RENCANA ANGGARAN BIAYA (RAB)

PROGRAM : PENGELOLAAN PENDIDIKAN


KEGIATAN : PENGELOLAAN PENDIDIKAN KHUSUS
SUB KEGIATAN : PEMBANGUNAN RUNG GURU/TU/PIMPINAN
PEKERJAAN : PEMBANGUNAN RUANG TATA USAHA SLB AR-RIZKY PAJO
LOKASI : JL. LINTAS JAMBU, JAMBU, KEC. PAJO, KABUPATEN DOMPU-NTB
TAHUN ANGGARAN : 2023

HARGA SATUAN JUMLAH HARGA TOTAL RENCANA PENDANAAN


No. JENIS PEKERJAAN VOLUME SAT NOMOR UPAH BAHAN UPAH BAHAN HARGA DAK FISIK SWADAYA
ANALISA (Rp) (Rp) (Rp) (Rp) (Rp) (Rp.) (Rp.)
1 2 4 3 5 6 7 8 9 10 11 12

I BANGUNAN UTAMA 1 RUANG KELAS KHUSUS ( 1 LOKAL )


I.A PEKERJAAN PERSIAPAN 112.500,00 363.500,00 476.000,00 476.000,00 -
1 Pengukuran /Uitzet & Pemasangan Bouplank 5,00 m' A.2.2.1.4 22.500,00 72.700,00 112.500,00 363.500,00 476.000,00 476.000,00

I.B PEKERJAAN TANAH, PASIR, DAN PONDASI 2.380.361,33 3.482.657,80 5.863.019,13 5.863.019,13 -
1 Galian tanah pondasi 10,96 m3 A.2.3.1.1 75.000,00 - 821.625,00 - 821.625,00 821.625,00
2 Urug pasir bawah pondasi, t=10 cm 1,41 m3 A.2.3.1.11 30.000,00 180.000,00 42.255,00 253.530,00 295.785,00 295.785,00
3 Urug kembali 3,65 m3 A.2.3.1.9 25.000,00 - 91.291,67 - 91.291,67 91.291,67
4 Urugan pasir bawah lantai, t=5cm 1,26 m3 A.2.3.1.11 30.000,00 180.000,00 37.800,00 226.800,00 264.600,00 264.600,00
5 Urugan tanah peninggian lantai 2,53 m3 A.2.3.1.11.B 50.000,00 99.000,00 126.441,67 250.354,50 376.796,17 376.796,17
6 Pas. Batu kosong (anstamping) 2,07 m3 A.3.2.1.9 124.800,00 289.200,00 258.648,00 599.367,00 858.015,00 858.015,00
7 Pas. Pondasi batu kali 1Pc : 5 Ps 4,18 m3 A.3.2.1.3 240.000,00 515.440,00 1.002.300,00 2.152.606,30 3.154.906,30 3.154.906,30

I.C PEKERJAAN STUKTUR BETON 3.146.147,43 7.892.116,70 11.038.264,13 11.038.264,13 -


1 Beton Sloof 15/20 koef. satuan 0,31 M3
a. Begisting Sloof (2x Pakai) 13,3333 m2/1m3 4,16 m2 A.4.1.1.21.A 84.500,00 94.000,00 351.520,00 391.040,00 742.560,00 742.560,00
b. Besi Beton Polos 194,36 Kg/1m3 60,64 Kg A.4.1.1.17 1.540,00 15.435,00 93.385,24 935.974,79 1.029.360,03 1.029.360,03
c. Beton f'c = 19.3 Mpa (K225) 0,97524 m3/1m3 0,30 m3 A.4.1.1.7. 198.000,00 979.525,71 60.246,49 298.045,37 358.291,86 358.291,86
2 Beton Sloof 13/20 koef. satuan 0,12 M3 -
a. Begisting Sloof (2x Pakai) 15,3846 m2/1m3 1,92 m2 A.4.1.1.21.A 84.500,00 94.000,00 162.240,00 180.480,00 342.720,00 342.720,00
b. Besi Beton Polos 180,14 Kg/1m3 22,48 Kg A.4.1.1.17 1.540,00 15.435,00 34.622,36 347.010,42 381.632,78 381.632,78
c. Beton f'c = 19.3 Mpa (K225) 0,97705 m3/1m3 0,12 m3 A.4.1.1.7. 198.000,00 979.525,71 24.143,34 119.439,49 143.582,83 143.582,83
3 Beton Kolom K-1 (15x20) koef. satuan 0,23 M3 -
a. Begisting Kolom (2x Pakai) 23,3333 m2/1m3 5,29 m2 A.4.1.1.22.A 107.250,00 147.362,50 567.567,00 779.842,35 1.347.409,35 1.347.409,35
b. Besi Beton Polos 194,36 Kg/1m3 44,08 Kg A.4.1.1.17 1.540,00 15.435,00 67.883,89 680.381,67 748.265,56 748.265,56
c. Beton f'c = 19.3 Mpa (K225) 0,97524 m3/1m3 0,22 m3 A.4.1.1.7. 198.000,00 979.525,71 43.794,56 216.656,06 260.450,62 260.450,62
4 Beton Kolom K-2 (15x15) koef. satuan 0,08 M3 -
a. Begisting Kolom (2x Pakai) 26,6667 m2/1m3 2,18 m2 A.4.1.1.22.A 107.250,00 147.362,50 234.234,00 321.839,70 556.073,70 556.073,70
b. Besi Beton Polos 194,36 Kg/1m3 15,92 Kg A.4.1.1.17 1.540,00 15.435,00 24.513,63 245.693,38 270.207,01 270.207,01
c. Beton f'c = 19.3 Mpa (K225) 0,97524 m3/1m3 0,08 m3 A.4.1.1.7. 198.000,00 979.525,71 15.814,70 78.236,91 94.051,61 94.051,61
5 Balok Gantung (BG-13/20) koef. satuan 0,09 M3 - -
a. Begisting Balok (2x Pakai) 10,7692 m2/1m3 0,92 m2 A.4.1.1.23 107.250,00 274.525,00 99.099,00 253.661,10 352.760,10 352.760,10
b. Besi Beton Polos 169,30 Kg/1m3 14,53 Kg A.4.1.1.17 1.540,00 15.435,00 22.369,34 224.201,77 246.571,10 246.571,10
HARGA SATUAN JUMLAH HARGA TOTAL RENCANA PENDANAAN
No. JENIS PEKERJAAN VOLUME SAT NOMOR UPAH BAHAN UPAH BAHAN HARGA DAK FISIK SWADAYA
ANALISA (Rp) (Rp) (Rp) (Rp) (Rp) (Rp.) (Rp.)
1 2 4 3 5 6 7 8 9 10 11 12
c. Beton f'c = 19.3 Mpa (K225) 0,97843 m3/1m3 0,08 m3 A.4.1.1.7. 198.000,00 979.525,71 16.622,02 82.230,80 98.852,83 98.852,83
6 Kolom praktis 11/11 9,80 m' A.A.4.1.1.35 25.300,00 72.470,00 247.940,00 710.206,00 958.146,00 958.146,00
7 Ring praktis, dan Gewel 10/15 20,85 m' A.4.1.1.36 41.745,00 78.345,00 870.383,25 1.633.493,25 2.503.876,50 2.503.876,50
8 Balok Latei 10/15 5,03 m' A.4.1.1.36 41.745,00 78.345,00 209.768,63 393.683,63 603.452,25 603.452,25

I.D PEKERJAAN PASANGAN DAN PLESTERAN 8.088.533,10 5.165.175,64 13.253.708,74 13.253.708,74 -


1 Pas. tembok bata trasram camp. 1pc : 3 ps 5,17 m2 A.4.4.1.8 42.000,00 97.692,80 217.140,00 505.071,78 722.211,78 722.211,78
2 Pas. Dinding tebal 1/2 bata, camp. 1Pc : 5 ps 35,22 m2 A.4.4.1.10 42.000,00 91.814,20 1.479.389,10 3.234.022,06 4.713.411,16 4.713.411,16
3 Plesteran dinding bata trasraam camp. 1pc : 3 ps 10,34 m2 A.4.4.2.3 48.000,00 15.222,44 496.320,00 157.400,03 653.720,03 653.720,03
4 Plesteran Beton (Balok & Kolom, camp. 1pc : 3 ps) 11,33 m2 A.4.4.2.3 48.000,00 15.222,44 543.936,00 172.500,69 716.436,69 716.436,69
5 Plesteran Dinding bata, camp. 1pc : 5 ps 62,76 m2 A.4.4.2.5 48.000,00 12.014,96 3.012.520,80 754.069,10 3.766.589,90 3.766.589,90
6 Acian (dinding & Beton) 73,10 m2 A.4.4.2.27 32.000,00 4.680,00 2.339.227,20 342.111,98 2.681.339,18 2.681.339,18

I.E PEKERJAAN RANGKA KAP PENUTUP ATAP & PLAFON 5.806.488,45 8.304.780,65 14.111.269,10 14.111.269,10 -
1 Rangka Atap Baja Ringan 27,00 m2 A.4.2.1.24 76.250,00 142.482,80 2.058.750,00 3.847.035,60 5.905.785,60 5.905.785,60
2 Penutup Atap Genteng Metal (Pasiran) 0.25 mm 33,18 m2 A.4.5.2.32.A 32.500,00 70.753,19 1.078.350,00 2.347.591,00 3.425.941,00 3.425.941,00
3 Pekerjaan Lisplank (Kalsiplank Serat Jati) 16,80 m' A.4.6.1.22.A 35.000,00 12.960,00 588.000,00 217.728,00 805.728,00 805.728,00
4 Pekerjaan Nok Atap Genteng metal (pasiran) 3,50 m' A.4.5.2.40.A 43.750,00 43.456,67 153.125,00 152.098,33 305.223,33 305.223,33
5 Rangka Plafon metal Hollow ( modul 60x60 cm) 19,47 m2 A.4.2.1.21. 78.750,00 50.000,00 1.532.878,20 973.256,00 2.506.134,20 2.506.134,20
6 Plafon Givsum 9,0 mm (dalam ruangan) 24,33 m2 A.4.5.1.7.A 16.250,00 31.526,00 395.385,25 767.071,72 1.162.456,97 1.162.456,97

I.F PEKERJAAN KUSEN DAN DAUN PINTU 1.848.064,70 5.205.352,66 7.053.417,36 7.053.417,36 -
1 Kusen Pintu Alumunium 4" (Coklat ) 16,50 m' A.4.2.1.11 9.675,00 137.807,00 159.637,50 2.273.815,50 2.433.453,00 2.433.453,00
2 Roster Beton 18 x 28 cm 10,00 bh' Ls 32.000,00 - 320.000,00 320.000,00 320.000,00
3 Daun Pintu Panel kayu Klas II 2,73 m2 A.4.6.1.5 475.000,00 269.000,00 1.296.750,00 734.370,00 2.031.120,00 2.031.120,00
4 Rangka Jendela (Ram) alumunium 1,20 m2 A.4.2.1.13 19.125,00 259.220,00 22.950,00 311.064,00 334.014,00 334.014,00
5 Kunci tanam 1,00 bh A.4.6.2.2 63.500,00 113.925,00 63.500,00 113.925,00 177.425,00 177.425,00
6 Engsel Pintu 3,00 psg A.4.6.2.5 20.250,00 39.600,00 60.750,00 118.800,00 179.550,00 179.550,00
7 Hak angin (siku) 4,00 bh A.4.6.2.6.B 13.500,00 16.500,00 54.000,00 66.000,00 120.000,00 120.000,00
8 Grencel Pintu (tanam) /Expanyolet 1,00 bh A.4.6.2.11.A 54.000,00 168.000,00 54.000,00 168.000,00 222.000,00 222.000,00
9 Handle Pintu Dobel (handle C) 2,00 Psg Ls 15.000,00 150.000,00 30.000,00 300.000,00 330.000,00 330.000,00
10 Grendel jendela 2,00 bh A.4.6.2.7 20.250,00 14.400,00 40.500,00 28.800,00 69.300,00 69.300,00
11 Engsel jendela 2,00 psg A.4.6.2.6 13.500,00 20.000,00 27.000,00 40.000,00 67.000,00 67.000,00
12 Roster Beton 20 x 20 cm 14,00 bh Ls - 26.000,00 - 364.000,00 364.000,00 364.000,00
13 Kaca mati 5 mm (bening) 1,92 m2 A.4.6.2.17 20.250,00 190.450,00 38.977,20 366.578,16 405.555,36 405.555,36

I.G PEKERJAAN LANTAI, PELAPIS DINDING 2.096.468,00 3.808.378,89 5.904.846,89 5.904.846,89 -


1 Pas. Lantai Ubin keramik ( 40 x 40 cm) 23,38 m2 A.4.4.3.4 40.000,00 117.212,00 935.396,00 2.740.990,90 3.676.386,90 3.676.386,90
2 Plin keramik Lantai 10x40 16,08 m' A.4.4.3.39 19.800,00 13.441,60 318.384,00 216.140,93 534.524,93 534.524,93
3 Pas. Dinding keramik ( 25 x 40 cm) 7,85 m2 A.4.4.3.54.A 102.000,00 104.135,60 801.108,00 817.881,00 1.618.989,00 1.618.989,00
4 Plin keramik Dinding 10x25 2,10 m' A.4.4.3.40.A 19.800,00 15.888,60 41.580,00 33.366,06 74.946,06 74.946,06
HARGA SATUAN JUMLAH HARGA TOTAL RENCANA PENDANAAN
No. JENIS PEKERJAAN VOLUME SAT NOMOR UPAH BAHAN UPAH BAHAN HARGA DAK FISIK SWADAYA
ANALISA (Rp) (Rp) (Rp) (Rp) (Rp) (Rp.) (Rp.)
1 2 4 3 5 6 7 8 9 10 11 12
I.H PEKERJAAN INSTALASI LISTRIK 151.000,00 1.044.850,00 1.195.850,00 1.195.850,00 -
1 Instalasi Penerangan dan Stop Kontak 3,00 bh A.8.4.6.2.a 33.000,00 231.100,00 99.000,00 693.300,00 792.300,00 792.300,00
2 Titik Lampu + Lampu SL 18 watt bh Ls - 75.000,00 - - - -
3 Titik Lampu + Lampu SL 8 watt 1,00 bh Ls - 65.000,00 - 65.000,00 65.000,00 65.000,00
4 Lampu RMI 2 X 18 Watt 1,00 Set Ls - 241.500,00 - 241.500,00 241.500,00 241.500,00
5 Stop Kontak 1,00 bh A.6.List.2 26.000,00 24.650,00 26.000,00 24.650,00 50.650,00 50.650,00
6 Saklar tunggal 1,00 bh A.6.List.3 26.000,00 20.400,00 26.000,00 20.400,00 46.400,00 46.400,00

I.I PEKERJAAN PENGECATAN 835.440,91 2.064.196,15 2.899.637,06 2.899.637,06 -


1 Cat tembok 54,83 m2 A.4.7.1.10. 9.560,00 23.313,00 524.133,09 1.278.150,09 1.802.283,18 1.802.283,18
2 Cat plafond 22,04 m2 A.4.7.1.10. 9.560,00 23.313,00 210.743,01 513.917,56 724.660,58 724.660,58
3 Cat Lisplank dan Pondasi 3,36 m2 A.4.7.1.23 16.800,00 15.300,00 56.448,00 51.408,00 107.856,00 107.856,00
4 Cat Kayu (daun Pintu) 5,46 m2 A.4.7.1.4. 8.080,00 40.425,00 44.116,80 220.720,50 264.837,30 264.837,30

II PEKERJAAN AKSESIBILITAS
II.A PEKERJAAN HAND RAILLING 40.068,25 402.572,74 442.640,99 442.640,99 -
1 Pekerjaan Handrailling
1.a. Pek. Handrail (steinless) 2" 1,96 kg A.4.2.1.1.A 13.500,00 59.509,41 26.449,20 116.590,83 143.040,03 143.040,03
1.b. Pek. Pengelasan 20,95 cm A.4.2.1.5 650,00 6.585,50 13.619,05 137.981,90 151.600,95 151.600,95
1.c. Ring SS 2" 4,00 bh Ls - 7.000,00 - 28.000,00 28.000,00 28.000,00
1.d. Elbow SS" 4,00 bh Ls - 25.000,00 - 100.000,00 100.000,00 100.000,00
1.e. Dinabolt 8,00 bh Ls - 2.500,00 - 20.000,00 20.000,00 20.000,00

II.B PEKREJAAN LANTAI 191.520,00 1.205.445,09 1.396.965,09 1.396.965,09 -


1 Pekerjaan koral Sikat 1,99 m2 Ls - 195.000,00 - 387.075,00 387.075,00 387.075,00
2 Pekerjaan tegel Tunanetra (Guiding blok) 30x30 1,71 m2' A.4.4.3.38.A 112.000,00 478.579,00 191.520,00 818.370,09 1.009.890,09 1.009.890,09