NO KETERANGAN Spek Material UNIT HARGA JUMLAH


1 Bak Kontrol & Ventilasi area basement Niro Granito 30x30 8.00 bh 1,250,000.00 10,000,000.00
2 Gutter I Niro Granito 30x30 8.00 m2 435,000.00 3,480,000.00
3 Gutter II Niro Granito 30x30 8.00 m2 435,000.00 3,480,000.00
4 Bongkaran Rubahan termasuk penebalan dinding pada Kanopi dn Penebalan 1.00 ls 12,500,000.00 12,500,000.00
KT. Anak 1, Pantry & Kongliong antara WIC KT. Utama

5 Ground Tank Profil 1100l + inatalasi 1.00 unt 3,250,000.00 3,250,000.00


6 Tambah Daya sudah termasuk Balik Nama rubah 1phase ke 3phase 13,000.00 wtt 2,000.00 26,000,000.00
7 Pasang PAM 1.00 ls 1,250,000.00 1,250,000.00
8 Pemasangan PGN * 1.00 ls 3,250,000.00 3,250,000.00
-
63,210,000.00

Total 63,210,000.00
Fee 10.0% 6,321,000.00
Grand Total 69,531,000.00
Note :
Jakarta, 16 Oktober 2017
* beum termasuk pipa penyambungan dari rumah ke pipa PGN

Ir. Veronica Warastri W


Jl. Pulomas Selatan No. 1-2, Kel. Kayu Putih, Kec. Pulo Gadung, Jakarta Timur
Telp. (021) 47860144, 4703746, Fax. (021) 47860151
RAB JL DANAU POSO 158
FINISHING TAMBAHAN IV

NO KETERANGAN Spek Material UNIT


1 Bak Kontrol & Ventilasi area basement Niro Granito 30x30 8.00 bh
2 Gutter I Niro Granito 30x30 8.00 m2
3 Gutter II Niro Granito 30x30 8.00 m2
4 Bongkaran Rubahan termasuk penebalan dinding Kanopi dn Penebalan 1.00 ls
pada KT. Anak 1, Pantry & Kongliong antara WIC KT.
Utama

5 Anti Rayap RT. Utama, RT anak 1 & 2 Stedfas 3.00 kmr


6 Ground Tank Profil 1100l + inatalasi 1.00 unt
7 Tambah Daya sudah termasuk Balik Nama rubah 1phase ke 3phase 13,000.00 wtt

Total
Fee 7.5%
Grand Total

Catt. Belum termasuk


Atap Polycarbonat + rangka Atap lt dak jemur
Kaca Patri Pembatas Kmr Anak dn Kmr Tdr Utama
Rel Henderson
Yamaha Water Purrifer
HARGA JUMLAH
750,000.00 6,000,000.00
185,000.00 1,480,000.00
185,000.00 1,480,000.00
12,500,000.00 12,500,000.00

550,000.00 1,650,000.00
2,750,000.00 2,750,000.00
2,000.00 26,000,000.00
-
51,860,000.00

51,860,000.00
5,186,000.00
57,046,000.00

Jakarta, 23 Agustus 2011

Dudi Sadewo
prsntse a g u s t u s
NO URAIAN PEKERJAAN SPESIFIKASI RINGKAS
% 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2
I PEKERJAAN PENUNJANG PROYEK :
1 Listrik Kerja Daya P L N / Generator 0.334
2 Keamanan Selama Kerja 0.445
3 Foto Dokumentasi/Administrasi 0.028

II PEKERJAAN PELAPIS DINDING :


B LANTAI BAWAH
1 Dinding Toilet Marmer Mauritius Brown (S B 0.632
2 Meja & Dinding Dapur Marmer Labradorite Antiq ( S 0.261
3 Meja & Dinding Pantry Marmer Labradorite Antiq ( S 0.355
C LANTAI ATAS
1 KM/WC Utama Marmer Slate Black (S B O) 1.895
2 KM/WC Anak Marmer Slate Black (S B O) 0.980
D TAMPAK LUAR
1 Dinding Luar Garasi & Tebing Taman Batu Alam Random Split 1.815
2 Dinding Luar Pagar Depan Batu Alam Random Split 0.436
3 Profil Atas Dinding Pagar Depan Sesuai Gambar 0.329
4 Dinding Marmer Exp. Tampak Depan Marmer (S B O) 1.047

III PEKERJAAN PLAFOND :


1 Plafond Lambrisering Rangka Besi Hollow 3.549

IV PEKERJAAN LANTAI :
A LANTAI BASEMENT
1 Ram Carport Batu Andesit Variasi Dimensi 1.722
B LANTAI BAWAH
1 Teras depan Marmer Mauritius Brown (S B 0.254
2 R. Tamu Marmer Empire Beige SP Extr 0.331
3 Border R. Tamu Marmer Emperador Dark Extr 0.386
4 R. Keluarga Marmer Moreno Beige Extra ( 2.696
5 R. Makan Marmer Crema Luna (S B O) 0.329
6 Border R. Makan Marmer Labradorite Antiq ( S 0.256
7 Pantry Marmer Labradorite Antiq ( S 0.164
8 Dapur Marmer New Omega Beige (S 0.438
10 Tangga Utama Marmer Moreno Beige Extra ( 0.723
11 Toilet Marmer Mauritius Brown (S B 0.123
12 Teras Belakang Marmer Slate Black (S B O) 0.186
13 Penutup Void Teras Belakang Grill Besi Finishing Cat 0.919
14 R. Belajar (SCREDD) Scred lantai untk kayu 0.132
15 R. Bermain (SCREDD) Scred lantai untk kayu 0.157
16 Plint Lantai Marmer T=10cm Marmer Mauritius Brown (S B 0.085
Marmer Emperador Dark Extr 0.341
Marmer Mareno Beige Extra ( 1.382
Marmer New Omega Beige (S 0.268
Marmer Labradorite Antiq ( S 0.378
Marmer Slate Black (S B O) 0.158
C LANTAI ATAS
1 K. Tidur Utama (SCREDD) Scred lantai untk kayu 0.272
2 K. Tidur Anak 1 (SCREDD) Scred lantai untk kayu 0.128
3 K. Tidur Anak 2 (SCREDD) Scred lantai untk kayu 0.132
4 W I C K. Tidur Utama Marmer Moreno Beige Extra ( 0.570
5 KM/WC Utama (LANTAI) Marmer Master Piece (S B O) 0.379
(SHOWER) Marmer Slate Black (S B O) 0.079
6 KM/WC Anak (LANTAI) Marmer Emperador Dark Extr 0.167
(SHOWER) Marmer Slate Black (S B O) 0.053
7 Balkon Marmer Moreno Beige Extra ( 0.175
8 R. Duduk Marmer Moreno Beige Extra ( 1.412
9 Plint Lantai Marmer T=10cm Marmer Moreno Beige Extra ( 0.828
Marmer Moreno Beige Extra ( 0.207

V PEKERJAAN PENGECATAN :
1 Cat Dinding Dalam ex Dulux 3.282
2 Cat Dinding Luar ex Dulux Weathershield: Morn 0.862
3 Cat Kolom & Listplank ex Dulux Weathershield: Day 0.713
4 Melamic Plafond Lambrisering ex Impra 0.710
5 Melamic Toping Railing Tangga Utama ex Impra 0.193
6 Cat Plafond Gypsum ex Dulux 1.228
7 Cat Plafond Beton Exposed ex Dulux 0.517
8 Cat Plafond GRC ex Dulux 0.069
9 Cat Listplank ex Kansai Paint 0.153
10 Coating anti lumut batu alam Sicosol 1.023

VI PEKERJAAN RAILING TANGGA/ BALKON :


1 Railing Tangga Utama & R. Bermain Besi Hollow Finishing Cat 2.511
2 Toping R.Tangga Utama & R. Bermain Profil Kayu Jati Ø 8cm 3.219
3 Railing Tangga Service Besi Hollow Finishing Cat 2.425
4 Railing Teras Besi Hollow Finishing Cat 0.304
5 Railing Balkon Depan Besi Hollow Finishing Cat 0.430
6 Railing Balkon Belakang Besi Hollow Finishing Cat 0.529

VII PEKERJAAN INSTALASI AIR :


1 2 FILTER DN 1 BOOSTER MENUNGGU PEMILIHAN B 0.000
2 Pompa Groundtank Sanyo 250 watt + Instalasi 0.522
3 Pompa Dorong Sanyo 100 watt + Instalasi 0.209
4 Pompa Distribusi Sanyo 100 watt + Instalasi 0.418
5 Stop Valve ex Kitz 1" 0.574

VIII PEKERJAAN INSTALASI LISTRIK :


1 Instalasi Soket Data Kabel 2 Peer ex Supreme + Cl 0.046
2 Box Telepon Standard Telkom 0.042
3 Instalasi Stop Kontak Power Point NYM 3x2.5mm ex Supreme + 0.264
0.000
4 Instalasi Exhaust Fan NYM 3x2.5mm ex Supreme + 0.106
0.000
5 Fitting Titik Lampu Plafond Downlight 1.148
Downlight Halogen 0.049
Dua Downlight Halogen 0.063
Uplight 0.365
Lampu Baret 0.045
Penggantung Lampu Kristal 0.017
Lampu Pendant 0.230
Recessed Mounted 0.383
Surface Mounted 0.113
Lampu Dinding 0.042
Lampu Spot 0.522
Lampui Pagar 0.115
6 Saklar 1 Gang ex Panasonic 0.058
ex Btcino 0.670
7 Saklar 2 Gang ex Panasonic 0.058
ex Btcino 1.558
8 Saklar 4 Gang ex Btcino 0.436
9 Saklar Hotel 1 Gang ex Panasonic 0.056
ex Btcino 0.545
10 Saklar Hotel 2 Gang ex Btcino 1.401
11 Stop Kontak Dinding ex Panasonic 0.088
ex Btcino 5.977
12 Stop Kontak Lantai ex Btcino 0.239
13 Stop Kontak Power Point ex Btcino 0.980
14 Soket T V ex Btcino 1.187
15 Soket Telepon ex Btcino 0.528
16 Soket Data ex Btcino 0.236
17 Exhaust Fan ex Panasonic 0.251
18 Outlet Water Heater ex Btcino 0.294
19 Outlet A C ex Btcino 0.784
20 C C T V Monitor MENUNGGU PEMILIHAN B 0.000
21 C C T V Camera ex Panasonic type 14-03 1.726
22 DVD-R MENUNGGU PEMILIHAN B 0.000
23 Kabel Toevoer NYM 4 x 12 mm ex Supreme + 0.429
IX PEKERJAAN ACCESSORIES SANITAIR (S B O) :
1 Closet Monoblock Upah & Spesi 0.104
2 Jetwasher Upah & Spesi 0.010
3 Hand Shower Upah & Spesi 0.021
4 Shower Box KM/WC Upah & Bahan 0.626
5 Washtafel Upah & Spesi 0.104
6 Meja Washtafel Upah & Spesi 0.125
7 Kran Washtafel Upah & Spesi 0.010
8 Kaca Cermin Wastafel BAHAN + BINGKAI SPT MN 0.271
9 Kitchen Zink Dapur & Pantry Upah & Spesi 0.084
10 Kran Kitchen Zink Upah & Spesi 0.007
11 Floor Drain KM/WC & T. Jemur/ Balkon Upah & Bahan 0.390
12 Tempat Tissue Upah & Spesi 0.021
13 Tempat Sabun Upah & Spesi 0.021

X PEKERJAAN HALAMAN & AKHIR :


1 Pintu Gerbang Pagar Depan Besi Solid Variasi Hollow 1.818
2 Pembersihan Rutin Selama Kerja 0.334
3 Pembersihan Akhir Buang Puing 0.209

NO KETERANGAN
1 PEKERJAAN TAMAN BELAKANG
Penebalan Dinding 0.772
Batu Alam 1.148
Pasangan Glassblock 0.426
Pedestal Tanaman 0.209
2 PEKERJAAN PENUTUP TAMAN BELAKANG
Pekerjaan Dinding 0.104
Krepyak Penutup Dinding Atap Laminated 0.313
Atap Kaca Laminated 1.719
Rangka Besi Atap Kaca 0.452
3 Glassblock Tangga Atas 0.306
4 Glassblock Tangga Bawah 0.557
5 Kaca Kanopi Carport + Rangka 0.633
6 Krepyak Almunium R Service Atas 1.183
7 PEKERJAAN BESI
Pintu Besi R Service Atas 0.257
Tralis Jendela Service 0.905
Tralis Jendela R Bermain 0.244
Trali Jendela R Belakang 0.543
Tralis Kaca Laminated 0.689
8 Ruang Kolong Tangga 0.348

1 Meja Wsafel Ongkos pasang 0.257


2 Trap Depan Teras Granit Bakar+bahan 0.500
3 Tiang Tangga Jati + bahan 0.257
4 Melamic Tiang Tangga 0.035
5 Pekerjaan Besi
Pintu Besi Krepyak Besi Plat 0.278
Tralis Jendela R Panel 0.090
Tralis Depan Jendela R Tamu 0.209
0.278
Jendela WIC dn WC 0.418
Jendela KT Utama 0.710
0.209
6 Tombak Pengaman
Tombak Besi Y Pagar Tembok Depan 0.517
Tombak Besi Y Pagar Depan Ki - Ka 2.443
Kawat Duri Pagar Depan Ki-Ka 0.416
Tombak besi L Kiri - Kanan - Belakang 4.750
7 Handel Custom Besi Plat 0.244
8 Handel Decson Setara Body dn Kunci SES 0.633
9 Engsel SES 13' 1.030
Engsel SES 14' 1.114
8 Keramik Lantai Dak Niro Granit 60x60 1.770
100.000
s e p t e mb e r o k t o b e r
3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7