Anda di halaman 1dari 113

CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1 10.00 0.62


2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.19 13 14 1.21 3 16.00 1.58
4 5.7 0.20 14 16 1.58 4 19.00 2.23
5 6.0 0.22 15 19 2.23 5 22.00 2.98
6 6.5 0.31 16 22 2.98 6 25.00 3.85
7 8.0 0.40 17 23 3.26 7 29.00 5.19
8 9.0 0.53 18 25 3.85 8 32.00 6.31
9 10.0 0.62 19 28 4.83 9 36.00 7.99
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3

1. Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 cm
= ( 1 : 0.12 : 0.12 ) = 69.44 m1
Besi 4 batang dia. 12 = 4 x 69,44 x 0,89 kg = 247.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg = 66.67 kg ( B )

BERAT BESI BETON UNTUK UKURAN 12 x 12 CM1 DALAM 1 M3 = 313.89 kg/m3 ( A + B )

2. Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 15 x 15 c = ( 1 : 0.15 : 0.15 ) = 44.44 m1
Besi 4 batang dia. 12 = 4 x 44,44 x 0,89 kg = 158.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg = 71.11 kg ( B )

BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 = 229.33 kg/m3 ( A + B )

3. Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 c= ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg = 118.67 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x = 155.56 kg ( B )

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3 = 274.22 kg/m3 ( A + B )

4. Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 c = ( 1 : 0.20 : 0.30 ) = 16.67 m1
Besi 4 batang dia. 12 = 4 x 16,67 x 0,89 kg = 89.00 kg ( A)
Besi 2 batang dia. 10 = 2 x 16.67 x 0.62 kg = 0.00 kg ( B)
Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X = 33.33 kg ( C )

BERAT BESI BETON UNTUK UKURAN 20 x 30 CM DALAM 1 M3 = 122.33 kg/m3 ( A + B + C )

KOTA BANJAR Halaman : 1+114


Lampiran 1
DAFTAR BERAT BESI KANAL " C "

NO. UKURAN BESI KANAL " C " BERAT 6 M1 BERAT PER 1 M1

6.00
1 60 x 30 x 10 x 1.6 x 6 mm 9.80 kg 1.63 kg
2 60 x 30 x 10 x 2.3 x 6 mm 13.90 kg 2.32 kg
3 75 x 35 x 15 x 1.6 x 6 mm 12.50 kg 2.08 kg
4 75 x 35 x 15 x 2.3 x 6 mm 17.40 kg 2.90 kg
5 75 x 45 x 15 x 1.6 x 6 mm 14.00 kg 2.33 kg
6 75 x 45 x 15 x 2.3 x 6 mm 19.00 kg 3.17 kg
7 100 x 50 x 20 x 2 x 6 mm 21.40 kg 3.57 kg
8 100 x 50 x 20 x 2.3 x 6 mm 24.40 kg 4.07 kg
9 100 x 50 x 20 x 3.2 x 6 mm 33.00 kg 5.50 kg
10 125 x 50 x 20 x 2 x 6 mm 23.70 kg 3.95 kg
11 125 x 50 x 20 x 2.3 x 6 mm 27.10 kg 4.52 kg
12 125 x 50 x 20 x 3.2 x 6 mm 37.00 kg 6.17 kg
13 150 x 50 x 20 x 2 x 6 mm 26.10 kg 4.35 kg
14 150 x 50 x 20 x 2.3 x 6 mm 29.76 kg 4.96 kg
15 150 x 50 x 20 x 3.2 x 6 mm 40.56 kg 6.76 kg
16 150 x 65 x 20 x 2 x 6 mm 28.92 kg 4.82 kg
17 150 x 65 x 20 x 2.3 x 6 mm 33.00 kg 5.50 kg
18 150 x 65 x 20 x 3.2 x 6 mm 45.10 kg 7.52 kg
19 200 x 75 x 20 x 2 x 6 mm 35.52 kg 5.92 kg
20 200 x 75 x 20 x 2.3 x 6 mm 40.62 kg 6.77 kg
21 200 x 75 x 20 x 3.2 x 6 mm 55.62 kg 9.27 kg

KOTA BANJAR Halaman :2+115


Lampiran 2
DAFTAR BERAT BESI IWF

NO. UKURAN IWF BERAT 12 M1 BERAT PER 1 M1


1 100 x 50 x 5 x 7 mm 112.00 kg 9.33 kg
2 125 x 60 x 6 x 8 mm 158.40 kg 13.20 kg
3 148 x 100 x 6 x 9 mm 253.20 kg 21.10 kg
4 150 x 75 x 5 x 7 mm 168.00 kg 14.00 kg
5 175 x 90 x 5 x 8 mm 217.40 kg 18.12 kg
6 198 x 99 x 4.5 x 7 mm 218.40 kg 18.20 kg
7 200 x 100 x 5.5 x 8 mm 256.00 kg 21.33 kg
8 248 x 124 x 5 x 8 mm 308.40 kg 25.70 kg
9 250 x 125 x 6 x 9 mm 355.20 kg 29.60 kg
10 298 x 149 x 6 x 8 mm 384.00 kg 32.00 kg
11 300 x 150 x 6.5 x 9 mm 440.40 kg 36.70 kg
12 346 x 174 x 6 x 9 mm 497.00 kg 41.42 kg
13 350 x 175 x 7 x 11 mm 595.20 kg 49.60 kg
14 396 x 199 x 7 x 11 mm 679.20 kg 56.60 kg
15 400 x 200 x 8 x 13 mm 792.00 kg 66.00 kg
16 446 x 199 x 8 x 12 mm 794.40 kg 66.20 kg
17 450 x 200 x 9 x 14 mm 912.00 kg 76.00 kg
18 500 x 200 x 10 x 16 mm 1,075.00 kg 89.58 kg
19 588 x 300 x 12 x 20 mm 1,812.00 kg 151.00 kg
20 600 x 200 x 11 x 17 mm 1,272.00 kg 106.00 kg
21 700 x 300 x 13 x 24 mm 2,220.00 kg 185.00 kg
22 800 x 300 x 14 x 26 mm 2,520.00 kg 210.00 kg
23 900 x 300 x 16 x 28 mm 2,916.00 kg 243.00 kg

DAFTAR BERAT BESI SIKU " L "

NO. UKURAN BESI KANAL " L " BERAT / BATANG BERAT PER 1 M1
1 25 x 25 x 3 x 6 mm 6.72 kg 1.12 kg
2 30 x 30 x 3 x 6 mm 8.16 kg 1.36 kg
3 40 x 40 x 3 x 6 mm 11.00 kg 1.83 kg
4 40 x 40 x 4 x 6 mm 14.50 kg 2.42 kg
5 50 x 50 x 4 x 6 mm 18.50 kg 3.08 kg
6 50 x 50 x 5 x 6 mm 22.60 kg 3.77 kg
7 60 x 60 x 5 x 6 mm 27.30 kg 4.55 kg
8 60 x 60 x 6 x 6 mm 32.52 kg 5.42 kg
9 65 x 65 x 6 x 6 mm 35.46 kg 5.91 kg
10 70 x 70 x 7 x 6 mm 44.28 kg 7.38 kg
11 75 x 75 x 6 x 6 mm 41.22 kg 6.87 kg
12 75 x 75 x 8 x 6 mm 54.18 kg 9.03 kg
13 80 x 80 x 8 x 6 mm 57.96 kg 9.66 kg
14 90 x 90 x 9 x 6 mm 73.20 kg 12.20 kg
15 100 x 100 x 8 x 6 mm 73.20 kg 12.20 kg
16 100 x 100 x 10 x 6 mm 90.60 kg 15.10 kg
17 120 x 120 x 10 x 12 mm 218.40 kg 36.40 kg
18 120 x 120 x 12 x 12 mm 260.00 kg 43.33 kg
19 125 x 125 x 12 x 12 mm 280.00 kg 46.67 kg
20 130 x 130 x 9 x 12 mm 214.20 kg 35.70 kg
21 130 x 130 x 12 x 12 mm 280.00 kg 46.67 kg

KOTA BANJAR Halaman : 3+116


CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1 10.00 0.62


2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.19 13 14 1.21 3 16.00 1.58
4 5.7 0.20 14 16 1.58 4 19.00 2.23
5 6.0 0.22 15 19 2.23 5 22.00 2.98
6 6.5 0.31 16 22 2.98 6 25.00 3.85
7 8.0 0.40 17 23 3.26 7 29.00 5.19
8 9.0 0.53 18 25 3.85 8 32.00 6.31
9 10.0 0.62 19 28 4.83 9 36.00 7.99
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3


VRS I SLOOF
uraian Rms tul 4 Btg ¢ 12 + 2 Btag ¢ 10 Beugel ¢ 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.25 0.30 = 13.3333
Besi 4 batang dia. 12 4 13.3333 0.62 = 33.0667
Besi 2 batang dia. 10 0 13.3333333333 0.89 = -
Besi beugel dia. 8 jarak 10 - 20 cm 66.6666666667 1.1000 0.22 = 16.1333
49.2000

VRS II KOLOM TULANGAN 4 BUAH


uraian Rms tul 4 Btg ¢ 12 + 2 Btag ¢ 10 Beugel ¢ 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.15 0.20 = 33.3333
Besi 4 batang dia. 12 4 33.3333333333 0.62 = 82.6667
Besi 2 batang dia. 10 0 33.3333333333 0.00 = -
Besi beugel dia. 8 jarak 15 cm 222.2222222222 0.7000 0.22 = 34.2222
116.8889

VRS III KOLOM TULANGAN 6-8-12 BUAH


uraian Rms tul 4 Btg ¢ 12 + 2 Btag ¢ 10 Beugel ¢ 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.10 0.15 = 66.6667
Besi 4 batang dia. 12 4 66.6666666667 0.00 = -
Besi 2 batang dia. 10 0 66.6666666667 0.00 = -
Besi beugel dia. 8 jarak 15 cm 444.4444444444 0.5000 0.00 = -
-

VRS IV RING BALK


uraian Rms tul 4 Btg ¢ 12 + 2 Btag ¢ 10 Beugel ¢ 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.15 0.25 = 26.6667
Besi 4 batang dia. 12 6 26.6666666667 0.89 = 142.4000
Besi 2 batang dia. 10 0 26.6666666667 0.00 = -
Besi beugel dia. 8 jarak 15 cm 177.7777777778 0.8000 0.40 = 56.8889
199.2889

PLAT BETON
VOLUME LEBAR TEBAL PANJANG
1.00 1.00 0.12 8.33

JARAK TULANGAN jumlah tulangan(m') melint jumlah tulangan(m') memanja diameter volume tulangan (kg)
1 LAPIS 0.10 11.00 11.00 84.33 84.00 0.62 108.91
2 LAPIS 0.10 11.00 11.00 84.33 84.00 0.62 231.96

KOTA BANJAR Halaman : 4+114


BEKISTING SLOOF M2 M3 PAKU/m2 kg
0.300 0.300 0.600 8.800 0.18 0.396 0.300 8.800 2.64

KG PELUMAS BEKISTING ltr


KAWAT BETON 51.660 0.015 0.77 0.100 8.000 0.80
51.7

BEKISTING KOLOM M2 M3 PAKU/m2 kg


0.300 0.400 0.700 25.667 0.51 1.027 0.400 25.667 10.27

KG PELUMAS BEKISTING ltr


KAWAT BETON 116.889 0.015 1.75 0.200 25.667 5.13
122.7

BEKISTING KOLOM M2 M3 PAKU/m2 kg


0.200 0.300 0.500 36.667 0.73 1.467 0.400 36.667 14.67

KG PELUMAS BEKISTING ltr


KAWAT BETON - 0.015 - 0.200 36.667 7.33
-

BEKISTING RING BALK M2 M3 PAKU/m2 kg


0.150 0.500 0.650 19.067 0.38 0.763 0.400 19.067 7.63

KG PELUMAS BEKISTIN ltr


KAWAT BETON 209.253 0.015 3.14 0.200 19.067 3.81
209.3

untuk 1 lapis untuk 2 lapis


bekisting papan stootwerk jumlah total bekisting papan stootwerk
dikalikan koef 1.05 luas tebal
kaso 6/6 per m2 p = 3 m = 5 luas kaso
tebal 6/6 per m2 p = 3 m = 5
114.4 114.36 11.631 0.020 0.054 0.29 11.631 0.020 0.054
243.6 243.56
paku/m2 jumlah paku/m2
koefisien kawat untuk 100 kg 0.15 0.400 11.631 4.65 0.400 11.631
kawat beton jumlah kawat beton

KOTA BANJAR Halaman : 5+114


DAFTAR SATUAN UPAH PEKERJA

HARGA UPAH
NO JENIS PEKERJA BANGUNAN ( Rp. ) SATUAN WAKTU

1 PEKERJA 45,000 1 ORANG/ HR/ 8 JAM


2 PEKERJA TERAMPIL 50,000 1 ORANG/ HR/ 8 JAM
3 TUKANG GALI 45,000 1 ORANG/ HR/ 8 JAM
4 TUKANG BATU TERAMPIL 60,000 1 ORANG/ HR/ 8 JAM
5 KEPALA TUKANG BATU 65,000 1 ORANG/ HR/ 8 JAM
6 TUKANG KAYU TERAMPIL 60,000 1 ORANG/ HR/ 8 JAM
7 KEPALA TUKANG KAYU 65,000 1 ORANG/ HR/ 8 JAM
8 TUKANG CAT / PELITUR TERAMPIL 60,000 1 ORANG/ HR/ 8 JAM
9 KEPALA TUKANG CAT / PELITUR 65,000 1 ORANG/ HR/ 8 JAM
10 TUKANG BESI BETON TERAMPIL 60,000 1 ORANG/ HR/ 8 JAM
11 KEPALA TUKANG BESI BETON 65,000 1 ORANG/ HR/ 8 JAM
12 TUKANG BESI PROFIL TERAMPIL 60,000 1 ORANG/ HR/ 8 JAM
13 KEPALA TUKANG BESI PROFIL 65,000 1 ORANG/ HR/ 8 JAM
14 MANDOR 70,000 1 ORANG/ HR/ 8 JAM

Dibuat :

HERYANTO
Page 7

DAFTAR SATUAN HARGA BAHAN

Harga Satuan
NO JENIS BAHAN BANGUNAN SAT
Rp.
1 2 3 4

A AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


Pasir Urug m³ 100,000.00
Sirtu m³ 110,000.00
Pasir Pasang Kali m³ 120,000.00
Pasir Beton m³ 135,000.00
Abu Batu / Screen m³ 105,000.00
Batu Gosok ( Apung ) kg 14,000.00
Screen m³ 130,000.00
Batu belah 15-20 m³ 110,000.00
Kerikil Sungai Ayak Tanpa Pasir m³ 100,000.00
Batu Pecah Mesin 1/2 m³ 200,000.00
Batu Pecah Mesin 2/3 m³ 175,000.00
Batu Pecah Mesin 3/5 m³ 150,000.00
Batu Pecah Mesin 5/7 m³ 140,000.00
Batu Belah 10 - 15 cm m³ 115,000.00
Batu Belah 7 - 10 cm m³ 125,000.00
Batu Bronjol ( Untuk Bronjong ) m³ 110,000.00
Batu Tempel Hitam m² 160,000.00
Batu Pinggir Beton 10 x 20 x 35 bh 17,000.00
Batu Pinggir Beton 15 x 35 x 50 ( K -225 ) bh 42,000.00
Batu Telor m³ 140,000.00
Batako kecil 8 x 10 x 20 bh 1,300.00
Batako Besar 8 x 20 x 30 bh 4,000.00
Con Blok 8 x 20 x 40 (Holowblock) bh 3,000.00
Bata Merah Bakar Kelas I bh 750.00
Bata Merah Bakar Kelas II bh 600.00
Bata Merah Oven bh 2,500.00
Roster Beton 20 x 20 bh 4,000.00
Roster Beton 30 x 30 bh 7,000.00
Grass Blok 20 x 20 bh 20,000.00
Grass Blok 30 x 30 bh 25,000.00
Paving Blok Natural bh 1,300.00
Paving Blok Warna bh 1,500.00
Paving Blok Natural 6 cm m² 38,000.00
Paving Blok Warna 6 cm m² 42,500.00
Paving Blok Natural 8 cm m² 45,000.00
Paving Blok Warna 8 cm m² 50,000.00
a. Bentuk Hexagonal (1m = 27 bh)
2
bh 1,300.00
b. Bentuk Tiga Berlian (1m2 = 50 bh) bh 1,200.00
c. Bentuk Segi Panjang (1m2 = 50 bh) bh 1,200.00
Paving Blok Biasa bh 1,200.00
Page 8

1 2 3 4
Kanstin Paving Blok bh 45,000.00
Semen PC / 50 kg *M080 zak 68,000.00
Semen PC Kg 1,360.00
Semen Putih zak 90,000.00
Kanstin Jalan ukuran Besar ( bina Marga ) 1 bh = 50 cm bh 37,000.00
Kanstin Jalan ukuran 1 bh = 50 cm, tinggi 20 cm bh 22,500.00
Kanstin Jalan ukuran Besar ( bina Marga K - 300 ) 1 bh = 50 cm bh 50,000.00
Readymix Beton K 350, tanpa pompa ( selang ) 1,000,000.00
Readymix Beton K 300, tanpa pompa ( selang ) m³ 975,000.00
Readymix Beton K 225, tanpa pompa ( selang ) m³ 950,000.00
Readymix Beton K 175, tanpa pompa ( selang ) m³ 900,000.00
Kapur Pasang/ kapur tembok m³ 60,000.00
Kapur Sirih kg 1,500.00
Semen Warna kg 6,000.00
Tanah Liat m³ 37,000.00
Tanah Urug (dilokasi) m³ 25,000.00
Rumput m² 45,000.00
Hollow Block 20 bh 3,000.00
Hollow Block 15 bh 2,400.00
Hollow Block 10 bh 1,900.00
Roster Terawang Keramik bh 30,000.00
Batu Candi m2 95,000.00
Batu Sikat 0,5 / 2 cm m2 100,000.00
Neut Kusen bh 3,500.00

B BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
Plamir Tembok kg 14,000.00
Cat Tembok ICI Eksterior ( BETON ) kg 40,000.00
Cat Tembok Kelas II kg 10,000.00
Cat Tembok ICI Interior ( PLAFOND DAN DINDING ) lt 30,000.00
Cat Tembok Vinilex kg 15,000.00
Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt 95,000.00
Cat Tembok Sanlex kg 11,000.00
Cat Genteng kg 25,000.00
Cat Tahan Asam kg 50,000.00
Cat Berkilat/Cat kayu kg 55,000.00
Coating Batu kg 62,000.00
Plamir Kayu kg 15,000.00
Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) lt 50,000.00
Water Profing Emulsion kg 95,000.00
Water Profing Membrance ml 80,000.00
Rool Cat Tembok bh 22,000.00
Kape Tembok bh 9,000.00
Kape Kayu bh 7,000.00
Soligneum 1 blek 5 lt 63,000.00
Plincote kg 30,000.00
Page 9

1 2 3 4
Pengawetan Kayu m³ 45,000.00
Pengopenan Kayu m³ 650,000.00
Kwas 3" bh 10,000.00
Kwas 2' bh 7,000.00
Oker kg 40,000.00
Oyan bks 4,500.00
Oten (Pewarna Plitur ) bks 4,500.00
Spirtus lt 11,000.00
Bahan Plitur Kripik ( Sirlak India ) kg 24,000.00
Dempul Lilin kg 23,000.00
Dempul Plitur kg 3,500.00
Dempul Halus / Imfra ( Wood Filler ) kg 45,000.00
Wood Stain kg 60,000.00
Melamik Hardener kg 60,000.00
Melamik Clear Dop/Gloss kg 45,000.00
Terpentin lt 9,000.00
Tiner A lt 16,000.00
Tiner B lt 25,000.00
Kumpon kg 24,000.00
Melamik kg 45,000.00
Impra kg 40,000.00
Dempul Plastik kg 35,000.00
Dempul Duco kg 36,000.00
Ampelas lbr 2,500.00
Dempul Kayu Cap Kucing kg 28,000.00
Meni Kayu / Besi kg 22,000.00
Meni Sincromat kg 25,000.00
Cat Kayu Sieve kg 65,000.00
Cat Besi Sieve kg 65,000.00
Cat Besi Duco Danaglos/ICI kg 75,000.00
Cat Bron kg 65,000.00
Sirlak kg 70,000.00
Lem Fox bh 16,000.00
Page 10

1 2 3 4

C BAHAN KAYU BERIKUT BAHAN JADINYA


Bambu Biasa bt 7,000.00
Bambu Ø 7 s.d 10 Panjang 4 m' bt 4,000.00
Bambu Ø 5 s.d 7 bt 9,000.00
Bambu Ø 7 s.d 10 bt 10,000.00
Bambu Gombong bt 33,000.00
Rucuk Bambu bt 3,500.00
Kayu untuk Perancah m³ 1,750,000.00
Kayu untuk Kontruksi Jembatan m³
Kayu Kamper Singkil / Kapur (K. Samarinda Klas II) m³ 8,000,000.00
Kayu Balok Lokal Kelas II m³ 2,200,000.00
Kayu Papan Lokal Kelas II m³ 2,350,000.00
Kayu Lokal Kelas II Bahan Meubelair ( sejenis tisuk ) m³ 1,500,000.00
Kayu Balok Kamper m³ 7,500,000.00
Kayu Papan Kamper m³ 8,000,000.00
Kayu Balok Borneo Super m³ 4,500,000.00
Kayu Papan Borneo Super m³ 5,000,000.00
Kayu Balok Kruing m³ 4,000,000.00
Kayu Balok Kamper Medan m³ 6,000,000.00
Kayu Papan Kamper Medan m³ 6,500,000.00
Kayu Balok Kamper Banjar m³ 6,500,000.00
Kayu Papan Kamper Banjar m³ 7,000,000.00
Kayu Balok Kamper Samarinda m³ 7,500,000.00
Kayu Papan Kamper Samarinda m³ 8,000,000.00
Kayu Balok Rasamala m³ 4,800,000.00
Kayu Balok jati m³ 10,000,000.00
Kayu Papan Jati m³ 10,500,000.00
Kayu Jati Jatim Tua dia. 40 cm m³ 12,000,000.00
Kayu Jati Jateng Tua dia. 40 cm m³ 12,500,000.00
Kayu Jati Jabar Tua dia. 40 cm m³ 6,500,000.00
Kayu Jati Jabar dia. 40 cm kebawah m³ 7,000,000.00
Kayu Hutan Kelas I ( Segeng, Mahoni, Laban ) m³ 3,000,000.00
Kayu Balok Albasiah m³ 1,700,000.00
Kayu Papan Albasia m³ 1,900,000.00
Kayu Kruing m³ 3,500,000.00
Kayu Papan Borneo m³ 4,500,000.00
Dolken 8 s/d 10 uk.4m' bt 75,000.00
Dolken 7 s/d 10 bt 75,000.00
List profil kamper 1 cm m1 3,000.00
List profil kamper 2 cm m1 3,500.00
List profil kamper 4 cm m1 4,000.00
List profil kamper 5 cm m1 6,000.00
List profil kamper 10 cm m1 36,000.00
Pegangan Tangga profil Jati m1 300,000.00
Pegangan Tangga profil Kamper m1 130,000.00
Kayu Reng 2/3 Borneo m1 1,800.00
Kayu Reng 2/3 Kamper Banjar m1 3,000.00
Kayu Reng 3/4 Kamper Banjar m1 4,800.00
Reng Kayu Kls II m1 1,400.00
Page 11

1 2 3 4
List profil Kayu Lokal KLs II 4 cm m1 3,000.00
Page 12

1 2 3 4

D BAHAN PENUTUP RANGKA PLAFOND


Bahan plafond Enternit 4 mm m² 10,000.00
Bahan plafond hardpleks 5 mm 120 x 240 lbr 120,000.00
Bahan plafond Asbes Semen 5 mm m² 9,000.00
Gypsum 120 x 240 t = 9 mm ex DN lbr 70,000.00
Gypsum 120 x 240 t = 9 mm ex Luar lbr 85,000.00
Acustik Amstrong 60 x 120 lbr 130,000.00
GRC 120 x 240 lbr 55,000.00
Lis Gypsum lbr 15,000.00

E BAHAN KAYU LAPIS


Triplek 3 mm 120 x 240 lbr 50,000.00
Triplek 4 mm 120 x 240 lbr 60,000.00
Triplek 4 mm Ukuran Pintu lbr 40,000.00
Triplek 6 mm 120 x 240 lbr 90,000.00
Jabar Wood 4 mm lbr 75,000.00
Plywood 18 mm 120 x 240 lbr 290,000.00
Plywood 4 mm 120 x 240 lbr 120,000.00
Plywood 3 mm 120 x 240 lbr 72,000.00
Plywood 3 mm ukuran Pintu lbr 65,000.00
Plywood 4 mm ukuran Pintu lbr 80,000.00
Bilik Bambu ( tanpa kulit ) m² 6,000.00
Bilik Bambu ( dengan kulit ) m² 14,000.00
Bilik Bambu Hitam Variasi m² 20,000.00
Wall Paper ( kls menengah ) m² 50,000.00
Multiplek 9 mm 120 x 240 lbr 120,000.00
Multiplek 12 mm 120 x 240 lbr 160,000.00
Multiplek 18 mm 120 x 240 lbr 230,000.00
Teak Wood 3 mm 120 x 240 lbr 120,000.00
Teak Wood 4 mm 120 x 240 lbr 135,000.00
Teak Wood 3 mm 120 x 240 Ukuran Pintu lbr 80,000.00
Teak Wood ukuran Pintu 4 mm lbr 100,000.00
Tacon ( tahan bakar ) m² 125,000.00
Supercon m² 65,000.00
Melamin 4 mm 120 x 240 lbr 150,000.00
Melamin TIK 4 mm lbr 220,000.00
Formika 120 x 240 lbr 200,000.00
Formika Ukuran Pintu lbr 130,000.00
Page 13

1 2 3 4
F BAHAN LANTAI DAN PELAPIS DINDING
Tegel PC 20 x 20 bh 2,000.00
Plin Tegel PC 10 x 20 bh 1,500.00
Tegel PC 30 x 30 bh 4,000.00
Plin Tegel PC 15 x 30 bh 2,500.00
Tegel Warna 20 x 20 bh 2,500.00
Plin Tegel Warna 10 x 20 bh 2,000.00
Tegel Warna 30 x 30 bh 4,500.00
Plin Tegel Warna 15 x 30 bh 3,000.00
Tegel Badak PC 30 x 30 bh 4,000.00
Poslin 11 x 11 Warna Standar DN m² 50,000.00
Poslin 11 x 11 Warna Khusus DN m² 55,000.00
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos m² 45,000.00
Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip m² 50,000.00
Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip m² 50,000.00
Keramik 20 x 20 (KM) KWI DN Putih Polos m² 45,000.00
Keramik 20 x 25 Dinding KM KWI DN Corak m² 50,000.00
Keramik 20 x 60 Dinding KM KWI DN Corak m² 70,000.00
Keramik 30 x 30 KW I DN putih polos m² 45,000.00
Keramik 30 x 30 KW I DN Warna/Corak / Anti Slip m² 55,000.00
Granito Tile Esenssza 40 x 40 polis m² 400,000.00
Granito Tile Esenssza 40 x 40 un polis m² 300,000.00
Granito Tile Esenssza 60 x 60 polis m² 450,000.00
Granito Tile Esenssza 60 x 60 un polis m² 350,000.00
Keramik 40 x 40 cm dus 65,000.00
Keramik 60 x 60 cm dus 80,000.00
Keramik Mozaik 30 x 30 cm dus 75,000.00
Vinyl Lantai standar m² 30,000.00
Stairnosing keramik 10/20 bh 10,000.00
Stairnosing fiber m' 24,000.00
Taraso Kerang 30 x 30 m² 35,000.00
Plin Taraso 10 x 30 bh 7,000.00
Granit Alam LN Ukuran Besar m² 2,200,000.00
Granit Alam LN Ukuran Kecil m² 1,700,000.00
Granit Alam DN Ukuran Besar m² 1,500,000.00
Granit Alam DN Ukuran Kecil m² 1,300,000.00
Marmer Alam Lampung Ukuran Besar m² 250,000.00
Marmer Alam Lampung Ukuran Kecil m² 180,000.00
Marmer Alam Citatah Ukuran Besar m² 600,000.00
Marmer Alam Citatah Ukuran Kecil m² 400,000.00
Marmer Sintetis m² 350,000.00
Bata Karawang bh 6,500.00
Campuran untuk Kedap Air (AM) ltr 35,000.00
Lantai Parket m² 450,000.00
Stepnozing m' 17,000.00
Plint Keramik 5/25 bh 12,000.00
Keramik Lantai Antislip sekualitas Romance KW I Warna 33x33 cm m2 75,000.00
Keramik Lantai sekualitas Romance KW I Warna 33x33 cm m2 70,000.00
Page 14

1 2 3 4

G BAHAN SALURAN AIR KOTOR / BERSIH


Grafel 1/2 d.20 cm m1 21,000.00
Grafel 1/2 d.30 cm m1 28,000.00
Grafel 1/2 d.40 cm m1 50,000.00
Buis Beton Ø 20 cm ( 1 m' ) m1 40,000.00
Buis Beton Ø 30 cm ( 1 m' ) bh 55,000.00
Buis Beton Ø 40 cm ( 1 m' ) bh 75,000.00
Buis Beton Ø 50 cm ( 1 m' ) bh 115,000.00
Buis Beton Ø 60 cm ( 1 m' ) *M031 bh 150,000.00
Buis Beton Ø 100 cm ( 0.50 m ) *M035 bh 200,000.00
Buis Beton Ø 80 cm ( 0.50 m ) *M033 bh 135,000.00
Buis Tanah Ø 10 cm ( 0.50 m ) bh 12,000.00
Buis Tanah Ø 15 cm ( 0.50 m ) bh 14,000.00
Buis Tanah Ø 20 cm ( 0.50 m ) bh 20,000.00
Buis Tanah Ø 25 cm ( 0.50 m ) bh 22,000.00
Injuk kg 17,500.00
Tali Ijuk kg 35,000.00

H BAHAN LOGAM DAN BAHAN JADINYA


Besi Beton U-24 Rata - Rata *M167' < ¢ 22 mm kg 11,500.00
Besi Beton U-24 Rata - Rata *M167' > ¢ 22 mm kg 11,500.00
Besi Beton U-39 / U-32 Rata - Rata *M167 kg 11,500.00
Besi Hollow 2 x 4 Rk. Plafond Zincromate m' 8,000.00
Besi Hollow 2 x 2 Rk. Plafond Zincromate m' 6,000.00
Rangka Atap Baja Ringan m2 140,000.00
Pagar BRC (60 x 240 cm) bh 90,000.00
Pagar BRC (90 x 240 cm) bh 120,000.00
Bondek m² 150,000.00
Ongkos Galfanis Besi kg 7,000.00
Kawat Duri m1 2,400.00
Kawat Pengikat m1 21,000.00
Kawat Tembaga kg 6,000.00
Baja Siku / Profil DN kg 13,000.00
Baja IWF DN SII kg 14,000.00
Baja IWF Jepang kg 15,000.00
Kawat Beton *M168 kg 18,000.00
Kawat Bronjong 4 mm *M162 kg 13,000.00
Besi Galvanisir * M164 kg 38,000.00
Baja Tralis *M161 kg 17,000.00
Ram Nyamuk Hijau m² 12,000.00
Ram Kawat 1 x 1 cm m² 12,000.00
Ram Ayam m² 15,000.00
Kawat Kasa 1 x 1 cm ( Putih ) m² 13,500.00
Kawat Harmonika 4 cm m² 25,000.00
Kawat Harmonika 2 cm m² 30,000.00
Kawat Las Listrik kg 30,000.00
Wiremesh M8 m² 50,000.00
Wiremesh M6 m² 40,000.00
Plat Srip Ø 2 x 30 mm ( 6 m1) bt 40,000.00
Page 15

1 2 3 4
Plat Srip Ø 3 x 30 mm ( 6 m1) bt 75,000.00
Plat Alumunium 0.1 mm m² 50,000.00
Plat Alumunium 0.2 mm m² 85,000.00
Plat Alumunium 0.3 mm m² 120,000.00
Plat Alumunium 0.4 mm m² 135,000.00
Plat Alumunium 0.5 mm m² 160,000.00
Plat Alumunium 0.6 mm m² 180,000.00
Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " ) m1 170,000.00
Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " ) m1 190,000.00
Kusen Alumunium 4" CA (terpasang) m1 85,000.00
Kusen Alumunium Warna 4" CA (terpasang) m1 105,000.00
Handle Alumunium ( Tarikan Pintu Alumunium ) bh 95,000.00
Hurup Stainless cm 8,000.00
Kait Angin alumunium ps 95,000.00
Karet Asisoris Kusen / Pintu Alumunium m1 4,000.00
Seng Plat BJLS dia. 60 cm ( 100 m1 ) m1 28,000.00
Seng Plat BJLS dia. 90 cm ( 100 m1 ) m1 35,000.00
Plat Besi Tipis 1 mm kg 13,000.00
Plat Besi Tipis 0.5 mm kg 13,000.00
Plat Besi 2 mm s/d 5 mm kg 13,000.00
Plat Besi 6 mm s/d 10 mm kg 13,000.00
Plat Besi 10 mm Ke atas kg 13,000.00
Lem Kuning (aibond) kg 50,000.00
Lem Fox kg 15,000.00
Rolling door Besi m2 550,000.00
Pintu Aluminium m2 210,000.00
Pintu Swing 5 mm unt 1,100,000.00
Pintu Swing 8 mm unt 1,800,000.00
Teralis Besi strip m2 125,000.00
Besi Teralis m2 550,000.00
Pintu kaca Frameless (Lengkap kunci dan Floorhings) ps 8,500,000.00
Daun Pintu Kaca Aluminium Warna B 80 unt 1,500,000.00
Daun Pintu Kaca Aluminium Warna B 70 unt 1,400,000.00
Daun Pintu Kaca Aluminium Warna B 45 unt 1,200,000.00
Daun Pintu KM/WC Aluminium Warna B.60 unt 1,100,000.00
Daun Jendela Aluminium Warna (casement) 1X0.55 unt 500,000.00
Daun Jendela Aluminium Warna (casement) 0.25 X1.15 unt 400,000.00
Daun Jendela Aluminium Warna (casement) 65 X115 unt 500,000.00
Handrill Stainless 2 " m' 275,000.00
Page 16

1 2 3 4
I BAHAN KACA
Kaca Polos 2 mm m² 45,000.00
Kaca Polos 3 mm m² 50,000.00
Kaca Es 5 mm m² 70,000.00
Kaca Polos 5 mm m² 60,000.00
Kaca Polos Tebal 8 mm m² 180,000.00
Kaca Polos Tebal 12 mm m² 250,000.00
Kaca Rayband 5 mm ( ASAHI ) m² 65,000.00
Kaca Rayband 8 mm ( ASAHI ) m² 600,000.00
Kaca Rayband 12 mm ( ASAHI ) m² 900,000.00
Kaca Patri Lokal Terpasang ( ASAHI ) m² 365,000.00
Kaca Patri EX Luar negeri terpasang m² 1,500,000.00
Glass Block DN 20 x 20 bh 25,000.00
Glass Block 20 x 20 Ex LN bh 80,000.00

J BAHAN PAKU DAN MUR BAUT


Paku 3 cm kg 18,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk kg 18,000.00
Paku 8 cm s/d 12 cm kg 18,000.00
Paku 2 cm s/d 4 cm /Paku Tripleks - Bilik kg 18,000.00
Paku 1/2 cm s/d 1 cm /Paku seng-Plat Poil kg 18,000.00
Paku Beton 2 cm s/d 5 cm kg 24,000.00
Paku Kait Lengkap bh 1,000.00
Paku Cacing kg 18,000.00
Paku Seng Glb. / Paku Asbes Glb. kg 20,000.00
Paku Skrup kg 9,000.00
Besi Beugel kuda - kuda kg 14,000.00
Duk Angker kg 14,000.00
Angker Mur Baut dia.19 / panjang 60 cm bh 18,000.00
Mur Baut HTB dia. 19 s/d 16 (5 cm) bh 6,000.00
Mur Baut Biasa dia.19 s/d 16 (5 cm) bh 4,000.00
Piser dia. 12 s/d 20 cm bh 3,000.00

K BAHAN PERPIPAAN
Besi Pipa untuk Hydrant BSP Ø 1" bt 100,000.00
Besi Pipa untuk Hydrant BSP Ø 1,25" bt 115,000.00
Besi Pipa untuk Hydrant BSP Ø 1,5" bt 130,000.00
Besi Pipa untuk Hydrant BSP Ø 2" bt 150,000.00
Besi Pipa untuk Hydrant BSP Ø 2,5" bt 440,000.00
Besi Pipa untuk Hydrant BSP Ø 3" bt 600,000.00
Besi Pipa untuk Hydrant BSP Ø 4" bt 850,000.00
Besi Pipa untuk Hydrant BSP Ø 6" bt 1,500,000.00
Hydrant bh 270,000.00
Besi Pipa Hitam Ø 1" t=2 mm bt 90,000.00
Besi Pipa Hitam Ø 2" t=2 mm bt 180,000.00
Besi Pipa Hitam Ø 3" t=2 mm bt 320,000.00
Besi Pipa Hitam Ø 4" t=2 mm bt 400,000.00
Besi Pipa Hitam Ø 6" t=2 mm bt 550,000.00
Page 17

1 2 3 4
Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bt 90,000.00
Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt 105,000.00
Pipa GIP Medium A Ø 1" ( 6 m1 ) bt 160,000.00
Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt 200,000.00
Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt 240,000.00
Pipa GIP Medium A Ø 1 3/4"( 6 m1 ) bt 300,000.00
Pipa GIP Medium A Ø 2" ( 6 m1 ) bt 360,000.00
Pipa GIP Medium A Ø 2 1/2" ( 6 m1 ) bt 500,000.00
Pipa GIP Medium A Ø 3" ( 6 m1 ) bt 600,000.00
Pipa GIP Medium A Ø 4" ( 6 m1 ) bt 800,000.00
Macam2 Sambungan GIP Ø 1/2" bh 4,000.00
Macam2 Sambungan GIP Ø 3/4" bh 7,000.00
Macam2 Sambungan GIP Ø 1" bh 10,000.00
Macam2 Sambungan GIP Ø 1 1/4" bh 13,000.00
Macam2 Sambungan GIP Ø 1 1/2" bh 14,000.00
Macam2 Sambungan GIP Ø 1 3/4" bh 22,000.00
Macam2 Sambungan GIP Ø 2" bh 30,000.00
Macam2 Sambungan GIP Ø 2 1/2" bh 42,000.00
Macam2 Sambungan GIP Ø 3" bh 55,000.00
Macam2 Sambungan GIP Ø 4" bh 60,000.00
Pipa PVC RUCIKA type AW Ø 1/2" bt 25,000.00
Pipa PVC RUCIKA type AW Ø 3/4" bt 38,000.00
Pipa PVC RUCIKA type AW Ø 1" bt 48,000.00
Pipa PVC RUCIKA type AW Ø 1 1/4" bt 65,000.00
Pipa PVC RUCIKA type AW Ø 1 1/2" bt 85,000.00
Pipa PVC RUCIKA type AW Ø 2" bt 135,000.00
Pipa PVC RUCIKA type AW Ø 2 1/2" bt 160,000.00
Pipa PVC RUCIKA type AW Ø 3" bt 250,000.00
Pipa PVC RUCIKA type AW Ø 4" bt 350,000.00
Pipa PVC RUCIKA type AW Ø 6" bt 700,000.00
Pipa PVC RUCIKA type AW Ø 8" bt 1,000,000.00
Pipa PVC MASPION ABU Ø 1/2" (AW) bt 16,000.00
Pipa PVC MASPION ABU Ø 3/4" (AW) bt 22,000.00
Pipa PVC MASPION ABU Ø 1" (AW) bt 27,000.00
Pipa PVC MASPION ABU Ø 1 1/4" (AW) bt 38,000.00
Pipa PVC MASPION ABU Ø 1 1/2" (AW) bt 48,000.00
Pipa PVC MASPION ABU Ø 2" (AW) bt 85,000.00
Pipa PVC MASPION ABU Ø 2 1/2" (AW) bt 105,000.00
Pipa PVC MASPION ABU Ø 3" (AW) bt 160,000.00
Pipa PVC MASPION ABU Ø 4" (AW) bt 200,000.00
Pipa PVC MASPION ABU Ø 6" (AW) bt 620,000.00
Pipa GI Diameter 0,5" bt 45,000.00
Pipa GI Diameter 0,75" bt 60,000.00
Pipa GI Diameter 1" bt 70,000.00
Pipa GI Diameter 1,25" bt 105,000.00
Pipa GI Diameter 1,5" bt 125,000.00
Pipa GI Diameter 2" bt 150,000.00
Pipa GI Diameter 2,5" bt 250,000.00
Pipa GI Diameter 3" bt 350,000.00
Page 18

1 2 3 4
Pipa GI Diameter 4" bt 400,000.00
Knie PVC Diameter 0,5" bh 2,000.00
Knie PVC Diameter 0,75" bh 2,000.00
Knie PVC Diameter 1" bh 4,000.00
Knie PVC Diameter 2" bh 15,000.00
Knie PVC Diameter 3" bh 20,000.00
Knie PVC Diameter 4" bh 55,000.00
Tee PVC Diameter 0,5" bh 2,000.00
Tee PVC Diameter 0,75" bh 2,000.00
Tee PVC Diameter 1" bh 4,000.00
Tee PVC Diameter 2" bh 6,000.00
Tee PVC Diameter 3" bh 8,000.00
Tee PVC Diameter 4" bh 14,000.00
Kran Diameter 0,5" bh 30,000.00
Fiet Kran Diameter 0,5" bh 45,000.00
Fiet Kran Diameter 0,75" bh 75,000.00
Fiet Kran Diameter 1" bh 120,000.00
Fiet Kran Diameter 2" bh 430,000.00
Fiet Kran Diameter 3" bh 890,000.00
Fiet Kran Diameter 4" bh 1,890,000.00
Macam2 Sambungan Paralon Ø 1/2" bh 5,000.00
Macam2 Sambungan Paralon Ø 3/4" bh 5,000.00
Macam2 Sambungan Paralon Ø 1" bh 18,000.00
Macam2 Sambungan Paralon Ø 1 1/4" bh 20,000.00
Macam2 Sambungan Paralon Ø 1 1/2" bh 20,000.00
Macam2 Sambungan Paralon Ø 1 3/4" bh 20,000.00
Macam2 Sambungan Paralon Ø 2" bh 20,000.00
Macam2 Samb. Paralon Ø 2 1/2" bh 20,000.00
Macam2 Samb. Paralon Ø 3" bh 50,000.00
Macam2 Samb. Paralon Ø 4" bh 60,000.00
Sambungan Pipa PVC Jenis AW 4 " TY bh 35,000.00
Lem Paralon bh 7,000.00
Solatip Leideng gl 3,000.00
Pipa PVC 4" berlobang jenis AW m1 50,000.00

L BAHAN SANITAIR
Stop Kran 1/2 " KIT bh 35,000.00
Stop Kran 3/4 " KIT bh 40,000.00
Stop Kran 1 " KIT bh 240,000.00
Stop Kran 1 1/2 " KIT bh 320,000.00
Stop Kran 2 " KIT bh 800,000.00
Stop Kran 2 1/2" KIT bh 900,000.00
Stop Kran 3 " KIT bh 1,300,000.00
Fiet kran 3/4" bh 75,000.00
Fiet kran 1" bh 90,000.00
Fiet kran 2" bh 250,000.00
Fiet kran 3" bh 560,000.00
Fiet kran 4" bh 900,000.00
Saringan Air Lt KM Stainless Steel bh 48,000.00
Page 19

1 2 3 4
Apooer Bath Tube bh 280,000.00
Kran stain less Lokal Kait bh 60,000.00
Shower Dengan Tiang bh 300,000.00
Shower Tanpa Tiang bh 250,000.00
Kran Tembok Sun Eui dia. 1/2 " bh 105,000.00
Kran Tembok ITAP dia. 1/2 " bh 42,000.00
Kran Bebek Sun Eui 1/2 " bh 180,000.00
Kran Bebek ITAP 1/2 " bh 65,000.00
Kran Zet Shower 1/2 " bh 80,000.00
Kran Panas Dingin San Eui Standard bh 500,000.00
Bath Cape Washteren unit 2,350,000.00
Tempat Sabun Poslin bh 52,000.00
Wastafel Lengkap TOTO LW 230 unit 1,400,000.00
Wastafel Lengkap INA unit 750,000.00
Wastafel Bulat Warna Standard Lengkap unit 1,600,000.00
Closet Duduk Poslin (INA) Lengkap set 1,900,000.00
Closet Jongkok Poslin (INA) bh 160,000.00
Closet Jongkok Teraso bh 95,000.00
Closet Jongkok Poslin warna TOTO unit 450,000.00
Closet Jongkok Standard Putih Poslin TOTO unit 220,000.00
Closet Jongkok Lengkap Sistem Jet TOTO unit 2,250,000.00
Closet Duduk Warna Standard TOTO C 240 Lengkap unit 2,400,000.00
Closet Duduk Warna Standard lengkap INA bh 1,500,000.00
Urinoar Lengkap TOTO Warna Standard lengkap unit 1,750,000.00
Penyekat Poslin Urinoar TOTO lbr 450,000.00
Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh 200,000.00
Kitchen Zink Stainless Non Standard Franke ( 1 Lobang ) bh 150,000.00
Kitchen Zink Stainless Non Standard Franke ( 2 Lobang ) bh 320,000.00
Bak Mandi Teraso bh 280,000.00
Bak Mandi Fiber Glass 60 x 60 cm bh 200,000.00
Floordrain stainless bh 28,000.00

M BAHAN PENUTUP ATAP


Atap Plastik Gelombang 80 x 180 lbr 26,000.00
Atap Fiber Glass Tipis 80 x 180 (gelombang) lbr 48,000.00
Atap Fiber Glass Tebal 80 x 180 (gelombang) lbr 90,000.00
Atap Genteng Metal Lapis Pasir m2 80,000.00
Bubung Metal Lapis Pasir m' 70,000.00
Kalisplank GRC m' 26,000.00
Atap Aluminium Natural USR 26 ( JAINDO ) m² 160,000.00
Atap Aluminium Warna USR 26 ( JAINDO ) m² 195,000.00
Atap Seng Gelombang BJLS 80 x 180 lbr 40,000.00
Atap Asbes Gel. Kecil 4 mm 80 x 180 lbr 39,000.00
Bubung Asbes lbr 28,000.00
Atap Asbes Gel. 4 mm 90 x 180 lbr 50,000.00
Atap Asbes Gel. 5 mm 90 x 180 lbr 60,000.00
Atap Asbes Gel. Besar 4 mm 90 x 240 lbr 70,000.00
Atap Asbes Gel. Besar 5 mm 90 x 240 lbr 80,000.00
Atap Genteng Plentong pres Bakar KW 1 bh 1,500.00
Page 20

1 2 3 4
Atap Genteng Plentong pres Molen Oven KW1 bh 1,800.00
Atap Genteng Flam pres Molen Oven Jatiwangi bh 1,300.00
Genting Morando bh 3,000.00
Bubung Genteng pres Bulat Ex Jatiwangi bh 5,500.00
Genteng Bubungan Ex Jatiwangi Segi Tiga bh 4,000.00
Genteng Bubungan Beton bh 5,000.00
Genteng Beton Warna 14,5/m2 bh 9,000.00
Genteng Beton Natural bh 6,000.00
Atap Genteng Beton Warna 14,5/m2 m² 95,000.00
Genteng Beton Natural m² 65,000.00
Sirap Kelas I ( 80 / m2 ) bh 22,000.00
Sirap m² 105,000.00
Genteng Keramik bh 9,000.00
Genteng Keramik Natural Intan 14,5 / m2 m² 84,000.00
Genteng Keramik Glasur Standard 14,5 / m2 m² 130,000.00
Genteng Keramik Glasur Special 14,5 / m2 m² 150,000.00
Genteng Keramik Glasur Premium 14,5 / m2 m² 155,000.00
Genteng Murando Natural 1m2 = 18 bh bh 3,000.00
Genteng Murando Glasur 1m2 = 20 bh bh 6,000.00
Genting Magas bh 2,000.00
Bubung Murando Natural bh 5,000.00
Bubung Murando Glasur bh 9,000.00
Bubungan Genteng Keramik bh 9,000.00
Bubungan Genteng Palentong bh 3,000.00
Bubungan Genting Flam bh 3,000.00
Bubungan Genting Magas eks banjar bh 4,000.00

N BAHAN ELEKTRIKAL
Ammeter bh 90,000.00
Arrester 3p+1N, tk 1 bh 1,470,000.00
Bonding bh 7,200.00
Busbar 100 A bh 90,000.00
CT 50/5 bh 60,000.00
conduit bh 4,800.00
Earthing Rood bh 360,000.00
Fuse set 8,400.00
Inbow panasonics bh 4,200.00
Kabel Data UTP Cat 5e m 9,600.00
Kabel NYM 2x2,5mm² m 9,600.00
Kabel NYM 3x2,5 mm² m 12,600.00
Kabel NYY 4x16 mm² m 104,700.00
Kabel NYY 4x10 mm² m 71,400.00
Kabel Telepon ITC 0,6 x2 m 1,800.00
Kawat BC 25 mm m 54,000.00
Kotak Kontak bh 14,400.00
Kotak Kontak AC bh 54,000.00
lampu baret 19 watt bh 240,000.00
Page 21

1 2 3 4
Lampu Indikator bh 14,400.00
Lampu Downlight 9 watt bh 109,250.00
Lampu RMI 2x36 watt bh 373,750.00
Lampu RMI 2X18 watt bh 336,950.00
Lampu Globe Ambiance 14 watt bh 86,250.00
Lampu SL 9 watt set 51,750.00
MCB 6 A 1 Fasa bh 47,400.00
MCB 10 A 1 Fasa bh 47,400.00
MCB 20 A 1 Fasa bh 47,400.00
MCCB 40 A 3 Fasa bh 409,200.00
MCCB 25 A 3 Fasa bh 409,200.00
MCCB 20 A 3 fasa bh 409,200.00
Outlet Data bh 54,000.00
Outlet Telepon bh 50,400.00
Outlet Lantai set 690,000.00
Panel 60x40x20 bh 1,080,000.00
Panel 40x60x20 bh 600,000.00
Saklar Ganda bh 17,250.00
Saklar Tunggal bh 13,225.00
Spitzen Petir 90 cm set 165,000.00
Voltmeter bh 82,500.00
Pipa GIP 1" m 55,000.00
Duradoost bh 16,500.00

O BAHAN ALAT PENGANTUNG DAN KUNCI


Door Closer Kelas Standard ( Kelas Sedang ) unt 180,000.00
Door Closer Kelas Standard ( Kelas Baik ) unt 650,000.00
Door Closer Kelas Rendah unt 150,000.00
Tarikan Almari Rata - rata bh 14,000.00
Reiling Tangga Stainlessteel m' 250,000.00
Tarikan Almari bh 12,500.00
Kunci Almari bh 15,000.00
Slot Almari bh 4,500.00
Engsel Almari bh 9,500.00
Engsel kupu-kupu bh 4,500.00
Jok bh 75,000.00
Plat gantungan Papan tulis bh 3,500.00
Paku uril 1" bh 300.00
Page 22

1 2 3 4

Q BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh 600,000.00
Tangki Air Fiber Glass 1 m3 ( Excel ) bh 1,100,000.00
Tangki Air Fiber Glass 2 m3 ( Excel ) bh 2,200,000.00
Tangki Air Stainless 1.6 m3 bh 3,200,000.00

R STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA
Stamper 8 Jam hari 200,000.00

S BAHAN BAKAR DAN PELUMAS


Minyak Tanah lt 11,000.00
Kapur Bakar *M081 m³ 120,000.00
Kayu Bakar *M070 m³ 65,000.00
Bahan Residu lt 2,000.00
Minyak Solar lt 4,500.00
Bensin Premium lt 4,500.00
Minyak Pelumas Bekisting Oli Bekas lt 3,500.00

0
0 Dibuat :
0

HERYANTO

0
0
HARGA SATUAN PEKERJAAN

NO. URAIAN JUMLAH

1 2 3

A.01.01 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK 50,100.00


A.01.02 1 M2 PEMBUATAN DIREKSI KEET DAN LOS BAHAN 339,600.00
A.01.03 1 M2 PAPAN NAMA PROYEK 153,800.00
A.01.04 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN 8,800.00
A.01.06 1 M3 BONGKARAN BETON BERTULANG 355,600.00
A.01.07 1 M2 BONGKARAN DINDING TEMBOK BATA MERAH 35,500.00
A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN 1 METER 39,000.00
A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN 2 METER 48,000.00
A.02.03 1 M3 GALIAN TANAH BIASA KEDALAMAN 3 METER 57,100.00
A.02.04 1 M3 GALIAN TANAH KERAS SEDALAM 1 METER 51,900.00
A.02.05 1 M3 GALIAN TANAH CADAS SEDALAM 1 METER 78,800.00
A.02.06 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER 62,800.00
A.02.07 1 M2 PEKERJAAN STRIPING TEBING TANAH SETINGGI 1 METER 2,800.00
A.02.08 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER 17,100.00
A.02.09 1 M3 URUGAN TANAH KEMBALI 13,000.00
A.02.10 1 M3 PEMADATAN TANAH 10,900.00
A.02.11 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR) 86,200.00
A.02.12 1 M3 URUGAN PASIR 147,600.00
A.02.13 1 M3 SIRTU PADAT UNTUK PENINGGIAN LANTAI BANGUNAN 159,500.00
A.02.14 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 3 PP : 7 TL UNTUK STABILISASI 175,300.00
A.02.15 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TL UNTUK STABILISASI 141,800.00
A.02.16 1 M2 MEMASANGAN LAPISAN IJUK TEBAL 10 CM UNTUK BIDANG RESAPAN 124,000.00
A.02.17 1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH 62,100.00
A.03.01 1 M3 PASANG AANSTAMPING BATU KOSONG 262,800.00
A.03.02 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 3 Ps 646,200.00
A.03.03 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 4 Ps 592,500.00
A.03.04 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 5 Ps 555,300.00
A.03.05 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 6 Ps 529,100.00
A.03.06 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 8 Ps 493,300.00
A.03.07 1 M3 PASANG PONDASI SIKLOP 60% BETON CAMPURAN 1 PC : 2 PB : 3 KR 2,357,800.00
DAN 40 % BATU BELAH
A.03.08 1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CM 667,500.00
A.03.09 1 M3 PASANGAN BATU BRONJONG 348,500.00
A.04.01 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR 14,400.00
A.04.02 1 M2 PASANG BEKISTING UNTUK PONDASI 136,600.00
A.04.03 1 M2 PASANG BEKISTING UNTUK SLOOF 147,100.00
A.04.04 1 M2 PASANG BEKISTING UNTUK KOLOM 399,100.00
A.04.05 1 M2 PASANG BEKISTING UNTUK BALOK 406,400.00
A.04.06 1 M2 PASANG BEKISTING UNTUK LANTAI 729,100.00
A.04.07 1 M2 PASANG BEKISTING UNTUK DINDING 472,800.00
A.04.08 1 M2 PASANG BEKISTING UNTUK TANGGA 345,300.00
0 Keuntungan Max. 10 % #REF!
A.04.10 1 M3 MEMBUAT BETON DENGAN MUTU K 225 1,195,300.00
A.04.11 1 M3 MEMBUAT BETON DENGAN MUTU K 275 1,208,900.00
A.04.12 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr 680,500.00
A.04.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr 940,300.00
A.04.14 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr 676,900.00

23 dari 113
1 2 3
A.04.15 1 M1 PEMBUATAN TIANG PANCANG (40 X 40) CM, BETON BERTULANG 908,700.00
A.04.16 1 M1 PEMBUATAN TIANG PANCANG (35 X 35) CM, BETON BERTULANG 690,500.00
A.04.17 1 M3 MEMBUAT PONDASI BETON BERTULANG (157.5000 kg BESI + BEKISTNG) 3,700,600.00
A.04.18 1 M3 MEMBUAT SLOOF 10/15 (204.4000 Kg Besi + Bekisting) 4,656,000.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.19 1 M3 MEMBUAT SLOOF 12/15 (172.9000 Kg Besi + Bekesting) 4,080,660.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.20 1 M3 MEMBUAT SLOOF 12/15 (259,0000 Kg Besi + Bekesting) 5,195,500.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.21 1 M3 MEMBUAT SLOOF 15/20 (117.6000 Kg Besi + Bekesting) 3,218,100.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.22 1 M3 MEMBUAT SLOOF 15/20 (180,6000 Kg Besi + Bekesting) 4,033,900.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.23 1 M3 MEMBUAT SLOOF 25/30 (112.0900 Kg Besi + Bekesting) 2,883,200.00
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.24 1 M3 MEMBUAT SLOOF 20/30 (154,0431 Kg Besi + Bekesting) 3,551,900.00
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.25 1 M3 MEMBUAT KOLOM 12/12 (211.2900 Kg Besi + Bekesting) 4,700,600.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.26 1 M3 MEMBUAT KOLOM 12/12 (314.9700 Kg Besi + Bekesting) 6,042,800.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.27 1 M3 MEMBUAT KOLOM 15/15 (141.3800 Kg Besi + Bekesting) 3,620,300.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.28 1 M3 MEMBUAT KOLOM 15/15 (223,4100 Kg Besi + Bekesting) 4,682,300.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.29 1 M3 MEMBUAT KOLOM 15/20 (117.5900 Kg Besi + Bekesting) 3,731,900.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.30 1 M3 MEMBUAT KOLOM 15/20 (180,5700 Kg Besi + Bekesting) 4,548,800.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.31 1 M3 MEMBUAT KOLOM 15/30 (132,4000 Kg Besi + Bekesting) 3,771,100.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.32 1 M3 MEMBUAT KOLOM 20/20 (92.0500 Kg Besi + Bekesting) 3,248,600.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.33 1 M3 MEMBUAT KOLOM 20/20 (142,4500 Kg Besi + Bekesting) 3,901,200.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.34 1 M3 MEMBUAT KOLOM 25/25 (100.1300 Kg Besi + Bekesting) 3,151,200.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.35 1 M3 MEMBUAT KOLOM 30/30 (171,6700 Kg Besi + Bekesting) 3,930,800.00
DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
A.04.36 1 M3 MEMBUAT KOLOM 25/40 (166,3200 Kg Besi + Bekesting) 3,983,500.00
DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
A.04.37 1 M3 MEMBUAT RING BALK 10/15 (204.4000 Kg Besi + Bekesting) 5,033,000.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.38 1 M3 MEMBUAT RING BALK 10/15 (280.0000 Kg Besi + Bekesting) 6,011,700.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 20 CM
A.04.39 1 M3 MEMBUAT RING BALK 12/15 (172.9000 Kg Besi + Bekesting) 4,470,500.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.40 1 M3 MEMBUAT RING BALK 15/15 (141.4000 Kg Besi + Bekesting) 3,887,500.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
A.04.41 1 M3 MEMBUAT RING BALK 15/15 (212,8000 Kg Besi + Bekesting) 4,811,900.00

24 dari 113
1 2 3
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
A.04.42 1 M3 MEMBUAT RING BALK 15/20 (117,6000 Kg Besi + Bekesting) 3,502,100.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.43 1 M3 MEMBUAT RING BALK 15/20 (180,6000 Kg Besi + Bekesting) 4,317,800.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.44 1 M3 MEMBUAT RING BALK 15/25 ( 98.1900 Kg Besi + Bekesting) 3,200,300.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.04.45 1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting) 3,896,400.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.46 1 M3 MEMBUAT RING BALK 15/25 (201,7900 Kg Besi + Bekesting) 4,541,700.00
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.04.47 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.8 JARAK 10 cm TEBAL 6 cm 4,323,000.00
A.04.48 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 10 cm TEBAL 8 cm 3,630,700.00
A.04.49 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm 3,842,500.00
A.04.50 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm 4,600,300.00
A.04.51 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm 4,083,400.00
A.04.52 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 15 cm TEBAL 12 cm 5,153,800.00
A.04.53 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 15 cm TEBAL 20 cm 3,802,600.00
A.04.54 1 M3 PEK. Plat Beton Tulang, Tulangan 2 Lapis DIA.16-17.5 cm dan DIA. 10-12.5 cm Tebal 20 cm 3,977,100.00
A.04.55 1 M3 PEK. Plat Beton Tulang, Tulangan 2 Lapis DIA.16 - 15 CM dan DIA. 12 - 15 cm Tebal 20 cm 4,396,800.00
A.05.01 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps 185,700.00
A.05.02 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps 102,800.00
A.05.03 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps 96,200.00
A.05.04 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps 92,400.00
A.05.05 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps 89,900.00
A.05.06 1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.20) CAMP 1 PC : 4 PS 212,600.00
A.05.07 1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.15) CAMP 1 PC : 4 PS 166,400.00
A.05.08 1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.10) CAMP 1 PC : 4 PS 122,300.00
A.05.09 1 M2 PASANGAN DINDING DINDING ROSTER/TERAWANG (12X11X24) KERAMIK CAMP 1 PC : 4 PS 1,034,300.00
A.06.01 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIAN 44,900.00
A.06.02 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIAN 41,600.00
A.06.03 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN 39,400.00
A.06.04 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN 38,100.00
A.06.05 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 20 MM + ACIAN 60,000.00
A.06.06 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 20 MM + ACIAN 48,100.00
A.06.07 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 20 MM + ACIAN 52,700.00
A.06.08 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM + ACIAN 51,000.00
A.06.09 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM + ACIAN 55,300.00
A.06.10 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 25 MM + ACIAN 52,600.00
A.06.11 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM + ACIAN 49,600.00
A.06.12 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 25 MM + ACIAN 47,500.00
A.06.13 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 30 MM + ACIAN 67,800.00
A.06.14 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 30 MM + ACIAN 61,500.00
A.06.15 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 30 MM + ACIAN 57,800.00
A.06.16 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 30 MM + ACIAN 53,400.00
A.06.17 1 M2 PASANGAN PLESTERAN SKONING 1 Pc : 2 Ps, LEBAR 10 MM 35,900.00
A.06.18 1 M2 PASANGAN PLESTERAN CIPRAT, 1 Pc : 2 Ps 30,500.00
A.06.19 1 M2 PASANGAN PLESTERAN SIAR ADUKAN 1 Pc : 2 Ps 38,000.00
A.06.20 1 M2 ACIAN PC 22,800.00
A.07.01 1 M2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU 45,300.00
A.07.02 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER 237,300.00

25 dari 113
1 2 3
A.07.03 1 M2 PASANG RANGKA DINDING PEMISAH (60 X 120 CM ) KAYU KAYU LOKAL KLS II 111,600.00
A.07.04 1 M2 PASANG DINDING PEMISAH , RANGKA KAYU KAMPER 244,100.00
A.07.05 1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER 381,100.00
A.07.06 1 M2 PASANG PLYWOOD TEBAL 4 mm, UNTUK DINDING 60,600.00
A.07.07 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATI 14,051,900.00
A.07.08 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAMPER 11,026,900.00
A.07.09 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATI 14,879,100.00
A.07.10 1 M2 PASANGAN PINTU KLAMP KAYU KAMPER 448,500.00
A.07.11 1 M2 PASANGAN PINTU KLAMP KAYU KAYU LOKAL KLS II 199,900.00
A.07.12 1 M2 PASANGAN PINTU PANEL KAYU JATI 743,600.00
A.07.13 1 M2 PASANGAN PINTU PANEL KAYU KAMPER 633,600.00
A.07.14 1 M2 PASANGAN PINTU PANEL KAYU JATI 743,600.00
A.07.15 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II LAPIS ALUMUNIUM 517,000.00
A.07.16 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATI 500,700.00
A.07.17 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAMPER 434,700.00
A.07.18 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATI 500,700.00
A.07.19 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATI 1,020,800.00
A.07.20 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU KAMPER 844,800.00
A.07.21 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU LOKAL KLS II 447,000.00
A.07.22 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI 655,300.00
A.07.23 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER 584,900.00
A.07.24 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II 425,800.00
A.07.25 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU JATI 622,800.00
A.07.26 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA EXPOSE KAMPER BANJAR 554,100.00
A.07.27 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU LOKAL KLS II 398,700.00
A.07.28 1 M2 PASANG PINTU PLYWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU JATI 738,800.00
A.07.29 1 M2 PASANG PINTU PLYWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU KAMPER 626,000.00
A.07.30 1 M2 PASANG PINTU PLYWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU LOKAL KLS II 514,700.00
A.07.31 1 M2 PASANG PINTU TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU JATI 716,800.00
A.07.32 1 M2 PASANG PINTU TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA KAYU KAMPER DI VERNIS 661,200.00
A.07.33 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU LOKAL KLS II (DIVERNIS) 505,900.00
A.07.34 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI 766,300.00
A.07.35 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU KAMPER BANJAR 774,500.00
A.07.36 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU LOKAL KLS II 586,200.00
A.07.37 1 M2 PASANGAN JALUSI MATI KUSEN KAYU JATI 901,200.00
A.07.38 1 M2 PASANGAN JALUSI MATI KUSEN KAYU KAMPER 736,200.00
A.07.39 1 M2 PASANGAN JALUSI MATI KUSEN KAYU LOKAL KLS II 363,300.00
A.08.01 1 M3 PASANG KONSTRUKSI KUDA - KUDA KONVENSIONAL KAYU KELAS I, II, DAN III BENTANG 6 M 1,443,400.00
A.08.02 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU JATI 13,312,400.00
A.08.03 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KAMPER BANJAR 10,287,400.00
A.08.04 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KRUING 6,052,400.00
A.08.05 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA KAYU KAYU LOKAL KLS II 3,874,400.00
A.08.06 1 M3 PASANG KONSTRUKSI GORDENG KAYU KELAS II 3,376,100.00
A.08.07 1 M2 PASANG RANGKA ATAP GENTENG KODOK KAYU KAMPER 142,300.00
A.08.08 1 M2 PASANG RANGKA ATAP GENTENG PALENTONG KAYU LOKAL KLS II 60,700.00
A.08.09 1 M2 PASANG RANGKA ATAP GENTENG PALENTONG KAYU ALBASIAH 53,000.00
A.08.10 1 M2 PASANG RANGKA ATAP GENTENG BETON KAYU KAYU LOKAL KLS II 83,100.00
A.08.11 1 M2 PASANG RANGKA ATAP SIRAP KAYU KAMPER BANJAR 155,200.00
A.08.12 1 M2 PASANG RANGKA ATAP SIRAP KAYU LOKAL KLS II 59,000.00
A.08.13 1 M2 PASANG ATAP GENTENG MORANDO NATURAL (18 BH) 71,800.00
A.08.14 1 M2 PASANG ATAP GENTENG BETON 90,400.00

26 dari 113
1 2 3
A.08.15 1 M2 PASANG ATAP GENTENG PALENTONG 54,800.00
A.08.16 1 M2 PASANG ATAP GENTENG FLAM 49,300.00
A.08.17 1 M1 PASANG BUBUNG GENTENG MORANDO NATURAL 72,700.00
A.08.18 1 M1 PASANG BUBUNG GENTENG PALENTONG 67,200.00
A.08.19 1 M1 PASANG BUBUNG GENTENG FLAM 67,200.00
A.08.20 1 M2 PASANG ATAP ASBES GELOMBANG (2.40 x 0.90 m) x 5 mm 69,200.00
A.08.21 1 M2 PASANG ATAP ASBES GELOMBANG (1.80 x 0.90 m) x 5 mm 55,600.00
A.08.22 1 M2 PASANG ATAP ASBES GELOMBANG (2.40 x 0.90 m) x 4 mm 62,700.00
A.08.23 1 M1 PASANG NOK ASBES GELOMBANG , 4 mm 41,300.00
A.08.24 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU JATI 146,600.00
A.08.25 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU KAMPER 116,900.00
A.08.26 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU LOKAL KLS II 49,800.00
A.08.27 1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU ALBASIAH 44,500.00
A.08.28 1 M1 PASANG LISPLANK UKURAN (3 x 30) cm, KAYU JATI 148,000.00
A.08.29 1 M1 PASANG LISPLANK UKURAN (3 x 30) cm, KAYU KAMPER 117,700.00
A.08.30 1 M1 PASANG LISPLANK UKURAN (3 x 30) cm, KAYU LOKAL KLS II 49,300.00
A.08.31 1 M1 PASANG LISPLANK UKURAN 2 x (3 x 20) cm, KAYU KAMPER 160,200.00
A.08.32 1 M1 PASANG LISPLANK UKURAN 2 x (2 x 20) cm, KAYU KAMPER 92,900.00
A.08.33 1 M1 PASANG LISPLANK UKURAN 2 x (2 x 20) cm, KAYU LOKAL KLS II 40,000.00
A.08.34 1 M1 PASANG TALANG DATAR/JURAI SENG BJLS 128,600.00
A.08.35 1 M1 PASANG TALANG 1/2 LINGKARAN D-15 CM, SENG BJLS 69,600.00
A.09.01 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU JATI 208,500.00
A.09.02 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU KAMPER 166,100.00
A.09.03 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU LOKAL KLS II 76,300.00
A.09.04 1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU ALBASIAH 67,900.00
A.09.05 1 M2 PASANG RANGKA LANGIT - LANGIT (60 x 60) cm, KAYU LOKAL KLS II 77,000.00
A.09.06 1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm 19,200.00
A.09.07 1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm 38,100.00
A.09.08 1 M1 PASANG LIST PLAFOND PROFIL KAYU KAMPER BANJAR 4/4 CM 11,100.00
A.09.09 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4 10,000.00
A.10.01 1 M2 PASANG LANTAI KERAMIK WARNA 10 X 20 CM 159,700.00
A.10.02 1 M2 PASANG LANTAI KERAMIK WARNA 10 X 33 CM 228,600.00
A.10.03 1 M2 PASANG LANTAI KERAMIK WARNA 20 X 20 CM 155,600.00
A.10.04 1 M2 PASANG LANTAI TEGEL BADAK ABU-ABU UKURAN 30 X 30 CM 96,500.00
A.10.05 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS 148,100.00
A.10.06 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP 160,200.00
A.10.07 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM 176,500.00
A.10.08 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM ANTISLIP 182,500.00
A.10.09 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM 130,300.00
A.10.10 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40X40 CM 491,700.00
A.10.11 1 M2 PASANG LANTAI MARMER 376,900.00
A.10.12 1 M2 PASANG LANTAI PARQUET JATI 593,200.00
A.10.13 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH 170,500.00
A.10.14 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA 182,600.00
A.10.15 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, PUTIH 169,800.00
A.10.16 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, WARNA 175,800.00
A.10.17 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, PUTIH 164,400.00
A.10.18 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, WARNA 170,500.00
A.10.19 1 M2 PASANG DINDING KERAMIK 20 X 25 CM 170,500.00
A.10.20 1 M2 PASANG DINDING MARMER 494,000.00

27 dari 113
1 2 3
A.10.21 1 M2 PASANG PLINT KAYU 2 X 10 CM 50,300.00
A.10.22 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM) 104,400.00
A.10.23 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM) 109,400.00
A.10.24 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM) 112,200.00
A.10.25 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM) 117,700.00
A.10.26 1 M2 PASANGAN LANTAI BATU SIKAT 266,200.00
A.10.27 1 M2 PASANGAN BATU CANDI 174,200.00
A.10.28 1 M3 PASANGAN BATU TEMPEL+ SIARAN 234,700.00
A.10.29 1 M2 PASANG DINDING BATU TEMPEL 278,700.00
A.11.01 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK 3,046,700.00
A.11.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN 454,300.00
A.11.03 MEMASANG 1 BUAH URINOIR 2,643,100.00
A.11.04 MEMASANG 1 BUAH WASTAFEL 1,908,600.00
A.11.05 MEMASANG 1 BUAH BAK MANDI TRASO VOLUME 0,3 M3 485,200.00
A.11.06 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3 573,900.00
A.11.07 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3 12,349,400.00
A.11.08 MEMASANG 1 BUAH BADKIP PORSELEN 3,179,800.00
A.12.01 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5" 36,900.00
A.12.02 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75" 41,100.00
A.12.03 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1" 56,800.00
A.12.04 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5" 87,100.00
A.12.05 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3" 189,400.00
A.12.06 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4" 250,900.00
A.12.07 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" 16,900.00
A.12.08 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75" 22,500.00
A.12.09 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1" 26,700.00
A.12.10 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5" 26,700.00
A.12.11 1 M2 PASANG KACA, TEBAL 8 MM 230,700.00
A.12.12 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5" 74,500.00
A.12.13 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3" 82,400.00
A.12.14 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4" 99,400.00
A.12.15 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL 274,300.00
A.12.16 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" 40,900.00
A.12.17 MEMASANG 1 BH FLOOR DRAIN 38,600.00
A.13.01 1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA ( KANTOR TYPE BESAR ) 10,182,000.00
A.13.02 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA ( KANTOR TYPE KECIL ) 6,406,200.00
A.13.03 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL) 3,797,100.00
A.13.04 Memasang 1 Buah Bak Kontrol, Pas. Batu Bata ukuran (30X30) Tinggi 35 CM 344,500.00
A.13.05 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran (45X45) Tinggi 50 CM 292,900.00
A.13.06 Memasang 1 Buah Bak Kontrol Pas. Batu Bata ukuran (60X60) Tinggi 65 CM 453,400.00
A.13.07 1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGAN 191,900.00
A.13.08 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN 203,000.00
A.14.01 1 BUAH PASANG KUNCI TANAM BIASA 133,500.00
A.14.02 1 BUAH PASANG KUNCI TANAM KAMAR MANDI 94,200.00
A.14.03 1 BUAH PASANG KUNCI SILINDER 336,100.00
A.14.04 1 BUAH PASANG ENGSEL PINTU 31,500.00
A.14.05 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU 19,900.00
A.14.06 1 BUAH PASANG KAIT ANGIN 27,300.00
A.14.07 1 BUAH PASANG DOOR CLOSER 237,200.00
A.14.08 1 BUAH PASANG KUNCI SELOT PINTU 32,100.00

28 dari 113
1 2 3
A.14.09 1 BUAH PASANG TARIKAN PINTU 110,700.00
A.14.10 1 BUAH PASANG REL PINTU DORONG 322,000.00
A.15.01 1 M2 PASANG KACA, TEBAL 3 MM 72,200.00
A.15.02 1 M2 PASANG KACA, TEBAL 5 MM 84,300.00
A.15.03 1 M2 PASANG KACA, TEBAL 8 MM 230,700.00
A.15.04 1 M2 PASANG KACA PATRI, TEBAL 5 MM 453,400.00
A.16.01 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU ATAU TER 6,100.00
A.16.02 1 M2 PENGECATAN BIDANG CANSTIN (CAT SEKELAS ICI EKSTERIOR) 25,300.00
A.16.03 1 M2 PENGECATAN PLAFOND DAN DINDING (INTERIOR ICI) 55,500.00
A.16.04 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x) 55,500.00
A.16.05 1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x) 13,500.00
A.16.06 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x) 24,100.00
A.16.07 1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x) 20,000.00
A.16.08 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI 39,600.00
A.16.9 1 M2 PLITURAN BIDANG KAYU (BIASA) 35,600.00
A.16.10 1 M2 PENGECATAN BESI (3X) 41,900.00
A.16.11 1 M2 PENGECATAN BIDANG KAYU LAMA BERCAT 31,100.00
A.16.12 1 M2 PENGECATAN DINDING (LAMA) 12,100.00
A.17.01 1 KG PEK. ERECTION KONST KUDA-KUDA BESI 1,000.00
A.17.02 1 KG PASANG RANGKA ATAP BAJA 22,600.00
A.17.03 1 KG PEKERJAAN RANGKA KUDA-KUDA BAJA IWF 23,500.00
A.17.04 1 KG PEK. KONSTRUKSI BESI SIKU / PROFIL EX. DN 22,100.00
A.17.05 1 M2 PEKERJAAN BONDEX 189,600.00
A.17.06 1 M2 PEKERJAAN WIREMESH M8 69,500.00
A.17.07 1 Titik PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL = KAWAT 4 MM 2,500.00
A.17.08 1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR 4,600.00
A.17.09 1 M2 PASANG ROLLING DOOR 763,800.00
A.17.10 1 M2 PASANG PINTU ALUMINIUM 360,100.00
A.17.11 1 M2 PASANG TERALIS BESI 257,200.00
A.17.12 1 M2 PASANG JENDELA NAKO DAN TRALIS 116,100.00
A.17.13 1 M1 PEK.PAGAR DEPAN TRALIS STANDARD 1,226,500.00
A.17.14 1 M1 PEK. PAGAR BELAKANG / SAMPING 562,400.00
A.18.01 1 M2 PENGASPALAN MANUAL 53,600.00
A.18.02 1 M2 PENGASPALAN MANUAL 24,390.00

29 dari 113
Page 30

ANALISA SATUAN PEKERJAAN


PEKERJAAN PEMBANGUNAN KAMAR TYPE DELUXE ROOM
LOKASI PANGANDARAN
TAHUN ANGGARAN 2013

NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH


1 2 3 4 5 6=(3x5)
A.01.01 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK
BAHAN :
Kayu 5/7 Albasiah 0.0120 m2 1,700,000.00 20,400.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.0200 kg 18,000.00 360.00
Kayu Papan 3/20 Kayu Albasiah 0.0070 m3 1,900,000.00 13,300.00
Jumlah Bahan 34,060.00
UPAH :
Pekerja 0.1000 Oh 45,000.00 4,500.00
Tukang Kayu 0.1000 Oh 60,000.00 6,000.00
Kepala Tukang 0.0100 Oh 65,000.00 650.00
Mandor 0.0050 Oh 70,000.00 350.00
Jumlah Pekerja 11,500.00
Jumlah Bahan + Pekerja 45,560.00
Keuntungan Max. 10 % 4,556.00
Jumlah Total 50,116.00
Dibulatkan 50,100.00
A. STG 1 M2 PEK. STEGER BAMBU

Bambu dia. 6-8/600 cm 6.0000 Btg 9,000.00 54,000.00


Tali Ijuk 0.2500 Kg 35,000.00 8,750.00
Jumlah Bahan 62,750.00
Pekerja 0.1500 Org 45,000.00 6,750.00
Mandor 0.0170 Org 70,000.00 1,190.00
Jumlah 7,940.00
Jumlah Bahan + Pekerja 70,690.00
Keuntungan Max. ### 7,069.00
Jumlah 70,690.00
Dibulatkan 70,690.00
A.01.06.a 1 m2 Pembuatan Stoot Werk Bambu
BAHAN :
Bambu dia. 6-8 = T 4 m 6.000 bh 4,000.00 24,000.00
Tali Ijuk 0.250 Kg 35,000.00 8,750.00
Jumlah Bahan 32,750.00
UPAH :
Pekerja 0.017 Oh 45,000.00 765.00
Mandor 0.015 Oh 70,000.00 1,050.00
Jumlah Pekerja 1,815.00
Jumlah Bahan + Pekerja 34,565.00
Keuntungan Max. 10% 3,456.50
Jumlah Total 38,021.50
Dibulatkan 38,000.00
Page 31

1 2 3 4 5 6=(3x5)
A.01.07 1 M2 BONGKARAN DINDING TEMBOK BATA MERAH
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.6667 Oh 45,000.00 30,001.50
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 32,311.50
Jumlah Bahan + Pekerja 32,311.50
Keuntungan Max. 10 % 3,231.15
Jumlah Total 35,542.65
Dibulatkan 35,500.00
A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN 1 METER
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.7500 Oh 45,000.00 33,750.00
Mandor 0.0250 Oh 70,000.00 1,750.00
Jumlah Pekerja 35,500.00
Jumlah Bahan + Pekerja 35,500.00
Keuntungan Max. 10 % 3,550.00
Jumlah Total 39,050.00
Dibulatkan 39,000.00
A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN 2 METER
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.9000 Oh 45,000.00 40,500.00
Mandor 0.0450 Oh 70,000.00 3,150.00
Jumlah Pekerja 43,650.00
Jumlah Bahan + Pekerja 43,650.00
Keuntungan Max. 10 % 4,365.00
Jumlah Total 48,015.00
Dibulatkan 48,000.00
A.02.09 1 M3 URUGAN TANAH KEMBALI
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 45,000.00 11,250.00
Mandor 0.0083 Oh 70,000.00 581.00
Jumlah Pekerja 11,831.00
Jumlah Bahan + Pekerja 11,831.00
Keuntungan Max. 10 % 1,183.10
Jumlah Total 13,014.10
Dibulatkan 13,000.00
Page 32

1 2 3 4 5 6=(3x5)
A.02.10 1 M3 PEMADATAN TANAH
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.1920 Oh 45,000.00 8,640.00
Mandor 0.0190 Oh 70,000.00 1,330.00
Jumlah Pekerja 9,970.00
Jumlah Bahan + Pekerja 9,970.00
Keuntungan Max. 10 % 997.00
Jumlah Total 10,967.00
Dibulatkan 10,900.00
A.02.11 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)
BAHAN :
Tanah Urug (didatangkan) 1.2000 m3 25,000.00 30,000.00

Jumlah Bahan 30,000.00


UPAH :
Pekerja 0.4500 Oh 45,000.00 20,250.00
Mandor 0.0450 Oh 70,000.00 3,150.00
Alat Bantu (sewa Stamper) 0.1250 Oh 200,000.00 25,000.00
Jumlah Pekerja 48,400.00
Jumlah Bahan + Pekerja 78,400.00
Keuntungan Max. 10 % 7,840.00
Jumlah Total 86,240.00
Dibulatkan 86,200.00
A.02.12 1 M3 URUGAN PASIR
BAHAN :
Pasir Urug 1.2000 m3 100,000.00 120,000.00

Jumlah Bahan 120,000.00


UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Mandor 0.0100 Oh 70,000.00 700.00
Jumlah Pekerja 14,200.00
Jumlah Bahan + Pekerja 134,200.00
Keuntungan Max. 10 % 13,420.00
Jumlah Total 147,620.00
Dibulatkan 147,600.00
A.02.13 1 M3 SIRTU PADAT UNTUK PENINGGIAN LANTAI BANGUNAN
BAHAN :
Sirtu 1.2000 m3 110,000.00 132,000.00

Jumlah Bahan 132,000.00


UPAH :
Pekerja 0.2500 Oh 45,000.00 11,250.00
Mandor 0.0250 Oh 70,000.00 1,750.00
Jumlah Pekerja 13,000.00
Jumlah Bahan + Pekerja 145,000.00
Keuntungan Max. 10 % 14,500.00
Jumlah Total 159,500.00
Dibulatkan 159,500.00
Page 33

1 2 3 4 5 6=(3x5)
A.02.16 1 M2 MEMASANGAN LAPISAN IJUK TEBAL 10 CM UNTUK BIDANG RESAPAN
BAHAN :
Injuk 6.0000 kg 17,500.00 105,000.00

Jumlah Bahan 105,000.00


UPAH :
Pekerja 0.1500 Oh 45,000.00 6,750.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 7,800.00
Jumlah Bahan + Pekerja 112,800.00
Keuntungan Max. 10 % 11,280.00
Jumlah Total 124,080.00
Dibulatkan 124,000.00
A.03.01 1 M3 PASANG AANSTAMPING BATU KOSONG
BAHAN :
Batu Belah 15/20 1.2000 m3 110,000.00 132,000.00
Pasir Urug 0.4320 m 3
100,000.00 43,200.00
Jumlah Bahan 175,200.00
UPAH :
Pekerja 0.7800 Oh 45,000.00 35,100.00
Tukang Batu 0.3900 Oh 60,000.00 23,400.00
Kepala Tukang 0.0390 Oh 65,000.00 2,535.00
Mandor 0.0390 Oh 70,000.00 2,730.00
Jumlah Pekerja 63,765.00
Jumlah Bahan + Pekerja 238,965.00
Keuntungan Max. 10 % 23,896.50
Jumlah Total 262,861.50
Dibulatkan 262,800.00
A.03.04 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 5 Ps
BAHAN :
Batu Belah 15/20 1.2000 m3 110,000.00 132,000.00
Semen Portland 136.0000 kg 1,360.00 184,960.00
Pasir Pasang 0.5440 m3 120,000.00 65,280.00
Jumlah Bahan 382,240.00
UPAH :
Pekerja 1.5000 Oh 45,000.00 67,500.00
Tukang Batu 0.7500 Oh 60,000.00 45,000.00
Kepala Tukang 0.0750 Oh 65,000.00 4,875.00
Mandor 0.0750 Oh 70,000.00 5,250.00
Jumlah Pekerja 122,625.00
Jumlah Bahan + Pekerja 504,865.00
Keuntungan Max. 10 % 50,486.50
Jumlah Total 555,351.50
Dibulatkan 555,300.00
A.03.05 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 6 Ps
BAHAN :
Batu Belah 15/20 1.2000 m3 110,000.00 132,000.00
Semen Portland 117.0000 kg 1,360.00 159,120.00
Pasir Pasang 0.5610 m3 120,000.00 67,320.00
Jumlah Bahan 358,440.00
UPAH :
Pekerja 1.5000 Oh 45,000.00 67,500.00
Tukang Batu 0.7500 Oh 60,000.00 45,000.00
Kepala Tukang 0.0750 Oh 65,000.00 4,875.00
Mandor 0.0750 Oh 70,000.00 5,250.00
Jumlah Pekerja 122,625.00
Page 34

1 2 3 4 5 6=(3x5)
Jumlah Bahan + Pekerja 481,065.00
Keuntungan Max. 10 % 48,106.50
Jumlah Total 529,171.50
Dibulatkan 529,100.00
A.03.06 1 M3 PASANG PONDASI BATU BELAH 1 Pc : 8 Ps
BAHAN :
Batu Belah 15/20 1.2000 m3 110,000.00 132,000.00
Semen Portland 91.0000 kg 1,360.00 123,760.00
Pasir Pasang 0.5840 m 3
120,000.00 70,080.00
Jumlah Bahan 325,840.00
UPAH :
Pekerja 1.5000 Oh 45,000.00 67,500.00
Tukang Batu 0.7500 Oh 60,000.00 45,000.00
Kepala Tukang 0.0750 Oh 65,000.00 4,875.00
Mandor 0.0750 Oh 70,000.00 5,250.00
Jumlah Pekerja 122,625.00
Jumlah Bahan + Pekerja 448,465.00
Keuntungan Max. 10 % 44,846.50
Jumlah Total 493,311.50
Dibulatkan 493,300.00
A.03.07 1 M3 PASANG PONDASI SIKLOP 60% BETON CAMPURAN 1 PC : 2 PB : 3 KR
DAN 40 % BATU BELAH
BAHAN :
Batu Belah 15/20 0.4800 m3 110,000.00 52,800.00
Semen Portland 194.0000 kg 1,360.00 263,840.00
Pasir Beton 0.3120 m3 135,000.00 42,120.00
Batu Pecah 2/3 0.4680 m3 175,000.00 81,900.00
Besi Beton 126.0000 kg 11,500.00 1,449,000.00
Kawat Beton 1.8000 kg 18,000.00 32,400.00
Jumlah Bahan 1,922,060.00
UPAH :
Pekerja 3.4000 Oh 45,000.00 153,000.00
Tukang Batu 0.8500 Oh 60,000.00 51,000.00
Kepala Tukang 0.0850 Oh 65,000.00 5,525.00
MAndor 0.1700 Oh 70,000.00 11,900.00
Jumlah Pekerja 221,425.00
Jumlah Bahan + Pekerja 2,143,485.00
Keuntungan Max. 10 % 214,348.50
Jumlah Total 2,357,833.50
Dibulatkan 2,357,800.00
A.03.08 1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CM
BAHAN :
Batu Belah 15/20 0.4500 m3 110,000.00 49,500.00
Semen Portland 194.0000 kg 1,360.00 263,840.00
Pasir Beton 0.3120 m3 135,000.00 42,120.00
Batu Pecah 2/3 0.4680 m3 175,000.00 81,900.00
Jumlah Bahan 437,360.00
UPAH :
Pekerja 2.4000 Oh 45,000.00 108,000.00
Tukang Batu 0.8000 Oh 60,000.00 48,000.00
Kepala Tukang 0.0800 Oh 65,000.00 5,200.00
Mandor 0.1190 Oh 70,000.00 8,330.00
Jumlah Pekerja 169,530.00
Jumlah Bahan + Pekerja 606,890.00
Keuntungan Max. 10 % 60,689.00
Jumlah Total 667,579.00
Page 35

1 2 3 4 5 6=(3x5)
Dibulatkan 667,500.00
A.03.09 1 M3 PASANGAN BATU BRONJONG
BAHAN :
Batu Bronjong 1.2000 m3 110,000.00 132,000.00
Kawat Bronjong 4 mm 8.0000 m3 13,000.00 104,000.00
Jumlah Bahan 236,000.00
UPAH :
Pekerja 1.5000 Oh 45,000.00 67,500.00
Tukang Besi 0.2000 Oh 60,000.00 12,000.00
Mandor 0.0200 Oh 70,000.00 1,400.00
Jumlah Pekerja 80,900.00
Jumlah Bahan + Pekerja 316,900.00
Keuntungan Max. 10 % 31,690.00
Jumlah Total 348,590.00
Dibulatkan 348,500.00
A.04.01 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
BAHAN :
Besi Beton (Polos / ulir) 1.0500 kg 11,500.00 12,075.00
Kawat Beton 0.0150 kg 18,000.00 270.00
Jumlah Bahan 12,345.00
UPAH :
Pekerja 0.0070 Oh 45,000.00 315.00
Tukang Besi 0.0070 Oh 60,000.00 420.00
Kepala Tukang 0.0007 Oh 65,000.00 45.50
Mandor 0.0004 Oh 70,000.00 28.00
Jumlah Pekerja 808.50
Jumlah Bahan + Pekerja 13,153.50
Keuntungan Max. 10 % 1,315.35
Jumlah Total 14,468.85
Dibulatkan 14,400.00
Page 36

1 2 3 4 5 6=(3x5)
A.04.01.1 1 Kg PEMBESIAN DENGAN BESI U.24
BAHAN :
Besi Beton U.24 1.0500 kg 11,500.00 12,075.00
Kawat Beton 0.0150 kg 18,000.00 270.00
Jumlah Bahan 12,345.00
UPAH :
Pekerja 0.0070 Oh 45,000.00 315.00
Tukang Besi 0.0070 Oh 60,000.00 420.00
Kepala Tukang 0.0007 Oh 65,000.00 45.50
Mandor 0.0004 Oh 70,000.00 28.00
Jumlah Pekerja 808.50
Jumlah Bahan + Pekerja 13,153.50
Keuntungan Max. 10 % 1,315.35
Jumlah Total 14,468.85
Dibulatkan 14,400.00
A.04.01.2 1 Kg PEMBESIAN DENGAN BESI U.32
BAHAN :
Besi Beton U.32 1.0500 kg 11,500.00 12,075.00
Kawat Beton 0.0150 kg 18,000.00 270.00
Jumlah Bahan 12,345.00
UPAH :
Pekerja 0.0070 Oh 45,000.00 315.00
Tukang Besi 0.0070 Oh 60,000.00 420.00
Kepala Tukang 0.0007 Oh 65,000.00 45.50
Mandor 0.0004 Oh 70,000.00 28.00
Jumlah Pekerja 808.50
Jumlah Bahan + Pekerja 13,153.50
Keuntungan Max. 10 % 1,315.35
Jumlah Total 14,468.85
Dibulatkan 14,400.00
A.04.02.1 1 M2 PASANG BEKISTING UNTUK PONDASI 2 X PAKAI
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.3000 m³ 18,000.00 5,400.00
Minyak Bekisting 0.1000 ltr 3,500.00 350.00
Jumlah Bahan 43,750.00
UPAH :
Pekerja 0.5200 Oh 45,000.00 23,400.00
Tukang Kayu 0.2600 Oh 60,000.00 15,600.00
Kepala Tukang 0.0260 Oh 65,000.00 1,690.00
Mandor 0.0260 Oh 70,000.00 1,820.00
Jumlah Pekerja 42,510.00
Jumlah Bahan + Pekerja 86,260.00
Keuntungan Max. 10 % 8,626.00
Jumlah Total 94,886.00
Dibulatkan 94,800.00
Page 37

1 2 3 4 5 6=(3x5)
A.04.03.1 1 M2 PASANG BEKISTING UNTUK SLOOF 2 X PAKAI
BAHAN :
Kayu Terentang Albasiah, Papan 0.0225 m³ 1,900,000.00 42,750.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.3000 m³ 18,000.00 5,400.00
Minyak Bekisting 0.1000 m³ 3,500.00 350.00
Jumlah Bahan 48,500.00
UPAH :
Pekerja 0.5200 Oh 45,000.00 23,400.00
Tukang Kayu 0.2600 Oh 60,000.00 15,600.00
Kepala Tukang 0.0260 Oh 65,000.00 1,690.00
Mandor 0.0260 Oh 70,000.00 1,820.00
Jumlah Pekerja 42,510.00
Jumlah Bahan + Pekerja 91,010.00
Keuntungan Max. 10 % 9,101.00
Jumlah Total 100,111.00
Dibulatkan 100,100.00
A.04.04.1 1 M2 PASANG BEKISTING UNTUK KOLOM 2 X PAKAI
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0075 m³ 2,200,000.00 16,500.00
Triplek 4 mm 0.1750 lbr 60,000.00 10,500.00
Bambu 2.0000 btg 7,000.00 14,000.00
Jumlah Bahan 86,900.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 140,855.00
Keuntungan Max. 10 % 14,085.50
Jumlah Total 154,940.50
Dibulatkan 154,900.00
A.04.05.1 1 M2 PASANG BEKISTING UNTUK BALOK 2 x PAKAI (NON EXPOSED)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0090 m³ 2,200,000.00 19,800.00
Kaso Bahan Kayu Perancah 0.0200 m³ 1,750,000.00 35,000.00
Jumlah Bahan 100,700.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 154,655.00
Keuntungan Max. 10 % 15,465.50
Jumlah Total 170,120.50
Dibulatkan 170,100.00
Page 38

1 2 3 4 5 6=(3x5)
A.04.05.2 1 M2 PASANG BEKISTING UNTUK BALOK 2 x PAKAI (EXPOSED)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0090 m³ 2,200,000.00 19,800.00
Triplek 4 mm 0.3500 lbr 60,000.00 21,000.00
Kaso Bahan Kayu Perancah 0.0200 m³ 1,750,000.00 35,000.00
Jumlah Bahan 121,700.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 175,655.00
Keuntungan Max. 10 % 17,565.50
Jumlah Total 193,220.50
Dibulatkan 193,200.00
A.04.06.1 1 M2 PASANG BEKISTING UNTUK LANTAI 2 x PAKAI (NON EXPOSED)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0075 m³ 2,200,000.00 16,500.00
Kaso Bahan Kayu Perancah 0.0600 m³ 1,750,000.00 105,000.00
Jumlah Bahan 167,400.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 221,355.00
Keuntungan Max. 10 % 22,135.50
Jumlah Total 243,490.50
Dibulatkan 243,400.00
A.04.06.2 1 M2 PASANG BEKISTING UNTUK LANTAI 2 x PAKAI ( EXPOSED)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0200 m³ 1,900,000.00 38,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0075 m³ 2,200,000.00 16,500.00
Triplek 4 mm 0.1750 lbr 120,000.00 21,000.00
Dolken Kayu Galam Ø - 8 - 10 / 4 m 0.0600 btg 1,750,000.00 105,000.00
Jumlah Bahan 188,400.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 242,355.00
Keuntungan Max. 10 % 24,235.50
Jumlah Total 266,590.50
Dibulatkan 266,500.00
Page 39

1 2 3 4 5 6=(3x5)
A.04.07 1 M2 PASANG BEKISTING UNTUK DINDING
BAHAN :
Kayu Terentang Albasiah, Papan 0.0300 m³ 1,900,000.00 57,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 3,500.00 700.00
Balok Kayu Lokal Klas II 0.0200 m³ 2,200,000.00 44,000.00
Multiplek t = 9 mm 0.3500 lbr 120,000.00 42,000.00
Dolken Kayu Galam Ø - 8 - 10 / 4 m 3.0000 btg 75,000.00 225,000.00
Jumlah Bahan 375,900.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 429,855.00
Keuntungan Max. 10 % 42,985.50
Jumlah Total 472,840.50
Dibulatkan 472,800.00
A.04.08 1 M2 PASANG BEKISTING UNTUK TANGGA
BAHAN :
Kayu Terentang Albasiah, Papan 0.0300 m³ 1,900,000.00 57,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.1500 ltr 3,500.00 525.00
Balok Kayu Lokal Klas II 0.0015 m³ 2,200,000.00 3,300.00
Multiplek t = 9 mm 0.3500 lbr 120,000.00 42,000.00
Dolken Kayu Galam Ø - 8 - 10 / 4 m 2.0000 btg 75,000.00 150,000.00
Jumlah Bahan 260,025.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 313,980.00
Keuntungan Max. 10 % 31,398.00
Jumlah Total 345,378.00
Dibulatkan 345,300.00
A.04.08.1 1 M2 PASANG BEKISTING UNTUK TANGGA
BAHAN :
Kayu Terentang Albasiah, Papan 0.0300 m³ 1,900,000.00 57,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.1500 ltr 3,500.00 525.00
Balok Kayu Lokal Klas II 0.0015 m³ 2,200,000.00 3,300.00
Kaso Bahan Kayu Perancah 0.0200 m³ 1,750,000.00 35,000.00
Jumlah Bahan 103,025.00
UPAH :
Pekerja 0.6600 Oh 45,000.00 29,700.00
Tukang Kayu 0.3300 Oh 60,000.00 19,800.00
Kepala Tukang 0.0330 Oh 65,000.00 2,145.00
Mandor 0.0330 Oh 70,000.00 2,310.00
Jumlah Pekerja 53,955.00
Jumlah Bahan + Pekerja 156,980.00
Keuntungan Max. 10 % 15,698.00
Jumlah Total 172,678.00
Dibulatkan 172,600.00
Page 40

1 2 3 4 5 6=(3x5)
A.04.10.0 1 M3 MEMBUAT BETON DENGAN MUTU K 175
BAHAN :
Semen Portland 232.0000 kg 1,360.00 315,520.00
Pasir Beton 0.5400 m³ 135,000.00 72,900.00
Batu Pecah Mesin 2/3 0.8100 m³ 175,000.00 141,750.00
Jumlah Bahan 530,170.00
UPAH :
Pekerja 6.0000 Oh 45,000.00 270,000.00
Tukang Batu 1.0000 Oh 60,000.00 60,000.00
Kepala Tukang 0.1000 Oh 65,000.00 6,500.00
Mandor 0.3000 Oh 70,000.00 21,000.00
Jumlah Pekerja 357,500.00
Jumlah Bahan + Pekerja 887,670.00
Keuntungan Max. 10 % 88,767.00
Jumlah Total 976,437.00
Dibulatkan 976,400.00
A.04.10 1 M3 MEMBUAT BETON DENGAN MUTU K 225
BAHAN :
Semen Portland 388.0000 kg 1,360.00 527,680.00
Pasir Beton 0.6500 m³ 135,000.00 87,750.00
Batu Pecah Mesin 2/3 0.6500 m³ 175,000.00 113,750.00
Jumlah Bahan 729,180.00
UPAH :
Pekerja 6.0000 Oh 45,000.00 270,000.00
Tukang Batu 1.0000 Oh 60,000.00 60,000.00
Kepala Tukang 0.1000 Oh 65,000.00 6,500.00
Mandor 0.3000 Oh 70,000.00 21,000.00
Jumlah Pekerja 357,500.00
Jumlah Bahan + Pekerja 1,086,680.00
Keuntungan Max. 10 % 108,668.00
Jumlah Total 1,195,348.00
Dibulatkan 1,195,300.00
A.04.14 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen Portland 218.0000 kg 1,360.00 296,480.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.8700 m³ 175,000.00 152,250.00
Jumlah Bahan 518,930.00
UPAH :
Pekerja 1.6500 Oh 45,000.00 74,250.00
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Kepala Tukang 0.0250 Oh 65,000.00 1,625.00
Mandor 0.0800 Oh 70,000.00 5,600.00
Jumlah Pekerja 96,475.00
Jumlah Bahan + Pekerja 615,405.00
Keuntungan Max. 10 % 61,540.50
Jumlah Total 676,945.50
Dibulatkan 676,900.00
A.04.PB1 1 M3PEKERJAAN PONDASI BETON (PB1)
BAHAN :
Pek. Besi Beton U 24 kg 14,400.00 -
Pek. Besi Beton U 32/39 88.1610 kg 14,400.00 1,269,518.40
Pek. Bekisting (2 x pakai) 1.1750 m2 94,800.00 111,390.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 2,576,208.40
Dibulatkan 2,576,200.00
Page 41

1 2 3 4 5 6=(3x5)
A.04.PB2 1 M3PEKERJAAN PONDASI BETON (PB2)
BAHAN :
Pek. Besi Beton U 24 - kg 14,400.00 -
Pek. Besi Beton U 32/39 163.1200 kg 14,400.00 2,348,928.00
Pek. Bekisting (2 x pakai) 3.4000 m2 94,800.00 322,320.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,866,548.00
Dibulatkan 3,866,500.00
A.04.SL1 1 M3PEKERJAAN SLOOF SL1 20 X 35
BAHAN :
Pek. Besi Beton U 24 30.8570 kg 14,400.00 444,340.80
Pek. Besi Beton U 32/39 150.0000 kg 14,400.00 2,160,000.00
Pek. Bekisting (2 x pakai) 3.4000 m2 100,100.00 340,340.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,139,980.80
Dibulatkan 4,139,900.00
A.04.SL2 1 M3PEKERJAAN SLOOF SL2 20 X 30
BAHAN :
Pek. Besi Beton U 24 32.0000 kg 14,400.00 460,800.00
Pek. Besi Beton U 32/39 87.5000 kg 14,400.00 1,260,000.00
Pek. Bekisting (2 x pakai) 3.4000 m2 100,100.00 340,340.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,256,440.00
Dibulatkan 3,256,400.00
A.04.SL3 1 M3PEKERJAAN SLOOF SL3 15 X 25
BAHAN :
Pek. Besi Beton U 24 40.9600 kg 14,400.00 589,824.00
Pek. Besi Beton U 32/39 112.0000 kg 14,400.00 1,612,800.00
Pek. Bekisting (2 x pakai) 3.4000 m2 100,100.00 340,340.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,738,264.00
Dibulatkan 3,738,200.00
A.04.KB1A 1 M3PEKERJAAN KOLOM BAWAH (KB1A) 30 X 30
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 115.9000 kg 14,400.00 1,668,960.00
Pek. Bekisting (2 x pakai) 6.6670 m2 154,900.00 1,032,718.30
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,339,346.30
Dibulatkan 4,339,300.00
A.04.KB1B 1 M3PEKERJAAN KOLOM BAWAH (KB1B) 25 X 25
BAHAN :
Pek. Besi Beton U 24 42.3400 kg 14,400.00 609,696.00
Pek. Besi Beton U 32/39 166.9000 kg 14,400.00 2,403,360.00
Pek. Bekisting (2 x pakai) 13.2000 m2 154,900.00 2,044,680.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 6,253,036.00
Dibulatkan 6,253,000.00
Page 42

1 2 3 4 5 6=(3x5)
A.04.KB2 1 M3PEKERJAAN KOLOM BAWAH (KB2) 13 X 13
BAHAN :
Pek. Besi Beton U 24 186.8900 kg 14,400.00 2,691,216.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 7.6900 m2 154,900.00 1,191,181.00
Pek. Beton K.175 1.0000 m3 976,400.00 976,400.00
Jumlah Total 4,858,797.00
Dibulatkan 4,858,700.00
A.04.KB3 1 M3PEKERJAAN KOLOM BAWAH (KB3) 23 X 65
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 118.7900 kg 14,400.00 1,710,576.00
Pek. Bekisting (2 x pakai) 9.2300 m2 154,900.00 1,429,727.00
Pek. Beton K.175 1.0000 m3 976,400.00 976,400.00
Jumlah Total 4,559,071.00
Dibulatkan 4,559,000.00
A.04.KB4 1 M3PEKERJAAN KOLOM BAWAH (KB4) 25 X 25
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 83.4500 kg 14,400.00 1,201,680.00
Pek. Bekisting (2 x pakai) 8.0000 m2 154,900.00 1,239,200.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,078,548.00
Dibulatkan 4,078,500.00
A.04.KA1 1 M3PEKERJAAN KOLOM ATAS (KA1) 25 X 25
BAHAN :
Pek. Besi Beton U 24 42.8800 kg 14,400.00 617,472.00
Pek. Besi Beton U 32/39 115.6600 kg 14,400.00 1,665,504.00
Pek. Bekisting (2 x pakai) 8.0000 m2 154,900.00 1,239,200.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,717,476.00
Dibulatkan 4,717,400.00
A.04.KA2 1 M3PEKERJAAN KOLOM ATAS (KA2) 20 X 20
BAHAN :
Pek. Besi Beton U 24 40.3200 kg 14,400.00 580,608.00
Pek. Besi Beton U 32/39 105.0000 kg 14,400.00 1,512,000.00
Pek. Bekisting (2 x pakai) 10.0000 m2 154,900.00 1,549,000.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,836,908.00
Dibulatkan 4,836,900.00
A.04.KA3 1 M3PEKERJAAN KOLOM ATAS (KA3) 13 X 13
BAHAN :
Pek. Besi Beton U 24 186.8900 kg 14,400.00 2,691,216.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 7.6900 m2 154,900.00 1,191,181.00
Pek. Beton K.175 1.0000 m3 1,208,900.00 1,208,900.00
Jumlah Total 5,091,297.00
Dibulatkan 5,091,200.00
Page 43

1 2 3 4 5 6=(3x5)
A.04.KA4 1 M3PEKERJAAN KOLOM ATAS (KA4) 23 X 65
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 118.7900 kg 14,400.00 1,710,576.00
Pek. Bekisting (2 x pakai) 9.2300 m2 154,900.00 1,429,727.00
Pek. Beton K.175 1.0000 m3 1,208,900.00 1,208,900.00
Jumlah Total 4,791,571.00
Dibulatkan 4,791,500.00
A.04.KA4 1 M3PEKERJAAN KOLOM ATAS (KA4) 25 X 25
BAHAN :
Pek. Besi Beton U 24 30.7200 kg 14,400.00 442,368.00
Pek. Besi Beton U 32/39 83.4500 kg 14,400.00 1,201,680.00
Pek. Bekisting (2 x pakai) 16.0000 m2 154,900.00 2,478,400.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,317,748.00
Dibulatkan 5,317,700.00
A.04.BL1 1 M3PEKERJAAN BALOK LANTAI 25 X 50 (BL1)
BAHAN :
Pek. Besi Beton U 24 41.1600 kg 14,400.00 592,704.00
Pek. Besi Beton U 32/39 95.4240 kg 14,400.00 1,374,105.60
Pek. Bekisting (2 x pakai) 4.0000 m2 170,100.00 680,400.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,842,509.60
Dibulatkan 3,842,500.00
A.04.BL2 1 M3PEKERJAAN BALOK LANTAI 20 X 40 (BL2)
BAHAN :
Pek. Besi Beton U 24 54.8630 kg 14,400.00 790,027.20
Pek. Besi Beton U 32/39 105.0000 kg 14,400.00 1,512,000.00
Pek. Bekisting (2 x pakai) 4.7500 m2 170,100.00 807,975.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,305,302.20
Dibulatkan 4,305,300.00
A.04.BL3 1 M3PEKERJAAN BALOK LANTAI 20 X 35 (BL3)
BAHAN :
Pek. Besi Beton U 24 32.4000 kg 14,400.00 466,560.00
Pek. Besi Beton U 32/39 120.0000 kg 14,400.00 1,728,000.00
Pek. Bekisting (2 x pakai) 9.7143 m2 170,100.00 1,652,402.43
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,042,262.43
Dibulatkan 5,042,200.00
Page 44

1 2 3 4 5 6=(3x5)
A.04.BL4 1 M3PEKERJAAN BALOK LANTAI 20 X 30 (BL4)
BAHAN :
Pek. Besi Beton U 24 33.6000 kg 14,400.00 483,840.00
Pek. Besi Beton U 32/39 87.5000 kg 14,400.00 1,260,000.00
Pek. Bekisting (2 x pakai) 5.6670 m2 170,100.00 963,956.70
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 3,903,096.70
Dibulatkan 3,903,000.00
A.04.BL5 1 M3PEKERJAAN BALOK LANTAI 15 X 25 (BL5)
BAHAN :
Pek. Besi Beton U 24 43.0080 kg 14,400.00 619,315.20
Pek. Besi Beton U 32/39 112.0000 kg 14,400.00 1,612,800.00
Pek. Bekisting (2 x pakai) 5.4667 m2 170,100.00 929,885.67
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,357,300.87
Dibulatkan 4,357,300.00
A.04.B1 1 M3PEKERJAAN BALOK 13 x 13 ( B1)
BAHAN :
Pek. Besi Beton U 24 186.8900 kg 14,400.00 2,691,216.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 7.6900 m2 170,100.00 1,308,069.00
Pek. Beton K.225 1.0000 m3 976,400.00 976,400.00
Jumlah Total 4,975,685.00
Dibulatkan 4,975,600.00
A.04.B2 1 M3PEKERJAAN BALOK 15 x 25 ( B2)
BAHAN :
Pek. Besi Beton U 24 33.6000 kg 14,400.00 483,840.00
Pek. Besi Beton U 32/39 186.3200 kg 14,400.00 2,683,008.00
Pek. Bekisting (2 x pakai) 6.6700 m2 170,100.00 1,134,567.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,496,715.00
Dibulatkan 5,496,700.00
A.04.B3 1 M3PEKERJAAN BALOK 15 x 20 ( B3)
BAHAN :
Pek. Besi Beton U 24 38.2400 kg 14,400.00 550,656.00
Pek. Besi Beton U 32/39 192.3500 kg 14,400.00 2,769,840.00
Pek. Bekisting (2 x pakai) 8.8890 m2 170,100.00 1,512,018.90
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 6,027,814.90
Dibulatkan 6,027,800.00
A.04.RB1 1 M3PEKERJAAN RING BALOK 20 x 30 ( RB1)
BAHAN :
Pek. Besi Beton U 24 171.6400 kg 14,400.00 2,471,616.00
Pek. Besi Beton U 32/39 87.5000 kg 14,400.00 1,260,000.00
Pek. Bekisting (2 x pakai) 13.3300 m2 170,100.00 2,267,433.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 7,194,349.00
Dibulatkan 7,194,300.00
Page 45

1 2 3 4 5 6=(3x5)
A.04.RB2 1 M3PEKERJAAN RING BALOK 15 x 25 ( RB2)
BAHAN :
Pek. Besi Beton U 24 43.0080 kg 14,400.00 619,315.20
Pek. Besi Beton U 32/39 112.0000 kg 14,400.00 1,612,800.00
Pek. Bekisting (2 x pakai) 13.3300 m2 170,100.00 2,267,433.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,694,848.20
Dibulatkan 5,694,800.00
A.04.B4 1 M3PEKERJAAN BALOK 20 X 30 (B4)
BAHAN :
Pek. Besi Beton U 24 33.6000 kg 14,400.00 483,840.00
Pek. Besi Beton U 32/39 87.5000 kg 14,400.00 1,260,000.00
Pek. Bekisting (2 x pakai) 13.3300 m2 170,100.00 2,267,433.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,206,573.00
Dibulatkan 5,206,500.00
A.04.PLT12 1 M3PEKERJAAN LANTAI T=12 CM
BAHAN :
Pek. Besi Beton U 24 130.2000 kg 14,400.00 1,874,880.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 8.3330 m2 243,400.00 2,028,252.20
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,098,432.20
Dibulatkan 5,098,400.00
A.04.PLT10 1 M3PEKERJAAN LANTAI T=10 CM
BAHAN :
Pek. Besi Beton U 24 117.1800 kg 14,400.00 1,687,392.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 10.0000 m2 243,400.00 2,434,000.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 5,316,692.00
Dibulatkan 5,316,600.00
A.04.PLT8 1 M3PEKERJAAN LANTAI T=8 CM
BAHAN :
Pek. Besi Beton U 24 94.5000 kg 14,400.00 1,360,800.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 6.6700 m2 243,400.00 1,623,478.00
Pek. Beton K.225 1.0000 m3 1,195,300.00 1,195,300.00
Jumlah Total 4,179,578.00
Dibulatkan 4,179,500.00
A.04.PLT7 1 M3PEKERJAAN LANTAI T=7 CM
BAHAN :
Pek. Besi Beton U 24 94.5000 kg 14,400.00 1,360,800.00
Pek. Besi Beton U 32/39 - kg 14,400.00 -
Pek. Bekisting (2 x pakai) 7.1400 m2 243,400.00 1,737,876.00
Pek. Beton K.225 1.0000 m3 976,400.00 976,400.00
Jumlah Total 4,075,076.00
Dibulatkan 4,075,000.00
Page 46

1 2 3 4 5 6=(3x5)
A.04.17 1 M3 MEMBUAT PONDASI BETON BERTULANG (157.5000 kg BESI + BEKISTNG)
BAHAN :
Kayu Terentang Albasiah, Papan 0.2000 m³ 1,900,000.00 380,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 1.5000 kg 18,000.00 27,000.00
Minyak Bekisting 0.4000 ltr 3,500.00 1,400.00
Besi Beton Polos 157.5000 kg 11,500.00 1,811,250.00
Kawat Beton 2.3000 kg 18,000.00 41,400.00
Semen Portland 336.0000 kg 1,360.00 456,960.00
Pasir Beton 0.5400 m³ 135,000.00 72,900.00
Batu Pecah Mesin 2/3 0.8100 m³ 175,000.00 141,750.00
Jumlah Bahan 2,932,660.00
UPAH :
Pekerja 5.3000 Oh 45,000.00 238,500.00
Tukang Batu 0.2750 Oh 60,000.00 16,500.00
Tukang Kayu 1.3000 Oh 60,000.00 78,000.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2620 Oh 65,000.00 17,030.00
Mandor 0.2650 Oh 70,000.00 18,550.00
Jumlah Pekerja 431,580.00
Jumlah Bahan + Pekerja 3,364,240.00
Keuntungan Max. 10 % 336,424.00
Jumlah Total 3,700,664.00
Dibulatkan 3,700,600.00
A.04.17 P1 1 M3 MEMBUAT PONDASI BETON BERTULANG 1,25 x 1,25 TULANGAN DIA 12 (111,7437 kg BESI + BEKISTNG)

BAHAN :
Kayu Terentang Albasiah, Papan 0.1025 m³ 1,900,000.00 194,713.92
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 1.5000 kg 18,000.00 27,000.00
Minyak Bekisting 0.4000 ltr 3,500.00 1,400.00
Besi Beton Polos 111.7437 kg 11,500.00 1,285,052.12
Kawat Beton 2.3000 kg 18,000.00 41,400.00
Semen Portland 336.0000 kg 1,360.00 456,960.00
Pasir Beton 0.5400 m³ 135,000.00 72,900.00
Batu Pecah Mesin 2/3 0.8100 m³ 175,000.00 141,750.00
Jumlah Bahan 2,221,176.05
UPAH :
Pekerja 5.3000 Oh 45,000.00 238,500.00
Tukang Batu 0.2750 Oh 60,000.00 16,500.00
Tukang Kayu 1.3000 Oh 60,000.00 78,000.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2620 Oh 65,000.00 17,030.00
Mandor 0.2650 Oh 70,000.00 18,550.00
Jumlah Pekerja 431,580.00
Jumlah Bahan + Pekerja 2,652,756.05
Keuntungan Max. 10 % 265,275.60
Jumlah Total 2,918,031.65
Dibulatkan 2,918,000.00
Page 47

1 2 3 4 5 6=(3x5)
A.04.17 P2 1 M3 MEMBUAT PONDASI BETON BERTULANG 0,80 X 0,80 TULANGAN DIA 12 (126,2854 kg BESI + BEKISTNG)

BAHAN :
Kayu Terentang Albasiah, Papan 0.2000 m³ 1,900,000.00 380,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 1.5000 kg 18,000.00 27,000.00
Minyak Bekisting 0.4000 ltr 3,500.00 1,400.00
Besi Beton Polos 95.4665 kg 11,500.00 1,097,864.35
Kawat Beton 2.3000 kg 18,000.00 41,400.00
Semen Portland 336.0000 kg 1,360.00 456,960.00
Pasir Beton 0.5400 m³ 135,000.00 72,900.00
Batu Pecah Mesin 2/3 0.8100 m³ 175,000.00 141,750.00
Jumlah Bahan 2,219,274.35
UPAH :
Pekerja 5.3000 Oh 45,000.00 238,500.00
Tukang Batu 0.2750 Oh 60,000.00 16,500.00
Tukang Kayu 1.3000 Oh 60,000.00 78,000.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2620 Oh 65,000.00 17,030.00
Mandor 0.2650 Oh 70,000.00 18,550.00
Jumlah Pekerja 431,580.00
Jumlah Bahan + Pekerja 2,650,854.35
Keuntungan Max. 10 % 265,085.43
Jumlah Total 2,915,939.78
Dibulatkan 2,915,900.00
A.04.18 1 M3 MEMBUAT SLOOF 10/15 (204.4000 Kg Besi + Bekisting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekisting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.0000 kg 18,000.00 108,000.00
Minyak Bekisting 2.0000 ltr 3,500.00 7,000.00
Besi Beton Polos U 24 204.4000 kg 11,500.00 2,350,600.00
Kawat Beton 3.0700 kg 18,000.00 55,260.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,926,840.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,232,740.00
Keuntungan Max. 10 % 423,274.00
Jumlah 4,656,014.00
Dibulatkan 4,656,000.00
Page 48

1 2 3 4 5 6=(3x5)
A.04.19 1 M3 MEMBUAT SLOOF 12/15 (172.9000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekisting Albasiah 0.3300 m³ 1,900,000.00 627,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.0000 kg 18,000.00 90,000.00
Minyak Bekisting 1.6700 ltr 3,500.00 5,845.00
Besi Beton Polos U 24 172.9000 kg 11,500.00 1,988,350.00
Kawat Beton 2.5900 kg 18,000.00 46,620.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,403,795.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,709,695.00
Keuntungan Max. 10 % 370,969.50
Jumlah 4,080,664.50
Dibulatkan 4,080,660.00
A.04.20 1 M3 MEMBUAT SLOOF 12/15 (259,0000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekisting Albasiah 0.3300 m³ 1,900,000.00 627,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.0000 kg 18,000.00 90,000.00
Minyak Bekisting 1.6700 ltr 3,500.00 5,845.00
Besi Beton Polos U 24 259.0000 kg 11,500.00 2,978,500.00
Kawat Beton 3.8900 kg 18,000.00 70,020.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,417,345.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,723,245.00
Keuntungan Max. 10 % 472,324.50
Jumlah 5,195,569.50
Dibulatkan 5,195,500.00
Page 49

1 2 3 4 5 6=(3x5)
A.04.21 1 M3 MEMBUAT SLOOF 15/20 (117.6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekisting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.0000 kg 18,000.00 72,000.00
Minyak Bekisting 1.3300 ltr 3,500.00 4,655.00
Besi Beton Polos U 24 117.6000 kg 11,500.00 1,352,400.00
Kawat Beton 1.7600 kg 18,000.00 31,680.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,619,715.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,925,615.00
Keuntungan Max. 10 % 292,561.50
Jumlah 3,218,176.50
Dibulatkan 3,218,100.00
A.04.22 1 M3 MEMBUAT SLOOF 15/20 (180,6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekisting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.0000 kg 18,000.00 72,000.00
Minyak Bekisting 1.3300 ltr 3,500.00 4,655.00
Besi Beton Polos U 24 180.6000 kg 11,500.00 2,076,900.00
Kawat Beton 2.7100 kg 18,000.00 48,780.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,361,315.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,667,215.00
Keuntungan Max. 10 % 366,721.50
Jumlah 4,033,936.50
Dibulatkan 4,033,900.00
Page 50

1 2 3 4 5 6=(3x5)
A.04.22.a 1 M3 MEMBUAT SLOOF 15/20 (146,6843 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekisting Albasiah 0.3067 m³ 1,900,000.00 582,666.67
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.0000 kg 18,000.00 72,000.00
Minyak Bekisting 1.3300 ltr 3,500.00 4,655.00
Besi Beton Polos U 24 146.6843 kg 11,500.00 1,686,869.20
Kawat Beton 2.7100 kg 18,000.00 48,780.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,040,950.87
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,346,850.87
Keuntungan Max. 10 % 334,685.09
Jumlah 3,681,535.96
Dibulatkan 3,681,500.00
A.04.23 1 M3 MEMBUAT SLOOF 25/30 (112.0900 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.1600 m³ 1,900,000.00 304,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 2.4000 kg 18,000.00 43,200.00
Minyak Bekisting 0.8000 ltr 3,500.00 2,800.00
Besi Beton Polos U 24 112.0900 kg 11,500.00 1,289,035.00
Kawat Beton 1.6800 kg 18,000.00 30,240.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,315,255.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,621,155.00
Keuntungan Max. 10 % 262,115.50
Jumlah 2,883,270.50
Dibulatkan 2,883,200.00
Page 51

1 2 3 4 5 6=(3x5)
A.04.24 1 M3 MEMBUAT SLOOF 20/30 (154,0431 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.2000 m³ 1,900,000.00 380,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 3.0000 kg 18,000.00 54,000.00
Minyak Bekisting 1.0000 ltr 3,500.00 3,500.00
Besi Beton Polos U 24 157.0431 kg 11,500.00 1,805,995.57
Kawat Beton 1.8700 kg 18,000.00 33,660.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,923,135.57
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,229,035.57
Keuntungan Max. 10 % 322,903.56
Jumlah 3,551,939.12
Dibulatkan 3,551,900.00
A.04.25 1 M3 MEMBUAT KOLOM 12/12 (211.2900 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3700 m³ 1,900,000.00 703,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.6600 kg 18,000.00 119,880.00
Minyak Bekisting 3.3200 ltr 3,500.00 11,620.00
Besi Beton Polos U 24 211.2900 kg 11,500.00 2,429,835.00
Kawat Beton 3.1700 kg 18,000.00 57,060.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,967,375.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,273,275.00
Keuntungan Max. 10 % 427,327.50
Jumlah 4,700,602.50
Dibulatkan 4,700,600.00
Page 52

1 2 3 4 5 6=(3x5)
A.04.26 1 M3 MEMBUAT KOLOM 12/12 (314.9700 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3700 m³ 1,900,000.00 703,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.6600 kg 18,000.00 119,880.00
Minyak Bekisting 3.3200 ltr 3,500.00 11,620.00
Besi Beton Polos U 24 314.9700 kg 11,500.00 3,622,155.00
Kawat Beton 4.7200 kg 18,000.00 84,960.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 5,187,595.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 5,493,495.00
Keuntungan Max. 10 % 549,349.50
Jumlah 6,042,844.50
Dibulatkan 6,042,800.00
A.04.27 1 M3 MEMBUAT KOLOM 15/15 (141.3800 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3000 m³ 1,900,000.00 570,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 18,000.00 95,940.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 141.3800 kg 11,500.00 1,625,870.00
Kawat Beton 2.1200 kg 18,000.00 38,160.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,985,295.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,291,195.00
Keuntungan Max. 10 % 329,119.50
Jumlah 3,620,314.50
Dibulatkan 3,620,300.00
Page 53

1 2 3 4 5 6=(3x5)
A.04.28 1 M3 MEMBUAT KOLOM 15/15 (223,4100 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3000 m³ 1,900,000.00 570,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 18,000.00 95,940.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 223.4100 kg 11,500.00 2,569,215.00
Kawat Beton 3.3500 kg 18,000.00 60,300.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,950,780.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,256,680.00
Keuntungan Max. 10 % 425,668.00
Jumlah 4,682,348.00
Dibulatkan 4,682,300.00
A.04.28.a 1 M3 MEMBUAT KOLOM 15/15 (200,8625 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.9600 m³ 1,900,000.00 1,824,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 18,000.00 95,940.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 200.8625 kg 11,500.00 2,309,918.25
Kawat Beton 3.3500 kg 18,000.00 60,300.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,945,483.25
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 5,251,383.25
Keuntungan Max. 10 % 525,138.33
Jumlah 5,776,521.58
Dibulatkan 5,776,500.00
Page 54

1 2 3 4 5 6=(3x5)
A.04.29 1 M3 MEMBUAT KOLOM 15/20 (117.5900 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4600 m³ 1,900,000.00 874,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6600 ltr 3,500.00 16,310.00
Besi Beton Polos U 24 117.5900 kg 11,500.00 1,352,285.00
Kawat Beton 1.6800 kg 18,000.00 30,240.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,086,755.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,392,655.00
Keuntungan Max. 10 % 339,265.50
Jumlah 3,731,920.50
Dibulatkan 3,731,900.00
A.04.30 1 M3 MEMBUAT KOLOM 15/20 (180,5700 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4600 m³ 1,900,000.00 874,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6600 ltr 3,500.00 16,310.00
Besi Beton Polos U 24 180.5700 kg 11,500.00 2,076,555.00
Kawat Beton 2.7000 kg 18,000.00 48,600.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,829,385.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,135,285.00
Keuntungan Max. 10 % 413,528.50
Jumlah 4,548,813.50
Dibulatkan 4,548,800.00
Page 55

1 2 3 4 5 6=(3x5)
A.04.30.a 1 M3 MEMBUAT KOLOM 15/20 (157,3757 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.8200 m³ 1,900,000.00 1,558,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6600 ltr 3,500.00 16,310.00
Besi Beton Polos U 24 157.3757 kg 11,500.00 1,809,820.00
Kawat Beton 2.7000 kg 18,000.00 48,600.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,246,650.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,552,550.00
Keuntungan Max. 10 % 455,255.00
Jumlah 5,007,805.00
Dibulatkan 5,007,800.00
A.04.30.K4 1 M3 MEMBUAT KOLOM 15/20 (182,5451 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4025 m³ 1,900,000.00 764,788.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6600 ltr 3,500.00 16,310.00
Besi Beton Polos U 24 42.5451 kg 11,500.00 489,268.13
Besi Beton Polos U 39 140.0000 kg 18,000.00 2,520,000.00
Kawat Beton 2.7000 kg 18,000.00 48,600.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,652,886.13
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,958,786.13
Keuntungan Max. 10 % 495,878.61
Jumlah 5,454,664.75
Dibulatkan 5,454,600.00
Page 56

1 2 3 4 5 6=(3x5)
A.04.31 1 M3 MEMBUAT KOLOM 15/30 (132,4000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 132.4000 kg 11,500.00 1,522,600.00
Kawat Beton 1.9900 kg 18,000.00 35,820.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,122,400.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,428,300.00
Keuntungan Max. 10 % 342,830.00
Jumlah 3,771,130.00
Dibulatkan 3,771,100.00
A.04.32 1 M3 MEMBUAT KOLOM 20/20 (92.0500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 92.0500 kg 11,500.00 1,058,575.00
Kawat Beton 1.3800 kg 18,000.00 24,840.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,647,395.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,953,295.00
Keuntungan Max. 10 % 295,329.50
Jumlah 3,248,624.50
Dibulatkan 3,248,600.00
Page 57

1 2 3 4 5 6=(3x5)
A.04.33 1 M3 MEMBUAT KOLOM 20/20 (142,4500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 142.4500 kg 11,500.00 1,638,175.00
Kawat Beton 2.1400 kg 18,000.00 38,520.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,240,675.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,546,575.00
Keuntungan Max. 10 % 354,657.50
Jumlah 3,901,232.50
Dibulatkan 3,901,200.00
A.04.33.K3 1 M3 MEMBUAT KOLOM 20/20 (128,6492 Kg Besi + Bekesting)
DENGAN TULANGAN 5 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2447 m³ 1,900,000.00 464,835.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 36.2492 kg 11,500.00 416,865.23
Besi Beton Polos U 32/39 92.4000 kg 18,000.00 1,663,200.00
Kawat Beton 2.1400 kg 18,000.00 38,520.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,387,400.23
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,693,300.23
Keuntungan Max. 10 % 369,330.02
Jumlah 4,062,630.25
Dibulatkan 4,062,600.00
Page 58

1 2 3 4 5 6=(3x5)
A.04.34 1 M3 MEMBUAT KOLOM 25/25 (100.1300 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3200 m³ 1,900,000.00 608,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.4000 kg 18,000.00 115,200.00
Minyak Bekisting 3.2000 ltr 3,500.00 11,200.00
Besi Beton Polos U 24 100.1300 kg 11,500.00 1,151,495.00
Kawat Beton 1.5000 kg 18,000.00 27,000.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,558,875.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,864,775.00
Keuntungan Max. 10 % 286,477.50
Jumlah 3,151,252.50
Dibulatkan 3,151,200.00
A.04.35 1 M3 MEMBUAT KOLOM 30/30 (171,6700 Kg Besi + Bekesting)
DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 18,000.00 95,940.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 171.6700 kg 11,500.00 1,974,205.00
Kawat Beton 1.6200 kg 18,000.00 29,160.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,267,630.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,573,530.00
Keuntungan Max. 10 % 357,353.00
Jumlah 3,930,883.00
Dibulatkan 3,930,800.00
Page 59

1 2 3 4 5 6=(3x5)
A.04.36 1 M3 MEMBUAT KOLOM 25/40 (166,3200 Kg Besi + Bekesting)
DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2600 m³ 1,900,000.00 494,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.2000 kg 18,000.00 93,600.00
Minyak Bekisting 2.6000 ltr 3,500.00 9,100.00
Besi Beton Polos U 24 176.3520 kg 11,500.00 2,028,048.00
Kawat Beton 2.4900 kg 18,000.00 44,820.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,315,548.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,621,448.00
Keuntungan Max. 10 % 362,144.80
Jumlah 3,983,592.80
Dibulatkan 3,983,500.00
A.04.34.K1 1 M3 MEMBUAT KOLOM 25/35 (195,0636 Kg Besi + Bekesting)
DENGAN TULANGAN 12 BATANG DIA 13 BEUGEL DIA 8 JARAK 10 - 20 CM
BAHAN :
Bekesting Albasiah 0.4320 m³ 1,900,000.00 820,800.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 161.2200 kg 11,500.00 1,854,030.00
Besi Beton Polos U 24 33.8436 kg 11,500.00 389,201.40
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 1/2 & 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,348,417.00
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,707,842.00
Keuntungan Max. 10 % 370,784.20
Jumlah 4,078,626.20
Dibulatkan 4,078,620.00
Page 60

1 2 3 4 5 6=(3x5)
A.04.34.K2 1 M3 MEMBUAT KOLOM 25/30 (1158,7784 Kg Besi + Bekesting)
DENGAN TULANGAN 8 BATANG DIA 13 BEUGEL DIA 8 JARAK 10 - 20 CM
BAHAN :
Bekesting Albasiah 0.4640 m³ 1,900,000.00 881,600.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 124.1800 kg 11,500.00 1,428,070.00
Besi Beton Polos U 24 34.5984 kg 11,500.00 397,882.12
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 1/2 & 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,991,937.72
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,351,362.72
Keuntungan Max. 10 % 335,136.27
Jumlah 3,686,498.99
Dibulatkan 3,686,490.00
A.04.34.K3. 1 M3 MEMBUAT KOLOM 25/25 (184.34000 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 16 BEUGEL DIA 8 JARAK 10 - 20 CM
BAHAN :
Bekesting Albasiah 0.5088 m³ 1,900,000.00 966,720.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 149.7600 kg 11,500.00 1,722,240.00
Besi Beton Polos U 24 34.5830 kg 11,500.00 397,704.96
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 1/2 & 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,371,050.56
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,730,475.56
Keuntungan Max. 10 % 373,047.56
Jumlah 4,103,523.12
Dibulatkan 4,103,520.00
Page 61

1 2 3 4 5 6=(3x5)
A.04.46 ( B1 ) 1 M3 MEMBUAT BALOK 25/50 (177,1095 Kg Besi + Bekesting)
DENGAN TULANGAN 10 BATANG DIA 16 DAN 2 BATANG DIA 12 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.3144 m³ 1,900,000.00 597,360.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 147.0269 kg 11,500.00 1,690,809.12
Besi Beton Polos U 24 38.7536 kg 11,500.00 445,666.76
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 3,306,471.48
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,665,896.48
Keuntungan Max. 10 % 366,589.65
Jumlah 4,032,486.12
Dibulatkan 4,032,480.00
A.04.46 ( B2 ) 1 M3 MEMBUAT BALOK 25/50 (148,2245 Kg Besi + Bekesting)
DENGAN TULANGAN 8 BATANG DIA 16 DAN 2 BATANG DIA 12 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.3144 m³ 1,900,000.00 597,360.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 124.8000 kg 11,500.00 1,435,200.00
Besi Beton Polos U 24 33.0000 kg 11,500.00 379,500.00
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 2,984,695.60
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,344,120.60
Keuntungan Max. 10 % 334,412.06
Jumlah 3,678,532.66
Dibulatkan 3,678,530.00
Page 62

1 2 3 4 5 6=(3x5)
A.04.46 ( B3 ) 1 M3 MEMBUAT BALOK 20/30 (171,8035 Kg Besi + Bekesting) B4
DENGAN TULANGAN 5 BATANG DIA 16 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.4300 m³ 1,900,000.00 817,000.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton U 39 100.0000 kg 11,500.00 1,150,000.00
Besi Beton Polos U 24 50.3067 kg 11,500.00 578,526.67
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 3,118,162.27
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,477,587.27
Keuntungan Max. 10 % 347,758.73
Jumlah 3,825,345.99
Dibulatkan 3,825,340.00
A.04.46 ( B4 ) 1 M3 MEMBUAT BALOK 20/30 (174.1376 Kg Besi + Bekesting) B4
DENGAN TULANGAN 5 BATANG DIA 12 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.4300 m³ 1,900,000.00 817,000.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton Polos U 24 166.2223 kg 11,500.00 1,911,556.22
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 3,301,191.82
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,660,616.82
Keuntungan Max. 10 % 366,061.68
Jumlah 4,026,678.50
Dibulatkan 4,026,670.00
Page 63

1 2 3 4 5 6=(3x5)
A.04.46 ( B5 ) 1 M3 MEMBUAT BALOK 15/25 (1139.9916 Kg Besi + Bekesting)
DENGAN TULANGAN 5 BATANG DIA 10 BEUGEL DIA 8 JARAK 10- 20 CM
BAHAN :
Bekesting Albasiah 0.5680 m³ 1,900,000.00 1,079,200.00
Paku 5 - 7 cm 1.5000 kg 18,000.00 27,000.00
Pelumas Bekesting 0.4000 lt 3,500.00 1,400.00
Besi Beton Polos U 24 127.7223 kg 11,500.00 1,468,806.22
Kawat Beton 2.2500 kg 18,000.00 40,500.00
Semen Portland 6.4600 zak 1,360.00 8,785.60
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 1/2 & 2/3 0.7800 m³ 175,000.00 136,500.00
Kayu Balok Albasiah 0.1225 m³ 1,700,000.00 208,250.00
Bambu Ø - 7 - 10 8.0000 btg 10,000.00 80,000.00
Jumlah Bahan 3,120,641.82
UPAH :
Tukang Batu 0.3500 org 45,000.00 15,750.00
Tukang Kayu 1.0400 org 60,000.00 62,400.00
Tukang Besi 1.0500 org 60,000.00 63,000.00
Kepala Tukang 0.2450 org 60,000.00 14,700.00
Pekerja 3.0000 org 65,000.00 195,000.00
Mandor 0.1225 org 70,000.00 8,575.00
Jumlah Pekerja 359,425.00
Jumlah Bahan + Pekerja 3,480,066.82
Keuntungan Max. 10 % 348,006.68
Jumlah 3,828,073.50
Dibulatkan 3,828,070.00
A.04.37 1 M3 MEMBUAT RING BALK 10/15 (204.4000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.5300 m³ 1,900,000.00 1,007,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 10.6700 kg 18,000.00 192,060.00
Minyak Bekisting 5.3300 ltr 3,500.00 18,655.00
Besi Beton Polos U 24 204.4000 kg 11,500.00 2,350,600.00
Kawat Beton 3.0700 kg 18,000.00 55,260.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,269,555.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,575,455.00
Keuntungan Max. 10 % 457,545.50
Jumlah 5,033,000.50
Dibulatkan 5,033,000.00
Page 64

1 2 3 4 5 6=(3x5)
A.04.38 1 M3 MEMBUAT RING BALK 10/15 (280.0000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.5300 m³ 1,900,000.00 1,007,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 10.6700 kg 18,000.00 192,060.00
Minyak Bekisting 5.3300 ltr 3,500.00 18,655.00
Besi Beton Polos U 24 280.0000 kg 11,500.00 3,220,000.00
Kawat Beton 4.2000 kg 18,000.00 75,600.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 5,159,295.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 5,465,195.00
Keuntungan Max. 10 % 546,519.50
Jumlah 6,011,714.50
Dibulatkan 6,011,700.00
A.04.39 1 M3 MEMBUAT RING BALK 12/15 (172.9000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.4700 m³ 1,900,000.00 893,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 9.3300 kg 18,000.00 167,940.00
Minyak Bekisting 4.6700 ltr 3,500.00 16,345.00
Besi Beton Polos U 24 172.9000 kg 11,500.00 1,988,350.00
Kawat Beton 2.5900 kg 18,000.00 46,620.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,758,235.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,064,135.00
Keuntungan Max. 10 % 406,413.50
Jumlah 4,470,548.50
Dibulatkan 4,470,500.00
Page 65

1 2 3 4 5 6=(3x5)
A.04.40 1 M3 MEMBUAT RING BALK 15/15 (141.4000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 141.4000 kg 11,500.00 1,626,100.00
Kawat Beton 2.1200 kg 18,000.00 38,160.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,228,240.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,534,140.00
Keuntungan Max. 10 % 353,414.00
Jumlah 3,887,554.00
Dibulatkan 3,887,500.00
A.04.41 1 M3 MEMBUAT RING BALK 15/15 (212,8000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,900,000.00 760,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 8.0000 kg 18,000.00 144,000.00
Minyak Bekisting 4.0000 ltr 3,500.00 14,000.00
Besi Beton Polos U 24 212.8000 kg 11,500.00 2,447,200.00
Kawat Beton 3.1900 kg 18,000.00 57,420.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 4,068,600.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,374,500.00
Keuntungan Max. 10 % 437,450.00
Jumlah 4,811,950.00
Dibulatkan 4,811,900.00
Page 66

1 2 3 4 5 6=(3x5)
A.04.42 1 M3 MEMBUAT RING BALK 15/20 (117,6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3700 m³ 1,900,000.00 703,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.3300 kg 18,000.00 131,940.00
Minyak Bekisting 3.6700 ltr 3,500.00 12,845.00
Besi Beton Polos U 24 117.6000 kg 11,500.00 1,352,400.00
Kawat Beton 1.7600 kg 18,000.00 31,680.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,877,845.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,183,745.00
Keuntungan Max. 10 % 318,374.50
Jumlah 3,502,119.50
Dibulatkan 3,502,100.00
A.04.43 1 M3 MEMBUAT RING BALK 15/20 (180,6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3700 m³ 1,900,000.00 703,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.3300 kg 18,000.00 131,940.00
Minyak Bekisting 3.6700 ltr 3,500.00 12,845.00
Besi Beton Polos U 24 180.6000 kg 11,500.00 2,076,900.00
Kawat Beton 2.7100 kg 18,000.00 48,780.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,619,445.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,925,345.00
Keuntungan Max. 10 % 392,534.50
Jumlah 4,317,879.50
Dibulatkan 4,317,800.00
Page 67

1 2 3 4 5 6=(3x5)
A.04.43.a 1 M3 MEMBUAT RING BALK 15/20 (157,3757 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.6700 m³ 1,900,000.00 1,273,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.3300 kg 18,000.00 131,940.00
Minyak Bekisting 3.6700 ltr 3,500.00 12,845.00
Besi Beton Polos U 24 157.3757 kg 11,500.00 1,809,820.00
Kawat Beton 2.7100 kg 18,000.00 48,780.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,922,365.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,228,265.00
Keuntungan Max. 10 % 422,826.50
Jumlah 4,651,091.50
Dibulatkan 4,651,000.00
A.04.44 1 M3 MEMBUAT RING BALK 15/25 ( 98.1900 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3500 m³ 1,900,000.00 665,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 18,000.00 124,740.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 98.1900 kg 11,500.00 1,129,185.00
Kawat Beton 1.4700 kg 18,000.00 26,460.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 2,603,510.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 2,909,410.00
Keuntungan Max. 10 % 290,941.00
Jumlah 3,200,351.00
Dibulatkan 3,200,300.00
Page 68

1 2 3 4 5 6=(3x5)
A.04.45 1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3500 m³ 1,900,000.00 665,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 18,000.00 124,740.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 151.9500 kg 11,500.00 1,747,425.00
Kawat Beton 2.2800 kg 18,000.00 41,040.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,236,330.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,542,230.00
Keuntungan Max. 10 % 354,223.00
Jumlah 3,896,453.00
Dibulatkan 3,896,400.00
A.04.45.RB.1 1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.5680 m³ 1,900,000.00 1,079,200.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 18,000.00 124,740.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 127.7223 kg 11,500.00 1,468,806.22
Kawat Beton 2.2800 kg 18,000.00 41,040.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,371,911.22
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 3,677,811.22
Keuntungan Max. 10 % 367,781.12
Jumlah 4,045,592.34
Dibulatkan 4,045,500.00
Page 69

1 2 3 4 5 6=(3x5)
A.04.46 1 M3 MEMBUAT RING BALK 15/25 (201,7900 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3500 m³ 1,900,000.00 665,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 18,000.00 124,740.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 201.7900 kg 11,500.00 2,320,585.00
Kawat Beton 3.03000 kg 18,000.00 54,540.00
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah 2/3 0.7800 m³ 175,000.00 136,500.00
Jumlah Bahan 3,822,990.00
UPAH :
Pekerja 3.0000 Oh 45,000.00 135,000.00
Tukang Batu 0.3500 Oh 60,000.00 21,000.00
Tukang Kayu 1.0400 Oh 60,000.00 62,400.00
Tukang Besi 1.0500 Oh 60,000.00 63,000.00
Kepala Tukang 0.2450 Oh 65,000.00 15,925.00
Mandor 0.1225 Oh 70,000.00 8,575.00
Jumlah Pekerja 305,900.00
Jumlah Bahan + Pekerja 4,128,890.00
Keuntungan Max. 10 % 412,889.00
Jumlah 4,541,779.00
Dibulatkan 4,541,700.00
A.04.47 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.8 JARAK 10 cm TEBAL 6 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 144.5500 kg 11,500.00 1,662,325.00
Kawat Beton 2.1700 kg 18,000.00 39,060.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.5100 kg 18,000.00 135,180.00
Minyak Bekisting 3.7600 ltr 3,500.00 13,160.00
Bekesting Albasiah 0.4100 m³ 1,900,000.00 779,000.00
Jumlah Bahan 3,274,705.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,930,059.67
Keuntungan Max. 10 % 393,005.97
Jumlah Total 4,323,065.64
Dibulatkan 4,323,000.00
Page 70

1 2 3 4 5 6=(3x5)
A.04.48 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 10 cm TEBAL 8 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 108.3700 kg 11,500.00 1,246,255.00
Kawat Beton 1.6300 kg 18,000.00 29,340.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.8600 kg 18,000.00 105,480.00
Minyak Bekisting 2.9300 ltr 3,500.00 10,255.00
Bekisting Albasiah 0.3200 m³ 1,900,000.00 608,000.00
Jumlah Bahan 2,645,310.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,300,664.67
Keuntungan Max. 10 % 330,066.47
Jumlah Total 3,630,731.14
Dibulatkan 3,630,700.00
A.04.48.Lp 1 M3 PEK. LISTPLANG BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 20 cm 8/50 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton u 24 80.9813 kg 11,500.00 931,284.38
Kawat Beton 1.6300 kg 18,000.00 29,340.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.8600 kg 18,000.00 105,480.00
Minyak Bekisting 2.9300 ltr 3,500.00 10,255.00
Bekisting Albasiah 0.3200 m³ 1,900,000.00 608,000.00
Jumlah Bahan 2,330,339.38
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 2,985,694.05
Keuntungan Max. 10 % 298,569.40
Jumlah Total 3,284,263.45
Dibulatkan 3,284,200.00
Page 71

1 2 3 4 5 6=(3x5)
A.04.49 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 134.4500 kg 11,500.00 1,546,175.00
Kawat Beton 2.0200 kg 18,000.00 36,360.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.8800 kg 18,000.00 87,840.00
Minyak Bekisting 2.4400 ltr 3,500.00 8,540.00
Bekisting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Jumlah Bahan 2,837,895.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,493,249.67
Keuntungan Max. 10 % 349,324.97
Jumlah Total 3,842,574.64
Dibulatkan 3,842,500.00
A.04.50 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 192.9900 kg 11,500.00 2,219,385.00
Kawat Beton 2.8900 kg 18,000.00 52,020.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.8800 kg 18,000.00 87,840.00
Minyak Bekisting 2.4400 ltr 3,500.00 8,540.00
Bekisting Albasiah 0.2700 m³ 1,900,000.00 513,000.00
Jumlah Bahan 3,526,765.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 4,182,119.67
Keuntungan Max. 10 % 418,211.97
Jumlah Total 4,600,331.64
Dibulatkan 4,600,300.00
Page 72

1 2 3 4 5 6=(3x5)
A.04.51 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 160.6100 kg 11,500.00 1,847,015.00
Kawat Beton 2.4100 kg 18,000.00 43,380.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.2300 kg 18,000.00 76,140.00
Minyak Bekisting 2.1100 ltr 3,500.00 7,385.00
Bekesting Albasiah 0.2300 m³ 1,900,000.00 437,000.00
Jumlah Bahan 3,056,900.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,712,254.67
Keuntungan Max. 10 % 371,225.47
Jumlah Total 4,083,480.14
Dibulatkan 4,083,400.00
A.04.52 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 15 cm TEBAL 12 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 243.2800 Kg 11,500.00 2,797,720.00
Kawat Beton 3.6500 Kg 18,000.00 65,700.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.2300 kg 18,000.00 76,140.00
Minyak Bekisting 2.1100 ltr 3,500.00 7,385.00
Bekesting Albasiah 0.2300 m³ 1,900,000.00 437,000.00
Jumlah Bahan 4,029,925.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 4,685,279.67
Keuntungan Max. 10 % 468,527.97
Jumlah Total 5,153,807.64
Dibulatkan 5,153,800.00
Page 73

1 2 3 4 5 6=(3x5)
An. PL 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.10 JARAK 15 cm TEBAL 12 cm
BAHAN :
Semen Portland 232.0000 kg 1,360.00 315,520.00
Pasir Beton 0.5200 lbr 135,000.00 70,200.00
Batu Pecah Mesin 1/2 & 2/3 0.7800 M3 175,000.00 136,500.00
Besi Beton Polos U 24 162.51580 Kg 11,500.00 1,868,931.72
Kawat Beton 4.9937 Kg 18,000.00 89,886.62
Kayu Terentang Albasiah, Papan 0.2450 m³ 1,900,000.00 465,500.00
Paku Biasa 2" - 5" 0.1500 kg 18,000.00 2,700.00
Minyak Bekisting 1.4000 Ltr 3,500.00 4,900.00
Kayu Balok Albasiah 0.0700 m³ 1,700,000.00 119,000.00
Jumlah Bahan 3,073,138.33
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,728,493.00
Keuntungan Max. 10 % 372,849.30
Jumlah Total 4,101,342.30
Dibulatkan 4,101,340.00
A.04.53 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 15 cm TEBAL 20 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 152.4400 kg 11,500.00 1,753,060.00
Kawat Beton 2.2300 kg 18,000.00 40,140.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 2.9600 kg 18,000.00 53,280.00
Minyak Bekisting 1.4800 ltr 3,500.00 5,180.00
Bekesting Albasiah 0.1600 m³ 1,900,000.00 304,000.00
Jumlah Bahan 2,801,640.00
UPAH :
Pekerja 6.4697 Oh 45,000.00 291,138.30
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 4.0260 Oh 60,000.00 241,560.00
Tukang Besi 1.0073 Oh 60,000.00 60,438.84
Kepala Tukang 0.5192 Oh 65,000.00 33,746.31
Mandor 0.1924 Oh 70,000.00 13,471.22
Jumlah Pekerja 655,354.67
Jumlah Bahan + Pekerja 3,456,994.67
Keuntungan Max. 10 % 345,699.47
Jumlah Total 3,802,694.14
Dibulatkan 3,802,600.00
Page 74

1 2 3 4 5 6=(3x5)
A.04.54 1 M3 PEK. Plat Beton Tulang, Tulangan 2 Lapis DIA.16-17.5 cm dan DIA. 10-12.5 cm Tebal 20 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 lbr 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 178.1600 kg 11,500.00 2,048,840.00
Kawat Beton 2.6700 kg 18,000.00 48,060.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 2.9600 kg 18,000.00 53,280.00
Minyak Bekisting 1.4800 ltr 3,500.00 5,180.00
Bekesting Albasiah 0.1600 m³ 1,900,000.00 304,000.00
Jumlah Bahan 3,105,340.00
UPAH :
Pekerja 5.1940 Oh 45,000.00 233,730.00
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 2.4420 Oh 60,000.00 146,520.00
Tukang Besi 1.2936 Oh 60,000.00 77,616.00
Kepala Tukang 0.3868 Oh 65,000.00 25,142.00
Mandor 0.1748 Oh 70,000.00 12,236.00
Jumlah Pekerja 510,244.00
Jumlah Bahan + Pekerja 3,615,584.00
Keuntungan Max. 10 % 361,558.40
Jumlah Total 3,977,142.40
Dibulatkan 3,977,100.00
A.04.55 1 M3 PEK. Plat Beton Tulang, Tulangan 2 Lapis DIA.16 - 15 CM dan DIA. 12 - 15 cm Tebal 20 cm
BAHAN :
Semen Portland 323.0000 kg 1,360.00 439,280.00
Pasir Beton 0.5200 m³ 135,000.00 70,200.00
Batu Pecah Mesin 2/3 0.7800 m³ 175,000.00 136,500.00
Besi Beton (Polos / ulir) 210.5700 kg 11,500.00 2,421,555.00
Kawat Beton 3.1600 kg 18,000.00 56,880.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 2.9600 kg 18,000.00 53,280.00
Minyak Bekisting 1.4800 ltr 3,500.00 5,180.00
Bekesting Albasiah 0.1600 m³ 1,900,000.00 304,000.00
Jumlah Bahan 3,486,875.00
UPAH :
Pekerja 5.1940 Oh 45,000.00 233,730.00
Tukang Batu 0.2500 Oh 60,000.00 15,000.00
Tukang Kayu 2.4420 Oh 60,000.00 146,520.00
Tukang Besi 1.2936 Oh 60,000.00 77,616.00
Kepala Tukang 0.3868 Oh 65,000.00 25,142.00
Mandor 0.1748 Oh 70,000.00 12,236.00
Jumlah Pekerja 510,244.00
Jumlah Bahan + Pekerja 3,997,119.00
Keuntungan Max. 10 % 399,711.90
Jumlah Total 4,396,830.90
Dibulatkan 4,396,800.00
Page 75

1 2 3 4 5 6=(3x5)
A.05.01 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm 140.0000 bh 600.00 84,000.00
Semen Portland 22.2000 kg 1,360.00 30,192.00
Pasir Pasang 0.1020 m³ 120,000.00 12,240.00
Jumlah Bahan 126,432.00
UPAH :
Pekerja 0.6000 Oh 45,000.00 27,000.00
Tukang Batu 0.2000 Oh 60,000.00 12,000.00
Kepala Tukang 0.0200 Oh 65,000.00 1,300.00
Mandor 0.0300 Oh 70,000.00 2,100.00
Jumlah Pekerja 42,400.00
Jumlah Bahan + Pekerja 168,832.00
Keuntungan Max. 10 % 16,883.20
Jumlah Total 185,715.20
Dibulatkan 185,700.00
A.05.03 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm 70.0000 bh 600.00 42,000.00
Semen Portland 14.3700 kg 1,360.00 19,543.20
Pasir Pasang 0.0400 m³ 120,000.00 4,800.00
Jumlah Bahan 66,343.20
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1000 Oh 60,000.00 6,000.00
Kepala Tukang 0.0100 Oh 65,000.00 650.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 21,200.00
Jumlah Bahan + Pekerja 87,543.20
Keuntungan Max. 10 % 8,754.32
Jumlah Total 96,297.52
Dibulatkan 96,200.00
A.05.05 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm 70.0000 bh 600.00 42,000.00
Semen Portland 9.6800 kg 1,360.00 13,164.80
Pasir Pasang 0.0450 m³ 120,000.00 5,400.00
Jumlah Bahan 60,564.80
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1000 Oh 60,000.00 6,000.00
Kepala Tukang 0.0100 Oh 65,000.00 650.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 21,200.00
Jumlah Bahan + Pekerja 81,764.80
Keuntungan Max. 10 % 8,176.48
Jumlah Total 89,941.28
Dibulatkan 89,900.00
Page 76

1 2 3 4 5 6=(3x5)
A.06.02 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIAN
BAHAN :
Semen Portland 7.7760 kg 1,360.00 10,575.36
Pasir Pasang 0.0230 m³ 120,000.00 2,760.00
Jumlah Bahan 13,335.36
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1500 Oh 60,000.00 9,000.00
Kepala Tukang 0.0150 Oh 65,000.00 975.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 24,525.00
Jumlah Bahan + Pekerja 37,860.36
Keuntungan Max. 10 % 3,786.04
Jumlah Total 41,646.40
Dibulatkan 41,600.00
A.06.03 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN
BAHAN :
Semen Portland 6.2400 kg 1,360.00 8,486.40
Pasir Pasang 0.0240 m³ 120,000.00 2,880.00
Jumlah Bahan 11,366.40
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1500 Oh 60,000.00 9,000.00
Kepala Tukang 0.0150 Oh 65,000.00 975.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 24,525.00
Jumlah Bahan + Pekerja 35,891.40
Keuntungan Max. 10 % 3,589.14
Jumlah Total 39,480.54
Dibulatkan 39,400.00
A.06.04 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN
BAHAN :
Semen Portland 5.1840 kg 1,360.00 7,050.24
Pasir Pasang 0.0260 m³ 120,000.00 3,120.00
Jumlah Bahan 10,170.24
UPAH :
Pekerja 0.3000 Oh 45,000.00 13,500.00
Tukang Batu 0.1500 Oh 60,000.00 9,000.00
Kepala Tukang 0.0150 Oh 65,000.00 975.00
Mandor 0.0150 Oh 70,000.00 1,050.00
Jumlah Pekerja 24,525.00
Jumlah Bahan + Pekerja 34,695.24
Keuntungan Max. 10 % 3,469.52
Jumlah Total 38,164.76
Dibulatkan 38,100.00
A.06.20 1 M2 ACIAN PC
BAHAN :
Semen Portland 3.2500 kg 1,360.00 4,420.00
Jumlah Bahan 4,420.00
UPAH :
Pekerja 0.2000 Oh 45,000.00 9,000.00
Tukang Batu 0.1000 Oh 60,000.00 6,000.00
Kepala Tukang 0.0100 Oh 65,000.00 650.00
Mandor 0.0100 Oh 70,000.00 700.00
Jumlah Pekerja 16,350.00
Jumlah Bahan + Pekerja 20,770.00
Keuntungan Max. 10 % 2,077.00
Jumlah 22,847.00
Dibulatkan 22,800.00
A.07.01 1 M2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : -
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR ARSIP DAN PERPUSTAKAAN DAERAH KOTA BANJAR
LOKASI : KOTA BANJAR
SUMBER DANA : -
TAHUN ANGGARAN : 2013

NO URAIAN JUMLAH

1 2 3

A. PEKERJAAN PERSIAPAN

B. PEKERJAAN KONSTRUKSI

1 PEKERJAAN BANGUNAN LANTAI BAWAH 1,280,550,780.00

2 PEKERJAAN BANGUNAN LANTAI ATAS 1,059,212,932.00

JUMLAH REAL COST 2,339,763,712.00


PPN 10% 233,976,371.20
JUMLAH TOTAL HARGA 2,573,740,083.20
DIBULATKAN 2,573,740,000.00
TERBILANG :
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : -
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR ARSIP DAN PERPUSTAKAAN DAERAH KOTA BANJAR
LOKASI : KOTA BANJAR
SUMBER DANA : -
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO URAIAN PEKERJAAN KODE SATUAN VOLUME SATUAN HARGA SATUAN
ANALISA Rp. Rp.
1 2 3 4 5 6 7

A. PEKERJAAN PERSIAPAN
1 Pekerjaan Papan Nama Kegiatan/Banner DIHITUNG LS 1.00 150,000.00 150,000.00
2 Pekerjaan Pengukuran dan Pasangan Bouwplank A.01.01 M' 84.00 50,100.00 4,208,400.00
3 Pekerjaan Esteger Bambu A. STG M2 76.00 70,690.00 5,372,440.00
4 Pekerjaan Esteger Skapolding DIHITUNG M2 360.00 45,000.00 16,200,000.00
5 Pekerjaan Pengadaan Air Kerja DIHITUNG LS 1.00 2,500,000.00 2,500,000.00
6 Pekerjaan Bongkaran Sisa Bangunan Lama DIHITUNG LS 1.00 5,000,000.00 5,000,000.00
7 Pekerjaan Pengadaan Direksikeet DIHITUNG LS 1.00 4,000,000.00 4,000,000.00
8 Pekerjaan Pembuangan dan Pembersihan Sisa Pekerjaan DIHITUNG LS 1.00 2,000,000.00 2,000,000.00
9 Mobilisasi dan Demobilisasi Bahan dan Peralatan Kerja DIHITUNG LS 1.00 5,000,000.00 5,000,000.00
10 Quality Control DIHITUNG LS 1.00 2,500,000.00 2,500,000.00
11 Pagar Pengaman Pekerjaan (Keliling Lokasi Pekerjaan) DIHITUNG LS 1.00 10,000,000.00 10,000,000.00
12 Administrasi Dokumentasi dan Pelaporan DIHITUNG LS 1.00 7,500,000.00 7,500,000.00
JUMLAH TOTAL HARGA PEKERJAAN PERSIAPAN 64,430,840.00
B. PEKERJAAN KONSTRUKSI
1 PEKERJAAN BANGUNAN LANTAI BAWAH
1.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan Galian Tanah Pondasi Batu Kali A.02.01 M3 28.46 39,000.00 1,109,940.00
2 Pekerjaan Galian Tanah Pondasi Plat Beton A.02.03 M3 220.04 57,100.00 12,564,284.00
3 Pekerjaan Urugan Tanah Kembali Bekas Galian Pondasi Batu Kali A.02.09 M3 11.38 13,000.00 147,992.00
4 Pekerjaan Urugan Tanah Kembali Bekas Galian Pondasi Plat Beton A.02.09 M3 132.02 13,000.00 1,716,312.00
5 Pekerjaan Urugan Sirtu Peninggian Lantai Bangunan A.02.13 M3 88.80 159,500.00 14,163,600.00
6 Pekerjaan Urugan Pasir Alas Pondasi Batu Kali A.02.12 M3 1.62 147,600.00 239,112.00
7 Pekerjaan Urugan Pasir Alas Pondasi Plat Beton A.02.12 M3 7.03 147,600.00 1,037,628.00
8 Pekerjaan Urugan Pasir Alas Lantai A.02.12 M3 14.80 147,600.00 2,184,480.00
JUMLAH TOTAL HARGA 1.1 PEKERJAAN GALIAN DAN URUGAN 33,163,348.00

1.2 PEKERJAAN PONDASI DAN BETON


1 Pekerjaan Aan Stamping Batu Kali A.03.01 M3 5.31 262,800.00 1,395,468.00
2 Pekerjaan Pondasi Batu Kali 1:5 A.03.04 M3 11.82 555,300.00 6,563,646.00
3 Pekerjaan Pondasi Plat Beton PB1 Ukuran 1.8 X 1.8 K.225 A.04.PB1 M3 14.76 2,576,200.00 38,024,712.00
4 Pekerjaan Pondasi Plat Beton PB2 Ukuran 1.5 X 1.5 K.225 A.04.PB2 M3 19.20 2,621,800.00 50,338,560.00
5 Pekerjaan Pondasi Plat Beton PB2 Ukuran 1.0 X 1.0 K.225 A.04.PB2 M3 3.50 3,866,500.00 13,532,750.00
6 Pekerjaan Beton Sloof Beton 20/35 K.225 A.04.SL1 M3 0.18 4,139,900.00 745,182.00
7 Pekerjaan Beton Sloof Beton 20/30 K.225 A.04.SL2 M3 9.69 3,256,400.00 31,554,516.00
8 Pekerjaan Beton Sloof Beton 15/25 K.225 A.04.SL3 M3 2.61 3,738,200.00 9,756,702.00
9 Pekerjaan Beton Kolom KB.1 25/25 K.225 A.04.KB1A M3 17.10 4,339,300.00 74,202,030.00
10 Pekerjaan Beton Kolom KB.2 13/13 K.175 A.04.KB2 M3 2.95 4,858,700.00 14,333,165.00
11 Pekerjaan Beton Kolom KB.3 13/65 K.225 A.04.KB3 M3 3.55 4,559,000.00 16,184,450.00
12 Pekerjaan Beton Kolom KB.4 15/25 K.225 A.04.KB4 M3 0.41 4,078,500.00 1,672,185.00
13 Pekerjaan Beton Balok BL 1 25/50 K.225 A.04.BL1 M3 3.88 3,842,500.00 14,908,900.00
14 Pekerjaan Beton Balok BL 2 20/40 K.225 A.04.BL2 M3 11.16 4,305,300.00 48,047,148.00
15 Pekerjaan Beton Balok BL 3 20/35 K.225 A.04.BL3 M3 1.86 5,042,200.00 9,378,492.00
16 Pekerjaan Beton Balok BL 4 20/30 K.225 A.04.BL4 M3 3.00 3,903,000.00 11,709,000.00
17 Pekerjaan Beton Balok BL 5 15/25 K.225 A.04.BL5 M3 1.95 4,357,300.00 8,496,735.00
18 Pekerjaan Beton Balok Latai B.1 13/13 K.175 A.04.B1 M3 1.15 4,975,600.00 5,721,940.00
19 Pekerjaan Beton Balok B.2 15/25 K.175 A.04.B2 M3 2.14 5,496,700.00 11,762,938.00
20 Pekerjaan Beton Balok B.3 15/20 K.175 A.04.B3 M3 0.87 6,027,800.00 5,244,186.00
21 Pekerjaan Beton Plat Lantai Ruangan Tebal 12cm A.04.PLT12 M3 41.52 5,098,400.00 211,685,568.00
22 Pekerjaan Beton Plat Lantai Tangga dan Bordes Tebal 12cm A.04.PLT12 M3 2.25 5,098,400.00 11,471,400.00
23 Pekerjaan Beton Balok Bordes 15/25 K.225 A.04.BL5 M3 0.09 4,357,300.00 392,157.00
24 Pekerjaan Beton Balok Bordes 15/20 K.225 A.04.B3 M3 0.17 6,027,800.00 1,024,726.00
25 Pekerjaan Beton Plat Dak Topi KusenTebal 12cm A.04.PLT12 M3 7.44 5,098,400.00 37,932,096.00
26 Pekerjaan Beton Plat Lisplank Tebal 8cm A.04.PLT8 M3 2.36 4,179,500.00 9,863,620.00
27 Pekerjaan Beton Meja Wastafel Tebal 10cm A.04.PLT10 M3 0.24 5,316,600.00 1,275,984.00
28 Pekerjaan Lantai Kerja Pondasi Plat Beton A.04.14 M3 7.03 676,900.00 4,758,607.00
JUMLAH TOTAL HARGA 1.2 PEKERJAAN PONDASI DAN BETON 651,976,863.00

1.3 PEKERJAAN DINDING DAN PLESTERAN


1 Pekerjaan Dinding 1/2 Bata adukan 1:3 (trasram) A.05.03 M2 35.44 96,200.00 3,409,328.00
2 Pekerjaan Dinding 1/2 Bata adukan 1:5 A.05.05 M2 478.16 89,900.00 42,986,584.00
3 Pekerjaan Dinding 1 Bata adukan 1:5 A.05.01 M2 96.00 185,700.00 17,827,200.00
4 Pekerjaan Dinding Batu Alam Type Garis Ukuran 20x40cm A.10.28 M2 60.40 234,700.00 14,175,880.00
5 Pekerjaan Plesteran dan Acian Dinding Adukan 1:3 A.06.02 M2 70.88 41,600.00 2,948,608.00
6 Pekerjaan Plesteran dan Acian Dinding Adukan 1:5 A.06.08 M2 1,036.41 51,000.00 52,856,910.00
JUMLAH TOTAL HARGA 1.3 PEKERJAAN DINDING DAN PLESTERAN 134,204,510.00
HARGA JUMLAH
NO URAIAN PEKERJAAN KODE SATUAN VOLUME SATUAN HARGA SATUAN
ANALISA Rp. Rp.
1 2 3 4 5 6 7

1.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA


1 Pekerjaan Kusen Pintu Jendela Bouvenligh Aluminium Warna 4" DIHITUNG M' 299.60 105,000.00 31,458,000.00
2 Pekerjaan Daun Pintu Kaca Frameless 12mm (pintu depan) lengkap DIHITUNG PS 1.00 8,500,000.00 8,500,000.00
3 Pekerjaan Daun Pintu Kaca Aluminium Warna B 80 DIHITUNG UNT 10.00 1,500,000.00 15,000,000.00
4 Pekerjaan Daun Pintu Kaca Aluminium Warna B 45 DIHITUNG UNT 4.00 1,200,000.00 4,800,000.00
5 Pekerjaan Daun Pintu KM/WC Aluminium Warna B.70 DIHITUNG UNT 3.00 1,100,000.00 3,300,000.00
6 Pekerjaan Daun Jendela Aluminium Warna (casement) 1X0.55 DIHITUNG UNT 18.00 500,000.00 9,000,000.00
7 Pekerjaan Daun Jendela Aluminium Warna (casement) 0.25 X1.15 DIHITUNG UNT 16.00 400,000.00 6,400,000.00
8 Pekerjaan Kaca 5mm A.15.02 M2 45.22 84,300.00 3,812,046.00
JUMLAH TOTAL HARGA 1.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA 82,270,046.00

1.5 PEKERJAAN KUDA-KUDA ATAP DAN PLAFOND


1 Pekerjaan Rangka Plafond Besi Hollow+ Gypsum 2x2cm dan 4x4 cm A.09.HLGyp M2 392.02 95,600.00 37,477,112.00
2 Pekerjaan Lyst Plafond Gyfsum 15 cm DIHITUNG M' 500.82 15,000.00 7,512,300.00
JUMLAH TOTAL HARGA 1.5 PEKERJAAN KUDA-KUDA ATAP DAN PLAFOND 44,989,412.00

1.6 PEKERJAAN ALAT PENGGANTUNG DAN BESI


1 Pekerjaan Door Closer A.14.07 BUAH 14.00 237,200.00 3,320,800.00
2 Pekerjaan Handrill Tangga Stainlees UB m' 9.05 275,000.00 2,488,750.00
JUMLAH TOTAL HARGA 1.6 PEKERJAAN ALAT PENGGANTUNG DAN BESI 5,809,550.00

1.7 PEKERJAAN LANTAI


1 Pekerjaan Lantai Kramik 40x40cm Warna/Corak (Ruangan) A.10.09.1 M2 296.00 237,300.00 70,240,800.00
2 Pekerjaan Lantai Kramik 33x33cm Warna/Corak Anti Slip (Toilet) A.10.08 M2 39.50 182,500.00 7,208,750.00
3 Pekerjaan Dinding Kramik 25x60cm Warna/Corak (Toilet) T.180cm A.10.19.1 M2 31.50 194,700.00 6,133,050.00
4 Pekerjaan Dinding Kramik 25x50cm Warna/Corak (Dapur) T.200cm A.10.19.1 M2 9.53 194,700.00 1,855,491.00
5 Pekerjaan Dinding Kramik Plint 40 x 40 cm Warna/Corak (Toilet) A.10.09.1 M2 24.32 237,300.00 5,771,136.00
6 Pekerjaan Meja Kramik 25x60cm Warna/Corak (Dapur) L.60cm A.10.09.1 M2 3.90 237,300.00 925,470.00
JUMLAH TOTAL HARGA 1.7 PEKERJAAN LANTAI 92,134,697.00

1.8 PEKERJAAN PENGECATAN


1 Pekerjaan Cat Dinding sek. ICI A5878 M2 1,142.57 55,500.00 63,412,635.00
2 Pekerjaan Cat Plafond Sek. Vinilek A.16.06 M2 392.02 24,100.00 9,447,682.00
3 Pekerjaan Cat Batu (Coating batu bergaris) A.16.11.1 M2 60.40 34,700.00 2,095,880.00
JUMLAH TOTAL HARGA 1.8 PEKERJAAN PENGECATAN 74,956,197.00

1.9 PEKERJAAN SANITASI


1 Pekerjaan Pemasangan PDAM DIHITUNG UNIT 1.00 1,750,000.00 1,750,000.00
2 Pekerjaan Pemasangan Penampung Air Stainless Kap 1600 Liter DIHITUNG UNIT 1.00 3,200,000.00 3,200,000.00
3 Pekerjaan Septictank dan Resapan A.13.01 UNIT 1.00 10,182,000.00 10,182,000.00
4 Pekerjaan Pemasangan Kloset Duduk A.11.01 UNIT 3.00 3,046,700.00 9,140,100.00
5 Pekerjaan Instalasi Air Bersih Pipa PVC @3/4" A.12.08 M' 62.00 22,500.00 1,395,000.00
6 Pekerjaan Instalasi Air Kotor Pipa PVC @1,5" A.12.10 M' 8.00 26,700.00 213,600.00
7 Pekerjaan Instalasi Air Kotor Pipa PVC @2,5" A.12.12 M' 32.00 74,500.00 2,384,000.00
8 Pekerjaan Instalasi Air Kotor Pipa PVC @4" A.12.14 M' 20.00 99,400.00 1,988,000.00
9 Pekerjaan Instalasi Air Hujan Pipa PVC @3" Dari Dak Beton A.12.13 M' 145.00 82,400.00 11,948,000.00
10 Pekerjaan Pasangan Floor Drain A.12.17 BH 4.00 38,600.00 154,400.00
11 Pekerjaan Pasangan Kran Air (pada tempat wudlu) A.12.16 BH 5.00 40,900.00 204,500.00
12 Pekerjaan Pasangan Kran Air Leher Angsa type Elastis (Cuci Piring) A.12.16.1 BH 1.00 79,400.00 79,400.00
13 Pekerjaan Pasangan Zet Shower Cebok (Pada Closet Duduk) A.12.16.2 BH 3.00 95,900.00 287,700.00
14 Pekerjaan Pasangan Bak Cuci Stainless (Pada Dapur) A.12.15 BH 1.00 274,300.00 274,300.00
JUMLAH TOTAL HARGA 1.9 PEKERJAAN SANITASI 43,201,000.00

1.10 PEKERJAAN INSTALASI LISTRIK


1 Pekerjaan Penambahan Daya VA 23,000.00 1,000.00 23,000,000.00
2 Pekerjaan Pemasangan Panel MDP SET 1.00 5,988,070.00 5,988,070.00
3 Pekerjaan Pemasangan Panel SDP SET 1.00 2,249,720.00 2,249,720.00
4 Pemasangan Kabel NYY 4x16 mm² dari APP ke MDP M' 26.00 126,500.00 3,289,000.00
5 Pemasangan Kabel NYY 4x10 mm² dari MDP ke SDP M' 13.00 89,870.00 1,168,310.00
6 Pemasangan Grounding SET 1.00 956,340.00 956,340.00
7 Pek. Instalasi 1 Titik cahaya L.3 ttk 35.00 184,833.00 6,469,155.00
8 Pek. Pas Lampu RMI 2x36w set 7.00 373,750.00 2,616,250.00
9 Pek. Pas. Lampu RMI 2x18w set 4.00 336,950.00 1,347,800.00
10 Pek. Pas. Baret 19w set 1.00 240,000.00 240,000.00
11 Pek. Pas. Downlight 9 Watt set 18.00 109,250.00 1,966,500.00
12 Pek Pas Lampu SL 9 Watt set 5.00 51,750.00 258,750.00
13 Pek. Instalasi 1 Titik KK L.4 ttk 25.00 183,755.00 4,593,875.00
14 Pek Pas Kotak Kontak AC bh 10.00 54,000.00 540,000.00
15 Pek. Pas. Kotak Kontak bh 15.00 14,400.00 216,000.00
16 Pek Instalasi Outlet Lantai L.12 bh 3.00 515,064.00 1,545,192.00
17 Pek. Pas. Outlet Lantai (KK dan Data) set 3.00 690,000.00 2,070,000.00
18 Pek. Pas. Saklar Tunggal bh 9.00 13,225.00 119,025.00
19 Pek. Pas. Saklar Ganda bh 6.00 17,250.00 103,500.00
JUMLAH TOTAL HARGA 1.10 PEKERJAAN INSTALASI LISTRIK 35,737,487.00
HARGA JUMLAH
NO URAIAN PEKERJAAN KODE SATUAN VOLUME SATUAN HARGA SATUAN
ANALISA Rp. Rp.
1 2 3 4 5 6 7

1.11 PEKERJAAN PENANGKAL PETIR


1 Pemasangan Kawat BC 35 mm L.11 m' 48.00 113,300.00 5,438,400.00
2 Pemasangan Finial Petir L.10 set 2.00 234,850.00 469,700.00
3 Pemasangan Grounding L.5 set 2.00 956,340.00 1,912,680.00
JUMLAH TOTAL HARGA 1.11 PEKERJAAN PENANGKAL PETIR 7,820,780.00

1.12 PEKERJAAN SALURAN DATA DAN TELEPON


1 PekTitik Data L.6 ttk 9.00 190,850.00 1,717,650.00
2 Pek. Pas Outlet Data ttk 9.00 54,000.00 486,000.00
3 PekTitik telepon L.6 ttk 10.00 92,840.00 928,400.00
4 Pek. Pas Outlet telepon ttk 10.00 50,400.00 504,000.00
JUMLAH TOTAL HARGA 1.12 PEKERJAAN SALURAN DATA DAN TELEPON 3,636,050.00

1.13 PEKERJAAN LAIN-LAIN


1 Pekerjaan Pemasangan Logo Kota Banjar DIHITUNG UNIT 1.00 500,000.00 500,000.00
2 Pekerjaan Pemasangan Hurup Stainless t =15 cm DIHITUNG UNIT 465.00 8,000.00 3,720,000.00
3 Pekerjaan Pemasangan Hurup Stainless t =25 cm DIHITUNG UNIT 250.00 8,000.00 2,000,000.00
JUMLAH TOTAL HARGA 1.13 PEKERJAAN LAIN-LAIN 6,220,000.00
JUMLAH TOTAL HARGA PEKERJAAN BANGUNAN LANTAI BAWAH 1,280,550,780.00
HARGA JUMLAH
NO URAIAN PEKERJAAN KODE SATUAN VOLUME SATUAN HARGA SATUAN
ANALISA Rp. Rp.
1 2 3 4 5 6 7

2 PEKERJAAN BANGUNAN LANTAI ATAS


2.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan Urugan Pasir Alas Lantai A.02.12 M3 15.28 147,600.00 2,254,590.00
JUMLAH TOTAL HARGA 2.1 PEKERJAAN GALIAN DAN URUGAN 2,254,590.00

2.2 PEKERJAAN PONDASI DAN BETON


1 Pekerjaan Beton Kolom KA 1 25/25 K. 225 A.04.KA1 M3 9.20 4,717,400.00 43,400,080.00
2 Pekerjaan Beton Kolom KA 2 20/20 K.225 A.04.KA2 M3 2.58 4,836,900.00 12,479,202.00
3 Pekerjaan Beton Kolom KA 3 13/13 K.175 A.04.KA3 M3 4.12 5,091,200.00 20,975,744.00
4 Pekerjaan Beton Kolom KA 4 13/65 K.225 A.04.KA4 M3 3.40 4,791,500.00 16,291,100.00
5 Pekerjaan Beton Balok B.1 13/13 K.175 A.04.B1 M3 1.24 4,975,600.00 6,169,744.00
6 Pekerjaan Beton Balok B.2 15/25 K.175 A.04.B2 M3 2.30 5,496,700.00 12,642,410.00
7 Pekerjaan Beton Balok B.3 15/20 K.175 A.04.B3 M3 0.66 6,027,800.00 3,978,348.00
8 Pekerjaan Beton Balok B.4 20/30 K.175 A.04.B4 M3 3.60 5,206,500.00 18,743,400.00
9 Pekerjaan Beton Ring Balk RB 1 20/30 K.225 A.04.RB1 M3 7.62 7,194,300.00 54,820,566.00
10 Pekerjaan Beton Ring Balk RB 2 15/25 K.225 A.04.RB2 M3 4.16 5,694,800.00 23,690,368.00
11 Pekerjaan Beton Plat Lantai Dak Tebal 12cm A.04.PLT12 M3 12.53 5,098,400.00 63,882,952.00
12 Pekerjaan Beton Plat Lisplank Tebal 8 cm A.04.PLT8 M3 3.02 4,179,500.00 12,622,090.00
13 Pekerjaan Beton Meja Wastafel Tebal 8 cm A.04.PLT8 M3 0.07 4,179,500.00 292,565.00
JUMLAH TOTAL HARGA 2.2 PEKERJAAN PONDASI DAN BETON 289,988,569.00

2.3 PEKERJAAN DINDING DAN PLESTERAN


1 Pekerjaan Dinding 1/2 Bata adukan 1:5 A.05.05 M2 1,222.60 89,900.00 109,911,740.00
2 Pekerjaan Dinding 1 Bata adukan 1:5 A.05.01 M2 96.00 185,700.00 17,827,200.00
3 Pekerjaan Dinding Batu Alam Type Garis Ukuran 20x40cm A.10.28 M2 22.78 234,700.00 5,346,466.00
4 Pekerjaan Plesteran dan Acian Dinding Adukan 1:5 A.06.04 M2 2,266.62 38,100.00 86,358,222.00
5 Pekerjaan Profilan DIHITUNG M' 13.60 50,000.00 680,000.00
JUMLAH TOTAL HARGA 2.3 PEKERJAAN DINDING DAN PLESTERAN 220,123,628.00

2.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA


1 Pekerjaan Kusen Pintu Jendela Bouvenligh Aluminium Warna 4" DIHITUNG M' 347.20 105,000.00 36,456,000.00
2 Pekerjaan Daun Pintu Kaca Aluminium Warna B 80 DIHITUNG UNT 13.00 1,500,000.00 19,500,000.00
3 Pekerjaan Daun Pintu Kaca Aluminium Warna B 45 DIHITUNG UNT 6.00 1,200,000.00 7,200,000.00
4 Pekerjaan Daun Pintu KM/WC Aluminium Warna B.70 DIHITUNG UNT 2.00 1,100,000.00 2,200,000.00
5 Pekerjaan Daun Jendela Aluminium Warna (casement) 1X0.55 DIHITUNG UNT 18.00 500,000.00 9,000,000.00
6 Pekerjaan Daun Jendela Aluminium Warna (casement) 0.25 X1.15 DIHITUNG UNT 16.00 400,000.00 6,400,000.00
7 Pekerjaan Kaca Ess 5mm A.15.01.1 M2 21.60 96,400.00 2,082,240.00
8 Pekerjaan Kaca 5mm A.15.02 M2 47.03 84,300.00 3,964,629.00
JUMLAH TOTAL HARGA 2.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA 86,802,869.00

2.5 PEKERJAAN KUDA-KUDA ATAP DAN PLAFOND


1 Pekerjaan Rangka Atap Kuda-Kuda Baja Ringan 1mm Jarak 125cm DIHITUNG M2 506.25 140,000.00 70,875,000.00
2 Pekerjaan Penutup Atap Genting Metal Corak Lapis Pasir Tebal 0,28mm A.08.BM M2 506.25 110,500.00 55,940,625.00
3 Pekerjaan Bubungan Genting Metal Type Bulat A.08.BM M' 59.00 92,800.00 5,475,200.00
4 Pekerjaan Lystplank GRC L 25cm A.08.LG M' 84.00 39,600.00 3,326,400.00
5 Pekerjaan Rangka Plafond Besi Hollow+ Gypsum 2x2cm dan 4x4 cm A.09.HLGyp M2 267.62 95,600.00 25,584,472.00
6 Pekerjaan Rangka Plafond Besi Hollow+ Grc 2x2cm dan 4x4 cm A.09.HLGrc M2 107.40 89,600.00 9,623,040.00
7 Pekerjaan Lyst Plafond Gyfsum 15 cm DIHITUNG M' 416.00 15,000.00 6,240,000.00
8 Pekerjaan Lyst Plafond Kayu Lokal 4 cm A.09.09 M' 222.40 10,000.00 2,224,000.00
9 Pekerjaan Momolo Plat Besi pada Ujung Atap DIHITUNG UNIT 2.00 350,000.00 700,000.00
JUMLAH TOTAL HARGA 2.5 PEKERJAAN KUDA-KUDA ATAP DAN PLAFOND 179,988,737.00

2.6 PEKERJAAN ALAT PENGGANTUNG DAN BESI


1 Pekerjaan Door Closer A.14.07 BUAH 20.00 237,200.00 4,744,000.00
JUMLAH TOTAL HARGA 2.6 PEKERJAAN ALAT PENGGANTUNG DAN BESI 4,744,000.00

2.7 PEKERJAAN LANTAI


1 Pekerjaan Lantai Kramik 40x40cm Warna/Corak (Ruangan) A.10.09.1 M2 305.50 237,300.00 72,495,150.00
2 Pekerjaan Lantai Kramik 40x40cm Warna/Corak Anti Slip A.10.09.1 M2 13.50 237,300.00 3,203,550.00
3 Pekerjaan Lantai Kramik 33x33cm Warna/Corak Anti Slip (Toilet) A.10.06 M2 9.00 160,200.00 1,441,800.00
4 Pekerjaan Dinding Kramik 20x60cm Warna/Corak (Toilet) T.180cm A.10.19.1 M2 33.30 194,700.00 6,483,510.00
5 Pekerjaan Dinding Kramik 20x60cm Warna/Corak (Wastafel) T.180cm A.10.19.1 M2 3.08 194,700.00 599,676.00
JUMLAH TOTAL HARGA 2.7 PEKERJAAN LANTAI 84,223,686.00

2.8 PEKERJAAN PENGECATAN


1 Pekerjaan Cat Dinding sek. ICI A5878 M2 2,266.62 55,500.00 125,797,410.00
2 Pekerjaan Cat Plafond Sek. Vinilek A.16.06 M2 375.62 24,100.00 9,052,442.00
3 Pekerjaan Cat Lisplank dg Cat Kayu A.16.08 M2 23.52 39,600.00 931,392.00
4 Pekerjaan Cat Batu (Coating batu bergaris) A.16.11.1 M2 22.78 34,700.00 790,466.00
JUMLAH TOTAL HARGA 2.8 PEKERJAAN PENGECATAN 136,571,710.00
HARGA JUMLAH
NO URAIAN PEKERJAAN KODE SATUAN VOLUME SATUAN HARGA SATUAN
ANALISA Rp. Rp.
1 2 3 4 5 6 7

2.9 PEKERJAAN SANITASI


1 Pekerjaan Pemasangan Kloset Duduk A.11.01 UNIT 4.00 3,046,700.00 12,186,800.00
2 Pekerjaan Instalasi Air Bersih Pipa PVC @3/4" A.12.08 M' 62.00 22,500.00 1,395,000.00
3 Pekerjaan Instalasi Air Kotor Pipa PVC @1,5" A.12.10 M' 12.00 26,700.00 320,400.00
4 Pekerjaan Instalasi Air Kotor Pipa PVC @2,5" A.12.12 M' 55.00 74,500.00 4,097,500.00
5 Pekerjaan Instalasi Air Kotor Pipa PVC @4" A.12.14 M' 52.00 99,400.00 5,168,800.00
6 Pekerjaan Instalasi Air Hujan Pipa PVC @3" Dari Dak Beton A.12.13 M' 120.00 82,400.00 9,888,000.00
7 Pekerjaan Pasangan Floor Drain A.12.17 BH 4.00 38,600.00 154,400.00
8 Pekerjaan Pasangan Kran Air (pada tempat wudlu) A.12.16 BH 4.00 40,900.00 163,600.00
9 Pekerjaan Pasangan Wastafel Bulat Lengkap Cermin DIHITUNG UNIT 1.00 1,750,000.00 1,750,000.00
10 Pekerjaan Pasangan Zet Shower Cebok (Pada Closet Duduk) A.12.16.2 BH 4.00 95,900.00 383,600.00
JUMLAH TOTAL HARGA 2.9 PEKERJAAN SANITASI 35,508,100.00

2.10 PEKERJAAN INSTALASI LISTRIK


1 Pek. Instalasi 1 Titik cahaya DIHITUNG ttk 26.00 184,833.00 4,805,658.00
2 Pek. Pas Lampu RMI 2x36w DIHITUNG set 10.00 373,750.00 3,737,500.00
3 Pek. Pas. Lampu RMI 2x18w DIHITUNG set 6.00 336,950.00 2,021,700.00
4 Pek. Pas. Downlight 9 Watt DIHITUNG set 5.00 109,250.00 546,250.00
5 Pek Pas Lampu SL 9 Watt DIHITUNG set 5.00 51,750.00 258,750.00
6 Pek. Instalasi 1 Titik KK DIHITUNG ttk 21.00 183,755.00 3,858,855.00
7 Pek Pas Kotak Kontak AC DIHITUNG bh 9.00 54,000.00 486,000.00
8 Pek. Pas. Kotak Kontak DIHITUNG bh 9.00 14,400.00 129,600.00
9 Pek. Pas. Saklar Tunggal DIHITUNG bh 10.00 13,225.00 132,250.00
10 Pek. Pas. Saklar Ganda DIHITUNG bh 4.00 17,250.00 69,000.00
JUMLAH TOTAL HARGA 2.10 PEKERJAAN INSTALASI LISTRIK 16,045,563.00

2.11 PEKERJAAN SALURAN DATA DAN TELEPON


1 PekTitik Data DIHITUNG BUAH 8.00 190,850.00 1,526,800.00
2 Pek. Pas Outlet Data DIHITUNG BUAH 8.00 54,000.00 432,000.00
3 PekTitik telepon UPAH-BAHAN BUAH 7.00 92,840.00 649,880.00
4 Pek. Pas Outlet telepon UPAH-BAHAN BUAH 7.00 50,400.00 352,800.00
JUMLAH TOTAL HARGA 2.11 PEKERJAAN SALURAN DATA DAN TELEPON 2,961,480.00
JUMLAH TOTAL HARGA PEKERJAAN BANGUNAN LANTAI ATAS 1,059,212,932.00
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN KAMAR TYPE DELUXE ROOM
LOKASI : PANGANDARAN
TAHUN ANGGARAN : 2013

NO URAIAN JUMLAH

1 2 3

A. PEKERJAAN PERSIAPAN 33,615,680.00

B. PEKERJAAN KONSTRUKSI

1 PEKERJAAN BANGUNAN LANTAI I


1.1 PEKERJAAN GALIAN DAN URUGAN 53,910,702.40
1.2 PEKERJAAN PONDASI DAN BETON 656,909,671.11
1.3 PEKERJAAN DINDING DAN PLESTERAN 92,310,085.50
1.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA 15,764,703.60
1.5 PEKERJAAN PLAFOND 45,535,560.00
1.6 PEKERJAAN ALAT PENGGANTUNG 1,370,700.00
1.7 PEKERJAAN LANTAI 97,113,363.90
1.8 PEKERJAAN PENGECATAN 37,064,461.56
1.9 PEKERJAAN SANITASI 34,054,780.00
1.10 PEKERJAAN INSTALASI LISTRIK 26,033,194.00

2 PEKERJAAN BANGUNAN LANTAI II


2.1 PEKERJAAN URUGAN 2,674,512.00
2.2 PEKERJAAN BETON 379,680,320.00
2.3 PEKERJAAN DINDING DAN PLESTERAN 212,366,118.30
2.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA 35,672,631.40
2.5 PEKERJAAN PLAFOND 49,612,560.00
2.6 PEKERJAAN ALAT PENGGANTUNG 3,800,000.00
2.7 PEKERJAAN LANTAI 138,223,146.90
2.8 PEKERJAAN PENGECATAN 72,005,379.80
2.9 PEKERJAAN SANITASI 70,734,200.00
2.10 PEKERJAAN INSTALASI LISTRIK 37,132,087.00

3 PEKERJAAN BANGUNAN LANTAI III


3.1 PEKERJAAN URUGAN 2,674,512.00
3.2 PEKERJAAN BETON 296,882,535.60
3.3 PEKERJAAN DINDING DAN PLESTERAN 212,366,118.30
3.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA 35,672,631.40
3.5 PEKERJAAN ATAP DAN PLAFOND 338,913,361.82
3.6 PEKERJAAN ALAT PENGGANTUNG 3,800,000.00
3.7 PEKERJAAN LANTAI 131,924,493.00
3.8 PEKERJAAN PENGECATAN 72,005,379.80
3.9 PEKERJAAN SANITASI 70,734,200.00
3.10 PEKERJAAN INSTALASI LISTRIK 37,097,587.00

JUMLAH REAL COST 3,297,654,676.39


DIBULATKAN 3,297,654,000.00

TERBILANG : TIGA MILYAR DUA RATUS SEMBILAN PULUH TUJUH JUTA ENAM RATUS LIMA PULUH EMPAT RIBU RUPIAH

Dibuat :

RASIM
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN KAMAR TYPE DELUXE ROOM
LOKASI : PANGANDARAN
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6

A. PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Pasangan Bouwplank m1 122.00 50,100.00 6,112,200.00
2 Pekerjaan Esteger Bambu m2 92.00 70,690.00 6,503,480.00
3 Pekerjaan Pengadaan Air Kerja ls 1.00 3,500,000.00 3,500,000.00
4 Pekerjaan Pembuangan dan Pembersihan Sisa Pekerjaan ls 1.00 3,000,000.00 3,000,000.00
5 Pekerjaan Bongkaran ls 1.00 10,000,000.00 10,000,000.00
5 Pagar Pengaman Pekerjaan (Keliling Lokasi Pekerjaan) ls 1.00 4,500,000.00 4,500,000.00
Jumlah 33,615,680.00
B. PEKERJAAN KONSTRUKSI
1 PEKERJAAN BANGUNAN LANTAI I
1.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan Galian Tanah Pondasi Plat Beton m3 368.06 48,000.00 17,666,880.00
2 Pekerjaan Urugan Tanah Kembali Bekas Galian Pondasi Plat Beton m3 276.05 13,000.00 3,588,585.00
3 Pekerjaan Urugan Sirtu Peninggian Lantai Bangunan m3 179.60 159,500.00 28,646,200.00
4 Pekerjaan Urugan Pasir Alas Pondasi Plat Beton m3 9.20 147,600.00 1,358,141.40
5 Pekerjaan Urugan Pasir Alas Lantai m3 17.96 147,600.00 2,650,896.00
Jumlah 53,910,702.40

1.2 PEKERJAAN PONDASI DAN BETON


1 Pekerjaan Pondasi Plat Beton P1 Ukuran 200 X 200 K.225 m3 39.11 2,576,200.00 100,752,605.80
2 Pekerjaan Pondasi Plat Beton P2 Ukuran 200 X 200 K.225 m3 15.36 2,576,200.00 39,581,380.85
3 Pekerjaan Beton Sloof Beton ( SL1 ) 20/30 K.225 m3 14.80 3,551,900.00 52,575,223.80
4 Pekerjaan Beton Kolom K.1 30/50 K.225 m3 25.62 3,983,500.00 102,057,270.00
5 Pekerjaan Beton Kolom K2 30/30 K.225 m3 6.04 3,930,800.00 23,738,101.20
6 Pekerjaan Beton Balok B.1 30/50 K.225 m3 16.80 3,678,530.00 61,799,304.00
7 Pekerjaan Beton Balok B.2 20/35 K.225 m3 16.56 3,825,340.00 63,347,630.40
8 Pekerjaan Beton Balok BL.2 15/20 K.176 m3 1.20 3,896,400.00 4,675,680.00
9 Pekerjaan Beton Plat Lantai Tebal 12cm m3 43.49 4,101,340.00 178,359,073.92
10 Pekerjaan Beton Plat Lantai Tangga dan Bordes Tebal 15cm m3 2.64 3,977,100.00 10,499,544.00
11 Pekerjaan Beton Balok Bordes 15/25 K.225 m3 0.31 3,828,070.00 1,191,486.79
12 Pekerjaan Beton Plat Dak Topi Tebal 10cm m3 2.40 3,842,500.00 9,222,000.00
13 Pekerjaan Beton Meja dapur Tebal 10cm m3 0.75 3,842,500.00 2,881,875.00
14 Pekerjaan Lantai Kerja Pondasi Plat Beton m3 9.20 676,900.00 6,228,495.35
Jumlah 656,909,671.11

1.3 PEKERJAAN DINDING DAN PLESTERAN


1 Pekerjaan Dinding 1/2 Bata adukan 1:5 m2 426.32 89,900.00 38,325,718.50
2 Pekerjaan Plesteran Adukan 1:5 m2 852.63 38,100.00 32,485,203.00
3 Pekerjaan Acian m2 852.63 22,800.00 19,439,964.00
4 Pekerjaan Profilan m1 41.18 50,000.00 2,059,200.00
Jumlah 92,310,085.50

1.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA


1 Pekerjaan Kusen Pintu Jendela Kayu Jati m3 0.34 14,879,100.00 5,124,362.04
2 Pekerjaan Daun Pintu Kayu Jati m2 4.92 743,600.00 3,658,512.00
3 Pekerjaan Daun Jendela kayu Jati m2 4.47 500,700.00 2,237,528.16
4 Pekerjaan Kusen dan Daun Pintu Km unit 6.00 750,000.00 4,500,000.00
5 Pekerjaan Kaca 5mm m2 2.90 84,300.00 244,301.40
Jumlah 15,764,703.60
HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6

1.5 PEKERJAAN PLAFOND


1 Pekerjaan Rangka Plafond Kayu Lokal Kelas II m2 362.40 76,300.00 27,651,120.00
2 Pekerjaan Plafond Gifsum m2 362.40 38,100.00 13,807,440.00
3 Pekerjaan Lyst Plafond Gyfsum 15 cm m1 271.80 15,000.00 4,077,000.00
Jumlah 45,535,560.00

1.6 PEKERJAAN ALAT PENGGANTUNG


1 Pas.Engsel Pintu bh 9.00 31,500.00 283,500.00
2 Pas.Engsel Jendela bh 14.00 22,100.00 309,400.00
3 Pas.Kunci Pintu set 3.00 133,500.00 400,500.00
4 Pas.Hak Angin bh 7.00 27,300.00 191,100.00
5 Pas.Slot Jendela bh 7.00 26,600.00 186,200.00
Jumlah 1,370,700.00

1.7 PEKERJAAN LANTAI


1 Pekerjaan Lantai Kramik 60x60cm Warna/Corak m2 362.40 237,300.00 85,997,520.00
2 Pekerjaan Lantai Kramik 30x60cm Anti Slip m2 24.13 261,030.00 6,298,653.90
3 Pekerjaan Dinding Kramik Plint 10 x 60 cm Warna/Corak m2 20.30 237,300.00 4,817,190.00
Jumlah 97,113,363.90

1.8 PEKERJAAN PENGECATAN


1 Pekerjaan Cat Dinding sek. Dulux m2 893.81 29,700.00 26,546,275.80
2 Pekerjaan Cat Plafond Sek. Catylac m2 362.40 24,100.00 8,733,840.00
3 Pekerjaan Melamic Kayu m2 16.98 105,100.00 1,784,345.76
Jumlah 37,064,461.56

1.9 PEKERJAAN SANITASI


1 Pekerjaan Septictank dan Resapan unit 2.00 15,000,000.00 30,000,000.00
2 Pekerjaan Instalasi Air Kotor Pipa PVC Ø1,5" m1 13.20 26,700.00 352,440.00
3 Pekerjaan Instalasi Air Kotor Pipa PVC Ø3" m1 23.10 82,400.00 1,903,440.00
4 Pekerjaan Instalasi Air Kotor Pipa PVC Ø4" m1 16.50 99,400.00 1,640,100.00
5 Pekerjaan Kram Leher Angsa bh 2.00 79,400.00 158,800.00
Jumlah 34,054,780.00

1.10 PEKERJAAN INSTALASI LISTRIK


1 Pekerjaan Pemasangan Panel SDP set 1.00 2,449,040.00 2,449,040.00
2 Pemasangan Kabel NYY 4x16 mm² dari APP ke MDP m1 20.00 126,500.00 2,530,000.00
3 Pemasangan Kabel NYY 4x10 mm² dari MDP ke SDP m1 20.00 89,870.00 1,797,400.00
4 Pemasangan Grounding set 2.00 956,340.00 1,912,680.00
5 Pek. Instalasi 1 Titik cahaya ttk 53.00 184,833.00 9,796,149.00
6 Pek. Pas. Downlight 9 Watt set 43.00 109,250.00 4,697,750.00
7 Pek Pas Lampu SL 9 Watt set 6.00 51,750.00 310,500.00
8 Pek. Instalasi 1 Titik KK ttk 10.00 183,755.00 1,837,550.00
9 Pek Pas Kotak Kontak AC bh 4.00 54,000.00 216,000.00
10 Pek. Pas. Kotak Kontak bh 10.00 14,400.00 144,000.00
11 Pek. Pas. Saklar Tunggal bh 5.00 13,225.00 66,125.00
12 Pek. Pas. Saklar Ganda bh 14.00 17,250.00 241,500.00
13 Pek. Pas. Saklar Hotel bh 2.00 17,250.00 34,500.00
Jumlah 26,033,194.00
HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6

2 PEKERJAAN BANGUNAN LANTAI II


2.1 PEKERJAAN URUGAN
1 Pekerjaan Urugan Pasir Alas Lantai T = 3 cm m3 18.12 147,600.00 2,674,512.00
Jumlah 2,674,512.00

2.2 PEKERJAAN BETON


1 Pekerjaan Beton Kolom K.1 30/50 K.225 m3 16.80 3,983,500.00 66,922,800.00
2 Pekerjaan Beton Kolom K2 30/30 K.225 m3 3.96 3,930,800.00 15,565,968.00
3 Pekerjaan Beton Kolom KP 12/12 K.175 m3 2.19 5,776,500.00 12,643,603.20
4 Pekerjaan Beton Balok B.1 25/50 K.225 m3 16.80 3,678,530.00 61,799,304.00
5 Pekerjaan Beton Balok B.2 20/35 K.225 m3 16.56 3,825,340.00 63,347,630.40
6 Pekerjaan Beton Balok BL.2 15/20 K.176 m3 1.20 3,896,400.00 4,675,680.00
7 Pekerjaan Beton Plat Lantai Tebal 12cm m3 33.96 4,101,340.00 139,261,819.97
8 Pekerjaan Beton Plat Lantai Tangga dan Bordes Tebal 15cm m3 0.75 3,977,100.00 2,982,825.00
9 Pekerjaan Beton Balok Bordes 15/25 K.225 m3 0.25 3,828,070.00 953,189.43
10 Pekerjaan Beton Plat Dak Topi Tebal 10cm m3 3.00 3,842,500.00 11,527,500.00
Jumlah 379,680,320.00

2.3 PEKERJAAN DINDING DAN PLESTERAN


1 Pekerjaan Dinding 1/2 Bata adukan 1:5 m2 994.04 89,900.00 89,363,746.50
2 Pekerjaan Plesteran Adukan 1:5 m2 1,988.07 38,100.00 75,745,467.00
3 Pekerjaan Plesteran Kolom Adukan 1:3 m2 29.95 41,600.00 1,246,003.20
4 Pekerjaan Acian m2 2,018.02 22,800.00 46,010,901.60
Jumlah 212,366,118.30

2.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA


1 Pekerjaan Kusen Pintu Dan Jendela Kayu jati m3 0.69 14,879,100.00 10,207,062.60
2 Pekerjaan Daun Pintu Kayu Jati m2 16.40 743,600.00 12,195,040.00
3 Pekerjaan Daun Jendela Kayu Jati m2 6.38 500,700.00 3,196,468.80
4 Pekerjaan Kusen dan Daun Pintu Km unit 9.00 750,000.00 6,750,000.00
5 Pekerjaan Kaca 5mm m2 4.20 84,300.00 354,060.00
6 Pas. Loster Beton bh 54.00 30,000.00 1,620,000.00
7 Pas. Glass Blok bh 54.00 25,000.00 1,350,000.00
Jumlah 35,672,631.40

2.5 PEKERJAAN PLAFOND


1 Pekerjaan Rangka Plafond Usuk 6 / 6 cm m2 362.40 76,300.00 27,651,120.00
2 Pekerjaan Plafond Gypsum m2 362.40 38,100.00 13,807,440.00
3 Pekerjaan Lyst Plafond Gyfsum 15 cm m1 543.60 15,000.00 8,154,000.00
Jumlah 49,612,560.00

2.6 PEKERJAAN ALAT PENGGANTUNG


1 Pas.Engsel Pintu bh 30.00 31,500.00 945,000.00
2 Pas.Engsel Jendela bh 20.00 22,100.00 442,000.00
3 Pas.Kunci Pintu set 10.00 133,500.00 1,335,000.00
4 Pas.Hak Angin bh 20.00 27,300.00 546,000.00
5 Pas.Slot Jendela bh 20.00 26,600.00 532,000.00
Jumlah 3,800,000.00
HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6

2.7 PEKERJAAN LANTAI


1 Pekerjaan Lantai Kramik 60x60cm Warna/Corak m2 330.81 237,300.00 78,501,213.00
2 Pekerjaan Lantai Kramik 30x30cm Warna/Corak Anti Slip (Toilet) m2 54.00 182,500.00 9,855,000.00
3 Pekerjaan Dinding Kramik 30x60cm Warna/Corak (Toilet) T.200cm m2 165.60 237,300.00 39,296,880.00
4 Pekerjaan Dinding Kramik Plint 10 x 40 cm Warna/Corak m2 18.00 237,300.00 4,271,400.00
5 Pekerjaan Kramik 30 x 60 cm Anti Slip ( tangga ) m2 24.13 261,030.00 6,298,653.90
Jumlah 138,223,146.90

2.8 PEKERJAAN PENGECATAN


1 Pekerjaan Cat Dinding sek. Dulux m2 1,988.07 29,700.00 59,045,679.00
2 Pekerjaan Cat Plafond Sek. Catylac m2 362.40 24,100.00 8,733,840.00
3 Pekerjaan Melamic Kayu m2 40.21 105,100.00 4,225,860.80
Jumlah 72,005,379.80

2.9 PEKERJAAN SANITASI


1 Pekerjaan Pemasangan Kloset Duduk bh 9.00 3,046,700.00 27,420,300.00
2 Pekerjaan Instalasi Air Bersih Pipa PVC Ø 1/2" m1 80.00 16,900.00 1,352,000.00
3 Pekerjaan Instalasi Air Bersih Pipa PVC Ø3/4" m1 50.00 22,500.00 1,125,000.00
4 Pekerjaan Instalasi Air Kotor Pipa PVC Ø3" m1 80.00 82,400.00 6,592,000.00
5 Pekerjaan Instalasi Air Kotor Pipa PVC Ø4" m1 80.00 99,400.00 7,952,000.00
6 Pekerjaan Pasangan Floor Drain bh 9.00 38,600.00 347,400.00
7 Pekerjaan Pasangan Kran Air Kran Biasa bh 9.00 40,900.00 368,100.00
8 Pekerjaan Pasangan Kran Shower bh 9.00 350,000.00 3,150,000.00
9 Pekerjaan Pasangan Kran Jet Washer bh 9.00 250,000.00 2,250,000.00
10 Pekerjaan Pasangan Kran panas dingin bh 6.00 500,000.00 3,000,000.00
11 Pekerjaan Pasangan Wastafel unit 9.00 1,908,600.00 17,177,400.00
Jumlah 70,734,200.00

2.10 PEKERJAAN INSTALASI LISTRIK


1 Pekerjaan Pemasangan Panel SDP set 1.00 2,449,040.00 2,449,040.00
2 Pemasangan Kabel NYY 4x16 mm² dari APP ke MDP m1 20.00 126,500.00 2,530,000.00
3 Pemasangan Kabel NYY 4x10 mm² dari MDP ke SDP m1 20.00 89,870.00 1,797,400.00
4 Pek. Instalasi 1 Titik cahaya ttk 84.00 184,833.00 15,525,972.00
5 Pek. Pas. Downlight 9 Watt set 72.00 109,250.00 7,866,000.00
6 Pek Pas Lampu SL 9 Watt set 1.00 51,750.00 51,750.00
7 Pek. Instalasi 1 Titik KK ttk 30.00 183,755.00 5,512,650.00
8 Pek Pas Kotak Kontak AC bh 9.00 54,000.00 486,000.00
9 Pek. Pas. Kotak Kontak bh 30.00 14,400.00 432,000.00
10 Pek. Pas. Saklar Tunggal bh 9.00 13,225.00 119,025.00
11 Pek. Pas. Saklar Ganda bh 19.00 17,250.00 327,750.00
12 Pek. Pas. Saklar Hotel bh 2.00 17,250.00 34,500.00
Jumlah 37,132,087.00
HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6

3 PEKERJAAN BANGUNAN LANTAI III


3.1 PEKERJAAN URUGAN
1 Pekerjaan Urugan Pasir Alas Lantai T = 3 cm m3 18.12 147,600.00 2,674,512.00
Jumlah 2,674,512.00

3.2 PEKERJAAN BETON


1 Pekerjaan Beton Kolom K.1 30/30 K.225 m3 16.80 3,983,500.00 66,922,800.00
2 Pekerjaan Beton Kolom K2 25/25 K.225 m3 3.96 3,930,800.00 15,565,968.00
3 Pekerjaan Beton Kolom KP 12/12 K.175 m3 2.19 5,776,500.00 12,643,603.20
4 Pekerjaan Beton Balok B.1 25/50 K.225 m3 16.80 3,678,530.00 61,799,304.00
5 Pekerjaan Beton Balok B.2 20/35 K.225 m3 16.56 3,825,340.00 63,347,630.40
6 Pekerjaan Beton Balok B.3 20/30 K.225 m3 15.00 4,026,670.00 60,400,050.00
7 Pekerjaan Beton Balok BL.2 15/20 K.176 m3 1.20 3,896,400.00 4,675,680.00
8 Pekerjaan Beton Plat Dak Topi Tebal 10cm m3 3.00 3,842,500.00 11,527,500.00
Jumlah 296,882,535.60

3.3 PEKERJAAN DINDING DAN PLESTERAN


1 Pekerjaan Dinding 1/2 Bata adukan 1:5 m2 994.04 89,900.00 89,363,746.50
2 Pekerjaan Plesteran Adukan 1:5 m2 1,988.07 38,100.00 75,745,467.00
3 Pekerjaan Plesteran Kolom Adukan 1:3 m2 29.95 41,600.00 1,246,003.20
4 Pekerjaan Acian m2 2,018.02 22,800.00 46,010,901.60
Jumlah 212,366,118.30

3.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA


1 Pekerjaan Kusen Pintu Dan Jendela Kayu jati m3 0.69 14,879,100.00 10,207,062.60
2 Pekerjaan Daun Pintu Kayu Jati m2 16.40 743,600.00 12,195,040.00
3 Pekerjaan Daun Jendela Kayu Jati m2 6.38 500,700.00 3,196,468.80
4 Pekerjaan Kusen dan Daun Pintu Km unit 9.00 750,000.00 6,750,000.00
5 Pekerjaan Kaca 5mm m2 4.20 84,300.00 354,060.00
6 Pas. Loster Beton bh 54.00 30,000.00 1,620,000.00
7 Pas. Glass Blok bh 54.00 25,000.00 1,350,000.00
Jumlah 35,672,631.40

3.5 PEKERJAAN ATAP DAN PLAFOND


1 Pekerjaan Rangka Plafond Usuk 6 / 6 cm m2 362.40 76,300.00 27,651,120.00
2 Pekerjaan Plafond Gypsum m2 362.40 38,100.00 13,807,440.00
3 Pekerjaan Lyst Plafond Gyfsum 15 cm m1 543.60 15,000.00 8,154,000.00
4 Pas. Kuda Kuda Kayu Lokal Kls II m3 10.36 6,052,400.00 62,677,201.82
5 Pas. Rangka Atap Kayu Lokal Kls II m2 634.80 60,700.00 38,532,360.00
6 Pas. Penutup Atap Sirap m2 634.80 247,000.00 156,795,600.00
7 Pas. Lisplank Kayu Lokal Kls II m1 634.80 49,300.00 31,295,640.00
Jumlah 338,913,361.82

3.6 PEKERJAAN ALAT PENGGANTUNG


1 Pas.Engsel Pintu bh 30.00 31,500.00 945,000.00
2 Pas.Engsel Jendela bh 20.00 22,100.00 442,000.00
3 Pas.Kunci Pintu set 10.00 133,500.00 1,335,000.00
4 Pas.Hak Angin bh 20.00 27,300.00 546,000.00
5 Pas.Slot Jendela bh 20.00 26,600.00 532,000.00
Jumlah 3,800,000.00

3.7 PEKERJAAN LANTAI


1 Pekerjaan Lantai Kramik 60x60cm Warna/Corak m2 330.81 237,300.00 78,501,213.00
2 Pekerjaan Lantai Kramik 30x30cm Warna/Corak Anti Slip (Toilet) m2 54.00 182,500.00 9,855,000.00
3 Pekerjaan Dinding Kramik 30x60cm Warna/Corak (Toilet) T.200cm m2 165.60 237,300.00 39,296,880.00
4 Pekerjaan Dinding Kramik Plint 10 x 60 cm Warna/Corak m2 18.00 237,300.00 4,271,400.00
Jumlah 131,924,493.00

3.8 PEKERJAAN PENGECATAN


1 Pekerjaan Cat Dinding sek. Dulux m2 1,988.07 29,700.00 59,045,679.00
2 Pekerjaan Cat Plafond Sek. Catylac m2 362.40 24,100.00 8,733,840.00
3 Pekerjaan Melamic Kayu m2 40.21 105,100.00 4,225,860.80
Jumlah 72,005,379.80
HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA SATUAN
Rp. Rp.
1 2 3 4 5 6

3.9 PEKERJAAN SANITASI


1 Pekerjaan Pemasangan Kloset Duduk bh 9.00 3,046,700.00 27,420,300.00
2 Pekerjaan Instalasi Air Bersih Pipa PVC Ø1/2" m1 80.00 16,900.00 1,352,000.00
3 Pekerjaan Instalasi Air Bersih Pipa PVC Ø3/4" m1 50.00 22,500.00 1,125,000.00
4 Pekerjaan Instalasi Air Kotor Pipa PVC Ø3" m1 80.00 82,400.00 6,592,000.00
5 Pekerjaan Instalasi Air Kotor Pipa PVC Ø4" m1 80.00 99,400.00 7,952,000.00
6 Pekerjaan Pasangan Floor Drain bh 9.00 38,600.00 347,400.00
7 Pekerjaan Pasangan Kran Air Kran Biasa bh 9.00 40,900.00 368,100.00
8 Pekerjaan Pasangan Kran Shower bh 9.00 350,000.00 3,150,000.00
9 Pekerjaan Pasangan Kran Jet Washer bh 9.00 250,000.00 2,250,000.00
10 Pekerjaan Pasangan Kran panas dingin bh 6.00 500,000.00 3,000,000.00
11 Pekerjaan Pasangan Wastafel Lengkap Cermin unit 9.00 1,908,600.00 17,177,400.00
Jumlah 70,734,200.00

3.10 PEKERJAAN INSTALASI LISTRIK


1 Pekerjaan Pemasangan Panel SDP set 1.00 2,449,040.00 2,449,040.00
2 Pemasangan Kabel NYY 4x16 mm² dari APP ke MDP m1 20.00 126,500.00 2,530,000.00
3 Pemasangan Kabel NYY 4x10 mm² dari MDP ke SDP m1 20.00 89,870.00 1,797,400.00
4 Pek. Instalasi 1 Titik cahaya ttk 84.00 184,833.00 15,525,972.00
5 Pek. Pas. Downlight 9 Watt set 72.00 109,250.00 7,866,000.00
6 Pek Pas Lampu SL 9 Watt set 1.00 51,750.00 51,750.00
7 Pek. Instalasi 1 Titik KK ttk 30.00 183,755.00 5,512,650.00
8 Pek Pas Kotak Kontak AC bh 9.00 54,000.00 486,000.00
9 Pek. Pas. Kotak Kontak bh 30.00 14,400.00 432,000.00
10 Pek. Pas. Saklar Tunggal bh 9.00 13,225.00 119,025.00
11 Pek. Pas. Saklar Ganda bh 19.00 17,250.00 327,750.00
Jumlah 37,097,587.00
NO URAIAN PEKERJAAN

1 2

A. PEKERJAAN PERSIAPAN
1 Pekerjaan Papan Nama Kegiatan/Banner
2 Pekerjaan Pengukuran dan Pasangan Bouwplank
3 Pekerjaan Esteger Bambu
4 Pekerjaan Esteger Skapolding
5 Pekerjaan Pengadaan Air Kerja
6 Pekerjaan Pengadaan Direksikeet
7 Pekerjaan Pembuangan dan Pembersihan Sisa Pekerjaan
8 Mobilisasi dan Demobilisasi Bahan dan Peralatan Kerja
9 Quality Control
10 Pagar Pengaman Pekerjaan (Keliling Lokasi Pekerjaan)
11 Administrasi Dokumentasi dan Pelaporan

B. PEKERJAAN KONSTRUKSI
1 PEKERJAAN BANGUNAN LANTAI BAWAH
1.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan Galian Tanah Pondasi Batu Kali

2 Pekerjaan Galian Tanah Pondasi Plat Beton

3 Pekerjaan Urugan Tanah Kembali Bekas Galian Pondasi Batu Kali


4 Pekerjaan Urugan Tanah Kembali Bekas Galian Pondasi Plat Beton
5 Pekerjaan Urugan Sirtu Peninggian Lantai Bangunan

6 Pekerjaan Urugan Pasir Alas Pondasi Batu Kali

7 Pekerjaan Urugan Pasir Alas Pondasi Plat Beton


8 Pekerjaan Urugan Pasir Alas Lantai

1.2 PEKERJAAN PONDASI DAN BETON


1 Pekerjaan Aan Stamping Batu Kali

2 Pekerjaan Pondasi Batu Kali 1:5

3 Pekerjaan Pondasi Plat Beton P1 Ukuran 200 X 200 K.225

4 Pekerjaan Pondasi Plat Beton P2 Ukuran 200 X 200 K.225

Pekerjaan Pondasi Plat Beton P3 Ukuran 150 X 150 K.226

5 Pekerjaan Beton Sloof Beton ( SL1 ) 20/30 K.225


Pekerjaan Beton Sloof Beton ( SL2 ) 15/25 K.225
Pekerjaan Beton Sloof Beton ( SL3 ) 15/20 K.225

1 Pekerjaan Beton Kolom K.1 30/50 K.225


2 Pekerjaan Beton Kolom K2 30/30 K.225
3 Pekerjaan Beton Kolom K3 20/20 K.175
4 Pekerjaan Beton Kolom KP 12/12 K.175

1 Pekerjaan Beton Balok B.1 30/50 K.225


2 Pekerjaan Beton Balok B.2 30/40 K.225
3 Pekerjaan Beton Balok B.3 20/30 K.225
4 Pekerjaan Beton Balok B.4 15/25 K.225
5 Pekerjaan Beton Balok B.5 20/30 K.225
6 Pekerjaan Beton Balok B.6 15/20 K.175
7 Pekerjaan Beton Balok BL.2 15/20 K.176

1 Pekerjaan Beton Plat Lantai Tebal 12cm


2 Pekerjaan Beton Plat Lantai Tangga dan Bordes Tebal 15cm
3 Pekerjaan Beton Balok Bordes 15/25 K.225
4 Pekerjaan Beton Plat Dak Topi Tebal 10cm
5 Pekerjaan Beton Meja dapur Tebal 10cm
6 Pekerjaan Lantai Kerja Pondasi Plat Beton
1.3 PEKERJAAN DINDING DAN PLESTERAN
1 Pekerjaan Lubang kusen

2 Pekerjaan Dinding 1/2 Bata adukan 1:5


3 Pekerjaan Dinding 1 Bata adukan 1:3
4 Pekerjaan Dinding Batu Alam Type Garis Ukuran 20x40cm
5 Pekerjaan Plesteran dan Acian Dinding Adukan 1:3
6 Pekerjaan Plesteran dan Acian Dinding Adukan 1:5
7 Pekerjaan Plesteran dan Acian Kolom Adukan 1:3
8 Pekerjaan Plesteran+ Acian Dinding (Opening Kusen) Adukan 1:5
9 Pekerjaan Profilan

1.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA


1 Pekerjaan Kusen Pintu Jendela Aluminium Warna 4"

2 Pekerjaan Daun Pintu Kaca Frameless 12mm (pintu depan) lengkap


3 Pekerjaan Daun Pintu Kaca Aluminium Warna

1 Pekerjaan Kusen Pintu Dan Jendela Kayu Jati

2 Pekerjaan Daun Pintu Kayu Lokal Kelas II


3 Pekerjaan Daun Jendela Kayu Lokal Kelas II
4 Pekerjaan Kaca 5mm
1.5 PEKERJAAN PLAFOND
1 Pekerjaan Rangka Plafond Usuk 6 / 6 cm + Gypsum
2 Pekerjaan Lyst Plafond Gyfsum 15 cm

1.6 PEKERJAAN ALAT PENGGANTUNG DAN BESI


1 Pekerjaan Door Closer
2 Pas.Engsel Pintu
3 Pas.Engsel Jendela
4 Pas.Kunci Pintu
5 Pas.Hak Angin
6 Pas.Slot Jendela

1.7 PEKERJAAN LANTAI


1 Pekerjaan Lantai Kramik 40x40cm Warna/Corak (Ruangan)

2 Pekerjaan Lantai Kramik 33x33cm Warna/Corak Anti Slip (Toilet)

3 Pekerjaan Lantai Kramik 40x40cm Warna/Corak (Teras)

4 Pekerjaan Dinding Kramik 25x60cm Warna/Corak (Toilet) T.180cm

5 Pekerjaan Dinding Kramik Plint 10 x 40 cm Warna/Corak

1.8 PEKERJAAN PENGECATAN


1 Pekerjaan Cat Dinding sek. ICI
2 Pekerjaan Cat Plafond Sek. Vinilek
3 Pekerjaan Cat Kayu

1.9 PEKERJAAN SANITASI


1 Pekerjaan Pemasangan PDAM
2 Pekerjaan Pemasangan Penampung Air Stainless Kap 1600 Liter
3 Pekerjaan Perengkapan Otomatis
4 Pekerjaan Septictank dan Resapan
5 Pekerjaan Pemasangan Kloset Jongkok
6 Pekerjaan Pemasangan Kloset Duduk
7 Pekerjaan Pemasangan BathThub
8 Pekerjaan Instalasi Air Bersih Pipa PVC @1/2"
9 Pekerjaan Instalasi Air Bersih Pipa PVC @3/4"
10 Pekerjaan Instalasi Air Bersih Pipa PVC @1"
11 Pekerjaan Instalasi Air Kotor Pipa PVC @1,5"
12 Pekerjaan Instalasi Air Kotor Pipa PVC @3"
13 Pekerjaan Instalasi Air Kotor Pipa PVC @4"
14 Pekerjaan Instalasi Air Hujan Pipa PVC @4" Dari Dak Beton
15 Pekerjaan Pasangan Gravel 1/2 @20 cm
16 Pekerjaan Pasangan Floor Drain
17 Pekerjaan Pasangan Kran Air Kran Biasa
18 Pekerjaan Pasangan Kran Shower
19 Pekerjaan Pasangan Wastafel Lengkap Cermin
20 Pekerjaan Pasangan Kran Leher Angsa

1.10 PEKERJAAN INSTALASI LISTRIK


1 Pekerjaan Penambahan Daya
2 Pekerjaan Pemasangan Panel MDP
3 Pekerjaan Pemasangan Panel SDP
4 Pemasangan Kabel NYY 4x16 mm² dari APP ke MDP
5 Pemasangan Kabel NYY 4x10 mm² dari MDP ke SDP
6 Pemasangan Grounding
7 Pek. Instalasi 1 Titik cahaya
8 Pek. Pas Lampu RMI 2x36w
9 Pek. Pas. Lampu RMI 2x18w
10 Pek. Pas. Baret 19w
11 Pek. Pas. Downlight 9 Watt
12 Pek Pas Lampu SL 9 Watt
13 Pek. Instalasi 1 Titik KK
14 Pek Pas Kotak Kontak AC
15 Pek. Pas. Kotak Kontak
16 Pek Instalasi Outlet Lantai
17 Pek. Pas. Outlet Lantai (KK dan Data)
18 Pek. Pas. Saklar Tunggal
19 Pek. Pas. Saklar Ganda
20 Pek. Pas. Saklar Hotel

1.11 PEKERJAAN PENANGKAL PETIR


1 Pemasangan Kawat BC 35 mm
2 Pemasangan Finial Petir
3 Pemasangan Grounding

1.12 PEKERJAAN SALURAN DATA DAN TELEPON


1 PekTitik Data
2 Pek. Pas Outlet Data
3 PekTitik telepon
4 Pek. Pas Outlet telepon

1.13 PEKERJAAN LAIN-LAIN


1 Pekerjaan Pemasangan Logo Kota Banjar
2 Pekerjaan Pemasangan Hurup Stainless t =15 cm
3 Pekerjaan Pemasangan Hurup Stainless t =25 cm

2 PEKERJAAN BANGUNAN LANTAI II


2.1 URUGAN
1 Pekerjaan Urugan Pasir Alas Lantai

2.2 PEKERJAAN BETON


1 Pekerjaan Beton Kolom K.1 30/50 K.225
2 Pekerjaan Beton Kolom K2 30/30 K.225
3 Pekerjaan Beton Kolom K3 20/20 K.175
4 Pekerjaan Beton Kolom KP 12/12 K.175

1 Pekerjaan Beton Balok B.1 25/50 K.225


2 Pekerjaan Beton Balok B.2 20/35 K.225
3 Pekerjaan Beton Balok B.3 20/30 K.225
4 Pekerjaan Beton Balok B.4 15/25 K.225
5 Pekerjaan Beton Balok B.5 20/30 K.225
6 Pekerjaan Beton Balok B.6 15/20 K.175
7 Pekerjaan Beton Balok BL.2 15/20 K.176

1 Pekerjaan Beton Plat Dak Tebal 12cm


2 Pekerjaan Beton Plat entrance Tebal 10cm
3 Pekerjaan Beton Plat Lantai Tangga dan Bordes Tebal 15cm
4 Pekerjaan Beton Balok Bordes 15/25 K.225
5 Pekerjaan Beton Plat Dak Topi Tebal 10cm
6 Pekerjaan Beton Profil Kusen Tebal 10cm
7 Pekerjaan Lantai Kerja Pondasi Plat Beton

2.3 PEKERJAAN DINDING DAN PLESTERAN


1 Pekerjaan Lubang kusen
2 Pekerjaan Dinding 1/2 Bata adukan 1:5
3 Pekerjaan Dinding 1 Bata adukan 1:3
4 Pekerjaan Dinding Batu Alam Type Garis Ukuran 20x40cm
5 Pekerjaan Plesteran dan Acian Dinding Adukan 1:3
6 Pekerjaan Plesteran dan Acian Dinding Adukan 1:5
7 Pekerjaan Plesteran dan Acian Kolom Adukan 1:3
8 Pekerjaan Plesteran+ Acian Dinding (Opening Kusen) Adukan 1:5
9 Pekerjaan Profilan

2.4 PEKERJAAN KUSEN PINTU JENDELA DAN KACA


1 Pekerjaan Kusen Pintu Jendela Aluminium Warna 4"

2 Pekerjaan Kusen Pintu Dan Jendela Kayu Jati

3 Pekerjaan Daun Pintu Kayu Lokal Kelas II


4 Pekerjaan Daun Jendela Kayu Lokal Kelas II
5 Pekerjaan Kaca 5mm (Kaca Mati)

2.5 PEKERJAAN PLAFOND


1 Pekerjaan Rangka Plafond Usuk 6 / 6 cm + Gypsum
2 Pekerjaan Lyst Plafond Gyfsum 15 cm

2.6 PEKERJAAN ALAT PENGGANTUNG DAN BESI


1 Pekerjaan Door Closer
2 Pas.Engsel Pintu
3 Pas.Engsel Jendela
4 Pas.Kunci Pintu
5 Pas.Hak Angin
6 Pas.Slot Jendela

1 Pekerjaan Door Closer

2.7 PEKERJAAN LANTAI


1 Pekerjaan Lantai Kramik 40x40cm Warna/Corak (Ruangan)

2 Pekerjaan Lantai Kramik 33x33cm Warna/Corak Anti Slip (Toilet)

3 Pekerjaan Lantai Kramik 40x40cm Warna/Corak (Teras)

4 Pekerjaan Dinding Kramik 25x60cm Warna/Corak (Toilet) T.180cm

5 Pekerjaan Dinding Kramik Plint 10 x 40 cm Warna/Corak

1 Pekerjaan Dinding Kramik Tangga 30 x 30 cm Anti Slip

2.8 PEKERJAAN PENGECATAN


1 Pekerjaan Cat Dinding sek. ICI
2 Pekerjaan Cat Plafond Sek. Vinilek
3 Pekerjaan Cat Kayu
4 Pekerjaan Cat Batu (Coating batu bergaris)

2.9 PEKERJAAN SANITASI


1 Pekerjaan Pemasangan PDAM
2 Pekerjaan Pemasangan Penampung Air Stainless Kap 1600 Liter
3 Pekerjaan Perengkapan Otomatis
4 Pekerjaan Septictank dan Resapan
5 Pekerjaan Pemasangan Kloset Jongkok
6 Pekerjaan Pemasangan Kloset Duduk
7 Pekerjaan Pemasangan BathThub
8 Pekerjaan Instalasi Air Bersih Pipa PVC @1/2"
9 Pekerjaan Instalasi Air Bersih Pipa PVC @3/4"
10 Pekerjaan Instalasi Air Bersih Pipa PVC @1"
11 Pekerjaan Instalasi Air Kotor Pipa PVC @1,5"
12 Pekerjaan Instalasi Air Kotor Pipa PVC @3"
13 Pekerjaan Instalasi Air Kotor Pipa PVC @4"
14 Pekerjaan Instalasi Air Hujan Pipa PVC @4" Dari Dak Beton
15 Pekerjaan Pasangan Gravel 1/2 @20 cm
16 Pekerjaan Pasangan Floor Drain
17 Pekerjaan Pasangan Kran Air Kran Biasa
18 Pekerjaan Pasangan Kran Shower
19 Pekerjaan Pasangan Kran Jet Washer
20 Pekerjaan Pasangan Wastafel Lengkap Cermin
21 Pekerjaan Pasangan Kran Leher Angsa

2.10 PEKERJAAN INSTALASI LISTRIK


1 Pek. Instalasi 1 Titik cahaya
2 Pek. Pas Lampu RMI 2x36w
3 Pek. Pas. Lampu RMI 2x18w
4 Pek. Pas. Downlight 9 Watt
5 Pek Pas Lampu SL 9 Watt
6 Pek. Instalasi 1 Titik KK
7 Pek Pas Kotak Kontak AC
8 Pek. Pas. Kotak Kontak
9 Pek. Pas. Saklar Tunggal
10 Pek. Pas. Saklar Ganda

KUDA KUDA
RANGKA ATAP
Lisplank
PANJANG LBR TINGGI JUMLAH JUMLAH VOL SAT

1.00 LS
122 122.00 M'
92.00 M2
- M2
1.00 LS
1.00 LS
1.00 LS
- LS
- LS
1.00 LS
1.00 LS

19 0.8 0.8 1 12.16 12.16


12.16 m3

P1 2.2 2.2 2 28 9.68 271.04


P2 2.1 2.1 2 11 8.82 97.02
P3 1.7 1.7 2 0 5.78 0
P4 1.6 1.6 2 0 5.12 0
P5 2.1 2.1 2 0 8.82 0
368.06 m3

9.12 m3
276.045 m3
44.9 8.00 0.5 1 179.60 179.60 m3

19 0.8 0.05 1 0.76 0.76


0.76 m3

P1 2.2 2.2 0.05 28 0.242 6.776


P2 2.1 2.1 0.05 11 0.2205 2.4255
P3 1.7 1.7 0.05 0 0.1445 0
P4 1.6 1.6 0.05 0 0.128 0
P5 2.1 2.1 0.05 0 0.2205 0
9.20 m3

44.9 8.00 0.05 1 17.96 17.96 m3

19 0.8 0.15 1 2.28 2.28


2.28 m3

19 0.45 0.6 1 5.13 5.13


5.13 m3

2 2 0.25 28 1 28.00
1.15 1.15 0.3 28 0.39675 11.11 39.11 m3
2 2 0.25 11 1 11.00
1.15 1.15 0.3 11 0.39675 4.36 15.36 m3
1.5 1.5 0.25 0 0.5625 -
0.9 0.9 0.3 0 0.243 0.00 - m3

246.7 0.2 0.3 1 14.802 14.80 m3


21 0.15 0.25 0 0.7875 0.00 m3
19 0.15 0.2 0 0.57 0.00 m3

6.1 0.3 0.5 28 0.915 25.62 25.62 m3


6.1 0.3 0.3 11 0.549 6.039 6.04 m3
6.1 0.2 0.2 0 0.244 0 0.00 m3
4.3 0.12 0.12 0 0.062 0 0.00 m3

8 0.3 0.5 14 1.200 16.8 16.80 m3


138 0.3 0.4 1 16.560 16.56 16.56 m3
0 0.2 0.3 0 0.000 0 0.00 m3
27.87 0.15 0.25 0 1.045 0 0.00 m3
3 0.2 0.3 0 0.180 0 0.00 m3
19 0.15 0.2 0 0.570 0 0.00 m3
40 0.15 0.2 1 1.200 1.2 1.20 m3

45.3 8 0.12 1 43.488 43.488 43.49 m3


10 1.1 0.12 2 1.32 2.64 2.64 m3
4.15 0.15 0.25 2 0.16 0.31 0.31 m3
40 0.6 0.1 1 2.40 2.40 2.40 m3
10 0.75 0.1 1 0.75 0.75 0.75 m3

P1 2.2 2.2 0.05 28 0.242 6.776


P2 2.1 2.1 0.05 11 0.2205 2.4255
P3 1.7 1.7 0.05 0 0.1445 0
P4 1.6 1.6 0.05 0 0.128 0
P5 2.1 2.1 0.05 0 0.2205 0
9.20 m3

P1 0.9 2.05 0 1.845 -


P2 1.2 2.5 0 3 -
P3 0.9 2.05 3 1.845 5.54
P4 1.3 2.05 0 2.665 -
P5 0.7 2.05 0 1.435 -
J1 0.6 1.5 7 0.9 6.30
J2 0.6 2.5 0 1.5 -
J4 0.5 1.6 0 0.8 -

11.84 m2

101.5 4.1 1 416.15 416.15


426.32 m2

852.63 m2
1.2 3.12 11 3.744 41.184 41.18 m2

j1 10.2 0 0
j2 6.2 0 0
p2 5.6 0 0
j5 4.2 0 0
0 m1

2 2.5 0 5 0 0 m2
0.6 2 0 1.2 0 0 m2

P3 5.2 0.14 0.05 3 0.0364 0.1092


P4 5.6 0.14 0.05 0 0.0392 0
J4 4.8 0.14 0.05 7 0.0336 0.2352
0.34 m3

0.82 2 3 1.64 4.92 4.92 m2


0.42 1.52 7 0.6384 4.4688 4.47 m2

1.52 1.3 0 1.976 0


0.52 2.42 0 1.2584 0
0.3 1.38 7 0.414 2.898
2.90 m2

362.4 m2
271.80 m1

0
9
14
3
7
7

52.35 1 52.35
85.36 0 0
0 3 0
38.06 0 0
362.4 m2
9.02 0 0
6.94 0 0
0 m2
30.64 0 0
4.05 0 0
0 m2
6.36 0 0
3 0 0
0 m2
203 0.4 0.1 0 20.3 20.3 m2

893.81 m2
362.4 m2
P3 4.8 0.24 0 3 1.152 3.456
P4 5.2 0.24 0 0 1.248 0
J4 4 0.24 0 7 0.96 6.72
pintu 2 0.82 3 1.64 4.92
jrndela 3.84 0.07 7 0.2688 1.8816
16.98 m2
6
1
2
1
13
3
24
60
92
12 13.20
21 23.10
15 16.50
0

2
3
2
0
2

53

43
6
10
4
10

5
14
2
1

45.3 8 0.05 1 18.12 18.12 18.12 m3

4 0.3 0.5 28 0.6 16.8 16.80 m3


4 0.3 0.3 11 0.360 3.96 3.96 m3
3.5 0.2 0.2 0 0.140 0 0.00 m3
4 0.12 0.12 38 0.058 2.1888 2.19 m3

8 0.3 0.5 14 1.200 16.8 16.80 m3


138 0.3 0.4 1 16.560 16.56 16.56 m3
78.79 0.2 0.3 0 4.727 0 0.00 m3
28 0.15 0.25 0 1.050 0 0.00 m3
21 0.2 0.3 0 1.260 0 0.00 m3
45.3 0.15 0.2 0 1.359 0 0.00 m3
40 0.15 0.2 1 1.200 1.2 1.20 m3

45.3 8 0.12 1 43.488 43.488 57.82 m3


10 1.1 0.12 0 1.32 - 0.00 m3
10 0.15 0.25 2 0.38 0.75 0.75 m3
4.15 0.6 0.1 1 0.25 0.25 0.25 m3
40 0.75 0.1 1 3.00 3.00 3.00 m3
17.2 0.3 0.1 0 0.52 - - m3
7.4 0.3 0.1 0 0.222 0 -
0.6 0.3 0.1 0 0.018 0 -
-
P1 2 2.5 0 5 -
P2 1.2 2.5 0 3 -
P3 0.9 2.05 10 1.845 18.45
P4 1.3 2.05 0 2.665 -
P5 0.7 2.05 9 1.435 12.92
J1 1.59 2.7 0 4.293 -
J2 0.6 2.5 0 1.5 -
J3 5.3 2.5 0 13.25 -
J4 0.6 1.5 10 0.9 9.00

40.37 m2

258.6 4 1 1034.4 1034.4


994.04 m2

1,988.07 m2
1.2 3.12 8 3.744 29.952 29.95 m2

107.00 m1

41 0 0
6.2 0 0
6.3 0 0
0 m1

P3 5.2 0.14 0.05 10 0.0364 0.364


P4 5.6 0.14 0.05 0 0.0392 0
J4 4.6 0.14 0.05 10 0.0322 0.322
0.69 m3

0.82 2 10 1.64 16.4 16.4 m2


0.42 1.52 10 0.6384 6.384 6.38 m2

1 2.4 0 2.4 0
0.5 2.4 0 1.2 0
0.3 1.4 10 0.42 4.2
4.20 m2

362.4 m2
543.60 m1

30
20
10
20
20

23.2 4 92.8
29.85 1 29.85
36.6 1 36.6
17.25 0 0
9 0 0
330.81 m2
3 2 9 6 54
6.94 0 0
54 m2
93.67 1 93.67
16.23 0 0
93.67 m2
9.2 2 9 18.4 165.6
18.6 0 0
165.6 m2
30 0.6 0.1 10 1.8 18
23.6 0.6 0.1 1 2.36
21.6 0.6 0.1 4 2.16
82.9 0.6 0.1 1 8.29
18.00 m2

1.5 0.3 40 0.45 18 24.13 m2

1,988.07
362.4
P3 4.8 0.24 0 10 1.152 11.52
P4 5.2 0.24 0 0 1.248 0
J4 4 0.24 0 10 0.96 9.6
pintu 2 0.82 10 1.64 16.4
jrndela 3.84 0.07 10 0.2688 2.688
40.21 m2

6
1

9
0
80
50
0
12 0
24 80
24 80
0

9
9
9
9
9

84

11
8 9 72
1
30
9
30
9
19

18.74
#REF!
b.tarik 8.25 0.08 0.12 0.0792
kaki 9.2 0.08 0.12 0.08832
ander 2.5 0.08 0.12 0.024
skoor 6 0.08 0.12 0.0576
gapit 12.6 0.06 0.12 0.09072
sl.angin 12 0.06 0.12 0.0864
sl.gempa 12 0.06 0.12 0.0864
15 0.51264 7.69
gording 52.9 0.06 0.12 7 0.38088 2.67
10.36 m3

52.9 12 1 634.8 634.8 634.8


52.9 2 105.8
662.4 21.09 12.89 33.98 628.42
112 250

8.5 0.15 0.2 0.255


90 36.3 36.3 20 36 40 258.6
NO TGL PEKERJAAN KET
1 22/7/2013 Pekerjaan Kusen
2 29/7/2013 Pembesian
3 19/8/2013
Bongkaran Bang.Existing
22/8/2013
4 23/8/2013
LIBUR
24/8/2013
5 25/8/2013 Galian Dan Pasangan