Anda di halaman 1dari 98

CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

: ……………………………….
: Pembangunan Perpustakaan
BESI BETON POLOS BESI BETON SP

No Diameter Berat Besi No Diameter Berat Besi No.


mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1


2 5.0 0.12 12 13 1.04 2
3 5.5 0.19 13 14 1.21 3
4 5.7 0.20 14 16 1.58 4
5 6.0 0.22 15 19 2.23 5
6 6.5 0.31 16 22 2.98 6
7 8.0 0.40 17 23 3.26 7
8 9.0 0.53 18 25 3.85 8
9 10.0 0.62 19 28 4.83 9
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3

1. Sloof 15 X 18 cm' pakai tulangan 6 batang dia. 10 beugel dia. 8 jarak 15 cm


Panjang 1 m3 ukuran 15 x 18 cm= ( 1 : 0.15 : 0.18 ) =
Besi 6 batang dia. 10 = 6 x 37,04 x 0,62 kg =
Besi beugel dia. 8 jarak 15 mm = ( 137,78 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,18 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 15 x 18 CM1 DALAM 1 M3 =

Sloof 15 X 18 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm


Panjang 1 m3 ukuran 15 x 18 cm= ( 1 : 0.15 : 0.18 ) =
Besi 4 batang dia. 12 = 4 x 37,04 x 0,62 kg =
Besi beugel dia. 8 jarak 15 mm = ( 137,78 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,18 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 15 x 18 CM1 DALAM 1 M3 =

2. Sloof 20 X 30 cm' pakai tulangan 6 batang dia. 16 beugel dia. 8 jarak 15 cm


Panjang 1 m3 ukuran 20 x 30 cm= ( 1 : 0.20 : 0.30 ) =
Besi 6 batang dia. 16 = 6 x 16,67 x 1.04 kg =
Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0,15 ) x ( 2 x 0,20 ) + ( 2 x 0,30 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 20 x 30 CM1 DALAM 1 M3 =


180000
3. Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 10 x 10 cm= ( 1 : 0.12 : 0.12 ) =
Besi 4 batang dia. 10 = 4 x 69,44 x 0,62 kg =
Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,15 ) x ( 4 x 0,12 ) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 12 x 12 CM1 DALAM 1 M3 =

4. Kolom Beton 13 X 18 cm' pakai tulangan 6 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 13 x 18 cm= ( 1 : 0.13 : 0.18 ) =
Besi 6 batang dia. 10 = 6 x 42,74 x 0,62 kg =
Besi beugel dia. 8 jarak 15 mm = ( 42,74 : 0,15 ) x ( 2 x 0,13 ) + ( 2 x 0,18 ) x 0,40 kg =

BERAT BESI BETON UNTUK 13 x 18 CM1 DALAM 1 M3 =

4.a Kolom Beton 15 X 30 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 30 cm= ( 1 : 0.15 : 0.30 ) =
Besi 6 batang dia. 12 = 6 x 22,22 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 22,22 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,30 ) x 0,40 kg =

BERAT BESI BETON UNTUK 15 x 30 CM1 DALAM 1 M3 =

5. Kolom 18 X 18 cm' pakai tulangan 6 batang dia. 10 beugel dia. 8 jarak 15 cm


Panjang 1 m3 ukuran 18 x 18 cm= ( 1 : 0.18 : 0.18 ) =
Besi 6 batang dia. 10 = 6 x 30,86 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 30,86 : 0,15 ) x ( 4 x 0,18 ) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 18 x 18 CM1 DALAM 1 M3 =

Kolom 18 X 18 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm


Panjang 1 m3 ukuran 18 x 18 cm= ( 1 : 0.18 : 0.18 ) =
Besi 4 batang dia. 10 = 4 x 30,86 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 30,86 : 0,15 ) x ( 4 x 0,18 ) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 18 x 18 CM1 DALAM 1 M3 =


6. Kolom 20 X 20 cm' pakai tulangan 6 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 20 cm= ( 1 : 0.20 : 0.20 ) =
Besi 6 batang dia. 12 = 6 x 25,00 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 25,00 : 0,15 ) x ( 4 x 0,20 ) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 20 x 20 CM1 DALAM 1 M3 =

7. Kolom 20 X 20 cm' pakai tulangan 4 batang dia. 16 2 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 20 cm= ( 1 : 0.20 : 0.20 ) =
Besi 4 batang dia. 16 = 4 x 25,00 x 1,58 kg =
Besi 2 batang dia. 12 = 2 x 25,00 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 25,00 : 0,15 ) x ( 4 x 0,20 ) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 20 x 20 CM1 DALAM 1 M3 =

7. Kolom 20 X 20 cm' pakai tulangan 4 batang dia. 16 8 jarak 15 cm


Panjang 1 m3 ukuran 20 x 20 cm= ( 1 : 0.20 : 0.20 ) =
Besi 4 batang dia. 16 = 4 x 25,00 x 1,58 kg =
Besi beugel dia. 8 jarak 15 mm = ( 25,00 : 0,15 ) x ( 4 x 0,20 ) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 20 x 20 CM1 DALAM 1 M3 =

Kolom 15 X 15 cm' pakai tulangan 4 batang dia. 10 8 jarak 15 cm


Panjang 1 m3 ukuran 15 x 15 cm= ( 1 : 0.15 : 0.15 ) =
Besi 4 batang dia. 10 = 4 x 44.44 x 0.62kg =
Besi beugel dia. 8 jarak 15 mm = ( 44.44 : 0,15 ) x ( 4 x 0,15) x 0, 4kg =

BERAT BESI BETON UNTUK UKURAN 15 x 15CM1 DALAM 1 M3 =

Kolom 15 X 15 cm' pakai tulangan 4 batang dia. 12 8 jarak 15 cm


Panjang 1 m3 ukuran 15 x 15 cm= ( 1 : 0.15 : 0.15 ) =
Besi 4 batang dia. 12 = 4 x 44.44 x 0.89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 44.44 : 0,15 ) x ( 4 x 0,15) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 15 x 15CM1 DALAM 1 M3 =


8. Kolom 20 X 25 cm' pakai tulangan 6 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 25 cm= ( 1 : 0.20 : 0.25 ) =
Besi 6 batang dia. 12 = 6 x 20,00 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = (20,00:0,15)x( 2 x 0,20 )+(2x0,25)x0,40 kg =

BERAT BESI BETON UNTUK UKURAN 20 x 25 CM1 DALAM 1 M3 =

7. Kolom 20 X 20 cm' pakai tulangan 4 batang dia. 12 8 jarak 15 cm


Panjang 1 m3 ukuran 20 x 20 cm= ( 1 : 0.20 : 0.20 ) =
Besi 4 batang dia. 12 = 4 x 25,00 x .89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 25,00 : 0,15 ) x ( 4 x 0,20 ) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 20 x 20 CM1 DALAM 1 M3 =

8. Kolom 15 X 25 cm' pakai tulangan 5 batang dia. 12 beugel dia. 8 jarak 15 cm


Panjang 1 m3 ukuran 15 x 25 cm= ( 1 : 0.15 : 0.25 ) =
Besi 5 batang dia. 12 = 5 x 26,67 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = (26,67:0,15)x(( 2 x 0,15 )+(2x0,25))x0,40 kg =

BERAT BESI BETON UNTUK UKURAN 15 x 25 CM1 DALAM 1 M3 =

9. Kolom 30 X 30 cm' pakai tulangan 8 batang dia. 16 beugel dia. 8 jarak 15 cm


Panjang 1 m3 ukuran 30 x 30 cm= ( 1 : 0.30 : 0.30 ) =
Besi 8 batang dia. 16 = 8 x 11,11 x 1,58 kg =
Besi beugel dia. 8 jarak 15 mm = ( 11,11 : 0,15 ) x ( 4 x 0,30 ) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 30 x 30 CM1 DALAM 1 M3 =

9. Kolom 30 X 30 cm' pakai tulangan 8 batang dia. 16 beugel dia. 8 jarak 15 cm


Panjang 1 m3 ukuran 30 x 30 cm= ( 1 : 0.30 : 0.30 ) =
Besi 8 batang dia. 16 = 8 x 11,11 x 1,58 kg =
Besi beugel dia. 8 jarak 15 mm = ( 11,11 : 0,15 ) x ( 4 x 0,30 ) x 0, 40 kg =

BERAT BESI BETON UNTUK UKURAN 30 x 30 CM1 DALAM 1 M3 =


10. Balok Beton15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm= ( 1 : 0.15 : 0.20 ) =
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3 =

Balok Beton15 X 20 cm' pakai tulangan 6 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm= ( 1 : 0.15 : 0.20 ) =
Besi 6 batang dia. 12 = 6 x 33,33 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3 =

11. Balok Lintel 11 X 11 cm' pakai tulangan 4 batang dia. 10 beugel dia. 6 jarak 15 cm
Panjang 1 m3 ukuran 11 x 11 cm= ( 1 : 0.11 : 0.11 ) =
Besi 4 batang dia. 10 = 4 x 82.64 x 0,62 kg =
Besi beugel dia. 8 jarak 20 cm = ( 60,61 : 0,15 ) x ( 2 x 0,11 ) + ( 2 x 0,15 ) x 0,31 kg =

BERAT BESI BETON UNTUK 11 x 11 CM1 DALAM 1 M3 =

12. Balok 20 X 30 cm' pakai tulangan 5 batang dia. 16 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm= ( 1 : 0.20 : 0.30 ) =
Besi 5 batang dia. 16 = 5 x 16,67 x 1,58 kg =
Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0,15 ) x ( 2 x 0,20 ) + ( 2 x 0,30 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 20 x 30 CM1 DALAM 1 M3 =

12.a Balok 20 X 35 cm' pakai tulangan 5 batang dia. 16 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 35 cm= ( 1 : 0.20 : 0.35 ) =
Besi 6 batang dia. 16 = 6 x 14,29 x 1,58 kg =
Besi beugel dia. 8 jarak 15 mm = ( 14,29 : 0,15 ) x ( 2 x 0,20 ) + ( 2 x 0,35 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 20 x 35 CM1 DALAM 1 M3 =

13. Balok Induk 25 X 55 cm' pakai tulangan 8 batang dia. 19 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 25 x 55 cm= ( 1 : 0.25 : 0.55 ) =
Besi 8 batang dia. 19 = 8 x 7,27 x 2,23 kg =
Besi 2 batang dia. 12 = 2 x 7,27 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 7,27 : 0,15 ) x ( 2 x 0,25 ) + ( 2 x 0,55 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 25 x 55 CM1 DALAM 1 M3 =

14. Balok 30 X 60 cm' pakai tulangan 9 batang dia. 19 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 30 x 60 cm= ( 1 : 0.30 : 0.60 ) =
Besi 9 batang dia. 19 = 9 x 5,56 x 2,23 kg =
Besi 2 batang dia. 12 = 2 x 5.56 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 5,56 : 0,15 ) x ( 2 x 0,30 ) + ( 2 x 0,60 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 30x 60 CM1 DALAM 1 M3 =

Balok 30 X 60 cm' pakai tulangan 10 batang dia. 16 beugel dia. 8 jarak 15 cm


Panjang 1 m3 ukuran 30 x 60 cm= ( 1 : 0.30 : 0.60 ) =
Besi 10 batang dia. 16 = 101,58 x 5,56 x 2,23 kg =
Besi 2 batang dia. 12 = 2 x 5.56 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 5,56 : 0,15 ) x ( 2 x 0,30 ) + ( 2 x 0,60 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 30x 60 CM1 DALAM 1 M3 =

15. Balok 11 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 11 x 15 cm= ( 1 : 0.11 : 0.15 ) =
Besi 4 batang dia. 10 = 4 x 60,61 x 0,62 kg =
Besi beugel dia. 8 jarak 15 mm = ( 60,61 : 0,15 ) x ( 2 x 0,11 ) + ( 2 x 0,15 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 11 x 15 CM1 DALAM 1 M3 =

Balok 15X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15x 15 cm = ( 1 : 0.11 : 0.15 ) =
Besi 4 batang dia. 10 = 4 x 44.44 x 0,62 kg =
Besi beugel dia. 8 jarak 15 mm = ( 44.44 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,15 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 15x 15 CM1 DALAM 1 M3 =

15. Balok 15 X 25 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 11 x 15 cm= ( 1 : 0.15 : 0.25 ) =
Besi 6 batang dia. 12 = 6 x 26.67 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 26.67 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,25 ) x 0, 40 kg =
BERAT BESI BETON UNTUK 15 x 25 CM1 DALAM 1 M3 =

15. Balok 15 X 30 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 30 cm= ( 1 : 0.15 : 0.30 ) =
Besi 6 batang dia. 12 = 6 x 22,22 x 0,89 kg =
Besi beugel dia. 8 jarak 15 mm = ( 22,22 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,30 ) x 0, 40 kg =

BERAT BESI BETON UNTUK 15 x 30 CM1 DALAM 1 M3 =

13. Plat Beton Tebal 12 cm' pakai tulangan beugel 10 jarak 15 cm


Panjang 1 m3 ukuran 100 x 12 c = ( 1 : 0.12 ) =
Besi dia. 10 jarak 15 cm = ( 8.333 : 0.15 ) =
= ( 55.556 x 1 m ) =
= ( 1.00 : 0.15 ) =
= ( 6.667 x 8.333 m ) =

8.333 m Besi beugel dia. 10 jarak 15 mm (55.556 +6.667)*2*0.62 =

BERAT BESI BETON PLAT TB. 12 CM DALAM 1 M3 =

1m
14. Plat Beton Tebal 10 cm' pakai tulangan beugel 10 jarak 15 cm
Panjang 1 m3 ukuran 100 x 10 c = ( 1 : 0.10 ) =
Besi dia. 10 jarak 15 cm = ( 10.00 : 0.15 ) =
= ( 66.667 x 1 m ) =
= ( 1.00 : 0.15 ) =
= ( 10.000 x 6.667 m ) =

10 m Besi beugel dia. 10 jarak 15 mm (66.667 +6.667)*2*0.62 =

BERAT BESI BETON PLAT TB. 10 CM DALAM 1 M3 =

1m
15. List plang Beton Tebal 8 cm' pakai tulangan beugel 10 jarak 20 cm
Panjang 1 m3 ukuran 100 x 8 cm= ( 1 : 0.8 ) =
Besi dia. 10 jarak 15 cm = ( 12.50 : 0.20 ) =
= ( 62.500 x 1 m ) =
= ( 1.00 : 0.20 ) =
= ( 5.000 x 12.500 m ) =

12.5 m Besi beugel dia. 10 jarak 15 mm (62.500 + 6.667)*1*0.62 =

BERAT BESI BETON PLAT TB. 8 CM DALAM 1 M3 =

1m

13. Plat Beton Tebal 12 cm' pakai tulangan beugel 10 jarak 15 cm


Panjang 1 m3 ukuran 100 x 12 c = ( 1 : 0.12 ) =
Besi dia. 8 jarak 15 cm = ( 8.333 : 0.15 ) =
= ( 55.556 x 1 m ) =
= ( 1.00 : 0.15 ) =
= ( 6.667 x 8.333 m ) =

8.333 m Besi beugel dia. 10 jarak 15 mm (55.556 +6.667)*2*0.53 =

BERAT BESI BETON PLAT TB. 12 CM DALAM 1 M3 =

1m
DALAM 1 M3

BESI BETON SPIRAL

Diameter Berat Besi


mm Kg / m1

10.00 0.62
13.00 1.04
16.00 1.58
19.00 2.23
22.00 2.98
25.00 3.85
29.00 5.19
32.00 6.31
36.00 7.99

M 1 M3

37.04 m1
137.78 kg ( A)
65.19 kg ( B )

202.96 kg/m3 ( A + B )

37.04 m1
131.85 kg ( A)
48.89 kg ( B )

180.74 kg/m3 ( A + B )

16.67 m1 8.333333
158.00 kg ( A)
44.44 kg ( B )

202.44 kg/m3 ( A + B )

69.44 m1
172.22 kg ( A)
66.67 kg ( B ) 66.66

238.89 kg/m3 ( A + B )

42.74 m1
158.97 kg ( A)
58.88 kg ( B )

217.85 kg/m3 ( A + B )

22.22 m1
118.67 kg ( A)
31.00 kg ( B )

149.67 kg/m3 ( A + B )

30.86 m1
114.81 kg ( A)
59.26 kg ( B )

174.07 kg/m3 ( A + B )

30.86 m1
109.88 kg ( A)
59.26 kg ( B )

169.14 kg/m3 ( A + B )
25.00 m1
133.50 kg ( A)
40.00 kg ( B )

173.50 kg/m3 ( A + B )

8 jarak 15 cm
25.00 m1
158.00 kg ( A)
44.50 kg ( A)
40.00 kg ( B )

242.50 kg/m3 ( A + B )

25.00 m1
158.00 kg ( A)
53.33 kg ( B )

211.33 kg/m3 ( A + B )

44.44 m1
110.22 kg ( A)
71.11 kg ( B )

181.33 kg/m3 ( A + B )

44.44 m1
158.22 kg ( A)
71.11 kg ( B )

229.33 kg/m3 ( A + B )
20.00 m1
106.80 kg ( A)
48.00 kg ( B )

154.80 kg/m3 ( A + B )

25.00 m1
89.00 kg ( A)
53.33 kg ( B )

142.33 kg/m3 ( A + B )

26.67 m1
118.67 kg ( A)
56.89 kg ( B )

175.56 kg/m3 ( A + B )

11.11 m1
140.44 kg ( A)
35.56 kg ( B )

176.00 kg/m3 ( A + B )

11.11 m1
140.44 kg ( A)
35.56 kg ( B )

176.00 kg/m3 ( A + B )
33.33 m1
118.67 kg ( A)
36.17 kg ( B )

154.83 kg/m3 ( A + B )

33.33 m1
178.00 kg ( A)
48.22 kg ( B )

226.22 kg/m3 ( A + B )

82.64 m1
204.96 kg ( A)
56.36 kg ( B )

261.32 kg/m3 ( A + B )

16.67 m1
131.67 kg ( A)
44.44 kg ( B )

176.11 kg/m3 ( A + B )

14.29 m1
135.43 kg ( A)
41.90 kg ( B )

177.33 kg/m3 ( A + B )

7.27 m1
129.75 kg ( A)
12.95 kg ( B)
31.03 kg ( C ) 65.807

173.72 kg/m3 ( A + B )

5.56 m1 5.56 111.50


111.50 kg ( A) 26.688
9.89 kg ( B)
26.67 kg ( B ) 138.19

148.06 kg/m3 ( A + B )

5.56 m1 5.56 111.50


87.78 kg ( A) 26.688
9.89 kg ( B)
26.67 kg ( B ) 138.19

129.89 kg/m3 ( A + B )

60.61 m1
150.30 kg ( A)
84.04 kg ( B )

234.34 kg/m3 ( A + B )

44.44 m1
110.22 kg ( A)
71.11 kg ( B )

181.33 kg/m3 ( A + B )

26.67 m1
142.40 kg ( A)
56.89 kg ( B )
199.29 kg/m3 ( A + B )

22.22 m1
118.67 kg ( A)
53.33 kg ( B )

172.00 kg/m3 ( A + B )

16.12
8.333 m1 8.333333
55.556 btg
55.556 btg ( A)
6.667 btg
55.556 btg ( B)

137.78 kg/m3

137.78 kg/m3 ( A + B )

10.000 m1
66.667 btg
66.667 btg ( A)
6.667 btg 10
66.667 btg ( B) 133.333 165.3333

165.33 kg/m3

165.33 kg/m3 ( A + B )

12.500 m1
62.500 btg
62.500 btg ( A)
5.000 btg
62.500 btg ( B)

77.50 kg/m3

77.50 kg/m3 ( A + B )

8.333 m1
55.556 btg
55.556 btg ( A)
6.667 btg
55.556 btg ( B)

117.78 kg/m3

117.78 kg/m3 ( A + B )
RENCANA ANGGARAN BIAYA ( RAB )
Pekerjaan : Pembangunan Kolam Larutan Hara
Lokasi : Kampus IPB
: Kecamatan Dramaga - Kabupaten Bogor
Tahun Anggaran : 2016

HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT
SATUAN (Rp.) HARGA (Rp.)

I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 ls 350,000.00 350,000.00
2 Biaya Administrasi dan Dokumentasi Proyek 1.00 ls 1,500,000.00 1,500,000.00
3 Biaya mobilisasi barang 1.00 ls 1,122,000.00 1,122,000.00
4 Pek. Bouwplank 18.00 m' 66,392.94 1,195,072.96
5 Pembersihan setelah Pekerjaan selesai 1.00 ls 500,000.00 500,000.00
Sub Jumlah 4,667,072.96
II PEKERJAAN GALIAN TANAH
1 Pek. Galian tanah untuk pondasi 9.07 m³ 62,500.00 566,875.00
2 Pek. Urugan tanah bekas galian 5.60 m³ 20,833.33 116,666.67
3 Pek. Urugan pasir dibawah lantai 0.64 m³ 307,171.78 196,589.94
4 Pek. Lantai Kerja 10 Cm pondasi plat dan lantai 12.09 m³ 983,300.82 11,888,106.92
Sub Jumlah 12,768,238.53
III PEKERJAAN PASANGAN
1 Pas. Bata merah 1:5 23.40 m² 133,744.27 3,129,615.92
2 Pas. Plesteran 1 : 5 46.80 m² 61,289.98 2,868,371.29
3 Pas. Acian plesteran 46.80 m² 34,990.00 1,637,532.00
4 Pas. Acian beton Kolom 136.80 m² 34,990.00 4,786,632.00
5 Pas. Buangan Air PVC 3" 2.00 m' 103,179.06 206,358.12
6 Pas. Stop Kran 2.00 bh 250,000.00 500,000.00
Sub Jumlah 13,128,509.33
IV PEKERJAAN BETON
1 Pek. Pondasi Plat Beton Tulang ,Pedestal 1.63 m³ 3,691,612.85 6,017,328.94
2 Pek. Sloof Beton Tulang 15/18 (180 kg besi + bekisting) 6 btg dia 10 8 3.24 m³ 5,651,307.99 18,310,237.90
3 Pek. Kolom Beton Tulang Praktis 12/12 (237kg besi + bekisting) 0.39 m³ 6,825,102.91 2,661,790.13
4 Pek. Balok lintel 11/11 cm (244 kg besi + bekisting) 1.38 m³ 7,476,797.17 10,317,980.09
5 Pek. Pelat Lantai Beton Tulang 8 Cm 27.06 m³ 4,487,727.76 121,437,913.28
Sub Jumlah 158,745,250.35
VIII PEKERJAAN PENGECATAN/FINISHING
1 Pengecatan Water proping 265.30 m² 57,820.47 15,339,770.16
2 Pengecatan Dinding set ICI 3 X Laburan 67.80 m² 80,124.17 5,432,418.46
Sub Jumlah 20,772,188.62
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Pekerjaan : Pembangunan Kolam Larutan Hara
Lokasi : Kampus IPB
: Kecamatan Dramaga - Kabupaten Bogor
Tahun Anggaran : 2016

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN 4,667,072.96


II PEKERJAAN GALIAN TANAH 12,768,238.53
III PEKERJAAN PASANGAN 13,128,509.33
IV PEKERJAAN BETON 158,745,250.35
VIII PEKERJAAN PENGECATAN/FINISHING 20,772,188.62

JUMLAH 210,081,259.78
PPN 10% 21,008,125.98
JUMLAH TOTAL 231,089,385.76
DIBULATKAN 231,089,000.00

TERBILANG : SERTUS TIGA PULUH ENAM JUTA SEMBILAN RATUS DELAPAN PULUH DELAPAN RIBU RUPIAH

Bogor. …………….2016
Konsultan Perencana
CV. FADEL PUTRA

YEYEN SURYANA . ST.


Direktur
RENCANA ANGGARAN BIAYA ( RAB )
Pekerjaan : Pembangunan Kolam Larutan Hara
Lokasi : Agribusiness Development Station IPB
: Kampus IPB Darmaga-Bogor
Tahun Anggaran : 2016

HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT
SATUAN (Rp.) HARGA (Rp.)

I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 ls 350,000.00 350,000.00
2 Biaya Administrasi dan Dokumentasi Proyek 1.00 ls 1,122,000.00 1,122,000.00
3 Biaya mobilisasi barang 1.00 ls 1,500,000.00 1,500,000.00
4 Pek. Bouwplank 18.00 m' 66,392.94 1,195,072.96
5 Pembersihan setelah Pekerjaan selesai 1.00 ls 500,000.00 500,000.00
Sub Jumlah 4,667,072.96
II PEKERJAAN GALIAN TANAH
1 Pek. Galian tanah untuk pondasi 9.07 m³ 62,500.00 566,875.00
2 Pek. Urugan tanah bekas galian 5.60 m³ 20,833.33 116,666.67
3 Pek. Urugan pasir dibawah lantai 0.64 m³ 307,171.78 196,589.94
4 Pek. Lantai Kerja 5 Cm pondasi plat dan lantai 12.09 m³ 983,300.82 11,888,106.92
Sub Jumlah 12,768,238.53
III PEKERJAAN PASANGAN
1 Pas. Bata merah 1:5 78.58 m² 133,744.27 10,509,624.73
2 Pas. Plesteran 1 : 5 157.16 m² 61,289.98 9,632,334.01
3 Pas. Acian plesteran 157.16 m² 34,990.00 5,499,028.40
4 Pas. Acian beton lantai 216.00 m² 34,990.00 7,557,840.00
Sub Jumlah 33,198,827.14
IV PEKERJAAN BETON
1 Pek. Pondasi Plat Beton Tulang ,Pedestal 1.63 m³ 3,691,612.85 6,017,328.94
2 Pek. Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4 btg dia 12 3.60 m³ 5,651,307.99 20,344,708.78
3 Pek. Kolom Beton Tulang Praktis 12/12 (237kg besi + bekisting) 0.42 m³ 6,825,102.91 2,866,543.22
4 Pek. Balok lintel 11/11 cm (244 kg besi + bekisting) 1.85 m³ 7,476,797.17 13,832,074.76
5 Pek. Pelat Lantai Beton Tulang 10 Cm 21.60 m³ 2,412,306.52 52,105,820.86
Sub Jumlah 95,166,476.57
V PEKERJAAN PENGECATAN/FINISHING
1 Pengecatan Water proping 265.30 m² 57,820.47 15,339,770.16
2 Pengecatan Dinding set ICI 3 X Laburan 67.80 m² 80,124.17 5,432,418.46
Sub Jumlah 20,772,188.62
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Pekerjaan : Pembangunan Kolam Larutan Hara
Lokasi : Agribusiness Development Station IPB
: Kampus IPB Darmaga-Bogor
Tahun Anggaran : 2016

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN 4,667,072.96


II PEKERJAAN GALIAN TANAH 12,768,238.53
III PEKERJAAN PASANGAN 33,198,827.14
IV PEKERJAAN BETON 95,166,476.57
V PEKERJAAN PENGECATAN/FINISHING 20,772,188.62

JUMLAH 166,572,803.81
PPN 10% 16,657,280.38
JUMLAH TOTAL 183,230,084.19
DIBULATKAN 183,230,000.00

TERBILANG : SERTUS DELAPAN PULUH ENAM JUTA EMPAT RATUS SEMBILAN PULUH LIMA RIBU RUPIAH

Bogor. …………….2016
Konsultan Perencana
CV. FADEL PUTRA

YEYEN SURYANA . ST.


Direktur
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBUATAN DPT DAN PELEBARAN JALAN RT 03/03 CIJUJUNG
LOKASI : DESA CIJUJUNG KEC. SUKARAJA KAB. BOGOR
TAHUN : 2018

HARGA
NO. URAIAN PEKERJAAN VOL. SAT. SAT. JUMLAH (RP)
( Rp )
I PEKERJAAN PERSIAPAN DAN BONGKARAN
1 Administrasi dan dokumentasi 1.00 ls 300,000.00 300,000.00
2 Pek. Bongkaran dan bobokan tembok bangunan existing 4.00 rmh 1,000,000.00 4,000,000.00
3 Pek. Bouwplank 130.00 m² 78,380.00 10,189,400.00
SUB TOTAL I 14,489,400.00
II PEKERJAAN TANAH DAN PASANGAN (DPT)
1 Pek. Galian tanah Biasa 104.00 m³ 91,130.00 9,477,520.00
2 Pek. Pasangan batu belah ad, 1 : 5 452.65 m³ 1,212,670.00 548,915,075.50
3 Pek. Sulingan + ijuk 367.00 m² 43,760.00 16,059,920.00
4 Pek. Siar Luar ad. 1 : 2 91.75 m² 76,660.00 7,033,555.00
SUB TOTAL II 581,486,070.50
III PEKERJAAN JALAN
1 Perekat Beton (Sikacim Bonding Adhesive) 162.50 ltr 6,875.00 1,117,187.50
2 Pek. Bekisting 130.00 m' 97,500.00 12,675,000.00
3 Pek. Overlay jalan Beton K-250, tb. 20 cm 67.60 m³ 1,396,050.00 94,372,980.00
Pek. Pembuatan dan pemasangan Railing pengaman, pipa besi GIP
4 medium 2" dan 1 1/2 " t. 1 m, finishing cat 75.00 m' 245,690.00 18,426,750.00

SUB TOTAL III 126,591,917.50


IV PEKERJAAN PERAPIHAN
1 Pek. Perapihan kembali bangunan terdampak 4.00 rmh 10,000,000.00 40,000,000.00
2 Pek. Buangan tanah dan puing ex. Bongkaran 1.00 ls 2,000,000.00 3,000,000.00
SUB TOTAL IV 43,000,000.00
REKAPITULASI
KEGIATAN : PEMBUATAN DPT DAN PELEBARAN JALAN RT 03/03 CIJUJUNG
LOKASI : DESA CIJUJUNG KEC. SUKARAJA KAB. BOGOR
TAHUN : 2018

NO. URAIAN PEKERJAAN JUMLAH (RP)

I PEKERJAAN PERSIAPAN 14,489,400.00

II PEKERJAAN TANAH DAN PASANGAN (DPT) 581,486,070.50

III PEKERJAAN JALAN 126,591,917.50

IV PEKERJAAN PERAPIHAN 43,000,000.00

JUMLAH 765,567,388.00

DIBULATKAN 765,567,000.00

TERBILANG : Err:511

Bogor, Otober 2016


Ketua RT 03/03 Desa Cijujung
TYPE 1
GALIAN TANAH
P L T
40 1 0.8 32
PASANGAN BATU
PONDASI
40 1 0.8 32
BADAN
40 0.95 2.3 87.4

TYPE 2
GALIAN
P L T
25 1 0.8 20
PASANGAN BATU
PONDASI
25 1 0.8 20
BADAN
25 0.95 3 71.25

TYPE 3
GALIAN
P L T
35 1 0.8 28
PASANGAN BATU
PONDASI
35 1 0.8 28
BADAN
35 0.95 4 133

TYPE 4
GALIAN
P L T
30 1 0.8 24
PASANGAN BATU
PONDASI
30 1 0.8 24
BADAN
30 0.95 2 57

GALIAN TANAH 104 M3


Pasangan batu 452.65 m3
0.9
sulingan
92
75
140
60
367

s
HARGA SATUAN UPAH

NO Sat. Upah

1 Pekerja Oh 105,000.00
2 Tukang Batu Oh 127,000.00
3 Tukang Kayu Oh 127,000.00
4 Tukang Besi/Baja Oh 127,000.00
5 Tukang Cat Oh 127,000.00
6 Tukang Listrik Oh 127,000.00
7 Kepala Tukang Oh 140,000.00
8 Kepala Tukang Batu Oh 140,000.00
9 Kepala Tukang Kayu Oh 140,000.00
10 Kepala Tukang Besi Oh 140,000.00
11 Kepala Tukang Cat Oh 140,000.00
12 Kepala Tukang Listrik Oh 140,000.00
13 Mandor Oh 160,000.00
HARGA SATUAN BAHAN

Harga Satuan
NO Sat.
(Rp.)
1 Kayu 5/7 m3 2,437,000.00
2 Paku Biasa 2"-5" Kg 23,900.00
3 Kayu Papan 3/20 m3 2,303,000.00
4 Batu belah 15/20 cm m3 340,000.00
5 Semen Portland Kg 1,600.00
6 Pasir Pasang m3 370,000.00
7 Pipa PVC 2" AW btg 86,000.00
8 Ijuk kg 23,200.00
9 Kayu 6/12 terentang (2x pakai) m3 2,608,000.00
10 Kayu 3/20 terentang (2 x pakai) m3 2,608,000.00
11 Paku kg 19,900.00
12 Beton ReadyMix K - 250 tanpa pompa m³ 985,000.00
13 Pipa GIP Medium A d. 2" Btg 549,000.00
14 Pipa GIP Medium A d. 1 1/2" Btg 297,000.00
15 Cat meni besi m2 25,200.00
16 Cat besi Kg 39,100.00
ANALISA HARGA SATUAN PEKERJAAN

Harga Sat. Jumlah Harga Jumlah Harga


Bahan, Alat/
NO URAIAN PEKERJAAN Koeff. Sat. Upah Bahan Upah (Rp.) Bahan + Upah
(Rp.) (Rp.) ( Rp.)
1 1 M2 Pengukuran dan Pasang Bouwplank
Kayu 5/7 0.0120 m3 2,437,000.00 29,244.00
Bahan Paku Biasa 2"-5" 0.0200 Kg 23,900.00 478.00
Kayu Papan 3/20 0.0070 m3 2,303,000.00 16,121.00
Pekerja 0.1000 Oh 105,000.00 10,500.00
Tenaga Tukang Kayu 0.1000 Oh 127,000.00 12,700.00
Kerja Kepala Tukang 0.0100 Oh 140,000.00 1,400.00
Mandor 0.0050 Oh 164,000.00 820.00
Jumlah 45,843.00 25,420.00 71,263.00
Overhead 7,126.30
Jumlah 78,389.30
Dibulatkan 78,380.00
2 Menggali 1 m3 tanah biasa sedalam 1 meter
Tenaga Pekerja 0.7500 Oh 105,000.00 78,750.00
Kerja Mandor 0.0250 Oh 164,000.00 4,100.00
Jumlah 82,850.00 82,850.00
Overhead 8,285.00
Jumlah 91,135.00
Dibulatkan 91,130.00
3 Memasang 1 m3 Pondasi Batu belah campuran 1 PC : 5 PS
Batu belah 15/20 cm 1.2000 m3 340,000.00 408,000.00
Bahan Semen Portland 136.0000 Kg 1,600.00 217,600.00
Pasir Pasang 0.5440 m3 370,000.00 201,280.00
Pekerja 1.5000 Oh 105,000.00 157,500.00
Tenaga Tukang Batu 0.7500 Oh 127,000.00 95,250.00
Kerja Kepala Tukang 0.0750 Oh 140,000.00 10,500.00
Mandor 0.0750 Oh 164,000.00 12,300.00
Jumlah 826,880.00 275,550.00 1,102,430.00
Overhead 110,243.00
Jumlah 1,212,673.00
Dibulatkan 1,212,670.00
4 1 M2 Pasang sulingan + injuk
Pipa PVC 2" AW 0.1000 btg 86,000.00 8,600.00
Bahan
Ijuk 1.1000 kg 23,200.00 25,520.00

Tenaga
Kerja Pekerja 0.0540 Oh 105,000.00 5,670.00

Jumlah 34,120.00 5,670.00 39,790.00


Overhead 3,979.00
Jumlah 43,769.00
Dibulatkan 43,760.00
5 Membuat 1 m2 Finishing siar pasangan dinding batu kali adukan 1 PC : 2 PP
Semen portland 6.3400 kg 1,600.00 10,144.00
Bahan
Pasir pasang 0.0120 m3 370,000.00 4,440.00
Pekerja 0.3000 Oh 105,000.00 31,500.00
Tenaga Tukang Batu 0.1500 Oh 127,000.00 19,050.00
Kerja Kepala Tukang 0.0150 Oh 140,000.00 2,100.00
Mandor 0.0150 Oh 164,000.00 2,460.00
Jumlah 14,584.00 55,110.00 69,694.00
Overhead 6,969.40
Jumlah 76,663.40
Dibulatkan 76,660.00
Harga Sat. Jumlah Harga Jumlah Harga
Bahan, Alat/
NO URAIAN PEKERJAAN Koeff. Sat. Upah Bahan Upah (Rp.) Bahan + Upah
(Rp.) (Rp.) ( Rp.)
6 1 M2 Bekisting
Kayu 6/12 terentang (2x pakai) 0.0060 m3 2,608,000.00 15,648.00
Bahan Kayu 3/20 terentang (2 x pakai) 0.0170 m3 2,608,000.00 44,336.00
Paku 0.4000 kg 19,900.00 7,960.00
Pekerja 0.1200 Oh 105,000.00 12,600.00
Tenaga
Kerja Mandor 0.0250 Oh 164,000.00 4,100.00
Tk. Kayu 1/2 terampil (bongkar ceta 0.0500 Oh 80,000.00 4,000.00
Jumlah 67,944.00 20,700.00 88,644.00
Overhead 8,864.40
Jumlah 97,508.40
Dibulatkan 97,500.00
7 1 M2 Hamparan Beton Ready Mix K-250 Tanpa Pompa
Bahan Beton ReadyMix K-250 1.0500 m³ 985,000.00 1,034,250.00
Pekerja 2.0000 Oh 105,000.00 210,000.00
Tenaga Tukang batu 0.1500 Oh 127,000.00 19,050.00
Kerja Kep. tukang batu 0.0300 Oh 140,000.00 4,200.00
Mandor 0.0100 Oh 164,000.00 1,640.00
Jumlah 1,034,250.00 234,890.00 1,269,140.00
Overhead 126,914.00
Jumlah 1,396,054.00
Dibulatkan 1,396,050.00
8 1 M' Tiang Pipa Besi Medium Hitam,
Pipa GIP Medium A d. 2" 0.1100 Btg 549,000.00 60,390.00
Pipa GIP Medium A d. 1 1/2" 0.3670 Btg 297,000.00 108,999.00
Bahan
Cat permukaan baja dengan meni be 0.3630 m2 25,200.00 9,147.60
Cat besi 0.3000 Kg 39,100.00 11,730.00
Pekerja 0.2500 Oh 105,000.00 26,250.00
Tenaga Tukang besi profil terampil 0.0250 Oh 127,000.00 3,175.00
Kerja Kepala tukang besi profil 0.0250 Oh 140,000.00 3,500.00
Mandor 0.0010 Oh 164,000.00 164.00
Jumlah 190,266.60 33,089.00 223,355.60
Overhead 22,335.56
Jumlah 245,691.16
Dibulatkan 245,690.00
REKAPITULASI ANALISA SATUAN PEKERJAAN

KOEF
NO URAIAN KODE Analisa
Harga Satuan

A. PEKERJAAN PERSIAPAN
1 1 M' Pagar Sementara dari Kayu Tinggi 2 m A-01 509,172.30
2 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m A-02 620,651.49
3 1 M' Pagar Sementara Kawat Duri Tinggi 1,80 m A-03 1,501,795.45
4 1 M2 Pengukuran dan Pasang Bouwplank A-04 66,392.94
5 1 M2 Pembuatan Kantor Sementara dengan Lantai diPlester A-05 1,400,181.68
6 1 M2 Pembuatan Gudang Semen dan Alat-alat A-06 1,077,226.98
7 1 M2 Pembuatan Bedeng Buruh A-07 1,371,098.35
8 1 M2 Membersihkan Lapangan & Perataan A-08 8,600.00
9 1 M3 Pembuatan Jalan Sementara A-09 477,710.73
10 1 M3 Bongkaran Beton Bertulang A-10 573,306.00
11 1 M3 Bongkaran Dinding Tembok Bata Merah A-11 573,306.00
12 1 m2 Pembuatan bak adukan ukuran 40 x 50 x 25 cm A-12 175,935.29
13 1 M' Pagar Kawat Ayam Tiang Besi L50.50.5, tinggi 1 m' A-13 391,029.85
14 1 M2 Pagar BRC lengkap dengan tiang A-14 262,899.98
15 1 M2 Steiger Werk/Perancah dari Bambu A-15 34,121.64
16 1 M' Cerucuk Bambu A -16 68,300.00
17 Pasang 1 m' Pagar Kawat Jaring Galvanis, Tinggi 1 meter A-17 55,785.62
18 Pasang 1 m' Pagar Beton Pracetak (5 x 50 x 213) cm A-18 614,932.45
19 Memasang 1 M' Pagar Besi A-19 2,739,403.14
20 Memasang 1 Unit Pintu Besi A-20 13,852,141.12
B. PEKERJAAN TANAH
1 Menggali 1 m3 tanah biasa sedalam 1 meter B-01 62,500.00
2 Menggali 1 m3 tanah biasa sedalam 2 meter B-02 77,400.00
3 Menggali 1 m3 tanah biasa sedalam 3 meter B-03 92,620.00
4 Menggali 1 m3 tanah keras sedalam 1 meter B-04 83,120.00
5 Menggali 1 m3 tanah cadas sedalam 1 meter B-05 126,600.00
6 Menggali 1 m3 tanah lumpur sedalam 1 meter B-06 100,800.00
7 Mengerjakan 1 m2 stripping tebing setinggi 1 meter B-07 4,700.00
8 Membuang 1 m3 tanah sejauh 15 meter B-08 27,340.00
9 Mengurug kembali 1 m3 galian B-09 20,833.33
10 Memadatkan 1 m3 tanah (per 20 cm) B-10 47,000.00
11 Mengurug 1 m3 pasir urug B-11 307,171.78
12 Memasang 1 m3 Lapisan pudel campuran 1 KP : 3 PP : 7 TL untuk stabilisasi tanah B-12 199,257.28
13 Memasang 1 m3 Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi tanah B-13 246,352.19
14 Memasang 1 m2 Lapisan Ijuk tebal 10 cm, untuk bidang resapan B-14 153,789.00
15 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan B-15 340,128.40
16 1 m3 Pasangan Batu Beronjong B-16 765,202.29
C. PEKERJAAN PONDASI
1 Memasang 1 m3 Pondasi Batu belah campuran 1 PC : 3 PS C-01 1,083,382.42
2 Memasang 1 m3 Pondasi Batu belah campuran 1 PC : 4 PS C-02 1,024,286.56
3 Memasang 1 m3 Pondasi Batu belah campuran 1 PC : 5 PS C-03 983,300.82
4 Memasang 1 m3 Pondasi Batu belah campuran 1 PC : 6 PS C-04 954,494.26
5 Memasang 1 m3 Pondasi Batu belah campuran 1 PC : 8 PP C-05 914,991.26
6 Memasang 1 m3 Pondasi Batu belah, campuran 1 KP : 1 SM : 2 PP C-06 746,597.64
7 Memasang 1 m3 Pondasi Batu belah, campuran 1 PC : 3 KP : 10 PP C-07 846,399.65
8 Memasang 1 m3 Pondasi Batu belah, campuran 1/4 PC : 1 KP : 4 PP C-08 818,646.01
9 Memasang 1 m3 Batu Kosong (aanstamping) C-09 562,588.70
10 Memasang 1 m3 Beton Siklop, 60% beton campuran 1 Pc : 2Pb : 3kr + 40% Batu Belah C-10 2,349,165.61
11 Memasang 1 m3 Pondasi Sumuran, diameter 100 cm C-11 1,003,333.95
12 1 M' Pembuatan Tiang Pancang (40 x 40) cm, Beton Tulang C-12 791,169.96
13 1 M' Pembuatan Tiang Pancang (35 x 35) cm, Beton Tulang C-13 598,419.35
14 1 M' Pembuatan Tiang Pancang θ40 cm, Beton Tulang C-14 843,184.14
15 1 M' Memancang Tiang Pancang Beton Bertulang C-15 129,656.56
16 1 Buah Memotong Tiang Pancang (40x40) cm Beton Bertulang C-16 292,516.57
17 1 M' Menyambung Tiang Pancang Beton Bertulang C-17 791,999.67
D. PEKERJAAN BETON
1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12±2) cm, w/c = 8,7 D-01 1,017,082.89
2 Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12±2) cm, w/c = 0,78 D-02 1,061,138.64
3 Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12±2) cm, w/c = 0,72 D-03 1,096,049.33
4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6)cm w/c = 0,87 D-04 949,655.79
5 Membuat 1 m3 lantai kerja beton mutu f'c = 14,5 Mpa (K175), slump (12±2)cm w/c = 0,66 D-05 1,136,863.23
6 Membuat 1 m3 lantai kerja beton mutu f'c = 16,9 Mpa (K200), slump (12±2)cm w/c = 0,61 D-06 1,176,611.00
7 Membuat 1 m3 lantai kerja beton mutu f'c = 19,3 Mpa (K225), slump (12±2)cm w/c = 0,58 D-07 1,205,258.59
8 Membuat 1 m3 lantai kerja beton mutu f'c = 21,7 Mpa (K250), slump (12±2)cm w/c = 0,56 D-08 1,225,721.77
9 Membuat 1 m3 lantai kerja beton mutu f'c = 24 Mpa (K275), slump (12±2)cm w/c = 0,53 D-09 1,261,007.74
10 Membuat 1 m3 lantai kerja beton mutu f'c = 26,4 Mpa (K300), slump (12±2)cm w/c = 0,52 D-10 1,271,945.74
11 Membuat 1 m3 lantai kerja beton mutu f'c = 28,8 Mpa (K325), slump (12±2)cm w/c = 0,49 D-11 1,360,845.66
12 Membuat 1 m3 lantai kerja beton mutu f'c = 31,2 Mpa (K350), slump (12±2)cm w/c = 0,48 D-12 1,375,207.89
13 Membuat 1 m3 beton kedap air dengan storox - 100 D-13 1,360,430.32
14 Memasang 1m' PVC waterstop lebar 150 mm D-14 98,414.65
15 Memasang 1 m' PVC Waterstop lebar 200 mm D-15 99,040.45
16 Memasang 1 m' PVC Waterstop lebar 230 mm - 320 mm D-16 151,934.61
17 Pembesian 10 kg dengan besi polos atau besi ulir D-17 118,209.47
18 Pembesian 1 kg dengan besi polos atau besi ulir HIT-1 11,820.95
19 Memasang 10 kg kabel presstressed polos/strands D-18 112,940.76
20 Memasang 1 kg jaring kawat baja/wire mesh D-19 131,119.73
21 Memasang 1 m2 bekisting untuk pondasi D-20 152,156.42
22 Memasang 1 m2 bekisting untuk Sloof D-21 160,382.58
23 Memasang 1 m2 bekisting untuk Kolom D-22 343,564.00
24 Memasang 1 m2 bekisting untuk balok D-23 351,790.16
25 Memasang 1 m2 bekisting untuk plat lantai D-24 440,084.25
26 Memasang 1 m2 bekisting untuk dinding D-25 426,856.59
27 Memasang 1m2 bekisting untuk tangga D-26 324,605.81
28 Memasang 1 m2 jembatan untuk pengecoran beton D-27 85,591.96
29 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) D-28 3,691,612.85
30 Membuat 1 M3 Tangga Beton Tulang (200 kg Besi + Bekisting) D-29 4,447,859.59
31 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) D-30 7,662,818.54
32 Membuat 1 m3 Sloof beton bertulang 15 x 18 cm, 6dia10-Dia 8-15 Cm(201 kg besi + bek) HIT-2 5,651,307.99
Membuat 1 m3 Sloof beton bertulang 15 x 20 cm, 6dia10-Dia 8-15 Cm(201 kg besi + bek) 5,403,014.65
Membuat 1 m3 Sloof beton bertulang 11x 11 CM, 4 dia.10-Dia 8-20 (260 kg besi + bek) 5,668,332.92

33 Membuat 1 m3 Sloof beton bertulang 20 x 30 CM, 6dia.16-Dia 8-15 (200 kg besi + bek) HIT-3 5,116,699.39
34 Membuat 1 m3 kolom beton bertulang 18 x 18 Cm, 6 Dia 10 + Dia 8 - 15 Cm (172 kg besi + bek) HIT-4 6,987,443.90
35 Membuat 1 m3 kolom beton bertulang 13 x 18cm, 6 Dia 10 - Dia 8 - 15 Cm (200 kg besi + bek) HIT-5 8,052,541.53
Membuat 1 m3 kolom beton bertulang 11 x 11 cm, 4 Dia 10 - Dia 8 - 20 Cm (260 kg besi + bek) 7,333,618.55
36 Membuat 1 m3 kolom beton bertulang 15 x 20 cm, 4 Dia 12 - Dia 8 - 15 Cm(180 kg besi + bek) HIT-6 6,413,970.37
37 Membuat 1 m3 kolom beton bertulang 20 x 20 cm, 4 dia.16 8-15 (210 kg besi + bek) HIT-7 7,054,902.11
38 Membuat 1 m3 kolom beton bertulang 20 x 20cm, 4 dia.12 8-15 (140 kg besi + bek) HIT-8 6,227,435.82
39 Membuat 1 m3 balok beton bertulang 11 x 11 cm, 4 dia.10, 8-15, (260 kg besi + bek) 7,476,797.17
40 Membuat 1 m3 kolom beton bertulang 30 x 30cm, 8dia.16, 8-15(175 kg besi + bek) HIT-9 5,495,955.63
41 Membuat 1 m3 Balok beton bertulang 20 x 30, 5 dia.16, 8-15(175 kg besi + bek) HIT-11 6,557,287.41
42 Membuat 1 m3 Balok beton bertulang 30 x 60 cm, 10 dia.16, 8-15 (125 kg besi + bek) HIT-12 5,614,461.62
43 Membuat 1 m3 Plat lantai beton tbl. 12 cm' besi dia. 8 mm (110 kg besi + bekisting) HIT-13 6,172,916.84
44 Membuat 1 m3 Listplank beton tbl. 8 cm', besi dia. 8 mm (50 kg besi + bekisting) HIT-14 2,746,887.92
45 Membuat 1 m3 kolom beton bertulang 12 x 12 cm, 4 Dia 10 - Dia 8 - 15 Cm (239 kg besi + bek) 6,825,102.91
46 Membuat 1 m3 Balok beton bertulang 13 x 18 cm, 6 dia.10, 8-15 (180 kg besi + bekisting) HIT-15.alt 5,970,711.83
47 Membuat 1 m3 Balok beton bertulang 15 x 20 cm, 4 dia.12, 8-15 (180 kg besi + bekisting) HIT-15 5,609,895.55
48 Membuat 1 m3 Balok beton bertulang 15 x 25,cm, 5 dia.12 +dia 8-15 (176 kg besi + bekisting) HIT-16 6,266,197.94
Membuat 1 m3 Plat beton bertulang tb 12,cm, (90 kg besi + bekisting) 5,936,497.89
Membuat 1 m3 Plat beton bertulang tb 12,cm, (110 kg besi + bekisting) 6,172,916.84
Membuat 1 m3 Plat beton bertulang tb 8,cm, (45 kg besi + bekisting) lisplang 4,487,727.76
Membuat 1 m3 Plat beton bertulang tb 10,cm, Lantai (45 kg besi + bekisting) lisplang 2,412,306.52
49 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) D- 31 6,041,560.89
50 Membuat 1 m3 Plat beton bertulang (150 kg besi + bekisting) D- 32 5,680,331.48
51 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) D- 33 5,464,982.56
52 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) D- 34 5,623,260.20
53 Membuat 1 m' Kolom praktis beton bertulang (11 x 11) cm D- 35 67,284.61
54 Membuat 1 m' ring balok beton bertulang (10 x 15) cm D- 36 94,907.97
55 Pekerjaan Water Proofing D-37 510,980.00
56 Pekerjaan Water Proofing Membran D-38 135,641.20
E. PEKERJAAN PASANGAN DINDING
1 Memasang 1 M2 Bata Merah tebal 1 Bata, 1pc : 3ps E-01 293,047.80
2 Memasang 1 M2 Bata Merah tebal 1 Bata, 1pc : 4ps E-02 282,162.32
3 Memasang 1 M2 Bata Merah tebal 1 Bata. 1pc : 5ps E-03 277,187.67
4 Memasang 1 M2 Bata Merah tebal 1/2 bata, 1pc :3ps E-04 140,599.97
5 Memasang 1 M2 Bata Merah tebal 1/2 Bata, 1pc : 4ps E-05 141,560.75
6 Memasang 1 M2 Bata Merah tebal 1/2 Bata, 1pc : 5ps E-06 133,744.27
Memasang 1 M2 Bata Hebel 139,783.24
7 Memasang 1 M2 Dinding Rooster Beton 20 x 20, adk 1pc : 3ps E-07 366,069.17
8 Memasang 1 M2 Dinding Rooster Beton 20 x 20, adk 1pc : 4pc E-08 362,829.17
9 Memasang 1 M2 Dinding Rooster/Terawang (12 x 11 x 24) cm E-09 1,538,823.01
10 Memasang 1 M2 Dinding Batako Besar Pres uk. 8x20x30 adk 1pc :4ps E-10 116,794.84
11 Memasang 1 M2 Dinding Hollowblock (HB-20) E-11 212,552.35
12 Memasang 1 M2 Dinding Hollowblock (HB-15) E-12 202,034.22
13 Memasang 1 M2 Dinding Conblock (CB-20) E-13 193,127.67
14 Memasang 1 M2 Dinding Conblock (CB-20) E-14 224,489.12
15 Memasang 1 M2 Dinding Conblock (CB-15) E-15 109,177.34
16 Memasang 1 M2 Dinding untuk Conblock (CB-10) E-16 109,177.34
17 Memasang 1 M2 Dinding Keramik artistik (10 x 20) cm E-17 194,721.46
18 Memasang 1 M2 Dinding Keramik artistik (5 x 20) cm E-18 196,965.50
19 Memasang 1 M2 Dinding Keramik Corak 20 x 20 cm E-19 264,627.10
19 Memasang 1 M2 Dinding Keramik Corak 20 x 25 cm E - 20 290,259.22
19 Memasang 1 M2 Dinding Keramik Marmer E - 21. 933,238.25
19 Memasang 1 M2 Dinding Batu Tempel Hitam E - 22. 454,625.71
22 1 M' Saluran Air hujan lebar = 20 cm E - 23. 97,493.27
23 Memasang 1 M2 Dinding Porselen (10x20) cm E - 24. 191,418.16
24 Memasang 1 M2 Dinding Porselen (20x20) cm E-25 179,300.33
25 Memasang 1 M2 Wall paper, lebar 50 cm E - 26 144,791.99
26 Membuat 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka kayu Klas II E - 27 280,969.21
27 Membuat 1 M2 Dinding Pemisah Plywood Rangkap, Rangka kayu klas II E - 28 351,678.83
28 Membuat 1 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka kayu klas II E - 29 265,389.01
29 Membuat 1 M2 Dinding Pemisah GRC t = 4 mm + Rangka Besi hollow E - 30 100,866.53
30 Membuat 1 M2 Dinding Pemisah Plywood t = 4 mm + Rangka Besi hollow E - 31 122,330.39
31 Membuat 1 M2 Dinding Pemisah Teakwood t = 4 mm + Rangka Besi hollow E - 32 101,768.79
32 Memasang 1 M2 Dinding Glass Block 20 x 20 adk. 1pc : 4ps E- 33 870,309.03
33 Memasang 1 M2 Dinding Anyaman bambu, rangka kayu E - 34 123,725.47
34 Memasang 1 M2 dinding Block Bata Ringan E - 35 601,950.30
F. PEKERJAAN PLESTERAN DAN SIARAN
1 Membuat 1 m2 plesteran 1 PC : 1 PP, tebal 15 cm F-01 76,693.38
2 Membuat 1 m2 Plesteran 1 PC : 2 PS, tebal 15 mm F-02 68,458.42
3 Membuat 1 m2 Plesteran 1 PC : 3 PS, tebal 15 mm F-03 65,003.80
4 Membuat 1 m2 Plesteran 1 PC : 4 PS, tebal 15 mm F-04 62,556.26
5 Membuat 1 m2 Plesteran 1 PC : 5 PP, tebal 15 mm F-05 61,289.98
6 Membuat 1 m2 Plesteran 1PC : 6 PP, tebal 15 mm F-06 60,224.85
7 Membuat 1 m2 Plesteran 1 PC : 7 PP, tebal 15 mm F-07 59,678.11
8 Membuat 1 m2 Plesteran 1 PC : 8 PP, tebal 15 mm F-08 59,131.37
9 Membuat 1 m2 Plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm F-09 97,170.73
10 Membuat 1 m2 Plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm F-10 57,484.56
11 Membuat 1 m2 Plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm F-11 51,917.18
12 Membuat 1 m2 Plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm F-12 52,982.12
13 Membuat 1 m2 Plesteran 1 PC : 2 PP, tebal 20 mm F-13 91,703.65
14 Membuat 1 m2 Plesteran 1 PC : 3 PP, tebal 20 mm F-14 74,737.49
15 Membuat 1 m2 Plesteran 1 PC : 4 PP, tebal 20 mm F-15 83,728.35
16 Membuat 1 m2 Plesteran 1 PC : 5 PP, tebal 20 mm F-16 82,145.73
17 Membuat 1 m2 Plesteran 1 PC : 6 PP, tebal 20 mm F-17 80,619.79
18 Membuat 1 m2 Plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm F-18 73,592.53
19 Membuat 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm F-19 39,576.98
20 Membuat 1 m' Plesteran Skoning lebar 10 mm 1 PC : 2 PP F-20 147,871.03
21 Membuat 1 m2 Plesteran Granit, 1 PC : 2 Granit, tebal 10 mm F-21 147,871.03
22 Membuat 1 m2 Plesteran Teraso, 1 PC : 2 batu teraso, tebal 10 mm F-22 123,192.56
23 Membuat 1 m2 Plesteran ciprat/kamprotan, 1 PC : 2 PP F-23 47,419.57
24 Membuat 1 m2 Finishing siar pasangan dinding bata merah (=20 m') F-24 27,591.40
25 Membuat 1 m2 Finishing siar pasangan dinding conblock ekspose (= 8 m') F-25 13,221.00
26 Membuat 1 m2 Finishing siar pasangan dinding batu kali adukan 1 PC : 2 PP F-26 58,929.13
27 Membuat 1 m2 Acian F-27 34,990.00
28 Membuat 1 m2 Acian Semen Instan F-28 43,928.32
G. PEKERJAAN ATAP
1 1 M2 Pasang Atap Genteng Palentong G - 01. 64,498.94
2 1 M2 Pasang Genteng Bubung Palentong G - 02. 115,774.86
3 1 M2 Pasang Atap Genteng Murando Natural G - 03. 189,020.83
4 1 M2 Pasang Nok Genteng Murando natural G - 04. 86,991.38
5 1 M2 Pasang Atap Genteng Murando Glazur. G - 05. 203,067.80
6 1 M2 Pasang Nok Genteng Murando Glazur G - 06. 107,520.63
7 1 M' Pasang Nok Genteng tepi morando G - 07. 90,716.01
8 1 M2 Pasang Atap Genteng Metal G - 08. 122,259.24
9 1 M' Pasang Nok Genteng Metal G - 09. 115,702.39
H. PEKERJAAN PLAFOND
1 1 M2 Plafond Asbes (1,00 x 1,00) m, tebal 4 mm H-01 45,182.95
2 1 M2 Plafond Asbes (1,00 x 1,00) m, tebal 3,5 mm H-02 38,373.44
3 1 M2 Plafond Triplek 4 mm + Rangka Kayu Kelas II H-03 171,801.26
4 1 M2 Plafond Gypsum Board, tebal 9 mm + Rangka Besi Hollow H-04 109,415.55
5 1 M2 Langit-langit GRC t = 4 mm + Rangka Besi Hollow H-05 103,389.14
6 1 M2 Langit-langit Gypsum t = 9 mm + Rangka Kayu Borneo Super H-06 174,778.04
7 1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu H-07 170,671.50
8 1 M' List Plafond Kayu 1/4 Cm. 16,826.88
9 1 M' List Plafond Kayu Profil 4 cm H- 09 27,733.58
10 1 M' List Langit-langit Gypsum 10 cm H -10 28,457.09
11 1 M' Lisplang uk 2/10 + 2/15 cm, GRC tebal 8 mm. H -11 84,615.19
12 1 M2 Pasang kuda-kuda baja ringan (pabrikasi) 180,000.00
I. PEKERJAAN LANTAI
1 Memasang 1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia I - 01 177,137.86
2 Memasang 1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia I - 02 168,584.94
3 Memasang 1 M2 Lantai Keramik corak 30 x 30 cm setara Mulia I - 03 191,130.16
4 Memasang 1 M2 Lantai Keramik Corak 20 x 20 cm setara Roman I - 04 204,067.53
Memasang 1 M2 Lantai Keramik corak 30 x 30 cm setara Roman 251,583.57
Memasang 1 M2 dinding Keramik corak 20 x 25 cm setara Roman 218,990.93
1 M' Plint Keramik ukuran (10 x 25) cm 83,864.09
5 1 M' Plint Keramik ukuran (10 x 40) cm I - 05 19,428.17
6 1 M' Plint Keramik ukuran (10 x 30) cm I - 06 23,510.80
7 1 M' Plint Keramik ukuran (10 x 20) cm I - 07 33,253.10
8 Memasang 1 m' plint keramik ukuran (10 x 10) cm I - 08 22,317.80
9 Memasang 1 m' Plint keramik ukuran (5 x 20) cm I - 09 20,262.38
10 Memasang 1 m2 floor hardener I - 10 38,040.00
11 Memasang 1 M2 Paving Block Natural 8 cm I - 11 222,481.90
12 Memasang 1 M2 Paving Block Warna 8 cm I - 12 242,186.89
13 Memasang 1 M2 Paving Block Natural 6 cm I - 13 215,939.86
14 Memasang 1 M2 Paving Block Warna 6 cm I - 14 232,091.80
15 Memasang 1 M2 Glass Block 20 x 20 I - 15 639,808.37
16 Memasang 1 M2 Glass Block 30 x 30 I - 16 410,706.77
17 Pekerjaan bekisting untuk Lantai bahan Bondex I - 17 341,266.86
18 Lantai keramik polos 40x40 setara mulia l-38 170,017.60
J. PEKERJAAN KAYU
1 Memasang dan membuat 1 m3 Kusen Pintu & Jendela Kayu kelas 1 J-01 6,797,004.33
2 Membuat dan memasang 1 m3 Kusen Pintu & Jendela Kayu kelas II atau kelas III J-02 6,681,850.63
3 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II J-03 270,547.95
4 Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III untuk gudang sementara J-04 270,547.95
5 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II J-05 580,709.79
6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II J-06 437,265.88
7 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II J-07 649,151.42
8 Membuat dan memasang daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm) J-08 422,239.71
9 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II J-09 665,095.25
10 Memasang 1 m2 jalusi kusen, kayu kelas I atau II J-10 519,362.28
11 Memasang 1 m2 teakwood rangkap, rangka expose kayu kelas I J-11 614,419.05
12 Memasang 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II J-12 869,209.67
13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter J-13 6,413,718.81
14 Memasang 1 m3 konstruksi kuda-kuda expose, kayu kelas I J-14 7,942,105.11
15 Memasang 1 m3 konstruksi, gording kayu kelas II J-15 5,654,713.25
16 Memasang 1 m2 rangka atap genteng keramik, kayu kelas II J-16 101,102.82
17 Memasang 1 m2 rangka atap genteng beton, kayu kelas II J-17 101,189.69
18 Memasang 1 m2 rangka atap sirap, kayu kelas II J-18 571,288.67
19 Memasang 1 m2 rangka plafond (50 x 100) cm, kayu kelas II atau kelas III J-19 146,650.69
20 Memasang 1 m2 rangka plafond (60 x 60), kayu kelas II atau kelas III J-20 145,954.25
21 Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II J-21 65,135.87
22 Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II J-22 64,777.65
23 Memasang 1 m2 rangka dinding pemisah ( 60 x 120) cm, kayu kelas II atau III J-23 161,628.67
24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II J-24 409,552.71
25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II J-25 431,682.71
26 Memasang 1 m2 dinding lambrizing dari papan kayu kelas I J-26 288,513.39
27 Memasang 1 m2 dinding lambrizing dari plywood ukuran (120 x 240) cm J-27 115,950.02
28 Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV J-28 132,579.25
K. PEKERJAAN BESI DAN ALUMINIUM
Pembesian 1 kg dengan besi polos atau besi ulir HIT-1 11,820.95
1 Memasang 1 Kg Besi Profil K-01 23,305.88
2 Memasang 1 Kg Rangka kuda-kuda baja WF K-02 29,587.63
3 Mengerjakan 100 kg pekerjaan perakitan K-03 86,654.32
4 Membuat 1 m2 Pintu besi plat tebal 2 mm rangkap rangka baja siku K-04 1,616,570.04
5 Mengerjakan 10 cm pengelasan dengan las listrik K-05 136,746.09
6 Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm K-06 585,169.50
7 Memasang 1 m2 pintu rolling door besi K-07 893,339.83
8 Memasang 1 m2 pintu lipat (folding door) K-08 745,875.83
9 Memasang 1 m2 sunscreen alluminium K-09 674,398.29
10 Memasang 1 m2 rolling door alluminium K-10 704,494.05
11 Memasang 1 m kusen pintu alluminium K-11 54,457.80
12 Memasang 1 m2 pintu alluminium strip lebar 8 cm K-12 1,333,752.70
13 Memasang 1 m2 pintu kaca rangka alluminium K-13 3,066,586.67
14 Memasang 1 m2 Tirai (Venetion blinds and vertikal blinds) K-14 663,000.00
15 Memasang 1 m2 terali besi strip (2 x 3) mm K-15 823,036.87
16 Memasang 1 m2 Kawat Harmonika K-16 152,159.25
17 1 M2 Jendela Nako & Teralis (10 Klips) K-17 859,052.99
18 Memasang 1 m'Talang datar / jurai seng BJLS 28 lebar 90 cm K-18 155,017.67
19 Memasang 1 m' talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cm K-19 116,701.76
20 Pemasangan 1 m2 Aluminium Composite Panel K-20 524,697.00
L. PEKERJAAN KACA DAN KUNCI
1 Pasang 1 buah kunci tanam antik L-01 236,163.15
2 Pasang 1 buah Kunci Tanam Biasa L-02 204,919.10
3 Pasang 1 buah Kunci Tanam Kamar Mandi L-03 99,498.13
4 Pasang 1 buah Engsel Pintu L-04 31,439.32
5 Pasang 1 buah Engsel Pintu Klaim L-05 69,016.17
6 Pasang 1 buah Kait Angin Pintu L-06 39,980.98
7 Pasang 1 buah Door Closer L-07 749,139.72
8 Pasang 1 buah Door Holder L-08 108,789.29
9 Pasang 1 buah Door Stoper L-09 111,836.29
10 Pasang 1 buah Gerendel L-10 118,678.97
11 Memasang 1 m2 kaca polos tebal 2 mm L-11 161,908.66
12 Memasang 1 m2 kaca polos tebal 3 mm L-12 161,908.66
13 Memasang 1 m2 kaca polos tebal 3 mm dengan kisi-kisi L-13 191,522.36
14 Memasang 1 m2 kaca raiben tebal 5 mm L-14 236,461.20
15 Memasang 1 m2 kaca raiben tebal 12 mm L-15 1,058,873.00
16 Memasang 1 m2 kaca es tebal 5 mm L-16 309,646.84
17 Memasang 1 m2 kaca lukis L-17 199,095.90
M. PEKERJAAN SANITASI
1 Memasang 1 buah closet duduk M-01 2,370,071.80
2 Memasang 1 buah closet jongkok M-02 577,447.50
3 Memasang 1 buah Urinoir M-03 4,128,444.31
4 Memasang 1 buah Wastafel M-04 1,930,117.74
5 1 Buah bak Mandi Fibreglass Volume 0,30 m3 M-05 970,406.26
6 Memasang 1 buah bak mandi bata merah volume 0,3 m3 M-06 1,676,606.62
7 1 M' Saluran Air Limbah Buis Beton d = 30 cm - 60 cm M-07 243,750.11
8 Memasang 1 m pipa penyalur air limbah jenis pipa tanah M-08 58,972.14
9 Memasang 1 m3 pipa beton M-09 110,178.25
10 1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm M-10 804,274.69
11 1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm M-11 573,277.61
1 M2 Pasang sulingan + injuk 36,662.24
12 1 M' Pipa PVC θ 1/2" (AW) M-12 24,372.08
13 1 M' Pipa PVC θ 1" (AW) M-13 29,546.51
14 1 M' Pipa PVC θ 1 1/2" (AW) M-14 42,835.39
15 1 M' Pipa PVC θ 2" (AW) M-15 53,066.65
1 M' Pipa PVC θ 3" (AW) 103,179.06
16 1 M' Pipa PVC θ 4" (AW) M-16 151,748.14
1 M' Pipa PVC θ 6" (AW) 359,430.94
17 1 M' Pipa PVC θ 3/4" (AW) M-17 46,098.03
18 1 Buah Bak Cuci Piring Stainless Steel M-18 637,326.78
19 1 Buah Kran θ 1/2" - 3/4" M-19 59,481.43
20 1 Buah Floor Drain M-20 91,287.63
21 1 M' Grafel Beton U 30cm - 60cm M-21 101,540.33
22 1 M' Pasang Talang Plastik PVC U 15 cm (AW) M-22 155,307.71
23 1 M' Saluran Air Limbah Buis Beton θ 60 cm M-23 382,339.77
24 1 Buah Tangki Air Fiberglass Volume 1 M3 M-24 791,565.40
25 1 Unit Septictank 2 x 1,50 x 1,50 m + Rembesan M-25 8,743,094.81
26 1 Unit Septictank 1 x 1,50 x 1,50 m + Rembesan M-26 4,194,050.53
27 Pekerjaan Septictank Komunal (Bio Fill 5000 kap 3,6 m3) M-27 12,613,997.73
N. PEKERJAAN PENGECATAN
1 Mengikis/Mengerok 1 m2 Perawatan Cat Tembok Lama N-01 14,079.21
2 Mendempul dan Menggosok 1 m2 Kayu N-02 12,183.61
3 Mengecat 1 m2 Bidang Kayu Lama N-03 42,317.66
4 Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup) N-04 47,276.47
5 Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 3 lps cat penutup) N-05 64,090.62
6 Mengecat 1 m2 Tembok Lama (1 lps cat dasar, 2 lps cat penutup) N - 06 13,238.93
Mengecat 1 m2 Tembok Baru ACI (1 lps plamir, 1 lps cat dasar,3 lps cat penutup) 58,942.09
Mengecatan 1 m2 Plafond ACI (3x) 80,124.17
7 Mengecatan 1 m2 Plafond Vinilex (3x) N - 07 67,521.27
8 Mengecatan 1 m2 Plafond set Vinilex ( 2x) N - 08 45,014.18
9 Mengecat 1 m2 Tembok Baru Set Vinilex (1 lps plamir, 1 lps cat dasar,3 lps cat penutup) N - 09 36,749.10
10 Mengecat 1 m2 Tembok Baru Set Vinilex (1 lps plamir, 1 lps cat dasar,2 lps cat penutup) N - 09 27,597.21
11 Mengecatan 1 m2 Plafond (3x) luar 2 lantai / lebih N - 11 94,175.39
Mengecat 1 m2 Water proping 57,820.47

P. PEKERJAAN KUSEN ALUMUNIUM


1 1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu klas II 2,361,033.29
2 1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela 3,262,325.48
3 1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu ) 4,097,212.41
4 1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M' 2,225,203.21
5 1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku 1,440,620.04
6 1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M' (daun pintu besi plat tbl 2 mm) 3,598,083.83
7 1 UNIT Pekerjaan Kusen Pintu Alumunium KM/WC Lapis Formika uk. 0,8 X 2,70 M' 2,435,981.77
8 1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela 3,988,191.02
9 1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu ) 5,222,921.49
10 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu ) 3,124,365.71
11 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu ) 3,206,647.20
12 1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu ) 3,051,394.60
13 1 UNIT Pekerjaan Jalusi Alumunium Sofi-sofi 1,475,375.90
14 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m 753,213.64
15 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m 877,395.25
16 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m 1,253,189.68
17 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m 1,628,984.10
18 1 UNIT Pek. Kusen Jendela Alm.uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela tampa BV 3,269,297.28
19 1 UNIT Pek. Kusen Pintu & Jendela Alm.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu ) tampa BV 2,543,049.99
20 1 UNIT Pek. Kusen Jendela Alm.uk. 2,00 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela tampa BV 2,924,929.54
21 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,00 M' ( 2 Daun Pintu )tampa BV 2,890,879.37
22 1 UNIT Pek. Kusen Pintu & Jendela Alum uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu ) tampa BV 4,093,474.01
23 1 UNIT Pek. Kusen Pintu & Jendela Alm.3,1 X 2,70 M' ( 2 lb. Jendela + 2 lb. Pintu ) 5,521,815.05
24 1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu ) 3,432,235.71
C. HARGA SATUAN DASAR BAHAN DAN MATERIAL

STANDAR BIAYA BAHAN/MATERIAL BANGUNAN

HARGA
NO BAHAN / MATERIAL SPESIFIKASI BAHAN SAT SATUAN HARGA
KONTRAKTUAL

A. Agregat Kasar, Bahan Perekat & Bahan Jadinya TAHUN 2016.

1 Pasir Urug m3 237518.33 235,143.15


2 Tanah Urug Pilihan m3 203,743.18 201,705.75
3 Sirtu m3 265,751.97 263,094.45
4 Pasir Teras m3 229,276.21 226,983.45
5 Pasir Pasang Kali m3 320,465.61 317,260.95
6 Pasir Beton m3 359,546.79 355,951.32
7 Abu Batu m3 330,887.26 327,578.39
8 Koral Beton m3 239,697.86 237,300.88
9 Batu Gosok (Apung) Kg 33,140.84 32,809.43
10 Batu Pecah Mesin 1/2 m3 349,125.14 345,633.89
11 Batu Pecah Mesin 2/3 m3 386,382.53 382,518.70
12 Batu Pecah Mesin 3/5 m3 325,676.44 322,419.68
13 Batu Pecah Mesin 5/7 m3 312,649.38 309,522.89
14 Batu Belah Pondasi m3 294,411.50 289,467.39
15 Batu Bronjol (Untuk Bronjong) m3 342,351.07 338,927.56
16 Batu Koral Beton Kali m3 350,688.39 347,181.51
17 Batu Tempel Hitam m2 294,932.58 291,983.25
18 Batu Pinggir Beton 10 x 20 x 35 buah 24,692.50 24,445.58
19 Batu Pinggir Beton 15 x 35 x 50 K-225 buah 88,893.00 88,004.07
20 Batu Telor m3 124,168.00 122,926.32
21 Batako Kecil 8 x 10 x 20 buah 2,586.83 2,560.97
22 Batako Besar 8 x 20 x 30 buah 3,527.50 3,492.23
23 Con Block 8 x 20 x 40 buah 7,407.75 7,333.67
24 Bata Merah Bakar Kelas I buah 1,152.32 1,140.79
25 Bata Merah Bakar Kelas II buah 905.39 896.336100
26 Bata Merah Oven (Klingker) buah 1,224.54 1,212.29
27 Bata Ringan buah 10,217.61 10,115.43
Bata hebel 5,502.60
28 Rooster Beton 20 x 20 buah 13,263.40 13,130.77
29 Rooster Beton 30 x 30 buah 9,877.00 9,778.23
30 Rooster Jalusi 39 x 18,5 x 9 buah 11,993.50 11,873.57
31 Rooster Motif 20 x 20 buah 25,398.00 25,144.02
32 Rooster Polos 20 x 20 buah 20,812.25 20,604.13
33 Rooster Silang 20 x 20 buah 23,634.25 23,397.91
34 Rooster Espana buah 31,747.50 31,430.03
35 Rooster / Bata Kerawang buah 8,254.35 8,171.81
36 Rooster Keramik 30 x 30 buah 49,385.00 48,891.15
37 Rooster Keramik 20 x 20 buah 35,275.00 34,922.25
38 Rooster Keramik 18 x 18 buah 33,158.50 32,826.92
39 Grass Block 20 x 20 buah 21,494.23 21,279.29
40 Grass Block 30 x 30 buah 24,974.70 24,724.95
41 Paving Blok Natural 8 cm m2 114,667.27 113,520.59
42 Paving Blok Warna 8 cm m2 134,374.23 133,030.49
43 Paving Blok Natural 6 cm m2 108,124.58 107,043.33
44 Paving Blok Warna 6 cm m2 124,278.13 123,035.35
45 Canstin Paving Blok m' 110,481.30 109,376.49
46 Semen PC/ 50 Kg zak 98,713.89 90,000.00
47 Semen Putih zak 144,600.34 143,154.34
48 Semen Mortar Utama (MU) Zak 93,794.81 92,856.86
49 Kanstin Jalan Ukuran Besar (Bina Marga) 1 buah = 60 cm buah 65,000.00 64,350.00
50 Readymix Beton K550, Tanpa Pompa (Selang) m3 1,622,650.00 1,606,423.50
51 Readymix Beton K500, Tanpa Pompa (Selang) m3 1,552,100.00 1,536,579.00
52 Readymix Beton K400, Tanpa Pompa (Selang) m3 1,340,450.00 1,327,045.50
53 Readymix Beton K350, Tanpa Pompa (Selang) m3 1,251,086.67 1,238,575.80
54 Readymix Beton K300, Tanpa Pompa (Selang) m3 1,213,460.00 1,201,325.40
55 Readymix Beton K250, Tanpa Pompa (Selang) m3 1,171,130.00 1,159,418.70
56 Readymix Beton K225, Tanpa Pompa (Selang) m3 1,304,959.58 1,291,909.98
57 Readymix Beton K175, Tanpa Pompa (Selang) m3 1,186,270.85 1,174,408.14
58 Readymix Beton K125, Tanpa Pompa (Selang) m3 1,133,015.07 1,121,684.92
59 Readymix Beton K100, Tanpa Pompa (Selang) m3 1,068,007.17 1,057,327.10
60 Kapur Pasang/kapur Tembok m3 91,180.12 90,268.32
61 Kapur Sirih kg 13,169.33 13,037.64
62 Semen warna kg 15,111.39 14,960.28
63 Tanah Liat m3 76,723.13 75,955.89
64 Air liter 5.00 4.95
65 Formite/spacer buah 31,264.94 30,952.29
66 Hollow/Con Blok 8 x 20 x 40 buah 6,135.74 6,074.38
67 Hollow/Con Blok 8 x 15 x 40 buah 7,190.94 7,119.03
68 Hollow/Con Blok 8 x 10 x 40 buah 6,643.80 6,577.36
69 Semen Nat kg 9,971.10 9,871.39
70 Kapur padam m3 100,298.19 99,295.21
71 Semen merah m3 332,370.00 329,046.30
72 kerikil kg 177.55 175.78
73 Batu Granit kg 4,320.81 4,277.60
74 Batu Teraso kg 2,658.96 2,632.37
75 alat bantu lot 73,121.40 72,390.19
76 alat bantu / steger bambu lot 1,818.18 1,800.00
B. Laburan, Pengisi dan Alatnya 0
1 Plamir Tembok kg 56,667.70 56,101.02
2 Cat Tembok ICI Eksterior (Beton) liter 130,517.50 129,212.33
3 Cat Tembok ICI Interior (Plafon dan Dinding) liter 91,715.00 90,797.85
4 Cat Tembok Vinilex kg 30,900.00 33,892.76
5 Cat dasar ICI untuk Interior (2 pelapis) liter 23,969.78 23,730.08
6 Cat Tembok Sanlex kg 23,969.78 23,730.08
7 Cat dasar kg 37,205.28 36,833.23
8 Cat Tahan Asam liter 126,990.00 125,720.10
9 Cat Genteng liter 65,611.50 64,955.39
10 Weatershield liter 303,365.00 300,331.35
11 Pelapis Alkali ICI (Cat Dasar Beton Eksterior) kg 190,485.00 188,580.15
12 Cat Marka/Spotlight kg 117,254.10 116,081.56
13 Water Profing Emulsion kg 90,304.00 89,400.96
14 Water Profing Membrance ml 112,880.00 111,751.20
15 Rol Cat Tembok buah 39,081.17 38,690.36
16 Kape Tembok buah 14,069.22 13,928.53
17 Kape Kayu buah 11,724.35 11,607.11
18 Soligneum 1 blek kg 39,508.00 39,112.92
19 Plincote m3 38,449.75 38,065.25
20 Pengawetan Kayu m3 423,300.00 419,067.00
21 Pengopenan Kayu buah 634,950.00 628,600.50
22 Kwas 3" buah 20,322.21 20,118.99
23 Oker bks 25,398.00 25,144.02
24 Oyan bks 2,822.00 2,793.78
25 Oten (Pewarna Plitur) liter 5,644.00 5,587.56
26 Spirtus kg 14,815.50 14,667.35
27 Bahan Pelitur Kripik (Sirlak India) kg 64,906.00 64,256.94
28 Dempul Lilin kg 38,802.50 38,414.48
29 Dempul Plitur kg 43,741.00 43,303.59
30 Dempul Halus / Impra (Wood Filler) liter 38,097.00 37,716.03
31 Dempul Jadi kg 35,275.00 34,922.25
32 Politur liter 64,906.00 64,256.94
33 Politur Jadi liter 66,317.00 65,653.83
34 Terpentin kg 20,459.50 20,254.91
35 Tiner A kg 28,220.00 27,937.80
36 Tiner B liter 23,987.00 23,747.13
37 Kumpon lbr 93,831.50 92,893.19
38 Melamik kg 67,728.00 67,050.72
39 Dempul Plastik kg 61,378.50 60,764.72
40 Dempul Duco kg 40,919.00 40,509.81
41 Ampelas lbr 4,689.74 4,642.84
42 Dempul kayu cap Kucing kg 35,173.05 34,821.32
43 Meni Kayu / Besi kg 27,356.82 27,083.25
44 Sincromat kg 46,563.00 46,097.37
45 Cat Kayu Sieve liter 76,208.29 75,446.21
46 Cat Besi liter 72,300.17 71,577.17
47 Cat Besi Duco Danaglos / ICI buah 112,880.00 111,751.20
48 Cat Bron kg 88,187.50 87,305.63
49 Karet Lis buah 21,165.00 20,953.35
50 Minyak Cat kg 39,081.17 38,690.36
51 Glass Beet kg 25,398.00 25,144.02
52 Residu liter 39,081.17 38,690.36
54 Vernis ltr 104,300.00 103,257.00
55 Kuas Roll 9" buan 27,697.50 27,420.53
55 Plastik m2 12,500.00
C. BAHAN KAYU BERIKUT BAHAN JADINYA 0
1 Bambu 5 s/d 7 btg 15,000.00 14,850.00
2 Bambu 7 s/d 10 btg 45,348.38 44,894.90
3 Bambu Gombong btg 53,712.07 53,174.95
4 Kayu Kamper Singkil / kapur Kayu Samarinda Kls II m3 8,867,664.67 8,778,988.02
5 Kayu Balok Borneo Super m3 6,758,437.43 6,690,853.06
6 Kayu Papan Borneo Super m3 6,930,394.59 6,861,090.64
7 Kayu Balok Kamper Medan (Kruing) m3 8,075,623.33 7,994,867.10
8 Kayu Papan Kamper Medan (Kruing) m3 8,748,200.00 8,660,718.00
9 Kayu Balok Kamper Banjar m3 8,040,348.33 7,959,944.85
10 Kayu Papan Kamper Banjar m3 8,604,748.33 8,518,700.85
11 Kayu Balok Kamper Samarinda m3 10,606,016.67 10,499,956.50
12 Kayu Papan Kamper Samarinda m3 11,290,822.00 11,177,913.78
13 Kayu Balok Rasamala m3 3,922,580.00 3,883,354.20
14 Kayu Jati Jatim Tua dia. 40 cm m3 14,506,961.33 14,361,891.72
15 Kayu Jati Jateng Tua 40 cm m3 22,719,922.00 22,492,722.78
16 Kayu Jati Jabar Tua dia. 40 cm m3 11,982,212.00 11,862,389.88
17 Kayu Jati Jabar Tua dia. 40 cm Kebawah m3 10,380,021.50 10,276,221.29
18 Kayu Hutan Kelas I Segeng, Mahoni, Laban m3 3,527,500.00 3,492,225.00
19 Kayu Balok Albasia Kayu Balok Albasia m3 3,126,493.80 3,095,228.86
20 Kayu Papan Albasia Kayu Papan Albasia m3 3,282,818.49 3,249,990.31
21 Dolken 5 s/d 7 Dolken 5 s/d 7 btg 21,306.10 21,093.04
22 Dolken 7 s/d 10 Dolken 7 s/d 10 btg 24,373.80 24,130.06
23 List kayu 1/4 cm 1 cm m' 6,000.00 5,940.00
23 List Profil Kamper 1 cm 1 cm m' 13,131.27 12,999.96
24 List Profil Kamper 2 cm 2 cm m' 15,788.79 15,630.90
25 List Profil Kamper 4 cm 4 cm m' 17,195.72 17,023.76
26 List Profil Kamper 5 cm 5 cm m' 33,088.73 32,757.84
27 List Profil Kamper 10 cm 10 cm m' 60,966.63 60,356.96
28 Pegangan Tangga Profil Jati m' 177,550.83 175,775.33
29 Pegangan Tangga Profil Kamper m' 68,433.50 67,749.17
30 Kayu Kaso 4/6 m3 5,471,364.15 5,416,650.51
31 Kayu Kaso 5/7 m3 5,471,364.15 5,416,650.51
32 Kayu Reng 2/3 Borneo Super m' 24,373.80 24,130.06
33 Kayu Reng 2/3 Kamper Banjar m' 11,079.00 10,968.21
34 Kayu Reng 3/4 Kamper Banjar m' 38,776.50 38,388.74
35 Kayu Papan Terentang m3 3,345,348.37 3,311,894.89
36 Kayu Balok Terentang m3 2,462,113.87 2,437,492.73
37 Batang Kelapa btg 846,600.00 838,134.00
38 Tali Ijuk kg 23,448.70 23,214.21
39 Lapisan Ijuk tebal 10 cm tebal 10 cm m2 23,448.70 23,214.21
40 Venetion Blind m2 268,090.00 265,409.10
41 Vertikal Blind m2 615,196.00 609,044.04
42 Kayu papan Kelas I m3 3,323,700.00 3,290,463.00
43 Kayu Balok Kelas I m3 3,323,700.00 3,290,463.00
44 Kayu Papan Kelas II m3 2,880,540.00 2,851,734.60
45 Kayu Balok Kelas II m3 2,769,750.00 2,742,052.50
46 Kayu papan Kelas III m3 1,661,850.00 1,645,231.50
47 Kayu Balok Kelas III m3 1,661,850.00 1,645,231.50
48 Dolken Kayu Galam Panjang 4 meter ukuran 8-10 btg 24,373.80 24,130.06
49 Kayu Papan 3/20 4 m 40 m3 2,326,590.00 2,303,324.10
-
D. BAHAN PENUTUP RANGKA PLAFOND 0
1 Plafond Enternit 4 mm m2 31,264.94 30,952.29
2 Plafond Hardpleks 5 mm 120 x 240 lbr 89,105.07 88,214.02
3 Plafond Asbes Semen 5 mm m2 80,507.22 79,702.15
4 Plafond Asbes Semen 3,5 mm m2 25,011.95 24,761.83
5 Gypsum 120 x 240 t = 9 mm ex DN lbr 97,702.93 96,725.90
6 Gypsum 120 x 240 t = 9 mm ex Luar lbr 118,806.76 117,618.69
7 Tepung Gypsum kg 78,162.35 77,380.73
8 Acustik Amstrong 60 x 120 lbr 208,122.50 206,041.28
9 Cotton Plester buah 15,632.47 15,476.15
10 GRC (120 x 240) cm, t = 4 mm lbr 80,507.22 79,702.15
11 Cornice Coumpound zak 132,875.99 131,547.23
12 List Gypsum m' 6,252.99 6,190.46

E. BAHAN KAYU LAPIS

1 Triplek 3 mm 120 x 240 lbr 74,775.31 74,027.56

2 Triplek 4 mm 120 x 240 lbr 94,055.36 93,114.81

3 Triplek 4 mm ukuran pintu lbr 71,909.36 71,190.27

4 Triplek 6 mm 120 x 240 lbr 139,128.97 137,737.68

5 Triplek 9 mm 120 x 240 lbr 204,785.34 202,737.49

6 Jabar Wood 4 mm lbr 145,381.96 143,928.14


7 Bilik Bambu (Tanpa Kulit) m2 28,138.44 27,857.06
8 Bilik Bambu (dengan Kulit) m2 35,954.68 35,595.13
9 Bilik Bambu Hitam Variasi m2 44,552.54 44,107.01
10 Wall Paper (kelas Biasa) m2 39,081.17 38,690.36
11 Wall Paper (kelas Menengah/sedang) m2 97,702.93 96,725.90
12 Wall Paper (kelas Baik) m2 148,508.46 147,023.38
13 Multiplek 9 mm 120 x 240 lbr 215,728.07 213,570.79
14 Multiplek 12 mm 120 x 240 lbr 282,947.69 280,118.21
15 Multiplek 18 mm 120 x 240 lbr 385,340.36 381,486.96
16 Plywood 18 mm 120 x 240 lbr 444,743.74 440,296.30
17 Plywood 9 mm 120 x 240 lbr 195,405.86 193,451.80
18 Plywood 4 mm 120 x 240 lbr 261,675.81 259,059.05
19 TeakWood 3 mm 120 x 240 lbr 103,174.30 102,142.56
20 TeakWood 4 mm 120 x 240 lbr 183,681.51 181,844.69
21 TeakWood 3 mm 120 x 240 Uk. Pintu lbr 148,508.46 147,023.38
22 TeakWood ukuran pintu 4 mm lbr 138,347.35 136,963.88
23 Tacon (Bahan Bakar) m2 146,143.59 144,682.15
24 Supercon m2 82,852.09 82,023.57
25 Melamin 4 mm 120 x 240 lbr 144,600.34 143,154.34
26 Melamin TOK 4 mm lbr 206,348.59 204,285.10
27 Formika 120 x 240 lbr 251,682.75 249,165.92
28 Formika Ukuran Pintu lbr 190,716.12 188,808.96
29 Formika Warna 4" x 8" lbr 3,349,073.03 3,315,582.30
-
F. BAHAN LANTAI DAN PELAPIS DINDING 0
1 Tegel PC 20 x 20 20 x 20 buah 1,566.21 1,550.55
2 Plin Tegel PC 20 x 20 20 x 20 buah 1,298.12 1,285.14
3 Tegel PC 30 x 30 30 x 30 buah 3,200.93 3,168.92
4 Plin Tegel PC 15 x 30 15 x 30 buah 999.46 989.47
5 Tegel Warna 20 x 20 20 x 20 buah 3,703.88 3,666.84
6 Plin Tegel Warna 10 x 20 10 x 20 buah 1,500.00 1,485.00
7 Tegel Warna 30 x 30 30 x 30 buah 4,233.00 4,190.67
8 Plin Tegel Warna 15 x 30 15 x 30 buah 1,148.60 1,137.11
9 Tegel Wafel PC 20 x 20 20 x 20 buah 4,671.82 4,625.10
10 Tegel Wafel Warna 20 x 20 20 x 20 buah 3,527.50 3,492.23
11 Tegel Badak PC 30 x 30 30 x 30 buah 5,323.70 5,270.47
12 Poslin 11 x 11 warna standar DN 11 x 11 warna standar DN buah 1,411.00 1,396.89
13 Poslin 11 x 11 Warna Khusus DN 11 x 11 Warna Khusus DN buah 1,411.00 1,396.89

10 x 20 dan 20 x 20 KW 1 DN
14 Keramik buah 3,094.75 3,063.80
Putih/polos Mulia

10 x 20 KW 1 Corak/Warna/ Anti
15 Keramik buah 2,920.00 2,890.80
slip Mulia

20 x 20 (KM) KW 1 DN
16 Keramik buah 3,126.49 3,095.23
Corak/Warna/Anti Slip Mulia

20 x 20 (KM) KW 1 DN Putih
17 Keramik buah 3,204.62 3,172.57
polos Mulia

20 x 25 Dinding (KM) KW 1 DN
18 Keramik buah 4,103.51 4,062.47
Corak Mulia

20 x 25 Dinding (KM) KW 1 DN
Keramik buah 4,103.51 4,431.79
Corak roman

30 x 30 KW 1 Dn Putih Polos
19 Keramik buah 6,466.16 6,401.50
Mulia

30 x 30 KW 1 Warna/Corak (Anti
20 Keramik buah 8,384.69 8,300.84
Slip) Mulia

40 x 40 KW 1 DN Putih Polos
21 Keramik buah 12,505.98 12,380.92
Mulia

40 x 40 KW 1 DN Warna/Corak
22 Keramik buah 15,111.39 14,960.28
(Anti Slip) Mulia

10 x 20 dan 20 x 20 KW 1 DN
23 Keramik buah 2,822.00 2,793.78
Putih/polos Roman

10 x 20 KW 1 DN
24 Keramik buah 3,259.41 3,226.82
Corak/Warna/Anti Slip Roman

20 x 20 (KM) KW 1 DN
25 Keramik buah 3,866.14 3,827.48
Corak/Warna/Anti Slip Roman

20 x 20 (KM) KW 1 Dn Putih
26 Keramik buah 5,079.60 5,028.80
Polos Roman

20 x 25 Dinding (KM) KW 1 DN
27 Keramik buah 3,950.80 3,911.29
Coarak Roman

28 Keramik 30 x 30 KW 1 DN Polos Roman buah 9,428.05 9,333.77

30 x 30 KW 1 DN Warna/Corak
29 Keramik buah 7,439.82 7,365.42
(Anti Slip) Roman

30 Keramik 40 x 40 KW 1 DN Polos Roman buah 11,523.17 11,407.94

40 x 40 KW 1 DN Warna/Corak
31 Keramik buah 8,979.09 8,889.30
(Anti Slip) Roman

32 Keramik 60 x 60 (Masterina Polos) buah 30,571.67 30,265.95


33 Keramik 60 x 60 (Masterina Corak) buah 37,302.14 36,929.12
34 Keramik 60 x 60 (Masterina Muda) buah 50,448.42 49,943.94
35 Keramik 60 x 60 (Masterina Tua) buah 52,186.78 51,664.91
36 Keramik 60 x 60 (Roman Polos) buah 40,416.67 40,012.50
37 Keramik 60 x 60 (Roman Corak) buah 47,551.17 47,075.66
38 Keramik 60 x 60 (KIA Polos) buah 31,000.00 30,690.00
39 Keramik 60 x 60 (KIA Corak) buah 33,028.69 32,698.40
40 Keramik 60 x 60 (Mulia Polos) buah 32,299.28 31,976.29
41 Keramik 60 x 60 (Mulia Corak) buah 36,311.62 35,948.50
42 Plin Keramik 60 x 60 buah 48,021.97 47,541.75
43 Plin Ubin Granito 10 x 60 cm (berbagai ukuran) buah 5,910.40 5,851.30
44 Stepnosing Keramik (Berbagai ukuran) buah 6,000.00 5,940.00
45 Stepnosing Granito (kelas Baik) buah 6,036.43 5,976.07
46 Vinyl Lantai Dasar m2 86,917.60 86,048.42
47 Karpet kelas baik LN m2 1,534,095.64 1,518,754.68
48 Karpet Kelas sedang LN m2 511,035.98 505,925.62
49 Parquet Jati m2 468,159.92 463,478.32
50 Stairnosing Keramik 10/20 buah 1,675.35 1,658.60
51 Stairnosing Fiber m 24,880.16 24,631.36
52 Taraso Kerang 30 x 30 m2 41,503.15 41,088.12
53 Plin Taraso 10 x 30 buah 34,441.10 34,096.69
54 Graniit Alam LN Ukuran Besar m2 1,975,400.00 1,955,646.00
55 Graniit Alam LN Ukuran Kecil m2 917,150.00 907,978.50
56 Graniit Alam DN Ukuran Besar m2 1,889,075.02 1,870,184.27
57 Graniit Alam DN Ukuran Kecil m2 1,650,130.64 1,633,629.33
58 Granito Tile Essenza ukuran 40 x 40 Polis m2 113,820.67 112,682.46
59 Granito Tile Essenza ukuran 30 x 30 m2 93,126.00 92,194.74
60 Granito Tile Essenza ukuran 40 x 40 Unpolis m2 95,242.50 94,290.08
61 Marmer m2 660,065.80 653,465.14
62 Marmer Alam Lampung ukuran Besar m2 772,522.50 764,797.28
63 Marmer Alam Lampung ukuran Kecil m2 613,785.00 607,647.15
64 Marmer Alam ukuran Besar m2 518,542.50 513,357.08
65 Marmer Alam ukuran Kecil m2 317,475.00 314,300.25
66 Marmer Sintesis m2 285,727.50 282,870.23
67 Granito Tile Essenza 60 x 60 Polis m2 677,280.00 670,507.20
68 Granito Tile Essenza 60 x 60 Unpolis m2 571,455.00 565,740.45
69 Batu Tempel Hitam m2 294,932.58 291,983.25
70 Bata Karawang buah 23,793.69 23,555.76
71 Campuran untuk Kedap Air (AM) liter 493,800.62 488,862.61
72 Plin Keramik 10 x 20 buah 18,343.00 18,159.57
73 Plin Keramik 10 x 25 buah 18,343.00 18,159.57
74 Plin Keramik 10 x 30 buah 18,343.00 18,159.57
75 Plin Keramik 10 x 40 buah 5,975.59 5,915.83
76 Plin Keramik 15 x 30 buah 6,410.17 6,346.07
77 Plin Keramik 15 x 40 buah 2,328.15 2,304.87
78 Plin Granito 10 x 30 buah 13,472.23 13,337.51
79 Plin Granito 10 x 40 buah 14,993.29 14,843.35
80 Plin Granito 15 x 30 buah 16,514.34 16,349.20
81 Plin Granito 15 x 40 buah 21,294.81 21,081.86
82 Keramik Artistik 10 X 20 Cm buah 960.00 950.40
83 Keramik Artistik 5 X 20 Cm buah 1,860.00 1,841.40
84 Ubin Keramik 10 x 20 buah 1,050.00 1,039.50
85 Ubin Keramik (10 x 10) atau (5 x 20) cm buah 560.00 554.40
86 Ubin Keramik 33 x 33 cm buah 4,500.00 4,455.00
87 Ubin Keramik 10 x 33 cm, variasi/border buah 1,400.00 1,386.00
88 Mozaik 30 x 30 Cm buah 30,000.00 29,700.00
89 Ubin Teraso 30 x 30 Cm buah 5,348.00 5,294.52
90 underlayer / Rubber Corrugated m2 85,000.00 84,150.00
91 Gymfloor m2 125,000.00 123,750.00
92 Vinyl buah 17,000.00 16,830.00
93 Vinyl karet (15 x 30) cm buah 55,000.00 54,450.00
94 Vinyl Kayu Kelas II (2 x 10) cm m2 7,750,000.00 7,672,500.00
95 Floor hardener kg 28,000.00 27,720.00
96 Plin Keramik Artistik 10 x 10 cm buah 10,000.00 9,900.00
97 Plin Keramik Artistik 5 X 20 Cm buah 5,000.00 4,950.00
98 Plin Teraso 10 X 30 Cm buah 3,480.00 3,445.20
99 Internal cove (5 x 5 x20) cm buah 6,500.00 6,435.00
G. BAHAN SALURAN AIR KOTOR / BERSIH 0
1 Grafel U 20 cm' m' 42,330.00 41,906.70
2 Grafel U 30 cm' m' 56,440.00 55,875.60
3 Grafel U 40 cm' m' 126,990.00 125,720.10
4 Buis Beton 20 cm (1 m') m' 66,787.33 66,119.46
5 Buis Beton 30 cm (1 m') m' 92,890.83 91,961.93
6 Buis Beton 40 cm (1 m') m' 122,757.00 121,529.43
7 Buis Beton 50 cm (1 m') stk 169,320.00 167,626.80
8 Buis Beton 60 cm (1 m') stk 221,997.33 219,777.36
9 Buis Beton 100 cm (0.50 m') stk 564,400.00 558,756.00
10 Buis Beton 80 cm (0.50 m') stk 409,190.00 405,098.10
11 Buis Tanah 10 cm (0.50 m') stk 16,932.00 16,762.68
12 Buis Tanah 15 cm (0.50 m') stk 21,165.00 20,953.35
13 Buis Tanah 20 cm (0.50 m') stk 28,220.00 27,937.80
14 Buis Tanah 25 cm (0.50 m') stk 35,275.00 34,922.25
15 Injuk Gulung 9,524.25 9,429.01
-
H. BAHAN LOGAM DAN BAHAN JADINYA 0
1 Besi Beton U-24 Rata-rata kg 9,645.92 9,549.46
2 Besi Beton U-39 / U-32 Rata-rata kg 21,400.00 21,186.00
3 Besi Beton U-24 dia. 10 mm, panjang 12 m btg 72,013.50 71,293.37
4 Besi Beton U-24 dia. 12 mm, panjang 12 m btg 105,200.50 104,148.50
5 Besi Beton U-24 dia. 16 mm, panjang 12 m btg 182,803.50 180,975.47
6 Besi Beton U-24 dia. 19 mm, panjang 12 m btg 242,076.15 239,655.39
7 Besi Beton Ulir 12 mm 149,805.95 -
8 Besi Beton Ulir 16 mm 22,323,166.00 -
9 Pagar BRC lengkap tiang (tanpa Pondasi) m2 195,405.86 193,451.80
10 Bondek m2 184,135.50 182,294.15
11 Besi WF ex DN SII kg 15,163.49 15,011.86
12 Besi WF ex Jepang kg 29,008.75 28,718.66
13 Besi Profil Dn SII kg 15,521.00 15,365.79
14 Besi Profil ex LN kg 18,343.00 18,159.57
15 Besi C Lip Chanel kg 17,195.72 17,023.76
16 Ongkos Galfanis Besi kg 22,815.87 22,587.71
17 Kawat Beton kg 23,448.70 23,214.21
18 Kawat Duri kg 57,058.51 56,487.92
19 Kawat Pengikat m' 16,932.00 16,762.68
20 Kawat Bronjong 4 mm kg 35,173.06 34,821.33
21 Kawat Tembaga kg 37,038.75 36,668.36
22 Ram Nyamuk Hijau m2 32,100.25 31,779.25
23 Ram Kawat 1 x 1 (Putih) m2 21,517.75 21,302.57
24 Ram Ayam m2 22,276.27 22,053.51
25 Kawat Kasa 1 x 1 (Putih) m2 26,223.47 25,961.24
26 Kawat Harmonika 4 cm m2 42,989.29 42,559.40
27 Kawat Harmonika 2 cm m2 53,932.02 53,392.70
28 Kawat Las Listrik kg 42,989.29 42,559.40
29 Wiremess M8 m2 527,595.83 522,319.87
30 Wiremess M6 m2 297,015.50 294,045.35
31 Timah kg 35,275.00 34,922.25
32 Timah Hitam kg 56,440.00 55,875.60
33 Ram Nyamuk Alluminium m2 31,264.94 30,952.29
34 Plat Strip θ 2 x 30 mm (6 m') θ 2 x 30 mm (6 m') btg 50,023.90 49,523.66
35 Plat Strip θ 3 x 30 mm (6 m') θ 3 x 30 mm (6 m') btg 68,001.24 67,321.23
36 Plat Strip btg 54,407.25 53,863.18
37 Besi Strip kg 61,509.08 60,893.99
38 Plat Alluminium 0.2 mm 0.2 mm m2 82,543.50 81,718.07
39 Plat Alluminium 0.3 mm 0.3 mm m2 148,155.00 146,673.45
40 Plat Alluminium 0.4 mm 0.4 mm m2 180,608.00 178,801.92
41 Plat Alluminium 0.5 mm 0.5 mm m2 214,472.00 212,327.28
42 Plat Alluminium 0.6 mm 0.6 mm m2 248,336.00 245,852.64
43 Plat Alluminium 0.1 mm 0.1 mm m2 70,550.00 69,844.50
44 Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") 1.3 mm t = 1,3 mm (4") m' 157,176.47 155,604.71
45 Kusen Aluminium Warna 1.3 mm t = 1,3 mm (4") 1.3 mm t = 1,3 mm (4") m' 191,948.75 190,029.26
46 Kusen Aluminium Natural 1.3 mm t = 1,3 mm (3") 1.3 mm t = 1,3 mm (3") m' 133,934.93 132,595.58
47 Kusen Aluminium Warna 1.3 mm t = 1,3 mm (3") 1.3 mm t = 1,3 mm (3") m' 128,259.58 126,976.98
48 Daun Jendela Aluminium Natural (tanpa kaca dan accesoris) m' 98,900.00 97,911.00
49 Daun Jendela Aluminium Warna (tanpa kaca dan accesoris) m2 448,230.78 443,748.47
50 Daun Pintu Aluminium Natural (tanpa kaca dan accesoris) m2 448,332.34 443,849.02
51 Daun Pintu Aluminium Warna (tanpa kaca dan accesoris) m2 537,937.33 532,557.96
52 Pintu PVC (Kualitas Sedang) buah -
53 Pintu PVC (Kualitas Baik) buah 371,943.33 368,223.90
54 Handle Aluminium (Tarikan Pintu Aluminium) buah 352,750.00 349,222.50
55 Kait angin Aluminium ps 155,691.15 154,134.24
56 Karet Accesoris Kusen/Pintu Aluminium m' 30,638.45 30,332.07
57 Jalusi Aluminium m' 67,194.13 66,522.19
58 Sunscreen Aluminium m2 577,776.05 571,998.29
59 Seng Plat BJLS 30 60 cm (100 m') 30 60 cm (100 m') roll 23,448.70 23,214.21
60 Seng Plat BJLS 30 90 cm (100 m') 30 90 cm (100 m') roll 35,954.68 35,595.13
61 Plat Besi Tipis 1 mm 1 mm kg 19,754.00 19,556.46
62 Besi Pelat (1,2 x 3) mm 3 mm kg 18,758.96 18,571.37
63 Plat Besi 2 mm s/d 5 mm 2 mm s/d 5 mm kg 18,758.96 18,571.37
64 Plat Besi 6 mm s/d 10 mm 6 mm s/d 10 mm kg 18,758.96 18,571.37
65 Plat Besi 10 mm keatas 10 mm keatas kg 18,758.96 18,571.37
66 Kabel Presstress polos kg 39,962.84 39,563.21
67 Jaring Kawat baja kg 111,342.26 110,228.84
68 Lem Kuning (Aibond) kg 98,484.55 97,499.70
69 Lem Fox kg 45,334.16 44,880.82
70 Lem Vinyl kg 28,220.00 27,937.80
71 Besi Strip Kaca Nako kg 50,086.27 49,585.40
72 Profil Aluminium m' 28,286.95 28,004.08
73 Besi Hollow ( 2 x 4 x 4 ) cm (400 cm) ( 2 x 4 x 4 ) cm (400 cm) btg 17,195.72 17,023.76
74 Besi Hollow 4 x 4 cm (400 cm) 4 x 4 cm (400 cm) btg 40,644.42 40,237.98
75 Besi Rail Pengamanan kg 706,205.50 699,143.45
76 Jendela Besi m2 493,850.00 488,911.50
77 Jendela Besi Tahan Api m2 663,522.75 656,887.52
78 Pintu Gulung Besi m2 662,121.04 655,499.83
79 Pintu Rolling Door m2 504,135.40 499,094.05
80 Jendela Nako Kaca Ryben + Tralis 6 klips set 303,203.46 300,171.43
81 Jendela Nako Kaca Ryben + Tralis 7 klips set 304,172.80 301,131.07
82 Jendela Nako Kaca Ryben + Tralis 8 klips set 337,814.57 334,436.42
83 Jendela Nako Kaca Ryben + Tralis 10 klips set 471,450.38 466,735.87
84 Jendela Nako Kaca Bening + Tralis 4 klips set 209,300.69 207,207.68
85 Jendela Nako Kaca Bening + Tralis 5 klips set 206,739.72 204,672.32
86 Jendela Nako Kaca Bening + Tralis 6 klips set 244,106.53 241,665.46
87 Jendela Nako Kaca Bening + Tralis 7 klips set 313,136.18 310,004.81
88 Jendela Nako Kaca Bening + Tralis 8 klips set 333,507.49 330,172.41
89 Jendela Nako Kaca Bening + Tralis 10 klips set 424,887.38 420,638.50
90 Hollow 60 x 60 x 1.8 btg 156,917.31 155,348.14
91 Hollow 60 x 60 x 1.6 btg 314,300.25 311,157.25
92 Hollow 50 x 50 x 2.5 btg 220,962.60 218,752.97
93 Hollow 50 x 50 x 1.0 btg 117,338.76 116,165.37
94 Hollow 50 x 50 x 1.6 btg 205,723.80 203,666.56
95 Hollow 50 x 50 x 1.3 btg 156,959.64 155,390.04
96 Hollow 40 x 60 x 2.0 btg 217,914.84 215,735.69
97 Hollow 40 x 60 x 1.6 btg 198,104.40 196,123.36
98 Hollow 40 x 40 x 1.8 btg 167,626.80 165,950.53
99 Hollow 40 x 40 x 1.6 FL btg 234,444.71 232,100.26
100 Hollow 40 x 40 x 1.6 btg 164,579.04 162,933.25
101 Hollow 40 x 40 x 1.3 btg 124,958.16 123,708.58
102 Hollow 40 x 40 x 1.0 btg 102,099.96 101,078.96
103 Hollow 40 x 40 x 1.0 B btg 122,227.88 121,005.60
104 Hollow 40 x 40 x 0.8 / 4 m btg 174,029.21 172,288.92
105 Hollow 30 x 60 x 1.8 btg 198,104.40 196,123.36
106 Hollow 30 x 60 x 1.6 btg 182,865.60 181,036.94
107 Hollow 30 x 30 x 2.0 btg 131,053.68 129,743.14
108 Hollow 30 x 30 x 1.6 btg 121,910.40 120,691.30
109 Hollow 30 x 30 x 1.3 btg 92,956.68 92,027.11
110 Hollow 30 x 30 x 1.0 btg 68,574.60 67,888.85
111 Hollow 30 x 30 x 1.0 B btg 105,232.38 104,180.06
112 Hollow 30 x 30 x 1.0 C btg 116,058.28 114,897.69
113 Hollow 30 x 30 x 0.8 / 4 m btg 58,669.38 58,082.69
114 Hollow 20 x 40 x 1.8 btg 138,673.08 137,286.35
115 Hollow 20 x 40 x 1.8 B btg 140,211.07 138,808.96
116 Hollow 20 x 40 x 1.6 btg 122,672.34 121,445.62
117 Hollow 20 x 40 x 1.6 B btg 173,796.40 172,058.43
118 Hollow 20 x 40 x 1.3 btg 92,956.68 92,027.11
119 Hollow 20 x 40 x 1.3 B btg 165,827.78 164,169.50
120 Hollow 20 x 40 x 1.0 btg 89,908.92 89,009.83
121 Hollow 20 x 40 x 1.0 B btg 892,729.12 883,801.83
122 Hollow 20 x 40 x 0.8 / 4 m btg 60,955.20 60,345.65
123 Hollow 50 x 25 x 2.0 btg 175,246.20 173,493.74
124 Hollow 50 x 25 x 1.6 btg 146,292.48 144,829.56
125 Hollow 50 x 25 x 1.3 btg 115,814.88 114,656.73
126 Hollow 50 x 25 x 1.0 btg 85,337.28 84,483.91
127 Hollow 50 x 25 x 0.8 / 4 m btg 113,264.50 112,131.85
128 Hollow 20 x 20 x 2.0 btg 89,146.98 88,255.51
129 Hollow 20 x 20 x 1.6 btg 77,717.88 76,940.70
130 Hollow 20 x 20 x 1.3 btg 62,479.08 61,854.29
131 Hollow 20 x 20 x 1.0 btg 44,192.52 43,750.59
132 Hollow 20 x 20 x 0.8 / 4 m btg 32,904.52 32,575.47
133 Besi Siku L 30 x 30 x 3 kg 53,179.20 52,647.41
134 Scuare Tube m 26,700.39 26,433.39
135 Pintu Folding Door m2 476,385.92 471,622.06
136 Pengelasan teralis jendela,pintu,roster,void ukuran (100 x 50) cm cm 166,185.00 164,523.15
137 Pengelasan pagar m2 387,765.00 383,887.35
138 Pengelasan kanopi m2 315,751.50 312,593.99
139 Pintu aluminium natural m2 234,653.22 232,306.69
140 Pintu aluminium swing + kaca polos 5 mm m 1,000,000.00 990,000.00
141 Pintu Frameless (tempered 12 mm polos) floor hinge dorma BTS 84 m 3,000,000.00 2,970,000.00
142 Pintu fitting (tempered 12 mm polos) floor hinge dorma BTS 84 m 3,750,000.00 3,712,500.00
143 powder coating aluminium berbagai warna m' 20,000.00 19,800.00
144 tirai (Venetion blind and vertical blind) m2 537,300.00 531,927.00
145 folding gate 0.5 mm m2 443,160.00 438,728.40
146 Baja Strip 0,2 X 2 cm btg 24,813.42 24,565.29
147 Besi Strip Kaca kg 56,181.61 55,619.79
I. BAHAN KACA 0
1 Kaca Polos 2 mm (ASAHI) m2 107,706.33 106,629.27
2 Kaca Polos 3 mm (ASAHI) m2 124538.67 123,293.28
3 Kaca Polos 5 mm (ASAHI) m2 137565.73 136,190.07
4 Kaca Polos 8 mm (ASAHI) m2 207,417.00 205,342.83
5 Kaca Polos Sanblas 5 mm m2 317,475.00 314,300.25
6 Kaca Biasa 6 mm m2 294,743.79 291,796.35
7 Kaca Reyband 5 mm (ASAHI) m2 169,320.00 167,626.80
8 Kaca Reyband 6 mm m2 310,420.00 307,315.80
9 Kaca Reyband 8 mm (ASAHI) m2 423,300.00 419,067.00
10 Kaca Reyband 12 mm (ASAHI) m2 846,600.00 838,134.00
11 Kaca Es / Susu 3 mm m2 137,882.92 136,504.09
12 Kaca Es / Susu 5 mm m2 229,804.00 227,505.96
13 Kaca Cermin 5 mm m2 285,727.50 282,870.23
14 Kaca Cermin 6 mm m2 277,049.85 274,279.35
15 Kaca Cermin 8 mm m2 333,329.00 329,995.71
16 Kaca Patri Lokal Terpasang (ASAHI) m2 2,058,973.53 2,038,383.79
17 Kaca Patri ex Luar Negeri Terpasang m2 5,284,195.00 5,231,353.05
18 Kaca 6 mm Gravver m2 1,844,177.00 1,825,735.23
19 Kaca Lukis Terpasang m2 138,439.59 137,055.19
20 Glass Block DN 20 x 20 (Kedawung) buah 32,453.00 32,128.47
21 Glass Block DN 20 x 20 ex LN buah 125,579.00 124,323.21
22 Sealant kg 197,540.00 195,564.60
23 Jendela Nako buah 49,385.00 48,891.15

J. BAHAN PAKU DAN MUR BAUT


1 Paku 1 cm s/d 3 cm kg 24,230.33 23,988.03
2 Paku 4 cm s/d 7 cm kg 18,758.96 18,571.37
3 Paku 8 cm s/d 15 cm kg 18,758.96 18,571.37
4 Paku Beton 2 cm s/d 5 cm buah 3,517.31 3,482.14
5 Paku Kait Lengkap buah 2,344.87 2,321.42
6 Paku Cacing kg 87,541.83 86,666.41
7 Besi Beugeul Kuda-kuda kg 25,011.95 24,761.83
8 Duk Angker buah 28,138.44 27,857.06
9 Angker Mur Baut dia. 19 / Panjang 60 cm buah 9,379.48 9,285.69
10 Mur Baut HTB dia. 19 s/d 16 (5 cm) buah 11,724.35 11,607.11
11 Mur Baut Biasa dia. 19 s/d 16 (5 cm) buah 7,816.23 7,738.07
12 Piser dia. 12 s/d 20 cm buah 15,632.47 15,476.15
13 Paku Sekrup 3" buah 1,172.44 1,160.72
14 Ramset / Dinabolt buah 4,689.74 4,642.84
15 Baut Besar buah 12,505.98 12,380.92
16 Baut Kecil buah 1,563.25 1,547.62
17 Paku GRC kg 40,644.42 40,237.98
18 Paku Gypsum kg 39,081.17 38,690.36
19 Sekrup Fixer buah 1,563.25 1,547.62
20 Paku Skrup 5 cm kg 14,402.70 14,258.67
21 Paku Seng kg 19,942.20 19,742.78
22 Cotton Plaster buah 74,949.44 74,199.95
23 Cornice Coumpound zak 101,151.27 100,139.76
24 Paku Hak Panjang 15 cm kg 14,735.07 14,587.72
K. BAHAN PERPIPAAN 0
1 Besi Pipa untuk Hydrant BSP 1" btg 224,349.00 222,105.51
2 Besi Pipa untuk Hydrant BSP 1.15" btg 256,802.00 254,233.98
3 Besi Pipa untuk Hydrant BSP 1.5" btg 304,776.00 301,728.24
4 Besi Pipa untuk Hydrant BSP 2" btg 410,601.00 406,494.99
5 Besi Pipa untuk Hydrant BSP 2.5" btg 701,972.50 694,952.78
6 Besi Pipa untuk Hydrant BSP 3" btg 809,208.50 801,116.42
7 Besi Pipa untuk Hydrant BSP 4" btg 1,077,298.50 1,066,525.52
8 Besi Pipa untuk Hydrant BSP 6" btg 2,225,147.00 2,202,895.53
9 Besi Pipa Hitam 1" t = 2 mm btg 138,905.90 137,516.84
10 Besi Pipa Hitam 2" t = 2 mm btg 270,206.50 267,504.44
11 Besi Pipa Hitam 3" t = 2 mm btg 465,747.58 461,090.11
12 Besi Pipa Hitam 4" t = 2 mm btg 565,928.58 560,269.30
13 Besi Pipa Hitam 6" t = 2 mm btg 1,030,030.00 1,019,729.70
14 Pipa GIP Medium A 1/2" (6 m') btg 211,650.00 209,533.50
15 Pipa GIP Medium A 3/4" (6 m') btg 268,090.00 265,409.10
16 Pipa GIP Medium A 1" (6 m') btg 306,892.50 303,823.58
17 Pipa GIP Medium A 1 1/4" (6 m') btg 380,970.00 377,160.30
18 Pipa GIP Medium A 1 1/2" (6 m') btg 359,805.00 356,206.95
19 Pipa GIP Medium A 1 3/4" (6 m') btg 486,795.00 481,927.05
20 Pipa GIP Medium A 2" (6 m') btg 684,335.00 677,491.65
21 Pipa GIP Medium A 2 1/2" (6 m') btg 846,600.00 838,134.00
22 Pipa GIP Medium A 4" (6 m') btg 1,502,715.00 1,487,687.85
23 Pipa GIP Medium A 3" (6 m') btg 1,171,130.00 1,159,418.70
24 Macam-macam Sambungan GIP 1/2" buah 9,524.25 9,429.01
25 Macam-macam Sambungan GIP 3/4" buah 11,993.50 11,873.57
26 Macam-macam Sambungan GIP 1" buah 17,284.75 17,111.90
27 Macam-macam Sambungan GIP 1 1/4" buah 23,281.50 23,048.69
28 Macam-macam Sambungan GIP1 1/2" buah 27,161.75 26,890.13
29 Macam-macam Sambungan GIP 1 3/4" buah 31,042.00 30,731.58
30 Macam-macam Sambungan GIP 2" buah 56,440.00 55,875.60
31 Macam-macam Sambungan GIP 2 1/2" buah 67,022.50 66,352.28
32 Macam-macam Sambungan GIP 3" buah 106,370.35 105,306.65
33 Macam-macam Sambungan GIP 4" buah 140,538.77 139,133.39
34 Pipa PVC RUCIKA type AW 1/2" btg 42,330.00 41,906.70
35 Pipa PVC RUCIKA type AW 3/4" btg 59,967.50 59,367.83
36 Pipa PVC RUCIKA type AW 1" btg 57,851.00 57,272.49
37 Pipa PVC RUCIKA type AW 1 1/4" btg 81,838.00 81,019.62
38 Pipa PVC RUCIKA type AW 1 1/2" btg 97,711.75 96,734.63
39 Pipa PVC RUCIKA type AW 2" btg 128,401.00 127,116.99
40 Pipa PVC RUCIKA type AW 2 1/2" btg 156,973.75 155,404.01
41 Pipa PVC RUCIKA type AW 3" btg 240,222.75 237,820.52
42 Pipa PVC RUCIKA type AW 4" btg 385,908.50 382,049.42
43 Pipa PVC RUCIKA type AW 6" btg 1,008,865.00 998,776.35
44 Pipa PVC RUCIKA type AW 8" btg 1,242,385.50 1,229,961.65
45 Pipa PVC MASPION ABU type AW 1/2" btg 37,391.50 37,017.59
46 Pipa PVC MASPION ABU type AW 3/4" btg 159,301.90 157,708.88
47 Pipa PVC MASPION ABU type AW 1" btg 122,895.28 121,666.33
48 Pipa PVC MASPION ABU type AW 1 1/4" btg 45,152.00 44,700.48
49 Pipa PVC MASPION ABU type AW 1 1/2" btg 48,679.50 48,192.71
50 Pipa PVC MASPION ABU type AW 2" btg 69,844.50 69,146.06
51 Pipa PVC MASPION ABU type AW 2 1/2" btg 158,737.50 157,150.13
52 Pipa PVC MASPION ABU type AW 3" btg 218,705.00 216,517.95
53 Pipa PVC MASPION ABU type AW 4" btg 331,585.00 328,269.15
54 Macam-macam Sambungan Paralon 1/2" buah 4,938.50 4,889.12
55 Macam-macam Sambungan Paralon 3/4" buah 6,702.25 6,635.23
56 Macam-macam Sambungan Paralon 1" buah 7,407.75 7,333.67
57 Macam-macam Sambungan Paralon 1 1/4" buah 9,877.00 9,778.23
58 Macam-macam Sambungan Paralon 1 1/2" buah 13,404.50 13,270.46
59 Macam-macam Sambungan Paralon 1 3/4" buah 13,404.50 13,270.46
60 Macam-macam Sambungan Paralon 2" buah 21,870.50 21,651.80
61 Macam-macam Sambungan Paralon 2 1/2" buah 32,453.00 32,128.47
62 Macam-macam Sambungan Paralon 3" buah 40,919.00 40,509.81
63 Macam-macam Sambungan Paralon 4" buah 60,673.00 60,066.27
64 Sambungan Pipa PVC Jenis AW 4" TY buah 123,462.50 122,227.88
65 Lem Paralon tube 14,110.00 13,968.90
66 Solatif Ledeng gl 5,644.00 5,587.56
67 Pipa PVC 4" Berlobang Jenis AW m' 80,779.75 79,971.95
68 PVC Waterstop Lebar 150 m' 70,077.32 69,376.54
69 PVC Waterstop Lebar 200 m' 69,316.79 68,623.62
70 PVC Waterstop Lebar 230 m' 80,290.13 79,487.23
71 PVC Waterstop Lebar 250 m' 90,285.66 89,382.80
72 PVC Waterstop Lebar 300 m' 101,910.89 100,891.78
73 PVC Waterstop Lebar 320 m' 109,624.82 108,528.57
74 Strorox - 100 kg 38,500.00 38,115.00
75 Pipa Tanah buah 10,850.00 10,741.50
76 Pipa Beton buah 49,000.00 48,510.00
L. BAHAN SANITAIR 0
1 Stop Kran 3/4" KIT buah 112,880.00 111,751.20
2 Stop Kran 1" KIT buah 159,443.00 157,848.57
3 Stop Kran 1 1/2" KIT buah 318,886.00 315,697.14
4 Stop Kran 2" KIT buah 486,089.50 481,228.61
5 Stop Kran 2 1/2" KIT buah 1,223,337.00 1,211,103.63
6 Stop Kran 3" KIT buah 1,579,614.50 1,563,818.36
7 Check Valve 1/2" buah 94,537.00 93,591.63
8 Double Neple 1/2" buah 57,145.50 56,574.05
9 Water Mur 1/2" buah 50,090.50 49,589.60
10 Gate Walve 1/2" buah 74,077.50 73,336.73
11 Saringan Air Lt. KM Stainless Steel buah 78,553.16 77,767.63
12 Apooer Bath Tube buah 232,815.00 230,486.85
13 Kran Stainless Lokal Kait buah 62,529.88 61,904.58
14 Shower dengan Tiang buah 226,465.50 224,200.85
15 Shower Tanpa Tiang buah 123,462.50 122,227.88
Jet shower buah 245,000.00 264,600.00
16 Kran Tembok Sun Eui dia. 1/2" buah 82,543.50 81,718.07
17 Kran Tembok ITAP dia. 1/2" buah 45,857.50 45,398.93
18 Kran Bebek Sun Eui 1/2" buah 144,274.75 142,832.00
19 Kran Bebek ITAP 1/2" buah 75,841.25 75,082.84
20 Kran Panas Dingin Sun Eui Standard buah 330,174.00 326,872.26
21 Bath Cape Washteren unit 3,342,659.00 3,309,232.41
22 Tempat Sabun Poslin buah 76,899.50 76,130.51
23 Wastafel Lengkap TOTO LW 230 unit 1,472,578.58 1,457,852.79
24 Wastafel Lengkap INA unit 891,050.73 882,140.22
25 Closet Jongkok Poslin Warna TOTO unit 355,638.67 352,082.28
26 Closet Jongkok Standard Putih Poslin TOTO unit 283,611.00 280,774.89
27 Closet Jongkok Lengkap Sistem Jet TOTO unit 2,803,657.00 2,775,620.43
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 2,522,868.00 2,497,639.32
29 Closet Jongkok KIA buah 187,365.77 185,492.11
30 Closet Jongkok INA (Wanan gelap) buah 300,925.03 297,915.78
31 Closet Duduk KIA unit 946,874.28 937,405.54
32 Closet Dudduk Ina (Warna Gelap) buah 1,875,364.78 1,856,611.13
33 Wastafel Bulat Warna Standard Lengkap unit 1,434,987.00 1,420,637.13
34 Wastafel Type Amerika Standard buah 115,560.90 114,405.29
35 Wastafel Meja buah 795,228.66 787,276.37
36 Closet Duduk Warna Standar INA Lengkap buah 2,095,532.47 2,074,577.15
37 Urinoir Lengkap TOTO Warna Standard unit 3,031,135.74 3,000,824.38
38 Penyekat Poslin Urinoir TOTO lbr 937,948.14 928,568.66
39 Kitchen Zink Stainless Standard Lokal ( 1 Lubang) buah 604,976.55 598,926.78
40 Kitchen Zink Stainless Non Standard Franke( 1 Lubang) buah 1,413,116.50 1,398,985.34
41 Kitchen Zink Stainless Non Standard Franke( 1 Lubang) buah 1,596,546.50 1,580,581.04
42 Talang PVC U-15 cm btg 70,346.11 69,642.65
43 Water Drain + Acsesoris set 1,250,526.97 1,238,021.70
44 Clean Out buah 885,374.28 876,520.54
45 Septictank Biofil (Type BF-03, BF-06-08, dst) unit 7,478,325.00 7,403,541.75
46 Septictank Ipal Biofil (Type R-05, R-10, dst) unit 15,067,440.00 14,916,765.60
M. BAHAN PENUTUP ATAP 0
1 Atap Plastik Gelombang 80 x 180 lbr 84,448.35 83,603.87
2 Atap Fiber Glass Tipis 80 x 180 (Gelombang) lbr 84,660.00 83,813.40
3 Atap Fiber Glass Tebal 80 x 180 (Gelombang) lbr 82,543.50 81,718.07
4 Atap Aluminium Natura USR 26 (JAINDO) m2 149,566.00 148,070.34
5 Atap Aluminium Warna USR 26 (JAINDO) m2 251,158.00 248,646.42
6 Atap Asbes Gel. Kecil 80 x 180 x 4 mm lbr 91,715.00 90,797.85
7 Atap Asbes Gel. Besar 80 x 180 x 4 mm lbr 101,611.05 100,594.94
8 Atap Seng Gelombang 80 cm x 180 cm x 3 mm lbr 70,550.00 69,844.50
9 Atap Seng Gelombang 80 cm x 180 cm x 5 mm lbr 91,009.50 90,099.41
10 Atap Seng Gelombang 270 cm x 106 cm x 4 mm lbr 110,763.50 109,655.87
11 Atap Seng Gelombang 240 cm x 105 cm x 4 mm lbr 98,064.50 97,083.86
12 Atap Seng Gelombang 210 cm x 105 cm x 4 mm lbr 87,482.00 86,607.18
13 Atap Seng Gelombang 150 cm x 105 cm x 4 mm lbr 63,495.00 62,860.05
14 Atap Seng Gelombang 150 cm x 102 cm x 5 mm lbr 63,495.00 62,860.05
15 Atap Seng Gelombang 180 cm x 102 cm x 5 mm lbr 128,203.46 126,921.43
16 Atap Seng Gelombang 300 cm x 105 cm x 4 mm lbr 123,462.50 122,227.88
17 Atap Tegola Kubota, lengkap m2 759,118.00 751,526.82
18 Atap Tegola Kubota Kwalitas sedang m2 420,478.00 416,273.22
19 Aluminium Foil m2 27,161.75 26,890.13
20 Atap Genteng Plentong Pres Bakar KW 1 buah 2,931.09 2,901.78
21 Atap Genteng Plentong Pres Molen Oven KW 2 buah 2,645.63 2,619.17
22 Atap Genteng Flam pres Molen Oven Jatiwangi buah 2,645.63 2,619.17
23 Bubung Genteng pres Bulat ex Jatiwangi buah 7,055.00 6,984.45
24 Genteng Bubungan ex Jatiwangi Segitiga buah 4,233.00 4,190.67
25 Genteng Bubungan Beton buah 14,124.11 13,982.87
26 Genteng Metal Berpasir (warna) m2 90,668.32 89,761.64
27 Genteng Metal Hana m2 228,375.99 226,092.23
28 Nok Atas Metal Berpasir (Warna) lbr 150,071.70 148,570.98
29 Nok Atas Metal Hana lbr 253,017.76 250,487.58
30 Nok Pinggir Metal (Rainbow Roof) lbr 150,071.70 148,570.98
31 Nok Pinggir Metal Hana lbr 110,208.91 109,106.82
32 Wall Flasing (Rainbow Roof) lbr 150,977.00 149,467.23
33 Wall Flasing Hana lbr 117,113.00 115,941.87
34 Atap Genteng Beton Warna 14.5/m2 m2 130,517.50 129,212.33
35 Genteng Beton Natural m2 91,715.00 90,797.85
36 Sirap Kelas 1 buah 155,210.00 153,657.90
37 Genteng Keramik Natural Intan 14.5/m2 m2 130,500.00 129,195.00
38 Genteng Keramik Glasur Standard 14.5/m2 m2 137,750.00 136,372.50
39 Genteng Keramik Glasur Spesial 14.5/m2 m2 100,886.50 99,877.64
40 Genteng Keramik Glasur Premium 14.5/m2 m2 112,174.50 111,052.76
41 Genteng Murando Natural 1 m2 = 18 buah buah 9,372.83 9,279.10
42 Genteng Murando Glasur 1 m2 = 18 buah buah 10,934.97 10,825.62
43 Bubung Murando Natural buah 10,161.10 10,059.49
44 Bubung Murando Glasur buah 12,896.79 12,767.82
45 Bubungan Genteng Keramik buah 24,692.50 24,445.58
46 Atap Genteng Kodok buah 3,574.53 3,538.79
47 Bubungan Genteng Kodok buah 7,055.00 6,984.45
48 Bubungan Genteng Plentong buah 7,816.23 7,738.07
49 Bubungan Stel Gelombang buah 13,363.58 13,229.95
50 Nok Genteng Metal lbr 75,770.70 75,012.99
51 Nok Atap Seng lbr 50,846.80 50,338.33
52 Nok Standar 40 cm 18, SWG 22 m2 74,423.20 73,678.96
53 Pelat Asbes tebal 4 mm lbr 21,165.00 20,953.35
54 Pelat Asbes tebal 3.5 mm lbr 30,964.40 30,654.75
55 Trusses ZAM-75 t = 0.8 Rangka Utama m' 40,685.06 40,278.21
56 Trusses ZAM-75 t = 0.8 Rangka Utama m' 41,166.54 40,754.87
57 Reng 16-DB Roof Battens t = 0.48 mm m' 53,150.39 52,618.89
58 Foot Plate t = 1.22 mm m' 14,444.40 14,299.96
59 PLD - Diafragma Plate buah 6,981.46 6,911.65
60 Wind Bracing m' 3,370.36 3,336.66
61 Tensioner (Pengaku Tali Angin) buah 10,351.82 10,248.30
62 Acrilic m2 1,410,517.68 1,396,412.50
63 Policarbonate m2 1,410,517.68 1,396,412.50
64 Atap Zingkalum m2 120,370.01 119,166.31
65 Atap Spandek m2 134,573.67 133,227.93
66 Atap Superdek m2 160,573.60 158,967.86
67 Atap Bondek m2 176,462.44 174,697.82
68 Bubungan Atap Zingkalum m' 111,462.63 110,348.00
69 Bubungan Atap Spandek m' 276,489.92 273,725.02
70 Bubungan Atap Superdek m' 130,360.72 129,057.11
71 Bubungan Atap Bondek m' 66,684.99 66,018.14
72 Genteng Keramik setara KIA (S-1 Standard Unglassed) buah 10,000.00 9,900.00
73 Genteng Keramik setara KIA (S-1 Standard Natural) buah 10,000.00 9,900.00
74 Genteng Keramik setara KIA (S-1 Standard Standard) buah 11,299.29 11,186.30
75 Genteng Keramik setara KIA (S-1 Standard Spesial) buah 14,124.11 13,982.87
76 Genteng Keramik setara KIA (S-1 Standard Premium) buah 19,339.17 19,145.77
77 Genteng Keramik setara KIA (S-1 Standard Exlusive) buah 21,077.52 20,866.74
78 Genteng Keramik setara KIA (S-2 Nok Unglassed) buah 21,620.75 21,404.55
79 Genteng Keramik setara KIA (S-2 Nok Natural) buah 22,163.99 21,942.35
80 Genteng Keramik setara KIA (S-2 Nok Standard) buah 26,075.28 25,814.53
81 Genteng Keramik setara KIA (S-2 Nok Spesial) buah 28,791.46 28,503.54
82 Genteng Keramik setara KIA (S-2 Nok Premium) buah 31,398.98 31,084.99
83 Genteng Keramik setara KIA (S-2 Nok Exlusive) buah 36,505.39 36,140.34
84 Genteng Keramik setara KIA (S-3 List Plang Kiri Unglassed) buah 31,181.69 30,869.87
85 Genteng Keramik setara KIA (S-3 List Plang Kiri Natural) buah 26,401.22 26,137.21
86 Genteng Keramik setara KIA (S-3 List Plang Kiri Standard) buah 27,053.10 26,782.57
87 Genteng Keramik setara KIA (S-3 List Plang Kiri Spesial) buah 28,030.93 27,750.62
88 Genteng Keramik setara KIA (S-3 List Plang Kiri Premium) buah 30,964.40 30,654.75
89 Genteng Keramik setara KIA (S-3 List Plang Kiri Exlusive) buah 35,527.57 35,172.29
90 Genteng Keramik Setara. M-Class (M-1 Standard Natural) bh 27,922.28 27,643.06
91 Genteng Keramik Setara M-Class (M-1 Standard Standard) bh 10,104.17 10,003.13
92 Genteng Keramik Setara M-Class (M-1 Standard Special) bh 12,820.35 12,692.14
93 Genteng Keramik Setara M-Class (M-1 Standard Premium) bh 16,405.70 16,241.64
94 Genteng Keramik Setara M-Class (M-2 NOK Natural) bh 23,141.81 22,910.39
95 Genteng Keramik Setara M-Class (M-2 NOK Standard) bh 25,966.63 25,706.97
96 Genteng Keramik Setara M-Class (M-2 NOK Special) bh 29,443.34 29,148.90
97 Genteng Keramik Setara M-Class (M-2 NOK Premium) bh 34,875.69 34,526.93
98 Genteng Keraxnik Setara M-Class (M-3 List Plang Kiri Natural) bh 30,529.81 30,224.51
99 Genteng Keramik Setara. M-Class (M-3 List Plang Kiri Standard) bh 21,403.46 21,189.42
100 Genteng Keramik Setara M-Class (M-3 List Plang Kiri Special) bh 23,902.34 23,663.32
101 Genteng Keramik Setara M-Class (M-3 List Plang Kiri Premium) bh 27,704.99 27,427.94
102 Genteng Beton Garuda Natural (9.5 Bh/m2) bh 24,336.93 24,093.56
103 Genteng Beton Garuda Cat Minyak (9.5 Bh/m2) bh 48,891.15 48,402.24
104 Genteng Beton Garuda Cat Air (9.5 Bh/m2) bh 37,157.27 36,785.70
105 Genteng Beton Flat Natural (10 Bh/m2) bh 32,702.75 32,375.72
106 Genteng Beton Flat Cat Minyak (10 Bh/m2) bh 22,163.99 21,942.35
107 Genteng Beton Flat Cat Air (10 Bh/m2) bh 18,144.05 17,962.61
108 Genteng Beton Nok Bulat Besar (NBB, P-D 91 cm -19 cm) bh 73,336.73 72,603.36
109 Genteng Beton Nok Atas Besar (NAB, P-L-T 91 cm - 8 cm - 10 cm) bh 179,376.20 177,582.44
110 Genteng Keramik Setara SAHARA (S-1 Standard Unglazed) bh 62,472.03 61,847.30
111 Genteng Keramik Setara SAHARA (S-1 Standard Natural) bh 11,299.29 11,186.30
112 Genteng Keramik Setara SAHARA (S-1 Standard Standard) bh 12,928.99 12,799.70
113 Genteng Keramik Setara SAHARA (S-1 Standard Khusus) bh 16,731.64 16,564.32
114 Genteng Keramik Setara SAHARA (S-1 Standard Premium) bh 21,403.46 21,189.42
115 Genteng Keramik Setara SAHARA (S-2 NOK Unglazed) bh 24,988.81 24,738.92
116 Genteng Keramik Setara SAHARA (S-2 NOK Natural) bh 26,401.22 26,137.21
117 Genteng Keramik Setara SAHARA (S-2 NOK Standard) bh 32,702.75 32,375.72
118 Genteng Keramik Setara SAHARA (S-2 NOK Khusus) bh 38,786.98 38,399.11
119 Genteng Keramik Setara SAHARA (S-3 List Plang Kiri Unglazed) bh 33,897.86 33,558.89
120 Genteng Keramik Setara SAHARA (S-3 List Plang Kiri Natural) bh 21,946.69 21,727.23
121 Genteng Keramik Setara SAHARA (S-3 List Plang Kiri Standard) bh 31,507.63 31,192.55
122 Genteng Kerarnik Setara SAHARA (S-3 List Plang Kiri Khusus) bh 36,396.75 36,032.78
123 Genteng Keramik Setara SAHARA (S-3 List Plang Kiri Premium) bh 39,004.27 38,614.23
Genteng Keramik Setara GRAND (Type Elabana, P=420 mm, L=335 mm, Isi=9/m2,
124 bh 59,755.85 59,158.29
Berat=4.20 Kg)
Genteng Keramik Setara GRAND (Type Garuda Besar, P=420 mm, L=335 mm,
125 bh 36,939.98 36,570.58
Isi=9/m2, Berat=4.20 Kg)
Genteng Keramik Setara GRAND (Type Centurion, P=420 mm, L=335 mm, Isi=9/m2,
126 bh 8,365.82 8,282.16
Berat=4.20 Kg)
Genteng Keramik Setara GRAND (Type Royal, P=368 mm, L=300 mm, Isi=13/m2,
127 bh 6,627.47 6,561.19
Berat = 3.20 Kg)
Genteng Keramik Setara GRAND (Type Garuda Kecil, P=392 mm, L=292 mm,
128 bh 5,541.00 5,485.59
Isi=9/m2, Berat=3.20 Kg)
129 Nok Bulat Standard (NBS, P-D 37.5 cm - 12 cm) bh 90,177.01 89,275.24
130 Nok Atas Standard (NAS, P-L-T 91 cm - 5 cm - 6.5 cm) bh 83,440.90 82,606.49
131 Nok Pinggir (NPG, P-L-T 91.4 cm - 10 cm - 7 cm) bh 60,190.44 59,588.53
132 Asbes Motif Genteng lbr 95,609.36 94,653.27
133 Nok Stel Gelombang 1000 mm Ibr 68,121.67 67,440.45
134 Nok Stel Rata lbr 68,990.85 68,300.94
135 Nok Paten Gelombang lbr 59,103.97 58,512.93
136 Nok Paten Rata Ibr 37,591.86 37,215.94
137 Hipcapping Besar lbr 450,885.05 446,376.20
138 Ujung Nok lbr 637,214.66 630,842.51
139 Shednok Natural 6 lbr 58,017.50 57,437.32
140 Penutup Atas lbr 129,289.93 127,997.03
141 Penutup Bawah Type B lbr 128,746.70 127,459.23
142 Penutup Bawah Type C lbr 123,857.58 122,619.00
143 Lisplang Simetris lbr 923,499.50 914,264.51
144 Lisplang Siku-siku lbr 2,645,554.45 2,619,098.91
145 Lisplang Kalsiplang (3000 x 200 x 8.0 mm) lbr 55,807.91 55,249.83
146 Lisplang Kalsiplang (2400 x 200 x 8.0 mm) lbr 44,318.05 43,874.87
147 Lisplang Kalsiplang (3000 x 200 x 12.0 mm) lbr 75,559.05 74,803.46
148 Lisplang Kalsiplang (2400 x 200 x 12.0 mm) lbr 60,743.55 60,136.11
149 Lisplang Kalsiplang (3000 x 300 x 8.0 mm) lbr 75,559.05 74,803.46
150 Lisplang Kalsiplang (2400 x 300 x 8.0 mm) lbr 60,002.78 59,402.75
151 Lisplang Kalsiplang (3000 x 300 x 12.0 mm) lbr 113,338.58 112,205.19
152 Lisplang Kalsiplang (2400 x 300 x 12.0 mm) lbr 91,856.10 90,937.54
153 Papan Gypsum 120 x 240 (t = 12 mm Ex. DN) lbr 86,994.69 86,124.74
154 Papan Gypsum 120 x 240 (t = 12 mm Ex. LN) lbr 88,636.10 87,749.74
155 List Plafond Gypsum Polos Siku (Set Jaya Board Panjang 2 m) Btg 60,872.83 60,264.10
156 List Plafond Gypsum Polos Siku (Set Jaya Board Panjang 5 m) Btg 29,567.51 29,271.83
157 List Plafond Gypsum Polos Siku (Set Jaya Board Panjang 10 m) Btg 32,012.06 31,691.94
158 List Plafond Gypsum Polos Siku (Set Jaya Board Panjang 15 m) Btg 32,244.88 31,922.43
159 List Plafond Gypsum Polos (Set Jaya Board Panjang 2 m) Big 16,297.05 16,134.08
160 List Plafond Gypsum Polos (Set Jaya Board Panjang 5 m) Btg 17,778.60 17,600.81
161 List Plafond Gypsum Polos (Set Jaya Board Panjang 10 m) Btg 20,741.70 20,534.28
162 List Plafond Gypsum Polos (Set Jaya Board Panjang 15 m) Btg 26,667.90 26,401.22
163 List Plafond Gypsum Ombak (Set Jaya Board Panjang 2 m) Btg 217,837.24 215,658.86
164 List Plafond Gypsum Ombak (Set Jaya Board Panjang 5 m) Btg 96,369.89 95,406.19
165 List Plafond Gypsum Ombak (Set Jaya Board Panjang 10 m) Btg 97,130.42 96,159.11
166 List Plafond Gypsum Ombak (Set Jaya Board Pandang 15 m) Btg 103,323.30 102,290.06
167 Genteng Plentong buah 1,717.25 1,700.08
168 Jabesmen gelombang 150x105 mm buah 40,000.00 39,600.00
169 Jabesmen gelombang 180x105 mm buah 46,000.00 45,540.00
170 Jabesmen gelombang 210x105 mm buah 52,000.00 51,480.00
171 Jabesmen gelombang 240x105 mm buah 60,000.00 59,400.00
172 Jabesmen gelombang 270x105 mm buah 68,000.00 67,320.00
173 Jabesmen gelombang 300x105 mm buah 76,000.00 75,240.00
-
N. BAHAN MEKANIKAL 0
1 Jockey Pump kap. 80 gln/menit 100 ml (18.6 kW) unit 84,287,552.44 83,444,676.92
2 Electrical Pump kap. 750 gln/menit 120 ml (90 kW) unit 353,531,037.89 349,995,727.51
3 Diesel Pump kap. 750 gln/menit 120 ml (105 kW) unit 883,828,303.74 874,990,020.70
4 Presure Tank kap. 500 liter lengkap unit 51,681,014.48 51,164,204.33
5 Hydran Box dlm Gedung ( Lengkap ) unit 9,163,471.41 9,071,836.70
6 Fire House 1.5 x 30 m + nose unit 7,371,049.89 7,297,339.39
7 Exhose Fan H 360 W 60 x 60 cm unit 7,610,701.19 7,534,594.17
8 Exhose Fan H 380 W CFM 55 x 55 cm unit 8,579,232.75 8,493,440.42
9 Exhose Fan H 100 W 40 x 40 cm unit 1,351,406.42 1,337,892.35
10 AC Split 3 PK Setara TOSHIBA unit 30,941,028.84 30,631,618.55
11 AC Split 2 PK Setara TOSHIBA unit 17,898,535.00 17,719,549.65
12 AC Split 1 PK Setara TOSHIBA unit 4,642,190.00 4,595,768.10
13 Mesin AC Split DAIKIN (Indoor / Outdoor Unit) 1 BTU 19,559,620.64 19,364,024.43
-
O. BAHAN ELEKTRIKAL 0
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) ROLL 158,361.23 156,777.62
2 Kabel NYA 1 x 2.5 Prima ( 1 ml = 50 m' ) ROLL 241,995.91 239,575.95
3 Kabel NYM 2 x 1.5 Prima ( 1 ml = 50 m' ) m' 7,574.72 7,498.97
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) m' 9,563.76 9,468.12
5 Kabel NYM 2 x 2.5 Prima ( 1 ml = 50 m' ) m' 12,552.73 12,427.20
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) m' 15,488.55 15,333.66
7 Kabel NYM 4 x 2.5 Prima ( 1 ml = 50 m' ) m' 8,978.19 8,888.41
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m' 7,553.08 7,477.55
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m' 18,832.15 18,643.83
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m' 25,413.99 25,159.85
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m' 13,538.55 13,403.16
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m' 17,813.88 17,635.74
13 Kabel NYM 4 x 6 Supreme ( 1 ml = 50 m' ) m' 29,317.76 29,024.58
14 Kabel NYM 2 x 10 Supreme (1 rol = 50 m') m' 22,374.23 22,150.48
15 Kabel NYM 3 x 10 Supreme (1 rol = 50 m') m' 29,642.29 29,345.87
16 Kabel NYM 4 x 10 Supreme (1 rol = 50 m') m' 32,635.02 32,308.67
17 Kabel NYM 4 x 16 Supreme (1 rol = 50 m') m' 44,605.94 44,159.88
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m' 13,538.55 13,403.16
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m' 20,624.12 20,417.88
20 Kabel NYY 4 x 4 Supreme ( 1 ml = 50 m' ) m' 30,438.09 30,133.71
21 Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' ) m' 13,396.03 13,262.07
22 Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' ) m' 26,580.42 26,314.61
23 Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' ) m' 27,647.13 27,370.66
24 Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m') m' 23,799.34 23,561.34
25 Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m') m' 32,492.51 32,167.58
26 Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m') m' 50,119.66 49,618.46
27 Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m') m' 63,559.91 62,924.31
28 NSFB FUJI EA - 100 A bh 1,254,096.80 1,241,555.83
29 NSFB FUJI EA - 150 A bh 2,565,198.00 2,539,546.02
30 Rumah Panel 30 x 60 cm ( Kosong ) unt 213,766.50 211,628.84
31 Skring Kas 2 grop Biasa unt 267,337.47 264,664.09
32 Skring Kas 3 grop Biasa unt 327,380.22 324,106.42
33 Skring Kas 5 grop Biasa unt 672,134.55 665,413.21
34 MCB 1 PAS bh 78,943.97 78,154.53
35 MCB 3 PAS bh 96,311.64 95,348.52
36 Tahanan 50 A Merk Fuji bh 766,709.18 759,042.09
37 Saklar Broko Tunggal Standard ( 1 Phase ) bh 29,524.52 29,229.27
38 Saklar Broko Seri Standard ( 1 Phase ) bh 32,692.70 32,365.77
39 Stop Kontak Broko Standard ( 1 Phase ) bh 32,369.63 32,045.93
40 Stop Kontak Broko 3 Phase (Out Bow) bh 121,134.35 119,923.01
41 Stop Kontak Broko 3 Phase ( In Bow) bh 205,215.84 203,163.68
42 Stop Kontak Handle 3 Phase bh 119,709.24 118,512.15
43 Instalasi Titik Lampu / Stop Kontak (Upah dan Alat) ttk 284,198.29 281,356.31
44 Lampu pijar 25 Watt s/d 100 Watt bh 13,519.73 13,384.53
45 Lampu Neon Phillips 20 Watt bh 45,246.07 44,793.61
46 Lampu Neon Phillips 40 Watt bh 62,272.13 61,649.41
47 Trapo TL 20 W (Phillips) bh 67,692.73 67,015.80
48 Trapo TL 40 W (Phillips) bh 71,255.50 70,542.95
49 Trapo TL 20 W (Sinar) bh 35,627.75 35,271.47
50 Trapo TL 40 W (sinar) bh 42,753.30 42,325.77
51 Stater Neon Phillips bh 7,125.55 7,054.29
52 Stater Neon Biasa bh 4,987.89 4,938.01
53 Rumah TL In Bow / Out Bow 2 x 20 W (kosongan Sonora) bh 178,138.75 176,357.36
54 Down Light + SL 25 W bh 413,281.90 409,149.08
55 Lampu SL Philip 25 W bh 38,500.00 38,115.00
Lampu TL 40 W Lengkap 112,868.71
56 Lampu TL 20 W Lengkap bh 71,500.00 70,785.00
57 Lampu Mercuri 80 W bh 171,746.92 170,029.45
58 Lampu Taman + Tiang + Lampu 1 Buah bh 541,541.80 536,126.38
59 Lampu Baret 30 cm + Neon bh 315,775.87 312,618.11
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh 1,054,581.40 1,044,035.59
61 Jarum Penangkal Petir 16 bh 149,993.54 148,493.60
62 Kawat BC ( Tembaga ) kg 63,155.17 62,523.62
63 Pentanahan Penangkal Petir ttk 663,129.33 656,498.04
64 Pentanahan Panel ttk 256,519.80 253,954.60
65 Balk TL 1 x 18 W bh 1,061,372.54 1,050,758.82
66 Balk TL 1 x 36 W bh 1,116,999.81 1,105,829.81
67 TKO TL 1 x 18 W bh 43,360.03 42,926.43
68 TKO TL 2 x 18 W bh 58,866.92 58,278.25
69 TKO TL 1 x 36 W bh 91,698.07 90,781.09
70 TKO TL 2 x 36 W bh 115,491.76 114,336.84
71 Kabel NYGBY ml 155,147.92 153,596.44
Jenis Tarik 1000 A Tanpa Unit
72 Panel ACB 4 Pase ACB Ml0H1 4P bh 31,393,254.34 31,079,321.80
Trip MG
Jenis Tetap 1000 A Tanpa Unit
73 Panel ACB 4 Pase ACB Ml0H1 4P bh 31,238,580.52 30,926,194.71
Trip MG
Jenis Tetap 1250 A Tanpa Unit
74 Panel ACB 4 Pase ACB Ml0H1 4P bh 31,038,670.04 30,728,283.34
Trip MG
Jenis Tetap 1250 A Tanpa Unit
75 Panel ACB 4 Pase ACB Ml0H1 4P bh 32,030,419.61 31,710,115.41
Trip MG
Jenis Tetap 2500 A Tanpa Unit
76 Panel ACB 4 Pase ACB Ml0H1 4P bh 55,250,752.76 54,698,245.23
Trip MG
Jenis Tetap 2500 A Tanpa Unit
77 Panel ACB 4 Pase ACB Ml0H1 4P bh 56,244,971.58 55,682,521.86
Trip MG
Jenis Tetap 1000 A Tanpa Unit
78 Panel ACB 4 Pase ACB Ml0H1 4P bh 31,474,344.51 31,159,601.06
Trip MG
Jenis Tetap 3200 A Tanpa Unit
79 Panel ACB 4 Pase ACB Ml0H1 4P bh 60,870,271.91 60,261,569.19
Trip MG
125 - 160 A, 36 KA (NS160N)
80 Panel MCCB 3 Pase MCCB bh 4,392,795.75 4,348,867.79
MG
81 Panel MCCB 3 Pase MCCB 50 - 63 A, 25 KA (NS100N) MG bh 4,334,422.68 4,291,078.45
82 . Panel MCCB 3 Pase MCCB 40 - 50 A, 25 KA (NS100N) MG bh 1,088,149.09 1,077,267.60
83 Panel MCCB 3 Pase MCCB 32 - 50 A, 25 KA (NS100N) MG bh 790,160.00 782,258.40
84 Panel MCCB 3 Pase MCCB 32 - 50 A, 10 KA (NC45H) MG bh 6,026,254.01 5,965,991.47
85 Panel MCCB 3 Pase MCCB 20 - 10 A, 10 KA (NC45H) MG bh 3,970,060.15 3,930,359.55
160 - 200 A, 36 KA (NS250N)
86 Panel MCCB 3 Pase MCCB bh 3,997,616.98 3,957,640.81
MG
87 Panel MCCB 3 Pase MCCB 80 - 100 A, 26 KA (NS100) MG bh 2,477,250.37 2,452,477.87
88 Panel MCCB 3 Pase MCCB 20 - 25 A, KA (NS100) MG bh 397,549.25 393,573.76
89 Panel MCCB 3 Pase MCCB 13 - 16 A, KA (NS100) MG bh 405,036.02 400,985.66
90 Panel MCCB 3 Pase MCCB 16 A, 5 KA (NC45a) MG bh 344,628.28 341,182.00
91 Panel MCCB 3 Pase MCCB 10 A, 5 KA (NC45a) MG bh 319,313.53 316,120.40
92 Panel MCCB 3 Pase MCCB 6 A, 5 KA (NC45a) MG bh 159,602.44 158,006.42
93 Panel MCCB 3 Pase MCCB 25 A, 25 KA (NS100N) MG bh 87,608.99 86,732.90
94 Panel MCCB 3 Pase MCCB 16 A, 5 KA (NS100N) MG bh 3,761,260.37 3,723,647.77
95 Panel MCCB 3 Pase MCCB 32 A, 25 KA MG bh 3,801,558.53 3,763,542.94
96 Panel MCCB 3 Pase MCCB 80 - 100 A, 25 KA (NS100) MG bh 585,212.25 579,360.13
97 Panel MCCB 3 Pase MCCB 50 - 63 A,(NS100) MG bh 549,101.94 543,610.92
350 - 500 A / 70 KA / 3 Pole
98 Panel MCCB 3 Pase MCCB bh 583,651.68 577,815.17
NS630 bN/H/L
224 - 320 A / 70 KA / 3 Pole
99 Panel MCCB 3 Pase MCCB bh 560,944.46 555,335.02
NS400 bN/H/L
175 -.250 A / 70 KA / 3 Pole
100 Panel MCCB 3 Pase MCCB bh 564,964.40 559,314.76
NS250 bN/H/L
160 - 300 A / 70 KA / 3 Pole
101 Panel MCCB 3 Pase MCCB bh 569,201.63 563,509.62
NS400 bN/H/L
64 - 80 A / 70 KA / 3 Pole NS100
102 Panel MCCB 3 Pase MCCB bh 549,753.82 544,256.28
bN/H/L
44 - 63 A / 70 KA / 3 Pole NS100
103 Panel MCCB 3 Pase MCCB bh 639,170.30 632,778.60
bN/H/L
32 - 40 A / 70 KA / 3 Pole NS100
104 Panel MCCB 3 Pase MCCB bh 651,990.65 645,470.74
bN/H/L
105 Panel MCCB 3 Pase Contraktor 400 A / 3 Pole LCI - F3304 bh 1,648,718.23 1,632,231.04
106 Panel MCCB 3 Pase Contraktor 250 A / 3 Pole LCI - F1504 bh 2,485,082.83 2,460,232.00
107 Panel MCCB 3 Pase Contraktor 200 A / 3 Pole LCI - F1154 bh 560,025.90 554,425.64
108 Panel MCCB 3 Pase Contraktor 160 A / 3 Pole LCI - F1154 bh 571,048.63 565,338.15
109 Panel MCB 3 Pase MCB 16 A, 5 KA (NC45a) MG bh 401,993.90 397,973.96
110 Panel MCB 3 Pase MCB 10 A, 5 KA (NC45a) MG bh 396,452.90 392,488.37
111 Panel MCB 3 Pase MCB 6 A, 5 KA (NC45a) MG bh 260,329.50 257,726.21
112 Panel MCB 3 Pase MCB 10 A, 6 KA, 10 A, 6 K MG bh 260,329.50 257,726.21
113 Panel MCB 3 Pase MCB 50 A, 10 A (NC100H) MG bh 591,209.00 585,296.91
114 Panel MCB 3 Pase MCB 16 A, 6 KA (NC45aD) MG bh 260,329.50 257,726.21
115 Panel MCB 3 Pase MCB 6 A, 6 KA (NC45aD) MG bh 311,831.00 308,712.69
116 Panel MCB 3 Pase MCB 63 A, 10 KA (NC100H) MG bh 591,209.00 585,296.91
117 Panel MCB 3 Pase MCB 32 A, 10 KA (NC100H) MG bh 302,659.50 299,632.91
118 Panel MCB 3 Pase MCB 16 A, 8 KA (NC10014) MG bh 301,650.64 298,634.13
119 Panel MCB 3 Pase MCB 16 A, 5 KA (NC45N) MG bh 302,038.66 299,018.27
120 Panel MCB 3 Pase MCB 16 A, 10 KA (NC100H) MG bh 301,340.22 298,326.81
121 Panel MCB 3 Pase MCB 25 A, 8 KA (NC45N) MG bh 285,353.59 282,500.05
122 Panel MCB 3 Pase MCB 40 A, 8 KA L (NC45N) MG bh 262,149.69 259,528.19
123 Panel MCB 3 Pase MCB 10 A, 8 KA (NC45N) MG bh 283,491.07 280,656.15
124 Panel MCB 1 Pase MCB 20 A, 10 KA (NC45N) MG bh 130,609.22 129,303.12
125 Panel MCB 1 Pase MCB 10 A, 8 KA (NC45N) MG bh 62,860.05 62,231.45
126 Panel MCB 1 Pase MCB 6 A, 8 KA (NC45N) MG bh 55,029.00 54,478.71
127 Panel MCB 1 Pase MCB 20 A, 8 KA (NC45N) MG bh 55,029.00 54,478.71
128 Panel MCB 1 Pase MCB 20 A, 5 KA (NC45Na) MG bh 62,860.05 62,231.45
129 Panel MCB 1 Pase MCB 10 A, 5 KA (NC45Na) MG bh 64,955.39 64,305.83
130 Panel MCB 1 Pase MCB 6 A, 5 KA (NC45Na) MG bh 65,809.04 65,150.95
131 Panel MCB 1 Pase MCB 25 A, 5 KA (NC45Na) MG bh 71,862.23 71,143.61
132 Panel MCB 1 Pase MCB 16 A, 5 KA (NC45Na) MG bh 65,653.83 64,997.29
133 Panel MCB 1 Pase MCB 16 A, 5 KA (NC45N) MG bh 65,110.60 64,459.49
134 Panel MCB 1 Pase MCB 6 A, 6 KA (NC45aD) MG bh 65,809.04 65,150.95
135 Panel MCB 1 Pase MCB 20 A, 8 KA (NC45N) MG bh 65,809.04 65,150.95
136 Panel MCB 1 Pase MCB 10 A, 8 KA (NC45N) MG bh 65,809.04 65,150.95
137 Panel MCB 1 Pase MCB 16 A, 5 KA (NC45N) MG bh 65,809.04 65,150.95
138 Panel MCB 1 Pase MCB 6 A, 5 KA (NC45N) MG bh 158,857.44 157,268.86
139 Panel MCB 1 Pase MCB 25 A, 5 KA (NC45N) MG bh 156,529.29 154,963.99
140 Panel MCB 1 Pase MCB 50 A, 10 KA (NC100H) MG bh 656,383.09 649,819.26
P. BAHAN ALAT PENGANTUNG DAN KUNCI 0
1 Kunci Silinder ALFA untuk Pintu Alumunium bh 451,131.98 446,620.66
2 Tarikan Pintu Alumunium bh 460,973.70 456,363.96
3 Kunci 2 Slaag ROYAL bh 184,666.98 182,820.31
4 Rel Henderson Lengkap bh 1,198,722.11 1,186,734.88
5 Rel maraton I Pintu unt 257,789.70 255,211.80
6 Kunci 2 Slaag Silinder SEIS Asli Tipe 210 s/d type 226 bh 408,366.92 404,283.25
7 Kunci 2 Slaag Ancor Asli bh 198,433.63 196,449.30
8 Kunci 2 Slaag ISO bh 260,654.03 258,047.49
9 Kunci KM Bulat Kualitas Biasa bh 94,687.51 93,740.63
10 Kunci kM Bulat ALFA bh 78,769.08 77,981.38
11 Kunci 2 Slaag Silinder Utama Standard bh 771,936.94 764,217.57
12 Kunci Gembok Besar bh 93,586.93 92,651.06
13 Kunci 2 Slaag Kuda Terbang bh 131,695.74 130,378.78
14 Kunci Lemari bh 113,613.72 112,477.58
15 Espangolet ps 67,141.45 66,470.04
16 Espangolet St. Steel bh 533,358.00 528,024.42
17 Casement ps 766,426.98 758,762.71
18 Grendel 15 cm bh 47,058.94 46,588.35
19 Grendel 5 cm bh 14,486.09 14,341.23
20 Grendel 7 cm bh 98,015.58 97,035.42
21 Hak Angin Kait Jendela Biasa ps 25,246.44 24,993.98
22 Hak Angin Jendela Antik ps 36,449.71 36,085.21
23 Hak Angin Sendok Stainless / Kuningan bh 43,693.97 43,257.03
24 Sloot Pintu Berikut Rantai bh 34,549.75 34,204.25
25 Sloot Jendela Tunggal bh 34,283.57 33,940.73
26 Sloot Handle Jendela bh 27,203.62 26,931.58
27 Engsel Pintu Union Standard ps 16,618.50 16,452.32
28 Engsel Jendela Unilon ps 38,776.50 38,388.74
29 Engsel Patrun ps 14,251.10 14,108.59
30 Engsel Harmonika ps 20,142.03 19,940.60
31 Floor Hinge ps 3,259,410.00 3,226,815.90
32 Door Closer Kelas Standard ( Kelas Sedang ) unt 715,967.08 708,807.41
33 Door Closer Kelas Standard ( Kelas Balk) unt 748,795.27 741,307.32
34 Door Closer Kelas Rendah unt 293,890.42 290,951.52
35 Door Holder unt 97,827.57 96,849.29
36 Door Stoper unt 97,827.57 96,849.29
37 Tarikan Almari Rata-rata bh 23,709.24 23,472.15
38 Rambuncis bh 559,720.55 554,123.34
39 Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' ) ml 136,499.59 135,134.59
40 Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' ) ml 136,499.59 135,134.59
41 Seng BJLS 30 / 3 x 0.3 mm lbr 114,351.51 113,207.99
42 Seng Plat lbr 77,277.55 76,504.77
43 Waterstop Lebar 200 mm ml 78,721.99 77,934.77
44 Kunci Tanam biasa buah 146,685.96 145,219.10
45 Kunci Tanam antik buah 166,185.00 164,523.15
46 Kunci Tanam Kamar Mandi buah 70,351.65 69,648.13
-
Q. BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN 0
1 Aspal Bitumen kg 47,974.00 47,494.26
2 Aspal ( ESO ) 1 Drum 155 kg kg 13,404.50 13,270.46
3 Aspal Emulsi kg 16,106.55 15,945.49
4 Aspal Curah kg 18,173.68 17,991.94
5 Aspal Concrete / Laston (AC -WC) ton 1,624,815.89 1,608,567.73
6 Aspal Threated Base ( ATB ) ton 1,580,320.00 1,564,516.80
7 Lataston / Hot Rolls Sheet ( HRS ) ton 1,855,465.00 1,836,910.35
8 Asphal RC 70 (Cilacap) Kg 15,521.00 15,365.79
9 Asphal Concrete (ATB) AC Base Ton 1,552,100.00 1,536,579.00
10 Asphal Concrete (ATB) AC -BC Ton 1,693,200.00 1,676,268.00
11 Asphal Concrete Wearing Course / AC-WC Ton 1,664,980.00 1,648,330.20
12 Lapis Asphal Resap Pengikat Ton 22,576.00 22,350.24
13 Lapis Asphal Perekat Ton 19,754.00 19,556.46
14 Beton Mortar M3 1,312,230.00 1,299,107.70
15 Beton BO M3 1,058,250.00 1,047,667.50
16 Beton K 100 M3 1,086,470.00 1,075,605.30
17 Beton K 125 M3 1,087,175.50 1,076,303.75
18 Beton K 150 M3 1,107,635.00 1,096,558.65
19 Beton K 175 M3 1,243,443.75 1,231,009.31
20 Beton K 200 M3 1,299,389.90 1,286,396.00
21 Beton K 225 M3 1,325,493.40 1,312,238.47
22 Beton K 250 M3 1,342,284.30 1,328,861.46
23 Beton K 275 M3 1,359,039.93 1,345,449.53
24 Beton K 300 M3 1,408,530.75 1,394,445.44
25 Beton K 325 M3 1,426,450.45 1,412,185.95
26 Beton K 350 M3 1,451,742.63 1,437,225.20
27 Beton K 375 M3 1,484,089.80 1,469,248.90
28 Beton K 400 M3 1,505,572.28 1,490,516.55
29 Beton K 425 M3 1,529,538.11 1,514,242.73
30 Beton K 450 M3 1,589,511.96 1,573,616.84
31 Beton K 475 M3 1,411,000.00 1,396,890.00
32 Beton K 500 M3 1,672,035.00 1,655,314.65
33 Beton K 550 M3 1,552,100.00 1,536,579.00
34 Beton K 600 M3 1,693,200.00 1,676,268.00
35 Beton K 650 M3 1,834,300.00 1,815,957.00
R. BAHAN PENGISAP AIR SUMUR DALAM 0
1 Pompa Kodok unit 270,912.00 268,202.88
2 Pompa Dragon Tegal unit 499,494.00 494,499.06
3 Pompa Dragon Asli unit 1,164,187.88 1,152,546.00
4 Mesin Pompa Air 100 W - Sanyo unit 1,696,122.89 1,679,161.66
5 Mesin Pompa Air 150 W - Sanyo unit 2,661,851.50 2,635,232.99
6 Pompa Zet Pump 250 W - Sanyo unit 8,154,451.20 8,072,906.69
7 Pompa Zet Pump 450 W - Sanyo unit 12,952,133.40 12,822,612.07
8 Pompa. Submersible kap. 150 liter / menit 3 KW unit 51,150,866.50 50,639,357.84
9 Gear Pump Kap. 60 liter / menit unit 23,210,950.00 22,978,840.50
10 Deep Well dengan kelengkapannya kap. 150 liter / menit unit 202,644,236.06 200,617,793.70
11 Hand Oil Pump unit 6,999,971.00 6,929,971.29
S. BAHAN PENAMPUNG AIR 0
1 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh 1,172,435.18 1,160,710.83
2 Tangki Air Fiber Glass 1 m3 ( Excel ) bh 1,875,896.28 1,857,137.32
3 Tangki Air Fiber Glass 2 m3 ( Excel ) bh 3,245,300.00 3,212,847.00
4 Tangki SST Tanpa Kaki GS-700 TK (Volume 600 Liter, D-T 87 - 115) unit 1,515,414.00 1,500,259.86
5 Tangki SST Tanpa Kaki GS-1000 TK (Volume 800 Liter, D-T 87 - 140) unit 1,515,414.00 1,500,259.86
6 Tangki SST Tanpa Kaki GS-1500 TK (Volume 1000 Liter, D-T 99 - 145) unit 1,752,462.00 1,734,937.38
7 Tangki SST Tanpa Kaki GS-1800 TK (Volume 1500 Liter, D-T 99 - 205) unit 1,752,462.00 1,734,937.38
8 Tangki SST Tanpa Kaki GS-2000 TK (Volume 1000 Liter, D-T 99 - 145) unit 1,752,462.00 1,734,937.38
9 Tangki SST Tanpa Kaki GS-2500 TK (Volume 1500 Liter, D-T 99 - 205) unit 1,752,462.00 1,734,937.38
10 Tangki SST Tanpa Kaki GS-3000 TK (Vol 2100 Ltr, D-T 145 - 150) unit 3,555,720.00 3,520,162.80
11 Tangki SST Tanpa Kaki GS-4000 TK (Vol 3100 ltr, D-T 145 - 210) unit 5,308,182.00 5,255,100.18
12 Tangki SST Tanpa Kaki GS-5000 TK (Vol 4000 ltr, D-T 145 - 265) unit 17,483,475.24 17,308,640.49
13 Tangki SST Tanpa Kaki GS-6000 TK (Vol 5000 ltr, D-T 145 - 325) unit 20,673,139.51 20,466,408.11
14 Tangki SST Pakai Kaki 700 TK (Volume 660 Liter, D-T 87 - 155) unit 2,879,145.50 2,850,354.05
15 Tangki SST Pakai Kaki 1000 TK (Volume 800 Liter, D-T 87 - 175) unit 3,498,433.40 3,463,449.07
16 Tangki SST Pakai Kaki 1500 TK (Volume 1100 Liter, D-T 99 - 180) unit 4,128,586.00 4,087,300.14
17 Tangki SST Pakai Kaki 1800 TK (Volume 1500 Liter, D-T 99 - 240) unit 5,627,914.60 5,571,635.45
18 Tangki SST Pakai Kaki 2000 TK (Volume 1100 Liter, D-T 99 - 180) unit 4,878,250.30 4,829,467.80
19 Tangki SST Pakai Kaki 2500 TK (Volume 1500 Liter, D-T 99 - 240) unit 6,627,467.00 6,561,192.33
20 Tangki SST Pakai Kaki 3000 TK (Volume 2300 Liter, D-T 145 - 195) unit 9,813,787.20 9,715,649.33
21 Tangki SST Pakai Kaki 4000 TK (Volume 3200 Liter, D-T 145 - 250) unit 13,867,308.00 13,728,634.92
22 Tangki Silinder Excel GE - 250 (Volume 250 Liter) unit 906,433.46 897,369.12
23 Tangki Silinder Excel GE - 300 (Volume 300 Liter) unit 906,433.46 897,369.12
24 Tangki Silinder Excel GE - 550 (Volume 550 Liter) unit 1,417,067.30 1,402,896.63
25 Tangki Silinder Excel GE - 600 (Volume 600 Liter) unit 1,414,245.30 1,400,102.85
26 Tangki Silinder Excel GE - 700 (Volume 700 Liter) unit 1,509,064.50 1,493,973.86
27 Tangki Silinder Excel GE - 800 (Volume 800 Liter) unit 1,889,329.00 1,870,435.71
28 Tangki Silinder Excel GE - 1100 VB (Volume 1050 Liter) unit 2,278,059.50 2,255,278.91
29 Tangki Silinder Excel GE - 1200 VB (Volume 1050 Liter) unit 2,278,059.50 2,255,278.91
30 Tangki Silinder Excel GE - 1100 (Volume 1150 Liter) unit 2,458,526.40 2,433,941.14
31 Tangki Silinder Excel GE - 1100 GT (Volume 1150 Liter) unit 2,458,526.40 2,433,941.14
32 Tangki Silinder Excel GE - 1600 (Volume 1600 Liter) unit 3,336,450.60 3,303,086.09
33 Tangki Silinder Excel GE - 2000 (Volume 2000 Liter) unit 4,364,349.99 4,320,706.49
34 Tangki Silinder Excel GE - 2250 (Volume 2250 Liter) unit 4,801,350.80 4,753,337.29
35 Tangki Silinder Excel GE - 3100 (Volume 3100 Liter) unit 6,422,872.00 6,358,643.28
36 Tangki Silinder Excel GE -3250 (Volume 3250 Liter) unit 83,021,829.00 82,191,610.71
37 Tangki Silinder Excel GE - 5200 (Volume 5200 Liter) unit 10,246,569.12 10,144,103.43
38 Tangki Sunder Excel GE - 11000 (Volume 11000 Liter) unit 24,224,824.05 23,982,575.81
39 Tangki Silinder Dapat Disusun Excel GE - 1000 SN (Volume 1000 Liter) unit 2,669,456.79 2,642,762.22
40 Tangki Silinder Dapat Disusun Excel GE - 2000 SN (Volume 2000 Liter) unit 4,448,883.00 4,404,394.17
41 Tangki Silinder Dapat Disusun Excel GE - 3000 SN (Volume 3000 Liter) unit 7,519,219.00 7,444,026.81
Tangki Tanam / Pendam (Dengan Pelindung Beton) Excel Lumba-Lumba GE - 550 K
42 unit 1,938,714.00 1,919,326.86
(Volume 550 Liter)
Tangki Tanam / Pendam (Dengan Pelindung Beton) Excel Lumba-Lumba GE - 1100 K
43 unit 3,622,037.00 3,585,816.63
(Volume 1100 Liter)
Tangki Tanam / Pendam (Dengan Pelindung Beton) Excel Lumba-Lumba GE - 2100 K
44 unit 6,990,094.00 6,920,193.06
(Volume 2100 Liter)
Tangki Tanam / Pendam (Dengan Pelindung Beton) Excel Lumba-Lumba GE - 2500 K
45 unit 8,985,248.00 8,895,395.52
(Volume 2500 Liter)
46 Tangki Tanam / Pendam (Langsung Pendam) GE - 550 ST (Volume 550 Liter) unit 1,938,714.00 1,919,326.86
47 Tangki Tanam / Pendam (Langsung Pendam) GE - 1100 ST (Volume 1100 Liter) unit 3,622,037.00 3,585,816.63
48 Tangki Tanam / Pendam (Langsung Pendam) GE - 2100 ST (Volume 2100 Liter) unit 6,990,094.00 6,920,193.06
Tangki Tanam / Pendam (Langsung
49 Pendam) GE - 2500 ST (Volume 2500 . unit 8,985,248.00 8,895,395.52
Liter)
50 Tangki Horisontal GE - 5000 H (Volume 550 Liter) unit 16,600,415.00 16,434,410.85
51 Bak KM Fiber 60 x 60 bh 390,811.73 386,903.61
52 Bak Taraso WC 40 x 40 bh 70,550.00 69,844.50
53 Bak KM Taraso 60 x 60 bh 203,184.00 201,152.16
T. ALAT TUKANG 0
1 Palu 0.5 kg bh 90,304.00 89,400.96
2 Cangkul bh 97,359.00 96,385.41
3 Singkup bh 90,304.00 89,400.96
4 Sekrop bh 97,359.00 96,385.41
5 Pengki bh 21,165.00 20,953.35
6 Linggis bh 97,359.00 96,385.41
7 Rool Meter 30 meter ( Bahan Plastik ) bh 128,401.00 127,116.99
8 Rool Meter 5 meter ( Bahan Besi ) bh 36,686.00 36,319.14
9 Selang Plastik untuk Water Pas dia. 0.5cm m 2,822.00 2,793.78
10 Water Pas Alumunium 60 cm bh 60,673.00 60,066.27
U. BAHAN BAKAR DAN PELUMAS 0
1 Minyak Tanah lt 17,987.79 17,807.91
2 Kayu Bakar dari Kayu Karet m3 104,091.42 103,050.51
3 Bahan Bakar Residu lt 8,763.19 8,675.56
4 Minyak Solar lt 8,763.19 8,550.00
5 Bensin Premium lt 9,602.85 9,506.82
6 Plus Oil lt 59,397.17 58,803.20
7 Oil Mesran 40 SAE lt 59,397.17 58,803.20
8 Elpiji / botol 15 kg 192,279.37 190,356.58
15.1
9 Asitilin / Botol 155,844.37 154,285.93
kg btl
10 Angin ( 02 ) / botol btl 104,091.42 103,050.51
11 Karbit kg 18,525.02 18,339.77
12 Minyak Bekisting ltr 50,623.76 50,117.52
13 Rapidrant Gln 27,704.99 27,427.94
14 Soda Api kg 39,984.09 39,584.25
15 Sabun kg 10,104.17 10,003.13
16 Arang Kayu kg 10,973.35 10,863.61
17 Kawat Las bh 35,275.00 34,922.25
V. BAHAN PAGAR 0
1 Panel Beton Pracetak lbr 203,222.10 201,189.88
2 Kolom Beton Pracetak btg 450,215.11 445,712.96
W. BAHAN PENANGKAL PETIR 0
1 EF Lighting Terminal Radius > 110 m2 unit 714,354.03 707,210.48
2 Counecting Sleeve bh 214,795.12 212,647.17
3 EF Coaxcial Cable ml 695,340.80 688,387.39
Grounding Terdiri Dan Earth Steel Coppir Rod 5/8", Earth Road Camping, Earth Road
4 unit 46,935,504.00 46,466,148.96
Clomp, Driving TIP & Driving Stud
5 Indelek Prevectron 2 Type S 4.50 unit 3,969,309.50 3,929,616.40
6 Grounding System Max. 2 OHM + Box unit 209,471.42 207,376.70
7 Biaya Instalasi unit 7,212,284.17 7,140,161.33
X. FIRE ALARM 0
1 Alarm Bell unit 289,109.67 286,218.57
2 Manual Break Glass Push Button unit 573,982.10 568,242.28
3 Sirine unit 473,483.63 468,748.79
4 Smoke Detector unit 310,839.07 307,730.68
5 Heat Detector unit 170,249.85 168,547.35
Y. BIDANG PERTAMANAN 0
1 Aglonema batang 63,914.86 63,275.71
2 Bambu krisik/jepang batang 63,914.86 63,275.71
3 Furadan kg 28,356.87 28,073.30
4 Kompos/pupuk kandang karung 32,050.87 31,730.36
5 M atoa (2 m) batang 44,762.56 44,314.94
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang 135,156.87 133,805.30
7 Philo batang 96,695.83 95,728.87
8 Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m batang 29,117.40 28,826.22
9 Pohon perdu (kaca piring, puring, mawar, melati, dll) batang 16,948.93 16,779.44
10 Rumput gajah mini m2 21,294.81 21,081.86
Rumput manila m2 135,000.00
Z. BIDANG PENGAIRAN 0
1 Batu Belah 10 - 15 cm M3 216,997.69 214,827.71
2 Batu Pecah 5 - 7 cm M3 282,200.00 279,378.00
3 Batu Pecah 0,5 - 1 cm M3 292,570.85 289,645.14
4 Batu Pecah tersaring A M3 241,097.57 238,686.59
5 Batu Pecah tersaring B M3 233,294.74 230,961.79
6 Timbunan Pilthan M3 198,132.62 196,151.29
7 Makadam M3 114,079.35 112,938.56
8 Kayu Damar Laut M3 7,231,248.01 7,158,935.53
9 Kayu Klas I M3 5,974,794.84 5,915,046.89
10 Kayu Klas III M3 2,671,333.42 2,644,620.09
11 Kayu Kano 4/6 BTG 72,497.18 71,772.21
12 Papas 2/20 x 4 LBR 91,461.02 90,546.41
13 Balok Kayu 6 - 8 - 10 /4 m BTG 399,327.11 395,333.84
14 Batang Kelapa 13TG 576,125.41 570,364.16
15 Lempengen rumput M2 48,002.22 47,522.20
16 Triplek tb. 3 mm LBR 67,492.83 66,817.91
17 Triplek tb. 4 mm LBR 84,895.17 84,046.22
18 Triplek tb. 6 mm LBR 64,906.00 64,256.94
19 Triplek tb. 9 mm LBR 125,579.00 124,323.21
20 Multiplek 12 mm LBR 177,687.23 175,910.36
21 Seng gelombang BJLS 30 LBR 33,864.00 33,525.36
22 Seng Plat 3 x 6 BWG 30 M2 49,385.00 48,891.15
23 Conblock M2 53,928.42 53,389.14
24 Batako PSPM BH 5,432.35 5,378.03
25 Pipa Beton Tidak Bertulang dia 0,50 m M' 151,710.72 150,193.61
26 Pipa Beton Tidak Bertulang dia 0,60 m M' 183,712.20 181,875.08
27 Pipa Beton Tidak Bertulang dia 0,80 m M' 261,246.65 258,634.18
28 Pipa Beton Tidak Bertulang dia 1,00 m M' 339,077.41 335,686.64
29 Pipa Beton Bertulang dia 0,50 m M' 160,698.79 159,091.80
30 Pipa Beton Bertulang dia 0,60 m M' 205,441.60 203,387.18
31 Pipa Beton Bertulang dia 0,80 m M' 399,919.73 395,920.53
32 Pipa Beton Bertulang dia 1,00 m M' 265,493.76 262,838.82
33 Besi Beton U24 dia. 14 mm BTG 125,536.67 124,281.30
34 Besi Beton U24 dia. 22 mm BTG 287,321.93 284,448.71
35 Besi Beton U24 dia. 25 mm BTG 366,634.24 362,967.90
36 Besi Beton U32 dia. 10 mm BTG 228,158.70 225,877.11
37 Besi Beton U32 dia. 12 mm BTG 130,376.40 129,072.64
38 Besi Beton U32 dia. 16 mm BIG 167,711.46 166,034.35
39 Besi Beton U32 dia. 19 mm BIG 266,185.15 263,523.30
40 Besi Beton U32 dia. 22 mm BIG 336,805.70 333,437.64
41 Besi Beton U32 dia. 25 mm BTG 380,264.50 376,461.86
42 Besi Beton Ulir 10 BIG 103,412.19 102,378.07
43 Besi Beton Ulir 12 BIG 135,216.13 133,863.97
44 Besi Beton Ulir 16 BTG 201,490.80 199,475.89
45 Besi Beton Ulir 19 BIG 270,432.26 267,727.94
46 Besi Beton Ulir 22 BIG 366,140.39 362,478.99
47 Besi Beton Ulir 25 BTG 475,182.47 470,430.65
48 Baja U 24 KG 77,336.91 76,563.54
49 Baja U 32 KG 36,544.90 36,179.45
50 Baja U 36 KG 82,966.80 82,137.13
51 Baja U 42 KG 115,363.36 114,209.73
52 Wermes 06 M2 244,455.75 242,011.19
53 Wermes 08 M2 461,749.75 457,132.25
54 Wermes 10 M2 597,558.50 591,582.92
55 Besi Pofil 4x4 KG 26,075.28 25,814.53
56 Besi Struktur H- Beam KG 29,235.92 28,943.56
57 Besi C macam-macaw ukuran KG 16,297.05 16,134.08
58 Besi L macam-macam ukuran KG 22,815.87 22,587.71
59 Pipa Galvanis 2,5" BTG 309,643.95 306,547.51
60 Pipa Galvanis 3" BTG 543,235.00 537,802.65
61 Pipa Galvanis 4" BTG 706,205.50 699,143.45
62 Kawat Bronjong 3 mm KG 87,213.91 86,341.77
63 Kawat Bronjong 5 mm KG 125,339.13 124,085.74
64 Stempet / Gemuk KG 54,224.73 53,682.48
65 0li SAE 140 LTR 66,274.67 65,611.92
66 Oli SAE 90 LTR 71,114.40 70,403.26
67 Oli SAE 20 LTR 45,730.51 45,273.20
68 Laston SPC TONNE 1,303,764.00 1,290,726.36
69 Cat (untuk besi profil) KG 54,817.35 54,269.18
70 Meni KG 30,915.01 30,605.86
71 Glass Bead KG 14,124.11 13,982.87
72 Cat Marka Jalan (thermo pastic) 5 KG 119,511.70 118,316.58
73 Kapur Hidrasi M3 9,235.00 9,142.65
74 Pipa PVC dia 5" BTG 554,099.70 548,558.70
75 Pipa PVC dia 12" BTG 1,035,702.22 1,025,345.20
76 Saluran Beton (Uditch) Stu 50/50 - 120 M' 1,303,764.00 1,290,726.36
77 Saluran Beton (Uditch) Stu 60/60 - 120 M' 1,521,058.00 1,505,847.42
78 Saluran Beton (Uditch) Stu 80/80 - 120 M' 2,814,945.00 2,786,795.55
79 Saluran Beton (Uditch) Stu 100/100 - 120 M' 4,291,556.50 4,248,640.94
80 Box Culvert BC 50-50-100 M' 1,097,758.00 1,086,780.42
81 Box Culvert BC 60-60-100 M' 1,207,533.80 1,195,458.46
82 Box Culvert BC 80-80-100 M' 2,650,704.60 2,624,197.55
83 Box Culvert BC 100-100-100 M' 3,230,766.70 3,198,459.03
84 Karet Penyambung Piga dia 50 cm BH 83,954.50 83,114.96
85 Karet Penyambung Piga dia 60 cm BH 105,387.59 104,333.71
86 Karet Penyambung Pipa dia 80 cm BH 146,673.45 145,206.72
87 Karet Penyambung Pipa dia 100 cm BH 239,023.40 236,633.17
88 Plat Penjepit 12x4x8 mm LBR 2,879,145.50 2,850,354.05
89 Besi UNP 20 (200x80x7,5 mm) BTG/ 6 m 706,205.50 699,143.45
90 Besi Essentaal 1,5-64 mm KG 59,755.85 59,158.29
91 Kuningan 3" KG 157,044.30 155,473.86
92 Bambu BH 31,507.63 31,192.55
93 Baud 1,5 BH 11,161.01 11,049.40
94 Baud Uk 3/4 - 7 cm BH 40,693.24 40,286.31
95 Baud Uk 3/4 - 17 cm BH 34,075.65 33,734.89
96 Cat Glotek Hitam (setara) KG 51,557.94 51,042.36
97 Cat Glotek Biru (setara) KG 53,138.26 52,606.88
98 Amplas LBR 5,531.12 5,475.81
99 Prasasti 40 can x 60 cm BH 651,882.00 645,363.18
100 Prasasti 20 cm x 30 cm BH 543,235.00 537,802.65
Tambahan Harga Bahan 0
1 Rangka hollow besi Alucobond 40 x 60 x 2,1mm 40 x 60 x 2,1mm bt 41,388.86 40,974.97
2 Rangka hollow besi Alucobond 40 x 40 x 1,1mm 40 x 40 x 1,1mm bt 19,919.09 19,719.90
3 Braket siku besi Alucobond 40 x 40 x 4mm 40 x 40 x 4mm bt 7,760.50 7,682.90
4 Brazing Alucobond m2 62,084.00 61,463.16
5 Braket Alucobond m2 2,116.50 2,095.34
6 Aluminium Composite Panel / ACP bh 260,752.80 258,145.27
7 Main frame 170cm ( STEGER ) bt 232,815.00 230,486.85
8 Cross Brace bh 70,550.00 69,844.50
9 Join Pin bh 7,055.00 6,984.45
PRODUK GALVALUM TRUSS 0
1 Truss Profil U, T min 0.83 mm m' 190,485.00 188,580.15
2 PROFIL U 75 TEBAL 0.53 mm m' 132,634.00 131,307.66
3 PROFIL U 100 TEBAL 0.53 mm m' 174,964.00 173,214.36
4 PROFIL U 100 TEBAL 0.83 mm m' 261,035.00 258,424.65
5 PROFIL U 60 TEBAL 0.53 MM m' 119,935.00 118,735.65
6 RENG 39 m' 63,495.00 62,860.05
7 RENG 36 m' 56,440.00 55,875.60
8 RENG 29 m' 49,385.00 48,891.15
9 PROFIL C75 TEBAL 0.6 MM m' 84,660.00 83,813.40
10 PROFIL C75 TEBAL 0.65 MM m' 90,304.00 89,400.96
11 PROFIL C75 TEBAL 0.7 MM m' 97,359.00 96,385.41
12 PROFIL C75 TEBAL 0.75 MM m' 100,181.00 99,179.19
13 PROFIL C75 TEBAL 0.95 MM m' 132,634.00 131,307.66
14 RENG m' 42,330.00 41,906.70
Semen Mortar Utama 0
1 MU-100 Plester Premium40 kg kg 2,116.50 2,095.34
2 MU-200 Acian Plester & Beton 5 kg kg 6,067.30 6,006.63
3 MU-200 Acian Plester & Beton 40 kg kg 5,591.09 5,535.18
4 MU-260 Acian Profil 25 kg kg 10,751.82 10,644.30
5 MU-270 Acian Putih 25 kg kg 8,804.64 8,716.59
6 MU-300 Pasangan Bata 40 kg kg 1,781.39 1,763.57
7 MU-301 Pas Bata & Plester 10 kg kg 296.31 293.35
8 MU-301 Pas Bata & Plester 40 kg kg 2,028.31 2,008.03
9 MU-380 Perekat Bata Ringan 5 kg kg 5,926.20 5,866.94
10 MU-380 Perekat Bata Ringan 40 kg kg 5,291.25 5,238.34
11 MU-400 Perekat Keramik Dinding 5 kg kg 9,877.00 9,778.23
12 MU-410 Self Leveling Floor 25 kg kg 14,392.20 14,248.28
13 MU-440 Perata Lantai 40 kg kg 1,940.13 1,920.72
14 MU-445 Perata Lantai Premium 40 kg kg 3,703.88 3,666.84
15 MU-450 Perekat Keramik Lantai 5 kg kg 9,453.70 9,359.16
16 MU-450 Perekat Keramik Lantai 40 kg kg 57,851.00 57,272.49
17 MU-460 Perekat Keramik Daerah Basah 25 kg kg 24,748.94 24,501.45
18 MU-470 White Tile Addesive 25 kg kg 21,729.40 21,512.11
19 MU-480 Perekat Keramik diatas Keramik 5 kg kg 21,306.10 21,093.04
20 MU-L500 Perekat Mortar & Beton 2 kg karung 289,960.50 287,060.90
21 MU-600 Pelapis Kedap Air 3 kg karung 162,265.00 160,642.35
22 MU-600 Pelapis Kedap Air 30 kg kg 6,608.18 6,542.10
23 MU-700 Floor Hardener 25 kg kg 8,861.08 8,772.47
24 MU-800 Non-Shrink Grout 40 kg kg 5,538.18 5,482.79
25 MU-830 Perbaikan Permukaan Beton 40 kg kg 9,277.33 9,184.55
26 MU-840 Finish Coat Repair 25 kg kg 18,343.00 18,159.57
Bahan Pabrikasi 0
1 Plavond PVC (setara shunda, Flat Gloss Half Silver m2 99,000.00 98,010.00
2 screw buah 350.00 346.50
3 Plat Bondex m2 140,000.00 138,600.00
4 Aluminum Composite Panel type PVDF 0.3 warna Silver m2 450,000.00 445,500.00
5 Water Proofing Coating setara Fosroc/Sika/Aquaproof kg 42,500.00 42,075.00
6 Rangkap baja ringan + Genteng metal pasir m2 190,000.00 188,100.00
7 Spardek m2 110,700.00 109,593.00
8 Kayu Bekisting m3 1,500,000.00 1,485,000.00

Keterangan :
Untuk harga material di atas sudah termasuk keuntungan dan ketentuan pajak yang berlaku.
STANDAR HARGA SATUAN
A. HARGA SATUAN UPAH

DAFTAR HARGA SATUAN UPAH

UPAH (SWAKELOLA) UPAH (KONTRAKTUAL)


URAIAN
Nomor Org/jam Org/hr Orang / jam Orang / hari
Tahun 2015

1 Mandor Rp 13,637.40 Rp 109,099.20 Rp 19,759.32 Rp 160,000.00

2 Kepala Tukang Rp 12,836.20 Rp 102,689.60 Rp 15,379.95 Rp 124,000.00


3 Kepala Tukang Batu Rp 12,835.20 Rp 102,681.60 Rp 15,379.95 Rp 124,000.00
4 Kepala Tukang Kayu Rp 12,835.20 Rp 102,681.60 Rp 15,379.95 Rp 124,000.00
5 Kepala Tukang Besi Rp 12,835.20 Rp 102,681.60 Rp 15,379.95 Rp 124,000.00
6 Kepala Tukang Cat Rp 12,835.20 Rp 102,681.60 Rp 15,379.95 Rp 124,000.00
7 Kepala Tukang Listrik Rp 12,835.20 Rp 102,681.60 Rp 15,379.95 Rp 124,000.00

8 Tukang Rp 11,230.80 Rp 89,846.40 Rp 13,294.35 Rp 107,000.00


9 Tukang Batu Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 107,000.00
10 Tukang Kayu Rp 12,033.00 Rp 96,264.00 Rp 13,236.30 Rp 107,000.00
11 Tukang Besi/Baja Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 107,000.00
12 Tukang Aluminium Rp 12,033.00 Rp 96,264.00 Rp 13,236.30 Rp 107,000.00
13 Tukang Cat Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 107,000.00
14 Tukang Listrik Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 107,000.00
15 Tukang Pipa Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 107,000.00
16 Tukang Plitur Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 107,000.00

17 Tukang Taman Rp 11,230.80 Rp 89,846.40 Rp 17,986.72 Rp 145,791.25


18 Pembantu Tukang Rp 8,022.00 Rp 64,176.00 Rp 11,209.11 Rp 90,855.42
19 Pekerja Biasa Rp 8,022.00 Rp 64,176.00 Rp 9,645.05 Rp 78,000.00
20 Penjaga Malam Rp 8,022.00 Rp 64,176.00 Rp 11,469.79 Rp 92,968.33

21 Sopir Rp 11,230.80 Rp 89,846.40 Rp 15,379.95 Rp 124,662.08


22 Operator Rp 12,835.20 Rp 102,681.60 Rp 15,379.95 Rp 124,662.08
23 Mekanik Rp 11,230.80 Rp 89,846.40 Rp 15,379.95 Rp 124,662.08

24 Pembantu Sopir Rp 9,626.40 Rp 77,011.20 Rp 11,469.79 Rp 92,968.33


25 Pembantu Operator Rp 9,626.40 Rp 77,011.20 Rp 11,469.79 Rp 92,968.33
26 Pembantu Mekanik Rp 9,626.40 Rp 77,011.20 Rp 11,469.79 Rp 92,968.33
A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN

Analisa Harga Satuan Pekerjaan Persiapan


Sesuai RSNI T-12-2002
HARGA 2016.
NO URAIAN SATUAN VOLUME
SATUAN JUMLAH

A-04 1 M2 Pengukuran dan Pasang Bouwplank


Kayu 5/7 M3 0.0120 2,437,492.73 29,249.91
Paku Biasa 2"-5" Kg 0.0200 23,988.03 479.76
Kayu Papan 3/20 M3 0.0070 2,303,324.10 16,123.27
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang Kayu Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 66,392.94
B. ANALISA HARGA SATUAN PEKERJAAN TANAH

Analisa Harga Satuan Pekerjaan Tanah


Sesuai SNI 2835:2008
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH

B-01 Menggali 1 m3 tanah biasa sedalam 1 meter


Pekerja Oh 0.7500 78,000.00 58,500.00
Mandor Oh 0.0250 160,000.00 4,000.00
Jumlah 62,500.00
B-09 Mengurug kembali 1 m3 galian
Mengurug kembali 1 m3 galian dihit dari 1/3 kali dari indeks pek galian 20,833.33
B-10 Memadatkan 1 m3 tanah (per 20 cm)
Pekerja Oh 0.5000 78,000.00 39,000.00
Mandor Oh 0.0500 160,000.00 8,000.00
Jumlah 47,000.00
B-11 Mengurug 1 m3 pasir urug
Pasir urug m3 1.2000 235,143.15 282,171.78
Pekerja Oh 0.3000 78,000.00 23,400.00
Mandor Oh 0.0100 160,000.00 1,600.00
Jumlah 307,171.78
C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

Analisa Harga Satuan Pekerjaan Pondasi


Sesuai SNI 2836:2008
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH

C-03 Memasang 1 m3 Pondasi Batu belah campuran 1 PC : 5 PS


Batu belah 15/20 cm m3 1.2000 289,467.39 347,360.86
Semen Portland Kg 136.0000 1,800.00 244,800.00
Pasir Pasang m3 0.5440 317,260.95 172,589.96
Pekerja Oh 1.5000 78,000.00 117,000.00
Tukang Batu Oh 0.7500 107,000.00 80,250.00
Kepala Tukang Oh 0.0750 124,000.00 9,300.00
Mandor Oh 0.0750 160,000.00 12,000.00
JUMLAH 983,300.82
D. ANALISA HARGA SATUAN PEKERJAAN BETON

Analisa Harga Satuan Pekerjaan Beton


Sesuai SNI 7394:2008
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH
D-05 Membuat 1 m3 lantai kerja beton mutu f'c = 14,5 Mpa (K175), slump (12±2)cm w/c = 0,66
Semen Portland kg 326.0000 1,800.00 586,800.00
Pasir Beton m3 0.5429 355,951.32 193,245.97
kerikil Kg 1,029.0000 175.78 180,876.01
Air ltr 215.0000 4.95 1,064.25
Pekerja Oh 1.6500 78,000.00 128,700.00
Tukang Batu Oh 0.2750 107,000.00 29,425.00
Kepala Tukang Oh 0.0280 124,000.00 3,472.00
Mandor Oh 0.0830 160,000.00 13,280.00
JUMLAH 1,136,863.23
D-07 Membuat 1 m3 lantai kerja beton mutu f'c = 19,3 Mpa (K225), slump (12±2)cm w/c = 0,58
Semen Portland kg 371.0000 1,800.00 667,800.00
Pasir Beton m3 0.4986 355,951.32 177,477.33
kerikil Kg 1,047.0000 175.78 184,040.02
Air ltr 215.0000 4.95 1,064.25
Pekerja Oh 1.6500 78,000.00 128,700.00
Tukang Batu Oh 0.2750 107,000.00 29,425.00
Kepala Tukang Oh 0.0280 124,000.00 3,472.00
Mandor Oh 0.0830 160,000.00 13,280.00
JUMLAH 1,205,258.59
D-10 Membuat 1 m3 lantai kerja beton mutu f'c = 26,4 Mpa (K300), slump (12±2)cm w/c = 0,52
Semen Portland kg 413.0000 1,800.00 743,400.00
Pasir Beton m3 0.4864 355,951.32 173,134.72
kerikil Kg 1,021.0000 175.78 179,469.77
Air ltr 215.0000 4.95 1,064.25
Pekerja Oh 1.6500 78,000.00 128,700.00
Tukang Batu Oh 0.2750 107,000.00 29,425.00
Kepala Tukang Oh 0.0280 124,000.00 3,472.00
Mandor Oh 0.0830 160,000.00 13,280.00
JUMLAH 1,271,945.74
D-21 Memasang 1 m2 bekisting untuk Sloof
Kayu Papan kelas III m3 0.0450 1,645,231.50 74,035.42
paku 5 - 10 cm kg 0.3000 18,571.37 5,571.41
Minyak bekisting ltr 0.1000 50,117.52 5,011.75
Pekerja Oh 0.5200 78,000.00 40,560.00
Tukang kayu Oh 0.2600 107,000.00 27,820.00
Kepala Tukang Oh 0.0260 124,000.00 3,224.00
Mandor Oh 0.0260 160,000.00 4,160.00
JUMLAH 160,382.58
D-22 Memasang 1 m2 bekisting untuk Kolom
Kayu Papan kelas III m3 0.0400 1,645,231.50 65,809.26
Paku 5 -12 cm kg 0.4000 18,571.37 7,428.55
Minyak bekisting ltr 0.2000 50,117.52 10,023.50
Balok kayu kelas II m3 0.0150 2,742,052.50 41,130.79
Multiplek tebal 9 mm lbr 0.3500 213,570.79 74,749.78
Dolken kayu galam, ф (8-10), panjang 4 m btg 2.0000 24,130.06 48,260.12
Pekerja Oh 0.6600 78,000.00 51,480.00
Tukang kayu Oh 0.3300 107,000.00 35,310.00
Kepala Tukang Oh 0.0330 124,000.00 4,092.00
Mandor Oh 0.0330 160,000.00 5,280.00
JUMLAH 343,564.00
D-24 Memasang 1 m2 bekisting untuk plat lantai
Kayu Papan kelas III m3 0.0400 1,645,231.50 65,809.26
Paku 5 -12 cm kg 0.4000 18,571.37 7,428.55
Minyak bekisting ltr 0.2000 50,117.52 10,023.50
Balok kayu kelas II m3 0.0150 2,742,052.50 41,130.79
Multiplek tebal 9 mm lbr 0.3500 213,570.79 74,749.78
Dolken kayu galam, ф (8-10), panjang 4 m btg 6.0000 24,130.06 144,780.37
Pekerja Oh 0.6600 78,000.00 51,480.00
Tukang Kayu Oh 0.3300 107,000.00 35,310.00
Kepala Tukang Oh 0.0330 124,000.00 4,092.00
Mandor Oh 0.0330 160,000.00 5,280.00
JUMLAH 440,084.25
D-28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Kayu Papan kelas III m3 0.2000 1,645,231.50 329,046.30
Paku 5 -12 cm kg 1.5000 18,571.37 27,857.06
Minyak bekisting ltr 0.4000 50,117.52 20,047.01
Besi beton polos kg 157.5000 9,549.46 1,504,040.08
Kawat beton kg 2.2500 23,214.21 52,231.98
Semen Portland kg 336.0000 1,800.00 604,800.00
Pasir beton m3 0.5400 355,951.32 192,213.71
Koral beton m3 0.8100 237,300.88 192,213.71
Pekerja Oh 5.3000 78,000.00 413,400.00
Tukang Batu Oh 0.2750 107,000.00 29,425.00
Tukang Kayu Oh 1.3000 107,000.00 139,100.00
Tukang Besi Oh 1.0500 107,000.00 112,350.00
Kepala Tukang Oh 0.2620 124,000.00 32,488.00
Mandor Oh 0.2650 160,000.00 42,400.00
JUMLAH 3,691,612.85
Membuat 1 m3 Sloof beton bertulang 15 x 20 cm, 6dia10-Dia 8-15 Cm(201 kg besi + bek)
Bekisting 1x Pakai m2 13.3330 160,382.58 2,138,380.95
Besi U.24 rata-rata m3 180.0000 11,820.95 2,127,770.47
Membuat 1 m3 beton mutu (K175) m3 1.0000 1,136,863.23 1,136,863.23
5,403,014.65

Membuat 1 m3 Sloof beton bertulang 11x 11 CM, 4 dia.10-Dia 8-20 (260 kg besi + bek)
Bekisting 1x Pakai m2 9.0909 160,382.58 1,458,023.46
Besi U.24 rata-rata Kg 260.0000 11,820.95 3,073,446.23
Membuat 1 m3 beton mutu (K175) m3 1.0000 1,136,863.23 1,136,863.23
JUMLAH 5,668,332.92

Membuat 1 m3 kolom beton bertulang 11 x 11 cm, 4 Dia 10 - Dia 8 - 20 Cm (260 kg besi + bek)
Bekisting 2x Pakai m2 9.0909 343,564.00 3,123,309.09
Besi U.24 rata-rata Kg 260.0000 11,820.95 3,073,446.23
Membuat 1 m3 beton mutu (K175) m3 1.0000 1,136,863.23 1,136,863.23
JUMLAH 7,333,618.55

HIT-6 Membuat 1 m3 kolom beton bertulang 15 x 20 cm, 4 Dia 12 - Dia 8 - 15 Cm(180 kg besi + bek)
Bekisting 2x Pakai m2 9.1667 343,564.00 3,149,336.67
Besi U.24 rata-rata Kg 180.0000 11,820.95 2,127,770.47
Membuat 1 m3 beton mutu (K175) m3 1.0000 1,136,863.23 1,136,863.23
JUMLAH 6,413,970.37
HIT- 10 Membuat 1 m3 balok beton bertulang 11 x 11 cm, 4 dia.10, 8-15, (260 kg besi + bek)
Bekisting 2x Pakai m2 9.0909 351,790.16 3,198,092.34
Besi U.24 rata-rata Kg 260.0000 11,820.95 3,073,446.23
Membuat 1 m3 beton mutu (K225) m3 1.0000 1,205,258.59 1,205,258.59
JUMLAH 7,476,797.17
HIT-15 Membuat 1 m3 Balok beton bertulang 15 x 20 cm, 4 dia.12, 8-15 (180 kg besi + bekisting)
Bekisting 2 x Pakai m2 6.6667 351,790.16 2,345,261.86
Besi U.24 rata-rata Kg 180.0000 11,820.95 2,127,770.47
Membuat 1 m3 beton mutu (K175) m3 1.0000 1,136,863.23 1,136,863.23
JUMLAH 5,609,895.55
HIT-16 c Membuat 1 m3 Plat beton bertulang tb 10,cm, Lantai (45 kg besi + bekisting) lisplang
Bekisting 2 x Pakai m2 1.2500 440,084.25 550,105.31
Plastik m2 10.0000 12,500.00 125,000.00
Besi U.24 rata-rata Kg 45.0000 11,820.95 531,942.62
Membuat 1 m3 beton mutu (K225) m3 1.0000 1,205,258.59 1,205,258.59
JUMLAH 2,412,306.52
E. ANALISA HARGA SATUAN PEKERJAAN BETON

Analisa Harga Satuan Pekerjaan Dinding


Sesuai SNI 7395:2008
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH

E-06 Memasang 1 M2 Bata Merah tebal 1/2 Bata, 1pc : 5ps


Bata Merah buah 70.0000 896.34 62,743.53
Semen Portland kg 9.6800 1,800.00 17,424.00
Pasir pasang M3 0.0450 317,260.95 14,276.74
Pekerja Oh 0.3200 78,000.00 24,960.00
Tukang Batu Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0150 160,000.00 2,400.00
JUMLAH 133,744.27
F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN

Analisa Harga Satuan Pekerjaan Plesteran


Sesuai SNI 2837:2008
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH
F-05 Membuat 1 m2 Plesteran 1 PC : 5 PP, tebal 15 mm
Semen Portland kg 5.1840 1,800.00 9,331.20
Pasir Pasang m3 0.0260 317,260.95 8,248.78
Pekerja Oh 0.3000 78,000.00 23,400.00
Tukang Batu Oh 0.1500 107,000.00 16,050.00
Kepala Tukang Oh 0.0150 124,000.00 1,860.00
Mandor Oh 0.0150 160,000.00 2,400.00
Jumlah 61,289.98
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH
F-26 Membuat 1 m2 Finishing siar pasangan dinding batu kali adukan 1 PC : 2 PP
Semen portland kg 6.3400 1,800.00 11,412.00
Pasir pasang m3 0.0120 317,260.95 3,807.13
Pekerja Oh 0.3000 78,000.00 23,400.00
Tukang Batu Oh 0.1500 107,000.00 16,050.00
Kepala Tukang Oh 0.0150 124,000.00 1,860.00
Mandor Oh 0.0150 160,000.00 2,400.00
Jumlah 58,929.13
F-27 Membuat 1 m2 Acian
Semen portland kg 3.2500 1,800.00 5,850.00
Pekerja Oh 0.2000 78,000.00 15,600.00
Tukang Batu Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0100 160,000.00 1,600.00
Jumlah 34,990.00
G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP

Analisa Harga Satuan Pekerjaan Penutup Atap


Sesuai SNI 2011
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH

G - 01. 1 M2 Pasang Atap genteng palentong


Genteng Palentong buah 25.0000 1,700.08 42,501.94
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang Kayu Oh 0.0750 107,000.00 8,025.00
Kepala Tukang Oh 0.0080 124,000.00 992.00
Mandor Oh 0.0080 160,000.00 1,280.00
JUMLAH 64,498.94
G - 02. 1 M' Pasang Genteng Bubung Palentong
Genteng bubung palentong buah 5.0000 7,738.07 38,690.34
Semen Portland kg 8.0000 1,800.00 14,400.00
Pasir Pasang m3 0.0320 227,641.34 7,284.52
Pekerja Oh 0.4000 78,000.00 31,200.00
Tukang Kayu Oh 0.2000 107,000.00 21,400.00
Kepala Tukang Oh 0.0200 124,000.00 2,480.00
Mandor Oh 0.0020 160,000.00 320.00
JUMLAH 115,774.86
G - 03. 1 M2 Pasang Atap Genteng Murando Natural
Genteng Murando Natural buah 18.0000 9,279.10 167,023.83
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang batu Oh 0.0750 107,000.00 8,025.00
Kepala Tukang Oh 0.0080 124,000.00 992.00
Mandor Oh 0.0080 160,000.00 1,280.00
JUMLAH 189,020.83
G - 04. 1 M2 Pasang Nok Genteng Murando natural
Genteng nok Murando Natural bh 5.0000 10,059.49 50,297.45
Semen Portland kg 8.0000 1,800.00 14,400.00
Pasir Pasang m3 0.0320 9,279.10 296.93
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang batu Oh 0.0750 107,000.00 8,025.00
Kepala Tukang Oh 0.0080 124,000.00 992.00
Mandor Oh 0.0080 160,000.00 1,280.00
JUMLAH 86,991.38
G - 05. 1 M2 Pasang Atap Genteng Murando Glazur.
Genteng Murando Glazur buah 18.0000 10,059.49 181,070.80
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang batu Oh 0.0750 107,000.00 8,025.00
Kepala Tukang Oh 0.0080 124,000.00 992.00
Mandor Oh 0.0080 160,000.00 1,280.00
JUMLAH 203,067.80
G - 06. 1 M2 Pasang Nok Genteng Murando Glazur
Genteng nok Murando glazur bh 5.0000 12,767.82 63,839.11
Semen Portland kg 8.0000 1,800.00 14,400.00
Pasir Pasang m3 0.0320 227,641.34 7,284.52
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang batu Oh 0.0750 107,000.00 8,025.00
Kepala Tukang Oh 0.0080 124,000.00 992.00
Mandor Oh 0.0080 160,000.00 1,280.00
JUMLAH 107,520.63
G - 07. 1 M' Pasang Nok Genteng tepi morando
Nok Genteng morando buah 5.0000 10,059.49 50,297.45
Paku biasa 8 - 15 cm Kg 0.0500 18,571.37 928.57
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang kayu Oh 0.1500 107,000.00 16,050.00
Kepala Tukang Oh 0.0150 124,000.00 1,860.00
Mandor Oh 0.0130 160,000.00 2,080.00
JUMLAH 90,716.01
G - 08. 1 M2 Pasang Atap Genteng Metal
Genteng metal M2 1.0000 89,761.64 89,761.64
Paku biasa 2" - 5" Kg 0.2000 23,988.03 4,797.61
Pekerja Oh 0.2000 78,000.00 15,600.00
Tukang kayu Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0010 160,000.00 160.00
JUMLAH 122,259.24
G - 09. 1 M' Pasang Nok Genteng Metal
Nok Genteng Metal Lbr 1.0000 75,012.99 75,012.99
Paku biasa 1/2" - 1" Kg 0.0500 23,988.03 1,199.40
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Kayu Oh 0.1500 107,000.00 16,050.00
Kepala Tukang Oh 0.0150 124,000.00 1,860.00
Mandor Oh 0.0130 160,000.00 2,080.00
JUMLAH 115,702.39

Penutup Atap - Hal 71


H. ANALISA HARGA SATUAN PEKERJAAN PLAFOND

Analisa Harga Satuan Pekerjaan Plafond


Sesuai SNI 2011
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH

H-01 1 M2 Plafond Asbes (1,00 x 1,00) m, tebal 4 mm


Pelat Asbes tebal 4 mm lbr 1.1000 30,952.29 34,047.52
Paku seng Kg 0.0100 19,742.78 197.43
Pekerja Oh 0.0300 78,000.00 2,340.00
Tukang Kayu Oh 0.0700 107,000.00 7,490.00
Kepala Tukang Oh 0.0070 124,000.00 868.00
Mandor Oh 0.0015 160,000.00 240.00
JUMLAH 45,182.95
H-02 1 M2 Plafond Asbes (1,00 x 1,00) m, tebal 3,5 mm
Pelat asbes tebal 3,5 mm Lbr 1.1000 24,761.83 27,238.01
Paku seng Kg 0.0100 19,742.78 197.43
Pekerja Oh 0.0300 78,000.00 2,340.00
Tukang Kayu Oh 0.0700 107,000.00 7,490.00
Kepala Tukang Oh 0.0070 124,000.00 868.00
Mandor Oh 0.0015 160,000.00 240.00
JUMLAH 38,373.44
H-03 1 M2 Plafond Triplek 4 mm + Rangka Kayu Kelas II
Kayu Balok Kelas II M3 0.0230 2,742,052.50 63,067.21
Paku Biasa 2" - 5" Kg 0.0600 23,988.03 1,439.28
Triplek (120 x 240 x 0,4) cm Lbr 0.3900 93,114.81 36,314.77
Pekerja Oh 0.2700 78,000.00 21,060.00
Tukang Kayu Oh 0.4000 107,000.00 42,800.00
Kepala Tukang Oh 0.0400 124,000.00 4,960.00
Mandor Oh 0.0135 160,000.00 2,160.00
JUMLAH 171,801.26
H-04 1 M2 Plafond Gypsum Board, tebal 9 mm + Rangka Besi Hollow
Hollow 4/4 btg 0.4150 40,237.98 16,698.76
Hollow 2/4 btg 0.1500 17,023.76 2,553.56
Gypsum board (120 x 240 x 9) mm Lbr 0.3640 96,725.90 35,208.23
Paku Gypsum Kg 0.1100 38,690.36 4,255.94
Ramset/Dina Bolt buah 4.0000 4,642.84 18,571.37
Cotton Plaster buah 0.0720 15,476.15 1,114.28
Compoun Zak 0.1250 131,547.23 16,443.40
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang Kayu Oh 0.0500 107,000.00 5,350.00
Kepala Tukang Oh 0.0050 124,000.00 620.00
Mandor Oh 0.0050 160,000.00 800.00
JUMLAH 109,415.55
H-05 1 M2 Langit-langit GRC t = 4 mm + Rangka Besi Hollow
Hollow 4/4 btg 0.4150 40,237.98 16,698.76
Hollow 2/4 btg 0.1500 17,023.76 2,553.56
GRC (120 x 240 x 4) mm Lbr 0.3640 79,702.15 29,011.58
Paku GRC Kg 0.1100 40,237.98 4,426.18
Ramset/Dina Bolt buah 4.0000 4,642.84 18,571.37
Cotton Plaster buah 0.0720 15,476.15 1,114.28
Compoun Zak 0.1250 131,547.23 16,443.40
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang Kayu Oh 0.0500 107,000.00 5,350.00
Kepala Tukang Oh 0.0050 124,000.00 620.00
Mandor Oh 0.0050 160,000.00 800.00
JUMLAH 103,389.14

Plafond - Hal 72
H-06 1 M2 Langit-langit Gypsum t = 9 mm + Rangka Kayu Borneo Super
Kayu Balok Klas II m3 0.0230 2,742,052.50 63,067.21
Paku Biasa 2" - 5" Kg 0.0600 23,988.03 1,439.28
Gypsum board (120 x 240 x 9) mm Lbr 0.3900 96,725.90 37,723.10
Paku Sekrup Kg 0.1100 14,258.67 1,568.45
Pekerja Oh 0.2700 78,000.00 21,060.00
Tukang Kayu Oh 0.4000 107,000.00 42,800.00
Kepala Tukang Oh 0.0400 124,000.00 4,960.00
Mandor Oh 0.0135 160,000.00 2,160.00
JUMLAH 174,778.04
H-07 1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu
Kayu Balok Klas II m3 0.0230 2,742,052.50 63,067.21
Paku Biasa 4 cm - 7 cm Kg 0.0600 18,571.37 1,114.28
GRC (120 x 240 x 4) mm Lbr 0.3900 79,702.15 31,083.84
Paku GRC Kg 0.1100 40,237.98 4,426.18
Pekerja Oh 0.2700 78,000.00 21,060.00
Tukang kayu Oh 0.4000 107,000.00 42,800.00
Kepala Tukang Oh 0.0400 124,000.00 4,960.00
Mandor Oh 0.0135 160,000.00 2,160.00
JUMLAH 170,671.50
H-08 1 M' List Plafond Kayu 1/4 Cm.
List Kayu 1/4 m' 1.0500 5,940.00 6,237.00
Paku Biasa 1 cm - 3 cm Kg 0.0100 23,988.03 239.88
Pekerja Oh 0.0500 78,000.00 3,900.00
Tukang Kayu Oh 0.0500 107,000.00 5,350.00
Kepala Tukang Oh 0.0050 124,000.00 620.00
Mandor Oh 0.0030 160,000.00 480.00
JUMLAH 16,826.88
H- 09 1 M' List Plafond Kayu Profil 4 cm
List Kayu Profil m' 1.0500 16,378.92 17,197.87
Paku Kg 0.0100 18,571.37 185.71
Pekerja Oh 0.0500 78,000.00 3,900.00
Tukang Kayu Oh 0.0500 107,000.00 5,350.00
Kepala Tukang Oh 0.0050 124,000.00 620.00
Mandor Oh 0.0030 160,000.00 480.00
JUMLAH 27,733.58
H -10 1 M' List Langit-langit Gypsum 10 cm
List gypsum m' 1.0500 6,190.46 6,499.98
Tepung gypsum Kg 0.1500 77,380.73 11,607.11
Pekerja Oh 0.0500 78,000.00 3,900.00
Tukang Kayu Oh 0.0500 107,000.00 5,350.00
Kepala Tukang Oh 0.0050 124,000.00 620.00
Mandor Oh 0.0030 160,000.00 480.00
JUMLAH 28,457.09
H -11 1 M' Lisplang uk 2/10 + 2/15 cm, GRC tebal 8 mm.
GRC lbr 0.3400 79,702.15 27,098.73
Kaso 4/6 m3 0.0030 5,432,350.00 16,297.05
Paku Biasa ½" - 1" Kg 0.3000 18,571.37 5,571.41
Pekerja Oh 0.1100 78,000.00 8,580.00
Tukang Kayu Oh 0.2200 107,000.00 23,540.00
Kepala Tukang Oh 0.0220 124,000.00 2,728.00
Mandor Oh 0.0050 160,000.00 800.00
JUMLAH 84,615.19

Plafond - Hal 73
I. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI

Analisa Harga Satuan Pekerjaan Penutup Lantai


Sesuai SNI 7395:2008
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH

I - 01 Memasang 1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia


Keramik corak 20 x 20 cm buah 26.5000 3,095.23 82,023.47
Semen Portland kg 10.4000 1,800.00 18,720.00
Pasir Pasang M3 0.0450 317,260.95 14,276.74
semen Warna kg 1.6200 14,960.28 24,235.65
Pekerja Oh 0.2600 78,000.00 20,280.00
Tukang Batu Oh 0.1300 107,000.00 13,910.00
Kepala Tukang Oh 0.0130 124,000.00 1,612.00
Mandor Oh 0.0130 160,000.00 2,080.00
Jumlah 177,137.86
I - 02 Memasang 1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
Keramik polos 30 x 30 cm buah 11.8700 6,401.50 75,985.79
Semen Portland kg 10.0000 1,800.00 18,000.00
Pasir Pasang M3 0.0450 317,260.95 14,276.74
semen Warna kg 1.5000 14,960.28 22,440.41
Pekerja Oh 0.2600 78,000.00 20,280.00
Tukang Batu Oh 0.1300 107,000.00 13,910.00
Kepala Tukang Oh 0.0130 124,000.00 1,612.00
Mandor Oh 0.0130 160,000.00 2,080.00
Jumlah 168,584.94
I - 03 Memasang 1 M2 Lantai Keramik corak 30 x 30 cm setara Mulia
Keramik corak 30 x 30 cm buah 11.8700 8,300.84 98,531.01
Semen Portland kg 10.0000 1,800.00 18,000.00
Pasir Pasang M3 0.0450 317,260.95 14,276.74
semen Warna kg 1.5000 14,960.28 22,440.41
Pekerja Oh 0.2600 78,000.00 20,280.00
Tukang Batu Oh 0.1300 107,000.00 13,910.00
Kepala Tukang Oh 0.0130 124,000.00 1,612.00
Mandor Oh 0.0130 160,000.00 2,080.00
Jumlah 191,130.16
I - 04 Memasang 1 M2 Lantai Keramik corak 10 x 20 cm setara Roman
Keramik corak 10 x 20 cm buah 11.8700 2,890.80 34,313.80
Semen Portland kg 14.1500 1,800.00 25,470.00
Pasir Pasang M3 0.0390 317,260.95 12,373.18
semen Warna kg 2.0000 14,960.28 29,920.55
Pekerja Oh 0.7000 78,000.00 54,600.00
Tukang batu Oh 0.3500 107,000.00 37,450.00
Kepala Tukang Oh 0.0350 124,000.00 4,340.00
Mandor Oh 0.0350 160,000.00 5,600.00
Jumlah 204,067.53

Memasang 1 M2 Lantai Keramik corak 30 x 30 cm setara Roman


Keramik corak 30x30 cm roman kg 11.1100 7,365.42 81,829.84
Semen Portland M3 14.1500 1,800.00 25,470.00
Pasir Pasang kg 0.0390 317,260.95 12,373.18
semen Warna Oh 2.0000 14,960.28 29,920.55
Pekerja Oh 0.7000 78,000.00 54,600.00
Tukang batu Oh 0.3500 107,000.00 37,450.00
Kepala Tukang Oh 0.0350 124,000.00 4,340.00
Mandor Oh 0.0350 160,000.00 5,600.00
Jumlah 251,583.57

Memasang 1 M2 dinding Keramik corak 20 x 25 cm setara Roman


Keramik corak 30x30 cm roman M3 11.1100 4,431.79 49,237.20
Semen Portland kg 14.1500 1,800.00 25,470.00
Pasir Pasang Oh 0.0390 317,260.95 12,373.18
semen Warna Oh 2.0000 14,960.28 29,920.55
Pekerja Oh 0.7000 78,000.00 54,600.00
Tukang batu Oh 0.3500 107,000.00 37,450.00
Kepala Tukang Oh 0.0350 124,000.00 4,340.00
Mandor Oh 0.0350 160,000.00 5,600.00
Jumlah 218,990.93

Lantai - Hal 74
I - 05 1 M' Plint Keramik ukuran (10 x 40) cm
Plint Keramik buah 2.6500 3,095.23 8,202.36
Semen Portland kg 0.0200 1,800.00 36.00
Pasir Pasang M3 0.0030 317,260.95 951.78
semen Warna kg 0.1000 14,960.28 1,496.03
Pekerja Oh 0.0600 78,000.00 4,680.00
Tukang batu Oh 0.0300 107,000.00 3,210.00
Kepala Tukang Oh 0.0030 124,000.00 372.00
Mandor Oh 0.0030 160,000.00 480.00
Jumlah 19,428.17

1 M' Plint Keramik ukuran (10 x 25) cm


Plint Keramik buah 4.0000 18,159.57 72,638.28
Semen Portland kg 0.0200 1,800.00 36.00
Pasir Pasang M3 0.0030 317,260.95 951.78
semen Warna kg 0.1000 14,960.28 1,496.03
Pekerja Oh 0.0600 78,000.00 4,680.00
Tukang batu Oh 0.0300 107,000.00 3,210.00
Kepala Tukang Oh 0.0030 124,000.00 372.00
Mandor Oh 0.0030 160,000.00 480.00
Jumlah 83,864.09

I - 06 1 M' Plint Keramik ukuran (10 x 30) cm


Plint Keramik (10 x 30) cm buah 4.3000 2,133.83 9,175.48
Semen Portland zak 0.0500 1,800.00 90.00
Pasir Pasang M3 0.0032 317,260.95 1,015.24
semen Warna Kg 0.3000 14,960.28 4,488.08
Pekerja Oh 0.0600 78,000.00 4,680.00
Tukang batu Oh 0.0300 107,000.00 3,210.00
Kepala Tukang Oh 0.0030 124,000.00 372.00
Mandor Oh 0.0030 160,000.00 480.00
Jumlah 23,510.80
I - 07 1 M' Plint Keramik ukuran (10 x 20) cm
Plint Keramik buah 5.3000 2,133.83 11,309.31
Semen Portland kg 1.1400 1,800.00 2,052.00
Pasir Pasang m3 0.0030 317,260.95 951.78
semen Warna Kg 0.0250 14,960.28 374.01
Pekerja Oh 0.0900 78,000.00 7,020.00
Tukang batu Oh 0.0900 107,000.00 9,630.00
Kepala Tukang Oh 0.0090 124,000.00 1,116.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 33,253.10
I - 08 Memasang 1 m' plint keramik ukuran (10 x 10) cm
Plint keramik artistik buah 10.6000 -
Semen Portland kg 1.1400 1,800.00 2,052.00
Pasir Pasang m3 0.0030 317,260.95 951.78
semen Warna Kg 0.0500 14,960.28 748.01
Pekerja Oh 0.0900 78,000.00 7,020.00
Tukang batu Oh 0.0900 107,000.00 9,630.00
Kepala Tukang Oh 0.0090 124,000.00 1,116.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 22,317.80
I - 09 Memasang 1 m' Plint keramik ukuran (5 x 20) cm
Plint keramik buah 5.3000 -
Semen Portland kg 0.5700 1,800.00 1,026.00
Pasir Pasang m3 0.0015 317,260.95 475.89
semen Warna kg 0.0130 14,960.28 194.48

Lantai - Hal 75
Pekerja Oh 0.0900 78,000.00 7,020.00
Tukang batu Oh 0.0900 107,000.00 9,630.00
Kepala Tukang Oh 0.0090 124,000.00 1,116.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 20,262.38
I - 10 Memasang 1 m2 floor hardener
Floor hardener kg 5.0000 -
Pekerja Oh 0.1200 78,000.00 9,360.00
Tukang Batu Oh 0.1200 107,000.00 12,840.00
Kepala Tukang Oh 0.1200 124,000.00 14,880.00
Mandor Oh 0.0060 160,000.00 960.00
Jumlah 38,040.00
I - 11 Memasang 1 M2 Paving Block Natural 8 cm
Paving block natural M2 1.0100 113,520.59 114,655.80
Pasir pasang Kg 0.1000 317,260.95 31,726.10
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Batu Oh 0.5000 107,000.00 53,500.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 222,481.90
I - 12 Memasang 1 M2 Paving Block Warna 8 cm
Paving block warna M2 1.0100 133,030.49 134,360.80
Pasir pasang Kg 0.1000 317,260.95 31,726.10
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Batu Oh 0.5000 107,000.00 53,500.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 242,186.89
I - 13 Memasang 1 M2 Paving Block Natural 6 cm
Paving block natural M2 1.0100 107,043.33 108,113.77
Pasir pasang Kg 0.1000 317,260.95 31,726.10
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Batu Oh 0.5000 107,000.00 53,500.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 215,939.86
I - 14 Memasang 1 M2 Paving Block Warna 6 cm
Paving block warna M2 1.0100 123,035.35 124,265.70
Pasir pasang Kg 0.1000 317,260.95 31,726.10
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Batu Oh 0.5000 107,000.00 53,500.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0025 160,000.00 400.00
232,091.80
I - 15 Memasang 1 M2 Glass Block 20 x 20
Grass block buah 25.0000 21,279.29 531,982.28
Pasir pasang Kg 0.1000 317,260.95 31,726.10
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Batu Oh 0.5000 107,000.00 53,500.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 639,808.37
I - 16 Memasang 1 M2 Glass Block 30 x 30
Grass block buah 12.2500 24,724.95 302,880.67
Pasir pasang Kg 0.1000 317,260.95 31,726.10
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Batu Oh 0.5000 107,000.00 53,500.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 410,706.77
I - 17 Pekerjaan bekisting untuk Lantai bahan Bondex
Plat bondex m2 1.0300 138,600.00 142,758.00
Kayu Kelas II m3 0.0400 2,851,734.60 114,069.38
Paku 5 - 12 cm kg 0.1000 18,571.37 1,857.14
Minyak Bekisting liter 0.0500 50,117.52 2,505.88
Multiplek tebal 9 mm Lbr 0.0900 213,570.79 19,221.37
Dolken kayu galam (8-10) cm, pjng 4 m btg 1.5000 24,130.06 36,195.09
Pekerja Oh 0.1700 78,000.00 13,260.00
Tukang kayu Oh 0.0800 107,000.00 8,560.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0100 160,000.00 1,600.00
JUMLAH 341,266.86
I - 18 Memasang 1 M2 Lantai keramik setara mulia ukuran 40 x 40 cm
keramik 40 x 40 cm buah 6.6300 12,380.92 82,085.50
Semen Portland kg 9.8000 1,800.00 17,640.00
Pasir Pasang M3 0.0450 317,260.95 14,276.74
Semen Warna Kg 1.3000 14,960.28 19,448.36
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Batu Oh 0.1250 107,000.00 13,375.00
Kepala Tukang Oh 0.0130 124,000.00 1,612.00
Mandor Oh 0.0130 160,000.00 2,080.00
JUMLAH 170,017.60

Lantai - Hal 76
J. ANALISA HARGA SATUAN PEKERJAAN KAYU

Analisa Harga Satuan Pekerjaan Kayu


Sesuai SNI 3434:2008
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH
J-01 Memasang dan membuat 1 m3 Kusen Pintu & Jendela Kayu kelas 1
Balok kayu m3 1.1000 3,290,463.00 3,619,509.30
Paku 10 cm kg 1.2500 18,571.37 23,214.21
Lem kayu kg 1.0000 44,880.82 44,880.82
Pekerja Oh 7.0000 78,000.00 546,000.00
Tukang Kayu Oh 21.0000 107,000.00 2,247,000.00
Kepala Tukang Oh 2.1000 124,000.00 260,400.00
Mandor Oh 0.3500 160,000.00 56,000.00
Jumlah 6,797,004.33
J-02 Membuat dan memasang 1 m3 Kusen Pintu & Jendela Kayu kelas II atau kelas III
Balok kayu m3 1.2000 3,290,463.00 3,948,555.60
Paku 10 cm kg 1.2500 18,571.37 23,214.21
Lem kayu kg 1.0000 44,880.82 44,880.82
Pekerja Oh 6.0000 78,000.00 468,000.00
Tukang Kayu Oh 18.0000 107,000.00 1,926,000.00
Kepala Tukang Oh 1.8000 124,000.00 223,200.00
Mandor Oh 0.3000 160,000.00 48,000.00
Jumlah 6,681,850.63
J-03 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II
Papan kayu m3 0.0400 2,851,734.60 114,069.38
Paku 5 -7 cm kg 0.0500 18,571.37 928.57
Pekerja Oh 0.3500 78,000.00 27,300.00
Tukang Kayu Oh 1.0500 107,000.00 112,350.00
Kepala Tukang Oh 0.1050 124,000.00 13,020.00
Mandor Oh 0.0180 160,000.00 2,880.00
Jumlah 270,547.95
J-04 Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III untuk gudang sementara
Papan kayu m3 0.0400 2,851,734.60 114,069.38
Paku 5 - 7 cm Kg 0.0500 18,571.37 928.57
Pekerja Oh 0.3500 78,000.00 27,300.00
Tukang Kayu Oh 1.0500 107,000.00 112,350.00
Kepala Tukang Oh 0.1050 124,000.00 13,020.00
Mandor Oh 0.0180 160,000.00 2,880.00
Jumlah 270,547.95
J-05 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II
Papan kayu Kelas II m3 0.0400 2,851,734.60 114,069.38
Lem kayu Kg 0.5000 44,880.82 22,440.41
Pekerja Oh 1.0000 78,000.00 78,000.00
Tukang Kayu Oh 3.0000 107,000.00 321,000.00
Kepala Tukang Oh 0.3000 124,000.00 37,200.00
Mandor Oh 0.0500 160,000.00 8,000.00
Jumlah 580,709.79
J-06 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Papan kayu Kelas II m3 0.0240 2,851,734.60 68,441.63
Lem kayu kg 0.3000 44,880.82 13,464.25
Pekerja Oh 0.8000 78,000.00 62,400.00
Tukang Kayu Oh 2.4000 107,000.00 256,800.00
Kepala Tukang Oh 0.2400 124,000.00 29,760.00
Mandor Oh 0.0400 160,000.00 6,400.00
Jumlah 437,265.88
J-07 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II
Papan kayu m3 0.0640 2,851,734.60 182,511.01
Lem kayu kg 0.5000 44,880.82 22,440.41
Pekerja Oh 1.0000 78,000.00 78,000.00
Tukang Kayu Oh 3.0000 107,000.00 321,000.00
Kepala Tukang Oh 0.3000 124,000.00 37,200.00
Mandor Oh 0.0500 160,000.00 8,000.00
Jumlah 649,151.42
J-08 Membuat 1 m2 pintu panel Multiplek tb 9mm, rangka kayu kelas II
Papan kayu klas II m3 0.0230 2,851,734.60 65,589.90
paku 1 - 3 cm kg 0.3000 23,988.03 7,196.41
Lem kayu kg 0.1500 44,880.82 6,732.12
Multiplek tb 9 mm lbr 0.2300 213,570.79 49,121.28
Pekerja Oh 0.6000 78,000.00 46,800.00
Tukang Kayu Oh 2.0000 107,000.00 214,000.00
Kepala Tukang Oh 0.2000 124,000.00 24,800.00
Mandor Oh 0.0500 160,000.00 8,000.00
JUMLAH 422,239.71
J-09 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
Papan kayu m3 0.0256 2,851,734.60 73,004.41
paku 1 - 2,5 cm Kg 0.0300 23,988.03 719.64
Lem Kayu Kg 0.5000 44,880.82 22,440.41
Multiplek tb 9 mm Lbr 1.0000 213,570.79 213,570.79
Pekerja Oh 0.8000 78,000.00 62,400.00
Tukang Kayu Oh 2.4000 107,000.00 256,800.00
Kepala Tukang Oh 0.2400 124,000.00 29,760.00
Mandor Oh 0.0400 160,000.00 6,400.00
Jumlah 665,095.25
J-10 Memasang 1 m2 jalusi kusen, kayu kelas I atau II
Papan kayu m3 0.0600 2,851,734.60 171,104.08
paku 1 - 2,5 cm kg 0.1500 23,988.03 3,598.20
Pekerja Oh 0.6700 78,000.00 52,260.00
Tukang Kayu Oh 2.0000 107,000.00 214,000.00
Kepala Tukang Oh 0.2000 124,000.00 24,800.00
Mandor Oh 0.3350 160,000.00 53,600.00
Jumlah 519,362.28
J-11 Memasang 1 m2 teakwood rangkap, rangka expose kayu kelas I
Papan kayu m3 0.0250 2,851,734.60 71,293.37
Paku 1 - 2,5 cm Kg 0.0300 23,988.03 719.64
Lem Kayu Ltr 0.3000 44,880.82 13,464.25
Teakwood tebal 4 mm uk (90 x 220) cm Lbr 1.0000 259,059.05 259,059.05
Pekerja Oh 0.8000 78,000.00 62,400.00
Tukang kayu Oh 2.4000 107,000.00 256,800.00
Kepala Tukang Oh 0.2400 124,000.00 29,760.00
Mandor Oh 0.0400 160,000.00 6,400.00
Jumlah 614,419.05
J-12 Memasang 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Papan kayu m3 0.0250 2,851,734.60 71,293.37
Paku 1 - 2,5 cm Kg 0.0300 23,988.03 719.64
Lem kayu Ltr 0.8000 44,880.82 35,904.65
Teakwood tebal 4 mm uk (90 x 220) cm Lbr 1.0000 259,059.05 259,059.05
Formika lbr 0.5000 249,165.92 124,582.96
Pekerja Oh 0.8500 78,000.00 66,300.00
Tukang Kayu Oh 2.5500 107,000.00 272,850.00
Kepala Tukang Oh 0.2550 124,000.00 31,620.00
Mandor Oh 0.0430 160,000.00 6,880.00
Jumlah 869,209.67
J-13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Balok kayu m3 1.1000 3,290,463.00 3,619,509.30
Besi strip tebal 5 mm kg 15.0000 60,893.99 913,409.84
Paku 12 cm kg 5.6000 18,571.37 103,999.67
Pekerja Oh 4.0000 78,000.00 312,000.00
Tukang Kayu Oh 12.0000 107,000.00 1,284,000.00
Kepala Tukang Oh 1.2000 124,000.00 148,800.00
Mandor Oh 0.2000 160,000.00 32,000.00
Jumlah 6,413,718.81
J-14 Memasang 1 m3 konstruksi kuda-kuda expose, kayu kelas I
Balok kayu m3 1.2000 3,290,463.00 3,948,555.60
Besi strip tebal 5 mm kg 15.0000 60,893.99 913,409.84
paku 12 cm kg 5.6000 18,571.37 103,999.67
Pekerja Oh 6.7000 78,000.00 522,600.00
Tukang Kayu Oh 20.1000 107,000.00 2,150,700.00
Kepala Tukang Oh 2.0100 124,000.00 249,240.00
Mandor Oh 0.3350 160,000.00 53,600.00
Jumlah 7,942,105.11
J-15 Memasang 1 m3 konstruksi, gording kayu kelas II
Balok kayu m3 1.1000 3,290,463.00 3,619,509.30
Besi strip tebal 5 mm kg 15.0000 60,893.99 913,409.84
Paku 12 cm kg 3.0000 18,571.37 55,714.11
Pekerja Oh 2.4000 78,000.00 187,200.00
Tukang Kayu Oh 7.2000 107,000.00 770,400.00
Kepala Tukang Oh 0.7200 124,000.00 89,280.00
Mandor Oh 0.1200 160,000.00 19,200.00
Jumlah 5,654,713.25
J-16 Memasang 1 m2 rangka atap genteng keramik, kayu kelas II
kaso-kaso (5 x 7) cm m3 0.0140 5,416,650.51 75,833.11
reng (2 x 3) cm m' 0.0036 24,130.06 86.87
Paku 5 dan 10 cm kg 0.2500 18,571.37 4,642.84
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang Kayu Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 101,102.82
J-17 Memasang 1 m2 rangka atap genteng beton, kayu kelas II
kaso-kaso (5 x 7) cm m3 0.0140 5,416,650.51 75,833.11
reng (2 x 3) cm m' 0.0072 24,130.06 173.74
Paku 5 dan 10 cm kg 0.2500 18,571.37 4,642.84
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang Kayu Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 101,189.69
J-18 Memasang 1 m2 rangka atap sirap, kayu kelas II
Balok kayu m3 0.1650 3,290,463.00 542,926.40
paku 5 - 10 cm kg 0.2000 18,571.37 3,714.27
Pekerja Oh 0.1200 78,000.00 9,360.00
Tukang Kayu Oh 0.1200 107,000.00 12,840.00
Kepala Tukang Oh 0.0120 124,000.00 1,488.00
Mandor Oh 0.0060 160,000.00 960.00
Jumlah 571,288.67
J-19 Memasang 1 m2 rangka plafond (50 x 100) cm, kayu kelas II atau kelas III
Kaso-kaso (5 x 7) cm m3 0.0154 5,416,650.51 83,416.42
Paku 7 - 10 cm kg 0.2000 18,571.37 3,714.27
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang Kayu Oh 0.3000 107,000.00 32,100.00
Kepala Tukang Oh 0.0300 124,000.00 3,720.00
Mandor Oh 0.0750 160,000.00 12,000.00
Jumlah 146,650.69
J-20 Memasang 1 m2 rangka plafond (60 x 60), kayu kelas II atau kelas III
Kaso-kaso (5 x 7) cm m3 0.0163 5,416,650.51 88,291.40
Paku 7 - 10 cm kg 0.2500 18,571.37 4,642.84
Pekerja Oh 0.2000 78,000.00 15,600.00
Tukang Kayu Oh 0.3000 107,000.00 32,100.00
Kepala Tukang Oh 0.0300 124,000.00 3,720.00
Mandor Oh 0.0100 160,000.00 1,600.00
Jumlah 145,954.25
J-21 Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Papan kayu m3 0.0108 2,851,734.60 30,798.73
paku 5 cm dan 7 cm kg 0.1000 18,571.37 1,857.14
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang Kayu Oh 0.2000 107,000.00 21,400.00
Kepala Tukang Oh 0.0200 124,000.00 2,480.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 65,135.87
J-22 Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Papan kayu m3 0.0110 2,851,734.60 31,369.08
paku 5 cm dan 7 cm kg 0.0500 18,571.37 928.57
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang Kayu Oh 0.2000 107,000.00 21,400.00
Kepala Tukang Oh 0.0200 124,000.00 2,480.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 64,777.65
J-23 Memasang 1 m2 rangka dinding pemisah ( 60 x 120) cm, kayu kelas II atau III
Balok kayu M3 0.0280 3,290,463.00 92,132.96
paku 5 cm dan 7 cm Lbr 0.1500 18,571.37 2,785.71
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang Kayu Oh 0.4500 107,000.00 48,150.00
Kepala Tukang Oh 0.0450 124,000.00 5,580.00
Mandor Oh 0.0080 160,000.00 1,280.00
Jumlah 161,628.67
J-24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
balok kayu m3 0.0280 3,290,463.00 92,132.96
paku 5 cm dan 10 cm kg 0.1500 18,571.37 2,785.71
Teakwood tebal 4 mm uk (120 x 240) cm lbr 0.8600 259,059.05 222,790.78
Lem kayu kg 0.5600 44,880.82 25,133.26
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang Kayu Oh 0.4500 107,000.00 48,150.00
Kepala Tukang Oh 0.0450 124,000.00 5,580.00
Mandor Oh 0.0080 160,000.00 1,280.00
Jumlah 409,552.71
J-25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II
balok kayu m3 0.0280 3,290,463.00 92,132.96
paku 5 cm dan 10 cm kg 0.1500 18,571.37 2,785.71
Plywood tebal 4 mm uk (120 x 240) cm lbr 0.8600 259,059.05 222,790.78
Lem kayu kg 0.5600 44,880.82 25,133.26
Pekerja Oh 0.2000 78,000.00 15,600.00
Tukang Kayu Oh 0.6000 107,000.00 64,200.00
Kepala Tukang Oh 0.0600 124,000.00 7,440.00
Mandor Oh 0.0100 160,000.00 1,600.00
Jumlah 431,682.71
J-26 Memasang 1 m2 dinding lambrizing dari papan kayu kelas I
Papan kayu m3 0.0070 2,851,734.60 19,962.14
paku 5 cm dan 10 cm kg 0.1000 18,571.37 1,857.14
Paku sekrup kg 0.1500 1,160.72 174.11
Pekerja Oh 0.6000 78,000.00 46,800.00
Tukang Kayu Oh 1.8000 107,000.00 192,600.00
Kepala Tukang Oh 0.1800 124,000.00 22,320.00
Mandor Oh 0.0300 160,000.00 4,800.00
Jumlah 288,513.39
J-27 Memasang 1 m2 dinding lambrizing dari plywood ukuran (120 x 240) cm
Plywood tebal 4 mm lbr 0.4000 259,059.05 103,623.62
paku 1 - 2,5 cm kg 0.0500 23,988.03 1,199.40
Pekerja Oh 0.0250 78,000.00 1,950.00
Tukang Kayu Oh 0.0750 107,000.00 8,025.00
Kepala Tukang Oh 0.0080 124,000.00 992.00
Mandor Oh 0.0010 160,000.00 160.00
Jumlah 115,950.02
J-28 Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV
Bilik Bambu m2 1.5000 27,857.06 41,785.58
Kaso-kaso (5 x 7) cm m3 0.0140 5,416,650.51 75,833.11
Paku kg 0.0120 18,571.37 222.86
List Kayu m3 0.0030 55,900.00 167.70
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang Kayu Oh 0.0500 107,000.00 5,350.00
Kepala Tukang Oh 0.0050 124,000.00 620.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 132,579.25
J-08-HI
Membuat dan memasang daun pintu kayu lapis triplek rangkap lapis formika, rangka tertutup kayu kelas II

Papan kayu m3 0.0250 2,851,734.60 71,293.37


paku 1 -2,5 cm kg 0.0300 18,571.37 557.14
Lem kayu kg 0.5000 44,880.82 22,440.41
Triplek tebal 4 mm uk (90 x 220) cm lbr 1.0000 93,114.81 93,114.81
List Kayu m3 0.7000 55,900.00 39,130.00
Pek Kayu - Hal 77
Formika lbr 0.5000 249,165.92 124,582.96
Pekerja Oh 2.1000 78,000.00 163,800.00
Tukang Kayu Oh 0.2100 107,000.00 22,470.00
Kepala Tukang Oh 0.0350 124,000.00 4,340.00
Jumlah 541,728.68

Pek Kayu - Hal 78


K. ANALISA HARGA SATUAN PEKERJAAN PENUTUP BESI DAN ALUMINIUM

Analisa Harga Satuan Pekerjaan Penutup Besi dan Aluminium


Sesuai SNI DT-91-0914-2007
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH
K-01 Memasang 1 Kg Besi Profil
Besi Profil Kg 1.1500 9,549.46 10,981.88
Pekerja Oh 0.0600 78,000.00 4,680.00
Tukang besi Oh 0.0600 107,000.00 6,420.00
Kepala Tukang Oh 0.0060 124,000.00 744.00
Mandor Oh 0.0030 160,000.00 480.00
JUMLAH 23,305.88
K-02 Memasang 1 Kg Rangka kuda-kuda baja WF
Besi baja WF kg 1.1500 15,011.86 17,263.63
Pekerja Oh 0.0600 78,000.00 4,680.00
Tukang Las Oh 0.0600 107,000.00 6,420.00
Kepala Tukang Oh 0.0060 124,000.00 744.00
Mandor Oh 0.0030 160,000.00 480.00
JUMLAH 29,587.63
K-03 Mengerjakan 100 kg pekerjaan perakitan
Solar Ltr 1.0000 8,550.00 8,550.00
Minyak Pelumas Ltr 0.1000 58,803.20 5,880.32
Sewa Alat Jam 0.8000 66,000.00 52,800.00
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang Besi Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0010 124,000.00 124.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 86,654.32
K-04 Membuat 1 m2 Pintu besi plat tebal 2 mm rangkap rangka baja siku
Besi siku L 30.30.3 kg 15.0000 52,647.41 789,711.12
Besi Plat kg 32.8000 18,571.37 609,140.95
Kawat las kg 0.0500 42,559.40 2,127.97
Pekerja Oh 1.0500 78,000.00 81,900.00
Tukang Besi Oh 1.0500 107,000.00 112,350.00
Kepala Tukang Oh 0.1050 124,000.00 13,020.00
Mandor Oh 0.0520 160,000.00 8,320.00
Jumlah 1,616,570.04
K-05 Mengerjakan 10 cm pengelasan dengan las listrik
Kawat las kg 0.0400 42,559.40 1,702.38
Solar ltr 0.0300 8,550.00 256.50
Minyak pelumas ltr 0.0040 58,803.20 235.21
Sewa alat jam 0.0170 66,000.00 1,122.00
Pekerja Oh 0.6500 78,000.00 50,700.00
Tukang Besi Oh 0.6500 107,000.00 69,550.00
Kepala Tukang Oh 0.0650 124,000.00 8,060.00
Mandor Oh 0.0320 160,000.00 5,120.00
Jumlah 136,746.09
K-06 Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm
scuare tube m 4.7600 26,433.39 125,822.92
Besi lis kaca (1 x 1) xm m 4.5220 55,094.89 249,139.11
pengelasan cm 20.0000 3,838.87 76,777.47
Pekerja Oh 0.6500 78,000.00 50,700.00
Tukang las Oh 0.6500 107,000.00 69,550.00
Kepala Tukang Oh 0.0650 124,000.00 8,060.00
Mandor Oh 0.0320 160,000.00 5,120.00
Jumlah 585,169.50
K-07 Memasang 1 m2 pintu rolling door besi
pintu gulung besi m2 1.0000 655,499.83 655,499.83
Pekerja Oh 1.2000 78,000.00 93,600.00
Tukang besi Oh 1.2000 107,000.00 128,400.00
Kepala Tukang Oh 0.1200 124,000.00 14,880.00
Mandor Oh 0.0060 160,000.00 960.00
Jumlah 893,339.83

Besi - Hal 79
K-08 Memasang 1 m2 pintu lipat (folding door)
Pintu gulung besi m2 1.0000 655,499.83 655,499.83
Pekerja Oh 0.4400 78,000.00 34,320.00
Tukang besi Oh 0.4400 107,000.00 47,080.00
Kepala Tukang Oh 0.0440 124,000.00 5,456.00
Mandor Oh 0.0220 160,000.00 3,520.00
JUMLAH 745,875.83
K-09 Memasang 1 m2 sunscreen alluminium
sunscreen alluminium m2 1.0000 571,998.29 571,998.29
Pekerja Oh 0.0800 78,000.00 6,240.00
Tukang besi Oh 0.8000 107,000.00 85,600.00
Kepala Tukang Oh 0.0800 124,000.00 9,920.00
Mandor Oh 0.0040 160,000.00 640.00
Jumlah 674,398.29
K-10 Memasang 1 m2 rolling door alluminium
Rolling door alluminium m2 1.0000 499,094.05 499,094.05
Pekerja Oh 1.0000 78,000.00 78,000.00
Tukang besi Oh 1.0000 107,000.00 107,000.00
Kepala Tukang Oh 0.1000 124,000.00 12,400.00
Mandor Oh 0.0500 160,000.00 8,000.00
Jumlah 704,494.05
K-11 Memasang 1 m kusen pintu alluminium
Profil alluminium m 1.1000 28,004.08 30,804.49
Skrup Fixer buah 2.0000 1,547.62 3,095.24
Sealant tube 0.0600 195,564.60 11,733.88
Pekerja Oh 0.0430 78,000.00 3,354.00
Tukang besi Oh 0.0430 107,000.00 4,601.00
Kepala Tukang Oh 0.0043 124,000.00 533.20
Mandor Oh 0.0021 160,000.00 336.00
JUMLAH 54,457.80
K-12 Memasang 1 m2 pintu alluminium strip lebar 8 cm
Profil alluminium m 4.4000 28,004.08 123,217.95
alluminium strip m 14.6000 81,718.07 1,193,083.75
Pekerja Oh 0.0850 78,000.00 6,630.00
Tukang besi Oh 0.0850 107,000.00 9,095.00
Kepala Tukang Oh 0.0085 124,000.00 1,054.00
Mandor Oh 0.0042 160,000.00 672.00
JUMLAH 1,333,752.70
K-13 Memasang 1 m2 pintu kaca rangka alluminium
pintu alluminium m 4.4000 232,306.69 1,022,149.43
folding gate m2 4.5000 438,728.40 1,974,277.80
Sealant tube 0.2700 195,564.60 52,802.44
Pekerja Oh 0.0850 78,000.00 6,630.00
Tukang besi Oh 0.0850 107,000.00 9,095.00
Kepala Tukang Oh 0.0080 124,000.00 992.00
Mandor Oh 0.0040 160,000.00 640.00
JUMLAH 3,066,586.67
K-13.alt Memasang 1 m2 pintu kaca rangka alluminium
pintu alluminium m 4.4000 232,306.69 1,022,149.43
kaca polos tb 5 mm m2 4.5000 136,190.07 612,855.33
Sealant tube 0.2700 81,718.07 22,063.88
Pekerja tube 0.0850 78,000.00 6,630.00
Tukang Besi Oh 0.0850 107,000.00 9,095.00
Kepala Tukang Oh 0.0080 124,000.00 992.00
Mandor Oh 0.0040 160,000.00 640.00
JUMLAH 1,674,425.63
K-14 Memasang 1 m2 Tirai (Venetion blinds and vertikal blinds)
tirai m2 1.0000 591,030.00 591,030.00
Pekerja Oh 0.3500 78,000.00 27,300.00
Tukang besi Oh 0.3500 107,000.00 37,450.00
Kepala Tukang Oh 0.0350 124,000.00 4,340.00
Mandor Oh 0.0180 160,000.00 2,880.00
Jumlah 663,000.00
K-15 Memasang 1 m2 terali besi strip (2 x 3) mm
besi strip kg 6.1770 60,893.99 376,142.17
pengelasan cm 27.0800 3,838.87 103,956.69
Pekerja Oh 1.6700 78,000.00 130,260.00
Tukang besi Oh 1.6700 107,000.00 178,690.00
Kepala Tukang Oh 0.1670 124,000.00 20,708.00
Mandor Oh 0.0830 160,000.00 13,280.00
Besi - Hal 80
Jumlah 823,036.87

Besi - Hal 81
K-16 Memasang 1 m2 Kawat Harmonika
kawat harmonika m2 1.1000 42,559.40 46,815.34
pengelasan cm 11.1100 3,838.87 42,649.88
baja strip (0,2 x 2) cm kg 1.7160 24,565.29 42,154.03
Pekerja Oh 0.1000 78,000.00 7,800.00
Tukang besi Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 152,159.25
K-17 1 M2 Jendela Nako & Teralis (10 Klips)
Jendela Nako (rangka + kaca 5 mm) m2 1.1000 227,413.69 250,155.06
paku skrup buah 10.0000 14,300.00 143,000.00
Besi Strip kg 7.0000 60,893.99 426,257.92
Pekerja Oh 0.2000 78,000.00 15,600.00
Tukang besi Oh 0.2000 107,000.00 21,400.00
Kepala Tukang Oh 0.0200 124,000.00 2,480.00
Mandor Oh 0.0010 160,000.00 160.00
Jumlah 859,052.99
K-18 Memasang 1 m'Talang datar / jurai seng BJLS 28 lebar 90 cm
Seng plat m' 1.0500 35,595.13 37,374.89
Paku 1 - 2,5 cm Kg 0.0150 23,988.03 359.82
Papan kayu kls II m3 0.0190 2,851,734.60 54,182.96
Pekerja Oh 0.2000 78,000.00 15,600.00
Tukang Besi Oh 0.4000 107,000.00 42,800.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0100 160,000.00 1,600.00
JUMLAH 155,017.67
K-19 Memasang 1 m' talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cm
Seng plat m' 1.0500 35,595.13 37,374.89
paku 1 - 2,5 cm kg 0.0100 23,988.03 239.88
Besi strip kg 0.5000 60,893.99 30,446.99
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang Besi Oh 0.3000 107,000.00 32,100.00
Kepala Tukang Oh 0.0300 124,000.00 3,720.00
Mandor Oh 0.0070 160,000.00 1,120.00
Jumlah 116,701.76
K-20 Pemasangan 1 m2 Aluminium Composite Panel

Aluminium composite panel type PVDF 0.3 warna silver m2 1.0000 495,000.00 495,000.00

Srew buah 20.0000 385.00 7,700.00


Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang Besi Oh 0.0750 107,000.00 8,025.00
Kepala Tukang Oh 0.0080 124,000.00 992.00
Mandor Oh 0.0080 160,000.00 1,280.00
Jumlah 524,697.00

Besi - Hal 82
L. ANALISA HARGA SATUAN PEKERJAAN KUNCI DAN KACA

Analisa Harga Satuan Pekerjaan Kunci dan Kaca


Sesuai PT T-30-200-C
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH
L-01 Pasang 1 buah kunci tanam antik
Kunci Tanam Antik buah 1.0000 164,523.15 164,523.15
Tukang Kayu Oh 0.6000 107,000.00 64,200.00
Kepala Tukang Oh 0.0600 124,000.00 7,440.00
Jumlah 236,163.15
L-02 Pasang 1 buah Kunci Tanam Biasa
Kunci tanam biasa buah 1.0000 145,219.10 145,219.10
Tukang Kayu Oh 0.5000 107,000.00 53,500.00
Kepala Tukang Oh 0.0500 124,000.00 6,200.00
Jumlah 204,919.10
L-03 Pasang 1 buah Kunci Tanam Kamar Mandi
Kunci tanam kamar mandi buah 1.0000 69,648.13 69,648.13
Tukang Kayu Oh 0.2500 107,000.00 26,750.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Jumlah 99,498.13
L-04 Pasang 1 buah Engsel Pintu
Engsel Pintu buah 1.0000 16,452.32 16,452.32
Tukang Kayu Oh 0.1250 107,000.00 13,375.00
Kepala Tukang Oh 0.0130 124,000.00 1,612.00
Jumlah 31,439.32
L-05 Pasang 1 buah Engsel Pintu Klaim
Engsel pintu ps 1.0000 16,452.32 16,452.32
pembantu tukang Oh 0.2500 90,855.42 22,713.85
Tukang Kayu Oh 0.2500 107,000.00 26,750.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0130 160,000.00 2,080.00
Jumlah 69,016.17
L-06 Pasang 1 buah Kait Angin Pintu
Kait angin ps 1.0000 24,993.98 24,993.98
Tukang Kayu Oh 0.1250 107,000.00 13,375.00
Kepala Tukang Oh 0.0130 124,000.00 1,612.00
Jumlah 39,980.98
L-07 Pasang 1 buah Door Closer
Door closer unit 1.0000 708,807.41 708,807.41
Engsel ps 1.0000 16,452.32 16,452.32
Tukang Kayu Oh 0.2000 107,000.00 21,400.00
Kepala Tukang Oh 0.0200 124,000.00 2,480.00
Jumlah 749,139.72
L-08 Pasang 1 buah Door Holder
Door holder unit 1.0000 96,849.29 96,849.29
Tukang Kayu Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Jumlah 108,789.29
L-09 Pasang 1 buah Door Stoper
door stoper unit 1.0000 96,849.29 96,849.29
Tukang Kayu Oh 0.1250 107,000.00 13,375.00
Kepala Tukang Oh 0.0130 124,000.00 1,612.00
Jumlah 111,836.29
L-10 Pasang 1 buah Gerendel
gerendel 7 cm unit 1.1000 97,035.42 106,738.97
Tukang Kayu Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Jumlah 118,678.97
L-11 Memasang 1 m2 kaca polos tebal 2 mm
kaca polos m2 1.1000 118,476.97 130,324.66
Pekerja Oh 0.1600 78,000.00 12,480.00
Tukang Kaca Oh 0.1600 107,000.00 17,120.00
Kepala Tukang Oh 0.0160 124,000.00 1,984.00
Mandor Oh 0.0080 160,000.00 1,280.00
Jumlah 161,908.66
L-12 Memasang 1 m2 kaca polos tebal 3 mm
kaca polos m2 1.1000 118,476.97 130,324.66
Pekerja Oh 0.1600 78,000.00 12,480.00
Tukang Kaca Oh 0.1600 107,000.00 17,120.00

Kunci Kaca - Hal 83


Kepala Tukang Oh 0.0160 124,000.00 1,984.00
Mandor Oh 0.0080 160,000.00 1,280.00
Jumlah 161,908.66
L-13 Memasang 1 m2 kaca polos tebal 3 mm dengan kisi-kisi
kaca polos m2 1.2000 118,476.97 142,172.36
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Kaca Oh 0.2500 107,000.00 26,750.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0080 160,000.00 1,280.00
Jumlah 191,522.36
L-14 Memasang 1 m2 kaca raiben tebal 5 mm
kaca raiben m2 1.1000 186,252.00 204,877.20
Pekerja Oh 0.1600 78,000.00 12,480.00
Tukang Kaca Oh 0.1600 107,000.00 17,120.00
Kepala Tukang Oh 0.0160 124,000.00 1,984.00
Mandor Oh 0.0080 160,000.00 1,280.00
Jumlah 236,461.20
L-15 Memasang 1 m2 kaca raiben tebal 12 mm
kaca raiben m2 1.1000 931,260.00 1,024,386.00
Pekerja Oh 0.2500 78,000.00 19,500.00
Tukang Kaca Oh 0.1250 107,000.00 13,375.00
Kepala Tukang Oh 0.0130 124,000.00 1,612.00
Mandor Oh 0.0130 160,000.00 2,080.00
Jumlah 1,058,873.00
L-16 Memasang 1 m2 kaca es tebal 5 mm
kaca es m2 1.1000 252,784.40 278,062.84
Pekerja Oh 0.1600 78,000.00 12,480.00
Tukang Kaca Oh 0.1600 107,000.00 17,120.00
Kepala Tukang Oh 0.0160 124,000.00 1,984.00
Mandor Oh 0.0080 160,000.00 1,280.00
Jumlah 309,646.84
L-17 Memasang 1 m2 kaca lukis
kaca lukis m2 1.1000 152,283.55 167,511.90
Pekerja Oh 0.1600 78,000.00 12,480.00
Tukang Kaca Oh 0.1600 107,000.00 17,120.00
Kepala Tukang Oh 0.0160 124,000.00 1,984.00
Mandor Oh 0.0080 160,000.00 1,280.00
Jumlah 199,095.90

Kunci Kaca - Hal 84


M. ANALISA HARGA SATUAN PEKERJAAN SANITASI

Analisa Harga Satuan Pekerjaan Sanitasi


Sesuai RSNI T-15-2002
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH

M-01 Memasang 1 buah closet duduk


Closet duduk standar TOTO buah 1.0000 1,856,611.13 1,856,611.13
Perlengkapan (6%) lot 0.0600 1,856,611.13 111,396.67
Pekerja Oh 3.3000 78,000.00 257,400.00
Tukang batu Oh 1.1000 107,000.00 117,700.00
Kepala Tukang Oh 0.0110 124,000.00 1,364.00
Mandor Oh 0.1600 160,000.00 25,600.00
Jumlah 2,370,071.80
M-02 Memasang 1 buah closet jongkok
Closet jongkok Poslin warna TOTO buah 1.0000 280,774.89 280,774.89
Semen Portland kg 6.0000 1,800.00 10,800.00
Pasir pasang m3 0.0100 317,260.95 3,172.61
Pekerja Oh 1.0000 78,000.00 78,000.00
Tukang Batu Oh 1.5000 107,000.00 160,500.00
Kepala Tukang Oh 0.1500 124,000.00 18,600.00
Mandor Oh 0.1600 160,000.00 25,600.00
Jumlah 577,447.50
M-03 Memasang 1 buah Urinoir
urinoir lengkap TOTO buah 1.0000 3,000,824.38 3,000,824.38
Perlengkapan 30 % harga urinoir lot 0.3000 3,000,824.38 900,247.31
Semen portland kg 6.0000 1,800.00 10,800.00
Pasir pasang m3 0.0100 317,260.95 3,172.61
Pekerja Oh 1.0000 78,000.00 78,000.00
Tukang batu Oh 1.0000 107,000.00 107,000.00
Kepala Tukang Oh 0.1000 124,000.00 12,400.00
Mandor Oh 0.1000 160,000.00 16,000.00
Jumlah 4,128,444.31
M-04 Memasang 1 buah Wastafel
Wastafel lengkap TOTO buah 1.0000 1,457,852.79 1,457,852.79
Perlengkapan 12 % harga wastafel lot 0.1200 1,457,852.79 174,942.34
Semen portland kg 6.0000 1,800.00 10,800.00
Pasir pasang m3 0.0100 317,260.95 3,172.61
Pekerja Oh 1.2000 78,000.00 93,600.00
Tukang Batu Oh 1.4500 107,000.00 155,150.00
Kepala Tukang Oh 0.1500 124,000.00 18,600.00
Mandor Oh 0.1000 160,000.00 16,000.00
Jumlah 1,930,117.74
M-05 1 Buah bak Mandi Fibreglass Volume 0,30 m3
Bak Fibreglass 0.60 m x 0.60 m buah 1.0000 386,903.61 386,903.61
Pekerja Oh 1.8000 78,000.00 140,400.00
Tukang Batu Oh 2.7000 107,000.00 288,900.00
Kepala Tukang Oh 0.5400 124,000.00 66,960.00
Mandor Oh 0.1100 160,000.00 17,600.00
Perlengkapan 18% harga bak lot 0.1800 386,903.61 69,642.65
Jumlah 970,406.26
M-06 Memasang 1 buah bak mandi bata merah volume 0,3 m3
Bata merah m3 0.4000 1,080,000.00 432,000.00
Semen Portland kg 120.0000 1,800.00 216,000.00
Pasir pasang m3 0.3000 317,260.95 95,178.29
Semen Nat kg 6.0000 9,871.39 59,228.33
Pekerja Oh 6.0000 78,000.00 468,000.00
Tukang batu Oh 3.0000 107,000.00 321,000.00
Kepala tukang Oh 0.3000 124,000.00 37,200.00
Mandor Oh 0.3000 160,000.00 48,000.00
Jumlah 1,676,606.62
M-07 1 M' Saluran Air Limbah Buis Beton d = 30 cm - 60 cm
Buis beton θ30 cm buah 1.1000 102,179.92 112,397.91
Bata merah buah 25.0000 896.34 22,408.40
Semen portland kg 10.0000 1,800.00 18,000.00
Pasir pasang m3 0.0610 317,260.95 19,352.92
Pasir urug m3 0.0690 235,143.15 16,224.88
Pekerja Oh 0.3800 78,000.00 29,640.00
Tukang Batu Oh 0.1900 107,000.00 20,330.00

Sanitasi - Hal 85
Kepala Tukang Oh 0.0190 124,000.00 2,356.00
Mandor Oh 0.0190 160,000.00 3,040.00
Jumlah 243,750.11
M-08 Memasang 1 m pipa penyalur air limbah jenis pipa tanah
Pipa Tanah buah 1.6000 11,935.00 19,096.00
semen portland kg 0.6800 1,800.00 1,224.00
pasir pasang m3 0.0130 317,260.95 4,124.39
pasir urug m3 0.1100 235,143.15 25,865.75
pekerja Oh 0.0600 78,000.00 4,680.00
Tukang batu Oh 0.0300 107,000.00 3,210.00
Kepala tukang Oh 0.0030 124,000.00 372.00
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 58,972.14
M-09 Memasang 1 m3 pipa beton
pipa beton buah 1.1000 53,900.00 59,290.00
bata merah buah 0.0270 896.34 24.20
semen portland kg 3.9200 1,800.00 7,056.00
pasir pasang m3 0.0560 317,260.95 17,766.61
pasir urug m3 0.0240 235,143.15 5,643.44
Pekerja Oh 0.1400 78,000.00 10,920.00
Tukang batu Oh 0.0700 107,000.00 7,490.00
Kepala tukang Oh 0.0070 124,000.00 868.00
Mandor Oh 0.0070 160,000.00 1,120.00
Jumlah 110,178.25
M-10 1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
Bata merah buah 186.00 896.34 166,718.51
semen kg 110.00 1,800.00 198,000.00
Pasir pasang m3 0.1840 317,260.95 58,376.02
Batu pecah 2/3 m3 0.0330 382,518.70 12,623.12
Besi beton m3 4.8500 9,549.46 46,314.88
Pasir beton m3 0.1200 355,951.32 42,714.16
Pekerja Oh 2.1600 78,000.00 168,480.00
Tukang las Oh 0.7200 107,000.00 77,040.00
Kepala Tukang Oh 0.0720 124,000.00 8,928.00
Mandor Oh 0.1080 160,000.00 17,280.00
Tukang Gali Oh 0.1000 78,000.00 7,800.00
Jumlah 804,274.69
M-11 1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
Bata merah buah 53.0000 896.34 47,505.81
Semen kg 44.0000 1,800.00 79,200.00
Pasir pasang m3 0.0700 317,260.95 22,208.27
Batu pecah 2/3 m3 0.0700 382,518.70 26,776.31
Besi beton m3 1.6000 9,549.46 15,279.14
Pasir beton m3 0.0600 355,951.32 21,357.08
Pekerja Oh 3.2000 78,000.00 249,600.00
Tukang Batu Oh 1.0150 107,000.00 108,605.00
Kepala Tukang Oh 0.0015 124,000.00 186.00
Mandor Oh 0.0160 160,000.00 2,560.00
Jumlah 573,277.61
M-12 1 M' Pipa PVC θ 1/2" (AW)
Pipa PVC θ 1/2" (RUCIKA) m' 1.2000 10,476.68 12,572.01
Pekerja Oh 0.0360 78,000.00 2,808.00
Tukang Pipa Oh 0.0600 107,000.00 6,420.00
Kepala Tukang Oh 0.0060 124,000.00 744.00
Mandor Oh 0.0018 160,000.00 288.00
Perlengkapan 35% harga pipa lot 0.3500 4,400.20 1,540.07
Jumlah 24,372.08

1 M2 Pasang sulingan + injuk


Suling-Suling PVC 2" abu aw btg 0.1000 69,146.06 6,914.61
Ijuk kg 1.1000 23,214.21 25,535.63
Pekerja oh 0.0540 78,000.00 4,212.00
36,662.24

M-13 1 M' Pipa PVC θ 1" (AW)


Pipa PVC θ 1" (RUCIKA) m' 1.2000 14,318.12 17,181.75
Pekerja Oh 0.0360 78,000.00 2,808.00
Tukang Pipa Oh 0.0600 107,000.00 6,420.00
Sanitasi - Hal 86
Kepala Tukang Oh 0.0060 124,000.00 744.00
Mandor Oh 0.0018 160,000.00 288.00
Perlengkapan 35% harga pipa lot 0.3500 6,013.61 2,104.76
Jumlah 29,546.51
M-14 1 M' Pipa PVC θ 1 1/2" (AW)
Pipa PVC θ 1 1/2" (RUCIKA) m' 1.2000 24,183.66 29,020.39
Pekerja Oh 0.0360 78,000.00 2,808.00
Tukang Pipa Oh 0.0600 107,000.00 6,420.00
Kepala Tukang Oh 0.0060 124,000.00 744.00
Mandor oh 0.0018 160,000.00 288.00
Perlengkapan 35% harga pipa lot 0.3500 10,157.14 3,555.00
Jumlah 42,835.39
M-15 1 M' Pipa PVC θ 2" (AW)
Pipa PVC θ 2" (RUCIKA) M' 1.2000 31,779.25 38,135.10
Pekerja Oh 0.0360 78,000.00 2,808.00
Tukang batu Oh 0.0600 107,000.00 6,420.00
Kepala Tukang Oh 0.0060 124,000.00 744.00
Mandor Oh 0.0018 160,000.00 288.00
Perlengkapan 35% harga pipa lot 0.3500 13,347.28 4,671.55
Jumlah 53,066.65
M-16 1 M' Pipa PVC θ 4" (AW)
Pipa PVC θ 4" (RUCIKA) M' 1.2000 95,512.35 114,614.82
Pekerja Oh 0.0810 78,000.00 6,318.00
Tukang Pipa Oh 0.1350 107,000.00 14,445.00
Kepala Tukang Oh 0.0135 124,000.00 1,674.00
Mandor Oh 0.0041 160,000.00 656.00
Perlengkapan 35% harga pipa lot 0.3500 40,115.19 14,040.32
Jumlah 151,748.14

1 M' Pipa PVC θ 3" (AW)


Pipa PVC θ 3" (RUCIKA) Oh 1.2000 59,455.13 71,346.16
Pekerja Oh 0.0810 78,000.00 6,318.00
Tukang Pipa Oh 0.1350 107,000.00 14,445.00
Kepala Tukang Oh 0.0135 124,000.00 1,674.00
Mandor Oh 0.0041 160,000.00 656.00
Perlengkapan 35% harga pipa lot 0.3500 24,971.15 8,739.90
Jumlah 103,179.06

1 M' Pipa PVC θ 6" (AW)


Pipa PVC θ 6" (RUCIKA) Oh 1.2000 249,694.09 299,632.91
Pekerja Oh 0.0810 78,000.00 6,318.00
Tukang Pipa Oh 0.1350 107,000.00 14,445.00
Kepala Tukang lot 0.0135 124,000.00 1,674.00
Mandor Oh 0.0041 160,000.00 656.00
Perlengkapan 35% harga pipa lot 0.3500 104,871.52 36,705.03
Jumlah 359,430.94

M-17 1 M' Pipa PVC θ 3/4" (AW)


Pipa PVC θ 3/4" (RUCIKA) M' 1.2000 14,841.96 17,810.35
Pekerja Oh 0.0810 78,000.00 6,318.00
Tukang Pipa Oh 0.1350 107,000.00 14,445.00
Kepala Tukang Oh 0.0135 124,000.00 1,674.00
Mandor Oh 0.0041 160,000.00 656.00
Perlengkapan 35% harga pipa lot 0.3500 14,841.96 5,194.68
Jumlah 46,098.03
M-18 1 Buah Bak Cuci Piring Stainless Steel
Bak Cuci stainless steel + aksesoris lengkap buah 1.0000 598,926.78 598,926.78
Pekerja Oh 0.0300 78,000.00 2,340.00
Tukang Pipa Oh 0.3000 107,000.00 32,100.00
Kepala Tukang Oh 0.0300 124,000.00 3,720.00
Mandor Oh 0.0015 160,000.00 240.00
Jumlah 637,326.78
M-19 1 Buah Kran θ 1/2" - 3/4"
Kran air buah 1.0000 45,398.93 45,398.93
Seal tape buah 0.0250 22,500.00 562.50
Pekerja Oh 0.0100 78,000.00 780.00
Sanitasi - Hal 87
Tukang Pipa Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 59,481.43
M-20 1 Buah Floor Drain
Floor drain buah 1.0000 77,767.63 77,767.63
Pekerja Oh 0.0100 78,000.00 780.00
Tukang Pipa Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 91,287.63
M-21 1 M' Grafel Beton U 30cm - 60cm
Pipa beton buah 1.1000 53,900.00 59,290.00
Bata merah buah 12.0000 896.34 10,756.03
semen zak 0.1030 1,800.00 185.40
Pasir pasang M3 0.0305 317,260.95 9,676.46
Pasir Urug M3 0.0345 235,143.15 8,112.44
Pekerja Oh 0.0100 78,000.00 780.00
Tukang Batu Oh 0.1000 107,000.00 10,700.00
Kepala Tukang Oh 0.0100 124,000.00 1,240.00
Mandor Oh 0.0050 160,000.00 800.00
Jumlah 101,540.33
M-22 1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC M' 1.0500 69,642.65 73,124.78
Perlengkapan 35% harga talang lot 0.3500 69,642.65 24,374.93
Pekerja Oh 0.1500 78,000.00 11,700.00
Tukang Pipa Oh 0.4000 107,000.00 42,800.00
Kepala Tukang Oh 0.0250 124,000.00 3,100.00
Mandor Oh 0.0013 160,000.00 208.00
Jumlah 155,307.71
M-23 1 M' Saluran Air Limbah Buis Beton θ 60 cm
Buis beton θ 60 cm buah 1.1000 244,197.07 268,616.77
Bata Merah buah 25.0000 896.34 22,408.40
Semen Kg 0.2060 1,800.00 370.80
Pasir pasang M3 0.0610 317,260.95 19,352.92
Pasir urug M3 0.0690 235,143.15 16,224.88
Pekerja Oh 0.3800 78,000.00 29,640.00
Tukang batu Oh 0.1900 107,000.00 20,330.00
Kepala Tukang Oh 0.0190 124,000.00 2,356.00
Mandor Oh 0.0190 160,000.00 3,040.00
Jumlah 382,339.77
M-24 1 Buah Tangki Air Fiberglass Volume 1 M3
Bak fiberglass kapasitas 1 m3 buah 1.0000 464,284.34 464,284.34
Pekerja Oh 2.0000 78,000.00 156,000.00
Tukang Batu Oh 1.1000 107,000.00 117,700.00
Kepala Tukang Oh 0.0010 124,000.00 124.00
Mandor Oh 0.1600 160,000.00 25,600.00
Perlengkapan 6% harga bak lot 0.0600 464,284.34 27,857.06
Jumlah 791,565.40
M-25 1 Unit Septictank 2 x 1,50 x 1,50 m + Rembesan
Galian Tanah M3 4.5000 77,400.00 348,300.00
Pasir urug M3 0.2140 235,143.15 50,320.63
lantai kerja M3 2.2500 1,017,082.89 2,288,436.50
Pas. Bata adk 1pc : 3 ps M2 15.0000 140,599.97 2,108,999.48
Pelat beton K-225 M3 0.3000 1,205,258.59 361,577.58
Plesteran adk 1pc : 3ps M2 15.0000 68,458.42 1,026,876.29
Pipa PVC 4" jenis AW M' 5.4000 95,512.35 515,766.71
Pipa GIP 1 1/2" M' 5.0000 75,955.89 379,779.47
Galian tanah untuk rembesan M3 3.3750 77,400.00 261,225.00
pas. Ijuk kg 5.4000 153,789.00 830,460.60
Urugan kerikil 3/5 M3 1.0500 322,419.68 338,540.66
Pipa PVC 4" berlubang jenis AW M' 9.0000 19,992.99 179,936.89
Urugan dan Perataan tanah M3 1.1250 47,000.00 52,875.00
Jumlah 8,743,094.81
M-26 1 Unit Septictank 1 x 1,50 x 1,50 m + Rembesan
Galian Tanah m3 2.2500 62,500.00 140,625.00
Pasir urug m3 0.1070 235,143.15 25,160.32
lantai kerja m3 1.1250 1,017,082.89 1,144,218.25
Pas. Bata adk 1pc : 3ps m2 7.5000 140,599.97 1,054,499.74
Pelat beton K-225 m3 0.1500 1,205,258.59 180,788.79
Sanitasi - Hal 88
Plesteran adk 1pc : 3ps m2 7.5000 68,458.42 513,438.14
Pipa PVC 4" jenis AW m' 9.0000 23,878.09 214,902.80
Pipa GIP 1 1/2" m' 2.5000 18,988.97 47,472.43
Galian tanah untuk rembesan m3 1.6880 77,400.00 130,651.20
pas. Ijuk kg 2.7000 153,789.00 415,230.30
Urugan kerikil 3/5 m3 0.5250 257,900.00 135,397.50
Pipa PVC 4" berlubang jenis AW m' 9.0000 19,992.99 179,936.89
Urugan dan Perataan tanah m3 0.5630 20,833.33 11,729.17
Jumlah 4,194,050.53
M-27 Pekerjaan Septictank Komunal (Bio Fill 5000 kap 3,6 m3)
1 m3 Galian tanah biasa sedalam 1 m m3 3.7000 62,500.00 231,250.00
Pek. Buangan tanah m3 2.5000 27,340.00 68,350.00
Pek. Pasangan bata merah 1/2 (bata) 1 PC : 4 PS m3 22.4900 141,560.75 3,183,701.22
Pek. Plat Beton K-225
- Beton K-225 m3 0.2500 1,205,258.59 301,314.65
- Besi U-24 kg 22.0700 11,820.95 260,888.30
- Bekisting m3 2.1600 1,485,000.00 3,207,600.00
Pek. Pas. Pipa PVC dia 2" + Accesoris m' 0.5000 13,266.66 6,633.33
Pek. Pas. Pipa PVC dia 4" + Accesoris m' 2.0000 37,937.04 75,874.07
Sambungan Pipa PVC dia 4" buah 8.0000 60,066.27 480,530.16
Pek. Pas Bio Fill 5000 kap 3.6 m3 buah 1.0000 876,520.54 876,520.54
Jumlah 12,613,997.73
1 M' Pasang Saluran Air Hujan lebar 20 cm
Galian tanah m3 0.1000 62,500.00 6,250.00
Urugan pasir m3 0.0100 235,143.15 2,351.43
Pas. Bata merah ad. 1 : 5 m2 0.3500 133,744.27 46,810.49
Pas. Plesteran ad. 1 : 5 m2 0.4000 61,289.98 24,515.99
Pas. Beton K 100 m3 0.0150 949,655.79 14,244.84
Perapihan 5% - 1.0000 4,708.64 4,708.64
JUMLAH 98,881.39

Sanitasi - Hal 89
N. ANALISA HARGA SATUAN PEKERJAAN PENGECATAN

Analisa Harga Satuan Pekerjaan Pengecatan


Sesuai SNI 2002
HARGA 2016.
No URAIAN SATUAN VOLUME
SATUAN JUMLAH
N-01 Mengikis/Mengerok 1 m2 Perawatan Cat Tembok Lama
Soda api Kg 0.0500 39,584.25 1,979.21
Pekerja Oh 0.1500 78,000.00 11,700.00
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 14,079.21
N-02 Mendempul dan Menggosok 1 m2 Kayu
Dempul cat kg 0.0800 34,821.32 2,785.71
Minyak cat kg 0.0200 38,690.36 773.81
Batu apung kg 0.0100 32,809.43 328.09
Pekerja Oh 0.0400 78,000.00 3,120.00
Tukang cat Oh 0.0400 107,000.00 4,280.00
Kepala Tukang Oh 0.0040 124,000.00 496.00
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 12,183.61
N-03 Mengecat 1 m2 Bidang Kayu Lama
Plamir kg 0.1500 56,101.02 8,415.15
Cat dasar kg 0.1700 36,833.23 6,261.65
Cat penutup setara sieve 2x kg 0.1700 75,446.21 12,825.86
Pekerja Oh 0.0700 78,000.00 5,460.00
Tukang cat Oh 0.0750 107,000.00 8,025.00
Kepala Tukang Oh 0.0075 124,000.00 930.00
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 42,317.66
N-04 Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup)
Cat Meni kg 0.2000 27,083.25 5,416.65
Plamir kg 0.1500 56,101.02 8,415.15
Cat dasar kg 0.1700 36,833.23 6,261.65
Cat Penutup 3x setara Sieve kg 0.2600 75,446.21 19,616.01
Pekerja Oh 0.0700 78,000.00 5,460.00
Tukang cat Oh 0.0090 107,000.00 963.00
Kepala Tukang Oh 0.0060 124,000.00 744.00
Mandor Oh 0.0025 160,000.00 400.00
JUMLAH 47,276.47
N-05 Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 3 lps cat penutup)
Cat Meni kg 0.2000 27,083.25 5,416.65
Plamir kg 0.1500 56,101.02 8,415.15
Cat dasar kg 0.1700 36,833.23 6,261.65
Cat Penutup 3x setara Sieve kg 0.3500 75,446.21 26,406.17
Pekerja Oh 0.0700 78,000.00 5,460.00
Tukang cat Oh 0.1050 107,000.00 11,235.00
Kepala Tukang Oh 0.0040 124,000.00 496.00
Mandor Oh 0.0025 160,000.00 400.00
JUMLAH 64,090.62
N - 06 Mengecat 1 m2 Tembok Lama (1 lps cat dasar, 2 lps cat penutup)
Cat dasar Kg 0.1200 36,833.23 4,419.99
Cat Penutup 2x Set Vinilex Kg 0.1800 6,778.55 1,220.14
Pekerja Oh 0.0280 78,000.00 2,184.00
Tukang cat Oh 0.0420 107,000.00 4,494.00
Kepala Tukang Oh 0.0042 124,000.00 520.80
Mandor Oh 0.0025 160,000.00 400.00
Jumlah 13,238.93

Pengecatan - Hal 90
N - 07 Mengecatan 1 m2 Plafond Vinilex (3x)
Cat Tembok setara Vinilex kg 0.1500 6,778.55 1,016.78
Plamir Tembok kg 0.1600 56,101.02 8,976.16
Rol Cat buah 0.0100 38,690.36 386.90
Steger werk ls 1.0000 1,800.00 1,800.00
Ampelas lbr 0.5000 4,642.84 2,321.42
Pekerja Oh 0.2000 78,000.00 15,600.00
Tukang cat Oh 0.3000 107,000.00 32,100.00
Kepala Tukang Oh 0.0300 124,000.00 3,720.00
Mandor Oh 0.0100 160,000.00 1,600.00
67,521.27

Mengecatan 1 m2 Plafond ACI (3x)


Cat Tembok ACI kg 0.1500 90,797.85 13,619.68
Plamir Tembok kg 0.1600 56,101.02 8,976.16
Rol Cat buah 0.0100 38,690.36 386.90
Steger werk ls 1.0000 1,800.00 1,800.00
Ampelas lbr 0.5000 4,642.84 2,321.42
Pekerja Oh 0.2000 78,000.00 15,600.00
Tukang cat Oh 0.3000 107,000.00 32,100.00
Kepala Tukang Oh 0.0300 124,000.00 3,720.00
Mandor Oh 0.0100 160,000.00 1,600.00
80,124.17
N - 08 Mengecatan 1 m2 Plafond set Vinilex ( 2x)
Cat Tembok setara Vinilex kg 0.1000 6,778.55 677.86
Plamir Tembok kg 0.1067 56,101.02 5,984.11
Rol Cat buah 0.0067 38,690.36 257.94
Alat bantu ls 0.6667 1,800.00 1,200.00
Ampelas lbr 0.3333 4,642.84 1,547.61
Pekerja Oh 0.1333 78,000.00 10,400.00
Tukang cat Oh 0.2000 107,000.00 21,400.00
Kepala Tukang Oh 0.0200 124,000.00 2,480.00
Mandor Oh 0.0067 160,000.00 1,066.67
45,014.18
N - 09 Mengecat 1 m2 Tembok Baru Set Vinilex (1 lps plamir, 1 lps cat dasar,3 lps cat penutup)
Plamir tembok kg 0.1000 56,101.02 5,610.10
Cat dasar kg 0.1000 36,833.23 3,683.32
Cat Penutup 3 X set Vinilex kg 0.3900 33,892.76 13,218.18
Pekerja Oh 0.0300 78,000.00 2,340.00
Tukang cat Oh 0.0945 107,000.00 10,111.50
Kepala Tukang Oh 0.0095 124,000.00 1,178.00
Mandor Oh 0.0038 160,000.00 608.00
JUMLAH 36,749.10

Mengecat 1 m2 Tembok Baru ACI (1 lps plamir, 1 lps cat dasar,3 lps cat penutup)
Plamir tembok kg 0.1000 56,101.02 5,610.10
Cat dasar kg 0.1000 36,833.23 3,683.32
Cat Penutup 3 X ACI kg 0.3900 90,797.85 35,411.16
Pekerja Oh 0.0300 78,000.00 2,340.00
Tukang cat Oh 0.0945 107,000.00 10,111.50
Kepala Tukang Oh 0.0095 124,000.00 1,178.00
Mandor Oh 0.0038 160,000.00 608.00
JUMLAH 58,942.09

Mengecat 1 m2 Water proping


Water pro[ping membrans kg 0.3900 111,751.20 43,582.97
Pekerja Oh 0.0300 78,000.00 2,340.00
Tukang cat Oh 0.0945 107,000.00 10,111.50
Kepala Tukang Oh 0.0095 124,000.00 1,178.00
Mandor Oh 0.0038 160,000.00 608.00
JUMLAH 57,820.47

N - 10 Mengecat 1 m2 Tembok Baru Set Vinilex (1 lps plamir, 1 lps cat dasar,2 lps cat penutup)
Plamir tembok kg 0.1000 56,101.02 5,610.10
Cat dasar kg 0.1000 36,833.23 3,683.32
Cat Penutup 2 X set Vinilex kg 0.2600 33,892.76 8,812.12
Pekerja Oh 0.0200 78,000.00 1,560.00
Tukang cat Oh 0.0630 107,000.00 6,741.00
Pengecatan - Hal 91
Kepala Tukang Oh 0.0063 124,000.00 785.33
Mandor Oh 0.0025 160,000.00 405.33
JUMLAH 27,597.21
N - 11 Mengecatan 1 m2 Plafond (3x) luar 2 lantai / lebih
Cat Tembok setara vinilex kg 0.1500 33,990.00 5,098.50
Rol Cat buah 0.0100 27,500.00 275.00
Steger werk ls 1.0000 33,453.74 33,453.74
Ampelas lbr 0.5000 4,656.30 2,328.15
Pekerja Oh 0.2000 78,000.00 15,600.00
Tukang cat Oh 0.3000 107,000.00 32,100.00
Kepala Tukang Oh 0.0300 124,000.00 3,720.00
Mandor Oh 0.0100 160,000.00 1,600.00
Jumlah 94,175.39

Pengecatan - Hal 92
K(2) Analisa Biaya Konstruksi Pekerjaan Kusen Alumunium

1 1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu klas II
Bahan 7.6200 m' Kusen Alumunium Natural Uk 4" + upah 20% 171,165.18 1,304,278.64
1.3500 lbr Multiplek 9 mm 213,570.79 288,320.57
0.0300 m3 Kayu papan Kelas II 2,851,734.60 85,552.04
11.7000 m' List kayu profil 1 cm 12,999.96 152,099.50
0.1000 kg Paku biasa ½" - 1" 23,988.03 2,398.80
0.2500 kg Lem putih FOX 44,880.82 11,220.20
4.0000 bh Grendel jendela 2" 14,341.23 57,364.92
2.0000 bh Handle partisi 36,085.21 72,170.43
1.5400 m2 Cat kayu 47,276.47 72,805.76
4.8600 m2 Cat tembok 27,597.21 134,122.43
Jumlah I 2,180,333.29

Tenaga 0.3000 Oh Pekerja Terampil 78,000.00 23,400.00


1.3000 Oh Tukang kayu Terampil 107,000.00 139,100.00
0.1300 Oh Kepla Tukang Kayu 124,000.00 16,120.00
0.0130 Oh Mandor 160,000.00 2,080.00
Jumlah II 180,700.00
Jumlah I + II 2,361,033.29
2 1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
Bahan 12.0000 m' Profil aluminium 4" natural + upah 20% 171,165.18 2,053,982.11
5.4000 m2 Profil daun jendela alm. + upah 20% 117,493.20 634,463.28
1.8100 m2 Kaca polos 5 mm 136,190.07 246,504.03
2.0000 ps Engsel jendela 3" 38,388.74 76,777.47
2.0000 bh Slot Handle jendela 26,931.58 53,863.17
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
0.0000 ls Acesories ( 5 % ) 146,747.47 146,747.47
JUMLAH 3,262,325.481
3 1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
Bahan 14.1000 m' Profil aluminium 4" natural + upah 20% 171,165.18 2,413,428.98
2.7000 m' Profil daun jendela alm. + upah 20% 117,493.20 317,231.64
1.6500 m2 Kaca polos 5 mm 136,190.07 224,713.62
1.6800 m2 Daun pintu panel Multiplek 9 mm 422,239.71 709,362.71
rangka ky. Kelas II -
1.0000 ps Engsel jendela 3" 38,388.74 38,388.74
1.0000 bh Slot Handle jendela 26,931.58 26,931.58
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 bh Grendel pintu 2" 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 147,768.71 147,768.71
JUMLAH 4,097,212.415
4 1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M'
Bahan 7.0000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,198,156.23
0.3700 m2 Kaca polos 5 mm 136,190.07 50,390.33
1.6800 m2 Daun pintu panel Multiplek 9 mm 422,239.71 709,362.71
rangka ky. Kelas II
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 bh Grendel pintu 2" 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 97,895.46 97,895.46
JUMLAH 2,225,203.215
4-r' 1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
Bahan 15.0000 Kg Besi siku L 30.30.3 52,647.41 789,711.12
32.8000 Kg Plat besi tbl.2mm 18,571.37 609,140.95
0.0500 Kg kawat las 42,559.40 2,127.97
0.2000 Oh Pekerja 78,000.00 15,600.00
0.2000 Oh Tukang kayu 107,000.00 21,400.00
0.0200 Oh Kepala tukang 124,000.00 2,480.00
0.0010 Oh Mandor 160,000.00 160.00
JUMLAH 1,440,620.039
4 1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M' (daun pintu besi plat tbl 2 mm)
Bahan 7.0000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,198,156.23
0.3700 m2 Kaca polos 5 mm 136,190.07 50,390.33
1.4000 m2 Daun pintu besi plat tbl. 2mm rangkap 1,440,620.04 2,016,868.05
rangka besi siku
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 bh Grendel pintu 2" 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 163,270.73 163,270.73
JUMLAH 3,598,083.827

4 1 UNIT Pekerjaan Kusen Pintu Alumunium KM/WC Lapis Formika uk. 0,8 X 2,70 M'
Bahan 7.0000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,198,156.23
0.3700 m2 Kaca polos 5 mm 136,190.07 50,390.33
1.6800 m2 Daun pintu rangkap triplek 4 mm 541,728.68 910,104.19
rangka ky. Kelas II lapis formika
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 bh Grendel pintu 2" 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 107,932.54 107,932.54
JUMLAH 2,435,981.767
5 1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
Bahan 15.4500 m' Profil aluminium 4" natural + upah 20% 171,165.18 2,644,501.97
5.4000 m' Profil daun jendela alm. + upah 20% 117,493.20 634,463.28
2.5500 m2 Kaca polos 5 mm 136,190.07 347,284.69
2.0000 ps Engsel jendela 3" 38,388.74 76,777.47
2.0000 bh Slot Handle jendela 26,931.58 53,863.17
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
0.0000 ls Acesories ( 5 % ) 181,312.50 181,312.50
JUMLAH 3,988,191.017
6 1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
Bahan 17.5500 m' Profil aluminium 4" natural + upah 20% 171,165.18 3,003,948.84
5.4000 m' Profil daun jendela alm. + upah 20% 117,493.20 634,463.28
2.4000 m2 Kaca polos 5 mm 136,190.07 326,856.17
1.6800 m2 Daun pintu panel Multiplek 9 mm 422,239.71 709,362.71
rangka ky. Kelas II
2.0000 ps Engsel jendela 3" 38,388.74 76,777.47
2.0000 bh Slot Handle jendela 26,931.58 53,863.17
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 bh Grendel pintu 2" 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 198,263.41 198,263.41
JUMLAH 5,222,921.487
7 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
Bahan 8.9000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,523,370.06
0.6500 m2 Kaca polos 5 mm 136,190.07 88,523.55
2.7300 m2 Daun pintu panel Multiplek 9 mm 422,239.71 1,152,714.40
rangka ky. Kelas II
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 ps Espagnolet tanam 66,470.04 66,470.04
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 138,230.40 138,230.40
JUMLAH 3,124,365.707
8 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
Bahan 8.8000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,506,253.55
0.7000 m2 Kaca polos 5 mm 136,190.07 95,333.05
2.9400 m2 Daun pintu panel Multiplek 9 mm 422,239.71 1,241,384.74
rangka ky. Kelas II
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 ps spagnolet tanam 66,470.04 66,470.04
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 142,148.57 142,148.57
JUMLAH 3,206,647.198
9 1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
Bahan 10.7500 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,840,025.64
1.0700 m2 Kaca polos 5 mm 136,190.07 145,723.38
1.6800 m2 Daun pintu panel Multiplek 9 mm 422,239.71 709,362.71
rangka ky. Kelas II
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 ps spagnolet tanam 66,470.04 66,470.04
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 134,755.59 134,755.59
JUMLAH 3,051,394.605
10 1 UNIT Pekerjaan Jalusi Alumunium Sofi-sofi
Bahan 5.1000 m' Profil aluminium 4" natural + upah 20% 171,165.18 872,942.40
8.0000 m2 Jalusi Alm 66,522.19 532,177.51
0.0000 ls Acesories ( 5 % ) 70,256.00 70,256.00
JUMLAH 1,475,375.902
11 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
Bahan 4.0000 m' Profil aluminium 4" natural + upah 20% 171,165.18 684,660.70
0.2400 m2 Kaca polos 5 mm 136,190.07 32,685.62
0.0000 ls Acesories ( 5 % ) 35,867.32 35,867.32
JUMLAH 753,213.637
12 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m
Bahan 4.5000 m' Profil aluminium 4" natural + upah 20% 171,165.18 770,243.29
0.4800 m2 Kaca polos 5 mm 136,190.07 65,371.23
0.0000 ls Acesories ( 5 % ) 41,780.73 41,780.73
JUMLAH 877,395.252
13 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
Bahan 6.4000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,095,457.13
0.7200 m2 Kaca polos 5 mm 136,190.07 98,056.85
0.0000 ls Acesories ( 5 % ) 59,675.70 59,675.70
JUMLAH 1,253,189.677
14 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m
Bahan 8.3000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,420,670.96
0.9600 m2 Kaca polos 5 mm 136,190.07 130,742.47
0.0000 ls Acesories ( 5 % ) 77,570.67 77,570.67
JUMLAH 1,628,984.101
15 1 UNIT Pek. Kusen Jendela Alm.uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela tampa BV
Bahan 11.4500 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,959,841.26
5.4000 m' Profil daun jendela alm. + upah 20% 117,493.20 634,463.28
2.5500 m2 Kaca polos 5 mm 136,190.07 347,284.69
2.0000 ps Engsel jendela 3" 38,388.74 76,777.47
2.0000 bh Slot Handle jendela 26,931.58 53,863.17
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
0.0000 ls Acesories ( 5 % ) 147,079.46 147,079.46
JUMLAH 3,269,297.279
16 1 UNIT Pek. Kusen Pintu & Jendela Alm.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu ) tampa BV
Bahan 8.2000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,403,554.44
0.7200 m2 Kaca polos 5 mm 136,190.07 98,056.85
1.6800 m2 Daun pintu panel Multiplek 9 mm 422,239.71 709,362.71
rangka ky. Kelas II
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 ps spagnolet tanam 66,470.04 66,470.04
1.0000 bh Kunci tanam 2 slaagh (Royal) 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 110,548.70 110,548.70
JUMLAH 2,543,049.995
17 1 UNIT Pek. Kusen Jendela Alm.uk. 2,00 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela tampa BV
Bahan 10.2500 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,754,443.05
5.4000 m' Profil daun jendela alm. + upah 20% 117,493.20 634,463.28
1.6500 m2 Kaca polos 5 mm 136,190.07 224,713.62
2.0000 ps Engsel jendela 3" 38,388.74 76,777.47
2.0000 bh Slot Handle jendela 26,931.58 53,863.17
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
0.0000 ls Acesories ( 5 % ) 130,681.00 130,681.00
JUMLAH 2,924,929.539
18 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,00 M' ( 2 Daun Pintu )tampa BV
Bahan 7.6000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,300,855.34
2.9400 m2 Daun pintu panel Multiplek 9 mm 422,239.71 1,241,384.74
rangka ky. Kelas II
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 ps spagnolet tanam 66,470.04 66,470.04
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 127,112.00 127,112.00
JUMLAH 2,890,879.373
19 1 UNIT Pek. Kusen Pintu & Jendela Alum uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu ) tampa BV
Bahan 12.3000 m' Profil aluminium 4" natural + upah 20% 171,165.18 2,105,331.66
5.4000 m' Profil daun jendela alm. + upah 20% 117,493.20 634,463.28
1.1000 m2 Kaca polos 5 mm 136,190.07 149,809.08
1.6800 m2 Daun pintu panel Multiplek 9 mm 422,239.71 709,362.71
rangka ky. Kelas II
2.0000 ps Engsel jendela 3" 38,388.74 76,777.47
2.0000 bh Slot Handle jendela 26,931.58 53,863.17
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 bh Grendel pintu 2" 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 144,480.20 144,480.20
JUMLAH 4,093,474.006
20 1 UNIT Pek. Kusen Pintu & Jendela Alm.3,1 X 2,70 M' ( 2 lb. Jendela + 2 lb. Pintu )
Bahan 19.5000 m' Profil aluminium 4" natural + upah 20% 171,165.18 3,337,720.93
2.1400 m2 Kaca polos 5 mm 136,190.07 291,446.76
3.3600 m2 Daun pintu panel Multiplek 9 mm 422,239.71 1,418,725.42
rangka ky. Kelas II -
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 ps spagnolet tanam 66,470.04 66,470.04
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 252,394.66 252,394.66
JUMLAH 5,521,815.049
3 1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
Bahan 10.4000 m' Profil aluminium 4" natural + upah 20% 171,165.18 1,780,117.83
2.7000 m' Profil daun jendela alm. + upah 20% 117,493.20 317,231.64
1.6500 m2 Kaca polos 5 mm 136,190.07 224,713.62
1.6800 m2 Daun pintu panel Multiplek 9 mm 422,239.71 709,362.71
rangka ky. Kelas II -
1.0000 ps Engsel jendela 3" 38,388.74 38,388.74
1.0000 bh Slot Handle jendela 26,931.58 26,931.58
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 bh Grendel pintu 2" 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 116,103.15 116,103.15
JUMLAH 3,432,235.707
2 1 UNIT Pek. Kusen Jendela Alum warna uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
Bahan 12.0000 m' Profil aluminium 4" warna + upah 20% 228,035.12 2,736,421.38
5.4000 m' Profil daun jendela alm. + upah 20% 106,499.63 575,098.02
1.8100 m2 Kaca polos 5 mm 136,190.07 246,504.03
2.0000 ps Engsel jendela 3" 19,940.60 39,881.21
2.0000 bh Slot Handle jendela 26,931.58 53,863.17
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
0.0000 ls Acesories ( 5 % ) 177,901.17 177,901.17
JUMLAH 3,879,656.931
3 1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
Bahan 14.1000 m' Profil aluminium 4" warna + upah 20% 228,035.12 3,215,295.12
2.7000 m' Profil daun jendela alm. + upah 20% 106,499.63 287,549.01
1.6500 m2 Kaca polos 5 mm 136,190.07 224,713.62
1.6800 m2 Daun pintu alumunium warna tanpa kaca 532,557.96 894,697.37
1.0000 ps Engsel jendela 3" 19,940.60 19,940.60
1.0000 bh Slot Handle jendela 26,931.58 26,931.58
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 bh Grendel pintu 2" 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 186,377.89 186,377.89
Jumlah 5,074,891.630
4 1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M'
Bahan 7.0000 m' Profil aluminium 4" warna + upah 20% 228,035.12 1,596,245.81
0.3700 m2 Kaca polos 5 mm 136,190.07 50,390.33
1.6800 m2 Daun pintu alumunium warna tanpa kaca 532,557.96 894,697.37
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 bh Grendel pintu 2" 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 127,066.67 127,066.67
Jumlah I 2,837,798.658
8 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
Bahan 8.8000 m' Profil aluminium 4" warna + upah 20% 228,035.12 2,006,709.01
0.7000 m2 Kaca polos 5 mm 136,190.07 95,333.05
2.9400 m2 Daun pintu alumunium warna tanpa kaca 532,557.96 1,565,720.39
1.5000 ps Engsel pintu 4" 16,452.32 24,678.47
1.0000 ps spagnolet tanam 14,341.23 14,341.23
1.0000 bh Kunci tanam 2 slaagh 130,378.78 130,378.78
0.0000 ls Acesories ( 5 % ) 183,388.12 183,388.12
JUMLAH 4,020,549.063
11 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
Bahan 4.0000 m' Profil aluminium 4" warna+ upah 20% 228,035.12 912,140.46
0.2400 m2 Kaca polos 5 mm 130,378.78 31,290.91
0.0000 ls Acesories ( 5 % ) 47,171.57 47,171.57
JUMLAH 990,602.936
13 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
Bahan 6.4000 m' Profil aluminium 4" warna + upah 20% 228,035.12 1,459,424.74
0.7200 m2 Kaca polos 5 mm 130,378.78 93,872.72
0.0000 ls Acesories ( 5 % ) 77,664.87 77,664.87
JUMLAH 1,630,962.332
2 1 UNIT Pek. Kusen Jendela Alumunium ( 2 lubang ) dgn 2 Daun Jendela
Bahan 12.0000 m' Profil aluminium 4" warna + upah 20% 228,035.12 2,736,421.38
3.6000 m' Profil daun jendela alm. + upah 20% 106,499.63 383,398.68
1.8100 m2 Kaca polos 5 mm 130,378.78 235,985.60
2.0000 ps Engsel jendela 3" 19,940.60 39,881.21
2.0000 bh Slot Handle jendela 26,931.58 53,863.17
2.0000 bh Hak Kait angin jendela biasa 24,993.98 49,987.95
0.0000 ls Acesories ( 5 % ) 167,790.28 167,790.28
JUMLAH 3,667,328.268

Anda mungkin juga menyukai