E N G I N E E R I N G E S T I M A T E ( E.E ) - P E K E R J A A N S T R U K T U R
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
NDASI POMPA
SUB TOTAL :
RENCANA ANGGARAN BELANJA
PEKERJAAN STRUKTUR
A.2 LANTAI 2
1 Kolom K1
- Beton K-300 2.45
- Besi beton 600.68
- Bekisting 28.56
2 Kolom K2
- Beton K-300 2.45
- Besi beton 524.16
- Bekisting 28.56
3 Kolom K3
- Beton K-300 0.61
- Besi beton 135.16
- Bekisting 8.16
4 Kolom K4
- Beton K-300 7.34
- Besi beton 1,040.17
- Bekisting 85.68
5 Balok B.1
- Beton K-300 4.14
- Besi beton 946.12
- Bekisting 44.35
6 Balok B1.1
- Beton K-300 1.04
- Besi beton 222.48
- Bekisting 1.04
7 Balok B1.A
- Beton K-300 1.66
- Besi beton 401.50
- Bekisting 1.66
8 Balok B1.2
- Beton K-300 0.22
- Besi beton 44.44
- Bekisting 0.22
9 Balok B2
- Beton K-300 7.49
- Besi beton 1,416.77
- Bekisting 7.49
10 Balok B2.1
- Beton K-300 0.13
- Besi beton 32.12
- Bekisting 0.13
11 Balok B3.1
- Beton K-300 0.94
- Besi beton 253.31
- Bekisting 0.94
12 Pelat Beton Canopy Jendela t= 10 cm
- Beton K-300 4.84
- Besi beton 777.02
- Bekisting 32.85
13 Plat lantai 2 t=13 cm
- Beton K-300 38.79
- Besi beton 5,016.83
- Bekisting 262.55
14 Janggutan Beton
- Beton K-300 0.44
- Besi beton 43.54
- Bekisting 5.41
A.7 SOPI-SOPI
1 Kolom K4
- Beton K-300 0.68
- Besi beton 90.13
- Bekisting 7.95
2 Kolom K5
- Beton K-300 1.16
- Besi beton 176.87
- Bekisting 17.46
3 Balok B2.1
- Beton K-300 4.50
- Besi beton 562.80
- Bekisting 4.50
HARGA SATUAN
UNIT JUMLAH HARGA ( Rp. )
( Rp. )
M3 823,207.73 2,400,473.73
Kg 20,477.50 16,041,606.19
M2 204,835.00 6,968,486.70
-
M3 823,207.73 9,601,894.93
Kg 20,477.50 55,805,005.82
M2 204,835.00 27,873,946.80
-
M3 823,207.73 600,118.43
Kg 20,477.50 3,607,219.29
M2 204,835.00 1,990,996.20
-
M3 110,000.00 4,820,557.50
M3 196,720.00 5,747,273.16
M3 703,431.82 10,275,556.14
-
M3 110,000.00 1,002,292.50
M3 196,720.00 1,194,975.64
M3 703,431.82 2,136,498.29
-
M3 823,207.73 24,050,425.36
Kg 20,477.50 32,154,232.08
M2 204,835.00 1,788,209.55
-
M3 823,207.73 4,604,612.42
Kg 20,477.50 6,425,869.38
M2 204,835.00 1,751,339.25
-
M3 -
Kg -
M2 -
-
M3 823,207.73 2,844,209.45
Kg 20,477.50 11,360,419.38
M2 189,610.00 5,400,614.23
-
M3 823,207.73 88,906.43
Kg 20,477.50 781,196.56
M2 209,335.00 339,122.70
-
M3 823,207.73 4,098,586.63
Kg 20,477.50 16,393,134.54
M2 222,835.00 7,662,136.91
-
-
-
M3 823,207.73 2,015,212.52
Kg 20,477.50 12,300,346.30
M2 204,835.00 5,850,087.60
-
M3 823,207.73 2,015,212.52
Kg 20,477.50 10,733,549.80
M2 204,835.00 5,850,087.60
-
M3 823,207.73 503,803.13
Kg 20,477.50 2,767,748.60
M2 204,835.00 1,671,453.60
-
M3 823,207.73 6,045,637.55
Kg 20,477.50 21,300,094.22
M2 204,835.00 17,550,262.80
-
M3 823,207.73 3,411,372.82
Kg 20,477.50 19,374,078.59
M2 209,335.00 9,284,425.92
-
M3 823,207.73 852,843.21
Kg 20,477.50 4,555,885.80
M2 209,335.00 216,871.06
-
M3 823,207.73 1,364,466.81
Kg 20,477.50 8,221,803.40
M2 209,335.00 346,972.76
-
M3 823,207.73 181,105.70
Kg 20,477.50 910,066.22
M2 209,335.00 46,053.70
-
M3 823,207.73 6,164,179.46
Kg 20,477.50 29,011,993.91
M2 209,335.00 1,567,500.48
-
M3 823,207.73 102,900.97
Kg 20,477.50 657,679.64
M2 209,335.00 26,166.88
-
M3 823,207.73 769,699.23
Kg 20,477.50 5,187,104.74
M2 209,335.00 195,728.23
-
M3 823,207.73 3,987,453.59
Kg 20,477.50 15,911,388.25
M2 222,835.00 7,321,199.36
-
M3 823,207.73 31,931,733.82
Kg 20,477.50 102,732,144.52
M2 222,835.00 58,505,663.50
-
M3 823,207.73 359,577.14
Kg 222,835.00 9,701,618.65
M2 -
-
-
-
M3 823,207.73 317,099.62
Kg 222,835.00 17,528,085.58
M2 204,835.00 1,052,032.56
-
M3 823,207.73 5,919,192.84
Kg 222,835.00 213,586,615.89
M2 204,835.00 17,183,198.48
-
M3 823,207.73 563,732.65
Kg 222,835.00 23,330,922.90
M2 204,835.00 2,104,065.12
-
M3 823,207.73 1,613,487.15
Kg 222,835.00 105,413,815.25
M2 209,335.00 4,454,648.80
-
M3 823,207.73 713,103.69
Kg 222,835.00 43,165,196.71
M2 209,335.00 1,979,262.43
-
M3 823,207.73 5,862,268.03
Kg 222,835.00 231,820,493.54
M2 209,335.00 15,521,143.58
-
M3 823,207.73 164,641.55
Kg 222,835.00 7,156,832.70
M2 209,335.00 523,337.50
-
M3 823,207.73 7,008,790.59
Kg 222,835.00 540,376,696.72
M2 -
-
M3 823,207.73 3,434,011.03
Kg 222,835.00 48,976,551.46
M2 -
-
M3 823,207.73 408,722.64
Kg 222,835.00 10,350,041.76
M2 -
-
-
-
M3 823,207.73 11,565,245.36
Kg 222,835.00 575,641,022.69
M2 209,335.00 35,668,590.65
-
M3 823,207.73 164,641.55
Kg 222,835.00 7,156,832.70
M2 209,335.00 523,337.50
-
-
-
M3 823,207.73 561,098.39
Kg 222,835.00 20,083,092.44
M2 204,835.00 1,628,847.92
-
M3 823,207.73 958,213.79
Kg 222,835.00 39,413,134.85
M2 204,835.00 3,576,419.10
-
M3 823,207.73 3,704,434.77
Kg 222,835.00 125,411,623.57
M2 209,335.00 942,007.50
-
-
M2 276,227.74 108,437,124.54
-
E N G I N E E R I N G E S T I M A T E (E.E
PEKERJAAN STRUKTUR
HARGA SATUAN
VOLUME UNIT JUMLAH HARGA ( Rp. )
( Rp. )
1.00 LS
820.00 M'
82.00 Nos
2.00 TTk
0.25 M3
26.78 Kg
2.00 M2
3.00 M'
279.96 Kg
17.00 M2
11.25 M3
700.69 Kg
41.68 M2
12.13 M3
3,667.59 Kg
121.28 M2
0.95 M3
11.40 M3
39.60 M3
13.69 M3
0.05 M3
0.60 M3
1.29 M3
3.42 M3
0.03 M3
0.30 M3
0.59
1.71 M3
35.06 M3
5.94 M3
1.15 M3
0.58 M3
11.50 M2
1.78 M3
2.46 M3
1.24 M3
492.40 Kg
9.94 M2
1.73 M3
134.23 Kg
2.13 M2
23.04 M3
2.40 M3
1.20 M3
0.80 M3
118.37 Kg
3.20 M2
0.24 M3
149.14 Kg
2.40 M2
4.84 M2
0.73 M3
88.78 Kg
1.32 M2
0.86 M3
191.27 Kg
13.80 M2
0.37 M3
117.18 Kg
4.62 M2
1.22 M3
267.31 Kg
11.74 M2
30.10 M3
1.40 M3
3.96 M3
0.70 M3
2.10 M3
165.08 Kg
3.30 M2
1.68 M3
91.42 Kg
2.64 M2
REKAPITULASI
E N G I N E E R I N G E S T I M A T E ( E.E ) - P E K E R J A A N P E R S I A P A N D A N S M K 3
UN TA. 2020
5 P3K
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) Ls
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter, dll); Ls
TOTAL
30.00 1
30.00 1
8.00 1
5.00 1
3.00 1
1.00 1
1.00 1
1.00 1
1.00 1
1.00 1
30.00 1
9 1
6.00 1
9.00 1
30.00 1
9.00 1
9.00 1
30.00 1
3 1
30.00 1
3 1
1.00 1
1.00 1
1.00 1
2.00 1
1.00 1
1.00 1
1.00 1
1.00 1
1.00 1
1.00 1
KEGIATAN :
PEMBANGUNAN DAN REHABILITASI GEDUNG KANTOR LINTAS SKPD PEK
ERTINGG: PEMBANGUNAN AULA SMPN 3 SIDOARJO
LOKASI :
KEC. SIDOARJO KAB. SIDOARJO
HARGA
NO SAT. SATUAN ( Rp )
1 2 3 4 5
A LOKASI 1 GUDANG
I PEKERJAAN PERSIAPAN
1 Pembongkaran dinding tembok bata akibat bongkar kusen 4.85 m3 Rp
Juml
ah :
II PEKERJAAN TANAH
1 Urugan Sirtu padat 8.08 m3 Rp
Juml
ah :
III PEKERJAAN BETON
1 Balok Latai 10/15
Pekerjaan Beton K - 300 0.32 m3 Rp
Pekerjaan Pembesian Besi D-8 Begel D-6 64.00 kg Rp
IV PEKERJAAN PASANGAN
1 Pasang Bata Merah 1 : 5 akibat Bongkaran 4.85 m2 Rp
2 Plesteran biasa 1 : 5 86.20 m2 Rp
3 Pekerjaan Acian 86.20 m2 Rp
B LOKASI 2 AULA
I PEKERJAAN PERSIAPAN
1 Pembongkaran Plat Beton sbg Jalan Pipa 0.30 m3 Rp
Juml
II PEKERJAAN PASANGAN ah :
1 Pekerjaan Dinding luar aula t. 1,5 m bata merah 1 : 5 38.40 m2 Rp
2 Pekerjaan Dinding Kamar Mandi bata merah 1 : 5 27.48 m2 Rp
3 Plesteran biasa 1 : 5 5.36 m2 Rp
4 Pekerjaan Acian Dinding 5.36 m2 Rp
Juml
III PEKERJAAN LANTAI DAN KERAMIK ah :
1 Rabat lantai 5 cm 6.38 m3 Rp
2 Pasang Keramik lantai 40 x 40 cm 127.60 m2 Rp
3 Pasang Keramik dinding 60 x 30 cm 113.23 m2 Rp
Juml
IV PEKERJAAN KUSEN DAN PENGGANTUNG ah :
1 Pasang Kusen Pintu dan Jendela Alumunium coklat 4" 58.80 m1 Rp
2 Pasang daun Pintu WPC Board 2.00 bh Rp
3 Pasang Daun Jendela Alumunium Kaca 5.04 m2 Rp
4 Pasang jalusi Alumunium 54.00 m1 Rp
OARJO
HARGA JUMLAH
SATUAN ( Rp ) HARGA ( Rp )
5 6
499990 Rp 2424951.5 -
Juml Rp -
ah :
218000 Rp 1761440 -
Juml Rp -
ah :
823207.72727 Rp 263426.4727273
- Rp -
209335 Rp -
314002.5
Juml Rp -
ah :
166200 Rp 806070 -
44384 Rp 3825900.8 -
27650 Rp 2383430 -
Juml Rp -
ah : 7015400.8
- Rp -
149335 Rp 4032045 -
Juml Rp -
ah :
231760.15 Rp -
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
Juml Rp -
ah :
25218.098 Rp -
Juml Rp -
ah :
OTAL PEKERJAAN LOKASI 1 Rp -
- Rp -
Juml Rp -
ah :
166200 Rp 6382080 -
166200 Rp 4567176 -
44384 Rp 237898.24 -
27650 Rp 148204 -
Juml Rp 11335358.24 -
ah :
- Rp -
- Rp 4032045 -
- Rp -
Juml Rp -
ah :
- Rp -
- Rp -
- Rp -
- Rp -
JADWAL WAKTU PELAKSANAAN
KEGIATAN : Konstruksi fisik pasar kasin
PEKERJAAN : Revitalisasi Pasar
LOKASI : Pasar Kasin - Malang
TAHUN ANGGARAN : 2020
NO JENIS PEKERJAAN JADWAL WAKTU PELAKSANAAN
BOBOT (%) Bulan K-1 Bulan K-2 Bulan K-3 Bulan K-4 Bulan K-5 Bulan K-6
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4
A. PERSIAPAN
I. PEKERJAAN PERSIAPAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah #REF!
Progres rencana #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Komulatif Rencana 0.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
KODE URAIAN SATUAN HARGA
Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kedung Kecamatan
Kecamatan Lowokwaru
Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kandang Klojen
Badung Kel.
Pisang Candi Badung Gadang Bndulan Bandulan Kel. Kel. Arjosari Kd. Baleajosari Kel. Kel. Kel. Jodipan Kel.Bumiayu
Mulyorejo Kebonsari Kebonsari Kebonsari Tejosari Tanjung Tejo Tunjungrejo Mulyorejo Kebonsari Tulusrejo Mulyoagung Mulyoagung Dinoyo Tunggulwulung Tlogomas Merjosari Kec. Lowok Kd. Polowijen Kel. Arjosari Kd. Baleajosari Kel. Kesatrian Kel. Bunulrejo Kel. Polehan Kel. Kejalrian Kel. Bunud Purwantoro Kel polowijen Jl. Rais (UD. Kel. Bumiayu (Mitra Mangliawan Pakis Kel. Tlogowaru (Ud. Kel. Arjowinangan Arjowinangun (Akbar Bareng ( Kawi
KODE NAMA BAHAN SATUAN HARGA 2018 Kec.Sukun Tejosari (Rajawali (Makmur Jaya (Sumber Kel. Tlogowaru UD. Ringin Agung Toko Masjhur Purwantoro (Tb. Mangun (Tb Utama Pandanwangi Pandanwangi Kota Lama Kec.Kedung Kandang Toko Cahaya Alam
(Makmur Jaya) (Sader Jaya) (Tunggul Jaya) (Masjhur) Kec.Sukun (Bedak Willys) (Mirah Rejeki) (Berkah Abadi) (Mely Jaya 2) Dinoyo Tasik Madu Tasik Madu Tulusrejo Mojolangu Jatimulyo (Prakasa Jatimulyo Lowokwaru Lowokwaru Merjosari Dinoyo (Sinar Dawuh (Ud. Merjosari (Ud.Atika Merjosari (TB Mandiri (Mat ahari) (Mayang Tunjung Sekar Tunjung Sekar Waru (AJ) (Kendedes) (SumberJaya) (Tb Barokah) (Rezza Jaya) (Sumber Alam) (Horas Jaya) (Moza I I) (Arjosari Jaya) (Manis (molyo) Djawa Baru) Karya) (R.J.A) Bumi Prakasa) (Anugrah) Jaya) Jaya)
(Rizky) (Rizky) Jaya) Abadi) Barokah) (Cahaya Alam) Berjaya) Jaya) (Gio Jaya) (Jati Utomo) (Ud. Koesnadi) (MJ)
(Supralon) (Ahmad Ning) (Bangun Jaya) (Budi Jaya) (Usaha Jaya) (Cahaya Alam) (Mulyo Joyo) Lunas) (Sederhana) (Mawar) (Ud.Cempaka) (Abadi) (Dinoyo Jaya) Sengkaling) Sidomakmur) (Barokah) Jaya) (LAM) Jaya) Grand) (Nona Jaya) (Tb Gemilang) Sentosa)
M.001 Pasir Urug m3 145,600.00 150,000.00 125,000.00
M.001.a Pasir m3 189,000.00 325,000.00 100,000.00 272,000.00
M.001.b Pasir Halus (untuk HRS)) m3 315,000.00
M.001.c Pasir Urug (Ada Unsur Lempung) m3 121,500.00
M.002 Pasir Beton m3 288,689.75 250,000.00 270,000.00 250,000.00 230,000.00 200,000.00 240,000.00 200,000.00 250,000.00 250,000.00 330,000.00 230,000.00 250,000.00 350,000.00 250,000.00 250,000.00 350,500.00 270,000.00 300,000.00 350,000.00 280,000.00 300,000.00 301,000.00 350,000.00 350,000.00 265,000.00 290,000.00 285,000.00 290,000.00 300,000.00 260,000.00 260,000.00 320,000.00 250,000.00 276,000.00 270,000.00 280,000.00 270,000.00 250,000.00 260,000.00 250,000.00 285,000.00 250,000.00 300,000.00 250,000.00 250,000.00 300,000.00 250,000.00 250,000.00 260,000.00 250,000.00 250,000.00 280,000.00 250,000.00
M.002.a Pasir Beton kg 206.21 178.57 192.86 178.57 164.29 142.86 171.43 142.86 178.57 178.57 235.71 164.29 178.57 250.00 178.57 178.57 250.36 192.86 214.29 250.00 200.00 214.29 215.00 250.00 250.00 189.29 207.14 203.57 207.14 214.29 185.71 185.71 228.57 192.86 200.00 192.86 178.57 185.71 178.57 203.57 178.57 214.29 178.57 178.57 214.29 178.57 178.57 185.71 178.57 178.57 200.00 178.57
M.003 Pasir Pasang m3 277,136.43 115,000.00 120,000.00 150,000.00 130,000.00 105,000.00 120,000.00 120,000.00 115,000.00 125,000.00 150,000.00 120,000.00 200,000.00 130,000.00 190,000.00 125,000.00 150,000.00 174,000.00 120,000.00 175,000.00 175,000.00 150,000.00 150,000.00 165,500.00 170,000.00 160,000.00 115,000.00 180,000.00 140,000.00 150,000.00 165,000.00 140,000.00 800,000.00 210,000.00 120,000.00 160,000.00 160,000.00 160,000.00 160,000.00 160,000.00 150,000.00 150,000.00 200,000.00 160,000.00 160,000.00 150,000.00 150,000.00 100,000.00 120,000.00 160,000.00 150,000.00 160,000.00 130,000.00 120,000.00
M.003.a Pasir Pasang kg 197.96 82.14 85.71 107.14 92.86 75.00 85.71 85.71 82.14 89.29 107.14 85.71 142.86 135.71 89.29 107.14 124.29 85.71 125.00 125.00 107.14 107.14 118.21 121.43 114.29 82.14 128.57 100.00 107.14 117.86 100.00 571.43 85.71 114.29 114.29 114.29 114.29 114.29 107.14 107.14 142.86 114.29 114.29 107.14 107.14 71.43 85.71 114.29 107.14 114.29 92.86
M.003.b Pasir Cor m3 283,815.00 290,000.00 350,000.00 345,000.00 255,000.00 325,000.00 140,000.00 180,000.00 280,000.00
M.003.c Pasir Silika Kg 16,100.00
M.004 Sirtu m3 192,886.61 170,000.00 250,000.00
M.005 Bahan Timbunan m3 107,625.00
M.005.a Timbunan pasir m3 133,350.00
M.005.b Timbunan Porus m3 150,150.00
M.005.c Timbunan Porus m3 150,150.00
M.005.d Bahan Tanah Timbunan m3 85,400.00
M.006 Sewa pasir m3 55,335.00
M.007 Tanah Liat m 3
89,670.00
M.008 Tanah Timbun m3 128,730.00
M.008.a Tanah Urug Taman/Katel m3 112,875.00
M.009 Galian tanah biasa m3 56,700.00
M.010 Kapur m3 2,118,375.00 6,000.00 6,500.00 7,000.00 6,000.00 4,500.00 40,000.00 3,000.00
M.010.a Kapur Padam m3 541,170.00 299,000.00 500,500.00 300,000.00
M.010.b Kapur Sirih kg 13,200.00 3,000.00 3,500.00
M.011 Batu belah m3 228,281.85 125,000.00 250,000.00
M.011.a Batu belah Wire mesh 5 mm ulir m3 303,975.00
M.011.b Batu 1 kg - 3 kg m3 303,975.00
M.011.c Batu 3 kg - 5 kg m3 303,975.00
M.011.d Batu 5 kg - 10 kg m3 228,281.85
M.011.e Batu 10 kg - 30 kg m3 228,281.85
M.011.f Batu 30 kg - 50 kg m3 228,281.85
M.011.g Batu 50 kg - 100 kg m3 228,281.85
M.011.h Batu 100 kg - 200 kg m3 228,281.85
M.011.i Batu 200 kg - 300 kg m3 228,281.85
M.011.j Batu 200 kg - 500 kg m3 228,281.85
M.011.k Batu 300 kg - 400 kg m3 228,281.85
M.011.l Batu 400 kg - 500 kg m3 228,281.85
M.011.m Batu 500 kg - 650 kg m3 228,281.85
M.011.n Batu 650 kg - 800 kg m3 228,281.85
M.011.o Batu Kali m3 221,600.00 340,000.00 325,000.00 330,000.00
M.011.p Batu Belah Kali m3 217,100.00 340,000.00 325,000.00 115,000.00 280,000.00
M.012 Batu candi m2 116,300.00 65,000.00 65,000.00
M.013 Batu Granit kg 27,900.00 120,000.00
M.014 Batu muka m2 62,580.00
M.015 Batu Paras bh 1,995.00
M.015.a Batu Palimanan m2 126,000.00
M.015.b Batu Ampyangan Granit Kg 10,100.00
M.015.c Batu Apung kg 57,750.00
M.016 Batu Pecah m3 261,975.00 180,000.00
M.016.a Stenslah/batu pecah tangan 2/3 m3 303,975.00 250,000.00
M.016.b Batu pecah mesin 2/3 m3 301,455.00 257,000.00 325,000.00 225,000.00 240,000.00 245,000.00 256,000.00 260,000.00 250,000.00
3
M.016.c Batu pecah mesin 1/1 m 347,051.25 265,500.00 225,000.00 240,000.00 245,000.00 265,000.00 260,000.00
M.016.d Batu pecah mesin 1/2 m3 298,725.00 160,000.00 266,000.00 225,000.00 240,000.00 265,000.00 260,000.00
M.017 Batu tempel hitam bh 128,100.00 260,000.00
M.018 Batu Traso kg 15,288.00
M.019 Batu Kerikil (maks 30 mm) kg 150.97
M.020 Kerikil kg 275,625.00 225,000.00
M.020.a Kerikil (maks 30 mm) m3 271,740.00
M.020.b Kerikil (2cm/3cm) m3 247,590.00
M.021 Koral m3 326,025.00 220,000.00 230,000.00 260,000.00 240,000.00 210,000.00 240,000.00 235,000.00 280,000.00 275,000.00 250,000.00 230,000.00 335,000.00 250,000.00 300,000.00 299,500.00 270,000.00 280,000.00 300,000.00 250,000.00 340,000.00 300,000.00 266,500.00 325,000.00 325,000.00 225,000.00 190,000.00 240,000.00 245,000.00 250,000.00 265,000.00 280,000.00 260,000.00 260,000.00 250,000.00 250,000.00 270,000.00 250,000.00 280,000.00 280,000.00 240,000.00 250,000.00 250,000.00 250,000.00 260,000.00 250,000.00
M.021.a Koral Beton m3 281,029.41 250,000.00 530,000.00 360,000.00 330,000.00 300,000.00 260,000.00 300,000.00 250,000.00 260,000.00 250,000.00 240,000.00 250,000.00 230,000.00 250,000.00 240,000.00
M.022 Bata merah bh 1,575.00 550.00 530.00 550.00 510.00 590.00 540.00 550.00 550.00 550.00 550.00 550.00 520,000.00 540.00 551.00 550.00 560.00 550.00 550.00 650.00 625.00 550.00 540.00 550.00 550.00 590.00 560.00 570.00 550,000.00 580.00 600.00 550.00 500.00 550,000.00 550.00 600.00 580.00 520.00 550.00 570.00 550.00 550.00 520.00 625.00 600.00 570.00 550.00 570.00 540.00 480.00 530.00 550.00 550.00 470.00 470.00 510.00
M.022.a Bata Merah m3 561,750.00 520,000.00 600.00 520,000.00 580,000.00 550,000.00
M.022.b Batu Bata Tahan Api bh 21,500.00 3,500.00
M.023 Bata Rooster m3 2,771,370.00 2,665,000.00 2,665,000.00 2,665,000.00 2,870,000.00 2,460,000.00 2,870,000.00 2,460,000.00 2,665,000.00 2,870,000.00 2,870,000.00
M.023.a Bata Rooster bh 22,170.96 6,500.00 6,500.00 40,000.00 15,000.00 13,000.00 5,500.00 10,000.00 8,000.00 10,000.00 10,000.00 5,000.00 6,000.00 4,000.00
M.024 Bata Berongga m3 505,470.00 7,000.00
M.024.a Bata Berongga bh 15,225.00 9,000.00
M.025 Bata Ringan tebal 7,5 cm m3 966,000.00 700,000.00 750,000.00 750,000.00 710,000.00 720,000.00 740,000.00 670,000.00 700,000.00 700,000.00 680,000.00 650,000.00 710,000.00
M.025.c Bata Ringan tebal 10 cm bh 11,784.03 8,433.73 750,000.00 8,554.22 10,000.00 10,000.00 10,000.00 720,000.00 700,000.00 8,433.73 9,036.14 8,433.73 8,192.77 7,831.33 8,132.53 8,433.73 7,831.33 8,433.73
M.026 Bata Pelapis bh 787,500.00 650.000 / m3 750,000.00 700.000 / m3
M.027 Paving block 6 cm natural m2 76,781.25 55,000.00 68,500.00 67,500.00 60,000.00 55,000.00 60,000.00 48,000.00 50,000.00 50,000.00 55,000.00 50,000.00 60,000.00 50,000.00 40,000.00 60,000.00
M.027.b Paving block 8 cm natural m2 79,800.00 42,000.00 65,000.00 60,000.00 70,000.00 70,000.00 50,000.00 65,000.00 50,000.00 60,000.00 50,000.00 55,000.00 70,000.00 55,000.00 55,000.00 35,000.00
M.027.c Paving block segi enam natural bh 3,465.00 2,040.00 2,400.00 2,800.00 2,800.00 2,600.00
M.027.d Paving block segi enam warna bh 3,570.00 2,000.00 2,400.00 3,000.00 2,800.00 2,600.00 2,200.00
M.028 Paving block 6 cm berwarna m2 78,750.00 2,000.00 55,000.00 70,000.00 60,000.00 50,000.00 60,000.00
M.028.a Paving block 8 cm berwarna m2 84,000.00 60,000.00 75,000.00 70,000.00 60,000.00 50,000.00 60,000.00 50,000.00 60,000.00 40,000.00
M.028.b Paving Block K 300, t=6 cm m2 682,500.00 650,000.00
M.028.c Paving Block Tiga Berlian biasa bh 3,150.00
M.028.d Paving Block Tiga Berlian warna bh 3,360.00
M.028.e Paving Stone t 6 cm 20 x 20 cm K-300 m2 67,300.00
M.028.f Paving Stone t 6 cm 10 x 20 cm K-300 m2 73,200.00
M.028.g Paving Stone t 8 cm K-300 m2 78,500.00
M.028.h Paving Stone t 8 cm K-300 m2 78,500.00
M.029 Chipping m3 322,140.00 250,000.00
M.029.a Chipping (kg) Kg 210.00
M.030 Portland Cement (PC) kg 1,575.00 1,125.00 0.00 1,150.00 1,125.00 1,150.00 1,150.00 0.00 1,100.00 0.00 1,175.00 1,137.50 1,150.00 1,150.00 0.00 51,000.00 1,187.50 1,150.00 1,137.50 1,250.00 1,137.50 1,187.50 1,200.00 1,150.00 1,150.00 0.00 1,137.50 1,162.50 1,150.00 1,175.00 1,150.00 1,125.00 2,000.00 1,150.00 2,500.00 1,175.00 1,162.50 1,150.00 51,000.00 2,500.00 1,037.50 0.00 1,150.00 0.00 0.00 1,150.00 0.00 0.00 1,125.00 1,175.00 1,425.00 1,200.00 0.00 1,150.00 0.00 1,150.00 1,150.00 1,125.00 1,150.00 1,125.00 1,150.00 1,150.00 51,000.00 1,150.00
M.030.a Portland Cement (PC) Warna kg 23,200.00 15,000.00 16,000.00
M.030.b Semen merah kg 105.00 1,500.00 11,000.00
M.030.c Semen Grout kg 23,200.00 42,000.00 42,000.00 42,000.00 42,000.00 41,000.00 43,000.00 43,000.00 44,000.00 42,500.00 43,000.00 43,000.00 41,500.00 41,500.00 42,500.00 42,000.00 43,000.00 45,000.00 42,500.00 43.500 / sak 43,000.00 43.000 / sak 45.000 / sak 45.000 / sak 43,000.00 43,000.00 44,000.00 44,000.00 45.500 / sak 46.000 / sak 43,000.00 46,000.00 46,000.00 43.000 / sak 44,500.00 43,000.00 45,000.00 55,000.00 45,000.00 42,000.00 46,000.00 41,000.00 43,000.00 41,000.00 42,500.00 41,000.00 43.000 / sak
M.030.d Semen Merah m3 281,400.00 75,000.00 44,000.00 43,000.00 43,000.00 42,500.00 40,000.00 40,000.00
M.030.e Portland Cement (PC) Tahan Api kg 9,400.00
M.030.f Portland Cement (PC) 40kg zak 103,000.00
M.030.g Semen Warna Kg 11,000.00 11,000.00
M.031 Arbocell kg 18,375.00
M.032 Mortar siap pakai (MSP) kg 108,675.00 75,000.00
M.033 Hollow Block (HB. 10) bh 6,100.00
M.033.a Hollow Block (HB. 15) bh 7,507.50
M.033.b Hollow Block (HB. 20) bh 8,489.25
M.033.c Hollow Aluminium kg 63,000.00 21,000.00
M.033.d Hollow Block (HB. 20) bh 8,489.25
M.033.e Hollow Block (HB. 15) bh 7,400.00
M.033.f Hollow Block (HB. 10) bh 6,468.00
M.034 Rangka Metal Hollow 40.40.2 mm m' 43,785.00 96,000.00
M.035 Besi Hollow kg 29,531.25 25,500.00 18,907.56 18,907.56
M.036 Besi angker diameter 8 kg 46,852.83 48,000.00 42,000.00 45,000.00 40,000.00 45,000.00 47,000.00 45,000.00 47,000.00 42,500.00 44.000 / ljr 38,000.00 35.000 / ljr 43,000.00 45,000.00 65,000.00 47,500.00 37,500.00 47,000.00 42,500.00 46,000.00 42,800.00 38,500.00 45.000 / ljr 45,000.00 42,000.00
M.037 Besi beton Polos kg 16,380.00 11,845.73 15,151.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17,906.34 0.00 0.00 11,845.73 18,732.78 0.00 18,732.78 18,595.04 21,625.34 0.00 10,468.32 0.00 0.00 17,906.34 0.00 12,396.69 12,121.21 0.00 0.00 0.00 26,000.00 17,906.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,283.75 26,170.80 18,595.04 15,151.52 0.00 20,110.19 17,906.34 18,457.30 18,347.11 15,427.00 17,906.34 19,283.75 14,325.07 0.00
M.037.a Besi beton Ø 12 mm m 9,135.00 7,916.67 7,250.00 0.00 7,750.00 7,916.67 7,791.67 0.00 7,708.33 0.00 8,083.33 7,958.33 7,500.00 7,791.67 0.00 7,916.67 0.00 8,166.67 7,833.33 7,958.33 8,041.67 7,916.67 5,000.00 7,958.33 7,416.67 7,833.33 7,875.00 7,916.67 0.00 7,916.67 8,916.67 8,000.00 7,500.00 0.00 7,879.92 92,000.00 103,000.00 7,833.33 7,916.67 7,500.00 0.00 7,416.67 6,833.33 0.00 0.00 7,916.67 7,916.67 8,125.00 7,291.67 0.00 8,583.33 7,083.33 7,410.88 9,166.67 8,033.33 7,250.00 8,000.00 8,333.33 8,333.33 0.00
M.037.b Besi beugel : 0,005 x 0,05 x 500 kg 31,100.00 19,000.00 260,000.00
M.037.c Besi Beton Ulir kg 24,386.25 16,554.05 15,540.54 59,459.46 95,000.00 125,000.00 16,216.22 14,864.86 9,189.19 21,621.62
M.038 Besi Lis Kaca (1x1) cm m 18,060.00 6,550.00 5,000.00 6,500.00 6,000.00 8,000.00 6,000.00 6,000.00 4,500.00 6,500.00 6,500.00 7,000.00 7,000.00 5,400.00 13,000.00
M.039 Besi pengaku kg 147,000.00 140,000.00
M.039.a Besi pengaku dari profil siku kg 189,000.00 180,000.00
M.040 Besi Strip kg 14,982.45 40,000.00
M.040.a Besi Strip kg 14,982.45
M.040.b Besi Strip tebal 5 mm kg 14,982.45
M.041 Besi Scuare tube m 43,785.00
M.042 Besi Siku L 30.30.3 kg 29,531.25 6,127.45 0.00 0.00 13,774.10 0.00 13,774.10 0.00 41,322.31 0.00 14,187.33 13,774.10 14,049.59 14,049.59 0.00 13,774.10 0.00 0.00 14,462.81 13,774.10 14,049.59 14,325.07 13,911.85 14,187.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00 0.00 0.00 65,000.00 0.00 0.00 20,661.16 0.00 17,906.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,774.10 0.00 0.00 0.00 0.00 0.00 0.00
M.042.a Besi siku L.50.50.5 kg 29,531.25 5,952.38 0.00 0.00 36,363.64 0.00 35,812.67 0.00 35,812.67 0.00 37,603.31 36,914.60 37,465.56 37,741.05 0.00 35,812.67 0.00 0.00 36,639.12 0.00 35,812.67 36,088.15 37,603.31 36,914.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,283.75 0.00 0.00 0.00 16,528.93 0.00 0.00
M.043 Besi Profil kg 29,531.25
M.044 Profil siku kg 29,531.25
M.045 Pelat Setrip / 3x30x300 mm kg 29,531.25
M.046 Besi Plat Baja kg 27,400.00
M.046.a Besi plat baja tebal 2 mm m2 465,465.00
M.046.b Besi plat baja tebal 3 mm m3 577,500.00
M.047 Besi Baja IWF kg 29,531.25
M.048 Tulangan praktis 120 kg/m3 kg 1,965,600.00
M.049.a Wire Mesh M6 Asli m2 66937.5
M.050 Frame besi L30.30.3 kg 29,531.25
M.051 Pembesian kg 16,380.00
M.052 Baja Tulangan kg 16,380.00
M.052.a Baja Tulangan untuk Dowel D3 kg 16,380.00
M.052.b Baja Tulangan Polos U 24 kg 16,380.00
M.052.c Baja Tulangan (Ulir) D32 Kg 24,386.25
M.052.d Baja Tulangan (Polos) U32 Kg 19,530.00
M.052.e Baja Tulangan (Ulir) D39 Kg 24,386.25
M.052.f Baja Tulangan (Ulir) D48 Kg 27,536.25
M.053 Baja profil L.40.40.4 m 74,182.50
M.053.a Baja profil L.50.50.5 kg 29,531.25
M.053.b Turap Baja Profil Larsen lebar 350 mm m 682,500.00
M.053.c Turap Beton Bertulang pre-cast 30x12 cm m 262,500.00
M.053.d Turap Beton Bertulang pre-cast 40x15 cm m 341,250.00
M.053.e Baja Profil kg 29,531.25
M.053.f Baja Clips & Adjustable kg 29,531.25
M.053.g Baja Struktur kg 29,531.25
M.054 Baja strip (0,2 x 2) cm kg 17,230.50
M.054.a Baja Bergelombang kg 17,230.50
M.054.b Baja Prategang Kg 24,386.25
M.054.d Baja Ringan kg 66,500.00
M.055 PCI Girder L=17m Buah 127,050,000.00
M.055.a PCI Girder L=21m Buah 138,600,000.00
M.055.b PCI Girder L=26m Buah 173,250,000.00
M.055.c PCI Girder L=32m Buah 218,295,000.00
M.055.d PCI Girder L=36m Buah 233,541,000.00
M.055.e PCI Girder L=41m Buah 268,800,000.00
M.056 Kayu m3 5,011,125.00
M.056.a Kayu untuk landasan Ls 4,935,000.00
M.056.b Kayu untuk dinding spul bak sirkulasi Ls 2,625,000.00
M.057 Balok Kayu m3 4,966,500.00 8,500,000.00
M.057.a Kayu Usuk 5/7 (Balok Bekisting Biasa) m3 4,966,500.00 4000 m3 5,000.00 4,500.00 4000 m3 5,000,000.00 80,000.00
M.057.b Kayu Usuk 5/7 kelas III m3 7,450,065.00 60,000.00 36,000.00
Balok Kayu Kelas I 125,000.00
M.057.c Balok Kayu, 6 x 12 m3 21,787,500.00 115.000 / lj 140,000.00 45,000.00 145,000.00 145.000 / ljr (4m) 115,000.00 116,500.00 114,000.00 160.000 / lonjor 114,500.00 450.000 / m3 5000 / m3 135,000.00 149,000.00 55,500.00 117.000 / ljr 5,000.00 5500 m3 45,000.00 112,500.00 141,000.00 150,000.00 125,000.00 141.000 / lonjor 97,000.00 135.000 / lonjor 130.000 / batang 140,000.00 165,000.00 135.000 / lonjor 4x1 42.000 / lonjor 7,500,000.00 260,000.00 115,000.00 140,000.00 125,000.00 40,000.00 120,000.00 145,000.00 130,000.00 135,000.00 135,000.00 135.000 / m 4,500,000.00 120,000.00 95,000.00 95,000.00 120,000.00 125,000.00
M.057.d Balok kayu 8/12 m1 209,160.00 150,000.00 180,000.00 35,000.00 175,000.00 150,000.00 150,000.00 149,500.00 151,500.00 180,000.00 152,500.00 150,000.00 199,000.00 4,500.00 155,000.00 6,000.00 5000 m3 10,000.00 148,500.00 175,500.00 200,000.00 175,000.00 175,000.00 107,000.00 150,000.00 157,000.00 175,000.00 220,000.00 185,000.00 280,000.00 365,000.00 165,000.00 170,000.00 162,000.00 27,500.00 180,000.00 160,000.00 165,000.00 175,000.00 130,000.00 125,000.00 80,000.00 170,000.00 150,000.00
M.057.e Balok kayu 8/12 m3 21,787,500.00 5000 / m3 7,000.00 6,500.00 6500 m3 155,000.00 185,000.00 15.000 / lonjor 9,500,000.00 160.000 / m
Balok Kayu Kelas II
M.057.f Balok Kayu, 6 x 12 m3 14,293,860.00 105,000.00 120,000.00 165,000.00 6,500,000.00 216,000.00 117,000.00
M.057.g Balok kayu 8/12 m 142,170.00 145,000.00 150,000.00 220,000.00 290,000.00 155,000.00
M.057.h Balok kayu 8/12 m3 14,293,860.00 7,500,000.00
M.057.i Balok Kayu, 6 x 12 m3 8,353,380.00
M.057.j Balok kayu 8/12 m 80,192.45
M.057.k Balok kayu 8/12 m3 8,353,380.00
M.058 Balok Kayu Kelas II m3 14,293,860.00
M.058.a Balok Kayu Kelas III m3 8,353,380.00
M.059 Kayu Balok Borneo m3 12,958,050.00
M.059.b Usuk : 5/7 m3 12,958,050.00 15.000-65.000 57,000.00
M.059.c Papan (2x20) cm m3 15,836,047.50 75,000.00 82,000.00 80,000.00 75,000.00 70.000 / lonjor 80.000 / biji 80,000.00 120.000 / lembar 5,000,000.00 5,500,000.00 65,000.00 70,000.00 70,000.00 75,000.00 75,000.00 80,000.00 65,000.00 70,000.00
M.059.d Papan (3x20) cm m3 16,555,560.00 115,000.00 110,000.00 115,000.00 5,000,000.00 6,000,000.00 76,000.00 80,000.00 120,000.00 80,000.00
M.059.g Usuk : 5/7 m3 7,450,065.00 77,000.00 72,000.00 75,000.00 5,000,000.00 90,000.00
M.059.h Balok m3 8,353,380.00 5,000,000.00
M.059.i Papan (2x20) cm m3 9,931,425.00 70,000.00 70,000.00 5500 / m3 12,000.00 65,000.00 15,000.00 5500 m3 5,000,000.00 85.000 / biji 70,000.00 11.000 / 3m
M.059.j Papan (3x20) cm m3 10,007,609.85 60,000.00 5500 / m3 75,000.00 20,000.00 5500 m3 5,000,000.00 125.000 / biji
M.059.k Papan (3x30) cm m3 11,220,590.85 6000 / m3 6500 m3 5,000,000.00
Kayu Kruing
M.059.l Reng : 2/3, 3/5 m3 8,972,324.55 6,500,000.00
M.059.m Usuk : 5/7 m3 8,972,324.55 7500 m3 8,500,000.00
M.059.n Balok m3 9,403,065.00 7500 m3
M.059.o Papan (2x20) cm m3 10,157,839.65 10,500,000.00
M.059.p Papan (3x20) cm m3 10,157,839.65
M.059.q Papan (3x30) cm m3 10,157,839.65
Kayu Kamper
M.059.r Reng : 2/3, 3/5 m3 13,544,685.00 9000 m3 9,500.00 9000 / m3 35,000.00 29,500.00 7,500,000.00 8,000,000.00
M.059.s Usuk : 5/7 m3 13,920,401.25 117,000.00 110,000.00 75,000.00 8,000,000.00
M.059.t Balok m3 14,293,860.00 125,000.00
M.059.w Papan (3x30) cm m3 17,302,144.65
Kayu Lain-lain
M.060 Kayu kelas II m3 14,293,860.00
M.060.a Kayu kelas I m3 21,787,500.00
M.061.b Kayu Perancah I (papan) Expose m3 4,966,500.00
M.061.c Kayu Perancah II (balok) Biasa m3 3,150,000.00
M.061.d Kayu Perancah II (papan) Biasa m3 3,150,000.00
M.062 List Kayu profil m 23,546.25
M.062.a List Kayu 2/4 m3 5,268,610.20
M.062.b List Gypsum m3 31,463.25 12,000.00
M.063 Kaso 4/6 cm m3 3,465,000.00 180,000.00
M.063.a Kayu Kaso 5 X 7 cm Kelas I m3 21,787,500.00
M.063.b Kayu Kaso 5 x 7 cm Kelas II m3 14,293,860.00
M.063.c Kayu Kaso 5 x 7 cm Kelas III m3 8,353,380.00
M.064 Kayu Papan/Papan Kayu m3 9,623,100.00
M.065 Kayu Papan kelas I m3 21,787,500.00
M.066 Kayu Papan Kelas II m3 14,293,860.00
M.066.a Kayu papan klas 2 Borneo m 797,475.00
M.067 Kayu Papan kelas III m3 8,353,380.00
M.067.a Kayu Papan Bekisting m3 2,677,500.00
Papan Kayu Kelas I
M.068 Papan 2/20 m3 24,150,000.00 10,000.00 9,000.00 90,000.00 120,000.00
M.068.a Papan 3/20 cm m3 24,150,000.00
M.068.b Papan (3x30) cm m3 24,150,000.00
Papan Kayu Kelas II
M.068.c Papan 2/20 m3 16,557,896.25 9,000.00 8,500.00 80,000.00
M.068.d Papan 3/20 cm m3 16,928,625.00
M.068.e Papan (3x30) cm m3 17,302,144.65
Papan Kayu Kelas III
M.068.f Papan 2/20 m3 9,931,425.00 22,000.00
REKAP BAHAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 79 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 66 68 69 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 62 71 52 53 54 55 56 57 83 58
Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kedung Kecamatan
Kecamatan Lowokwaru
Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kandang Klojen
Badung Kel.
Pisang Candi Badung Gadang Bndulan Bandulan Kel. Kel. Arjosari Kd. Baleajosari Kel. Kel. Kel. Jodipan Kel.Bumiayu
Mulyorejo Kebonsari Kebonsari Kebonsari Tejosari Tanjung Tejo Tunjungrejo Mulyorejo Kebonsari Tulusrejo Mulyoagung Mulyoagung Dinoyo Tunggulwulung Tlogomas Merjosari Kec. Lowok Kd. Polowijen Kel. Arjosari Kd. Baleajosari Kel. Kesatrian Kel. Bunulrejo Kel. Polehan Kel. Kejalrian Kel. Bunud Purwantoro Kel polowijen Jl. Rais (UD. Kel. Bumiayu (Mitra Mangliawan Pakis Kel. Tlogowaru (Ud. Kel. Arjowinangan Arjowinangun (Akbar Bareng ( Kawi
KODE NAMA BAHAN SATUAN HARGA 2018 Kec.Sukun Tejosari (Rajawali (Makmur Jaya (Sumber Kel. Tlogowaru UD. Ringin Agung Toko Masjhur Purwantoro (Tb. Mangun (Tb Utama Pandanwangi Pandanwangi Kota Lama Kec.Kedung Kandang Toko Cahaya Alam
(Makmur Jaya) (Sader Jaya) (Tunggul Jaya) (Masjhur) Kec.Sukun (Bedak Willys) (Mirah Rejeki) (Berkah Abadi) (Mely Jaya 2) Dinoyo Tasik Madu Tasik Madu Tulusrejo Mojolangu Jatimulyo (Prakasa Jatimulyo Lowokwaru Lowokwaru Merjosari Dinoyo (Sinar Dawuh (Ud. Merjosari (Ud.Atika Merjosari (TB Mandiri (Mat ahari) (Mayang Tunjung Sekar Tunjung Sekar Waru (AJ) (Kendedes) (SumberJaya) (Tb Barokah) (Rezza Jaya) (Sumber Alam) (Horas Jaya) (Moza I I) (Arjosari Jaya) (Manis (molyo) Djawa Baru) Karya) (R.J.A) Bumi Prakasa) (Anugrah) Jaya) Jaya)
(Rizky) (Rizky) Jaya) Abadi) Barokah) (Cahaya Alam) Berjaya) Jaya) (Gio Jaya) (Jati Utomo) (Ud. Koesnadi) (MJ)
(Supralon) (Ahmad Ning) (Bangun Jaya) (Budi Jaya) (Usaha Jaya) (Cahaya Alam) (Mulyo Joyo) Lunas) (Sederhana) (Mawar) (Ud.Cempaka) (Abadi) (Dinoyo Jaya) Sengkaling) Sidomakmur) (Barokah) Jaya) (LAM) Jaya) Grand) (Nona Jaya) (Tb Gemilang) Sentosa)
M.068.g Papan 3/20 cm m3 10,007,609.85
M.068.h Papan (3x30) cm m3 11,220,590.85
Kayu Jati Ex. Malang
M.068.c Papan Kayu Jati Ex Malang (3x30) cm m3 26,040,000.00
3
M.068.d Reng : 2/3, 3/5 m 21,720,200.00
M.068.e Usuk : 5/7 m3 21,720,200.00
M.068.f Balok m3 20,950,400.00
M.068.g Papan (2x20) cm m3 23,278,100.00
M.068.h Papan (3x20) cm m3 23,278,100.00
M.068.ha Papan (3x30) cm m3 24,150,000.00
Kayu Jati Ex. Madiun/Ngawi
M.068.i Reng : 2/3, 3/5 m3 31,037,500.00
M.068.j Usuk : 5/7 m3 39,900,000.00
M.068.k Balok m3 37,800,000.00
M.068.l Papan (2x20) cm m3 25,654,800.00
M.068.m Papan (3x20) cm m3 25,654,800.00
M.068.n Papan (3x30) cm m3 25,654,800.00
Kayu Jati Ex. Bojonegoro
M.068.o Reng : 2/3, 3/5 m3 32,002,900.00
M.068.p Usuk : 5/7 m 3
32,002,900.00
M.068.q Balok m3 32,002,900.00
M.068.r Papan (2x20) cm m3 32,002,900.00
M.068.s Papan (3x20) cm m3 32,002,900.00
M.068.t Papan (3x30) cm m3 32,002,900.00
M.069 Kayu Papan (3x20) cm m3 13,218,450.00
M.070 Tiang kayu 5/7 kelas II, tinggi 3m' m3 8,662,500.00
M.071 Tiang kayu 8/12 kelas II Tinggi 4 m m3 13,125,000.00
M.072 Patok kayu 5/7 - 1m' Ls 52,500.00
M.073 Patok kayu 5/7 (kayu kelas 2 Borneo) m3 2,415,000.00
M.074 Parquet m2 330,545.25
M.075.a Dolken Kayu Ø 8-10/400 cm btg 95,392.50
M.075.b Dolken kayu kelas III Ø 8 - 10 cm, panjang 4 m btg 95,392.50
M.075.c Kayu Dolken diameter 20 cm m 262,500.00
M.075.d Kayu Dolken diameter 10 cm - 12 cm batang 142,485.00
M.075.e Kayu Galam dia 8-10cm m 10,500.00
M.076 Kayu Acuan m3 4,562,250.00
M.077 Bekesting m2 1,312,500.00
M.077.a Kayu Bekisting m3 4,562,250.00
M.078 Kayu Perancah m3 4,562,250.00
M.079 Formwork Plate tebal 6 mm m2 813,750.00
M.080 Bambu btg 18,700.00 27,000.00 25,000.00 26,000.00 27,000.00 25,000.00 17,500.00 25,000.00 25,000.00 22,500.00 25,000.00 25,000.00 22,000.00 25,000.00
M.080.a Bambu Ø 8 - 10 cm m 8,951.25
M.080.b Bambu Ø 8 - 10 cm, panjang 4 m btg 35,805.00
M.080.c Bambu diameter 6-8/600 cm btg 35,805.00
M.080.d Gedeg (2.00 x 3.00) m lbr 69,667.50
M.081 Bilik Bambu m2 143,010.00
M.082 Seseg bambu m1 17,850.00 40,000.00
M.083 Batang skoor L.40.40.4 kg 29,531.25
M.086 Profil Alluminium m 150,911.25
M.086.a Profil Allum "T" m 99,750.00
M.087 Frame alluminium L.10.10.1 kg 69,300.00
M.088 Allumunium Strip m 31,100.00
M.089 Allumunium gel tebal 0,55 lbr 189,000.00 40,000.00
M.090 Allumunium Foil m2 47,355.00
M.091 Profil Kaca m 29,925.00 100,000.00
M.092 Kaca Polos m2 132,300.00
M.092.a Kaca tebal 3 mm m2 130,600.00 80,000.00 90,000.00 75,000.00 100,000.00 60,000.00
M.092.b Kaca tebal 5 mm m2 197,800.00 102,000.00 100,000.00 100,000.00 99,000.00 100,000.00 103,000.00 101,500.00 100,000.00 105,000.00 100,000.00 100,000.00 100,000.00 101,000.00 105,000.00 100,000.00 100,000.00 101,000.00 101,500.00 120,000.00 130,000.00 100,000.00 130,000.00 90,000.00
M.092.c Kaca tebal 8 mm m2 381,400.00 240,000.00 140,000.00 250,000.00 150,000.00 175,000.00
M.092.d Kaca Polos tebal 12 mm m2 552,500.00 350,000.00
M.093 Kaca "Wireglassed" 5 mm m2 890,400.00
M.093.a Kaca Rayben tebal 3 mm m2 194,800.00 80,000.00 100,000.00 90,000.00 100,000.00 65,000.00
M.093.b Kaca Rayben tebal 5 mm m2 285,300.00 97,000.00 95,000.00 92,500.00 95,000.00 90,000.00 98,500.00 98,500.00 98,000.00 95,500.00 95,000.00 95,000.00 95,000.00 94,500.00 100,000.00 97,000.00 95,000.00 98,000.00 98,500.00 120,000.00 110,000.00 100,000.00 110,000.00 90,000.00
M.093.c Kaca Rayben tebal 8 mm m2 583,300.00 240,000.00 135,000.00 250,000.00 140,000.00
M.093.d Kaca Rayben tebal 12 mm m2 937,125.00 350,000.00
M.094 Kaca Buram tebal 12 mm m2 526,500.00 -
M.094.a Kaca Buram tebal 3 mm m2 192,200.00 100,000.00 95,000.00 95,000.00 85,000.00
M.094.b Kaca Buram tebal 5 mm m2 289,600.00 135,000.00 105,000.00 135,000.00 105,000.00 120,000.00
M.094.c Kaca Buram tebal 8 mm m2 326,000.00 -
M.095 Kaca Cermin tebal 3 mm m2 323,700.00 150,000.00 120,000.00 210,000.00 120,000.00 11,000.00
M.095.a Kaca Cermin tebal 5 mm m2 413,900.00 240,000.00 175,000.00
M.095.b Kaca Cermin tebal 6 mm m2 416,325.00 - 270,000.00
M.095.c Kaca Cermin tebal 8 mm m2 750,000.00
M.096 Kaca Patri 5 mm m2 1,941,765.00 1,250,000.00 1,250,000.00
M.096.a Glass Block bh 36,225.00 25,000.00 25,000.00 25,000.00 23,500.00 23,500.00 26,000.00 23,000.00 25,500.00 24,000.00 23,000.00 25,000.00 25,000.00 23,500.00 24,000.00 24,000.00 23,500.00 23,000.00 25,000.00
M.096.b Painting Glass m2 792,949.50
M.097 Kawat Ø 4 mm kg 28,697.60 20,000.00 20,000.00 35,000.00 37,000.00 20.000 / m 19,000.00 180.000 / rol
M.097.a Kawat Ayam m2 25,187.79 25,000.00 25,000.00 20,000.00 25,000.00 24,000.00 25,500.00 25,500.00 24,500.00 40,000.00 25,000.00 50,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 24,500.00 24,500.00 40,500.00 40,500.00 30,000.00 17,500.00 40,000.00 50,000.00 16,000.00 150.00 50,000.00 10,000.00 20,000.00 17,000.00 500.00 20,000.00 30,000.00 25,000.00 1,000.00 1,000.00 500.00 10,000.00 22,000.00 20,000.00 25,000.00 30,000.00 15,000.00 1,000.00
M.098 Kawat ikat kg 28,697.60 20,000.00 22,500.00 30,000.00 24,000.00 42,000.00 23,000.00 20,000.00 39,000.00 10,000.00 42,500.00 40,000.00 - 41,000.00 35,000.00 15,000.00 37,000.00 20,000.00 35,000.00 20,000.00
M.099 Kawat bronjong bh 27,200.00 21.000 / kg 10.000 / roll 10.000 / roll 20,500.00 6000 / 10m 20.000 / kg 22,000.00 20,000.00 25,000.00 22,000.00 27.000 / kg 5000 / m 20,000.00 21,500.00 40,500.00 2500 / m 1500 / m 40,000.00 40,000.00 2000 / 1meter 117,000.00 39.000 / kg 23.000 / m
M.099.a Kawat bronjong Ø 2 mm kg 60,900.00 39,000.00
M.099.b Kawat bronjong Ø 2,7 mm kg 60,900.00 21,000.00
M.099.c Kawat bronjong Ø 3 mm kg 60,900.00
M.099.d Kawat bronjong kg 60,900.00 21,000.00
M.100 Kawat Beton kg 24,675.00 20,000.00 90,000.00 100,000.00 27,000.00 20,000.00
M.100.a Kawat Beton/Bendrat RRT kg 27,293.70 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 25,000.00 18,000.00 21,500.00 22,500.00 20,000.00 18,500.00 95,000.00 20,000.00 20,000.00 22,000.00 21,000.00 20,500.00 20,000.00 20,000.00 20,500.00 24,000.00 21,000.00 23,000.00 20,000.00 25,000.00 20,000.00 21,500.00 22,000.00 20,000.00 20,000.00 22,000.00 22,000.00 18,000.00 20,000.00 25,000.00 18,500.00 25,000.00 23,000.00 18,000.00 20,000.00 20,000.00 20,000.00 20,000.00 25,000.00 22,500.00 22,500.00 30,000.00 22,000.00 29,500.00 20,000.00 17,000.00 20,000.00 20,000.00 20,000.00 180,000.00
M.101 Kawat Las kg 89,250.00 25,000.00 19,000.00 35,000.00 37,000.00 25,000.00 40,000.00
M.101.a Kawat Las Listrik kg 89,250.00 33,000.00 33,000.00 33,000.00 35,000.00 35,000.00 33,500.00 35,000.00 35,500.00 40,000.00 34,000.00 35,000.00 33,500.00 40,000.00 32,000.00 19,000.00 35,000.00 37,000.00 70,000.00 22,500.00 33,000.00 15,000.00 35,000.00 33,000.00
M.101.b Kawat Las dos 114,187.50 45,000.00 70,000.00 65,000.00 65,000.00 35,000.00
M.101.c Kawat BC m1 70,400.00 13,000.00 15,000.00
M.102 Kawat jaring lbr 32,655.00 25,000.00 170,000.00 22,000.00 22,000.00
M.102.a Kawat Galvanis 3 mm kg 94,736.25 20,000.00
M.102.b Kawat Galvanis 2 mm kg 64,551.90 60.000 / kg
M.103 Kawat Duri m 34,440.00 95,000.00 95,000.00 95,000.00 2,500.00 2,500.00 2,333.33
M.103.a Kawat Duri kg 34,440.00 15,000.00 15,000.00 14,000.00 15,500.00 33,500.00 14,500.00 15,000.00 30,300.00 29,900.00 30,000.00 16,500.00 14,000.00 38,000.00 50,000.00 18,000.00 42,000.00 12,000.00 20,000.00 17,000.00 140,000.00
M.104 Kawat Nyamuk m2 31,100.00 25,000.00 30,000.00 15,000.00 29,000.00 32,000.00 28,000.00 30,000.00 20,000.00 22,000.00 20,000.00 23,000.00
M.105 Kawat seng 3 mm kg 33,075.00
M.106 Kawat kasa sampel pkt 11,025.00
M.106.a Kawat Harmonika Gas m2 69,900.00
M.107 Jaring Kawat Baja Dilas kg 36,225.00
M.108 Geotekstil m2 157,500.00 18,000.00
M.109 Paku kg 19,162.50 20,000.00 20,000.00 19,500.00 18,000.00 16,000.00
M.109.a Paku 1 cm - 2,5 cm kg 19,308.33 19,000.00 16,000.00 20,000.00 15,000.00 16,000.00 17,000.00 18,000.00 20,000.00 15,000.00 16,000.00 17,000.00 22,000.00 18,000.00 17,000.00 22,000.00 19,000.00 17,500.00 21,500.00 20,500.00 21,000.00 20,000.00 20,500.00 18,000.00 17,500.00 17,000.00 18,000.00 16,000.00 18,500.00 19,500.00 19,000.00 16,000.00 18,000.00 17,000.00 19,000.00 18,000.00 17,000.00 18,000.00 22,000.00 25,000.00 20,000.00 25,000.00 18,000.00 16,000.00 19,000.00 16,000.00 20,000.00 20,000.00 6,000.00 16,000.00
M.109.b Paku 3 - 6 cm kg 18,363.33 18,000.00 16,000.00 18,000.00 15,000.00 16,000.00 17,000.00 18,000.00 17,500.00 15,000.00 16,000.00 17,000.00 20,000.00 18,000.00 17,000.00 22,500.00 18,000.00 17,500.00 21,500.00 17,000.00 21,000.00 19,500.00 19,000.00 17,000.00 16,500.00 16,000.00 16,000.00 16,000.00 15,500.00 19,500.00 17,000.00 20,000.00 16,000.00 18,000.00 20,000.00 16,500.00 22,000.00 22,500.00 18,000.00 16,000.00 17,000.00 20,000.00
M.109.c Paku 5-7 cm kg 19,162.50 18,000.00 16,000.00 18,000.00 15,000.00 16,000.00 17,000.00 18,000.00 17,000.00 15,000.00 16,000.00 17,000.00 18,000.00 18,000.00 17,000.00 20,000.00 16,500.00 17,500.00 19,000.00 17,500.00 20,000.00 19,500.00 16,000.00 16,000.00 16,500.00 16,000.00 15,000.00 16,000.00 15,500.00 19,500.00 15,000.00 16,000.00 18,000.00 17,000.00 20,000.00 16,500.00 20,000.00 16,000.00 18,000.00 18,000.00 20,000.00 20,000.00 18,000.00 16,000.00 18,000.00 16,000.00 18,000.00 28,000.00
M.109.d Paku 5 dan 7 cm kg 17,587.50 18,000.00 16,000.00 18,000.00 15,000.00 16,000.00 17,000.00 18,000.00 18,000.00 15,000.00 16,000.00 17,000.00 18,000.00 17,000.00 17,500.00 17,500.00 20,000.00 19,000.00 16,000.00 16,000.00 15,500.00 16,000.00 16,000.00 15,000.00 19,500.00 15,000.00 18,000.00 16,000.00 20,000.00 17,500.00 16,000.00 18,000.00 20,000.00 18,000.00 16,000.00 16,000.00 16,000.00 15,000.00
M.109.e Paku campuran 5cm dan 7 cm kg 17,570.00 17,000.00 15,000.00 16,000.00 17,000.00 17,000.00 15,000.00 17,000.00 16,000.00 17,000.00 18,000.00 17,500.00 18,500.00 20,000.00 18,000.00 16,000.00 20,000.00 17,000.00 16,000.00 15,000.00 16,000.00 19,500.00 18,000.00 16,000.00 15,000.00 15,000.00 20,000.00 18,000.00 16,000.00 16,000.00
M.109.f Paku 5-10 cm kg 18,375.00 17,000.00 15,000.00 16,000.00 17,000.00 17,500.00 15,000.00 17,500.00 17,000.00 17,500.00 20,000.00 18,000.00 17,000.00 18,000.00 17,000.00 16,000.00 20,000.00 17,000.00 22,500.00 16,000.00 15,000.00 21,000.00 22,000.00 16,000.00 19,500.00 21,000.00 18,000.00 16,000.00 25,000.00 15,000.00 17,000.00 16,000.00 16,000.00 15,000.00 15,000.00 17,000.00 18,000.00 18,000.00 20,000.00 18,000.00 16,000.00 16,000.00 16,000.00 18,000.00 15,000.00
M.109.g Paku 5 dan 10 cm kg 19,162.50 17,000.00 15,000.00 15,500.00 17,000.00 17,500.00 15,000.00 17,500.00 16,500.00 17,500.00 20,000.00 18,000.00 16,000.00 20,000.00 17,000.00 16,000.00 15,000.00 15,000.00 16,000.00 19,500.00 18,000.00 16,000.00 25,000.00 15,000.00 17,000.00 18,000.00 16,000.00 15,000.00 17,000.00 18,000.00 18,000.00 20,000.00 20,000.00 18,000.00 16,000.00 15,000.00 16,000.00 18,000.00 15,000.00 15,000.00
M.109.h Paku 5-12 cm kg 19,162.50 17,000.00 15,000.00 15,500.00 16,000.00 17,000.00 15,500.00 18,000.00 17,000.00 17,000.00 19,000.00 18,000.00 15,500.00 17,500.00 16,000.00 15,000.00 18,000.00 16,000.00 25,000.00 15,000.00 15,000.00 17,000.00 18,000.00 18,000.00 20,000.00 20,000.00 16,000.00 15,000.00 16,000.00 18,000.00 15,000.00 15,000.00
M.109.i Paku 7 cm kg 17,675.00 17,000.00 18,000.00 15,000.00 15,500.00 16,000.00 17,000.00 15,500.00 17,000.00 17,000.00 17,000.00 19,000.00 18,000.00 18,000.00 18,500.00 18,000.00 18,500.00 16,500.00 18,000.00 16,000.00 15,000.00 16,000.00 20,000.00 15,000.00 15,000.00 17,000.00 18,000.00 18,000.00 20,000.00 20,000.00 16,000.00 15,000.00 16,000.00 18,000.00 15,000.00 15,000.00
M.109.j Paku 7cm - 10 cm kg 18,081.62 17,500.00 18,000.00 14,500.00 16,000.00 17,500.00 18,500.00 17,500.00 17,500.00 17,500.00 18,000.00 18,000.00 18,000.00 19,000.00 18,500.00 18,500.00 17,500.00 18,500.00 16,000.00 15,000.00 16,000.00 20,000.00 15,000.00 17,000.00 18,000.00 20,000.00 20,000.00 16,000.00 15,000.00 16,000.00 18,000.00 15,000.00 15,000.00
M.109.k Paku 7 cm - 12 cm kg 18,219.44 17,500.00 18,000.00 14,000.00 16,000.00 17,500.00 17,000.00 17,000.00 18,000.00 18,000.00 18,000.00 18,000.00 19,500.00 18,500.00 18,500.00 17,500.00 18,500.00 16,000.00 15,000.00 20,000.00 17,000.00 18,000.00 20,000.00 16,000.00 16,000.00 18,000.00 15,000.00
M.109.l Paku 10 cm kg 19,162.50 17,500.00 15,000.00 17,500.00 17,000.00 17,500.00 18,000.00 18,000.00 18,000.00 18,000.00 19,000.00 17,500.00 18,500.00 18,000.00 17,500.00 16,000.00 10,000.00 20,000.00 17,000.00 18,000.00 15,000.00 16,000.00 16,000.00 18,000.00 15,000.00
M.109.m Paku 12 cm bh 17,521.88 16,000.00 16,000.00 16,500.00 20,000.00 15,000.00 16,000.00 18,000.00
M.109.n Paku 2"-3" kg 16,905.00 16,000.00 15,000.00 16,000.00 16,000.00
M.109.o Paku Kayu Segala Ukuran kg 29,820.00 50,000.00 26,000.00 25,000.00 19,500.00 25,000.00 16,000.00
M.110 Paku Biasa kg 24,325.00 23,500.00 23,000.00 23,000.00
M.110.a Paku biasa ½" - 1" kg 19,687.50 18,000.00
M.110.b Paku Biasa 2"-5" kg 19,162.50 15,000.00 17,000.00
M.111 Paku Skrup kg 14,910.00 32.000 / 1kotak 27,000.00 25.000 / dus 10,000.00 8,000.00
M.111.a Paku Skrup 1 cm - 2,5 cm bh 37,905.00 6,000.00 5,000.00 8000 / dus 7000 / dus 10,000.00 15,000.00 200.00 7,500.00 15,000.00 6000/pc 200,000.00
M.111.b Paku skrup 3,5 " bh 95,637.50 20,000.00 21,000.00 5,000.00 6,000.00 8,000.00 20,000.00 7,500.00 20.00 15000/pc 500,000.00 5000 / 1pack kecil
M.111.c Paku/Skrup 5 cm kg 102,965.63 28,000.00 55,000.00 56,000.00 56,000.00 29,000.00 55,000.00 5000 / pc 7,000.00 20.000-25.000 500.00 9000 / dus 500,000.00 5000 / 1pack kecil
M.111.d Paku Skrup 10 cm kg 223,781.25 40,000.00 57,000.00 32,000.00 6000 / pc 28,000.00 40.0000 / dus 45.000 / dus 17,500.00 60.000 / gross 50.000 / kg 25.000 / dus 750,000.00 10.000 - 15.000 / 1dus
M.112 Paku tripleks kg 28,267.97 20,000.00 18,000.00 20,000.00 18,000.00 16,000.00 20,000.00 20,500.00 20,500.00 18,000.00 17,000.00 20,000.00 22,000.00 19,000.00 34,000.00 31,500.00 34,000.00 33,500.00 21,000.00 19,500.00 54,000.00 17,000.00 18,000.00 42,000.00 54,000.00 18,500.00 19,500.00 53,000.00 40,000.00 17,500.00 40,000.00 15,000.00 20,000.00
M.113 Paku asbes kg 21,431.25 21,000.00 18,000.00 20,000.00 18,000.00 16,000.00 20,000.00 20,000.00 20,000.00 20,500.00 21,500.00 22,000.00 19,000.00 25,000.00 22,000.00 24,500.00 24,000.00 21,500.00 21,000.00 16,000.00 15,000.00 43,000.00 15,500.00 35,000.00 18,000.00 18,000.00
M.114 Paku payung dus 283,500.00 41.000 / kg 35,000.00 40,000.00 40,000.00 45,000.00 41,000.00 40,000.00 39,500.00 40,000.00 40,000.00 50,000.00 40,000.00 47,500.00 48,000.00 49,000.00 49,500.00 41,500.00 43,000.00 42,000.00 47,000.00 45,000.00 46,500.00 109,000.00 41,000.00 40.000 / kg 40,000.00 33,000.00 40.000 / leg 40,000.00 45.000 / leg 35,000.00 35.000 / kg 50.000 / kg 45.000 / kg 60.000 / kg 40.000 / kg 50,000.00 45.000 dir 50.000 50.000 / kg 35.000 / kg 30,000.00 35.000 / kg
M.115 Paku seng kg 46,100.00 40,000.00 35,000.00 40,000.00 40,000.00 45,000.00 4,000.00 40,500.00 41,000.00 35,000.00 39,000.00 40,000.00 25,000.00 39,000.00 35,000.00 40,500.00 49,000.00 45,000.00 41,500.00 46,500.00 24,000.00 40,000.00 40,000.00 27,500.00 50,000.00 27,500.00
M.116 Paku Pancing 6 x 23 kg 18,165.00
M.117 Paku hak panjang 15 cm kg 18,165.00
M.118 Baut + Muur, Ø 100 mm - panjang 3-5 cm bh 18,165.00 2,000.00 1,500.00 6,000.00 5,000.00 6,000.00
M.119 Baut Ø 12 - 20 cm bh 8,085.00 500.00 2,000.00 10,000.00 1,000.00
M.119.a Baut Ø 12 mm panjang 5 cm bh 5,460.00 700.00 1,500.00
M.119.b Baut Ø 12 mm - panjang 20cm bh 8,085.00 700.00 3,000.00 1,500.00
M.119.c Baut kg 31,900.00
M.119.d Baut Angkur kg 0.00
M.119.e Baut Mutu Tinggi bh 0.00
M.119.f Baut Angkur Kabel Prategang m2 0.00
M.119.g Baut Angkur Kabel Prategang bh 0.00
M.120 Dinabolt Ø12 mm (10-15 cm) bh 12,600.00 1,200.00
M.121 Dynabolt / raamset Ø 8 mm bh 9,975.00 700.00
M.121.a Dynabolt / raamset Ø 8 mm panjang 4 - 5 cm bh 11,025.00 500.00
M.122 Fitting bh 18,375.00 16,000.00 400.00
M.122.a Fiting Flafond bh 17,200.00 200.00
M.123 Skrup Fixer bh 157.50 300.00
M.124 Reng 2 x 3 cm m3 10,342,500.00 14,000.00 60,000.00 59,000.00 60,000.00 59,000.00 18,000.00 20,000.00
M.124.a Reng 3 x 4 cm m3 10,342,500.00 70,500.00 68,000.00 89,500.00 69,000.00 35,000.00 37,000.00
M.124.b Reng : 2/3, 3/5 m3 13,065,837.75 55,000.00
M.125 Triplek 3 mm lbr 76,782.30 55,000.00 60,000.00 60,000.00 50,000.00 50,000.00 54,000.00 55,500.00 56,500.00 55,500.00 58,000.00 56,500.00 59,000.00 50,000.00 53,000.00 51,000.00 58,000.00 50,000.00 50,500.00 56,000.00 60,000.00 75,000.00 65,000.00 60,000.00 61,500.00 60,000.00 58,000.00 52,000.00 63,000.00 55,000.00 53,000.00 60,000.00 50,000.00 50,000.00 55,000.00 104,000.00 55,000.00 54,000.00 55,000.00 57,000.00 65,000.00 120,000.00 65,000.00 54,000.00 50,000.00 55,000.00 49,500.00 55,000.00 54,000.00
M.125.a Triplek 4 mm lbr 105,400.00 67,000.00 70,000.00 80,000.00 62,500.00 60,000.00 65,500.00 69,000.00 67,000.00 65,000.00 70,000.00 65,500.00 72,000.00 62,000.00 75,000.00 74,000.00 70,000.00 74,000.00 73,500.00 68,000.00 78,000.00 85,000.00 75,000.00 72,500.00 73,500.00 65,000.00 70,000.00 67,000.00 67,000.00 80,000.00 65,000.00 77,000.00 70,000.00 85,000.00 75,000.00 75,000.00 122,000.00 65,000.00 75,000.00 70,000.00 75,000.00 75,000.00 55,000.00 66,000.00 65,000.00 65,000.00 64,000.00 80,000.00
M.126 Dinding triplek 4 mm lbr 74,340.00 75,000.00 70,000.00 95,000.00 65,000.00 65,000.00 70,000.00 42,000.00
M.127 Gypsum board lbr 115,136.70 55,000.00 55,000.00 75,000.00 68,000.00 60,000.00 50,000.00 45,000.00 58,000.00
M.128 Multiflex 12 mm lbr 214,935.00 165,000.00 162,000.00 165,500.00 167,000.00 169,000.00 166,000.00 166,500.00 165,000.00 162,500.00 166,000.00 165,500.00 164,000.00 170,000.00
M.128.a Multiflex 18 mm lbr 264,600.00 218,000.00 215,000.00 218,500.00 217,000.00 219,000.00 219,000.00 219,000.00 218,000.00 215,500.00 217,000.00 219,500.00 245,000.00 230,000.00
M.129 Multiplex tebal (8mm**) lbr 119,280.00 79,000.00
M.129.a Multiplex tebal 9mm lbr 132,300.00 125,000.00 123,500.00 125,000.00 127,000.00 124,000.00 124,000.00 127,000.00 125,000.00 124,000.00 125,500.00 127,000.00 118,000.00 117,000.00
M.130 Plywood (30 x 60) cm x 4 mm lbr 142,590.00
M.130.a Plywood (30 x 60) cm x 4 mm m3 301,875.00
M.130.b Plywood 4 mm, 120 x 240 lbr 227,082.45 96,000.00 105,000.00
M.130.c Plywood (30 x 60) cm x 6 mm lbr 141,926.40
M.130.d Plywood (60 x 120) cm x 4 mm lbr 141,926.40
M.130.e Plywood (60 x 120) cm x 6 mm lbr 184,504.95
M.131 Plywood Tebal 4 mm Ukuran (90x220) cm lbr 109,200.00 85,000.00
M.131.a Plywood Tebal 9 mm lbr 102,900.00
M.132 Teakwood 4 mm, 90 x 220 lbr 96,600.00
M.132.a Teakwood (30 x 60) cm x 4 mm lbr 63,905.10
M.132.b Teakwood (60 x 120) cm x 4 mm lbr 92,251.95
M.132.c Teakwood (120 x 240) cm x 4 mm lbr 131,900.00 87,000.00
M.133 Wallpaper m2 100,900.00
M.133.a Wallpaper lebar 50 cm m 51,345.00
M.134 Seng pelat m 16,852.50 20,000.00
M.134.a Seng plat/pelat lbr 67,410.00 40,000.00
M.134.b Seng pelat 3"x6" lbr 67,410.00
M.134.c Seng plat 3 x 6" bjls 28 lbr 67,410.00
M.134.d Seng plat BJLS 30 L = 0.60 M m3 56,100.00 34,000.00 33,500.00 35,000.00 35,000.00 35,000.00 35,000.00 34,000.00 34,000.00 32,500.00 35,000.00 33,000.00 35,000.00 36,000.00 22,000.00 20,000.00 25,000.00 22,000.00 30,000.00 25,000.00 22,000.00 24,000.00 20,000.00 22,000.00
M.134.e Seng plat BJLS 30 L = 0.90 M m3 73,517.85 43,000.00 41,500.00 42,000.00 44,000.00 44,000.00 44,500.00 43,000.00 44,000.00 40,500.00 42,000.00 43,500.00 44,000.00 42,000.00 36,000.00 35,000.00 75,000.00 45,000.00 35,000.00 30,000.00 27,500.00
M.134.f Seng plat BJLS 28 (90 x 180) cm lbr 100,800.00 90,000.00
M.134.g Seng plat BJLS 30 L = 0.60 M m' 83,737.50
M.134.h Seng plat BJLS 30 L = 0.90 M m' 105,025.50
M.135 Seng gelombang lbr 66,720.65 58,500.00 62,000.00 57,000.00 52,500.00 55,500.00 55,000.00 58,500.00 59,000.00 57,500.00 60,000.00 59,000.00 95,000.00 55,000.00 85,000.00 57,500.00 60,000.00 95,000.00 180,000.00 75,000.00 90,000.00 51,000.00 40,000.00 52,000.00 65,000.00
M.135.a Seng gelombang kg 67,830.00 60,000.00 85,000.00 52,000.00 70,000.00
M.135.b Seng gel 3' x 6' lbr 202,230.00 28,500.00 52,000.00 80,000.00 30,000.00
Se ng ge lomba ng BJLS-30 (t=0,05) ti ngg i 1,8 m' da n leb ar 0 ,9
M.135.c m' lbr 74,608.33 78,000.00 75,000.00 77,000.00 79,000.00 77,000.00 77,000.00 78,000.00 79,000.00 79,000.00 78,500.00 77,000.00 80,000.00 86,000.00 55,000.00 55,000.00 69,000.00 55,000.00 55,000.00 55,000.00 87,000.00 90,000.00 54,000.00 53,000.00 60,000.00
80,000.00 53,000.00
M.136 Asbes Semen m2 38,208.33 12,000.00 69,000.00 40,000.00 70,000.00 70,000.00 22,000.00
M.137 Asbes gelombang lbr 143,850.00 35,000.00 35,000.00 35,500.00 33,000.00 32,500.00 34,000.00 35,000.00 33,500.00 35,500.00 33,000.00 35,000.00 35,000.00 30,000.00 65,000.00 34,000.00 36,000.00 24,000.00 60,000.00 45,000.00 80,000.00 85,000.00 34,000.00 39,000.00 65,000.00 80,000.00 36,000.00 30,000.00 30,000.00
M.137.a Asbes Gelombang (92 cm x 250 cm) lbr 147,500.00 48,000.00 89,000.00 240,000.00 63,000.00 39,000.00 59,000.00 90,000.00 45,000.00 40,000.00 36,500.00
M.137.b Asbes (1,00 x 1,00) m x 6 mm lbr 46,620.00 12,000.00 60,000.00 45,000.00 55,000.00 50,000.00
M.137.c Asbes (1,00 x 1,00) m x 5 mm lbr 31,100.00 12,000.00 60,000.00 60,000.00 65,000.00
M.137.d Asbes (1,00 x 1,00) m x 4 mm lbr 27,700.00 13,500.00 12,000.00 76,500.00 62,000.00
M.137.e Asbes (1,00 x 1,00) m x 3,5 mm lbr 24,675.00 12,000.00
M.138 Plafon asbes 3 mm(1x1m) lbr 15,540.00 13,000.00
M.139 Roof Light Fibreglass m2 143,850.00
M.140 Sunscreen Aluminium m2 465,291.75
M.141 Bubung Stel Gelombang 0.92 m lbr 71,535.45
M.141.a Bubung Stel Gelombang 1.05 m lbr 75,915.00 45,000.00
M.141.b Bubung Stel Gelombang 1.08 m lbr 76,252.05
M.141.c Bubung Genteng Biasa ex. Malang bh 3,360.00
M.141.d Bubung Genteng Press ex. Trenggalek bh 5,145.00
M.141.e Bubung Genteng Karang Pilang ex. Malang bh 7,140.00
M.141.f Bubung Genteng Karang Pilang ex. Trenggalek bh 7,700.00
M.141.g Bubung Genteng Karang Pilang ex. Surabaya bh 10,263.75
M.141.h Bubung Genteng Palentong Kecil bh 6,800.00
M.141.i Bubung Genteng Beton bh 12,180.00
M.141.j Bubung Genteng Aspal bh 67,200.00
M.141.k Bubung Genteng Metal bh 149,100.00
M.141.l Bubung Seng Gelombang lbr 122,850.00
M.141.m Bubung Atap Aluminium m2 149,730.00
M.141.n Bubung Atap Seng Galvalum bh 155,925.00
M.142 Akustik lbr 40,137.30
M.142.a Kalsi Board t=0,45mm lbr 61,110.00
M.142.b Akustik (30 x 60) cm lbr 45,360.00
M.142.c Akustik (30 x 30) cm lbr 40,137.30
M.143 Internal cove artistik 5 x 5 x 20 cm bh 36,000.00
M.144 Genteng Beton bh 8,925.00
M.144.a Genteng Biasa ex. Malang bh 2,000.00
M.144.b Genteng Press ex. Trenggalek bh 2,100.00
M.144.c Genteng Karang Pilang ex. Malang bh 4,331.25
M.144.d Genteng Karang Pilang ex. Trenggalek bh 4,331.25
M.144.e Genteng Karang Pilang ex. Surabaya bh 5,775.00
M.145 Genteng Aspal bh 10,080.00
M.146 Genteng Bubung Palentong bh 7,035.00
M.146.a Genteng Bubung Palentong Besar bh 12,285.00
M.146.b Genteng Bubung Kodok Glazuur bh 13,200.00
M.147 Sirap Kayu bh 4,257.75
M.147.a Atap Sirap bh 4,700.00 2,700.00
M.147.b Atap Polycarbonat m2 315,000.00
M.147.c Atap Seng Galvalum m2 174,300.00
M.148 Genteng Kodok Glazuur bh 7,035.00
M.149 Genteng Kodok palentong besar/super bh 7,980.00
M.150 Genteng Palentong Kecil bh 3,800.00
REKAP BAHAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 79 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 66 68 69 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 62 71 52 53 54 55 56 57 83 58
Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kedung Kecamatan
Kecamatan Lowokwaru
Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kandang Klojen
Badung Kel.
Pisang Candi Badung Gadang Bndulan Bandulan Kel. Kel. Arjosari Kd. Baleajosari Kel. Kel. Kel. Jodipan Kel.Bumiayu
Mulyorejo Kebonsari Kebonsari Kebonsari Tejosari Tanjung Tejo Tunjungrejo Mulyorejo Kebonsari Tulusrejo Mulyoagung Mulyoagung Dinoyo Tunggulwulung Tlogomas Merjosari Kec. Lowok Kd. Polowijen Kel. Arjosari Kd. Baleajosari Kel. Kesatrian Kel. Bunulrejo Kel. Polehan Kel. Kejalrian Kel. Bunud Purwantoro Kel polowijen Jl. Rais (UD. Kel. Bumiayu (Mitra Mangliawan Pakis Kel. Tlogowaru (Ud. Kel. Arjowinangan Arjowinangun (Akbar Bareng ( Kawi
KODE NAMA BAHAN SATUAN HARGA 2018 Kec.Sukun Tejosari (Rajawali (Makmur Jaya (Sumber Kel. Tlogowaru UD. Ringin Agung Toko Masjhur Purwantoro (Tb. Mangun (Tb Utama Pandanwangi Pandanwangi Kota Lama Kec.Kedung Kandang Toko Cahaya Alam
(Makmur Jaya) (Sader Jaya) (Tunggul Jaya) (Masjhur) Kec.Sukun (Bedak Willys) (Mirah Rejeki) (Berkah Abadi) (Mely Jaya 2) Dinoyo Tasik Madu Tasik Madu Tulusrejo Mojolangu Jatimulyo (Prakasa Jatimulyo Lowokwaru Lowokwaru Merjosari Dinoyo (Sinar Dawuh (Ud. Merjosari (Ud.Atika Merjosari (TB Mandiri (Mat ahari) (Mayang Tunjung Sekar Tunjung Sekar Waru (AJ) (Kendedes) (SumberJaya) (Tb Barokah) (Rezza Jaya) (Sumber Alam) (Horas Jaya) (Moza I I) (Arjosari Jaya) (Manis (molyo) Djawa Baru) Karya) (R.J.A) Bumi Prakasa) (Anugrah) Jaya) Jaya)
(Rizky) (Rizky) Jaya) Abadi) Barokah) (Cahaya Alam) Berjaya) Jaya) (Gio Jaya) (Jati Utomo) (Ud. Koesnadi) (MJ)
(Supralon) (Ahmad Ning) (Bangun Jaya) (Budi Jaya) (Usaha Jaya) (Cahaya Alam) (Mulyo Joyo) Lunas) (Sederhana) (Mawar) (Ud.Cempaka) (Abadi) (Dinoyo Jaya) Sengkaling) Sidomakmur) (Barokah) Jaya) (LAM) Jaya) Grand) (Nona Jaya) (Tb Gemilang) Sentosa)
M.151 Genteng Metal bh 163,000.00
M.152 Pintu Aluminium m 208,031.25 20,000.00 265,000.00 190,000.00 210,000.00 700,000.00 200,000.00 190,000.00 280,000.00 200,000.00 235,000.00 225,000.00 220,000.00 235,000.00 175,000.00 165,000.00 170,000.00 250,000.00 180,000.00
M.152.a Pintu Fiber KM Unit 542,900.00 185,000.00 230,000.00 200,000.00 180,000.00 175,000.00 185,000.00
M.153 Pintu double taekwood rangka kayu m2 667,590.00 200,000.00 600,000.00
M.154 Pintu Lipat m2 2,629,100.00 175,000.00
M.155 Pintu Gulung Besi m2 3,349,600.00 250,000.00
M.156 Door Holder bh 183,987.30
M.157 Door Closer set 257,565.00
M.158 Door Stop bh 55,543.95 4000 - 8000
M.158.a Grendel Pintu bh 35,500.00 6,000.00 5,000.00 6,000.00 6,000.00 6,000.00 7,500.00 10,000.00 7,000.00 6,000.00 9,000.00 10,000.00 19,000.00 17,500.00 18,500.00 5,000.00 5,000.00 15,000.00 5,000.00 5,000.00 4,500.00 7,000.00 10,000.00 10,000.00
M.158.b Grendel Jendela bh 20,100.00 7,000.00 3,000.00 6,000.00 9,000.00 5,000.00 7,500.00 8,000.00 6,000.00 9,000.00 10,000.00 7,000.00 5,000.00 6,000.00 5,000.00 7,000.00 10,000.00 10,000.00
M.158.c Hak Angin bh 44,300.00 15,000.00 13,000.00 15,000.00 13,500.00 15,000.00 15,500.00 14,500.00 30,000.00 15,000.00 151,500.00 150,000.00 150,500.00 14,500.00 15,000.00 14,500.00 25,000.00 15,000.00
M.159 Rolling Door Allumunium m2 1,947,600.00
M.160 Rel Pintu Sorong set 216,200.00
M.161 Jendela kaca nako daun 33,180.00 16,500.00 13,500.00 16,000.00 17,500.00 16,000.00 16,500.00 16,000.00 16,500.00 17,000.00 15,000.00 15,500.00 17,000.00 15,500.00
M.161.a Jendela Naco bh 262,500.00 16,600.00
M.161.b Jendela Nako (Rangka + Kaca 5 mm) m2 400,050.00
M.162 Venections blinds dan vertical blinds (tirai) m2 800,090.55
M.163 Spring Knip bh 36,225.00 20,000.00 25,000.00 25,000.00 24,000.00 25,000.00 24,500.00 20,000.00
M.164 Engsel Pintu bh 51,030.00 20,000.00 15,000.00 21,500.00 25,000.00 20,500.00 25,000.00 20,500.00 19,000.00 21,000.00 21,000.00 22,000.00 30,000.00 25,000.00 20,000.00 25,000.00 25,500.00 24,000.00 24,500.00 24,500.00 19,500.00 25,000.00 19,000.00 24,000.00 25,000.00 22,500.00 255,000.00 6,000.00 24,000.00 23,000.00 23,000.00 25,000.00 23,000.00 12,000.00 20,000.00 11,000.00 10,000.00 20,000.00 25,000.00 25,000.00 15,000.00 15,000.00 17,500.00 15,000.00 10,000.00 30,000.00 20,000.00 20,000.00 20,000.00 14,000.00 20,000.00 12,000.00
M.165 Engsel jendela bh 22,938.46 25,000.00 3,000.00 25,000.00 20,000.00 40,000.00 24,500.00 25,000.00 24,000.00 27,000.00 24,500.00 15,000.00 25,000.00 7,000.00 24,000.00 26,000.00 18,500.00 18,500.00 80,000.00 17,000.00 10,000.00 20,000.00 20,000.00 25,000.00 25,000.00 30,000.00 15,000.00 7,000.00
M.166 Engsel tanam di las bh 157,500.00 15,000.00 10,000.00 25,000.00 30,000.00
M.167 Engsel angin bh 39,375.00 15,000.00 65,000.00 10,000.00
M.168 Kunci slot bh 81,560.94 55,000.00 20,000.00 54,000.00 50,000.00 52,000.00 25,000.00 55,000.00 54,500.00 56,000.00 54,000.00 55,500.00 135,000.00 55,000.00 55,000.00 133,000.00 135,000.00 133,000.00 133,500.00 54,000.00 56,000.00 54,000.00 60,000.00 59,500.00 60,000.00 59,000.00 140,000.00 60,000.00 90,000.00 85,000.00 100,000.00 90,000.00 110,000.00 90,000.00 50,000.00 47,500.00 75,000.00 150,000.00 80,000.00 85,000.00 85,000.00 55,000.00 60,000.00 75,000.00 125,000.00
M.169 Kunci Tanam bh 167,685.00 150,000.00 85,000.00 80,000.00 170,000.00
M.169.a Kunci Tanam Biasa bh 167,685.00 15,000.00
M.169.b Kunci Tanam Antik bh 141,435.00
M.169.c Kunci Tanam KM bh 30,240.00 85,000.00
M.169.d Kunci Silinder bh 220,710.00 50,000.00 20,000.00 18,500.00 19,000.00 55,000.00 18,000.00 18,000.00 17,000.00
M.170 Kunci Lemari set 19,110.00 12,500.00 15,000.00 12,000.00 12,000.00 10,500.00 12,000.00 12,500.00 15,000.00 12,000.00 15,000.00 12,000.00 20,000.00 12,000.00 12,000.00 19,000.00 21,000.00 21,500.00 20,500.00 12,000.00 14,500.00 21,500.00 27,000.00 20,000.00 21,500.00 22,000.00 20,000.00 19,000.00 21,000.00 14,000.00 18,000.00 20,000.00 15,000.00 15,000.00 10,000.00 15,000.00 20,000.00 22,500.00 17,500.00 6,500.00 20,000.00 18,000.00 17,500.00 16,000.00 15,000.00 18,000.00 18,500.00
M.171 Kait Angin bh 22,365.00 15,000.00
M.172 Bak Air Fiberglass unit 4,725,000.00 350,000.00 250,000.00 300,000.00
M.172.a Bak Mandi Fibre bh 735,000.00 310,000.00 290,000.00 285,000.00 287,000.00 350,000.00 290,000.00 300,000.00 325,000.00 325,000.00 270,000.00 280,000.00 265,000.00 300,000.00
M.173 Bak Cuci Piring Stainlessteel unit 452,550.00 175,000.00 125,000.00 185,000.00 185,500.00 180,000.00 175,000.00 192,000.00 187,000.00 179,500.00 150,000.00 185,000.00 150,000.00 185,000.00 160,000.00 150,000.00 125,000.00 200,000.00 280,000.00 200,000.00 200,000.00 160,000.00 180,000.00 200,000.00 215,000.00 215,000.00 200,000.00 185,000.00 180,000.00 130,000.00 190,000.00 210,000.00 175,000.00 165,000.00 190,000.00 135,000.00
M.174 Bak Cuci Piring Teraso unit 417,585.00 125,000.00 200,000.00
M.175 Bathcuip unit 3,675,000.00
M.175.a Tempat Sabun Keramik bh 52,500.00 25,000.00 25,000.00 45,000.00 35,000.00 50,000.00 50,000.00 30,000.00 30,000.00 50,000.00 35,000.00 35,000.00 25,000.00
M.175.b Afur Stainless bh 94,500.00 25,000.00 20,000.00
M.175.c Afur Plastic bh 39,900.00 15,000.00 10,000.00
M.176 Urinoir unit 1,690,500.00 1,600,000.00
M.177 Kloset Duduk unit 2,370,824.40 150,000.00 250,000.00 1,015,000.00 900,000.00 152,000.00 150,500.00 149,000.00 150,500.00 1,500,000.00 152,000.00 190,000.00 149,500.00 150,000.00 149,000.00 152,000.00 402,000.00 385,000.00 400,000.00 295,000.00 401,000.00 400,000.00 400,000.00 850,000.00 380,000.00 425,000.00 350,000.00 800,000.00 135,000.00 350,000.00 245,000.00 350,000.00 450,000.00 350,000.00 150,000.00 350,000.00 350,000.00 380,000.00 1,300,000.00 1,250,000.00 400,000.00 150,000.00
M.177.a Kloset Duduk Lux unit 2,835,000.00 1,350,000.00 2,500,000.00 135,000.00 145,000.00
M.178 Kloset Jongkok Porselen unit 260,400.00 190,000.00 120,000.00 150,000.00 150,000.00 140,000.00 175,000.00 100,000.00 140,500.00 141,000.00 138,000.00 139,000.00 140,000.00 150,000.00 135,000.00 148,000.00 190,000.00 150,000.00 190,000.00 142,000.00 120,000.00 141,000.00 140,500.00 142,000.00 12,000.00 140,000.00 150,000.00 130,000.00 275,000.00 150,000.00 135,000.00 175,000.00 100,000.00 150,000.00 95,000.00 120,000.00 150,000.00 125,000.00 130,000.00 145,000.00 115,000.00 115,000.00 175,000.00 165,000.00 110,000.00 135,000.00 135,000.00
M.178.a Kloset Jongkok Lux Unit 840,000.00 125,000.00 195,000.00 1,560,000.00 160,000.00 16,000.00
M.179 Kloset Jongkok Teraso unit 148,050.00 92,000.00 190,000.00
M.180 Wastafel unit 659,979.60 495,000.00 200,000.00 490,000.00 496,500.00 497,000.00 496,000.00 494,000.00 495,000.00 499,500.00 495,000.00 500,000.00 499,000.00 495,500.00 494,500.00 300,000.00 300,000.00 250,000.00 250,000.00 125,000.00 250,000.00
M.180.a Wastafel Komplit (Kran + Sipon ) Lux unit 2,310,000.00 350,000.00 180,000.00
M.181 Waterdrain bh 47,250.00 12,000.00
M.182 Ubin pc abu-abu 20 x 20 cm bh 2,100.00 65,000.00
M.182.a Ubin pc abu-abu 30 x 30 cm bh/dus 6 lembar 3,400.00 43,000.00 55,000.00
M.182.b Ubin pc abu-abu 40 x 40 cm bh 4,079.25 45,000.00
M.183 Ubin Granit 30 x 30 cm bh 36,800.00 37,000.00 49,000.00
M.183.a Ubin Granit 40 x 40 cm bh 62,874.00 52,000.00
M.184 Ubin Porselen bh 2,100.00
M.185 Ubin Teralux 30 x 30 cm bh 52,995.60 45,000.00
M.185.a Ubin Teralux 40 x 40 cm bh 61,794.60 50,000.00
M.185.b Ubin Teralux kerang 40 x 40 cm bh 11,550.00 55,000.00
M.185.c Ubin Teralux kerang30 x 30 cm bh 10,500.00 50,000.00
M.186 Ubin Teralux marmer 30 x 30 cm bh 71,085.00 50,000.00
M.186.a Ubin Teralux marmer 40 x 40 cm bh 84,735.00 59,000.00
M.186.b Ubin Teralux marmer 60 x 60 cm bh 115,290.00 75,000.00
M.187 Ubin Teraso 30 x 30 cm bh 5,040.00 48,000.00
M.187.a Ubin Teraso 40 x 40 cm bh 7,140.00 53,000.00
M.188 Ubin warna 20 x 20 cm bh 3,675.00
M.188.a Ubin warna 30 x 30 cm bh 10,185.00 43,000.00
M.188.b Ubin warna 40 x 40 cm bh 26,145.00 45,000.00
M.189 Ubin Keramik 10 x 33 cm bh 6,825.00
M.189.a Ubin Keramik 20 x 20 cm doos 49,875.00 47,500.00
M.189.b Ubin Keramik 30 x 30 cm doos 52,815.00 37,000.00 35,000.00
M.189.c Ubin Keramik 33 x 33 cm doos 63,000.00 60,000.00
M.190 Ubin Keramik artistik 10 x 20 cm bh 15,750.00
M.190.a Ubin Keramik artistik 10 x 10 cm atau 5 cm x 20 cm bh 15,750.00
M.191 Ubin keramik Mozaik 30 x 30 cm bh 21,000.00
M.192 Keramik artistik 5 cm x 20 cm bh 14,910.00
M.192.a Keramik artistik 10 x 20 cm bh 14,910.00
M.192.b Keramik artistik 20 cm x 20 cm bh 57,960.00
M.192.c Keramik Lantai 20 x 20 cm putih bh 3,255.00 2,000.00 20,000.00
M.192.d Keramik Lantai 20 x 20 cm warna/motif bh 3,675.00
M.192.e Keramik Lantai KM 20 x 20 cm bh 3,400.00 15,000.00
M.192.f Keramik Lantai 30 x 30 cm putih bh 6,814.50 3,636.36 12,000.00 50,000.00
M.192.g Keramik Lantai 30 x 30 cm warna/motif bh 8,799.00 4,727.27 49,000.00
M.192.h Keramik Lantai 40 x 40 cm unpolish bh 19,110.00 45,000.00 55,000.00
M.192.i Keramik Lantai 40 x 40 cm bh 22,708.35 49,000.00
M.192.j Keramik Dinding 20 x 25 cm bh 6,930.00
M.192.k Keramik Lantai 5 x 30 cm warna/motif (potongan) bh 1,575.00
M.192.l Keramik Lantai 5 x 40 cm warna/motif (potongan) bh 2,625.00
M.192.m Keramik Dinding 20 x 40 bh 10,080.00 60,000.00
M.192.n Keramik Dinding 20 x 60 bh 19,320.00 79,000.00
M.193 Porselin 11 x 11 bh 1,575.00
M.193.a Porselin 11 x 11 cm doos 16,065.00
M.193.b Porselin 10 x 20 cm bh 1,680.00
M.193.c Porselin 20 x 20 cm bh 1,785.00
M.193.d Porselin 15 x 15 cm putih bh 1,600.00
M.193.e Porselin 11 x 11 cm warna m2 1,995.00
M.193.f Porselin 15 x 15 cm warna bh 1,600.00
M.193.g Porselin 20 x 20 cm warna bh 3,400.00
M.193.h Porselin 10 x 20 cm warna bh 1,600.00
M.194 Teraso Cor m3 338,300.00
M.195 Plint ubin pc abu-abu 10 x 30 cm bh 5,400.00
M.195.a Plint ubin pc abu-abu 10 x 40 cm bh 7,140.00
M.195.b Plint ubin pc abu-abu 15 x 20 cm bh 5,040.00
M.196 Plint ubin pc warna 10 x 20 cm bh 3,000.00
M.196.a Plint ubin pc warna 10 x 30 cm bh 4,300.00
M.196.b Plint ubin pc warna 10 x 40 cm bh 7,140.00
M.197 Plint Ubin Terasso 10 x 30 cm bh 6,800.00
M.197.a Plint Ubin Terasso 10 x 40 cm bh 9,700.00
M.198 Plint ubin teralux marmer 10 x 30 cm bh 14,910.00
M.198.a Plint ubin teralux marmer 10 x 40 cm bh 21,945.00
M.198.b Plint ubin teralux marmer 10 x 60 cm bh 26,250.00
M.199 Plint teralux kerang 10 x 30 bh 26,250.00
M.199.a Plint teralux kerang 10 x 40 bh 31,500.00
M.199.b Keramik ukuran 60 x 60 bh 78,750.00 56,000.00
M.199.c Keramik Granit ukuran 60 x 60 (cina) bh 105,000.00 93,000.00
M.200 Plint Ubin Granit 10 x 30 cm bh 14,200.00
M.200.a Plint Ubin Granit 10 x 40 cm bh 20,900.00
M.201 Plint keramik 5 x 20 cm bh 10,500.00
M.201.a Plint keramik 10 x 10 cm bh 13,125.00
M.201.b Plint keramik 10 x 20 cm bh 13,125.00
M.201.c Plint Keramik Lantai 10 x 30 cm bh 14,200.00
M.201.d Plint Keramik Lantai 10 x 40 cm bh 26,500.00
M.202 Marmer bh 89,250.00
M.202.a Marmer 100x100 cm bh 638,400.00
M.203 Marmer ukuran 10x10 cm tulisan graphir bh 36,750.00
M.203.a Marmer ukuran 12x12 cm tulisan graphir bh 47,250.00
M.204 Floor drain unit 47,250.00
M.205 Nok genteng aspal bh 66,847.20
M.206 Nok genteng beton bh 11,779.95
M.207 Nok genteng metal bh 149,023.35
M.208 Nok paten 92 cm lbr 63,015.75
M.209 Nok standar 40 x 18 bh 15,750.00
M.210 Pipa Baja Ø 63 mm bh 326,550.00
M.210.a Pipa Baja Ø 63 mm m 54,600.00
M.210.b Pipa Baja Ø 100 mm bh 811,125.00
M.210.c Pipa Baja Ø 100 mm m 135,240.00
M.210.d Pipa Baja Ø 125 mm bh 1,303,995.00
M.210.e Pipa Baja Ø 125 mm m 217,350.00
M.210.f Pipa Baja Ø 150 mm bh 1,692,495.00
M.210.g Pipa Baja Ø 150 mm m 282,082.50
M.210.h Pipa Baja Ø 200 mm bh 2,542,470.00
M.210.i Pipa Baja Ø 200 mm m 423,780.00
M.210.j Pipa Baja Ø 250 mm bh 3,603,285.00
M.210.k Pipa Baja Ø 250 mm m 600,600.00
M.210.l Pipa Baja Ø 300 mm bh 4,768,680.00
M.210.m Pipa Baja Ø 300 mm m 794,850.00
M.210.n Pipa Baja Ø 400 mm bh 8,996,000.00
M.210.o Pipa Baja Ø 400 mm m 2,432,000.00
M.210.w Pipa Baja Ø 800 mm m
M.210.x Pipa Baja Ø 900 mm bh
M.210.y Pipa Baja Ø 900 mm m
M.210.z Pipa Baja Ø 1000 mm bh
M.210.aa Pipa Baja Ø 1000 mm m
M.210.ab Pipa Baja Ø 1100 mm bh
M.210.ac Pipa Baja Ø 1100 mm m
M.210.ad Pipa Baja Ø 1200 mm bh
M.210.ae Pipa Baja Ø 1200 mm m
M.211 Pipa Beton Ø 15 - 20 cm bh
M.211.a Pipa Beton Ø 30 - 100 cm bh
M.212 Pipa black steel 6" m
M.212.a Pipa black steel 8" m
M.213 Pipa DCI Ø 100 mm bh 630,840.00
M.213.a Pipa DCI Ø 100 mm m 157,710.00
M.213.b Pipa DCI Ø 125 mm bh 818,580.00
M.213.c Pipa DCI Ø 125 mm m 204,645.00
M.213.d Pipa DCI Ø 150 mm bh 1,338,960.00
M.213.e Pipa DCI Ø 150 mm m 334,740.00
M.213.f Pipa DCI Ø 200 mm bh 2,086,560.00
M.213.g Pipa DCI Ø 200 mm m 521,640.00
M.213.h Pipa DCI Ø 250 mm bh 3,251,640.00
M.213.i Pipa DCI Ø 250 mm m 812,910.00
M.213.j Pipa DCI Ø 300 mm bh 5,160,120.00
M.213.k Pipa DCI Ø 300 mm m 1,290,030.00
M.213.l Pipa DCI Ø 400 mm bh
M.213.m Pipa DCI Ø 400 mm m 2,249,000.00
M.213.n Pipa DCI Ø 450 mm bh
M.213.o Pipa DCI Ø 450 mm m 2,600,000.00
M.213.p Pipa DCI Ø 500 mm bh
M.213.q Pipa DCI Ø 500 mm m 2,925,000.00
M.213.r Pipa DCI Ø 600 mm bh
M.213.s Pipa DCI Ø 600 mm m 3,360,500.00
M.213.t Pipa DCI Ø 800 mm bh
M.213.u Pipa DCI Ø 800 mm m 4,498,000.00
M.213.v Pipa DCI Ø 900 mm bh
M.213.w Pipa DCI Ø 900 mm m 4,940,000.00
M.213.x Pipa DCI Ø 1000 mm bh
M.213.y Pipa DCI Ø 1000 mm m 5,616,000.00
M.213.z Pipa DCI Ø 1100 mm bh
M.213.aa Pipa DCI Ø 1100 mm m 6,142,500.00
M.213.ab Pipa DCI Ø 1200 mm bh
M.213.ac Pipa DCI Ø 1200 mm m 6,747,000.00
M.214 Pipa Galvanis Ø 1/2 " bh
M.214.a Pipa Galvanis Ø 1/2 " m 66,900.00
M.214.b Pipa Galvanis Ø 3/4 " bh
M.214.c Pipa Galvanis Ø 3/4 " m 86,600.00
M.214.d Pipa Galvanis Ø 1" bh
M.214.e Pipa Galvanis Ø 1" m 117,900.00
M.214.f Pipa Galvanis Ø 1.5 " bh
M.214.g Pipa Galvanis Ø 1.5 " m 159,100.20
M.214.h Pipa Galvanis Ø 1.6 " bh
M.214.i Pipa Galvanis Ø 1.6 " m
M.214.j Pipa Galvanis Ø 3 " bh
M.214.k Pipa Galvanis Ø 3 " m 337,359.75
M.214.l Pipa Galvanis Ø 4 " bh
M.214.m Pipa Galvanis Ø 4 " m 529,200.00
M.214.n Pipa Galvanis Ø 1.5 ", tebal 2 mm bh
M.214.o Pipa Galvanis Ø 1.5 ", tebal 2 mm m 151,524.00
M.214.p Pipa Galvanis Ø 2 ", tebal 2.3 mm bh
M.214.q Pipa Galvanis Ø 2 ", tebal 2.3 mm m 226,230.90
M.214.r Pipa Galvanis Ø 2.5 ", tebal 2.5 mm bh
M.214.s Pipa Galvanis Ø 2.5 ", tebal 2.5 mm m 315,929.25
M.214.t Pipa Galvanis Ø 3 ", tebal 2.5 mm bh
M.214.u Pipa Galvanis Ø 3 ", tebal 2.5 mm m 321,295.00
M.214.v Pipa Galvanis Ø 4 ", tebal 2.8 mm bh
M.214.w Pipa Galvanis Ø 4 ", tebal 2.8 mm m 437,810.00
M.215.a Pipa GIP Ø 63 mm bh 708,960.00
M.215.b Pipa GIP Ø 63 mm m 177,240.00
M.215.c Pipa GIP Ø 100 mm bh 1,417,500.00
M.215.d Pipa GIP Ø 100 mm m 354,375.00
M.215.e Pipa GIP Ø 125 mm bh 1,753,500.00
M.215.f Pipa GIP Ø 125 mm m 438,375.00
M.215.g Pipa GIP Ø 150 mm bh 2,271,780.00
M.215.h Pipa GIP Ø 150 mm m 567,945.00
M.215.i Pipa GIP Ø 200 mm bh 3,223,500.00
M.215.j Pipa GIP Ø 200 mm m 805,875.00
M.215.k Pipa GIP Ø 250 mm bh 4,328,100.00
M.215.l Pipa GIP Ø 250 mm m 1,082,025.00
M.215.m Pipa GIP Ø 300 mm bh 7,207,620.00
M.215.n Pipa GIP Ø 300 mm m 1,801,905.00
M.217.a Pipa PVC Ø 63 mm bh 152,985.00
M.217.b Pipa PVC Ø 63 mm m 38,325.00
M.217.c Pipa PVC Ø 90 mm bh 233,100.00
M.217.d Pipa PVC Ø 90 mm m 58,275.00
M.217.e Pipa PVC Ø 110 mm bh 360,360.00
M.217.f Pipa PVC Ø 110 mm m 90,090.00
M.217.g Pipa PVC Ø 150 mm bh 708,330.00
M.217.h Pipa PVC Ø 150 mm m 177,135.00
M.217.i Pipa PVC Ø 200 mm bh 1,071,210.00
M.217.j Pipa PVC Ø 200 mm m 267,855.00
M.217.k Pipa PVC Ø 250 mm bh 1,632,120.00
M.217.l Pipa PVC Ø 250 mm m 408,030.00
M.217.m Pipa PVC Ø 300 mm bh 2,315,565.00
M.217.n Pipa PVC Ø 300 mm m 578,970.00
M.218.a Pipa PVC tipe AW Ø 1/2 " m 13,909.35 7,250.00 7,250.00 7,375.00 6,750.00 7,250.00 7,500.00 6,250.00 7,000.00 7,000.00 7,500.00 7,375.00 7,125.00 7,250.00 6,750.00 7,000.00 7,625.00 7,000.00 7,500.00 7,375.00 7,500.00 29,000.00 7,000.00 7,375.00 8,750.00 7,500.00 7,375.00 6,750.00 7,500.00 7,875.00 20,000.00 7,250.00 20,500.00 7,250.00 8,000.00 7,000.00 26,000.00 6,250.00 6,250.00 6,500.00 7,000.00 6,750.00 6,875.00 3,750.00 7,000.00 7,000.00 7,000.00 7,250.00 7,500.00 6,250.00 6,500.00 6,875.00 7,000.00 6,750.00 6,875.00 6,875.00 6,875.00 6,875.00 6,500.00 6,000.00
M.218.b Pipa PVC tipe AW Ø 3/4 " bh
M.218.c Pipa PVC tipe AW Ø 3/4 " m 20,578.95 8,500.00 8,750.00 8,250.00 8,000.00 8,500.00 8,750.00 7,750.00 6,550.00 8,125.00 8,000.00 8,125.00 8,000.00 8,500.00 7,875.00 9,250.00 8,500.00 8,125.00 8,500.00 8,750.00 8,375.00 35,000.00 7,500.00 8,500.00 9,250.00 8,125.00 7,625.00 8,250.00 8,375.00 8,875.00 20,000.00 8,250.00 28,000.00 8,250.00 9,250.00 8,500.00 35,000.00 7,750.00 7,500.00 8,000.00 9,000.00 8,000.00 5,500.00 5,000.00 8,750.00 8,750.00 8,750.00 9,000.00 8,750.00 7,500.00 8,500.00 18,750.00 8,250.00 8,250.00 8,375.00 8,125.00 8,125.00 8,125.00 9,000.00 7,500.00
REKAP BAHAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 79 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 66 68 69 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 62 71 52 53 54 55 56 57 83 58
Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kedung Kecamatan
Kecamatan Lowokwaru
Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kandang Klojen
Badung Kel.
Pisang Candi Badung Gadang Bndulan Bandulan Kel. Kel. Arjosari Kd. Baleajosari Kel. Kel. Kel. Jodipan Kel.Bumiayu
Mulyorejo Kebonsari Kebonsari Kebonsari Tejosari Tanjung Tejo Tunjungrejo Mulyorejo Kebonsari Tulusrejo Mulyoagung Mulyoagung Dinoyo Tunggulwulung Tlogomas Merjosari Kec. Lowok Kd. Polowijen Kel. Arjosari Kd. Baleajosari Kel. Kesatrian Kel. Bunulrejo Kel. Polehan Kel. Kejalrian Kel. Bunud Purwantoro Kel polowijen Jl. Rais (UD. Kel. Bumiayu (Mitra Mangliawan Pakis Kel. Tlogowaru (Ud. Kel. Arjowinangan Arjowinangun (Akbar Bareng ( Kawi
KODE NAMA BAHAN SATUAN HARGA 2018 Kec.Sukun Tejosari (Rajawali (Makmur Jaya (Sumber Kel. Tlogowaru UD. Ringin Agung Toko Masjhur Purwantoro (Tb. Mangun (Tb Utama Pandanwangi Pandanwangi Kota Lama Kec.Kedung Kandang Toko Cahaya Alam
(Makmur Jaya) (Sader Jaya) (Tunggul Jaya) (Masjhur) Kec.Sukun (Bedak Willys) (Mirah Rejeki) (Berkah Abadi) (Mely Jaya 2) Dinoyo Tasik Madu Tasik Madu Tulusrejo Mojolangu Jatimulyo (Prakasa Jatimulyo Lowokwaru Lowokwaru Merjosari Dinoyo (Sinar Dawuh (Ud. Merjosari (Ud.Atika Merjosari (TB Mandiri (Mat ahari) (Mayang Tunjung Sekar Tunjung Sekar Waru (AJ) (Kendedes) (SumberJaya) (Tb Barokah) (Rezza Jaya) (Sumber Alam) (Horas Jaya) (Moza I I) (Arjosari Jaya) (Manis (molyo) Djawa Baru) Karya) (R.J.A) Bumi Prakasa) (Anugrah) Jaya) Jaya)
(Rizky) (Rizky) Jaya) Abadi) Barokah) (Cahaya Alam) Berjaya) Jaya) (Gio Jaya) (Jati Utomo) (Ud. Koesnadi) (MJ)
(Supralon) (Ahmad Ning) (Bangun Jaya) (Budi Jaya) (Usaha Jaya) (Cahaya Alam) (Mulyo Joyo) Lunas) (Sederhana) (Mawar) (Ud.Cempaka) (Abadi) (Dinoyo Jaya) Sengkaling) Sidomakmur) (Barokah) Jaya) (LAM) Jaya) Grand) (Nona Jaya) (Tb Gemilang) Sentosa)
M.218.d Pipa PVC tipe AW Ø 1" bh
M.218.e Pipa PVC tipe AW Ø 1" m 26,966.10 10,500.00 11,250.00 10,000.00 10,000.00 10,625.00 10,750.00 9,500.00 5,925.00 10,250.00 10,625.00 10,625.00 10,375.00 40,000.00 10,500.00 10,125.00 10,500.00 11,125.00 10,000.00 11,250.00 10,875.00 10,750.00 45,000.00 8,750.00 11,500.00 11,250.00 10,375.00 10,375.00 10,500.00 11,375.00 10,750.00 20,000.00 11,250.00 38,000.00 11,000.00 10,500.00 9,500.00 45,000.00 9,625.00 13,750.00 9,750.00 10,500.00 9,750.00 8,000.00 6,250.00 9,500.00 10,000.00 11,250.00 11,250.00 11,250.00 10,000.00 9,750.00 18,750.00 10,250.00 10,000.00 10,625.00 9,750.00 10,000.00 9,375.00 11,500.00 9,500.00
M.218.f Pipa PVC tipe AW Ø 1.5 " bh
M.218.g Pipa PVC tipe AW Ø 1.5 " m 36,191.40 18,500.00 18,125.00 18,000.00 17,875.00 18,125.00 15,125.00 18,875.00 18,750.00 18,750.00 18,250.00 18,500.00 18,125.00 18,500.00 18,750.00 18,125.00 18,750.00 18,625.00 18,250.00 84,000.00 18,750.00 11,250.00 183,750.00 17,875.00 17,750.00 11,250.00 18,125.00 20,000.00 11,000.00 65,000.00 12,250.00 10,500.00 80,000.00 13,625.00 14,000.00 20,000.00 7,500.00 11,250.00 7,000.00 11,750.00 13,750.00 12,500.00 10,500.00 19,500.00 10,625.00 14,000.00 17,750.00
M.218.h Pipa PVC tipe AW Ø 2 " bh
M.218.i Pipa PVC tipe AW Ø 2 " m 45,984.75 23,075.00 11,875.00 27,250.00 26,625.00 26,875.00 12,250.00 26,750.00 20,000.00 11,750.00 83,000.00 11,750.00 12,000.00 48,000.00 30,000.00 9,250.00 13,750.00 8,750.00 13,750.00 10,750.00 15,000.00 11,000.00 11,875.00 16,500.00
M.218.j Pipa PVC tipe AW Ø 2.5 " bh
M.218.k Pipa PVC tipe AW Ø 2.5 " m 58,899.75 28,825.00 14,875.00 33,750.00 33,125.00 33,375.00 14,750.00 33,375.00 20,000.00 14,500.00 121,000.00 14,500.00 9,250.00 60,000.00 37,500.00 11,250.00 13,500.00 11,250.00 14,500.00 13,750.00 21,250.00 13,500.00 13,125.00 19,000.00
M.218.l Pipa PVC tipe AW Ø 3 " bh
M.218.m Pipa PVC tipe AW Ø 3 " m 83,169.45 49,500.00 49,250.00 48,750.00 49,500.00 42,250.00 50,000.00 150,000.00 49,500.00 48,750.00 49,500.00 48,750.00 49,250.00 49,125.00 49,375.00 25,000.00 13,000.00 47,500.00 46,750.00 46,625.00 13,125.00 47,375.00 30,000.00 12,750.00 170,000.00 20,000.00 17,500.00 70,000.00 53,750.00 14,250.00 16,250.00 15,000.00 16,250.00 19,500.00 32,500.00 16,250.00 14,375.00 19,750.00
M.218.n Pipa PVC tipe AW Ø 4 " bh
M.218.o Pipa PVC tipe AW Ø 4 " m 130,004.70 71,250.00 70,000.00 70,000.00 70,000.00 59,850.00 71,750.00 71,375.00 71,250.00 71,125.00 280,000.00 71,250.00 71,250.00 70,000.00 71,250.00 71,125.00 46,750.00 320,000.00 70,875.00 23,500.00 37,500.00 37,250.00 37,500.00 23,750.00 37,250.00 40,000.00 23,250.00 282,000.00 22,500.00 22,500.00 88,000.00 77,500.00 16,250.00 21,250.00 22,500.00 21,250.00 21,250.00 62,500.00 20,250.00 13,125.00 21,250.00
M.218.p Pipa PVC tipe D Ø 3 " m1 226,373.70 27,500.00 27,500.00 26,875.00 26,250.00 23,750.00 28,000.00 27,750.00 27,375.00 27,625.00 76,000.00 27,500.00 28,500.00 26,250.00 29,000.00 28,750.00 27,750.00 120,000.00 28,000.00 30,500.00 27,250.00 26,625.00 26,250.00 28,750.00 30,250.00 26,875.00 30,000.00 92,500.00 29,000.00 28,750.00 16,875.00
M.218.q Pipa PVC tipe D Ø 4 " m1 301,168.35 38,250.00 37,500.00 37,500.00 37,500.00 33,250.00 38,000.00 38,000.00 38,000.00 38,500.00 38,250.00 38,875.00 37,500.00 38,500.00 38,750.00 38,000.00 170,000.00 38,750.00 39,625.00 40,000.00 39,750.00 39,250.00 145,000.00 39,250.00 38,750.00
M.218.r Pipa PVC tipe AW Ø 6 " m1 46,693.50 122,400.00 626,500.00
M.218.s Pipa PVC tipe AW Ø 8 " m1 57,054.90 190,350.00 1,051,500.00
M.218.t Pipa PVC tipe D Ø 1/2 " m1 6,400.00
M.218.u Pipa PVC tipe D Ø 3/4 " m1 9,083.55
M.218.v Pipa PVC tipe D Ø 1" m1 11,779.95 19,000.00
M.218.w Pipa PVC tipe D Ø 1.5 " m1 18,167.10 10,500.00 10,000.00 8,175.00 10,250.00 10,500.00 10,250.00 10,625.00 10,500.00 10,500.00 10,750.00 10,000.00 10,625.00 10,625.00 10,250.00 10,375.00 11,250.00 11,500.00 10,000.00 22,500.00 9,875.00 7,500.00 9,250.00 8,500.00
M.218.x Pipa PVC tipe D Ø 2 " m1 18,875.85 13,750.00 13,375.00 - 14,125.00 14,000.00 14,000.00 13,875.00 13,750.00 13,250.00 13,625.00 13,250.00 14,000.00 13,875.00 13,500.00 13,875.00 13,000.00 42,500.00 18,625.00 14,000.00 13,750.00 10,000.00 13,875.00 10,625.00 9,500.00 13,000.00 12,500.00
M.218.y Pipa PVC tipe D Ø 2.5 " m1 32,217.15 19,250.00 18,750.00 16,300.00 19,375.00 18,750.00 19,375.00 19,000.00 19,250.00 18,750.00 19,125.00 18,750.00 19,250.00 18,875.00 19,625.00 19,750.00 54,000.00 12,625.00 14,750.00 21,250.00 12,500.00 27,500.00 20,500.00 12,500.00 10,625.00 19,750.00 13,250.00
M.218.z Pipa PVC tipe D Ø 3 " m1 46,693.50 27,500.00 27,625.00 27,375.00 27,375.00 27,125.00 27,500.00 26,375.00 28,000.00 26,875.00 27,875.00 28,125.00 27,375.00 27,125.00 62,500.00 26,875.00 16,250.00 27,500.00 12,500.00 29,500.00 15,000.00 11,875.00 27,500.00 15,625.00
M.218.aa Pipa PVC tipe D Ø 4 " m1 57,054.90 38,250.00 37,750.00 38,000.00 38,125.00 38,000.00 38,250.00 38,375.00 38,750.00 38,250.00 38,625.00 38,875.00 38,375.00 38,750.00 80,500.00 26,875.00 19,750.00 37,500.00 15,000.00 37,500.00 41,625.00 19,250.00 13,125.00 38,000.00 19,625.00
M.218.ab Pipa PVC tipe C Ø 1/2 " m1 5,000.00 37,500.00
M.218.ac Pipa PVC tipe C Ø 3/4 " m1 7,400.00 50,000.00
M.218.ad Pipa PVC tipe C Ø 1" m1 8,941.80
M.218.ae Pipa PVC tipe C Ø 1.5 " m1 11,921.70 7,500.00 8,750.00
M.218.af Pipa PVC tipe C Ø 2 " m1 18,308.85 11,500.00 11,500.00 10,875.00 11,375.00 11,625.00 11,625.00 11,625.00 11,500.00 11,750.00 11,000.00 11,250.00 11,500.00 11,750.00 49,000.00 11,500.00 11,250.00 10,000.00 12,000.00 12,500.00 11,000.00
M.218.ag Pipa PVC tipe C Ø 2.5 " m1 23,276.40 14,250.00 14,250.00 13,750.00 14,625.00 14,500.00 14,625.00 14,250.00 14,250.00 13,875.00 14,250.00 13,875.00 14,375.00 14,375.00 62,000.00 14,375.00 15,000.00 10,000.00 14,500.00 15,000.00 14,000.00
M.218.ah Pipa PVC tipe C Ø 3 " m1 27,534.15 16,500.00 16,500.00 15,625.00 16,750.00 16,750.00 16,375.00 16,250.00 16,500.00 16,875.00 16,375.00 17,000.00 16,750.00 16,875.00 72,000.00 16,250.00 18,750.00 11,250.00 17,250.00 16,250.00 15,750.00
M.218.ai Pipa PVC tipe C Ø 4 " m1 35,056.35 21,000.00 21,750.00 20,625.00 21,500.00 21,250.00 92,000.00 21,250.00 12,500.00 21,000.00 21,250.00 20,750.00
M.218.aj Pipa PVC 5/8" Ljr 11,500.00 9,000.00 11,000.00 9,500.00 10,500.00 10,000.00 9,000.00 9,000.00 7,000.00 10,000.00
M.218.ak Pipa Screen PVC tipe AW Ø 6 " m1 240,991.80
M.218.al Pipa PVC tipe AW Ø 5 " m1 226,373.70
M.218.am Pipa Screen PVC tipe AW Ø 5 " m1 198,556.05
M.218.an Pipa PVC moof 6 m S - 12,5 Ø 4" m1 137,953.20 102,300.00
M.218.ao Pipa PVC moof 6 m S - 12,5 Ø 6" m1 297,903.90 218,800.00
M.218.ap Pipa PVC moof 6 m S - 12,5 Ø 8" m1 482,408.85 410,325.00
M.218.aq Pipa PVC moof 6 m S - 12,5 Ø 2" m1 45,274.95 33,850.00
M.218.ar Pipa PVC moof 6 m S - 12,5 Ø 2,5" m1 63,157.50 48,375.00
M.218.as Pipa PVC moof 6 m S - 12,5 Ø 3" m1 93,955.05 69,900.00
M.219 Pipa Listrik 5/8" btg 12,600.00 6,000.00 9,000.00 8,500.00
M.219.a RCP Ø 400 mm, Type RJ, Cls-2 AS m1 800,625.00
M.219.b RCP Ø 500 mm, Type RJ, Cls-2 AS m1 1,321,687.50
M.219.c RCP Ø 600 mm, Type RJ, Cls-2 AS m1 1,725,255.00
M.219.d RCP Ø 800 mm, Type RJ, Cls-2 AS m1 2,428,125.00
M.219.e RCP Ø 1050 mm, Type RJ, Cls-2 AS m1 4,560,937.50
M.219.f Pipa Arde m1 543,300.00
M.219.g Splits Dia 1 " bh 403,600.00
M.220.a Pipa Ø 80 mm bh 12,600.00
M.220.b Pipa Ø 100 mm bh 21,000.00
M.220.c Pipa Ø 150 mm bh 63,982.80
M.220.d Pipa Ø 200 mm bh 63,982.80
M.220.e Pipa Ø 250 mm bh 124,110.00
M.220.f Pipa Ø 300 mm bh 166,479.60
M.221 Pipa saunding GIP 1" + Asesoris - 126,000.00
M.222 Pipa Tanah bh 96,600.00
M.222.a Pipa Tanah Ø 15 cm bh 96,600.00
M.223 Tee Ø 150 mm bh 1,155,000.00 3,000.00 12,000.00 4,000.00
M.223.a Tee Ø 200 mm bh 2,100,000.00 4,000.00 13,000.00 5,000.00
M.223.b Tee Ø 250 mm bh 4,200,000.00 6,000.00 14,500.00 6,000.00 3,000.00
M.223.c Tee Ø 300 mm bh 5,775,000.00 14,000.00 16,000.00 7,000.00 3,000.00
M.223.n L Bow bh 5,250.00 25,000.00 3,500.00 6,000.00 2,500.00
M.223.o Knee PVC Ø 3 " bh 9,240.00 9,000.00 10,000.00 9,500.00 13,000.00 15,000.00 3,000.00
M.223.p Knee PVC Ø 4 " bh 15,645.00 15,000.00 15,000.00 14,500.00 26,000.00 20,000.00 4,000.00
M.224 Valve Ø 150 mm bh 2,113,125.00 35,000.00
M.224.a Valve Ø 200 mm bh 7,350,000.00 40,000.00
M.224.b Valve Ø 250 mm bh 9,450,000.00
M.224.c Valve Ø 300 mm bh 13,125,000.00
M.224.j Valve Ø 1100 mm bh
M.224.k Valve Ø 1200 mm bh
M.225 Pipa Porus m 38,850.00
M.225.a Water stop PVC lebar 150 mm m 69,300.00
M.225.b Water stop PVC lebar 200 mm m 112,350.00
M.226 Water stop PVC lebar 230 - 320 mm m 131,250.00
M.226.a Waterstop Lebar 150 mm m 69,300.00
M.226.b Waterstop Lebar 200 mm m 112,350.00
M.226.c Waterstop Lebar 230 mm - 320 mm m 131,250.00
M.226.d Stop Kran Ø 1/2" bh 44,100.00 15,000.00 25,000.00 10,000.00 90,000.00
M.226.e Box Water Meter (plat tebal 1 mm) bh 131,250.00
M.227 Rubber water stop lebar 150 - 200 mm m 76,230.00
M.228 Kran Air bh 65,835.00 23,000.00 20,500.00 25,000.00 23,000.00 20,000.00 23,000.00 18,500.00 21,500.00 50,000.00 28,000.00
M.228.a Kran Air Ø 1/2" bh 65,835.00 25,000.00 20,000.00 26,000.00 20,000.00 20,000.00 10,000.00 22,500.00 25,500.00 27,000.00 24,000.00 23,500.00 25,500.00 25,000.00 25,000.00 22,000.00 27,000.00 27,000.00 26,500.00 26,500.00 65,000.00 26,000.00 25,500.00 30,000.00 30,500.00 20,500.00 23,000.00 26,500.00 30,000.00 40,000.00 25,000.00 48,000.00 38,000.00 20,000.00 42,000.00 35,000.00 100,000.00 65,000.00 12,500.00 8,000.00 25,000.00 40,000.00 25,000.00 27,000.00 42,500.00 20,000.00 15,000.00 50,000.00 19,500.00 37,500.00 12,000.00 5,000.00 35,000.00 37,000.00
M.228.b Kran Air Ø 3/4" bh 71,295.00 28,000.00 25,000.00 25,000.00 25,000.00 15,000.00 25,000.00 27,500.00 29,000.00 27,500.00 29,000.00 28,000.00 28,000.00 25,000.00 29,000.00 28,500.00 29,000.00 29,000.00 27,000.00 31,000.00 35,000.00 41,500.00 31,500.00 31,000.00 41,500.00 45,000.00 30,000.00 50,000.00 43,000.00 20,000.00 50,000.00 39,000.00 35,000.00 100,000.00 35,000.00 55,000.00 50,000.00 25,000.00 25,000.00 47,500.00 22,500.00 50,000.00 35,000.00 9,000.00 20,000.00 15,000.00 7,000.00 20,000.00
M.229 Shock PVC Ø 3 " bh 28,493.18 15,000.00 6,000.00 26,000.00 23,000.00 25,000.00 40,500.00 25,500.00 25,000.00 9,000.00 24,000.00 15,000.00 42,000.00
M.229.a Shock PVC Ø 4 " bh 30,354.55 15,500.00 3,000.00 10,000.00 34,000.00 32,000.00 35,500.00 25,000.00 35,000.00 35,500.00 12,000.00 33,000.00 20,000.00
M.230 Sealtape bh 5,072.55 3,000.00 3,000.00 3,500.00 2,500.00 2,000.00 3,500.00 2,500.00 3,000.00 3,000.00 4,000.00 3,000.00 5,000.00 4,000.00 1,000.00 4,000.00 5,000.00 3,000.00 4,000.00
M.230.a Air ltr 52.50
M.230.b Air m3 52,500.00
M.231 Air test (Air bersih) m3 1,050.00
M.232 1 buah jerrigen 1 ltr, 2 buah botol 250 ml set 26,250.00
M.232.a Bahan Bakar ltr 8,000.00
M.232.b BBM Non Subsidi ltr 10,857.00
M.232.c Solar ltr 10,762.50
M.232.d Solar non subsidi ltr 11,025.00
M.233 Oli (Minyak pelumas) ltr 45,990.00
M.234 Oli mesin (diesel) ltr 41,790.00
M.235 Oli SAE 20 ltr 70,350.00
M.235.a Oli SAE 40 ltr 35,490.00
M.235.b Oli SAE 90 ltr 31,762.50
M.236 Teak oli ltr 63,000.00
M.237 Minyak tanah ltr 15,750.00
M.237.a Minyak Fluks Liter 10,395.00
M.237.b Minyak bekesting ltr 4,830.00
M.237.c Bunker Oil Liter 4,200.00
M.237.d Minyak Cat Ltr 31,600.00
M.238 Anchorage buah 1,039,500.00
M.239 Mata Kucing buah 87,570.00
M.240 Kerosene ltr 12,600.00
M.241 Residu atau Teer ltr 50,900.00
M.242 Resin tube 105,000.00 A=20.000 / lideng 24,000.00 7000 - 25.000
M.243 Thinner ltr 28,560.00 9,000.00 6,000.00 8,000.00 6,500.00 6,000.00 75,000.00 9,000.00 10,000.00 10,000.00 10,000.00 9,500.00 25,000.00 14,000.00 8,000.00 6,000.00 10,500.00 16,000.00 8,500.00 9,500.00 9,000.00 7,500.00 8,500.00 17,000.00 10,000.00 8,000.00 9,000.00 7,000.00 8000 / btl 20,000.00 30,000.00 16,000.00 8,000.00 6,000.00 9,000.00 25,000.00 10,000.00 10,000.00 10,000.00 20,000.00 17,000.00 10,000.00 6,500.00 6,000.00 12,000.00
M.243.a Thinner kg 29,000.00
M.244 Sealant Tube 25,462.50 38,500.00 35,000.00 10,000.00
M.244.a Sealant kg 157,500.00 5000 - 8000
M.244.b Joint Sealent kg 35,175.00
M.245 Stempet kg 47,250.00
M.246 Lem kg 21,000.00 40,000.00 12,000.00 8,000.00
M.246.a Lem Pipa PVC kg 58,600.00 40,000.00 41,500.00 40,500.00 40,500.00 40,000.00 8,000.00 39,000.00 39,000.00 41,000.00 42,000.00 41,500.00 10,000.00 40.000 / klg 40,000.00 14,000.00 42,000.00 38,000.00 41,500.00 41,000.00 40,500.00 37,000.00 39,000.00 46,500.00 19,000.00 12,500.00 12,500.00 11,000.00 47,000.00 46,000.00 45,000.00 8,000.00 8,000.00 8,500.00 36,000.00 8,000.00 12,500.00 55,000.00 8,000.00 40,000.00 42,500.00 40,000.00 10,000.00 8,000.00 8,000.00 10,000.00 7,500.00 6,500.00 35,000.00 10,000.00 38,000.00 37,500.00 40,000.00 40,000.00 9,000.00 7,000.00
M.247 Lem Kayu kg 64,500.00 13,000.00 10,000.00 12,500.00 10,000.00 12,000.00 12,500.00 13,500.00 11,500.00 12,500.00 15,000.00 12,500.00 15,000.00 13,000.00 13,000.00 14,500.00 12,500.00 14,000.00 15,000.00 12,500.00 14,000.00 15,000.00 18,000.00 16,500.00 15,500.00 12,000.00 18,500.00 17,500.00 17,000.00 13,000.00 12,000.00 12,000.00 34,000.00 15,000.00 12,500.00 13,000.00 12,500.00 12,500.00 25,000.00 12,000.00 12,000.00 12,000.00 12,500.00 45,000.00 13,500.00 13,000.00 42,500.00 12,000.00 12,500.00 12,500.00 12,500.00 12,000.00 25,000.00 12,000.00
M.248 Filler kg 3,675.00
M.249 Plamir kg 32,500.00 30,000.00 12,000.00
M.249.a Plamir Kayu kg 35,000.00 28,000.00 27,000.00 25,000.00 27,500.00 27,500.00 27,500.00 29,000.00 27,500.00 30,000.00 28,000.00 30,000.00 26,000.00 30,000.00 29,500.00 28,000.00 29,000.00 39,000.00 39,000.00 36,500.00 36,500.00 17,000.00 37,500.00 37,500.00 37,000.00 30,000.00 40,000.00 8,500.00 35,000.00 30,000.00 25,000.00 10,000.00 17,000.00 25,000.00 30,000.00 25,000.00 30,000.00 30,000.00 42,000.00 25,000.00 26,000.00 27,000.00 30,000.00
M.250 Politur ltr 110,250.00 80,000.00
M.250.a Politur Jadi ltr 110,250.00 72,500.00 80,000.00 70,000.00
M.251 Elastomer DM3 168,000.00 50,000.00
M.252 Woodstain kg 56,700.00
M.253 Cat kg 62,790.00 40,000.00 35,000.00
M.253.a Cat Dasar kg 79,905.00 185,000.00 125,000.00 180,000.00
M.253.b Cat Antara kg 79,905.00 85,000.00 30,000.00
M.253.c Cat Penutup kg 44,730.00
M.253.d Cat Menie kg 51,235.80 29,000.00 28,500.00 25,000.00 25,000.00 27,000.00 30,000.00 30,000.00 30,500.00 30,000.00 45,000.00 29,000.00 30,000.00 30,000.00 31,000.00 30,500.00 29,500.00 30,000.00
M.253.e Cat kayu kg 106,303.05 60,000.00 67,000.00 58,000.00 59,000.00 60,500.00 59,500.00 57,500.00 59,000.00 59,500.00 58,000.00 58,000.00 45,000.00 58,000.00 60,000.00 56,000.00 50,000.00 75,000.00 49,000.00 57,500.00 50,000.00 55,000.00 58,000.00 60,000.00 57,500.00 55,000.00 15,000.00 55,000.00 60,000.00 57,000.00 50,000.00 56,000.00 55,000.00 57,000.00 59,000.00 55,000.00
M.253.f Cat plafon m2 113,925.00 95,000.00 93,000.00 95,000.00 105,000.00 60,000.00 100,000.00
M.253.g Cat dinding m2 113,925.00 115,000.00 115,000.00 113,000.00 98,000.00 80,000.00 110,000.00 105,000.00 95,000.00 60,000.00 100,000.00 115,000.00 50,000.00 58,500.00 95,000.00 95,000.00
M.253.h Cat dinding kg 96,173.44 100,000.00 60,000.00 100,500.00 99,000.00 98,000.00 98,000.00 98,000.00 90,000.00 99,000.00 115,000.00 58,000.00 50,000.00 118,000.00 95,000.00 93,000.00 95,000.00
M.253.i Cat Dasar Kayu kg 71,400.00 61,000.00 63,500.00 60,000.00 59,000.00 60,500.00 61,500.00 60,000.00 58,000.00 115,000.00 30,000.00 59,000.00
M.253.j Cat Tembok Interior kg 131,250.00 90,000.00 113,000.00 115,000.00 115,000.00 115,000.00
M.253.k Cat Tembok Eksterior kg 183,750.00 170,000.00 180,000.00
M.253.l Waterproofing kg 225,750.00 95,000.00 83,000.00 83,500.00 86,000.00 85,500.00 85,000.00 85,000.00 95,000.00 87,000.00 86,500.00 83,500.00 87,000.00
M.253.m Cat dasar besi Kg 80,850.00 55,000.00 55,000.00
M.253.n Cat besi Kg 108,150.00 60,000.00 50,000.00 46,000.00 59,000.00 57,500.00 59,500.00 60,000.00 58,500.00 59,000.00 58,000.00 45,000.00 58,000.00 60,000.00 55,000.00 49,000.00 57,500.00 50,000.00 55,000.00 58,000.00 60,000.00 59,000.00 57,000.00 50,000.00 56,000.00 57,000.00 59,000.00 55,000.00
M.253.o Cat meni kayu kg 51,450.00 29,000.00 26,000.00 27,500.00 25,000.00 26,000.00 30,000.00 30,000.00 28,500.00 30,000.00 29,000.00 28,000.00 21,000.00 29,500.00 22,000.00 21,500.00 30,000.00 30,000.00 59,500.00 50,000.00 30,000.00
M.253.p Cat Anti Karat kg 46,436.25 45,000.00 43,000.00 43,000.00 42,000.00 42,500.00 26,500.00 46,500.00 44,000.00 46,000.00 44,000.00 45,000.00 45,000.00 46,000.00 43,500.00 44,000.00 45,000.00 44,000.00 44,000.00 60,000.00
M.253.q Menie A Kg 44,100.00 42,000.00 40,000.00
M.253.r Menie B Kg 17,850.00
M.253.s Cat dasar tembok Kg 20,700.00
M.254 Menie besi ltr 75,600.00 42,000.00 42,000.00 45,000.00
M.254.a Menie besi kg 78,750.00 45,000.00 45,000.00 45,000.00 47,000.00 46,000.00 45,500.00 46,000.00 45,000.00 45,000.00 44,000.00 46,500.00 44,000.00 47,000.00 46,000.00 46,000.00 46,000.00 33,000.00
M.255 Cat Marka Thermoplastik Kg 66,675.00 43,500.00
M.255.a Cat Marka Non Thermoplastik Kg 61,320.00
M.256 Ampelas lbr 52,080.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 3,500.00 5,000.00 4,500.00 5,500.00 5,000.00 6,000.00 6,000.00 4,000.00 5,000.00 4,000.00 4,000.00 11,000.00 4,500.00 4,000.00 3,500.00 6,000.00 7,000.00 6,000.00 6,000.00 5,000.00 6,000.00 6,000.00 4,000.00 5,500.00 5,000.00 10,000.00 10,000.00 8,000.00 10,000.00 6,000.00 3,500.00 4,000.00 5,000.00 5,000.00 8,000.00 9,000.00 10,000.00 4,000.00
M.256.a Ampelas halus m1 54,705.00 25,000.00 25,000.00 30,000.00 25,000.00 50,000.00 17,500.00 27,500.00 22,500.00 25,000.00 20,000.00 27,500.00 32,500.00 22,500.00 10,000.00 40,000.00 55,000.00 27,500.00 17,500.00 60,000.00 35,000.00 47,500.00 52,500.00 55,000.00 42,500.00 10,000.00 52,500.00 50,000.00 50,000.00 10,000.00 50,000.00 75,000.00 45,000.00 50,000.00 42,500.00 50,000.00 60,000.00 50,000.00 45,000.00 50,000.00 25,000.00 50,000.00 35,000.00
M.256.b Ampelas halus + sedang m1 61,740.00 25,000.00 25,000.00 30,000.00 25,000.00 50,000.00 17,500.00 25,000.00 22,500.00 25,000.00 25,000.00 27,500.00 27,500.00 27,500.00 55,000.00 30,000.00 10,000.00 25,000.00 10,000.00 60,000.00 60,000.00 50,000.00 50,000.00 40,000.00
M.257 Sanding kg 110,250.00
M.258 Dempul (wood filler) kg 52,000.00 34,000.00 37,000.00
M.259 Melamic kg 68,250.00
M.260 Kuas/Kwas bh 28,875.00 16,000.00 15,500.00 5,000.00 22,000.00 20,000.00 12,000.00
M.260.a Kuas 2" - 4" bh 31,500.00 22,000.00 20,000.00 25,000.00 15,000.00 18,000.00 20,000.00 20,500.00 21,000.00 20,000.00 20,000.00 22,500.00 22,500.00 20,000.00 10,000.00 20,000.00 21,500.00 22,000.00 23,000.00 22,000.00 21,500.00 22,500.00 21,500.00 20,000.00 22,500.00 21,000.00 25,000.00 7,000.00 25,000.00 17,000.00 16,000.00 15,000.00 19,000.00 25,000.00 20,000.00 7,500.00 18,000.00 20,000.00 18,000.00 15,000.00 20,000.00 15,000.00 15,000.00 7,000.00 16,000.00
M.261 Aspal kg 15,907.50 5,000.00 10,000.00
M.261.a Aspal Emulsi kg 15,907.50 15,000.00
M.261.b Asbuton Halus Ton 383,250.00
M.261.c Batu Bara Kg 1,260.00
M.261.d Timah kg 680,700.00
M.262 Aspal Cement (Pelabuhan) kg 15,907.50
M.263 Beton 1:2:3 m3 1,223,209.95
M.263.a Patok Beton K-175 buah 108,911.88
M.264 Campuran beton m3 1,223,209.95
M.264.a Beton mutu, f1c=14,5 Mpa (K175) m3 1,160,884.50
M.264.b Campuran beton fc'=19,3 Mpa m3 1,223,209.95
M.264.c Campuran beton, fc'≥ 20 Mpa m3 1,099,199.79
M.264.d Campuran beton ready mix m3 1,223,209.95
M.264.e Beton K-300 m3 1,280,107.83
M.264.f Beton K-125 m3 1,092,123.70
M.264.g Beton K-175 m3 1,160,884.50
M.264.h Beton K-500 m3 1,454,250.00
M.264.i Beton K-400 m3 1,307,250.00
M.264.j Beton K-350 m3 1,367,402.20
Be to n mutu fc'=2 1,7 Mpa (K2 50) slump (12 ± 2) cm, w/c =
M.264.k m3 1,240,682.21
0,5 6
M.264.l Buis Beton U Ø 0.20 m m1 52,065.56
M.264.m Buis Beton U Ø 0.30 m m1 65,968.09
M.264.n Box Culvert monolit 400 x 400 mm m1 1,318,590.00
M.264.o Box Culvert monolit 500 x 500 mm m1 1,648,402.88
M.264.p Box Culvert monolit 600 x 600 mm m1 2,122,643.25
M.264.q Box Culvert monolit 800 x 800 mm m1 3,412,237.50
M.264.r Box Culvert monolit 1000 x 1000 mm m1 4,680,112.50
Bo x U Beton Be rtul ang u kuran da lam 40 x 60 cm, tebal 5 cm
M.264.s m1 822,794.70
(U 4 0/60-12 0)
Tutup Box U Beton Bertul ang uku ran 50 x 60 cm, te bal 1 0 cm
M.264.t m1 455,582.40
(C over 50x6 0x10 Cro ssing )
Tutup Box U Beton Bertul ang uku ran 50 x 60 cm, te bal 8 cm
M.264.u m1 337,537.20
(C over 50x6 0x8)
Bo x U Beton Be rtul ang u kuran da lam 50 x 60 cm, tebal 7 ,5
M.264.v m1 1,003,269.54
cm (U 50/60 - 120 )
Tutup Box U Beton Bertul ang uku ran dal am 65 x 6 0 cm, te bal 1
M.264.w m 777,504.00
12 cm (Co ver 65x60 x12 Crossi ng)
Tutup Box U Beton Bertul ang uku ran dal am 65 x 6 0 cm, te bal
M.264.x m1 512,731.13
10 cm (Co ver 65x60 x10)
Bo x U Beton Be rtul ang u kuran da lam 60 x 60 cm, tebal 7 ,5
M.264.y m1 975,429.00
cm (U 60/60 -120 )
Tutup Box U Beton Bertul ang uku ran 75 x 60 cm, te bal 1 2 cm
M.264.z m1 807,157.26
(C over 75x6 0x12 Cro ssing )
Tutup Box U Beton Bertul ang uku ran 75 x 60 cm, te bal 1 0 cm
M.264.aa m1 596,636.04
(C over 75x6 0x10 )
Bo x U Beton Be rtul ang u kuran da lam 60 x 70 cm, tebal 7 ,5
M.264.ab m1 1,235,516.10
cm (U 60/70 -120 )
Bo x U Beton Be rtul ang u kuran da lam 60 x 80 cm, tebal 7 ,5
M.264.ac m1 1,352,687.70
cm (U 60/80 -120 )
Bo x U Beton Be rtul ang u kuran da lam 80 x 80 cm, tebal 7 ,5
M.264.ad m1 1,567,020.00
cm (U 80/80 -120 )
Bo x U Beton Be rtul ang u kuran da lam 80 x 90 cm, tebal 7 ,5
M.264.ae m1 1,723,779.36
cm (U 80/90 -120 )
Tutup Box U Beton Bertul ang uku ran 95 x 60 cm, te bal 1 5 cm
M.264.af m1 2,471,441.70
(C over 95x6 0x15 Cro ssing )
Tutup Box U Beton Bertul ang uku ran 95 x 60 cm, te bal 1 0 cm
M.264.ag m1 1,597,596.00
(C over 95x6 0x10 )
Bo x U Beton Be rtul ang u kuran da lam 100 x 100 cm, teb al 8,5
M.264.ah m1 2,211,736.80
cm (U 100 /1 00-1 20)
Bo x U Beton Be rtul ang u kuran da lam 100 x 120 cm, teb al 8,5
M.264.ai m1 2,634,581.49
cm (U 100 /1 20-1 20)
Tutup Box U Beton Bertul ang uku ran 117 x 60 cm, teba l 17
M.264.aj m1 3,544,369.92
cm (Co ve r 1 17x6 0x17 Cro ssi ng)
Tutup Box U Beton Bertul ang uku ran 117 x 60 cm, teba l 10
M.264.ak m1 2,260,576.50
cm (Co ve r 1 17x6 0x10)
M.264.al Buis Beton dia 0,3 Bh 86,625.00
M.264.aM. Buis Beton dia 0,4 Bh 111,195.00
M.264.an Buis Beton dia 0,6 Bh 198,030.00
M.265 Kolom beton pracetak btg 0.00
M.266 Panel Beton pracetak lbr 152,250.00
M.267 Cerucuk tiang beton Ø 10 - 15 cm m 21,131.25
M.267.a Cerucuk m 21,131.25
M.268 Floordeck m2 163,800.00
M.269 Floor lantai (beton lantai kerja) m3 0.00
M.270 Floor Harderner kg 46,200.00
REKAP BAHAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 79 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 66 68 69 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 62 71 52 53 54 55 56 57 83 58
Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kedung Kecamatan
Kecamatan Lowokwaru
Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kandang Klojen
Badung Kel.
Pisang Candi Badung Gadang Bndulan Bandulan Kel. Kel. Arjosari Kd. Baleajosari Kel. Kel. Kel. Jodipan Kel.Bumiayu
Mulyorejo Kebonsari Kebonsari Kebonsari Tejosari Tanjung Tejo Tunjungrejo Mulyorejo Kebonsari Tulusrejo Mulyoagung Mulyoagung Dinoyo Tunggulwulung Tlogomas Merjosari Kec. Lowok Kd. Polowijen Kel. Arjosari Kd. Baleajosari Kel. Kesatrian Kel. Bunulrejo Kel. Polehan Kel. Kejalrian Kel. Bunud Purwantoro Kel polowijen Jl. Rais (UD. Kel. Bumiayu (Mitra Mangliawan Pakis Kel. Tlogowaru (Ud. Kel. Arjowinangan Arjowinangun (Akbar Bareng ( Kawi
KODE NAMA BAHAN SATUAN HARGA 2018 Kec.Sukun Tejosari (Rajawali (Makmur Jaya (Sumber Kel. Tlogowaru UD. Ringin Agung Toko Masjhur Purwantoro (Tb. Mangun (Tb Utama Pandanwangi Pandanwangi Kota Lama Kec.Kedung Kandang Toko Cahaya Alam
(Makmur Jaya) (Sader Jaya) (Tunggul Jaya) (Masjhur) Kec.Sukun (Bedak Willys) (Mirah Rejeki) (Berkah Abadi) (Mely Jaya 2) Dinoyo Tasik Madu Tasik Madu Tulusrejo Mojolangu Jatimulyo (Prakasa Jatimulyo Lowokwaru Lowokwaru Merjosari Dinoyo (Sinar Dawuh (Ud. Merjosari (Ud.Atika Merjosari (TB Mandiri (Mat ahari) (Mayang Tunjung Sekar Tunjung Sekar Waru (AJ) (Kendedes) (SumberJaya) (Tb Barokah) (Rezza Jaya) (Sumber Alam) (Horas Jaya) (Moza I I) (Arjosari Jaya) (Manis (molyo) Djawa Baru) Karya) (R.J.A) Bumi Prakasa) (Anugrah) Jaya) Jaya)
(Rizky) (Rizky) Jaya) Abadi) Barokah) (Cahaya Alam) Berjaya) Jaya) (Gio Jaya) (Jati Utomo) (Ud. Koesnadi) (MJ)
(Supralon) (Ahmad Ning) (Bangun Jaya) (Budi Jaya) (Usaha Jaya) (Cahaya Alam) (Mulyo Joyo) Lunas) (Sederhana) (Mawar) (Ud.Cempaka) (Abadi) (Dinoyo Jaya) Sengkaling) Sidomakmur) (Barokah) Jaya) (LAM) Jaya) Grand) (Nona Jaya) (Tb Gemilang) Sentosa)
M.271 Lantai Kerja t= 10 cm m3 4,263,127.25
M.272 Papan Cor m3 598,500.00
M.273 Fondasi pasangan batu m3 0.00
M.274 Centralizer Ls 0.00
M.275 Patok beton Uk.20x20 cm bh 108,911.88
M.276 Tiang panjang beton pracetak lengkap m 0.00
M.277 Volume beton tiang pancang -Uk^2*p m3 0.00
M.277.a Tiang Pancang Pracetak Buah 0.00
M.277.b Tiang Pancang Baja m 768,600.00
M.277.c Tiang Pancang Beton Pratekan m3 0.00
M.277.d Tiang Pancang Baja diameter 30 cm m 1,185,765.00
M.277.e Tiang Pancang Baja kotak 30 x 30 cm m 1,203,300.00
M.277.f Tiang Pancang Beton Bertulang 30 x 30 cm m 321,300.00
M.277.g Tiang Pancang Beton Bertulang 40 x 40 cm m 359,100.00
M.277.h Tiang Lengkung Flandess / baut -6", 5", 3" bh 4,830,000.00
M.277.x Tiang Pancang Kayu bh 0.00
M.278 Borehole Ø 8 3/4" m 1,312,500.00
M.279 Penjaga Jarak Bekisting/spacer bh 1,680.00
M.280 Urugan Pilihan (untuk backfill) m3 265,965.00
M.280.a Urugan Pilihan m3 265,965.00
M.280.b Urugan Pilihan (Sirtu) m3
M.281 Pengencer kg 28,560.00
M.281.a Pengencer ltr 28,560.00
M.282 Curing Compound Ltr 11,025.00
M.283 Joint Sealant kg 181,125.00
M.284 Agregat A m3 181,125.00
M.284.a Agregat Kasar m3 199,461.72
M.284.b Agregat Pengunci m3 232,035.45
M.284.c Agregat Penutup m3 199,461.72
M.284.d Agregat 0-5 m3 206,036.83
M.284.e Agregat 5-10 m3 206,036.83
M.284.f Agregat 10-15 m3 198,146.70
M.284.g Agregat pecah mesin (0-5) m3 206,036.83
M.284.h Agregat pecah mesin (5-9,5) m3 201,653.42
M.284.i Agregat pecah mesin (9,5-19) m3 198,146.70
M.284.j Agregat Halus m3 329,490.00
M.284.k Bahan Agr.Base Kelas A m3 301,245.00
M.284.l Bahan Agr.Base Kelas B m3 301,350.00
M.284.m Bahan Agr.Base Kelas C m3 234,211.66
M.284.n Bahan Agr.Base Kelas C2 m3 0.00
M.284.o Agregat Pecah Mesin 5 - 10 & 10 - 20 mm m3 200,848.16
M.284.p Agregat Pecah Mesin 20 - 30 mm m3 292,897.43
M.284.q Agregat Lolos Screen 1 ukuran (0-5)
M.285 Pen kuningan untuk titik acu pengukuran bh 26,250.00
M.286 Pasangan bata m3 183,593.11
M.286.a Pasangan bata, mortar tipe N m3 0.00
M.286.b Pasangan bata merah 1 Pc : 4 Ps m3 0.00
3
M.287 Pasangan batu uk.20/50, t = 40 cm m 0.00
M.288 Pengelasan cm 7,350.00
M.289 Las Dop bh 11,550.00
M.290 Material las sambungan 0.00
M.291 Aksesoris (Perkuatan, Las dll) Ls 0.00
M.292 Material Pilihan m3 71,400.00
M.292.a Material Pilihan m3 71,400.00
M.293 Bahan tambahan kimia ltr 21,000.00
M.293.a Additive ltr 40,425.00
M.293.b Superplastisizer kg 31,500.00
M.293.c Bahan pengawet (kreosot) ltr 5,250.00
M.293.d Bahan Modifikasi Kg 5,250.00
M.294 Bahan pengaman tebing galian m3 0.00
M.294.a Bahan pengaman tebing galian Ls 1,368,675.00
M.294.b Bahan pengaman tebing galian (Kayu) m3
M.295 Perkuatan jalan yang di lalui Ls 0.00
M.296 Perkuatan jembatan yang di lalui Ls 0.00
M.297 Peralatan K3 ** Ls 0.00
M.298 Bengkel m2 26,250.00
M.299 Gudang, dan lain-lain m2 26,250.00
M.300 Barak m2 47,250.00
M.301 Base camp m2 52,500.00
M.302 Kantor m2 78,750.00
M.303 Ruang Laboratorium m2 57,750.00
M.304 Poliklinik m2 0.00
M.305 Biaya poliklinik Ls 0.00
M.306 Biaya transportasi peralatan Ls 0.00
M.307 Biaya pengaturan lalu lintas Ls 0.00
M.308 Kabel m 11,550.00
M.308.a Kabel prestres kg 52,605.00
M.308.b Kabel prestres m 0.00
M.308.c Ducting (Strand prestress) m3 63,000.00
M.308.d Kabel isolasi, air accu, besi trip, asetelin H2O dan lain-lain Ls 26,250.00
M.308.e Kabel NYA 2.5 mm m1 20,534.50 14,600.00 67,500.00 300,000.00 23,700.00 25,500.00 25,000.00 23,700.00 23,500.00 10,000.00 10,200.00 35,000.00 50,000.00 11,000.00 150,000.00 9,000.00 10,500.00
M.308.f Kabel NYA 4.0 mm m1 26,250.00 13,000.00 4,000.00 6,000.00 6,000.00 10,000.00
M.308.g Kabel NYYHY 3 x 6 mm m1 69,300.00 4,000.00 13,000.00
M.308.h Kabel NYYHY 3 x 4 mm m1 21,735.00 18,000.00
M.308.i Kabel NYYHY 3 x 1.5 mm m1 13,125.00 780,000.00 10,000.00 16,000.00
M.308.j Kabel NYA 2x2.5 mm m1 14,700.00 860,000.00 12,000.00
M.308.k Kabel Prategang kg 9,500.00
M.308.l Kabel Prategang Selongsong m1
M.308.m Kabel Prategang Grouting m2
M.309 MCB bh 73,500.00 55,000.00 59,000.00 50,000.00 67,000.00 70,000.00 69,500.00 58,000.00 73,000.00
M.310 Saklar bh 55,125.00 15,000.00 20,000.00 16,000.00 16,000.00 15,000.00 16,500.00 18,000.00 16,000.00 15,000.00 16,000.00 15,500.00 15,000.00 15,500.00 14,000.00 17,000.00 16,000.00 17,000.00 16,500.00 15,000.00 16,000.00 13,000.00 21,000.00 19,000.00 19,500.00 20,500.00 21,500.00 20,000.00 26,000.00 20,000.00 45,000.00 16,000.00 12,000.00 3,500.00 15,000.00 20,000.00 17,000.00 19,000.00 20,000.00 15,000.00
M.310.a Stop kontak bh 44,520.00 17,000.00 35,000.00 16,000.00 17,000.00 15,000.00 17,500.00 15,000.00 16,500.00 16,500.00 16,500.00 16,500.00 17,000.00 16,000.00 17,000.00 17,000.00 18,000.00 17,500.00 17,500.00 17,500.00 16,000.00 17,000.00 18,500.00 18,500.00 18,000.00 17,500.00 16,000.00 17,500.00 17,000.00 17,000.00 20,000.00 15,000.00 10,000.00 7,000.00 15,000.00 15,000.00 15,000.00 16,000.00 17,000.00 13,000.00 10,000.00 16,000.00 26,500.00 17,500.00 13,000.00 13,000.00 17,000.00 12,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00
M.310.b Saklar Broco Tunggal bh 52,290.00 15,000.00 17,000.00 18,000.00 15,000.00 14,500.00 17,500.00 13,500.00 14,500.00 14,000.00 14,500.00 15,000.00 15,000.00 18,000.00 19,000.00 15,500.00 15,500.00 16,000.00 15,000.00 15,500.00 16,000.00 20,000.00 15,000.00 18,000.00 13,500.00 15,000.00 15,000.00 16,000.00 8,000.00 10,000.00 16,000.00 16,500.00 17,500.00 15,000.00 12,000.00 12,000.00 17,000.00 20,000.00 15,000.00 15,000.00 12,000.00 14,000.00 15,000.00
M.310.c Saklar Broco Ganda bh 57,645.00 17,000.00 22,000.00 25,000.00 16,000.00 16,500.00 17,000.00 18,000.00 17,000.00 17,000.00 17,000.00 17,500.00 17,000.00 22,000.00 22,500.00 16,000.00 18,500.00 17,500.00 17,000.00 18,000.00 20,000.00 18,500.00 18,000.00 20,000.00 13,000.00 19,000.00 20,000.00 18,000.00 20,000.00 17,000.00 15,000.00 18,000.00 23,000.00 15,000.00 20,000.00 15,000.00 22,000.00 20,000.00 17,500.00 16,000.00 15,000.00 17,000.00 18,000.00
M.310.d Lampu Pijar 5 - 40 Watt bh 29,085.00 9,000.00 55,000.00 39,000.00 5,500.00 10,000.00 8,000.00 17,500.00 42,110.00
M.310.e Lampu Pijar 50 - 100 Watt bh 48,100.00 39,000.00 5,500.00 35,000.00 27,000.00 5,000.00
M.310.f Lampu TL Komplit 20 Watt bh 100,400.00 39,000.00 48,000.00 90,000.00 65,000.00 15,000.00
M.310.g Lampu LED Komplit 40 Watt bh 202,965.00 28,000.00 29,000.00 29,000.00 29,000.00 30,000.00 29,000.00 28,000.00 30,000.00 30,000.00 29,500.00 27,000.00 30,000.00 39,000.00 48,000.00
M.310.h Lampu XL (Lilin) 5 Watt bh 48,600.00 33,000.00 35,000.00 35,000.00 32,000.00 32,500.00 32,500.00 33,000.00 33,000.00 31,500.00 32,500.00 34,000.00 33,500.00 30,000.00 39,000.00 20,000.00 27,500.00 25,000.00
M.310.i Lampu LED 8 Watt bh 49,400.00 32,000.00 39,000.00 30,000.00 25,000.00
M.310.j Lampu LED 14 Watt bh 55,800.00 40,000.00 36,000.00 25,000.00
M.310.k Lampu LED 18 Watt bh 157,500.00 39,000.00 50,000.00 37,500.00 25,000.00 25,000.00
M.310.l Lampu LED 23 Watt bh 69,900.00 45,000.00
M.310.m Zekering Kast Lokal 1 Group Unit 105,210.00 6,000.00 65,000.00 16,500.00 50,000.00 15,000.00 30,000.00 26,000.00 15,000.00 16,000.00
M.310.n Zekering Kast Lokal 2 Group Unit 154,245.00 25,000.00 25,000.00 15,000.00 3,500.00 25,000.00 25,000.00 21,500.00 17,500.00 15,000.00
M.310.o Zekering Kast Lokal 3 Group Unit 210,525.00 25,000.00 75,000.00
M.311 T Dus bh 2,500.00 2,000.00 2,000.00 1,000.00 1,500.00 3,000.00 1,500.00 2,000.00 2,500.00 2,000.00 2,000.00 1,000.00 2,500.00 3,000.00 1,000.00
M.312 Klem bh 882.00 180.00 1,500.00 300.00 2,000.00
M.312.a Klem Biasa bh 437.50 500.00 2,000.00 500.00 600.00 150.00
M.313 Pemantul Cahaya (Reflector) bh 26,250.00
M.313.a Benang geotekstil (pengikat) m 11,025.00
M.313.b Tali rapia/plastik m1 17,325.00 5,000.00 3,500.00 4,500.00 5,000.00 3,000.00 6,500.00 20,000.00 4,500.00
M.314 Ijuk m3 242,865.00
M.314.a Ijuk kg 66,150.00
M.314.b Tambang ijuk m 21,000.00
M.315 Alang-Alang ikat 7,700.00
M.316 Bibit mangrove pohon 0.00
M.317 Gebalan rumput m2 25,410.00
M.318 Cuka bibit ltr 0.00
M.318.a Cuka bibit m2 17,325.00
2
M.319 Expansion Cap m 40,215.00
M.320 Pelat Rambu (Eng. Grade) bh 284,865.00
M.320.a Pelat Rambu (High I. Grade) bh 350,595.00
M.320.b Rel Pengaman m 583,275.00
M.321 Plastic Aerator bh 10,237.50
M.321.a Plastik 10,237.50
M.321.b Kantong plastik (tebal) Paket 26,250.00
M.322 Plastik Filter m2 26,250.00
M.322.a Karung bagor bh 9,240.00
M.322.b Karung goni bh 5,250.00 3,000.00
M.322.c Karung goni m2 16,695.00
M.322.d Karung plastik bh 8,347.50
M.323 Banner plastik ukuran 0,6 x 0,8 m2 m2 0.00
M.324 Karpet m2 157,290.00
M.325 Perlengkapan Ls 0.00
M.325.a Perlengkapan % 0.00
M.326 Formika lbr 265,125.00
M.326.a Formika (90 x 120) cm lbr 265,125.00
M.327 Kalkarium kg 12,915.00
M.328 Mongkok bh 36,750.00
M.329 Ramset bh 1,837.50
M.330 Strorox - 100 kg 175,035.00
M.331 Soda api kg 37,100.00 22,500.00
M.332 Underlayer m2 0.00
M.333 Vernis ltr 93,100.00 28,000.00 29,000.00 28,500.00 26,500.00 28,500.00 28,000.00 29,000.00 26,500.00 29,000.00 28,500.00 26,500.00 28,500.00 27,000.00
M.334 Vynil Bh 106,444.80
M.335 Polietilin 125 mikron kg 0.00
M.336 Sabun kg 65,500.00
M.337 Glass Bead kg 93,450.00
M.338 Gravel m3 303,164.81
M.339 Anti Stripping Agent kg 0.00
M.340 Ajir tinggi 2 , bh 0.00
M.341 Mistar ukur besi / allumunium m3 105,000.00
M.342 Kotak 10 cm kg 0.00
M.343 Kotak sampel pkt 52,500.00
M.344 Screening kg 0.00
M.345 Lc screen 6" m 226,373.70
M.345.a Lc screen 8" m 301,168.35
M.346 Phenol film 12 mm lbr 257,250.00
M.347 Film selulosa isi 36 roll 0.00
M.348 Cuci film roll 0.00
M.349 CD copy soft file foto image bh 0.00
M.350 Foto album bh 0.00
M.351 Foto printing lbr 0.00
M.352 Pena rapido bh 0.00
M.353 Tinta rapido bh 0.00
M.354 Tinta printer / plotter set 0.00
M.355 Kertas HVS atau kalkir lbr 0.00
M.355.a Kertas HVS atau kalkir (A1) lbr 262,500.00
M.356 Elastomer jenis 1 buah 535,500.00
M.356.a Elastomer jenis 2 buah 630,000.00
M.356.b Elastomer jenis 3 buah 735,000.00
M.357 Expansion Tipe Joint Asphaltic Plug M 1,645,875.00
M.357.a Expansion Join Tipe Rubber M 1,871,100.00
M.357.b Expansion Join Baja Siku M 444,675.00
M.358 Kerb Type A Buah 69,300.00
M.358.a Kerb Type B Buah 73,300.00
M.358.b Kerb Type C Buah 74,300.00
M.359 Expansion Joint Tipe Torma M1 1,836,450.00
M.360 Strip Bearing Buah 381,150.00
M.361 Joint Socket Pile 35x35 Set 928,620.00
M.361.a Joint Socket Pile 16x16x16 Set 103,950.00
M.361.b Mikro Pile 16x16x16 M1 71,400.00
M.362 Matras Concrete Buah 635,250.00
M.363 Assetilline Botol 360,360.00
M.364 Oxygen Botol 184,800.00
M.365 Formtie bh 14,910.00
M.366 Elektroda kg 55,125.00
M.367 Angker Bar kg 26,565.00
M.367.a Angker Bar F 22 mm Kg 26,565.00
M.368 Pagar Model BRC tinggi 1 m m2 630,000.00
M.369 Roda Railling kg 25,777.50
M.370 Tutup Avoor dari Cor Besi Tuang, 60x80 cm (Ex. Ceper) Unit 2,625,000.00
M.371 Tutup Bak Kontrol Cor Besi Tuang, 100x100 cm (Ex. Ceper) Unit 3,150,000.00
M.372 Sekrup Segala Ukuran bh 1,050.00
M.372.a Sekrup Segala Ukuran kg
M.374 Isolator m1 1,365.00
M.375 Pembuatan bak sirkulasi Ls 1,228,500.00
M.376 Pembersihan lokasi Ls 341,250.00
M.377 Pengerasan jalan masuk Ls 955,500.00
M.378 Grease kg 56,070.00
M.379 Polytene 125 mikron Kg 20,212.50
M.380 Casing m2 9,450.00
M.381 MCB 1 Phase 6 A bh 53,970.00
M.382 Armature Tipe A-HPS-T250 W (SONT 250 W) Unit 4,226,250.00
M.383 Armature Tipe A-HPS-T250 W (SONT 250 W) Unit 4,226,250.00
M.384 Terminal Block 20 Amp 4 pool bh 37,905.00
M.385 Terminal Block 20 Amp 4 pool bh 37,905.00
M.386 Pompa Air Unit 1,243,305.00 465,000.00 465,000.00 450,000.00 40,000.00 350,000.00 550,000.00 420,000.00 380,000.00 450,000.00 550,000.00
M.386.a Pasang Pompa submersible Q = 3,5 l/det, H = 150 m Unit 69,738,900.00 495,000.00
M.386.b Pasang Pompa submersible Q = 10 l/det, H = 100 m Unit 113,397,900.00
M.387 Tandon Air PVC V = 0.5 m3 bh 1,138,095.00 550,000.00 550,000.00 545,000.00 550,000.00 40,000.00 545,000.00 550,000.00 552,500.00 552,000.00 552,000.00 549,000.00 550,000.00 549,000.00 550,000.00 550,000.00 850.00 750,000.00 1,200,000.00 600,000.00 525,000.00 350,000.00 750,000.00 750,000.00 500,000.00 550,000.00 320,000.00 1,300,000.00 330,000.00 400,000.00 400,000.00 350,000.00
M.387.a Tandon Air PVC V = 1.0 m3 bh 2,013,795.00 775,000.00 775,000.00 775,000.00 1,115,000.00 770,000.00 770,000.00 774,500.00 777,000.00 776,500.00 773,500.00 775,000.00 774,000.00 774,000.00 777,000.00 451,000.00 450,500.00 450,000.00 1,480.00 450,000.00 1,250,000.00 725,000.00 450,000.00 1,200,000.00 1,150,000.00 550,000.00 380,000.00 390,000.00 650,000.00
M.387.b Tandon Air Stainless V = 0.5 m3 bh 3,147,585.00 875,000.00 1,010,000.00 870,000.00 870,000.00 875,000.00 876,000.00 874,500.00 874,000.00 875,000.00 555,000.00 876,000.00 873,500.00 874,000.00 568,000.00 567,500.00 567,000.00 1,975.00 560,000.00 3,500,000.00 600,000.00 650,000.00 420,000.00 600,000.00 750,000.00
M.387.c Tandon Air Stainless V = 1.0 m3 bh 5,270,790.00 766,000.00 766,000.00 765,000.00 3,850.00 760,000.00 6,500,000.00 800,000.00 950,000.00 920,000.00 680,000.00
M.388 Rumput Lamur m2 976,500.00 830,000.00 960,000.00 1,000,000.00
M.388.a Rumput Manila m2 28,875.00
M.388.b Semak Hias m2 19,845.00
M.388.c Pohon Pelindung btg 301,875.00
M.388.d Rumput Common Bermuda Grass m2 22,260.00
M.389 Pupuk kg 4,305.00
M.390 Obat Tanaman Ltr 142,065.00
M.391 Gamping kg 14,700.00 7,000.00 5,500.00 7,000.00 6,000.00 3,500.00 10,000.00 100,000.00 3,500.00 3,500.00 3,000.00
M.392 Mini Timber Buah 31,500.00
M.393 Flange Las Ø 3" bh 82,635.00
M.393.a Flange Las Ø 4" bh 107,835.00
M.393.b Flange Gate Valve Ø 2" bh 929,775.00
M.393.c Flange Gate Valve Ø 3" bh 1,461,075.00
M.393.d Flange Gate Valve Ø 4" bh 1,807,575.00
M.393.e Bend All Flange Ø 2" x 90º bh 2,806,650.00
M.393.f Bend All Flange Ø 2" x 45º bh 263,340.00
M.393.g Bend All Flange Ø 3" x 90º bh 441,210.00
M.393.h Bend All Flange Ø 3" x 45º bh 347,130.00
M.393.i Bend All Flange Ø 4" x 90º bh 506,940.00
REKAP BAHAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 79 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 66 68 69 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 62 71 52 53 54 55 56 57 83 58
Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamat an Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kecamatan Kedung Kecamatan
Kecamatan Lowokwaru
Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Sukun Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Lowokwaru Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Blimbing Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kedungkandang Kandang Klojen
Badung Kel.
Pisang Candi Badung Gadang Bndulan Bandulan Kel. Kel. Arjosari Kd. Baleajosari Kel. Kel. Kel. Jodipan Kel.Bumiayu
Mulyorejo Kebonsari Kebonsari Kebonsari Tejosari Tanjung Tejo Tunjungrejo Mulyorejo Kebonsari Tulusrejo Mulyoagung Mulyoagung Dinoyo Tunggulwulung Tlogomas Merjosari Kec. Lowok Kd. Polowijen Kel. Arjosari Kd. Baleajosari Kel. Kesatrian Kel. Bunulrejo Kel. Polehan Kel. Kejalrian Kel. Bunud Purwantoro Kel polowijen Jl. Rais (UD. Kel. Bumiayu (Mitra Mangliawan Pakis Kel. Tlogowaru (Ud. Kel. Arjowinangan Arjowinangun (Akbar Bareng ( Kawi
KODE NAMA BAHAN SATUAN HARGA 2018 Kec.Sukun Tejosari (Rajawali (Makmur Jaya (Sumber Kel. Tlogowaru UD. Ringin Agung Toko Masjhur Purwantoro (Tb. Mangun (Tb Utama Pandanwangi Pandanwangi Kota Lama Kec.Kedung Kandang Toko Cahaya Alam
(Makmur Jaya) (Sader Jaya) (Tunggul Jaya) (Masjhur) Kec.Sukun (Bedak Willys) (Mirah Rejeki) (Berkah Abadi) (Mely Jaya 2) Dinoyo Tasik Madu Tasik Madu Tulusrejo Mojolangu Jatimulyo (Prakasa Jatimulyo Lowokwaru Lowokwaru Merjosari Dinoyo (Sinar Dawuh (Ud. Merjosari (Ud.Atika Merjosari (TB Mandiri (Mat ahari) (Mayang Tunjung Sekar Tunjung Sekar Waru (AJ) (Kendedes) (SumberJaya) (Tb Barokah) (Rezza Jaya) (Sumber Alam) (Horas Jaya) (Moza I I) (Arjosari Jaya) (Manis (molyo) Djawa Baru) Karya) (R.J.A) Bumi Prakasa) (Anugrah) Jaya) Jaya)
(Rizky) (Rizky) Jaya) Abadi) Barokah) (Cahaya Alam) Berjaya) Jaya) (Gio Jaya) (Jati Utomo) (Ud. Koesnadi) (MJ)
(Supralon) (Ahmad Ning) (Bangun Jaya) (Budi Jaya) (Usaha Jaya) (Cahaya Alam) (Mulyo Joyo) Lunas) (Sederhana) (Mawar) (Ud.Cempaka) (Abadi) (Dinoyo Jaya) Sengkaling) Sidomakmur) (Barokah) Jaya) (LAM) Jaya) Grand) (Nona Jaya) (Tb Gemilang) Sentosa)
M.393.j Bend All Flange Ø 4" x 45º bh 441,420.00
M.393.k Flange Socket Ø 2" bh 202,860.00
M.393.l Flange Socket Ø 3" bh 267,960.00
M.393.m Flange Socket Ø 4" bh 369,915.00
M.393.n Flange Spigot Ø 2" bh 181,440.00
M.393.o Flange Spigot Ø 3" bh 247,380.00
M.393.p Flange Spigot Ø 4" bh 307,860.00
M.393.q Straatport Ø 2" bh 88,620.00
M.393.r Straatport Ø 3" bh 109,095.00
M.393.s Straatport Ø 4" bh 157,710.00
M.393.t Straatport Ø 6" bh 220,080.00
M.393.u Flange Las Ø 2" bh 74,550.00
M.393.v Flange Drat Ø 2" bh 93,030.00
M.393.w Flange Drat Ø 3" bh 103,110.00
M.393.x Flange Drat Ø 4" bh 145,005.00
M.393.y Flange Buta Ø 2" bh 95,025.00
M.393.z Flange Buta Ø 3" bh 154,665.00
M.393.aa Flange Buta Ø 4" bh 188,895.00
M.394 Pengelasan, plat, packing, baut 51,450.00
M.395 Dop PVC Ø 2" bh 22,890.00 6,000.00 6,000.00
M.395.a Dop PVC Ø 3" bh 36,435.00 8,000.00 8,000.00 7,500.00 8,000.00 8,000.00 7,000.00 9,000.00 9,500.00 7,500.00 8,000.00 8,000.00 8,000.00 9,000.00 8,500.00 8,000.00 9,000.00 7,000.00 9,000.00 9,000.00 9,500.00 9,000.00
M.395.b Dop PVC Ø 4" bh 59,535.00 10,000.00 9,000.00 9,500.00 10,000.00 10,000.00 11,500.00 10,500.00 11,000.00 11,000.00 10,000.00 10,000.00 10,500.00 9,500.00 9,000.00 9,500.00 10,500.00 8,000.00 10,000.00 11,000.00 9,000.00 12,000.00
M.396 Reducer PVC Moof 3" x 2" bh 73,920.00 10,000.00 16,000.00
M.396.a Reducer PVC Moof 4" x 3" bh 132,825.00 12,000.00 11,000.00 11,000.00 12,500.00 11,000.00 14,000.00 11,000.00 11,000.00 12,500.00 12,000.00 10,000.00 12,000.00 11,000.00 11,000.00 12,000.00 12,500.00 12,000.00 11,500.00 19,000.00
M.397 Flange Check Valve Ø 2" bh 1,175,160.00
M.397.a Flange Check Valve Ø 3" bh 1,856,295.00
M.398 Flange Air Valve Ø 1" bh 470,085.00
M.398.a Flange Air Valve Ø 2" bh 1,588,755.00
M.399 Flange Water Meter Ø 2" bh 2,142,525.00
M.399.a Flange Water Meter Ø 3" bh 2,458,995.00
M.400 Manometer 10 bar bh 190,575.00
M.401 Water Meter Ø 1/2'' bh 177,870.00
M.402 Clamp Sadle Ø 2" x 1/2" bh 29,505.00 4,000.00
M.403 Kenie Drat GI Ø 1/2" bh 6,615.00 3,500.00 4,000.00 3,500.00 4,000.00 3,500.00 4,500.00 3,500.00 3,500.00 3,500.00 1,500.00 4,000.00 4,000.00 3,000.00 4,500.00 3,500.00 4,500.00 5,500.00 5,000.00 4,500.00 5,500.00 5,000.00 4,500.00 30,000.00
M.403.a Kenie Drat GI Ø 2" bh 41,055.00 4,000.00 6,500.00 3,000.00 3,500.00
M.403.b Kenie Drat GI Ø 3" bh 120,645.00 9,500.00 3,500.00 3,500.00
M.403.c Kenie Drat GI Ø 4" bh 177,345.00 3,500.00
M.404 Tee Drat GI Ø 1/2" bh 8,715.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 3,500.00 4,000.00 5,000.00 5,000.00 5,000.00 4,500.00 5,500.00 4,000.00 6,000.00 5,500.00 5,500.00 5,500.00 4,000.00 5,000.00 5,000.00 5,000.00
M.405 Double Neple Ø 1/2" bh 6,405.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 5,000.00 4,500.00 5,500.00 4,000.00 3,000.00 4,000.00 4,000.00 3,000.00 4,000.00 3,500.00 6,000.00 5,000.00 3,000.00 4,000.00 1,500.00
M.405.a Double Neple Ø 2" bh 52,605.00 4,500.00 3,000.00
M.405.b Double Neple Ø 3" bh 138,600.00
M.405.c Double Neple Ø 4" bh 178,395.00
M.406 Sock Drat GI Ø 2" bh 29,190.00 3,500.00 5,000.00 7,000.00
M.406.a Sock Drat GI Ø 3" bh 76,440.00 5,000.00 5,000.00 10,000.00
M.406.b Sock Drat GI Ø 4" bh 120,120.00 13,000.00
M.407 Elbow Drat GI Ø 2" bh 53,340.00
M.407.a Elbow Drat GI Ø 3" bh 138,390.00
M.407.b Elbow Drat GI Ø 4" bh 178,395.00
M.408 Giboult Joint Ø 2" bh 155,190.00
M.408.a Giboult Joint Ø 3" bh 199,710.00
M.408.b Giboult Joint Ø 4" bh 350,595.00
M.409 Panel Pompa bh 11,550,000.00
M.410 Juction Box bh 433,125.00
M.411 Elektroda Pompa bh 63,525.00
M.412 Pelengkapan - -
M.413 Drilling Fluid (Mud) m3 420,000.00
M.414 Mata Bor (Bit) Ø 8" 3/4" Unit 12,600,000.00 35,000.00 12,000.00
M.414.a Mata Bor (Bit) Ø 12" unit 15,750,000.00 37,000.00
M.415 Tanah humus setebal 20 cm m3 21,000.00
M.416 Pupuk kg 5,250.00
M.417 Pohon bh 262,500.00
M.418 Ulir Kasar diameter 16 mm kg 22,680.00
M.418.a Ulir Halus diameter 20 mm kg 22,680.00
M.419 Stang Ulir Diameter 16 mm + Gear bh 267,750.00
M.419.a Stang Ulir Diameter 20 mm + Gear set 577,500.00
M.420 Jet Shower TOTO Unit 970,000.00
M.421 Avor Stainless Stell Unit 630,000.00
M.429 Motor 4 kW 1350 rpm + Kabel set 4,777,500.00
M.503 Slimar Alumunium sekelas INDAL m1 140,000.00
M.546.a Besi Polos 10 Kg/unit 8,100.00 68000 68,000.00 70,000.00
M.541 Besi Polos 12 Kg/unit 8,100.00 87000 98,000.00 125,000.00
M.542 Besi Ulir 13 Kg 9,100.00
M.543 Besi Ulir 16 Kg 9,600.00
M.550 Cat Tembok Interior Jotun Kg 136,000.00
M.552 Rel Jendela Set 190,000.00
M.658 Hollow 5/5 M' 34,000.00
M.662 Engsel Pivot Set 130,000.00
M.667 Baja L 80.80.6 Kg 8,400.00
M.683 Cat Duco kg 84,000.00
M.708 Kusen Alumunium M' 150,000.00
M.710 HPL ex Gramino M2 128,275.86
M.725 Roof Mast Galvanis (1,8 mx30m) M2 394,000.00
M.746 Floor Hinge Sekualitas Dekksen, Solid, SES set 860,000.00
M.748 sanblas M2 31,000.00
M.756 Soundproff Panel 60.120 cm M2 945,000.00
M.763 Terakota/clinker M2 145,000.00
M.765 Granit tile 100x100 cm M2 780,000.00
M.768 Rockwoll 3cm M2 24,500.00
M.769 Casement Set 108,000.00
M.771 Pipa Hitam SCH 40, 6" Kg 332,000.00
M.772 Pipa Hitam SCH 40, 3" Kg 9,000.00
M.774 GRC (bertulang/membran) M2 9,500.00
M.775 Kaca Grafir 5mm M2 1,500,000.00
M.776 Pipa Hitam SCH 40, 2,5" Kg 491,910.00
M.777 Pipa Hitam SCH 40, 1,5" kg 231,850.00
M.778 Pipa Hitam SCH 40, 1" Kg 142,500.00
M.779 Pipa Hitam SCH 40, 1,25" Kg 192,230.00
M.780 Atap Spandek t=0,4mm M2 90,000.00
M.781 Rel Pintu/Partisi Atas M' 341,000.00
M.782 Rel Pintu/Partisi Bawah M' 225,000.00
M.784 Besi Nako/ Virkan dia mm, 12 mm m' 12,500.00
M.785 Hollow 30 x 60 x 1,7 mm m' 225,000.00
M.786 Tiang Pancang 25 x 25 K500 m' 185,000.00
M.787 Plat Aluminium 1,2 x 2,4 x 0,9 mm Lbr 265,000.00
M.788 MU-200 Acian Plester Beton kg
M.789 GRC Krawangan m2 500,000.00
M.791 Kusen 3" INDAL m1 140,000.00
a Alat Penyuntik Anti Gravitasi Buah 30,000.00
b Anti Korosif Baja Kg 37,000.00
c Fiber E Glass m 21,500.00
d Petrolium Jelly gr 33,000.00
e Bahan Anti Rayap unit 110,000.00
To.18 Roll Meter bh 72,000.00
B.22 Bekisting m2 21,875.00
NA.106.a Pipa HDPE Ø 63 mm bh 54,000.00
NA.106.b Pipa HDPE Ø 100 mm bh 360,000.00
NA.106.c Pipa HDPE Ø 125 mm bh 687,900.00
NA.106.d Pipa HDPE Ø 150 mm bh 1,129,500.00
NA.106.e Pipa HDPE Ø 200 mm bh 1,754,100.00
NA.106.f Pipa HDPE Ø 250 mm bh 2,737,800.00
NA.106.g Pipa HDPE Ø 300 mm bh 4,348,800.00
NA.106.h Pipa HDPE Ø 400 mm bh 6,960,300.00
NA.106.i Pipa HDPE Ø 450 mm bh 8,801,100.00
NA.106.j Pipa HDPE Ø 500 mm bh 10,856,100.00
NA.106.k Pipa HDPE Ø 800 mm bh 51,313,800.00
NA.106.l Pipa HDPE Ø 900 mm bh 65,131,200.00
NA.106.m Pipa HDPE Ø 1000 mm bh 80,226,000.00
NA.106.n Pipa HDPE Ø 1100 mm bh 95,516,400.00
NA.106.o Pipa HDPE Ø 1200 mm bh 110,806,800.00
NA.106.p Pipa HDPE Ø 600 mm bh 26,661,900.00
NA.106.q Pipa HDPE Ø 63 mm m 54,000.00
NA.106.r Pipa HDPE Ø 100 mm m 90,750.00
NA.106.s Pipa HDPE Ø 125 mm m 114,650.00
NA.106.t Pipa HDPE Ø 150 mm m 236,700.00
NA.106.u Pipa HDPE Ø 200 mm m 367,750.00
NA.106.v Pipa HDPE Ø 250 mm m 456,300.00
NA.106.w Pipa HDPE Ø 300 mm m 724,800.00
NA.106.x Pipa HDPE Ø 400 mm m 1,160,050.00
NA.106.y Pipa HDPE Ø 450 mm m 1,466,850.00
NA.106.z Pipa HDPE Ø 500 mm m 1,809,350.00
NA.106.aa Pipa HDPE Ø 600 mm m 4,443,650.00
NA.106.ab Pipa HDPE Ø 800 mm m 8,552,300.00
NA.106.ac Pipa HDPE Ø 900 mm m 10,855,200.00
NA.106.ad Pipa HDPE Ø 1000 mm m 13,371,000.00
NA.106.ae Pipa HDPE Ø 1100 mm m 15,919,400.00
NA.106.af Pipa HDPE Ø 1200 mm m 18,467,800.00
UTAMA
59 60 61 63 64 65 67 72 73 74 75 76 77 78 80 81 82 OLAHAN DATA
Kel. Oro-Oro
Kel. Gading Asri
Oro-oro Dowo UD. Bandung Dowo Kel. Oro-Oro Samaan Sikoharjo Toko Kelayatan (UD. Toko Besi dan UD. Barokah Lintas Alam Toko Restu Kedung [B] : HA RGA DA SAR
Toko Fauida (New Tunggal UD. Sentosa Listrik UD. Kuat Jaya UD Horas Jaya Dinoyo 1 Lowokwaru Blimbing Klojen Sukun Dinoyo [A] : RATA-RATA HARGA SURVEY % SELISIH HARGA 2018 PERHI TUNGAN 2019
(Lestari Jawa) Cipta Abadi (Langgeng Dowo (Bedak) (Rakha) Subur KKA Jaya) Kramik Lie Jaya Mahameru Jaya Kandang
Jaya)
Jaya)
130,000.00 137500 0.0 0 0 130000 0 127,500.00 87.57 145,600.00
300,000.00 290,000.00 300,000.00 186000 0.0 300000 325000 295000 0 290,500.00 153.70 290,500.00
150,000.00 150,000.00 0 0.0 0 0 150000 0 150,000.00 47.62 315,000.00
0 0.0 0 0 0 0 0.00 0.00 121,500.00
300,000.00 250,000.00 225,000.00 350,000.00 280,000.00 350,000.00 230,000.00 295340.909090909 266538.5 283571.428571429 245833.333333333 0 256666.666666667 268,428.57 92.98 288,689.75
214.29 178.57 160.71 250.00 200.00 250.00 164.29 213.267857142857 190.4 202.551020408163 175.595238095238 0 183.333333333333 192.03 93.13 206.21
150,000.00 130,000.00 125,000.00 130,000.00 150,000.00 90,000.00 150,000.00 150,000.00 150,000.00 190225 152857.1 129166.666666667 130769.230769231 150000 140000 147,166.67 53.10 277,136.43
107.14 92.86 89.29 92.86 107.14 64.29 135.131578947368 109.2 92.2619047619048 93.452380952381 0 102.857142857143 103.86 52.46 197.96
280,000.00 290,000.00 283000 0.0 280000 290000 290000 230000 257,500.00 90.73 283,815.00
0 0.0 0 0 0 0 0.00 0.00 16,100.00
250000 0.0 0 170000 0 0 0.00 0.00 192,886.61
0 0.0 0 0 0 0 0.00 0.00 107,625.00
0 0.0 0 0 0 0 0.00 0.00 133,350.00
0 0.0 0 0 0 0 0.00 0.00 150,150.00
0 0.0 0 0 0 0 0.00 0.00 150,150.00
0 0.0 0 0 0 0 0.00 0.00 85,400.00
0 0.0 0 0 0 0 0.00 0.00 55,335.00
0 0.0 0 0 0 0 0.00 0.00 89,670.00
0 0.0 0 0 0 0 0.00 0.00 128,730.00
0 0.0 0 0 0 0 0.00 0.00 112,875.00
0 0.0 0 0 0 0 0.00 0.00 56,700.00
400.00 3,500.00 3,500.00 3,500.00 11666.6666666667 3000.0 400 0 3500 0 8,983.33 0.42 2,118,375.00
366500 0.0 0 0 0 0 0.00 0.00 541,170.00
3250 0.0 0 0 0 0 3,500.00 26.52 13,200.00
250000 0.0 0 125000 0 0 250,000.00 109.51 250,000.00
0 0.0 0 0 0 0 0.00 0.00 303,975.00
0 0.0 0 0 0 0 0.00 0.00 303,975.00
0 0.0 0 0 0 0 0.00 0.00 303,975.00
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
0 0.0 0 0 0 0 0.00 0.00 228,281.85
1,700,000.00 327500 0.0 0 340000 1700000 0 1,015,000.00 458.03 1,015,000.00
220000 0.0 0 340000 0 280000 197,500.00 90.97 217,100.00
65000 0.0 0 0 0 0 65,000.00 55.89 116,300.00
120000 0.0 0 0 0 0 120,000.00 430.11 120,000.00
0 0.0 0 0 0 0 0.00 0.00 62,580.00
0 0.0 0 0 0 0 0.00 0.00 1,995.00
0 0.0 0 0 0 0 0.00 0.00 126,000.00
0 0.0 0 0 0 0 0.00 0.00 10,100.00
0 0.0 0 0 0 0 0.00 0.00 57,750.00
180000 0.0 0 0 0 0 180,000.00 68.71 261,975.00
250000 0.0 0 0 0 0 0.00 0.00 303,975.00
325,000.00 257250 0.0 325000 0 0 0 287,500.00 95.37 301,455.00
300,000.00 3,000.00 250083.333333333 0.0 0 0 151500 0 151,500.00 43.65 347,051.25
236000 0.0 0 0 0 0 0.00 0.00 298,725.00
260000 0.0 0 0 0 0 0.00 0.00 128,100.00
0 0.0 0 0 0 0 0.00 0.00 15,288.00
0 0.0 0 0 0 0 0.00 0.00 150.97
225000 0.0 0 0 0 0 0.00 0.00 275,625.00
0 0.0 0 0 0 0 0.00 0.00 271,740.00
0 0.0 0 0 0 0 0.00 0.00 247,590.00
325,000.00 250,000.00 200,000.00 400,000.00 245,000.00 273166.666666667 260000.0 293750 242727.272727273 245000 253333.333333333 264,705.88 81.19 326,025.00
350,000.00 240,000.00 300,000.00 220,000.00 220,000.00 406666.666666667 263750.0 266000 250000 0 240000 264,117.65 93.98 281,029.41
550.00 1,660.00 525.00 550.00 610.00 570.00 450.00 550,000.00 510.00 530.00 510.00 52891.2380952381 563.0 69364.375 43835 516.666666666667 508.571428571429 32,896.18 2,088.65 32,896.18
366866.666666667 550000.0 0 520000 0 0 565,000.00 100.58 565,000.00
0 0.0 0 0 0 3500 3,500.00 16.28 21,500.00
2,050,000.00 2,050,000.00 2801666.66666667 0.0 2050000 2665000 0 0 2,050,000.00 73.97 2,771,370.00
8,000.00 10,000.00 12,000.00 15000 8785.7 10000 17666.6666666667 0 5000 8,458.33 38.15 22,170.96
18,000.00 0 7000.0 18000 0 0 0 12,500.00 2.47 505,470.00
20,000.00 0 9000.0 20000 0 0 0 14,500.00 95.24 15,225.00
700,000.00 680,000.00 700,000.00 734000 690000.0 0 700000 693333.333333333 680000 693,000.00 71.74 966,000.00
700.00 700,000.00 700,000.00 700,000.00 243092.37 8634.5 700 379216.865 700000 8142.5702811245 239,697.27 2,034.08 239,697.27
0 750000.0 0 0 0 0 750,000.00 95.24 787,500.00
68,500.00 50,000.00 50,000.00 47,000.00 59142.8571428571 52500.0 53875 0 0 50000 52,541.67 68.43 76,781.25
50,000.00 50,000.00 65000 57142.9 50000 42000 0 53750 56,071.43 70.26 79,800.00
68,000.00 70,000.00 2220 2733.3 0 0 69000 0 29,240.00 843.87 29,240.00
2200 2650.0 0 0 0 0 2,650.00 74.23 3,570.00
65,000.00 2000 58750.0 65000 0 0 60000 60,000.00 76.19 78,750.00
60000 63000.0 0 0 0 50000 58,125.00 69.20 84,000.00
0 650000.0 0 0 0 0 650,000.00 95.24 682,500.00
0 0.0 0 0 0 0 0.00 0.00 3,150.00
0 0.0 0 0 0 0 0.00 0.00 3,360.00
0 0.0 0 0 0 0 0.00 0.00 67,300.00
0 0.0 0 0 0 0 0.00 0.00 73,200.00
0 0.0 0 0 0 0 0.00 0.00 78,500.00
0 0.0 0 0 0 0 0.00 0.00 78,500.00
250000 0.0 0 0 0 0 250,000.00 77.61 322,140.00
0 0.0 0 0 0 0 0.00 0.00 210.00
1,137.50 1,150.00 1,150.00 1,200.00 1,150.00 1,175.00 51,500.00 52,000.00 3336.97916666667 660.2 1158.92857142857 4160.83333333333 51750 8264.28571428571 6,868.38 436.09 6,868.38
15500 0.0 0 0 0 0 16,000.00 68.97 23,200.00
1500 0.0 0 0 0 11000 6,250.00 5,952.38 6,250.00
42,500.00 46,000.00 43,000.00 44,000.00 50,000.00 52,000.00 42900 45136.4 46250 42375 0 41875 44,833.33 193.25 44,833.33
43,000.00 75000 43125.0 43000 0 0 40000 46,312.50 16.46 281,400.00
0 0.0 0 0 0 0 0.00 0.00 9,400.00
0 0.0 0 0 0 0 0.00 0.00 103,000.00
11000 0.0 0 0 0 0 11,000.00 100.00 11,000.00
0 0.0 0 0 0 0 0.00 0.00 18,375.00
75,000.00 75,000.00 75000 0.0 0 0 75000 0 75,000.00 69.01 108,675.00
35,000.00 398,000.00 0 0.0 216500 0 0 0 216,500.00 3,549.18 216,500.00
45,000.00 0 0.0 45000 0 0 0 45,000.00 599.40 45,000.00
0 0.0 0 0 0 0 0.00 0.00 8,489.25
21000 0.0 0 0 0 0 0.00 0.00 63,000.00
0 0.0 0 0 0 0 0.00 0.00 8,489.25
0 0.0 0 0 0 0 0.00 0.00 7,400.00
0 0.0 0 0 0 0 0.00 0.00 6,468.00
96000 0.0 0 0 0 0 96,000.00 219.25 96,000.00
115,000.00 0 21105.0 115000 0 0 0 44,578.78 150.95 44,578.78
36.000 / lonjor 46333.3333333333 45333.3 0 44000 0 42860 44,450.00 94.87 46,852.83
0.00 8421.21212121212 9008.3 0 3207.39866194412 0 17291.0927456382 11,036.27 67.38 16,380.00
8,000.00 0.00 6,472.80 7,973.73 9,380.86 86,000.00 89,000.00 95,000.00 95,000.00 100,000.00 14865.7541645347 5739.2 25853.4240150094 5547.61904761905 96666.6666666667 8186.11111111111 23,793.47 260.46 23,793.47
29,000.00 28,000.00 139500 0.0 0 0 28500 0 28,500.00 91.64 31,100.00
16,689.19 104,000.00 114,000.00 156,000.00 156,000.00 62310.8098918919 16216.2 78229.7297297297 0 156000 15225.2252252252 75,325.55 308.89 75,325.55
6480 0.0 0 6068.75 0 13000 13,000.00 71.98 18,060.00
0 0.0 0 0 0 140000 140,000.00 95.24 147,000.00
0 0.0 0 0 0 180000 180,000.00 95.24 189,000.00
40000 0.0 0 0 0 0 40,000.00 266.98 40,000.00
0 0.0 0 0 0 0 0.00 0.00 14,982.45
0 0.0 0 0 0 0 0.00 0.00 14,982.45
0 0.0 0 0 0 0 0.00 0.00 43,785.00
0.00 4,411.76 75,000.00 8737.37373737374 2571.2 19852.9411764706 9361.3271754983 0 2295.68411386593 7,567.44 25.63 29,531.25
0.00 125,000.00 11943.5261707989 0.0 41666.6666666667 18833.2771124979 0 5968.77869605142 6,700.53 22.69 29,531.25
0 0.0 0 0 0 0 0.00 0.00 29,531.25
0 0.0 0 0 0 0 0.00 0.00 29,531.25
48,000.00 0 0.0 48000 0 0 0 48,000.00 162.54 48,000.00
0 0.0 0 0 0 0 0.00 0.00 27,400.00
300,000.00 0 0.0 300000 0 0 0 300,000.00 64.45 465,465.00
356,000.00 0 0.0 356000 0 0 0 356,000.00 61.65 577,500.00
0 0.0 0 0 0 0 0.00 0.00 29,531.25
0 0.0 0 0 0 0 0.00 0.00 1,965,600.00
0 0.0 0 0 0 0 0.00 0.00 66,937.50
0 0.0 0 0 0 0 0.00 0.00 29,531.25
0 0.0 0 0 0 0 0.00 0.00 16,380.00
0 0.0 0 0 0 0 0.00 0.00 16,380.00
0 0.0 0 0 0 0 0.00 0.00 16,380.00
0 0.0 0 0 0 0 0.00 0.00 16,380.00
0 0.0 0 0 0 0 0.00 0.00 24,386.25
0 0.0 0 0 0 0 0.00 0.00 19,530.00
0 0.0 0 0 0 0 0.00 0.00 24,386.25
0 0.0 0 0 0 0 0.00 0.00 27,536.25
0 0.0 0 0 0 0 0.00 0.00 74,182.50
0 0.0 0 0 0 0 0.00 0.00 29,531.25
0 0.0 0 0 0 0 0.00 0.00 682,500.00
0 0.0 0 0 0 0 0.00 0.00 262,500.00
0 0.0 0 0 0 0 0.00 0.00 341,250.00
0 0.0 0 0 0 0 0.00 0.00 29,531.25
0 0.0 0 0 0 0 0.00 0.00 29,531.25
0 0.0 0 0 0 0 0.00 0.00 29,531.25
0 0.0 0 0 0 0 0.00 0.00 17,230.50
0 0.0 0 0 0 0 0.00 0.00 17,230.50
0 0.0 0 0 0 0 0.00 0.00 24,386.25
0 0.0 0 0 0 0 0.00 0.00 66,500.00
0 0.0 0 0 0 0 0.00 0.00 127,050,000.00
0 0.0 0 0 0 0 0.00 0.00 138,600,000.00
0 0.0 0 0 0 0 0.00 0.00 173,250,000.00
0 0.0 0 0 0 0 0.00 0.00 218,295,000.00
0 0.0 0 0 0 0 0.00 0.00 233,541,000.00
0 0.0 0 0 0 0 0.00 0.00 268,800,000.00
0 0.0 0 0 0 0 0.00 0.00 5,011,125.00
0 0.0 0 0 0 0 0.00 0.00 4,935,000.00
0 0.0 0 0 0 0 0.00 0.00 2,625,000.00
8,500,000.00 8500000 0.0 8500000 0 0 0 8,500,000.00 171.15 8,500,000.00
80,000.00 2,800,000.00 59,000.00 1272375 0.0 1440000 0 59000 0 1,603,800.00 32.29 4,966,500.00
63,000.00 48000 0.0 63000 0 0 0 53,000.00 0.71 7,450,065.00
150.000 / lonjor 0 125000.0 0 0 0 0 125,000.00 0.00 0.00
135,000.00 180,000.00 210.000 / lonjor 125.000 / lonjor 130,000.00 216,000.00 2,900,000.00 160,000.00 165,000.00 648571.428571429 120555.6 712200 112857.142857143 162500 842500 741,083.33 3.40 21,787,500.00
180,000.00 150,000.00 290,000.00 165,000.00 170,000.00 166,000.00 159868.421052632 150562.5 206666.666666667 147350 167000 131000 172,642.86 82.54 209,160.00
7,500,000.00 1970700 0.0 7500000 0 0 0 8,500,000.00 39.01 21,787,500.00
0 0.0 0 0 0 0 0.00 0.00 0.00
1750250 117000.0 0 105000 0 0 2,277,666.67 15.93 14,293,860.00
220000 155000.0 0 145000 0 0 222,500.00 156.50 222,500.00
180,000.00 7500000 0.0 180000 0 0 0 3,840,000.00 26.86 14,293,860.00
0 0.0 0 0 0 0 0.00 0.00 8,353,380.00
0 0.0 0 0 0 0 0.00 0.00 80,192.45
0 0.0 0 0 0 0 0.00 0.00 8,353,380.00
0 0.0 0 0 0 0 0.00 0.00 14,293,860.00
0 0.0 0 0 0 0 0.00 0.00 8,353,380.00
0 0.0 0 0 0 0 0.00 0.00 12,958,050.00
55,000.00 65,000.00 65,000.00 57000 0.0 55000 0 65000 0 61,666.67 0.48 12,958,050.00
75,500.00 85,000.00 65,000.00 5,500,000.00 3,000,000.00 85,000.00 1556000 71000.0 1745100 0 85000 71666.6666666667 1,242,531.25 7.85 15,836,047.50
110,500.00 6,000,000.00 2268000 78000.0 3055250 0 0 100000 2,183,312.50 13.19 16,555,560.00
73,500.00 1306000 90000.0 73500 0 0 0 1,721,166.67 23.10 7,450,065.00
5000000 0.0 0 0 0 0 5,000,000.00 59.86 8,353,380.00
1273000 70000.0 0 70000 0 0 2,535,000.00 25.53 9,931,425.00
1698333.33333333 0.0 0 60000 0 0 5,000,000.00 49.96 10,007,609.85
6,500,000.00 5000000 0.0 6500000 0 0 0 5,750,000.00 51.25 11,220,590.85
0 0.0 0 0 0 0 0.00 0.00 0.00
25.000 / lonjor 7,500,000.00 15,000.00 16,000.00 15,000.00 6500000 0.0 7500000 0 15333.3333333333 0 2,809,200.00 31.31 8,972,324.55
7,500,000.00 60,000.00 61,000.00 8500000 0.0 7500000 0 60500 0 4,030,250.00 44.92 8,972,324.55
0 0.0 0 0 0 0 0.00 0.00 9,403,065.00
70,000.00 7,500,000.00 85,000.00 10500000 0.0 3785000 0 85000 0 4,538,750.00 44.68 10,157,839.65
7,500,000.00 84,000.00 150,000.00 0 0.0 7500000 0 117000 0 2,578,000.00 25.38 10,157,839.65
7,500,000.00 150,000.00 0 0.0 7500000 0 150000 0 3,825,000.00 37.66 10,157,839.65
0 0.0 0 0 0 0 0.00 0.00 0.00
29,500.00 8,500,000.00 3,000,000.00 27,000.00 17,000.00 1893500 8000000.0 3843166.66666667 0 22000 0 3,867,642.86 28.55 13,544,685.00
112,000.00 8,500,000.00 100666.666666667 8000000.0 4306000 0 0 0 5,537,333.33 39.78 13,920,401.25
125000 0.0 0 0 0 0 0.00 0.00 14,293,860.00
10,000,000.00 0 0.0 10000000 0 0 0 10,000,000.00 57.80 17,302,144.65
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 14,293,860.00
0 0.0 0 0 0 0 0.00 0.00 21,787,500.00
0 0.0 0 0 0 0 0.00 0.00 4,966,500.00
0 0.0 0 0 0 0 0.00 0.00 3,150,000.00
0 0.0 0 0 0 0 0.00 0.00 3,150,000.00
0 0.0 0 0 0 0 0.00 0.00 23,546.25
0 0.0 0 0 0 0 0.00 0.00 5,268,610.20
12000 0.0 0 0 0 0 12,000.00 38.14 31,463.25
3,000,000.00 0 0.0 3000000 0 0 180000 1,590,000.00 45.89 3,465,000.00
0 0.0 0 0 0 0 0.00 0.00 21,787,500.00
0 0.0 0 0 0 0 0.00 0.00 14,293,860.00
0 0.0 0 0 0 0 0.00 0.00 8,353,380.00
0 0.0 0 0 0 0 0.00 0.00 9,623,100.00
0 0.0 0 0 0 0 0.00 0.00 21,787,500.00
0 0.0 0 0 0 0 0.00 0.00 14,293,860.00
0 0.0 0 0 0 0 0.00 0.00 797,475.00
0 0.0 0 0 0 0 0.00 0.00 8,353,380.00
0 0.0 0 0 0 0 0.00 0.00 2,677,500.00
0 0.0 0 0 0 0 0.00 0.00 0.00
5,000,000.00 57250 0.0 5000000 0 0 0 2,560,000.00 10.60 24,150,000.00
5,000,000.00 0 0.0 5000000 0 0 0 5,000,000.00 20.70 24,150,000.00
6,000,000.00 0 0.0 6000000 0 0 0 6,000,000.00 24.84 24,150,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
32500 0.0 0 0 0 0 80,000.00 0.48 16,557,896.25
0 0.0 0 0 0 0 0.00 0.00 16,928,625.00
0 0.0 0 0 0 0 0.00 0.00 17,302,144.65
0 0.0 0 0 0 0 0.00 0.00 0.00
22000 0.0 0 0 0 0 22,000.00 0.22 9,931,425.00
59 60 61 63 64 65 67 72 73 74 75 76 77 78 80 81 82 OLAHAN DATA
Kel. Oro-Oro
Kel. Gading Asri
Oro-oro Dowo UD. Bandung Dowo Kel. Oro-Oro Samaan Sikoharjo Toko Kelayatan (UD. Toko Besi dan UD. Barokah Lintas Alam Toko Restu Kedung [B] : HA RGA DA SAR
Toko Fauida (New Tunggal UD. Sentosa Listrik UD. Kuat Jaya UD Horas Jaya Dinoyo 1 Lowokwaru Blimbing Klojen Sukun Dinoyo [A] : RATA-RATA HARGA SURVEY % SELISIH HARGA 2018
(Lestari Jawa) Cipta Abadi (Langgeng Dowo (Bedak) (Rakha) Subur KKA Jaya) Kramik Lie Jaya Mahameru Jaya Kandang PERHI TUNGAN 2019
Jaya)
Jaya)
0 0.0 0 0 0 0 0.00 0.00 10,007,609.85
0 0.0 0 0 0 0 0.00 0.00 11,220,590.85
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 26,040,000.00
0 0.0 0 0 0 0 0.00 0.00 21,720,200.00
0 0.0 0 0 0 0 0.00 0.00 21,720,200.00
0 0.0 0 0 0 0 0.00 0.00 20,950,400.00
0 0.0 0 0 0 0 0.00 0.00 23,278,100.00
0 0.0 0 0 0 0 0.00 0.00 23,278,100.00
0 0.0 0 0 0 0 0.00 0.00 24,150,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 31,037,500.00
0 0.0 0 0 0 0 0.00 0.00 39,900,000.00
0 0.0 0 0 0 0 0.00 0.00 37,800,000.00
0 0.0 0 0 0 0 0.00 0.00 25,654,800.00
0 0.0 0 0 0 0 0.00 0.00 25,654,800.00
0 0.0 0 0 0 0 0.00 0.00 25,654,800.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 32,002,900.00
0 0.0 0 0 0 0 0.00 0.00 32,002,900.00
0 0.0 0 0 0 0 0.00 0.00 32,002,900.00
0 0.0 0 0 0 0 0.00 0.00 32,002,900.00
0 0.0 0 0 0 0 0.00 0.00 32,002,900.00
0 0.0 0 0 0 0 0.00 0.00 32,002,900.00
0 0.0 0 0 0 0 0.00 0.00 13,218,450.00
0 0.0 0 0 0 0 0.00 0.00 8,662,500.00
0 0.0 0 0 0 0 0.00 0.00 13,125,000.00
0 0.0 0 0 0 0 0.00 0.00 52,500.00
0 0.0 0 0 0 0 0.00 0.00 2,415,000.00
0 0.0 0 0 0 0 0.00 0.00 330,545.25
0 0.0 0 0 0 0 0.00 0.00 95,392.50
0 0.0 0 0 0 0 0.00 0.00 95,392.50
0 0.0 0 0 0 0 0.00 0.00 262,500.00
0 0.0 0 0 0 0 0.00 0.00 142,485.00
0 0.0 0 0 0 0 0.00 0.00 10,500.00
0 0.0 0 0 0 0 0.00 0.00 4,562,250.00
0 0.0 0 0 0 0 0.00 0.00 1,312,500.00
0 0.0 0 0 0 0 0.00 0.00 4,562,250.00
0 0.0 0 0 0 0 0.00 0.00 4,562,250.00
0 0.0 0 0 0 0 0.00 0.00 813,750.00
25,000.00 18,000.00 24583.3333333333 24375.0 21500 0 0 24000 23,000.00 122.99 23,000.00
0 0.0 0 0 0 0 0.00 0.00 8,951.25
0 0.0 0 0 0 0 0.00 0.00 35,805.00
0 0.0 0 0 0 0 0.00 0.00 35,805.00
0 0.0 0 0 0 0 0.00 0.00 69,667.50
0 0.0 0 0 0 0 0.00 0.00 143,010.00
40000 0.0 0 0 0 0 40,000.00 224.09 40,000.00
0 0.0 0 0 0 0 0.00 0.00 29,531.25
368,000.00 0 0.0 368000 0 0 0 368,000.00 243.85 368,000.00
0 0.0 0 0 0 0 0.00 0.00 99,750.00
488,000.00 0 0.0 488000 0 0 0 488,000.00 704.18 488,000.00
11,000.00 0 0.0 11000 0 0 0 11,000.00 35.37 31,100.00
0 40000.0 0 0 0 0 40,000.00 21.16 189,000.00
0 0.0 0 0 0 0 0.00 0.00 47,355.00
100000 0.0 0 0 0 0 100,000.00 334.17 100,000.00
52,800.00 0 0.0 52800 0 0 0 52,800.00 39.91 132,300.00
72,000.00 86250 60000.0 72000 0 0 0 76,750.00 58.77 130,600.00
108,800.00 106807.692307692 90000.0 108800 101166.666666667 0 0 107,200.00 54.20 197,800.00
146,000.00 195000 175000.0 146000 0 0 0 180,250.00 47.26 381,400.00
199,000.00 350000 0.0 199000 0 0 0 199,000.00 36.02 552,500.00
0 0.0 0 0 0 0 0.00 0.00 890,400.00
77,000.00 92500 65000.0 77000 0 0 0 83,000.00 42.61 194,800.00
112,000.00 100615.384615385 90000.0 112000 95555.5555555556 0 0 103,000.00 36.10 285,300.00
191250 0.0 0 0 0 0 195,000.00 33.43 583,300.00
350000 0.0 0 0 0 0 0.00 0.00 937,125.00
0 0.0 0 0 0 0 0.00 0.00 526,500.00
96666.6666666667 85000.0 0 0 0 0 90,000.00 46.83 192,200.00
135,000.00 120000 120000.0 135000 0 0 0 123,750.00 42.73 289,600.00
0 0.0 0 0 0 0 0.00 0.00 326,000.00
67,500.00 150000 11000.0 67500 0 0 0 102,125.00 31.55 323,700.00
146,000.00 240000 175000.0 146000 0 0 0 160,500.00 38.78 413,900.00
216,000.00 270000 0.0 216000 0 0 0 243,000.00 58.37 416,325.00
0 0.0 0 0 0 0 0.00 0.00 750,000.00
1250000 1250000.0 0 0 0 0 1,250,000.00 64.37 1,941,765.00
25000 0.0 0 24562.5 0 0 25,000.00 69.01 36,225.00
0 0.0 0 0 0 0 0.00 0.00 792,949.50
20,000.00 22,000.00 16,000.00 17,500.00 37000 0.0 21000 20000 16750 19000 21,916.67 76.37 28,697.60
20,000.00 85,000.00 17,000.00 30,000.00 22,000.00 25075 12272.7 30600 26055.5555555556 22000 22400 19,672.92 78.10 25,187.79
21,500.00 15,000.00 19,000.00 22,000.00 20,000.00 37000 27500.0 19583.3333333333 24166.6666666667 0 0 23,277.78 81.11 28,697.60
2.500 / 1m 30,000.00 0 0.0 0 21900 30000 0 30,000.00 110.29 30,000.00
20,000.00 0 0.0 20000 0 0 0 20,000.00 32.84 60,900.00
20,000.00 0 21000.0 20000 0 0 0 20,500.00 33.66 60,900.00
20,000.00 0 0.0 20000 0 0 0 20,000.00 32.84 60,900.00
0 21000.0 0 0 0 0 21,000.00 34.48 60,900.00
100000 0.0 0 0 0 23500 49,000.00 198.58 49,000.00
21,500.00 17,000.00 19,000.00 17,500.00 20,000.00 22500 22571.4 51000 26708.3333333333 20000 19400 27,148.15 99.47 27,293.70
37000 25000.0 0 25000 0 40000 34,000.00 38.10 89,250.00
37000 46250.0 0 33750 0 29000 35,071.43 39.30 89,250.00
65000 0.0 0 45000 0 35000 50,000.00 43.79 114,187.50
15000 0.0 0 0 0 0 15,000.00 21.31 70,400.00
22,000.00 22000 0.0 22000 25000 0 0 22,000.00 67.37 32,655.00
20,000.00 0 0.0 20000 0 0 20000 20,000.00 21.11 94,736.25
20,000.00 0 0.0 20000 0 0 0 20,000.00 30.98 64,551.90
90,000.00 95000 2500.0 90000 0 0 2416.665 38,466.67 111.69 38,466.67
90,000.00 50000 24000.0 0 17916.6666666667 90000 59000 48,625.00 141.19 48,625.00
25,000.00 20,000.00 20,000.00 21500 0.0 25000 25000 20000 0 21,600.00 69.45 31,100.00
20,000.00 0 0.0 20000 0 0 0 20,000.00 60.47 33,075.00
0 0.0 0 0 0 0 0.00 0.00 11,025.00
0 0.0 0 0 0 0 0.00 0.00 69,900.00
0 0.0 0 0 0 0 0.00 0.00 36,225.00
0 0.0 0 0 0 18000 18,000.00 11.43 157,500.00
15,000.00 15,000.00 0 0.0 15000 0 0 0 15,000.00 78.28 19,162.50
18,000.00 16,000.00 16,000.00 20,000.00 20,000.00 0 19900.0 17666.6666666667 17181.8181818182 0 16166.6666666667 18,272.73 94.64 19,308.33
17,000.00 15,000.00 17,000.00 16,000.00 0 19800.0 16250 16681.8181818182 0 17666.6666666667 18,083.33 98.48 18,363.33
17,000.00 18,000.00 15,000.00 17,000.00 16,000.00 0 18125.0 16600 16636.3636363636 0 20000 18,119.05 94.55 19,162.50
17,000.00 15,000.00 16,000.00 0 17687.5 16000 16727.2727272727 0 15500 16,961.54 96.44 17,587.50
16,000.00 16,000.00 0 16800.0 16000 16333.3333333333 0 16000 16,500.00 93.91 17,570.00
16,000.00 20,000.00 16,000.00 35,000.00 18,000.00 22,000.00 17,000.00 25000 16692.3 21750 16950 19000 16333.3333333333 18,125.00 98.64 18,375.00
16,000.00 20,000.00 17,000.00 16,000.00 35,000.00 18,000.00 20,500.00 17,000.00 25000 17333.3 20800 16850 18500 15800 18,134.62 94.64 19,162.50
16,000.00 20,000.00 17,000.00 35,000.00 20,000.00 18,000.00 20,000.00 17,000.00 25000 17375.0 21600 16700 18333.3333333333 15800 18,454.55 96.31 19,162.50
16,000.00 17,000.00 35,000.00 20,000.00 18,000.00 20,000.00 17,000.00 20000 17375.0 22000 16727.2727272727 18333.3333333333 15800 18,142.86 102.65 18,142.86
16,000.00 20,000.00 17,000.00 20,000.00 17,500.00 20,000.00 18,500.00 19,000.00 20000 17666.7 18100 17250 19166.6666666667 15800 17,650.00 97.61 18,081.62
16,000.00 20,000.00 20,000.00 17,500.00 20,000.00 17,500.00 19,000.00 20000 17750.0 18375 17100 18833.3333333333 16333.3333333333 18,000.00 98.80 18,219.44
16,000.00 20,000.00 20,000.00 17,500.00 22,000.00 17,500.00 19,000.00 20000 16500.0 18375 17312.5 19500 16333.3333333333 17,800.00 92.89 19,162.50
16,000.00 20,000.00 20000 15500.0 18000 0 0 18000 17,500.00 99.88 17,521.88
16,000.00 0 16000.0 16000 0 0 0 16,000.00 94.65 16,905.00
0 16000.0 0 0 0 0 16,000.00 53.66 29,820.00
0 0.0 0 0 0 0 0.00 0.00 24,325.00
19,500.00 0 0.0 19500 0 0 0 19,500.00 99.05 19,687.50
15,500.00 25,000.00 0 0.0 20250 0 0 17000 19,166.67 100.02 19,166.67
20.000 / kotak 48,500.00 50,000.00 10000 8000.0 0 0 49250 0 29,125.00 195.34 29,125.00
20.000 / kotak 12.000 / kotak 250.00 48,500.00 50,000.00 0 8783.3 250 6000 49250 200000 35,145.00 92.72 37,905.00
30.000 / kotak 52.000 / kotak 6,000.00 0 10375.0 6000 20000 0 500000 91,250.00 95.41 95,637.50
35.000 / kotak 10,000.00 0 3750.0 10000 28000 0 500000 129,375.00 125.65 129,375.00
60,000.00 0 22750.0 60000 40000 0 750000 213,875.00 95.57 223,781.25
18,500.00 35,000.00 20,000.00 17,000.00 0 28750.0 24500 18909.0909090909 17000 25000 24,777.78 87.65 28,267.97
16,000.00 20,000.00 16,000.00 35,000.00 17,000.00 0 18000.0 21750 19500 17000 0 20,333.33 94.88 21,431.25
45,000.00 35000/Kg 38.000 / kg 50.000 / kg 40.000 / kg 55,000.00 28,000.00 35,000.00 30,000.00 40000 39500.0 50000 40055.5555555556 31000 30000 38,272.73 13.50 283,500.00
45,500.00 45,000.00 40,000.00 30,000.00 0 36250.0 43500 35950 30000 0 38,187.50 82.84 46,100.00
0 0.0 0 0 0 0 0.00 0.00 18,165.00
0 0.0 0 0 0 0 0.00 0.00 18,165.00
5,000.00 1,500.00 2,000.00 2000 3750.0 5000 0 1750 5500 3,625.00 19.96 18,165.00
500.00 1,000.00 1,000.00 1,500.00 2,000.00 0 2000.0 875 0 1750 10000 2,375.00 29.38 8,085.00
1,000.00 4,500.00 2,000.00 0 0.0 2750 0 2000 1500 2,250.00 41.21 5,460.00
1,500.00 0 0.0 1500 0 0 2250 2,000.00 24.74 8,085.00
0 0.0 0 0 0 0 0.00 0.00 31,900.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 12,600.00
1,500.00 4,500.00 0 0.0 0 0 3000 0 3,000.00 30.08 9,975.00
1,500.00 4,500.00 0 0.0 0 0 3000 0 3,000.00 27.21 11,025.00
0 0.0 0 0 0 0 0.00 0.00 18,375.00
15,000.00 14,000.00 0 0.0 0 0 14500 0 14,500.00 84.30 17,200.00
0 0.0 0 0 0 0 0.00 0.00 157.50
35,000.00 16,000.00 16,000.00 17,000.00 20000 0.0 35000 0 16333.3333333333 0 20,800.00 0.20 10,342,500.00
23,000.00 37000 0.0 0 0 23000 0 30,000.00 0.29 10,342,500.00
0 0.0 0 0 0 55000 55,000.00 0.42 13,065,837.75
60,500.00 57,500.00 45,000.00 50,000.00 60,000.00 55,000.00 70,000.00 55,000.00 70,000.00 69,000.00 57,000.00 59000 64833.3 56333.3333333333 55545.4545454546 65333.3333333333 54750 60,234.38 78.45 76,782.30
72,000.00 67,000.00 63,000.00 75,000.00 68,000.00 80,000.00 80,500.00 79,000.00 70,000.00 72500 76583.3 70833.3333333333 67409.0909090909 76500 68000 73,517.86 69.75 105,400.00
60,000.00 80000 67500.0 0 0 60000 42000 66,166.67 89.01 74,340.00
64000 51000.0 0 0 0 0 56,200.00 48.81 115,136.70
170000 0.0 0 165857.142857143 0 0 170,000.00 79.09 214,935.00
230000 0.0 0 217928.571428571 0 0 230,000.00 86.92 264,600.00
125,000.00 0 0.0 125000 0 0 0 125,000.00 104.80 125,000.00
117000 0.0 0 125071.428571429 0 0 117,000.00 88.44 132,300.00
56,000.00 0 0.0 0 0 56000 0 56,000.00 39.27 142,590.00
0 0.0 0 0 0 0 0.00 0.00 301,875.00
0 0.0 0 0 0 0 0.00 0.00 227,082.45
0 0.0 0 0 0 0 0.00 0.00 141,926.40
80,000.00 79,000.00 0 0.0 0 0 79500 0 79,500.00 56.01 141,926.40
92,000.00 92,000.00 0 0.0 0 0 92000 0 92,000.00 49.86 184,504.95
0 0.0 0 0 0 0 0.00 0.00 109,200.00
130,000.00 0 0.0 0 0 130000 0 130,000.00 126.34 130,000.00
175,000.00 0 0.0 175000 0 0 0 175,000.00 181.16 175,000.00
0 0.0 0 0 0 0 0.00 0.00 63,905.10
0 0.0 0 0 0 0 0.00 0.00 92,251.95
0 0.0 0 0 0 0 0.00 0.00 131,900.00
0 0.0 0 0 0 0 0.00 0.00 100,900.00
0 0.0 0 0 0 0 0.00 0.00 51,345.00
20000 0.0 0 0 0 0 20,000.00 118.68 20,000.00
0 0.0 0 40000 0 0 0.00 0.00 67,410.00
0 0.0 0 0 0 0 0.00 0.00 67,410.00
0 0.0 0 0 0 0 0.00 0.00 67,410.00
20,000.00 22000 24000.0 20000 34583.3333333333 0 21000 22,909.09 40.84 56,100.00
27,000.00 36000 44000.0 27000 43166.6666666667 0 27500 38,812.50 52.79 73,517.85
0 0.0 0 90000 0 0 0.00 0.00 100,800.00
0 0.0 0 0 0 0 0.00 0.00 83,737.50
0 0.0 0 0 0 0 0.00 0.00 105,025.50
49,000.00 61,000.00 62,000.00 55,000.00 90000 47666.7 49000 60791.6666666667 59333.3333333333 65000 58,333.33 87.43 66,720.65
56,000.00 67,000.00 6,700.00 65,000.00 0 65666.7 56000 0 46233.3333333333 70000 57,712.50 85.08 67,830.00
76,000.00 75,000.00 75,000.00 0 40250.0 0 0 75333.3333333333 55000 59,500.00 29.42 202,230.00
Kel. Oro-Oro
Kel. Gading Asri
Oro-oro Dowo UD. Bandung Dowo Kel. Oro-Oro Samaan Sikoharjo Toko Kelayatan (UD. Toko Besi dan UD. Barokah Lintas Alam Toko Restu Kedung [B] : HA RGA DA SAR
Toko Fauida (New Tunggal UD. Sentosa Listrik UD. Kuat Jaya UD Horas Jaya Dinoyo 1 Lowokwaru Blimbing Klojen Sukun Dinoyo [A] : RATA-RATA HARGA SURVEY % SELISIH HARGA 2018
(Lestari Jawa) Cipta Abadi (Langgeng Dowo (Bedak) (Rakha) Subur KKA Jaya) Kramik Lie Jaya Mahameru Jaya Kandang PERHI TUNGAN 2019
Jaya)
Jaya)
0 0.0 0 0 0 0 0.00 0.00 163,000.00
210,000.00 25,000.00 900,000.00 303,000.00 195,000.00 200,000.00 700000 221428.6 323600 20000 197500 199000 262,900.00 126.38 262,900.00
185,000.00 170,000.00 250,000.00 185,000.00 230000 200000.0 201666.666666667 0 185000 180000 195,555.56 36.02 542,900.00
0 200000.0 0 0 0 600000 400,000.00 59.92 667,590.00
0 0.0 0 0 0 175000 175,000.00 6.66 2,629,100.00
0 250000.0 0 0 0 0 250,000.00 7.46 3,349,600.00
0 0.0 0 0 0 0 0.00 0.00 183,987.30
240,000.00 0 0.0 240000 0 0 0 240,000.00 93.18 257,565.00
299,000.00 0 0.0 299000 0 0 0 299,000.00 538.31 299,000.00
18,500.00 10,000.00 17,500.00 7,000.00 7,500.00 5000 7375.0 15333.3333333333 6687.5 7250 9000 9,384.62 26.44 35,500.00
6,000.00 10,000.00 11,000.00 7,000.00 7,500.00 0 5000.0 9000 6500 7250 9000 8,166.67 40.63 20,100.00
40,000.00 4,500.00 15000 0.0 22250 16437.5 0 0 19,833.33 44.77 44,300.00
121,000.00 0 0.0 121000 0 0 0 121,000.00 6.21 1,947,600.00
250,000.00 0 0.0 250000 0 0 0 250,000.00 115.63 250,000.00
12,000.00 0 0.0 12000 16000 0 0 12,000.00 36.17 33,180.00
0 0.0 0 16600 0 0 0.00 0.00 262,500.00
108,000.00 0 0.0 108000 0 0 0 108,000.00 27.00 400,050.00
0 0.0 0 0 0 0 0.00 0.00 800,090.55
12,000.00 0 0.0 12000 20000 0 0 12,000.00 33.13 36,225.00
24,000.00 20,000.00 15,000.00 12,000.00 25,000.00 20,000.00 35,000.00 19,500.00 27,500.00 22,000.00 25,000.00 20000 17590.9 22000 21708.3333333333 23500 17666.6666666667 19,465.52 38.15 51,030.00
45,000.00 0 25000.0 45000 23000 0 11000 23,857.14 104.00 23,857.14
1,300,000.00 0 27500.0 1300000 15000 0 0 451,666.67 286.77 451,666.67
15000 37500.0 0 0 0 0 30,000.00 76.19 39,375.00
50,000.00 150,000.00 95,000.00 125,000.00 110,000.00 171,000.00 20,000.00 85000 88055.6 105750 48272.7272727273 0 72000 90,586.96 111.07 90,586.96
80,000.00 45,000.00 385,000.00 85000 80000.0 170000 150000 0 170000 140,833.33 83.99 167,685.00
55,000.00 333,500.00 0 15000.0 194250 0 0 0 134,500.00 80.21 167,685.00
0 0.0 0 0 0 0 0.00 0.00 141,435.00
385,000.00 0 0.0 385000 0 0 0 385,000.00 1,273.15 385,000.00
172,500.00 0 0.0 172500 0 0 17000 94,750.00 42.93 220,710.00
22,000.00 20,000.00 15,000.00 15,000.00 18,000.00 95,000.00 0 16318.2 29071.4285714286 12772.7272727273 0 16900 20,326.09 106.36 20,326.09
33,000.00 15000 0.0 33000 0 0 0 24,000.00 107.31 24,000.00
475,000.00 250000 0.0 475000 0 0 300000 341,666.67 7.23 4,725,000.00
85,000.00 400,000.00 300,000.00 0 302000.0 261666.666666667 0 0 281666.666666667 285,454.55 38.84 735,000.00
180,000.00 180,000.00 500,000.00 180,000.00 150,000.00 125,000.00 150,000.00 225,000.00 125000 195769.2 209285.714285714 150000 225000 177500 193,750.00 42.81 452,550.00
120,000.00 300,000.00 220,000.00 0 200000.0 210000 0 220000 0 210,000.00 50.29 417,585.00
0 0.0 0 0 0 0 0.00 0.00 3,675,000.00
25,000.00 50000 36666.7 25000 25000 0 36250 36,666.67 69.84 52,500.00
25,000.00 20000 0.0 25000 0 0 0 22,500.00 23.81 94,500.00
13,000.00 14,000.00 10000 0.0 0 0 13500 0 12,333.33 30.91 39,900.00
1,000,000.00 1,750,000.00 0 0.0 1375000 0 0 1600000 1,450,000.00 85.77 1,690,500.00
450,000.00 1,000,000.00 1,105,000.00 400,000.00 500,000.00 350000 355454.5 691000 364625 0 775000 515,000.00 21.72 2,370,824.40
95,000.00 1,400,000.00 800,000.00 2500000 0.0 765000 0 0 140000 845,833.33 29.84 2,835,000.00
300,000.00 175,555.00 120,000.00 130,000.00 150000 133076.9 198518.333333333 143954.545454545 130000 136250 143,207.05 55.00 260,400.00
150,000.00 400,000.00 120,000.00 160000 16000.0 275000 125000 120000 0 169,200.00 20.14 840,000.00
0 0.0 0 0 0 190000 190,000.00 128.34 190,000.00
300,000.00 300,000.00 250,000.00 300000 250000.0 283333.333333333 452642.857142857 0 187500 253,125.00 38.35 659,979.60
1,000,000.00 650,000.00 180000 0.0 825000 0 0 0 610,000.00 26.41 2,310,000.00
25,000.00 12000 0.0 25000 0 0 0 18,500.00 39.15 47,250.00
55,000.00 0 65000.0 55000 0 0 0 60,000.00 2,857.14 60,000.00
45,000.00 0 55000.0 45000 0 0 0 50,000.00 1,470.59 50,000.00
50,000.00 0 0.0 50000 0 0 0 50,000.00 1,225.72 50,000.00
0 0.0 0 37000 0 0 0.00 0.00 36,800.00
0 0.0 0 0 0 0 0.00 0.00 62,874.00
0 0.0 0 0 0 0 0.00 0.00 2,100.00
0 0.0 0 0 0 0 0.00 0.00 52,995.60
0 0.0 0 0 0 0 0.00 0.00 61,794.60
0 0.0 0 0 0 0 0.00 0.00 11,550.00
0 0.0 0 0 0 0 0.00 0.00 10,500.00
0 0.0 0 0 0 0 0.00 0.00 71,085.00
0 0.0 0 0 0 0 0.00 0.00 84,735.00
0 0.0 0 0 0 0 0.00 0.00 115,290.00
0 0.0 0 0 0 0 0.00 0.00 5,040.00
0 0.0 0 0 0 0 0.00 0.00 7,140.00
0 0.0 0 0 0 0 0.00 0.00 3,675.00
0 0.0 0 0 0 0 0.00 0.00 10,185.00
0 0.0 0 0 0 0 0.00 0.00 26,145.00
0 0.0 0 0 0 0 0.00 0.00 6,825.00
0 0.0 0 47500 0 0 0.00 0.00 49,875.00
62,000.00 0 0.0 62000 37000 0 0 62,000.00 117.39 62,000.00
0 0.0 0 60000 0 0 0.00 0.00 63,000.00
0 0.0 0 0 0 0 0.00 0.00 15,750.00
0 0.0 0 0 0 0 0.00 0.00 15,750.00
0 0.0 0 0 0 0 0.00 0.00 21,000.00
0 0.0 0 0 0 0 0.00 0.00 14,910.00
0 0.0 0 0 0 0 0.00 0.00 14,910.00
0 0.0 0 0 0 0 0.00 0.00 57,960.00
20000 0.0 0 2000 0 0 20,000.00 614.44 20,000.00
0 0.0 0 0 0 0 0.00 0.00 3,675.00
0 0.0 0 0 0 0 0.00 0.00 3,400.00
40,000.00 50000 0.0 0 3636.36 40000 0 45,000.00 660.36 45,000.00
39,000.00 0 0.0 0 4727.27 39000 0 39,000.00 443.23 39,000.00
45,500.00 45,000.00 55000 0.0 0 0 45250 0 48,500.00 253.79 48,500.00
0 0.0 0 0 0 0 0.00 0.00 22,708.35
0 0.0 0 0 0 0 0.00 0.00 6,930.00
0 0.0 0 0 0 0 0.00 0.00 1,575.00
0 0.0 0 0 0 0 0.00 0.00 2,625.00
0 0.0 0 0 0 0 0.00 0.00 10,080.00
0 0.0 0 0 0 0 0.00 0.00 19,320.00
0 0.0 0 0 0 0 0.00 0.00 1,575.00
0 0.0 0 0 0 0 0.00 0.00 16,065.00
0 0.0 0 0 0 0 0.00 0.00 1,680.00
0 0.0 0 0 0 0 0.00 0.00 1,785.00
0 0.0 0 0 0 0 0.00 0.00 1,600.00
0 0.0 0 0 0 0 0.00 0.00 1,995.00
0 0.0 0 0 0 0 0.00 0.00 1,600.00
0 0.0 0 0 0 0 0.00 0.00 3,400.00
0 0.0 0 0 0 0 0.00 0.00 1,600.00
0 0.0 0 0 0 0 0.00 0.00 338,300.00
0 0.0 0 0 0 0 0.00 0.00 5,400.00
0 0.0 0 0 0 0 0.00 0.00 7,140.00
0 0.0 0 0 0 0 0.00 0.00 5,040.00
0 0.0 0 0 0 0 0.00 0.00 3,000.00
0 0.0 0 0 0 0 0.00 0.00 4,300.00
0 0.0 0 0 0 0 0.00 0.00 7,140.00
0 0.0 0 0 0 0 0.00 0.00 6,800.00
0 0.0 0 0 0 0 0.00 0.00 9,700.00
0 0.0 0 0 0 0 0.00 0.00 14,910.00
0 0.0 0 0 0 0 0.00 0.00 21,945.00
0 0.0 0 0 0 0 0.00 0.00 26,250.00
0 0.0 0 0 0 0 0.00 0.00 26,250.00
0 0.0 0 0 0 0 0.00 0.00 31,500.00
140,000.00 45,000.00 0 0.0 140000 0 45000 0 92,500.00 117.46 92,500.00
0 0.0 0 0 0 0 0.00 0.00 105,000.00
0 0.0 0 0 0 0 0.00 0.00 14,200.00
0 0.0 0 0 0 0 0.00 0.00 20,900.00
0 0.0 0 0 0 0 0.00 0.00 10,500.00
0 0.0 0 0 0 0 0.00 0.00 13,125.00
0 0.0 0 0 0 0 0.00 0.00 13,125.00
0 0.0 0 0 0 0 0.00 0.00 14,200.00
0 0.0 0 0 0 0 0.00 0.00 26,500.00
0 0.0 0 0 0 0 0.00 0.00 89,250.00
0 0.0 0 0 0 0 0.00 0.00 638,400.00
0 0.0 0 0 0 0 0.00 0.00 36,750.00
0 0.0 0 0 0 0 0.00 0.00 47,250.00
0 0.0 0 0 0 0 0.00 0.00 47,250.00
0 0.0 0 0 0 0 0.00 0.00 66,847.20
0 0.0 0 0 0 0 0.00 0.00 11,779.95
0 0.0 0 0 0 0 0.00 0.00 149,023.35
0 0.0 0 0 0 0 0.00 0.00 63,015.75
0 0.0 0 0 0 0 0.00 0.00 15,750.00
0 0.0 0 0 0 0 0.00 0.00 326,550.00
0 0.0 0 0 0 0 0.00 0.00 54,600.00
0 0.0 0 0 0 0 0.00 0.00 811,125.00
0 0.0 0 0 0 0 0.00 0.00 135,240.00
0 0.0 0 0 0 0 0.00 0.00 1,303,995.00
0 0.0 0 0 0 0 0.00 0.00 217,350.00
0 0.0 0 0 0 0 0.00 0.00 1,692,495.00
0 0.0 0 0 0 0 0.00 0.00 282,082.50
0 0.0 0 0 0 0 0.00 0.00 2,542,470.00
0 0.0 0 0 0 0 0.00 0.00 423,780.00
0 0.0 0 0 0 0 0.00 0.00 3,603,285.00
0 0.0 0 0 0 0 0.00 0.00 600,600.00
0 0.0 0 0 0 0 0.00 0.00 4,768,680.00
0 0.0 0 0 0 0 0.00 0.00 794,850.00
0.0 0 0 0 0 0.00 8,996,000.00
0 0.0 0 0 0 0 0.00 0.00 2,432,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 630,840.00
0 0.0 0 0 0 0 0.00 0.00 157,710.00
0 0.0 0 0 0 0 0.00 0.00 818,580.00
0 0.0 0 0 0 0 0.00 0.00 204,645.00
0 0.0 0 0 0 0 0.00 0.00 1,338,960.00
0 0.0 0 0 0 0 0.00 0.00 334,740.00
0 0.0 0 0 0 0 0.00 0.00 2,086,560.00
0 0.0 0 0 0 0 0.00 0.00 521,640.00
0 0.0 0 0 0 0 0.00 0.00 3,251,640.00
0 0.0 0 0 0 0 0.00 0.00 812,910.00
0 0.0 0 0 0 0 0.00 0.00 5,160,120.00
0 0.0 0 0 0 0 0.00 0.00 1,290,030.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 0.00 2,249,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 2,600,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 2,925,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 3,360,500.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 4,498,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 4,940,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 5,616,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 6,142,500.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 6,747,000.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 66,900.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 86,600.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 117,900.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 159,100.20
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 337,359.75
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 529,200.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 151,524.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 226,230.90
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 315,929.25
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 321,295.00
0.0 0 0 0 0 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 437,810.00
0 0.0 0 0 0 0 0.00 0.00 708,960.00
0 0.0 0 0 0 0 0.00 0.00 177,240.00
0 0.0 0 0 0 0 0.00 0.00 1,417,500.00
0 0.0 0 0 0 0 0.00 0.00 354,375.00
0 0.0 0 0 0 0 0.00 0.00 1,753,500.00
0 0.0 0 0 0 0 0.00 0.00 438,375.00
0 0.0 0 0 0 0 0.00 0.00 2,271,780.00
0 0.0 0 0 0 0 0.00 0.00 567,945.00
0 0.0 0 0 0 0 0.00 0.00 3,223,500.00
0 0.0 0 0 0 0 0.00 0.00 805,875.00
0 0.0 0 0 0 0 0.00 0.00 4,328,100.00
0 0.0 0 0 0 0 0.00 0.00 1,082,025.00
0 0.0 0 0 0 0 0.00 0.00 7,207,620.00
0 0.0 0 0 0 0 0.00 0.00 1,801,905.00
0 0.0 0 0 0 0 0.00 0.00 152,985.00
0 0.0 0 0 0 0 0.00 0.00 38,325.00
0 0.0 0 0 0 0 0.00 0.00 233,100.00
0 0.0 0 0 0 0 0.00 0.00 58,275.00
0 0.0 0 0 0 0 0.00 0.00 360,360.00
0 0.0 0 0 0 0 0.00 0.00 90,090.00
0 0.0 0 0 0 0 0.00 0.00 708,330.00
0 0.0 0 0 0 0 0.00 0.00 177,135.00
0 0.0 0 0 0 0 0.00 0.00 1,071,210.00
0 0.0 0 0 0 0 0.00 0.00 267,855.00
0 0.0 0 0 0 0 0.00 0.00 1,632,120.00
0 0.0 0 0 0 0 0.00 0.00 408,030.00
0 0.0 0 0 0 0 0.00 0.00 2,315,565.00
0 0.0 0 0 0 0 0.00 0.00 578,970.00
7,250.00 13,750.00 8,750.00 5,500.00 7,500.00 7,000.00 25,000.00 29,000.00 29,500.00 30,000.00 26000 6609.4 10093.75 7135.41666666667 29500 6791.66666666667 10,051.47 72.26 13,909.35
0.0 0 0 0 0 0.00 0.00
8,125.00 7,500.00 10,000.00 6,500.00 8,750.00 8,000.00 32,000.00 34,000.00 34,500.00 36,000.00 35000 8609.4 11046.875 8108.33333333333 34833.3333333333 8333.33333333333 12,224.26 59.40 20,578.95
59 60 61 63 64 65 67 72 73 74 75 76 77 78 80 81 82 OLAHAN DATA
Kel. Oro-Oro
Kel. Gading Asri
Oro-oro Dowo UD. Bandung Dowo Kel. Oro-Oro Samaan Sikoharjo Toko Kelayatan (UD. Toko Besi dan UD. Barokah Lintas Alam Toko Restu Kedung [B] : HA RGA DA SAR
Toko Fauida (New Tunggal UD. Sentosa Listrik UD. Kuat Jaya UD Horas Jaya Dinoyo 1 Lowokwaru Blimbing Klojen Sukun Dinoyo [A] : RATA-RATA HARGA SURVEY % SELISIH HARGA 2018
(Lestari Jawa) Cipta Abadi (Langgeng Dowo (Bedak) (Rakha) Subur KKA Jaya) Kramik Lie Jaya Mahameru Jaya Kandang PERHI TUNGAN 2019
Jaya)
Jaya)
0.0 0 0 0 0 0.00 0.00
10,625.00 15,000.00 8,000.00 11,250.00 13,000.00 44,000.00 44,000.00 43,000.00 46,000.00 45000 10601.6 15910.7142857143 12340.3846153846 44333.3333333333 10208.3333333333 15,765.15 58.46 26,966.10
0.0 0 0 0 0 0.00 0.00
17,875.00 22,500.00 9,500.00 13,750.00 15,000.00 75,000.00 79,000.00 79,000.00 85,000.00 80000 12187.5 24482.1428571429 18037.5 81000 14708.3333333333 27,515.63 76.03 36,191.40
0.0 0 0 0 0 0.00 0.00
27,000.00 13,750.00 15,000.00 18,750.00 95,500.00 115,000.00 116,000.00 60,000.00 48000 14031.3 34000 23075 97000 14187.5 34,190.79 74.35 45,984.75
0.0 0 0 0 0 0.00 0.00
33,750.00 31,750.00 16,250.00 21,250.00 139,000.00 89,000.00 60000 17062.5 48400 28825 89000 16062.5 32,919.12 55.89 58,899.75
0.0 0 0 0 0 0.00 0.00
47,000.00 45,500.00 18,750.00 37,500.00 196,000.00 70000 22968.8 68950 62750 0 17062.5 39,539.06 47.54 83,169.45
0.0 0 0 0 0 0.00 0.00
37,500.00 48,500.00 20,000.00 62,500.00 325,000.00 88000 32843.8 98700 90660 0 17187.5 54,914.06 42.24 130,004.70
27,125.00 106,000.00 125,000.00 0 28750.0 66562.5 31862.5 125000 16875 60,750.00 26.84 226,373.70
167,000.00 173,000.00 0 38750.0 167000 37388.8888888889 173000 0 126,250.00 41.92 301,168.35
725,000.00 0 0.0 725000 122400 0 0 725,000.00 1,552.68 725,000.00
1,250,000.00 0 0.0 1250000 190350 0 0 1,250,000.00 2,190.87 1,250,000.00
7,000.00 0 0.0 7000 0 0 0 7,000.00 109.38 7,000.00
8,500.00 0 0.0 8500 0 0 0 8,500.00 93.58 9,083.55
10,500.00 0 0.0 10500 0 0 0 10,500.00 89.13 11,779.95
8,750.00 13,250.00 47,000.00 42,500.00 0 10916.7 19375 10042.8571428571 42500 12281.25 16,822.92 92.60 18,167.10
11,750.00 15,000.00 60,000.00 58,500.00 0 14093.8 24812.5 11875 58500 11750 20,086.54 106.41 20,086.54
16,250.00 18,000.00 80,000.00 81,500.00 0 15281.3 31875 18685.7142857143 81500 18175 25,785.71 80.04 32,217.15
25,250.00 27,500.00 110,000.00 125,000.00 0 20781.3 44593.75 27400 125000 20968.75 36,182.69 77.49 46,693.50
34,750.00 37,500.00 167,000.00 173,000.00 0 24781.3 64718.75 38025 173000 29900 48,607.14 85.19 57,054.90
0 37500.0 0 0 0 0 37,500.00 750.00 37,500.00
0 0.0 0 0 0 50000 50,000.00 675.68 50,000.00
0 0.0 0 0 0 0 0.00 0.00 8,941.80
6,250.00 0 8125.0 6250 0 0 0 7,500.00 62.91 11,921.70
8,000.00 46,500.00 0 11437.5 8000 11446.4285714286 46500 11000 15,892.86 86.80 18,308.85
9,750.00 62,000.00 0 13625.0 9750 14321.4285714286 62000 14000 20,035.71 86.08 23,276.40
12,000.00 73,000.00 0 15875.0 12000 16392.8571428571 73000 15750 23,464.29 85.22 27,534.15
16,250.00 92,000.00 0 19000.0 16250 0 92000 20750 29,285.71 83.54 35,056.35
8,000.00 0 10000.0 0 0 8000 0 9,000.00 78.26 11,500.00
0 0.0 0 0 0 0 0.00 0.00 240,991.80
0 0.0 0 0 0 0 0.00 0.00 226,373.70
515,000.00 0 0.0 515000 0 0 0 515,000.00 259.37 515,000.00
0 0.0 0 102300 0 0 0.00 0.00 137,953.20
0 0.0 0 218800 0 0 0.00 0.00 297,903.90
0 0.0 0 410325 0 0 0.00 0.00 482,408.85
0 0.0 0 33850 0 0 0.00 0.00 45,274.95
0 0.0 0 48375 0 0 0.00 0.00 63,157.50
0 0.0 0 69900 0 0 0.00 0.00 93,955.05
7,000.00 8,000.00 0 0.0 0 6000 7500 0 7,500.00 59.52 12,600.00
0 0.0 0 0 0 0 0.00 0.00 800,625.00
0 0.0 0 0 0 0 0.00 0.00 1,321,687.50
0 0.0 0 0 0 0 0.00 0.00 1,725,255.00
0 0.0 0 0 0 0 0.00 0.00 2,428,125.00
0 0.0 0 0 0 0 0.00 0.00 4,560,937.50
0 0.0 0 0 0 0 0.00 0.00 543,300.00
0 0.0 0 0 0 0 0.00 0.00 403,600.00
0 0.0 0 0 0 0 0.00 0.00 12,600.00
0 0.0 0 0 0 0 0.00 0.00 21,000.00
0 0.0 0 0 0 0 0.00 0.00 63,982.80
0 0.0 0 0 0 0 0.00 0.00 63,982.80
0 0.0 0 0 0 0 0.00 0.00 124,110.00
0 0.0 0 0 0 0 0.00 0.00 166,479.60
0 0.0 0 0 0 0 0.00 0.00 126,000.00
0 0.0 0 0 0 0 0.00 0.00 96,600.00
0 0.0 0 0 0 0 0.00 0.00 96,600.00
4,000.00 4000 0.0 4000 3000 0 0 4,000.00 0.35 1,155,000.00
5000 0.0 0 4000 0 0 5,000.00 0.24 2,100,000.00
6000 3000.0 0 6000 0 0 4,500.00 0.11 4,200,000.00
7000 3000.0 0 14000 0 0 5,000.00 0.09 5,775,000.00
3,000.00 25000 3500.0 3000 0 0 4250 8,000.00 152.38 8,000.00
15000 3000.0 0 9000 0 0 9,000.00 97.40 9,240.00
20000 4000.0 0 15000 0 0 12,000.00 76.70 15,645.00
35000 0.0 0 0 0 0 35,000.00 1.66 2,113,125.00
40000 0.0 0 0 0 0 40,000.00 0.54 7,350,000.00
0 0.0 0 0 0 0 0.00 0.00 9,450,000.00
0 0.0 0 0 0 0 0.00 0.00 13,125,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 38,850.00
125,000.00 0 0.0 125000 0 0 0 125,000.00 180.38 125,000.00
175,000.00 0 0.0 175000 0 0 0 175,000.00 155.76 175,000.00
0 0.0 0 0 0 0 0.00 0.00 131,250.00
0 0.0 0 0 0 0 0.00 0.00 69,300.00
0 0.0 0 0 0 0 0.00 0.00 112,350.00
0 0.0 0 0 0 0 0.00 0.00 131,250.00
25,000.00 15,000.00 17,500.00 0 0.0 25000 16666.6666666667 16250 0 19,166.67 43.46 44,100.00
0 0.0 0 0 0 0 0.00 0.00 131,250.00
0 0.0 0 0 0 0 0.00 0.00 76,230.00
22,000.00 6,000.00 0 28000.0 14000 22833.3333333333 0 0 18,666.67 28.35 65,835.00
32,000.00 12,000.00 20,000.00 8,000.00 25,000.00 50,000.00 35,000.00 60,000.00 25,000.00 42000 35769.2 27375 22416.6666666667 42500 21800 31,724.14 48.19 65,835.00
43,500.00 20,000.00 50,000.00 55,000.00 50,000.00 80,000.00 30,000.00 50000 44000.0 43700 25600 55000 17666.6666666667 38,740.00 54.34 71,295.00
27,500.00 300,000.00 4,000.00 15000 42000.0 110500 15000 0 0 77,700.00 272.70 77,700.00
34,500.00 4,000.00 20000 0.0 19250 9250 0 0 19,500.00 64.24 30,354.55
4,500.00 4,000.00 4000 0.0 0 2875 4250 0 4,166.67 82.14 5,072.55
0 0.0 0 0 0 0 0.00 0.00 52.50
0 0.0 0 0 0 0 0.00 0.00 52,500.00
0 0.0 0 0 0 0 0.00 0.00 1,050.00
0 0.0 0 0 0 0 0.00 0.00 26,250.00
0 0.0 0 0 0 0 0.00 0.00 8,000.00
0 0.0 0 0 0 0 0.00 0.00 10,857.00
0 0.0 0 0 0 0 0.00 0.00 10,762.50
0 0.0 0 0 0 0 0.00 0.00 11,025.00
0 0.0 0 0 0 0 0.00 0.00 45,990.00
0 0.0 0 0 0 0 0.00 0.00 41,790.00
0 0.0 0 0 0 0 0.00 0.00 70,350.00
0 0.0 0 0 0 0 0.00 0.00 35,490.00
0 0.0 0 0 0 0 0.00 0.00 31,762.50
0 0.0 0 0 0 0 0.00 0.00 63,000.00
0 0.0 0 0 0 0 0.00 0.00 15,750.00
0 0.0 0 0 0 0 0.00 0.00 10,395.00
0 0.0 0 0 0 0 0.00 0.00 4,830.00
0 0.0 0 0 0 0 0.00 0.00 4,200.00
0 0.0 0 0 0 0 0.00 0.00 31,600.00
0 0.0 0 0 0 0 0.00 0.00 1,039,500.00
0 0.0 0 0 0 0 0.00 0.00 87,570.00
0 0.0 0 0 0 0 0.00 0.00 12,600.00
0 0.0 0 0 0 0 0.00 0.00 50,900.00
0 24000.0 0 0 0 0 24,000.00 22.86 105,000.00
9,000.00 10,000.00 7,000.00 8,000.00 7,000.00 17,500.00 29,000.00 30000 12666.7 10071.4285714286 15333.3333333333 29000 9875 12,863.64 45.04 28,560.00
0 0.0 0 0 0 0 0.00 0.00 29,000.00
35000 10000.0 0 0 0 0 22,500.00 88.37 25,462.50
0 0.0 0 0 0 0 0.00 0.00 157,500.00
0 0.0 0 0 0 0 0.00 0.00 35,175.00
0 0.0 0 0 0 0 0.00 0.00 47,250.00
0 8000.0 0 0 0 0 8,000.00 38.10 21,000.00
13,000.00 40,000.00 8,500.00 6,000.00 8,000.00 8,000.00 45,000.00 10,000.00 50,000.00 53,000.00 8500 21062.5 16166.6666666667 35250 51500 32900 22,984.85 39.22 58,600.00
17,000.00 12,000.00 12,000.00 13,000.00 12,000.00 13,500.00 10,000.00 17,500.00 15,000.00 0 18687.5 12687.5 12500 16250 14900 16,370.97 25.38 64,500.00
0 0.0 0 0 0 0 0.00 0.00 3,675.00
0 0.0 0 0 0 12000 12,000.00 36.92 32,500.00
38,000.00 25,000.00 25,000.00 26,000.00 35,000.00 35,000.00 70,000.00 70,000.00 40000 25625.0 30571.4285714286 27666.6666666667 70000 26000 31,180.00 89.09 35,000.00
80000 0.0 0 0 0 0 80,000.00 72.56 110,250.00
65,000.00 75,000.00 78,000.00 0 70000.0 70000 76250 78000 0 72,000.00 65.31 110,250.00
50000 0.0 0 0 0 0 50,000.00 29.76 168,000.00
0 0.0 0 0 0 0 0.00 0.00 56,700.00
110,000.00 100,000.00 0 0.0 0 40000 105000 35000 81,666.67 130.06 81,666.67
25,000.00 125000 0.0 25000 185000 0 180000 110,000.00 137.66 110,000.00
85000 0.0 0 0 0 30000 57,500.00 71.96 79,905.00
0.0 0 0 0 0 0.00 0.00 44,730.00
0 0.0 0 30000 0 0 0.00 0.00 51,235.80
60,000.00 55,000.00 45,000.00 56,000.00 55,000.00 55,000.00 75,000.00 60,000.00 59,000.00 60000 53307.7 57000 60000 59500 56285.7142857143 55,548.39 52.25 106,303.05
0 88333.3 0 94333.3333333333 0 0 88,333.33 77.54 113,925.00
27,000.00 95,000.00 100,000.00 0 92600.0 74000 115000 0 82833.3333333333 87,281.25 76.61 113,925.00
0 88000.0 95000 0 0 94000 90,375.00 93.97 96,173.44
59,500.00 8,000.00 48,000.00 0 68000.0 38500 0 0 0 53,250.00 74.58 71,400.00
0 115000.0 0 90000 0 115000 115,000.00 87.62 131,250.00
0 0.0 0 170000 0 0 0.00 0.00 183,750.00
0 0.0 0 86333.3333333333 0 0 0.00 0.00 225,750.00
0 55000.0 0 0 0 55000 55,000.00 68.03 80,850.00
58,000.00 55,000.00 56,000.00 55,000.00 55,000.00 75,000.00 59,000.00 60000 55437.5 58428.5714285714 60000 59000 55800 56,840.91 52.56 108,150.00
0 50000.0 0 28000 0 30000 40,000.00 77.75 51,450.00
0 0.0 0 42250 0 60000 60,000.00 129.21 60,000.00
40000 0.0 0 42000 0 0 40,000.00 90.70 44,100.00
0 0.0 0 0 0 0 0.00 0.00 17,850.00
0.00 0.00 20,700.00
38,500.00 42000 0.0 0 42000 38500 45000 41,833.33 55.34 75,600.00
0 0.0 0 45562.5 0 0 0.00 0.00 78,750.00
0 0.0 0 43500 0 0 0.00 0.00 66,675.00
0 0.0 0 0 0 0 0.00 0.00 61,320.00
5,500.00 4,000.00 10,000.00 7,500.00 3,500.00 8,000.00 10000 5928.6 6500 4964.28571428571 6333.33333333333 7750 6,722.22 12.91 52,080.00
42,500.00 30,000.00 20,000.00 50,000.00 50,000.00 10,000.00 8,500.00 8,000.00 10000 49318.2 33750 25714.2857142857 8250 42500 38,931.82 71.17 54,705.00
30,000.00 50,000.00 10,000.00 8,500.00 8,000.00 0 55000.0 30000 27115.3846153846 8250 40000 36,650.00 59.36 61,740.00
0 0.0 0 0 0 0 0.00 0.00 110,250.00
45,000.00 72,000.00 41,000.00 56,000.00 0 0.0 45000 0 56333.3333333333 37000 50,200.00 96.54 52,000.00
0 0.0 0 0 0 0 0.00 0.00 68,250.00
27,500.00 10,000.00 5000 18000.0 18750 0 0 0 16,083.33 55.70 28,875.00
5,000.00 4,000.00 20,000.00 17,500.00 20,000.00 30,000.00 19,000.00 20,000.00 25000 17227.3 13750 19750 23000 15000 16,888.89 53.62 31,500.00
0 7500.0 0 0 0 0 7,500.00 47.15 15,907.50
0 15000.0 0 0 0 0 15,000.00 94.30 15,907.50
0 0.0 0 0 0 0 0.00 0.00 383,250.00
0 0.0 0 0 0 0 0.00 0.00 1,260.00
0 0.0 0 0 0 0 0.00 0.00 680,700.00
0 0.0 0 0 0 0 0.00 0.00 15,907.50
0 0.0 0 0 0 0 0.00 0.00 1,223,209.95
0 0.0 0 0 0 0 0.00 0.00 108,911.88
0 0.0 0 0 0 0 0.00 0.00 1,223,209.95
0 0.0 0 0 0 0 0.00 0.00 1,160,884.50
0 0.0 0 0 0 0 0.00 0.00 1,223,209.95
0 0.0 0 0 0 0 0.00 0.00 1,099,199.79
0 0.0 0 0 0 0 0.00 0.00 1,223,209.95
0 0.0 0 0 0 0 0.00 0.00 1,280,107.83
0 0.0 0 0 0 0 0.00 0.00 1,092,123.70
0 0.0 0 0 0 0 0.00 0.00 1,160,884.50
0 0.0 0 0 0 0 0.00 0.00 1,454,250.00
0 0.0 0 0 0 0 0.00 0.00 1,307,250.00
0 0.0 0 0 0 0 0.00 0.00 1,367,402.20
Kel. Oro-Oro
Kel. Gading Asri
Oro-oro Dowo UD. Bandung Dowo Kel. Oro-Oro Samaan Sikoharjo Toko Kelayatan (UD. Toko Besi dan UD. Barokah Lintas Alam Toko Restu Kedung [B] : HA RGA DA SAR
Toko Fauida (New Tunggal UD. Sentosa Listrik UD. Kuat Jaya UD Horas Jaya Dinoyo 1 Lowokwaru Blimbing Klojen Sukun Dinoyo [A] : RATA-RATA HARGA SURVEY % SELISIH HARGA 2018
(Lestari Jawa) Cipta Abadi (Langgeng Dowo (Bedak) (Rakha) Subur KKA Jaya) Kramik Lie Jaya Mahameru Jaya Kandang PERHI TUNGAN 2019
Jaya)
Jaya)
0 0.0 0 0 0 0 0.00 0.00 4,263,127.25
0 0.0 0 0 0 0 0.00 0.00 598,500.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 108,911.88
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 768,600.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 1,185,765.00
0 0.0 0 0 0 0 0.00 0.00 1,203,300.00
0 0.0 0 0 0 0 0.00 0.00 321,300.00
0 0.0 0 0 0 0 0.00 0.00 359,100.00
0 0.0 0 0 0 0 0.00 0.00 4,830,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 1,312,500.00
0 0.0 0 0 0 0 0.00 0.00 1,680.00
0 0.0 0 0 0 0 0.00 0.00 265,965.00
0 0.0 0 0 0 0 0.00 0.00 265,965.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 28,560.00
0 0.0 0 0 0 0 0.00 0.00 28,560.00
0 0.0 0 0 0 0 0.00 0.00 11,025.00
0 0.0 0 0 0 0 0.00 0.00 181,125.00
0 0.0 0 0 0 0 0.00 0.00 181,125.00
0 0.0 0 0 0 0 0.00 0.00 199,461.72
0 0.0 0 0 0 0 0.00 0.00 232,035.45
0 0.0 0 0 0 0 0.00 0.00 199,461.72
0 0.0 0 0 0 0 0.00 0.00 206,036.83
0 0.0 0 0 0 0 0.00 0.00 206,036.83
0 0.0 0 0 0 0 0.00 0.00 198,146.70
0 0.0 0 0 0 0 0.00 0.00 206,036.83
0 0.0 0 0 0 0 0.00 0.00 201,653.42
0 0.0 0 0 0 0 0.00 0.00 198,146.70
0 0.0 0 0 0 0 0.00 0.00 329,490.00
0 0.0 0 0 0 0 0.00 0.00 301,245.00
0 0.0 0 0 0 0 0.00 0.00 301,350.00
0 0.0 0 0 0 0 0.00 0.00 234,211.66
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 200,848.16
0 0.0 0 0 0 0 0.00 0.00 292,897.43
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 26,250.00
0 0.0 0 0 0 0 0.00 0.00 183,593.11
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 7,350.00
0 0.0 0 0 0 0 0.00 0.00 11,550.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 71,400.00
0 0.0 0 0 0 0 0.00 0.00 71,400.00
0 0.0 0 0 0 0 0.00 0.00 21,000.00
0 0.0 0 0 0 0 0.00 0.00 40,425.00
0 0.0 0 0 0 0 0.00 0.00 31,500.00
0 0.0 0 0 0 0 0.00 0.00 5,250.00
0 0.0 0 0 0 0 0.00 0.00 5,250.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 1,368,675.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 26,250.00
0 0.0 0 0 0 0 0.00 0.00 26,250.00
0 0.0 0 0 0 0 0.00 0.00 47,250.00
0 0.0 0 0 0 0 0.00 0.00 52,500.00
0 0.0 0 0 0 0 0.00 0.00 78,750.00
0 0.0 0 0 0 0 0.00 0.00 57,750.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
4,000.00 6,000.00 0 0.0 0 0 5000 0 5,000.00 43.29 11,550.00
0 0.0 0 0 0 0 0.00 0.00 52,605.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 63,000.00
5,000.00 0 0.0 5000 0 0 0 5,000.00 19.05 26,250.00
3,000.00 7,000.00 3,500.00 7,500.00 4,500.00 4,500.00 3,500.00 4,000.00 4,000.00 10000 22600.0 5785.71428571429 14600 3833.33333333333 55000 19,247.06 93.73 20,534.50
7,000.00 6,500.00 0 6500.0 6750 0 0 0 6,583.33 25.08 26,250.00
0 13000.0 0 0 0 0 13,000.00 18.76 69,300.00
0 0.0 0 0 0 0 0.00 0.00 21,735.00
12,500.00 8,000.00 0 0.0 12500 0 8000 0 10,250.00 78.10 13,125.00
13,500.00 12,000.00 5,000.00 12000 0.0 12750 0 5000 0 10,625.00 72.28 14,700.00
0 0.0 0 0 0 0 0.00 0.00 9,500.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
13,000.00 45,000.00 70,000.00 73000 0.0 42666.6666666667 57000 0 0 50,250.00 68.37 73,500.00
25,000.00 17,000.00 20,000.00 9,000.00 4,500.00 3500 17750.0 15083.3333333333 16272.7272727273 0 20000 15,416.67 27.97 55,125.00
20,000.00 11,000.00 16,000.00 16,500.00 7000 15692.3 15500 18045.4545454545 16500 14400 15,062.50 33.83 44,520.00
10,000.00 14,000.00 15,000.00 13500 13909.1 13000 15318.1818181818 15000 15500 14,250.00 27.25 52,290.00
13,500.00 20,000.00 17,000.00 17,000.00 13000 18181.8 17166.6666666667 18181.8181818182 17000 17916.6666666667 17,652.17 30.62 57,645.00
4,000.00 5,500.00 5500 19402.5 4750 0 0 0 13,230.00 45.49 29,085.00
4,000.00 7,000.00 5500 35000.0 5500 0 0 16000 13,916.67 28.93 48,100.00
81,000.00 11,000.00 0 90000.0 46000 0 0 40000 52,400.00 52.19 100,400.00
93,000.00 13,000.00 0 0.0 53000 29000 0 0 53,000.00 26.11 202,965.00
2,600.00 28,000.00 27500 25000.0 15300 33333.3333333333 0 0 20,775.00 42.75 48,600.00
28,500.00 31,000.00 30000 25000.0 29750 0 0 0 28,625.00 57.95 49,400.00
33,000.00 3,700.00 36000 25000.0 18350 0 0 0 24,425.00 43.77 55,800.00
38,000.00 39,000.00 37500 25000.0 38500 0 0 25000 32,900.00 20.89 157,500.00
41,000.00 46,000.00 45000 0.0 43500 0 0 0 44,000.00 62.95 69,900.00
16500 30250.0 0 0 0 15500 24,071.43 22.88 105,210.00
0 19750.0 0 0 0 18000 19,166.67 12.43 154,245.00
0 50000.0 0 0 0 0 50,000.00 23.75 210,525.00
800.00 700.00 3,000.00 2,500.00 1000 0.0 750 1833.33333333333 2750 0 1,600.00 64.00 2,500.00
14,000.00 67,000.00 2000 0.0 40500 180 0 0 27,666.67 3,136.81 27,666.67
2,500.00 6,000.00 3,510.00 3,500.00 2000 550.0 4250 0 3505 150 2,345.00 536.00 2,345.00
47,500.00 0 0.0 47500 0 0 0 47,500.00 180.95 47,500.00
0 0.0 0 0 0 0 0.00 0.00 11,025.00
0 0.0 0 4200 0 0 0.00 0.00 17,325.00
0 0.0 0 0 0 0 0.00 0.00 242,865.00
0 0.0 0 0 0 0 0.00 0.00 66,150.00
0 0.0 0 0 0 0 0.00 0.00 21,000.00
0 0.0 0 0 0 0 0.00 0.00 7,700.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 25,410.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 17,325.00
0 0.0 0 0 0 0 0.00 0.00 40,215.00
0 0.0 0 0 0 0 0.00 0.00 284,865.00
0 0.0 0 0 0 0 0.00 0.00 350,595.00
0 0.0 0 0 0 0 0.00 0.00 583,275.00
0 0.0 0 0 0 0 0.00 0.00 10,237.50
0 0.0 0 0 0 0 0.00 0.00 10,237.50
0 0.0 0 0 0 0 0.00 0.00 26,250.00
0 0.0 0 0 0 0 0.00 0.00 26,250.00
0 0.0 0 0 0 0 0.00 0.00 9,240.00
0 0.0 0 0 0 0 0.00 0.00 5,250.00
0 0.0 0 0 0 0 0.00 0.00 16,695.00
0 0.0 0 0 0 0 0.00 0.00 8,347.50
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 157,290.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 265,125.00
0 0.0 0 0 0 0 0.00 0.00 265,125.00
0 0.0 0 0 0 0 0.00 0.00 12,915.00
0 0.0 0 0 0 0 0.00 0.00 36,750.00
0 0.0 0 0 0 0 0.00 0.00 1,837.50
0 0.0 0 0 0 0 0.00 0.00 175,035.00
20,000.00 30,000.00 17,000.00 0 0.0 0 0 22333.3333333333 0 22,333.33 60.20 37,100.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 28100 0 0 0.00 0.00 93,100.00
0 0.0 0 0 0 0 0.00 0.00 106,444.80
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 65,500.00
0 0.0 0 0 0 0 0.00 0.00 93,450.00
0 0.0 0 0 0 0 0.00 0.00 303,164.81
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 105,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 52,500.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 226,373.70
0 0.0 0 0 0 0 0.00 0.00 301,168.35
0 0.0 0 0 0 0 0.00 0.00 257,250.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 262,500.00
0 0.0 0 0 0 0 0.00 0.00 535,500.00
0 0.0 0 0 0 0 0.00 0.00 630,000.00
0 0.0 0 0 0 0 0.00 0.00 735,000.00
0 0.0 0 0 0 0 0.00 0.00 1,645,875.00
0 0.0 0 0 0 0 0.00 0.00 1,871,100.00
0 0.0 0 0 0 0 0.00 0.00 444,675.00
0 0.0 0 0 0 0 0.00 0.00 69,300.00
0 0.0 0 0 0 0 0.00 0.00 73,300.00
0 0.0 0 0 0 0 0.00 0.00 74,300.00
0 0.0 0 0 0 0 0.00 0.00 1,836,450.00
0 0.0 0 0 0 0 0.00 0.00 381,150.00
0 0.0 0 0 0 0 0.00 0.00 928,620.00
0 0.0 0 0 0 0 0.00 0.00 103,950.00
0 0.0 0 0 0 0 0.00 0.00 71,400.00
0 0.0 0 0 0 0 0.00 0.00 635,250.00
0 0.0 0 0 0 0 0.00 0.00 360,360.00
0 0.0 0 0 0 0 0.00 0.00 184,800.00
0 0.0 0 0 0 0 0.00 0.00 14,910.00
0 0.0 0 0 0 0 0.00 0.00 55,125.00
0 0.0 0 0 0 0 0.00 0.00 26,565.00
0 0.0 0 0 0 0 0.00 0.00 26,565.00
0 0.0 0 0 0 0 0.00 0.00 630,000.00
0 0.0 0 0 0 0 0.00 0.00 25,777.50
0 0.0 0 0 0 0 0.00 0.00 2,625,000.00
Kel. Oro-Oro
Kel. Gading Asri
Oro-oro Dowo UD. Bandung Dowo Kel. Oro-Oro Samaan Sikoharjo Toko Kelayatan (UD. Toko Besi dan UD. Barokah Lintas Alam Toko Restu Kedung [B] : HA RGA DA SAR
Toko Fauida (New Tunggal UD. Sentosa Listrik UD. Kuat Jaya UD Horas Jaya Dinoyo 1 Lowokwaru Blimbing Klojen Sukun Dinoyo [A] : RATA-RATA HARGA SURVEY % SELISIH HARGA 2018
(Lestari Jawa) Cipta Abadi (Langgeng Dowo (Bedak) (Rakha) Subur KKA Jaya) Kramik Lie Jaya Mahameru Jaya Kandang PERHI TUNGAN 2019
Jaya)
Jaya)
0 0.0 0 0 0 0 0.00 0.00 441,420.00
0 0.0 0 0 0 0 0.00 0.00 202,860.00
0 0.0 0 0 0 0 0.00 0.00 267,960.00
0 0.0 0 0 0 0 0.00 0.00 369,915.00
0 0.0 0 0 0 0 0.00 0.00 181,440.00
0 0.0 0 0 0 0 0.00 0.00 247,380.00
0 0.0 0 0 0 0 0.00 0.00 307,860.00
0 0.0 0 0 0 0 0.00 0.00 88,620.00
0 0.0 0 0 0 0 0.00 0.00 109,095.00
0 0.0 0 0 0 0 0.00 0.00 157,710.00
0 0.0 0 0 0 0 0.00 0.00 220,080.00
0 0.0 0 0 0 0 0.00 0.00 74,550.00
0 0.0 0 0 0 0 0.00 0.00 93,030.00
0 0.0 0 0 0 0 0.00 0.00 103,110.00
0 0.0 0 0 0 0 0.00 0.00 145,005.00
0 0.0 0 0 0 0 0.00 0.00 95,025.00
0 0.0 0 0 0 0 0.00 0.00 154,665.00
0 0.0 0 0 0 0 0.00 0.00 188,895.00
0 0.0 0 0 0 0 0.00 0.00 51,450.00
5,000.00 0 0.0 0 0 5000 0 5,000.00 21.84 22,890.00
6,000.00 0 0.0 0 8055.55555555556 6000 0 6,000.00 16.47 36,435.00
9,000.00 0 0.0 0 10277.7777777778 9000 0 9,000.00 15.12 59,535.00
0 0.0 0 0 0 0 0.00 0.00 73,920.00
0 0.0 0 11777.7777777778 0 0 0.00 0.00 132,825.00
0 0.0 0 0 0 0 0.00 0.00 1,175,160.00
0 0.0 0 0 0 0 0.00 0.00 1,856,295.00
0 0.0 0 0 0 0 0.00 0.00 470,085.00
0 0.0 0 0 0 0 0.00 0.00 1,588,755.00
0 0.0 0 0 0 0 0.00 0.00 2,142,525.00
0 0.0 0 0 0 0 0.00 0.00 2,458,995.00
0 0.0 0 0 0 0 0.00 0.00 190,575.00
0 0.0 0 0 0 0 0.00 0.00 177,870.00
0 0.0 0 0 0 0 0.00 0.00 29,505.00
0 0.0 0 3538.46153846154 0 30000 30,000.00 453.51 30,000.00
0 0.0 0 4500 0 0 0.00 0.00 41,055.00
0 0.0 0 6500 0 0 0.00 0.00 120,645.00
0 0.0 0 0 0 0 0.00 0.00 177,345.00
0 0.0 0 4250 0 0 0.00 0.00 8,715.00
0 0.0 0 4272.72727272727 0 0 0.00 0.00 6,405.00
0 0.0 0 4500 0 0 0.00 0.00 52,605.00
0 0.0 0 0 0 0 0.00 0.00 138,600.00
0 0.0 0 0 0 0 0.00 0.00 178,395.00
0 0.0 0 3500 0 0 0.00 0.00 29,190.00
0 0.0 0 5000 0 0 0.00 0.00 76,440.00
0 0.0 0 0 0 0 0.00 0.00 120,120.00
0 0.0 0 0 0 0 0.00 0.00 53,340.00
0 0.0 0 0 0 0 0.00 0.00 138,390.00
0 0.0 0 0 0 0 0.00 0.00 178,395.00
0 0.0 0 0 0 0 0.00 0.00 155,190.00
0 0.0 0 0 0 0 0.00 0.00 199,710.00
0 0.0 0 0 0 0 0.00 0.00 350,595.00
0 0.0 0 0 0 0 0.00 0.00 11,550,000.00
0 0.0 0 0 0 0 0.00 0.00 433,125.00
0 0.0 0 0 0 0 0.00 0.00 63,525.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 420,000.00
0 12000.0 0 0 0 0 12,000.00 0.10 12,600,000.00
0 0.0 0 0 0 0 0.00 0.00 15,750,000.00
0 0.0 0 0 0 0 0.00 0.00 21,000.00
0 0.0 0 0 0 0 0.00 0.00 5,250.00
0 0.0 0 0 0 0 0.00 0.00 262,500.00
0 0.0 0 0 0 0 0.00 0.00 22,680.00
0 0.0 0 0 0 0 0.00 0.00 22,680.00
0 0.0 0 0 0 0 0.00 0.00 267,750.00
0 0.0 0 0 0 0 0.00 0.00 577,500.00
0.00 0.00 970,000.00
0.00 0.00 630,000.00
0 0.0 0 0 0 0 0.00 0.00 4,777,500.00
0 0.0 0 0 0 0 0.00 0.00 140,000.00
0 0.0 0 0 0 0 0.00 0.00 8,100.00
0 0.0 0 0 0 0 0.00 0.00 8,100.00
104,000.00 156,000.00 0 0.0 104000 0 156000 0 130,000.00 1,428.57 130,000.00
168,000.00 0 0.0 0 0 168000 0 168,000.00 1,750.00 168,000.00
0 0.0 0 0 0 0 0.00 0.00 136,000.00
0 0.0 0 0 0 0 0.00 0.00 190,000.00
0 0.0 0 0 0 0 0.00 0.00 34,000.00
0 0.0 0 0 0 0 0.00 0.00 130,000.00
0 0.0 0 0 0 0 0.00 0.00 8,400.00
0 0.0 0 0 0 0 0.00 0.00 84,000.00
0 0.0 0 0 0 0 0.00 0.00 150,000.00
0 0.0 0 0 0 0 0.00 0.00 128,275.86
0 0.0 0 0 0 0 0.00 0.00 394,000.00
0 0.0 0 0 0 0 0.00 0.00 860,000.00
0 0.0 0 0 0 0 0.00 0.00 31,000.00
0 0.0 0 0 0 0 0.00 0.00 945,000.00
0 0.0 0 0 0 0 0.00 0.00 145,000.00
0 0.0 0 0 0 0 0.00 0.00 780,000.00
0 0.0 0 0 0 0 0.00 0.00 24,500.00
0 0.0 0 0 0 0 0.00 0.00 108,000.00
0 0.0 0 0 0 0 0.00 0.00 332,000.00
0 0.0 0 0 0 0 0.00 0.00 9,000.00
0 0.0 0 0 0 0 0.00 0.00 9,500.00
0 0.0 0 0 0 0 0.00 0.00 1,500,000.00
0 0.0 0 0 0 0 0.00 0.00 491,910.00
0 0.0 0 0 0 0 0.00 0.00 231,850.00
0 0.0 0 0 0 0 0.00 0.00 142,500.00
0 0.0 0 0 0 0 0.00 0.00 192,230.00
0 0.0 0 0 0 0 0.00 0.00 90,000.00
0 0.0 0 0 0 0 0.00 0.00 341,000.00
0 0.0 0 0 0 0 0.00 0.00 225,000.00
0 0.0 0 0 0 0 0.00 0.00 12,500.00
0 0.0 0 0 0 0 0.00 0.00 225,000.00
0 0.0 0 0 0 0 0.00 0.00 185,000.00
0 0.0 0 0 0 0 0.00 0.00 265,000.00
0 0.0 0 0 0 0 0.00 0.00 0.00
0 0.0 0 0 0 0 0.00 0.00 500,000.00
0 0.0 0 0 0 0 0.00 0.00 140,000.00
0 0.0 0 0 0 0 0.00 0.00 30,000.00
0 0.0 0 0 0 0 0.00 0.00 37,000.00
0 0.0 0 0 0 0 0.00 0.00 21,500.00
0 0.0 0 0 0 0 0.00 0.00 33,000.00
0 0.0 0 0 0 0 0.00 0.00 110,000.00
0 0.0 0 0 0 0 0.00 0.00 72,000.00
0 0.0 0 0 0 0 0.00 0.00 21,875.00
0 0.0 0 0 0 0 0.00 0.00 54,000.00
0 0.0 0 0 0 0 0.00 0.00 360,000.00
0 0.0 0 0 0 0 0.00 0.00 687,900.00
0 0.0 0 0 0 0 0.00 0.00 1,129,500.00
0 0.0 0 0 0 0 0.00 0.00 1,754,100.00
0 0.0 0 0 0 0 0.00 0.00 2,737,800.00
0 0.0 0 0 0 0 0.00 0.00 4,348,800.00
0 0.0 0 0 0 0 0.00 0.00 6,960,300.00
0 0.0 0 0 0 0 0.00 0.00 8,801,100.00
0 0.0 0 0 0 0 0.00 0.00 10,856,100.00
0 0.0 0 0 0 0 0.00 0.00 51,313,800.00
0 0.0 0 0 0 0 0.00 0.00 65,131,200.00
0 0.0 0 0 0 0 0.00 0.00 80,226,000.00
0 0.0 0 0 0 0 0.00 0.00 95,516,400.00
0 0.0 0 0 0 0 0.00 0.00 110,806,800.00
0 0.0 0 0 0 0 0.00 0.00 26,661,900.00
0 0.0 0 0 0 0 0.00 0.00 54,000.00
0 0.0 0 0 0 0 0.00 0.00 90,750.00
0 0.0 0 0 0 0 0.00 0.00 114,650.00
0 0.0 0 0 0 0 0.00 0.00 236,700.00
0 0.0 0 0 0 0 0.00 0.00 367,750.00
0 0.0 0 0 0 0 0.00 0.00 456,300.00
0 0.0 0 0 0 0 0.00 0.00 724,800.00
0 0.0 0 0 0 0 0.00 0.00 1,160,050.00
0 0.0 0 0 0 0 0.00 0.00 1,466,850.00
0 0.0 0 0 0 0 0.00 0.00 1,809,350.00
0 0.0 0 0 0 0 0.00 1.00 4,443,650.00
0 0.0 0 0 0 0 0.00 1.00 8,552,300.00
0 0.0 0 0 0 0 0.00 1.00 10,855,200.00
0 0.0 0 0 0 0 0.00 1.00 13,371,000.00
0 0.0 0 0 0 0 0.00 1.00 15,919,400.00
0 0.0 0 0 0 0 0.00 1.00 18,467,800.00
OLAHAN HARGA SATUAN ALAT
OLAHAN
REKAP ALAT
A B C D D E
E.01 ASPHALT MIXING PLANT (AMP) Jam 10,801,060 10,909,070 10,909,070 11,658,100.00 93.58 9,973,074 DIBAWAH SSH 18
E.01x ASPHALT MIXING PLANT Unit 3,000,000,000 0.00
E.02 ASPHALT FINISHER Jam 600,994 607,004 607,004 821,000.00 73.93 687,016 DIBAWAH SSH 18
E.02x ASPHALT FINISHER Unit 123,567,899 0.00
E.03 ASPHALT SPRAYER Jam 67,303 67,976 67,976 112,000.00 60.69 78,830 DIBAWAH SSH 18
E.04 BULLDOZER 100-150 HP Jam 567,471 573,146 573,146 926,500.00 61.86 1,048,302 DIBAWAH SSH 18
E.04x BULLDOZER 100-150 HP Unit 56,000,000 0.00
E.05 COMPRESSOR 4000-6500 L\M Jam 277,300 280,073 277,300 277,300.00 100.00 202,101 SAMA SSH
E.05x COMPRESSOR 4000-6500 L\M Unit 42,000,000 0.00
E.05.a AIR COMPRESSOR Jam 291,165 294,077 294,077 - 0.00 -
E.06 CONCRETE MIXER 0.3-0.6 M³ Jam 232,521 234,846 234,846 - 0.00 227,127 -
E.06x CONCRETE MIXER 0.3-0.6 M132 Unit 56,000,000 0.00
E.06xx Chainsaw Buah 200,000 202,000 202,000 - 0.00 -
E.07 CRANE 10-15 TON Jam 794,950 802,900 802,900 914,100.00 87.84 575,044 DIBAWAH SSH 18
E.07x CRANE 10-15 TON Unit 280,000,000 0.00
E.07.a Crane hari 6,063,750 6,124,388 6,124,388 - 0.00 -
E.07.b Crane Kecil hari 2,205,000 2,227,050 2,227,050 - 0.00 -
E.07.c Crane Besar hari 3,307,500 3,340,575 3,340,575 - 0.00 -
E.07.e Crane 5 ton (Long arm 15 m) Sewa-hari 892,500 901,425 901,425 - 0.00 -
E.07.f Mobile crane ≤ 3 ton Hari 777,630 785,406 785,406 - 0.00 -
E.07.fx Mobile crane ≤ 3 ton Unit 2,858,244,000 0.00
E.07.g Sewa Crane Unit-hari 777,630 785,406 785,406 - 0.00 -
E.08 DUMP TRUCK 3-4 M³, 10 Ton Jam 387,861 391,740 391,740 - 0.00 366,823 -
E.08x DUMP TRUCK 3-4 M³, 10 Ton Unit 469,000,000 0.00
E.08.a Sewa Dump Truk (Dump Truck 3.5 Ton) hari 2,126,565 2,147,831 2,147,831 3,025,300.00 71.00 DIBAWAH SSH 18
E.09 Dump Truck 10 Ton Jam 686,484 693,349 693,349 - 0.00 678,026 -
E.09x Dump Truck 10 Ton Unit 560,000,000 0.00
E.10 EXCAVATOR 80-140 HP Jam 695,580 702,536 702,536 - 0.00 559,899 -
E.10x EXCAVATOR 80-140 HP Unit 630,000,000 0.00
E.10.a Excavator Standard Jam 262,500 265,125 265,125 - 0.00 -
E.10.b Excavator (Long arm) Jam 367,500 371,175 371,175 - 0.00 -
E.10.d Excavator 1 (Long Arm) + Ponton 1 Jam 682,500 689,325 689,325 - 0.00 -
E.10.e Sewa excavator type 225 kapasitas 0,5 -1,0 m³ Hari 682,290 689,113 689,113 - 0.00 -
E.10.f Sewa Excavator (Excavator 80-140 HP) hari 3,941,070 3,980,481 3,980,481 - 0.00 -
E.100 Alat Penyambung Tiang Pancang hari 551,250 556,763 556,763 - 0.00 -
E.100.a Temporary cassing CID 12" Meter 262,500 265,125 265,125 - 0.00 -
E.101 Sewa lahan ha-bulan 787,500 795,375 795,375 - 0.00 -
OLAHAN
REKAP ALAT
A B C D D E
E.61 PILE HAMMER 2,5 TON Jam 153,922 155,461 155,461 - 0.00 - -
E.61x PILE HAMMER 2,5 TON Unit 571,648,800 0.00
E.62 STRESSING JACK Jam 109,778 110,876 110,876 - 0.00 - -
E.62.a STRESSING JACK Sewa-hari 2,520,000 2,545,200 2,545,200 - 0.00 -
E.62.ax STRESSING JACK Unit 17,149,464 0.00
E.62x Sewa Alat Cuting laser Hari 65,753 66,411 65,753 0.00 -
E.63 WELDING MACHINE, 300 A Jam 99,015 100,005 100,005 - 0.00 - -
E.63x WELDING MACHINE, 300 A Unit 85,747,320 0.00
E.64.a Ponton 2 Jam 157,500 159,075 159,075 - 0.00 -
E.64.b Ponton Sewa-hari 1,260,000 1,272,600 1,272,600 - 0.00 -
E.65 Tongkang Jam 262,500 265,125 265,125 - 0.00 -
E.65.a Tongkang (besar) 2000 ton Jam 525,000 530,250 530,250 - 0.00 -
E.66 Perahu Jam 105,000 106,050 106,050 - 0.00 -
E.66.a Rakit Sewa-hari 840,000 848,400 848,400 - 0.00 -
E.68.a Sewa Pompa Submersible 3 m³/h Hari 105,000 106,050 106,050 - 0.00 -
E.68.b Pompa air diesel 5 KW Sewa-hari 1,370,200 1,383,902 1,370,200 1,370,200.00 100.00 SAMA SSH
E.68.c Pompa air diesel 10 KW Sewa-hari 1,510,635 1,525,741 1,525,741 - 0.00 -
E.68.d Pompa air diesel 20 KW Unit 2,100,000 2,121,000 2,121,000 - 0.00 -
E.68.e Pompa lumpur diesel 2,5 KW; 3" Sewa-hari 2,100,000 2,121,000 2,121,000 - 0.00 -
E.68.f Pompa sedot pasir diesel 5 KW; 3" Sewa-hari 2,625,000 2,651,250 2,651,250 - 0.00 -
E.68.g Pompa dan Conveyor beton Sewa-hari 3,150,000 3,181,500 3,181,500 - 0.00 -
E.68.h Pompa Air Diesel 5 kW bh 4,961,250 5,010,863 5,010,863 - 0.00 -
E.68.i Pompa Air Diesel 10 kW bh 12,127,500 12,248,775 12,248,775 - 0.00 -
E.68.j Pompa Air Diesel 20 kW bh 17,088,750 17,259,638 17,259,638 - 0.00 -
E.69 Alat pancang + Hammer 0,5 ton Sewa-hari 315,000 318,150 318,150 357,800.00 88.92 DIBAWAH SSH 18
E.69.a Alat pancang + Hammer 1,0 ton Sewa-hari 420,000 424,200 424,200 - 0.00 -
E.69.b Alat pancang + Hammer 2 ton Sewa-hari 1,102,500 1,113,525 1,113,525 - 0.00 -
E.69.c Alat pancang + Hammer 2 ton Jam 157,500 159,075 39,572 0.00 -
E.69.d Alat Pancang Tenaga Uap/Diesel 8 Ton Sewa-hari 1,785,000 1,802,850 1,802,850 - 0.00 -
E.69.e Tiang Pancang Beton Bertulang 40 x 40 cm m 400,000 404,000 404,000 - 0.00 -
E.69.f Alat Pancang Kompressor Udara 8 Ton hari 1,890,000 1,908,900 1,908,900 - 0.00 -
E.70 Peralatan potong pipa T1/manual (gergaji)/saw Hari 210,000 212,100 212,100 - 0.00 -
E.70.a Peralatan potong pipa T2/mekanik/cilinder saw Hari 210,000 212,100 212,100 - 0.00 -
E.71 Boat, Speedboat, motor 10 HP Sewa-hari 787,500 795,375 795,375 - 0.00 -
E.73 Drilling rig + perlengkapan Jam 409,500 413,595 413,595 - 0.00 -
E.73.a Mesin Bor (Drilling Rig) Jam 409,500 413,595 413,595 3,143,600.00 13.16 DIBAWAH SSH 18
E.74 Sewa pipe Support Buah-hari 15,750 15,908 15,908 - 0.00 -
E.75 Sewa Scaffolding Unit-hari 31,500 31,815 31,815 - 0.00 -
E.76 Sewa Alat Jam 63,000 63,630 63,630 - 0.00 -
OLAHAN
REKAP ALAT
A B C D D E
E.77 Sewa Tripot/Tackel & handle crane 2 T Hari 3,340,050 3,373,451 3,373,451 - 0.00 -
E.77.a Trackle / Tripod tinggi 4-5 cm Sewa-hari 551,250 556,763 556,763 - 0.00 -
E.77.b Trackle / Tripod Sewa-hari 551,250 556,763 556,763 - 0.00 -
E.77.c Trackle / Tripod tinggi 3-5 cm Sewa-hari 551,250 556,763 556,763 - 0.00 -
E.77.d Tripod tinggi 5 m Sewa-hari 551,250 556,763 556,763 - 0.00 -
E.77.e Tripod tinggi 7 m Sewa-hari 551,250 556,763 556,763 - 0.00 -
E.77.f Tripod tinggi 5 m hari 551,250 556,763 556,763 - 0.00 -
E.78 Geo listrik Sewa-hari 3,488,100 3,522,981 3,522,981 - 0.00 -
E.78.a Geo listrik jam 436,013 440,373 440,373 - 0.00 -
E.79 Lift Sewa-hari 703,500 710,535 710,535 - 0.00 -
E.80 Molen Sewa-hari 157,500 159,075 159,075 - 0.00 -
E.80.a Molen kapasitas 0,3 m3 Sewa-hari 262,500 265,125 265,125 - 0.00 -
E.80.b Molen (Concrete Mixer.350) Unit/hr 531,090 536,401 536,401 - 0.00 -
E.81 Kendaraan pengangkut Sewa-hari 262,500 265,125 265,125 - 0.00 -
E.82 Theodolith Sewa-hari 218,400 220,584 218,400 218,400.00 100.00 SAMA SSH
E.82.a Pesawat ukur/Theodolith Unit/hr 315,000 318,150 318,150 - 0.00 -
E.84 Waterpass Sewa-hari 157,500 159,075 159,075 - 0.00 -
E.85 Bor listrik Sewa-hari 99,750 100,748 100,748 - 0.00 -
E.86 Gergaji listrik Sewa-hari 96,180 97,142 97,142 - 0.00 -
E.86.a Gergaji besi Buah 82,740 83,567 83,567 - 0.00 -
E.86.b Chainshaw Jam 52,500 53,025 53,025 - 0.00 -
E.91 Sewa komputer Sewa-bulan 420,000 424,200 424,200 - 0.00 -
E.93 Pahat beton (baja keras) Buah 165,375 167,029 167,029 - 0.00 -
E.94 Linggis (baja keras) Buah 68,250 68,933 68,933 - 0.00 -
E.95 Palu / godam (baja keras) Buah 110,250 111,353 111,353 - 0.00 -
E.99 Mud Pump Jam 1,736,490 1,753,855 1,753,855 - 0.00 -
E.100 Lift hari 1,653,800 1,670,338 1,670,338 - 0.00 -
E.101 Power Broom Unit - - 98,609,418 - 0.00 -
E.102 Asphalt Liquid Mixer (kap 20000) Unit - - 500,192,700 - 0.00 -
E.103 Alat tambahan Batubara Direct Unit - - 5,716,488 - 0.00 -
E.104 Alat tambahan Gas Batubara Unit - - 6,431,049 - 0.00 -
E.105 Bar Cutter Unit - - 214,368,300 - 0.00 -
E.106 Breaker Unit - - 1,650,000,000 - 0.00 -
E.107 Pile Driver Leader, 75 Kw Unit - - 550,211,970 - 0.00 -
E.108 Stressing Machine Unit - - 2,172,265 - 0.00 -
E.109 Gerinda dan Bor beton Unit - - 535,000 - 0.00 -
E.110 Penarik kabel Unit - - 1,287,000 - 0.00 -
E.111 Alat Grouting Unit - - 122,475 - 0.00 -
E.112 Scalping Screen Unit - - 71,456,100 - 0.00 -
OLAHAN
REKAP ALAT
A B C D D E
Bina Marga
1 2 3
Kode
ISLAMIC
Jenis Pekerjaan
Harga Satuan
195,801 M2
291,167 M2
1,025,499 M2
46,320 M'
1,587,922 M2
1,746,361 M2
1,487,875 M2
1,503,753 M2
12,000 M2
336,104 M2
105,165 M2
122,524 M2
999,980 M3
499,990 M3
12,390 M2
288,275 M2
195,801 M2
270,146 M'
1,280,706 M'
850,000 M³
82,000 M2
15,000 M2
20,640 M2
83,960 M'
55,000 M3
67,500 M3
80,200 M3
73,200 M3
111,000 M3
88,500 M3
4,000 M3
24,100 M3
40,000 M3
40,000 M3
196,720 M3
301,246 M3
912,000 M3
218,000 M3
55,000 M³
348,167 M³
355,000 M³
40,231 M³
110,000 M³
303,903 M³
651,180 M3
615,680 M3
591,080 M3
573,780 M3
550,080 M3
798,575 M3
825,395 M3
1,163,662 M3
428,760 M3
1,584,672 M3
574,487 M3
699,420 M³
663,920 M³
639,320 M³
622,020 M³
598,320 M³
894,961 M³
873,635 M³
822,502 M³
677,505 M3
703,432 M3
723,566 M3
626,910 M3
747,582 M3
770,221 M3
787,661 M3
798,578 M3
817,415 M3
823,208 M3
886,038 M3
893,666 M3
988,736
1,064,653 M4
139,883 M3
194,523 M3
148,951 M'
82,530 M'
78,350 M'
380,215 Kg
196,718 Kg
212,625 Kg
204,835 M2
209,335 M2
222,835 M2
208,622 M2
189,610 M2
67,450 M2
2,441,489 M3
2,992,279 M3
4,815,095 M3
3,771,465 M3
3,380,995 M3
2,667,605 M3
3,517,245 M3
55,325 M'
1,882,209 M'
129,214 M2
136,714 M2
230,987 M2
252,383 M2
270,383 M2
271,709 M2
237,158 M2
96,568 M2
130,198 M2
100,318 M2
138,152 M2
171,400 M2
69,860 M2
178,312 M2
230,767 M2
180,400 M2
298,321 M2
176,191 M2
265,723 M2
140,478 M2
172,141 M2
454,578 M2
1,354,885 M2
1,372,772 M2
524,018 M'
671,243 M'
287,978 M'
853,436 M'
583,250 M'
778,882 M'
501,770 M'
1,354,885 M'
1,372,772 M'
524,018 M'
671,243 M'
395,918 M'
916,536 M'
734,367 M'
889,242 M'
524,040 M'
1,366,697 M'
1,372,772 M'
534,812 M'
773,934 M'
393,293 M'
916,536 M'
729,117 M'
889,242 M'
174,718 M2
134,405 M2
192,275 M2
144,438 M2
722,199 M2
475,053 M2
155,741 M2
492,610 M2
165,773 M2
236,874 M2
174,874 M2
108,874 M2
354,980 M2
134,405 M2
378,275 M2
144,438 M2
655,014 M2
205,874 M2
108,874 M2
99,874 M2
360,718 M2
235,155 M2
378,275 M2
245,188 M2
1,343,822 M2
715,999 M2
290,166 M2
235,155 M2
291,420 M2
245,188 M2
1,343,822 M2
715,999 M2
360,718 M2
235,155 M2
378,275 M2
245,188 M2
1,343,822 M2
869,449 M2
315 Kg
2,031 Kg
720 Kg
59,821 M2
74,789 M2
89,681 M2
112,188 M2
956,306 M2
135,779 M2
115,072 M2
5,740 Buah
9,280 Buah
7,510 Buah
46,460 Buah
47,760 Buah
43,015 Buah
185,211 Buah
188,000 Buah
223,217 Buah
42,372 Buah
42,372 Buah
42,372 Buah
27,848,750 M3
42,930,000 M3
41,555 Titik
5,237,785 Titik
37,070 Titik
20,478 Kg
44,441 Kg
78,749 Kg
872,400 M2
55,486 Cm
551,255 M2
3,547,000 M2
2,703,460 M2
551,145 M2
2,116,600 M2
231,760 M
1,349,323 M2
1,012,950 M2
867,291 M2
527,992 M2
163,448 M2
910,946 M2
77,420 M'
64,530 M2
179,550 M2
211,700 M2
175,883 M2
270,961 M2
26,950 M2
26,950 KG
15,520 KG
15,533 KG
16,450 UNIT
3,950 M'
75,970 M'
94,650 M'
352,604 M'
78,775 M'
100,140 M'
557,052 M'
95,445 bh
428,325 M'
745,145 M2
1,030,038 M2
301,717 M2
276,228 M2
276,228 M2
870,424 M2
1,144,360 M2
2,825,594 M2
3,227,549 M2
517,464 M2
78,009 M2
2,728,938 UNIT
3,309,489 UNIT
725,108 M2
1,274,925 UNIT
1,181,070 UNIT
2,081,027 UNIT
3,216,732 UNIT
5,468,950 UNIT
185,300 M2
585,000 M2
169,650 M2
166,200 M2
164,500 M2
168,161 M2
89,650 M2
85,270 M2
82,700 M2
81,080 M2
80,120 M2
78,400 M2
84,599 M2
78,652 M2
77,441 M2
263,020 M2
261,360 M2
695,025 M2
693,055 M2
664,835 M2
172,330 M2
523,400 M2
133,400 M2
256,800 M2
8,499,336 M2
8,371,929 M2
185,770 M2
180,150 M2
633,465 M2
629,245 M2
128,770 M2
125,980 M2
1,649,300 M2
53,704 M2
48,824 M2
46,676 M2
45,240 M2
44,384 M2
43,716 M2
43,336 M2
42,956 M2
46,980 M2
46,013 M2
46,657 M2
45,596 M2
65,332 M2
51,768 M2
60,520 M2
59,412 M2
58,488 M2
62,957 M2
26,179 M2
45,400 M2
483,495 M2
296,608 M2
36,221 M2
21,503 M2
10,235 M2
44,140 M2
27,650 M2
24,400 M2
24,400 M2
65,332 M2
18,800 M2
74,067 M2
85,453 M2
103,585 M2
90,960 M2
97,365 M2
130,185 M2
88,900 M2
127,196 M2
486,718 M2
507,036 M2
479,490 M2
705,568 M2
428,353 M2
631,897 M2
922,437 M2
42,750 M'
35,862 M'
31,905 M'
27,050 M'
33,479 M'
33,405 M'
42,304 M'
44,005 M'
73,685 M'
68,426 M'
101,973 M'
111,889 M'
63,371 M'
77,036 M'
71,459 M'
57,699 M2
940,222 M2
626,290 M2
172,902 M2
173,651 M2
145,050 M2
439,892 M2
387,213 M2
45,940 M2
72,840 M2
74,735 M2
320,640 M2
776,938 M2
199,269 M2
27,704 M2
448,669 M2
448,669 M2
158,137 M2
239,100 M2
198,740 M2
917,500 M2
1,763,565 M2
963,032 M2
1,703,239 M2
914,266 M2
50,289,565 M2
102,866 M2
241,560 M2
1,308,958 M2
160,496 M2
253,590 M2
204,433 M2
92,830 M2
192,617 M2
638,936 M2
195,629 M2
645,363 M'
479,490 M2
196,101 M2
213,670 M2
224,581 M2
213,670 M2
213,658 M2
240,959 M2
149,335 M2
149,335 M2
125,126 M'
145,325 M'
229,100 M2
330,386 M2
229,100 M2
242,040 M2
284,886 M2
234,273 M2
537,466 M2
105,690 M2
162,500 M2
165,460 M2
147,000 M2
153,600 M2
197,475 M2
404,031 M2
442,663 M2
204,900 M2
64,500 M2
53,181 M2
508,172 M2
256,832 M2
79,136 M2
46,838 M2
157,986 M2
48,909 M2
312,976 M2
33,664 M'
41,452 M2
43,484 M2
39,744 M2
36,687 M2
782,888 M2
849,273 M2
232,886 M2
297,393 M2
392,224 M2
157,629 M2
658,490 M2
474,457 M2
#N/A M2
281,857 M2
240,870 M2
240,870 M2
180,900 M2
180,900 M2
546,948 M2
468,390 M2
446,034 M2
353,446 M2
318,084 M2
1,790,439 M2
1,711,881 M2
624,996 M2
532,407 M2
497,045 M2
1,006,615 M2
914,395 M2
888,152 M2
2,510,318 M2
737,949 M2
2,839,193 M2
501,266 M2
46,681 M'
113,350 M2
195,895 M2
107,195 M2
93,727 M2
93,727 M2
107,831 M2
50,825 M2
93,647 M2
108,397 M2
107,782 M2
129,907 M2
70,907 M2
81,232 M2
84,182 M2
94,507 M2
137,282 M2
73,857 M2
75,332 M2
87,132 M2
91,557 M2
103,357 M2
771,040 M'
749,365 M'
745,752 M'
674,013 M'
674,013 M'
674,013 M'
670,894 M'
667,649 M'
99,781 M2
197,058 M2
239,377 M2
353,477 M2
168,907 M2
121,436 M2
214,682 M2
199,459 M2
62,046 M2
158,014 M2
38,901 M2
282,851 M'
125,823 M2
66,220 M2
68,395 M2
127,759 M2
127,759 M2
127,759 M2
164,214 M2
75,168 M2
84,182 M2
94,257 M2
96,700 M2
110,032 M2
124,595 M2
193,631 M2
92,200 M2
121,024 M2
199,609 M2
199,518 M2
173,268 M2
55,834 M2
131,964 M2
576,790 M2
259,005 M2
94,740 M2
26,793,605 M3
28,637,143 M3
703,440 M2
185,968 M2
1,269,465 M2
833,079 M2
1,313,205 M2
753,947 M2
798,309 M2
1,137,533 M2
776,747 M2
960,785 M2
11,201,533 M2
13,023,933 M3
12,117,589 M3
515,909 M3
735,273 M3
42,338 M2
272,179 M2
283,085 M2
291,664 M2
295,495 M2
301,498 M'
711,897 M'
404,076 M2
131,878 M2
553,132 M2
4,237,693 m³
28,637,143 m³
4,030,693 m³
4,030,693 m³
1,006,183 m²
185,968 m²
1,006,183 m²
449,250 m²
904,479 m²
651,433 m²
340,950 m²
1,726,194 m²
1,726,194 m²
485,250 m²
943,161 m²
753,947 m²
430,527 m²
992,065 m²
992,065 m²
467,127 m²
1,591,648 m²
1,137,533 m²
361,325 m²
1,003,169 m²
813,955 m²
490,535 m²
1,187,208 m²
997,993 m²
674,573 m²
25,960,000 m³
17,634,566 m³
11,034,693 m³
29,124,438 m³
20,042,146 m³
12,842,284 m³
26,877,888 m³
26,877,888 m³
26,877,888 m³
599,907 m²
515,909 m²
925,232 m²
819,271 m²
735,273 m²
329,458 m²
139,500 m²
388,735 m²
179,781 m²
406,453 m²
185,287 m²
212,734 m'
137,239 m'
219,415 m'
211,146 m'
672,415 m²
923,817 m²
543,901 m²
351,096 m²
260,538 m²
447,171 m²
19,554,851 m³
19,554,851 m³
824,974 m²
579,280 m²
1,950,306 m²
1,507,661 m²
1,507,661 m²
1,114,549 m²
930,171 m²
948,963 m²
768,569 m²
1,734,793 m²
1,319,813 m²
1,319,813 m²
951,271 m²
1,047,218 m²
344,794 m²
876,085 m²
720,751 m²
1,326,121 m²
1,326,121 m²
1,153,213 m²
972,819 m²
1,228,668 m²
1,102,310 m²
921,916 m²
486,324 m²
317,070 m²
299,196 m²
213,854 m²
213,854 m²
389,496 m²
317,070 m²
299,196 m²
213,854 m²
213,854 m²
420,272 m²
341,694 m²
322,754 m²
230,166 m²
230,166 m²
312,491 m²
253,367 m²
240,097 m²
173,675 m²
163,706 m²
319,188 m²
486,918 m²
610,287 m²
572,511 m²
442,291 m²
291,328 m1
216,632 m1
216,632 m1
138,702 m1
138,702 m1
309,303 m1
219,327 m1
219,327 m1
139,954 m1
181,756 m1
203,749 Buah
217,562 Buah
203,750 Buah
270,567 Buah
66,770 Buah
34,246 Buah
65,619 Buah
52,537 Buah
39,150 Buah
310,941 Buah
111,793 Buah
236,627 Buah
70,100 Buah
277,100 Buah
44,750 Buah
166,844 M2
155,184 M2
447,935 M2
615,665 M2
372,020 M2
851,320 M2
1,005,184 M2
2,185,005 M2
622,980 m²
385,505 m²
343,940 m²
236,800 m²
477,767 m²
50,730 buah
30,250 buah
65,500 buah
229,510 m²
329,060 m²
656,860 m²
1,048,655 m²
184,080 buah
88,700 m²
83,830 bh
89,896 bh
17,850 bh
54,823 bh
429,130 m2
112,294 m1
135,784 m1
12,655 M2
14,075 M2
14,575 M2
40,516 M2
52,562 M2
32,629 M2
73,873 M2
25,415 M2
43,875 M2
25,218 M2
18,240 M2
7,512 M2
15,519 M2
10,945 M2
145,772 M2
24,135 M2
52,477 M2
54,071 M2
35,510 M2
126,482 M2
105,838 M2
1,878,258 M2
15,905 m²
12,185 m²
47,962 m²
14,852 m²
28,762 m²
24,472 m²
89,655 m²
27,185 m²
526,900 Buah
237,500 Buah
351,500 Buah
3,781,249 Buah
667,280 Buah
3,595,300 Buah
5,745,585 Buah
69,023,670 Buah
5,527,970 Buah
5,152,019 Buah
6,579,961 Buah
536,598 Buah
547,483 Buah
35,600 Buah
337,400 Buah
508,254 Buah
620,722 Buah
97,303 M'
83,828 M'
145,057 M'
140,817 M'
261,260 M'
535,937 M'
822,874 M'
24,673 M'
30,262 M'
48,407 M'
67,461 M'
73,963 M'
108,142 M'
93,015 M'
116,423 M'
203,526 M'
166,396 M'
148,233 M'
541,970 M'
1,131,500 buah
3,132,736 buah
2,679,686 buah
63,625 buah
1,058,554 buah
5,086,058 buah
429,277 m'
575,706 m'
92,680 m'
192,831 m'
395,179 m'
541,943 m'
18,708 m'
23,203 m'
27,614 m'
38,065 m'
45,376 m'
65,224 m'
83,570 m'
112,123 m'
16,440 m'
20,328 m'
22,971 m'
27,846 m'
42,467 m'
50,595 m'
63,821 m'
76,129 m'
106,045 buah
50,899 buah
470,520 m²
112,294 m'
135,784 m'
924,587 m'
1,514,755 m'
1,928,058 m'
2,498,766 m'
4,792,098 m'
1,447,731 m'
1,947,331 m'
2,283,042 m'
3,585,532 m'
4,912,464 m'
946,978 m'
471,738 m'
352,512 m'
1,129,258 m'
796,879 m'
529,458 m'
1,124,356 m'
4,912,464 m'
4,912,464 m'
1,387,044 m'
1,505,387 m'
1,721,863 m'
1,880,189 m'
2,600,568 m'
1,717,984 m'
2,338,266 m'
2,811,717 m'
3,591,413 m'
2,294,782 m'
68,904 M
97,320 M
129,205 M
233,863 M
144,705 M
558,208 M
755,673 M
336,476 M
419,350 M
510,716 M
606,455 M
939,654 M
1,091,024 M
1,224,024 M
1,360,298 M
1,493,199 M
122,831 M
160,653 M
185,497 M
310,738 M
447,998 M
618,853 M
972,147 M
1,719,940 M
2,239,094 M
2,727,150 M
5,586,436 M
10,558,686 M
14,108,264 M
17,395,171 M
20,366,327 M
24,286,349 M
349,374 M
535,110 M
625,850 M
777,334 M
1,053,169 M
1,350,835 M
2,078,984 M
342,423 M
359,643 M
438,636 M
421,261 M
576,005 M
612,290 M
647,590 M
682,960 M
718,260 M
1,488,658 M
1,541,658 M
1,679,464 M
1,891,653 M
1,152,774 M
1,565,988 M
2,574,578 M
2,974,435 M
3,356,411 M
3,931,940 M
5,695,642 M
6,324,668 M
7,270,609 M
7,938,779 M
8,853,808 M
117,070 M
206,276 M
295,927 M
367,127 M
549,477 M
748,675 M
953,497 M
2,817,410 M
341,198 M
387,655 M
345,795 M
708,603 M
747,042 M
923,434 M
1,028,553 M
1,134,916 M
156,826 Buah
237,742 Buah
303,311 Buah
719,795 Buah
1,095,398 Buah
1,670,504 Buah
2,365,463 Buah
58,821 Buah
62,903 Buah
78,110 Buah
94,486 Buah
167,391 Buah
175,438 Buah
198,016 Buah
220,282 Buah
242,761 Buah
63,943 Buah
375,873 Buah
720,479 Buah
1,162,491 Buah
1,805,734 Buah
2,810,738 Buah
4,449,513 Buah
7,117,776 Buah
8,993,500 Buah
11,085,932 Buah
51,973,102 Buah
66,007,470 Buah
81,325,334 Buah
96,822,438 Buah
112,301,397 Buah
27,400,123 Buah
819,601 Buah
1,539,972 Buah
1,883,457 Buah
2,411,750 Buah
3,398,557 Buah
4,530,648 Buah
7,442,568 Buah
191,597 Buah
205,072 Buah
216,477 Buah
206,972 Buah
293,117 Buah
317,997 Buah
342,947 Buah
367,997 Buah
392,947 Buah
654,129 Buah
871,310 Buah
1,428,722 Buah
2,325,117 Buah
3,576,613 Buah
5,278,087 Buah
124,762 Buah
147,615 Buah
167,933 Buah
167,723 Buah
317,811 Buah
407,700 Buah
483,546 Buah
566,203 Buah
655,810 Buah
340,433 Buah
835,915 Buah
1,338,848 Buah
1,736,789 Buah
2,623,846 Buah
3,718,056 Buah
4,903,853 Buah
9,247,911 Buah
158,425 Buah
173,875 Buah
163,352 Buah
289,714 Buah
326,974 Buah
364,602 Buah
401,933 Buah
439,561 Buah
2,646,706 Buah
8,645,460 Buah
11,103,805 Buah
15,187,975 Buah
3,793,556 Buah
3,793,556 Buah
3,863,451 Buah
2,431,464 Buah
2,250,645 Buah
2,294,365 Buah
3,323,235 Buah
4,466,061 Buah
4,526,357 Buah
4,526,357 Buah
1,274,032 Buah
2,245,330 Buah
4,413,540 Buah
7,572,925 Buah
1,767,125 Buah
1,780,600 Buah
2,131,420 Buah
860,775 Buah
1,009,027 Buah
1,156,494 Buah
1,424,478 Buah
1,620,512 Buah
1,722,785 Buah
1,990,769 Buah
3,388,917 Buah
3,650,806 Buah
4,325,190 Buah
4,956,161 Buah
5,647,861 Buah
6,321,625 Buah
7,421,723 Buah
8,045,629 Buah
8,677,366 Buah
9,939,308 Buah
11,201,250 Buah
12,463,193 Buah
1,310 M
1,417 M
1,629 M
2,159 M
2,848 M
3,803 M
4,969 M
7,886 M
9,582 M
16,210 M
447,853 M
159,000 M
204,875 Titik
168,875 Titik
213,875 Titik
187,000 Titik
67,800 Titik
136,350 Titik
278,200 Titik
3,184,300 Titik
188,200 Titik
191,200 Titik
2,076,400 Titik
195,700 Titik
214,310 Unit
339,530 Unit
491,555 Unit
4,902,000 Unit
KODE ANALISA
JENIS PEKERJAAN : Pengukuran dan pemasangan bouwplank
SATUAN PEMBAYARAN : m'
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B BAHAN
1 Kayu Balok 5/7 M.057.a m3 0.0120 1,550,000 18,600
2 Paku 2" - 3" M.109.n Kg 0.0200 16,000 320
3 Kayu Papan 3/20 M.059.j m3 0.0070 1,500,000 10,500
Jumlah Harga Bahan 29,420
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.0000 70,000 140,000
2 Tukang Kayu L.02 OH 2.0000 85,000 170,000
3 Tukang Batu L.02 OH 1.0000 85,000 85,000
4 Kepala Tukang L.03 OH 0.3000 90,000 27,000
5 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 427,000
B Bahan
Dolken Kayu diameter 8 - 10/400 4,500
1 cm M.075.a Btg 1.2500 5,625
2 Kayu M.056 m3 0.1800 5,061,236 911,023
3 Paku Biasa M.110 Kg 0.0800 24,568 1,965
4 Besi Strip M.040 Kg 1.1000 7,250 7,975
5 Semen Portland M.030 Kg 35.0000 1,000 35,000
6 Pasir Pasang M.003 m3 0.1500 100,000 15,000
7 Pasir Beton M.002 m3 0.1000 140,000 14,000
8 Koral Beton M.021.a m3 0.1500 283,840 42,576
9 Bata Merah M.022 Bh 30.0000 500 15,000
10 Seng Pelat M.134.a Lbr 0.2500 68,084 17,021
11 Jendela Naco M.161.a Bh 0.2000 265,125 53,025
12 Kaca Polos M.092 m2 0.0800 133,623 10,690
13 Kunci Tanam m.169 Bh 0.1500 169,362 25,404
14 Plywood 4mm M.131 Lbr 0.0600 110,292 6,618
Jumlah Harga Bahan 1,160,922
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 12,000
B Bahan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7500 70,000 52,500
2 Mandor L.04 OH 0.0250 100,000 2,500
Jumlah Tenaga Kerja 55,000
B Bahan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Mandor L.04 OH 0.0150 100,000 1,500
Jumlah Tenaga Kerja 12,000
B Bahan
1 Ijuk M.314 m3 6.0000 150,000 900,000
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Mandor L.04 OH 0.0250 100,000 2,500
Jumlah Tenaga Kerja 20,000
B Bahan
1 Koral M.021 m3 1.2000 165,000 198,000
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7500 70,000 52,500
2 Tukang Batu L.02.b OH 85,000 -
3 Kepala Tukang L.03 OH 90,000 -
4 Mandor L.04 OH 0.0250 100,000 2,500
Jumlah Tenaga Kerja 55,000
B Bahan
Jumlah Harga Bahan -
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Engineer dan Crew L.24 Ls 1.0000 250,000 250,000
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Tukang Batu L.02.b OH 85,000 -
3 Kepala Tukang L.03 OH 90,000 -
4 Mandor L.04 OH 0.0250 100,000 2,500
Jumlah Tenaga Kerja 20,000
B Bahan
Tanah Urug
1 Taman/Katel M.008.a m3 1.2000 75,000 90,000
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Belah M.011 m3 1.2000 181,400 217,680
2 Semen Portland M.030 Kg 202.0000 1,000 202,000
3 Pasir Pasang M.003 m3 0.4850 100,000 48,500
Jumlah Harga bahan 468,180
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 651,180
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.1 651,180
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
Pekerja L.01 OH 1.5000 70,000 105,000
Tukang batu L.02 OH 0.7500 85,000 63,750
Kepala Tukang L.03 OH 0.0750 90,000 6,750
Mandor L.04 OH 0.0750 100,000 7,500
JUMLAH TENAGA KERJA 183,000
B Bahan
Batu Belah M.011 m3 1.2000 181,400 217,680
Semen Portland M.030 Kg 163.0000 1,000 163,000
Pasir Pasang M.003 m3 0.5200 100,000 52,000
Jumlah Harga Bahan 432,680
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 615,680
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.2 615,680
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Belah M.011 m3 1.2000 181,400 217,680
2 Semen Portland M.030 Kg 136.0000 1,000 136,000
3 Pasir Pasang M.003 m3 0.5440 100,000 54,400
Jumlah Harga Bahan 408,080
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 591,080
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.3 591,080
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Belah M.011 m3 1.2000 181,400 217,680
2 Semen Portland M.030 Kg 117.0000 1,000 117,000
3 Pasir Pasang M.003 m3 0.5610 100,000 56,100
Jumlah Harga Bahan 390,780
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 573,780
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.4 573,780
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Belah M.011 m3 1.2000 181,400 217,680
2 Semen Portland M.030 Kg 91.0000 1,000 91,000
3 Pasir Pasang M.003 m3 0.5840 100,000 58,400
Jumlah Harga Bahan 367,080
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 550,080
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.5 550,080
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Belah M.011 m3 1.2000 181,400 217,680
2 Kapur M.010 m3 0.1700 2,139,559 363,725
3 Semen Portland M.030 Kg 0.1700 1,000 170
4 Pasir Pasang M.003 m3 0.3400 100,000 34,000
Jumlah Harga Bahan 615,575
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 798,575
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.6 798,575
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Belah M.011 m3 1.2000 181,400 217,680
2 Semen Portland M.030 Kg 61.0000 1,000 61,000
3 Kapur M.010 m3 0.1470 2,139,559 314,515
4 Pasir Pasang M.003 m3 0.4920 100,000 49,200
Jumlah Harga bahan 642,395
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 825,395
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.7 825,395
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kaerja 183,000
B Bahan
1 Batu belah M.011 m3 1.2000 181,400 217,680
2 Semen Portland M.030 Kg 41.0000 1,000 41,000
3 Kapur M.010 m3 0.3130 2,139,559 669,682
4 Pasir Pasang M.003 m3 0.5230 100,000 52,300
Jumlah Harga Bahan 980,662
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 1,163,662
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.8 1,163,662
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7800 70,000 54,600
2 Tukang Batu L.02 OH 0.4000 85,000 34,000
3 Kepala Tukang L.03 OH 0.0400 90,000 3,600
4 Mandor L.04 OH 0.8000 100,000 80,000
Jumlah Tenaga Kerja 172,200
B Bahan
1 Batu Belah M.011 m3 1.2000 181,400 217,680
2 Pasir Urug M.001 m3 0.4320 90,000 38,880
Jumlah Harga Bahan 256,560
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 428,760
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.9 428,760
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 3.4000 70,000 238,000
2 Tukang Batu L.02 OH 0.8500 85,000 72,250
3 Kepala Tukang L.03 OH 0.0850 90,000 7,650
4 Mandor L.04 OH 0.1700 100,000 17,000
Jumlah Tenaga Kerja 334,900
B Bahan
1 Batu Belah M.011 m3 0.4800 181,400 87,072
2 Semen Portland M.030 Kg 194.0000 1,000 194,000
3 Pasir Beton M.002 m3 0.3120 140,000 43,680
4 Kerikil M.020.a m3 0.4680 165,000 77,220
5 Besi Beton M.037 Kg 126.0000 6,500 819,000
6 Kawat Beton M.100 Kg 1.8000 16,000 28,800
Jumlah Harga Bahan 1,249,772
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 1,584,672
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.10 1,584,672
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.4000 70,000 168,000
2 Tukang Batu L.02 OH 0.8000 85,000 68,000
3 Kepala Tukang L.03 OH 0.0800 90,000 7,200
4 Mandor L.04 OH 0.1190 100,000 11,900
Jumlah Tenaga Kerja 255,100
B Bahan
1 Batu Belah M.011 m3 0.4500 181,400 81,630
2 Semen Portland M.030 Kg 194.0000 1,000 194,000
3 Pasir Beton M.002 m3 0.3120 140,000 43,680
4 Kerikil M.020 m3 0.4680 165 77
Jumlah Harga bahan 319,387
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 574,487
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.3.2.1.11 574,487
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Kali M.011.o m3 1.2000 221,600 265,920
2 Portland Cement (PC) M.030 kg 202.0000 1,000 202,000
3 Pasir Pasang M.003 m3 0.4850 100,000 48,500
Jumlah Harga Bahan 516,420
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Kali M.011.o m3 1.2000 221,600 265,920
2 Portland Cement (PC) M.030 kg 163.0000 1,000 163,000
3 Pasir Pasang M.003 m3 0.5200 100,000 52,000
Jumlah Harga Bahan 480,920
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Kali M.011.o m3 1.2000 221,600 265,920
2 Portland Cement (PC) M.030 kg 136.0000 1,000 136,000
3 Pasir Pasang M.003 m3 0.5440 100,000 54,400
Jumlah Harga Bahan 456,320
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Kali M.011.o m3 1.2000 221,600 265,920
2 Portland Cement (PC) M.030 kg 117.0000 1,000 117,000
3 Pasir Pasang M.003 m3 0.5610 100,000 56,100
Jumlah Harga Bahan 439,020
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Kali M.011.o m3 1.2000 221,600 265,920
2 Portland Cement (PC) M.030 kg 91.0000 1,000 91,000
3 Pasir Pasang M.003 m3 0.5840 100,000 58,400
Jumlah Harga Bahan 415,320
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Kali M.011.o m3 1.2000 221,600 265,920
2 Kapur M.010 m3 0.1700 2,139,559 363,725
3 Semen Merah M.030.d m3 0.1700 284,214 48,316
4 Pasir Pasang M.003 m3 0.3400 100,000 34,000
Jumlah Harga Bahan 711,961
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Kali M.011.o m3 1.2000 221,600 265,920
2 Portland Cement (PC) M.030 kg 61.0000 1,000 61,000
3 Kapur M.010 m3 0.1470 2,139,559 314,515
4 Pasir Pasang M.003 m3 0.4920 100,000 49,200
Jumlah Harga Bahan 690,635
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 70,000 105,000
2 Tukang Batu L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0750 90,000 6,750
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 183,000
B Bahan
1 Batu Kali M.011.o m3 1.2000 221,600 265,920
2 Portland Cement (PC) M.030 kg 41.0000 1,000 41,000
3 Kapur M.010 m3 0.1310 2,139,559 280,282
4 Pasir Pasang M.003 m3 0.5230 100,000 52,300
Jumlah Harga Bahan 639,502
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.2000 70,000 84,000
2 Tukang Batu L.02.b OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0600 100,000 6,000
Jumlah Tenaga Kerja 108,800
B Bahan
1 Semen Portland M.030 Kg 230.0000 1,000 230,000
2 Pasir Beton M.002.a Kg 893.0000 127 113,655
3 Kerikil (Maks 30 mm) M.019 Kg 1,027.0000 165 169,455
4 Air M.230.a Ltr 200.0000 25 5,000
Jumlah Harga Bahan 518,110
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 626,910
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.1.4 626,910
JENIS PEKERJAAN : Sloof
SATUAN PEMBAYARAN : m³
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1800 70,000 12,600
2 Tukang Batu L.02 OH 0.0200 85,000 1,700
3 Tukang Kayu L.02 OH 0.0200 85,000 1,700
4 Tukang Besi L.02 OH 0.0200 85,000 1,700
5 Kepala Tukang L.03 OH 0.0060 90,000 540
6 Mandor L.04 OH 0.0090 100,000 900
Jumlah Tenaga Kerja 19,140
B Bahan
1 Kayu Kelas III M.067 m3 0.0020 1,500,000 3,000
2 Paku 5 cm - 12 cm M.109.h Kg 0.0100 16,000 160
3 Minyak Bekisting M.237.b Ltr 4,500 -
4 Besi Beton Polos M.037 Kg 3.0000 6,500 19,500
5 Kawat Beton M.100 Kg 0.4500 16,000 7,200
6 Semen Portland M.030 Kg 4.0000 1,000 4,000
7 Pasir Beton M.002 m3 0.0060 140,000 840
8 Kerikil M.020.a m3 0.0090 165,000 1,485
Jumlah Harga Bahan 36,185
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 55,325
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 55,325
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.6790 70,000 187,530
2 Tukang Batu L.02 OH 0.2750 85,000 23,375
3 Tukang Besi L.02.e OH 1.0290 85,000 87,465
4 Kepala Tukang L.03 OH 0.1309 90,000 11,781
5 Mandor L.04 OH 0.1418 100,000 14,180
Jumlah Tenaga Kerja 324,331
B BAHAN
Tulangan
1 Besi Beton Polos M.037 Kg 147.0000 6,500 955,500
2 Kawat Beton M.100 Kg 2.1000 16,000 33,600
Beton
1 Semen Portland M.030 Kg 371.0000 1,000 371,000
2 Pasir Beton M.002 m3 0.4986 140,000 69,804
3 Kerikil M.020.a m3 0.7756 165,000 127,974
Jumlah Harga Bahan 1,557,878
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 1,882,209
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 1,882,209
KODE ANALISA : DD.033
JENIS PEKERJAAN : (K3) Pemasangan 1 m² Bekisting Untuk Sloof Expose
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5200 70,000 36,400
2 Tukang Kayu L.02 OH 0.2600 85,000 22,100
3 Kepala Tukang L.03 OH 0.0260 90,000 2,340
4 Mandor L.04 OH 0.0260 100,000 2,600
Jumlah Tenaga Kerja 63,440
B Bahan
1 Kayu Perancah I (papan) Expose M.061.b m3 0.0450 1,500,000 67,500
2 Paku 5 dan 10 cm M.109.e kg 0.3000 17,746 5,324
3 Minyak bekesting M.237.b ltr 0.1000 4,500 450
Jumlah Harga Bahan 73,274
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1800 70,000 12,600
2 Tukang Batu L.02 OH 0.0200 85,000 1,700
3 Tukang Kayu L.02 OH 0.0200 85,000 1,700
4 Tukang Besi L.02 OH 0.0200 85,000 1,700
5 Kepala Tukang L.03 OH 0.0060 90,000 540
6 Mandor L.04 OH 0.0090 100,000 900
Jumlah Tenaga Kerja 19,140
B Bahan
1 Kayu Kelas III M.067 m3 0.0020 1,500,000 3,000
2 Paku 5 cm - 12 cm M.109.h Kg 0.0100 16,000 160
3 Minyak Bekisting M.237.b Ltr 4,500 -
4 Besi Beton Polos M.037 Kg 3.0000 6,500 19,500
5 Kawat Beton M.100 Kg 0.4500 16,000 7,200
6 Semen Portland M.030 Kg 4.0000 1,000 4,000
7 Pasir Beton M.002 m3 0.0060 140,000 840
8 Kerikil M.020.a m3 0.0090 165,000 1,485
Jumlah Harga Bahan 36,185
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 55,325
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 55,325
KODE ANALISA : A.4.1.2.1.
JENIS PEKERJAAN : (K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1320 70,000 9,240
2 Tukang Batu L.02 OH 0.0220 85,000 1,870
3 Kepala Tukang L.03 OH 0.0020 90,000 180
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 11,990
B Bahan
1 Semen PC M.030 Kg 26.0800 1,000 26,080
2 Pasir Beton M.002.a Kg 60.8000 127 7,738
3 Kerikil (Maks 30 mm) M.019 Kg 82.3200 165 13,583
4 Air M.230.a Ltr 17.2000 25 430
Jumlah Harga Bahan 47,831
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 59,821
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.2.1 59,821
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1980 70,000 13,860
2 Tukang Batu L.02 OH 0.0330 85,000 2,805
3 Kepala Tukang L.03 OH 0.0030 90,000 270
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 17,935
B Bahan
1 Semen PC M.030 Kg 39.1200 1,000 39,120
2 Pasir Beton M.002.a Kg 91.2000 127 11,607
3 Kerikil (Maks 30 mm) M.019 Kg 123.4800 165 20,374
4 Air M.230.a Ltr 25.8000 25 645
Jumlah Harga Bahan 71,746
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 89,681
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.2.3 89,681
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2480 70,000 17,360
2 Tukang Batu L.02 OH 0.0410 85,000 3,485
3 Kepala Tukang L.03 OH 0.0040 90,000 360
4 Mandor L.04 OH 0.0130 100,000 1,300
Jumlah Tenaga Kerja 22,505
B Bahan
1 Semen PC M.030 Kg 48.9000 1,000 48,900
2 Pasir Beton M.002.a Kg 114.0000 127 14,509
3 Kerikil (Maks 30 mm) M.019 Kg 154.3500 165 25,468
4 Air M.230.a Ltr 32.2500 25 806
Jumlah Harga Bahan 89,683
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 112,188
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.2.4 112,188
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0070 70,000 490
2 Tukang Kayu L.02 OH 0.0760 85,000 6,460
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0010 100,000 100
Jumlah Tenaga Kerja 7,770
B Bahan
1 Lantai Kerja t=10cm M.271 m3 0.0800 4,305,759 344,461
2 Besi Hollow (50 x 50 x 3) mm M.035 Kg 9.3940 45,025 422,961
3 Kayu Kaso 5/7 (Lebar 5 cm, Tinggi 7 m3 0.0050 22,005,375 110,027
cm) M.063.a
4 Phenol Film 12mm M.346 Lbr 0.0800 259,823 20,786
5 Minyak bekisting M.237.b Ltr 0.2000 4,500 900
6 Dinabolt dia 12mm (10 s.d 15 cm) M.120 bh 3.8820 12,726 49,402
Jumlah Harga Bahan 948,536
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 956,306
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.2.5 956,306
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0040 70,000 280
2 Tukang Kayu L.02 OH 0.0380 85,000 3,230
3 Kepala Tukang L.03 OH 0.0040 90,000 360
4 Mandor L.04 OH 0.0010 100,000 100
Jumlah Tenaga Kerja 3,970
B Bahan
Kayu Kaso 5/7 (Lebar 5 cm, Tinggi 7
1 m3 0.0050 22,005,375 110,027
cm) M.063.a
2 Phenol Film 12 mm M.346 Lbr 0.0430 259,823 11,172
3 Minyak Cetakan (Bekisting) M.237.b Ltr 0.2000 4,500 900
4 Paku (5 s.d 7) cm M.109.c kg 0.0460 19,354 890
5 Dinabolt dia 12mm (10-15 cm) M.120 bh 0.6930 12,726 8,819
Jumlah Harga Bahan 131,809
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 135,779
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.2.6 135,779
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0530 70,000 3,710
2 Tukang Kayu L.02 OH 0.0180 85,000 1,530
3 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 5,740
B Bahan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0890 70,000 6,230
2 Tukang Kayu L.02 OH 0.0300 85,000 2,550
3 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 9,280
B Bahan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0710 70,000 4,970
2 Tukang kayu L.02 OH 0.0240 85,000 2,040
3 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 7,510
B Bahan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0640 70,000 4,480
2 Tukang Batu L.02 OH 0.2440 85,000 20,740
3 Tukang Vibrator L.02 OH 0.1280 85,000 10,880
4 Kepala Tukang L.03 OH 0.0340 90,000 3,060
5 Mandor L.04 OH 0.0730 100,000 7,300
Jumlah Tenaga Kerja 46,460
B Bahan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0690 70,000 4,830
2 Tukang Batu L.02 OH 0.2420 85,000 20,570
3 Tukang Vibrator L.02 OH 0.1380 85,000 11,730
4 Kepala Tukang L.03 OH 0.0370 90,000 3,330
5 Mandor L.04 OH 0.0730 100,000 7,300
Jumlah Tenaga Kerja 47,760
B Bahan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0610 70,000 4,270
2 Tukang Batu L.02 OH 0.2130 85,000 18,105
3 Tukang Vibrator L.02 OH 0.1220 85,000 10,370
4 Kepala Tukang L.03 OH 0.0330 90,000 2,970
5 Mandor/Supervisior/Penyelia L.04 OH 0.0730 100,000 7,300
Jumlah Tenaga Kerja 43,015
B Bahan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Operator Crane L.08 OH 0.0670 147,000 9,849
2 Pembantu Operator Crane L.09 OH 0.0670 89,250 5,980
3 Pekerja L.01 OH 0.0670 70,000 4,690
4 Tukang Batu L.02 OH 0.0670 85,000 5,695
5 Tukang Ereksi L.02 OH 0.1340 85,000 11,390
6 Kepala Tukang L.03 OH 0.0670 90,000 6,030
7 Mandor L.04 OH 0.0670 100,000 6,700
Jumlah Tenaga Kerja 50,334
B Bahan
1 Solar M.232.c Ltr 6.6760 9,700 64,757
Jumlah Harga Bahan 64,757
C Peralatan
1 Sewa Crane E.07.g unit-hari 0.0670 785,406 52,622
2 Sewa Pipe Support E.74 buah-hari 1.1000 15,908 17,498
Jumlah Harga Alat 70,120
D Jumlah (A+B+C) 185,211
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.2.14 185,211
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Operator Crane L.08 OH 0.0830 147,000 12,201
2 Pembantu Operator Crane L.09 OH 0.0830 89,250 7,408
3 Pekerja L.01 OH 0.0830 70,000 5,810
4 Tukang Batu L.02 OH 0.0830 85,000 7,055
5 Tukang Ereksi L.02 OH 0.1660 85,000 14,110
6 Kepala Tukang L.03 OH 0.0830 90,000 7,470
7 Mandor L.04 OH 0.0830 100,000 8,300
Jumlah Tenaga Kerja 42,745
B Bahan
1 Solar M.232.c Ltr 8.2770 9,700 80,287
Jumlah Harga Bahan 80,287
C Peralatan
1 Sewa Crane E.07.g unit-hari 0.0830 785,406 65,189
2 Sewa Pipe Support E.74 buah-hari 2.2000 15,908 34,997
Jumlah Harga Alat 100,185
D Jumlah (A+B+C) 223,217
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.2.16 223,217
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Operator Crane L.08 OH 0.0190 147,000 2,793
2 Pembantu Operator Crane L.09 OH 0.0190 89,250 1,696
3 Pekerja L.01 OH 0.0190 70,000 1,330
4 Tukang Batu L.02 OH 0.0380 85,000 3,230
Jumlah Tenaga Kerja 9,049
B Bahan
1 Solar M.232.c Ltr 1.8970 9,700 18,401
Jumlah Harga Bahan 18,401
C Peralatan
1 Sewa Crane E.07.g unit-hari 0.0190 785,406 14,923
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Operator Crane L.08 OH 0.0190 147,000 2,793
2 Pembantu Operator Crane L.09 OH 0.0190 89,250 1,696
3 Pekerja L.01 OH 0.0190 70,000 1,330
4 Tukang Batu L.02 OH 0.0380 85,000 3,230
Jumlah Tenaga Kerja 9,049
B Bahan
1 Solar M.232.c Ltr 1.8970 9,700 18,401
Jumlah Harga Bahan 18,401
C Peralatan
1 Sewa Crane E.07.g unit-hari 0.0190 785,406 14,923
Jumlah Harga Alat 14,923
D Jumlah (A+B+C) 42,372
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.2.18 42,372
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Operator Crane L.08 OH 0.0190 147,000 2,793
2 Pembantu Operator Crane L.09 OH 0.0190 89,250 1,696
3 Pekerja L.01 OH 0.0190 70,000 1,330
4 Tukang Batu L.02 OH 0.0380 85,000 3,230
Jumlah Tenaga Kerja 9,049
B Bahan
1 Solar M.232.c Ltr 1.8970 9,700 18,401
Jumlah Harga Bahan 18,401
C Peralatan
1 Sewa Crane E.07.g Unit-Hari 0.0190 785,406 14,923
Jumlah Harga Alat 14,923
D Jumlah (A+B+C) 42,372
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.1.2.19 42,372
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
Jumlah Tenaga Kerja -
B Bahan
1 Semen Grout M.030.C Kg 1,200.0000 23,200 27,840,000
2 Screening M.344 Kg 650.0000 - -
3 Air M.230.a Ltr 350.0000 25 8,750
Jumlah Harga Bahan 27,848,750
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
Jumlah Tenaga Kerja -
B Bahan
1 Semen Grout M.030.C Kg 1,850.0000 23,200 42,920,000
2 Air M.230.a Ltr 400.0000 25 10,000
Jumlah Harga Bahan 42,930,000
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Tukang Batu L.02 OH 0.3670 85,000 31,195
2 Kepala Tukang L.03 OH 0.0740 90,000 6,660
3 Mandor L.04 OH 0.0370 100,000 3,700
Jumlah Tenaga Kerja 41,555
B Bahan
Jumlah Harga Bahan -
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1470 70,000 10,290
2 Tukang Kayu L.02 OH 0.1470 85,000 12,495
3 Kepala Tukang L.03 OH 0.0150 90,000 1,350
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 24,635
B Bahan
Kayu Kaso 5/7 (Lembar 5 cm, Tinggi
1 M3 0.0120 8,436,914 101,243
7 cm) M.063.c
2 Papan Cor M.272 M3 0.0040 604,485 2,418
3 Paku (5 s.d 7) cm M.109.c Kg 264.0000 19,354 5,109,489
Jumlah Harga Bahan 5,213,150
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2200 70,000 15,400
2 Tukang Kayu L.02.a OH 0.0220 85,000 1,870
3 Tukang Besi L.02.e OH 0.2200 85,000 18,700
4 Mandor L.04 OH 0.0110 100,000 1,100
Jumlah Tenaga Kerja 37,070
B Bahan
Jumlah Harga Bahan -
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0600 70,000 4,200
2 Tukang Las Konstruksi L.02.j OH 0.0600 85,000 5,100
3 Kepala Tukang L.03 OH 0.0060 90,000 540
4 Mandor L.04 OH 0.0030 100,000 300
Jumlah Tenaga Kerja 10,140
B Bahan
1 Baja Profil M.043 Kg 1.1500 7,250 8,338
2 Solar Industri M.232.c Itr 0.0100 9,700 97
3 Minyak Pelumas M.233 Itr 0.0010 20,550 21
4 Elektroda M.366 kg 0.0200 40,500 810
Jumlah Harga Bahan 8,338
C Peralatan
1 Sewa Mesin Las (150A) E.58.d hari 0.0160 125,000 2,000
Jumlah Harga Alat 2,000
D Jumlah (A+B+C) 20,478
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.2.1.1. 20,478
JENIS PEKERJAAN : Pintu besi
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0500 70,000 73,500
2 Tukang Las Biasa L.02.k OH 1.0500 85,000 89,250
3 Kepala Tukang L.03 OH 0.1050 90,000 9,450
4 Mandor L.04 OH 0.0520 100,000 5,200
Jumlah Tenaga Kerja 177,400
B Bahan
1 Besi Siku L 30.30.3 M.042 Kg 15.0000 7,250 108,750
2 Besi Pelat Baja M.046 Kg 32.8000 7,250 237,800
3 Kawat Las M.101 Kg 0.0500 19,000 950
Jumlah Harga Bahan 347,500
C Peralatan
Jumlah Harga Alat 347,500
D Jumlah (A+B+C) 872,400
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.2.1.4. 872,400
JENIS PEKERJAAN : Kusen pintu
SATUAN PEMBAYARAN : m'
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0430 70,000 3,010
2 Tukang Khusus Alumunium L.02.n OH 0.0430 85,000 3,655
3 Kepala Tukang L.03 OH 0.0043 90,000 387
4 Mandor L.04 OH 0.0021 100,000 210
Jumlah Tenaga Kerja 7,262
B Bahan
1 Profil Alumunium M.086 m 1.1000 202,900 223,190
2 Skrup Fixer M.123 bh 2.0000 159 318
3 Sealant M.244 Tube 0.0600 16,500 990
Jumlah Harga Bahan 224,498
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 231,760
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.2.1.11. 231,760
JENIS PEKERJAAN : Talang
SATUAN PEMBAYARAN : m'
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang L.02 OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0010 100,000 100
Jumlah Tenaga Kerja 32,900
B Bahan
1 talang galvalum m 1.0500 42,000 44,100
2 Paku Seng M.115 Kg 0.0200 21,000 420
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Tukang L.02 OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0130 100,000 1,300
Jumlah Tenaga Kerja 42,300
B Bahan
1 Rangka Metal Hollow 40.40.2 mm M.034 M' 3.5000 30,500 106,750
100% x
2 Assesoris (Perkuatan, Las dll) M.291 Ls 30,500 30,500
rangka
Jumlah Harga Bahan 137,250
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 179,550
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.2.1.20. 179,550
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3500 70,000 24,500
2 Tukang Besi L.02.e OH 0.3500 85,000 29,750
3 Kepala Tukang L.03 OH 0.0350 90,000 3,150
4 Mandor L.04 OH 0.0180 100,000 1,800
Jumlah Tenaga Kerja 59,200
B Bahan
1 Rangka Hollow M.034 m' 4.0000 30,500 122,000
2 Assesoris (Perkuatan, Las dll) M.291 Ls 100% x 30,500
rangka 30,500
Jumlah Harga Bahan 152,500
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 211,700
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.2.1.21. 211,700
JENIS PEKERJAAN : Pemasangan rangka atap galvalum
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7500 70,000 52,500
2 Tukang Besi L.02.e OH 0.5000 85,000 42,500
3 Kepala Tukang L.03 OH 0.5000 90,000 45,000
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 145,000
B Bahan
1 Rangka atap galvalum m' 5.4912 3,600 19,768
2 Besi Strip / Plat Plendes M.040 kg 0.4212 7,250 3,054
3 Baut Segala Ukuran M.119.c kg 0.2521 20,500 5,168
4 Angker Bar / Dynabolt M.119.d kg 0.1411 20,500 2,893
Jumlah Harga Bahan 30,883
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0200 70,000 1,400
2 Tukang Besi L.02.e OH 0.0300 85,000 2,550
3 Kepala Tukang L.03 OH 90,000 -
4 Mandor L.04 OH 100,000 -
Jumlah Tenaga Kerja 3,950
B Bahan
1 Angker Bar M.367 bh 1.0000 23,000 23,000
Jumlah Harga Bahan 23,000
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0610 70,000 4,270
2 Tukang Besi L.02.t OH 0.0061 85,000 519
3 Kepala Tukang L.03 OH 0.0061 90,000 549
4 Mandor L.04 OH 0.0003 100,000 30
Jumlah Tenaga Kerja 5,368
B Bahan
1 Besi beton (polos / ulir) M.037 kg 1.0500 6,500 6,825
2 Solar non subsidi M.232.d ltr 0.0100 9,700 97
3 Oli (Minyak pelumas) M.233 ltr 0.0010 20,550 21
4 Elektroda M.366 kg 0.0200 40,500 810
Jumlah Harga Bahan 7,753
C Peralatan
1 Mesin Las Listrik 250 A, Diesel E.58.e bh 0.0160 150,000 2,400
Jumlah Harga Alat 2,400
D Jumlah (A+B+C) 15,520
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) Kg FF.025 15,520
JENIS PEKERJAAN : Plat plendes t = 15 mm
SATUAN PEMBAYARAN : kg
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0610 70,000 4,270
2 Tukang Besi L.02.t OH 0.0061 85,000 519
3 Kepala Tukang L.03 OH 0.0061 90,000 549
4 Mandor L.04 OH 0.0003 144,375 43
Jumlah Tenaga Kerja 5,381
B Bahan
1 Besi beton (polos / ulir) M.037 kg 1.0500 6,500 6,825
2 Solar non subsidi M.232.d ltr 0.0100 9,700 97
3 Oli (Minyak pelumas) M.233 ltr 0.0010 20,550 21
4 Elektroda M.366 kg 0.0200 40,500 810
Jumlah Harga Bahan 7,753
C Peralatan
1 Mesin Las Listrik 250 A, Diesel E.58.e bh 0.0160 150,000 2,400
Jumlah Harga Alat 2,400
D Jumlah (A+B+C) 15,533
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) Kg FF.026 15,533
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0200 70,000 1,400
2 Tukang Besi L.02.t OH 0.0300 85,000 2,550
Jumlah Tenaga Kerja 3,950
B Bahan
1 Baut baja L.7m M.16mm bh 1.0000 12,500 12,500
Jumlah Harga Bahan 12,500
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0200 70,000 1,400
2 Tukang Besi L.02.t OH 0.0300 85,000 2,550
Jumlah Tenaga Kerja 3,950
B Bahan
1 Baut baja L.5cm.M.16mm (full drat) bh 1.0000 - -
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang L.02 OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 75,570
B Bahan
1 Bondek 0.75mm m2 1.0500 - -
2 Paku Sekrup M.111 kg 0.0200 20,000 400
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang L.02 OH 1.0000 85,000 85,000
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 93,900
B Bahan
1 Bubung Atap Seng Galvalum M.141.n lbr 2.4000 - -
2 Sekrup segala ukuran M.372 bh 6.0000 125 750
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1200 70,000 8,400
2 Tukang L.02 OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0010 100,000 100
Jumlah Tenaga Kerja 27,300
B Bahan
1 Pipa PVC tipe D Ø 3 " M.218.z m1 1.0000 40,000 40,000
2 Lem Pipa PVC M.246.a kg 0.1000 36,000 3,600
3 Knee PVC Ø 3 " M.223.o bh 0.2500 6,500 1,625
4 Shock PVC Ø 3 " M.229 bh 0.2500 25,000 6,250
Jumlah Harga Bahan 51,475
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0750 70,000 5,250
2 Tukang L.02 OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 12,945
B Bahan
1 Spandeck 0.4mm M.780 m2 1.5000 55,000 82,500
2 Paku Skrup M.111 kg 0.0200 20,000
Jumlah Harga Bahan 82,500
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang L.02 OH 0.0670 85,000 5,695
3 Tukang Besi L.03 OH 0.0070 90,000 630
4 Kepala Tukang L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 16,825
B Bahan
1 Roof Light Fibreglass M.139 m2 1.1000 55,000 60,500
2 Sekrup segala ukuran M.372.a kg 7.8000 45,000 351,000
Jumlah Harga Bahan 411,500
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3000 70,000 21,000
2 Tukang Pipa L.02.i OH 0.3000 85,000 25,500
3 Kepala Tukang Batu L.03.b OH 0.0150 90,000 1,350
4 Mandor L.03 OH 0.0150 90,000 1,350
Jumlah Tenaga Kerja 49,200
B Bahan
1 Tandon Air PVC V = 1.0 m3 M.387.a bh 1.0000 2,001,800 2,001,800
2 Perlengkapan 0.1500 200,180 30,027
Jumlah Harga Bahan 2,031,827
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Tukang Pipa L.02.i OH 0.2500 85,000 21,250
3 Kepala Tukang Batu L.03.b OH 0.0125 90,000 1,125
4 Mandor L.03 OH 0.0125 90,000 1,125
Jumlah Tenaga Kerja 41,000
B Bahan
1 Tandon Air Stainless V = 0.5 m3 M.387.b bh 1.0000 3,128,800 3,128,800
2 Perlengkapan 0.1500 312,880 46,932
Jumlah Harga Bahan 3,175,732
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0610 70,000 4,270
2 Tukang Besi L.02.t OH 0.0061 85,000 519
3 Kepala Tukang L.03 OH 0.0061 90,000 549
4 Mandor L.04 OH 0.0003 144,375 43
Jumlah Tenaga Kerja 5,381
B Bahan
1 Besi beton (polos / ulir) M.037 kg 1.0500 6,500 6,825
2 Solar non subsidi M.232.d ltr 0.0100 9,700 97
3 Oli (Minyak pelumas) M.233 ltr 0.0010 20,550 21
4 Elektroda M.366 kg 0.0200 40,500 810
Jumlah Harga Bahan 7,753
C Peralatan
1 Mesin Las Listrik 250 A, Diesel E.58.e bh 0.0160 150,000 2,400
Jumlah Harga Alat 2,400
D Jumlah (A+B+C) 15,533
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) Kg FF.026 15,533
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0610 70,000 4,270
2 Tukang Besi L.02.t OH 0.0061 85,000 519
3 Kepala Tukang L.03 OH 0.0061 90,000 549
4 Mandor L.04 OH 0.0003 144,375 43
Jumlah Tenaga Kerja 5,381
B Bahan
1 Besi beton (polos / ulir) M.037 kg 1.0500 6,500 6,825
2 Solar non subsidi M.232.d ltr 0.0100 9,700 97
3 Oli (Minyak pelumas) M.233 ltr 0.0010 20,550 21
4 Elektroda M.366 kg 0.0200 40,500 810
Jumlah Harga Bahan 7,753
C Peralatan
1 Mesin Las Listrik 250 A, Diesel E.58.e bh 0.0160 150,000 2,400
Jumlah Harga Alat 2,400
D Jumlah (A+B+C) 15,533
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) Kg FF.026 15,533
JENIS PEKERJAAN : Pemasangan ACP
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5000 70,000 35,000
2 Tukang L.02 OH 0.5000 85,000 42,500
3 Kepala Tukang L.03 OH 0.0500 90,000 4,500
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 87,000
B Bahan
1 Alluminium Composit lbr 1.0000 769,900 769,900
2 Assesoris (Perkuatan, Las dll) Harga acp 0.3500 269,465 269,465
Jumlah Harga Bahan 1,039,365
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 1,126,365
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.2.1.20. 1,126,365
KODE ANALISA :
JENIS PEKERJAAN : Railing besi
SATUAN PEMBAYARAN : m²
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7500 70,000 52,500
2 Tukang Besi L.02.t OH 0.5000 85,000 42,500
3 Kepala Tukang L.03 OH 0.0500 90,000 4,500
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 104,500
B Bahan
1 Baja Profil M.053.e kg 10.1907 29,827 303,954
2 Pipa Galvanis Ø 2 ", tebal 2.3 mm M.214.q m1 1.2000 228,493 274,192
Jumlah Harga Bahan 578,145
C Peralatan
1 Mesin Las Listrik 250 A, Diesel E.58.d bh 0.5000 125,000 62,500
Jumlah Harga Alat 62,500
D Jumlah (A+B+C) 745,145
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) m2 FF.037 745,145
KODE ANALISA :
JENIS PEKERJAAN : Pemasangan rangka kanopi
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4250 70,000 29,750
2 Tukang Besi L.02.t OH 0.2750 85,000 23,375
3 Kepala Tukang L.03 OH 0.0275 90,000 2,475
4 Mandor L.04 OH 0.0275 100,000 2,750
Jumlah Tenaga Kerja 58,350
B Bahan
1 Besi Hollow M.035 kg 9.2844 45,025 418,026
2 Elektroda M.366 kg 0.5000 40,500 20,250
Jumlah Harga Bahan 438,276
C Peralatan
1 Mesin Las Listrik 250 A, Diesel E.58.d bh 0.1667 125,000 20,838
Jumlah Harga Alat 20,838
D Jumlah (A+B+C) 517,464
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) m2 FF.044.a 517,464
JENIS PEKERJAAN : Rabatan bata merah
SATUAN PEMBAYARAN : m3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6000 70,000 42,000
4 Mandor L.04 OH 0.0300 100,000 3,000
Jumlah Tenaga Kerja 45,000
B Bahan
1 Bata Merah M.022.a m3 1.2000 450,000 540,000
Jumlah Harga Bahan 540,000
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 585,000
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 585,000
JENIS PEKERJAAN : Pasang dinding bata merah 1/2 bata campuran 1SP : 5PP
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3000 70,000 21,000
2 Tukang Batu L.02.b OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0150 100,000 1,500
Jumlah Tenaga Kerja 31,900
B Bahan
1 Bata Merah M.022 bh 70.0000 500 35,000
2 Semen Portland M.030 Kg 9.6800 1,000 9,680
3 Pasir Pasang M.003 m3 0.0450 100,000 4,500
Jumlah Harga Bahan 49,180
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 81,080
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A. 4.4.1.10 81,080
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.3000 70,000 21,000
2 Tukang Batu L.02 OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0150 100,000 1,500
Jumlah Tenaga Kerja 31,900
B Bahan
1 Bata Merah M.022 bh 70.0000 500 35,000
2 Semen Portland M.030 Kg 8.3200 1,000 8,320
3 Pasir Pasang M.003 m3 0.0490 100,000 4,900
Jumlah Harga Bahan 48,220
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 80,120
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A. 4.4.1.11 80,120
KODE ANALISA :
JENIS PEKERJAAN : Rollag bata merah
SATUAN PEMBAYARAN :m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3000 70,000 21,000
2 Tukang Batu L.02 OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0150 100,000 1,500
Jumlah Tenaga Kerja 31,900
B Bahan
1 Bata Merah M.022 bh 70.0000 500 35,000
2 Semen Portland M.030 Kg 6.5000 1,000 6,500
3 Pasir Pasang M.003 m3 0.0500 100,000 5,000
Jumlah Harga Bahan 46,500
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 78,400
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A. 4.4.1.12 78,400
JENIS PEKERJAAN : Plesteran 1 Pc : 5 Ps, tebal 15 mm
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3000 70,000 21,000
2 Tukang Batu L.02.b OH 0.1500 85,000 12,750
3 Kepala Tukang L.03 OH 0.0150 90,000 1,350
4 Mandor L.04 OH 0.0150 100,000 1,500
Jumlah Tenaga Kerja 36,600
B Bahan
1 PC M.030 Kg 5.1840 1,000 5,184
2 PP M.003 m3 0.0260 100,000 2,600
Jumlah Harga Bahan 7,784
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 44,384
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 44,384
KODE ANALISA : A.4.4.2.27.
JENIS PEKERJAAN : Pemasangan 1 m2 acian.
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Batu L.02.b OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 24,400
B Bahan
1 Semen PC M.030 Kg 3.2500 1,000 3,250
Jumlah Harga Bahan 3,250
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 27,650
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.4.2.27 27,650
KODE ANALISA : HH.031
JENIS PEKERJAAN : Benangan Sudut
SATUAN PEMBAYARAN : m'
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 70,000 -
2 Tukang Batu L.02.b OH 0.1200 85,000 10,200
3 Kepala Tukang L.03 OH 90,000 -
4 Mandor L.04 OH 100,000 -
Jumlah Tenaga Kerja 10,200
B Bahan
1 Portland Cement (PC) M.030 kg 6.5000 1,000 6,500
2 Pasir Pasang M.003 m3 0.0210 100,000 2,100
Jumlah Harga Bahan 8,600
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 70,000 49,000
2 Tukang Batu L.02.b OH 0.3500 85,000 29,750
3 Kepala Tukang L.03 OH 0.0350 90,000 3,150
4 Mandor L.04 OH 0.0350 100,000 3,500
Jumlah Tenaga Kerja 85,400
B Bahan
1 Ubin Keramik M.189.a Doos 1.0500 35,000 36,750
2 Semen Portland M.030 Kg 10.4000 1,000 10,400
3 Pasir Pasang M.003 m3 0.0450 100,000 4,500
4 Semen Warna M.030.a Kg 0.5000 16,000 8,000
Jumlah Harga Bahan 59,650
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 145,050
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.4.3.36 145,050
JENIS PEKERJAAN : Pemasangan plint dinding 10x20
SATUAN PEMBAYARAN : m'
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0900 70,000 6,300
2 Tukang Batu L.02.b OH 0.0900 85,000 7,650
3 Kepala Tukang L.03 OH 0.0350 90,000 3,150
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 17,600
B Bahan
1 Plint Keramik M.201.b Bh 10.6000 5,000 53,000
2 Semen Portland M.030 Kg 1.1400 1,000 1,140
3 Pasir Pasang M.003 m3 0.0030 100,000 300
4 Semen Warna M.030.a Kg 0.0500 16,000 800
Jumlah Harga Bahan 55,240
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 72,840
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.4.3.40 72,840
JENIS PEKERJAAN : Pemasangan keramik lantai 40x40 unpolish
SATUAN PEMBAYARAN : m²
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 70,000 49,000
2 Tukang L.02 OH 0.3500 85,000 29,750
3 Kepala Tukang L.03 OH 0.0350 90,000 3,150
4 Mandor L.04 OH 0.0350 100,000 3,500
Jumlah Tenaga Kerja 85,400
B Bahan
Keramik Lantai 40 x 40 cm
1 M.192.h bh 6.9300 4,500 31,185
unpolish
2 Portland Cement (PC) M.030 kg 9.8000 1,000 9,800
3 Pasir Pasang M.003 m3 0.0215 100,000 2,150
4 Portland Cement (PC) Warna M.030.a kg 1.3000 16,000 20,800
Jumlah Harga Bahan 63,935
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 70,000 49,000
2 Tukang L.02 OH 0.3500 85,000 29,750
3 Kepala Tukang L.03 OH 0.0350 90,000 3,150
4 Mandor L.04 OH 0.0350 100,000 3,500
Jumlah Tenaga Kerja 85,400
B Bahan
1 Keramik Lantai 40 x 40 cm M.192.i bh 6.9300 4,500 31,185
2 Portland Cement (PC) M.030 kg 9.8000 1,000 9,800
3 Pasir Pasang M.003 m3 0.0215 100,000 2,150
4 Portland Cement (PC) Warna M.030.a kg 1.3000 16,000 20,800
Jumlah Harga Bahan 63,935
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.9000 70,000 63,000
2 Tukang L.02 OH 0.4500 85,000 38,250
3 Kepala Tukang L.03 OH 0.0450 90,000 4,050
4 Mandor L.04 OH 0.0450 100,000 4,500
Jumlah Tenaga Kerja 109,800
B Bahan
1 Keramik Dinding 20 x 40 cm M.192.m bh 12.0000 5,000 60,000
2 Portland Cement (PC) M.030 kg 9.3000 1,000 9,300
3 Pasir Pasang M.003 m3 0.0180 100,000 1,800
4 Portland Cement (PC) Warna M.030.a kg 1.5000 16,000 24,000
Jumlah Harga Bahan 95,100
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5000 70,000 35,000
2 Tukang Batu L.02 OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0250 100,000 2,500
Jumlah Tenaga Kerja 61,000
B Bahan
1 Pasir Pasang M.003 m3 0.0350 100,000 3,500
2,100
5,950
630
400
9,080
43,815
286
44,101
-
53,181
-
53,181
8,400
10,200
1,080
600
20,280
486,464
1,428
487,892
-
508,172
-
508,172
8,400
10,200
1,080
600
20,280
235,124
1,428
236,552
-
256,832
-
256,832
7,000
8,500
900
500
16,900
60,808
1,428
62,236
-
79,136
-
79,136
7,000
8,500
900
500
16,900
29,081
857
29,938
-
46,838
-
46,838
56,000
68,000
7,200
4,000
135,200
22,500
286
22,786
-
157,986
-
157,986
7,000
4,250
450
500
12,200
34,580
2,129
36,709
-
48,909
-
48,909
35,000
42,500
4,500
2,500
84,500
139,680
4,348
1,949
82,500
228,476
-
312,976
-
312,976
3,500
4,250
450
300
8,500
24,971
194
25,164
-
33,664
-
33,664
2,599
5,950
630
400
9,579
31,680
194
31,874
41,452
-
41,452
2,100
5,950
630
400
9,080
34,210
194
34,404
43,484
-
43,484
2,100
5,950
630
400
9,080
30,470
194
30,664
39,744
-
39,744
2,100
5,950
630
400
9,080
27,414
194
27,607
36,687
-
36,687
7,000
8,500
900
500
16,900
765,020
968
765,988
782,888
-
782,888
7,000
8,500
900
500
16,900
831,405
968
832,373
849,273
-
849,273
7,000
8,500
900
500
16,900
215,018
968
215,986
232,886
-
232,886
7,000
8,500
900
500
16,900
279,525
968
280,493
297,393
-
297,393
7,000
8,500
900
500
16,900
374,356
968
375,324
392,224
-
392,224
7,000
8,500
900
500
16,900
139,762
968
140,729
157,629
-
157,629
14,000
51,000
5,400
1,000
71,400
585,396
194
1,500
587,090
658,490
-
658,490
14,000
51,000
5,400
1,000
71,400
401,363
194
1,500
403,057
474,457
-
474,457
42,000
8,500
900
300
51,700
#N/A
581
#N/A
#N/A
#N/A
#N/A
12,600
27,200
2,880
900
43,580
209,702
1,161
27,414
238,277
281,857
-
281,857
12,600
27,200
2,880
900
43,580
168,715
1,161
27,414
197,290
240,870
-
240,870
12,600
27,200
2,880
900
43,580
168,715
1,161
27,414
197,290
240,870
-
240,870
12,600
27,200
2,880
900
43,580
108,745
1,161
27,414
137,320
180,900
-
180,900
12,600
27,200
2,880
900
43,580
108,745
1,161
27,414
137,320
180,900
-
180,900
18,900
34,000
3,600
1,350
57,850
401,929
1,161
86,007
489,098
546,948
-
546,948
18,900
34,000
3,600
1,350
57,850
323,371
1,161
86,007
410,540
468,390
-
468,390
18,900
34,000
3,600
1,350
57,850
301,016
1,161
86,007
388,184
446,034
-
446,034
18,900
34,000
3,600
1,350
57,850
208,427
1,161
86,007
295,596
353,446
-
353,446
18,900
34,000
3,600
1,350
57,850
173,065
1,161
86,007
260,234
318,084
-
318,084
18,200
34,000
3,600
1,300
57,100
401,929
1,161
1,330,249
1,733,339
1,790,439
-
1,790,439
18,200
34,000
3,600
1,300
57,100
323,371
1,161
1,330,249
1,654,781
1,711,881
-
1,711,881
18,200
34,000
3,600
1,300
57,100
301,016
1,161
265,719
567,896
624,996
-
624,996
18,200
34,000
3,600
1,300
57,100
208,427
1,161
265,719
475,307
532,407
-
532,407
18,200
34,000
3,600
1,300
57,100
173,065
1,161
265,719
439,945
497,045
-
497,045
21,700
39,950
4,230
1,550
67,430
471,829
1,161
466,195
939,185
1,006,615
-
1,006,615
21,700
39,950
4,230
1,550
67,430
379,609
1,161
466,195
846,965
914,395
-
914,395
21,700
39,950
4,230
1,550
67,430
353,366
1,161
466,195
820,722
888,152
-
888,152
21,700
39,950
4,230
1,550
67,430
244,675
1,112
466,195
1,730,906
2,442,888
2,510,318
-
2,510,318
21,700
39,950
4,230
1,550
67,430
203,163
1,161
466,195
670,519
737,949
-
737,949
7,000
8,500
900
500
16,900
2,821,712
581
2,822,293
2,839,193
-
2,839,193
56,000
68,000
7,200
4,000
135,200
365,873
194
366,066
501,266
-
501,266
3,500
4,250
450
300
8,500
34,956
3,225
38,181
46,681
-
46,681
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A TenaDa
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0075 90,000 675
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 18,350
B Bahan
1 Genteng Palentong M.150 bh 25.0000 3,800 95,000
Jumlah Harga Bahan 95,000
C Peralatan
Jumlah Harga Alat -
D Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 113,350
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.1 113,350
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 18,395
B Bahan
1 Genteng Kodok M.148 bh 25.0000 7,100 177,500
Jumlah Harga Bahan 177,500
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 195,895
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.2 195,895
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 18,395
B Bahan
1 Genteng Kodok M.149 bh 12.0000 7,400 88,800
Jumlah Harga Bahan 88,800
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 107,195
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.3 107,195
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
1 Genteng Bubung M.146 bh 5.0000 7,105 35,527
2 Semen Portland M.030 Kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 46,727
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 93,727
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.4 93,727
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
1 Genteng Bubung M.146 bh 5.0000 7,105 35,527
2 Semen Portland M.030 Kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 46,727
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 93,727
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.5 93,727
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
1 Genteng Bubung M.146.a bh 4.0000 12,408 49,631
2 Semen Portland M.030 Kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 60,831
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 107,831
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.6 107,831
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0670 85,000 5,695
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 16,825
B Bahan
1 Roof light fibreglass M.139 Lbr 0.6000 55,000 33,000
2 Paku Skrup M.111 Kg 0.0500 20,000 1,000
Jumlah Harga Bahan 34,000
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 50,825
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.7 50,825
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 17,695
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.5000 147,500 73,750
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 75,952
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 93,647
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.8 93,647
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 17,695
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.6000 147,500 88,500
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 90,702
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 108,397
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.9 108,397
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.6000 147,500 88,500
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 90,702
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 107,782
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.10 107,782
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.7500 147,500 110,625
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 112,827
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 129,907
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.11 129,907
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.4200 147,500 61,950
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 64,152
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 81,232
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.13 81,232
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.4400 147,500 64,900
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 67,102
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 84,182
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.14 84,182
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.5100 147,500 75,225
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 77,427
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 94,507
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.15 94,507
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.8000 147,500 118,000
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 120,202
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 137,282
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.16 137,282
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.3700 147,500 54,575
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 56,777
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 73,857
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.17 73,857
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.3800 147,500 56,050
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 58,252
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 75,332
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.18 75,332
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92x250 M.137.a Lbr 0.4600 147,500 67,850
2 Paku Pancing 6x23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 70,052
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 87,132
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.19 87,132
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.4900 147,500 72,275
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 74,477
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 91,557
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.20 91,557
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 17,080
B Bahan
1 Asbes Gel 92 x 250 M.137.a Lbr 0.5700 147,500 84,075
2 Paku Pancing 6 x 23 M.116 Kg 0.1200 18,347 2,202
Jumlah Harga Bahan 86,277
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 103,357
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.21 103,357
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0840 70,000 5,880
2 Tukang Kayu L.02.a OH 0.1250 85,000 10,625
3 Kepala Tukang L.03 OH 0.0130 90,000 1,170
4 Mandor L.04 OH 0.0040 100,000 400
Jumlah Tenaga Kerja 18,075
B Bahan
1 Bubung Stel Gel. M.141 Lbr 2.4000 72,251 173,402
2 Paku Skrup 3,5” M.111.b Bh 6.0000 96,594 579,563
Jumlah Harga Bahan 752,965
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 771,040
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.22 771,040
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0840 70,000 5,880
2 Tukang Kayu L.02.a OH 0.1250 85,000 10,625
3 Kepala Tukang L.03 OH 0.0130 90,000 1,170
4 Mandor L.04 OH 0.0040 100,000 400
Jumlah Tenaga Kerja 18,075
B Bahan
1 Bubung Stel Gel. M.141 Lbr 2.1000 72,251 151,727
2 Paku Skrup 3,5” M.111.b Bh 6.0000 96,594 579,563
Jumlah Harga Bahan 731,290
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 749,365
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.23 749,365
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0840 70,000 5,880
2 Tukang Kayu L.02.a OH 0.1250 85,000 10,625
3 Kepala Tukang L.03 OH 0.0130 90,000 1,170
4 Mandor L.04 OH 0.0040 100,000 400
Jumlah Tenaga Kerja 18,075
B Bahan
1 Bubung Stel Gel. M.141 Lbr 2.0500 72,251 148,114
2 Paku Skrup 3,5” M.111.b Bh 6.0000 96,594 579,563
Jumlah Harga Bahan 727,677
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 745,752
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.24 745,752
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0840 70,000 5,880
2 Tukang Kayu L.02.a OH 0.1250 85,000 10,625
3 Kepala Tukang L.03 OH 0.0130 90,000 1,170
4 Mandor L.04 OH 0.0040 100,000 400
Jumlah Tenaga Kerja 18,075
B Bahan
1 Nok Paten 92cm M.208 Lbr 1.2000 63,646 76,375
2 Paku Skrup 3,5” M.111.b bh 6.0000 96,594 579,563
Jumlah Harga Bahan 655,938
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 674,013
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.25 674,013
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0840 70,000 5,880
2 Tukang Kayu L.02.a OH 0.1250 85,000 10,625
3 Kepala Tukang L.03 OH 0.0130 90,000 1,170
4 Mandor L.04 OH 0.0040 100,000 400
Jumlah Tenaga Kerja 18,075
B Bahan
1 Nok Paten 92cm M.208 Lbr 1.2000 63,646 76,375
2 Paku Skrup 3,5” M.111.b bh 6.0000 96,594 579,563
Jumlah Harga Bahan 655,938
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 674,013
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.26 674,013
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0840 70,000 5,880
2 Tukang Kayu L.02.a OH 0.1250 85,000 10,625
3 Kepala Tukang L.03 OH 0.0130 90,000 1,170
4 Mandor L.04 OH 0.0040 100,000 400
Jumlah Tenaga Kerja 18,075
B Bahan
1 Nok Paten 92cm M.208 Lbr 1.2000 63,646 76,375
2 Paku Skrup 3,5” M.111.b bh 6.0000 96,594 579,563
Jumlah Harga Bahan 655,938
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 0% 674,013
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.27 674,013
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1500 85,000 12,750
3 Kepala Tukang L.03 OH 0.0130 90,000 1,170
4 Mandor L.04 OH 0.0040 100,000 400
Jumlah Tenaga Kerja 21,320
B Bahan
1 Nok Paten 92cm M.208 Lbr 1.1000 63,646 70,010
2 Paku Skrup 3,5” M.111.b bh 6.0000 96,594 579,563
Jumlah Harga Bahan 649,574
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 670,894
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.28 670,894
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0840 70,000 5,880
2 Tukang Kayu L.02.a OH 0.1250 85,000 10,625
3 Kepala Tukang L.03 OH 0.0130 90,000 1,170
4 Mandor L.04 OH 0.0040 100,000 400
Jumlah Tenaga Kerja 18,075
B Bahan
1 Nok Paten 92cm M.208 Lbr 1.1000 63,646 70,010
2 Paku Skrup 3,5” M.111.b bh 6.0000 96,594 579,563
Jumlah Harga Bahan 649,574
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 667,649
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.29 667,649
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 24,400
B Bahan
1 Genteng Beton M.144 bh 11.0000 6,800 74,800
2 Paku Biasa 2"-5" M.110.b kg 0.0300 19,358 581
Jumlah Harga Bahan 75,381
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 99,781
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.30 99,781
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Kayu L.02.a OH 0.3000 85,000 25,500
3 Kepala Tukang L.03 OH 0.0030 90,000 270
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 40,770
B Bahan
1 Genteng Aspal M.145 bh 6.9000 10,181 70,248
2 Plywood 6mm M.130.b Lbr 0.3500 229,353 80,274
3 Paku Biasa ½”-1” M.110.a Kg 0.0300 19,884 597
4 Plastic Aerator M.321 bh 0.5000 10,340 5,170
Jumlah Harga Bahan 156,288
C Peralatan
Jumlah Harga AlatT -
D Jumlah (A+B+C) 197,058
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.31 197,058
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0010 100,000 100
Jumlah Tenaga Kerja 23,500
B Bahan
1 Genteng Metal M.151 bh 1.3000 163,000 211,900
2 Paku Biasa ½”-1” M.110.a Kg 0.2000 19,884 3,977
Jumlah Harga Bahan 215,877
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 239,377
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.32 239,377
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0010 100,000 100
Jumlah Tenaga Kerja 23,500
B Bahan
1 Gentang Metal M.151 bh 2.0000 163,000 326,000
2 Paku Biasa ½”-1” M.110.a kg 0.2000 19,884 3,977
Jumlah Harga Bahan 329,977
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 353,477
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.33 353,477
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1660 70,000 11,620
2 Tukang Kayu L.02.a OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 35,920
B Bahan
1 Sirap Kayu M.147 bh 30.0000 4,300 129,010
2 Paku Biasa ½”-1” M.110.a kg 0.2000 19,884 3,977
Jumlah Harga Bahan 132,987
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 168,907
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.34 168,907
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0200 100,000 2,000
Jumlah Tenaga Kerja 48,800
B Bahan
1 Nok Genteng Beton M.206 bh 3.5000 11,898 41,642
2 Paku Biasa ½”-1” M.110.a Kg 0.0500 19,884 994
3 Semen PC M.030 Kg 10.8000 1,000 10,800
4 Pasir Pasang M.003 m3 0.0320 100,000 3,200
5 Semen Warna M.030.a Kg 1.0000 16,000 16,000
Jumlah Harga Bahan 72,636
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 121,436
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.35 121,436
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1250 70,000 8,750
2 Tukang Kayu L.02.a OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 32,850
B Bahan
1 Nok Genteng Aspal M.205 bh 2.0000 67,516 135,031
2 Paku Biasa ½”-1” M.110.a Kg 0.0500 19,884 994
3 Kayu Balok Borneo M.059 m3 0.0035 13,087,631 45,807
Jumlah Harga Bahan 181,832
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 214,682
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.36 214,682
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Tukang Kayu L.02.a OH 0.1500 85,000 12,750
3 Kepala Tukang L.03 OH 0.0150 90,000 1,350
4 Mandor L.04 OH 0.0130 100,000 1,300
Jumlah Tenaga Kerja 32,900
B Bahan
1 Nok Genteng Metal M.207 bh 1.1000 150,514 165,565
2 Paku Biasa ½”-1” M.110.a Kg 0.0500 19,884 994
Jumlah Harga Bahan 166,559
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 199,459
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.37 199,459
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1250 70,000 8,750
2 Tukang Kayu L.02.a OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 32,850
B Bahan
1 Seng Pelat 3" x 6" M.134.b Lbr 0.4000 68,084 27,234
2 Paku Biasa ½" - 1" M.110.a Kg 0.0500 19,884 994
3 Paku Biasa 2" - 5" M.110.b Kg 0.0500 19,358 968
Jumlah Harga Bahan 29,196
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 62,046
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.38 62,046
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1200 70,000 8,400
2 Tukang Kayu L.02.a OH 0.0600 85,000 5,100
3 Kepala Tukang L.03 OH 0.0060 90,000 540
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 14,640
B Bahan
1 Seng Gel 3” x 6” M.135.b Lbr 0.7000 204,252 142,977
2 Paku Biasa ½” - 1” M.110.a Kg 0.0200 19,884 398
Jumlah Harga Bahan 143,374
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 158,014
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.39 158,014
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 17,680
B Bahan
1 Seng Pelat 3” x 6” BJLS 28 M.134.c Lbr 0.3000 68,084 20,425
2 Paku Biasa ½”-1” M.110.a Kg 0.0400 19,884 795
Jumlah Harga Bahan 21,221
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 38,901
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.40 38,901
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0800 90,000 7,200
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 82,050
B Bahan
1 Alumunium Gel Tebal 0,55 M.089 Lbr 1.0500 190,890 200,435
2 Paku Hak Panjang 15cm M.117 Kg 0.0200 18,347 367
Jumlah Harga Bahan 200,801
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 282,851
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.41 282,851
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 1.0000 85,000 85,000
3 Kepala Tukang L.03 OH 0.1000 90,000 9,000
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 106,000
B Bahan
1 Nok Standar 40 x 18 M.209 bh 1.2000 15,908 19,089
2 Paku Hak Panjang 15cm M.117 Kg 0.0400 18,347 734
Jumlah Harga Bahan 19,823
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 125,823
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.42 125,823
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0500 85,000 4,250
3 Kepala Tukang L.03 OH 0.0050 90,000 450
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 16,000
B Bahan
1 Alumunium Foil M.090 m2 1.0500 47,829 50,220
Jumlah Harga Bahan 50,220
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 66,220
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) A.4.5.2.43 66,220
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02 OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 18,395
B Bahan
1 Genteng Biasa ex. Malang M.144.a bh 25.0000 2,000 50,000
Jumlah Harga Bahan 50,000
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 18,395
B Bahan
1 Genteng Press ex. Trenggalek M.144.c bh 25.0000 4,375 109,364
Jumlah Harga Bahan 109,364
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 18,395
B Bahan
1 Genteng Karang Pilang ex. Malang M.144.c bh 25.0000 4,375 109,364
Jumlah Harga Bahan 109,364
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 18,395
B Bahan
Genteng Karang Pilang ex.
1 Trenggalek M.144.d bh 25.0000 4,375 109,364
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 18,395
B Bahan
1 Genteng Karang Pilang ex. Surabaya M.144.e bh 25.0000 5,833 145,819
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
1 Bubung Genteng Biasa ex. Malang M.141.c bh 5.0000 3,394 16,968
2 Portland Cement (PC) M.030 kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 28,168
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
Bubung Genteng Biasa ex.
1 Trenggalek M.141.d bh 5.0000 5,196 25,982
2 Portland Cement (PC) M.030 kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 37,182
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
Bubung Genteng Karang Pilang Ex.
1 Malang M.141.e bh 5.0000 7,211 36,057
2 Portland Cement (PC) M.030 kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 47,257
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
1 Bubung Genteng Karangpilang Ex. M.141.f bh 5.0000 7,700 38,500
Trenggalek
2 Portland Cement (PC) M.030 kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 49,700
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
Bubung Genteng Karangpilang Ex.
1 Surabaya M.141.g bh 5.0000 10,366 51,832
2 Portland Cement (PC) M.030 kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 63,032
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0750 85,000 6,375
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 18,395
B Bahan
1 Genteng Palentong Kecil M.150 bh 25.0000 3,800 95,000
2 Portland Cement (PC) M.030 kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 106,200
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0010 100,000 100
Jumlah Tenaga Kerja 23,500
B Bahan
1 Genteng Metal M.151 bh 1.0200 163,000 166,260
2 Paku M.109 kg 0.2000 19,354 3,871
Jumlah Harga Bahan 170,131
C Peralatan
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
1 Bubung Genteng Palentong Kecil M.141.h bh 5.0000 6,800 34,000
2 Portland Cement (PC) M.030 kg 8.0000 1,000 8,000
3 Pasir Pasang M.003 m3 0.0320 100,000 3,200
Jumlah Harga Bahan 45,200
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.4000 70,000 28,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0020 100,000 200
Jumlah Tenaga Kerja 47,000
B Bahan
1 Bubung Genteng Beton M.141.i bh 3.5000 12,302 43,056
2 Paku M.109 kg 0.0500 19,354 968
3 Portland Cement (PC) M.030 kg 10.8000 1,000 10,800
4 Pasir Pasang M.003 m3 0.0320 100,000 3,200
5 Portland Cement (PC) Warna M.030.a kg 1.0000 16,000 16,000
Jumlah Harga Bahan 74,024
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1250 70,000 8,750
2 Tukang Kayu L.02.a OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 32,850
B Bahan
1 Bubung Genteng Aspal M.141.j bh 2.0000 67,872 135,744
2 Paku M.109 kg 0.0500 19,354 968
3 Balok Kayu M.057 m3 0.0035 8,585,000 30,048
Jumlah Harga Bahan 166,759
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Tukang Kayu L.02.a OH 0.1500 85,000 12,750
3 Kepala Tukang L.03 OH 0.0150 90,000 1,350
4 Mandor L.04 OH 0.0130 100,000 1,300
Jumlah Tenaga Kerja 32,900
B Bahan
1 Bubung Genteng Metal M.141.k bh 1.1000 150,591 165,650
2 Paku M.109 kg 0.0500 19,354 968
Jumlah Harga Bahan 166,618
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1250 70,000 8,750
2 Tukang Kayu L.02.a OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 32,850
B Bahan
1 Seng plat BJLS 28 (90 x 180) cm M.134.f lbr 0.4000 101,808 40,723
2 Paku M.109 kg 0.1100 19,354 2,129
3 Papan (3x30) cm M.068.b m3 0.0040 24,391,500 97,566
Jumlah Harga Bahan 140,418
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.0700 85,000 5,950
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 17,770
B Bahan
1 Bubung Seng Gelombang M.141.l lbr 0.3000 124,079 37,224
2 Paku seng M.115 kg 0.0400 21,000 840
Jumlah Harga Bahan 38,064
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 1.0000 85,000 85,000
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 93,900
B Bahan
1 Bubung Seng Gelombang M.141.l lbr 0.3000 124,079 37,224
2 Paku seng M.115 kg 0.0400 21,000 840
Jumlah Harga Bahan 38,064
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1400 70,000 9,800
2 Tukang Kayu L.02.a OH 0.0670 85,000 5,695
3 Kepala Tukang L.03 OH 0.0070 90,000 630
4 Mandor L.04 OH 0.0070 100,000 700
Jumlah Tenaga Kerja 16,825
B Bahan
1 Atap Polycarbonat M.147.b m2 1.1000 318,150 349,965
2 Paku seng M.115 kg 10.0000 21,000 210,000
Jumlah Harga Bahan 559,965
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.7500 85,000 63,750
3 Kepala Tukang L.03 OH 0.0080 90,000 720
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 75,570
B Bahan
1 Atap Seng Galvalum M.147.c m2 1.0500 174,300 183,015
2 Paku seng M.115 kg 0.0200 21,000 420
Jumlah Harga Bahan 183,435
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 1.0000 85,000 85,000
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 93,900
B Bahan
1 Bubung Atap Seng Galvalum M.141.n m2 1.2000 - -
2 Paku seng M.115 kg 0.0400 21,000 840
Jumlah Harga Bahan 840
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 7.0000 70,000 490,000
2 Tukang Kayu L.02 OH 21.0000 85,000 1,785,000
3 Kepala Tukang L.03 OH 2.1000 90,000 189,000
4 Mandor L.04 OH 0.3500 100,000 35,000
Jumlah Tenaga Kerja 2,499,000
B Bahan
1 Balok Kayu Kelas III M.058.a m3 1.1000 1,500,000 1,650,000
2 Paku 10 cm M.109.l kg 1.2500 19,354 24,193
3 Lem Kayu M.247 kg 1.0000 64,500 64,500
Jumlah Harga Bahan 1,738,693
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.0000 70,000 420,000
2 Tukang Kayu L.02 OH 18.0000 85,000 1,530,000
3 Kepala Tukang L.03 OH 1.8000 90,000 162,000
4 Mandor L.04 OH 0.3000 100,000 30,000
Jumlah Tenaga Kerja 2,142,000
B Bahan
1 Balok Kayu Kelas I M.057.c m3 1.2000 22,005,375 26,406,450
2 Paku 10 cm M.109.l kg 1.2500 19,354 24,193
3 Lem Kayu M.247 kg 1.0000 64,500 64,500
Jumlah Harga Bahan 26,495,143
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.0000 70,000 420,000
2 Tukang Kayu L.02 OH 18.0000 85,000 1,530,000
3 Kepala Tukang L.03 OH 1.8000 90,000 162,000
4 Mandor L.04 OH 0.3000 100,000 30,000
Jumlah Tenaga Kerja 2,142,000
B Bahan
1 Balok Kayu Kelas II M.058 m3 1.2000 1,500,000 1,800,000
2 Paku 10 cm M.109.l kg 1.2500 19,354 24,193
3 Lem Kayu M.247 kg 1.0000 64,500 64,500
Jumlah Harga Bahan 1,888,693
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.0000 70,000 420,000
2 Tukang Kayu L.02.a OH 18.0000 85,000 1,530,000
3 Kepala Tukang L.03 OH 1.8000 90,000 162,000
4 Mandor L.04 OH 0.3000 100,000 30,000
Jumlah Tenaga Kerja 2,142,000
B Bahan
1 Balok Kayu Kelas III M.058.a m3 1.2000 1,500,000 1,800,000
2 Paku 10 cm M.109.l kg 1.2500 19,354 24,193
3 Lem Kayu M.247 kg 1.0000 64,500 64,500
Jumlah Harga Bahan 1,888,693
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3500 70,000 24,500
2 Tukang Kayu L.02.a OH 1.0500 85,000 89,250
3 Kepala Tukang L.03 OH 0.1050 90,000 9,450
4 Mandor L.04 OH 0.0180 100,000 1,800
Jumlah Tenaga Kerja 125,000
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0400 22,005,375 880,215
2 Paku 5-7 cm M.109.c kg 0.0500 19,354 968
Jumlah Harga Bahan 881,183
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3500 70,000 24,500
2 Tukang Kayu L.02.a OH 1.0500 85,000 89,250
3 Kepala Tukang L.03 OH 0.1050 90,000 9,450
4 Mandor L.04 OH 0.0180 100,000 1,800
Jumlah Tenaga Kerja 125,000
B Bahan
1 Kayu Papan kelas III M.067 m3 0.0400 1,500,000 60,000
2 Paku 5-7 cm M.109.c kg 0.0500 19,354 968
Jumlah Harga Bahan 60,968
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3500 70,000 24,500
2 Tukang Kayu L.02.a OH 1.0500 85,000 89,250
3 Kepala Tukang L.03 OH 0.1050 90,000 9,450
4 Mandor L.04 OH 0.0180 100,000 1,800
Jumlah Tenaga Kerja 125,000
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0400 22,005,375 880,215
2 Paku 5-7 cm M.109.c kg 0.0500 19,354 968
Jumlah Harga Bahan 881,183
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 70,000 70,000
2 Tukang Kayu L.02.a OH 3.0000 85,000 255,000
3 Kepala Tukang L.03 OH 0.3000 90,000 27,000
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 357,000
B Bahan
1 Kayu Papan kelas III M.067 m3 0.0400 1,500,000 60,000
2 Lem Kayu M.247 kg 0.5000 64,500 32,250
Jumlah Harga Bahan 92,250
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 70,000 70,000
2 Tukang Kayu L.02.a OH 3.0000 85,000 255,000
3 Kepala Tukang L.03 OH 0.3000 90,000 27,000
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 357,000
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0240 22,005,375 528,129
2 Lem Kayu M.247 kg 0.3000 64,500 19,350
Jumlah Harga Bahan 547,479
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan Kelas II M.066 m3 0.0240 14,436,799 346,483
2 Lem Kayu M.247 kg 0.3000 64,500 19,350
Jumlah Harga Bahan 365,833
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan kelas III M.067 m3 0.0240 1,500,000 36,000
2 Lem Kayu M.247 kg 0.3000 64,500 19,350
Jumlah Harga Bahan 55,350
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0640 22,005,375 1,408,344
2 Lem Kayu M.247 kg 0.5000 64,500 32,250
Jumlah Harga Bahan 1,440,594
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0640 22,005,375 1,408,344
2 Lem Kayu M.247 kg 0.5000 64,500 32,250
Jumlah Harga Bahan 1,440,594
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 70,000 70,000
2 Tukang Kayu L.02.a OH 3.0000 85,000 255,000
3 Kepala Tukang L.03 OH 0.3000 90,000 27,000
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 357,000
B Bahan
1 Kayu Papan kelas III M.067 m3 0.0640 1,500,000 96,000
2 Lem Kayu M.247 kg 0.5000 64,500 32,250
Jumlah Harga Bahan 128,250
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 70,000 49,000
2 Tukang Kayu L.02.a OH 2.1000 85,000 178,500
3 Kepala Tukang L.03 OH 0.2100 90,000 18,900
4 Mandor L.04 OH 0.0350 100,000 3,500
Jumlah Tenaga Kerja 249,900
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0250 22,005,375 550,134
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.5000 64,500 32,250
Plywood Tebal 4 mm Ukuran
4 M.131 lbr 1.0000 110,292 110,292
(90x220) cm
Jumlah Harga Bahan 693,261
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 70,000 49,000
2 Tukang Kayu L.02.a OH 2.1000 85,000 178,500
3 Kepala Tukang L.03 OH 0.2100 90,000 18,900
4 Mandor L.04 OH 0.0350 100,000 3,500
Jumlah Tenaga Kerja 249,900
B Bahan
1 Kayu Papan kelas II M.066 m3 0.0250 14,436,799 360,920
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.5000 64,500 32,250
Plywood Tebal 4 mm Ukuran
4 M.131 lbr 1.0000 110,292 110,292
(90x220) cm
Jumlah Harga Bahan 504,047
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 70,000 49,000
2 Tukang Kayu L.02.a OH 2.1000 85,000 178,500
3 Kepala Tukang L.03 OH 0.2100 90,000 18,900
4 Mandor L.04 OH 0.0350 100,000 3,500
Jumlah Tenaga Kerja 249,900
B Bahan
1 Kayu Papan kelas III M.067 m3 0.0250 1,500,000 37,500
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.5000 64,500 32,250
Plywood Tebal 4 mm Ukuran
4 M.131 lbr 1.0000 110,292 110,292
(90x220) cm
Jumlah Harga Bahan 180,627
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0256 22,005,375 563,338
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.5000 64,500 32,250
Plywood Tebal 4 mm Ukuran
4 (90x220) cm M.131 lbr 1.0000 110,292 110,292
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan kelas II M.065 m3 0.0256 22,005,375 563,338
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.5000 64,500 32,250
Plywood Tebal 4 mm Ukuran
4 M.131 lbr 1.0000 110,292 110,292
(90x220) cm
Jumlah Harga Bahan 706,465
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan kelas III M.067 m3 0.0256 1,500,000 38,400
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.5000 64,500 32,250
Plywood Tebal 4 mm Ukuran
4 (90x220) cm M.131 lbr 1.0000 110,292 110,292
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6700 70,000 46,900
2 Tukang Kayu L.02.a OH 2.0000 85,000 170,000
3 Kepala Tukang L.03 OH 0.2000 90,000 18,000
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 268,400
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0600 22,005,375 1,320,323
2 Paku 1 cm - 2,5 cm M.109.a kg 0.1500 19,501 2,925
Jumlah Harga Bahan 1,323,248
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6700 70,000 46,900
2 Tukang Kayu L.02.a OH 2.0000 85,000 170,000
3 Kepala Tukang L.03 OH 0.2000 90,000 18,000
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 268,400
B Bahan
1 Kayu Papan Kelas II M.066 m3 0.0600 14,436,799 866,208
2 Paku 1 cm - 2,5 cm M.109.a kg 0.1500 19,501 2,925
Jumlah Harga Bahan 869,133
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6700 70,000 46,900
2 Tukang Kayu L.02.a OH 2.0000 85,000 170,000
3 Kepala Tukang L.03 OH 0.2000 90,000 18,000
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 268,400
B Bahan
1 Kayu Papan Kelas III M.067 m3 0.0600 1,500,000 90,000
2 Paku 1 cm - 2,5 cm M.109.a kg 0.1500 19,501 2,925
Jumlah Harga Bahan 92,925
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0250 22,005,375 550,134
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.3000 64,500 19,350
4 Teakwood 4 mm, 90 x 220 M.132 lbr 1.0000 147,500 147,500
Jumlah Harga Bahan 717,569
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan Kelas II M.066 m3 0.0250 14,436,799 360,920
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.3000 64,500 19,350
4 Teakwood 4 mm, 90 x 220 M.132 lbr 1.0000 147,500 147,500
Jumlah Harga Bahan 528,355
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Kayu Papan kelas III M.067 m3 0.0250 1,500,000 37,500
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.3000 64,500 19,350
4 Teakwood 4 mm, 90 x 220 M.132 lbr 1.0000 147,500 147,500
Jumlah Harga Bahan 204,935
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Kayu Papan kelas I M.065 m3 0.0250 22,005,375 550,134
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Teakwood 4 mm, 90 x 220 M.132 lbr 1.0000 147,500 147,500
5 Formika M.326 lbr 0.5000 267,776 133,888
Jumlah Harga Bahan 883,708
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Kayu Papan kelas II M.066 m3 0.0250 14,436,799 360,920
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Teakwood 4 mm, 90 x 220 M.132 lbr 1.0000 147,500 147,500
5 Formika M.326 lbr 0.5000 267,776 133,888
Jumlah Harga Bahan 694,493
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Kayu Papan kelas III M.067 m3 0.0250 1,500,000 37,500
2 Paku 1 cm - 2,5 cm M.109.a kg 0.0300 19,501 585
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Teakwood 4 mm, 90 x 220 M.132 lbr 1.0000 147,500 147,500
5 Formika M.326 lbr 0.5000 267,776 133,888
Jumlah Harga Bahan 371,073
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 4.0000 70,000 280,000
2 Tukang Kayu L.02.a OH 12.0000 85,000 1,020,000
3 Kepala Tukang L.03 OH 1.2000 90,000 108,000
4 Mandor L.04 OH 0.2000 100,000 20,000
Jumlah Tenaga Kerja 1,428,000
B Bahan
1 Balok kayu 8/12 M.057.e m3 1.1000 22,005,375 24,205,913
2 Besi Strip tebal 5 mm M.040.b kg 15.0000 15,132 226,984
3 Paku 12 cm M.109.m bh 5.6000 17,697 99,104
Jumlah Harga Bahan 24,532,000
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 4.0000 70,000 280,000
2 Tukang Kayu L.02.a OH 12.0000 85,000 1,020,000
3 Kepala Tukang L.03 OH 1.2000 90,000 108,000
4 Mandor L.04 OH 0.2000 100,000 20,000
Jumlah Tenaga Kerja 1,428,000
B Bahan
1 Balok kayu 8/12 M.057.h m3 1.1000 14,436,799 15,880,478
2 Besi Strip tebal 5 mm M.040.b kg 15.0000 15,132 226,984
3 Paku 12 cm M.109.m bh 5.6000 17,697 99,104
Jumlah Harga Bahan 16,206,566
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 4.0000 70,000 280,000
2 Tukang Kayu L.02.a OH 12.0000 85,000 1,020,000
3 Kepala Tukang L.03 OH 1.2000 90,000 108,000
4 Mandor L.04 OH 0.2000 100,000 20,000
Jumlah Tenaga Kerja 1,428,000
B Bahan
1 Balok kayu 8/12 M.057.k m3 1.1000 8,436,914 9,280,605
2 Besi Strip tebal 5 mm M.040.b kg 15.0000 15,132 226,984
3 Paku 12 cm M.109.m bh 5.6000 17,697 99,104
Jumlah Harga Bahan 9,606,693
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.7000 70,000 469,000
2 Tukang Kayu L.02.a OH 20.1000 85,000 1,708,500
3 Kepala Tukang L.03 OH 2.0100 90,000 180,900
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 2,391,900
B Bahan
1 Balok kayu 8/12 M.057.e m3 1.2000 22,005,375 26,406,450
2 Besi Strip tebal 5 mm M.040.b kg 15.0000 15,132 226,984
3 Paku 12 cm M.109.m bh 5.6000 17,697 99,104
Jumlah Harga Bahan 26,732,538
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.7000 70,000 469,000
2 Tukang Kayu L.02.a OH 20.1000 85,000 1,708,500
3 Kepala Tukang L.03 OH 2.0100 90,000 180,900
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 2,391,900
B Bahan
1 Balok kayu 8/12 M.057.h m3 1.2000 14,436,799 17,324,158
2 Besi Strip tebal 5 mm M.040.b kg 15.0000 15,132 226,984
3 Paku 12 cm M.109.m bh 5.6000 17,697 99,104
Jumlah Harga Bahan 17,650,246
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.7000 70,000 469,000
2 Tukang Kayu L.02.a OH 20.1000 85,000 1,708,500
3 Kepala Tukang L.03 OH 2.0100 90,000 180,900
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 2,391,900
B Bahan
1 Balok kayu 8/12 M.057.k m3 1.2000 8,436,914 10,124,297
2 Besi Strip tebal 5 mm M.040.b kg 15.0000 15,132 226,984
3 Paku 12 cm M.109.m bh 5.6000 17,697 99,104
Jumlah Harga Bahan 10,450,384
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.7000 70,000 469,000
2 Tukang Kayu L.02.a OH 20.1000 85,000 1,708,500
3 Kepala Tukang L.03 OH 2.0100 90,000 180,900
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 2,391,900
B Bahan
1 Balok kayu 8/12 M.057.e m3 1.1000 22,005,375 24,205,913
2 Besi Strip tebal 5 mm M.040.b kg 15.0000 15,132 226,984
3 Paku 12 cm M.109.m bh 3.0000 17,697 53,091
Jumlah Harga Bahan 24,485,988
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.7000 70,000 469,000
2 Tukang Kayu L.02.a OH 20.1000 85,000 1,708,500
3 Kepala Tukang L.03 OH 2.0100 90,000 180,900
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 2,391,900
B Bahan
1 Balok kayu 8/12 M.057.e m3 1.1000 22,005,375 24,205,913
2 Besi Strip tebal 5 mm M.040.b kg 15.0000 15,132 226,984
3 Paku 12 cm M.109.m bh 3.0000 17,697 53,091
Jumlah Harga Bahan 24,485,988
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.7000 70,000 469,000
2 Tukang Kayu L.02.a OH 20.1000 85,000 1,708,500
3 Kepala Tukang L.03 OH 2.0100 90,000 180,900
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 2,391,900
B Bahan
1 Balok kayu 8/12 M.057.e m3 1.1000 22,005,375 24,205,913
2 Besi Strip tebal 5 mm M.040.b kg 15.0000 15,132 226,984
3 Paku 12 cm M.109.m bh 3.0000 17,697 53,091
Jumlah Harga Bahan 24,485,988
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Kayu Kaso 5 x 7 cm Kelas II M.063.b m3 0.0140 14,436,799 202,115
2 Reng 2 x 3 cm M.124 m3 0.0360 10,445,925 376,053
3 Paku 5 dan 10 cm M.109.g kg 0.2500 19,354 4,839
Jumlah Harga Bahan 583,007
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Kayu Kaso 5 x 7 cm Kelas III M.063.c m3 0.0140 8,436,914 118,117
2 Reng 2 x 3 cm M.124 m3 0.0360 10,445,925 376,053
3 Paku 5 dan 10 cm M.109.g kg 0.2500 19,354 4,839
Jumlah Harga Bahan 499,009
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Kayu Kaso 5 X 7 cm Kelas I M.063.a m3 0.0140 22,005,375 308,075
2 Reng 3 x 4 cm M.124.a m3 0.0570 10,445,925 595,418
3 Paku 5 dan 10 cm M.109.g kg 0.2500 19,354 4,839
Jumlah Harga Bahan 908,332
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Kayu Kaso 5 x 7 cm Kelas II M.063.b m3 0.0140 14,436,799 202,115
2 Reng 3 x 4 cm M.124.a m3 0.0570 10,445,925 595,418
3 Paku 5 dan 10 cm M.109.g kg 0.2500 19,354 4,839
Jumlah Harga Bahan 802,371
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Kayu Kaso 5 x 7 cm Kelas III M.063.c m3 0.0140 8,436,914 118,117
2 Reng 3 x 4 cm M.124.a m3 0.0570 10,445,925 595,418
3 Paku 5 dan 10 cm M.109.g kg 0.2500 19,354 4,839
Jumlah Harga Bahan 718,373
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1200 70,000 8,400
2 Tukang Kayu L.02.a OH 0.1200 85,000 10,200
3 Kepala Tukang L.03 OH 0.0120 90,000 1,080
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 20,280
B Bahan
1 Kayu kelas I M.060.a m3 0.0140 22,005,375 308,075
2 Paku 5 dan 10 cm M.109.g kg 0.0570 19,354 1,103
Jumlah Harga Bahan 309,178
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1200 70,000 8,400
2 Tukang Kayu L.02.a OH 0.1200 85,000 10,200
3 Kepala Tukang L.03 OH 0.0120 90,000 1,080
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 20,280
B Bahan
1 Kayu kelas III M.063.c m3 0.0140 8,436,914 118,117
2 Paku 5 dan 10 cm M.109.g kg 0.0570 19,354 1,103
Jumlah Harga Bahan 119,220
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.3000 85,000 25,500
3 Kepala Tukang L.03 OH 0.0300 90,000 2,700
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 46,200
B Bahan
1 Kayu Kaso 5 X 7 cm Kelas I M.063.a m3 0.0154 22,005,375 338,883
2 Paku 7cm - 10 cm M.109.j kg 0.2000 18,262 3,652
Jumlah Harga Bahan 342,535
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.3000 85,000 25,500
3 Kepala Tukang L.03 OH 0.0300 90,000 2,700
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 46,200
B Bahan
1 Kayu Kaso 5 x 7 cm Kelas III M.063.c m3 0.0154 8,436,914 129,928
2 Paku 7cm - 10 cm M.109.j kg 0.2000 18,262 3,652
Jumlah Harga Bahan 133,581
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Kayu L.02.a OH 0.3000 85,000 25,500
3 Kepala Tukang L.03 OH 0.0300 90,000 2,700
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 43,200
B Bahan
1 Kayu Kaso 5 X 7 cm Kelas I M.063.a m3 0.0163 22,005,375 358,688
2 Paku 7cm - 10 cm M.109.j kg 0.2500 18,262 4,566
Jumlah Harga Bahan 363,253
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Kayu L.02.a OH 0.3000 85,000 25,500
3 Kepala Tukang L.03 OH 0.0300 90,000 2,700
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 43,200
B Bahan
1 Kayu Kaso 5 x 7 cm Kelas III M.063.c m3 0.0163 8,436,914 137,522
2 Paku 7cm - 10 cm M.109.j kg 0.2500 18,262 4,566
Jumlah Harga Bahan 142,087
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan 3/20 cm M.068.d m3 0.0108 17,097,911 184,657
2 Paku 5 dan 7 cm M.109.d kg 0.1000 17,763 1,776
Jumlah Harga Bahan 186,434
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan 3/20 cm M.068.g m3 0.0108 10,107,686 109,163
2 Paku 5 dan 7 cm M.109.d kg 0.1000 17,763 1,776
Jumlah Harga Bahan 110,939
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x30) cm M.068.e m3 0.0110 17,475,166 192,227
2 Paku 5 dan 7 cm M.109.d kg 0.0500 17,763 888
Jumlah Harga Bahan 193,115
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x30) cm M.068.c m3 0.0110 16,723,475 183,958
2 Paku 5 dan 7 cm M.109.d kg 0.0500 17,763 888
Jumlah Harga Bahan 184,846
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.4500 85,000 38,250
3 Kepala Tukang L.03 OH 0.0450 90,000 4,050
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 53,600
B Bahan
1 Balok Kayu, 6 x 12 M.057.c m3 0.0280 22,005,375 616,151
2 Paku 5 dan 7 cm M.109.d kg 0.1500 17,763 2,665
Jumlah Harga Bahan 618,815
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Kayu L.02.a OH 0.6000 85,000 51,000
3 Kepala Tukang L.03 OH 0.0600 90,000 5,400
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 71,400
B Bahan
1 Balok Kayu, 6 x 12 M.057.c m3 0.0280 22,005,375 616,151
2 Paku 5 dan 10 cm M.109.g kg 0.1500 19,354 2,903
3 Plywood 4 mm, 120 x 240 M.130.b lbr 0.8600 229,353 197,244
4 Lem Kayu M.247 kg 0.5600 64,500 36,120
Jumlah Harga Bahan 852,417
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 70,000 14,000
2 Tukang Kayu L.02.a OH 0.6000 85,000 51,000
3 Kepala Tukang L.03 OH 0.0600 90,000 5,400
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 71,400
B Bahan
1 Balok Kayu, 6 x 12 M.057.i m3 0.0280 8,436,914 236,234
2 Paku 5 dan 10 cm M.109.g kg 0.1500 19,354 2,903
3 Plywood 4 mm, 120 x 240 M.130.b lbr 0.8600 229,353 197,244
4 Lem Kayu M.247 kg 0.5600 64,500 36,120
Jumlah Harga Bahan 472,501
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6000 70,000 42,000
2 Tukang Kayu L.02.a OH 1.8000 85,000 153,000
3 Kepala Tukang L.03 OH 0.1800 90,000 16,200
4 Mandor L.04 OH 0.0300 100,000 3,000
Jumlah Tenaga Kerja 214,200
B Bahan
1 Kayu Papan Kelas II M.066 m3 0.0070 14,436,799 101,058
2 Paku 5 dan 10 cm M.109.g kg 0.1000 19,354 1,935
3 Paku Skrup 10 cm M.111.d kg 0.1500 226,019 33,903
Jumlah Harga Bahan 136,896
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6000 70,000 42,000
2 Tukang Kayu L.02.a OH 1.8000 85,000 153,000
3 Kepala Tukang L.03 OH 0.1800 90,000 16,200
4 Mandor L.04 OH 0.0300 100,000 3,000
Jumlah Tenaga Kerja 214,200
B Bahan
1 Kayu Papan kelas III M.067 m3 0.0070 1,500,000 10,500
2 Paku 5 dan 10 cm M.109.g kg 0.1000 19,354 1,935
3 Paku Skrup 10 cm M.111.d kg 0.1500 226,019 33,903
Jumlah Harga Bahan 46,338
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.0500 85,000 4,250
3 Kepala Tukang L.03 OH 0.0050 90,000 450
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 12,200
B Bahan
1 Bilik Bambu M.081 m2 1.5000 144,440 216,660
2 Kayu Kaso 5 x 7 cm Kelas II M.063.b m3 0.0140 14,436,799 202,115
3 Paku M.109 kg 0.0120 19,354 232
4 List Kayu 2/4 M.062.a m3 0.0030 5,321,296 15,964
Jumlah Harga Bahan 434,971
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.0000 70,000 420,000
2 Tukang Kayu L.02.a OH 18.0000 85,000 1,530,000
3 Kepala Tukang L.03 OH 1.8000 90,000 162,000
4 Mandor L.04 OH 0.3000 100,000 30,000
Jumlah Tenaga Kerja 2,142,000
B Bahan
1 Balok M.059.t m3 1.2000 14,436,799 17,324,158
2 Paku M.109 kg 1.2500 19,354 24,193
3 Lem Kayu M.247 kg 1.0000 64,500 64,500
Jumlah Harga Bahan 17,412,851
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.0000 70,000 420,000
2 Tukang Kayu L.02.a OH 18.0000 85,000 1,530,000
3 Kepala Tukang L.03 OH 1.8000 90,000 162,000
4 Mandor L.04 OH 0.3000 100,000 30,000
Jumlah Tenaga Kerja 2,142,000
B Bahan
1 Balok M.059.t m3 1.2000 14,436,799 17,324,158
2 Paku M.109 kg 1.2500 19,354 24,193
3 Lem Kayu M.247 kg 1.0000 64,500 64,500
Jumlah Harga Bahan 17,412,851
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3500 70,000 24,500
2 Tukang Kayu L.02.a OH 1.0500 85,000 89,250
3 Kepala Tukang L.03 OH 0.1050 90,000 9,450
4 Mandor L.04 OH 0.0180 100,000 1,800
Jumlah Tenaga Kerja 125,000
B Bahan
1 Papan (3x30) cm M.059.w m3 0.0400 17,475,166 699,007
2 Paku M.109 kg 0.0500 19,354 968
Jumlah Harga Bahan 699,974
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3500 70,000 24,500
2 Tukang Kayu L.02.a OH 1.0500 85,000 89,250
3 Kepala Tukang L.03 OH 0.1050 90,000 9,450
4 Mandor L.04 OH 0.0180 100,000 1,800
Jumlah Tenaga Kerja 125,000
B Bahan
1 Papan (3x30) cm M.059.k m3 0.0400 11,332,797 453,312
2 Paku M.109 kg 0.0500 19,354 968
Jumlah Harga Bahan 454,280
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 70,000 70,000
2 Tukang Kayu L.02.a OH 3.0000 85,000 255,000
3 Kepala Tukang L.03 OH 0.3000 90,000 27,000
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 357,000
B Bahan
1 Papan (3x30) cm M.068.ha m3 0.0640 24,391,500 1,561,056
2 Lem Kayu M.247 kg 0.5000 64,500 32,250
Jumlah Harga Bahan 1,593,306
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 70,000 70,000
2 Tukang Kayu L.02.a OH 3.0000 85,000 255,000
3 Kepala Tukang L.03 OH 0.3000 90,000 27,000
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 357,000
B Bahan
1 Papan (3x30) cm M.059.w m3 0.0640 17,475,166 1,118,411
2 Lem Kayu M.247 kg 0.5000 64,500 32,250
Jumlah Harga Bahan 1,150,661
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 70,000 70,000
2 Tukang Kayu L.02.a OH 3.0000 85,000 255,000
3 Kepala Tukang L.03 OH 0.3000 90,000 27,000
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 357,000
B Bahan
1 Papan (3x30) cm M.059.w m3 0.0640 17,475,166 1,118,411
2 Lem Kayu M.247 kg 0.5000 64,500 32,250
Jumlah Harga Bahan 1,150,661
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 70,000 70,000
2 Tukang Kayu L.02.a OH 3.0000 85,000 255,000
3 Kepala Tukang L.03 OH 0.3000 90,000 27,000
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 357,000
B Bahan
1 Papan (3x30) cm M.059.k m3 0.0640 11,332,797 725,299
2 Lem Kayu M.247 kg 0.5000 64,500 32,250
Jumlah Harga Bahan 757,549
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 70,000 49,000
2 Tukang Kayu L.02.a OH 2.1000 85,000 178,500
3 Kepala Tukang L.03 OH 0.2100 90,000 18,900
4 Mandor L.04 OH 0.0350 100,000 3,500
Jumlah Tenaga Kerja 249,900
B Bahan
1 Papan 2/20 M.068.c m3 0.0250 16,723,475 418,087
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.5000 64,500 32,250
4 Plywood 4 mm, 120 x 240 M.130.b lbr 1.0000 229,353 229,353
Jumlah Harga Bahan 680,271
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 70,000 49,000
2 Tukang Kayu L.02.a OH 2.1000 85,000 178,500
3 Kepala Tukang L.03 OH 0.2100 90,000 18,900
4 Mandor L.04 OH 0.0350 100,000 3,500
Jumlah Tenaga Kerja 249,900
B Bahan
1 Papan (3x30) cm M.059.w m3 0.0250 17,475,166 436,879
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.5000 64,500 32,250
4 Plywood 4 mm, 120 x 240 M.130.b lbr 1.0000 229,353 229,353
Jumlah Harga Bahan 699,063
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 70,000 49,000
2 Tukang Kayu L.02.a OH 2.1000 85,000 178,500
3 Kepala Tukang L.03 OH 0.2100 90,000 18,900
4 Mandor L.04 OH 0.0350 100,000 3,500
Jumlah Tenaga Kerja 249,900
B Bahan
1 Papan (3x30) cm M.059.q m3 0.0250 10,259,418 256,485
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.5000 64,500 32,250
4 Plywood 4 mm, 120 x 240 M.130.b lbr 1.0000 229,353 229,353
Jumlah Harga Bahan 518,669
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6700 70,000 46,900
2 Tukang Kayu L.02.a OH 2.0000 85,000 170,000
3 Kepala Tukang L.03 OH 0.2000 90,000 18,000
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 268,400
B Bahan
1 Papan 2/20 M.068 m3 0.0600 24,391,500 1,463,490
2 Paku M.109 kg 0.1500 19,354 2,903
Jumlah Harga Bahan 1,466,393
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6700 70,000 46,900
2 Tukang Kayu L.02.a OH 2.0000 85,000 170,000
3 Kepala Tukang L.03 OH 0.2000 90,000 18,000
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 268,400
B Bahan
1 Papan (3x30) cm M.059.w m3 0.0600 17,475,166 1,048,510
2 Paku M.109 kg 0.1500 19,354 2,903
Jumlah Harga Bahan 1,051,413
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6700 70,000 46,900
2 Tukang Kayu L.02.a OH 2.0000 85,000 170,000
3 Kepala Tukang L.03 OH 0.2000 90,000 18,000
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 268,400
B Bahan
1 Papan (3x30) cm M.059.w m3 0.0600 17,475,166 1,048,510
2 Paku M.109 kg 0.1500 19,354 2,903
Jumlah Harga Bahan 1,051,413
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6700 70,000 46,900
2 Tukang Kayu L.02.a OH 2.0000 85,000 170,000
3 Kepala Tukang L.03 OH 0.2000 90,000 18,000
4 Mandor L.04 OH 0.3350 100,000 33,500
Jumlah Tenaga Kerja 268,400
B Bahan
1 Papan (3x30) cm M.059.k m3 0.0600 11,332,797 679,968
2 Paku M.109 kg 0.1500 19,354 2,903
Jumlah Harga Bahan 682,871
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Papan 2/20 M.068 m3 0.0250 24,391,500 609,788
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.3000 64,500 19,350
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 1.0000 131,900 131,900
Jumlah Harga Bahan 761,618
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Batang skoor L.40.40.4 M.083 kg 0.0250 29,827 746
2 Sunscreen Aluminium M.140 m2 0.0300 469,945 14,098
3 Lem Kayu M.247 kg 0.3000 64,500 19,350
4 Shock PVC Ø 3 " M.229 bh 1.0000 25,000 25,000
Jumlah Harga Bahan 59,194
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 144,375 5,775
Jumlah Tenaga Kerja 287,375
B Bahan
1 Papan (3x30) cm M.059.w m3 0.0250 17,475,166 436,879
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.3000 64,500 19,350
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 1.0000 131,900 131,900
Jumlah Harga Bahan 588,710
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8000 70,000 56,000
2 Tukang Kayu L.02.a OH 2.4000 85,000 204,000
3 Kepala Tukang L.03 OH 0.2400 90,000 21,600
4 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 285,600
B Bahan
1 Papan (3x30) cm M.059.k m3 0.0250 11,332,797 283,320
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.3000 64,500 19,350
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 1.0000 131,900 131,900
Jumlah Harga Bahan 435,151
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Papan 2/20 M.068 m3 0.0250 24,391,500 609,788
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Plywood 4 mm, 120 x 240 M.130.b lbr 1.0000 229,353 229,353
4 Formika (90 x 120) cm M.326.a lbr 0.5000 262,600 131,300
Jumlah Harga Bahan 1,022,621
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Papan 2/20 M.068 m3 0.0250 24,391,500 609,788
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Plywood 4 mm, 120 x 240 M.130.b lbr 1.0000 229,353 229,353
5 Formika (90 x 120) cm M.326.a lbr 0.5000 262,600 131,300
Jumlah Harga Bahan 1,022,621
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Papan (3x30) cm M.059.W m3 0.0250 17,475,166 436,879
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Plywood 4 mm, 120 x 240 M.130.b lbr 1.0000 229,353 229,353
5 Formika (90 x 120) cm M.326.a lbr 0.5000 262,600 131,300
Jumlah Harga Bahan 849,713
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Papan (3x30) cm M.059.q m3 0.0250 10,259,418 256,485
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Plywood 4 mm, 120 x 240 M.130.b lbr 1.0000 229,353 229,353
5 Formika (90 x 120) cm M.326.a lbr 0.5000 262,600 131,300
Jumlah Harga Bahan 669,319
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Papan 2/20 M.068 m3 0.0250 24,391,500 609,788
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 1.0000 131,900 131,900
5 Formika (90 x 120) cm M.326.a lbr 0.5000 262,600 131,300
Jumlah Harga Bahan 925,168
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Papan (3x30) cm M.059.W m3 0.0250 17,475,166 436,879
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 1.0000 131,900 131,900
5 Vernis M.333 ltr 0.5000 93,100 46,550
6 Formika (90 x 120) cm M.326.a lbr 0.5000 262,600 131,300
Jumlah Harga Bahan 798,810
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.8500 70,000 59,500
2 Tukang Kayu L.02.a OH 2.5500 85,000 216,750
3 Kepala Tukang L.03 OH 0.2550 90,000 22,950
4 Mandor L.04 OH 0.0430 100,000 4,300
Jumlah Tenaga Kerja 303,500
B Bahan
1 Papan (3x30) cm M.059.q m3 0.0250 10,259,418 256,485
2 Paku M.109 kg 0.0300 19,354 581
3 Lem Kayu M.247 kg 0.8000 64,500 51,600
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 1.0000 131,900 131,900
5 Vernis M.333 ltr 0.5000 93,100 46,550
6 Formika (90 x 120) cm M.326.a lbr 0.5000 262,600 131,300
Jumlah Harga Bahan 618,416
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Papan (3x30) cm M.068.ha m3 0.0140 24,391,500 341,481
2 Paku M.109 kg 0.2500 19,354 4,839
3 Papan 3/20 cm M.068.d m3 0.0072 17,097,911 123,105
Jumlah Harga Bahan 469,424
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.s m3 0.0140 14,059,605 196,834
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.r m3 0.0072 13,680,132 98,497
Jumlah Harga Bahan 300,170
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.b m3 0.0140 13,087,631 183,227
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.b m3 0.0072 13,087,631 94,231
Jumlah Harga Bahan 282,296
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.m m3 0.0140 9,062,048 126,869
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.l m3 0.0072 9,062,048 65,247
Jumlah Harga Bahan 196,954
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.m m3 0.0140 9,062,048 126,869
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.l m3 0.0072 9,062,048 65,247
Jumlah Harga Bahan 196,954
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Papan (3x30) cm M.068.e m3 0.0140 17,475,166 244,652
2 Paku M.109 kg 0.2500 19,354 4,839
3 Papan 3/20 cm M.068.d m3 0.0072 17,097,911 123,105
Jumlah Harga Bahan 372,596
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.s m3 0.0140 14,059,605 196,834
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.r m3 0.0072 13,680,132 98,497
Jumlah Harga Bahan 300,170
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.b m3 0.0140 13,087,631 183,227
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.b m3 0.0072 13,087,631 94,231
Jumlah Harga Bahan 282,296
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.m m3 0.0140 9,062,048 126,869
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.l m3 0.0072 9,062,048 65,247
Jumlah Harga Bahan 196,954
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.m m3 0.0140 9,062,048 126,869
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.l m3 0.0072 9,062,048 65,247
Jumlah Harga Bahan 196,954
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Papan (3x30) cm M.068.e m3 0.0140 17,475,166 244,652
2 Paku M.109 kg 0.2500 19,354 4,839
3 Papan 3/20 cm M.068.d m3 0.0090 17,097,911 153,881
Jumlah Harga Bahan 403,372
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.s m3 0.0140 14,059,605 196,834
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.r m3 0.0090 13,680,132 123,121
Jumlah Harga Bahan 324,794
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.b m3 0.0140 13,087,631 183,227
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.b m3 0.0090 13,087,631 117,789
Jumlah Harga Bahan 305,854
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.m m3 0.0140 9,062,048 126,869
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.l m3 0.0090 9,062,048 81,558
Jumlah Harga Bahan 213,266
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 16,900
B Bahan
1 Usuk : 5/7 M.059.m m3 0.0140 9,062,048 126,869
2 Paku M.109 kg 0.2500 19,354 4,839
3 Reng : 2/3, 3/5 M.059.l m3 0.0090 9,062,048 81,558
Jumlah Harga Bahan 213,266
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1200 70,000 8,400
2 Tukang Kayu L.02.a OH 0.1200 85,000 10,200
3 Kepala Tukang L.03 OH 0.0120 90,000 1,080
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 20,280
B Bahan
1 Papan (3x30) cm M.068.e m3 0.0165 17,475,166 288,340
2 Paku M.109 kg 0.2000 19,354 3,871
Jumlah Harga Bahan 292,211
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1200 70,000 8,400
2 Tukang Kayu L.02.a OH 0.1200 85,000 10,200
3 Kepala Tukang L.03 OH 0.0120 90,000 1,080
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 20,280
B Bahan
1 Usuk : 5/7 M.059.s m3 0.0165 14,059,605 231,983
2 Paku M.109 kg 0.0570 19,354 1,103
Jumlah Harga Bahan 233,087
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1200 70,000 8,400
2 Tukang Kayu L.02.a OH 0.1200 85,000 10,200
3 Kepala Tukang L.03 OH 0.0120 90,000 1,080
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 20,280
B Bahan
1 Usuk : 5/7 M.059.b m3 0.0165 13,087,631 215,946
2 Paku M.109 kg 0.2000 19,354 3,871
Jumlah Harga Bahan 219,817
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1200 70,000 8,400
2 Tukang Kayu L.02.a OH 0.1200 85,000 10,200
3 Kepala Tukang L.03 OH 0.0120 90,000 1,080
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 20,280
B Bahan
1 Usuk : 5/7 M.059.m m3 0.0165 9,062,048 149,524
2 Paku M.109 kg 0.2000 19,354 3,871
Jumlah Harga Bahan 153,395
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1200 70,000 8,400
2 Tukang Kayu L.02.a OH 0.1200 85,000 10,200
3 Kepala Tukang L.03 OH 0.0120 90,000 1,080
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 20,280
B Bahan
1 Usuk : 5/7 M.059.m m3 0.0154 9,062,048 139,556
2 Paku M.109 kg 0.2000 19,354 3,871
Jumlah Harga Bahan 143,426
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.3000 85,000 25,500
3 Kepala Tukang L.03 OH 0.0300 90,000 2,700
4 Mandor L.04 OH 0.0750 100,000 7,500
Jumlah Tenaga Kerja 46,200
B Bahan
1 Papan (3x30) cm M.068.e m3 0.0154 17,475,166 269,118
2 Paku M.109 kg 0.2000 19,354 3,871
Jumlah Harga Bahan 272,988
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.4500 85,000 38,250
3 Kepala Tukang L.03 OH 0.0450 90,000 4,050
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 53,600
B Bahan
1 Papan 2/20 M.068.f m3 0.0280 10,030,739 280,861
2 Paku M.109 kg 0.1500 19,354 2,903
3 Lem Kayu M.247 kg 0.5600 64,500 36,120
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 0.8600 131,900 113,434
Jumlah Harga Bahan 433,318
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.4500 85,000 38,250
3 Kepala Tukang L.03 OH 0.0450 90,000 4,050
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 53,600
B Bahan
1 Balok M.059.t m3 0.0280 14,436,799 404,230
2 Paku M.109 kg 0.1500 19,354 2,903
3 Lem Kayu M.247 kg 0.5600 64,500 36,120
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 0.8600 131,900 113,434
Jumlah Harga Bahan 556,687
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.4500 85,000 38,250
3 Kepala Tukang L.03 OH 0.0450 90,000 4,050
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 53,600
B Bahan
1 Kayu Balok Borneo M.059 m3 0.0280 13,087,631 366,454
2 Paku M.109 kg 0.1500 19,354 2,903
3 Lem Kayu M.247 kg 0.5600 64,500 36,120
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 0.8600 131,900 113,434
Jumlah Harga Bahan 518,911
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1500 70,000 10,500
2 Tukang Kayu L.02.a OH 0.4500 85,000 38,250
3 Kepala Tukang L.03 OH 0.0450 90,000 4,050
4 Mandor L.04 OH 0.0080 100,000 800
Jumlah Tenaga Kerja 53,600
B Bahan
1 Balok M.059.h m3 0.0280 8,436,914 236,234
2 Paku M.109 kg 0.1500 19,354 2,903
3 Lem Kayu M.247 kg 0.5600 64,500 36,120
4 Teakwood (120 x 240) cm x 4 mm M.132.c lbr 0.8600 131,900 113,434
Jumlah Harga Bahan 388,691
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x30) cm M.068.ha m3 0.0108 24,391,500 263,428
2 Paku Kayu Segala Ukuran M.109.o kg 0.1000 16,000 1,600
Jumlah Harga Bahan 265,028
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x20) cm M.059.w m3 0.0108 17,475,166 188,732
2 Paku Kayu Segala Ukuran M.109.o kg 0.1000 16,000 1,600
Jumlah Harga Bahan 190,332
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x20) cm M.059.W m3 0.0108 17,475,166 188,732
2 Paku Kayu Segala Ukuran M.109.o kg 0.1000 16,000 1,600
Jumlah Harga Bahan 190,332
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x20) cm M.059.p m3 0.0108 10,259,418 110,802
2 Paku Kayu Segala Ukuran M.109.o kg 0.1000 16,000 1,600
Jumlah Harga Bahan 112,402
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x20) cm M.059.p m3 0.0108 10,259,418 110,802
2 Paku Kayu Segala Ukuran M.109.o kg 0.1000 16,000 1,600
Jumlah Harga Bahan 112,402
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x30) cm M.068.N m3 0.0110 25,654,800 282,203
2 Paku Kayu Segala Ukuran M.109.o kg 0.0500 16,000 800
Jumlah Harga Bahan 283,003
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x30) cm M.059.w m3 0.0110 17,475,166 192,227
2 Paku Kayu Segala Ukuran M.109.o kg 0.0500 16,000 800
Jumlah Harga Bahan 193,027
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x30) cm M.059.w m3 0.0110 17,475,166 192,227
2 Paku Kayu Segala Ukuran M.109.o kg 0.0500 16,000 800
Jumlah Harga Bahan 193,027
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x30) cm M.059.q m3 0.0110 10,259,418 112,854
2 Paku Kayu Segala Ukuran M.109.o kg 0.0500 16,000 800
Jumlah Harga Bahan 113,654
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang Kayu L.03.a OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 26,300
B Bahan
1 Papan (3x30) cm M.059.s m3 0.0110 14,059,605 154,656
2 Paku Kayu Segala Ukuran M.109.o kg 0.0500 16,000 800
Jumlah Harga Bahan 155,456
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0100 70,000 700
2 Tukang Kayu L.02.a OH 0.1000 85,000 8,500
3 Kepala Tukang L.03 OH 0.0100 90,000 900
4 Mandor L.04 OH 0.0005 100,000 50
Jumlah Tenaga Kerja 10,150
B Bahan
1 Grendel Jendela M.158.b bh 1.0000 20,100 20,100
Jumlah Harga Bahan 20,100
C Peralatan
KODE ANALISA
JENIS PEKERJAAN : Memasangan hak angin jendela
SATUAN PEMBAYARAN : buah
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0200 70,000 1,400
2 Tukang Kayu L.02.a OH 0.2000 85,000 17,000
3 Kepala Tukang L.03 OH 0.0200 90,000 1,800
4 Mandor L.04 OH 0.0100 100,000 1,000
Jumlah Tenaga Kerja 21,200
B Bahan
1 Hak Angin M.158.c bh 1.0000 44,300 44,300
Jumlah Harga Bahan 44,300
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0150 70,000 1,050
2 Tukang L.02 OH 0.1500 85,000 12,750
3 Kepala Tukang L.03 OH 0.0150 90,000 1,350
4 Mandor L.04 OH 0.0008 100,000 80
Jumlah Tenaga Kerja 15,230
B Bahan
1 Glass Block M.096.a m2 1.1000 153,500 168,850
Jumlah Harga Bahan 168,850
C Peralatan
A. TENAGA
1 Pekerja Biasa L.01 Org / Hr 0.0850 Rp 70,000 Rp 5,950.00
2 Tukang Besi L.02.e Org / Hr 0.0850 Rp 85,000 Rp 7,225.00
3 Kepala Tukang Besi L.03.c Org / Hr 0.0085 Rp 90,000 Rp 765.00
4 Mandor L.04 Org / Hr 0.0042 Rp 100,000 Rp 420.00
JUMLAH HARGA TENAGA Rp 14,360.00
B BAHAN
1 Profil daun pintu PVC m1 4.4000 Rp 500,000 Rp 2,200,000.00
2 Sekrup M.372 bh 8.0000 Rp 125 Rp 1,000.00
A. TENAGA
1 Pekerja l.01 Org / Hr 0.0430 Rp 70,000 Rp 3,010.00
2 Tukang L.02 Org / Hr 0.0430 Rp 85,000 Rp 3,655.00
3 Kepala Tukang L.03 Org / Hr 0.0043 Rp 90,000 Rp 387.00
4 Mandor L.04 Org / Hr 0.0021 Rp 100,000 Rp 210.00
JUMLAH HARGA TENAGA Rp 7,262.00
B BAHAN
1 Kusen Alluminium M.708 m1 1.1000 Rp 151,500 Rp 166,650.00
2 Sekrup M.372 Bh 2.0000 Rp 125 Rp 250.00
3 Sealent M.244 Tube 0.0600 Rp 16,500 Rp 990.00
JUMLAH HARGA BAHAN Rp 167,890.00
C PERALATAN
A. TENAGA
1 Pekerja l.01 Org / Hr 0.0850 Rp 70,000 Rp 5,950.00
2 Tukang L.02 Org / Hr 0.0850 Rp 85,000 Rp 7,225.00
3 Kepala Tukang L.03 Org / Hr 0.0090 Rp 90,000 Rp 810.00
4 Mandor L.04 Org / Hr 0.0050 Rp 100,000 Rp 500.00
JUMLAH HARGA TENAGA Rp 14,485.00
B BAHAN
1 Kusen Alluminium Putih M.708 m1 4.4000 Rp 151,500 Rp 666,600.00
2 Kaca 5mm m.091 m1 4.5000 Rp 22,500 Rp 101,250.00
3 Sealent M.244 tube 0.2700 Rp 16,500 Rp 4,455.00
JUMLAH HARGA BAHAN Rp 772,305.00
C PERALATAN
A. TENAGA
1 Pekerja l.01 Org / Hr 0.0850 Rp 70,000 Rp 5,950.00
2 Tukang L.02 Org / Hr 0.0850 Rp 85,000 Rp 7,225.00
3 Kepala Tukang L.03 Org / Hr 0.0090 Rp 90,000 Rp 810.00
4 Mandor L.04 Org / Hr 0.0050 Rp 100,000 Rp 500.00
JUMLAH HARGA TENAGA Rp 14,485.00
B BAHAN
1 Kusen Alluminium Putih M.708 m1 1.1000 Rp 151,500 Rp 166,650.00
2 Profil Kaca m.091 m1 1.1000 Rp 22,500 Rp 24,750.00
3 Sealent M.244 tube 0.1200 Rp 16,500 Rp 1,980.00
JUMLAH HARGA BAHAN Rp 193,380.00
C PERALATAN
A. TENAGA
1 Pekerja l.01 Org / Hr 0.0500 Rp 70,000 Rp 3,500.00
2 Tukang L.02 Org / Hr 0.5000 Rp 85,000 Rp 42,500.00
3 Kepala Tukang L.03 Org / Hr 0.0500 Rp 90,000 Rp 4,500.00
4 Mandor L.04 Org / Hr 0.0025 Rp 100,000 Rp 250.00
JUMLAH HARGA TENAGA Rp 50,750.00
B BAHAN
1 Handle pintu + jendela bh 1.0000 Rp 15,000.00 Rp 15,000.00
JUMLAH HARGA BAHAN Rp 15,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0150 70,000 1,050
2 Tukang L.02 OH 0.1500 85,000 12,750
3 Kepala Tukang L.03 OH 0.0150 90,000 1,350
4 Mandor L.04 OH 0.0008 100,000 80
Jumlah Tenaga Kerja 15,230
B Bahan
1 roster semen krepyak uk. 20 x 40 cm m2 1.1000 125,000 137,500
Jumlah Harga Bahan 137,500
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.02 70,000 1,400
2 Tukang Cat L.02.h OH 0.063 85,000 5,355
3 Kepala Tukang L.03 OH 0.0063 90,000 567
4 Mandor L.04 OH 0.0025 100,000 250
Jumlah Tenaga Kerja 7,572
B Bahan
1 Plamuur M.249 kg 0.1 26,000 2,600
2 Cat Dasar M.253.a kg 0.1 32,500 3,250
3 Cat Tembok Interior M.253.j kg 0.26 5,500 1,430
Jumlah Harga Bahan 7,280
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.02 70,000 1,400
2 Tukang Cat L.02.h OH 0.063 85,000 5,355
3 Kepala Tukang L.03 OH 0.0063 90,000 567
4 Mandor L.04 OH 0.0025 100,000 250
Jumlah Tenaga Kerja 7,572
B Bahan
1 Plamir M.249 kg 0.1 26,000 2,600
2 Cat Dasar M.253.a kg 0.1 32,500 3,250
3 Cat Tembok Eksterior M.253.k kg 0.26 59,000 15,340
Jumlah Harga Bahan 21,190
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.02 70,000 1,400
2 Tukang Cat L.02.h OH 0.063 85,000 5,355
3 Kepala Tukang L.03 OH 0.0063 90,000 567
4 Mandor L.04 OH 0.0025 100,000 250
Jumlah Tenaga Kerja 7,572
B Bahan
1 Plamuur M.249 kg 0.1 26,000 2,600
2 Cat Dasar M.253.a kg 0.1 32,500 3,250
3 Cat dinding M.253.h kg 0.26 42,500 11,050
Jumlah Harga Bahan 16,900
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.02 70,000 1,400
2 Tukang Cat L.02.h OH 0.063 85,000 5,355
3 Kepala Tukang L.03 OH 0.0063 90,000 567
4 Mandor L.04 OH 0.0025 100,000 250
Jumlah Tenaga Kerja 7,572
B Bahan
1 Cat Dasar M.253.a kg 0.1 32,500 3,250
2 Cat Tembok Interior M.253.j kg 0.26 5,500 1,430
Jumlah Harga Bahan 4,680
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.02 70,000 1,400
2 Tukang Cat L.02.h OH 0.063 85,000 5,355
3 Kepala Tukang L.03 OH 0.0063 90,000 567
4 Mandor L.04 OH 0.0025 100,000 250
Jumlah Tenaga Kerja 7,572
B Bahan
1 Cat Dasar M.253.a kg 0.1 32,500 3,250
2 Cat Tembok Eksterior M.253.k kg 0.26 59,000 15,340
Jumlah Harga Bahan 18,590
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien (RP) Jumlah (Rp)
A TENAGA
Pekerja L.01 OH 0.1050 70,000 7,350
Tukang pipa L.02.i OH 0.0530 85,000 4,505
Mandor L.04 OH 0.0110 100,000 1,100
Harga Satuan
No Uraian Kode Satuan Koefisien (RP) Jumlah (Rp)
A TENAGA
Pekerja L.01 OH 0.1890 70,000 13,230
Tukang pipa L.02.i OH 0.0950 85,000 8,075
Mandor L.04 OH 0.0190 100,000 1,900
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
JUMLAH TENAGA KERJA 640
B BAHAN
Air test (air bersih) M.230.b m3 0.0080 53,025 424
Bahan bakar M.232.a ltr 0.0600 8,000 480
Oli M.234 ltr 0.0020 42,208 84
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
JUMLAH TENAGA KERJA 640
B BAHAN
Air test (air bersih) M.230.b m3 0.0180 53,025 954
Bahan bakar M.232.a ltr 0.0600 8,000 480
Oli M.234 ltr 0.0020 42,208 84
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
JUMLAH TENAGA KERJA 640
B BAHAN
Air test (air bersih) M.230.b m3 0.0310 53,025 1,644
Bahan bakar M.232.a ltr 0.0600 8,000 480
Oli M.234 ltr 0.0020 42,208 84
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
JUMLAH TENAGA KERJA 640
B BAHAN
Air test (air bersih) M.230.b m3 0.0490 53,025 2,598
Bahan bakar M.232.a ltr 0.0600 8,000 480
Oli M.234 ltr 0.0020 42,208 84
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
JUMLAH TENAGA KERJA 640
B BAHAN
Air test (air bersih) M.230.b m3 0.0710 53,025 3,765
Bahan bakar M.232.a ltr 0.0600 8,000 480
Oli M.234 ltr 0.0020 42,208 84
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
JUMLAH TENAGA KERJA 640
B BAHAN
Air test (air bersih) M.230.b m3 0.1260 53,025 6,681
Bahan bakar M.232.a ltr 0.0600 8,000 480
Oli M.234 ltr 0.0020 42,208 84
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
JUMLAH TENAGA KERJA 640
B BAHAN
Air test (air bersih) M.230.b m3 0.1580 53,025 8,378
Bahan bakar M.232.a ltr 0.0600 8,000 480
Oli M.234 ltr 0.0020 42,208 84
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah (Rp)
(RP)
A TENAGA
Pekerja L.01 OH 0.0080 70,000 560
Mandor L.04 OH 0.0008 100,000 80
JUMLAH TENAGA KERJA 640
B BAHAN
Air test (air bersih) M.230.b m3 0.2830 53,025 15,006
Bahan bakar M.232.a ltr 0.0600 8,000 480
Oli M.234 ltr 0.0020 42,208 84
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5000 70,000 35,000
2 Tukang Listrik L.02.aa OH 0.5000 85,000 42,500
3 Kepala Tukang L.03 OH 0.0500 90,000 4,500
4 Mandor L.04 OH 0.0200 100,000 2,000
Jumlah Tenaga Kerja 84,000
B Bahan
1 Kabel NYA 2.5 mm M.308.e m1 10.0000 7,750 77,500
2 Stop Kontak M.310.a bh 1.0000 12,000 12,000
3 T DUS M.311 bh 1.0000 2,500 2,500
4 Pipa PVC 5/8" M.218.aj ljr 0.6500 7,500 4,875
5 Las Dop M.289 Bh 3.0000 8,000 24,000
Jumlah Harga Bahan 120,875
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5000 70,000 35,000
2 Tukang Listrik L.02.aa OH 0.5000 85,000 42,500
3 Kepala Tukang L.03 OH 0.0500 90,000 4,500
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 87,000
B Bahan
1 Kabel NYA 2,5 mm M.308.e m1 6.0000 7,750 46,500
2 Saklar Broco Tunggal M.310.b bh 1.0000 12,000 12,000
3 T Dus M.311 bh 1.0000 2,500 2,500
4 Pipa PVC 5/8" M.218.aj Ljr 0.6500 7,500 4,875
5 Las Dop M.289 bh 2.0000 8,000 16,000
Jumlah Harga Bahan 81,875
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5000 70,000 35,000
2 Tukang Listrik L.02.aa OH 0.5000 85,000 42,500
3 Kepala Tukang L.03 OH 0.0500 90,000 4,500
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 87,000
B Bahan
1 Kabel NYA 2.5 mm M.308.e m1 10.0000 7,750 77,500
2 Saklar Broco Ganda M.310.c bh 1.0000 18,000 18,000
3 T Dus M.311 bh 1.0000 2,500 2,500
4 Pipa PVC 5/8" M.218.aj Ljr 0.6500 7,500 4,875
5 Las Dop M.289 bh 3.0000 8,000 24,000
Jumlah Harga Bahan 126,875
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5800 70,000 40,600
2 Tukang Listrik L.02.aa OH 0.1200 85,000 10,200
3 Mandor L.04 OH 0.0400 100,000 4,000
Jumlah Tenaga Kerja 54,800
B Bahan
1 Kabel NYM 3 x 2,5 mm m' 2.0000 6,500 13,000
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Tukang Listrik L.02.aa OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0250 100,000 2,500
Jumlah Tenaga Kerja 43,500
B Bahan
1 Lampu LED 40 Watt Komplit M.310.g bh 1.0000 125,000 125,000
2 Kabel NYA 2.5 mm M.308.e m1 10.0000 7,750 77,500
3 Isolator M.374 m1 4.0000 1,050 4,200
4 Fiting Flafond M.122.a bh 1.0000 12,000 12,000
5 Las Dop M.289 bh 2.0000 8,000 16,000
Jumlah Harga Bahan 234,700
C Peralatan
JENIS PEKERJAAN : Pasang Main Panel Distribusi ( MDP ) Type Wall Mounting (40x30x20)
SATUAN PEMBAYARAN : titik
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.3000 70,000 161,000
2 Tukang Listrik L.02.aa OH 2.3300 85,000 198,050
3 Perakitan Panel Lot 4.6700 225,000 1,050,750
4 Mandor L.04 OH 2.3300 100,000 233,000
Jumlah Tenaga Kerja 1,642,800
B Bahan
Panel Indoor Type Wall Mounting 1.0000 250,000 250,000
1 Tinggi x Lebar x Tebal (40x30x20) Bh
TERMINLA BLOCK 4 PIN - 25 mm - 1.0000 100,000 100,000
2 100A ( INCOMING - LOAD ) Bh
TERMINLA BLOCK 4 PIN - 25 mm - 1.0000 100,000 100,000
3 100A ( OUTGOING - LOAD ) Bh
1.0000 125,000 125,000
4 SELECTOR SWITCH ( LOCAL - REMOTE ) Bh
AMPERE METER ( 0-600 A, 96x96, class 3.0000 150,000 450,000
5 1.5/5 A ) Bh
VOLTMETER ( 0-500 V, 96x96, class 1.0000 150,000 150,000
6 1.5/5 A ) Bh
FREQUENSI METER (Hz), VIA CT ( 600/5 1.0000 150,000 150,000
7 A, 96x96, class 1.5/5 A ) Bh
8 CT RING ( FOR AMPERE METERING ) Bh 1.0000 70,000 70,000
NYAF 1 x 1,5 mm ( For Wiring Cable - 20.0000 6,500 130,000
9 Black ) Mtr
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Tukang Listrik L.02.aa OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0250 100,000 2,500
Jumlah Tenaga Kerja 43,500
B Bahan
1 Lampu LED 8 Watt M.310.i bh 1.0000 35,000 35,000
2 Kabel NYA 2.5 mm M.308.e m1 10.0000 7,750 77,500
3 Isolator M.374 m1 4.0000 1,050 4,200
4 Fiting Flafond M.122.a bh 1.0000 12,000 12,000
5 Las Dop M.289 bh 2.0000 8,000 16,000
Jumlah Harga Bahan 144,700
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Tukang Listrik L.02.aa OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0250 100,000 2,500
Jumlah Tenaga Kerja 43,500
B Bahan
1 Lampu LED 14 Watt M.310.j bh 1.0000 38,000 38,000
2 Kabel NYA 2.5 mm M.308.e m1 10.0000 7,750 77,500
3 Isolator M.374 m1 4.0000 1,050 4,200
4 Fiting Flafond M.122.a bh 1.0000 12,000 12,000
5 Las Dop M.289 bh 2.0000 8,000 16,000
Jumlah Harga Bahan 147,700
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.3300 70,000 163,100
2 Tukang Listrik L.02.aa OH 2.3300 85,000 198,050
3 Perakitan Panel Lot 4.6700 225,000 1,050,750
4 Mandor L.04 OH 2.3300 100,000 233,000
Jumlah Tenaga Kerja 1,644,900
B Bahan
Panel Indoor Type Wall Mounting 1.0000 250,000 250,000
1 Tinggi x Lebar x Tebal (40x30x20) Bh
TERMINLA BLOCK 4 PIN - 25 mm - 1.0000 100,000 100,000
2 100A ( INCOMING - LOAD ) Bh
NYAF 1 x 1,5 mm ( For Wiring Cable - 65,000
6,500
3 Black ) Mtr 10.0000
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 70,000 17,500
2 Tukang Listrik L.02.aa OH 0.2500 85,000 21,250
3 Kepala Tukang L.03 OH 0.0250 90,000 2,250
4 Mandor L.04 OH 0.0250 100,000 2,500
Jumlah Tenaga Kerja 43,500
B Bahan
1 Lampu LED 23 Watt M.310.l bh 1.0000 42,500 42,500
2 Kabel NYA 2.5 mm M.308.e m1 10.0000 7,750 77,500
3 Isolator M.374 m1 4.0000 1,050 4,200
4 Fiting Flafond M.122.a bh 1.0000 12,000 12,000
5 Las Dop M.289 bh 2.0000 8,000 16,000
Jumlah Harga Bahan 152,200
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6200 70,000 43,400
2 Tukang Listrik L.02.aa OH 0.0620 85,000 5,270
3 Kepala Tukang L.03 OH 0.0060 90,000 540
4 Mandor L.04 OH 0.0060 100,000 600
Jumlah Tenaga Kerja 49,810
B Bahan
1 Zekering Kast Lokal 1 Group M.310.m Unit 1.0000 104,700 104,700
2 Kabel NYA 4.0 mm M.308.f m1 4.0000 13,100 52,400
3 Pipa PVC 5/8" M.218.ac Ljr 1.0000 7,400 7,400
Jumlah Harga Bahan 164,500
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.0000 70,000 140,000
2 Tukang Listrik L.02.aa OH 0.5000 85,000 42,500
3 Kepala Tukang L.03 OH 0.0500 90,000 4,500
4 Mandor L.04 OH 0.0500 100,000 5,000
Jumlah Tenaga Kerja 192,000
B Bahan
1 Pipa Arde M.219.f m1 6.0000 445,000 2,670,000
2 Pipa PVC tipe AW Ø 1/2 " M.218.a m 40.0000 11,250 450,000
3 Pipa Galvanis Ø 1/2 " M.214.a m 1.0000 55,000 55,000
4 Pipa Galvanis Ø 1" M.214.e m 1.0000 85,000 85,000
5 Splits Dia 1 " M.219.g bh 1.0000 325,000 325,000
6 Timah M.261.d kg 0.5000 450,000 225,000
7 Kawat BC M.101.c m1 40.0000 22,500 900,000
Jumlah Harga Bahan 4,710,000
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja Biasa L.01 OH 5.3000 70,000 371,000
2 Tukang Batu L.02.b OH 0.2750 85,000 23,375
3 Tukang Kayu L.02.a OH 1.3000 85,000 110,500
4 Tukang Besi/Baja L.02.e OH 1.0500 85,000 89,250
5 Kepala Tukang Batu L.03.b OH 0.2650 90,000 23,850
6 Mandor L.04 OH 0.2650 100,000 26,500
Jumlah Tenaga Kerja 644,475
B Bahan
a Beton
1 Portland Cemen (PC) M.030 Kg 413.0000 1,000 413,000
2 Pasir Cor M.003.b M3 0.5429 140,000 76,006
3 Besi Polos 10 M.037 Kg 115.5556 6,500 751,111
4 Besi Polos 8 M.037 Kg 46.5778 6,500 302,756
5 Batu Pecah mesin 2/3 M.016.b M3 0.7622 165,000 125,763
6 Paku Kayu Segala Ukuran M.109.o Kg 1.0667 16,000 17,067
7 Minyak Bekisting M.237.b ltr 1.6000 4,500 7,200
8 Kawat Beton/Bendrat RRT M.100.a Kg 0.7500 16,000 12,000
b Bekisting
1 Papan Kayu Kelas III M.067 m3 0.3200 1,500,000 480,000
2 Balok Kayu Kelas III M.058.a m3 0.1200 1,500,000 180,000
3 Multiplek 9 mm M.129.a lbr 2.8000 100,000 280,000
4 Dolken Kayu Dia 8 cm M.075.a btg 32.0000 4,500 144,000
Jumlah Harga Bahan 2,788,903
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 3,433,378
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 3,433,378
KODE ANALISA : G.040.ag
JENIS PEKERJAAN : 1 m3 Balok Beton Bertulang B16 15/30 + Bekisting
SATUAN PEMBAYARAN : m3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja Biasa L.01 OH 6.3500 70,000 444,500
2 Tukang Batu L.02.b OH 0.2750 85,000 23,375
3 Tukang Kayu L.02.a OH 1.6500 85,000 140,250
4 Tukang Besi/Baja L.02.e OH 1.4000 85,000 119,000
5 Kepala Tukang Batu L.03.b OH 0.3330 90,000 29,970
6 Mandor L.04 OH 0.3180 100,000 31,800
Jumlah Tenaga Kerja 788,895
B Bahan
a Beton
1 Portland Cement (PC) M.030 Kg 413.0000 1,000 413,000
2 Pasir Cor M.003.b M3 0.4860 140,000 68,040
3 Besi Polos 12 M.037 Kg 98.5560 6,500 640,614
4 Besi Ulir 10 M.037.c Kg 27.4220 6,750 185,099
5 Besi Ulir 10 M.037.c Kg 45.9040 6,750 309,852
6 Batu Pecah mesin 2/3 M.016.b M3 0.7560 165,000 124,740
7 Paku Kayu Segala Ukuran M.109.o Kg 3.2000 16,000 51,200
8 Minyak Bekisting M.237.b ltr 1.6000 4,500 7,200
9 Kawat Beton/Bendrat RRT M.100.a Kg 3.0000 16,000 48,000
b Bekisting
1 Papan Kayu Kelas III M.067 m3 0.3200 1,500,000 480,000
2 Balok Kayu Kelas III M.058.a m3 0.1400 1,500,000 210,000
3 Multiplek 9 mm M.129.a lbr 2.8000 100,000 280,000
4 Dolken Kayu Dia 8 cm M.075.a btg 16.0000 4,500 72,000
Jumlah Harga Bahan 2,889,745
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 3,678,640
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 3,678,640
JENIS PEKERJAAN : Pasang plafond calsiboard
SATUAN PEMBAYARAN : m2
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja Biasa L.01 OH 0.1000 70,000 7,000
2 Tukang Kayu L.02.a OH 0.0500 85,000 4,250
3 Kepala Tukang Kayu L.03.a OH 0.0050 90,000 450
4 Mandor L.04 OH 0.0005 100,000 50
Jumlah Tenaga Kerja 11,750
B Bahan
1 Kalsi Board t=0,45mm M.142.a Lbr 0.3640 55,000 20,020
2 Sekrup Segala Ukuran M.372 Bh 9.0000 125 1,125
Jumlah Harga Bahan 21,145
C Peralatan
Alat Bantu Ls 1.0000
-
D Jumlah (A+B+C) 32,895
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 32,895
JENIS PEKERJAAN : Besi siku L 80.80.6
SATUAN PEMBAYARAN : kg
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga ###
1 Pekerja Biasa L.01 OH 0.0610 70,000 4,270
2 Tukang Besi/Baja L.02.e OH 0.0061 85,000 519
3 Kepala Tukang Besi L.03.c OH 0.0061 90,000 549
4 Mandor L.04 OH 0.0003 100,000 30
Jumlah Tenaga Kerja 5,368
B Bahan ###
1 Baja L 80.80.6 M.667 Kg 1.1500 7,800 8,970
2 Solar M.232.c Ltr 0.0100 9,700 97
3 Minyak Pelumas M.233 Ltr 0.0010 20,550 21
4 Elektroda M.366 Kg 0.0200 40,500 810
Jumlah Bahan 9,898
C Peralatan ###
###
Jumlah Peralatan -
D Jumlah (A+B+C) 15,265
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 15,265
JENIS PEKERJAAN : Pasang plafond gypsum
SATUAN PEMBAYARAN : m2
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga ###
1 Pekerja Biasa L.01 OH 0.1000 70,000 7,000
2 Tukang kayu L.02.a OH 0.0500 85,000 4,250
3 Kepala Tukang kayu L.03.a OH 0.0050 90,000 450
4 Mandor L.04 OH 0.0050 100,000 500
Jumlah Tenaga Kerja 12,200
B Bahan ###
Gypsum Board sekualitas
1 M.127 lbr 0.3640 95,000 34,580
jayaboard t = 9 mm
2 Sekrup segala ukuran M.372 bh 9.0000 125 1,125
Jumlah Bahan 35,705
C Peralatan ###
###
Jumlah Peralatan ###
D Jumlah (A+B+C) 47,905
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 47,905
###
JENIS PEKERJAAN : Pilcecap
SATUAN PEMBAYARAN : m3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga ###
1 Pekerja Biasa L.01 OH 5.3000 70,000 371,000
2 Tukang Kayu L.02.a OH 1.3000 85,000 110,500
3 Tukang Batu L.02.b OH 0.2750 85,000 23,375
4 Tukang Besi/Baja L.02.e OH 1.0500 85,000 89,250
5 Kepala Tukang Batu L.03.b OH 0.2620 90,000 23,580
6 Mandor L.04 OH 0.2650 100,000 26,500
Jumlah Tenaga Kerja 594,125
B Bahan ###
a Beton ###
1 Besi Ulir M.037.c Kg 123.8160 6,750 835,758
2 Kawat Beton/ Bendrat RRT M.100.a Kg 2.2500 16,000 36,000
3 Portland Cement (PC) M.030 Kg 413.0000 1,000 413,000
4 Pasir Cor M.003.b m3 0.4860 140,000 68,040
5 Minyak Bekisting M.237.b Ltr 0.4000 4,500 1,800
6 Batu Pecah Mesin 2/3 M.016.b m3 0.7560 165,000 124,740
b Bekisting ###
1 Balok Kayu Kelas III M.058.a m3 0.2000 1,500,000 300,000
2 Multiplek 9 mm M.129.a Lbr 2.5000 100,000 250,000
Bekisting 2 Kali Pakai ###
Jumlah Bahan 2,029,338
C Peralatan ###
###
Jumlah Peralatan -
D Jumlah (A+B+C) 2,623,463
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 2,623,463
JENIS PEKERJAAN : Pilecap tangga
SATUAN PEMBAYARAN : m3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga ###
1 Pekerja Biasa L.01 OH 5.3000 70,000 371,000
2 Tukang Kayu L.02.a OH 1.3000 85,000 110,500
3 Tukang Batu L.02.b OH 0.2750 85,000 23,375
4 Tukang Besi/Baja L.02.e OH 1.0500 85,000 89,250
5 Kepala Tukang Batu L.03.b OH 0.2620 90,000 23,580
6 Mandor L.04 OH 0.2650 100,000 26,500
Jumlah Tenaga Kerja 594,125
B Bahan ###
a Beton ###
1 Besi Ulir M.037.c Kg 100.8550 6,750 680,771
2 Kawat Beton/ Bendrat RRT M.100.a Kg 2.2500 16,000 36,000
3 Portland Cement (PC) M.030 Kg 413.0000 1,000 413,000
4 Pasir Cor M.003.b m3 0.4860 140,000 68,040
5 Minyak Bekisting M.237.b Ltr 0.4000 4,500 1,800
6 Batu Pecah Mesin 2/3 M.016.b m3 0.7560 165,000 124,740
b Bekisting ###
1 Balok Kayu Kelas II M.058.a m3 0.0340 1,500,000 51,000
2 Multiplek 9 mm M.129.a Lbr 2.5000 100,000 250,000
Bekisting 2 Kali Pakai ###
Jumlah Bahan 1,375,351
C Peralatan ###
###
Jumlah Peralatan -
D Jumlah (A+B+C) 1,969,476
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 1,969,476
JENIS PEKERJAAN : Kolom
SATUAN PEMBAYARAN : m3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga 7
1 Pekerja Biasa L.01 OH 5.3000 70,000 371,000
2 Tukang Batu L.02.b OH 0.2750 85,000 23,375
3 Tukang Kayu L.02.a OH 1.3000 85,000 110,500
4 Tukang Besi/ Baja L.02.e OH 1.0500 85,000 89,250
5 Kepala Tukang batu L.03.b OH 0.2650 90,000 23,850
6 Mandor L.04 OH 0.2650 100,000 26,500
Jumlah Tenaga Kerja 644,475
B Bahan
a Beton
1 Portland Cemen (PC) M.030 Kg 326.0000 1,000 326,000
2 Pasir Cor M.003.b m3 0.5429 140,000 76,006
3 Besi Polos M.037 Kg 104.0000 6,500 676,000
5 Batu Pecah Mesin 2/3 M.016.b m3 0.7622 165,000 125,763
6 Paku Kayu Segala Ukuran M.109.o Kg 1.0667 16,000 17,067
7 Minyak Bekisting M.237.b Ltr 1.6000 4,500 7,200
8 Kawat Beton/ Bendrat RRT M.100.a Kg 0.7500 16,000 12,000
b Bekisting -
1 Papan Kayu Kelas III M.067 m3 0.3200 1,500,000 480,000
2 Balok Kayu Kelas III M.058.a m3 0.1200 1,500,000 180,000
3 Multiplek 9 mm M.129.a Lbr 2.8000 100,000 280,000
4 Dolken Kayu Dia 8 cm M.075.a Btg 32.0000 4,500 144,000
Bekisting 2 Kali Pakai
Jumlah Bahan 2,324,036
C Peralatan
Jumlah Peralatan -
D Jumlah (A+B+C) 2,968,511
E Overhead + Profit (Contoh 15%) 0% x D (maksimum) -
F Harga Satuan Pekerjaan (D+E) 2,968,511