Page 1 of 26
REKAPITULASI
BOQ (Bill of Quantity)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
4. PEMIPAAN VENT
5. INSTALASI PANEL
6. INSTALASI KABEL FEEDER
7. INSTALASI KABEL TRAY
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9. INSTALASI PENERANGAN & STOP KONTAK
PEKERJAAN
A.7. SISTEM PENTANAHAN
1. INSTALASI
Page 2 of 26
REKAPITULASI
BOQ (Bill of Quantity)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
Sub Total
Page 3 of 26
BOQ (Bill Of Quantity)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
M1 83.52
5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.1 unit 1.00
dengan komponen panel, sbb :
- MCB 3P, 16 A
- MCB 1P, 6 A
Page 4 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 12.00
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 14.00
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh
Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
Elbow W500 x H100 bh 1.00
Tee W500 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) 2% lot 1.00
Page 5 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80
M1 250.05
- Dia. 50
M 1
16.00
- Dia. 32
M1 115.20
5. INSTALASI PANEL
Page 6 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 16.00
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 16.00
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh
Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) 2% lot 1.00
Page 7 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
M1 126.94
5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.3 unit 1.00
dengan komponen panel, sbb :
Page 8 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
- MCCB 3P, 16 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 16.00
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 16.00
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh
Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) 2% lot 1.00
Page 9 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
M1 126.94
5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.3 unit 1.00
dengan komponen panel, sbb :
Page 10 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
- MCCB 3P, 16 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 16.00
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 16.00
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh
Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) 2% lot 1.00
Page 11 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 50 bh 12.00
1. INSTALASI PANEL
a. P-PLN unit
- MCCB 3P, 200 A : 1 bh
- Accessories & Termination : 1 lot
- Box Panel : 1 unit
b. P-MDP
Pengadaan dan pemasangan MDP, dengan komponen panel, unit 1.00
sbb :
- Mgs 3P, 200 A
- MCCB 3P, 200 A
- MCCB 3P, 80 A
- MCCB 3P, 32 A
Page 12 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
- MCB 3P, 32 A
- Contacto, (timer switch)
- Earth Fault Relay
- Over Current Relay
- Over / Under Voltage Relay
- Power Factor-meter
- Frequency-metr
- Ampere-meter 300/5 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- CT 300/5 A
- CT 50/5 A
- Fuse Carrier 4 A
- Indicator Lamp
- Rel MCCB 3P
- CU Bar 5 x 400 A
- Accessories & Termination
- Box Panel
c. P-PENGELOLA
Pengadaan dan pemasangan P-PENGELOLA unit 1.00
dengan komponen panel, sbb :
- MCCB 3P, 80 A
- MCB 3P, 63 A
- MCB 3P, 32 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 80 A
- Accessories & Termination
- Box Panel
- KW-meter/3ph/80A bh 1.00
Page 13 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
e. P-POMPA HYDRANT
Pengadaan dan pemasangan P-POMPA HYDRANT, dengan kompo- unit 1.00
nen panel, sbb :
- MCB 3P, 40 A
- MCB 3P, 16 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A
- Accessories & Termination
- Box Panel
b. Lampu Taman
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt bh 12.00
- Memasang Lampu PJU Tiang Octagonal Single Hotdip Galvanis,(t = 7 m) ttk 4.00
b. Lampu Taman
- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk 12.00
- Kabel Power Ins. PJU, NYFGBY 3 x 2,5 mm2 dari P.PJU ttk 4.00
Page 14 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
1. INSTALASI
Pentanahan (Grounding) Netral Sistem & Pentanahan Body
a. - Body Panel
Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1.00
- Kabel BC 50 mm2
M1 30.00
- Testing & Commissioning lot 1.00
2. DOWN CONDUCTOR
a. 25 x 3mm Bare Alumunium Tape
M1 3.00
b. Grey 25 x 3mm Non-Metallic DC tape clip bh 3.00
c. 25 x 3mm Alumunium Square tape clamp bh 15.00
d. Test Connection Link bh 3.00
3. GROUNDING SYSTEM
a. Polymer Inspection Pit bh 3.00
b. 5/8" x 1800 mm Extensible Copperbond Rod bh 3.00
c. 5/8" Rod Coupling bh 3.00
d. Exothermic weilding bh 6.00
e. Stranded Bar copper conductor 70 mm M1 188.00
4. MATERIAL SUPPORT
a. Mould for looping unit 1.00
b. Powder unit 6.00
c. Handle Clamp unit 1.00
d. flint gun unit 1.00
Page 15 of 26
BOQ (Billl Of Quantity)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
I INSTALASI APAR
a LANTAI 1
- Pipa BS Sch.40
dia. 4" (Riser) m 5.00
dia. 3" m 35.80
- Fitting & Accessories lot 1.00
- Hydrant Box Indoor (Size 100x80x18) bh 1.00
- Gate Valve
dia. 3" bh 1.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 6.00
b LANTAI 2
- Pipa BS Sch.40
dia. 4" (Riser) m 4.00
dia. 3" m 35.60
- Fitting & Accessories lot 1.00
- Hydrant Box Indoor (Size 100x80x18) bh 1.00
- Gate Valve
dia. 3" bh 1.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 6.00
c LANTAI 3
- Pipa BS Sch.40
dia. 4" (Riser) m 4.00
dia. 3" m 35.96
- Fitting & Accessories lot 1.00
- Hydrant Box Indoor (Size 100x80x18) bh 1.00
- Gate Valve
dia. 3" bh 1.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 6.00
d LANTAI 4
- Pipa BS Sch.40
dia. 4" (Riser) m 4.00
Page 16 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
e SITE PLAN
- Pipa BS Sch.40
dia. 4" m 213.00
- Fitting & Accessories lot 1.00
- Hydrant Box Outdoor bh 4.00
- Hydrant Pillar bh 4.00
- Seamesse connection bh 4.00
- Gate Valve
dia. 4" bh 5.00
- Check Valve
dia. 4" bh 1.00
I PEKERJAAN SYSTEM TV
b SPLITTER TV
Page 17 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
LANTAI 1
Splitter 7 ports bh 3.00
TB-Splitter-TV/LT.1 bh 1.00
Lantai 2
Splitter 7 ports bh 4.00
TB-Splitter-TV/LT.2 bh 1.00
Lantai 3
Splitter 7 ports bh 4.00
TB-Splitter-TV/LT.3 bh 1.00
Lantai 4
Splitter 7 ports bh 4.00
TB-Splitter-TV/LT.3 bh 1.00
Lantai 1
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Splitter-Lt.1 m 10.00
Lantai 2
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Splitter-Lt.2 m 15.00
Lantai 3
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-Lt.3 m 20.00
Lantai 4
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-Lt.3 m 25.00
d TV OUTLET
Lantai 1
TV Outlet bh 13.00
Lantai 2
TV Outlet bh 16.00
Page 18 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Lantai 3
TV Outlet bh 16.00
Lantai 4
TV Outlet bh 16.00
e INSTALASI OUTLET TV
Lantai 1
TV Outlet ttk 13.00
Lantai 2
TV Outlet ttk 16.00
Lantai 3
TV Outlet ttk 16.00
Lantai 4
TV Outlet ttk 16.00
Kabel NYA 5 x 2 x 2,5 mm2 in conduit Dia.32 dari MCFA ke MDF m 28.00
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.1 m 2.00
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.2 m 6.00
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.3 m 12.00
Page 19 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Lantai-1
- Smoke Detector bh 56.00
- Rate Of Rise Temperature - Heat detector bh 4.00
Fixed Heat Detector bh 10.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-LT.1 bh 1.00
Lantai-2
- Smoke Detector bh 53.00
- Rate Of Rise Temperature - Heat detector bh 4.00
Fixed Heat Detector bh 16.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-LT.2 bh 1.00
Lantai-3
- Smoke Detector bh 53.00
- Rate Of Rise Temperature - Heat detector bh 4.00
Fixed Heat Detector bh 16.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-LT.3 bh 1.00
Lantai-4
- Smoke Detector bh 53.00
- Rate Of Rise Temperature - Heat detector bh 4.00
Fixed Heat Detector bh 16.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-LT.3 bh 1.00
Instalasi titik detector dari TB-FA dengan kabel NYA 2 x 1,5 mm2
didalam conduit dia. 20 mm2 lengkap dengan aksesoris dan
semua peralatan / material bantu pemasangan sesuai detail
Page 20 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Lantai-1
- Detector Fire Alarm ttk 70.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00
Lantai-2
- Detector Fire Alarm ttk 73.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00
Lantai-3
- Detector Fire Alarm ttk 73.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00
Lantai-4
- Detector Fire Alarm ttk 73.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00
b INSTALASI CCTV
Lantai 1
- Dome Camera Colour Fixed w/ Varifocal Lens bh 4.00
- Instalasi Camera Fixed Dome Indoor ttk 4.00
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)
Lantai 2
- Dome Camera Colour Fixed w/ Varifocal Lens bh 4.00
- Instalasi Camera Fixed Dome Indoor ttk 4.00
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)
Page 21 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Lantai 3
- Dome Camera Colour Fixed w/ Varifocal Lens bh 4.00
- Instalasi Camera Fixed Dome Indoor ttk 4.00
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)
Lantai 4
- Dome Camera Colour Fixed w/ Varifocal Lens bh 4.00
- Instalasi Camera Fixed Dome Indoor ttk 4.00
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)
Lantai 2
- Ceiling speaker 3 W bh 7.00
- TBTS-LT.2 bh 1.00
- Instalasi sound system (NYMHY 2 x 1,5 mm2) ttk 7.00
Lantai 3
- Ceiling speaker 3 W bh 7.00
- TBTS-LT.2 bh 1.00
- Instalasi sound system (NYMHY 2 x 1,5 mm2) ttk 7.00
Lantai 4
- Ceiling speaker 3 W bh 7.00
- TBTS-LT.2 bh 1.00
- Instalasi sound system (NYMHY 2 x 1,5 mm2) ttk 7.00
Page 22 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Filter Pump
Type : Centrifugal End Suction set 1.00
Kapasitas : 200 LPM ; 30 M
Power : 2.2 kw
Page 23 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Butterfly Valve
dia. 100 bh 3.00
- Check Valve ( CV )
dia. 50 bh 4.00
- Strainer ( STR )
dia. 50 bh 4.00
- Flexible Joint ( FJ )
dia. 50 bh 8.00
- Foot Valve
dia. 50 bh 2.00
dia. 80 bh 2.00
- Pressure Gauge bh 4.00
- GIP med dia. 100 ( pipa header ) set 2.00
GIP med dia. 125 ( Pipa inlet Pompa Hydrant ) m 5.00
GIP med dia. 125 ( Pipa Penyeimbang GWT) m 4.00
- Instalasi pemipaan area pompa 10% lot 1.00
c/w fiting-fitting & support.
- Meteran Air c/w GV dia. 50 & Box Meteran unit 1.00
8 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
a SITE PLAN
1. Dari Box Meter PDAM ke GWT
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) m 10.00
2. Pemipaan R.Pompa ke Tanki Air Atas
- GIP dia. 50 m 46.38
Page 24 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
1 Pekerjaan Pasang Baru Daya Listrik PLN 131 KVA (131.000 VA) Lot 1
- BP ( Biaya penyambungan )
- UJL ( Uang Jaminan Langanan )
- Biaya Instalatir
- Concuil
- Pemasangan dan material yang dibutuhkan, seperti ;
( kabel, tiang, pondasi, galian & urugan kembali, dll )
Page 25 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya
Page 26 of 26