PEKERJAAN PENDAHULUAN. I Pengukuran dan Pemasangan bowplank m' 113,00 119.460,00 1.349.898,00 14.848.878,00 x 2.2.1.4.

1
nama oyek dan Photo Dokumentast Is 1,00 1.199.107,44 119.910,74 1.319.018,19
2 Pemasangan pa
Is 1,00 13.500.000,00 1.350.000,00 14.850000,00 ANALISA SMKK
3 Biaya Penerapan SMKK
18,00 875.000.00 1.575.000.00 17.325.000,00
4 Gudang Bahan dan Barak Ker
S Pekerjaan Moboltsasi dan Demobilisasi alat (crane Mobil kap. 3-5 ton utk Is 1,00 15.000.000,00 1.500.000,00 16.500.000,00
erectionran ka ba
m3 47,52 112.860,00 536.310,72 5.899.417,92 A-2.3.1.2
6 PEKERJAAN TANAH DAN STRUKTUR BAWAH A Pekerjaan Tanah
Peke an Galian Tanah manual Galian Tanah Pondasi T PI
11,50 112.860,00 129.789,00 1.427.679,00 A 2.3.1.2
7 Gallan tanah pondasi Type P2
8 Galian tanah pondasl menerus m3 17,04 95.737,50 163.136,70 1 794 503,70 A.2.3.1.1
9 Urugan pasir alas pondasi, Ur an pasir bawah pondasi Type PI m3 1,58 254.430,00 40.199,94 442.199,34 A2.3.1.11
U an pasir bawah pondasi Type P2 0,50 254.430,00 12.721,50 139.936,50 A.2.3.1.11
II Urugan pasir bawah pondasi Batu Kali m3 2.13 254.430,00 54 193,59 596.129,49 A2.3.1.11
12 Pas. Lantai ker a cam . I : 3 : 5 Pondasi T 158 1.257.078 40 198.618 39 2.184.802 6 AA4.1.1.4
13 Pondasi Type PZ m3 0,50 1.257.078,40 62.853.92 691.393,12 AA.4.1.1.4
14 T•mbunan kembali 55,36 67 650,00 374.510,40 4.119.614,40 A.2.3.1 9
15 Pekerjaan cerucuk kayu bulat 10 - 15 cm pj8. 2 - 4 mtr (untuk pondast titt 198,00 74.085,00 1.466.883P0 16.135.713,00 Anl. Taksir k
setem t
16 B. Pekerjaan Pondasl Beton Bertulang. I. Pasangan Pondasi Plat Beton 11,88 5.148.620,00 6.116.560,56 67.282166,16 Beton a
Bertula t PI
17 Pas.Pondasi Plat Beton Bertulang Type P2 m3 1,44 4.337.390,00 624.584,16 6.870.425,76 Beton b
18 Pas. Pondasi Batu Belah/Kali I : 4 m3 28,86 1.286780,00 3.713.647,08 40.850.117,88 A3.2.1.2
19 Pasangan Pondasi Tangga Beton m3 0,16 4.814.640,00 77.034,24 847.376,64 Beton m
20 PEKERJAAN STRUKTUR TENGAH. 1. Pekerjaan Sloof Beton Bertulang uw m3 9,20 6.729.070,00 6.190.744,40 68098.188,40 Beton c
20/35 cm (SI)
21 Pas Sloof Beton Betuiang uk. IS/2S S2) m3 3,65 6.481 390,00 2.365.707,35 26.022.780,85 Beton d
22 Pekerjaan Koiom. 1. Pas. Kolom KI Beton Bertulang Uk. 25/35 an m3 3,75 10.989.350,00 4.121.006,25 45.331.068,75 Betonf

23 Pas. Kolom K2 Beton Bertulang Uk. 20/20 cm m3 1,99 9.907.580,00 1.971.608,42 21.687.692,62 Beton
24 Pas. Kolom Praktis (KP) Beton Bertulang Uk. 13/13 cm (kios ma 2,S9 2.360.844,S7 Beton i
25 Pas. Kolom k3 Meja Los Beton Bertulang Uk. 13/13 cm 2,59 9.115.230,00 2.360.844,57 25.969.290,27
26 Pekerjaan Balok 1. Pas. Balok Kios (BI) Uk. 13/20 cm m3 1,29 8.547.130,00 1.102.579,77 12.128.377 beton k
27 Pas. Balok selasar (B2) Uk. 15/20 cm m3 0,99 7.681.970 oo 760.515,03 8.365.665,33 Beton I
28 Pas. Balok entrance(B2) Uk. 15/20 cm m3 0,44 7.681.970,00 338.006,68 3.718.073,48 Beton I
29 Pekerjaan Plat Beton I. Pasangan Plat Tangga Beton Bertulang m3 0,38 7.999.020,00 3.343.590,36 Beton n
30 Pas.Plat Lantai R. Pengelola balkon dan R. Tunggu T. 12 cm (wiremesh 3,44 7.999.020,00 2.751 662,88 30268291,68 Beton n
dobie M 8
31 Pas. Plat Meja Beton Los t. 10 cm m3 15,00 7.999.020P0 IL998.S30,OO 131 983.830,00 Beton n
32 B. Pekehaan Struktur Baja KonvensionalI. Kolom Struktur Ki Besi WF 4.822,38 21.531.444,46 236.845.889,08 A4.2.1.1
300.150.659
33 Besi endplate 1 T. 16 mm 136,12 44.649,00 w7.762,i9 6.685.384,07 A.4.2.L1
34 Plat buhul Rip) I T. 10 mm 54,37 44.649,00 242.756,61 2.670.322,74 A4.2.1.1
35 Plat buhul (Rip) 4 T. 10 mm 36,24 44.649,00 161.807,98 1.779.887,74 A4.2.1.1
36 Angkur baut HTB M22 panjang 750mm bh 96,00 35.000,00 336.000,00 3.696.000,00
37 2. Struktur Balok B Besi WF 300.150.6.5,9 4.018,65 44.649.00 17.942.870,39 197.371.574,24 A4.2.1.1
38 Plat buhul (Rip) I T. 10 mm 176,69 44.649,00 788.903,18 8.677.934,99 A4.2.1.1
39 Plat buhul (Rip) 4 T. 10 mm 122,32 44.649,00 546.146,57 6.cm.612.25 A4.2.1.1
40 Piat buhul (RIP) 10 an WF 300..150 82,58 44.649,00 368.711.44 4.055.82536 A-4.2.1.1
41 Baut HTB M19 bh 192,00 15.000,00 288.000,00 3.168.000,00
42 3. Kuda - kuda Baja Besi WF 30Œ150.6.5,9 5.108,64 44.649,00 22.809.566,74 250.905.234,10 A.4.2.1.2
43 Plat buhul Rip 1 T. 10 mm 163,10 44.649,00 728.225 19 8.010.477,09 A4.2.1.2
44 Plat buhul (Rip) 2 T. 8 mm 41,55 44.649,00 185.516,60 2.040.682,55 A4.2.1.2
45 Plat buhul (Rip) 3 potongan WF 200..100 428) 44.649,00 190.204,74 2.092.252,14 A4.2.L2
46 Plat buhul (Rip) 4 T. 10 mm 144.98 44.649,00 647.321,20 7.120.533,22 A4.2.1.2
47 Plat buhul (Rip) 5 pot anWF 300.150 176,16 44.649,00 786.536,78 8.651.904,62 A4.2.1.2
48 Plat behul (Rip) 7 WF 300,150 44649,00 524,3S7B6
49 Bes endvAate 2 T. 10 mm 81,55 44.649,00 364.112,60 4.005.238 55 A.4.2.L2
50 Besi endplate 3 T. 10 mm 186,40 44.649,00 832.257,36 9.154.830,96 A4.2.L2
51 Baut HTB MIS bh 384,00 15.000,00 576.000,00
52 Trackstank besi 10 dengan ulir 606,44 44.649,00 2.707.693,96 29.784.633,52 A.4.2.1.2
53 Ikatan Angin besi 16 lengkap n ulir dan pengunci kg 1506,52 44.649,00 6.726.461,15 73.991.072,63 ".2.1.2
54 Dudukan ording besl siku SO 209,76 44.649,00 936.557,42 10.302.131,66 A.4.21.2
55 4. Konsol Terttisan Besi WF 200100.S.S,8 408,96 44.649,00 1.825.96550 20.085.620,54 A-4.2.1.1
56 5. Gordi KanalCNP 100 2.885,72 44.649,00 12.8u.451,23 14172896351 A4.2.1-1
57 6. Balok Besi WE. 200.100.5.5,8 1.405,80 44.649,00 6.276.756,42 69.044.320,62 A4.2.1.1
58 Plat buhul (Rip) I T. 10 mm 27,18 44.649,00 121.355,98 1.334.915,80 A42.1.1
59 Plat buhul (Rip) 2 T. 8 mm 20,78 44.649,00 1.020.586S4 A-4.2.1.1
60 Plat buhul (Rip) 6 T. 8 mm 10,39 44.649,00 46.390,31 510.293,42 A4.2.1.1
61 Besi endplate 4, T. 8 mm 31,17 44.649,00 139.170,93 1.530.880,26 A4.2.L1
62 Baut HTB M 16 bh 96,00 10.000,00 L056.ooo,oo
63 PEKERJAAN 01NDtNG1. Pekerpan Dinding Bata, Pasangan 1/2 bata m2 325,33 189.961,75 6.180.025,61 67.980.281,74 A-4.4.1.9
unan '„Rama
64 Pasangan 1/2 Bata Kios camp. 1 : 4 m2 117,80 189.961,75 2.237.749,42 24.615.243,57 A4.4.1.9
65 1/2 Meja Los camp. 1 : 4 m2 254,70 189.961,75 4.838.325,77 53.221.583,50 X4.41.9
66 pa an 1/2 Bata 1 : 4 (diatas balok wf +3.2) m2 17 12 189.961,75 3.269.621,64 35965838,05 A-4.4.1.9
67 2. Pekerpan Pelapis Dindlng. Pelesteran dan aci dinding utama bangunan m2 573,86 86.958,30 4.990189.00 54.892.079P4 A4.4.2.4
cam .
68 Piesteran dan aci dindtng kios 1 •4 m2 235,61 86.958.30 2.048.824,51 22.537.069,57 A.4.4-2.4
69 Plesteran dan ad dindi los 1 : 4 m2 98 10 86.958,30 853.060,92 9.383.670,15 A4.4.24
70 Pas keramik KM/WC IJk. 25 x 40 cm m2 64,54 378.171,75 2.440.720,47 26.847.925,22 A4.4.3.54.a
71 Pas. di wudhuk keramik Uk. 25 x 40 cm 12,26 378171,75 463.638,57 s.100.024,22 A4.4.3.S4.
72 Pas. dinding meja les keramik ZS 40 cm m? iS6,60 378.171,75 s.922.169,61 6"48.86566 A44.3.S4a
73 Plesteran Bata 1 : 4 (diatas bak* wf +3.2 m2 344 25 86.958,30 2.993.539.48 32.928.934,25 A.44Z4
74 %KERJA.AN LANTAI. 1. lanta•keramik uk 40 x 40 crn motif kasar m2 577,50 299.997,50 17.324.855,63 190.573.411,88 A44.3.3S.a
los
TS Pas. Lantai Keramik uk 40 x 40 kesehatan/m m2 8,23 299.997,50 246.897,94 x 715.877,37 A4.O3S.
PaOantaiKeramik uk 40 x 40 cm Tera Ukur m 8 23 299.997so 46.897 94 .7 5.877 37 A4. . 3S.
77 Pas. Lanta Keramik uk 40 x 40 cm 48,00 299.997,50 1.439.988,00 1'839.868.00 A4.4.i3Sa
78 Pas Lantai Keramik uk. 40 x 40 cm m2 3,15 299.997.so 94.499,21 1.039 491,34
79 Pas. Lantai keramik uk 40 x 40 KM/WC 18,00 299.997 so 539.99S.so s 939.950,50 AQ4.3.3s-a
80 Pas. Lantaakeramik uw 40 40 selasar depan m2 56,25 299.997,50 1.687.485,94 iLS62.34S,3i A4.4.3.3Sa
81 Pas Lantai Keramik uk. 40 x 40 cm selaw m2 46,87 299.997,50 1.406.œ8,28 15466971,11 A4.4.3.3S.a
82 Pas keramii 40 40 (kasar m2 14,00 29' "7,50 X".3.SS.a