RANCANGAN ANGGARAN BIAYA ( RAB )

PEKERJAAN : Pembangunan Dapur


LOKASI : Br. Angkah Gede, Ds. Angkah, Kec. Selemadeg Barat, Tabanan
TAHUN : 2022

HARGA
JUMLAH
NO. VOLUME SATUAN
HARGA ( Rp. )
( Rp. )
1 2 3 4 5=3x4

A PEMBANGUNAN DAPUR
I PEKERJAAN PERSIAPAN
1 Pek. Bongkaran awal pembersihan site 30 m2 56,750 1,702,500

II PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi 10.78 m3 93,281 1,005,572
2 Pek. Urugan Tanah Peninggian Lantai 15.00 m3 133,438 2,001,563
3 Pek. Pondasi Batu Kali Camp. 1 pc :4 ps 5.94 m3 310,313 1,843,256
4 Pek. Pasangan Batu Kosong 1.98 m3 161,363 319,498
5 Pek. Urugan Pasir Bawah Pondasi 0.66 m3 172,313 113,726

III PEK. BETON


1 Pek. Beton Rabat
a. Beton f'c= 9,8 Mpa (K175) 4.20 m3 869,953 3,653,803
b. Besi 8k (satu lapis) 228.94 Kg 11,693 2,677,019
c. Pek. Urugan Pasir Bawah Lantai 3.36 m3 151,635 509,494

2 Pek. Beton Kolom


a. Beton f’c = 21,7 Mpa (K.250) 0.94 m3 986,873 928,154
b. Besi Ø10 129.32 Kg 14,032 1,814,549
c. Begesting 13.68 m2 228,360 3,123,965

3 Pek. Beton Sloof (20/30)


a. Beton f'c= 21,7 Mpa (K.250) 1.32 m3 986,873 1,302,673
b. Besi Ø10 181.50 Kg 14,032 2,546,735
c. Begesting 13.20 m2 168,475 2,223,870

4 Pek. Ring Balok


a. Beton f'c= 21,7 Mpa (K.250) 0.66 m3 986,873 651,336
b. Besi Ø10 94.88 Kg 14,032 1,331,248
c. Begesting 8.80 m2 231,775 2,039,620
IV PEK. DINDING DAN PLESTERAN
1 Pek. Dinding Batako 58.92 m2 99,650 5,870,894
2 Pek. Plesteran Dinding camp. 1 : 6 tebal 20mm 117.83 m2 89,259 10,517,369

V PEK. ATAP DAN PLAFOND


1 Pek. Pasang Rangka Atap Kayu 42.56 m2 45,000 1,915,200
2 Pek. Pasangan List Plank 26.40 m' 30,000 792,000
3 Pek. Pasangan Genteng Pres Mini Pejaten 80.01 m2 62,080 4,967,195
4 Pek. Pasangan Bubungan 17.28 m' 97,929 1,692,213
5 Pek. Pasangan Murda 2.00 unit 115,250 230,500
6 Pek. Pasangan Ikut Celedu 4.00 unit 122,500 490,000

IX PEK. KUSEN DAN PINTU


1 Pek. Pasang Kusen Pintu Kamper (2,1x0,9m) 2.00 unit 1,550,000 3,100,000
2 Pek. Pasangan Kusen Jendela Kamper dobel (1,5x0,95 m) 2.00 unit 1,350,000 2,700,000
3 Pek. Pasang Daun Pintu Panil Kamper (2,05x0,8m) 2.00 unit 1,450,000 2,900,000
4 Pek. Pasang Daun Jendela 3mm Kamper (1,4x0.4m) 4.00 unit 775,500 3,102,000
7 Pek. Pasang Kunci & Gagang Pintu Ex. Kunci biasa 2.00 unit 200,000 400,000
8 Pek. Pasang Engsel Pintu Ex. Solid 6.00 unit 95,000 570,000
9 Pek. Pasang Engsel & Grendel Gendela 8.00 unit 55,000 440,000
10 Pek. Pasang Kait Angin Jendela 8.00 unit 32,500 260,000

TOTAL PEKERJAAN A 69,735,952

B PEMBANGUANAN WC
I PEK. BETON

1 Pek. Ring Balok


a. Beton f'c= 21,7 Mpa (K.250) 0.42 m3 986,873 414,487
b. Besi Ø10 49.77 Kg 14,032 698,353
c. Begesting 5.60 m2 231,775 1,297,940

2 Pek. Beton Kolom


a. Beton f’c = 21,7 Mpa (K.250) 0.50 m3 986,873 497,384
b. Besi Ø10 59.72 Kg 14,032 838,023
c. Begesting 6.72 m2 228,360 1,534,579

3 Pek. Beton Sloof (20/30)


a. Beton f'c= 21,7 Mpa (K.250) 0.84 m3 986,873 828,974
b. Besi Ø10 93.87 Kg 14,032 1,317,146
c. Begesting 8.40 m2 168,475 1,415,190

II PEK. DINDING DAN PLESTERAN


1 Pek. Dinding Batako 27.06 m2 99,650 2,696,536
2 Pek. Plesteran Dinding camp. 1 : 6 tebal 20mm 54.12 m2 89,259 4,830,688
3 Pek. Acian dinding 108.24 m2 47,910 5,185,778

IV PEK. Atap
1 Pek. Pasangan Kap 15.00 m2 45,000 675,000
2 Pek. Pasangan Seng Galvalum Tebal 0.03cm 24.31 m2 272,098 6,614,693

IV PEK. LANTAI
1 Pek. Keramik Lantai20x20 Anti Slip 6.00 m2 332,109 1,992,654

IX PEK. KUSEN DAN PINTU


1 Pek. Pasang Pintu Stainless 2.00 bh 850,000 1,700,000
X PEK. SANITAIR DAN PLUMBING
1 Pek Pipa 4" AW Air Kotor Ex. Langeng 6.00 m' 109,250 655,500
2 Pek. Pas. Closet jongkok Ex. Toto 2.00 bh 350,000 700,000
3 Pek. Pas. Bak Mandi 2.00 bh 450,000 900,000
TOTAL PEKERJAAN B 34,792,926

TOTAL PEKERJAAN A + B 104,528,878


Total Harga Pekerjaan( Rp. ) 104,528,878
PPN 10% 10,452,888
Total Cost ( Rp. ) 104,528,878
Dibulatkan ( Rp. ) 104,530,000
Terbilang : Seratus Empat Juta Lima Ratus Tiga Puluh Ribu Rupiah

NOTE : Pekerjaan yang telah dihitung berdasarkan denah terakhir yang telah diberikan oleh owner, jika ada perubahan
gambar kembali maka perlu dilakukan pengecekan lagi dengan seksama. Jika harga dengan spesifikasi telah disetujui ada
perubahan lagi maka pekerjaan tersebut dapat dimasukan ke dalam pekerjaan tambah/kurang nantinya.