A Abutment A-1 c
b d
F1 16 150 0.075 1.480 0.240 1.280 0.200
F7 25 150 4.400
B Pelat Lantai
P1 16 200 0.075 0.100 1.450 3.502 3.502 1.450 0.100 0.075
a d
S2 b c 16 200 0.080 0.150 4.950 0.080
a
c
BAJA TULANGAN BJTP 280 POLOS DAN BJTS 420 SIRIP
c
E TIANG SANDARAN
13 200 0.065 0.375 0.375 0.200 0.175 0.580
d
c e
R1
b f
a
c
R3 13 200 0.065 0.550 0.065
a b
c
BAJA TULANGAN BJTP 280 POLOS DAN BJTS 420 SIRIP
c
BAJA TULANGAN BJTP 280 POLOS DAN BJTS 420 SIRIP
c
BAJA TULANGAN BJTP 280 POLOS DAN BJTS 420 SIRIP
c
BAJA TULANGAN BJTP 280 POLOS DAN BJTS 420 SIRIP
aa baf cbe
b d cc
BAJA TULANGAN BJTP 280 POLOS DAN BJTS 420 SIRIP
c
BAJA TULANGAN BJTP 280 POLOS DAN BJTS 420 SIRIP
Sub Total
280 POLOS DAN BJTS 420 SIRIP
0.000 0.000
0.000 0.000
- 0.00 0.00
BACK UP
PERHITUNGAN VOLUME BETON (fc 3
PANJANG DIMENS
NO GAMBAR
(M) lebar
20
5
20
475 25
Sub Total
KOEFISIEN
TOTAL
ETON (fc 30)
lebar Tebal/Tinggi ( Bh ) ( M3 )
262.59
1.00
262.59