REKAPITULASI

DAFTAR KUANTITAS DAN HARGA (DKH)


PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK


Lokasi :
Satuan Kerja : Penyediaan Rumah Susun Kementerian PU dan Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2020

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART -

A.1. LANTAI 1 -
1. PEMIPAAN AIR BERSIH -
2. PEMIPAAN AIR KOTOR & AIR BEKAS -
3. PEMIPAAN AIR HUJAN -
4. PEMIPAAN VENT -
5. INSTALASI PANEL -
6. INSTALASI KABEL FEEDER -
7. INSTALASI KABEL TRAY -
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -
9. INSTALASI PENERANGAN & STOP KONTAK -

A.2. LANTAI 2 -
1. PEMIPAAN AIR BERSIH -
2. PEMIPAAN AIR KOTOR & AIR BEKAS -
3. PEMIPAAN AIR HUJAN -
4. PEMIPAAN VENT -
5. INSTALASI PANEL -
6. INSTALASI KABEL FEEDER -
7. INSTALASI KABEL TRAY -
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -
9. INSTALASI PENERANGAN & STOP KONTAK -

A.3. LANTAI 3 -
1. PEMIPAAN AIR BERSIH -
2. PEMIPAAN AIR KOTOR & AIR BEKAS -
3. PEMIPAAN AIR HUJAN -
4. PEMIPAAN VENT -
5. INSTALASI PANEL -
6. INSTALASI KABEL FEEDER -
7. INSTALASI KABEL TRAY -
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -
9. INSTALASI PENERANGAN & STOP KONTAK -

A.4. LANTAI ATAP -


1. PEMIPAAN AIR BERSIH -
2. PEMIPAAN AIR HUJAN -

A.5. PEKERJAAN UTILITAS -


1. INSTALASI PANEL -

Page 1 of 18
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA (DKH)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK


Lokasi :
Satuan Kerja : Penyediaan Rumah Susun Kementerian PU dan Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2020

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

2. INSTALASI KABEL FEEDER -


3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -
4. INSTALASI PENERANGAN & STOP KONTAK -

PEKERJAAN
A.6. SISTEM PENTANAHAN -
1. INSTALASI -

A.7. PEKERJAAN PENANGKAL PETIR -


1. INSTALASI -

B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART -

B.1. PEKERJAAN PEMADAM KEBAKARAN -


I INSTALASI APAR -
B.2 PEKERJAAN VENTILASI UDARA -
B.3. PEKERJAAN INSTALASI ELEKTRONIK -
I PEKERJAAN FIRE ALARM -
B.4. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN) -
I PEKERJAAN INSTALASI PLAMBING -
II PENYAMBUNGAN DAYA PLN -
III PEKERJAAN INSTALASI KABEL FEEDER -

SUB TOTAL : -

Page 2 of 18
DAFTAR KUANTITAS DAN HARGA (DKH)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK


Lokasi :
Satuan Kerja : Penyediaan Rumah Susun Kementerian PU dan Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2020

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

A. PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART -

A.1. LANTAI 1 -

1. PEMIPAAN AIR BERSIH -


Pipa PVC AW (Incl. Fitting & Accessories)
- PVC AW dia. 15 m 168,00 - -
- PVC AW dia. 20 m 56,00 - -
- PVC AW dia. 40 m 86,00 - -
- PVC AW dia. 50 (Riser dari Tangki Air Atas) m 20,00 - -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 1,00 - -
- dia. 20 bh 14,00 - -
- Meter Air c/w BV dia. 20 bh 14,00 - -

2. PEMIPAAN AIR KOTOR & AIR BEKAS -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 150 ( horisontal pipa air kotor ) m 84,00 - -
- dia. 150 ( horisontal pipa air bekas) m 72,00 - -
- dia. 100 ( riser pipa air kotor ) m 56,00 - -
- dia. 80 ( riser pipa air bekas ) m 56,00 - -
- dia. 100 m 28,00 - -
- dia. 80 m 56,00 - -
- dia. 50 m 28,00 - -
Clean Out (CO)
- CO, dia. 150 bh 4,00 - -
- CO, dia. 100 bh 4,00 - -

3. PEMIPAAN AIR HUJAN -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak ) m 44,00 - -
- dia. 80 ( pipa balkon ) m 39,00 - -

4. PEMIPAAN VENT -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 50 ( pipa riser ) m 56,00 - -
- Dia. 32 m 14,00 - -

Page 3 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

5. INSTALASI PANEL -
Pengadaan dan pemasangan PP-LT.1 unit 1,00 - -
dengan komponen panel, sbb :
- MCCB 3P, 75 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 15,00 - -
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6. INSTALASI KABEL FEEDER -


a. Kabel Distribusi Daya dari MDP :
- NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.1 m' 10,00 - -

b. Kabel Distribusi Daya dari PP-LT.1 ke :


- NYM 3 x 4 mm2 ke P-Unit/1 m' 34,15 - -
- NYM 3 x 4 mm2 ke P-Unit/2 m' 28,95 - -
- NYM 3 x 4 mm2 ke P-Unit/3 m' 18,95 - -
- NYM 3 x 4 mm2 ke P-Unit/4 m' 29,45 - -
- NYM 3 x 4 mm2 ke P-Unit/5 m' 35,95 - -
- NYM 3 x 4 mm2 ke P-Unit/6 m' 43,95 - -
- NYM 3 x 4 mm2 ke P-Unit/7 m' 34,35 - -
- NYM 3 x 4 mm2 ke P-Unit/8 m' 29,11 - -
- NYM 3 x 4 mm2 ke P-Unit/9 m' 19,25 - -
- NYM 3 x 4 mm2 ke P-Unit/10 m' 16,45 - -
- NYM 3 x 4 mm2 ke P-Unit/11 m' 16,45 - -
- NYM 3 x 4 mm2 ke P-Unit/12 m' 16,45 - -
- NYM 3 x 4 mm2 ke P-Serbaguna m' 16,45 - -
- NYM 3 x 4 mm2 ke P-Pengelola m' 16,45 - -
- NYM 3 x 4 mm2 ke P-Selasar m' 16,45 - -

7. INSTALASI KABEL TRAY -


- Kabel Tray W600 x H100 m' 12,00 - -
- Kabel Tray W200 x H100 m' 77,00 - -
Fitting-Fitting :
- Elbow W200 x H100 bh 2,00 - -
- Tee W200 x H100 bh 1,00 - -

Page 4 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1,00 - -

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -


- Lampu LED 7 Watt , (Hunian) bh 71,00 - -
- Lampu LED 7 Watt , (Selasar) bh 17,00 - -
- Lampu LED 7 Watt, c/w battery charger (Selasar) bh 7,00 - -
- Lampu baret isi TL Bulat-20 watt c/w battery charger bh 2,00 - -
- Exit Lamp-18 watt c/w battery charger bh 3,00 - -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 86,00 - -
- Saklar 1 gang bh 27,00 - -
- Saklar 2 gang bh 18,00 - -
- Saklar Hotel 1 gang bh 6,00 - -

9. INSTALASI PENERANGAN & STOP KONTAK -


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 100,00 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 86,00 - -

A.2. LANTAI 2 -

1. PEMIPAAN AIR BERSIH -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 15 m 180,00 - -
- PVC AW dia. 20 m 60,00 - -
- PVC AW dia. 40 m 86,00 - -
- PVC AW dia. 50 (Riser dari Tangki Air Atas) m 16,00 - -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 1,00 - -
- dia. 20 bh 15,00 - -
- Meter Air c/w BV dia. 20 bh 15,00 - -

2. PEMIPAAN AIR KOTOR & AIR BEKAS -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( riser pipa air kotor ) m 60,00 - -
- dia. 80 ( riser pipa air bekas ) m 60,00 - -
- dia. 100 m 15,00 - -
- dia. 80 m 37,50 - -
- dia. 50 m 22,50 - -

3. PEMIPAAN AIR HUJAN -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak ) m 32,00 - -
- dia. 80 ( pipa balkon ) m 15,00 - -
- dia. 80 ( pipa selasar ) m 12,00 - -

Roof Drain, Cast Iron


- dia. 80 bh 2,00 - -

Page 5 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

4. PEMIPAAN VENT -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 50 ( pipa riser ) m 60,00 - -
- Dia. 32 m 15,00 - -

5. INSTALASI PANEL -
Pengadaan dan pemasangan PP-LT.2 unit 1,00 - -
dengan komponen panel, sbb :
- MCCB 3P, 63 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 15,00 - -
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6. INSTALASI KABEL FEEDER -


a. Kabel Distribusi Daya dari MDP :
- NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.2 m' 16,00 - -

b. Kabel Distribusi Daya dari PP-LT.2 ke :


- NYM 3 x 4 mm2 ke P-Unit/1 m' 34,15 - -
- NYM 3 x 4 mm2 ke P-Unit/2 m' 28,95 - -
- NYM 3 x 4 mm2 ke P-Unit/3 m' 16,45 - -
- NYM 3 x 4 mm2 ke P-Unit/4 m' 18,95 - -
- NYM 3 x 4 mm2 ke P-Unit/5 m' 29,45 - -
- NYM 3 x 4 mm2 ke P-Unit/6 m' 35,95 - -
- NYM 3 x 4 mm2 ke P-Unit/7 m' 43,95 - -
- NYM 3 x 4 mm2 ke P-Unit/8 m' 34,35 - -
- NYM 3 x 4 mm2 ke P-Unit/9 m' 29,11 - -
- NYM 3 x 4 mm2 ke P-Unit/10 m' 19,25 - -
- NYM 3 x 4 mm2 ke P-Unit/11 m' 16,45 - -
- NYM 3 x 4 mm2 ke P-Unit/12 m' 28,95 - -
- NYM 3 x 4 mm2 ke P-Unit/13 m' 28,95 - -
- NYM 3 x 4 mm2 ke P-Unit/14 m' 28,95 - -
- NYM 3 x 4 mm2 ke P-Selasar m' 28,95 - -

7. INSTALASI KABEL TRAY -


- Kabel Tray W200 x H100 m' 77,00 - -

Page 6 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

Fitting-Fitting :
- Elbow W200 x H100 bh 2,00 - -
- Tee W200 x H100 bh 1,00 - -
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1,00 - -

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -


- Lampu LED 7 Watt , (Hunian) bh 67,00 - -
- Lampu LED 7 Watt , (Selasar) bh 17,00 - -
- Lampu LED 7 Watt, c/w battery charger (Selasar) bh 5,00 - -
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 2,00 - -
- Exit Lamp-18 watt c/w battery charger bh 2,00 - -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 91,00 - -
- Saklar 1 gang bh 30,00 - -
- Saklar 2 gang bh 16,00 - -
- Saklar Hotel bh 6,00 - -

9. INSTALASI PENERANGAN & STOP KONTAK -


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 93,00 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 91,00 - -

A.3. LANTAI 3 -

1. PEMIPAAN AIR BERSIH -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 15 m 180,00 - -
- PVC AW dia. 20 m 60,00 - -
- PVC AW dia. 40 m 86,00 - -
- PVC AW dia. 50 (Riser dari Tangki Air Atas) m 12,00 - -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 1,00 - -
- dia. 20 bh 15,00 - -
- Meter Air c/w BV dia. 20 bh 15,00 - -

2. PEMIPAAN AIR KOTOR & AIR BEKAS -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( riser pipa air kotor ) m 60,00 - -
- dia. 80 ( riser pipa air bekas ) m 60,00 - -
- dia. 100 m 15,00 - -
- dia. 80 m 37,50 - -
- dia. 50 m 22,50 - -

3. PEMIPAAN AIR HUJAN -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak ) m 32,00 - -
- dia. 80 ( pipa balkon ) m 15,00 - -

4. PEMIPAAN VENT -

Page 7 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

Pipa PVC Kelas D (Incl. Fitting & Accessories)


- Dia. 50 ( pipa riser ) m 60,00 - -
- Dia. 32 m 15,00 - -

- Vent cup Dia. 50 bh 15,00 - -

5. INSTALASI PANEL -
Pengadaan dan pemasangan PP-LT.2 unit 1,00 - -
dengan komponen panel, sbb :
- MCCB 3P, 63 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 15,00 - -
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6. INSTALASI KABEL FEEDER -


a. Kabel Distribusi Daya dari MDP :
- NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.3 m' 22,00 - -

b. Kabel Distribusi Daya dari PP-LT.3 ke :


- NYM 3 x 4 mm2 ke P-Unit/1 m' 34,15 - -
- NYM 3 x 4 mm2 ke P-Unit/2 m' 28,95 - -
- NYM 3 x 4 mm2 ke P-Unit/3 m' 16,45 - -
- NYM 3 x 4 mm2 ke P-Unit/4 m' 18,95 - -
- NYM 3 x 4 mm2 ke P-Unit/5 m' 29,45 - -
- NYM 3 x 4 mm2 ke P-Unit/6 m' 35,95 - -
- NYM 3 x 4 mm2 ke P-Unit/7 m' 43,95 - -
- NYM 3 x 4 mm2 ke P-Unit/8 m' 34,35 - -
- NYM 3 x 4 mm2 ke P-Unit/9 m' 29,11 - -
- NYM 3 x 4 mm2 ke P-Unit/10 m' 19,25 - -
- NYM 3 x 4 mm2 ke P-Unit/11 m' 16,45 - -
- NYM 3 x 4 mm2 ke P-Unit/12 m' 28,95 - -
- NYM 3 x 4 mm2 ke P-Unit/13 m' 28,95 - -
- NYM 3 x 4 mm2 ke P-Unit/14 m' 28,95 - -
- NYM 3 x 4 mm2 ke P-Selasar m' 28,95 - -

7. INSTALASI KABEL TRAY -

Page 8 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

- Kabel Tray W200 x H100 m' 77,00 - -


Fitting-Fitting :
- Elbow W200 x H100 bh 2,00 - -
- Tee W200 x H100 bh 1,00 - -
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1,00 - -

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -


- Lampu LED 7 Watt , (Hunian) bh 67,00 - -
- Lampu TL 1 x 18 Watt , Balk Type (Selasar) bh 17,00 - -
- Lampu TL 1 x 18 W, TL Balk Type c/w battery charger (Selasar) bh 5,00 - -
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 2,00 - -
- Exit Lamp-18 watt c/w battery charger bh 2,00 - -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 91,00 - -
- Saklar 1 gang bh 30,00 - -
- Saklar 2 gang bh 16,00 - -
- Saklar Hotel 1 gang bh 6,00 - -

9. INSTALASI PENERANGAN & STOP KONTAK -


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 93,00 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 91,00 - -

A.4. LANTAI ATAP -

1. PEMIPAAN AIR BERSIH -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 65 (Riser ke tanki air atas) m 28,00 - -
- PVC AW dia. 32 (Pipa Drain) m 6,00 - -
- PVC AW dia. 100 (Header) m 4,00 - -

Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 65 bh 2,00 - -
- dia. 50 bh 7,00 - -
- dia. 32 bh 2,00 - -

2. PEMIPAAN AIR HUJAN -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
Roof Drain, Cast Iron
- dia. 100 bh 12,00 - -

A.5. PEKERJAAN UTILITAS -

1. INSTALASI PANEL -

a. P-PLN unit by pln by pln


- MCCB 3P, 200 A : 1 bh
- Accessories & Termination : 1 lot
- Box Panel : 1 unit

Page 9 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

b. P-MDP
Pengadaan dan pemasangan MDP , dengan komponen panel, unit 1,00 - -
sbb :
- Mgs 3P, 63 A
- MCCB 3P, 200 A
- MCCB 3P, 80 A
- MCCB 3P, 32 A
- MCB 3P, 32 A
- Contacto, (timer switch)
- Earth Fault Relay
- Over Current Relay
- Over / Under Voltage Relay
- Power Factor-meter
- Frequency-metr
- Ampere-meter 300/5 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- CT 300/5 A
- CT 50/5 A
- Fuse Carrier 4 A
- Indicator Lamp
- Rel MCCB 3P
- CU Bar 5 x 400 A
- Accessories & Termination
- Box Panel

c. P-PENGELOLA
Pengadaan dan pemasangan P-PENGELOLA unit 1,00 - -
dengan komponen panel, sbb :
- MCCB 3P, 80 A
- MCB 3P, 63 A
- MCB 3P, 32 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 80 A
- Accessories & Termination
- Box Panel

- KW-meter/3ph/80A bh 1,00 - -

d. P-POMPA AIR BERSIH

Page 10 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

Pengadaan dan pemasangan P-POMPA AIR BERSIH , dengan kompo- unit 1,00 - -
nen panel, sbb :
- MCB 3P, 32 A
- MCB 3P, 10 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Radar diantaki air atas
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A
- Accessories & Termination
- Box Panel

2. INSTALASI KABEL FEEDER -


- NYY 4 x 70 mm2 + E-NYA 35 mm2 Dari P-PLN ke MDP m' 50,00 - -

Kabel Distribusi Daya dari MDP :


- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-PENGELOLA-LT.1 m' 10,00 - -

Kabel Distribusi Daya dari P-PENGELOLA :


- NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih m' 40,00 - -
- NYY 4 x 4 mm2 + E-NYA 4 mm2 ke P-Shallow Well Pump m' 40,00 - -

3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -


a. Ruang Pompa
- TL 1 x 18 W, TL Balk Type bh 2,00 - -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 1,00 - -
- Saklar 1 gang bh 2,00 - -

b. Lampu Taman
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt bh 16,00 - -

4. INSTALASI PENERANGAN & STOP KONTAK -


a. Ruang Pompa
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 2,00 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 1,00 - -

b. Lampu Taman
- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk 16,00 - -

- Testing & Commissioning lot 1,00 - -

A.6. PEKERJAAN SISTEM PENTANAHAN -

1. INSTALASI -
Pentanahan (Grounding) Netral Sistem & Pentanahan Body

Page 11 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

a. - Body Panel -
Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1,00 - -
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1,00 - -
- Kabel BC 50 mm2 m 30,00 - -
- Testing & Commissioning lot 1,00 - -

b. - Body Peralatan pada Sistem Elektronik -


Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1,00 - -
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1,00 - -
- Kabel BC 50 mm2 m 30,00 - -
- Testing & Commissioning lot 1,00 - -

A.7. PEKERJAAN PENANGKAL PETIR -

1. INSTALASI -
- Splitzen T=1 meter, pipa galvanized c/w : peralatan bantu unit 5,00 - -
- Bak kontrol 40x40x30 cm unit 2,00 - -
- Down Conduktor BC 50mm + accessories m' 102,00 - -
- Grounding System max. 2 ohm lot 2,00 - -
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Biaya Instalasi lot 1,00 - -
- Material Bantu lot 1,00 - -
- Testing & Comissioning included perijinan dari DEPNAKER lot 1,00 - -
- Bracket, Seal , Test Box , dls lot 1,00 - -

Page 12 of 18
DAFTAR KUANTITAS DAN HARGA (DKH)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK


Lokasi :
Satuan Kerja : Penyediaan Rumah Susun Kementerian PU dan Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2020

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

B. PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART -

B.1. PEKERJAAN PEMADAM KEBAKARAN -

I INSTALASI APAR -

a LANTAI 1
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 5,00 - -
- Type Class BC 4,6 kg CO2 Seamless, c/w support bh 1,00 - -

b LANTAI 2
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 5,00 - -

c LANTAI 3
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 5,00 - -

B.2 PEKERJAAN VENTILASI UDARA -


A Exhaust Fan Toilet
1 LANTAI 1
- Exhaust kap 100 Cfm ( ceiling Mounted ) unit 12 - -

Pipa PVC Class D

- dia. 100 m 48 - -
- Grille 200 x 200 (Alumunium) bh 12 - -

2 LANTAI 2 & 3
- Exhaust kap 200 CMH ( ceiling Mounted ) unit 28 - -

Pipa PVC Class D

- dia. 100 m 112 - -


- Grille 200 x 200 (Alumunium) bh 28 - -

Page 13 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

B.3. PEKERJAAN INSTALASI ELEKTRONIK -

I PEKERJAAN FIRE ALARM -


a PERALATAN UTAMA FIRE ALARM SYSTEM

Pengadaan dan pemasangan peralatan Sistem Fire Alarm


ditempatkan di Ruang Kontrol secara lengkap termasuk peng-
kabelan dan koneksi meliputi peralatan sesuai diuraikan dlm
Gambar dan Spesifikasi Teknis, tetapi tidak terbats pada item
sebagai berikut :

MCFA, kapasitas 10 Zone unit 1,00 - -


MDF, kapasitas 10 Zone set 1,00 - -
Rectifier bh 1,00 - -
Power Surge Arrester bh 1,00 - -
Battery & Charger 4 jam bh 1,00 - -
Grounding u/ MCFA dan Surge Arrester ( R < 0,5 Ohm ) lot 1,00 - -

b INSTALASI KABEL FEEDER FIRE ALARM

INSTALASI FEEDER MELALUI RISER / SHAFT

Kabel NYA 5 x 2 x 2,5 mm2 in conduit Dia.32 dari MCFA ke MDF mtr 28,00 - -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.1 mtr 2,00 - -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.2 mtr 6,00 - -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.3 mtr 12,00 - -

c PERALATAN PENGINDERA dan PENANDA KEBAKARAN

Pengadaan dan pemasangan peralatan pengindera dan penan-


da kebakaran berikut alat / material bantu lainnya sesuai Gam-
bar dan Spesifikasi Teknis.

Lantai-1
- Rate Of Rise Temperature - Heat detector bh 15,00 - -
- Manual push button bh 1,00 - -
- Lampu Indikator bh 1,00 - -
- Bell alarm bh 1,00 - -
- End of Line Resistor bh 2,00 - -
- TB-FA-LT.1 bh 1,00 - -

Lantai-2

Page 14 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

- Rate Of Rise Temperature - Heat detector bh 15,00 - -


- Manual push button bh 1,00 - -
- Lampu Indikator bh 1,00 - -
- Bell alarm bh 1,00 - -
- End of Line Resistor bh 2,00 - -
- TB-FA-LT.2 bh 1,00 - -

Lantai-3
- Rate Of Rise Temperature - Heat detector bh 15,00 - -
- Manual push button bh 1,00 - -
- Lampu Indikator bh 1,00 - -
- Bell alarm bh 1,00 - -
- End of Line Resistor bh 2,00 - -
- TB-FA-LT.3 bh 1,00 - -

d PERALATAN PENGINDERA dan PENANDA KEBAKARAN

Instalasi titik detector dari TB-FA dengan kabel NYA 2 x 1,5 mm2
didalam conduit dia. 20 mm2 lengkap dengan aksesoris dan
semua peralatan / material bantu pemasangan sesuai detail
Gambar dan Spesifikasi Teknis.

Lantai-1
- Rate Of Rise Temperature - Heat detector ttk 15,00 - -
- Manual push button ttk 1,00 - -
- Lampu Indikator ttk 1,00 - -
- Bell alarm ttk 1,00 - -

Lantai-2
- Rate Of Rise Temperature - Heat detector ttk 15,00 - -
- Manual push button ttk 1,00 - -
- Lampu Indikator ttk 1,00 - -
- Bell alarm ttk 1,00 - -

Lantai-3
- Rate Of Rise Temperature - Heat detector ttk 15,00 - -
- Manual push button ttk 1,00 - -
- Lampu Indikator ttk 1,00 - -
- Bell alarm ttk 1,00 - -

Testing & Comissioning included perijinan dari DEPNAKER lot 1,00 - -

Page 15 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

B.4. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN) -

I PEKERJAAN INSTALASI PLAMBING -

I.1 INSTALASI AIR BERSIH -


PERALATAN UTAMA
Pengadaan dan pemasangan unit
1 Lift Pump bh 2,00 - -
Kapasitas : 200 l/menit
Head : 36 mtr
Speed : 2900 rpm
PI : 5,5 KW/380V/50Hz/3ph
1 duty, 1 standby ( bergantian), lengkap dengan set 1,00 - -
panel control, wlc di Tanki Air Atas dan accessories

2 Booster Pump set 1,00 - -


Type : Packaged Booster Pump
Kapasitas : 2 x 120 l/menit
Head : 20 mtr
Speed : 1450 rpm
Daya : 2,2 KW/380V/50Hz/3ph
Operasi : 2 Parallel Alternate
( lengkap dengan Pump & Electromotor, Pressure Tank, Panel Kontrol, Pressure switch,
Presure Gauge, Accessories, Gate Valve, Header & base Plat )

3 Tangki Air Atas ( Type Cylinder ) unit 2,00 - -


Kapasitas : 2,5 m3
Glass Rainforcement Plastic (GRP), lengkap dengan Assesories dan dudukan/ pondasi

4 PEKERJAAN SHALLOW WELL unit 1,00 - -


a Pembuatan / Pengeboran sumur shallow well
- Kedalaman + 50 Meter
Pipa Casing , Pipa GIP Medium dia 150mm
Pipa Rising dia 80mm
Pipa screen dia 80mm
b Pengadaan dan pemasangan pompa shallow well
- Kapasitas(deb air)150 s/d 200 Lpm, pengadaan dan pemasangan pipa konstruksi : 1 unit
c Instalasi kabel Kontrol WLC : 1 unit
d Instalasi Pipa GIP dia 50 mm ke GWT : 1 unit
e Gate Valve dia 2" : 1 unit
f Bak Kontrol Valve uk, 600 x 600 mm dengan tutup bordes tebal 2 mm : 1 unit
g Panel kontrol shallow well type outdoor : 1 unit
h Pengujian kwalitas air ke laboratorium : 1 unit
i Testing Comissioning & Training : 1 unit

Page 16 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

j Material & Alat Bantu : 1 unit

5 Ground Water Tank unit by sipil by sipil


Kapasitas : 23 m3
Rainforced Concrete Made
6 ACCESSORIES POMPA AIR BERSIH
- Gate Valve
dia. 80 ( Untuk Penghubung/penyeimbang GWT) bh 2,00 - -
dia. 50 bh 4,00 - -
- Check Valve ( CV )
dia. 50 bh 2,00 - -
- Strainer ( STR )
dia. 50 bh 2,00 - -
- Flexible Joint ( FJ )
dia. 50 bh 4,00 - -
- Foot Valve
dia. 50 bh 2,00 - -
- Pressure Gauge bh 2,00 - -
- GIP med dia. 100 ( pipa header ) set 1,00 - -
- Instalasi pemipaan area pompa lot 1,00 - -
c/w fiting-fitting & support.
- Meteran Air c/w GV dia. 50 & Box Meteran unit 1,00 - -

7 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
a SITE PLAN
1. Dari Box Meter PDAM ke GWT
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) m 10,00 - -
2. Pemipaan R.Pompa ke Tanki Air Atas
- GIP dia. 50 m 46,00 - -

b Penyambungan pipa PDAM, pipa gip dia. 65 termasuk lot tidak ditawarkan -
Perijinan.

1,2 INSTALASI AIR KOTOR & AIR BEKAS -


1 Septic Tank ( Konvensional ) unit 2,00 - -
Kapasitas : 9 m3 /hari

2 Resapan unit 2,00 - -


Kapasitas : 5 m3

- Struktur Pondasi By Sipil

Page 17 of 18
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

3 Portable Grease Trap unit 44,00 - -


Kapasitas : 30 Ltr

4 TESTING COMMISSIONING lot 1,00 - -

II PENYAMBUNGAN DAYA PLN -

1 Pekerjaan Pasang Baru Daya Listrik PLN 66 KVA va 66.000 - -


- BP ( Biaya penyambungan )
- UJL ( Uang Jaminan Langanan )
- Biaya Instalatir
- Concuil
- Pemasangan dan material yang dibutuhkan, seperti ;
( kabel, tiang, pondasi, galian & urugan kembali, dll )

IV PEKERJAAN INSTALASI KABEL FEEDER -


Kabel Distribusi Daya dari Panel Pompa - Air Bersih
- NYY 4 x 4 mm2 ke LP-1 m' 10,00 - -
- NYY 4 x 4 mm2 ke LP-2 m' 10,00 - -

- Proteksi Kabel dengan Pipa Gip Dia 100 m' 20,00 - -


Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya

- Testing & Commissioning lot 1,00 - -

Page 18 of 18