Total (kg)
Nama jml. Tul. begisting
berat
Ø besi kg besi Jml. Pjg. Pjg.
No dimensi beton(m) Kg besi
(m) pls / m1 Begel Btg/m3 Besi/m3
Balok/Kolom (bh) berat
SLOOF
Begel 0.0080 0.39 0.125 101 12.500 107.060 42.261 131.078 10.00
1 0.20 0.40 0.0120 0.89 8 12.500 100.000 88.817
SL1 20/40
0.0130 1.04 0 12.500 - -
KOLOM
Begel 0.0080 0.39 0.125 129 16.000 110.940 43.793 157.479 16.00
1 0.25 0.25 0.0120 0.89 8 16.000 128.000 113.686
K1 25/25
0.0100 0.62 0 16.000 - -
Begel 0.0080 0.39 0.125 201 25.000 132.660 52.367 230.001 20.00
2 0.20 0.20 0.0120 0.89 8 25.000 200.000 177.634
K2 20/20
0.0100 0.62 0 25.000 - -
Begel 0.0100 0.62 0.125 34 4.167 63.240 39.006 39.006 8.33
3 0.40 0.60 0.0190 2.23 10 4.167 41.667 92.775 92.775
K3 40/60
0.0100 0.62 0 4.167 - -
Begel 0.0080 0.39 0.125 129 16.000 110.940 43.793 43.793 16.00
4 0.25 0.25 0.0130 1.04 8 16.000 128.000 133.423 133.423
K4 25/25
0.0100 0.62 0 16.000 - -
Begel 0.0060 0.22 0.150 371 55.556 148.400 32.951 170.015 16.67
5 0.12 0.15 0.0100 0.62 4 55.556 222.222 137.063
Kp 12/15
0.0100 0.62 0 55.556 - -
BALOK
%
1.13%
1.45%
2.26%
1.18%
1.70%
1.75%
PEKERJAAN POER
BERAT BESI PER-M³ BETON
115.783 BAWAH
39.337 BAWAH
DAFTAR HARGA SATUAN UPAH & BAHAN
5 Tanah urug
6 Ijuk kg ###
10 Wiremesh kg
No. JENIS BAHAN SAT HARGA
13 Kawat las kg
###
IV KAYU ###
###
5 Keramik Dinding 30 x 60 cm m2
14 Aluminium strip t. 10 cm m1
18 MDF 3 mm lbr
21 Horizontal Blind m2
22 Plat steinless 2 cm m1
23 Plat steinless 10 cm m1
###
No. JENIS BAHAN SAT HARGA
###
7 Kuas / roll bh
18 Alkali siller kg
20 Pewarna (IMPRA) kg
21 Shanding (IMPRA) kg
23 Coumpond bh ###
28 Meni kg ###
29 Thiner B ltr
No. JENIS BAHAN SAT HARGA
31 Solar ltr
###
1 Paku kg ###
3 Sekrup bh ###
5 Ramset bh ###
6 Screw bh ###
###
6 Handle pintu electronic lock type EL 9102 MF FIN PASS (DEKSON) terpasang bh
###
5 Flexible 20 mm m1 Rp 7,462.00
10 Isolator bh Rp 6,487.00
Pek. pasang meja pendaftaran multiplek finishing HPL lengkap dengan aksesories
1 m1
terpasang ( sesuai gambar )
Pek. pasang back droop pendaftaran multiplek finishing HPL lengkap dengan
2 m2
aksesories terpasang termasuk huruf steinless dan penerangan ( sesuai gambar )
Sewa pagar pengaman proyek dari seng gelombang bekas layak pakai rangka
1 m1
kayu meranti tinggi 2,4 m difinish cat.
Pek. pasang railing raamp (Tinggi 80 cm) pipa steinless pipa steinless Ø 1" + pipa
2 m1
steinless Ø 2"
Pek. pasang sunscreen hollow galvanis 30x60 tb. 0,9 mm finishing cat termasuk
3 m2
material pendukung terpasang
4 Penutup atap Upvc warna Milky White + rangka hollow 50x100 mm finishing cat m2
Pek. pasang railing hollow galvanis 40.60 mm + 40.40 mm, , finshing cat ( VOID )
5 m2
Tinggi = 100 cm
1 Sewa Excavator Std - min 8 jam termasuk Mod & Demob, operator,BBM jam
3 Konsultasi K3 org/jam
9 Masker bh
10 Kacamata pengaman bh
12 Jaring pengaman bh
13 BPJS ketenagakerjaan ls
16 Rambu Peringatan; bh
5 Tanah urug
6 Ijuk kg ###
10 Wiremesh kg
3 Kawat las kg
###
IV KAYU ###
###
5 Keramik Dinding 30 x 60 cm m2
10 Aluminium strip t. 10 cm m1
9 Wallboard type modified V-Shape L. 400 mm, tb. 9 mm, P. 300 cm Merk SHUNDA m2
13 MDF 3 mm lbr
16 Horizontal Blind m2
17 Plat steinless 2 cm m1
18 Plat steinless 10 cm m1
No. JENIS BAHAN SAT HARGA
16 Lem vinnyl kg
17 List Kayu m1
###
###
7 Kuas / roll bh
18 Alkali siller kg
20 Pewarna (IMPRA) kg
21 Shanding (IMPRA) kg
No. JENIS BAHAN SAT HARGA
23 Coumpond bh ###
28 Meni kg ###
29 Thiner B ltr
31 Solar ltr
###
1 Paku kg ###
3 Sekrup bh ###
5 Ramset bh ###
6 Screw bh ###
###
6 Handle pintu electronic lock type EL 9102 MF FIN PASS (DEKSON) terpasang bh
###
5 Flexible 20 mm m1
7 Klem O 20 mm + Fisher bh
8 Inbow Does bh
9 T Doos Pvc bh
10 Isolator bh
17 Saklar Ganda bh
18 Saklar Tunggal bh
19 Stop Kontak bh
20 Ftting Plafond bh
Pek. pasang meja pendaftaran multiplek finishing HPL lengkap dengan aksesories
1 m1
terpasang ( sesuai gambar )
Pek. pasang back droop pendaftaran multiplek finishing HPL lengkap dengan
2 m2
aksesories terpasang termasuk huruf steinless dan penerangan ( sesuai gambar )
Sewa pagar pengaman proyek dari seng gelombang bekas layak pakai rangka
1 m1
kayu meranti tinggi 2,4 m difinish cat.
Pek. pasang railing raamp (Tinggi 80 cm) pipa steinless pipa steinless Ø 1" + pipa
2 m1
steinless Ø 2"
Pek. pasang sunscreen hollow galvanis 30x60 tb. 0,9 mm finishing cat termasuk
3 m2
material pendukung terpasang
4 Penutup atap Upvc warna Milky White + rangka hollow 50x100 mm finishing cat m2
Pek. pasang railing hollow galvanis 40.60 mm + 40.40 mm, , finshing cat ( VOID )
5 m2
Tinggi = 100 cm
No. JENIS BAHAN SAT HARGA
1 Sewa Excavator Std - min 8 jam termasuk Mod & Demob, operator,BBM jam
3 Konsultasi K3 org/jam
9 Masker bh
10 Kacamata pengaman bh
12 Jaring pengaman bh
13 BPJS ketenagakerjaan ls
16 Rambu Peringatan; bh
1 Mandor hari
18 Pekerja hari
ANALISA PEKERJAAN GEDUNG 4 LANTAI
PEKERJAAN PERSIAPAN
1 Bor strous Ø 30 / m1
Upah : An. HSPK : 25 . 02 . 01 . 24
Tukang bor 0.0240 hari Rp - Rp -
Pekerja 0.4800 hari Rp 120,000.00 Rp 57,600.00
Jumlah Upah Rp 57,600.00
Alat :
Sewa Bor strous 0.4000 hari Rp - Rp -
Jumlah Bahan Rp -
Jumlah Total Harga Satuan Rp 57,600.00
Over Head + Profit 10% Rp 5,760.00
Jumlah Total Rp 63,360.00
2 Striping Tanah Dengan Alat Berat / m3
Upah : An.HSPK 24.01.02.11
Mandor 0.0070 hari Rp - Rp -
Pekerja 0.2260 hari Rp 120,000.00 Rp 27,120.00
Jumlah Upah Rp 27,120.00
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Peralatan :
Sewa Excavator Std - min 8 jam termasuk Mod & Demob, operator,BBM 0.0670 jam Rp - Rp -
Jumlah Peralatan Rp -
Jumlah Total Harga Satuan Rp 27,120.00
Over Head + Profit 10% Rp 2,712.00
Jumlah Total Rp 29,832.00
3 Pengkeprasan Tanah Dengan Alat Berat / m3
Upah : An. ( SNI 2835:2008 ) 6.1 ( Revisi 2008 )
Mandor 0.1250 hari Rp 175,000.00 Rp 21,875.00
Pekerja 0.1250 hari Rp 120,000.00 Rp 15,000.00
Jumlah Total Rp 36,875.00
Peralatan :
Sewa Excavator Std - min 8 jam termasuk Mod & Demob, operator,BBM 0.0535 jam Rp - Rp -
Bahan :
Steinslag 2/3 cm 1.2000 m3 Rp - Rp -
Jumlah Bahan Rp -
Jumlah Total Upah Dan Bahan Rp 37,750.00
Over Head + Profit 10% Rp 3,775.00
Jumlah Total Rp 41,525.00
12 Memasang Lapisan Ijuk Tebal 10 cm , Untuk Bidang Resapan / m2
Upah : An. ( SNI 2835:2008 ) 6.14 ( Revisi 2008 )
Mandor 0.0150 hari Rp 175,000.00 Rp 2,625.00
Pekerja 0.1500 hari Rp 120,000.00 Rp 18,000.00
Jumlah Upah Rp 20,625.00
Bahan :
Ijuk 6.0000 kg Rp - Rp -
Jumlah Bahan Rp -
Jumlah Total Upah Dan Bahan Rp 20,625.00
Over Head + Profit 10% Rp 2,062.50
Jumlah Total Rp 22,687.50
PEKERJAAN PASANGAN
Upah :
Mandor 0.0800 hari Rp 175,000.00 Rp 14,000.00
Kepala tukang batu 0.0250 hari Rp - Rp -
Tukang batu 0.2500 hari Rp - Rp -
Pekerja 1.6500 hari Rp 120,000.00 Rp 198,000.00
Jumlah Upah Rp 212,000.00
Jumlah Total Bahan Dan Upah Rp 212,000.00
Over Head + Profit 10% Rp 21,200.00
Jumlah Total Rp 233,200.00
5 Pekerjaan Pembesian Polos (10 kg)
Bahan : An. ( SNI 7394:2008 ) 6.17 ( Revisi 2008 )
Besi U-24 (Polos) 10.5000 kg Rp - Rp -
Kawat bendrat 0.1500 kg Rp - Rp -
Jumlah Bahan / 10 Kg Rp -
Jumlah Bahan / 1 Kg Rp -
Upah :
Mandor 0.0040 hari Rp 175,000.00 Rp 700.00
Kepala tukang besi 0.0070 hari Rp - Rp -
Tukang besi 0.0700 hari Rp - Rp -
Pekerja 0.0700 hari Rp 120,000.00 Rp 8,400.00
Jumlah Upah / 10 Kg Rp 9,100.00
Jumlah Upah / 1 Kg Rp 910.00
Jumlah Total Bahan Dan Upah / 10 Kg Rp 9,100.00
Jumlah Total Bahan Dan Upah / 1 Kg Rp 910.00
Over Head + Profit 10% Rp 91.00
Jumlah Total Rp 1,001.00
6 Pekerjaan Pembesian Ulir (10 kg)
Bahan : An. ( SNI 7394:2008 ) 6.17 ( Revisi 2008 )
Besi U-39 (Ulir ) 10.5000 kg Rp - Rp -
Kawat bendrat 0.1500 kg Rp - Rp -
Jumlah Bahan / 10 Kg Rp -
Jumlah Bahan / 1 Kg Rp -
Upah :
Mandor 0.0040 hari Rp 175,000.00 Rp 700.00
Kepala tukang besi 0.0070 hari Rp - Rp -
Tukang besi 0.0700 hari Rp - Rp -
Pekerja 0.0700 hari Rp 120,000.00 Rp 8,400.00
Jumlah Upah / 10 Kg Rp 9,100.00
Jumlah Upah / 1 Kg Rp 910.00
Jumlah Total Bahan Dan Upah / 10 Kg Rp 9,100.00
Jumlah Total Bahan Dan Upah / 1 Kg Rp 910.00
Over Head + Profit 10% Rp 91.00
Jumlah Total Rp 1,001.00
7 Membuat Begisting Pondasi / m2
Bahan : An. ( SNI 7394:2008 ) 6.20 ( Revisi 2008 )
Kayu Meranti Begesting (MC) 0.0400 m3 Rp - Rp -
Minyak begisting 0.1000 ltr Rp - Rp -
Paku 0.3000 kg Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.0260 hari Rp 175,000.00 Rp 4,550.00
Kepala tukang kayu 0.0260 hari Rp - Rp -
Tukang kayu 0.2600 hari Rp - Rp -
Pekerja 0.5200 hari Rp 120,000.00 Rp 62,400.00
Jumlah Upah Rp 66,950.00
Jumlah Total Bahan Dan Upah Rp 66,950.00
Over Head + Profit 10% Rp 6,695.00
Jumlah Total Rp 73,645.00
8 Membuat Begisting Sloof / m2
Bahan : An. ( SNI 7394:2008 ) 6.21 ( Revisi 2008 )
Kayu Meranti Begesting (MC) 0.0450 m3 Rp - Rp -
Minyak begisting 0.1000 lbr Rp - Rp -
Paku 0.3000 kg Rp - Rp -
Jumlah Bahan Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Upah :
Mandor 0.0260 hari Rp 175,000.00 Rp 4,550.00
Kepala tukang kayu 0.0260 hari Rp - Rp -
Tukang kayu 0.2600 hari Rp - Rp -
Pekerja 0.5200 hari Rp 120,000.00 Rp 62,400.00
Jumlah Upah Rp 66,950.00
Jumlah Total Bahan Dan Upah Rp 66,950.00
Over Head + Profit 10% Rp 6,695.00
Jumlah Total Rp 73,645.00
9 Membuat Begisting Kolom / m2
Bahan : An. ( SNI 7394:2008 ) 6.22 ( Revisi 2008 )
Kayu Meranti Begesting (MC) 0.0400 m3 Rp - Rp -
Minyak begisting 0.2000 ltr Rp - Rp -
Perancah kayu (MC) 0.0150 m3 Rp - Rp -
Multiplek 9 mm uk. 2.4 x 1.22 0.3500 lbr Rp - Rp -
Dolken Kayu gelam 1.0000 btg Rp - Rp -
Paku 0.4000 kg Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.0330 hari Rp 175,000.00 Rp 5,775.00
Kepala tukang kayu 0.0330 hari Rp - Rp -
Tukang kayu 0.3300 hari Rp - Rp -
Pekerja 0.6600 hari Rp 120,000.00 Rp 79,200.00
Jumlah Upah Rp 84,975.00
Jumlah Total Bahan Dan Upah Rp 84,975.00
Over Head + Profit 10% Rp 8,497.50
Jumlah Total Rp 93,472.50
10 Membuat Begisting Balok / m2
Bahan : An. ( SNI 7394:2008 ) 6.23 ( Revisi 2008 )
Kayu Meranti Begesting (MC) 0.0400 m3 Rp - Rp -
Minyak begisting 0.2000 ltr Rp - Rp -
Perancah kayu (MC) 0.0090 m3 Rp - Rp -
Multiplek 9 mm uk. 2.4 x 1.22 0.3500 lbr Rp - Rp -
Dolken Kayu gelam 1.0000 btg Rp - Rp -
Paku 0.4000 kg Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.0330 hari Rp 175,000.00 Rp 5,775.00
Kepala tukang kayu 0.0330 hari Rp - Rp -
Tukang kayu 0.3300 hari Rp - Rp -
Pekerja 0.6600 hari Rp 120,000.00 Rp 79,200.00
Jumlah Upah Rp 84,975.00
Jumlah Total Bahan Dan Upah Rp 84,975.00
Over Head + Profit 10% Rp 8,497.50
Jumlah Total Rp 93,472.50
11 Membuat Begisting Plat Lantai / m2
Bahan : An. ( SNI 7394:2008 ) 6.24 ( Revisi 2008 )
Kayu Meranti Begesting (MC) 0.0400 m3 Rp - Rp -
Minyak begisting 0.2000 ltr Rp - Rp -
Perancah kayu (MC) 0.0150 m3 Rp - Rp -
Multiplek 9 mm uk. 2.4 x 1.22 0.3500 lbr Rp - Rp -
Dolken Kayu gelam 3.0000 btg Rp - Rp -
Paku 0.4000 kg Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.0330 hari Rp 175,000.00 Rp 5,775.00
Kepala tukang kayu 0.0330 hari Rp - Rp -
Tukang kayu 0.3300 hari Rp - Rp -
Pekerja 0.6600 hari Rp 120,000.00 Rp 79,200.00
Jumlah Upah Rp 84,975.00
Jumlah Total Bahan Dan Upah Rp 84,975.00
Over Head + Profit 10% Rp 8,497.50
Jumlah Total Rp 93,472.50
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
23 Kp Kolom 12x15 cm / m3
Bahan & Upah :
Beton mutu F'c = 14,5 Mps (K175) 1.0000 m3 Rp 233,777.50 Rp 233,777.50
Pembesian polos 195.6433 kg Rp 1,001.00 Rp 195,838.98
Begisting 16.6667 m2 Rp 73,645.00 Rp 1,227,416.67
Jumlah Total Bahan Dan Upah Rp 1,657,033.14
24 B1 Balok 40x60 cm / m3
Bahan & Upah :
Beton mutu F'c = 21,7 Mps (K250) 1.0000 m3 Rp 233,777.50 Rp 233,777.50
Pembesian polos 58.5083 kg Rp 1,001.00 Rp 58,566.80
Pembesian Ulir 224.6128 kg Rp 1,001.00 Rp 224,837.41
Begisting 6.6667 m2 Rp 93,472.50 Rp 623,150.00
Jumlah Total Bahan Dan Upah Rp 1,140,331.71
25 B2 Balok 30x40 cm / m3
Bahan & Upah :
Beton mutu F'c = 21,7 Mps (K250) 1.0000 m3 Rp 233,777.50 Rp 233,777.50
Pembesian polos 79.2693 kg Rp 1,001.00 Rp 79,348.57
Pembesian Ulir 230.4209 kg Rp 1,001.00 Rp 230,651.28
Begisting 9.1667 m2 Rp 93,472.50 Rp 856,831.25
Jumlah Total Bahan Dan Upah Rp 1,400,608.60
26 B3 Balok 25x35 cm / m3
Bahan & Upah :
Beton mutu F'c = 21,7 Mps (K250) 1.0000 m3 Rp 233,777.50 Rp 233,777.50
Pembesian polos 79.1089 kg Rp 1,001.00 Rp 79,188.04
Pembesian Ulir 188.7717 kg Rp 1,001.00 Rp 188,960.45
Begisting 10.8571 m2 Rp 93,472.50 Rp 1,014,844.29
Jumlah Total Bahan Dan Upah Rp 1,516,770.28
27 B4 Balok 25x35-50 cm / m3
Bahan & Upah :
Beton mutu F'c = 21,7 Mps (K250) 1.0000 m3 Rp 233,777.50 Rp 233,777.50
Pembesian polos 82.5096 kg Rp 1,001.00 Rp 82,592.11
Pembesian Ulir 118.8873 kg Rp 1,001.00 Rp 119,006.15
Begisting 10.3529 m2 Rp 93,472.50 Rp 967,715.29
Jumlah Total Bahan Dan Upah Rp 1,403,091.05
28 B5 Balok 20x30 cm / m3
Bahan & Upah :
Beton mutu F'c = 21,7 Mps (K250) 1.0000 m3 Rp 233,777.50 Rp 233,777.50
Pembesian polos 104.4958 kg Rp 1,001.00 Rp 104,600.33
Pembesian Ulir 184.2133 kg Rp 1,001.00 Rp 184,397.55
Begisting 13.3333 m2 Rp 93,472.50 Rp 1,246,300.00
Jumlah Total Bahan Dan Upah Rp 1,769,075.38
29 B6 Balok 25x40 cm / m3
Bahan & Upah :
Beton mutu F'c = 21,7 Mps (K250) 1.0000 m3 Rp 233,777.50 Rp 233,777.50
Pembesian polos 57.9532 kg Rp 1,001.00 Rp 58,011.14
Pembesian Ulir 173.6869 kg Rp 1,001.00 Rp 173,860.54
Begisting 10.5000 m2 Rp 93,472.50 Rp 981,461.25
Jumlah Total Bahan Dan Upah Rp 1,447,110.43
30 BL1 Balok Latei 12x20 cm / m3
Bahan & Upah :
Beton mutu F'c = 14,5 Mps (K175) 1.0000 m3 Rp 233,777.50 Rp 233,777.50
Pembesian polos 233.7618 kg Rp 1,001.00 Rp 233,995.55
Begisting 21.6667 m2 Rp 73,645.00 Rp 1,595,641.67
Jumlah Total Bahan Dan Upah Rp 2,063,414.71
31 BL2 Balok Leufel 12x20 cm / m3
Bahan & Upah :
Beton mutu F'c = 14,5 Mps (K175) 1.0000 m3 Rp 233,777.50 Rp 233,777.50
Pembesian polos 202.8978 kg Rp 1,001.00 Rp 203,100.73
Begisting 21.6667 m2 Rp 73,645.00 Rp 1,595,641.67
Jumlah Total Bahan Dan Upah Rp 2,032,519.89
32 BD Balok Bordes 25x35 cm / m3
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
PEKERJAAN PLESTERAN
1 Membuat Dan Memasang 1 m3 Kusen Pintu Dan Kusen Jendela, Kayu Kelas I
Bahan : An. ( SNI 3434:2008 ) 6.2 ( Revisi 2008 )
Kayu Klas II (Kamper ) 1.200 m3 Rp - Rp -
Paku 10 cm 1.250 kg Rp - Rp -
Lem kayu 1.000 kg Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.300 hari Rp 175,000.00 Rp 52,500.00
Kepala Tukang kayu 1.800 hari Rp - Rp -
Tukang kayu 18.000 hari Rp - Rp -
Pekerja 6.000 hari Rp 120,000.00 Rp 720,000.00
Jumlah Upah Rp 772,500.00
Jumlah Total Bahan dan Upah Rp 772,500.00
Over Head + Profit 10% Rp 77,250.00
Jumlah Total Rp 849,750.00
2 Membuat Dan Memasang 1 m2 Daun Pintu Panel,, Kayu Kelas I
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Upah :
Mandor 0.002 hari Rp 175,000.00 Rp 367.50
Kepala tukang Almunium 0.004 hari Rp - Rp -
Tukang Alluminium 0.043 hari Rp - Rp -
Pekerja 0.043 hari Rp 120,000.00 Rp 5,160.00
Jumlah Upah Rp 5,527.50
Jumlah Total Bahan Dan Upah Rp 5,527.50
Over Head + Profit 10% Rp 552.75
Jumlah Total Rp 6,080.25
2 Memasang Jendela Kaca Rangka Aluminium/ m2
Bahan : An. ( SNI Edisi 2007 ) 6.11
Selimar jendela aluminium warna brown / black ( ALEXINDO ) 4.400 m' Rp - Rp -
Profil kaca aluminium powder coating 4.500 m' Rp - Rp -
Sealant 0.270 tube Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.005 hari Rp 175,000.00 Rp 875.00
Kepala tukang Almunium 0.009 hari Rp - Rp -
Tukang Alluminium 0.085 hari Rp - Rp -
Pekerja 0.085 hari Rp 120,000.00 Rp 10,200.00
Jumlah Upah Rp 11,075.00
Jumlah Total Bahan Dan Upah Rp 11,075.00
Over Head + Profit 10% Rp 1,107.50
Jumlah Total Rp 12,182.50
3 Memasang Pintu Kaca Rangka Aluminium/ m2
Bahan : An. ( SNI Edisi 2007 ) 6.11
Selimar pintu aluminium warna brown / black ( ALEXINDO ) 4.400 m' Rp - Rp -
Profil kaca aluminium powder coating 4.500 m' Rp - Rp -
Sealant 0.270 tube Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.005 hari Rp 175,000.00 Rp 875.00
Kepala tukang Almunium 0.009 hari Rp - Rp -
Tukang Alluminium 0.085 hari Rp - Rp -
Pekerja 0.085 hari Rp 120,000.00 Rp 10,200.00
Jumlah Upah Rp 11,075.00
Jumlah Total Bahan Dan Upah Rp 11,075.00
Over Head + Profit 10% Rp 1,107.50
Jumlah Total Rp 12,182.50
4 Memasang Pintu type P1 / Unit
Kusen aluminium 4" warna brown / balck ( ALEXINDO ) 5.080 m1 Rp 6,080.25 Rp 30,887.67
Daun Pintu WPC finishing melamin uk. 210 x 72 cm (Terpasang) 1.000 bh Rp - Rp -
Engsel pintu ( DECKSON ) 3.000 bh Rp 1,980.00 Rp 5,940.00
Handle pintu steinless + kunci ( DEKSON ) 1.000 psg Rp 2,124.38 Rp 2,124.38
Jumlah Total Bahan Dan Upah Rp 38,952.05
5 Memasang Pintu type P2 / Unit
Kusen aluminium 4" warna brown / balck ( ALEXINDO ) 5.180 m1 Rp 6,080.25 Rp 31,495.70
Daun Pintu WPC finishing melamin uk. 210 x 82 cm (Terpasang) 1.000 bh Rp - Rp -
Engsel pintu ( DECKSON ) 3.000 bh Rp 1,980.00 Rp 5,940.00
Handle pintu steinless + kunci ( DEKSON ) 1.000 psg Rp 2,124.38 Rp 2,124.38
Jumlah Total Bahan Dan Upah Rp 39,560.07
6 Memasang Pintu type P3 / Unit
Kusen aluminium 4" warna brown / balck ( ALEXINDO ) 4.140 m1 Rp 6,080.25 Rp 25,172.24
Daun Pintu WPC finishing melamin uk. 150 x 52 cm (Terpasang) 2.000 bh Rp - Rp -
Engsel pintu ( DECKSON ) 6.000 bh Rp 1,980.00 Rp 11,880.00
Grendel pintu tanam ( DECKSON ) 1.000 set Rp 2,124.38 Rp 2,124.38
Handle pintu steinless + kunci ( DEKSON ) 1.000 psg Rp 2,124.38 Rp 2,124.38
Jumlah Total Bahan Dan Upah Rp 41,300.99
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
1 Memasang Kunci / bh
Bahan : An. SNI ( Revisi ) 12.6.2.1
Kunci Pintu 1.000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah : An. SNI ( Revisi ) 12.6.2.2
Mandor 0.001 hari Rp 175,000.00 Rp 131.25
Kepala tukang kayu 0.015 hari Rp - Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
PEKERJAAN RALLING
PEKERJAAN INTERIOR
Upah :
Mandor 0.003 hari Rp 175,000.00 Rp 437.50
Tukang interior 0.150 hari Rp - Rp -
Jumlah Upah Rp 437.50
Jumlah Total Bahan dan Upah Rp 437.50
Over Head + Profit 10% Rp 43.75
Jumlah Total Rp 481.25
8 Memasang 1 m2 lapisan HPL warna terang
Bahan : An. HPS
HPL Warna Terang 0.504 lbr Rp - Rp -
MDF 3 mm 0.504 lbr Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.020 hari Rp 175,000.00 Rp 3,500.00
Kepala tukang interior 0.120 hari Rp - Rp -
Tukang interior 0.600 hari Rp - Rp -
Pekerja 0.200 hari Rp 120,000.00 Rp 24,000.00
Jumlah Upah Rp 27,500.00
Jumlah Total Bahan dan Upah Rp 27,500.00
Over Head + Profit 10% Rp 2,750.00
Jumlah Total Rp 30,250.00
9 Memasang 1 m2 lapisan HPL warna gelap
Bahan : An. HPS
HPL Warna Gelap 0.504 lbr Rp - Rp -
MDF 3 mm 0.504 lbr Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.020 hari Rp 175,000.00 Rp 3,500.00
Kepala tukang interior 0.120 hari Rp - Rp -
Tukang interior 0.600 hari Rp - Rp -
Pekerja 0.200 hari Rp 120,000.00 Rp 24,000.00
Jumlah Upah Rp 27,500.00
Jumlah Total Bahan dan Upah Rp 27,500.00
Over Head + Profit 10% Rp 2,750.00
Jumlah Total Rp 30,250.00
10 Memasang Lapisan Dinding Walpaper /m2
Bahan : An. HPS
Wallpaper 0.504 lbr Rp - Rp -
Lem perekat wallpaper 0.500 kg Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.010 hari Rp 175,000.00 Rp 1,750.00
Kepala tukang interior 0.060 hari Rp - Rp -
Tukang interior 0.300 hari Rp - Rp -
Pekerja 0.100 hari Rp 120,000.00 Rp 12,000.00
Jumlah Upah Rp 13,750.00
Jumlah Total Bahan dan Upah Rp 13,750.00
Over Head + Profit 10% Rp 1,375.00
Jumlah Total Rp 15,125.00
11 Memasang Handle Minimalis steinless p. 30 cm/ bh
Bahan : An. SNI ( Revisi ) 12.6.5.1
Handle laci minimalis steinless p. 30 cm 1.0000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah : An. SNI ( Revisi ) 12.6.5.2
Mandor interior 0.0008 hari Rp 175,000.00 Rp 131.25
Kepala tukang interior 0.0150 hari Rp - Rp -
Tukang interior 0.1500 hari Rp - Rp -
Pekerja interior 0.0150 hari Rp 120,000.00 Rp 1,800.00
Jumlah Upah Rp 1,931.25
Jumlah Total Bahan dan Upah Rp 1,931.25
Over Head + Profit 10% Rp 193.13
Jumlah + Over head And Profit Rp 2,124.38
12 Memasang Handle Laci steinless / bh
Bahan : An. SNI ( Revisi ) 12.6.5.1
Handle laci minimalis steinless p. 40 cm 1.0000 bh Rp - Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Jumlah Bahan Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
PEKERJAAN PLAFOND
Pasang penutup plafond gypsumboard T. 9 mm + Rangka hollow galvalume 40.40.0,6 mm termasuk penggantung hollow galvalume
1
20.40.0,6 / m2
Upah :
Mandor 0.003 hari Rp 175,000.00 Rp 525.00
Kepala tukang besi 0.006 hari Rp - Rp -
Tukang besi las Kontruksi 0.060 hari Rp - Rp -
Pekerja 0.060 hari Rp 120,000.00 Rp 7,200.00
Jumlah Upah Rp 7,725.00
Jumlah Total Bahan dan Upah Rp 7,725.00
Over Head + Profit 10% Rp 772.50
Jumlah Total Rp 8,497.50
2 Memasang 1 Kg Profil ( Canal C )
Bahan : An. A.4.2.1.1 (Permen PUPR28 2016)
Besi Baja Canal C 1.150 Kg Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.003 hari Rp 175,000.00 Rp 525.00
Kepala tukang besi 0.006 hari Rp - Rp -
Tukang besi las Kontruksi 0.060 hari Rp - Rp -
Pekerja 0.060 hari Rp 120,000.00 Rp 7,200.00
Jumlah Upah Rp 7,725.00
Jumlah Total Bahan dan Upah Rp 7,725.00
Over Head + Profit 10% Rp 772.50
Jumlah Total Rp 8,497.50
3 Memasang 1 Kg Profil ( Plat )
Bahan : An. A.4.2.1.1 (Permen PUPR28 2016)
Jumlah Bahan Rp -
Upah :
Mandor 0.003 hari Rp 175,000.00 Rp 525.00
6 Pasang Double Kalsiplank L.30 cm tb. 8 mm + rangka hollow galvalume 20.40 mm /m1
Bahan : An. HPS
Papan fiber semen L.30 cm tb. 12 mm motif serat kayu (KALSI) 2.000 m1 Rp - Rp -
Sekrup 12.000 bh Rp - Rp -
Hollow Galvalume 20.40 mm tb. 0,6 mm (KENCANA) 4.000 m1 Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.050 hari Rp 175,000.00 Rp 8,750.00
Kepala Tukang kayu 0.050 hari Rp - Rp -
Tukang kayu 0.065 hari Rp - Rp -
Pekerja 0.065 hari Rp 120,000.00 Rp 7,800.00
Jumlah Upah Rp 16,550.00
Jumlah Total Bahan dan Upah Rp 16,550.00
Over Head + Profit 10% Rp 1,655.00
Jumlah Total Rp 18,205.00
7 Pemasangan Penutup Atap Genteng Keramik Glazur / m2
Bahan : An. SNI A.4.5.2.2
Genteng keramik glazur 12.000 bh Rp - Rp -
Jumlah Bahan Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Upah :
Mandor 0.008 hari Rp 175,000.00 Rp 1,400.00
Kepala Tukang kayu 0.008 hari Rp - Rp -
Tukang kayu 0.075 hari Rp - Rp -
Pekerja 0.150 hari Rp 120,000.00 Rp 18,000.00
Jumlah Upah Rp 19,400.00
Jumlah Total Bahan dan Upah Rp 19,400.00
Over Head + Profit 10% Rp 1,940.00
Jumlah Total Rp 21,340.00
8 Pemasangan Bubungan Genteng Keramik Glazur / m2
Bahan : An. SNI A.4.5.2.5
Bubungan genteng keramik glazur 3.500 bh Rp - Rp -
Portland cement (SEMEN INDONESIA) @ 40 kg 0.800 kg Rp - Rp -
Pasir pasang 0.032 m3 Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.002 hari Rp 175,000.00 Rp 350.00
Kepala Tukang kayu 0.020 hari Rp - Rp -
Tukang kayu 0.200 hari Rp - Rp -
Pekerja 0.400 hari Rp 120,000.00 Rp 48,000.00
Jumlah Upah Rp 48,350.00
Jumlah Total Bahan dan Upah Rp 48,350.00
Over Head + Profit 10% Rp 4,835.00
Jumlah Total Rp 53,185.00
9 Pasang Penutup Atap UPVC / m2
Bahan : An. HPS
Penutup atap UPVC (ALDERON) 1.100 m2 Rp - Rp -
Baut cap roofing atap PVC 4.400 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.140 hari Rp 175,000.00 Rp 24,500.00
Kepala Tukang kayu 0.007 hari Rp - Rp -
Tukang kayu 0.070 hari Rp - Rp -
Pekerja 0.140 hari Rp 120,000.00 Rp 16,800.00
Jumlah Upah Rp 41,300.00
Jumlah Total Bahan dan Upah Rp 41,300.00
Over Head + Profit 10% Rp 4,130.00
Jumlah Total Rp 45,430.00
PEKERJAAN PENGECATAN
1 Mengecat Tembok Baru (1 Lapis Plamir,1 Lapis Cat Dasar, 2 Lapis Cat Penutup)Interior / m2
Bahan : An. SNI ( Revisi ) 14.6.14.1
Plamur tembok 0.100 kg Rp - Rp -
Cat tembok dasar 0.100 kg Rp - Rp -
Cat tembok penutup 0.260 kg Rp - Rp -
Jumlah Bahan Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
PEKERJAAN LISTRIK
1 Pemasangan Head Penangkal Petir non radioaktif radius 60 m Ex. VIKING / unit PENANGKAL PETIR
Bahan : An. HPS
Head Penangkal Petir non radioaktif radius 60 m Ex. VIKING 1.000 unit Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.200 hari Rp 175,000.00 Rp 35,000.00
Kepala tukang listrik 0.500 hari Rp 150,000.00 Rp 75,000.00
Tukang listrik 0.500 hari Rp 140,000.00 Rp 70,000.00
Pekerja 2.000 hari Rp 120,000.00 Rp 240,000.00
Jumlah Upah Rp 420,000.00
Jumlah Total Bahan dan Upah Rp 420,000.00
Over Head + Profit 10% Rp 42,000.00
Jumlah Total Rp 462,000.00
2 Pemasangan Down Conductor NYY 1 x 70 mm / unit
Bahan : An. HPS
Kabel NYY 1 x 70 mm 1.000 m1 Rp - Rp -
Pipa PVC type aw Ø 3/4" 2.000 m1 Rp - Rp -
Klem dan material bantu 5.000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.017 hari Rp 175,000.00 Rp 2,975.00
Kepala tukang listrik 0.033 hari Rp 150,000.00 Rp 4,950.00
Tukang listrik 0.166 hari Rp 140,000.00 Rp 23,240.00
Pekerja 0.166 hari Rp 120,000.00 Rp 19,920.00
Jumlah Upah Rp 51,085.00
Jumlah Total Bahan dan Upah Rp 51,085.00
Over Head + Profit 10% Rp 5,108.50
Jumlah Total Rp 56,193.50
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
PEKERJAAN PERSIAPAN
PEKERJAAN PASANGAN
Upah :
Mandor 0.0150 hari Rp - Rp -
Kepala tukang batu 0.0100 hari Rp - Rp -
Tukang batu 0.1000 hari Rp - Rp -
Pekerja 0.3000 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan Dan Upah / m3 Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Begisting 18.3333 m2 Rp - Rp -
Jumlah Total Bahan Dan Upah Rp -
18 Balok Level 15x25 cm / m3
Bahan & Upah :
Beton mutu F'c = 14,5 Mps (K175) 1.0000 m3 Rp - Rp -
Pembesian polos 150.4918 kg Rp - Rp -
Begisting 17.3333 m2 Rp - Rp -
Jumlah Total Bahan Dan Upah Rp -
18 RB1 Ring Balk 15x20 cm / m3
Bahan & Upah :
Beton mutu F'c = 14,5 Mps (K175) 1.0000 m3 Rp - Rp -
Pembesian polos 177.4448 kg Rp - Rp -
Begisting 13.3333 m2 Rp - Rp -
Jumlah Total Bahan Dan Upah Rp -
19 Plat lantai beton tb. 12 cm / m3
Bahan & Upah :
Beton mutu F'c = 21,7 Mps (K250) 1.0000 m3 Rp - Rp -
Pembesian polos 146.6595 kg Rp - Rp -
Begisting 8.3333 m2 Rp - Rp -
Jumlah Total Bahan Dan Upah Rp -
20 Plat tangga beton tb. 15 cm / m3
Bahan & Upah :
Beton mutu F'c = 14,5 Mps (K175) 1.0000 m3 Rp - Rp -
Pembesian Ulir 357.3049 kg Rp - Rp -
Begisting 6.6667 m2 Rp - Rp -
Jumlah Total Bahan Dan Upah Rp -
21 Anak tangga beton / m3
Bahan & Upah :
Beton mutu F'c = 14,5 Mps (K175) 1.0000 m3 Rp - Rp -
Pembesian polos 119.9945 kg Rp - Rp -
Begisting 6.6667 m2 Rp - Rp -
Jumlah Total Bahan Dan Upah Rp -
22 Plat level beton tb. 8 cm / m3
Bahan & Upah :
Beton mutu F'c = 21,7 Mps (K250) 1.0000 m3 Rp - Rp -
Pembesian polos 62.5397 kg Rp - Rp -
Begisting 12.5000 m2 Rp - Rp -
Jumlah Total Bahan Dan Upah Rp -
PEKERJAAN PLESTERAN
Upah :
Tukang Batu 0.1200 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.0350 hari Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.0350 hari Rp - Rp -
1 Membuat Dan Memasang 1 m3 Kusen Pintu Dan Kusen Jendela, Kayu Kelas I
Bahan : An. ( SNI 3434:2008 ) 6.2 ( Revisi 2008 )
Kayu Klas I (Jati ) 1.200 m3 Rp - Rp -
Paku 10 cm 1.250 kg Rp - Rp -
Lem kayu 1.000 kg Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.300 hari Rp - Rp -
Kepala Tukang kayu 1.800 hari Rp - Rp -
Tukang kayu 18.000 hari Rp - Rp -
Pekerja 6.000 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
1 Memasang Kusen Alluminium/ m1
Bahan : An. ( SNI Edisi 2007 ) 6.11
Kusen aluminium 4" warna brown / balck ( ALEXINDO ) 1.100 m' Rp - Rp -
Sekrup 2.000 bh Rp - Rp -
Sealant 0.060 tube Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.002 hari Rp - Rp -
Kepala tukang Almunium 0.004 hari Rp - Rp -
Tukang Alluminium 0.043 hari Rp - Rp -
Pekerja 0.043 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan Dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
2 Memasang Jendela Kaca Rangka Aluminium/ m2
Bahan : An. ( SNI Edisi 2007 ) 6.11
Selimar jendela aluminium warna brown / black ( ALEXINDO ) 4.400 m' Rp - Rp -
Profil kaca aluminium powder coating 4.500 m' Rp - Rp -
Sealant 0.270 tube Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.005 hari Rp - Rp -
Kepala tukang Almunium 0.009 hari Rp - Rp -
Tukang Alluminium 0.085 hari Rp - Rp -
Pekerja 0.085 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan Dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
3 Memasang Pintu Kaca Rangka Aluminium/ m2
Bahan : An. ( SNI Edisi 2007 ) 6.11
Selimar pintu aluminium warna brown / black ( ALEXINDO ) 4.400 m' Rp - Rp -
Profil kaca aluminium powder coating 4.500 m' Rp - Rp -
Sealant 0.270 tube Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.005 hari Rp - Rp -
Kepala tukang Almunium 0.009 hari Rp - Rp -
Tukang Alluminium 0.085 hari Rp - Rp -
Pekerja 0.085 hari Rp - Rp -
Jumlah Upah Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
1 Memasang Kunci / bh
Bahan : An. SNI ( Revisi ) 12.6.2.1
Kunci Pintu 1.000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah : An. SNI ( Revisi ) 12.6.2.2
Mandor 0.001 hari Rp - Rp -
Kepala tukang kayu 0.015 hari Rp - Rp -
Tukang kayu 0.150 hari Rp - Rp -
Pekerja 0.015 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
2 Memasang Engsel Jendela / bh
Bahan : An. SNI ( Revisi ) 12.6.6.1
Engsel jendela 1.000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah : An. SNI ( Revisi ) 12.6.6.2
Mandor 0.001 hari Rp - Rp -
Kepala tukang kayu 0.015 hari Rp - Rp -
Tukang kayu 0.150 hari Rp - Rp -
Pekerja 0.015 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
3 Memasang Casement / bh
Bahan : An. SNI ( Revisi ) 12.6.6.1
Casement 1.000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah : An. SNI ( Revisi ) 12.6.6.2
Mandor 0.001 hari Rp - Rp -
Kepala tukang kayu 0.015 hari Rp - Rp -
Tukang kayu 0.150 hari Rp - Rp -
Pekerja 0.015 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
4 Memasang Engsel Pintu / bh
Bahan : An. SNI ( Revisi ) 12.6.6.1
Engsel Pintu 1.000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah : An. SNI ( Revisi ) 12.6.6.2
Mandor 0.001 hari Rp - Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
PEKERJAAN INTERIOR
Upah :
Mandor 0.020 hari Rp - Rp -
Kepala tukang interior 0.120 hari Rp - Rp -
Tukang interior 0.600 hari Rp - Rp -
Pekerja 0.200 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
9 Memasang 1 m2 lapisan HPL warna gelap
Bahan : An. HPS
HPL Warna Gelap 0.504 lbr Rp - Rp -
MDF 3 mm 0.504 lbr Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.020 hari Rp - Rp -
Kepala tukang interior 0.120 hari Rp - Rp -
Tukang interior 0.600 hari Rp - Rp -
Pekerja 0.200 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
10 Memasang Lapisan Dinding Walpaper /m2
Bahan : An. HPS
Wallpaper 0.504 lbr Rp - Rp -
Lem perekat wallpaper 0.500 kg Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.010 hari Rp - Rp -
Kepala tukang interior 0.060 hari Rp - Rp -
Tukang interior 0.300 hari Rp - Rp -
Pekerja 0.100 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
11 Memasang Wallboard PVC /m2
Bahan : An. HPS
Wallboard type modified V-Shape L. 400 mm, tb. 9 mm, P. 300 c 1.050 m2 Rp - Rp -
Sekrup 4.000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.010 hari Rp - Rp -
Kepala tukang interior 0.060 hari Rp - Rp -
Tukang interior 0.200 hari Rp - Rp -
Pekerja 0.100 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Wallboard type modified V-Shape L. 400 mm, tb. 9 mm, P. 300 cm Merk
m2 Rp - Rp -
SHUNDA
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Pasang penutup plafond gypsumboard T. 9 mm + Rangka hollow galvalume 40.40.0,6 mm termasuk penggantung hollow galvalume
1
20.40.0,6 / m2
Bahan : An. HPS
Rangka hollow galvalume 40.40.0,6 mm 3.600 m1 Rp - Rp -
Penggantung hollow galvalume 20.40.0,6 mm 2.000 m1 Rp - Rp -
Ramset 8.000 bh Rp - Rp -
Gypsumboard tb. 9 mm 0.364 lbr Rp - Rp -
Paku sekrup 5.000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.025 hari Rp - Rp -
Kepala tukang kayu 0.050 hari Rp - Rp -
Tukang kayu 0.100 hari Rp - Rp -
Pekerja 0.100 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Harga Satuan Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
Pasang penutup plafond PVC ( SHUNDA ) + Rangka hollow galvalume 40.40.0,6 mm termasuk penggantung hollow galvalume 20.40.0,6 /
2
m2
Bahan : An. HPS
Rangka hollow galvalume 40.40.0,6 mm 3.600 m1 Rp - Rp -
Penggantung hollow galvalume 20.40.0,6 mm 2.000 m1 Rp - Rp -
Ramset 8.000 bh Rp - Rp -
Plafond PVC 1.050 m2 Rp - Rp -
Paku sekrup 5.000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.025 hari Rp - Rp -
Kepala tukang kayu 0.050 hari Rp - Rp -
Tukang kayu 0.100 hari Rp - Rp -
Pekerja 0.100 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Harga Satuan Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
PEKERJAAN PENGECATAN
1 Mengecat Tembok Baru (1 Lapis Plamir,1 Lapis Cat Dasar, 2 Lapis Cat Penutup)Interior / m 2
Bahan : An. SNI ( Revisi ) 14.6.14.1
Plamur tembok 0.100 kg Rp - Rp -
Cat tembok dasar 0.100 kg Rp - Rp -
Cat tembok penutup 0.260 kg Rp - Rp -
Jumlah Bahan Rp -
Upah : An. SNI ( Revisi ) 14.6.14.2
Mandor 0.003 hari Rp - Rp -
Kepala tukang cat 0.006 hari Rp - Rp -
Tukang cat 0.063 hari Rp - Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
2 Pekerjaan cat tembok baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup)Exterior / m2
Bahan : An. SNI ( Revisi ) 14.6.14.1
Alkali Sealer 0.100 kg Rp - Rp -
cat tembok dasar 0.100 kg Rp - Rp -
cat tembok penutup 0.260 kg Rp - Rp -
alat bantu 1.000 ls Rp - Rp -
Jumlah Bahan Rp -
Upah : An. SNI ( Revisi ) 14.6.14.2
Mandor 0.003 hari Rp - Rp -
KepalaTukang cat 0.006 hari Rp - Rp -
Tukang cat 0.063 hari Rp - Rp -
Pekerja 0.020 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Harga Satuan -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
3 Mengecat Bidang Besi Baru (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) / m 2
Upah :
Mandor 0.003 hari Rp - Rp -
KepalaTukang cat 0.006 hari Rp - Rp -
Tukang cat 0.075 hari Rp - Rp -
Pekerja 0.050 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
6 Pelapisan Dengan Coating Batu Alam / m2
Bahan : An. HPS
Coating batu alam 0.100 kg Rp - Rp -
Kuas / roll 0.010 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.0025 hari Rp - Rp -
KepalaTukang cat 0.020 hari Rp - Rp -
Tukang cat 0.200 hari Rp - Rp -
Pekerja 0.020 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
7 Pengecatan Permukaan Baja Dengan Meni Besi / m2
Bahan : An. A.4.7.1.16 (Permen PUPR28 2016)
Meni 0.100 kg Rp - Rp -
Kuas / roll 0.010 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.0025 hari Rp - Rp -
KepalaTukang cat 0.020 hari Rp - Rp -
Tukang cat 0.200 hari Rp - Rp -
Pekerja 0.020 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
8 Pelapisan Dengan Melamin doof / m2
Bahan : An. HPS
Wood filler (IMPRA) 0.200 kg Rp - Rp -
Pewarna (IMPRA) 0.050 kg Rp - Rp -
Shanding (IMPRA) 0.500 kg Rp - Rp -
Clear doof (IMPRA) 0.200 kg Rp - Rp -
Coumpond 0.200 kg Rp - Rp -
Thiner A 0.850 ltr Rp - Rp -
Kertas gosok kayu 2.000 bh Rp - Rp -
Alat Bantu 1.000 ls Rp - Rp -
Jumlah Bahan Rp -
Upah :
Mandor 0.003 Hari Rp - Rp -
Kepala Tukang Cat 0.008 Hari Rp - Rp -
Tukan Cat 0.500 Hari Rp - Rp -
Pekerja 0.020 Hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Jumlah Total Rp -
PEKERJAAN LISTRIK
Jumlah Bahan Rp -
Upah :
Kepala tukang listrik 0.0500 hari Rp - Rp -
Tukang listrik 0.5000 hari Rp - Rp -
Pekerja 0.3000 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
2 Pemasangan Titik Stop Kontak / Titik
Bahan : An. 24.07.02.01 ( HSPK Surabaya 2016 )
Kabel NYM 3 x 2.5 mm ( SUPREME ) 10.0000 m' Rp - Rp -
Stop Kontak 1.0000 bh Rp - Rp -
Pipa paralon 5/8 2.5000 btg Rp - Rp -
T Doos Pvc 6.0000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Kepala Tukang Listrik 0.0500 hari Rp - Rp -
Tukang Listrik 0.2000 hari Rp - Rp -
Pekerja 0.0010 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Jumlah Bahan Rp -
Upah :
Kepala Tukang Listrik 0.0500 hari Rp - Rp -
Tukang Listrik 0.2000 hari Rp - Rp -
Pekerja 0.0010 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
4 Pemasangan Saklar Tunggal / Buah
Bahan : An. 24.07.02.03 ( HSPK Surabaya 2016 )
Saklar Tunggal 1.0000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Kepala Tukang Listrik 0.0500 hari Rp - Rp -
Tukang Listrik 0.2000 hari Rp - Rp -
Pekerja 0.0010 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
5 Pemasangan Saklar Ganda / Buah
Bahan : An. 24.07.02.04 ( HSPK Surabaya 2016 )
Saklar Ganda 1.0000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Kepala Tukang Listrik 0.0500 hari Rp - Rp -
Tukang Listrik 0.2000 hari Rp - Rp -
Pekerja 0.0010 hari Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
6 Pas. Lampu Downlight 4" with Lamp LED 18 watt / bh
Jumlah Bahan Rp -
Upah :
Upah pasang 1.0000 ls Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
7 Pas. Lampu Downlight 4" with Lamp LED 3 watt / bh
Jumlah Bahan Rp -
NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH
Upah :
Upah pasang 1.0000 ls Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
8 Pas. Lampu Halogen/ Spot LED 5 watt / bh
Jumlah Bahan Rp -
Upah :
Upah pasang 1.0000 ls Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
9 Pas. Lampu LED strip / m1
Jumlah Bahan Rp -
Upah :
Upah pasang 1.0000 ls Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Bahan dan Upah Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
9 Lampu Gantung Lowbay LED 40 watt
Bahan : An. HPS
Lampu Gantung Lowbay LED 40 Watt ( PHILIPS ) 1.0000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Upah pasang 1.0000 ls Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Harga Satuan Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
7 Lampu tempel kolom ( klasik )
Bahan : An. HPS
Lampu tempel kolom ( klasik ) 1.0000 bh Rp - Rp -
Jumlah Bahan Rp -
Upah :
Upah pasang 1.0000 ls Rp - Rp -
Jumlah Upah Rp -
Jumlah Total Harga Satuan Rp -
Over Head + Profit 10% Rp -
Jumlah Total Rp -
DAFTAR KUANTITAS DAN ESTIMATE ENGINEERING ( EE )
1 2 3 4 5
JUMLAH Rp 2,604,655.54
III PEKERJAAN INTERIOR RUANG RAPAT
JUMLAH Rp -
IV PEKERJAAN PLAFOND DAN PARTISI
1 2 3 4 5
JUMLAH Rp -
V PEKERJAAN PENGECATAN
1 Pengecatan Plafond 158.24 m2 Rp - Rp -
2 Pengecatan dinding partisi 18.02 m2 Rp - Rp -
JUMLAH Rp -
VI PEKERJAAN INSTALASI LISTRIK
1 Pek. pasang instalasi titik dan stop kontak ( PANASONIC) 16.00 titik Rp - Rp -
2 Pek. pasang instalasi listrik dan titik lampu 71.00 titik Rp - Rp -
3 Pek. pasang saklar ganda ( PANASONIC ) 7.00 bh Rp - Rp -
4 Pek. pasang lampu Downlight 4" with lamp LED 15 watt PHILIPS 57.00 bh Rp - Rp -
5 Pek. pasang lampu tempel Kolom ( Klasik ) 14.00 bh Rp - Rp -
JUMLAH Rp -
VII PEKERJAAN SANITAIR DAN RIOLLERING
1 Pek. pasang pipa instalasi air bersih Ø 3/4" Aw 6.00 m1 Rp - Rp -
2 Pek. pasang pipa instalasi air bersih Ø 1" Aw 13.53 m1 Rp - Rp -
3 Pek. pasang pipa instalasi air bersih Ø 1 1/2" Aw 36.25 m1 Rp - Rp -
4 Pek. pasang pipa instalasi air kotor Ø 3" Aw 15.66 m1 Rp - Rp -
5 Pek. pasang pipa instalasi air kotor Ø 4" Aw 20.15 m1 Rp - Rp -
Pek. Pasang Bioseptictank 1m3 termasuk casing dinding bata
6 1.00 unit Rp - Rp -
( sesuai gambar )
JUMLAH Rp -
B.) PEKERJAAN GEDUNG LANTAI 2
I PEKERJAAN PERSIAPAN
1 Bongkar Dinding Bata 8.41 m3 Rp - Rp -
2 Bongkar Dinding Partisi 19.00 m2 Rp - Rp -
3 Bongkar Keramik lantai 329.45 m2 Rp - Rp -
4 Bongkar Kusen Dan daun Pintu 14.00 bh Rp - Rp -
5 Bongkar Plafond lama termasuk rangka 282.76 m2 Rp - Rp -
6 Buang Bekas Bongkaran keluar lokasi kegiatan 1.00 ls Rp - Rp -
JUMLAH Rp -
II PEKERJAAN PASANGAN
1 Pas. bata merah tebal 1/2 bata, campuran 1Pc : 5Ps 131.28 m2 Rp - Rp -
JUMLAH Rp -
III PEKERJAAN BETON
1 Kolom Praktis 12x12 cm 0.43 m3 Rp - Rp -
2 Ring balk 15x20 cm 2.67 m3 Rp - Rp -
3 Balok Level 15x25 cm 0.35 m3 Rp - Rp -
4 Plat Level t. 8 cm 0.37 m3 Rp - Rp -
JUMLAH Rp -
IV PEKERJAAN PLESTERAN
1 Plesteran bata 1Pc : 5Ps 262.56 m2 Rp - Rp -
2 Acian Beton ekspose 133.45 m2 Rp - Rp -
3 Benangan sudut 54.40 m1 Rp - Rp -
JUMLAH Rp -
V PEKERJAAN LANTAI DAN PELAPIS DINDING
1 Pas. Granite lantai 60x60 cm ( polished ) VENUS 298.36 m2 Rp - Rp -
2 Pas. Granite Lantai 60x60 cm ( Unpolished ) VENUS 32.20 m2 Rp - Rp -
3 Pas. Granite dinding 60x60 cm ( polished ) VENUS 172.02 m2 Rp - Rp -
4 Pas. Marmer Alam Lokal ( Warna gelap ) 57.50 m2 Rp - Rp -
5 Pas. Step noising granite 10x60 cm 135.47 m1 Rp - Rp -
6 Pas. Lantai vinnyl wood floor tb. 2 mm 38.44 m2 Rp - Rp -
7 Pas. pasang rumput sintetis swiss t. 30 mm 41.20 m2 Rp - Rp -
No. JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
8 Pas. Batu alam Andesit bakar 12.17 m2 Rp - Rp -
9 Penanaman tumbuhan asoka ± 70 cm 15.00 btg Rp - Rp -
10 Penanaman tumbuhan palm kuning ± 60 cm 2.00 btg Rp - Rp -
JUMLAH Rp -
No. JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
VI PEKERJAAN KUSEN, DAUN PINTU, DAN JENDELA
1 Pas. pintu type P1 terdiri dari : kusen aluminium 4" powder coating,
daun pintu slimar aluminium, engsel pintu steinless, handle pintu,
kunci slinder, kaca bening 5 mm finish stiker sandblast 7.00 unit Rp - Rp -
2 Pas. pintu type P2 terdiri dari : kusen Kayu eksisting, daun pintu Panil
Kayu jati, engsel pintu steinless, handle pintu, kunci slinder, kaca
Buram 5 mm finishing melamin 2.00 unit Rp - Rp -
3 Pintu type P3 Melamin Kusen Dan Daun Pintu eksisting 10.00 unit Rp - Rp -
4 Pas. pintu type P4 terdiri dari : kusen aluminium 4" powder coating,
daun pntu slimar aluminium, engsel pintu steinless, handle pintu,
1.00 unit Rp - Rp -
kunci slinder, kaca bening 5 mm
5 Pas. pintu type P5 terdiri dari : kusen Kayu jati 6/12 cm, daun pintu
panil kayu jati , handle pintu, engsel, kunci silinder, Grendel tanam 1.00 unit Rp - Rp -
dan door closer, finishing melamin
6 Pas. pintu type P6 terdiri dari : kusen aluminium 4" powder coating,
daun pintu slimar aluminium, engsel pintu steinless, handle pintu,
kunci slinder, kaca bening 5 mm finish stiker sandblast 2.00 unit Rp - Rp -
7 Pas. pintu type P7 terdiri dari : kusen aluminium 4" powder coating,
daun pintu slimar aluminium, engsel pintu steinless, handle pintu,
kunci slinder, kaca bening 5 mm 1.00 unit Rp - Rp -
8 Pas. pintu type P8 terdiri dari : kusen Kayu jati 6/12 cm, daun pintu
panil kayu jati , handle pintu, engsel, kunci silinder, Grendel tanam 2.00 unit Rp - Rp -
dan door closer, finishing melamin
JUMLAH Rp -
VIII PEKERJAAN INTERIOR RUANG WAKIL KETUA
No. JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
JUMLAH Rp -
IX PEKERJAAN INTERIOR RUANG COMMAND CENTER
1 2 3 4 5
JUMLAH Rp -
X PEKERJAAN INTERIOR AREA KORIDOR DAN TANGGA
JUMLAH Rp -
XI PEKERJAAN PLAFOND DAN PARTISI
JUMLAH Rp -
XII PEKERJAAN PENGECATAN
1 Pengecatan Plafond 282.76 m2 Rp - Rp -
JUMLAH Rp -
XIII PEKERJAAN INSTALASI LISTRIK
1 Pek. pasang instalasi listrik dan titik stop kontak 11.00 titik Rp - Rp -
2 Pek. pasang instalasi listrik dan titik lampu 113.00 titik Rp - Rp -
3 Pek. pasang saklar tunggal 3.00 bh Rp - Rp -
4 Pek. pasang saklar ganda 24.00 bh Rp - Rp -
5 Pek. Lampu Downlight 4" with lamp LED 15 watt PHILIPS 77.00 bh Rp - Rp -
6 Pek. Lampu Downlight 4" with lamp LED 3 watt PHILIPS 12.00 bh Rp - Rp -
7 Pek. Lampu Halogen / Spot LED 5 watt PHILIPS 16.00 bh Rp - Rp -
Pas. Lampu Gantung Lowbay LED 40 watt type BY088P( PHILIPS ) 4.00 bh Rp - Rp -
8
9 Pek. Lampu LED Strip PHILIPS 102.90 m1 Rp - Rp -
10 Pek. pasang Celing exhaust Fan 10" KDK 2.00 bh Rp - Rp -
JUMLAH Rp -
XIV PEKERJAAN SANITAIR DAN RIOLLERING
1 Pek. pasang pipa instalasi air bersih Ø 3/4" Aw 6.00 m1 Rp - Rp -
2 Pas. pipa air panas instalasi air bersih Pprn 25 mm ( Pn 20 ) 9.00 m1 Rp - Rp -
3 Pek. pasang pipa instalasi air bersih Ø 1" Aw 25.30 m1 Rp - Rp -
4 Pek. pasang pipa instalasi air kotor Ø 3" Aw 42.05 m1 Rp - Rp -
5 Pek. pasang pipa instalasi air kotor Ø 4" Aw 38.05 m1 Rp - Rp -
No. JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
Pek. pasang closed duduk mono blok lengkap dengan aksesoris
6 2.00 bh Rp - Rp -
terpasang (TOTO) CW702J / SW784JP
1 2 3 4 5
1 2 3 4 5
10 Pek. kolom 40x60 cm (K1) 31.74 m3 Rp 1,179,277.85 Rp 37,430,278.85
No. JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
11 Pek. kolom 40x40 cm (K2) 9.20 m3 Rp 1,344,845.00 Rp 12,372,574.02
12 Pek. kolom praktis 12x15 cm (Kp) 1.56 m3 Rp 1,657,033.14 Rp 2,587,457.25
13 Pek. balok latei 12x20 cm (BL1) 0.49 m3 Rp 2,063,414.71 Rp 1,015,200.04
14 Pek. balok leufel 12x20 cm (BL2) 0.11 m3 Rp 2,032,519.89 Rp 221,951.17
15 Pek. ring balk 12x20 cm (RB1) 1.29 m3 Rp 1,664,294.89 Rp 2,140,948.95
16 Pek. plat leufel tb.10 cm 0.14 m3 Rp 1,218,446.36 Rp 166,317.93
17 Pek. plat beton meja wastafel tb. 8 cm 0.07 m3 Rp 1,218,446.36 Rp 85,534.93
18 Pek. pondasi tangga 2.18 m3 Rp 612,865.09 Rp 1,334,820.18
19 Pek. plat tangga beton tb. 15 cm 1.87 m3 Rp 1,214,589.75 Rp 2,276,444.84
20 Pek. anak tangga beton 0.67 m3 Rp 977,042.01 Rp 654,007.50
JUMLAH Rp 187,115,696.93
VI PEKERJAAN PLESTERAN
1 Pek. plesteran bata 1Pc : 5Ps 740.97 m2 Rp 57,035.00 Rp 42,261,178.32
2 Pek. acian 989.81 m2 Rp 28,325.00 Rp 28,036,345.59
3 Pek. benangan sudut 386.03 m1 Rp - Rp -
JUMLAH Rp 70,297,523.91
VII PEKERJAAN LANTAI DAN PELAPIS DINDING
1 Pek. pasang granite tile 60x60 cm ( polished ) 368.06 m2 Rp 52,937.50 Rp 19,484,345.65
2 Pek. pasang keramik lantai 30x30 cm (tekstur kasar motif) 17.90 m2 Rp 52,937.50 Rp 947,634.19
3 Pek. pasang keramik dinding 30x60 cm 98.57 m2 Rp 52,937.50 Rp 5,218,261.13
4 Pek. pasang plint granit 10x60 cm 195.86 m1 Rp 11,357.50 Rp 2,224,454.96
5 Pek. pasang penutup kolom / GRC beton 149.58 m2 Rp - Rp -
JUMLAH Rp 27,874,695.93
VIII PEKERJAAN KUSEN, DAUN PINTU, DAN JENDELA
Pek. pasang pintu type P2 terdiri dari : kusen aluminium 4" powder
1 coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, engsel 5.00 unit Rp 39,560.07 Rp 197,800.35
pintu steinless, handle pintu, kunci slinder, kaca bening tb. 5 mm.
Pek. pasang pintu type P3 terdiri dari : kusen aluminium 4" powder
2 coating, daun pintu wpc uk. 150 x 52 cm finishing melamin, engsel 2.00 unit Rp 41,300.99 Rp 82,601.97
pintu steinless, grendel pintu tanam, handle pintu, kunci slinder.
Pek. pasang pintu type P4 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, daun
3 pintu wpc uk. 210 x 42 cm finishing melamin, engsel pintu 1.00 unit Rp 54,305.30 Rp 54,305.30
steinless, grendel pintu tanam, pull handle pintu, kunci slinder, kaca
bening tb. 5 mm.
Pek. pasang pintu type P6 terdiri dari : kusen kayu jati 8/15 cm,
daun pintu panil + jalusi papan kayu jati, rel atas bawah, engsel
4 1.00 unit Rp 1,971,296.40 Rp 1,971,296.40
roda atas bawah, engsel pintu atas tengah bawah, double pull
handle, kunci pintu, grendel pintu atas bawah, finishing melamin.
JUMLAH Rp -
X PEKERJAAN PLAFOND
1 2 3 4 5
XI PEKERJAAN PENGECATAN
1 Pek. cat dinding interior 891.24 m2 Rp 3,121.25 Rp 2,781,767.87
2 Pek. cat plafond 376.69 m2 Rp 3,121.25 Rp 1,175,733.67
3 Pek. cat list gypsum 26.07 m2 Rp 3,121.25 Rp 81,375.76
JUMLAH Rp 4,038,877.31
XII PEKERJAAN INSTALASI LISTRIK
1 Pek. pasang box panel listrik 1.00 unit Rp - Rp -
2 Pek. pasang instalasi listrik dan titik stop kontak 6.00 titik Rp 339,729.50 Rp 2,038,377.00
3 Pek. pasang instalasi listrik dan titik lampu 39.00 titik Rp 405,892.30 Rp 15,829,799.70
4 Pek. pasang saklar tunggal 2.00 bh Rp 74,948.50 Rp 149,897.00
5 Pek. pasang saklar ganda 5.00 bh Rp 97,471.00 Rp 487,355.00
6 Pek. pasang lampu RMI 1x38 watt + armatur RMI full mirror 27.00 bh Rp 243,414.60 Rp 6,572,194.20
7 Pek. pasang lampu SL 18 watt ex. Tornado 11.00 bh Rp 54,340.00 Rp 597,740.00
8 Pek. pasang lampu gantung 25 watt 1.00 bh Rp 48,620.00 Rp 48,620.00
JUMLAH Rp 25,723,982.90
XIII PEKERJAAN PENGADAAN DAN PEMASANGAN LIFT
A.) PEKERJAAN GALIAN DAN URUGAN
1 Pek. bor strous Ø 40 cm ( H= 6 meter ) 48.00 m1 Rp 63,360.00 Rp 3,041,280.00
2 Pek. galian tanah pondasi 21.00 m3 Rp 103,812.50 Rp 2,180,062.50
3 Pek. urug pasir bawah pondasi tb. 10 cm 2.10 m3 Rp 41,525.00 Rp 87,202.50
JUMLAH Rp 5,308,545.00
B.) PEKERJAAN PASANGAN
1 Pek. pasang bata merah tebal 1/2 bata, campuran 1Pc : 5Ps 180.42 m2 Rp 42,487.50 Rp 7,665,386.56
2 Pek. pasang bata merah tebal 1 bata, campuran 1Pc : 5Ps 133.00 m2 Rp 84,975.00 Rp 11,301,675.00
JUMLAH Rp 18,967,061.56
C.) PEKERJAAN BETON
1 Pek. lantai kerja tb. 5 cm 1.05 m3 Rp 233,200.00 Rp 244,860.00
2 Pek. strous Ø 40 cm 6.03 m3 Rp 330,022.82 Rp 1,989,641.55
3 Pek. pondasi poer 580 x 330 x 60 cm type P5 11.48 m3 Rp 516,215.37 Rp 5,928,217.28
4 Pek. sloof 30x50 cm (SL1) 3.23 m3 Rp 925,614.01 Rp 2,985,105.19
5 Pek. kolom 40x40 cm (K2) 6.53 m3 Rp 1,344,845.00 Rp 8,779,148.17
6 Pek. kolom 40x60 cm (K3) 4.90 m3 Rp 1,144,627.16 Rp 5,604,094.58
7 Pek. kolom 25x25 cm (K4) 1.50 m3 Rp 1,906,730.57 Rp 2,860,095.86
8 Pek. balok 25x35 cm (B3) 1.89 m3 Rp 1,516,770.28 Rp 2,861,387.12
9 Pek. balok 25x35-50 cm (B4) 1.70 m3 Rp 1,403,091.05 Rp 2,380,782.44
10 Pek. balok 20x30 cm (B5) 1.77 m3 Rp 1,769,075.38 Rp 3,136,570.65
11 Pek. balok baja WF 200.100.5,5.8 (W) 695.23 kg Rp 8,497.50 Rp 5,907,733.92
12 Pek. balok baja H beem 200.200.8.12 (W2) 342.31 kg Rp 8,497.50 Rp 2,908,813.22
13 Pek. balok baja WF 250.125.6,9 (W3) 378.88 kg Rp 8,497.50 Rp 3,219,532.80
14 Pek. balok baja WF 300.150.6,5.9 (W4) 286.26 kg Rp 8,497.50 Rp 2,432,494.35
15 Pek. plat atap beton tb.12 cm elv. + 17.55 4.62 m3 Rp 1,159,521.13 Rp 5,358,921.68
16 Pek. plat atap beton tb.12 cm elv. + 20.50 3.60 m3 Rp 1,159,521.13 Rp 4,174,276.05
17 Pek. plat dinding beton tb. 20 cm 4.73 m3 Rp 920,578.85 Rp 4,356,179.13
JUMLAH Rp 65,127,853.99
D.) PEKERJAAN PLESTERAN
1 Pek. plesteran bata 1Pc : 5Ps 626.83 m2 Rp 57,035.00 Rp 35,751,260.46
2 Pek. acian 906.68 m2 Rp 28,325.00 Rp 25,681,756.32
3 Pek. benangan sudut 347.56 m1 Rp - Rp -
JUMLAH Rp 61,433,016.78
E.) PEKERJAAN PELAPIS DINDING
1 Pek. pasang marmer warna abu-abu 32.20 m2 Rp 99,137.50 Rp 3,192,227.50
2 Pek. pasang granit tile 60x60 cm warna abu-abu 45.12 m2 Rp 52,937.50 Rp 2,388,540.00
JUMLAH Rp 5,580,767.50
F.) PEKERJAAN LIFT
1 Pek. Lift pasengger Kaps. 1000 Kg, (Lengkap & Terpasang) 2.00 unit Rp - Rp -
JUMLAH Rp -
G.) PEKERJAAN PENGECATAN
1 Pek. cat dinding interior 1,533.51 m2 Rp 3,121.25 Rp 4,786,473.71
2 Pek. waterproofing 121.57 m2 Rp 7,081.25 Rp 860,895.18
3 Pek. meni besi 94.28 m2 Rp 3,121.25 Rp 294,280.81
JUMLAH Rp 5,941,649.70
No. JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
XIV PEKERJAAN SANITAIR DAN RIOLLERING
1 Pek. pasang pipa instalasi air bersih Ø 3/4" Aw 59.05 m1 Rp 33,669.90 Rp 1,988,207.60
2 Pek. pasang pipa instalasi air bersih Ø 1" Aw 69.82 m1 Rp 40,167.16 Rp 2,804,290.36
3 Pek. pasang pipa instalasi air kotor Ø 3" Aw 35.43 m1 Rp 110,697.62 Rp 3,922,016.68
4 Pek. pasang pipa instalasi air kotor Ø 4" Aw 149.67 m1 Rp 164,378.94 Rp 24,602,415.13
5 Pek. pasang pipa instalasi air hujan Ø 5" D 43.60 m1 Rp 145,580.16 Rp 6,347,294.98
6 Pek. pasang wastafel lengkap dengan aksesories terpasang 1.00 bh Rp 1,077,010.00 Rp 1,077,010.00
7 Pek. pasang urinoir lengkap dengan aksesories terpasang 5.00 bh Rp 3,940,750.00 Rp 19,703,750.00
12 Pek. pasang bak kontrol uk. 50x50x65 cm + tutup beton tb. 10 cm 12.00 bh Rp 291,951.41 Rp 3,503,416.93
1 2 3 4 5
V PEKERJAAN KUSEN, DAUN PINTU, DAN JENDELA
1 Pek. pasang pintu type P1 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 72 cm finishing melamin, engsel
pintu steinless, handle pintu, kunci slinder. 4.00 unit Rp 38,952.05 Rp 155,808.18
2 Pek. pasang pintu type P2 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, engsel
pintu steinless, handle pintu, kunci slinder, kaca bening tb. 5 mm. 1.00 unit Rp 39,560.07 Rp 39,560.07
3 Pek. pasang pintu type P3 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 80 cm finishing melamin, engsel
pintu steinless, grendel pintu tanam, handle pintu, kunci slinder. 2.00 unit Rp 41,300.99 Rp 82,601.97
4 Pek. pasang pintu type P4 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, daun
pintu wpc uk. 210 x 42 cm finishing melamin, engsel pintu
steinless, grendel pintu tanam, pull handle pintu, kunci slinder, kaca 3.00 unit Rp 54,305.30 Rp 162,915.89
bening tb. 5 mm.
JUMLAH Rp 238,039.66
VII PEKERJAAN PLAFOND
1 2 3 4 5
X PEKERJAAN SANITAIR DAN RIOLLERING
1 Pek. pasang pipa instalasi air bersih Ø 3/4" Aw 37.45 m1 Rp 33,669.90 Rp 1,260,937.76
2 Pek. pasang pipa instalasi air bersih Ø 1" Aw 8.50 m1 Rp 40,167.16 Rp 341,420.86
3 Pek. pasang pipa instalasi air kotor Ø 3" Aw 17.46 m1 Rp 110,697.62 Rp 1,933,322.86
4 Pek. pasang pipa instalasi air kotor Ø 4" Aw 14.13 m1 Rp 164,378.94 Rp 2,322,592.23
5 Pek. pasang pipa instalasi air hujan Ø 5" D 34.00 m1 Rp 145,580.16 Rp 4,949,725.44
Pek. pasang closed duduk mono blok lengkap dengan aksesoris
6 4.00 bh Rp 6,400,174.00 Rp 25,600,696.00
terpasang
7 Pek. pasang wastafel lengkap dengan aksesories terpasang 2.00 bh Rp 1,077,010.00 Rp 2,154,020.00
Pek. pasang pintu type P1 terdiri dari : kusen aluminium 4" powder
1 coating, daun pintu wpc uk. 210 x 72 cm finishing melamin, engsel 4.00 unit Rp 38,952.05 Rp 155,808.18
pintu steinless, handle pintu, kunci slinder.
Pek. pasang pintu type P2 terdiri dari : kusen aluminium 4" powder
2 coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, engsel 1.00 unit Rp 39,560.07 Rp 39,560.07
pintu steinless, handle pintu, kunci slinder, kaca bening tb. 5 mm.
No. JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
Pek. pasang pintu type P3 terdiri dari : kusen aluminium 4" powder
3 coating, daun pintu wpc uk. 210 x 80 cm finishing melamin, engsel 2.00 unit Rp 41,300.99 Rp 82,601.97
pintu steinless, grendel pintu tanam, handle pintu, kunci slinder.
Pek. pasang pintu type P4 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, daun
4 pintu wpc uk. 210 x 42 cm finishing melamin, engsel pintu 1.00 unit Rp 54,305.30 Rp 54,305.30
steinless, grendel pintu tanam, pull handle pintu, kunci slinder, kaca
bening tb. 5 mm.
Pek. pasang pintu type P5 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, daun
5 pintu wpc uk. 210 x 42 cm finishing melamin, engsel pintu 2.00 unit Rp 56,737.40 Rp 113,474.79
steinless, grendel pintu tanam, pull handle pintu, kunci slinder, kaca
bening tb. 5 mm.
JUMLAH Rp 238,039.66
VII PEKERJAAN PLAFOND
1 2 3 4 5
Pek. pasang closed duduk mono blok lengkap dengan aksesoris
6 4.00 bh Rp 6,400,174.00 Rp 25,600,696.00
terpasang
7 Pek. pasang wastafel lengkap dengan aksesories terpasang 2.00 bh Rp 1,077,010.00 Rp 2,154,020.00
Pek. pasang pintu type P1 terdiri dari : kusen aluminium 4" powder
1 coating, daun pintu wpc uk. 210 x 72 cm finishing melamin, engsel 4.00 unit Rp 38,952.05 Rp 155,808.18
pintu steinless, handle pintu, kunci slinder.
Pek. pasang pintu type P2 terdiri dari : kusen aluminium 4" powder
2 coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, engsel 1.00 unit Rp 39,560.07 Rp 39,560.07
pintu steinless, handle pintu, kunci slinder, kaca bening tb. 5 mm.
Pek. pasang pintu type P3 terdiri dari : kusen aluminium 4" powder
3 coating, daun pintu wpc uk. 210 x 80 cm finishing melamin, engsel 2.00 unit Rp 41,300.99 Rp 82,601.97
pintu steinless, grendel pintu tanam, handle pintu, kunci slinder.
Pek. pasang pintu type P4 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, daun
4 pintu wpc uk. 210 x 42 cm finishing melamin, engsel pintu 3.00 unit Rp 54,305.30 Rp 162,915.89
steinless, grendel pintu tanam, pull handle pintu, kunci slinder, kaca
bening tb. 5 mm.
No. JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
JUMLAH Rp 48,500,085.54
VII PEKERJAAN PLAFOND
1 2 3 4 5
X PEKERJAAN PENANGKAL PETIR
1 Pek. pasang head slitz petir radius 60 m ketinggian 20 mtr 1.00 unit Rp 462,000.00 Rp 462,000.00
2 Kabel BC 1 x 70 mm2 10.00 m1 Rp - Rp -
3 Kabel NYY 1 x 70 mm2 30.00 m1 Rp 56,193.50 Rp 1,685,805.00
4 Grounding rod dia 1 " panjang 6 meter 1.00 pcs Rp 462,000.00 Rp 462,000.00
5 Bak kontrol 1.00 titik Rp - Rp -
6 Ijin Depnaker 1.00 m1 Rp - Rp -
7 Dudukan Tiang, Tiang Penangkal Petir (2 Meter) dan mtrl bantu 1.00 bh Rp 56,193.50 Rp 56,193.50
JUMLAH Rp 2,665,998.50
XI PEKERJAAN SANITAIR DAN RIOLLERING
1 Pek. pasang pipa instalasi air bersih Ø 3/4" Aw 37.45 m1 Rp 33,669.90 Rp 1,260,937.76
2 Pek. pasang pipa instalasi air bersih Ø 1" Aw 11.50 m1 Rp 40,167.16 Rp 461,922.34
3 Pek. pasang pipa instalasi air kotor Ø 3" Aw 17.46 m1 Rp 110,697.62 Rp 1,933,322.86
4 Pek. pasang pipa instalasi air kotor Ø 4" Aw 14.13 m1 Rp 164,378.94 Rp 2,322,592.23
5 Pek. pasang pipa instalasi air hujan Ø 5" D 72.04 m1 Rp 145,580.16 Rp 10,488,075.14
Pek. pasang closed duduk mono blok lengkap dengan aksesoris
6 4.00 bh Rp 6,400,174.00 Rp 25,600,696.00
terpasang
7 Pek. pasang wastafel lengkap dengan aksesories terpasang 2.00 bh Rp 1,077,010.00 Rp 2,154,020.00
8 Pek. pasang shower spray / jet washer 4.00 bh Rp 427,405.00 Rp 1,709,620.00
9 Pek. pasang kran wasatafel steinless 2.00 bh Rp 1,648,625.00 Rp 3,297,250.00
10 Pek. pasang kran air steinless 4.00 bh Rp 361,625.00 Rp 1,446,500.00
11 Pek. pasang floor drain steinless 6.00 bh Rp 321,750.00 Rp 1,930,500.00
12 Pek. pasang roof drain steinless 16.00 bh Rp 416,130.00 Rp 6,658,080.00
13 Pek. pasang tempat sabun porselen warna putih 4.00 bh Rp 311,382.50 Rp 1,245,530.00
Pek. pasang profil tank kap. 1100 liter termasuk pelampung
14 1.00 bh Rp 311,382.50 Rp 311,382.50
otomatis
JUMLAH Rp 60,820,428.83
JUMLAH TOTAL Rp 2,046,546,159.42
DAFTAR KUANTITAS DAN ESTIMATE ENGINEERING ( EE )
TERBILANG :
BACK UP VOLUME LIFT
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
II PEKERJAAN GALIAN DAN URUGAN
1 Pek. bor strous Ø 40 cm ( H= 6 meter ) 48.00 m1 48.00 1 48.00 48.00
2 Pek. galian tanah pondasi 21.00 m3 6.00 3.50 1 21.00 21.00
3 Pek. urug pasir bawah pondasi tb. 10 cm 2.10 m3 6.00 3.50 0.10 1 2.10 2.10
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
III PEKERJAAN PASANGAN
1 Pek. pasang bata merah tebal 1/2 bata, campuran 1Pc : 5Ps 180.42 m2 0.00 180.42
lantai 1 m2 4.75 7.40 35.15 180.42
lantai 2 m2 4.25 7.40 31.45 145.27
lantai 3 m2 4.25 7.40 31.45 113.82
lantai 4 m2 4.25 7.40 31.45 82.37
lantai 5 m2 3.00 14.60 43.80 50.92
atas plat atap beton m2 0.37 19.23 7.12 7.12
2 Pek. pasang bata merah tebal 1 bata, campuran 1Pc : 5Ps 133.00 m2 0.00 133.00
lantai 1 m2 4.75 7.60 36.10 133.00
lantai 2 m2 4.25 7.60 32.30 96.90
lantai 3 m2 4.25 7.60 32.30 64.60
lantai 4 m2 4.25 7.60 32.30 32.30
IV PEKERJAAN BETON
1 Pek. lantai kerja tb. 5 cm 1.05 m3 6.00 3.50 0.05 1 1.05 1.05
2 Pek. strous Ø 40 cm 6.03 m3 3.14 0.20 0.20 48.00 6.03 6.03
3 Pek. pondasi poer 580 x 330 x 60 cm type P5 11.48 m3 5.80 3.30 0.60 1 11.48 11.48
4 Pek. sloof 30x50 cm (SL1) 3.23 m3 0.30 0.50 21.50 3.23 3.23
5 Pek. kolom 40x40 cm (K2) 6.53 m3 0.40 0.40 10.20 4 6.53 6.53
6 Pek. kolom 40x60 cm (K3) 4.90 m3 0.40 0.60 10.20 2 4.90 4.90
7 Pek. kolom 25x25 cm (K4) 1.50 m3 0.25 0.25 3.00 8 1.50 1.50
8 Pek. balok 25x35 cm (B3) 1.89 m3 0.25 0.35 21.56 1.89 1.89
9 Pek. balok 25x35-50 cm (B4) 1.70 m3 0.25 0.43 15.97 1.70 1.70
10 Pek. balok 20x30 cm (B5) 1.77 m3 0.20 0.30 29.55 1.77 1.77
11 Pek. balok baja WF 200.100.5,5.8 (W) 695.23 m3 21.30 32.64 695.23 695.23
12 Pek. balok baja H beem 200.200.8.12 (W2) 342.31 m3 49.90 6.86 342.31 342.31
13 Pek. balok baja WF 250.125.6,9 (W3) 378.88 m3 29.60 12.80 378.88 378.88
14 Pek. balok baja WF 300.150.6,5.9 (W4) 286.26 m3 36.70 7.80 286.26 286.26
15 Pek. plat landas tb. 10 mm 320.75 m3 0.00 320.75
Wf 200.100.5,5.8 (W) bh 3.60 0.006 7,850.00 169.56 320.75
H beem 200.200.8.12 (W2) bh 0.36 0.006 7,850.00 16.96 151.19
Wf 250.125.6,9 (W3) bh 1.50 0.006 7,850.00 70.65 134.24
Wf 300.150.6,5.9 (W4) bh 1.35 0.006 7,850.00 63.59 63.59
16 Pek. plat penegar tb. 6 mm 63.35 m3 0.00 63.35
Wf 200.100.5,5.8 (W) bh 0.48 0.006 7,850.00 22.61 63.35
H beem 200.200.8.12 (W2) bh 0.20 0.006 7,850.00 9.42 40.74
Wf 250.125.6,9 (W3) bh 0.13 0.006 7,850.00 5.89 31.32
Wf 300.150.6,5.9 (W4) bh 0.54 0.006 7,850.00 25.43 25.43
17 Pek. anchor bolt Ø 19 mm ( H = 35 cm ) 316.00 bh 0.00 316.00
Wf 200.100.5,5.8 (W) bh 144 144.00 316.00
H beem 200.200.8.12 (W2) bh 12 12.00 172.00
Wf 250.125.6,9 (W3) bh 64 64.00 160.00
Wf 300.150.6,5.9 (W4) bh 96 96.00 96.00
18 Pek. mur baut HTB Ø 19 mm 316.00 bh 0.00 316.00
Wf 200.100.5,5.8 (W) bh 144 144.00 316.00
H beem 200.200.8.12 (W2) bh 12 12.00 172.00
Wf 250.125.6,9 (W3) bh 64 64.00 160.00
Wf 300.150.6,5.9 (W4) bh 96 96.00 96.00
19 Pek. plat atap beton tb.12 cm elv. + 17.55 4.62 m3 38.51 0.12 4.62 4.62
20 Pek. plat atap beton tb.12 cm elv. + 20.50 3.60 m3 6.25 4.80 0.12 3.60 3.60
21 Pek. plat dinding beton tb. 20 cm 4.73 m3 0.20 1.30 18.20 4.73 4.73
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
V PEKERJAAN PLESTERAN
1 Pek. plesteran bata 1Pc : 5Ps 626.83 m2 313.42 2 626.83 626.83
2 Pek. acian 906.68 m2 0.00 906.68
lantai 1 plesteran 1/2 bata campuran 1Ps : 5Ps m2 4.75 7.40 2 70.30 906.68
lantai 2 plesteran 1/2 bata campuran 1Ps : 5Ps m2 4.25 7.40 2 62.90 836.38
lantai 3 plesteran 1/2 bata campuran 1Ps : 5Ps m2 4.25 7.40 2 62.90 773.48
lantai 4 plesteran 1/2 bata campuran 1Ps : 5Ps m2 4.25 7.40 2 62.90 710.58
lantai 5 plesteran 1/2 bata campuran 1Ps : 5Ps m2 3.00 14.60 2 87.60 647.68
atas plat atap beton plesteran 1/2 bata campuran 1Ps : 5Ps m2 0.37 19.23 2 14.23 560.08
lantai 1 plesteran 1 bata campuran 1Ps : 5Ps m2 4.75 7.60 2 72.20 545.85
lantai 2 plesteran 1 bata campuran 1Ps : 5Ps m2 4.25 7.60 2 64.60 473.65
lantai 3 plesteran 1/2 bata campuran 1Ps : 5Ps m2 4.25 7.60 2 64.60 409.05
lantai 4 plesteran 1/2 bata campuran 1Ps : 5Ps m2 4.25 7.60 2 64.60 344.45
Pek. sloof 30x50 cm (SL1) m2 0.80 21.50 17.20 279.85
Pek. kolom 40x40 cm (K2) m2 1.30 10.20 4 53.04 262.65
Pek. kolom 40x60 cm (K3) m2 1.70 10.20 2 34.68 209.61
Pek. kolom 25x25 cm (K4) m2 0.70 3.00 8 16.80 174.93
Pek. balok 25x35 cm (B3) m2 0.90 21.56 19.40 158.13
Pek. balok 25x35-50 cm (B4) m2 1.05 15.97 16.77 138.73
Pek. balok 20x30 cm (B5) m2 0.70 29.55 20.69 121.96
Pek. plat atap beton tb.12 cm elv. + 17.55 m2 38.51 38.51 101.27
Pek. plat atap beton tb.12 cm elv. + 20.50 m2 6.25 4.80 30.00 62.76
Pek. plat dinding beton tb. 20 cm m2 1.80 18.20 32.76 32.76
3 Pek. benangan sudut 347.56 m1 0.00 347.56
Pek. sloof 30x50 cm (SL1) m1 2 21.50 43.00 347.56
Pek. kolom 40x40 cm (K2) m1 2 10.20 4 81.60 304.56
Pek. kolom 40x60 cm (K3) m1 2 10.20 2 40.80 222.96
Pek. kolom 25x25 cm (K4) m1 2 3.00 8 48.00 182.16
Pek. balok 25x35 cm (B3) m1 2 21.56 43.12 134.16
Pek. balok 25x35-50 cm (B4) m1 2 15.97 31.94 91.04
Pek. balok 20x30 cm (B5) m1 2 29.55 59.10 59.10
1 Pek. Lift pasengger Kaps. 1000 Kg, (Lengkap & Terpasang) 2.00 unit 2 2.00 2.00
1 2 3 4 5 6 7 8 9 10 11
I PEKERJAAN PERSIAPAN
1 Pek. pembersihan lokasi awal 1.00 ls 1 1.00 1.00
1 2 3 4 5 6 7 8 9 10 11
III PEKERJAAN PASANGAN
1 Pek. pasang bata merah tebal 1/2 bata, campuran 1Pc : 5Ps 370.48 m2 0.00 370.48
pasangan lantai 1 arah horinzontal posisi bagian bawah m2 1.00 50.95 50.95 370.48
pasangan lantai 1 arah horinzontal posisi bagian bawah wudhu m2 1.00 3.42 3.42 319.53
pasangan lantai 1 arah horinzontal posisi bagian atas m2 5.25 26.03 136.66 316.11
pasangan lantai 1 arah horinzontal posisi bagian dalam m2 5.25 12.87 67.57 179.46
pasangan lantai 1 arah vertical m2 5.25 28.22 148.16 111.89
kurangi luasan kusen lantai 1 P2 m2 (1.89) 5 (9.46) (36.27)
kurangi luasan kusen lantai 1 P3 m2 (1.68) 2 (3.37) (26.81)
kurangi luasan kusen lantai 1 P4 m2 (2.80) 1 (2.80) (23.44)
kurangi luasan kusen lantai 1 P6 m2 (14.66) 1 (14.66) (20.64)
kurangi luasan kusen lantai 1 J1 m2 (2.99) 2 (5.98) (5.98)
2 Pek. pasang bata merah tebal 1 bata, campuran 1Pc : 3Ps, rollag 3.68 m2 0.45 8.18 3.68 3.68
IV PEKERJAAN BETON
1 Pek. lantai kerja tb. 5 cm 9.36 m3 0.00 9.36
poer type P1 m3 2.20 1.20 0.05 4 0.53 9.36
poer type P2 m3 3.40 1.20 0.05 7 1.43 8.83
poer type P3 m3 2.20 2.20 0.05 12 2.90 7.40
poer type P4 m3 3.00 3.00 0.05 10 4.50 4.50
2 Pek. rabatan lantai tb. 5 cm 19.30 m3 385.96 0.05 19.30 19.30
3 Pek. rabatan beton tb. 8 cm ( ramp ) 0.44 m3 9.23 0.60 0.08 0.44 0.44
4 Pek. strous Ø 40 cm 95.71 m3 3.14 0.20 0.20 762.00 95.71 95.71
5 Pek. pondasi poer 200 x 100 x 60 cm type P1 4.80 m3 2.00 1.00 0.60 4 4.80 4.80
6 Pek. pondasi poer 320 x 100 x 60 cm type P2 13.44 m3 3.20 1.00 0.60 7 13.44 13.44
7 Pek. pondasi poer 200 x 200 x 60 cm type P3 28.80 m3 2.00 2.00 0.60 12 28.80 28.80
8 Pek. pondasi poer 280 x 280 x 60 cm type P4 47.04 m3 2.80 2.80 0.60 10 47.04 47.04
9 Pek. sloof 30x50 cm (SL1) 34.72 m3 0.00 34.72
Atap kecil m3 0.30 0.50 98.88 14.83 34.72
Atap besar m3 0.30 0.50 132.58 19.89 19.89
10 Pek. kolom 40x60 cm (K1) 31.74 m3 0.40 0.60 5.75 23 31.74 31.74
11 Pek. kolom 40x40 cm (K2) 9.20 m3 0.40 0.40 5.75 10 9.20 9.20
12 Pek. kolom praktis 12x15 cm (Kp) 1.56 m3 0.00 1.56
kolom dinding m3 0.12 0.15 5.25 15 1.42 1.56
peninggian pagar samping m3 0.12 0.15 1.00 8 0.14 0.14
13 Pek. balok latei 12x20 cm (BL1) 0.49 m3 0.12 0.20 20.50 0.49 0.49
14 Pek. balok leufel 12x20 cm (BL2) 0.11 m3 0.12 0.20 4.55 0.11 0.11
15 Pek. ring balk 12x20 cm (RB1) 1.29 m3 0.12 0.20 53.60 1.29 1.29
16 Pek. plat leufel tb.10 cm 0.14 m3 0.30 0.10 4.55 0.14 0.14
17 Pek. plat beton meja wastafel tb. 8 cm 0.07 m3 1.35 0.65 0.08 1 0.07 0.07
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
V PEKERJAAN PLESTERAN
1 Pek. plesteran bata 1Pc : 5Ps 740.97 m2 370.48 2 740.97 740.97
2 Pek. acian 989.81 m2 0.00 989.81
acian dinding m2 370.48 2 740.97 989.81
plat leufel m2 0.30 4.55 1.37 248.84
kolom K1 m2 1.70 4.75 23.00 185.73 247.48
kolom K2 m2 1.30 4.75 10.00 61.75 61.75
3 Pek. benangan sudut 386.03 m1 0.00 386.03
kusen lantai 1 P2 m1 3.78 5 18.92 386.03
kusen lantai 1 P3 m1 3.37 2 6.73 367.11
kusen lantai 1 P4 m1 5.59 1 5.59 360.38
kusen lantai 1 P6 m1 29.33 1 29.33 354.79
kusen lantai 1 J1 m1 5.98 2 11.96 325.46
kolom K1 m1 2 4.75 23 218.50 313.50
kolom K2 m1 2 4.75 10 95.00 95.00
Pek. pasang pintu type P2 terdiri dari : kusen aluminium 4" powder
1 coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, engsel 5.00 unit 5 5.00 5.00
pintu steinless, handle pintu, kunci slinder, kaca bening tb. 5 mm.
Pek. pasang pintu type P3 terdiri dari : kusen aluminium 4" powder
2 coating, daun pintu wpc uk. 150 x 52 cm finishing melamin, engsel 2.00 unit 2 2.00 2.00
pintu steinless, grendel pintu tanam, handle pintu, kunci slinder.
Pek. pasang pintu type P4 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, daun
3 pintu wpc uk. 210 x 42 cm finishing melamin, engsel pintu 1.00 unit 1 1.00 1.00
steinless, grendel pintu tanam, pull handle pintu, kunci slinder,
kaca bening tb. 5 mm.
Pek. pasang pintu type P6 terdiri dari : kusen kayu jati 8/15 cm,
daun pintu panil + jalusi papan kayu jati, rel atas bawah, engsel
4 1.00 unit 1 1.00 1.00
roda atas bawah, engsel pintu atas tengah bawah, double pull
handle, kunci pintu, grendel pintu atas bawah, finishing melamin.
1 2 3 4 5 6 7 8 9 10 11
VIII PEKERJAAN PLAFOND
1 Pek. pasang gypsumboard tb. 9 mm + rangka hollow galvalume 376.69 m2 0.00 376.69
□40.40.0,6 mm termasuk penggantung hollow galvalume □
20.40.0,6 mm
IX PEKERJAAN PENGECATAN
1 Pek. cat dinding interior 891.24 m2 891.24 891.24 891.24
2 Pek. cat plafond 376.69 m2 376.69 376.69 376.69
3 Pek. cat list gypsum 26.07 m2 0.10 260.72 26.07 26.07
1 2 3 4 5 6 7 8 9 10 11
7 Pek. pasang urinoir lengkap dengan aksesories terpasang 5.00 bh 0.00 5.00
KM type 1 bh 5 5.00 5.00
8 Pek. pasang kran wasatafel steinless 1.00 bh 1 1.00 1.00
9 Pek. pasang kran air steinless 6.00 bh 0.00 6.00
Tempat Wudhu bh 6 6.00 6.00
10 Pek. pasang floor drain steinless 4.00 bh 0.00 4.00
KM type 1 bh 2 2.00 4.00
Tempat Wudhu bh 2 2.00 2.00
Pek. pasang saluran buis beton U 40 cm dalam 50 cm + tutup
11 69.50 m1 69.50 69.50 69.50
beton tb. 10 cm
12 Pek. pasang bak kontrol uk. 50x50x65 cm + tutup beton tb. 10 cm 12.00 bh 12 12.00 12.00
13 Pek. pasang tandon jadi bawah beton jadi kapasitas 5 m3 1.00 bh 1 1.00 1.00
14 Pek. pasang septictank 3 lubang + 1 sumur resapan 1.00 bh 1 1.00 1.00
15 Pek. pasang pompa air jet pump grundfos 1.00 bh 1 1.00 1.00
1 2 3 4 5 6 7 8 9 10 11
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
I PEKERJAAN PASANGAN
1 Pek. pasang bata merah tebal 1/2 bata, campuran 1Pc : 5Ps 611.64 m2 0.00 611.64
pasangan lantai 2 arah horinzontal posisi bagian bawah m2 3.95 50.60 199.87 611.64
pasangan lantai 2 arah horinzontal posisi bagian atas m2 3.95 42.83 169.18 411.77
pasangan lantai 2 arah horinzontal posisi bagian dalam m2 3.95 25.46 100.57 242.59
pasangan lantai 2 arah vertical posisi bagian samping m2 3.95 14.60 57.67 142.02
pasangan lantai 2 arah vertical posisi bagian dalam m2 3.95 38.63 152.59 84.35
kurangi luasan kusen lantai 2 P1 m2 (1.89) 4 (7.57) (68.24)
kurangi luasan kusen lantai 2 P2 m2 (1.89) 1 (1.89) (60.67)
kurangi luasan kusen lantai 2 P3 m2 (1.68) 2 (3.37) (58.78)
kurangi luasan kusen lantai 2 P4 m2 (2.80) 3 (8.39) (55.41)
kurangi luasan kusen lantai 2 J1 m2 (2.99) 5 (14.95) (47.03)
kurangi luasan kusen lantai 2 J2 m2 (2.99) 1 (2.99) (32.08)
kurangi luasan kusen lantai 2 BV m2 (0.58) 6 (3.49) (29.09)
kurangi luasan kusen lantai 2 GS m2 (1.28) 20 (25.60) (25.60)
II PEKERJAAN BETON
1 Pek. kolom 40x40 cm (K2) 4.08 m3 0.00 4.08
lantai 2 m3 0.40 0.40 4.25 6 4.08 4.08
2 Pek. kolom 40x60 cm (K3) 24.48 m3 0.00 24.48
lantai 2 m3 0.40 0.60 4.25 24 24.48 24.48
3 Pek. kolom praktis 12x15 cm (Kp) 3.57 m3 0.00 3.57
lantai 2 m3 0.12 0.20 4.25 35 3.57 3.57
4 Pek. balok latei 12x20 cm (BL1) 0.51 m3 0.00 0.51
lantai 2 m3 0.12 0.20 21.26 0.51 0.51
5 Pek. balok leufel 12x20 cm (BL2) 0.42 m3 0.00 0.42
lantai 2 m3 0.12 0.20 17.56 0.42 0.42
6 Pek. balok bordes 30x50 cm (BD) 1.16 m3 0.00 1.16
lantai 2 m3 0.30 0.50 7.73 1.16 1.16
7 Pek. balok 40x60 cm (B1) 19.37 m3 0.00 19.37
lantai 2 atap kecil m3 0.40 0.60 47.45 11.39 19.37
lantai 2 atap besar m3 0.40 0.60 33.25 7.98 7.98
8 Pek. balok 30x40 cm (B2) 14.71 m3 0.00 14.71
lantai 2 atap kecil m3 0.30 0.40 51.76 6.21 14.71
lantai 2 atap besar m3 0.30 0.40 70.80 8.50 8.50
9 Pek. balok 25x35 cm (B3) 6.35 m3 0.00 6.35
lantai 2 atap kecil m3 0.25 0.35 27.17 2.38 6.35
lantai 2 atap besar m3 0.25 0.35 45.41 3.97 3.97
10 Pek. balok lisplank 15x20 cm 0.25 m3 0.00 0.25
lantai 2 m3 0.15 0.20 8.40 0.25 0.25
11 Pek. plat lantai tb. 12 cm 45.64 m3 0.00 45.64
lantai 3 atap kecil m3 26.33 6.25 0.12 19.75 45.64
lantai 3 atap besar m3 24.62 6.22 0.12 18.38 25.89
lantai 3 atap besar posisi balkon m3 18.08 2.15 0.12 4.66 7.52
lantai 3 atap besar selah void tangga m3 23.78 0.12 2.85 2.85
12 Pek. plat lisplank beton tb. 10 cm 0.67 m3 0.00 0.67
lantai 2 m3 0.80 0.10 8.40 0.67 0.67
13 Pek. plat atap beton tb. 10 cm 3.31 m3 0.00 3.31
lantai 2 posisi As M N O m3 6.25 5.30 0.10 3.31 3.31
14 Pek. plat leufel tb. 10 cm 0.53 m3 0.00 0.53
lantai 2 m3 0.30 0.10 17.56 0.53 0.53
15 Pek. plat beton meja wastafel tb. 8 cm 0.12 m3 1.20 0.65 0.08 2 0.12 0.12
16 Pek. plat tangga beton tb. 15 cm 1.87 m3 0.00 1.87
plat tangga m3 1.05 0.15 8.10 1.28 1.87
plat bordes tangga m3 2.10 1.90 0.15 0.60 0.60
17 Pek. anak tangga beton 0.67 m3 0.03 1.05 25 0.67 0.67
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
III PEKERJAAN PLESTERAN
1 Pek. plesteran bata 1Pc : 5Ps 1,223.27 m2 611.64 2 1,223.27 1,223.27
2 Pek. acian 1,661.78 m2 0.00 1,661.78
acian dinding m2 611.64 2 1,223.27 1,661.78
plat leufel m2 0.70 17.56 12.29 438.50
plat tangga m2 12.50 12.50 426.21
kolom K2 m2 1.60 4.25 6 40.80 413.72
kolom K3 m2 2.00 4.25 24 204.00 372.92
balok bordes m2 0.80 7.73 6.18 168.92
lisplank beton m2 1.80 8.40 15.12 162.73
balok lisplank beton m2 0.20 8.40 1.68 147.61
balok B3 posisi balok konsol m2 0.85 16.97 14.42 145.93
balok B2 bagian luar m2 1.20 101.90 122.28 131.51
balok B1 bagian luar m2 1.20 7.69 9.23 9.23
3 Pek. benangan sudut 1,276.28 m1 0.00 1,276.28
kusen lantai 3 P1 m1 6.06 2 4 48.48 1,276.28
kusen lantai 3 P2 m1 6.06 2 1 12.12 1,227.80
kusen lantai 3 P3 m1 5.26 2 2 21.04 1,215.68
kusen lantai 3 P4 m1 6.90 2 3 41.40 1,194.64
kusen lantai 3 J1 m1 7.20 2 5 72.00 1,153.24
kusen lantai 3 J2 m1 7.20 2 1 14.40 1,081.24
kusen lantai 3 BV m1 3.06 2 6 36.72 1,066.84
kusen lantai 3 GS m1 4.80 2 20 192.00 1,030.12
kolom K2 m1 4.25 4 6 102.00 838.12
kolom K3 m1 4.25 4 24 408.00 736.12
balok bordes m1 7.73 2 15.46 328.12
lisplank beton m1 8.40 2 16.80 312.66
balok lisplank beton m1 8.40 2 16.80 295.86
balok B3 posisi balok konsol m1 16.97 2 33.94 279.06
balok B2 m1 122.56 2 245.12 245.12
Pek. pasang pintu type P1 terdiri dari : kusen aluminium 4" powder
1 coating, daun pintu wpc uk. 210 x 72 cm finishing melamin, engsel 4.00 unit 4 4.00 4.00
pintu steinless, handle pintu, kunci slinder.
Pek. pasang pintu type P2 terdiri dari : kusen aluminium 4" powder
2 coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, engsel 1.00 unit 1 1.00 1.00
pintu steinless, handle pintu, kunci slinder, kaca bening tb. 5 mm.
Pek. pasang pintu type P3 terdiri dari : kusen aluminium 4" powder
3 coating, daun pintu wpc uk. 210 x 80 cm finishing melamin, engsel 2.00 unit 2 2.00 2.00
pintu steinless, grendel pintu tanam, handle pintu, kunci slinder.
Pek. pasang pintu type P4 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, daun
4 pintu wpc uk. 210 x 42 cm finishing melamin, engsel pintu steinless, 3.00 unit 3 3.00 3.00
grendel pintu tanam, pull handle pintu, kunci slinder, kaca bening tb.
5 mm.
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8 9 10 11
VI PEKERJAAN RAILLING
1 Pek. pasang railing tangga hollow galvanis 50.50.1 mm + 20.40.1 20.46 m1 20.46 20.46 20.46
mm finishing cat, dan handril 5/7 cm kayu jati finishing melamin
( Tinggi = 100 cm ) termasuk material pendukung terpasang .
7 Pek. pasang wastafel lengkap dengan aksesories terpasang 2.00 bh 2.00 2.00
2
1 2 3 4 5 6 7 8 9 10 11
BACK UP VOLUME LANTAI 3
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
I PEKERJAAN PASANGAN
1 Pek. pasang bata merah tebal 1/2 bata, campuran 1Pc : 5Ps 643.42 m2 0.00 643.42
pasangan lantai 3 arah horinzontal posisi bagian bawah m2 3.95 44.70 176.57 643.42
pasangan lantai 3 arah horinzontal posisi bagian atas m2 3.95 55.62 219.70 466.86
pasangan lantai 3 arah horinzontal posisi bagian dalam m2 3.95 39.92 157.68 247.16
pasangan lantai 3 arah vertical posisi bagian samping m2 3.95 12.47 49.26 89.47
pasangan lantai 3 arah vertical posisi bagian dalam m2 3.95 32.14 126.95 40.22
kurangi luasan kusen lantai 3 P1 m2 (1.89) 4 (7.57) (86.74)
kurangi luasan kusen lantai 3 P2 m2 (1.89) 1 (1.89) (79.17)
kurangi luasan kusen lantai 3 P3 m2 (1.68) 2 (3.37) (77.28)
kurangi luasan kusen lantai 3 P4 m2 (2.80) 1 (2.80) (73.91)
kurangi luasan kusen lantai 3 P5 m2 (3.66) 2 (7.31) (71.11)
kurangi luasan kusen lantai 3 J1 m2 (2.99) 7 (20.93) (63.80)
kurangi luasan kusen lantai 3 J2 m2 (2.99) 5 (14.95) (42.87)
kurangi luasan kusen lantai 3 BV m2 (0.58) 4 (2.32) (27.92)
kurangi luasan kusen lantai 3 GS m2 (1.28) 20 (25.60) (25.60)
II PEKERJAAN BETON
1 Pek. kolom 40x40 cm (K2) 4.08 m3 0.00 4.08
lantai 3 m3 0.40 0.40 4.25 6 4.08 4.08
2 Pek. kolom 40x60 cm (K3) 26.04 m3 0.00 26.04
lantai 3 m3 0.40 0.60 4.52 24 26.04 26.04
3 Pek. kolom praktis 12x15 cm (Kp) 2.68 m3 0.00 2.68
lantai 3 m3 0.12 0.15 4.25 35 2.68 2.68
4 Pek. balok latei 12x20 cm (BL1) 0.55 m3 0.00 0.55
lantai 3 m3 0.12 0.20 23.01 0.55 0.55
5 Pek. balok leufel 12x20 cm (BL2) 0.92 m3 0.00 0.92
lantai 3 m3 0.12 0.20 38.26 0.92 0.92
6 Pek. balok bordes 30x50 cm (BD) 1.16 m3 0.00 1.16
lantai 3 m3 0.30 0.50 7.73 1.16 1.16
7 Pek. balok 40x60 cm (B1) 16.20 m3 0.00 16.20
lantai 3 atap kecil m3 0.40 0.60 34.25 8.22 16.20
lantai 3 atap besar m3 0.40 0.60 33.25 7.98 7.98
8 Pek. balok 30x40 cm (B2) 15.41 m3 0.00 15.41
lantai 3 atap kecil m3 0.30 0.40 40.16 4.82 15.41
lantai 3 atap besar m3 0.30 0.40 88.27 10.59 10.59
9 Pek. balok 25x35 cm (B3) 6.21 m3 0.00 6.21
lantai 3 atap kecil m3 0.25 0.35 20.08 1.76 6.21
lantai 3 atap besar m3 0.25 0.35 50.87 4.45 4.45
10 Pek. balok lisplank 15x20 cm 0.06 m3 0.00 0.06
lantai 3 m3 0.15 0.20 2.15 0.06 0.06
11 Pek. plat lantai tb.12 cm 31.56 m3 0.00 31.56
lantai 3 atap kecil m3 92.09 0.12 11.05 31.56
lantai 3 atap besar m3 147.15 0.12 17.66 20.51
lantai 3 atap besar selah void tangga m3 23.78 0.12 2.85 2.85
12 Pek. plat lisplank beton tb. 10 cm 0.17 m3 0.00 0.17
lantai 3 0.80 0.10 2.15 0.17 0.17
13 Pek. plat leufel tb.10 cm 1.15 m3 0.00 1.15
lantai 3 0.30 0.10 38.26 1.15 1.15
14 Pek. plat beton meja wastafel tb. 8 cm 0.12 m3 1.20 0.65 0.08 2 0.12 0.12
15 Pek. plat tangga beton tb. 15 cm 1.87 m3 0.00 1.87
plat tangga m3 1.05 0.15 8.10 1.28 1.87
plat bordes tangga m3 2.10 1.90 0.15 0.60 0.60
16 Pek. anak tangga beton 0.67 m3 0.03 1.05 25 0.67 0.67
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
III PEKERJAAN PLESTERAN
1 Pek. plesteran bata 1Pc : 5Ps 1,286.85 m2 643.42 2 1,286.85 1,286.85
2 Pek. acian 1,703.95 m2 0.00 1,703.95
acian dinding m2 643.42 2 1,286.85 1,703.95
plat leufel m2 0.70 38.26 2 53.56 417.10
plat tangga m2 12.50 12.50 363.54
kolom K2 m2 1.60 4.25 6 40.80 351.04
kolom K3 m2 2.00 4.52 24 216.96 310.24
balok bordes m2 0.80 7.73 6.18 93.28
lisplank beton m1 1.80 2.15 3.87 87.10
balok lisplank beton m1 0.20 2.15 0.43 83.23
balok B3 posisi balok konsol m1 0.55 10.75 5.91 82.80
balok B2 bagian luar m1 0.55 128.43 70.64 76.89
balok B1 bagian luar m1 1.00 6.25 6.25 6.25
3 Pek. benangan sudut 1,356.01 m1 0.00 1,356.01
kusen lantai 3 P1 m1 6.06 2 4 48.48 1,356.01
kusen lantai 3 P2 m1 6.06 2 1 12.12 1,307.53
kusen lantai 3 P3 m1 5.26 2 2 21.04 1,295.41
kusen lantai 3 P4 m1 6.90 2 1 13.80 1,274.37
kusen lantai 3 P5 m1 7.70 2 2 30.80 1,260.57
kusen lantai 3 J1 m1 7.20 2 7 100.80 1,229.77
kusen lantai 3 J2 m1 7.20 2 5 72.00 1,128.97
kusen lantai 3 BV m1 3.06 2 4 24.48 1,056.97
kusen lantai 3 GS m1 4.80 2 20 192.00 1,032.49
kolom K2 m1 4.25 4 6 102.00 840.49
kolom K3 m1 4.52 4 24 433.92 738.49
balok bordes m1 7.73 2 15.46 304.57
lisplank beton m1 2.15 4 8.60 289.11
balok lisplank beton m1 2.15 1 2.15 280.51
balok B3 posisi balok konsol m1 10.75 2 21.50 278.36
balok B2 m1 128.43 2 256.86 256.86
Pek. pasang pintu type P1 terdiri dari : kusen aluminium 4" powder
1 coating, daun pintu wpc uk. 210 x 72 cm finishing melamin, engsel 4.00 unit 4 4.00 4.00
pintu steinless, handle pintu, kunci slinder.
Pek. pasang pintu type P2 terdiri dari : kusen aluminium 4" powder
2 coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, engsel 1.00 unit 1 1.00 1.00
pintu steinless, handle pintu, kunci slinder, kaca bening tb. 5 mm.
Pek. pasang pintu type P3 terdiri dari : kusen aluminium 4" powder
3 coating, daun pintu wpc uk. 210 x 80 cm finishing melamin, engsel 2.00 unit 2 2.00 2.00
pintu steinless, grendel pintu tanam, handle pintu, kunci slinder.
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
Pek. pasang pintu type P4 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, daun
4 pintu wpc uk. 210 x 42 cm finishing melamin, engsel pintu steinless, 1.00 unit 1 1.00 1.00
grendel pintu tanam, pull handle pintu, kunci slinder, kaca bening tb.
5 mm.
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
Pek. pasang pintu type P5 terdiri dari : kusen aluminium 4" powder
coating, daun pintu wpc uk. 210 x 82 cm finishing melamin, daun
5 pintu wpc uk. 210 x 42 cm finishing melamin, engsel pintu steinless, 2.00 unit 2 2.00 2.00
grendel pintu tanam, pull handle pintu, kunci slinder, kaca bening tb.
5 mm.
VI PEKERJAAN RAILLING
1 Pek. pasang railing tangga hollow galvanis 50.50.1 mm + 20.40.1 20.46 m1 20.46 20.46 20.46
mm finishing cat, dan handril 5/7 cm kayu jati finishing melamin
( Tinggi = 100 cm ) termasuk material pendukung terpasang .
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
VII PEKERJAAN PLAFOND
1 Pek. pasang gypsumboard tb. 9 mm + rangka hollow galvalume 299.04 m2 0.00 299.04
□40.40.0,6 mm termasuk penggantung hollow galvalume □ 20.40.0,6
mm
Lantai 3 m2 290.04 290.04 299.04
KM type 3 m2 1.50 1.50 4 9.00 9.00
2 Pek. pasang list gypsum 226.30 m1 0.00 226.30
Lantai 3 m1 202.30 202.30 226.30
KM type 3 m1 6.00 4 24.00 24.00
7 Pek. pasang wastafel lengkap dengan aksesories terpasang 2.00 bh 2.00 2.00
2
1 2 3 4 5 6 7 8 9 10 11
I PEKERJAAN PASANGAN
1 Pek. pasang bata merah tebal 1/2 bata, campuran 1Pc : 5Ps 704.15 m2 0.00 704.15
pasangan lantai 4 arah horinzontal posisi bagian bawah m2 4.00 44.70 178.80 704.15
pasangan lantai 4 arah horinzontal posisi bagian atas m2 4.00 55.62 222.48 525.35
pasangan lantai 4 arah horinzontal posisi bagian dalam m2 4.00 39.92 159.68 302.87
pasangan lantai 4 arah vertical posisi bagian samping m2 4.00 12.47 49.88 143.19
pasangan lantai 4 arah vertical posisi bagian dalam m2 4.00 32.14 128.56 93.31
pasangan antara kolom kuda" atap kecil m2 0.80 41.96 33.57 (35.25)
pasangan antara kolom kuda" atap besar m2 0.80 39.52 31.62 (68.82)
atas balok talang m2 0.30 50.98 15.29 (100.43)
kurangi luasan kusen lantai 4 P1 m2 (1.89) 4 (7.57) (115.73)
kurangi luasan kusen lantai 4 P2 m2 (1.89) 1 (1.89) (108.16)
kurangi luasan kusen lantai 4 P3 m2 (1.68) 2 (3.37) (106.27)
kurangi luasan kusen lantai 4 P4 m2 (2.80) 3 (8.39) (102.90)
kurangi luasan kusen lantai 4 J1 m2 (2.99) 4 (11.96) (94.52)
kurangi luasan kusen lantai 4 J2 m2 (2.99) 15 (44.85) (82.56)
kurangi luasan kusen lantai 4 J3 m2 (4.60) 2 (9.20) (37.71)
kurangi luasan kusen lantai 4 BV m2 (0.58) 5 (2.91) (28.51)
kurangi luasan kusen lantai 4 GS m2 (1.28) 20 (25.60) (25.60)
II PEKERJAAN BETON
1 Pek. kolom 40x40 cm (K2) 0.68 m3 0.00 0.68
Lantai 4 atap besar m3 0.40 0.40 4.25 1 0.68 0.68
2 Pek. kolom 40x60 cm (K3) 24.48 m3 0.00 24.48
lantai 4 atap kecil m3 0.40 0.60 4.25 12 12.24 24.48
lantai 4 atap besar m3 0.40 0.60 4.25 12 12.24 12.24
3 Pek. kolom 25x25 cm (K4) 4.48 m3 0.00 4.48
atap kecil m3 0.40 0.40 1.00 14 2.24 4.48
atap besar m3 0.40 0.40 1.00 14 2.24 2.24
4 Pek. kolom praktis 12x15 cm (Kp) 3.06 m3 0.00 3.06
lantai 4 m3 0.12 0.15 4.25 40 3.06 3.06
5 Pek. balok latei 12x20 cm (BL1) 0.62 m3 0.00 0.62
lantai 4 m3 0.12 0.20 25.95 0.62 0.62
6 Pek. balok leufel 12x20 cm (BL2) 1.27 m3 0.00 1.27
lantai 4 m3 0.12 0.20 52.93 1.27 1.27
7 Pek. balok 40x60 cm (B1) 17.12 m3 0.00 17.12
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
lantai 4 atap kecil m3 0.40 0.60 35.79 8.59 17.12
lantai 4 atap besar m3 0.40 0.60 35.56 8.53 8.53
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
8 Pek. balok 30x40 cm (B2) 10.46 m3 0.00 10.46
lantai 4 atap kecil m3 0.30 0.40 40.16 4.82 10.46
lantai 4 atap besar m3 0.30 0.40 47.04 5.64 5.64
9 Pek. balok 25x35 cm (B3) 5.90 m3 0.00 5.90
lantai 4 atap kecil m3 0.25 0.35 20.08 1.76 5.90
lantai 4 atap besar m3 0.25 0.35 47.32 4.14 4.14
10 Pek. balok 25x35-50 cm (B4) 5.77 m3 0.00 5.77
posisi rencana balok atap kecill m3 0.25 0.43 25.35 2.69 5.77
posisi rencana balok atap besar m3 0.25 0.43 28.95 3.08 3.08
11 Pek. balok 20x30 cm (B5) 10.77 m3 0.00 10.77
lantai 4 atap besar m3 0.20 0.30 10.75 0.65 10.77
posisi rencana balok atap kecill m3 0.20 0.30 80.00 4.80 10.13
posisi rencana balok atap besar m3 0.20 0.30 88.80 5.33 5.33
12 Pek. balok 25x40cm (B6) 3.63 m3 0.00 3.63
posisi rencana balok atap kecill m3 0.25 0.40 19.60 1.96 3.63
posisi rencana balok atap besar m3 0.25 0.40 16.68 1.67 1.67
13 Pek. balok lisplank 15x20 cm 1.93 m3 0.00 1.93
posisi rencana balok atap kecill m3 0.15 0.20 36.35 1.09 1.93
posisi rencana balok atap besar m3 0.15 0.20 27.89 0.84 0.84
14 Pek. plat lantai tb.12 cm 31.40 m3 0.00 31.40
lantai 4 atap kecil m3 90.35 0.12 10.84 31.40
lantai 4 atap besar m3 147.52 0.12 17.70 20.56
lantai 4 atap besar selah void tangga m3 23.78 0.12 2.85 2.85
15 Pek. plat lisplank beton tb. 10 cm 5.14 m3 0.00 5.14
posisi rencana balok atap kecill m3 0.80 0.10 36.35 2.91 5.14
posisi rencana balok atap besar m3 0.80 0.10 27.89 2.23 2.23
16 Pek. plat atap beton tb.10 cm 18.47 m3 0.00 18.47
posisi rencana balok atap kecill m3 148.04 0.10 14.80 18.47
kurangi void atap kecil m3 (52.35) 0.10 (5.24) 3.66
posisi rencana balok atap besar m3 168.01 0.10 16.80 8.90
kurangi void atap besar m3 (79.04) 0.10 (7.90) (7.90)
17 Pek. plat leufel tb.10 cm 1.59 m3 0.00 1.59
lantai 4 atap kecil m3 0.30 0.10 26.55 0.80 1.59
lantai 4 atap besar m3 0.30 0.10 26.39 0.79 0.79
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
III PEKERJAAN PLESTERAN
1 Pek. plesteran bata 1Pc : 5Ps 1,408.30 m2 704.15 2 1,408.30 1,408.30
2 Pek. acian 2,048.96 m2 0.00 2,048.96
acian dinding m2 704.15 2 1,408.30 2,048.96
kolom K2 m2 1.60 4.25 1 6.80 640.65
kolom K3 atap kecil m2 2.00 4.25 12 102.00 633.85
kolom K3 atap besar m2 2.00 4.25 12 102.00 531.85
kolom K4 atap kecil m2 0.70 1.00 14 9.80 429.85
kolom K4 atap besar m2 0.70 1.00 14 9.80 420.05
balok B1 bagian luar m2 1.00 8.14 8.14 410.25
balok B2 bagian luar m2 0.55 70.93 39.01 402.11
balok B3 bagian luar m2 0.55 6.22 3.42 363.10
balok B5 bagian luar m2 0.40 18.18 7.27 359.68
balok B5 posisi balkon m2 0.70 10.75 7.53 352.41
balok lisplank m2 0.20 64.23 12.85 344.88
lisplank beton m2 1.80 64.23 115.62 332.04
plat beton m2 184.65 184.65 216.42
plat leufel m2 31.76 31.76 31.76
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
3 Pek. benangan sudut 1,239.64 m1 0.00 1,239.64
kusen lantai 4 P1 m1 6.06 2 4 48.48 1,239.64
kusen lantai 4 P2 m1 6.06 2 1 12.12 1,191.16
kusen lantai 4 P3 m1 5.26 2 2 21.04 1,179.04
kusen lantai 4 P4 m1 6.90 2 3 41.40 1,158.00
kusen lantai 4 J1 m1 7.20 2 4 57.60 1,116.60
kusen lantai 4 J2 m1 7.20 2 15 216.00 1,059.00
kusen lantai 4 J3 m1 8.60 2 2 34.40 843.00
kusen lantai 4 BV m1 3.06 2 5 30.60 808.60
kusen lantai 4 GS m1 4.80 2 20 192.00 778.00
kolom K2 m1 4 4.25 17.00 586.00
kolom K3 atap kecil m1 4 4.25 17.00 569.00
kolom K3 atap besar m1 4 4.25 17.00 552.00
kolom K4 atap kecil m1 4 1.00 4.00 535.00
kolom K4 atap besar m1 4 1.00 4.00 531.00
balok B1 bagian luar m1 2 8.14 16.28 527.00
balok B2 bagian luar m1 2 70.93 141.86 510.72
balok B3 bagian luar m1 2 6.22 12.44 368.86
balok B5 bagian luar m1 2 18.18 36.36 356.42
balok B5 posisi balkon m1 2 10.75 21.50 320.06
balok lisplank m1 1 64.23 64.23 298.56
lisplank beton m1 2 64.23 128.47 234.33
plat leufel m1 2 52.93 105.86 105.86
1 2 3 4 5 6 7 8 9 10 11
V PEKERJAAN KUSEN, DAUN PINTU, DAN JENDELA
1 Pek. pasang pintu type P1 terdiri dari : kusen aluminium 4" powder coating, daun
pintu wpc uk. 210 x 72 cm finishing melamin, engsel pintu steinless, handle pintu,
kunci slinder. 4.00 unit 4 4.00 4.00
2 Pek. pasang pintu type P2 terdiri dari : kusen aluminium 4" powder coating, daun
pintu wpc uk. 210 x 82 cm finishing melamin, engsel pintu steinless, handle pintu,
kunci slinder, kaca bening tb. 5 mm. 1.00 unit 1 1.00 1.00
3 Pek. pasang pintu type P3 terdiri dari : kusen aluminium 4" powder coating, daun
pintu wpc uk. 210 x 80 cm finishing melamin, engsel pintu steinless, grendel pintu
tanam, handle pintu, kunci slinder. 2.00 unit 2 2.00 2.00
4 Pek. pasang pintu type P4 terdiri dari : kusen aluminium 4" powder coating, daun
pintu wpc uk. 210 x 82 cm finishing melamin, daun pintu wpc uk. 210 x 42 cm
finishing melamin, engsel pintu steinless, grendel pintu tanam, pull handle pintu,
kunci slinder, kaca bening tb. 5 mm. 3.00 unit 3 3.00 3.00
5 Pek. pasang jendela type J1 terdiri dari : kusen aluminium 4" powder coating,
kaca bening tb. 5 mm 4.00 unit 4 4.00 4.00
6 Pek. pasang jendela type J2 terdiri dari : kusen aluminium 4" powder coating,
slimar jendela aluminium powder coating, casement, rambuncis, kaca bening tb. 5
mm 15.00 unit 15 15.00 15.00
7 Pek. pasang jendela type J3 terdiri dari : kusen aluminium 4" powder coating,
slimar jendela aluminium powder coating, casement, rambuncis, kaca bening tb. 5
mm 2.00 unit 2 2.00 2.00
8 Pek. pasang bovenlight type BV terdiri dari : kusen aluminium 4" powder coating,
kaca buram tb. 5 mm 5.00 unit 5 5.00 5.00
1 2 3 4 5 6 7 8 9 10 11
VI PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1 Pek. pasang kuda-kuda double siku L 60.60.6 1,991.17 kg 0.00 1,991.17
Atap kecil kuda" full kg 5.42 23.83 5 645.81 1,991.17
Atap kecil jurai kg 5.42 11.92 4 258.33 1,345.35
Atap besar kuda" full kg 5.42 27.19 5 736.89 1,087.03
Atap besar jurai kg 5.42 16.15 4 350.14 350.14
2 Pek. pasang gording CNP 150.50.20.2,3 1,575.30 kg 0.00 1,575.30
Atap kecil kg 4.96 149.48 741.42 1,575.30
Atap besar kg 4.96 168.12 833.88 833.88
3 Pek. pasang plat landas tb. 10 mm 353.25 kg 0.00 353.25
Atap kecil kuda" full kg 0.25 0.010 7,850.00 5 98.13 353.25
Atap kecil jurai kg 0.25 0.010 7,850.00 4 78.50 255.13
Atap besar kuda" full kg 0.25 0.010 7,850.00 5 98.13 176.63
Atap besar jurai kg 0.25 0.010 7,850.00 4 78.50 78.50
4 Pek. pasang plat simpul tb. 8 mm 307.02 kg 0.00 307.02
Atap kecil kuda" full kg 0.33 0.008 7,850.00 5 103.62 307.02
Atap kecil jurai kg 0.20 0.008 7,850.00 4 49.89 203.40
Atap besar kuda" full kg 0.33 0.008 7,850.00 5 103.62 153.51
Atap besar jurai kg 0.20 0.008 7,850.00 4 49.89 49.89
5 Pek. pasang siku L 60.60.6. penanahan gording 93.66 kg 0.00 93.66
Atap kecil kuda" full kg 0.96 5.42 5 26.02 93.66
Atap kecil jurai kg 0.96 5.42 4 20.81 67.64
Atap besar kuda" full kg 0.96 5.42 5 26.02 46.83
Atap besar jurai kg 0.96 5.42 4 20.81 20.81
6 Pek. pasang penggantung gording besi beton Ø 10 mm 137.64 kg 0.00 137.64
Atap kecil kg 0.62 1.00 114 70.68 137.64
Atap besar kg 0.62 1.00 108 66.96 66.96
7 Pek. pasang ikatan angin besi beton Ø 16 mm 200.16 kg 0.00 200.16
Atap kecil kg 1.58 59.62 94.20 200.16
Atap besar kg 1.58 67.06 105.96 105.96
8 Pek. pasang mur baut penggantung gording htb 10 mm 444.00 bh 0.00 444.00
Atap kecil bh 228 228.00 444.00
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
Atap besar bh 216 216.00 216.00
9 Pek. pasang mur baut htb 12 mm 776.00 bh 0.00 776.00
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
Atap kecil kuda" full bh 56 5 280.00 776.00
Atap kecil jurai bh 27 4 108.00 496.00
Atap besar kuda" full bh 56 5 280.00 388.00
Atap besar jurai bh 27 4 108.00 108.00
10 Pek. pasang waltermoor Ø 16 mm 16.00 bh 0.00 16.00
Atap kecil bh 8 8.00 16.00
Atap besar bh 8 8.00 8.00
11 Pek. pasang angker Ø19 mm ( panjang 60 cm ) 72.00 bh 0.00 72.00
Atap kecil kuda" full bh 20 20.00 72.00
Atap kecil jurai bh 16 16.00 52.00
Atap besar kuda" full bh 20 20.00 36.00
Atap besar jurai bh 16 16.00 16.00
12 Pek. pasang usuk + reng galvalume 280.37 m2 0.00 280.37
Atap kecil (model atap trapesium) m2 16.60 3.40 2 112.88 280.37
Atap kecil (model atap segitiga) m2 2.20 3.40 2 14.96 167.49
Atap besar (model atap trapesium) m2 18.49 3.60 2 133.09 152.53
Atap besar (model atap segitiga) m2 2.70 3.60 2 19.44 19.44
13 Pek. pasang penutup atap genteng keramik glazur 280.37 m2 0.00 280.37
1 2 3 4 5 6 7 8 9 10 11
1 Pek. pasang gypsumboard tb. 9 mm + rangka hollow galvalume □40.40.0,6 mm 326.87 m2 0.00 326.87
termasuk penggantung hollow galvalume □ 40.40.0,6 mm.
1 2 3 4 5 6 7 8 9 10 11
VIII PEKERJAAN PENGECATAN
1 Pek. cat dinding interior 580.12 m2 0.00 580.12
acian dinding bagian dalam m2 704.15 704.15 580.12
kolom K2 m2 0.80 4.25 1 3.40 (124.03)
kolom K3 atap kecil m2 1.00 4.25 12 51.00 (127.43)
kolom K3 atap besar m2 1.00 4.25 12 51.00 (178.43)
kurangi luasan kusen total m2 (100.59) (100.59) (229.43)
kurangi luasan keramik dinding m2 (115.68) (115.68) (128.84)
kurangi luasan plint keramik m2 (131.57) 0.10 (13.16) (13.16)
2 Pek. cat dinding weatheshield (exterior) 984.48 m2 0.00 984.48
acian dinding bagian luar m2 704.15 704.15 984.48
kolom K2 m2 0.00 280.32
kolom K3 atap kecil m2 0.80 4.25 1 3.40 280.32
kolom K3 atap besar m2 1.00 4.25 12 51.00 276.92
kolom K4 atap kecil m2 1.00 4.25 12 51.00 225.92
kolom K4 atap besar m2 0.70 1.00 14 9.80 174.92
balok B1 bagian luar m2 0.70 1.00 14 9.80 165.12
balok B2 bagian luar m2 1.00 8.14 8.14 155.32
balok B3 bagian luar m2 0.55 70.93 39.01 147.18
balok B5 bagian luar m2 0.55 6.22 3.42 108.17
balok B5 posisi balkon m2 0.40 18.18 7.27 104.75
plat leufel m2 63.53 63.53 97.48
lisplank beton m2 115.62 115.62 33.95
balok lisplank m2 12.85 12.85 (81.67)
kurangi luasan kusen total m2 (94.52) (94.52) (94.52)
3 Pek. cat plafond 326.87 m2 326.87 326.87 326.87
4 Pek. cat list plafond 27.99 m2 0.10 279.93 27.99 27.99
5 Pek. waterproofing 220.69 m2 0.00 220.69
Plat atap beton m2 184.65 184.65 220.69
Plat leufel m2 0.30 52.94 15.88 36.04
KM lantai 4 m2 2.47 8.16 20.16 20.16
6 Pek. meni besi 572.09 m2 0.00 572.09
gording cnp m2 0.58 317.60 184.21 572.09
kuda" double siku m2 367.37 367.37 387.88
siku penahan gording m2 17.28 0.24 4.15 20.51
plat landas m2 4.50 4.50 16.36
plat simpul m2 4.89 4.89 11.86
penggantung gording m2 0.03 222.00 6.97 6.97
Panjang/Lua Panjang
No. JENIS PEKERJAAN VOLUME SAT Lebar Berat /Tinggi Banyak JUMLAH TOTAL
s Total
1 2 3 4 5 6 7 8 9 10 11
IX PEKERJAAN INSTALASI LISTRIK
1 Pek. pasang box panel listrik 1.00 unit 1 1.00 1.00
2 Pek. pasang instalasi listrik dan titik stop kontak 17.00 titik 17 17.00 17.00
3 Pek. pasang instalasi listrik dan titik stop kontak AC 8.00 titik 8 8.00 8.00
4 Pek. pasang instalasi listrik dan titik lampu 33.00 bh 33 33.00 33.00
5 Pek. pasang saklar tunggal 2.00 bh 2 2.00 2.00
6 Pek. pasang saklar ganda 5.00 bh 5 5.00 5.00
7 Pek. pasang lampu RMI 1x38 watt + armatur RMI full mirror 15.00 bh 15 15.00 15.00
8 Pek. pasang lampu SL 13 watt ex. Tornado 7.00 bh 7 7.00 7.00
9 Pek. pasang lampu SL 18 watt ex. Tornado 11.00 bh 11 11.00 11.00
1 2 3 4 5 6 7 8 9 10 11
6 Pek. pasang closed duduk mono blok lengkap dengan aksesoris terpasang 4.00 bh 4 4.00 4.00
7 Pek. pasang wastafel lengkap dengan aksesories terpasang 2.00 bh 2 2.00 2.00
8 Pek. pasang shower spray / jet washer 4.00 bh 4 4.00 4.00
9 Pek. pasang kran wasatafel steinless 2.00 bh 2 2.00 2.00
10 Pek. pasang kran air steinless 4.00 bh 4 4.00 4.00
11 Pek. pasang floor drain steinless 6.00 bh 6 6.00 6.00
12 Pek. pasang roof drain steinless 16.00 bh 16 16.00 16.00
13 Pek. pasang tempat sabun porselen warna putih 4.00 bh 4 4.00 4.00
14 Pek. pasang profil tank kap. 1100 liter termasuk pelampung otomatis 1.00 bh 1 1.00 1.00