I PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank 1.000 Ls 1,524,000.00 1,524,000.00
2 Pembersihan Lokasi 1.000 Ls 500,000.00 500,000.00
JUMLAH I 2,024,000.00
II PEKERJAAN TANAH
1 Galian Tanah Biasa 8 126.000 M3 56,000.00 7,056,000.00
2 Urugan Pasir dipadatkan 12 4.200 M3 279,000.00 1,171,800.00
JUMLAH II 8,227,800.00
1/2
HARGA SATUAN JUMLAH HARGA
No. PEKERJAAN NO. ANALISA VOL SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6 7
JUMLAH IV 108,451,032.60
V PEKERJAAN PLESTERAN
1 Pek. Plesteran Camp. 1:2 Tebal 10 mm 46 42.600 M2 66,962.00 2,852,581.20
2 Acian 47 408.600 M3 21,930.00 8,960,598.00
2 Pek. Rabat Beton Camp. 1:3:5 di Sekeliling Reservoir 30 6.300 M3 1,200,500.00 7,563,150.00
JUMLAH V 19,376,329.20
JUMLAH VI 17,400,000.00
2/2