Anda di halaman 1dari 26

REKAPITULASI

BOQ (Bill of Quantity)


PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN PEMERINTAH KOTA MADIUN


TIPE PROTOTYPE : TIPE 36
JUMLAH LANTAI : 4 LANTAI
TAHUN ANGGARAN : 2022 - 2023

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

IV.A. PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART

A.1. PEKERJAAN LANTAI 1


1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR KOTOR & AIR BEKAS
3. PEMIPAAN AIR HUJAN
4. PEMIPAAN VENT
5. INSTALASI PANEL
6. INSTALASI KABEL FEEDER
7. INSTALASI KABEL TRAY
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9. INSTALASI PENERANGAN & STOP KONTAK

A.2. PEKERJAAN LANTAI 2


1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR KOTOR & AIR BEKAS
3. PEMIPAAN AIR HUJAN
4. PEMIPAAN VENT
5. INSTALASI PANEL
6. INSTALASI KABEL FEEDER
7. INSTALASI KABEL TRAY
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9. INSTALASI PENERANGAN & STOP KONTAK

A.3. PEKERJAAN LANTAI 3


1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR KOTOR & AIR BEKAS
3. PEMIPAAN AIR HUJAN
4. PEMIPAAN VENT
5. INSTALASI PANEL
6. INSTALASI KABEL FEEDER
7. INSTALASI KABEL TRAY
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9. INSTALASI PENERANGAN & STOP KONTAK

A.4. PEKERJAAN LANTAI 4


1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR KOTOR & AIR BEKAS
3. PEMIPAAN AIR HUJAN

Page 1 of 26
REKAPITULASI
BOQ (Bill of Quantity)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN PEMERINTAH KOTA MADIUN


TIPE PROTOTYPE : TIPE 36
JUMLAH LANTAI : 4 LANTAI
TAHUN ANGGARAN : 2022 - 2023

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

4. PEMIPAAN VENT
5. INSTALASI PANEL
6. INSTALASI KABEL FEEDER
7. INSTALASI KABEL TRAY
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9. INSTALASI PENERANGAN & STOP KONTAK

A.5. PEKERJAAN LANTAI ATAP


1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR HUJAN

A.6. PEKERJAAN UTILITAS


1. INSTALASI PANEL
2. INSTALASI KABEL FEEDER
3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
4. INSTALASI PENERANGAN & STOP KONTAK

PEKERJAAN
A.7. SISTEM PENTANAHAN
1. INSTALASI

A.8. PEKERJAAN PENANGKAL PETIR (FARADAY)

IV.B. PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART

B.1. PEKERJAAN PEMADAM KEBAKARAN


I INSTALASI APAR
B.2. PEKERJAAN VENTILASI UDARA
B.3. PEKERJAAN INSTALASI ELEKTRONIK
I PEKERJAAN SYSTEM TV
II PEKERJAAN FIRE ALARM
III PEKERJAAN CCTV
IV PEKERJAAN TATA SUARA

Page 2 of 26
REKAPITULASI
BOQ (Bill of Quantity)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN PEMERINTAH KOTA MADIUN


TIPE PROTOTYPE : TIPE 36
JUMLAH LANTAI : 4 LANTAI
TAHUN ANGGARAN : 2022 - 2023

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

B.4. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)


I PEKERJAAN INSTALASI PLUMBING
II PEKERJAAN INSTALASI PEMADAM KEBAKARAN
III PENYAMBUNGAN DAYA PLN
IV PEKERJAAN INSTALASI KABEL FEEDER

Sub Total

Page 3 of 26
BOQ (Bill Of Quantity)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN MBR PEMERINTAH KOTA MADIUN


TIPE PROTOTYPE : TIPE 36
JUMLAH LANTAI : 4 LANTAI
TAHUN ANGGARAN : 2022 - 2023

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

IV.A. PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART

A.1. PEKERJAAN LANTAI 1

1. PEMIPAAN AIR BERSIH


Pipa PPR PN10 (Incl. Fitting & Accessories)
- PPR PN10 dia. 15 M1 173.36
- PPR PN10 dia. 20 M1 153.35
- PPR PN10 dia. 40 (1,5") M 1
119.03
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas) M 1
10.40
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 20 bh 2.00
- dia. 40 bh 12.00
Meter Air c/w BV dia. 20 bh 12.00

2. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 150 ( Pipa Air Bekas)
M1 213.62
- dia. 150 ( Pipa Air Kotor )
M1 201.32
- dia. 100 ( Pipa Air Bekas )
M1 175.25
Clean Out (CO)
- CO, dia. 150 bh 6.00
- CO, dia. 100 bh 8.00
- Portable Grease Trap bh 12.00
- Roof drain 2" bh 2.00

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 150 (Air Hujan)
M1 99.17
- dia. 100 (Air Hujan)
M 1
48.92
- dia. 80
M 1
68.84
- dia. 50
M1 26.64

4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
M1 83.52

5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.1 unit 1.00
dengan komponen panel, sbb :
- MCB 3P, 16 A

- MCB 1P, 6 A
Page 4 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel

- KW-meter/1ph/6A bh 12.00

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 14.00
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari MDP :
- NYY 4 x 4 mm2 + E-NYA 4 mm2 ke PP-LT.1 M1 0.88

b. Kabel Distribusi Daya dari KWH Unit ke :


NYM 3 x 4 mm2 ke P-Unit/1 M1 24.60
NYM 3 x 4 mm2 ke P-Unit/2 M1 36.72
NYM 3 x 4 mm2 ke P-Unit/3 M1 42.82
NYM 3 x 4 mm2 ke P-Unit/4 M 1
53.70
NYM 3 x 4 mm2 ke P-Unit/5 M 1
55.70
NYM 3 x 4 mm2 ke P-Unit/6 M1 68.80
NYM 3 x 4 mm2 ke P-Unit/7 M1 16.20
NYM 3 x 4 mm2 ke P-Unit/8 M 1
23.60
NYM 3 x 4 mm2 ke P-Unit/9 M 1
33.60
NYM 3 x 4 mm2 ke P-Unit/10 M1 39.46
NYM 3 x 4 mm2 ke P-Unit/11 M1 62.80
NYM 3 x 4 mm2 ke P-Unit/12 M1 69.40

7. INSTALASI KABEL TRAY


- Kabel Tray W200 x H100
M1 56.11
- Kabel Tray W500 x H100 M 1
11.45
- Kabel Leadder W500 x H100 (Riser) M1 4.00

Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
Elbow W500 x H100 bh 1.00
Tee W500 x H100 bh 1.00

- Material bantu ( mur, baut, hanger rod, supporting, dll ) 2% lot 1.00

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


- Lampu LED 9 Watt bh 98.00
- Lampu LED 9 Watt, c/w battery charger (Selasar) bh 5.00
- Lampu LED 7 Watt bh 45.00
- Lampu baret isi TL Bulat-20 watt c/w battery charger bh 1.00

Page 5 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

- Exit Lamp-18 watt c/w battery charger bh 3.00


- Lampu TL 1 x 36 watt, Balk bh 3.00
- Stop Kontak 1P, 220 Volt, 10A, Wall Type bh 81.00
- Saklar 1 Gang bh 17.00
- Saklar 2 Gang bh 56.00
- Saklar Hotel 1 Gang bh 1.00
- Saklar Hotel 2 Gang bh 4.00

9. INSTALASI PENERANGAN & STOP KONTAK


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 155.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 81.00

A.2. PEKERJAAN LANTAI 2

1. PEMIPAAN AIR BERSIH


Pipa PPR PN10 (Incl. Fitting & Accessories)
- PPR PN10 dia. 15 M1 189.80
- PPR PN10 dia. 20 M 1
176.69
- PPR PN10 dia. 40 M1 123.94
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas) M1 6.80
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 1.00
- dia. 20 bh 16.00
- Meter Air c/w BV dia. 20 bh 16.00

2. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 150 ( Riser Pipa Air Kotor ) M1 125.02
dia. 100 ( Pipa Air Kotor ) M 1
16.00
- dia. 100 ( Riser Pipa Air Bekas ) M1 125.02
dia. 50 ( Pipa Air Bekas ) M1 107.20
- Dop, dia. 50 M 1
16.00
V-Trap dia. 50 bh 16.00
- Portable Grease Trap bh 16.00

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak )
M1 59.84
- dia. 80 ( Riser Pipa Cucian )
M 1
70.31

Roof Drain, Cast Iron


- dia. 80 bh 2.00

4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80
M1 250.05

- Dia. 50
M 1
16.00

- Dia. 32
M1 115.20

5. INSTALASI PANEL

Page 6 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

Pengadaan dan pemasangan PP-LT.2 unit 1.00


dengan komponen panel, sbb :
- MCCB 3P, 16 A

- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel

- KW-meter/1ph/6A bh 16.00

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 16.00
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari MDP :
- NYY 4 x 4 mm2 + E-NYA 4 mm2 ke PP-LT.1 M1 3.60

b. Kabel Distribusi Daya dari PP-LT.2 ke :


- NYM 3 x 4 mm2 ke P-Unit/1
M1 23.20
- NYM 3 x 4 mm2 ke P-Unit/2
M1 32.80
- NYM 3 x 4 mm2 ke P-Unit/3
M1 34.80
- NYM 3 x 4 mm2 ke P-Unit/4
M 1
46.70
- NYM 3 x 4 mm2 ke P-Unit/5
M 1
24.20
- NYM 3 x 4 mm2 ke P-Unit/6
M1 33.80
- NYM 3 x 4 mm2 ke P-Unit/7
M1 35.80
- NYM 3 x 4 mm2 ke P-Unit/8
M1 47.70
- NYM 3 x 4 mm2 ke P-Unit/9
M 1
51.50
- NYM 3 x 4 mm2 ke P-Unit/10
M 1
62.80
- NYM 3 x 4 mm2 ke P-Unit/11
M1 63.80
- NYM 3 x 4 mm2 ke P-Unit/12
M1 76.30
- NYM 3 x 4 mm2 ke P-Unit/13
M 1
52.50
- NYM 3 x 4 mm2 ke P-Unit/14
M 1
63.80
- NYM 3 x 4 mm2 ke P-Unit/15
M1 64.80
- NYM 3 x 4 mm2 ke P-Unit/16
M1 77.30

7. INSTALASI KABEL TRAY


- Kabel Tray W200 x H100
M1 56.43
- Kabel Leadder W500 x H100 (Riser) M 1
4.00

Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) 2% lot 1.00

Page 7 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


- Lampu LED 9 Watt bh 86.00
- Lampu LED 9 Watt, c/w battery charger (Selasar) bh 3.00
- Lampu LED 7 Watt bh 48.00
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 3.00
- Exit Lamp-18 watt c/w battery charger bh 3.00
- Lampu TL 1 x 36 watt, Balk bh 3.00
- Stop Kontak 1P, 220 Volt, 10A, Wall Type bh 99.00
- Saklar 1 gang bh 23.00
- Saklar 2 gang bh 65.00
- Saklar Hotel 2 gang bh 2.00

9. INSTALASI PENERANGAN & STOP KONTAK


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 146.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 99.00

A.3. PEKERJAAN LANTAI 3

1. PEMIPAAN AIR BERSIH


Pipa PPR PN10 (Incl. Fitting & Accessories)
- PPR PN10 dia. 15 M1 189.80
- PPR PN10 dia. 20 M 1
176.69
- PPR PN10 dia. 40 M 1
123.94
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas) M1 3.40
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 1.00
- dia. 20 bh 16.00
- Meter Air c/w BV dia. 20 bh 16.00

2. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
dia. 100 ( Pipa Air Kotor ) M1 125.02
- dia. 100 ( Riser Pipa Air Bekas ) M1 16.00
dia. 50 ( Pipa Air Bekas ) M1 125.02
- Dop, dia. 50 bh 107.20
- V-Trap bh 16.00
- Portable Grease Trap bh 16.00

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak )
M1 54.40
- dia. 80 ( pipa ruang cuci )
M1 70.31

4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
M1 126.94

5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.3 unit 1.00
dengan komponen panel, sbb :

Page 8 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

- MCCB 3P, 16 A

- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel

- KW-meter/1ph/6A bh 16.00

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 16.00
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari MDP :
- NYY 4 x 4 mm2 + E-NYA 6 mm2 ke PP-LT.3 M1 7.40

b. Kabel Distribusi Daya dari PP-LT.3 ke :


- NYM 3 x 4 mm2 ke P-Unit/1
M1 28.20
- NYM 3 x 4 mm2 ke P-Unit/2
M 1
37.80
- NYM 3 x 4 mm2 ke P-Unit/3
M 1
39.80
- NYM 3 x 4 mm2 ke P-Unit/4
M1 51.70
- NYM 3 x 4 mm2 ke P-Unit/5
M1 29.20
- NYM 3 x 4 mm2 ke P-Unit/6
M 1
38.80
- NYM 3 x 4 mm2 ke P-Unit/7
M 1
40.80
- NYM 3 x 4 mm2 ke P-Unit/8
M1 52.70
- NYM 3 x 4 mm2 ke P-Unit/9
M1 56.50
- NYM 3 x 4 mm2 ke P-Unit/10
M1 67.80
- NYM 3 x 4 mm2 ke P-Unit/11
M 1
68.80
- NYM 3 x 4 mm2 ke P-Unit/12
M 1
81.30
- NYM 3 x 4 mm2 ke P-Unit/13
M1 57.50
- NYM 3 x 4 mm2 ke P-Unit/14
M1 68.80
- NYM 3 x 4 mm2 ke P-Unit/15
M 1
69.80
- NYM 3 x 4 mm2 ke P-Unit/16
M 1
82.30

7. INSTALASI KABEL TRAY


- Kabel Tray W200 x H100
M1 56.43
- Kabel Leadder W500 x H100 (Riser) M1 4.00

Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) 2% lot 1.00

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


- Lampu LED 9 Watt bh 86.00

Page 9 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

- Lampu LED 9 Watt, c/w battery charger (Selasar) bh 3.00


- Lampu LED 7 Watt bh 48.00
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 3.00
- Exit Lamp-18 watt c/w battery charger bh 3.00
- Lampu TL 1 x 36 watt, Balk bh 3.00
- Stop Kontak 1P, 220 Volt, 10A, Wall Type bh 99.00
- Saklar 1 gang bh 23.00
- Saklar 2 gang bh 65.00
- Saklar Hotel 2 gang bh 2.00

9. INSTALASI PENERANGAN & STOP KONTAK


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 146.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 99.00

A.4. PEKERJAAN LANTAI 4

1. PEMIPAAN AIR BERSIH


PPR PN10 (Incl. Fitting & Accessories)
- PPR PN10 dia. 15 M1 189.80
- PPR PN10 dia. 20 M1 176.69
- PPR PN10 dia. 40 M 1
123.94
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas) M 1
3.40
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 1.00
- dia. 20 bh 16.00
- Meter Air c/w BV dia. 20 bh 16.00

2. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 150 ( Riser Pipa Air Kotor ) M1 125.02
dia. 100 ( Pipa Air Kotor ) M1 16.00
- dia. 100 ( Riser Pipa Air Bekas ) M1 125.02
dia. 50 ( Pipa Air Bekas ) M1 107.20
- Dop, dia. 50 bh 16.00
- Dop, dia. 80 bh 16.00
V-Trap dia. 50 bh 16.00

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak )
M1 54.40
- dia. 80 ( pipa ruang cuci )
M1 70.31

4. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
M1 126.94

5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.3 unit 1.00
dengan komponen panel, sbb :

Page 10 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

- MCCB 3P, 16 A

- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel

- KW-meter/1ph/6A bh 16.00

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 16.00
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari MDP :
- NYY 4 x 4 mm2 + E-NYA 6 mm2 ke PP-LT.4 M1 7.40

b. Kabel Distribusi Daya dari PP-LT.3 ke :


- NYM 3 x 4 mm2 ke P-Unit/1
M1 33.20
- NYM 3 x 4 mm2 ke P-Unit/2
M 1
42.80
- NYM 3 x 4 mm2 ke P-Unit/3
M 1
44.80
- NYM 3 x 4 mm2 ke P-Unit/4
M1 56.70
- NYM 3 x 4 mm2 ke P-Unit/5
M1 34.20
- NYM 3 x 4 mm2 ke P-Unit/6
M 1
43.80
- NYM 3 x 4 mm2 ke P-Unit/7
M 1
45.80
- NYM 3 x 4 mm2 ke P-Unit/8
M1 57.70
- NYM 3 x 4 mm2 ke P-Unit/9
M1 61.50
- NYM 3 x 4 mm2 ke P-Unit/10
M1 72.80
- NYM 3 x 4 mm2 ke P-Unit/11
M 1
73.80
- NYM 3 x 4 mm2 ke P-Unit/12
M 1
86.30
- NYM 3 x 4 mm2 ke P-Unit/13
M1 62.50
- NYM 3 x 4 mm2 ke P-Unit/14
M1 73.80
- NYM 3 x 4 mm2 ke P-Unit/15
M 1
74.80
- NYM 3 x 4 mm2 ke P-Unit/16
M 1
87.30

7. INSTALASI KABEL TRAY


- Kabel Tray W200 x H100
M1 56.43
- Kabel Leadder W500 x H100 (Riser) M1 4.00

Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) 2% lot 1.00

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


- Lampu LED 9 Watt bh 86.00

Page 11 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

- Lampu LED 9 Watt, c/w battery charger (Selasar) bh 3.00


- Lampu LED 7 Watt bh 48.00
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 3.00
- Exit Lamp-18 watt c/w battery charger bh 3.00
- Lampu TL 1 x 36 watt, Balk bh 3.00
- Stop Kontak 1P, 220 Volt, 10A, Wall Type bh 99.00
- Saklar 1 gang bh 23.00
- Saklar 2 gang bh 65.00
- Saklar Hotel 2 gang bh 2.00

9. INSTALASI PENERANGAN & STOP KONTAK


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 146.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 99.00

A.5. PEKERJAAN LANTAI ATAP

1. PEMIPAAN AIR BERSIH


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 50
M1 19.99
- PVC AW dia. 100 (Header)
M1 4.00

Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 50 bh 12.00

2. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
Roof Drain, Cast Iron
- dia. 100 bh 32.00

Roof Drain, Cast Iron


- dia. 100 bh 4.00
- dia. 80 bh 12.00

A.6. PEKERJAAN UTILITAS

1. INSTALASI PANEL

a. P-PLN unit
- MCCB 3P, 200 A : 1 bh
- Accessories & Termination : 1 lot
- Box Panel : 1 unit

b. P-MDP
Pengadaan dan pemasangan MDP, dengan komponen panel, unit 1.00
sbb :
- Mgs 3P, 200 A
- MCCB 3P, 200 A
- MCCB 3P, 80 A
- MCCB 3P, 32 A

Page 12 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

- MCB 3P, 32 A
- Contacto, (timer switch)
- Earth Fault Relay
- Over Current Relay
- Over / Under Voltage Relay
- Power Factor-meter
- Frequency-metr
- Ampere-meter 300/5 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- CT 300/5 A
- CT 50/5 A
- Fuse Carrier 4 A
- Indicator Lamp
- Rel MCCB 3P
- CU Bar 5 x 400 A
- Accessories & Termination
- Box Panel

c. P-PENGELOLA
Pengadaan dan pemasangan P-PENGELOLA unit 1.00
dengan komponen panel, sbb :
- MCCB 3P, 80 A
- MCB 3P, 63 A
- MCB 3P, 32 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 80 A
- Accessories & Termination
- Box Panel

- KW-meter/3ph/80A bh 1.00

d. P-POMPA AIR BERSIH


Pengadaan dan pemasangan P-POMPA AIR BERSIH, dengan kompo- unit 1.00
nen panel, sbb :
- MCB 3P, 32 A
- MCB 3P, 10 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Radar diantaki air atas
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A

Page 13 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

- Accessories & Termination


- Box Panel

e. P-POMPA HYDRANT
Pengadaan dan pemasangan P-POMPA HYDRANT, dengan kompo- unit 1.00
nen panel, sbb :
- MCB 3P, 40 A
- MCB 3P, 16 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A
- Accessories & Termination
- Box Panel

2. INSTALASI KABEL FEEDER


- NYY 4 x 70 mm2 + E-NYA 35 mm2 Dari P-PLN ke MDP
M1 50.00

Kabel Distribusi Daya dari MDP :


- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-PENGELOLA-LT.1
M1 57.00
- FRC 4 x 6 mm2 + E-NYA 6 mm2 ke P. Hydrant
M 1
60.00
- NYY 4 x 6 mm2 + E-NYA 4 mm2 ke P. Pompa Booster
M1 94.00

Kabel Distribusi Daya dari P-PENGELOLA :


- NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih
M1 40.00
- NYY 4 x 4 mm2 + E-NYA 4 mm2 ke P-Shallow Well Pump
M1 40.00
- NYY 4 x 4 mm2 + E-NYA 4 mm2 ke Box MCB R. Serbaguna
M1 26.50

3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


a. Ruang Pompa
- TL 1 x 18 W, TL Balk Type bh 2.00
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 1.00
- Saklar 1 gang bh 2.00

b. Lampu Taman
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt bh 12.00
- Memasang Lampu PJU Tiang Octagonal Single Hotdip Galvanis,(t = 7 m) ttk 4.00

4. INSTALASI PENERANGAN & STOP KONTAK


a. Ruang Pompa
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 2.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 1.00

b. Lampu Taman
- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk 12.00
- Kabel Power Ins. PJU, NYFGBY 3 x 2,5 mm2 dari P.PJU ttk 4.00

- Testing & Commissioning lot 1.00

Page 14 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

A.7. PEKERJAAN SISTEM PENTANAHAN

1. INSTALASI
Pentanahan (Grounding) Netral Sistem & Pentanahan Body

a. - Body Panel
Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1.00
- Kabel BC 50 mm2
M1 30.00
- Testing & Commissioning lot 1.00

b. - Body Peralatan pada Sistem Elektronik


Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1.00
- Kabel BC 50 mm2
M1 30.00
- Testing & Commissioning lot 1.00

A.8. PEKERJAAN PENANGKAL PETIR (FARADAY)

1. AIR TERMINAL & TERMINATION NETWORK


a. 15 x 500mm alumunium air rod bh 9.00
b. 15 mm Air terminal base bh 9.00
c. 25 x 3mm Bare Alumunium Tape
M 1
158.00
d. Grey 25x3mm Non-Metallic DC tape clip bh 11.00
e. 25 x 3mm Alumunium Square tape clamp bh 10.00

2. DOWN CONDUCTOR
a. 25 x 3mm Bare Alumunium Tape
M1 3.00
b. Grey 25 x 3mm Non-Metallic DC tape clip bh 3.00
c. 25 x 3mm Alumunium Square tape clamp bh 15.00
d. Test Connection Link bh 3.00

3. GROUNDING SYSTEM
a. Polymer Inspection Pit bh 3.00
b. 5/8" x 1800 mm Extensible Copperbond Rod bh 3.00
c. 5/8" Rod Coupling bh 3.00
d. Exothermic weilding bh 6.00
e. Stranded Bar copper conductor 70 mm M1 188.00

4. MATERIAL SUPPORT
a. Mould for looping unit 1.00
b. Powder unit 6.00
c. Handle Clamp unit 1.00
d. flint gun unit 1.00

5. TESTING & COMMISSIONING


a. Testing & Commissioning lot 1.00
b. Biaya Perijinan Depnaker lot 1.00

Page 15 of 26
BOQ (Billl Of Quantity)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN MBR PEMERINTAH KOTA MADIUN


TIPE PROTOTYPE : TIPE 36
JUMLAH LANTAI : 4 LANTAI
TAHUN ANGGARAN : 2022 - 2023

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

IV.B. PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART

B.1. PEKERJAAN PEMADAM KEBAKARAN

I INSTALASI APAR

a LANTAI 1
- Pipa BS Sch.40
dia. 4" (Riser) m 5.00
dia. 3" m 35.80
- Fitting & Accessories lot 1.00
- Hydrant Box Indoor (Size 100x80x18) bh 1.00
- Gate Valve
dia. 3" bh 1.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 6.00

b LANTAI 2
- Pipa BS Sch.40
dia. 4" (Riser) m 4.00
dia. 3" m 35.60
- Fitting & Accessories lot 1.00
- Hydrant Box Indoor (Size 100x80x18) bh 1.00
- Gate Valve
dia. 3" bh 1.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 6.00

c LANTAI 3
- Pipa BS Sch.40
dia. 4" (Riser) m 4.00
dia. 3" m 35.96
- Fitting & Accessories lot 1.00
- Hydrant Box Indoor (Size 100x80x18) bh 1.00
- Gate Valve
dia. 3" bh 1.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 6.00

d LANTAI 4
- Pipa BS Sch.40
dia. 4" (Riser) m 4.00

Page 16 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

dia. 3" m 35.96


- Fitting & Accessories lot 1.00
- Hydrant Box Indoor (Size 100x80x18) bh 1.00
- Gate Valve
dia. 3" bh 1.00
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 6.00

e SITE PLAN
- Pipa BS Sch.40
dia. 4" m 213.00
- Fitting & Accessories lot 1.00
- Hydrant Box Outdoor bh 4.00
- Hydrant Pillar bh 4.00
- Seamesse connection bh 4.00
- Gate Valve
dia. 4" bh 5.00
- Check Valve
dia. 4" bh 1.00

B.2. PEKERJAAN VENTILASI UDARA


A Exhaust Fan
1 LANTAI 1 - 4
- Exhaust kap 100 Cfm ( ceiling Mounted ) unit 305
- Kipas Angin Baling unit 4

Pipa PVC Class D

- dia. 100 m 834.176


- Grille 200 x 200 (Alumunium) bh 305
- Install Kipas Angin Baling (Kabel NYM 3x2,5 mm2 + Conduit pipa dia. 20) titik 4

B.3. PEKERJAAN INSTALASI ELEKTRONIK

I PEKERJAAN SYSTEM TV

a PERALATAN UTAMA SYSTEM TV

Pengadaan dan pemasangan peralatan utama Sistem TV di-


tempatkan di Lantai Atap, dipasang secara lengkap termasuk
pondasi dan tiang penyangga sesuai diuraikan dalam Gam-
bar dan Spesifikasi Teknis.

- Antena UHF unit 1.00


- Antena VHF unit 1.00
- MA (Master Amplifier) / Mixer bh 1.00
- Coaxial 7C/2V, dari Antena ke Mixer m 50.00
- Termination & supporting material lot 1.00

b SPLITTER TV

Page 17 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

Pengadan dan pemasangan Splitter TV, berikut alat / material


bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis.

LANTAI 1
Splitter 7 ports bh 3.00
TB-Splitter-TV/LT.1 bh 1.00

Lantai 2
Splitter 7 ports bh 4.00
TB-Splitter-TV/LT.2 bh 1.00

Lantai 3
Splitter 7 ports bh 4.00
TB-Splitter-TV/LT.3 bh 1.00

Lantai 4
Splitter 7 ports bh 4.00
TB-Splitter-TV/LT.3 bh 1.00

c INSTALASI KABEL FEEDER SPLITTER TV

Instalasi Kabel Feeder Splitter TV menggunakan kabel coaxial


berikut semua aksesoris, material / alat bantu pemasangan
sesuai detail Gambar dan Spesifikasi Teknis.

Lantai 1
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Splitter-Lt.1 m 10.00

Lantai 2
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Splitter-Lt.2 m 15.00

Lantai 3
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-Lt.3 m 20.00

Lantai 4
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-Lt.3 m 25.00

d TV OUTLET

Pengadan dan pemasangan TV Outlet, breikut alat / material


bantu pemasangan lainnya sesuai Gambar dan Spesifikasi
Teknis.

Lantai 1
TV Outlet bh 13.00

Lantai 2
TV Outlet bh 16.00

Page 18 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

Lantai 3
TV Outlet bh 16.00

Lantai 4
TV Outlet bh 16.00

e INSTALASI OUTLET TV

Instalasi kabel Outlet TV menggunakan kabel Coaxial 5C/2V


dalam conduit PVC HI dia.20 mm2 lengkap dengan bobokan
dan perapihan kembali, peralatan bantu dan aksesoris sesuai
detail Gambar dan Spesifikasi Teknis.

Lantai 1
TV Outlet ttk 13.00

Lantai 2
TV Outlet ttk 16.00

Lantai 3
TV Outlet ttk 16.00

Lantai 4
TV Outlet ttk 16.00

II PEKERJAAN FIRE ALARM


a PERALATAN UTAMA FIRE ALARM SYSTEM

Pengadaan dan pemasangan peralatan Sistem Fire Alarm


ditempatkan di Ruang Kontrol secara lengkap termasuk peng-
kabelan dan koneksi meliputi peralatan sesuai diuraikan dlm
Gambar dan Spesifikasi Teknis, tetapi tidak terbats pada item
sebagai berikut :

MCFA, kapasitas 10 Zone unit 1.00


MDF, kapasitas 10 Zone set 1.00
Rectifier bh 1.00
Power Surge Arrester bh 1.00
Battery & Charger 4 jam bh 1.00
Grounding u/ MCFA dan Surge Arrester ( R < 0,5 Ohm ) lot 1.00

b INSTALASI KABEL FEEDER FIRE ALARM

INSTALASI FEEDER MELALUI RISER / SHAFT

Kabel NYA 5 x 2 x 2,5 mm2 in conduit Dia.32 dari MCFA ke MDF m 28.00
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.1 m 2.00
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.2 m 6.00
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.3 m 12.00

Page 19 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

c PERALATAN PENGINDERA dan PENANDA KEBAKARAN

Pengadaan dan pemasangan peralatan pengindera dan penan-


da kebakaran berikut alat / material bantu lainnya sesuai Gam-
bar dan Spesifikasi Teknis.

Lantai-1
- Smoke Detector bh 56.00
- Rate Of Rise Temperature - Heat detector bh 4.00
Fixed Heat Detector bh 10.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-LT.1 bh 1.00

Lantai-2
- Smoke Detector bh 53.00
- Rate Of Rise Temperature - Heat detector bh 4.00
Fixed Heat Detector bh 16.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-LT.2 bh 1.00

Lantai-3
- Smoke Detector bh 53.00
- Rate Of Rise Temperature - Heat detector bh 4.00
Fixed Heat Detector bh 16.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-LT.3 bh 1.00

Lantai-4
- Smoke Detector bh 53.00
- Rate Of Rise Temperature - Heat detector bh 4.00
Fixed Heat Detector bh 16.00
- Manual push button bh 1.00
- Lampu Indikator bh 1.00
- Bell alarm bh 1.00
- End of Line Resistor bh 2.00
- TB-FA-LT.3 bh 1.00

d PERALATAN PENGINDERA dan PENANDA KEBAKARAN

Instalasi titik detector dari TB-FA dengan kabel NYA 2 x 1,5 mm2
didalam conduit dia. 20 mm2 lengkap dengan aksesoris dan
semua peralatan / material bantu pemasangan sesuai detail

Page 20 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

Gambar dan Spesifikasi Teknis.

Lantai-1
- Detector Fire Alarm ttk 70.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00

Lantai-2
- Detector Fire Alarm ttk 73.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00

Lantai-3
- Detector Fire Alarm ttk 73.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00

Lantai-4
- Detector Fire Alarm ttk 73.00
- Manual push button ttk 1.00
- Lampu Indikator ttk 1.00
- Bell alarm ttk 1.00

Testing & Comissioning included perijinan dari DEPNAKER lot 1.00

III PEKERJAAN CCTV

a PERALATAN UTAMA CCTV


- Digital Video Recorder (DVR) unit 1.00
16 Channel Real Time Standalone DVR,
2 Ch Output, MPEG4, HDD 1 TB x 2
- LCD Monitor 32" bh 1.00
- UPS 1 Kva bh 1.00
- Surge Arrester (15 KA) bh 1.00
- Grounding u/ MDF-CCTV dan Surge Arrester ( R < 1 Ohm ) lot 1.00

b INSTALASI CCTV
Lantai 1
- Dome Camera Colour Fixed w/ Varifocal Lens bh 4.00
- Instalasi Camera Fixed Dome Indoor ttk 4.00
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)

Lantai 2
- Dome Camera Colour Fixed w/ Varifocal Lens bh 4.00
- Instalasi Camera Fixed Dome Indoor ttk 4.00
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)

Page 21 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

Lantai 3
- Dome Camera Colour Fixed w/ Varifocal Lens bh 4.00
- Instalasi Camera Fixed Dome Indoor ttk 4.00
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)

Lantai 4
- Dome Camera Colour Fixed w/ Varifocal Lens bh 4.00
- Instalasi Camera Fixed Dome Indoor ttk 4.00
Coaxial Cable (Kabel Data)
NYM 3 x 1,5 mm2 (Kabel Power)

IV PEKERJAAN TATA SUARA

a PERALATAN UTAMA TATA SUARA


- MDF-SS unit 1.00
- Speaker selector 10 zone unit 1.00
- Power amplifire (evac) 120 W unit 2.00
- Equalizer unit 1.00
- Mixer Pre-Amp unit 1.00
- Mic paging evac (di ruang operator) bh 1.00
- Sirine module set 1.00
- UPS 1 Kva bh 1.00
- Surge Arrester (15 KA) bh 1.00
- Grounding u/ MDF-SS dan Surge Arrester ( R < 1 Ohm ) lot 1.00

b INSTALASI TATA SUARA


Lantai 1
- Ceiling speaker 3 W bh 8.00
- TBTS-LT.1 bh 1.00
- Instalasi sound system (NYMHY 2 x 1,5 mm2) ttk 8.00

Lantai 2
- Ceiling speaker 3 W bh 7.00
- TBTS-LT.2 bh 1.00
- Instalasi sound system (NYMHY 2 x 1,5 mm2) ttk 7.00

Lantai 3
- Ceiling speaker 3 W bh 7.00
- TBTS-LT.2 bh 1.00
- Instalasi sound system (NYMHY 2 x 1,5 mm2) ttk 7.00

Lantai 4
- Ceiling speaker 3 W bh 7.00
- TBTS-LT.2 bh 1.00
- Instalasi sound system (NYMHY 2 x 1,5 mm2) ttk 7.00

Page 22 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

B.4. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)

I PEKERJAAN INSTALASI PLUMBING

I.1 INSTALASI AIR BERSIH


PERALATAN UTAMA
Pengadaan dan pemasangan unit
1 Lift Pump bh 2.00
Kapasitas : 200 l/menit
Head : 36 mtr
Speed : 2900 rpm
PI : 5,5 KW/380V/50Hz/3ph
1 duty, 1 standby ( bergantian), lengkap dengan set 1.00
panel control, wlc di Tanki Air Atas dan accessories

2 Booster Pump / Distribution Pump set 1.00


Type : Packaged Booster Pump
Kapasitas : 2 x 120 l/menit
Head : 20 mtr
Speed : 1450 rpm
Daya : 2,2 KW/380V/50Hz/3ph
Operasi : 2 Parallel Alternate
( lengkap dengan Pump & Electromotor, Pressure Tank, Panel Kontrol, Pressure switch,
Presure Gauge, Accessories, Gate Valve, Header & base Plat )

Filter Pump
Type : Centrifugal End Suction set 1.00
Kapasitas : 200 LPM ; 30 M
Power : 2.2 kw

Speed : 1450 rpm


Operation : 1 Duty ; 1 stand by

1 duty, 1 standby ( bergantian), lengkap dengan set 1.00


panel control, wlc di Tanki Air Atas dan accessories

3 Sand Filter dan Carbon Filter Tank set 1.00


Type : Manual Backwash
Kapasitas : 200 Lpm
Material : Mild steel / fiber
Media Filter : Carbon aktive
c/w : valve & accessories

4 Tangki Air Atas ( Type Cylinder ) unit 2.00


Kapasitas : 6 m3
Toren Tangki Air Stainless Steel, lengkap dengan Assesories dan dudukan/ pondasi

7 ACCESSORIES POMPA AIR BERSIH


- Gate Valve
dia. 125 ( Untuk Penghubung/penyeimbang GWT) bh 2.00
dia. 80 ( Untuk Penghubung/penyeimbang GWT) bh 2.00
dia. 50 bh 10.00

Page 23 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

Butterfly Valve
dia. 100 bh 3.00
- Check Valve ( CV )
dia. 50 bh 4.00
- Strainer ( STR )
dia. 50 bh 4.00
- Flexible Joint ( FJ )
dia. 50 bh 8.00
- Foot Valve
dia. 50 bh 2.00
dia. 80 bh 2.00
- Pressure Gauge bh 4.00
- GIP med dia. 100 ( pipa header ) set 2.00
GIP med dia. 125 ( Pipa inlet Pompa Hydrant ) m 5.00
GIP med dia. 125 ( Pipa Penyeimbang GWT) m 4.00
- Instalasi pemipaan area pompa 10% lot 1.00
c/w fiting-fitting & support.
- Meteran Air c/w GV dia. 50 & Box Meteran unit 1.00

8 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
a SITE PLAN
1. Dari Box Meter PDAM ke GWT
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) m 10.00
2. Pemipaan R.Pompa ke Tanki Air Atas
- GIP dia. 50 m 46.38

b Penyambungan pipa PDAM, pipa gip dia. 65 termasuk lot


Perijinan.

I.2 INSTALASI AIR KOTOR & AIR BEKAS


1 Septic Tank ( Sewage Treatment Plant ) unit 2.00
Kapasitas : 12 m3

Pipa PVC AW Ø100 (dari STP ke Riol) M' 50.00

2 TESTING COMMISSIONING lot 1.00

II PEKERJAAN INSTALASI PEMADAM KEBAKARAN

II.1 INSTALASI PEMADAM KEBAKARAN


PERALATAN UTAMA

1 Diesel Fire Pump unit 1.00


Type : Centrifugal end suction
Kapasitas : 500 Gpm, 11 Bar
Daya : 89 HP
Operasi : Automatic ON - Manual OFF
( Pompa sudah termasuk Panel Kontrol Automatic Fire Pump )
Comply to NFPA 20 Standard

Page 24 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

2 Jockey Fire Pump unit 1.00


Type : Vertical Multi Stage
Kapasitas : 25 Gpm, 12 Bar
Daya : 4 Kw / 5,5 HP / 2900 Rpm / 380V / 50Hz
Operasi : Automatic ON-OFF
( Pompa sudah termasuk Panel Kontrol Automatic Fire Pump )
Comply to NFPA 20 Standard

3 ACCESSORIES POMPA HYDRANT


- Gate Valve
dia. 100 mm bh 6.00
dia. 50 mm bh 2.00
dia. 25 mm bh 1.00
- Strainer
dia. 100 mm bh 2.00
dia. 50 mm bh 1.00
- Check Valve
dia. 100 mm bh 1.00
dia. 50 mm bh 1.00
- Flexible Joint
dia. 100 mm bh 3.00
dia. 50 mm bh 2.00
- Foot Valve
dia. 100 mm bh 1.00
dia. 50 mm bh 1.00
- Safety valve dia 100 bh 1.00
- Flow Meter (FM) dia 100 bh 2.00
- Automatic Air Vent dia 25 bh 1.00
- Pressure Gauge bh 2.00
- Pressure Switch bh 1.00
- Pipa BSP Sch.40 dia. 200 ( pipa header ) set 2.00
Pipa BSP Sch.40 dia. 100 ( dari header ke riser gedung) m 40.00
- Pemipaan area pompa
Pipa Sch.40 ASTM A-120 (warna Putih )
Dari Pompa ke Ground Tank (dia 100) m 6.00
Dari Pompa ke Ground Tank (dia 50) m 6.00

III PENYAMBUNGAN DAYA PLN

1 Pekerjaan Pasang Baru Daya Listrik PLN 131 KVA (131.000 VA) Lot 1
- BP ( Biaya penyambungan )
- UJL ( Uang Jaminan Langanan )
- Biaya Instalatir
- Concuil
- Pemasangan dan material yang dibutuhkan, seperti ;
( kabel, tiang, pondasi, galian & urugan kembali, dll )

IV PEKERJAAN INSTALASI KABEL FEEDER


Kabel Distribusi Daya dari Panel Pompa - Air Bersih
- NYY 4 x 4 mm2 ke LP-1 m' 10.00

Page 25 of 26
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

- NYY 4 x 4 mm2 ke LP-2 m' 10.00

NYY 4 x 4 mm2 ke FP-1 m' 10.00

NYY 4 x 4 mm2 ke FP-2 m' 10.00

Kabel Distribusi Daya dari Panel Hydrant


- NYY 4 x 4 mm2 ke Jockey Pump m' 10.00
- NYY 2(3 x 2,5) mm2 ke Diesel Fire Pump m' 10.00

Kabel Distribusi Daya dari P. Pompa Booster


- NYY 4 x 2,5 mm2 ke Pompa Booster 1 m' 2.00
- NYY 4 x 2,5 mm2 ke Pompa Booster 2 m' 2.00

- Proteksi Kabel dengan Pipa Gip Dia 100 m' 20.00

Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya

- Testing & Commissioning lot 1.00

Page 26 of 26

Anda mungkin juga menyukai