Anda di halaman 1dari 11

PERHITUNGAN BERAT KAPAL KOSONG

1.1 Ukuran Utama Kapal

Item Value Satuan


Jenis Kapal General Cargo
Lbp 91.03 m ganti
Lwl 93.58 m ganti
B 16.35 m ganti
H 7.73 m ganti
T 5.35 m ganti
Cb 0.661 ganti
Vd 13 knots ganti
BHP 2682 HP ganti
Wme 9.2 ton ganti
VDisp 5411.80 m3 ganti
LCB 0.20086 m ganti
HDoubleBottom 1m ganti
MTC 33.168 Tonm ganti
LCF -2.944 m ganti

1.2 Perhitungan Berat Kapal

A. Berat Baja Kapal Kosong


Berat Baja Kapal 1166.97 Ton ganti
LCG Hull 1.5 m sama

B. Berat Propeller Dan Poros


Berat Propeller 1.4387631 11294.29
LCG Propeller

Berat Poros
LCG Poros

Berat Total
LCG Total

C. Berat Outfitting
1 Windlass 11.6 ton sama
LCG Outfitting 31.5 m hapus

2 Winches 4.6 ton sama


LCG Outfitting 29.1726 m hapus
3 Mesin Utama 40 ton sama
LCG Outfitting -26.25 m hapus

4 crane sama
LCG Outfitting 1.5 m hapus

D. Berat Cadangan

PERHITUNGAN PRA PELUNCURAN

1.1 Perhitungan Berat dan Titik Berat Peluncuran

No Bagian Kapal Berat (ton) LCG Hasil


1 Hull 1166.9691733 1.5 1750.454
2 Propeller & Shaft 0 0 0
3 Outfitting 11.6 31.5 365.4
4 Cadangan 0 0 0
Ʃ1 1178.5691733 Ʃ1 2115.854

Berat perlengkapan peluncuran 7% - 16% daru LWT Kapal kosong

LWT Perlengkapan peluncuran 7% x LWT kapal kosong


82.49984213

Total berat dan titik berat peluncuran adalah:


P LWT kapal kosong + LWT Perlengkapan
1261.0690154212

LCG (LWT kapal kosong x LCG) + (LWT perlengkapan x LCG)


Berat Peluncuran

Displacement kapal setelah adanya perlengkapan


Vperlengkapan =
103.12480266

ɣVPerlengkapan = Vperlengkapan x ρair laut


=
84.562338184

∆Kapal = ρ - ɣV

1176.5066772

Perhitungan dimensi sepatu luncur yang digunakan pada saat


peluncuran memanjang adalah sebagai berikut:

Panjang Sepatu Luncur


S = 80% x LBP
72.824 meter

Tekanan rata-rata yang diijinkan


untuk LBP = 100 meter, maka 20 ton/m
untuk LBP = 150 meter, maka 25 ton/m

Sehingga untuk LBP = 91.3 m, tekanan rata-rata


σmax = 20+((73-100)/(150-100))*(25-20)
17.3 ton/m

Lebar sepatu luncur


S = P/(n x b x σmax)
Dimana
P = berat peluncuran 1261.0690154 ton
n = Jumlah sepatu luncur 3 buah sama
S = Panjang sepatu luncur 73 m

Sehingga
b = P/(n x S x σmax)
0.3328500582 meter

Direncanakan lebar sepatu luncur


0.4

Tinggi sepatu luncur


Tinggi minimum sepatu peluncuran menurut "Principals of Naval Architecture"

Tinggi sepatu luncur yang direncanakan adalah 30 cm


0.3 meter

Menentukan ukuran landasan luncur


Kemiringan landasan luncur untuk pengerjaan Tugas Merancang 3° ini
disamakan dengan PT. Don dan Perkapalan Surabaya

Panjang landasan dibawah garis air (λ)


λ= 25 m sama
Sudut kemiringan landasan terhadap air (α) sama
α= 3° sama
Kedalaman air pada ujung landasan sama
H = sin α x λ sama
= 1.31 m sama

1.1 Perhitungan Bonjean Kapal


Jarak Tiap Station 4.565 Jarak Tiap Lagkah : 10
Langkah 1
Station Waterline Skala Bonjean Luasan F.S
0 0 0 1
1 0.2848 1.1392 0.0073 0.219 4
2 0.0456 0.1824 0.0036 0.108 1

Langkah 2
Station Waterline Skala Bonjean Luasan F.S
0 0 0 0 0 1
1 0.8089 3.2356 0.209 6.27 4
2 0.5697 2.2788 0.0441 1.323 2
3 0.3304 1.3216 0.0456 1.368 4
4 0.0912 0.3648 0.0219 0.657 1
Total

Langkah 3
Station Waterline Skala Bonjean Luasan F.S
0 0 0 0 0 1
1 1.333 5.332 0.039 1.17 4
2 1.0973 4.3892 0.059 1.77 2
3 0.8545 3.418 0.101 3.03 4
4 0.6153 2.4612 0.1377 4.131 2
5 0.376 1.504 0.1314 3.942 4
6 0.1367 0.5468 0.0881 2.643 1
Total

Langkah 4
Station Waterline Skala Bonjean Luasan F.S
0 0 0 0 0 1
1 1.8571 7.4284 0.0555 1.665 4
2 1.6178 6.4712 0.109 3.27 2
3 1.3786 5.5144 0.183 5.49 4
4 1.1393 4.5572 0.257 7.71 2
5 0.9001 3.6004 0.277 8.31 4
6 0.6608 2.6432 0.2624 7.872 2
7 0.4216 1.6864 0.1983 5.949 4
8 0.1823 0.7292 0.134 4.02 1

Total

Langkah 5
Station Waterline Skala Bonjean Luasan F.S
0 0 0 0 0 1
1 2.9052 11.6208 0.071 2.13 4
2 2.666 10.664 0.1599 4.797 2
3 2.4267 9.7068 0.2695 8.085 4
4 2.1875 8.75 0.3928 11.784 2
5 1.9482 7.7928 0.4435 13.305 4
6 1.709 6.836 0.4367 13.101 2
7 1.4697 5.8788 0.3897 11.691 4
8 1.2305 4.922 0.3228 9.684 2
9 0.9912 3.9648 0.2431 7.293 4
10 0.752 3.008 0.1723 5.169 2
11 0.5127 2.0508 0 4
12 0.2735 1.094 0 1

Total
Langkah 6
Station Waterline Skala Bonjean Luasan F.S
0 0 0 0 0 1
1 2.4003 9.6012 0.087 2.61 4
2 2.2265 8.906 0.2259 6.777 2
3 2.0527 8.2108 0.3824 11.472 4
4 1.879 7.516 0.5471 16.413 2
5 1.7052 6.8208 0.6199 18.597 4
6 1.5314 6.1256 0.6081 18.243 2
7 1.3576 5.4304 0.5505 16.515 4
8 1.1839 4.7356 0.5116 15.348 2
9 1.0101 4.0404 0.4373 13.119 4
10 0.828 3.312 0.3571 10.713 2
11 0.6625 2.65 0.2867 8.601 4
12 0.488 1.952 0.209 6.27 2
13 0.315 1.26 0.1305 3.915 4
14 0.1412 0.5648 0.0569 1.707 1
Total

Langkah 7
Station Waterline Skala Bonjean Luasan F.S
0 0 0 0 0 1
1 2.837 11.348 0.1029 3.087 4
2 2.6632 10.6528 0.2905 8.715 2
3 2.4895 9.958 0.4976 14.928 4
4 2.3157 9.2628 0.7056 21.168 2
5 2.1419 8.5676 0.8 24 4
6 1.9681 7.8724 0.7965 23.895 2
7 1.7944 7.1776 0.7407 22.221 4
8 1.6206 6.4824 0.7002 21.006 2
9 1.4468 5.7872 0.6254 18.762 4
10 1.2648 5.0592 0.5454 16.362 2
11 1.0993 4.3972 0.4755 14.265 4
12 0.9255 3.702 0.3794 11.382 2
13 0.7517 3.0068 0.311 9.33 4
14 0.578 2.312 0.2328 6.984 2
15 0.4042 1.6168 0.1392 4.176 4
16 0.2304 0.9216 0.0654 1.962 2

17 0.0566 0.2264 0.0114 0.342 4


Total

Langkah 8
Station Waterline Skala Bonjean Luasan F.S
0 0 0 0 0 1
1 3.2737 13.0948 0.1173 3.519 4
2 3.1 12.4 0.35 10.5 2
3 2.9262 11.7048 0.6001 18.003 4
4 2.7524 11.0096 0.8592 25.776 2
5 2.5787 10.3148 0.9782 29.346 4
6 2.4049 9.6196 0.9851 29.553 2
7 2.2311 8.9244 0.9307 27.921 4
8 2.0573 8.2292 0.8719 26.157 2
9 1.8836 7.5344 0.7963 23.889 4
10 1.7015 6.806 0.7167 21.501 2
11 1.536 6.144 0.6441 19.323 4
12 1.3622 5.4488 0.5679 17.037 2
13 1.1885 4.754 0.4822 14.466 4
14 1.0147 4.0588 0.3942 11.826 2
15 0.8409 3.3636 0.2895 8.685 4
16 0.6671 2.6684 0.1862 5.586 2
17 0.4934 1.9736 0.1002 3.006 4
18 0.3196 1.2784 0.342 10.26 1.5
18.5 0.2245 0.898 0.17405 5.2215 2
19 0.1458 0.5832 0.0061 0.183 1
Total

Langkah 9
Station Waterline Skala Bonjean Luasan F.S
0 0 0 0 0 1
1 5.0015 20.006 0.1173 3.519 4
2 4.7623 19.0492 0.35 10.5 2
3 4.523 18.092 0.6001 18.003 4
4 4.2838 17.1352 0.8592 25.776 2
5 4.0445 16.178 0.9782 29.346 4
6 3.8053 15.2212 0.9851 29.553 2
7 3.566 14.264 0.9307 27.921 4
8 3.3268 13.3072 0.8719 26.157 2
9 3.0875 12.35 0.7963 23.889 4
10 2.8484 11.3936 0.7167 21.501 2
11 2.609 10.436 0.6441 19.323 4
12 2.3698 9.4792 0.5679 17.037 2
13 2.1305 8.522 0.4822 14.466 4
14 1.8913 7.5652 0.3942 11.826 2
15 1.6522 6.6088 0.2895 8.685 4
16 1.4128 5.6512 0.1862 5.586 2
17 1.1735 4.694 0.1002 3.006 4
18 0.9343 3.7372 0.342 10.26 2
19 0.695 2.78 0.17405 5.2215 4
20 0.4553 1.8212 0.0061 0.183 1
Total
HK
0 V= 1.49732
0.876 0.0016
0.108
0.984

HK
0 V= 51.51603
25.08
2.646
5.472
0.657
33.855

HK
0 V= 71.53812
4.68
3.54
12.12
8.262
15.768
2.643
47.013

HK
0 V= 193.8299
6.66
6.54
21.96
15.42
33.24
15.744
23.796
4.02

127.38

HK
0 V= 0
8.52
9.594 Station Waterline Skala Bonjean Luasan F.S HK
32.34 12 0.2735 1.094 0 1 0
23.568 12.5 0.1539 0.6156 0.071 2.13 4 8.52
53.22 13 0.0342 0.1368 0.1599 4.797 2 9.594
26.202
46.764
19.368
29.172
10.338
0
0

259.086

HK
0 V= 682.5451
10.44
13.554
45.888
32.826
74.388
36.486
66.06
30.696
52.476
21.426
34.404
12.54
15.66
1.707
448.551

HK
0 V= 1015.548
12.348
17.43
59.712
42.336
96
47.79
88.884
42.012
75.048
32.724
57.06
22.764
37.32
13.968
16.704
3.924

1.368
667.392

HK
0 V= 1391.595 lwt = 1176.507
14.076
21
72.012
51.552
117.384
59.106
111.684
52.314
95.556
43.002
77.292
34.074
57.864
23.652
34.74
11.172
12.024
15.39
10.443
0.183
914.52

HK
0 V= 1415.292 lwt = 1176.507
14.076
21
72.012
51.552
117.384
59.106
111.684
52.314
95.556
43.002
77.292
34.074
57.864
23.652
34.74
11.172
12.024
20.52
20.886
0.183
930.093