2013
#VALUE! #VALUE!
KODE KEGIATAN SASARAN ALOKASI (Ribuan Rp) Ketersediaan desain Keterangan Tahun 2014
RUAS LOKASI BIAYA (baseline)
KGIAT INDKTOR KM/M MURNI PHLN Target Biaya Sasaran Alokasi (Ribuan Rp)
KESIMPULAN
PRIORITAS 501,680,650 - 501,680,650 804,070,650
A. Kebutuhan MYC 2012 - 2014 179.60 173,000,000 - 173,000,000 MYC 2012/2014 178.33 147,000,000
B. Pemeliharaan Rutin Jalan 1,561.33 47,441,250 - 47,441,250 1,561.33 47,441,250
C. Pemeliharaan Rutin Jembatan 20,744.70 41,489,400 - 41,489,400 20,744.70 41,489,400
D. Kebutuhan MYC 2013 - 2014 239,750,000 - 239,750,000 Rencana MYC 2013/2014 568,140,000
06 Penggantian Jembatan - - -
WILAYAH - II - - -
09 Pelebaran Jalan - - - - -
WILAYAH - I - - - - - -
Beureunun - Keumala P.009.1 Pidie
GENTING GERBANG - CELALA - BTS. ACEH BARAT 044 - New Inisiative
JEURAM - SIMPANG PEUT 046 - New Inisiative
477091 SATKER : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI ACEH 75,929,536 75,929,536 83,031,227
A SATKER INDUK 75,929,536 75,929,536 83,031,227
2409 Pelaksanaan Preservasi dan Peningkatan Kapasitas Jalan Nasional 75,929,536 75,929,536 83,031,227
Pengadaan tanah untuk kantor (3 satker) 7,500,000 7,500,000
14 Pengumpulan Data Jalan Dan Jembatan - 1,350,000 1,350,000 1,620,000
Survey IRMS - 750,000 - 750,000 522113 900,000
- ATK dan Bahan komputer 34,400 34,400 521211 41,280
- Penggandaan, penyusunan laporan dan pengiriman surat dinas 39,800 39,800 521219 47,760
- Perjalanan dinas daerah, transport dan uang harian 279,600 279,600 524119 335,520
- Honor yang terkait dengan output kegiatan 235,200 235,200 521213 282,240
- Belanja sewa 161,000 161,000 522114 193,200
B. Survey BMS - 600,000 - 600,000 522113 720,000
- ATK dan Bahan komputer 33,000 33,000 521211 39,600
- Penggandaan, penyusunan laporan dan pengiriman surat dinas 24,000 24,000 521219 28,800
- Perjalanan dinas daerah, transport dan uang harian 279,600 279,600 524119 335,520
- Honor yang terkait dengan output kegiatan 176,400 176,400 521213 211,680
- Belanja sewa 87,000 87,000 522114 104,400
-
15 Perencanaan Teknis Dan Pengawasan Teknis Jalan Dan Jembatan - 72,385,490 72,385,490 78,778,372
430 Pengawasan/Supervisi Konstruksi - 34,411,080 34,411,080 534111 Pengawasan/Supervisi 42,450,940
Pengawasan/Supervisi Konstruksi (SKPD) 1,000,000 1,000,000 534111 Konstruksi 1,000,000
Pengawasan Teknik Jalan lIntas Timur (MYC 2012-2014) 2,384,000 2,384,000 534111 714.7
Pengawasan Teknik Jalan lIntas Tengah (MYC 2012-2014) 1,495,740 1,495,740 534111 1,126.9
Pengawasan Teknik Jalan lIntas Barat (MYC 2012-2014) 2,879,070 2,879,070 534111 2,190.8
Pengawasan Rencana MYC Lintas Timur (MYC 2013-2014) 3,925,200 3,925,200 Pengawasan Rencana MYC 5,887,800
Pengawasan Rencana MYC Lintas Tengah (MYC 2013-2014) 3,577,600 3,577,600 Lintas Timur Rencana
Pengawasan (MYC 2013-
MYC 5,366,400
2014) Tengah (MYC 2013-
Lintas
Pengawasan Rencana MYC Non Lintas dan Jembatan (MYC 2013-2014) 2,712,800 2,712,800 Pengawasan Rencana MYC 4,069,200
2014)
Lintas Strategis (MYC 2013-
439 Penyusunan Detail Desain 20,000,000 - 20,000,000 534111 20,000,000
2014)
-
18 Monitoring dan Evaluasi pelaksanaan Jalan dan Jembatan - 363,620 - 363,620 436,344
514 Monitoring dan Evaluasi -
A. Monitoring Jalan Nasional dan Provinsi 198,000 198,000 237,600
- ATK dan Bahan komputer 9,600 9,600 521211 11,520
- Penggandaan, penyusunan laporan dan pengiriman surat dinas 15,600 15,600 521219 18,720
- Perjalanan dinas daerah, transport dan uang harian 172,800 172,800 524119 207,360
B. Monitoring Jalan Kabupaten/DAK 165,620 165,620 198,744
- ATK dan Bahan komputer 8,400 8,400 521211 10,080
- Penggandaan, penyusunan laporan, pengiriman surat dinas dan cetak foto 12,500 12,500 521219 15,000
- Perjalanan dinas daerah, transport dan uang harian 144,720 144,720 524119 173,664
-
23 Pemenuhan Kebutuhan Prasarana & Sarana Perkantoran - 152,750 - 152,750 183,300
016 Pemeliharaan dan peremajaan alat studio/komunikasi - 2,750 - 2,750 523121 3,300
023 Pengadaan barang 150,000 150,000 532111 180,000
-
24 Layanan Perkantoran - 1,677,676 - 1,677,676 2,013,211
001 Pembayaran tunjangan PNS - 67,620 - 67,620 511134 81,144
Lembur dan uang makan lembur - 451,332 - 451,332 512211 541,598
Honorarium pengemudi, pramubakti - 75,600 - 75,600 521111 90,720
Honor operasional satuan kerja - 94,800 - 94,800 521115 113,760
KODE KEGIATAN SASARAN ALOKASI (Ribuan Rp) Ketersediaan desain Keterangan Tahun 2014
RUAS LOKASI BIAYA (baseline)
KGIAT INDKTOR KM/M MURNI PHLN Target Biaya Sasaran Alokasi (Ribuan Rp)
Honor yang terkait dengan output kegiatan - 34,145 - 34,145 521213 40,974
002 Penyelenggaraan operasional dan pemeliharaan perkantoran - 68,145 - 68,145 523121 81,774
Langganan telpon, internet, listrik 122,664 122,664 522111 147,197
Pemeliharaan dan peremajaan alat studio/komunikasi - 105,566 - 105,566 523121 126,679
011 Administrasi kegiatan - 81,854 - 81,854 521211 98,225
- Penggandaan, eks. Kantor, cetak dan pengiriman barang/dokumen - 116,000 - 116,000 521219 139,200
- Perjalanan dinas ke Medan dan Jakarta, uang harian, penginapan dan taxi - 459,950 - 459,950 524119 551,940
Tahun 2015 Tahun 2016 New Inisiative
Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Harga Satuan
523,613 628,335 -
381,262,700 431,112,700 -
620.77 21,827,900 620.77 21,827,900 - -
9,117.40 18,234,800 9,117.40 18,234,800 - -
- - - - - -
58.00 8,700,000 - - - -
- - - - - -
100.00 30,000,000 200.00 60,000,000 - -
10.00 87,500,000 9.00 82,500,000 - -
- - - - - -
21.00 215,000,000 24.21 248,550,000 - -
662,132,750 794,447,750 300,000,000
545.79 13,644,750 545.79 13,644,750 - -
7,901.50 15,803,000 7,901.50 15,803,000 - -
47.09 141,270,000 55.00 165,000,000 - -
165.70 24,855,000 - - - -
- - 20.00 100,000,000 5.00 25,000,000
260.00 54,000,000 200.00 60,000,000 - -
12.50 125,000,000 14.50 165,000,000 2.70 13,500,000
225.00 112,500,000 350.00 175,000,000 2,300.00 261,500,000
31.68 175,060,000 15.00 100,000,000 - -
608,944,837 596,357,410 -
382.22 11,466,600 382.22 11,466,600 - -
3,673.70 7,347,400 3,673.70 7,347,400 - -
35.00 105,000,000 35.00 105,000,000 - -
232.40 83,837,427 500.00 50,000,000 - -
12.55 62,750,000 5.80 29,000,000 - -
200.00 80,000,000 350.00 135,000,000 - -
22.50 125,000,000 12.50 125,000,000 - -
- - - - - -
38.16 133,543,410 38.16 133,543,410 - -
125,606,200 165,606,200 124,500,000
12.55 502,000 12.55 502,000 - -
52.10 104,200 52.10 104,200 - -
- - - - - -
- - - - - -
20.00 100,000,000 20.00 100,000,000 15.00 75,000,000
- - - - - -
- - - - - -
- - - - - -
5.00 25,000,000 13.00 65,000,000 11.00 49,500,000
30,000,000 30,000,000 -
87,276,028 97,464,253 -
11,568,924 13,882,709 #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
523,613 628,335 -
276,700,650 117,930,650 -
13.00 61,500,000 5.80 29,000,000 - -
1,561.33 47,441,250 1,561.33 47,441,250 - -
20,744.70 41,489,400 20,744.70 41,489,400 - -
126,270,000 - -
381,262,700 431,112,700 -
620.77 21,827,900 620.77 21,827,900 - -
520.45 18,818,300 520.45 18,818,300
11.96 478,400 11.96 478,400 40,000
1.00 30,000 1.00 30,000 30,000
2.11 63,300 2.11 63,300 30,000
1.16 34,800 1.16 34,800 30,000
5.15 154,500 5.15 154,500 30,000
4.40 132,000 4.40 132,000 30,000
98.45 3,938,000 98.45 3,938,000 40,000
40.00 1,600,000 40.00 1,600,000 40,000
39.00 1,170,000 39.00 1,170,000 30,000
65.40 1,962,000 65.40 1,962,000 30,000
4.70 141,000 4.70 141,000 30,000
59.48 2,379,200 59.48 2,379,200 40,000
0.85 34,000 0.85 34,000 40,000
1.40 56,000 1.40 56,000 40,000
58.64 2,345,600 58.64 2,345,600 40,000
49.70 1,988,000 49.70 1,988,000 40,000
31.55 946,500 31.55 946,500 30,000
45.50 1,365,000 45.50 1,365,000 30,000
100.32 3,009,600 100.32 3,009,600
12.00 360,000 12.00 360,000 30,000
0.91 27,300 0.91 27,300 30,000
1.29 38,700 1.29 38,700 30,000
16.27 488,100 16.27 488,100 30,000
0.80 24,000 0.80 24,000 30,000
9.00 270,000 9.00 270,000 30,000
60.05 1,801,500 60.05 1,801,500 30,000
- - - - - -
- - - - - -
#DIV/0!
#DIV/0!
#DIV/0!
3,000,000
- - - - - -
3,000,000
58.00 8,700,000 - - - -
58.00 8,700,000 - - - -
7.00 1,050,000
40.00 6,000,000
164,000
11.00 1,650,000
- - - - - -
- - - - - -
Tahun 2015 Tahun 2016 New Inisiative
Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Harga Satuan
#DIV/0!
2,084,294
- - - - - - 10,000,000
10,000,000
Tahun 2015 Tahun 2016 New Inisiative
Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Harga Satuan
100.00 30,000,000 200.00 60,000,000 - -
100.00 30,000,000 200.00 60,000,000 - -
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00 30,000,000 200.00 60,000,000
- - - - - -
- - - - - -
#DIV/0!
250,000
250,000
192,308
#DIV/0!
#DIV/0!
#DIV/0!
- #DIV/0!
165.70 24,855,000 - - - -
128.50 19,275,000 - - - -
16.00 2,400,000 #DIV/0!
14.00 2,100,000 #DIV/0!
11.50 1,725,000 #DIV/0!
14.00 2,100,000 #DIV/0!
73.00 10,950,000 #DIV/0!
37.20 5,580,000 - - - - 140,835
6.00 900,000 #DIV/0!
4.70 705,000 #DIV/0!
14.00 2,100,000 #DIV/0!
6.00 900,000 #DIV/0!
6.50 975,000 #DIV/0!
39,000
150,000
150,000
Tahun 2015 Tahun 2016 New Inisiative
Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Harga Satuan
- - 20.00 100,000,000 5.00 25,000,000
- - - - 5.00 25,000,000
5.00 25,000,000 #DIV/0!
5,000,000
- - 20.00 100,000,000 - - 5,000,000
- - 5,000,000
80,000,000 5,000,000
5,000,000
- - 5,650,000 5,000,000
5,000,000
20.00 100,000,000
11.68 52,560,000 - - - -
10,000,000 10,000,000
4,500,000
#DIV/0!
60,750,000 4,500,000
74,250,000 4,500,000
#DIV/0!
4,500,000
4,500,000
7.00 31,500,000 10,000,000
4.68 21,060,000 #DIV/0!
Tahun 2015 Tahun 2016 New Inisiative
Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Harga Satuan
608,944,837 596,357,410 -
382.22 11,466,600 382.22 11,466,600 - -
74.60 2,238,000 74.60 2,238,000 - -
6.70 201,000 6.70 201,000 30,000
1.70 51,000 1.70 51,000 30,000
2.80 84,000 2.80 84,000 30,000
63.40 1,902,000 63.40 1,902,000 30,000
239.51 7,185,300 239.51 7,185,300 - -
13.00 390,000 13.00 390,000 30,000
15.20 456,000 15.20 456,000 30,000
2.30 69,000 2.30 69,000 30,000
0.90 27,000 0.90 27,000 30,000
17.56 526,800 17.56 526,800 30,000
23.80 714,000 23.80 714,000 30,000
20.90 627,000 20.90 627,000 30,000
25.50 765,000 25.50 765,000 30,000
0.30 9,000 0.30 9,000 30,000
19.80 594,000 19.80 594,000 30,000
3.50 105,000 3.50 105,000 30,000
33.35 1,000,500 33.35 1,000,500 30,000
61.00 1,830,000 61.00 1,830,000 30,000
1.20 36,000 1.20 36,000 30,000
0.80 24,000 0.80 24,000 30,000
0.40 12,000 0.40 12,000 30,000
68.11 2,043,300 68.11 2,043,300 - -
68.11 2,043,300 68.11 2,043,300 30,000
Tahun 2015 Tahun 2016 New Inisiative
Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Harga Satuan
3,673.70 7,347,400 3,673.70 7,347,400 - -
589.60 1,179,200 589.60 1,179,200 - -
25.50 51,000 25.50 51,000 2,000
564.10 1,128,200 564.10 1,128,200 2,000
3,084.10 6,168,200 3,084.10 6,168,200 - - 2,000
115.80 231,600 115.80 231,600 2,000
91.00 182,000 91.00 182,000 2,000
173.50 347,000 173.50 347,000 2,000
150.70 301,400 150.70 301,400 2,000
462.20 924,400 462.20 924,400 2,000
366.70 733,400 366.70 733,400 2,000
584.50 1,169,000 584.50 1,169,000 2,000
292.70 585,400 292.70 585,400 2,000
393.00 786,000 393.00 786,000 2,000
454.00 908,000 454.00 908,000 2,000
- - - - - -
- - - - - -
239,794
- - - - - -
- - - - - -
3,000,000
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Tahun 2015 Tahun 2016 New Inisiative
Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Harga Satuan
92,379,454 103,588,365
92,379,454 103,588,365
92,379,454 103,588,365
1,944,000 2,332,800
1,080,000 1,296,000
49,536 59,443
57,312 68,774
402,624 483,149
338,688 406,426
231,840 278,208
864,000 1,036,800
47,520 57,024
34,560 41,472
402,624 483,149
254,016 304,819
125,280 150,336
87,276,028 97,464,253
50,941,128 61,129,353
1,000,000 1,000,000
4,630 4,630
4,680 4,680
2,190 2,190
5,887,800 5,887,800
5,366,400 5,366,400
4,069,200 4,069,200
20,000,000 20,000,000
523,613 628,335
285,120 342,144
13,824 16,589
22,464 26,957
248,832 298,598
238,493 286,191
12,096 14,515
18,000 21,600
208,397 250,076
219,960 263,952
3,960 4,752
216,000 259,200
2,415,853 2,899,024
97,373 116,847
649,918 779,902
108,864 130,637
136,512 163,814
Tahun 2015 Tahun 2016 New Inisiative
Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Sasaran Alokasi (Ribuan Rp) Harga Satuan
49,169 59,003
98,129 117,755
176,636 211,963
152,015 182,418
117,870 141,444
167,040 200,448
662,328 794,794
ISU-ISU/PERMASALAHAN BIDANG PEKERJAAN UMUM DAN PERMUKIMAN
KONSULTASI REGIONAL KEMENTERIAN PEKERJAAN UMUM TAHUN 2012
FORMAT-1 KONREG 2012
PROVINSI: ACEH
Petunjuk Pengisian:
- Kolom 2: Diisi isu/permasalahan Bidang Pekerjaan Umum dan Permukiman yang membutuhkan penanganan melalui APBN
- Kolom 3: Diisi keterangan lokasi yang membutuhkan penanganan/pembangunan infrastruktur Bidang PU dan Permukiman
- Kolom 4: Diisi Kebutuhan Penanganan yang diperlukan. Menjadi dasar pengusulan yang lebih detil dengan menggunakan Format-2 Konreg
BAHAN PENYUSUNAN RENCANA KERJA (RENJA) KEMENTERIAN PEKERJAAN UMUM
2409.03 Pemeliharaan Berkala/ Rehabilitasi Jalan 21.62 59,300.0 - - 59,300.0 127.04 369,005
Pemeliharaan Berkala/ Rehabilitasi Jalan B.Aceh 026 12 K Jl. Teuku Umar (Banda Aceh) (2 jalur 2 arah) N - L L L √ 2007 KM - - - - 4.00 12,000 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan B.Aceh 026 13 K Jl. Cut Nyak Dien (Banda Aceh) (2 jalur 2 arah) N - L L L √ 2007 KM - - - - 2.20 6,600 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Besar 026 . . BTS. Kota Banda Aceh - Batas Aceh Barat (2 jalur 2 arah) N - L L L √ 2007 KM - - - - 1.50 4,500 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Abdya 033 . . Batas Aceh Barat (Km. 337) - Blang Pidie (BPLK) N - L L L √ 2011 KM 2.00 6,000.0 - 6,000.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Abdya 034 . . Blang Pidie - Batas Kota Tapaktuan (BPLK) N - L L L √ 2009 KM 0.50 1,500.0 - 1,500.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jalan B.Aceh 001 12 K Jl. T. Nya Arif (Banda Aceh) (2 jalur 2 arah) N - L L L √ 2012 KM - - - - 2.00 6,000 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan B.Aceh 001 11 K Jl. Krueng Raya (Banda Aceh) N 2 L L L √ 2007 KM - - - - 0.50 1,500 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan B.Aceh 002 13 K Jl. T. Imuem Lueng Bata (2 jalur 2 arah) N - L L L √ 2012 KM - - - - 5.54 16,620 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan B.Aceh 026 14 K Jl. Soekarno Hatta (Jalan Elak I) (2 jalur 2 arah) N - L L L √ 2012 KM - - - - 5.96 17,880 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan B.Aceh 026 15 K Jalan Elak II (2 jalur 2 arah) N 2 L L L √ 2007 KM - - - - 9.00 27,000 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Besar 040 11 K Lambaro - Blang Bintang (Jl. Cikditiro + Jl. Blang Bintang) (2 jalur 2 N - L L L √ 2007 KM - - - - 8.00 24,000 Y
arah)
Pemeliharaan Berkala/ Rehabilitasi Jalan B.Aceh 002 12 K BTS. Kota Banda Aceh - Lambaro (Banda Aceh) N - L L L √ 2012 KM - - - - 6.10 18,300 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Besar 003 . . KM.77 (Batas Pidie) - Sigli N - L L L √ 2009 KM - - - - 9.26 27,780 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Bireuen 006 . . BTS. Pidie - Bireuen N - L L L √ 2011 KM - - - - 10.00 30,000 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Pidie 005 . . Beureunun - Batas Aceh Utara N - L L L √ 2011 KM - - - - 8.93 26,790 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Utara 010 . . Panton Labu/Simpang (KM 328) - Peureulak (KM 392) N - L L L √ 2010 KM - - - - 10.44 31,320 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Bireuen 007 . . Bireuen - Bts. Kota Lhokseumawe N - L L L √ 2011 KM - - - - 4.63 13,890 Y
No. Kode Nama Output Kab./Kota No. Ruas Jalan Nama Ruas Jalan/ Kewen Nomor Lanjuta Kriteria Kelayakan Kriteria Kesiapan Satuan Rencana Tahun 2013 Kebutuhan Biaya Selesai
Output angan/ Urut Isu/ n (L) / FS AMDAL Kesiapan Kesiapa Volume Tahun 2014 Tahun 2015 Tahun 2016 sebelum/
Nama Ruas Jalan - Nama Jembatan/ Status Masalah Baru (Layak / (Layak / Lahan n DED Output Vol. Biaya Vol. Biaya (Rp) Vol. Biaya Vol. Biaya pada 2014
Nama Paket untuk Usulan Lainnya Jalan/J dalam (B) Tidak) Tidak) (Tahun) (tahun) Rp Rp PDP PHLN Jumlah (Rp) (Rp) (Y/T)
bt Form-1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Pemeliharaan Berkala/ Rehabilitasi Jalan A.Utara 011 . . Peureulak (KM 392) - BTS. Kota Langsa N - L L L √ 2011 KM - - - - 10.00 30,000 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Besar 001 . . Krueng Raya-Bts. Kota Banda Aceh N 2 L L L √ 2010 KM 3.00 9,000.0 - 9,000.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Besar 013 11 K Jl. AM Ibrahim (Jantho) N - L L L √ 2012 KM 3.22 8,050.0 - 8,050.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Tengah 019 . . Genting Gerbang-Batas Kota Takengon N 2 L L L √ 2009 KM - - - - 8.23 20,575 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Tengah 020 11 K Jl. Syah Utama (Takengon) N - L L L √ 2012 KM 0.90 2,250.0 - 2,250.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Besar 013 . . Seulimum-Jantho N - L L L √ 2007 KM 2.00 5,000.0 - 5,000.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A. Tengah 020 . . Batas Kota Takengon-Uwaq (Km.379) N 2 L L L √ 2009 KM 5.00 12,500.0 - 12,500.0 16.00 40,000 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Sabang 048 . . Keliling P. Weh (Balohan - Sabang) N - L L L √ 2011 KM 5.00 15,000.0 - 15,000.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Sabang 048 11 K Jalan T. Umar (Sabang) N - L L L √ 2011 KM - - - - 0.70 2,100 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Sabang 048 14 K Jalan Perdagangan (Sabang) N - L L L √ 2011 KM - - - - 0.70 2,100 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Sabang 048 12 K Jl. Diponegoro (Sabang) N - L L L √ 2011 KM - - - - 0.70 2,100 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Sabang 048 13 K Jl. AM. Ibrahim (Sabang) N - L L L √ 2011 KM - - - - 0.70 2,100 Y
Pemeliharaan Berkala/ Rehabilitasi Jalan Sabang 048 15 K Jl. Yos Sudarso (Sabang) N - L L L √ 2011 KM - - - - 1.95 5,850 Y
2409.04 Pemeliharaan Berkala/ Rehabilitasi Jembatan 168.30 23,914.8 - - 23,914.8 156.40 23,460
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Selatan 037 . . Rehab. Jembatan Lae lkan (Box Culvert) 01.037.010.0 N - L L L √ 2012 3 unit 900.0 - 900.0 - -
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Singkil 038 . . Rehab. Jembatan Desa Penanggalan (Box Culvert) Ruas Jalan N - L L L √ 2012 3 unit 900.0 - 900.0 - -
Penanggalan - Lipat Kajang
Pemeliharaan Berkala/ Rehabilitasi Jembatan Abdya BNA 337+600 Jembatan Alue Baneng (01.033.003.0) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan 0 BNA 621+600 Jembatan Lae Petal II (01.038.010.0) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Barat BNA 182+300 Jembatan Gogo I (ruas jalan KM. 125 - KM. 180) N - L L L √ 2011 M 25.00 4,100.0 - 4,100.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Barat BNA 259+000 Jembatan Lueng Gambee (01.030.006.0) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Besar BNA 018+300 Jembatan Kr. Dureung (01.001.007.0) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Besar BNA 020+700 Jembatan Kr. Kareng (01.001.009.0) N - L L L √ 2012 M - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Besar BNA 023+700 Jembatan Alue Geulumpang II (01.001.010.5) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Besar BNA 029+000 Jembatan Alue Ie Rehat (01.001.014.0) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BNA 327+900 Jembatan Alue Paya Daman (01.010.003.0) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BNA 340+900 Jembatan Alue Jengki (01.010.009.0) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BNA 341+500 Jembatan Alue Tanjung Seuma (01.010.008.0) N - L L L √ 2012 M - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BNA 342+200 Jembatan Alue Lipah II (01.010.013.0) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BNA 360+300 Jembatan Alue Tiram N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Pidie BNA 104+100 Jembatan Lueng Reubee (01.003.018.0) N - L L L √ 2012 M 4.50 175.5 - 175.5 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Tamiang BNA 470+800 Jembatan Kebun Tengah II (01.012.022.0) N - L L L √ 2012 M 34.00 5,100.0 - 5,100.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Tamiang BNA 473+500 Jembatan Kebun Tengah III (01.012.023.0) N - L L L √ 2012 M 16.00 2,400.0 - 2,400.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Pidie 015 Keumala-Geumpang (Ruas Jalan Seulimum - Keumala - Geumpang) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Tengah BNA 350+900 Jembatan Kr. Pelang (01.018.001.0) N - L L L √ 2012 M - - - 51.00 7,650 Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Tengah BNA 347+200 Jembatan Titi Merah (01.019.006.0) N - L L L √ 2012 M - - - - 49.00 7,350 Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Tengah BNA 356+200 Jembatan Tero I (01.020.006.0) N - L L L √ 2012 M - - - 6.10 915 Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Tengah BNA 387+600 Jembatan Kalokar (01.020.013.0) N - L L L √ 2012 M - - - - 4.00 600 Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Gayo Lues BNA 445+900 Jembatan Rikit Gaib (01.022.009.0) N - L L L √ 2012 M - - - - 11.00 1,650 Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BNA 289+800 Jembatan Alur Sukajadi (01.043.026.0) N - L L L √ 2012 M - - - - 19.50 2,925 Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BNA 280+900 Jembatan Weihni Rongka III (01.043.022.0) N - L L L √ 2012 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Gayo Lues BLK 004+175 Jembatan Lawe Natam N - L L L √ 2007 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Gayo Lues BLK 042+200 Jembatan Meluak I N - L L L √ 2008 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Gayo Lues BLK 051+600 Jembatan Waih Hilang N - L L L √ 2008 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Gayo Lues BLK 059+300 Jembatan Si Longal Longal N - L L L √ 2008 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Gayo Lues BLK 060+500 Jembatan Jeret Anom N - L L L √ 2008 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Gayo Lues TKG 142+500 Jembatan Atu Pelta N - L L L √ 2008 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Gayo Lues TKG 148+300 Jembatan Kendawi II N - L L L √ 2008 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan Gayo Lues TKG 148+000 Jembatan Kendawi I N - L L L √ 2008 M - - - - 10.00 1,500 Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tengah BNA 218+600 Jembatan Alue Bineung I N 3 L L L √ 2012 M - - - - 5.80 870 Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara ATG 008+700 Jembatan Lawe Kuning II (01.025.007.0) N 3 L L L √ 2008 M 19.60 2,584.0 - 2,584.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara ATG 009+300 Jembatan Lawe Kuning III (01.025.009.0) N 3 L L L √ 2008 M 12.80 1,891.0 - 1,891.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara ATG 010+300 Jembatan Lawe Kuning IIIa N 3 L L L √ 2008 M 6.90 456.0 - 456.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara ATG 010+800 Jembatan Lawe Kuning IV N 3 L L L √ 2008 M 10.80 1,021.0 - 1,021.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara ATG 011+200 Jembatan Rikit Bur (01.025.010.0) N 3 L L L √ 2008 M 6.90 835.0 - 835.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara ATG 099+400 Jembatan Kuta Pasir N 3 L L L √ 2008 M 6.00 662.0 - 662.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara ATG 014+600 Jembatan Sp. Kebun Seree N 3 L L L √ 2008 M 5.00 139.0 - 139.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara ATG 015+000 Jembatan Titi Pasir I (01.025.016.0) N 3 L L L √ 2008 M 6.00 831.0 - 831.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara ATG 015+050 Jembatan Titi Pasir II (01.025.017.0) N 3 L L L √ 2008 M 6.00 918.0 - 918.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A.Tenggara BNA 350+400 Jembatan Alur Weh Rusip N 3 L L L √ 2010 M 8.80 1,002.3 - 1,002.3 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BIR 11+800 Jembatan Alue Lhok Kala II N 3 L L L √ 2011 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BIR 12+800 Jembatan Alue Bruk I N 3 L L L √ 2011 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BIR 15+000 Jembatan Phon N 3 L L L √ 2011 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BIR 16+750 Jembatan Alue Teungoh N 3 L L L √ 2011 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BIR 20+600 Jembatan alue Bruk II N 3 L L L √ 2011 M - - - - - - Y
Pemeliharaan Berkala/ Rehabilitasi Jembatan A. Utara BIR 21+800 Jembatan Alue Entok N 3 L L L √ 2011 M - - - - - - Y
2409.05 Rekonstruksi/Peningkatan Struktur Jalan #REF! #VALUE! - #VALUE! #VALUE! #REF! #VALUE!
Rekonstruksi/Peningkatan Struktur Jalan A. Jaya 028 . . Pembebasan Lahan (Calang - Teunom) N - LS - 2,500.0 - 2,500.0 - 10,000 Y
Rekonstruksi/Peningkatan Struktur Jalan A. Selatan 037 . . Krueng Luas (KM 560) - Batas Sumut N 1 L L L √ 2012 KM - - - - 4.00 20,000 Y
Rekonstruksi/Peningkatan Struktur Jalan Nagan Raya 032 . . SIMPANG PEUT - BTS ACEH SELATAN (KM.337) 2 jalur N 2 L L L √ 2011 KM 1.50 15,000.0 - 15,000.0 - - Y
Rekonstruksi/Peningkatan Struktur Jalan A. Besar 001 . . Krueng Raya-Bts. Kota Banda Aceh N 2 L L L √ 2012 KM 1.50 7,500.0 - 7,500.0 - - Y
Rekonstruksi/Peningkatan Struktur Jalan Pidie 003 11 K Jl T. Chik Di Tiro (Sigli) N - L L L √ 2012 KM 2.00 10,000.0 - 10,000.0 - - Y
Rekonstruksi/Peningkatan Struktur Jalan A. Utara 008 . . Krueng Mane - Bukit Rata N 2 L L L √ 2012 KM 4.00 20,000.0 - 20,000.0 12.00 60,000 Y
Rekonstruksi/Peningkatan Struktur Jalan Pidie 005 . . Beureunun - Batas Aceh Utara N 1 L L L √ 2008 KM 1.50 7,500.0 - 7,500.0 - - Y
Pemeliharaan Berkala/ Rehabilitasi Jalan A.Tamiang 012 . . Peureulak (KM 392) - BTS. Kota Langsa N 1 L L L √ 2011 KM 1.13 5,650.0 - 5,650.0 - - Y
Rekonstruksi/Peningkatan Struktur Jalan A.Tamiang 012 . . BTS. Kota Langsa - BTS. Prov Sumut N 1 L L L √ 2011 KM 5.00 25,000.0 - 25,000.0 - - Y
Rekonstruksi/Peningkatan Struktur Jalan A. Tengah 019 11 K Jl. Yos Sudarso (Takengon) N - L L L √ 2012 KM 1.00 4,500.0 - 4,500.0 - - Y
Rekonstruksi/Peningkatan Struktur Jalan Pidie P.009.1 . . Beureunun - Keumala N 2 L L L √ 2012 KM 6.67 30,000.0 - 30,000.0 6.67 30,000 Y
No. Kode Nama Output Kab./Kota No. Ruas Jalan Nama Ruas Jalan/ Kewen Nomor Lanjuta Kriteria Kelayakan Kriteria Kesiapan Satuan Rencana Tahun 2013 Kebutuhan Biaya Selesai
Output angan/ Urut Isu/ n (L) / FS AMDAL Kesiapan Kesiapa Volume Tahun 2014 Tahun 2015 Tahun 2016 sebelum/
Nama Ruas Jalan - Nama Jembatan/ Status Masalah Baru (Layak / (Layak / Lahan n DED Output Vol. Biaya Vol. Biaya (Rp) Vol. Biaya Vol. Biaya pada 2014
Nama Paket untuk Usulan Lainnya Jalan/J dalam (B) Tidak) Tidak) (Tahun) (tahun) Rp Rp PDP PHLN Jumlah (Rp) (Rp) (Y/T)
bt Form-1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Rekonstruksi/Peningkatan Struktur Jalan A. Tengah 015 . . Keumala-Geumpang (penang. Permanen akibat banjir bandang N 2 L L L √ 2011 KM 12.22 55,000.0 - 55,000.0 6.67 30,000 Y
tahun 2011 dan tahun 2012)
Rekonstruksi/Peningkatan Struktur Jalan A. Tengah 018 . . Pameu-Genting Gerbang N 2 L L L √ 2012 KM 3.00 13,500.0 - 13,500.0 3.00 13,500 Y
Rekonstruksi/Peningkatan Struktur Jalan Gayo Lues 019 . . Genting Gerbang-Batas Kota Takengon N 2 L L L √ 2012 KM 1.10 4,950.0 - 4,950.0 - - Y
Rekonstruksi/Peningkatan Struktur Jalan #REF! #REF! ### ### #REF! N 1 L L L √ 2012 KM #REF! #VALUE! #VALUE! #VALUE! #REF! #VALUE! Y
Rekonstruksi/Peningkatan Struktur Jalan Gayo Lues 023, 024 . . Blangkejeren-Laweaunan N 1 L L L √ 2012 KM 8.60 43,000.0 - 43,000.0 9.33 42,000 Y
Rekonstruksi/Peningkatan Struktur Jalan Gayo Lues 024 . . Laweaunan-Batas Kota Kutacane N 1 L L L √ 2011 KM 5.00 22,500.0 - 22,500.0 5.00 22,500 Y
Rekonstruksi/Peningkatan Struktur Jalan Sabang 048 Keliling P. Weh (Balohan - Sabang) N 2 L L L √ 2011 KM 5.00 25,000.0 - 25,000.0 12.00 60,000 Y
Pembangunan Jembatan Baru Subulussalam BNA 600+800 Jembatan Sibelu/Belageng (01.037.005.0) N 3 B L L √ 2010 M - - - - 40.00 10,000 Y
Pembangunan Jembatan Baru Aceh jaya BNA 154+400 Jembatan Kuala Meurisi (01.028.018.0) N 3 B L L √ 2011 M - - - - 85.80 18,000 Y
Pembangunan Jembatan Baru A. Barat BNA 182+300 Jembatan Kr. Sabee (01.028.019.0) N 3 B L L √ 2011 M - - - - 134.40 55,500 Y
Pembangunan Jembatan Baru Subulussalam BNA 580+200 Jembatan Kr. Singgersing (01.037.002.0) N 3 B L L √ 2011 M - - - - - - Y
Pembangunan Jembatan Baru Banda Aceh BNA 5+400 Jembatan Kr. Cut (01.001.003.0) N 3 B L L √ 2006 M 300.00 22,500.0 - 22,500.0 300.00 52,500 Y
Pembangunan Jembatan Baru Gayo Lues BNA 492+000 Jembatan Pungke Jaya N 3 B L L √ 2010 M 35.00 8,392.8 - 8,392.8 - - Y
2409.09 Pelebaran Jalan #REF! #VALUE! 2,400.0 #VALUE! #VALUE! #REF! #VALUE!
Pelebaran Jalan A. Jaya 027 . . KM 125 - KM 180 (CALANG - TEUNOM) seksi III N 1 L L L 2012 2010 KM - - - - 5.00 22,500 Y
Pelebaran Jalan A. Selatan 035 . . Batas Kota Tapaktuan - Bakongan (Km. 510) (Batu Hitam) N 1 L L L - 2009 KM 3.50 15,750.0 - 15,750.0 2.50 11,250 Y
Pelebaran Jalan A. Selatan 035 . . Batas Kota Tapaktuan - Bakongan (Km. 510) (Kota Fajar) jalan 2 jalur N 1 L L L 2012 2009 KM - - - - 2.00 9,000 Y
Pelebaran Jalan A. Selatan 035 . . BTS. KOTA TAPAK TUAN - BAKONGAN (KM 510) N 1 L L L - 2011 KM 10.00 50,000.0 - 50,000.0 10.00 50,000 Y
Pelebaran Jalan A. Selatan 036 . . BAKONGAN (KM 510) - KRUENG LUAS (KM 560 N 1 L L L - 2012 KM - - - - 3.70 16,650 Y
Pelebaran Jalan A. Selatan 037 . . KRUENG LUAS (KM 560) - BATAS SUMUT (peningkatan kapasitas) N 1 L L L - 2012 KM 3.60 16,200.0 - 16,200.0 - - Y
Pelebaran Jalan A. Singkil 038 . . PENANGGALAN - LIPAT KAJANG (peningkatan kapasitas) N 1 L L L - 2011 KM - - - - 5.00 25,000 Y
Pelebaran Jalan A. Singkil 039 . . LIPAT KAJANG - LAWE PARIS - BTS. PROV. SUMUT (peningkatan N 1 L L L - 2012 KM - - - - 5.00 22,500 Y
kapasitas)
Pelebaran Jalan B.Aceh 002 . . BTS. Kota Banda Aceh - KM.77 (Batas Pidie) N 1 L L L - 2012 KM 5.50 24,750.0 - 24,750.0 6.70 30,150 Y
Pelebaran Jalan 0 . . . Pengadaan Tanah jalan Lintas Timur N - L L L - - 2,500.0 - 2,500.0 - - Y
Pelebaran Jalan #REF! #REF! ### ### #REF! N 1 L L L - 2012 KM #REF! #VALUE! #VALUE! #VALUE! #REF! #VALUE! Y
Pelebaran Jalan Bireuen 006 . . BTS. Pidie - Bireuen N 1 L L L √ 2008 KM 1.14 5,130.0 - 5,130.0 - - Y
Pelebaran Jalan A.Utara 009 . . BTS. Kota Lhokseumawe - Panton Labu/Simpang seksi 1 (4 lajur) N 1 L L L - 2010 KM 5.36 24,120.0 - 24,120.0 - - Y
Pelebaran Jalan A.Utara 009 . . BTS. Kota Lhokseumawe - Panton Labu/Simpang seksi 2 N 1 L L L - 2012 KM - - - - 7.00 31,500 Y
Pelebaran Jalan A.Utara 010 . . Panton Labu/Simpang (Km. 328) - Peureulak (Km. 392) N 1 L L L - 2008 KM 5.00 22,500.0 - 22,500.0 8.50 38,250 Y
Pelebaran Jalan A.Utara 011 . . Peureulak (KM 392) - BTS. Kota Langsa N 1 L L L - 2011 KM 5.50 24,750.0 - 24,750.0 11.00 49,500 Y
Pelebaran Jalan Pidie 005 . . Beureunun - Batas Aceh Utara N 1 L L L - 2008 KM - - - - 8.00 36,000 Y
Pelebaran Jalan Pidie 004 . . BTS. Kota Sigli - Beureunun N 1 L L L - 2008 KM 4.94 22,230.0 - 22,230.0 2.00 9,000 Y
No. Kode Nama Output Kab./Kota No. Ruas Jalan Nama Ruas Jalan/ Kewen Nomor Lanjuta Kriteria Kelayakan Kriteria Kesiapan Satuan Rencana Tahun 2013 Kebutuhan Biaya Selesai
Output angan/ Urut Isu/ n (L) / FS AMDAL Kesiapan Kesiapa Volume Tahun 2014 Tahun 2015 Tahun 2016 sebelum/
Nama Ruas Jalan - Nama Jembatan/ Status Masalah Baru (Layak / (Layak / Lahan n DED Output Vol. Biaya Vol. Biaya (Rp) Vol. Biaya Vol. Biaya pada 2014
Nama Paket untuk Usulan Lainnya Jalan/J dalam (B) Tidak) Tidak) (Tahun) (tahun) Rp Rp PDP PHLN Jumlah (Rp) (Rp) (Y/T)
bt Form-1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Pelebaran Jalan Bireuen 007 . . Bireuen - Bts. Kota Lhokseumawe N 1 L L L - 2008 KM 5.50 24,750.0 - 24,750.0 - - Y
Pelebaran Jalan A.Tamiang 012 . . BTS. Kota Langsa - BTS. Prov Sumut seksi 2 N 1 L L L - 2011 KM 5.00 50,000.0 - 50,000.0 3.00 30,000 Y
Pelebaran Jalan A. Tengah 019 . . Genting Gerbang-Batas Kota Takengon N - L L L - 2012 KM - - - - 5.00 22,500 Y
Pelebaran Jalan A. Tengah 019 . . Pengadaan Tanah Lintas Tengah (Bireuen - Takengon) N - L L L - - 7,500.0 - 7,500.0 - - Y
Pelebaran Jalan A.Tenggara 025 . . Batas Kota Kutacane-Batas Prov. Sumut N 1 L L L - 2012 KM 5.50 19,250.0 - 19,250.0 5.50 19,250 Y
Pelebaran Jalan A.Tengah 042 . . Bireuen - Batas Aceh Tengah N 1 L L L - 2011 KM 6.00 21,000.0 - 21,000.0 9.71 34,000 Y
Pelebaran Jalan A.Tengah 043 . . Batas Aceh Utara - Batas Kota takengon Seksi I N 1 L L L - 2011 KM 7.00 24,500.0 - 24,500.0 14.00 49,000 Y
Pelebaran Jalan A.Tengah 043 . . Batas Aceh Utara - Batas Kota takengon Seksi II N 1 L L L - 2011 KM 7.00 24,500.0 - 24,500.0 14.00 49,000 Y
Pelebaran Jalan Gayo Lues 022 . . JALAN TAKENGON - BLANGKAJEREN SEKSI I (SP. KRAFT- N - B L L - JICA KM 13.34 800.0 40,000.0 40,800.0 14.29 50,000 Y
BLANGKEJEREN)
Pelebaran Jalan Gayo Lues 022 . . JALAN TAKENGON - BLANGKAJEREN SEKSI II (BTS.A.TENGAH- N - B L L - JICA KM 13.34 800.0 40,000.0 40,800.0 14.29 50,000 Y
BLANGKEJEREN)
Pelebaran Jalan Gayo Lues P.042,064 JALAN TAKENGON - BLANGKAJEREN SEKSI III (KEBAYAKAN- N - B L L - JICA KM 13.34 800.0 40,000.0 40,800.0 14.29 50,000 Y
SP.KRAFT)
No. Kode Nama Output Kab./Kota No. Ruas Jalan Nama Ruas Jalan/ Kewen Nomor Lanjuta Kriteria Kelayakan Kriteria Kesiapan Satuan Rencana Tahun 2013 Kebutuhan Biaya Selesai
Output angan/ Urut Isu/ n (L) / FS AMDAL Kesiapan Kesiapa Volume Tahun 2014 Tahun 2015 Tahun 2016 sebelum/
Nama Ruas Jalan - Nama Jembatan/ Status Masalah Baru (Layak / (Layak / Lahan n DED Output Vol. Biaya Vol. Biaya (Rp) Vol. Biaya Vol. Biaya pada 2014
Nama Paket untuk Usulan Lainnya Jalan/J dalam (B) Tidak) Tidak) (Tahun) (tahun) Rp Rp PDP PHLN Jumlah (Rp) (Rp) (Y/T)
bt Form-1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
2409.14 Pengumpulan Data Jalan Dan Jembatan #REF! - #REF! #REF!
Wilayah I #REF! #REF! #REF!
Wilayah II #REF! #REF! #REF!
P2JN 1,350.0 1,350.0 1,350.0
-
2409.15 Perencanaan Teknis Dan Pengawasan Teknis 72,385.5 - 72,385.5 78,778.4
Jalan Dan Jembatan
P2JN -
Pengawasan/Supervisi Konstruksi 4 34,411.1 34,411.1 42,450.9
Pengawasan/Supervisi Konstruksi (SKPD) 4 1,000.0 1,000.0 1,000.0
Pengawasan Teknik Jalan lIntas Timur (MYC 2012-2014) 4 2,384.0 2,384.0 0.7
Pengawasan Teknik Jalan lIntas Tengah (MYC 2012-2014) 4 1,495.7 1,495.7 1.1
Pengawasan Teknik Jalan lIntas Barat (MYC 2012-2014) 4 2,879.1 2,879.1 2.2
Pengawasan Rencana MYC Lintas Timur (MYC 2013-2014) 4 3,925.2 3,925.2 5,887.8
Pengawasan Rencana MYC Lintas Tengah (MYC 2013-2014) 4 3,577.6 3,577.6 5,366.4
Pengawasan Rencana MYC Non Lintas dan Jembatan (MYC 2013- 4 2,712.8 2,712.8 4,069.2
2014)
Penyusunan Detail Desain 20,000.0 20,000.0 20,000.0
-
2409.18 Monitoring dan Evaluasi Pelaksanaan Jalan dan 363.6 - 363.6 363.6
Jembatan
P2JN - -
Monitoring dan Evaluasi - - -
A. Monitoring Jalan Nasional dan Provinsi - -
- ATK dan Bahan komputer 9.6 9.6 9.6
- Penggandaan, penyusunan laporan dan pengiriman surat dinas 15.6 15.6 15.6
- Perjalanan dinas daerah, transport dan uang harian 172.8 172.8 172.8
B. Monitoring Jalan Kabupaten/DAK - -
- ATK dan Bahan komputer 8.4 8.4 8.4
- Penggandaan, penyusunan laporan, pengiriman surat dinas dan 12.5 12.5 12.5
cetak foto
- Perjalanan dinas daerah, transport dan uang harian 144.7 144.7 144.7
-
-
-
2409.23 Pemenuhan Kebutuhan Prasarana & Sarana #REF! - #REF! #REF!
Perkantoran
SKPD #REF! #REF! #REF!
Wilayah I #REF! #REF! #REF!
Wilayah II #REF! #REF! #REF!
P2JN 152.8 152.8 152.8
Pengadaan tanah untuk kantor (3 satker) 7,500.0 7,500.0 7,500.0
-
2409.24 Layanan Perkantoran #REF! - #REF! #REF!
Wilayah I #REF! #REF! #REF!
Wilayah II #REF! #REF! #REF!
P2JN 1,677.7 1,677.7 1,677.7
Petunjuk Pengisian:
- Kolom 1: Nomor urut usulan per output
- Kolom 2 & 3: diisi sesuai kodefikasi dan nama Output kegiatan (tabel terlampir)
- Kolom 4: Diisi lokasi kabupaten/Kotamadya
- Kolom 5: Diisi Nomor Ruas Jalan
- Kolom 6: Diisi Nama Ruas Jalan (untuk usulan jalan)
Diisi Nama Ruas Jalan - Nama Jembatan (untuk usulan jembatan)
Diisi Nama paket, diluar usulan Jalan dan Jembatan (tidak perlu mengisi kolom 7-12)
- Kolom 7 : Diisi Kewenangan/ Status Jalan sesuai dengan SK Menteri PU No.567 Tahun 2010
- Kolom 8 : Diisi Nomor Urut Isu/Masalah yang terkait yang tercantum dalam Format-1
- Kolom 9 : Diisi kode "B" untuk usulan baru yang belum dialokasikan di tahun sebelumnya pada output pembangunan Jalan baru/Jembatan baru/Flyover/underpass/terowongan & Pembangunan Jalan/Jembatan di kawasan strategis, selainnya diisi kode "L"
- Kolom 10 dan 11: Diisi Layak atau Tidaknya Feasibility Study (FS) dan Analisis Mengenai Dampak Lingkungan (Amdal) hanya jika kolom 8 terisi kode "B"
- Kolom 12 dan 13: Diisi tahun siapnya lahan yang dibutuhkan dan tahun selesainya penyusunan DED khusus pada output Rekonstruksi Jalan, Pelebaran Jalan, Pembangunan Jalan/Jembatan Baru, Flyover/Underpass/Terowongan & Pembangunan Jalan/Jembatan di kawasan Strategis
- Kolom 14: Diisi sesuai satuan Volume Output (tabel terlampir)
- Kolom 15, 16, 17, 18 dan 19: Diisi volume beserta biaya pelaksanaan tahun 2013 (biaya dalam juta rupiah) untuk rupiah murni, rupiah pendamping dan PHLN (loan yang berjalan)
- Kolom 20 dan 21: Diisi volume dan biaya (dalam juta rupiah) untuk pelaksanaan pekerjaan tahun 2014
- Kolom 22 dan 23: Diisi volume dan biaya (dalam juta rupiah) untuk pelaksanaan pekerjaan tahun 2015
- Kolom 24 dan 25: Diisi volume dan biaya (dalam juta rupiah) untuk pelaksanaan pekerjaan tahun 2016
- Kolom 26: Diisi hanya untuk pekerjaan baru "B" sesuai kolom 8, dengan isian jawaban Ya diisi "Y" dan untuk jawaban tidak sesuai diisi "T" ; dan akan diverifikasi oleh Petugas Desk
BAHAN PENYUSUNAN RENCANA KERJA (RENJA) KEMENTERIAN PEKERJAAN UMUM - INSIATIF BARU (PERCEPATAN)
PROGRAM : (033.04.08) Penyelenggaraan Jalan
FORMAT- 3 KONREG 2012 (NEW INITIATIVE)
KEGIATAN : (2409) Pelaksanaan Preservasi dan Peningkatan Kapasitas Jalan Nasional
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
2409.05 Rekonstruksi/Peningkatan Struktur Jalan 6.50 32,500 32,500 6.50 32,500 4.00 20,000 3.00 15,000
A. Besar P.028 Jalan Blang Bintang - Krueng Raya Strat.Nas 2 B Layak Layak - 2012 KM 2.50 12,500 12,500 2.5 12,500 Y
Simeulue 053 Sinabang - Sibigo Strat.Nas 2 B Layak Layak - 2011 KM 4.00 20,000 20,000 4.0 20,000 4.0 20,000 3.0 15,000 Y
2409.08 Pembangunan Jembatan Baru 800.00 45,500 45,500 ### 45,500 ### 20,500
Banda Aceh BNA 6+000 Jembatan Lamnyong (penggandaan) Strat.Nas 3 B Layak Layak 2011 M 300.00 20,500 20,500 300 20,500 300 20,500 Y
A.Besar NS Fly Over Santan Strat.Nas 3 L Layak Layak 2012 M 500.00 25,000 25,000 500 25,000 Y
Petunjuk Pengisian:
- Kolom 1: Nomor urut usulan per output
- Kolom 2 & 3: diisi sesuai kodefikasi dan nama Output kegiatan (tabel terlampir)
- Kolom 4: Diisi lokasi kabupaten/Kotamadya
- Kolom 5: Diisi Nomor Ruas Jalan
- Kolom 6: Diisi Nama Ruas Jalan (untuk usulan jalan)
Diisi Nama Ruas Jalan - Nama Jembatan (untuk usulan jembatan)
Diisi Nama paket, diluar usulan Jalan dan Jembatan (tidak perlu mengisi kolom 7-12)
- Kolom 7 : Diisi Kewenangan/ Status Jalan sesuai dengan SK Menteri PU No.567 Tahun 2010
- Kolom 8 : Diisi Nomor Urut Isu/Masalah yang terkait yang tercantum dalam Format-1
- Kolom 9 : Diisi kode "B" untuk usulan baru yang belum dialokasikan di tahun sebelumnya pada output pembangunan Jalan baru/Jembatan baru/Flyover/underpass/terowongan & Pembangunan Jalan/Jembatan di kawasan strategis, selainnya diisi kode "L"
- Kolom 10 dan 11: Diisi Layak atau Tidaknya Feasibility Study (FS) dan Analisis Mengenai Dampak Lingkungan (Amdal) hanya jika kolom 8 terisi kode "B"
- Kolom 12 dan 13: Diisi tahun siapnya lahan yang dibutuhkan dan tahun selesainya penyusunan DED khusus pada output Rekonstruksi Jalan, Pelebaran Jalan, Pembangunan Jalan/Jembatan Baru, Flyover/Underpass/Terowongan & Pembangunan Jalan/Jembatan di kawasan Strategis
- Kolom 14: Diisi sesuai satuan Volume Output (tabel terlampir)
- Kolom 15, 16, 17, 18 dan 19: Diisi volume beserta biaya pelaksanaan tahun 2013 (biaya dalam juta rupiah) untuk rupiah murni, rupiah pendamping dan PHLN (loan yang berjalan)
- Kolom 20 dan 21: Diisi volume dan biaya (dalam juta rupiah) untuk pelaksanaan pekerjaan tahun 2014
- Kolom 22 dan 23: Diisi volume dan biaya (dalam juta rupiah) untuk pelaksanaan pekerjaan tahun 2015
- Kolom 24 dan 25: Diisi volume dan biaya (dalam juta rupiah) untuk pelaksanaan pekerjaan tahun 2016
- Kolom 26: Diisi hanya untuk pekerjaan baru "B" sesuai kolom 8, dengan isian jawaban Ya diisi "Y" dan untuk jawaban tidak sesuai diisi "T" ; dan akan diverifikasi oleh Petugas Desk
HARGA SATUAN
Lintas Barat
WILAYAH I 489,471,500
2409 01 Pemeliharaan Rutin Jalan 722.52 21,425,600
2409 02 Pemeliharaan Rutin Jembatan 8,943.50 19,787,800
2409 03 Pemeliharaan Berkala/Rehabilitasi Jalan 5.50 4,000,000
2409 04 Pemeliharaan Berkala/Rehabilitasi Jembatan 525.90 44,580,000
2409 05 Rekonstruksi/Peningkatan Struktur Jalan 41.59 177,570,000
2409 06 Penggantian Jembatan 45.30 20,900,000
2409 08 Pembangunan Jembatan Baru 38.00 11,250,000
2409 09 Pelebaran Jalan 44.14 166,402,000
Pengadaan Tanah (untuk pelaksanaan Jalan wil.I dan wil II) 4,000,000
2409 14 Pengumpulan Data Jalan Dan Jembatan 4,000,000
2409 23 Pemenuhan Kebutuhan Prasarana & Sarana Perkantoran 3,500,000
+PPK
KODE KEGIATAN SASARAN ALOKASI (Ribuan Rp)
RUAS LOKASI
KGIAT INDKTOR KM/M MURNI
2409 24 Layanan Perkantoran 12,056,100
WILAYAH-I 489,471,500
INDUK 23,556,100
PPK-02 (Km.77 - Sigli - Beureunun - Bireuen) 141.57 141.57 57,305,300
PPK-03 (Bireuen - Lhokseumawe) 141.64 141.64 58,854,350
PPK-04 (Panton Labu/Simpang - Langsa) 119.72 119.72 58,644,350
PPK-04 A (Langsa - Bts. Sumut) 59.29 59.29 81,093,300
PPK-05 (Bireuen - Takengon) 94.24 94.24 46,705,000
PPK-07(Pameu - Genting Gerbang - Takengon) 69.82 69.82 30,988,400
PPK-07 A(Takengon - Bts. Gayo Lues) 92.26 92.26 36,518,500
PPK-08 (Bts. Aceh Tengah - Laweaunan) 124.64 124.64 56,798,800
PPK-08 A (Laweaunan - Bts. Prov. Sumut) 73.01 73.01 39,007,400
+PPK
KODE KEGIATAN SASARAN ALOKASI (Ribuan Rp)
RUAS LOKASI
KGIAT INDKTOR KM/M MURNI
PPK-02 57,305,300
01 Pemeliharaan Rutin Jalan 132.70 3,317,500
TIMUR KM. 77 (Batas Pidie) - BTS. Kota Sigli 003 Pidie 23.60 590,000
TIMUR Jl. Cikditiro (Sigli) 003 11 K Pidie 0.90 22,500
TIMUR BTS. Kota Sigli - Beureunun 004 Pidie 10.00 250,000
TIMUR Jl. AM. Ibrahim (Sigli) 004 11 K Pidie 2.70 67,500
TIMUR Beureunun - BTS. Aceh Utara 005 Pidie Jaya 49.70 1,242,500
TIMUR BTS. Pidie - Bireuen 006 Bireuen 45.80 1,145,000
PPK-03 58,854,350
01 Pemeliharaan Rutin Jalan 125.51 3,137,750
TIMUR Bireuen - BTS. Kota Lhokseumawa 007 Bireuen 48.32 1,208,000
TIMUR Jl. Raya Banda Aceh (Lhokseumawe) 007 11 K L. Seumawe 7.52 188,000
TIMUR Krueng Mane - Bukit Rata 008 A. Utara 13.50 337,500
TIMUR BTS. Kota Lhokseumawe - Panton Labu/Simpang (KM 328) 009 L. Seumawe 53.59 1,339,750
TIMUR Jl. Raya Medan (Lhokseumawe) 009 11 K L. Seumawe 0.40 10,000
TIMUR SP. KR. Geukeuh - Pel. Lhokseumawe 041 L.Seumawe 2.18 54,500
PPK-04 58,644,350
01 Pemeliharaan Rutin Jalan 104.31 2,607,750
+PPK
KODE KEGIATAN SASARAN ALOKASI (Ribuan Rp)
RUAS LOKASI
KGIAT INDKTOR KM/M MURNI
TIMUR Panton Labu/Simpang (KM 328) - Peureulak (KM 392) 010 A.Utara 53.60 1,340,000
TIMUR Peureulak (KM 392) - BTS. Kota Langsa 011 A.Utara 42.50 1,062,500
TIMUR Jl. AM. Ibrahim (Langsa) 011 11 K Langsa 4.65 116,250
TIMUR Jl. Ahmad Yani (Langsa) 011 12 K Langsa 3.56 89,000
PPK-04 A 81,093,300
01 Pemeliharaan Rutin Jalan 56.78 1,419,500
TIMUR BTS. Kota Langsa - BTS. Prov Sumut 012 A.Tamiang 46.10 1,152,500
TIMUR Jl. Agus Salim (Langsa) 012 11 K Langsa 1.45 36,250
TIMUR BTS. Kota Langsa - Kuala Langsa 047 A. Timur 4.27 106,750
TIMUR Jl. Kuala Langsa (Langsa) 047 11 K Langsa 4.96 124,000
+PPK
KODE KEGIATAN SASARAN ALOKASI (Ribuan Rp)
RUAS LOKASI
KGIAT INDKTOR KM/M MURNI
06 Penggantian Jembatan 29.60 12,450,000
TIMUR Jembatan Titi Kuning BNA 413+250 A. Timur 413+250 19.60 6,000,000
TIMUR Jembatan Kebon III (Bna 481 +700) (01.012.026.0) 481+700 7.00 5,200,000
TIMUR Jembatan Km. 2 Langsa - Kuala Langsa (box culvert 3 x 12m) 047 Langsa 1+300 3.00 1,250,000
PPK-05 46,705,000
01 Pemeliharaan Rutin Jalan 95.55 3,867,000
TENGH Bireuen - Batas Aceh Tengah 042 A.Tengah 33.35 2,001,000
TENGH Batas Aceh Utara - Batas Kota takengon 043 A.Tengah 61.00 1,830,000
TENGH Jl. Raya Bireun (Takengon) 043 11 K A. Tengah 1.20 36,000
+PPK
KODE KEGIATAN SASARAN ALOKASI (Ribuan Rp)
RUAS LOKASI
KGIAT INDKTOR KM/M MURNI
PPK-07 30,988,400
01 Pemeliharaan Rutin Jalan 28.20 1,692,000
TENGH Pameu-Genting Gerbang 018 A. Tengah 13.00 780,000
TENGH Genting Gerbang-Batas Kota Takengon 019 A. Tengah 15.20 912,000
PPK-07 A 36,518,500
01 Pemeliharaan Rutin Jalan 85.67 2,570,100
TENGH Batas Kota Takengon-Uwaq (Km.379) 020 A. Tengah 68.11 2,043,300
TENGH Uwaq (Km.379)-Batas Aceh Tenggara (Km. 415) 021 Gayo Lues 17.56 526,800
PPK-08 56,798,800
01 Pemeliharaan Rutin Jalan 44.70 1,341,000
TENGH Batas Aceh Tenggara (Km. 415)- Blangkejeren 022 Gayo Lues 23.80 714,000
TENGH Blangkejeren-Laweaunan 023 Gayo Lues 20.90 627,000
PPK-08 A 39,007,400
01 Pemeliharaan Rutin Jalan 49.10 1,473,000
TENGH Laweaunan-Batas Kota Kutacane 024 A.Tenggara 25.50 765,000
TENGH Jl. Ahmad Yani (Kotacane) 024 11 K A.Tenggara 0.30 9,000
TENGH Batas Kota Kutacane-Batas Prov. Sumut 025 A.Tenggara 19.80 594,000
TENGH Jl. Iskandar Muda (Kotacane) 025 11 K A.Tenggara 3.50 105,000
+PPK
(Ribuan Rp)
BIAYA (baseline)
PHLN
35,053,000 524,524,500
- 255,897,300
- 10,482,500
- 11,718,800
- 4,000,000
- 27,300,000
- 59,194,000
- 18,450,000
1,250,000
- 123,502,000
35,053,000 249,071,100
- 10,943,100
- 8,069,000
- -
- 17,280,000
- 118,376,000
- 2,450,000
- 10,000,000
35,053,000 77,953,000
- 4,000,000
- 4,000,000
- 3,500,000
- 12,056,100
35,053,000 524,524,500
- 21,425,600
- 19,787,800
- 4,000,000
- 44,580,000
- 177,570,000
- 20,900,000
- 11,250,000
35,053,000 201,455,000
4,000,000
4,000,000
3,500,000
+PPK
(Ribuan Rp)
BIAYA (baseline)
PHLN
12,056,100
35,053,000 524,524,500
- 23,556,100
- 57,305,300
- 58,854,350
- 58,644,350
81,093,300
- 46,705,000
11,667,666 42,656,066
11,717,667 48,236,167
11,667,667 68,466,467
39,007,400
35,053,000 524,524,500
23,556,100
4,000,000
- 4,000,000
- 3,500,000
- 12,056,100
+PPK
(Ribuan Rp)
BIAYA (baseline)
PHLN
57,305,300
3,317,500
590,000
22,500
250,000
67,500
1,242,500
1,145,000
4,221,800
- 921,200
- 332,400
1,734,200
1,234,000
34,194,000
7,500,000
20,294,000
6,400,000
- 15,572,000
15,572,000
58,854,350
3,137,750
1,208,000
188,000
337,500
1,339,750
10,000
54,500
3,186,600
- 970,000
- 425,000
- 1,583,600
208,000
4,000,000
- 4,000,000
600,000
209,720
178,490
+PPK
(Ribuan Rp)
BIAYA (baseline)
PHLN
211,790
15,000,000
15,000,000
1,250,000
1,250,000
- 31,680,000
- 12,250,000
- 13,500,000
- 5,930,000
58,644,350
2,607,750
+PPK
(Ribuan Rp)
BIAYA (baseline)
PHLN
1,340,000
1,062,500
116,250
89,000
2,686,600
- 1,577,400
- 1,109,200
6,100,000
4,550,000
1,550,000
10,000,000
10,000,000
6,000,000
4,750,000
1,250,000
- 31,250,000
17,500,000
13,750,000
81,093,300
1,419,500
1,152,500
36,250
106,750
124,000
1,623,800
- 1,439,200
- 184,600
20,600,000
2,800,000
2,700,000
3,400,000
2,100,000
2,200,000
5,700,000
1,700,000
+PPK
(Ribuan Rp)
BIAYA (baseline)
PHLN
12,450,000
6,000,000
5,200,000
1,250,000
- 45,000,000
45,000,000
46,705,000
3,867,000
2,001,000
1,830,000
36,000
3,388,000
- 1,572,000
- 1,816,000
12,000,000
1,350,000
1,350,000
1,450,000
1,400,000
3,750,000
1,350,000
1,350,000
2,450,000
2,450,000
- 25,000,000
25,000,000
+PPK
(Ribuan Rp)
BIAYA (baseline)
PHLN
11,667,666 42,656,066
1,692,000
780,000
912,000
620,400
- 347,400
- 273,000
27,876,000
23,876,000
4,000,000
11,667,666 12,467,666
11,667,666 12,467,666
11,717,667 48,236,167
2,570,100
2,043,300
526,800
648,400
347,000
301,400
32,500,000
20,000,000
12,500,000
11,717,667 12,517,667
11,717,667 12,517,667
11,667,667 68,466,467
1,341,000
714,000
627,000
1,657,800
924,400
- 733,400
43,000,000
43,000,000
+PPK
(Ribuan Rp)
BIAYA (baseline)
PHLN
10,000,000
10,000,000
11,667,667 12,467,667
11,667,667 12,467,667
39,007,400
1,473,000
765,000
9,000
594,000
105,000
1,754,400
- 1,169,000
- 585,400
5,280,000
1,000,000
600,000
1,100,000
900,000
1,680,000
15,000,000
15,000,000
- 15,500,000
15,500,000
+PPK
STRUKTUR RENCANA REVISI I DIPA
TAHUN ANGGARAN 2014
KD.SATKER : 498574
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI ACEH
PROVINSI : ACEH
PROGRAM : TAHUN ANGGARAN 2014
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
2409 Pelaksanaan Preservasi dan Peningkatan Kapasitas Jalan Nasional 1.00 LS 6,423,248 6,423,248 1.00 LS 6,488,248 6,488,248
2409.14 Pengumpulan Data Jalan Dan Jembatan 2.00 Dok 2,571,460 2,571,460 2.00 Dok 2,571,460 2,571,460
Penilik Jalan ACEH 1.00 Dok 2,571,460 2,571,460 1.00 Dok 2,571,460 2,571,460
BANDA
013 HONORARIUM PETUGAS E-GOVERNMENT ACEH 12.00 BLN 356,400 356,400 12.00 BLN 356,400 356,400
BANDA
011 ADMINISTRASI KEGIATAN ACEH 12.00 BLN 1,983,362 1,983,362 12.00 BLN 2,048,362 2,048,362
BANDA
104 HONORARIUM PENANGGUNG JAWAB KEUANGAN ACEH 12.00 BLN 488,160 488,160 12.00 BLN 488,160 488,160
BANDA
401 MONITORING DAN EVALUASI ACEH 12.00 BLN 320,080 320,080 12.00 BLN 320,080 320,080
BANDA
001 PEMBAYARAN GAJI DAN TUNJANGAN ACEH 12.00 BLN 215,156 215,156 12.00 BLN 215,156 215,156
BANDA
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN ACEH 12.00 BLN 488,630 488,630 12.00 BLN 488,630 488,630
Page 52
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
2 PPK 02
011 ADMINISTRASI KEGIATAN 12.00 BLN 562,608 562,608 12.00 BLN 562,608 562,608
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028 12.00 BLN 92,028 92,028
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020 12.00 BLN 248,020 248,020
1 KM.77 (BATAS PIDIE) - BTS. KOTA SIGLI KAB. PIDIE 003 N 33.27 KM 765,118 - 765,118 33.27 KM 765,118 - 765,118
2 JLN. CIKDITIRO (SIGLI) KAB. PIDIE 003 11 K N 0.96 KM 22,172 22,172 0.96 KM 22,172 22,172
3 BTS. KOTA SIGLI - BEUREUNUN KAB. PIDIE 004 N 9.36 KM 215,257 215,257 9.36 KM 215,257 215,257
4 BEUREUNUN - BTS. ACEH UTARA KAB. PIDIE 004 11 K N 49.17 KM 1,130,818 1,130,818 49.17 KM 1,130,818 1,130,818
KAB. PIDIE
5 BTS. PIDIE - BIREUEN JAYA 005 N 42.08 KM 967,748 967,748 42.08 KM 967,748 967,748
6 JLN. AM. IBRAHIM (SIGLI) BIREUEN 006 N 1.34 KM 30,797 30,797 1.34 KM 30,797 30,797
1 KM.77 (BATAS PIDIE) - BTS. KOTA SIGLI KAB. PIDIE 003 N 428.00 M 428,000 - 428,000 428.00 M 428,000 - 428,000
2 JLN. CIKDITIRO (SIGLI) KAB. PIDIE 003 11 K N 33.90 M 33,900 - 33,900 33.90 M 33,900 - 33,900
3 BTS. KOTA SIGLI - BEUREUNUN KAB. PIDIE 004 N 83.80 M 83,800 83,800 83.80 M 83,800 83,800
4 JLN. AM. IBRAHIM (SIGLI) KAB. PIDIE 004 11 K N 82.70 M 82,700 82,700 82.70 M 82,700 82,700
KAB. PIDIE
5 BEUREUNUN - BTS. ACEH UTARA JAYA 005 873.90 873,900 873,900 873.90 873,900 873,900
6 BTS. PIDIE - BIREUEN BIREUEN 006 617.10 617,100 617,100 617.10 617,100 617,100
1. KM.77 (BATAS PIDIE) - BTS. KOTA SIGLI PIDIE 003 11 K N 0.50 KM 7,500,000 7,500,000 0.50 KM 6,753,078 6,753,078
2. JLN. AM. IBRAHIM (SIGLI)(2 JALUR 2 ARAH) KAB. PIDIE 004 11.K N 1.40 KM 26,802,000 26,802,000 1.40 KM 26,100,951 26,100,951
Honor Panitia, Biaya Lelang, Pengadaan Pengolah Data Banda Aceh 198,000 198,000 198,000 198,000
3. Pelebaran Jalan Bts. Pidie - Bireuen BIREUEN 006 N 3.50 KM 19,250,000 - 19,250,000 3.50 KM 16,873,001 - 16,873,001
Page 53
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
3 PPK 03
011 ADMINISTRASI KEGIATAN 12.00 BLN 563,088 563,088 12.00 BLN 563,088 563,088
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
1 Bireuen - BTS. Kota Lhokseumawa KAB. BIREUEN 007 N 42.41 KM 975,499 - 975,499 42.41 KM 975,499 - 975,499
KAB. ACEH
2 Jl. Raya Banda Aceh (Lhokseumawe) UTARA 007 11 k N 7.52 KM 172,891 172,891 7.52 KM 172,891 172,891
KAB. ACEH
3 BTS. Kota Lhokseumawe - Panton Labu/Simpang (KM 328) UTARA 009 N 47.09 KM 1,083,093 1,083,093 47.09 KM 1,083,093 1,083,093
KAB. ACEH
4 Jl. Raya Medan (Lhokseumawe) UTARA 009 11 k N 0.38 KM 8,763 8,763 0.38 KM 8,763 8,763
KAB. ACEH
5 Krueng Mane - Bukit Rata UTARA 008 N 31.00 KM 736,000 736,000 31.00 KM 736,000 736,000
KAB. ACEH
6 SP. KR. Geukeuh - Pel. Lhokseumawe UTARA 041 N 1.68 KM 38,594 38,594 1.68 KM 38,594 38,594
1 BIREUEN - BTS. KOTA LHOKSEUMAWE BIREUEN 007 N 485.00 M 484,700 - 484,700 485.00 M 484,700 - 484,700
2 BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG ACEH UTARA 008 N 212.50 M 863,600 - 863,600 212.50 M 863,600 - 863,600
3 Krueng Mane - Bukit Rata ACEH UTARA 009 N 791.80 M 212,500 - 212,500 791.80 M 212,500 - 212,500
LHOKSEUMAW
4 SP. KR. Geukeuh - Pel. Lhokseumawe E 041 N 104.00 M 104,000 104,000 104.00 M 104,000 104,000
1. BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG (KM. 328) SEKSI 1 ACEH UTARA 009 N 3.00 KM 17,400,000 17,400,000 3.00 KM 15,431,846 15,431,846
2. BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG (KM. 328) SEKSI 2 ACEH UTARA 009 N 3.50 KM 20,300,000 20,300,000 3.50 KM 17,396,723 17,396,723
3. KRUENG MANE - BUKIT RATA ACEH UTARA 007 N 1.00 KM 8,000,000 8,000,000 1.00 KM 7,284,501 7,284,501
1 Bireuen - Bts. Kota Lhokseumawe BIREUEN 007 N 5.10 KM 25,500,000 - 25,500,000 5.10 KM 18,614,999 - 18,614,999
Page 54
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
4 PPK 04
011 ADMINISTRASI KEGIATAN 12.00 BLN 592,008 592,008 12.00 BLN 592,008 592,008
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
3 Jl. AM. Ibrahim (Langsa) KOTA LANGSA 011 11 K N 4.68 KM 107,617 107,617 4.68 KM 107,617 107,617
KAB. ACEH
4 BTS. Kota Langsa - BTS. Prov Sumut TAMIANG 012 N 44.17 KM 1,015,818 1,015,818 44.17 KM 1,015,818 1,015,818
5 Jl. Agus Salim (Langsa) KOTA LANGSA 012 11 K N 1.42 KM 32,752 - 32,752 1.42 KM 32,752 - 32,752
6 Jl. Ahmad Yani (Langsa) KOTA LANGSA 011 12 K N 5.22 KM 120,106 120,106 5.22 KM 120,106 120,106
7 BTS. Kota Langsa - Kuala Langsa KOTA LANGSA 047 N 4.07 KM 93,610 93,610 4.07 KM 93,610 93,610
8 Jln. Kuala Langsa (Langsa) KOTA LANGSA 047 11 K N 2.96 KM 68,080 68,080 2.96 KM 68,080 68,080
3 Jl. AM. Ibrahim (Langsa) KOTA LANGSA 011 11 K N 10.40 M 10,400 10,400 10.40 M 10,400 10,400
KAB. ACEH
4 BTS. Kota Langsa - BTS. Prov Sumut TAMIANG 012 N 584.30 M 584,300 - 584,300 584.30 M 584,300 - 584,300
5 Jl. Agus Salim (Langsa) KOTA LANGSA 012 11 K 16.00 16,000 16,000 16.00 16,000 16,000
6 Jl. Ahmad Yani (Langsa) KOTA LANGSA 011 12 K 148.20 148,200 148,200 148.20 148,200 148,200
7 BTS. Kota Langsa - Kuala Langsa KOTA LANGSA 047 92.30 92,300 92,300 92.30 92,300 92,300
5 BTS. Kota Langsa - BTS. Prov Sumut seksi 2 (MYC 2012-2014) A.TAMIANG 012 N 6.67 KM 27,362,540 - 27,362,540 6.67 KM 59,435,182 - 59,435,182
Page 55
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
5 PPK 05
011 ADMINISTRASI KEGIATAN 12.00 BLN 563,688 563,688 12.00 BLN 563,688 563,688
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
1 Bireuen - Batas Aceh Tengah ACEH TENGAH 042 N 21.36 M 640,650 - 640,650 21.36 M 640,650 - 640,650
2 Batas Aceh Utara - Batas Kota takengon ACEH TENGAH 043 N 61.19 M 1,835,730 - 1,835,730 61.19 M 1,835,730 - 1,835,730
3 Jl. Raya Bireun (Takengon) ACEH TENGAH 043 N 1.20 M 27,485 27,485 1.20 M 27,485 27,485
1 Bireuen - Batas Aceh Tengah BIREUEN 042 N 387.00 M 387,000 - 387,000 387.00 M 387,000 - 387,000
BENER
2 Batas Aceh Utara - Batas Kota takengon MERIAH 043 N 441.00 M 441,000 - 441,000 441.00 M 441,000 - 441,000
KAB. ACEH
1 Bireuen - Batas Aceh Tengah UTARA 043 N 2.00 M 11,000,000 11,000,000 2.00 M 10,434,241 10,434,241
1 Bireuen - Takengon (MYC 2013 - 2014) BIREUEN 042 N 8.50 KM 50,000,000 . 50,000,000 8.50 KM 47,783,454 . 47,783,454
Page 56
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
6 PPK 07
011 ADMINISTRASI KEGIATAN 12.00 BLN 563,928 563,928 12.00 BLN 563,928 563,928
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
ACEH
1 Pameu-Genting Gerbang TENGAH 018 N 43.60 KM 1,308,000 - 1,308,000 43.60 KM 1,308,000 - 1,308,000
ACEH
1 PAMEU - GENTING GERBANG TENGAH 018 N 296.30 M 296,300 - 296,300 296.30 M 296,300 - 296,300
ACEH
2 GENTING GERBANG - BTS. KOTA TAKENGON TENGAH 019 N 91.00 M 91,000 - 91,000 91.00 M 91,000 - 91,000
312 PENINGKATAN 19.10 KM 22,000,000 396,307 19,815,331 42,211,638 19.10 KM 20,000,000 887,498 22,187,417 43,074,915
ACEH
1 Pameu-Genting Gerbang Seksi 1 TENGAH 018 N 4.40 KM 22,000,000 - 22,000,000 4.40 KM 20,000,000 - 20,000,000
2 PACKAGE No. 3 Reconstruction of National Road,Section Kebayakan – Sp. Kraft GAYO LUES P.042,064 N 14.70 KM 396,307 19,815,331 20,211,638 14.70 KM 887,498 22,187,417 23,074,915
Subtotal PPK 07 - - 24,599,276 396,307 19,815,331 44,810,914 - - 22,599,276 887,498 22,187,417 45,674,191
Page 57
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
7 PPK 07A
011 ADMINISTRASI KEGIATAN 12.00 BLN 580,488 580,488 12.00 BLN 580,488 580,488
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
ACEH
1 Batas Kota Takengon-Uwaq (Km.379) TENGAH 020 N 63.80 KM 3,685,616 - 3,685,616 63.80 KM 3,685,616 - 3,685,616
2 Uwaq (Km.379)-Batas Aceh Tenggara (Km. 415) GAYO LUES 021 N 20.76 KM 802,830 802,830 20.76 KM 802,830 802,830
KAB.ACEH
1 Batas Kota Takengon-Uwaq (Km.379) TENGAH 020 N 173.50 M 173,500 - 173,500 173.50 M 173,500 - 173,500
KAB.ACEH
2 Jln. Syiah Utama (Takengon) TENGAH 020 11.K N 55.70 M 55,700 - 55,700 55.70 M 55,700 - 55,700
KAB.ACEH
3 Uwaq (Km.379)-Batas Aceh Tenggara (Km. 415) TENGAH 021 N 150.70 M 150,700 150,700 150.70 M 150,700 150,700
312 PENINGKATAN 19.60 KM 18,500,000 474,221 23,711,040 42,685,261 19.60 KM 16,124,734 1,386,356 34,658,910 52,170,000
KAB.ACEH
1 Batas Kota Takengon - Uwaq (Km.379) Seksi 2 TENGAH 020 N 3.70 KM 18,500,000 18,500,000 3.70 KM 16,124,734 16,124,734
PACKAGE No. 1 Reconstruction of National Road, Section Sp. Kraft – Batas KAB.ACEH
2 022 N 15.90 KM 474,221 23,711,040 24,185,261 15.90 KM 1,386,356 34,658,910 36,045,266
AcehTengah TENGAH
Subtotal PPK 07A - - 24,288,882 474,221 23,711,040 48,474,143 - - 21,913,616 1,386,356 34,658,910 57,958,882
Page 58
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
8 PPK 08
011 ADMINISTRASI KEGIATAN 12.00 BLN 564,528 564,528 12.00 BLN 564,528 564,528
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028 12.00 BLN 92,028 92,028
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 348,020 348,020 12.00 BLN 348,020 348,020
1 Blangkejeren-Laweaunan GAYO LUES 023 N 55.39 KM 1,661,600 1,661,600 55.39 KM 1,661,600 1,661,600
1 Batas Aceh Tengah (KM.415) - Blangkejeren GAYO LUES 022 N 462.20 M 462,200 462,200 462.20 M 462,200 462,200
2 BLANGKEJEREN - LAWEUANAN GAYO LUES 023 N 376.70 M 376,700 376,700 376.70 M 376,700 376,700
312 PENINGKATAN 19.33 KM 18,605,160 79,262 3,963,066 22,647,488 19.33 KM 18,605,160 1,159,981 28,999,533 48,764,674
1 Blangkejeren-Laweaunan (MYC 2012-2014) GAYO LUES 023, 024 N 9.33 KM 18,605,160 18,605,160 9.33 KM 18,605,160 18,605,160
1 JEMBATAN PUNGKE JAYA II (01.023.014.0) GAYO LUES 023 N 40.00 M 13,000,000 13,000,000 40.00 M 10,788,567 10,788,567
Subtotal PPK 08 - - 35,110,236 79,262 3,963,066 39,152,564 - - 32,898,803 1,159,981 28,999,533 63,058,317
Page 59
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
9 PPK 08 A
011 ADMINISTRASI KEGIATAN 12.00 BLN 564,768 564,768 12.00 BLN 564,768 564,768
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028 12.00 BLN 92,028 92,028
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020 12.00 BLN 248,020 248,020
1 Laweaunan-Batas Kota Kutacane A. TENGGARA 024 N 35.76 KM 1,072,740 1,072,740 35.76 KM 1,072,740 1,072,740
2 Jl. Ahmad Yani (Kotacane) A. TENGGARA 024 11 K N 0.80 KM 24,030 24,030 0.80 KM 24,030 24,030
3 Batas Kota Kutacane-Batas Prov. Sumut A. TENGGARA 025 N 25.71 KM 771,240 771,240 25.71 KM 771,240 771,240
4 Jl. Iskandar Muda (Kotacane) A. TENGGARA 025 11 K N 3.24 KM 97,230 97,230 3.24 KM 97,230 97,230
1 LAWEUANAN - BTS. KOTA KOTACANE A. TENGGARA 024 N 544.50 M 544,500 544,500 544.50 M 544,500 544,500
2 BTS. KOTA KOTA CANE - BTS. PROV. SUMUT A. TENGGARA 025 N 302.20 M 302,200 302,200 302.20 M 302,200 302,200
KAB. ACEH
1 LAWE AUNAN - BTS. KOTA KOTACANE SEKSI 1 TENGGARA 024 N 2.25 KM 11,550,000 11,550,000 2.25 KM 10,172,410 10,172,410
KAB. ACEH
2 LAWE AUNAN - BTS. KOTA KOTACANE SEKSI 2 TENGGARA 024 2.25 KM 11,550,000 11,550,000 2.25 KM 11,068,869 11,068,869
312 PENINGKATAN
Pemeliharaan Berkala / Rehabilitasi Jembatan Si Longal Longal, Cs 7,300,000 7,300,000 5,808,917 5,808,917
1 JEMBATAN JAMUR LAK LAK (01.024.011.0) A. TENGGARA 024 N 30.00 M 7,300,000 - 7,300,000 30.00 M 5,808,917 - 5,808,917
1 Batas Kota Kutacane-Batas Prov. Sumut A. TENGGARA 025 N 3.00 KM 16,000,000 16,000,000 3.00 KM 14,500,000 14,500,000
Page 60
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
SUMMARY KEGIATAN/OUTPUT
2409.01 Pemeliharaan Rutin Jalan 758.665 Km 21,744,701.00 - 21,744,701 758.665 Km 21,744,701.00 - 21,744,701
2409.02 Pemeliharaan Rutin Jembatan 9,030.80 M 9,253,000.00 - 9,253,000 9,030.80 M 9,253,000.00 - 9,253,000
2409.05 Rekonstruksi/Peningkatan Struktur Jalan 90.17 Km 275,135,160.00 949,790.00 47,489,437 323,574,387 90.17 Km 252,407,367.00 3,433,835.00 85,845,860 341,687,062
2409.08 Pembangunan Jembatan Baru 40.00 M 13,000,000.00 - 13,000,000 40.00 M 10,788,567.00 - 10,788,567
2409.14 Pengumpulan Data Jalan Dan Jembatan 2.00 Dok 2,571,460 - 2,571,460 2.00 Dok 2,571,460 - 2,571,460
2409.994 Layanan Perkantoran 12.00 Bulan 11,227,276 11,227,276 12.00 Bulan 11,292,276 11,292,276
Total Alokasi Satker - 459,094,137 949,790 47,489,437 507,533,364 - 456,610,092 3,433,835 85,845,860 545,889,787
Banda Ac
Kepala Satuan
Nasional W
Zam
NIP : 19
Page 61
NCANA REVISI I DIPA
NGGARAN 2014
MUTASI
+ - + -
TETAP
TETAP
TETAP
65,000 BERTAMBAH
TETAP
TETAP
TETAP
TETAP
Page 62
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
746,922 BERKURANG
701,049 BERKURANG
TETAP
2,376,999 BERKURANG
Page 63
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
1,968,154 BERKURANG
2,903,277 BERKURANG
715,499 BERKURANG
6,885,001 BERKURANG
Page 64
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
1,536,819 BERKURANG
2,527,073 BERKURANG
2,410,169 BERTAMBAH
32,072,642 BERTAMBAH
Page 65
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
565,759 BERKURANG
2,216,546 BERKURANG
Page 66
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
2,000,000 BERKURANG
Page 67
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
2,375,266 BERKURANG
Page 68
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
BERKURANG
2,211,433 BERKURANG
Page 69
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
1,377,590 TETAP
481,131 TETAP
TETAP
1,491,083 BERKURANG
1,500,000 BERKURANG
Page 70
MUTASI
+ - + -
TETAP
TETAP
BERTAMBAH
BERTAMBAH
BERKURANG
BERTAMBAH
TETAP
BERTAMBAH
Zamzami,ST,M.Si
NIP : 196607081997031004
Page 71
STRUKTUR RENCANA REVISI I DIPA
TAHUN ANGGARAN 2014
KD.SATKER : 498574
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI ACEH
PROVINSI : ACEH
PROGRAM : TAHUN ANGGARAN 2014
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
2409 Pelaksanaan Preservasi dan Peningkatan Kapasitas Jalan Nasional 1.00 LS 6,423,248 6,423,248 1.00 LS 6,498,248 6,498,248
2409.14 Pengumpulan Data Jalan Dan Jembatan 2.00 Dok 2,571,460 2,571,460 2.00 Dok 2,571,460 2,571,460
Penilik Jalan ACEH 1.00 Dok 2,571,460 2,571,460 1.00 Dok 2,571,460 2,571,460
BANDA
013 HONORARIUM PETUGAS E-GOVERNMENT ACEH 12.00 BLN 356,400 356,400 12.00 BLN 356,400 356,400
BANDA
011 ADMINISTRASI KEGIATAN ACEH 12.00 BLN 1,983,362 1,983,362 12.00 BLN 2,058,362 2,058,362
BANDA
104 HONORARIUM PENANGGUNG JAWAB KEUANGAN ACEH 12.00 BLN 488,160 488,160 12.00 BLN 488,160 488,160
BANDA
401 MONITORING DAN EVALUASI ACEH 12.00 BLN 320,080 320,080 12.00 BLN 320,080 320,080
BANDA
001 PEMBAYARAN GAJI DAN TUNJANGAN ACEH 12.00 BLN 215,156 215,156 12.00 BLN 215,156 215,156
BANDA
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN ACEH 12.00 BLN 488,630 488,630 12.00 BLN 488,630 488,630
Page 72
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
2 PPK 02
011 ADMINISTRASI KEGIATAN 12.00 BLN 562,608 562,608 12.00 BLN 562,608 562,608
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028 12.00 BLN 92,028 92,028
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020 12.00 BLN 248,020 248,020
1 KM.77 (BATAS PIDIE) - BTS. KOTA SIGLI KAB. PIDIE 003 N 33.27 KM 765,118 - 765,118 33.27 KM 765,118 - 765,118
2 JLN. CIKDITIRO (SIGLI) KAB. PIDIE 003 11 K N 0.96 KM 22,172 22,172 0.96 KM 22,172 22,172
3 BTS. KOTA SIGLI - BEUREUNUN KAB. PIDIE 004 N 9.36 KM 215,257 215,257 9.36 KM 215,257 215,257
4 BEUREUNUN - BTS. ACEH UTARA KAB. PIDIE 004 11 K N 49.17 KM 1,130,818 1,130,818 49.17 KM 1,130,818 1,130,818
KAB. PIDIE
5 BTS. PIDIE - BIREUEN JAYA 005 N 42.08 KM 967,748 967,748 42.08 KM 967,748 967,748
6 JLN. AM. IBRAHIM (SIGLI) BIREUEN 006 N 1.34 KM 30,797 30,797 1.34 KM 30,797 30,797
1 KM.77 (BATAS PIDIE) - BTS. KOTA SIGLI KAB. PIDIE 003 N 428.00 M 428,000 - 428,000 428.00 M 428,000 - 428,000
2 JLN. CIKDITIRO (SIGLI) KAB. PIDIE 003 11 K N 33.90 M 33,900 - 33,900 33.90 M 33,900 - 33,900
3 BTS. KOTA SIGLI - BEUREUNUN KAB. PIDIE 004 N 83.80 M 83,800 83,800 83.80 M 83,800 83,800
4 JLN. AM. IBRAHIM (SIGLI) KAB. PIDIE 004 11 K N 82.70 M 82,700 82,700 82.70 M 82,700 82,700
KAB. PIDIE
5 BEUREUNUN - BTS. ACEH UTARA JAYA 005 873.90 873,900 873,900 873.90 873,900 873,900
6 BTS. PIDIE - BIREUEN BIREUEN 006 617.10 617,100 617,100 617.10 617,100 617,100
1. KM.77 (BATAS PIDIE) - BTS. KOTA SIGLI PIDIE 003 11 K N 0.50 KM 7,500,000 7,500,000 0.50 KM 7,500,000 7,500,000
2. JLN. AM. IBRAHIM (SIGLI)(2 JALUR 2 ARAH) KAB. PIDIE 004 11.K N 1.40 KM 26,802,000 26,802,000 1.40 KM 26,802,000 26,802,000
Honor Panitia, Biaya Lelang, Pengadaan Pengolah Data Banda Aceh 198,000 198,000 198,000 198,000
3. Pelebaran Jalan Bts. Pidie - Bireuen BIREUEN 006 N 3.50 KM 19,250,000 - 19,250,000 3.50 KM 19,250,000 - 19,250,000
Page 73
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
3 PPK 03
011 ADMINISTRASI KEGIATAN 12.00 BLN 563,088 563,088 12.00 BLN 563,088 563,088
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
1 Bireuen - BTS. Kota Lhokseumawa KAB. BIREUEN 007 N 42.41 KM 975,499 - 975,499 42.41 KM 975,499 - 975,499
KAB. ACEH
2 Jl. Raya Banda Aceh (Lhokseumawe) UTARA 007 11 k N 7.52 KM 172,891 172,891 7.52 KM 172,891 172,891
KAB. ACEH
3 BTS. Kota Lhokseumawe - Panton Labu/Simpang (KM 328) UTARA 009 N 47.09 KM 1,083,093 1,083,093 47.09 KM 1,083,093 1,083,093
KAB. ACEH
4 Jl. Raya Medan (Lhokseumawe) UTARA 009 11 k N 0.38 KM 8,763 8,763 0.38 KM 8,763 8,763
KAB. ACEH
5 Krueng Mane - Bukit Rata UTARA 008 N 31.00 KM 736,000 736,000 31.00 KM 736,000 736,000
KAB. ACEH
6 SP. KR. Geukeuh - Pel. Lhokseumawe UTARA 041 N 1.68 KM 38,594 38,594 1.68 KM 38,594 38,594
1 BIREUEN - BTS. KOTA LHOKSEUMAWE BIREUEN 007 N 485.00 M 484,700 - 484,700 485.00 M 484,700 - 484,700
2 BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG ACEH UTARA 008 N 212.50 M 863,600 - 863,600 212.50 M 863,600 - 863,600
3 Krueng Mane - Bukit Rata ACEH UTARA 009 N 791.80 M 212,500 - 212,500 791.80 M 212,500 - 212,500
LHOKSEUMAW
4 SP. KR. Geukeuh - Pel. Lhokseumawe E 041 N 104.00 M 104,000 104,000 104.00 M 104,000 104,000
1. BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG (KM. 328) SEKSI 1 ACEH UTARA 009 N 3.00 KM 17,400,000 17,400,000 3.00 KM 17,400,000 17,400,000
2. BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG (KM. 328) SEKSI 2 ACEH UTARA 009 N 3.50 KM 20,300,000 20,300,000 3.50 KM 20,300,000 20,300,000
3. KRUENG MANE - BUKIT RATA ACEH UTARA 007 N 1.00 KM 8,000,000 8,000,000 1.00 KM 8,000,000 8,000,000
1 Bireuen - Bts. Kota Lhokseumawe BIREUEN 007 N 5.10 KM 25,500,000 - 25,500,000 5.10 KM 20,350,484 - 20,350,484
Page 74
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
4 PPK 04
011 ADMINISTRASI KEGIATAN 12.00 BLN 592,008 592,008 12.00 BLN 592,008 592,008
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
3 Jl. AM. Ibrahim (Langsa) KOTA LANGSA 011 11 K N 4.68 KM 107,617 107,617 4.68 KM 107,617 107,617
KAB. ACEH
4 BTS. Kota Langsa - BTS. Prov Sumut TAMIANG 012 N 44.17 KM 1,015,818 1,015,818 44.17 KM 1,015,818 1,015,818
5 Jl. Agus Salim (Langsa) KOTA LANGSA 012 11 K N 1.42 KM 32,752 - 32,752 1.42 KM 32,752 - 32,752
6 Jl. Ahmad Yani (Langsa) KOTA LANGSA 011 12 K N 5.22 KM 120,106 120,106 5.22 KM 120,106 120,106
7 BTS. Kota Langsa - Kuala Langsa KOTA LANGSA 047 N 4.07 KM 93,610 93,610 4.07 KM 93,610 93,610
8 Jln. Kuala Langsa (Langsa) KOTA LANGSA 047 11 K N 2.96 KM 68,080 68,080 2.96 KM 68,080 68,080
3 Jl. AM. Ibrahim (Langsa) KOTA LANGSA 011 11 K N 10.40 M 10,400 10,400 10.40 M 10,400 10,400
KAB. ACEH
4 BTS. Kota Langsa - BTS. Prov Sumut TAMIANG 012 N 584.30 M 584,300 - 584,300 584.30 M 584,300 - 584,300
5 Jl. Agus Salim (Langsa) KOTA LANGSA 012 11 K 16.00 16,000 16,000 16.00 16,000 16,000
6 Jl. Ahmad Yani (Langsa) KOTA LANGSA 011 12 K 148.20 148,200 148,200 148.20 148,200 148,200
7 BTS. Kota Langsa - Kuala Langsa KOTA LANGSA 047 92.30 92,300 92,300 92.30 92,300 92,300
5 BTS. Kota Langsa - BTS. Prov Sumut seksi 2 (MYC 2012-2014) A.TAMIANG 012 N 6.67 KM 27,362,540 - 27,362,540 6.67 KM 27,362,540 - 27,362,540
Page 75
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
5 PPK 05
011 ADMINISTRASI KEGIATAN 12.00 BLN 563,688 563,688 12.00 BLN 563,688 563,688
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
1 Bireuen - Batas Aceh Tengah ACEH TENGAH 042 N 21.36 M 640,650 - 640,650 21.36 M 640,650 - 640,650
2 Batas Aceh Utara - Batas Kota takengon ACEH TENGAH 043 N 61.19 M 1,835,730 - 1,835,730 61.19 M 1,835,730 - 1,835,730
3 Jl. Raya Bireun (Takengon) ACEH TENGAH 043 N 1.20 M 27,485 27,485 1.20 M 27,485 27,485
1 Bireuen - Batas Aceh Tengah BIREUEN 042 N 387.00 M 387,000 - 387,000 387.00 M 387,000 - 387,000
BENER
2 Batas Aceh Utara - Batas Kota takengon MERIAH 043 N 441.00 M 441,000 - 441,000 441.00 M 441,000 - 441,000
KAB. ACEH
1 Bireuen - Batas Aceh Tengah UTARA 043 N 2.00 M 11,000,000 11,000,000 2.00 M 11,000,000 11,000,000
1 Bireuen - Takengon (MYC 2013 - 2014) BIREUEN 042 N 8.50 KM 50,000,000 . 50,000,000 8.50 KM 50,000,000 . 50,000,000
Page 76
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
6 PPK 07
011 ADMINISTRASI KEGIATAN 12.00 BLN 563,928 563,928 12.00 BLN 563,928 563,928
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
ACEH
1 Pameu-Genting Gerbang TENGAH 018 N 43.60 KM 1,308,000 - 1,308,000 43.60 KM 1,308,000 - 1,308,000
ACEH
1 PAMEU - GENTING GERBANG TENGAH 018 N 296.30 M 296,300 - 296,300 296.30 M 296,300 - 296,300
ACEH
2 GENTING GERBANG - BTS. KOTA TAKENGON TENGAH 019 N 91.00 M 91,000 - 91,000 91.00 M 91,000 - 91,000
312 PENINGKATAN 19.10 KM 22,000,000 396,307 19,815,331 42,211,638 19.10 KM 22,000,000 1,267,172 37,580,854 60,848,026
ACEH
1 Pameu-Genting Gerbang Seksi 1 TENGAH 018 N 4.40 KM 22,000,000 - 22,000,000 4.40 KM 22,000,000 - 22,000,000
2 PACKAGE No. 3 Reconstruction of National Road,Section Kebayakan – Sp. Kraft GAYO LUES P.042,064 N 14.70 KM 396,307 19,815,331 20,211,638 14.70 KM 1,267,172 37,580,854 38,848,026
Subtotal PPK 07 - - 24,599,276 396,307 19,815,331 44,810,914 - - 24,599,276 1,267,172 37,580,854 63,447,302
Page 77
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
7 PPK 07A
011 ADMINISTRASI KEGIATAN 12.00 BLN 580,488 580,488 12.00 BLN 580,488 580,488
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028.00 12.00 BLN 92,028 92,028.00
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020.00 12.00 BLN 248,020 248,020.00
ACEH
1 Batas Kota Takengon-Uwaq (Km.379) TENGAH 020 N 63.80 KM 3,685,616 - 3,685,616 63.80 KM 3,685,616 - 3,685,616
2 Uwaq (Km.379)-Batas Aceh Tenggara (Km. 415) GAYO LUES 021 N 20.76 KM 802,830 802,830 20.76 KM 802,830 802,830
KAB.ACEH
1 Batas Kota Takengon-Uwaq (Km.379) TENGAH 020 N 173.50 M 173,500 - 173,500 173.50 M 173,500 - 173,500
KAB.ACEH
2 Jln. Syiah Utama (Takengon) TENGAH 020 11.K N 55.70 M 55,700 - 55,700 55.70 M 55,700 - 55,700
KAB.ACEH
3 Uwaq (Km.379)-Batas Aceh Tenggara (Km. 415) TENGAH 021 N 150.70 M 150,700 150,700 150.70 M 150,700 150,700
312 PENINGKATAN 19.60 KM 18,500,000 474,221 23,711,040 42,685,261 19.60 KM 18,500,000 948,442 23,711,040 43,159,482
KAB.ACEH
1 Batas Kota Takengon - Uwaq (Km.379) Seksi 2 TENGAH 020 N 3.70 KM 18,500,000 18,500,000 3.70 KM 18,500,000 18,500,000
PACKAGE No. 1 Reconstruction of National Road, Section Sp. Kraft – Batas KAB.ACEH
2 022 N 15.90 KM 474,221 23,711,040 24,185,261 15.90 KM 948,442 23,711,040 24,659,482
AcehTengah TENGAH
Subtotal PPK 07A - - 24,288,882 474,221 23,711,040 48,474,143 - - 24,288,882 948,442 23,711,040 48,948,364
Page 78
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
8 PPK 08
011 ADMINISTRASI KEGIATAN 12.00 BLN 564,528 564,528 12.00 BLN 564,528 564,528
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028 12.00 BLN 92,028 92,028
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 348,020 348,020 12.00 BLN 348,020 348,020
1 Blangkejeren-Laweaunan GAYO LUES 023 N 55.39 KM 1,661,600 1,661,600 55.39 KM 1,661,600 1,661,600
1 Batas Aceh Tengah (KM.415) - Blangkejeren GAYO LUES 022 N 462.20 M 462,200 462,200 462.20 M 462,200 462,200
2 BLANGKEJEREN - LAWEUANAN GAYO LUES 023 N 376.70 M 376,700 376,700 376.70 M 376,700 376,700
312 PENINGKATAN 19.33 KM 18,605,160 79,262 3,963,066 22,647,488 19.33 KM 18,605,160 1,398,523 41,963,066 61,966,749
1 Blangkejeren-Laweaunan (MYC 2012-2014) GAYO LUES 023, 024 N 9.33 KM 18,605,160 18,605,160 9.33 KM 18,605,160 18,605,160
1 JEMBATAN PUNGKE JAYA II (01.023.014.0) GAYO LUES 023 N 40.00 M 13,000,000 13,000,000 40.00 M 13,000,000 13,000,000
Subtotal PPK 08 - - 35,110,236 79,262 3,963,066 39,152,564 - - 35,110,236 1,398,523 41,963,066 78,471,825
Page 79
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
9 PPK 08 A
011 ADMINISTRASI KEGIATAN 12.00 BLN 564,768 564,768 12.00 BLN 564,768 564,768
001 PEMBAYARAN GAJI DAN TUNJANGAN 12.00 BLN 92,028 92,028 12.00 BLN 92,028 92,028
002 PENYELENGGARAAN OPERASIONAL DAN PEMELIHARAAN PERKANTORAN 12.00 BLN 248,020 248,020 12.00 BLN 248,020 248,020
1 Laweaunan-Batas Kota Kutacane A. TENGGARA 024 N 35.76 KM 1,072,740 1,072,740 35.76 KM 1,072,740 1,072,740
2 Jl. Ahmad Yani (Kotacane) A. TENGGARA 024 11 K N 0.80 KM 24,030 24,030 0.80 KM 24,030 24,030
3 Batas Kota Kutacane-Batas Prov. Sumut A. TENGGARA 025 N 25.71 KM 771,240 771,240 25.71 KM 771,240 771,240
4 Jl. Iskandar Muda (Kotacane) A. TENGGARA 025 11 K N 3.24 KM 97,230 97,230 3.24 KM 97,230 97,230
1 LAWEUANAN - BTS. KOTA KOTACANE A. TENGGARA 024 N 544.50 M 544,500 544,500 544.50 M 544,500 544,500
2 BTS. KOTA KOTA CANE - BTS. PROV. SUMUT A. TENGGARA 025 N 302.20 M 302,200 302,200 302.20 M 302,200 302,200
KAB. ACEH
1 LAWE AUNAN - BTS. KOTA KOTACANE SEKSI 1 TENGGARA 024 N 2.25 KM 11,550,000 11,550,000 2.25 KM 11,550,000 11,550,000
KAB. ACEH
2 LAWE AUNAN - BTS. KOTA KOTACANE SEKSI 2 TENGGARA 024 2.25 KM 11,550,000 11,550,000 2.25 KM 11,550,000 11,550,000
312 PENINGKATAN
Pemeliharaan Berkala / Rehabilitasi Jembatan Si Longal Longal, Cs 7,300,000 7,300,000 7,300,000 7,300,000
1 JEMBATAN JAMUR LAK LAK (01.024.011.0) A. TENGGARA 024 N 30.00 M 7,300,000 - 7,300,000 30.00 M 7,300,000 - 7,300,000
1 Batas Kota Kutacane-Batas Prov. Sumut A. TENGGARA 025 N 3.00 KM 16,000,000 16,000,000 3.00 KM 16,000,000 16,000,000
Page 80
DIPA AWAL REVISI I DIPA
S SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
NON FISIK NON FISIK
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. A
LOKASI RP. MURNI RP. MURNI
NO Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND
SUMMARY KEGIATAN/OUTPUT
2409.01 Pemeliharaan Rutin Jalan 758.665 Km 21,744,701.00 - 21,744,701 758.665 Km 21,744,701.00 - 21,744,701
2409.02 Pemeliharaan Rutin Jembatan 9,030.80 M 9,253,000.00 - 9,253,000 9,030.80 M 9,253,000.00 - 9,253,000
2409.05 Rekonstruksi/Peningkatan Struktur Jalan 90.17 Km 275,135,160.00 949,790.00 47,489,437 323,574,387 90.17 Km 275,135,160.00 3,614,137.00 103,254,960 382,004,257
2409.08 Pembangunan Jembatan Baru 40.00 M 13,000,000.00 - 13,000,000 40.00 M 13,000,000.00 - 13,000,000
2409.14 Pengumpulan Data Jalan Dan Jembatan 2.00 Dok 2,571,460 - 2,571,460 2.00 Dok 2,571,460 - 2,571,460
2409.994 Layanan Perkantoran 12.00 Bulan 11,227,276 11,227,276 12.00 Bulan 11,302,276 11,302,276
Total Alokasi Satker - 459,094,137 949,790 47,489,437 507,533,364 - 456,429,790 3,614,137 103,254,960 563,298,887
Banda A
Kepala Satuan
Nasional W
Zam
NIP : 19
Page 81
NCANA REVISI I DIPA
NGGARAN 2014
MUTASI
+ - + -
TETAP
TETAP
TETAP
75,000 BERTAMBAH
TETAP
TETAP
TETAP
TETAP
Page 82
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
- TETAP
- TETAP
TETAP
- TETAP
Page 83
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
- TETAP
- TETAP
- TETAP
5,149,516 BERKURANG
Page 84
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
- TETAP
- TETAP
2,410,169 BERTAMBAH
- TETAP
Page 85
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
- TETAP
- TETAP
Page 86
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
- TETAP
Page 87
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
- TETAP
474,221 - BERTAMBAH
Page 88
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
- TETAP
Page 89
MUTASI
+ - + -
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
- TETAP
- TETAP
TETAP
- TETAP
- TETAP
Page 90
MUTASI
+ - + -
TETAP
TETAP
BERTAMBAH
BERTAMBAH
TETAP
BERKURANG
TETAP
BERTAMBAH
Zamzami,ST,M.Si
NIP : 196607081997031004
Page 91
FORM SURVEY UNTUK PEKERJAAN EVALUASI PENGGUNAAN DAN PEMANFAATAN RUANG BAGIAN JALAN
KOORDINAT
PANJANG KM PENANGANAN BAHU JEMBATAN
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. LEBAR DECIMAL JUMLAH JENIS LEBAR KONDISI
LOKASI KET
NO Komponen / Paket RUAS PENANGANAN LAJUR PERKERASAN DESKRIPSI JALAN
AWAL AKHIR AWAL AKHIR BENTANG LEBAR
VOL STN LEBAR JENIS KONDISI
2 PPK 02
1 KM.77 (BATAS PIDIE) - BTS. KOTA SIGLI KAB. PIDIE 003 33.27 KM
i
310 OP RUTIN 2,119.40 M
i s
1 KM.77 (BATAS PIDIE) - BTS. KOTA SIGLI KAB. PIDIE 003 428.00 M
Di
2 JLN. CIKDITIRO (SIGLI) KAB. PIDIE 003 11 K 33.90 M
2. JLN. AM. IBRAHIM (SIGLI)(2 JALUR 2 ARAH) KAB. PIDIE 004 11.K 1.40 KM
Page 92
KOORDINAT
PANJANG KM PENANGANAN BAHU JEMBATAN
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. LEBAR DECIMAL JUMLAH JENIS LEBAR KONDISI
LOKASI KET
NO Komponen / Paket RUAS PENANGANAN LAJUR PERKERASAN DESKRIPSI JALAN
AWAL AKHIR AWAL AKHIR BENTANG LEBAR
VOL STN LEBAR JENIS KONDISI
3 PPK 03
i
2409.02 Pemeliharaan Rutin Jembatan
i s
310 OP RUTIN 1,664.80 M
Di
1 BIREUEN - BTS. KOTA LHOKSEUMAWE BIREUEN 007 484.70 M
1. BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG (KM. 328) SEKSI 1 ACEH UTARA 009 3.350 KM
2. BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG (KM. 328) SEKSI 2 ACEH UTARA 009 3.50 KM
Page 93
KOORDINAT
PANJANG KM PENANGANAN BAHU JEMBATAN
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. LEBAR DECIMAL JUMLAH JENIS LEBAR KONDISI
LOKASI KET
NO Komponen / Paket RUAS PENANGANAN LAJUR PERKERASAN DESKRIPSI JALAN
AWAL AKHIR AWAL AKHIR BENTANG LEBAR
VOL STN LEBAR JENIS KONDISI
4 PPK 04
i
310 OP RUTIN 2,188.00 M
s
KAB. ACEH
i
1 Panton Labu/Simpang (Km.328) - Peureulak (Km.392) TIMUR 010 864.42 M
Di
KAB. ACEH
2 Peureulak (Km.392) - Bts. Kota Langsa TIMUR 011 560.10 M
a. Termasuk Pembayaran Pekerjaan Sisa Paket Pada Tahun 2013 (Penggantian Jembatan Alue Rambut) 1.00 LS
4 BTS. Kota Langsa - BTS. Prov Sumut seksi 2 (MYC 2012-2014) A.TAMIANG 012 1.87 KM
Page 94
KOORDINAT
PANJANG KM PENANGANAN BAHU JEMBATAN
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. LEBAR DECIMAL JUMLAH JENIS LEBAR KONDISI
LOKASI KET
NO Komponen / Paket RUAS PENANGANAN LAJUR PERKERASAN DESKRIPSI JALAN
AWAL AKHIR AWAL AKHIR BENTANG LEBAR
VOL STN LEBAR JENIS KONDISI
5 PPK 05
2 Batas Aceh Utara - Batas Kota takengon ACEH TENGAH 043 61.19 M
i
3 Jl. Raya Bireun (Takengon) ACEH TENGAH 043 1.20 M
i s
Di
2409.02 Pemeliharaan Rutin Jembatan
BENER
2 Batas Aceh Utara - Batas Kota takengon MERIAH 043 441.00 M
KAB. ACEH
1 Bireuen - Batas Aceh Tengah UTARA 043 2.00 M
ii s i
D
Page 95
KOORDINAT
PANJANG KM PENANGANAN BAHU JEMBATAN
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. LEBAR DECIMAL JUMLAH JENIS LEBAR KONDISI
LOKASI KET
NO Komponen / Paket RUAS PENANGANAN LAJUR PERKERASAN DESKRIPSI JALAN
AWAL AKHIR AWAL AKHIR BENTANG LEBAR
VOL STN LEBAR JENIS KONDISI
6 PPK 07
i
ACEH
1 Pameu-Genting Gerbang 018 43.60 KM
s
TENGAH
2409.02
310
Pemeliharaan Rutin Jembatan
OP RUTIN
296.30 M
Di i
ACEH
2 GENTING GERBANG - BTS. KOTA TAKENGON TENGAH 019 91.00 M
ACEH
1 Pameu-Genting Gerbang Seksi 1 TENGAH 018 4.40 KM
2 PACKAGE No. 3 Reconstruction of National Road,Section Kebayakan – Sp. Kraft GAYO LUES P.042,064 14.70 KM
Page 96
KOORDINAT
PANJANG KM PENANGANAN BAHU JEMBATAN
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. LEBAR DECIMAL JUMLAH JENIS LEBAR KONDISI
LOKASI KET
NO Komponen / Paket RUAS PENANGANAN LAJUR PERKERASAN DESKRIPSI JALAN
AWAL AKHIR AWAL AKHIR BENTANG LEBAR
VOL STN LEBAR JENIS KONDISI
7 PPK 07A
ACEH
1 Batas Kota Takengon-Uwaq (Km.379) TENGAH 020 63.80 KM
2 Uwaq (Km.379)-Batas Aceh Tenggara (Km. 415) GAYO LUES 021 20.76 KM
i
310 OP RUTIN 379.90 M
ii s
D
KAB.ACEH
2 Jln. Syiah Utama (Takengon) TENGAH 020 11.K 105.70 M
KAB.ACEH
3 Uwaq (Km.379)-Batas Aceh Tenggara (Km. 415) TENGAH 021 130.70 M
KAB.ACEH
1 Batas Kota Takengon - Uwaq (Km.379) Seksi 2 TENGAH 020 4.90 KM
KAB.ACEH
2 Batas Kota Takengon - Uwaq (Km.379) Seksi 3 TENGAH 020 KM
PACKAGE No. 1 Reconstruction of National Road, Section Sp. Kraft – Batas KAB.ACEH
3 022 15.90 KM
AcehTengah TENGAH
Page 97
KOORDINAT
PANJANG KM PENANGANAN BAHU JEMBATAN
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. LEBAR DECIMAL JUMLAH JENIS LEBAR KONDISI
LOKASI KET
NO Komponen / Paket RUAS PENANGANAN LAJUR PERKERASAN DESKRIPSI JALAN
AWAL AKHIR AWAL AKHIR BENTANG LEBAR
VOL STN LEBAR JENIS KONDISI
8 PPK 08
i s i
Di
1 Batas Aceh Tengah (KM.415) - Blangkejeren GAYO LUES 022 462.20 M
Page 98
KOORDINAT
PANJANG KM PENANGANAN BAHU JEMBATAN
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / NO. LEBAR DECIMAL JUMLAH JENIS LEBAR KONDISI
LOKASI KET
NO Komponen / Paket RUAS PENANGANAN LAJUR PERKERASAN DESKRIPSI JALAN
AWAL AKHIR AWAL AKHIR BENTANG LEBAR
VOL STN LEBAR JENIS KONDISI
9 PPK 08 A
si
2 BTS. KOTA KOTA CANE - BTS. PROV. SUMUT A. TENGGARA 025 221.00 M
2409.05
312
Rekonstruksi/Peningkatan Struktur Jalan
PENINGKATAN 4.50 KM
Di i
KAB. ACEH
1 LAWE AUNAN - BTS. KOTA KOTACANE SEKSI 1 TENGGARA 024 2.25 KM
KAB. ACEH
2 LAWE AUNAN - BTS. KOTA KOTACANE SEKSI 2 TENGGARA 024 2.25 KM
KAB. ACEH
3 LAWE AUNAN - BTS. KOTA KOTACANE SEKSI 3 TENGGARA 024 KM
312 PENINGKATAN
Page 99
EFFEKTIF
PPK 2 ###
PPK 3 ###
PPK 4 ###
PPK 5
PPK 7
PPK 7A ###
PPK 8 ###
PPK 8A
#VALUE!
STRUKTUR RENCANA REVISI II DIPA
TAHUN ANGGARAN 2014
KD.SATKER : 498574
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI ACEH
PROVINSI : ACEH
PROGRAM : TAHUN ANGGARAN 2014 ( Dalam Ribuan Rupiah )
REVISI I DIPA REVISI II DIPA
S MUTASI
SASARAN FISIK/ SASARAN FISIK/
T BIAYA BIAYA
PROGRAM NON FISIK NON FISIK
Pelaksanan Kegiatan / Kegiatan / Output / NO. A
/ LOKASI RP. MURNI RP. MURNI RUPIAH MURNI
NO
Komponen / Paket RUAS T TOTAL TOTAL
U VOL STN PHLN VOL STN PHLN
S NON. PEND PEND NON. PEND PEND + -
312 PEMBANGUNAN
1 Bireuen - Bts. Kota Lhokseumawe BIREUEN 007 N 5.10 KM 25,425,000 - 25,425,000 5.10 KM 22,725,000 - 22,725,000 2,700,000
312 PENINGKATAN 14.70 KM - 949,790 47,489,437 48,439,227 14.70 KM - 3,649,790 107,868,529 111,518,319
PACKAGE No. 1 Reconstruction of National Road, Section Sp. Kraft – Batas KAB.ACEH
1 022 N 15.90 KM 303,408 15,170,379 15,473,787 15.90 KM 1,452,006 40,351,801 41,803,807 1,148,598
AcehTengah TENGAH
3 PACKAGE No. 3 Reconstruction of National Road,Section Kebayakan – Sp. Kraft GAYO LUES P.042,064 N 14.70 KM 302,307 15,115,331 15,417,638 14.70 KM 994,443 30,624,900 31,619,343 692,136
- 25,425,000 949,790 47,489,437 48,439,227 - 22,725,000 3,649,790 107,868,529 111,518,319 2,700,000 2,700,000
Page 101
STRUKTUR RENCANA REVISI II DIPA
TAHUN ANGGARAN 2014
MUTASI
PHLN KET
+ -
BERKURANG
25,181,422 BERTAMBAH
19,688,101 BERTAMBAH
15,509,569 BERTAMBAH
60,379,092 -
Page 102
TABEL RENCANA REVISI
PADA TAHUN ANGGARAN 2013
A. PEMANFAATAN DANA SISA
(D
1 #REF! 3,283,000,000 2,486,431,000 796,569,000 A. PENAMBAHAN 10 % WORKSHOP 241,324,000 DARI BELANJA MODAL KE
#REF! 129,500,000 126,885,000 2,615,000 B. PENAMBAHAN SPP INDUK 300,000,000 DARI BELANJA MODAL KE
#REF! 87,500,000 85,360,000 2,140,000 C. PENAMBAHAN SPP PPK 7 85,000,000 DARI BELANJA MODAL KE
2 Rekonstruksi/ Peningkatan Jalan Struktur Batas Kota Takengon - Uwaq 37,513,769,000 37,188,769,000 325,000,000 A. Pengadaan Pengolah Data dan Meubeliar (B. Barang) 325,000,000 DARI BELANJA MODAL KE
(Km.379)
3 Rekonstruksi/Peningkatan Struktur Jalan Laweaunan-Batas Kota Kutacane 12,587,861,000 12,277,861,000 310,000,000 A. Pengadaan Pengolah Data dan Meubeliar (B. Barang) 310,000,000 DARI BELANJA MODAL KE
B BELANJA BARANG
Bireuen - Batas Aceh Tengah 1,572,000,000 786,000,000 786,000,000 A. BIREUEN - BTS. KOTA LHOKSEUMAWE 50,000,000
Batas Aceh Utara - Batas Kota takengon 1,816,000,000 544,500,000 1,271,500,000 B. BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG 400,000,000
D. PPK 4
KET
Belum dikasih
STRUKTUR REVISI IV DIPA
TAHUN ANGGARAN 2013
KD.SATKER : 498574
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI ACEH
PROVINSI : ACEH
PROGRAM : TAHUN ANGGARAN 2013 ( Dalam Ribuan Rupiah )
REVISI III DIPA REVISI IV DIPA
SASARAN
SASARAN FISIK/
PROGRAM/ Pelaksanan Kegiatan / Kegiatan / Output / FISIK/
NON FISIK KET
NO Komponen / Paket NON FISIK Alokasi Dana Alokasi Dana
VOL STN VOL STN
SUMMARY KEGIATAN/OUTPUT
033.04.08 PROGRAM PENYELENGGARAAN JALAN
2409.01 Pemeliharaan Rutin Jalan 722.52 Km 21,425,705 722.52 Km 20,554,952 BERTAMBAH
2409.02 Pemeliharaan Rutin Jembatan ### M 19,787,800 8,943.50 M 18,726,373 BERKURANG
2409.03 Pemeliharaan Berkala/Rehabilitasi Jalan 5.50 Km 3,200,138 5.50 Km #REF! TETAP
2409.04 Pemeliharaan Berkala/Rehabilitasi Jembatan 531.30 M 35,655,173 531.30 M #REF! TETAP
2409.05 Rekonstruksi/Peningkatan Struktur Jalan 58.82 Km 183,024,843 58.82 Km #REF! BERTAMBAH
2409.06 Penggantian Jembatan 45.30 M 16,850,539 45.30 M #REF! TETAP
2409.08 Pembangunan Jembatan Baru 38.00 M 9,095,877 38.00 M #REF! BERTAMBAH
2409.09 Pelebaran Jalan 63.07 Km 326,107,382 63.07 Km #REF! BERKURANG
2409.14 Pengumpulan Data Jalan Dan Jembatan 2.00 Dok 4,000,000 2.00 Dok - TETAP
2409.998 Gedung/Bangunan 1.00 Unit 3,500,000 1.00 Unit #REF! TETAP
2409.994 Layanan Perkantoran 12.00 Bulan 11,345,037 12.00 Bulan #REF! BERTAMBAH
Total Alokasi Satker 34.70 - 5,160,000 Total Alokasi Satker 34.70 - 5,160,000
Page 105
TABEL RENCANA REVISI IV
PADA TAHUN ANGGARAN 2013
DIMANFAATKAN UNTUK/
SISA DANA RENCANA REVISI DANA
PAGU KONTRAK TIDAK YANG BELUM
NO. NAMA PAKET TA. 2013 KET
(RP.) TERSERAP DIMANFAATKAN
(RP.) (RP.) (RP.)
URAIAN RP.
1 2 3 4 5 6 7 8 8
A BELANJA MODAL
1 #REF! 3,283,000,000 2,486,431,000 796,569,000 A. PENAMBAHAN 10 % BANGUNAN WORKSHOP 241,324,000
#REF! 129,500,000 126,885,000 2,615,000 B. PENAMBAHAN 10 % PENGAWASAN WORKSHOP 2,615,000
#REF! 87,500,000 85,360,000 2,140,000
SUB TOTAL 3,500,000,000 2,698,676,000 801,324,000 243,939,000 557,385,000
2 Rekonstruksi/ Peningkatan Jalan Struktur Batas Kota Takengon - Uwaq (Km.379) 37,513,769,000 37,188,769,000 325,000,000 A. Pengadaan Pengolah Data dan Meubeliar (PPK 7A) 325,000,000
3 Rekonstruksi/Peningkatan Struktur Jalan Laweaunan-Batas Kota Kutacane 12,587,861,000 12,277,861,000 310,000,000 A. Pengadaan Pengolah Data dan Meubeliar (PPK 8A) 310,000,000
SUB TOTAL 50,101,630,000 49,466,630,000 635,000,000 635,000,000 -
Rutin Jembatan Bireuen - Batas Aceh Tengah (PPK 5) 1,572,000,000 972,000,000 500,000,000 A. RUTIN JEMBT. BIREUEN - BTS. KOTA LHOKSEUMAWE (PPK 3) 50,000,000
Rutin Jembatan Batas Aceh Utara - Batas Kota takengon (PPK 5) 1,816,000,000 1,084,096,000 631,904,000 B. RUTIN JEMBT. BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG (PPK 3) 400,000,000
Belanja Sewa Mess (PPK 8) 30,000,000 30,000,000 C. RUTIN JEMB. SP. KR. Geukeuh - Pel. Lhokseumawe (PPK 3) 50,000,000
D. PENAMBAHAN SPPD (INDUK) 407,680,000
E. PENAMBAHAN SPPD (PPK 7) 91,728,000
F. PENAMBAHAN SPPD (PPK 7A) 91,728,000
G. PENAMBAHAN SPPD (PPK 8) 91,728,000
SUB TOTAL
TOTAL 61,019,630,000 56,086,402,000 6,568,228,000 - 4,277,763,000 2,290,465,000
INDUK
AWAL
Satuan Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri (PP) Ekonomi JAKARTA - BANDA ACEH [1 ORG x 66 KL x 1 TR] 1 66 1 =
Uang Harian Perjalanan Dinas (D.K.I. Jakarta) [1 ORG x 66 KL x 1 TR x 5 HR] 1 66 1 5=
Biaya Penginapan Perjalanan Dinas Pejabat Eselon IV/Golongan III (D.K.I. JAKARTA) [1 ORG x 66 KL x 1 TR x 5 HR] 1 66 1 5=
TOTAL
REVISI
Satuan Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri (PP) Ekonomi JAKARTA - BANDA ACEH [1 ORG x 66 KL x 1 TR] 1 101 1 =
Uang Harian Perjalanan Dinas (D.K.I. Jakarta) [1 ORG x 66 KL x 1 TR x 5 HR] 1 101 1 5=
Biaya Penginapan Perjalanan Dinas Pejabat Eselon IV/Golongan III (D.K.I. JAKARTA) [1 ORG x 66 KL x 1 TR x 5 HR] 1 101 1 5=
TOTAL
BALANCE
PERHITUNGAN SPPD PPK 7
AWAL
Satuan Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri (PP) Ekonomi JAKARTA - BANDA ACEH [1 ORG x 9 KL x 1 TR] 1 9 1 =
Uang Harian Perjalanan Dinas (D.K.I. Jakarta) [1 ORG x 9 KL x 1 TR x 5 HR] 1 9 1 5=
Biaya Penginapan Perjalanan Dinas Pejabat Eselon IV/Golongan III (D.K.I. JAKARTA) [1 ORG x 9 KL x 1 TR x 5 HR] 1 9 1 5=
TOTAL
REVISI
Satuan Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri (PP) Ekonomi JAKARTA - BANDA ACEH [1 ORG x 17 KL x 1 TR] 1 18 1 =
Uang Harian Perjalanan Dinas (D.K.I. Jakarta) [1 ORG x 17 KL x 1 TR x 5 HR] 1 18 1 5=
Biaya Penginapan Perjalanan Dinas Pejabat Eselon IV/Golongan III (D.K.I. JAKARTA) [1 ORG x 17 KL x 1 TR x 5 HR] 1 18 1 5=
TOTAL
BALANCE
AWAL
Satuan Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri (PP) Ekonomi JAKARTA - BANDA ACEH [1 ORG x 9 KL x 1 TR] 1 9 1 =
Uang Harian Perjalanan Dinas (D.K.I. Jakarta) [1 ORG x 9 KL x 1 TR x 5 HR] 1 9 1 5=
Biaya Penginapan Perjalanan Dinas Pejabat Eselon IV/Golongan III (D.K.I. JAKARTA) [1 ORG x 9 KL x 1 TR x 5 HR] 1 9 1 5=
TOTAL
REVISI
Satuan Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri (PP) Ekonomi JAKARTA - BANDA ACEH [1 ORG x 17 KL x 1 TR] 1 18 1 =
Uang Harian Perjalanan Dinas (D.K.I. Jakarta) [1 ORG x 17 KL x 1 TR x 5 HR] 1 18 1 5=
Biaya Penginapan Perjalanan Dinas Pejabat Eselon IV/Golongan III (D.K.I. JAKARTA) [1 ORG x 17 KL x 1 TR x 5 HR] 1 18 1 5=
TOTAL
BALANCE
PERHITUNGAN SPPD PPK 8
AWAL
Satuan Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri (PP) Ekonomi JAKARTA - BANDA ACEH [1 ORG x 9 KL x 1 TR] 1 10 1 =
Uang Harian Perjalanan Dinas (D.K.I. Jakarta) [1 ORG x 9 KL x 1 TR x 5 HR] 1 10 1 5=
Biaya Penginapan Perjalanan Dinas Pejabat Eselon IV/Golongan III (D.K.I. JAKARTA) [1 ORG x 9 KL x 1 TR x 5 HR] 1 10 1 5=
TOTAL
REVISI
Satuan Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri (PP) Ekonomi JAKARTA - BANDA ACEH [1 ORG x 17 KL x 1 TR] 1 19 1 =
Uang Harian Perjalanan Dinas (D.K.I. Jakarta) [1 ORG x 17 KL x 1 TR x 5 HR] 1 19 1 5=
Biaya Penginapan Perjalanan Dinas Pejabat Eselon IV/Golongan III (D.K.I. JAKARTA) [1 ORG x 17 KL x 1 TR x 5 HR] 1 19 1 5=
TOTAL
BALANCE
4,492,000 = 296,472,000
530,000 = 174,900,000
610,000 = 201,300,000
672,672,000
4,492,000 = 453,692,000
530,000 = 267,650,000
610,000 = 308,050,000
1,029,392,000
356,720,000
4,492,000 = 40,428,000
530,000 = 23,850,000
610,000 = 27,450,000
91,728,000
4,492,000 = 80,856,000
530,000 = 47,700,000
610,000 = 54,900,000
183,456,000
91,728,000
4,492,000 = 40,428,000
530,000 = 23,850,000
610,000 = 27,450,000
91,728,000
4,492,000 = 80,856,000
530,000 = 47,700,000
610,000 = 54,900,000
183,456,000
91,728,000
4,492,000 = 44,920,000
530,000 = 26,500,000
610,000 = 30,500,000
101,920,000
4,492,000 = 85,348,000
530,000 = 50,350,000
610,000 = 57,950,000
193,648,000
91,728,000
10%
3 PACKAGE No. 3 Reconstruction of National 207,265,999 Belum Kontrak 11,667,563 800,000 12,467,563 40,624,136 996,566 41,620,702 - 41,620,702 28,956,573 196,566 20 %
Road,Section Kebayakan – Sp. Kraft UANG MUKA
TOTAL 623,314,959 402,413,265 35,052,897 2,400,000 37,452,897 119,497,140 2,400,000 121,897,140 39,436,500 804,827 40,241,326 161,333,640 123,880,743 0 -
KETERSEDIAAN DAN KEBUTUHAN
DANA LOAN JICA PADA SATKER PELAKSANAAN WILAYAH 1 ACEH
PADA TAHUN ANGGARAN 2013
(Dalam Ribuan Rupiah)
ALOKASI
LUNCURAN
DIPA TA.2012 DIPA TA.2013
(Rp.) KEBUTUHAN PERCEPATAN
NO. NAMA PAKET (Rp.) TA. 2013 LOAN JICA KET
(Rp.) (Rp.)
20 %
1 PACKAGE No. 1 Reconstruction of National 32,151,499 31,870 32,183,369 11,717,667 800,000 12,517,667 7,884,297 52,585,333 UANG MUKA
Road, Section Sp. Kraft – Batas Aceh Tengah & 10% FISIK
UNTUK
1 PACKAGE No. 1 Reconstruction of National 228,276,876 218,717,677 11,717,667 800,000 12,517,667 42,868,668 874,871 43,743,539 53,787,335 1,097,700 54,885,035 97,530,874 84,938,336 74,871 20 %
Road, Section Sp. Kraft – Batas Aceh Tengah UANG MUKA
& FISIK
UNTUK
PACKAGE No. 2 Reconstruction of National
2 187,772,084 183,695,588 11,667,667 800,000 12,467,667 36,004,336 528,564 36,532,900 36,004,336 734,782 36,739,118 72,537,236 60,341,005 (271,436) 20 %
Road,Section Batas Aceh Tengah - UANG MUKA
Blangkejeren & FISIK
UNTUK
PACKAGE No. 3 Reconstruction of National 20 %
3 249,141,145 Belum Kontrak 11,667,563 800,000 12,467,563 40,624,136 996,566 41,620,702 48,831,665 996,566 49,828,231 90,452,367 77,788,238 196,566
Road,Section Kebayakan – Sp. Kraft UANG MUKA
& FISIK
TOTAL 665,190,105 402,413,265 35,052,897 2,400,000 37,452,897 119,497,140 2,400,000 121,897,140 138,623,336 2,829,048 141,452,384 260,520,476 223,067,579 0 -
DANA BLOKIR
PADA TAHUN ANGGARAN 2013
VOLUME
NO. NAMA PAKET LOKASI NILAI PAGU
EFF STN
1 Pengadaan Bangunan Workshop / Gudang Alat Berat Aceh Besar 1 Unit #REF!
TOTAL #REF!
DANA LOAN JICA PADA SATKER PELAKSANAAN WILAYAH 1 ACEH
PADA TAHUN ANGGARAN 2013
UNTUK
3 PACKAGE No. 3 Reconstruction of National 249,141,145 11,667,563 800,000 12,467,563 36,623,749 747,423 37,371,172 24,956,186 15 %
Road,Section Kebayakan – Sp. Kraft
UANG MUKA