No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1
1. Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 cm
= ( 1 : 0.12 : 0.12 ) = 69.44 m1
Besi 4 batang dia. 12 = 4 x 69,44 x 0,89 kg = 247.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg = 66.67 kg ( B )
2. Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 15 x 15 c = ( 1 : 0.15 : 0.15 ) = 44.44 m1
Besi 4 batang dia. 12 = 4 x 44,44 x 0,89 kg = 158.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg = 71.11 kg ( B )
3. Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 c= ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg = 118.67 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x = 155.56 kg ( B )
4. Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 c = ( 1 : 0.20 : 0.30 ) = 16.67 m1
Besi 4 batang dia. 12 = 4 x 16,67 x 0,89 kg = 89.00 kg ( A)
Besi 2 batang dia. 10 = 2 x 16.67 x 0.62 kg = 0.00 kg ( B)
Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X = 33.33 kg ( C )
6.00
1 60 x 30 x 10 x 1.6 x 6 mm 9.80 kg 1.63 kg
2 60 x 30 x 10 x 2.3 x 6 mm 13.90 kg 2.32 kg
3 75 x 35 x 15 x 1.6 x 6 mm 12.50 kg 2.08 kg
4 75 x 35 x 15 x 2.3 x 6 mm 17.40 kg 2.90 kg
5 75 x 45 x 15 x 1.6 x 6 mm 14.00 kg 2.33 kg
6 75 x 45 x 15 x 2.3 x 6 mm 19.00 kg 3.17 kg
7 100 x 50 x 20 x 2 x 6 mm 21.40 kg 3.57 kg
8 100 x 50 x 20 x 2.3 x 6 mm 24.40 kg 4.07 kg
9 100 x 50 x 20 x 3.2 x 6 mm 33.00 kg 5.50 kg
10 125 x 50 x 20 x 2 x 6 mm 23.70 kg 3.95 kg
11 125 x 50 x 20 x 2.3 x 6 mm 27.10 kg 4.52 kg
12 125 x 50 x 20 x 3.2 x 6 mm 37.00 kg 6.17 kg
13 150 x 50 x 20 x 2 x 6 mm 26.10 kg 4.35 kg
14 150 x 50 x 20 x 2.3 x 6 mm 29.76 kg 4.96 kg
15 150 x 50 x 20 x 3.2 x 6 mm 40.56 kg 6.76 kg
16 150 x 65 x 20 x 2 x 6 mm 28.92 kg 4.82 kg
17 150 x 65 x 20 x 2.3 x 6 mm 33.00 kg 5.50 kg
18 150 x 65 x 20 x 3.2 x 6 mm 45.10 kg 7.52 kg
19 200 x 75 x 20 x 2 x 6 mm 35.52 kg 5.92 kg
20 200 x 75 x 20 x 2.3 x 6 mm 40.62 kg 6.77 kg
21 200 x 75 x 20 x 3.2 x 6 mm 55.62 kg 9.27 kg
NO. UKURAN BESI KANAL " L " BERAT / BATANG BERAT PER 1 M1
1 25 x 25 x 3 x 6 mm 6.72 kg 1.12 kg
2 30 x 30 x 3 x 6 mm 8.16 kg 1.36 kg
3 40 x 40 x 3 x 6 mm 11.00 kg 1.83 kg
4 40 x 40 x 4 x 6 mm 14.50 kg 2.42 kg
5 50 x 50 x 4 x 6 mm 18.50 kg 3.08 kg
6 50 x 50 x 5 x 6 mm 22.60 kg 3.77 kg
7 60 x 60 x 5 x 6 mm 27.30 kg 4.55 kg
8 60 x 60 x 6 x 6 mm 32.52 kg 5.42 kg
9 65 x 65 x 6 x 6 mm 35.46 kg 5.91 kg
10 70 x 70 x 7 x 6 mm 44.28 kg 7.38 kg
11 75 x 75 x 6 x 6 mm 41.22 kg 6.87 kg
12 75 x 75 x 8 x 6 mm 54.18 kg 9.03 kg
13 80 x 80 x 8 x 6 mm 57.96 kg 9.66 kg
14 90 x 90 x 9 x 6 mm 73.20 kg 12.20 kg
15 100 x 100 x 8 x 6 mm 73.20 kg 12.20 kg
16 100 x 100 x 10 x 6 mm 90.60 kg 15.10 kg
17 120 x 120 x 10 x 12 mm 218.40 kg 36.40 kg
18 120 x 120 x 12 x 12 mm 260.00 kg 43.33 kg
19 125 x 125 x 12 x 12 mm 280.00 kg 46.67 kg
20 130 x 130 x 9 x 12 mm 214.20 kg 35.70 kg
21 130 x 130 x 12 x 12 mm 280.00 kg 46.67 kg
No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1
PLAT BETON
VOLUME LEBAR TEBAL PANJANG
1.00 1.00 0.12 8.33
JARAK TULANGAN jumlah tulangan(m') melint jumlah tulangan(m') memanja diameter volume tulangan (kg)
1 LAPIS 0.10 11.00 11.00 84.33 84.00 0.62 108.91
2 LAPIS 0.10 11.00 11.00 84.33 84.00 0.62 231.96
HARGA UPAH
NO JENIS PEKERJA BANGUNAN ( Rp. ) SATUAN WAKTU
Dibuat :
HERYANTO
Page 7
Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
1 2 3 4
1 2 3 4
Kanstin Paving Blok bh 45,000.00
Semen PC / 50 kg *M080 zak 68,000.00
Semen PC Kg 1,360.00
Semen Putih zak 90,000.00
Kanstin Jalan ukuran Besar ( bina Marga ) 1 bh = 50 cm bh 37,000.00
Kanstin Jalan ukuran 1 bh = 50 cm, tinggi 20 cm bh 22,500.00
Kanstin Jalan ukuran Besar ( bina Marga K - 300 ) 1 bh = 50 cm bh 50,000.00
Readymix Beton K 350, tanpa pompa ( selang ) 1,000,000.00
Readymix Beton K 300, tanpa pompa ( selang ) m³ 975,000.00
Readymix Beton K 225, tanpa pompa ( selang ) m³ 950,000.00
Readymix Beton K 175, tanpa pompa ( selang ) m³ 900,000.00
Kapur Pasang/ kapur tembok m³ 60,000.00
Kapur Sirih kg 1,500.00
Semen Warna kg 6,000.00
Tanah Liat m³ 37,000.00
Tanah Urug (dilokasi) m³ 25,000.00
Rumput m² 45,000.00
Hollow Block 20 bh 3,000.00
Hollow Block 15 bh 2,400.00
Hollow Block 10 bh 1,900.00
Roster Terawang Keramik bh 30,000.00
Batu Candi m2 95,000.00
Batu Sikat 0,5 / 2 cm m2 100,000.00
Neut Kusen bh 3,500.00
B BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
Plamir Tembok kg 14,000.00
Cat Tembok ICI Eksterior ( BETON ) kg 40,000.00
Cat Tembok Kelas II kg 10,000.00
Cat Tembok ICI Interior ( PLAFOND DAN DINDING ) lt 30,000.00
Cat Tembok Vinilex kg 15,000.00
Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt 95,000.00
Cat Tembok Sanlex kg 11,000.00
Cat Genteng kg 25,000.00
Cat Tahan Asam kg 50,000.00
Cat Berkilat/Cat kayu kg 55,000.00
Coating Batu kg 62,000.00
Plamir Kayu kg 15,000.00
Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) lt 50,000.00
Water Profing Emulsion kg 95,000.00
Water Profing Membrance ml 80,000.00
Rool Cat Tembok bh 22,000.00
Kape Tembok bh 9,000.00
Kape Kayu bh 7,000.00
Soligneum 1 blek 5 lt 63,000.00
Plincote kg 30,000.00
Page 9
1 2 3 4
Pengawetan Kayu m³ 45,000.00
Pengopenan Kayu m³ 650,000.00
Kwas 3" bh 10,000.00
Kwas 2' bh 7,000.00
Oker kg 40,000.00
Oyan bks 4,500.00
Oten (Pewarna Plitur ) bks 4,500.00
Spirtus lt 11,000.00
Bahan Plitur Kripik ( Sirlak India ) kg 24,000.00
Dempul Lilin kg 23,000.00
Dempul Plitur kg 3,500.00
Dempul Halus / Imfra ( Wood Filler ) kg 45,000.00
Wood Stain kg 60,000.00
Melamik Hardener kg 60,000.00
Melamik Clear Dop/Gloss kg 45,000.00
Terpentin lt 9,000.00
Tiner A lt 16,000.00
Tiner B lt 25,000.00
Kumpon kg 24,000.00
Melamik kg 45,000.00
Impra kg 40,000.00
Dempul Plastik kg 35,000.00
Dempul Duco kg 36,000.00
Ampelas lbr 2,500.00
Dempul Kayu Cap Kucing kg 28,000.00
Meni Kayu / Besi kg 22,000.00
Meni Sincromat kg 25,000.00
Cat Kayu Sieve kg 65,000.00
Cat Besi Sieve kg 65,000.00
Cat Besi Duco Danaglos/ICI kg 75,000.00
Cat Bron kg 65,000.00
Sirlak kg 70,000.00
Lem Fox bh 16,000.00
Page 10
1 2 3 4
1 2 3 4
List profil Kayu Lokal KLs II 4 cm m1 3,000.00
Page 12
1 2 3 4
1 2 3 4
F BAHAN LANTAI DAN PELAPIS DINDING
Tegel PC 20 x 20 bh 2,000.00
Plin Tegel PC 10 x 20 bh 1,500.00
Tegel PC 30 x 30 bh 4,000.00
Plin Tegel PC 15 x 30 bh 2,500.00
Tegel Warna 20 x 20 bh 2,500.00
Plin Tegel Warna 10 x 20 bh 2,000.00
Tegel Warna 30 x 30 bh 4,500.00
Plin Tegel Warna 15 x 30 bh 3,000.00
Tegel Badak PC 30 x 30 bh 4,000.00
Poslin 11 x 11 Warna Standar DN m² 50,000.00
Poslin 11 x 11 Warna Khusus DN m² 55,000.00
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos m² 45,000.00
Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip m² 50,000.00
Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip m² 50,000.00
Keramik 20 x 20 (KM) KWI DN Putih Polos m² 45,000.00
Keramik 20 x 25 Dinding KM KWI DN Corak m² 50,000.00
Keramik 20 x 60 Dinding KM KWI DN Corak m² 70,000.00
Keramik 30 x 30 KW I DN putih polos m² 45,000.00
Keramik 30 x 30 KW I DN Warna/Corak / Anti Slip m² 55,000.00
Granito Tile Esenssza 40 x 40 polis m² 400,000.00
Granito Tile Esenssza 40 x 40 un polis m² 300,000.00
Granito Tile Esenssza 60 x 60 polis m² 450,000.00
Granito Tile Esenssza 60 x 60 un polis m² 350,000.00
Keramik 40 x 40 cm dus 65,000.00
Keramik 60 x 60 cm dus 80,000.00
Keramik Mozaik 30 x 30 cm dus 75,000.00
Vinyl Lantai standar m² 30,000.00
Stairnosing keramik 10/20 bh 10,000.00
Stairnosing fiber m' 24,000.00
Taraso Kerang 30 x 30 m² 35,000.00
Plin Taraso 10 x 30 bh 7,000.00
Granit Alam LN Ukuran Besar m² 2,200,000.00
Granit Alam LN Ukuran Kecil m² 1,700,000.00
Granit Alam DN Ukuran Besar m² 1,500,000.00
Granit Alam DN Ukuran Kecil m² 1,300,000.00
Marmer Alam Lampung Ukuran Besar m² 250,000.00
Marmer Alam Lampung Ukuran Kecil m² 180,000.00
Marmer Alam Citatah Ukuran Besar m² 600,000.00
Marmer Alam Citatah Ukuran Kecil m² 400,000.00
Marmer Sintetis m² 350,000.00
Bata Karawang bh 6,500.00
Campuran untuk Kedap Air (AM) ltr 35,000.00
Lantai Parket m² 450,000.00
Stepnozing m' 17,000.00
Plint Keramik 5/25 bh 12,000.00
Keramik Lantai Antislip sekualitas Romance KW I Warna 33x33 cm m2 75,000.00
Keramik Lantai sekualitas Romance KW I Warna 33x33 cm m2 70,000.00
Page 14
1 2 3 4
1 2 3 4
Plat Srip Ø 3 x 30 mm ( 6 m1) bt 75,000.00
Plat Alumunium 0.1 mm m² 50,000.00
Plat Alumunium 0.2 mm m² 85,000.00
Plat Alumunium 0.3 mm m² 120,000.00
Plat Alumunium 0.4 mm m² 135,000.00
Plat Alumunium 0.5 mm m² 160,000.00
Plat Alumunium 0.6 mm m² 180,000.00
Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " ) m1 170,000.00
Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " ) m1 190,000.00
Kusen Alumunium 4" CA (terpasang) m1 85,000.00
Kusen Alumunium Warna 4" CA (terpasang) m1 105,000.00
Handle Alumunium ( Tarikan Pintu Alumunium ) bh 95,000.00
Hurup Stainless cm 8,000.00
Kait Angin alumunium ps 95,000.00
Karet Asisoris Kusen / Pintu Alumunium m1 4,000.00
Seng Plat BJLS dia. 60 cm ( 100 m1 ) m1 28,000.00
Seng Plat BJLS dia. 90 cm ( 100 m1 ) m1 35,000.00
Plat Besi Tipis 1 mm kg 13,000.00
Plat Besi Tipis 0.5 mm kg 13,000.00
Plat Besi 2 mm s/d 5 mm kg 13,000.00
Plat Besi 6 mm s/d 10 mm kg 13,000.00
Plat Besi 10 mm Ke atas kg 13,000.00
Lem Kuning (aibond) kg 50,000.00
Lem Fox kg 15,000.00
Rolling door Besi m2 550,000.00
Pintu Aluminium m2 210,000.00
Pintu Swing 5 mm unt 1,100,000.00
Pintu Swing 8 mm unt 1,800,000.00
Teralis Besi strip m2 125,000.00
Besi Teralis m2 550,000.00
Pintu kaca Frameless (Lengkap kunci dan Floorhings) ps 8,500,000.00
Daun Pintu Kaca Aluminium Warna B 80 unt 1,500,000.00
Daun Pintu Kaca Aluminium Warna B 70 unt 1,400,000.00
Daun Pintu Kaca Aluminium Warna B 45 unt 1,200,000.00
Daun Pintu KM/WC Aluminium Warna B.60 unt 1,100,000.00
Daun Jendela Aluminium Warna (casement) 1X0.55 unt 500,000.00
Daun Jendela Aluminium Warna (casement) 0.25 X1.15 unt 400,000.00
Daun Jendela Aluminium Warna (casement) 65 X115 unt 500,000.00
Handrill Stainless 2 " m' 275,000.00
Page 16
1 2 3 4
I BAHAN KACA
Kaca Polos 2 mm m² 45,000.00
Kaca Polos 3 mm m² 50,000.00
Kaca Es 5 mm m² 70,000.00
Kaca Polos 5 mm m² 60,000.00
Kaca Polos Tebal 8 mm m² 180,000.00
Kaca Polos Tebal 12 mm m² 250,000.00
Kaca Rayband 5 mm ( ASAHI ) m² 65,000.00
Kaca Rayband 8 mm ( ASAHI ) m² 600,000.00
Kaca Rayband 12 mm ( ASAHI ) m² 900,000.00
Kaca Patri Lokal Terpasang ( ASAHI ) m² 365,000.00
Kaca Patri EX Luar negeri terpasang m² 1,500,000.00
Glass Block DN 20 x 20 bh 25,000.00
Glass Block 20 x 20 Ex LN bh 80,000.00
K BAHAN PERPIPAAN
Besi Pipa untuk Hydrant BSP Ø 1" bt 100,000.00
Besi Pipa untuk Hydrant BSP Ø 1,25" bt 115,000.00
Besi Pipa untuk Hydrant BSP Ø 1,5" bt 130,000.00
Besi Pipa untuk Hydrant BSP Ø 2" bt 150,000.00
Besi Pipa untuk Hydrant BSP Ø 2,5" bt 440,000.00
Besi Pipa untuk Hydrant BSP Ø 3" bt 600,000.00
Besi Pipa untuk Hydrant BSP Ø 4" bt 850,000.00
Besi Pipa untuk Hydrant BSP Ø 6" bt 1,500,000.00
Hydrant bh 270,000.00
Besi Pipa Hitam Ø 1" t=2 mm bt 90,000.00
Besi Pipa Hitam Ø 2" t=2 mm bt 180,000.00
Besi Pipa Hitam Ø 3" t=2 mm bt 320,000.00
Besi Pipa Hitam Ø 4" t=2 mm bt 400,000.00
Besi Pipa Hitam Ø 6" t=2 mm bt 550,000.00
Page 17
1 2 3 4
Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bt 90,000.00
Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt 105,000.00
Pipa GIP Medium A Ø 1" ( 6 m1 ) bt 160,000.00
Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt 200,000.00
Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt 240,000.00
Pipa GIP Medium A Ø 1 3/4"( 6 m1 ) bt 300,000.00
Pipa GIP Medium A Ø 2" ( 6 m1 ) bt 360,000.00
Pipa GIP Medium A Ø 2 1/2" ( 6 m1 ) bt 500,000.00
Pipa GIP Medium A Ø 3" ( 6 m1 ) bt 600,000.00
Pipa GIP Medium A Ø 4" ( 6 m1 ) bt 800,000.00
Macam2 Sambungan GIP Ø 1/2" bh 4,000.00
Macam2 Sambungan GIP Ø 3/4" bh 7,000.00
Macam2 Sambungan GIP Ø 1" bh 10,000.00
Macam2 Sambungan GIP Ø 1 1/4" bh 13,000.00
Macam2 Sambungan GIP Ø 1 1/2" bh 14,000.00
Macam2 Sambungan GIP Ø 1 3/4" bh 22,000.00
Macam2 Sambungan GIP Ø 2" bh 30,000.00
Macam2 Sambungan GIP Ø 2 1/2" bh 42,000.00
Macam2 Sambungan GIP Ø 3" bh 55,000.00
Macam2 Sambungan GIP Ø 4" bh 60,000.00
Pipa PVC RUCIKA type AW Ø 1/2" bt 25,000.00
Pipa PVC RUCIKA type AW Ø 3/4" bt 38,000.00
Pipa PVC RUCIKA type AW Ø 1" bt 48,000.00
Pipa PVC RUCIKA type AW Ø 1 1/4" bt 65,000.00
Pipa PVC RUCIKA type AW Ø 1 1/2" bt 85,000.00
Pipa PVC RUCIKA type AW Ø 2" bt 135,000.00
Pipa PVC RUCIKA type AW Ø 2 1/2" bt 160,000.00
Pipa PVC RUCIKA type AW Ø 3" bt 250,000.00
Pipa PVC RUCIKA type AW Ø 4" bt 350,000.00
Pipa PVC RUCIKA type AW Ø 6" bt 700,000.00
Pipa PVC RUCIKA type AW Ø 8" bt 1,000,000.00
Pipa PVC MASPION ABU Ø 1/2" (AW) bt 16,000.00
Pipa PVC MASPION ABU Ø 3/4" (AW) bt 22,000.00
Pipa PVC MASPION ABU Ø 1" (AW) bt 27,000.00
Pipa PVC MASPION ABU Ø 1 1/4" (AW) bt 38,000.00
Pipa PVC MASPION ABU Ø 1 1/2" (AW) bt 48,000.00
Pipa PVC MASPION ABU Ø 2" (AW) bt 85,000.00
Pipa PVC MASPION ABU Ø 2 1/2" (AW) bt 105,000.00
Pipa PVC MASPION ABU Ø 3" (AW) bt 160,000.00
Pipa PVC MASPION ABU Ø 4" (AW) bt 200,000.00
Pipa PVC MASPION ABU Ø 6" (AW) bt 620,000.00
Pipa GI Diameter 0,5" bt 45,000.00
Pipa GI Diameter 0,75" bt 60,000.00
Pipa GI Diameter 1" bt 70,000.00
Pipa GI Diameter 1,25" bt 105,000.00
Pipa GI Diameter 1,5" bt 125,000.00
Pipa GI Diameter 2" bt 150,000.00
Pipa GI Diameter 2,5" bt 250,000.00
Pipa GI Diameter 3" bt 350,000.00
Page 18
1 2 3 4
Pipa GI Diameter 4" bt 400,000.00
Knie PVC Diameter 0,5" bh 2,000.00
Knie PVC Diameter 0,75" bh 2,000.00
Knie PVC Diameter 1" bh 4,000.00
Knie PVC Diameter 2" bh 15,000.00
Knie PVC Diameter 3" bh 20,000.00
Knie PVC Diameter 4" bh 55,000.00
Tee PVC Diameter 0,5" bh 2,000.00
Tee PVC Diameter 0,75" bh 2,000.00
Tee PVC Diameter 1" bh 4,000.00
Tee PVC Diameter 2" bh 6,000.00
Tee PVC Diameter 3" bh 8,000.00
Tee PVC Diameter 4" bh 14,000.00
Kran Diameter 0,5" bh 30,000.00
Fiet Kran Diameter 0,5" bh 45,000.00
Fiet Kran Diameter 0,75" bh 75,000.00
Fiet Kran Diameter 1" bh 120,000.00
Fiet Kran Diameter 2" bh 430,000.00
Fiet Kran Diameter 3" bh 890,000.00
Fiet Kran Diameter 4" bh 1,890,000.00
Macam2 Sambungan Paralon Ø 1/2" bh 5,000.00
Macam2 Sambungan Paralon Ø 3/4" bh 5,000.00
Macam2 Sambungan Paralon Ø 1" bh 18,000.00
Macam2 Sambungan Paralon Ø 1 1/4" bh 20,000.00
Macam2 Sambungan Paralon Ø 1 1/2" bh 20,000.00
Macam2 Sambungan Paralon Ø 1 3/4" bh 20,000.00
Macam2 Sambungan Paralon Ø 2" bh 20,000.00
Macam2 Samb. Paralon Ø 2 1/2" bh 20,000.00
Macam2 Samb. Paralon Ø 3" bh 50,000.00
Macam2 Samb. Paralon Ø 4" bh 60,000.00
Sambungan Pipa PVC Jenis AW 4 " TY bh 35,000.00
Lem Paralon bh 7,000.00
Solatip Leideng gl 3,000.00
Pipa PVC 4" berlobang jenis AW m1 50,000.00
L BAHAN SANITAIR
Stop Kran 1/2 " KIT bh 35,000.00
Stop Kran 3/4 " KIT bh 40,000.00
Stop Kran 1 " KIT bh 240,000.00
Stop Kran 1 1/2 " KIT bh 320,000.00
Stop Kran 2 " KIT bh 800,000.00
Stop Kran 2 1/2" KIT bh 900,000.00
Stop Kran 3 " KIT bh 1,300,000.00
Fiet kran 3/4" bh 75,000.00
Fiet kran 1" bh 90,000.00
Fiet kran 2" bh 250,000.00
Fiet kran 3" bh 560,000.00
Fiet kran 4" bh 900,000.00
Saringan Air Lt KM Stainless Steel bh 48,000.00
Page 19
1 2 3 4
Apooer Bath Tube bh 280,000.00
Kran stain less Lokal Kait bh 60,000.00
Shower Dengan Tiang bh 300,000.00
Shower Tanpa Tiang bh 250,000.00
Kran Tembok Sun Eui dia. 1/2 " bh 105,000.00
Kran Tembok ITAP dia. 1/2 " bh 42,000.00
Kran Bebek Sun Eui 1/2 " bh 180,000.00
Kran Bebek ITAP 1/2 " bh 65,000.00
Kran Zet Shower 1/2 " bh 80,000.00
Kran Panas Dingin San Eui Standard bh 500,000.00
Bath Cape Washteren unit 2,350,000.00
Tempat Sabun Poslin bh 52,000.00
Wastafel Lengkap TOTO LW 230 unit 1,400,000.00
Wastafel Lengkap INA unit 750,000.00
Wastafel Bulat Warna Standard Lengkap unit 1,600,000.00
Closet Duduk Poslin (INA) Lengkap set 1,900,000.00
Closet Jongkok Poslin (INA) bh 160,000.00
Closet Jongkok Teraso bh 95,000.00
Closet Jongkok Poslin warna TOTO unit 450,000.00
Closet Jongkok Standard Putih Poslin TOTO unit 220,000.00
Closet Jongkok Lengkap Sistem Jet TOTO unit 2,250,000.00
Closet Duduk Warna Standard TOTO C 240 Lengkap unit 2,400,000.00
Closet Duduk Warna Standard lengkap INA bh 1,500,000.00
Urinoar Lengkap TOTO Warna Standard lengkap unit 1,750,000.00
Penyekat Poslin Urinoar TOTO lbr 450,000.00
Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh 200,000.00
Kitchen Zink Stainless Non Standard Franke ( 1 Lobang ) bh 150,000.00
Kitchen Zink Stainless Non Standard Franke ( 2 Lobang ) bh 320,000.00
Bak Mandi Teraso bh 280,000.00
Bak Mandi Fiber Glass 60 x 60 cm bh 200,000.00
Floordrain stainless bh 28,000.00
1 2 3 4
Atap Genteng Plentong pres Molen Oven KW1 bh 1,800.00
Atap Genteng Flam pres Molen Oven Jatiwangi bh 1,300.00
Genting Morando bh 3,000.00
Bubung Genteng pres Bulat Ex Jatiwangi bh 5,500.00
Genteng Bubungan Ex Jatiwangi Segi Tiga bh 4,000.00
Genteng Bubungan Beton bh 5,000.00
Genteng Beton Warna 14,5/m2 bh 9,000.00
Genteng Beton Natural bh 6,000.00
Atap Genteng Beton Warna 14,5/m2 m² 95,000.00
Genteng Beton Natural m² 65,000.00
Sirap Kelas I ( 80 / m2 ) bh 22,000.00
Sirap m² 105,000.00
Genteng Keramik bh 9,000.00
Genteng Keramik Natural Intan 14,5 / m2 m² 84,000.00
Genteng Keramik Glasur Standard 14,5 / m2 m² 130,000.00
Genteng Keramik Glasur Special 14,5 / m2 m² 150,000.00
Genteng Keramik Glasur Premium 14,5 / m2 m² 155,000.00
Genteng Murando Natural 1m2 = 18 bh bh 3,000.00
Genteng Murando Glasur 1m2 = 20 bh bh 6,000.00
Genting Magas bh 2,000.00
Bubung Murando Natural bh 5,000.00
Bubung Murando Glasur bh 9,000.00
Bubungan Genteng Keramik bh 9,000.00
Bubungan Genteng Palentong bh 3,000.00
Bubungan Genting Flam bh 3,000.00
Bubungan Genting Magas eks banjar bh 4,000.00
N BAHAN ELEKTRIKAL
Ammeter bh 90,000.00
Arrester 3p+1N, tk 1 bh 1,470,000.00
Bonding bh 7,200.00
Busbar 100 A bh 90,000.00
CT 50/5 bh 60,000.00
conduit bh 4,800.00
Earthing Rood bh 360,000.00
Fuse set 8,400.00
Inbow panasonics bh 4,200.00
Kabel Data UTP Cat 5e m 9,600.00
Kabel NYM 2x2,5mm² m 9,600.00
Kabel NYM 3x2,5 mm² m 12,600.00
Kabel NYY 4x16 mm² m 104,700.00
Kabel NYY 4x10 mm² m 71,400.00
Kabel Telepon ITC 0,6 x2 m 1,800.00
Kawat BC 25 mm m 54,000.00
Kotak Kontak bh 14,400.00
Kotak Kontak AC bh 54,000.00
lampu baret 19 watt bh 240,000.00
Page 21
1 2 3 4
Lampu Indikator bh 14,400.00
Lampu Downlight 9 watt bh 109,250.00
Lampu RMI 2x36 watt bh 373,750.00
Lampu RMI 2X18 watt bh 336,950.00
Lampu Globe Ambiance 14 watt bh 86,250.00
Lampu SL 9 watt set 51,750.00
MCB 6 A 1 Fasa bh 47,400.00
MCB 10 A 1 Fasa bh 47,400.00
MCB 20 A 1 Fasa bh 47,400.00
MCCB 40 A 3 Fasa bh 409,200.00
MCCB 25 A 3 Fasa bh 409,200.00
MCCB 20 A 3 fasa bh 409,200.00
Outlet Data bh 54,000.00
Outlet Telepon bh 50,400.00
Outlet Lantai set 690,000.00
Panel 60x40x20 bh 1,080,000.00
Panel 40x60x20 bh 600,000.00
Saklar Ganda bh 17,250.00
Saklar Tunggal bh 13,225.00
Spitzen Petir 90 cm set 165,000.00
Voltmeter bh 82,500.00
Pipa GIP 1" m 55,000.00
Duradoost bh 16,500.00
1 2 3 4
0
0 Dibuat :
0
HERYANTO
0
0
HARGA SATUAN PEKERJAAN
1 2 3
23 dari 113
1 2 3
A.04.15 1 M1 PEMBUATAN TIANG PANCANG (40 X 40) CM, BETON BERTULANG 908,700.00
A.04.16 1 M1 PEMBUATAN TIANG PANCANG (35 X 35) CM, BETON BERTULANG 690,500.00
A.04.17 1 M3 MEMBUAT PONDASI BETON BERTULANG (157.5000 kg BESI + BEKISTNG) 3,700,600.00
A.04.18 1 M3 MEMBUAT SLOOF 10/15 (204.4000 Kg Besi + Bekisting) 4,656,000.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.19 1 M3 MEMBUAT SLOOF 12/15 (172.9000 Kg Besi + Bekesting) 4,080,660.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.20 1 M3 MEMBUAT SLOOF 12/15 (259,0000 Kg Besi + Bekesting) 5,195,500.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.21 1 M3 MEMBUAT SLOOF 15/20 (117.6000 Kg Besi + Bekesting) 3,218,100.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.22 1 M3 MEMBUAT SLOOF 15/20 (180,6000 Kg Besi + Bekesting) 4,033,900.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.23 1 M3 MEMBUAT SLOOF 25/30 (112.0900 Kg Besi + Bekesting) 2,883,200.00
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.24 1 M3 MEMBUAT SLOOF 20/30 (154,0431 Kg Besi + Bekesting) 3,551,900.00
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.25 1 M3 MEMBUAT KOLOM 12/12 (211.2900 Kg Besi + Bekesting) 4,700,600.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.26 1 M3 MEMBUAT KOLOM 12/12 (314.9700 Kg Besi + Bekesting) 6,042,800.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.27 1 M3 MEMBUAT KOLOM 15/15 (141.3800 Kg Besi + Bekesting) 3,620,300.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.28 1 M3 MEMBUAT KOLOM 15/15 (223,4100 Kg Besi + Bekesting) 4,682,300.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.29 1 M3 MEMBUAT KOLOM 15/20 (117.5900 Kg Besi + Bekesting) 3,731,900.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.30 1 M3 MEMBUAT KOLOM 15/20 (180,5700 Kg Besi + Bekesting) 4,548,800.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.31 1 M3 MEMBUAT KOLOM 15/30 (132,4000 Kg Besi + Bekesting) 3,771,100.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.32 1 M3 MEMBUAT KOLOM 20/20 (92.0500 Kg Besi + Bekesting) 3,248,600.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.33 1 M3 MEMBUAT KOLOM 20/20 (142,4500 Kg Besi + Bekesting) 3,901,200.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.34 1 M3 MEMBUAT KOLOM 25/25 (100.1300 Kg Besi + Bekesting) 3,151,200.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.35 1 M3 MEMBUAT KOLOM 30/30 (171,6700 Kg Besi + Bekesting) 3,930,800.00
DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
A.04.36 1 M3 MEMBUAT KOLOM 25/40 (166,3200 Kg Besi + Bekesting) 3,983,500.00
DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
A.04.37 1 M3 MEMBUAT RING BALK 10/15 (204.4000 Kg Besi + Bekesting) 5,033,000.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.38 1 M3 MEMBUAT RING BALK 10/15 (280.0000 Kg Besi + Bekesting) 6,011,700.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 20 CM
A.04.39 1 M3 MEMBUAT RING BALK 12/15 (172.9000 Kg Besi + Bekesting) 4,470,500.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.40 1 M3 MEMBUAT RING BALK 15/15 (141.4000 Kg Besi + Bekesting) 3,887,500.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.41 1 M3 MEMBUAT RING BALK 15/15 (212,8000 Kg Besi + Bekesting) 4,811,900.00
24 dari 113
1 2 3
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.42 1 M3 MEMBUAT RING BALK 15/20 (117,6000 Kg Besi + Bekesting) 3,502,100.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.43 1 M3 MEMBUAT RING BALK 15/20 (180,6000 Kg Besi + Bekesting) 4,317,800.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.44 1 M3 MEMBUAT RING BALK 15/25 ( 98.1900 Kg Besi + Bekesting) 3,200,300.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.45 1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting) 3,896,400.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.46 1 M3 MEMBUAT RING BALK 15/25 (201,7900 Kg Besi + Bekesting) 4,541,700.00
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.47 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.8 JARAK 10 cm TEBAL 6 cm 4,323,000.00
A.04.48 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 10 cm TEBAL 8 cm 3,630,700.00
A.04.49 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm 3,842,500.00
A.04.50 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm 4,600,300.00
A.04.51 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm 4,083,400.00
A.04.52 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 15 cm TEBAL 12 cm 5,153,800.00
A.04.53 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 15 cm TEBAL 20 cm 3,802,600.00
A.04.54 1 M3 PEK. Plat Beton Tulang, Tulangan 2 Lapis DIA.16-17.5 cm dan DIA. 10-12.5 cm Tebal 20 cm 3,977,100.00
A.04.55 1 M3 PEK. Plat Beton Tulang, Tulangan 2 Lapis DIA.16 - 15 CM dan DIA. 12 - 15 cm Tebal 20 cm 4,396,800.00
A.05.01 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps 185,700.00
A.05.02 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps 102,800.00
A.05.03 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps 96,200.00
A.05.04 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps 92,400.00
A.05.05 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps 89,900.00
A.05.06 1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.20) CAMP 1 PC : 4 PS 212,600.00
A.05.07 1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.15) CAMP 1 PC : 4 PS 166,400.00
A.05.08 1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.10) CAMP 1 PC : 4 PS 122,300.00
A.05.09 1 M2 PASANGAN DINDING DINDING ROSTER/TERAWANG (12X11X24) KERAMIK CAMP 1 PC : 4 PS 1,034,300.00
A.06.01 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIAN 44,900.00
A.06.02 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIAN 41,600.00
A.06.03 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN 39,400.00
A.06.04 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN 38,100.00
A.06.05 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 20 MM + ACIAN 60,000.00
A.06.06 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 20 MM + ACIAN 48,100.00
A.06.07 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 20 MM + ACIAN 52,700.00
A.06.08 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM + ACIAN 51,000.00
A.06.09 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM + ACIAN 55,300.00
A.06.10 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 25 MM + ACIAN 52,600.00
A.06.11 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM + ACIAN 49,600.00
A.06.12 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 25 MM + ACIAN 47,500.00
A.06.13 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 30 MM + ACIAN 67,800.00
A.06.14 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 30 MM + ACIAN 61,500.00
A.06.15 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 30 MM + ACIAN 57,800.00
A.06.16 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 30 MM + ACIAN 53,400.00
A.06.17 1 M2 PASANGAN PLESTERAN SKONING 1 Pc : 2 Ps, LEBAR 10 MM 35,900.00
A.06.18 1 M2 PASANGAN PLESTERAN CIPRAT, 1 Pc : 2 Ps 30,500.00
A.06.19 1 M2 PASANGAN PLESTERAN SIAR ADUKAN 1 Pc : 2 Ps 38,000.00
A.06.20 1 M2 ACIAN PC 22,800.00
A.07.01 1 M2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU 45,300.00
A.07.02 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER 237,300.00
25 dari 113
1 2 3
A.07.03 1 M2 PASANG RANGKA DINDING PEMISAH (60 X 120 CM ) KAYU KAYU LOKAL KLS II 111,600.00
A.07.04 1 M2 PASANG DINDING PEMISAH , RANGKA KAYU KAMPER 244,100.00
A.07.05 1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER 381,100.00
A.07.06 1 M2 PASANG PLYWOOD TEBAL 4 mm, UNTUK DINDING 60,600.00
A.07.07 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATI 14,051,900.00
A.07.08 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAMPER 11,026,900.00
A.07.09 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATI 14,879,100.00
A.07.10 1 M2 PASANGAN PINTU KLAMP KAYU KAMPER 448,500.00
A.07.11 1 M2 PASANGAN PINTU KLAMP KAYU KAYU LOKAL KLS II 199,900.00
A.07.12 1 M2 PASANGAN PINTU PANEL KAYU JATI 743,600.00
A.07.13 1 M2 PASANGAN PINTU PANEL KAYU KAMPER 633,600.00
A.07.14 1 M2 PASANGAN PINTU PANEL KAYU JATI 743,600.00
A.07.15 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II LAPIS ALUMUNIUM 517,000.00
A.07.16 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATI 500,700.00
A.07.17 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAMPER 434,700.00
A.07.18 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATI 500,700.00
A.07.19 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATI 1,020,800.00
A.07.20 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU KAMPER 844,800.00
A.07.21 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU LOKAL KLS II 447,000.00
A.07.22 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI 655,300.00
A.07.23 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER 584,900.00
A.07.24 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II 425,800.00
A.07.25 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU JATI 622,800.00
A.07.26 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA EXPOSE KAMPER BANJAR 554,100.00
A.07.27 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU LOKAL KLS II 398,700.00
A.07.28 1 M2 PASANG PINTU PLYWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU JATI 738,800.00
A.07.29 1 M2 PASANG PINTU PLYWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU KAMPER 626,000.00
A.07.30 1 M2 PASANG PINTU PLYWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU LOKAL KLS II 514,700.00
A.07.31 1 M2 PASANG PINTU TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU JATI 716,800.00
A.07.32 1 M2 PASANG PINTU TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA KAYU KAMPER DI VERNIS 661,200.00
A.07.33 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU LOKAL KLS II (DIVERNIS) 505,900.00
A.07.34 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI 766,300.00
A.07.35 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU KAMPER BANJAR 774,500.00
A.07.36 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU LOKAL KLS II 586,200.00
A.07.37 1 M2 PASANGAN JALUSI MATI KUSEN KAYU JATI 901,200.00
A.07.38 1 M2 PASANGAN JALUSI MATI KUSEN KAYU KAMPER 736,200.00
A.07.39 1 M2 PASANGAN JALUSI MATI KUSEN KAYU LOKAL KLS II 363,300.00
A.08.01 1 M3 PASANG KONSTRUKSI KUDA - KUDA KONVENSIONAL KAYU KELAS I, II, DAN III BENTANG 6 M 1,443,400.00
A.08.02 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU JATI 13,312,400.00
A.08.03 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KAMPER BANJAR 10,287,400.00
A.08.04 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KRUING 6,052,400.00
A.08.05 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA KAYU KAYU LOKAL KLS II 3,874,400.00
A.08.06 1 M3 PASANG KONSTRUKSI GORDENG KAYU KELAS II 3,376,100.00
A.08.07 1 M2 PASANG RANGKA ATAP GENTENG KODOK KAYU KAMPER 142,300.00
A.08.08 1 M2 PASANG RANGKA ATAP GENTENG PALENTONG KAYU LOKAL KLS II 60,700.00
A.08.09 1 M2 PASANG RANGKA ATAP GENTENG PALENTONG KAYU ALBASIAH 53,000.00
A.08.10 1 M2 PASANG RANGKA ATAP GENTENG BETON KAYU KAYU LOKAL KLS II 83,100.00
A.08.11 1 M2 PASANG RANGKA ATAP SIRAP KAYU KAMPER BANJAR 155,200.00
A.08.12 1 M2 PASANG RANGKA ATAP SIRAP KAYU LOKAL KLS II 59,000.00
A.08.13 1 M2 PASANG ATAP GENTENG MORANDO NATURAL (18 BH) 71,800.00
A.08.14 1 M2 PASANG ATAP GENTENG BETON 90,400.00
26 dari 113
1 2 3
A.08.15 1 M2 PASANG ATAP GENTENG PALENTONG 54,800.00
A.08.16 1 M2 PASANG ATAP GENTENG FLAM 49,300.00
A.08.17 1 M1 PASANG BUBUNG GENTENG MORANDO NATURAL 72,700.00
A.08.18 1 M1 PASANG BUBUNG GENTENG PALENTONG 67,200.00
A.08.19 1 M1 PASANG BUBUNG GENTENG FLAM 67,200.00
A.08.20 1 M2 PASANG ATAP ASBES GELOMBANG (2.40 x 0.90 m) x 5 mm 69,200.00
A.08.21 1 M2 PASANG ATAP ASBES GELOMBANG (1.80 x 0.90 m) x 5 mm 55,600.00
A.08.22 1 M2 PASANG ATAP ASBES GELOMBANG (2.40 x 0.90 m) x 4 mm 62,700.00
A.08.23 1 M1 PASANG NOK ASBES GELOMBANG , 4 mm 41,300.00
A.08.24 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU JATI 146,600.00
A.08.25 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU KAMPER 116,900.00
A.08.26 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU LOKAL KLS II 49,800.00
A.08.27 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU ALBASIAH 44,500.00
A.08.28 1 M1 PASANG LISPLANK UKURAN (3 x 30) cm, KAYU JATI 148,000.00
A.08.29 1 M1 PASANG LISPLANK UKURAN (3 x 30) cm, KAYU KAMPER 117,700.00
A.08.30 1 M1 PASANG LISPLANK UKURAN (3 x 30) cm, KAYU LOKAL KLS II 49,300.00
A.08.31 1 M1 PASANG LISPLANK UKURAN 2 x (3 x 20) cm, KAYU KAMPER 160,200.00
A.08.32 1 M1 PASANG LISPLANK UKURAN 2 x (2 x 20) cm, KAYU KAMPER 92,900.00
A.08.33 1 M1 PASANG LISPLANK UKURAN 2 x (2 x 20) cm, KAYU LOKAL KLS II 40,000.00
A.08.34 1 M1 PASANG TALANG DATAR/JURAI SENG BJLS 128,600.00
A.08.35 1 M1 PASANG TALANG 1/2 LINGKARAN D-15 CM, SENG BJLS 69,600.00
A.09.01 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU JATI 208,500.00
A.09.02 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU KAMPER 166,100.00
A.09.03 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU LOKAL KLS II 76,300.00
A.09.04 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU ALBASIAH 67,900.00
A.09.05 1 M2 PASANG RANGKA LANGIT - LANGIT (60 x 60) cm, KAYU LOKAL KLS II 77,000.00
A.09.06 1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm 19,200.00
A.09.07 1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm 38,100.00
A.09.08 1 M1 PASANG LIST PLAFOND PROFIL KAYU KAMPER BANJAR 4/4 CM 11,100.00
A.09.09 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4 10,000.00
A.10.01 1 M2 PASANG LANTAI KERAMIK WARNA 10 X 20 CM 159,700.00
A.10.02 1 M2 PASANG LANTAI KERAMIK WARNA 10 X 33 CM 228,600.00
A.10.03 1 M2 PASANG LANTAI KERAMIK WARNA 20 X 20 CM 155,600.00
A.10.04 1 M2 PASANG LANTAI TEGEL BADAK ABU-ABU UKURAN 30 X 30 CM 96,500.00
A.10.05 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS 148,100.00
A.10.06 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP 160,200.00
A.10.07 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM 176,500.00
A.10.08 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM ANTISLIP 182,500.00
A.10.09 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM 130,300.00
A.10.10 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40X40 CM 491,700.00
A.10.11 1 M2 PASANG LANTAI MARMER 376,900.00
A.10.12 1 M2 PASANG LANTAI PARQUET JATI 593,200.00
A.10.13 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH 170,500.00
A.10.14 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA 182,600.00
A.10.15 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, PUTIH 169,800.00
A.10.16 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, WARNA 175,800.00
A.10.17 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, PUTIH 164,400.00
A.10.18 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, WARNA 170,500.00
A.10.19 1 M2 PASANG DINDING KERAMIK 20 X 25 CM 170,500.00
A.10.20 1 M2 PASANG DINDING MARMER 494,000.00
27 dari 113
1 2 3
A.10.21 1 M2 PASANG PLINT KAYU 2 X 10 CM 50,300.00
A.10.22 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM) 104,400.00
A.10.23 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM) 109,400.00
A.10.24 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM) 112,200.00
A.10.25 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM) 117,700.00
A.10.26 1 M2 PASANGAN LANTAI BATU SIKAT 266,200.00
A.10.27 1 M2 PASANGAN BATU CANDI 174,200.00
A.10.28 1 M3 PASANGAN BATU TEMPEL+ SIARAN 234,700.00
A.10.29 1 M2 PASANG DINDING BATU TEMPEL 278,700.00
A.11.01 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK 3,046,700.00
A.11.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN 454,300.00
A.11.03 MEMASANG 1 BUAH URINOIR 2,643,100.00
A.11.04 MEMASANG 1 BUAH WASTAFEL 1,908,600.00
A.11.05 MEMASANG 1 BUAH BAK MANDI TRASO VOLUME 0,3 M3 485,200.00
A.11.06 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3 573,900.00
A.11.07 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3 12,349,400.00
A.11.08 MEMASANG 1 BUAH BADKIP PORSELEN 3,179,800.00
A.12.01 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5" 36,900.00
A.12.02 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75" 41,100.00
A.12.03 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1" 56,800.00
A.12.04 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5" 87,100.00
A.12.05 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3" 189,400.00
A.12.06 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4" 250,900.00
A.12.07 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" 16,900.00
A.12.08 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75" 22,500.00
A.12.09 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1" 26,700.00
A.12.10 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5" 26,700.00
A.12.11 1 M2 PASANG KACA, TEBAL 8 MM 230,700.00
A.12.12 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5" 74,500.00
A.12.13 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3" 82,400.00
A.12.14 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4" 99,400.00
A.12.15 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL 274,300.00
A.12.16 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" 40,900.00
A.12.17 MEMASANG 1 BH FLOOR DRAIN 38,600.00
A.13.01 1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA ( KANTOR TYPE BESAR ) 10,182,000.00
A.13.02 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA ( KANTOR TYPE KECIL ) 6,406,200.00
A.13.03 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL) 3,797,100.00
A.13.04 Memasang 1 Buah Bak Kontrol, Pas. Batu Bata ukuran (30X30) Tinggi 35 CM 344,500.00
A.13.05 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran (45X45) Tinggi 50 CM 292,900.00
A.13.06 Memasang 1 Buah Bak Kontrol Pas. Batu Bata ukuran (60X60) Tinggi 65 CM 453,400.00
A.13.07 1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGAN 191,900.00
A.13.08 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN 203,000.00
A.14.01 1 BUAH PASANG KUNCI TANAM BIASA 133,500.00
A.14.02 1 BUAH PASANG KUNCI TANAM KAMAR MANDI 94,200.00
A.14.03 1 BUAH PASANG KUNCI SILINDER 336,100.00
A.14.04 1 BUAH PASANG ENGSEL PINTU 31,500.00
A.14.05 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU 19,900.00
A.14.06 1 BUAH PASANG KAIT ANGIN 27,300.00
A.14.07 1 BUAH PASANG DOOR CLOSER 237,200.00
A.14.08 1 BUAH PASANG KUNCI SELOT PINTU 32,100.00
28 dari 113
1 2 3
A.14.09 1 BUAH PASANG TARIKAN PINTU 110,700.00
A.14.10 1 BUAH PASANG REL PINTU DORONG 322,000.00
A.15.01 1 M2 PASANG KACA, TEBAL 3 MM 72,200.00
A.15.02 1 M2 PASANG KACA, TEBAL 5 MM 84,300.00
A.15.03 1 M2 PASANG KACA, TEBAL 8 MM 230,700.00
A.15.04 1 M2 PASANG KACA PATRI, TEBAL 5 MM 453,400.00
A.16.01 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU ATAU TER 6,100.00
A.16.02 1 M2 PENGECATAN BIDANG CANSTIN (CAT SEKELAS ICI EKSTERIOR) 25,300.00
A.16.03 1 M2 PENGECATAN PLAFOND DAN DINDING (INTERIOR ICI) 55,500.00
A.16.04 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x) 55,500.00
A.16.05 1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x) 13,500.00
A.16.06 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x) 24,100.00
A.16.07 1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x) 20,000.00
A.16.08 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI 39,600.00
A.16.9 1 M2 PLITURAN BIDANG KAYU (BIASA) 35,600.00
A.16.10 1 M2 PENGECATAN BESI (3X) 41,900.00
A.16.11 1 M2 PENGECATAN BIDANG KAYU LAMA BERCAT 31,100.00
A.16.12 1 M2 PENGECATAN DINDING (LAMA) 12,100.00
A.17.01 1 KG PEK. ERECTION KONST KUDA-KUDA BESI 1,000.00
A.17.02 1 KG PASANG RANGKA ATAP BAJA 22,600.00
A.17.03 1 KG PEKERJAAN RANGKA KUDA-KUDA BAJA IWF 23,500.00
A.17.04 1 KG PEK. KONSTRUKSI BESI SIKU / PROFIL EX. DN 22,100.00
A.17.05 1 M2 PEKERJAAN BONDEX 189,600.00
A.17.06 1 M2 PEKERJAAN WIREMESH M8 69,500.00
A.17.07 1 Titik PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL = KAWAT 4 MM 2,500.00
A.17.08 1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR 4,600.00
A.17.09 1 M2 PASANG ROLLING DOOR 763,800.00
A.17.10 1 M2 PASANG PINTU ALUMINIUM 360,100.00
A.17.11 1 M2 PASANG TERALIS BESI 257,200.00
A.17.12 1 M2 PASANG JENDELA NAKO DAN TRALIS 116,100.00
A.17.13 1 M1 PEK.PAGAR DEPAN TRALIS STANDARD 1,226,500.00
A.17.14 1 M1 PEK. PAGAR BELAKANG / SAMPING 562,400.00
A.18.01 1 M2 PENGASPALAN MANUAL 53,600.00
A.18.02 1 M2 PENGASPALAN MANUAL 24,390.00
29 dari 113
Page 30
1 2 3 4 5 6=(3x5)
A.01.07 1 M2 BONGKARAN DINDING TEMBOK BATA MERAH
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.6667 Oh 45,000.00 30,001.50
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 32,311.50
Jumlah Bahan + Pekerja 32,311.50
Keuntungan Max. 10 % 3,231.15
Jumlah Total 35,542.65
Dibulatkan 35,500.00
A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN 1 METER
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.7500 Oh 45,000.00 33,750.00
Mandor 0.0250 Oh 70,000.00 1,750.00
Jumlah Pekerja 35,500.00
Jumlah Bahan + Pekerja 35,500.00
Keuntungan Max. 10 % 3,550.00
Jumlah Total 39,050.00
Dibulatkan 39,000.00
A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN 2 METER
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.9000 Oh 45,000.00 40,500.00
Mandor 0.0450 Oh 70,000.00 3,150.00
Jumlah Pekerja 43,650.00
Jumlah Bahan + Pekerja 43,650.00
Keuntungan Max. 10 % 4,365.00
Jumlah Total 48,015.00
Dibulatkan 48,000.00
A.02.09 1 M3 URUGAN TANAH KEMBALI
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 45,000.00 11,250.00
Mandor 0.0083 Oh 70,000.00 581.00
Jumlah Pekerja 11,831.00
Jumlah Bahan + Pekerja 11,831.00
Keuntungan Max. 10 % 1,183.10
Jumlah Total 13,014.10
Dibulatkan 13,000.00
Page 32
1 2 3 4 5 6=(3x5)
A.02.10 1 M3 PEMADATAN TANAH
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.1920 Oh 45,000.00 8,640.00
Mandor 0.0190 Oh 70,000.00 1,330.00
Jumlah Pekerja 9,970.00
Jumlah Bahan + Pekerja 9,970.00
Keuntungan Max. 10 % 997.00
Jumlah Total 10,967.00
Dibulatkan 10,900.00
A.02.11 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)
BAHAN :
Tanah Urug (didatangkan) 1.2000 m3 25,000.00 30,000.00
1 2 3 4 5 6=(3x5)
A.02.16 1 M2 MEMASANGAN LAPISAN IJUK TEBAL 10 CM UNTUK BIDANG RESAPAN
BAHAN :
Injuk 6.0000 kg 17,500.00 105,000.00
1 2 3 4 5 6=(3x5)
Jumlah Bahan + Pekerja 481,065.00
Keuntungan Max. 10 % 48,106.50
Jumlah Total 529,171.50
Dibulatkan 529,100.00
A.03.06 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 8 Ps
BAHAN :
Batu Belah 15/20 1.2000 m3 110,000.00 132,000.00
Semen Portland 91.0000 kg 1,360.00 123,760.00
Pasir Pasang 0.5840 m 3
120,000.00 70,080.00
Jumlah Bahan 325,840.00
UPAH :
Pekerja 1.5000 Oh 45,000.00 67,500.00
Tukang Batu 0.7500 Oh 60,000.00 45,000.00
Kepala Tukang 0.0750 Oh 65,000.00 4,875.00
Mandor 0.0750 Oh 70,000.00 5,250.00
Jumlah Pekerja 122,625.00
Jumlah Bahan + Pekerja 448,465.00
Keuntungan Max. 10 % 44,846.50
Jumlah Total 493,311.50
Dibulatkan 493,300.00
A.03.07 1 M3 PASANG PONDASI SIKLOP 60% BETON CAMPURAN 1 PC : 2 PB : 3 KR
DAN 40 % BATU BELAH
BAHAN :
Batu Belah 15/20 0.4800 m3 110,000.00 52,800.00
Semen Portland 194.0000 kg 1,360.00 263,840.00
Pasir Beton 0.3120 m3 135,000.00 42,120.00
Batu Pecah 2/3 0.4680 m3 175,000.00 81,900.00
Besi Beton 126.0000 kg 11,500.00 1,449,000.00
Kawat Beton 1.8000 kg 18,000.00 32,400.00
Jumlah Bahan 1,922,060.00
UPAH :
Pekerja 3.4000 Oh 45,000.00 153,000.00
Tukang Batu 0.8500 Oh 60,000.00 51,000.00
Kepala Tukang 0.0850 Oh 65,000.00 5,525.00
MAndor 0.1700 Oh 70,000.00 11,900.00
Jumlah Pekerja 221,425.00
Jumlah Bahan + Pekerja 2,143,485.00
Keuntungan Max. 10 % 214,348.50
Jumlah Total 2,357,833.50
Dibulatkan 2,357,800.00
A.03.08 1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CM
BAHAN :
Batu Belah 15/20 0.4500 m3 110,000.00 49,500.00
Semen Portland 194.0000 kg 1,360.00 263,840.00
Pasir Beton 0.3120 m3 135,000.00 42,120.00
Batu Pecah 2/3 0.4680 m3 175,000.00 81,900.00
Jumlah Bahan 437,360.00
UPAH :
Pekerja 2.4000 Oh 45,000.00 108,000.00
Tukang Batu 0.8000 Oh 60,000.00 48,000.00
Kepala Tukang 0.0800 Oh 65,000.00 5,200.00
Mandor 0.1190 Oh 70,000.00 8,330.00
Jumlah Pekerja 169,530.00
Jumlah Bahan + Pekerja 606,890.00
Keuntungan Max. 10 % 60,689.00
Jumlah Total 667,579.00
Page 35
1 2 3 4 5 6=(3x5)
Dibulatkan 667,500.00
A.03.09 1 M3 PASANGAN BATU BRONJONG
BAHAN :
Batu Bronjong 1.2000 m3 110,000.00 132,000.00
Kawat Bronjong 4 mm 8.0000 m3 13,000.00 104,000.00
Jumlah Bahan 236,000.00
UPAH :
Pekerja 1.5000 Oh 45,000.00 67,500.00
Tukang Besi 0.2000 Oh 60,000.00 12,000.00
Mandor 0.0200 Oh 70,000.00 1,400.00
Jumlah Pekerja 80,900.00
Jumlah Bahan + Pekerja 316,900.00
Keuntungan Max. 10 % 31,690.00
Jumlah Total 348,590.00
Dibulatkan 348,500.00
A.04.01 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
BAHAN :
Besi Beton (Polos / ulir) 1.0500 kg 11,500.00 12,075.00
Kawat Beton 0.0150 kg 18,000.00 270.00
Jumlah Bahan 12,345.00
UPAH :
Pekerja 0.0070 Oh 45,000.00 315.00
Tukang Besi 0.0070 Oh 60,000.00 420.00
Kepala Tukang 0.0007 Oh 65,000.00 45.50
Mandor 0.0004 Oh 70,000.00 28.00
Jumlah Pekerja 808.50
Jumlah Bahan + Pekerja 13,153.50
Keuntungan Max. 10 % 1,315.35
Jumlah Total 14,468.85
Dibulatkan 14,400.00
Page 36
1 2 3 4 5 6=(3x5)
A.04.01.1 1 Kg PEMBESIAN DENGAN BESI U.24
BAHAN :
Besi Beton U.24 1.0500 kg 11,500.00 12,075.00
Kawat Beton 0.0150 kg 18,000.00 270.00
Jumlah Bahan 12,345.00
UPAH :
Pekerja 0.0070 Oh 45,000.00 315.00
Tukang Besi 0.0070 Oh 60,000.00 420.00
Kepala Tukang 0.0007 Oh 65,000.00 45.50
Mandor 0.0004 Oh 70,000.00 28.00
Jumlah Pekerja 808.50
Jumlah Bahan + Pekerja 13,153.50
Keuntungan Max. 10 % 1,315.35
Jumlah Total 14,468.85
Dibulatkan 14,400.00
A.04.01.2 1 Kg PEMBESIAN DENGAN BESI U.32
BAHAN :
Besi Beton U.32 1.0500 kg 11,500.00 12,075.00
Kawat Beton 0.0150 kg 18,000.00 270.00
Jumlah Bahan 12,345.00
UPAH :
Pekerja 0.0070 Oh 45,000.00 315.00
Tukang Besi 0.0070 Oh 60,000.00 420.00
Kepala Tukang 0.0007 Oh 65,000.00 45.50
Mandor 0.0004 Oh 70,000.00 28.00
Jumlah Pekerja 808.50
Jumlah Bahan + Pekerja 13,153.50
Keuntungan Max. 10 % 1,315.35
Jumlah Total 14,468.85
Dibulatkan 14,400.00
A.04.02.1 1 M2 PASANG BEKISTING UNTUK PONDASI 2 X PAKAI
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.3000 m³ 18,000.00 5,400.00
Minyak Bekisting 0.1000 ltr 3,500.00 350.00
Jumlah Bahan 43,750.00
UPAH :
Pekerja 0.5200 Oh 45,000.00 23,400.00
Tukang Kayu 0.2600 Oh 60,000.00 15,600.00
Kepala Tukang 0.0260 Oh 65,000.00 1,690.00
Mandor 0.0260 Oh 70,000.00 1,820.00
Jumlah Pekerja 42,510.00
Jumlah Bahan + Pekerja 86,260.00
Keuntungan Max. 10 % 8,626.00
Jumlah Total 94,886.00
Dibulatkan 94,800.00
Page 37
1 2 3 4 5 6=(3x5)
A.04.03.1 1 M2 PASANG BEKISTING UNTUK SLOOF 2 X PAKAI
BAHAN :
Kayu Terentang Albasiah, Papan 0.0225 m³ 1,900,000.00 42,750.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.3000 m³ 18,000.00 5,400.00
Minyak Bekisting 0.1000 m³ 3,500.00 350.00
Jumlah Bahan 48,500.00
UPAH :
Pekerja 0.5200 Oh 45,000.00 23,400.00
Tukang Kayu 0.2600 Oh 60,000.00 15,600.00
Kepala Tukang 0.0260 Oh 65,000.00 1,690.00
Mandor 0.0260 Oh 70,000.00 1,820.00
Jumlah Pekerja 42,510.00
Jumlah Bahan + Pekerja 91,010.00
Keuntungan Max. 10 % 9,101.00
Jumlah Total 100,111.00
Dibulatkan 100,100.00
A.04.04.1 1 M2 PASANG BEKISTING UNTUK KOLOM 2 X PAKAI
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0075 m³ 2,200,000.00 16,500.00
Triplek 4 mm 0.1750 lbr 60,000.00 10,500.00
Bambu 2.0000 btg 7,000.00 14,000.00
Jumlah Bahan 86,900.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 140,855.00
Keuntungan Max. 10 % 14,085.50
Jumlah Total 154,940.50
Dibulatkan 154,900.00
A.04.05.1 1 M2 PASANG BEKISTING UNTUK BALOK 2 x PAKAI (NON EXPOSED)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0090 m³ 2,200,000.00 19,800.00
Kaso Bahan Kayu Perancah 0.0200 m³ 1,750,000.00 35,000.00
Jumlah Bahan 100,700.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 154,655.00
Keuntungan Max. 10 % 15,465.50
Jumlah Total 170,120.50
Dibulatkan 170,100.00
Page 38
1 2 3 4 5 6=(3x5)
A.04.05.2 1 M2 PASANG BEKISTING UNTUK BALOK 2 x PAKAI (EXPOSED)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0090 m³ 2,200,000.00 19,800.00
Triplek 4 mm 0.3500 lbr 60,000.00 21,000.00
Kaso Bahan Kayu Perancah 0.0200 m³ 1,750,000.00 35,000.00
Jumlah Bahan 121,700.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 175,655.00
Keuntungan Max. 10 % 17,565.50
Jumlah Total 193,220.50
Dibulatkan 193,200.00
A.04.06.1 1 M2 PASANG BEKISTING UNTUK LANTAI 2 x PAKAI (NON EXPOSED)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0075 m³ 2,200,000.00 16,500.00
Kaso Bahan Kayu Perancah 0.0600 m³ 1,750,000.00 105,000.00
Jumlah Bahan 167,400.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 221,355.00
Keuntungan Max. 10 % 22,135.50
Jumlah Total 243,490.50
Dibulatkan 243,400.00
A.04.06.2 1 M2 PASANG BEKISTING UNTUK LANTAI 2 x PAKAI ( EXPOSED)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0075 m³ 2,200,000.00 16,500.00
Triplek 4 mm 0.1750 lbr 120,000.00 21,000.00
Dolken Kayu Galam Ø - 8 - 10 / 4 m 0.0600 btg 1,750,000.00 105,000.00
Jumlah Bahan 188,400.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 242,355.00
Keuntungan Max. 10 % 24,235.50
Jumlah Total 266,590.50
Dibulatkan 266,500.00
Page 39
1 2 3 4 5 6=(3x5)
A.04.07 1 M2 PASANG BEKISTING UNTUK DINDING
BAHAN :
Kayu Terentang Albasiah, Papan 0.0300 m³ 1,900,000.00 57,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0200 m³ 2,200,000.00 44,000.00
Multiplek t = 9 mm 0.3500 lbr 120,000.00 42,000.00
Dolken Kayu Galam Ø - 8 - 10 / 4 m 3.0000 btg 75,000.00 225,000.00
Jumlah Bahan 375,900.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 429,855.00
Keuntungan Max. 10 % 42,985.50
Jumlah Total 472,840.50
Dibulatkan 472,800.00
A.04.08 1 M2 PASANG BEKISTING UNTUK TANGGA
BAHAN :
Kayu Terentang Albasiah, Papan 0.0300 m³ 1,900,000.00 57,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.1500 ltr 3,500.00 525.00
Balok Kayu Lokal Klas II 0.0015 m³ 2,200,000.00 3,300.00
Multiplek t = 9 mm 0.3500 lbr 120,000.00 42,000.00
Dolken Kayu Galam Ø - 8 - 10 / 4 m 2.0000 btg 75,000.00 150,000.00
Jumlah Bahan 260,025.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 313,980.00
Keuntungan Max. 10 % 31,398.00
Jumlah Total 345,378.00
Dibulatkan 345,300.00
A.04.08.1 1 M2 PASANG BEKISTING UNTUK TANGGA
BAHAN :
Kayu Terentang Albasiah, Papan 0.0300 m³ 1,900,000.00 57,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.1500 ltr 3,500.00 525.00
Balok Kayu Lokal Klas II 0.0015 m³ 2,200,000.00 3,300.00
Kaso Bahan Kayu Perancah 0.0200 m³ 1,750,000.00 35,000.00
Jumlah Bahan 103,025.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 156,980.00
Keuntungan Max. 10 % 15,698.00
Jumlah Total 172,678.00
Dibulatkan 172,600.00
Page 40
1 2 3 4 5 6=(3x5)
A.04.10.0 1 M3 MEMBUAT BETON DENGAN MUTU K 175
BAHAN :
Semen Portland 232.0000 kg 1,360.00 315,520.00
Pasir Beton 0.5400 m³ 135,000.00 72,900.00
Batu Pecah Mesin 2/3 0.8100 m³ 175,000.00 141,750.00
Jumlah Bahan 530,170.00
UPAH :
Pekerja 6.0000 Oh 45,000.00 270,000.00
Tukang Batu 1.0000 Oh 60,000.00 60,000.00
Kepala Tukang 0.1000 Oh 65,000.00 6,500.00
Mandor 0.3000 Oh 70,000.00 21,000.00
Jumlah Pekerja 357,500.00
Jumlah Bahan + Pekerja 887,670.00
Keuntungan Max. 10 % 88,767.00
Jumlah Total 976,437.00
Dibulatkan 976,400.00
A.04.10 1 M3 MEMBUAT BETON DENGAN MUTU K 225
BAHAN :
Semen Portland 388.0000 kg 1,360.00 527,680.00
Pasir Beton 0.6500 m³ 135,000.00 87,750.00
Batu Pecah Mesin 2/3 0.6500 m³ 175,000.00 113,750.00
Jumlah Bahan 729,180.00
UPAH :
Pekerja 6.0000 Oh 45,000.00 270,000.00
Tukang Batu 1.0000 Oh 60,000.00 60,000.00
Kepala Tukang 0.1000 Oh 65,000.00 6,500.00
Mandor 0.3000 Oh 70,000.00 21,000.00
Jumlah Pekerja 357,500.00
Jumlah Bahan + Pekerja 1,086,680.00
Keuntungan Max. 10 % 108,668.00
Jumlah Total 1,195,348.00
Dibulatkan 1,195,300.00
A.04.14 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen Portland 218.0000 kg 1,360.00 296,480.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.8700 m³ 175,000.00 152,250.00
Jumlah Bahan 518,930.00
UPAH :
Pekerja 1.6500 Oh 45,000.00 74,250.00
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Kepala Tukang 0.0250 Oh 65,000.00 1,625.00
Mandor 0.0800 Oh 70,000.00 5,600.00
Jumlah Pekerja 96,475.00
Jumlah Bahan + Pekerja 615,405.00
Keuntungan Max. 10 % 61,540.50
Jumlah Total 676,945.50
Dibulatkan 676,900.00
A.04.PB1 1 M3PEKERJAAN PONDASI BETON (PB1)
BAHAN :
Pek. Besi Beton U 24 kg 14,400.00 -
Pek. Besi Beton U 32/39 88.1610 kg 14,400.00 1,269,518.40
Pek. Bekisting (2 x pakai) 1.1750 m2 94,800.00 111,390.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 2,576,208.40
Dibulatkan 2,576,200.00
Page 41
1 2 3 4 5 6=(3x5)
A.04.PB2 1 M3PEKERJAAN PONDASI BETON (PB2)
BAHAN :
Pek. Besi Beton U 24 - kg 14,400.00 -
Pek. Besi Beton U 32/39 163.1200 kg 14,400.00 2,348,928.00
Pek. Bekisting (2 x pakai) 3.4000 m2 94,800.00 322,320.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,866,548.00
Dibulatkan 3,866,500.00
A.04.SL1 1 M3PEKERJAAN SLOOF SL1 20 X 35
BAHAN :
Pek. Besi Beton U 24 30.8570 kg 14,400.00 444,340.80
Pek. Besi Beton U 32/39 150.0000 kg 14,400.00 2,160,000.00
Pek. Bekisting (2 x pakai) 3.4000 m2 100,100.00 340,340.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,139,980.80
Dibulatkan 4,139,900.00
A.04.SL2 1 M3PEKERJAAN SLOOF SL2 20 X 30
BAHAN :
Pek. Besi Beton U 24 32.0000 kg 14,400.00 460,800.00
Pek. Besi Beton U 32/39 87.5000 kg 14,400.00 1,260,000.00
Pek. Bekisting (2 x pakai) 3.4000 m2 100,100.00 340,340.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,256,440.00
Dibulatkan 3,256,400.00
A.04.SL3 1 M3PEKERJAAN SLOOF SL3 15 X 25
BAHAN :
Pek. Besi Beton U 24 40.9600 kg 14,400.00 589,824.00
Pek. Besi Beton U 32/39 112.0000 kg 14,400.00 1,612,800.00
Pek. Bekisting (2 x pakai) 3.4000 m2 100,100.00 340,340.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,738,264.00
Dibulatkan 3,738,200.00
A.04.KB1A 1 M3PEKERJAAN KOLOM BAWAH (KB1A) 30 X 30
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 115.9000 kg 14,400.00 1,668,960.00
Pek. Bekisting (2 x pakai) 6.6670 m2 154,900.00 1,032,718.30
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,339,346.30
Dibulatkan 4,339,300.00
A.04.KB1B 1 M3PEKERJAAN KOLOM BAWAH (KB1B) 25 X 25
BAHAN :
Pek. Besi Beton U 24 42.3400 kg 14,400.00 609,696.00
Pek. Besi Beton U 32/39 166.9000 kg 14,400.00 2,403,360.00
Pek. Bekisting (2 x pakai) 13.2000 m2 154,900.00 2,044,680.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 6,253,036.00
Dibulatkan 6,253,000.00
Page 42
1 2 3 4 5 6=(3x5)
A.04.KB2 1 M3PEKERJAAN KOLOM BAWAH (KB2) 13 X 13
BAHAN :
Pek. Besi Beton U 24 186.8900 kg 14,400.00 2,691,216.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 7.6900 m2 154,900.00 1,191,181.00
Pek. Beton K.175 1.0000 m3 976,400.00 976,400.00
Jumlah Total 4,858,797.00
Dibulatkan 4,858,700.00
A.04.KB3 1 M3PEKERJAAN KOLOM BAWAH (KB3) 23 X 65
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 118.7900 kg 14,400.00 1,710,576.00
Pek. Bekisting (2 x pakai) 9.2300 m2 154,900.00 1,429,727.00
Pek. Beton K.175 1.0000 m3 976,400.00 976,400.00
Jumlah Total 4,559,071.00
Dibulatkan 4,559,000.00
A.04.KB4 1 M3PEKERJAAN KOLOM BAWAH (KB4) 25 X 25
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 83.4500 kg 14,400.00 1,201,680.00
Pek. Bekisting (2 x pakai) 8.0000 m2 154,900.00 1,239,200.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,078,548.00
Dibulatkan 4,078,500.00
A.04.KA1 1 M3PEKERJAAN KOLOM ATAS (KA1) 25 X 25
BAHAN :
Pek. Besi Beton U 24 42.8800 kg 14,400.00 617,472.00
Pek. Besi Beton U 32/39 115.6600 kg 14,400.00 1,665,504.00
Pek. Bekisting (2 x pakai) 8.0000 m2 154,900.00 1,239,200.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,717,476.00
Dibulatkan 4,717,400.00
A.04.KA2 1 M3PEKERJAAN KOLOM ATAS (KA2) 20 X 20
BAHAN :
Pek. Besi Beton U 24 40.3200 kg 14,400.00 580,608.00
Pek. Besi Beton U 32/39 105.0000 kg 14,400.00 1,512,000.00
Pek. Bekisting (2 x pakai) 10.0000 m2 154,900.00 1,549,000.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,836,908.00
Dibulatkan 4,836,900.00
A.04.KA3 1 M3PEKERJAAN KOLOM ATAS (KA3) 13 X 13
BAHAN :
Pek. Besi Beton U 24 186.8900 kg 14,400.00 2,691,216.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 7.6900 m2 154,900.00 1,191,181.00
Pek. Beton K.175 1.0000 m3 1,208,900.00 1,208,900.00
Jumlah Total 5,091,297.00
Dibulatkan 5,091,200.00
Page 43
1 2 3 4 5 6=(3x5)
A.04.KA4 1 M3PEKERJAAN KOLOM ATAS (KA4) 23 X 65
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 118.7900 kg 14,400.00 1,710,576.00
Pek. Bekisting (2 x pakai) 9.2300 m2 154,900.00 1,429,727.00
Pek. Beton K.175 1.0000 m3 1,208,900.00 1,208,900.00
Jumlah Total 4,791,571.00
Dibulatkan 4,791,500.00
A.04.KA4 1 M3PEKERJAAN KOLOM ATAS (KA4) 25 X 25
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 83.4500 kg 14,400.00 1,201,680.00
Pek. Bekisting (2 x pakai) 16.0000 m2 154,900.00 2,478,400.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,317,748.00
Dibulatkan 5,317,700.00
A.04.BL1 1 M3PEKERJAAN BALOK LANTAI 25 X 50 (BL1)
BAHAN :
Pek. Besi Beton U 24 41.1600 kg 14,400.00 592,704.00
Pek. Besi Beton U 32/39 95.4240 kg 14,400.00 1,374,105.60
Pek. Bekisting (2 x pakai) 4.0000 m2 170,100.00 680,400.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,842,509.60
Dibulatkan 3,842,500.00
A.04.BL2 1 M3PEKERJAAN BALOK LANTAI 20 X 40 (BL2)
BAHAN :
Pek. Besi Beton U 24 54.8630 kg 14,400.00 790,027.20
Pek. Besi Beton U 32/39 105.0000 kg 14,400.00 1,512,000.00
Pek. Bekisting (2 x pakai) 4.7500 m2 170,100.00 807,975.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,305,302.20
Dibulatkan 4,305,300.00
A.04.BL3 1 M3PEKERJAAN BALOK LANTAI 20 X 35 (BL3)
BAHAN :
Pek. Besi Beton U 24 32.4000 kg 14,400.00 466,560.00
Pek. Besi Beton U 32/39 120.0000 kg 14,400.00 1,728,000.00
Pek. Bekisting (2 x pakai) 9.7143 m2 170,100.00 1,652,402.43
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,042,262.43
Dibulatkan 5,042,200.00
Page 44
1 2 3 4 5 6=(3x5)
A.04.BL4 1 M3PEKERJAAN BALOK LANTAI 20 X 30 (BL4)
BAHAN :
Pek. Besi Beton U 24 33.6000 kg 14,400.00 483,840.00
Pek. Besi Beton U 32/39 87.5000 kg 14,400.00 1,260,000.00
Pek. Bekisting (2 x pakai) 5.6670 m2 170,100.00 963,956.70
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,903,096.70
Dibulatkan 3,903,000.00
A.04.BL5 1 M3PEKERJAAN BALOK LANTAI 15 X 25 (BL5)
BAHAN :
Pek. Besi Beton U 24 43.0080 kg 14,400.00 619,315.20
Pek. Besi Beton U 32/39 112.0000 kg 14,400.00 1,612,800.00
Pek. Bekisting (2 x pakai) 5.4667 m2 170,100.00 929,885.67
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,357,300.87
Dibulatkan 4,357,300.00
A.04.B1 1 M3PEKERJAAN BALOK 13 x 13 ( B1)
BAHAN :
Pek. Besi Beton U 24 186.8900 kg 14,400.00 2,691,216.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 7.6900 m2 170,100.00 1,308,069.00
Pek. Beton K.225 1.0000 m3 976,400.00 976,400.00
Jumlah Total 4,975,685.00
Dibulatkan 4,975,600.00
A.04.B2 1 M3PEKERJAAN BALOK 15 x 25 ( B2)
BAHAN :
Pek. Besi Beton U 24 33.6000 kg 14,400.00 483,840.00
Pek. Besi Beton U 32/39 186.3200 kg 14,400.00 2,683,008.00
Pek. Bekisting (2 x pakai) 6.6700 m2 170,100.00 1,134,567.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,496,715.00
Dibulatkan 5,496,700.00
A.04.B3 1 M3PEKERJAAN BALOK 15 x 20 ( B3)
BAHAN :
Pek. Besi Beton U 24 38.2400 kg 14,400.00 550,656.00
Pek. Besi Beton U 32/39 192.3500 kg 14,400.00 2,769,840.00
Pek. Bekisting (2 x pakai) 8.8890 m2 170,100.00 1,512,018.90
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 6,027,814.90
Dibulatkan 6,027,800.00
A.04.RB1 1 M3PEKERJAAN RING BALOK 20 x 30 ( RB1)
BAHAN :
Pek. Besi Beton U 24 171.6400 kg 14,400.00 2,471,616.00
Pek. Besi Beton U 32/39 87.5000 kg 14,400.00 1,260,000.00
Pek. Bekisting (2 x pakai) 13.3300 m2 170,100.00 2,267,433.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 7,194,349.00
Dibulatkan 7,194,300.00
Page 45
1 2 3 4 5 6=(3x5)
A.04.RB2 1 M3PEKERJAAN RING BALOK 15 x 25 ( RB2)
BAHAN :
Pek. Besi Beton U 24 43.0080 kg 14,400.00 619,315.20
Pek. Besi Beton U 32/39 112.0000 kg 14,400.00 1,612,800.00
Pek. Bekisting (2 x pakai) 13.3300 m2 170,100.00 2,267,433.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,694,848.20
Dibulatkan 5,694,800.00
A.04.B4 1 M3PEKERJAAN BALOK 20 X 30 (B4)
BAHAN :
Pek. Besi Beton U 24 33.6000 kg 14,400.00 483,840.00
Pek. Besi Beton U 32/39 87.5000 kg 14,400.00 1,260,000.00
Pek. Bekisting (2 x pakai) 13.3300 m2 170,100.00 2,267,433.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,206,573.00
Dibulatkan 5,206,500.00
A.04.PLT12 1 M3PEKERJAAN LANTAI T=12 CM
BAHAN :
Pek. Besi Beton U 24 130.2000 kg 14,400.00 1,874,880.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 8.3330 m2 243,400.00 2,028,252.20
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,098,432.20
Dibulatkan 5,098,400.00
A.04.PLT10 1 M3PEKERJAAN LANTAI T=10 CM
BAHAN :
Pek. Besi Beton U 24 117.1800 kg 14,400.00 1,687,392.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 10.0000 m2 243,400.00 2,434,000.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,316,692.00
Dibulatkan 5,316,600.00
A.04.PLT8 1 M3PEKERJAAN LANTAI T=8 CM
BAHAN :
Pek. Besi Beton U 24 94.5000 kg 14,400.00 1,360,800.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 6.6700 m2 243,400.00 1,623,478.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,179,578.00
Dibulatkan 4,179,500.00
A.04.PLT7 1 M3PEKERJAAN LANTAI T=7 CM
BAHAN :
Pek. Besi Beton U 24 94.5000 kg 14,400.00 1,360,800.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 7.1400 m2 243,400.00 1,737,876.00
Pek. Beton K.225 1.0000 m3 976,400.00 976,400.00
Jumlah Total 4,075,076.00
Dibulatkan 4,075,000.00
Page 46
1 2 3 4 5 6=(3x5)
A.04.17 1 M3 MEMBUAT PONDASI BETON BERTULANG (157.5000 kg BESI + BEKISTNG)
BAHAN :
Kayu Terentang Albasiah, Papan 0.2000 m³ 1,900,000.00 380,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 1.5000 kg 18,000.00 27,000.00
Minyak Bekisting 0.4000 ltr 3,500.00 1,400.00
Besi Beton Polos 157.5000 kg 11,500.00 1,811,250.00
Kawat Beton 2.3000 kg 18,000.00 41,400.00
Semen Portland 336.0000 kg 1,360.00 456,960.00
Pasir Beton 0.5400 m³ 135,000.00 72,900.00
Batu Pecah Mesin 2/3 0.8100 m³ 175,000.00 141,750.00
Jumlah Bahan 2,932,660.00
UPAH :
Pekerja 5.3000 Oh 45,000.00 238,500.00
Tukang Batu 0.2750 Oh 60,000.00 16,500.00
Tukang Kayu 1.3000 Oh 60,000.00 78,000.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2620 Oh 65,000.00 17,030.00
Mandor 0.2650 Oh 70,000.00 18,550.00
Jumlah Pekerja 431,580.00
Jumlah Bahan + Pekerja 3,364,240.00
Keuntungan Max. 10 % 336,424.00
Jumlah Total 3,700,664.00
Dibulatkan 3,700,600.00
A.04.17 P1 1 M3 MEMBUAT PONDASI BETON BERTULANG 1,25 x 1,25 TULANGAN DIA 12 (111,7437 kg BESI + BEKISTNG)
BAHAN :
Kayu Terentang Albasiah, Papan 0.1025 m³ 1,900,000.00 194,713.92
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 1.5000 kg 18,000.00 27,000.00
Minyak Bekisting 0.4000 ltr 3,500.00 1,400.00
Besi Beton Polos 111.7437 kg 11,500.00 1,285,052.12
Kawat Beton 2.3000 kg 18,000.00 41,400.00
Semen Portland 336.0000 kg 1,360.00 456,960.00
Pasir Beton 0.5400 m³ 135,000.00 72,900.00
Batu Pecah Mesin 2/3 0.8100 m³ 175,000.00 141,750.00
Jumlah Bahan 2,221,176.05
UPAH :
Pekerja 5.3000 Oh 45,000.00 238,500.00
Tukang Batu 0.2750 Oh 60,000.00 16,500.00
Tukang Kayu 1.3000 Oh 60,000.00 78,000.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2620 Oh 65,000.00 17,030.00
Mandor 0.2650 Oh 70,000.00 18,550.00
Jumlah Pekerja 431,580.00
Jumlah Bahan + Pekerja 2,652,756.05
Keuntungan Max. 10 % 265,275.60
Jumlah Total 2,918,031.65
Dibulatkan 2,918,000.00
Page 47
1 2 3 4 5 6=(3x5)
A.04.17 P2 1 M3 MEMBUAT PONDASI BETON BERTULANG 0,80 X 0,80 TULANGAN DIA 12 (126,2854 kg BESI + BEKISTNG)
BAHAN :
Kayu Terentang Albasiah, Papan 0.2000 m³ 1,900,000.00 380,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 1.5000 kg 18,000.00 27,000.00
Minyak Bekisting 0.4000 ltr 3,500.00 1,400.00
Besi Beton Polos 95.4665 kg 11,500.00 1,097,864.35
Kawat Beton 2.3000 kg 18,000.00 41,400.00
Semen Portland 336.0000 kg 1,360.00 456,960.00
Pasir Beton 0.5400 m³ 135,000.00 72,900.00
Batu Pecah Mesin 2/3 0.8100 m³ 175,000.00 141,750.00
Jumlah Bahan 2,219,274.35
UPAH :
Pekerja 5.3000 Oh 45,000.00 238,500.00
Tukang Batu 0.2750 Oh 60,000.00 16,500.00
Tukang Kayu 1.3000 Oh 60,000.00 78,000.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2620 Oh 65,000.00 17,030.00
Mandor 0.2650 Oh 70,000.00 18,550.00
Jumlah Pekerja 431,580.00
Jumlah Bahan + Pekerja 2,650,854.35
Keuntungan Max. 10 % 265,085.43
Jumlah Total 2,915,939.78
Dibulatkan 2,915,900.00
A.04.18 1 M3 MEMBUAT SLOOF 10/15 (204.4000 Kg Besi + Bekisting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekisting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.0000 kg 18,000.00 108,000.00
Minyak Bekisting 2.0000 ltr 3,500.00 7,000.00
Besi Beton Polos U 24 204.4000 kg 11,500.00 2,350,600.00
Kawat Beton 3.0700 kg 18,000.00 55,260.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,926,840.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,232,740.00
Keuntungan Max. 10 % 423,274.00
Jumlah 4,656,014.00
Dibulatkan 4,656,000.00
Page 48
1 2 3 4 5 6=(3x5)
A.04.19 1 M3 MEMBUAT SLOOF 12/15 (172.9000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekisting Albasiah 0.3300 m³ 1,900,000.00 627,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.0000 kg 18,000.00 90,000.00
Minyak Bekisting 1.6700 ltr 3,500.00 5,845.00
Besi Beton Polos U 24 172.9000 kg 11,500.00 1,988,350.00
Kawat Beton 2.5900 kg 18,000.00 46,620.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,403,795.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,709,695.00
Keuntungan Max. 10 % 370,969.50
Jumlah 4,080,664.50
Dibulatkan 4,080,660.00
A.04.20 1 M3 MEMBUAT SLOOF 12/15 (259,0000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekisting Albasiah 0.3300 m³ 1,900,000.00 627,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.0000 kg 18,000.00 90,000.00
Minyak Bekisting 1.6700 ltr 3,500.00 5,845.00
Besi Beton Polos U 24 259.0000 kg 11,500.00 2,978,500.00
Kawat Beton 3.8900 kg 18,000.00 70,020.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,417,345.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,723,245.00
Keuntungan Max. 10 % 472,324.50
Jumlah 5,195,569.50
Dibulatkan 5,195,500.00
Page 49
1 2 3 4 5 6=(3x5)
A.04.21 1 M3 MEMBUAT SLOOF 15/20 (117.6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekisting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.0000 kg 18,000.00 72,000.00
Minyak Bekisting 1.3300 ltr 3,500.00 4,655.00
Besi Beton Polos U 24 117.6000 kg 11,500.00 1,352,400.00
Kawat Beton 1.7600 kg 18,000.00 31,680.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,619,715.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,925,615.00
Keuntungan Max. 10 % 292,561.50
Jumlah 3,218,176.50
Dibulatkan 3,218,100.00
A.04.22 1 M3 MEMBUAT SLOOF 15/20 (180,6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekisting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.0000 kg 18,000.00 72,000.00
Minyak Bekisting 1.3300 ltr 3,500.00 4,655.00
Besi Beton Polos U 24 180.6000 kg 11,500.00 2,076,900.00
Kawat Beton 2.7100 kg 18,000.00 48,780.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,361,315.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,667,215.00
Keuntungan Max. 10 % 366,721.50
Jumlah 4,033,936.50
Dibulatkan 4,033,900.00
Page 50
1 2 3 4 5 6=(3x5)
A.04.22.a 1 M3 MEMBUAT SLOOF 15/20 (146,6843 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekisting Albasiah 0.3067 m³ 1,900,000.00 582,666.67
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.0000 kg 18,000.00 72,000.00
Minyak Bekisting 1.3300 ltr 3,500.00 4,655.00
Besi Beton Polos U 24 146.6843 kg 11,500.00 1,686,869.20
Kawat Beton 2.7100 kg 18,000.00 48,780.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,040,950.87
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,346,850.87
Keuntungan Max. 10 % 334,685.09
Jumlah 3,681,535.96
Dibulatkan 3,681,500.00
A.04.23 1 M3 MEMBUAT SLOOF 25/30 (112.0900 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.1600 m³ 1,900,000.00 304,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 2.4000 kg 18,000.00 43,200.00
Minyak Bekisting 0.8000 ltr 3,500.00 2,800.00
Besi Beton Polos U 24 112.0900 kg 11,500.00 1,289,035.00
Kawat Beton 1.6800 kg 18,000.00 30,240.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,315,255.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,621,155.00
Keuntungan Max. 10 % 262,115.50
Jumlah 2,883,270.50
Dibulatkan 2,883,200.00
Page 51
1 2 3 4 5 6=(3x5)
A.04.24 1 M3 MEMBUAT SLOOF 20/30 (154,0431 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.2000 m³ 1,900,000.00 380,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 3.0000 kg 18,000.00 54,000.00
Minyak Bekisting 1.0000 ltr 3,500.00 3,500.00
Besi Beton Polos U 24 157.0431 kg 11,500.00 1,805,995.57
Kawat Beton 1.8700 kg 18,000.00 33,660.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,923,135.57
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,229,035.57
Keuntungan Max. 10 % 322,903.56
Jumlah 3,551,939.12
Dibulatkan 3,551,900.00
A.04.25 1 M3 MEMBUAT KOLOM 12/12 (211.2900 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3700 m³ 1,900,000.00 703,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.6600 kg 18,000.00 119,880.00
Minyak Bekisting 3.3200 ltr 3,500.00 11,620.00
Besi Beton Polos U 24 211.2900 kg 11,500.00 2,429,835.00
Kawat Beton 3.1700 kg 18,000.00 57,060.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,967,375.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,273,275.00
Keuntungan Max. 10 % 427,327.50
Jumlah 4,700,602.50
Dibulatkan 4,700,600.00
Page 52
1 2 3 4 5 6=(3x5)
A.04.26 1 M3 MEMBUAT KOLOM 12/12 (314.9700 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3700 m³ 1,900,000.00 703,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.6600 kg 18,000.00 119,880.00
Minyak Bekisting 3.3200 ltr 3,500.00 11,620.00
Besi Beton Polos U 24 314.9700 kg 11,500.00 3,622,155.00
Kawat Beton 4.7200 kg 18,000.00 84,960.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 5,187,595.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 5,493,495.00
Keuntungan Max. 10 % 549,349.50
Jumlah 6,042,844.50
Dibulatkan 6,042,800.00
A.04.27 1 M3 MEMBUAT KOLOM 15/15 (141.3800 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3000 m³ 1,900,000.00 570,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 18,000.00 95,940.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 141.3800 kg 11,500.00 1,625,870.00
Kawat Beton 2.1200 kg 18,000.00 38,160.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,985,295.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,291,195.00
Keuntungan Max. 10 % 329,119.50
Jumlah 3,620,314.50
Dibulatkan 3,620,300.00
Page 53
1 2 3 4 5 6=(3x5)
A.04.28 1 M3 MEMBUAT KOLOM 15/15 (223,4100 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3000 m³ 1,900,000.00 570,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 18,000.00 95,940.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 223.4100 kg 11,500.00 2,569,215.00
Kawat Beton 3.3500 kg 18,000.00 60,300.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,950,780.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,256,680.00
Keuntungan Max. 10 % 425,668.00
Jumlah 4,682,348.00
Dibulatkan 4,682,300.00
A.04.28.a 1 M3 MEMBUAT KOLOM 15/15 (200,8625 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.9600 m³ 1,900,000.00 1,824,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 18,000.00 95,940.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 200.8625 kg 11,500.00 2,309,918.25
Kawat Beton 3.3500 kg 18,000.00 60,300.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,945,483.25
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 5,251,383.25
Keuntungan Max. 10 % 525,138.33
Jumlah 5,776,521.58
Dibulatkan 5,776,500.00
Page 54
1 2 3 4 5 6=(3x5)
A.04.29 1 M3 MEMBUAT KOLOM 15/20 (117.5900 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4600 m³ 1,900,000.00 874,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6600 ltr 3,500.00 16,310.00
Besi Beton Polos U 24 117.5900 kg 11,500.00 1,352,285.00
Kawat Beton 1.6800 kg 18,000.00 30,240.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,086,755.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,392,655.00
Keuntungan Max. 10 % 339,265.50
Jumlah 3,731,920.50
Dibulatkan 3,731,900.00
A.04.30 1 M3 MEMBUAT KOLOM 15/20 (180,5700 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4600 m³ 1,900,000.00 874,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6600 ltr 3,500.00 16,310.00
Besi Beton Polos U 24 180.5700 kg 11,500.00 2,076,555.00
Kawat Beton 2.7000 kg 18,000.00 48,600.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,829,385.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,135,285.00
Keuntungan Max. 10 % 413,528.50
Jumlah 4,548,813.50
Dibulatkan 4,548,800.00
Page 55
1 2 3 4 5 6=(3x5)
A.04.30.a 1 M3 MEMBUAT KOLOM 15/20 (157,3757 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.8200 m³ 1,900,000.00 1,558,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6600 ltr 3,500.00 16,310.00
Besi Beton Polos U 24 157.3757 kg 11,500.00 1,809,820.00
Kawat Beton 2.7000 kg 18,000.00 48,600.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,246,650.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,552,550.00
Keuntungan Max. 10 % 455,255.00
Jumlah 5,007,805.00
Dibulatkan 5,007,800.00
A.04.30.K4 1 M3 MEMBUAT KOLOM 15/20 (182,5451 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4025 m³ 1,900,000.00 764,788.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6600 ltr 3,500.00 16,310.00
Besi Beton Polos U 24 42.5451 kg 11,500.00 489,268.13
Besi Beton Polos U 39 140.0000 kg 18,000.00 2,520,000.00
Kawat Beton 2.7000 kg 18,000.00 48,600.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,652,886.13
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,958,786.13
Keuntungan Max. 10 % 495,878.61
Jumlah 5,454,664.75
Dibulatkan 5,454,600.00
Page 56
1 2 3 4 5 6=(3x5)
A.04.31 1 M3 MEMBUAT KOLOM 15/30 (132,4000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 132.4000 kg 11,500.00 1,522,600.00
Kawat Beton 1.9900 kg 18,000.00 35,820.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,122,400.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,428,300.00
Keuntungan Max. 10 % 342,830.00
Jumlah 3,771,130.00
Dibulatkan 3,771,100.00
A.04.32 1 M3 MEMBUAT KOLOM 20/20 (92.0500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 92.0500 kg 11,500.00 1,058,575.00
Kawat Beton 1.3800 kg 18,000.00 24,840.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,647,395.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,953,295.00
Keuntungan Max. 10 % 295,329.50
Jumlah 3,248,624.50
Dibulatkan 3,248,600.00
Page 57
1 2 3 4 5 6=(3x5)
A.04.33 1 M3 MEMBUAT KOLOM 20/20 (142,4500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 142.4500 kg 11,500.00 1,638,175.00
Kawat Beton 2.1400 kg 18,000.00 38,520.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,240,675.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,546,575.00
Keuntungan Max. 10 % 354,657.50
Jumlah 3,901,232.50
Dibulatkan 3,901,200.00
A.04.33.K3 1 M3 MEMBUAT KOLOM 20/20 (128,6492 Kg Besi + Bekesting)
DENGAN TULANGAN 5 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2447 m³ 1,900,000.00 464,835.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 36.2492 kg 11,500.00 416,865.23
Besi Beton Polos U 32/39 92.4000 kg 18,000.00 1,663,200.00
Kawat Beton 2.1400 kg 18,000.00 38,520.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,387,400.23
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,693,300.23
Keuntungan Max. 10 % 369,330.02
Jumlah 4,062,630.25
Dibulatkan 4,062,600.00
Page 58
1 2 3 4 5 6=(3x5)
A.04.34 1 M3 MEMBUAT KOLOM 25/25 (100.1300 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3200 m³ 1,900,000.00 608,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.4000 kg 18,000.00 115,200.00
Minyak Bekisting 3.2000 ltr 3,500.00 11,200.00
Besi Beton Polos U 24 100.1300 kg 11,500.00 1,151,495.00
Kawat Beton 1.5000 kg 18,000.00 27,000.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,558,875.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,864,775.00
Keuntungan Max. 10 % 286,477.50
Jumlah 3,151,252.50
Dibulatkan 3,151,200.00
A.04.35 1 M3 MEMBUAT KOLOM 30/30 (171,6700 Kg Besi + Bekesting)
DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 18,000.00 95,940.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 171.6700 kg 11,500.00 1,974,205.00
Kawat Beton 1.6200 kg 18,000.00 29,160.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,267,630.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,573,530.00
Keuntungan Max. 10 % 357,353.00
Jumlah 3,930,883.00
Dibulatkan 3,930,800.00
Page 59
1 2 3 4 5 6=(3x5)
A.04.36 1 M3 MEMBUAT KOLOM 25/40 (166,3200 Kg Besi + Bekesting)
DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2600 m³ 1,900,000.00 494,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.2000 kg 18,000.00 93,600.00
Minyak Bekisting 2.6000 ltr 3,500.00 9,100.00
Besi Beton Polos U 24 176.3520 kg 11,500.00 2,028,048.00
Kawat Beton 2.4900 kg 18,000.00 44,820.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,315,548.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,621,448.00
Keuntungan Max. 10 % 362,144.80
Jumlah 3,983,592.80
Dibulatkan 3,983,500.00
A.04.34.K1 1 M3 MEMBUAT KOLOM 25/35 (195,0636 Kg Besi + Bekesting)
DENGAN TULANGAN 12 BATANG DIA 13 BEUGEL DIA 8 JARAK 10 - 20 CM
BAHAN :
Bekesting Albasiah 0.4320 m³ 1,900,000.00 820,800.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 161.2200 kg 11,500.00 1,854,030.00
Besi Beton Polos U 24 33.8436 kg 11,500.00 389,201.40
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 1/2 & 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,348,417.00
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,707,842.00
Keuntungan Max. 10 % 370,784.20
Jumlah 4,078,626.20
Dibulatkan 4,078,620.00
Page 60
1 2 3 4 5 6=(3x5)
A.04.34.K2 1 M3 MEMBUAT KOLOM 25/30 (1158,7784 Kg Besi + Bekesting)
DENGAN TULANGAN 8 BATANG DIA 13 BEUGEL DIA 8 JARAK 10 - 20 CM
BAHAN :
Bekesting Albasiah 0.4640 m³ 1,900,000.00 881,600.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 124.1800 kg 11,500.00 1,428,070.00
Besi Beton Polos U 24 34.5984 kg 11,500.00 397,882.12
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 1/2 & 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,991,937.72
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,351,362.72
Keuntungan Max. 10 % 335,136.27
Jumlah 3,686,498.99
Dibulatkan 3,686,490.00
A.04.34.K3. 1 M3 MEMBUAT KOLOM 25/25 (184.34000 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 16 BEUGEL DIA 8 JARAK 10 - 20 CM
BAHAN :
Bekesting Albasiah 0.5088 m³ 1,900,000.00 966,720.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 149.7600 kg 11,500.00 1,722,240.00
Besi Beton Polos U 24 34.5830 kg 11,500.00 397,704.96
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 1/2 & 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,371,050.56
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,730,475.56
Keuntungan Max. 10 % 373,047.56
Jumlah 4,103,523.12
Dibulatkan 4,103,520.00
Page 61
1 2 3 4 5 6=(3x5)
A.04.46 ( B1 ) 1 M3 MEMBUAT BALOK 25/50 (177,1095 Kg Besi + Bekesting)
DENGAN TULANGAN 10 BATANG DIA 16 DAN 2 BATANG DIA 12 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.3144 m³ 1,900,000.00 597,360.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 147.0269 kg 11,500.00 1,690,809.12
Besi Beton Polos U 24 38.7536 kg 11,500.00 445,666.76
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 3,306,471.48
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,665,896.48
Keuntungan Max. 10 % 366,589.65
Jumlah 4,032,486.12
Dibulatkan 4,032,480.00
A.04.46 ( B2 ) 1 M3 MEMBUAT BALOK 25/50 (148,2245 Kg Besi + Bekesting)
DENGAN TULANGAN 8 BATANG DIA 16 DAN 2 BATANG DIA 12 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.3144 m³ 1,900,000.00 597,360.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 124.8000 kg 11,500.00 1,435,200.00
Besi Beton Polos U 24 33.0000 kg 11,500.00 379,500.00
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 2,984,695.60
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,344,120.60
Keuntungan Max. 10 % 334,412.06
Jumlah 3,678,532.66
Dibulatkan 3,678,530.00
Page 62
1 2 3 4 5 6=(3x5)
A.04.46 ( B3 ) 1 M3 MEMBUAT BALOK 20/30 (171,8035 Kg Besi + Bekesting) B4
DENGAN TULANGAN 5 BATANG DIA 16 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.4300 m³ 1,900,000.00 817,000.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 100.0000 kg 11,500.00 1,150,000.00
Besi Beton Polos U 24 50.3067 kg 11,500.00 578,526.67
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 3,118,162.27
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,477,587.27
Keuntungan Max. 10 % 347,758.73
Jumlah 3,825,345.99
Dibulatkan 3,825,340.00
A.04.46 ( B4 ) 1 M3 MEMBUAT BALOK 20/30 (174.1376 Kg Besi + Bekesting) B4
DENGAN TULANGAN 5 BATANG DIA 12 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.4300 m³ 1,900,000.00 817,000.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton Polos U 24 166.2223 kg 11,500.00 1,911,556.22
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 3,301,191.82
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,660,616.82
Keuntungan Max. 10 % 366,061.68
Jumlah 4,026,678.50
Dibulatkan 4,026,670.00
Page 63
1 2 3 4 5 6=(3x5)
A.04.46 ( B5 ) 1 M3 MEMBUAT BALOK 15/25 (1139.9916 Kg Besi + Bekesting)
DENGAN TULANGAN 5 BATANG DIA 10 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.5680 m³ 1,900,000.00 1,079,200.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton Polos U 24 127.7223 kg 11,500.00 1,468,806.22
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 1/2 & 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 3,120,641.82
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,480,066.82
Keuntungan Max. 10 % 348,006.68
Jumlah 3,828,073.50
Dibulatkan 3,828,070.00
A.04.37 1 M3 MEMBUAT RING BALK 10/15 (204.4000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.5300 m³ 1,900,000.00 1,007,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 10.6700 kg 18,000.00 192,060.00
Minyak Bekisting 5.3300 ltr 3,500.00 18,655.00
Besi Beton Polos U 24 204.4000 kg 11,500.00 2,350,600.00
Kawat Beton 3.0700 kg 18,000.00 55,260.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,269,555.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,575,455.00
Keuntungan Max. 10 % 457,545.50
Jumlah 5,033,000.50
Dibulatkan 5,033,000.00
Page 64
1 2 3 4 5 6=(3x5)
A.04.38 1 M3 MEMBUAT RING BALK 10/15 (280.0000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.5300 m³ 1,900,000.00 1,007,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 10.6700 kg 18,000.00 192,060.00
Minyak Bekisting 5.3300 ltr 3,500.00 18,655.00
Besi Beton Polos U 24 280.0000 kg 11,500.00 3,220,000.00
Kawat Beton 4.2000 kg 18,000.00 75,600.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 5,159,295.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 5,465,195.00
Keuntungan Max. 10 % 546,519.50
Jumlah 6,011,714.50
Dibulatkan 6,011,700.00
A.04.39 1 M3 MEMBUAT RING BALK 12/15 (172.9000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.4700 m³ 1,900,000.00 893,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6700 ltr 3,500.00 16,345.00
Besi Beton Polos U 24 172.9000 kg 11,500.00 1,988,350.00
Kawat Beton 2.5900 kg 18,000.00 46,620.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,758,235.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,064,135.00
Keuntungan Max. 10 % 406,413.50
Jumlah 4,470,548.50
Dibulatkan 4,470,500.00
Page 65
1 2 3 4 5 6=(3x5)
A.04.40 1 M3 MEMBUAT RING BALK 15/15 (141.4000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 141.4000 kg 11,500.00 1,626,100.00
Kawat Beton 2.1200 kg 18,000.00 38,160.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,228,240.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,534,140.00
Keuntungan Max. 10 % 353,414.00
Jumlah 3,887,554.00
Dibulatkan 3,887,500.00
A.04.41 1 M3 MEMBUAT RING BALK 15/15 (212,8000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 212.8000 kg 11,500.00 2,447,200.00
Kawat Beton 3.1900 kg 18,000.00 57,420.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,068,600.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,374,500.00
Keuntungan Max. 10 % 437,450.00
Jumlah 4,811,950.00
Dibulatkan 4,811,900.00
Page 66
1 2 3 4 5 6=(3x5)
A.04.42 1 M3 MEMBUAT RING BALK 15/20 (117,6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3700 m³ 1,900,000.00 703,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.3300 kg 18,000.00 131,940.00
Minyak Bekisting 3.6700 ltr 3,500.00 12,845.00
Besi Beton Polos U 24 117.6000 kg 11,500.00 1,352,400.00
Kawat Beton 1.7600 kg 18,000.00 31,680.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,877,845.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,183,745.00
Keuntungan Max. 10 % 318,374.50
Jumlah 3,502,119.50
Dibulatkan 3,502,100.00
A.04.43 1 M3 MEMBUAT RING BALK 15/20 (180,6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3700 m³ 1,900,000.00 703,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.3300 kg 18,000.00 131,940.00
Minyak Bekisting 3.6700 ltr 3,500.00 12,845.00
Besi Beton Polos U 24 180.6000 kg 11,500.00 2,076,900.00
Kawat Beton 2.7100 kg 18,000.00 48,780.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,619,445.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,925,345.00
Keuntungan Max. 10 % 392,534.50
Jumlah 4,317,879.50
Dibulatkan 4,317,800.00
Page 67
1 2 3 4 5 6=(3x5)
A.04.43.a 1 M3 MEMBUAT RING BALK 15/20 (157,3757 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.6700 m³ 1,900,000.00 1,273,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.3300 kg 18,000.00 131,940.00
Minyak Bekisting 3.6700 ltr 3,500.00 12,845.00
Besi Beton Polos U 24 157.3757 kg 11,500.00 1,809,820.00
Kawat Beton 2.7100 kg 18,000.00 48,780.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,922,365.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,228,265.00
Keuntungan Max. 10 % 422,826.50
Jumlah 4,651,091.50
Dibulatkan 4,651,000.00
A.04.44 1 M3 MEMBUAT RING BALK 15/25 ( 98.1900 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3500 m³ 1,900,000.00 665,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 18,000.00 124,740.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 98.1900 kg 11,500.00 1,129,185.00
Kawat Beton 1.4700 kg 18,000.00 26,460.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,603,510.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,909,410.00
Keuntungan Max. 10 % 290,941.00
Jumlah 3,200,351.00
Dibulatkan 3,200,300.00
Page 68
1 2 3 4 5 6=(3x5)
A.04.45 1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3500 m³ 1,900,000.00 665,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 18,000.00 124,740.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 151.9500 kg 11,500.00 1,747,425.00
Kawat Beton 2.2800 kg 18,000.00 41,040.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,236,330.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,542,230.00
Keuntungan Max. 10 % 354,223.00
Jumlah 3,896,453.00
Dibulatkan 3,896,400.00
A.04.45.RB.1 1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.5680 m³ 1,900,000.00 1,079,200.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 18,000.00 124,740.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 127.7223 kg 11,500.00 1,468,806.22
Kawat Beton 2.2800 kg 18,000.00 41,040.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,371,911.22
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,677,811.22
Keuntungan Max. 10 % 367,781.12
Jumlah 4,045,592.34
Dibulatkan 4,045,500.00
Page 69
1 2 3 4 5 6=(3x5)
A.04.46 1 M3 MEMBUAT RING BALK 15/25 (201,7900 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3500 m³ 1,900,000.00 665,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 18,000.00 124,740.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 201.7900 kg 11,500.00 2,320,585.00
Kawat Beton 3.03000 kg 18,000.00 54,540.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,822,990.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,128,890.00
Keuntungan Max. 10 % 412,889.00
Jumlah 4,541,779.00
Dibulatkan 4,541,700.00
A.04.47 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.8 JARAK 10 cm TEBAL 6 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 144.5500 kg 11,500.00 1,662,325.00
Kawat Beton 2.1700 kg 18,000.00 39,060.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.5100 kg 18,000.00 135,180.00
Minyak Bekisting 3.7600 ltr 3,500.00 13,160.00
Bekesting Albasiah 0.4100 m³ 1,900,000.00 779,000.00
Jumlah Bahan 3,274,705.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,930,059.67
Keuntungan Max. 10 % 393,005.97
Jumlah Total 4,323,065.64
Dibulatkan 4,323,000.00
Page 70
1 2 3 4 5 6=(3x5)
A.04.48 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 10 cm TEBAL 8 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 108.3700 kg 11,500.00 1,246,255.00
Kawat Beton 1.6300 kg 18,000.00 29,340.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.8600 kg 18,000.00 105,480.00
Minyak Bekisting 2.9300 ltr 3,500.00 10,255.00
Bekisting Albasiah 0.3200 m³ 1,900,000.00 608,000.00
Jumlah Bahan 2,645,310.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,300,664.67
Keuntungan Max. 10 % 330,066.47
Jumlah Total 3,630,731.14
Dibulatkan 3,630,700.00
A.04.48.Lp 1 M3 PEK. LISTPLANG BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 20 cm 8/50 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton u 24 80.9813 kg 11,500.00 931,284.38
Kawat Beton 1.6300 kg 18,000.00 29,340.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.8600 kg 18,000.00 105,480.00
Minyak Bekisting 2.9300 ltr 3,500.00 10,255.00
Bekisting Albasiah 0.3200 m³ 1,900,000.00 608,000.00
Jumlah Bahan 2,330,339.38
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 2,985,694.05
Keuntungan Max. 10 % 298,569.40
Jumlah Total 3,284,263.45
Dibulatkan 3,284,200.00
Page 71
1 2 3 4 5 6=(3x5)
A.04.49 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 134.4500 kg 11,500.00 1,546,175.00
Kawat Beton 2.0200 kg 18,000.00 36,360.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.8800 kg 18,000.00 87,840.00
Minyak Bekisting 2.4400 ltr 3,500.00 8,540.00
Bekisting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Jumlah Bahan 2,837,895.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,493,249.67
Keuntungan Max. 10 % 349,324.97
Jumlah Total 3,842,574.64
Dibulatkan 3,842,500.00
A.04.50 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 192.9900 kg 11,500.00 2,219,385.00
Kawat Beton 2.8900 kg 18,000.00 52,020.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.8800 kg 18,000.00 87,840.00
Minyak Bekisting 2.4400 ltr 3,500.00 8,540.00
Bekisting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Jumlah Bahan 3,526,765.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 4,182,119.67
Keuntungan Max. 10 % 418,211.97
Jumlah Total 4,600,331.64
Dibulatkan 4,600,300.00
Page 72
1 2 3 4 5 6=(3x5)
A.04.51 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 160.6100 kg 11,500.00 1,847,015.00
Kawat Beton 2.4100 kg 18,000.00 43,380.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.2300 kg 18,000.00 76,140.00
Minyak Bekisting 2.1100 ltr 3,500.00 7,385.00
Bekesting Albasiah 0.2300 m³ 1,900,000.00 437,000.00
Jumlah Bahan 3,056,900.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,712,254.67
Keuntungan Max. 10 % 371,225.47
Jumlah Total 4,083,480.14
Dibulatkan 4,083,400.00
A.04.52 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 15 cm TEBAL 12 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 243.2800 Kg 11,500.00 2,797,720.00
Kawat Beton 3.6500 Kg 18,000.00 65,700.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.2300 kg 18,000.00 76,140.00
Minyak Bekisting 2.1100 ltr 3,500.00 7,385.00
Bekesting Albasiah 0.2300 m³ 1,900,000.00 437,000.00
Jumlah Bahan 4,029,925.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 4,685,279.67
Keuntungan Max. 10 % 468,527.97
Jumlah Total 5,153,807.64
Dibulatkan 5,153,800.00
Page 73
1 2 3 4 5 6=(3x5)
An. PL 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.10 JARAK 15 cm TEBAL 12 cm
BAHAN :
Semen Portland 232.0000 kg 1,360.00 315,520.00
Pasir Beton 0.5200 lbr 135,000.00 70,200.00
Batu Pecah Mesin 1/2 & 2/3 0.7800 M3 175,000.00 136,500.00
Besi Beton Polos U 24 162.51580 Kg 11,500.00 1,868,931.72
Kawat Beton 4.9937 Kg 18,000.00 89,886.62
Kayu Terentang Albasiah, Papan 0.2450 m³ 1,900,000.00 465,500.00
Paku Biasa 2" - 5" 0.1500 kg 18,000.00 2,700.00
Minyak Bekisting 1.4000 Ltr 3,500.00 4,900.00
Kayu Balok Albasiah 0.0700 m³ 1,700,000.00 119,000.00
Jumlah Bahan 3,073,138.33
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,728,493.00
Keuntungan Max. 10 % 372,849.30
Jumlah Total 4,101,342.30
Dibulatkan 4,101,340.00
A.04.53 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 15 cm TEBAL 20 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 152.4400 kg 11,500.00 1,753,060.00
Kawat Beton 2.2300 kg 18,000.00 40,140.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 2.9600 kg 18,000.00 53,280.00
Minyak Bekisting 1.4800 ltr 3,500.00 5,180.00
Bekesting Albasiah 0.1600 m³ 1,900,000.00 304,000.00
Jumlah Bahan 2,801,640.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,456,994.67
Keuntungan Max. 10 % 345,699.47
Jumlah Total 3,802,694.14
Dibulatkan 3,802,600.00
Page 74
1 2 3 4 5 6=(3x5)
A.04.54 1 M3 PEK. Plat Beton Tulang, Tulangan 2 Lapis DIA.16-17.5 cm dan DIA. 10-12.5 cm Tebal 20 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 lbr 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 178.1600 kg 11,500.00 2,048,840.00
Kawat Beton 2.6700 kg 18,000.00 48,060.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 2.9600 kg 18,000.00 53,280.00
Minyak Bekisting 1.4800 ltr 3,500.00 5,180.00
Bekesting Albasiah 0.1600 m³ 1,900,000.00 304,000.00
Jumlah Bahan 3,105,340.00
UPAH :
Pekerja 5.1940 Oh 45,000.00 233,730.00
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 2.4420 Oh 60,000.00 146,520.00
Tukang Besi 1.2936 Oh 60,000.00 77,616.00
Kepala Tukang 0.3868 Oh 65,000.00 25,142.00
Mandor 0.1748 Oh 70,000.00 12,236.00
Jumlah Pekerja 510,244.00
Jumlah Bahan + Pekerja 3,615,584.00
Keuntungan Max. 10 % 361,558.40
Jumlah Total 3,977,142.40
Dibulatkan 3,977,100.00
A.04.55 1 M3 PEK. Plat Beton Tulang, Tulangan 2 Lapis DIA.16 - 15 CM dan DIA. 12 - 15 cm Tebal 20 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 210.5700 kg 11,500.00 2,421,555.00
Kawat Beton 3.1600 kg 18,000.00 56,880.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 2.9600 kg 18,000.00 53,280.00
Minyak Bekisting 1.4800 ltr 3,500.00 5,180.00
Bekesting Albasiah 0.1600 m³ 1,900,000.00 304,000.00
Jumlah Bahan 3,486,875.00
UPAH :
Pekerja 5.1940 Oh 45,000.00 233,730.00
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 2.4420 Oh 60,000.00 146,520.00
Tukang Besi 1.2936 Oh 60,000.00 77,616.00
Kepala Tukang 0.3868 Oh 65,000.00 25,142.00
Mandor 0.1748 Oh 70,000.00 12,236.00
Jumlah Pekerja 510,244.00
Jumlah Bahan + Pekerja 3,997,119.00
Keuntungan Max. 10 % 399,711.90
Jumlah Total 4,396,830.90
Dibulatkan 4,396,800.00
Page 75
1 2 3 4 5 6=(3x5)
A.05.01 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm 140.0000 bh 600.00 84,000.00
Semen Portland 22.2000 kg 1,360.00 30,192.00
Pasir Pasang 0.1020 m³ 120,000.00 12,240.00
Jumlah Bahan 126,432.00
UPAH :
Pekerja 0.6000 Oh 45,000.00 27,000.00
Tukang Batu 0.2000 Oh 60,000.00 12,000.00
Kepala Tukang 0.0200 Oh 65,000.00 1,300.00
Mandor 0.0300 Oh 70,000.00 2,100.00
Jumlah Pekerja 42,400.00
Jumlah Bahan + Pekerja 168,832.00
Keuntungan Max. 10 % 16,883.20
Jumlah Total 185,715.20
Dibulatkan 185,700.00
A.05.03 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm 70.0000 bh 600.00 42,000.00
Semen Portland 14.3700 kg 1,360.00 19,543.20
Pasir Pasang 0.0400 m³ 120,000.00 4,800.00
Jumlah Bahan 66,343.20
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1000 Oh 60,000.00 6,000.00
Kepala Tukang 0.0100 Oh 65,000.00 650.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 21,200.00
Jumlah Bahan + Pekerja 87,543.20
Keuntungan Max. 10 % 8,754.32
Jumlah Total 96,297.52
Dibulatkan 96,200.00
A.05.05 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm 70.0000 bh 600.00 42,000.00
Semen Portland 9.6800 kg 1,360.00 13,164.80
Pasir Pasang 0.0450 m³ 120,000.00 5,400.00
Jumlah Bahan 60,564.80
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1000 Oh 60,000.00 6,000.00
Kepala Tukang 0.0100 Oh 65,000.00 650.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 21,200.00
Jumlah Bahan + Pekerja 81,764.80
Keuntungan Max. 10 % 8,176.48
Jumlah Total 89,941.28
Dibulatkan 89,900.00
Page 76
1 2 3 4 5 6=(3x5)
A.06.02 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIAN
BAHAN :
Semen Portland 7.7760 kg 1,360.00 10,575.36
Pasir Pasang 0.0230 m³ 120,000.00 2,760.00
Jumlah Bahan 13,335.36
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1500 Oh 60,000.00 9,000.00
Kepala Tukang 0.0150 Oh 65,000.00 975.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 24,525.00
Jumlah Bahan + Pekerja 37,860.36
Keuntungan Max. 10 % 3,786.04
Jumlah Total 41,646.40
Dibulatkan 41,600.00
A.06.03 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN
BAHAN :
Semen Portland 6.2400 kg 1,360.00 8,486.40
Pasir Pasang 0.0240 m³ 120,000.00 2,880.00
Jumlah Bahan 11,366.40
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1500 Oh 60,000.00 9,000.00
Kepala Tukang 0.0150 Oh 65,000.00 975.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 24,525.00
Jumlah Bahan + Pekerja 35,891.40
Keuntungan Max. 10 % 3,589.14
Jumlah Total 39,480.54
Dibulatkan 39,400.00
A.06.04 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN
BAHAN :
Semen Portland 5.1840 kg 1,360.00 7,050.24
Pasir Pasang 0.0260 m³ 120,000.00 3,120.00
Jumlah Bahan 10,170.24
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1500 Oh 60,000.00 9,000.00
Kepala Tukang 0.0150 Oh 65,000.00 975.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 24,525.00
Jumlah Bahan + Pekerja 34,695.24
Keuntungan Max. 10 % 3,469.52
Jumlah Total 38,164.76
Dibulatkan 38,100.00
A.06.20 1 M2 ACIAN PC
BAHAN :
Semen Portland 3.2500 kg 1,360.00 4,420.00
Jumlah Bahan 4,420.00
UPAH :
Pekerja 0.2000 Oh 45,000.00 9,000.00
Tukang Batu 0.1000 Oh 60,000.00 6,000.00
Kepala Tukang 0.0100 Oh 65,000.00 650.00
Mandor 0.0100 Oh 70,000.00 700.00
Jumlah Pekerja 16,350.00
Jumlah Bahan + Pekerja 20,770.00
Keuntungan Max. 10 % 2,077.00
Jumlah 22,847.00
Dibulatkan 22,800.00
A.07.01 1 M2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : -
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR ARSIP DAN PERPUSTAKAAN DAERAH KOTA BANJAR
LOKASI : KOTA BANJAR
SUMBER DANA : -
TAHUN ANGGARAN : 2013
NO URAIAN JUMLAH
1 2 3
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN KONSTRUKSI
HARGA JUMLAH
NO URAIAN PEKERJAAN KODE SATUAN VOLUME SATUAN HARGA SATUAN
ANALISA Rp. Rp.
1 2 3 4 5 6 7
A. PEKERJAAN PERSIAPAN
1 Pekerjaan Papan Nama Kegiatan/Banner DIHITUNG LS 1.00 150,000.00 150,000.00
2 Pekerjaan Pengukuran dan Pasangan Bouwplank A.01.01 M' 84.00 50,100.00 4,208,400.00
3 Pekerjaan Esteger Bambu A. STG M2 76.00 70,690.00 5,372,440.00
4 Pekerjaan Esteger Skapolding DIHITUNG M2 360.00 45,000.00 16,200,000.00
5 Pekerjaan Pengadaan Air Kerja DIHITUNG LS 1.00 2,500,000.00 2,500,000.00
6 Pekerjaan Bongkaran Sisa Bangunan Lama DIHITUNG LS 1.00 5,000,000.00 5,000,000.00
7 Pekerjaan Pengadaan Direksikeet DIHITUNG LS 1.00 4,000,000.00 4,000,000.00
8 Pekerjaan Pembuangan dan Pembersihan Sisa Pekerjaan DIHITUNG LS 1.00 2,000,000.00 2,000,000.00
9 Mobilisasi dan Demobilisasi Bahan dan Peralatan Kerja DIHITUNG LS 1.00 5,000,000.00 5,000,000.00
10 Quality Control DIHITUNG LS 1.00 2,500,000.00 2,500,000.00
11 Pagar Pengaman Pekerjaan (Keliling Lokasi Pekerjaan) DIHITUNG LS 1.00 10,000,000.00 10,000,000.00
12 Administrasi Dokumentasi dan Pelaporan DIHITUNG LS 1.00 7,500,000.00 7,500,000.00
JUMLAH TOTAL HARGA PEKERJAAN PERSIAPAN 64,430,840.00
B. PEKERJAAN KONSTRUKSI
1 PEKERJAAN BANGUNAN LANTAI BAWAH
1.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan Galian Tanah Pondasi Batu Kali A.02.01 M3 28.46 39,000.00 1,109,940.00
2 Pekerjaan Galian Tanah Pondasi Plat Beton A.02.03 M3 220.04 57,100.00 12,564,284.00
3 Pekerjaan Urugan Tanah Kembali Bekas Galian Pondasi Batu Kali A.02.09 M3 11.38 13,000.00 147,992.00
4 Pekerjaan Urugan Tanah Kembali Bekas Galian Pondasi Plat Beton A.02.09 M3 132.02 13,000.00 1,716,312.00
5 Pekerjaan Urugan Sirtu Peninggian Lantai Bangunan A.02.13 M3 88.80 159,500.00 14,163,600.00
6 Pekerjaan Urugan Pasir Alas Pondasi Batu Kali A.02.12 M3 1.62 147,600.00 239,112.00
7 Pekerjaan Urugan Pasir Alas Pondasi Plat Beton A.02.12 M3 7.03 147,600.00 1,037,628.00
8 Pekerjaan Urugan Pasir Alas Lantai A.02.12 M3 14.80 147,600.00 2,184,480.00
JUMLAH TOTAL HARGA 1.1 PEKERJAAN GALIAN DAN URUGAN 33,163,348.00
NO URAIAN JUMLAH
1 2 3
B. PEKERJAAN KONSTRUKSI
TERBILANG : TIGA MILYAR DUA RATUS SEMBILAN PULUH TUJUH JUTA ENAM RATUS LIMA PULUH EMPAT RIBU RUPIAH
Dibuat :
RASIM
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN KAMAR TYPE DELUXE ROOM
LOKASI : PANGANDARAN
TAHUN ANGGARAN : 2013
HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6
A. PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Pasangan Bouwplank m1 122.00 50,100.00 6,112,200.00
2 Pekerjaan Esteger Bambu m2 92.00 70,690.00 6,503,480.00
3 Pekerjaan Pengadaan Air Kerja ls 1.00 3,500,000.00 3,500,000.00
4 Pekerjaan Pembuangan dan Pembersihan Sisa Pekerjaan ls 1.00 3,000,000.00 3,000,000.00
5 Pekerjaan Bongkaran ls 1.00 10,000,000.00 10,000,000.00
5 Pagar Pengaman Pekerjaan (Keliling Lokasi Pekerjaan) ls 1.00 4,500,000.00 4,500,000.00
Jumlah 33,615,680.00
B. PEKERJAAN KONSTRUKSI
1 PEKERJAAN BANGUNAN LANTAI I
1.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan Galian Tanah Pondasi Plat Beton m3 368.06 48,000.00 17,666,880.00
2 Pekerjaan Urugan Tanah Kembali Bekas Galian Pondasi Plat Beton m3 276.05 13,000.00 3,588,585.00
3 Pekerjaan Urugan Sirtu Peninggian Lantai Bangunan m3 179.60 159,500.00 28,646,200.00
4 Pekerjaan Urugan Pasir Alas Pondasi Plat Beton m3 9.20 147,600.00 1,358,141.40
5 Pekerjaan Urugan Pasir Alas Lantai m3 17.96 147,600.00 2,650,896.00
Jumlah 53,910,702.40
1 2
A. PEKERJAAN PERSIAPAN
1 Pekerjaan Papan Nama Kegiatan/Banner
2 Pekerjaan Pengukuran dan Pasangan Bouwplank
3 Pekerjaan Esteger Bambu
4 Pekerjaan Esteger Skapolding
5 Pekerjaan Pengadaan Air Kerja
6 Pekerjaan Pengadaan Direksikeet
7 Pekerjaan Pembuangan dan Pembersihan Sisa Pekerjaan
8 Mobilisasi dan Demobilisasi Bahan dan Peralatan Kerja
9 Quality Control
10 Pagar Pengaman Pekerjaan (Keliling Lokasi Pekerjaan)
11 Administrasi Dokumentasi dan Pelaporan
B. PEKERJAAN KONSTRUKSI
1 PEKERJAAN BANGUNAN LANTAI BAWAH
1.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan Galian Tanah Pondasi Batu Kali
KUDA KUDA
RANGKA ATAP
Lisplank
PANJANG LBR TINGGI JUMLAH JUMLAH VOL SAT
1.00 LS
122 122.00 M'
92.00 M2
- M2
1.00 LS
1.00 LS
1.00 LS
- LS
- LS
1.00 LS
1.00 LS
9.12 m3
276.045 m3
44.9 8.00 0.5 1 179.60 179.60 m3
2 2 0.25 28 1 28.00
1.15 1.15 0.3 28 0.39675 11.11 39.11 m3
2 2 0.25 11 1 11.00
1.15 1.15 0.3 11 0.39675 4.36 15.36 m3
1.5 1.5 0.25 0 0.5625 -
0.9 0.9 0.3 0 0.243 0.00 - m3
11.84 m2
852.63 m2
1.2 3.12 11 3.744 41.184 41.18 m2
j1 10.2 0 0
j2 6.2 0 0
p2 5.6 0 0
j5 4.2 0 0
0 m1
2 2.5 0 5 0 0 m2
0.6 2 0 1.2 0 0 m2
362.4 m2
271.80 m1
0
9
14
3
7
7
52.35 1 52.35
85.36 0 0
0 3 0
38.06 0 0
362.4 m2
9.02 0 0
6.94 0 0
0 m2
30.64 0 0
4.05 0 0
0 m2
6.36 0 0
3 0 0
0 m2
203 0.4 0.1 0 20.3 20.3 m2
893.81 m2
362.4 m2
P3 4.8 0.24 0 3 1.152 3.456
P4 5.2 0.24 0 0 1.248 0
J4 4 0.24 0 7 0.96 6.72
pintu 2 0.82 3 1.64 4.92
jrndela 3.84 0.07 7 0.2688 1.8816
16.98 m2
6
1
2
1
13
3
24
60
92
12 13.20
21 23.10
15 16.50
0
2
3
2
0
2
53
43
6
10
4
10
5
14
2
1
40.37 m2
1,988.07 m2
1.2 3.12 8 3.744 29.952 29.95 m2
107.00 m1
41 0 0
6.2 0 0
6.3 0 0
0 m1
1 2.4 0 2.4 0
0.5 2.4 0 1.2 0
0.3 1.4 10 0.42 4.2
4.20 m2
362.4 m2
543.60 m1
30
20
10
20
20
23.2 4 92.8
29.85 1 29.85
36.6 1 36.6
17.25 0 0
9 0 0
330.81 m2
3 2 9 6 54
6.94 0 0
54 m2
93.67 1 93.67
16.23 0 0
93.67 m2
9.2 2 9 18.4 165.6
18.6 0 0
165.6 m2
30 0.6 0.1 10 1.8 18
23.6 0.6 0.1 1 2.36
21.6 0.6 0.1 4 2.16
82.9 0.6 0.1 1 8.29
18.00 m2
1,988.07
362.4
P3 4.8 0.24 0 10 1.152 11.52
P4 5.2 0.24 0 0 1.248 0
J4 4 0.24 0 10 0.96 9.6
pintu 2 0.82 10 1.64 16.4
jrndela 3.84 0.07 10 0.2688 2.688
40.21 m2
6
1
9
0
80
50
0
12 0
24 80
24 80
0
9
9
9
9
9
84
11
8 9 72
1
30
9
30
9
19
18.74
#REF!
b.tarik 8.25 0.08 0.12 0.0792
kaki 9.2 0.08 0.12 0.08832
ander 2.5 0.08 0.12 0.024
skoor 6 0.08 0.12 0.0576
gapit 12.6 0.06 0.12 0.09072
sl.angin 12 0.06 0.12 0.0864
sl.gempa 12 0.06 0.12 0.0864
15 0.51264 7.69
gording 52.9 0.06 0.12 7 0.38088 2.67
10.36 m3