PEKERJMN PENDAHULUAN. 1 Pengukuran dan Pemasangan bowplank m' 113,00 1.349.898DO 14.848.878,00 X 2.2.1.4.

1
2 Pemasangan dan Photo Dokumentasi Is 1.199.107,44 119.910 74 1319.018,19
3 Biaya Penerapan SMKK Is Ipo 13.500.000,00 1.350000,00 14.850000,00 ANAUSASMKK
m2 18 00 875.000,00 1.575.000,00 17.325.000,00
4 Guda Bahan dan Barak K
dan Demobilisasi alat (crane Mobil kap. 3-5 ton utk Is 1,00 Isooo.ooo,oo 1.500.000,m 16.500.000,00
5 Pekerjaan

6 RKENAAN TANAH DAN STRUKTUR BAWAH A PekerjaanTanah rn3 47S2 112.860,00 536.310,72 5.899.417,92 A2.3.1.2
Pek anGalian Tanah manual Galian Tanah Pondasi PI
7 Galian tanah si Type P2 11,50 112.860,00 129.789,00 1.427.679,00 A2.3.L2
8 Galian tanah pondasi menerus m3 17P4 95.737,50 163.136,70 1794.503,70 A2.3.L1
9 U anpasir alas si, Ur an pasir bawah pondasi Type PI 1,58 254.430,00 40.199,94 442.199,34 A2.3.1.1i
050 254.430,00 12.72 50 139.936,50 A2.3.1.11
10 pasir bawah pondasi Type P2
11 Urugan bawah pondasi Batu Kali 213 254.430,00 54.193 596.129,49 A2.3.1.11
12 Pas. Lantai k cam . I : 3 : 5 Pondasi T m3 58 1.257.078 40 198.618 2.184.802 6 A.A.4.1.1.4
13 Type P2 0,50 1.257.078,40 62.853,92 691.393,12 A.A.4.1.L4
14 Tirnbunan kembali m3 55,36 67.650,00 374.510,40 4.119.614,40 A2.3.1.9
15 Pekerjaan cerucuk kayu bulat 10 - 15 cm pjg. 2 - 4 mtr (untuk pondasi 198P0 74.085,00 1.466.883P0 16.135.713,00 Ant. Taksir k

16 O. Pekedaan Bertulatw. 1. Pasarwan Pondasi Plat Beton 5.148.620,00 6.116.560,56 67.282.166,16 Beton a

17 Pas. Pondasi Plat Beton Bertulang Type P2 1,44 4.337.390,00 624.584,16 6.870.425,76 Beton b
18 Pas. Pondasi Batu Belah/Kali I : 4 28,86 1.286. 00 3.713.647 08 4085011738 A3.2.1.2
19 an Pondasi Tangga Beton 016 4.814.640,00 77.034 4 u7.376 64 m
20 PEKERiAAN STRUKTUR TENGAH. i. Pekerjaan Sloof Beton Bertulans uk 9,20 6.190744,40 68.098.188,40 Beun c
20/35 cm (SI)
21 Pas. Sloof Beton Betulan uk. 15/25 an S2) 355 6.48L390,OO 2.365.707,35 26022780,85 Beton d
22 '(obm. 1. Pas. Kolom KI Beton Bertulang Uk. 25/35 3,75 1Œ989.350,oo 4.121.006,25 45.331.068,75 f
Beton

23 Pas. Kolom K2 Beton Bertulang Uk. 20/20 m3 9.907.580,00 1.971.608,42 21.687.692,62


24 Pas. Kolom Praktis (KP) Beton Bertul Uk, 13/13 cm (kies 9.115.230,00 25969,29027 Beton i
25 Pas. k3 Meja Los Beton Bertulang Uk. 13/13 am m3 2,59 2.36Œ844 57 25.969.290,27
26 Pescerj.an Salou 1. Pas. Balok Kios (BI) Uk. 13/20 cm m3 L547.130m 1102.579,77 12.128.377,47 betm k
27 Pas. Balok selasar (82) Uk. 15/20 m3 0,99 7.681.970oo 760.515,03 8.365.665,33 Betm I
28 Pas. Balok entrance(B2) Uk. 15/20 cm m3 OA4 7.681.970oo 338.m6,68 3.718.073 48 BetM' I
29 Plat Beton 1. Pasarvn Plat T Beton Berta 0,38 7.999.020,00 303.962,76 3.343.590.36
30 Pas.Plat R. balkondan R. Turau T. 12 (wiremeh 7.999.020,00 2.751.662.88 3Œ268.291,68 Betonn
dob1eM8
31 Pas. Piat M Bebn Lost. 10 cm 15,00 7.999.020P0 11998530,00 131.983.830,00 Beton n
32 O. StNktw Bap L KI WF 44.649»o 21.531.444,46 236.845.889,08 A4.2.L1

33 1 T. 16mm 136,12 44M9,oo w7.762.19 6.685.3um


44.649 oo 242.756,61 2.670.322,74 A4.2.1.1
34 Ptatbuhul Ri ) 1 T. IOmm 54,37
35 Rip) 4 T. 10 mm 36,24 44.M9,oo 161.o7,98 1.779.887,74 A4.2.L1

36 baut HTB M22 7%nm bh 35.000,00 336.000,00 3.696.000,00


37 Struktur Balok B Besi WF 4.018," 44.649.00 197.371.574,24 A-4.2.1.1
38 Plat buhul (Ri ) I T. 10 mm A.4.2.L1
39 Plat (Rip) 4 T. 10 mm 122,32 44.649,00 546146,57 6.007.612,25 A4.Z1.i
40 Piat (Rip) 10 WF 30Q.1S0 368.711.44 4.055.825,86 A-4.2.1.1
41 Baut HTB M19 bh 192,00 15.000.00 288.000.00 3.16L000,oo
42 3. Bei WF 300.150.6.s,9 5.108,64 44.649,00 22809.56574 250.905.234,10 A.4.2.1.2
43 Plat buhul Ri 1 T. 10 mm 163 10 44.649,00 8.010.477,09 A4.Z1.2
44 Plat buhul (Ri 2 T. 8 mm 41.55 185516,60 2.uo.682,55
45 Platbuhul(Ri )3potonpnWF20Œ.100 19Œ204,74 2.092.252.14 A4.2.L2

46 Platbuhul( T. lomm 144.98 647.321,20 7.120.533,22 A4.Z1.2


47 Plat b%ul (Rip) S WF 176,16 44.649m 786.536 78 8.651.9%62 A4.2.1.2
48 Plat (Rip) 7 WF 300..150 117,44 44649,00 5.767.936,42
49 2 T. 10 mm 81,55 3".112.60 4.005. 55 A4.2.L2

SO Besi endplate 3 T. 10 mm 186,40 44."9P0 832.257,36 9.154.830.96 A4.2.1.2


Baut HTB MIS bh 3u 00 15.ooono 576.000,00
52 bei 10 L/ir "649,00 2.707.693,96 29.784.633,52 A4.2.L2
53 Ik*an besi016 ulirdanperwnd L506 52 44."9P0 6726.461.15 73.991.07253 A4.2.L2
besi siku SO 209,76 93'557 2 A.4.2.L2
55 4. KonsolTedtis.n Besi »uOO.S.S,8 408,96 44.M9P0 1.825.965,50 20.085.620,54 A.4.2.X1
s. KanamPIOO 2.885 72 44.649P0 12.su.45i,23 14L72A%3Si A4.Z1.i
57 6. W'. 200.100.5.s,8 1.405,80 44.%00 6.2767% 2 69N4.320,62
(Np) i T. 10 mm 2718 44.649D0 121.355,98 1.334.915,m
58
59 Piat (Np) 2 T. 8 mm 2078 44M9,oo 92.780,62 1.02QS86,U A.4.2.1.1
60 (Rip 6 T. 8 mm 46390 i 5iŒ293,42 A4.2.L1
61 4 T. 8 mm 31,17 44.649 oo 139.170,93 1.5n•o.26
62 M 16 bh 96m 10.mo 96.000,00
63 PeeJAAN ONDING i. Pekerjaan Pasar.n 1/2 325.33 IE.%1.7S '10025,61 67.90.281.74

64 i/2 Bau Kios m2 117 189.% 75 2.237.749,42 24.615.243,57 A4.4.i.9


65 1/2 Los amp. 1 : 4 m2 254,70 189.% 75 4.838.325 77 A4.4L9
66 1/2 Bata 1 : 4 balo& wf +3.2 ma i 12 189.961.75 3.269.621.64 A4.4.i.9
67 2. PekerjaanPelapis dv' ad utamabarwnan m2 573,86 8'958,30 4.99Œ189m A4.4.2.4

68 "os 1:4 m2 23SS1 8058,30 2.N8.824,51 22.537.069,57 A4.4.2.4


69 ad m2 9810 853.060,92 S383.m1S A4.4.24
70 Pas. KM/WCIJk. 25 x m2 64,54 378.17 75 2.44Œm47 26.847. X44.3.%a
71 w'Atuk Uk. 25 x 40 m2 12 6 378.17 75 463.638,57 E100024,22 A4.4.3.S4.a
72 Pas mep les keramik Uk. 2S 40 ma 16660 378,17 75
73 Baa 1 : 4 Watas balok wf +3.2 344 25 86.958,30 2.993.539,48 32.92L9%2S A"2.4
74 1. keramik uk 40 x 40 moef m2 577,50 m997,50 17.324.855,63 190.573.411,88 A.44.S.3S.a

7S P" 1.30 Keramik 40 x 40 m2 8,23 299.997 246.897* 2715.877 37 A4.4.us.


40 x 40
77 PW Kerarnik 40 x m2 299.997 1.439.98LOO 15839.sss,m
PW Kervnik'A. 40 40 an ma 3 299.997 94.499 21 1039.491.34
79 Pu. kerunik x 40 KM/WC m2 299.997 539.9%.so "39.95050
80 Pa. 40 40 selasu ma 56.25 299.997 so 1.687.as iL562.S4S
i
81 PK LanwKeunik 40 40 selasu m2 46 7 299.997 so 1.406088.28 AQ4.3.3S.a
82 40 40 m2 2".997 x«xss..