PROPORSI CAMPURAN MENGGUNAKAN BAKET EXCAVATOR

PROPORSI 1-m3 MIX 1 MIX 2

Bahan Air permukaan Berat Aktual (kg) Berat Aktual (kg) Keterangan
Kondisi SSD Terkoreksi
% Kg PER 5.0 M3 PER 6.0 M3
Data Tes Material :
Mutu beton fc'15 SPGR Berat Isi
Semen 308 308 1540 1848 3.130 1.360
Pasir 722 0.59 4.26 726 3631 4358 2.550 1.355
Kerikil (10-20mm) 1009 0.86 8.68 1018 5088 6106 2.671 1.402
Air 185 -12.94 172 860 1032 1.000 1.000
Admixture CONSOL SG 0.77 0.77 3.85 4.62
CONCRETE VOLUME PER 5.0 M3 (CEMENT = 1540 KG) CONCRETE VOLUME PER 6.0 M3 (CEMENT = 1848 KG)
BERAT ISI UKURAN BUCKED EXCAVATOR
MATERIAL T/M³
Berat Aktual Volume VOLUME BUCKED (m³) Berat aktual VOLUME BUCKED (m³)
Sak ( Jumlah PER ZAK TOTAL Volume (m³) Sak Jumlah PER ZAK TOTAL
Kg (m³) Kg
Kg ) Baket ( Kg ) BUCKED ( Kg ) Baket ( Kg ) BUCKED
SEMEN 1.360 1540 1.13 50 31 ZAK 50 31 ZAK 1848 1.36 50 37 ZAK 50 37.0 ZAK
PASIR 1.355 3631 2.68 0.65 4.1 0.65 4.1 4358 3.22 0.65 4.9 0.65 4.9
AGG KASAR (10-20mm) 1.402 5088 3.63 0.65 5.6 0.65 5.6 6106 4.36 0.65 6.7 0.65 6.7
AIR 1.000 860 860 Ltr 860.31 1032 1032 Ltr 1032 Ltr
ADMIXTURE CONSOL N10 MB 3.3 3.3 Ltr 3.29 Ltr 3.9 3.9 Ltr 3.95 Ltr
Analisa Harga Satuan Pekerjaan
Mutu Beton fc.15 Qty. Sat. Harga Sat.

Semen 308.00 kg 1,700


Air 172.00 kg 150
Kerikil 0.73 m3 550,000
Pasir 0.54 m3 550,000
Admixtur 0.77 kg 35,000
Jumlah
Faktor Kehilangan Bahan
Provit & Margin
Total Biaya
Volume Beton Area B.Plant m3 10.00 cm
Volume untuk oprit 10.00 cm
Jumlah m3 m3
Biaya Pengecoran 52.00 m3 1,671,210.18
Upah Kerja & Bahan 5.00 OH 333,333
Biaya Alat Eksavator 3.00 H 2,500,000
Total Biaya Keseluruhan
erjaan
Jumlah Harga

523,600
25,800
399,358
294,686
26,950
1,270,394
50,816
350,000
1,671,210.18
32
20
52
86,902,930
5,000,000
7,500,000
99,402,930