POS SECURITY
Proyek : Pembangunan Pabrik PP Board
Lokasi : Purwakarta
Owner : PT. Kishi Board Indonesia
Kontraktor : CV. Hadi Karya Konstruksi
A PEKERJAAN PONDASI
Pekerjaan Bowplank, Tanah & Pasangan Batu Kali
1 Galian Tanah Ex.Dipadatkan Dalam Max 1,50M/m3 11.76 m3 - 238,633.33 1,371.75 240,005.08 - 2,806,328.00 16,131.78 2,822,459.78
2 Pemadatan Tanah Pondasi/m2 (dgn Timbrisan Manual) 7.84 m2 - 7,333.33 2,500.00 9,833.33 - 57,493.33 19,600.00 77,093.33
3 Urugan Pasir Urug/m3 0.08 m3 - 344,766.50 66,666.67 411,433.17 - 27,029.69 5,226.67 32,256.36
4 Besi Angkur Sloof dia 10mm50cm/bh Polos 20.00 bh - - - 163,775.23 - - - 3,275,504.59
Pekerjaan Pondasi Plat Setempat
5 Bekisting Pond.Plat Setempat/m2 2xpakai dgn Papan 2/20 11.76 m2 108,745.21 56,500.00 - 165,245.21 1,278,843.63 664,440.00 - 1,943,283.63
6 Pembesian Ulir/kg 254.68 kg 23,763.28 7,533.33 500,000.00 531,296.62 6,052,123.09 1,918,617.96 127,341,900.00 135,312,641.05
7 Beton 1:3:5/m3,dgn Koral 1.74 m3 1,529,958.50 256,888.89 181,250.00 1,968,097.39 2,662,127.79 446,986.67 315,375.00 3,424,489.46
Pekerjaan Sloof
8 Bekisting Sloof/m2 2xpakai dgn Papan 2/20 5.28 m2 660,247.97 75,333.33 - 735,581.30 3,486,109.26 397,760.00 - 3,883,869.26
9 Pembesian Polos/kg 253.22 kg 23,342.61 7,533.33 500,000.00 530,875.95 5,910,818.67 1,907,591.42 126,610,050.00 134,428,460.09
10 Beton 1:3:5/m3,dgn Koral 1.73 m3 1,529,958.50 256,888.89 181,250.00 1,968,097.39 2,646,828.21 444,417.78 313,562.50 3,404,808.48
B PEKERJAAN STRUKTUR
Kolom K1
11 Beton 1:2:3/m3,dgn Seplit 1.31 m3 1,763,156.00 256,888.89 181,250.00 2,201,294.89 2,314,142.25 337,166.67 237,890.63 2,889,199.54
12 Pembesian Ulir/kg 192.11 kg 23,763.28 7,533.33 500,000.00 531,296.62 4,565,179.05 1,447,233.38 96,055,312.50 102,067,724.93
13 Bekisting Kolom/m2 2xpakai dgn Papan 2/20 21.00 m2 161,864.21 75,333.33 - 237,197.55 3,399,148.49 1,582,000.00 - 4,981,148.49
Kolom K2
14 Beton 1:2:3/m3,dgn Seplit 0.32 m3 1,763,156.00 256,888.89 181,250.00 2,201,294.89 555,394.14 80,920.00 57,093.75 693,407.89
15 Pembesian Ulir/kg 46.11 kg 23,763.28 7,533.33 500,000.00 531,296.62 1,095,642.97 347,336.01 23,053,275.00 24,496,253.98
16 Bekisting Kolom/m2 2xpakai dgn Papan 2/20 8.40 m2 161,864.21 75,333.33 - 237,197.55 1,359,659.40 632,800.00 - 1,992,459.40
Balok B1
17 Beton 1:2:3/m3,dgn Seplit 1.73 m3 1,763,156.00 256,888.89 181,250.00 2,201,294.89 3,050,259.88 444,417.78 313,562.50 3,808,240.16
18 Pembesian Ulir/kg 253.22 kg 23,763.28 7,533.33 500,000.00 531,296.62 6,017,340.77 1,907,591.42 126,610,050.00 134,534,982.19
19 Bekisting Balok/m2 2xpakai dgn Papan 2/20 5.28 m2 157,047.09 113,000.00 - 270,047.09 829,208.61 596,640.00 - 1,425,848.61
Balok B2
20 Beton 1:2:3/m3,dgn Seplit 1.73 m3 1,763,156.00 256,888.89 181,250.00 2,201,294.89 3,050,259.88 444,417.78 313,562.50 3,808,240.16
21 Pembesian Ulir/kg 253.22 kg 23,763.28 7,533.33 500,000.00 531,296.62 6,017,340.77 1,907,591.42 126,610,050.00 134,534,982.19
22 Bekisting Balok/m2 2xpakai dgn Papan 2/20 5.28 m2 157,047.09 113,000.00 - 270,047.09 829,208.61 596,640.00 - 1,425,848.61
Pelat Dak
23 Beton 1:2:3/m3,dgn Seplit 1.25 m3 1,763,156.00 256,888.89 181,250.00 2,201,294.89 2,200,418.69 320,597.33 226,200.00 2,747,216.02
24 Pembesian Ulir/kg 182.67 kg 23,763.28 7,533.33 500,000.00 531,296.62 4,340,833.11 1,376,112.19 91,334,880.00 97,051,825.30
25 Bekisting Bondek 1mm 16.00 m2 117,668.90 94,166.67 - 211,835.56 1,882,702.37 1,506,666.67 - 3,389,369.03
I PEKERJAAN PENGECATAN
23 Cat Tembok Dalam/m2 56.00 m2 6,401.50 75,333.33 12,803.00 94,537.83 358,484.00 4,218,666.67 716,968.00 5,294,118.67
22 Cat Tembok Luar/m2 65.60 m2 9,145.00 75,333.33 12,803.00 97,281.33 599,912.00 4,941,866.67 839,876.80 6,381,655.47