Anda di halaman 1dari 47

BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG INSTALASI UNIT GAWAT DA
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : UITSET DAN PASANGAN BOUWPLANK


VOLUME REALISASI : M1

MENGETAHUI,
RUMAH SAKIT UMUM DAERAH SABU
KABUPATEN SABU RAIJUA
PEJABAT PEMBUAT KOMITMEN

MERRY Ch. MORU, SST


Penata Muda III/B
Nip. 19741225 199803 2 001
DAERAH (RSUD)
NG INSTALASI UNIT GAWAT DARURAT (UGD)

N BOUWPLANK

DI SETUJUI, DI BUAT OLEH,


KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
CV. PUTRA TIMOR RAYA CV. BAKU SARANA
(Perwakilan Sabu Raijua)

SILVESTER PRIMUS VELYKS DETHAN


Inspector Pelaksana
I BUAT OLEH,
RAKTOR PELASANA
BAKU SARANA

VELYKS DETHAN

MERRY Ch. MORU, SST


Penata Muda III/B
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : UITSET DAN PASANGAN BOUWPLANK


1
VOLUME REALISASI : 135,70 M

DIMENSI
VOLUME
RUMUS PANJANG LEBAR SKETSA
(M) (M) (M1)
2 3 4 5=3+4 6

V = (2 x P + 2 X L) 43,85 24,00 135,70

Keterangan
V = Volume
P = Panjang
L = Lebar

JUMLAH 135,70

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : GALIAN PONDASI DAN GALIAN SALURAN KELILING BANGUNAN
VOLUME REALISASI : 414,00 M3

RUMUS :
V = LxlxH

Keterangan
V = Volume
L = Panjang
l = Lebar
H = Tinggi

DIMENSI GALIAN
VOLUME
NO URAIAN PEKERJAAN GALIAN PANJANG TINGGI LEBAR SKETSA
(M) (M) (M) (M3)
1 2 3 4 5=3+4 6

1 GALIAN PONDASI JALUR 343,65 1,00 1,20 412,38

2 GALIAN PONDASI ROLAG 10,80 0,30 0,50 1,62

JUMLAH 414,00

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : URUGAN TANAH BEKAS GALIAN


VOLUME REALISASI : 141,93 M3

RUMUS :
V = 2 sisi timbunan x A x L
A = 0.50 x (a + b) x H
Keterangan
V = Volume a = Lebar penampang atas urugan
A = Luas Penampang b = Lebar penampang Bawah urugan
L = Panjang
H = Tinggi

DIMENSI TIMBUNAN LUAS


VOLUME
NO URAIAN URUGAN LEBAR ATAS LEBAR BAWAH TINGGGI PANJANG PENAMPANG SKETSA
(M) (M) (M) (M) (M2) (M3)
1 2 3 4 5 6 7 8

URUGAN BEKAS GALIAN PONDSI MENERUS 0,39 0,20 0,70 343,65 0,21 141,93

JUMLAH 141,93

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : URUGAN PASIR BAWAH PONDASI


VOLUME REALISASI : 41,24 M3

RUMUS :
V = L xlxH

Keterangan
V = Volume
L = Panjang
H = Tinggi
l = Lebar

DIMENSI URUNGAN PASIR


VOLUME
NO URAIAN PEKERJAAN PANJANG LEBAR TINGGI SKETSA
(M) (M) (M2) (M3)
1 2 3 6 7 8 9

URUGAN PASIR BAWAH PONDASI 343,65 1,20 0,10 41,24

JUMLAH 41,24

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : URUGAN TANAH PENINGGI PEIL LANTAI


VOLUME REALISASI : 104,92

RUMUS :
V = A Rata2 x H
A Rata2 = 0,50 x (A1 + A2)
Keterangan
V = Volume
A rata2 = Luasan rata-rata
A1 = Lasan sisi atas
A2 = Lusan sisi bawah
H = Tinggi

LUAS LUASAN LUASAN TINGGI


VOLUME
NO KODE POSISI PENEMPATAN URUGAN SISI ATAS SISI BAWAH RATA-RATA SKETSA
(M2) (M2) (M2) (M1) (M3)
1 2 3 6 8 9

A 28,37 25,66 27,01 0,32 8,64


B 2,41 3,30 2,85 0,32 0,91
C 20,10 17,47 18,79 0,32 6,01
D 20,48 18,11 19,29 0,32 6,17
E 11,73 10,01 10,87 0,32 3,48
F 15,81 13,71 14,76 0,32 4,72
G 2,15 1,50 1,83 0,32 0,59
H 2,15 1,50 1,83 0,32 0,59
I 15,81 13,71 14,76 0,32 4,72
J 15,16 13,61 14,38 0,32 4,60
K 13,55 11,55 12,55 0,32 4,02
L 23,22 20,87 22,04 0,32 7,05
M 1,50 2,15 1,83 0,32 0,59
N 3,16 32,22 17,69 0,32 5,66
O 15,16 13,61 14,38 0,32 4,60
P 15,81 13,71 14,76 0,32 4,72
Q 2,15 1,50 1,83 0,32 0,59
R 2,15 1,50 1,83 0,32 0,59
S 15,81 13,71 14,76 0,32 4,72
T 2,15 1,50 1,83 0,32 0,58
U 35,12 32,22 33,67 0,32 10,77
V 12,57 11,04 11,80 0,32 3,78
W 35,12 32,22 33,67 0,32 10,77
X 2,15 1,50 1,83 0,32 0,59
Y 5,41 4,60 5,00 0,32 1,60
Z 12,81 11,25 12,03 0,32 3,85

JUMLAH 104,92

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : URUGAN PASIR BAWAH LANTAI


3
VOLUME REALISASI : 63,32 M

RUMUS :
V = AxH

Keterangan
V = Volume
A = Luasan
H = Tinggi

LUAS TINGGI VOLUME


NO KODE POSISI PENEMPATAN URUGAN URUGAN URUGAN URUGAN SKETSA
2 1
(M ) (M ) (M3)
1 2 3 8 9

A 12,05 0,15 1,81


B 23,60 0,15 3,54
C 23,60 0,15 3,54
D 31,15 0,15 4,67
E 31,15 0,15 4,67
F 15,81 0,15 2,37
G 2,15 0,15 0,32
H 2,15 0,15 0,32
I 15,81 0,15 2,37
J 15,16 0,15 2,27
K 13,55 0,15 2,03
L 23,22 0,15 3,48
M 1,50 0,15 0,23
N 3,16 0,15 0,47
O 15,16 0,15 2,27
P 15,81 0,15 2,37
Q 2,15 0,15 0,32
R 2,15 0,15 0,32
S 15,81 0,15 2,37
T 2,15 0,15 0,32
U 35,12 0,15 5,27
V 12,57 0,15 1,89
W 35,12 0,15 5,27
X 2,15 0,15 0,32
Y 5,41 0,15 0,81
Z 12,81 0,15 1,92
SELASAR KELILING BANGUNAN 77,51 0,10 7,75

JUMLAH 63,32

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGAN BATU KOSONG


3
VOLUME REALISASI : 44,03 M

RUMUS :
V = LxlxH

Keterangan
V = Volume
L = Panjang
l = Lebar
H = Tinggi

DIMENSI GALIAN
VOLUME
NO URAIAN PEKERJAAN GALIAN PANJANG LEBAR TINGGI SKETSA
(M) (M) (M) (M3)
1 2 3 4 5 6 6

1 PASANGAN BATU KOSONG 220,16 1,00 0,20 44,03

JUMLAH 44,03

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGA PONDASI BATU KARANG


VOLUME REALISASI : 266,32 M3

RUMUS :
V = AxL
A = 0.50 x (a + b) x H
Keterangan
V = Volume a = Lebar penampang atas urugan
A = Luas Penampang b = Lebar penampang Bawah urugan
L = Panjang
H = Tinggi

DIMENSI PASANGAN PANJANG LUAS


VOLUME
NO URAIAN PEKERJAAN PASANGAN PONDASI LEBAR ATAS LEBAR BAWAH TINGGGI PASANGAN PENAMPANG SKETSA
1 2
(M) (M) (M) (M ) (M ) (M3)
1 2 3 4 5 6 7 8

1 PASANGAN PONDSI MENERUS 0,30 0,80 0,70 335,99 0,39 258,71

2 PASANGAN PONDASI ROLAK 0,30 0,30 0,50 7,50 0,15 2,25

3 PASANGAN TERAS 0,30 0,70 0,70 7,66 0,35 5,36

JUMLAH 351,15 266,32

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGA DINDING BATAKO (1Pc : 5 Prs)


VOLUME REALISASI : 60,88

RUMUS :
V = A xT
A bersih = A pasangan - A lubang kusen
A pasangan = LxH

Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi bersi
T = Tebal bersi

PANJANG TINGGI LUAS LUAS LUAS LUAS LUAS TEBAL VOLUME


PASANGAN PASANGAN PASANGAN LUBANG LUBANG LUBANG BERSIH PASANGAN PASANGAN
NO KODE PENEMPATAN PASANG TEMBOK SKETSA
TEMBOK TEMBOK TEMBOK KUSEN KUSEN KUSEN PASANGAN TEMBOK TEMBOK
(M) (M) (M2) (M2) (M2) (M2) (M2) (M) (M3)
1 2 4 5 8

1 A 3,55 3,40 12,07 - 1,66 1,66 10,41 0,12 1,25


2 B 4,58 3,40 15,56 - 1,66 1,66 13,90 0,12 1,67
3 C 1,50 1,95 2,93 - 0,45 0,45 2,47 0,12 0,30
4 D 1,63 3,40 5,53 - 1,24 1,24 4,28 0,12 0,51
5 E 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
6 F 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
7 G 1,50 3,40 5,10 - 0,45 0,45 4,65 0,12 0,56
8 H 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
9 I 4,83 3,40 16,41 - 6,35 6,35 10,05 0,12 1,21
10 J 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
11 K 4,83 3,40 16,41 - 6,35 6,35 10,05 0,12 1,21
12 L 5,80 3,40 19,72 - - - 19,72 0,12 2,37
13 M 1,65 1,95 3,22 - - - 3,22 0,12 0,39
14 N 1,33 1,95 2,58 1,56 2,12 0,56 2,02 0,12 0,24
15 O 1,65 1,95 3,22 - - - 3,22 0,12 0,39
16 P 4,05 3,40 13,77 - - - 13,77 0,12 1,65
17 Q 6,28 3,40 21,34 0,88 7,60 6,72 14,61 0,12 1,75
18 R 1,65 1,95 3,22 - - - 3,22 0,12 0,39
19 S 1,65 1,95 3,22 - - - 3,22 0,12 0,39
20 T 1,33 1,95 2,58 1,56 2,12 0,56 2,02 0,12 0,24
21 U 4,05 3,40 13,77 - - - 13,77 0,12 1,65
22 V 6,30 3,40 21,42 0,88 9,95 9,07 12,35 0,12 1,48
23 W 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32
24 X 1,33 1,95 2,58 - - - 2,58 0,12 0,31
25 Y 4,05 3,40 13,77 - - - 13,77 0,12 1,65
26 Z 1,65 1,95 3,22 - - - 3,22 0,12 0,39
27 1 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32
28 2 1,33 1,95 2,58 - - - 2,58 0,12 0,31
29 3 1,33 3,40 4,51 - - - 4,51 0,12 0,54
30 4 2,10 1,95 4,10 - - - 4,10 0,12 0,49
31 5 2,10 3,40 7,14 - - - 7,14 0,12 0,86
32 6 3,15 3,40 10,71 0,48 4 3,86 6,85 0,12 0,82
33 7 2,10 1,95 4,10 - - - 4,10 0,12 0,49
34 8 1,50 1,95 2,93 1,56 2,12 0,56 2,36 0,12 0,28
35 9 5,30 3,40 18,02 0,88 6,01 5,13 12,89 0,12 1,55
36 10 0,85 3,40 2,89 - - - 2,89 0,12 0,35
37 11 3,63 3,40 12,33 0,88 4,35 3,47 8,85 0,12 1,06
38 12 5,30 3,40 18,02 0,88 6,01 5,13 12,89 0,12 1,55
39 13 0,85 3,40 2,89 - - - 2,89 0,12 0,35
40 14 3,55 3,40 12,07 - 1,66 1,66 10,41 0,12 1,25
41 15 4,58 3,40 15,56 - 1,66 1,66 13,90 0,12 1,67
RUMUS :
V = A xT
A bersih = A pasangan - A lubang kusen
A pasangan = LxH

Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi bersi
T = Tebal bersi

PANJANG TINGGI LUAS LUAS LUAS LUAS LUAS TEBAL VOLUME


PASANGAN PASANGAN PASANGAN LUBANG LUBANG LUBANG BERSIH PASANGAN PASANGAN
NO KODE PENEMPATAN PASANG TEMBOK SKETSA
TEMBOK TEMBOK TEMBOK KUSEN KUSEN KUSEN PASANGAN TEMBOK TEMBOK
2 2 2 2 2 3
(M) (M) (M ) (M ) (M ) (M ) (M ) (M) (M )
1 2 4 5 8
42 16 1,50 1,95 2,93 - 0,45 0,45 2,47 0,12 0,30
43 17 2,10 1,95 4,10 - - - 4,10 0,12 0,49
44 18 1,50 1,95 2,93 1,56 2,12 0,56 2,36 0,12 0,28
45 19 2,10 3,40 7,14 - - - 7,14 0,12 0,86
46 20 2,10 1,95 4,10 - - - 4,10 0,12 0,49
47 21 1,33 3,40 4,51 - - - 4,51 0,12 0,54
48 22 6,30 3,40 21,42 - 3,32 3,32 18,10 0,12 2,17
49 23 6,38 3,40 21,68 0,48 6,35 5,86 15,81 0,12 1,90
50 24 6,38 3,40 21,68 0,48 4,34 3,86 17,82 0,12 2,14
51 25 3,15 3,40 10,71 0,48 3,52 3,03 7,68 0,12 0,92
52 26 3,15 3,40 10,71 0,48 3,52 3,03 7,68 0,12 0,92
53 27 6,28 3,40 21,34 0,88 7,60 6,72 14,61 0,12 1,75
54 28 5,80 3,40 19,72 - - - 19,72 0,12 2,37
55 29 4,83 3,40 16,41 - 6,35 6,35 10,05 0,12 1,21
56 30 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
57 31 1,50 3,40 5,10 - 0,45 0,45 4,65 0,12 0,56
58 32 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
59 33 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
60 34 1,50 3,40 5,10 - 0,45 0,45 4,65 0,12 0,56
61 35 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32
62 36 1,65 1,95 3,22 - - - 3,22 0,12 0,39
63 37 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32
64 38 1,65 1,95 3,22 - - - 3,22 0,12 0,39
65 39 1,65 1,95 3,22 - - - 3,22 0,12 0,39
66 40 1,33 1,95 2,58 1,56 2,12 0,56 2,02 0,12 0,24
67 41 1,33 1,95 2,58 - - - 2,58 0,12 0,31
68 42 1,33 1,95 2,58 - - - 2,58 0,12 0,31
69 43 6,30 3,40 21,42 - - - 21,42 0,12 2,57
70 44 4,05 3,40 13,77 - - - 13,77 0,12 1,65
71 45 4,05 3,40 13,77 - - - 13,77 0,12 1,65
72 46 2,35 3,40 7,99 0,88 4,35 3,47 4,52 0,12 0,54
73 47 (KUDA-KUDA PAS. BATU) 3,17 - 3,17 0,12 0,38

JUMLAH 507,35 60,88

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGA DINDING TRASRAM (1Pc : 2 Prs)


VOLUME REALISASI : 18,25

RUMUS :
V = A xT
A bersih = A pasangan - A lubang kusen
A pasangan = LxH

Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi bersi
T = Tebal bersi

PANJANG TINGGI LUAS LUAS LUAS TEBAL VOLUME


PASANGAN PASANGAN PASANGAN LUBANG BERSIH PASANGAN PASANGAN
NO KODE PENEMPATAN PASANG TEMBOK SKETSA
TEMBOK TEMBOK TEMBOK KUSEN PASANGAN TEMBOK TEMBOK
(M) (M) (M2) (M2) (M2) (M) (M3)
1 2 4 5 8

1 A 3,55 0,55 1,95 - 1,95 0,11 0,21


2 B 4,58 0,55 2,52 - 2,52 0,11 0,28
3 C 1,50 2,00 3,00 - 3,00 0,11 0,33
4 D 1,63 0,55 0,89 - 0,89 0,11 0,10
5 E 1,33 2,00 2,65 - 2,65 0,11 0,29
6 F 1,33 2,00 2,65 - 2,65 0,11 0,29
7 G 1,50 0,55 0,83 - 0,83 0,11 0,09
8 H 1,33 2,00 2,65 - 2,65 0,11 0,29
9 I 4,83 0,55 2,65 - 2,65 0,11 0,29
10 J 1,33 2,00 2,65 - 2,65 0,11 0,29
11 K 4,83 0,55 2,65 - 2,65 0,11 0,29
12 L 5,80 0,55 3,19 - 3,19 0,11 0,35
13 M 1,65 2,00 3,30 - 3,30 0,11 0,36
14 N 1,33 2,00 2,65 1,56 1,09 0,11 0,12
15 O 1,65 2,00 3,30 - 3,30 0,11 0,36
16 P 4,05 0,55 2,23 - 2,23 0,11 0,25
17 Q 6,28 0,55 3,45 0,88 2,57 0,11 0,28
18 R 1,65 2,00 3,30 - 3,30 0,11 0,36
19 S 1,65 2,00 3,30 - 3,30 0,11 0,36
20 T 1,33 2,00 2,65 1,56 1,09 0,11 0,12
21 U 4,05 0,55 2,23 - 2,23 0,11 0,25
22 V 6,30 0,55 3,47 0,88 2,59 0,11 0,28
23 W 1,65 2,00 3,30 1,56 1,74 0,11 0,19
24 X 1,33 2,00 2,65 - 2,65 0,11 0,29
25 Y 4,05 0,55 2,23 - 2,23 0,11 0,25
26 Z 1,65 2,00 3,30 - 3,30 0,11 0,36
27 1 1,65 2,00 3,30 1,56 1,74 0,11 0,19
28 2 1,33 2,00 2,65 - 2,65 0,11 0,29
29 3 1,33 0,55 0,73 - 0,73 0,11 0,08
30 4 2,10 2,00 4,20 - 4,20 0,11 0,46
31 5 2,10 0,55 1,16 - 1,16 0,11 0,13
32 6 3,15 0,55 1,73 0,48 1,25 0,11 0,14
33 7 2,10 2,00 4,20 - 4,20 0,11 0,46
34 8 1,50 2,00 3,00 1,56 1,44 0,11 0,16
35 9 5,30 0,55 2,92 0,88 2,04 0,11 0,22
36 10 0,85 0,55 0,47 - 0,47 0,11 0,05
37 11 3,63 0,55 1,99 0,88 1,11 0,11 0,12
38 12 5,30 0,55 2,92 0,88 2,04 0,11 0,22
39 13 0,85 0,55 0,47 - 0,47 0,11 0,05
40 14 3,55 0,55 1,95 - 1,95 0,11 0,21
41 15 4,58 0,55 2,52 - 2,52 0,11 0,28
42 16 1,50 2,00 3,00 - 3,00 0,11 0,33
RUMUS :
V = A xT
A bersih = A pasangan - A lubang kusen
A pasangan = LxH

Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi bersi
T = Tebal bersi

PANJANG TINGGI LUAS LUAS LUAS TEBAL VOLUME


PASANGAN PASANGAN PASANGAN LUBANG BERSIH PASANGAN PASANGAN
NO KODE PENEMPATAN PASANG TEMBOK SKETSA
TEMBOK TEMBOK TEMBOK KUSEN PASANGAN TEMBOK TEMBOK
(M) (M) (M2) (M2) (M2) (M) (M3)
1 2 4 5 8
43 17 2,10 2,00 4,20 - 4,20 0,11 0,46
44 18 1,50 2,00 3,00 1,56 1,44 0,11 0,16
45 19 2,10 0,55 1,16 - 1,16 0,11 0,13
46 20 2,10 2,00 4,20 - 4,20 0,11 0,46
47 21 1,33 2,00 2,65 - 2,65 0,11 0,29
48 22 6,30 0,55 3,47 - 3,47 0,11 0,38
49 23 6,38 0,55 3,51 0,48 3,02 0,11 0,33
50 24 6,38 0,55 3,51 0,48 3,02 0,11 0,33
51 25 3,15 0,55 1,73 0,48 1,25 0,11 0,14
52 26 3,15 0,55 1,73 0,48 1,25 0,11 0,14
53 27 6,28 0,55 3,45 0,88 2,57 0,11 0,28
54 28 5,80 0,55 3,19 - 3,19 0,11 0,35
55 29 4,83 0,55 2,65 - 2,65 0,11 0,29
56 30 1,33 2,00 2,65 - 2,65 0,11 0,29
57 31 1,50 0,55 0,83 - 0,83 0,11 0,09
58 32 1,33 2,00 2,65 - 2,65 0,11 0,29
59 33 1,33 2,00 2,65 - 2,65 0,11 0,29
60 34 1,50 0,55 0,83 - 0,83 0,11 0,09
61 35 1,65 2,00 3,30 1,56 1,74 0,11 0,19
62 36 1,65 2,00 3,30 - 3,30 0,11 0,36
63 37 1,65 2,00 3,30 1,56 1,74 0,11 0,19
64 38 1,65 2,00 3,30 - 3,30 0,11 0,36
65 39 1,65 2,00 3,30 - 3,30 0,11 0,36
66 40 1,33 2,00 2,65 1,56 1,09 0,11 0,12
67 41 1,33 2,00 2,65 - 2,65 0,11 0,29
68 42 1,33 2,00 2,65 - 2,65 0,11 0,29
69 43 6,30 0,55 3,47 - 3,47 0,11 0,38
70 44 4,05 0,55 2,23 - 2,23 0,11 0,25
71 45 4,05 0,55 2,23 - 2,23 0,11 0,25
72 46 2,35 0,55 1,29 0,88 0,41 0,11 0,05

JUMLAH 18,25

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
(Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : SALURAN KELILING BANGUNAN (1Pc : 2 Prs)


VOLUME REALISASI : 12,92 M3

RUMUS SKETSA

V = A xL
A = A1 + A2 + A3
A1 = H1 x TI
A2 = H2 x T2
A3 = H3 x T3

Keterangan
V = Volume
L = Panjang saluran
A = Jumlah luas penampang
A1 = Luas penampang 1
A2 = Luas penampang 2
A3 = Luas penampang 3
H1 = Tinggi penampang 1
H2 = Tinggi penampang 2
H3 = Tinggi penampang 3
T1 = Tebal penampang 1
T2 = Tebal penampang 2
T3 = Tebal penampang 3

PANJANG DIMENSI PENAMPANG 1 DIMENSI PENAMPANG 2 DIMENSI PENAMPANG 3 LUAS LUAS LUAS LUAS VOLUME
SALURAN TINGGI TEBAL TINGGI TEBAL TINGGI TEBAL PENAMPANG PENAMPANG PENAMPANG PENAMPANG PASANGAN
URAIAN PEKERJAAN
KESELURUAN PENAMPANG PENAMPANG PENAMPANG PENAMPANG PENAMPANG PENAMPANG 1 2 3 TOTAL SALURAN
(M) (M) (M) (M) (M) (M) (M) (M2) (M2) (M2) (M2) (M3)
2 4 5

SALURAN KELILING BANGUNAN (1Pc : 2 Prs) 86,10 0,45 0,10 0,10 0,30 0,50 0,15 0,05 0,03 0,08 0,15 12,92

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PLESTERAN DINDING TRASRAM (1Pc : 2 Prs)


2
VOLUME REALISASI : 40,98 M

RUMUS :
V = A. plesteran - A. Lubang Kusen
A plesteran = LxH

Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi

PANJANG TINGGI LUAS LUAS VOLUME


PLESTERAN PLESTERAN PLESTERAN LUBANG PLESTERAN
NO KODE PENEMPATAN PLESTERAN TEMBOK SKETSA
TEMBOK TEMBOK TEMBOK KUSEN TEMBOK
(M) (M) (M2) (M2) (M2)
1 2 4 5 8

1 A 3,75 0,55 2,06 - 2,06


2 B 6,60 0,55 3,63 - 3,63
3 C 1,50 0,55 0,83 - 0,83
4 D 1,80 0,55 0,99 - 0,99
5 E 1,50 0,55 0,83 - 0,83
6 F 1,50 0,55 0,83 - 0,83
7 G 1,80 0,55 0,99 - 0,99
8 H 1,50 0,55 0,83 - 0,83
9 I 5,10 0,55 2,81 - 2,81
10 J 1,50 0,55 0,83 - 0,83
11 K 5,10 0,55 2,81 - 2,81
12 L 5,80 0,55 3,19 - 3,19
13 10 1,00 0,55 0,55 - 0,55
14 11 4,00 0,55 2,20 0,88 1,32
15 13 1,00 0,55 0,55 - 0,55
16 14 3,55 0,55 1,95 - 1,95
17 15 6,60 0,55 3,63 - 3,63
18 16 1,50 0,55 0,83 - 0,83
19 21 1,50 0,55 0,83 - 0,83
20 28 6,00 0,55 3,30 - 3,30
21 29 5,10 0,55 2,81 - 2,81
22 30 1,50 0,55 0,83 - 0,83
23 31 1,50 0,55 0,83 - 0,83
24 32 1,50 0,55 0,83 - 0,83
25 33 1,50 0,55 0,83 - 0,83
26 34 1,50 0,55 0,83 - 0,83
26 46 2,50 0,55 1,38 0,88 0,50
JUMLAH 40,98

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGA DINDING BIASA (1Pc : 5 Prs)


2
VOLUME REALISASI : 913,95 M

RUMUS :
V = A. plesteran - A. Lubang Kusen
A plesteran = LxH

Keterangan :
V = Volume
A = Luas
L = Panjang
H = Tinggi

PANJANG TINGGI LUAS LUAS VOLUME


PLESTERAN PLESTERAN PLESTERAN LUBANG PLESTERAN
NO KODE PENEMPATAN PLESTERAN TEMBOK SKETSA
TEMBOK TEMBOK TEMBOK KUSEN TEMBOK
(M) (M) (M2) (M2) (M2)
1 2 3 4 5 6 7 8

1 A 3,75 5,64 21,15 1,66 19,49


2 B 6,60 5,64 37,22 1,66 35,57
3 C 1,50 5,64 8,46 0,45 8,01
4 D 1,80 5,64 10,15 2,01 8,15
5 E 1,50 5,64 8,46 0,45 8,01
6 F 1,50 5,64 8,46 0,45 8,01
7 G 1,80 5,64 10,15 2,01 8,15
8 H 1,50 5,64 8,46 0,45 8,01
9 I 5,10 5,64 28,76 6,35 22,41
10 J 1,50 5,64 8,46 0,45 8,01
11 K 5,10 5,64 28,76 6,35 22,41
12 L 5,80 5,64 32,71 - 32,71
13 M 1,80 4,35 7,83 - 7,83
14 N 1,50 4,35 6,53 2,12 4,40
15 O 1,80 4,35 7,83 - 7,83
16 P 4,20 4,38 18,40 - 18,40
17 Q 6,60 4,38 28,91 7,60 21,30
18 R 1,80 4,35 7,83 - 7,83
19 S 1,80 4,35 7,83 - 7,83
20 T 1,50 4,35 6,53 2,12 4,40
21 U 4,20 4,38 18,40 - 18,40
22 V 6,60 4,38 28,91 9,95 18,96
23 W 1,80 4,35 7,83 2,12 5,71
24 X 1,50 4,35 6,53 - 6,53
25 Y 4,20 4,38 18,40 - 18,40
26 Z 1,80 4,32 7,78 - 7,78
27 1 1,80 4,35 7,83 2,12 5,71
28 2 1,50 4,35 6,53 - 6,53
29 3 1,50 4,38 6,57 - 6,57
30 4 2,25 4,35 9,79 - 9,79
31 5 2,25 4,38 9,86 - 9,86
32 6 3,30 4,38 14,45 4 10,11
33 7 2,25 4,35 9,79 - 9,79
34 8 1,65 4,35 7,18 2,12 5,06
35 9 5,60 4,38 24,53 6,01 18,52
36 10 1,00 5,64 5,64 - 5,64
37 11 4,00 5,64 22,56 3,47 19,09
38 12 5,60 4,38 24,53 6,01 18,52
39 13 1,00 4,38 4,38 - 4,38
RUMUS :
V = A. plesteran - A. Lubang Kusen
A plesteran = LxH

Keterangan :
V = Volume
A = Luas
L = Panjang
H = Tinggi

PANJANG TINGGI LUAS LUAS VOLUME


PLESTERAN PLESTERAN PLESTERAN LUBANG PLESTERAN
NO KODE PENEMPATAN PLESTERAN TEMBOK SKETSA
TEMBOK TEMBOK TEMBOK KUSEN TEMBOK
(M) (M) (M2) (M2) (M2)
1 2 3 4 5 6 7 8
40 14 3,55 5,64 20,02 1,66 18,36
41 15 6,60 4,38 28,91 1,66 27,25
42 16 1,50 4,38 6,57 0,45 6,12
43 17 2,25 4,35 9,79 - 9,79
44 18 1,65 4,35 7,18 2,12 5,06
45 19 2,25 4,38 9,86 - 9,86
46 20 2,25 4,35 9,79 - 9,79
47 21 1,50 5,64 8,46 - 8,46
48 22 6,60 5,64 37,22 3,32 33,91
49 23 6,60 4,38 28,91 6,35 22,56
50 24 6,60 4,38 28,91 4,34 24,57
51 25 3,30 4,38 14,45 3,52 10,94
52 26 3,30 4,38 14,45 3,52 10,94
53 27 6,60 4,38 28,91 7,60 21,30
54 28 6,00 5,64 33,84 - 33,84
55 29 5,10 5,64 28,76 6,35 22,41
56 30 1,50 5,64 8,46 0,45 8,01
57 31 1,50 5,64 8,46 0,45 8,01
58 32 1,50 5,64 8,46 0,45 8,01
59 33 1,50 5,64 8,46 0,45 8,01
60 34 1,50 5,64 8,46 0,45 8,01
61 35 1,80 4,35 7,83 2,12 5,71
62 36 1,80 4,32 7,78 - 7,78
63 37 1,80 4,35 7,83 2,12 5,71
64 38 1,80 4,35 7,83 - 7,83
65 39 1,80 4,35 7,83 - 7,83
66 40 1,50 4,35 6,53 2,12 4,40
67 41 1,33 4,35 5,76 - 5,76
68 42 1,50 4,35 6,53 - 6,53
69 43 6,60 4,38 28,91 - 28,91
70 44 4,20 4,38 18,40 - 18,40
71 45 4,20 4,38 18,40 - 18,40
72 46 2,50 4,38 10,95 3,47 7,48
JUMLAH 913,95

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PLESTERAN PONDASI ( 1PC : 5PSR)


2
VOLUME REALISASI : 28,79 M

SKETSA

PANJANG PANJANG PANJANG JUMLAH LUAS


PONDASI BIDANG BIDANG PANJANG PENAMPANG
RUMUS KETERANGAN
KESELURUAN PLEST. 1 PLEST. 2 PLESTERAN TOTAL
(M) (M) (M) (M) (M2)
1 2 3 4 5 6 7

76,76 0,30 0,08 0,38 28,79


V = H xL
H = H1 +H2

Keterangan
V = Volume
L = Panjang plesteran pondasi
H = Jumlah panjang bidang vertikal
H1 = Panjang bidang vertikal 1
H2 = Panjang bidang vertikal 2

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : ACIAN PONDASI


2
VOLUME REALISASI : 28,79 M

SKETSA

PANJANG PANJANG PANJANG JUMLAH LUAS


PONDASI BIDANG BIDANG PANJANG PENAMPANG
RUMUS KETERANGAN
KESELURUAN PLEST. 1 PLEST. 2 PLESTERAN TOTAL
(M) (M) (M) (M) (M2)
1 2 3 4 5 6 7

76,76 0,30 0,08 0,38 28,79


V = H xL
H = H1 +H2

Keterangan
V = Volume
L = Panjang acian pondasi
H = Jumlah panjang bidang vertikal
H1 = Panjang bidang vertikal 1
H2 = Panjang bidang vertikal 2

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : ACIAN DINDING


2
VOLUME REALISASI : 954,93 M

VOLUME VOLUME VOLUME


PLESTRAN PLESTRAN ACIAN
NO RUMUS SKETSA
TRASRAM BIASA DINDING
(M) (M) (M2)
1 2 4 5 8

1 V = VOLUME PLESTERAN DIDING TRASRAM + VOLUME 40,98 913,95 954,93


2 PLESTERRAN DINDING BIASA
3
4
5
6
7
8
9
10
11
12
58
59
60
61
62
63
64
65
66
67
68

69
72
JUMLAH 954,93

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : SLOOF 20/25


3
VOLUME REALISASI : 17,56 M

SKETSA

PANJANG DIMENSI SLOOF VOLUME


SLOOF TINGGI LEBAR BETON
RUMUS POTONGAN PENAMPANG
SLOOF SLOOF SLOOF
3
(M) (M) (M) (M )
2 4 5 6 7 8

V = LxHxL 351,15 0,25 0,20 17,56

Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
L = Lebar Penampang

JUMLAH 17,56

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : KOLOM PRAKTIS 15/15


3
VOLUME REALISASI : 4,86 M

SKETSA

JUMLAH PANJANG DIMENSI KOLOM VOLUME


KOLOM KOLOM TINGGI LEBAR BETON
RUMUS POTONGAN PENAMPANG
PRAKTIS PRAKTIS KOLOM KOLOM KOLOM
3
(BUAH) (M) (M) (M) (M )
2 4 5 6 7 8 9

V = Jumlah kolom x L x H x L 52 4,15 0,15 0,15 4,86

Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
l = Lebar Penampang

JUMLAH 4,86

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : KOLOM STRUKTUR 20/25


3
VOLUME REALISASI : 4,57 M

SKETSA

JUMLAH PANJANG DIMENSI KOLOM VOLUME


KOLOM KOLOM TINGGI LEBAR BETON
RUMUS POTONGAN PENAMPANG
STRUKTUR STRUKTUR KOLOM KOLOM KOLOM
3
(BUAH) (M) (M) (M) (M )
2 4 5 6 7 8 9

V = Jumlah kolom x L x H x L 22 4,15 0,25 0,20 4,57

Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
l = Lebar Penampang

JUMLAH 4,57

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : KOLOM BULAT DIA. 25 CM


3
VOLUME REALISASI : 0,41 M

SKETSA

JUMLAH PANJANG DIAMETER LUAS VOLUME


KOLOM KOLOM KOLOM PENAMPANG BETON
RUMUS POTONGAN PENAMPANG
BULAT BULAT BULAT KOLOM KOLOM
(BUAH) (M) (M) (M2) (M3)
2 4 5 6 8 9

V = Jumlah kolom x L x A 2,00 4,15 0,25 0,05 0,41


A = 1/4 x 22/7 x D2

Keterangan
V = Volume
A = Luas
L = Panjang
D = Diameter

JUMLAH 0,41

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : RINGBALOK 15/20


3
VOLUME REALISASI : 10,53 M

SKETSA

PANJANG DIMENSI SLOOF VOLUME


RINGBALOK TINGGI LEBAR BETON
RUMUS SKETSA PENAMPANG
RINGBALOK RINGBALOK RINGBALOK
3
(M) (M) (M) (M )
2 4 5 6 7 8

V = LxHxL 351,15 0,20 0,15 10,53

Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
L = Lebar Penampang

JUMLAH 10,53

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : BALOK LATAI 10/15


3
VOLUME REALISASI : 5,27 M

SKETSA

PANJANG DIMENSI SLOOF VOLUME


BALOK TINGGI LEBAR BETON
RUMUS SKETSA PENAMPANG
LATAI BALOK BALOK BALOK
3
(M) (M) (M) (M )
2 4 5 6 7 8

V = LxHxL 351,15 0,10 0,15 5,27

Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
L = Lebar Penampang

JUMLAH 5,27

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LANTAI RABAT BETON CAMPURAN 1Pc : 3Psr : 5Krl
3
VOLUME REALISASI : 7,29 M

RUMUS :
V A xT
A Lxl

Keterangan
V = Volume L Panjang
A = Luasan l Lebar
T = Tebal

PANJANG LEBAR LUAS TEBAL VOLUME


KODE POSISI PENEMPATAN RABAT BETON RABAT RABAT RABAT RABAT RABAT SKETSA
(M) (M) (M2) (M) (M3)
2 3 4 5 6 7 8

A 4,73 0,98 4,61 0,10 0,46

B 5,63 0,98 5,48 0,10 0,55

C 2,48 0,98 2,41 0,10 0,24

D 19,95 0,98 19,45 0,10 1,95

E 6,98 0,98 6,80 0,10 0,68

F 6,98 0,98 6,80 0,10 0,68

G 19,95 0,98 19,45 0,10 1,95

H 2,48 0,98 2,41 0,10 0,24

I 5,63 0,98 5,48 0,10 0,55

J 4,73 0,98 4,61 0,10 0,46

JUMLAH 7,29

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LANTAI TEGEL KERAMIK UKURAN 20 x 20


2
VOLUME REALISASI : 21,37 M

VOLUME
NO NAMA RUANGAN KERAMIK SKETSA
(M2)
1 2 3 6

1 KM/WC RUANG BERSALIN 1 3,15

2 KM/WC RUANG BERSALIN 2 3,15

3 KM/WC RUANG DOKTER 2,15

4 KM/WC RUANG ADMINISTRASI 2,15

5 KM/WC RUANG RAWAT INAP 1 2,15

6 KM/WC RUANG RAWAT INAP 2 2,15

7 KM/WC RUANG RAWAT INAP 3 2,15

8 KM/WC RUANG ISOLASI 1 2,15

9 KM/WC RUANG ISOLASI 2 2,15

JUMLAH 21,37

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LANTAI TEGEL KERAMIK KM/WC UKURAN 30 x 30


2
VOLUME REALISASI : 327,82 M

VOLUME
NO NAMA RUANGAN KERAMIK SKETSA
(M2)
1 2 3 6

1 TERAS 13,12

2 RUANG BERSALIN 1 23,60

3 RUANG BERSALIN 1 23,60

4 CORIDOR 56,75

5 RUANG DOKTER 15,81

6 RUANG ADMINISTRASI 15,81

7 RUANG RAWAT INAP 1 35,12

8 RUANG RAWAT INAP 2 35,12

9 TERAS 5,41

10 RUANG RAWAT INAP 2 35,12

11 RUANG ISOLASI 1 15,81

12 RUANG ISOLASI 2 15,81

13 RUANG NEONATUS 23,22

14 NURSE STATION 13,55

JUMLAH 327,82

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : DINDING KERAMIK 20/25 CM


2
VOLUME REALISASI : 505,66 M

RUMUS :

V = A pas. Keramik - A lubang kusen


A pas.keramik = LxH

Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi

PANJANG TINGGI LUAS LUAS VOLUME


NO PASANGAN PASANGAN PASANGAN LUBANG PASANGAN
NAMA RUANGAN SKETSA
KERAMIK KERAMIK KERAMIK KUSEN KERAMIK
(M) (M) (M2) (M2) (M2)
1 2 3 4 5 6 7 8

1 RUANG BERSALIN 1 21,60 1,81 39,10 4,31 34,79


2 KM/WC RUANG BERSALIN 1 7,20 1,84 13,25 1,44 11,81
3 RUANG DOKTER 18,00 1,81 32,58 4,59 27,99
4 KM/WC RUANG DOKTER 5,89 1,84 10,84 1,44 9,40
5 RUANG ADMINISTRASI 15,15 1,81 27,42 2,22 25,20
6 KM/WC RUANG ADMINISTRASI 5,89 1,84 10,84 1,44 9,40
7 RUANG RAWAT INAP 1 24,60 1,81 44,53 9,05 35,47
8 KM/WC RUANG RAWAT INAP 1 5,89 1,84 10,84 1,44 9,40
9 RUANG RAWAT INAP 2 24,60 1,81 44,53 8,11 36,41
10 KM/WC RUANG RAWAT INAP 2 5,89 1,84 10,84 1,44 9,40
11 CORIDOR 53,00 1,81 95,93 29,73 66,20
12 RUANG RAWAT INAP 3 24,60 1,84 45,26 8,19 37,08
13 KM/WC RUANG RAWAT INAP 3 5,89 1,81 10,66 1,41 9,25
14 RUANG ISOLASI 1 18,00 1,84 33,12 4,64 28,48
15 KM/WC RUANG ISOLASI 1 5,89 1,81 10,66 1,41 9,25
16 RUANG ISOLASI 2 18,00 1,84 33,12 4,64 28,48
17 KM/WC RUANG ISOLASI 2 5,89 1,81 10,66 1,41 9,25
18 RUANG NEONATUS 20,10 1,81 36,38 3,18 33,20
19 NURSE STATION 17,10 1,81 30,95 2,37 28,58
20 RUANG BERSALIN 2 21,60 1,81 39,10 4,31 34,79
21 KM/WC RUANG BERSALIN 2 7,20 1,84 13,25 1,44 11,81

JUMLAH 505,66

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : KUSEN ALUMUNIUM


1
VOLUME REALISASI : 515,80 M

RUMUS :

V= = L x JUMLAH KUSEN

Keterangan :
L = Panjang

TYPE PANJANG JUMLAH VOLUME


NO KUSEN KUSEN KUSEN KUSEN SKETSA
(M) (BUAH) (M1)
1 2 3 4 5

1 P1 10,74 2 21,48

2 P2 10,74 2 21,48

3 P3 7,70 9 69,3

4 PJ1 15,26 3 45,78

5 PJ2 16,16 2 32,32

6 PJ3 16,16 2 32,32

7 PJ4 12,18 1 12,18

8 PJ5 12,18 1 12,18

9 J1 17,52 4 70,08

10 J2 9,84 10 98,4

11 BV1 8,04 8 64,32

12 BV2 4,38 2 8,76

13 BV3 2,72 10 27,20


JUMLAH 515,80

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : DAUN JENDELA+BOVEN PANEL KACA


2
VOLUME REALISASI : 66,49 M

RUMUS :

V= = A x JUMLAH DAUN JENDELA & BOVEN x JUMLAH KUSEN


A = Lxl

Keterangan :
A = Luasan
L = Panjang
l = Lebar

TYPE DIMENSI LUAS JUMLAH JUMLAH VOLUME


NO KUSEN PANJANG LEBAR DAUN DAUN KUSEN KUSEN SKETSA
2 2
(M) (M) (M ) (BUAH) (BUAH) (M )
1 2 3 4 5

1 P1 0,75 0,50 0,38 2 2 1,50


2,10 0,76 1,60 2 2 6,38
2 P2 0,75 0,50 0,38 2 2 1,50
3 P3 0,70 0,50 0,35 1 9 3,15
4 PJ1 0,74 0,86 0,64 2 3 3,82
0,74 0,50 0,37 3 3 3,33
5 PJ2 0,60 0,86 0,52 2 1 1,03
0,60 0,50 0,30 2 1 0,60
0,80 0,50 0,40 1 1 0,40
6 PJ3 0,60 0,86 0,52 2 2 2,06
0,60 0,50 0,30 2 2 1,20
0,80 0,50 0,40 1 2 0,80
7 PJ4 0,70 0,86 0,60 1 1 0,60
0,70 0,50 0,35 1 1 0,35
0,80 0,50 0,40 1 1 0,40
8 PJ5 0,70 0,86 0,60 1 1 0,60
0,70 0,50 0,35 1 1 0,35
0,80 0,50 0,40 1 1 0,40
9 J1 0,90 0,86 0,77 2 4 6,19
0,90 0,50 0,45 2 4 3,60
10 J2 0,60 0,86 0,52 2 10 10,32
0,60 0,50 0,30 2 10 6,00
11 BV1 0,90 0,50 0,45 2 8 7,20
12 BV2 0,60 0,50 0,30 2 2 1,20
13 BV3 0,70 0,50 0,35 1 10 3,50

JUMLAH 66,49

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANG JENDELA, BOVEN KACA MATI


2
VOLUME REALISASI : 8,50 M

RUMUS :

V= = A x JUMLAH JENDELA & BOVEN KACA MATI x JUMLAH KUSEN


A = Lxl

Keterangan :
A = Luasan
L = Panjang
l = Lebar

TYPE DIMENSI LUAS JUMLAH JUMLAH VOLUME


NO KUSEN PANJANG LEBAR DAUN DAUN KUSEN KUSEN SKETSA
(M) (M) (M2) (BUAH) (BUAH) (M2)
1 2 3 4 5

9 J1 0,90 0,86 0,77 1 4 3,10


0,90 0,50 0,45 1 4 1,80

11 BV1 0,90 0,50 0,45 1 8 3,60

JUMLAH 8,50

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANG KACA PADA PINTU ALUMUNIUM


2
VOLUME REALISASI : 1,60 M

RUMUS :

V= = A x JUMLAH DAUN PINTU x JUMLAH KUSEN


A = Lxl

Keterangan :
A = Luasan
L = Panjang
l = Lebar

TYPE DIMENSI LUAS JUMLAH JUMLAH VOLUME


NO KUSEN PANJANG LEBAR DAUN DAUN KUSEN KUSEN SKETSA
(M) (M) (M2) (BUAH) (BUAH) (M2)
1 2 3 4 5

1 P2 0,76 0,15 0,11 2 2 0,46

2 PJ1 0,76 0,15 0,11 2 3 0,68

3 PJ2 0,76 0,15 0,11 1 1 0,11

4 PJ3 0,76 0,15 0,11 1 1 0,11

5 PJ4 0,76 0,15 0,11 1 1 0,11

6 PJ5 0,76 0,15 0,11 1 1 0,11

JUMLAH 1,60

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : DAUN PINTU ALUMUNIUM


2
VOLUME REALISASI : 24,36 M

RUMUS :

V= = A x JUMLAH DAUN PINTU x JUMLAH KUSEN


A = Lxl

Keterangan :
A = Luasan
L = Panjang
l = Lebar

TYPE DIMENSI LUAS JUMLAH JUMLAH VOLUME


NO KUSEN PANJANG LEBAR DAUN DAUN KUSEN KUSEN SKETSA
(M) (M) (M2) (BUAH) (BUAH) (M2)
1 2 3 4 5

1 P2 2,10 0,76 1,60 2 2 6,38

2 PJ1 2,10 1,52 3,19 1 3 9,58

3 PJ2 2,10 0,80 1,68 1 1 1,68

4 PJ3 2,10 0,80 1,68 1 2 3,36

5 PJ4 2,10 0,80 1,68 1 1 1,68

6 PJ5 2,10 0,80 1,68 1 1 1,68

JUMLAH 24,36

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : DAUN PINTU KM/WC


2
VOLUME REALISASI : 13,23 M

RUMUS :

V= = A x JUMLAH DAUN PINTU x JUMLAH KUSEN


A = Lxl

Keterangan :
A = Luasan
L = Panjang
l = Lebar

TYPE DIMENSI LUAS JUMLAH JUMLAH VOLUME


NO KUSEN PANJANG LEBAR DAUN DAUN KUSEN KUSEN SKETSA
(M) (M) (M2) (BUAH) (BUAH) (M2)
1 2 3 4 5

1 P3 2,10 0,70 1,47 1 9 13,23

JUMLAH 13,23

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : RANGKA ATAP


2
VOLUME REALISASI : 552,52 M

RUMUS :

V = 0,50 x (a + b) x H

Keterangan :
V = Volume
a = Panjang sisi atas
b = Panjang sisi bawah
H = Tinggi

KODE PANJANG SISI TINGGI VOLUME


NO PIAS ATAS BAWAH SKETSA
2
ATAP (M) (M) (M ) (M2)
1 2 3 5

1 PIAS A 5,30 22,20 9,75 134,06

2 PIAS B 5,30 22,20 9,75 134,06

3 PIAS C 16,90 0,00 9,75 82,39

4 PIAS D 12,91 10,61 1,00 11,76

5 PIAS E 12,91 10,61 1,00 11,76

6 PIAS F 10,61 10,61 4,88 51,78

7 PIAS G 10,61 10,61 4,88 51,78

8 PIAS H 10,61 4,88 2,70 20,91

9 PIAS I 6,40 4,88 2,70 15,23

10 PIAS J 5,48 2,28 5,00 19,40

11 PIAS K 5,48 2,28 5,00 19,40

JUMLAH 552,52

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : ATAP GENTENG METAL ROOF 0,30


2
VOLUME REALISASI : 552,52 M

RUMUS :

V = 0,50 x (a + b) x H

Keterangan :
V = Volume
a = Panjang sisi atas
b = Panjang sisi bawah
H = Tinggi

KODE PANJANG SISI TINGGI VOLUME


NO PIAS ATAS BAWAH SKETSA
ATAP (M) (M) (M2) (M2)
1 2 3 5

1 PIAS A 5,30 22,20 9,75 134,06

2 PIAS B 5,30 22,20 9,75 134,06

3 PIAS C 16,90 0,00 9,75 82,39

4 PIAS D 12,91 10,61 1,00 11,76

5 PIAS E 12,91 10,61 1,00 11,76

6 PIAS F 10,61 10,61 4,88 51,78

7 PIAS G 10,61 10,61 4,88 51,78

8 PIAS H 10,61 4,88 2,70 20,91

9 PIAS I 6,40 4,88 2,70 15,23

10 PIAS J 5,48 2,28 5,00 19,40

11 PIAS K 5,48 2,28 5,00 19,40

JUMLAH 552,52

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
(Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : BUBUNG METAL ROOF 0,30


1
VOLUME REALISASI : 83,66 M

KODE VOLUME
NO BUBUNGAN SKETSA
ATAP (M1)
1 2 5

1 BUBUNGAN A 12,98

2 BUBUNGAN B 12,98

3 BUBUNGAN C 5,30

4 BUBUNGAN D 12,98

5 BUBUNGAN E 12,98

6 BUBUNGAN F 10,35

7 BUBUNGAN G 5,31

8 BUBUNGAN H 5,31

9 BUBUNGAN I 5,48

JUMLAH 83,66

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
(Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LISTPLANK PAPAN KELAS 2 UKURAN 2 X 2,50/30


1
VOLUME REALISASI : 108,72 M

KODE VOLUME
NO LISTPLANK SKETSA
ATAP (M1)
1 2 5

1 LISTPLANK A 16,90
2 LISTPLANK B 22,20
3 LISTPLANK C 1,50
4 LISTPLANK D 6,60
5 LISTPLANK E 3,75
6 LISTPLANK F 1,83
7 LISTPLANK G 9,24
8 LISTPLANK H 1,83
9 LISTPLANK I 3,75
10 LISTPLANK J 6,60
11 LISTPLANK K 1,50
12 LISTPLANK L 22,20
13 LISTPLANK M 10,82
14
15

JUMLAH 108,72

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PLAFOND TRIPLEKS 3 MM DAN RANGKA


2
VOLUME REALISASI : 469,05 M

VOLUME
NO NAMA RUANGAN PLAFOND SKETSA
(M2)
1 2 3 6

1 RUANG BERSALIN 1 23,60


2 KM/WC RUANG BERSALIN 1 3,15
3 RUANG DOKTER 15,81
4 KM/WC RUANG DOKTER 2,15
5 RUANG ADMINISTRASI 15,81
6 KM/WC RUANG ADMINISTRASI 2,15
7 RUANG RAWAT INAP 1 35,12
8 KM/WC RUANG RAWAT INAP 1 2,15
9 RUANG RAWAT INAP 2 35,12
10 KM/WC RUANG RAWAT INAP 2 2,15
11 CORIDOR 56,75
12 RUANG RAWAT INAP 3 35,12
13 KM/WC RUANG RAWAT INAP 3 2,15
14 RUANG ISOLASI 1 15,81
15 KM/WC RUANG ISOLASI 1 2,15
16 RUANG ISOLASI 2 15,81
17 KM/WC RUANG ISOLASI 2 2,15
18 RUANG NEONATUS 23,22
19 NURSE STATION 13,55
20 RUANG BERSALIN 2 23,60
21 KM/WC RUANG BERSALIN 2 3,15
22 TERAS DEPAN 12,51
23 TERAS BELAKANG 5,40
24 SELASAR KELILING GEDUNG 120,48

JUMLAH 469,05

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LIST KAYU PROFIL


2
VOLUME REALISASI : 434,44 M

PANJANG
NO LIST
NAMA RUANGAN SKETSA
PLAFOND
(M)
1 2 3 4

1 RUANG BERSALIN 1 21,60


2 KM/WC RUANG BERSALIN 1 7,20
3 RUANG DOKTER 18,00
4 KM/WC RUANG DOKTER 5,89
5 RUANG ADMINISTRASI 15,15
6 KM/WC RUANG ADMINISTRASI 5,89
7 RUANG RAWAT INAP 1 24,60
8 KM/WC RUANG RAWAT INAP 1 5,89
9 RUANG RAWAT INAP 2 24,60
10 KM/WC RUANG RAWAT INAP 2 5,89
11 CORIDOR 49,70
12 RUANG RAWAT INAP 3 24,60
13 KM/WC RUANG RAWAT INAP 3 5,89
14 RUANG ISOLASI 1 18,00
15 KM/WC RUANG ISOLASI 1 5,89
16 RUANG ISOLASI 2 18,00
17 KM/WC RUANG ISOLASI 2 5,89
18 RUANG NEONATUS 20,10
19 NURSE STATION 17,10
20 RUANG BERSALIN 2 21,60
21 KM/WC RUANG BERSALIN 2 7,20
22 TERAS MUKA 14,00
23 TERAS BELAKANG 5,40
24 SELASAR KELILING 86,36

JUMLAH 434,44

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LISTPLANK PAPAN KELAS 2 UKURAN 2 X 2,50/30


2
VOLUME REALISASI : 57,62 M

KODE PANJANG LEBAR VOLUME


NO LISTPLANK BIDANG CAT BIDANG CAT SKETSA
ATAP (M) (M) (M2)
1 2 5

1 LISTPLANK A 16,90 0,53 8,96


2 LISTPLANK B 22,20 0,53 11,77
3 LISTPLANK C 1,50 0,53 0,80
4 LISTPLANK D 6,60 0,53 3,50
5 LISTPLANK E 3,75 0,53 1,99
6 LISTPLANK F 1,83 0,53 0,97
7 LISTPLANK G 9,24 0,53 4,90
8 LISTPLANK H 1,83 0,53 0,97
9 LISTPLANK I 3,75 0,53 1,99
10 LISTPLANK J 6,60 0,53 3,50
11 LISTPLANK K 1,50 0,53 0,80
12 LISTPLANK L 22,20 0,53 11,77
LISTPLANK M 10,82 0,53 5,73

JUMLAH 57,62

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : CAT DINDING


2
VOLUME REALISASI : 954,93 M

VOLUME VOLUME VOLUME


CAT DINDING CAT DINDING CAT
RUMUS SKETSA
TRASRAM BIASA DINDING
(M) (M) (M2)
1 2 3 4 5

V = VOLUME CAT DIDING TRASRAM + VOLUME CAT DINDING 40,98 913,95 954,93
BIASA

JUMLAH 954,93

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)


NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : CAT PLAFOND DAN LIST PLAFOND


2
VOLUME REALISASI : 490,77 M

VOLUME
NO NAMA RUANGAN PLAFOND SKETSA
(M2)
1 2 3 6

1 RUANG BERSALIN 1 23,60


2 KM/WC RUANG BERSALIN 1 3,15
3 RUANG DOKTER 15,81
4 KM/WC RUANG DOKTER 2,15
5 RUANG ADMINISTRASI 15,81
6 KM/WC RUANG ADMINISTRASI 2,15
7 RUANG RAWAT INAP 1 35,12
8 KM/WC RUANG RAWAT INAP 1 2,15
9 RUANG RAWAT INAP 2 35,12
10 KM/WC RUANG RAWAT INAP 2 2,15
11 CORIDOR 56,75
12 RUANG RAWAT INAP 3 35,12
13 KM/WC RUANG RAWAT INAP 3 2,15
14 RUANG ISOLASI 1 15,81
15 KM/WC RUANG ISOLASI 1 2,15
16 RUANG ISOLASI 2 15,81
17 KM/WC RUANG ISOLASI 2 2,15
18 RUANG NEONATUS 23,22
19 NURSE STATION 13,55
20 RUANG BERSALIN 2 23,60
21 KM/WC RUANG BERSALIN 2 3,15
22 TERAS DEPAN 12,51
23 TERAS BELAKANG 5,40
24 SELASAR KELILING GEDUNG 120,48
25 LIST PLAFOND 21,72

JUMLAH 490,77

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,


RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN


Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001