1 2 3
Dibuat :
Penyedia
CV. DARMA BAKTI
Drs. SA'RONI
Direktur
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
No. URAIAN PEKERJAAN SAT VOLUME
SATUAN ( Rp. ) ( Rp. )
1 2 4 5 6 7
A LANTAI BAWAH
I PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bowplank m1 7.50 91,513.00 686,347.00
2 Menurunkan atap genteng lama m2 111.30 1,265.00 140,794.00
3 Menurunkan kuda-kuda, nok & gording m3 1.91 418,000.00 798,547.00
4 Menurunkan rangka atap m2 111.30 5,115.00 569,299.00
5 Bongkar dinding bata merah m3 12.19 513,320.00 6,256,087.00
6 Pembersihan lokasi m2 135.00 12,650.00 1,707,750.00
JUMLAH 10,158,824.00
II PEKERJAAN TANAH
1 Galian Tanah m3 18.47 56,375.00 1,041,246.00
2 Booring Tanah untuk Pondasi Strauss m1 114.00 83,160.00 9,480,240.00
3 Urugan Tanah Kembali m3 9.60 16,912.00 162,355.00
4 Urugan Pasir m3 13.47 174,350.00 2,348,494.00
JUMLAH 13,032,335.00
III PEKERJAAN PONDASI BATU BELAH
1 Pas. Pondasi Batukali Camp. 1 Pc : 6 Ps m3 13.55 623,997.00 8,455,159.00
2 Pasang Aanstamping m3 7.74 326,634.00 2,528,147.00
JUMLAH 10,983,306.00
IV PEKERJAAN PASANGAN
1 Pas. Bata merah 1/2 Batu, Camp. 1 Pc : 3 Ps m2 35.96 90,688.00 3,261,140.00
2 Pas. Rollag Bata merah 1/2 Batu, Camp. 1 Pc : 3 Ps m2 44.00 90,688.00 3,990,272.00
3 Pas. Batamerah 1/2 Batu, Camp. 1 Pc : 6 Ps m2 212.82 84,385.00 17,958,815.00
JUMLAH 25,210,227.00
V PEKERJAAN PLESTERAN
1 Plesteran dinding 1 Pc : 3 Ps m2 71.92 53,175.00 3,824,346.00
2 Plesteran dinding 1 Pc : 6 Ps m2 425.64 49,488.00 21,064,072.00
3 Acian m2 497.56 30,030.00 14,941,726.00
4 Benangan m1 160.56 12,644.00 2,030,120.00
JUMLAH 41,860,264.00
VI PEKERJAAN BETON
1 Membuat Lantai Kerja m3 1.40 776,734.00 1,087,427.00
2 Membuat Poer Plat 80X80X40 ( PP2 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 2.05 950,163.00 1,947,834.00
b. Bekisting m2 10.24 75,808.00 776,273.00
c. Penulangan dengan Besi Beton Polos kg 634.42 12,537.00 7,953,723.00
3 Membuat Poer Plat 120X120X40 ( PP1 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 8.64 950,163.00 8,209,408.00
b. Bekisting m2 28.80 75,808.00 2,183,270.00
c. Penulangan dengan Besi Beton Polos kg 2,693.54 12,537.00 33,768,910.00
4 Membuat Pondasi Plat 80X150 ( Tangga/ PP3 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 0.98 950,163.00 931,159.00
b. Bekisting m2 3.15 75,808.00 238,795.00
c. Penulangan dengan Besi Beton Polos kg 70.97 12,537.00 889,750.00
5 Membuat Pondasi Strauss Ø30-300 ( PS )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 8.05 950,163.00 7,648,812.00
c. Penulangan dengan Besi Beton Polos kg 957.61 12,537.00 12,005,556.00
6 Membuat Sloof 15/20 ( S3 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.74 871,852.00 645,170.00
b. Pasang Begisting m2 9.90 61,668.00 610,513.00
c. Penulangan dengan Besi Beton Polos kg 129.57 12,537.00 1,624,419.00
7 Membuat Sloof 15/30 ( S2 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 1.64 871,852.00 1,429,837.00
b. Pasang Begisting m2 21.93 61,668.00 1,352,379.00
ee-2
1 2 4 5 6 7
c. Penulangan dengan Besi Beton Polos kg 259.34 12,537.00 3,251,345.00
8 Membuat Sloof 20/35 ( S1 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 1.41 871,852.00 1,229,311.00
b. Pasang Begisting m2 14.11 61,668.00 870,135.00
c. Penulangan dengan Besi Beton Polos kg 155.86 12,537.00 1,954,016.00
9 Membuat Kolom 12/12 ( K5 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.81 871,852.00 706,200.00
b. Pasang Begisting m2 13.44 61,668.00 828,817.00
c. Penulangan dengan Besi Beton Polos kg 200.00 12,537.00 2,507,400.00
10 Membuat Kolom 30/30 ( K2 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 2.16 950,163.00 2,052,352.00
b. Pasang Begisting m2 28.80 133,320.00 3,839,616.00
c. Penulangan dengan Besi Beton Polos kg 465.22 12,537.00 5,832,463.00
11 Membuat Kolom 30/30 ( K3 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 2.88 950,163.00 2,736,469.00
b. Pasang Begisting m2 38.40 133,320.00 5,119,488.00
c. Penulangan dengan Besi Beton Polos kg 342.47 12,537.00 4,293,546.00
12 Membuat Kolom 35/40 ( K1 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 8.40 950,163.00 7,981,369.00
b. Pasang Begisting m2 90.00 133,320.00 11,998,800.00
c. Penulangan dengan Besi Beton Polos kg 1,598.70 12,537.00 20,042,911.00
13 Membuat Balok Latay 12/20 ( BL )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.49 871,852.00 430,625.00
b. Pasang Begisting m2 10.70 137,500.00 1,471,470.00
c. Penulangan dengan Besi Beton Polos kg 104.49 12,537.00 1,310,052.00
14 Membuat Balok Gantung 15/20 ( BG1 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.14 871,852.00 122,931.00
b. Pasang Begisting m2 2.59 137,500.00 355,437.00
c. Penulangan dengan Besi Beton Polos kg 30.85 12,537.00 386,748.00
15 Membuat Balok Gantung 15/25 ( BG2 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.16 871,852.00 137,316.00
b. Pasang Begisting m2 2.89 137,500.00 397,031.00
c. Penulangan dengan Besi Beton Polos kg 34.40 12,537.00 431,292.00
16 Membuat Balok 20/25 ( B3 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 0.21 950,163.00 197,158.00
b. Pasang Bekisting untuk Balok m2 1.08 137,500.00 148,362.00
c. Penulangan dengan Besi Beton Polos kg 29.99 12,537.00 376,023.00
17 Membuat Balok 20/35 ( B2 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 5.59 950,163.00 5,313,596.00
b. Pasang Bekisting untuk Balok m2 36.75 137,500.00 5,053,042.00
c. Penulangan dengan Besi Beton Polos kg 1,014.08 12,537.00 12,713,481.00
18 Membuat Balok 35/70 ( B1 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 5.94 950,163.00 5,642,828.00
b. Pasang Bekisting untuk Balok m2 28.12 137,500.00 3,866,280.00
c. Penulangan dengan Besi Beton Polos kg 779.81 12,537.00 9,776,523.00
19 Membuat Balok 30/30 ( B4 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 0.24 950,163.00 230,889.00
b. Pasang Bekisting untuk Balok m2 0.97 137,500.00 133,650.00
c. Penulangan dengan Besi Beton Polos kg 27.14 12,537.00 340,250.00
20 Membuat Balok Tangga 15/20 ( BT )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 0.39 950,163.00 366,002.00
b. Pasang Bekisting m2 7.06 137,500.00 971,025.00
c. Penulangan dengan Besi Beton Polos kg 83.43 12,537.00 1,045,998.00
21 Membuat Plat Dack Tbl. 12 Cm
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 12.73 950,163.00 12,092,914.00
b. Pasang Bekisting untuk Lantai m2 106.06 201,630.00 21,384,877.00
c. Penulangan dengan Besi Beton Polos kg 932.61 12,537.00 11,692,160.00
22 Membuat Plat Leufel Tbl. 8 Cm ( PL )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 2.80 871,852.00 2,441,185.00
b. Pasang Begisting m2 81.20 201,630.00 16,372,356.00
c. Penulangan dengan Besi Beton Polos kg 264.73 12,537.00 3,318,881.00
23 Membuat Plat Tangga
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 1.56 950,163.00 1,483,645.00
b. Pasang Begisting m2 13.01 201,630.00 2,623,649.00
c. Penulangan dengan Besi Beton Polos kg 234.86 12,537.00 2,944,424.00
24 Membuat Meja Beton
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.05 871,852.00 46,809.00
ee-3
1 2 4 5 6 7
b. Pasang Begisting m2 0.58 137,500.00 79,942.00
c. Penulangan dengan Besi Beton Polos kg 5.78 12,537.00 72,417.00
25 Rabat Beton Bawah Lantai m3 6.75 464,266.00 3,133,795.00
JUMLAH 287,452,536.00
VII PEKERJAAN LANGIT-LANGIT
1 Pas. Rangka langit-langit besi hollow 20 & 40+ Kalsiboard Tbl. 5 m2 4.75 139,331.00 661,822.00
2 Pas. Rangka langit-langit besi hollow 20 & 40+ Gypsum Tbl. 9 mm m2 130.25 142,053.00 18,502,403.00
3 Pasang List Plafond Gypsum Corner 10/10 m1 116.50 15,565.00 1,813,322.00
JUMLAH 20,977,547.00
VIII PEKERJAAN BACKDROP
1 Pasang Dinding Partisi Rangka Besi Hollow m2 37.45 94,655.00 3,544,829.00
2 Pasang Multipleks Tbl. 9 mm ( Dinding ) m2 37.45 65,065.00 2,436,684.00
3 Pasang Partisi MDF m2 7.70 73,351.75 564,808.00
4 Pasang List Gypsun Partisi MDF m1 8.80 15,565.00 136,972.00
5 Pasang List Papan 1/10 Kayu Kruing m1 10.70 53,388.50 571,256.00
6 Pasang HPL m2 24.57 180,515.50 4,435,265.00
7 Pasang List Stainless Steel M1 17.60 42,880.00 754,688.00
JUMLAH 12,444,502.00
IX PEKERJAAN KUSEN, PINTU, DAN JENDELA
1 Pasang Kusen Aluminium m1 63.78 132,821.00 8,471,323.00
2 Pasang Daun Pintu Frameless Kaca Tempered Dn 2.00 5,000,000.00 10,000,000.00
3 Pas. Daun Pintu Kaca rangka Aluminium m2 6.40 573,111.00 3,667,910.00
4 Pas. Daun Jendela Kaca Bening Rangk. Aluminium m2 5.45 500,511.00 2,728,785.00
5 Pasang Daun Pintu Panil Aluminium Unit 1.00 1,354,815.00 1,354,815.00
JUMLAH 26,222,833.00
X PEKERJAAN PENGGANTUNG, KUNCI DAN KACA
1 Pasang Kunci Tanam Biasa bh 4.00 138,765.00 555,060.00
2 Pasang Engsel Jendela bh 16.00 25,410.00 406,560.00
3 Pasang Engsel Pintu bh 12.00 36,470.00 437,640.00
4 Pasang Grendel Pintu bh 8.00 33,412.00 267,296.00
5 Pasang Grendel Jendela bh 8.00 24,062.00 192,496.00
6 Pasang Handle Pintu Stainless Steel bh 4.00 198,962.00 795,848.00
7 Pasang Hak Angin bh 16.00 149,462.00 2,391,392.00
8 Pasang Kaca Bening 5 mm m2 10.59 109,345.00 1,157,674.00
JUMLAH 6,203,966.00
XI PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasang Lantai Keramik 60x60 cm m2 102.95 234,245.00 24,115,522.00
2 Pasang Lantai Keramik 20X20 Cm m2 2.25 171,413.00 385,679.00
3 Pasang Dinding Keramik 20/25 Cm m2 7.98 201,700.00 1,609,566.00
4 Pasang Paving Block m2 15.50 170,500.00 2,642,750.00
5 Pasang Batu Tempel Andesit m2 12.80 257,345.00 3,294,016.00
6 Pasang Plint Keramik 10/20 m2 0.09 64,727.00 5,509.00
7 Pasang Tempat Sabun Bh 1.00 65,000.00 65,000.00
8 Pasang Ornamen Harmoni Kediri Bh 1.00 730,286.09 730,286.00
9 Pasang Ornamen Kediri The Service City Bh 1.00 891,563.64 891,563.00
10 Pasang Letter Stainless Steel + Arylic Tinggi 20 Cm Bh 14.00 150,000.00 2,100,000.00
11 Pasang Letter Stainless Steel + Arylic Tinggi 12 Cm Bh 4.00 95,000.00 380,000.00
12 Pasang Letter Stainless Steel + Arylic Tinggi 10 Cm Bh 58.00 80,000.00 4,640,000.00
13 Pasang Sun Blaster m2 7.47 188,490.50 1,408,401.00
JUMLAH 42,268,292.00
XII PEKERJAAN BESI
1 Pasang Rilling Tangga ( Besi Hollow ) m2 6.32 238,315.00 1,505,674.00
2 Pasang Sunscreen ( Besi Hollow ) m2 2.27 159,555.00 361,870.00
JUMLAH 1,867,544.00
XIII PEKERJAAN PENGECATAN
1 Mengecat Bidang Tembok Baru dengan Cat Interior m2 328.02 21,694.00 7,116,035.00
2 Mengecat Bidang Tembok Baru dengan Cat Eksterior m2 161.56 37,534.00 6,064,045.00
3 Mengecat Bidang Plafond Baru dg. Cat Interior m2 135.00 21,694.00 2,928,690.00
4 Mengecat Bidang MDF baru dengan Cat Duco m2 7.00 88,627.00 620,389.00
5 Mengecat Bidang Kayu Baru m2 4.90 58,844.00 288,453.00
6 Mengecat Bidang Besi m2 13.52 58,844.00 795,563.00
7 Coating Bidang Batu m2 12.80 30,024.00 384,307.00
JUMLAH 18,197,482.00
XIV PEKERJAAN SANITASI
ee-4
1 2 4 5 6 7
1 Pasang Sal. Air Bersih PVC Type AW Ø 1/2 " m1 17.00 16,635.00 282,795.00
2 Pasang Sal. Air Intlet PVC Type AW Ø 3/4 " m1 15.50 18,162.00 281,511.00
3 Pasang Sal. Air Limbah PVC Type D Ø 3 " m1 17.70 57,868.00 1,024,263.00
4 Pasang Sal. Air Kotor PVC Type D Ø 4 " m1 13.00 71,511.00 929,643.00
5 Pasang Talang Pembuluh PVC Type D Ø 4 " m1 76.00 71,511.00 5,434,836.00
6 Pasang Kran Air Ø 1/4" Bh 1.00 47,602.00 47,602.00
7 Pasang Kran Washtafel Bh 1.00 67,402.00 67,402.00
8 Pasang Kran Leher Angsa Bh 1.00 111,512.00 111,512.00
9 Pasang Closet Duduk Bh 1.00 2,397,890.00 2,397,890.00
10 Pasang Washtafel Bh 1.00 660,385.00 660,385.00
11 Pasang Kitchen Sink Bh 1.00 441,366.00 441,366.00
12 Pasang Floor Drain Ø3" Bh 1.00 34,705.00 34,705.00
13 Membuat Sumuran Air ( Lengkap ) Unit 1.00 1,000,000.00 1,000,000.00
14 Pasang Pompa Air Unit 1.00 400,000.00 400,000.00
15 Bio Septic Tank ( Terpasang ) Unit 1.00 4,072,000.00 4,072,000.00
JUMLAH 17,185,910.00
XV PEKERJAAN LISTRIK
1 Pasang Instalasi Titik Lampu Ttk 53.00 221,320.00 11,729,960.00
2 Pasang Stop Kontak Bh 7.00 29,806.00 208,642.00
3 Pasang Saklar Ganda Bh 1.00 28,706.00 28,706.00
4 Pasang Saklar Tunggal Bh 6.00 33,964.00 203,784.00
5 Pasang Lampu SL 23 W Bh 3.00 69,956.00 209,868.00
6 Pasang Lampu SL 18 W Bh 2.00 65,556.00 131,112.00
7 Pasang Lampu Lampu RMI Bh 6.00 254,206.00 1,525,236.00
8 Pasang Lampu Baret 23 W Bh 1.00 199,206.00 199,206.00
9 Pasang Indirect Lamp ( Lampu Pita ) M1 12.00 187,500.00 2,250,000.00
10 Pasang Lampu LED Bh 152.00 47,956.00 7,289,312.00
11 Pasang Lampu Tempel Bh 2.00 281,706.00 563,412.00
12 Pasang Zekring Bh 1.00 199,206.00 199,206.00
13 Pasang Exhausfan Bh 1.00 210,206.00 210,206.00
JUMLAH 24,748,650.00
JUMLAH A 558,814,218.00
B LANTAI ATAS
I PEKERJAAN PASANGAN
1 Pas. Bata merah 1/2 Batu, Camp. 1 Pc : 3 Ps m2 26.76 90,688.00 2,426,357.00
2 Pas. Batamerah 1/2 Batu, Camp. 1 Pc : 6 Ps m2 185.07 84,385.00 15,617,131.00
JUMLAH 18,043,488.00
II PEKERJAAN PLESTERAN
1 Plesteran dinding 1 Pc : 3 Ps m2 53.51 53,175.00 2,845,394.00
2 Plesteran dinding 1 Pc : 6 Ps m2 370.14 49,488.00 18,317,488.00
3 Acian m2 423.65 30,030.00 12,722,209.00
4 Benangan m1 98.80 12,644.00 1,249,227.00
JUMLAH 35,134,318.00
III PEKERJAAN BETON
1 Membuat Kolom 12/12 ( K5 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.75 871,852.00 652,842.00
b. Pasang Begisting m2 12.48 133,320.00 1,663,833.00
c. Penulangan dengan Besi Beton Polos kg 185.71 12,537.00 2,328,246.00
2 Membuat Kolom 30/30 ( K4 )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 2.16 950,163.00 2,052,352.00
b. Pasang Begisting m2 28.80 133,320.00 3,839,616.00
c. Penulangan dengan Besi Beton Polos kg 389.45 12,537.00 4,882,491.00
3 Membuat Balok Latay 12/20 ( BL )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.37 871,852.00 326,421.00
b. Pasang Begisting m2 8.11 137,500.00 1,115,400.00
c. Penulangan dengan Besi Beton Polos kg 79.21 12,537.00 993,042.00
4 Membuat Balok Gantung 15/20 ( BG1 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.14 871,852.00 122,931.00
b. Pasang Begisting m2 2.59 137,500.00 355,437.00
c. Penulangan dengan Besi Beton Polos kg 30.85 12,537.00 386,748.00
5 Membuat Balok Gantung 15/20 ( BG2 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.08 871,852.00 71,927.00
b. Pasang Begisting m2 1.51 137,500.00 207,968.00
c. Penulangan dengan Besi Beton Polos kg 18.25 12,537.00 228,819.00
6 Membuat Ringbalk 12/20 ( RB2 )
ee-5
1 2 4 5 6 7
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.36 871,852.00 317,633.00
b. Pasang Begisting m2 7.89 137,500.00 1,085,370.00
c. Penulangan dengan Besi Beton Polos kg 77.08 12,537.00 966,306.00
7 Membuat Ringbalk 15/30 ( RB1 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 2.17 871,852.00 1,889,477.00
b. Pasang Begisting m2 36.12 137,500.00 4,966,500.00
c. Penulangan dengan Besi Beton Polos kg 277.47 12,537.00 3,478,695.00
8 Membuat Ringbalk 20/30 ( RB3 )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.45 871,852.00 392,333.00
b. Pasang Begisting m2 2.70 137,500.00 371,250.00
c. Penulangan dengan Besi Beton Polos kg 76.81 12,537.00 963,006.00
9 Membuat Balok Penahan Talang 15/20 ( BT )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.53 871,852.00 457,722.00
b. Pasang Begisting m2 9.63 137,500.00 1,323,437.00
c. Penulangan dengan Besi Beton Polos kg 129.56 12,537.00 1,624,310.00
10 Membuat Konsol Penahan Talang ( KT )
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 0.50 950,163.00 475,081.00
b. Pasang Begisting m2 7.00 137,500.00 962,500.00
c. Penulangan dengan Besi Beton Polos kg 88.67 12,537.00 1,111,681.00
11 Membuat Listplank 8/45 ( LP )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.68 871,852.00 590,069.00
b. Pasang Begisting m2 19.93 201,630.00 4,018,082.00
c. Penulangan dengan Besi Beton Polos kg 64.76 12,537.00 811,909.00
12 Membuat Plat Leufel Tbl. 8 Cm ( PL )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.54 871,852.00 470,800.00
b. Pasang Begisting m2 15.66 201,630.00 3,157,525.00
c. Penulangan dengan Besi Beton Polos kg 51.05 12,537.00 640,070.00
13 Membuat Meja Beton
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.06 871,852.00 55,536.00
b. Pasang Begisting m2 0.58 201,630.00 117,227.00
c. Penulangan dengan Besi Beton Polos kg 6.36 12,537.00 79,673.00
14 Membuat Listplank Beton ( Depan )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 4.48 871,852.00 3,905,896.00
b. Pasang Begisting m2 123.20 201,630.00 24,840,816.00
c. Penulangan dengan Besi Beton Polos kg 406.30 12,537.00 5,093,761.00
15 Membuat Plat Beton Dudukan Tandon
a. Membuat Beton Mutu fc' = 21,7 Mpa m3 0.40 950,163.00 380,255.00
b. Pasang Begisting m2 3.34 201,630.00 672,436.00
c. Penulangan dengan Besi Beton Polos kg 29.33 12,537.00 367,653.00
16 Membuat Talang Beton ( TB )
a. Membuat Beton Mutu fc' = 14,5 Mpa m3 0.01 871,852.00 7,476.00
b. Pasang Begisting m2 2.70 201,630.00 543,392.00
c. Penulangan dengan Besi Beton Polos kg 8.02 12,537.00 100,540.00
JUMLAH 85,466,490.00
IV PEKERJAAN KAYU
1 Pasang Gording, Nok, 8/12 Kayu Kruing m3 1.24 12,287,000.00 15,228,016.00
2 Pas. Rangka Penutup Atap Genteng Glazuur Kayu Kruing m2 225.75 203,978.00 46,047,176.00
3 Pasang Listplank Kalsiboard 1/30 m1 16.30 52,288.00 852,294.00
JUMLAH 62,127,486.00
V PEKERJAAN BESI
1 Rafter WF 200.100.5,5.8 kg 919.88 26,004.00 23,920,532.00
2 Nok dan Jurai WF 150.75.5.7 kg 253.76 26,004.00 6,598,879.00
3 Konsol WF 150.75.5.7 kg 140.00 26,004.00 3,640,560.00
4 Siku Dudukan Gording L 100.100.8 kg 15.37 26,004.00 399,733.00
5 Dudukan Nok UNP 100.50.5 kg 2.25 26,004.00 58,456.00
6 Pasang Plat Joint Tbl. 8 mm kg 254.58 26,004.00 6,620,019.00
7 Pasang Plat Joint Tbl. 7 mm kg 38.21 26,004.00 993,730.00
8 Pasang Plat Pengaku Tbl. 8 mm kg 74.18 26,004.00 1,928,929.00
9 Pasang Plat Pengaku Tbl. 7 mm kg 18.66 26,004.00 485,144.00
10 Pasang Plat Buhul Tbl. 8 mm kg 376.27 26,004.00 9,784,427.00
11 Pasang Plat Buhul Tbl. 7 mm kg 30.21 26,004.00 785,641.00
12 Pas. Plat Plendes + Pengaku Kaki Rafter Tbl. 10 mm kg 279.96 26,004.00 7,280,079.00
13 Pasang Plat Dudukan Siku Tbl. 10 mm kg 97.05 26,004.00 2,523,761.00
14 Pasang Angkur Baut Ø16-400 Bh 106.07 11,891.00 1,261,337.00
ee-6
1 2 4 5 6 7
15 Baut Ø16" Bh 120.00 5,285.00 634,200.00
16 Baut Ø12" Bh 36.00 4,851.00 174,636.00
17 Ikatan Angin Ø16" kg 71.08 13,965.00 992,601.00
18 Trekstang Ø16 + Waltermoor kg 50.51 13,965.00 705,398.00
19 Pasang Rilling Tangga dan Teras ( Besi Hollow ) m2 7.38 238,315.00 1,758,764.00
20 Pasang Sunscreen ( Besi Hollow ) m2 1.88 159,555.00 299,963.00
21 Pasang Tangga Monyet Bh 1.00 1,053,390.00 1,053,390.00
JUMLAH 71,900,179.00
VI PEKERJAAN PENUTUP ATAP
1 Pasang Genteng Glazuur m2 225.75 123,909.00 27,971,936.00
2 Pasang Genteng Bubung Glazzur m1 20.05 99,044.00 1,985,436.00
3 Pasang Talang Datar m1 5.55 155,837.00 864,272.00
JUMLAH 30,821,644.00
VII PEKERJAAN LANGIT-LANGIT
1 Pas. Rangka Plafond besi hollow 20 & 40+ Kalsiboard Tbl. 5 mm m2 4.75 139,331.00 661,822.00
2 Pas. Rangka Plafond besi hollow 20 & 40+ Gypsum Tbl. 9 mm m2 130.25 142,053.00 18,502,403.00
3 Pasang List Plafond Gypsum Corner 10/10 m1 132.56 15,565.00 2,063,296.00
JUMLAH 21,227,521.00
VIII PEKERJAAN KUSEN, PINTU, JENDELA, DAN PARTISI
1 Pasang Kusen Aluminium m1 103.40 132,821.00 13,733,691.00
2 Pas. Daun Pintu Kaca rangka Aluminium m2 6.00 573,111.00 3,438,666.00
3 Pas. Daun Jendela Kaca Bening Rangk. Aluminium m2 12.99 500,511.00 6,502,638.00
4 Pasang Pintu Panil Aluminium Unit 1.00 1,354,815.00 1,354,815.00
5 Dinding Partisi Gypsum Rangka Galvalum m2 46.27 206,931.00 9,574,697.00
6 Pasang Papan List 1/10 m1 4.82 53,388.50 257,546.00
JUMLAH 34,862,053.00
IX PEKERJAAN PENGGANTUNG, KUNCI DAN KACA
1 Pasang Kunci Tanam Biasa bh 3.00 138,765.00 416,295.00
2 Pasang Engsel Jendela bh 38.00 25,410.00 965,580.00
3 Pasang Engsel Pintu bh 12.00 36,470.00 437,640.00
4 Pasang Grendel Pintu bh 8.00 33,412.00 267,296.00
5 Pasang Grendel Jendela bh 19.00 24,062.00 457,178.00
6 Pasang Hadle Pintu Stainless Steel bh 4.00 198,962.00 795,848.00
7 Pasang Hak Angin bh 38.00 149,462.00 5,679,556.00
8 Pasang Kaca Bening 5 mm m2 42.18 109,345.00 4,612,058.00
JUMLAH 13,631,451.00
X PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasang Lantai Keramik 60x60 cm m2 137.23 234,245.00 32,145,441.00
2 Pasang Lantai Keramik 20X20 Cm m2 2.25 171,413.00 385,679.00
3 Pasang Dinding Keramik 20/25 Cm m2 7.98 201,700.00 1,609,566.00
4 Pasang Plint Keramik 10/20 m2 5.62 64,727.00 363,765.00
5 Pasang Batu Tempel Andesit m2 4.80 257,345.00 1,235,256.00
6 Pasang Tempat Sabun Bh 1.00 65,000.00 65,000.00
7 Pasang Sun Blaster m2 4.80 180,515.50 866,474.00
JUMLAH 36,671,181.00
XI PEKERJAAN PENGECATAN
1 Mengecat Bidang Tembok Baru dengan Cat Interior m2 357.91 21,694.00 7,764,440.00
2 Mengecat Bidang Tembok Baru dengan Cat Eksterior m2 176.28 37,534.00 6,616,594.00
3 Mengecat Bidang Plafond Baru dengan Cat Interior m2 135.00 21,694.00 2,928,690.00
4 Mengecat Bidang Kayu Baru m2 10.04 58,844.00 590,793.00
5 Mengecat Bidang Besi Baru m2 15.79 58,844.00 929,076.00
6 Coating Bidang Batu m2 4.80 30,024.00 144,115.00
JUMLAH 18,973,708.00
XII PEKERJAAN SANITASI
1 Pasang Sal. Air Bersih PVC Type AW Ø 1/2 " m1 13.00 16,635.00 216,255.00
2 Pasang Sal. Air Outlet PVC Type AW Ø 1/2 " m1 5.00 16,635.00 83,175.00
3 Pasang Sal. Air Inlet PVC Type AW Ø 3/4 " m1 16.20 18,162.00 294,224.00
4 Pasang Sal. Air Limbah PVC Type AW Ø 2 " m1 4.50 41,864.00 188,388.00
5 Pasang Sal. Air Limbah PVC Type D Ø 3 " m1 9.50 57,868.00 549,746.00
6 Pasang Talang Pembuluh PVC Type D Ø 4 " m1 169.50 71,511.00 12,121,114.00
7 Pasang Washtafel Bh 1.00 660,385.00 660,385.00
8 Pasang Tandon Air Stainless Steel Kap. 500 Ltr. Bh 1.00 3,193,982.00 3,193,982.00
9 Pasang Kran Air Ø 1/4" Bh 1.00 47,602.00 47,602.00
10 Pasang Kran Air Washtafel Bh 1.00 67,402.00 67,402.00
ee-7
1 2 4 5 6 7
11 Pasang Kran Leher Angsa Bh 1.00 111,512.00 111,512.00
12 Pasang Stop Kran Bh 2.00 58,602.00 117,204.00
13 Pasang Closet Duduk Bh 1.00 2,397,890.00 2,397,890.00
14 Pasang Floor Drain Ø3" Bh 1.00 34,705.00 34,705.00
15 Pasang Roof Drain Ø4" Bh 10.00 24,255.00 242,550.00
JUMLAH 20,326,134.00
XIII PEKERJAAN LISTRIK
1 Pasang Instalasi Titik Lampu Ttk 26.00 221,320.00 5,754,320.00
2 Pasang Stop Kontak Bh 7.00 29,806.00 208,642.00
3 Pasang Saklar Ganda Bh 3.00 28,706.00 86,118.00
4 Pasang Saklar Tunggal Bh 5.00 33,964.00 169,820.00
5 Pasang Lampu SL 23 W Bh 5.00 69,956.00 349,780.00
6 Pasang Lampu SL 18 W Bh 2.00 65,556.00 131,112.00
7 Pasang Lampu MRI Bh 3.00 254,206.00 762,618.00
8 Pasang Lampu Baret Bh 1.00 199,206.00 199,206.00
9 Pasang Lampu Tempel Bh 2.00 281,706.00 563,412.00
10 Pasang Exhausfan Bh 1.00 210,206.00 210,206.00
11 Pas. Satuan Sambungan Listrik Baru Daya 5500 VA Unit 1.00 9,020,000.00 9,020,000.00
JUMLAH 17,455,234.00
JUMLAH B 466,640,887.00
ee-8
REKAPITULASI ANALISA DAN HARGA SATUAN BAHAN / UPAH PEKERJA
KOTA KEDIRI 2018
A. 2.2.1.14.c MEMBONGKAR 1 M3 KUDA-KUDA JIKA TIDAK DIPAKAI KEMBALI ( TINGGI KURANG 3.5 M ) ( Mokomuko ) A. 2.2.1.14.c
A.4.1.1.8. Membuat 1 m3 beton mutu f’ c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 A.4.1.1.8.
Membuat 1 m3 beton mutu f’ c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,56 A.4.1.1.5.
Membuat 1 m3 beton mutu f’ c = 7,4 MPa (K 100) A.4.1.1.1.
Membuat 1 m3 beton mutu f’ c = 3,7 MPa (K 60) A.4.1.1.1.a.
A.4.2.1.19 Pemasangan 1 m talang 1⁄2 lingkaran D-15 cm. seng plat bjls 30 lebar 45 cm A.4.2.1.19
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 80 x 60 cm, plafon A.4.2.1.21.
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1⁄2 batu campuran 1SP : 3 PP A. 4.4.1.8
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal 1⁄2 batu campuran 1SP : 6 PP A. 4.4.1.11
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III ( Kamfer ) A.4.6.1.2.
A.4.6.1.2a. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu LAMA A.4.6.1.2a.
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II ( Kamfer ) A.4.6.1.5.
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II ( Kamfer ) A.4.6.1.6.
A.4.6.1.6a. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu LAMA #N/A
A.4.6.1.20.a Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, KAYU LAMA #N/A
Pemasangan 1 m’ List Papan 1/10 Kayu Kruing A.4.6.1.22.c.
A.4.6.1.22.a Pemasangan 1 m’ woodplank 1/20 A.4.6.1.22.a
Pemasangan 1 m’ Kalsiplank 1/30 A.4.6.1.22.b
A.4.7.1.4. 1 m2 Pengecatan bidang kayu lama (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.4.
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) A.4.7.1.5.
Pengecatan 1 m2 bidang kayu baru dengan Cat Duco (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) A.4.7.1.5.a
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) #N/A
Pengecatan 1 m2 tembok baru Acrylic (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.10.
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.11.
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” A.5.1.1 26.
A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” A.5.1.1 27.
A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” A.5.1.1 28.
A.5.1.1 32.b Pemasangan 1 bh bak kontrol pasangan batu bata (45 x 45) cm t 50 cm A.5.1.1 32b.
m2 0.1500 12,650.00
m3 14.0000 1,026,641.00
m3 7.0000 513,320.00
m2 2.1000 154,000.00
m2 0.0300 1,265.00
m2 0.5750 5,115.00
m3 6.6000 418,000.00
m3 0.7750 56,375.00
m3 0.9450 69,300.00
m3 1.1170 82,445.00
m3 1.0320 75,020.00
m1 1.1340 83,160.00
m3 0.2325 16,912.00
m3 0.5500 41,250.00
m3 0.3100 174,350.00
m3 0.2750 20,625.00
m3 0.2750 20,625.00
m3 2.4000 623,997.00
m3 1.2480 326,634.00
m3 2.1180 950,163.00
m3 2.0360 871,852.00
m3 2.0360 776,734.00
m3 1.6940 464,266.00
m3 2.0360 849,006.00
m3 2.0050 #N/A
kg 0.1510 125,378.00
kg 0.0151 12,537.00
kg 0.1510 128,843.00
kg 0.0151 12,884.00
m2 0.8320 75,808.00
m2 0.8320 61,668.00
m2 1.0560 133,320.00
m2 1.0560 137,500.00
m2 1.0560 201,630.00
m2 1.0560 #N/A
m2 1.0560 232,293.00
kg 0.1290 #N/A
kg 0.1290 26,004.00
kg 0.2060 #N/A
m2 0.5250 159,555.00
cm 0.0640 #N/A
m2 0.5250 238,315.00
#N/A #N/A #N/A
m1 0.0924 132,821.00
m1 0.0924 12,365.00
m2 0.1840 573,111.00
m2 0.1840 500,511.00
m2 3.5900 #N/A
m1 0.4210 155,837.00
m1 0.4880 #N/A
m2 1.0000 #N/A
m2 0.5150 39,490.00
m2 0.5440 #N/A
m2 0.2105 #N/A
m2 3.5900 #N/A
Bh #N/A 2,000.00
Bh #N/A 150,000.00
Bh #N/A 95,000.00
Bh #N/A -
Unit #N/A -
Bh #N/A -
Bh #N/A 80,000.00
m2 0.5380 94,655.00
M2 -
Bh 1.0000 11,891.00
Bh 1.0000 5,285.00
Bh 1.0000 4,851.00
kg 0.0232 13,965.00
Bh #REF! 1,053,390.00
m2 0.4250 90,688.00
m2 0.4250 84,385.00
m2 0.4250 54,505.00
m2 0.4800 56,190.00
m2 0.4800 53,175.00
m2 0.4800 49,488.00
m1 0.5240 53,003.00
m2 0.4250 40,631.00
m2 0.3200 30,030.00
m1 0.1350 12,644.00
m2 1.1150 115,445.00
m2 1.1200 171,413.00
m2 1.4400 201,700.00
m2 1.1150 234,245.00
m2 1.4400 799,231.00
m2 0.2200 64,727.00
m2 1.1200 #N/A
m2 0.8000 170,500.00
m2 0.5440 180,515.50
m2 1.1150 234,245.00
M1 42,880.00
m2 1.1200 257,345.00
Bh 65,000.00
m2 0.5440 180,515.50
m2 0.5440 188,490.50
Bh 11.5088 730,286.09
Bh 12.9844 891,563.64
m2 0.1600 #N/A
m2 0.1600 40,466.00
m1 0.1080 9,630.00
m2 1.0000 142,053.00
- - -
m2 1.0000 139,331.00
m2 0.2150 65,065.00
m2 1.0000 73,351.75
m1 0.1080 15,565.00
m2 0.2410 #N/A
m2 0.2410 123,909.00
m1 0.6220 #N/A
m2 0.3110 #N/A
m2 0.1536 #N/A
m2 0.2410 19,866.00
m1 0.6220 #N/A
m3 26.1000 #N/A
m3 26.1000 2,432,100.00
m2 4.3500 #N/A
m2 3.4800 #N/A
m3 29.1450 #N/A
m3 29.1450 12,287,000.00
m3 29.1450 #N/A
m2 0.2150 203,978.00
#N/A #N/A #N/A
m2 1.0000 206,931.00
bh 0.5650 138,765.00
bh 0.1808 36,470.00
bh 0.1205 25,410.00
bh 0.1880 149,462.00
bh 0.1880 33,412.00
bh 0.1880 24,062.00
bh 0.1880 #N/A
bh 0.1880 198,962.00
bh 0.6030 #N/A
m2 0.1808 109,345.00
m2 0.1808 #N/A
Dn 5,000,000.00
m2 0.2000 #N/A
m2 0.1550 35,183.00
m2 0.1820 58,844.00
m2 0.1820 88,627.00
#N/A #N/A #N/A
m2 0.0923 10,272.00
m2 0.0772 #N/A
m2 0.0772 #N/A
m2 0.0923 37,534.00
m2 0.0923 21,694.00
m2 0.2425 #N/A
m2 0.0920 30,024.00
Bh 4.5700 2,397,890.00
Bh 0.8100 3,193,982.00
Bh 0.4600 52,580.00
Bh 0.4550 111,512.00
Bh 0.5520 660,385.00
Bh 0.0950 67,402.00
Bh 0.1380 441,366.00
m1 0.1040 18,162.00
m1 0.1040 9,361.00
m1 0.1560 #N/A
m1 0.1560 41,864.00
m1 0.2335 #N/A
m1 0.2335 57,868.00
m1 0.2335 64,795.00
m1 0.2240 #N/A
Bh 0.4840 #N/A
Bh 0.5520 660,385.00
Bh 0.1380 441,366.00
m1 0.3114 125,818.00
m1 0.2335 71,511.00
#N/A #N/A #N/A
Bh #N/A 2,800,000.00
Unit #N/A -
Unit #N/A 1,000,000.00
Unit #N/A 4,072,000.00
Unit #N/A -
Unit #N/A 400,000.00
Unit 4,072,000.00
Bh 0.0706 29,806.00
Bh 0.0706 47,956.00
Bh 0.1284 33,964.00
Bh 0.0706 28,706.00
Bh 0.0706 65,556.00
Bh 0.0706 199,206.00
Bh 0.0706 #N/A
Bh 0.0706 210,206.00
Bh 0.0706 69,956.00
Bh 0.0706 199,206.00
ANALISA DAN HARGA SATUAN BAHAN / UPAH PEKERJA
KOTA KEDIRI TAHUN ANGGARAN 2017
###
###
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank ###
Anal-1
No Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 0.02 65,000.00 1,300.00
Mandor OH 0.0100 100,000.00 1,000.00
0.0300 JUMLAH TENAGA 2,300.00
B BAHAN
JUMLAH BAHAN
C PERALATAN
JUMLAH ALAT
D Jumlah (A+B+C) x 0.5 1,150.00
E Overhead & Profit 10% 115.00
F Harga Satuan Pekerjaan (D+E) 1,265.00
A. 2.2.1.14.b BONGKAR 1 M2 RENG/USUK UNTUK TIDAK DIPAKAI KEMBALI ( Mokomuko ) ###
Anal-2
D Jumlah (A+B+C) 51,250.00
E Overhead & Profit 10% 5,125.00
F Harga Satuan Pekerjaan (D+E) 56,375.00
Anal-4
Harga Satuan Jumlah Harga
No Uraian Satuan Koefisien
( Rp. ) ( Rp. )
A TENAGA
Pekerja OH 1.3200 65,000.00 85,800.00
Tukang Batu OH 0.2200 85,000.00 18,700.00
Kepala Tukang OH 0.0220 90,000.00 1,980.00
Mandor OH 0.1320 100,000.00 13,200.00
1.6940 JUMLAH TENAGA 119,680.00
B BAHAN
Semen Portland Kg 20.0000 1,200.00 24,000.00
Pasir Beton m3 0.5220 170,000.00 88,740.00
Kerikil (Maksimum 30mm) M3 0.8620 220,000.00 189,640.00
JUMLAH BAHAN 302,380.00
C PERALATAN
JUMLAH ALAT
D Jumlah (A+B+C) 422,060.00
E Overhead & Profit 10% 42,206.00
F Harga Satuan Pekerjaan (D+E) 464,266.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,56 ###
A.4.1.1.8. Membuat 1 m3 beton mutu f’ c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 ###
Anal-8
A.4.2.1.1.a Pemasangan 1 kg besi Pengikat ( Besi Polos ) ###
A.4.2.1.20.a Pemasangan 1 m2 rangka besi hollow 2x40.40.40 mm, modul 10 x40 cm ###
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 80 x 60 cm, plafon ###
A.4.2.1.20.c Pasang 1 Bh Tangga Monyet Ting. 3,2 m1 Lb. 0,4 m rangka GIP Ø2" dan Anak Tangga###
B
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1⁄2 batu campuran 1SP : 3 PP###
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal 1⁄2 batu campuran 1SP : 6 PP ###
A.4.5.1.7.a Pemasangan 1 m2 rangka besi hollow 20/40,40/40 , 1 mm Plafond Gypsum Board Tbl. 9 mm
###
A.4.5.1.7.b Pemasangan 1 m2 rangka besi hollow 20/40,40/40 , 1 mm Plafond Kalsi Board Tbl. 9 mm mod
###
A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng glazuur, Usuk Kruing 5/7 & Reng Kruing 2/3 ###
A.4.7.1.4. 1 m2 Pengecatan bidang kayu lama (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) ###
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) ###
A.4.7.1.5.a Pengecatan 1 m2 bidang kayu baru dengan Cat Duco (1 lapis plamuur, 1 lapis cat dasar, 3 lapis
###
A.4.7.1.10.a Pengecatan 1 m2 tembok baru dengan Cat Eksterior (1lapis plamur, 1 lapis cat dasar, 2###
la
Anal-32
A.5.1.1 5. Pemasangan 1 buah wastafel ###
Anal-34
0.1250 JUMLAH TENAGA 10,550.00
B BAHAN
Roof Drain Dia. 4 " Bh 1.0000 11,500.00 11,500.00
JUMLAH BAHAN 11,500.00
C PERALATAN
JUMLAH ALAT
D Jumlah (A+B+C) 22,050.00
E Overhead & Profit 10% 2,205.00
F Harga Satuan Pekerjaan (D+E) 24,255.00
Anal-35
Sealtape Bh 0.0250 5,000.00 125.00
JUMLAH BAHAN 53,125.00
C PERALATAN
JUMLAH ALAT
D Jumlah (A+B+C) 61,275.00
E Overhead & Profit 10% 6,127.50
F Harga Satuan Pekerjaan (D+E) 67,402.00
Anal-38
B.6.1.1 HARGA SATUAN PEKERJAAN LISTRIK
B.6.1.1.1. Pemasangan 1 titik instalasi listrik ###
Anal-42
HARGA SATUAN BAHAN DAN UPAH TENAGA
KOTA KEDIRI TAHUN 2017
HARGA
No. URAIAN KODE SATUAN SATUAN
( Rp. )
1 2 3 4 5
1. UPAH TENAGA KERJA
01 Pekerja L. 01 OH 65,000.00
02.a Tukang Batu L. 02.a OH 85,000.00
02.b Tukang Kayu L. 02.b OH 85,000.00
02.c Tukang Cat L. 02.c OH 85,000.00
02.d Tukang Besi L. 02.d OH 85,000.00
02.e Tukang Pipa L. 02.e OH 85,000.00
02.f Tukang Listrik L. 02.f OH 85,000.00
02.g Tukang Las L. 02.g OH 85,000.00
02.h Tukang Aluminium L. 02.h OH 85,000.00
03 Kepala Tukang L. 03 OH 90,000.00
04 Mandor L. 04 OH 100,000.00
2. BAHAN
A. BAHAN ALAM
01 Pasir urug A. 01 M3 115,000.00
02 Pasir pasang A. 02 M3 170,000.00
04 Pasir beton A. 04 m3 170,000.00
05 Pasir beton ( * ) A. 05 Kg 121.00
08 Batu belah 15/20 cm. A. 08 M3 130,000.00
12 Batu koral 2/3 cm. A. 12 M3 220,000.00
13 Batu koral 2/3 cm. ( * ) A. 13 Kg 162.00
20 Batu bata merah kelas I A. 20 Bh 400.00
24 Semen PC (Gresik) A. 24 Kg 1,200.00
25 Air A. 25 Lt 6.00
27 Semen berwarna A. 27 Kg 2,600.00
B. BAHAN KAYU
07 Kayu kamper papan B. 07 M3 10,000,000.00
11 Kayu kruing balok 8/12 cm. B. 11 M3 7,800,000.00
12 Kayu kruing papan B. 12 M3 7,800,000.00
13 Kayu kruing usuk 5/7 cm. B. 13 M3 7,800,000.00
14 Kayu kruing reng 2/3 cm. B. 14 M3 7,800,000.00
17 Kayu begisting usuk 5/7 cm. B. 17 M3 3,800,000.00
25 Kayu Sengon Papan B. 25 M3 3,500,000.00
29 Bambu Ori B. 29 Btg 15,000.00
31 HPL B. 31 M2 110,000.00
33 List Stainless Steel lb. 1,2 cm ( Terpasang ) B. 33 M1 42,880.00
C. BAHAN PLAFOND, KERANGKA ATAP & PENUTUP ATAP
03 Genteng Glazzur C. 03 Bh 4,000.00
05 Genteng wuwung Glazzur C. 05 Bh 6,000.00
16 Gypsum board ( 120 x 240 ) 9 mm C. 16 Lbr 65,000.00
23 Triplek 122x244x9 mm. C. 23 Lbr 110,000.00
30 Seng gelombang BJLS 30 (1,8x0,9) m. C. 30 Lbr 41,000.00
33 Cotton Plester C. 33 Rol 30,000.00
34 Ongkos Pasang Pafond C. 34 m2 10,000.00
35 Kalsiboard 120X240 Tbl. 5 mm C. 35 Lbr 58,000.00
35a Kalsiplank 1/30 C. 35a M1 20,000.00
36 Pasang Acrylic Tbl. 2 mm C. 36 Lbr 400,000.00
42 MDF 122X124 Cm Tbl. 9 mm C. 42 M2 140,000.00
43 Pasang Mur + Baut Acrylic C. 43 Bh 1,500.00
44 List Gypsum C 10 C. 44 m1 5,400.00
HS-43
1 2 3 4 5
D. BAHAN BESI / LOGAM
01 Besi beton ulir D. 01 Kg 9,800.00
02 Besi beton polos D. 02 Kg 9,500.00
03 Kawat ikat beton D. 03 Kg 18,000.00
05 Besi profil WF D. 05 Kg 12,000.00
06 Besi plat strip D. 06 Kg 12,500.00
31 Kosen pintu alur aluminium D. 31 M1 100,000.00
34 Pintu kaca rangka aluminium Uk, 90 x 200 cm D. 34 m1 65,000.00
35 Jendela kaca rangka aluminium, Uk. 60 x 90 cm D. 35 m1 50,000.00
38 Hollow 4 x 2 mm T. 1,7 mm D. 38 m1 10,000.00
39 Hollow 4 x 4 x 1,7 mm D. 39 m1 18,000.00
53 Pipa galvanis 2" (BSA) D. 53 m1 58,000.00
70 Baja ringan mutu tinggi profil C 75.75. D. 70 M1 28,000.00
75 Profil Kaca D. 75 m1 47,000.00
77 Kawat Penggantung Plafond D. 77 m1 2,000.00
78 Letter Stain Less Steel Timbul + Arylic Tinggi 20 cm ( Terpasang ) D. 78 Bh 150,000.00
79 Letter Stain Less Steel Timbul + Arylic Tinggi 12 cm ( Terpasang ) D. 79 Bh 95,000.00
80 Letter Stain Less Steel Timbul + Arylic Tinggi 10 cm ( Terpasang ) D. 80 Bh 80,000.00
82 Ongkos Pasang Angkur Baut Ø16-400 D. 82 Bh 3,700.00
83 Angkur Baut Ø16-400 D. 83 Bh 9,000.00
84 Ongkos Pasang Angkur D. 84 Bh 1,250.00
85 Moor Baut Ø16 D. 85 Bh 4,500.00
86 Moor Baut Ø12 D. 86 Bh 4,000.00
87 Pintu Aluminium D. 87 Bh 1,200,000.00
HS-44
1 2 3 4 5
13 Handle Pintu stainless steel H. 13 Bh 165,000.00
14 Hak angin H. 14 Bh 120,000.00
I. BAHAN SANITAIR
01 Closet duduk porselin I. 01 Bh 1,750,000.00
HS-45
1 2 3 4 5
03 Kran air 1/2" I. 03 Bh 35,000.00
06 Wastafel I. 06 Bh 450,000.00
09 Floor drain I. 09 Bh 21,000.00
18 Bak cuci piring stainles steel I. 18 Bh 325,000.00
23 Kran Air Stainless (Gagang panjang) I. 23 Bh 53,000.00
24 Stop Kran I. 24 Bh 45,000.00
27 Membuat Sumuran Air ( Lengkap ) I. 27 Unit 1,000,000.00
28 Bio Septic Tank ( Terpasang ) I. 28 Unit 4,072,000.00
31 Tandon air Stainless kap. 500 ltr. I. 31 Bh 2,800,000.00
35 Seal Tape I. 35 Bh 5,000.00
36 Roof Drain Dia. 4 " I. 36 Bh 11,500.00
37 Waterdrain Kitchen Sink I. 37 Bh 65,000.00
38 Kran Leher Angsa I. 38 Bh 62,500.00
Kediri, 2017
Dibuat :
Penyedia
CV. DARMA BAKTI
HS-46
1 2 3 4 5
Drs. SA'RONI
Direktur
HS-47
JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )
BULAN KE
BOBOT
No. URAIAN PEKERJAAN I II III
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
A LANTAI BAWAH
I PEKERJAAN PENDAHULUAN 0.99
Chart Title
II PEKERJAAN TANAH 1.27
III PEKERJAAN PONDASI BATU BELAH 1.07
IV PEKERJAAN PASANGAN 2.46
V PEKERJAAN PLESTERAN 4.08
VI PEKERJAAN BETON 28.03
VII PEKERJAAN LANGIT-LANGIT 2.05
VIII PEKERJAAN BACKDROP 1.21
IX PEKERJAAN KUSEN, PINTU, DAN JENDELA 2.56
X PEKERJAAN PENGGANTUNG, KUNCI DAN KACA 0.60
XI PEKERJAAN PENUTUP LANTAI DAN DINDING 4.12
XII PEKERJAAN BESI 0.18
XIII PEKERJAAN PENGECATAN 1.77
XIV PEKERJAAN SANITASI 1.68
XV PEKERJAAN LISTRIK 2.41
B LANTAI ATAS
I PEKERJAAN PASANGAN 1.76
II PEKERJAAN PLESTERAN 3.43
III PEKERJAAN BETON 8.33
IV PEKERJAAN KAYU 6.06
V PEKERJAAN BESI 7.01
VI PEKERJAAN PENUTUP ATAP 3.01
VII PEKERJAAN LANGIT-LANGIT 2.07
VIII PEKERJAAN KUSEN, PINTU, JENDELA, DAN PARTISI 3.40
IX PEKERJAAN PENGGANTUNG, KUNCI DAN KACA 1.33
X PEKERJAAN PENUTUP LANTAI DAN DINDING 3.58
XI PEKERJAAN PENGECATAN 1.85
XII PEKERJAAN SANITASI 1.98
XIII PEKERJAAN LISTRIK 1.70
RENCANA BOBOT 100 0.00 1.00 1.00 1.00 1.65 2.20 2.15 4.00 5.00 5.50 6.50 6.41 6.59 7.12 5.86 6.32 4.70 5.00 3.65
KOMULATIF BOBOT RENCANA 0.00 1.00 2.00 3.00 4.65 6.85 9.00 13.00 18.00 23.50 30.00 36.41 43.00 50.12 55.98 62.30 67.00 72.00 75.65
AKSANAAN ( TIME SCHEDULE )
BULAN KE
III IV SKALA KETERANGAN
20 21 22 23 24 25 26 27 28 29 30
Chart Title 100
90
70
60
50
40
30
20
10
4.20 3.65 3.50 3.12 3.13 1.86 1.91 1.04 0.79 0.65 0.50 0
79.85 83.50 87.00 90.12 93.25 95.11 97.02 98.06 98.85 99.50 100.0 RENCANA :
Kediri, 2017
Dibuat oleh ;
Konsultan Perencana
CV. SETIA GRAHA CONSULTANT
Ir. SUHARI
Direktur
BACK UP VOLUME
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 6.00 x 15.00 90.00 m2
2 bongkaran 8.00 + 8.00 + 10.00 + 10.00 36.00 m1
II PEKERJAAN TANAH
1 Galian tanah Pile 1 1.00 x 1.00 x 0.30 x 3.00 0.90
Pile 2 1.00 x 1.00 x 0.30 x 5.00 1.50
Pile 3 0.80 x 0.80 x 0.25 x 1.00 0.16
P. Batu kali 0.80 x 1.20 x 53.80 51.65 54.21 m3
2 Boring strouss dia.30 cm 3.14 x 0.15 x 0.15 x 6.00 x 8.00 48.00 m1
3 Urugan pasir Pile 1 1.00 x 1.00 x 0.05 x 3.00 0.15
Pile 2 1.00 x 1.00 x 0.05 x 5.00 0.25
Pile 3 0.80 x 0.80 x 0.05 x 1.00 0.03
P. Batu kali 0.80 x 0.05 x 53.80 2.15
Bawah lantai cad area 41.74 x 0.05 2.09 4.67 m3
IV PEKERJAAN BETON
Lantai 1
1 Strouss dia.30cm - 6m 3.14 x 0.15 x 0.15 x 6.00 x 9.00 3.82 m3
2 Pile 1 100/100/30 1.00 x 1.00 x 0.30 x 6.00 1.80 m3
3 Pile 2 100/100/30 1.00 x 1.00 x 0.30 x 5.00 1.50 m3
4 Pile 3 80/80/25 0.80 x 0.80 x 0.25 x 2.00 0.32 m3
5 Sloof 20/30 S1 0.20 x 0.30 x 13.00 0.78 m3
6 Sloof 15/20 S2 0.15 x 0.20 x 40.80 1.22 m3
7 Kolom 20/30 K1 0.20 x 0.30 x 5.00 x 8.00 2.40 m3
8 Kolom praktis KP 4.00 x 10.00 40.00 m1
9 Balok 20/30 B1 0.20 x 0.30 x 41.13 2.47 m3
10 Balok 15/25 B2 0.15 x 0.25 x 12.35 0.46 m3
11 Balok bordes 10/25 0.10 x 0.25 x 3.19 0.08 m3
12 Plat lantai t.12 cm cad area 60.00 x 0.12 7.20 m3
13 Plat canopy t.10 cm cad area 2.59 x 0.10 0.26 m3
14 Plat bordes tangga t.12 cm 0.80 x 1.59 x 0.12 0.19 m3
15 Plat anak tangga t.10 cm 0.10 x 4.20 x 0.80 0.34
0.50 x 0.12 x 0.18 x 0.80 x 15.00 0.13 0.47 m3
Lantai 2
1 Kolom 15/20 K2 0.15 x 0.20 x 3.30 x 8.00 0.79 m3
2 Kolom praktis KP 3.30 x 8.00 26.40
1.90 x 4.00 7.60 34.00 m1
3 Ring Balok 15/20 0.15 x 0.20 x 53.48 53.48 m1
V PEKERJAAN PASANGAN
Lantai 1
1 Pas. Trasram Bata merah 0.30 x 53.80 16.14
pengurang (daun pintu & jendela) (2.31) 13.83 m2
2 Pas. Bata Merah 3.20 x 12.00 38.40
pengurang (daun pintu & jendela) (22.42) 15.98 m2
3 Plesteran 1pc:4ps 18.00 x 2.00 sisi 36.00
45.00 x 2.00 sisi 90.00 126.00 m2
4 Plesteran 1pc:6ps 15.98 x 2.00 sisi 31.96 m2
5 1.53 x 6.80 10.40 m2
Pas. Bata merah (mainan depan teras)
6 Acian 126.00
31.96 157.96 m2
7 Benangan K1 3.50 x 2.00 x 8.00 56.00
Balok bordes 2.00 x 0.80 + 1.59 x 2.00 9.56
Plat canopy uk.500 2.00 x 0.50 + 1.00 x 2.00 6.00
uk.1500 2.00 x 1.50 + 3.00 x 2.00 18.00
Pas. Bata merah mainan 2.00 x 1.53 + 6.80 x 2.00 33.32
Opening kusen P1 6.75 x 2.00 x 1.00 13.50
P2 4.90 x 2.00 x 5.00 49.00
P2 WC 4.70 x 2.00 x 2.00 18.80
J1 4.00 x 2.00 x 2.00 16.00
J2 3.00 x 2.00 x 4.00 24.00
J3 4.90 x 2.00 x 1.00 9.80
J4 6.40 x 2.00 x 1.00 12.80
J5 2.00 x 2.00 x 2.00 8.00 284.38 m1
J6 4.80 x 2.00 x 1.00 9.60
8 kaca 0.80 x 3.00 x 2.00 4.80 m2
Lantai 2
1 Pas. Bata Merah 3.30 x 38.00 125.40 m2
2 Plesteran 1pc:6ps 125.40 x 2.00 sisi 250.80 m2
3 Acian 250.80 m2
4 Benangan K2 3.30 x 2.00 x 8.00 52.80 m1
XI PEKERJAAN PENGECATAN
1 Mengecat dinding interior 90.00 + 36.00 + 90.00 + 125.40 341.40 m2
2 Mengecat dinding eksterior 36.00 + 20.00 + 20.00 + 46.00 + 10.00 132.00 m2
3 Mengecat besi 10.80 + 8.50 19.30 m2
4 Mengecat plafond + list gypsump 75.00 + 18.20 + 90.00 + 6.69 189.89 m2
5 Coating batu alam 10.40 x 2.00 sisi 20.81 m2
6 Mengecat kayu (sending) P1 - + 3.78 x 2.00 sisi 7.56 m2
kitchen set
periode 5/7 sd 17/7/21 4%
PEKERJAAN TAMAN
PEKERJAAN KITCHEN SET