HARGA SATUAN JUMLAH HARGA

NO URAIAN PEKERJAAN SAT VOLUME


( Rp ) ( Rp )
1 2 3 4 5 6

1 PEKERJAAN AWAL
Pekerjaan Camp ls 1.00 12,000,000.00 12,000,000.00
Bouwplank m1 46.00 70,050.00 3,222,300.00
-
2 PEKERJAAN PONDASI -
Galian Pondasi m3 24.28 61,000.00 1,480,836.00
Pondasi Batu Gunung m3 8.82 1,136,987.50 10,028,229.75
Pembesian Pondasi Tapak + Kolom Pedestal kg 918.19 19,033.00 17,475,948.34
Pengecoran Pondasi Tapak + Kolom Pedestal m3 3.78 2,418,839.50 9,143,213.31
Lantai Kerja Pondasi Tapak m3 0.77 1,199,385.00 921,127.68
Titik Pancang Mangi2 Dia. 10cm titik 120.00 97,500.00 11,700,000.00
Lantai Kerja Sloof m3 0.60 1,199,385.00 713,634.08
Pembesian Sloof m3 797.12 19,033.00 15,171,559.58
Pengecoran Sloof m3 3.83 2,418,839.50 9,252,061.09
Pembesian Balok kg 2,217.14 19,033.00 42,198,856.97
Pengecoran Balok m3 9.80 2,418,839.50 23,692,532.90
Pengecoran dakk + Pembesian m3 16.50 5,873,789.50 96,917,526.75
Pembesian Kolom kg 1,024.00 19,033.00 19,489,792.00
Pengecoran Kolom m3 5.88 2,418,839.50 14,222,776.26
3 PEKERJAAN PASANGAN'
Pasangan bata m2 166.90 204,787.50 34,179,033.75
Plesteran m2 401.00 78,097.25 31,316,997.25
Acian m2 461.00 55,220.00 25,456,420.00
4 PEKERJAAN CAT
Cat Dinding Interior m2 356.50 45,468.82 16,209,635.76
Cat Dinding Exterior m2 94.50 59,398.80 5,613,186.60
Cat Plafon m2 66.00 38,468.82 2,538,942.38
Pemasangan Gypsum m2 66.00 158,000.00 10,428,000.00
5 PEKERJAAN KERAMIK
Keramik Lantai Rumah 40 x 40 m2 56.00 285,522.50 15,989,260.00
Plur Parkiran m3 3.08 1,199,385.00 3,694,105.80
Keramik Lantai KM m2 10.00 259,966.94 2,599,669.44
Keramik dinding KM (T : 1.5M) m2 27.00 309,522.94 8,357,119.50
6 PEKERJAAN SANITARY
Instalasi Kran Air 1/2" ls 2.00 175,000.00 350,000.00
Instalalsi Kloset Duduk ex TOTO ls 2.00 2,950,000.00 5,900,000.00
Instalasi Air Bersih 1/2" m1 18.50 24,810.00 458,985.00
Instalasi Pipa Air Kotor 4" m1 16.00 147,697.00 2,363,152.00
Instalasi Pipa Air Kotor 3" m1 35.00 99,240.00 3,473,400.00
Septictank ls 1.00 12,336,664.28 12,336,664.28
Instalasi Floor Drain Stainless ls 2.00 257,500.00 515,000.00
7 Instalasi Listrik
Instalasi Lampu Downlight titik 12.00 330,000.00 3,960,000.00
Instalasi Stopkontak titik 6.00 295,000.00 1,770,000.00
Instlasi Limit Grup ls 1.00 2,500,000.00 2,500,000.00
Instalasi Groudning ls 1.00 4,000,000.00 4,000,000.00

Profil tank 2.200 ls 1.00 3,750,000.00 3,750,000.00


Pagar Teralis Jemuran m2 7.20 485,000.00 3,492,000.00

488,881,972.47
480,000,000.00