REKAPITULASI

PEKERJAAN PRELIMENERIES, STRUKTUR, ARSITEKTUR


MEP DAN INTERIOR

NO. ITEM HARGA TOTAL (Rp)

1 PRELIMINERIES
1 PEKERJAAN PERSIAPAN, PRASARANA DAN PENUNJANG

2 STRUKTUR

2.1 SUB TOTAL PEKERJAAN PEMATANGAN LAHAN


2.2 SUB TOTAL PEKERJAAN PANCANG
2.3 SUB TOTAL PEKERJAAN STRUKTUR BAWAH
2.4 SUB TOTAL PEKERJAAN STRUKTUR ATAS
2.5 SUB TOTAL PEKERJAAN STRUKTUR GONDOLA DAN TOPI
2.6 SUB TOTAL PEKERJAAN KOLAM RENANG
2.7 SUB TOTAL PEKERJAAN ATAP
2.8 SUB TOTAL PEKERJAAN LAIN - LAIN

3 ARSITEKTUR

3.1 SUB TOTAL PEKERJAAN DINDING


3.2 SUB TOTAL PEKERJAAN PLESTERAN + ACIAN
3.3 SUB TOTAL PEKERJAAN TAMPAK LUAR ( FAÇADE )
3.4 SUB TOTAL PEKERJAAN SCREEDING
3.5 SUB TOTAL PEKERJAAN DI LUAR BANGUNAN
3.6 SUB TOTAL PEKERJAAN PINTU JENDELA
3.7 SUB TOTAL PEKERJAAN PELAPIS LANTAI
3.8 SUB TOTAL PEKERJAAN PLAFOND
3.9 SUB TOTAL PEKERJAAN CAT
3.10 SUB TOTAL PEKERJAAN LAIN - LAIN
3.11 SUB TOTAL PEKERJAAN SANITARY

4 MEKANIKAL, ELEKTRIKAL DAN PLUMBING

4.1 PEKERJAAN PLUMBING


4.1.1 SUB TOTAL PERALATAN UTAMA
4.1.2 SUB TOTAL PEMIPAAN RUANG POMPA
4.1.3 SUB TOTAL PEMIPAAN AIR BERSIH
4.1.4 SUB TOTAL PEMIPAAN AIR BERSIH FLUSHING
4.1.5 SUB TOTAL PEMIPAAN AIR KOTOR
4.1.6 SUB TOTAL PEMIPAAN AIR DRAIN
4.1.7 SUB TOTAL PEMIPAAN AIR HUJAN
4.1.8 SUB TOTAL PEMIPAAN VENT
4.1.9 SUB TOTAL PEMIPAAN AIR PANAS
4.1.10 SUB TOTAL SYSTEM KOLAM RENANG

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


4.2 PEKERJAAN PEMADAM KEBAKARAN
4.2.1 SUB TOTAL PERALATAN UTAMA
4.2.2 SUB TOTAL PEKERJAAN RUANG POMPA
4.2.3 SUB TOTAL PEKERJAAN FIRE HOSE CABINET

Hal 1/107
REKAPITULASI
PEKERJAAN PRELIMENERIES, STRUKTUR, ARSITEKTUR
MEP DAN INTERIOR

NO. ITEM HARGA TOTAL (Rp)

4.2.4 SUB TOTAL PEKERJAAN OUTDOOR HYDRANT BOX


4.2.5 SUB TOTAL PEKERJAAN HEAD SPRINKLER
4.2.6 SUB TOTAL PEKERJAAN PORTABLE FIRE EXTINGUISHER
4.2.7 SUB TOTAL PEKERJAAN PEMIPAAN, KATUP DAN AKSESORIS
4.2.8 SUB TOTAL PEKERJAAN BRANCH CONTROL VALVE

4.3 PEKERJAAN MVAC


4.3.1 SUB TOTAL PEKERJAAN AC LANTAI BASEMENT
4.3.2 SUB TOTAL PEKERJAAN AC LANTAI 1
4.3.3 SUB TOTAL PEKERJAAN AC LANTAI 2
4.3.4 SUB TOTAL PEKERJAAN AC LANTAI 3
4.3.5 SUB TOTAL PEKERJAAN AC LANTAI 4
4.3.6 SUB TOTAL PEKERJAAN AC LANTAI 5
4.3.7 SUB TOTAL PEKERJAAN AC LANTAI 6
4.3.8 SUB TOTAL PEKERJAAN AC LANTAI 7
4.3.9 SUB TOTAL PEKERJAAN AC LANTAI 8
4.3.10 SUB TOTAL PEKERJAAN AC LANTAI 9
4.3.11 SUB TOTAL PEKERJAAN AC LANTAI 10
4.3.12 SUB TOTAL PEKERJAAN AC LANTAI 11
4.3.13 SUB TOTAL PEKERJAAN AC LANTAI 12
4.3.14 SUB TOTAL PEKERJAAN AC LANTAI 13
4.3.15 SUB TOTAL PEKERJAAN AC LANTAI 14
4.3.16 SUB TOTAL PEKERJAAN AC LANTAI DAK ATAP

4.4 PEKERJAAN ELEKTRIKAL


4.4.1 SUB TOTAL PEKERJAAN PENGADAAN & PEMASANGAN FIXTURE
4.4.2 SUB TOTAL PEKERJAAN TRANSFORMATOR
4.4.3 SUB TOTAL PEKERJAAN PANEL TEGANGAN MENENGAH
4.4.4 SUB TOTAL PEKERJAAN PANEL TEGANGAN RENDAH
4.4.5 SUB TOTAL PEKERJAAN PENGADAAN & PEMASANGAN KABEL DISTRIBUSI

4.4.6 SUB TOTAL PEKERJAAN INSTALASI PENANGKAL PETIR


4.4.7 SUB TOTAL PEKERJAAN TESTING & COMMISSIONING

4.5 PEKERJAAN FIRE ALARM


4.5.1 SUB TOTAL PEKERJAAN PERALATAN, PANEL & KABEL UTAMA
4.5.2 SUB TOTAL PEKERJAAN LANTAI BASEMENT
4.5.3 SUB TOTAL PEKERJAAN LANTAI 1
4.5.4 SUB TOTAL PEKERJAAN LANTAI 2
4.5.5 SUB TOTAL PEKERJAAN LANTAI 3
4.5.6 SUB TOTAL PEKERJAAN LANTAI 4-11
4.5.7 SUB TOTAL PEKERJAAN LANTAI 12-13
4.5.8 SUB TOTAL PEKERJAAN LANTAI 14
4.5.9 SUB TOTAL PEKERJAAN LANTAI ATAP
4.5.10 SUB TOTAL PEKERJAAN KABEL FEEDER

4.6 PEKERJAAN TATA SUARA


4.6.1 SUB TOTAL PEKERJAAN PERALATAN, PANEL & KABEL UTAMA
4.6.2 SUB TOTAL PEKERJAAN LANTAI BASEMENT
4.6.3 SUB TOTAL PEKERJAAN LANTAI 1

Hal 2/107
REKAPITULASI
PEKERJAAN PRELIMENERIES, STRUKTUR, ARSITEKTUR
MEP DAN INTERIOR

NO. ITEM HARGA TOTAL (Rp)

4.6.4 SUB TOTAL PEKERJAAN LANTAI 2


4.6.5 SUB TOTAL PEKERJAAN LANTAI 3
4.6.6 SUB TOTAL PEKERJAAN LANTAI 4-11
4.6.7 SUB TOTAL PEKERJAAN LANTAI 12-13
4.6.8 SUB TOTAL PEKERJAAN LANTAI 14
4.6.9 SUB TOTAL PEKERJAAN LANTAI ATAP

4.7 PEKERJAAN TELEPON

4.8 PEKERJAAN MATV DAN DATA

4.9 PEKERJAAN CCTV

4.10 PEKERJAAN TRAY KABEL


4.10.1 SUB TOTAL PEKERJAAN TRAY KABEL ELEKTRIKAL
4.10.2 SUB TOTAL PEKERJAAN TRAY KABEL ELEKTRONIK

4.11 PEKERJAAN INSTALASI GAS KITCHEN

4.12 SUB TOTAL PEKERJAAN PENGADAAN DAN PEMASANGAN LIFT


4.13 SUB TOTAL PEKERJAAN PENGADAAN DAN PEMASANGAN GENSET
4.14 SUB TOTAL PEKERJAAN SEWAGE TREATMENT PLAN
4.15 SUB TOTAL PEKERJAAN SAMBUNG DAYA DAN SKTR

5 INTERIOR

5.1 SUB TOTAL PEKERJAAN INTERIOR LANTAI BASEMENT


5.2 SUB TOTAL PEKERJAAN INTERIOR LANTAI 1
5.3 SUB TOTAL PEKERJAAN INTERIOR LANTAI 2
5.4 SUB TOTAL PEKERJAAN INTERIOR LANTAI 3
5.5 SUB TOTAL PEKERJAAN INTERIOR LOBBY LIFT (LT.1-14) & KORIDOR (LT. 4-14)
5.6 SUB TOTAL PEKERJAAN INTERIOR KAMAR HOTEL
5.7 SUB TOTAL PEKERJAAN INTERIOR LANTAI 14

Hal 3/107
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO.1.1 : PEKERJAAN PERSIAPAN, PRASARANA DAN PENUNJANG
HALAMAN : 4

HARGA TOTAL (Rp)


NO. URAIAN PEKERJAAN SAT VOL

1 BIAYA UMUM PROYEK ls 1

Proyek Manajemen dan Biaya-Biaya Administrasi Lapangan


Biaya Pembuatan Dokumen Kontrak
Pengadaan Gambar-Gambar Pelaksanaan (Shop Drawing)
Gambar Terlaksana (As Built Drawing)
Laporan dan Foto-Foto Kemajuan Pekerjaan
Penyiapan Dokumen SOP dan Pelatihan
Asuransi
Pengurusan dan Mendapatkan Ijin-Ijin

2 SARANA DAN PRASARANA LAPANGAN ls 1

Kantor Direksi di Lapangan


Kantor dan Gudang Sementara Kontraktor
Papan Nama Proyek Reklame dan Printing
Akomodasi Rapat Lapangan
Pertanggungan Biaya atas Peninjauan Lokasi, Ijin Pemasukan Peralatan ke Lokasi
Pengadaan Sumber Air Bersih
Pengadaan Tenaga Listrik
Penyediaan Fasilitas Komunikasi

3 BIAYA PERSIAPAN LAPANGAN ls 1

Pengukuran dan Bouwplank Setting Out, Centre Line Marking

4 BIAYA SAFETY DAN MANAJEMEN K-3L ls 1

Jalan Masuk Tempat Pekerjaan dan Jalan Sementara


Saluran Sementara
Kebersihan dan Kerapihan
Alat-Alat Keselamatan Kerja
P 3 K dan Pemadam Kebakaran
Keamanan Proyek, Perlindungan Pekerjaan
Proteksi Hasil Pekerjaan
Perlindungan Lobang

5 BIAYA PENGUJIAN BAHAN, PEKERJAAN TESTING KOMISIONING ls 1

Persetujuan Contoh-Contoh Bahan


Pemeriksaan dan Pengujian Bahan
Biaya Supervisi, Penyambungan, Testing dan Komisioning

6 BIAYA PERALATAN KERJA ls 1

Peralatan dan perlengkapan Kerja yang Lengkap (Termasuk Pengadaan Tower Crane,
Passenger Hoist, dan Peralatan Lainnya).
Pengukuran (Kalibrasi) Alat-Alat, Demi Kelancaran Pelaksanaan Termasuk Pemeliharaan dan
Pemindahan Dalam Lokasi Pekerjaan Serta Mengeluarkan Setelah Penyelesaian Pekerjaan.

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN PERSIAPAN, PRASARANA DAN PENUNJANG
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 2 : PEKERJAAN STRUKTUR
HALAMAN : 5
HARGA SATUAN (Rp)
HARGA TOTAL
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL (Rp)
UPAH MATERIAL

2 PEKERJAAN STRUKTUR

2.1 SUB PEKERJAAN PEMATANGAN LAHAN

2.1.1 PEKERJAAN PERSIAPAN


2.1.1.1 Pembuatan jalan akses sementara M2 -

2.1.2 PEKERJAAN GORONG-GORONG


2.1.2.1.1 Galian & Pemadatan M2 -
2.1.2.1.2 Urugan pasir dibawah gorong-gorong 10 cm M2 -
2.1.2.1.3 Lantai Kerja 5 cm M2 -
2.1.2.1.4 Urugan kembali M3 -
2.1.2.1.5 gorong-gorong beton dia. 1.5 M (precast) M -

2.1.3 PEKERJAAN PAGAR (PANEL BETON)


2.1.3.1 Area Belakang
2.1.3.1.1 Turap Batu Kali campuran 1:5 M3 -
2.1.3.1.2 Sloof K-300
2.1.3.1.2.1 Besi Ø 16 btg -
2.1.3.1.2.2 Besi Ø 8 btg -
2.1.3.1.2.3 Beton M -
2.1.3.1.3 Panel Beton
2.1.3.1.3.1 Panel Beton pcs -
2.1.3.1.3.2 Kolom pcs -
2.1.3.2 Area Depan
2.1.3.2.1 Turap Batu Kali campuran 1:5 M3 -
2.1.3.2.2.1 Besi Ø 16 btg -
2.1.3.2.2.2 Besi Ø 8 btg -
2.1.3.2.2.3 Beton M -
2.1.3.2.3 Pagar Keliling diatas turap batu kali
2.1.3.2.3.1 BJLS Gelombang 0,9 M -
-
2.1.4 PINTU GERBANG SENG unit -
Rangka Utama Pipa, Pembagi Hollow Kunci, Roda (10m)

2.1.5 URUGAN TANAH BONCOS (TANAH URUG)


ket: padat dozer M3 -

2.1.6 PEKERJAAN TANAH


2.1.6.1 Galian tanah dengan alat berat.
2.1.6.1.1 Pit Lift M3 -
2.1.6.1.2 Sumpit M3 -
2.1.6.1.3 STP M3 -
2.1.6.1.4 Ground Tank M3 -
2.1.6.2 Galian tanah manual
2.1.6.2.1 Pile Cap M3 -
2.1.6.2.2 Tie Beam M3 -
2.1.6.3 Urugan tanah kembali termasuk pemadatan
2.1.6.3.1 Lantai Basement M3 -

2.1.6.4 Buang tanah keluar lokasi proyek M3 -

Dibawah Plat Lt. Basement, Pile


Pasir urug tebal 100 mm termasuk
2.1.6.5 Cap, tie Beam, Pit Lift, Sumpit, M3 -
pemadatan
Ground Tank, & STP.

Anti rayap dengan system spray atau Sekeliling 1 M area dan bawah
2.1.6.6 M2 -
injection sesuai dengan spesifikasi. Plat Basement

Dibawah Plat Lt. Basement, Pile


2.1.6.7 Lantai kerja tebal 5 cm Cap, tie Beam, Pit Lift, Sumpit, M3 -
Ground Tank, & STP.

Bobok / Potong Tiang Pancang


2.1.6.8 Ukuran 35 x 35 Cm termasuk Bh -
pembuangan keluar lokasi proyek.

2.1.7 PEKERJAAN TURAP


2.1.7.1 Pekerjaan Tanah Turap

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN STRUKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 2 : PEKERJAAN STRUKTUR
HALAMAN : 6
HARGA SATUAN (Rp)
HARGA TOTAL
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL (Rp)
UPAH MATERIAL

2.1.7.1.1 Galian Tanah Manual Ls -


2.1.7.1.2 Urugan Kembali M3 -

2.1.7.2 Pasangan Turap dibawah Tiebeam


2.1.7.2.1 Turap Batu Kali M3 -

2.1.8 PEKERJAAN SUMUR RESAPAN


2.1.8.1 Pekerjaan Galian dalam 5m M3 -
2.1.8.2 Pekerjaan buis beton dia 1,2 Ml 98,00
2.1.8.3 Pekerjaan ijuk dan split M3

2.1.9 PEKERJAAN STRUKTUR AREA DEPAN GSB


2.1.9.1 Pekerjaan perapihan tanah oleh alat berat Ls 0,20
2.1.9.2 Besi tulangan Kg 10.530,00
2.1.9.3 Pekerjaan beton untuk jalan tebal 15 M3 95,00

2.2 SUB PEKERJAAN PANCANG

2.2.1 UMUM
2.2.1.1 Mob & Demob Alat Diesel Hammer Unit -
2.2.1.2 Mob & Demob Crane Service Unit -
2.2.1.3 Handling Material M -

2.2.2 PEKERJAAN TIANG PANCANG


2.2.2.1 PEKERJAAN TIANG PANCANG INDIKATOR PILE ( 40 Titik )
Asumsi kedalaman : 20 M (10+10)
2.2.2.1.1 Tiang Pancang uk. 35 x 35 cm, Presstressed Pile PC 5 Strand 3/8", Mutu BetonMK500 NFA -
2.2.2.1.2 Jasa Pancang Diesel Hammer (Vol. Min. 1000 m) M -
2.2.2.1.3 Joint Plat & Pengelasan Set -

2.2.2.2 PEKERJAAN TIANG PANCANG


Asumsi kedalaman : 14 M (7+7)
2.2.2.2.1 Tiang Pancang uk. 35 x 35 cm, Mutu Beton K500 NFA M -
Tiang Pancang uk. 25 x 25 cm, Mutu bottom M -
Beton K450 NFA middle M -
2.2.2.2.2 Jasa Pancang Diesel Hammer (Vol. Min. 1000 m) M -
Jasa Pancang Diesel Hammer (Vol. Min. 1000 m) M -
Jasa Re-Drive Pancang 35 x 35 Ttk -
2.2.2.2.3 Joint Plat & Pengelasan Bh -
2.2.2.2.4 Dolly M -

2.2.3 PEKERJAAN TEST TIANG PANCANG


2.2.3.1 Mob & Demob Alat Loading Test Unit -
2.2.3.2 Loading Test ttk -
2.2.3.3 PDA dan Axial Test ttk -

2.3 SUB PEKERJAAN STRUKTUR BAWAH


2.3.1 Beton K-350
2.3.1.1 Plat Lt. Basement M3 -
2.3.1.2 Pile Cap M3 -
2.3.1.3 Tie Beam M3 -
2.3.1.4 Pit Lift M3 -
2.3.1.5 Sumpit & greas Trap M3 -
2.3.1.6 STP M3 -
2.3.1.7 Ground Tank M3 -
2.3.1.8 Retaining wall M3 -

2.3.2 Besi BJTD 40 dan BJTD 24


2.3.2.1 Plat Lt. Basement Kg -
2.3.2.2 Pile Cap Kg -
2.3.2.3 Tie Beam Kg -
2.3.2.4 Pit Lift Kg -
2.3.2.5 Sumpit & greas Trap Kg -
2.3.2.6 STP Kg -
2.3.2.7 Ground Tank Kg -
2.3.2.8 Retaining wall Kg -

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN STRUKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 2 : PEKERJAAN STRUKTUR
HALAMAN : 7
HARGA SATUAN (Rp)
HARGA TOTAL
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL (Rp)
UPAH MATERIAL

2.3.3 Bekisting batako


2.3.3.1 Plat Lt. Basement M2 -
2.3.3.2 Pile Cap M2 -
2.3.3.3 Tie Beam M2 -

2.3.4 Bekisting biasa


2.3.4.1 Pit Lift M2 -
2.3.4.2 Sumpit & greas Trap M2 -
2.3.4.3 STP M2 -
2.3.4.4 Ground Tank M2 -
2.3.4.5 Retaining wall M2 -

2.3.5 Pondasi TC
2.3.5.1 Potong/bobok Tiang Pancang ttk -
2.3.5.2 Galian Tanah m3 -
2.3.5.3 Urugan tanah kembali m3 -
2.3.5.4 Urugan Pasir t = 10 cm m3 -
2.3.5.5 Lantai Kerja t = 5 cm m3 -
2.3.5.6 Pasang Bekisting m2 -
2.3.5.7 Besi Beton Kg -
2.3.5.8 Beton K 400 m3 -

2.4 SUB PEKERJAAN STRUKTUR ATAS


2.4.1 Beton K-400 - Kolom
2.4.1.1 Lt. Basement M3 -
2.4.1.2 Lantai 1 M3 -
2.4.1.3 Lantai 2 M3 6,99
2.4.1.4 Lantai 3 M3 5,52
2.4.1.5 Lantai 4 M3 -
2.4.1.6 Lantai 5 M3 -
2.4.1.7 Lantai 6 M3 -
2.4.1.8 Lantai 7 M3 -
2.4.1.9 Lantai 8 M3 -
2.4.1.10 Lantai 9 M3 -
2.4.1.11 Lantai 10 M3 -
2.4.1.12 Lantai 11 M3 -
2.4.1.13 Lantai 12 M3 17,02
2.4.1.14 Lantai 13 M3 17,02
2.4.1.15 Lantai 14 M3 21,01
2.4.1.16 Lantai Atap M3 15,74

2.4.2 Beton K-350 - Plat Lantai


2.4.2.1 Lantai 1 M3 -
2.4.2.2 Lantai 2 M3 23,16
2.4.2.3 Lantai 3 Termasuk Plat atap Oval M3 13,03
2.4.2.4 Lantai 4 M3 -
2.4.2.5 Lantai 5 M3 -
2.4.2.6 Lantai 6 M3 -
2.4.2.7 Lantai 7 M3 -
2.4.2.8 Lantai 8 M3 -
2.4.2.9 Lantai 9 M3 -
2.4.2.10 Lantai 10 M3 -
2.4.2.11 Lantai 11 M3 -
2.4.2.12 Lantai 12 M3 -
2.4.2.13 Lantai 13 M3 77,43
2.4.2.14 Lantai 14 Termasuk Plat Kolam Renang M3 84,52
2.4.2.15 Lantai Atap M3 62,85
2.4.2.16 Lantai Atap Lift + tangga M3 1,99

2.4.3 Beton K-350 - Balok


2.4.3.1 Lantai 1 M3 -
2.4.3.2 Lantai 2 M3 9,34
2.4.3.3 Lantai 3 Termasuk Balok atap Oval M3 1,91
2.4.3.4 Lantai 4 M3 -
2.4.3.5 Lantai 5 M3 -
2.4.3.6 Lantai 6 M3 -
2.4.3.7 Lantai 7 M3 -
2.4.3.8 Lantai 8 M3 -
PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN STRUKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 2 : PEKERJAAN STRUKTUR
HALAMAN : 8
HARGA SATUAN (Rp)
HARGA TOTAL
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL (Rp)
UPAH MATERIAL

2.4.3.9 Lantai 9 M3 -
2.4.3.10 Lantai 10 M3 -
2.4.3.11 Lantai 11 M3 -
2.4.3.12 Lantai 12 M3 -
2.4.3.13 Lantai 13 M3 56,03
2.4.3.14 Lantai 14 M3 84,81
2.4.3.15 Lantai Atap M3 49,32
2.4.3.16 Lantai Atap Lift M3 16,06

2.4.4 Beton K-300 - Tangga


2.4.4.1 Lt. Basement M3 -
2.4.4.2 Lantai 1 M3 -
2.4.4.3 Lantai 2 M3 -
2.4.4.4 Lantai 3 M3 -
2.4.4.5 Lantai 4 M3 -
2.4.4.6 Lantai 5 M3 -
2.4.4.7 Lantai 6 M3 -
2.4.4.8 Lantai 7 M3 -
2.4.4.9 Lantai 8 M3 5,43
2.4.4.10 Lantai 9 M3 5,43
2.4.4.11 Lantai 10 M3 5,43
2.4.4.12 Lantai 11 M3 5,43
2.4.4.13 Lantai 12 M3 5,43
2.4.4.14 Lantai 13 M3 5,43
2.4.4.15 Lantai 14 M3 10,52
2.4.4.16 Lantai Atap M3 10,52

2.4.5 Beton K-400 - Sheer Wall


2.4.5.1 Lt. Basement M3 -
2.4.5.2 Lantai 1 M3 -
2.4.5.3 Lantai 2 M3 -
2.4.5.4 Lantai 3 M3 -
2.4.5.5 Lantai 4 M3 -
2.4.5.6 Lantai 5 M3 -
2.4.5.7 Lantai 6 M3 -
2.4.5.8 Lantai 7 M3 -
2.4.5.9 Lantai 8 M3 -
2.4.5.10 Lantai 9 M3 -
2.4.5.11 Lantai 10 M3 -
2.4.5.12 Lantai 11 M3 -
2.4.5.13 Lantai 12 M3 13,10
2.4.5.14 Lantai 13 M3 13,10
2.4.5.15 Lantai 14 M3 18,65
2.4.5.16 Lantai Atap M3 18,65

2.4.6 Beton K-350 - Ramp ( termasuk balok )


2.4.6.1 Lt. Basement M3 7,97

2.4.7 Beton K-350 - Parapet


2.4.7.1 Lantai Atap Dack Lt.1 M3 138,75
2.4.7.2 Lantai Atap & Tangga M3 48,08

2.4.8 Beton K-350 - Pendestal, dsb


2.4.8.1 Dinding Kolam Renang M3 19,10
2.4.8.2 Pedestal Gondola M3 1,13
2.4.8.3 Pondasi Genset & Pompa M3 8,96
2.4.8.4 Dudukan Roof Tank M3 6,45

PEKERJAAN BESI
2.4.9 Besi BJTD 40 dan BJTD 24 - Kolom
2.4.9.1 Lt. Basement Kg -
2.4.9.2 Lantai 1 Kg -
2.4.9.3 Lantai 2 Kg 1.464,28
2.4.9.4 Lantai 3 Kg 1.079,37
2.4.9.5 Lantai 4 Kg -
2.4.9.6 Lantai 5 Kg -
2.4.9.7 Lantai 6 Kg -
2.4.9.8 Lantai 7 Kg -
2.4.9.9 Lantai 8 Kg -
2.4.9.10 Lantai 9 Kg -
2.4.9.11 Lantai 10 Kg -
2.4.9.12 Lantai 11 Kg -

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN STRUKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 2 : PEKERJAAN STRUKTUR
HALAMAN : 9
HARGA SATUAN (Rp)
HARGA TOTAL
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL (Rp)
UPAH MATERIAL

2.4.9.13 Lantai 12 Kg 1.466,49


2.4.9.14 Lantai 13 Kg 3.132,03
2.4.9.15 Lantai 14 Kg 2.455,35
2.4.9.16 Lantai Atap Kg 941,76

2.4.10 Besi BJTD 40 dan BJTD 24 - Plat Lantai Kg


2.4.10.1 Lantai 1 Kg -
2.4.10.2 Lantai 2 Kg 3.033,11
2.4.10.3 Lantai 3 Termasuk Plat atap Oval Kg 1.695,96
2.4.10.4 Lantai 4 Kg -
2.4.10.5 Lantai 5 Kg -
2.4.10.6 Lantai 6 Kg -
2.4.10.7 Lantai 7 Kg -
2.4.10.8 Lantai 8 Kg -
2.4.10.9 Lantai 9 Kg -
2.4.10.10 Lantai 10 Kg -
2.4.10.11 Lantai 11 Kg -
2.4.10.12 Lantai 12 Kg -
2.4.10.13 Lantai 13 Kg 10.900,53
2.4.10.14 Lantai 14 Termasuk Plat Kolam Renang Kg 14.396,38
2.4.10.15 Lantai Atap Kg 8.600,57
2.4.10.16 Lantai Atap Lift Kg 167,79

2.4.11 Besi BJTD 40 dan BJTD 24 - Balok


2.4.11.1 Lantai 1 Kg -
2.4.11.2 Lantai 2 Kg 1.487,83
2.4.11.3 Lantai 3 Termasuk Balok atap Oval Kg 304,82
2.4.11.4 Lantai 4 Kg -
2.4.11.5 Lantai 5 Kg -
2.4.11.6 Lantai 6 Kg -
2.4.11.7 Lantai 7 Kg -
2.4.11.8 Lantai 8 Kg -
2.4.11.9 Lantai 9 Kg -
2.4.11.10 Lantai 10 Kg -
2.4.11.11 Lantai 11 Kg -
2.4.11.12 Lantai 12 Kg -
2.4.11.13 Lantai 13 Kg 7.502,31
2.4.11.14 Lantai 14 Kg 8.195,28
2.4.11.15 Lantai Atap Kg 6.788,29
2.4.11.16 Lantai Atap Lift Kg 2.381,97

2.4.12 Besi BJTD 40 dan BJTD 24 - Tangga


2.4.12.1 Lt. Basement Kg -
2.4.12.2 Lantai 1 Kg -
2.4.12.3 Lantai 2 Kg -
2.4.12.4 Lantai 3 Kg -
2.4.12.5 Lantai 4 Kg -
2.4.12.6 Lantai 5 Kg -
2.4.12.7 Lantai 6 Kg -
2.4.12.8 Lantai 7 Kg -
2.4.12.9 Lantai 8 Kg 1.067,63
2.4.12.10 Lantai 9 Kg 1.067,63
2.4.12.11 Lantai 10 Kg 1.067,63
2.4.12.12 Lantai 11 Kg 1.067,63
2.4.12.13 Lantai 12 Kg 1.067,63
2.4.12.14 Lantai 13 Kg 1.067,63
2.4.12.15 Lantai 14 Kg 2.063,47
2.4.12.16 Lantai Atap Kg 2.063,47

2.4.13 Besi BJTD 40 dan BJTD 24 - Sheer Wall


2.4.13.1 Lt. Basement Kg -
2.4.13.2 Lantai 1 Kg -
2.4.13.3 Lantai 2 Kg -
2.4.13.4 Lantai 3 Kg -
2.4.13.5 Lantai 4 Kg -
2.4.13.6 Lantai 5 Kg -
2.4.13.7 Lantai 6 Kg -
2.4.13.8 Lantai 7 Kg -
2.4.13.9 Lantai 8 Kg -
2.4.13.10 Lantai 9 Kg -
2.4.13.11 Lantai 10 Kg -
2.4.13.12 Lantai 11 Kg -
2.4.13.13 Lantai 12 Kg 773,98
2.4.13.14 Lantai 13 Kg 773,98
PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN STRUKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 2 : PEKERJAAN STRUKTUR
HALAMAN : 10
HARGA SATUAN (Rp)
HARGA TOTAL
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL (Rp)
UPAH MATERIAL

2.4.13.15 Lantai 14 Kg 1.070,38


2.4.13.16 Lantai Atap Kg 1.070,38

2.4.14 Besi BJTD 40 dan BJTD 24 - Ramp ( Incl. Balok )


2.4.14.1 Lt. Basement Kg 1.347,60

2.4.15 Besi BJTD 40 dan BJTD 24 - Parapet


2.4.15.1 Lantai Atap dack Lt.1 Kg 16.649,74
2.4.15.2 Lantai Atap & tangga Kg 5.769,79

2.4.16 Besi BJTD 40 dan BJTD 24 - Pedestal, dsb


2.4.16.1 Dinding Kolam Renang Kg 2.406,02
2.4.16.2 Pedestal Gondola Kg 591,36
2.4.16.3 Pondasi Genset & Pompa Kg 966,00
2.4.16.4 Dudukan Roof Tank Kg 806,40

2.4.17 Wire Mesh M8 Lantai 1 M2 -

Wire Mesh M7 - Plat atap Diamond


2.4.18 Lantai Atap M2 160,96
T.2

2.4.19 Bekisting biasa - Kolom


2.4.19.1 Lt. Basement M2 -
2.4.19.2 Lantai 1 M2 -
2.4.19.3 Lantai 2 M2 41,64
2.4.19.4 Lantai 3 M2 33,31
2.4.19.5 Lantai 4 M2 -
2.4.19.6 Lantai 5 M2 -
2.4.19.7 Lantai 6 M2 -
2.4.19.8 Lantai 7 M2 -
2.4.19.9 Lantai 8 M2 -
2.4.19.10 Lantai 9 M2 -
2.4.19.11 Lantai 10 M2 -
2.4.19.12 Lantai 11 M2 -
2.4.19.13 Lantai 12 M2 125,38
2.4.19.14 Lantai 13 M2 125,38
2.4.19.15 Lantai 14 M2 125,38
2.4.19.16 Lantai Atap M2 125,38

2.4.20 Bekisting biasa - Plat Lantai Lt. Basement M2


2.4.20.1 Lantai 1 M2 -
2.4.20.2 Lantai 2 M2 127,98
2.4.20.3 Lantai 3 Termasuk Plat atap Oval M2 83,96
2.4.20.4 Lantai 4 M2 -
2.4.20.5 Lantai 5 M2 -
2.4.20.6 Lantai 6 M2 -
2.4.20.7 Lantai 7 M2 -
2.4.20.8 Lantai 8 M2 -
2.4.20.9 Lantai 9 M2 -
2.4.20.10 Lantai 10 M2 -
2.4.20.11 Lantai 11 M2 -
2.4.20.12 Lantai 12 M2 -
2.4.20.13 Lantai 13 M2 447,34
2.4.20.14 Lantai 14 Termasuk Plat Kolam Renang M2 436,61
2.4.20.15 Lantai Atap M2 222,25
2.4.20.16 Lantai Atap Lift M2 123,48

2.4.21 Bekisting biasa - Balok Lt. Basement M2


2.4.21.1 Lantai 1 M2 -
2.4.21.2 Lantai 2 M2 57,80
2.4.21.3 Lantai 3 Termasuk Balok atap Oval M2 27,41
2.4.21.4 Lantai 4 M2 -
2.4.21.5 Lantai 5 M2 -
2.4.21.6 Lantai 6 M2 -
2.4.21.7 Lantai 7 M2 -
2.4.21.8 Lantai 8 M2 -
2.4.21.9 Lantai 9 M2 -
2.4.21.10 Lantai 10 M2 -
2.4.21.11 Lantai 11 M2 -
2.4.21.12 Lantai 12 M2 -
2.4.21.13 Lantai 13 M2 481,04

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN STRUKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 2 : PEKERJAAN STRUKTUR
HALAMAN : 11
HARGA SATUAN (Rp)
HARGA TOTAL
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL (Rp)
UPAH MATERIAL

2.4.21.14 Lantai 14 M2 534,23


2.4.21.15 Lantai Atap M2 370,38
2.4.21.16 Lantai Atap Lift M2 110,78

2.4.22 Bekisting biasa - Tangga


2.4.22.1 Lt. Basement M2 -
2.4.22.2 Lantai 1 M2 -
2.4.22.3 Lantai 2 M2 -
2.4.22.4 Lantai 3 M2 -
2.4.22.5 Lantai 4 M2 -
2.4.22.6 Lantai 5 M2 -
2.4.22.7 Lantai 6 M2 -
2.4.22.8 Lantai 7 M2 -
2.4.22.9 Lantai 8 M2 58,65
2.4.22.10 Lantai 9 M2 58,65
2.4.22.11 Lantai 10 M2 58,65
2.4.22.12 Lantai 11 M2 58,65
2.4.22.13 Lantai 12 M2 58,65
2.4.22.14 Lantai 13 M2 58,65
2.4.22.15 Lantai 14 M2 58,65
2.4.22.16 Lantai Atap M2 18,36

2.4.23 Bekisting biasa - Sheer Wall


2.4.23.1 Lt. Basement M2 -
2.4.23.2 Lantai 1 M2 -
2.4.23.3 Lantai 2 M2 -
2.4.23.4 Lantai 3 M2 -
2.4.23.5 Lantai 4 M2 -
2.4.23.6 Lantai 5 M2 -
2.4.23.7 Lantai 6 M2 -
2.4.23.8 Lantai 7 M2 -
2.4.23.9 Lantai 8 M2 -
2.4.23.10 Lantai 9 M2 -
2.4.23.11 Lantai 10 M2 -
2.4.23.12 Lantai 11 M2 -
2.4.23.13 Lantai 12 M2 113,28
2.4.23.14 Lantai 13 M2 113,28
2.4.23.15 Lantai 14 M2 113,28
2.4.23.16 Lantai Atap M2 113,28

2.4.24 Bekisting biasa - Ramp ( termasuk Balok )


2.4.24.1 Lt. Basement M2 38,49

2.4.25 Bekisting biasa - Parapet


2.4.25.1 Lantai Atap dack Lt.1 M2 1.109,98
2.4.25.2 Lantai Atap & tangga M2 384,65

2.4.26 Bekisting biasa - Pedestal, dsb


2.4.26.1 Lantai 1 Dinding Kolam Renang M2 -
2.4.26.2 Lantai Atap Pedestal Gondola M2 21,50
2.4.26.3 Lantai 1 Pondasi Genset & Pompa M2 14,34
2.4.26.4 Lantai Atap Dudukan Roof Tank M2 24,86

2.5 SUB PEKERJAAN STRUKTUR GONDOLA DAN TOPI


2.5.1 Pekerjaan kolom struktur 30x60
2.5.1.1 Lantai 14 Pekerjaan beton M3 14,40
2.5.1.2 Lantai 14 Pekerjaan Besi Kg 3.600,00
2.5.1.3 Lantai 14 Pekerjaan bekisting M2 160,00

2.5.2 Pekerjaan Balok struktur 30x60


2.5.2.1 Lantai atap dan topi Pekerjaan beton M3 29,33
2.5.2.2 Lantai atap dan topi Pekerjaan Besi Kg 5.866,00
2.5.2.3 Lantai atap dan topi Pekerjaan bekisting M2 244,41

2.5.3 Pekerjaan plat 20 sd 40


2.5.3.1 Lantai topi Pekerjaan beton M3 22,85
2.5.3.2 Lantai topi Pekerjaan Besi Kg 4.113,00
2.5.3.3 Lantai topi Pekerjaan bekisting M2 228,50

2.5.4 Pekerjaan perkuatan plat jd balok tidur


PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN STRUKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 2 : PEKERJAAN STRUKTUR
HALAMAN : 12
HARGA SATUAN (Rp)
HARGA TOTAL
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL (Rp)
UPAH MATERIAL

2.5.4.1 Lantai atap lift Pekerjaan beton M3 12,00


2.5.4.2 Lantai atap lift Pekerjaan Besi Kg 2.400,00

2.5.5 Pekerjaan angkur dia 22 Bh 212,00


2.5.6 Pekerjaan alat bantu dan perapihan topi Ls 1,00

2.6 SUB PEKERJAAN KOLAM RENANG


2.6.1 Lantai 1
2.6.1.1 Pekerjaan Pas hebel 7cm untuk dudukan plat M2 -
2.6.1.2 Pekerjaan kolom praktis 14x14 M3 0,31
2.6.1.3 Pekerjaan balok latei untuk lantai M3 -
2.6.1.4 Pekerjaan plesteran & untuk pas hebel M2 -
2.6.1.5 Pekerjaan guter untuk kolam renang M3 -

2.6.2 Lantai 14
2.6.2.1 Pekerjaan Pas hebel 7cm untuk dudukan plat M2 66,00
2.6.2.2 Pekerjaan kolom praktis 14x14 M3 0,74
2.6.2.3 Pekerjaan balok latei untuk lantai M3 1,00
2.6.2.4 Pekerjaan plesteran & untuk pas hebel M2 132,00
2.6.2.5 Pekerjaan guter untuk kolam renang M3 15,00

2.6.3 Peninggian lantai perapet


2.6.3.1 Pekerjaan Pas hebel 7cm untuk dudukan plat M2 -
2.6.3.2 Pekerjaan kolom praktis 14x14 M3 -
2.6.3.3 Pekerjaan balok latei untuk lantai M3 -
2.6.3.4 Pekerjaan plesteran & untuk pas hebel M2

2.7 SUB PEKERJAAN ATAP

2.7.1 RANGKA BAJA STRUKTURAL LANTAI 1


2.7.1.1 Baja WF 250x125x6x9 mm Kg 4.490,34
2.7.1.2 Plat tb 10mm Kg 508,31
Pipa struktur diameter 5 inchi
2.7.1.3 M 40,00
termasuk finish cat
Base plate tb 10 mm termasuk
2.7.1.4 M2 1,20
grouting dan pelubangan
2.7.1.5 Angkur dan baut diameter 16 mm Bh 180,00
2.7.1.6 Cat zinchromate Kg 4.998,65
2.7.1.7 Cat minyak Kg 4.998,65

2.7.2 RANGKA BAJA STRUKTURAL LANTAI 3


2.7.2.1 Baja WF 250x125x6x9 mm Kg 3.544,01
2.7.2.2 Plat tb 10mm Kg 389,84
2.7.2.3 Bracing diameter 19 mm Kg 142,46
2.7.2.4 Turn buckle Bh 10,00
Base plate tb 10 mm termasuk
2.7.2.5 M2 2,94
grouting dan pelubangan
2.7.2.6 Angkur dan baut diameter 16 mm Bh 108,00
2.7.2.7 Cat zinchromate Kg 4.076,31
2.7.2.8 Cat minyak Kg 4.076,31

2.7.3 RANGKA BAJA STRUKTURAL LANTAI ATAP


2.7.3.1 Baja WF 250x125x6x9 mm Kg 2.083,84
2.7.3.2 Plat tb 10mm Kg 229,22
Pipa struktur diameter 5 inchi
2.7.3.3 M 22,32
termasuk finish cat
Base plate tb 10 mm termasuk
2.7.3.4 M2 1,98
grouting dan pelubangan
2.7.3.5 Angkur dan baut diameter 16 mm Bh 300,00
2.7.3.6 Cat zinchromate Kg 2.313,06
2.7.3.7 Cat minyak Kg 2.313,06

2.8 SUB PEKERJAAN LAIN - LAIN


2.8.1 Waterstop
2.8.1.1 Retaining Wall M -
2.8.1.2 Pit Lift M -
2.8.1.3 Sumpit M -
PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN STRUKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 2 : PEKERJAAN STRUKTUR
HALAMAN : 13
HARGA SATUAN (Rp)
HARGA TOTAL
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL (Rp)
UPAH MATERIAL

2.8.1.4 STP & Greas Trap M -


2.8.1.5 Ground Tank M -

Extra pembuatan alur ramp


2.8.2 Lt. Basement ukuran 50x20mm termasuk M2 44,00
perapihan

Extra gutter ukuran 200x100mm


2.8.3 Lt. Basement M 4,31
termasuk perapihan pada ramp

2.8.4 Extra gutter ukuran 150x50mm termasuk perapihan - Parkir keliling


2.8.4.1 Lt. Basement M 272,28
2.8.4.2 Lantai 1 M 462,49
2.8.4.3 Lantai Atap Tower 1 M 160,27
2.8.4.4 Lantai Atap Tower 2 M 48,16

2.8.5 Waterproofing Semen Base


2.8.5.1 Lantai 1 dak terbuka M2 3.387,85
2.8.5.2 Lantai Atap M2 375,76
2.8.5.3 Lantai Atap Tangga & R. Mesin Lift. M2 191,23
2.8.5.4 Talang Beton atap T.2 M2 107,52

Waterproofing coating system


2.8.6 termasuk screed pelindung tebal 3 Guter Ramp M2 21,53
cm

2.8.7 Floor hardener 5kg/m2 trowel finish natural


2.8.7.1 Lt. Basement M2 2.535,81
2.8.7.2 Lantai 1 Area Sirkulasi , parkir & Ramp M2 1.061,31
2.8.7.3 Lantai Atap Jalur Gondola M2 207,22

2.8.8 Floor hardener 3kg/m2 trowel finish natural


2.8.8.1 Lt. Basement 1 M2 35,30
2.8.8.2 Lantai 1 R.Genset , Trafo & R. ME M2 110,01
2.8.8.3 Lantai Atap R. Mesin Lift M2 99,02

2.8.9 Pekerjaan Chemical anchor


2.8.9.1 Diameter 10 ttk -
2.8.9.2 Diameter13 ttk -
2.8.9.3 Diameter 16 ttk -
2.8.9.4 Diameter 22 ttk 14,00

REKAPITULASI TOTAL PENJUMLAHAN SUB PEKERJAAN STRUKTUR

2.1 SUB TOTAL PEKERJAAN PEMATANGAN LAHAN

2.2 SUB TOTAL PEKERJAAN PANCANG

2.3 SUB TOTAL PEKERJAAN STRUKTUR BAWAH

2.4 SUB TOTAL PEKERJAAN STRUKTUR ATAS

2.5 SUB TOTAL PEKERJAAN STRUKTUR GONDOLA DAN TOPI

2.6 SUB TOTAL PEKERJAAN KOLAM RENANG

2.7 SUB TOTAL PEKERJAAN ATAP

2.8 SUB TOTAL PEKERJAAN LAIN - LAIN

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN STRUKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 14
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

3 PEKERJAAN ARSITEKTUR

3.1 SUB PEKERJAAN DINDING

3.1.1 PUBLIK AREA & HOTEL

3.1.1.1 PEKERJAAN DINDING BATA RINGAN


Bata ringan tebal 100mm dengan adukan drymix system
3.1.1.1.1 Pada dinding dalam
(Vol.kolom & balok praktis terpisah)
3.1.1.1.1.1 Lt. Basement M2 64,70
3.1.1.1.1.2 Lantai 1 M2 72,76
3.1.1.1.1.3 Lantai 2 M2 61,86
3.1.1.1.1.4 Lantai 3 M2 46,92
3.1.1.1.1.5 Lantai 4 M2 62,40
3.1.1.1.1.6 Lantai 5 M2 62,40
3.1.1.1.1.7 Lantai 6 M2 550,00
3.1.1.1.1.8 Lantai 7 M2 550,00
3.1.1.1.1.9 Lantai 8 M2 550,00
3.1.1.1.1.10 Lantai 9 M2 550,00
3.1.1.1.1.11 Lantai 10 M2 550,00
3.1.1.1.1.12 Lantai 11 M2 550,00
3.1.1.1.1.13 Lantai 12 M2 261,71
3.1.1.1.1.14 Lantai 13 M2 261,71
3.1.1.1.1.15 Lantai 14 M2 254,95
3.1.1.1.1.16 Lantai Atap M2 175,50

Bata ringan tebal 100mm dengan adukan drymix system


3.1.1.1.2 Pada dinding Toilet
(Vol.kolom & balok praktis terpisah)
3.1.1.1.2.1 Lt. Basement M2 0,00
3.1.1.1.2.2 Lantai 1 M2 0,00
3.1.1.1.2.3 Lantai 2 M2 0,00
3.1.1.1.2.4 Lantai 3 M2 0,00
3.1.1.1.2.5 Lantai 4 M2 6,40
3.1.1.1.2.6 Lantai 5 M2 6,40
3.1.1.1.2.7 Lantai 6 M2 117,00
3.1.1.1.2.8 Lantai 7 M2 117,00
3.1.1.1.2.9 Lantai 8 M2 117,00
3.1.1.1.2.10 Lantai 9 M2 117,00
3.1.1.1.2.11 Lantai 10 M2 117,00
3.1.1.1.2.12 Lantai 11 M2 117,00
3.1.1.1.2.13 Lantai 12 M2 253,46
3.1.1.1.2.14 Lantai 13 M2 253,46
3.1.1.1.2.15 Lantai 14 M2 140,48

SUB TOTAL PEKERJAAN DINDING Rp.

3.2 SUB PEKERJAAN PLESTERAN DAN ACIAN

3.2.1 PUBLIK AREA & HOTEL

3.2.1.1 PEKERJAAN PLESTERAN DAN ACIAN

3.2.1.1.1 Plesteran termasuk acian dengan adukan drymix system Pada dinding dalam
3.2.1.1.1.1 Lt. Basement M2 1.074,25
3.2.1.1.1.2 Lantai 1 M2 631,60
3.2.1.1.1.3 Lantai 2 M2 388,33
3.2.1.1.1.4 Lantai 3 M2 180,47
3.2.1.1.1.5 Lantai 4 M2 555,03
3.2.1.1.1.6 Lantai 5 M2 641,80
3.2.1.1.1.7 Lantai 6 M2 740,04
3.2.1.1.1.8 Lantai 7 M2 656,65
3.2.1.1.1.9 Lantai 8 M2 697,89
3.2.1.1.1.10 Lantai 9 M2 646,65
3.2.1.1.1.11 Lantai 10 M2 740,04
3.2.1.1.1.12 Lantai 11 M2 855,73
3.2.1.1.1.13 Lantai 12 M2 667,99
3.2.1.1.1.14 Lantai 13 M2 666,04

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 15
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.2.1.1.1.15 Lantai 14 M2 500,00
3.2.1.1.1.16 Lantai Atap M2 128,20

3.2.1.1.2 Plesteran termasuk acian dengan adukan drymix system kamar mandi tanpa acian
3.2.1.1.2.1 Lt. Basement M2 518,24
3.2.1.1.2.2 Lantai 1 M2 102,63
3.2.1.1.2.3 Lantai 2 M2 69,94
3.2.1.1.2.4 Lantai 3 M2 69,00
3.2.1.1.2.5 Lantai 4 M2 219,38
3.2.1.1.2.6 Lantai 5 M2 234,00
3.2.1.1.2.7 Lantai 6 M2 234,00
3.2.1.1.2.8 Lantai 7 M2 234,00
3.2.1.1.2.9 Lantai 8 M2 234,00
3.2.1.1.2.10 Lantai 9 M2 234,00
3.2.1.1.2.11 Lantai 10 M2 234,00
3.2.1.1.2.12 Lantai 11 M2 234,00
3.2.1.1.2.13 Lantai 12 M2 506,92
3.2.1.1.2.14 Lantai 13 M2 506,92
3.2.1.1.2.15 Lantai 14 M2 280,96

SUB TOTAL PEKERJAAN PLESTERAN + ACIAN Rp.

3.3 SUB PEKERJAAN TAMPAK LUAR ( FAÇADE )

3.3.1 TAMPAK LUAR ( FAÇADE ) TOWER 1


Alumunium Composite Panel termasuk rangka, sealant,
3.3.1 M2 3.544,25
accessories, dan perlengkapan lainnya.

3.4 SUB PEKERJAAN SCREEDING DI DALAM

3.4.1 DI DALAM
3.4.1.1 Lt. Basement M2 1.002,79
3.4.1.2 Lantai 1 M2 669,85
3.4.1.3 Lantai 2 M2 514,35
3.4.1.4 Lantai 3 M2 503,04
3.4.1.5 Lantai 4 M2 454,86
3.4.1.6 Lantai 5 M2 454,86
3.4.1.7 Lantai 6 M2 454,86
3.4.1.8 Lantai 7 M2 454,86
3.4.1.9 Lantai 8 M2 454,86
3.4.1.10 Lantai 9 M2 454,86
3.4.1.11 Lantai 10 M2 454,86
3.4.1.12 Lantai 11 M2 454,86
3.4.1.13 Lantai 12 M2 454,86
3.4.1.14 Lantai 13 M2 454,86
3.4.1.15 Lantai 14 M2 325,82

3.5 SUB PEKERJAAN DI LUAR BANGUNAN

3.5.1 Tampak Kiri


3.5.1.1 Pekerjaan pias untuk area outdoor teras tampak kiri m' 72,00
3.5.1.2 Pekerjaan portal enrtance beton tampak kiri &dpn m' 38,00
3.5.1.3 Pekerjaan profilan beton pada topi outdoor teras tampak kiri m' 32,00
3.5.1.4 Precast Planter Box pada daerah entrance tampak kiri m2 75,00
3.5.1.5 Pekerjaan prtofilan lisplank di area entrance tampak kiri m' 35,00
Pekerjaan profilan kolom mahkota untuk enrance (
3.5.1.6 tampak kiri bh 4,00
kolom pakai ht)
3.5.1.7 Konstruksi Bak Bunga termasuk Out door Terras tampak kiri
3.5.1.7.1 Beton K-225 m3 5,85

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 16
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.5.1.7.2 Bekisting biasa m2 58,27
3.5.1.7.3 Besi BJTD 40 dan BJTD 24 kg 702,24
Waterproofing membrane system tebal 3 mm dengan
3.5.1.7.4 tampak kiri m2 174,81
screed tebal 3 cm
3.5.1.8 Pekerjaan lisplank beton tampak kiri m' 58,50
Batu Andesite sebagai Toping dengan lebar 20 cm tebal
3.5.1.9 Bak Bunga m2 58,70
5 cm termasuk adukan
3.5.1.10 Pekerjaan Screeding pada area teras tampak kiri m2 123,00
Dinding bata ringan tebal 100mm dengan adukan drymix Parapet Out door
3.5.1.11 m2 58,50
system termasuk kolom & balok praktis terras
Parapet Out door
3.5.1.12 Plesteran termasuk acian dengan adukan drymix system m2 117,00
terras

3.5.2 Tampak Kanan


Pekerjaan pias terbuat dr profilan pada area kamar
3.5.2.1 tampak kanan m' 245,00
mandi
3.5.2.2 Konstruksi Waterfeature tampak kanan
3.5.2.2.1 Beton K-225 m3 7,87
3.5.2.2.2 Bekisting biasa m2 78,67
3.5.2.2.3 Besi BJTD 40 dan BJTD 24 kg 944,06
3.5.2.2.4 Pekerjaan screeding pada daerah kolam dan teras tampak kanan m2 132,00
3.5.2.2.5 Waterproofing spray penetron Waterfeature m2 206,61
Concrete Bance tinggi 500 mm x 500 mm lebar dengan
finish skim coat, dan sandaran Railling pipa galvanis
3.5.2.3 tampak kanan m 36,00
diametr 2,5 inchi , di bawah bence terdapat T5 indirect
lamp termasuk dudukan dan perlengkapan lainnya.
3.5.2.4 Jembatan beton water feature m 9,60

3.5.3 Tampak Depan


Pekerjaan dowel pada sambungan antara tower dan luar
3.5.3.1 tampak depan ml 5,20
bangunan
Pekerjaan sub base pondasi dan base course jalan pada
3.5.3.2 tampak depan m2 41,20
entrance dan areal teras
3.5.3.3 Pekerjaan pemadatan tampak depan m2 41,20
3.5.3.4 Pekerjaan signage 0,00
3.5.3.4.1 Pekerjaan pondasi signage tampak depan m3 2,63
3.5.3.4.2 Pekerjaan pasangan bata 1 batu tampak depan m2 10,50
3.5.3.4.3 Pekerjaan plesteran tampak depan m2 25,00
3.5.3.5 Pekerjaan screeding pada area teras samping tampak depan m2 110,00
3.5.3.6 Pekerjaan screeding pada area teras belakang tampak belakang m2 108,00

3.5.4 Pekerjaan kolam renang


3.5.4.1 Pekerjaan plesteran pd dinding kolam renang kolam renang m2 75,40
3.5.4.2 Pekerjaan screeding pada lantai kolam renang kolam renang m2 200,00
3.5.4.3 Pekerjaan screeding pada lantai pool deck kolam renang m2 185,00
3.5.4.4 Pekerjaan tanggulan pada areal di bawah pool deck kolam renang m' 45,00
3.5.4.5 Pekerjaan tutup kolom bo untuk tutup stek parkir belakang m3 0,00
3.5.4.6 Pekerjaan pias 15x15 m' 270,00

3.5.5 Pekerjaan lift belakang 0,00


3.5.5.1 Pekerjaan atap pada daerah void belakang m3 11,68
3.5.5.2 Pekerjaan perapet pada daerah void belakang m2 12,00
3.5.5.3 Pekerjaan finishing listplank pada perapet belakang m 45,00

3.5.6 Ruang Bilas


3.5.6.1 Pekerjaan lantai beton untuk dak atap ruang bilas kolam renang m3 6,95
3.5.6.2 Pekerjaan kolom beton untuk dak ruang bilas kolam renang m3 1,72
3.5.6.3 Pekerjaan pasangan bata kolam renang m2 72,00
3.5.6.4 Pekerjaan plesteran kolam renang m2 144,00
3.5.6.5 Pekerjaan profilan lisplank beton kolam renang m2 22,00

3.5.7 Pekerjaan tutup pada area tangga dekat stp


3.5.7.1 Pekerjaan perapet pasangan bata m2 11,00
3.5.7.2 Pekerjaan atap m3 3,75
3.5.7.3 Pekerjaan pias m' 99,00

3.5.8 Finishing Jalan Entrance


3.5.8.1 Asphalt Concrete ( Hotmix ) tebal 3 cm Area Depan m2 1.075,00
Kanstin beton ukuran 150x200x400 mm termasuk
3.5.8.2 drive way m' 374,00
angkur dan perapihan
3.5.9 Gardu Jaga Unit 2,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 17
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.5.10 Bangunan trafo dan ruang genset. ME area
3.5.10.1 Pekerjaan pasangan bata termasuk kolom praktis me m2 0,00
3.5.10.2 waterproofing pada atap me me m2 145,00
3.5.10.3 Pekerjaan plesteran dan acian me m2 364,00

3.6 SUB PEKERJAAN PINTU & JENDELA

3.6.1 PEKERJAAN PINTU & JENDELA PUBLIC AREA

3.6.1.1 PINTU KAYU

Pintu kayu single Solid Tora Tora ukuran 1000x2200mm


3.6.1.1.1
dengan kusen kayu ukuran 50/150mm
3.6.1.1.1.1 Pada Pintu Type P- 01 unit 4,00

3.6.1.1.1.2 Kunci & Accessories : Pintu Type P- 01 Set 4,00


- lever Handle DKS LHTR 004 SSS Dekkson Set
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL60MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 288 Dekkson ps
- Door Closer DKS DCL 300 NHO NA Dekkson Set

Pintu kayu single Solid Tora Tora ukuran 1000x2200mm


3.6.1.1.2
dengan kusen kayu ukuran 50/150mm
3.6.1.1.2.1 Pada Pintu Type P- 01 A unit 14,00

3.6.1.1.2.2 Kunci & Accessories : Pintu Type P- 01 A Set 14,00


- lever Handle DKS LHTR 004 SSS Dekkson Set
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL60MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 288 Dekkson ps
- Door Closer DKS DCL 300 NHO NA Dekkson Set

Pintu kayu single Solid Tora Tora ukuran 800x2200mm


3.6.1.1.3
dengan kusen kayu ukuran 50/150mm
3.6.1.1.3.1 Pada Pintu Type P- 02 ( Toilet ) unit 13,00

3.6.1.1.3.2 Kunci & Accessories : Pintu Type P- 02 Set 13,00


- lever Handle DKS LHTR 004 SSS Dekkson Set
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS BK DL60MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 288 Dekkson Set
- Door Stoper DKS DS 001 SSS Dekkson bh

Pintu kayu single Solid Tora Tora ukuran 900x2200mm


3.6.1.1.4
dengan kusen kayu ukuran 50/150mm
3.6.1.1.4.1 Pada Pintu Type P-03 unit 10,00

3.6.1.1.4.2 Kunci & Accessories : Pintu Type P-03 Set 10,00


- lever Handle DKS LHTR 004 SSS Dekkson Set
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL60MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 288 Dekkson ps
- Door Closer DKS DCL 300 NHO NA Dekkson Set

Pintu kayu double Solid Tora Tora ukuran


3.6.1.1.5
1700x2200mm dengan kusen kayu ukuran 50/150mm
3.6.1.1.5.1 Pada Pintu Type P-04 unit 13,00

3.6.1.1.5.2 Kunci & Accessories : Pintu Type P-04 Set 13,00


- lever Handle DKS LHTR 004 SSS Dekkson Set
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 18
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
- Cylinder DKS DC DL60MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 288 Dekkson ps
- Door Closer DKS DCL 300 NHO NA Dekkson Set
- Flush Bolt : DKS FB 040 8+12" SSS Dekkson ps

Pintu kayu double Solid Tora Tora ukuran


3.6.1.1.6
1700x2200mm dengan kusen kayu ukuran 50/150mm
3.6.1.1.6.1 Pada Pintu Type P-04 A unit 1,00

3.6.1.1.6.2 Kunci & Accessories : Pintu Type P-04 A Set 1,00


- lever Handle DKS LHTR 004 SSS Dekkson Set
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL60MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 288 Dekkson ps
- Door Closer DKS DCL 300 NHO NA Dekkson Set
- Flush Bolt : DKS FB 040 8+12" SSS Dekkson ps

Pintu kayu double Solid Tora Tora ukuran


3.6.1.1.7
1700x2350mm dengan kusen kayu ukuran 50/150mm
3.6.1.1.7.1 Pada Pintu Type P-04 B unit 5,00

3.6.1.1.7.2 Kunci & Accessories : Pintu Type P-04 B Set 5,00


- lever Handle DKS LHTR 004 SSS Dekkson Set
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL60MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 288 Dekkson ps
- Door Closer DKS DCL 300 NHO NA Dekkson Set
- Flush Bolt : DKS FB 040 8+12" SSS Dekkson ps

Pintu kayu single Solid Tora Tora ukuran 1200x2200mm


3.6.1.1.8
dengan kusen kayu ukuran 50/150mm
3.6.1.1.8.1 Pada Pintu Type P05 unit 1,00

3.6.1.1.8.2 Kunci & Accessories : Pintu Type P05 Set 1,00


- lever Handle DKS LHTR 004 SSS Dekkson Set
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL60MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 288 Dekkson ps
- Door Closer DKS DCL 300 NHO NA Dekkson Set

Pintu kayu double Solid Tora Tora ukuran 650x1300mm


3.6.1.1.9
dengan kusen kayu kamper ukuran 50/150mm
3.6.1.1.9.1 Pada Pintu Type PS- 01 unit 41,00

3.6.1.1.9.2 Kunci & Accessories : Pintu Type PS-01 Set 41,00


- Pull Plate DKS PP 009 SSS Dekkson ps
- Hinge DKS ESS DL4x3x3mm 288 Dekkson ps
- Window Bolt With Key SSS Dekkson bh

3.6.1.2 PINTU BESI

Pintu besi single ukuran 1200x2200mm, termasuk kunci


3.6.1.2.1 (anti panic ), accessories, finishing cat ducco dan
perlengkapan lainnya
3.6.1.2.1.1 Pada Pintu Type PE-01 ( Tangga darurat ) unit 35,00

3.6.1.2.1.2 Kunci & Accessories : Pintu Type PE-01 unit 35,00


- Panic Device Palmo Iseo 949000050379+MTS Iseo Set
- Lever Handle Iseo LHCR Curva 22MM SSS Iseo Set
- Cylinder Iseo DC F6 80MM SSS Iseo bh
- Hinge DKS DL 4.5x4x3MM 2BB SSS Dekkson ps
- Door Closer DKS DCL 105 NHO NA Dekkson Set

Pintu besi double ukuran 1500x2200mm, termasuk


3.6.1.2.2 kunci, accessories, finishing cat ducco dan
perlengkapan lainnya
3.6.1.2.2.1 Pada Pintu Type PE-02 unit 4,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 19
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.6.1.2.2.2 Kunci & Accessories : Pintu Type PE-02 unit 4,00
- Lever Handle DKS LHTR 016 22MM SSS Dekkson ps
- Mortise DKS DC IL DL8672 SSS Dekkson bh
- Cylinder DKS DC DL 70MM SN Dekkson bh
- Hinge DKS DL 4.5x4x3MM 2BB SSS Dekkson ps
- Flush Bolt DKS FB SQ 501 270MM ZC Dekkson bh
- Flush Bolt DKS FB SQ 501 370MM ZC Dekkson bh

Pintu besi single ukuran 1000x2200mm, termasuk


3.6.1.2.3 kunci, accessories, finishing cat ducco dan
perlengkapan lainnya
3.6.1.2.3.1 Pada Pintu Type PE-03 unit 2,00

3.6.1.2.3.2 Kunci & Accessories : Pintu Type PE-03 unit 2,00


- Lever Handle DKS LHTR 016 22MM SSS Dekkson ps
- Mortise DKS DC IL DL8672 SSS Dekkson bh
- Cylinder DKS DC DL 70MM SN Dekkson bh
- Hinge DKS DL 4.5x4x3MM 2BB SSS Dekkson ps

Pintu besi double ukuran 2100x2200mm, termasuk


3.6.1.2.4 kunci, accessories, finishing cat ducco dan
perlengkapan lainnya
3.6.1.2.4.1 Pada Pintu Type PE-04 unit 17,00

3.6.1.2.4.2 Kunci & Accessories : Pintu Type PE-04 unit 17,00


- Lever Handle DKS LHTR 016 22MM SSS Dekkson ps
- Mortise DKS DC IL DL8672 SSS Dekkson bh
- Cylinder DKS DC DL 70MM SN Dekkson bh
- Hinge DKS DL 4.5x4x3MM 2BB SSS Dekkson ps
- Flush Bolt DKS FB SQ 501 270MM ZC Dekkson bh
- Flush Bolt DKS FB SQ 501 370MM ZC Dekkson bh

Pintu besi single ukuran 1000x2200mm, termasuk


3.6.1.2.5 kunci, accessories, finishing cat ducco dan R. lift atap
perlengkapan lainnya
3.6.1.2.5.1 Pada Pintu Type PE-05 unit 2,00

3.6.1.2.5.2 Kunci & Accessories : Pintu Type PE-05 unit 2,00


- Lever Handle DKS LHTR 016 22MM SSS Dekkson ps
- Mortise DKS DC IL DL8672 SSS Dekkson bh
- Cylinder DKS DC DL 70MM SN Dekkson bh
- Hinge DKS DL 4.5x4x3MM 2BB SSS Dekkson ps
- Door Closer DKS DCL 105 NHO NA Dekkson Set

Pintu besi ukuran 720x2200mm terbuat dari holloe steel


3.6.1.2.6 40x40 mm dan besi diameter 12 mm, termasuk kunci,
accessories, finish cat duco dan perlengkapan lainnya
3.6.1.2.6.1 Pada Pintu Type PB-01 unit 5,00

3.6.1.2.6.2 Kunci & Accessories : Pintu Type PB-01 unit 5,00


- Lever Handle DKS LHTR 016 22MM SSS Dekkson ps
- Mortise DKS DC IL DL8672 SSS Dekkson bh
- Cylinder DKS DC DL 70MM SN Dekkson bh
- Hinge DKS DL 4.5x4x3MM 2BB SSS Dekkson ps

3.6.1.3 PINTU & JENDELA ALLUMUNIUM & KACA

Jendela kaca framelless ukuran 10600x1900mm, kaca


3.6.1.3.1 tempered tebal 12 mm, termasuk accessories, sealant M2 30,68
dan perlengkapan lainnya
Pada Jendela Type J- 01

Curtain wall stick system rangka alluminium powder


3.6.1.3.2 coating, dengan kaca 10 mm, termasuk accessories, M2 120,00
sealant dan perlengkapan lainnya
Pada Jendela Type J- 02

Curtain wall stick system rangka alluminium powder


3.6.1.3.3 coating, dengan kaca 10 mm, termasuk accessories, M2 18,08
sealant dan perlengkapan lainnya
Pada Jendela Type J- 03

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 20
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

Jendela kaca dan curtain wall ukuran 2668 x 3725 mm,


rangka alluminium powder coating dengan jendela
ukuran 2668 x 2950 mm terdiri dari 2 pias vertikal dan 2
3.6.1.3.4
pias horizontal dengan 1 bukaan jendela, kosen
alluminium, kaca tempered clear tebal 8 mm, termasuk,
accessories, sealant dan perlengkapan lainnya
3.6.1.3.4.1 Pada Jendela Type J- 04.1 unit 3,00

3.6.1.3.4.2 Kunci & Accessories : Jendela Type J-04.1 Set 3,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

Jendela kaca dan Curtain wall ukuran 2668 x 2915 mm,


rangka alluminium powder coating dengan jendela
ukuran 2668 x 2150 mm terdiri dari 2 pias vertikal dan 3
3.6.1.3.5
pias horizontal, kosen alluminium, kaca tempered clear
tebal 8 mm, termasuk, accessories, sealant dan
perlengkapan lainnya
3.6.1.3.5.1 Pada Jendela Type J- 04.2 unit 11,00

3.6.1.3.5.2 Kunci & Accessories : Jendela Type J-04.2 Set 11,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

Curtain wall stick system rangka alluminium powder


3.6.1.3.6 coating, dengan kaca tempered 10 mm, termasuk M2 924,99
accessories, sealant dan perlengkapan lainnya
Pada Jendela Type J- 05

Curtain wall stick system rangka alluminium powder


3.6.1.3.7 coating, dengan kaca tempered 10 mm, termasuk Type J5A M2 219,23
accessories, sealant dan perlengkapan lainnya
Pada Jendela Type J- 05 A

Pintu double framelless ukuran 2x900x2600 mm, kaca


3.6.1.3.8
tempered tebal 12 mm
3.6.1.3.8.1 Pada Type PKC-1 ( J-1, J-6, J-7 & J-13 ) unit 8,00

3.6.1.3.8.2 Kunci & Accessories : Pintu Type PKC-1 Set 16,00


- lever Handle DKS LHTR 84030 Oval SSS Dekkson pcs
- Mortise Lock DKS MTS IL DL84030 SSS Dekkson Set
- Cylinder DKS DC DL65MM SN Dekkson bh
- Hinge DKS ESS DL4x3x2mm 2BB Dekkson pcs
- Door Stoper DKS DCL 300 NHO NA Dekkson Set

Pintu single framelless ukuran 800x2400 mm, kaca


3.6.1.3.9
tempered tebal 12 mm
3.6.1.3.9.1 Pada Type PKC-2 ( J-10, J-11 & J-3 ) unit 3,00

3.6.1.3.9.2 Kunci & Accessories : Pintu Type PKC-2 Set 3,00


- lever Handle DKS LHTR 84030 Oval SSS Dekkson pcs
- Mortise Lock DKS MTS IL DL84030 SSS Dekkson Set
- Cylinder DKS DC DL65MM SN Dekkson bh
- Hinge DKS ESS DL4x3x2mm 2BB Dekkson pcs
- Door Stoper DKS DCL 300 NHO NA Dekkson Set

Curtain wall stick system rangka alluminium powder


3.6.1.3.10 coating, dengan kaca 10 mm, termasuk accessories, M2 144,00
sealant dan perlengkapan lainnya
Pada Jendela Type J- 08

3.6.1.3.11 Dinding kaca tempered tebal 12 mm M2 84,00


Pada Jendela Type J- 09

Curtain wall stick system rangka alluminium powder


3.6.1.3.12 coating, dengan kaca 10 mm, termasuk accessories, Restaurant VIP M2 64,00
sealant dan perlengkapan lainnya
Pada Jendela Type J- 10

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 21
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.6.1.3.13 Dinding kaca tempered tebal 12 mm Restaurant VIP M2 48,00
Pada Jendela Type J- 11

Curtain wall stick system rangka alluminium powder


3.6.1.3.14 coating, dengan kaca 10 mm, termasuk accessories, M2 12,00
sealant dan perlengkapan lainnya
Pada Jendela Type J- 12

Jendela Jalusi alluminium powder coating ukuran 1200 x


2350 mm, kosen alluminium powder coating dan Jalusi
3.6.1.3.15 unit 15,00
alluminium powder coating, termasuk, accessories,
sealant dan perlengkapan lainnya
Pada Jendela Type JL- 01

Jendela Jalusi alluminium powder coating ukuran 900 x


2350 mm, kosen alluminium powder coating dan Jalusi
3.6.1.3.16 unit 9,00
alluminium powder coating, termasuk, accessories,
sealant dan perlengkapan lainnya
Pada Jendela Type JL- 02

3.6.2 PEKERJAAN PINTU & JENDELA KAMAR

3.6.2.1 PINTU KAYU

Pintu kayu single Solid Tora Tora ukuran 1000 x


2350mm dengan arcitraf meranti oven lapis veneer
3.6.2.1.1
sapele ukuran lebar 100 mm, kusen kayu Tora Tora
ukuran 50/150mm
3.6.2.1.1.1 Pada Pintu Type PK- 01 unit 188,00

3.6.2.1.1.2 Kunci & Accessories : Pintu Type PK- 01 Set 188,00


- Hinge DKS ESS DL4X3X3MN 2BB
- Door View DKS DV 200 CP
- Door Guard DKS DG 81005 SN
- Door Closer DKS DCL 522 NA

3.6.2.1.2 Cardlock
3.6.2.1.2.1 Card Lock CLH 1001 RF (Right/Left) SN Dekkson Set 155,00
3.6.2.1.2.2 Contactiess Card Dekkson pcs 1,00
3.6.2.1.2.3 Encoder RF/TM Card Read Write Dekkson Set 1,00
-. Sofware Dekkson Set
-. Data Recorder RF/TM Dekkson Set
3.6.2.1.2.4 Contactiess Card Dekkson pcs 310,00

3.6.2.1.3 Optimal
3.6.2.1.3.1 Safe Box Dekkson SB 420 Dekkson pcs 155,00
3.6.2.1.3.2 Energy saving switch ES SWITCH 808 Dekkson pcs 155,00
3.6.2.1.3.3 Energy saving switch ES SWITCH RF809 Dekkson pcs 155,00
3.6.2.1.3.4 Door Bell Switch DB 3 IN 1 Dekkson pcs 155,00
3.6.2.1.3.5 Elevator Reader ER RF/TM 16 nd Floor Dekkson Set 2,00

Pintu kayu Conecting Solid Tora Tora ukuran


3.6.2.1.4 1000x2200mm etrdiri dari 2 daun pintu muka & belakang
, dengan kusen kayu ukuran 50/150mm
3.6.2.1.4.1 Pada Pintu Type PK- 01 ( Conecting door ) unit 13,00

3.6.2.1.4.2 Kunci & Accessories : Pintu Type PK- 01 ( Conecting Door ) Set 26,00
- lever Handle DKS LHTR 004 SSS Dekkson pcs
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL40MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 2BB Dekkson pcs

Pintu kayu single Solid Tora Tora ukuran 1600 x


2350mm dengan arcitraf meranti oven lapis veneer
3.6.2.1.5
sapele ukuran lebar 100 mm, kusen kayu Tora Tora
ukuran 50/150mm
3.6.2.1.5.1 Pada Pintu Type PK- 02 unit 3,00

3.6.2.1.5.2 Kunci & Accessories : Pintu Type PK- 02 Set 3,00


- Pull Handle DKS PH 815 20x40x600 SSS Dekkson ps
- Escutheon DKS ESCN 855 SSS Dekkson ps

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 22
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
- Mortise Lock DKS MTS RL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL60MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 2BB Dekkson ps
- Door Closer DKS DCL 300 NHO NA Dekkson Set
- Flush Bolt DKS FB 040 8+12" SSS Dekkson ps

Pintu kayu single Solid Tora Tora ukuran 800x2350mm


3.6.2.1.6
dengan kusen kayu ukuran 50/150mm
3.6.2.1.6.1 Pada Pintu Type PT- 01 unit 176,00

3.6.2.1.6.2 Kunci & Accessories : Pintu Type PT- 01 Set 176,00


- lever Handle DKS LHTR 004 SSS Dekkson pcs
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL40MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 2BB Dekkson pcs
- Door Stoper DKS DS 886 SN Dekkson bh

Pintu kayu single Solid Tora Tora ukuran 700x2200mm


3.6.2.1.7
dengan kusen kayu ukuran 50/150mm
3.6.2.1.7.1 Pada Pintu Type P- 06 B unit 12,00

3.6.2.1.7.2 Kunci & Accessories : Pintu Type P- 06 B Set 12,00


- lever Handle DKS LHTR 004 SSS Dekkson pcs
- Mortise Lock DKS MTS IL DL8585 SSS Dekkson Set
- Cylinder DKS DC DL40MM SN Dekkson bh
- Hinge DKS ESS DL4x3x3mm 2BB Dekkson pcs
- Door Stoper DKS DS 886 SN Dekkson bh

Pintu kayu double Solid Tora Tora ukuran 900x1300mm


3.6.2.1.8
dengan kusen kayu ukuran 50/150mm
3.6.2.1.8.1 Pada Pintu Type PS- 02 unit 93,00

3.6.2.1.8.2 Kunci & Accessories : Pintu Type PS- 02 Set 93,00


- Pull Plate DKS PP 009 SSS Dekkson ps
- Hinge DKS ESS DL3x2.5x2mm 2BB Dekkson pcs
- Window Bolt With Key SSS Dekkson bh
- Flush Bolt DKS FB 040 8+12" SSS Dekkson bh

3.6.2.2 PEKERJAAN PINTU ALLUMINIUM & KACA

Pintu dan jendela alluminium powder coating dengan


ukuran 1700 x2400mm, dengan pintu kaca rangka
alluminium powder coating ukuran 940x2350mm, dan
3.6.2.2.1
jendela gendong ukuran 1 x 700 x 2050 mm kaca clear
tebal 6 mm, termasuk, accessories, sealant dan
perlengkapan lainnya
3.6.2.2.1.1 Pada Pintu Type PJ- 14 unit 1,00

3.6.2.2.1.2 Kunci & Accessories : Pintu Type PJ-14 Set 1,00


- lever Handle DKS LHTR 84030 Oval SSS Dekkson pcs
- Mortise Lock DKS MTS IL DL84030 SSS Dekkson Set
- Cylinder DKS DC DL65MM SN Dekkson bh
- Hinge DKS ESS DL4x3x2mm 2BB Dekkson pcs
- Door Stoper DKS DCL 300 NHO NA Dekkson Set

Pintu double framelless dan jendela ukuran 2950x 2350


mm, kaca tempered tebal 12 mm, pintu ukuran 1 x 1500
3.6.2.2.2
x 2350 mm, termasuk accessories, sealant dan
perlengkapan lainnya
3.6.2.2.2.1 Pada Pintu Type PJ- 15 unit 1,00

3.6.2.2.2.2 Kunci & Accessories : Pintu Type PJ-15 Set 1,00


- Pull Handle DKS PH DL 802 38X1000 SSS Dekkson ps
- Patch Fitting DKS PT 10, PT20, US10+Cyl Dekkson Set
- Patch Fitting : DKS PT 24 PSS Dekkson bh
- Floor Hinge DKS FH 84 BD Dekkson Set

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 23
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Pintu double framelless dan jendela ukuran 3050x 2350
mm, kaca tempered tebal 12 mm, pintu ukuran 1 x 1500
3.6.2.2.3
x 2350 mm, termasuk accessories, sealant dan
perlengkapan lainnya
3.6.2.2.3.1 Pada Pintu Type PJ- 16 unit 1,00

3.6.2.2.3.2 Kunci & Accessories : Pintu Type PJ-16 Set 1,00


- Pull Handle DKS PH DL 802 38X1000 SSS Dekkson ps
- Patch Fitting DKS PT 10, PT20, US10+Cyl Dekkson Set
- Patch Fitting : DKS PT 24 PSS Dekkson bh
- Floor Hinge DKS FH 84 BD Dekkson Set

Jendela kaca alluminium powder coating ukuran 750 x


6090 mm dengan jendela 2 daun ukuran 2 x 750 x 2100
3.6.2.2.4 mm, kosen alluminium powder coating dan kaca clear 8 Kamar
mm, termasuk, accessories, sealant dan perlengkapan
lainnya
3.6.2.2.4.1 Pada Jendela Type J- 12 unit 66,00

3.6.2.2.4.2 Kunci & Accessories : Jendela Type J-12 Set 33,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

Jendela kaca alluminium powder coating ukuran 750 x


5290 mm dengan jendela 2 daun ukuran 2 x 750 x 2100
3.6.2.2.5 mm, kosen alluminium powder coating dan kaca clear 8 Kamar
mm, termasuk, accessories, sealant dan perlengkapan
lainnya
3.6.2.2.5.1 Pada Jendela Type J- 13 unit 252,00

3.6.2.2.5.2 Kunci & Accessories : Jendela Type J-13 Set 126,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

Jendela kaca alluminium powder coating ukuran 750 x


4000 mm dengan jendela 1 daun ukuran 1 x 750 x 2100
3.6.2.2.6 mm, kosen alluminium powder coating dan kaca clear 8 Kamar
mm, termasuk, accessories, sealant dan perlengkapan
lainnya
3.6.2.2.6.1 Pada Jendela Type J- 14 unit 4,00

3.6.2.2.6.2 Kunci & Accessories : Jendela Type J-14 Set 4,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

Jendela kaca alluminium powder coating ukuran 750 x


3000 mm dengan jendela 1 daun ukuran 1 x 750 x 1590
3.6.2.2.7 mm, kosen alluminium powder coating dan kaca clear 8 Kamar
mm, termasuk, accessories, sealant dan perlengkapan
lainnya
3.6.2.2.7.1 Pada Jendela Type J- 15 unit 8,00

3.6.2.2.7.2 Kunci & Accessories : Jendela Type J-15 Set 8,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

Jendela kaca alluminium powder coating ukuran 750 x


5300 mm dengan jendela 2 daun ukuran 1 x 750 x 2100
3.6.2.2.8 mm dan 1 x 750 x 1590 mm, kosen alluminium powder Kamar
coating dan kaca clear 8 mm, termasuk, accessories,
sealant dan perlengkapan lainnya
3.6.2.2.8.1 Pada Jendela Type J- 16 unit 16,00

3.6.2.2.8.2 Kunci & Accessories : Jendela Type J-16 Set 32,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 24
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Jendela kaca alluminium powder coating ukuran 1000 x
2100 mm dengan jendela 1 daun ukuran 1 x 1000 x
3.6.2.2.9 2100 mm, kosen alluminium powder coating dan kaca Kamar
clear 6 mm, termasuk, accessories, sealant dan
perlengkapan lainnya
3.6.2.2.9.1 Pada Jendela Type J- 17 unit 6,00

3.6.2.2.9.2 Kunci & Accessories : Jendela Type J-17 Set 7,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

Jendela kaca alluminium powder coating ukuran 1650 x


3.6.2.2.10 2100 mm, kaca clear tebal 6 mm, termasuk, Kamar unit 11,00
accessories, sealant dan perlengkapan lainnya
Pada Jendela Type J- 17 A

Jendela kaca alluminium powder coating ukuran 1610 x


2910 mm dengan jendela 1 daun ukuran 1 x 1610 x
3.6.2.2.11 2910 mm, kosen alluminium powder coating dan kaca Kamar
clear 6 mm, termasuk, accessories, sealant dan
perlengkapan lainnya
3.6.2.2.11.1 Pada Jendela Type J- 18 unit 1,00

3.6.2.2.11.2 Kunci & Accessories : Jendela Type J-18 Set 1,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

Jendela kaca alluminium powder coating ukuran 1610 x


2110 mm dengan jendela 1 daun ukuran 1 x 1610 x
3.6.2.2.12 2110 mm, kosen alluminium powder coating dan kaca Kamar unit 6,00
clear 6 mm, termasuk, accessories, sealant dan
perlengkapan lainnya
3.6.2.2.12.1 Pada Jendela Type J- 18 A

3.6.2.2.12.2 Kunci & Accessories : Jendela Type J-18 A Set 6,00


- Hinges : DKS ESS DL4X3X2MM 2BB Dekkson ps
- Window Stay WS 001 8" SSS Dekkson bh
- Casement HDL DKS CH 425 WH Dekkson bh

Jendela kaca alluminium powder coating ukuran 1450 x


3.6.2.2.13 1800 mm, kaca clear tebal 6 mm, termasuk, Kamar unit 11,00
accessories, sealant dan perlengkapan lainnya
Pada Jendela Type J- 19

Jendela kaca mati , rangka alluminium powder coating


ukuran 1 x 850 x 1800 mm, kosen alluminium, kaca
3.6.2.2.14 Kamar unit 12,00
clear tebal 6 mm, termasuk, accessories, sealant dan
perlengkapan lainnya
Pada Jendela Type J- 20

Jendela kaca framelless ukuran 3850x1450 mm, kaca


3.6.2.2.15 tempered tebal 10 mm, termasuk accessories, sealant Kamar unit 1,00
dan perlengkapan lainnya
Pada Jendela Type J- 21

Folding partisi ukuran 5235 x 3100 mm , termasuk rel,


3.6.2.2.16 R. Meeting Lt. 14 unit 3,00
kunci accessories, sealant dan perlengkapan lainnya

SUB TOTAL PEKERJAAN PINTU & JENDELA

3.6.1 PEKERJAAN PINTU & JENDELA PUBLIC AREA


3.6.1.1 PINTU KAYU
3.6.1.2 PINTU BESI
3.6.1.3 PINTU & JENDELA ALLUMUNIUM & KACA

3.6.2 PEKERJAAN PINTU & JENDELA KAMAR


3.6.2.1 PINTU KAYU
3.6.2.2 PEKERJAAN PINTU ALLUMINIUM & KACA

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 25
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

3.7 SUB PEKERJAAN PELAPIS LANTAI

3.7.1 LANTAI BASEMENT


3.7.1.1 Lobby Lift
Lantai homogeneous tile ukuran 600x600 mm Motif
3.7.1.1.1 M2 19,14
Kombinasi termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.1.1.2 M 37,00
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.1.1.3 M2 35,76
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.1.2 Pada Tangga M 43,04
grouting dan perapihan

Lantai HT ex Granada ukuran 600x600 mm termasuk


3.7.1.3 Ruang BOH
adukan, grouting dan perapihan
Ruang Accounting, Houskeeping/office, Clean Solid,
3.7.1.3.1 M2 170,33
Loundry
3.7.1.3.2 Ruang Filling Storage & Fitnes M2 62,61
3.7.1.3.3 Ruang General Storage dan F&B M2 40,20
3.7.1.3.4 Ruang HRD & EDR Dinning M2 141,30
3.7.1.3.5 Ruang Lokcker Pria M2 47,90
3.7.1.3.6 Uniform Room & Locker Wanita M2 65,56
3.7.1.3.7 Mushola & Engineering M2 48,94
3.7.1.3.8 Pada Toilet - Mushola M2 108,00
3.7.1.3.9 Ruang Purchashing & Lift Service M2 41,58
3.7.1.3.10 Seafood & Vegetable Chiller M2 37,96
3.7.1.3.11 Waiste Garbage M2 16,40

Lantai HT ex Granada ukuran 600x600 mm termasuk


3.7.1.4 Ruang Onzane
adukan, grouting dan perapihan
3.7.1.4.1 Ruang Onzane & Masage Pria M2 48,20
3.7.1.4.2 Ruang Onzane & Masage Wanita M2 91,33

Lantai dan dinding mozaik ex china termasuk adukan, Ruang Onzane Hot
3.7.1.5 M2 280,00
grouting dan perapihan & Cold

Topping andesit ukuran 300x600 mm termasuk adukan,


3.7.1.6 Ruang Onzane M' 186,00
grouting dan perapihan

Lantai HT ex Granada ukuran 600x600 mm termasuk


3.7.1.7 Toilet
adukan, grouting dan perapihan
3.7.1.7.1 Pada Toilet Public - Wanita M2 16,00
3.7.1.7.2 Pada Toilet Public - Pria M2 9,00
3.7.1.7.3 Pada Toilet - Karyawan M2 45,00

Dinding HT ex Granada ukuran 600x600 mm termasuk


3.7.1.8 Toilet
adukan, grouting dan perapihan
3.7.1.8.1 Pada dinding Toilet Public - Wanita M2 70,97
3.7.1.8.2 Pada dinding Toilet Public - Pria M2 65,97
3.7.1.8.3 Pada dinding Toilet Karyawan M2 88,29

Pada Toilet -
3.7.1.9 Rising level area Toilet Karyawan bata ringan M2 45,00
Karyawan

Lantai HT ex Granada ukuran 600x600 mm termasuk


3.7.1.10 Ruang GWT M2 456,00
adukan, grouting dan perapihan

Skirting HT ex Granada ukuran 150X600 mm termasuk


3.7.1.11 Lantai Basement M 973,92
adukan, grouting dan perapihan

3.7.2 LANTAI 1

3.7.2.1 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.2.1.1 Motif Kombinasi termasuk adukan, grouting dan M2 18,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.2.1.2 M 18,89
termasuk adukan, grouting dan perapihan

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 26
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Dinding homogeneous tile ukuran 600x1200 mm
3.7.2.1.3 M2 46,20
termasuk adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 800x800 mm termasuk
Ruang Lobby &
3.7.2.1.4 adukan, grouting dan perapihan - Ruang Lobby & M2 518,94
Terrace Dropp
Terrace Dropp
Lantai homogeneous tile ukuran 800x800 mm termasuk
Ruang Lobby &
3.7.2.1.5 adukan, grouting dan perapihan - Ruang Lobby & M2 123,94
Terrace Dropp
Terrace Dropp
Skirting homogeneous tile ukuran 200X800 mm
3.7.2.1.6 M 418,20
termasuk adukan, grouting dan perapihan
Lantai HT Light Emperador termasuk adukan, grouting
3.7.2.1.7 Pada Main Lobby M2 64,33
dan perapihan

Step Nossing HT ex Granada 10x30 cm termasuk


3.7.2.2 Pada Tangga M 51,61
adukan, grouting dan perapihan

3.7.2.3 Toilet Public


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.2.3.1 M2 20,07
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.2.3.2 M2 81,14
termasuk adukan, grouting dan perapihan
3.7.2.3.3 Waterproofing M2 58,59

Lantai & Dinding Andesit ukuran 100x100 mm termasuk


3.7.2.4 Pada Water Feature M2 90,00
adukan, grouting dan perapihan

3.7.2.5 Front Office, Data Center, dll


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.2.5.1 M2 139,64
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.2.5.2 M 152,59
termasuk adukan, grouting dan perapihan

Lantai homogeneous tile ukuran 600x600 mm termasuk Dropp Off - ( HT. 60


3.7.2.6 M2 74,60
adukan, grouting dan perapihan x 60 Cm )

3.7.2.7 Terrace Water Feature


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.2.7.1 M2 190,95
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.2.7.2 M 218,41
termasuk adukan, grouting dan perapihan

Portal Enterance homogeneous tile ukuran 400X400 mm


3.7.2.8 Portal Enterance M2 90,49
termasuk adukan, grouting dan perapihan

Skirting homogeneous tile ukuran 150X600 mm Trap Tangga &


3.7.2.9 M 90,80
termasuk adukan, grouting dan perapihan Border Enterance

3.7.2.10 Terrace Samping


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.2.10.1 M2 76,27
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.2.10.2 M 100,66
termasuk adukan, grouting dan perapihan

3.7.2.11 Terrace Belakang


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.2.11.1 M2 105,00
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.2.11.2 M' 70,00
termasuk adukan, grouting dan perapihan

3.7.2.12 Tanggulan Terrace belakang & samping Plester Aci M' 86,00

Lantai homogeneous tile ukuran 150x600 mm termasuk Pool Deck - HT.


3.7.2.13 M2 192,00
adukan, grouting dan perapihan Granada Maple Oak

Lantai Keramik mozaik ex china ukuran 20x20 mm


3.7.2.14 Pool & kid pool M2 306,00
termasuk adukan, grouting dan perapihan

Topping Gutter
Lantai homogeneous tile ukuran 300x600 mm termasuk
3.7.2.15 Kolam Renang - M' 100,00
adukan, grouting dan perapihan
Andesit

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 27
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Tangga peralihan
Lantai homogeneous tile ukuran 300x600 mm termasuk
3.7.2.16 Pool Deck ke M' 28,00
adukan, grouting dan perapihan
Terrace

3.7.2.17 Ruang Bilas


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.2.17.1 M2 15,00
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.2.17.2 M2 42,00
termasuk adukan, grouting dan perapihan

Pool Deck -
3.7.2.18 Tangga dari Lt. Basement ke Lt. 1 M2 31,50
Keramik

3.7.3 LANTAI 2

3.7.3.1 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.3.1.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.3.1.2 M 18,89
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.3.1.3 M2 34,45
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.3.2 Pada Tangga M 47,94
grouting dan perapihan

3.7.3.3 Toilet Public


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.3.3.1 M2 20,07
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.3.3.2 M2 81,20
termasuk adukan, grouting dan perapihan
3.7.3.3.3 Waterproofing M2 58,59

3.7.3.4 Lantai Restaurant


Lantai homogeneous tile ukuran 800x800 mm termasuk
3.7.3.4.1 M2 296,64
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 200X800 mm
3.7.3.4.2 M 200,18
termasuk adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 200x800 mm termasuk
3.7.3.4.3 M2 221,41
adukan, grouting dan perapihan
3.7.3.4.4 Lantai island teraso ukuran 600X600 M2 64,00

3.7.3.5 Area Kitchen


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.3.5.1 M2 120,00
adukan, grouting dan perapihan
Dinding Kitchen homogeneous tile ukuran 600X600 mm
3.7.3.5.2 M 180,00
termasuk adukan, grouting dan perapihan
3.7.3.5.3 Rising level area kitchen bata ringan M2 120,00

3.7.3.6 Outdoor Terrace


Lantai HT. Granada Matt ukuran 600x600 mm termasuk
3.7.3.6.1 M2 192,00
adukan, grouting dan perapihan
3.7.3.6.2 Skirting Area Outdoor Terrace ukuran 150X600 M' 78,00
3.7.3.6.3 Waterproofing Outdoor Terrace M2 192,00

3.7.4 LANTAI 3

3.7.4.1 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.4.1.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.4.1.2 M 18,89
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.4.1.3 M2 34,19
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.4.2 Pada Tangga M 47,94
grouting dan perapihan

3.7.4.3 Ruang General Storage dan F&B


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.4.3.1 M2 43,80
adukan, grouting dan perapihan

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 28
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Skirting homogeneous tile ukuran 150X600 mm
3.7.4.3.2 M 69,75
termasuk adukan, grouting dan perapihan

3.7.4.4 Toilet Public


Dinding homogeneous tile ukuran 600x600 mm
3.7.4.4.1 M2 96,00
termasuk adukan, grouting dan perapihan
3.7.4.4.2 Waterproofing M2 32,00
3.7.4.4.3 Lantai Toilet Public HT. Granada M2 32,00

3.7.4.5 Outdoor Terrace


Lantai HT. Granada Matt ukuran 600x600 mm termasuk
3.7.4.5.1 M2 16,00
adukan, grouting dan perapihan
3.7.4.5.2 Skirting Area Outdoor Terrace ukuran 150X600 M' 20,00
3.7.4.5.3 Waterproofing Outdoor Terrace M2 16,00

3.7.4.6 Prefunction
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.4.6.1 M2 24,34
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.4.6.2 M' 27,70
termasuk adukan, grouting dan perapihan
0,00
3.7.4.7 Carpet Tile Meeting Room Meeting Room M2 304,75
0,00
3.7.4.8 Carpet Tile Meeting Room Corridor Coridor M2 49,28

3.7.5 LANTAI 4

3.7.5.1 Pada Kamar


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.5.1.1 M2 223,87
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.5.1.2 M2 67,20
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.5.1.3 M 214,70
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X600 mm termasuk
3.7.5.1.4 M 112,00
adukan, grouting dan perapihan

3.7.5.2 Pada Koridor


Lantai border homogeneous tile ukuran 300x600 mm
3.7.5.2.1 M' 29,41
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.5.2.2 M 98,05
termasuk adukan, grouting dan perapihan

3.7.5.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.5.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.5.3.2 M 18,79
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.5.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.5.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.5.5 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.5.5.1 M2 55,67
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.5.5.2 M2 286,08
termasuk adukan, grouting dan perapihan
3.7.5.5.3 Waterproofing M2 56,23
0,00
3.7.5.6 Carpet Tile Coridor M2 68,75

3.7.6 LANTAI 5

3.7.6.1 Pada Kamar


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.6.1.1 M2 230,33
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.6.1.2 M2 68,87
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.6.1.3 M 235,02
termasuk adukan, grouting dan perapihan
M 165,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 29
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.7.6.2 Pada Koridor 0,00
Lantai border homogeneous tile ukuran 300x600 mm
3.7.6.2.1 M' 29,40
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.6.2.2 M 97,99
termasuk adukan, grouting dan perapihan

3.7.6.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.6.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.6.3.2 M 18,79
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.6.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.6.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.6.5 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.6.5.1 M2 56,64
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.6.5.2 M2 286,08
termasuk adukan, grouting dan perapihan
3.7.6.5.3 Waterproofing M2 56,23
0,00
3.7.6.6 Carpet Tile Coridor M2 68,75

3.7.7 LANTAI 6

3.7.7.1 Pada Kamar


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.7.1.1 M2 223,87
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.7.1.2 M2 67,20
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.7.1.3 M 214,70
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X600 mm termasuk
3.7.7.1.4 M 112,00
adukan, grouting dan perapihan

3.7.7.2 Pada Koridor


Lantai border homogeneous tile ukuran 300x600 mm
3.7.7.2.1 M' 29,41
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.7.2.2 M 98,05
termasuk adukan, grouting dan perapihan

3.7.7.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.7.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.7.3.2 M 18,79
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.7.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.7.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.7.5 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.7.5.1 M2 55,67
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.7.5.2 M2 286,08
termasuk adukan, grouting dan perapihan
3.7.7.5.3 Waterproofing M2 56,23
0,00
3.7.7.6 Carpet Tile Coridor M2 68,75

3.7.8 LANTAI 7

3.7.8.1 Pada Kamar


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.8.1.1 M2 223,58
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.8.1.2 M2 68,87
adukan, grouting dan perapihan

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 30
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Skirting homogeneous tile ukuran 150X600 mm
3.7.8.1.3 M 213,18
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X600 mm termasuk
3.7.8.1.4 M 112,00
adukan, grouting dan perapihan

3.7.8.2 Pada Koridor


Lantai border homogeneous tile ukuran 300x600 mm
3.7.8.2.1 M' 23,04
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.8.2.2 M 76,82
termasuk adukan, grouting dan perapihan

3.7.8.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.8.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.8.3.2 M 18,79
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.8.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.8.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.8.5 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.8.5.1 M2 56,63
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.8.5.2 M2 286,08
termasuk adukan, grouting dan perapihan
3.7.8.5.3 Waterproofing M2 56,23
0,00
3.7.8.6 Carpet Tile Coridor M2 68,75

3.7.9 LANTAI 8

3.7.9.1 Pada Kamar


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.9.1.1 M2 223,62
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.9.1.2 M2 67,20
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.9.1.3 M 213,20
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X600 mm termasuk
3.7.9.1.4 M 112,00
adukan, grouting dan perapihan

3.7.9.2 Pada Koridor


Lantai border homogeneous tile ukuran 300x600 mm
3.7.9.2.1 M' 30,87
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.9.2.2 M 102,89
termasuk adukan, grouting dan perapihan

3.7.9.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.9.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.9.3.2 M 18,79
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.9.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.9.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.9.5 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.9.5.1 M2 56,62
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.9.5.2 M2 286,08
termasuk adukan, grouting dan perapihan
3.7.9.5.3 Waterproofing M2 56,23
0,00
3.7.9.6 Carpet Tile Coridor M2 68,75

3.7.10 LANTAI 9

3.7.10.1 Pada Kamar

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 31
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.10.1.1 M2 223,58
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.10.1.2 M2 68,87
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.10.1.3 M 213,18
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X600 mm termasuk
3.7.10.1.4 M 112,00
adukan, grouting dan perapihan

3.7.10.2 Pada Koridor


Lantai border homogeneous tile ukuran 300x600 mm
3.7.10.2.1 M' 23,04
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.10.2.2 M 76,82
termasuk adukan, grouting dan perapihan

3.7.10.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.10.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.10.3.2 M 18,79
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.10.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.10.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.10.5 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.10.5.1 Toilet Kamar M2 56,63
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.10.5.2 M2 286,08
termasuk adukan, grouting dan perapihan
3.7.10.5.3 Waterproofing M2 56,23
0,00
3.7.10.6 Carpet Tile Coridor M2 68,75

3.7.11 LANTAI 10

3.7.11.1 Pada Kamar


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.11.1.1 Pada Kamar M2 223,87
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.11.1.2 M2 67,20
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.11.1.3 M 214,70
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X600 mm termasuk
3.7.11.1.4 M 112,00
adukan, grouting dan perapihan

3.7.11.2 Pada Koridor


Lantai border homogeneous tile ukuran 300x600 mm
3.7.11.2.1 M' 29,41
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.11.2.2 M 98,05
termasuk adukan, grouting dan perapihan

3.7.11.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.11.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.11.3.2 M 18,79
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.11.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.11.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.11.5 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.11.5.1 Toilet Kamar M2 55,67
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.11.5.2 M2 286,08
termasuk adukan, grouting dan perapihan
3.7.11.5.3 Waterproofing M2 56,23

3.7.11.6 Carpet Tile Coridor M2 68,75

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 32
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

3.7.12 LANTAI 11

3.7.12.1 Pada Kamar


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.12.1.1 Pada Kamar M2 230,33
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.12.1.2 M2 68,87
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.12.1.3 M 235,02
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X600 mm termasuk
3.7.12.1.4 M 165,00
adukan, grouting dan perapihan

3.7.12.2 Pada Koridor


Lantai border homogeneous tile ukuran 300x600 mm
3.7.12.2.1 M' 29,40
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.12.2.2 M 97,99
termasuk adukan, grouting dan perapihan

3.7.12.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.12.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.12.3.2 M 18,79
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.12.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.12.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.12.5 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.12.5.1 M2 56,64
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.12.5.2 M2 286,08
termasuk adukan, grouting dan perapihan
3.7.12.5.3 Waterproofing M2 56,23
0,00
3.7.12.6 Carpet Tile Coridor M2 68,75

3.7.13 LANTAI 12

3.7.13.1 Pada Kamar


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.13.1.1 M2 245,51
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.13.1.2 M2 72,24
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.13.1.3 M 186,22
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X600 mm termasuk
3.7.13.1.4 M 110,35
adukan, grouting dan perapihan

3.7.13.2 Pada Koridor


Lantai border homogeneous tile ukuran 300x600 mm
3.7.13.2.1 M' 30,89
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.13.2.2 M 102,95
termasuk adukan, grouting dan perapihan

3.7.13.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.13.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.13.3.2 M 18,74
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.13.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.13.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.13.5 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.13.5.1 M2 44,95
adukan, grouting dan perapihan

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 33
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Dinding homogeneous tile ukuran 600x600 mm
3.7.13.5.2 M2 216,70
termasuk adukan, grouting dan perapihan
3.7.13.5.3 Waterproofing M2 56,23

3.7.13.6 Carpet Tile Coridor M2 68,75

3.7.14 LANTAI 13

3.7.14.1 Pada Kamar


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.14.1.1 M2 247,84
adukan, grouting dan perapihan
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.14.1.2 M2 69,17
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.14.1.3 M 189,20
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X600 mm termasuk
3.7.14.1.4 M 113,94
adukan, grouting dan perapihan

3.7.14.2 Pada Koridor


Lantai border homogeneous tile ukuran 300x600 mm
3.7.14.2.1 M' 30,87
termasuk adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.14.2.2 M 102,89
termasuk adukan, grouting dan perapihan

3.7.14.2 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.14.2.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.14.2.2 M 18,74
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.14.2.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.14.3 Pada Tangga M 81,19
grouting dan perapihan

3.7.14.4 Toilet Kamar


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.14.4.1 M2 44,95
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.14.4.2 M2 216,70
termasuk adukan, grouting dan perapihan
3.7.14.4.3 Waterproofing M2 56,23

3.7.14.5 Carpet Tile Coridor M2 68,75

3.7.15 LANTAI 14

3.7.15.1 Pada Kamar


Lantai homogeneous tile ukuran 800x800 mm termasuk
3.7.15.1.1 M2 187,57
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X800 mm
3.7.15.1.2 M 48,87
termasuk adukan, grouting dan perapihan
Foyer homogeneous tile ukuran 150X800 mm termasuk
3.7.15.1.3 M 43,80
adukan, grouting dan perapihan

3.7.15.2 Pada Koridor


Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.15.2.1 M 68,75
adukan, grouting dan perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.15.2.2 M 64,00
termasuk adukan, grouting dan perapihan

3.7.15.3 Lobby Lift


Lantai border homogeneous tile ukuran 300x600 mm
3.7.15.3.1 Motif Kombinasi termasuk adukan, grouting dan M' 15,50
perapihan
Skirting homogeneous tile ukuran 150X600 mm
3.7.15.3.2 M 18,79
termasuk adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.15.3.3 M2 30,81
termasuk adukan, grouting dan perapihan

Nossing HT ex Granada 10x30 cm termasuk adukan,


3.7.15.4 Pada Tangga M 81,19
grouting dan perapihan

3.7.15.5 Toilet Kamar

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 34
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Lantai homogeneous tile ukuran 600x600 mm termasuk
3.7.15.5.1 M2 15,90
adukan, grouting dan perapihan
Dinding homogeneous tile ukuran 600x600 mm
3.7.15.5.2 M2 91,61
termasuk adukan, grouting dan perapihan

Waterproofing coating system tebal 3mm dengan screed


3.7.15.6 Plat dack Lantai 14 M2 70,99
tebal 5cm & wire mesh M4

3.7.15.7 Carpet Tile Coridor M2 68,75

3.7.15.8 Pool Deck Area Kolam Renang


Lantai homogeneous tile ukuran 150x600 mm termasuk
3.7.15.8.1 M2 99,49
adukan, grouting dan perapihan
Skirting kayu tinggi 100 mm termasuk melamic finish
3.7.15.8.2 M 53,45
dan perlengkapan lainnya.

3.7.15.9 Kolam Renang


3.7.15.9.1 Granite alam china Trap Tangga M2 15,00
Dinding & Lantai Keramik mozaik ex china ukuran
3.7.15.9.2 M2 92,00
100x100 mm termasuk adukan, grouting dan perapihan
3.7.15.9.3 Waterproofing M2 113,00

3.7.15.10 Lantai keramik mozaik ex china Jacuzi M2 21,00

Topping andesit ukuran 300x600 mm termasuk adukan, Topping Jacuzi dan


3.7.15.11 M2 14,00
grouting dan perapihan Kolam Renang

SUB TOTAL PEKERJAAN PELAPIS LANTAI

3.7.1 LANTAI BASEMENT


3.7.2 LANTAI 1
3.7.3 LANTAI 2
3.7.4 LANTAI 3
3.7.5 LANTAI 4
3.7.6 LANTAI 5
3.7.7 LANTAI 6
3.7.8 LANTAI 7
3.7.9 LANTAI 8
3.7.10 LANTAI 9
3.7.11 LANTAI 10
3.7.12 LANTAI 11
3.7.13 LANTAI 12
3.7.14 LANTAI 13
3.7.15 LANTAI 14

3.8 SUB PEKERJAAN PLAFOND

3.8.1 PUBLIC AREA

Plafond gypsum tebal 9 mm termasuk rangka Hollow


3.8.1.1 Main Lobby Lt. 1 M2 70,51
accesories dan perlengkapan lainnya

Plafond gypsum tebal 9 mm termasuk rangka Hollow,


3.8.1.2 Pada Lobby Lift
accesories dan perlengkapan lainnya
3.8.1.2.1 Lt. Basement M2 29,54
3.8.1.2.2 Lantai 1 M2 17,81
3.8.1.2.3 Lantai 2 M2 17,81
3.8.1.2.4 Lantai 3 M2 17,81
3.8.1.2.5 Lantai 4 M2 17,81
3.8.1.2.6 Lantai 5 M2 17,81
3.8.1.2.7 Lantai 6 M2 17,81
3.8.1.2.8 Lantai 7 M2 17,81
3.8.1.2.9 Lantai 8 M2 17,81
3.8.1.2.10 Lantai 9 M2 17,81
3.8.1.2.11 Lantai 10 M2 17,81
3.8.1.2.12 Lantai 11 M2 17,81
3.8.1.2.13 Lantai 12 M2 17,81

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 35
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.8.1.2.14 Lantai 13 M2 17,81
3.8.1.2.15 Lantai 14 M2 17,81

Plafond gypsum WR tebal 10 mm termasuk rangka


3.8.1.3 Lt. Basement M2 20,53
metal furing, accesories dan perlengkapan lainnya
Pada Toilet

Plafond gypsum WR tebal 10 mm termasuk rangka


3.8.1.4 Lt. Basement M2 66,93
Hollow accesories dan perlengkapan lainnya
Pada Toilet

Plafond gypsum WR tebal 10 mm termasuk rangka


3.8.1.5 Pada Toilet
Hollow accesories dan perlengkapan lainnya
3.8.1.5.1 Lantai 1 ( Tower 1 ) M2 10,40
3.8.1.5.2 Lantai 2 ( Tower 1 ) M2 13,75
3.8.1.5.3 Lantai 3 ( Tower 1 ) M2 15,46

Plafond gypsum tebal 9 mm termasuk rangka Hollow,


3.8.1.6
accesories dan perlengkapan lainnya
3.8.1.6.1 Lt. Basement M2 124,33
3.8.1.6.2 Lantai 1 M2 561,25
3.8.1.6.3 Lantai 2 ( Tower 1 ) M2 602,13
3.8.1.6.4 Lantai 3 ( Tower 1 ) M2 497,53

3.8.1.7 Finishing Plafond Expose Ex. Mortar


3.8.1.7.1 Lt. Basement M2 2.470,89
3.8.1.7.2 Lantai 1 M2 50,30
3.8.1.7.3 Lantai 2 M2 30,60
3.8.1.7.4 Lantai 3 M2 30,60

Plafond gypsum tebal 9 mm termasuk rangka Hollow,


3.8.1.8 Lantai 2 M2 108,74
accesories dan perlengkapan lainnya

Drop ceiling gypsum tebal 9 mm h=200 mm termasuk


3.8.1.9 Pada Lobby Lift
rangka full system, accesories dan perlengkapan lainnya
3.8.1.9.1 Lt. Basement M 31,40
3.8.1.9.2 Lantai 1 ( Tower 1 ) M 15,70
3.8.1.9.3 Lantai 2 ( Tower 1 ) M 15,70
3.8.1.9.4 Lantai 3 ( Tower 1 ) M 15,70
3.8.1.9.5 Lantai 4 ( Tower 1 ) M 15,70
3.8.1.9.6 Lantai 5 ( Tower 1 ) M 15,70
3.8.1.9.7 Lantai 6 M 15,70
3.8.1.9.8 Lantai 7 M 15,70
3.8.1.9.9 Lantai 8 M 15,70
3.8.1.9.10 Lantai 9 M 15,70
3.8.1.9.11 Lantai 10 M 15,70
3.8.1.9.12 Lantai 11 M 15,70
3.8.1.9.13 Lantai 12 M 15,70
3.8.1.9.14 Lantai 13 M 15,70
3.8.1.9.15 Lantai 14 M 15,70

Drop ceiling gypsum tebal 9 mm h=200 mm termasuk


3.8.1.10
rangka full system, accesories dan perlengkapan lainnya
3.8.1.10.1 Lantai 1 M 297,30
3.8.1.10.2 Lantai 2 M 140,63

Drop ceiling gypsum tebal 9 mm h=300 mm termasuk


3.8.1.11
rangka full system, accesories dan perlengkapan lainnya
3.8.1.11.1 Lantai 1 M 37,68
3.8.1.11.2 Lantai 3 M 95,42

3.8.1.12 Shadow line termasuk perapihan Pada Lobby Lift


3.8.1.12.1 Lt. Basement M 36,19
3.8.1.12.2 Lantai 1 ( Tower 1 ) M 15,18
3.8.1.12.3 Lantai 2 ( Tower 1 ) M 15,09
3.8.1.12.4 Lantai 3 ( Tower 1 ) M 15,09
3.8.1.12.5 Lantai 4 ( Tower 1 ) M 15,09
3.8.1.12.6 Lantai 5 ( Tower 1 ) M 15,09
3.8.1.12.7 Lantai 6 M 15,09

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 36
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.8.1.12.8 Lantai 7 M 15,09
3.8.1.12.9 Lantai 8 M 15,09
3.8.1.12.10 Lantai 9 M 15,09
3.8.1.12.11 Lantai 10 M 15,09
3.8.1.12.12 Lantai 11 M 15,09
3.8.1.12.13 Lantai 12 M 15,04
3.8.1.12.14 Lantai 13 M 15,04
3.8.1.12.15 Lantai 14 M 15,40

3.8.1.13 Shadow line termasuk perapihan


3.8.1.13.1 Lt. Basement M 916,98
3.8.1.13.2 Lantai 1 M 273,55
3.8.1.13.3 Lantai 2 M 273,55
3.8.1.13.4 Lantai 3 M 211,67

3.8.2 UNIT HOTEL & APARTEMENT

Plafond gypsum tebal 9 mm termasuk rangka Hollow,


3.8.2.1 Pada Kamar
accesories dan perlengkapan lainnya
3.8.2.1.1 Lantai 4 M2 224,40
3.8.2.1.2 Lantai 5 M2 230,59
3.8.2.1.3 Lantai 6 M2 224,40
3.8.2.1.4 Lantai 7 M2 230,64
3.8.2.1.5 Lantai 8 M2 224,40
3.8.2.1.6 Lantai 9 M2 230,64
3.8.2.1.7 Lantai 10 M2 224,40
3.8.2.1.8 Lantai 11 M2 230,59
3.8.2.1.9 Lantai 12 M2 242,36
3.8.2.1.10 Lantai 13 M2 249,06
3.8.2.1.11 Lantai 14 M2 67,13

Plafond gypsum tebal 9 mm termasuk rangka Hollow, Pada Kamar ( Foyer


3.8.2.2
accesories dan perlengkapan lainnya )
3.8.2.2.1 Lantai 4 M2 61,55
3.8.2.2.2 Lantai 5 M2 65,44
3.8.2.2.3 Lantai 6 M2 61,55
3.8.2.2.4 Lantai 7 M2 65,44
3.8.2.2.5 Lantai 8 M2 61,55
3.8.2.2.6 Lantai 9 M2 65,44
3.8.2.2.7 Lantai 10 M2 61,55
3.8.2.2.8 Lantai 11 M2 65,44
3.8.2.2.9 Lantai 12 M2 66,10
3.8.2.2.10 Lantai 13 M2 70,03
3.8.2.2.11 Lantai 14 M2 18,40

Plafond gypsum WR tebal 10 mm termasuk rangka


3.8.2.3 Pada Toilet Kamar
Hollow accesories dan perlengkapan lainnya
3.8.2.3.1 Lantai 4 M2 57,58
3.8.2.3.2 Lantai 5 M2 57,58
3.8.2.3.3 Lantai 6 M2 57,58
3.8.2.3.4 Lantai 7 M2 57,58
3.8.2.3.5 Lantai 8 M2 57,58
3.8.2.3.6 Lantai 9 M2 57,58
3.8.2.3.7 Lantai 10 M2 57,58
3.8.2.3.8 Lantai 11 M2 57,58
3.8.2.3.9 Lantai 12 M2 45,20
3.8.2.3.10 Lantai 13 M2 45,20
3.8.2.3.11 Lantai 14 M2 17,01

Plafond gypsum tebal 9 mm termasuk rangka Hollow,


3.8.2.4 Pada Koridor
accesories dan perlengkapan lainnya
3.8.2.4.1 Lantai 4 M2 80,21
3.8.2.4.2 Lantai 5 M2 80,21
3.8.2.4.3 Lantai 6 M2 80,21
3.8.2.4.4 Lantai 7 M2 80,21
3.8.2.4.5 Lantai 8 M2 80,21
3.8.2.4.6 Lantai 9 M2 80,21
3.8.2.4.7 Lantai 10 M2 80,21
3.8.2.4.8 Lantai 11 M2 80,21
3.8.2.4.9 Lantai 12 M2 80,21
3.8.2.4.10 Lantai 13 M2 80,21

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 37
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.8.2.4.11 Lantai 14 M2 110,93

Plafond gypsum tebal 9 mm termasuk rangka Hollow, R. Mesin Lift Tower


3.8.2.5 M2 8,00
accesories dan perlengkapan lainnya 2

Plafond gypsum tebal 9 mm termasuk rangka Hollow,


3.8.2.6 Lantai 14 M2 101,85
accesories dan perlengkapan lainnya

Drop ceiling gypsum tebal 9 mm h=550 mm termasuk


3.8.2.7 Pada are kamar
rangka full system, accesories dan perlengkapan lainnya
3.8.2.7.1 Lantai 4 M 215,20
3.8.2.7.2 Lantai 5 M 215,20
3.8.2.7.3 Lantai 6 M 215,20
3.8.2.7.4 Lantai 7 M 215,20
3.8.2.7.5 Lantai 8 M 215,20
3.8.2.7.6 Lantai 9 M 215,20
3.8.2.7.7 Lantai 10 M 215,20
3.8.2.7.8 Lantai 11 M 215,20
3.8.2.7.9 Lantai 12 M 166,20
3.8.2.7.10 Lantai 13 M 165,95
3.8.2.7.11 Lantai 14 M 165,95

Drop ceiling gypsum tebal 9 mm h=100 mm termasuk


3.8.2.8 rangka full system, accsesories dan perlengkapan Pada area koridor
lainnya
3.8.2.8.1 Lantai 4 M 55,50
3.8.2.8.2 Lantai 5 M 55,50
3.8.2.8.3 Lantai 6 M 55,50
3.8.2.8.4 Lantai 7 M 55,50
3.8.2.8.5 Lantai 8 M 55,50
3.8.2.8.6 Lantai 9 M 55,50
3.8.2.8.7 Lantai 10 M 55,50
3.8.2.8.8 Lantai 11 M 55,50
3.8.2.8.9 Lantai 12 M 55,50
3.8.2.8.10 Lantai 13 M 55,50
3.8.2.8.11 Lantai 14 M 55,50

3.8.2.9 Shadow line termasuk perapihan Pada Kamar


3.8.2.9.1 Lantai 4 M 247,00
3.8.2.9.2 Lantai 5 M 250,75
3.8.2.9.3 Lantai 6 M 247,00
3.8.2.9.4 Lantai 7 M 250,75
3.8.2.9.5 Lantai 8 M 247,00
3.8.2.9.6 Lantai 9 M 250,75
3.8.2.9.7 Lantai 10 M 247,00
3.8.2.9.8 Lantai 11 M 250,75
3.8.2.9.9 Lantai 12 M 222,40
3.8.2.9.10 Lantai 13 M 226,40
3.8.2.9.11 Lantai 14 M 214,12

3.8.2.10 Shadow line termasuk perapihan Pada Kamar (Foyer)


3.8.2.10.1 Lantai 4 M 115,06
3.8.2.10.2 Lantai 5 M 118,81
3.8.2.10.3 Lantai 6 M 115,06
3.8.2.10.4 Lantai 7 M 118,81
3.8.2.10.5 Lantai 8 M 115,06
3.8.2.10.6 Lantai 9 M 118,81
3.8.2.10.7 Lantai 10 M 115,06
3.8.2.10.8 Lantai 11 M 118,81
3.8.2.10.9 Lantai 12 M 118,80
3.8.2.10.10 Lantai 13 M 124,05
3.8.2.10.11 Lantai 14 M 37,18

3.8.2.11 Shadow line termasuk perapihan Pada Koridor


3.8.2.11.1 Lantai 4 M 102,89
3.8.2.11.2 Lantai 5 M 102,89
3.8.2.11.3 Lantai 6 M 102,89
3.8.2.11.4 Lantai 7 M 102,89
3.8.2.11.5 Lantai 8 M 102,89

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 38
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.8.2.11.6 Lantai 9 M 102,89
3.8.2.11.7 Lantai 10 M 102,89
3.8.2.11.8 Lantai 11 M 102,89
3.8.2.11.9 Lantai 12 M 102,89
3.8.2.11.10 Lantai 13 M 102,89
3.8.2.11.11 Lantai 14 M 90,86

3.8.2.12 Shadow line termasuk perapihan R. Mesin Lift M 12,00

3.8.3 CURTAIN BOX

3.8.3.1 Curtain Box unit 162,00


Pada kamar

3.8.3.2 Pekerjaan Indirect Light


3.8.3.2.1 Koridor M' 960,00
3.8.3.2.2 Ruang Meeting M' 384,00
3.8.3.2.3 Prefunction M' 32,00
3.8.3.2.4 Lobbby M' 128,00
3.8.3.2.5 Lantai 14 M' 72,00
3.8.3.2.6 Kamar Mandi M' 330,00

SUB TOTAL PEKERJAAN PLAFOND

3.8.1 PUBLIC AREA


3.8.2 UNIT HOTEL & APARTEMENT
3.8.3 CURTAIN BOX

3.9 SUB PEKERJAAN CAT

3.9.1 EXSTRA BIAYA PERAPIHAN BETON EXPOSED


PUBLIC AREA

3.9.1.1 Ekstra perapihan dengan skim coat pada beton ekspose M2 5.634,80
Pada Parkir Area

3.9.1.2 Ekstra perapihan dengan skim coat pada beton ekspose M2 350,83
Pada R. ME

3.9.1.3 Ekstra perapihan dengan skim coat pada beton ekspose M2 343,69
Pada Ramp

3.9.1.4 Ekstra perapihan dengan skim coat pada beton ekspose Pada Bawah & Sisi samping Tangga
3.9.1.4.1 Lt. Basement M2 77,86
3.9.1.4.2 Lantai 1 M2 50,06
3.9.1.4.3 Lantai 2 M2 51,06
3.9.1.4.4 Lantai 3 M2 50,06
3.9.1.4.5 Lantai 4 M2 27,84
3.9.1.4.6 Lantai 5 M2 40,84
3.9.1.4.7 Lantai 6 M2 40,84
3.9.1.4.8 Lantai 7 M2 40,84
3.9.1.4.9 Lantai 8 M2 40,84
3.9.1.4.10 Lantai 9 M2 40,84
3.9.1.4.11 Lantai 10 M2 40,84
3.9.1.4.12 Lantai 11 M2 40,84
3.9.1.4.13 Lantai 12 M2 40,84
3.9.1.4.14 Lantai 13 M2 40,84
3.9.1.4.15 Lantai 14 M2 42,76

3.9.1.5 Ekstra perapihan dengan skim coat pada beton ekspose Pada Kolom & Shearwall
3.9.1.5.1 Lt. Basement M2 283,53
3.9.1.5.2 Lantai 1 ( Tower 1 ) M2 283,53
3.9.1.5.3 Lantai 2 ( Tower 1 ) M2 141,77

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 39
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.9.1.5.4 Lantai 3 ( Tower 1 ) M2 141,77
3.9.1.5.5 Lantai 4 ( Tower 1 ) M2 99,59
3.9.1.5.6 Lantai 5 ( Tower 1 ) M2 99,59
3.9.1.5.7 Lantai 6 M2 95,45
3.9.1.5.8 Lantai 7 M2 95,45
3.9.1.5.9 Lantai 8 M2 95,45
3.9.1.5.10 Lantai 9 M2 95,45
3.9.1.5.11 Lantai 10 M2 89,77
3.9.1.5.12 Lantai 11 M2 89,77
3.9.1.5.13 Lantai 12 M2 115,38
3.9.1.5.14 Lantai 13 M2 89,77
3.9.1.5.15 Lantai 14 M2 70,52
3.9.1.5.16 Lantai Atap M2 41,69

3.9.2 PEKERJAAN PENGECATAN

3.9.2.1 Cat Eksterior Wheatersheiel ex …. termasuk perapihan Lt. Bs s/d Atap M2 6.657,43
Pada Dinding Luar

Cat Interior Emulsion waterbase ex ...termasuk


3.9.2.2 Lt. Bs s/d Atap M2 ########
perapihan
Pada Dinding dalam

3.9.2.3 Cat Eksterior Wheatersheiel ex …. termasuk perapihan M2 1.336,27


Pada Parapet

Cat Interior Emulsion waterbase ex ...termasuk


3.9.2.4
perapihan
Pada Plafond Public Area
3.9.2.4.1 Lobby Lift Lt. Bs s/d 14 M2 261,50
3.9.2.4.2 Toilet Pria & Wanita ( Public ) Lt. Bs s/d 3 M2 258,46
3.9.2.4.3 Public Area Lt. Bs s/d 3 M2 2.205,69
3.9.2.4.4 Drop Ceilling h = 200 mm Lobby Lift M2 44,75
3.9.2.4.5 Drop Ceilling h = 200 mm M2 84,66
3.9.2.4.6 Drop Ceilling h = 300 mm M2 114,27

3.9.2.5 Pada Plafond Hotel & Apartemen


3.9.2.5.1 Kamar Lt. 4 s/d 14 M2 2.378,61
3.9.2.5.2 Foyer Lt. 4 s/d 14 M2 662,49
3.9.2.5.3 Toilet Kamar Lt. 4 s/d 14 M2 568,05
3.9.2.5.4 Koridor Lt. 4 s/d 14 M2 913,03
3.9.2.5.5 R. Mesin Lift Atap M2 568,05
3.9.2.5.6 Drop Ceilling h = 550 mm M2 2.219,70
3.9.2.5.7 Drop Ceilling h = 100 mm M2 610,50

Cat Interior Emulsion waterbase ex ...termasuk


3.9.2.6
perapihan
3.9.2.6.1 Pada Parkir Area M2 5.634,80
3.9.2.6.2 Pada R. ME M2 350,83
3.9.2.6.3 Pada Bawah Ramp M2 343,69
3.9.2.6.4 Pada Bawah & Sisi samping Tangga M2 586,89
3.9.2.6.5 Pada Kolom & Shearwall M2 1.928,48

SUB TOTAL PEKERJAAN CAT

3.9.1 EXSTRA BIAYA PERAPIHAN BETON EXPOSED


3.9.2 PEKERJAAN PENGECATAN

3.10 SUB PEKERJAAN LAIN - LAIN

3.10.1 PUBLIC AREA


Ralling steel tinggi 1200mm dengan Tiang steel Railling
3.10.1.1 75 x 5 mm, termasuk fixing , accessories dan M 14,00
perlengkapan lainnya.
Pada Outdoor Terrace Lt.2

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 40
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Kolam Renang &
3.10.1.2 Railing Balustrade pada kolam renang & Water Feature M2 73,00
Water Feature

3.10.1.3 Dinding Treatment Water Feature M2 216,00

3.10.1.4 Dinding Treatment pada Kolam Renang Lantai 14 M2 56,00

3.10.1.5 Railing Balustrade Lantai 14 M2 60,00

3.10.1.6 Cat pembatas parkir lebar 100 mm Lt. Basement M 691,00


Pada Area Parkir Lantai 1 M 149,00

3.10.1.7 Cat petunjuk arah (traffic arrow) Lt. Basement Bh 30,00


Pada Area Parkir Lantai 1 Bh 25,00

Car stopper beton ukuran 150x200x400 mm termasuk


3.10.1.8 Lt. Basement Bh 54,00
angkur dan perlengkapan lainnya
Pada Area Parkir Lantai 1 Bh 29,00

Corner protection terbuat dari bisi L 50.50.5 h=1000mm


3.10.1.9 pada kolom termasuk angkur dan finish cat minyak dan Pada Area Parkir
perlengkapan lainnya
3.10.1.9.1 Lt. Basement Bh 90,00
3.10.1.9.2 Lantai 1 Bh 90,00

3.10.1.10 Cat minyak ex… termasuk perapihan Lt. Basement M2 336,00


Pada Kolom Area Parkir

Grill penutup saluran ukuran lebar 300mm terbuat dari


3.10.1.11 besi galvanis siku 50x50x5 mm dan plat strip tebal 5 mm Pada Ramp Area Parkir
termasuk angkur dan perlengkapan lainnya.
3.10.1.11.1 Lt. Basement M 39,50
3.10.1.11.2 Lantai 1 M 6,00

Kanstin beton ukuran 150x200x400 mm termasuk


3.10.1.12 Lt. Basement M 389,61
angkur dan perapihan
Pada Area Parkir

Penebalan dinding urinal dari pasangan bata ringan


3.10.1.13
tebal 150 mm adukan drymix system.
3.10.1.13.1 Lt. Basement M2 11,01
3.10.1.13.2 Lantai 1 M2 3,15
3.10.1.13.3 Lantai 2 M2 3,15
3.10.1.13.4 Lantai 3 M2 3,60

Top table diatas penebalan dinding urinoir dengan


3.10.1.14 granite lebar 150mm adukan drymix system termasuk
pinggulan, accessories dan perlengkapan lainnya.
3.10.1.14.1 Lt. Basement M 7,34
3.10.1.14.2 Lantai 1 M 2,10
3.10.1.14.3 Lantai 2 M 2,10
3.10.1.14.4 Lantai 3 M 2,40

Kaca cermin 5mm dibevel kelling termasuk backing


3.10.1.15 plywood 9mm, list profil, accsesories dan perlengkapan
lainnya
3.10.1.15.1 Lt. Basement M2 12,30
3.10.1.15.2 Lantai 1 M2 4,23
3.10.1.15.3 Lantai 2 M2 4,23
3.10.1.15.4 Lantai 3 M2 6,17

Partisi kubikal toilet HPL laminated termasuk tiang


3.10.1.16 support, fixing, hardware, accessories dan perlengkapan
lainnya
3.10.1.16.1 Lt. Basement M2 67,54
3.10.1.16.2 Lantai 1 M2 23,48
3.10.1.16.3 Lantai 2 M2 23,48
3.10.1.16.4 Lantai 3 M2 26,34

3.10.1.17 Meja Solid Surface + Konstruksi Besi


3.10.1.17.1 Lt. Basement M 11,28

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 41
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.10.1.17.2 Lantai 1 M 4,03
3.10.1.17.3 Lantai 2 M 4,03
3.10.1.17.4 Lantai 3 M 5,88

Railing pipa blacksteel tinggi 1100mm dengan handrail


pipa diameter 3 inchi, tiang dan pipa horizontal pipa
3.10.1.18 Pada Tangga Kebakaran
blacksteel, finishing cat duco termasuk accessories dan
perlengkapan lainnya.
3.10.1.18.1 Lt. Basement M 21,00
3.10.1.18.2 Lantai 1 M 18,00
3.10.1.18.3 Lantai 2 M 16,00
3.10.1.18.4 Lantai 3 M 16,00
3.10.1.18.5 Lantai 4 M 16,00
3.10.1.18.6 Lantai 5 M 16,00
3.10.1.18.7 Lantai 6 M 16,00
3.10.1.18.8 Lantai 7 M 16,00
3.10.1.18.9 Lantai 8 M 16,00
3.10.1.18.10 Lantai 9 M 16,00
3.10.1.18.11 Lantai 10 M 16,00
3.10.1.18.12 Lantai 11 M 16,00
3.10.1.18.13 Lantai 12 M 16,00
3.10.1.18.14 Lantai 13 M 16,00
3.10.1.18.15 Lantai 14 M 16,00
3.10.1.18.16 Lantai Atap M 2,80

Fire stop sesuai dengan spesifikasi termasuk


3.10.1.18 Pada Lubang Shaft
accessories dan perlengkapan lainnya.
3.10.1.18.1 Lantai 1 M2 7,20
3.10.1.18.2 Lantai 2 M2 6,00
3.10.1.18.3 Lantai 3 M2 6,00
3.10.1.18.4 Lantai 4 M2 12,00
3.10.1.18.5 Lantai 5 M2 12,00
3.10.1.18.6 Lantai 6 M2 12,00
3.10.1.18.7 Lantai 7 M2 12,00
3.10.1.18.8 Lantai 8 M2 12,00
3.10.1.18.9 Lantai 9 M2 12,00
3.10.1.18.10 Lantai 10 M2 12,00
3.10.1.18.11 Lantai 11 M2 12,00
3.10.1.18.12 Lantai 12 M2 12,00
3.10.1.18.13 Lantai 13 M2 12,00
3.10.1.18.14 Lantai 14 M2 12,00
3.10.1.18.15 Lantai Atap M2 12,00

3.10.2 HOTEL & APARTEMENT

Kaca cermin 5mm dibevel kelling termasuk backing


3.10.2.1 plywood 9mm, list profil, accsesories dan perlengkapan Pada Toilet
lainnya
3.10.2.1.1 Lantai 4 M2 19,32
3.10.2.1.2 Lantai 5 M2 19,32
3.10.2.1.3 Lantai 6 M2 19,32
3.10.2.1.4 Lantai 7 M2 19,32
3.10.2.1.5 Lantai 8 M2 19,32
3.10.2.1.6 Lantai 9 M2 19,32
3.10.2.1.7 Lantai 10 M2 19,32
3.10.2.1.8 Lantai 11 M2 19,32
3.10.2.1.9 Lantai 12 M2 16,59
3.10.2.1.10 Lantai 13 M2 16,85
3.10.2.1.11 Lantai 14 M2 7,34

Partisi Kaca tempered tebal 10 mm termasuk support,


3.10.2.2 Pada Toilet
fixing, accessories dan perlengkapan lainnya
3.10.2.2.1 Lantai 4 M2 25,60
3.10.2.2.2 Lantai 5 M2 25,60
3.10.2.2.3 Lantai 6 M2 25,60
3.10.2.2.4 Lantai 7 M2 25,60
3.10.2.2.5 Lantai 8 M2 25,60
3.10.2.2.6 Lantai 9 M2 25,60
3.10.2.2.7 Lantai 10 M2 25,60
3.10.2.2.8 Lantai 11 M2 25,60
3.10.2.2.9 Lantai 12 M2 19,20

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 42
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.10.2.2.10 Lantai 13 M2 19,20

Partisi Kaca dan pintu dengan kaca tempered tebal 10


3.10.2.3 mm termasuk support, fixing, hardware , accessories Lantai 14 M2 11,10
dan perlengkapan lainnya
Pada Toilet

Partisi Kaca tempered tebal 10 mm termasuk support,


3.10.2.4 Show kitchen Lt.2 M2 47,65
fixing, accessories dan perlengkapan lainnya

3.10.2.5 Meja Solid Surface + Konstruksi Besi


3.10.2.5.1 Lantai 4 M 18,40
3.10.2.5.2 Lantai 5 M 18,40
3.10.2.5.3 Lantai 6 M 18,40
3.10.2.5.4 Lantai 7 M 18,40
3.10.2.5.5 Lantai 8 M 18,40
3.10.2.5.6 Lantai 9 M 18,40
3.10.2.5.7 Lantai 10 M 18,40
3.10.2.5.8 Lantai 11 M 18,40
3.10.2.5.9 Lantai 12 M 15,80
3.10.2.5.10 Lantai 13 M 16,05
3.10.2.5.11 Lantai 14 M 6,99

3.10.2.6 Meja Solid Surface + Konstruksi Besi


3.10.2.6.1 Lantai 2 M 18,00
3.10.2.6.2 Lantai 14 M 5,00

3.10.3 WINDOWS STOOL


3.10.3.1 Rangka hollow sound proof finished ACP M' 230,00

3.10.4 SCREEN AC

3.10.4.1 Besi Lantai 4 - 14 unit 96,00


Pada Balkon

3.10.5 KACA SKY LIGHT

3.10.5.1 Atap kaca Laminated tebal 12 mm Lantai 2 & 14 M2 210,00


3.10.5.2 Dudukan kaca laminated dari Hollow 50x100 mm Lantai 2 & 14 M2 210,00
3.10.5.3 Pekerjaan GRC tutup WF
3.10.5.3.1 Lantai 2 M2 94,00
3.10.5.3.2 Lantai 14 M2 44,00
3.10.5.4 Bomb Check Lantai 1 ls 1,00

SUB TOTAL PEKERJAAN LAIN - LAIN

3.10.1 PUBLIC AREA

3.10.2 HOTEL & APARTEMENT

3.10.3 WINDOWS STOOL

3.10.4 SCREEN AC

3.10.5 KACA SKY LIGHT

3.11 SUB PEKERJAAN SANITARY

3.11.1 PUBLIC AREA

3.11.1.1 Toilet # 01 Lockers Pria & Wanita Lt. Basement


3.11.1.1.1 Closet Duduk ex. American Standart Type B102CAxxK Set 4,00
3.11.1.1.2 Lavatory ex. American Standart Type YAA4J6C10 Set 6,00
3.11.1.1.3 Paper Holder ex. American Standart Type F020A032 Set 4,00
3.11.1.1.4 Shower Spray ex. American Standart Type F074H002 Set 4,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 43
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.11.1.1.5 Floor Drain ex. American Standart Type F030A261 Set 9,00
3.11.1.1.6 Head Shower ex. American Standart Type F048Z001 Set 5,00
3.11.1.1.7 Will Built In Showet ex. American Standart Type F082E073 Set 5,00
3.11.1.1.8 Urinoir ex. American Standart Type WM01UXXK Set 6,00
3.11.1.1.9 Urinoir Partition ex. American Standart Type DV01UAXXK Set 6,00
3.11.1.1.10 Robe Hook ex. American Standart Type F068A282 Set 9,00

3.11.1.2 Toilet # 02 StafF Pria & Wanita Lt. Basement


3.11.1.2.1 Closet Duduk ex. American Standart Type B102CAxxK Set 6,00
3.11.1.2.2 Lavatory ex. American Standart Type YAA4J6C10 Set 5,00
3.11.1.2.3 Paper Holder ex. American Standart Type F020A032 Set 6,00
3.11.1.2.4 Shower Spray ex. American Standart Type F074H002 Set 6,00
3.11.1.2.5 Floor Drain ex. American Standart Type F030A261 Set 5,00
3.11.1.2.6 Urinoir ex. American Standart Type WM01UXXK Set 2,00
3.11.1.2.7 Urinoir Partition ex. American Standart Type DV01UAXXK Set 2,00
3.11.1.2.8 Robe Hook ex. American Standart Type F068A282 Set 6,00

3.11.1.3 Toilet # 03 Driver & Wudhu Lt. Basement


3.11.1.3.1 Closet Duduk ex. American Standart Type WAQ3YJC10-A Set 2,00
3.11.1.3.2 Lavatory ex. American Standart Type LAU3T8XX Set 1,00
3.11.1.3.3 Paper Holder ex. American Standart Type F020A032 Set 2,00
3.11.1.3.4 Shower Spray ex. American Standart Type F074H002 Set 2,00
3.11.1.3.5 Floor Drain ex. American Standart Type F030A261 Set 4,00
3.11.1.3.6 Urinoir ex. American Standart Type WM01UXXK Set 1,00
3.11.1.3.7 Robe Hook ex. American Standart Type F068A282 Set 2,00
3.11.1.3.8 Kran Air ex. American Standart Type FO82G102 Set 6,00

3.11.1.4 Toilet # 03 A R. Serbaguna Lt. Basement


3.11.1.4.1 Closet Duduk ex. American Standart Type B102CAxxK Set 2,00
3.11.1.4.2 Lavatory ex. American Standart Type OV02YAxxK Set 1,00
3.11.1.4.3 Paper Holder ex. American Standart Type F020A032 Set 2,00
3.11.1.4.4 Shower Spray ex. American Standart Type F074H002 Set 2,00
3.11.1.4.5 Floor Drain ex. American Standart Type F030A261 Set 3,00
3.11.1.4.6 Robe Hook ex. American Standart Type F068A282 Set 2,00

3.11.1.5 Toilet # 04 & #06 Publik Pria & Wanita Lt. 1 & 2 ( Tower 1 )
3.11.1.5.1 Closet Duduk ex. American Standart Type B102CAxxK Set 10,00
3.11.1.5.2 Lavatory ex. American Standart Type YAA4J6C10 Set 10,00
3.11.1.5.3 Paper Holder ex. American Standart Type F020A032 Set 10,00
3.11.1.5.4 Shower Spray ex. American Standart Type F074H002 Set 10,00
3.11.1.5.5 Floor Drain ex. American Standart Type F030A261 Set 10,00
3.11.1.5.6 Urinoir ex. American Standart Type WM01UAXXK Set 6,00
3.11.1.5.7 Urinoir Partition ex. American Standart Type DV01UAXXK Set 6,00
3.11.1.5.8 Robe Hook ex. American Standart Type F068A282 Set 10,00

3.11.1.6 Toilet # 05 A Pool Deck


3.11.1.6.1 Closet Duduk ex. American Standart Type B102CAxxK Set 2,00
3.11.1.6.2 Lavatory ex. American Standart Type YAA4J6C10 Set 1,00
3.11.1.6.3 Paper Holder ex. American Standart Type F020A032 Set 2,00
3.11.1.6.4 Shower Spray ex. American Standart Type F074H002 Set 2,00
3.11.1.6.5 Floor Drain ex. American Standart Type F030A261 Set 3,00
3.11.1.6.6 Urinoir ex. American Standart Type WM01UAXXK Set 2,00
3.11.1.6.7 Robe Hook ex. American Standart Type F068A282 Set 2,00

3.11.1.7 Toilet # 08 Publik Pria & Wanita Lt. 3 ( Tower 1 )


3.11.1.7.1 Closet Duduk ex. American Standart Type B102CAxxK Set 6,00
3.11.1.7.2 Lavatory ex. American Standart Type YAA4J6C10 Set 5,00
3.11.1.7.3 Paper Holder ex. American Standart Type F020A032 Set 6,00
3.11.1.7.4 Shower Spray ex. American Standart Type F074H002 Set 6,00
3.11.1.7.5 Floor Drain ex. American Standart Type F030A261 Set 6,00
3.11.1.7.6 Urinoir ex. American Standart Type WM01UAXXK Set 3,00
3.11.1.7.7 Urinoir Partition ex. American Standart Type DV01UAXXK Set 3,00
3.11.1.7.8 Robe Hook ex. American Standart Type F068A282 Set 6,00

3.11.2 HOTEL & APARTEMEN

3.11.2.1 Toilet # 10 Lantai 4 s/d 11 ( Hotel )


3.11.2.1.1 Closet Duduk ex. American Standart Type NM02CA10K Set 128,00
3.11.2.1.2 Lavatory ex. American Standart Type YAA4J6C10 Set 128,00
3.11.2.1.3 Paper Holder ex. American Standart Type F020A032 Set 128,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 44
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
3.11.2.1.4 Shower Spray ex. American Standart Type F074H002 Set 128,00
3.11.2.1.5 Floor Drain ex. American Standart Type F030A261 Set 256,00
3.11.2.1.6 Head Shower ex. American Standart Type F048Z001 Set 128,00
3.11.2.1.7 Will Built In Showet ex. American Standart Type F082E073 Set 128,00
3.11.2.1.8 Robe Hook ex. American Standart Type F068A282 Set 128,00
3.11.2.1.9 Round Double Bar ex. American Standart Type F068A112 Set 128,00

3.11.2.2 Toilet # 11 Lantai 12 & 13 ( Hotel )


3.11.2.2.1 Closet Duduk ex. American Standart Type NM02CA10K Set 7,00
3.11.2.2.2 Lavatory ex. American Standart Type YAA4J6C10 Set 7,00
3.11.2.2.3 Paper Holder ex. American Standart Type F020A032 Set 7,00
3.11.2.2.4 Shower Spray ex. American Standart Type F074H002 Set 7,00
3.11.2.2.5 Floor Drain ex. American Standart Type F030A261 Set 14,00
3.11.2.2.6 Head Shower ex. American Standart Type F048Z001 Set 7,00
3.11.2.2.7 Will Built In Showet ex. American Standart Type F082E073 Set 7,00
3.11.2.2.8 Robe Hook ex. American Standart Type F068A282 Set 7,00
3.11.2.2.9 Round Double Bar ex. American Standart Type F068A112 Set 7,00

3.11.2.3 Toilet # 11A Lantai 12 & 13 ( Apartement )


3.11.2.3.1 Closet Duduk ex. American Standart Type NM02CA10K Set 17,00
3.11.2.3.2 Lavatory ex. American Standart Type YAA4J6C10 Set 17,00
3.11.2.3.3 Paper Holder ex. American Standart Type F020A032 Set 17,00
3.11.2.3.4 Shower Spray ex. American Standart Type F074H002 Set 17,00
3.11.2.3.5 Floor Drain ex. American Standart Type F030A261 Set 34,00
3.11.2.3.6 Head Shower ex. American Standart Type F048Z001 Set 17,00
3.11.2.3.7 Will Built In Showet ex. American Standart Type F082E073 Set 17,00
3.11.2.3.8 Robe Hook ex. American Standart Type F068A282 Set 17,00
3.11.2.3.9 Round Double Bar ex. American Standart Type F068A112 Set 17,00

3.11.2.4 Toilet # 12 Lantai 14 ( Apartement )


3.11.2.4.1 Closet Duduk ex. American Standart Type NM02CA10K Set 5,00
3.11.2.4.2 Lavatory ex. American Standart Type YAA4J6C10 Set 5,00
3.11.2.4.3 Paper Holder ex. American Standart Type F020A032 Set 5,00
3.11.2.4.4 Shower Spray ex. American Standart Type F074H002 Set 5,00
3.11.2.4.5 Floor Drain ex. American Standart Type F030A261 Set 8,00
3.11.2.4.6 Head Shower ex. American Standart Type F048Z001 Set 3,00
3.11.2.4.7 Will Built In Showet ex. American Standart Type F082E073 Set 3,00
3.11.2.4.8 Robe Hook ex. American Standart Type F068A282 Set 5,00
3.11.2.4.9 Round Double Bar ex. American Standart Type F068A112 Set 3,00

3.11 SUB TOTAL PEKERJAAN SANITARY

3.11.1 PUBLIC AREA


3.11.2 HOTEL & APARTEMEN

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 3 : PEKERJAAN ARSITEKTUR - TAHAP 1
HALAMAN : 45
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

REKAPITULASI TOTAL PENJUMLAHAN SUB PEKERJAAN ARSITEKTUR

3.1 SUB TOTAL PEKERJAAN DINDING


3.2 SUB TOTAL PEKERJAAN PLESTERAN + ACIAN
3.3 SUB TOTAL PEKERJAAN TAMPAK LUAR ( FAÇADE )
3.4 SUB TOTAL PEKERJAAN SCREEDING
3.5 SUB TOTAL PEKERJAAN DI LUAR BANGUNAN
3.6 SUB PEKERJAAN PINTU & JENDELA
3.7 SUB PEKERJAAN PELAPIS DINDING
3.8 SUB PEKERJAAN PLAFOND
3.9 SUB PEKERJAAN CAT
3.10 SUB PEKERJAAN LAIN - LAIN
3.11 SUB PEKERJAAN SANITARY

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN ARSITEKTUR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 46
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1 SUB TOTAL PEKERJAAN PLUMBING

4.1.1 PERALATAN UTAMA

Pompa Air Bersih (TP-01 & TP-02), type centrifugal end


suction kapasitas 400 LPM, tekanan 5 bar, daya listrik
4.1.1.1 5.5 kW/380/3ph/50Hz, termasuk valve-valve, panel Ebara unit 4
kontrol dan pengkabelannya, vibration mounting beserta
perlengkapannya sesuai gambar dan spesifikasi.

Pompa Packaged Booster (PB-1 & PB-2), type


centrifugal end suction, kapasitas 250 LPM, tekanan 2
bar, daya listrik 1.5 kW/380/3ph/50Hz, termasuk
4.1.1.2 Variable Speed Drive, header valve-valve, panel kontrol Ebara Unit 2
dan pengkabelannya, vibration mounting , pressure tank
dan pengkabelannya, lokasi lantai atap, 1 set terdiri dari
2 unit pompa.

Seewagepit Pump (PSP B1.1- PSP B1.2), type


submersible non clog, kapasitas 1500 L/menit, head 10
M, , daya listrik 3.7 KW 380v/3ph/50Hz, lengkap dengan
4.1.1.3 Ebara set 6
Panel Control dan pengkabelannya, QDC + Lifting chain,
levelswitch , valve-valve sesuai gambar dan spesifikasi.
(provisional)

Seewagepit Pump (PSP B1.1- PSP B1.2), type


submersible , kapasitas 500 L/menit, head 10 M, , daya
listrik 0.15 KW 380v/3ph/50Hz, lengkap dengan Panel
4.1.1.4 Ebara set 14
Control dan pengkabelannya, QDC + Lifting chain,
levelswitch , valve-valve sesuai gambar dan spesifikasi.
(provisional)

Pompa Filter (FP-01 & FP-02), type centrifugal end


suction kapasitas 130 LPM, tekanan 1.2 bar, daya listrik
4.1.1.5 1.2 kW/380/3ph/50Hz, termasuk valve-vale, panel Ebara unit 2
kontrol dan pengkabelannya, vibration mounting beserta
perlengkapannya sesuai gambar dan spesifikasi.

Sand Filter SF.B-1 , type manual back wash, laju aliran


133 LPM , working pressure 5 Kg/cm2, body FRP,
4.1.1.6 Jetmax set 1
material lengkap dengan manhole, pasir silika , valve-
valve dan accessoris lainnya.

Carbon Filter CF.B-1 , type manual back wash, laju


aliran 133 LPM , working pressure 5 kg/cm2, media
4.1.1.7 Jetmax set 1
granular carbon aktif, body FRP, material lengkap
dengan manhole, valve-valve dan accessoris lainnya.

4.1.1.8 Chiller Onzene Local unit 1

FRP (Roof Tank) @(2 x 3 x 2.5 M), 7 m3 effective,


dilengkapi tangga monyet luar (bahan galvanized),
tangga monyet dalam (bahan stainless steel) , termasuk
4.1.1.9 Local set 3
valve-valve, pipa vent, level indicator, serta alat bantu
dan perlengkapan lain sesuai gambar dan spesifikasi
teknis (lokasi di lantai atap).`

4.1.1.10 Heat Pump 10PK Local unit 3


4.1.1.11 Tanki Air Panas 5m3 Local unit 1
Pompa Packaged Booster (PB-1 & PB-2), type
centrifugal end suction, kapasitas 250 LPM, tekanan 2
bar, daya listrik 1.5 kW/380/3ph/50Hz, termasuk
4.1.1.12 Variable Speed Drive, header valve-valve, panel kontrol Ebara unit 2
dan pengkabelannya, vibration mounting , pressure tank
dan pengkabelannya, lokasi lantai atap, 1 set terdiri dari
2 unit pompa.

Pekerjaan Sistem Deep well termasuk pengadaan dan


pemasangan pompa deep well type Submersible Pump,
kapasitas 150 LPM, kedalaman 60 M, daya listrik 2.7
kW/380V/3ph/50Hz., Automatic by LS c/w Panel kontrol,
4.1.1.13 Franklin Ls 0
kabel power & feeder instalasi pemipaan, screen, bak
kontrol, water meter air, valve-valve, lengkap dengan
bak kontrol sumur dan water meter, ijin-ijin pihak
berwenang, sampai dengan sistem bekerja dengan baik.

4.1.2 PEMIPAAN RUANG POMPA

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 47
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.2.1 DARI TITIK DEEP WELL KE GROUND TANK


Area Ruang Pompa
4.1.2.1.1 Polypropylene Random (PPR) PN - 10
4.1.2.1.1.1 Pipa diameter 50 mm Westpex M 7
4.1.2.1.1.2 Floater valve diameter 50 mm 10 K Kitz bh 2
4.1.2.1.1.3 Gate valve diameter 50 mm 10 K Kitz bh 2
4.1.2.1.1.4 Check valve diameter 50 mm 10 K Kitz bh 1
4.1.2.1.1.5 Fitting dan assesories Westpex Ls 0
4.1.2.1.1.6 Alat bantu dan material batu Ls 0

4.1.2.2 DARI TITIK WATER METER PDAM KE GROUND TANK


Area Ruang Pompa
4.1.2.2.1 Polypropylene Random (PPR) PN - 10
4.1.2.2.1.1 Pipa diameter 50 mm Westpex M 13
4.1.2.2.1.2 Fitting diameter 50 mm Westpex bh 10
4.1.2.2.1.3 Floater valve diameter 50 mm 10 K Kitz bh 2
4.1.2.2.1.4 Water Meter diameter 50 mm Actaris bh 1
4.1.2.2.1.5 Gate valve diameter 50 mm 10K Kitz bh 1
Bak kontrol PDAM dengan ukuran menyesuaikan
4.1.2.2.1.6 bh 1
equipment ME di dalamnya
4.1.2.2.1.7 Fitting dan assesories Westpex Ls 0
4.1.2.2.1.8 Alat bantu dan material batu Ls 0

4.1.2.3 PEMIPAAN POMPA TRANSFER AIR BERSIH


Area Ruang Pompa
4.1.2.3.1 Gavlvanis Iron Pipe (GIP) medium Class
4.1.2.3.1.1 Header diameter 100 mm Spindo set 4
4.1.2.3.1.2 Pipa diameter 65mm Spindo set 1
4.1.2.3.1.3 Pipa diameter 50mm Spindo set 1
4.1.2.3.1.4 Fitting dan assesories Galunggung Ls 1
4.1.2.3.1.5 Alat bantu dan material batu Ls 1

4.1.2.4 KATUP-KATUP POMPA TRANSFER

4.1.2.4.1 Gate valve diameter 65 mm 10 K (termasuk area input rooftank) Kitz bh 2


4.1.2.4.2 Flexible joint diameter 65 mm 10 K Kitz bh 2
4.1.2.4.3 Strainer diameter 65 mm 10 K Kitz bh 2
4.1.2.4.4 Flexible joint 50mm 10 K Tozen bh 2
4.1.2.4.5 Check valve diameter 50 mm 10 K Kitz bh 2
4.1.2.4.6 Gate valve diameter 50 mm 10 K Kitz bh 2
4.1.2.4.7 Water Level Control (WLC) Lengkap dengan pengkabelannya Omron set 5
4.1.2.4.8 Pressure Gauge Winter bh 2
4.1.2.4.9 Fitting dan assesories Ls 1
4.1.2.4.10 Alat bantu dan material batu Ls 1

4.1.2.5 PEMIPAAN POMPA Filter


Area Ruang Pompa
4.1.2.5.1 Gavlvanis Iron Pipe (GIP) medium Class
4.1.2.5.1.1 Header diameter 100 mm Spindo set 4
4.1.2.5.1.2 Pipa diameter 65mm Spindo set 1
4.1.2.5.1.3 Pipa diameter 50mm Spindo set 1
4.1.2.5.1.4 Fitting dan assesories Galunggung Ls 1
4.1.2.5.1.5 Alat bantu dan material batu Ls 1

4.1.2.6 KATUP-KATUP POMPA Filter

4.1.2.6.1 Gate valve diameter 65 mm 10 K (termasuk area input rooftank) Kitz bh 2


4.1.2.6.2 Flexible joint diameter 65 mm 10 K Tozen bh 2
4.1.2.6.3 Strainer diameter 65 mm 10 K Kitz bh 2
4.1.2.6.4 Flexible joint 50mm 10 K Kitz bh 2
4.1.2.6.5 Check valve diameter 50 mm 10 K Kitz bh 2
4.1.2.6.6 Gate valve diameter 50 mm 10 K Kitz bh 13
4.1.2.6.7 Water Level Control (WLC) Lengkap dengan pengkabelannya Omron set 5
4.1.2.6.8 Pressure Gauge Winter bh 2
4.1.2.6.9 Fitting dan assesories Ls 1
4.1.2.6.10 Alat bantu dan material batu Ls 1

4.1.2.7 PEMIPAAN PENGHUBUNG GWT (termasuk valvenya)


4.1.2.7.1 Gavlvanis Iron Pipe (GIP) medium Class
4.1.2.7.1.1 Pipa diameter 200 mm Spindo M 8
4.1.2.7.1.2 Butterfly valve diameter 200 mm 10 K (provisional) Kitz bh 4
4.1.2.7.1.3 Fitting dan assesories Galunggung Ls 1
4.1.2.7.1.4 Alat bantu dan material batu Ls 1

4.1.2.8 PEMIPAAN OVER FLOW GROUND TANK


4.1.2.8.1 PVC Klas D 5 Kg/cm2

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 48
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.2.8.1.1 Pipa diameter 150 mm Intilon M 11


4.1.2.8.1.2 Fitting dan assesories Rucika Ls 1
4.1.2.8.1.3 Alat bantu dan material batu Ls 1

4.1.2.9 PEMIPAAN VENT GROUND TANK


4.1.2.9.1 PVC Klas D 5 Kg/cm2
4.1.2.9.1.1 Pipa diameter 150 mm Intilon M 2
4.1.2.9.1.2 Fitting diameter 150 mm Rucika Ls 1
4.1.2.9.1.3 Alat bantu dan material batu Ls 1

4.1.2.10 PEMIPAAN Seewage Pit


4.1.2.10.1 PVC Klas AW 10K
4.1.2.10.1.1 Pipa diameter 50 mm Intilon M 9
4.1.2.10.1.2 Pipa diameter 65 mm Intilon M 7
4.1.2.10.1.3 Pipa diameter 100 mm Intilon M 12
4.1.2.10.1.4 Check Valve 50mm Kitz bh 8
4.1.2.10.1.5 Check Valve 80mm Kitz bh 2
4.1.2.10.1.6 Fitting diameter 150 mm Rucika Ls 0
4.1.2.10.1.7 Alat bantu dan material batu Ls 0

4.1.2.11 PEMIPAAN Sumppit


4.1.2.11.1 PVC Klas AW 10K
4.1.2.11.1.1 Pipa diameter 80 mm Intilon M 3
4.1.2.11.1.2 Pipa diameter 50 mm Intilon M 18
4.1.2.11.1.3 Check Valve 50mm Kitz bh 8
4.1.2.11.1.4 Fitting & acessories Rucika lot 0
4.1.2.11.1.5 Alat bantu dan material batu Ls 0

4.1.2.12 PEMIPAAN POMPA FLUSHING


Area Ruang Pompa
4.1.2.12.1 Gavlvanis Iron Pipe (GIP) medium Class
4.1.2.12.1.1 Header diameter 100 mm Spindo set 4
4.1.2.12.1.2 Pipa diameter 65mm Spindo set 1
4.1.2.12.1.3 Pipa diameter 50mm Spindo set 1
4.1.2.12.1.4 Fitting dan assesories Galunggung Ls 1
4.1.2.12.1.5 Alat bantu dan material batu Ls 1

4.1.2.13 KATUP-KATUP POMPA FLUSHING

4.1.2.13.1 Gate valve diameter 65 mm 10 K (termasuk area input rooftank) Kitz bh 2


4.1.2.13.2 Flexible joint diameter 65 mm 10 K Kitz bh 2
4.1.2.13.3 Strainer diameter 65 mm 10 K Kitz bh 2
4.1.2.13.4 Flexible joint 50mm 10 K Tozen bh 2
4.1.2.13.5 Check valve diameter 50 mm 10 K Kitz bh 2
4.1.2.13.6 Gate valve diameter 50 mm 10 K Kitz bh 2
4.1.2.13.7 Water Level Control (WLC) Lengkap dengan pengkabelannya Omron set 5
4.1.2.13.8 Pressure Gauge Winter bh 2
4.1.2.13.9 Fitting dan assesories Galunggung Ls 1
4.1.2.13.10 Alat bantu dan material batu Ls 1

4.1.3 PEMIPAAN AIR BERSIH

4.1.3.1 LANTAI BASEMENT


4.1.3.1.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.3.1.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 5
4.1.3.1.1.2 Pipa diameter 50 Westpex M 7
4.1.3.1.1.3 Pipa diameter 40 mm Westpex M 7
4.1.3.1.1.4 Pipa diameter 32 mm Westpex M 5
4.1.3.1.1.5 Pipa diameter 25 mm Westpex M 4
4.1.3.1.1.6 Pipa diameter 15 mm Westpex M 94
4.1.3.1.1.7 Gate valve diameter 50 mm 10 K Kitz bh 1
4.1.3.1.1.8 Fitting dan assesories Westpex Ls 0
4.1.3.1.1.9 Alat bantu dan material batu Ls 0

4.1.3.2 LANTAI 1
4.1.3.2.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.3.2.1.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 1
4.1.3.2.1.2 Pipa diameter 65 mm(Riser) Westpex M 1
4.1.3.2.1.3 Pipa diameter 50 mm Westpex M 9
4.1.3.2.1.4 Pipa diameter 32 mm Westpex M 6
4.1.3.2.1.5 Pipa diameter 25 mm Westpex M 8
4.1.3.2.1.6 Pipa diameter 15 mm Westpex M 78

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 49
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.3.2.1.7 Gate valve diameter 32 mm 10 K Kitz bh 1


4.1.3.2.1.8 Fitting dan assesories Westpex Ls 0
4.1.3.2.1.9 Alat bantu dan material batu Ls 0

4.1.3.3 LANTAI 2
4.1.3.3.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.3.3.1.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 2
4.1.3.3.1.2 Pipa diameter 65 mm(Riser) Westpex M 2
4.1.3.3.1.3 Pipa diameter 32 mm Westpex M 29
4.1.3.3.1.4 Pipa diameter 25 mm Westpex M 6
4.1.3.3.1.5 Pipa diameter 15 mm Westpex M 20
4.1.3.3.1.6 Gate valve diameter 32 mm 10 K Kitz bh 2
4.1.3.3.1.7 Fitting dan assesories Westpex Ls 0
4.1.3.3.1.8 Alat bantu dan material batu Ls 0

4.1.3.4 LANTAI 3
4.1.3.4.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.3.4.1.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 2
4.1.3.4.1.2 Pipa diameter 65 mm Westpex M 2
4.1.3.4.1.3 Pipa diameter 32 mm Westpex M 6
4.1.3.4.1.4 Pipa diameter 25 mm Westpex M 10
4.1.3.4.1.5 Pipa diameter 15 mm Westpex M 26
4.1.3.4.1.6 Gate valve diameter 32 mm 10 K Kitz bh 1
4.1.3.4.1.7 Fitting dan assesories Westpex Ls 0
4.1.3.4.1.8 Alat bantu dan material batu Ls 0

4.1.3.5 LANTAI 4
4.1.3.5.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.3.5.1.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 2
4.1.3.5.1.2 Pipa diameter 65 mm ( pipa Riser ) Westpex M 2
4.1.3.5.1.3 Pipa diameter 32 mm ( pipa Riser ) Westpex M 5
4.1.3.5.1.4 Pipa diameter 25 mm Westpex M 104
4.1.3.5.1.5 Pipa diameter 15 mm Westpex M 260
4.1.3.5.1.6 Gate valve diameter 25 mm 10 K Kitz bh 16
4.1.3.5.1.7 Fitting dan assesories Westpex Ls 1
4.1.3.5.1.8 Alat bantu dan material batu Ls 1

4.1.3.6 LANTAI 5
4.1.3.6.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.3.6.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 2
4.1.3.6.2 Pipa diameter 65 mm ( pipa Riser ) Westpex M 2
4.1.3.6.3 Pipa diameter 32 mm ( pipa Riser ) Westpex M 5
4.1.3.6.4 Pipa diameter 25 mm Westpex M 84
4.1.3.6.5 Pipa diameter 15 mm Westpex M 260
4.1.3.6.6 Gate valve diameter 25 mm 10 K Kitz bh 16
4.1.3.6.7 Fitting dan assesories Westpex Ls 1
4.1.3.6.8 Alat bantu dan material batu Ls 1

4.1.3.7 LANTAI 6
4.1.3.7.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.3.7.1.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 2
4.1.3.7.1.2 Pipa diameter 65 mm ( pipa Riser ) Westpex M 2
4.1.3.7.1.3 Pipa diameter 40 mm ( pipa Riser ) Westpex M 4
4.1.3.7.1.4 Pipa diameter 32 mm ( pipa Riser ) Westpex M 6
4.1.3.7.1.5 Pipa diameter 25 mm Westpex M 84
4.1.3.7.1.6 Pipa diameter 15 mm Westpex M 260
4.1.3.7.1.7 Gate valve diameter 25 mm 10 K Kitz bh 16
4.1.3.7.1.8 Fitting dan assesories Westpex Ls 1
4.1.3.7.1.9 Alat bantu dan material batu Ls 1

4.1.3.8 LANTAI 10 s/d 7


4.1.3.8.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.3.8.1.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 11
4.1.3.8.1.2 Pipa diameter 100 mm ( pipa Riser ) Westpex M 13
4.1.3.8.1.3 Pipa diameter 80 mm ( pipa Riser ) Westpex M 23
4.1.3.8.1.4 Pipa diameter 65 mm ( pipa Riser ) Westpex M 11
4.1.3.8.1.5 Pipa diameter 50 mm ( pipa Riser ) Westpex M 65
4.1.3.8.1.6 Pipa diameter 40 mm ( pipa Riser ) Westpex M 21
4.1.3.8.1.7 Pipa diameter 32 mm ( pipa Riser ) Westpex M 11
4.1.3.8.1.8 Pipa diameter 25 mm Westpex M 666
4.1.3.8.1.9 Pipa diameter 15 mm Westpex M 1.170
4.1.3.8.1.10 Gate valve diameter 25 mm 10 K Kitz bh 64
4.1.3.8.1.11 PRV dia 100 mm Klasse unit 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 50
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.3.8.1.12 Fitting dan assesories Westpex Ls 1


4.1.3.8.1.13 Alat bantu dan material batu Ls 1

4.1.3.9 LANTAI 11
4.1.3.9.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.13.9.1.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 6
4.13.9.1.2 Pipa diameter 100mm ( pipa Riser ) Westpex M 6
4.13.9.1.3 Pipa diameter 65 mm ( pipa Riser ) Westpex M 6
4.13.9.1.4 Pipa diameter 25 mm ( pipa Riser ) Westpex M 42
4.13.9.1.5 Pipa diameter 25 mm Westpex M 84
4.13.9.1.6 Pipa diameter 15 mm Westpex M 260
4.13.9.1.7 Gate valve diameter 25 mm 10 K Kitz bh 16
4.13.9.1.8 Fitting dan assesories Westpex Ls 1
4.13.9.1.9 Alat bantu dan material batu Ls 1

4.1.3.10 LANTAI 12
4.1.3.10.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.3.10.1.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 6
4.1.3.10.1.2 Pipa diameter 100mm ( pipa Riser ) Westpex M 6
4.1.3.10.1.3 Pipa diameter 65 mm ( pipa Riser ) Westpex M 6
4.1.3.10.1.4 Pipa diameter 32 mm ( pipa Riser ) Westpex M 47
4.1.3.10.1.5 Pipa diameter 25mm Westpex M 55
4.1.3.10.1.6 Pipa diameter 15 mm Westpex M 182
4.1.3.10.1.7 Gate valve diameter 25 mm 10 K Kitz bh 16
4.1.3.10.1.8 Fitting dan assesories Westpex Ls 1
4.1.3.10.1.9 Alat bantu dan material batu Ls 1

4.1.3.11 LANTAI 13
4.1.3.11.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 6
4.1.3.11.2 Pipa diameter 100mm ( pipa Riser ) Westpex M 6
4.1.3.11.3 Pipa diameter 65 mm ( pipa Riser ) Westpex M 6
4.1.3.11.4 Pipa diameter 50 mm ( pipa Riser ) Westpex M 26
4.1.3.11.5 Pipa diameter 25 mm Westpex M 55
4.1.3.11.6 Pipa diameter 15 mm Westpex M 182
4.1.3.11.7 Gate valve diameter 40 mm 10 K Kitz bh 2
4.1.3.11.8 Gate valve diameter 25 mm 10 K Kitz bh 13
4.1.3.11.9 Fitting dan assesories Westpex Ls 1
4.1.3.11.10 Alat bantu dan material batu Ls 1

4.1.3.12 LANTAI 14
4.1.3.12.1 Pipa diameter 50 mm(Transfer Rooftank) Galvanis Spindo M 6
4.1.3.12.2 Pipa diameter 40 mm(Pipa riser) Westpex M 42
4.1.3.12.3 Pipa diameter 25 mm Westpex M 59
4.1.3.12.4 Pipa diameter 15 mm Westpex M 111
4.1.3.12.5 Gate valve diameter 25 mm 10 K Kitz bh 5
4.1.3.12.6 Fitting dan assesories Westpex Ls 1
4.1.3.12.7 Alat bantu dan material batu Ls 1

4.1.3.13 LANTAI ATAP


4.1.3.13.1 Pipa Header 150mm(galvanis) Spindo M 6
4.1.3.13.2 Pipa supply untuk Roof tank 50 mm(galvanis) Spindo M 39
4.1.3.13.3 Pipa supply untuk Lt 1,2 dan 3 65 mm Westpex M 52
4.1.3.13.4 Pipa supply untuk Lt 4 s/d 10 diamrter 100 mm Westpex M 46
4.1.3.13.5 Pipa supply untuk Lt 11 s/d 14 Westpex
4.1.3.13.5.1 Pipa diameter 80 mm Westpex M 7
4.1.3.13.5.2 Pipa diameter 65 mm Westpex M 13
4.1.3.13.5.3 Pipa diameter 50 mm Westpex M 52
4.1.3.13.5.4 Pipa diameter 40 mm Westpex M 8
4.1.3.13.6 Butter Fly diameter 100 mm 10 K Kitz bh 5
4.1.3.13.7 Butter Fly diameter 65 mm 10 K Kitz bh 3
4.1.3.13.8 Butter Fly iameter 80 mm 10 K Kitz bh 1
4.1.3.13.9 Gate valve diameter 40 mm 10 K Kitz bh 6
4.1.3.13.10 Fitting dan assesories Westpex Ls 1
4.1.3.13.11 Alat bantu dan material batu Ls 1

4.1.4 PEMIPAAN AIR BERSIH FLUSHING

4.1.4.1 LANTAI BASEMENT


4.1.4.1.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.1.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 10
4.1.4.1.1.2 Pipa diameter 40 mm Westpex M 10
4.1.4.1.1.3 Pipa diameter 32 mm Westpex M 5
4.1.4.1.1.4 Pipa diameter 25 mm Westpex M 7

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 51
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.4.1.1.5 Pipa diameter 15 mm Westpex M 13


4.1.4.1.1.6 Gate valve diameter 40 mm 10 K Kitz bh 1
4.1.4.1.1.7 Fitting dan assesories Westpex Ls 0
4.1.4.1.1.8 Alat bantu dan material batu Ls 0

4.1.4.2 LANTAI 1
4.1.4.2.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.2.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 2
4.1.4.2.1.2 Pipa diameter 50 mm ( pipa riser) Westpex M 2
4.1.4.2.1.3 Pipa diameter 32 mm Westpex M 6
4.1.4.2.1.4 Pipa diameter 25 mm Westpex M 20
4.1.4.2.1.5 Pipa diameter 15 mm Westpex M 46
4.1.4.2.1.6 Gate valve diameter 32 mm 10 K Kitz bh 1
4.1.4.2.1.7 Fitting dan assesories Westpex Ls 0
4.1.4.2.1.8 Alat bantu dan material batu Ls 0

4.1.4.3 LANTAI 2
4.1.4.3.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.3.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 2
4.1.4.3.1.2 Pipa diameter 50 mm ( pipa riser) Westpex M 2
4.1.4.3.1.3 Pipa diameter 32 mm Westpex M 8
4.1.4.3.1.4 Pipa diameter 25 mm Westpex M 26
4.1.4.3.1.5 Pipa diameter 15 mm Westpex M 52
4.1.4.3.1.6 Gate valve diameter 32 mm 10 K Kitz bh 1
4.1.4.3.1.7 Fitting dan assesories Westpex Ls 0
4.1.4.3.1.8 Alat bantu dan material batu Ls 0

4.1.4.4 LANTAI 3
4.1.4.4.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.4.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 1
4.1.4.4.1.2 Pipa diameter 50 mm ( pipa riser) Westpex M 1
4.1.4.4.1.3 Pipa diameter 32 mm Westpex M 9
4.1.4.4.1.4 Pipa diameter 25 mm Westpex M 20
4.1.4.4.1.5 Pipa diameter 15 mm Westpex M 39
4.1.4.4.1.6 Gate valve diameter 32 mm 10 K Kitz bh 1
4.1.4.4.1.7 Fitting dan assesories Westpex Ls 0
4.1.4.4.1.8 Alat bantu dan material batu Ls 0

4.1.4.5 LANTAI 4
4.1.4.5.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.5.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 0
4.1.4.5.1.2 Pipa diameter 50 mm ( pipa riser) Westpex 0
4.1.4.5.1.3 Pipa diameter 25 mm Westpex M 42
4.1.4.5.1.4 Pipa diameter 15 mm Westpex M 125
4.1.4.5.1.5 Gate valve diameter 15 mm 10 K Kitz bh 16
4.1.4.5.1.6 Fitting dan assesories Westpex Ls 1
4.1.4.5.1.7 Alat bantu dan material batu Ls 1

4.1.4.6 LANTAI 5
4.1.4.6.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.6.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 0
4.1.4.6.1.2 Pipa diameter 50 mm ( pipa riser) Westpex M 0
4.1.4.6.1.3 Pipa diameter 32 mm ( pipa riser ) Westpex M 42
4.1.4.6.1.4 Pipa diameter 15 mm Westpex M 45
4.1.4.6.1.5 Gate valve diameter 15 mm 10 K Kitz bh 16
4.1.4.6.1.6 Fitting dan assesories Westpex Ls 1
4.1.4.6.1.7 Alat bantu dan material batu Ls 1

4.1.4.7 LANTAI 6
4.1.4.7.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.7.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 0
4.1.4.7.1.2 Pipa diameter 50 mm ( pipa riser) Westpex M 0
4.1.4.7.1.3 Pipa diameter 40 mm ( pipa riser ) Westpex M 2
4.1.4.7.1.4 Pipa diameter 15 mm Westpex M 125
4.1.4.7.1.5 Gate valve diameter 15 mm 10 K Kitz bh 16
4.1.4.7.1.6 Fitting dan assesories Westpex Ls 1
4.1.4.7.1.7 Alat bantu dan material batu Ls 1

4.1.4.8 LANTAI 10 s/d 7


4.1.4.8.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.8.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 11
4.1.4.8.1.2 Pipa diameter 50 mm ( pipa riser) Westpex M 11

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 52
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.4.8.1.3 Pipa diameter 50 mm ( pipa riser ) Westpex M 84


4.1.4.8.1.4 Pipa diameter 15 mm Westpex M 666
4.1.4.8.1.5 Gate valve diameter 15 mm 10 K Kitz bh 64
4.1.4.8.1.6 PRV dia 100 mm Klasse unit 1
4.1.4.8.1.7 Fitting dan assesories Westpex Ls 1
4.1.4.8.1.8 Alat bantu dan material batu Ls 1

4.1.4.9 LANTAI 11
4.1.4.9.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.9.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 6
4.1.4.9.1.2 Pipa diameter 50 mm ( pipa riser) Westpex M 6
4.1.4.9.1.3 Pipa diameter 50 mm ( pipa riser ) Westpex M 6
4.1.4.9.1.4 Pipa diameter 20 mm ( pipa riser ) Westpex M 42
4.1.4.9.1.5 Pipa diameter 15 mm Westpex M 167
4.1.4.9.1.6 Gate valve diameter 15 mm 10 K Kitz bh 16
4.1.4.9.1.7 Fitting dan assesories Westpex Ls 1
4.1.4.9.1.8 Alat bantu dan material batu Ls 1

4.1.4.10 LANTAI 12
4.1.4.10.1 Polypropylene Random (PPR) PN - 10
Pemipaan lantai
4.1.4.10.1.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 6
4.1.4.10.1.2 Pipa diameter 50 mm ( pipa riser) Westpex M 6
4.1.4.10.1.3 Pipa diameter 50 mm ( pipa riser ) Westpex M 6
4.1.4.10.1.4 Pipa diameter 25 mm ( pipa riser ) Westpex M 42
4.1.4.10.1.5 Pipa diameter 15 mm Westpex M 125
4.1.4.10.1.6 Gate valve diameter 15 mm 10 K Kitz bh 12
4.1.4.10.1.7 Fitting dan assesories Westpex Ls 1
4.1.4.10.1.8 Alat bantu dan material batu Ls 1

4.1.4.11 LANTAI 13
4.1.4.11.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 6
4.1.4.11.2 Pipa diameter 50 mm ( pipa riser) Westpex M 6
4.1.4.11.3 Pipa diameter 50 mm ( pipa riser ) Westpex M 6
4.1.4.11.4 Pipa diameter 40 mm ( pipa riser ) Westpex M 13
4.1.4.11.5 Pipa diameter 32 mm ( pipa riser ) Westpex M 13
4.1.4.11.6 Pipa diameter 25 mm ( pipa riser ) Westpex M 42
4.1.4.11.7 Pipa diameter 15 mm Westpex M 125
4.1.4.11.8 Gate valve diameter 15 mm 10 K Kitz bh 12
4.1.4.11.9 Fitting dan assesories Westpex Ls 1
4.1.4.11.10 Alat bantu dan material batu Ls 1

4.1.4.12 LANTAI 14
4.1.4.12.1 Pipa diameter 50 mm ( pipa riser) Galvaniz Spindo M 6
4.1.4.12.2 Pipa diameter 50 mm ( pipa riser) Westpex M 6
4.1.4.12.3 Pipa diameter 40 mm ( pipa riser ) Westpex M 26
4.1.4.12.4 Pipa diameter 15 mm Westpex M 69
4.1.4.12.5 Gate valve diameter 15 mm 10 K Kitz bh 5
4.1.4.12.6 Fitting dan assesories Westpex Ls 1
4.1.4.12.7 Alat bantu dan material batu Ls 1

4.1.4.13 LANTAI ATAP


4.1.4.13.1 Pipa Header 150mm(galvanis) Spindo M 6
4.1.4.13.2 Pipa supply untuk Roof tank 50 mm(galvanis) Spindo M 52
4.1.4.13.3 Pipa supply untuk Lt 1,2 dan 3 65 mm Westpex M 52
4.1.4.13.4 Pipa supply untuk Lt 4 s/d 10 diamrter 100 mm Westpex M 52
4.1.4.13.5 Pipa supply untuk Lt 11 s/d 14
4.1.4.13.5.1 Pipa diameter 40 mm Westpex M 52
4.1.4.13.5.2 Pipa diameter 32m Westpex M 13
4.1.4.13.6 Butter Fly valve diameter 100mm 10 K Kitz bh 3
4.1.4.13.7 Butter Fly valve diameter 80 mm 10 K Kitz bh 1
4.1.4.13.8 Gatevalve diameter 65 mm 10 K Kitz bh 4
4.1.4.13.9 Gatevalve diameter 50 mm 10 K Kitz bh 3
4.1.4.13.10 Gate valve diameter 40 mm 10 K Kitz bh 6
4.1.4.13.11 Fitting dan assesories Spindo Ls 1
4.1.4.13.12 Alat bantu dan material batu Ls 1

4.1.5 PEMIPAAN AIR KOTOR

4.1.5.1 LANTAI Basement


4.1.5.1.1 PVC Klas AW 10 Kg/cm2
4.1.5.1.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 1
4.1.5.1.1.2 Pipa diameter 100 mm Intilon M 4
4.1.5.1.1.3 Pipa diameter 50 mm Intilon M 0

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 53
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.5.1.1.4 Pipa diameter 40 mm Intilon M 1


4.1.5.1.1.5 FCO (Floor clean out) diameter 100 mm Kharisma bh 3
4.1.5.1.1.6 Fitting dan assesories Rucika Ls 0
4.1.5.1.1.7 Alat bantu dan material batu Ls 0

4.1.5.2 LANTAI 1
4.1.5.2.1 PVC Klas AW 10 Kg/cm2
4.1.5.2.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 2
4.1.5.2.1.2 Pipa diameter 100 mm Intilon M 3
4.1.5.2.1.3 Pipa diameter 50 mm Intilon M 1
4.1.5.2.1.4 Pipa diameter 40 mm Intilon M 3
4.1.5.2.1.5 FCO (Floor clean out) diameter 100 mm Kharisma bh 1
4.1.5.2.1.6 Corrring + Grouttting lantai Ttk 6
4.1.5.2.1.7 Fitting dan assesories Rucika Ls 0
4.1.5.2.1.8 Alat bantu dan material batu Ls 0

4.1.5.3 LANTAI 2
4.1.5.3.1 PVC Klas AW 10 Kg/cm2
4.1.5.3.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 1
4.1.5.3.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 1
4.1.5.3.1.3 Pipa diameter 100 mm Intilon M 13
4.1.5.3.1.4 Pipa diameter 50 mm Intilon M 2
4.1.5.3.1.5 Pipa diameter 40 mm Intilon M 13
4.1.5.3.1.6 FCO (Floor clean out) diameter 100 mm Kharisma bh 2
4.1.5.3.1.7 Corrring + Grouttting lantai Ttk 7
4.1.5.3.1.8 Fitting dan assesories Rucika Ls 0
4.1.5.3.1.9 Alat bantu dan material bantu Ls 0

4.1.5.4 LANTAI 3
4.1.5.4.1 PVC Klas AW 10 Kg/cm2
4.1.5.4.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 1
4.1.5.4.1.2 Pipa diameter 100 mm Intilon M 2
4.1.5.4.1.3 Pipa diameter 50 mm Intilon M 1
4.1.5.4.1.4 Pipa diameter 40 mm Intilon M 3
4.1.5.4.1.5 FCO (Floor clean out) diameter 100 mm Kharisma bh 2
4.1.5.4.1.6 Corrring + Grouttting lantai Ttk 7
4.1.5.4.1.7 Fitting dan assesories Rucika Ls 0
4.1.5.4.1.8 Alat bantu dan material batu Ls 0

4.1.5.5 LANTAI 11 s/d 4


4.1.5.5.1 PVC Klas AW 10 Kg/cm2
4.1.5.5.1.1 Pipa diameter 100 mm ( pipa riser ) Intilon M 167
4.1.5.5.1.2 Pipa diameter 150 mm Intilon M 21
4.1.5.5.1.3 Pipa diameter 100 mm Intilon M 359
4.1.5.5.1.4 FCO (Floor clean out) diameter 100 mm Kharisma bh 60
4.1.5.5.1.5 Corrring + Grouttting lantai Ttk 188
4.1.5.5.1.6 Fitting dan assesories Rucika Ls 1
4.1.5.5.1.7 Alat bantu dan material batu Ls 1

4.1.5.6 LANTAI 12
4.1.5.6.1 PVC Klas AW 10 Kg/cm2
4.1.5.6.1.1 Pipa diameter 100 mm ( pipa riser ) Intilon M 42
4.1.5.6.1.2 Pipa diameter 100 mm Intilon M 65
4.1.5.6.1.3 FCO (Floor clean out) diameter 100 mm Kharisma bh 5
4.1.5.6.1.4 Corrring + Grouttting lantai Ttk 17
4.1.5.6.1.5 Fitting dan assesories Rucika Ls 1
4.1.5.6.1.6 Alat bantu dan material batu Ls 1

4.1.5.7 LANTAI 13
4.1.5.7.1 PVC Klas AW 10 Kg/cm2
4.1.5.7.1.1 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.5.7.1.2 Pipa diameter 100 mm Intilon M 65
4.1.5.7.1.3 FCO (Floor clean out) diameter 100 mm Kharisma bh 5
4.1.5.7.1.4 Corrring + Grouttting lantai Ttk 17
4.1.5.7.1.5 Fitting dan assesories Rucika Ls 1
4.1.5.7.1.6 Alat bantu dan material batu Ls 1

4.1.5.8 LANTAI 14
4.1.5.8.1 PVC Klas AW 10 Kg/cm2
4.1.5.8.1.1 Pipa diameter 100 mm ( pipa riser ) Intilon M 26
4.1.5.8.1.2 Pipa diameter 100 mm Intilon M 52
4.1.5.8.1.3 Corrring + Grouttting lantai Ttk 5
4.1.5.8.1.4 Fitting dan assesories Rucika Ls 1
4.1.5.8.1.5 Alat bantu dan material batu Ls 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 54
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.6 PEMIPAAN AIR DRAIN

4.1.6.1 LANTAI BASEMENT


4.1.6.1.1 PVC Klas AW 10 Kg/cm2
4.1.6.1.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 8
4.1.6.1.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 9
4.1.6.1.1.3 Pipa diameter 80 mm Intilon M 1
4.1.6.1.1.4 Pipa diameter 65 mm Intilon M 2
4.1.6.1.1.5 Pipa diameter 50 mm Intilon M 3
4.1.6.1.1.6 Pipa diameter 32 mm Intilon M 20
4.1.6.1.1.7 FCO (Floor clean out) diameter 50 mm Kharisma bh 2
4.1.6.1.1.8 Fitting dan assesories Rucika Ls 0
4.1.6.1.1.9 Alat bantu dan material batu Ls 0

4.1.6.2 LANTAI 1
4.1.6.2.1 PVC Klas AW 10 Kg/cm2
4.1.6.2.1.1 Pipa diameter 100 mm ( pipa riser ) Intilon M 1
4.1.6.2.1.2 Pipa diameter 80 mm Intilon M 3
4.1.6.2.1.3 Pipa diameter 65 mm Intilon M 2
4.1.6.2.1.4 Pipa diameter 50 mm Intilon M 4
4.1.6.2.1.5 Pipa diameter 32 mm Intilon M 68
4.1.6.2.1.6 FCO (Floor clean out) diameter 50 mm Kharisma bh 11
4.1.6.2.1.7 Corrring + Grouttting lantai Ttk 24
4.1.6.2.1.8 Fitting dan assesories Rucika Ls 0
4.1.6.2.1.9 Alat bantu dan material batu Ls 0

4.1.6.3 LANTAI 2
4.1.6.3.1 PVC Klas AW 10 Kg/cm2
4.1.6.3.1.1 Pipa diameter 100 mm ( pipa riser ) Intilon M 1
4.1.6.3.1.2 Pipa diameter 65 mm Intilon M 2
4.1.6.3.1.3 Pipa diameter 50 mm Intilon M 1
4.1.6.3.1.4 Pipa diameter 32 mm Intilon M 13
4.1.6.3.1.5 FCO (Floor clean out) diameter50 mm Kharisma bh 2
4.1.6.3.1.6 Corrring + Grouttting lantai Ttk 24
4.1.6.3.1.7 Fitting dan assesories Rucika Ls 0
4.1.6.3.1.8 Alat bantu dan material batu Ls 0

4.1.6.4 LANTAI 3
4.1.6.4.1 PVC Klas AW 10 Kg/cm2
4.1.6.4.1.1 Pipa diameter 65 mm Intilon M 1
4.1.6.4.1.2 Pipa diameter 50 mm Intilon M 2
4.1.6.4.1.3 Pipa diameter 32 mm Intilon M 33
4.1.6.4.1.4 FCO (Floor clean out) diameter 50 mm Kharisma bh 2
4.1.6.4.1.5 Corrring + Grouttting lantai Ttk 24
4.1.6.4.1.6 Fitting dan assesories Rucika Ls 0
4.1.6.4.1.7 Alat bantu dan material batu Ls 0

4.1.6.5 LANTAI 11 s/d 4


4.1.6.5.1 PVC Klas AW 10 Kg/cm2
4.1.6.5.1.1 Pipa diameter 100 mm ( pipa riser ) Intilon M 26
4.1.6.5.1.2 Pipa diameter 80 mm ( pipa riser ) Intilon M 167
4.1.6.5.1.3 Pipa diameter 65 mm Intilon M 78
4.1.6.5.1.4 Pipa diameter 50 mm Intilon M 267
4.1.6.5.1.5 Pipa diameter 32 mm Intilon M 715
4.1.6.5.1.6 FCO (Floor clean out) diameter 50 mm Kharisma bh 67
4.1.6.5.1.7 Corrring + Grouttting lantai Ttk 451
4.1.6.5.1.8 Fitting dan assesories Rucika Ls 1
4.1.6.5.1.9 Alat bantu dan material batu Ls 1

4.1.6.6 LANTAI 12
4.1.6.6.1 PVC Klas AW 10 Kg/cm2
4.1.6.6.1.1 Pipa diameter 80 mm ( pipa riser ) Intilon M 42
4.1.6.6.1.2 Pipa diameter 65 mm Intilon M 16
4.1.6.6.1.3 Pipa diameter 50 mm Intilon M 78
4.1.6.6.1.4 Pipa diameter 32 mm Intilon M 94
4.1.6.6.1.5 FCO (Floor clean out) diameter 50 mm Kharisma bh 16
4.1.6.6.1.6 Corrring + Grouttting lantai Ttk 48
4.1.6.6.1.7 Fitting dan assesories Rucika Ls 1
4.1.6.6.1.8 Alat bantu dan material batu Ls 1

4.1.6.7 LANTAI 13
4.1.6.7.1 PVC Klas AW 10 Kg/cm2
4.1.6.7.1.1 Pipa diameter 80 mm ( pipa riser ) Intilon M 32
4.1.6.7.1.2 Pipa diameter 65 mm Intilon M 16
4.1.6.7.1.3 Pipa diameter 50 mm Intilon M 78
4.1.6.7.1.4 Pipa diameter 32 mm Intilon M 94
4.1.6.7.1.5 FCO (Floor clean out) diameter 50 mm Kharisma bh 16
4.1.6.7.1.6 Corrring + Grouttting lantai Ttk 48
4.1.6.7.1.7 Fitting dan assesories Rucika Ls 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 55
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.6.7.1.8 Alat bantu dan material batu Ls 1

4.1.6.8 LANTAI 14
4.1.6.8.1 PVC Klas AW 10 Kg/cm2
4.1.6.8.1.1 Pipa diameter 65 mm Intilon M 13
4.1.6.8.1.2 Pipa diameter 50 mm Intilon M 39
4.1.6.8.1.3 Pipa diameter 32 mm Intilon M 20
4.1.6.8.1.4 FCO (Floor clean out) diameter 50 mm Kharisma bh 4
4.1.6.8.1.5 Corrring + Grouttting lantai Ttk 13
4.1.6.8.1.6 Fitting dan assesories Rucika Ls 1
4.1.6.8.1.7 Alat bantu dan material batu Ls 1

4.1.7 PEMIPAAN AIR HUJAN

4.1.7.1 LANTAI 1
4.1.7.1.1 PVC Klas AW 10 Kg/cm2
4.1.7.1.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 0
4.1.7.1.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 1
4.1.7.1.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 1
4.1.7.1.1.4 Pipa diameter 100 mm Intilon M 3
4.1.7.1.1.5 Pipa diameter 80 mm Intilon M 1
4.1.7.1.1.6 RD (Roof Drain) diameter 100 mm Kharisma bh 5
4.1.7.1.1.7 Fitting dan assesories Rucika Ls 0
4.1.7.1.1.8 Alat bantu dan material batu Ls 0

4.1.7.2 LANTAI 2
4.1.7.2.1 PVC Klas AW 10 Kg/cm2
4.1.7.2.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 1
4.1.7.2.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 16
4.1.7.2.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 6
4.1.7.2.1.4 Pipa diameter 100 mm Intilon M 12
4.1.7.2.1.5 Pipa diameter 80 mm Intilon M 11
4.1.7.2.1.6 RD (Roof Drain) diameter 100 mm Kharisma bh 5
4.1.7.2.1.7 Corrring + Grouttting lantai Ttk 5
4.1.7.2.1.8 Fitting dan assesories Rucika Ls 1
4.1.7.2.1.9 Alat bantu dan material batu Ls 1

4.1.7.3 LANTAI 3
4.1.7.3.1 PVC Klas AW 10 Kg/cm2
4.1.7.3.1.1 Pipa diameter 100 mm ( pipa riser ) Intilon M 21
4.1.7.3.1.2 Pipa diameter 150 mm Intilon M 20
4.1.7.3.1.3 Pipa diameter 100 mm Intilon M 20
4.1.7.3.1.4 Pipa diameter 80 mm Intilon M 6
4.1.7.3.1.5 Fitting dan assesories Rucika Ls 1
4.1.7.3.1.6 Alat bantu dan material batu Ls 1

4.1.7.4 LANTAI 4
4.1.7.4.1 PVC Klas AW 10 Kg/cm2
4.1.7.4.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.4.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.4.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 19
4.1.7.4.1.4 Fitting dan assesories Rucika Ls 1
4.1.7.4.1.5 Alat bantu dan material batu Ls 1

4.1.7.5 LANTAI 5
4.1.7.5.1 PVC Klas AW 10 Kg/cm2
4.1.7.5.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.5.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.5.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.5.1.4 Fitting dan assesories Rucika Ls 1
4.1.7.5.1.5 Alat bantu dan material batu Ls 1

4.1.7.6 LANTAI 6
4.1.7.6.1 PVC Klas AW 10 Kg/cm2
4.1.7.6.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.6.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.6.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.6.1.4 Fitting dan assesories Rucika Ls 1
4.1.7.6.1.5 Alat bantu dan material batu Ls 1

4.1.7.7 LANTAI 7
4.1.7.7.1 PVC Klas AW 10 Kg/cm2
4.1.7.7.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.7.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.7.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.7.1.4 Fitting dan assesories Rucika Ls 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 56
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.7.7.1.5 Alat bantu dan material batu Ls 1

4.1.7.8 LANTAI 8
4.1.7.8.1 PVC Klas AW 10 Kg/cm2
4.1.7.8.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.8.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.8.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.8.1.4 Fitting dan assesories Rucika Ls 1
4.1.7.8.1.5 Alat bantu dan material batu Ls 1

4.1.7.9 LANTAI 9
4.1.7.9.1 PVC Klas AW 10 Kg/cm2
4.1.7.9.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.9.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.9.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.9.1.4 Fitting dan assesories Rucika Ls 1
4.1.7.9.1.5 Alat bantu dan material batu Ls 1

4.1.7.10 LANTAI 10
4.1.7.10.1 PVC Klas AW 10 Kg/cm2
4.1.7.10.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.10.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.10.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.10.1.4 Fitting dan assesories Rucika Ls 1
4.1.7.10.1.5 Alat bantu dan material batu Ls 1

4.1.7.11 LANTAI 11
4.1.7.11.1 PVC Klas AW 10 Kg/cm2
4.1.7.11.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.11.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.11.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.11.1.4 Fitting dan assesories Rucika Ls 1
4.1.7.11.1.5 Alat bantu dan material batu Ls 1

4.1.7.12 LANTAI 12
4.1.7.12.1 PVC Klas AW 10 Kg/cm2
4.1.7.12.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.12.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.12.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.12.1.4 Fitting dan assesories Rucika Ls 1
4.1.7.12.1.5 Alat bantu dan material batu Ls 1

4.1.7.13 LANTAI 13
4.1.7.13.1 PVC Klas AW 10 Kg/cm2
4.1.7.13.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.13.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.13.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.13.1.4 Fitting dan assesories Rucika Ls 1
4.1.7.13.1.5 Alat bantu dan material batu Ls 1

4.1.7.14 LANTAI 14
4.1.7.14.1 PVC Klas AW 10 Kg/cm2
4.1.7.14.1.1 Pipa diameter 150 mm ( pipa riser ) Intilon M 11
4.1.7.14.1.2 Pipa diameter 100 mm ( pipa riser ) Intilon M 32
4.1.7.14.1.3 Pipa diameter 80 mm ( pipa riser ) Intilon M 11
4.1.7.14.1.4 RD (Roof Drain) diameter 100 mm Kharisma bh 6
4.1.7.14.1.5 RD (Roof Drain) diameter 80 mm Kharisma bh 3
4.1.7.14.1.6 Corrring + Grouttting lantai Ttk 9
4.1.7.14.1.7 Fitting dan assesories Rucika Ls 1
4.1.7.14.1.8 Alat bantu dan material batu Ls 1

4.1.7.15 LANTAI ATAP


4.1.7.15.1 PVC Klas AW 10 Kg/cm2
4.1.7.15.1.1 Pipa diameter 100 mm ( pipa riser ) Intilon M 20
4.1.7.15.1.2 Pipa diameter 80 mm ( pipa riser ) Intilon M 20
4.1.7.15.1.3 RD (Roof Drain) diameter 100 mm Kharisma bh 6
4.1.7.15.1.4 RD (Roof Drain) diameter 80 mm Kharisma bh 3
4.1.7.15.1.5 Corrring + Grouttting lantai Ttk 9
4.1.7.15.1.6 Fitting dan assesories Rucika Ls 1
4.1.7.15.1.7 Alat bantu dan material batu Ls 1

4.1.7.16 AREA LANDSCAP LANTAI 1


4.1.7.16.1 Pipa diameter 100 mm Intilon M 28
4.1.7.16.2 Pipa diameter 200 mm Intilon M 27
4.1.7.16.3 Fitting dan assesories Rucika Ls 0
4.1.7.16.4 Alat bantu dan material batu Ls 0

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 57
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.8 PEMIPAAN VENT

4.1.8.1 Lantai Basement


4.1.8.1.1 PVC Klas D 5 Kg/cm2
4.1.8.1.1.1 Pipa diameter 50 mm Intilon M 2
4.1.8.1.1.2 Pipa diameter 32 mm Intilon M 9
4.1.8.1.1.3 Fitting dan assesories Rucika Ls 0
4.1.8.1.1.4 Alat bantu dan material batu Ls 0

4.1.8.2 Lantai 1
4.1.8.2.1 PVC Klas D 5 Kg/cm2
4.1.8.2.1.1 Pipa diameter 50 mm(Riser) Intilon M 1
4.1.8.2.1.2 Pipa diameter 50 mm Intilon M 2
4.1.8.2.1.3 Pipa diameter 32 mm Intilon M 65
4.1.8.2.1.4 Fitting dan assesories Rucika Ls 0
4.1.8.2.1.5 Alat bantu dan material batu Ls 0

4.1.8.3 Lantai 2
4.1.8.3.1 PVC Klas D 5 Kg/cm2
4.1.8.3.1.1 Pipa diameter 50 mm(Riser) Intilon M 1
4.1.8.3.1.2 Pipa diameter 50 mm Intilon M 2
4.1.8.3.1.3 Pipa diameter 32 mm Intilon M 65
4.1.8.3.1.4 Fitting dan assesories Rucika Ls 0
4.1.8.3.1.5 Alat bantu dan material batu Ls 0

4.1.8.4 Lantai 3
4.1.8.4.1 PVC Klas D 5 Kg/cm2
4.1.8.4.1.1 Pipa diameter 50 mm(Riser) Intilon M 1
4.1.8.4.1.2 Pipa diameter 50 mm Intilon M 2
4.1.8.4.1.3 Pipa diameter 32 mm Intilon M 78
4.1.8.4.1.4 Fitting dan assesories Rucika Ls 0
4.1.8.4.1.5 Alat bantu dan material batu Ls 0

4.1.8.5 Lantai 11 s/d 4


4.1.8.5.1 PVC Klas D 5 Kg/cm2
4.1.8.5.1.1 Pipa diameter 50 mm(Riser) Intilon M 167
4.1.8.5.1.2 Pipa diameter 50 mm Intilon M 1.000
4.1.8.5.1.3 Pipa diameter 32 mm Intilon M 1.248
4.1.8.5.1.4 Fitting dan assesories Rucika Ls 1
4.1.8.5.1.5 Alat bantu dan material batu Ls 1

4.1.8.6 Lantai 12
4.1.8.6.1 PVC Klas D 5 Kg/cm2
4.1.8.6.1.1 Pipa diameter 50mm(riser) Intilon M 42
4.1.8.6.1.2 Pipa diameter 50mm Intilon M 39
4.1.8.6.1.3 Pipa diameter 32 mm Intilon M 130
4.1.8.6.1.4 Fitting dan assesories Rucika Ls 1
4.1.8.6.1.5 Alat bantu dan material batu Ls 1

4.1.8.7 Lantai 13
4.1.8.7.1 PVC Klas D 5 Kg/cm2
4.1.8.7.1.1 Pipa diameter 50mm(riser) Intilon M 42
4.1.8.7.1.2 Pipa diameter 50mm Intilon M 39
4.1.8.7.1.3 Pipa diameter 32 mm Intilon M 130
4.1.8.7.1.4 Fitting dan assesories Rucika Ls 1
4.1.8.7.1.5 Alat bantu dan material batu Ls 1

4.1.8.8 Lantai 14
4.1.8.8.1 PVC Klas D 5 Kg/cm2
4.1.8.8.1.1 Pipa diameter 50mm(riser) Intilon M 42
4.1.8.8.1.2 Pipa diameter 50mm Intilon M 39
4.1.8.8.1.3 Pipa diameter 32 mm Intilon M 130
4.1.8.8.1.4 Fitting dan assesories Rucika Ls 1
4.1.8.8.1.5 Alat bantu dan material batu Ls 1

4.1.9 PEMIPAAN AIR PANAS

4.1.9.1 LANTAI BASEMENT


4.1.9.1.1 Polypropylene Random (PPR) PN - 20
Pemipaan lantai
4.1.9.1.1.1 Pipa diameter 25 mm Westpex M 2
4.1.9.1.1.2 Pipa diameter 20 mm Westpex M 2

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 58
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.9.1.1.3 Elektrik Water Heater 30 Liter M 3


4.1.9.1.1.4 Gate valve diameter 3/4" Kitz bh 2
4.1.9.1.1.5 Fitting dan assesories Westpex Ls 0
4.1.9.1.1.6 Alat bantu dan material batu Ls 0

4.1.9.2 LANTAI 1
4.1.9.2.1 Polypropylene Random (PPR) PN - 20
Pemipaan lantai
4.1.9.2.1.1 Pipa diameter 25 mm Westpex M 27
4.1.9.2.1.2 Pipa diameter 20 mm Westpex M 24
4.1.9.2.1.3 Elektrik Water Heater 30 Liter M 2
4.1.9.2.1.4 Gate valve diameter 3/4" Kitz bh 1
4.1.9.2.1.5 Fitting dan assesories Westpex Ls 1
4.1.9.2.1.6 Alat bantu dan material batu Ls 1

4.1.9.3 LANTAI 2
4.1.9.3.1 Polypropylene Random (PPR) PN - 20
4.1.9.3.1.1 Pemipaan lantai
4.1.9.3.1.2 Pipa diameter 25 mm Westpex M 27
4.1.9.3.1.3 Pipa diameter 20 mm Westpex M 24
4.1.9.3.1.4 Elektrik Water Heater 30 Liter M 2
4.1.9.3.1.5 Gate valve diameter 3/4" Kitz bh 1
4.1.9.3.1.6 Fitting dan assesories Westpex Ls 1
4.1.9.3.1.7 Alat bantu dan material batu Ls 1

4.1.9.4 LANTAI 3
4.1.9.4.1 Polypropylene Random (PPR) PN - 20
Pemipaan lantai
4.1.9.4.1.1 Pipa diameter 25 mm Westpex M 22
4.1.9.4.1.2 Pipa diameter 20 mm Westpex M 24
4.1.9.4.1.3 Gate valve diameter 3/4" Kitz bh 1
4.1.9.4.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.4.1.5 Alat bantu dan material batu Ls 1

4.1.9.5 LANTAI 4
4.1.9.5.1 Polypropylene Random (PPR) PN - 20
4.1.9.5.1.1 Pipa diameter 20 mm Westpex M 194
4.1.9.5.1.2 Pipa diameter 25 mm Westpex M 38
4.1.9.5.1.3 Gate valve diameter 1/2" Kitz bh 16
4.1.9.5.1.4 Gate valve diameter 3/4" Kitz bh 16
4.1.9.5.1.5 Fitting dan assesories Westpex Ls 1
4.1.9.5.1.6 Alat bantu dan material batu Ls 1

4.1.9.6 LANTAI 5
4.1.9.6.1 Polypropylene Random (PPR) PN - 20
4.1.9.6.1.1 Pipa diameter 20 mm Westpex M 194
4.1.9.6.1.2 Pipa diameter 32 mm Westpex M 38
4.1.9.6.1.3 Gate valve diameter 1/2" Kitz bh 16
4.1.9.6.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.6.1.5 Alat bantu dan material batu Ls 1

4.1.9.7 LANTAI 6
4.1.9.7.1 Polypropylene Random (PPR) PN - 20
4.1.9.7.1.1 Pipa diameter 20 mm Westpex M 194
4.1.9.7.1.2 Pipa diameter 32 mm Westpex M 38
4.1.9.7.1.3 Gate valve diameter 1/2" Kitz bh 16
4.1.9.7.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.7.1.5 Alat bantu dan material batu Ls 1

4.1.9.8 LANTAI 7
4.1.9.8.1 Polypropylene Random (PPR) PN - 20
4.1.9.8.1.1 Pipa diameter 20 mm Westpex M 194
4.1.9.8.1.2 Pipa diameter 40 mm Westpex M 38
4.1.9.8.1.3 Gate valve diameter 1/2" Kitz bh 16
4.1.9.8.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.8.1.5 Alat bantu dan material batu Ls 1

4.1.9.9 LANTAI 8
4.1.9.9.1 Polypropylene Random (PPR) PN - 20
4.1.9.9.1.1 Pipa diameter 20 mm Westpex M 216
4.1.9.9.1.2 Pipa diameter 40 mm Westpex M 42
4.1.9.9.1.3 Gate valve diameter 1/2" Kitz bh 16
4.1.9.9.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.9.1.5 Alat bantu dan material batu Ls 1

4.1.9.10 LANTAI 9
4.1.9.10.1 Polypropylene Random (PPR) PN - 20
4.1.9.10.1.1 Pipa diameter 20 mm Westpex M 216

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 59
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.9.10.1.2 Pipa diameter 50 mm Westpex M 42


4.1.9.10.1.3 Gate valve diameter 1/2" Kitz bh 16
4.1.9.10.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.10.1.5 Alat bantu dan material batu Ls 1

4.1.9.11 LANTAI 10
4.1.9.11.1 Polypropylene Random (PPR) PN - 20
4.1.9.11.1.1 Pipa diameter 20 mm Westpex M 216
4.1.9.11.1.2 Pipa diameter 50 mm Westpex M 42
4.1.9.11.1.3 Gate valve diameter 1/2" Kitz bh 16
4.1.9.11.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.11.1.5 Alat bantu dan material batu Ls 1

4.1.9.12 LANTAI 11
4.1.9.12.1 Polypropylene Random (PPR) PN - 20
4.1.9.12.1.1 Pipa diameter 20 mm Westpex M 216
4.1.9.12.1.2 Pipa diameter 25 mm Westpex M 42
4.1.9.12.1.3 Gate valve diameter 1/2" Kitz bh 16
4.1.9.12.1.4 Gate valve diameter 3/4" Kitz bh 16
4.1.9.12.1.5 Fitting dan assesories Westpex Ls 1
4.1.9.12.1.6 Alat bantu dan material batu Ls 1

4.1.9.13 LANTAI 12
4.1.9.13.1 Polypropylene Random (PPR) PN - 20
4.1.9.13.1.1 Pipa diameter 20 mm Westpex M 162
4.1.9.13.1.2 Pipa diameter 32 mm Westpex M 42
4.1.9.13.1.3 Gate valve diameter 1/2" Kitz bh 12
4.1.9.13.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.13.1.5 Alat bantu dan material batu Ls 1

4.1.9.14 LANTAI 13
4.1.9.14.1 Polypropylene Random (PPR) PN - 20
4.1.9.14.1.1 Pipa diameter 20 mm Westpex M 162
4.1.9.14.1.2 Pipa diameter 32 mm Westpex M 42
4.1.9.14.1.3 Gate valve diameter 1/2" Kitz bh 12
4.1.9.14.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.14.1.5 Alat bantu dan material batu Ls 1

4.1.9.15 LANTAI 14
4.1.9.15.1 Polypropylene Random (PPR) PN - 20
4.1.9.15.1.1 Pipa diameter 20 mm Westpex M 81
4.1.9.15.1.2 Pipa diameter 32 mm Westpex M 27
4.1.9.15.1.3 Gate valve diameter 1/2" Kitz bh 6
4.1.9.15.1.4 Fitting dan assesories Westpex Ls 1
4.1.9.15.1.5 Alat bantu dan material batu Ls 1

4.1.9.16 Riser Supply dan Return Air Panas


4.1.9.16.1 Polypropylene Random (PPR) PN - 20
4.1.9.16.1.1 Pipa diameter 32 mm Westpex M 12
4.1.9.16.1.2 Pipa diameter 40 mm Westpex M 38
4.1.9.16.1.3 Pipa diameter 50 mm Westpex M 27
4.1.9.16.1.4 Pipa diameter 63 mm Westpex M 15
4.1.9.16.1.5 Pipa diameter 75 mm Westpex M 42
4.1.9.16.1.6 Gate valve diameter 50 mm 20 K Kitz bh 8
4.1.9.16.1.7 Gate valve diameter 32 mm 20 K Kitz bh 5
4.1.9.16.1.8 Buter fly Valve valve diameter 75 mm 20 K Kitz bh 3
4.1.9.16.1.9 Preasure Release Valve Dia Meter 2-1/2" MM Honeywell bh 1
4.1.9.16.1.10 Fitting dan assesories Westpex Ls 1
4.1.9.16.1.11 Alat bantu dan material batu Ls 1

4.1.10 SYSTEM KOLAM RENANG

4.1.10.1 Equipment kolam renang


4.1.10.1.1 Super II Pump 2 HP Hayward Hayward Bh 2,00
4.1.10.1.2 Inlet Bh 12,00
4.1.10.1.3 Vacuum Fitting Bh 2,00
4.1.10.1.4 Main Drain SP 1032 12 in x 12 in Bh 2,00
4.1.10.1.5 Pool Ladder 3 steps Bh 1,00
4.1.10.1.6 Vacuum Head 193 Bh 1,00
4.1.10.1.7 Vacuum Hose 50 ft Roll 1,00
4.1.10.1.8 Undarwater light LED + trafo + kabel Bh 11,00
4.1.10.1.9 Telescopic Handle 16 ft Bh 1,00
4.1.10.1.10 Leaf skimmer Bh 1,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 60
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.1.10.1.11 Pool Brush Bh 1,00


4.1.10.1.12 test kit Rainbow Bh 1,00
4.1.10.1.13 Electric Heater Bh 2,00
4.1.10.1.14 Pompa Submersible Ebara Bh 1,00
4.1.10.1.15 Biaya pengadaan alat bantu (keni, valve, dll) dan pemasangan Ls 0,90
4.1.10.1.16 Biaya pengadaan pipa dll dan sistem pemipaan kolam renang Ls 0,35
4.1.10.1.17 Shock treatment dan water treatment selama tiga (3) bulan Ls 1,00

4.1.10.2 Equipment kolam ikan lantai 1


4.1.10.2.1 Pompa Kolam ikan Ebara Bh 2,00
4.1.10.2.2 Filter water pond Bh 1,00
4.1.10.2.3 Inlet Bh 12,00
4.1.10.2.4 Undarwater light LED + trafo + kabel Bh 6,00
4.1.10.2.5 Biaya pengadaan alat bantu (keni, valve, dll) dan pemasangan Ls 0,90
4.1.10.2.6 Biaya pengadaan pipa dll dan sistem pemipaan kolam renang Ls 0,35

4.1.10.3 Equipment Onzen hot lantai Basement


4.1.10.3.1 Sirkulasi pump Ebara Bh 2,00
4.1.10.3.2 Sand Filter Bh 1,00
4.1.10.3.3 Inlet water nozzle Bh 10,00
4.1.10.3.4 Undarwater light LED + trafo + kabel Bh 6,00
4.1.10.3.5 Biaya pengadaan alat bantu (keni, valve, dll) dan pemasangan Ls 0,20
4.1.10.3.6 Biaya pengadaan pipa dll dan sistem pemipaan kolam renang Ls 0,20
4.1.10.3.7 Heat Pump Ls 1,00

4.1.10.4 Equipment Onzen Cool lantai Basement


4.1.10.4.1 Sirkulasi pump Ebara Bh 4,00
4.1.10.4.2 Sand Filter Bh 1,00
4.1.10.4.3 Inlet Bh 4,00
4.1.10.4.4 Undarwater light LED + trafo + kabel Bh 4,00
4.1.10.4.5 Biaya pengadaan alat bantu (keni, valve, dll) dan pemasangan Ls 0,20
4.1.10.4.6 Biaya pengadaan pipa dll dan sistem pemipaan kolam renang Ls 0,20

4.1.10.5 Equipment Jacuzzi Lt-14


4.1.10.5.1 Sirkulasi pump Ebara Bh 1,00
4.1.10.5.2 Air Pump Bh 1,00
4.1.10.5.3 Inlet water nozzle Bh 4,00
4.1.10.5.4 Inlet air nozzle Bh 2,00
4.1.10.5.5 Undarwater light LED + trafo + kabel Bh 1,00
4.1.10.5.6 Biaya pengadaan alat bantu (keni, valve, dll) dan pemasangan Ls 1,00
4.1.10.5.7 Biaya pengadaan pipa dll dan sistem pemipaan kolam renang Ls 1,00

4.2 SUB PEKERJAAN PEMADAM KEBAKARAN

4.2.1 PERALATAN UTAMA


4.2.1.1 MAIN FIRE PUMP -1 (ELECTRIC) Ebara unit 1,00
Type : End Suction
Kapasitas : 750 GPM
Head : 80 M/AQ
Speed : 2900 rpm
Daya listrik : 30 kw
Operasional :-
C/w kontrol panel, base plate, mounting, coupling vibration, isolator,
kabel power & kontrol dari panel kontrol ke pompa dan accessories
sesuai gambar dan spesifikasi teknis.

4.2.1.2 MAIN FIRE PUMP -2 (DIESEL) Ebara unit 1,00


Type : End Suction
Kapasitas : 750 GPM
Head : 80 M/AQ
Speed : 2900 rpm
Daya listrik :
Operasional :-
C/w kontrol panel, base plate, mounting, coupling vibration, isolator,
kabel power & kontrol dari panel kontrol ke pompa dan accessories
sesuai gambar dan spesifikasi teknis.

4.2.1.3 JOCKEY FIRE PUMP Grundfos unit 1,00


Type : Vertical Inline
Kapasitas : 50 GPM
Head : 90 M/AQ
Speed : 2900 rpm
Daya listrik : 4,3 Kw

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 61
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

Operasional :-
C/w kontrol panel, base plate, mounting, coupling vibration, isolator,
kabel power & kontrol dari panel kontrol ke pompa dan accessories
sesuai gambar dan spesifikasi teknis

4.2.2 RUANG POMPA


4.2.2.1 PEMIPAAN
4.2.2.1.1 Black Steel klas medium
4.2.2.1.1.1 Diameter 150 mm Spindo M 22,00
4.2.2.1.1.2 Diameter 100 mm Spindo M 7,00
4.2.2.1.1.3 Diameter 40 mm Spindo M 6,00
4.2.2.1.1.4 Diameter 25 mm (Provisional) Spindo M 9,00
4.2.2.1.2 bh 1,00
Pipa header diameter 200 mm, panjang 4,50 meter termasuk fitting-fitting, blind flange,
pelubangan, pengelasan, modifikasi pipa existing dan material bantu lainnya
4.2.2.1.3 bh 1,00
Pipa header diameter 200 mm, panjang 3,30 meter termasuk fitting-fitting, blind flange,
pelubangan, pengelasan, modifikasi pipa existing dan material bantu lainnya
4.2.2.1.4 Fitting dan assesories Galunggung Ls 1,00
4.2.2.1.5 Alat bantu dan material batu Ls 1,00

4.2.2.2 KATUP DAN ASESORIS


4.2.2.2.1 Butter Fly valve diameter 150 mm Kitz bh 17,00
4.2.2.2.2 Gate valve diameter 40 mm Kitz bh 2,00
4.2.2.2.3 Gate valve diameter 25 mm Kitz bh 2,00
4.2.2.2.4 Check valve diameter 150 mm Kitz bh 2,00
4.2.2.2.5 Check valve diameter 40 mm Kitz bh 1,00
4.2.2.2.6 Check valve diameter 25 mm Kitz bh 2,00
4.2.2.2.7 Strainer diameter 150 mm Kitz bh 2,00
4.2.2.2.8 Strainer diameter 40 mm Kitz bh 1,00
4.2.2.2.9 Flexible joint diameter 150 mm Tozen bh 4,00
4.2.2.2.10 Flexible joint diameter 40 mm Tozen bh 2,00
4.2.2.2.11 Pressure switch Omron bh 3,00
4.2.2.2.12 Pressure gauge Winter bh 9,00
4.2.2.2.13 Pressure relief valve diameter 100 mm lengkap dengan valve, pipa by pass dan set 1,00
aksesories lainnya sesuai gambar dan spesifikasi teknis
4.2.2.2.14 Pressure reducing valve diameter 150 mm lengkap dengan valve, pipa by pass dan set 2,00
aksesories lainnya sesuai gambar dan spesifikasi teknis
4.2.2.2.15 MCV Set diameter 150 mm lengkap dengan valve, pipa by pass dan aksesories lainnya set 2,00
sesuai gambar dan spesifikasi teknis
4.2.2.2.16 Fitting dan assesories Galunggung Ls 1,00
4.2.2.2.17 Alat bantu dan material batu Ls 1,00

4.2.3 FIRE HOSE CABINET Hooseki


lengkap dengan hose rack, fire hose, machino coupling,
landing valve, hydrant valve, hose nozzle, pelubangan
untuk fixture fire alarm, support, hanger dan
perlengkapan lainnya.

4.2.3.1 LANTAI BASEMENT TOWER 1 & 2 Hooseki unit 4,00


4.2.3.2 LANTAI 1 TOWER 1 Hooseki unit 2,00
4.2.3.3 LANTAI 2 TOWER 1 Hooseki unit 2,00
4.2.3.4 LANTAI 3 TOWER 1 Hooseki unit 2,00
4.2.3.5 LANTAI 4 ~ 14 TOWER 1 (TIPIKAL 11 LANTAI) Hooseki unit 22,00
4.2.3.6 LANTAI ATAP TOWER 1 Hooseki unit 1,00

4.2.4 OUTDOOR HYDRANT BOX, PILLAR DAN SIAMESSE Hooseki


4.2.4.1 Outdoor hydrant box lengkap hose nozzle, fire hose, coupling, unit 2,00
pondasi dan asesoris lainnya.
4.2.4.2 Hydrant pillar type two-way lengkap pondasi, pengkatupan dan Hooseki unit 2,00
box asesoris lainnya sesuai gambar dan spesifikasi.
4.2.4.3 Siamesse connection type two-way lengkap pondasi. Hooseki unit 2,00

4.2.5 HEAD SPRINKLER


4.2.5.1 LANTAI BASEMENT TOWER 1 & 2
4.2.5.1.1 Sprinkler tipe pendant Viking bh 111,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 62
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.2.5.1.2 Sprinkler tipe wall Viking bh 1,00


4.2.5.1.3 Sprinkler tipe upright Viking bh 105,00

4.2.5.2 LANTAI 1 TOWER 1


4.2.5.2.1 Sprinkler tipe pendant Viking bh 58,00
4.2.5.2.2 Sprinkler tipe wall Viking bh 2,00

4.2.5.3 LANTAI 2 TOWER 1


4.2.5.3.1 Sprinkler tipe pendant Viking bh 54,00
4.2.5.3.2 Sprinkler tipe wall Viking bh 2,00

4.2.5.4 LANTAI 3 TOWER 1


4.2.5.4.1 Sprinkler tipe pendant Viking bh 59,00
4.2.5.4.2 Sprinkler tipe wall Viking bh 2,00

4.2.5.5 LANTAI 4 ~ 11 TOWER 1 (TIPIKAL 8 LANTAI)


4.2.5.5.1 Sprinkler tipe pendant Viking bh 120,00
4.2.5.5.2 Sprinkler tipe wall Viking bh 144,00

4.2.5.6 LANTAI 12 TOWER 1


4.2.5.6.1 Sprinkler tipe pendant Viking bh 31,00
4.2.5.6.2 Sprinkler tipe wall Viking bh 14,00

4.2.5.7 LANTAI 13 TOWER 1


4.2.5.7.1 Sprinkler tipe pendant Viking bh 33,00
4.2.5.7.2 Sprinkler tipe wall Viking bh 14,00

4.2.5.8 LANTAI 14 TOWER 1


4.2.5.8.1 Sprinkler tipe pendant Viking bh 41,00
4.2.5.8.2 Sprinkler tipe wall Viking bh 5,00

4.2.6 PORTABLE FIRE EXTINGUISHER


4.2.6.1 LANTAI BASEMENT TOWER 1 & 2
4.2.6.1.1 Fire Extinguiser tipe Dry Chemical kapasitas 3,5 kg Hooseki bh 12,00
4.2.6.1.2 Fire Extinguiser tipe Dry Chemical kapasitas 5 kg Hooseki bh 1,00
4.2.6.1.3 Fire Extinguiser tipe CO2 kapasitas 5 kg Hooseki bh 1,00

4.2.6.2 LANTAI 1 TOWER 1


4.2.6.2.1 Fire Extinguiser tipe Dry Chemical kapasitas 3,5 kg Hooseki bh 3,00
4.2.6.2.2 Fire Extinguiser tipe CO2 kapasitas 3,5 kg Hooseki bh 1,00

4.2.6.3 LANTAI 2 TOWER 1


4.2.6.3.1 Fire Extinguiser tipe Dry Chemical kapasitas 3,5 kg Hooseki bh 3,00
4.2.6.3.2 Fire Extinguiser tipe CO2 kapasitas 3,5 kg Hooseki bh 1,00

4.2.6.4 LANTAI 3 TOWER 1


4.2.6.4.1 Fire Extinguiser tipe Dry Chemical kapasitas 3,5 kg Hooseki bh 3,00
4.2.6.4.2 Fire Extinguiser tipe CO2 kapasitas 3,5 kg Hooseki bh 1,00

4.2.6.5 LANTAI 4 ~ 14 TOWER 1 (TIPIKAL 11 LANTAI)


4.2.6.5.1 Fire Extinguiser tipe Dry Chemical kapasitas 3,5 kg Hooseki bh 22,00
4.2.6.5.2 Fire Extinguiser tipe CO2 kapasitas 3,5 kg Hooseki bh 11,00

4.2.6.6 LANTAI ATAP TOWER 1


4.2.6.6.1 Fire Extinguiser tipe Dry Chemical kapasitas 3,5 kg Hooseki bh 2,00
4.2.6.6.2 Fire Extinguiser tipe CO2 kapasitas 3,5 kg Hooseki bh 1,00

4.2.7 PEMIPAAN, KATUP DAN AKSESORIS


4.2.7.1 FIRE HYDRANT
Black Steel Pipe klass medium
4.2.7.1.1 LANTAI BASEMENT TOWER 1 DAN 2
4.2.7.1.1.1 Diameter 100 mm Spindo M 29,60
4.2.7.1.1.2 Diameter 65mm Spindo M 12,90
4.2.7.1.1.3 Diameter 40 mm (provisional) Spindo M 0,29
4.2.7.1.1.4 Butter Fly valve diameter 100 mm Kitz bh 0,10
4.2.7.1.1.5 Fitting dan assesories Galunggung Ls 0,05
4.2.7.1.1.6 Alat bantu dan material batu Ls 0,05

4.2.7.1.2 LANTAI 1-14 TOWER 1


4.2.7.1.2.1 Diameter 100 mm Spindo M 38,69
4.2.7.1.2.2 Diameter 65mm Spindo M 393,28
4.2.7.1.2.3 Diameter 40 mm (provisional) Spindo M

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 63
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.2.7.1.2.4 Butter Fly valve diameter 100 mm Kitz bh 0,10


4.2.7.1.2.5 Fitting dan assesories Galunggung Ls 0,35
4.2.7.1.2.6 Alat bantu dan material batu Ls 0,35

4.2.7.1.3 LANTAI ATAP TOWER 1


4.2.7.1.3.1 Diameter 80 mm Spindo M 14,00
4.2.7.1.3.2 Diameter 65 mm (provisional) Spindo M 3,00
4.2.7.1.3.3 Diameter 40 mm (provisional) Spindo M 3,00
4.2.7.1.3.4 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.1.3.5 Fitting dan assesories Galunggung Ls 1,00
4.2.7.1.3.6 Alat bantu dan material batu Ls 1,00

4.2.7.1.4 SHAFT/TEGAK
TOWER 1
4.2.7.1.4.1 Diameter 150 mm Spindo M 12,15
4.2.7.1.4.2 Diameter 125 mm Spindo M 4,35
4.2.7.1.4.3 Diameter 100 mm Spindo M 22,00
4.2.7.1.4.4 Diameter 40mm Spindo M 3,00
4.2.7.1.4.5 Automatic Air Vent Gala set 1
4.2.7.1.4.6 Butter Fly valve diameter 150 mm Kitz bh 1,00
4.2.7.1.4.7 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.1.4.8 Fitting dan assesories Galunggung Ls 0,50
4.2.7.1.4.9 Alat bantu dan material batu Ls 0,50

4.2.7.2 FIRE SPRINKLER


Black Steel Pipe klass medium
4.2.7.2.1 LANTAI BASEMENT TOWER 1 DAN 2
4.2.7.2.1.1 Dameter 100mm Spindo M 12,19
4.2.7.2.1.2 Diameter 80mm Spindo M 2,63
4.2.7.2.1.3 Diameter 65mm Spindo M 1,66
4.2.7.2.1.4 Diameter 50mm Spindo M 3,51
4.2.7.2.1.5 Diameter 40mm Spindo M 10,14
4.2.7.2.1.6 Diameter 32mm Spindo M 7,51
4.2.7.2.1.7 Diameter 25mm Spindo M 74,59
4.2.7.2.1.8 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.2.1.9 Flow Switch Honeywell bh 1,00
4.2.7.2.1.10 Fitting dan assesories Galunggung Ls 0,10
4.2.7.2.1.11 Alat bantu dan material batu Ls 0,10

4.2.7.2.2 LANTAI 1 TOWER 1


4.2.7.2.2.1 Dameter 100mm Spindo M
4.2.7.2.2.2 Diameter 80mm Spindo M 2,05
4.2.7.2.2.3 Diameter 65mm Spindo M 1,66
4.2.7.2.2.4 Diameter 50mm Spindo M 0,68
4.2.7.2.2.5 Diameter 40mm Spindo M 1,27
4.2.7.2.2.6 Diameter 32mm Spindo M 1,66
4.2.7.2.2.7 Diameter 25mm Spindo M 15,70
4.2.7.2.2.8 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.2.2.9 Flow Switch Honeywell bh 1,00
4.2.7.2.2.10 Fitting dan assesories Galunggung Ls 0,10
4.2.7.2.2.11 Alat bantu dan material batu Ls 0,10

4.2.7.2.3 LANTAI 2 TOWER 1


4.2.7.2.3.1 Dameter 100mm Spindo M
4.2.7.2.3.2 Diameter 80mm Spindo M 3,32
4.2.7.2.3.3 Diameter 65mm Spindo M 1,66
4.2.7.2.3.4 Diameter 50mm Spindo M 1,27
4.2.7.2.3.5 Diameter 40mm Spindo M 0,59
4.2.7.2.3.6 Diameter 32mm Spindo M 1,66
4.2.7.2.3.7 Diameter 25mm Spindo M 17,16
4.2.7.2.3.8 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.2.3.9 Flow Switch Honeywell bh 1,00
4.2.7.2.3.10 Fitting dan assesories Galunggung Ls 0,10
4.2.7.2.3.11 Alat bantu dan material batu Ls 0,10

4.2.7.2.4 LANTAI 3 TOWER 1


4.2.7.2.4.1 Dameter 100mm Spindo M
4.2.7.2.4.2 Diameter 80mm Spindo M 3,12
4.2.7.2.4.3 Diameter 65mm Spindo M 1,66
4.2.7.2.4.4 Diameter 50mm Spindo M 0,68
4.2.7.2.4.5 Diameter 40mm Spindo M 1,66
4.2.7.2.4.6 Diameter 32mm Spindo M 0,49
4.2.7.2.4.7 Diameter 25mm Spindo M 30,62
4.2.7.2.4.8 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.2.4.9 Flow Switch Honeywell bh 1,00
4.2.7.2.4.10 Fitting dan assesories Galunggung Ls 0,10
4.2.7.2.4.11 Alat bantu dan material batu Ls 0,10

4.2.7.2.5 LANTAI 4S/D 11 TOWER 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 64
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.2.7.2.5.1 Dameter 100mm Spindo M


4.2.7.2.5.2 Diameter 80mm Spindo M 24,75
4.2.7.2.5.3 Diameter 65mm Spindo M 243,00
4.2.7.2.5.4 Diameter 50mm Spindo M 33,00
4.2.7.2.5.5 Diameter 40mm Spindo M 97,50
4.2.7.2.5.6 Diameter 32mm Spindo M 17,00
4.2.7.2.5.7 Diameter 25mm Spindo M 1020,75
4.2.7.2.5.8 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.2.5.9 Flow Switch Honeywell bh 1,00
4.2.7.2.5.10 Fitting dan assesories Galunggung Ls 0,75
4.2.7.2.5.11 Alat bantu dan material batu Ls 0,75

4.2.7.2.6 LANTAI 12S/D 13 TOWER 1


4.2.7.2.6.1 Dameter 100mm Spindo M
4.2.7.2.6.2 Diameter 80mm Spindo M 9,00
4.2.7.2.6.3 Diameter 65mm Spindo M 81,00
4.2.7.2.6.4 Diameter 50mm Spindo M 11,00
4.2.7.2.6.5 Diameter 40mm Spindo M 33,00
4.2.7.2.6.6 Diameter 32mm Spindo M 9,00
4.2.7.2.6.7 Diameter 25mm Spindo M 341,00
4.2.7.2.6.8 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.2.6.9 Flow Switch Honeywell bh 1,00
4.2.7.2.6.10 Fitting dan assesories Galunggung Ls 1,00
4.2.7.2.6.11 Alat bantu dan material batu Ls 1,00

4.2.7.2.7 LANTAI 14 TOWER 1


4.2.7.2.7.1 Dameter 100mm Spindo M
4.2.7.2.7.2 Diameter 80mm Spindo M 5,00
4.2.7.2.7.3 Diameter 65mm Spindo M 41,00
4.2.7.2.7.4 Diameter 50mm Spindo M 6,00
4.2.7.2.7.5 Diameter 40mm Spindo M 17,00
4.2.7.2.7.6 Diameter 32mm Spindo M 5,00
4.2.7.2.7.7 Diameter 25mm Spindo M 171,00
4.2.7.2.7.8 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.2.7.9 Flow Switch Honeywell bh 1,00
4.2.7.2.7.10 Fitting dan assesories Galunggung Ls 1,00
4.2.7.2.7.11 Alat bantu dan material batu Ls 1,00

4.2.7.2.8 SHAFT/TEGAK
TOWER 1
4.2.7.2.8.1 Diameter 150 mm Spindo M 6,00
4.2.7.2.8.2 Diameter 125 mm Spindo M 4,00
4.2.7.2.8.3 Diameter 100 mm Spindo M 22,00
4.2.7.2.8.4 Diameter 40mm Spindo M 3,00
4.2.7.2.8.5 Automatic Air Vent Gala set 1
4.2.7.2.8.6 Butter Fly valve diameter 150 mm Kitz bh 1,00
4.2.7.2.8.7 Butter Fly valve diameter 100 mm Kitz bh 1,00
4.2.7.2.8.8 Fitting dan assesories Galunggung Ls 0,50
4.2.7.2.8.9 Alat bantu dan material batu Ls 0,50

4.2.7.3 PEKERJAAN LUAR


Termasuk galian, urugan, dan bahan pelindung pipa.
4.2.7.3.1 FIRE HYDRANT
4.2.7.3.1.1 Diameter 100 mm Spindo M 92,00
4.2.7.3.1.2 Gate valve diameter 100 mm (Pillar Hydrant) Kitz bh 3,00
4.2.7.3.1.3 Check valve diameter 100 mm (Siamesse Connection) Kitz bh 1,00
4.2.7.3.1.4 Fitting dan assesories Galunggung Ls 1,00
4.2.7.3.1.5 Alat bantu dan material batu Ls 1,00

4.2.7.4 DRAIN SPRINKLER


Black Steel Pipe klass medium
4.2.7.4.1 LANTAI BASEMENT TOWER 1 & 2
4.2.7.4.1.1 Diameter 25 mm Spindo M 4,00
4.2.7.4.1.2 Test drain valve diameter 25 mm Kitz bh 3,00
4.2.7.4.1.3 Fitting dan assesories Galunggung Ls 1,00
4.2.7.4.1.4 Alat bantu dan material batu Ls 1,00

4.2.7.4.2 LANTAI 1 TOWER 1


4.2.7.4.2.1 Diameter 25 mm Spindo M 4,00
4.2.7.4.2.2 Test drain valve diameter 25 mm Kitz bh 1,00
4.2.7.4.2.3 Fitting dan assesories Galunggung Ls 1,00
4.2.7.4.2.4 Alat bantu dan material batu Ls 1,00

4.2.7.4.3 LANTAI 2 TOWER 1


4.2.7.4.3.1 Diameter 25 mm Spindo M 4,00
4.2.7.4.3.2 Test drain valve diameter 25 mm Kitz bh 1,00
4.2.7.4.3.3 Fitting dan assesories Galunggung Ls 1,00
4.2.7.4.3.4 Alat bantu dan material batu Ls 1,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 65
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.2.7.4.4 LANTAI 3 TOWER 1


4.2.7.4.4.1 Diameter 25 mm Spindo M 4,00
4.2.7.4.4.2 Test drain valve diameter 25 mm Kitz bh 1,00
4.2.7.4.4.3 Fitting dan assesories Galunggung Ls 1,00
4.2.7.4.4.4 Alat bantu dan material batu Ls 1,00

4.2.7.4.5 LANTAI 4 ~ 11 TOWER 1 (VOLUME SUDAH TERMASUK 8 LANTAI)


4.2.7.4.5.1 Diameter 25 mm Spindo M 32,00
4.2.7.4.5.2 Test drain valve diameter 25 mm Kitz bh 8,00
4.2.7.4.5.3 Fitting dan assesories Galunggung Ls 1,00
4.2.7.4.5.4 Alat bantu dan material batu Ls 1,00

4.2.7.4.6 LANTAI 12 TOWER 1


4.2.7.4.6.1 Diameter 25 mm Spindo M 4,00
4.2.7.4.6.2 Test drain valve diameter 25 mm Kitz bh 1,00
4.2.7.4.6.3 Fitting dan assesories Galunggung Ls 1,00
4.2.7.4.6.4 Alat bantu dan material batu Ls 1,00

4.2.7.4.7 LANTAI 13 TOWER 1


4.2.7.4.7.1 Diameter 25 mm Spindo M 4,00
4.2.7.4.7.2 Test drain valve diameter 25 mm Kitz bh 1,00
4.2.7.4.7.3 Fitting dan assesories Galunggung Ls 1,00
4.2.7.4.7.4 Alat bantu dan material batu Ls 1,00

4.2.7.4.8 LANTAI 14 TOWER 1


4.2.7.4.8.1 Diameter 25 mm Spindo M 4,00
4.2.7.4.8.2 Test drain valve diameter 25 mm Kitz bh 1,00
4.2.7.4.8.3 Fitting dan assesories Galunggung Ls 1,00
4.2.7.4.8.4 Alat bantu dan material batu Ls 1,00

4.2.7.4.9 SHAFT/TEGAK
TOWER 1
4.2.7.4.9.1 Diameter 50 mm Spindo M 15,00
4.2.7.4.9.2 Fitting dan assesories Galunggung Ls 0,51
4.2.7.4.9.3 Alat bantu dan material batu Ls 0,51

4.2.8 BRANCH CONTROL VALVE


Branch control valve set lengkap dengan indicating tipe flow control valve w/ monitor
switch, inspector test valve, sight glass, drain valve, water flow switch, pemipaan dan
aksesories lainnya sesuai gambar dan spesifikasi teknis
4.2.8.1 LANTAI BASEMENT TOWER 1 & 2
4.2.8.1.1 BCV Set diameter 150 mm Hooseki set 1,00

4.2.8.2 LANTAI 1 ~ 14 TOWER 1 & 2


4.2.8.2.1 BCV Set diameter 80 mm Hooseki set 15

4.3 SUB TOTAL PEKERJAAN MVAC

4.3.1 AC LANTAI BASEMENT


4.3.1.1 Peralatan Utama
Pengadaan Unit

4.3.1.1.1 Merk / Model : Split Wall Standart Daikin - R32 set 1


Type & Cap. : 0,5 PK (5,000 Btu/Hr)

4.3.1.1.2 Merk / Model : Split Wall Standart Daikin - R32 set 2


Type & Cap. : 1 PK (9.000 Btu/Hr)

4.3.1.1.3 Merk / Model : Split Wall Standart Daikin - R32 set 4


Type & Cap. : 2 PK (18.000 Btu/Hr)

4.3.1.1.4 Merk / Model : Split Wall Standart Daikin - R32 set 5


Type & Cap. : 2,5PK (24.000 Btu/Hr)

4.3.1.1.5 Merk / Model : Split Duct Standart York - R407C set 2


Type & Cap. : 3 PK (26.600 Btuh/Hr)

4.3.1.2 Ongkos Pasang AC

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 66
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.1.2.1 0,5PK set 1


4.3.1.2.2 1PK set 2
4.3.1.2.3 2PK set 4
4.3.1.2.4 2,5PK set 5
4.3.1.2.4 3PK set 2

4.3.1.3 Pengadaan Exhaust Fan


4.3.1.3.1 Axial Fan : 5,000 cfm Smart Air unit 1
4.3.1.3.2 Axial Fan : 6,000 cfm Smart Air unit 1
4.3.1.3.3 Axial fan : 4,600 cfm Smart Air unit 1
4.3.1.3.4 Ceiling Fan : 50 cfm Vanco unit 2
4.3.1.3.5 Ceiling : 155 cfm Vanco unit 1

4.3.1.4 Pekerjaan Ducting


4.3.1.4.1 Ducting Bahan Pu First Duct m2 78
4.3.1.4.2 BJLS50 Lokfom m2 20
4.3.1.4.3 BJLS60 Lokfom m2 42
4.3.1.4.4 BJLS80 Lokfom m2 20
4.3.1.4.5 Drain Pan Lokfom bh 2
4.3.1.4.6 Plenum First Duct bh 2
4.3.1.4.7 Filter & Frame Local bh 2
4.3.1.4.8 hanger suport Ducting Local lot 2
4.3.1.4.9 bracket outdoor Local unit 14
4.3.1.4.10 Fleksible Duct 10" Masterflex / Bataviaflex mtr 21

4.3.1.5 Pekerjaan Grille


4.3.1.5.1 1800 x 100 M'Cond bh 2
4.3.1.5.2 900 x 100 M'Cond bh 4
4.3.1.5.3 650 x 150 M'Cond bh 20
4.3.1.5.4 500 x 100 M'Cond bh 15
4.3.1.5.5 400 x 100 M'Cond bh 18
4.3.1.5.6 250 x 200 M'Cond bh 9
4.3.1.5.7 250 x 150 M'Cond bh 3
4.3.1.5.8 150 x 100 M'Cond bh 6

4.3.1.6 Pekerjaan Louver


4.3.1.6.1 300 x 200 M'Cond bh 2

4.3.1.7 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.1.7.1 3/8X1/4 Denji + K-flex m 45
4.3.1.7.2 1/2x1/4 Denji + K-flex m 88
4.3.1.7.3 5/8 x1/4 Denji + K-flex m 115
4.3.1.7.4 5/8 x 3/8 Denji + K-flex m 45
4.3.1.7.5 Fittings Denji + K-flex lot 1

4.3.1.8 Pekerjaan Pipa Drain


4.3.1.8.1 Ø3/4" Intilon m 13
4.3.1.8.2 Fittings Rucika lot 0

4.3.1.9 Pekerjaan Listrik


4.3.1.9.1 Kabel power AC 4 x 6 mm Kabelindo / setara 4 Besar mtr 20
4.3.1.9.2 Kabel power AC 3 x 2.5 mm Kabelindo / setara 4 Besar mtr 139
4.3.1.9.3 Kabel Kontrol 3 x 1.5 mm Kabelindo / setara 4 Besar mtr 180
4.3.1.9.4 Kabel Thermostat 5 x 1.5 mm Kabelindo / setara 4 Besar mtr 20
4.3.1.9.5 Kabel Power Exhaust 4 x4 mm Kabelindo / setara 4 Besar mtr 80
4.3.1.9.6 Kabel Power Exhaust 3 x 2.5 mm Kabelindo / setara 4 Besar mtr 200

4.3.1.10 Pekerjaan Lain2


4.3.1.10.1 Freon Dupont kg 30
4.3.1.10.2 Test Press - Flushing Instalasi dgn N2 unit 14

4.3.2 AC LANTAI SATU


4.3.2.1 Peralatan Utama
Pengadaan AC

4.3.2.1.1 Merk / Model : Split Wall Standart Daikin - R32 set 2


Kap : 1 PK (9.000 Btu/Hr)

4.3.2.1.2 Merk / Model : Split Duct Standart YORK - R407C set 2


Kap : 20 PK (200.000 Btu/Hr)

4.3.2.2 Ongkos Pasang AC

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 67
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.2.2.1 1PK set 2


4.3.2.2.2 20PK set 2

4.3.2.3 Pengadaan Exhaust fan


4.3.2.3.1 Cabinet Fan : 400 cfm Smart Air unit 1
4.3.2.3.2 Ceiling Fan : 50cfm Vanco unit 2

4.3.2.4 Pekerjaan Ducting


4.3.2.4.1 Ducting Bahan Pu First Duct m2 205
4.3.2.4.2 BJLS60 Lokfom m2 20
4.3.2.4.3 Drain Pan Lokfom bh 2
4.3.2.4.4 Plenum First Duct bh 2
4.3.2.4.5 Filter & Frame Local bh 2
4.3.2.4.6 Hanger/Support Unit FCU Local lot 1
4.3.2.4.7 Bracket outdoor Local lot 6
4.3.2.4.8 Fleksible Duct 10" Masterflex / Bataviaflex mtr 90

4.3.2.5 Pekerjaan Pipa Drain


4.3.2.5.1 Ø3/4" Intilon m 90
4.3.2.5.2 Ø1" Intilon m 15
4.3.2.5.3 Fittings Rucika lot 0

4.3.2.6 Pekerjaan Grille


4.3.2.6.1 800X200 M'Cond bh 24
4.3.2.6.2 200X100 M'Cond bh 4

4.3.2.7 pekerjaan Diffuser


4.3.2.7.1 300X300 M'Cond bh 30

4.3.2.8 Pekerjaan Louver


4.3.2.8.1 500X250 M'Cond bh 2
4.3.2.8.2 400X200 M'Cond bh 1

4.3.2.9 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.2.9.1 3/8X1/4 Denji + K-flex m 51
4.3.2.9.2 1/2X1/4 Denji + K-flex m 17
4.3.2.9.3 1 3/8X5/8 Denji + K-flex m 35
4.3.2.9.4 Fittings Denji + K-flex lot 1

4.3.2.10 Pekerjaan Listrik


4.3.2.10.1 Kabel power AC 4 x 10 mm Kabelindo / setara 4 Besar mtr 35
4.3.2.10.2 Kabel power AC 3 x 2.5 mm Kabelindo / setara 4 Besar mtr 115
4.3.2.10.3 Kabel Kontrol 3 x 1.5 mm Kabelindo / setara 4 Besar mtr 120
4.3.2.10.4 Kabel Thermostat 5 x 1.5 mm Kabelindo / setara 4 Besar mtr 30
4.3.2.10.5 Kabel Power Exhaust 3 x 2.5 mm Kabelindo / setara 4 Besar mtr 50
4.3.2.10.6 Kabel Power Exhaust 4 x 2.5 mm Kabelindo / setara 4 Besar mtr 40
4.3.2.10.7 Panel AC Panel Elektrik set 1

4.3.2.11 Pekerjaan Lain2


4.3.2.11.1 Freon Dupont kg 45
4.3.2.11.2 Test Press - Flusning Instalasi dgn N2 unit 6

4.3.3 AC LANTAI DUA


Peralatan Utama
4.3.3.1 Pengadaan AC

4.3.3.1.1 Model : Split Wall Standart Daikin - R32 set 1


Kap : 1 PK (9.000 Btu/Hr)

4.3.3.1.2 Model : Split Duct Standart Daikin - R32 set 3


Kap : 10 PK (96.000 Btuh/Hr)

4.3.3.1.3 Model : Split Duct Standart York - R407C set 1


Kap : 12 PK (125.000 Btuh/Hr)

4.3.3.2 Ongkos Pasang Unit AC


4.3.3.2.1 1PK set 1
4.3.3.2.2 10PK set 3
4.3.3.2.3 12PK set 1

4.3.3.3 Pengadaan Exhaust fan


4.3.3.3.1 Cabinet Fan : 400cfm Smart Air unit 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 68
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.3.4 Pekerjaan Ducting


4.3.3.4.1 Ducting Bahan Pu First Duct m2 260
4.3.3.4.2 Drain Pan Lokfom bh 6
4.3.3.4.3 Plenum First Duct bh 3
4.3.3.4.4 Filter & Frame Local bh 3
4.3.3.4.5 Hanger/Support Unit FCU Local lot 1
4.3.3.4.6 Bracket Suppot Local unit 4

4.3.3.5 Pekerjaan Grille


4.3.3.5.1 600x500 M'Cond bh 4
4.3.3.5.2 450x400 M'Cond bh 3
4.3.3.5.3 400x400 M'Cond bh 12
4.3.3.5.4 150X100 M'Cond bh 4

4.3.3.6 Pekerjaan Diffuser


4.3.3.6.1 300X300 M'Cond BH 52

4.3.3.7 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
7 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.3.7.1 3/8X1/4 Denji + K-flex mtr 15
4.3.3.7.2 5/8x 1 3/8 Denji + K-flex m 55
4.3.3.7.3 Fittings Denji + K-flex lot 1

4.3.3.8 Pekerjaan Pipa Drainage


4.3.3.8.1 Ø3/4" Intilon m 100
4.3.3.8.2 Ø1" Intilon m 5
4.3.3.8.3 Fittings Rucika lot 1

4.3.3.9 Pekerjaan Listrik


4.3.3.9.1 Kabel power AC 4 x 6 mm Kabelindo / setara 4 Besar mtr 50
4.3.3.9.2 Kabel power AC 3 x 2.5 mm Kabelindo / setara 4 Besar mtr 45
4.3.3.9.3 Kabel power Fan 4 x 2.5 mm Kabelindo / setara 4 Besar mtr 80
4.3.3.9.4 Kabel Kontrol 3 x 1.5 mm Kabelindo / setara 4 Besar mtr 30
4.3.3.9.5 Kabel Thermostat 5 x 1.5 mm Kabelindo / setara 4 Besar mtr 40

4.3.3.10 Pekerjaan Lain2


4.3.3.10.1 Freon Dupont kg 40
4.3.3.10.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.4 AC LANTAI TIGA


4.3.4.1 Peralatan Utama
Pengdaaan Unit AC

4.3.4.1.1 Model : Split Duct Standart York - R407C set 1


Kap : 5 PK (48.00Btuh/Hr)

4.3.4.1.2 Model : Split Duct Standart York - R407C set 6


kap : 4 PK (36.00Btuh/Hr)

4.3.4.1.3 Model : Split Duct Standart York - R407C set 2


Kap : 2 PK (18.000 Btuh/Hr)

4.3.4.1.4 Model : Split Wall Standart Daikin - R32 set 1


Kap : 1,5 PK (12.000 Btu/Hr)

4.3.4.1.4 Model : Split Wall Standart Daikin - R32 set 1


Kap : 1 PK (9.000 Btu/Hr)

4.3.4.2 Ongkos Pasang AC


4.3.4.2.1 5PK set 1
4.3.4.2.2 4PK set 6
4.3.4.2.3 2PK set 2
4.3.4.2.4 1PK set 1
4.3.4.2.5 1,5PK set 2

4.3.4.3 Pengadaan Exhaust fan


4.3.4.3.1 Cabinet Fan : 400CFM Smart Air unit 1
4.3.4.3.2 Ventilating :217CFM Smart Air unit 1

4.3.4.4 Pekerjaan Instalasi Ducting


4.3.4.4.1 Ducting Bahan Pu First Duct m2 110
4.3.4.4.2 Drain Pan Lokfom bh 7

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 69
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.4.4.3 Plenum First Duct bh 7


4.3.4.4.4 Filter & Frame Local bh 7
4.3.4.4.5 Hanger/Support Unit FCU Local lot 1
4.3.4.4.6 Bracket Suppot Local lot 7

4.3.4.5 Pekerjaan Grille


4.3.4.5.1 1200X150 M'Cond bh 18
4.3.4.5.2 150X100 M'Cond bh 4
4.3.4.5.3 650X350 M'Cond bh 6

4.3.4.6 Pekerjaan Diffuser


4.3.4.6.1 300X300 M'Cond BH 32

4.3.4.7 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.4.7.1 3/8X3/4 Denji + K-flex m 45
4.3.4.7.2 3/8X5/8 Denji + K-flex m 85
4.3.4.7.3 1/4X3/8 Denji + K-flex m 30
4.3.4.7.4 Fittings Denji + K-flex lot 1

4.3.4.8 Pekerjaan Pipa Drain


4.3.4.8.1 Ø3/4" Intilon m 180
4.3.4.8.2 Ø1" Intilon m 14
4.3.4.8.3 Fittings Rucika lot 1

4.3.4.9 Pekerjaan Listrik


4.3.4.9.1 Kabel power AC 4 x 4 mm Kabelindo / setara 4 Besar mtr 250
4.3.4.9.2 Kabel power Fan 4 x 2.5 mm Kabelindo / setara 4 Besar mtr 120
4.3.4.9.3 Kabel Kontrol 3 x 1.5 mm Kabelindo / setara 4 Besar mtr 90
4.3.4.9.4 Kabel Power Fan 4 x 2.5 mm Kabelindo / setara 4 Besar mtr 80
4.3.4.9.5 Kabel Thermostat 5 x 1.5 mm Kabelindo / setara 4 Besar mtr 65
4.3.4.9.6 Kabel Power Exhaust 3 x 2.5 mm Kabelindo / setara 4 Besar mtr 75

4.3.4.10 Pekerjaan Lain2


4.3.4.10.1 Freon Dupont kg 75
4.3.4.10.2 Test Press - Flushing dgn Nitrogen lot 1

4.3.5 AC LANTAI EMPAT


4.3.5.1 Peralatan Utama
Pengadaan Unit AC

4.3.5.1.1 Model : Split Wall Standart Daikin -R32 set 16


Kap. : 1,5 PK (12.000 Btu/Hr)

4.3.5.1.2 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

4.3.5.2 Ongkos Pasang AC


4.3.5.2.1 1 1/2 Pk set 16
4.3.5.2.2 2 Pk set 2

4.3.5.3 Pengadaan Exhaust fan


4.3.5.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.5.4 Pekerjaan Ducting


4.3.5.4.1 Ducting Bahan Pu First Duct m2 30
4.3.5.4.2 Drain Pan Lokfom bh 2
4.3.5.4.3 Plenum First Duct bh 2
4.3.5.4.4 Filter & Frame Local bh 2
4.3.5.4.5 Hanger/Support Unit FCU Local lot 1
4.3.5.4.6 Bracket Suppot Local lot 2

4.3.5.5 Pekerjaan Grille


4.3.5.5.1 1000x75 M'Cond bh 8

4.3.5.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.5.6.1 3/8X1/4 Denji + K-flex m 290
4.3.5.6.2 1/4x1/2 Denji + K-flex m 40
4.3.5.6.3 Fittings Denji + K-flex lot 1

4.3.5.7 Pekerjaan Pipa Drain


4.3.5.7.1 Ø3/4" Intilon m 108
4.3.5.7.2 Fittings Rucika lot 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 70
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.5.8 Pekerjaan Lain2


4.3.5.8.1 Freon R410 Dupont kg 31
4.3.5.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.6 AC LANTAI LIMA


4.3.6.1 Peralatan Utama
Pengadaan Unit AC

4.3.6.1.1 Model : Split Wall Standart Daikin -R32 set 16


Kap : 1,5 PK (12.000 Btu/Hr)

4.3.6.1.2 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

4.3.6.2 Ongkos Pasang AC


4.3.6.2.1 1 1/2 Pk set 16
4.3.6.2.2 2 Pk set 2

4.3.6.3 Pengadaan Exhaust fan


4.3.5.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.6.4 Pekerjaan Ducting


4.3.6.4.1 Ducting Bahan Pu First Duct m2 30
4.3.6.4.2 Drain Pan Lokfom bh 2
4.3.6.4.3 Plenum First Duct bh 2
4.3.6.4.4 Filter & Frame Local bh 2
4.3.6.4.5 Hanger/Support Unit FCU Local lot 1
4.3.6.4.6 Bracket Suppot Local lot 2

4.3.6.5 Pekerjaan Grille


4.3.6.5.1 1000x75 M'Cond bh 8

4.3.6.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.6.6.1 3/8X1/4 Denji + K-flex m 290
4.3.6.6.2 1/4x1/2 Denji + K-flex m 60
4.3.6.6.3 Fittings Denji + K-flex lot 1

4.3.6.7 Pekerjaan Pipa Drain


4.3.6.7.1 Ø3/4" Intilon m 90
4.3.6.7.2 Fittings Rucika lot 1

4.3.6.8 Pekerjaan Lain2


4.3.6.8.1 Freon Dupont kg 30
4.3.6.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.7 AC LANTAI ENAM


4.3.7.1 Peralatan Utama
Pengadaan Unit AC

4.3.7.1.1 Model : Split Wall Standart Daikin -R32 set 16


Kap : 1,5 PK (12.000 Btu/Hr)

4.3.7.1.2 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

4.3.7.2 Ongkos Pasang AC


4.3.7.2.1 1 1/2 Pk set 16
4.3.7.2.2 2 Pk set 2

4.3.7.3 Pengadaan Exhaust fan


4.3.7.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.7.4 Pekerjaan Ducting


4.3.7.4.1 Ducting Bahan Pu First Duct m2 30
4.3.7.4.2 Drain Pan Lokfom bh 2
4.3.7.4.3 Plenum First Duct bh 2
4.3.7.4.4 Filter & Frame Local bh 2
4.3.7.4.5 Hanger/Support Unit FCU Local lot 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 71
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.7.4.6 Bracket Suppot Local lot 2

4.3.7.5 Pekerjaan Grille


4.3.7.5.1 1000x75 M'Cond bh 8

4.3.7.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.7.6.1 3/8X1/4 Denji + K-flex m 290
4.3.7.6.2 1/4x1/2 Denji + K-flex m 40
4.3.7.6.3 Fittings Denji + K-flex lot 1

4.3.7.7 Pekerjaan Pipa Drain


4.3.7.7.1 Ø3/4" Intilon m 140
4.3.7.7.2 Fittings Rucika lot 1

4.3.7.8 Pekerjaan Lain2


4.3.7.8.1 Freon Dupont kg 30
4.3.7.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.8 AC LANTAI TUJUH


4.3.8.1 Peralatan Utama
Pengadaan Unit AC

4.3.8.1.1 Model : Split Wall Standart Daikin -R32 set 16


Kap : 1,5 PK (12.000 Btu/Hr)

4.3.8.1.2 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

4.3.8.2 Ongkos Pasang AC


4.3.8.2.1 1 1/2 Pk set 16
4.3.8.2.2 2 Pk set 2

4.3.8.3 Pengadaan Exhaust fan


4.3.8.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.8.4 Pekerjaan Ducting


4.3.8.4.1 Ducting Bahan Pu First Duct m2 30
4.3.8.4.2 Drain Pan Lokfom bh 2
4.3.8.4.3 Plenum First Duct bh 2
4.3.8.4.4 Filter & Frame Local bh 2
4.3.8.4.5 Hanger/Support Unit FCU Local lot 1
4.3.8.4.6 Bracket Suppot Local lot 2

4.3.8.5 Pekerjaan Grille


4.3.8.5.1 500x500 M'Cond bh
4.3.8.5.2 1000x75 M'Cond bh 8

4.3.8.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.8.6.1 3/8X1/4 Denji + K-flex m 290
4.3.8.6.2 1/4x1/2 Denji + K-flex m 60
4.3.8.6.3 Fittings Denji + K-flex lot 1

4.3.8.7 Pekerjaan Pipa Drain


4.3.8.7.1 Ø3/4" Intilon m 140
4.3.8.7.2 Fittings Rucika lot 1

4.3.8.8 Pekerjaan Lain2


4.3.8.8.1 Freon Dupont kg 30
4.3.8.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.9 AC LANTAI DELAPAN


4.3.9.1 Peralatan Utama
Pengadaan Unit AC

4.3.9.1.1 Model : Split Wall Standart Daikin -R32 set 16


Kap : 1,5 PK (12.000 Btu/Hr)

4.3.9.1.2 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 72
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.9.2 Ongkos Pasang AC


4.3.9.2.1 1 1/2 Pk set 16
4.3.9.2.2 2 Pk set 2

4.3.9.3 Pengadaan Exhaust fan


4.3.9.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.9.4 Pekerjaan Ducting


4.3.9.4.1 Ducting Bahan Pu First Duct m2 30
4.3.9.4.2 Drain Pan Lokfom bh 2
4.3.9.4.3 Plenum First Duct bh 2
4.3.9.4.4 Filter & Frame Local bh 2
4.3.9.4.5 Hanger/Support Unit FCU Local lot 1
4.3.9.4.6 Bracket Suppot Local lot 22

4.3.9.5 Pekerjaan Grille


4.3.9.5.1 1000x75 M'Cond bh 8
4.3.9.5.2 500x500 M'Cond bh

4.3.9.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.9.6.1 3/8X1/4 Denji + K-flex m 290
4.3.9.6.2 1/4x1/2 Denji + K-flex m 40
4.3.9.6.3 Fittings Denji + K-flex lot 1

4.3.9.7 Pekerjaan Pipa Drain


4.3.9.7.1 Ø3/4" Intilon m 140
4.3.9.7.2 Fittings Rucika lot 1

4.3.9.8 Pekerjaan Lain2


4.3.9.8.1 Freon Dupont kg 30
4.3.9.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.10 LANTAI SEMBILAN


4.3.10.1 Peralatan Utama
Pengadaan Unit AC

4.3.10.1.1 Model : Split Wall Standart Daikin -R32 set 16


Kap : 1,5 PK (12.000 Btu/Hr)

4.3.10.1.2 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

4.3.10.2 Ongkos Pasang AC


4.3.10.2.1 1 1/2 Pk set 16
4.3.10.2.2 2 Pk set 2

4.3.10.3 Pengadaan Exhaust fan


4.3.10.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.10.4 Pekerjaan Ducting


4.3.10.4.1 Ducting Bahan Pu First Duct m2 30
4.3.10.4.2 Drain Pan Lokfom bh 2
4.3.10.4.3 Plenum First Duct bh 2
4.3.10.4.4 Filter & Frame Local bh 2
4.3.10.4.5 Hanger/Support Unit FCU Local lot 1
4.3.10.4.6 Bracket Suppot Local lot 18

4.3.10.5 Pekerjaan Grille


4.3.10.5.1 1000x75 M'Cond bh 8

4.3.10.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.10.6.1 3/8X1/4 Denji + K-flex m 290
4.3.10.6.2 1/4x1/2 Denji + K-flex m 60
4.3.10.6.3 Fittings Denji + K-flex lot 1

4.3.10.7 Pekerjaan Pipa Drain


4.3.10.7.1 Ø3/4" Intilon m 140
4.3.10.7.2 Fittings Rucika lot 1

4.3.10.8 Pekerjaan Lain2


4.3.10.8.1 Freon Dupont kg 30

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 73
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.10.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.11 AC LANTAI SEPULUH


4.3.11.1 Peralatan Utama
Pengadaan Unit AC

4.3.11.1.1 Model : Split Wall Standart Daikin -R32 set 16


Kap : 1,5 PK (12.000 Btu/Hr)

4.3.11.1.2 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

4.3.11.2 Ongkos Pasang AC


4.3.11.2.1 1/2 Pk set 16
4.3.11.2.2 2 Pk set 2

4.3.11.3 Pengadaan Exhaust fan


4.3.11.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.11.4 Pekerjaan Ducting


4.3.11.4.1 Ducting Bahan Pu First Duct m2 30
4.3.11.4.2 Drain Pan Lokfom bh 2
4.3.11.4.3 Plenum First Duct bh 2
4.3.11.4.4 Filter & Frame Local bh 2
4.3.11.4.5 Hanger/Support Unit FCU Local lot 1
4.3.11.4.6 Bracket Suppot Local lot 18

4.3.11.5 Pekerjaan Grille


4.3.11.5.1 500x500 M'Cond bh
4.3.11.5.2 1000x75 M'Cond bh 8

4.3.11.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.11.6.1 3/8X1/4 Denji + K-flex m 290
4.3.11.6.2 1/4x1/2 Denji + K-flex m 40
4.3.11.6.3 Fittings Denji + K-flex lot 1

4.3.11.7 Pekerjaan Pipa Drain


4.3.11.7.1 Ø3/4" Intilon m 140
4.3.11.7.2 Fittings Rucika lot 1

4.3.11.8 Pekerjaan Lain2


4.3.11.8.1 Freon Dupont kg 30
4.3.11.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.12 AC LANTAI SEBELAS


4.3.12.1 Peralatan Utama
Pengadaan Unit AC

4.3.12.1.1 Model : Split Wall Standart Daikin -R32 set 16


Kap : 1,5 PK (12.000 Btu/Hr)

4.3.12.1.2 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

4.3.12.2 Ongkos Pasang AC


4.3.12.2.1 1 1/2 Pk set 15
4.3.12.2.2 2 Pk set 2

4.3.12.3 Pengadaan Exhaust fan


4.3.12.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.12.4 Pekerjaan Ducting


4.3.12.4.1 Ducting Bahan Pu First Duct m2 30
4.3.12.4.2 Drain Pan Lokfom bh 2
4.3.12.4.3 Plenum First Duct bh 2
4.3.12.4.4 Filter & Frame Local bh 18
4.3.12.4.5 Hanger/Support Unit FCU Local lot 1
4.3.12.4.6 Bracket Suppot Local lot 18

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 74
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.12.5 Pekerjaan Grille


4.3.12.5.1 500x500 M'Cond bh
4.3.12.5.2 1000x75 M'Cond bh 8

4.3.12.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.12.6.1 3/8X1/4 Denji + K-flex m 290
4.3.12.6.2 1/4x1/2 Denji + K-flex m 60
4.3.12.6.3 Fittings Denji + K-flex lot 1

4.3.12.7 Pekerjaan Pipa Drain


4.3.12.7.1 Ø3/4" Intilon m 140
4.3.12.7.2 Fittings Rucika lot 1

4.3.12.8 Pekerjaan Lain2


4.3.12.8.1 Freon Dupont kg 30
4.3.12.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.13 AC LANTAI DUA BELAS


4.3.13.1 Peralatan Utama
Pengadaan Unit AC

4.3.13.1.1 Model : Split Wall Standart Daikin -R32 set 4


Kap : 1,5 PK (12.000 Btu/Hr)

4.3.13.1.2 Model : Split Wall Standart Daikin -R32 set 8


Kap : 2 PK (18.000Btu/hr)

4.3.13.1.3 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

4.3.13.2 Ongkos Pasang AC


4.3.13.2.1 1 1/2 PK set 4
4.3.13.2.2 2 PK set 8
4.3.13.2.3 2 PK set 2

4.3.13.3 Pengadaan Exhaust fan


4.3.13.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.13.4 Pekerjaan Ducting


4.3.13.4.1 Ducting Bahan Pu First Duct m2 30
4.3.13.4.2 Drain Pan Lokfom bh 2
4.3.13.4.3 Plenum First Duct bh 2
4.3.13.4.4 Filter & Frame Local bh 2
4.3.13.4.5 Hanger/Support Unit FCU Local lot 1
4.3.13.4.6 Bracket Suppot Local lot 14

4.3.13.5 Pekerjaan Grille


4.3.13.5.1 1000x75 M'Cond bh 8

4.3.13.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.13.6.1 3/8X1/4 Denji + K-flex m 290
4.3.13.6.2 1/4x1/2 Denji + K-flex m 60
4.3.13.6.3 Fittings Denji + K-flex lot 1

4.3.13.7 Pekerjaan Pipa Drain


4.3.13.7.1 Ø3/4" Intilon m 140
4.3.13.7.2 Fittings Rucika lot 1

4.3.13.8 Pekerjaan Lain2


4.3.13.8.1 Freon Dupont kg 30
4.3.13.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.14 AC LANTAI TIGA BELAS


4.3.14.1 Peralatan Utama
Pengadaan Unit AC

4.3.14.1.1 Model : Split Wall Standart Daikin -R32 set 3


Kap : 1,5 PK (12.000 Btu/Hr)

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 75
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.14.1.2 Model : Split Wall Standart Daikin -R32 set 9


Kap : 2 PK (18.000Btu/hr)

4.3.14.1.3 Model : Split Duct Medium static York - R407C set 2


Kap : 2 PK (18.000Btu/hr)

4.3.14.2 Ongkos Pasang AC


4.3.14.2.1 1 1/2 PK set 3
4.3.14.2.2 2 PK set 9
4.3.14.2.3 2 PK set 2

4.3.14.3 Pengadaan Exhaust fan


4.3.14.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.14.4 Pekerjaan Ducting


4.3.14.4.1 Ducting Bahan Pu First Duct m2 30
4.3.14.4.2 Drain Pan Lokfom bh 2
4.3.14.4.3 Plenum First Duct bh 2
4.3.14.4.4 Filter & Frame Local bh 2
4.3.14.4.5 Hanger/Support Unit FCU Local lot 1
4.3.14.4.6 Bracket Suppot Local lot 2

4.3.14.5 Pekerjaan Grille


4.3.14.5.1 1000x75 M'Cond bh 8

4.3.14.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.14.6.1 3/8X1/4 Denji + K-flex m 290
4.3.14.6.2 1/4x1/2 Denji + K-flex m 60
4.3.14.6.3 Fittings Denji + K-flex lot 1

4.3.14.7 Pekerjaan Pipa Drain


4.3.14.7.1 Ø3/4" Intilon m 140
4.3.14.7.2 Fittings Rucika lot 1

4.3.14.8 Pekerjaan Lain2


4.3.14.8.1 Freon Dupont kg 30
4.3.14.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.15 AC LANTAI EMPAT BELAS


4.3.15.1 Peralatan Utama
Pengadaan Unit AC

4.3.15.1.1 Model : Split Wall Standart Daikin -R32 set 4


Kap : 2 PK (18.000Btu/hr)

4.3.15.1.2 Model : Split Duct Medium static York - R407C set 3


Kap : 2 PK (18.000Btu/hr)

4.3.15.2 Ongkos Pasang AC


4.3.15.2.1 2 Pk set 4
4.3.15.2.2 2 Pk set 3

4.3.15.3 Pengadaan Exhaust fan


4.3.15.3.1 Grille Exhaust : 50CFM M'Cond unit 16

4.3.15.4 Pekerjaan Ducting


4.3.15.4.1 Ducting Bahan Pu First Duct m2 36
4.3.15.4.2 Drain Pan Lokfom bh 3
4.3.15.4.3 Plenum First Duct bh 3
4.3.15.4.4 Filter & Frame Local bh 3
4.3.15.4.5 Hanger/Support Unit FCU Local lot 1
4.3.15.4.6 Bracket Suppot Local lot 3

4.3.15.5 Pekerjaan Grille


4.3.15.5.1 1000x75 M'Cond bh 4
4.3.15.5.2 200x200 M'Cond bh 4
4.3.15.5.3 500x500 M'Cond bh 3

4.3.15.6 Pekerjaan Pipa Refrigerant c/w isolasi pipa, support & fitting
4.3.15.6.1 1/4x1/2 Denji + K-flex m 60
4.3.15.6.2 Fittings Denji + K-flex lot 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 76
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.3.15.7 Pekerjaan Pipa Drain


4.3.15.7.1 Ø3/4" Intilon m 140
4.3.15.7.2 Fittings Rucika lot 1

4.3.15.8 Pekerjaan Lain2


4.3.15.8.1 Freon Dupont kg 15
4.3.15.8.2 Test Press - Flushing Instalasi dgn N2 unit 1

4.3.16 AC LANTAI DAK ATAP

4.3.16.1 Peralatan Utama


4.3.16.1.1 TYPE Unit :
4.3.16.1.2 Exhaust fan
4.3.16.1.3 Cabinet : 4000CFM unit 8

4.3.16.2 Instalasi
4.3.16.2.1 PIPA 4' Intilon m2 230
4.3.16.2.2 PIPA 6' Intilon m2 350
4.3.16.2.3 FITTING Rucika lot 1

4.3.16.3 Pekerjaan Listrik


4.3.16.3.1 Kabel Power Exhaust fan Kabelindo / setara 4 Besar titik 2

4.4 SUB TOTAL PEKERJAAN ELEKTRIKAL

4.4.1 Pengadaan dan pemasangan Fixtures dan Armatures lengkap fittings,

4.4.1.1 LANTAI BASEMENT


4.4.1.1.1 Pekerjaan Instalasi
4.4.1.1.1.1 Instalasi Penerangan Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 51
4.4.1.1.1.2 Instalasi Stop Kontak & Saklar Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 9

4.4.1.1.2 Pengadaan dan pemasangan Fixtures / Armatures


4.4.1.1.2.1 Down Light PLC 18 W bh 91
4.4.1.1.2.2 Lampu TL 1 x 36 W bh 67
4.4.1.1.2.3 Lampu TL 1 x 18 W bh 187
4.4.1.1.2.4 Lampu RM TL 2 x 18 W bh 6
4.4.1.1.2.5 EXIT TL 1 x 10 W + Batere & Charger bh 8
4.4.1.1.2.6 Lampu Barert Ring 20 watt bh 3
4.4.1.1.2.7 Lampu Barert Ring 20 watt + battery Charger bh 3

4.4.1.1.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.1.3.1 Outlet Stop Kontak 13 A, 1 Ph Le Grand bh 49
4.4.1.1.3.2 Skalar tunggal Le Grand bh 24
4.4.1.1.3.3 Skalar seri Le Grand bh 25
4.4.1.1.3.4 Grid switch 6 gang Le Grand bh 2

4.4.1.2 LANTAI 1 / DASAR


4.4.1.2.1 Pekerjaan Instalasi
4.4.1.2.1.1 Instalasi Penerangan Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 0
4.4.1.2.1.2 Instalasi Stop Kontak & Saklar Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 3

4.4.1.2.2 Pengadaan dan pemasangan Fixtures / Armatures


4.4.1.2.2.1 Down Light PLC 18 W bh 105
4.4.1.2.2.2 Lampu TL 1 x 18 W bh 6
4.4.1.2.2.3 Lampu LED Strip 14.4W M 80
4.4.1.2.2.4 Lampu Barert Ring 20 watt bh 2
4.4.1.2.2.5 Lampu Barert Ring 20 watt + battery Charger bh 2

4.4.1.2.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.2.3.1 Outlet Stop Kontak 13 A, 1 Ph Le Grand bh 30
4.4.1.2.3.2 Skalar tunggal Le Grand bh 3
4.4.1.2.3.3 Skalar seri Le Grand bh 8
4.4.1.2.3.4 Grid switch 6 gang Le Grand bh 4

4.4.1.3 LANTAI 2
Area Restoran dan Kitchen
4.4.1.3.1 Pekerjaan Instalasi
4.4.1.3.1.1 Instalasi Penerangan Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 13
4.4.1.3.1.2 Instalasi Stop Kontak & Saklar Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 2

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 77
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.4.1.3.2 Pengadaan dan pemasangan Fixtures/Armatures


4.4.1.3.2.1 Down Light PLC 18 W bh 48
4.4.1.3.2.2 Lampu TL 1 x 36 W bh 8
4.4.1.3.2.3 Lampu TL 1 x 18 W bh 16
4.4.1.3.2.4 Lampu gantung bh 8
4.4.1.3.2.5 Lampu LED Strip M 37
4.4.1.3.2.6 EXIT TL 1 x 10 W + Batere & Charger bh 2
4.4.1.3.2.7 Lampu Barert Ring 20 watt bh 2
4.4.1.3.2.8 Lampu Barert Ring 20 watt + battery Charger bh 2

4.4.1.3.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.3.3.1 Outlet Stop Kontak 13 A, 1 Ph Le Grand bh 22
4.4.1.3.3.2 Skalar tunggal Le Grand bh 2
4.4.1.3.3.3 Skalar seri Le Grand bh 5
4.4.1.3.3.4 Grid switch 6 gang Le Grand bh 2
4.4.1.3.3.5 Kitchen

4.4.1.3.4 Pekerjaan Instalasi daya kitchen


4.4.1.3.4.1 Instalasi Daya Kitchen NYYDalam Conduit Kabelindo Ttk 50

4.4.1.4 LANTAI 3

4.4.1.4.1 Pekerjaan Instalasi


4.4.1.4.1.1 Instalasi Penerangan Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 65
4.4.1.4.1.2 Instalasi Stop Kontak & Saklar Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 5

4.4.1.4.2 Pengadaan dan pemasangan Fixtures/Armatures


4.4.1.4.2.1 Down Light PLC 18 W bh 86
4.4.1.4.2.2 Down Light optik 8 W bh 45
4.4.1.4.2.3 Lampu Spot Light Halogen 50 Watt bh 5
4.4.1.4.2.4 Lampu LED Strip M 506
4.4.1.4.2.5 EXIT TL 1 x 10 W + Batere & Charger bh 2
4.4.1.4.2.6 Lampu Barert Ring 20 watt bh 2
4.4.1.4.2.7 Lampu Barert Ring 20 watt + battery Charger bh 2

4.4.1.4.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.4.3.1 Outlet Stop Kontak 13 A, 1 Ph Le Grand bh 52
4.4.1.4.3.2 Skalar tunggal Le Grand bh 5
4.4.1.4.3.3 Skalar seri Le Grand bh 11

4.4.1.5. LANTAI 4 s/d 11


4.4.1.5.1 Pekerjaan Instalasi
4.4.1.5.1.1 Instalasi Penerangan Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 842
4.4.1.5.1.2 Instalasi Stop Kontak & Saklar Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 792

4.4.1.5.2 Pengadaan dan pemasangan Fixtures/Armatures


4.4.1.5.2.1 Down Light PLC 18 W bh 312
4.4.1.5.2.2 Down Light optik 8 W bh 256
4.4.1.5.2.3 Lampu LED Strip M 506
4.4.1.5.2.4 EXIT TL 1 x 10 W + Batere & Charger bh 16
4.4.1.5.2.5 Lampu Barert Ring 20 watt bh 16
4.4.1.5.2.6 Lampu Barert Ring 20 watt + battery Charger bh 16

4.4.1.5.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.5.3.1 Outlet Stop Kontak 13 A, 1 Ph Le Grand bh 1.056
4.4.1.5.3.2 Skalar tunggal Le Grand bh 136
4.4.1.5.3.3 Skalar seri Le Grand bh 416

4.4.1.6 LANTAI 12
4.4.1.6.1 Pekerjaan Instalasi
4.4.1.6.1.1 Instalasi Penerangan Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 171,00
4.4.1.6.1.2 Instalasi Stop Kontak & Saklar Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 100,00

4.4.1.6.2 Pengadaan dan pemasangan Fixtures/Armatures


4.4.1.6.2.1 Down Light PLC 18 W bh 31
4.4.1.6.2.2 Down Light optik 8 W bh 17
4.4.1.6.2.3 Lampu LED Strip M 117
4.4.1.6.2.4 EXIT TL 1 x 10 W + Batere & Charger bh 2
4.4.1.6.2.5 Lampu Barert Ring 20 watt bh 2
4.4.1.6.2.6 Lampu Barert Ring 20 watt + battery Charger bh 2

4.4.1.6.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.6.3.1.2 Outlet Stop Kontak 13 A, 1 Ph Le Grand bh 100
4.4.1.6.3.1.3 Skalar tunggal Le Grand bh 12
4.4.1.6.3.1.4 Skalar seri Le Grand bh 28

4.4.1.7 LANTAI 13

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 78
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.4.1.7.1 Pekerjaan Instalasi


4.4.1.7.1.1 Instalasi Penerangan Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 172
4.4.1.7.1.2 Instalasi Stop Kontak & Saklar Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 100

4.4.1.7.2 Pengadaan dan pemasangan Fixtures/Armatures


4.4.1.7.2.1 Down Light PLC 18 W bh 32
4.4.1.7.2.2 Down Light optik 8 W bh 17
4.4.1.7.2.3 Lampu LED Strip M 117
4.4.1.7.2.4 EXIT TL 1 x 10 W + Batere & Charger bh 2
4.4.1.7.2.5 Lampu Barert Ring 20 watt bh 2
4.4.1.7.2.6 Lampu Barert Ring 20 watt + battery Charger bh 2

4.4.1.7.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.7.3.1 Outlet Stop Kontak 13 A, 1 Ph Le Grand bh 100
4.4.1.7.3.2 Skalar tunggal Le Grand bh 12
4.4.1.7.3.3 Skalar seri Le Grand bh 28

4.4.1.8 LANTAI 14
4.4.1.8.1 Pekerjaan Instalasi
4.4.1.8.1.1 Instalasi Penerangan Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 125
4.4.1.8.1.2 Instalasi Stop Kontak & Saklar Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 46

4.4.1.8.2 Pengadaan dan pemasangan Fixtures/Armatures


4.4.1.8.2.1 Down Light PLC 18 W bh 55
4.4.1.8.2.2 Down Light optik 8 W bh 12
4.4.1.8.2.3 Lampu LED Strip M 83
4.4.1.8.2.4 Open type TL 1 x 18 W V Shape bh 20
4.4.1.8.2.5 EXIT TL 1 x 10 W + Batere & Charger bh 2
4.4.1.8.2.6 Lampu Barert Ring 20 watt bh 2
4.4.1.8.2.7 Lampu Barert Ring 20 watt + battery Charger bh 2

4.4.1.8.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.8.3.1 Outlet Stop Kontak 13 A, 1 Ph Le Grand bh 42
4.4.1.8.3.2 Outlet Stop Kontak Lantai 13 A, 1 Ph Le Grand bh 4
4.4.1.8.3.3 Skalar tunggal Le Grand bh 6
4.4.1.8.3.4 Skalar seri Le Grand bh 18

4.4.1.9 LANTAI ATAP


4.4.1.9.1 Pekerjaan Instalasi
4.4.1.9.1.1 Instalasi Penerangan Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 10
4.4.1.9.1.2 Instalasi Stop Kontak & Saklar Kabel NYA Dalam Conduit Kabelindo / setara 4 Besar Ttk 8

4.4.1.9.2 Pengadaan dan pemasangan Fixtures/Armatures


4.4.1.9.2.1 Down Light PLC 13 W bh 10
4.4.1.9.2.2 EXIT TL 1 x 10 W + Batere & Charger bh 2

4.4.1.9.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.9.3.1 Outlet Stop Kontak 13 A, 1 Ph Le Grand bh 18
4.4.1.9.3.2 Outlet Stop Kontak Lantai 13 A, 1 Ph Le Grand bh 4
4.4.1.9.3.3 Skalar seri Le Grand bh 2

4.4.1.10 PENERANGAN LUAR BANGUNAN


4.4.1.10.1 Pekerjaan Instalasi
4.4.1.10.1.1 Instalasi Penerangan Kabel NYFGBY 3x2.5mm Kabelindo / setara 4 Besar Ttk 13

4.4.1.10.2 Pengadaan dan pemasangan Fixtures/Armatures


4.4.1.10.2.1 Lampu Jalan Plar tiang 3m 2x50 watt bh 10
4.4.1.10.2.2 Lampu Jalan Plar tiang 3m 1x50 watt bh 4
4.4.1.10.2.3 Lampu Dinding Luar 18 watt bh 85
4.4.1.10.2.4 Lampu Dinding Ramp 18 watt bh 20
4.4.1.10.2.5 Lampu Taman 23 Watt bh 12

4.4.1.10.3 Pengadaan dan Pemasangan Outlet Stop Kontak dan Saklar


4.4.1.10.3.1 Outlet Stop Kontak 13 A, 1 Ph bh
4.4.1.10.3.2 Skalar seri bh

4.4.2 PEKERJAAN TRANSFORMATOR Schneider Unit 1


4.4.2.1 Pekerjaan Pemasangan Transformator 20 kV-400/231 Volt, 1000kVA
dry type, termasuk peralatan penunjang penyiapan dudukan trafo
Pagar & Pintu BRC,Terminasi, Grounding dan Accessories

4.4.3 PEKERJAAN PANEL TEGANGAN MENENGAH 20 KV


4.4.3.1 Pekerjaan termasuk pengadaan dan pemasangan material panel,

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 79
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

lengkap dengan komponen, metering, terminasi, grounding dan


accessories.
Panel Hubung Bagi Tegangan Menengah, PHBTM 20 KV terdiri atas :
4.4.3.1.1 1.1. Incoming Cubicle Schneider Unit 1
4.4.3.1.2 1.2. Out Going Cubicle Schneider Unit 1
4.4.3.1.3 1.3. Kabel N2XSY 3 x 1 x 95 mm2 Kabelindo / setara 4 Besar M 14

4.4.4 PEKERJAAN PANEL TEGANGAN RENDAH

4.4.4.1 Lantai Basement


4.4.4.1.1 SDP BASEMENT Panel Elektrik Unit 1
4.4.4.1.2 PP-FAN-B1 Panel Elektrik Unit 1
4.4.4.1.3 PP-ELEKTRONIK Panel Elektrik Unit 1
4.4.4.1.4 PP-PLUMBING Panel Elektrik Unit 1
4.4.4.1.5 PP-STP Panel Elektrik Unit 1
4.4.4.1.6 PP-SUMPIT Panel Elektrik Unit 1
4.4.4.1.7 IP.EG Panel Elektrik Unit 1
4.4.4.1.8 IP.PP Panel Elektrik Unit 1
4.4.4.1.9 IP.BA Panel Elektrik Unit 1
4.4.4.1.10 IP.BB Panel Elektrik Unit 1
4.4.4.1.11 IP.MS2 Panel Elektrik Unit 1
4.4.4.1.12 IP.LB Panel Elektrik Unit 1
4.4.4.1.13 IP.LW Panel Elektrik Unit 1
4.4.4.1.14 IP.LP Panel Elektrik Unit 1
4.4.4.1.15 IP.AC Panel Elektrik Unit 1
4.4.4.1.16 IP.ED Panel Elektrik Unit 1
4.4.4.1.17 IP.HRD Panel Elektrik Unit 1
4.4.4.1.18 IP.MS1 Panel Elektrik Unit 1

4.4.4.2 LANTAI 1
Tower 1
4.4.4.2.1 LVMDP Panel Elektrik Unit 1
4.4.4.2.2 CAPASITOR BANK Panel Elektrik Unit 1
4.4.4.2.3 PP-VAC&FAN L1/1 Panel Elektrik Unit 1
4.4.4.2.4 PP-COFFEE SHOP Panel Elektrik Unit 1
4.4.4.2.5 PP-L1/1 Panel Elektrik Unit 1
4.4.4.2.6 SDP1-1 Panel Elektrik Unit 1
4.4.4.2.7 PP-OL Panel Elektrik Unit 1

4.4.4.3 LANTAI 2
Tower 1
4.4.4.3.1 SDP1-2 Panel Elektrik Unit 1
4.4.4.3.2 PP-KITCHEN L2/1 Panel Elektrik Unit 1
4.4.4.3.3 PP-VAC&FAN L1/1 Panel Elektrik Unit 1
4.4.4.3.4 PP-L2/1 Panel Elektrik Unit 1
4.4.4.4 LANTAI 3
Tower 1
4.4.4.4.1 SDP1-3 Panel Elektrik Unit 1
4.4.4.4.2 PP MEETING R.L3/1 Panel Elektrik Unit 6
4.4.4.4.3 PP-L3/1 Panel Elektrik Unit 1
4.4.4.4.4 PP-BUSSINES R.L3/1 Panel Elektrik Unit 1

4.4.4.5 LANTAI 4
Tower 1
4.4.4.5.1 SDP1-4 Panel Elektrik Unit 1
4.4.4.5.2 LP-DELUXE Panel Elektrik Unit 11
4.4.4.5.3 LP-TWIN Panel Elektrik Unit 5

4.4.4.6 LANTAI 5
4.4.4.6.1 SDP1-5 Panel Elektrik Unit 1
4.4.4.6.2 LP-DELUXE Panel Elektrik Unit 11
4.4.4.6.3 LP-TWIN Panel Elektrik Unit 5

4.4.4.7 LANTAI 6
4.4.4.7.1 SDP1-6 Panel Elektrik Unit 1
4.4.4.7.2 LP-DELUXE Panel Elektrik Unit 11
4.4.4.7.3 LP-TWIN Panel Elektrik Unit 5

4.4.4.8 LANTAI 7
4.4.4.8.1 SDP1-7 Panel Elektrik Unit 1
4.4.4.8.2 LP-DELUXE Panel Elektrik Unit 11
4.4.4.8.3 LP-TWIN Panel Elektrik Unit 4

4.4.4.9 LANTAI 8

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 80
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.4.4.9.1 SDP1-8 Panel Elektrik Unit 1


4.4.4.9.2 LP-DELUXE Panel Elektrik Unit 11
4.4.4.9.3 LP-TWIN Panel Elektrik Unit 5

4.4.4.10 LANTAI 9
4.4.4.10.1 SDP1-9 Panel Elektrik Unit 1
4.4.4.10.2 LP-DELUXE Panel Elektrik Unit 11
4.4.4.10.3 LP-TWIN Panel Elektrik Unit 5

4.4.4.11 LANTAI 10
4.4.4.11.1 SDP1-10 Panel Elektrik Unit 1
4.4.4.11.2 LP-DELUXE Panel Elektrik Unit 11
4.4.4.11.3 LP-TWIN Panel Elektrik Unit 5

4.4.4.12 LANTAI 11
4.4.4.12.1 SDP1-11 Panel Elektrik Unit 1
4.4.4.12.2 LP-DELUXE Panel Elektrik Unit 11
4.4.4.12.3 LP-TWIN Panel Elektrik Unit 5

4.4.4.13 LANTAI 12
4.4.4.13.1 SDP1-12 Panel Elektrik Unit 1
4.4.4.13.2 LP-DELUXE Panel Elektrik Unit 8
4.4.4.13.3 LP-TWIN Panel Elektrik Unit 4

4.4.4.14 LANTAI 13
4.4.4.14.1 SDP1-13 Panel Elektrik Unit 1
4.4.4.14.2 LP-DELUXE Panel Elektrik Unit 9
4.4.4.14.3 LP-TWIN Panel Elektrik Unit 3

4.4.4.15 LANTAI 14
4.4.4.15.1 SDP1-14 Panel Elektrik Unit 1
4.4.4.15.2 PP-L14 Panel Elektrik Unit 1
4.4.4.15.3 LP-DINING Panel Elektrik Unit 1
4.4.4.15.4 PP-R.TIDUR Panel Elektrik Unit 3
4.4.4.15.5 LP-BATH ROOM Panel Elektrik Unit 1
4.4.4.15.6 PP-POOL.14 Panel Elektrik Unit 1
4.4.4.15.7 PP-KITCHEN.14 Panel Elektrik Unit 1

4.4.4.16 LANTAI ATAP


4.4.4.16.1 SDP1-ATAP Panel Elektrik Unit 1
4.4.4.16.2 PP-LIFT/S Panel Elektrik Unit 1
4.4.4.16.3 PP-PF/1 Panel Elektrik Unit 1
4.4.4.16.4 PP-PF-2 Panel Elektrik Unit 1
4.4.4.16.5 PP-AC-ATAP Panel Elektrik Unit 1
4.4.4.16.6 PP-GONDOLA Panel Elektrik Unit 1
4.4.4.16.7 PP-LIFT/P Panel Elektrik Unit 1
4.4.4.16.8 LP-ATAP Panel Elektrik Unit 1

4.4.5 PEKERJAAN PENGADAAN DAN PEMASANGAN KABEL DISTRIBUSI

4.4.5.1 Kabel Tegangan Rendah


4.4.5.1.1 Dari Panel Sinkron genset- 1 ke LVMDP
4.4.5.1.1.1 Kabel NYY 8x1 x 240 mm2 Kabelindo / setara 4 Besar M 14
4.4.5.1.2 Dari Panel Trafo 1 ke LVMDP
4.4.5.1.2.1 Kabel NYY 8x1 x 240 mm2 Kabelindo / setara 4 Besar M 14
4.4.5.1.3 Dari LVMDP ke PP-OL
4.4.5.1.3.1 Kabel NYFGbY 4 x 6 mm2 Kabelindo / setara 4 Besar M 59
4.4.5.1.3.2 Kabel BC 6 mm2 Kabelindo / setara 4 Besar M 59
4.4.5.1.4 Dari LVMDP ke PP-P
4.4.5.1.4.1 Kabel NYY 4x6mm Kabelindo / setara 4 Besar M 101
4.4.5.1.4.2 Kabel BC 6 mm2 Kabelindo / setara 4 Besar M 101
4.4.5.1.5 Dari LVMDP ke PP-H
4.4.5.1.5.1 Kabel NYY 4x35mm Kabelindo / setara 4 Besar M 101
4.4.5.1.5.2 Kabel BC 35 mm2 Kabelindo / setara 4 Besar M 101
4.4.5.1.6 Dari LVMDP ke PP-STP
4.4.5.1.6.1 Kabel NYY 4x10mm Kabelindo / setara 4 Besar M 63
4.4.5.1.6.2 Kabel BC 6 mm2 Kabelindo / setara 4 Besar M 63
4.4.5.1.7 Dari LVMDP ke SDP Emergency
4.4.5.1.7.1 Kabel NYY 4x35mm Kabelindo / setara 4 Besar M 108
4.4.5.1.7.2 Kabel BC 35 mm2 Kabelindo / setara 4 Besar M 108
4.4.5.1.8 Dari LVMDP ke SDP Basement
4.4.5.1.8.1 Kabel NYY 4x50mm Kabelindo / setara 4 Besar M 11
4.4.5.1.8.2 Kabel BC 25 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.9 Dari LVMDP ke SDP Satu
4.4.5.1.9.1 Kabel NYY 4x50mm Kabelindo / setara 4 Besar M 112
4.4.5.1.9.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 112
4.4.5.1.10 Dari LVMDP ke SDP Dua

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 81
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.4.5.1.10.1 Kabel NYY 4x35mm Kabelindo / setara 4 Besar M 115


4.4.5.1.10.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 115
4.4.5.1.11 Dari LVMDP ke SDP tiga
4.4.5.1.11.1 Kabel NYY 4x16 mm Kabelindo / setara 4 Besar M 118
4.4.5.1.11.2 Kabel BC 6 mm2 Kabelindo / setara 4 Besar M 118
4.4.5.1.12 Dari LVMDP ke SDP Empat
4.4.5.1.12.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 121
4.4.5.1.12.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 121
4.4.5.1.13 Dari LVMDP ke SDP Lima
4.4.5.1.13.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 124
4.4.5.1.13.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 124
4.4.5.1.14 Dari LVMDP ke SDP Enam
4.4.5.1.14.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 127
4.4.5.1.14.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 127
4.4.5.1.15 Dari LVMDP ke SDP Tujuh
4.4.5.1.15.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 130
4.4.5.1.15.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 130
4.4.5.1.16 Dari LVMDP keSDP Delapan
4.4.5.1.16.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 133
4.4.5.1.16.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 133
4.4.5.1.17 Dari LVMDP keSDP Semibilan
4.4.5.1.17.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 136
4.4.5.1.17.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 136
4.4.5.1.18 Dari LVMDP keSDP Sepuluh
4.4.5.1.18.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 139
4.4.5.1.18.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 139
4.4.5.1.19 Dari LVMDP keSDP Sebelas
4.4.5.1.19.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 142
4.4.5.1.19.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 142
4.4.5.1.20 Dari LVMDP keSDP Dua Belas
4.4.5.1.20.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 145
4.4.5.1.20.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 145
4.4.5.1.21 Dari LVMDP keSDP Tiga Belas
4.4.5.1.21.1 Kabel NYY 4x16mm Kabelindo / setara 4 Besar M 148
4.4.5.1.21.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 148
4.4.5.1.22 Dari LVMDP keSDP Empat Belas
4.4.5.1.22.1 Kabel NYY 4x16mm Kabelindo / setara 4 Besar M 151
4.4.5.1.22.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 151
4.4.5.1.23 Dari SDP EMERGENCY ke SDP ATAP
4.4.5.1.23.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 154
4.4.5.1.23.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 154
4.4.5.1.24 Dari SDP EMERGENCY keLP BASEMENT T1
4.4.5.1.24.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 11
4.4.5.1.25 Dari SDP EMERGENCY ke LP 1
4.4.5.1.25.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 14
4.4.5.1.26 Dari SDP EMERGENCY ke LP 2
4.4.5.1.26.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 18
4.4.5.1.27 Dari SDP EMERGENCY ke LP 3
4.4.5.1.27.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 21
4.4.5.1.28 Dari SDP EMERGENCY ke LP 4
4.4.5.1.28.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 25
4.4.5.1.29 Dari SDP EMERGENCY ke LP 5
4.4.5.1.29.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 28
4.4.5.1.30 Dari SDP EMERGENCY ke LP 6
4.4.5.1.30.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 31
4.4.5.1.31 Dari SDP EMERGENCY ke LP 7
4.4.5.1.31.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 34
4.4.5.1.32 Dari SDP EMERGENCY ke LP 8
4.4.5.1.32.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 36
4.4.5.1.33 Dari SDP EMERGENCY ke LP 9
4.4.5.1.33.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 39
4.4.5.1.34 Dari SDP EMERGENCY ke LP 10 0
4.4.5.1.34.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 42
4.4.5.1.35 Dari SDP EMERGENCY ke LP 11
4.4.5.1.35.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 45
4.4.5.1.36 Dari SDP EMERGENCY ke LP 12
4.4.5.1.36.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 48
4.4.5.1.37 Dari SDP EMERGENCY ke LP 13
4.4.5.1.37.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 51
4.4.5.1.38 Dari SDP EMERGENCY ke LP 14
4.4.5.1.38.1 Kabel NYY 3x2.5mm Kabelindo / setara 4 Besar M 54
4.4.5.1.39 Dari PP-H ke hydrant Jockey
4.4.5.1.39.1 Kabel NYY 4x4mm Kabelindo / setara 4 Besar M 9
4.4.5.1.40 Dari PP-H ke hydrant Hydrant Elecrtik
4.4.5.1.40.1 Kabel NYY 2x3x10mm Kabelindo / setara 4 Besar M 9
4.4.5.1.41 Dari PP- Pompa ke Pompa Transfer 1
4.4.5.1.41.1 Kabel NYY 4x4mm Kabelindo / setara 4 Besar M 9
4.4.5.1.42 Dari PP- Pompa ke Pompa Transfer 2
4.4.5.1.42.1 Kabel NYY 4x4mm Kabelindo / setara 4 Besar M 9

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 82
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.4.5.1.43 Dari PP- Pompa ke Pompa Sand Filter 1


4.4.5.1.43.1 Kabel NYY 4x4mm Kabelindo / setara 4 Besar M 9
4.4.5.1.44 Dari PP- Pompa ke Pompa Sand Filter 2
4.4.5.1.44.1 Kabel NYY 4x4mm Kabelindo / setara 4 Besar M 9
4.4.5.1.45 Dari PP- SDP Basement Ke PP Basement
4.4.5.1.45.1 Kabel NYY 4x35mm Kabelindo / setara 4 Besar M 11
4.4.5.1.45.2 Kabel BC 16 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.46 Dari PP- SDP Basement Ke PP VAC
4.4.5.1.46.1 Kabel NYY 4x16mm Kabelindo / setara 4 Besar M 11
4.4.5.1.46.2 Kabel BC 10 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.47 Dari PP Basement ke panel IP
4.4.5.1.47.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 517
4.4.5.1.48 Dari PP- SDP Satu Ke PP L1
4.4.5.1.48.1 Kabel NYY 4x6mm Kabelindo / setara 4 Besar M 11
4.4.5.1.49 Dari PP- SDP Satu Ke PP VAC
4.4.5.1.49.1 Kabel NYY 4x25mm Kabelindo / setara 4 Besar M 11
4.4.5.1.49.2 Kabel BC 10 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.50 Dari PP- SDP Satu Ke PP coffe shop
4.4.5.1.50.1 Kabel NYY 4x6mm Kabelindo / setara 4 Besar M 41
4.4.5.1.50.2 Kabel BC 10 mm2 Kabelindo / setara 4 Besar M 41
4.4.5.1.51 Dari PP- SDP Dua Ke PP L2
4.4.5.1.51.1 Kabel NYY 4x4mm Kabelindo / setara 4 Besar M 11
4.4.5.1.51.2 Kabel BC 4 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.52 Dari PP- SDP Dua Ke PP VAC
4.4.5.1.52.1 Kabel NYY 4x16mm Kabelindo / setara 4 Besar M 11
4.4.5.1.52.2 Kabel BC 10 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.53 Dari PP- SDP Dua Ke PP Kitchen
4.4.5.1.53.1 Kabel NYY 4x6mm Kabelindo / setara 4 Besar M 11
4.4.5.1.53.2 Kabel BC 6 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.54 Dari PP- SDP Dua Ke PP Restoran
4.4.5.1.54.1 Kabel NYY 4x6mm Kabelindo / setara 4 Besar M 11
4.4.5.1.54.2 Kabel BC 6 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.55 Dari PP- SDP Tiga Ke PP L3
4.4.5.1.55.1 Kabel NYY 4x6mm Kabelindo / setara 4 Besar M 11
4.4.5.1.55.2 Kabel BC 6 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.56 Dari PP- SDP Tiga Ke PP VAC L3
4.4.5.1.56.1 Kabel NYY 4x10mm Kabelindo / setara 4 Besar M 11
4.4.5.1.56.2 Kabel BC 6 mm2 Kabelindo / setara 4 Besar M 11
4.4.5.1.57 Dari PP- PP L3 Ke PP Meeting
4.4.5.1.57.1 Kabel NY 3x2.5mm Kabelindo / setara 4 Besar M 158
4.4.5.1.58 Dari PP- SDP empat Ke LP 1
4.4.5.1.58.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.59 Dari PP- SDP empat Ke LP 2
4.4.5.1.59.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.60 Dari PP- SDP empat Ke LP 3
4.4.5.1.60.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.61 Dari PP- SDP empat Ke LP 4
4.4.5.1.61.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.62 Dari PP- SDP empat Ke LP 5
4.4.5.1.62.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.63 Dari PP- SDP empat Ke LP 6
4.4.5.1.63.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.64 Dari PP- SDP empat Ke LP 7
4.4.5.1.64.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.65 Dari PP- SDP empat Ke LP 8
4.4.5.1.65.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.66 Dari PP- SDP empat Ke LP 9
4.4.5.1.66.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.67 Dari PP- SDP empat Ke LP 10
4.4.5.1.67.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.68 Dari PP- SDP empat Ke LP 11
4.4.5.1.68.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.69 Dari PP- SDP empat Ke LP 12
4.4.5.1.69.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.70 Dari PP- SDP empat Ke LP 13
4.4.5.1.70.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.71 Dari PP- SDP empat Ke LP 14
4.4.5.1.71.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.72 Dari PP- SDP empat Ke LP 15
4.4.5.1.72.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.73 Dari PP- SDP empat Ke LP 16
4.4.5.1.73.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.74 Dari PP- SDP Lima Ke LP 1
4.4.5.1.74.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.75 Dari PP- SDP Lima Ke LP 2
4.4.5.1.75.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.76 Dari PP- SDP Lima Ke LP 3
4.4.5.1.76.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.77 Dari PP- SDP Lima Ke LP 4

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 83
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.4.5.1.77.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14


4.4.5.1.78 Dari PP- SDP Lima Ke LP 5
4.4.5.1.78.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.79 Dari PP- SDP Lima Ke LP 6
4.4.5.1.79.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.80 Dari PP- SDP Lima Ke LP 7
4.4.5.1.80.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.81 Dari PP- SDP Lima Ke LP 8
4.4.5.1.81.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.82 Dari PP- SDP Lima Ke LP 9
4.4.5.1.82.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.83 Dari PP- SDP Lima Ke LP 10
4.4.5.1.83.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.84 Dari PP- SDP Lima Ke LP 11
4.4.5.1.84.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.85 Dari PP- SDP Lima Ke LP 12
4.4.5.1.85.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.86 Dari PP- SDP Lima Ke LP 13
4.4.5.1.86.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.87 Dari PP- SDP Lima Ke LP 14
4.4.5.1.87.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.88 Dari PP- SDP Lima Ke LP 15
4.4.5.1.88.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.89 Dari PP- SDP Lima Ke LP 16
4.4.5.1.89.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.90 Dari PP- SDP Enam Ke LP 1
4.4.5.1.90.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.91 Dari PP- SDP Enam Ke LP 2
4.4.5.1.91.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.92 Dari PP- SDP Enam Ke LP 3
4.4.5.1.92.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.93 Dari PP- SDP Enam Ke LP 4
4.4.5.1.93.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.94 Dari PP- SDP Enam Ke LP 5
4.4.5.1.94.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.95 Dari PP- SDP Enam Ke LP 6
4.4.5.1.95.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.96 Dari PP- SDP Enam Ke LP 7
4.4.5.1.96.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.97 Dari PP- SDP Enam Ke LP 8
4.4.5.1.97.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.98 Dari PP- SDP Enam Ke LP 9
4.4.5.1.98.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.99 Dari PP- SDP Enam Ke LP 10
4.4.5.1.99.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.100 Dari PP- SDP Enam Ke LP 11
4.4.5.1.100.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.101 Dari PP- SDP Enam Ke LP 12
4.4.5.1.101.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.102 Dari PP- SDP Enam Ke LP 13
4.4.5.1.102.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.103 Dari PP- SDP Enam Ke LP 14
4.4.5.1.103.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.104 Dari PP- SDP Enam Ke LP 15
4.4.5.1.104.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.105 Dari PP- SDP Enam Ke LP 16
4.4.5.1.105.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.106 Dari PP- SDPTujuh Ke LP 1
4.4.5.1.106.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.107 Dari PP- SDPTujuh Ke LP 2
4.4.5.1.107.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.108 Dari PP- SDPTujuh Ke LP 3
4.4.5.1.108.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.109 Dari PP- SDPTujuh Ke LP 4
4.4.5.1.109.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.110 Dari PP- SDPTujuh Ke LP 5
4.4.5.1.110.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.111 Dari PP- SDPTujuh Ke LP 6
4.4.5.1.111.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.112 Dari PP- SDPTujuh Ke LP 7
4.4.5.1.112.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.113 Dari PP- SDPTujuh Ke LP 8
4.4.5.1.113.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.114 Dari PP- SDPTujuh Ke LP 9
4.4.5.1.114.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.115 Dari PP- SDPTujuh Ke LP 10
4.4.5.1.115.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.116 Dari PP- SDPTujuh Ke LP 11
4.4.5.1.116.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 84
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.4.5.1.117 Dari PP- SDPTujuh Ke LP 12


4.4.5.1.117.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.118 Dari PP- SDPTujuh Ke LP 13
4.4.5.1.118.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.119 Dari PP- SDPTujuh Ke LP 14
4.4.5.1.119.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.120 Dari PP- SDPTujuh Ke LP 15
4.4.5.1.120.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.121 Dari PP- SDPTujuh Ke LP 16
4.4.5.1.121.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.122 Dari PP- SDP Delapan Ke LP 1
4.4.5.1.122.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.123 Dari PP- SDP Delapan Ke LP 2
4.4.5.1.123.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.124 Dari PP- SDP Delapan Ke LP 3
4.4.5.1.124.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.125 Dari PP- SDP Delapan Ke LP 4
4.4.5.1.125.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.126 Dari PP- SDP Delapan Ke LP 5
4.4.5.1.126.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.127 Dari PP- SDP Delapan Ke LP 6
4.4.5.1.127.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.128 Dari PP- SDP Delapan Ke LP 7
4.4.5.1.128.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.129 Dari PP- SDP Delapan Ke LP 8
4.4.5.1.129.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.130 Dari PP- SDP Delapan Ke LP 9
4.4.5.1.130.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.131 Dari PP- SDP Delapan Ke LP 10
4.4.5.1.131.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.132 Dari PP- SDP Delapan Ke LP 11
4.4.5.1.132.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.133 Dari PP- SDP Delapan Ke LP 12
4.4.5.1.133.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.134 Dari PP- SDP Delapan Ke LP 13
4.4.5.1.134.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.135 Dari PP- SDP Delapan Ke LP 14
4.4.5.1.135.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.136 Dari PP- SDP Delapan Ke LP 15
4.4.5.1.136.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.137 Dari PP- SDP Delapan Ke LP 16
4.4.5.1.137.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.138 Dari PP- SDP Sembilan Ke LP 1
4.4.5.1.138.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.139 Dari PP- SDP Sembilan Ke LP 2
4.4.5.1.139.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.140 Dari PP- SDP Sembilan Ke LP 3
4.4.5.1.140.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.141 Dari PP- SDP Sembilan Ke LP 4
4.4.5.1.141.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.142 Dari PP- SDP Sembilan Ke LP 5
4.4.5.1.142.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.143 Dari PP- SDP Sembilan Ke LP 6
4.4.5.1.143.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.144 Dari PP- SDP Sembilan Ke LP 7
4.4.5.1.144.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.145 Dari PP- SDP Sembilan Ke LP 8
4.4.5.1.145.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.146 Dari PP- SDP Sembilan Ke LP 9
4.4.5.1.146.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.147 Dari PP- SDP Sembilan Ke LP 10
4.4.5.1.147.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.148 Dari PP- SDP Sembilan Ke LP 11
4.4.5.1.148.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.149 Dari PP- SDP Sembilan Ke LP 12
4.4.5.1.149.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.150 Dari PP- SDP Sembilan Ke LP 13 0
4.4.5.1.150.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.151 Dari PP- SDP Sembilan Ke LP 14
4.4.5.1.151.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.152 Dari PP- SDP Sembilan Ke LP 15
4.4.5.1.152.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.153 Dari PP- SDP Sembilan Ke LP 16
4.4.5.1.153.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.154 Dari PP- SDP Sepuluh Ke LP 1
4.4.5.1.154.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.155 Dari PP- SDP Sepuluh Ke LP 2
4.4.5.1.155.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.156 Dari PP- SDP Sepuluh Ke LP 3

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 85
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.4.5.1.156.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14


4.4.5.1.157 Dari PP- SDP Sepuluh Ke LP 4
4.4.5.1.157.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.158 Dari PP- SDP Sepuluh Ke LP 5
4.4.5.1.158.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.159 Dari PP- SDP Sepuluh Ke LP 6
4.4.5.1.159.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.160 Dari PP- SDP Sepuluh Ke LP 7
4.4.5.1.160.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.161 Dari PP- SDP Sepuluh Ke LP 8
4.4.5.1.161.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.162 Dari PP- SDP Sepuluh Ke LP 9
4.4.5.1.162.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.163 Dari PP- SDP Sepuluh Ke LP 10
4.4.5.1.163.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.164 Dari PP- SDP Sepuluh Ke LP 11
4.4.5.1.164.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.165 Dari PP- SDP Sepuluh Ke LP 12
4.4.5.1.165.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.166 Dari PP- SDP Sepuluh Ke LP 13
4.4.5.1.166.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.167 Dari PP- SDP Sepuluh Ke LP 14 0
4.4.5.1.167.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.168 Dari PP- SDP Sepuluh Ke LP 15
4.4.5.1.168.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.169 Dari PP- SDP Sepuluh Ke LP 16
4.4.5.1.169.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.170 Dari PP- SDP SeBelas Ke LP 1
4.4.5.1.170.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.171 Dari PP- SDP SeBelas Ke LP 2
4.4.5.1.171.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.172 Dari PP- SDP SeBelas Ke LP 3
4.4.5.1.172.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.173 Dari PP- SDP SeBelas Ke LP 4
4.4.5.1.173.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.174 Dari PP- SDP SeBelas Ke LP 5
4.4.5.1.174.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.175 Dari PP- SDP SeBelas Ke LP 6
4.4.5.1.175.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.176 Dari PP- SDP SeBelas Ke LP 7
4.4.5.1.176.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.177 Dari PP- SDP SeBelas Ke LP 8
4.4.5.1.177.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.178 Dari PP- SDP SeBelas Ke LP 9
4.4.5.1.178.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.179 Dari PP- SDP SeBelas Ke LP 10
4.4.5.1.179.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.180 Dari PP- SDP SeBelas Ke LP 11
4.4.5.1.180.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.181 Dari PP- SDP SeBelas Ke LP 12
4.4.5.1.181.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.182 Dari PP- SDP SeBelas Ke LP 13
4.4.5.1.182.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.183 Dari PP- SDP SeBelas Ke LP 14
4.4.5.1.183.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.184 Dari PP- SDP SeBelas Ke LP 15
4.4.5.1.184.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.185 Dari PP- SDP SeBelas Ke LP 16
4.4.5.1.185.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.186 Dari PP- SDP Dua Belas Ke LP 1
4.4.5.1.186.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.187 Dari PP- SDP Dua Belas Ke LP 2
4.4.5.1.187.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.188 Dari PP- SDP Dua Belas Ke LP 3
4.4.5.1.188.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.189 Dari PP- SDP Dua Belas Ke LP 4
4.4.5.1.189.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.190 Dari PP- SDP Dua Belas Ke LP 5
4.4.5.1.190.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.191 Dari PP- SDP Dua Belas Ke LP 6
4.4.5.1.191.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.192 Dari PP- SDP Dua Belas Ke LP 7
4.4.5.1.192.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.193 Dari PP- SDP Dua Belas Ke LP 8
4.4.5.1.193.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.194 Dari PP- SDP Dua Belas Ke LP 9
4.4.5.1.194.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.195 Dari PP- SDP Dua Belas Ke LP 10
4.4.5.1.195.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 86
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.4.5.1.196 Dari PP- SDP Dua Belas Ke LP 11


4.4.5.1.196.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.197 Dari PP- SDP Dua Belas Ke LP 12
4.4.5.1.197.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.198 Dari PP- SDP Dua Belas Ke LP 13
4.4.5.1.198.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.199 Dari PP- SDP Dua Belas Ke LP 14
4.4.5.1.199.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 35
4.4.5.1.200 Dari PP- SDP Tiga Belas Ke LP 1
4.4.5.1.200.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.201 Dari PP- SDP Tiga Belas Ke LP 2
4.4.5.1.201.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.202 Dari PP- SDP Tiga Belas Ke LP 3
4.4.5.1.202.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.203 Dari PP- SDP Tiga Belas Ke LP 4
4.4.5.1.203.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.204 Dari PP- SDP Tiga Belas Ke LP 5
4.4.5.1.204.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.205 Dari PP- SDP Tiga Belas Ke LP 6
4.4.5.1.205.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.206 Dari PP- SDP Tiga Belas Ke LP 7
4.4.5.1.206.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.207 Dari PP- SDP Tiga Belas Ke LP 8
4.4.5.1.207.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.208 Dari PP- SDP Tiga Belas Ke LP 9
4.4.5.1.208.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.209 Dari PP- SDP Tiga Belas Ke LP 10
4.4.5.1.209.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.210 Dari PP- SDP Tiga Belas Ke LP 11
4.4.5.1.210.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.211 Dari PP- SDP Tiga Belas Ke LP 12
4.4.5.1.211.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.212 Dari PP- SDP Empat Belas Ke LP 1
4.4.5.1.212.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.213 Dari PP- SDP Empat Belas Ke LP 2
4.4.5.1.213.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.214 Dari PP- SDP Empat Belas Ke LP 3
4.4.5.1.214.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.215 Dari PP- SDP Empat Belas Ke LP 4
4.4.5.1.215.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 14
4.4.5.1.216 Dari PP- SDP Empat Belas Ke LP 5
4.4.5.1.216.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.217 Dari PP- SDP Empat Belas Ke LP 6
4.4.5.1.217.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.218 Dari PP- SDP Empat Belas Ke LP 7
4.4.5.1.218.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.219 Dari PP- SDP Empat Belas Ke LP 8
4.4.5.1.219.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 21
4.4.5.1.220 Dari PP- SDP Empat Belas Ke LP 9
4.4.5.1.220.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.221 Dari PP- SDP Empat Belas Ke LP 10
4.4.5.1.221.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.222 Dari PP- SDP Empat Belas Ke LP 11
4.4.5.1.222.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28
4.4.5.1.223 Dari PP- SDP Empat Belas Ke LP 12
4.4.5.1.223.1 Kabel NYM 3x4mm Kabelindo / setara 4 Besar M 28

4.4.6 PEKERJAAN INSTALASI PENANGKAL PETIR

4.4.6.1 Air terminal merk Thomas rad 150 mtr Luxor Ls 1


4.4.6.2 Tiang penangkal petir lengkap dengan supprt Spindo Ls 1
4.4.6.3 Eelktroda pentanahan Local Set 0
Min 2 titik elektroda
max tahanan 2 Ohm
4.4.6.4 kabel Nyy 2x(1x70mm) Kabelindo / setara 4 Besar M 42

4.4.7 TESTING AND COMMISSIONING Ls 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 87
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.5 SUB TOTAL PEKERJAAN FIRE ALARM

4.5.1 Peralatan, Panel dan Kabel Utama


4.5.1.1 Peralatan Utama (R. Security Lt.Basement)
MCPFA Semi Addressable, 2 Loop Max. 255 Adress
4.5.1.1.1 Hooseki unit 1,00
Module Input & Output
4.5.1.1.2 Announciator (R.Security) Hooseki unit 1,00
4.5.1.1.3 Intercom Set Hooseki bh 1,00

4.5.1.2 Kabel Utama


4.5.1.2.1 Pengkabelan untuk peralatan utama Fire Alarm di Ruang Kontrol lot 1,00
4.5.1.2.2 Pengkabelan dari push button di ruang kontrol ke smoke fan di lantai atap lengkap lot 1,00
dengan push button, material bantu dan aksesories lainnya sesuai gambar dan
4.5.1.2.3 Pekerjaan grounding sistem lot 1,00

4.5.2 LANTAI BASEMENT TOWER 1 & 2


4.5.2.1 Terminal Box dan Detector
4.5.2.1.1 Termminal Box Fire Alarm Local unit 2,00
4.5.2.1.2 Smoke Detector Hooseki bh 3,00
4.5.2.1.3 Room Smoke Detector Hooseki bh
4.5.2.1.4 Fire Detector (ROR) Hooseki bh 61,00
4.5.2.1.5 Alarm Bell Hooseki bh 4,00
4.5.2.1.6 Indicator Lamp Hooseki bh 4,00
4.5.2.1.7 Manual Push Button Hooseki bh 4,00
4.5.2.1.8 Intercom Jack Hooseki bh 4,00
4.5.2.1.9 EOL Hooseki bh 4,00

4.5.2.2 Kabel Instalasi


4.5.2.2.1 Kabel NYA 2 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar ttk 4
4.5.2.2.2 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Alarm Bell Kabelindo / setara 4 Besar ttk 1
4.5.2.2.3 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Indicator Lamp Kabelindo / setara 4 Besar ttk 1
4.5.2.2.4 KabelNYA 2x(1 x1.5 mm) + konduit untuk Manual Push Button
Kabelindo / setara 4 Besar ttk 1
4.5.2.2.5 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Intercom Jack Kabelindo / setara 4 Besar ttk 1
4.5.2.2.6 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Flow Switch dan Temper
Kabelindo
Switch
/ setara 4 Besar ttk 0

4.5.3 LANTAI 1 TOWER 1


4.5.3.1 Terminal Box dan Detector
4.5.3.1.1 Terminal Box Fire Alarm Local unit 1,00
4.5.3.1.2 Smoke Detector Hooseki bh 3,00
4.5.3.1.3 Room Smoke Detector Hooseki bh
4.5.3.1.4 Fire Detector (ROR) Hooseki bh 14,00
4.5.3.1.5 Alarm Bell Hooseki bh 2,00
4.5.3.1.6 Indicator Lamp Hooseki bh 2,00
4.5.3.1.7 Manual Push Button Hooseki bh 2,00
4.5.3.1.8 Intercom Jack Hooseki bh 2,00
4.5.3.1.9 EOL Hooseki bh 2,00

4.5.3.2 Kabel Instalasi


4.5.3.2.1 Kabel NYA 2 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar ttk 1
4.5.3.2.2 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Alarm Bell Kabelindo / setara 4 Besar ttk 0
4.5.3.2.3 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Indicator Lamp Kabelindo / setara 4 Besar ttk 0
4.5.3.2.4 KabelNYA 2x(1 x1.5 mm) + konduit untuk Manual Push Button
Kabelindo / setara 4 Besar ttk 0
4.5.3.2.5 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Intercom Jack Kabelindo / setara 4 Besar ttk 0
4.5.3.2.6 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Flow Switch dan Temper
Kabelindo
Switch
/ setara 4 Besar ttk 0
4.5.3.2.7 EOL ttk 0

4.5.4 LANTAI 2 TOWER 1


4.5.4.1 Terminal Box dan Detector
4.5.4.1.1 Terminal Box Fire Alarm Local unit 1,00
4.5.4.1.2 Smoke Detector Hooseki bh 2,00
4.5.4.1.3 Fire Detector (ROR) Hooseki bh 18,00
4.5.4.1.4 Fix Detector Hooseki bh
4.5.4.1.5 Alarm Bell Hooseki bh 2,00
4.5.4.1.6 Indicator Lamp Hooseki bh 2,00
4.5.4.1.7 Manual Push Button Hooseki bh 2,00
4.5.4.1.8 Intercom Jack Hooseki bh 2,00
4.5.4.1.9 EOL Hooseki bh 2,00

4.5.4.2 Kabel Instalasi


4.5.4.2.1 Kabel NYA 2 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar ttk 2
4.5.4.2.2 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Alarm Bell Kabelindo / setara 4 Besar ttk 0
4.5.4.2.3 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Indicator Lamp Kabelindo / setara 4 Besar ttk 0

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 88
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.5.4.2.4 KabelNYA 2x(1 x1.5 mm) + konduit untuk Manual Push Button
Kabelindo / setara 4 Besar ttk 0
4.5.4.2.5 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Intercom Jack Kabelindo / setara 4 Besar ttk 0
4.5.4.2.6 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Flow Switch dan Temper
Kabelindo
Switch
/ setara 4 Besar ttk 0
4.5.4.2.7 EOL ttk 0

4.5.5 LANTAI 3 TOWER 1


4.5.5.1 Terminal Box dan Detector
4.5.5.1.1 Terminal Box Fire Alarm Local unit 1,00
4.5.5.1.2 Smoke Detector Hooseki bh 9,00
4.5.5.1.3 Room Smoke Detector Hooseki bh
4.5.5.1.4 Fire Detector (ROR) Hooseki bh 11,00
4.5.5.1.5 Alarm Bell Hooseki bh 1,00
4.5.5.1.6 Indicator Lamp Hooseki bh 1,00
4.5.5.1.7 Manual Push Button Hooseki bh 1,00
4.5.5.1.8 Intercom Jack Hooseki bh 1,00
4.5.5.1.9 EOL Hooseki bh 2,00

4.5.5.2 Kabel Instalasi


4.5.5.2.1 Kabel NYA 2 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar ttk 2
4.5.5.2.2 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Alarm Bell Kabelindo / setara 4 Besar ttk 0
4.5.5.2.3 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Indicator Lamp Kabelindo / setara 4 Besar ttk 0
4.5.5.2.4 KabelNYA 2x(1 x1.5 mm) + konduit untuk Manual Push Button
Kabelindo / setara 4 Besar ttk 0
4.5.5.2.5 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Intercom Jack Kabelindo / setara 4 Besar ttk 0
4.5.5.2.6 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Flow Switch dan Temper
Kabelindo
Switch
/ setara 4 Besar ttk 0
4.5.5.2.7 EOL ttk 0

4.5.6 LANTAI 4 ~ 11 TOWER (Volume sudah termasuk 8 lantai)


4.5.6.1 Terminal Box dan Detector
4.5.6.1.1 Terminal Box Fire Alarm Local unit 8,00
4.5.6.1.2 Smoke Detector Hooseki bh 16,00
4.5.6.1.3 Room Smoke Detector Hooseki bh 128,00
4.5.6.1.4 Fire Detector (ROR) Hooseki bh 16,00
4.5.6.1.5 Alarm Bell Hooseki bh 16,00
4.5.6.1.6 Indicator Lamp Hooseki bh 16,00
4.5.6.1.7 Manual Push Button Hooseki bh 16,00
4.5.6.1.8 Intercom Jack Hooseki bh 16,00
4.5.6.1.9 EOL Hooseki bh 16,00

4.5.6.2 Kabel Instalasi


4.5.6.2.1 Kabel NYA 2 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar ttk 152
4.5.6.2.2 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Alarm Bell Kabelindo / setara 4 Besar ttk 16
4.5.6.2.3 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Indicator Lamp Kabelindo / setara 4 Besar ttk 16
4.5.6.2.4 KabelNYA 2x(1 x1.5 mm) + konduit untuk Manual Push Button
Kabelindo / setara 4 Besar ttk 16
4.5.6.2.5 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Intercom Jack Kabelindo / setara 4 Besar ttk 16
4.5.6.2.6 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Flow Switch dan Temper
Kabelindo
Switch
/ setara 4 Besar ttk 16
4.5.6.2.7 EOL ttk 8

4.5.7 LANTAI 12 & 13 TOWER 1 (Volume sudah termasuk 2 lantai)


4.5.7.1 Terminal Box dan Detector
4.5.7.1.1 Terminal Box Fire Alarm Local unit 2,00
4.5.7.1.2 Smoke Detector Hooseki bh 4,00
4.5.7.1.3 Room Smoke Detector Hooseki bh 24,00
4.5.7.1.4 Fire Detector (ROR) Hooseki bh 16,00
4.5.7.1.5 Alarm Bell Hooseki bh 4,00
4.5.7.1.6 Indicator Lamp Hooseki bh 4,00
4.5.7.1.7 Manual Push Button Hooseki bh 4,00
4.5.7.1.8 Intercom Jack Hooseki bh 4,00
4.5.7.1.9 EOL Hooseki bh 4,00

4.5.7.2 Kabel Instalasi


4.5.7.2.1 Kabel NYA 2 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar ttk 44
4.5.7.2.2 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Alarm Bell Kabelindo / setara 4 Besar ttk 4
4.5.7.2.3 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Indicator Lamp Kabelindo / setara 4 Besar ttk 4
4.5.7.2.4 KabelNYA 2x(1 x1.5 mm) + konduit untuk Manual Push Button
Kabelindo / setara 4 Besar ttk 4
4.5.7.2.5 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Intercom Jack Kabelindo / setara 4 Besar ttk 4
4.5.7.2.6 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Flow Switch dan Temper
Kabelindo
Switch
/ setara 4 Besar ttk 4
4.5.7.2.7 EOL ttk 2

4.5.8 LANTAI 14 TOWER 1


4.5.8.1 Terminal Box dan Detector

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 89
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.5.8.1.1 Terminal Box Fire Alarm Local unit 1,00


4.5.8.1.2 Smoke Detector Hooseki bh 2,00
4.5.8.1.3 Room Smoke Detector Hooseki bh 6,00
4.5.8.1.4 Fire Detector (ROR) Hooseki bh 8,00
4.5.8.1.5 Fix Detector Hooseki bh
4.5.8.1.6 Alarm Bell Hooseki bh 2,00
4.5.8.1.7 Indicator Lamp Hooseki bh 2,00
4.5.8.1.8 Manual Push Button Hooseki bh 2,00
4.5.8.1.9 Intercom Jack Hooseki bh 2,00
4.5.8.1.10 EOL bh 2,00

LANTAI 14 TOWER 1
4.5.8.2 Kabel Instalasi
4.5.8.2.1 Kabel NYA 2 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar ttk 16
4.5.8.2.2 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Alarm Bell Kabelindo / setara 4 Besar ttk 2
4.5.8.2.3 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Indicator Lamp Kabelindo / setara 4 Besar ttk 2
4.5.8.2.4 KabelNYA 2x(1 x1.5 mm) + konduit untuk Manual Push Button
Kabelindo / setara 4 Besar ttk 2
4.5.8.2.5 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Intercom Jack Kabelindo / setara 4 Besar ttk 2
4.5.8.2.6 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Flow Switch dan Temper
Kabelindo
Switch
/ setara 4 Besar ttk 2
4.5.8.2.7 EOL ttk 1

4.5.9 LANTAI ATAP


4.5.9.1 Terminal Box dan Detector
4.5.9.1.1 Smoke Detector Hooseki bh 2,00
4.5.9.1.2 Fire Detector (ROR) Hooseki bh 2,00
4.5.9.1.3 Alarm Bell Hooseki bh 1,00
4.5.9.1.4 Indicator Lamp Hooseki bh 1,00
4.5.9.1.5 Manual Push Button Hooseki bh 1,00
4.5.9.1.6 Intercom Jack Hooseki bh 1,00
4.5.9.1.7 EOL Hooseki bh 1,00

4.5.9.2 Kabel Instalasi


4.5.9.2.1 Kabel NYA 2 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar ttk 4
4.5.9.2.2 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Alarm Bell Kabelindo / setara 4 Besar ttk 1
4.5.9.2.3 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Indicator Lamp Kabelindo / setara 4 Besar ttk 1
4.5.9.2.4 KabelNYA 2x(1 x1.5 mm) + konduit untuk Manual Push Button
Kabelindo / setara 4 Besar ttk 1
4.5.9.2.5 Kabel NYA 2x(1 x1.5 mm) + konduit untuk Intercom Jack Kabelindo / setara 4 Besar ttk 1

4.5.10 Kabel Feedder


4.5.10.1 Dari MDF MCFA ke TBFA Basement
4.5.10.1.1 Kabel NYA 7 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 23,00
4.5.10.2 Dari MDF MCFA ke TBFA lt-01
4.5.10.2.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 32,00
4.5.10.3 Dari MDF MCFA ke TBFA Lt-02
4.5.10.3.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 32,00
4.5.10.4 Dari MDF MCFA ke TBFA Lt-03
4.5.10.4.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 36,00
4.5.10.5 Dari MDF MCFA ke TBFA Lt-04
4.5.10.5.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 39,00
4.5.10.6 Dari MDF MCFA ke TBFA Lt-05
4.5.10.6.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 42,50
4.5.10.7 Dari MDF MCFA ke TBFA Lt-06
4.5.10.7.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 46,00
4.5.10.8 Dari MDF MCFA ke TBFA Lt-07
4.5.10.8.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 49,50
4.5.10.9 Dari MDF MCFA ke TBFA Lt-08
4.5.10.9.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 53,00
4.5.10.10 Dari MDF MCFA ke TBFA Lt-09
4.5.10.10.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 56,50
4.5.10.11 Dari MDF MCFA ke TBFA Lt-10
4.5.10.11.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 60,00
4.5.10.12 Dari MDF MCFA ke TBFA Lt-11
4.5.10.12.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 63,50
4.5.10.13 Dari MDF MCFA ke TBFA Lt-12
4.5.10.13.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 67,00
4.5.10.14 Dari MDF MCFA ke TBFA Lt-13
4.5.10.14.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 70,50
4.5.10.15 Dari MDF MCFA ke TBFA Lt-14
4.5.10.15.1 Kabel NYA 5 x 1 x 1.5 mm² + konduit untuk Detector Kabelindo / setara 4 Besar M 74,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 90
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.6 SUB TOTAL PEKERJAAN TATA SUARA

4.6.1 Peralatan, Panel dan Kabel Utama


4.6.1.1 Peralatan Utama (R. Engineering Lt. Basement Tower 1)
4.6.1.1.1 MDFTS Kap. ... Pairs Local unit 1,00
4.6.1.1.2 Speaker Selector 10 Zone Toa unit 1,00
4.6.1.1.3 Power Amplifier 360 W Toa unit 6,00
4.6.1.1.4 Mixer Amplifier Toa unit 1,00
4.6.1.1.5 Mixer Pre - Amplifier Toa unit 1,00
4.6.1.1.6 Radio Tuner Toa unit 1,00
4.6.1.1.7 Dvd Player c/w USB Port Toa unit 1,00
4.6.1.1.8 Microphone Control (Lobby Utama) Toa unit 2,00
4.6.1.1.9 Microphone Control Toa unit 1,00
4.6.1.1.10 Relay c/w Sirine Module Toa Set 1,00
4.6.1.1.11 UPS 1 Kva c/w Battery Nicad 30 menit General alarm, Rectifier, Surger Arrester, power Set 1,00
supply & lainnya.
4.6.1.1.12 Rak Peralatan (Provisional) Toa lot 1,00

4.6.1.2 Kabel Utama


4.6.1.2.1 Pengkabelan untuk peralatan utama Tata Suara R. Kontrol Kabelindo / setara 4 Besar lot 1,00
4.6.1.2.2 Pekerjaan grounding sistem lot 1

4.6.1.2.3 Dari MDFTS :


4.6.1.2.3.1 NYMHY 2 x 2.5 mm + conduit ke TBTS BASEMENT TOWERKabelindo
1 / setara 4 Besar M 76
4.6.1.2.3.2 NYMHY 2 x 2.5 mm + conduit ke TBTS BASEMENT TOWERKabelindo
2 / setara 4 Besar M 96
4.6.1.2.3.3 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.1 TOWER 1 Kabelindo / setara 4 Besar M 80
4.6.1.2.3.4 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.2 TOWER 1 Kabelindo / setara 4 Besar M 85
4.6.1.2.3.5 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.3 TOWER 1 Kabelindo / setara 4 Besar M 89
4.6.1.2.3.6 NYMHY2 x 2.5 mm + conduit ke TBTS LT.4 TOWER 1 Kabelindo / setara 4 Besar M 90
4.6.1.2.3.7 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.5 TOWER 1 Kabelindo / setara 4 Besar M 93
4.6.1.2.3.8 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.6 TOWER 1 Kabelindo / setara 4 Besar M 97
4.6.1.2.3.9 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.7 TOWER 1 Kabelindo / setara 4 Besar M 100
4.6.1.2.3.10 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.8 TOWER 1 Kabelindo / setara 4 Besar M 103
4.6.1.2.3.11 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.9 TOWER 1 Kabelindo / setara 4 Besar M 106
4.6.1.2.3.12 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.10 TOWER 1 Kabelindo / setara 4 Besar M 109
4.6.1.2.3.13 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.11 TOWER 1 Kabelindo / setara 4 Besar M 112
4.6.1.2.3.14 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.12 TOWER 1 Kabelindo / setara 4 Besar M 115
4.6.1.2.3.15 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.13 TOWER 1 Kabelindo / setara 4 Besar M 120
4.6.1.2.3.16 NYMHY 2 x 2.5 mm + conduit ke TBTS LT.14 TOWER 1 Kabelindo / setara 4 Besar M 124

4.6.2 Lantai Basement Tower 1 & 2


4.6.2.1 Terminal Box dan Speaker
4.6.2.1.1 TBTS Local unit 2
4.6.2.1.2 Ceiling Speaker Toa bh 37,00
4.6.2.1.3 Horn Speaker Toa bh 6,00
4.6.2.1.4 Box Horn Speaker 15 Watt Toa bh 3,00
4.6.2.1.5 Volume Control Toa bh 3,00

4.6.2.2 Kabel Instalasi


4.6.2.2.1 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Ceiling SpeakerKabelindo / setara 4 Besar ttk 2
4.6.2.2.2 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Horn Speaker Kabelindo / setara 4 Besar ttk 1
4.6.2.2.3 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Box Horn Speaker
Kabelindo / setara 4 Besar ttk 0

4.6.3 Lantai 1 Tower 1


4.6.3.1 Terminal Box dan Speaker
4.6.3.1.1 TBTS Local unit 1
4.6.3.1.2 Ceiling Speaker Toa bh 13,00
4.6.3.1.3 Box Horn Speaker 15 Watt Toa bh 2,00
4.6.3.1.4 Volume Control Toa bh 3,00

4.6.3.2 Kabel Instalasi


4.6.3.2.1 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Ceiling SpeakerKabelindo / setara 4 Besar ttk 1
4.6.3.2.2 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Box Horn Speaker
Kabelindo / setara 4 Besar ttk 0
0,00

4.6.4 Lantai 2 Tower 1


4.6.4.1 Terminal Box dan Speaker
4.6.4.1.1 TBTS Local unit 1
4.6.4.1.2 Ceiling Speaker Toa bh 9,00
4.6.4.1.3 Box Horn Speaker 15 Watt Toa bh 7,00
4.6.4.1.4 Volume Control Toa bh 1,00

4.6.4.2 Kabel Instalasi

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 91
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.6.4.2.1 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Ceiling SpeakerKabelindo / setara 4 Besar ttk 0
4.6.4.2.2 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Box Horn Speaker
Kabelindo / setara 4 Besar ttk 0

4.6.5 Lantai 3 Tower 1


4.6.5.1 Terminal Box dan Speaker
4.6.5.1.1 TBTS Local unit 1
4.6.5.1.2 Ceiling Speaker Toa bh 10,00
4.6.5.1.3 Box Horn Speaker 15 Watt Toa bh 2,00
4.6.5.1.4 Volume Control Toa bh 7,00

4.6.5.2 Kabel Instalasi


4.6.5.2.1 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Ceiling SpeakerKabelindo / setara 4 Besar ttk 2
4.6.5.2.2 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Box Horn Speaker
Kabelindo / setara 4 Besar ttk 0

4.6.6 Lantai 4 ~ 11 Tower 1 (Volume sudah termasuk 8 lantai)


4.6.6.1 Terminal Box dan Speaker
4.6.6.1.1 TBTS Local unit 8
4.6.6.1.2 Ceiling Speaker Toa bh 200,00
4.6.6.1.3 Box Horn Speaker 15 Watt Toa bh 16,00
4.6.6.1.4 Volume Control Toa bh 8,00

4.6.6.2 Kabel Instalasi


4.6.6.2.1 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Ceiling SpeakerKabelindo / setara 4 Besar ttk 200
4.6.6.2.2 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Box Horn Speaker
Kabelindo / setara 4 Besar ttk 16

4.6.7 Lantai 12 & 13 Tower 1 (Volume sudah termasuk 2 lantai)


4.6.7.1 Terminal Box dan Speaker
4.6.7.1.1 TBTS Local unit 2
4.6.7.1.2 Ceiling Speaker Toa bh 42,00
4.6.7.1.3 Box Horn Speaker 15 Watt Toa bh 4,00
4.6.7.1.4 Volume Control Toa bh 2,00

4.6.7.2 Kabel Instalasi


4.6.7.2.1 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Ceiling SpeakerKabelindo / setara 4 Besar ttk 42
4.6.7.2.2 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Box Horn Speaker
Kabelindo / setara 4 Besar ttk 4

4.6.8 Lantai 14 Tower 1


4.6.8.1 Terminal Box dan Speaker 0
4.6.8.1.1 TBTS Local unit 1
4.6.8.1.2 Ceiling Speaker Toa bh 15,00
4.6.8.1.3 Box Horn Speaker 15 Watt Toa bh 2,00
4.6.8.1.4 Volume Control Toa bh

Lantai 14 Tower 1
4.6.8.2 Kabel Instalasi
4.6.8.2.1 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Ceiling SpeakerKabelindo / setara 4 Besar ttk 15
4.6.8.2.2 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Box Horn Speaker
Kabelindo / setara 4 Besar ttk 2

4.6.9 LANTAI ATAP TOWER 1


4.6.9.1 Terminal Box dan Speaker
4.6.9.1.1 Ceiling Speaker Toa bh 2,00
4.6.9.1.2 Box Horn Speaker 15 Watt Toa bh 2,00

4.6.9.2 Kabel Instalasi


4.6.9.2.1 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Ceiling SpeakerKabelindo / setara 4 Besar ttk 2
4.6.9.2.2 Kabel NYMHY 2 X 1.5 mm² + Konduit Untuk Box Horn Speaker
Kabelindo / setara 4 Besar ttk 2

4.7 SUB TOTAL PEKERJAAN TELEPON

4.7.1 Peralatan, Panel


4.7.1.1 IP PABX 20 PTT/256 EXT unit 1,00
4.7.1.2 UPS 1 Kva c/w Battery Nicad 30 menit General Alarm,Line Arrester Rectifier, power set 1,00
supply & lainnya.

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 92
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.8 SUB TOTAL PEKERJAAN MATV DAN DATA

4.8.1 PEKERJAAN ELEKTRONIK


4.8.1.1 Peralatan, Panel dan Kabel Utama
4.8.1.1.1 Router Board Mikrotek bh 1
4.8.1.1.2 NMS Server Dell bh 1
4.8.1.1.3 Streaming Server Dell bh 1
4.8.1.1.4 Router Mikrotek bh 5
4.8.1.1.5 Switch Port Lantai HP bh 17
4.8.1.1.6 STB Unit Android Box bh 200
4.8.1.1.7 Wireless Unit Kamar Huawei bh 160
4.8.1.1.8 Unifi AP UBQiti bh 5
4.8.1.1.9 Rack System Local bh 1

4.8.1.2 Dari Router ke Switch Port Lantai


4.8.1.2.1 Kabel Cat6 + Conduit ke Lt. BS Tower 1 Belden M 20,00
4.8.1.2.2 Kabel Cat6 + Conduit ke Lt. 1 Tower 1 Belden M 8,00
4.8.1.2.3 Kabel Cat6 + Conduit ke Lt. 2 Tower 1 Belden M 22,00
4.8.1.2.4 Kabel Cat6 + Conduit ke Lt. 3 Tower 1 Belden M 26,00
4.8.1.2.5 Kabel Cat6 + Conduit ke Lt. 4 Tower 1 Belden M 30,00
4.8.1.2.6 Kabel Cat6 + Conduit ke Lt. 5 Tower 1 Belden M 34,00
4.8.1.2.7 Kabel Cat6 + Conduit ke Lt. 6 Tower 1 Belden M 38,00
4.8.1.2.8 Kabel Cat6 + Conduit ke Lt. 7 Tower 1 Belden M 42,00
4.8.1.2.9 Kabel Cat6 + Conduit ke Lt. 8 Tower 1 Belden M 46,00
4.8.1.2.10 Kabel Cat6 + Conduit ke Lt. 9 Tower 1 Belden M 50,00
4.8.1.2.11 Kabel Cat6 + Conduit ke Lt. 10 Tower 1 Belden M 54,00
4.8.1.2.12 Kabel Cat6 + Conduit ke Lt. 11 Tower 1 Belden M 58,00
4.8.1.2.13 Kabel Cat6 + Conduit ke Lt. 12 Tower 1 Belden M 62,00
4.8.1.2.14 Kabel Cat6 + Conduit ke Lt. 13 Tower 1 Belden M 66,00
4.8.1.2.15 Kabel Cat6 + Conduit ke Lt. 14 Tower 1 Belden M 70,00

4.8.1.2 Dari Switch Port Lantai ke STB Unit


4.8.1.2.1 Kabel Cat6 + Conduit Belden ttk 200,00

4.9 SUB TOTAL PEKERJAAN CCTV

4.9.1 Peralatan, Panel dan Kabel Utama


4.9.1.1 Peralatan Utama
4.9.1.1.1 Monitor LED (Spot) Sucher unit 1,00
4.9.1.1.2 Monitor LED 32" Sucher unit 4,00
4.9.1.1.3 Keyboard digital bh 1,00

4.9.1.2 Kabel Utama


4.9.1.2.1 Pengkabelan untuk peralatan utama CCTV dan setting Belden lot 1,00
4.9.1.2.2 Pekerjaan grounding sistem lot 1,00
4.9.1.2.3 Kabel Coaxial Cable RG-11 untuk DMR Belden lot 4,00

4.9.1.3 LANTAI BASEMENT TOWER 1 &2


4.9.1.3.1 Camera
4.9.1.3.1.1 IP Camera Sucher bh 13

4.9.1.3.2 Kabel Instalasi


4.9.1.3.2.1 NYM 2x1.5 mm² + Kabel Cat6 + Konduit untuk camera Kabelindo / setara 4 Besar ttk 13,00

4.9.1.3 LANTAI 1 TOWER 1


4.9.1.3.1 Camera
4.9.1.3.1.1 IP Camera Sucher bh 6

4.9.1.3.2 Kabel Instalasi


4.9.1.3.2.1 NYM 2x1.5 mm² + Kabel Cat6 + Konduit untuk camera Kabelindo / setara 4 Besar ttk 6,00

4.9.1.4 LANTAI 2 TOWER 1


4.9.1.4.1 Camera
4.9.1.4.1.1 IP Camera Sucher bh 7

4.9.1.4.2 Kabel Instalasi


4.9.1.4.2.1 NYM 2x1.5 mm² + Kabel Cat6 + Konduit untuk camera Kabelindo / setara 4 Besar ttk 7,00

4.9.1.5 LANTAI 3 TOWER 1


4.9.1.5.1 Camera
4.9.1.5.1.1 IP Camera Sucher bh 3

4.9.1.5.2 Kabel Instalasi

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 93
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.9.1.5.2.1 NYM 2x1.5 mm² + Kabel Cat6 + Konduit untuk camera Kabelindo / setara 4 Besar ttk 3,00

4.9.1.6 LANTAI 4 ~ 14 TOWER 1 (Volume sudah termasuk 11 lantai)


4.9.1.6.1 Camera
4.9.1.6.1.1 Dome Camera Color Fixed c/w Varifocal Lens Sucher bh 55

4.9.1.6.2 Kabel Instalasi


4.9.1.6.2.1 NYM 2x1.5 mm² + Kabel Cat6 + Konduit untuk camera Kabelindo / setara 4 Besar ttk 55,00

4.10 SUB TOTAL PEKERJAAN TRAY KABEL

4.10.1 ELEKTRIKAL
4.10.1.1 Lantai Basement 1
4.10.1.1.1 Kabel Tranch W = 400 x 100 mm Tri Abadi M 11
4.10.1.1.2 Kabel Ladder W = 500 mm T = 100 mm Tri Abadi M 119
4.10.1.1.3 Kabel Ladder W = 300 mm T = 100 mm Tri Abadi M 1
4.10.1.1.4 Kabel Tranch W = 300 x 100 mm Tri Abadi M 8
4.10.1.1.5 Material Bantu + Fitting lot 0

4.10.1.2 Lantai 1-3


4.10.1.2.1 Kabel Tranch W = 300 x 100 mm Tri Abadi M 13
4.10.1.2.2 Material Bantu + Fitting lot 0

4.10.1.3 Lantai 4-14


4.10.1.3.1 Kabel Tranch W = 300 x 100 mm Tri Abadi M 250
4.10.1.3.2 Material Bantu + Fitting lot 1

4.10.1.4 Kabel laddder shaft


4.10.1.4.1 Kabel Ladder W = 500 mm T = 100 mm Tri Abadi M 10
4.10.1.4.2 Material Bantu + Fitting lot 1

4.10.2 ELEKTRIKAL ELEKTRONIKA


4.10.2.1 Lantai Basement 1
4.10.2.1.1 Kabel Tranch W = 200 x 100 mm Tri Abadi M 11
4.10.2.1.2 Material Bantu + Fitting lot 0

4.10.2.2 Lantai 1-3


4.10.2.2.1 Kabel Tranch W = 200 x 100 mm Tri Abadi M 7
4.10.2.2.2 Material Bantu + Fitting lot 0

4.10.2.3 Lantai 4-14


4.10.2.3.1 Kabel Tranch W = 200 x 100 mm Tri Abadi M 320
4.10.2.3.2 Material Bantu + Fitting lot 1

4.10.2.4 Kabel laddder shaft


4.10.2.4.1 Kabel Ladder W = 400 mm T = 100 mm Tri Abadi M 25
4.10.2.4.2 Material Bantu + Fitting lot 1

4.11 SUB TOTAL PEKERJAAN INSTALASI GAS KITCHEN

4.11.1 PERALATAN UTAMA


4.11.1.1 Tabung Gas Elpigi 50 kg Pertamina Bh 10,00
4.11.1.2 Flexible Hose Ø 1/2" Rego Bh 10,00
4.11.1.3 Regulator High To medium Preasure Rego Bh 1,00
4.11.1.4 Regulator Medium To Low Preasure Rego Bh 1,00
4.11.1.5 Pressure gaugee Ø 1/2" Winter Bh 2,00
4.11.1.6 Ball Valve Ø 1/2" Kitz Bh 2,00
4.11.1.7 Ball Valve Ø 1" Kitz Bh 25,00
4.11.1.8 Ball Valve Ø 1-1/2" Kitz Bh 2,00
4.11.1.9 Fitting dan assesories Galunggung Ls 1,00
4.11.1.10 Alat bantu dan material batu Ls 1,00

4.11.2 INSTALASI PIPA


4.11.2.1 Pipa BSP SCh 40 Ø 1" Spindo M 25
4.11.2.2 Pipa BSP SCh 40 Ø 1-1/2" Spindo M 25
4.11.2.3 Header Pipa BSP SCh 40 Ø 2" Spindo Lot 1
4.11.2.4 Fitting dan assesories Galunggung Ls 0,50
4.11.2.5 Alat bantu dan material batu Ls 0,50

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 94
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.12 SUB PEKERJAAN PENGADAAN DAN PEMASANGAN LIFT

4.12.1 Pengadaan 3 unit KONE elevator.


4.12.1.1 PL1-2 A /105mpm /1000kg /15 Stops /HLSS 42.000,00 unit 2,00
4.12.1.2 SL1 /96mpm /1000kg /15 Stops /HLSS 41.000,00 unit 1,00
4.12.1.3 ARD (Automatic Rescue Device) Include unit 3,00

4.12.2 Pemasangan 3 unit KONE elevator.


4.12.2.1 Biaya persiapan & transportasi Lift lot 1,00
Biaya pemasangan, material lokal dan ijin depnaker
4.12.2.2 lot 1,00
berikut masa pemeliharaan selama 3 bulan

4.13 SUB PEKERJAAN PENGADAAN DAN PEMASANGAN GENSET

4.13.1 Pengadaan 1 unit Genset


4.13.1.1 Genset PERKINS 800 kVA : unit 1,00
4.13.2 Pekerjaan persiapan, Instalasi, elektrikal, exhaust system, Soundproofing & attenuator, lot 1,00

4.14 SUB PEKERJAAN SEWAGE TREATMENT PLAN

4.14.1 MEKANIKAL & ELEKTRIKAL


4.14.1.1 Pre treatment & Equalizer Reactor
4.14.1.1.1 Automatic Bar Screen Unit 1,00
Local assembled incl. S : Lokal Assembled
4.14.1.1.2 Reactor Media m3 10,00
Black Mirror Honey Com L -125 incl. Buffle support
4.14.1.1.3 Liquid Mutant Bacteria pail 1,00
4.14.1.1.4 Submersible Pump unit 2,00
Synmaywa 0.4kw/1ph/220v/50hz, 6 m3/hour
incl. Chain pump & QD : 6m3/jam

4.14.1.2 Anaerobic Reactor


4.14.1.2.1 Reactor Media m3 15,00
Black Mirror Honey Co : L - 125
4.14.1.2.2 Liquid Mutant Bacteria pail 2,00
4.14.1.2.3 Plumbing, pvc aw class ls 1,00

4.14.1.3 Aerobic Reactor


4.14.1.3.1 Reactor Media m3 27,00
Black Mirror Honey Comb L -180 incl. Buffle support
4.14.1.3.2 Liquid Mutant Bacteria pail 2,00
4.14.1.3.3 Futsu Roots Blower 2.2 kw/3ph/380v/50hz/1.600cfm unit 3,00
4.14.1.3.4 Plumbing, pvc aw class ls 1,00
4.14.1.3.5 Aerobic Diffuser pcs 72,00

4.14.1.4 Clarifier Weir Reactor


4.14.1.4.1 Tube Settler incl. Buffle support Set 1,00
4.14.1.4.2 Shimizu 0.5kw/1ph/220v/50hz/120 lpm unit 2,00

4.14.1.5 Chlorine Reactor & Clear Well


4.14.1.5.1 Multi Media Filtration : Birm, Calgon & Resin Anion Set 3,00
manual backwashing 0,00
4.14.1.5.2 Shimizu 0.5kw/1ph/220v/50hz/120 lpm unit 2,00

4.14.1.6 Electrical
4.14.1.6.1 STP Panel set 1,00
4.14.1.6.2 Ducting Exhaust unit 2,00
4.14.1.6.3 Other Plumbing & Electrical needs lot 1,00

4.14.2 ENGINEERING SYSTEM & ADVISOR


4.14.2.1 Seeding Test Comissioning System IPAL lot 1,00
4.14.2.2 Labour, Design, Advissor, tarining & Documentation lot 1,00

4.14.3 ENGINEERING LINING


4.14.3.1 Pelapisan fiber lining bak STP
4.14.3.1.1 Lapis permukaan dinding, plat lantai, plat bawah dak, m2 515,00
Lubang Dewatering, lubang bak kontrol + tutupnya
tidak termasuk clear well

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 4 : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
HALAMAN : 95
HARGA SATUAN (Rp)
HARGA
NO. URAIAN PEKERJAAN KETERANGAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

4.14.3.2 Instalasi Fresh Air ruang STP


4.14.3.2.1 Centrifugal Fan 10" + Instalasi ++ otomatis + support set 2,00
4.14.3.2.2 Plumbing, pvc 10" inc. support m' 8,00
4.14.3.2.3 Plumbing, pvc 10" inc. support m' 8,00
4.14.3.2.4 Plumbing, pvc 6" inc. support m' 42,00
4.14.3.2.5 Filling dan assesories ls 1,00
4.14.3.2.6 Alat bantu dan material batu ls 1,00

SUB TOTAL PEKERJAAN SEWAGE TREATMENT PLAN

4.14.1 MEKANIKAL & ELEKTRIKAL


4.14.2 ENGINEERING SYSTEM & ADVISOR
4.14.3 ENGINEERING LINING

4.15 SUB PEKERJAAN SAMBUNG DAYA DAN SKTR

4.15.1 Biaya PLN

4.15.1.1 Biaya Penyambungan Lot 0,00

4.15.2 Pengadaan dan Pemasangan SKTR


4.15.2.1 Biaya instalasi, legalisasi, dan supervisi Lot 0,00
4.15.2.2 Kabel NYYFGBY 4x70 mm m 0,00
4.15.2.3 Pipa Pelindung medium 2,5 mtr btg 0,00
4.15.2.4 SS trap m 0,00
4.15.2.5 link 25x25 mm bh 0,00
4.15.2.6 Stoping Buckle bh 0,00
4.15.2.7 Fixed bh 0,00
4.15.2.8 Joint bimetal AL/CU 70 bh 0,00
4.15.2.9 Tap Connector 35/70 mm bh 0,00
4.15.2.10 Pembuatan Pondasi Tiang TR bh 0,00

REKAPITULASI TOTAL PENJUMLAHAN SUB PEKERJAAN MEKANIKAL, ELEKTRONIKAL DAN PLUMBING

4.1 SUB TOTAL PEKERJAAN PLUMBING

4.2 SUB TOTAL PEKERJAAN PEMADAM KEBAKARAN

4.3 SUB TOTAL PEKERJAAN MVAC

4.4 SUB TOTAL PEKERJAAN ELEKTRIKAL

4.5 SUB TOTAL PEKERJAAN FIRE ALARM

4.6 SUB TOTAL PEKERJAAN TATA SUARA

4.7 SUB TOTAL PEKERJAAN TELEPON

4.8 SUB TOTAL PEKERJAAN MATV & DATA

4.9 SUB TOTAL PEKERJAAN CCTV

4.10 SUB TOTAL PEKERJAAN TRAY KABEL

4.11 SUB TOTAL PEKERJAAN INSTALASI GAS KITCHEN

4.12 SUB TOTAL PEKERJAAN PENGADAAN DAN PEMASANGAN LIFT

4.13 SUB TOTAL PEKERJAAN PENGADAAN DAN PEMASANGAN GENSET

4.14 SUB TOTAL PEKERJAAN SEWAGE TREATMENT PLAN

4.15 SUB TOTAL PEKERJAAN SAMBUNG DAYA DAN SKTR

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 96

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

5 PEKERJAAN INTERIOR

5.1 SUB PEKERJAAN INTERIOR LANTAI BASEMENT

5.1.1 STAFF DINNING


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.1.1.1 Dinning Table Type A unit 1,00


5.1.1.2 Dinning Table Type B (Wall Table "L" Shape) m 11,70
5.1.1.3 Dinning Chair unit 38,00
5.1.1.4 Kitchen Set (Tidak termasuk Kitchen Appliance) Set 1,00

5.1.2 HRD TRAINING ROOM


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.1.2.1 Backdrop Panel m2 90,29


5.1.2.2 Fin. Column m2 7,14

5.1.3 SECURITY ROOM

5.1.3.1 Loket unit 1,00

5.1.4 RECEIVING PURCHASING

5.1.4.1 Loket unit 1,00

5.1.5 UNIFORM ROOM


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.1.5.1 Cabinet Type A unit 1,00


5.1.5.2 Cabinet Type B unit 1,00
5.1.5.3 Cabinet Type C unit 1,00
5.1.5.4 Loket unit 1,00

5.1.6 LOCKER PRIA


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.1.6.1 Locker Type A unit 4,00


5.1.6.2 Locker Type B unit 2,00

5.1.7 LOCKER WANITA


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.1.7.1 Locker Type B unit 2,00


5.1.7.2 Locker Type C unit 1,00
5.1.7.3 Locker Type D unit 1,00

5.1.8 RUANG SERBA GUNA


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.1.8.1 Backdrop Panel m2 127,05


PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 97

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
5.1.8.2 Column Cover m2 9,87

5.1.9 LOBBY LIFT BASEMENT


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.1.9.1 Backdrop Panel m2 19,44

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.1.9.2 Credenza unit 1,00


5.1.9.3 Stool unit 2,00
5.1.9.4 Lift Jam unit 2,00

SUB TOTAL PEKERJAAN INTERIOR LANTAI BASEMENT

5.1.1 STAFF DINNING


5.1.2 HRD TRAINING ROOM
5.1.3 SECURITY ROOM
5.1.4 RECEIVING PURCHASING
5.1.5 UNIFORM ROOM
5.1.6 LOCKER PRIA
5.1.7 LOCKER WANITA
5.1.8 RUANG SERBA GUNA
5.1.9 LOBBY LIFT BASEMENT

5.2 SUB PEKERJAAN INTERIOR LANTAI 1

5.2.1 RECEPTIONIST
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.1.1 Receptionist Counter unit 1,00


5.2.1.2 Credenza unit 1,00
5.2.1.3 Round Table unit 1,00
5.2.1.4 Planter unit 1,00

5.2.2 LOUNGE
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.2.1 Round Sofa unit 15,00


5.2.2.2 Single Sofa unit 10,00
5.2.2.3 Coffee Table unit 10,00
5.2.2.4 Side Table unit 5,00

5.2.3 CONCIERGE
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.3.1 Counter Table unit 1,00


5.2.3.2 Cabinet unit 3,00

5.2.4 FRONT OFFICE


PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 98

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.4.1 Working Desk unit 2,00


5.2.4.2 Work Station unit 2,00
5.2.4.3 Working Chair unit 6,00
5.2.4.4 Round Table unit 1,00
5.2.4.5 Filing Cabinet unit 8,00

5.2.5 GM ROOM
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.5.1 Working Desk unit 1,00


5.2.5.2 Working Chair unit 2,00
5.2.5.3 GM Chair unit 1,00

5.2.6 DATA CENTER


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.6.1 Cabinet 1 unit 2,00


5.2.6.2 Cabinet 2 unit 4,00
5.2.6.3 Data Center Table unit 1,00
5.2.6.4 Working Chair unit 1,00

5.2.7 ACCESSORIES
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.7.1 Acccessories ls 1,00


5.2.7.2 Pendant Lamp ls 1,00
5.2.7.3 Standing Lamp unit 5,00
5.2.7.4 Rugs unit 5,00
5.2.7.5 Windows Accessories m 75,00

5.2.8 FINISHING CEILING


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.8.1 Fin. Wood Ceiling m2 358,60

5.2.9 FINISHING KOLOM


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.9.1 Fin. Kolom Kaca m2 150,56

5.2.10 FINISHING DINDING


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.2.10.1 Backdrop Stage m2 37,00


5.2.10.2 Backdrop Lift Lobby m2 49,58

SUB TOTAL PEKERJAAN INTERIOR LANTAI 1

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 99

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
5.2.1 RECEPTIONIST
5.2.2 LOUNGE
5.2.3 CONCIERGE
5.2.4 FRONT OFFICE
5.2.5 GM ROOM
5.2.6 DATA CENTER
5.2.7 ACCESSORIES
5.2.8 FINISHING CEILING
5.2.9 FINISHING KOLOM
5.2.10 FINISHING DINDING

5.3 SUB PEKERJAAN INTERIOR LANTAI 2

5.3.1 RESTAURANT
Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.3.1.1 Backdrop Panel Type A (kitchen Show) m2 11,18


5.3.1.2 Backdrop Panel Type B m2 18,00
5.3.1.3 Finishing Kolom Bata m2 30,60
5.3.1.4 Bar Wall Panel m2 7,79

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.3.1.5 Dinning Table Type A (dia. 800 mm x 750mm) unit 8,00


5.3.1.6 Dinning Chair Type A unit 32,00
5.3.1.7 Bar Hanging Bottle Rack unit 1,00
5.3.1.8 Bar Table uk. unit 1,00
5.3.1.9 Bar Stool unit 20,00
5.3.1.10 Bottle Rack Set 1,00
5.3.1.11 Dinning Table Type B ( uk. 1000x800x750mm ) unit 3,00
5.3.1.12 Dinning Chair Type B unit 6,00
5.3.1.13 Bench Chair Type B (2 seater) unit 8,00
5.3.1.14 Dinning Table Type C (uk. 2500x800x750mm) unit 2,00
5.3.1.15 Side Table Type C uk.1200x600x450mm) unit 1,00
5.3.1.16 Dinning Chair Type C unit 11,00
5.3.1.17 Sofa Bench Type C (5 Seater) unit 2,00
5.3.1.18 Counter uk. 2000x600x600mm unit 1,00
5.3.1.19 Supply food & Buffee Table unit 1,00
5.3.1.20 Service Table unit 2,00
5.3.1.21 Planter unit 4,00

5.3.2 RESTAURANT (EAST SIDE)


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.3.2.1 Backdrop Outdoor Terrace m2 24,03

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.3.2.2 Dinning Table Type A (dia. 800 mm x 750mm) unit 12,00


5.3.2.3 Dinning Chair Type A unit 44,00
5.3.2.4 Hanging Lamp Type A unit 16,00
5.3.2.5 Dinning Table Type C (uk. 2500x800x750mm) unit 2,00
5.3.2.6 Side Table Type C uk.1200x600x450mm) unit 1,00
PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 100

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
5.3.2.7 Dinning Chair Type C unit 9,00
5.3.2.8 Sofa Bench Type C (5 Seater) unit 2,00

5.3.3 RESTAURANT (WEST SIDE)


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.3.3.1 Dinning Table Type A (dia. 800 mm x 750mm) unit 4,00


5.3.3.2 Dinning Chair Type A unit 16,00
5.3.3.3 Hanging Lamp Type A unit 11,00
5.3.3.4 Dinning Table Type B unit 7,00
5.3.3.5 Dinning Chair Type C unit 14,00
5.3.3.6 Sofa Bench Type C (2 Seater) unit 7,00
5.3.3.7 Plant unit 4,00

5.3.4 RESTAURANT (CANOPY TERRACE)


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.3.4.1 sofa 2 Seater Outdoor unit 2,00


5.3.4.2 Single Chair Outdoor unit 5,00
5.3.4.3 Outdoor Chair unit 32,00
5.3.4.4 Stool Outdoor unit 17,00
5.3.4.5 Puff Outdoor unit 5,00
5.3.4.6 Bench Outdoor m 5,00
5.3.4.7 Coffee Table A unit 1,00
5.3.4.8 Coffee Table B unit 4,00
5.3.4.9 Coffee Table C unit 7,00
5.3.4.10 Coffee Table D unit 4,00
5.3.4.11 Dinning Table m 14,80

5.3.5 ACCESSORIES
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.3.5.1 Assesories ls 1,00


5.3.5.2 Windows Accessories m 46,79

5.3.6 FINISHING CEILING


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.3.6.1 Fin. Wood Ceiling m2 323,72

SUB TOTAL PEKERJAAN INTERIOR LANTAI 2

5.3.1 RESTAURANT
5.3.2 RESTAURANT (EAST SIDE)
5.3.3 RESTAURANT (WEST SIDE)
5.3.4 RESTAURANT (CANOPY TERRACE)
5.3.5 ACCESSORIES
5.3.6 FINISHING CEILING

5.4 SUB PEKERJAAN INTERIOR LANTAI 3

5.4.1 PRE FUNCTION

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 101

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.1.1 Backdrop Type A m2 27,00


5.4.1.2 Backdrop Type B m2 24,75
5.4.1.3 Backdrop Type C m2 22,50

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.1.4 Artwork unit 3,00

5.4.2 BUSINESS ROOM


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.2.1 L Shape Table unit 1,00


5.4.2.2 Working Desk unit 1,00
5.4.2.3 Working Chair unit 4,00
5.4.2.4 Sofa 2 Seater unit 1,00
5.4.2.5 Sofa single unit 1,00
5.4.2.6 Round Table unit 2,00
5.4.2.7 Cabinet unit 1,00

5.4.3 F&B ROOM


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.3.1 Working Desk unit 1,00


5.4.3.2 Working Chair unit 3,00
5.4.3.3 Cabinet unit 1,00

5.4.4 STORAGE
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.4.1 Cabinet unit 1,00

5.4.5 CORRIDOR
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.5.1 Cabinet Corridor ls 1,00

5.4.6 FINISHING CEILING


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.6.1 Fin. Ceiling m2 346,14

5.4.7 MEETING ROOM


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.7.1 Backdrop Type A m2 143,10


5.4.7.2 Backdrop Type B m2 54,00
PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 102

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.
5.4.7.3 Credenza unit 6,00
5.4.7.4 Meeting Table unit 6,00
5.4.7.5 Meeting Chair unit 108,00

5.4.8 MOVABLE PARTITION


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.8.1 Movable Partition m2 197,10

5.4.9 ACCESSORIES
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.9.1 Acccessories ls 1,00


5.4.9.2 Roller Blind unit 14,00

5.4.10 FINISHING KOLOM


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.4.10.1 Fin. Kolom m2 182,25

SUB TOTAL PEKERJAAN INTERIOR LANTAI 3

5.4.1 PRE FUNCTION


5.4.2 BUSINESS ROOM
5.4.3 F&B ROOM
5.4.4 STORAGE
5.4.5 CORRIDOR
5.4.6 FINISHING CEILING
5.4.7 MEETING ROOM
5.4.8 MOVABLE PARTITION
5.4.9 ACCESSORIES
5.4.10 FINISHING KOLOM

5.5 SUB PEKERJAAN INTERIOR LOBBY LIFT (LT.1-14) & KORIDOR (LT. 4-14)

5.5.1 LOBBY LIFT (Lantai 1 - 14)


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.5.1.1 Backdrop Panel m2 272,16

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.5.1.2 Credenza unit 14,00


5.5.1.3 Stool unit 28,00
5.5.1.4 Lift Jamb ( Hotel ) unit 30,00
5.5.1.5 Lift Jamb ( Service ) unit 15,00

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 103

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
5.5.2 LIFT SERVICE AREA (Lantai 1 - 14)
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.5.2.1 Cabinet unit 14,00

SUB TOTAL PEKERJAAN INTERIOR LOBBY LIFT (LT.1-14) & KORIDOR (LT. 4-14)

5.5.1 LOBBY LIFT (Lantai 1 - 14)


5.5.2 LIFT SERVICE AREA (Lantai 1 - 14)

5.6 SUB PEKERJAAN INTERIOR KAMAR HOTEL

5.6.1 UNIT DELUXE 1 ROOM ( 95 unit )


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.1.1 Backdrop Panel Deluxe Room uk. 1800 x 2400 x 90 mm unit 95,00
Backdrop Panel TV & Mirror; uk. 3575x700x130mm; Cermin
5.6.1.2 unit 95,00
700x700mm

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.1.3 Bed Head, uk. 1800 x 1200 x 100 mm unit 95,00


5.6.1.4 Side Table; uk. 550 x 400 x 450 mm unit 190,00
5.6.1.5 Dressing Table, uk. 2100 x 550 x 80 mm unit 95,00
5.6.1.6 Refrigerator Cabinet, uk. 600 x 550 x 650 mm unit 95,00
5.6.1.7 Wall Rack (Ambalan), uk. 500 x 300 x 20 mm unit 95,00
5.6.1.8 Cabinet Wardrobe, uk. 800 x 700 x 380 mm unit 95,00
5.6.1.9 Save Deposit Box, uk. 800 x 550 x 380 mm unit 95,00
5.6.1.10 Sandal / Shoe Rack, uk. 1950x550x20mm unit 95,00
5.6.1.11 Dressing Chair unit 95,00
5.6.1.12 Arm Chair unit 95,00
5.6.1.13 Wall Lamp unit 190,00
5.6.1.14 Curtain unit 95,00
5.6.1.15 Accessories unit 95,00

5.6.2 UNIT TWIN 2 ROOM ( 40 unit )


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.2.1 Backdrop Panel Deluxe Room uk. 1800 x 2400 x 90 mm unit 40,00
Backdrop Panel TV & Mirror; uk. 3575x700x130mm; Cermin
5.6.2.2 unit 40,00
700x700mm

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.2.3 Bed Head, uk. 1000 x 1200 x 100 mm unit 80,00


5.6.2.4 Side Table; uk. 550 x 400 x 450 mm unit 80,00
5.6.2.5 Dressing Table, uk. 2100 x 550 x 80 mm unit 40,00
5.6.2.6 Refrigerator Cabinet, uk. 600 x 550 x 650 mm unit 40,00
5.6.2.7 Wall Rack (Ambalan), uk. 500 x 300 x 20 mm unit 40,00
5.6.2.8 Cabinet Wardrobe, uk. 800 x 700 x 380 mm unit 40,00
5.6.2.9 Save Deposit Box, uk. 800 x 550 x 380 mm unit 40,00
5.6.2.10 Sandal / Shoe Rack, uk. 1950x550x20mm unit 40,00
PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 104

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
5.6.2.11 Dressing Chair unit 40,00
5.6.2.12 Wall Lamp unit 80,00
5.6.2.13 Curtain unit 40,00
5.6.2.14 Accessories unit 40,00

5.6.3 UNIT APARTMENT ROOM ( 8 unit )


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.3.1 Backdrop Panel TV & Mirror; uk. 2660 x 700 x 130 mm unit 8,00
5.6.3.2 Bed Panel unit 8,00
5.6.3.3 Panel partisi divider unit 8,00

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.3.3 Bed Head, uk. 1900 x 2400 x 200 mm unit 8,00


5.6.3.4 Side Table; uk. 550 x 400 x 450 mm unit 16,00
5.6.3.5 Dressing Table, uk. 2100 x 550 x 80 mm unit 8,00
5.6.3.6 Cabinet Wardrobe, uk. 1200 x 2400 mm unit 8,00
5.6.3.7 Writing Chair unit 16,00
5.6.3.8 Single Sofa unit 8,00
5.6.3.9 Sofa 2 Seater unit 8,00
5.6.3.10 Round Table, uk. Dia 600 x 600 x 450 mm unit 8,00
5.6.3.11 Wall Lamp unit 16,00
5.6.3.12 Curtain unit 8,00
5.6.3.13 Kitchen Set unit 8,00
5.6.3.14 Dining Table unit 8,00
5.6.3.15 Accessories unit 16,00
5.6.3.16 Backsplash Kitchen ex Solid Surface Hanex unit 8,00

5.6.4 UNIT JUNIOR SUITES ROOM ( 8 unit )


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.4.1 Backdrop Panel TV & Mirror; uk. 2660 x 700 x 130 mm unit 8,00
5.6.4.2 Bed Panel unit 8,00

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.4.3 Bed Head, uk. 1900 x 2400 x 200 mm unit 8,00


5.6.4.4 Side Table; uk. 550 x 400 x 450 mm unit 16,00
5.6.4.5 Dressing Table, uk. 2100 x 550 x 80 mm unit 8,00
5.6.4.6 Cabinet Wardrobe, uk. 1200 x 2400 mm unit 8,00
5.6.4.7 Writing Chair unit 16,00
5.6.4.8 Single Sofa unit 8,00
5.6.4.9 Sofa 2 Seater unit 8,00
5.6.4.10 Round Table, uk. Dia 600 x 600 x 450 mm unit 8,00
5.6.4.11 Wall Lamp unit 16,00
5.6.4.12 Curtain unit 8,00
5.6.4.13 Kitchen Set unit 8,00
5.6.4.14 Dining Table unit 8,00
5.6.4.15 Accessories unit 16,00
5.6.4.16 Backsplash Kitchen ex Solid Surface Hanex unit 8,00

5.6.5 UNIT PRESIDENTIAL SUITES ROOM ( 1 unit )


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.
PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT
PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 105

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL

5.6.5.1 Backdrop Panel TV & Mirror; uk. 2660 x 700 x 130 mm unit 1,00
5.6.5.2 Bed Panel unit 1,00
5.6.5.3 Panel partisi divider unit 1,00

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.5.3 Bed Head, uk. 1900 x 2400 x 200 mm unit 1,00


5.6.5.4 Side Table; uk. 550 x 400 x 450 mm unit 2,00
5.6.5.5 Dressing Table, uk. 2100 x 550 x 80 mm unit 1,00
5.6.5.6 Cabinet Wardrobe, uk. 1200 x 2400 mm unit 1,00
5.6.5.7 Writing Chair unit 2,00
5.6.5.8 Single Sofa unit 1,00
5.6.5.9 Sofa 2 Seater unit 1,00
5.6.5.10 Round Table, uk. Dia 600 x 600 x 450 mm unit 1,00
5.6.5.11 Wall Lamp unit 2,00
5.6.5.12 Curtain unit 1,00
5.6.5.13 Kitchen Set unit 1,00
5.6.5.14 Dining Table unit 1,00
5.6.5.15 Accessories unit 2,00
5.6.5.16 Backsplash Kitchen ex Solid Surface Hanex unit 1,00

5.6.6 UNIT PENTHOUSE ROOM ( 3 unit )


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.6.1 Bed Panel unit 3,00


5.6.6.2 Backdrop Area TV unit 3,00

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.6.6.3 Bed Head, uk. 1800 x 1200 x 100 mm unit 3,00


5.6.6.4 Side Table; uk. 550 x 400 x 450 mm unit 6,00
5.6.6.5 Writing Table, uk. 2100 x 550 x 600 mm unit 3,00
5.6.6.6 Credenza TV unit 3,00
5.6.6.7 Cabinet Wardrobe, uk. 800 x 700 x 380 mm unit 3,00
5.6.6.8 Sofa 3 Seater unit 3,00
5.6.6.9 Single Sofa unit 3,00
5.6.6.10 Coffee Table unit 3,00
5.6.6.11 End Table; uk. 550 x 400 x 450 mm unit 6,00
5.6.6.12 End Bed Bench unit 3,00
5.6.6.13 Table Lamp unit 12,00
5.6.6.14 Curtain unit 6,00
5.6.6.15 Accessories unit 6,00

SUB TOTAL PEKERJAAN INTERIOR KAMAR HOTEL

5.6.1 UNIT DELUXE 1 ROOM ( 95 unit )


5.6.2 UNIT TWIN 2 ROOM ( 40 unit )
5.6.3 UNIT APARTMENT ROOM ( 8 unit )
5.6.4 UNIT JUNIOR SUITES ROOM ( 8 unit )
5.6.5 UNIT PRESIDENTIAL SUITES ROOM ( 1 unit )
5.6.6 UNIT PENTHOUSE ROOM ( 3 unit )

5.7 SUB PEKERJAAN INTERIOR LANTAI 14

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 106

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
5.7.1 DINNING ROOM
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.7.1.1 Dinning Table unit 1,00


5.7.1.2 Dinning Chair unit 10,00
5.7.1.3 Cabinet unit 1,00
5.7.1.4 Credenza unit 1,00
5.7.1.5 Bar Table unit 1,00
5.7.1.6 Bar Stool unit 3,00
5.7.1.7 Kitchen Set (tidak termasuk Kitchen appliances) unit 1,00
5.7.1.8 Backsplash Kitchen ex. Solid Surface Hanex unit 1,00

5.7.2 GUEST ROOM


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.7.2.1 Coffee Table unit 1,00


5.7.2.2 Sofa 1 Seater unit 2,00
5.7.2.3 Sofa 2 Seater unit 1,00
5.7.2.4 Sofa 3 Seater unit 1,00
5.7.2.5 Side Table unit 2,00
5.7.2.6 TV Cabinet unit 1,00
5.7.2.7 Backdrop Panel TV unit 1,00

5.7.3 MEETING ROOM


Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.7.3.1 Meeting Table unit 1,00


5.7.3.2 Meeting Chair unit 12,00
5.7.3.3 Meeting Cabinet unit 1,00
5.7.3.4 Small Pantry unit 1,00

5.7.4 WORKING ROOM


Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.7.4.1 Backdrop Panel unit 1,00

Pengadaan, pembuatan, perakitan, dan pemasangan loose


furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.7.4.2 Working Chair unit 3,00


5.7.4.3 Working Desk unit 1,00
5.7.4.4 Working Cabinet unit 1,00

5.7.5 CORRIDOR
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.7.5.1 Single Chair unit 6,00


5.7.5.2 Round Table unit 3,00
5.7.5.3 Toilet Cabinet unit 5,00

5.7.6 FINISHING CEILING

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN INTERIOR
DAFTAR URAIAN PEKERJAAN (BILL OF QUANTITY)
DAFTAR NO. 5 : PEKERJAAN INTERIOR
HALAMAN : 107

HARGA SATUAN (Rp)


HARGA
NO. URAIAN PEKERJAAN SAT VOL TOTAL (Rp)
UPAH MATERIAL
Pengadaan, pembuatan, perakitan, dan pemasangan fix
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.7.6.1 Fin. Ceiling m2 39,56

5.7.7 ACCESSORIES
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.7.7.1 Pendant Lamp unit 3,00


5.7.7.2 Standing Lamp unit 3,00
5.7.7.3 Table Lamp unit 4,00
5.7.7.4 Rugs unit 1,00
5.7.7.5 Curtain ls 1,00
5.7.7.6 Accessories ls 1,00

5.7.8 KITCHEN
Pengadaan, pembuatan, perakitan, dan pemasangan loose
furniture berikut, lengkap dengan penyelesaiannya, hardware
dan semua peralatan pemasangan.

5.7.8.1 Kitchen Set (Tidak termasuk Kitchen Appliance) set 1,00


5.7.8.2 Backsplash Kitchen ex. Solid Surface Hanex unit 1,00

SUB TOTAL PEKERJAAN INTERIOR LANTAI 14

5.7.1 DINNING ROOM


5.7.2 GUEST ROOM
5.7.3 MEETING ROOM
5.7.4 WORKING ROOM
5.7.5 CORRIDOR
5.7.6 FINISHING CEILING
5.7.7 ACCESSORIES
5.7.8 KITCHEN

REKAPITULASI TOTAL PENJUMLAHAN SUB PEKERJAAN INTERIOR

5.1 SUB TOTAL PEKERJAAN INTERIOR LANTAI BASEMENT

5.2 SUB TOTAL PEKERJAAN INTERIOR LANTAI 1

5.3 SUB TOTAL PEKERJAAN INTERIOR LANTAI 2

5.4 SUB TOTAL PEKERJAAN INTERIOR LANTAI 3

5.5 SUB TOTAL PEKERJAAN INTERIOR LOBBY LIFT (LT.1-14) & KORIDOR (LT. 4-14)

5.6 SUB TOTAL PEKERJAAN INTERIOR KAMAR HOTEL

5.7 SUB TOTAL PEKERJAAN INTERIOR LANTAI 14

PROYEK : D ANAYA HOTEL KARAWANG - JAWA BARAT


PAKET : PEKERJAAN INTERIOR