Harga Jumlah
NO URAIAN PEKERJAAN Volume Sat
Satuan (Rp) Satuan (Rp)
1 2 3 4 5 6
A RUMAH TYPE 27
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
IV PEKERJAAN BETON
1 Sloof 15/20
Beton K200 1.26 m3 937,125.50 1,184,432.92
Besi 189.59 kg 13,243.40 2,510,749.99
Bekisting 16.85 m2 143,047.00 2,410,628.04
2 Kolom 12/12
Beton K200 0.95 m3 937,125.50 891,453.75
Besi 142.69 kg 13,243.40 1,889,695.45
Bekisting 19.82 m2 312,576.00 6,194,631.17
X PEKERJAAN CAT