duco kg 0.0188 52,500.00 987.00
Jumlah.a 987.00
Upah
Kenek ht 0.2250 90,000.00 20,250.00
Tukang Cat ht 0.1125 72,000.00 8,100.00
Kep.Tukang ht 0.0375 108,000.00 4,050.00
Mandor ht 0.0125 126,000.00 1,575.00
Jumlah.b 33,975.00

528975646.xls
Page 334 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Amplas Duco lbr 0.0150 3,000.00 45.00
Kwas Cat 3" bh 0.0038 11,250.00 42.75
Compressor+Sprayer hk 0.0150 200,000.00 3,000.00
Jumlah.c 3,087.75
Jumlah.a+b+c 38,049.75

K1022 Cat Duco List Plafond Sudut 5x5cm/m'


Bahan
Plamur Duco kg 0.0750 22,500.00 1,687.50
Cat Duco kg 0.0376 52,500.00 1,974.00
Jumlah.a 1,974.00
Upah
Kenek ht 0.4500 90,000.00 40,500.00
Tukang Cat ht 0.2250 72,000.00 16,200.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 67,950.00
Alat
Amplas Duco lbr 0.0300 3,000.00 90.00
Kwas Cat 3" bh 0.0076 11,250.00 85.50
Compressor+Sprayer hk 0.0300 200,000.00 6,000.00
Jumlah.c 6,175.50
Jumlah.a+b+c 76,099.50

K1023 Cat Duco List Plafond Sudut 7,5x7,5cm/m'


Bahan
Plamur Duco kg 0.1000 22,500.00 2,250.00
Cat Duco kg 0.0501 52,500.00 2,630.25
Jumlah.a 2,630.25
Upah
Kenek ht 0.6000 90,000.00 54,000.00
Tukang Cat ht 0.3000 72,000.00 21,600.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 90,600.00
Alat
Amplas Duco lbr 0.0400 3,000.00 120.00
Kwas Cat 3" bh 0.0101 11,250.00 113.63
Compressor+Sprayer hk 0.0400 200,000.00 8,000.00
Jumlah.c 8,233.63
Jumlah.a+b+c 101,463.88

K1024 Cat Duco List Plafond Sudut 10x10cm/m'


Bahan
Plamur Duco kg 0.1250 22,500.00 2,812.50
Cat Duco kg 0.0626 52,500.00 3,286.50
Jumlah.a 3,286.50
Upah
Kenek ht 0.7500 90,000.00 67,500.00
Tukang Cat ht 0.3750 72,000.00 27,000.00
Kep.Tukang ht 0.1250 108,000.00 13,500.00
Mandor ht 0.0417 126,000.00 5,250.00
Jumlah.b 113,250.00
Alat
Amplas Duco lbr 0.0500 3,000.00 150.00
Kwas Cat 3" bh 0.0126 11,250.00 141.75
Compressor+Sprayer hk 0.0500 200,000.00 10,000.00
Jumlah.c 10,291.75
Jumlah.a+b+c 126,828.25

K1025 Cat Duco List Plafond Sudut 12,5x12,5cm/m'


Bahan
Plamur Duco kg 0.1500 22,500.00 3,375.00
Cat Duco kg 0.0751 52,500.00 3,942.75
Jumlah.a 3,942.75
Upah
Kenek ht 0.9000 90,000.00 81,000.00
Tukang Cat ht 0.4500 72,000.00 32,400.00
Kep.Tukang ht 0.1500 108,000.00 16,200.00
Mandor ht 0.0500 126,000.00 6,300.00
Jumlah.b 135,900.00

528975646.xls
Page 335 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Amplas Duco lbr 0.0600 3,000.00 180.00
Kwas Cat 3" bh 0.0151 11,250.00 169.88
Compressor+Sprayer hk 0.0600 200,000.00 12,000.00
Jumlah.c 12,349.88
Jumlah.a+b+c 152,192.63

K1026 Cat Kosen Kayu Duco 5x15cm 3 Sisi U/m'


Bahan
Plamur Duco kg 0.1250 22,500.00 2,812.50
Cat Duco kg 0.0625 52,500.00 3,281.25
Jumlah.a 3,281.25
Upah
Kenek ht 0.7500 90,000.00 67,500.00
Tukang Cat ht 0.3750 72,000.00 27,000.00
Kep.Tukang ht 0.1250 108,000.00 13,500.00
Mandor ht 0.0417 126,000.00 5,250.00
Jumlah.b 113,250.00
Alat
Amplas Duco lbr 0.0500 3,000.00 150.00
Kwas Cat 3" bh 0.0125 11,250.00 140.63
Compressor+Sprayer hk 0.0500 200,000.00 10,000.00
Jumlah.c 10,290.63
Jumlah.a+b+c 126,821.88

K1027 Cat Kosen Kayu Duco 5x15cm 4 Sisi O/m'


Bahan
Plamur Duco kg 0.2000 22,500.00 4,500.00
Cat Duco kg 0.1000 52,500.00 5,250.00
Jumlah.a 5,250.00
Upah
Kenek ht 1.2000 90,000.00 108,000.00
Tukang Cat ht 0.6000 72,000.00 43,200.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 181,200.00
Alat
Amplas Duco lbr 0.0800 3,000.00 240.00
Kwas Cat 3" bh 0.0200 11,250.00 225.00
Compressor+Sprayer hk 0.0800 200,000.00 16,000.00
Jumlah.c 16,465.00
Jumlah.a+b+c 202,915.00

K1028 Politur Ultran P.01/m2


Bahan
Impra kg 0.2500 15,000.00 3,750.00
Politur Ultran kg 0.2000 45,000.00 9,000.00
Jumlah.a 9,000.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tukang Cat ht 0.5000 72,000.00 36,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 151,000.00
Alat
Amplas Kayu lbr 2.0000 2,250.00 4,500.00
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Jumlah.c 5,625.00
Jumlah.a+b+c 165,625.00

K1029 Politur Ultran P.01 Listplank T.20cm/m'


Bahan
Impra kg 0.0750 15,000.00 1,125.00
Politur Ultran kg 0.0600 45,000.00 2,700.00
Jumlah.a 2,700.00
Upah
Kenek ht 0.6000 90,000.00 54,000.00
Tukang Cat ht 0.3000 72,000.00 21,600.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 90,600.00

528975646.xls
Page 336 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Amplas Kayu lbr 0.6000 2,250.00 1,350.00
Kwas Cat 3" bh 0.0300 11,250.00 337.50
Jumlah.c 1,687.50
Jumlah.a+b+c 94,987.50

K1030 Politur Ultran P.01 Listplank T.30cm/m'


Bahan
Impra kg 0.1000 15,000.00 1,500.00
Politur Ultran kg 0.0800 45,000.00 3,600.00
Jumlah.a 3,600.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tukang Cat ht 0.4000 72,000.00 28,800.00
Kep.Tukang ht 0.1333 108,000.00 14,400.00
Mandor ht 0.0444 126,000.00 5,600.00
Jumlah.b 120,800.00
Alat
Amplas Kayu lbr 0.8000 2,250.00 1,800.00
Kwas Cat 3" bh 0.0400 11,250.00 450.00
Jumlah.c 2,250.00
Jumlah.a+b+c 126,650.00

K1031 Politur Ultran P.01 Listplank T.40cm/m'


Bahan
Impra kg 0.1250 15,000.00 1,875.00
Politur Ultran kg 0.1000 45,000.00 4,500.00
Jumlah.a 4,500.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tukang Cat ht 0.5000 72,000.00 36,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 151,000.00
Alat
Amplas Kayu lbr 1.0000 2,250.00 2,250.00
Kwas Cat 3" bh 0.0500 11,250.00 562.50
Jumlah.c 2,812.50
Jumlah.a+b+c 158,312.50

K1032 Politur Ultran P.01 List Plafond Sudut 3x3cm/m'


Bahan
Impra kg 0.0188 15,000.00 282.00
Politur Ultran kg 0.0150 45,000.00 675.00
Jumlah.a 675.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tukang Cat ht 0.0750 72,000.00 5,400.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 22,650.00
Alat
Amplas Kayu lbr 0.1500 2,250.00 337.50
Kwas Cat 3" bh 0.0075 11,250.00 84.38
Jumlah.c 421.88
Jumlah.a+b+c 23,746.88

K1033 Politur Ultran P.01 List Plafond Sudut 5x5cm/m'


Bahan
Impra kg 0.0376 15,000.00 564.00
Politur Ultran kg 0.0300 45,000.00 1,350.00
Jumlah.a 1,350.00
Upah
Kenek ht 0.3000 90,000.00 27,000.00
Tukang Cat ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0500 108,000.00 5,400.00
Mandor ht 0.0167 126,000.00 2,100.00
Jumlah.b 45,300.00
Alat
Amplas Kayu lbr 0.3000 2,250.00 675.00
Kwas Cat 3" bh 0.0150 11,250.00 168.75
Jumlah.c 843.75
Jumlah.a+b+c 47,493.75

528975646.xls
Page 337 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

K1034 Politur Ultran P.01 List Plafond Sudut 7,5x7,5cm/m'


Bahan
Impra kg 0.0501 15,000.00 751.50
Politur Ultran kg 0.0400 45,000.00 1,800.00
Jumlah.a 1,800.00
Upah
Kenek ht 0.4000 90,000.00 36,000.00
Tukang Cat ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.0667 108,000.00 7,200.00
Mandor ht 0.0222 126,000.00 2,800.00
Jumlah.b 60,400.00
Alat
Amplas Kayu lbr 0.4000 2,250.00 900.00
Kwas Cat 3" bh 0.0200 11,250.00 225.00
Jumlah.c 1,125.00
Jumlah.a+b+c 63,325.00

K1035 Politur Ultran P.01 List Plafond Sudut 10x10cm/m'


Bahan
Impra kg 0.0626 15,000.00 939.00
Politur Ultran kg 0.0500 45,000.00 2,250.00
Jumlah.a 2,250.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tukang Cat ht 0.2500 72,000.00 18,000.00
Kep.Tukang ht 0.0833 108,000.00 9,000.00
Mandor ht 0.0278 126,000.00 3,500.00
Jumlah.b 75,500.00
Alat
Amplas Kayu lbr 0.5000 2,250.00 1,125.00
Kwas Cat 3" bh 0.0250 11,250.00 281.25
Jumlah.c 1,406.25
Jumlah.a+b+c 79,156.25

K1036 Politur Ultran P.01 List Plafond Sudut 12,5x12,5cm/m'


Bahan
Impra kg 0.0751 15,000.00 1,126.50
Politur Ultran kg 0.0600 45,000.00 2,700.00
Jumlah.a 2,700.00
Upah
Kenek ht 0.6000 90,000.00 54,000.00
Tukang Cat ht 0.3000 72,000.00 21,600.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 90,600.00
Alat
Amplas Kayu lbr 0.6000 2,250.00 1,350.00
Kwas Cat 3" bh 0.0300 11,250.00 337.50
Jumlah.c 1,687.50
Jumlah.a+b+c 94,987.50

K1037 Politur Ultran P.01 Kosen 5x15cm 3 Sisi U/m'


Bahan
Impra kg 0.0625 15,000.00 937.50
Politur Ultran kg 0.0500 45,000.00 2,250.00
Jumlah.a 2,250.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tukang Cat ht 0.2500 72,000.00 18,000.00
Kep.Tukang ht 0.0833 108,000.00 9,000.00
Mandor ht 0.0278 126,000.00 3,500.00
Jumlah.b 75,500.00
Alat
Amplas Kayu lbr 0.5000 2,250.00 1,125.00
Kwas Cat 3" bh 0.0250 11,250.00 281.25
Jumlah.c 1,406.25
Jumlah.a+b+c 79,156.25

528975646.xls
Page 338 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

K1038 Politur Ultran P.01 Kosen 5x15cm 4 Sisi U/m'


Bahan
Impra kg 0.1000 15,000.00 1,500.00
Politur Ultran kg 0.0800 45,000.00 3,600.00
Jumlah.a 3,600.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tukang Cat ht 0.4000 72,000.00 28,800.00
Kep.Tukang ht 0.1333 108,000.00 14,400.00
Mandor ht 0.0444 126,000.00 5,600.00
Jumlah.b 120,800.00
Alat
Amplas Kayu lbr 0.8000 2,250.00 1,800.00
Kwas Cat 3" bh 0.0400 11,250.00 450.00
Jumlah.c 2,250.00
Jumlah.a+b+c 126,650.00

K1039 Politur Ultran P.03/m2


Bahan
Impra kg 0.2500 15,000.00 3,750.00
Politur Ultran kg 0.2500 45,000.00 11,250.00
Jumlah.a 11,250.00
Upah
Kenek ht 1.2000 90,000.00 108,000.00
Tukang Cat ht 0.6000 72,000.00 43,200.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 181,200.00
Alat
Amplas Kayu lbr 2.0000 2,250.00 4,500.00
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Jumlah.c 5,625.00
Jumlah.a+b+c 198,075.00

K1040 Politur Ultran P.03 Listplank T.20cm/m'


Bahan
Impra kg 0.0750 15,000.00 1,125.00
Politur Ultran kg 0.0600 45,000.00 2,700.00
Jumlah.a 2,700.00
Upah
Kenek ht 0.6000 90,000.00 54,000.00
Tukang Cat ht 0.3000 72,000.00 21,600.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 90,600.00
Alat
Amplas Kayu lbr 0.6000 2,250.00 1,350.00
Kwas Cat 3" bh 0.0300 11,250.00 337.50
Jumlah.c 1,687.50
Jumlah.a+b+c 94,987.50

K1041 Politur Ultran P.03 Listplank T.30cm/m'


Bahan
Impra kg 0.1000 15,000.00 1,500.00
Politur Ultran kg 0.0800 45,000.00 3,600.00
Jumlah.a 3,600.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tukang Cat ht 0.4000 72,000.00 28,800.00
Kep.Tukang ht 0.1333 108,000.00 14,400.00
Mandor ht 0.0444 126,000.00 5,600.00
Jumlah.b 120,800.00
Alat
Amplas Kayu lbr 0.8000 2,250.00 1,800.00
Kwas Cat 3" bh 0.0400 11,250.00 450.00
Jumlah.c 2,250.00
Jumlah.a+b+c 126,650.00

528975646.xls
Page 339 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

K1042 Politur Ultran P.03 Listplank T.40cm/m'


Bahan
Impra kg 0.1250 15,000.00 1,875.00
Politur Ultran kg 0.1000 45,000.00 4,500.00
Jumlah.a 4,500.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tukang Cat ht 0.5000 72,000.00 36,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 151,000.00
Alat
Amplas Kayu lbr 1.0000 2,250.00 2,250.00
Kwas Cat 3" bh 0.0500 11,250.00 562.50
Jumlah.c 2,812.50
Jumlah.a+b+c 158,312.50

K1043 Politur Ultran P.03 List Plafond Sudut 3x3cm/m'


Bahan
Impra kg 0.0188 15,000.00 282.00
Politur Ultran kg 0.0150 45,000.00 675.00
Jumlah.a 957.00
Upah
Kenek ht 0.1500 90,000.00 13,500.00
Tukang Cat ht 0.0750 72,000.00 5,400.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 22,650.00
Alat
Amplas Kayu lbr 0.1500 2,250.00 337.50
Kwas Cat 3" bh 0.0075 11,250.00 84.38
Jumlah.c 421.88
Jumlah.a+b+c 24,028.88

K1044 Politur Ultran P.03 List Plafond Sudut 5x5cm/m'


Bahan
Impra kg 0.0376 15,000.00 564.00
Politur Ultran kg 0.0300 45,000.00 1,350.00
Jumlah.a 1,914.00
Upah
Kenek ht 0.3000 90,000.00 27,000.00
Tukang Cat ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0500 108,000.00 5,400.00
Mandor ht 0.0167 126,000.00 2,100.00
Jumlah.b 45,300.00
Alat
Amplas Kayu lbr 0.3000 2,250.00 675.00
Kwas Cat 3" bh 0.0150 11,250.00 168.75
Jumlah.c 843.75
Jumlah.a+b+c 48,057.75

K1045 Politur Ultran P.03 List Plafond Sudut 7,5x7,5cm/m'


Bahan
Impra kg 0.0501 15,000.00 751.50
Politur Ultran kg 0.0400 45,000.00 1,800.00
Jumlah.a 2,551.50
Upah
Kenek ht 0.4000 90,000.00 36,000.00
Tukang Cat ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.0667 108,000.00 7,200.00
Mandor ht 0.0222 126,000.00 2,800.00
Jumlah.b 60,400.00
Alat
Amplas Kayu lbr 0.4000 2,250.00 900.00
Kwas Cat 3" bh 0.0200 11,250.00 225.00
Jumlah.c 1,125.00
Jumlah.a+b+c 64,076.50

528975646.xls
Page 340 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

K1046 Politur Ultran P.03 List Plafond Sudut 10x10cm/m'


Bahan
Impra kg 0.0626 15,000.00 939.00
Politur Ultran kg 0.0500 45,000.00 2,250.00
Jumlah.a 3,189.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tukang Cat ht 0.2500 72,000.00 18,000.00
Kep.Tukang ht 0.0833 108,000.00 9,000.00
Mandor ht 0.0278 126,000.00 3,500.00
Jumlah.b 75,500.00
Alat
Amplas Kayu lbr 0.5000 2,250.00 1,125.00
Kwas Cat 3" bh 0.0250 11,250.00 281.25
Jumlah.c 1,406.25
Jumlah.a+b+c 80,095.25

K1047 Politur Ultran P.03 List Plafond Sudut 12,5x12,5cm/m'


Bahan
Impra kg 0.0751 15,000.00 1,126.50
Politur Ultran kg 0.0600 45,000.00 2,700.00
Jumlah.a 3,826.50
Upah
Kenek ht 0.6000 90,000.00 54,000.00
Tukang Cat ht 0.3000 72,000.00 21,600.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 90,600.00
Alat
Amplas Kayu lbr 0.6000 2,250.00 1,350.00
Kwas Cat 3" bh 0.0300 11,250.00 337.50
Jumlah.c 1,687.50
Jumlah.a+b+c 96,114.00

K1048 Politur Ultran P.03 Kosen 5x15cm 3 Sisi U/m'


Bahan
Impra kg 0.0625 15,000.00 937.50
Politur Ultran kg 0.0500 45,000.00 2,250.00
Jumlah.a 3,187.50
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tukang Cat ht 0.2500 72,000.00 18,000.00
Kep.Tukang ht 0.0833 108,000.00 9,000.00
Mandor ht 0.0278 126,000.00 3,500.00
Jumlah.b 75,500.00
Alat
Amplas Kayu lbr 0.5000 2,250.00 1,125.00
Kwas Cat 3" bh 0.0250 11,250.00 281.25
Jumlah.c 1,406.25
Jumlah.a+b+c 80,093.75

K1049 Politur Ultran P.03 Kosen 5x15cm 4 Sisi U/m'


Bahan
Impra kg 0.1000 15,000.00 1,500.00
Politur Ultran kg 0.0800 45,000.00 3,600.00
Jumlah.a 5,100.00
Upah
Kenek ht 0.8000 90,000.00 72,000.00
Tukang Cat ht 0.4000 72,000.00 28,800.00
Kep.Tukang ht 0.1333 108,000.00 14,400.00
Mandor ht 0.0444 126,000.00 5,600.00
Jumlah.b 120,800.00
Alat
Amplas Kayu lbr 0.8000 2,250.00 1,800.00
Kwas Cat 3" bh 0.0400 11,250.00 450.00
Jumlah.c 2,250.00
Jumlah.a+b+c 128,150.00

528975646.xls
Page 341 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

K1050 Politur Melamic/m2


Bahan
Impra kg 0.2000 15,000.00 3,000.00
Politur Dasar kg 0.1000 52,500.00 5,250.00
Politur Melamic kg 0.2000 60,000.00 12,000.00
Jumlah.a 20,250.00
Upah
Kenek ht 1.5000 90,000.00 135,000.00
Tukang Cat ht 0.7500 72,000.00 54,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 226,500.00
Alat
Amplas Kayu lbr 2.0000 2,250.00 4,500.00
Kwas Cat 3" bh 0.1000 11,250.00 1,125.00
Compressor+Sprayer hk 0.1000 200,000.00 20,000.00
Jumlah.c 25,625.00
Jumlah.a+b+c 272,375.00

K1051 Politur Melamic Listplank T.20cm/m'


Bahan
Impra kg 0.0600 15,000.00 900.00
Politur Dasar kg 0.0300 52,500.00 1,575.00
Politur Melamic kg 0.0600 60,000.00 3,600.00
Jumlah.a 5,175.00
Upah
Kenek ht 0.9000 90,000.00 81,000.00
Tukang Cat ht 0.4500 72,000.00 32,400.00
Kep.Tukang ht 0.1500 108,000.00 16,200.00
Mandor ht 0.0500 126,000.00 6,300.00
Jumlah.b 135,900.00
Alat
Amplas Kayu lbr 0.6000 2,250.00 1,350.00
Kwas Cat 3" bh 0.0300 11,250.00 337.50
Compressor+Sprayer hk 0.0600 200,000.00 12,000.00
Jumlah.c 13,687.50
Jumlah.a+b+c 154,762.50

K1052 Politur Melamic Listplank T.30cm/m'


Bahan
Impra kg 0.0800 15,000.00 1,200.00
Politur Dasar kg 0.0400 52,500.00 2,100.00
Politur Melamic kg 0.0800 60,000.00 4,800.00
Jumlah.a 6,900.00
Upah
Kenek ht 1.2000 90,000.00 108,000.00
Tukang Cat ht 0.6000 72,000.00 43,200.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 181,200.00
Alat
Amplas Kayu lbr 0.8000 2,250.00 1,800.00
Kwas Cat 3" bh 0.0400 11,250.00 450.00
Compressor+Sprayer hk 0.0800 200,000.00 16,000.00
Jumlah.c 18,250.00
Jumlah.a+b+c 206,350.00

K1053 Politur Melamic Listplank T.40cm/m'


Bahan
Impra kg 0.1000 15,000.00 1,500.00
Politur Dasar kg 0.0500 52,500.00 2,625.00
Politur Melamic kg 0.1000 60,000.00 6,000.00
Jumlah.a 8,625.00
Upah
Kenek ht 1.5000 90,000.00 135,000.00
Tukang Cat ht 0.7500 72,000.00 54,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 226,500.00

528975646.xls
Page 342 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Amplas Kayu lbr 1.0000 2,250.00 2,250.00
Kwas Cat 3" bh 0.0500 11,250.00 562.50
Compressor+Sprayer hk 0.1000 200,000.00 20,000.00
Jumlah.c 22,812.50
Jumlah.a+b+c 257,937.50

K1054 Politur Melamic List Plafond Sudut 3x3cm/m'


Bahan
Impra kg 0.0300 15,000.00 450.00
Politur Dasar kg 0.0150 52,500.00 787.50
Politur Melamic kg 0.0300 60,000.00 1,800.00
Jumlah.a 2,587.50
Upah
Kenek ht 0.4500 90,000.00 40,500.00
Tukang Cat ht 0.2250 72,000.00 16,200.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 67,950.00
Alat
Amplas Kayu lbr 0.3000 2,250.00 675.00
Kwas Cat 3" bh 0.0150 11,250.00 168.75
Compressor+Sprayer hk 0.0300 200,000.00 6,000.00
Jumlah.c 6,843.75
Jumlah.a+b+c 77,381.25

K1055 Politur Melamic List Plafond Sudut 5x5cm/m'


Bahan
Impra kg 0.0600 15,000.00 900.00
Politur Dasar kg 0.0300 52,500.00 1,575.00
Politur Melamic kg 0.0600 60,000.00 3,600.00
Jumlah.a 5,175.00
Upah
Kenek ht 0.9000 90,000.00 81,000.00
Tukang Cat ht 0.4500 72,000.00 32,400.00
Kep.Tukang ht 0.1500 108,000.00 16,200.00
Mandor ht 0.0500 126,000.00 6,300.00
Jumlah.b 135,900.00
Alat
Amplas Kayu lbr 0.6000 2,250.00 1,350.00
Kwas Cat 3" bh 0.0300 11,250.00 337.50
Compressor+Sprayer hk 0.0600 200,000.00 12,000.00
Jumlah.c 13,687.50
Jumlah.a+b+c 154,762.50

K1056 Politur Melamic List Plafond Sudut 7,5x7,5cm/m'


Bahan
Impra kg 0.0800 15,000.00 1,200.00
Politur Dasar kg 0.0400 52,500.00 2,100.00
Politur Melamic kg 0.0800 60,000.00 4,800.00
Jumlah.a 6,900.00
Upah
Kenek ht 1.2000 90,000.00 108,000.00
Tukang Cat ht 0.6000 72,000.00 43,200.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 181,200.00
Alat
Amplas Kayu lbr 0.8000 2,250.00 1,800.00
Kwas Cat 3" bh 0.0400 11,250.00 450.00
Compressor+Sprayer hk 0.0800 200,000.00 16,000.00
Jumlah.c 18,250.00
Jumlah.a+b+c 206,350.00

K1057 Politur Melamic List Plafond Sudut 10x10cm/m'


Bahan
Impra kg 0.1000 15,000.00 1,500.00
Politur Dasar kg 0.0500 52,500.00 2,625.00
Politur Melamic kg 0.1000 60,000.00 6,000.00
Jumlah.a 8,625.00

528975646.xls
Page 343 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 1.5000 90,000.00 135,000.00
Tukang Cat ht 0.7500 72,000.00 54,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 226,500.00
Alat
Amplas Kayu lbr 1.0000 2,250.00 2,250.00
Kwas Cat 3" bh 0.0500 11,250.00 562.50
Compressor+Sprayer hk 0.1000 200,000.00 20,000.00
Jumlah.c 22,812.50
Jumlah.a+b+c 257,937.50

K1058 Politur Melamic List Plafond Sudut 12,5x12,5cm/m'


Bahan
Impra kg 0.1200 15,000.00 1,800.00
Politur Dasar kg 0.0600 52,500.00 3,150.00
Politur Melamic kg 0.1200 60,000.00 7,200.00
Jumlah.a 10,350.00
Upah
Kenek ht 1.8000 90,000.00 162,000.00
Tukang Cat ht 0.9000 72,000.00 64,800.00
Kep.Tukang ht 0.3000 108,000.00 32,400.00
Mandor ht 0.1000 126,000.00 12,600.00
Jumlah.b 271,800.00
Alat
Amplas Kayu lbr 1.2000 2,250.00 2,700.00
Kwas Cat 3" bh 0.0600 11,250.00 675.00
Compressor+Sprayer hk 0.1200 200,000.00 24,000.00
Jumlah.c 27,375.00
Jumlah.a+b+c 309,525.00

K1059 Politur Melamic Kosen 5x15cm 3 Sisi U/m'


Bahan
Impra kg 0.0500 15,000.00 750.00
Politur Dasar kg 0.0250 52,500.00 1,312.50
Politur Melamic kg 0.0500 60,000.00 3,000.00
Jumlah.a 4,312.50
Upah
Kenek ht 0.7500 90,000.00 67,500.00
Tukang Cat ht 0.3750 72,000.00 27,000.00
Kep.Tukang ht 0.1250 108,000.00 13,500.00
Mandor ht 0.0417 126,000.00 5,250.00
Jumlah.b 113,250.00
Alat
Amplas Kayu lbr 0.5000 2,250.00 1,125.00
Kwas Cat 3" bh 0.0250 11,250.00 281.25
Compressor+Sprayer hk 0.0500 200,000.00 10,000.00
Jumlah.c 11,406.25
Jumlah.a+b+c 128,968.75

K1060 Politur Melamic Kosen 5x15cm 4 Sisi O/m'


Bahan
Impra kg 0.0800 15,000.00 1,200.00
Politur Dasar kg 0.0400 52,500.00 2,100.00
Politur Melamic kg 0.0800 60,000.00 4,800.00
Jumlah.a 6,900.00
Upah
Kenek ht 1.2000 90,000.00 108,000.00
Tukang Cat ht 0.6000 72,000.00 43,200.00
Kep.Tukang ht 0.2000 108,000.00 21,600.00
Mandor ht 0.0667 126,000.00 8,400.00
Jumlah.b 181,200.00
Alat
Amplas Kayu lbr 0.8000 2,250.00 1,800.00
Kwas Cat 3" bh 0.0400 11,250.00 450.00
Compressor+Sprayer hk 0.0400 200,000.00 8,000.00
Jumlah.c 10,250.00
Jumlah.a+b+c 198,350.00

528975646.xls
Page 344 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

K1061 Cat Tembok Dalam/m2


Bahan
Plamur Tembok Dalam kg 0.2000 15,000.00 3,000.00
Cat Tembok kg 0.1000 11,250.00 1,125.00
Jumlah.a 4,125.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tukang Cat ht 0.1000 72,000.00 7,200.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 28,200.00
Alat
Amplas lbr 2.0000 2,250.00 4,500.00
Kwas Cat 4" bh 0.0250 15,000.00 375.00
Roll Cat bh 0.0500 22,500.00 1,125.00
Jumlah.c 6,000.00
Jumlah.a+b+c 38,325.00

K1062 Cat Tembok Luar/m2


Bahan
Plamur Tembok Luar kg 0.2000 22,500.00 4,500.00
Cat Tembok kg 0.1000 15,000.00 1,500.00
Jumlah.a 6,000.00
Upah
Kenek ht 0.2000 90,000.00 18,000.00
Tukang Cat ht 0.1000 72,000.00 7,200.00
Kep.Tukang ht 0.0200 108,000.00 2,160.00
Mandor ht 0.0067 126,000.00 840.00
Jumlah.b 28,200.00
Alat
Amplas lbr 2.0000 2,250.00 4,500.00
Kwas Cat 4" bh 0.0250 15,000.00 375.00
Roll Cat bh 0.0500 22,500.00 1,125.00
Jumlah.c 6,000.00
Jumlah.a+b+c 40,200.00

528975646.xls
Page 345 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.INSTALASI SANITASI

Lantai1
AIR BERSIH
L1101 Pemipaan PVC AW dia 11/2"/m'
(Dibawah Tanah)
Bahan
Pipa dia 1 1/2" btg 0.2625 30,000.00 7,875.00
Sok & Knie bh 0.2500 3,750.00 937.50
Lem PVC tube 0.0938 11,250.00 1,055.25
Jumlah.a 9,867.75
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.0750 90,000.00 6,750.00
Tukang Pipa ht 0.0375 72,000.00 2,700.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 20,438.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 31,806.04

L1102 Pemipaan PVC AW dia 11/4"/m'


(Dibawah Tanah)
Bahan
Pipa dia 1 1/4" btg 0.2625 26,250.00 6,890.63
Sok & Knie bh 0.2500 3,750.00 937.50
Lem PVC tube 0.0781 11,250.00 878.63
Jumlah.a 8,706.75

528975646.xls
Page 346 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.0750 90,000.00 6,750.00
Tukang Pipa ht 0.0375 72,000.00 2,700.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 20,438.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 30,645.04

L1103 Pemipaan PVC AW dia 1"/m'


(Dibawah Tanah)
Bahan
Pipa dia 1" btg 0.2625 22,500.00 5,906.25
Sok & Knie bh 0.2500 3,750.00 937.50
Lem PVC tube 0.0625 11,250.00 703.13
Jumlah.a 7,546.88
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.0750 90,000.00 6,750.00
Tukang Pipa ht 0.0375 72,000.00 2,700.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 20,438.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 29,485.16

L1104 Pemipaan PVC AW dia 3/4"/m'


(Dibawah Lantai)
Bahan
Pipa dia 3/4" btg 0.2625 18,750.00 4,921.88
Sok & Knie bh 0.5000 3,375.00 1,687.50
Lem PVC tube 0.2000 11,250.00 2,250.00
Jumlah.a 8,859.38
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.0500 90,000.00 4,500.00
Tukang Pipa ht 0.0250 72,000.00 1,800.00
Kep.Tukang ht 0.0083 108,000.00 900.00
Mandor ht 0.0028 126,000.00 350.00
Jumlah.b 16,663.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 27,022.66

L1105 Pemipaan PVC AW dia 1/2"/m'


(Didalam Dinding)
Bahan
Pipa dia 1/2" btg 0.2625 15,000.00 3,937.50
Sok & Knie bh 1.0000 3,000.00 3,000.00
Lem PVC tube 0.2000 11,250.00 2,250.00
Jumlah.a 9,187.50

528975646.xls
Page 347 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tukang Pipa ht 0.0500 72,000.00 3,600.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 15,100.00
Alat
Pahat Besi bh 0.0200 30,000.00 600.00
Jumlah.c 600.00
Jumlah.a+b+c 24,887.50

L1106 Pemipaan PVC D dia 11/2"/m'


(Dibawah Tanah)
Bahan
Pipa dia 1 1/2" btg 0.2625 26,250.00 6,890.63
Sok & Knie bh 0.2500 3,750.00 937.50
Lem PVC tube 0.0625 11,250.00 703.13
Jumlah.a 8,531.25
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.0750 90,000.00 6,750.00
Tukang Pipa ht 0.0375 72,000.00 2,700.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 20,438.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 30,469.54

L1107 Pemipaan PVC D dia 11/4"/m'


(Dibawah Tanah)
Bahan
Pipa dia 1 1/4" btg 0.2625 22,500.00 5,906.25
Sok & Knie bh 0.2500 3,750.00 937.50
Lem PVC tube 0.0625 11,250.00 703.13
Jumlah.a 7,546.88
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.0750 90,000.00 6,750.00
Tukang Pipa ht 0.0375 72,000.00 2,700.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 20,438.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 29,485.16

L1108 Pemipaan PVC D dia 1"/m'


(Dibawah Tanah)
Bahan
Pipa dia 1" btg 0.2625 18,750.00 4,921.88
Sok & Knie bh 0.2500 3,750.00 937.50
Lem PVC tube 0.0625 11,250.00 703.13
Jumlah.a 6,562.50

528975646.xls
Page 348 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.0750 90,000.00 6,750.00
Tukang Pipa ht 0.0375 72,000.00 2,700.00
Kep.Tukang ht 0.0125 108,000.00 1,350.00
Mandor ht 0.0042 126,000.00 525.00
Jumlah.b 20,438.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 28,500.79

L1109 Pemipaan PVC D dia 3/4"/m'


(Dibawah Lantai)
Bahan
Pipa dia 3/4" btg 0.2625 15,000.00 3,937.50
Sok & Knie bh 0.5000 3,375.00 1,687.50
Lem PVC tube 0.2000 11,250.00 2,250.00
Jumlah.a 7,875.00
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.0500 90,000.00 4,500.00
Tukang Pipa ht 0.0250 72,000.00 1,800.00
Kep.Tukang ht 0.0083 108,000.00 900.00
Mandor ht 0.0028 126,000.00 350.00
Jumlah.b 16,663.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 26,038.29

L1110 Pemipaan PVC D dia 1/2"/m'


(Didalam Dinding)
Bahan
Pipa dia 1/2" btg 0.2625 11,250.00 2,953.13
Sok & Knie bh 1.0000 3,000.00 3,000.00
Lem PVC tube 0.2000 11,250.00 2,250.00
Jumlah.a 8,203.13
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tukang Pipa ht 0.0500 72,000.00 3,600.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 15,100.00
Alat
Pahat Besi bh 0.0200 30,000.00 600.00
Jumlah.c 600.00
Jumlah.a+b+c 23,903.13

L1111 Bak Meter PAM 30x40cm/bh Pas.Bataco Semen


Galian Tanah m3 0.1500 47,853.90 7,178.09
Pemadatan Tanah m2 0.3000 4,838.00 1,451.40
Urugan Pasir T.5cm m3 0.0150 308,550.00 4,628.25
Pas.Bataco Semen 1:4 m2 0.9000 66,214.85 59,593.37
Plesteran Bata 1:4 m2 0.7000 46,223.00 32,356.10
Urugan Tanah Kembali m3 0.0500 23,926.95 1,196.35
Plat Fibre Tutup m2 0.3000 66,214.85 19,864.46
Acian Luar m2 0.1200 28,887.50 3,466.50
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah VIII.4 205,992.00

528975646.xls
Page 349 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1112 Bak Meter PAM 30x40cm/bh Pas.Bata Kampung


Galian Tanah m3 0.1500 47,853.90 7,178.09
Pemadatan Tanah m2 0.3000 4,838.00 1,451.40
Urugan Pasir T.5cm m3 0.0150 308,550.00 4,628.25
Pas.Bata Kampung 1:4 m2 0.9000 79,727.75 71,754.98
Plesteran Bata 1:4 m2 0.7000 46,223.00 32,356.10
Urugan Tanah Kembali m3 0.0500 23,926.95 1,196.35
Plat Fibre Tutup m2 0.3000 79,727.75 23,918.33
Acian Luar m2 0.1200 28,887.50 3,466.50
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah VIII.4 222,207.48

L1113 Bak Meter PAM 30x40cm/bh Pas.Bata Kuo Shin


Galian Tanah m3 0.1500 47,853.90 7,178.09
Pemadatan Tanah m2 0.3000 4,838.00 1,451.40
Urugan Pasir T.5cm m3 0.0150 308,550.00 4,628.25
Pas.Bata Kuo Shin 1:4 m2 0.9000 91,531.34 82,378.21
Plesteran Bata 1:4 m2 0.7000 46,223.00 32,356.10
Urugan Tanah Kembali m3 0.0500 23,926.95 1,196.35
Plat Fibre Tutup m2 0.3000 91,531.34 27,459.40
Acian Luar m2 0.1200 28,887.50 3,466.50
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah VIII.4 236,371.79

L1114 Bak Meter PAM 30x40cm/bh Pas.Bata Press


Galian Tanah m3 0.1500 47,853.90 7,178.09
Pemadatan Tanah m2 0.3000 4,838.00 1,451.40
Urugan Pasir T.5cm m3 0.0150 308,550.00 4,628.25
Pas.Bata Press 1:4 m2 0.9000 88,940.00 80,046.00
Plesteran Bata 1:4 m2 0.7000 46,223.00 32,356.10
Urugan Tanah Kembali m3 0.0500 23,926.95 1,196.35
Plat Fibre Tutup m2 0.3000 88,940.00 26,682.00
Acian Luar m2 0.1200 28,887.50 3,466.50
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah VIII.4 233,262.18

L1115 Bak Meter PAM 30x40cm/bh Pas.Batu Hebel T.10cm


Galian Tanah m3 0.1500 47,853.90 7,178.09
Pemadatan Tanah m2 0.3000 4,838.00 1,451.40
Urugan Pasir T.5cm m3 0.0150 308,550.00 4,628.25
Pas.Bata Hebel 1:4 m2 0.9000 124,527.35 112,074.62
Plesteran Bata 1:4 m2 0.7000 46,223.00 32,356.10
Urugan Tanah Kembali m3 0.0500 23,926.95 1,196.35
Plat Fibre Tutup m2 0.3000 124,527.35 37,358.21
Acian Luar m2 0.1200 28,887.50 3,466.50
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah VIII.4 275,967.00

L1116 Bak Meter PAM 30x40cm/bh Pas.Batu Hebel T.7,5cm


Galian Tanah m3 0.1500 47,853.90 7,178.09
Pemadatan Tanah m2 0.3000 4,838.00 1,451.40
Urugan Pasir T.5cm m3 0.0150 308,550.00 4,628.25
Pas.Bata Hebel 1:4 m2 0.9000 97,730.00 87,957.00
Plesteran Bata 1:4 m2 0.7000 46,223.00 32,356.10
Urugan Tanah Kembali m3 0.0500 23,926.95 1,196.35
Plat Fibre Tutup m2 0.3000 97,730.00 29,319.00
Acian Luar m2 0.1200 28,887.50 3,466.50
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah VIII.4 243,810.18

L1117 Ground Tank Kap.1,00M3/bh (Uk.1,00x1,00x1,50M)


Bouwplank m' 14.0000 31,257.17 437,600.33
Galian Tanah m3 10.1568 59,683.20 606,190.33
Pemadatan Tanah m2 1.9600 4,838.00 9,482.48
Urugan Pasir T.10cm m3 0.1960 308,550.00 60,475.80
Lantai Kerja T.5cm m2 1.9600 48,072.75 94,222.59
Waterproofing Bawah Membrane m2 1.9600 112,500.00 220,500.00
Pembesian Lantai dia 1010 Single kg 14.9300 13,546.25 202,245.51
Cor Beton Lantai T.10cm 1:1,5:2,5 m3 0.1440 982,050.00 141,415.20
Pembesian Dinding dia 1010 Tegak kg 48.8664 13,546.25 661,956.47
Pembesian Dinding dia 820 Datar kg 17.5973 13,546.25 238,377.43
Bekisting Dinding m2 13.4800 103,843.50 1,399,810.38

528975646.xls
Page 350 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Cor Beton Dinding T.10cm 1:1,5:2,5 m3 0.6160 982,050.00 604,942.80
Bekisting Tutup m2 1.4400 103,843.50 149,534.64
Waterproofing Dinding Luar Membrane m2 7.0400 112,500.00 792,000.00
Waterproofing Dinding Dalam Coating m2 6.0000 90,000.00 540,000.00
Pembesian Tutup dia 1010 Horis.Gbr kg 8.9588 13,546.25 121,358.14
Pembesian Tutup dia 1010 Verti.Gbr kg 8.9588 13,546.25 121,358.14
Cor Beton Tutup T.10cm 1:1,5:2,5 m3 0.1440 982,050.00 141,415.20
Waterproofing Atas Tutup Coating m2 1.4400 90,000.00 129,600.00
Keramik Dinding Dalam 20x20cm m2 6.0000 135,623.00 813,738.00
Keramik Lantai Dalam 20x20cm m2 1.0000 121,120.00 121,120.00
Urugan Tanah Kembali ex.Galian m3 3.9200 29,841.60 116,979.07
Acian Luar Bagian yg Tampak m2 2.4000 28,887.50 69,330.00
Tutup Besi Man Hole 50x50cm bh 1.0000 384,774.79 384,774.79
Jumlah 8,178,427.31

L1118 Ground Tank Kap.1,50M3/bh (Uk.1,50x1,00x1,50M)


Bouwplank m' 15.0000 31,257.17 468,857.50
Galian Tanah m3 14.1028 59,683.20 841,700.23
Pemadatan Tanah m2 2.6600 4,838.00 12,869.08
Urugan Pasir T.10cm m3 0.2660 308,550.00 82,074.30
Lantai Kerja T.5cm m2 2.6600 48,072.75 127,873.52
Waterproofing Bawah Membrane m2 2.6600 112,500.00 299,250.00
Pembesian Lantai dia 1010 Single kg 22.0577 13,546.25 298,799.12
Cor Beton Lantai T.10cm 1:1,5:2,5 m3 0.2040 982,050.00 200,338.20
Pembesian Dinding dia 1010 Tegak kg 59.0469 13,546.25 799,864.07
Pembesian Dinding dia 820 Datar kg 19.1180 13,546.25 258,977.21
Bekisting Dinding m2 16.1400 103,843.50 1,676,034.09
Cor Beton Dinding T.10cm 1:1,5:2,5 m3 0.8100 982,050.00 795,460.50
Bekisting Tutup m2 2.0400 103,843.50 211,840.74
Waterproofing Dinding Luar Membrane m2 8.6400 112,500.00 972,000.00
Waterproofing Dinding Dalam Coating m2 7.5000 90,000.00 675,000.00
Pembesian Tutup dia 1010 Melintang kg 13.8454 13,546.25 187,553.25
Pembesian Tutup dia 1010 Memanjang kg 12.6916 13,546.25 171,923.59
Cor Beton Tutup T.10cm 1:1,5:2,5 m3 0.2040 982,050.00 200,338.20
Waterproofing Atas Tutup Coating m2 2.0400 90,000.00 183,600.00
Keramik Dinding Dalam 20x20cm m2 7.5000 135,623.00 1,017,172.50
Keramik Lantai Dalam 20x20cm m2 1.5000 121,120.00 181,680.00
Urugan Tanah Kembali ex.Galian m3 5.3200 29,841.60 158,757.31
Acian Luar Bagian yg Tampak m2 3.2000 28,887.50 92,440.00
Tutup Besi Man Hole 50x50cm bh 1.0000 384,774.79 384,774.79
Jumlah 10,299,178.20

L1119 Ground Tank Kap.2,00M3/bh (Uk.2,00x1,00x1,50M)


Bouwplank m' 17.8000 31,257.17 556,377.57
Galian Tanah m3 16.3559 59,683.20 976,172.45
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir T.10cm m3 0.3360 308,550.00 103,672.80
Lantai Kerja T.5cm m2 3.3600 48,072.75 161,524.44
Waterproofing Bawah Membrane m2 3.3600 112,500.00 378,000.00
Pembesian Lantai dia 1010 Single kg 33.5277 13,546.25 454,174.61
Cor Beton Lantai T.10cm 1:1,5:2,5 m3 0.2640 982,050.00 259,261.20
Pembesian Dinding dia 1010 Tegak kg 73.2996 13,546.25 992,934.71
Pembesian Dinding dia 820 Datar kg 22.5940 13,546.25 306,063.97
Bekisting Dinding m2 19.2400 103,843.50 1,997,948.94
Cor Beton Dinding T.10cm 1:1,5:2,5 m3 0.9600 982,050.00 942,768.00
Bekisting Tutup m2 2.6800 103,843.50 278,300.58
Waterproofing Dinding Luar Membrane m2 10.8800 112,500.00 1,224,000.00
Waterproofing Dinding Dalam Coating m2 9.0000 90,000.00 810,000.00
Pembesian Tutup dia 1010 Melintang kg 17.1032 13,546.25 231,684.22
Pembesian Tutup dia 1010 Memanjang kg 16.4245 13,546.25 222,490.38
Cor Beton Tutup T.10cm 1:1,5:2,5 m3 0.2640 982,050.00 259,261.20
Waterproofing Atas Tutup Coating m2 2.6400 90,000.00 237,600.00
Keramik Dinding Dalam 20x20cm m2 9.0000 135,623.00 1,220,607.00
Keramik Lantai Dalam 20x20cm m2 2.0000 121,120.00 242,240.00
Urugan Tanah Kembali ex.Galian m3 6.7200 29,841.60 200,535.55
Acian Luar Bagian yg Tampak m2 4.0000 28,887.50 115,550.00
Tutup Besi Man Hole 50x50cm bh 1.0000 384,774.79 384,774.79
Jumlah 12,572,198.10

528975646.xls
Page 351 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1120 Ground Tank Kap.2,50M3/bh (Uk.1,60x1,60x1,50M)


Bouwplank m' 18.2000 31,257.17 568,880.43
Galian Tanah m3 17.8872 59,683.20 1,067,565.34
Pemadatan Tanah m2 4.0000 4,838.00 19,352.00
Urugan Pasir T.10cm m3 0.4000 308,550.00 123,420.00
Lantai Kerja T.5cm m2 4.0000 48,072.75 192,291.00
Waterproofing Bawah Membrane m2 4.0000 112,500.00 450,000.00
Pembesian Lantai dia 1010 Single kg 46.4230 13,546.25 628,857.56
Cor Beton Lantai T.10cm 1:1,5:2,5 m3 0.3240 982,050.00 318,184.20
Pembesian Dinding dia 1010 Tegak kg 73.2996 13,546.25 992,934.71
Pembesian Dinding dia 820 Datar kg 27.3735 13,546.25 370,808.27
Bekisting Dinding m2 21.1200 103,843.50 2,193,174.72
Cor Beton Dinding T.10cm 1:1,5:2,5 m3 1.0200 982,050.00 1,001,691.00
Bekisting Tutup m2 4.0000 103,843.50 415,374.00
Waterproofing Dinding Luar Membrane m2 11.5200 112,500.00 1,296,000.00
Waterproofing Dinding Dalam Coating m2 9.6000 90,000.00 864,000.00
Pembesian Tutup dia 1010 Melintang kg 23.2115 13,546.25 314,428.78
Pembesian Tutup dia 1010 Memanjang kg 23.2115 13,546.25 314,428.78
Cor Beton Tutup T.10cm 1:1,5:2,5 m3 0.3240 982,050.00 318,184.20
Waterproofing Atas Tutup Coating m2 3.2400 90,000.00 291,600.00
Keramik Dinding Dalam 20x20cm m2 9.6000 135,623.00 1,301,980.80
Keramik Lantai Dalam 20x20cm m2 2.5600 121,120.00 310,067.20
Urugan Tanah Kembali ex.Galian m3 8.0000 29,841.60 238,732.80
Acian Luar Bagian yg Tampak m2 4.6800 28,887.50 135,193.50
Tutup Besi Man Hole 50x50cm bh 1.0000 384,774.79 384,774.79
Jumlah 14,111,924.09

L1121 Ground Tank Kap.3,00M3/bh (Uk.2,00x1,50x1,50M)


Bouwplank m' 19.6000 31,257.17 612,640.47
Galian Tanah m3 21.8815 59,683.20 1,305,957.94
Pemadatan Tanah m2 4.5600 4,838.00 22,061.28
Urugan Pasir T.10cm m3 0.4560 308,550.00 140,698.80
Lantai Kerja T.5cm m2 4.5600 48,072.75 219,211.74
Waterproofing Bawah Membrane m2 4.5600 112,500.00 513,000.00
Pembesian Lantai dia 1010 Single kg 50.6310 13,546.25 685,860.18
Cor Beton Lantai T.10cm 1:1,5:2,5 m3 0.3740 982,050.00 367,286.70
Pembesian Dinding dia 1010 Tegak kg 95.0180 13,546.25 1,287,137.58
Pembesian Dinding dia 820 Datar kg 27.3735 13,546.25 370,808.27
Bekisting Dinding m2 22.9800 103,843.50 2,386,323.63
Cor Beton Dinding T.10cm 1:1,5:2,5 m3 1.1700 982,050.00 1,148,998.50
Bekisting Tutup m2 4.5600 103,843.50 473,526.36
Waterproofing Dinding Luar Membrane m2 12.4800 112,500.00 1,404,000.00
Waterproofing Dinding Dalam Coating m2 10.5000 90,000.00 945,000.00
Pembesian Tutup dia 1010 Melintang kg 24.9422 13,546.25 337,873.28
Pembesian Tutup dia 1010 Memanjang kg 24.9760 13,546.25 338,331.14
Cor Beton Tutup T.10cm 1:1,5:2,5 m3 0.3740 982,050.00 367,286.70
Waterproofing Atas Tutup Coating m2 3.7400 90,000.00 336,600.00
Keramik Dinding Dalam 20x20cm m2 10.5000 135,623.00 1,424,041.50
Keramik Lantai Dalam 20x20cm m2 3.0000 121,120.00 363,360.00
Urugan Tanah Kembali ex.Galian m3 9.1200 29,841.60 272,155.39
Acian Luar Bagian yg Tampak m2 5.3000 28,887.50 153,103.75
Tutup Besi Man Hole 50x50cm bh 1.0000 384,774.79 384,774.79
Jumlah 15,860,038.01

PIPA AIR KOTOR


L1222 Pemipaan PVC AW dia 1,5"/m'
(Bawah Wastafel/K'Zink)
Bahan
Pipa dia 1,5" btg 0.2625 30,000.00 7,875.00
Sok & Knie bh 1.0000 4,125.00 4,125.00
Lem PVC tube 0.2000 11,250.00 2,250.00
Jumlah.a 14,250.00
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tukang Pipa ht 0.0500 72,000.00 3,600.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 15,100.00
Jumlah.a+b 29,350.00

528975646.xls
Page 352 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1223 Pemipaan PVC AW dia 2"/m'


(Bawah Lantai)
Bahan
Pipa dia 2" btg 0.2625 37,500.00 9,843.75
Sok & Knie bh 1.0000 4,500.00 4,500.00
Lem PVC tube 0.3000 11,250.00 3,375.00
Jumlah.a 17,718.75
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.1000 90,000.00 9,000.00
Tukang Pipa ht 0.0500 72,000.00 3,600.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 24,213.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 43,432.04

L1224 Pemipaan PVC AW dia 3"/m'


(Bawah Lantai)
Bahan
Pipa dia 3" btg 0.2625 45,000.00 11,812.50
Sok & Knie bh 1.0000 6,000.00 6,000.00
Lem PVC tube 0.4000 11,250.00 4,500.00
Jumlah.a 22,312.50
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.1250 90,000.00 11,250.00
Tukang Pipa ht 0.0625 72,000.00 4,500.00
Kep.Tukang ht 0.0208 108,000.00 2,250.00
Mandor ht 0.0069 126,000.00 875.00
Jumlah.b 27,988.29
Alat
Pahat Besi bh 0.0200 30,000.00 600.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,800.00
Jumlah.a+b+c 52,100.79

L1225 Pemipaan PVC AW dia 4"/m'


(Bawah Lantai)
Bahan
Pipa dia 4" btg 0.2625 60,000.00 15,750.00
Sok & Knie bh 1.0000 7,500.00 7,500.00
Lem PVC tube 0.5000 11,250.00 5,625.00
Jumlah.a 28,875.00
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.1500 90,000.00 13,500.00
Tukang Pipa ht 0.0750 72,000.00 5,400.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 31,763.29
Alat
Pahat Besi bh 0.0500 30,000.00 1,500.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 2,700.00
Jumlah.a+b+c 63,338.29

528975646.xls
Page 353 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1226 Pemipaan PVC AW dia 5"/m'


(Bawah Lantai)
Bahan
Pipa dia 5" btg 0.2625 75,000.00 19,687.50
Sok & Knie bh 1.0000 9,000.00 9,000.00
Lem PVC tube 0.5000 11,250.00 5,625.00
Jumlah.a 34,312.50
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.1750 90,000.00 15,750.00
Tukang Pipa ht 0.0875 72,000.00 6,300.00
Kep.Tukang ht 0.0292 108,000.00 3,150.00
Mandor ht 0.0097 126,000.00 1,225.00
Jumlah.b 35,538.29
Alat
Pahat Besi bh 0.1000 30,000.00 3,000.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 4,200.00
Jumlah.a+b+c 74,050.79

L1227 Pemipaan PVC DAW dia 6"/m'


(Bawah Lantai)
Bahan
Pipa dia 6" btg 0.2625 90,000.00 23,625.00
Sok & Knie bh 1.0000 9,000.00 9,000.00
Lem PVC tube 0.6000 11,250.00 6,750.00
Jumlah.a 39,375.00
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.2500 90,000.00 22,500.00
Tukang Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0417 108,000.00 4,500.00
Mandor ht 0.0139 126,000.00 1,750.00
Jumlah.b 46,863.29
Alat
Pahat Besi bh 0.1250 30,000.00 3,750.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 4,950.00
Jumlah.a+b+c 91,188.29

L1228 Pemipaan PVC D dia 1,5"/m'


(Bawah Wastafel/K'Zink)
Bahan
Pipa dia 1,5" btg 0.2625 26,250.00 6,890.63
Sok & Knie bh 1.0000 4,125.00 4,125.00
Lem PVC tube 0.2000 11,250.00 2,250.00
Jumlah.a 13,265.63
Upah
Kenek ht 0.1000 90,000.00 9,000.00
Tukang Pipa ht 0.0500 72,000.00 3,600.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 15,100.00
Jumlah.a+b 28,365.63

L1229 Pemipaan PVC D dia 2"/m'


(Bawah Lantai)
Bahan
Pipa dia 2" btg 0.2625 30,000.00 7,875.00
Sok & Knie bh 1.0000 4,500.00 4,500.00
Lem PVC tube 0.3000 11,250.00 3,375.00
Jumlah.a 15,750.00

528975646.xls
Page 354 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.1000 90,000.00 9,000.00
Tukang Pipa ht 0.0500 72,000.00 3,600.00
Kep.Tukang ht 0.0167 108,000.00 1,800.00
Mandor ht 0.0056 126,000.00 700.00
Jumlah.b 24,213.29
Alat
Pahat Besi bh 0.0100 30,000.00 300.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,500.00
Jumlah.a+b+c 41,463.29

L1230 Pemipaan PVC D dia 3"/m'


(Bawah Lantai)
Bahan
Pipa dia 3" btg 0.2625 41,250.00 10,828.13
Sok & Knie bh 1.0000 6,000.00 6,000.00
Lem PVC tube 0.4000 11,250.00 4,500.00
Jumlah.a 21,328.13
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.1250 90,000.00 11,250.00
Tukang Pipa ht 0.0625 72,000.00 4,500.00
Kep.Tukang ht 0.0208 108,000.00 2,250.00
Mandor ht 0.0069 126,000.00 875.00
Jumlah.b 27,988.29
Alat
Pahat Besi bh 0.0200 30,000.00 600.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 1,800.00
Jumlah.a+b+c 51,116.41

L1231 Pemipaan PVC D dia 4"/m'


(Bawah Lantai)
Bahan
Pipa dia 4" btg 0.2625 52,500.00 13,781.25
Sok & Knie bh 1.0000 7,500.00 7,500.00
Lem PVC tube 0.5000 11,250.00 5,625.00
Jumlah.a 26,906.25
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.1500 90,000.00 13,500.00
Tukang Pipa ht 0.0750 72,000.00 5,400.00
Kep.Tukang ht 0.0250 108,000.00 2,700.00
Mandor ht 0.0083 126,000.00 1,050.00
Jumlah.b 31,763.29
Alat
Pahat Besi bh 0.0500 30,000.00 1,500.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 2,700.00
Jumlah.a+b+c 61,369.54

L1232 Pemipaan PVC D dia 5"/m'


(Bawah Lantai)
Bahan
Pipa dia 5" btg 0.2625 67,500.00 17,718.75
Sok & Knie bh 1.0000 9,000.00 9,000.00
Lem PVC tube 0.5000 11,250.00 5,625.00
Jumlah.a 32,343.75

528975646.xls
Page 355 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.1750 90,000.00 15,750.00
Tukang Pipa ht 0.0875 72,000.00 6,300.00
Kep.Tukang ht 0.0292 108,000.00 3,150.00
Mandor ht 0.0097 126,000.00 1,225.00
Jumlah.b 35,538.29
Alat
Pahat Besi bh 0.1000 30,000.00 3,000.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 4,200.00
Jumlah.a+b+c 72,082.04

L1233 Pemipaan PVC D dia 6"/m'


(Bawah Lantai)
Bahan
Pipa dia 6" btg 0.2625 82,500.00 21,656.25
Sok & Knie bh 1.0000 9,000.00 9,000.00
Lem PVC tube 0.6000 11,250.00 6,750.00
Jumlah.a 37,406.25
Upah
Galian Tanah m3 0.1000 47,853.90 4,785.39
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Urugan Tanah Kembali m3 0.1000 23,926.95 2,392.70
Pamadatan Tanah m2 0.2000 4,838.00 967.60
Kenek ht 0.2500 90,000.00 22,500.00
Tukang Pipa ht 0.1250 72,000.00 9,000.00
Kep.Tukang ht 0.0417 108,000.00 4,500.00
Mandor ht 0.0139 126,000.00 1,750.00
Jumlah.b 46,863.29
Alat
Pahat Besi bh 0.1250 30,000.00 3,750.00
Blencong bh 0.0100 70,000.00 700.00
Pacul bh 0.0100 50,000.00 500.00
Jumlah.c 4,950.00
Jumlah.a+b+c 89,219.54

L1234 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bataco Semen


Galian Tanah m3 0.0621 47,853.90 2,971.73
Pemadatan Tanah m2 0.2025 4,838.00 979.70
Urugan Pasir T.5cm m3 0.0101 308,550.00 3,124.07
Pas.Bataco Semen 1:4 m2 0.3200 66,214.85 21,188.75
Cor Beton Dasar T.5cm 1:2:3 m3 0.0160 926,925.00 14,830.80
Plesteran bag.Dalam & Tampak m2 0.6100 46,223.00 28,196.03
Urugan Tanah Kembali m3 0.0279 23,926.95 668.64
Plat Beton Tutup T.5cm m3 0.0045 926,925.00 4,171.16
Besi Plat Tutup dia 8mm Polos kg 1.0428 13,546.25 14,126.03
Acian Plesteran m2 0.6100 28,887.50 17,621.38
Sekonengan Sudut m' 2.2000 17,331.25 38,128.75
Jumlah 146,007.03

L1235 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Kampung


Galian Tanah m3 0.0621 47,853.90 2,971.73
Pemadatan Tanah m2 0.2025 4,838.00 979.70
Urugan Pasir T.5cm m3 0.0101 308,550.00 3,124.07
Pas.Bata Kampung 1:4 m2 0.3200 79,727.75 25,512.88
Cor Beton Dasar T.5cm 1:2:3 m3 0.0160 926,925.00 14,830.80
Plesteran bag.Dalam & Tampak m2 0.6100 46,223.00 28,196.03
Urugan Tanah Kembali m3 0.0279 23,926.95 668.64
Plat Beton Tutup T.5cm m3 0.0045 926,925.00 4,171.16
Besi Plat Tutup dia 8mm Polos kg 1.0428 13,546.25 14,126.03
Acian Plesteran m2 0.6100 28,887.50 17,621.38
Sekonengan Sudut m' 2.2000 17,331.25 38,128.75
Jumlah 150,331.16

528975646.xls
Page 356 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1236 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Kuo Shin


Galian Tanah m3 0.0621 47,853.90 2,971.73
Pemadatan Tanah m2 0.2025 4,838.00 979.70
Urugan Pasir T.5cm m3 0.0101 308,550.00 3,124.07
Pas.Bata Kuo Shin 1:4 m2 0.3200 91,531.34 29,290.03
Cor Beton Dasar T.5cm 1:2:3 m3 0.0160 926,925.00 14,830.80
Plesteran bag.Dalam & Tampak m2 0.6100 46,223.00 28,196.03
Urugan Tanah Kembali m3 0.0279 23,926.95 668.64
Plat Beton Tutup T.5cm m3 0.0045 926,925.00 4,171.16
Besi Plat Tutup dia 8mm Polos kg 1.0428 13,546.25 14,126.03
Acian Plesteran m2 0.6100 28,887.50 17,621.38
Sekonengan Sudut m' 2.2000 17,331.25 38,128.75
Jumlah 154,108.31

L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press


Galian Tanah m3 0.0621 47,853.90 2,971.73
Pemadatan Tanah m2 0.2025 4,838.00 979.70
Urugan Pasir T.5cm m3 0.0101 308,550.00 3,124.07
Pas.Bata Press 1:4 m2 0.3200 88,940.00 28,460.80
Cor Beton Dasar T.5cm 1:2:3 m3 0.0160 926,925.00 14,830.80
Plesteran bag.Dalam & Tampak m2 0.6100 46,223.00 28,196.03
Urugan Tanah Kembali m3 0.0279 23,926.95 668.64
Plat Beton Tutup T.5cm m3 0.0045 926,925.00 4,171.16
Besi Plat Tutup dia 8mm Polos kg 1.0428 13,546.25 14,126.03
Acian Plesteran m2 0.6100 28,887.50 17,621.38
Sekonengan Sudut m' 2.2000 17,331.25 38,128.75
Jumlah 153,279.08

L1238 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Hebel T.10cm


Galian Tanah m3 0.0621 47,853.90 2,971.73
Pemadatan Tanah m2 0.2025 4,838.00 979.70
Urugan Pasir T.5cm m3 0.0101 308,550.00 3,124.07
Pas.Bata Hebel T.10cm 1:4 m2 0.3200 124,527.35 39,848.75
Cor Beton Dasar T.5cm 1:2:3 m3 0.0160 926,925.00 14,830.80
Plesteran bag.Dalam & Tampak m2 0.6100 46,223.00 28,196.03
Urugan Tanah Kembali m3 0.0279 23,926.95 668.64
Plat Beton Tutup T.5cm m3 0.0045 926,925.00 4,171.16
Besi Plat Tutup dia 8mm Polos kg 1.0428 13,546.25 14,126.03
Acian Plesteran m2 0.6100 28,887.50 17,621.38
Sekonengan Sudut m' 2.2000 17,331.25 38,128.75
Jumlah 164,667.03

L1239 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Hebel T.7,5cm


Galian Tanah m3 0.0621 47,853.90 2,971.73
Pemadatan Tanah m2 0.2025 4,838.00 979.70
Urugan Pasir T.5cm m3 0.0101 308,550.00 3,124.07
Pas.Bata Hebel T.7,5cm 1:4 m2 0.3200 97,730.00 31,273.60
Cor Beton Dasar T.5cm 1:2:3 m3 0.0160 926,925.00 14,830.80
Plesteran bag.Dalam & Tampak m2 0.6100 46,223.00 28,196.03
Urugan Tanah Kembali m3 0.0279 23,926.95 668.64
Plat Beton Tutup T.5cm m3 0.0045 926,925.00 4,171.16
Besi Plat Tutup dia 8mm Polos kg 1.0428 13,546.25 14,126.03
Acian Plesteran m2 0.6100 28,887.50 17,621.38
Sekonengan Sudut m' 2.2000 17,331.25 38,128.75
Jumlah 156,091.88

L1240 Bak Kontrol 30x30x30cm/bh 1Pc:4Psr dgn Bataco Semen


Galian Tanah m3 0.1690 47,853.90 8,087.31
Pemadatan Tanah m2 0.4225 4,838.00 2,044.06
Urugan Pasir T.5cm m3 0.0211 308,550.00 6,518.12
Pas.Bataco Semen 1:4 m2 0.5400 66,214.85 35,756.02
Cor Beton Dasar T.5cm 1:2:3 m3 0.0270 926,925.00 25,026.98
Plesteran bag.Dalam & Tampak m2 0.8900 46,223.00 41,138.47
Urugan Tanah Kembali m3 0.0761 23,926.95 1,819.64
Plat Beton Tutup T.5cm m3 0.0080 926,925.00 7,415.40
Besi Plat Tutup dia 8mm Polos kg 1.7380 13,546.25 23,543.38
Acian Plesteran m2 0.8900 28,887.50 25,709.88
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah 253,316.75

528975646.xls
Page 357 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1241 Bak Kontrol 30x30x30cm/bh 1Pc:4Psr dgn Bata Kampung


Galian Tanah m3 0.1690 47,853.90 8,087.31
Pemadatan Tanah m2 0.4225 4,838.00 2,044.06
Urugan Pasir T.5cm m3 0.0211 308,550.00 6,518.12
Pas.Bata Kampung 1:4 m2 0.5400 79,727.75 43,052.99
Cor Beton Dasar T.5cm 1:2:3 m3 0.0270 926,925.00 25,026.98
Plesteran Bata bag.Dalam m2 0.8900 46,223.00 41,138.47
Urugan Tanah Kembali m3 0.0761 23,926.95 1,819.64
Plat Beton Tutup T.5cm m3 0.0080 926,925.00 7,415.40
Besi Plat Tutup dia 8mm Polos kg 1.7380 13,546.25 23,543.38
Acian Plesteran m2 0.8900 28,887.50 25,709.88
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah 260,613.71

L1242 Bak Kontrol 30x30x30cm/bh 1Pc:4Psr dgn Bata Kuo Shin


Galian Tanah m3 0.1690 47,853.90 8,087.31
Pemadatan Tanah m2 0.4225 4,838.00 2,044.06
Urugan Pasir T.5cm m3 0.0211 308,550.00 6,518.12
Pas.Bata Kuo Shin 1:4 m2 0.5400 91,531.34 49,426.92
Cor Beton Dasar T.5cm 1:2:3 m3 0.0270 926,925.00 25,026.98
Plesteran Bata bag.Dalam m2 0.8900 46,223.00 41,138.47
Urugan Tanah Kembali m3 0.0761 23,926.95 1,819.64
Plat Beton Tutup T.5cm m3 0.0080 926,925.00 7,415.40
Besi Plat Tutup dia 8mm Polos kg 1.7380 13,546.25 23,543.38
Acian Plesteran m2 0.8900 28,887.50 25,709.88
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah 266,987.65

L1243 Bak Kontrol 30x30x30cm/bh 1Pc:4Psr dgn Bata Press


Galian Tanah m3 0.1690 47,853.90 8,087.31
Pemadatan Tanah m2 0.4225 4,838.00 2,044.06
Urugan Pasir T.5cm m3 0.0211 308,550.00 6,518.12
Pas.Bata Press 1:4 m2 0.5400 88,940.00 48,027.60
Cor Beton Dasar T.5cm 1:2:3 m3 0.0270 926,925.00 25,026.98
Plesteran Bata bag.Dalam m2 0.8900 46,223.00 41,138.47
Urugan Tanah Kembali m3 0.0761 23,926.95 1,819.64
Plat Beton Tutup T.5cm m3 0.0080 926,925.00 7,415.40
Besi Plat Tutup dia 8mm Polos kg 1.7380 13,546.25 23,543.38
Acian Plesteran m2 0.8900 28,887.50 25,709.88
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah 265,588.33

L1244 Bak Kontrol 30x30x30cm/bh 1Pc:4Psr dgn Bata Hebel T.10cm


Galian Tanah m3 0.1690 47,853.90 8,087.31
Pemadatan Tanah m2 0.4225 4,838.00 2,044.06
Urugan Pasir T.5cm m3 0.0211 308,550.00 6,518.12
Pas.Bata Hebel T.10cm 1:4 m2 0.5400 124,527.35 67,244.77
Cor Beton Dasar T.5cm 1:2:3 m3 0.0270 926,925.00 25,026.98
Plesteran Bata Hebel bag.Dalam m2 0.8900 46,223.00 41,138.47
Urugan Tanah Kembali m3 0.0761 23,926.95 1,819.64
Plat Beton Tutup T.5cm m3 0.0080 926,925.00 7,415.40
Besi Plat Tutup dia 8mm Polos kg 1.7380 13,546.25 23,543.38
Acian Plesteran m2 0.8900 28,887.50 25,709.88
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah 284,805.50

L1245 Bak Kontrol 30x30x30cm/bh 1Pc:4Psr dgn Bata Hebel T.7,5cm


Galian Tanah m3 0.1690 47,853.90 8,087.31
Pemadatan Tanah m2 0.4225 4,838.00 2,044.06
Urugan Pasir T.5cm m3 0.0211 308,550.00 6,518.12
Pas.Bata Hebel T.7,5cm 1:4 m2 0.5400 97,730.00 52,774.20
Cor Beton Dasar T.5cm 1:2:3 m3 0.0270 926,925.00 25,026.98
Plesteran Bata Hebel bag.Dalam m2 0.8900 46,223.00 41,138.47
Urugan Tanah Kembali m3 0.0761 23,926.95 1,819.64
Plat Beton Tutup T.5cm m3 0.0080 926,925.00 7,415.40
Besi Plat Tutup dia 8mm Polos kg 1.7380 13,546.25 23,543.38
Acian Plesteran m2 0.8900 28,887.50 25,709.88
Sekonengan Sudut m' 4.4000 17,331.25 76,257.50
Jumlah 270,334.93

528975646.xls
Page 358 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1246 Bak Kontrol 40x40x40cm/bh 1Pc:4Psr dgn Bataco Semen


Galian Tanah m3 0.2812 47,853.90 13,456.52
Pemadatan Tanah m2 0.5625 4,838.00 2,721.38
Urugan Pasir T.5cm m3 0.0281 308,550.00 8,677.97
Pas.Bataco Semen 1:4 m2 0.9600 66,214.85 63,566.26
Cor Beton Dasar T.5cm 1:2:3 m3 0.0480 926,925.00 44,492.40
Plesteran bag.Dalam & Tampak m2 1.3800 46,223.00 63,787.74
Urugan Tanah Kembali m3 0.1265 23,926.95 3,027.72
Plat Beton Tutup T.5cm m3 0.0175 926,925.00 16,221.19
Besi Plat Tutup dia 1010mm Polos kg 4.0720 13,546.25 55,160.33
Acian Plesteran m2 1.3800 28,887.50 39,864.75
Sekonengan Sudut m' 5.0000 17,331.25 86,656.25
Jumlah 397,632.49

L1247 Bak Kontrol 40x40x40cm/bh 1Pc:4Psr dgn Bata Kampung


Galian Tanah m3 0.2812 47,853.90 13,456.52
Pemadatan Tanah m2 0.5625 4,838.00 2,721.38
Urugan Pasir T.5cm m3 0.0281 308,550.00 8,677.97
Pas.Bata Kampung 1:4 m2 0.9600 79,727.75 76,538.64
Cor Beton Dasar T.5cm 1:2:3 m3 0.0480 926,925.00 44,492.40
Plesteran bag.Dalam & Tampak m2 1.3800 46,223.00 63,787.74
Urugan Tanah Kembali m3 0.1265 23,926.95 3,027.72
Plat Beton Tutup T.5cm m3 0.0175 926,925.00 16,221.19
Besi Plat Tutup dia 1010mm Polos kg 4.0720 13,546.25 55,160.33
Acian Plesteran m2 1.3800 28,887.50 39,864.75
Sekonengan Sudut m' 5.0000 17,331.25 86,656.25
Jumlah 410,604.87

L1248 Bak Kontrol 40x40x40cm/bh 1Pc:4Psr dgn Bata Kuo Shin


Galian Tanah m3 0.2812 47,853.90 13,456.52
Pemadatan Tanah m2 0.5625 4,838.00 2,721.38
Urugan Pasir T.5cm m3 0.0281 308,550.00 8,677.97
Pas.Bata Kuo Shin 1:4 m2 0.9600 91,531.34 87,870.09
Cor Beton Dasar T.5cm 1:2:3 m3 0.0480 926,925.00 44,492.40
Plesteran bag.Dalam & Tampak m2 1.3800 46,223.00 63,787.74
Urugan Tanah Kembali m3 0.1265 23,926.95 3,027.72
Plat Beton Tutup T.5cm m3 0.0175 926,925.00 16,221.19
Besi Plat Tutup dia 1010mm Polos kg 4.0720 13,546.25 55,160.33
Acian Plesteran m2 1.3800 28,887.50 39,864.75
Sekonengan Sudut m' 5.0000 17,331.25 86,656.25
Jumlah 421,936.32

L1249 Bak Kontrol 40x40x40cm/bh 1Pc:4Psr dgn Bata Press


Galian Tanah m3 0.2812 47,853.90 13,456.52
Pemadatan Tanah m2 0.5625 4,838.00 2,721.38
Urugan Pasir T.5cm m3 0.0281 308,550.00 8,677.97
Pas.Bata Press 1:4 m2 0.9600 88,940.00 85,382.40
Cor Beton Dasar T.5cm 1:2:3 m3 0.0480 926,925.00 44,492.40
Plesteran bag.Dalam & Tampak m2 1.3800 46,223.00 63,787.74
Urugan Tanah Kembali m3 0.1265 23,926.95 3,027.72
Plat Beton Tutup T.5cm m3 0.0175 926,925.00 16,221.19
Besi Plat Tutup dia 1010mm Polos kg 4.0720 13,546.25 55,160.33
Acian Plesteran m2 1.3800 28,887.50 39,864.75
Sekonengan Sudut m' 5.0000 17,331.25 86,656.25
Jumlah 419,448.63

L1250 Bak Kontrol 40x40x40cm/bh 1Pc:4Psr dgn Bata Hebel T.10cm


Galian Tanah m3 0.2812 47,853.90 13,456.52
Pemadatan Tanah m2 0.5625 4,838.00 2,721.38
Urugan Pasir T.5cm m3 0.0281 308,550.00 8,677.97
Pas.Bata Hebel T.10cm 1:4 m2 0.9600 124,527.35 119,546.26
Cor Beton Dasar T.5cm 1:2:3 m3 0.0480 926,925.00 44,492.40
Plesteran bag.Dalam & Tampak m2 1.3800 46,223.00 63,787.74
Urugan Tanah Kembali m3 0.1265 23,926.95 3,027.72
Plat Beton Tutup T.5cm m3 0.0175 926,925.00 16,221.19
Besi Plat Tutup dia 1010mm Polos kg 4.0720 13,546.25 55,160.33
Acian Plesteran m2 1.3800 28,887.50 39,864.75
Sekonengan Sudut m' 5.0000 17,331.25 86,656.25
Jumlah 453,612.49

528975646.xls
Page 359 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1251 Bak Kontrol 40x40x40cm/bh 1Pc:4Psr dgn Bata Hebel T.7,5cm


Galian Tanah m3 0.2812 47,853.90 13,456.52
Pemadatan Tanah m2 0.5625 4,838.00 2,721.38
Urugan Pasir T.5cm m3 0.0281 308,550.00 8,677.97
Pas.Bata Hebel T.7,5cm 1:4 m2 0.9600 97,730.00 93,820.80
Cor Beton Dasar T.5cm 1:2:3 m3 0.0480 926,925.00 44,492.40
Plesteran bag.Dalam & Tampak m2 1.3800 46,223.00 63,787.74
Urugan Tanah Kembali m3 0.1265 23,926.95 3,027.72
Plat Beton Tutup T.5cm m3 0.0175 926,925.00 16,221.19
Besi Plat Tutup dia 1010mm Polos kg 4.0720 13,546.25 55,160.33
Acian Plesteran m2 1.3800 28,887.50 39,864.75
Sekonengan Sudut m' 5.0000 17,331.25 86,656.25
Jumlah 427,887.03

L1252 Bak Kontrol 50x50x50cm/bh 1Pc:4Psr dgn Bataco Semen


Galian Tanah m3 0.4335 47,853.90 20,744.67
Pemadatan Tanah m2 0.7225 4,838.00 3,495.46
Urugan Pasir T.5cm m3 0.0361 308,550.00 11,146.37
Pas.Bataco Semen 1:4 m2 1.4000 66,214.85 92,700.79
Cor Beton Dasar T.5cm 1:2:3 m3 0.0700 926,925.00 64,884.75
Plesteran bag.Dalam & Tampak m2 1.8600 46,223.00 85,974.78
Urugan Tanah Kembali m3 0.1951 23,926.95 4,667.55
Plat Beton Tutup T.5cm m3 0.0252 926,925.00 23,358.51
Besi Plat Tutup dia 10mm Polos kg 5.1828 13,546.25 70,207.50
Acian Plesteran m2 1.8600 28,887.50 53,730.75
Sekonengan Sudut m' 5.8000 17,331.25 100,521.25
Jumlah 531,432.37

L1253 Bak Kontrol 50x50x50cm/bh 1Pc:4Psr dgn Bata Kampung


Galian Tanah m3 0.4335 47,853.90 20,744.67
Pemadatan Tanah m2 0.7225 4,838.00 3,495.46
Urugan Pasir T.5cm m3 0.0361 308,550.00 11,146.37
Pas.Bata Kampung 1:4 m2 1.4000 79,727.75 111,618.85
Cor Beton Dasar T.5cm 1:2:3 m3 0.0700 926,925.00 64,884.75
Plesteran Bata bag.Dalam m2 1.8600 46,223.00 85,974.78
Urugan Tanah Kembali m3 0.1951 23,926.95 4,667.55
Plat Beton Tutup T.5cm m3 0.0252 926,925.00 23,358.51
Besi Plat Tutup dia 8mm Polos kg 5.1828 13,546.25 70,207.50
Acian Plesteran m2 1.8600 28,887.50 53,730.75
Sekonengan Sudut m' 5.8000 17,331.25 100,521.25
Jumlah 550,350.43

L1254 Bak Kontrol 50x50x50cm/bh 1Pc:4Psr dgn Bata Kuo Shin


Galian Tanah m3 0.4335 47,853.90 20,744.67
Pemadatan Tanah m2 0.7225 4,838.00 3,495.46
Urugan Pasir T.5cm m3 0.0361 308,550.00 11,146.37
Pas.Bata Kuo Shin 1:4 m2 1.4000 91,531.34 128,143.88
Cor Beton Dasar T.5cm 1:2:3 m3 0.0700 926,925.00 64,884.75
Plesteran Bata bag.Dalam m2 1.8600 46,223.00 85,974.78
Urugan Tanah Kembali m3 0.1951 23,926.95 4,667.55
Plat Beton Tutup T.5cm m3 0.0252 926,925.00 23,358.51
Besi Plat Tutup dia 8mm Polos kg 5.1828 13,546.25 70,207.50
Acian Plesteran m2 1.8600 28,887.50 53,730.75
Sekonengan Sudut m' 5.8000 17,331.25 100,521.25
Jumlah 566,875.46

L1256 Bak Kontrol 50x50x50cm/bh 1Pc:4Psr dgn Bata Press


Galian Tanah m3 0.4335 47,853.90 20,744.67
Pemadatan Tanah m2 0.7225 4,838.00 3,495.46
Urugan Pasir T.5cm m3 0.0361 308,550.00 11,146.37
Pas.Bata Press 1:4 m2 1.4000 88,940.00 124,516.00
Cor Beton Dasar T.5cm 1:2:3 m3 0.0700 926,925.00 64,884.75
Plesteran Bata bag.Dalam m2 1.8600 46,223.00 85,974.78
Urugan Tanah Kembali m3 0.1951 23,926.95 4,667.55
Plat Beton Tutup T.5cm m3 0.0252 926,925.00 23,358.51
Besi Plat Tutup dia 8mm Polos kg 5.1828 13,546.25 70,207.50
Acian Plesteran m2 1.8600 28,887.50 53,730.75
Sekonengan Sudut m' 5.8000 17,331.25 100,521.25
Jumlah 563,247.58

528975646.xls
Page 360 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1257 Bak Kontrol 50x50x50cm/bh 1Pc:4Psr dgn Bata Hebel T.10cm


Galian Tanah m3 0.4335 47,853.90 20,744.67
Pemadatan Tanah m2 0.7225 4,838.00 3,495.46
Urugan Pasir T.5cm m3 0.0361 308,550.00 11,146.37
Pas.Bata Hebel T.10cm 1:4 m2 1.4000 124,527.35 174,338.29
Cor Beton Dasar T.5cm 1:2:3 m3 0.0700 926,925.00 64,884.75
Plesteran Bata Hebel bag.Dalam m2 1.8600 46,223.00 85,974.78
Urugan Tanah Kembali m3 0.1951 23,926.95 4,667.55
Plat Beton Tutup T.5cm m3 0.0252 926,925.00 23,358.51
Besi Plat Tutup dia 8mm Polos kg 5.1828 13,546.25 70,207.50
Acian Plesteran m2 1.8600 28,887.50 53,730.75
Sekonengan Sudut m' 5.8000 17,331.25 100,521.25
Jumlah 613,069.87

L1258 Bak Kontrol 50x50x50cm/bh 1Pc:4Psr dgn Bata Hebel T.7,5cm


Galian Tanah m3 0.4335 47,853.90 20,744.67
Pemadatan Tanah m2 0.7225 4,838.00 3,495.46
Urugan Pasir T.5cm m3 0.0361 308,550.00 11,146.37
Pas.Bata Hebel T.7,5cm 1:4 m2 1.4000 97,730.00 136,822.00
Cor Beton Dasar T.5cm 1:2:3 m3 0.0700 926,925.00 64,884.75
Plesteran Bata Hebel bag.Dalam m2 1.8600 46,223.00 85,974.78
Urugan Tanah Kembali m3 0.1951 23,926.95 4,667.55
Plat Beton Tutup T.5cm m3 0.0252 926,925.00 23,358.51
Besi Plat Tutup dia 8mm Polos kg 5.1828 13,546.25 70,207.50
Acian Plesteran m2 1.8600 28,887.50 53,730.75
Sekonengan Sudut m' 5.8000 17,331.25 100,521.25
Jumlah 575,553.58

L1259 Septic Tank Kap.2,00M3 (1,00x2,00x1,50M)/bh Dind.Pas.Bataco Semen


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 5.5440 59,683.20 330,883.66
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.5544 308,550.00 171,060.12
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bataco Semen 1Pc:4Psr m2 9.9000 66,214.85 655,527.02
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 253,316.75 506,633.50
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.1088 23,926.95 26,530.20
Jumlah 5,165,791.58

L1260 Septic Tank Kap.2,00M3 (1,00x2,00x1,50M)/bh Dind.Pas.Bata Kampung


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 5.5440 59,683.20 330,883.66
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.5544 308,550.00 171,060.12
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Kampung 1Pc:4Psr m2 9.9000 79,727.75 789,304.73

528975646.xls
Page 361 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 260,613.71 521,227.43
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.1088 23,926.95 26,530.20
Jumlah 5,314,163.23

L1261 Septic Tank Kap.2,00M3 (1,00x2,00x1,50M)/bh Dind.Pas.Bata Kuo Shin


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 5.5440 59,683.20 330,883.66
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.5544 308,550.00 171,060.12
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Kuo Shin 1Pc:4Psr m2 9.9000 91,531.34 906,160.27
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 266,987.65 533,975.31
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.1088 23,926.95 26,530.20
Jumlah 5,443,766.64

L1262 Septic Tank Kap.2,00M3 (1,00x2,00x1,50M)/bh Dind.Pas.Bata Press


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 5.5440 59,683.20 330,883.66
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.5544 308,550.00 171,060.12
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Kuo Shin 1Pc:4Psr m2 9.9000 88,940.00 880,506.00
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58

528975646.xls
Page 362 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 265,588.33 531,176.66
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.1088 23,926.95 26,530.20
Jumlah 5,415,313.73

L1263 Septic Tank Kap.2,00M3 (1,00x2,00x1,50M)/bh Dind.Pas.Bata Hebel T.10cm


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 5.5440 59,683.20 330,883.66
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.5544 308,550.00 171,060.12
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Hebel T.10cm 1Pc:4Psr m2 9.9000 124,527.35 1,232,820.77
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 284,805.50 569,611.00
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.1088 23,926.95 26,530.20
Jumlah 5,806,062.83

L1264 Septic Tank Kap.2,00M3 (1,00x2,00x1,50M)/bh Dind.Pas.Bata Hebel T.7,5cm


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 5.5440 59,683.20 330,883.66
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.5544 308,550.00 171,060.12
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Hebel T.7,5cm 1Pc:4Psr m2 9.9000 97,730.00 967,527.00
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 270,334.93 540,669.86
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.1088 23,926.95 26,530.20
Jumlah 5,511,827.93

528975646.xls
Page 363 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1265 Septic Tank Kap.2,50M3 (1,00x2,00x1,75M)/bh Dind.Pas.Bataco Semen


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 6.3840 59,683.20 381,017.55
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.6384 308,550.00 196,978.32
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bataco Semen 1Pc:4Psr m2 11.5750 66,214.85 766,436.89
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 253,316.75 506,633.50
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.2768 23,926.95 30,549.93
Jumlah 5,356,773.27

L1266 Septic Tank Kap.2,50M3 (1,00x2,00x1,75M)/bh Dind.Pas.Bata Kampung


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 6.3840 59,683.20 381,017.55
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.6384 308,550.00 196,978.32
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Kampung 1Pc:4Psr m2 11.5750 79,727.75 922,848.71
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 260,613.71 521,227.43
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.2768 23,926.95 30,549.93
Jumlah 5,527,779.02

L1267 Septic Tank Kap.2,50M3 (1,00x2,00x1,75M)/bh Dind.Pas.Bata Kuo Shin


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 6.3840 59,683.20 381,017.55
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.6384 308,550.00 196,978.32
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Kuo Shin 1Pc:4Psr m2 11.5750 91,531.34 1,059,475.26

528975646.xls
Page 364 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 266,987.65 533,975.31
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.2768 23,926.95 30,549.93
Jumlah 5,677,153.45

L1268 Septic Tank Kap.2,50M3 (1,00x2,00x1,75M)/bh Dind.Pas.Bata Press


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 6.3840 59,683.20 381,017.55
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.6384 308,550.00 196,978.32
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Kuo Shin 1Pc:4Psr m2 11.5750 88,940.00 1,029,480.50
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 265,588.33 531,176.66
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.2768 23,926.95 30,549.93
Jumlah 5,644,360.05

L1269 Septic Tank Kap.2,50M3 (1,00x2,00x1,75M)/bh Dind.Pas.Bata Hebel T.10cm


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 6.3840 59,683.20 381,017.55
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.6384 308,550.00 196,978.32
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Hebel T.10cm 1Pc:4Psr m2 11.5750 124,527.35 1,441,404.08
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58

528975646.xls
Page 365 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 284,805.50 569,611.00
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.2768 23,926.95 30,549.93
Jumlah 6,094,717.96

L1270 Septic Tank Kap.2,50M3 (1,00x2,00x1,75M)/bh Dind.Pas.Bata Hebel T.7,5cm


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 6.3840 59,683.20 381,017.55
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.6384 308,550.00 196,978.32
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Hebel T.7,5cm 1Pc:4Psr m2 11.5750 97,730.00 1,131,224.75
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 270,334.93 540,669.86
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.2768 23,926.95 30,549.93
Jumlah 5,755,597.50

L1271 Septic Tank Kap.3,00M3 (1,00x2,00x2,00M)/bh Dind.Pas.Bataco Semen


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 7.2240 59,683.20 431,151.44
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.7224 308,550.00 222,896.52
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bataco Semen 1Pc:4Psr m2 13.3750 66,214.85 885,623.62
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 253,316.75 506,633.50
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.4448 23,926.95 34,569.66
Jumlah 5,556,031.82

528975646.xls
Page 366 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1272 Septic Tank Kap.3,00M3 (1,00x2,00x2,00M)/bh Dind.Pas.Bata Kampung


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 7.2240 59,683.20 431,151.44
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.7224 308,550.00 222,896.52
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Kampung 1Pc:4Psr m2 13.3750 79,727.75 1,066,358.66
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 260,613.71 521,227.43
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.4448 23,926.95 34,569.66
Jumlah 5,751,360.79

L1273 Septic Tank Kap.3,00M3 (1,00x2,00x2,00M)/bh Dind.Pas.Bata Kuo Shin


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 7.2240 59,683.20 431,151.44
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.7224 308,550.00 222,896.52
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Kuo Shin 1Pc:4Psr m2 13.3750 91,531.34 1,224,231.67
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 266,987.65 533,975.31
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.4448 23,926.95 34,569.66
Jumlah 5,921,981.68

L1274 Septic Tank Kap.3,00M3 (1,00x2,00x2,00M)/bh Dind.Pas.Bata Press


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 7.2240 59,683.20 431,151.44
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.7224 308,550.00 222,896.52
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Kuo Shin 1Pc:4Psr m2 13.3750 88,940.00 1,189,572.50

528975646.xls
Page 367 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 265,588.33 531,176.66
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.4448 23,926.95 34,569.66
Jumlah 5,884,523.86

L1275 Septic Tank Kap.3,00M3 (1,00x2,00x2,00M)/bh Dind.Pas.Bata Hebel T.10cm


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 7.2240 59,683.20 431,151.44
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.7224 308,550.00 222,896.52
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Hebel T.10cm 1Pc:4Psr m2 13.3750 124,527.35 1,665,553.31
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 284,805.50 569,611.00
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.4448 23,926.95 34,569.66
Jumlah 6,398,939.01

L1276 Septic Tank Kap.3,00M3 (1,00x2,00x2,00M)/bh Dind.Pas.Bata Hebel T.7,5cm


Pas.Bouwplank m' 16.0000 31,257.17 500,114.67
Galian Tanah m3 7.2240 59,683.20 431,151.44
Pemadatan Tanah m2 3.3600 4,838.00 16,255.68
Urugan Pasir Dasar T.10cm m3 0.7224 308,550.00 222,896.52
Lantai Kerja 1:3:5 Krl T.5cm m2 3.3600 48,072.75 161,524.44
Beton Tulang Lantai T.10cm
Pembesian Polos dia 820 Single kg 16.2503 13,546.25 220,130.63
Bekisting Tepi Praktis m2 1.5200 56,537.70 85,937.30
Beton 1pc:2psr:3Spl m3 0.3360 926,925.00 311,446.80
Pas.Bata Hebel T.7,5cm 1Pc:4Psr m2 13.3750 97,730.00 1,307,138.75
Beton Tulang Ringbalk 10x10cm
Pembesian Polos 4dia10+dia 820 kg 25.2345 13,546.25 341,832.85
Bekisting Praktis m2 2.6800 56,537.70 151,521.04
Beton 1pc:2psr:3Spl m3 0.0720 926,925.00 66,738.60
Beton Tulang Plat Pembagi T.5x50cm
Pembesian Polos dia 820 Single kg 3.4325 13,546.25 46,497.50
Bekisting Praktis m2 1.1025 56,537.70 62,332.81
Beton 1pc:2psr:3Spl m3 0.0325 926,925.00 30,125.06
Beton Tulang Plat Tutup T.10cm
Bekisting Praktis m2 3.5925 56,537.70 203,111.69
Pembesian Polos dia1010+dia 820cm kg 29.1702 13,546.25 395,146.82
Beton 1pc:2psr:3Spl m3 0.2990 926,925.00 277,150.58

528975646.xls
Page 368 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Bak Kontrol Inlet dan Out Let 30x30x30cm bh 2.0000 270,334.93 540,669.86
Sparingsparing 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Man Hole 25% dari Cor Beton Plat ls 1.0000 231,731.25 231,731.25
Pipa Bau dia 1,5" Type D ls 5.0000 28,365.63 141,828.13
Urugan Tanah Kembali m3 1.4448 23,926.95 34,569.66
Jumlah 6,011,583.31

L1277 Resapan Septic Tank Panjang 2,00M/bh


Galian Tanah m3 1.5000 47,853.90 71,780.85
Tempelan Injuk Tepi Galian 5,00M2 T.2,5cm m2 6.5000 22,500.00 146,250.00
Timbunan Pecahan Bata+Genteng T.20cm m3 0.2200 225,000.00 49,500.00
Pas.Injuk Atas Pecahan Bata & Genteng m2 1.2000 22,500.00 27,000.00
Timbunan Koral Beton T.20cm m3 0.2600 225,000.00 58,500.00
Pas.Injuk Atas Koral Beton m2 1.4000 95,707.80 133,990.92
Timbunan Koral Gundu T.20cm m3 0.3000 240,000.00 72,000.00
Pas.Injuk Atas Koral Gundu m2 1.6000 45,000.00 72,000.00
Timbunan Pasir Urug T.20cm m3 0.2000 217,500.00 43,500.00
Pas.Injuk Atas Pasir Urug m2 1.8000 45,000.00 81,000.00
Urugan Tanah T.25cm m3 0.3800 47,853.90 18,184.48
Jumlah 773,706.25

L1278 Resapan Septic Tank Panjang 2,50M/bh


Galian Tanah m3 1.8750 47,853.90 89,726.06
Tempelan Injuk Tepi Galian 5,00M2 T.2,5cm m2 8.1250 22,500.00 182,812.50
Timbunan Pecahan Bata+Genteng T.20cm m3 0.2750 225,000.00 61,875.00
Pas.Injuk Atas Pecahan Bata & Genteng m2 1.5000 22,500.00 33,750.00
Timbunan Koral Beton T.20cm m3 0.3250 225,000.00 73,125.00
Pas.Injuk Atas Koral Beton m2 1.7500 95,707.80 167,488.65
Timbunan Koral Gundu T.20cm m3 0.3750 240,000.00 90,000.00
Pas.Injuk Atas Koral Gundu m2 2.0000 45,000.00 90,000.00
Timbunan Pasir Urug T.20cm m3 0.2500 217,500.00 54,375.00
Pas.Injuk Atas Pasir Urug m2 2.2500 45,000.00 101,250.00
Urugan Tanah T.25cm m3 0.4750 47,853.90 22,730.60
Jumlah 967,132.82

L1279 Resapan Septic Tank Panjang 3,00M/bh


Galian Tanah m3 2.2500 47,853.90 107,671.28
Tempelan Injuk Tepi Galian 5,00M2 T.2,5cm m2 9.7500 22,500.00 219,375.00
Timbunan Pecahan Bata+Genteng T.20cm m3 0.3300 225,000.00 74,250.00
Pas.Injuk Atas Pecahan Bata & Genteng m2 1.8000 22,500.00 40,500.00
Timbunan Koral Beton T.20cm m3 0.3900 225,000.00 87,750.00
Pas.Injuk Atas Koral Beton m2 2.1000 95,707.80 200,986.38
Timbunan Koral Gundu T.20cm m3 0.4500 240,000.00 108,000.00
Pas.Injuk Atas Koral Gundu m2 2.4000 45,000.00 108,000.00
Timbunan Pasir Urug T.20cm m3 0.3000 217,500.00 65,250.00
Pas.Injuk Atas Pasir Urug m2 2.7000 45,000.00 121,500.00
Urugan Tanah T.25cm m3 0.5700 47,853.90 27,276.72
Jumlah 1,160,559.38

L1280 Septic Tank Fibre Glass Bulat kap.1,00M3/bh


Galian Tanah dia 110cm dalam 180cm m3 1.7097 74,453.70 127,293.49
Pemadatan Tanah Dasar Dia 110cm m2 0.9499 4,838.00 4,595.62
Urugan Pasir Dasar T.10cm m3 0.0950 308,550.00 29,309.16
Plat Beton Dasar T.5cm 1Pc:3Psr:5Spl m2 0.9499 48,072.75 45,664.31
Tanki Fibre dia 90x160cm T.5mm bh 1.0000 2,625,000.00 2,625,000.00
Urugan Pasir Keliling T.10cm m3 0.5275 308,550.00 162,760.13
Urugan Pasir Atas 1,10x1,10M T.5cm m3 0.0605 308,550.00 18,667.28
Plat Beton Tulang Praktis Atas T.10 dia 1020cm m2 1.2100 201,496.22 243,810.42
Jumlah 3,257,100.40

L1281 Septic Tank Fibre Glass Bulat kap.1,50M3/bh


Galian Tanah dia 130cm dalam 180cm m3 2.3880 74,453.70 177,795.44
Pemadatan Tanah Dasar dia 130cm m2 1.3266 4,838.00 6,418.09
Urugan Pasir Dasar T.10cm m3 0.1327 308,550.00 40,932.24
Plat Beton Dasar T.5cm 1Pc:3Psr:5Spl m2 1.3266 48,072.75 63,773.31
Tanki Fibre dia 110x160cm T.5mm bh 1.0000 3,750,000.00 3,750,000.00
Urugan Pasir Keliling T.10cm m3 0.6029 308,550.00 186,024.80
Urugan Pasir Atas 1,30x1,30M T.5cm m3 0.0845 308,550.00 26,072.48
Plat Beton Tulang Praktis Atas T.10 dia 1020cm m2 1.6900 201,496.22 340,528.61
Jumlah 4,591,544.96

528975646.xls
Page 369 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

L1282 Septic Tank Fibre Glass Bulat kap.2,00M3/bh


Galian Tanah dia 140cm dalam 200cm m3 3.0772 74,453.70 229,108.93
Pemadatan Tanah Dasar dia 140cm m2 1.5386 4,838.00 7,443.75
Urugan Pasir Dasar T.10cm m3 0.1539 308,550.00 47,473.50
Plat Beton Dasar T.5cm 1Pc:3Psr:5Spl m2 1.5386 48,072.75 73,964.73
Tanki Fibre dia 120x180cm T.5mm bh 1.0000 4,500,000.00 4,500,000.00
Urugan Pasir Keliling T.10cm m3 0.7348 308,550.00 226,722.54
Urugan Pasir Atas 1,40x1,40M T.5cm m3 0.0980 308,550.00 30,237.90
Plat Beton Tulang Praktis Atas T.10 dia 1020cm m2 1.9600 201,496.22 394,932.59
Jumlah 5,509,883.94

L1283 Septic Tank Fibre Glass Bulat kap.2,50M3/bh


Galian Tanah dia 140cm dalam 220cm m3 3.0772 74,453.70 229,108.93
Pemadatan Tanah Dasar dia 140cm m2 1.5386 4,838.00 7,443.75
Urugan Pasir Dasar T.10cm m3 0.1539 308,550.00 47,473.50
Plat Beton Dasar T.5cm 1Pc:3Psr:5Spl m2 1.5386 48,072.75 73,964.73
Tanki Fibre dia 120x200cm T.5mm bh 1.0000 5,625,000.00 5,625,000.00
Urugan Pasir Keliling T.10cm m3 0.8164 308,550.00 251,900.22
Urugan Pasir Atas 1,40x1,40M T.5cm m3 0.0980 308,550.00 30,237.90
Plat Beton Tulang Praktis Atas T.10 dia 1020cm m2 1.9600 201,496.22 394,932.59
Jumlah 6,660,061.62

L1284 Septic Tank Fibre Glass Bulat kap.3,00M3/bh


Galian Tanah dia 150cm dalam 245cm m3 4.3273 74,453.70 322,183.50
Pemadatan Tanah Dasar dia 140cm m2 1.7663 4,838.00 8,545.36
Urugan Pasir Dasar T.10cm m3 0.1766 308,550.00 54,499.19
Plat Beton Dasar T.5cm 1Pc:3Psr:5Spl m2 1.7663 48,072.75 84,910.90
Tanki Fibre dia 130x225cm T.5mm bh 1.0000 6,375,000.00 6,375,000.00
Urugan Pasir Keliling T.10cm m3 0.9891 308,550.00 305,186.81
Urugan Pasir Atas 1,50x1,50M T.5cm m3 0.1125 308,550.00 34,711.88
Plat Beton Tulang Praktis Atas T.10 dia 1020cm m2 2.2500 201,496.22 453,366.49
Jumlah 7,638,404.11

528975646.xls
Page 370 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

PEK.ACCESORIES INSTALASI SANITASI


Lantai1
M1001 Bath Tube Import/bh Type1
Bahan
Bath Tube bh 1.0000 52,500,000.00 52,500,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 53,122,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 53,721,080.00

M1002 Bath Tube Import/bh Type2


Bahan
Bath Tube bh 1.0000 37,500,000.00 37,500,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 38,122,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 38,721,080.00

M1003 Bath Tube Import/bh Type3


Bahan
Bath Tube bh 1.0000 22,500,000.00 22,500,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 23,122,580.00

528975646.xls
Page 371 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 23,721,080.00

M1004 Bath Tube Lokal/bh TOTO Type1


Bahan
Bath Tube bh 1.0000 19,050,000.00 19,050,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 19,672,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 20,271,080.00

M1005 Bath Tube Lokal/bh TOTO Type2


Bahan
Bath Tube bh 1.0000 14,400,000.00 14,400,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 15,022,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 15,621,080.00

M1006 Bath Tube Lokal/bh TOTO Type3


Bahan
Bath Tube bh 1.0000 10,800,000.00 10,800,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 11,422,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 12,021,080.00

M1007 Bath Tube Lokal/bh KIA Type1


Bahan
Bath Tube bh 1.0000 18,750,000.00 18,750,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 19,372,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 19,971,080.00

M1008 Bath Tube Lokal/bh KIA Type2


Bahan
Bath Tube bh 1.0000 14,250,000.00 14,250,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 14,872,580.00

528975646.xls
Page 372 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 15,471,080.00

M1009 Bath Tube Lokal/bh KIA Type3


Bahan
Bath Tube bh 1.0000 10,500,000.00 10,500,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 11,122,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 11,721,080.00

M1010 Bath Tube Lokal/bh INA Type1


Bahan
Bath Tube bh 1.0000 18,000,000.00 18,000,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 18,622,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 19,221,080.00

M1011 Bath Tube Lokal/bh INA Type2


Bahan
Bath Tube bh 1.0000 13,500,000.00 13,500,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 14,122,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 14,721,080.00

M1012 Bath Tube Lokal/bh INA Type3


Bahan
Bath Tube bh 1.0000 9,750,000.00 9,750,000.00
Pas.Bata Dudukan Bawah 1:4 m2 4.0000 88,940.00 355,760.00
Pas.Bata Sisi Luar L 1:4 m2 3.0000 88,940.00 266,820.00
Jumlah.a 10,372,580.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 3.0000 72,000.00 216,000.00
Kep.Tukang ht 0.7500 108,000.00 81,000.00
Mandor ht 0.2500 126,000.00 31,500.00
Jumlah.b 598,500.00
Jumlah.a+b 10,971,080.00

M1013 Bath Shower Import/bh Type1


Bahan
Bath Shower Import bh 1.0000 5,250,000.00 5,250,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 5,251,875.00

528975646.xls
Page 373 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 5,281,275.00

M1014 Bath Shower Import/bh Type2


Bahan
Bath Shower Import bh 1.0000 3,750,000.00 3,750,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 3,751,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 3,781,275.00

M1015 Bath Shower Import/bh Type3


Bahan
Bath Shower Import bh 1.0000 3,000,000.00 3,000,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 3,001,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 3,031,275.00

M1016 Bath Shower Lokal/bh TOTO Type1


Bahan
Bath Shower bh 1.0000 3,088,500.00 3,088,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 3,090,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 3,119,775.00

M1017 Bath Shower Lokal/bh TOTO Type2


Bahan
Bath Shower bh 1.0000 2,997,000.00 2,997,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 2,998,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 3,028,275.00

M1018 Bath Shower Lokal/bh TOTO Type3


Bahan
Bath Shower bh 1.0000 2,304,000.00 2,304,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 2,305,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 2,335,275.00

M1019 Bath Shower Lokal/bh KIA Type1


Bahan
Bath Shower bh 1.0000 3,000,000.00 3,000,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 3,001,875.00

528975646.xls
Page 374 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 3,031,275.00

M1020 Bath Shower Lokal/bh KIA Type2


Bahan
Bath Shower bh 1.0000 2,625,000.00 2,625,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 2,626,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 2,656,275.00

M1021 Bath Shower Lokal/bh KIA Type3


Bahan
Bath Shower bh 1.0000 2,250,000.00 2,250,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 2,251,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 2,281,275.00

M1022 Bath Shower Lokal/bh INA Type1


Bahan
Bath Shower bh 1.0000 2,625,000.00 2,625,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 2,626,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 2,656,275.00

M1023 Bath Shower Lokal/bh INA Type2


Bahan
Bath Shower bh 1.0000 2,250,000.00 2,250,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 2,251,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 2,281,275.00

M1024 Bath Shower Lokal/bh INA Type3


Bahan
Bath Shower bh 1.0000 1,875,000.00 1,875,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 1,876,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 1,906,275.00

528975646.xls
Page 375 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1025 Tempat Sabun Dinding Import/bh Type1


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 300,000.00 300,000.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 300,750.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 479,250.00

M1026 Tempat Sabun Dinding Import/bh Type2


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 225,000.00 225,000.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 225,750.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 404,250.00

M1027 Tempat Sabun Dinding Import/bh Type3


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 150,000.00 150,000.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 150,750.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 329,250.00

M1028 Tempat Sabun Dinding Lokal TOTO/bh Type1


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 195,000.00 195,000.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 195,750.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 374,250.00

M1029 Tempat Sabun Dinding Lokal TOTO/bh Type2


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 63,000.00 63,000.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 63,750.00

528975646.xls
Page 376 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 242,250.00

M1030 Tempat Sabun Dinding Lokal TOTO/bh Type3


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 51,000.00 51,000.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 51,750.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 230,250.00

M1031 Tempat Sabun Dinding Lokal KIA/bh Type1


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 187,500.00 187,500.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 188,250.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 366,750.00

M1032 Tempat Sabun Dinding Lokal KIA/bh Type2


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 75,000.00 75,000.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 75,750.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 254,250.00

M1033 Tempat Sabun Dinding Lokal KIA/bh Type3


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 52,500.00 52,500.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 53,250.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00

528975646.xls
Page 377 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 231,750.00

M1034 Tempat Sabun Dinding Lokal INA/bh Type1


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 150,000.00 150,000.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 150,750.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 329,250.00

M1035 Tempat Sabun Dinding Lokal INA/bh Type2


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 52,500.00 52,500.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 53,250.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 231,750.00

M1036 Tempat Sabun Dinding Lokal INA/bh Type3


Bahan
Tempat Sabun Dinding Import/bh bh 1.0000 37,500.00 37,500.00
Semen Perekat kg 0.1000 7,500.00 750.00
Jumlah.a 38,250.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.2500 108,000.00 27,000.00
Mandor ht 0.0833 126,000.00 10,500.00
Jumlah.b 172,500.00
Alat
Pemotong Keramik m' 1.0000 3,000.00 3,000.00
Pahat Besi bh 0.1000 30,000.00 3,000.00
Jumlah.a+b 216,750.00

M1037 Gantungan Handuk Import Lurus/bh Type1


Bahan
Gantungan Handuk bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 779,400.00

M1038 Gantungan Handuk Import Lurus/bh Type2


Bahan
Gantungan Handuk bh 1.0000 675,000.00 675,000.00
Jumlah.a 675,000.00

528975646.xls
Page 378 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 704,400.00

M1039 Gantungan Handuk Import Lurus/bh Type3


Bahan
Gantungan Handuk bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 629,400.00

M1040 Gantungan Handuk Import Ring/bh Type1


Bahan
Gantungan Handuk bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 554,400.00

M1041 Gantungan Handuk Import Ring/bh Type2


Bahan
Gantungan Handuk bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 479,400.00

M1042 Gantungan Handuk Import Ring/bh Type3


Bahan
Gantungan Handuk bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 404,400.00

M1043 Gantungan Handuk Lokal TOTO Lurus/bh Type1


Bahan
Gantungan Handuk bh 1.0000 693,000.00 693,000.00
Jumlah.a 693,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 722,400.00

M1044 Gantungan Handuk Lokal TOTO Lurus/bh Type2


Bahan
Gantungan Handuk bh 1.0000 567,000.00 567,000.00
Jumlah.a 567,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 596,400.00

528975646.xls
Page 379 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1045 Gantungan Handuk Lokal TOTO Lurus/bh Type3


Bahan
Gantungan Handuk bh 1.0000 468,000.00 468,000.00
Jumlah.a 468,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 497,400.00

M1046 Gantungan Handuk Lokal TOTO Ring/bh Type1


Bahan
Gantungan Handuk bh 1.0000 430,500.00 430,500.00
Jumlah.a 430,500.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 459,900.00

M1047 Gantungan Handuk Lokal TOTO Ring/bh Type2


Bahan
Gantungan Handuk bh 1.0000 402,000.00 402,000.00
Jumlah.a 402,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 431,400.00

M1048 Gantungan Handuk Lokal TOTO Ring/bh Type3


Bahan
Gantungan Handuk bh 1.0000 366,000.00 366,000.00
Jumlah.a 366,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 395,400.00

M1049 Gantungan Handuk Lokal KIA Lurus/bh Type1


Bahan
Gantungan Handuk bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 629,400.00

M1050 Gantungan Handuk Lokal KIA Lurus/bh Type2


Bahan
Gantungan Handuk bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 554,400.00

M1051 Gantungan Handuk Lokal KIA Lurus/bh Type3


Bahan
Gantungan Handuk bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00

528975646.xls
Page 380 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 479,400.00

M1052 Gantungan Handuk Lokal KIA Ring/bh Type1


Bahan
Gantungan Handuk bh 1.0000 412,500.00 412,500.00
Jumlah.a 412,500.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 441,900.00

M1053 Gantungan Handuk Lokal KIA Ring/bh Type2


Bahan
Gantungan Handuk bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 404,400.00

M1054 Gantungan Handuk Lokal KIA Ring/bh Type3


Bahan
Gantungan Handuk bh 1.0000 337,500.00 337,500.00
Jumlah.a 337,500.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 366,900.00

M1055 Gantungan Handuk Lokal INA Lurus/bh Type1


Bahan
Gantungan Handuk bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 554,400.00

M1056 Gantungan Handuk Lokal INA Lurus/bh Type2


Bahan
Gantungan Handuk bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 479,400.00

M1057 Gantungan Handuk Lokal INA Lurus/bh Type3


Bahan
Gantungan Handuk bh 1.0000 412,500.00 412,500.00
Jumlah.a 412,500.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 441,900.00

528975646.xls
Page 381 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1058 Gantungan Handuk Lokal INA Ring/bh Type1


Bahan
Gantungan Handuk bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 404,400.00

M1059 Gantungan Handuk Lokal INA Ring/bh Type2


Bahan
Gantungan Handuk bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 329,400.00

M1060 Gantungan Handuk Lokal INA Ring/bh Type3


Bahan
Gantungan Handuk bh 1.0000 262,500.00 262,500.00
Jumlah.a 262,500.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 291,900.00

M1061 Shower Tray Import/bh Type1


Bahan
Box`Shower bh 1.0000 1,125,000.00 1,125,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 1,347,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 1,649,350.00

M1062 Shower Tray Import/bh Type2


Bahan
Box`Shower bh 1.0000 1,050,000.00 1,050,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 1,272,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 1,574,350.00

M1063 Shower Tray Import/bh Type3


Bahan
Box`Shower bh 1.0000 975,000.00 975,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 1,197,350.00

528975646.xls
Page 382 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 1,499,350.00

M1064 Shower Tray Lokal TOTO/bh Type1


Bahan
Box`Shower bh 1.0000 900,000.00 900,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 1,122,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 1,424,350.00

M1065 Shower Tray Lokal TOTO/bh Type2


Bahan
Box`Shower bh 1.0000 825,000.00 825,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 1,047,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 1,349,350.00

M1066 Shower Tray Lokal TOTO/bh Type3


Bahan
Box`Shower bh 1.0000 750,000.00 750,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 972,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 1,274,350.00

M1067 Shower Tray Lokal KIA/bh Type1


Bahan
Box`Shower bh 1.0000 675,000.00 675,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 897,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 1,199,350.00

M1068 Shower Tray Lokal KIA/bh Type2


Bahan
Box`Shower bh 1.0000 600,000.00 600,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 822,350.00

528975646.xls
Page 383 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 1,124,350.00

M1069 Shower Tray Lokal KIA/bh Type3


Bahan
Box`Shower bh 1.0000 525,000.00 525,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 747,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 1,049,350.00

M1070 Shower Tray Lokal INA/bh Type1


Bahan
Box`Shower bh 1.0000 450,000.00 450,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 672,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 974,350.00

M1071 Shower Tray Lokal INA/bh Type2


Bahan
Box`Shower bh 1.0000 375,000.00 375,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 597,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 899,350.00

M1072 Shower Tray Lokal INA/bh Type3


Bahan
Box`Shower bh 1.0000 300,000.00 300,000.00
Pas.Bata Dudukan Bawah 1Pc:4Psr m2 2.0000 88,940.00 177,880.00
Pas.Bata Tepi L 1Pc:4Psr m2 0.5000 88,940.00 44,470.00
Jumlah.a 522,350.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Jumlah.a+b 824,350.00

M1073 Wall Shower Import /bh Type1


Bahan
Wall Shower bh 1.0000 1,500,000.00 1,500,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 1,501,875.00

528975646.xls
Page 384 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 1,531,275.00

M1074 Wall Shower Import /bh Type2


Bahan
Wall Shower bh 1.0000 1,350,000.00 1,350,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 1,351,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 1,381,275.00

M1075 Wall Shower Import /bh Type3


Bahan
Wall Shower bh 1.0000 1,200,000.00 1,200,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 1,201,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 1,231,275.00

M1076 Wall Shower Lokal TOTO/bh Type1


Bahan
Wall Shower bh 1.0000 1,125,000.00 1,125,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 1,126,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 1,156,275.00

M1077 Wall Shower Lokal TOTO/bh Type2


Bahan
Wall Shower bh 1.0000 1,005,000.00 1,005,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 1,006,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 1,036,275.00

M1078 Wall Shower Lokal TOTO/bh Type3


Bahan
Wall Shower bh 1.0000 750,000.00 750,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 751,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 781,275.00

M1079 Wall Shower Lokal KIA/bh Type1


Bahan
Wall Shower bh 1.0000 675,000.00 675,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 676,875.00

528975646.xls
Page 385 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 706,275.00

M1080 Wall Shower Lokal KIA/bh Type2


Bahan
Wall Shower bh 1.0000 600,000.00 600,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 601,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 631,275.00

M1081 Wall Shower Lokal KIA/bh Type3


Bahan
Wall Shower bh 1.0000 525,000.00 525,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 526,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 556,275.00

M1082 Wall Shower Lokal INA/bh Type1


Bahan
Wall Shower bh 1.0000 487,500.00 487,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 489,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 518,775.00

M1083 Wall Shower Lokal INA/bh Type2


Bahan
Wall Shower bh 1.0000 450,000.00 450,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 451,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 481,275.00

M1084 Wall Shower Lokal INA/bh Type3


Bahan
Wall Shower bh 1.0000 412,500.00 412,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 414,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 443,775.00

M1085 Bak Mandi Fibre Import/bh Type1


Bahan
Bak Fibre bh 1.0000 600,000.00 600,000.00
Pas.Bata Dudukan Bawah 1:4 m2 2.0000 88,940.00 177,880.00
Pas.Bata Sisi Luar L 1:4 m2 2.0000 88,940.00 177,880.00
Jumlah.a 955,760.00

528975646.xls
Page 386 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 320,000.00
Jumlah.a+b 1,275,760.00

M1086 Bak Mandi Fibre Import/bh Type2


Bahan
Bak Fibre bh 1.0000 525,000.00 525,000.00
Pas.Bata Dudukan Bawah 1:4 m2 2.0000 88,940.00 177,880.00
Pas.Bata Sisi Luar L 1:4 m2 2.0000 88,940.00 177,880.00
Jumlah.a 880,760.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 320,000.00
Jumlah.a+b 1,200,760.00

M1087 Bak Mandi Fibre Import/bh Type3


Bahan
Bak Fibre bh 1.0000 450,000.00 450,000.00
Pas.Bata Dudukan Bawah 1:4 m2 2.0000 88,940.00 177,880.00
Pas.Bata Sisi Luar L 1:4 m2 2.0000 88,940.00 177,880.00
Jumlah.a 805,760.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 320,000.00
Jumlah.a+b 1,125,760.00

M1088 Bak Mandi Fibre Lokal/bh Type1


Bahan
Bak Fibre bh 1.0000 375,000.00 375,000.00
Pas.Bata Dudukan Bawah 1:4 m2 2.0000 88,940.00 177,880.00
Pas.Bata Sisi Luar L 1:4 m2 2.0000 88,940.00 177,880.00
Jumlah.a 730,760.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 320,000.00
Jumlah.a+b 1,050,760.00

M1089 Bak Mandi Fibre Lokal/bh Type2


Bahan
Bak Fibre bh 1.0000 300,000.00 300,000.00
Pas.Bata Dudukan Bawah 1:4 m2 2.0000 88,940.00 177,880.00
Pas.Bata Sisi Luar L 1:4 m2 2.0000 88,940.00 177,880.00
Jumlah.a 655,760.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 320,000.00
Jumlah.a+b 975,760.00

M1090 Bak Mandi Fibre Lokal/bh Type3


Bahan
Bak Fibre bh 1.0000 225,000.00 225,000.00
Pas.Bata Dudukan Bawah 1:4 m2 2.0000 88,940.00 177,880.00
Pas.Bata Sisi Luar L 1:4 m2 2.0000 88,940.00 177,880.00
Jumlah.a 580,760.00

528975646.xls
Page 387 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 320,000.00
Jumlah.a+b 900,760.00

M1091 Bak Mandi Pas.Bata Press/bh 60x60cm


Bahan
Pas.Bata Bawah 1:4 m2 0.7200 88,940.00 64,036.80
Pas.Bata Sisi Luar L 1:4 m2 2.0000 88,940.00 177,880.00
Jumlah.a 241,916.80
Tambahan Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 401,916.80

M1092 Bak Mandi Pas.Bata Press/bh 70x70cm


Bahan
Pas.Bata Bawah 1:4 m2 0.9800 88,940.00 87,161.20
Pas.Bata Sisi Luar L 1:4 m2 2.2500 88,940.00 200,115.00
Jumlah.a 287,276.20
Tambahan Upah
Kenek ht 1.1500 90,000.00 103,500.00
Tk.Batu Halus ht 0.5750 90,000.00 51,750.00
Kep.Tukang ht 0.1917 108,000.00 20,700.00
Mandor ht 0.0639 126,000.00 8,050.00
Jumlah.b 184,000.00
Jumlah.a+b 471,276.20

M1093 Bak Mandi Pas.Bata Press/bh 80x80cm


Bahan
Pas.Bata Bawah 1:4 m2 1.2800 88,940.00 113,843.20
Pas.Bata Sisi Luar L 1:4 m2 2.5000 88,940.00 222,350.00
Jumlah.a 336,193.20
Tambahan Upah
Kenek ht 1.3333 90,000.00 119,997.00
Tk.Batu Halus ht 0.6667 90,000.00 59,998.50
Kep.Tukang ht 0.2222 108,000.00 23,999.40
Mandor ht 0.0741 126,000.00 9,333.10
Jumlah.b 213,328.00
Jumlah.a+b 549,521.20

M1094 Kran Tembok Import/bh Type1


Bahan
Kran Tembok bh 1.0000 450,000.00 450,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 451,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 481,275.00

M1095 Kran Tembok Import/bh Type2


Bahan
Kran Tembok bh 1.0000 412,500.00 412,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 414,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 443,775.00

528975646.xls
Page 388 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1096 Kran Tembok Import/bh Type3


Bahan
Kran Tembok bh 1.0000 375,000.00 375,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 376,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 406,275.00

M1097 Kran Tembok Lokal TOTO/bh Type1


Bahan
Kran Tembok bh 1.0000 412,500.00 412,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 414,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 443,775.00

M1098 Kran Tembok Lokal TOTO/bh Type2


Bahan
Kran Tembok bh 1.0000 375,000.00 375,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 376,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 406,275.00

M1099 Kran Tembok Lokal TOTO/bh Type3


Bahan
Kran Tembok bh 1.0000 337,500.00 337,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 339,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 368,775.00

M1100 Kran Tembok Lokal KIA/bh Type1


Bahan
Kran Tembok bh 1.0000 375,000.00 375,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 376,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 406,275.00

M1101 Kran Tembok Lokal KIA/bh Type2


Bahan
Kran Tembok bh 1.0000 337,500.00 337,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 339,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 368,775.00

528975646.xls
Page 389 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1102 Kran Tembok Lokal KIA/bh Type3


Bahan
Kran Tembok bh 1.0000 300,000.00 300,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 301,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 331,275.00

M1103 Kran Tembok Lokal INA/bh Type1


Bahan
Kran Tembok bh 1.0000 337,500.00 337,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 339,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 368,775.00

M1104 Kran Tembok Lokal INA/bh Type2


Bahan
Kran Tembok bh 1.0000 300,000.00 300,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 301,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 331,275.00

M1105 Kran Tembok Lokal INA/bh Type3


Bahan
Kran Tembok bh 1.0000 262,500.00 262,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 264,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 293,775.00

M1106 Floor Drain Import/bh Type1


Bahan
Floor Drain bh 1.0000 375,000.00 375,000.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 378,431.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 538,431.25

M1107 Floor Drain Import/bh Type2


Bahan
Floor Drain bh 1.0000 300,000.00 300,000.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 303,431.25

528975646.xls
Page 390 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 463,431.25

M1108 Floor Drain Import/bh Type3


Bahan
Floor Drain bh 1.0000 262,500.00 262,500.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 265,931.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 425,931.25

M1109 Floor Drain Lokal TOTO/bh Type1


Bahan
Floor Drain bh 1.0000 288,000.00 288,000.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 291,431.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 451,431.25

M1110 Floor Drain Lokal TOTO/bh Type2


Bahan
Floor Drain bh 1.0000 273,000.00 273,000.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 276,431.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 436,431.25

M1111 Floor Drain Lokal TOTO/bh Type3


Bahan
Floor Drain bh 1.0000 219,000.00 219,000.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 222,431.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 382,431.25

M1112 Floor Drain Lokal KIA/bh Type1


Bahan
Floor Drain bh 1.0000 262,500.00 262,500.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 265,931.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 425,931.25

528975646.xls
Page 391 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1113 Floor Drain Lokal KIA/bh Type2


Bahan
Floor Drain bh 1.0000 225,000.00 225,000.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 228,431.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 388,431.25

M1114 Floor Drain Lokal KIA/bh Type3


Bahan
Floor Drain bh 1.0000 187,500.00 187,500.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 190,931.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 350,931.25

M1115 Floor Drain Lokal INA/bh Type1


Bahan
Floor Drain bh 1.0000 225,000.00 225,000.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 228,431.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 388,431.25

M1116 Floor Drain Lokal INA/bh Type2


Bahan
Floor Drain bh 1.0000 187,500.00 187,500.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 190,931.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 350,931.25

M1117 Floor Drain Lokal INA/bh Type3


Bahan
Floor Drain bh 1.0000 150,000.00 150,000.00
Spesi 1Pc:3Psr m3 0.0050 686,250.00 3,431.25
Jumlah.a 153,431.25
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 160,000.00
Jumlah.a+b 313,431.25

M1118 Wastafel Import/bh Type1


Bahan
Wastafel bh 1.0000 7,500,000.00 7,500,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 7,503,750.00

528975646.xls
Page 392 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 7,818,250.00

M1119 Wastafel Import/bh Type2


Bahan
Wastafel bh 1.0000 5,250,000.00 5,250,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 5,253,750.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 5,568,250.00

M1120 Wastafel Import/bh Type3


Bahan
Wastafel bh 1.0000 3,750,000.00 3,750,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 3,753,750.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 4,068,250.00

M1121 Wastafel Lokal TOTO/bh Type1


Bahan
Wastafel bh 1.0000 5,574,000.00 5,574,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 5,577,750.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 5,892,250.00

M1122 Wastafel Lokal TOTO/bh Type2


Bahan
Wastafel bh 1.0000 3,490,500.00 3,490,500.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 3,494,250.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00

528975646.xls
Page 393 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,808,750.00

M1123 Wastafel Lokal TOTO/bh Type3


Bahan
Wastafel bh 1.0000 2,479,500.00 2,479,500.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 2,483,250.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 2,797,750.00

M1124 Wastafel Lokal KIA/bh Type1


Bahan
Wastafel bh 1.0000 5,250,000.00 5,250,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 5,253,750.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 5,568,250.00

M1125 Wastafel Lokal KIA/bh Type2


Bahan
Wastafel bh 1.0000 3,375,000.00 3,375,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 3,378,750.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,693,250.00

M1126 Wastafel Lokal KIA/bh Type3


Bahan
Wastafel bh 1.0000 2,250,000.00 2,250,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 2,253,750.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 2,568,250.00

528975646.xls
Page 394 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1127 Wastafel Lokal INA/bh Type1


Bahan
Wastafel bh 1.0000 4,500,000.00 4,500,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 4,503,750.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 4,818,250.00

M1128 Wastafel Lokal INA/bh Type2


Bahan
Wastafel bh 1.0000 3,000,000.00 3,000,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 3,003,750.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,318,250.00

M1129 Wastafel Lokal INA/bh Type3


Bahan
Wastafel bh 1.0000 1,875,000.00 1,875,000.00
Seal Tape bh 1.0000 3,750.00 3,750.00
Jumlah.a 1,878,750.00
Upah
Kenek ht 2.0000 90,000.00 180,000.00
Tk.Plumbing ht 1.0000 72,000.00 72,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 302,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 2,193,250.00

M1130 Cermin Wastafel Import/bh Type1


Bahan
Kaca Cermin bh 1.0000 1,125,000.00 1,125,000.00
Jumlah.a 1,125,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 115,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 1,252,500.00

M1131 Cermin Wastafel Import/bh Type2


Bahan
Kaca Cermin bh 1.0000 975,000.00 975,000.00
Jumlah.a 975,000.00

528975646.xls
Page 395 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 1,057,500.00

M1132 Cermin Wastafel Import/bh Type3


Bahan
Kaca Cermin bh 1.0000 825,000.00 825,000.00
Jumlah.a 825,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 907,500.00

M1133 Cermin Wastafel Lokal TOTO/bh Type1


Bahan
Kaca Cermin bh 1.0000 840,000.00 840,000.00
Jumlah.a 840,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 922,500.00

M1134 Cermin Wastafel Lokal TOTO/bh Type2


Bahan
Kaca Cermin bh 1.0000 690,000.00 690,000.00
Jumlah.a 690,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 772,500.00

M1135 Cermin Wastafel Lokal TOTO/bh Type3


Bahan
Kaca Cermin bh 1.0000 540,000.00 540,000.00
Jumlah.a 540,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 622,500.00

528975646.xls
Page 396 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1136 Cermin Wastafel Lokal KIA/bh Type1


Bahan
Kaca Cermin bh 1.0000 750,000.00 750,000.00
Jumlah.a 750,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 832,500.00

M1137 Cermin Wastafel Lokal KIA/bh Type2


Bahan
Kaca Cermin bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 682,500.00

M1138 Cermin Wastafel Lokal KIA/bh Type3


Bahan
Kaca Cermin bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 532,500.00

M1139 Cermin Wastafel Lokal INA/bh Type1


Bahan
Kaca Cermin bh 1.0000 600,000.00 600,000.00
Jumlah.a 600,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 682,500.00

M1140 Cermin Wastafel Lokal INA/bh Type2


Bahan
Kaca Cermin bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00

528975646.xls
Page 397 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 532,500.00

M1141 Cermin Wastafel Lokal INA/bh Type3


Bahan
Kaca Cermin bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah
Kenek ht 0.5000 90,000.00 45,000.00
Tk Kayu Halus ht 0.5000 90,000.00 45,000.00
Kep.Tukang ht 0.1667 108,000.00 18,000.00
Mandor ht 0.0556 126,000.00 7,000.00
Jumlah.b 70,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 382,500.00

M1142 Closet Duduk Import/bh Type1


Bahan
Closet Duduk bh 1.0000 9,000,000.00 9,000,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 9,135,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 9,600,500.00

M1143 Closet Duduk Import/bh Type2


Bahan
Closet Duduk bh 1.0000 5,250,000.00 5,250,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 5,385,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 5,850,500.00

M1144 Closet Duduk Import/bh Type3


Bahan
Closet Duduk bh 1.0000 3,750,000.00 3,750,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,885,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 4,350,500.00

M1145 Closet Duduk Lokal TOTO/bh Type1


Bahan
Closet Duduk bh 1.0000 7,680,000.00 7,680,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 7,815,000.00

528975646.xls
Page 398 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 8,280,500.00

M1146 Closet Duduk Lokal TOTO/bh Type2


Bahan
Closet Duduk bh 1.0000 4,500,000.00 4,500,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 4,635,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 5,100,500.00

M1147 Closet Duduk Lokal TOTO/bh Type3


Bahan
Closet Duduk bh 1.0000 2,775,000.00 2,775,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 2,910,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,375,500.00

M1148 Closet Duduk Lokal KIA/bh Type1


Bahan
Closet Duduk bh 1.0000 6,750,000.00 6,750,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 6,885,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 7,350,500.00

M1149 Closet Duduk Lokal KIA/bh Type2


Bahan
Closet Duduk bh 1.0000 3,750,000.00 3,750,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,885,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00

528975646.xls
Page 399 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 4,350,500.00

M1150 Closet Duduk Lokal KIA/bh Type3


Bahan
Closet Duduk bh 1.0000 2,250,000.00 2,250,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 2,385,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 2,850,500.00

M1151 Closet Duduk Lokal INA/bh Type1


Bahan
Closet Duduk bh 1.0000 6,375,000.00 6,375,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 6,510,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 6,975,500.00

M1152 Closet Duduk Lokal INA/bh Type2


Bahan
Closet Duduk bh 1.0000 3,375,000.00 3,375,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,510,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,975,500.00

M1153 Closet Duduk Lokal INA/bh Type3


Bahan
Closet Duduk bh 1.0000 1,875,000.00 1,875,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 2,010,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 2,475,500.00

528975646.xls
Page 400 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1154 Closet Jongkok Lokal TOTO/bh Type1


Bahan
Closet Jongkok bh 1.0000 2,430,000.00 2,430,000.00
Pas.Bata Dudukan 1:4 m3 0.0500 734,183.00 36,709.15
Jumlah.a 2,466,709.15
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 480,000.00
Jumlah.a+b+c 2,946,709.15

M1155 Closet Jongkok Lokal TOTO/bh Type2


Bahan
Closet Jongkok bh 1.0000 408,000.00 408,000.00
Pas.Bata Dudukan 1:4 m3 0.0500 734,183.00 36,709.15
Jumlah.a 444,709.15
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 480,000.00
Jumlah.a+b+c 924,709.15

M1156 Closet Jongkok Lokal TOTO/bh Type3


Bahan
Closet Jongkok bh 1.0000 213,000.00 213,000.00
Pas.Bata Dudukan 1:4 m3 0.0500 734,183.00 36,709.15
Jumlah.a 249,709.15
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 480,000.00
Jumlah.a+b+c 729,709.15

M1157 Closet Jongkok Lokal KIA/bh Type1


Bahan
Closet Jongkok bh 1.0000 525,000.00 525,000.00
Pas.Bata Dudukan 1:4 m3 0.0500 734,183.00 36,709.15
Jumlah.a 561,709.15
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 480,000.00
Jumlah.a+b+c 1,041,709.15

M1158 Closet Jongkok Lokal KIA/bh Type2


Bahan
Closet Jongkok bh 1.0000 375,000.00 375,000.00
Pas.Bata Dudukan 1:4 m3 0.0500 734,183.00 36,709.15
Jumlah.a 411,709.15
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 480,000.00
Jumlah.a+b+c 891,709.15

M1159 Closet Jongkok Lokal KIA/bh Type3


Bahan
Closet Jongkok bh 1.0000 187,500.00 187,500.00
Pas.Bata Dudukan 1:4 m3 0.0500 734,183.00 36,709.15
Jumlah.a 224,209.15
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00

528975646.xls
Page 401 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Jumlah.b 480,000.00
Jumlah.a+b+c 704,209.15

M1160 Closet Jongkok Lokal INA/bh Type1


Bahan
Closet Jongkok bh 1.0000 450,000.00 450,000.00
Pas.Bata Dudukan 1:4 m3 0.0500 734,183.00 36,709.15
Jumlah.a 486,709.15
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 480,000.00
Jumlah.a+b+c 966,709.15

M1161 Closet Jongkok Lokal INA/bh Type2


Bahan
Closet Jongkok bh 1.0000 300,000.00 300,000.00
Pas.Bata Dudukan 1:4 m3 0.0500 734,183.00 36,709.15
Jumlah.a 336,709.15
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 480,000.00
Jumlah.a+b+c 816,709.15

M1162 Closet Jongkok Lokal INA/bh Type3


Bahan
Closet Jongkok bh 1.0000 150,000.00 150,000.00
Pas.Bata Dudukan 1:4 m3 0.0500 734,183.00 36,709.15
Jumlah.a 186,709.15
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 480,000.00
Jumlah.a+b+c 666,709.15

M1163 Bidet Import/bh Type1


Bahan
Closet Duduk bh 1.0000 6,750,000.00 6,750,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 6,885,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 7,350,500.00

M1164 Bidet Import/bh Type2


Bahan
Closet Duduk bh 1.0000 5,250,000.00 5,250,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 5,385,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 5,850,500.00

M1165 Bidet Import/bh Type3


Bahan

528975646.xls
Page 402 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Closet Duduk bh 1.0000 3,750,000.00 3,750,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,885,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 4,350,500.00

M1166 Bidet Lokal TOTO/bh Type1


Bahan
Closet Duduk bh 1.0000 3,696,000.00 3,696,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,831,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 183,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 4,026,500.00

M1167 Bidet Lokal TOTO/bh Type2


Bahan
Closet Duduk bh 1.0000 3,453,000.00 3,453,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,588,000.00

528975646.xls
Page 403 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 4,053,500.00

M1168 Bidet Lokal TOTO/bh Type3


Bahan
Closet Duduk bh 1.0000 2,995,500.00 2,995,500.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,130,500.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 183,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,326,000.00

M1169 Bidet Lokal KIA/bh Type1


Bahan
Closet Duduk bh 1.0000 3,750,000.00 3,750,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,885,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 4,350,500.00

M1170 Bidet Lokal KIA/bh Type2


Bahan
Closet Duduk bh 1.0000 3,375,000.00 3,375,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,510,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,975,500.00

M1171 Bidet Lokal KIA/bh Type3


Bahan
Closet Duduk bh 1.0000 3,000,000.00 3,000,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,135,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00

528975646.xls
Page 404 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,600,500.00

M1172 Bidet Lokal INA/bh Type1


Bahan
Closet Duduk bh 1.0000 3,375,000.00 3,375,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,510,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,975,500.00

M1173 Bidet Lokal INA/bh Type2


Bahan
Closet Duduk bh 1.0000 3,000,000.00 3,000,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 3,135,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,600,500.00

M1174 Bidet Lokal INA/bh Type3


Bahan
Closet Duduk bh 1.0000 2,625,000.00 2,625,000.00
Papan Dudukan m3 0.0225 6,000,000.00 135,000.00
Jumlah.a 2,760,000.00
Upah
Kenek ht 3.0000 90,000.00 270,000.00
Tk.Plumbing ht 1.5000 72,000.00 108,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 453,000.00
Alat
Bor Listrik hk 0.2500 50,000.00 12,500.00
Jumlah.c 12,500.00
Jumlah.a+b+c 3,225,500.00

M1175 Jet Washer Import/bh Type1


Bahan
Jet Washer bh 1.0000 750,000.00 750,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 751,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 781,275.00

M1176 Jet Washer Import/bh Type2


Bahan
Jet Washer bh 1.0000 600,000.00 600,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 601,875.00

528975646.xls
Page 405 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 631,275.00

M1177 Jet Washer Import/bh Type3


Bahan
Jet Washer bh 1.0000 450,000.00 450,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 451,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 481,275.00

M1178 Jet Washer Lokal TOTO/bh Type1


Bahan
Jet Washer bh 1.0000 414,000.00 414,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 415,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 445,275.00

M1179 Jet Washer Lokal TOTO/bh Type2


Bahan
Jet Washer bh 1.0000 349,500.00 349,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 351,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 380,775.00

M1180 Jet Washer Lokal TOTO/bh Type3


Bahan
Jet Washer bh 1.0000 309,000.00 309,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 310,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 340,275.00

M1181 Jet Washer Lokal KIA/bh Type1


Bahan
Jet Washer bh 1.0000 375,000.00 375,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 376,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 406,275.00

M1182 Jet Washer Lokal KIA/bh Type2


Bahan
Jet Washer bh 1.0000 337,500.00 337,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 339,375.00

528975646.xls
Page 406 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 368,775.00

M1183 Jet Washer Lokal KIA/bh Type3


Bahan
Jet Washer bh 1.0000 300,000.00 300,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 301,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 331,275.00

M1184 Jet Washer Lokal INA/bh Type1


Bahan
Jet Washer bh 1.0000 337,500.00 337,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 339,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 368,775.00

M1185 Jet Washer Lokal INA/bh Type2


Bahan
Jet Washer bh 1.0000 300,000.00 300,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 301,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 331,275.00

M1186 Jet Washer Lokal INA/bh Type3


Bahan
Jet Washer bh 1.0000 262,500.00 262,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 264,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 293,775.00

M1187 Tempat Tissue Import/bh Type1


Bahan
Tempat Tissue bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 402,050.00

M1188 Tempat Tissue Import/bh Type2


Bahan
Tempat Tissue bh 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00

528975646.xls
Page 407 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 252,050.00

M1189 Tempat Tissue Import/bh Type3


Bahan
Tempat Tissue bh 1.0000 150,000.00 150,000.00
Jumlah.a 150,000.00
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 177,050.00

M1190 Tempat Tissue Lokal Toto/bh Type1


Bahan
Tempat Tissue bh 1.0000 223,500.00 223,500.00
Jumlah.a 223,500.00
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 250,550.00

M1191 Tempat Tissue Lokal Toto/bh Type2


Bahan
Tempat Tissue bh 1.0000 178,500.00 178,500.00
Jumlah.a 178,500.00
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 205,550.00

M1192 Tempat Tissue Lokal Toto/bh Type3


Bahan
Tempat Tissue bh 1.0000 81,000.00 81,000.00
Jumlah.a 81,000.00
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 108,050.00

M1193 Tempat Tissue Lokal KIA/bh Type1


Bahan
Tempat Tissue bh 1.0000 187,500.00 187,500.00
Jumlah.a 187,500.00

528975646.xls
Page 408 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 214,550.00

M1194 Tempat Tissue Lokal KIA/bh Type2


Bahan
Tempat Tissue bh 1.0000 150,000.00 150,000.00
Jumlah.a 150,000.00
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 177,050.00

M1195 Tempat Tissue Lokal KIA/bh Type3


Bahan
Tempat Tissue bh 1.0000 75,000.00 75,000.00
Jumlah.a 75,000.00
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 102,050.00

M1196 Tempat Tissue Lokal INA/bh Type1


Bahan
Tempat Tissue bh 1.0000 150,000.00 150,000.00
Jumlah.a 150,000.00
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 177,050.00

M1197 Tempat Tissue Lokal INA/bh Type2


Bahan
Tempat Tissue bh 1.0000 112,500.00 112,500.00
Jumlah.a 112,500.00
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 139,550.00

M1198 Tempat Tissue Lokal INA/bh Type3


Bahan
Tempat Tissue bh 1.0000 52,500.00 52,500.00
Jumlah.a 52,500.00

528975646.xls
Page 409 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga
Upah
Tk.Plumbing ht 0.1500 72,000.00 10,800.00
Kep.Tukang ht 0.0750 108,000.00 8,100.00
Mandor ht 0.0250 126,000.00 3,150.00
Jumlah.b 22,050.00
Alat
Bor Listrik hk 0.1000 50,000.00 5,000.00
Jumlah.c 5,000.00
Jumlah.a+b 79,550.00

M1199 Pantry Zink Import/bh 2Lubang 2Sayap


Bahan
Pantry Zink Import bh 1.0000 525,000.00 525,000.00
Jumlah.a 525,000.00
Upah
Kenek ht 1.7500 90,000.00 157,500.00
Tk.Batu Halus ht 1.7500 90,000.00 157,500.00
Kep.Tukang ht 0.5833 108,000.00 63,000.00
Mandor ht 0.1944 126,000.00 24,500.00
Jumlah.b 402,500.00
Jumlah.a+b 927,500.00

M1200 Pantry Zink Import/bh 2Lubang 1Sayap


Bahan
Pantry Zink Import bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah
Kenek ht 1.5000 90,000.00 135,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 345,000.00
Jumlah.a+b 795,000.00

M1201 Pantry Zink Import/bh 1Lubang 2Sayap


Bahan
Pantry Zink Import bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah
Kenek ht 1.2500 90,000.00 112,500.00
Tk.Batu Halus ht 1.2500 90,000.00 112,500.00
Kep.Tukang ht 0.4167 108,000.00 45,000.00
Mandor ht 0.1389 126,000.00 17,500.00
Jumlah.b 287,500.00
Jumlah.a+b 662,500.00

M1202 Pantry Zink Import/bh 1Lubang 1Sayap


Bahan
Pantry Zink Import bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 230,000.00
Jumlah.a+b 530,000.00

M1203 Pantry Zink Lokal Diethelm/bh 2Lubang 2Sayap


Bahan
Pantry Zink Import bh 1.0000 450,000.00 450,000.00
Jumlah.a 450,000.00
Upah
Kenek ht 1.7500 90,000.00 157,500.00
Tk.Batu Halus ht 1.7500 90,000.00 157,500.00
Kep.Tukang ht 0.5833 108,000.00 63,000.00
Mandor ht 0.1944 126,000.00 24,500.00
Jumlah.b 402,500.00
Jumlah.a+b 852,500.00

528975646.xls
Page 410 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1204 Pantry Zink Lokal Diethelm/bh 2Lubang 1Sayap


Bahan
Pantry Zink Import bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah
Kenek ht 1.5000 90,000.00 135,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 345,000.00
Jumlah.a+b 720,000.00

M1205 Pantry Zink Lokal Diethelm/bh 1Lubang 2Sayap


Bahan
Pantry Zink Import bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah
Kenek ht 1.2500 90,000.00 112,500.00
Tk.Batu Halus ht 1.2500 90,000.00 112,500.00
Kep.Tukang ht 0.4167 108,000.00 45,000.00
Mandor ht 0.1389 126,000.00 17,500.00
Jumlah.b 287,500.00
Jumlah.a+b 587,500.00

M1206 Pantry Zink Lokal Diethelm/bh 1Lubang 1Sayap


Bahan
Pantry Zink Import bh 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 230,000.00
Jumlah.a+b 455,000.00

M1207 Pantry Zink Lokal Ariston/bh 2Lubang 2Sayap


Bahan
Pantry Zink Import bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah
Kenek ht 1.7500 90,000.00 157,500.00
Tk.Batu Halus ht 1.7500 90,000.00 157,500.00
Kep.Tukang ht 0.5833 108,000.00 63,000.00
Mandor ht 0.1944 126,000.00 24,500.00
Jumlah.b 402,500.00
Jumlah.a+b 777,500.00

M1208 Pantry Zink Lokal Ariston/bh 2Lubang 1Sayap


Bahan
Pantry Zink Import bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah
Kenek ht 1.5000 90,000.00 135,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 345,000.00
Jumlah.a+b 645,000.00

M1209 Pantry Zink Lokal Ariston/bh 1Lubang 2Sayap


Bahan
Pantry Zink Import bh 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah
Kenek ht 1.2500 90,000.00 112,500.00
Tk.Batu Halus ht 1.2500 90,000.00 112,500.00
Kep.Tukang ht 0.4167 108,000.00 45,000.00
Mandor ht 0.1389 126,000.00 17,500.00
Jumlah.b 287,500.00
Jumlah.a+b 512,500.00

528975646.xls
Page 411 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1210 Pantry Zink Lokal Ariston/bh 1Lubang 1Sayap


Bahan
Pantry Zink Import bh 1.0000 150,000.00 150,000.00
Jumlah.a 150,000.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 230,000.00
Jumlah.a+b 380,000.00

M1211 Pantry Zink Lokal Meiwa/bh 2Lubang 2Sayap


Bahan
Pantry Zink Import bh 1.0000 375,000.00 375,000.00
Jumlah.a 375,000.00
Upah
Kenek ht 1.7500 90,000.00 157,500.00
Tk.Batu Halus ht 1.7500 90,000.00 157,500.00
Kep.Tukang ht 0.5833 108,000.00 63,000.00
Mandor ht 0.1944 126,000.00 24,500.00
Jumlah.b 402,500.00
Jumlah.a+b 777,500.00

M1212 Pantry Zink Lokal Meiwa/bh 2Lubang 1Sayap


Bahan
Pantry Zink Import bh 1.0000 300,000.00 300,000.00
Jumlah.a 300,000.00
Upah
Kenek ht 1.5000 90,000.00 135,000.00
Tk.Batu Halus ht 1.5000 90,000.00 135,000.00
Kep.Tukang ht 0.5000 108,000.00 54,000.00
Mandor ht 0.1667 126,000.00 21,000.00
Jumlah.b 345,000.00
Jumlah.a+b 645,000.00

M1213 Pantry Zink Lokal Meiwa/bh 1Lubang 2Sayap


Bahan
Pantry Zink Import bh 1.0000 225,000.00 225,000.00
Jumlah.a 225,000.00
Upah
Kenek ht 1.2500 90,000.00 112,500.00
Tk.Batu Halus ht 1.2500 90,000.00 112,500.00
Kep.Tukang ht 0.4167 108,000.00 45,000.00
Mandor ht 0.1389 126,000.00 17,500.00
Jumlah.b 287,500.00
Jumlah.a+b 512,500.00

M1214 Pantry Zink Lokal Meiwa/bh 1Lubang 1Sayap


Bahan
Pantry Zink Import bh 1.0000 112,500.00 112,500.00
Jumlah.a 112,500.00
Upah
Kenek ht 1.0000 90,000.00 90,000.00
Tk.Batu Halus ht 1.0000 90,000.00 90,000.00
Kep.Tukang ht 0.3333 108,000.00 36,000.00
Mandor ht 0.1111 126,000.00 14,000.00
Jumlah.b 230,000.00
Jumlah.a+b 342,500.00

M1215 Kran Zink Import/bh Type1


Bahan
Jet Washer bh 1.0000 750,000.00 750,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 751,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 781,275.00

528975646.xls
Page 412 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1216 Kran Zink Import/bh Type2


Bahan
Jet Washer bh 1.0000 675,000.00 675,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 676,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 706,275.00

M1217 Kran Zink Import/bh Type3


Bahan
Jet Washer bh 1.0000 600,000.00 600,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 601,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 631,275.00

M1218 Kran Zink Lokal TOTO/bh Type1


Bahan
Jet Washer bh 1.0000 600,000.00 600,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 601,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 631,275.00

M1219 Kran Zink Lokal TOTO/bh Type2


Bahan
Jet Washer bh 1.0000 525,000.00 525,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 526,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 556,275.00

M1220 Kran Zink Lokal TOTO/bh Type3


Bahan
Jet Washer bh 1.0000 450,000.00 450,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 451,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 481,275.00

M1221 Kran Zink Lokal KIA/bh Type1


Bahan
Jet Washer bh 1.0000 450,000.00 450,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 451,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 481,275.00

528975646.xls
Page 413 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1222 Kran Zink Lokal KIA/bh Type2


Bahan
Jet Washer bh 1.0000 375,000.00 375,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 376,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 406,275.00

M1223 Kran Zink Lokal KIA/bh Type3


Bahan
Jet Washer bh 1.0000 300,000.00 300,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 301,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 331,275.00

M1224 Kran Zink Lokal INA/bh Type1


Bahan
Jet Washer bh 1.0000 300,000.00 300,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 301,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 331,275.00

M1225 Kran Zink Lokal INA/bh Type2


Bahan
Jet Washer bh 1.0000 225,000.00 225,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 226,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 256,275.00

M1226 Kran Zink Lokal INA/bh Type3


Bahan
Jet Washer bh 1.0000 150,000.00 150,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 151,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 181,275.00

M1227 Kran Taman Import/bh Type1


Bahan
Kran Tembok bh 1.0000 450,000.00 450,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 451,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 481,275.00

528975646.xls
Page 414 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1228 Kran Taman Import/bh Type2


Bahan
Kran Tembok bh 1.0000 375,000.00 375,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 376,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 406,275.00

M1229 Kran Taman Import/bh Type3


Bahan
Kran Tembok bh 1.0000 300,000.00 300,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 301,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 331,275.00

M1230 Kran Taman Lokal TOTO/bh Type1


Bahan
Kran Tembok bh 1.0000 375,000.00 375,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 376,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 406,275.00

M1231 Kran Taman Lokal TOTO/bh Type2


Bahan
Kran Tembok bh 1.0000 300,000.00 300,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 301,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 331,275.00

M1232 Kran Taman Lokal TOTO/bh Type3


Bahan
Kran Tembok bh 1.0000 225,000.00 225,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 226,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 256,275.00

M1233 Kran Taman Lokal KIA/bh Type1


Bahan
Kran Tembok bh 1.0000 300,000.00 300,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 301,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 331,275.00

528975646.xls
Page 415 of 374

ID L1237 Bak Kontrol 20x20x20cm/bh 1Pc:4Psr dgn Bata Press Keterangan : sel dengan format ini bisa DIEDIT
Klik & pilih sel kuning di atas untuk melihat AHS

ID Analisa Harga Satuan Pekerjaan Satuan Koefisien Harga Satuan Jumlah Harga

M1234 Kran Taman Lokal KIA/bh Type2


Bahan
Kran Tembok bh 1.0000 225,000.00 225,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 226,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 256,275.00

M1235 Kran Taman Lokal KIA/bh Type3


Bahan
Kran Tembok bh 1.0000 187,500.00 187,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 189,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 218,775.00

M1236 Kran Taman Lokal INA/bh Type1


Bahan
Kran Tembok bh 1.0000 225,000.00 225,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 226,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 256,275.00

M1237 Kran Taman Lokal INA/bh Type2


Bahan
Kran Tembok bh 1.0000 187,500.00 187,500.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 189,375.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00
Jumlah.a+b 218,775.00

M1238 Kran Taman Lokal INA/bh Type3


Bahan
Kran Tembok bh 1.0000 150,000.00 150,000.00
Seal Tape bh 0.5000 3,750.00 1,875.00
Jumlah.a 151,875.00
Upah
Tk.Plumbing ht 0.2000 72,000.00 14,400.00
Kep.Tukang ht 0.1000 108,000.00 10,800.00
Mandor ht 0.0333 126,000.00 4,200.00
Jumlah.b 29,400.00

528975646.xls
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK PEMBANGUNAN MESJID JAMI MIFTAHUL FALAH
KECAMATAN BATUJAJAR

No PEKERJAAN BAHAN UPAH ALAT TOTAL


A PEK.PONDASI 32,118,720.55 21,541,157.01 4,311,100.42 57,970,977.97
B PEK.STRUKTUR 181,681,169.94 53,580,365.71 16,602,108.67 271,670,853.70
C PEK.PAS.DINDING - - - -
D PEK.BETON PRAKTIS - - - -
E PEK.RANGKA & PENUTUP ATAP - - - 65,725,451.98
F PEK.PELAPIS DINDING - - - -
G PEK.PENUTUP PLAFOND - - - -
H PEK.PELAPIS LANTAI - - - -
I PEK.PINTU, JENDELA & KACA - - - -
J PEK.ENGSEL & KUNCI - - - -
K PEK.PENGECATAN - - - -
L PEK.INSTALASI SANITASI - - - -
M PEK.ACCESSORIES INST.SANITAIR - - - -
N PEK.INSTALASI LISTRIK - - - -
O PEK.LUAR & HALAMAN - - - -
P PEK.LAIN-LAIN - - - -
1 SUB TOTAL 1 213,799,890.49 75,121,522.72 20,913,209.08 395,367,283.65
2 JASA KONTRAKTOR (10% X 1) 21,379,989.05 7,512,152.27 2,091,320.91 39,536,728.36
3 SUB TOTAL 2 ( 1 + 2 ) 235,179,879.54 82,633,674.99 23,004,529.99 434,904,012.01
4 PPn ( 10% x 3 ) 23,517,987.95 8,263,367.50 2,300,453.00 43,490,401.20
GRAND TOTAL ( 3 + 4 ) 258,697,867.49 90,897,042.49 25,304,982.99 478,394,413.21
KEMBALI KE RAB

1. Anda cukup mengisi kolom No ID dan Volume, lainnya akan terisi otomatis
2. Font Warna Hitam Tebal diisi manual, untuk Judul dan keterangan
3. Anda bisa menghapus/menyisipkan baris jika diperlukan, jangan lupa copy rumus dari sel di atasnya
4. Abjad pada No ID menunjukkan KELOMPOK PEKERJAAN, angka setelah abjad menunjukkan LANTAI, angka sesuda

Harga S
No No ID Pekerjaan Volume Satuan Bahan
Rp
A PEKERJAAN PONDASI
Pekerjaan Bowplank, Tanah & Pasangan Batu Kali
1 A1010 Galian Tanah Ex.Dipadatkan Dalam Max 1,50M/m3 100.00 m3 -
2 A1003 Galian Tanah Lunak Dalam Max 1,00M/m3 17.80 m3 -
3 A1005 Galian Tanah Lunak Dalam Max 2,00M/m3 13.00 m3 -

Diisi manual, untuk judul/sub judul/keterangan TIDAK PERLU DIISI (AK

CUKUP INI SAJA YANG DIISI (MANUAL)

KETERANGAN No ID

A 1010
A
No Urut B
C
D
E
F
Kelompok Pekerjaan G
H
Contoh : I
M1002 J
M = Kelompok Pekerjaan Asesories Sanitair, no urut 1002 K
L
M
Daftar Lengkap No ID bisa dilihat di bawah ini ! N
(letakkan pointer mouse pada sel kuning, klik panah di samping utk memilih) O
P
M1001 Bath Tube Import/bh Type1

TIPS-TIPS

Cara Mencari Cepat Pekerjaan dalam Analisa Harga Satuan (AHS)


Terkadang kita ingin merubah nilai koefisien sebuah pekerjaan dalam Analisa Harga Satuan.
Jika kita mencari AHS satu persatu, tentu sangat tidak efisien karena dalam file ini terdapat 4000-an AHS.
Nah, ada cara cepat untuk mencari AHS yang kita inginkan, yaitu :
1. Masuk ke sheet AHS
2. Tekan tombol ctrl+F pada keyboard, akan muncul form Find and Replace seperti di samping ini.
3. Dalam form Find what : tuliskan No ID
4. Tekan enter atau klik Find Next.
5. Ketemu sudah......, sekarang AHS yang Anda cari sudah ada di depan mata.
an LANTAI, angka sesudahnya nomer urut

Harga Satuan Jumlah Harga


Upah Alat Subtotal Bahan Upah Alat Total Bobot %
Rp Rp Rp Rp Rp Rp Rp

50,590.27 375.00 50,965.27 - 5,059,026.67 37,500.00 5,096,526.67 4.59%


25,906.40 375.00 26,281.40 - 461,133.92 6,675.00 467,808.92 0.42%
40,477.87 375.00 40,852.87 - 526,212.27 4,875.00 531,087.27 0.48%

TIDAK PERLU DIISI (AKAN TERISI & MENGHITUNG OTOMATIS)

PEK.PONDASI
PEK.STRUKTUR
PEK.PAS.DINDING
PEK.BETON PRAKTIS
PEK.RANGKA & PENUTUP ATAP
PEK.PELAPIS DINDING
PEK.PENUTUP PLAFOND
PEK.PELAPIS LANTAI
PEK.PINTU, JENDELA & KACA
PEK.ENGSEL & KUNCI
PEK.PENGECATAN
PEK.INSTALASI SANITASI
PEK.ACCESSORIES INST.SANITAIR
PEK.INSTALASI LISTRIK
PEK.LUAR & HALAMAN
PEK.LAIN-LAIN

t 4000-an AHS.
Halo kontraktor gedung, bangunan sipil, arsitektur, interior & developer property….

Sesaat Lagi Anda Akan Bisa Mengendalikan Biay


Proyek Dengan Lebih Baik, Menghemat Pengeluar
Hingga 80%, Mencegah Over Budget Sekaligus
Meningkatkan Profit Hingga 25%
Salam proyek,

Sebelum membaca sampai selesai, coba Anda ingat kembali, pernahkan Anda Mengalami Situa
Ketika Anda:

* BINGUNG karena PROFIT PROYEK sangat tipis bahkan RUGI meskipun selesai tepat waktu
* STRESS karena CASHFLOW PROYEK yang berantakan?
* FRUSTRASI karena banyak pemakaian material & pembayaran tukang yang tidak terkontrol s
bengkak dari RAB?
* TIDAK PUNYA WAKTU mengurusi administrasi keuangan proyek dengan nota-nota belanja y
berceceran?

Atau mungkin Anda pernah mendapati:

* Nilai kontrak proyek besar, tapi Cuma Dapat Capeknya.


* Profit proyek besar, tapi Pembayarannya Nyangkut Sulit Ditagih
* Pusing dengan tagihan-tagihan supplier karena Tidak Ada Manajemen Hutang Yang Baik

Dan hal-hal buruk lainnya yang sering banget terjadi di proyek-proyek Anda…

Jika Anda Pernah Atau Sedang Mengalami Hal Tersebut di Atas, Anda Sangat Beruntung Karena Sesa
Akan Mendapatkan Solusinya

Sahabatku para kontraktor & developer….

Kita semua tahu bahwa kesuksesan sebuah proyek (Tepat Waktu, Kualitas Sesuai Spek & Menguntung
sangat bergantung pada:
Kita semua tahu bahwa kesuksesan sebuah proyek (Tepat Waktu, Kualitas Sesuai Spek & Menguntung
sangat bergantung pada:

1. FASE PERENCANAAN
Sebuah proyek akan untung atau rugi sudah bisa diprediksi dari awal, bahkan ketika proyek tersebut be
berjalan. Dimulai dari menghitung RAB secara cermat. Termasuk biaya-biaya overhead diluar biaya lang
(bahan/material, tukang, alat).

Sayangnya, banyak banget kontraktor BONEK, modal nekat. Asal hajar aja, mau menerima sebuah pro
hanya karena nilai kontraknya besar. Padahal belum dianalisa secara mendalam, spek yang diminta sep
apa. Apakah RAB-nya menguntungkan atau tidak.

Jika pada perencanaan saja sudah kelihatan untungnya tipis, atau bahkan rugi, lalu ngapain proyek ters
diambil? Tapi ini justru yang banyak terjadi. Bagaimana dengan Anda?

2. FASE PELAKSANAAN
Katakanlah fase perencanaan sudah dilakukan dengan sangat baik. Di atas kertas, proyek yang AKAN
DIKERJAKAN bakal untung besar. Apakah nanti ketika proyek selesai, PROFIT yang didapat betul-betu
sesuai dengan hitungan awal? BELUM TENTU.

Tergantung bagaimana Anda MENGONTROL semua pos-pos pengeluaran supaya bisa sesuai dengan R
syukur-syukur malah di bawahnya. Namanya proyek, selalu identik dengan pengeluaran. Belanja materi
bayar tukang, biaya operasional dan seterusnya. Belum lagi biaya-biaya tak terduga yang tidak diangga
RAB...

Yang sering banget terjadi adalah, banyak banget pengeluaran yang jebol melebihi anggaran karena ti
PENGENDALIAN BIAYA.

Kebanyakan kontraktor bisa menyelesaikan proyek tepat waktu & kualitas sesuai kontrak. Artinya sudah
PENGENDALIAN WAKTU & MUTU yang bagus. Tapi giliran PENGENDALIAN BIAYA, kebanyakan mer
lemah. Apakah Anda juga begitu?

Rekan-rekan kontraktor & developer yang saya hormati….

Saya Ahadi Abdul, ST

Lebih dari 15 tahun terjun di bidang konstruksi & property, saya banyak banget menemui hal-hal di at
Lebih dari 15 tahun terjun di bidang konstruksi & property, saya banyak banget menemui hal-hal di at
yang saya alami sendiri, maupun pengalaman teman-teman sesama kontraktor.

Sebagai civil engineer profesional, saya pernah di posisi cost estimator dengan tugas menghitung &
menganalisa RAB. Saya juga pernah menjadi project manager, proyek yang saya pimpin waktu itu adala
infrastruktur jalan raya & pendukungnya dengan total anak buah ratusan orang.

Sebelum saya membuka usaha kontraktor & developer property saya sendiri, posisi terakhir sebagai pro
adalah di salah satu BUMN Karya terbesar. Proyek yang terakhir saya tangani adalah kawasan peruma
ratusan hektar senilai ratusan milyar. Tugas & tanggung jawab saya adalah PENGENDALIAN BIAYA.
Memastikan seluruh biaya tidak boleh melebihi yang sudah dianggarkan di awal, sehingga PROFIT peru
bisa tetap terjaga di angka yang sudah direncanakan.

Pada proyek tersebut, tugas saya termasuk menangani procurement & logistik proyek. Ada lebih dari 7
kontraktor yang saya pegang. Kebanyakan sub kontraktor ini adalah kontraktor kecil dan menengah. Me
mengerjakan bangunan rumah, jalan, drainase, dinding turap penahan tanah, pagar dan sebagainya. De
nilai kontrak pekerjaan ratusan juta sampai dengan sekitar 5 milyar. Setiap tahun saya bisa menerbitkan
dengan 200 kontrak untuk pekerjaan-pekerjaan tersebut.

Nah, di sinilah saya melihat, mana kontraktor yang baik dan mana yang ceroboh.

Jadi, diantara kontraktor-kontraktor itu ada yang dapat profit yang bagus, tapi tidak sedikit juga yang pro
tipis. Kok bisa? Padahal pekerjaan yang dikerjakan sama, spek sama, RAB juga sama.

Jawabannya, lagi-lagi ada di PENGENDALIAN BIAYA. Kontraktor yang bisa MENGENDALIKAN BIAYA
dengan baik, ujung-ujungnya, bisa menekan cost sehingga efisien dan profit terjaga tanpa harus menu
kualitas pekerjaan.

Kunci dari PENGENDALIAN BIAYA adalah manajemen keuangan yang baik. Yang saya lihat, kebanyak
kontraktor paling malas untuk urusan manajemen keuangan.

Tentu beda dengan kontraktor besar, sudah ada divisi keuangan yang khusus mengurusi manajemen
keuangan. Dan ada juga divisi khusus PENGENDALIAN BIAYA seperti posisi saya waktu itu.

Tapi bagaimana dengan kontraktor-kontraktor kecil & menengah seperti Anda? Boro-boro manajemen,
mencatat transaksi aja nggak pernah. Bisa karena nggak sempat, atau karena memang nggak ngerti.
Akhirnya ya pasrah aja. Proyek dikerjakan, nanti setelah selesai tinggal dilihat. Jika ada uang sisa, ya itu
untungnya. Kalo ternyata tekor/nombok? Ya udah, mau gimana lagi?

Berdasarkan pengalaman itulah, saya membuat Aplikasi Manajemen Keuangan Khusus Untuk Proyek
Konstruksi & Property.

Awalnya saya buat untuk kepentingan tugas & tanggung jawab ketika saya masih bekerja. Semakin tera
manfaatnya di proyek saya sendiri (setelah resign & menjalankan perusahaan sendiri). Sampai suatu sa
seorang teman sesama kontraktor melihat dan tertarik untuk digunakan di proyeknya.

Aplikasi itu saya beri nama KeuPRO, singkatan dari Keuangan Proyek.

Saya tidak menyangka ternyata teman saya itu sangat terbantu dengan KeuPRO. Buat dia yang awam
manajemen keuangan, KeuPRO sangat mudah karena:

* Inputnya hanya menyalin nota transaksi (belanja material, kuitansi pembayaran tukang dan
sebagainya), sisanya biarkan KeuPRO yang bekerja
* Berbasis Microsoft Excel sehingga sangat fleksibel & bisa disesuaikan dengan kebutuhan
* Serasa memiliki asisten yang khusus ngurusin administrasi keuangan, jadi dia bisa fokus di
operasional proyek

Yang jelas, sejak menggunakan KeuPRO di setiap proyeknya, dia bisa:


* MEMANTAU laba rugi real time, setiap saat, tidak harus menunggu proyek selesai
* MEMONITOR belanja setiap material kapan saja, sudah berapa yang dibeli, berapa nilainya
* MENGONTROL upah tukang sudah berapa yang dibayarkan
* MEMANTAU cashflow proyek secara rinci, uang masuk dari mana, uang keluar untuk apa s
kapan & berapa nilainya
* MENGELOLA tagihan-tagihan supplier & vendor di laporan hutang, lengkap dengan kapan ja
temponya
* Jika ada pos yang over budget, KeuPRO menjadi semacam alarm yang memberikan peringa
bisa langsung tahu dan segera mengatasi, tidak membiarkan berlarut-larut hingga proyek se
menimbulkan kerugian di belakang

* MENGETAHUI biaya-biaya overhead tak terduga, yang baru muncul ketika proyek berjalan d
tidak dianggarkan di perencanaan
* MENGAMANKAN PROFIT di setiap tahapan proyek, sehingga ketika proyek selesai profitnya
betul nyata, bukan hanya di atas kertas

Singkatnya, sejak menggunakan KeuPRO ini yang dia dapatkan:


* Efisiensi proyek meningkat hingga 20%
* Bisa menekan biaya belasan hingga puluhan juta rupiah di setiap proyek yang dikerjakan
* Profit proyek riil meningkat 10% - 25% (yang benar-benar dipegang setelah proyek selesai
* BEBAS dari stress & frustasi untuk urusan administrasi & manajemen keuangan

STOP!! Lihat dulu apa kata mereka yang sudah merasakan manfaat KeuPRO…
Lebih dari 3500 Kontraktor/Developer/Konsultan di seluruh Indonesia sudah menggunakan KeuPRO
sebagian di antaranya…
Saya tahu Anda sudah tidak sabar ingin bisa menjalankan proyek dengan efisien & profit seperti me
Proyek pada dasarnya adalah permainan angka-angka. Tidak menguasai angka, maka proyek bisa be
seperti bola liar tanpa bisa Anda kendalikan…

Ujung-ujungnya kerugian tidak bisa Anda hindari…

Saya tidak ingin Anda membayangkan betapa ruginya jika tidak menggunakan KeuPRO pada setiap pro
yang Anda kerjakan:

* Banyak kebocoran biaya yang tidak bisa dideteksi


* Boros karena belanja material / upah tukang yang over budget
* Cash tidak ada karena cashflow berantakan
* Stress & Frustrasi ngurusin administrasi keuangan dengan nota-nota yang berceceran
* Keseluruhan biaya bengkak hingga jebol, dan mengakibatkan kerugian

Tentu Anda bisa memilih, MANA YANG LEBIH PENTING, menggunakan KeuPRO atau membiarkan hal-h
atas terjadi berulang kali di setiap proyek…

Oke, SAYA mau menggunakan KeuPRO, berapa INVESTASI-nya?

Sebelum saya jawab, coba berhenti sejenak dan mulai BAYANGKAN….


* Berapa gaji yang harus Anda keluarkan jika mau merekrut orang keuangan yang profesional
berpengalaman? Minimal 2 juta/bulan. Kalikan lama waktu proyek, katakanlah 8 bulan. Suda
juta. Wah, banyak juga yaaa….

* Berapa potensi kerugian yang harus Anda tanggung karena proyek tidak efisien? Belasan, p
ratusan juta?

Padahal Anda bisa menyimpan uang tersebut untuk pengembangan perusahaan atau dipakai untuk
kepentingan lain yang lebih bermanfaat…

Jadi, berapa INVESTASI yang harus saya keluarkan?

Untuk sebuah program yang bisa menghemat uang Anda hingga puluhan juta, KeuPRO sangat murah
Garansi 365 hari uang kembali.
Artinya, setara dengan Rp 1500 per hari. Bahkan masih lebih murah dari biaya parkir !!!

Dan bisa digunakan berkali-kali, sebanyak proyek yang Anda kerjakan, sampai kapanpun tanpa ada b
waktu maupun biaya tahunan. Cukup keluar biaya investasi satu kali tanpa perlu bayar biaya perpanja
masa yang akan datang.

Selain KeuPRO untuk manajemen keuangan & PENGENDALIAN BIA


proyek, Anda juga bisa menghitung RAB dengan jauh lebih cepat d
efisien

SuperRAB memiliki:
* Lebih dari 1000 database bahan bangunan/material, tukang & alat
* Lebih dari 1400 Analisa Harga Satuan Pekerjaan
* Sistem database, update harga satuan bahan/upah, otomatis harga di Analisa Harga Satuan
ikut berubah. Tidak perlu repot-repot mengupdate satu persatu
* Tidak perlu repot mengetik nama pekerjaan & harga satuannya. Cukup input kode, maka oto
pekerjaan & harga satuan akan terisi
* Dilengkapi dengan Time Schedule & Kurva-S yang sudah nge-link dengan RAB

Analisa Harga Satuan (AHS) Pekerjaan Pada SuperRAB adalah berdasa


pengalaman kami di lapangan. Jika Anda biasa mengerjakan proye
pemerintah, AHS biasanya harus sesuai SNI. Sistem sama persis den
SuperRAB yaitu berbasis database sehingga mempercepat pekerjaa
Anda wajib memilikinya juga...
Analisa Harga Satuan (AHS) Pekerjaan Pada SuperRAB adalah berdasa
pengalaman kami di lapangan. Jika Anda biasa mengerjakan proye
pemerintah, AHS biasanya harus sesuai SNI. Sistem sama persis den
SuperRAB yaitu berbasis database sehingga mempercepat pekerjaa
Anda wajib memilikinya juga...

Lengkapi juga dengan Material Kalkulator.

Jika SuperRAB untuk menghitung biaya, maka Material Kalkulator akan menghitung rincian kebutuhan
setelah total biaya proyek diketahui.

Contoh, dari perhitungan RAB nilai proyek sebesar 500 juta. Maka dengan Material Kalkulator akan dik
kebutuhan semen 300 sak, pasir 50 m3, batu 20 m3, besi 2000 kg, bata 10.000 buah dan seterusny

Informasi kebutuhan material ini penting sekali untuk perencanaan logistik & pengadaan proyek. Supa
membeli material dalam jumlah yang tepat dan proyek jadi efisien. Salah satu sumber bengkaknya biaya
pengadaan material yang berlebihan sehingga terbuang karena tidak bisa dipakai
*Bonus-bonus Yang Akan Anda Dapatkan Untuk Paket PRO & PLATINUM
(Hanya tersedia 50 copy, siapa cepat dia dapat)
Berhubung Bonus-bonus di atas terbatas hanya 50 copy,
Pastikan Anda tidak kehabisan dan segera order sekarang juga !!
Segera ambil HP Anda…

Ketik: KEUPRO12 + nama Anda + Kota


contoh : KEUPRO12 Andi Semarang

KIRIMKAN VIA SMS / WA ke


0811 5823 587
Informasi cara order akan dikirimkan segera setelah kami menerima SMS/WA Anda
er property….

ndalikan Biaya
at Pengeluaran
get Sekaligus
a 25%

Anda Mengalami Situasi

skipun selesai tepat waktu?

ng yang tidak terkontrol sehingga

engan nota-nota belanja yang

men Hutang Yang Baik

Beruntung Karena Sesaat Lagi

suai Spek & Menguntungkan)


ketika proyek tersebut belum
overhead diluar biaya langsung

mau menerima sebuah proyek


am, spek yang diminta seperti

i, lalu ngapain proyek tersebut

ertas, proyek yang AKAN


T yang didapat betul-betul besar

paya bisa sesuai dengan RAB,


ngeluaran. Belanja material,
rduga yang tidak dianggarkan di

lebihi anggaran karena tidak ada

uai kontrak. Artinya sudah ada


BIAYA, kebanyakan mereka

get menemui hal-hal di atas. Baik


an tugas menghitung &
aya pimpin waktu itu adalah
g.

posisi terakhir sebagai profesional


adalah kawasan perumahan
PENGENDALIAN BIAYA.
al, sehingga PROFIT perusahaan

k proyek. Ada lebih dari 70 sub


r kecil dan menengah. Mereka
pagar dan sebagainya. Dengan
un saya bisa menerbitkan sampai

idak sedikit juga yang profitnya


ga sama.

MENGENDALIKAN BIAYA
erjaga tanpa harus menurunkan

Yang saya lihat, kebanyakan

mengurusi manajemen
saya waktu itu.

? Boro-boro manajemen,
a memang nggak ngerti.
Jika ada uang sisa, ya itu

an Khusus Untuk Proyek

sih bekerja. Semakin terasa


sendiri). Sampai suatu saat
yeknya.

RO. Buat dia yang awam

i pembayaran tukang dan

kan dengan kebutuhan


gan, jadi dia bisa fokus di

u proyek selesai
ang dibeli, berapa nilainya

, uang keluar untuk apa saja,

lengkap dengan kapan jatuh

yang memberikan peringatan, dia


rut-larut hingga proyek selesai &

ul ketika proyek berjalan dan


ka proyek selesai profitnya betul-

proyek yang dikerjakan


ng setelah proyek selesai)
en keuangan

anfaat KeuPRO…
h menggunakan KeuPRO. Ini
efisien & profit seperti mereka.
gka, maka proyek bisa bergerak

ri…

KeuPRO pada setiap proyek

ta yang berceceran

RO atau membiarkan hal-hal di

euangan yang profesional &


katakanlah 8 bulan. Sudah 16

tidak efisien? Belasan, puluhan,

an atau dipakai untuk

a, KeuPRO sangat murah…


ah dari biaya parkir !!!

pai kapanpun tanpa ada batasan


erlu bayar biaya perpanjangan di

NGENDALIAN BIAYA
auh lebih cepat dan

a di Analisa Harga Satuan (AHS)

kup input kode, maka otomatis

dengan RAB

AB adalah berdasarkan
engerjakan proyek
m sama persis dengan
percepat pekerjaan.
.
ulator.

hitung rincian kebutuhan material

aterial Kalkulator akan diketahui


0.000 buah dan seterusnya…

pengadaan proyek. Supaya bisa


sumber bengkaknya biaya adalah
a tidak bisa dipakai
PRO & PLATINUM
dapat)
anya 50 copy,
r sekarang juga !!!

Kota
ng

ima SMS/WA Anda