DAFTAR PENAMPANG + BOBOT TULANGAN

BATANG BULAT

UKURAN BERAT LUAS BERAT UKURAN BERAT LUAS BERAT


diameter (kg/m1) PEN. (cm2) (kg/lt) diameter (kg/m1) PEN. (cm2) (kg/lt)
5 mm 0.150 0.200 1.800 21 mm 2.720 3.460 32.640
6 mm 0.220 0.280 2.640 22 mm 2.980 3.800 35.760
7 mm 0.300 0.380 3.600 23 mm 3.260 4.150 39.120
8 mm 0.390 0.500 4.680 24 mm 3.550 4.520 42.600
9 mm 0.500 0.640 6.000 25 mm 3.850 4.910 46.200
10 mm 0.620 0.790 7.440
11 mm 0.750 0.950 9.000 26 mm 4.170 5.310 50.040
12 mm 0.890 1.130 10.680 27 mm 4.490 5.730 53.880
13 mm 1.040 1.330 12.480 28 mm 4.830 6.160 57.960
14 mm 1.210 1.540 14.520 29 mm 5.180 6.610 62.160
15 mm 1.390 1.770 16.680 30 mm 5.550 7.070 66.600
16 mm 1.580 2.010 18.960 31 mm 5.930 7.550 71.160
17 mm 1.780 2.270 21.360 32 mm 6.310 8.040 75.720
18 mm 2.000 2.540 24.000 33 mm 6.710 8.550 80.520
19 mm 2.230 2.840 26.760 34 mm 7.130 9.080 85.560
20 mm 2.460 3.140 29.520 35 mm 7.550 9.620 90.600
PERHITUNGAN KOEFISIEN TULANGAN BETON BANGUNAN KANTOR/RUMAH TINGGAL

Sloof beton 15/25 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.25 0.25 0.15 26.67 13.33
Tul. Pokok 8 12 1.00 0.89 7.120
Sengkang 5.00 6 0.80 0.22 0.880

Berat / m1 8.000
Berat / m3 U-24 213.333

Kolom 15/15 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.15 0.15 0.15 44.44 13.33
Tul. Pokok 4 10 1.00 0.62 2.480
Sengkang 5.00 6 0.60 0.22 0.660

Berat / m1 3.140
Berat / m3 U-24 139.556

Kolom 15/25cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.25 0.25 0.15 26.67 10.67
Tul. Pokok 6 12 1.00 0.89 5.340
Sengkang 5.00 6 0.80 0.22 0.880

Berat / m1 6.220
Berat / m3 U-24 165.867

Balok 15/25cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.25 0.25 0.15 26.67 10.67
Tul. Pokok 6 12 1.00 0.89 5.340
Sengkang 5.00 6 0.80 0.22 0.880

Berat / m1 6.220
Berat / m3 U-24 165.867

Ringbalk 15/15 cm,

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.15 0.15 0.15 0.15 44.44 13.33
Tul. Pokok 4 10 1.00 0.62 2.480
Sengkang 5.00 6 0.60 0.22 0.660

Berat / m1 3.140
Berat / m3 U-24 139.556
Plat lantai beton t=12 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 0.12 0.12 1.00 8.33 8.33 8.33 1.00 8.33
Tul. Pokok 20.00 8 1.00 0.39 7.800
Tul. Pokok 20.00 8 1.00 0.39 7.800

Berat / m1 15.600
Berat / m3 U-24 130.000

Plat beton cantilever t=10 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 0.1 0.10 1.00 10.00 10.00 10.00 1.00 10.00
Tul. Pokok 8.00 8 1.00 0.39 3.120
Tul. Pokok 8.00 8 1.00 0.39 3.120

Berat / m1 6.240
Berat / m3 U-24 62.400

Beton pondasi strauzfaal diameter 30 cm

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)

Tul. Pokok 6.00 12 1.00 0.89 5.340


Sengkang 6.67 8 0.94 0.39 2.449

Berat / m1 7.789
Berat / m3 U-24 81.000

Pondasi poer 1 x 1 x 0,4

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 1
Tul. Pokok 6.00 12 3.20 0.89 17.088
Tul. Pokok 3.00 12 2.00 0.89 5.340

Berat / m1 22.428
Berat / m3 U-24 37.380

Plat telapak 0.9 x 0.9

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.9 0.9 0.90 0.90 1.23 2.00
Tul. Pokok 12.00 12 2.90 0.89 30.972
Tul. Pokok 12.00 12 2.90 0.89 30.972

Berat / m1 61.944
Berat / m3 U-24 76.474

Plat telapak 1 x 1

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
1 1 1.00 1.00 1.00 2.00
Tul. Pokok 13.33 12 1.00 0.89 11.867
Tul. Pokok 13.33 12 3.65 0.89 43.313

Berat / m1 55.180
Berat / m3 U-24 55.180

Pedestal Pondasi Telapak 25/25

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.25 0.25 0.25 0.25 16.00 8.00
Tul. Pokok 10 12 1.00 0.89 8.900
Sengkang 6.67 8 1.00 0.39 2.600

Berat / m1 11.500
Berat / m3 U-24 184.000

Balok Cantilever / List Plang T.10

No. Uraian dan Tulangan (kg) Jumlah Bekisting (m2) Luas Stootwerk (m2) Luas
Ukuran beton Banyak Diameter Panjang Berat/m1 (dxfxg) Tinggi Lebar Pj. 1m3 1m3 beton Panjang Lebar 1m3 beton
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o)
0.1 0.3 0.30 0.10 33.33 13.33 33.33 0.10 3.33
Tul. Pokok 6 10 1.00 0.62 3.720
Sengkang 6.67 8 0.80 0.39 2.080

Berat / m1 5.800
Berat / m3 U-24 193.333
1.715

11458.333333

22.23376
Daftar Harga Bahan Bangunan
Tahun Anggaran 2012

No. Jenis Bahan Bangunan Sat. Harga Satuan


( Rp. )
1 2 3 4
A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
1 Pasir Urug M3 90,000.00
2 Pasir Pasang M3 195,000.00
3 Pasir Beton M3 205,000.00
4 Batu Pecah Mesin 1/2 M 3
203,000.00
5 Batu Pecah Mesin 2/3 M 3
185,000.00
6 Batu Belah Pondasi M 3
140,000.00
7 Bata Merah Bakar Bh 600.00
8 Semen PC / 40 kg Kg 1,250.00
9 Semen warna kg 10,000.00
10 Sirtu M 3
97,500.00
11 Tanah Dari Luar Lokasi M 3
35,000.00
12 Beton K-175 M 3
875,000.00
13 Beton K-225 M 3
958,000.00
14 Beton K-250 M 3
970,500.00
15 Beton K-300 M 3
1,015,000.00
16 Biaya Pompa Readymix M 3
86,000.00
B. BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
11 Plamir Tembok kg 13,500.00
12 Cat Dasar Tembok kg 30,000.00
13 Cat Tembok sek. Vinilex kg 16,000.00
14 Rool Cat Tembok Bh 27,500.00
15 Solignem 1 blek (5 Liter) ltr 8,000.00
16 Kwas 3" bh 10,000.00
17 Dempul Halus / Imfra ( Wood Filler ) kg 25,000.00
18 Ultran kg 0.00
19 Terpentin lt 12,000.00
20 Tiner A lt 21,500.00
21 Ampelas lbr 10,600.00
22 Dempul Kayu sek. Cap Kucing kg 20,500.00
23 Meni Kayu / Besi kg 22,000.00
24 Zincromat kg 30,000.00
25 Cat Dasar Kayu kg 0.00
26 Cat Kayu sek. SEIV kg 40,000.00
27 Cat Besi sek. SEIV kg 40,000.00
28 Pelumas kg 26,700.00
29 Water Proofing Membrance m' 71,500.00
30 Water Proofing Emulsion kg 90,700.00
C. BAHAN KAYU BERIKUT BAHAN JADINYA
31 Bambu diameter 5-7 cm bt 17,100.00
32 Bambu diameter 5-7 cm bt 23,500.00
33 Bambu Gombong bt 45,900.00
34 Kayu Balok Kamper Banjar M 3
5,670,000.00
35 Kayu Papan Kamper Banjar M 3
6,960,000.00
36 Kayu Balok Kamper Samarinda M 3
9,400,000.00
37 Kayu Papan Kamper Samarinda M 3
10,400,000.00
38 Kayu Balok Kamper Medan M3 5,450,000.00
39 Kayu Papan Kamper Medan M3 5,950,000.00
40 Kayu Balok meranti M3 2,750,000.00
41 Kayu Papan Borneo M3 2,750,000.00
42 Kayu Jati Jabar Dia 30 M3 7,900,000.00
43 Kayu Hutan Kelas I ( Terentang,Segeng, Mahoni, Laban ) M 3
4,186,700.00
44 Kayu Albasia M 3
650,000.00
45 List profil kamper 5 cm M 1
11,000.00
46 List profil kamper 10 cm M 1
18,500.00
47 Dolken 7 s/d 10 bt 35,000.00
48 Pegangan Tangga Profil Jati M 1
107,500.00
49 Pegangan Tangga Profil Kamper Banjar M 1
45,000.00
50 Kayu Reng 3/4 Borneo Super M 1
3,400.00
D. BAHAN PENUTUP RANGKA PLAFOND
48 Bahan plafond Eternit 4mm M2 30,000.00
49 Gypsum 120 x 240 t = 9 mm ex DN lbr 89,500.00
50 List Gypsum C - 7 Profil M1 17,000.00

No. Jenis Bahan Bangunan Sat. Harga Satuan


( Rp. )
1 2 3 4
E. BAHAN KAYU LAPIS
50 Triplek 3 mm 120 x 240 lbr 72,100.00
51 Triplek 4 mm 120 x 240 lbr 88,200.00
52 Triplek 6 mm 120 x 240 lbr 125,200.00
53 Multiplek 9 mm 120 x 240 lbr 186,200.00
54 Multiplek 12 mm 120 x 240 lbr 210,000.00
55 Multiplek 18 mm 120 x 240 lbr 239,000.00
56 Playwood 18 mm 120 x 240 lbr 294,000.00
57 Teakwood 3 mm 120 x 240 lbr 107,000.00
58 Teakwood 4 mm 120 x 240 lbr 121,000.00
59 Melamin 4 mm 120 x 240 lbr 112,000.00
60 Formika 4 mm lbr 143,000.00

F. BAHAN LANTAI DAN PELAPIS DINDING


61 Keramik 20 x 20 (KM) KW I DN Corak / Warna M2 53,600.00
62 Keramik 20 x 20 (KM) KW I DN Putih Polos M2 84,000.00
63 Keramik 25 x 33.3Dinding KM KWI DN Corak M2 85,000.00
64 Keramik 30 x 30 KW I DN Putih polos M2 40,000.00
65 Keramik 30 x 30 KW I DN Warna/Corak M2 45,000.00
66 Keramik 40 x 40 KW I DN (Warna) M 2
70,000.00
67 Granite Tile Essenza 60 x 60 Un Polis M 2
277,400.00
68 Granite Tile Essenza 40 x 40 Polis M 2
195,000.00
69 Batu Andersit M 2
195,000.00
70 Stairnosing Keramik 10 x 30 Bh 25,000.00
71 Rooster beton Bh 15,000.00
72 Glass Blok Bh 82,000.00
G. BAHAN SALURAN AIR KOTOR / BERSIH
73 Grafel U 20 cm' M1 40,000.00
74 Buis Beton dia 30 cm' M1 74,750.00
75 Buis Beton dia 60 cm M1 150,800.00
H. BAHAN LOGAM DAN BAHAN JADINYA
76 Besi Beton U-24 Rata - Rata kg 9,000.00
77 Besi Beton U-32 Rata - Rata kg 10,000.00
78 Pagar BRC M2 240,000.00
79 Kuda-kuda Rangka Baja Ringan (Zinkalum) M2 224,100.00
80 Kuda-kuda Rangka Baja Ringan (Galvalum) M2 238,700.00
81 IWF Ex DN SII kg 19,100.00
82 Besi Profil DN SII kg 17,500.00
83 Besi C Lip Chanel kg 14,000.00
84 Kawat Beton kg 25,000.00
85 Kawat Duri M1 5,500.00
86 Kawat Pengikat M 1
3,400.00
87 Kawat Las Listrik kg 17,800.00
88 Seng Plat BJLS 30 L. 55 cm M1 35,000.00
89 Seng Plat BJLS 30 L. 90 cm M1 47,500.00
89 Seng Gelombang lbr 45,000.00
90 Wermes dia. 8 mm M 2
95,000.00
91 Wermes dia. 6 mm M 2
75,000.00
92 Kusen Alumunium 3 " M 2
85,000.00
93 Alumunium Daun Pintu Kaca/Jendela M2 65,000.00
94 Guard Rill M2 346,800.00
95 Lem Sealent M2 5,500.00
96 Lem Kuning (Albond) kg 24,300.00
97 Lem Putih Fox kg 16,500.00
I. BAHAN KACA
98 Kaca Polos 3 mm M2 72,500.00
99 Kaca Polos 5 mm M2 95,000.00
100 Kaca Ray Band 5 mm M2 120,500.00
101 Kaca Ray Band 8 mm M2 347,500.00
102 Glass Blok DN 20 x 20 Bh 87,500.00
J. BAHAN PAKU DAN MUR BAUT
103 Paku 1 cm s/d 3 cm kg 20,000.00
104 Paku 4 cm s/d 7 cm kg 16,800.00
105 Paku 8 cm s/d 12 cm kg 14,900.00
106 Paku Beton 2 s/d 5 cm Bh 1,000.00
107 Besi Begel Kuda- kuda kg 15,800.00
108 Duk Angker kg 17,400.00
109 Angker Mur Baut Dia 19 mm Panjang 60 cm Bh 47,200.00
110 Mur Baut HTB Dia. 10 s/d 16 mm Bh 14,000.00
111 Mur Baut Biasa Dia. 10 s/d 16 mm Bh 8,300.00
112 Piser dia. 12 s/d 20 cm Bh 7,100.00
113 Paku Sekrup grss 35,000.00

No. Jenis Bahan Bangunan Sat. Harga Satuan


( Rp. )
1 2 3 4
K. BAHAN PERPIPAAN 1.²
114 Pipa PVC sek. "Maspion" type AW Ø 1/2" m' 4,375.00
115 Pipa PVC sek. "Maspion" type AW Ø 3/4" m' 7,333.33
116 Pipa PVC sek. "Maspion" type AW Ø 1" m' 10,000.00
117 Pipa PVC sek "Maspion" type AW Ø 1 1/4" m' 15,000.00
118 Pipa PVC sek. "Maspion" type AW Ø 1 1/2" m' 18,333.33
119 Pipa PVC sek. "Maspion" type AW Ø 2" m' 21,666.67
120 Pipa PVC sek. "Maspion" type AW Ø 2 1/2" m' 32,000.00
121 Pipa PVC sek. "Maspion" type AW Ø 3" m' 24,375.00
122 Pipa PVC sek. "Maspion" type AW Ø 4" m' 40,750.00
123 Pipa PVC sek. "Maspion" type AW Ø 6" m' 120,000.00
124 Lem Paralon ASAHI Klg 40,000.00
125 Solatip Leideng gl 5,000.00
L. BAHAN SANITAIR
126 Gate Valve 3/4 " sek Kitzh bh 250,000.00
127 Gate Valve 1 " sek. Kitzh bh 300,000.00
128 Floor Drain ex lokal bh 45,000.00
129 Kran Tembok sek. Sun Eui dia. 1/2 " bh 39,800.00
130 Kran Leher Angsa sek. Sun Eui dia. 1/2 " bh 150,000.00
131 Wastafel Lengkap sek. INA unit 302,200.00
132 Closet Jongkok Poslin warna sek. INA unit 335,400.00
133 Closet Duduk Warna Standard unit 1,550,000.00
134 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh 400,000.00
M. BAHAN PENUTUP ATAP
135 Genteng Beton bh 7,500.00
136 Bubung Genting Beton bh 15,000.00
137 Flasing Genting Beton bh 0.00
138 Genteng Murando Glazuur bh 6,500.00
139 Bubung Genting Murando Glazuur bh 16,000.00
140 Metal roof m2 6,000.00
141 Bubung Netal Roof bh 8,000.00
N. BAHAN ELEKTRIKAL
142 Lampu Gantung HLG CVA (silver) Warm Wide bh 204,000.00
143 Lampu Dinding WL CVA E27 bh 260,000.00
144 Down Light (Medium) d. 5' warmwide 14 watt bh 115,200.00
145 Down Light Halogen bh 160,000.00
146 Saklar Brocco Tunggal Standard ( 1 Phase ) bh 18,000.00
147 Saklar Brocco Seri Standard ( 1 Phase ) bh 20,500.00
148 Stop Kontak Brocco Standard ( 1 Phase ) bh 20,000.00
149 Instalasi Titik Lampu ( Upah dan Alat ) ttk 140,000.00
150 Instalasi Titik Stop Kontak ( Upah dan Alat ) ttk 148,000.00
151 Jarum Penangkal Petir bh 332,400.00
152 Kawat BC (Tembaga) kg 10,700.00
153 Pentanahan Penangkal Petir ttk 120,900.00
154 Pentanahan Panel ttk 84,600.00
O. BAHAN ALAT PENGANTUNG DAN KUNCI
155 Kunci 2 Slaag bh 159,000.00
156 Kunci Pintu KM/WC Bulat Biasa bh 85,000.00
157 Rel Marathon 1 pintu unit 497,000.00
158 Espagnollete ps 46,500.00
159 Gerendel 15 cm bh 20,500.00
159 Hak Angin Sendok Stainless / Kuningan bh 35,500.00
160 Sloot Jendela Tunggal bh 21,500.00
161 Engsel Pintu unilon standard ps 32,500.00
162 Engsel Jendela unilon standard ps 27,500.00
P. BAHAN PENAMPUNG AIR
163 Bak KM Fiber 60 x 60 bh 350,000.00
Q. BAHAN BAKAR DAN PELUMAS
164 Minyak Tanah lt 0.00
165 Minyak Solar lt 0.00
166 Bensin Premium lt 0.00
167 Minyak Bekisting lt 0.00

Ac pnasonic 1.5 pk + pasang + 4m unit 4,150,000


Ac pnasonic 2 pk + pasang + 4m unit 6,200,000
selang ac m 70,000

Daftar Upah Pekerja


Tahun Anggaran 2012

No. Jenis Pekerja Harga Upah Satuan Waktu


( Rp. )

1 PEKERJA 45,000.00 1 ORANG/ HR/ 8 JAM


2 TUKANG GALI 60,000.00 1 ORANG/ HR/ 8 JAM
3 TUKANG BATU 60,000.00 1 ORANG/ HR/ 8 JAM
4 KEPALA TUKANG BATU 70,000.00 1 ORANG/ HR/ 8 JAM
5 TUKANG KAYU 60,000.00 1 ORANG/ HR/ 8 JAM
6 KEPALA TUKANG KAYU 70,000.00 1 ORANG/ HR/ 8 JAM
7 TUKANG CAT / PELITUR 60,000.00 1 ORANG/ HR/ 8 JAM
8 KEPALA TUKANG CAT / PELITUR 70,000.00 1 ORANG/ HR/ 8 JAM
9 TUKANG BESI BETON 60,000.00 1 ORANG/ HR/ 8 JAM
10 KEPALA TUKANG BESI BETON 70,000.00 1 ORANG/ HR/ 8 JAM
11 TUKANG BESI PROFIL 60,000.00 1 ORANG/ HR/ 8 JAM
12 KEPALA TUKANG BESI PROFIL 70,000.00 1 ORANG/ HR/ 8 JAM
13 MANDOR 80,000.00 1 ORANG/ HR/ 8 JAM
MINIMAL MAKSIMAL

48,000 69,000 90,000


59,000 83,500 108,000
72,000 97,000 122,000
87,000 118,500 150,000
80,000 112,000 144,000
50,000 72,500 95,000
200 288 375
640 914 1,188
3,500 4,500 5,500
41,000 63,500 86,000
19,000 16,000 29,000
377,900 436,400 494,900
402,300 464,600 526,900
415,400 479,700 544,000
439,400 507,450 575,500
35,000 47,500 60,000

7,800 9,400 11,000


-
21,000 23,500 26,000
27,500 28,750 30,000
5,520 5,730 5,940
10,600 11,550 12,500
31,800 33,400 35,000
-
3,500 3,750 4,000
13,500 14,000 14,500
3,000 3,500 4,000
41,800 44,400 47,000
12,500 15,250 18,000
40,300 41,350 42,400
-
41,800 43,800 45,800
29,500 35,700 41,900
15,000 20,000 25,000

2,500,000 2,950,000 3,400,000


2,559,000 2,883,500 3,208,000
1,891,000 2,095,500 2,300,000
1,915,000 2,232,500 2,550,000
1,071,000 1,210,500 1,350,000
-
4,300 5,050 5,800

14,000 24,500 35,000

-
9,000 19,500 30,000
45,000 54,300 63,600

35,000 46,600 58,200


45,000 57,750 70,500
70,000 84,300 98,600
95,000 116,000 137,000
125,000 151,950 178,900
165,000 194,500 224,000
97,500 122,250 147,000
56,000 77,000 98,000

100,000 103,500 107,000

-
37,000 43,600 50,200

30,000 35,900 41,800


25,000 37,500 50,000
39,000 48,500 58,000

150,000 165,000 180,000

50,000 72,500 95,000


7,000 48,500 90,000
-
78,200 80,100 82,000
-
17,500 27,500 37,500
35,000 54,875 74,750
95,000 118,155 141,310
-
5,500 6,500 7,500
7,800 8,900 10,000

9,700 10,400 11,100


7,900 8,700 9,500
7,400 8,000 8,600
12,000 14,850 17,700

14,700 15,700 16,700


28,400 29,200 30,000

-
14,900 15,800 16,700
17,500 18,750 20,000
13,100 13,500 13,900
13,000 15,250 17,500

56,100 57,350 58,600


82,900 84,900 86,900

309,800 317,750 325,700


-
14,300 14,650 15,000
13,300 13,600 13,900
11,600 11,850 12,100

0 5,280 5,610 5,940


0 6,000 6,375 6,750
0 6,750 8,000 9,250
0 9,500 11,000 12,500
0 12,500 14,375 16,250
0 16,625 20,188 23,750
0 21,250 25,625 30,000
0 28,000 30,438 32,875
0 41,000 42,500 44,000
0 112,750 113,208 113,666
-
-
-
-
-
- Wavin 0,5 inci Rp 17.500
0,75 inci Rp 22.000
1 inci Rp 30.000
2 inci Rp 65.000
3 inci Rp 120.000
4 inci Rp 200.000
-
-
83,700 87,150 90,600
8,700 8,850 9,000
-
5,400 5,850 6,300
6,400 6,600 6,800

-
-
-
-
-

-
477,100 488,600 500,100
31,800 32,600 33,400

41,800 42,700 43,600

46,800 48,300 49,800


15,500 16,350 17,200
15,000 16,100 17,200
10,500 12,100 13,700
-
-
-
-
-
-
-
52,291.00 -
65,364.00 -
65,364.00 -
78,437.00 -
65,364.00 -
78,437.00 -
65,364.00 -
78,437.00 -
65,364.00 -
78,437.00 -
65,364.00 -
78,437.00 -
80,000.00 -
Semen Tiga Roda (50 kg) Rp 55.000
Semen Tiga Roda Putih (40 kg) Rp 73.000
Semen Gresik (50 kg) Rp 53.500
Semen Holcim Rp 54.000

BESI BETON
Diameter 6mm (12m) Rp 22.000
Diameter 8mm (12m) Rp 35.000
Diameter 10mm (12m) Rp 47.500
Diameter 12mm (12m) Rp 70.000
Diameter 16mm (12m) Rp 135.000

KAYU

Reng
Meranti (2×3) per batang Rp 15.000
Meranti (3×4) per batang Rp 17.500
Borneo (2×3) per batang Rp 20.500
Borneo (3×4) per batang Rp 22.000
Kamper (2×3) per batang Rp 17.000
Kamper (3×4) per batang Rp 20.500

Kaso
Meranti (4×6) per batang Rp 32.500
Meranti (5×7) per batang Rp 39.000
Borneo (4×6) per batang Rp 28.000
Borneo (5×7) per batang Rp 43.000
Kamper (4×6) per batang Rp 50.000
Kamper (5×7) per batang Rp 70.000

Galar
Meranti (5×10) per batang Rp 60.000
Borneo (5×10) per batang Rp 60.000
Kamper (5×10) per batang Rp 95.000

 Balok
Meranti (6×12) per batang Rp 80.000
Meranti (8×12) per batang Rp 125.000
Borneo (6×12) per batang Rp 80.000
Borneo (8×12) per batang Rp 100.000
Kamper (6×12) per batang Rp 185.000
Kamper (8×12) per batang Rp 210.000

PASIR & BATU


Pasir Lampung (per m3) Rp 175.000
Pasir Pasang (per m3) Rp 145.000
Pasir Beton (per m3) Rp 145.000
Pasir Mondu (per m3) Rp. 165.000
Pasir Urug (per m3) Rp 98.000 – 100.000
Pasir Putih Bangka(per m3) Rp 180.000
Sirtu(per m3) Rp 100.000
Split (per m3) Rp 145.000
Makadam (per m3) Rp 130.000
Batu Kali Belah (per m3) Rp 125.000
Biscos (per m3) Rp 140.000
Sirdam (per m3) Rp. 130.000
Abu batu (per m3) Rp. 125.000
Tanah Merah (per m3) Rp. 95.000
Batu Bata Merah Pres Mesin (buah) Rp 500
Batu Bata Merah Proses Tangan (buah) Rp 350

HEBEL
Blok Reguler Tebal 10 mm (per m3) Rp 560.000
Blok Jumbo (per m3) Rp 550.000
Anak Tangga (per m3) Rp 2.000.000
Panel (per m3) Rp 255.000

PAKU
A. Paku Kayu/Triplek
ukuran 1-4cm (per kg) Rp 13.000
ukuran 5-12cm (per kg) Rp 13.000
B. Paku Beton biasa (semua ukuran)/dus Rp 27.000
Paku Beton bagus (semua ukuran)/dus Rp 32.000
C. Kawat Beton Rp 16.500
D. Paku GRC Rp. 22.500

TRIPLEK
Tebal 3mm Rp 40.000
Tebal 4mm Rp 50.000
Tebal 6mm Rp 65.000
Tebal 9mm Rp 100.000
Tebal 12mm Rp 135.000
Tebal 15mm Rp 175.000
Tebal 18mm Rp 195.000
GRC BOARD Rp. 50.000

KACA

A. Kaca Bening
Tebal 3mm Rp 80.000
Tebal 5mm Rp 87.500
Tebal 8mm Rp 140.000
Tebal 10mm Rp 200.000

B. Kaca Rayben
Tebal 3mm Rp 65.000
Tebal 5mm Rp 62.500
Tebal 6mm Rp 125.000
Tebal 8mm Rp 220.000

PAPAN FIBER SEMEN (GRC):

Ukuran Triplek :
Big Flat Elephant (120×200) 9mm Rp 47.000
Big Flat Elephant (122×244) 4mm Rp 44.500
Big Flat Elephant (122×244) 6mm Rp 72.000
Big Flat Elephant (122×244) 8mm Rp 98.000

Ukuran Papan :
Wood Plank Elephant (4050×100) 8mm Rp 50.000
Wood Plank Elephant (4050×200) 8mm Rp 65.000
Wood Plank Elephant (4050×300) 10mm Rp 75.000

PAPAN GYPSUM

Ukuran Gypsum :
Merk Jaya (120×240) 9mm Rp 58.000
Merk Elephant (120×240) 9mm Rp 50.000
Merk Knauf (120×240) Rp 50.000

CAT TEMBOK

A. Interior
Dulux Pearl Glo (2,5 lt ) Rp. 180.000
Dulux Pentalite Standard Colour ( 2,5 lt ) Rp. 137.000
Dulux Weather Shield Exterior/Brilliant white ( 2,5 lt ) Rp. 215.000
Dulux (2,5 lt) Rp 117.500
Dulux (20 lt) Rp 850.000
Mowilex ( 1 lt ) Rp. 60.000
Mowilex (2,5 lt) Rp 130.000
Mowilex (20 lt) Rp. 915.000
Catylac (5 kg) Rp 93.500
Catylac (25 kg) Rp 355.000
Avitex ( 5 kg ) Rp. 73.500
Vinilex (5 kg) Rp 75.000
Vinilex (25 kg) Rp 445.000
Metrolite ( 1 kg ) Rp. 24.000
Metrolite (3 lt) Rp 78.000
Metrolite ( 16 ltr / pail) Rp 380.000
Matex ( 4kg) Rp 60.000
Matex (25 kg) Rp 295.000
Profitex (5 kg) Rp 26.500
Profitex (25 kg) Rp 120.000

B. Eksterior
Dulux (2,5 lt) Rp 187.500
Dulux (20 lt) Rp 1.285.000
Mowilex (2,5 lt) Rp 160.000
Mowilex (20 lt) Rp 1.250.000

CAT KAYU
Dulux 1 kg Rp 35.000
Mowilex 1 kg Rp 60.000
Catylac 1 kg Rp 35.000
Glotex 1 kg Rp 35.000
Emco 1 kg Rp 35.000
Globe Supergloss Rp 43.000

GENTENG KERAMIK

Kanmuri Milenio (Double Interlocking)


- Warna Natural Rp 5.700
- Warna Standard Rp 6.500
- Warna Spesial Rp 8.500
- Warna Exclusive Rp 11.500

Kanmuri Espancia
- Warna Natural Rp 5.500
- Warna Standard Rp 8.700
- Warna Spesial Rp 9.700
- Warna Exclusive Rp 10.500

M Class (Double Interlocking)


- Warna Natural Rp 5.500
- Warna Standard Rp 6.000
- Warna Spesial Rp 8.000
- Warna Premium Rp 11.000
- Genteng Knok Natural Rp 15.000

GENTENG BETON
- Morando Rp. 3.750,-/pc (20pcs/m2)
- Berglazur Rp 3.500,-
- Natural Rp 2.000
- Moner Rp 5.350,- (9pcs/m2)

IDEAL
- Berglazur Rp 2.650/pc
- Natural Rp 1.750/pc

GENTENG METAL
Sun Roof Venus 79.5714286
Ukuran 38,5 x 80 cm S/S Rp 23.000
Ukuran 38,5 x 80 cm D/S Rp 27.500
Sun Roof Pluto
Ukuran 38,5 x 80 cm S/S Rp 17.500
Ukuran 38,5 x 80 cm D/S Rp 20.000

ASBES
Jabesmen
150×105 (per lembar gelombang kecil) Rp 40.000
180×105 (per lembar gelombang kecil) Rp 45.000
210×105 (per lembar gelombang kecil) Rp 50.000
240×105 (per lembar gelombang kecil) Rp 55.500
270×105 (per lembar gelombang kecil) Rp 65.000
300×105 (per lembar gelombang kecil) Rp 75.000

SENG GELOMBANG
Seng Plat
Tebal 0.20 Rp 27.500
Tebal 0.25 Rp 37.500
Tebal 0.30 Rp 42.500
Seng Gelombang
Tebal 0.20 Rp 49.000
Tebal 0.30 Rp 59.000

PIPA PVC

- Wavin 0,5 inci Rp 17.500


0,75 inci Rp 22.000
1 inci Rp 30.000
2 inci Rp 65.000
3 inci Rp 120.000
4 inci Rp 200.000

- Rucika 0,5 inci Rp 25.000


1 inci Rp 45.000
2 inci Rp 52.500
4 inci Rp 168.000
8 inci Rp 635.000

- Lucky
0,5 inci Rp 8.500
0,75 inci Rp 13.000
1 inci Rp 15.000
2 inci Rp 33.000
3 inci Rp 64.000
4 inci Rp 103.000

- Unggul
0,5 inci Rp 8.500
0,75 inci Rp 11.000
1 inci Rp 15.000
2 inci Rp 27.000
3 inci Rp 40.000
4 inci Rp 55.000

- Maspion
0,5 inci Rp 13.500
0,75 inci Rp 16.500
1 inci Rp 21.500
2 inci Rp 51.500
3 inci Rp 100.000
4 inci Rp 150.000

KERAMIK LANTAI ARWANA


20×20
Tua Rp 35.000
Muda Rp 34.000
30×30
Putih Rp 30.000
Marble Rp 32.000
Fancy Rp 37.500
40×40
Putih Rp 30.000
Marble Rp 33.000

LANTAI KAYU
Kronotec (per meter) Rp 225.000
HDM Glossy (per boks) Rp 550.000

KERAMIK DINDING

20×20

Roman
(putih) Rp 50.000
(motif) Rp 55.000

Masterina
(putih) Rp 40.000
(motif) Rp 50.000

KIA
(putih) Rp 37.500
(motif) Rp 42.500
20×25

Mulia
(warna muda) Rp 45.000
(warna tua) Rp 50.000

IKAD
(warna muda) Rp 42.500
(warna tua) Rp 52.500

Roman
25×33 Roman Rp 50.000
33×50 Roman Rp 80.000
30×30 Hercules (putih) Rp 42.500
Acura (putih) Rp 35.000
KIG (warna) Rp 40.000
KIA (warna) Rp 40.000
60 x 60 Platinum Rp 125.000
30 x 60 Platinum Rp 75.000
58 x 58 Platinum Rp 110.000

SANITARI

KLOSET DUDUK
Sanremo Classis CCST Rp 1.325.000
Lexington Rp 3.500.000
Granada 3000 CCST Rp 1.275.000
Granada II Space CCST Rp 1.500.000
Projecta Rp 1.000.000

KLOSET JONGKOK
Rapi EX Squat Rp 250.000
WASTAFEL/LAVATORY
San Remo 55 Lava & Pedestal Rp 650.000
Studio 3000 Lava & Pedestal Rp 475.000
Studio 50 Lavatory Rp 250.000
Studio 45 Lavatory Rp 200.000

GRANIT
Impero 40×40 Rp 125.000
Granito 40×40 Rp 210.000
Inesa 40×40 Rp 175.000
Niro 40×40 Rp 160.000
Essenza 40×40 Rp 175.000

KUNCI
Firo Rp 275.000
Napoli Rp 30.000
Romaco Rp 65.000
Ferza Rp 33.500
Top Rp 30.000
Paloma Rp 420.000
Yale Rp 125.000
Beluci Rp 130.000
ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2012

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
1 1 M2 Pek. Kantor Direksi
Kayu m3 0.1000 2,750,000 275,000.00
Paku 5-7 kg 0.2500 16,800 4,200.00
Seng Gelombang BJLS 30 (80x180) m2 1.1000 30,000 33,000.00
Tripleks 4 mm lbr 0.5000 88,200 44,100.00
Semen PC 50 kg kg 35.0000 1,250 43,750.00
Pasir Pasang m3 0.2500 195,000 48,750.00
Bata Merah bh 70.0000 600 42,000.00
Peralatan lot 0.0200 490,800 9,816.00
Ongkos Pasang lot 0.1500 500,622 75,093.30
Jumlah 500,622.00 75,100.30 575,722.30
Keuntungan maksimal 10% 57,572.23
Jumlah 633,294.53
Dibulatkan 633,200.00
2 1 M2 Papan Nama Proyek
Kayu Borneo super m3 0.1300 2,750,000 357,500.00
Paku 5-7 kg 0.2500 16,800 4,200.00
Cat minyak ls 1.0000 12,000 12,000.00
Penulisan ls 0.1250 200,000 25,000.00
Ongkos Pasang ls 0.1250 200,000 25,000.00
Jumlah 398,700.00 25,000.00 423,700.00
Keuntungan Maksimal 42,370.00
Jumlah Harga 466,070.00
3 1 m3 Pekerjaan Bongkaran
Tenaga:
Pekerja Oh 6.667 45,000.00 - 300,015.00
Mandor Oh 0.033 80,000.00 - 2,640.00
Jumlah - 302,655.00 302,655.00
Keuntungan maksimal 10% 30,265.50
Jumlah 332,920.50
Dibulatkan 332,900.00
4 1 m² Membersihkan lapangan dan perataan
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Mandor Oh 0.050 80,000.00 - 4,000.00
Jumlah - 17,500.00 17,500.00
Keuntungan maksimal 10% 1,750.00
Jumlah 19,250.00
Dibulatkan 19,200.00
5 1 m¹ Pengukuran dan pemasangan bouwplank
Bahan:
Kayu kaso, albasia M³ 0.012 650,000.00 7,800.00 -
Paku biasa 2" - 5" Kg 0.020 16,800.00 336.00 -
Kayu papan 3/20 M³ 0.005 650,000.00 3,250.00 -
Tenaga:
Pekerja Oh 0.100 45,000.00 - 4,500.00
Tukang kayu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang kayu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.005 80,000.00 - 400.00
Jumlah 11,386.00 11,600.00 22,986.00
Keuntungan maksimal 10% 2,298.60
Jumlah 25,284.60
Dibulatkan 25,200.00
6 1 m³ Galian tanah biasa sedalam 1 meter
Tenaga:
Pekerja Oh 0.600 45,000.00 - 27,000.00
Mandor Oh 0.040 80,000.00 - 3,200.00
Jumlah - 30,200.00 30,200.00
Keuntungan maksimal 10% 3,020.00
Jumlah 33,220.00
Dibulatkan 33,200.00
7 1 m³ Galian tanah biasa sedalam 2 meter
Tenaga:
Pekerja Oh 1.750 45,000.00 - 78,750.00
Mandor Oh 0.052 80,000.00 - 4,160.00
Jumlah - 82,910.00 82,910.00
Keuntungan maksimal 10% 8,291.00
Jumlah 91,201.00
Dibulatkan 91,200.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
8 1 M3. Galian Tanah Pondasi Straus
Tenaga:
Tukang gali Oh 1.800 60,000.00 108,000.00
Mandor Oh 0.050 80,000.00 4,000.00
Alat Bantu ls 0.200 112,000.00 22,400.00
Jumlah 134,400.00 134,400.00
Keuntungan maksimal 10% 13,440.00
Jumlah 147,840.00
Dibulatkan 147,800.00
9 1 m³ Urugan tanah kembali
Tenaga:
Pekerja Oh 0.292 45,000.00 - 13,140.00
Mandor Oh 0.019 80,000.00 - 1,520.00
Jumlah 14,660.00 14,660.00
Keuntungan maksimal 10% 1,466.00
Jumlah 16,126.00
Dibulatkan 16,100.00
10 1 m³ Pemadatan tanah setiap 20 cm, tanah dari luar lokasi.
Bahan:
Tanah dari luar lokasi M³ 1.200 35,000.00 42,000.00 -
Alat bantu ls 1.000 12,130.00 12,130.00 -
Tenaga:
Pekerja Oh 0.250 45,000.00 - 11,250.00
Mandor Oh 0.011 80,000.00 - 880.00
Jumlah 54,130.00 12,130.00 66,260.00
Keuntungan maksimal 10% 6,626.00
Jumlah 72,886.00
Dibulatkan 72,800.00
11 1 m³ Pemadatan tanah setiap 20 cm, tanah di lokasi.
Tenaga:
Pekerja Oh 0.500 45,000.00 - 22,500.00
Mandor Oh 0.050 80,000.00 - 4,000.00
Jumlah 26,500.00 26,500.00
Keuntungan maksimal 10% 2,650.00
Jumlah 29,150.00
Dibulatkan 29,100.00
12 1 m³ Urugan pasir
Bahan:
Pasir urug M³ 1.200 195,000.00 234,000.00 -
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Mandor Oh 0.010 80,000.00 - 800.00
Mobilisasi Lot 0.050 234,000.00 11,700.00
Jumlah 234,000.00 26,000.00 260,000.00
Keuntungan maksimal 10% 26,000.00
Jumlah 286,000.00
Dibulatkan 286,000.00
13 1 m³ Urugan Sirtu
Bahan:
Sirtu M³ 1.100 97,500.00 107,250.00 -
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Mandor Oh 0.010 80,000.00 - 800.00
Mobilisasi Lot 0.050 107,250.00 5,362.50
Jumlah 107,250.00 19,662.50 126,912.50
Keuntungan maksimal 10% 12,691.25
Jumlah 139,603.75
Dibulatkan 139,600.00
14 1 m³ Pasang pondasi batu kosong ( aanstamping ).
Bahan:
Batu belah 15/20 cm M³ 1.100 140,000.00 154,000.00 -
Pasir urug M³ 0.300 90,000.00 27,000.00 -
Tenaga:
Pekerja Oh 0.780 45,000.00 - 35,100.00
Tukang batu Oh 0.390 60,000.00 - 23,400.00
Kepala tukang batu Oh 0.039 70,000.00 - 2,730.00
Mandor Oh 0.039 80,000.00 - 3,120.00
Mobilisasi Lot 181,000.00 -
Jumlah 181,000.00 64,350.00 245,350.00
Keuntungan maksimal 10% 24,535.00
Jumlah 269,885.00
Dibulatkan 269,800.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
15 1 m³ Pasang pondasi batu kali, 1 Pc. : 3 Ps.
Bahan:
Batu belah 15/20 cm M³ 1.100 140,000.00 154,000.00 -
Semen portland M³ 202.000 1,250.00 252,500.00 -
Pasir pasang M³ 0.485 195,000.00 94,575.00 -
Tenaga:
Pekerja Oh 1.500 45,000.00 - 67,500.00
Tukang batu Oh 0.600 60,000.00 - 36,000.00
Kepala tukang batu Oh 0.060 70,000.00 - 4,200.00
Mandor Oh 0.075 80,000.00 - 6,000.00
Jumlah 501,075.00 113,700.00 614,775.00
Keuntungan maksimal 10% 61,477.50
Jumlah 676,252.50
Dibulatkan 676,200.00
16 1 m³ Pasang pondasi batu kali, 1 Pc. : 5 Ps.
Bahan:
Batu belah 15/20 cm M³ 1.200 140,000.00 168,000.00 -
Semen portland kg 135.000 1,250.00 168,750.00 -
Pasir pasang M³ 0.544 195,000.00 106,080.00 -
Tenaga:
Pekerja Oh 1.000 45,000.00 - 45,000.00
Tukang batu Oh 0.500 60,000.00 - 30,000.00
Kepala tukang batu Oh 0.060 70,000.00 - 4,200.00
Mandor Oh 0.075 80,000.00 - 6,000.00
Mobilisasi Lot 0.050 442,830.00
Jumlah 442,830.00 85,200.00 528,030.00
Keuntungan maksimal 10% 52,803.00
Jumlah 580,833.00
Dibulatkan 580,800.00
17 1 m3 Pondasi Strausz
Bahan:
Beton Ready Mix K- 250 M³ 1.030 970,500.00 999,615.00
Besi Beton U.32 kg 81.000 10,000.00 810,003.90
Jumlah 1,809,618.90 1,809,618.90
Keuntungan maksimal 10% 180,961.89
Jumlah 1,990,580.79
Dibulatkan 1,990,580.00
18 1 m3 Pondasi Poer
Bahan:
Beton Ready Mix K- 250 M³ 1.0300 970,500.00 999,615.00
Besi Beton U.32 kg 37.3800 10,000.00 373,800.00
Jumlah 1,373,415.00 1,373,415.00
Keuntungan maksimal 10% 137,341.50
Jumlah 1,510,756.50
Dibulatkan 1,510,750.00
19 1 m2 Pasangan Batu Andersit
Bahan:
Batu Andersit Uk. 5 x 60 M2 1.100 195,000.00 214,500.00 214,500.00
Semen portland kg 0.120 1,250.00 150.00 150.00
Pasir pasang M³ 0.031 195,000.00 6,045.00 6,045.00
Tenaga:
Pekerja Oh 0.288 45,000.00 12,937.50 12,937.50
Tk. Batu Oh 0.325 60,000.00 19,500.00 19,500.00
Kep. Tk. Batu Oh 0.175 70,000.00 12,250.00 12,250.00
Mandor Oh 0.034 80,000.00 2,704.00 2,704.00
Jumlah 220,695.00 47,391.50 268,086.50
Keuntungan maksimal 10% 26,808.65
Jumlah 294,895.15
Dibulatkan 294,800.00
20 1 m² Pasangan bata merah tebal ½ bata, 1 Pc. : 3 Ps.
Bahan:
Bata merah Bh 70.000 600.00 42,000.00 -
Semen portland Kg 14.370 1,250.00 17,962.50 -
Pasir pasang M³ 0.040 195,000.00 7,800.00 -
Tenaga:
Pekerja Oh 0.320 45,000.00 - 14,400.00
Tukang batu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang batu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.015 80,000.00 - 1,200.00
Mobilisasi Lot 0.050 67,762.50 3,388.13
Jumlah 67,762.50 25,688.13 93,450.63
Keuntungan maksimal 10% 9,345.06
Jumlah 102,795.69
Dibulatkan 102,700.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
21 1 m² Pasangan bata merah tebal ½ bata, 1 Pc. : 5 Ps.
Bahan:
Bata merah Bh 70.000 600.00 42,000.00 -
Semen portland Kg 9.680 1,250.00 12,100.00 -
Pasir pasang M³ 0.045 195,000.00 8,775.00 -
Tenaga:
Pekerja Oh 0.320 45,000.00 - 14,400.00
Tukang batu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang batu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.015 80,000.00 - 1,200.00
Mobilisasi Lot 0.050 62,875.00 3,143.75
Jumlah 62,875.00 25,443.75 88,318.75
Keuntungan maksimal 10% 8,831.88
Jumlah 97,150.63
Dibulatkan 97,100.00
22 1 m² Pasangan dinding rooster / terawang. ( 12 x 11 x 24 cm )
Bahan:
Rooster / terawang Bh 34.000 15,000.00 510,000.00 -
Semen portland Kg 12.800 1,250.00 16,000.00 -
Pasir pasang M³ 0.035 195,000.00 6,825.00 -
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Tukang batu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang batu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.015 80,000.00 - 1,200.00
Jumlah 532,825.00 21,400.00 554,225.00
Keuntungan maksimal 10% 55,422.50
Jumlah 609,647.50
Dibulatkan 609,600.00
23 1 m² Pasangan Glass Blok
Bahan:
Glas Blok 20 x 20 Bh 25.000 82,000.00 2,050,000.00 -
Semen portland Kg 12.800 12,000.00 153,600.00 -
Pasir pasang M³ 0.035 195,000.00 6,825.00 -
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Tukang batu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang batu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.015 80,000.00 - 1,200.00
Jumlah 2,210,425.00 21,400.00 2,231,825.00
Keuntungan maksimal 10% 223,182.50
Jumlah 2,455,007.50
Dibulatkan 2,455,000.00
24 1 m² Plesteran 1 Pc. : 3 Ps; tebal 15 mm.
Bahan:
Semen portland kg 6.480 1,250.00 8,100.00 -
Pasir pasang M³ 0.088 195,000.00 17,160.00 -
Tenaga:
Pekerja Oh 0.200 45,000.00 - 9,000.00
Tukang batu Oh 0.350 60,000.00 - 21,000.00
Kepala tukang batu Oh 0.015 70,000.00 - 1,050.00
Mandor Oh 0.010 80,000.00 - 800.00
Jumlah 25,260.00 31,850.00 57,110.00
Keuntungan maksimal 10% 5,711.00
Jumlah 62,821.00
Dibulatkan 62,800.00
25 1 m² Plesteran + Acian 1 Pc. : 5 Ps; tebal 15 mm.
Bahan:
Semen portland M² 6.320 1,250.00 7,900.00 -
Pasir pasang M³ 0.088 195,000.00 17,160.00 -
Tenaga:
Pekerja Oh 0.200 45,000.00 - 9,000.00
Tukang batu Oh 0.350 60,000.00 - 21,000.00
Kepala tukang batu Oh 0.015 70,000.00 - 1,050.00
Mandor Oh 0.010 80,000.00 - 800.00
Jumlah 25,060.00 31,850.00 56,910.00
Keuntungan maksimal 10% 5,691.00
Jumlah 62,601.00
Dibulatkan 62,600.00
Harga Jumlah Harga Jumlah Harga
No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
26 1 m² Penebalan Plesteran + Acian 1 Pc. : 5 Ps; tebal 15 mm.
Bahan:
Semen portland M² 7.940 16,000.00 127,040.00 -
Pasir pasang M³ 0.039 195,000.00 7,605.00 -
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Tukang batu Oh 0.200 60,000.00 - 12,000.00
Kepala tukang batu Oh 0.020 70,000.00 - 1,400.00
Mandor Oh 0.013 80,000.00 - 1,040.00
Jumlah 134,645.00 27,940.00 162,585.00
Keuntungan maksimal 10% 16,258.50
Jumlah 178,843.50
Dibulatkan 178,800.00
27 1 m² Plesteran beton 1 Pc. : 3 Ps; tebal 15 mm.
Bahan:
Semen portland Kg 7.070 1,250.00 8,837.50 -
Pasir pasang M³ 0.021 195,000.00 4,095.00 -
Tenaga:
Pekerja Oh 0.260 45,000.00 - 11,700.00
Tukang batu Oh 0.200 60,000.00 - 12,000.00
Kepala tukang batu Oh 0.020 70,000.00 - 1,400.00
Mandor Oh 0.013 80,000.00 - 1,040.00
Jumlah 12,932.50 26,140.00 39,072.50
Keuntungan maksimal 10% 3,907.25
Jumlah 42,979.75
Dibulatkan 42,900.00
28 1 m² Lapisan Waterprofing
Bahan:
Waterproofing Membrance m' 1.100 71,500.00 78,650.00 -
Tenaga:
Pekerja Oh 0.120 45,000.00 - 5,400.00
Tukang Oh 0.120 60,000.00 - 7,200.00
Kepala tukang Oh 0.012 70,000.00 - 840.00
Mandor Oh 0.006 80,000.00 - 480.00
Peralatan ls 0.100 78,650.00 7,865.00
Jumlah 78,650.00 21,785.00 100,435.00
Keuntungan maksimal 10% 10,043.50
Jumlah 110,478.50
Dibulatkan 110,400.00
29 1 m² Lapisan Waterprofing Coating
Bahan:
Waterproofing Coating kg 2.000 90,700.00 181,400.00 -
Tenaga:
Pekerja Oh 0.120 45,000.00 - 5,400.00
Tukang Oh 0.120 60,000.00 - 7,200.00
Kepala tukang Oh 0.012 70,000.00 - 840.00
Mandor Oh 0.006 80,000.00 - 480.00
Jumlah 181,400.00 13,920.00 195,320.00
Keuntungan maksimal 10% 19,532.00
Jumlah 214,852.00
Dibulatkan 214,800.00
30 1 m² Pasang kaca, tebal 3 mm
Bahan:
Kaca tebal 3 mm M² 1.100 72,500.00 79,750.00
Tenaga:
Pekerja Oh 0.015 45,000.00 - 675.00
Tukang kayu Oh 0.150 60,000.00 - 9,000.00
Kepala tukang kayu Oh 0.015 70,000.00 - 1,050.00
Mandor Oh 0.001 80,000.00 - 60.00
Jumlah 79,750.00 10,785.00 90,535.00
Keuntungan maksimal 10% 9,053.50
Jumlah 99,588.50
Dibulatkan 99,500.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
31 1 m² Pasang kaca, tebal 5 mm
Bahan:
Kaca tebal 5 mm M² 1.100 95,000.00 104,500.00 -
Tenaga:
Pekerja Oh 0.015 45,000.00 - 675.00
Tukang kayu Oh 0.150 60,000.00 - 9,000.00
Kepala tukang kayu Oh 0.015 70,000.00 - 1,050.00
Mandor Oh 0.001 80,000.00 - 60.00
Jumlah 104,500.00 10,785.00 115,285.00
Keuntungan maksimal 10% 11,528.50
Jumlah 126,813.50
Dibulatkan 126,800.00
32 1 m² Pasang kaca, tebal 8 mm
Bahan:
Kaca tebal 8 mm M² 1.100 87,500.00 96,250.00 -
Tenaga:
Pekerja Oh 0.015 45,000.00 - 675.00
Tukang kayu Oh 0.150 60,000.00 - 9,000.00
Kepala tukang kayu Oh 0.015 70,000.00 - 1,050.00
Mandor Oh 0.001 80,000.00 - 60.00
Jumlah 96,250.00 10,785.00 107,035.00
Keuntungan maksimal 10% 10,703.50
Jumlah 117,738.50
Dibulatkan 117,700.00
33 1 Buah pasang engsel pintu.
Bahan:
Engsel pintu Unilon Standard Bh 1.000 32,500.00 32,500.00 -
Tenaga:
Pekerja Oh 0.015 45,000.00 - 675.00
Tukang kayu Oh 0.400 60,000.00 - 24,000.00
Kepala tukang kayu Oh 0.015 70,000.00 - 1,050.00
Mandor Oh 0.001 80,000.00 - 60.00
Jumlah 32,500.00 25,785.00 58,285.00
Keuntungan maksimal 10% 5,828.50
Jumlah 64,113.50
Dibulatkan 64,100.00
34 1 Buah pasang engsel jendela kupu - kupu.
Bahan:
Engsel jendela Bh 1.000 27,500.00 27,500.00 -
Tenaga:
Pekerja Oh 0.010 45,000.00 - 450.00
Tukang kayu Oh 0.400 60,000.00 - 24,000.00
Kepala tukang kayu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.001 80,000.00 - 40.00
Jumlah 27,500.00 25,190.00 52,690.00
Keuntungan maksimal 10% 5,269.00
Jumlah 57,959.00
Dibulatkan 57,900.00
35 1 Buah Kunci 2 Slaag Silinder utama Standard
Bahan:
Kunci 2 Slaag silinder utama Bh 1.000 159,000.00 159,000.00 -
Tenaga:
Pekerja Oh 0.010 45,000.00 - 450.00
Tukang kayu Oh 0.500 60,000.00 - 30,000.00
Kepala tukang kayu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.005 80,000.00 - 400.00
Jumlah 159,000.00 31,550.00 190,550.00
Keuntungan maksimal 10% 19,055.00
Jumlah 209,605.00
Dibulatkan 209,600.00
36 1 Buah pasang kunci tanam kamar mandi.
Bahan:
Kunci tanam kamar mandi Bh 1.000 20,000.00 20,000.00 -
Tenaga:
Pekerja Oh 0.005 45,000.00 - 225.00
Tukang kayu Oh 0.500 60,000.00 - 30,000.00
Kepala tukang kayu Oh 0.005 70,000.00 - 350.00
Mandor Oh 0.003 80,000.00 - 200.00
Jumlah 20,000.00 30,775.00 50,775.00
Keuntungan maksimal 10% 5,077.50
Jumlah 55,852.50
Dibulatkan 55,800.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
37 1 Buah pasang kait angin.
Bahan:
Kait angin type sendok, stainless Bh 1.000 35,500.00 35,500.00 -
Tenaga:
Pekerja Oh 0.015 45,000.00 - 675.00
Tukang kayu Oh 0.150 60,000.00 - 9,000.00
Kepala tukang kayu Oh 0.015 70,000.00 - 1,050.00
Mandor Oh 0.001 80,000.00 - 60.00
Jumlah 35,500.00 10,785.00 46,285.00
Keuntungan maksimal 10% 4,628.50
Jumlah 50,913.50
Dibulatkan 50,900.00
38 1 buah pasang kunci selot
Bahan:
Kunci selot Bh 1.000 21,500.00 21,500.00
Tenaga:
Pekerja Oh 0.020 45,000.00 900.00
Tukang kayu Oh 0.200 60,000.00 12,000.00
Kepala tukang kayu Oh 0.020 70,000.00 1,400.00
Mandor Oh 0.001 80,000.00 80.00
Jumlah 21,500.00 14,380.00 35,880.00
Keuntungan maksimal 10% 3,588.00
Jumlah 39,468.00
Dibulatkan 39,400.00
39 1 m² Pasang rangka atap genteng / kodok, kayu borneo.
Bahan:
Kayu borneo, balok M³ 0.012 2,750,000.00 33,000.00 -
Paku biasa 2" - 5" Kg 0.150 16,800.00 2,520.00 -
Tenaga:
Pekerja Oh 0.100 45,000.00 - 4,500.00
Tukang kayu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang kayu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.005 80,000.00 - 400.00
Mobilisasi Lot 0.050 35,520.00 1,776.00
Jumlah 35,520.00 13,376.00 48,896.00
Keuntungan maksimal 10% 4,889.60
Jumlah 53,785.60
Dibulatkan 53,700.00
40 1 m² Pasang atap genteng
Bahan:
Genteng Murando Glazuur Bh 14.400 6,500.00 93,600.00 -
Paku biasa 2" - 5" 0.03 0.030 16,800.00
Tenaga:
Pekerja Oh 0.150 45,000.00 - 6,750.00
Tukang kayu Oh 0.075 60,000.00 - 4,500.00
Kepala tukang kayu Oh 0.008 70,000.00 - 560.00
Mandor Oh 0.008 80,000.00 - 640.00
Mobilisasi Lot 0.050 93,600.00 4,680.00
Jumlah 93,600.00 17,130.00 110,730.00
Keuntungan maksimal 10% 11,073.00
Jumlah 121,803.00
Dibulatkan 121,800.00
41 1 m² Pasang atap genteng Metal
Bahan:
Genteng Metal lbr 1.020 70,000.00 71,400.00 -
Paku biasa 2" - 5" Kg 0.200 16,800.00
Tenaga:
Pekerja Oh 0.200 45,000.00 - 9,000.00
Tukang kayu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang kayu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.001 80,000.00 - 80.00
Mobilisasi Lot 0.050 93,600.00 4,680.00
Jumlah 71,400.00 20,460.00 91,860.00
Keuntungan maksimal 10% 9,186.00
Jumlah 101,046.00
Dibulatkan 101,000.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
42 1 m¹ Pasang bubung metal
Bahan:
Genteng bubung Murando Glazuur lbr 1.020 20,000.00 20,400.00 -
Semen portland Kg 8.000 1,250.00 10,000.00 -
Pasir pasang M³ 0.032 195,000.00 6,240.00 -
Tenaga:
Pekerja Oh 0.400 45,000.00 - 18,000.00
Tukang batu Oh 0.200 60,000.00 - 12,000.00
Kepala tukang batu Oh 0.020 70,000.00 - 1,400.00
Mandor Oh 0.002 80,000.00 - 160.00
Jumlah 36,640.00 31,560.00 68,200.00
Keuntungan maksimal 10% 6,820.00
Jumlah 75,020.00
Dibulatkan 75,000.00
43 1 m¹ Pasang bubung
Bahan:
Genteng bubung Murando Glazuur Bh 5.000 10,500.00 52,500.00 -
Semen portland Kg 8.000 1,250.00 10,000.00 -
Pasir pasang M³ 0.032 195,000.00 6,240.00 -
Tenaga:
Pekerja Oh 0.400 45,000.00 - 18,000.00
Tukang batu Oh 0.200 60,000.00 - 12,000.00
Kepala tukang batu Oh 0.020 70,000.00 - 1,400.00
Mandor Oh 0.002 80,000.00 - 160.00
Jumlah 68,740.00 31,560.00 100,300.00
Keuntungan maksimal 10% 10,030.00
Jumlah 110,330.00
Dibulatkan 110,300.00
44 1 m² Pasang rangka langit -langit ( 0.60 x 0.60 ) m, kayu borneo Super
Bahan:
Gypsum Board Lbr 0.364 - -
Kayu borneo Super, balok M³ 0.014 2,750,000.00 37,125.00
Paku biasa 2" - 5" Kg 0.100 16,800.00 1,680.00
Tenaga:
Pekerja Oh 0.070 45,000.00 - 3,150.00
Tukang kayu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang kayu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.004 80,000.00 - 280.00
Mobilisasi Lot 0.050 38,805.00 1,940.25
Jumlah 38,805.00 12,070.25 50,875.25
Keuntungan maksimal 10% 5,087.53
Jumlah 55,962.78
Dibulatkan 55,900.00
45 1 m² Pasang Penutup langit-langit Gypsum Board
Bahan:
Gypsum Board Lbr 0.364 89,500.00 32,578.00 -
Paku Sekrup Kg 0.110 35,000.00 3,850.00 -
Tenaga:
Pekerja Oh 0.100 45,000.00 - 4,500.00
Tukang kayu Oh 0.050 60,000.00 - 3,000.00
Kepala tukang kayu Oh 0.005 70,000.00 - 350.00
Mandor Oh 0.005 80,000.00 - 400.00
Mobilisasi Lot 0.050 36,428.00 1,821.40
Jumlah 36,428.00 10,071.40 46,499.40
Keuntungan maksimal 10% 4,649.94
Jumlah 51,149.34
Dibulatkan 51,100.00
46 1 m¹ Pasang list Plafond
Bahan:
List Profil Gypsum 8 cm m1 1.100 15,000.00 16,500.00 -
Paku Gypsum Kg 0.110 35,000.00 3,850.00
Alat Bantu ls 1.000 20,350.00
Tenaga:
Pekerja Oh 0.050 45,000.00 - 2,250.00
Tukang kayu Oh 0.050 60,000.00 - 3,000.00
Kepala tukang kayu Oh 0.005 70,000.00 - 350.00
Mandor Oh 0.003 80,000.00 - 240.00
Jumlah 20,350.00 5,840.00 26,190.00
Keuntungan maksimal 10% 2,619.00
Jumlah 28,809.00
Dibulatkan 28,800.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
47 1 m³ Pasang konstruksi kuda - kuda, kayu Kamper Medan
Bahan:
Kayu Kamper Medan, balok M³ 1.1000 5,450,000.00 5,995,000.00 -
Besi strip Kg 7.5000 2,800.00 21,000.00 -
Paku biasa 2" - 5" Kg 3.0000 16,800.00 50,400.00 -
Tenaga:
Pekerja Oh 2.0000 45,000.00 - 90,000.00
Tukang kayu Oh 6.0000 60,000.00 - 360,000.00
Kepala tukang kayu Oh 0.6000 70,000.00 - 42,000.00
Mandor Oh 0.1000 80,000.00 - 8,000.00
Mobilisasi Lot 0.0500 6,066,400.00 303,320.00
Jumlah 6,066,400.00 803,320.00 6,869,720.00
Keuntungan maksimal 10% 686,972.00
Jumlah 7,556,692.00
Dibulatkan 7,556,600.00
48 1 m' Pasang listplank ( 3 x 30 ) cm, kayu borneo.
Bahan:
Kayu borneo, papan M³ 0.011 2,750,000.00 30,250.00 -
Paku biasa 2" - 5" Kg 0.050 16,800.00 840.00 -
Tenaga:
Pekerja Oh 0.110 45,000.00 - 4,950.00
Tukang kayu Oh 0.220 60,000.00 - 13,200.00
Kepala tukang kayu Oh 0.022 70,000.00 - 1,540.00
Mandor Oh 0.005 80,000.00 - 400.00
Jumlah 31,090.00 20,090.00 51,180.00
Keuntungan maksimal 10% 5,118.00
Jumlah 56,298.00
Dibulatkan 56,200.00
49 1 m¹ Pasang talang datar, seng BJLS 28.
Bahan:
Seng plat 3' x 6', bjls. 28 Lbr 0.500 35,000.00 17,500.00 -
Paku biasa ½" - 1" Kg 0.015 20,000.00 300.00 -
Kayu borneo, papan M³ 0.010 2,750,000.00 26,400.00 -
Flintcoat / meni besi Kg 0.250 22,000.00 5,500.00 -
Tenaga:
Pekerja Oh 0.150 45,000.00 - 6,750.00
Tukang kayu Oh 0.400 60,000.00 - 24,000.00
Kepala tukang kayu Oh 0.025 70,000.00 - 1,750.00
Mandor Oh 0.001 80,000.00 - 100.00
Jumlah 49,700.00 32,600.00 82,300.00
Keuntungan maksimal 10% 8,230.00
Jumlah 90,530.00
Dibulatkan 90,500.00
50 1 m' Pasangan Fllasing Seng
Bahan:
Flasing genteng metal M1 1.000 -
Tenaga:
Pekerja Oh 0.400 45,000.00 18,000.00
Tukang kayu Oh 0.200 60,000.00 12,000.00
Kepala tukang kayu Oh 0.020 70,000.00 1,400.00
Mandor Oh 0.020 80,000.00 1,600.00
Jumlah - 33,000.00 33,000.00
Keuntungan maksimal 10% 3,300.00
Jumlah 36,300.00
Dibulatkan 36,300.00
51 1 m³ Membuat Lantai Kerja Beton Tumbuk 1 : 3 : 5
Bahan:
Semen portland Kg 10.000 1,250.00 12,500.00
Pasir beton M³ 0.026 205,000.00 5,330.00
Koral beton / split M³ 0.044 185,000.00 8,140.00
Tenaga:
Pekerja Oh 1.150 45,000.00 51,750.00
Tukang batu Oh 0.020 60,000.00 1,200.00
Kepala tukang batu Oh 0.002 70,000.00 140.00
Mandor Oh 0.006 80,000.00 480.00
Jumlah 25,970.00 53,570.00 79,540.00
Keuntungan maksimal 10% 7,954.00
Jumlah 87,494.00
Dibulatkan 87,400.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
52 1 m³ Membuat Rabat Beton Tumbuk 1 : 3 : 5
Bahan:
Semen portland Kg 218.000 1,250.00 272,500.00
Pasir beton M³ 0.520 205,000.00 106,600.00
Koral beton / split M³ 0.870 185,000.00 160,950.00
Tenaga:
Pekerja Oh 1.150 45,000.00 51,750.00
Tukang batu Oh 0.020 60,000.00 1,200.00
Kepala tukang batu Oh 0.002 70,000.00 140.00
Mandor Oh 0.006 80,000.00 480.00
Jumlah 540,050.00 53,570.00 593,620.00
Keuntungan maksimal 10% 59,362.00
Jumlah 652,982.00
Dibulatkan 652,900.00
53 1 m³ Membuat Beton Mutu K 175
Bahan:
Semen portland zak 6.8000 50,000.00 340,000.00
Pasir beton M³ 0.540 205,000.00 110,700.00
Koral beton / split M³ 0.830 185,000.00 153,550.00
Tenaga:
Pekerja Oh 1.500 45,000.00 67,500.00
Tukang batu Oh 0.500 60,000.00 30,000.00
Kepala tukang batu Oh 0.050 70,000.00 3,500.00
Mandor Oh 0.010 80,000.00 800.00
Mobilisasi Lot 0.050 604,250.00 30,212.50
Jumlah 604,250.00 132,012.50 736,262.50
Keuntungan maksimal 10% 73,626.25
Jumlah 809,888.75
Dibulatkan 809,800.00
54 1 m³ Membuat Beton Mutu Site Mix K 225
Bahan:
Semen portland zak 7.8960 50,000.00 394,800.00
Pasir beton M³ 0.650 205,000.00 133,250.00
Koral beton / split M³ 0.650 185,000.00 120,250.00
Tenaga:
Pekerja Oh 6.000 45,000.00 270,000.00
Tukang batu Oh 1.000 60,000.00 60,000.00
Kepala tukang batu Oh 0.100 70,000.00 7,000.00
Mandor Oh 0.300 80,000.00 24,000.00
Mobilisasi Lot 0.050 648,300.00 32,415.00
Jumlah 648,300.00 393,415.00 1,041,715.00
Keuntungan maksimal 10% 104,171.50
Jumlah 1,145,886.50
Dibulatkan 1,145,800.00
55 1 m³ Membuat beton tumbuk, 1 Pc. : 3 Ps. : 5 Kr.
Bahan:
Semen portland Kg 218.000 1,250.00 272,500.00 -
Pasir beton M³ 0.520 205,000.00 106,600.00 -
Koral beton / split M³ 0.870 185,000.00 160,950.00 -
Tenaga:
Pekerja Oh 1.650 45,000.00 - 74,250.00
Tukang batu Oh 0.250 60,000.00 - 15,000.00
Kepala tukang batu Oh 0.025 70,000.00 - 1,750.00
Mandor Oh 0.080 80,000.00 - 6,400.00
Mobilisasi Lot 0.050 540,050.00 27,002.50
Jumlah 540,050.00 124,402.50 664,452.50
Keuntungan maksimal 10% 66,445.25
Jumlah 730,897.75
Dibulatkan 730,800.00
56 1 m³ Membuat beton bertulang, 1 Pc. : 2 Ps. : 3 Kr.
Bahan:
Semen portland Kg 336.000 25.00 8,400.00 -
Pasir beton M³ 0.540 205,000.00 110,700.00 -
Koral beton / split M³ 0.810 185,000.00 149,850.00 -
Tenaga:
Pekerja Oh 2.000 45,000.00 - 90,000.00
Tukang batu Oh 0.350 60,000.00 - 21,000.00
Kepala tukang batu Oh 0.035 70,000.00 - 2,450.00
Mandor Oh 1.000 80,000.00 - 80,000.00
Mobilisasi Lot 0.100 268,950.00 26,895.00
Jumlah 268,950.00 220,345.00 489,295.00
Keuntungan maksimal 10% 48,929.50
Jumlah 538,224.50
Dibulatkan 538,200.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
56 1 Kg Pembesian dengan besi polos .
Bahan:
Besi beton polos Kg 1.050 9,000.00 9,450.00 -
Kawat beton Kg 0.015 25,000.00 375.00 -
Tenaga:
Pekerja Oh 0.025 45,000.00 - 1,125.00
Tukang besi Oh 0.015 60,000.00 - 900.00
Kepala tukang besi Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.005 80,000.00 - 400.00
Mobilisasi Lot 0.050 9,825.00 491.25
Jumlah 9,825.00 3,616.25 13,441.25
Keuntungan maksimal 10% 1,344.13
Jumlah 14,785.38
Dibulatkan 14,700.00
57 1 Kg Besi Beton Terpasang U. 39
Besi Beton rata-rata U 39 kg 1.050 10,000 10,500.00
Kawat beton kg 0.010 25,000 250.00
Tenaga:
Pekerja Oh 0.036 45,000 1,620.00
Tukang besi Oh 0.016 60,000 960.00
Kepala tukang besi Oh 0.011 70,000 770.00
Mandor Oh 0.005 80,000 400.00
Mobilisasi Lot 0.050 10,750 537.50
Keuntungan maksimal 10% 10,750.00 4,287.50 15,037.50
Jumlah 15,037.50
Dibulatkan 15,000.00
58 1 m² Pasang bekisting untuk sloof.
Bahan:
Kayu terentang / albasia M³ 0.045 650,000.00 29,250.00 -
Paku biasa 2" - 5" Kg 0.300 20,000.00 6,000.00 -
Minyak bekisting Lt 0.100 - -
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Tukang kayu Oh 0.260 70,000.00 - 18,200.00
Kepala tukang kayu Oh 0.026 70,000.00 - 1,820.00
Mandor Oh 0.005 80,000.00 - 400.00
Mobilisasi Lot 0.050 35,250.00 1,762.50
Jumlah 35,250.00 35,682.50 70,932.50
Keuntungan maksimal 10% 7,093.25
Jumlah 78,025.75
Dibulatkan 78,000.00
59 1 m² Pasang bekisting untuk kolom struktur
Bahan:
Kayu terentang / albasia M³ 0.040 650,000.00 26,000.00 -
Paku biasa 2" - 5" Kg 0.400 20,000.00 8,000.00 -
Minyak bekisting Lt 0.200 26,700.00 5,340.00 -
Kayu balok, borneo M³ 0.015 2,750,000.00 41,250.00 -
Plywood 9 mm Lbr 0.350 294,000.00 102,900.00 -
Dolken kayu alam Ø 8 - 10/400 Btg 2.000 35,000.00 70,000.00 -
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Tukang kayu Oh 0.330 70,000.00 - 23,100.00
Kepala tukang kayu Oh 0.033 70,000.00 - 2,310.00
Mandor Oh 0.006 80,000.00 - 480.00
Mobilisasi Lot 0.050 253,490.00 12,674.50
Jumlah 253,490.00 52,064.50 305,554.50
Keuntungan maksimal 10% 30,555.45
Jumlah 336,109.95
Dibulatkan 336,100.00
60 1 m² Pasang bekisting untuk kolom struktur biasa
Bahan:
Kayu terentang / albasia M³ 0.040 650,000.00 26,000.00 -
Paku biasa 2" - 5" Kg 0.400 20,000.00 8,000.00 -
Minyak bekisting Lt 0.200 - -
Kayu balok, borneo M³ 0.015 2,750,000.00 41,250.00 -
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Tukang kayu Oh 0.330 70,000.00 - 23,100.00
Kepala tukang kayu Oh 0.033 70,000.00 - 2,310.00
Mandor Oh 0.006 80,000.00 - 480.00
Mobilisasi Lot 0.050 75,250.00 3,762.50
Jumlah 75,250.00 43,152.50 118,402.50
Keuntungan maksimal 10% 11,840.25
Jumlah 130,242.75
Dibulatkan 130,200.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
61 1 m2 Bekisting Multiplek 9 mm
Kaso 5/7 B. super (2 x pakai) 50 % m3 0.0170 2,750,000 23,375.00
Multipleks 9 mm (2x Pakai) 75 % lbr 0.3470 186,200 48,458.55
paku kg 0.4000 6,800 2,720.00
Pekerja Oh 0.1200 45,000 5,400.00
Tukang kayu Oh 0.1500 60,000 9,000.00
Kep. Tukang Kayu Oh 0.1500 70,000 10,500.00
Mandor Oh 0.0500 80,000 4,000.00
Tk. kayu 1/2 trampil (bongkar cetakan) Oh 0.1200 27,000 3,240.00
Jumlah 28,906.00 74,560.55 103,466.55
Keuntungan maksimal 10% 10,346.66
Jumlah 113,813.21
Dibulatkan 113,800.00
62 1 m² Pasang bekisting untuk balok biasa
Bahan:
Kayu terentang / albasia M³ 0.040 650,000.00 26,000.00 -
Paku biasa 2" - 5" Kg 0.400 20,000.00 8,000.00 -
Minyak bekisting Lt 0.200 - -
Kayu balok, borneo M³ 0.018 2,750,000.00 49,500.00 -
Tenaga:
Pekerja Oh 0.320 45,000.00 - 14,400.00
Tukang kayu Oh 0.330 60,000.00 - 19,800.00
Kepala tukang kayu Oh 0.033 70,000.00 - 2,310.00
Mandor Oh 0.006 80,000.00 - 480.00
Mobilisasi Lot 0.050 27,000.00 1,350.00
Jumlah 83,500.00 38,340.00 121,840.00
Keuntungan maksimal 10% 12,184.00
Jumlah 134,024.00
Dibulatkan 134,000.00
63 1 m² Pasang bekisting untuk pondasi.
Bahan:
Kayu terentang / albasia M³ 0.040 650,000.00 26,000.00 -
Paku biasa 2" - 5" Kg 0.300 20,000.00 6,000.00 -
Minyak bekisting Lt 0.100 - - -
Tenaga:
Pekerja Oh 0.300 45,000.00 - 13,500.00
Tukang kayu Oh 0.260 60,000.00 - 15,600.00
Kepala tukang kayu Oh 0.026 70,000.00 - 1,820.00
Mandor Oh 0.005 80,000.00 - 400.00
Mobilisasi Lot 0.050 32,000.00 1,600.00
Jumlah 32,000.00 32,920.00 64,920.00
Keuntungan maksimal 10% 6,492.00
Jumlah 71,412.00
Dibulatkan 71,400.00
64 1 m² Pasang bekisting untuk lantai.
Bahan:
Kayu terentang / albasia M³ 0.040 650,000.00 26,000.00 -
Paku biasa 2" - 5" Kg 0.400 20,000.00 8,000.00 -
Minyak bekisting Lt 0.200 - -
Kayu balok, borneo M³ 0.015 2,750,000.00 41,250.00 -
Plywood 9 mm Lbr 0.350 - -
Dolken kayu galam Ø 8 - 10/400 Btg 6.000 10,000.00 60,000.00 -
Tenaga:
Pekerja Oh 0.320 45,000.00 - 14,400.00
Tukang kayu Oh 0.330 60,000.00 - 19,800.00
Kepala tukang kayu Oh 0.033 70,000.00 - 2,310.00
Mandor Oh 0.006 80,000.00 - 480.00
Mobilisasi Lot 0.050 135,250.00 6,762.50
Jumlah 135,250.00 43,752.50 179,002.50
Keuntungan maksimal 10% 17,900.25
Jumlah 196,902.75
Dibulatkan 196,900.00
65 1 M² Pasang bekisting untuk tangga.
Bahan:
Kayu terentang / albasia M³ 0.030 650,000.00 19,500.00 -
Paku biasa 2" - 5" Kg 0.400 20,000.00 8,000.00 -
Minyak bekisting Lt 0.150 - - -
Kayu balok, borneo M³ 0.020 2,750,000.00 55,000.00 -
Plywood 9 mm Lbr 0.350 - - -
Dolken kayu galam Ø 8 - 10/400 Btg 2.000 10,000.00 20,000.00 -
Tenaga:
Pekerja Oh 0.320 45,000.00 - 14,400.00
Tukang kayu Oh 0.330 60,000.00 - 19,800.00
Kepala tukang kayu Oh 0.033 70,000.00 - 2,310.00
Mandor Oh 0.006 80,000.00 - 480.00
Mobilisasi Lot 0.050 102,500.00 5,125.00
Jumlah 102,500.00 42,115.00 144,615.00
Keuntungan maksimal 10% 14,461.50
Jumlah 159,076.50
Dibulatkan 159,000.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
66 1 M1 pasangan saluran grevel 1/2 Ø 20 cm + pasangan
Galian tanah M³ 0.168 33,200.00 5,577.60 -
Urugan pasir M³ 0.018 286,000.00 5,205.20
Grevel beton 1/2 Ø 20 cm M1 1.000 15,000.00 15,000.00 -
Pasangan bata 1 pc : 5 ps M2 0.700 97,100.00 67,970.00 -
Plesteran 1 pc : 5 ps M2 0.800 62,600.00 - 50,080.00
Jumlah 93,752.80 50,080.00 143,832.80
Keuntungan maksimal 10% 14,383.28
Jumlah 158,216.08
Dibulatkan 158,200.00
67 1 M² Pasang dinding keramik warna, uk. 20 x 20 cm.
Bahan:
Keramik dinding warna, 20 x 20 cm Bh 25.000 3,400.00 85,000.00 -
Semen portland Kg 9.300 1,250.00 11,625.00 -
Pasir pasang M³ 0.042 195,000.00 8,190.00 -
Semen warna Kg 1.500 10,000.00 15,000.00 -
Tenaga:
Pekerja Oh 0.620 45,000.00 - 27,900.00
Tukang batu Oh 0.350 60,000.00 - 21,000.00
Kepala tukang batu Oh 0.035 70,000.00 - 2,450.00
Mandor Oh 0.030 80,000.00 - 2,400.00
Jumlah 119,815.00 53,750.00 173,565.00
Keuntungan maksimal 10% 17,356.50
Jumlah 190,921.50
Dibulatkan 190,900.00
68 1 M² Pasang lantai keramik non slip, uk. 20 x 20 cm.
Bahan:
Keramik lantai warna,20 x 20 cm Bh 25.000 3,360.00 84,000.00 -
Semen portland Kg 11.380 1,250.00 14,225.00 -
Pasir pasang M³ 0.042 195,000.00 8,190.00 -
Semen warna Kg 1.500 10,000.00 15,000.00 -
Tenaga:
Pekerja Oh 0.620 45,000.00 - 27,900.00
Tukang batu Oh 0.350 60,000.00 - 21,000.00
Kepala tukang batu Oh 0.035 70,000.00 - 2,450.00
Mandor Oh 0.030 80,000.00 - 2,400.00
Jumlah 121,415.00 53,750.00 175,165.00
Keuntungan maksimal 10% 17,516.50
Jumlah 192,681.50
Dibulatkan 192,600.00
69 1 M² Pasang lantai keramik, uk. 40 x 40 cm.
Bahan:
Keramik lantai 40 x 40 cm Bh 6.250 31,200.00 195,000.00 -
Semen portland Kg 11.380 1,250.00 14,225.00 -
Pasir pasang M³ 0.042 195,000.00 8,190.00 -
Semen warna Kg 1.000 10,000.00 10,000.00 -
Tenaga:
Pekerja Oh 0.620 45,000.00 - 27,900.00
Tukang batu Oh 0.350 60,000.00 - 21,000.00
Kepala tukang batu Oh 0.035 70,000.00 - 2,450.00
Mandor Oh 0.030 80,000.00 - 2,400.00
Jumlah 227,415.00 53,750.00 281,165.00
Keuntungan maksimal 10% 28,116.50
Jumlah 309,281.50
Dibulatkan 309,200.00
70 1 M² Pasang lantai keramik, uk. 30 x 30 cm.
Bahan:
Keramik lantai 30 x 30 cm Bh 11.870 3,791.07 45,000.00 -
Semen portland Kg 11.380 1,250.00 14,225.00 -
Pasir pasang M³ 0.042 195,000.00 8,190.00 -
Semen warna Kg 1.500 10,000.00 15,000.00 -
Tenaga:
Pekerja Oh 0.620 45,000.00 - 27,900.00
Tukang batu Oh 0.350 60,000.00 - 21,000.00
Kepala tukang batu Oh 0.035 70,000.00 - 2,450.00
Mandor Oh 0.030 80,000.00 - 2,400.00
Jumlah 82,415.00 53,750.00 136,165.00
Keuntungan maksimal 10% 13,616.50
Jumlah 149,781.50
Dibulatkan 149,700.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
71 1 M² Pasang Plint keramik, uk. 10 x 40 cm.
Bahan:
Keramik 10 x 40 cm Bh 25.000 2,800.00 70,000.00 -
Semen portland Kg 1.200 1,250.00 1,500.00 -
Pasir pasang M³ 0.003 195,000.00 585.00 -
Semen warna Kg 0.100 10,000.00 1,000.00 -
Tenaga:
Pekerja Oh 0.080 45,000.00 - 3,600.00
Tukang batu Oh 0.030 60,000.00 - 1,800.00
Kepala tukang batu Oh 0.004 70,000.00 - 280.00
Mandor Oh 0.004 80,000.00 - 320.00
Jumlah 73,085.00 6,000.00 79,085.00
Keuntungan maksimal 10% 7,908.50
Jumlah 86,993.50
Dibulatkan 86,900.00
72 Memasang 1 buah floor drain.
Bahan:
Floor drain Bh 1.000 12,500.00 12,500.00 -
Tenaga:
Pekerja Oh 0.010 45,000.00 - 450.00
Tukang batu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang batu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.005 80,000.00 - 400.00
Jumlah 12,500.00 7,550.00 20,050.00
Keuntungan maksimal 10% 2,005.00
Jumlah 22,055.00
Dibulatkan 22,000.00
73 Memasang 1 buah kran air, Ø ½" atau Ø ¾"
Bahan:
Kran air Bh 1.000 39,800.00 39,800.00 -
Seal tape Bh 0.025 3,500.00 87.50 -
Tenaga:
Pekerja Oh 0.010 45,000.00 - 450.00
Tukang batu Oh 0.100 60,000.00 - 6,000.00
Kepala tukang batu Oh 0.010 70,000.00 - 700.00
Mandor Oh 0.005 80,000.00 - 400.00
Jumlah 39,887.50 7,550.00 47,437.50
Keuntungan maksimal 10% 4,743.75
Jumlah 52,181.25
Dibulatkan 52,100.00
74 1 m² Mendempul dan menggosok bidang kayu.
Bahan:
Dempul jadi / plamuur Kg 0.080 20,500.00 1,640.00 -
Minyak cat Ltr 0.020 - -
Batu apung Kg 0.010 - -
Kape kayu Bh 0.005 -
Tenaga:
Pekerja Oh 0.040 45,000.00 - 1,800.00
Tukang cat Oh 0.040 60,000.00 - 2,400.00
Kepala tukang cat Oh 0.004 70,000.00 - 280.00
Mandor Oh 0.003 80,000.00 - 200.00
Jumlah 1,640.00 4,680.00 6,320.00
Keuntungan maksimal 10% 632.00
Jumlah 6,952.00
Dibulatkan 6,900.00
75 1 m² Mendempul dan menggosok bidang tembok.
Bahan:
Plamuur tembok Kg 0.080 13,500.00 1,080.00 -
Kertas amplas Lbr 0.050 10,600.00 530.00 -
Kape tembok Bh 0.005 7,500.00 37.50 -
Tenaga:
Pekerja Oh 0.040 45,000.00 - 1,800.00
Tukang cat Oh 0.040 60,000.00 - 2,400.00
Kepala tukang cat Oh 0.004 70,000.00 - 280.00
Mandor Oh 0.003 80,000.00 - 200.00
Jumlah 1,647.50 4,680.00 6,327.50
Keuntungan maksimal 10% 632.75
Jumlah 6,960.25
Dibulatkan 6,900.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
76 1 m² Pengecatan bidang kayu lama.
Bahan:
Plamuur kayu Kg 0.150 20,500.00 3,075.00 -
Cat dasar Kg 0.170 - - -
Cat penutup Kg 0.170 40,000.00 6,800.00 -
Kertas amplas Lbr 0.010 10,600.00 106.00 -
Kwas 3" Bh 0.050 10,000.00 500.00 -
Tenaga:
Pekerja Oh 0.070 45,000.00 - 3,150.00
Tukang cat Oh 0.075 60,000.00 - 4,500.00
Kepala tukang cat Oh 0.008 70,000.00 - 525.00
Mandor Oh 0.003 80,000.00 - 200.00
Jumlah 10,481.00 8,375.00 18,856.00
Keuntungan maksimal 10% 1,885.60
Jumlah 20,741.60
Dibulatkan 20,700.00
77 1 m² Pengecatan bidang kayu baru.
Bahan:
Meni kayu Kg 0.200 22,000.00 4,400.00 -
Plamir kayu Kg 0.150 20,500.00 3,075.00 -
Cat dasar Kg 0.170 - - -
Cat penutup 2 kali Kg 0.260 40,000.00 10,400.00 -
Kertas amplas Lbr 0.010 10,600.00 106.00 -
Kwas 3" Bh 0.050 10,000.00 500.00 -
Tenaga:
Pekerja Oh 0.070 45,000.00 - 3,150.00
Tukang cat Oh 0.009 60,000.00 - 540.00
Kepala tukang cat Oh 0.006 70,000.00 - 420.00
Mandor Oh 0.003 80,000.00 - 200.00
Jumlah 18,481.00 4,310.00 22,791.00
Keuntungan maksimal 10% 2,279.10
Jumlah 25,070.10
Dibulatkan 25,000.00
78 1 m² Pelaburan bidang kayu dengan politur.
Bahan:
Politur Ltr 0.150 25,000.00 3,750.00 -
Politur jadi Ltr 0.372 - -
Kertas amplas Lbr 0.150 - -
Kwas 3" Bh 0.010 - -
Tenaga:
Tukang cat Oh 0.060 60,000.00 - 3,600.00
Kepala tukang cat Oh 0.016 70,000.00 - 1,120.00
Mandor Oh 0.003 80,000.00 - 200.00
Jumlah 3,750.00 4,920.00 8,670.00
Keuntungan maksimal 10% 867.00
Jumlah 9,537.00
Dibulatkan 9,500.00
79 1 m² Pelaburan bidang kayu dengan cat residu.
Bahan:
Residu Ltr 0.350 - -
Tenaga:
Pekerja Oh 0.100 45,000.00 - 4,500.00
Mandor Oh 0.006 80,000.00 - 480.00
Jumlah - 4,980.00 4,980.00
Keuntungan maksimal 10% 498.00
Jumlah 5,478.00
Dibulatkan 5,400.00
80 1 M2 Pengecatan Plafond dengan Sanlek ( 3 X )
Cat Tembok Sanlex kg 0.2000 16,000 3,200.00
Plamir Tembok kg 0.1600 13,500 2,160.00
Rol Cat bh 0.0100 27,500 275.00
Hampelas lbr 0.5000 10,600 5,300.00
Pekerja Oh 0.1040 45,000 4,680.00
Tukang cat Oh 0.1820 60,000 10,920.00
Kepala tukang cat Oh 0.0195 70,000 1,365.00
Mandor Oh 0.0100 80,000 800.00
Steger Werk lot 0.1000 17,765 1,776.50
Jumlah 10,935.00 19,541.50 30,476.50
Keuntungan maksimal 10% 3,047.65
Jumlah 33,524.15
Dibulatkan 33,500.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
81 1 m² Zincromate Baja
Bahan:
Zincromate Kg 0.100 30,000.00 3,000.00 -
Kuas Bh 0.010 10,000.00 100.00
Tenaga:
Pekerja Oh 0.100 45,000.00 - 4,500.00
Mandor Oh 0.006 80,000.00 - 480.00
Jumlah 3,100.00 4,980.00 8,080.00
Keuntungan maksimal 10% 808.00
Jumlah 8,888.00
Dibulatkan 8,800.00
82 1 m² Pengecatan bidang tembok baru.
Bahan:
Cat dasar Kg 0.100 30,000.00 3,000.00 -
Cat penutup 2 kali Kg 0.260 16,000.00 4,160.00 -
Kertas amplas Lbr 0.100 10,600.00 1,060.00 -
Roll cat Bh 0.025 27,500.00 687.50 -
Tenaga:
Pekerja Oh 0.020 45,000.00 - 900.00
Tukang cat Oh 0.063 60,000.00 - 3,780.00
Kepala tukang cat Oh 0.006 70,000.00 - 441.00
Mandor Oh 0.003 80,000.00 - 200.00
Jumlah 8,907.50 5,321.00 14,228.50
Keuntungan maksimal 10% 1,422.85
Jumlah 15,651.35
Dibulatkan 15,600.00
83 1 m² Pengecatan bidang tembok baru + Pendempulan.
Pendempulan M2 1.000 6,900.00 6,900.00
Pengecatan M2 1.000 15,600.00 15,600.00
Jumlah 22,500.00
84 1 m² Pelaburan bidang kayu dengan politur.
Pendempulan M2 1.000 6,900.00 6,900.00
Plituran kayu M2 1.000 9,500.00 9,500.00
Jumlah 16,400.00
85 1 m² Pengecatan bidang kayu baru + Pendempulan
Pendempulan M2 1.000 6,900.00 6,900.00
Pengecatan bidang kayu M2 1.000 25,000.00 25,000.00
Jumlah 31,900.00
86 1 M3 Pek. Beton Sloof 15/25
Adukan beton Mutu K 175 M3 1.000 809,800.00 809,800.00
Tulangan beton besi U-24 kg 184.500 9,000.00 1,660,500.00
Bekisting papan M2 13.332 0.50 70,932.50 472,836.05
Jumlah 2,943,136.05
Keuntungan maksimal 10% 294,313.60
Jumlah 3,237,449.65
Dibulatkan 3,237,000.00
87 1 M3 Pek. Beton Sloof 20/40,
Adukan beton Mutu K 250 M3 1.000 1,145,800.00 1,145,800.00
Tulangan beton besi U-32 kg 171.643 10,000.00 1,716,428.57
Bekisting papan M2 13.332 0.50 70,932.50 472,836.05
Jumlah 3,335,064.62
Keuntungan maksimal 10% 333,506.46
Jumlah 3,668,571.08
Dibulatkan 3,668,000.00
88 1 M3 Pek. Beton Sloof 15/25
Adukan beton Mutu K 225 M3 1.000 1,145,800.00 1,145,800.00 1,145,800.00
Tulangan beton besi U-24 kg 213.333 9,000.00 1,920,000.00 14,700.00 1,934,700.00
Bekisting papan M2 13.333 0.50 78,000.00 520,000.00
Jumlah 3,600,500.00
Keuntungan maksimal 10% 360,050.00
Jumlah 3,960,550.00
Dibulatkan 3,960,000.00
Harga Jumlah Harga Jumlah Harga
No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
89 1 M3 Pek. Beton Kolom 15/15
Adukan beton Mutu K 225 M3 1.000 1,145,800.00 1,145,800.00
Tulangan beton besi U-24 kg 139.556 9,000.00 1,256,000.00 14,700.00 1,270,700.00
Bekisting papan M2 13.333 0.50 130,200.00 868,000.00
Jumlah 3,284,500.00
Keuntungan maksimal 10% 328,450.00
Jumlah 3,612,950.00
Dibulatkan 3,612,000.00
90 1 M3 Pek. Beton Kolom 15/25
Adukan beton Mutu K 225 M3 1.000 1,145,800.00 1,145,800.00
Tulangan beton besi U-24 kg 165.867 9,000.00 1,492,800.00 14,700.00 1,507,500.00
Bekisting papan M2 10.667 0.50 130,200.00 694,400.00
Jumlah 3,347,700.00
Keuntungan maksimal 10% 334,770.00
Jumlah 3,682,470.00
Dibulatkan 3,682,000.00
91 1 M3 Pek. Beton Kolom 25/25
Adukan beton Mutu K 225 M3 1.000 1,145,800.00 1,145,800.00
Tulangan beton besi U-24 kg 184.000 9,000.00 1,656,000.00 14,700.00 1,670,700.00
Bekisting papan M2 8.000 0.50 130,200.00 520,800.00
Jumlah 3,337,300.00
Keuntungan maksimal 10% 333,730.00
Jumlah 3,671,030.00
Dibulatkan 3,671,000.00
92 1 M3 Pek. Beton Ringbalk 15/15
Adukan beton Mutu K 225 M3 1.000 1,145,800.00 1,145,800.00
Tulangan beton besi U-24 kg 139.556 9,000.00 1,256,000.00 14,700.00 1,270,700.00
Bekisting papan M2 13.333 0.50 134,000.00 893,333.33
Jumlah 3,309,833.33
Keuntungan maksimal 10% 330,983.33
Jumlah 3,640,816.67
Dibulatkan 3,640,000.00

93 1 M3 Pek. Beton Balok 15/25


Adukan beton Mutu K 225 M3 1.000 1,145,800.00 1,145,800.00
Tulangan beton besi U-24 kg 165.867 9,000.00 1,492,800.00 14,700.00 1,507,500.00
Bekisting papan M2 10.667 0.50 134,000.00 714,666.67
Jumlah 3,367,966.67
Keuntungan maksimal 10% 336,796.67
Jumlah 3,704,763.33
Dibulatkan 3,704,000.00
93 1 M3 Pek. Beton Ringbalk 15/15,
Adukan beton Ready Mix Mutu K 225 m3 1.00 1,145,800.00 1,145,800.00
Besi Beton U. 24 kg 139.56 9,000.00 1,256,000.00
Bekisting m2 13.33 0.50 121,840.00 812,266.67
Stoot werk m2 2.22 0.50 134,000.00 148,888.89
Jumlah 3,362,955.56
Keuntungan maksimal 10% 336,295.56
Jumlah 3,699,251.11
Dibulatkan 3,699,000.00
94 1 M3 Pek. Balok Induk 30/45 CM, Portal 1 (B-C) (TUL. 8 O 16 SK. 10 - 15-25)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 116.15 10,000.00 1,161,481.48
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 - 0.50 200,800.00 223,111.11
Jumlah 3,632,203.70
Keuntungan maksimal 10% 363,220.37
Jumlah 3,995,424.07
Dibulatkan 3,995,000.00
95 1 M3 Pek. Balok Induk 30/45 CM, Portal 2 (B-C)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 104.67 10,000.00 1,046,670.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 - 0.50 200,800.00 223,111.11
Jumlah 3,517,392.22
Keuntungan maksimal 10% 351,739.22
Jumlah 3,869,131.44
Dibulatkan 3,869,000.00

96 1 M3 Pek. Balok Induk 30/45 CM, Portal 2 (C-D)


Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 128.07 10,000.00 1,280,740.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 - 0.50 200,800.00 223,111.11
Jumlah 3,751,462.22
Keuntungan maksimal 10% 375,146.22
Jumlah 4,126,608.44
Dibulatkan 4,126,000.00
Harga Jumlah Harga Jumlah Harga
No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
97 1 M3 Pek. Balok Induk 30/45 CM, portal 3 (B-D)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 116.37 10,000.00 1,163,700.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 0.50 200,800.00 223,111.11
Jumlah 3,634,422.22
Keuntungan maksimal 10% 363,442.22
Jumlah 3,997,864.44
Dibulatkan 3,997,000.00
98 1 M3 Pek. Balok Anak 20/30 CM,
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 24 kg 226.89 10,000.00 2,268,888.89
Bekisting Multipleks 9 mm m2 12.50 134,000.00 1,675,000.00
Stoot werk m2 2.50 - 0.50 200,800.00 251,000.00
Jumlah 5,251,388.89
Keuntungan maksimal 10% 525,138.89
Jumlah 5,776,527.78
Dibulatkan 5,776,000.00
99 1 M3 Pek. Balok Induk 30/45 CM, Portal 4 (B-C) (D-E)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 116.37 10,000.00 1,163,700.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 - 0.50 200,800.00 223,111.11
Jumlah 3,634,422.22
Keuntungan maksimal 10% 363,442.22
Jumlah 3,997,864.44
Dibulatkan 3,997,000.00
100 1 M3 Pek. Balok Induk 30/45 CM, Portal 5 (B-D)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 104.67 10,000.00 1,046,670.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 16,300.00 0.50 200,800.00 223,111.11
Jumlah 3,517,392.22
Keuntungan maksimal 10% 351,739.22
Jumlah 3,869,131.44
Dibulatkan 3,869,000.00
101 1 M3 Pek. Balok Induk 30/45 CM, Portal 5 (D-E)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 174.89 10,000.00 1,748,890.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 - 0.50 200,800.00 223,111.11
Jumlah 4,219,612.22
Keuntungan maksimal 10% 421,961.22
Jumlah 4,641,573.44
Dibulatkan 4,641,000.00
102 1 M3 Pek. Balok Induk 30/45 CM, Portal 5 (E-F)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 128.07 10,000.00 1,280,740.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 - 0.50 200,800.00 223,111.11
Jumlah 3,751,462.22
Keuntungan maksimal 10% 375,146.22
Jumlah 4,126,608.44
Dibulatkan 4,126,000.00
103 1 M3 Pek. Balok Induk 30/45 CM, Portal 6 (B-D)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 128.07 10,000.00 1,280,740.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 - 0.50 200,800.00 223,111.11
Jumlah 3,751,462.22
Keuntungan maksimal 10% 375,146.22
Jumlah 4,126,608.44
Dibulatkan 4,126,000.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
104 1 M3 Pek. Balok Induk 30/45 CM, Portal 6 (D-E)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 151.48 10,000.00 1,514,810.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 - 0.50 200,800.00 223,111.11
Jumlah 3,985,532.22
Keuntungan maksimal 10% 398,553.22
Jumlah 4,384,085.44
Dibulatkan 4,384,000.00
105 1 M3 Pek. Balok Induk 30/45 CM, Portal 6 (E-F)
Adukan beton Ready Mix Mutu K 250 m3 1.00 1,056,500.00 1,056,500.00
Besi Beton U. 32 kg 81.93 10,000.00 819,260.00
Bekisting m2 8.89 134,000.00 1,191,111.11
Stoot werk m2 2.22 - 0.50 200,800.00 223,111.11
Jumlah 3,289,982.22
Keuntungan maksimal 10% 328,998.22
Jumlah 3,618,980.44
Dibulatkan 3,618,000.00
106 1 M3 Pek. Balok Induk 30/45 CM, Portal 1-2 (B)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 81.259 7,500.00 609,444.44
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 - - -
Jumlah 1,538,388.89
Keuntungan maksimal 10% 153,838.89
Jumlah 1,692,227.78
Dibulatkan 1,692,000.00
107 Balok Induk 30/45 cm Portal 2-3, 3-4, 4-5, 5-6 (B)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 92.963 7,500.00 697,222.22
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 - - -
Jumlah 1,626,166.67
Keuntungan maksimal 10% 162,616.67
Jumlah 1,788,783.33
Dibulatkan 1,788,000.00
108 Balok Induk 30/45 cm Portal 2-3, 3-4 (D)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 116.370 7,500.00 872,777.78
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 - - -
Jumlah 1,801,722.22
Keuntungan maksimal 10% 180,172.22
Jumlah 1,981,894.44
Dibulatkan 1,981,000.00
109 Balok Induk 30/45 cm Portal 4-5, 5-6 (D)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 128.074 7,500.00 960,555.56
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 -
Jumlah 1,889,500.00
Keuntungan maksimal 10% 188,950.00
Jumlah 2,078,450.00
Dibulatkan 2,078,000.00
110 Balok Induk 30/45 cm Portal 2-3, (E)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 139.778 7,500.00 1,048,333.33
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 - - -
Jumlah 1,977,277.78
Keuntungan maksimal 10% 197,727.78
Jumlah 2,175,005.56
Dibulatkan 2,175,000.00
111 Balok Induk 30/45 cm Portal 3-4, (E)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 116.370 7,500.00 872,777.78
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 - - -
Jumlah 1,801,722.22
Keuntungan maksimal 10% 180,172.22
Jumlah 1,981,894.44
Dibulatkan 1,981,000.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
112 Balok Induk 30/45 cm Portal 4-5, (E)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 186.593 7,500.00 1,399,444.44
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 - - -
Jumlah 2,328,388.89
Keuntungan maksimal 10% 232,838.89
Jumlah 2,561,227.78
Dibulatkan 2,561,000.00
113 Balok Induk 30/45 cm Portal 5-6, (E)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 139.778 7,500.00 1,048,333.33
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 - - -
Jumlah 1,977,277.78
Keuntungan maksimal 10% 197,727.78
Jumlah 2,175,005.56
Dibulatkan 2,175,000.00
114 Balok Induk 30/45 cm Portal 4-5, (F)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 174.889 7,500.00 1,311,666.67
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 - - -
Jumlah 2,240,611.11
Keuntungan maksimal 10% 224,061.11
Jumlah 2,464,672.22
Dibulatkan 2,464,000.00
115 Balok Induk 30/45 cm Portal 5-6, (F)
Adukan beton Ready Mix Mutu K 250 m3 1.000 532,500.00 532,500.00
Besi Beton U. 32 kg 128.074 7,500.00 960,555.56
Bekisting m2 8.889 44,600.00 396,444.44
Stoot werk m2 2.222 - - -
Jumlah 1,889,500.00
Keuntungan maksimal 10% 188,950.00
Jumlah 2,078,450.00
Dibulatkan 2,078,000.00
116 Kolom Ampig 15/25 cm,
Adukan beton Mutu K 175 m3 1.000 545,500.00 545,500.00
Besi Beton U. 24 kg 282.133 5,400.00 1,523,520.00
Bekisting Papan m2 12.500 45,400.00 567,500.00
Jumlah 2,636,520.00
Keuntungan maksimal 10% 263,652.00
Jumlah 2,900,172.00
Dibulatkan 2,900,000.00
117 1 M3 Pek. Balok 15/25 CM
Adukan beton Ready Mix Mutu K 225 m3 1.00 970,500.00 970,500.00
Besi Beton U. 24 kg 95.08 10,000.00 950,833.33
Bekisting Multipleks 9 mm m2 12.50 134,000.00 1,675,000.00
Stoot werk m2 2.50 - 0.50 200,800.00 251,000.00
Jumlah 3,847,333.33
Keuntungan maksimal 10% 384,733.33
Jumlah 4,232,066.67
Dibulatkan 4,232,000.00
118 1 M3 Pek. Balok 15/35 CM,
Adukan beton Ready Mix Mutu K 250 m3 1.00 970,500.00 970,500.00
Besi Beton U. 32 kg 104.95 10,000.00 1,049,523.81
Bekisting Multipleks 9 mm m2 12.50 134,000.00 1,675,000.00
Stoot werk m2 2.50 - 0.50 200,800.00 251,000.00
Jumlah 3,946,023.81
Keuntungan maksimal 10% 394,602.38
Jumlah 4,340,626.19
Dibulatkan 4,340,000.00
119 1 M3 Pek. Balok 15/30 cm
Adukan beton Ready Mix Mutu K 250 m3 1.00 970,500.00 970,500.00
Besi Beton U. 32 kg 104.95 10,000.00 1,049,523.81
Bekisting Multipleks 9 mm m2 12.50 134,000.00 1,675,000.00
Stoot werk m2 2.50 - 0.50 200,800.00 251,000.00
Jumlah 3,946,023.81
Keuntungan maksimal 10% 394,602.38
Jumlah 4,340,626.19
Dibulatkan 4,340,000.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
120 1 M3 Pek. Balok Tangga 20/40 cm
Adukan beton Ready Mix Mutu K 250 m3 1.00 970,500.00 970,500.00
Besi Beton U. 32 kg 124.75 10,000.00 1,247,500.00
Bekisting Papan m2 12.50 134,000.00 1,675,000.00
Jumlah 3,893,000.00
Keuntungan maksimal 10% 389,300.00
Jumlah 4,282,300.00
Dibulatkan 4,282,000.00
121 1 M3 Pek. Balok Ampig 15/20 cm
Adukan beton Mutu K 175 m3 1.00 809,800.00 809,800.00
Besi Beton U. 24 kg 215.11 9,000.00 1,936,000.00
Bekisting Papan m2 12.50 134,000.00 1,675,000.00
Jumlah 4,420,800.00
Keuntungan maksimal 10% 442,080.00
Jumlah 4,862,880.00
Dibulatkan 4,862,000.00
122 1 M3 Pek. Balok Ampig 15/15 cm
Adukan beton Mutu K 175 m3 1.00 809,800.00 809,800.00
Besi Beton U. 24 kg 268.44 9,000.00 2,416,000.00
Bekisting Papan m2 12.50 134,000.00 1,675,000.00
Jumlah 4,900,800.00
Keuntungan maksimal 10% 490,080.00
Jumlah 5,390,880.00
Dibulatkan 5,390,000.00
123 1 M3 Pek. Kolom Ampig 15/15 cm
Adukan beton Mutu K 175 m3 1.00 809,800.00 809,800.00
Besi Beton U. 24 kg 268.44 9,000.00 2,416,000.00
Bekisting Papan m2 12.50 134,000.00 1,675,000.00
Jumlah 4,900,800.00
Keuntungan maksimal 10% 490,080.00
Jumlah 5,390,880.00
Dibulatkan 5,390,000.00
124 1 M3 Pek.Beton Lintel 12/12, Tul =
Adukan beton Mutu K 175 M3 1.000 809,800.00 - 809,800.00
Tulangan beton besi U-24 kg 224.222 10,000.00 14,700.00 2,242,222.22
Bekisting papan M2 25.000 0.50 200,800.00 2,510,000.00
Jumlah 5,562,022.22
Keuntungan maksimal 10% 11,124,044.44
Jumlah 1,112,404.44
Dibulatkan 12,236,448.89
125 1 M3 Pek.Beton Plat lantai ,T.12cm
Adukan beton Site Mix Mutu K 225 M3 1.000 1,145,800.00 1,145,800.00
Tulangan beton besi U-24 kg 130.000 9,000.00 1,170,000.00 14,700.00 1,184,700.00
Bekisting Papan M2 8.333 0.50 196,900.00 820,416.67
Stoot werk M2 8.333 0.50 200,800.00 836,666.67
Jumlah 3,987,583.33
Keuntungan maksimal 10% 398,758.33
Jumlah 4,386,341.67
Dibulatkan 4,386,300.00
126 1 M3 Pek. Beton Cantilever T. 10 CM
Beton Site Mix Mix K- 225 m3 1.0000 1,145,800 1,145,800.00
Besi Beton U. 24 kg 62.4000 9,000 561,600.00 14,700.00 576,300.00
Bekisting Papan m2 10.0000 0.50 196,900.00 984,500.00
Stoot werk m2 10.0000 0.50 200,800.00 1,004,000.00
Jumlah 3,710,600.00
Keuntungan Maksimal 371,060.00
Jumlah Harga 4,081,660.00
Dibulatkan 4,081,600.00
127 1 M3 Pek.Beton Plat Tangga
Adukan beton Ready Mix Mutu K 250 M3 1.000 1,145,800.00 1,145,800.00
Tulangan beton besi U-32 kg 181.778 9,000.00 1,636,000.00
Bekisting papan M2 6.667 0.50 159,000.00 530,000.00
Jumlah 3,311,800.00
Keuntungan maksimal 10% 331,180.00
Jumlah 3,642,980.00
Dibulatkan 3,642,900.00
128 Memasang 1 M1 pipa Stainless Dia 3'
Bahan
Pipa Stainless M1 1.200 16,500.00 19,800.00 -
Ongkos Pasang 15% ls 1.000 2,970.00 - 2,970.00
Jumlah 19,800.00 2,970.00 22,770.00
Keuntungan maksimal 10% 2,277.00
Jumlah 25,047.00
Dibulatkan 25,000.00
129 Memasang 1 M1 pipa Stainless Dia 2'
Bahan
Pipa Stainless M1 1.200 65,000.00 78,000.00 -
Ongkos Pasang 15% ls 1.000 11,700.00 - 11,700.00
Jumlah 78,000.00 11,700.00 89,700.00
Keuntungan maksimal 10% 8,970.00
Jumlah 98,670.00
Dibulatkan 98,600.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
130 Memasang 1 M1 pipa Stainless Dia 1'
Bahan
Pipa Stainless M1 1.200 5,500.00 6,600.00 -
Ongkos Pasang 15% ls 1.000 990.00 - 990.00
Jumlah 6,600.00 990.00 7,590.00
Keuntungan maksimal 10% 759.00
Jumlah 8,349.00
Dibulatkan 8,300.00
131 Memasang 1 M1 pipa PVC tipe AW diameter 1/2"
Bahan
- Pipa PVC M1 1.200 4,375.00 5,250.00 -
- Perlengkapan harga pipa 0.350 4,375.00 1,531.25 -
Tenaga
- Pekerja Oh 0.036 45,000.00 - 1,620.00
- Tukang batu Oh 0.060 60,000.00 - 3,600.00
- Kepala tukang Oh 0.006 70,000.00 - 420.00
- Mandor Oh 0.002 80,000.00 - 144.00
Jumlah 6,781.25 5,784.00 12,565.25
Keuntungan maksimal 10% 1,256.53
Jumlah 13,821.78
Dibulatkan 13,800.00
132 Memasang 1 M1 pipa PVC tipe AW diameter 3/4"
Bahan
- Pipa PVC M1 1.200 7,333.33 8,800.00 -
- Perlengkapan harga pipa 0.350 7,333.33 2,566.67 -
Tenaga
- Pekerja Oh 0.036 45,000.00 - 1,620.00
- Tukang batu Oh 0.060 60,000.00 - 3,600.00
- Kepala tukang Oh 0.006 70,000.00 - 420.00
- Mandor Oh 0.002 80,000.00 - 144.00
Jumlah 11,366.67 5,784.00 17,150.67
Keuntungan maksimal 10% 1,715.07
Jumlah 18,865.73
Dibulatkan 18,800.00
133 Memasang 1 M1 pipa PVC tipe AW diameter 1"
Bahan
- Pipa PVC M1 1.200 10,000.00 12,000.00 -
- Perlengkapan harga pipa 0.350 10,000.00 3,500.00 -
Tenaga
- Pekerja Oh 0.036 45,000.00 - 1,620.00
- Tukang batu Oh 0.060 60,000.00 - 3,600.00
- Kepala tukang Oh 0.006 70,000.00 - 420.00
- Mandor Oh 0.002 80,000.00 - 144.00
Jumlah 15,500.00 5,784.00 21,284.00
Keuntungan maksimal 10% 2,128.40
Jumlah 23,412.40
Dibulatkan 23,400.00
134 Memasang 1 M1 pipa PVC tipe AW diameter 1 1/2 "
Bahan
- Pipa PVC M1 1.200 18,333.33 22,000.00 -
- Perlengkapan harga pipa 0.350 18,333.33 6,416.67 -
Tenaga
- Pekerja Oh 0.036 45,000.00 - 1,620.00
- Tukang batu Oh 0.060 60,000.00 - 3,600.00
- Kepala tukang Oh 0.006 70,000.00 - 420.00
- Mandor Oh 0.002 80,000.00 - 144.00
Jumlah 28,416.67 5,784.00 34,200.67
Keuntungan maksimal 10% 3,420.07
Jumlah 37,620.73
Dibulatkan 37,600.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
135 Memasang 1 M1 pipa PVC tipe AW diameter 2 "
Bahan
- Pipa PVC M1 1.200 21,666.67 26,000.00 -
- Perlengkapan harga pipa 0.350 21,666.67 7,583.33 -
Tenaga
- Pekerja Oh 0.054 45,000.00 - 2,430.00
- Tukang batu Oh 0.090 60,000.00 - 5,400.00
- Kepala tukang Oh 0.009 70,000.00 - 630.00
- Mandor Oh 0.003 80,000.00 - 216.00
Jumlah 33,583.33 8,676.00 42,259.33
Keuntungan maksimal 10% 4,225.93
Jumlah 46,485.27
Dibulatkan 46,400.00
136 Memasang 1 M1 pipa PVC tipe AW diameter 2 1/2"
Bahan
- Pipa PVC M1 1.200 32,000.00 38,400.00 -
- Perlengkapan harga pipa 0.350 32,000.00 11,200.00 -
Tenaga
- Pekerja Oh 0.036 45,000.00 - 1,620.00
- Tukang batu Oh 0.060 60,000.00 - 3,600.00
- Kepala tukang Oh 0.006 70,000.00 - 420.00
- Mandor Oh 0.002 80,000.00 - 144.00
Jumlah 49,600.00 5,784.00 55,384.00
Keuntungan maksimal 10% 5,538.40
Jumlah 60,922.40
Dibulatkan 60,900.00
137 Memasang 1 M1 pipa PVC tipe AW diameter 3"
Bahan
- Pipa PVC M1 1.200 24,375.00 29,250.00 -
- Perlengkapan harga pipa 0.350 24,375.00 8,531.25 -
Tenaga
- Pekerja Oh 0.081 45,000.00 - 3,645.00
- Tukang batu Oh 0.135 60,000.00 - 8,100.00
- Kepala tukang Oh 0.014 70,000.00 - 945.00
- Mandor Oh 0.004 80,000.00 - 328.00
Jumlah 37,781.25 13,018.00 50,799.25
Keuntungan maksimal 10% 5,079.93
Jumlah 55,879.18
Dibulatkan 55,800.00
138 Memasang 1 M1 pipa PVC tipe AW diameter 4"
Bahan
- Pipa PVC M1 1.200 40,750.00 48,900.00 -
- Perlengkapan harga pipa 0.350 40,750.00 14,262.50 -
Tenaga
- Pekerja Oh 0.081 45,000.00 - 3,645.00
- Tukang batu Oh 0.135 60,000.00 - 8,100.00
- Kepala tukang Oh 0.014 70,000.00 - 945.00
- Mandor Oh 0.004 80,000.00 - 328.00
Jumlah 63,162.50 13,018.00 76,180.50
Keuntungan maksimal 10% 7,618.05
Jumlah 83,798.55
Dibulatkan 83,700.00
139 Memasang 1 M1 pipa PVC tipe AW diameter 6"
Bahan
- Pipa PVC M1 1.200 120,000.00 144,000.00 -
- Perlengkapan harga pipa 0.350 120,000.00 42,000.00 -
Tenaga
- Pekerja Oh 0.081 45,000.00 - 3,645.00
- Tukang batu Oh 0.135 60,000.00 - 8,100.00
- Kepala tukang Oh 0.014 70,000.00 - 945.00
- Mandor Oh 0.004 80,000.00 - 328.00
Jumlah 186,000.00 13,018.00 199,018.00
Keuntungan maksimal 10% 19,901.80
Jumlah 218,919.80
Dibulatkan 218,900.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
140 Memasang I buah bak mandl Fibreglass volume 0,30 M 3
Bahan
Bak fibreglass 60 x 60 cm 1 Bh 1.000 350,000.00 350,000.00 -
Perlengkapan Harga Bak 0.180 350,000.00 63,000.00 -
Tenaga
- Pembantu tukang Oh 0.750 45,000.00 - 33,750.00
- Tukang batu Oh 0.500 60,000.00 - 30,000.00
- Kepala tukang Oh 0.100 70,000.00 - 7,000.00
- Mandor Oh 0.100 80,000.00 - 8,000.00
Jumlah 413,000.00 78,750.00 491,750.00
Keuntungan maksimal 10% 49,175.00
Jumlah 540,925.00
Dibulatkan 540,900.00
141 Memasang 1 Buah Kloset jongkok "INA"
Bahan
- kloset jongkok Bh 1.000 335,400.00 335,400.00
- Bata merah 5 x 11 x 22 cm Bh 7.000 600.00 4,200.00
- Semen portland Kg 6.000 1,250.00 7,500.00
- pasir pasang M³ 0.010 195,000.00 1,950.00
Tenaga
- pekerja Oh 1.000 45,000.00 45,000.00
- tukang batu Oh 1.500 60,000.00 90,000.00
- kepala tkg. Batu Oh 0.300 70,000.00 21,000.00
- mandor Oh 0.110 80,000.00 8,800.00
Jumlah 349,050.00 164,800.00 513,850.00
Keuntungan maksimal 10% 51,385.00
Jumlah 565,235.00
Dibulatkan 565,200.00
142 Memasang 1 Buah Kloset Duduk
Bahan
Kloset Duduk Bh 1.000 850,000.00 850,000.00
Perlengakapn Lot 0.060 850,000.00 51,000.00
Tenaga
- pekerja Oh 3.300 45,000.00 148,500.00
- tukang batu Oh 1.100 60,000.00 66,000.00
- kepala tkg. Batu Oh 0.001 70,000.00 70.00
- mandor Oh 0.160 80,000.00 12,800.00
Jumlah 901,000.00 227,370.00 1,128,370.00
Keuntungan maksimal 10% 112,837.00
Jumlah 1,241,207.00
Dibulatkan 1,241,200.00
143 Memasang I buah wastafel "INA"
Bahan
- Wastafel "INA" bh 1.000 302,200.00 302,200.00
- Perlengkapan lot 0.120 36,264.00 4,351.68
- Semen Abu Kg 6.000 1,250.00 7,500.00
- Pasir pasang M³ 0.010 195,000.00 1,950.00
Tenaga
- Pekerja Oh 1.200 45,000.00 54,000.00
- Tukang batu Oh 1.450 60,000.00 87,000.00
- Kepala tukang batu Oh 0.150 70,000.00 10,500.00
- Mandor Oh 0.100 80,000.00 8,000.00
Jumlah 316,001.68 159,500.00 475,501.68
Keuntungan maksimal 10% 47,550.17
Jumlah 523,051.85
Dibulatkan 523,000.00
144 Memasang I buah Kitchenzink
Bahan
Bak cuci stainless steel bh 1.000 251,200.00 251,200.00
Water drain lot 1.000 45,000.00 45,000.00
Tenaga
- Pekerja Oh 0.030 45,000.00 1,350.00
- Tukang batu Oh 0.300 60,000.00 18,000.00
- Kepala tukang batu Oh 0.030 70,000.00 2,100.00
- Mandor Oh 0.002 80,000.00 120.00
Jumlah 296,200.00 21,570.00 317,770.00
Keuntungan maksimal 10% 31,777.00
Jumlah 349,547.00
Dibulatkan 349,500.00
146 1 M2 Pas. Stoot werk
Kayu stoot (dihitung 2 x pakai) 50% bt 9.00 38,194.44 171,875.00
Papan (hitung 2 x pakai) m3 0.02 650,000.00 5,200.00
paku kg 0.50 16,800.00 8,400.00
Pekerja Oh 0.15 45,000.00 6,750.00
Tk. kayu terampil Oh 0.20 60,000.00 12,000.00
Kep. Tukang Kayu Oh 0.20 70,000.00 14,000.00
Mandor Oh 0.02 80,000.00 1,360.00
Jumlah 15,360.00 185,475.00 200,835.00
Dibulatkan 200,800.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
145 1 M' Pasangan Kusen Alumunium
Bahan:
Profil U Alumunium 15 mm btg 0.300 38,833.33 11,650.00
Sekrup kg 0.200 35,000.00 7,000.00
Sealant Kaca btl 0.150 10,000.00 1,500.00
Tenaga:
Pekerja Oh 3.000 45,000.00 135,000.00
Tukang Kayu Oh 1.500 60,000.00 90,000.00
Kepala Tukang Kayu Oh 0.150 70,000.00 10,500.00
Mandor Lot 0.225 80,000.00 18,000.00
Jumlah 20,150.00 253,500.00 273,650.00
Keuntungan maksimal 10% 27,365.00
Jumlah 301,015.00
Dibulatkan 301,000.00
147 1 Kg Pekerjaan Baja IWF EX. DN
Bahan
Besi IWF ex. DN SII kg 1.0500 19,100.00 20,055.00
Meni Besi/Zincromate kg 0.0800 8,800.00 704.00
Tenaga
Pekerja Oh 0.0600 45,000 2,700.00
Tukang Besi Oh 0.0040 60,000 240.00
Kep. Tukang Besi Oh 0.0010 70,000 70.00
Mandor Oh 0.0002 80,000 16.00
Peralatan (oksigen, solar, elpiji, dll) lot 0.1250 23,081 2,885.13
Jumlah 5,911.13 20,759.00 26,670.13
Keuntungan Maksimal 591.11 2,075.90 2,667.01
Jumlah Harga 6,502.24 22,834.90 29,337.14
Dibulatkan 29,300.00
Pejerjaan Konstruksi Baja IWF. DN. + ERECTION 30,700.00
148 1 Kg. Pekerjaan Baja C Lip. ChanelKG PEKERJAAN BAJA C Lip Chanel
Bahan
Besi C Lip Chanel kg 1.1000 14,000.00 15,400.00
Meni Besi/Zincromate kg 0.0800 8,800.00 704.00
Tenaga
Pekerja Oh 0.0600 45,000 2,700.00
Tukang Besi Oh 0.0040 60,000 240.00
Kep. Tukang Besi Oh 0.0010 70,000 70.00
Mandor Oh 0.0002 80,000 16.00
Peralatan (oksigen, solar, elpiji, dll) lot 0.1250 16,104 2,013.00
Jumlah 16,104.00 5,039.00 21,143.00
Keuntungan Maksimal 2,114.30
Jumlah Harga 23,257.30
Dibulatkan 23,200.00
Pekerjaan Konstruksi Baja C. JAPAN + ERECTION 24,600.00
149 1 Kg Pekerjaan Baja Profil
Bahan
Besi Profil DN SII kg 1.1000 17,500.00 19,250.00
Meni Besi/Zincromate kg 0.0800 8,800.00 704.00
Tenaga
Pekerja Trampil Oh 0.0600 45,000 2,700.00
Tukang Besi Profil Terampil Oh 0.0040 60,000 240.00
Kep. Tukang Besi Profil Oh 0.0010 70,000 70.00
Mandor Oh 0.0002 80,000 16.00
Peralatan (oksigen, solar, elpiji, dll) lot 0.1250 19,954 2,494.25
Jumlah 19,954.00 5,520.25 25,474.25
Keuntungan Maksimal 2,547.43
Jumlah Harga 28,021.68
Dibulatkan 28,000.00
Pekerajaan Konstruksi Baja IWF EX JAPAN + ERECTION 29,400.00
150 1 Kg Pek. Konstruksi Baja Siku / Profil Ex. DnPEK. KONSTRUKSI BAJA SIKU / PROFIL EX. DN
Besi profil / besi siku ex. DN kg 1.0500 10,000.00 10,500.00
Pekerja Trampil Oh 0.0600 45,000 2,700.00
Tukang Besi Profil Terampil Oh 0.0040 60,000 240.00
Kep. Tukang Besi Profil Oh 0.0010 70,000 70.00
Mandor Oh 0.0002 80,000 16.00
Peralatan (oksigen, solar, elpiji, dll) lot 0.1250 10,500 1,312.50
Jumlah 10,500.00 4,338.50 14,838.50
Keuntungan Maksimal 1,050.00 433.85 1,483.85
Jumlah Harga 11,550.00 4,772.35 16,322.35
Dibulatkan 16,300.00
1 Kg Pek. Konstruksi Baja Siku / Profil Ex. Dn 17,700.00

Harga Jumlah Harga Jumlah Harga


No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
151 1 Kg Pek. Erection Konstruksi Kuda-Kuda Baja
Pekerja Trampil Oh 0.0010 45,000 45.00
Tukang Besi Profil Terampil Oh 0.0010 60,000 60.00
Kep. Tukang Besi Profil Oh 0.0002 70,000 14.00
Mandor Oh 0.0001 80,000 8.00
Operator alat besar Oh 0.0002 40,000 8.00
Pembantu operator Oh 0.0200 38,000 760.00
Sewa alat ls 0.0002 1,800,000 360.00
Bahan bakar solar lt 0.0100 4,300 43.00
Pelumas lt 0.0010 20,000 20.00
Alat bantu lot 0.0002 1,318 0.26
Jumlah 1,318.26 - 1,318.26
Keuntungan Maksimal - 131.83
Jumlah Harga - 1,450.09
Dibulatkan 1,400.00
152 1 CM Pengelasan dengan Las Listrik Tebal = 4 mm
Kawat las listrik kg 0.0400 17,800 712.00
Bahan bakar solar lt 0.0300 4,300 129.00
Pelumas lt 0.0040 20,000 80.00
Pekerja Trampil Oh 0.0600 45,000 2,700.00
Tukang Besi Profil Terampil Oh 0.0040 60,000 240.00
Kep. Tukang Besi Profil Oh 0.0010 70,000 70.00
Mandor Oh 0.0002 80,000 16.00
Alat bantu ( mesin las listrik) lot 0.1250 3,026 378.25
Jumlah 921.00 3,404.25 4,325.25
Keuntungan Maksimal 432.53
Jumlah Harga 4,757.78
Dibulatkan 4,700.00
153 1 Titik melubang konstruksi baja dengan listrik
Pekerja Trampil Oh 0.0500 45,000 2,250.00
Tukang Besi Profil Terampil Oh 0.0200 60,000 1,200.00
Kep. Tukang Besi Profil Oh 0.0030 70,000 210.00
Mandor Oh 0.0010 80,000 80.00
Alat bantu ( mesin bor listrik) lot 0.2500 3,740 935.00
Jumlah 4,675.00 - 4,675.00
Keuntungan Maksimal 467.50
Jumlah Harga 5,142.50
Dibulatkan 5,100.00
154 1 UNIT PASANG SAKLAR SINGLE, EX. PANASONIC
Saklar single Brocco bh 1.000 -
Mangkok Pengaman bh 1.000
isolasi bh 0.250
pekerja Oh 0.100
Tukang listrik Oh 0.100
Kepala Tukang Oh 0.050
Mandor Oh 0.025
Jumlah -
Keuntungan Maksimal -
Jumlah Harga -
Dibulatkan
155 1 UNIT PASANG SAKLAR DOUBLE, EX. PANASONIC
Saklar DOUBLE PANASONIC bh 1.000
Mangkok Pengaman bh 1.000
isolasi bh 0.250
pekerja Oh 0.100
Tukang listrik Oh 0.100
Kepala Tukang Oh 0.050
Mandor Oh 0.025
Jumlah -
Keuntungan Maksimal -
Jumlah Harga -
Dibulatkan
156 1 TTK SPARING TITIK CAHAYA/LAMPU LISTRIK

Sparing kabel,PVC 1/2" m1 0.600


Mangkok Listrik bh 1.000
isolasi bh 0.500
Klem Sparing bh 3.000
Alat Bantu ls 1.000
pekerja Oh 0.050
Tukang listrik Oh 0.020
Kepala Tukang Oh 0.100
Mandor Oh 0.100
Jumlah
Dibulatkan
157 1 UNIT PASANG SAKLAR DOUBLE, EX. PANASONIC
Saklar DOUBLE PANASONIC bh 1.000
Mangkok Pengaman bh 1.000
isolasi bh 0.250
pekerja Oh 0.100
Tukang listrik Oh 0.100
Kepala Tukang Oh 0.050
Mandor Oh 0.025
Jumlah -
Keuntungan Maksimal -
Jumlah Harga -
Dibulatkan
154 1 Unit Septicktank 5 X 1.5 X 2 m + Rembesan
Galian tanah m3 6.0000 33,200 199,200.00
Pasir urug m3 0.2420 286,000 69,212.00
Lantai kerja m2 0.4800 87,400 41,952.00
Pas bata 1 PC : 3 PS + Plesteran m2 12.9000 62,800 810,120.00
Plat beton penutup & balok m3 0.4840 4,386,300 2,122,969.20
Pipa PVC 4 " jenis AW + sambungan m1 9.0000 65,000 585,000.00
Pipa GIP 1 1/2" m1 2.0000 55,000 110,000.00
Galian tanah untuk rembesan m3 5.6250 33,200 186,750.00
Pas. injuk m2 9.0000 20,000 180,000.00
Urugan kerikil 3/5 cm m3 1.7500 90,000 157,500.00
Pipa PVC 4 " berlobang jenis AW m1 6.0000 65,000 390,000.00
Urugan kembali perataan tanah m3 1.8750 10,000 18,750.00
tambahan upah lot 0.0850 4,871,453 414,073.52
Jumlah 414,073.52 4,871,453.20 5,285,526.72
Keuntungan Maksimal 528,552.67
Jumlah Harga 5,814,079.39
155 1 M3 Pondasi Telapak Setempat 1.00 x 1.00 m Tul. O 16 - 15cm,
Beton Site Mix K- 225 m3 1.0000 1,145,800 1,145,800 1,145,800
Besi Beton U. 24 kg 55.1800 9,000 496,620 14,700 511,320
Bekisting Papan m2 2.0000 71,400 142,800 142,800
Jumlah 1,799,920
Biaya umum 10% 179,992
Jumlah Harga 1,979,912
Dibulatkan 1,979,900.00
Harga Jumlah Harga Jumlah Harga
No. Uraian Sat. Koeff. Satuan Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
156 1 M3 Pondasi telapak setempat 0.9 x 0.9 m.
Beton Site Mix K- 225 m3 1.0000 1,145,800 1,145,800 1,145,800
Besi Beton U.24 kg 76.4741 9,000 688,267 14,700 702,967
Bekisting Papan m2 2.0000 71,400 142,800 142,800
Jumlah 1,976,867 1,991,567
Biaya umum 10% 197,687 199,157
Jumlah Harga 2,174,553 2,190,723
Dibulatkan 2,190,700.00
157 1 M3 Pek. Beton Cantilever T. 10 CM
Beton Site Mix Mix K- 225 m3 1.0000 1,145,800 1,145,800 1,145,800
Besi Beton U. 24 kg 193.3333 9,000 1,740,000 14,700.00 1,754,700
Bekisting Multipleks 9 mm m2 13.3333 71,400 0.50 476,000.00 476,000
Stoot werk m2 3.3333 200,800 0.50 334,666.67 334,666.67
Jumlah 3,711,167
Keuntungan Maksimal 371,117
Jumlah Harga 4,082,283
Dibulatkan 4,082,200.00
158 1 Bh Daun Pintu Double Teakwood
Bahan
Rangka Kayu kamper banjar m3 0.0150 5,950,000 89,250
Teakwood 4 mm (ukuran pintu) lbr 2.0000 107,000 214,000
Lem Kayu kg 0.0500 85,000 4,250
Paku Tripleks kg 0.2000 20,000 4,000
Tenaga
Pekerja Trampil Oh 0.3000 45,000 13,500.00
Tukang Kayu Trampil Oh 1.5000 70,000 105,000.00
Kep. Tukang Kayu Oh 0.2000 70,000 14,000.00
Mandor Oh 0.0200 80,000 1,600.00
Jumlah 311,500.00 134,100.00 445,600.00
Keuntungan Maksimal 44,560.00
Jumlah Harga 490,160.00
Dibulatkan 490,100.00
159 1 Bh Daun Pintu Teakwood Lapis Formika
Bahan
Rangka Kayu kamper banjar m3 0.0150 5,950,000 89,250
Tripleks 4 mm (ukuran pintu) lbr 2.0000 107,000 214,000
Formika Ukuran Pintu lbr 1.0000 143,000 143,000
Paku Tripleks kg 0.2000 20,000 4,000
Lem putih (FOX) kg 0.5000 85,000 42,500
Lem kuning (ICA AIBON) kg 1.0000 75,000 75,000
Tenaga
Pekerja Trampil Oh 0.3000 45,000 13,500.00
Tukang Kayu Trampil Oh 1.3000 70,000 91,000.00
Kep. Tukang Kayu Oh 0.1300 70,000 9,100.00
Mandor Oh 0.0130 80,000 1,040.00
Jumlah 567,750.00 114,640.00 682,390.00
Keuntungan Maksimal 68,239.00
Jumlah Harga 750,629.00
Dibulatkan 750,600.00
160 1 Bh Daun Pintu Teakwood Seng
Bahan
Seng Plat 3' x 6' Bjls 28 m3 0.5000 35,000 17,500
Paku Biasa 1/2 - 1 ' lbr 0.0150 16,800 252
Kayu Borneo, Papan lbr 0.0190 2,750,000 52,250
Flincote/Meni Besi kg 0.3000 22,000 6,600
Tenaga
Pekerja Oh 0.0400 45,000 1,800.00
Tukang Kayu Oh 0.4000 70,000 28,000.00
Kep. Tukang Kayu Oh 0.0250 70,000 1,750.00
Mandor Oh 0.0013 80,000 100.00
Jumlah 76,602.00 31,650.00 108,252.00
Keuntungan Maksimal 10,825.20
Jumlah Harga 119,077.20
Dibulatkan 119,000.00
161 1 UNIT PASANG EXHOUSE FAN, NASIONAL/PANASONIC
Exhouse Fan 40 X 40 National bh 1.000 335,325.00 335325.000
pekerja Oh 0.100 45,000 4,500.00
Tukang listrik Oh 0.100 70,000 7,000.00
Kepala Tukang Oh 0.050 70,000 3,500.00
Mandor Oh 0.025 80,000 2,000.00
Jumlah 335,325.00 17,000.00 352,325.00
Keuntungan Maksimal 35,232.50
Jumlah Harga 387,557.50
Dibulatkan 387,500.00
1.00

2.00
12.00 3.75

3.00 399,480.00

4.00

5.00
6.00

7.00

8.00

9.00

10.00

11.00
12.00 1,050.00

13.00

14.00

15.00
16.00

17.00

18.00

20.00
21.00

0.03
33.33

22.00

24.00

25.00
26.00

27.00

28.00

27.00
30.00

31.00

31.00

33.00
34.00

35.00

36.00

37.00

38.00
39.00 7,636,140.00

40.00
43.00

44.00

45.00

46.00
48.00

49.00

50.00
51.00

52.00

53.00

54.00
55.00

56.00

56.00

57.00
58.00

59.00

60.00

61.00
62.00

63.00

64.00

65.00
66.00

0.40
67.00

68.00

6.25
1.58 6.33
2.10 8.40
14.73
0.36
2.88

70.00

72.00

73.00
74.00

75.00

76.00
77.00

78.00

79.00

80.00

81.00

17,900.00
82.00

83.00

84.00

85.00

86.00

87.00
90.00

91.00

92.00
124.00

125.00

126.00

127.00

128.00
129.00

130.00

131.00

132.00

133.00
134.00

135.00

136.00

137.00
138.00

139.00

140.00
141.00

143.00

39,583.33

146.00
145.00

147.00

148.00

149.00
150.00

151.00

152.00

153.00

154.00
155.00

-
-
-
-
-
-
-
-
-
-
-

154.00

155
156

157.00

158.00

159.00

160.00

335,325.00
HARGA SATUAN PEKERJAAN
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2012

Harga
No. Uraian
Rp.

1 2 2

1 1 M2 Pek. Kantor Direksi 633,200.00


3 1 m3 Pekerjaan Bongkaran 332,900.00
4 1 m² Membersihkan lapangan dan perataan 19,200.00
5 1 m¹ Pengukuran dan pemasangan bouwplank 25,200.00
6 1 m³ Galian tanah biasa sedalam 1 meter 33,200.00
7 1 m³ Galian tanah biasa sedalam 2 meter 91,200.00
8 1 M3. Galian Tanah Pondasi Straus 147,800.00
9 1 m³ Urugan tanah kembali 16,100.00
10 1 m³ Pemadatan tanah setiap 20 cm, tanah dari luar lokasi. 72,800.00
11 1 m³ Pemadatan tanah setiap 20 cm, tanah di lokasi. 29,100.00
12 1 m³ Urugan pasir 286,000.00
13 1 m³ Urugan Sirtu 139,600.00
14 1 m³ Pasang pondasi batu kosong ( aanstamping ). 269,800.00
15 1 m³ Pasang pondasi batu kali, 1 Pc. : 3 Ps. 676,200.00
16 1 m³ Pasang pondasi batu kali, 1 Pc. : 5 Ps. 580,800.00
17 1 m3 Pondasi Strausz 1,990,580.00
18 1 m3 Pondasi Poer 1,510,750.00
19 1 m2 Pasangan Batu Andersit 294,800.00
20 1 m² Pasangan bata merah tebal ½ bata, 1 Pc. : 3 Ps. 102,700.00
21 1 m² Pasangan bata merah tebal ½ bata, 1 Pc. : 5 Ps. 97,100.00
22 1 m² Pasangan dinding rooster / terawang. ( 12 x 11 x 24 cm ) 609,600.00
23 1 m² Pasangan Glass Blok 2,455,000.00
24 1 m² Plesteran 1 Pc. : 3 Ps; tebal 15 mm. 62,800.00
25 1 m² Plesteran + Acian 1 Pc. : 5 Ps; tebal 15 mm. 62,600.00
26 1 m² Penebalan Plesteran + Acian 1 Pc. : 5 Ps; tebal 15 mm. 178,800.00
27 1 m² Plesteran beton 1 Pc. : 3 Ps; tebal 15 mm. 42,900.00
28 1 m² Lapisan Waterprofing 110,400.00
29 1 m² Lapisan Waterprofing Coating 214,800.00
30 1 m² Pasang kaca, tebal 3 mm 99,500.00
31 1 m² Pasang kaca, tebal 5 mm 126,800.00
32 1 m² Pasang kaca, tebal 8 mm 117,700.00
33 1 Buah pasang engsel pintu. 64,100.00
34 1 Buah pasang engsel jendela kupu - kupu. 57,900.00
35 1 Buah Kunci 2 Slaag Silinder utama Standard 209,600.00
36 1 Buah pasang kunci tanam kamar mandi. 55,800.00
37 1 Buah pasang kait angin. 50,900.00
38 1 buah pasang kunci selot 39,400.00
39 1 m² Pasang rangka atap genteng / kodok, kayu borneo. 53,700.00
40 1 m² Pasang atap genteng 121,800.00
41 1 m² Pasang atap genteng Metal 101,000.00
42 1 m¹ Pasang bubung metal 75,000.00
43 1 m¹ Pasang bubung 110,300.00
44 1 m² Pasang rangka langit -langit ( 0.60 x 0.60 ) m, kayu borneo Super 55,900.00
45 1 m² Pasang Penutup langit-langit Gypsum Board 51,100.00
46 1 m¹ Pasang list Plafond 28,800.00
47 1 m³ Pasang konstruksi kuda - kuda, kayu Kamper Medan 7,556,600.00
48 1 m' Pasang listplank ( 3 x 30 ) cm, kayu borneo. 56,200.00
49 1 m¹ Pasang talang datar, seng BJLS 28. 90,500.00
50 1 m' Pasangan Fllasing Seng 36,300.00
51 1 m³ Membuat Lantai Kerja Beton Tumbuk 1 : 3 : 5 87,400.00
52 1 m³ Membuat Rabat Beton Tumbuk 1 : 3 : 5 652,900.00
Harga
No. Uraian
Rp.

1 2 2
53 1 m³ Membuat Beton Mutu K 175 809,800.00
54 1 m³ Membuat Beton Mutu Site Mix K 225 1,145,800.00
55 1 m³ Membuat beton tumbuk, 1 Pc. : 3 Ps. : 5 Kr. 730,800.00
56 1 Kg Pembesian dengan besi polos . 14,700.00
57 1 Kg Besi Beton Terpasang U. 39 15,000.00
58 1 m² Pasang bekisting untuk sloof. 78,000.00
59 1 m² Pasang bekisting untuk kolom struktur 336,100.00
60 1 m² Pasang bekisting untuk kolom struktur biasa 130,200.00
61 1 m2 Bekisting Multiplek 9 mm 113,800.00
62 1 m² Pasang bekisting untuk balok biasa 134,000.00
63 1 m² Pasang bekisting untuk pondasi. 71,400.00
64 1 m² Pasang bekisting untuk lantai. 196,900.00
65 1 M² Pasang bekisting untuk tangga. 159,000.00
66 1 M1 pasangan saluran grevel 1/2 Ø 20 cm + pasangan 158,200.00
67 1 M² Pasang dinding keramik warna, uk. 20 x 20 cm. 190,900.00
68 1 M² Pasang lantai keramik non slip, uk. 20 x 20 cm. 192,600.00
69 1 M² Pasang lantai keramik, uk. 40 x 40 cm. 309,200.00
70 1 M² Pasang lantai keramik, uk. 30 x 30 cm. 149,700.00
71 1 M² Pasang Plint keramik, uk. 10 x 40 cm. 86,900.00
72 Memasang 1 buah floor drain. 22,000.00
73 Memasang 1 buah kran air, Ø ½" atau Ø ¾" 52,100.00
74 1 m² Mendempul dan menggosok bidang kayu. 6,900.00
75 1 m² Mendempul dan menggosok bidang tembok. 6,900.00
76 1 m² Pengecatan bidang kayu lama. 20,700.00
77 1 m² Pengecatan bidang kayu baru. 25,000.00
78 1 m² Pelaburan bidang kayu dengan politur. 9,500.00
79 1 m² Pelaburan bidang kayu dengan cat residu. 5,400.00
80 1 M2 Pengecatan Plafond dengan Sanlek ( 3 X ) 33,500.00
81 1 m² Zincromate Baja 8,800.00
82 1 m² Pengecatan bidang tembok baru. 15,600.00
83 1 m² Pengecatan bidang tembok baru + Pendempulan. 22,500.00
84 1 m² Pelaburan bidang kayu dengan politur. 16,400.00
85 1 m² Pengecatan bidang kayu baru + Pendempulan 31,900.00
86 1 M3 Pek. Beton Sloof 15/25 3,960,000.00
87 1 M3 Pek. Beton Kolom 15/15 3,612,000.00
88 1 M3 Pek. Beton Kolom 15/25 3,682,000.00

Harga
No. Uraian
Rp.

1 2 2
117 1 M3 Pek. Beton Kolom 25/25 3,671,000.00
118 1 M3 Pek. Beton Ringbalk 15/15 3,640,000.00
119 1 M3 Pek. Beton Balok 15/25 3,704,000.00
125 1 M3 Pek.Beton Plat lantai ,T.12cm 4,386,300.00
127 1 M3 Pek. Beton Cantilever T. 10 CM 4,081,600.00
128 Memasang 1 M1 pipa Stainless Dia 3' 25,000.00
129 Memasang 1 M1 pipa Stainless Dia 2' 98,600.00
130 Memasang 1 M1 pipa Stainless Dia 1' 8,300.00
131 Memasang 1 M1 pipa PVC tipe AW diameter 1/2" 13,800.00
132 Memasang 1 M1 pipa PVC tipe AW diameter 3/4" 18,800.00
133 Memasang 1 M1 pipa PVC tipe AW diameter 1" 23,400.00
134 Memasang 1 M1 pipa PVC tipe AW diameter 1 1/2 " 37,600.00
135 Memasang 1 M1 pipa PVC tipe AW diameter 2 " 46,400.00
136 Memasang 1 M1 pipa PVC tipe AW diameter 2 1/2" 60,900.00
137 Memasang 1 M1 pipa PVC tipe AW diameter 3" 55,800.00
138 Memasang 1 M1 pipa PVC tipe AW diameter 4" 83,700.00
139 Memasang 1 M1 pipa PVC tipe AW diameter 6" 218,900.00
140 Memasang I buah bak mandl Fibreglass volume 0,30 M3 540,900.00
141 Memasang 1 Buah Kloset jongkok "INA" 565,200.00
142 Memasang 1 Buah Kloset Duduk 1,241,200.00
143 Memasang I buah wastafel "INA" 523,000.00
144 Memasang I buah Kitchenzink 349,500.00
145 1 M' Pasangan Kusen Alumunium 301,000.00
146 1 M2 Pas. Stoot werk 200,800.00
147 1 Kg Pekerjaan Baja IWF EX. DN 29,300.00
148 1 Kg. Pekerjaan Baja C Lip. ChanelKG PEKERJAAN BAJA C Lip Chanel 23,200.00
149 1 Kg Pekerjaan Baja Profil 28,000.00
150 1 Kg Pek. Konstruksi Baja Siku / Profil Ex. DnPEK. KONSTRUKSI BAJA SIKU / PROFIL EX. DN 16,300.00
151 1 Kg Pek. Erection Konstruksi Kuda-Kuda Baja 1,400.00
152 1 CM Pengelasan dengan Las Listrik Tebal = 4 mm 4,700.00
153 1 Titik melubang konstruksi baja dengan listrik 5,100.00
154 1 Unit Septicktank 5 X 1.5 X 2 m + Rembesan 5,814,079.39
155 1 M3 Pondasi Telapak Setempat 1.00 x 1.00 m Tul. O 16 - 15cm, 1,979,900.00
156 1 M3 Pondasi telapak setempat 0.9 x 0.9 m. 2,190,700.00
157 1 M3 Pek. Beton Cantilever T. 10 CM 4,082,200.00
158 1 Bh Daun Pintu Double Teakwood 490,100.00
159 1 Bh Daun Pintu Teakwood Lapis Formika 750,600.00
160 1 Bh Daun Pintu Teakwood Seng 119,000.00
HITUNGAN UKURAN LANTAI 1 BANGUNAN BARU

p l
Pemasangan Bowplank 46.00 1.2
bongkaran pas dinding

galian pondasi telapak 8.06 3.528


galian pondasi batu kali 101.21 0.54
Urugan pasir bawah pondasi telapak 0.29 0.126
Urugan pasir bawah pondasi batu kali 101.21 0.045
Urugan kembali
galian septic tnk 6.00 1.2
galian reservoar

pondasi telapak 70x70 0.16 9


pondasi telapak 50x50 0.09 7

Pondasi batu kali 101.21 0.37125


Lantai kerja bawah pondasi telapak 0.29 0.126

sloof 101.21 0.0375


Kolom25/25 0.94 0.65
Kolom 15/30 K1 0.16 19
Kolom 15/15 K2 0.08 9
Pedestal 25/25 0.10 15
Balok 15/25 116.21 0.0375
Ring Balk 15/20 2.22 1.1
List Plank Beton
Plat beton T = 10 0.12 1.05
Lantai beton T=12cm
beton Variasi jendela T = 8 0.17 1.05
Balok 15/25 Tangga 0.04 6.888
Beton Anak Tangga & bordes 4.05 0.1 1.05
Dak Toren

Reservoar
Penutup Reservoar

Pasa Bata Septictank 7.70 2


kolom 15/15 0.05 4
balok 15/20 8.47 0.03
Rabat Beton Septic Tank 1.65 2
Penutup Septictank t = 12 3.30 0.12

Meja dapur 1.76 0.1

Saluran 3' 16.20 15.9 20.9


Saluran 4' 17.10 20.9
Saluran 3/4
Saluran 1/2 43.50 14.5 26.5
Pas. Kran Angsa Dapur 1/2" Sek. Onda 1.00
Pas. Kloset Duduk sek. America standart/Toto 1.00
Pas. Saringan air (floor drain) 2.00
Pas. Bak Shower Sekelas Alco Fiber Florensia 1.00
Pas. Bak cuci dapur/kitchensink Eks. Lokal 1.00

Pas dinding Bata 101.21 3.3


Plester &acian 334.01 2
Pas Batu alam Andersit Rata Bakar 5.34 1.2
Pas Batu alam Andersit Tatah 5.52 7.776
Lst Plesteran 7.20 3
Penebalan Plesteran 3.45 1.2

Pintu
Pintu Geser
Kusen Pintu + Jendela Depan 13.75 1.1
Kusen Pintu 5.13 1.1 4
Kusen Pintu Geser 7.00 1.1
Kusen Jendela Depan 7.75 1.1
Kusen Jendela belakang 1 9.75 1.1
Kusen Jendela belakang 2 9.00 1.1
Kusen Jendela Teras 2.50 1.1 3
Daun Jendela 6.50 1.1 8
Kaca Jendela t = 5mm 5.56 1.1
Kaca Pintu Geser t = 8mm 1.07 1.1

Gypsum 51.00 1.1


List gypsum 82.55 1.1

Keramik Meja dapur 4.91


Dinding Keramik meja Dapur 2.52 1.1
Lantai KM Mandi 1.65 2
Dinding Km Mandi 14.00

Lantai Keramik 40 x 40 55.82 1.1


Lantai Keramik 40 x 40 teras depan 2.75 1.1
Lantai Keramik 30 x 30 anak tangga & bordes 6.08
Lantai Keramik Car Port 9.29 1.1

Melamik Pintu
Melamik Pintu Geser
Melamik Kusen Pintu + Jendela Depan 13.75 1.1
Melamik Kusen Pintu 5.13 1.1 4
MelamikKusen Pintu Geser 7.00 1.1
Melamik Kusen Jendela Depan 7.75 1.1
Melamik Kusen Jendela belakang 1 9.75 1.1
Melamik Kusen Jendela belakang 2 9.00 1.3
Melamik Kusen Jendela Teras 2.50 1.1 3

Rangka Atap Baja Ringan


List Plank

Nok
Genteng

Pek Pagar
Railling Tangga
Railling Teras Lt2

Pek. Canopi Carport 11.34 1.1


Pas. Kunci Pintu Panel 5
Pas. Kunci Pintu Geser 1
Pas. Engsel Pintu Panel 8
Pas. Engsel Daun Jendela 5
Pas. Kunci Slot Daun Jendela 5
Pas. Ramskar/Kait Angin 5
Rel pintu Geser 1

Instalasi titik lampu 18


Saklar Tunggal sek. Broco 9
Saklar Double sek. Broco 2
Stop kontak sek. Broco 6
Outlet TV 2
Downlight + sl 18 watt 8
Instalsi titik MCB 3
Box MCB (Presto) 1
HITUNGAN UKURAN LANTAI 2 BANGUNAN BARU

55.2

11.59
54.66
0.41
4.55
33.12
7.2

1.44
0.63

37.58
0.41

3.80
1.59
2.96 Kolom 15/30 K1 0.16
0.70 Kolom 15/15 K2 0.08
1.48 Pedestal 25/25
4.36 Balok 15/25 69.73
2.22 Ring Balk 15/20 2.53
List Plank Beton
1.17 Plat beton T = 10 0.12
Lantai beton T=12cm 67.65
0.17 Plat beton Variasi jendela T = 8 0.17
0.26 Balok 15/25 Tangga
0.43 Plat Beton Anak Tangga & bordes
Dak Toren 0.408

Reservoar
Penutup Reservoar

15.40
0.20
0.25
3.30
0.40

0.18 Meja dapur

53.00 Saluran 3'


38.00 Saluran 4'
0.00 Saluran 3/4
84.50 Saluran 1/2
1.00 Pas. Kran Angsa Dapur 1/2" Sek. Onda 1
1.00 Pas. Kloset Duduk sek. America standart/Toto 1
2.00 Pas. Saringan air (floor drain) 3
1.00 Pas. Bak Shower Sekelas Alco Fiber Florensia 1
1.00 Pas. Bak cuci dapur/kitchensink Eks. Lokal

334.01 Pas dinding Bata 62.73


668.01 Plester &acian 230.75
6.41 Pas Batu alam Andersit Rata Bakar
13.30 Pas Batu alam Andersit Tatah
10.20 Lst Plesteran 7.20
4.14 Penebalan Plesteran 3.45

5.00 Pek. Pintu Panel


1.00 Pek. Pintu Geser
15.13 Pek. Kusen Pintu + Jendela Depan 21.25
22.55 Pek. Kusen Pintu 5.13
7.70 Pek. Kusen Pintu Geser 7.00
8.53 Pek. Kusen Jendela Depan 7.75
10.73 Pek. Kusen Jendela belakang 1 9.75
9.90 Pek. Kusen Jendela belakang 2 9.00
8.25 Pek. Kusen Jendela Teras
57.20 Pek. Daun Jendela 6.50
6.12 Pek. Kaca Jendela t = 5mm 7.60
1.18 Pek. Kaca Pintu Geser t = 8mm 1.07
Pek. Kusen Meja Dapur
Pek. Pintu Meja Dapur

56.10 Gypsum 63.47


90.81 List gypsum 97.05

4.91 Keramik Meja dapur 4.91


2.77 Dinding Keramik meja Dapur 2.52
3.30 Lantai KM Mandi 1.65
14.00 Dinding Km Mandi 14.00

61.40 Lantai Keramik 40 x 40 55.82


3.03 Lantai Keramik 40 x 40 teras depan 3.42
6.08 Lantai Keramik 30 x 30 anak tangga & bordes
10.22

5.00 Melamik Pintu


1.00 Melamik Pintu Geser
15.13 Melamik Kusen Pintu + Jendela Depan 21.25
22.55 Melamik Kusen Pintu 5.13
7.70 MelamikKusen Pintu Geser 7.00
8.53 Melamik Kusen Jendela Depan 7.75
10.73 Melamik Kusen Jendela belakang 1 9.75
11.70 Melamik Kusen Jendela belakang 2 9.00
8.25 Melamik Kusen Jendela Teras 2.50

0.00 Rangka Atap Baja Ringan 78.738


0.00 List Plank 5.3

0.00 Nok 5.3


0.00 Genteng 78.738

2.30
Railling Tangga 11.15
Railling Teras Lt2 5.13

12.47
5 Pas. Kunci Pintu Panel 5
1 Pas. Kunci Pintu Geser 1
8 Pas. Engsel Pintu Panel 8
5 Pas. Engsel Daun Jendela 5
5 Pas. Kunci Slot Daun Jendela 5
5 Pas. Ramskar/Kait Angin 5
1 Rel pintu Geser 1

18 Instalasi titik lampu 18


9 Saklar Tunggal sek. Broco 8
2 Saklar Double sek. Broco 2
6 Stop kontak sek. Broco 6
2 Outlet TV 3
8 Downlight + sl 18 watt 8
3 Instalsi titik MCB
1 Box MCB (Presto)
TAI 2 BANGUNAN BARU

16 2.53
6 0.08 0.03 24 0.83

0.0375 2.62
1.1 2.78

1.1 1.22
0.12 8.12
1.1 0.18

1.2 0.49

1
1
3
1

3.2 230.75
2 461.49

3 10.20
1.2 4.14

5
1
1.1 23.375
1.1 4 22.55
1.1 7.7
1.1 8.525
1.1 10.725
1.1 9.9
0
1.1 8 57.2
1.1 8.36
1.1 1.18

1.1 69.82
1.1 106.76

4.91
1.1 2.77
2 3.30
14.00

1.2 66.984
1.2 4.104

5.00
1.00
1.1 23.38
1.1 4 22.55
1.1 7.70
1.1 8.53
1.1 10.73
1.3 11.70
1.1 3 8.25

78.738
2 10.6

5.3
78.738

0
1 11.15
1 5.13
5
1
8
5
5
5
1

18
8
2
6
3
8
REKAPITULASI
RENCANA ANGGARAN BIAYA
TAHUN 20112

NO URAIAN PEKERJAAN BIAYA (Rp)

I. PEKERJAAN PERSIAPAN 1,659,200.00


II. PEKERJAAN GALIAN DAN URUGAN 3,790,836.13
III. PEKERJAAN BETON DAN PONDASI 155,826,918.66
IV. PEKERJAAN DINDING + PLESTERAN 113,307,012.26
V. PEKERJAAN KUSEN PINTU DAN JENDELA 23,641,368.00
VI PEKERJAAN LANTAI & DINDING KERAMIK 25,690,678.40
VII. PEKERJAAN PLAFOND 18,518,100.00
VIII. PEK. KONSTRUKSI ATAP & PENUTUP ATAP 24,577,070.00
IX. PEKERJAAN ALAT PENGGANTUNG 7,793,600.00
X. PEKERJAAN INSTALASI LISTRIK 8,139,000.00
XI. PEKERJAAN INSTALASI AIR 12,229,368.00
XII. PEKERJAAN FINISHING & PENGECATAN 38,438,560.14
XIII. PEKERJAAN PAGAR 5,643,750.00
TOTAL 439,255,461.59

TOTAL BIAYA BANGUNAN 439,255,461.59


RENCANA ANGGARAN BIAYA
PEKERJAAN RUMAH TINGGAL CINUNUK
TAHUN ANGGARAN 2012

N0. URAIAN/ITEM PEKERJAAN SAT VOLUME HRG SATUAN JML HRG


1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan bouwplank m' 46.00 25,200.00 1,159,200.00
2 Mobilisasi ls 1.00 500,000.00 500,000.00
3 Direksikeet m2 -
SUB TOTAL 1,659,200.00
II. PEKERJAAN GALIAN DAN URUGAN
1 Galian tanah perataan lantai untuk garasi m3 26.27 33,200.00 872,097.60
2 Galian tanah untuk pondasi telapak m3 11.59 33,200.00 384,854.40
3 Galian tanah untuk pondasi batu kali m3 54.66 26,560.00 1,451,655.77
4 Urugan pasir dibawah Pondasi telapak t=5cm m3 0.41 286,000.00 118,404.00
5 Urugan pasir dibawah pondasi batu kali t=5 cm m3 4.55 286,000.00 1,302,627.86
6 Urugan Tanah Kembali m3 33.12 16,100.00 533,294.10
SUB TOTAL 3,790,836.13
III. PEKERJAAN BETON DAN PONDASI
1 Pondasi Telapak Beton 0,8 x 0,8 m3 1.44 2,190,700.00 3,154,608.00
2 Pondasi Telapak Beton 0,6 x 0,6 m3 0.63 2,190,700.00 1,380,141.00
3 Pasangan pondasi batu kali 1 : 5 m3 37.58 580,800.00 21,824,026.71
4 Pek. Sloof beton 15/25 m3 3.80 3,960,000.00 15,030,321.43
5 Pek. Kolom 25/25 cm m3 1.59 3,671,000.00 5,827,712.50
6 Pek. Kolom 15/30 m3 5.50 3,682,000.00 20,239,861.95
7 Pek. Kolom Praktis 15/15 m3 1.61 3,612,000.00 5,825,189.79
8 Pek. Balok 15/20 m3 0.36 3,704,000.00 1,333,440.00
9 Pek. Balok 15/25 m3 6.97 3,640,000.00 25,381,850.00
10 Pek. Balok 15/35 m3 0.20 3,640,000.00 735,735.00
11 Pek. Ring Balok 15/15 m3 1.44 3,704,000.00 5,344,872.00
12 Plat beton T = 10 m3 0.43 4,081,600.00 1,751,006.40
13 Lantai beton T=12cm m3 10.19 4,386,300.00 44,692,887.96
14 Beton Variasi Jendela T = 8 m3 0.22 4,081,600.00 914,278.40
15 Balok 10/20 Tangga m3 0.17 3,704,000.00 616,716.00
16 Beton Anak Tangga & bordes m3 0.43 4,081,600.00 1,774,271.52
SUB TOTAL 155,826,918.66
IV. PEKERJAAN DINDING + PLESTERAN
1 Pasangan dinding bata ( 1/2 bata ) 1 : 5 Eks. Bata Merah Bakar m2 530.14 97,100.00 51,476,769.70
2 Plesteran + acian dinding bata camp. 1 : 5 m2 850.28 62,600.00 53,227,754.55
3 Pas. Batu Alam Andersit Rata Bakar m2 21.66 294,800.00 6,385,368.00
4 Pas. Batu Alam Andersit Tatah m2 3.84 294,800.00 1,132,032.00
5 List Plester m' 7.56 70,000.00 529,200.00
6 Penebalan Plesteran m2 8.88 62,600.00 555,888.00
SUB TOTAL 113,307,012.26
V. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Pintu Panel bh 12.00 850,000.00 10,200,000.00
2 Pek. Kusen Gendong m' 33.00 75,000.00 2,475,000.00
3 Pek. Kusen Pintu m' 43.46 75,000.00 3,259,500.00
4 Pek. Kusen Jendela m' 55.50 75,000.00 4,162,500.00
5 Pek. Daun Jendela m' 37.39 60,000.00 2,243,400.00
6 Pek. Kaca Jendela t = 5mm m2 10.26 126,800.00 1,300,968.00
SUB TOTAL 23,641,368.00
VI. PEKERJAAN LANTAI & DINDING KERAMIK
1 Pas. Lantai keramik Km/wc 20 x 20 cm Sek. Masterina/Roman m2 6.46 124,500.00 804,270.00
2 Pas. Dinding keramik km/wc 25/33.3 cm Sek. Masterina/Roman m2 23.26 190,900.00 4,439,570.40
N0. URAIAN/ITEM PEKERJAAN SAT VOLUME HRG SATUAN JML HRG
1 2 3 4 5 6

3 Pas. List Dinding Keramik Sek. Masterina/Roman m' 14.40 47,800.00 688,320.00
4 Pas. Lantai Keramik Uk. 40 x 40 m2 106.07 141,400.00 14,998,298.00
5 Pas. Lantai Keramik Anak Tangga & Bordes Uk. 30 x 30 m2 5.84 126,400.00 738,176.00
6 Pas. Lantai Keramik Anak Tangga Teras Depan Uk 30 x 30 m2 4.86 126,400.00 614,304.00
6 Pas. Lantai Keramik garasi Uk. 40 x 40 Dop m2 24.10 141,400.00 3,407,740.00
SUB TOTAL 25,690,678.40
VII. PEKERJAAN PLAFOND
1 Pek. Penutup (Gypsum Board) + Rangka Galvanish m2 126.80 82,500.00 10,461,000.00
2 Pek. Penutup (GRC Board) + Rangka Galvanish m2 21.20 82,500.00 1,749,000.00
3 Pek. List Profil Gypsum T. 8 mm m' 293.40 21,500.00 6,308,100.00
SUB TOTAL 18,518,100.00
VIII. PEK. KONSTRUKSI ATAP & PENUTUP ATAP
1 Pek. Konstruksi Atap Baja Ringan m2 93.25 130,000.00 12,122,500.00
2 Pek. Listplank GRC m' 33.16 86,000.00 2,851,760.00
3 Pek. Talang Jurai Atap (Seng BJLS l 90 cm) m 2.65 64,000.00 169,600.00
3 Pek. Pemasangan Genteng Beton Flat m2 93.25 76,000.00 7,087,000.00
4 Pek. Pemasangan Nok m' 29.85 78,600.00 2,346,210.00
SUB TOTAL 24,577,070.00
IX. PEKERJAAN ALAT PENGGANTUNG
1 Pas. Kunci Pintu Panel ps 9.00 225,000.00 2,025,000.00
2 Pas. Engsel Pintu Panel ps 14.00 64,100.00 897,400.00
3 Pas. Engsel Daun Jendela ps 16.00 57,900.00 926,400.00
4 Pas. Kunci Slot Daun Jendela bh 16.00 39,400.00 630,400.00
5 Pas. Ramskar/Kait Angin bh 16.00 50,900.00 814,400.00
6 Rel pintu Geser Garasi set 1.00 2,500,000.00 2,500,000.00
SUB TOTAL 7,793,600.00
X. PEKERJAAN INSTALASI LISTRIK
1 Instalasi titik lampu ttk 28.00 210,000.00 5,880,000.00
2 Saklar Tunggal sek. Broco bh 10.00 19,500.00 195,000.00
3 Saklar Double sek. Broco bh 6.00 21,500.00 129,000.00
4 Stop kontak sek. Broco bh 10.00 17,500.00 175,000.00
5 Outlet TV bh 2.00 57,500.00 115,000.00
6 Downlight + sl 18 watt bh 15.00 57,000.00 855,000.00
7 Instalsi titik MCB ttk 3.00 210,000.00 630,000.00
8 Box MCB (Presto) unit 1.00 160,000.00 160,000.00
SUB TOTAL 8,139,000.00
XI. PEKERJAAN INSTALASI AIR
1 Pas. Kloset Duduk sek. America standart set 2.00 2,750,000.00 5,500,000.00
2 Pas. Saringan air (floor drain) bh 2.00 67,500.00 135,000.00
3 Pas. Instalasi air bersih PVC 1/2 " Sek. Wavin m' 29.36 13,800.00 405,168.00
4 Pas. Instalasi air kotor PVC 3" Sek. Wavin m' 46.10 55,800.00 2,572,380.00
5 Pas. Instalasi air kotor PVC 4" Sek. Wavin m' 18.60 83,700.00 1,556,820.00
6 Pas. Bak Fiber Uk. 60 x 60 bh 1.00 310,000.00 310,000.00
7 Pas. Bak Shower Sekelas Alco Fiber Florensia set 1.00 1,750,000.00 1,750,000.00
SUB TOTAL 12,229,368.00
XII. PEKERJAAN FINISHING & PENGECATAN
1 Pengecatan dinding tembok (Vinilex) m2 680.23 22,500.00 15,305,105.14
2 Pengecatan List Plester m' 7.56 18,000.00 136,080.00
3 Pengecatan Dak toren ( Waterproof ) m2 13.35 35,500.00 473,925.00
4 Pengecatan plafond Gypsum m2 148.00 33,500.00 4,958,000.00
5 Pek. Melamik Pintu bh 12.00 450,000.00 5,400,000.00
6 Pek. Melamik Kusen Gendong m' 33.00 65,000.00 2,145,000.00
7 Pek. Melamik Kusen Pintu m' 43.46 65,000.00 2,824,900.00
8 Pek. Melamik Kusen Jendela m' 55.50 65,000.00 3,607,500.00
9 Pek. Melamik Daun Jendela m' 37.39 65,000.00 2,430,350.00
N0. URAIAN/ITEM PEKERJAAN SAT VOLUME HRG SATUAN JML HRG
1 2 3 4 5 6

10 Coating batu alam m2 25.50 45,400.00 1,157,700.00


SUB TOTAL 38,438,560.14
XIII. PEKERJAAN PAGAR
1 Pek. Pagar Minimalis rangka Hollow Teras Lt 2. m2 4.50 375,000.00 1,687,500.00
2 Pek. Railing Tangga Minimalis rangka Hollow m2 10.55 375,000.00 3,956,250.00
SUB TOTAL 5,643,750.00
WAKTU DAN PROGRESS PEKERJAAN
RUMAH DI PARONGPONG
TAHUN ANGGARAN 2011

WAKTU PEKERJAAN
NO URAIAN PEKERJAAN BOBOT (%) BULAN I BULAN II
MG 1 MG2 MG3 MG4 MG1 MG2 MG3 MG4

I. PEKERJAAN PERSIAPAN #REF!


II. PEKERJAAN GALIAN DAN URUGAN #REF!
III. PEKERJAAN BETON DAN PONDASI #REF!
IV. PEKERJAAN DINDING DAN PLESTERAN #REF!
V. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!
VI PEKERJAAN LANTAI DAN DINDING KERAMIK #REF!
VII. PEKERJAAN PLAFOND #REF!
VIII. PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP #REF!
IX. PEKERJAAN ALAT PENGGANTUNG #REF!
X. PEKERJAAN INSTALASI LISTRIK #REF!
XI. PEKERJAAN INSTALASI AIR #REF!
XII. PEKERJAAN FINISHING DAN PENGECATAN #REF!
XIII. PEKERJAAN LAIN-LAIN #REF!
TOTAL #REF!
NO. URAIAN UMUM K O E F.
a b c

PEK. KAYU + KONSTRUKSI ATAP


1 1 M3 KUDA-KUDA KAYU LOKAL SETARA KLS.II
Balok kayu Kls II 1.1000 m3
Paku 08 - 12 cm 5.8000 kg
Besi strip 15.0000 kg
Pekerja 4.0000 org.
Tukang kayu 12.0000 org.
Kepala tukang 1.2000 org.
Mandor 0.2000 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

2 1 M3 KUDA-KUDA KAYU LOKAL SETARA KLS.II (BAHAN KAYU LAMA)


Balok kayu Kls II 0.0000 m3
Paku 08 - 12 cm 5.8000 kg
Besi strip 15.0000 kg
Pekerja 4.0000 org.
Tukang kayu 12.0000 org.
Kepala tukang 1.2000 org.
Mandor 0.2000 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

3 1 M3 KUDA-KUDA KAYU BORNEO SUPER


Balok kayu Borneo Super 1.1000 m3
Paku 08 - 12 cm 5.8000 kg
Besi strip 15.0000 kg
Pekerja 4.0000 org.
Tukang kayu 2.0000 org.
Kepala tukang 1.2000 org.
Mandor 0.2000 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

4 1 M3 KUDA-KUDA KAYU KAMPER BANJAR


Balok kayu Kamper 1.1000 m3
Paku 08 - 12 cm 5.8000 kg
Besi strip 15.0000 kg
Pekerja 4.0000 org.
Tukang kayu 12.0000 org.
Kepala tukang 1.2000 org.
Mandor 0.2000 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

5 1 M3 KUDA-KUDA KAYU OVERSTEK / KONSOL (EXSPOSE) KAYU LOKAL KLS.II


Balok kayu Kls II 1.2000 m3
Paku 08 - 12 cm 5.8000 kg
Besi strip 15.0000 kg
Pekerja 4.0000 org.
Tukang kayu 12.0000 org.
Kepala tukang 1.2000 org.
Mandor 0.2000 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

6 1 M2 RANGKA ATAP BARU (KAYU BORNEO)


Kaso 5/7 Kayu Borneo super 0.0140 m3
Reng Kayu 2/3 Borneo super 0.0036 m3
Paku 04 - 10 cm 0.1500 kg
Pekerja 0.1000 org.
Tukang kayu 0.1000 org.
Kepala tukang 0.0100 org.
Mandor 0.0050 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

7 1 M2 RANGKA ATAP BARU (KAYU lokal KLS.II)


Kaso 5/7 Kayu Kayu Lokal Kls.II 0.0140 m3
Reng Kayu 2/3 Kls. II 0.0036 m3
Paku 04 - 10 cm 0.1500 kg
Pekerja 0.1000 org.
Tukang kayu 0.1000 org.
Kepala tukang 0.0100 org.
Mandor 0.0050 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

8 1 M2 RANGKA ATAP RENG 2/3 BARU (KASO KAYU LAMA )


Reng Kayu 2/3 Kls. II 0.0036 m3
Paku 04 - 10 cm 0.1500 kg
Pekerja 0.1000 org.
Tukang kayu 0.1000 org.
Kepala tukang 0.0100 org.
Mandor 0.0050 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

9 1 M1 PEKERJAAN LISPLANK KAYU 3/30 BORNEO


Papan Kayu Borneo 3/30 0.0090 m3
Paku 3 - 7 cm 0.0500 m3
Pekerja 0.1100 org.
Tukang kayu 0.2200 org.
Kepala tukang 0.0220 org.
Mandor 0.0050 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

10 1 M1 PEKERJAAN LISPLANK KAYU 3/20 BORNEO


Papan Kayu Kls. II 3/20 0.0060 m3
Paku 3 - 7 cm 0.0500 m3
Pekerja 0.1100 org.
Tukang kayu 0.2200 org.
Kepala tukang 0.0220 org.
Mandor 0.0050 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

11 1 M1 PEKERJAAN LISPLANK KAYU 3/20 KAYU LOKAL KLS. II


Papan Kayu Kls. II 3/20 0.0060 m3
Paku 3 - 7 cm 0.0500 m3
Pekerja 0.1100 org.
Tukang kayu 0.2200 org.
Kepala tukang 0.0220 org.
Mandor 0.0050 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

12 1 M1 PEKERJAAN FLASHING SENG BJLS


Seng Plat BJLS 30 0.3500 m1
Paku 0.0150 m3
Pekerja 0.0200 org
Tukang 0.0400 org
Kepala Tukang 0.0250 org
Mandor 0.0050 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

13 1 M1 PEKERJAAN TALANG MIRING (SENG BJLS 28)


Seng Plat BJLS 28 0.5000 Lbr
Papan Kayu 3/30 0.0190 m3
Paku 0.0150 m3
Meni besi / Flincoote 0.1500 Kg
Pekerja 0.0400 org
Tukang kayu 0.4000 org
Kepala Tukang 0.0250 org
Mandor 0.0013 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

14 1 M1 PEKERJAAN TALANG DATAR (SENG BJLS 28)


Seng Plat BJLS 28 0.5000 Lbr
Papan Kayu 3/30 0.0096 m3
Paku 0.0150 m3
Meni besi / Flincoote 0.1500 Kg
Pekerja 0.1500 org
Tukang kayu 0.4000 org
Kepala Tukang 0.0250 org
Mandor 0.0013 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

PEK. PENUTUP BIDANG ATAP


15 1 M2 PAS. GENTENG JATIWANGI BARU
Genteng Plentong Press Ex. Jatiwangi 20.0000 bh
Pekerja 0.1500 org.
Tukang kayu 0.0750 org.
Kepala tukang 0.0080 org.
Mandor 0.0080 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

16 1 M2 PAS. GENTENG LAMA


Genteng Plentong Press Ex. Jatiwangi 20.0000 bh
Pekerja 0.1500 org.
Tukang kayu 0.0750 org.
Kepala tukang 0.0080 org.
Mandor 0.0080 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

17 1 M2 PAS. PENGECATAN GENTENG


Cat Genteng 0.2200 kg
Kwass 3-4" 0.0500 bh
Pekerja 0.0750 org.
Tukang 0.1500 org.
Kepala Tukang 0.0080 org.
Mandor 0.0080 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

18 1 M1 PAS. GENTENG BUBUNGAN JATIWANGI


Genteng Bubung Ex. Jatiwangi 5.0000 bh
Pasir Pasang 0.0320 m3
Semen Portland ( PC TYPE I ) 8.0000 kg
Pekerja 0.4000 org.
Tukang batu 0.2000 org.
Kepala tukang 0.0200 org.
Mandor 0.0020 org.
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

PEK. PLAFOND
19 1 M2 PEKERJAAN RANGKA PLAFOND (TANPA PENUTUP) KAYU BARU
Balok Kayu 5/10 dan 5/7 0.0120 m1
Paku 0.1000 m3
Pekerja 0.1500 org
Tukang kayu 0.2500 org
Kepala tukang 0.0250 org
Mandor 0.0750 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

20 1 M2 PEKERJAAN RANGKA PLAFOND (TANPA PENUTUP) KAYU LAMA


Balok Kayu 5/10 dan 5/7 0.0000 m1
Paku 0.1000 m3
Pekerja 0.1500 org
Tukang kayu 0.2500 org
Kepala tukang 0.0250 org
Mandor 0.0750 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

21 1 M2 PENUTUP RANGKA PLAFOND (TRIPLEK 4 MM)


Triplek 4 mm Ukuran 120 x 240 cm 0.3600 lbr
Paku triplek 0.0250 kg
Pekerja 0.0300 org
Tukang kayu 0.1000 org
Kepala tukang 0.0150 org
Mandor 0.0015 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

22 1 M2 PENUTUP RANGKA PLAFOND (HARDPLEK 1X1 TEBAL 5 MM)


Hardplek 1 x 1 m 1.0000 lbr
Paku triplek 0.0250 kg
Pekerja 0.0300 org
Tukang kayu 0.1000 org
Kepala tukang 0.0150 org
Mandor 0.0015 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

23 1 M2 PENUTUP RANGKA PLAFOND (GRC BOARD EX. JAYA BOARD 120 x 240 TEBAL 4 MM
GRC 120x240 0.3600 lbr
Paku triplek 0.0250 kg
Pekerja 0.0300 org
Tukang kayu 0.1000 org
Kepala tukang 0.0150 org
Mandor 0.0015 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

24 1 M1 PAKERJAAN LIST PROFIL U/ PLAFOND Uk. 1/3


List Profil Kayu 1.0500 m1
Paku 0.0500 kg
Pekerja 0.0250 org
Tukang kayu 0.0300 org
Kepala tukang 0.0150 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

PEK. KUSEN PINTU dan JENDELA


25 1 M3 PAKERJAAN KUSEN PINTU DAN JENDELA BAHAN KAMPER SAMARINDA
Balok Kayu Kamper Samarindar Ukuran 6/15 cm 1.1000 M3
Paku 7 s/d 12 cm 2.5000 kg
Lem Kayu 1.0000 kg
Pekerja 6.0000 org
Tukang kayu 18.0000 org
Kepala tukang 2.0000 org
Mandor 0.3000 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

26 1 M3 PAKERJAAN KUSEN PINTU DAN JENDELA BAHAN KAMPER BANJAR


Balok Kayu Kamper Banjar Ukuran 6/15 cm 1.1000 M3
Paku 7 s/d 12 cm 2.5000 kg
Lem Kayu 1.0000 kg
Pekerja 6.0000 org
Tukang kayu 18.0000 org
Kepala tukang 2.0000 org
Mandor 0.3000 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

27 1 M3 PAKERJAAN KUSEN PINTU DAN JENDELA BAHAN BORNEO SUPER


Balok Kayu Kamper Borneo Ukuran 6/15 cm 1.1000 M3
Paku 7 s/d 12 cm 2.5000 kg
Lem Kayu 1.0000 kg
Pekerja 6.0000 org
Tukang kayu 18.0000 org
Kepala tukang 2.0000 org
Mandor 0.3000 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

28 1 M3 PAKERJAAN KUSEN PINTU DAN JENDELA BAHAN KAYU LOKAL KLS.II


Balok Kayu Lokal Kls. II Ukuran 6/15 cm 1.1500 M3
Paku 7 s/d 12 cm 2.5000 kg
Lem Kayu 1.0000 kg
Pekerja 6.0000 org
Tukang kayu 18.0000 org
Kepala tukang 2.0000 org
Mandor 0.3000 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

29 1 M2 PAKERJAAN DAUN PINTU PANEL KAYU KAMPER BANJAR


Papan kayu kamper 0.0400 M3
Paku 7 s/d 12 cm 2.5000 kg
Lem Kayu 1.0000 kg
Pekerja 1.0000 org
Tukang kayu 2.5000 org
Kepala tukang 0.2500 org
Mandor 0.0500 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

30 1 M2 PAKERJAAN DAUN PINTU PANEL KAYU LOKAL KLS. I


Papan kayu Lokal Kls.II 0.0400 M3
Paku 7 s/d 12 cm 2.5000 kg
Lem Kayu 1.0000 kg
Pekerja 1.0000 org
Tukang kayu 2.5000 org
Kepala tukang 0.2500 org
Mandor 0.0500 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

31 1 M2 PAKERJAAN DAUN PINTU DOUBLE PLYWOOD 4 MM RANGKA KAYU LOKAL KLS. II


Papan Kayu Kamper Banjar atau setara Kls. II 0.0196 M3
Paku 1 s/d 3 cm 0.0300 kg
Lem Kayu 0.3000 kg
Ply Wood T. 4 mm 1.0000 lbr
Pekerja 0.6000 org
Tukang kayu 2.0000 org
Kepala tukang 0.2000 org
Mandor 0.0300 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %
32 1 bh DAUN PINTU PANEL Kayu Lokal Kls. II STANDARD UKURAN (71X210 CM)
Papan Kayu Kamper Banjar atau setara Kls. II 0.0596 m3
Paku 1 - 3 cm 0.2250 kg
Lem Putih (Fox) 0.5000 kg
Pekerja 0.6000 org
Tukang Kayu 3.9000 org
Kepala Tukang 0.0260 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

33 2 bh DAUN PINTU PANEL KUPU-KUPU KAYU LOKAL KLS.II STANDARD UKURAN (82X210
Papan Kayu Kamper Banjar atau setara Kls. II 0.1445 m3
Paku 1 - 3 cm 0.4000 kg
Lem Putih (Fox) 0.5000 kg
Pekerja 0.6000 org
Tukang Kayu 3.9000 org
Kepala Tukang 0.0260 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

34 2 bh DAUN PINTU KUPU-KUPU DAN JENDELA KACA KAYU LOKAL KLS.II UK. (72X210 CM
Papan Kayu Kamper Banjar atau setara Kls. II 0.0824 m3
Paku 1 - 3 cm 0.4000 kg
Lem Putih (Fox) 0.5000 kg
Pekerja 0.6000 org
Tukang Kayu 3.9000 org
Kepala Tukang 0.0260 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

35 1 Bh DAUN PINTU RANGKA KAYU BORNEO TRIPLEK 4 MM UKURAN (82X210 cm)


Rangka Kayu Borneo 4/12 0.0355 m3
Triplek 4 mm 2.0000 lbr
Paku 1 - 3 cm 0.2250 kg
Lem Putih (Fox) 0.1000 kg
Pekerja 0.6000 org
Tukang Kayu 3.9000 org
Kepala Tukang 0.0260 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

36 1 Bh DAUN PINTU RANGKA KAYU BORNEO DOUBLE TRIPLEK 4 MM LAPIS SENG PLAT (82
Rangka Kayu Borneo 4/12 0.0355 m3
Triplek 4 mm 2.0000 lbr
Paku 1 - 3 cm 0.2250 kg
Lem Putih (Fox) 0.1000 kg
Seng BJLS L. 90 cm 0.8500 m3
Pekerja 0.6000 org
Tukang Kayu 3.9000 org
Kepala Tukang 0.0260 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

37 1 M2 PEKERJAAN RANGKA JENDELA


Papan 3/7 cm Kayu Lokal Kls.I 0.0350 m3
Paku 1 - 3 cm 0.0075 kg
Lem Putih (Fox) 0.3000 kg
Pekerja 0.1000 org
Tukang Kayu 0.5500 org
Kepala Tukang 0.0500 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

38 1 M2 Pek. JALUSI MATI KAYU LOKAL KLS. II


Kayu Lokal Setara Kls. II, Papan 0.0200 m3
Paku 1- 3 cm 0.0075 kg
Pekerja 0.1000 org
Tukang Kayu 0.5500 org
Kepala Tukang 0.0500 org
Mandor 0.0250 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %
39 1 M2 PARTISI DOUBLE TRIPLEK 4 MM
Kayu 5/10 0.0105 m3
Kayu 5/7 0.0010 m3
Triplek 4 mm Ukuran 120 x 240 cm 0.6900 lbr
Paku 0.1000 kg
Pekerja 0.1500 org
Tukang kayu 0.4000 org
Kepala Tukang 0.0550 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

40 1 m2 PASANG KACA POLOS T. 5 MM


Kaca Polos 5 mm (ASAHI) 1.0000 m2
Pekerja 0.0150 org
Tukang kayu 0.1500 org
Kepala Tukang 0.0150 org
Mandor 0.0008 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

41 1 m2 PASANG KACA POLOS T. 3 MM


Kaca Polos 3 mm (ASAHI) 1.0000 m2
Pekerja 0.0150 org
Tukang kayu 0.1500 org
Kepala Tukang 0.0150 org
Mandor 0.0008 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

42 1 BH PEKERJAAN PASANG KUNCI PINTU DOUBLE SLAAG SEIS STANDARD


Kunci 2 Slaag Silinder SEIS STANDARD 1.0000 bh
Pekerja 0.0100 org
Tukang kayu 0.5000 org
Kepala Tukang 0.0100 org
Mandor 0.0050 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %
43 1 BH PEKERJAAN PASANG KUNCI BULAT 2 SLAAG (KM/WC) ALFA STANDARD
Kunci Bulat 2slaag ALFA Standard 1.0000 bh
Pekerja 0.0050 org
Tukang kayu 0.5000 org
Kepala Tukang 0.0050 org
Mandor 0.0025 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

44 1 BH PEKERJAAN PASANG KUNCI DOUBLE SLAAG ROYAL STANDARD


Kunci Bulat 2slaag SEIS Standard 1.0000 bh
Pekerja 0.0600 org
Tukang kayu 0.6000 org
Kepala Tukang 0.0600 org
Mandor 0.0025 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

45 1 PCS ENGSEL PINTU


Engsel Pintu Unilon 1.0000 Pcs
Pekerja 0.0150 org
Tukang kayu 0.1500 org
Kepala Tukang 0.0150 org
Mandor 0.0008 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

46 1 PCS ENGSEL JENDELA


Engsel Jendela 1.0000 Pcs
Pekerja 0.0100 org
Tukang kayu 0.1000 org
Kepala Tukang 0.0100 org
Mandor 0.0005 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

47 1 BH GRENDEL PINTU
Grendel Pintu 1.0000 bh
Pekerja 0.0200 org
Tukang kayu 0.2000 org
Kepala Tukang 0.0200 org
Mandor 0.0010 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

48 1 BH GRENDEL JENDELA
Grendel Jendela 1.0000 bh
Pekerja 0.0150 org
Tukang kayu 0.1500 org
Kepala Tukang 0.0150 org
Mandor 0.0010 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

49 1 BH SPRING KNIP
Spring Knip 1.0000 bh
Pekerja 0.0150 org
Tukang kayu 0.1500 org
Kepala Tukang 0.0150 org
Mandor 0.0008 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

50 1 BH HAK ANGIN JENDELA


Hak Angin Kait Biasa 1.0000 bh
Pekerja 0.0150 org
Tukang kayu 0.1500 org
Kepala Tukang 0.0150 org
Mandor 0.0008 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

51 1 BH PASANG TARIKAN JENDELA


Tarikan Jendela Biasa 1.0000 bh
Pekerja 0.0150 org
Tukang kayu 0.1500 org
Kepala Tukang 0.0150 org
Mandor 0.0008 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

52 1 UNIT KUSEN PINTU TYPE-P1


Balok Kayu Kls. II 6/15+Jalusi Kayu 0.0765 m3
Besi Angkur 6.0000 bh
Neut Beton 2.0000 ls
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

53 1 UNIT KUSEN PINTU TYPE-P2


Balok Kayu Kls. II 6/15+Jalusi Kayu 0.0888 m3
Besi Angkur 6.0000 bh
Neut Beton 2.0000 ls
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

54 1 UNIT KUSEN PINTU TYPE-P3


Balok Kayu Kls. II 6/15+Jalusi Kayu 0.0733 m3
Besi Angkur 6.0000 bh
Neut Beton 2.0000 ls
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

55 1 UNIT KUSEN PINTU TYPE-P4


Balok Kayu Kls. II 6/15 0.0482 m3
Besi Angkur 6.0000 bh
Neut Beton 2.0000 ls
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

56 1 UNIT KUSEN PINTU TYPE-PJ1


Balok Kayu Kls. II 6/15+Jalusi 2/15 0.1587 m3
Besi Angkur 6.0000 bh
Neut Beton 2.0000 ls
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

57 1 UNIT KUSEN PINTU TYPE-PJ2


Balok Kayu Kls. II 6/15+Jalusi 2/15 0.1215 m3
Besi Angkur 6.0000 bh
Neut Beton 2.0000 ls
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

58 1 UNIT KUSEN JENDELA TYPE J1


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.1368 m3
Besi Angkur 4.0000 bh
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

59 1 UNIT KUSEN JENDELA TYPE J2


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.1444 m3
Besi Angkur 4.0000 bh
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

60 1 UNIT KUSEN JENDELA TYPE J3


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.0896 m3
Besi Angkur 4.0000 bh
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

61 1 UNIT KUSEN JENDELA TYPE J4


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.0952 m3
Besi Angkur 4.0000 bh
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

62 1 UNIT KUSEN JENDELA TYPE J5


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.0620 m3
Besi Angkur 4.0000 bh
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

63 1 UNIT KUSEN JENDELA TYPE J6


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.0658 m3
Besi Angkur 4.0000 bh
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

64 1 UNIT KUSEN JENDELA TYPE BV-1


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.0374 m3
Besi Angkur 4.0000 bh
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

65 1 UNIT KUSEN JENDELA TYPE BV-2


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.0591 m3
Besi Angkur 4.0000 bh
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

66 1 UNIT KUSEN JENDELA TYPE BV-3


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.0761 m3
Besi Angkur 4.0000 bh
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

67 1 UNIT KUSEN ANGIN-ANGIN (AMPIG)


Kusen Kayu Lokal Kls. II 6/15+Jalusi Kayu 0.0377 m3
Besi Angkur 3.0000 m2
Upah Pasang 1.0000 ls
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

PEK. SANITARY
68 1 UNIT CLOSET JONGKOK
Closet Jongkok Keramik Standar Putih 1.0000 bh
Semen Portland ( PC TYPE I ) 6.0000 kg
Pasir Pasang 0.0500 m2
Semen Warna Setara Mitsubishi 0.3000 kg
Pekerja 0.2400 org
Tukang batu 0.4800 org
Kepala tukang 0.1050 org
Alat bantu 0.0600 %
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

69 1 UNIT BAK MANDI FIBER GLASS


Bak Air Mandi 1.0000 bh
Semen Portland ( PC TYPE I ) 60.0000 kg
Pasir Pasang 0.2500 m2
Semen Warna Setara Mitsubishi 1.0000 kg
Bata Merah Bakar (Kw. 1) 70.0000 bh
Pekerja 0.5600 org
Tukang batu 1.2000 org
Kepala tukang 0.2100 org
Alat bantu 0.1800 %
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

70 1 M1 PEKERJAAN PEMASANGAN PIPA PVC Ø 1/2" Tipe AW (JARINGAN AIR BERSIH)


Pipa PVC 1.2000 m1
Perlengkapan 35.0000 %
Pekerja 0.0360 org
Tukang Pipa 0.0600 org
Kepala Tukang 0.0060 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

71 1 M1 PEKERJAAN PEMASANGAN PIPA PVC Ø 3/4" Tipe AW (JARINGAN AIR BERSIH)


Pipa PVC 1.2000 m1
Perlengkapan 35.0000 %
Pekerja 0.0360 org
Tukang Pipa 0.0600 org
Kepala Tukang 0.0060 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

72 1 M1 PEKERJAAN PEMASANGAN PIPA PVC Ø 3" Tipe AW (JARINGAN AIR KOTOR)


Pipa PVC 1.2000 m1
Perlengkapan 35.0000 %
Pekerja 0.0810 org
Tukang Pipa 0.1350 org
Kepala Tukang 0.0135 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

73 1 M1 PEKERJAAN PEMASANGAN PIPA PVC Ø 4" Tipe AW (JARINGAN AIR KOTOR)


Pipa PVC 1.2000 m1
Perlengkapan 35.0000 %
Pekerja 0.0810 org
Tukang Pipa 0.1350 org
Kepala Tukang 0.0135 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

74 1 UNIT WASHTAFEL
Washtafel Lengkap Ex. INA 1.0000 bh
Perlengkapan 12.0000 %
Semen abu-abu 6.0000 kg
Pasir Pasang 0.0100 m3
Pekerja 1.2000 org
Tukang Batu / Pipa 1.4500 org
Kepala Tukang 0.1500 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %

75 1 UNIT PASANG URINOIR


Urinoir lengkap Ex. INA 1.0000 bh
Perlengkapan 30.0000 %
Semen Portland ( TYPE I ) 6.0000 kg
Pasir Pasang 0.0100 m3
Pekerja 1.0000 org
Tukang Batu / Pipa 1.0000 org
Kepala Tukang 0.1000 org
Jumlah Harga Satuan
PPN 10%
Jumlah Total
LANTAI
GROUND FLOOR
LEVEL 2 ( + 3.60 m) 1.0900 %
HARGA HARGA SATUAN
(Rp) BAHAN UPAH ALAT
d e = (c x d) f = (c x d) g = (c x d)

SK.SNI T-2001 & PKKI NI-5


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001 & PKKI NI-5


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001 & PKKI NI-5


2,750,000.00 3,025,000.00 - -
14,900.00 86,420.00 - -
15,800.00 237,000.00 - -
45,000.00 - 180,000.00 -
60,000.00 - 120,000.00 -
70,000.00 - 84,000.00 -
80,000.00 - 16,000.00 -
Harga Satuan 3,348,420.00 400,000.00 -
334,842.00 - -
3,683,262.00 400,000.00 -
SK.SNI T-2001 & PKKI NI-5
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

AYU LOKAL KLS.II SK.SNI T-2001 & PKKI NI-5


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001 & PKKI NI-5


2,750,000.00 38,500.00 - -
2,750,000.00 9,900.00 - -
16,800.00 2,520.00 - -
45,000.00 - 4,500.00 -
60,000.00 - 6,000.00 -
70,000.00 - 700.00 -
80,000.00 - 400.00 -
Harga Satuan 50,920.00 11,600.00 -
5,092.00 - -
56,012.00 11,600.00 -

SK.SNI T-2001 & PKKI NI-5


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001 & PKKI NI-5


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001 & PKKI NI-5


2,750,000.00 24,750.00 - -
20,000.00 1,000.00 - -
45,000.00 - 4,950.00 -
60,000.00 - 13,200.00 -
70,000.00 - 1,540.00 -
80,000.00 - 400.00 -
Harga Satuan 25,750.00 20,090.00 -
2,575.00 - -
28,325.00 20,090.00 -

SK.SNI T-2001 & PKKI NI-5


2,750,000.00 16,500.00 - -
20,000.00 1,000.00 - -
45,000.00 - 4,950.00 -
60,000.00 - 13,200.00 -
70,000.00 - 1,540.00 -
80,000.00 - 400.00 -
Harga Satuan 17,500.00 20,090.00 -
1,750.00 - -
19,250.00 20,090.00 -
SK.SNI T-2001 & PKKI NI-5
- - - -
20,000.00 1,000.00 - -
45,000.00 - 4,950.00 -
60,000.00 - 13,200.00 -
70,000.00 - 1,540.00 -
80,000.00 - 400.00 -
Harga Satuan 1,000.00 20,090.00 -
100.00 - -
1,100.00 20,090.00 -

SK.SNI T-2001
- - - -
20,000.00 300.00 - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan 300.00 - -
30.00 - -
330.00 - -

SK.SNI T-2001
47,500.00 23,750.00 - -
2,750,000.00 52,250.00 - -
20,000.00 300.00 - -
30,000.00 4,500.00 - -
45,000.00 - 1,800.00 -
60,000.00 - 24,000.00 -
70,000.00 - 1,750.00 -
80,000.00 - 100.00 -
Harga Satuan 80,800.00 27,650.00 -
8,080.00 - -
88,880.00 27,650.00 -

SK.SNI T-2001
- - - -
- - - -
20,000.00 300.00 - -
30,000.00 4,500.00 - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan 4,800.00 - -
480.00 - -
5,280.00 - -

SK.SNI T-2001 & PBI 1991


3,700.00 74,000.00 - -
45,000.00 - 6,750.00 -
65,000.00 - 4,875.00 -
70,000.00 - 560.00 -
80,000.00 - 640.00 -
Harga Satuan 74,000.00 12,825.00 -
7,400.00 - -
81,400.00 12,825.00 -

SK.SNI T-2001 & PBI 1991


- - - -
45,000.00 - 6,750.00 -
65,000.00 - 4,875.00 -
70,000.00 - 560.00 -
80,000.00 - 640.00 -
Harga Satuan - 12,825.00 -
- - -
- 12,825.00 -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
11,000.00 55,000.00 - -
150,000.00 4,800.00 - -
1,250.00 10,000.00 - -
45,000.00 - 18,000.00 -
65,000.00 - 13,000.00 -
70,000.00 - 1,400.00 -
80,000.00 - 160.00 -
Harga Satuan 69,800.00 32,560.00 -
6,980.00 - -
76,780.00 32,560.00 -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

OARD 120 x 240 TEBAL 4 MM) SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

PER SAMARINDA SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

PER BANJAR SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

NEO SUPER SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

U LOKAL KLS.II SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

ANGKA KAYU LOKAL KLS. II SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -
RAN (71X210 CM) SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

TANDARD UKURAN (82X210 CM) SK.SNI T-2001


- - - -
- - - -
- - - -
- - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

OKAL KLS.II UK. (72X210 CM) SK.SNI T-2001


- - - -
- - - -
- - - -
- - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

KURAN (82X210 cm) SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

K 4 MM LAPIS SENG PLAT (82X210 cm) SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -
SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

IS STANDARD SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -
ALFA STANDARD SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -
SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
12,500.00 12,500.00 - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan 12,500.00 - -
1,250.00 - -
13,750.00 - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
4,500.00 4,500.00 - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan 4,500.00 - -
450.00 - -
4,950.00 - -

SK.SNI T-2001
- - - -
- - - -
1,500.00 3,000.00 - -
7,500.00 - 7,500.00 -
Harga Satuan 3,000.00 7,500.00 -
300.00 - -
3,300.00 7,500.00 -

SK.SNI T-2001
- - - -
- - - -
1,500.00 3,000.00 - -
7,500.00 - 7,500.00
Harga Satuan 3,000.00 7,500.00 -
300.00 - -
3,300.00 7,500.00 -

SK.SNI T-2001
- - - -
- - - -
1,500.00 3,000.00 - -
7,500.00 - 7,500.00 -
Harga Satuan 3,000.00 7,500.00 -
300.00 - -
3,300.00 7,500.00 -

SK.SNI T-2001
- - - -
- - - -
1,500.00 3,000.00 - -
7,500.00 - 7,500.00
Harga Satuan 3,000.00 7,500.00 -
300.00 - -
3,300.00 7,500.00 -
SK.SNI T-2001
- - - -
- - - -
1,500.00 3,000.00 - -
10,000.00 - 10,000.00 -
Harga Satuan 3,000.00 10,000.00 -
300.00 - -
3,300.00 10,000.00 -

SK.SNI T-2001
- - - -
- - - -
1,500.00 3,000.00 - -
10,000.00 - 10,000.00
Harga Satuan 3,000.00 10,000.00 -
300.00 - -
3,300.00 10,000.00 -

SK.SNI T-2001
- - - -
- - - -
10,000.00 - 10,000.00 -
Harga Satuan - 10,000.00 -
- - -
- 10,000.00 -

SK.SNI T-2001
- - - -
- - - -
10,000.00 - 10,000.00 -
Harga Satuan - 10,000.00 -
- - -
- 10,000.00 -

SK.SNI T-2001
- - - -
- - - -
7,500.00 - 7,500.00 -
Harga Satuan - 7,500.00 -
- - -
- 7,500.00 -

SK.SNI T-2001
- - - -
- - - -
7,500.00 - 7,500.00 -
Harga Satuan - 7,500.00 -
- - -
- 7,500.00 -

SK.SNI T-2001
- - - -
- - - -
7,500.00 - 7,500.00 -
Harga Satuan - 7,500.00 -
- - -
- 7,500.00 -

SK.SNI T-2001
- - - -
- - - -
7,500.00 - 7,500.00 -
Harga Satuan - 7,500.00 -
- - -
- 7,500.00 -

SK.SNI T-2001
- - - -
- - - -
5,000.00 - 5,000.00 -
Harga Satuan - 5,000.00 -
- - -
- 5,000.00 -

SK.SNI T-2001
- - - -
- - - -
5,000.00 - 5,000.00 -
Harga Satuan - 5,000.00 -
- - -
- 5,000.00 -

SK.SNI T-2001
- - - -
- - - -
5,000.00 - 5,000.00 -
Harga Satuan - 5,000.00 -
- - -
- 5,000.00 -

SK.SNI T-2001
- - - -
- - - -
7,500.00 - - 7,500.00
Harga Satuan - - 7,500.00
- - -
- - 7,500.00

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

ARINGAN AIR BERSIH) SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

ARINGAN AIR BERSIH) SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

RINGAN AIR KOTOR) SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

RINGAN AIR KOTOR) SK.SNI T-2001


- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -

SK.SNI T-2001
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Harga Satuan - - -
- - -
- - -
JUMLAH
(Rp)
h = (e + f + g)

T-2001 & PKKI NI-5


-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001 & PKKI NI-5


-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001 & PKKI NI-5


3,025,000.00
86,420.00
237,000.00
180,000.00
120,000.00
84,000.00
16,000.00
3,748,420.00
334,842.00
4,083,262.00
TOTAL
4,083,262.00
4,450,755.58

T-2001 & PKKI NI-5


-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001 & PKKI NI-5


-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001 & PKKI NI-5


38,500.00
9,900.00
2,520.00
4,500.00
6,000.00
700.00
400.00
62,520.00
5,092.00
67,612.00
TOTAL
67,612.00
73,697.08

T-2001 & PKKI NI-5


-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001 & PKKI NI-5


-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001 & PKKI NI-5


24,750.00
1,000.00
4,950.00
13,200.00
1,540.00
400.00
45,840.00
2,575.00
48,415.00
TOTAL
48,415.00
52,772.35

T-2001 & PKKI NI-5


16,500.00
1,000.00
4,950.00
13,200.00
1,540.00
400.00
37,590.00
1,750.00
39,340.00
TOTAL
39,340.00
42,880.60

T-2001 & PKKI NI-5


-
1,000.00
4,950.00
13,200.00
1,540.00
400.00
21,090.00
100.00
21,190.00
TOTAL
21,190.00
23,097.10

T-2001
-
300.00
-
-
-
-
300.00
30.00
330.00
TOTAL
330.00
359.70

T-2001
23,750.00
52,250.00
300.00
4,500.00
1,800.00
24,000.00
1,750.00
100.00
108,450.00
8,080.00
116,530.00
TOTAL
116,530.00
127,017.70

T-2001
-
-
300.00
4,500.00
-
-
-
-
4,800.00
480.00
5,280.00
TOTAL
5,280.00
5,755.20

T-2001 & PBI 1991


74,000.00
6,750.00
4,875.00
560.00
640.00
86,825.00
7,400.00
94,225.00
TOTAL
94,225.00
102,705.25

T-2001 & PBI 1991


-
6,750.00
4,875.00
560.00
640.00
12,825.00
-
12,825.00
TOTAL
12,825.00
13,979.25

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
55,000.00
4,800.00
10,000.00
18,000.00
13,000.00
1,400.00
160.00
102,360.00
6,980.00
109,340.00
TOTAL
109,340.00
119,180.60

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-
T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
TOTAL
-
-
T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-
T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
12,500.00
-
-
-
-
12,500.00
1,250.00
13,750.00
TOTAL
13,750.00
14,987.50

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
4,500.00
-
-
-
-
4,500.00
450.00
4,950.00
TOTAL
4,950.00
5,395.50

T-2001
-
-
3,000.00
7,500.00
10,500.00
300.00
10,800.00
TOTAL
10,800.00
11,772.00

T-2001
-
-
3,000.00
7,500.00
10,500.00
300.00
10,800.00
TOTAL
10,800.00
11,772.00

T-2001
-
-
3,000.00
7,500.00
10,500.00
300.00
10,800.00
TOTAL
10,800.00
11,772.00

T-2001
-
-
3,000.00
7,500.00
10,500.00
300.00
10,800.00
TOTAL
10,800.00
11,772.00

T-2001
-
-
3,000.00
10,000.00
13,000.00
300.00
13,300.00
TOTAL
13,300.00
14,497.00

T-2001
-
-
3,000.00
10,000.00
13,000.00
300.00
13,300.00
TOTAL
13,300.00
14,497.00

T-2001
-
-
10,000.00
10,000.00
-
10,000.00
TOTAL
10,000.00
10,900.00

T-2001
-
-
10,000.00
10,000.00
-
10,000.00
TOTAL
10,000.00
10,900.00

T-2001
-
-
7,500.00
7,500.00
-
7,500.00
TOTAL
7,500.00
8,175.00

T-2001
-
-
7,500.00
7,500.00
-
7,500.00
TOTAL
7,500.00
8,175.00

T-2001
-
-
7,500.00
7,500.00
-
7,500.00
TOTAL
7,500.00
8,175.00

T-2001
-
-
7,500.00
7,500.00
-
7,500.00
TOTAL
7,500.00
8,175.00

T-2001
-
-
5,000.00
5,000.00
-
5,000.00
TOTAL
5,000.00
5,450.00

T-2001
-
-
5,000.00
5,000.00
-
5,000.00
TOTAL
5,000.00
5,450.00

T-2001
-
-
5,000.00
5,000.00
-
5,000.00
TOTAL
5,000.00
5,450.00

T-2001
-
-
7,500.00
7,500.00
-
7,500.00
TOTAL
7,500.00
8,175.00

T-2001
-
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

T-2001
-
-
-
-
-
-
-
-
-
-
TOTAL
-
-

Anda mungkin juga menyukai