1 2 3
TERBILANG:
Diperiksa,
PEJABAT PEMBUAT KOMITMEN KOSULTAN PERENC
(PPK) PT. INOVASI KONSULIND
NURHAYANA A. HERMAN B, S
NIP. 19601231 198012 2 012
JUMLAH
1,750,000.00
6,000,019.94
23,568,487.71
500,000.00
31,818,507.65
3,181,850.76
35,000,358.41
35,000,000.00
Dihitung,
KOSULTAN PERENCANA
PT. INOVASI KONSULINDO RAYA
A. HERMAN B, ST
Direktur
Harga Satuan
No. Uraian Pekerjaan Sat
Rp / Sat. Volume
1 2 3 4
1 2 3
TERBILANG:
Diperiksa, Dihitung,
KASI PERENCANAAN KECIPTA KARYAAN PERENCANA
2018
JUMLAH
-
-
-
826,688.92
409,546.24
750,000.00
1,986,235.15
198,623.52
2,184,858.67
2,100,000.00
Dihitung,
PERENCANA
HARGA SATUAN
No. KELOMPOK/JENIS PEKERJAAN SAT VOLUME
Rp / Sat. Volume
1 2 3 4 5
18
JUMLAH HARGA
VOLUME
Rp
5 6
1.00 500,000.00
1.00 750,000.00
1.00 500,000.00
JUMLAH 1,750,000.00
1.00 17,820.00
1.00 79,750.00
1.00 106,128.00
1.00 202,170.10
1.00 276,551.00
1.00 165,220.55
JUMLAH
1.00 826,688.92
1.00 409,546.24
JUMLAH 1,236,235.15
1.00 1,189,820.65
1.00 1,299,333.74
1.00 1,313,821.43
1.00 1,346,676.90
1.00 14,619.16
1.00 360,266.58
1.00 59,236.16
1.00 70,334.29
1.00 222,674.29
1.00 214,041.82
1.00 110,047.07
1.00 101,967.92
JUMLAH
1.00 290,448.40
JUMLAH 290,448.40
1.00 750,000.00
JUMLAH 750,000.00
TOTAL
BACK UP DATA
0.20 + 0.35
= x 0.50 x 60.02
2
= 8.25 m3
LA + LB
Kiri = x Tinggi x Panjang
2
0.20 + 0.35
= x 0.50 x 60.02
2
= 8.25 m3
Plesteran = A1 + D1 + L + A2 + D2
= 0.20 + 0.50 + 0.30 + 0.20 + 0.50
= 1.70 X 60.02
= 102.03 m2
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
DIVISI 2 - SITEWORK
2.1 Setting-out
2.2.1.4 Pengukuran dan Pemasangan 1 m2 Bouwplank
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.100 92,000.00
Tukang Kayu L.02 OH
0.100 130,000.00
Kepala Tukang L.03 OH
0.010 130,000.00
Mandor L.04 OH
0.005 140,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 m3
0.012 2,205,000.00
Paku 2”-3” Kg
0.020 21,344.40
Kayu papan 3/20 m3
0.007 2,590,875.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
10% x D
E Overhead & Profit
Harga Satuan Pekerjaan (D+E)
F
2.3.1Pekerjaan Tanah
2.3.1.1. Penggalian Tanah Biasa Sedalam 1 m
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01
OH 0.750 92,000.00
Mandor L.04
OH 0.025 140,000.00
JUMLAH TENAGA KERJA
B BAHAN
- -
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
10% x D
E Overhead & Profit
Harga Satuan Pekerjaan (D+E)
F
2.3.1.4 Penggalian Tanah Keras Sedalam 1 m
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01
OH 1.000 92,000.00
Mandor L.04
OH 0.032 140,000.00
JUMLAH TENAGA KERJA
B BAHAN
- -
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
10% x D
E Overhead & Profit
Harga Satuan Pekerjaan (D+E)
F
4.4.2Pekerjaan Plesteran
4.4.2.4. Pemasangan Plesteran 1PC : 4PP Tebal 15 mm
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.300 92,000.00
Tukang Batu L.03 OH
0.150 130,000.00
Kepala Tukang L.03 OH
0.015 130,000.00
Mandor L.04 OH
0.015 140,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg
6.240 1,261.26
Pasir Pasang m3
0.024 205,000.00
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
10% x D
E Overhead & Profit
Harga Satuan Pekerjaan (D+E)
F
4.4.3Pekerjaan Penutup Lantai & Penutup Dinding
4.4.3.64a. Pemasangan 1 m2 Paving Block K-300 tebal 8 cm natural
No. Uraian Kode Satuan Koefisien Harga Satuan
A TENAGA
Pekerja L.01 OH
0.500 92,000.00
L.02 OH
Tukang 0.500 130,000.00
Kepala tukang L.03 OH
0.050 130,000.00
Mandor L.04 OH
0.0013 140,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving Block K 300 t=8 cm m2 1.010 74,970.00
Pasir Urug m2 0.070 128,992.50
JUMLAH HARGA BAHAN
C PERALATAN
- -
JUMLAH HARGA ALAT
Jumlah (A+B+C)
D
10% x D
E Overhead & Profit
Harga Satuan Pekerjaan (D+E)
F
DIVISI 2 - SITEWORK
Jumlah Harga
9,200.00
13,000.00
1,300.00
700.00
24,200.00
26,460.00
426.89
18,136.13
45,023.01
-
-
69,223.01
6,922.30
76,145.31
Jumlah Harga
9,200.00
7,000.00
16,200.00
-
-
-
-
16,200.00
1,620.00
17,820.00
Jumlah Harga
69,000.00
3,500.00
72,500.00
-
-
-
-
72,500.00
7,250.00
79,750.00
Jumlah Harga
92,000.00
4,480.00
96,480.00
-
-
-
-
96,480.00
9,648.00
106,128.00
Jumlah Harga
27,600.00
1,400.00
29,000.00
154,791.00
154,791.00
-
-
183,791.00
18,379.10
202,170.10
Jumlah Harga
23,000.00
3,500.00
26,500.00
224,910.00
224,910.00
-
-
251,410.00
25,141.00
276,551.00
Jumlah Harga
23,000.00
3,500.00
26,500.00
123,700.50
123,700.50
-
-
150,200.50
15,020.05
165,220.55
Jumlah Harga
138,000.00
97,500.00
9,750.00
10,500.00
255,750.00
183,600.00
205,585.38
106,600.00
495,785.38
-
-
751,535.38
75,153.54
826,688.92
Jumlah Harga
71,760.00
50,700.00
5,070.00
5,460.00
132,990.00
183,600.00
55,724.76
239,324.76
-
-
372,314.76
37,231.48
409,546.24
Jumlah Harga
151,800.00
35,750.00
3,640.00
11,620.00
202,810.00
348,107.76
182,160.00
241,077.38
107,500.00
878,845.14
-
-
1,081,655.14
108,165.51
1,189,820.65
Jumlah Harga
151,800.00
35,750.00
3,640.00
11,620.00
202,810.00
467,927.46
153,560.00
249,415.03
107,500.00
978,402.49
-
-
1,181,212.49
118,121.25
1,299,333.74
Jumlah Harga
151,800.00
35,750.00
3,640.00
11,620.00
202,810.00
484,323.84
152,240.00
247,509.28
107,500.00
991,573.12
-
-
1,194,383.12
119,438.31
1,313,821.43
Jumlah Harga
151,800.00
35,750.00
3,640.00
11,620.00
202,810.00
520,900.38
149,820.00
243,221.34
107,500.00
1,021,441.72
-
-
1,224,251.72
122,425.17
1,346,676.90
Jumlah Harga
6,440.00
9,100.00
910.00
560.00
17,010.00
112,289.63
3,601.87
115,891.49
-
-
132,901.49
13,290.15
146,191.64
14,619.16
Jumlah Harga
60,720.00
42,900.00
4,290.00
4,620.00
112,530.00
103,635.00
8,537.76
1,222.45
54,573.75
32,683.61
14,332.50
214,985.07
-
-
327,515.07
32,751.51
360,266.58
Jumlah Harga
18,400.00
13,000.00
4,290.00
840.00
36,530.00
4,268.88
12,954.38
97.80
17,321.05
-
-
53,851.05
5,385.11
59,236.16
Jumlah Harga
27,600.00
19,500.00
1,950.00
2,100.00
51,150.00
7,870.26
4,920.00
12,790.26
-
-
63,940.26
6,394.03
70,334.29
asangan 1 m2 Paving Block K-300 tebal 8 cm natural
Jumlah Harga
46,000.00
65,000.00
6,500.00
182.00
117,682.00
75,719.70
9,029.48
84,749.18
-
-
202,431.18
20,243.12
222,674.29
46,000.00
65,000.00
6,500.00
182.00
117,682.00
67,872.00
9,029.48
76,901.48
-
-
194,583.48
19,458.35
214,041.82
Jumlah Harga
11,385.00
8,937.50
2,165.63
22,488.13
70,875.00
4,495.13
2,184.53
77,554.66
-
-
100,042.79
10,004.28
110,047.07
Jumlah Harga
11,592.00
9,100.00
2,205.00
22,897.00
63,000.00
4,576.86
2,224.25
69,801.11
-
-
92,698.11
9,269.81
101,967.92
Jumlah Harga
11,684.00
8,190.00
780.00
840.00
21,494.00
242,550.00
242,550.00
-
-
264,044.00
26,404.40
290,448.40
HARGA SATUAN BAHAN DAN UPAH
KABUPATEN MAROS
KETERANGAN
- Untuk wilayah yang tidak terjangkau kendaraan roda empat,
biaya angkut ke lokasi proyek dapat dihitung tersendiri.
- Khusus untuk daerah yang tidak ada air kerja, biaya air kerja dapat diperhitungkan sendiri oleh perencan
HARGA SATUAN BAHAN DAN UPAH
KABUPATEN MAROS
131,250.00
288,750.00
139,650.00
98,175.00
0.00
0.00
122,850.00
157,500.00
288,750.00
317,625.00
178,500.00
162,750.00
231,000.00
60,060.00
86,625.00
48,300.00 1,207.50
519.75
51,975.00
57,750.00
63,525.00
71,400.00
80,850.00
104,181.00
106,837.50
46,200.00
51,975.00
138,600.00
0.00
0.00
35,227.50
40,425.00
23,100.00
34,650.00
0.00
HARGA BARANG (Rp) KET.
4 5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
837,375.00
10,500.00
HARGA BARANG (Rp) KET.
4 5
###
7,507,500.00
###
8,085,000.00
###
5,775,000.00
4,200,000.00
3,780,000.00
3,465,000.00
2,467,500.00
2,100,000.00
2,625.00
2,782.50
3,150.00
3,675.00
3,937.50
17,787.00
38,115.00
57,172.50
82,582.50
109,263.00
171,517.50
203,280.00
279,510.00
317,625.00
123,375.00
166,425.00
289,275.00
20,328.00
25,410.00
25,410.00
21,852.60
HARGA BARANG (Rp) KET.
4 5
26,680.50
31,762.50
19,057.50
25,410.00
12,705.00
2,286.90
127.05
158.81
254.10
349.39
476.44
889.35
22,869.00
25,410.00
19,057.50
171,517.50
HARGA BARANG (Rp) KET.
4 5
28,875.00
29,106.00
4,725.00
4,725.00
10,710.00
13,650.00
3,580,500.00
23,100.00
23,100.00
3,465.00
28,875.00
85,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
130,000.00
120,000.00
85,000.00
120,000.00
85,000.00
120,000.00
85,000.00
85,000.00
85,000.00
daerah yang tidak ada air kerja, biaya air kerja dapat diperhitungkan sendiri oleh perencana
HARGA SATUAN BAHAN DAN UPAH
KABUPATEN MAROS
137,812.50
301,875.00
153,000.00
103,083.75
205,000.00
128,992.50
286,000.00
333,506.25
187,425.00
170,887.50
242,550.00
1,261.26
1,819.13
1,267.88
544.95
63,000.00
67,200.00
68,250.00
74,970.00
76,650.00
84,000.00
99,750.00
64,050.00
67,200.00
26,250.00
5,250.00
5,775.00
36,988.88
42,446.25
24,255.00
36,382.50
29,400.00
31,500.00
28,350.00
141,750.00
209,475.00 ###
252,000.00 ###
HARGA BARANG (Rp) KET.
4 5
299,250.00 ###
330,750.00 ###
378,000.00 ###
441,000.00 ###
6,300.00
147,000.00
220,500.00
420,000.00
472,500.00
15,750.00 ###
18,900.00
21,000.00
26,250.00
31,500.00
HARGA BARANG (Rp) KET.
4 5
36,750.00
###
7,882,875.00
###
8,489,250.00
###
6,058,500.00
4,410,000.00
3,969,000.00
3,638,250.00
2,590,875.00
2,205,000.00
2,756.25
2,921.63
3,307.50
3,858.75
4,134.38
18,676.35
40,020.75
60,031.13
86,711.63
114,726.15
180,093.38
213,444.00
293,485.50
333,506.25
129,543.75
174,746.25
303,738.75
21,344.40
26,680.50
26,680.50
22,945.23
28,014.53
HARGA BARANG (Rp) KET.
4 5
33,350.63
20,010.38
26,680.50
13,340.25
2,401.25
133.40
166.75
266.81
366.86
500.26
933.82
24,012.45
26,680.50
19,950.00
180,093.38
24,012.45
24,012.45
24,012.45
375,375.00
787,500.00
4,273,500.00
24,012.45
26,680.50
42,688.80
38,953.53
49,625.73
58,296.89
100,051.88
166,753.13
280,145.25
182,155.05
188,218.80
103,326.30
121,498.65
21,829.50
133,402.50
1,091,475.00
23,625.00
42,446.25
30,450.00
25,200.00
1,470.00
HARGA BARANG (Rp) KET.
4 5
0.00
0.00
28,875.00
26,250.00
10,694.25
11,884.95
26,250.00
30,318.75
30,561.30
5,650.00
6,950.00
11,245.50
14,332.50
3,759,525.00
24,255.00
24,255.00
3,638.25
30,318.75
6,112.26
500.00
HARGA BARANG (Rp) KET.
4 5
92,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
140,000.00
130,000.00
92,000.00
130,000.00
92,000.00
130,000.00
92,000.00
92,000.00
92,000.00
HARGA SATUAN ELEMEN STRUKTUR BETON BERTULANG
KOMPONEN HARGA
No. ELEMEN STRUKTUR 1 m Beton
3
Besi Bekisting
L/m 3
Harga Satuan Kg Harga Satuan m 2
Harga Satuan
1 2 3 4 5 6 7 8
A SLOOF BETON BERTULANG
1 15 cm / 20 cm
- Tulangan Utama : 6 Ø 12
33.33 699,108.00 202.55 12,879.70 13.33 150,948.00
- Sengkang : 8 - 20
- Tulangan Utama : 6 Ø 10
33.33 699,108.00 175.37 12,879.70 13.33 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 12
33.33 699,108.00 170.44 12,879.70 13.33 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
33.33 699,108.00 229.63 12,879.70 13.33 150,948.00
- Sengkang : 10 - 15
2 20 cm / 30 cm
- Tulangan Utama : 8 Ø 12
16.67 699,108.00 149.20 12,879.70 10.00 150,948.00
- Sengkang : 10 - 20
- Tulangan Utama : 6 Ø 10
16.67 699,108.00 102.76 12,879.70 10.00 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 12
16.67 699,108.00 100.29 12,879.70 10.00 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
16.67 699,108.00 129.88 12,879.70 10.00 150,948.00
- Sengkang : 10 - 15
3 25 cm / 30 cm
- Tulangan Utama : 4 Ø 10
13.33 699,108.00 71.24 12,879.70 8.00 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 10
13.33 699,108.00 87.69 12,879.70 8.00 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 12
13.33 699,108.00 85.71 12,879.70 8.00 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
13.33 699,108.00 109.39 12,879.70 8.00 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 14
13.33 699,108.00 102.81 12,879.70 8.00 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 14
13.33 699,108.00 135.04 12,879.70 8.00 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 16
13.33 699,108.00 122.54 12,879.70 8.00 150,948.00
- Sengkang : 10 - 15
- Tulangan Utama : 12 Ø 14
8.16 699,108.00 151.93 12,879.70 11.43 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 10
8.16 699,108.00 63.75 12,879.70 11.43 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 10
8.16 699,108.00 73.82 12,879.70 11.43 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 12
8.16 699,108.00 62.54 12,879.70 11.43 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
8.16 699,108.00 77.04 12,879.70 11.43 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 12
8.16 699,108.00 91.53 12,879.70 11.43 246,014.00
- Sengkang : 10 - 15
2 30 cm / 30 cm
- Tulangan Utama : 12 Ø 14
11.11 699,108.00 197.66 12,879.70 13.33 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 10
11.11 699,108.00 77.64 12,879.70 13.33 246,014.00
11.11 699,108.00 77.64 12,879.70 13.33 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 10
11.11 699,108.00 91.34 12,879.70 13.33 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 12
11.11 699,108.00 75.99 12,879.70 13.33 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
11.11 699,108.00 95.72 12,879.70 13.33 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 12
11.11 699,108.00 115.45 12,879.70 13.33 246,014.00
- Sengkang : 10 - 15
2 25 cm / 25 cm
- Tulangan Utama : 10 Ø 12
16.00 699,108.00 186.77 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 10
16.00 699,108.00 98.65 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 10
16.00 699,108.00 118.38 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 12
16.00 699,108.00 96.28 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
16.00 699,108.00 124.69 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 12
16.00 699,108.00 153.10 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 14
16.00 699,108.00 116.80 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 14
16.00 699,108.00 155.47 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 14
16.00 699,108.00 194.14 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 16
16.00 699,108.00 140.47 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 18
16.00 699,108.00 231.23 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 18
16.00 699,108.00 295.15 12,879.70 16.00 246,014.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 12
33.33 699,108.00 288.81 12,879.70 18.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 10
33.33 699,108.00 175.37 12,879.70 18.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 12
33.33 699,108.00 170.44 12,879.70 18.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
33.33 699,108.00 229.63 12,879.70 18.33 253,114.00
- Sengkang : 10 - 15
2 20 cm / 30 cm
- Tulangan Utama : 10 Ø 12
16.67 699,108.00 189.07 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 10
16.67 699,108.00 102.76 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 12
16.67 699,108.00 100.29 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
16.67 699,108.00 129.88 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
3 20 cm / 25 cm
- Tulangan Utama : 8 Ø 12
20.00 699,108.00 183.15 12,879.70 14.00 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 10
20.00 699,108.00 115.09 12,879.70 14.00 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 12
20.00 699,108.00 112.13 12,879.70 14.00 253,114.00
20.00 699,108.00 112.13 12,879.70 14.00 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
20.00 699,108.00 147.64 12,879.70 14.00 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 14
20.00 699,108.00 137.78 12,879.70 14.00 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 14
20.00 699,108.00 186.11 12,879.70 14.00 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 16
20.00 699,108.00 167.37 12,879.70 14.00 253,114.00
- Sengkang : 10 - 15
3 20 cm / 30 cm
- Tulangan Utama : 8 Ø 12
16.67 699,108.00 159.48 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 12
16.67 699,108.00 129.88 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 14
16.67 699,108.00 121.66 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 14
16.67 699,108.00 161.94 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 4 Ø 16
16.67 699,108.00 146.32 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 6 Ø 16
16.67 699,108.00 198.94 12,879.70 13.33 253,114.00
- Sengkang : 10 - 15
- Tulangan Utama : 8 Ø 16
16.67 699,108.00 269.63 12,879.70 13.33 253,114.00
- Sengkang : 12 - 15
D PELAT
1 15 cm
2 30 cm