HARGA STANDAR KOMODITAS MINERAL BUKAN LOGAM BATUAN

NO BATUAN HARGA TON/KG %


1 Andesit 8,400 Ton 25% 2,100
2 Batu Apung 18,000 Ton 25% 4,500
3 Batu Gamping/Kapur 9,200 Ton 25% 2,300
4 Batu Bronjol/Ares 12,000 Ton 25% 3,000
5 Batu Split 9,000 Ton 25% 2,250
6 Batu Sela(Damar) 9,000 Ton 25% 2,250
7 Bentonit 16,500 Ton 25% 4,125
8 Ballclay/Bondclay 9,000 Ton 25% 2,250
9 Diabas 9,000 Ton 25% 2,250
10 Dasit Hijau 9,000 Ton 25% 2,250
11 Fosfat 21,600 Ton 25% 5,400
12 Feldspar 22,000 Ton 25% 5,500
13 Gabro 9,000 Ton 25% 2,250
14 Jasper 9,000 Ton 25% 2,250
15 Kaolin 18,000 Ton 25% 4,500
16 Kalsit 9,000 Ton 25% 2,250
17 Kalsedon/Agate :
a. Kualitas 1 75,000 Kg 25% 18,750
b. Kualitas II 18,750 Kg 25% 4,688
c. Kualitas III 250 Kg 25% 63
18 Kristal Kuarsa 9,000 Ton 25% 2,250
19 Tanah Liat : Ton
a. Tanah Liat Super 21,600 Ton 25% 5,400
b.Tanah Liat Putih 18,000 Ton 25% 4,500
c. Tanah Liat Coklat 7,000 Ton 25% 1,750
d. Tanah Liat Merah 7,200 Ton 25% 1,800
e. Tanah Liat Genteng 5,400 Ton 25% 1,350
20 Tanah Urug 9,000 Ton 25% 2,250
21 Marmer 30,000 Ton 25% 7,500
22 Pasir : Ton
a. Pasir Beton 10,400 Ton 25% 2,600
b. Pasir Pasang 7,000 Ton 25% 1,750
c. Pasir Laut 18,000 Ton 25% 4,500
23 Batu Pasir Kuarsa 19,200 Ton 25% 4,800
24 Perlit/Obsidian 15,000 Ton 25% 3,750
25 Rijang 9,000 Ton 25% 2,250
26 Sirtu(Pasir Batu) 8,000 Ton 25% 2,000
27 Serpentin 9,000 Ton 25% 2,250
28 Trass 11,000 Ton 25% 2,750
29 Toseki 9,000 Ton 25% 2,250
30 Zeolit 15,000 Ton 25% 3,750
Total
Jenis Bahan Jenis
Sumberdaya
Galian Sumberdaya
(BCM)

Soil Terukur 7,360


Overburden Terukur 13,788
Breksi Tufaan Terukur 382,264
Andesit Terukur 1,070,296.20

Sumberdaya
Bahan Galian Tereka Terunjuk Terukur
BCM Ton BCM Ton BCM
Soil 10,598 26,496 8,832 22,080 7,360
Overburden 19,855 49,637 16,546 41,364 13,788
Breksi Tufaan 550,460 1,376,150 458,717 1,146,792 382,264
Andesit 1,541,227 3,853,066 1,284,355 3,210,889 1,070,296

Rencana Produksi
Tahun ke- Soil (BCM) Overburden (BCM) Andesit (BCM)
1 3,000 6,000 71,000 63,900 5,325
2 4,360 7,788 71,000 63,900 5,325
3 - - 71,000 63,900 5,325
4 - - 71,000 63,900 5,325
5 - - 71,000 63,900 5,325
6 - - 71,000 63,900 5,325
7 - - 71,000 63,900 5,325
8 - - 71,000 63,900 5,325
9 - - 71,000 63,900 5,325
10 - - 71,000 63,900 5,325
Total 7,360 13,788 710,000 639,000 53,250
Penggolonga Total
n Jenis Sumberdaya
Sumberdaya
(BCM)
Soil 7,360 2.5
OB 13,788

Andesit 1,452,560.20

Cadangan
Terukur Bahan Galian Terkira Terbukti
Luas
Ton BCM Ton BCM Ton
55,200 Andesit 852,000 2,130,000 710,000 1,775,000
103,410
3.43
2,866,980
8,027,222

213 0.9