Anda di halaman 1dari 8

PERMINTAAN SANITASI/TRIWULAN

NO NAMA BAHAN DAN ALAT KERJA SAT VOL HARGA SAT JML HARGA
(Rp) (Rp)

I. BAHAN HABIS PAKAI


1. Densol Dos 21
2.Vixal Dos 21
3.Bayclin : Dos 21
a. OK :2 Dos
b. Kebidanan
c. Lab
d.Utd
ePolik Kandungan
f. Icu
e. Igd
g.Sisanya Sumua Ruangan
4. Rinso (Semua Ruangan) Dos 7
5. Clean (Semua Ruangan) Dos 7
II.

ALAT KERJA
6. Sapu Lantai buah 183
7. Pel Lantai buah 183
8. Sapu Taman ( Sapu Lidi Gagang) buah 132
9. Sapu Lawa-lawa buah 66
10. Ember Pel buah 84
11. Kawat ikat 15
12. Kantong Hitam (2000) pak 135 40,000 5,400,000
13. Kantong Hitam (1000) pak 75 18,000 1,350,000
14. Kantong Hitam Besar(Polyback sampah ) pak 200 50,000 10,000,000
15 Kantong Kuning (2000) pak 135 40,000 5,400,000
16. Kantong Kuning (1000) pak 75 18,000 1,350,000
17. Kanver bks 75
18.Keset buah 150
19.Sikat Closet buah 75
20. Sikat Kamar Mandi Pake kawat buah 75

Mesin Pompa Ipal buah 4


PERMINTAAN ALAT DAN BAHAN KERJA BANGUNAN

NO NAMA BAHAN DAN ALAT KERJA SAT VOL HARGA SAT JML HARGA
(Rp) (Rp)

I. BAHAN HABIS PAKAI


a. Semen Sak 20 80,000 1,600,000
b.Pasir Ret 1 600,000 600,000
c.Pipa Staf
d.

II. ALAT KERJA


a. Teropol buah 2 50,000 100,000
b. Palu buah 1 75,000 75,000
c.Oben Listrik Buah 1 350,000 350,000
d. Skaf Strom buah 1 2,700,000 2,700,000
PERMINTAAN ALAT DAN BAHAN PEMELIHARAAN LIMBAH januari

NO NAMA BAHAN DAN ALAT KERJA SAT VOL HARGA SAT JML HARGA
(Rp) (Rp)

I. BAHAN BAKU BANGUNAN


Semen Sak 10 90,000 900,000
Pasir Ret 1 600,000 600,000
Kenie 1 inci inci 20 5,000 100,000
Kenie 2 inci inci 20 25,000 500,000
Kenie 3 inci inci 6 25,000 150,000
Kenie 1 1/2" bh 20 15,000 300,000
Kenie 3/4 inci bh 15 4,000 60,000
Kenie 1/2" bh 20 3,500 70,000
Stop Kran 1/2 bh 5 45,000 225,000
stop Kran 3/4 bh 5 50,000 250,000
Stop Kran 2" bh 5 150,000 750,000
Pipa 1" Staf 3 35,000 105,000
Pipa 2 Staf 3 125,000 375,000
Pipa 3 Staf 3 200,000 600,000
Pipa 1 1/2" Staf 2 85,000 170,000
Pipa 1/2 Staf 5 20,000 100,000
Pipa 3/4" Staf 5 25,000 125,000
Testek 1" bh 15 8,000 120,000
Testek 1 1/2 " bh 15 30,000 450,000
Testek 3/4 bh 7 7,000 49,000
Testek 2 bh 5 20,000 100,000
Testek 1/2 bh 15 4,000 60,000
Testek 3 bh 7 10,000 70,000
Ulir Luar 3/4 bh 7 4,000 28,000
Ulir dalam 3/4 bh 7 4,000 28,000
Kenie Ulir dalam 1/2 bh 15 25,000 375,000
Ulir dalam 1/2 bh 15 3,500 52,500
Ulir Luar 1/2 bh 15 3,500 52,500
Henep dos 1 50,000 50,000
Lem Pipa bh 2 65,000 130,000
Tabung Westafel bh 10 65,000 650,000
Tehel dos 10 85,000 850,000
8,445,000

II BAHAN PEMBERSIH
tas plastik kuning pak 20 50,000 1,000,000
tas plastik Hitam besar pak 20 50,000 1,000,000
tas plastik Hitam Kecil pak 20 50,000 1,000,000
saringan kolam bh 7 125,000 875,000
Sepatu bot Psng 3 187,500 562,500
Catelpak bh 3 250,000 750,000
Garu-Garu Besi bh 2 100,000 200,000
Sapu lantai bh 2 50,000 100,000
sapu lidi bh 3 50,000 150,000
ember bh 4 150,000 600,000
pengencer Lemak cirigen 1 1,500,000 1,500,000
Tempat Sampah bh 4 150,000 600,000
Sarung Tangan Plastik bh 4 120,000 480,000
Selang meter 50 12,000 600,000
9,417,500
ALAT KERJA
a. Teropol bh 2 50,000 100,000
b. Palu bh 1 75,000 75,000
c.Oben Listrik bh 1 350,000 350,000
d.Gergaji Besi 1 mata bh 1 25,000 25,000
550,000
8,500,000

,,

17,500,000
PERMINTAAN SANITASI/TRIWULAN

NO NAMA BAHAN DAN ALAT KERJA SAT VOL

I. BAHAN HABIS PAKAI


1. Densol Dos 7
2.Vixal Dos 7
3.Bayclin : Dos 7
a. OK :2 Dos
b. Kebidanan
c. Lab
d.Utd
ePolik Kandungan
f. Icu
e. Igd
g.Sisanya Sumua Ruangan
4. Rinso (Semua Ruangan) Dos 2
5. Clean (Semua Ruangan) Dos 2
II.

ALAT KERJA
6. Sapu Lantai buah 61
7. Pel Lantai buah 61
8. Sapu Taman ( Sapu Lidi Gagang) buah 44
9. Sapu Lawa-lawa buah 33
10. Ember Pel buah 42
11. Kawat ikat 5
12. Kantong Hitam (2000) pak 45
13. Kantong Hitam (1000) pak 25
14. Kantong Hitam Besar(Polyback sampah ) pak 150
15 Kantong Kuning (2000) pak 45
16. Kantong Kuning (1000) pak 25
17. Kanver bks 25
18.Keset buah 50
19.Sikat Closet buah 25
20. Sikat Kamar Mandi Pake kawat buah 25

Anda mungkin juga menyukai