Anda di halaman 1dari 117

Struktur Beton II

INPUT DATA : f 'c = 25 Mpa H1 = 3.5 m


fy = 240 Mpa H2 = 3.5 m
L1 = 5 m H3 = 3.5 m
L2 = 4 m

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

B
###
###

A A
###

B
5.00 m 5.00 m 5.00 m

DENAH LANTAI 1 dan 2


###
###

5.00 m 5.00 m 5.00 m

POTONGAN A - A

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

B3 B1 B3
###

B2 B2 B2 B2

B3 B5 B5
###

B4 B6 B6 B4

A B3 B5 B5 A
###

B2 B2 B2 B2

B3 B1 B3

5.00 m 5.00 m 5.00 m

DENAH BALOK

ATAP
###

LANTAI 2
###

LANTAI 1

5.00 m 5.00 m 5.00 m

POTONGAN A - A

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

###
###

4.00 m 4.00 m 4.00 m

POTONGAN B - B

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

141
66000
66141

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Diketahui sebuah gedung
A
Ruko berlantai dua dengan tiga
B
pias seperti tergambar : C D

1
y

DENAH GEDUNG

PORTAL ARAH X

PORTAL ARAH Y

Dengan data-data sebagai berikut :

Pelat lantai yang terbuat dari beton bertulang dengan :


- Mutu Beton ( f 'c) = 25 MPa
- Mutu Baja Tulangan ( fy ) = 240 MPa
- Bj. Beton = 2400 kg/m3

Ditanyakan :
Rencanakan dimensi balok dan kolom
Rencanakan Penulangan Balok Kolom
Gambar/Sketsa Konstruksi
Penyelesaian :
DIMENSI AWAL BALOK
Untuk perhitungan, tebal pelindung/selimut beton menurut SNI 2013 Pasal 7.7.1,
untuk balok = 40 mm = 4 cm

Sedangkan untuk perencanaan tinggi balok (hmin) yang fy-nya selain dari 420 Mpa nilainya
harus dikalikan dengan (0,4 + fy/700), SNI 2013 Tabel 9.5(a). Dari Soal fy = 240 , maka :
faktor penggandanya = (0,4 + 240 / 700) = 0.743

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Untuk perhitungan lebar balok berdasarkan hubungannya dengan dmin yang ekonomis
adalah = hmin - selimut beton, yaitu :
dmin = (1,5 ---- 2,0) . b
diambil b = dmin/1,5.
Lihat denah balok untuk lantai 2, berdasarkan SNI 1991 Tabel 9.5(a) :

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
a. Untuk Balok B1, dan B5
Diketahui L = 5000 mm Asumsi dua ujungnya menerus.
L 5000
hmin = 0.743 = 0.743 = 176.871 mm = 17.687 cm
21 21
dmin = hmin - selimut beton
= 17.687 - 4
= 13.687 cm
dmin 13.687
b = = = 9.125 cm
1.5 1.5
Jadi ukuran baloknya adalah b x h = 9.125 x 17.687 cm²
b. Untuk Balok B2
Diketahui L = 4000 mm Asumsi satu ujungnya menerus.
L 4000
hmin = = = 216.216 mm = 21.622 cm
18.5 18.5
dmin = hmin - selimut beton
= 21.622 - 4
= 17.622 cm
dmin 17.622
b = = = 11.748 cm
1.5 1.5
Jadi ukuran baloknya adalah b x h = 11.748 x 21.622 cm²

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
c. Untuk Balok B3
Diketahui L = 5000 mm Asumsi satu ujungnya menerus.
L 5000 mm
hmin = = = 270.270 mm = 27.027 cm
18.5 18.5
dmin = hmin - selimut beton
= 27.027 - 4
= 23.027 cm
dmin 23.027
b = = = 15.351 cm
1.5 1.5
Jadi ukuran baloknya adalah b x h = 15.351 x 27.027 cm²
d. Untuk Balok B4 dan B6
Diketahui L = 4000 mm Asumsi dua ujungnya menerus.
L 4000
hmin = = = 190.476 mm = 19.048 cm
21 21
dmin = hmin - selimut beton
= 19.048 - 4
= 15.048 cm
dmin 15.048
b = = = 10.032 cm
1.5 1.5
Jadi ukuran baloknya adalah b x h = 10.032 x 19.048 cm²

Tabel Rekapitulasi Ukuran Balok

Dimensi Balok (cm2)


Balok
b h
B1 dan B5 9.125 x 17.687
B2 11.748 x 21.622
B3 15.351 x 27.027
B4 dan B6 10.032 x 19.048

Dalam perencanaan konstruksi, biasanya diambil ukuran balok yang seragam.


Ketentuan pengambilan ukuran balok yang sama yaitu sekurang-kurangnya diambil
sama dengan ukuran balok yang terbesar : 15.351 x 27.027 .
Tapi dengan mempertimbangkan nilai fy dan fc', kami mengambil ukuran balok
sebesar (b x h) :
- Untuk lantai atap = ( 20 x 30 ) cm2
- Untuk lantai dua = ( 20 x 30 ) cm2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
I.2. TEBAL PLAT
Menurut SNI 2847:2013 Pasal 9.5.3.3 :
" Untuk plat dengan balok yang membentang di antara tumpuan pada semua sisinya,
tebal minimumnya, h, harus memenuhi ketentuan sebagai berikut :
(a) Untuk afm yang sama atau lebih kecil dari 0.2, harus menggunakan 9.5.3.2;
(b) Untuk afm lebih besar dari 0.2 tapi tidak lebih dari 2.0, t tidak boleh kurang dari
fy
ln 0.8 +
1400
t=
36 + 5b + am - 0.2

dan tidak boleh kurang dari 125 mm;


(c) Untuk afm lebih besar dari 2.0, ketebalan plat minimum tidak boleh kurang dari:
fy
ln 0.8 +
1400
t=
36 + 9b

dan tidak boleh kurang dari 90 mm;

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

B3 B5

Panel 3 Panel 4 LL = Bentang panjang


B4 B6 B4 4.00 m LS = Bentang pendek

B3 B5

Panel 1 Panel 2
B2 B2 B2 4.00 m

B3 B1

5.00 m 5.00 m

y
Plat - plat diwakili oleh panel seperti gambar diatas.
tinjauan balok tepi dan balok tengah :
x Memanjang : arah x
Melintang : arah y

Menurut SNI 2847:2013 Pasal 13.2.4, untuk konstruksi monolit atau komposit
penuh, suatu balok mencakup bagian dari plat pada setiap sisi balok yang membentang dengan jarak
yang sama dengan proyeksi balok di atas atau di bawah slab tersebut, yang mana yang lebih besar, tetapi
tidak lebih besar dari empat kali tebal slab, seperti pada gambar sbb:
bE bE

t t

h h
(h-t) < 4t (h-t) < 4t (h-t) < 4t

bW bW

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

Sebenarnya bagian - bagian kecil dari plat (flans balok) yang telah diperhitungkan dalam balok
tidak bolah diperhitungkan untuk Is, tapi ACI mengizinkan penggunaan lebar total portal Eqivalen
dalam perhitungan Is, sehingga :
Ecb . Ib
α=
Ecs . Is
Lebar efektif balok pinggir diambil nilai terkecil :
( h - t ) <= 4 t
Lebar efektif balok tengah / dalam (Balok T) harus diambil nilai terkecil :
2 ( h - t ) <= 8 t
Momen Inersia dari penampang balok dengan flans terhadap sumbu pusat ialah :
bw . h3
Ib = K x
12
Dimana :

bE  t  2
bE  t 3
1   1  t  t
    4  6    4      1  
  
K 
bw  h  h h bw  h 
bE t
1   1   
bw  h
h = tinggi total balok
= lebar total plat
= lebar efektif flans
= lebar badan balok
bE t
Suatu tetapan tanpa dimensi sebagai fungsi dari - 1 dan
bw h
Momen Inersia plat :
1
Ib = x L x t3
12
Rasio kekakuan lentur balok ( Ecb . Ib ) terhadap kekakuanlentur plat ( Ecs . Is ) dengan lebar
yang dibatasi dalam arah lateral oleh suatu sumbu dari panel yang berbatasan ( bila ada ) pada tiap
sisi balok, yaitu :
Ecb . Ib Ecb = Modulus elastisitas balok beton
a=
Ecs . Is Ecs = Modulus elastisitas plat beton
A. Perhitungan a balok pada plat / panel
a. Balok tepi melintang (untuk balok B2 dan B4)
Ditaksir tebal plat t = 12 cm
Lebar efektif bE = bw + (h - t)
= 20 + ( 30 - 12 ) = 38 cm (terkecil)
Atau bE = bw + 4 x t
= 20 + 4 x 12 = 68 cm

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

38 cm

12 cm

30 cm

20 cm 480 cm 20 cm 480 cm
500 cm 500 cm

bE  t 2
bE  t 3 
1   1   t t
    4  6    4      1  
  
 b w   h    h   h   b w  h 
K 
bE  t
1   1  
 
 b w  h
38 12 12 12 2 38 12 3
1 + - 1 x x 4 - 6 x + 4 x + - 1 x
20 30 30 30 20 30
K=
38 12
1 + - 1 x
20 30
1 + 0.360 x 2.2976
K=
1.360
= 1.343
bW x h3 20 x 30 3
Ib = K = x = 1.343 x = 60456.706 cm4
12 12
L 500 3
. t3 . 12
2 2
Is = = = 36000 cm4
12 12
Ecb .Ib 60456.706
a= = = 1.679 Ecb = Ecs
Ecs .Is 36000
b. Balok tepi memanjang (untuk balok B1 dan B3)
Ditaksir tebal plat t = 12 cm
Lebar efektif bE = bw + (h - t)
= 20 + ( 30 - 12 ) = 38 cm (terkecil)
Atau bE = bw + 4 x t
= 20 + 4 x 12 = 68 cm
38 cm

30 cm

20 cm 380 cm 20 cm 380 cm
400 cm 400 cm

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

bE t t t


2
bE   t 3
1  b  1    h    4  6  h   4  h    b  1   h  
K 
 w        w   
bE t
1   1  
bw  h
38 12 12 12 2 38 12 3
1 + - 1 x x 4 - 6 x + 4 x + - 1 x
20 30 30 30 20 30
K=
38 12
1 + - 1 x
20 30
1 + 0.360 x 2.2976
K=
1.360
= 1.343
bW x h3 20 x 30 3
Ib = K = x = 1.343 x = 60456.706 cm4
12 12
L 400 3
x t3 x 12
2 2
Is = = = 28800 cm4
12 12
Ecb .Ib 60456.706
a= = = 2.099 Ecb = Ecs
Ecs .Is 28800
c. Balok tengah melintang (untuk balok B2 dan B6)
Ditaksir tebal plat t = 12 cm
Lebar efektif bE = bw + 2 x (h - t)
= 20 + 2 x (30 - 12 ) = 56 cm (terkecil)
Atau bE = bw + 8 x t
= 20 + 8 x 12 = 116 cm

56 cm

30 cm

20 cm 480 cm 20 cm 480 cm
500 cm 500 cm

bE t t t


2
bE   t 3
1  b  1   h    4  6  h   4  h    b  1    h  
K 
 w        w   
bE t
1   1   
bw  h

56 12 12 12 2 56 12 3
1 + - 1 x x 4 - 6 x + 4 x + - 1 x
20 30 30 30 20 30
K=
56 12
1 + - 1 x
20 30
1 + 0.720 x 2.3552
K=
1.720
= 1.567
bW x h3 20 x 30 3
Ib = K = x = 1.567293 x = 70528.186 cm4
12 12
L x t3 500 x 12 3
Is = = = 72000 cm4
12 12
Ecb .Ib 70528.186
a= = = 0.980 Ecb = Ecs
Ecs .Is 72000
d. Balok tengah memanjang (untuk balok B3 dan B5)
Ditaksir tebal plat t = 12 cm
Lebar efektif bE = bw + 2 x (h - t)
= 20 + 2 x (30 - 12 ) = 56 cm (terkecil)
Atau bE = bw + 8 x t
= 20 + 8 x 12 = 116 cm

56 cm

30 cm

20 cm 380 cm 20 cm 380 cm
400 cm 400 cm

bE  t 2
bE  t 3
1   1 t t
    4  6    4      1  
  
 b w   h    h   h   b w  h 
K 
bE  t
1   1  
 
bw  h
56 12 12 12 2 56 12 3
1 + - 1 x x 4 - 6 x + 4 x + - 1 x
20 30 30 30 20 30
K=
56 12
1 + - 1 x
20 30
1 + 0.720 x 2.3552
K=
1.720
= 1.567293
bW x h3 20 x 30 3
Ib = K = x = 1.567293 x = 70528.186 cm4
12 12
L x t3 400 x 12 3
Is = = = 57600 cm4
12 12

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Ecb .Ib 70528.186
a= = = 1.224 Ecb = Ecs
Ecs .Is 57600

B. Perhitungan kontrol tebal plat

a1 = 1.679
a2 = 2.099
a4 a4
4.00 m a3 = 0.980
a1 Panel 3 a3 Panel 4 a3 a4 = 1.224

a4 a4
4.00 m
a1 Panel 1 a3 Panel 2 a3
a2 a2

5.00 m 5.00 m

a. Panel 1
Sa a1 + a2 + a3 + a4
am = =
n 4
1.679 + 2.099 + 0.980 + 1.224
= = 1.496
4
Ln1 480
b= = = 1.263
Ln2 380
fy
Ln1 x 0.8 +
1400
tmin =
36 + 5 b x am - 0.2

420
480 x 0.8 +
1400
tmin =
36 + 5 1.263 x 1.496 - 0.2

528.000
tmin = = 11.950 cm
36 + 8.183
fy
Ln1 x 0.8 +
1400 528.000
tmin = = = 11.147 cm
36 + 9 b 36 + 9 x 1.263

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

b. Panel 2
Sa a2 + a3 + a3 + a4
am = =
n 4
2.099 + 0.980 + 0.980 + 1.224
= = 1.321
4
L1 480
b= = = 1.263
Ls 380
fy
Ln1 x 0.8 +
1400
tmin =
36 + 5 b x am - 0.2

420
480 x 0.8 +
1400
tmin =
36 + 5 1.263 x 1.321 - 0.2

528.000
tmin = = 12.257 cm
36 + 7.078
fy
Ln1 x 0.8 +
1400 528.000
tmin = = = 11.147 cm
36 + 9 b 36 + 9 x 1.263

c. Panel 3
Sa a1 + a3 + a4 + a4
am = =
n 4
1.679 + 0.980 + 1.224 + 1.224
= = 1.277
4
L1 480
b= = = 1.263
Ls 380
fy
Ln1 x 0.8 +
1400
tmin =
36 + 5 b x am - 0.2

420
480 x 0.8 +
1400
tmin =
36 + 5 1.263 x 1.277 - 0.2

528.000
tmin = = 12.336 cm
36 + 6.802
fy
Ln1 x 0.8 +
1400 528.000
tmin = = = 11.147 cm
36 + 9 b 36 + 9 x 1.263

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

d. Panel 4
Sa a3 + a3 + a4 + a4
am = =
n 4
0.980 + 0.980 + 1.224 + 1.224
= = 1.102
4
L1 480
b= = = 1.263
Ls 380
fy
Ln1 x 0.8 +
1400
tmin =
36 + 5 b x am - 0.2

420
480 x 0.8 +
1400
tmin =
36 + 5 1.2631578947 x 1.102 - 0.2

528.000
tmin = = 12.663 cm
36 + 5.697

fy
Ln1 x 0.8 +
1400 528.000
tmin = = = 11.147 cm
36 + 9 b 36 + 9 x 1.263

Tabel Rekapitulasi Tebal Plat

TEBAL MINIMUM TEBAL MINIMUM


PANEL PLAT (cm) PLAT (cm)
SNI 2013 9-12 SNI 2013 9-13
1 11.950 11.147
2 12.257 11.147
3 12.336 11.147
4 12.663 11.147
Dalam perhitungan tabel plat diperoleh penggunaan tebal plat minimum 11.950 cm
dan maksimumnya adalah 11.1467 cm . Tapi dalam praktek, tebal plat yang digunakan
minimum 12 cm, sehingga :
- Untuk atap digunakan plat setebal = 12 cm
- Untuk lantai 2 digunakan plat setebal = 12 cm

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
I.2. DIMENSI KOLOM
I.2.1 Tinjau Kolom Tengah

2.5 m 2.5 m

4m

2m

2m

4m

5m 5m

Beban yang dipikul menurut SNI 1727:2013 Tabel 4-1 untuk gedung :
- Berat Jenis Beton = 2400 kg/m3
- Panjang kolom = 4 + 3.5 = 7.5 m
- Berat beban hidup untuk gedung Ruko = 200 kg/m3
- Beban hidup untuk plat atap = 100 kg/m2
- Berat volume air = 1000 kg/m3
- Berat plafond + duching = 20 kg/m2
- Finishing plat atap (3 cm) = 63 kg/m2
- Finishing plat lantai (2 cm) = 42 kg/m2
- Total berat konsol (konstruksi kayu + atap genteng) sekeliling = 2700 kg

Pembebanan yang bekerja hanya pembebanan gravitasi saja, tanpa beban gempa yang terjadi
yang terdiri dari :
1. Beban mati (DL)
2. Beban hidup (LL)

A. Kolom pada lantai 2 (Direncanakan dimensi ) 30 x 30 cm²


Beban hidup (LL)
- Beban hidup plat atap : 5 x 4 x 100 = 2000 kg
- Beban air pada lantai atap (1 cm) : 5 x 4 x 0.01 x 1000 = 200 kg
= 2200 kg

Beban mati (DL)


- Beban kolom lantai 3 + konsol : 0.3 x 0.3 x 3.5 x 2400 + 2700 = 3456 kg
- Beban plat atap : 0.12 x 5 x 4 x 2400 = 5760 kg
Berat balok atap
- arah x (memanjang) : 0.2 x 0.3 x (5.00 - 0.20) 2400 = 691.2 kg
- arah y (melintang) : 0.2 x 0.3 x 4 x 2400 = 576 kg
- Berat finishing atap : 5 x 4 x 63 = 1260 kg
- Berat plafond + ducling : 5 x 4 x 20 = 400 kg
= 12143.2 kg

Menurut SNI 2847:2013 Pasal 9.2.1, kuat perlu (U) yang menahan beban mati (D) dan beban hidup (L)
paling tidak harus sama dengan :
U = 1.2 DL +
1.6 LL sehingga :
= 1.2 x 12143.2 + 1.6 x 2200 = 18091.84 kg
Pu = U x 9.81 = 18091.84 x 9.81 = 177480.95 N
Menurut SNI 2847:2013 Pasal 10.3.6.1, kuat tekan rancang komponen struktur tidak boleh lebih besar dari :

ΦPnmax = 0.85 x Φ x 0.85 x f 'c x Ag - Ast + fy x Ast


dimana :
f = Faktor reduksi f = 0,65 untuk aksial tekan dengan aksial lentur komponen struktur
dengan tulangan sengkang biasa, SNI 1991 Pasal 3.2.3.2.2.b
f 'c = Kuat tekan beton yang disyaratkan = 25 MPa
fy = Tegangan leleh baja yang disyaratkan = 240 MPa
Ag = Luas bruto penampang = 300 x 300 = 90000 mm2
rt = Rasio penulangan kolom (0,01 - 0,03), diambil rt = 0,02
Ast = Luas tulangan total = rt . Ag = 0.02 x 90000 = 1800 mm2
Sehingga :
ΦPnmax = 0.85 x 0.65 x 0.85 x 25 x 90000 - 1800 + 240 x 1800
= 1274203.13 N
Syarat :
ΦPnmax > Pu
1274203.13 > 177480.95 Aman !!

B. Kolom pada lantai 1 ( Direncanakan dimensi ) 30 x 30 cm²


Beban hidup (LL)
- Beban hidup plat atap : 5 x 4 x 100 = 2000 kg
- Beban hidup lantai 03 : 5 x 4 x 200 = 4000 kg
- Beban air pada lantai atap (1 cm) : 5 x 4 x 0.01 x 1000 = 200 kg
= 6200 kg

Beban mati (DL)


- Beban kolom lantai 03 + 02 + konsol : 0.3 x 0.3 x 3.5 x 2400 + 3456.0 = 4212 kg
- Beban plat atap : 0.12 x 5 x 4 x 2400 = 5760 kg
- Berat balok (lantai 03 + atap) :
- arah x (memanjang) : 2 ( 0.2 x 0.3 x 5 - 0.2 x 2400 ) = 1382.4 kg
- arah y (melintang) : 2 ( 0.2 x 0.3 x 4 x 2400 ) = 1152 kg
- Berat finishing atap : 5 x 4 x 63 = 1260 kg
- Berat plafond + ducling (lantai 03 + atap) : 2 x 5 x 4 x 20 = 800 kg
- Berat dinding lantai 03 : 0.2 x 3.5 - 0.3 ( 5 - 0.3 ) 250 = 752 kg
0.2 x 3.5 - 0.3 ( 4 - 0.3 ) 250 = 592 kg
= 15910.4 kg

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Menurut SNI 2847:2013 Pasal 9.2.1, kuat perlu (U) yang menahan beban mati (D) dan beban hidup (L)
paling tidak harus sama dengan :
U = 1.2 DL + 1.6 LL sehingga :
= 1.2 x 15910.4 + 1.6 x 6200 = 29012.48 kg
Pu = U x 9.81 = x
29012.48 9.81 = 284612.43 N
Menurut SNI 2847:2013 Pasal 10.3.6.1, kuat tekan rancang komponen struktur tidak boleh lebih besar dari :

ΦPnmax = 0.85 x Φ x 0.85 x f 'c x Ag - Ast + fy x Ast


dimana :
f = Faktor reduksi f = 0,75 untuk aksial tekan dengan aksial lentur komponen struktur
dengan tulangan sengkang biasa, SNI 1991 Pasal 3.2.3.2.2.b
f 'c = Kuat tekan beton yang disyaratkan = 25 MPa
fy = Tegangan leleh baja yang disyaratkan = 240 MPa
Ag = Luas bruto penampang = 300 x 300 = 90000 mm2
rt = Rasio penulangan kolom (0,01 - 0,03), diambil rt = 0,02
Ast = Luas tulangan total = rt . Ag = 0.02 x 90000 = 1800 mm2
Sehingga :
ΦPnmax = 0.85 x 0.75 x 0.85 x 25 x 90000 - 1800 + 240 x 1800
= 1470234.38 N
Syarat :
ΦPnmax > Pu
1470234.38 > 284612.43 Aman !!
Kesimpulan : Dari analisa diatas didapat ukuran kolom yang direncanakan adalah 30 x 30 cm2

I.2.2 Tinjau Kolom Tepi

2.5 m 2.5 m

4m

4m

2m

5m 5m

Beban yang dipikul menurut SNI 1727:2013 Tabel 4-1 untuk gedung :
- Berat volume beton bertulang = 2400 kg/m3
- Panjang kolom = 4 + 3.5 = 7.5 m
- Berat beban hidup untuk gedung Ruko = 200 kg/m3
- Beban hidup untuk plat atap = 100 kg/m3
- Berat volume air = 1000 kg/m3
- Berat plafond + duching = 20 kg/m2
- Finishing plat atap (2 cm) = 63 kg/m2
- Finishing plat lantai (1 cm) = 42 kg/m2
- Total berat konsol (konstruksi kayu + atap genteng) sekeliling = 2700 kg
- Berat dinding pasangan batu 1/2 batu = 250 kg/m2

Pembebanan yang bekerja hanya pembebanan gravitasi saja, tanpa beban gempa yang terjadi
yang terdiri dari :
1. Beban mati (DL)
2. Beban hidup (LL)

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

A. Kolom pada lantai 3 ( Direncanakan dimensi ) 20 x 20 cm²

Beban hidup (LL)


- Beban hidup plat atap : 5 x 4 x 100 x 0.25 = 500 kg
- Beban air pada lantai atap (1 cm) : 5 x 4 x 0.01 x 1000 x 0.25 = 50 kg
= 550 kg

Beban mati (DL)


- Beban kolom lantai 3 + konsol : 0.2 x 0.2 x 3.5 x 2400 + 2700 = 3036 kg
- Beban plat atap : 0.12 x 5 x 4 x 2400 x 0.25 = 1440 kg
- Berat balok atap :
- arah x (memanjang) : 0.2 x 0.3 x (5.00 - 0.20) 2400 x 0.25 = 172.8 kg
- arah y (melintang) : 0.2 x 0.3 x 4 x 2400 x 0.25 = 144 kg
- Berat finishing atap : 5 x 4 x 63 x 0.25 = 315 kg
- Berat plafond + ducling : 5 x 4 x 20 x 0.25 = 100 kg
= 5207.8 kg

Menurut SNI 2847:2013 Pasal 9.2.1, kuat perlu (U) yang menahan beban mati (D) dan beban hidup (L)
paling tidak harus sama dengan :
U = 1.2 DL + 1.6 LL sehingga :
= 1.2 x 5207.8 + 1.6 x 550 = 7129.36 kg
Pu = U x 9.81 = 7129.36 x 9.81 = 69939.02 N
Menurut SNI 2847:2013 Pasal 10.3.6.1, kuat tekan rancang komponen struktur tidak boleh lebih besar dari :

ΦPnmax = 0.85 x Φ x 0.85 x f 'c x Ag - Ast + fy x Ast


dimana :
f = Faktor reduksi f = 0,65 untuk aksial tekan dengan aksial lentur komponen struktur
dengan tulangan sengkang biasa, SNI 1991 Pasal 3.2.3.2.2.b
f 'c = Kuat tekan beton yang disyaratkan = 25 MPa
fy = Tegangan leleh baja yang disyaratkan = 240 MPa
Ag = Luas bruto penampang = 200 x 200 = 40000 mm2
rt = Rasio penulangan kolom (0,01 - 0,03), diambil rt = 0,02
Ast = Luas tulangan total = rt . Ag = 0.02 x 40000 = 800 mm2
Sehingga :
ΦPnmax = 0.85 x 0.65 x 0.85 x 25 x 40000 - 800 + 240 x 800
= 566312.50 N
Syarat :
ΦPnmax > Pu
566312.50 > 69939.02 Aman !!

B. Kolom pada lantai 1 ( Direncanakan dimensi ) 20 x 20 cm²

Beban hidup (LL)


- Beban hidup plat atap : 5 x 4 x 100 x 0.25 = 500 kg
- Beban hidup lantai 03 : 5 x 4 x 200 x 0.25 = 1000 kg
- Beban air pada lantai atap (1 cm) : 5 x 4 x 0.01 x 1000 x 0.25 = 50 kg
= 1550 kg

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

Beban mati (DL)


- Beban kolom lantai 03 + 02 + konsol : 0.2 x 0.2 x 3.5 x 2400 + 3036 kg = 3372 kg
- Beban plat atap : 0.12 x 5 x 4 x 2400 x 0.25 = 1440 kg
- Berat balok (lantai 03 + atap)
- arah x (memanjang) : 2 ( 0.2 x 0.3 x 5 - 0.2 x 2400 ) 0.25 = 345.6 kg
- arah y (melintang) : 2 ( 0.2 x 0.3 x 4 x 2400 ) 0.25 = 288 kg
- Berat finishing atap : 5 x 4 x 63 x 0.25 = 315 kg
- Berat plafond + ducling (lantai 03 + atap) : 2 x 5 x 4 x 20 x 0.25 = 200 kg
- Berat dinding lantai 03 : 0.2 x 3.5 - 0.3 ( 5 - 0.2 ) 250 0.25 = 192 kg
0.2 x 3.5 - 0.3 ( 4 - 0.2 ) 250 0.25 = 152 kg
= 6304.6 kg

Menurut SNI 1991 Pasal 3.2.2.1, kuat perlu (U) yang menahan beban mati (D) dan beban hidup (L)
paling tidak harus sama dengan :
U = 1.2 DL + 1.6 LL sehingga :
= 1.2 x 6304.6 + 1.6 x 1550 = 10045.52 kg
Pu = U x 9.81 = 10045.52 x 9.81 = 98546.55 N
Menurut SNI 2847:2013 Pasal 10.3.6.1, kuat tekan rancang komponen struktur tidak boleh lebih besar dari :

ΦPnmax = 0.85 x Φ x 0.85 x f 'c x Ag - Ast + fy x Ast


dimana :
f = Faktor reduksi f = 0,65 untuk aksial tekan dengan aksial lentur komponen struktur
dengan tulangan sengkang biasa, SNI 1991 Pasal 3.2.3.2.2.b
f 'c = Kuat tekan beton yang disyaratkan = 25 MPa
fy = Tegangan leleh baja yang disyaratkan = 240 MPa
Ag = Luas bruto penampang = 200 x 200 = 40000 mm2
rt = Rasio penulangan kolom (0,01 - 0,03), diambil rt = 0,02
Ast = Luas tulangan total = rt . Ag = 0.02 x 40000 = 800 mm2
Sehingga :
ΦPnmax = 0.85 x 0.65 x 0.85 x 25 x 40000 - 800 + 240 x 800
= 566312.50 N
Syarat :
ΦPnmax > Pu
566312.50 > 98546.55 Aman !!
Kesimpulan : Dari analisa diatas didapat ukuran kolom yang direncanakan adalah 20 x 20 cm2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

I.2.3 Tinjau Kolom Tepi Tengah

2.5 m 2.5 m

4m

4m
2m

5m 5m

Beban yang dipikul menurut PBI untuk gedung 1983 hal. 11, 12 dan 17 :
- Berat volume beton bertulang = 2400 kg/m3
- Panjang kolom = 4 + 3.5 = 7.5 m
- Berat beban hidup untuk gedung Ruko = 200 kg/m3
- Beban hidup untuk plat atap = 100 kg/m3
- Berat volume air = 1000 kg/m3
- Berat plafond + duching = 20 kg/m2
- Finishing plat atap (3 cm) = 63 kg/m2
- Finishing plat lantai (2 cm) = 42 kg/m2
- Total berat konsol (konstruksi kayu + atap genteng) sekeliling = 2700 kg
- Berat dinding pasangan batu 1/2 batu = 250 kg/m2

Pembebanan yang bekerja hanya pembebanan gravitasi saja, tanpa beban gempa yang terjadi
yang terdiri dari :
1. Beban mati (DL)
2. Beban hidup (LL)
A. Kolom pada lantai 2 ( Direncanakan dimensi ) 25 x 25 cm²

Beban hidup (LL)


- Beban hidup plat atap : 5 x 4 x 100 x 0.5 = 1000 kg
- Beban air pada lantai atap (1 cm) : 5 x 4 x 0.01 x 1000 x 0.5 = 100 kg
= 1100 kg

Beban mati (DL)


- Beban kolom lantai 3 + konsol : 0.25 x 0.25 x 3.5 x 2400 + 2700 = 3225 kg
- Beban plat atap : 0.12 x 5 x 4 x 2400 x 0.5 = 2880 kg
- Berat balok atap
- arah x (memanjang) : 0.2 x 0.3 x (5.00 - 0.20) 2400 x 0.5 = 345.6 kg
- arah y (melintang) : 0.2 x 0.3 x 4 x 2400 x 0.5 = 288 kg
- Berat finishing atap : 5 x 4 x 63 x 0.5 = 630 kg
- Berat plafond + ducling : 5 x 4 x 20 x 0.5 = 200 kg
= 7568.6 kg

Menurut SNI 2847:2013 Pasal 9.2.1, kuat perlu (U) yang menahan beban mati (D) dan beban hidup (L)
paling tidak harus sama dengan :

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

U = 1.2 DL + 1.6 LL sehingga :


= 1.2 x 7568.6 + 1.6 x 1100 = 10842.32 kg
Pu = U x 9.81 = 10842.32 x 9.81 = 106363.16 N
Menurut SNI 2847:2013 Pasal 10.3.6.1, kuat tekan rancang komponen struktur tidak boleh lebih besar dari :

ΦPnmax = 0.85 x Φ x 0.85 x f 'c x Ag - Ast + fy x Ast


dimana :
f = Faktor reduksi f = 0,65 untuk aksial tekan dengan aksial lentur komponen struktur
dengan tulangan sengkang biasa, SNI 1991 Pasal 3.2.3.2.2.b
f 'c = Kuat tekan beton yang disyaratkan = 25 MPa
fy = Tegangan leleh baja yang disyaratkan = 240 MPa
Ag = Luas bruto penampang = 250 x 250 = 62500 mm2
rt = Rasio penulangan kolom (0,01 - 0,03), diambil rt = 0,02
Ast = Luas tulangan total = rt . Ag = 0.02 x 62500 = 1250 mm2
Sehingga :
ΦPnmax = 0.85 x 0.65 x 0.85 x 25 x 62500 - 1250 + 240 x 1250
= 884863.28 N
Syarat :
ΦPnmax > Pu
884863.28 > 106363.16 Aman !!

B. Kolom pada lantai 1 (Direncanakan dimensi 25 x 25 cm²

Beban hidup (LL)


- Beban hidup plat atap : 5 x 4 x 100 x 0.5 = 1000 kg
- Beban hidup lantai 03 : 5 x 4 x 200 x 0.5 = 2000 kg
- Beban air pada lantai atap (1 cm) : 5 x 4 x 0.01 x 1000 x 0.5 = 100 kg
= 3100 kg

Beban mati (DL)


- Beban kolom lantai 03 + 02 + konsol : 0.25 x 0.25 x 3.5 x 2400 + 3036 kg = 3561 kg
- Beban plat atap : 0.12 x 5 x 4 x 2400 x 0.5 = 2880 kg
- Berat balok (lantai 03 + atap)
- arah x (memanjang) : 2 ( 0.2 x 0.3 x 5 - 0.2 2400 ) 0.5 = 691.2 kg
- arah y (melintang) : 2 ( 0.2 x 0.3 x 4 x 2400 ) 0.5 = 576 kg
- Berat finishing atap : 5 x 4 x 63 x 0.5 = 630 kg
- Berat plafond + ducling (lantai 03 + atap) : 2 x 5 x 4 x 20 x 0.5 = 400 kg
- Berat dinding lantai 03 : 0.2 x 3.5 - 0.3 ( 5 - 0.25 ) 250 0.5 = 380 kg
0.2 x 3.5 - 0.3 ( 4 - 0.25 ) 250 0.5 = 300 kg
= 9418.2 kg

Menurut SNI 2847:2013 Pasal 9.2.1, kuat perlu (U) yang menahan beban mati (D) dan beban hidup (L)
paling tidak harus sama dengan :
U = 1.2 DL + 1.6 LL sehingga :
= 1.2 x 9418.2 + 1.6 x 3100 = 16261.84 kg
Pu = U x 9.81 = x
16261.84 9.81 = 159528.65 N
Menurut SNI 2847:2013 Pasal 10.3.6.1, kuat tekan rancang komponen struktur tidak boleh lebih besar dari :

ΦPnmax = 0.85 x Φ x 0.85 x f 'c x Ag - Ast + fy x Ast


dimana :
f = Faktor reduksi f = 0,65 untuk aksial tekan dengan aksial lentur komponen struktur
dengan tulangan sengkang biasa, SNI 1991 Pasal 3.2.3.2.2.b
f 'c = Kuat tekan beton yang disyaratkan = 25 MPa
fy = Tegangan leleh baja yang disyaratkan = 240 MPa
Ag = Luas bruto penampang = 250 x 250 = 62500 mm2
rt = Rasio penulangan kolom (0,01 - 0,03), diambil rt = 0,02
Ast = Luas tulangan total = rt . Ag = 0.02 x 62500 = 1250 mm2
Sehingga :
ΦPnmax = 0.85 x 0.65 x 0.85 x 25 x 62500 - 1250 + 240 x 1250
= 884863.28 N
Syarat :
ΦPnmax > Pu
884863.28 > 159528.65 Aman !!
Kesimpulan : Dari analisa diatas didapat ukuran kolom yang direncanakan adalah 25 x 25 cm²

Tabel Rekapitulasi Dimensi Kolom

KOLOM TEPI
LANTAI KOLOM TENGAH ( cm2 ) KOLOM TEPI ( cm2 )
TENGAH ( cm2 )

01 30 x 30 25 x 25 20 x 20
02 30 x 30 25 x 25 20 x 20

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


7030A0Concrete Building Structure

II. PERENCANAAN PENULANGAN PLAT

DENGAN METODE DDM (Direct Design Method)

II.1 Tebal Plat Lantai


Tebal plat lantai diperoleh dari perhitungan sebelumnya yaitu h 12 cm
II.2. Kontrol persyaratan untuk metode DDM
a. Banyaknya bentang untuk kedua arah ≥ 3 bentang, .............................Ok !!!
b. Perbandingan bentang panjang dengan bentang pendek
Ly Ly 500
< 2 = = 1.25 < 2 ................................Ok !!!
Lx Lx 400
c. Bentang - bentang yang berdekatan untuk masing - masing arah berselisih < 0,3 ................................Ok !!!
d. Penyimpangan letak kolom yang sebaris < 10 % bentang arah penyimpangan
0 < 10 % ...................................Ok !!!
e. Perbandingan antara beban hidup dan beban mati < 3
~ beban hidup (LL) = 200 kg/m2 ruang Ruko
~ beban mati (DL) = 0.12 x 2400 + 42 = 330 kg/m2
WLL WLL 200
< 3 = 0.606 < 3 ................................Ok !!!
WDL WDL 330
f. Sistem lantai tanpa balok a1 = 0, a2 = 0
Sistem lantai tanpa balok tepi b1 = 0
Karena panel dilengkapi dengan balok tepi pada keempat sisinya, maka kekakuan relatif
arah L2/L1 adalah :
a1 . L22 2.099 x 4 2
0.2 < < 5 0.2 < < 5
a2 . L12 1.679 x 5 2
0.2 < 0.8 < 5 ............................Ok !!!
II.3. Perhitungan momen statis berfaktor
qLL = 200 kg/m 2

qDL = 330 kg/m2


qu = 1.2 x qDL + = 1.6 x qLL 1.2 x 330 + 1.6 x 200
= 716.00 kg/m2
II.4. Momen statis total Mo dan Distribusi arah longitudinal (L 1 = 500 cm)
SNI 2847:2017 Pasal 13.6.2.2 Pers 13-4
1
Mo = x ( qu x L2 ) Ln12
8
1 2
Mo = x ( 716.00 x 4 ) 4.8 = 8248.320 kg.m
8
Ln1 = 4.8

25 x 25 30 x 30

0.16 Mo 0.7 Mo 0.65 Mo 0.65 Mo 0.7 Mo 0.16 Mo

0.57 Mo 0.35 Mo 0.57 Mo


20 x 30

500 cm 500 cm 500 cm

0.7 Mo 0.65 Mo 0.65 Mo 0.7 Mo

0.16 Mo 0.16 Mo
- - - - - -

+ + +
0.57 Mo 0.35 Mo 0.57 Mo

Koefisien distribusi longitudinal L1


~ Bentang tepi luar
M (-) luar = 0.16 Mo = 1319.7312 Mo kg.m
M (+) lapangan = 0.57 Mo = 4701.542 kg.m
M (-) dalam = 0.7 Mo = 5773.824 kg.m
~ Bentang tengah dalam
M (-) tepi kiri = 0.65 Mo = 5361.408 kg.m
M (+) lapangan = 0.35 Mo = 2886.912 kg.m
M (-) tepi kanan = 0.65 Mo = 5361.408 kg.m
II.5. Distribusi Arah Transversal
~ Momen negatif dalam berfaktor
a1 . L2 2.099 x 4
= = 1.679 > 1
L1 5
L2 4
= = 0.8
L1 5

FF0000GABRIEL ARDIANTO P. FF000020160611014070


7030A0Concrete Building Structure

Tabel % M(-) dalam dipikul jalur kolom. SNI 2847:2013 Pasal 13.6.4.1

L2
0.5 1.0 2.0 Keterangan
L1
a1 . L2
= 0 75 75 75 Tanpa balok antara
L1
a1 . L2
> 1 90 75 45 Dengan Balok
L1

Dengan metode interpolasi diperoleh nilai Koefisien % M(-) dalam yang yang dipikul
jalur kolom
75 - 90 x - 90 -15 x - 90
= =
1 - 0.5 0.8 - 0.5 0.5 0.3
-4.5 = 0.5 x - 45
x = 81.00%
~ Momen positif berfaktor
a1 . L2 2.099 x 4
= = 1.679 > 1
L1 5
L2 4
= = 0.8
L1 5

Tabel % M(+) dipikul jalur kolom. SNI 2847:2013 Pasal 13.6.4.4

L2
0.5 1.0 2.0 Keterangan
L1
a1 . L2
= 0 60 60 60 Tanpa balok antara
L1
a1 . L2
> 1 90 75 45 Dengan Balok
L1
Dengan metode interpolasi diperoleh nilai Koefisien % M(+) dalam yang yang dipikul
jalur kolom
75 - 90 x - 90 -15 x - 90
= =
1 - 0.5 0.8 - 0.5 0.5 0.3
-4.5 = 0.5 x - 45
x = 81.00%
~ Momen negatif luar berfaktor
a1 . L2 2.099 x 4
= = 1.679 > 1
L1 5
L2 4 C
= = 0.8 bt =
L1 5 2 x Is

FF0000GABRIEL ARDIANTO P. FF000020160611014070


7030A0Concrete Building Structure

18 cm 38 cm

12 12

30 30
18 18

20 20

SNI 2847:2013 Pasal 13.6.4.2 Pers 13-6


x x 3 x y
C = S 1 - 0.63 x x
y 3
~ Kondisi 1
20 20 3 x 30 12 12 3 x 18
C = S 1 - 0.63 x x + 1 - 0.63 x x
30 3 18 3
= 46400 + 6013.440
= 52413.440 mm4
~ Kondisi 2
18 18 3 x 20 12 12 3 x 38
C = S 1 - 0.63 x x + 1 - 0.63 x x
20 3 18 3
= 16835.04 + 12695.04
= 29530.08 mm4
Gunakan nilai C yang terbesar
Dari perhitungan sebelumnya diperoleh Is = 28800 cm4
C 52413.44
bt = = = 0.910
2 x Is 2 x 28800

Tabel % M(+) dipikul jalur kolom. SNI 2847:2013 Pasal 13.6.4.2

L2
0.5 1.0 2.0 Keterangan
L1
a1 . L2
> 1 - - - Tanpa balok antara
L1
bt = 0 100 100 100 Tanpa Balok tepi
bt > 2.5 90 75 45 Dengan balok tepi
bt = ratio antara kekakuan puntir penampang balok tepi dan kekakuan lentur dari
suatu pelat dengan lebar yang sama dengan bentang balok dari sumbu ke
sumbu tumpuan.
Dengan metode interpolasi diperoleh nilai Koefisien % M(-) luar yang yang dipikul
jalur kolom
2.5 - 0.909956
= 90 + + 100 - 90 = 96.36%
2.5 - 0

FF0000GABRIEL ARDIANTO P. FF000020160611014070


7030A0Concrete Building Structure
Jalur kolom pada tiap sisi as kolom (yang terkecil dari 0,25 L1 atau 0,25 L2), sehingga lebar
satu jalur kolom = 2 (sisi) x 0,25L2 (terkecil)
= 2 x 0.25 x 400
= 200 cm
~ Bentang dalam :
M (-) kiri = 81.00% x 5361.41 = 4342.74048 kg.m
M (+) lapangan = 81.00% x 2886.912 = 2338.39872 kg.m
M (-) kanan = 81.00% x 5361.41 = 4342.74048 kg.m
~ Bentang tepi luar
M (-) tepi = 96.36% x 1319.73 = 1271.695331 kg.m
M (-) dalam = 81.00% x 5773.82 = 4676.79744 kg.m
M (+) lapangan = 81.00% x 4701.5424 = 3808.249344 kg.m
~ Jalur tengah : yaitu sisa bagian plat antara dua jaur kolom = t
t = 400 - 0.5 x 200 + 0.5 x 200 = 200 cm

0,25 L2 = 100 cm

200 cm

Bagian jalur kolom 0,25 L2 = 100 cm

400 cm jalur tengah = 200 cm

Bagian jalur kolom 0,25 L2 = 100 cm

500 cm 500 cm

~ Bentang dalam :
M (-) kiri = 5361.41 - 4342.74 = 1018.67 kg.m
M (+) lapangan = 2886.91 - 2338.40 = 548.51 kg.m
M (-) kanan = 5361.41 - 4342.74 = 1018.67 kg.m
~ Bentang tepi luar
M (-) tepi = 1319.73 - 1271.70 = 48.04 kg.m
M (-) dalam = 5773.82 - 4676.80 = 1097.03 kg.m
M (+) lapangan = 4701.54 - 3808.25 = 893.29 kg.m
KESIMPULAN MOMEN DESIGN
LOKASI JALUR KOLOM JALUR TENGAH
Bentang Tepi
M (-) tepi 1271.695 kg.m 48.036 kg.m
M (+) lapangan 3808.249 kg.m 893.293 kg.m
M (-) dalam 4676.797 kg.m 1097.027 kg.m
Bentang Dalam
M (-) tepi 4342.740 kg.m 1018.668 kg.m
M (+) lapangan 2338.399 kg.m 548.513 kg.m
M (-) dalam 4342.740 kg.m 1018.668 kg.m
II.6. Perhitungan Distribusi Momen Untuk :
Bentang = 400 cm sebagai arah utama (arah yang ditinjau) / longitudinal L1
Bentang = 500 cm sebagai arah transversal L2
II.6.1. Distribusi arah longitudinal / arah utama L1 = 400 cm
1
Mo = x ( qu x L1 ) Ln22
8
1 2
Mo = x ( 716.00 x 5 ) 3.80 = 6461.90 kg.m
8
~ Bentang tepi luar
M (-) luar = 0.16 Mo = 1033.904 kg.m
M (+) lapangan = 0.57 Mo = 3683.283 Mo kg.m
M (-) dalam = 0.7 Mo = 4523.33 kg.m
~ Bentang tengah dalam
M (-) tepi = 0.65 Mo = 4200.24 kg.m
M (+) lapangan = 0.35 Mo = 2261.67 kg.m

400 cm 400 cm 400 cm

4523.33 4200.235 4200.235 4523.33

1033.904 1033.904

- - - - - -
+ +

+
3683.283 2261.67 3683.283

II.6.2. Distribusi arah longitudinal / arah utama L2 = 500 cm


- Jalur kolom ( lebar = 200 cm)
~ Bentang dalam :
M (-) kiri = 81.00% x 4200.24 = 3402.19035 kg.m
M (+) lapangan = 81.00% x 2261.67 = 1831.94865 kg.m
M (-) kanan = 81.00% x 4200.24 = 3402.19035 kg.m
~ Bentang tepi luar
M (-) tepi = 96.36% x 1033.90 = 996.2717325 kg.m
M (-) dalam = 81.00% x 3683.28 = 2983.45923 kg.m
M (+) lapangan = 81.00% x 4523.33 = 3663.8973 kg.m
- Jalur tengah ( lebar = 500 - 200 = 300 cm)
~ Bentang dalam :
M (-) kiri = 4200.24 - 3402.19 = 798.04 kg.m
M (+) lapangan = 2261.67 - 1831.95 = 429.72 kg.m
M (-) kanan = 4200.24 - 3402.19 = 798.04 kg.m
~ Bentang tepi luar
M (-) tepi = 1033.90 - 996.27 = 37.63 kg.m
M (-) dalam = 3683.28 - 2983.46 = 699.82 kg.m
M (+) lapangan = 4523.33 - 3663.90 = 859.43 kg.m

400 cm 400 cm 400 cm

699.824 798.045 798.04465 699.824

37.632 37.632

- - - - - -
+ + +

859.433 429.716 859.433

KESIMPULAN MOMEN DESIGN


LOKASI JALUR KOLOM JALUR TENGAH

FF0000GABRIEL ARDIANTO P. FF000020160611014070


7030A0Concrete Building Structure
Bentang Tepi
M (-) tepi 996.2717 kg.m 37.6323 kg.m
M (+) lapangan 2983.4592 kg.m 699.8238 kg.m
M (-) dalam 3663.8973 kg.m 859.4327 kg.m
Bentang Dalam
M (-) tepi 3402.1904 kg.m 798.0447 kg.m
M (+) lapangan 1831.9487 kg.m 429.7164 kg.m
M (-) dalam 3402.1904 kg.m 798.0447 kg.m

II.7. Disain Tulangan


II.7.1 Disain Tulangan untuk lantai 02 dan 03
Digunakan beton dengan f 'c = 25 MPa dan besi fy = 240 MPa dengan menggunakan
Metode Kekuatan Versi CODE' 91 / SK SNI, maka tulangan dapat dihitung sebagai berikut :
Tulangan Lantai Bentang 500 cm' sebagai arah L1
# Jalur kolom lebar b = 200 cm'
Tinggi efektif d = h - d' h = tebal plat d' = tebal selimut diambil 3 cm
= 12 - 3
= 9
~ Bentang dalam
a. M (-) tepi kiri = 4342.740 kg.m = 434274.048 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 434274.048
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 542842.560 = 0
Dengan rumus ABC diperoleh : AS. = 27.505 cm2 pada lebar jalur kolom 200 cm
atau 13.75 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = D 22 - 14 = 27.152 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 27.15
rada = = = 0.030 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
b. M (+) lapangan = 233839.872 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 233839.872
AS 2
- 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.76470588 AS2 - 21600 AS. + 292299.840 = 0
Dengan rumus ABC diperoleh : AS. = 14.162 cm2 pada lebar jalur kolom 200 cm
atau 7.081 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = D 16 - 15 = 13.404 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 13.40
rada = = = 0.015 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 . f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
~ Bentang tepi jalur kolom
a. M (-) tepi kiri = 1271.6953 kg.m = 127169.533 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 127169.533
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.76470588 AS2 - 21600 AS. + 158961.916 = 0
Dengan rumus ABC diperoleh : AS. = 7.538 cm2 pada lebar jalur kolom 200 cm
atau 3.769 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = D 13 - 19 = 6.986 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 6.99
rada = = = 0.008 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
b. M (-)dalam = 4676.797 kg.m = 467679.744 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 467679.744
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.76470588 AS2 - 21600 AS. + 584599.680 = 0
Dengan rumus ABC diperoleh : AS. = 29.863 cm2 pada lebar jalur kolom 200 cm
atau 14.93 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = D 22 - 13 = 29.241 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 29.24
rada = = = 0.032 Ok !!!
b. d x100 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
c. M (+) lapangan = 3808.249 kg.m = 380824.934 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 380824.934
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 476031.168 = 0
Dengan rumus ABC diperoleh : AS. = 23.818 cm2 pada lebar jalur kolom 200 cm
atau 11.91 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = D 19 - 12 = 23.627 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 23.63
rada = = = 0.026 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85

FF0000GABRIEL ARDIANTO P. FF000020160611014070


7030A0Concrete Building Structure
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
~ Bentang dalam untuk jalur tengah
a. M (-) tepi kiri = 1018.668 kg.m = 101866.752 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 101866.752
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 127333.440 = 0
Dengan rumus ABC diperoleh : AS. = 6.008 cm2 pada lebar jalur kolom 200 cm
atau 3.004 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = Ø 12 - 19 = 5.952 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 5.95
rada = = = 0.006614 Ok !!!
b. d x 100
9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
b. M (+) lapangan = 54851.328 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 54851.328
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 68564.160 = 0
Dengan rumus ABC diperoleh : AS. = 3.207 cm2 pada lebar jalur kolom 200 cm
atau 1.603 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = Ø 13 - 25 = 5.309 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 5.31
rada = = = 0.006 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.0403181 Ok !!!
~ Bentang tepi jalur tengah
a. M (-) tepi kiri = 48.036 = 4803.587 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 4803.587
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS - 2
21600 AS. + 6004.484 = 0
Dengan rumus ABC diperoleh : AS. = 0.278 cm2 pada lebar jalur kolom 200 cm
atau 0.139 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = Ø 12 - 21 = 5.386 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 5.39
rada = = = 0.006 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
b. M (-)dalam = 1097.027 = 109702.656 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 109702.656
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 137128.320 = 0
Dengan rumus ABC diperoleh : AS. = 6.480 cm2 pada lebar jalur kolom 200 cm
atau 3.24 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = Ø 12 - 18 = 6.283 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 6.28
rada = = = 0.007 Ok !!!
b. d x 100
9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
c. M (+) lapangan = 893.293 kg.m = 89329.306 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 89329.306
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 111661.632 = 0
Dengan rumus ABC diperoleh : AS. = 5.256 cm2 pada lebar jalur kolom 200 cm
atau 2.628 cm2 per m' jalur kolom

Dipilih tulangan arah L1 = D 13 - 25 = 5.309 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 5.31
rada = = = 0.006 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
Kesimpulan hasil perhitungan tulangan arah bentang 500 cm' sebagai arah L1
LOKASI JALUR KOLOM JALUR TENGAH
Bentang Dalam
M (-) tepi D 22 - 14 Ø 12 - 19
M (+) lapangan D 16 - 15 D 13 - 25
M (-) dalam D 22 - 14 Ø 12 - 19
Bentang Tepi
M (-) tepi D 13 - 19 Ø 12 - 21
M (+) lapangan D 19 - 12 D 19 - 12
M (-) dalam D 22 - 13 D 22 - 13

Tulangan Lantai Bentang 400 cm' sebagai arah L2


# Jalur kolom lebar b = 200 cm'
Tinggi efektif d = h - d' h = tebal plat d' = tebal selimut diambil 3 cm

FF0000GABRIEL ARDIANTO P. FF000020160611014070


7030A0Concrete Building Structure
= 12 - 3
= 9
~ Bentang dalam
a. M (-) tepi kiri = 3402.190 kg.m = 340219.035 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 340219.035
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 425273.794 = 0
Dengan rumus ABC diperoleh : AS. = 21.083 cm2 pada lebar jalur kolom 200 cm
atau 10.54 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = D 19 - 14 = 20.252 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 20.25
rada = = = 0.023 Ok !!!
b. d x 100
9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
b. M (+) lapangan = 183194.865 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 183194.865
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 228993.581 = 0
Dengan rumus ABC diperoleh : AS. = 10.980 cm2 pada lebar jalur kolom 200 cm
atau 5.49 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = D 16 - 19 = 10.582 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 10.58
rada = = = 0.012 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
~ Bentang tepi jalur kolom
a. M (-) tepi kiri = 996.272 kg.m = 99627.1732451556 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 99627.173 kg.m
AS 2
- 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 kg.m AS - 2
21600 AS. + 124533.967 kg.m = 0
Dengan rumus ABC diperoleh : AS. = 5.874 cm2 pada lebar jalur kolom 200 cm
atau 2.937 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = D 10 - 14 = 5.610 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 5.61
rada = = = 0.006 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
b. M (-)dalam = 3663.897 kg.m = 366389.730 kg.m kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 366389.730 kg.m
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 kg.m AS2 - 21600 AS. + 457987.163 kg.m = 0
Dengan rumus ABC diperoleh : AS. = 22.840 cm2 pada lebar jalur kolom 200 cm
atau 11.42 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = D 22 - 17 = 22.361 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 22.36
rada = = = 0.025 Ok !!!
b. d x 100
9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
c. M (+) lapangan = 2983.459 = 298345.923 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 298345.923
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 372932.404 = 0
Dengan rumus ABC diperoleh : AS. = 18.318 cm2 pada lebar jalur kolom 200 cm
atau 9.159 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = D 16 - 11 = 18.278 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 18.28
rada = = = 0.020 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
~ Bentang dalam untuk jalur tengah
a. M (-) tepi kiri = 798.045 = 79804.465 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 79804.465
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 99755.581 = 0
Dengan rumus ABC diperoleh : AS. = 4.687 cm2 pada lebar jalur kolom 300 cm
atau 1.562 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = D 13 - 25 = 5.309 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240

FF0000GABRIEL ARDIANTO P. FF000020160611014070


7030A0Concrete Building Structure
As. 5.31
rada = = = 0.006 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
b. M (+) lapangan = 42971.635 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 42971.635
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 53714.544 = 0
Dengan rumus ABC diperoleh : AS. = 2.506 cm2 pada lebar jalur kolom 300 cm
atau 0.835 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = Ø 12 - 21 = 5.386 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 5.39
rada = = = 0.006 Ok !!!
b. d x
100 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
~ Bentang tepi jalur tengah
a. M (-) tepi kiri = 37.632 = 3763.227 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 3763.227
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 4704.033 = 0
Dengan rumus ABC diperoleh : AS. = 0.218 cm2 pada lebar jalur kolom 300 cm
atau 0.073 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = Ø 12 - 21 = 5.386 cm2


Kontrol
1.4 1.4
rmin = = = 0.0058
fy 240
As. 5.39
rada = = = 0.0060 Ok !!!
b. d x
100 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
b. M (-)dalam = 859.433 = 85943.2699999999 kg.cm
fy2
Mu
AS2 - fy . d. As + = 0
1,7 . fc' .b f
2400 2 85943.270
AS 2
- 2400 x 9 x As + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 As + 107429.088 = 0
Dengan rumus ABC diperoleh : As = 5.054 cm2 pada lebar jalur kolom 300 cm
atau 1.685 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = Ø 12 - 21 = 5.386 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 5.39
rada = = = 0.006 Ok !!!
b. d 100 x 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
c. M (+) lapangan = 699.824 = 69982.377 kg.cm
fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f
2400 2 69982.377
AS2 - 2400 x 9 x AS. + = 0
1.7 250 200 0.8
67.765 AS2 - 21600 AS. + 87477.971 = 0
Dengan rumus ABC diperoleh : AS. = 4.103 cm2 pada lebar jalur kolom 300 cm
atau 1.368 cm2 per m' jalur kolom

Dipilih tulangan arah L2 = D 13 - 25 = 5.309 cm2


Kontrol
1.4 1.4
rmin = = = 0.006
fy 240
As. 5.31
rada = = = 0.006 Ok !!!
b. d x
100 9
0.85 x f'c 600 0.85 .f'c 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040 Ok !!!
Kesimpulan hasil perhitungan tulangan arah bentang 400 cm' sebagai arah L2
LOKASI JALUR KOLOM JALUR TENGAH
Bentang Dalam
M (-) tepi D 19 - 14 D 13 - 25
M (+) lapangan D 16 - 19 Ø 12 - 21
M (-) dalam D 19 - 14 D 13 - 25
Bentang Tepi
M (-) tepi D 10 - 14 Ø 12 - 21
M (+) lapangan D 16 - 11 D 16 - 11
M (-) dalam D 22 - 17 D 22 - 17

FF0000GABRIEL ARDIANTO P. FF000020160611014070


Struktur Beton II

D 13 - 19 D 19 - 12 D 22 - 13

Ø 10 - 14 D 16 - 11 D 22 - 17

100 cm

Ø 12 - 21 D 19 - 12 D 22 - 13

400 cm
200 cm

Ø 12 - 21 D 16 - 11 D 22 - 17

100 cm

Ø 10 - 14 D 16 - 11 D 22 - 17

D 13 - 19 D 19 - 12 D 22 - 13

100 cm 300 cm 200 cm

SKETSA PENULANGAN LANTAI TEPI

D 22 - 14 D 16 - 15 D 22 - 14

D 19 - 14 D 16 - 19 D 19 - 14

100 cm

Ø 12 - 25 D 13 - 25 Ø 12 - 19

400 cm
200 cm

D 13 - 25 Ø 12 - 21 D 13 - 25

100 cm

D 19 - 14 D 16 - 19 D 19 - 14

D 22 - 14 D 16 - 15 D 22 - 14

100 cm 300 cm 200 cm

SKETSA PENULANGAN LANTAI TENGAH

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

III. ANALISA PEMBEBANAN PORTAL

Analisa pembebanan portal dilakukan terhadap kombinasi pembebanan berikut :


1. Beban Gravitasi (Beban mati + Beban hidup)
Beban - beban merata pada plat diterima oleh balok arah longitudinal dan arah transversal
(arah x dan y), seperti denah berikut. Disamping itu portal juga menerima beban garis berupa
berat sendiri balok dan berat dinding.

2m

2m

2m

2m
Portal
Eqivalen 1
Eqivalen 4

2m
Portal
Portal

Eqivalen 3
Portal
Portal 2m
Eqivalen 2

2m 2m 2m 2m 2m 2m
1m

1m

1m

2. Beban Gravitasi + Beban Gempa


Semua beban yang bekerja selebar portal dianggap dipikul sepenuhnya oleh portal yang
bersangkutan. Lebar portal yang dimaksud adalah jarak dari tengah bentang sebelah kiri
(jika ada) ke tengah bentang sebelah kanan. Hal ini didasarkan pada anggapan bahwa pada
saat percepatan gempa sejajar dengan sumbu x, maka semua beban - beban tersebut dipikul
oleh portal arah x. Demikian pula untuk arah y.
Luas pembebanan ditinjau dari denah berikut :
M N O P
2m

2m

I K L
J
2m

2m

E F G H
2m

2m

A B C D
2.5 m 2.5 m 2.5 m 2.5 m 2.5 m 2.5 m

A. Perhitungan beban akibat Gaya Gravitasi


Beban yang bekerja pada portal eqivalen 1 berbentuk sebagai berikut :

Luas trapesium = 2 x 0.5 x( 1 + 5 )x 2


2m

= 12.0
2m

Berat trapesium = 12 W
W = Berat persatuan luas

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Reaksi tumpuan = RA = RB
12 W
= = 6W
2

2m 2m 2m 2m

1m

1m
Momen maksimum terjadi tepat ditengah bentang, sebesar :
Mmaks = Ra . X - Q . ((1/3 a2 + 1/4 . B . (2a + b ))/(a + b)
Dimana : Q = Berat trapesium
a = tinggi trapesium
b = sisi atas trapesium
Jadi :
Mmaks = Ra . X - Q . ((1/3 a2 + 1/4 . B . (2a + b ))/(a + b)
1 1
6W x 2.5 - 12 W . x 2 2 + x 2 x 2 + 1
Mmaks = 3 4
2 + 1
= 4.6667 W
Sehingga bila diubah menjadi beban merata, koefisiennya menjadi :
1
4.6667 W = x Qeq x 5 2
8
Qeq = 1.49 W
1. Beban Gravitasi pada balok lantai atap
Beban mati (DL)
- Beban balok 0.2 x 0.3 x 2400 = 144 kg/m'
- Beban plat 0.12 x 1.49 x 2400 = 430.08 kg/m'
- Beban plafond + ducling 20 x 1.49 = ###
- Beban finishing atap 63 x 1.49 = 94.08 kg/m'
= ###
Beban hidup (LL)
- Beban hidup plat atap 100 x 1.49 = ###
- Beban air 0.01 x 1000 x 1.49 = ###
= ###
Jadi beban rencana (qu1)
qu1 = 1.2 DL + 1.6 LL
= 1.2 x 698.027 + 1.6 x 164.267 = 1100.459
2. Beban Gravitasi pada balok lantai 03
Beban mati (DL)
- Beban balok 0.2 x 0.3 x 2400 = 144 kg/m'
- Beban plat 0.12 x 1.49 x 2400 = 430.08 kg/m'
- Beban plafond + ducling 20 x 1.49 = ###
- Beban finishing lantai 03 42 x 1.49 = 62.72 kg/m'
- Beban dinding ( 3.5 - 0.3 ) x 250 = 800 kg/m'
= ###
Beban hidup (LL)
- Beban hidup lantai 03 200 x 1.49 = ###
Jadi beban rencana (qu1)
qu2 = 1.2 DL + 1.6 LL
= 1.2 x 1466.667 + 1.6 x 298.6667 = ###
3. Beban Gravitasi pada balok lantai 02
Beban mati (DL)
- Beban balok 0.2 x 0.3 x 2400 = 144 kg/m'
- Beban plat 0.12 x 1.49 x 2400 = 430.08 kg/m'
- Beban plafond + ducling 20 x 1.49 = ###
- Beban finishing lantai 03 42 x 1.49 = 62.72 kg/m'
- Beban dinding ( 3.5 - 0.3 ) x 250 = 800 kg/m'
= ###

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Beban hidup (LL)
- Beban hidup lantai 02 200 x 1.49 = ###
Jadi beban rencana (qu1)
qu2 = 1.2 DL + 1.6 LL
= 1.2x 1466.667 + 1.6 x 298.6667 = ###
B. Perhitungan beban akibat Gempa
1. Berat bangunan total
a. Berat atap (W3)
Beban mati (DL)
- Beban plat 15 x 12 x 0.12 x 2400 = 51840 kg
- Beban balok
- arah x (memanjang) : 0.2 x 0.3 x 15 x 4 x 2400 = 8640 kg
- arah y (melintang) : 0.2 x 0.3 x 12 x 4 x 2400 = 6912 kg
- Beban kolom
- Kolom tepi 4 x 0.2 x 0.2 x 3.5 x 2400 = 1344 kg
- Kolom tepi tengah 8 x 0.25 x 0.25 x 3.5 x 2400 = 4200 kg
- Kolom tengah 4 x 0.3 x 0.3 x 3.5 x 2400 = 3024 kg
- Beban dinding ( 3.5 - 0.3 ) x 250 x 27 = 21600 kg
- Beban finishing atap 63 x 15 x 12 = 11340 kg
- Beban plafond + ducling 20 x 15 x 12 = 3600 kg
= 112500 kg
Beban hidup (LL)
- Beban hidup plat atap 100 x 15 x 12 = 18000 kg'
- Beban air 0.01 x 1000 x 15 x 12 = 1800 kg'
= 19800 kg'
Beban total W3 =
W3 = 1.2 DL + 1.6 LL
= 1.2 x 112500 + 1.6 x 19800 = 166680 kg
b. Berat lantai 03 (W2)
Beban mati (DL)
- Beban plat 15 x 12 x 0.12 x 2400 = 51840 kg
- Beban balok
- arah x (memanjang) : 0.2 x 0.3 x 15 x 4 x 2400 = 8640 kg
- arah y (melintang) : 0.2 x 0.3 x 12 x 4 x 2400 = 6912 kg
- Beban kolom
- Kolom tepi 4 x 0.2 x 0.2 x 3.5 x 2400 = 1344 kg
- Kolom tepi tengah 8 x 0.25 x 0.25 x 3.5 x 2400 = 4200 kg
- Kolom tengah 4 x 0.3 x 0.3 x
3.5 x 2400 = 3024 kg
- Beban dinding ( 3.5 - 0.3 ) x 250 x 27 = 21600 kg
- Beban finishing lantai 03 42 x 15 x 12 = 7560 kg
- Beban plafond + ducling 20 x 15 x 12 = 3600 kg
= 108720 kg
Beban hidup (LL)
- Beban hidup lantai 03 200 x 15 x 12 = 36000 kg'
Beban total W2 =
W2 = 1.2 DL + 1.6 LL
= 1.2 x 108720 + 1.6 x 36000 = 188064 kg
c. Berat lantai 02 (W1)
Beban mati (DL)
- Beban plat 15 x 12 x 0.12 x 2400 = 51840 kg
- Beban balok
- arah x (memanjang) : 0.2 x 0.3 x 15 x 4 x 2400 = 8640 kg
- arah y (melintang) : 0.2 x 0.3 x 12 x 4 x 2400 = 6912 kg
- Beban kolom
- Kolom tepi 4 x 0.2 x 0.2 x 3.5 x 2400 = 1344 kg
- Kolom tepi tengah 8 x 0.25 x 0.25 x 3.5 x 2400 = 4200 kg
- Kolom tengah 4 x 0.3 x 0.3 x 3.5 x 2400 = 3024 kg
- Beban dinding ( 3.5 - 0.3 ) x 250 x 27 = 21600 kg
- Beban finishing lantai 03 42 x 15 x 12 = 7560 kg
- Beban plafond + ducling 20 x 15 x 12 = 3600 kg
= 108720 kg
Beban hidup (LL)
- Beban hidup lantai 03 200 x 15 x 12 = 36000 kg'
Beban total W1 :
W1 = 1.2 DL + 1.6 LL
= 1.2 x 108720 + 1.6 x 36000 = 188064 kg

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

Jadi berat total (Wt) = W3 + W2 + W1


= 166680 + 188064 + 188064
= 542808
2. Waktu getar bangunan (T)
Dengan rumus empiris :
Tx = Ty = 0,06 H3/4 (H adalah tinggi bangunan total)
Jadi :
Tx = Ty = 0.06 x 10.50 3/4
= 0.350 detik
3. Koefisien gempa dasar
Cperaturan = C20 thn / (f1 . F2)
Dimana :
f1 = faktor kelebihan kekuatan struktur = 1,5
f2 = faktor kelebihan kekuatan statis tak tentu dalam plastis = 2
C20 thn = Respon spektra 20 thn untuk tiap zona yang didapat dari grafik
antara waktu getar

Grafik untuk Zona I Dari grafik disamping, diperoleh :


C20 thn = 0,13
Sehingga :
0.13 Cperaturan = 0,13 / (1,5 . 2)
= 0.0433
0.10
0.09
0.065 Struktur diatas tanah lunak
0.05
0.045 Struktur diatas tanah keras

0 1.0 2.0 3.0


0.35 (dt) Waktu getar alami (dt)
4. Faktor keutamaan I dan faktor jenis struktur K
Berdasarkan desain struktur rangka beton di daerah rawan gempa ( SK. SNI T - 15 1991
pasal 3.14) diperoleh faktor keutamaan I = 1,0 dan faktor jenis struktur K = 1,0 untuk
gedung perpustakaan yang mengguanakan struktur rangka beton.

5. Gaya geser horizontal total akibat gempa


Rumus : C = koefisien gempa dasar = ###
Vx = Vy = C . I . K . Wt I = faktor keutamaan = 1
= 0.043 x 1 x 1 x 542808 K = faktor jenis struktur = 1
= 23521.680 kg Wt = komb. Beban hidup & mati vertikal
= 542808
6. Distribusi gaya geser horizontal total
a. Arah x
H 10.50 wi . hi
= = 0.700 < 3 Fix = x Vx
B 15.00 S wi . hi
a. Arah y
H 10.50 wi . hi
= = 0.875 < 3 Fiy = x Vy
B 12.00 S wi . hi
Dimana : Fix = Gaya horizontal akibat gempa pada lantai ke-i arah x
Fiy = Gaya horizontal akibat gempa pada lantai ke-i arah y
hi = Tinggi lantai ke-i terhadap lantai dasar
Wi = Berat lantai ke-i
Vx = Gaya geser horizontal total akibat gempa arah x
Vy = Gaya geser horizontal total akibat gempa arah y
B = Panjang sisi bangunan dalam arah yang ditinjau

V hi Wi
Tingkat Wi . hi Fix,Fiy 1/4 Fi
(t) (m) (t)
atap 23.5217 10.50 166.680 1750.140 11.052 2.763
03 23.5217 7 188.064 kg 1316.448 8.313 2.078
02 23.5217 3.5 188.064 658.224 4.157 1.039
S 3724.812 23.522 5.880

Sehingga struktur yang akan dianalisa ada 3, yaitu :

q = 0.698 t/m

3 4 4' 3'

3.5 m

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
3.5 m
q = 1.467 t/m

2 5 5' 2'

3.5 m
q = 1.467 t/m

1 6 6' 1'

3.5 m

A B C D

5 m 5 m 5 m

SKETSA PEMBEBANAN AKIBAT BEBAN MATI

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
q = 0.164 t/m

3 4 4' 3'

3.5 m
q = 0.299 t/m

2 5 5' 2'

3.5 m
q = 0.299 t/m

1 6 6' 1'

3.5 m

A B C D

5 m 5 m 5 m

SKETSA PEMBEBANAN AKIBAT BEBAN HIDUP

2.763 ton
3 4 4' 3'

3.5

2.078 ton
2 5 5' 2'

3.5

1.039 ton
1 6 6' 1'

3.5

A B C D

5 m 5 m 5 m

SKETSA PEMBEBANAN AKIBAT BEBAN GEMPA

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

PERHITUNGAN MOMEN-MOMEN UJUNG (Metode Matriks)


1. Perhitungan Kekakuan Relatif Balok terhadap Kolom
Diketahui ukuran balok : ( 20 x 30 ) cm²
0.2 x ( 0.3 ) 3
Ib = = 4.50E-04 m4
12

Diketahui ukuran Kolom Tengah : ( 30 x 30 ) cm²


0.3 x ( 0.3 ) 3
Ik1 = = 6.75E-04 m4
12

Diketahui ukuran Kolom Tepi Tengah : ( 25 x 25 ) cm²


0.25 x ( 0.25 ) 3
Ik2 = = 3.26E-04 m4
12

Diketahui ukuran Kolom Tepi : ( 20 x 20 ) cm²


0.2 x ( 0.2 ) 3
Ik3 = = 1.33E-04 m4
12

Misalnya Ib = I , Kekakuan balok = EIb = EI


EIk1 6.75E-04
Kekakuan Kolom Tengah = = = 1.5000 EI
EIb 4.50E-04
EIk2 3.26E-04
Kekakuan Kolom Tengah Tepi = = = 0.7234 EI
EIb 4.50E-04
EIk3 1.33E-04
Kekakuan Kolom Tepi = = = 0.2963 EI
EIb 4.50E-04

2. Analisa Portal Tanpa Penggoyangan

q1

EI EI EI
0.7234
0.7234 EI 1.5000 EI 1.5000 EI EI 3.5 m
q2

EI EI EI

0.7234 EI 1.5000 EI 1.5000 EI 0.7234 3.5 m


EI
A B C D

5 m 5 m 5 m

Diketahui,
q1 = 0.6980 t/m q1 = 0.1643 t/m
Untuk beban mati : q2 = 1.4667 t/m Untuk beban hidup : q2 = 0.2987 t/m
q2 = 1.4667 t/m q2 = 0.2987 t/m

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

A. Menentukan Momen Primer

q1

Fo1 Fo2 Fo3 Fo4 Fo5 Fo6

3.5 m
q3

Fo7 Fo8 Fo9 Fo10 Fo11 Fo12

3.5 m

A B C D

5 m 5 m 5 m

a. Akibat Beban Mati


0.6980 x (5) 2
Fo1 = Fo3 = Fo5 = = -1.4542 tm
12
0.6980 x (5) 2
Fo2 = Fo4 = Fo6 = = 1.4542 tm
12
1.4667 x (5) 2
Fo7 = Fo9 = Fo11 = = -3.0556 tm
12
1.4667 x (5) 2
Fo8 = Fo10 = Fo12 = = 3.0556 tm
12
1.4667 x (5) 2
Fo13 = Fo15 = Fo17 = = -3.0556 tm
12
1.4667 x (5) 2
Fo14 = Fo16 = Fo18 = = 3.0556 tm
12

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
b. Akibat Beban Hidup
0.1643 x (5) 2
Fo1 = Fo3 = Fo5 = = -0.3422 tm
12
0.1643 x (5) 2
Fo2 = Fo4 = Fo6 = = 0.3422 tm
12
0.2987 x (5) 2
Fo7 = Fo9 = Fo11 = = -0.6222 tm
12
0.2987 x (5) 2
Fo8 = Fo10 = Fo12 = = 0.6222 tm
12
0.2987 x (5) 2
Fo13 = Fo15 = Fo17 = = -0.6222 tm
12
0.2987 x (5) 2
Fo14 = Fo16 = Fo18 = = 0.6222 tm
12

B. Menetukan Derajat Ketidakbebasan Kinematis

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

1 2 3 4

3.5 m

5 6 7 8

3.5 m

A B C D

5 m 5 m 5 m

Karena konstruksi simetris dan beban yang terjadi simetris maka struktur tidak mengalami
translasi sehingga jumlah derajat kinematis adalah 8

3.5 m

1 2 3 4 5 6

13 15 17 19
3.5 m
14 16 18 20
7 8 9 10 11 12

21 23 25 27
3.5 m
22 24 26 28
A B C D

5 m 5 m 5 m

Np = Jumlah Derajat Ketidaktentuan Kinematis = 8


Nf = Jumlah momen-momen batang = 28

C. Menentukan Matriks Beban [P] 8 x 1

a. Akibat Beban Mati


P1 = - ( -1.4542 ) = 1.4542 tm
P2 = - ( 1.4542 ) - 1.4542 = 0 tm
P3 = - ( 1.4542 ) - 1.4542 = 0 tm
P4 = - ( 1.4542 ) = -1.4542 tm
P5 = - ( -3.0556 ) = 3.0556 tm

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
P6 = - ( 3.0556 ) - 3.0556 = 0 tm
P7 = - ( 3.0556 ) - 3.0556 = 0 tm
P8 = - ( 3.0556 ) = -3.0556 tm
P9 = - ( -3.0556 ) = 3.0556 tm
P10 = - ( 3.0556 ) - 3.0556 = 0 tm
P11 = - ( 3.0556 ) - 3.0556 = 0 tm
P12 = - ( 3.0556 ) = -3.0556 tm

b. Akibat Beban Hidup


P1 = - ( -0.3422 ) = 0.3422 tm
P2 = - ( 0.3422 ) - 0.3422 = 0 tm
P3 = - ( 0.3422 ) - 0.3422 = 0 tm
P4 = - ( 0.3422 ) = -0.3422 tm
P5 = - ( -0.6222 ) = 0.6222 tm
P6 = - ( 0.6222 ) - 0.6222 = 0 tm
P7 = - ( 0.6222 ) - 0.6222 = 0 tm
P8 = - ( 0.6222 ) = -0.6222 tm
P9 = - ( -0.6222 ) = 0.6222 tm
P10 = - ( 0.6222 ) - 0.6222 = 0 tm
P11 = - ( 0.6222 ) - 0.6222 = 0 tm
P12 = - ( 0.6222 ) = -0.6222 tm

D. Menentukan Matriks Deformasi [B]


[B]NfxNp = [B]42x12

1 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0
0 0 0 0 0 0 1 0 0 0 0 0
0 0 0 0 0 0 1 0 0 0 0 0
0 0 0 0 0 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 1 0 0 0
0 0 0 0 0 0 0 0 0 1 0 0
0 0 0 0 0 0 0 0 0 1 0 0
0 0 0 0 0 0 0 0 0 0 1 0
0 0 0 0 0 0 0 0 0 0 1 0
0 0 0 0 0 0 0 0 0 0 0 1
1 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0
[B] = 0 1 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 1 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 1 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 1 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 1 0 0
0 0 0 0 0 0 1 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 1 0
0 0 0 0 0 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 1 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 1 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 1 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0

E. Menentukan Matriks Kekakuan batang [S]


[S]i = 4EI/L 2EI/L Untuk tiap elemen batang [S] 28 x 28

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
2EI/L 4EI/L

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
F. Menentukan Matriks Kekakuan Struktur [K]
[K] = [B]T . [S] . [B] [K] 8 x 8

G. Menghitung Matriks Deformasi Elemen Struktur [X]


a. Akibat Beban Mati b. Akibat Beban Hidup
[X] = [K] -1
x [P]beban mati [X] = [K]-1 x [P]beban hidup

H. Menghitung Momen Akhir [H]


[H] = [Fo] 28 x 1 + [S] . [B] . [X]

3. Analisa Portal Dengan Penggoyangan


2.762974 ton

3.5 m

2.078297 ton

3.5 m

1.039149 ton

3.5 m

A B C D

5 m 5 m 5 m

A. Menentukan Momen Primer


Karena gaya horizontal tepat bekerja pada titik buhul maka momen primer dari semua batang
adalah = 0
B. Menetukan Derajat Ketidakbebasan Kinematis

P 13 1 2 3 4

3.5 m

P 14 5 6 7 8

3.5 m

P 15 9 10 11 12

3.5 m

A B C D
5 m 5 m 5 m

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Karena konstruksi mendapat gaya horizontal maka terjadi penggoyangan.
Banyaknya translasi = 3 Banyaknya Rotasi = 12
Sehingga jumlah derajat ketidaktentuan kinematis struktur = 15

1 2 3 4 5 6

19 21 23 25
3.5 m
20 22 24 26
7 8 9 10 11 12

27 29 31 33
3.5 m
28 30 32 34
13 14 15 16 17 18

35 37 39 41
3.5 m
36 38 40 42
A B C D

5 m 5 m 5 m

Np = Jumlah Derajat Ketidaktentuan Kinematis = 15


Nf = Jumlah momen-momen batang = 42

P 13
0 0 0 0

0 0 0 0

Diagram Perpindahan akibat P13 = 1 satuan

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

0 0 0 0

0 0 0 0

P 14
### ### -31 ###

### ### ### ###

Diagram Perpindahan akibat P14 = 1 satuan

27 29 31 33

28 30 32 34

P 15
### ### ### -41

### ### ### ###

Diagram Perpindahan akibat P15 = 1 satuan

P13

F19 + F20 F21 + F22 F23 + F24 F25 + F26


H1 = H2 = H3 = H4 =
3.5 3.5 3.5 3.5

P14

F27 + F28 F29 + F30 F31 + F32 F33 + F34


H5 = H6 = H7 = H8=
3.5 3.5 3.5 3.5

P15

F35 + F36 F37+ F38 F39 + F40 F41 + F42


H9 = H10 = H11 = H12=

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
H9 = H10 = H11 = H12=
3.5 3.5 3.5 3.5
P13 = - H1 - H2 - H3 - H4
P14 = H1 + H2 + H3 + H4 - H5 - H6 - H7 - H8
P15 = H5 + H6 + H7 + H8 - H9 - H10 - H11 - H12

C. Menentukan Matriks Beban [P] ### x 1


P1 = 0
P2 = 0
P3 = 0
P4 = 0
P5 = 0
P6 = 0
P7 = 0
P8 = 0
P9 = 0
P10 = 0
P11 = 0
P12 = 0
P13 = 2.76297 ton
P14 = 2.0783 ton
P15 = 1.03915 ton

D. Menentukan Matriks Deformasi [B]


[B]NfxNp = [B]42x15

1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 1 0 0 0 0 0 0 0 0
0 0 0 0 0 0 1 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 1 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 1 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 1 0 0 0 0 0
0 0 0 0 0 0 0 0 0 1 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 1 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 -0.286 0.2857 0
0 0 0 0 1 0 0 0 0 0 0 0 -0.286 0.2857 0
[B] = 0 1 0 0 0 0 0 0 0 0 0 0 -0.286 0.2857 0
0 0 0 0 0 1 0 0 0 0 0 0 -0.286 0.2857 0
0 0 1 0 0 0 0 0 0 0 0 0 -0.286 0.2857 0
0 0 0 0 0 0 1 0 0 0 0 0 -0.286 0.2857 0
0 0 0 1 0 0 0 0 0 0 0 0 -0.286 0.2857 0
0 0 0 0 0 0 0 1 0 0 0 0 -0.286 0.2857 0
0 0 0 0 1 0 0 0 0 0 0 0 0 -0.286 0.2857
0 0 0 0 0 0 0 0 1 0 0 0 0 -0.286 0.2857
0 0 0 0 0 1 0 0 0 0 0 0 0 -0.286 0.2857
0 0 0 0 0 0 0 0 0 1 0 0 0 -0.286 0.2857
0 0 0 0 0 0 1 0 0 0 0 0 0 -0.286 0.2857
0 0 0 0 0 0 0 0 0 0 1 0 0 -0.286 0.2857
0 0 0 0 0 0 0 1 0 0 0 0 0 -0.286 0.2857
0 0 0 0 0 0 0 0 0 0 0 1 0 -0.286 0.2857
0 0 0 0 0 0 0 0 1 0 0 0 0 0 -0.286
0 0 0 0 0 0 0 0 0 0 0 0 0 0 -0.286
0 0 0 0 0 0 0 0 0 1 0 0 0 0 -0.286
0 0 0 0 0 0 0 0 0 0 0 0 0 0 -0.286
0 0 0 0 0 0 0 0 0 0 1 0 0 0 -0.286
0 0 0 0 0 0 0 0 0 0 0 0 0 0 -0.286

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
0 0 0 0 0 0 0 0 0 0 0 1 0 0 -0.286
0 0 0 0 0 0 0 0 0 0 0 0 0 0 -0.286

E. Menentukan Matriks Kekakuan batang [S]


[S]i = 4EI/L 2EI/L Untuk tiap elemen batang [S] 42 x 42
2EI/L 4EI/L (sama dengan tanpa penggoyangan)

F. Menentukan Matriks Kekakuan Struktur [K]


[K] = [B]T . [S] . [B] [K] 15 x 15

G. Menghitung Matriks Deformasi Elemen Struktur [X]


[X] = [K]-1 x [P]

H. Menghitung Momen Akhir [H]


[H] = [Fo] 42 x 1 + [S] . [B] . [X]

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

E. Matriks Kekakuan Batang [S]

0.800 0.400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.400 0.800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0.800 0.400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0.400 0.800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0.800 0.400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0.400 0.800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0.800 0.400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0.400 0.800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0.800 0.400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0.400 0.800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0.800 0.400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0.400 0.800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0.800 0.400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0.400 0.800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.800 0.400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.400 0.800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.800 0.400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.400 0.800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
[S] = 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.857 1.714 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.857 1.714 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.857 1.714 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.857 1.714 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.857 1.714 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.857 1.714 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.827 0.413
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827

Matriks Deformasi Tranpose [B]T

1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0
[B]T = 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.82672 0.413 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857143 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0.4 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.82672 0.41336 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0.41336 0.827 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0.857 1.714 0 0 0 0 0 0 1.714286 0.857143 0 0 0 0 0 0 0 0 0 0 0 0


[B] .[S] =
T
0 0 0 0 0 0 0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0.86 1.714286 0 0 0 0 0 0 1.714286 0.857 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0.4 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0.41336 0.82672 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0.857143 1.714286 0 0 0 0 0 0 1.714 0.857 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0.857143 1.714 0 0 0 0 0 0 1.714 0.857 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827 0 0 0 0 0 0 0.827 0.413

F. Matriks Kekakuan Struktur [K]

1.627 0.4 0 0 0.413 0 0 0 0 0 0 0 0.667 -0.089 0.012282 -0.00337 -0.12024 0.026 0 0.001377 0.021277 -0.00625 0.001 0

0.4 3.314286 0.4 0 0 0.857 0 0 0 0 0 0 -0.089 0.334 -0.0453 0.012282 0.026115 -0.062 0.014 -0.0045 -0.00625 0.011331 0 0.001

0 0.4 3.314286 0.4 0 0 0.857 0 0 0 0 0 0.012 -0.045 0.333939 -0.08875 -0.0045 0.014 -0.062 0.026115 0.0013 -0.00332 0.011 -0.006

0 0 0.4 1.62672 0 0 0 0.413 0 0 0 0 0 0.012 -0.08875 0.66711 0.001377 0 0.026 -0.12024 -0.00044 0.0013 -0.006 0.021

0.413 0 0 0 2.453 0.4 0 0 0.41336 0 0 0 -0.12 0.026 -0.0045 0.001377 0.44791 -0.043 0.005 -0.00106 -0.07769 0.013621 0 0

0 0.857143 0 0 0.4 5.029 0.4 0 0 0.857 0 0 0.026 -0.062 0.013578 -0.0045 -0.04277 0.221 -0.021 0.004578 0.013621 -0.03935 0.007 0
[K] = 0 0 0.857143 0 0 0.4 5.029 0.4 0 0 0.857 0
[K]-1 = 0 0.014 -0.06201 0.026115 0.004578 -0.021 0.221 -0.04277 -0.0019 0.006939 -0.039 0.014

0 0 0 0.41336 0 0 0.4 2.453 0 0 0 0.41336 0.001 0 0.026115 -0.12024 -0.00106 0.005 -0.043 0.44791 0.000489 -0.0019 0.014 -0.078

0 0 0 0 0.413 0 0 0 2.453439 0.4 0 0 0.021 -0.006 0.0013 -0.00044 -0.07769 0.014 0 0.000489 0.426634 -0.03652 0.003 0

0 0 0 0 0 0.857 0 0 0.4 5.029 0.4 0 -0.006 0.011 -0.00332 0.0013 0.013621 -0.039 0.007 -0.0019 -0.03652 0.209919 -0.018 0.003

0 0 0 0 0 0 0.857 0 0 0.4 5.029 0.4 0.001 0 0.011331 -0.00625 -0.0019 0.007 -0.039 0.013621 0.003278 -0.01814 0.21 -0.037

0 0 0 0 0 0 0 0.413 0 0 0.4 2.453439 0 0.001 -0.00625 0.021277 0.000489 0 0.014 -0.07769 -0.00062 0.003278 -0.037 0.427

Matriks Beban Mati [P]Beban Mati dan [P]Beban Hidup Matriks Deformasi Elemen Struktur

1.4542 0.3422 0.6698 #VALUE!

0 0 -0.0764 #VALUE!

0 0 0.0764 #VALUE!

-1.4542 -0.3422 -0.6698 #VALUE!

3.0556 0.6222 0.9561 #VALUE!

0 0 -0.0527 #VALUE!
[P]Beban Mati = [P]Beban Hidup = [X]Beban Mati = [X]Beban Hidup =
0 0 0.0527 #VALUE!
-3.0556 -0.6222 -0.9561 #VALUE!

3.0556 0.6222 1.0982 #VALUE!


0 0 -0.0851 #VALUE!

0 0 0.0851 #VALUE!
-3.0556 -0.6222 -1.0982 #VALUE!

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

Momen Primer

Momen Primer
Akibat Beban

Akibat Beban
Momen Akhir

Momen Akhir
Untuk Beban
Untuk Beban

untuk Beban
untuk Beban

[S].[B].[X]
[S].[B].[X]

Hidup

Hidup

Hidup
Mati

Mati

Mati
No.

No.
0.7743 0.1380 1 -1.4542 0.7743 -0.6799 1 -0.3422 0.1380 -0.2043

0.2763 0.0505 2 1.4542 0.2763 1.7305 2 0.3422 0.0505 0.3927

-0.0739 -0.0123 3 -1.4542 -0.0739 -1.5281 3 -0.3422 -0.0123 -0.3546

0.0739 0.0123 4 1.4542 0.0739 1.5281 4 0.3422 0.0123 0.3546

-0.2763 -0.0505 5 -1.4542 -0.2763 -1.7305 5 -0.3422 -0.0505 -0.3927

-0.7743 -0.1380 6 1.4542 -0.7743 0.6799 6 0.3422 -0.1380 0.2043

1.1479 0.2586 7 -3.0556 1.1479 -1.9076 7 -0.6222 0.2586 -0.3637

0.4743 0.1057 8 3.0556 0.4743 3.5298 8 0.6222 0.1057 0.7280

-0.0665 -0.0157 9 -3.0556 -0.0665 -3.1220 9 -0.6222 -0.0157 -0.6379

0.0665 0.0157 10 3.0556 0.0665 3.1220 10 0.6222 0.0157 0.6379

-0.4743 -0.1057 11 -3.0556 -0.4743 -3.5298 11 -0.6222 -0.1057 -0.7280

-1.1479 -0.2586 12 3.0556 -1.1479 1.9076 12 0.6222 -0.2586 0.3637

1.2670 0.2803 13 -3.0556 1.2670 -1.7885 13 -0.6222 0.2803 -0.3419

0.4955 0.1099 14 3.0556 0.4955 3.5510 14 0.6222 0.1099 0.7321

-0.0920 -0.0202 15 -3.0556 -0.0920 -3.1476 15 -0.6222 -0.0202 -0.6424

0.0920 0.0202 16 3.0556 0.0920 3.1476 16 0.6222 0.0202 0.6424

-0.4955 -0.1099 17 -3.0556 -0.4955 -3.5510 17 -0.6222 -0.1099 -0.7321

-1.2670 -0.2803 18 3.0556 -1.2670 1.7885 18 0.6222 -0.2803 0.3419

0.6630 0.1309 19 0 0.6630 0.6630 19 0 0.1309 0.1309

0.7464 0.1592 20 0 0.7464 0.7464 20 0 0.1592 0.1592

-0.2024 -0.0381 21 0 -0.2024 -0.2024 21 0 -0.0381 -0.0381


[S].[B].[X]beban mati = [S].[B].[X]beban hidup =
-0.1954 -0.0413 22 0 -0.1954 -0.1954 22 0 -0.0413 -0.0413

0.2024 0.0381 23 0 0.2024 0.2024 23 0 0.0381 0.0381

0.1954 0.0413 24 0 0.1954 0.1954 24 0 0.0413 0.0413

-0.6630 -0.1309 25 0 -0.6630 -0.6630 25 0 -0.1309 -0.1309

-0.7464 -0.1592 26 0 -0.7464 -0.7464 26 0 -0.1592 -0.1592

0.8627 0.1934 27 0 0.8627 0.8627 27 0 0.1934 0.1934

0.8957 0.1994 28 0 0.8957 0.8957 28 0 0.1994 0.1994

-0.2125 -0.0487 29 0 -0.2125 -0.2125 29 0 -0.0487 -0.0487

-0.2366 -0.0530 30 0 -0.2366 -0.2366 30 0 -0.0530 -0.0530

0.2125 0.0487 31 0 0.2125 0.2125 31 0 0.0487 0.0487

0.2366 0.0530 32 0 0.2366 0.2366 32 0 0.0530 0.0530

-0.8627 -0.1934 33 0 -0.8627 -0.8627 33 0 -0.1934 -0.1934

-0.8957 -0.1994 34 0 -0.8957 -0.8957 34 0 -0.1994 -0.1994

0.5943 0.1314 35 0 0.5943 0.5943 35 0 0.1314 0.1314

0.2972 0.0657 36 0 0.2972 0.2972 36 0 0.0657 0.0657

-0.1669 -0.0366 37 0 -0.1669 -0.1669 37 0 -0.0366 -0.0366

-0.0834 -0.0183 38 0 -0.0834 -0.0834 38 0 -0.0183 -0.0183

0.1669 0.0366 39 0 0.1669 0.1669 39 0 0.0366 0.0366

0.0834 0.0183 40 0 0.0834 0.0834 40 0 0.0183 0.0183

-0.5943 -0.1314 41 0 -0.5943 -0.5943 41 0 -0.1314 -0.1314

-0.2972 -0.0657 42 0 -0.2972 -0.2972 42 0 -0.0657 -0.0657

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

Akibat Beban Gempa


Matriks Deformasi Tranpose [B]T

1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0
[B] =T 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -0.27778 -0.278 -0.278 -0.278 -0.278 -0.27778 -0.27778 -0.27778 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.277778 0.278 0.278 0.278 0.278 0.277778 0.277778 0.277778 -0.278 -0.278 -0.27778 -0.27778 -0.27778 -0.278 -0.278 -0.278 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.267 0.267 0.266667 0.266667 0.266667 0.267 0.267 0.267 -0.267 -0.267 -0.267 -0.267 -0.267 -0.267 -0.267 -0.267

0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.82672 0.413 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0


0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.714 0.857143 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0.4 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.82672 0.41336 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0.41336 0.827 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0.857 1.714 0 0 0 0 0 0 1.714286 0.857143 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0.86 1.714286 0 0 0 0 0 0 1.714286 0.857 0 0 0 0 0 0 0 0 0 0
[B] .[S] =
T 0 0 0 0 0 0 0 0 0 0 0.4 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0.41336 0.82672 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827 0 0 0 0 0 0 0.827 0.413 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0.857143 1.714286 0 0 0 0 0 0 1.714 0.857 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.8 0.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0.857143 1.714 0 0 0 0 0 0 1.714 0.857 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.413 0.827 0 0 0 0 0 0 0.827 0.413
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -0.34447 -0.344 -0.714 -0.714 -0.714 -0.71429 -0.34447 -0.34447 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.344466 0.344 0.714 0.714 0.714 0.714286 0.344466 0.344466 -0.344 -0.344 -0.71429 -0.71429 -0.71429 -0.714 -0.344 -0.344 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.331 0.331 0.685714 0.685714 0.685714 0.686 0.331 0.331 -0.331 -0.331 -0.686 -0.686 -0.686 -0.686 -0.331 -0.331

F. Matriks Kekakuan Struktur [K]

1.627 0.4 0 0 0.413 0 0 0 0 0 0 0 -0.344 0.3445 0 0.702 -0.053 0.048378 0.03176 -0.09237 0.054 0.024 0.02924 0.021617 -0.00597 0.002 0 0.277 0.036 0.004
0.4 3.314286 0.4 0 0 0.857 0 0 0 0 0 0 -0.714 0.7143 0 -0.053 0.371 -0.00821 0.048378 0.054628 -0.033 0.042 0.024011 -0.00598 0.01153 0 0.002 0.284 0.036 0.004
0 0.4 3.314286 0.4 0 0 0.857 0 0 0 0 0 -0.714 0.7143 0 0.048 -0.008 0.371029 -0.05265 0.024011 0.042 -0.033 0.054628 0.001563 -0.00312 0.012 -0.006 0.284 0.036 0.004
0 0 0.4 1.62672 0 0 0 0.413 0 0 0 0 -0.344 0.3445 0 0.032 0.048 -0.05265 0.70224 0.02924 0.024 0.054 -0.09237 -0.0001 0.001578 -0.006 0.022 0.277 0.036 0.004
0.413 0 0 0 2.453 0.4 0 0 0.41336 0 0 0 -0.344 -1E-17 0.331 -0.092 0.055 0.024011 0.02924 0.492814 0.003 0.05 0.043844 -0.0553 0.036306 0.021 0.023 0.458 0.24 0.026
0 0.857143 0 0 0.4 5.029 0.4 0 0 0.857 0 0 -0.714 3E-17 0.686 0.054 -0.033 0.042465 0.023728 0.002823 0.268 0.025 0.050167 0.036299 -0.01636 0.03 0.021 0.464 0.243 0.026
0 0 0.857143 0 0 0.4 5.029 0.4 0 0 0.857 0 -0.714 3E-17 0.686 0.024 0.042 -0.03312 0.054345 0.050167 0.025 0.268 0.002823 0.020776 0.029924 -0.016 0.036 0.464 0.243 0.026
[K] = 0 0 0 0.41336 0 0 0.4 2.453 0 0 0 0.41336 -0.344 -1E-17 0.331 [K]-1 = 0.029 0.024 0.054628 -0.09237 0.043844 0.05 0.003 0.492814 0.022872 0.020783 0.036 -0.055 0.458 0.24 0.026
0 0 0 0 0.413 0 0 0 2.453439 0.4 0 0 0 -0.344 -1E-17 0.022 -0.006 0.001563 -0.0001 -0.0553 0.036 0.021 0.022872 0.471136 0.008783 0.049 0.044 0.425 0.396 0.193
0 0 0 0 0 0.857 0 0 0.4 5.029 0.4 0 0 -0.714 0 -0.006 0.012 -0.00312 0.001578 0.036306 -0.016 0.03 0.020783 0.008783 0.256035 0.028 0.049 0.432 0.403 0.197
0 0 0 0 0 0 0.857 0 0 0.4 5.029 0.4 0 -0.714 0 0.002 0 0.01153 -0.00597 0.020783 0.03 -0.016 0.036306 0.048581 0.027975 0.256 0.009 0.432 0.403 0.197
0 0 0 0 0 0 0 0.413 0 0 0.4 2.453439 0 -0.344 -1E-17 0 0.002 -0.00598 0.021617 0.022872 0.021 0.036 -0.0553 0.043886 0.048581 0.009 0.471 0.425 0.396 0.193
-0.344 -0.71429 -0.71429 -0.34447 -0.344 -0.714 -0.714 -0.344 0 0 0 0 1.176 -1.176 0 0.277 0.284 0.28407 0.277435 0.45823 0.464 0.464 0.45823 0.425208 0.432207 0.432 0.425 6.27 4.08 1.692
0.344 0.714286 0.714286 0.344466 0 0 0 0 -0.34447 -0.714 -0.714 -0.34447 -1.176 2.3528 -1.129 0.036 0.036 0.036322 0.036186 0.239652 0.243 0.243 0.239652 0.396434 0.403437 0.403 0.396 4.08 3.58 1.638
0 0 0 0 0.331 0.686 0.686 0.331 0 0 0 0 0 -1.129 2.168 0.004 0.004 0.00397 0.003786 0.026216 0.026 0.026 0.026216 0.193372 0.197129 0.197 0.193 1.692 1.638 1.29

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

Matriks Beban Gempa [P]Gempa

[B].[S].[X] untuk
Momen Primer

Beban Gempa
Akibat Beban

Momen Akhir
Untuk Beban
Gempa

Gempa
No.
0

0 1.0223 1 0 1.0223 1.0223

0 1.0299 2 0 1.0299 1.0299

0 1.0374 3 0 1.0374 1.0374

0 1.0374 4 0 1.0374 1.0374

0 1.0299 5 0 1.0299 1.0299

0 1.0223 6 0 1.0223 1.0223

[P]beban Gempa = 0 2.1592 7 0 2.1592 2.1592

0 2.1687 8 0 2.1687 2.1687

0 2.1783 9 0 2.1783 2.1783

0 2.1783 10 0 2.1783 2.1783

0 2.1687 11 0 2.1687 2.1687

2.7630 2.1592 12 0 2.1592 2.1592

2.0783 2.6547 13 0 2.6547 2.6547

1.0391 2.6699 14 0 2.6699 2.6699

2.6850 15 0 2.6850 2.6850

2.6850 16 0 2.6850 2.6850

2.6699 17 0 2.6699 2.6699


Matriks Deformasi Elemen Struktur 2.6547 18 0 2.6547 2.6547

-1.0223 19 0 -1.0223 -1.0223

0.8457 -0.6314 20 0 -0.6314 -0.6314

0.8645 -2.0673 21 0 -2.0673 -2.0673


[S].[B].[X]beban gempa =
0.8645 -1.2523 22 0 -1.2523 -1.2523

0.8457 -2.0673 23 0 -2.0673 -2.0673

1.7914 -1.2523 24 0 -1.2523 -1.2523

1.8152 -1.0223 25 0 -1.0223 -1.0223

1.8152 -0.6314 26 0 -0.6314 -0.6314

[X]Beban Gempa = 1.7914 -1.5278 27 0 -1.5278 -1.5278

2.1997 -1.3590 28 0 -1.3590 -1.3590

2.2375 -3.0947 29 0 -3.0947 -3.0947

2.2375 -2.7328 30 0 -2.7328 -2.7328

2.1997 -3.0947 31 0 -3.0947 -3.0947

27.5622 -2.7328 32 0 -2.7328 -2.7328

20.4150 -1.5278 33 0 -1.5278 -1.5278

9.4175 -1.3590 34 0 -1.3590 -1.3590

-1.2957 35 0 -1.2957 -1.2957

-2.2050 36 0 -2.2050 -2.2050

-2.6221 37 0 -2.6221 -2.6221

-4.5399 38 0 -4.5399 -4.5399

-2.6221 39 0 -2.6221 -2.6221

-4.5399 40 0 -4.5399 -4.5399

-1.2957 41 0 -1.2957 -1.2957

-2.2050 42 0 -2.2050 -2.2050

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

TABEL KOMBINASI PEMBEBANAN YANG BEKERJA


2.263 2.709 2.24 2.267 2.705 2.316
Pembebanan Pada Struktur Kombinasi Pemb
Joint Batang Md Ml Mekiri Mekanan 1,2 Md+1,6 M0,9 (M + Meki)
l d
1-A 1950 539 -2007 2007 3203 -51
1 1-6 -4979 -1411 -689 689 -8233 -5101
1-2 3029 872 2696 -2696 5030 5152
Reaksi Perletakan 4674 1319 -2904 2904 7719 1593
Momen Lapangan 311 866 -7949 7949 1759 -6875
2-1 2767 834 2416 -2416 4655 4665
2 2-5 -5093 -1468 -9230 9230 -8461 -12890
2-3 2326 634 6813 -6813 3806 8226
Reaksi Perletakan 5363 1574 1307 -1307 8954 6003
Momen Lapangan 1976 661 -5963 5963 3429 -3588
3-2 1981 418 8018 -8018 3046 8999
3
3-4 -1981 -418 -8018 8018 -3046 -8999
Reaksi Perletakan 1915 371 -2547 2547 2891 -568
Momen Lapangan 166 11 -14385 14385 216 -12797
4-3 3086 566 20752 -20752 4608 21454
4 4-5 -240 -40 -4726 4726 -353 -4470
4-4' -2846 -525 -16026 16026 -4256 -16984
Reaksi Perletakan 2136 400 6410 -6410 3204 7692
Momen Lapangan 2670 500 0 0 4005 2403
5-4 -238 -64 -3549 3549 -388 -3408
5-2 7028 2073 21897 -21897 11750 26032
5
5-6 -283 -91 -4895 4895 -485 -4660
5-5' -6508 -1918 -13453 13453 -10877 -17965
Reaksi Perletakan 4950 1455 5381 -5381 8268 9298
Momen Lapangan 6187 1819 0 0 10335 5569
6-5 -344 -100 -4445 4445 -573 -4311
6-1 7422 2090 15209 -15209 12250 20368
6
6-B -241 -65 -6138 6138 -392 -5741
6-6' -6837 -1925 -4626 4626 -11284 -10316
Reaksi Perletakan 5162 1455 1850 -1850 8523 6311
Momen Lapangan 6453 1819 0 0 10654 5808

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

MBEBANAN YANG BEKERJA PADA STRUKTUR

Kombinasi Pembebanan pada Struktur


0,9 (Md + Meka)1,05 (Md+0,6Ml+Meki
1,05 (Md+0,6Ml+Meka
3561 280 4494
-3860 -6841 -5393
300 6560 899
6820 2690 8788
7434 -7475 9219
316 5968 894
3723 -15964 3418
-4038 9996 -4312
3651 7995 5251
7145 -3769 8752
-5434 10762 -6076
5434 -10762 6076
4016 -430 4918
13096 -14924 15285
-15899 25386 -18193
4037 -5240 4685
11862 -20146 13508
-3847 9226 -4236
2403 3119 3119
2980 -4016 3436
-13382 31677 -14307
4151 -5494 4786
6251 -22167 6085
-388 11764 464
5569 7643 7643
3691 -5092 4243
-7009 25079 -6860
5308 -6738 6151
-1990 -13248 -3534
2981 8280 4394
5808 7921 7921

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

TABEL KOMBINASI PEMBEBANAN YANG BEKERJA PADA STRUKTUR

Pembebanan Pada Struktur Kombinasi Pembebanan pada Struktur


Joint Batang
Md Ml Mekiri Mekanan 1,2 Md+1,6 Ml 0,9 (Md + Meki) 0,9 (Md + Meka) 1,05 (Md+0,6Ml+Meki) 1,05 (Md+0,6Ml+Meka)
M-19 0.6630 0.1309 -1.0223 1.0223 1.0051 -0.3234 1.5168 -0.2948 1.8521
1
M-1 -0.6799 -0.2043 1.0223 -1.0223 -1.1427 0.3082 -1.5321 0.2308 -1.9161
Reaksi R1-2 1.5350 0.3730 -0.4104 0.4104 2.4387 1.0121 1.7509 1.4157 2.2776
Momen Lapangan 2.7382 0.6119 0 0 4.2649 2.4644 2.4644 3.2606 3.2606
M-2 1.7305 0.3927 1.0299 -1.0299 2.7049 2.4843 0.6306 3.1458 0.9831
2 M-21 -0.2024 -0.0381 -2.0673 2.0673 -0.3039 -2.0427 1.6784 -2.4072 1.9341
M-3 -1.5281 -0.3546 1.0374 -1.0374 -2.4010 -0.4417 -2.3090 -0.7386 -2.9172
Reaksi R2-1 1.9552 0.4484 0.4104 -0.4104 3.0636 2.1291 1.3903 2.7664 1.9044
Reaksi R2-3 1.7451 0.4107 -0.4150 0.4150 2.7511 1.1971 1.9440 1.6553 2.5267
Momen Lapangan 2.1813 0.5133 0 0 3.4389 1.9632 1.9632 2.6138 2.6138
M-4 1.5281 0.3546 1.0374 -1.0374 2.4010 2.3090 0.4417 2.9172 0.7386
3 M-23 0.2024 0.0381 -2.0673 2.0673 0.3039 -1.6784 2.0427 -1.9341 2.4072
M-5 -1.7305 -0.3927 1.0299 -1.0299 -2.7049 -0.6306 -2.4843 -0.9831 -3.1458
Reaksi R3-2 1.7451 0.4107 0.4150 -0.4150 2.7511 1.9440 1.1971 2.5267 1.6553
Reaksi R3-4 1.9552 0.4484 -0.4104 0.4104 3.0636 1.3903 2.1291 1.9044 2.7664
Momen Lapangan 2.7382 0.6119 0 0 4.2649 2.4644 2.4644 3.2606 3.2606
M-6 0.6799 0.2043 1.0223 -1.0223 1.1427 1.5321 -0.3082 1.9161 -0.2308
4
M-25 -0.6630 -0.1309 -1.0223 1.0223 -1.0051 -1.5168 0.3234 -1.8521 0.2948
Reaksi R4-3 1.5350 0.3730 0.4104 -0.4104 2.4387 1.7509 1.0121 2.2776 1.4157
M-20 0.7464 0.1592 -0.6314 0.6314 1.1503 0.1035 1.2400 0.2210 1.5470
5 M-27 0.8627 0.1934 -1.5278 1.5278 1.3447 -0.5985 2.1515 -0.5765 2.6319
M7 -1.9076 -0.3637 2.1592 -2.1592 -2.8710 0.2264 -3.6602 0.0350 -4.4993
Reaksi R5-6 3.3422 0.6738 -0.8656 0.8656 5.0888 2.2290 3.7870 3.0250 4.8427
Momen Lapangan 5.4303 1.1244 0 0 8.3154 4.8873 4.8873 6.4102 6.4102
M-22 -0.1954 -0.0413 -1.2523 1.2523 -0.3005 -1.3029 0.9513 -1.5461 1.0838
M-8 3.5298 0.7280 2.1687 -2.1687 5.4005 5.1287 1.2250 6.4421 1.8877
6
M-29 -0.2125 -0.0487 -3.0947 3.0947 -0.3329 -2.9765 2.5940 -3.5032 2.9957
M-9 -3.1220 -0.6379 2.1783 -2.1783 -4.7671 -0.8493 -4.7703 -1.3928 -5.9672
Reaksi R6-5 3.9911 0.8195 0.8656 -0.8656 6.1006 4.3710 2.8130 5.6158 3.7981
Reaksi R6-7 3.6667 0.7467 -0.8713 0.8713 5.5947 2.5158 4.0842 3.4055 5.2353
Momen Lapangan 4.5833 0.9333 0 0 6.9933 4.1250 4.1250 5.4005 5.4005
M-24 0.1954 0.0413 -1.2523 1.2523 0.3005 -0.9513 1.3029 -1.0838 1.5461
M-10 3.1220 0.6379 2.1783 -2.1783 4.7671 4.7703 0.8493 5.9672 1.3928
7
M-31 0.2125 0.0487 -3.0947 3.0947 0.3329 -2.5940 2.9765 -2.9957 3.5032
M-11 -3.5298 -0.7280 2.1687 -2.1687 -5.4005 -1.2250 -5.1287 -1.8877 -6.4421
Reaksi R7-6 3.6667 0.7467 0.8713 -0.8713 5.5947 4.0842 2.5158 5.2353 3.4055
Reaksi R7-8 3.9911 0.8195 -0.8656 0.8656 6.1006 2.8130 4.3710 3.7981 5.6158
Momen Lapangan 5.4303 1.1244 0 0 8.3154 4.8873 4.8873 6.4102 6.4102
M-26 -0.7464 -0.1592 -0.6314 0.6314 -1.1503 -1.2400 -0.1035 -1.5470 -0.2210
8 M-12 1.9076 0.3637 2.1592 -2.1592 2.8710 3.6602 -0.2264 4.4993 -0.0350
M-33 -0.8627 -0.1934 -1.5278 1.5278 -1.3447 -2.1515 0.5985 -2.6319 0.5765
Reaksi R8-7 3.3422 0.6738 0.8656 -0.8656 5.0888 3.7870 2.2290 4.8427 3.0250
M-28 0.8957 0.1994 -1.3590 1.3590 1.3938 -0.4170 2.0292 -0.3609 2.4930
9 M-35 0.5943 0.1314 -1.2957 1.2957 0.9235 -0.6313 1.7011 -0.6537 2.0674
M-13 -1.7885 -0.3419 2.6547 -2.6547 -2.6933 0.7796 -3.9990 0.6941 -4.8808
Reaksi R9-10 3.3142 0.6686 -1.0649 1.0649 5.0468 2.0243 3.9412 2.7829 5.0193
Momen Lapangan 5.5069 1.1386 0 0 8.4301 4.9563 4.9563 6.4996 6.4996
M-30 -0.2366 -0.0530 -2.7328 2.7328 -0.3687 -2.6725 2.2466 -3.1513 2.5876
M-14 3.5510 0.7321 2.6699 -2.6699 5.4326 5.5988 0.7931 6.9932 1.3864
10
M-37 -0.1669 -0.0366 -2.6221 2.6221 -0.2589 -2.5100 2.2097 -2.9515 2.5548
M-15 -3.1476 -0.6424 2.6850 -2.6850 -4.8050 -0.4163 -5.2493 -0.8904 -6.5289
Reaksi R10-9 4.0192 0.8247 1.0649 -1.0649 6.1425 4.5757 2.6588 5.8579 3.6215
Reaksi R10-11 3.6667 0.7467 -1.0740 1.0740 5.5947 2.3334 4.2666 3.1927 5.4481
Momen Lapangan 4.5833 0.9333 0 0 6.9933 4.1250 4.1250 5.4005 5.4005
M-32 0.2366 0.0530 -2.7328 2.7328 0.3687 -2.2466 2.6725 -2.5876 3.1513
M-16 3.1476 0.6424 2.6850 -2.6850 4.8050 5.2493 0.4163 6.5289 0.8904
11
M-39 0.1669 0.0366 -2.6221 2.6221 0.2589 -2.2097 2.5100 -2.5548 2.9515
M-17 -3.5510 -0.7321 2.6699 -2.6699 -5.4326 -0.7931 -5.5988 -1.3864 -6.9932
Reaksi R11-10 3.6667 0.7467 1.0740 -1.0740 5.5947 4.2666 2.3334 5.4481 3.1927
Reaksi R11-12 4.0192 0.8247 -1.0649 1.0649 6.1425 2.6588 4.5757 3.6215 5.8579
Momen Lapangan 5.5069 1.1386 0 0 8.4301 4.9563 4.9563 6.4996 6.4996
M-34 -0.8957 -0.1994 -1.3590 1.3590 -1.3938 -2.0292 0.4170 -2.4930 0.3609
12 M-18 1.7885 0.3419 2.6547 -2.6547 2.6933 3.9990 -0.7796 4.8808 -0.6941
M-41 -0.5943 -0.1314 -1.2957 1.2957 -0.9235 -1.7011 0.6313 -2.0674 0.6537
Reaksi R12-11 3.3142 0.6686 1.0649 -1.0649 5.0468 3.9412 2.0243 5.0193 2.7829

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

KEADAAN MAX DAN MIN

Momen Balok Momen Kolom Reaksi Perletakan


Joint Batang
Max Min Max Min Max Min
M-19 1.8521 -0.3234
1
M-1 0.3082 -1.9161
Reaksi R1-2 2.4387 1.0121
Momen Lapangan 4.2649 2.4644
M-2 3.1458 0.6306
2 M-21 1.9341 -2.4072
M-3 -0.4417 -2.9172
Reaksi R2-1 3.0636 1.3903
Reaksi R2-3 2.7511 1.1971
Momen Lapangan 3.4389 1.9632
M-4 2.9172 0.4417
3 M-23 2.4072 -1.9341
M-5 -0.6306 -3.1458
Reaksi R3-2 2.7511 1.1971
Reaksi R3-4 3.0636 1.3903
Momen Lapangan 4.2649 2.4644
M-6 1.9161 -0.3082
4
M-25 0.3234 -1.8521
Reaksi R4-3 2.4387 1.0121
M-20 1.5470 0.1035
5 M-27 2.6319 -0.5985
M7 0.2264 -4.4993
Reaksi R5-6 5.0888 2.2290
Momen Lapangan 8.3154 4.8873
M-22 1.0838 -1.5461
M-8 6.4421 1.2250
6
M-29 2.9957 -3.5032
M-9 -0.8493 -5.9672
Reaksi R6-5 6.1006 2.8130
Reaksi R6-7 5.5947 2.5158
Momen Lapangan 6.9933 4.1250
M-24 1.5461 -1.0838
M-10 5.9672 0.8493
7
M-31 3.5032 -2.9957
M-11 -1.2250 -6.4421
Reaksi R7-6 5.5947 2.5158
Reaksi R7-8 6.1006 2.8130
Momen Lapangan 8.3154 4.8873
M-26 -0.1035 -1.5470
8 M-12 4.4993 -0.2264
M-33 0.5985 -2.6319
Reaksi R8-7 5.0888 2.2290
M-28 2.4930 -0.4170
9 M-35 2.0674 -0.6537
M-13 0.7796 -4.8808
Reaksi R9-10 5.0468 2.0243
Momen Lapangan 8.4301 4.9563
M-30 2.5876 -3.1513
M-14 6.9932 0.7931
10
M-37 2.5548 -2.9515
M-15 -0.4163 -6.5289
Reaksi R10-9 6.1425 2.6588
Reaksi R10-11 5.5947 2.3334
Momen Lapangan 6.9933 4.1250
M-32 3.1513 -2.5876
M-16 6.5289 0.4163
11
M-39 2.9515 -2.5548
M-17 -0.7931 -6.9932
Reaksi R11-10 5.5947 2.3334
Reaksi R11-12 6.1425 2.6588
Momen Lapangan 8.4301 4.9563
M-34 0.4170 -2.4930
12 M-18 4.8808 -0.7796
M-41 0.6537 -2.0674
Reaksi R12-11 5.0468 2.0243

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

### ### ### ### ### ###


###

###
###

###
### ### ###
###

###
### ###
### ### ### ###
###

###
###

###
###

###
###
### ### ###
###

###
### ###
### ### ### ###
###

###
###

###
###

###
### ### ###
###

###

###

###
A B C D

Diagram Momen Pembebanan Kombinasi Maksimal (Momen Positif) dan Minimal (Momen Negatif)
Keterangan :
Untuk Balok : = Momen Positif = Momen Negatif

Untuk Kolom : = Momen Positif = Momen Negatif

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

### ### ###

### ### ###

### ### ###

### ###
###
### ### ###

### ### ###

A B C D

Diagram Lintang Pembebanan Kombinasi Maksimal (Lintang Positif) dan Minimal (Lintang Negatif)
Keterangan :
Untuk Balok : = LIntang Positif = LIntang Negatif

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

IV. PERENCANAAN PENULANGAN BALOK DAN KOLOM


A. PENULANGAN BALOK
1. Penulangan balok atap
a. Tulangan tumpuan luar
M (-) = 10.762 tm = 107624225.816 Nmm
380

120
d
300
Ø 8
d'
D 29
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 29 - 8 - 40
= 237.500 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 107624225.816
Mnperlu = = = 134530282.271 Nmm
Ø 0.8
t
Mnada = 0.85 x fc' x Be x t x d -
2
120
= 0.85 x 25 x 380 x 120 x 238 -
2
= 171997500
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 107624225.816
= 238 + 238 2 -
0.85 x 25 x 0.8 x 380
= 85.559
0,85 . F 'c . Be . a aktual 0.85 x 25 x 380 x 85.559
r = =
Bw . d . fy 200 x 238 x 240
= 0.061

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.061 x 200 x 237.5
= 2878.705 mm2
Digunakan Tulangan : 4 D 29 = 2643.143 mm2
b. Tulangan lapangan bentang luar
M (-) = 15.285 tm = 152853203.783 Nmm
560

120
d
300
Ø 8
d'
D 32
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 32 - 8 - 40
= 236.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 152853203.783
Mnperlu = = = 191066504.728 Nmm
Ø 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 236 -
2
= 251328000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 152853203.783
= 236 + 236 2 -
0.85 x 25 x 0.8 x 560
= 82.429
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 82.429
r = =
Bw . d . fy 200 x 236 x 240
= 0.087
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.087 x 200 x 236.0
= 4087.116 mm 2

Digunakan Tulangan : 5 D 32 = 4022.857 mm2


c. Tulangan tumpuan dalam kiri
M (-) = 25.386 tm = 253861464.754 Nmm

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

560

120
d
300
Ø 8
d'
D 36
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 36 - 8 - 40
= 234.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 253861464.754
Mnperlu = = = 317326830.942 Nmm
Ø 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 234 -
2
= 248472000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 253861464.754
= 234 + 234 2 -
0.85 x 25 x 0.8 x 560
= 196.267
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 196.267
r = =
Bw . d . fy 200 x 234 x 240
= 0.208
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.208 x 200 x 234.0
= 9731.585 mm2
Digunakan Tulangan : 8 D 36 = 8146.286 mm2
d. Tulangan dalam bagian kanan
M (-) = 20.146 tm = 201460940.793 Nmm
560

120
d
300
Ø 8
d'
D 32
200

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 32 - 8 - 40
= 236.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 201460940.793
Mnperlu = = = 251826175.991 Nmm
Ø 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 236 -
2
= 251328000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 201460940.793
= 236 + 236 2 -
0.85 x 25 x 0.8 x 560
= 120.3615
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 120.361
r = =
Bw . d . fy 200 x 236 x 240
= 0.126
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.126 x 200 x 236.0
= 5967.922 mm2
Digunakan Tulangan : 6 D 32 = 4827.429 mm2
e. Tulangan lapangan bagian dalam
M (-) = 4.005 tm = 40047213.333 Nmm
560

120
d
300
Ø 8
d'
D 22
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 22 - 8 - 40
= 241.000 mm
1.4 1.4
rmin = = = 0.005833
fy 240
Mu 40047213.333
Mnperlu = = = 50059016.667 Nmm
Ø 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 241 -
2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

= 258468000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 40047213.333
= 241 + 241 2 -
0.85 x 25 x 0.8 x 560
= 18.137
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 18.137
r = =
Bw . d . fy 200 x 241 x 240
= 0.019
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.019 x 200 x 241.0
= 899.315 mm2
Digunakan Tulangan : 2 D 22 = 760.571 mm2
2. Penulangan balok lantai 03
a. Tulangan tumpuan luar
M (-) = 15.964 tm = 159637009.393 Nmm
380

120
d
300
Ø 8
d'
D 32
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 32 - 8 - 40
= 236.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 159637009.393
Mnperlu = = = 199546261.741 Nmm
Ø 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 380 x 120 x 236 x
2
= 170544000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 159637009.393
= 236 + 236 2 -
0.85 x 25 x 0.8 x 380
= 156.799
0,85 . F 'c . Be . a aktual 0.85 x 25 x 380 x 156.7991
r = =
Bw . d . fy 200 x 236 x 240
= 0.112

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.112 x 200 x 236.0
= 5275.638 mm2
Digunakan Tulangan : 6 D 32 = 4827.429 mm2
b. Tulangan lapangan bentang luar
M (-) = 8.752 tm = 87523674.554 Nmm
560

120
d
300
Ø 8
d'
D 25
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 25 - 8 - 40
= 239.500 mm
1.4 1.4
rmin = = = 0.005833
fy 240
Mu 87523674.554
Mnperlu = = = 109404593.192 Nmm
Ø 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 240 -
2
= 256326000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 87523674.554
= 240 + 240 2 -
0.85 x 25 x 0.8 x 560
= 42.084 42.084389
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 42.084
r = =
Bw . d . fy 200 x 240 x 240
= 0.044
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.044 x 200 x 239.5
= 2086.684 mm2
Digunakan Tulangan : 4 D 25 = 1964.286 mm2
c. Tulangan tumpuan dalam kiri
M (-) = 14.307 tm = 143065668.106 Nmm
560

120
d
300
Ø 8
d'
D 32
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 32 - 8 - 40
= 236.000 mm
1.4 1.4
rmin = = = 0.006
R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026
Struktur Beton II

rmin = = = 0.006
fy 240
Mu 143065668.106
Mnperlu = = = 178832085.133 Nmm
Ø 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 236 -
2
= 251328000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 143065668.106
= 236 + 236 2 -
0.85 x 25 x 0.8 x 560
= 75.874 75.874
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 75.874
r = =
Bw . d . fy 200 x 236 x 240
= 0.080
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.080 x 200 x 236.0
= 3762.109 mm2
Digunakan Tulangan : 4 D 32 = 3218.286 mm2
d. Tulangan tumpuan dalam bagian kanan
M (-) = 22.167 tm = 221669358.530 Nmm
560

120
d
300
Ø 8
d'
D 22
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 22 - 8 - 40

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

= 241.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 221669358.530
Mnperlu = = = 277086698.162 Nmm
Ø 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 241 -
2
= 258468000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x fc' x Ø x Be
2 x 221669358.530
= 241 + 241 2 -
0.85 x 25 x 0.8 x 560
= 133.707
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 133.707
r = =
Bw . d . fy 200 x 241 x 240
= 0.138
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.138 x 200 x 241.0
= 6629.634 mm2
Digunakan Tulangan : 8 D 22 = 3042.286 mm2
e. Tulangan lapangan bagian dalam
M (-) = 10.335 tm = 103347986.667 Nmm
560

120
d
300
Ø 8
d'
D 25
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 25 - 8 - 40
= 239.500 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 103347986.667
Mnperlu = = = 129184983.333 Nmm
Ø 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 240 -
2
= 256326000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 103347986.667
= 240 + 240 2 -
0.85 x 25 x 0.8 x 560

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

= 50.692
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 50.692
r = =
Bw . d . fy 200 x 240 x 240
= 0.052
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.052 x 200 x 239.5
= 2513.475 mm2
Digunakan Tulangan : 5 D 25 = 2455.357 mm2
B. PENULANGAN KOLOM
1. Penulangan kolom atas
~ Mengecek pengaruh kelangsingan kolom
Untuk komponen struktur tekan yang tidak ditahan terhadap goyangan ke samping, pengaruh
kelangsingan dapat diabaikan jika memenuhi :
k . Lu
< 22 SK. SNI T - 15 - 1991 - 03. 33 11 4)
r
dimana :
k = faktor tekuk = 1
lu = panjang kolom = 3.5
I 1 / 12 x ### x ### 3
r = radius girasi = = = #REF!
A ### x ###
atau r = 0,3 . h. = 0.3 x #REF! = #REF!
Jadi :
k . Lu 1 x 3.5
= = #REF! > 22
r #REF!
#REF!
~ Faktor pembesar momen (d)
Cm
d = ≥ 1
Pu
1 -
Ø . Pc
Dimana : Cm = 1 (konservatif)
Pu = 3.554 ton
p2 . EI
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . F 'c = 4700 25 = 23500.000 Mpa = 2350000.000 t/m2
Ig = 1/12 . b. h3 =
1
Ig = x ### . ### 3 = #REF! m4
12

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

1,2 . Qdl 1.2 x 2200


Bd = = = 0.120
1,2 . Qdl + 1,6 . Qll 1.2 x 2200 + 1.6 x 12143.2
diperoleh :
2350000.0 x #REF!
EI = = #REF!
2.5 x ( 1 + 0.120 )
p2 x #REF!
Pc = = #REF!
1 x 3.5 2
1
d = = #REF! ≥ 1 #REF!
3.554
1 -
0.65 x #REF!
1.1 Penulangan untuk kolom tepi
Mu = 4.949 tm
Mc = d . Mu
= #REF! x 4.949 = #REF!
Hitung :
Pu 3.554
Pn perlu = = = 5.468 ton
Ø 0.65
Mc #REF!
Mn perlu = = = #REF! ton
Ø 0.65
Eksentrisitas :
Mn perlu #REF!
e = = = #REF!
Pn perlu 5.468
emin = 15 + 0,03 . h. = 15 + 0.03 x ### = #REF!
Syarat : emin < e ###
Hitung nilai r
~ Sumbu vertikal
Pu 3554.2
= = #REF!
Ø . Ag . 0,85 . F 'c 0.65 x ### x 400 x 0.85 x 25
~ Sumbu horizontal
Pu e #REF!
x = #REF! x = #REF!
Ø . Ag . 0,85 . F 'c h #REF!
Dari diagram interaksi kolom, diperoleh :
b =
r =
Maka, r = b . r = 0 x 0 = 0
Hitung luas tulangan :
Ast = r . Ag
= 0 x 0 x 0.0
= 0 mm2
As = As' = 1/2 . Ast = 0.5 x 0 = 0 mm2
Digunakan Tulangan : 4 Ø 22 = 1521.143 mm 2

1.2 Penulangan untuk kolom tengah


Dengan cara yang sama seperti diatas, diperoleh :
Cm Cm
d = = ≥ 1
Pu Pu
1 - 1 -
Ø . Pc Ø . Pc

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
IV. PERENCANAAN PENULANGAN BALOK DAN KOLOM
A. PENULANGAN BALOK
1. Penulangan balok atap
a. Tulangan tumpuan luar
M (-) = 1.916 tm = 19160823.340 Nmm
380

120
d
300
Ø 8
d'
Ø 8
200

d = h - 1/2 Ø tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 8 - 8 - 40
= 248.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 19160823.340
Mnperlu = = = 23951029.175 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 380 x 120 x 248 -
2
= 182172000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 19160823.340
= 248 + 248 2 -
0.85 x 25 x 0.8 x 380
= 12.263
0,85 . F 'c . Be . a aktual 0.85 x 25 x 380 x 12.263
r = =
Bw . d . fy 200 x 248 x 240
= 0.008
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.006 x 200 x 248.0
= 289.3333 mm 2

Digunakan Tulangan : 5 Ø 8 = 251.429 mm2


b. Tulangan lapangan bentang luar
M (+) = 4.265 tm = 42648874.871 Nmm
560

120
d
300
Ø 8
d'
D 16
200

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 16 - 8 - 40
= 244.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 42648874.871
Mnperlu = = = 53311093.589 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 244 -
2
= 262752000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 42648874.871
= 244 + 244 2 -
0.85 x 25 x 0.8 x 560
= 19.109
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 19.109
r = =
Bw . d . fy 200 x 244 x 240
= 0.019
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.019 x 200 x 244.0
= 947.4669 mm 2

Digunakan Tulangan : 4 D 16 = 804.571 mm2


c. Tulangan tumpuan dalam kiri
M (-) = 3.146 tm = 31457956.317 Nmm
560

120
d
300
Ø 8
d'
D 13
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 . 13 - 8 - 40
= 245.500 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 31457956.317
Mnperlu = = = 39322445.397 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 246 -
2
= 264894000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
2 x Mu
a aktual = d + d 2 -
0.85 x fc' x Ø x Be
2 x 31457956.3174451
= 246 + 246 2 -
0.85 x 25 x 0.8 x 560
= 13.851
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 13.851
r = =
Bw . d . fy 200 x 246 x 240
= 0.014
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.014 x 200 x 245.5
= 686.7599 mm 2

Digunakan Tulangan : 5 D 13 = 663.929 mm2


d. Tulangan tumpuan dalam bagian kanan
M (-) = 2.917 tm = 29171599.760 Nmm
560

120
d
300
Ø 8
d'
D 13
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 13 - 8 - 40
= 245.500 mm
1.4 1.4
rmin = = = 0.006
fy 240

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Mu 29171599.760
Mnperlu = = = 36464499.700 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 246 -
2
= 264894000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 29171599.760
= 246 + 246 2 -
0.85 x 25 x 0.8 x 560
= 12.816
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 12.816
r = =
Bw . d . fy 200 x 246 x 240
= 0.013
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.013 x 200 x 245.5
= 635.4687 mm 2

Digunakan Tulangan : 4 D 13 = 531.143 mm2


e. Tulangan lapangan bagian dalam
M (+) = 4.265 tm = 42648874.871 Nmm
560

120
d
300
Ø 8
d'
D 16
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 16 - 8 - 40
= 244.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 42648874.871
Mnperlu = = = 53311093.589 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 244 -
2
= 262752000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 42648874.871
= 244 + 244 2 -
0.85 x 25 x 0.8 x 560
= 19.109
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 19.109
r = =
Bw . d . fy 200 x 244 x 240
= 0.019
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.019 x 200 x 244.0
= 947.4669 mm2
Digunakan Tulangan : 4 D 16 = 804.571 mm2
2. Penulangan balok lantai 03
a. Tulangan tumpuan luar
M (-) = 4.499 tm = 44993051.690 Nmm
380

120
d
300
Ø 8
d'
D 16
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 . 16 - 8 - 40
= 244.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 44993051.690
Mnperlu = = = 56241314.612 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 380 x 120 x 244 -
2
= 178296000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 44993051.690
= 244 + 244 2 -
0.85 x 25 x 0.8 x 380
= 30.444
0,85 . F 'c . Be . a aktual 0.85 x 25 x 380 x 30.444
r = =
Bw . d . fy 200 x 244 x 240
= 0.02099
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.021 x 200 x 244.0

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
= 1024.306 mm2
Digunakan Tulangan : 5 D 16 = 1005.714 mm2
b. Tulangan lapangan bentang luar
M (+) = 8.315 tm = 83153592.065 Nmm
560

120
d
300
Ø 8
d'
D 22
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 22 - 8 - 40
= 241.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 83153592.065
Mnperlu = = = 103941990.081 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 241 -
2
= 258468000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 83153592.065
= 241 + 241 2 -
0.85 x 25 x 0.8 x 560
= 39.476
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 39.476
r = =
Bw . d . fy 200 x 241 x 240
= 0.041
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.041 x 200 x 241.0
= 1957.372 mm2
Digunakan Tulangan : 5 D 22 = 1901.429 mm2
c. Tulangan tumpuan dalam kiri
M (-) = 6.442 tm = 64421197.298 Nmm
560

120
d
300
Ø 8
d'
D 19
200

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
d = h - 1/2 D tul. Utama - Ø Sengkang - d'
= 300.000 - 0.5 x 19 - 8 - 40
= 242.500 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 64421197.298
Mnperlu = = = 80526496.623 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 243 -
2
= 260610000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 64421197.298
= 243 + 243 2 -
0.85 x 25 x 0.8 x 560
= 29.727
0,85 . Fc' . Be . a aktual 0.85 x 25 x 560 x 29.727
r = =
Bw . d . fy 200 x 243 x 240
= 0.030
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.030 x 200 x 242.5
= 1473.960 mm2
Digunakan Tulangan : 5 D 19 = 1418.214 mm2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
d. Tulangan tumpuan dalam bagian kanan
M (-) = 5.967 tm = 59672029.934 Nmm
560

120
d
300
Ø 8
d'
D 16
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 16 - 8 - 40
= 244.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 59672029.934
Mnperlu = = = 74590037.418 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 244 -
2
= 262752000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 59672029.934
= 244 + 244 2 -
0.85 x 25 x 0.8 x 560
= 27.205
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 27.205
r = =
Bw . d . fy 200 x 244 x 240
= 0.028
Syarat :
r > rmin Ok !!!

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Hitung luas tulangan :
As = r . Bw . d.
= 0.028 x 200 x 244.0
= 1348.939 mm 2

Digunakan Tulangan : 6 D 16 = 1206.857 mm2


e. Tulangan lapangan bagian dalam
M (+) = 8.315 tm = 83153592.065 Nmm
560

120
d
300
Ø 8
d'
D 25
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 25 - 8 - 40
= 239.500 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 83153592.065
Mnperlu = = = 103941990.081 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 240 -
2
= 256326000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c. Ø . Be
2 x 83153592.065
= 240 + 240 2 -
0.85 x 25 x 0.8 x 560
= 39.773
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 39.773
r = =
Bw . d . fy 200 x 240 x 240
= 0.041
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.041 x 200 x 239.5
= 1972.061 mm2
Digunakan Tulangan : 4 D 25 = 1964.286 mm2
3. Penulangan balok lantai 02
a. Tulangan tumpuan luar
M (-) = 4.881 tm = 48808494.124 Nmm
380

120
d
300
Ø 8
d'

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
D 16
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 16 - 8 - 40
= 244.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 48808494.124
Mnperlu = = = 61010617.655 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 380 x 120 x 244 -
2
= 178296000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 48808494.124
= 244 + 244 2 -
0.85 x 25 x 0.8 x 380
= 33.228
0,85 . F 'c . Be . a aktual 0.85 x 25 x 380 x 33.228
r = =
Bw . d . fy 200 x 244 x 240
= 0.023
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.023 x 200 x 244.0
= 1117.970 mm2
Digunakan Tulangan : 5 D 16 = 1005.714 mm2
b. Tulangan lapangan bentang luar
M (+) = 8.430 tm = 84301139.244 Nmm
560

120
d
300
Ø 8
d'
D 25
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 25 - 8 - 40
= 239.500 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 84301139.244
Mnperlu = = = 105376424.055 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 240 -
2
= 256326000

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 84301139.244
= 240 + 240 2 -
0.85 x 25 x 0.8 x 560
= 40.377
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 40.377
r = =
Bw . d . fy 200 x 240 x 240
= 0.042
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.042 x 200 x 239.5
= 2002.032 mm 2

Digunakan Tulangan : 4 D 25 = 1964.286 mm2


c. Tulangan tumpuan dalam kiri
M (-) = 6.993 tm = 69931595.958 Nmm

560

120
d
300
Ø 8
d'
D 22
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 22 - 8 - 40
= 241.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 69931595.958
Mnperlu = = = 87414494.947 Nmm
f 0.8

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 241 -
2
= 258468000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 69931595.958
= 241 + 241 2 -
0.85 x 25 x 0.8 x 560
= 32.699
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 32.699
r = =
Bw . d . fy 200 x 241 x 240
= 0.034
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.034 x 200 x 241.0
= 1621.304 mm2
Digunakan Tulangan : 4 D 22 = 1521.143 mm2
d. Tulangan tumpuan dalam bagian kanan
M (-) = 6.529 tm = 65289054.654 Nmm
560

120
d
300
Ø 8
d'
D 19
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 19 - 8 - 40
= 242.500 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 65289054.654
Mnperlu = = = 81611318.318 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 243 -
2
= 260610000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 65289054.6540934
= 243 + 243 2 -
0.85 x 25 x 0.8 x 560
= 30.156
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 30.156
r = =
Bw . d . fy 200 x 243 x 240
= 0.031

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.031 x 200 x 242.5
= 1495.225 mm 2

Digunakan Tulangan : 5 D 19 = 1418.214 mm2


e. Tulangan lapangan bagian dalam
M (+) = 6.993 tm = 69933333.333 Nmm
560

120
d
300
Ø 8
d'
D 22
200

d = h - 1/2 D tul. Utama - Ø Sengkang - d'


= 300.000 - 0.5 x 22 - 8 - 40
= 241.000 mm
1.4 1.4
rmin = = = 0.006
fy 240
Mu 69933333.333
Mnperlu = = = 87416666.667 Nmm
f 0.8
t
Mnada = 0.85 x f 'c x Be x t x d -
2
120
= 0.85 x 25 x 560 x 120 x 241 -
2
= 258468000
Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa
2 x Mu
a aktual = d + d 2 -
0.85 x f 'c x Ø x Be
2 x 69933333.333
= 241 + 241 2 -
0.85 x 25 x 0.8 x 560
= 32.699
0,85 . F 'c . Be . a aktual 0.85 x 25 x 560 x 32.699
r = =
Bw . d . fy 200 x 241 x 240
= 0.034
Syarat :
r > rmin Ok !!!
Hitung luas tulangan :
As = r . Bw . d.
= 0.034 x 200 x 241.0
= 1621.347 mm2
Digunakan Tulangan : 4 D 22 = 1521.143 mm2
B. PENULANGAN KOLOM
1. Penulangan Kolom Lantai 03
~ Mengecek pengaruh kelangsingan kolom
Untuk komponen struktur tekan yang tidak ditahan terhadap goyangan ke samping, pengaruh
kelangsingan dapat diabaikan jika memenuhi :
k . Lu
< 22 SK. SNI T - 15 - 1991 - 03. 33 11 4)
r
dimana :

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
k = faktor tekuk = 1
lu = panjang kolom = 3.5
I 1 / 12 x 20 x 20 3
r = radius girasi = = = 5.774
A 20 x 20
atau r = 0,3 . h. = 0.3 x 20 = 6
Jadi :
k . Lu 1 x 3.5
= = 58.333 > 22
r 0.06
Berarti faktor kelangsingan tak dapat diabaikan
1.1 Penulangan untuk kolom tepi
~ Faktor pembesar momen (d)
Cm
d = ≥ 1
Pu
1 -
Ø . Pc
Dimana : Cm = 1 (konservatif)
Pu = 2.439 ton
p2 . EI
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . F 'c = 4700 25 = 23500.000 Mpa = 2350000.00000 t/m2
Ig = 1/12 . b. h3 =
1
Ig = x 0.2 x 0.2 3 = 0.00013 m4
12
1,2 . Qdl 1.2 x 5207.800
Bd = = = 0.877
1,2 . Qdl + 1,6 . Qll 1.2 x 5207.800 + 1.6 x 550
diperoleh :
2350000.000 x 0.00013
EI = = 66.789
2.5 x ( 1 + 0.877 )
p2 x 66.789
Pc = = 53.756
1 x 3.5 2
1
d = = 1.075 ≥ 1 Ok !!!
2.439
1 -
0.65 x 53.756
Mu = 1.852 ton
Mc = d . Mu
= 1.075 x 1.852 = 1.991
Hitung :
Pu 2.439
Pn perlu = = = 3.752 ton
Ø 0.65
Mc 1.991
Mn perlu = = = 3.063 ton
Ø 0.65
Eksentrisitas :
Mn perlu 3.063
e = = = 0.816 m = 816.431 mm
Pn perlu 3.752
emin = 15 + 0,03 . h. = 15 + 0.03 x 200 = 21 mm
Syarat : emin < e Ok !!!
Hitung nilai r
Menentukan harga r dari grafik 9.9 hal 182 Dasar Perecanaan Beton Bertulang
Syarat : Ø = 0.65 untuk Pu < 0.1 . F 'c . Ag
2438.711 < 10000
~ Sumbu vertikal
Pu 2438.711
= = 0.004
Ø . Ag . 0,85 . F 'c 0.65 x 200 x 200 x 0.85 x 25
~ Sumbu horizontal
Pu e 816.4312
x = 0.004 x = 0.018

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
x = 0.004 x = 0.018
Ø . Ag . 0,85 . F 'c h 200
Dari diagram interaksi kolom, diperoleh :
b = 0.84 d' diambil 40 mm , h = 300 mm
r = 0.010 untuk d'/h = 0.133
Maka, r = b . r = 0.84 x 0.010 = 0.008
Hitung luas tulangan :
Ast = r . Ag Ag = 40000 mm2
= 0.008 x 40000
= 336 mm2
As = As' = 1/2 . Ast = 0.5 x 336 = 168 mm2
Digunakan Tulangan : 2 D 10 = 157.143 mm2
1.2 Penulangan untuk kolom tengah
~ Faktor pembesar momen (d)
Cm
d = ≥ 1
Pu
1 -
Ø . Pc
Dimana : Cm = 1 (konservatif)
Pu = 3.064 ton
p2 . EI
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . F 'c = 4700 25 = 23500.000 Mpa = 2350000.000 t/m2
Ig = 1/12 . b. h3 =
1
Ig = x 0.3 x 0.3 3 = 0.00068 m4
12
1,2 . Qdl 1.2 x 12143.200
Bd = = = 0.805
1,2 . Qdl + 1,6 . Qll 1.2 x ### + 1.6 x 2200
diperoleh :
2350000.000 x 0.00068
EI = = 351.438
2.5 x ( 1 + 0.805 )

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
p2 x 351.438
Pc = = 282.861
1 x 3.5 2
1
d = = 1.017 ≥ 1 Ok !!!
3.064
1 -
0.65 x 282.861
Mu = 2.407 ton
Mc = d . Mu
= 1.017 x 2.407 = 2.448
Hitung :
Pu 3.064
Pn perlu = = = 4.713 ton
Ø 0.65
Mc 2.448
Mn perlu = = = 3.766 ton
Ø 0.65
Eksentrisitas :
Mn perlu 3.766
e = = = 0.799 m = 799.045 mm
Pn perlu 4.713
emin = 15 + 0,03 . h. = 15 + 0.03 x 300 = 24 mm
Syarat : emin < e Ok !!!
Hitung nilai r
Menentukan harga r dari grafik 9.9 hal 182 Dasar Perecanaan Beton Bertulang
Syarat : Ø = 0.65 untuk Pu < 0.1 . F 'c . Ag
3063.582 < 10000
~ Sumbu vertikal
Pu 3063.582
= = 0.006
Ø . Ag . 0,85 . F 'c 0.65 x 200 x 200.0 x 0.85 x 25
~ Sumbu horizontal
Pu e 799.045
x = 0.006 x = 0.015
Ø . Ag . 0,85 . F 'c h 300
Dari diagram interaksi kolom, diperoleh :
b = 0.84
r = 0.013
Maka, r = b . r = 0.84 x 0.013 = 0.011
Hitung luas tulangan :
Ast = r . Ag Ag = 40000 mm2
= 0.011 x 40000
= 420 mm 2

As = As' = 1/2 . Ast = 0.5 x 420 =210.000 mm2


Digunakan Tulangan : 2 D 10 = 157.143 mm2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
2. Penulangan Kolom Lantai 02
~ Mengecek pengaruh kelangsingan kolom
Untuk komponen struktur tekan yang tidak ditahan terhadap goyangan ke samping, pengaruh
kelangsingan dapat diabaikan jika memenuhi :
k . Lu
< 22 SK. SNI T - 15 - 1991 - 03. 33 11 4)
r
dimana :
k = faktor tekuk = 1
lu = panjang kolom = 3.5
I 1 / 12 x 30 x 30 3
r = radius girasi = = = 8.660
A 30 x 30
atau r = 0,3 . h. = 0.3 x 30 = 9
Jadi :
k . Lu 1 x 3.5
= = 38.889 > 22
r 0.09
Berarti faktor kelangsingan tak dapat diabaikan
1.1 Penulangan untuk kolom tepi
~ Faktor pembesar momen (d)
Cm
d = ≥ 1
Pu
1 -
Ø . Pc
Dimana : Cm = 1 (konservatif)
Pu = 5.089 ton
p . EI
2
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . F 'c = 4700 25 = 23500.000 Mpa = 2350000.000 t/m2
Ig = 1/12 . b. h3 =
1
Ig = x 0.3 x 0.3 3 = 0.00068 m4
12
1,2 . Qdl 1.2 x 7568.600
Bd = = = 0.838
1,2 . Qdl + 1,6 . Qll 1.2 x 7568.600 + 1.6 x 1100
diperoleh :
2350000.000 x 0.00068
EI = = 345.274
2.5 x ( 1 + 0.838 )
p2 x 345.274
Pc = = 277.899
1 x 3.5 2
1
d = = 1.029 ≥ 1 Ok !!!
5.089
1 -
0.65 x 277.899
Mu = 2.632 ton
Mc = d . Mu
= 1.029 x 2.632 = 2.708

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Hitung :
Pu 5.089
Pn perlu = = = 7.829 ton
Ø 0.65
Mc 2.708
Mn perlu = = = 4.166 ton
Ø 0.65
Eksentrisitas :
Mn perlu 4.166
e = = = 0.532 m = 532.185 mm
Pn perlu 7.829
emin = 15 + 0,03 . h. = 15 + 0.03 x 300 = 24 mm
Syarat : emin < e Ok !!!
Hitung nilai r
Menentukan harga r dari grafik 9.9 hal 182 Dasar Perecanaan Beton Bertulang
Syarat : Ø = 0.65 untuk Pu < 0.1 . F 'c . Ag
5088.768 < 22500
~ Sumbu vertikal
Pu 5088.768
= = 0.004
Ø . Ag . 0,85 . F 'c 0.65 x 300 x 300 x 0.85 x 25
~ Sumbu horizontal
Pu e 532.185
x = 0.004 x = 0.007
Ø . Ag . 0,85 . F 'c h 300
Dari diagram interaksi kolom, diperoleh :
b = 0.84
r = 0.014
Maka, r = b . r = 0.84 x 0.014 = 0.012
Hitung luas tulangan :
Ast = r . Ag Ag = 40000 mm2
= 0.012 x 40000
= 470.400 mm 2

As = As' = 1/2 . Ast = 0.5 x 470.4 = 235.2 mm2


Digunakan Tulangan : 2 Ø 12 = 226.286 mm2
1.2 Penulangan untuk kolom tengah
~ Faktor pembesar momen (d)
Cm
d = ≥ 1
Pu
1 -
Ø . Pc
Dimana : Cm = 1 (konservatif)
Pu = 6.101 ton
p . EI
2
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . F 'c = 4700 25 = 23500.000 Mpa = 2350000.000 t/m2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Ig = 1/12 . b. h3
1
Ig = x 0.3 x 0.3 3 = 0.00068 m4
12
1,2 . Qdl 1.2 x 12143.200
Bd = = = 0.805
1,2 . Qdl + 1,6 . Qll 1.2 x ### + 1.6 x 2200
diperoleh :
2350000.000 x 0.00068
EI = = 351.438
2.5 x ( 1 + 0.805 )
p2 x 351.438
Pc = = 282.861
1 x 3.5 2
1
d = = 1.034 ≥ 1 Ok !!!
6.101
1 -
0.65 x 282.861
Mu = 6.529 ton
Mc = d . Mu
= 1.034 x 6.529 = 6.753
Hitung :
Pu 6.101
Pn perlu = = = 9.385 ton
Ø 0.65
Mc 6.753
Mn perlu = = = 10.389 ton
Ø 0.65
Eksentrisitas :
Mn perlu 10.389
e = = = 1.107 m = 1106.942 mm
Pn perlu 9.385
emin = 15 + 0,03 . h. = 15 + 0.03 x 300 = 24 mm
Syarat : emin < e Ok !!!
Hitung nilai r
Menentukan harga r dari grafik 9.9 hal 182 Dasar Perecanaan Beton Bertulang
Syarat : Ø = 0.65 untuk Pu < 0.1 . F 'c . Ag
6100.565 < 22500
~ Sumbu vertikal
Pu 6100.565
= = 0.011
Ø . Ag . 0,85 . F 'c 0.65 x 200 x 200 x 0.85 x 25
~ Sumbu horizontal
Pu e 1106.942
x = 0.011 x = 0.041
Ø . Ag . 0,85 . F 'c h 300
Dari diagram interaksi kolom, diperoleh :
b = 0.84
r = 0.004
Maka, r = b . r = 0.84 x 0.004 = 0.003

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Hitung luas tulangan :
Ast = r . Ag Ag = 40000 mm2
= 0.003 x 40000
= 134.4 mm2
As = As' = 1/2 . Ast = 0.5 x 134.4 = 67.2 mm2
Digunakan Tulangan : 2 Ø 6 = 56.571 mm2
3. Penulangan Kolom Lantai 01
~ Mengecek pengaruh kelangsingan kolom
Untuk komponen struktur tekan yang tidak ditahan terhadap goyangan ke samping, pengaruh
kelangsingan dapat diabaikan jika memenuhi :
k . Lu
< 22 SK. SNI T - 15 - 1991 - 03. 33 11 4)
r
dimana :
k = faktor tekuk = 1
lu = panjang kolom = 3.5
I 1 / 12 x 30 x 30 3
r = radius girasi = = = 8.660
A 30 x 30
atau r = 0,3 . h. = 0.3 x 30 = 9
Jadi :
k . Lu 1 x 3.5
= = 38.889 > 22
r 0.09
Berarti faktor kelangsingan tak dapat diabaikan
1.1 Penulangan untuk kolom tepi
~ Faktor pembesar momen (d)
Cm
d = ≥ 1
Pu
1 -
Ø . Pc
Dimana : Cm = 1 (konservatif)
Pu = 5.047 ton
p2 . EI
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . F 'c = 4700 25 = 23500.000 Mpa = 2350000.000 t/m2
Ig = 1/12 . b. h3 =
1
Ig = x 0.3 x 0.3 3 = 0.00068 m4
12
1,2 . Qdl 1.2 x 6304.600
Bd = = = 0.753
1,2 . Qdl + 1,6 . Qll 1.2 x 6304.600 + 1.6 x 1550
diperoleh :
2350000.000 x 0.00068
EI = = 361.925
2.5 x ( 1 + 0.753 )
p2 x 361.925
Pc = = 291.301
1 x 3.5 2
1
d = = 1.027 ≥ 1 Ok !!!
5.047
1 -
0.65 x 291.301
Mu = 2.067 ton
Mc = d . Mu
= 1.027 x 2.067 = 2.124
Hitung :
Pu 5.047
Pn perlu = = = 7.764 ton
Ø 0.65
Mc 2.124
Mn perlu = = = 3.268 ton
Ø 0.65
Eksentrisitas :

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Mn perlu 3.268
e = = = 0.421 m = 420.856 mm
Pn perlu 7.764
emin = 15 + 0,03 . h. = 15 + 0.03 x 300 = 24 mm
Syarat : emin
< e Ok !!!
Hitung nilai r
Menentukan harga r dari grafik 9.9 hal 182 Dasar Perecanaan Beton Bertulang
Syarat : Ø = 0.65 untuk Pu < 0.1 . F 'c . Ag
5046.812 < 22500
~ Sumbu vertikal
Pu 5046.812
= = 0.004
Ø . Ag . 0,85 . F 'c 0.65 x 300 x 300 x 0.85 x 25
~ Sumbu horizontal
Pu e 420.856
x = 0.004 x = 0.006
Ø . Ag . 0,85 . F 'c h 300
Dari diagram interaksi kolom, diperoleh :
b = 0.84
r = 0.013
Maka, r = b . r = 0.84 x 0.013 = 0.011
Hitung luas tulangan :
Ast = r . Ag Ag = 40000 mm2
= 0.011 x 40000
= 420 mm2
As = As' = 1/2 . Ast = 0.5 x 420 = 210 mm2
Digunakan Tulangan : 2 D 10 = 157.143 mm2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
1.2 Penulangan untuk kolom tengah
~ Faktor pembesar momen (d)
Cm
d = ≥ 1
Pu
1 -
Ø . Pc
Dimana : Cm = 1 (konservatif)
Pu = 6.143 ton
p . EI
2
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . F 'c = 4700 25 = 23500.000 Mpa = 2350000.000 t/m2
Ig = 1/12 . b. h 3
=
1
Ig = x 0.3 x 0.3 3 = 0.00068 m4
12
1,2 . Qdl 1.2 x 15910.400
Bd = = = 0.658
1,2 . Qdl + 1,6 . Qll 1.2 x ### + 1.6 x 6200
diperoleh :
2350000.000 x 0.00068
EI = = 382.672
2.5 x ( 1 + 0.658 )
p x 382.672
2
Pc = = 307.999
1 x 3.5 2
1
d = = 1.032 ≥ 1 Ok !!!
6.143
1 -
0.65 x 307.999
Mu = 2.951 ton
Mc = d . Mu
= 1.032 x 2.951 = 3.045
Hitung :
Pu 6.143
Pn perlu = = = 9.450 ton
Ø 0.65
Mc 3.045
Mn perlu = = = 4.684 ton
Ø 0.65
Eksentrisitas :
Mn perlu 4.684
e = = = 0.496 m = 495.706 mm
Pn perlu 9.450
emin = 15 + 0,03 . h. = 15 + 0.03 x 300 = 24 mm
Syarat : emin < e Ok !!!
Hitung nilai r
Menentukan harga r dari grafik 9.9 hal 182 Dasar Perecanaan Beton Bertulang
Syarat : Ø = 0.65 untuk Pu < 0.1 . F 'c . Ag
6142.522 < 22500

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
~ Sumbu vertikal
Pu 6142.522
= = 0.011
Ø . Ag . 0,85 . F 'c 0.65 x 200 x 200 x 0.85 x 25
~ Sumbu horizontal
Pu e 495.7061
x = 0.011 x = 0.018
Ø . Ag . 0,85 . F 'c h 300
Dari diagram interaksi kolom, diperoleh :
b = 0.84
r = 0.004
Maka, r = b . r = 0.84 x 0.004 = 0.003
Hitung luas tulangan :
Ast = r . Ag Ag = 40000 mm2
= 0.003 x 40000
= 134.4 mm2
As = As' = 1/2 . Ast = 0.5 x 134.4 = 67.2 mm2
Digunakan Tulangan : 2 Ø 6 = 56.571 mm2
C. PENULANGAN GESER BALOK
1. Balok Atap
Diambil gaya geser maksimum pada lantai atap : Vu = 3.064 ton
vud = 30635.823 N
###

242.5 mm a. Penampang Kritis Pertama pada Jarak d


### 2500 - 242.5
Vud = x ###
2500
5000.000 mm Vud = ###
b. Kapasitas Geser Balok
Vc = 1/6 . F 'c . b . d = 1/6 x 25 x 200 x 242.5
= 40416.667 N
Vc' = 0.5 . Vc = 20208.333 N
Vud ###
Vs = x Vc' = - 20208.333 = ###
Ø 0.6
Direncanakan tulangan sengkang Ø 6 Av = 56.549 mm²
d
= ###
4
Av . fy . d 56.548668 x 240 x 242.5 d
s = = = 127.078 mm >
Vs 25898.58 4
Jadi digunakan sengkang Ø 6 - 150

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
c. Untuk Daerah Diluar Jarak d
Direncanakan tulangan sengkang Ø 6 Av = 56.549 mm²
d
= ###
2
Av . fy . d 56.548668 x 240 x 242.5 d
s = = = 127.078 mm >
Vs 25898.580 2
Jadi digunakan sengkang Ø 6 - 150
2. Balok Lantai 03
Diambil gaya geser maksimum pada lantai 03 : Vu = 6.101 ton
vud = 61005.652 N
###
a. Penampang Kritis Pertama pada Jarak d
2500 - 242.5
Vud = x ###
242.5 mm 2500
### Vud = ###

5000.000 mm
b. Kapasitas Geser Balok
Vc = 1/6 . F 'c . b . d = 1/6 x
x 25 x 200 x 242.5
= 40416.667 N
Vc' = 0.5 . Vc = 20208.333 N
Vud ###
Vs = x Vc' = - 20208.333 = ###
Ø 0.6
Direncanakan tulangan sengkang Ø 8 Av = 100.531 mm²
d
= ###
4
Av . fy . d 100.53096 x 240 x 242.5 d
s = = = 81.711 mm >
Vs 71605.172 4
Jadi digunakan sengkang Ø 8 - 150
c. Untuk Daerah Diluar Jarak d
Direncanakan tulangan sengkang Ø 10 Av = 157.080 mm²
d
= ###
2
Av . fy . d 157.07963 x 240 x 242.5 d
s = = = 127.673 mm >
Vs 71605.17 2
Jadi digunakan sengkang Ø 10 - 150
3. Balok Lantai 02
Diambil gaya geser maksimum pada lantai 02 : Vu = 6.143 ton
vud = 61425.217 N
###
a. Penampang Kritis Pertama pada Jarak d
2500 - 242.5
Vud = x ###
242.5 mm 2500
### Vud = ###

5000.000 mm

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
b. Kapasitas Geser Balok
Vc = 1/6 . F 'c . b . d = 1/6 x
x 25 x 200 x 242.5
= 40416.667 N
Vc' = 0.5 . Vc = 20208.333 N
Vud ###
Vs = x Vc' = - 20208.333 = ###
Ø 0.6
Direncanakan tulangan sengkang Ø 8 Av = 100.531 mm²
d
= ###
4
Av . fy . d 100.53096 x 240 x 242.5 d
s = = = 80.996 mm >
Vs 72236.62 4
Jadi digunakan sengkang Ø 8 - 150
c. Untuk Daerah Diluar Jarak d
Direncanakan tulangan sengkang Ø 10 Av = 157.080 mm²
d
= ###
2
Av . fy . d 157.07963 x 240 x 242.5 d
s = = = 126.557 mm >
Vs 72236.619 2
Jadi digunakan sengkang Ø 10 - 150

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

V. DIMENSI DAN PENULANGAN PONDASI

A B

Dari hasil perhitungan, diperoleh :


RA = 100936.2 N
RB = 117371.9 N
Data - data :
~ Dimensi kolom, hc = 25.00 cm = 250 mm
~ Dimensi kolom, bc = 25.00 cm = 250 mm
~ Kuat rencana beton, f 'c = 25 Mpa
~ Kuat leleh baja tulangan, fy = 240 Mpa
~ Daya dukung tanah, st = 0.15 Mpa
~ Dalam pondasi, Htot = 6 m = 6000 mm
~ Berat vol. tanah urug, gt = 18000 N/m3
P

6 m

d
d'

hc L

bc

1. PONDASI A
Data :

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
P = 100936.232 N
Htot = H + h
h = 50 cm = 500 mm (ditaksir)
jadi : H = 5500 mm = 5.5 m
1.1 Perencanaan Dimensi Pondasi
q1 = H . gt = 5.5 x 18000 = 99000 N/m2 = 0.099 N/mm2
Taksir tebal slab = 50 cm
q2 = h . gt = 0.5 x 18000 = 9000 N/m2 = 0.009 N/mm2
snetto = st - q1 - q2 = 0.15 - 0.099 - 0.009 = 0.042 N/mm2
L = 1 s/d 2B diambil L = 1,5
Sehingga :
P 100936.2
B x L = B x 1,5 . B =
snetto 0.042
1,5 . B2 = 2403243.61419
B = 1266 mm
L = 1.5 x B = 1899 mm

1.2 Kontrol Daya Dukung Tanah


qs = st = 0.15 Mpa
Pu + Af . ( q1 + q2 ) 100936.2 + 1266 x 1899 x 0.099 + 0.009
qsunetto = =
Af 1266 x 1899
= 0.150 Mpa
Syarat :
qsunetto < qs Ok !!!
1.3 Tebal slab yang ditinjau dari geser dua arah
Syarat : Ø Vc > Vu
Dimana : Vc = ((hc + d) + (bc + d)) . 2 . d 1/3 f 'c
Vu = Af - (hc + d) . (bc + d) qsunetto
Ø = 0,60

B
bc + d
bc

hc

hc + d

Vc = ((hc + d) + (bc + d)) . 2 . d 1/3 f 'c


1
Vc = 250 + d + 250 + d x 2 x d x 25
3
1
= 1000 x d + 4 x d 2 x x 25
3
= 1666.667 d + 6.667 d 2

Vu = Af - (hc + d) . (bc + d) qsunetto

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Vu = 1266 x 1899 + 250 + d x 250 + d x 0.150

= 2404134 - 62500 + 500 d + d 2


0.150
= 351208.7 - 74.992 d - 0.150 d2
Syarat : Ø Vc > Vu
0.6 x 1666.667 d + 6.667 d2 ≥ 351208.7 - 74.992 d - 0.15 d2
1000 d + 4 ≥ 351208.7 - 74.992 d - 0.15 d2
4.150 d2 + 1074.992 d - 351208.7 ≥ 0
Diambil 4.150 d2 + 1074.992 d - 351208.7 = 0
Diperoleh : d = 188.922 mm
1.4 Tebal slab yang ditinjau dari geser satu arah

L hc
af = - - d
2 2
Bidang geser
1
= x 1899 - 250 - d
bc

hc 2
= 824.5 - d

d af

1
Vc = x f 'c x B x d
6
1
= x 25 x 1266 x d
6
= 1055 d
Vu = B . Af . Qsunetto
= 1266 x ( 824.5 - d )x 0.150
= 156556.3 - 189.880 d
Syarat : Ø Vc > Vu
0.6 x ( 1055 d ≥ 156556.3 - 189.880 d )
( 633 d ≥ 156556.3 - 189.880 d )
Diambil : ( 633 d = 156556.3 - 189.880 d )
822.8803 d = 156556.3
d = 190.254 mm
Dengan demikian, tebal slab pondasi (h) = d + d' = 190.254 + 100
= 290.254 mm
Kesimpulan hasil perhitungan :
~ Panjang slab pondasi L = 1899 mm ≈ 190 cm
~ Lebar slab pondasi B = 1266 mm ≈ 127 cm
~ Tebal slab pondasi h = 290 mm ≈ 30 cm
~ Tinggi efektif d = 190 mm ≈ 20 cm
~ Beton dekking d' = 100 mm ≈ 10 cm
1.5 Perhitungan luas tulangan
~ Tulangan arah panjang L
Syarat : Ø Mn ≥ Mu
As. Fy
Mn = As. x fy x d -
1,7 . F 'c . B
As. 240
= As. x 240 x 190.3 -
1.7 x 25 x 1266
= 45660.97 As. - 1.071 As2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
1 dimana : Ly = 1/2 . ( L - hc )
Mu = x qsunetto x B x Ly2
2 1
= x 1899 - 250
1 2
= x 0.150 x 1266 x 824.5 2
2 = 824.500 mm
= 64540340.228 Nmm
Syarat : Ø Mn ≥ Mu
0.8 . 45660.97 As. - 1.071 As2 ≥ 64540340.228
1.071 As 2
- 45660.97 As. + 80675425.285 ≥ 0
Diambil : 1.071 As2 - 45660.97 As. + 80675425.285 = 0
Diperoleh :
As. = ### mm
Digunakan Tulangan : 4 Ø 22 = 1521.143 mm2
~ Tulangan arah pendek B
As. Fy d0 = d - 1/2 . ( dtul 1 + dtul. 2)
Mn = As. x fy x d0 -
1,7 . F 'c . L = 190.3 - 0.5 19 + 19
As. 240 = 171.3 mm
= As. x 240 x 171.3 -
1.7 x 25 x 1899
= 41100.97 As. - 0.714 As2
1 dimana : Lx = 1/2 . ( B - bc )
Mu = x qsunetto x L x Lx2
2 1
= x 1266 - 250
1 2
= x 0.150 x 1899 x 508 2
2 = 508 mm
= 36750953.741 Nmm
Syarat : Ø Mn ≥ Mu
0.8 x 41100.97 As2 - 0.714 As2 ≥ 36750953.741
0.714 As2 - 41100.97 As2 + 45938692.176 ≥ 0
Diambil : 0.714 As2 - 41100.97 As. + 45938692.176 = 0
Diperoleh :
As. = 1096.814 mm
Digunakan Tulangan : 3 Ø 22 = 1140.857 mm2
Kontrol :
Asmin = rmin . b .d
1.4
Asmin Arah B = x 1899 x 171.3 = 1897.067 mm2
240
1.4
Asmin Arah L = x 1266 x 190.3 = 1405.026 mm2
240
Dari hasil perhitungan luas tulangan, ternyata As yang diperoleh lebih kecil dari Asmin,
sehingga digunakan Asmin untuk mencari tulangan yang digunakan.
Untuk arah B
Digunakan Tulangan : 4 Ø 22 = 1521.143 mm2
Untuk arah L
Digunakan Tulangan : 4 Ø 22 = 1521.143 mm2
~ Kontrol Panjang Penyaluran
0.02 x Ab . Fy 0.02 x p/4 x 22 2 x 240
Ld perlu = = = 364.927 mm
f 'c 25
Ld min = 0.06 x db x fy
= 0.06 x 22 x 240
= 316.800 mm
1
Ld ada = x B - bc - d'
2
1
= x 1266 - 250 - 100
2
= 458 mm
Ld min < Ld perlu Ok !!!
Ld ada > Ld perlu Ok !!!
~ Tulangan Dowel / Pasak
P 100936.232
- f 'c tekan pada kaki kolom = = = 1.615 Mpa
hc . bc 250 x 250
- Kuat dukung = Ø . ( 0,85 . F 'c . A2/A1)
250 x 1266
= 0.65 x 0.85 x 25 x
250 x 250
= 31.083 < f 'c tekan kolom Ok !!!
Sehingga perlu tulangan Dowel 0,5 % . 250 x 250 = 312.5 mm2
Digunakan Tulangan : 2 Ø 12 = 226.286 mm2
~ Penyebaran tulangan
2 . nb 2 x 7
Tulangan Arah B = = = 5.60 Batang
L 1899
+ 1 + 1
B 1266
Sisanya : 7 batang - 6 batang = 1 batang (sebar rata)
~ Kontrol tahanan kaki kolom
P = 100936.2 N
Daya dukung kaki kolom = Ø . 0,85 . F 'c . bc . hc
= 0.65 x 0.85 x 25 x 250 x 250
= 863281.3 N > P Ok !!!
Daya dukung beton slab tertekan = 0,85 . F 'c . Bc . Hc . A2 / A1
250 x 1266
= 0.85 x 25 x 250 x 250
250 x 250
= 2988723.926 N > P Ok !!!
SKETSA TULANGAN PONDASI ( A )

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

550 cm

20 cm

30 cm

190 cm

127 cm

190 cm

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
VI. DIMENSI, PENULANGAN ,DAN PONDASI TANGGA

VI.1. DIMENSI DAN PENULANGAN TANGGA


Denah tangga :
1.5 m 3.5 m

+ 3.50

+ 1.10

Data - data beban :


~ Beban Hidup (qberguna) = 300 kg/m2
~ Beban mati
q tegel + spasi = 4.5 kg/m2
q berat sendiri = 0.2 x 2400 kg/m3 = 480 kg/m2
= 484.5 kg/m2
qu = 1,2 q LL + 1,6 q DL
= 1.2 x 300 + 1.6 x 484.5
= 1135.2 kg/m2
Ketentuan - ketentuan
Langkah datar = 30 cm (Antrede)
Langkah naik = 20 cm (Uptrede)
Lebar tangga = 150 cm
~ Tangga atas ( Peil lantai 02 = 350 cm )
330
- Banyaknya langkah datar = = 11
30
- Banyaknya langkah naik = 11 + 1 = 12
- Peil bordes = 350 - 12 x 20 = 110
~ Tangga atas
110
- Banyaknya langkah naik = = 5.5
20

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
- Banyaknya langkah naik = 5.5 - 1 = 4.5
- Peil bordes = 4.50 x 30 = 135 cm
Penulangan Anak Tangga
30 cm

16 cm
20 cm

Kondisi pembebanan Anak Tangga

q = 1135.200 kg/m2 qu = 1135.2 x 0.3 = 340.56 kg/m

Mmaks = 1/8 . qu . l2 = 95.783 kgm


1.5 m = 957825 Nmm

Data - data : b = 30 cm
d = 16 cm
f 'c = 25 Mpa
fy = 240 Mpa
Mu = 957825 Nmm
Hitung :
1.4 1.4
rmin = = = 0.006
fy 240
0.85 x f 'c 600 0.85 x 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040
600 600
amaks = 0.75 x b1 x xd = 0.75 0.85 160
600 + fy 600 + 240
= 72.857
amaks
Mnada = 0.85 x f 'c x b x amaks x d -
2
72.86
= 0.85 x 25 x 300 x 72.86 x 160 -
2
= 57394515.306 Nmm
Mu 957825
Mnperlu = = = 1197281.250 Nmm
Ø 0.8
Mn ada > Mn perlu Tulangan tunggal
fy 240
m = = = 11.294
0.85 x f 'c 0.85 x 25

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Mu 957825
Rn = = = 0.156
Ø x b x d2 0.80 x 300 x 160 2
1 2 x m x Rn
r = x 1 - 1 -
m fy
1 2 x 11.294 x 0.156
r = x 1 - 1 -
11.294 240
r = 0.00065
Periksa :
r < rmin ( Digunakan Rasio Tulangan Minimum )
r < rmaks ( OK )
Hitung Luas Tulangan :
As = r x b x d
As = 0.006 . 300 . 160
As = 280.000 mm2

Digunakan Tulangan : 3 Ø 10 = 235.714 mm2

3 Ø 10

Penulangan Geser
Diagram gaya geser :
2554.2 N

160mm

750 mm

750 - 160
Vud = x 2554.2 = 2009.304 N
750

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Vud 2009.304
Vn = = = 3348.84
f 0.6
1 1
Vc = x f 'c x b x d = x 25 x 300 x 160
6 6
=
40000 N
Vud
Ø
< Vc Digunakan tulangan geser praktis Ø 8 - 250
Penulangan Bordes

Ly 1.5
= = 1
Lx 1.5

1.5 m q = 1135.200 kg/m2 x 1.5 m


= 1702.800 kg/m

1.5 m

ql2 = 1702.800 x 1.5 2 = 3831.3 kgm = 383130 kgcm


Mx = + 0,001 . 21 . ql2 = + 8045.730 kgcm
Mx = + 0,001 . 21 . ql2 = + 8045.730 kgcm
Mx = - 0,001 . 52 . ql2 = - 19922.760 kgcm
Mx = - 0,001 . 52 . ql2 = - 19922.760 kgcm

dx = 10,8 dy = 15 - 3 0,4 = 11,6

dx = 10.8 cm
dy = 11.6 cm
Mx (+) = 8045.730 kgcm
fy 2
Mu
As2 - fy . d. As + = 0
1,7 . F 'c .b Ø
240 2 8045.730
As2 - 240 x 10.8 x As + = 0
1.7 25 100 0.8
13.553 As2 - 2592 As + 10057.163 = 0
Dengan rumus ABC diperoleh : As = 3.962 cm2
Digunakan Tulangan : Ø 8 - 15 = 3.351 cm2
Mx (-) = 19922.760 kgcm
fy2 Mu
As2 - fy . d. As + = 0
1,7 . F 'c .b Ø
240 2 19922.760
As2 - 240 x 10.8 x As + = 0
1.7 25 100 0.8

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
13.553 As - 2592
2
As + 24903.450 = 0
Dengan rumus ABC diperoleh : As = 10.146 cm2
Digunakan Tulangan : Ø 14 - 15 = 10.263 cm2
My (+) = 8045.73 kgcm
fy2
Mu
As2 - fy . d. As + = 0
1,7 . F 'c .b Ø
240 2 8045.730
As2 - 240 x 11.6 x As + = 0
1.7 25 100 0.8
13.553 As2 - 2784 As + 10057.163 = 0
Dengan rumus ABC diperoleh : As = 3.678 cm2
Digunakan Tulangan : Ø 8 - 15 = 3.351 cm2
My (+) = 19922.760 kgcm
fy2 Mu
As2 - fy . d. As + = 0
1,7 . F 'c .b Ø
240 2 19922.760
As2 - 240 x 11.6 x As + = 0
1.7 25 100 0.8
13.553 As2 - 2784 As + 24903.450 = 0
Dengan rumus ABC diperoleh : As = 9.373 cm2
Digunakan Tulangan : Ø 12 - 15 = 7.540 cm2

Ø 8 - 15

Ø 8 - 15 Ø 12 - 15

Ø 12 - 15 Ø 8 - 15

Ø 8 - 15

TANGGA BAWAH / PORTAL 25 / 40


~ Beban anak tangga, qu = 1135.200 kg/m2 x 1.5 m = 1702.800 kg/m
~ Berat sendiri portal

A B
1.1
tan a = = 0.314
3.5
a = 37.07
1.10 m

sin a = 0.603
a cos a = 0.798
C

1.5 m 3.5 m

1
~ Berat sendiri portal BC = 0.25 x 0.4 x 2400 x = 300.790 kg/m
0.7979
qu = 1.2 x 300.790 = 360.948 kg/m
q BC = 1702.800 + 360.948 = 2063.748 kg/m
Bentang AB.
~ Beban anak tangga = 1702.800 kg/m
qu AB. = 0.25 x 0.4 x 2400 x 1.2 = 288 kg/m
1990.800 kg/m
1990.800 kg/m 2063.748 kg/m

1.10 m

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

1.5 m 3.5 m

Momen Primer :
1 1
MAB = - x q l 2 = x x 1990.800 x 1.5 2 = - 373.275 kg/m
12 12
MBA = 373.275 kgm
1 1
MBC = - x q l 2 = - x 2063.748 x 3.5 2 = - 2106.742 kg/m
12 12
MBA = 2106.742 kgm
Faktor kekakuan
4 EI 4 EI
KAB = KBA = = = 2.667
L 1.5
4 EI 4 EI
KBC = KCB = = = 1.143
L 3.5
Tabel Momen Distribusi

Titik A B C
Batang AB. BA BC CB
K 2.667 2.667 1.143 1.143
DF 1 0.7 0.3 0
FEM -373.275 373.275 -2106.742 2106.742
Bal 373.275 1213.427 520.040 0.000
Co 606.714 186.638 0.000 260.020
Bal -606.714 -130.646 -55.991 0.000
Co -65.323 -303.357 0.000 -27.996
Bal 65.323 212.350 91.007 0.000
Co 106.175 32.662 0.000 45.504
Bal -106.175 -22.863 -9.798 0.000
Co -11.432 -53.087 0.000 -4.899
Bal 11.432 37.161 15.926 0.000
Co 18.581 5.716 0.000 7.963
Bal -18.581 -4.001 -1.715 0.000
Co -2.001 -9.290 0.000 -0.857
Bal 2.001 6.503 2.787 0.000
Co 3.252 1.000 0.000 1.394
Bal -3.252 -0.700 -0.300 0.000
Co -0.350 -1.626 0.000 -0.150
Bal 0.350 1.138 0.488 0.000
Co 0.569 0.175 0.000 0.244
Bal -0.569 -0.123 -0.053 0.000
Co -0.061 -0.285 0.000 -0.026
Bal 0.061 0.199 0.085 0.000
Co 0.100 0.031 0.000 0.043

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Bal -0.100 -0.021 -0.009 0.000
Co -0.011 -0.050 0.000 -0.005
Bal 0.011 0.035 0.015 0.000
Co 0.017 0.005 0.000 0.007
Bal -0.017 -0.004 -0.002 0.000
Co -0.002 -0.009 0.000 -0.001
Bal 0.002 0.006 0.003 0.000
Total 0.000 1544.259 -1544.259 2387.983
FREE BODY STRUKTUR
1990.8 kg/m 2063.748 kg/m

1544.259 kgm
1544.259 kgm

1.10 m

2387.983

1.5 m 3.5 m

Gaya Dalam 1119.825


Bentang AB.
1990.800 kg/m
A SMB = 0
VA x 1.5 - 1.5 x 1990.800 x 0.75 + 1544.259 = 0
1544.259 VA = 463.594 kg
RA

Mx = 463.594 x - 1/2 . 1990.8 x2


Mx = 463.594 x - 995.4 x2
Dx = 463.594 - 1990.8 x
Untuk x = 0 Mx = 0 Dx = 463.594 kg
x = 1,5 Mx = -1544.26 kgm Dx = -2522.61 kg
Dx = 0 x = 0.233 m
Mmaks = 53.97815 kgm
Bentang BC
2063.748 kg/m
B
HA SMC = 0
1544.259 kgm VA . ( 5 ) + HA ( 1.1 ) - ( 1990.80 .1.5)
. ( 4.25 ) - ( 7223.12 x 1.75 ) + 2387.98
2522.606 HA = 18750.774 kg

1.10 m

SMB = 0
-HC . 1.1 - 2387.983 - 12640.45 + 1544.26
+ VC . 3.5 =0
C
2387.98 kgm HC VC = 9745.723 kg

VC
SV = 0
VA + VC = 1990.8 x 1.5 + 2063.748 x 3.5
10209.32 = 10209.32 Ok !!
Mx = VC . x - HC . y - 1/2 . q . x2 - 2387.983
= 9745.7 x - 18750.77 x 0.314 x - 1031.874 x2 - 2387.983
= -1031.874 x2 + 3852.6 x - 2387.983
Dx = -2063.748 x + 3852.6
Untuk x = 0 Mx = -2387.98 Dx = -2063.75 kg

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
x= 3.5 Mx = ### kgm Dx = -3370.49 kg
Dx = 0 x = 1.867 m
Mmaks = 1208.072 kgm
Perencanaan Penulangan Balok
Balok AB.
~ M (-) = 1544.259 kgm = 15442590.03 Nmm

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

d = h - 1/2 Ø tul. Utama - Ø Sengkang - d'


= 300.00 - 0.5 x 12 - 8 - 40
300 = 246.000 mm
Ø 8

Ø 12
200

Hitung :
1.4 1.4
rmin = = = 0.006
fy 240
0.85 x f 'c 600 0.85 x 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040
600 600
amaks = 0.75 x b1 x xd = 0.75 0.85 246
600 + fy 600 + 240
= 112.018
amaks
Mnada = 0.85 x f 'c x b x amaks x d -
2
112
= 0.85 x 25 x 200 x 112 x 246 -
2
= 90450168.965 Nmm
Mu 15442590.033
Mnperlu = = = 19303237.541 Nmm
Ø 0.8
Mn ada > Mn perlu Tulangan tunggal
fy 240
m = = = 11.294
0.85x f 'c 0.85 x 25
Mu 15442590.0328681
Rn = = = 1.595
Ø x b x d2 0.80 x 200 x 246 2
1 2 x m x Rn
r = x 1 - 1 -
m fy
1 2 x 11.294 x 1.595
r = x 1 - 1 -
11.294 240
r = 0.00692
Periksa :
r > rmin ( OK )
r < rmaks ( OK )
Hitung Luas Tulangan :

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
As = r x b x d
As = 0.007 . 200 . 246
As = 340.239 mm2

Digunakan Tulangan : 3 Ø 12 = 339.429 mm2 3 Ø 12

~ M (+) = 53.97815 kgm = 539781.4818 Nmm

d = h - 1/2 Ø tul. Utama - Ø Sengkang - d'


= 300.00 - 0.5 x 10 - 8 - 40
300 = 247.000 mm
Ø 8

Ø 10
200

Hitung :
1.4 1.4
rmin = = = 0.006
fy 240
0.85 x f 'c 600 0.85 x 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040
600 600
amaks = 0.75 x b1 x xd = 0.75 0.85 247
600 + fy 600 + 240
= 112.473
amaks
Mnada = 0.85 x f 'c x b x amaks x d -
2
112.5
= 0.85 x 25 x 200 x 112.5 x 247 -
2
= 91187030.841 Nmm
Mu 539781.482
Mnperlu = = = 674726.852 Nmm
Ø 0.8
Mn ada > Mn perlu Tulangan tunggal
fy 240
m = = = 11.294
0.85 x f 'c 0.85 x 25
Mu 539781.482
Rn = = = 0.055
Ø x b x d2 0.80 x 200 x 247 2
1 2 x m x Rn
r = x 1 - 1 -
m fy
1 2 x 11.294 x 0.055
r = x 1 - 1 -
11.294 240
r = 0.00023
Periksa :
r < rmin ( Digunakan Rasio Tulangan Minimum )
r < rmaks ( OK )
Hitung Luas Tulangan :
As = r x b x d
As = 0.006 . 200 . 247
As = 288.17 mm2

Digunakan Tulangan : 3 Ø 10 = 235.714 mm2

3 Ø 10

Balok BC
~ M (+) = 2387.983 kgm = 23879827.68 Nmm

d = h - 1/2 Ø tul. Utama - Ø Sengkang - d'

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
= 300.00 - 0.5 x 14 - 8 - 40
300 = 245.000 mm
Ø 8

Ø 14
200

Hitung :
1.4 1.4
rmin = = = 0.006
fy 240
0.85 x f 'c 600 0.85 x 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240
= 0.040
600 600
amaks = 0.75 x b1 x xd = 0.75 0.85 245
600 + fy 600 + 240
= 111.563
amaks
Mnada = 0.85 x f 'c x b x amaks x d -
2
111.6
= 0.85 x 25 x 200 x 111.6 x 245 -
2
= 89716296.387 Nmm
Mu 23879827.677
Mnperlu = = = 29849784.596 Nmm
Ø 0.8
Mn ada > Mn perlu Tulangan tunggal
fy 240
m = = = 11.294
0.85 x f 'c 0.85 x 25
Mu 23879827.677
Rn = = = 2.486
Ø x b x d2 0.80 x 200 x 245 2
1 2 x m x Rn
r = x 1 - 1 -
m fy
1 2 x 11.294 x 2.486
r = x 1 - 1 -
11.294 240
r = 0.01105
Periksa :
r > rmin ( OK )
r < rmaks ( OK )
Hitung Luas Tulangan :
As = r x b x d
As = 0.011 . 200 . 245
As = 541.434 mm2

Digunakan Tulangan : 3 Ø 14 = 462.000 mm2 3 Ø 14

~ M (+) = 1208.072 kgm = 12080718.88 Nmm

d = h - 1/2 Ø tul. Utama - Ø Sengkang - d'


= 300.00 - 0.5 x 10 - 8 - 40
300 = 247.000 mm
Ø 8

Ø 10
200

Hitung :
1.4 1.4
rmin = = = 0.006
fy 240
0.85 x f 'c 600 0.85 x 25 600
rmaks = 0.75 x b1 x = 0.75 0.85
fy 600 + fy 240 600 + 240

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
= 0.040
600 600
amaks = 0.75 x b1 x xd = 0.75 0.85 247
600 + fy 600 + 240
= 112.473
amaks
Mnada = 0.85 x f 'c x b x amaks x d -
2
112.5
= 0.85 x 25 x 200 x 112.5 x 247 -
2
= 91187030.841 Nmm
Mu 12080718.879
Mnperlu = = = 15100898.599 Nmm
Ø 0.8
Mn ada > Mn perlu Tulangan tunggal
fy 240
m = = = 11.294
0.85 x f 'c 0.85 x 25
Mu 12080718.879
Rn = = = 1.238
Ø x b x d2 0.80 x 200 x 247 2
1 2 x m x Rn
r = x 1 - 1 -
m fy
1 2 x 11.294 x 1.238
r = x 1 - 1 -
11.294 240
r = 0.00532
Periksa :
r < rmin ( Digunakan Rasio Tulangan Minimum )
r < rmaks ( OK )
Hitung Luas Tulangan :
As = r x b x d
As = 0.006 . 200 . 247
As = 288.167 mm2

Digunakan Tulangan : 3 Ø 10 = 235.714 mm2

3 Ø 10

VI.2. DIMENSI DAN PENULANGAN PONDASI TANGGA


Data - data :
~ Beban hidup (PL) = 29807.4 N
~ Beban mati (PD) = 41762.65 N
~ Dimensi kolom, hc = 250.00 cm
~ Dimensi kolom, bc = 250.00 cm
~ Kuat rencana beton, f 'c = 25 Mpa
~ Kuat leleh baja tulangan, fy = 240 Mpa
~ Daya dukung tanah, st = 0.15 Mpa
~ Dalam pondasi, Htot = 1 m = 1000 mm
~ Berat volume tanah urug, gt = 18000 N/m3
1.1. Perencanaan Dimensi Pondasi
q1 = H . gt = 1 x 18000 = 18000 N/m2 = 0.018 N/mm2
Taksir tebal slab (h) = 25 cm
q2 = h . g t = 0.25 x 18000 = 4500 N/m2 = 0.0045 N/mm2
snetto = st - q1 - q2 = 0.150 - 0.018 - 0.0045 = 0.1275 N/mm2
L = 1 s/d 2B diambil L = 1,5
Sehingga :
Ptotal ###
B x L = B x 1,5 . B =
snetto 0.128
1,5 . B2 = 561333.725
B = 611.737 mm = 650 mm
L = 1.5 x B = 975 mm
1.2 Kontrol Daya Dukung Tanah
qs = st = 0.150 Mpa
Pu + Af . ( q1 + q2 ) ### + 650 x 975 x 0.018 + 0.005
qsunetto = =
Af 650 x 975
= 0.135 Mpa

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Syarat :
qsunetto < qs Ok !!!
1.3 Tebal slab yang ditinjau dari geser dua arah
Syarat : Ø Vc > Vu
Dimana : Vc = ((hc + d) + (bc + d)) . 2 . d 1/3 f 'c
Vu = Af - (hc + d) . (bc + d) qsunetto
f = 0,60

bc + d
bc
hc

hc + d

Vc = ((hc + d) + (bc + d)) . 2 . d 1/3 f 'c


1
Vc = 250 + d + 250 + d x 2 x d x x 25
3
1
= 1000 x d + 4 x d 2 x x 25
3
= 1666.667 d + 6.667 d2
Vu = Af - (hc + d) . (bc + d) qsunetto

Vu = 611.7 x 975 + 250 + d x 250 + d x 0.135

= 596443.835 - 62500 + 500 d + d2 0.135


= ### - 67.716 d - 0.135 d2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
Syarat : Ø Vc > Vu
0.6 x 1666.667 d + 6.667 d2 ≥ ### - 67.716 d - 0.135 d2
1000 d + 4 >= 72312.57 - 67.716 d - 0.135 d 2

4.135 d2 + 1067.716 d - ### ≥ 0


Diambil 4.135 d2 + 1067.716 d - ### = 0
Diperoleh : d = 55.70699 mm = 56 mm
1.4 Tebal slab yang ditinjau dari geser satu arah

L hc
af = - - d
2 2

Bidang geser
1
bc = x 975 - 250 - d
2
hc = 362.500 - d

d
af

1
Vc = x f 'c x B x d
6
1
= x 25 x 611.737 x d
6
= 509.781 d
Vu = B . Af . Qsunetto
= 611.737 x ( 362.5 - d )x 0.135
= ### - 82.848 d
Syarat : Ø Vc > Vu
0.6 x ( 509.7811 d >= 30032.48 - 82.84822 d )
( 305.8686 d >= 30032.48 - 82.84822 d )
Diambil : ( 305.8686 d = 30032.48 - 82.84822 d )
388.7169 d = 30032.48
d = 77.261 mm = 80 mm
Dengan demikian, tebal slab pondasi (h) = d + d' = 80 + 50
= 130 mm
Kesimpulan hasil perhitungan :
~ Panjang slab pondasi L = 975
~ Lebar slab pondasi B = 650
~ Tebal slab pondasi h = 130
~ Tinggi efektif d = 80
~ Beton dekking d' = 50
1.5 Perhitungan luas tulangan
~ Tulangan arah panjang L
Syarat : Ø Mn ≥ Mu
As. Fy
Mn = As. x fy x d -
1,7 . F 'c . B
As. 240
= As. x 240 x 80 -
1.7 x 25 x 650
= 19200 As. - 2.085 As 2

1 dimana : Ly = 1/2 . ( L - hc )
Mu = x qsu netto x B x Ly2
2 1
= x 975 - 250
1 2
= x 0.135 x 650 x 362.5 2
2 = 362.500 mm
= 5783857.886619 Nmm
Syarat : Ø Mn ≥ Mu
0.8 x 19200 As. - 2.085 As2 ≥ 5783857.887
2.085 As2 - 19200 As. + 7229822.358 ≥ 0
Diambil : 2.085 As 2
- 19200 As. + 7229822.358 ≥ 0
Diperoleh :
As. = 724.597 mm
As min = r x b x d = 303.333
Digunakan Tulangan : 3 Ø 10 = 235.714 mm2
~ Tulangan arah pendek B

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II
As. Fy d = d - 1/2 . ( dtul 1 + dtul. 2)
0

Mn = As. x fy x d0 -
1,7 . F 'c . L = 80 - 0.5 12 + 12
As. 240 = 68 mm
= As. x 240 x 68 -
1.7 x 25 x 975
= 16320 As. - 1.390 As2
1 dimana : Lx = 1/2 . ( B - bc )
Mu = x qsunetto x L x Lx2
2 1
= x 650 - 250
1 2
= x 0.135 x 975 x 200 2
2 = 200 mm
= 2640905.384615 Nmm
Syarat : Ø Mn ≥ Mu
0.8 x 16320 As. - 1.390 As2 ≥ 2640905.384615
1.390 As 2
- 16320 As. + 3301131.730769 ≥ 0
Diambil : 1.390 As2 - 16320 As. + 3301131.730769 = 0
Diperoleh :
As. = 397.811 mm
Digunakan Tulangan : 3 Ø 12 = 339.429 mm2

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026


Struktur Beton II

350 cm

150 cm

30 cm

20 cm

Penulangan Tangga dan Pondasi Tangga

R i n a / DIII 98 062 Yuliana Inggita / DIII 98 026

Anda mungkin juga menyukai