DIMENSIONS (m)
N
M
4.2336
KOLOM
LANTAI 2
A TENAGA
Pekerja L.01 OH
Mandor L.04 OH
B BAHAN
Kawat beton kg
Semen Portland kg
Pasir Beton m3
Kerikil m3
Plywood 9 mm Lbr
C PERALATAN
D Jumlah (A+B+C)
Overhead
E & Profit (Contoh 15%)
Harga
F Satuan Pekerjaan (D+E)
DIMENSIONS (m)
TOTAL AREA
WALL notes
(m^2)
WIDTH HEIGHT
4 3.8 15.2
2 3.8 7.6
2 6000 12000
20 28000 560000
7474101.3
15% x D
= Rp 31,642,355.26
BALOK VOLUME
B1 1.89
B2 4.4668
B1B 0.449
B1A 0.358
B2A 0.516
B2B 0.1511
BB 0.705
BA 0.6279
B1C 0.21
B3 1.395
B3A 0.66
B2C 0.588
TOTAL 12.0168
BALOK LANTAI3
No Uraian
A TENAGA
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
B BAHAN
Minyak bekisting
Kawat beton
Semen Portland
Pasir Beton
Kerikil
Plywood 9 mm
C PERALATAN
D Jumlah (A+B+C)
total harga=
si + bekisting
m3 0.32 Rp 4,969,500.00
kg 3.2 Rp 18,600.00
kg 210 Rp 1,561.00
kg 3 Rp 21,900.00
kg 336 Rp 1,707.00
m3 0.54 Rp 288,800.00
m3 0.81 Rp 210,000.00
M3 0.14 Rp 11,603,200.00
aan (D+E)
12.0168 M^3
Rp 571,500.00
Rp 30,250.00
Rp 222,750.00
Rp 169,698.20
Rp 44,955.00
Rp 47,700.00
Rp 1,086,853.20
Rp 1,590,240.00
Rp 59,520.00
Rp 4,320.00
Rp 327,810.00
Rp 65,700.00
Rp 573,552.00
Rp 155,952.00
Rp 170,100.00
Rp 1,624,448.00
Rp 288,120.00
Rp 448,000.00
Rp 5,307,762.00
Rp 6,394,615.20
Project Simprug Suits Parcel-1
DIMENSIONS (m)
N
M
LANTAI 2
A TENAGA
B BAHAN
Paku 5 cm 12cm kg 4
Kerikil m3 0.81
C PERALATAN
D Jumlah (A+B+C)
Overhead
E & Profit (Contoh 15%) 15% x D
Harga
F Satuan Pekerjaan (D+E)
4.25 4
2.15 4
2.4 4
10.5 4
5.075 4
M3 4.25 4
2nd FLOOR
4.25 4
3.725 4
3.725 4
3.725 4
1.65 4
1.65 4
2.45 4
2.45 4
2.45 4
1.35 4
1.3 4
5.25 4
10.55 4
4.7 4
0.5 4
1.3 4
TOTAL AREA
Rp 90,000.00 Rp 634,500.00
Rp 110,000.00 Rp 30,250.00
Rp 135,000.00 Rp 222,750.00
Rp 121,213.00 Rp 254,547.30
Rp 135,000.00 Rp 54,405.00
Rp 150,000.00 Rp 52,950.00
Rp 4,969,500.00 Rp 1,987,800.00
Rp 18,600.00 Rp 74,400.00
Rp 2,700.00 Rp 5,400.00
Rp 1,561.00 Rp 491,715.00
Rp 21,900.00 Rp 98,550.00
Rp 1,707.00 Rp 573,552.00
Rp 288,800.00 Rp 155,952.00
Rp 210,000.00 Rp 170,100.00
Rp 11,603,200.00 Rp 1,740,480.00
Rp 102,900.00 Rp 360,150.00
Rp 28,000.00 Rp 560,000.00
ARGA ALAT
Rp 7,467,501.30
Rp 33,744,144.87
Rp 24,444,463.26
TOTAL AREA
notes
BALOK VOLUME
(m^2)
8.6 B5 4.988
9.6 B3 0.918
42 B6 2.245
17 B8A 2.8725
17 B2 0.225
14.9 B4 1.584
14.9 B1 0.22125
6.6 B7 1.89
9.8 B8 2.7375
9.8 B9 1.7875
5.4
21
42.2
18.8
2
5.2
318.6
BALOK LANTAI1
A TENAGA
Pekerja L.01 OH
Mandor L.04 OH
B BAHAN
Paku 5 cm 12cm kg
Kawat beton kg
Semen Portland kg
Pasir Beton m3
Kerikil m3
C PERALATAN
D Jumlah (A+B+C)
Overhead
E & Profit (Contoh 15%)
Harga
F Satuan Pekerjaan (D+E)
B1 0.9878
B2A 0.885
B3A 0.385
B2B 0.432
B5A 0.252
B4A 0.576
B2 1.164
B4 1.16
B6 0.9408
B5 1.14
B3 1.2285
BC 0.868
BA 0.432
BABI 0.392
TOTAL 10.8431
Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
3 Rp 21,900.00 Rp 65,700.00
16 Rp 28,000.00 Rp 448,000.00
Rp 6,394,615.20
15% x D
6394615.2 = Rp 148,508,543.40
3734000 86718416
A.4.1.1.31 Membuat 1 m3 ba
BALOK DAK
A TENAGA
Pekerja L.01 OH
Mandor L.04 OH
JUMLAH TENAGA K
B BAHAN
Paku 5 cm 12cm kg
Kawat beton kg
Semen Portland kg
Pasir Beton m3
Kerikil m3
Plywood 9 mm Lbr
C PERALATAN
JUMLAH HARGA A
D Jumlah (A+B+C)
Overhead
E & Profit (Contoh 15%)
Harga
F Satuan Pekerjaan (D+E)
3 Rp 21,900.00 Rp 65,700.00
16 Rp 28,000.00 Rp 448,000.00
JUMLAH HARGA BAHAN Rp 5,307,762.00
Rp 6,394,615.20
15% x D
= Rp 69,337,452.08
Project Simprug Suits Parcel-1
DIMENSIONS (m)
N
M
GROUND FLOOR
A TENAGA
Pekerja L.01 OH
Mandor L.04 OH
B BAHAN
Paku 5 cm 12cm kg
Kawat beton kg
Semen Portland kg
Pasir Beton m3
Kerikil m3
Plywood 9 mm Lbr
C PERALATAN
D Jumlah (A+B+C)
Overhead
E & Profit (Contoh 15%)
Harga
F Satuan Pekerjaan (D+E)
2 3.4 6.8
8 3.4 27.2
4 18600 74400
2 2700 5400
20 28000 560000
JUMLAH HARGA BAHAN 6218099
7467501.3
15% x D
= Rp77,395,423.72
DIMENSIONS (m)
FLOOR
VOLUME
SLAP
LENGTH WIDTH AREA THICKNESS
SG1 0 0
SG2 0 0
SG3 0 0
SG4 0 0
SG5 0 0
SG6 0 0
SG7 0 0
SG8 0 0
SG9 0 0
SG10 0 0
SG11 0 0
SG12 0 0
SG13 0 0
SG14 0 0
SG15 0 0
SG16 0 0
POOR PONDASI VOLUME
P1' 2.85
P1 1.95
P2 1.69
P2A 0.4875
P3 0.6175
TOTAL 7.595
No Uraian Kode
A TENAGA
Pekerja L.01
Tukang batu L.02
Tukang kayu L.02
Tukang besi L.02
Kepala tukang L.03
Mandor L.04
B BAHAN
Kayu kelas III m
Paku 5 cm 12 cm kg
Minyak bekisting Liter
Besi beton polos kg
Kawat beton kg
Semen Portland kg
Pasir Beton m
Kerikil m
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
S1 0.3459
S3 1.8187
s4 (200X400) 3.832
S4 (350X200) 1.5278
S4A 5.466
S5 7.8574
S4B 0.28
TOTAL 21.1278
Rp 5,655,837.20
15% x D Rp 848,375.58
Rp 6,504,212.78
X Rp 6,504,212.78 = Rp 137,419,706.77
A.4.1.1.12 Membuat 1 m3 Beton Mutu fc' 31.2 Mpa (K350), Slump
No Uraian Kode
A TENAGA
Pekerja L.01
Tukang batu L.02
Kepala tukang L.03
Mandor L.04
B BAHAN
Semen Portland
Pasir Beton
Kerikil (maks 30 mm)
Air
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
1.2 Mpa (K350), Slump 12 +- 2) cm, w/c = 0.48 (200 kg besi + bekisting) POOR
kg 448 0
kg 667 0
kg 1000 0
liter 215 0
JUMLAH HARGA BAHAN 244952.365
244952.365
15% x D 36742.85475
281695.2198
DIMENSIONS (m) TOTAL
WALL AREA
WIDTH HEIGHT (m^2)
5.95 3.4 20.23
4.55 3.4 15.47
17.5 3.4 59.5
GROUND FLOOR
6.6 3.4 22.44
4.9 3.4 16.66
3.725 3.4 12.665
4.05 3.4 13.77
9.7 3.4 32.98
13.9 3.4 47.26
1.784 3.4 6.0656
4.492 3.4 15.2728
2.282 3.4 7.7588
7.775 3.4 26.435
2.55 3.4 8.67
2 3.4 6.8
9.95 3.4 33.83
17.725 3.4 60.265
6.5 3.4 22.1
1.6 3.4 5.44
5.025 3.4 17.085
2.75 3.4 9.35
3.725 3.4 12.665
1.1 3.4 3.74
5.5 3.4 18.7
5.85 3.4 19.89
8 3.4 27.2
1.1 3.4 3.74
1.8 3.4 6.12
19.8 3.4 67.32
0.9 3.4 3.06
3.2 3.4 10.88
TOTAL AREA 633.3622
B BAHAN
Bata merah bh
Semen portlan Kg
Pasir pasang m3
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
WALL DIMENSIONS (m)
WIDTH HEIGHT
2nd FLOOR 4.25 4
2.15 4
2.4 4
10.5 4
5.075 4
4.25 4
4.25 4
3.725 4
3.725 4
3.725 4
1.65 4
1.65 4
2.45 4
2.45 4
2.45 4
1.35 4
1.3 4
5.25 4
10.55 4
4.7 4
0.5 4
1.3 4
TOTAL AREA
M2
70 Rp 650.00 Rp 45,500.00
9.68 Rp 1,707.00 Rp 16,523.76
0.045 Rp 283,500.00 Rp 12,757.50
JUMLAH HARGA BAHAN Rp 74,781.26
Rp 116,381.26
15% x D Rp 17,457.19
Rp 133,838.45
TOTAL AREnotes WALL DIMENSIONS (m)
WIDTH HEIGHT
17 special 3rd FLOOR 2.55 3.8
8.6 3.725 3.8
9.6 3.725 3.8
42 3.725 3.8
20.3 5.3 3.8
17 2.75 3.8
17 5.35 3.8
14.9 3.15 3.8
14.9 3.15 3.8
14.9 1.65 3.8
6.6 2.55 3.8
6.6 2.55 3.8
9.8 3.5 3.8
9.8 3.5 3.8
9.8 3.5 3.8
5.4 3.375 3.8
5.2 3.375 3.8
21 5.35 3.8
42.2 5.35 3.8
18.8 3.25 3.8
2 3.25 3.8
5.2 2.75 3.8
318.6 4 3.8
4.8 3.8
2 3.8
1.35 3.8
1.35 3.8
2.7 3.8
2.5 3.8
1.8 3.8
TOTAL VOLUME
TOTAL AREnotes
9.69
14.155
14.155
14.155
20.14
10.45
20.33
11.97
11.97
6.27
9.69
9.69
13.3
13.3
13.3
12.825
12.825
20.33
20.33
12.35
12.35
10.45
15.2
18.24
7.6
5.13
5.13
10.26
9.5
6.84
371.925
PLAFOND VOLUME
CI MEETING
C1 PEMBANTU
C1 D
C1 AS
C1 SK
C2 G
C2 GDG
C2 SLSR
Lantai Basement
Total
Lantai 1
Lantai 2
total
Total kesuluruhan
Harga Total
416,000
79,000
41,100
180,600
159,600
289,000
98,000
56,000
1,784,000
3,103,300
Harga Total
7,020,000
750,000
231,000
13,700
156,000
51,600
119,700
173,400
86,700
882,000
168,000
13,500,000
10,500,000
33,652,100
Harga Total
8,060,000
468,000
51,600
279,300
144,500
289,000
196,000
112,000
5,400,000
15,000,400
Rp 51,755,800
SIMPRUG S
SANITASI & IN
MASTE
No ITEM
1 BATHUB
2 BATHUB MIXER
3 CLOSET DUDUK
4 CLOSET MIXER
5 WASTAFEL
6 WASTAFEL MIXER
7 JET WASHER
8 HAND SHOWER
9 ROBE HOOK
10 TOWEL BAR
11 SOAP HOLDER
12 TISSUE HOLDER
13 FLOOR DRAIN
L
No ITEM
1 CLOSET DUDUK
2 WASTAFEL
3 WASTAFEL MIXER
4 JET WASHER
5 HAND SHOWER
6 ROBE HOOK
7 SOAP HOLDER
8 TISSUE HOLDER
9 FLOOR DRAIN
K
10 SINK
11 KITCHEN MIXER
No ITEM
1 Closet Duduk
2 Wastafel
3 Wastafel Mixer
4 JET WASHER
5 HAND SHOWER
6 ROBE HOOK
7 SOAP HOLDER
8 TISSUE HOLDER
9 FLOOR DRAIN
10 KITCHEN SINK
11 KITCHEN MIXER
No ITEM
1 BATHUB
2 BATHUB MIXER
3 CLOSET DUDUK
4 WASTAFEL
5 WASTAFEL MIXER
6 JET WASHER
7 HAND SHOWER
8 ROBE HOOK
9 TOWEL BAR
10 SOAP HOLDER
11 TISSUE HOLDER
12 FLOOR DRAIN
SIMPRUG SUITES PROJECT
TOTAL
LEVEL 1
Type PRICE/UNIT QTY
K-3384-KC2-0-EX. KOHLER 1
K-2215TX-0-EX. KOHLER 1
32.814 EX GROHE 1
22.94 EX. GROHE 1
28.961 EX. GROHE 1
27.802 IL EX. GROHE 1
22.94 EX. GROHE 1
27.394.000 EX. GROHE 1
32.816 EX. GROHE 1
40.364 EX. GROHE 1
1
40.367 EX. GROHE 1
K-RT7275T EX. KOHLER 1
KITCHEN
COMO5100 EX. MODENA 1
- 1
TOTAL
LEVEL 2
TOTAL
LEVEL 3
TOTAL
TOTAL PRICE
Rp 356,000.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
TOTAL PRICE
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
TOTAL PRICE
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
TOTAL PRICE
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
A.4.1.1.26 Pemasangan 1 m bekisting untuk tangga
A TENAGA
Pekerja L.01 OH
B BAHAN
Kayu kelas III m3
Paku 5 cm 12 cm kg
Minyak bekisting Liter
Balok kayu kelas II m3
Plywood tebal 9 mm Lbr
Dolken kayu,
Batang
cm,panj4 m
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %)
F Harga Satuan Pekerjaan (D+E)
Volume :
2 28000 56000
10.8725 m2
3.285 m2
4.482 m2
11.8944 m2
12.9981 m2
9.0545 m2
22.95 m2
18.225 m2
93.7615 m2
Rp 35,887,636
A.4.1.1.8. Membuat 1 m beton mutu f = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
Harga
Satuan
Uraian Kode Satuan Koefisien
(Rp)
TENAGA
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %) 15% x D
Harga Satuan Pekerjaan (D+E)
Volume :
Total =
Total =
Jumlah
Harga
(Rp)
148500
30250
3780
12450
524160
103800
108056
709.5
931705.5
139755.825
Rp 1,071,461
54000 mm2
529200000 mm3
259200000 mm3
203962500 mm3
264600000 mm3
369337500 mm3
330750000 mm3
27000 mm2
496125000 mm3
2453175000 mm3
2.453175 m3
54330 mm2
56550 mm2
4.4624 m3
27165 mm2
28275 mm2
2.3675 mm3
6.8299 m3
9.283075 m3
Rp 9,946,455.84
A.4.1.1.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
No Uraian Kode
A TENAGA
Pekerja L.01
Tukang batu L.02
Tukang kayu L.02
Tukang besi L.02
Kepala tukang L.03
Mandor L.04
B BAHAN
Kayu kelas III m
Paku 5 cm 12 cm kg
Minyak bekisting Liter
Besi beton polos kg
Kawat beton kg
Semen Portland kg
Pasir Beton m
Kerikil m
Kayu kelas II balok m
Plywood 9 mm Lembar
Dolken kayu cm, panjang 4 m Batang
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
Total =
O
5.300 90000
H
O
0.275 110000
H
O
1.300 135000
H
O
1.050 121213
H
O
0.265 135000
H
O
0.265 150000
H
JUMLAH TENAGA KERJA
3 0.32 2700000
3.20 14500
1.60 2500
157.50 14500
2.25 21900
336.00 1365
3 0.54 288600
3 0.81 205000
3 0.12 2800000
2.80 98000
Batang 32 28000
JUMLAH HARGA BAHAN
15% x D
19.0119 m3
19.4021 m3
16.0144 m3
14.6042 m3
69.0326 m3
Rp 507,258,882.79
Jumlah
Harga
(Rp)
477000
175500
127273.65
35775
39750
864000
46400
4000
2283750
49275
458640
155844
166050
336000
274400
896000
6389657.65
958448.6475
Rp 7,348,106.30
A.4.6.1.1. Pembuatan dan pemasangan 1m3 kusen pintu , kayu kelas 1
A TENAGA
Pekerja L.01 OH 7
Tukang kayu L.03 OH 21
Kepala tukang L.03 OH 2.1
Mandor L.04 OH 0.35
JUMLAH TENAGA KERJA
B BAHAN
m
Balok kayu 3 1.10
Paku 10 cm Kg 1.25
Lem kayu Kg 1
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
Volume kusen lt 1 PU
P4*2
P5
P6
Harga Jumlah
Satuan Harga No Uraian Kode
(R
(Rp)
p)
A TENAGA
90,000 630,000 Pekerja L.01
135,000 2,835,000 Tukang kayu L.03
135,000 283,500 Kepala tukang L.03
150,000 52,500 Mandor L.04
AH TENAGA KERJA
B BAHAN
21,762,500 23,938,750 Balok kayu
18,600 23,250 Paku 10 cm
30,300 30,300 Lem kayu
AH HARGA BAHAN
C PERALATAN
LAH HARGA ALAT
0.034
0.0304 0.0608
0.0304
0.03768
Volume kusen lt 2
0.0304 0.0912
0.0304 0.0608
0.03456
0.02505
harga sat pekerjaan
* 31962295 Total Harga pekerjaan kusen kayu
Harga Jumlah
Satuan Koefisien Satuan Harga
(Rp) (Rp)
OH 7 90,000 630,000
OH 21 135,000 2,835,000
OH 2.1 135,000 283,500
OH 0.35 150,000 52,500
JUMLAH TENAGA KERJA
m
3 1.10 21,762,500 23,938,750
Kg 1.25 18,600 23,250
Kg 1 30,300 30,300
JUMLAH HARGA BAHAN
27,793,300
toh 15%) 15% x D 4,168,995
rjaan (D+E) 31,962,295
ent M3 J1 0.01392
J2 0.00576
J3 0.03
KS1 0.030105
KS2
J4 0.00608
J5 0.0184
J6 0.02432
J7
S13 0.0132768
J8 0.0168
J9 0.02248
J9' 0.0104
J10 0.01768
J11*2 0.012064 0.024128
J12 0.01888
an kusen kayu = Vol * harga sat pekerjaan
= 0.2522298 * 31962295
= Rp 8,061,843
pengerjaan kaca
LANTAI BASEMENT
TOTAL 15.90526 No
A
LANTAI 1
J5 1 7.3556 7.3556
J6 1 5.9976 5.9976 B
J7 1 6.7005 6.7005
TOTAL 21.0626
LANTAI 2 C
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%) 15% x D
Harga Satuan Pekerjaan (D+E)
No
90000 1350
135000 20250 B
135000 2025
150000 120
JUMLAH TENAGA KERJA 23745
C
210000 231000
75000 3750
JUMLAH HARGA BAHAN 234750 D
E
F
JUMLAH HARGA ALAT
258495
15% x D
Total Harga pekerjaan PINTU
4.6.1.4. Pembuatan dan pemasangan 1 m pintu klamp sederhana, kayu kelas III
TENAGA
Pekerja L.01 OH 0.35
Tukang kayu L.03 OH 1.05
Kepala tukang L.03 OH 0.11
Mandor L.04 OH 0.02
JUMLAH TENAGA KE
BAHAN
Papan Kayu m 3 0.04
Lem kayu Kg 0.50
JUMLAH HARGA BAH
PERALATAN
JUMLAH HARGA AL
Jumlah (A+B+C)
Overhead & Profit (Contoh 15%) 15% x D
Harga Satuan Pekerjaan (D+E)
Luas kusen lt 1 PU
P4*2
P5
P6
90,000.00 31,500.00
135,000.00 141,750.00
135,000.00 14,175.00
150,000.00 2,700.00
JUMLAH TENAGA KERJA
2,700,000.00 108,000.00
25,000.00 12,500.00
JUMLAH HARGA BAHAN
310,625.00
46,593.75
357,218.75
1.848 3.696
2.1
1.47
2.6105
6.423
11.13
5.915
2.288 4.576
2.288
10.794
2.288 6.864
2.288 4.576
8.7894
1.6605
ga sat pekerjaan
* 31962295
A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan
N
Uraian Kode
o
A TENAGA
Pekerja L.01
Mandor L.04
B BAHAN
Dolken kayu diameter
8-10/400 cm
Kayu
Paku biasa
Semen Portland
Pasir beton
Koral beton
Seng gelombang
Seng plat
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %)
F Harga Satuan Pekerjaan (D+E)
an peralatan A. 2.2.1.8
Jum
Harga lah
Koefisi Satuan
Satuan No
en Harga
(Rp)
(Rp)
A
O
H 1 90000 90000
O
H 2 135000 270000
O
H 0.2 135000 27000
O
H 0.05 150000 7500
B
Bat
1.7 28000 47600
ang
K
g 0.3 18600 5580
K
g 10.5 1366 14343
557957 D
15% x D 83693.55 E
641650.55 F
A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja
Kod
Uraian Satuan Koefisien
e
TENAGA
Pekerja L.01 OH 1
BAHAN
Dolken kayu diameter
Batang 1.25
8-10/400 cm
Kayu m3 0.186
Semen Portland Kg 18
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %) 15% x D
Harga Satuan Pekerjaan (D+E)
volume
Jumlah
Harga Satuan
No
Harga
(Rp)
(Rp)
A
90000 90000
135000 270000
135000 27000
150000 7500 B
H TENAGA KERJA
C
28000 35000
47000 8742
18600 5580 D
1366 24588 E
288800 8664 F
230000 11500
37800 56700
41000 55350
H HARGA BAHAN
H HARGA ALAT
600624
90093.6
690717.6
1 m2 = Rp 641,651
12 m2 = Rp 7,699,807
1 m2 = Rp 690,718
20 m2 = Rp 13,814,352
1 m2 = Rp 18,975
79.18 m = Rp 1,502,441
1 m2 = Rp 56,985
79,18 m = Rp 4,512,056
1m2 = Rp 138,888
83.18m = Rp 11,552,687
= Rp 39,081,343
A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan
Harga Satuan
Uraian Kode Satuan Koefisien
(Rp)
TENAGA
BAHAN
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
Jumlah
No Uraian Kode Satuan
Harga
(Rp)
A TENAGA
Mandor L.04 OH
JUMLAH
B BAHAN
Kayu balok
m
5/7
Paku 2-3 Kg
Kayu
m
papan 3/20
16500
PERALATA
2475 C
N
18975
D Jumlah (A+B+C)
han lapangan
emasangan 1 m Bouwplank
Juml
Harga ah
Koefisi Satuan
Satuan
en Harga
(Rp)
(Rp)
49552
h 15 %) 15% x D 7432.8
(D+E) 56984.8
A. 2.2.1.1 Pembuatan 1 m pagar sementara dari kayu tinggi 2 meter
A TENAGA
B BAHAN
Dolken
kayu
Batang 1.25
8-10/400 cm
Semen portland Kg 5
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
gi 2 meter
Juml
Harga Satuan ah
Harga
(Rp)
(Rp)
90000 36000
135000 27000
135000 2700
150000 3000
TENAGA KERJA
28000 35000
1366 6830
28800 144
230000 2070
47000 3384
23400 1404
8100 3240
HARGA BAHAN
HARGA ALAT
120772
18115.8
138887.8
A. 4.4.1.3. Pemasangan 1 m2 Plesteran 1 SP:3PP Tebal 15 mm
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.150
Kepala
L.03 OH 0.015
tukang
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC bh 7.776
PP Kg 0.023
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH
Tukang Batu L.03 OH
Kepala
L.03 OH
tukang
Mandor L.04 OH
B BAHAN
PC bh
PP Kg
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
Volume Lt.2 : 414.5172
total= 90,234,507
A. 4.4.1.3. Pemasangan 1 m2 Plesteran 1 SP:3PP Tebal 15 mm
Harga Jumlah
Satuan Harga No Uraian Kode
(Rp) (Rp)
A TENAGA
90,000 8,379,288 Pekerja L.01
110,000 5,120,676 Tukang Batu L.03
135,000 628,447 Kepala tukang L.03
150,000 698,274 Mandor L.04
LAH TENAGA KERJA 14,826,685
B BAHAN
1,365 3,294,066 PC
283,500 2,023,598 PP
LAH HARGA BAHAN 5,317,664
C PERALATAN
MLAH HARGA ALAT
m2 Volume Lt.1 :
Harga Jumlah
Koefisien Satuan Harga
(Rp) (Rp)
135,000 839,397
0.015
0.015 150,000 932,664
JUMLAH TENAGA KERJA 19,803,559
26,906,204
15% x D 4,035,931
30,942,134
m2
n 1 SP:3PP Tebal 15 mm
Harga Jumlah
Satuan Koefisien Satuan Harga
(Rp) (Rp)
31,414,237
15% x D 4,712,136
D+E) 36,126,373
483.968 m2
A. 4.4.1.3. Pemasangan 1 m2 Dinding Bata Merah (5x11x22)cm Tabel 1 Campuran 1 SP : 4 PP
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000
Semen
Kg 14.370
portlan
Pasir pasang m3 0.040
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000
Semen
Kg 14.370
portlan
Pasir pasang Kg 0.040
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
Volume Lt.2 : 414.5172
Harga Jumlah
Satuan Harga No Uraian
(Rp) (Rp)
A TENAGA
90,000 27,000 Pekerja
110,000 11,000 Tukang Batu
135,000 1,350 Kepala tukang
150,000 2,250 Mandor
JUMLAH TENAGA KERJA 41,600
B BAHAN
650 45,500 Bata merah
1,707 24,530 Semen portlan
283,500 11,340 Pasir pasang
JUMLAH HARGA BAHAN 81,370
C PERALATAN
JUMLAH HARGA ALAT
m2 Volume Lt.1 :
Tabel 1 Campuran 1 SP : 4 PP
Harga Jumlah
Satuan Harga
(Rp) (Rp)
90,000 11,191,964
110,000 4,559,689
135,000 559,598
150,000 932,664
JUMLAH TENAGA KERJA 17,243,916
650 18,860,533
1,707 10,167,937
283,500 4,700,625
JUMLAH HARGA BAHAN 33,729,095
50,973,010
D 7,645,952
58,618,962
m2
an 1 m2 Dinding Bata Merah (5x11x22)cm Tabel 1 Campuran 1 SP : 4 PP
Harga Jumlah
Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
b
h
70.000 650 22,020,544
Kg 14.370 1,707 11,871,537
m3 0.040 283,500 5,488,197
JUMLAH HARGA BAHAN 39,380,278
59,513,347
ontoh 15%) 15% x D 8,927,002
kerjaan (D+E) 68,440,349
483.968 m2
KOLOM
volum Lt. 1
(k2+ K2+ K2+ K1+ K2+ K5+ K10+ 2K2a+ 2K2a+ 2K3+ C3+ K4+ K2+ 2K2+ K6+ K3+ K3+ K5+ 2K3+
2K3+ K3+ K3+ 2K3a+ C2+ K1) x 396
= 7,319,268 cm^3
= 7.32 m^3
volum Lt. 2
(k1 x 11 + k2 x 6 + k3 x 2 + k4 + k5 x 2 + 2k1 x 2 + 2k1a x 3 + 2k2a x 3 + c1 + Kp) x 396
= 4,992,372 cm^3
= 4.99 m^3
KOLOM
BASEMENT
A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
A TENAGA
Pekerja L.01 OH 7.050
Tukang batu L.02 OH 0.275
Tukang kayu L.02 OH 1.650
Tukang besi L.02 OH 2.100
Kepala tukang L.03 OH 0.403
Mandor L.04 OH 0.353
JUMLAH
TENAGA
KERJA
B BAHAN
Kayu kelas III m3 0.400
Paku 5 cm
kg 4.000
12cm
Minyak
Liter 2.000
bekisting
Besi beton
kg 315.000
polos
Kawat beton kg 4.500
Semen
kg 336.000
Portland
Pasir Beton m3 0.540
Kerikil m3 0.810
Kayu kelas II
M3 0.150
balok
Plywood 9
Lbr 3.500
mm
Dolken kayu
(8-10) cm, Batang 20.000
panj 4 m
JUMLAH
HARGA
BAHAN
C PERALATAN
JUMLAH
HARGA ALAT
Jumlah
D
(A+B+C)
Overhead &
E Profit (Contoh 15% x D
Harga Satuan
15%)
F Pekerjaan
(D+E)
VOLUM
KOLOM 7.27 m^3
BASEMENT =
otal harga= 7.27 x 7,467,501 =
KOLOM
LANTAI 1
A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
A TENAGA
Pekerja L.01 OH 7.050
Tukang batu L.02 OH 0.275
Tukang kayu L.02 OH 1.650
Tukang besi L.02 OH 2.100
Kepala tukang L.03 OH 0.403
Mandor L.04 OH 0.353
JUMLAH
TENAGA
KERJA
B BAHAN
Kayu kelas III m3 0.400
Paku 5 cm
kg 4.000
12cm
Minyak
Liter 2.000
bekisting
Besi beton
kg 315.000
polos
Kawat beton kg 4.500
Semen
kg 336.000
Portland
Pasir Beton m3 0.540
Kerikil m3 0.810
Kayu kelas II
M3 0.150
balok
Plywood 9
Lbr 3.500
mm
Dolken kayu
(8-10) cm, Batang 20.000
panj 4 m
JUMLAH
HARGA
BAHAN
C PERALATAN
JUMLAH
HARGA ALAT
Jumlah
D
(A+B+C)
Overhead &
E Profit (Contoh 15% x D
Harga Satuan
15%)
F Pekerjaan
(D+E)
VOLUM
KOLOM 7.32 m^3
LANTAI 1 =
otal harga= 7.32 x 7,467,501 =
KOLOM
LANTAI 2
A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
A TENAGA
Pekerja L.01 OH 7.050
Tukang batu L.02 OH 0.275
Tukang kayu L.02 OH 1.650
Tukang besi L.02 OH 2.100
Kepala tukang L.03 OH 0.403
Mandor L.04 OH 0.353
JUMLAH
TENAGA
KERJA
B BAHAN
Kayu kelas III m3 0.400
Paku 5 cm
kg 4.000
12cm
Minyak
Liter 2.000
bekisting
Besi beton
kg 315.000
polos
Kawat beton kg 4.500
Semen
kg 336.000
Portland
Pasir Beton m3 0.540
Kerikil m3 0.810
Kayu kelas II
M3 0.150
balok
Plywood 9
Lbr 3.500
mm
Dolken kayu
(8-10) cm, Batang 20.000
panj 4 m
JUMLAH
HARGA
BAHAN
C PERALATAN
JUMLAH
HARGA ALAT
Jumlah
D
(A+B+C)
Overhead &
E Profit (Contoh 15% x D
Harga Satuan
15%)
F Pekerjaan
(D+E)
VOLUM
KOLOM 4.99 m^3
LANTAI 2 =
otal harga= 4.99 x 7,467,501 =
c1 + Kp) x 396
Jumlah
Harga Satuan (Rp)
Harga (Rp)
90,000 634,500
110,000 30,250
135,000 222,750
121,213 254,547
135,000 54,405
150,000 52,950
1,249,402
4,969,500 1,987,800
18,600 74,400
2,700 5,400
1,561 491,715
21,900 98,550
1,707 573,552
288,800 155,952
210,000 170,100
11,603,200 1,740,480
102,900 360,150
28,000 560,000
6,218,099
7,467,501
Rp54,268,064
Jumlah
Harga Satuan (Rp)
Harga (Rp)
90,000 634,500
110,000 30,250
135,000 222,750
121,213 254,547
135,000 54,405
150,000 52,950
1,249,402
4,969,500 1,987,800
18,600 74,400
2,700 5,400
1,561 491,715
21,900 98,550
1,707 573,552
288,800 155,952
210,000 170,100
11,603,200 1,740,480
102,900 360,150
28,000 560,000
6,218,099
7,467,501
Rp54,656,643
Jumlah
Harga Satuan (Rp)
Harga (Rp)
90,000 634,500
110,000 30,250
135,000 222,750
121,213 254,547
135,000 54,405
150,000 52,950
1,249,402
4,969,500 1,987,800
18,600 74,400
2,700 5,400
1,561 491,715
21,900 98,550
1,707 573,552
288,800 155,952
210,000 170,100
11,603,200 1,740,480
102,900 360,150
28,000 560,000
6,218,099
7,467,501
Rp37,280,544
SLOOF
A TENAGA
Pekerja L.01 OH
Tukang batu L.02 OH
Tukang kayu L.02 OH
Tukang besi L.02 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
Kayu kelas III m3
Paku 5 cm 12 cm kg
Kawat beton kg
Semen Portland kg
Pasir Beton m3
Kerikil m3
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
BALOK LANTAI1
A TENAGA
Pekerja L.01 OH
Tukang batu L.02 OH
Tukang kayu L.02 OH
Tukang besi L.02 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
Kayu kelas III m3
Paku 5 cm 12cm kg
Plywood 9 mm Lbr
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
BALOK LANTAI 2
A TENAGA
Pekerja L.01 OH
Tukang batu L.02 OH
Tukang kayu L.02 OH
Tukang besi L.02 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
Kayu kelas III m3
Paku 5 cm 12cm kg
Plywood 9 mm Lbr
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
RING BALOK
A TENAGA
Pekerja L.01 OH
Tukang batu L.02 OH
Tukang kayu L.02 OH
Tukang besi L.02 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
Kayu kelas III m3
Paku 5 cm 12 cm kg
Kawat beton kg
Semen Portland kg
Pasir Beton m3
Kerikil m3
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
= Rp85,233,432
= Rp114,290,957
= Rp79,188,996
= Rp882,507
PEKERJAAN TANAH
Penggalian tanah sedalam 3m = 244.35m2 x 3m
A TENAGA
Pekerja L.01 OH 1
Mandor L.04 OH 0.067
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.50
Mandor L.04 OH 0.05
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
VOLUM URUGAN= 79.146 m3
Total harga = Rp4,155,165
= 733.05 m3
26.382 x 3 m
= 79.146 m3
90,000 94,500
150,000 10,050
MLAH TENAGA KERJA 104,550
104,550
15% x D
90,000 45,000
150,000 7,500
MLAH TENAGA KERJA 52,500
52,500
15% x D
A.4.5.2.3. pemasangan 1m2 atap genteng palentong besar/super
1. pasang kuda-kuda dan gording (borneo)
A TENAGA
Pekerja L.01 OH
Tukang kayu L.03 OH
Mandor L.04 OH
B BAHAN
Balok kayu M 3
Paku 10 cm Kg
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
luas atap
potongan 1 = 2 x (a x t / 2) =
potongan 2 =
= 2 x (a x t / 2) =
A TENAGA
Pekerja L.01 OH
Tukang kayu L.03 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
Genteng Beton Lembar
NOK Lembar
Pasir M3
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH
Tukang kayu L.03 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
Papan Kamper Lembar
Paku KG
List M'
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH
Tukang kayu L.03 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
Kaso Lembar
Paku KG
Eternite M'
Papan Kamper M'
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
da dan gording (borneo)
volume Harga Jumlah
Harg
Koefisien satuan Satuan
a
m2 (Rp) (Rp)
18,591,446
15% x D 2,788,717
21,380,163
143.2747
158.7141 m 2
24,212,146
15% x D 3,631,822
27,843,968
11,044,474
15% x D 1,656,671
12,701,145
16,282,038
15% x D 2,442,306
18,724,344
2. pasang usuk dan Reng (borneo), Besi Kuda-Kuda dan Baut
Koefisie
No Uraian Kode Satuan
n
A TENAGA
Pekerja L.01 OH ###
Tukang kayu L.03 OH 0.17
Kepala
L.03 OH ###
tukang
Mandor L.04 OH ###
JUMLAH HARGA PEKER
B BAHAN
kaso 5/7 M 0
Reng 3/4 Buah 0
Paku Tube 0.3
Besi Kuda-kuda M 2.00
Baut Mur Buah 0.30
JUMLAH HARGA BAHA
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
Rp 93,104,818
Besi Kuda-Kuda dan Baut Mur
Har
volume Jumlah
ga
Sat
satuan Harga
uan
m2 (Rp) (Rp)
10,830,607.12
5% x D 1,624,591.07
12,455,198.19
Pondasi tiang pancang
P1 = 26 PILECAP
P1A = 2 PILECAP
P1B = 2 PILECAP
P2' = 6 PILECAP
P2B = 4 PILECAP
TOTAL = 40 PILECAP
TOTAL TIANG= 50 TIANG
BIAYA :
tiang pancang 25 x25 , 6m = Rp150,000
50 TIANG x 6m x Rp132,000 = Rp45,000,000
Pancang = Rp55,000/m
total tiang x 6m x 55000 =
PILECAP
volum penggalian tanah untuk pilecap =
A.2.3.1.1. Menggali 1 m3 tanah biasa sedalam 1 m
A TENAGA
Pekerja L.01 OH 0.750
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
A TENAGA
Pekerja L.01 OH 0.50
Mandor L.04 OH 0.05
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
PASIR URUG
volum pasir urug= 2.62225 m3
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.30
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
pasir urug m3 1.2
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
volum pasir urug= 2.62225 m3
total harga= Rp1,111,847
A.A.4.1.1.4 Membuat 1m3 lantai kerja beton mutu f'c = 7.4 Mpa (K 100), slump (3-6) cm, w/c = 0.87
A TENAGA
Pekerja L.01 OH 1.20
Tukang Batu L.02 OH 0.2
Kepala Tukang L.03 OH 0.02
Mandor L.04 OH 0.06
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 230
Pasir Beton kg 893
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
B BAHAN
Kayu kelas III m3
Paku 5 cm 12 cm kg
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
volum pondasi= 12.8466 m3
total harga= Rp45,838,906
A TENAGA
Pekerja L.01 OH 0.50
Mandor L.04 OH 0.05
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
= 1 TITIK PANCANG
= 1 TITIK PANCANG
= 1 TITIK PANCANG
= 2 TITIK PANCANG
= 2 TITIK PANCANG
7 TITIK PANCANG
/m
Rp12,000,000
Rp16,500,000
26.2225 m3
90,000 67,500
150,000 3,750
MLAH TENAGA KERJA 71,250
71,250
15% x D 10687.5
81,938
Harga satuan (Rp) Jumlah Harga (Rp)
90,000 45,000
150,000 7,500
JUMLAH TENAGA KERJA 52,500
52,500
15% x D 7875
60,375
90,000 27,000
150,000 1,500
JUMLAH TENAGA KERJA 28,500
283,500 340,200
JUMLAH HARGA BAHAN 340,200
368,700
15% x D 55305
424,005
Harga satuan (Rp) Jumlah Harga (Rp)
90,000 108,000
150,000 30,000
1,707 392,610
206 183,958
155 159,185
15 3,000
JUMLAH HARGA BAHAN 738,753
876,753
15% x D 131512.95
1,008,266
90,000 45,000
150,000 7,500
JUMLAH TENAGA KERJA 52,500
52,500
15% x D 7875
60,375
GALIAN
PEMADATAN
PASIR URUG
LT KERJA
PILE CAP
URUG TANAH KEMBALI
TIANG PANCANG
No
A.
1
2
3
4
5
6
7
B
1
2
3
4
5
6
7
8
9
C
1
D
1
E
1
F
1
G
1
H
1
2
I
1
J
1
2
3
4
5
K
1
2
N
1
2
O
1
2
3
4
P
1
Q
1
2
Jenis Pekerjaan
PEKERJAAN PERSIAPAN
Pembersihan 1 m2 lapangan dan perataan
Pengukuran dan pemasangan 1 m Bouwplank
Menggali 1 m3 tanah biasa sedalam 3 m
Pengurugan kembali 1 m3 galian tanah
Pembuatan 1 m2 gudang semen dan peralatan
Pembuatan 1 m2 bedeng pekerja
Pembuatan 1 m pagar sementara dari kayu tinggi 2 meter
PONDASI
tiang pancang 25 x25 , 6m
mobilisasi dan demobilisasi HYDRAULIC JACK 80 TON =
Pancang
Menggali 1 m3 tanah biasa sedalam 1 m
Pemadatan Tanah 1m3 tanah (per 20 cm)
PASIR URUG
Lantai kerja beton
PONDASI BETON BERTULANG (PILE CAP)
Pengurugan kembali 1 m galian tanah
SLOOF
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
KOLOM
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
BALOK
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
PLAT LANTAI
Membuat 1 m3 PLAT beton bertulang (150 kg besi + bekisting)
DINDING
Pemasangan 1 m2 Dinding Bata Merah (5x11x22)cm Tabel 1
Campuran 1 SP : 4 PP
TANGGA
pemasangan 1 m3 tangga pengecoran beton
pemasangan 1m2 bekisting tangga
RING BALOK
Membuat 1 m3 ring balok beton bertulang (10 x 15) cm
ATAP
Pemasangan kuda-kuda dan gording (borneo)
Pemasangan usuk dan Reng (borneo), Besi Kuda-Kuda dan Baut Mur
Pemasangan Genteng dan Pemasangan Bubungan
Pemasangan List plank
Pemasangan Plaford, Rangka dan Jelusi dari Kayu Kamper
JENDELA
Pembuatan dan pemasangan 1m3 kusen jendela, kayu kelas 1
Pemasangan 1 m2 kaca tebal 5 mm
INSTALASI
SANITASI
PINTU
Pembuatan dan pemasangan 1m3 kusen pintu , kayu kelas 1
Pembuatan dan pemasangan 1 m pintu klamp sederhana
PENUTUP LANTAI
Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm
Pemasangan 1 m2 lantai parquet kayu
PLADFOND
Pemasangan 1 m2 langit-langit gypsum board
CAT
Pengecatan 1m2 tembok baru ( 1lapis plamuur, 1 lapis cat
dasar, 2 lapis cat penutup)
1m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis
cat dasar, 2 lapis cat penutup)
Satuan Volume Harga Satuan
m2 79.18 Rp18,975
m2 79,18 Rp56,985
m3 733.05 Rp104,550
m3 79.146 Rp52,500
m2 12 Rp641,651
m2 20 Rp690,718
m2 83.18 Rp138,888
unit 50 Rp150,000
unit 1 Rp12,000,000
m 300 Rp55,000
m3 26.2225 Rp81,938
m3 4.4129 60,375
m3 2.62225 Rp424,005
m3 1.3111 Rp1,008,266
m3 12.8466 Rp3,568,174
m3 8.7408 Rp60,375
m3 23.1688 Rp4,258,892
m3 19.58 Rp7,467,501
m3 30.25678 Rp6,394,615
m3 69.0326 Rp7,348,106
m2 1208.8292 Rp122,970
m3 9.283075 Rp1.071.461
m2 93.7615 Rp382,754
m3 10.8223 Rp81,545
m2 134.833 Rp21,380,163
m2 134.833 Rp12,455,198
m2 134.833 Rp27,843,968
m2 134.833 Rp12,701,145
m2 134.833 Rp18,724,344
m3 0.2522298 Rp8,061,843
m2 44.19241 Rp11,423,517
Rp38,133,895
Rp43,411,283
m3 1.19309 Rp51,755,800
m2 72.8924 Rp26,038,532
m2 233.26844 Rp119,279
m2 159.075 Rp121,764
m2 61.03464 Rp194,811
m2 18.62 Rp392,475
m2 471.99808 Rp35,301,303
m2 1208.8292 Rp25,266
m2 471.99808 Rp47,378
RENCANA ANGGARAN BIAYA RUMAH TINGGAL
JENIS PEKERJAAN TOTAL HARGA
A Persiapan lahan = Rp39,081,343
B Pondasi = Rp124,715,452
C Sloof = Rp85,233,432
D Kolom = Rp146,205,252
E Balok = Rp193,479,954
F Plat Lantai = Rp507,258,883
G Dinding = Rp261,181,123
H tangga = Rp35,887,636
I ring balok = Rp882,507
J Atap = Rp93,104,818
K Instalasi = Rp51,755,800
L Sanitasi = Rp43,411,283
M pintu = Rp64,172,427
N jendela = Rp19,485,360
O penutup lantai = Rp66,391,789
P pladfond = Rp35,301,303
Q cat = Rp22,362,325
total= Rp1,789,910,687
PLADFOND
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
90,000 9,000
135,000 6,750
135,000 675
150,000 750
JUMLAH TENAGA KERJA 17,175
131,300 47,793
89,300 9,823
JUMLAH HARGA BAHAN 57,616
74,791
15% x D
E)
A.4.4.3.13.Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Kepala tukang L.03 OH
Mandor L.04 OH
JUMLAH TENAGA KER
B BAHAN
Semen Portlan kg
Semen warna Kg
Pasir pasang M3
JUMLAH HARGA BAH
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
Volum = 233.26844
Total harga = 233.26844 x 119,279 =
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
Volum = 159.075
Total harga = 159.075 x 121,764 =
A TENAGA
Pekerja L.01 OH
Tukang Batu L.02 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
Ubin keramik Bh
Semen Portland Kg
Pasir pasang M3
Semen warna Kg
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
Volum = 61.03464
Total harga = 61.03464 x 194,811 =
A.4.4.3.46.Pemasangan 1 m2 lantai parquet kayu
A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH
Kepala tukang L.03 OH
Mandor L.04 OH
B BAHAN
Parquet m2
Lem Kg
C PERALATAN
D Jumlah (A+B+C)
Harga Satuan
F
Pekerjaan (D+E)
Volum = 18.62
Total harga = 18.62 x 392,475 =
3.1
11,666 36,165
9.6 1,707 16,387
1.5 10,500 15,750
0.045 283,500 12,758
JUMLAH HARGA BAHAN 81,059
119,279
15% x D
Rp27,824,096.24
Harga Jumlah
Koefisien Satuan Harga
(Rp) (Rp)
6.63
5,833 38,673
9.8 1,707 16,729
1.3 10,500 13,650
0.045 283,500 12,758
JUMLAH HARGA BAHAN 81,809
121,764
15% x D
Rp19,369,590.80
Harga Jumlah
Koefisien Satuan Harga
(Rp) (Rp)
194,811
15% x D
Rp11,890,217.42
Harga Jumlah
Koefisien Satuan Harga
(Rp) (Rp)
392,475
15% x D
Rp7,307,884.50
CAT
cat dinding
bok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01 OH 0.02
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.0063
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.1
Cat dasar Kg 0.1
Cat penutup Kg 0.26
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
Cat Gypsum
A.4.7.1.4 1m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis
A TENAGA
Pekerja L.01 OH 0.07
Tukang cat L.02 OH 0.009
Kepala
L.03 OH 0.006
tukang
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.2
Plamuur Kg 0.15
Cat dasar Kg 0.17
Kuas Bh 0.01
Pengencer Kg 0.03
Ampelas Lbr 0.2
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
90,000 1,800
135,000 8,505
135,000 851
150,000 450
MLAH TENAGA KERJA 11,606
10,000 1,000
44,700 4,470
31,500 8,190
MLAH HARGA BAHAN 13,660
25,266
15% x D
90,000 6,300
135,000 1,215
135,000 810
150,000 450
TENAGA KERJA 8,775
42,300 8,460
70,700 10,605
44,700 7,599
31,500 8,190
15,000 150
25,300 759
14,200 2,840
HARGA BAHAN 38,603
HARGA ALAT
47,378