Anda di halaman 1dari 1

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL BINA MARGA

PERHITUNGAN VOLUME LALU LINTAS MANUAL


No. Pos Tanggal : _____________________
Nama Jalan Hari : _____________________
dari ke Surveyor : _____________________

1 2 3 4 5A 5B 6A 6B 7A 7B 7C 8
waktu Cuaca*
(15 menitan)

Angkutan Umum, Truk 2 as (blkg Truk 2 as (blkg


Sepeda Motor, Roda 3 Sedan, Jeep, Taxi Mikrolet Pick-Up, Mobil Box Bus Kecil Bus Besar 2ban) 4ban) Truk 3 as Truk 4 as Truk ³ 5 as (Trailer) Tdk Bermotor

Cuaca* : 1. Cerah 3. Mendung


Petugas :........................... Paraf :...............................… Supervisor :..................... Paraf :...............................… 2. Gerimis 4. Hujan

Anda mungkin juga menyukai