TOTAL PEKERJAAN BORED PILE GEDUNG PARKIR TERMINAL UTAMA TERMINAL SELATAN
NO URAIAN
SAT Vol harga sat. jumlah Vol harga sat. jumlah Vol harga sat. jumlah Vol harga sat. jumlah
B UPAH FABRIKASI
1 Upah pembesian 1500 kg 2,397,759 2 3,596,639 788,000 2 1,182,000 1,131,682 2 1,697,523 478,077 2 717,116
2 Upah pengecoran 160000 m3 15,198 160 2,431,731 2,500 160 400,000 9,071 160 1,451,434 3,627 160 580,297
3 Upah buang tanah disposa100000 m3 19,464 100 1,946,357 4,260 100 426,000 10,670 100 1,067,000 4,534 100 453,357
C MATERIAL
1 Besi U40 9000 kg 2,469,692 9 22,227,227 811,640 9 7,304,760 1,165,633 9 10,490,693 492,419 9 4,431,774
2 Beton fc' 35 non FA 980000 m3 15,958 980 15,639,068 2,625 980 2,572,500 9,525 980 9,334,532 3,808 980 3,732,036
TOTAL PEKERJAAN BORED PILE GEDUNG PARKIR TERMINAL UTAMA TERMINAL SELATAN
NO URAIAN
SAT Vol harga sat. jumlah Vol harga sat. jumlah Vol harga sat. jumlah Vol harga sat. jumlah
B UPAH FABRIKASI
1 Upah pembesian kg 2,397,759 1,500 3,596,638,656 788,000 1,500 1,182,000,000 1,131,682 1,500 1,697,523,097 478,077 1,500 717,115,558
2 Upah pengecoran m3 15,198 160,000 2,431,730,743 2,500 160,000 400,000,000 9,071 160,000 1,451,433,600 3,627 160,000 580,297,143
3 Upah buang tanah disposal m3 19,464 100,000 1,946,357,143 4,260 100,000 426,000,000 10,670 100,000 1,067,000,000 4,534 100,000 453,357,143
C MATERIAL
1 Besi U40 kg 2,469,692 9,000 22,227,226,892 811,640 9,000 7,304,760,000 1,165,633 9,000 10,490,692,741 492,419 9,000 4,431,774,151
2 Beton fc' 35 non FA m3 15,958 980,000 15,639,068,340 2,625 980,000 2,572,500,000 9,525 980,000 9,334,532,340 3,808 980,000 3,732,036,000
TOTAL PEKERJAAN BORED PILE GEDUNG PARKIR TERMINAL UTAMA TERMINAL SELATAN
NO URAIAN
SAT Vol harga sat. jumlah Vol harga sat. jumlah Vol harga sat. jumlah Vol harga sat. jumlah
B UPAH FABRIKASI
1 Upah pembesian kg 2,397,759 1,500 3,596,638,656 788,000 1,500 1,182,000,000 1,131,682 1,500 1,697,523,097 478,077 1,500 717,115,558
2 Upah pengecoran m3 15,380 160,000 2,460,745,600 2,500 160,000 400,000,000 9,071 160,000 1,451,433,600 3,808 160,000 609,312,000
3 Upah buang tanah disposal m3 19,690 100,000 1,969,025,000 4,260 100,000 426,000,000 10,670 100,000 1,067,000,000 4,760 100,000 476,025,000
C MATERIAL
1 Besi U40 kg 2,471,585 9,000 22,244,265,856 811,640 9,000 7,304,760,000 1,165,633 9,000 10,490,692,741 494,313 9,000 4,448,813,115
2 Beton fc' 35 non FA m3 16,149 980,000 15,825,670,140 2,625 980,000 2,572,500,000 9,525 980,000 9,334,532,340 3,999 980,000 3,918,637,800
B UPAH FABRIKASI
1 Upah pembesian kg 1,814,198 1,500 2,721,296,335
2 Upah pengecoran m3 11,607 160,000 1,857,042,240
3 Upah buang tanah disposal m3 15,643 100,000 1,564,314,250
C MATERIAL
1 Besi U40 kg 1,868,623 9,000 16,817,611,353
2 Beton fc' 35 non FA m3 12,187 980,000 11,943,102,906
D TEST
1 CSL ls 1 180,000,000 180,000,000
2 PDA TEST ls 1 15,000,000 15,000,000
Catatan :
̴◊ Harga sudah termasuk PPN 10%
̴◊ Harga upah besi & beton proyeksi DBG
̴◊ Harga material besi & beton proyeksi DBG
Menyetujui,
DEVIE NUR CAHAYA
Manager Proyek
1 180,000,000 180,000,000 -
1 15,000,000 15,000,000 -
15,636,510,000 20,270,488,965
1,563,651,000 2,027,048,897
17,200,161,000 22,297,537,862
Catatan : Catatan :
̴◊ Harga sudah termasuk PPN 10% ̴◊ Harga sudah termasuk PPN 10%
̴◊ Jumlah mesin bored 1 unit ̴◊ Mesin bored pile estimasi 6 unit
̴◊ Vol & Harga satuan menggunakan Ri DBG ̴◊ Vol. mggunkn gmbr optimasi DED 2 Sept.
̴◊ Harga upah besi & beton proyeksi DBG ̴◊ Harga satuan menggunakan harga DBG
̴◊ Harga material besi & beton proyeksi DBG ̴◊ Asumsi bore 50% tanah 50% tanah batu
TERMINAL SELATAN
Vol harga sat. jumlah
3 135,000,000 405,000,000
3 315,000,000 945,000,000
1,036 525,000 543,637,500
1,036 1,750,000 1,812,125,000
-
-
15,224,900,619
1,522,490,062
16,747,390,681
Catatan :
̴◊ Harga sudah termasuk PPN 10%
̴◊ Mesin bored pile 3 unit
̴◊ Vol. mggunkn gmbr optimasi DED 2 Sept.
̴◊ Harga satuan menggunakan harga DBG
̴◊ Asumsi bore 50% tanah 50% tanah batu