Terbilang : Tujuh Ratus Enam Puluh Tujuh Juta Delapan Ratus Ribu Rupiah
Dibuat Oleh :
Pemilik Perencana
Mengetahui :
KEPALA BIDANG CIPTA KARYA PEMUKUMAN
DAN TATA RUANG KABUPATEN
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT. VOLUME SATUAN HARGA
RP.
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pengukuran / pasang bouwplank Ls 1.000 2,500,000.00 2,500,000.00
Jumlah 2,500,000.00
II. PEKERJAAN TANAH
1 Galian tanah pondasi M3 47.784 76,500.00 3,655,476.00
2 Urugan tanah kembali M3 15.928 25,500.00 406,164.00
3 Urugan Pasir dibawah pondasi, lantai dan rabat tebal = 5 cm M3 16.903 681,250.00 11,514,828.13
4 Urugan Tanah Peninggian Lantai M3 71.250 430,872.80 30,699,687.00
Jumlah 46,276,155.13
III. PEKERJAAN PASANGAN DAN BETON
1 Pondasi Batu Bata campuran 1:4 M3 36.452 1,784,570.00 65,051,591.78
2 Cor Sloof uk. 15/20, 1 Pc : 3 Ps M3 4.245 9,191,121.00 39,016,308.63
3 Cor Balok Teras 15/35, 1 Pc : 2 Ps : 3 Kr M3 0.945 9,440,833.99 8,921,588.12
4 Cor Balok Anak Teras uk. 15/20, 1 Pc : 2 Ps : 3 Kr M3 0.285 9,227,478.62 2,629,831.41
5 Cor Ringbalk 15/20, 1 Pc : 3 Ps M3 5.189 9,191,121.00 47,688,131.29
6 Cor Kolom Teras 30/30, 1 Pc : 2 Ps : 3 Kr M3 1.283 7,601,544.15 9,748,980.37
7 Cor Kolom Diagonal Teras 20/50 , 1 Pc : 2 Ps : 3 kr M3 0.425 9,683,202.85 4,115,361.21
8 Cor Kolom Praktis 15/15 beton bertulang M3 3.465 9,312,449.93 32,267,639.02
9 Cor Plat Dak Teras dan Kanopi Beton Bertulang 1 Pc : 2 Ps : 3 Kr M3 3.511 8,279,410.32 29,072,652.57
10 Cor lantai dan teras 1:3 tebal 7 cm M3 16.625 2,265,300.00 37,660,612.50
11 Pas. keramik uk. 30 x 30 cm ( Polos ) M2 230.750 220,943.11 50,982,622.63
12 Pas. keramik uk. 30 x 30 cm ( Berglasir ) M2 6.000 224,504.11 1,347,024.66
13 Pas. keramik uk. 30 x 30 (Mozaik ) M2 9.000 236,872.65 2,131,853.85
14 Pas. Keramik Anti Slip uk. 20 x 20 cm M2 20.250 223,274.70 4,521,312.68
15 Pasangan Batu Bata 1/2 batu campuran 1:4 M2 536.234 199,028.40 106,725,785.09
16 Plesteran Dinding campuran 1:3 M2 753.705 73,621.16 55,488,658.48
Jumlah 497,369,954.30
IV. PEKERJAAN KAYU DAN PASANG MEMASANG
1 Kuda- kuda Kayu klas II, 5/10 cm M3 3.120 5,363,407.20 16,732,489.61
2 Gording kayu kelas II 5/10 M3 2.121 4,587,136.00 9,728,856.74
3 Plafon tripleks 3 mm M2 257.750 47,090.88 12,137,673.03
4 Rangka plafon kayu klas II M2 257.750 81,284.44 20,951,064.41
5 List Plafon kayu klas II uk. 2/4 M1 251.000 10,476.62 2,629,631.62
6 Listplank Kayu Kls II M1 14.646 38,425.32 562,792.62
7 Pas Pintu Dobel 70 x 210 cm Bh 1.000 2,740,406.77 2,740,406.77
8 Pas Pintu Dobel 90 x 210 cm Bh 1.000 2,851,134.52 2,851,134.52
9 Pas Pintu 90 x 210 cm Bh 5.000 1,487,081.26 7,435,406.31
10 Pas. Pintu Fiber KM/Wc Bh 2.000 704,500.00 1,409,000.00
11 Pas. Jendela 52 x 122 cm Bh 10.000 441,711.87 4,417,118.69
12 Pas. Jendela 50 x 152 cm Bh 6.000 470,000.58 2,820,003.49
13 Pas. Jendela 40 x 165 cm Bh 2.000 431,086.03 862,172.05
14 Pas Jalusi 15 x 20 cm Bh 44.000 33,517.42 1,474,766.48
15 Pas. Glas Block Bening 20 x 20 cm Bh 57.000 39,807.50 2,269,027.50
Jumlah 89,021,543.84
V. PEKERJAAN PENUTUP ATAP
1 Pas. Atap Soka Blue M2 293.009 168,630.30 49,410,111.26
Jumlah 49,410,111.26
VI. PEKERJAAN INSTALASI LISTRIK
1 Lampu SL 23 Watt Ttk 16.000 147,259.50 2,356,152.00
2 Lampu SL 14 Watt Ttk 3.000 136,722.60 410,167.80
3 Lampu Hias Ttk 1.000 3,522,775.00 3,522,775.00
4 Stop Kontak Ttk 7.000 103,551.50 724,860.50
5 Saklar Ganda Ttk 6.000 107,145.20 642,871.20
6 Saklar Tunggal Ttk 7.000 102,776.00 719,432.00
7 Sekring Cast Ttk 1.000 130,507.00 130,507.00
8 Instalasi Listrik Dalam Ruangan Ls 1.000 5,000,000.00 5,000,000.00
Jumlah 13,506,765.50
VII. PEKERJAAN INSTALASI AIR
1 Bak air ukuran 80 x 80 x 80 cm camp 1:3 Unit 2.000 1,718,009.59 3,436,019.18
2 Pasangan Closet Duduk Porcelin BH 2.000 2,235,824.00 4,471,648.00
3 Septictank ukuran 2 x 1 x 1,8 cm, Pas. 1/2 Bata 1PC : 3PS Unit 1.000 3,992,203.06 3,992,203.06
4 Bak Peresapan Uk.1 x 1 m, jarak 1 m dari septictank Unit 1.000 1,013,025.00 1,013,025.00
5 Sumur Ls 1.000 10,000,000.00 10,000,000.00
6 Pompa Air Ls 1.000 950,000.00 950,000.00
5 Kran Air Bh 8.000 25,500.00 204,000.00
6 Floor Drain Bh 4.000 65,500.00 262,000.00
7 Instalasi air kotor Ls 1.000 400,000.00 400,000.00
8 Instalasi air bersih Ls 1.000 700,000.00 700,000.00
Jumlah 25,428,895.25
VIII. PEKERJAAN PENGECATAN
1 Cat Kilat Kayu M2 35.663 10,625.00 378,921.50
2 Cat Dinding M2 753.705 43,186.06 32,549,562.31
3 Cat Plafon M2 257.750 43,186.06 11,131,206.97
Jumlah 43,680,769.27
IX. PEKERJAAN FINISHING
1 Pembersihan Akhir Ls 1.000 700,000.00 700,000.00
Jumlah 700,000.00
Dibuat Oleh :
Perencana
TUTORIAL DARURAT
ANALISA HARGA SATUAN
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN TYPE 220 M2
LOKASI
H. SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp.) ( Rp.)
1 2 3 4 5 6
1 1 M' Pengukuran dan Pasang Bowplank
Balok Kayu Bus 0.0120 M3 2,500,000.00 30,000.00
Kayu Papan Bus 0.0070 M3 2,500,000.00 17,500.00
Paku Biasa Campur 2" - 5" 0.0200 KG 16,412.00 328.24
Pekerja kayu 0.1000 OH 85,000.00 8,500.00
Tukang kayu 0.1000 OH 112,000.00 11,200.00
Kepala Tukang Kayu 0.0100 OH 125,000.00 1,250.00
Jumlah 68,778.24
2 1 M3 Galian Tanah pondasi
Pekerja 0.9000 OH 85,000.00 76,500.00
Jumlah 76,500.00
3 1 M3 Urugan Tanah Kembali
Dihitung 1/3 kali Galian Tanah Pondasi 0.3333 OH 76,500.00 25,500.00
Jumlah 25,500.00
4 1 M3 Urugan Tanah Peninggian lantai dipadatkan
Tanah timbun 1.2000 M3 323,644.00 388,372.80
Pekerja 0.5000 OH 85,000.00 42,500.00
Jumlah 430,872.80
5 1 M3 Urugan Pasir dipadatkan + disiram
Pasir Urug 1.2000 M3 550,000.00 660,000.00
Pekerja 0.2500 OH 85,000.00 21,250.00
Jumlah 681,250.00
6 1 M2 Acian
Semen Portland (PC) @ 50 Kg 3.2500 KG 2,160.00 7,020.00
Pekerja pasir/batu 0.2000 OH 85,000.00 17,000.00
Tukang pasir/batu 0.1000 OH 112,000.00 11,200.00
Kepala tukang pasir/batu 0.0100 OH 125,000.00 1,250.00
Jumlah 36,470.00
7 1 M3 Cor Sloof 15/20 Beton Bertulang campuran 1PC : 3 PS
Campuran Beton :
Semen PC 11.5000 Zak 108,000.00 1,242,000.00
Pasir pasang ( Lokal) 1.2656 M3 550,000.00 696,080.00
Pekerja 6.0000 O/H 85,000.00 510,000.00
Tukang batu 1.0000 O/H 112,000.00 112,000.00
Kepala tukang batu 0.1000 O/H 125,000.00 12,500.00
Pembesian :
Besi beton dia 12 mm 227.6633 Kg 14,094.00 3,208,687.02
Besi beton dia 8 mm 62.3833 Kg 14,031.00 875,300.55
Kawat ikat 1.4178 Kg 19,275.00 27,328.15
Pekerja 4.061 O/H 85,000.00 345,155.53
Tukang besi 4.061 O/H 112,000.00 454,793.17
Kepala tukang besi 0.406 O/H 125,000.00 50,758.17
Begisting :
Papan kayu klas III 0.2667 M3 2,500,000.00 666,666.67
Balok kayu klas III 0.0533 M3 2,500,000.00 133,333.33
Paku campuran 3.2000 Kg 16,412.00 52,518.40
Pekerja 1.6000 O/H 85,000.00 136,000.00
Tukang kayu 4.0000 O/H 112,000.00 448,000.00
Kepala tukang kayu 0.4000 O/H 125,000.00 50,000.00
Pekerja bongkar begisting + siram 2.0000 O/H 85,000.00 170,000.00
Jumlah 9,191,121.00
Pembesian :
Besi beton dia 12 mm 148.678 Kg 14,094.00 2,095,469.07
Besi beton dia 8 mm 135.711 Kg 14,031.00 1,904,162.60
Kawat ikat 3.084 Kg 19,275.00 59,450.72
Pekerja 3.981 O/H 85,000.00 338,423.16
Tukang besi 3.981 O/H 112,000.00 445,922.28
Kepala tukang besi 0.398 O/H 125,000.00 49,768.11
Begisting :
Papan kayu klas III 0.324 M3 2,500,000.00 809,523.81
Balok kayu klas III 0.065 M3 2,500,000.00 161,904.76
Paku campuran 3.886 Kg 16,412.00 63,772.34
Pekerja 1.943 O/H 85,000.00 165,142.86
Tukang kayu 4.857 O/H 112,000.00 544,000.00
Kepala tukang kayu 0.486 O/H 125,000.00 60,714.29
Pekerja bongkar begisting + siram 2.000 O/H 85,000.00 170,000.00
Jumlah 9,440,833.99
H. SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp.) ( Rp.)
1 2 3 4 5 6
9 1 M3 Cor Balok Teras 15/20 Beton Bertulang campuran 1PC : 2 PS : 3 KR
Campuran Beton :
Semen PC 11.500 Zak 108,000.00 1,242,000.00
Pasir pasang ( Lokal) 0.450 M3 550,000.00 247,500.00
Kerikil / Batu Pecah 0.900 M3 1,850,000.00 1,665,000.00
Pekerja 6.000 O/H 85,000.00 510,000.00
Tukang batu 1.000 O/H 112,000.00 112,000.00
Kepala tukang batu 0.100 O/H 125,000.00 12,500.00
Mandor 0.300 O/H - -
Pembesian :
Besi beton dia 12 mm 130.093 Kg 14,094.00 1,833,535.44
Besi beton dia 8 mm 58.006 Kg 14,031.00 813,875.95
Kawat ikat 1.318 Kg 19,275.00 25,410.39
Pekerja 2.633 O/H 85,000.00 223,837.68
Tukang besi 2.633 O/H 112,000.00 294,939.06
Kepala tukang besi 0.263 O/H 125,000.00 32,917.31
Begisting :
Papan kayu klas III 0.367 M3 2,500,000.00 916,666.67
Balok kayu klas III 0.073 M3 2,500,000.00 183,333.33
Paku campuran 4.400 Kg 16,412.00 72,212.80
Pekerja 2.200 O/H 85,000.00 187,000.00
Tukang kayu 5.500 O/H 112,000.00 616,000.00
Kepala tukang kayu 0.550 O/H 125,000.00 68,750.00
Pekerja bongkar begisting + siram 2.000 O/H 85,000.00 170,000.00
Jumlah 9,227,478.62
10 1 M3 Cor Kolom 30/30 Beton Bertulang campuran 1PC : 2 PS : 3 KR
Campuran Beton :
Semen PC 11.500 Zak 108,000.00 1,242,000.00
Pasir pasang ( Lokal) 0.450 M3 550,000.00 247,500.00
Kerikil / Batu Pecah 0.900 M3 1,850,000.00 1,665,000.00
Pekerja 6.000 O/H 85,000.00 510,000.00
Tukang batu 1.000 O/H 112,000.00 112,000.00
Kepala tukang batu 0.100 O/H 125,000.00 12,500.00
Pembesian :
Besi beton dia 12 mm 86.729 Kg 14,094.00 1,222,356.96
Besi beton dia 8 mm 39.035 Kg 14,031.00 547,702.68
Kawat ikat 0.887 Kg 19,275.00 17,100.07
Pekerja 1.761 O/H 85,000.00 149,659.25
Tukang besi 1.761 O/H 112,000.00 197,198.07
Kepala tukang besi 0.176 O/H 125,000.00 22,008.71
Begisting :
Papan kayu klas III 0.267 M3 2,500,000.00 666,666.67
Balok kayu klas III 0.053 M3 2,500,000.00 133,333.33
Paku campuran 3.200 Kg 16,412.00 52,518.40
Pekerja 1.600 O/H 85,000.00 136,000.00
Tukang kayu 4.000 O/H 112,000.00 448,000.00
Kepala tukang kayu 0.400 O/H 125,000.00 50,000.00
Pekerja bongkar begisting + siram 2.000 O/H 85,000.00 170,000.00
Jumlah 7,601,544.15
11 1 M3 Cor Kolom 20/50 Beton Bertulang campuran 1PC : 2 PS : 3 Kr
Campuran Beton :
Semen PC 11.500 Zak 108,000.00 1,242,000.00
Pasir pasang ( Lokal) 0.450 M3 550,000.00 247,500.00
Kerikil / Batu Pecah 0.900 M3 1,850,000.00 1,665,000.00
Pekerja 6.000 O/H 85,000.00 510,000.00
Tukang batu 1.000 O/H 112,000.00 112,000.00
Kepala tukang batu 0.100 O/H 125,000.00 12,500.00
Pembesian :
Besi beton dia 16 mm 173.800 Kg 14,655.00 2,547,039.00
Besi beton dia 10 mm 65.299 Kg 13,575.00 886,436.19
Kawat ikat 1.484 Kg 19,275.00 28,605.49
Pekerja 3.347 O/H 85,000.00 284,528.01
Tukang besi 3.347 O/H 112,000.00 374,907.49
Kepala tukang besi 0.335 O/H 125,000.00 41,842.35
Begisting :
Papan kayu klas III 0.280 M3 2,500,000.00 700,000.00
Balok kayu klas III 0.056 M3 2,500,000.00 140,000.00
Paku campuran 3.360 Kg 16,412.00 55,144.32
Pekerja 1.680 O/H 85,000.00 142,800.00
Tukang kayu 4.200 O/H 112,000.00 470,400.00
Kepala tukang kayu 0.420 O/H 125,000.00 52,500.00
Pekerja bongkar begisting + siram 2.000 O/H 85,000.00 170,000.00
Jumlah 9,683,202.85
H. SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp.) ( Rp.)
1 2 3 4 5 6
12 1 M3 Cor Kolom Praktis 15/15 Beton Bertulang campuran 1PC : 3 PS
Campuran Beton :
Semen PC 11.500 Zak 108,000.00 1,242,000.00
Pasir pasang ( Lokal) 0.450 M3 550,000.00 247,500.00
Pekerja 6.000 O/H 85,000.00 510,000.00
Tukang batu 1.000 O/H 112,000.00 112,000.00
Kepala tukang batu 0.100 O/H 125,000.00 12,500.00
Pembesian :
Besi beton dia 12 mm 173.458 Kg 14,094.00 2,444,713.92
Besi beton dia 8 mm 62.748 Kg 14,031.00 880,419.27
Kawat ikat 1.426 Kg 19,275.00 27,487.97
Pekerja 3.307 O/H 85,000.00 281,085.05
Tukang besi 3.307 O/H 112,000.00 370,370.89
Kepala tukang besi 0.331 O/H 125,000.00 41,336.04
Begisting :
Papan kayu klas III 0.533 M3 2,500,000.00 1,333,333.33
Balok kayu klas III 0.107 M3 2,500,000.00 266,666.67
Paku campuran 6.400 Kg 16,412.00 105,036.80
Pekerja 3.200 O/H 85,000.00 272,000.00
Tukang kayu 8.000 O/H 112,000.00 896,000.00
Kepala tukang kayu 0.800 O/H 125,000.00 100,000.00
Pekerja bongkar begisting + siram 2.000 O/H 85,000.00 170,000.00
Jumlah 9,312,449.93
13 1 M3 Cor Plat Dak Teras Beton Bertulang campuran 1PC : 2 PS : 3 Kr
Semen Portland (PC) @ 50 Kg 11.5000 Zak 108,000.00 1,242,000.00
Pasir semen (lokal) 0.4500 M3 550,000.00 247,500.00
Kerikil / Batu Pecah 0.9000 M3 1,850,000.00 1,665,000.00
Kepala tukang pasir/batu 0.1000 OH 125,000.00 12,500.00
Tukang pasir/batu 1.0000 OH 112,000.00 112,000.00
Pekerja pasir/batu 6.0000 OH 85,000.00 510,000.00
Besi tulangan beton dia. 12 mm 142.6473 KG 14,094.00 2,010,471.61
Kawat ikat besi beton 3.2420 KG 19,275.00 62,489.26
Kepala tukang besi 0.1997 OH 125,000.00 24,963.28
Tukang besi 1.9971 OH 112,000.00 223,671.03
Pekerja besi 1.9971 OH 85,000.00 169,750.33
Papan begesting kayu bus 0.4000 M3 2,500,000.00 1,000,000.00
Patok kayu bus 0.0800 M3 2,500,000.00 200,000.00
Paku campuran 0.4000 KG 16,412.00 6,564.80
Kepala tukang kayu 0.5000 OH 125,000.00 62,500.00
Tukang kayu 5.0000 OH 112,000.00 560,000.00
Pekerja kayu 2.0000 OH 85,000.00 170,000.00
Jumlah 8,279,410.32
14 1 M3 Cor lantai 1 Pc : 3 Ps
Semen Portland (PC) @ 50 Kg 9.6000 Zak 108,000.00 1,036,800.00
Pasir semen (lokal) 1.0800 M3 550,000.00 594,000.00
Kepala tukang pasir/batu 0.1000 OH 125,000.00 12,500.00
Tukang pasir/batu 1.0000 OH 112,000.00 112,000.00
Pekerja pasir/batu 6.0000 OH 85,000.00 510,000.00
Jumlah 2,265,300.00
15 1 M3 Pasangan Batu Bata 1 PC : 4PS
Bata merah (5 x 10 x 20) cm 735.0000 Buah 1,100.00 808,500.000
Semen Portland (PC) @ 50 Kg 2.5400 Zak 108,000.00 274,320.00
Pasir semen (lokal) 0.3800 M3 550,000.00 209,000.00
Pekerja pasir/batu 3.6000 OH 85,000.00 306,000.000
Tukang pasir/batu 1.5000 OH 112,000.00 168,000.000
Kepala tukang pasir/batu 0.1500 OH 125,000.00 18,750.000
Jumlah 1,784,570.000
16 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1PC : 3PS
Bata merah (5 x 11 x 22) cm 70.0000 Buah 1,100.00 77,000.000
Semen Portland (PC) @ 50 Kg 0.5748 KG 108,000.00 62,078.400
Pasir semen (lokal) 0.0400 M3 550,000.00 22,000.000
Pekerja pasir/batu 0.3000 OH 85,000.00 25,500.000
Tukang pasir/batu 0.1000 OH 112,000.00 11,200.000
Kepala tukang pasir/batu 0.0100 OH 125,000.00 1,250.000
Jumlah 199,028.400
17 1 M2 Plesteran 1 PC : 3 PS Tebal 15 mm
Semen Portland (PC) @ 50 Kg 7.7760 KG 2,160.00 16,796.16
Pasir semen (lokal) 0.0230 M3 550,000.00 12,650.00
Pekerja pasir/batu 0.3000 OH 85,000.00 25,500.00
Tukang pasir/batu 0.1500 OH 112,000.00 16,800.00
Kepala tukang pasir/batu 0.0150 OH 125,000.00 1,875.00
Jumlah 73,621.16
H. SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp.) ( Rp.)
1 2 3 4 5 6
30 1 Bh Glas Block 20 x 20 cm
Glas Block 20 x 20 cm 1.0000 Bh 25,500.00 25,500.00
Pekerja Kayu 0.1000 OH 125,000.00 12,500.00
Tukang Kayu 0.0150 OH 112,000.00 1,680.00
Kepala Tukang 0.0015 OH 85,000.00 127.50
Jumlah 39,807.50
31 1 bh Jendela panil kaca Kaca tebal 3 cm ukuran 52 x 122 cm
Papan kayu Rahay 0.011 M3 3,275,000.00 34,817.34
Kaca polos tebal 5 mm 0.506 M2 210,500.00 106,513.00
Tarikan jendela aluminium 2.000 Buah 5,195.00 10,390.00
Kait angin 9" 2.000 Buah 9,940.00 19,880.00
Grendel jendela 1.000 Buah 11,935.00 11,935.00
Paku 1" 0.015 KG 20,675.00 310.13
Paku 2" 0.050 KG 17,328.00 866.40
Kepala tukang kayu 0.250 OH 125,000.00 31,250.00
Tukang kayu 1.750 OH 112,000.00 196,000.00
Pekerja kayu 0.350 OH 85,000.00 29,750.00
Jumlah 441,711.87
32 1 bh Jendela panil kaca Kaca tebal 3 cm ukuran 50 x 152 cm
Papan kayu Rahay 0.012 M3 3,275,000.00 40,835.16
Kaca polos tebal 5 mm 0.612 M2 210,500.00 128,783.90
Tarikan jendela aluminium 2.000 Buah 5,195.00 10,390.00
Kait angin 9" 2.000 Buah 9,940.00 19,880.00
Grendel jendela 1.000 Buah 11,935.00 11,935.00
Paku 1" 0.015 KG 20,675.00 310.13
Paku 2" 0.050 KG 17,328.00 866.40
Kepala tukang kayu 0.250 OH 125,000.00 31,250.00
Tukang kayu 1.750 OH 112,000.00 196,000.00
Pekerja kayu 0.350 OH 85,000.00 29,750.00
Jumlah 470,000.58
33 1 bh Jendela panil kaca Kaca tebal 3 cm ukuran 40 x 165 cm
Papan kayu Rahay 0.013 M3 3,275,000.00 43,557.50
Kaca polos tebal 5 mm 0.414 M2 210,500.00 87,147.00
Tarikan jendela aluminium 2.000 Buah 5,195.00 10,390.00
Kait angin 9" 2.000 Buah 9,940.00 19,880.00
Grendel jendela 1.000 Buah 11,935.00 11,935.00
Paku 1" 0.015 KG 20,675.00 310.13
Paku 2" 0.050 KG 17,328.00 866.40
Kepala tukang kayu 0.250 OH 125,000.00 31,250.00
Tukang kayu 1.750 OH 112,000.00 196,000.00
Pekerja kayu 0.350 OH 85,000.00 29,750.00
Jumlah 431,086.03
30 1 M2 Atap Soka Gelombang Blue
Atap Soka Gelombang Blue 1.1000 M2 64,000.00 70,400.00
Paku Seng 0.0200 KG 24,015.00 480.30
Pekerja 0.1500 OH 85,000.00 12,750.00
Tukang Kayu 0.7500 OH 112,000.00 84,000.00
Kepala Tukang 0.0080 OH 125,000.00 1,000.00
Jumlah 168,630.30
H. SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp.) ( Rp.)
1 2 3 4 5 6
31 1 M2 Cat Dinding / Plafon
Cat tembok 0.300 KG 10,450.00 3,135.00
Mandor cat 0.0100 OH 0.00 -
Kepala tukang cat 0.100 OH 125,000.00 12,500.00
Tukang cat 0.150 OH 112,000.00 16,800.00
Pekerja cat 0.125 OH 85,000.00 10,625.00
Jumlah 43,186.06
32 1 M2 Rangka Plafon + Penggantung
Balok Kayu Kelas II (Kayu Rahay) 0.0100 M3 3,125,000.00 31,250.00
Paku Campuran 0.1200 KG 16,412.00 1,969.44
Pekerja Kayu 0.1700 OH 85,000.00 14,450.00
Tukang Kayu 0.2700 OH 112,000.00 30,240.00
Jumlah 81,284.44
33 1 M2 Plafond Tripleks
Triplek ukuran (120 x 240) cm tebal 3 mm 0.3750 Lembar 68,055.00 25,520.63
Paku Triplek 0.0300 KG 20,675.00 620.25
Pekerja Kayu 0.1000 OH 85,000.00 8,500.00
Tukang Kayu 0.1000 OH 112,000.00 11,200.00
Kepala Tukang 0.0100 OH 125,000.00 1,250.00
Jumlah 47,090.88
34 1 M1 List Plafond (lebar list 4 cm tebal 2 cm)
List kayu 1.000 M1 5,500.00 5,500.00
Paku 0.010 KG 16,412.00 164.12
Pekerja 0.020 OH 85,000.00 1,700.00
Tukang 0.025 Oh 112,000.00 2,800.00
Kepala tukang 0.0025 OH 125,000.00 312.50
Jumlah 10,476.62
Dibuat Oleh :
Perencana
TUTORIAL DARURAT
HARGA SATUAN BAHAN DAN UPAH
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN TYPE 220 M2
LOKASI
1 2 3 4
I UPAH
1 Pekerja OH 85,000.00
2 Tukang OH 112,000.00
3 Kepala tukang OH 125,000.00
II BAHAN
1 Amplas Lbr 4,850.00
2 Atap Soka Blue Lbr 64,000.00
3 Batu bata Bh 1,100.00
4 Balok kayu kelas II M3 3,125,000.00
5 Besi Dia. 16 mm Kg 14,655.00
6 Besi Dia. 12 mm Kg 14,094.00
7 Besi Dia. 10 mm Kg 13,575.00
8 Besi Dia. 8 mm Kg 14,031.00
9 Cat tembok Kg 10,450.00
10 Dempul Kg 26,750.00
11 Closet Duduk Porselin Komplet Storage Bak Bh 1,813,990.00
12 Tarikan Jendela 3 " Bh 5,195.00
13 Engsel 4 " Kuningan Pasang 26,795.00
14 Kunci Tanam Set 75,053.00
15 Pintu Fiber KM Set 550,000.00
16 Glas Blok 20 x 20 cm Bh 25,500.00
17 Grendel Pintu Bh 47,975.00
18 Grendel Jendela Bh 11,935.00
19 Kaca Polos 5 mm M2 210,500.00
20 Kait angin 9" Bh 9,940.00
21 Kawat Ikat Beton Kg 19,275.00
22 Kayu Kelas II Ukuran 2/4 cm M1 5,500.00
23 Balok Kayu kelas III M3 2,500,000.00
24 Kabel NYM 2,5 x 2 M1 8,290.00
25 Keramik 30 x 30 cm ( Polos ) Bh 5,943.00
26 Keramik 30 x 30 cm ( Berglasir ) Bh 6,243.00
27 Keramik 30 x 30 cm ( Mozaik ) Bh 7,285.00
28 Keramik 20 x 20 cm ( Anti Slip ) Bh 2,750.00
29 Kerikil / Batu Pecah Import M3 1,670,000.00
30 Lampu Hias Set 3,125,250.00
31 Lampu SL 23 Watt Bh 45,035.00
32 Lampu SL 14 Watt Bh 35,456.00
33 Papan kayu kelas III M3 2,500,000.00
34 Paku 1'' Kg 20,675.00
35 Paku 2'' Kg 17,328.00
36 Paku campur Kg 16,412.00
37 Paku seng Kg 24,015.00
38 Pasir Lokal M3 550,000.00
39 Tanah Timbun Biasa M3 130,383.00
40 Plamur Tembok Kg 6,303.00
41 Papan kayu kelas II M3 3,275,000.00
42 Semen Pordland @ 50 Kg Zak 108,000.00
43 Semen warna Kg 3,015.00
44 Kerikil / Batu Pecah Import M3 1,850,000.00
45 Seltip Bh 5,000.00
46 Tanah Timbun Selmat M3 323,644.00
47 Triplek 3 mm Lbr 68,055.00
48 Seng Plat BJLS 0,2 mm Lbr 46,694.00
NO JENIS BAHAN DAN UPAH SATUAN HARGA BAHAN
1 2 3 4
49 Pipa PVC 3/4 " M1 7,210.00
50 Pipa PVC 1 " M1 9,957.00
51 Pipa PVC 2" M1 17,133.00
52 Pipa PVC 4" M1 39,021.00
53 Kran Air 3/4" Bh 25,500.00
54 Floor Drain Bh 65,500.00
55 Stop Kontak Bh 16,865.00
56 Saklar Tunggal Bh 16,160.00
57 Saklar Ganda Bh 20,132.00
58 Viting Bh 12,721.00
59 Sekring Cast Bh 30,338.00
Dibuat Oleh :
Perencana
-
TUTORIAL DARURAT