No Uraian Satuan Kuantitas Harga Satuan Jumlah Harga
1 Batu Belah m3 1 350,000 350,000 2 Hebel 10 cm m3 3 750,000 2,250,000 3 Semen MU zak 4 70,000 280,000 4 Semen 50 kg zak 8 55,000 440,000 5 Pasir Cor m3 2 350,000 525,000 6 Split m3 1 350,000 350,000 7 Besi Sloof 15 x 15 m 43 25,000 1,075,000 8 Papan Bekisting lbr 10 30,000 300,000 9 Baja Ringan btg 75,000 - 10 Hollow Baja Ringan btg 4 35,000 140,000 11 Skrup Baja Ringan dus 1 60,000 60,000 12 Skrup Atap Baja Ringan dus 1 60,000 60,000 13 Spandek m2 4 50,000 200,000 14 Pipa PVC 3" btg 3 150,000 450,000 15 Knee 3" buah 3 25,000 75,000 16 Tee 3" buah 1 30,000 30,000 17 Lem PVC buah 1 15,000 15,000 18 Floor drain buah 2 30,000 60,000 19 Cat Aquaproof 5 kg kaleng 2 160,000 320,000 20 Dynabolt 5 cm buah 10 5,000 50,000 21 Mur baut buah 10 7,500 75,000 22 Engsel buah 10 15,000 150,000 23 Selot buah 2 20,000 40,000 24 Alat Bantu Ls 1 500,000 500,000 TOTAL 7,795,000 RINCIAN ANGGARAN MATERIAL No Uraian Satuan Kuantitas Harga Satuan Jumlah Harga 1 Batu Belah m3 1 350,000 350,000 2 Hebel 10 cm m3 3 750,000 2,250,000 3 Semen MU zak 4 70,000 280,000 4 Semen 50 kg zak 8 55,000 440,000 5 Pasir Cor m3 2 350,000 525,000 6 Split m3 1 350,000 350,000 7 Besi Sloof 15 x 15 m 43 25,000 1,075,000 8 Papan Bekisting lbr 10 30,000 300,000 9 Baja Ringan btg 15 70,000 1,050,000 10 Hollow 4x4 Baja Ringan btg 4 30,000 120,000 11 Skrup Baja Ringan dus 0.5 120,000 60,000 12 Skrup Atap Baja Ringan dus 0.5 80,000 40,000 13 Spandek m2 30 50,000 1,500,000 14 Pipa PVC 3" btg 3 150,000 450,000 15 Knee 3" buah 3 25,000 75,000 16 Tee 3" buah 1 30,000 30,000 17 Lem PVC buah 1 15,000 15,000 18 Floor drain buah 2 30,000 60,000 19 Cat Aquaproof 5 kg kaleng 2 160,000 320,000 20 Dynabolt 5 cm buah 10 5,000 50,000 21 Mur baut buah 10 5,000 50,000 22 Engsel buah 10 15,000 150,000 23 Selot buah 2 20,000 40,000 24 Alat Bantu Ls 1 500,000 500,000 TOTAL 10,080,000 RINCIAN ANGGARAN BIAYA No Uraian Satuan Kuantitas Harga Satuan Jumlah Harga Pagar Keliling 1 Pagar BRC 240 x 120 m 50.00 360,000 18,000,000 2 Pintu Pagar BRC unit 3.00 1,250,000 3,750,000 3 Tiang Pagar BRC unit 24.00 110,000 2,640,000 4 Pasangan Batu Belah (Pondasi) m3 5.00 600,000 3,000,000 5 Pasangan Bata Merah m2 20.00 100,000 2,000,000 6 Plesteran m2 40.00 50,000 2,000,000 7 Acian m2 40.00 25,000 1,000,000 8 Pengecatan m2 40.00 15,000 600,000 Sub Total 32,990,000 Lapangan Olahraga 1 Pasangan Bata Merah m2 20.00 100,000 2,000,000 2 Plesteran m2 20.00 50,000 1,000,000 3 Acian m2 10.00 25,000 250,000 4 Urugan Tanah (Puing) m3 19.69 50,000 984,375 5 Beton K-250 m3 13.13 1,500,000 19,687,500 6 Pengecatan m2 131.25 25,000 3,281,250 Sub Total 27,203,125 TOTAL 60,193,125 Satuan Kuantitas Harga Satuan Jumlah Harga No Uraian (Rp.) (Rp.)
1 Persiapan Ls 1.00 1,250,000 1,250,000
Lapangan Olah Raga 1 Pasangan Bata Merah m2 21.05 100,000 2,105,000 2 Plesteran m2 21.05 50,000 1,052,500 3 Acian m2 10.53 25,000 263,125 4 Urugan Tanah (Puing) m3 19.69 50,000 984,375 5 Beton K-250 m3 13.13 1,500,000 19,687,500 6 Pengecatan m2 131.25 25,000 3,281,250 Pagar Keliling 1 Pagar BRC 240 x 120 m 50.40 360,000 18,144,000 2 Pintu Pagar BRC unit 3.00 1,250,000 3,750,000 3 Tiang Pagar BRC unit 24.00 110,000 2,640,000 4 Pasangan Batu Belah (Pondasi) m3 5.04 600,000 3,024,000 5 Pasangan Bata Merah m2 20.16 100,000 2,016,000 6 Plesteran m2 40.32 50,000 2,016,000 7 Acian m2 40.32 25,000 1,008,000 8 Pengecatan m2 40.32 15,000 604,800 TOTAL 61,826,550 PPN 6,182,655 GRAND TOTAL 68,009,205
Satuan Kuantitas Harga Satuan Jumlah Harga
No Uraian (Rp.) (Rp.) 1 Persiapan Ls 1.00 - Lapangan Olah Raga 1 Pasangan Bata Merah m2 21.05 - 2 Plesteran m2 21.05 - 3 Acian m2 10.53 - 4 Urugan Tanah (Puing) m3 19.69 - 5 Beton K-250 m3 13.13 - 6 Pengecatan m2 131.25 - Pagar Keliling 1 Pagar BRC 240 x 120 m 50.40 - 2 Pintu Pagar BRC unit 3.00 - 3 Tiang Pagar BRC unit 24.00 - 4 Pasangan Batu Belah (Pondasi) m3 5.04 - 5 Pasangan Bata Merah m2 20.16 - 6 Plesteran m2 40.32 - 7 Acian m2 40.32 - 8 Pengecatan m2 40.32 - TOTAL - PPN - GRAND TOTAL -
DAFTAR KUANTITAS DAN HARGA
Satuan Kuantitas Harga Satuan Jumlah Harga No Uraian (Rp.) (Rp.) 1 Persiapan Ls 1.00 - 2 Pasangan Bata Merah m2 21.05 - 3 Plesteran m2 21.05 - 4 Acian m2 10.53 - 5 Urugan Tanah (Puing) m3 19.69 - 6 Beton K-250 m3 13.13 - 7 Pengecatan m2 131.25 - TOTAL - PPN 10% - GRAND TOTAL - Harga Jumlah No Uraian Satuan Kuantitas Satuan (Rp.) Harga (Rp.)