Anda di halaman 1dari 51

PEKERJAAN : PEKERJAAN BANGUNAN GEDUNG A

PROYEK : PEMBANGUNAN RS DI SURABAYA

NO. URAIAN PEKERJAAN NILAI TOTAL

- PEKERJAAN STANDAR Rp 31,599,082,468.08

- PEKERJAAN NON STANDAR Rp 20,473,795,373.46

TOTAL Rp 52,072,877,841.54
PPN 10 %

Rekapitulasi Gedung D
PEKERJAAN : PEKERJAAN BANGUNAN GEDUNG A
PROYEK : PEMBANGUNAN RS DI SURABAYA

NO. URAIAN PEKERJAAN NILAI TOTAL

- PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN Rp 250,618,344.52


TOTAL PEKERJAAN PERSIAPAN Rp 250,618,344.52

II. PEKERJAAN STRUKTUR


2.1. PEKERJAAN TANAH Rp 533,402,295.74
2.2. PEKERJAAN PONDASI, PILE CAP DAN SLOOF Rp 2,181,289,307.37
2.3. PEKERJAAN STRUKTUR ATAS
A LANTAI BASEMENT ( EL. - 3.00 M ) Rp 1,583,828,455.61
B LANTAI DASAR ( EL. - 0,05 M ) Rp 2,290,076,963.50
C LANTAI SATU ( EL. + 4,95 M ) Rp 2,150,608,133.80
D LANTAI DUA ( EL. + 8,95 M ) Rp 2,100,270,689.12
E LANTAI TIGA ( EL. + 12,95 M ) Rp 2,089,726,645.23
F LANTAI EMPAT ( EL. + 16,95 M ) Rp 2,063,170,745.06
G LANTAI LIMA ( EL. + 20,95 M ) Rp 637,597,282.69
TOTAL PEKERJAAN STRUKTUR Rp 15,629,970,518.12

III. PEKERJAAN ARSITEK


3.1. PEKERJAAN PENGADAAN, PEMASANGAN DINDING DAN PELAPIS DINDING Rp 3,440,732,507.53
3.2. PEKERJAAN PENGADAAN & PEMASANGAN LANTAI Rp 1,869,572,732.10
3.3. PEKERJAAN PENGADAAN & PEMASANGAN PLAFOND Rp 902,906,645.92
3.4. PEKERJAAN PENGADAAN, PEMASANGAN PINTU DAN JENDELA Rp 4,844,116,797.70
3.5. PEKERJAAN PENGADAAN & PEMASANGAN SANITAIR Rp 870,996,572.00
3.6. PEKERJAAN PENGECATAN Rp 389,060,503.31
3.7. PEKERJAAN PENGADAAN & PEMASANGAN RAILLING Rp 148,882,446.88
TOTAL PEKERJAAN ARSITEK Rp 12,466,268,205.44

IV. PEKERJAAN PLUMBING


4.1. PEKERJAAN AIR BERSIH Rp 86,067,600.00
4.2. PEKERJAAN AIR RECYCLING Rp 61,460,000.00
4.3. PEKERJAAN AIR PANAS Rp 123,003,700.00
4.4. PEKERJAAN AIR KOTOR Rp 515,040,800.00
4.5. PEKERJAAN TALANG AIR HUJAN Rp 69,874,000.00
4.6. PEKERJAAN PIPA AIR BUANGAN DAPUR Rp 85,834,100.00
4.7. PEKERJAAN PIPA AIR BUANGAN LAB Rp 80,834,100.00
SUB TOTAL PEKERJAAN PLUMBING Rp 1,022,114,300.00

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1. PEKERJAAN PANEL DAN KABEL FEEDER Rp 656,697,900.00
5.2. PEKERJAAN TITIK INSTALASI DAYA DAN ARMATUR PENERANGAN Rp 1,573,413,200.00
SUB TOTAL PEKERJAAN ELEKTRIKAL ARUS KUAT Rp 2,230,111,100.00
TOTAL PEKERJAAN ME

TOTAL PEKERJAAN STANDAR GEDUNG A Rp 31,599,082,468.08

Rekapitulasi Gedung D
PEKERJAAN : PEKERJAAN BANGUNAN GEDUNG A
PROYEK : PEMBANGUNAN RS DI SURABAYA

NO. URAIAN PEKERJAAN NILAI TOTAL

- PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1. PEKERJAAN PONDASI TIANG PANCANG Rp 3,113,785,486.00
1.2. DINDING BETON RETAINING WALL RW Rp 328,267,045.43
TOTAL PEKERJAAN STRUKTUR Rp 3,442,052,531.43

II. PEKERJAAN ARSITEK


2.1. PEKERJAAN PENGADAAN & PEMASANGAN PELAPIS DINDING Rp 1,840,191,422.79
2.2. PEKERJAAN FASADE Rp 2,468,609,159.24
TOTAL PEKERJAAN ARSITEK Rp 4,308,800,582.03

III. PEKERJAAN PEMADAMAN KEBAKARAN Rp 778,533,100.00


SUB TOTAL PEKERJAAN PEMADAMAN KEBAKARAN Rp 778,533,100.00

IV. PEKERJAAN INSTALASI GAS MEDIS Rp 1,059,406,200.00


SUB TOTAL PEKERJAAN INSTALASI GAS MEDIS Rp 1,059,406,200.00

V. PEKERJAAN TATA UDARA DAN EXHAUST FAN


5.1. PEKERJAAN TATA UDARA ( VRV SYSTEM ) Rp 4,126,306,700.00
5.2. PEKERJAAN EXHAUST FAN Rp 416,889,000.00
SUB TOTAL PEKERJAAN TATA UDARA DAN EXHAUST FAN Rp 4,543,195,700.00

VI. PEKERJAAN TRANSPORTASI VERTIKAL DALAM GEDUNG Rp 346,793,200.00


PNEUMATIC TUBE SYSTEM (SISTEM TRANSPORTASI TABUNG )
SUB TOTAL PEKERJAAN TRANSPORTASI VERTIKAL DALAM GEDUNG Rp 346,793,200.00

VII. PEKERJAAN LIFT Rp 1,475,341,400.00


SUB TOTAL PEKERJAAN LIFT Rp 1,475,341,400.00

VIII PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1. PEKERJAAN RAK KABEL Rp 463,217,900.00
5.2. PEKERJAAN PENANGKAL PETIR & GROUNDING SISTEM Rp 106,250,600.00
SUB TOTAL PEKERJAAN ELEKTRIKAL ARUS KUAT Rp 569,468,500.00

IX. PEKERJAAN ELEKTRIKAL ARUS LEMAH


6.1. PEKERJAAN TELEPHONE Rp 226,734,600.00
6.2. PEKERJAAN DATA DAN ACCEES POINT Rp 1,540,801,000.00
6.3. PEKERJAAN CCTV Rp 365,936,900.00
6.4. PEKERJAAN TATA SUARA Rp 458,296,500.00
6.5. PEKERJAAN FIRE ALARM Rp 504,682,200.00
6.6. PEKERJAAN SISTEM MATV Rp 41,076,400.00
SUB TOTAL PEKERJAAN ELEKTRIKAL ARUS LEMAH Rp 3,137,527,600.00

X PEKERJAAN NURSE CALL Rp 538,546,560.00


SUB TOTAL PEKERJAAN NURSE CALL Rp 538,546,560.00

XI PEKERJAAN RAK KABEL ELEKTRONIKA Rp 274,130,000.00


SUB TOTAL PEKERJAAN RAK KABEL ELEKTRONIKA Rp 274,130,000.00

TOTAL PEKERJAAN ME

TOTAL PEKERJAAN NON STANDAR GEDUNG A Rp 20,473,795,373.46

Rekapitulasi Gedung D
PEKERJAAN : PERSIAPAN
PROYEK : PEMBANGUNAN RS DI SURABAYA

DAFTAR - A : PEKERJAAN PERSIAPAN

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT VOL
(Rp.) (Rp.)

I. I. PEKERJAAN PERSIAPAN
1. Sewa Pagar sementara dari seng gelombang tinggi 2 meter m 400.48 195,274.00 78,203,331.52
2. Pekerjaan Papan Nama Proyek unit 1.00 1,263,535.00 1,263,535.00
3. Pekerjaan Kantor Sementara (Direksikeet) m 80.00 603,051.00 48,244,080.00
4. Pekerjaan Air Kerja ls 1.00 8,040,678.00 8,040,678.00
5. Pekerjaan Listrik Kerja ls 1.00 36,757,385.00 36,757,385.00
7. Mobilisasi dan Demobilisasi Alat Pancang Dropp Hummer ls 1.00 63,176,755.00 63,176,755.00
31,588,377.50 235,685,764.52
Total Pekerjaan Persiapan 23,568,576.45
259,254,340.97

Pek. Persiapan - page 4 of 51


PEKERJAAN : PEKERJAAN BANGUNAN GEDUNG A
PROYEK : PEMBANGUNAN RS DI SURABAYA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SAT VOL
(Rp.) (Rp.)

PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank m' 260.00 57,433.00 14,932,580.00
SUB TOTAL PEKERJAAN PERSIAPAN 14,932,580.00

II. PEKERJAAN STRUKTUR


2.1. PEKERJAAN TANAH
1 Galian Tanah m3 9,230.85 9,189.00 84,822,280.65
2 Buang Tanah Ex. Galian Tanah Didalam Site Proyek m3 5,854.79 17,230.00 100,878,031.70
3 Pemadatan Tanah CBR 4 + test m2 - 5,743.00 -
4 Urugan Tanah Bekas Galian m3 3,376.05 22,973.00 77,557,996.65
5 Pasir Urug Bawah Pondasi dan Lantai t.10 cm m3 370.00 244,806.00 90,578,220.00
6 Lantai Kerja Bawah Pondasi dan Lantai t.5 cm m3 246.66 727,989.00 179,565,766.74
SUB TOTAL PEKERJAAN TANAH 533,402,295.74
`
2.2. PEKERJAAN PONDASI, PILE CAP DAN SLOOF
1 PILE CAP TYPE P-4 2,40x2,40x1,20 - 2 unit
- Besi D 22 kg 1,326.03 10,636.00 14,103,655.08
- Besi D 19 kg 588.83 10,636.00 6,262,795.88
- Besi D 13 tulangan samping kg 38.99 10,636.00 414,697.64
- Begisting Batako m2 23.04 95,000.00 2,188,800.00
- Cor Beton K-350 m3 13.82 893,475.00 12,347,824.50
- Waterproofing Integral liter 69.12 25,845.00 1,786,406.40
2 PILE CAP TYPE P-6 2,50x3,80x1,20 - 2 unit -
- Besi D 22 kg 1,978.90 10,636.00 21,047,580.40
- Besi D 19 kg 945.54 10,636.00 10,056,763.44
- Besi D 13 tulangan samping kg 51.49 10,636.00 547,647.64
- Begisting Batako m2 30.24 95,000.00 2,872,800.00
- Cor Beton K-350 m3 22.80 893,475.00 20,371,230.00
- Waterproofing Integral liter 114.00 25,845.00 2,946,330.00
3 PILE CAP TYPE P-9 3,80x3,80x1,20 - 12 unit -
- Besi D 22 kg 16,555.05 10,636.00 176,079,511.80
- Besi D 19 kg 8,435.50 10,636.00 89,719,978.00
- Besi D 13 tulangan samping kg 373.98 10,636.00 3,977,651.28
- Begisting Batako m2 218.88 95,000.00 20,793,600.00
- Cor Beton K-350 m3 207.94 893,475.00 185,789,191.50
- Waterproofing Integral liter 1,039.68 25,845.00 26,870,529.60
4 PILE CAP TYPE P-9A 4,20x4,20x1,20 - 16 unit -
- Besi D 22 kg 25,930.94 10,636.00 275,801,477.84
- Besi D 19 kg 13,627.72 10,636.00 144,944,429.92
- Besi D 13 tulangan samping kg 551.98 10,636.00 5,870,859.28
- Begisting Batako m2 322.56 95,000.00 30,643,200.00
- Cor Beton K-350 m3 338.69 893,475.00 302,611,047.75
- Waterproofing Integral liter 1,693.44 25,845.00 43,766,956.80
6 PILE CAP TYPE P-12A 3.80x5,40x1,20 - 2 unit -
- Besi D 22 kg 3,713.12 10,636.00 39,492,744.32
- Besi D 19 kg 1,972.53 10,636.00 20,979,829.08
- Besi D 13 tulangan samping kg 75.67 10,636.00 804,826.12
- Begisting Batako m2 44.16 95,000.00 4,195,200.00
- Cor Beton K-350 m3 49.25 893,475.00 44,003,643.75
- Waterproofing Integral liter 98.50 25,845.00 2,545,732.50
7 PILE CAP TYPE P-27 3,80x11,60x1,20 - 1 unit -
- Besi D 22 kg 3,720.43 10,636.00 39,570,493.48
- Besi D 19 kg 2,084.07 10,636.00 22,166,168.52
- Besi D 13 tulangan samping kg 63.67 10,636.00 677,194.12
- Begisting Batako m2 36.96 95,000.00 3,511,200.00
- Cor Beton K-350 m3 52.90 893,475.00 47,264,827.50
- Waterproofing Integral liter 264.48 25,845.00 6,835,485.60
8 SLOOF TB1 40/70 -
- Besi D 22 kg 15,245.04 10,636.00 162,146,245.44
- Besi D 13 kg 1,570.59 10,636.00 16,704,795.24
- Besi Ø 10 kg 5,464.09 10,636.00 58,116,061.24
- Begisting Batako m2 308.95 95,000.00 29,350,250.00
- Cor Beton K-350 m3 61.79 893,475.00 55,207,820.25
- Waterproofing Integral liter 123.58 25,845.00 3,193,925.10
10 SLOOF TB2 30/50 -
- Besi D 22 kg 9,813.00 10,636.00 104,371,068.00
- Besi D 13 kg 808.02 10,636.00 8,594,100.72
- Besi Ø 10 kg 3,328.75 10,636.00 35,404,585.00
- Begisting Batako m2 204.30 95,000.00 19,408,500.00
- Cor Beton K-350 m3 30.65 893,475.00 27,385,008.75
- Waterproofing Integral liter 61.29 25,845.00 1,584,040.05
12 SLOOF TB3 25/45 -
- Besi D 22 kg 262.16 10,636.00 2,788,333.76
- Besi Ø 10 kg 75.23 10,636.00 800,146.28
- Begisting Batako m2 6.03 95,000.00 572,850.00

Pek. Standart Gedung D - page 5 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

- Cor Beton K-350 m3 0.75 893,475.00 670,106.25


- Waterproofing Integral liter 1.51 25,845.00 39,025.95
1 SLOOF TB2 30/50 ( ELEV. - 5,150 ) -
- Besi D 22 kg 422.46 10,636.00 4,493,284.56
- Besi D 13 kg 31.88 10,636.00 339,075.68
- Besi Ø 10 kg 142.87 10,636.00 1,519,565.32
- Begisting Batako m2 8.22 95,000.00 780,900.00
- Cor Beton K-350 m3 1.23 893,475.00 1,098,974.25
- Waterproofing Integral liter 2.47 25,845.00 63,837.15
2 SLOOF TB1 40/70 ( ELEV. - 0.050 ) -
- Besi D 22 kg 636.96 10,636.00 6,774,706.56
- Besi D 13 kg 64.14 10,636.00 682,193.04
- Besi Ø 10 kg 207.05 10,636.00 2,202,183.80
- Begisting Batako m2 7.50 95,000.00 712,500.00
- Cor Beton K-350 m3 1.50 893,475.00 1,340,212.50
- Waterproofing Integral liter 3.00 25,845.00 77,535.00
13 SLOOF TB3 25/45 ( ELEV. - 5,150 ) -
- Besi D 22 kg 56.37 10,636.00 599,551.32
- Besi Ø 10 kg 15.87 10,636.00 168,793.32
- Begisting Batako m2 1.10 95,000.00 104,500.00
- Cor Beton K-350 m3 0.14 893,475.00 125,086.50
- Waterproofing Integral liter 0.28 25,845.00 7,236.60

SUB TOTAL PEKERJAAN PONDASI, PILE CAP DAN SLOOF 2,181,289,307.37

2.3. PEKERJAAN STRUKTUR ATAS

A LANTAI BASEMENT ( EL. - 3.00 M )


1 PLAT LANTAI BASEMENT SB (t=20 cm)
- Besi D 13 (Double Layer) kg 37,672.68 10,636.00 400,686,624.48
- Begisting m2 100.39 105,000.00 10,540,950.00
- Cor Beton K-350 m3 261.00 893,475.00 233,196,975.00
- Waterproofing Integral liter 522.00 25,845.00 13,491,090.00
1 KOLOM TYPE K2 (65x65) - 12 UNIT -
- Besi D 22 kg 7,262.10 10,636.00 77,239,695.60
- Besi D 13 kg 4,432.28 10,636.00 47,141,730.08
- Begisting Multipleks m2 148.72 105,000.00 15,615,600.00
- Cor Beton K-350 m3 24.17 893,475.00 21,595,290.75
2 KOLOM TYPE K4 (65x65) - 28 UNIT -
- Besi D 22 kg 16,555.18 10,636.00 176,080,894.48
- Besi D 13 kg 10,083.45 10,636.00 107,247,574.20
- Begisting Multipleks m2 334.88 105,000.00 35,162,400.00
- Cor Beton K-350 m3 54.42 893,475.00 48,622,909.50
3 KOLOM TYPE K6 (45x80) - 12 UNIT -
- Besi D 22 kg 6,081.50 10,636.00 64,682,834.00
- Besi D 13 kg 3,460.43 10,636.00 36,805,133.48
- Begisting Multipleks m2 138.00 105,000.00 14,490,000.00
- Cor Beton K-350 m3 19.87 893,475.00 17,753,348.25
5 KOLOM TYPE K13 (L 25x50) - 5 UNIT -
- Besi D 19 kg 1,327.62 10,636.00 14,120,566.32
- Besi D 10 kg 366.28 10,636.00 3,895,754.08
- Begisting Multipleks m2 38.25 105,000.00 4,016,250.00
- Cor Beton K-350 m3 4.78 893,475.00 4,270,810.50
6 KOLOM TYPE K14 (T 50x75) - 1 UNIT -
- Besi D 19 kg 331.91 10,636.00 3,530,194.76
- Besi D 10 kg 84.97 10,636.00 903,740.92
- Begisting Multipleks m2 10.20 105,000.00 1,071,000.00
- Cor Beton K-350 m3 1.28 893,475.00 1,143,648.00
7 KOLOM TYPE K15 (25x25) - 6 UNIT -
- Besi D 19 kg 760.98 10,636.00 8,093,783.28
- Besi D 10 kg 183.29 10,636.00 1,949,472.44
- Begisting Multipleks m2 28.60 105,000.00 3,003,000.00
- Cor Beton K-350 m3 1.79 893,475.00 1,599,320.25
8 TANGGA ( 2 UNIT ) -
- Besi D 13 kg 327.20 10,636.00 3,480,099.20
- Besi Ø 10 kg 222.57 10,636.00 2,367,254.52
- Besi Trap Ø10 kg 124.85 10,636.00 1,327,904.60
- Begisting Multipleks m2 169.98 165,000.00 28,046,700.00
- Cor Beton K-350 m3 8.24 893,475.00 7,362,234.00
9 STEK DINDING BETON SEAR WALL SW -
- Besi D 19 kg 10,636.00 -
10 DINDING BETON PITLIFT SW -
- Besi D 16 kg 1,440.50 10,636.00 15,321,158.00
- Begisting kg 159.62 105,000.00 16,760,100.00
- Cor Beton K-350 m2 16.53 893,475.00 14,769,141.75
11 LANTAI BETON PITLIFT SB -
- Besi D 16 kg 820.82 10,636.00 8,730,241.52
- Begisting kg 6.86 105,000.00 720,300.00
- Cor Beton K-350 m2 1.67 893,475.00 1,492,103.25
13 BALOK TANGGA TYPE BT (25x50) -
- Besi D 22 kg 148.53 10,636.00 1,579,765.08

Pek. Standart Gedung D - page 6 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

- Besi D 13 kg 13.54 10,636.00 144,011.44


- Besi Ø 10 kg 42.30 10,636.00 449,902.80
- Begisting Multipleks m2 5.80 165,000.00 957,000.00
- Cor Beton K-350 m3 0.53 893,475.00 473,541.75
14 PIPA SUBDRAIN TERPASANG -
- Pipa subdrain lengkap ijuk dan kawat nyamuk m1 152.00 315,884.00 48,014,368.00
15 WATERSTOP TERPASANG -
- Waterstop m1 155.38 87,873.00 13,653,706.74
16 BAK SUMPIT (t=15 cm) -
- Besi Ø 10 kg 1,392.69 10,636.00 14,812,650.84
- Begisting m2 193.23 105,000.00 20,289,150.00
- Cor Beton K-350 m3 16.93 893,475.00 15,126,531.75
SUB TOTAL PEKERJAAN STRUKTUR ATAS 1,583,828,455.61

B LANTAI DASAR ( EL. - 0,05 M )


1 SLOOF TB1 40/70 ( ELEV. - 0.050 )
- Besi D 22 kg 962.04 10,636.00 10,232,257.44
- Besi D 13 kg 96.48 10,636.00 1,026,161.28
- Besi Ø 10 kg 232.93 10,636.00 2,477,443.48
- Begisting Batako m2 24.45 95,000.00 2,322,750.00
- Cor Beton K-350 m3 4.89 893,475.00 4,369,092.75
- Waterproofing Integral liter 9.78 25,845.00 252,764.10
2 SLOOF TB2 30/50 -
- Besi D 22 kg 426.62 10,636.00 4,537,530.32
- Besi D 13 kg 31.99 10,636.00 340,245.64
- Besi Ø 10 kg 113.88 10,636.00 1,211,227.68
- Begisting Batako m2 10.66 95,000.00 1,012,700.00
- Cor Beton K-350 m3 1.60 893,475.00 1,429,560.00
- Waterproofing Integral liter 3.20 25,845.00 82,704.00
1 BALOK TYPE B1 (40x75) -
- Besi D 22 kg 24,758.11 10,636.00 263,327,257.96
- Besi D 13 kg 2,538.23 10,636.00 26,996,614.28
- Besi D 13 (Sengkang) kg 17,151.66 10,636.00 182,425,055.76
- Begisting Multipleks m2 877.61 105,000.00 92,149,050.00
- Cor Beton K-350 m3 132.71 893,475.00 118,573,067.25
2 BALOK TYPE BA (30x55) -
- Besi D 22 kg 10,649.35 10,636.00 113,266,486.60
- Besi D 13 kg 772.99 10,636.00 8,221,521.64
- Besi D 10 kg 2,458.74 10,636.00 26,151,158.64
- Begisting Multipleks m2 400.85 105,000.00 42,089,250.00
- Cor Beton K-350 m3 44.30 893,475.00 39,580,942.50
3 BALOK TYPE BA1 (25x45) -
- Besi D 19 kg 1,853.42 10,636.00 19,712,975.12
- Besi D 13 kg 241.44 10,636.00 2,567,955.84
- Besi Ø 10 kg 610.80 10,636.00 6,496,468.80
- Begisting Multipleks m2 95.50 105,000.00 10,027,500.00
- Cor Beton K-350 m3 8.58 893,475.00 7,666,015.50
4 BALOK TYPE BA2 (20x35) -
- Besi D 16 kg 417.65 10,636.00 4,442,125.40
- Besi Ø 10 kg 159.17 10,636.00 1,692,932.12
- Begisting Multipleks m2 16.59 105,000.00 1,741,950.00
- Cor Beton K-350 m3 1.14 893,475.00 1,018,561.50
5 PLAT LANTAI DASAR S1 (t=13 cm) -
- Besi D 10 (Double Layer) kg 21,720.70 10,636.00 231,021,365.20
- Begisting kg 1,664.50 105,000.00 174,772,500.00
- Cor Beton K-350 kg 216.39 893,475.00 193,339,055.25
6 PLAT LANTAI DASAR SD (t=15 cm) -
- Besi D 10 (Double Layer) kg 131.03 10,636.00 1,393,635.08
- Begisting kg 49.70 105,000.00 5,218,500.00
- Cor Beton K-350 kg 7.46 893,475.00 6,665,323.50
7 TANGGA ( 2 UNIT ) -
- Besi D 13 kg 330.02 10,636.00 3,510,092.72
- Besi Ø 10 kg 224.26 10,636.00 2,385,229.36
- Besi Trap Ø10 kg 124.88 10,636.00 1,328,223.68
- Begisting Multipleks m2 173.85 165,000.00 28,685,250.00
- Cor Beton K-350 m3 8.64 893,475.00 7,719,624.00
1 KOLOM TYPE K2 (65x65) - 12 UNIT -
- Besi D 22 kg 5,892.52 10,636.00 62,672,842.72
- Besi D 13 kg 3,490.42 10,636.00 37,124,107.12
- Begisting Multipleks m2 156.00 105,000.00 16,380,000.00
- Cor Beton K-350 m3 25.35 893,475.00 22,649,591.25
8 KOLOM TYPE K4 (65x65) - 28 UNIT -
- Besi D 22 kg 13,749.22 10,636.00 146,236,703.92
- Besi D 13 kg 8,144.32 10,636.00 86,622,987.52
- Begisting Multipleks m2 364.00 105,000.00 38,220,000.00
- Cor Beton K-350 m3 59.15 893,475.00 52,849,046.25
9 KOLOM TYPE K6 (45x80) - 12 UNIT -
- Besi D 22 kg 5,050.73 10,636.00 53,719,564.28
- Besi D 13 kg 2,794.96 10,636.00 29,727,194.56
- Begisting Multipleks m2 150.00 105,000.00 15,750,000.00
- Cor Beton K-350 m3 21.60 893,475.00 19,299,060.00

Pek. Standart Gedung D - page 7 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

10 KOLOM TYPE K13 (L 25x50) - 5 UNIT -


- Besi D 19 kg 1,025.08 10,636.00 10,902,750.88
- Besi D 10 kg 357.78 10,636.00 3,805,348.08
- Begisting Multipleks m2 37.50 105,000.00 3,937,500.00
- Cor Beton K-350 m3 4.69 893,475.00 4,190,397.75
11 KOLOM TYPE K14 (T 50x75) - 1 UNIT -
- Besi D 19 kg 256.27 10,636.00 2,725,687.72
- Besi D 10 kg 130.58 10,636.00 1,388,827.61
- Begisting Multipleks m2 7.50 105,000.00 787,500.00
- Cor Beton K-350 m3 1.25 893,475.00 1,116,843.75
12 KOLOM TYPE K15 (25x25) - 6 UNIT -
- Besi D 19 kg 615.05 10,636.00 6,541,671.80
- Besi D 10 kg 167.56 10,636.00 1,782,168.16
- Begisting Multipleks m2 30.00 105,000.00 3,150,000.00
- Cor Beton K-350 m3 1.88 893,475.00 1,679,733.00
13 KOLOM TYPE K17 (65x65) - 2 UNIT -
- Besi D 22 kg 343.59 10,636.00 3,654,423.24
- Besi D 13 kg 326.88 10,636.00 3,476,695.68
- Begisting Multipleks m2 10.40 105,000.00 1,092,000.00
- Cor Beton K-350 m3 1.69 893,475.00 1,509,972.75
14 BALOK TANGGA TYPE BT (25x50) -
- Besi D 22 kg 148.53 10,636.00 1,579,765.08
- Besi D 13 kg 13.54 10,636.00 144,011.44
- Besi Ø 10 kg 42.30 10,636.00 449,902.80
- Begisting Multipleks m2 5.80 165,000.00 957,000.00
- Cor Beton K-350 m3 0.53 893,475.00 473,541.75
SUB TOTAL LANTAI DASAR ( EL. - 0,05 M ) 2,290,076,963.50

C LANTAI SATU ( EL. + 4,95 M )


1 BALOK TYPE B1 (40x75)
- Besi D 22 kg 25,960.73 10,636.00 276,118,324.28
- Besi D 13 kg 2,658.12 10,636.00 28,271,764.32
- Besi D 13 (Sengkang) kg 18,231.41 10,636.00 193,909,276.76
- Begisting Multipleks m2 910.73 105,000.00 95,626,650.00
- Cor Beton K-350 m3 137.72 893,475.00 123,049,377.00
2 BALOK TYPE BA (30x55) -
- Besi D 22 kg 9,679.74 10,636.00 102,953,714.64
- Besi D 13 kg 1,165.56 10,636.00 12,396,896.16
- Besi D 10 kg 2,316.39 10,636.00 24,637,124.04
- Begisting Multipleks m2 416.64 105,000.00 43,747,200.00
- Cor Beton K-350 m3 46.05 893,475.00 41,144,523.75
3 BALOK TYPE BA1 (25x45) -
- Besi D 19 kg 2,037.54 10,636.00 21,671,275.44
- Besi D 13 kg 290.09 10,636.00 3,085,397.24
- Besi Ø 10 kg 650.73 10,636.00 6,921,164.28
- Begisting Multipleks m2 110.63 105,000.00 11,616,150.00
- Cor Beton K-350 m3 1.36 893,475.00 1,215,126.00
4 BALOK TYPE BA2 (20x35) -
- Besi D 16 kg 490.01 10,636.00 5,211,746.36
- Besi Ø 10 kg 181.91 10,636.00 1,934,794.76
- Begisting Multipleks m2 19.73 105,000.00 2,071,650.00
- Cor Beton K-350 m3 1.36 893,475.00 1,215,126.00
5 PLAT LANTAI SATU S1 (t=13 cm) -
- Besi D 10 (Double Layer) kg 21,554.15 10,636.00 229,249,939.40
- Begisting m2 1,654.10 105,000.00 173,680,500.00
- Cor Beton K-350 m3 215.03 893,475.00 192,123,929.25
6 PLAT LANTAI SATU SA (t=12 cm) -
- Besi D 10 (Double Layer) kg 696.00 10,636.00 7,402,656.00
- Begisting m2 49.70 105,000.00 5,218,500.00
- Cor Beton K-350 m3 5.96 893,475.00 5,325,111.00
- Water Profing Bithuthene Sheet 3000 m2 49.70 91,747.00 4,559,825.90
- Pasangan screed lengkap kawat ayam m2 49.70 45,000.00 2,236,500.00
7 TANGGA ( 2 UNIT ) -
- Besi D 13 kg 300.49 10,636.00 3,196,011.64
- Besi Ø 10 kg 197.24 10,636.00 2,097,844.64
- Besi Trap Ø10 kg 106.81 10,636.00 1,136,031.16
- Begisting Multipleks m2 146.60 165,000.00 24,189,000.00
- Cor Beton K-350 m3 7.24 893,475.00 6,468,759.00
1 KOLOM TYPE K2 (65x65) - 12 UNIT -
- Besi D 22 kg 4,890.39 10,636.00 52,014,188.04
- Besi D 13 kg 2,958.55 10,636.00 31,467,137.80
- Begisting Multipleks m2 124.80 105,000.00 13,104,000.00
- Cor Beton K-350 m3 20.28 893,475.00 18,119,673.00
8 KOLOM TYPE K4 (65x65) - 28 UNIT -
- Besi D 22 kg 9,780.79 10,636.00 104,028,482.44
- Besi D 13 kg 6,903.28 10,636.00 73,423,286.08
- Begisting Multipleks m2 291.20 105,000.00 30,576,000.00
- Cor Beton K-350 m3 47.32 893,475.00 42,279,237.00
9 KOLOM TYPE K6 (45x80) - 12 UNIT -
- Besi D 22 kg 3,842.45 10,636.00 40,868,298.20
- Besi D 13 kg 2,369.06 10,636.00 25,197,322.16

Pek. Standart Gedung D - page 8 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

- Begisting Multipleks m2 120.00 105,000.00 12,600,000.00


- Cor Beton K-350 m3 17.28 893,475.00 15,439,248.00
10 KOLOM TYPE K13 (L 25x50) - 5 UNIT -
- Besi D 19 kg 847.12 10,636.00 9,009,968.32
- Besi D 10 kg 306.02 10,636.00 3,254,828.72
- Begisting Multipleks m2 30.00 105,000.00 3,150,000.00
- Cor Beton K-350 m3 3.75 893,475.00 3,350,531.25
11 KOLOM TYPE K14 (T 50x75) - 1 UNIT -
- Besi D 19 kg 211.78 10,636.00 2,252,492.08
- Besi D 10 kg 108.48 10,636.00 1,153,793.28
- Begisting Multipleks m2 6.00 105,000.00 630,000.00
- Cor Beton K-350 m3 1.00 893,475.00 893,475.00
12 KOLOM TYPE K15 (25x25) - 6 UNIT -
- Besi D 19 kg 508.27 10,636.00 5,405,959.72
- Besi D 10 kg 149.67 10,636.00 1,591,890.12
- Begisting Multipleks m2 24.00 105,000.00 2,520,000.00
- Cor Beton K-350 m3 1.50 893,475.00 1,340,212.50
13 BALOK TANGGA TYPE BT (25x50) -
- Besi D 22 kg 148.53 10,636.00 1,579,765.08
- Besi D 13 kg 13.54 10,636.00 144,011.44
- Besi Ø 10 kg 42.30 10,636.00 449,902.80
- Begisting Multipleks m2 5.80 105,000.00 609,000.00
- Cor Beton K-350 m3 0.53 893,475.00 473,541.75
SUB TOTAL LANTAI SATU ( EL. + 4,95 M ) 2,150,608,133.80

D LANTAI DUA ( EL. + 8,95 M )


1 BALOK TYPE B1 (40x75)
- Besi D 22 kg 25,779.88 10,636.00 274,194,803.68
- Besi D 13 kg 2,827.74 10,636.00 30,075,842.64
- Besi D 13 (Sengkang) kg 17,023.75 10,636.00 181,064,605.00
- Begisting Multipleks m2 881.50 105,000.00 92,557,500.00
- Cor Beton K-350 m3 133.30 893,475.00 119,100,217.50
2 BALOK TYPE BA (30x55) -
- Besi D 22 kg 9,879.81 10,636.00 105,081,659.16
- Besi D 13 kg 826.35 10,636.00 8,789,058.60
- Besi D 10 kg 2,015.43 10,636.00 21,436,113.48
- Begisting Multipleks m2 403.79 105,000.00 42,397,950.00
- Cor Beton K-350 m3 44.63 893,475.00 39,875,789.25
3 BALOK TYPE BA1 (25x45) -
- Besi D 19 kg 1,715.28 10,636.00 18,243,718.08
- Besi D 13 kg 238.34 10,636.00 2,534,984.24
- Besi Ø 10 kg 554.60 10,636.00 5,898,725.60
- Begisting Multipleks m2 92.33 105,000.00 9,694,650.00
- Cor Beton K-350 m3 8.30 893,475.00 7,415,842.50
4 BALOK TYPE BA2 (20x35) -
- Besi D 16 kg 1,260.34 10,636.00 13,404,976.24
- Besi Ø 10 kg 468.08 10,636.00 4,978,498.88
- Begisting Multipleks m2 60.16 105,000.00 6,316,800.00
- Cor Beton K-350 m3 4.14 893,475.00 3,698,986.50
5 PLAT LANTAI DUA S1 (t=13 cm) -
- Besi D 10 (Double Layer) kg 20,817.69 10,636.00 221,416,950.84
- Begisting m2 1,656.10 105,000.00 173,890,500.00
- Cor Beton K-350 m3 215.29 893,475.00 192,356,232.75
6 TANGGA ( 2 UNIT ) -
- Besi D 13 kg 300.49 10,636.00 3,196,011.64
- Besi Ø 10 kg 197.24 10,636.00 2,097,844.64
- Besi Trap Ø10 kg 106.81 10,636.00 1,136,031.16
- Begisting Multipleks m2 146.60 165,000.00 24,189,000.00
- Cor Beton K-350 m3 7.24 893,475.00 6,468,759.00
1 KOLOM TYPE K2 (65x65) - 12 UNIT -
- Besi D 22 kg 4,191.77 10,636.00 44,583,665.72
- Besi D 13 kg 2,958.55 10,636.00 31,467,137.80
- Begisting Multipleks m2 124.80 105,000.00 13,104,000.00
- Cor Beton K-350 m3 20.28 893,475.00 18,119,673.00
7 KOLOM TYPE K4 (65x65) - 28 UNIT -
- Besi D 22 kg 9,780.79 10,636.00 104,028,482.44
- Besi D 13 kg 6,903.28 10,636.00 73,423,286.08
- Begisting Multipleks m2 291.20 105,000.00 30,576,000.00
- Cor Beton K-350 m3 47.32 893,475.00 42,279,237.00
8 KOLOM TYPE K6 (45x80) - 12 UNIT -
- Besi D 22 kg 3,842.45 10,636.00 40,868,298.20
- Besi D 13 kg 2,369.06 10,636.00 25,197,322.16
- Begisting Multipleks m2 120.00 105,000.00 12,600,000.00
- Cor Beton K-350 m3 17.28 893,475.00 15,439,248.00
9 KOLOM TYPE K13 (L 25x50) - 5 UNIT -
- Besi D 19 kg 847.12 10,636.00 9,009,968.32
- Besi D 10 kg 284.76 10,636.00 3,028,707.36
- Begisting Multipleks m2 30.00 105,000.00 3,150,000.00
- Cor Beton K-350 m3 3.75 893,475.00 3,350,531.25
10 KOLOM TYPE K14 (T 50x75) - 1 UNIT -
- Besi D 19 kg 211.78 10,636.00 2,252,492.08

Pek. Standart Gedung D - page 9 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

- Besi D 10 kg 35.86 10,636.00 381,406.96


- Begisting Multipleks m2 6.00 105,000.00 630,000.00
- Cor Beton K-350 m3 1.00 893,475.00 893,475.00
11 KOLOM TYPE K15 (25x25) - 6 UNIT -
- Besi D 19 kg 508.27 10,636.00 5,405,959.72
- Besi D 10 kg 141.53 10,636.00 1,505,313.08
- Begisting Multipleks m2 24.00 105,000.00 2,520,000.00
- Cor Beton K-350 m3 1.50 893,475.00 1,340,212.50
12 BALOK TANGGA TYPE BT (25x50) -
- Besi D 22 kg 148.53 10,636.00 1,579,765.08
- Besi D 13 kg 13.54 10,636.00 144,011.44
- Besi Ø 10 kg 42.30 10,636.00 449,902.80
- Begisting Multipleks m2 5.80 165,000.00 957,000.00
- Cor Beton K-350 m3 0.53 893,475.00 473,541.75
SUB TOTAL LANTAI DUA ( EL. + 8,95 M ) 2,100,270,689.12

E LANTAI TIGA ( EL. + 12,95 M )


1 BALOK TYPE B2 (40x70)
- Besi D 22 kg 24,784.98 10,636.00 263,613,047.28
- Besi D 13 kg 2,532.07 10,636.00 26,931,096.52
- Besi D 13 (Sengkang) kg 16,644.33 10,636.00 177,029,093.88
- Begisting Multipleks m2 818.47 105,000.00 85,939,350.00
- Cor Beton K-350 m3 121.18 893,475.00 108,271,300.50
2 BALOK TYPE BA (30x55) -
- Besi D 22 kg 9,774.58 10,636.00 103,962,432.88
- Besi D 13 kg 1,153.85 10,636.00 12,272,348.60
- Besi D 10 kg 2,217.49 10,636.00 23,585,223.64
- Begisting Multipleks m2 401.48 105,000.00 42,155,400.00
- Cor Beton K-350 m3 44.37 893,475.00 39,643,485.75
3 BALOK TYPE BA1 (25x45) -
- Besi D 19 kg 1,490.24 10,636.00 15,850,192.64
- Besi D 13 kg 210.47 10,636.00 2,238,558.92
- Besi Ø 10 kg 493.97 10,636.00 5,253,864.92
- Begisting Multipleks m2 81.97 105,000.00 8,606,850.00

Pek. Standart Gedung D - page 10 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

- Cor Beton K-350 m3 7.37 893,475.00 6,584,910.75


4 BALOK TYPE BA2 (20x35) -
- Besi D 16 kg 1,158.54 10,636.00 12,322,231.44
- Besi Ø 10 kg 418.72 10,636.00 4,453,505.92
- Begisting Multipleks m2 53.26 105,000.00 5,592,300.00
- Cor Beton K-350 m3 3.66 893,475.00 3,270,118.50
5 PLAT LANTAI TIGA S1 (t=13 cm) -
- Besi D 10 (Double Layer) kg 20,805.58 10,636.00 221,288,148.88
- Begisting m2 1,656.10 105,000.00 173,890,500.00
- Cor Beton K-350 m3 215.29 893,475.00 192,356,232.75
6 TANGGA ( 2 UNIT ) -
- Besi D 13 kg 300.49 10,636.00 3,196,011.64
- Besi Ø 10 kg 197.24 10,636.00 2,097,844.64
- Besi Trap Ø10 kg 106.81 10,636.00 1,136,031.16
- Begisting Multipleks m2 146.60 165,000.00 24,189,000.00
- Cor Beton K-350 m3 7.24 893,475.00 6,468,759.00
1 KOLOM TYPE K2 (65x65) - 12 UNIT -
- Besi D 22 kg 4,191.77 10,636.00 44,583,665.72
- Besi D 13 kg 3,590.15 10,636.00 38,184,835.40
- Begisting Multipleks m2 124.80 105,000.00 13,104,000.00
- Cor Beton K-350 m3 20.28 893,475.00 18,119,673.00
7 KOLOM TYPE K4 (65x65) - 28 UNIT -
- Besi D 22 kg 9,780.79 10,636.00 104,028,482.44
- Besi D 13 kg 8,377.02 10,636.00 89,097,984.72
- Begisting Multipleks m2 291.20 105,000.00 30,576,000.00
- Cor Beton K-350 m3 47.32 893,475.00 42,279,237.00
8 KOLOM TYPE K6 (45x80) - 12 UNIT -
- Besi D 22 kg 3,842.45 10,636.00 40,868,298.20
- Besi D 13 kg 2,874.82 10,636.00 30,576,585.52
- Begisting Multipleks m2 120.00 105,000.00 12,600,000.00
- Cor Beton K-350 m3 17.28 893,475.00 15,439,248.00
9 KOLOM TYPE K13 (L 25x50) - 5 UNIT -
- Besi D 19 kg 847.12 10,636.00 9,009,968.32
- Besi D 10 kg 306.02 10,636.00 3,254,828.72
- Begisting Multipleks m2 30.00 105,000.00 3,150,000.00
- Cor Beton K-350 m3 3.75 893,475.00 3,350,531.25
10 KOLOM TYPE K14 (T 50x75) - 1 UNIT -
- Besi D 19 kg 211.78 10,636.00 2,252,492.08
- Besi D 10 kg 108.48 10,636.00 1,153,793.28
- Begisting Multipleks m2 6.00 105,000.00 630,000.00
- Cor Beton K-350 m3 1.00 893,475.00 893,475.00
11 KOLOM TYPE K15 (25x25) - 6 UNIT -
- Besi D 19 kg 508.27 10,636.00 5,405,959.72
- Besi D 10 kg 141.53 10,636.00 1,505,313.08
- Begisting Multipleks m2 24.00 105,000.00 2,520,000.00
- Cor Beton K-350 m3 1.50 893,475.00 1,340,212.50
12 BALOK TANGGA TYPE BT (25x50) -
- Besi D 22 kg 148.53 10,636.00 1,579,765.08
- Besi D 13 kg 13.54 10,636.00 144,011.44
- Besi Ø 10 kg 42.30 10,636.00 449,902.80
- Begisting Multipleks m2 5.80 165,000.00 957,000.00
- Cor Beton K-350 m3 0.53 893,475.00 473,541.75
SUB TOTAL LANTAI TIGA ( EL. + 12,95 M ) 2,089,726,645.23

F LANTAI EMPAT ( EL. + 16,95 M )


1 BALOK TYPE B2 (40x70)
- Besi D 22 kg 24,850.01 10,636.00 264,304,706.36
- Besi D 13 kg 2,542.88 10,636.00 27,046,071.68
- Besi D 13 (Sengkang) kg 16,631.79 10,636.00 176,895,718.44
- Begisting Multipleks m2 817.63 105,000.00 85,851,150.00
- Cor Beton K-350 m3 121.05 893,475.00 108,155,148.75

Pek. Standart Gedung D - page 11 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

2 BALOK TYPE BA (30x55) -


- Besi D 22 kg 9,274.71 10,636.00 98,645,815.56
- Besi D 13 kg 1,169.66 10,636.00 12,440,503.76
- Besi D 10 kg 2,203.62 10,636.00 23,437,702.32
- Begisting Multipleks m2 397.75 105,000.00 41,763,750.00
- Cor Beton K-350 m3 43.96 893,475.00 39,277,161.00
3 BALOK TYPE BA1 (25x45) -
- Besi D 19 kg 87.69 10,636.00 932,670.84
- Besi D 13 kg 10.60 10,636.00 112,741.60
- Besi Ø 10 kg 25.14 10,636.00 267,389.04
- Begisting Multipleks m2 3.65 105,000.00 383,250.00
- Cor Beton K-350 m3 0.33 893,475.00 294,846.75
4 BALOK TYPE BA2 (20x35) -
- Besi D 16 kg 90.77 10,636.00 965,429.72
- Besi Ø 10 kg 35.49 10,636.00 377,471.64
- Begisting Multipleks m2 4.19 105,000.00 439,950.00
- Cor Beton K-350 m3 0.29 893,475.00 259,107.75
5 PLAT LANTAI EMPAT S1 (t=13 cm) -
- Besi D 10 (Double Layer) kg 374.95 10,636.00 3,987,968.20
- Begisting m2 26.78 105,000.00 2,811,900.00
- Cor Beton K-350 m3 3.48 893,475.00 3,109,293.00
6 PLAT LANTAI EMPAT SA (t=12 cm) -
- Besi D 10 (Double Layer) kg 20,880.38 10,636.00 222,083,721.68
- Begisting m2 1,642.70 105,000.00 172,483,500.00
- Cor Beton K-350 m3 197.12 893,475.00 176,121,792.00
- Water Profing Bithuthene Sheet 3000 m2 1,642.70 91,747.00 150,712,796.90
- Pasangan screed lengkap kawat ayam m2 1,642.70 45,000.00 73,921,500.00
7 TANGGA ( 2 UNIT ) -
- Besi D 13 kg 150.24 10,636.00 1,597,952.64
- Besi Ø 10 kg 98.62 10,636.00 1,048,922.32
- Besi Trap Ø10 kg 53.41 10,636.00 568,068.76
- Begisting Multipleks m2 73.30 165,000.00 12,094,500.00
- Cor Beton K-350 m3 3.62 893,475.00 3,234,379.50
8 KOLOM TYPE K4 (65x65) - 40 UNIT -
- Besi D 22 kg 5,287.43 10,636.00 56,237,105.48
- Besi D 13 kg 4,953.08 10,636.00 52,680,958.88
- Begisting Multipleks m2 166.40 105,000.00 17,472,000.00
- Cor Beton K-350 m3 27.04 893,475.00 24,159,564.00
10 KOLOM TYPE K12 (L 25x50) - 5 UNIT -
- Besi D 19 kg 1,058.90 10,636.00 11,262,460.40
- Besi D 10 kg 35.86 10,636.00 381,406.96
- Begisting Multipleks m2 30.00 105,000.00 3,150,000.00
- Cor Beton K-350 m3 5.00 893,475.00 4,467,375.00
12 KOLOM TYPE K11 (T 50x25) - 1 UNIT -
- Besi D 19 kg 169.42 10,636.00 1,801,951.12
- Besi D 10 kg 56.95 10,636.00 605,720.20
- Begisting Multipleks m2 6.00 105,000.00 630,000.00
- Cor Beton K-350 m3 0.75 893,475.00 670,106.25
13 KOLOM TYPE K15 (25x25) - 4 UNIT -
- Besi D 19 kg 338.85 10,636.00 3,604,008.60
- Besi D 10 kg 94.36 10,636.00 1,003,612.96
- Begisting Multipleks m2 16.00 105,000.00 1,680,000.00
- Cor Beton K-350 m3 1.00 893,475.00 893,475.00
-
14 KOLOM BAJA TYPE KB ( 16 UNIT ) -
- H 300.300.10.15 kg 4,512.00 25,845.00 116,612,640.00
- Base plate 55 x 55 cm t = 20 mm unit 16.00 1,091,235.00 17,459,760.00
- End plate t = 20 mm unit 32.00 189,530.00 6,064,960.00
- Steiffener t = 9 mm kg 225.60 25,845.00 5,830,632.00
- Angker Bolt Ø 25 mm - p = 50 cm bh 128.00 223,990.00 28,670,720.00
- Baut HTB Ø 19 mm bh 96.00 22,973.00 2,205,408.00

Pek. Standart Gedung D - page 12 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

SUB TOTAL LANTAI EMPAT ( EL. + 16,95 M ) 2,063,170,745.06

G LANTAI LIMA ( EL. + 20,95 M )


1 BALOK TYPE B2 (40x70)
- Besi D 22 kg 2,599.61 10,636.00 27,649,451.96
- Besi D 13 kg 241.61 10,636.00 2,569,763.96
- Besi D 13 (Sengkang) kg 1,699.11 10,636.00 18,071,733.96
- Begisting Multipleks m2 93.69 105,000.00 9,837,450.00
- Cor Beton K-350 m3 14.57 893,475.00 13,017,930.75
2 BALOK TYPE B3 (35x70) -
- Besi D 22 kg 362.49 10,636.00 3,855,443.64
- Besi D 13 kg 37.16 10,636.00 395,233.76
- Besi D 13 (Sengkang) kg 334.05 10,636.00 3,552,955.80
- Begisting Multipleks m2 12.28 105,000.00 1,289,400.00
- Cor Beton K-350 m3 1.64 893,475.00 1,465,299.00
3 BALOK TYPE BA (30x55) -
- Besi D 22 kg 433.78 10,636.00 4,613,684.08
- Besi D 13 kg 31.99 10,636.00 340,245.64
- Besi D 10 kg 93.36 10,636.00 992,976.96
- Begisting Multipleks m2 18.90 105,000.00 1,984,500.00
- Cor Beton K-350 m3 2.23 893,475.00 1,992,449.25
4 BALOK TYPE BA1 (25x45) -
- Besi D 19 kg 85.74 10,636.00 911,930.64
- Besi D 13 kg 10.30 10,636.00 109,550.80
- Besi Ø 10 kg 28.10 10,636.00 298,871.60
- Begisting Multipleks m2 5.12 105,000.00 537,600.00
- Cor Beton K-350 m3 0.50 893,475.00 446,737.50
5 PLAT LANTAI LIMA SA (t=12 cm) -
- Besi D 10 (Double Layer) kg 2,126.98 10,636.00 22,622,559.28
- Begisting m2 151.88 105,000.00 15,947,400.00
- Cor Beton K-350 m3 18.23 893,475.00 16,288,049.25
- Water Profing Bithuthene Sheet 3000 m2 151.88 91,747.00 13,934,534.36
- Pasangan screed lengkap kawat ayam m2 151.88 45,000.00 6,834,600.00
6 BALOK BAJA UTAMA -
- WF 350.175.7.11 kg 8,035.20 25,845.00 207,669,744.00
- End plate t = 20 mm unit 32.00 189,530.00 6,064,960.00
- Steiffener t = 9 mm kg 401.76 25,845.00 10,383,487.20
- Baut HTB Ø 19 mm bh 128.00 22,973.00 2,940,544.00
7 BALOK BAJA CANTILEVER -
- WF 350.175.7.11 kg 1,190.40 25,845.00 30,765,888.00
- End plate t = 20 mm unit 40.00 189,530.00 7,581,200.00
- Steiffener t = 9 mm kg 59.52 25,845.00 1,538,294.40
- Baut HTB Ø 19 mm bh 160.00 22,973.00 3,675,680.00
8 BALOK BAJA PEMBAGI -
- WF 300.150.6,5.9 kg 1,614.80 25,845.00 41,734,506.00
- End plate t = 20 mm unit 44.00 189,530.00 8,339,320.00
- Steiffener t = 9 mm kg 80.74 25,845.00 2,086,725.30
- Baut HTB Ø 19 mm bh 132.00 22,973.00 3,032,436.00
9 BALOK BAJA TEPI -
- UNP 200.80.7,5 kg 3,236.27 25,845.00 83,641,398.15
- End plate t = 12 mm unit 256.00 189,530.00 48,519,680.00
- Steiffener t = 9 mm kg 161.81 25,845.00 4,181,979.45
- Baut HTB Ø 19 mm bh 256.00 22,973.00 5,881,088.00

SUB TOTAL LANTAI LIMA ( EL. + 20,95 M ) 637,597,282.69

Pek. Standart Gedung D - page 13 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

III. PEKERJAAN ARSITEK


3.1. PEKERJAAN PENGADAAN, PEMASANGAN DINDING DAN PELAPIS DINDING
A. LOWER GROUND
1 Dinding bata ringan 200 x 600 x 100 mm m² 875.91 122,584.00 107,372,551.44
2 Plesteran semen instan m² 1,686.37 60,592.00 102,180,531.04
3 Acian semen instan m² 2,147.11 22,013.00 47,264,332.43
4 Opening pintu & jendela m' 106.95 8,615.00 921,374.25
5 Kolom praktis 10/10 cm m³ 3.35 4,020,339.00 13,468,135.65
6 Balok praktis 10/15 cm m³ 0.34 4,020,339.00 1,366,915.26
7 Dinding keramik 20 x 40 cm m² 4,020,339.00 -
Dinding keramik 20 x 40 cm 60.79 180,789.00 10,990,163.31
8 Dinding border keramik 20 x 40 cm m² 11.66 180,789.00 2,107,999.74
9 Dinding homogeneous tile 30 x 60 cm m² 8.17 242,214.00 1,978,888.38
10 Plint homogeneous tile 10 x 60 cm cutting size m' 218.90 52,379.00 11,465,763.10
11 Plint homogeneous tile 10 x 30 cm cutting size m' 9.25 44,169.00 408,563.25
12 Plint keramik 10 x 20 cm cutting size m' 24.85 42,197.00 1,048,595.45
13 Pengecatan plint int semi gloss m' 57.20 5,169.00 295,666.80
14 Meja beton tebal 10 cm, d8-150 mm m³ 0.09 4,020,339.00 361,830.51
15 Keramik 30 x 30 cm pelapis meja beton m² 1.13 183,926.00 207,836.38
-
B. GROUND FLOOR -
1 Dinding bata ringan 200 x 600 x 100 mm m² 2,149.86 122,584.00 263,538,438.24
2 Memasang dinding partisi gypsum dua layer m² 34.70 125,492.00 4,354,572.40
3 Plesteran semen instan m² 4,217.36 60,592.00 255,538,277.12
4 Acian semen instan m² 3,795.63 22,013.00 83,553,203.19
5 Opening pintu & jendela m' 317.30 8,615.00 2,733,539.50
6 Kolom praktis 10/10 cm m³ 11.50 4,020,339.00 46,233,898.50
7 Balok praktis 10/15 cm m³ 0.89 4,020,339.00 3,578,101.71
8 Meja beton tebal 10 cm, d8-150 mm m³ 0.28 4,020,339.00 1,125,694.92
9 Finising granite pelapis meja beton wastafel m² 2.17 1,812,419.00 3,932,949.23
10 Dinding keramik 20 x 40 cm m² 60.79 180,789.00 10,990,163.31
11 Dinding border keramik 20 x 40 cm m² 24.85 180,789.00 4,492,606.65
12 Plint homogeneous tile 10 x 60 cm cutting size m' 22.40 52,379.00 1,173,289.60
13 Plint keramik 10 x 20 cm cutting size m' 32.10 42,197.00 1,354,523.70
14 Pengecatan plint int semi gloss m' 39.80 5,169.00 205,726.20
15 Keramik 30 x 30 cm pelapis meja beton m² 1.13 183,926.00 207,836.38
-
C. LANTAI SATU -
1 Dinding bata ringan 200 x 600 x 100 mm m² 1,835.27 122,584.00 224,974,737.68
2 Plesteran semen instan m² 3,619.49 60,592.00 219,312,138.08
3 Acian semen instan m² 3,257.54 22,013.00 71,708,228.02
4 Opening pintu & jendela m' 391.10 8,615.00 3,369,326.50
5 Kolom praktis 10/10 cm m³ 10.13 4,020,339.00 40,726,034.07
6 Balok praktis 10/15 cm m³ 1.07 4,020,339.00 4,301,762.73
7 Dinding keramik 20 x 40 cm m² 4,020,339.00 -
Dinding keramik 20 x 40 cm 51.06 180,789.00 9,231,086.34
8 Dinding border keramik 20 x 40 cm m² 4.16 180,789.00 752,082.24
9 Plint homogeneous tile 10 x 60 cm cutting size m' 22.40 52,379.00 1,173,289.60
10 Plint keramik 10 x 20 cm cutting size m' 16.50 42,197.00 696,250.50
11 Pengecatan plint int semi gloss m' 39.80 5,169.00 205,726.20
12 Meja beton tebal 10 cm, d8-150 mm m³ 0.09 4,020,339.00 361,830.51
13 Keramik 30 x 30 cm pelapis meja beton m² 1.13 183,926.00 207,836.38
-
D. LANTAI DUA -
1 Dinding bata ringan 200 x 600 x 100 mm m² 2,359.80 122,584.00 289,273,723.20
2 Plesteran semen instan m² 4,094.23 60,592.00 248,077,584.16
3 Acian semen instan m² 4,094.23 22,013.00 90,126,284.99
4 Opening pintu & jendela m' 456.80 8,615.00 3,935,332.00
5 Kolom praktis 10/10 cm m³ 13.29 4,020,339.00 53,430,305.31
6 Balok praktis 10/15 cm m³ 1.20 4,020,339.00 4,824,406.80
7 Meja beton tebal 10 cm, d8-150 mm m³ 1.91 4,020,339.00 7,678,847.49
8 Finising granite pelapis meja beton wastafel m² 5.60 1,812,419.00 10,149,546.40
9 Dinding keramik 20 x 40 cm m² 540.99 180,789.00 97,805,041.11
10 Dinding border keramik 20 x 40 cm m² 460.30 180,789.00 83,217,176.70
11 Dinding homogeneous tile 30 x 60 cm m² 70.80 242,214.00 17,148,751.20
12 Plint homogeneous tile 10 x 60 cm cutting size m' 22.40 52,379.00 1,173,289.60
13 Plint homogeneous tile 10 x 30 cm cutting size m' 25.55 44,169.00 1,128,517.95
14 Plint keramik 10 x 20 cm cutting size m' 221.31 42,197.00 9,338,618.07
15 Pengecatan plint int semi gloss m' - 5,169.00 -
16 Keramik 30 x 30 cm pelapis meja beton m² 1.13 183,926.00 207,836.38
-
E. LANTAI TIGA -
1 Dinding bata ringan 200 x 600 x 100 mm m² 2,334.50 122,584.00 286,172,348.00
2 Plesteran semen instan m² 3,967.66 60,592.00 240,408,454.72
3 Acian semen instan m² 3,967.66 22,013.00 87,340,099.58
4 Opening pintu & jendela m' 457.10 8,615.00 3,937,916.50
5 Kolom praktis 10/10 cm m³ 13.44 4,020,339.00 54,033,356.16
6 Balok praktis 10/15 cm m³ 1.22 4,020,339.00 4,904,813.58
7 Meja beton tebal 10 cm, d8-150 mm m³ 1.67 4,020,339.00 6,713,966.13
8 Finising granite pelapis meja beton wastafel m² 5.63 1,812,419.00 10,203,918.97
9 Keramik 30 x 30 cm pelapis meja beton m² 1.13 183,926.00 207,836.38

Pek. Standart Gedung D - page 14 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

10 Dinding keramik 20 x 40 cm m² 585.42 180,789.00 105,837,496.38


11 Dinding border keramik 20 x 40 cm m² 238.50 180,789.00 43,118,176.50
12 Dinding homogeneous tile 30 x 60 cm m² 70.80 242,214.00 17,148,751.20
13 Plint homogeneous tile 10 x 60 cm cutting size m' 22.40 52,379.00 1,173,289.60
14 Plint homogeneous tile 10 x 30 cm cutting size m' 25.55 44,169.00 1,128,517.95
15 Plint keramik 10 x 20 cm cutting size m' 238.50 42,197.00 10,063,984.50
16 Pengecatan plint int semi gloss m' 39.80 5,169.00 205,726.20
-
F. LANTAI RUANG MESIN LIFT -
1 Dinding bata ringan 200 x 600 x 100 mm m² 273.66 122,584.00 33,546,337.44
2 Plesteran semen instan m² 547.31 60,592.00 33,162,607.52
3 Acian semen instan m² 547.31 22,013.00 12,047,935.03
4 Opening pintu & jendela m' 11.30 8,615.00 97,349.50
5 Kolom praktis 10/10 cm m³ 0.46 4,020,339.00 1,849,355.94
6 Balok praktis 10/15 cm m³ 2.10 4,020,339.00 8,442,711.90
SUB TOTAL PEKERJAAN PENGADAAN, PEMASANGAN DINDING DAN PELAPIS DINDING 3,440,732,507.53

3.2. PEKERJAAN PENGADAAN & PEMASANGAN LANTAI


A. LOWER GROUND
1 Lantai homogeneous tile 60 x 60 cm (Polished) m² 578.00 236,339.00 136,603,942.00
2 Lantai homogeneous tile 60 x 60 cm (Unpolished) m² - 236,339.00 -
3 Lantai keramik 20 x 20 cm m² 7.82 201,373.00 1,574,736.86
4 Step noising keramik tile 5 x 20 cm m' 67.60 69,076.00 4,669,537.60
5 Floor hardener m² 937.20 36,183.00 33,910,707.60
-
B. GROUND FLOOR -
1 Lantai homogeneous tile 60 x 60 cm (Polished) m² 1,121.76 236,339.00 265,115,636.64
2 Lantai keramik 20 x 20 cm m² 9.07 201,373.00 1,826,453.11
3 Step noising keramik tile 5 x 20 cm m' 75.40 69,076.00 5,208,330.40
4 Waterproofing coating toilet m² 30.35 62,028.00 1,882,549.80
5 Floor hardener m² 48.67 36,183.00 1,761,026.61
6 Memasang hospital plint m' 772.98 80,062.00 61,886,324.76
7 Memasang vinyl sheet m² 119.94 446,200.00 53,517,228.00
8 Plint vinyl sheet (curve base skirting) m' 65.80 80,062.00 5,268,079.60
-
C. LANTAI SATU -
1 Lantai homogeneous tile 60 x 60 cm (Polished) m² 1,413.05 236,339.00 333,958,823.95
2 Lantai keramik 20 x 20 cm m² 7.82 201,373.00 1,574,736.86
3 Step noising keramik tile 5 x 20 cm m' 62.40 69,076.00 4,310,342.40
4 Waterproofing coating toilet m² 6.71 62,028.00 416,207.88
5 Floor hardener m² 44.53 36,183.00 1,611,228.99
-
D. LANTAI DUA -
1 Lantai homogeneous tile 60 x 60 cm (Polished) m² 1,380.14 236,339.00 326,180,907.46
2 Lantai keramik 20 x 20 cm m² 126.57 201,373.00 25,487,780.61
3 Step noising keramik tile 5 x 20 cm m' 67.60 69,076.00 4,669,537.60
4 Waterproofing coating toilet m² 135.54 62,028.00 8,407,275.12
5 Floor hardener m² 52.81 36,183.00 1,910,824.23
-
E. LANTAI TIGA -
1 Lantai homogeneous tile 60 x 60 cm (Polished) m² 1,374.79 236,339.00 324,916,493.81
2 Lantai homogeneous tile 60 x 60 cm (Unpolished) m² - 236,339.00 -
3 Lantai keramik 20 x 20 cm m² 130.80 201,373.00 26,339,588.40
4 Step noising keramik tile 5 x 20 cm m' 67.60 69,076.00 4,669,537.60
5 Waterproofing coating toilet m² 144.66 62,028.00 8,972,970.48
6 Floor hardener m² 52.81 36,183.00 1,910,824.23
-
F. LANTAI RUANG MESIN LIFT -
1 Waterproofing membrant sheet m² 1,612.50 91,747.00 147,942,037.50
2 Pekerjaan screeding beton + kawat ayam m² 1,612.50 45,000.00 72,562,500.00
3 Floor hardener m² 14.00 36,183.00 506,562.00
SUB TOTAL PEKERJAAN PENGADAAN & PEMASANGAN LANTAI 1,869,572,732.10

3.3. PEKERJAAN PENGADAAN & PEMASANGAN PLAFOND


A. LOWER GROUND
1 Plafond gypsum tebal 9 mm rangka metal furing m² 557.10 103,667.00 57,752,885.70
2 Plafond GRC 6 mm rangka metal furing m² 112.50 141,861.00 15,959,362.50
3 List alumunium grouting m' 9.50 24,553.00 233,253.50
4 Plafond exposed m² 865.14 33,193.00 28,716,592.02
5 Drop ceiling gypsum tebal 9 mm m' 22.00 76,386.00 1,680,492.00
-
B. GROUND FLOOR -
1 Plafond gypsum tebal 9 mm rangka metal furing m² 1,423.20 103,667.00 147,538,874.40
2 Plafond GRC 6 mm rangka metal furing m² 25.50 141,861.00 3,617,455.50
3 List alumunium grouting m' 27.00 24,553.00 662,931.00
4 Plafond exposed m² 105.00 33,193.00 3,485,265.00
5 Plafond curtain box gypsum board rangka metal fu m' 86.00 174,598.00 15,015,428.00
6 Plafond metal ceiling 60 x 60 cm pervorated m² 86.00 945,928.00 81,349,808.00
7 Drop ceiling gypsum tebal 9 mm m' 21.50 76,386.00 1,642,299.00
-
C. LANTAI SATU -

Pek. Standart Gedung D - page 15 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

1 Plafond gypsum tebal 9 mm rangka metal furing m² 1,516.62 103,667.00 157,223,445.54


2 Plafond GRC 6 mm rangka metal furing m² 10.50 141,861.00 1,489,540.50
3 List alumunium grouting m' 19.00 24,553.00 466,507.00
4 Plafond exposed m² 120.00 33,193.00 3,983,160.00
5 Plafond curtain box gypsum board rangka metal fu m' 176.00 174,598.00 30,729,248.00
6 Drop ceiling gypsum tebal 9 mm m' 20.02 76,386.00 1,529,247.72
-
D. LANTAI DUA -
1 Plafond gypsum tebal 9 mm rangka metal furing m² 1,358.00 103,667.00 140,779,786.00
2 Plafond GRC 6 mm rangka metal furing m² 121.00 141,861.00 17,165,181.00
3 List alumunium grouting m' 176.50 24,553.00 4,333,604.50
4 Plafond exposed m² 122.00 33,193.00 4,049,546.00
5 Plafond curtain box gypsum board rangka metal fu m' 20.99 174,598.00 3,664,812.02
-
E. LANTAI TIGA -
1 Plafond gypsum tebal 9 mm rangka metal furing m² 1,449.00 103,667.00 150,213,483.00
2 Plafond GRC 6 mm rangka metal furing m² 118.50 141,861.00 16,810,528.50
3 List alumunium grouting m' 158.00 24,553.00 3,879,374.00
4 Plafond exposed m² 106.50 33,193.00 3,535,054.50
5 Plafond curtain box gypsum board rangka metal fu m' 21.99 174,598.00 3,839,410.02
-
F. LANTAI RUANG MESIN LIFT -
1 Plafond exposed m² 47.00 33,193.00 1,560,071.00
SUB TOTAL PEKERJAAN PENGADAAN & PEMASANGAN PLAFOND 902,906,645.92

3.4. PEKERJAAN PENGADAAN, PEMASANGAN PINTU DAN JENDELA


A. LOWER GROUND
PINTU ALLUMUNIUM TYPE
1 A (AL-ED Uk. 2 x 900 x 2150) unit 1.00 7,153,646.00 7,153,646.00
2 A (AL-ED Uk. 900 x 2150) unit 3.00 3,972,178.00 11,916,534.00
3 C (AL-ED Uk. 900 x 2150) unit 1.00 3,662,534.00 3,662,534.00
4 C (AL-ED/PL Uk. 750 x 2150) unit 1.00 2,988,253.00 2,988,253.00
5 C (AL-ED/PL Uk. 900 x 2150) unit 2.00 3,662,534.00 7,325,068.00
6 E (AL/GL-1 Uk. 2 x 900 x 2150) *8 mm Thick unit 3.00 6,366,484.00 19,099,452.00
7 M (AL-ED Uk. 900 x 2150) unit 1.00 3,164,147.00 3,164,147.00
8 A (HM Uk. 2 x 600 x 2150) unit 1.00 8,074,626.00 8,074,626.00
9 A (HM Uk. 900 x 2150) unit 1.00 8,933,545.00 8,933,545.00
10 A (HM Uk. 900 x 2150) Tahan Api unit 2.00 13,755,244.00 27,510,488.00
11 C (HM Uk. 900 x 2150) unit 1.00 9,760,528.00 9,760,528.00
-
B. GROUND FLOOR -
PINTU ALLUMUNIUM TYPE -
1 Pintu lobby tipe D-1D unit 1.00 96,265,834.00 96,265,834.00
2 A (AL-ED Uk. 900 x 2150) unit 1.00 3,972,178.00 3,972,178.00
3 B (AL-ED Uk. 1200 x 2150) unit 12.00 4,900,986.00 58,811,832.00
4 B (AL-ED Uk. 2 x 900 x 2150) unit 1.00 6,053,656.00 6,053,656.00
5 B (AL-ED Uk. 900 x 2150) unit 14.00 3,414,145.00 47,798,030.00
6 C (AL-ED Uk. 900 x 2150) unit 2.00 3,662,534.00 7,325,068.00
7 C (AL-ED/PL Uk. 750 x 2150) unit 2.00 2,988,253.00 5,976,506.00
8 C (AL-ED/PL Uk. 900 x 2150) unit 2.00 3,662,534.00 7,325,068.00
9 E (AL/GL-1 Uk. 2 x 900 x 2150) *8 mm Thick unit 1.00 6,366,484.00 6,366,484.00
10 E (AL/GL-1 Uk. 900 x 2150) *8 mm Thick unit 2.00 3,524,659.00 7,049,318.00
11 M (AL-ED Uk. 900 x 2150) unit 3.00 3,164,147.00 9,492,441.00
12 A (HM Uk. 2 x 600 x 2150) unit 1.00 8,074,626.00 8,074,626.00
13 A (HM Uk. 600 x 2150) unit 7.00 5,010,344.00 35,072,408.00
14 A (HM Uk. 900 x 2150) Tahan Api unit 2.00 13,755,244.00 27,510,488.00
15 C (HM Uk. 900 x 2150) unit 1.00 9,760,528.00 9,760,528.00
-
JENDELA ALLUMUNIUM TYPE -
1 Jendela Dalam tipe DW-1 unit 1.00 9,697,751.00 9,697,751.00
2 Jendela tipe W-1 unit 1.00 11,034,282.00 11,034,282.00
3 Bouvenlight tipe GB-1 unit 6.00 674,843.00 4,049,058.00
4 Curtainwall tipe CW-3 m2 1,591.17 1,670,437.00 2,657,949,241.29
5 Curtainwall tipe CW-2 m2 83.64 1,670,437.00 139,715,350.68
6 Curtainwall tipe CW-2' m2 75.45 1,670,437.00 126,034,471.65
7 Curtainwall tipe CW-1 m2 22.02 1,670,437.00 36,783,022.74
-
C. LANTAI SATU -
PINTU ALLUMUNIUM TYPE -
1 A (AL-ED Uk. 900 x 2150) unit 6.00 3,972,178.00 23,833,068.00
2 B (AL-ED Uk. 1200 x 2150) unit 20.00 4,900,986.00 98,019,720.00
3 B (AL-ED Uk. 900 x 2150) unit 17.00 3,414,145.00 58,040,465.00
4 C (AL-ED Uk. 900 x 2150) unit 1.00 3,662,534.00 3,662,534.00
5 C (AL-ED/PL Uk. 900 x 2150) unit 2.00 3,662,534.00 7,325,068.00
6 A (HM Uk. 2 x 600 x 2150) unit 1.00 8,074,626.00 8,074,626.00
7 A (HM Uk. 600 x 2150) unit 8.00 5,010,344.00 40,082,752.00
8 A (HM Uk. 900 x 2150) Tahan Api unit 2.00 13,755,244.00 27,510,488.00
9 C (HM Uk. 900 x 2150) unit 1.00 9,760,528.00 9,760,528.00
10 Curtainwall tipe CW-4 unit 238.82 1,670,437.00 398,933,764.34
-
JENDELA ALLUMUNIUM TYPE -

Pek. Standart Gedung D - page 16 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

1 Bouvenlight tipe GB-1 unit 6.00 674,843.00 4,049,058.00


-
D. LANTAI DUA -
PINTU ALLUMUNIUM TYPE -
1 A (AL-ED Uk. 2 x 900 x 2150) unit 1.00 7,153,646.00 7,153,646.00
2 A (AL-ED Uk. 900 x 2150) unit 2.00 3,972,178.00 7,944,356.00
3 B (AL-ED Uk. 1200 x 2150) unit 23.00 4,900,986.00 112,722,678.00
4 B (AL-ED Uk. 2 x 900 x 2150) unit 1.00 6,053,656.00 6,053,656.00
5 B (AL-ED Uk. 900 x 2150) unit 3.00 3,414,145.00 10,242,435.00
6 C (AL-ED Uk. 900 x 2150) unit 6.00 3,662,534.00 21,975,204.00
7 C (AL-ED/PL Uk. 750 x 2150) unit 24.00 2,988,253.00 71,718,072.00
8 C (AL-ED/PL Uk. 900 x 2150) unit 3.00 3,662,534.00 10,987,602.00
9 M (AL-ED Uk. 900 x 2150) unit 4.00 3,164,147.00 12,656,588.00
10 A (HM Uk. 2 x 600 x 2150) unit 1.00 8,074,626.00 8,074,626.00
11 A (HM Uk. 600 x 2150) unit 9.00 5,010,344.00 45,093,096.00
12 A (HM Uk. 900 x 2150) Tahan Api unit 2.00 13,755,244.00 27,510,488.00
13 C (HM Uk. 900 x 2150) unit 1.00 9,760,528.00 9,760,528.00
-
JENDELA ALLUMUNIUM TYPE -
1 Bouvenlight tipe GB-1 unit 6.00 674,843.00 4,049,058.00
-
E. LANTAI TIGA -
PINTU ALLUMUNIUM TYPE -
1 A (AL-ED Uk. 2 x 900 x 2150) unit 1.00 7,153,646.00 7,153,646.00
2 A (AL-ED Uk. 900 x 2150) unit 4.00 3,972,178.00 15,888,712.00
3 B (AL-ED Uk. 1200 x 2150) unit 21.00 4,900,986.00 102,920,706.00
4 B (AL-ED Uk. 2 x 900 x 2150) unit 1.00 6,053,656.00 6,053,656.00
5 B (AL-ED Uk. 900 x 2150) unit 3.00 3,414,145.00 10,242,435.00
6 C (AL-ED Uk. 900 x 2150) unit 5.00 3,662,534.00 18,312,670.00
7 C (AL-ED/PL Uk. 750 x 2150) unit 22.00 2,988,253.00 65,741,566.00
8 C (AL-ED/PL Uk. 900 x 2150) unit 2.00 3,662,534.00 7,325,068.00
9 M (AL-ED Uk. 900 x 2150) unit 4.00 3,164,147.00 12,656,588.00
10 A (HM Uk. 2 x 600 x 2150) unit 1.00 8,074,626.00 8,074,626.00
11 A (HM Uk. 600 x 2150) unit 9.00 5,010,344.00 45,093,096.00
12 A (HM Uk. 900 x 2150) Tahan Api unit 2.00 13,755,244.00 27,510,488.00
13 C (HM Uk. 900 x 2150) unit 1.00 9,760,528.00 9,760,528.00
-
JENDELA ALLUMUNIUM TYPE -
1 Jendela tipe W-1C unit 1.00 3,269,472.00 3,269,472.00
2 Jendela tipe W-2C unit 1.00 5,613,427.00 5,613,427.00
3 Bouvenlight tipe GB-1 unit 6.00 674,843.00 4,049,058.00
-
F. LANTAI RUANG MESIN LIFT -
PINTU ALLUMUNIUM TYPE -
1 A (HM Uk. 900 x 2150) Tahan Api unit 2.00 13,755,244.00 27,510,488.00
SUB TOTAL PEKERJAAN PENGADAAN, PEMASANGAN PINTU DAN JENDELA 4,844,116,797.70

3.5. PEKERJAAN PENGADAAN & PEMASANGAN SANITAIR


A. LOWER GROUND
1 Kloset duduk lengkap dengan aksesoris set 1.00 2,640,313.00 2,640,313.00
2 Wastafel gantung lengkap dengan aksesoris set 2.00 2,803,697.00 5,607,394.00
3 Cove ligth wastafel bh 1.00 373,317.00 373,317.00
4 Kaca cermin m² 1.47 344,600.00 506,562.00
5 Jet washer set 1.00 624,400.00 624,400.00
6 Tissue holder bh 1.00 453,420.00 453,420.00
7 Floor drain bh 1.00 389,382.00 389,382.00
8 Memasang kran dinding Ø 1/2" bh 5.00 303,391.00 1,516,955.00
9 Zink satu lubang + accessories set 1.00 1,452,756.00 1,452,756.00
Service Sink set 1.00 8,120,000.00 8,120,000.00
Slop Sink set 1.00 11,750,000.00 11,750,000.00
-
B. GROUND FLOOR -
1 Kloset duduk lengkap dengan aksesoris set 3.00 2,640,313.00 7,920,939.00
2 Wastafel gantung lengkap dengan aksesoris set 28.00 2,803,697.00 78,503,516.00
3 Wastafel under counter lengkap dengan aksesoris set 3.00 1,965,019.00 5,895,057.00
4 Cove ligth wastafel bh 30.00 373,317.00 11,199,510.00
5 Kaca cermin m² 60.43 344,600.00 20,824,178.00
6 Jet washer set 3.00 624,400.00 1,873,200.00
7 Tissue holder bh 3.00 453,420.00 1,360,260.00
8 Floor drain bh 3.00 389,382.00 1,168,146.00
9 Memasang kran dinding Ø 1/2" bh - 303,391.00 -
10 Zink satu lubang + accessories set 1.00 1,452,756.00 1,452,756.00
Service Sink set 1.00 8,120,000.00 8,120,000.00
Slop Sink set 1.00 11,750,000.00 11,750,000.00
-
C. LANTAI SATU -
1 Wastafel gantung lengkap dengan aksesoris set 21.00 2,803,697.00 58,877,637.00
2 Cove ligth wastafel bh 20.00 373,317.00 7,466,340.00
3 Kaca cermin m² 40.95 344,600.00 14,111,370.00
4 Floor drain bh - 389,382.00 -
5 Zink satu lubang + accessories set 1.00 1,452,756.00 1,452,756.00

Pek. Standart Gedung D - page 17 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

Service Sink set 1.00 8,120,000.00 8,120,000.00


Slop Sink set 1.00 11,750,000.00 11,750,000.00
-
-
D. LANTAI DUA -
1 Kloset duduk lengkap dengan aksesoris set 22.00 2,640,313.00 58,086,886.00
2 Wastafel gantung lengkap dengan aksesoris set 2.00 2,803,697.00 5,607,394.00
3 Wastafel under counter lengkap dengan aksesoris set 22.00 1,965,019.00 43,230,418.00
4 Cove ligth wastafel bh 22.00 373,317.00 8,212,974.00
5 Kaca cermin m² 29.35 344,600.00 10,114,010.00
6 Jet washer set 22.00 624,400.00 13,736,800.00
7 Tissue holder bh 22.00 453,420.00 9,975,240.00
8 Floor drain bh 49.00 389,382.00 19,079,718.00
9 Hand dryer bh - 5,094,197.00 -
10 Memasang kran dinding Ø 1/2" bh - 303,391.00 -
11 Hand railling penyandang cacat (stainless steel) bh 34.00 556,307.00 18,914,438.00
13 Hand shower lengkap dengan aksesories set 19.00 1,301,048.00 24,719,912.00
14 Towel bar bh 17.00 589,933.00 10,028,861.00
17 Soap Holder bh 17.00 507,000.00 8,619,000.00
15 Memasang cubical toilet type T, dua daun pintu -
16 - Tempered laminated glass tebal 12 mm lengkap Unit 2.00 18,953,026.00 37,906,052.00
12 Zink satu lubang + accessories set 1.00 1,452,756.00 1,452,756.00
Service Sink Set 2.00 8,120,000.00 16,240,000.00
Slop Sink Set 2.00 11,750,000.00 23,500,000.00
-
-
E. LANTAI TIGA -
1 Kloset duduk lengkap dengan aksesoris set 23.00 2,640,313.00 60,727,199.00
2 Wastafel gantung lengkap dengan aksesoris set 2.00 2,803,697.00 5,607,394.00
3 Wastafel under counter lengkap dengan aksesoris set 23.00 1,965,019.00 45,195,437.00
4 Cove ligth wastafel bh 23.00 373,317.00 8,586,291.00
5 Kaca cermin m² 30.77 344,600.00 10,603,342.00
6 Jet washer set 23.00 624,400.00 14,361,200.00
7 Tissue holder bh 23.00 453,420.00 10,428,660.00
8 Floor drain bh 43.00 389,382.00 16,743,426.00
9 Hand dryer bh - 5,094,197.00 -
10 Memasang kran dinding Ø 1/2" bh - 303,391.00 -
11 Hand railling penyandang cacat (stainless steel) bh 34.00 556,307.00 18,914,438.00
13 Hand shower lengkap dengan aksesories set 20.00 1,301,048.00 26,020,960.00
14 Towel bar bh 18.00 589,933.00 10,618,794.00
Soap Holder bh 18.00 507,000.00 9,126,000.00
Memasang cubical toilet type T, dua daun pintu -
- Tempered laminated glass tebal 12 mm lengkap Unit 2.00 18,953,026.00 37,906,052.00
12 Zink satu lubang + accessories set 1.00 1,452,756.00 1,452,756.00

SUB TOTAL PEKERJAAN PENGADAAN & PEMASANGAN SANITAIR 870,996,572.00

3.6. PEKERJAAN PENGECATAN


A. LOWER GROUND
1 Pengecatan dinding emultion (interior) m² 945.59 17,460.00 16,510,001.40
2 Pengecatan dinding dustproof (interior) m² 805.02 27,281.00 21,961,750.62
3 Pengecatan plafond emultion (interior) m² 660.93 17,460.00 11,539,837.80
4 Pengecatan plafond dustproof (interior) m² 1,436.29 27,281.00 39,183,427.49
-
B. GROUND FLOOR -
1 Pengecatan dinding emultion (interior) m² 2,871.03 17,460.00 50,128,183.80
2 Pengecatan dinding dustproof (interior) m² 105.19 27,281.00 2,869,688.39
3 Pengecatan plafond emultion (interior) m² 1,510.50 17,460.00 26,373,330.00
4 Pengecatan plafond dustproof (interior) m² 54.88 27,281.00 1,497,181.28
-
C. LANTAI SATU -
1 Pengecatan dinding emultion (interior) m² 1,495.44 17,460.00 26,110,382.40
2 Pengecatan dinding dustproof (interior) m² 75.56 27,281.00 2,061,352.36
3 Pengecatan dinding acrylic anti bakteri (epoxy) m² 367.29 60,018.00 22,044,011.22
4 Pengecatan plafond emultion (interior) m² 1,410.86 17,460.00 24,633,615.60
5 Pengecatan plafond dustproof (interior) m² 54.88 27,281.00 1,497,181.28
6 Pengecatan plafond acrylic anti bakteri (epoxy) m² 83.05 60,018.00 4,984,494.90
-
D. LANTAI DUA -
1 Pengecatan dinding emultion (interior) m² 2,242.56 17,460.00 39,155,097.60
2 Pengecatan dinding dustproof (interior) m² 151.12 27,281.00 4,122,704.72
3 Pengecatan dinding acrylic anti bakteri (epoxy) m² 41.57 60,018.00 2,494,948.26
4 Pengecatan plafond emultion (interior) m² 1,464.59 17,460.00 25,571,741.40
5 Pengecatan plafond dustproof (interior) m² 51.08 27,281.00 1,393,513.48
6 Pengecatan plafond acrylic anti bakteri (epoxy) m² 14.01 60,018.00 840,852.18
-
E. LANTAI TIGA 55.58 -
1 Pengecatan dinding emultion (interior) m² 1,752.85 17,460.00 30,604,761.00
2 Pengecatan dinding dustproof (interior) m² 151.12 27,281.00 4,122,704.72
3 Pengecatan dinding acrylic anti bakteri (epoxy) m² 41.57 60,018.00 2,494,948.26

Pek. Standart Gedung D - page 18 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

4 Pengecatan plafond emultion (interior) m² 1,236.13 17,460.00 21,582,829.80


5 Pengecatan plafond dustproof (interior) m² 51.08 27,281.00 1,393,513.48
6 Pengecatan plafond acrylic anti bakteri (epoxy) m² 14.01 60,018.00 840,852.18
-
F. LANTAI RUANG MESIN LIFT
1 Pengecatan dinding dustproof (interior) m² 95.97 17,460.00 1,675,636.20
2 Pengecatan plafond dustproof (interior) m² 50.29 27,281.00 1,371,961.49
SUB TOTAL PEKERJAAN PENGECATAN 389,060,503.31

3.7. PEKERJAAN PENGADAAN & PEMASANGAN RAILLING


A. LOWER GROUND
1 Railling tangga pipa BSP ø 1"&2" fin cat synthetic m' 48.31 631,768.00 30,520,712.08
-
B. GROUND FLOOR -
1 Railling tangga pipa BSP ø 1"&2" fin cat synthetic m' 57.05 631,768.00 36,042,364.40
-
C. LANTAI SATU -
1 Railling tangga pipa BSP ø 1"&2" fin cat synthetic m' 48.38 631,768.00 30,564,935.84
-
D. LANTAI DUA -
1 Railling tangga pipa BSP ø 1"&2" fin cat synthetic m' 47.08 631,768.00 29,743,637.44
-
E. LANTAI TIGA -
1 Railling tangga pipa BSP ø 1"&2" fin cat synthetic m' 34.84 631,768.00 22,010,797.12

SUB TOTAL PEKERJAAN PENGADAAN & PEMASANGAN RAILLING 148,882,446.88

IV. PEKERJAAN PLUMBING


4.1. PEKERJAAN AIR BERSIH
1. Lower Ground
a. Gate Valve :
- Diameter 32 mm bh 1.00 433,900.00 433,900.00
- Diameter 25 mm bh 1.00 302,100.00 302,100.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 1.00 62,500.00 62,500.00
- Diameter 25 mm m¹ 18.00 42,500.00 765,000.00
- Diameter 20 mm m¹ 37.00 28,300.00 1,047,100.00
- -
2. Ground Floor - -
a. Gate Valve : - -
- Diameter 32 mm bh 3.00 433,900.00 1,301,700.00
- Diameter 25 mm bh 3.00 302,100.00 906,300.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 5.00 62,500.00 312,500.00
- Diameter 25 mm m¹ 87.00 42,500.00 3,697,500.00
- Diameter 20 mm m¹ 168.00 28,300.00 4,754,400.00
- -
3. Lantai.1 - -
a. Gate Valve : - -
- Diameter 32 mm bh 8.00 433,900.00 3,471,200.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 11.00 62,500.00 687,500.00
- Diameter 25 mm m¹ 55.00 42,500.00 2,337,500.00
- Diameter 20 mm m¹ 154.00 28,300.00 4,358,200.00
- -
4. Lantai,2 - -
a. Gate Valve : - -
- Diameter 32 mm bh 1.00 433,900.00 433,900.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 8.00 62,500.00 500,000.00
- Diameter 25 mm m¹ 94.00 42,500.00 3,995,000.00
- Diameter 20 mm m¹ 261.00 28,300.00 7,386,300.00
- -
5. Lantai.3 - -
a. Gate Valve : - -
- Diameter 32 mm bh 1.00 433,900.00 433,900.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 8.00 62,500.00 500,000.00
- Diameter 25 mm m¹ 94.00 42,500.00 3,995,000.00
- Diameter 20 mm m¹ 261.00 28,300.00 7,386,300.00
- -
6. LANTAI - ATAP - -
a. Pemipaan Polipropeline PN-10 - -
- Pipa Distribusi di lantai atap - -
PPR dia. 50 mm m' 115.00 138,200.00 15,893,000.00
- -
7. SHAFT - -
a. Pemipaan Polipropeline PN-10 - -
- PPR dia. 50 mm m' 46.00 138,200.00 6,357,200.00
- Gate valve dia. 50 mm bh 4.00 797,500.00 3,190,000.00
c. AAV / Water Hammer bh 4.00 2,889,900.00 11,559,600.00

Pek. Standart Gedung D - page 19 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

SUB TOTAL PEKERJAAN AIR BERSIH 86,067,600.00

4.2. PEKERJAAN AIR RECYCLING


1. Lower Ground
a. Gate Valve :
- Diameter 32 mm bh 1.00 433,900.00 433,900.00
- Diameter 25 mm bh 1.00 302,100.00 302,100.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 1.00 62,500.00 62,500.00
- Diameter 25 mm m¹ 17.00 42,500.00 722,500.00
- Diameter 20 mm m¹ 30.00 28,300.00 849,000.00
- -
2. Ground Floor - -
a. Gate Valve : - -
- Diameter 32 mm bh 1.00 433,900.00 433,900.00
- Diameter 25 mm bh 1.00 302,100.00 302,100.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 1.00 62,500.00 62,500.00
- Diameter 25 mm m¹ 54.00 42,500.00 2,295,000.00
- Diameter 20 mm m¹ 51.00 28,300.00 1,443,300.00
- -
3. Lantai.1 - -
a. Gate Valve : - -
- Diameter 32 mm bh 1.00 433,900.00 433,900.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 1.00 62,500.00 62,500.00
- Diameter 25 mm m¹ 5.00 42,500.00 212,500.00
- Diameter 20 mm m¹ 14.00 28,300.00 396,200.00
- -
4. Lantai.2 - -
a. Gate Valve : - -
- Diameter 40 mm bh 1.00 535,600.00 535,600.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 8.00 62,500.00 500,000.00
- Diameter 25 mm m¹ 78.00 42,500.00 3,315,000.00
- Diameter 20 mm m¹ 141.00 28,300.00 3,990,300.00
- -
5. Lantai.3 - -
a. Gate Valve : - -
- Diameter 25 mm bh 1.00 302,100.00 302,100.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 32 mm m¹ 8.00 62,500.00 500,000.00
- Diameter 25 mm m¹ 78.00 42,500.00 3,315,000.00
- Diameter 20 mm m¹ 141.00 28,300.00 3,990,300.00
- -
6. Lantai. Atap - -
a. Gate Valve : - -
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 50 mm m' 115.00 138,200.00 15,893,000.00
- -
7. SHAFT - -
a. Pemipaan Polipropeline PN-10 - -
- PPR dia. 50 mm m' 46.00 138,200.00 6,357,200.00
- Gate valve dia. 50 mm bh 4.00 797,500.00 3,190,000.00
b. AAV / Water Hammer bh 4.00 2,889,900.00 11,559,600.00
SUB TOTAL PEKERJAAN AIR RECYCLING 61,460,000.00

4.3. PEKERJAAN AIR PANAS


1. Lower Ground
a. Gate Valve :
- Diameter 25 mm bh 1.00 302,100.00 302,100.00
b. Pemipaan Polypropelyne PN.20 : - -
- Diameter 25 mm m¹ 10.00 61,100.00 611,000.00
- Diameter 20 mm m¹ 8.00 39,200.00 313,600.00
- -
2. Ground Floor - -
a. Gate Valve : - -
- Diameter 25 mm bh 1.00 302,100.00 302,100.00
b. Pemipaan Polypropelyne PN.20 : - -
- Diameter 25 mm m¹ 10.00 61,100.00 611,000.00
- Diameter 20 mm m¹ 8.00 39,200.00 313,600.00
- -
3. Lantai.1 - -
a. Gate Valve : - -
- Diameter 25 mm bh 1.00 302,100.00 302,100.00
b. Pemipaan Polypropelyne PN.20 : - -
- Diameter 25 mm m¹ 10.00 61,100.00 611,000.00
- Diameter 20 mm m¹ 8.00 39,200.00 313,600.00
- -
4. Lantai.2 - -
a. Pemipaan Polypropelyne PN.20 : - -

Pek. Standart Gedung D - page 20 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

- Diameter 32 mm m¹ 8.00 90,000.00 720,000.00


- Diameter 25 mm m¹ 72.00 61,100.00 4,399,200.00
- Diameter 20 mm m¹ 178.00 39,200.00 6,977,600.00
- -
5. Lantai.3 - -
a. Pemipaan Polypropelyne PN.20 : - -
- Diameter 32 mm m¹ 8.00 90,000.00 720,000.00
- Diameter 25 mm m¹ 72.00 61,100.00 4,399,200.00
- Diameter 20 mm m¹ 178.00 39,200.00 6,977,600.00
- -
6. Lantai. Atap - -
a. Pemipaan Polypropelyne PN.20 supply dari gedung BTC - -
- Diameter 50 mm m¹ 60.00 797,500.00 47,850,000.00
b. Pemipaan Polypropelyne PN.10 : - -
- Diameter 50 mm m¹ 115.00 207,200.00 23,828,000.00
- -
7. SHAFT - -
a. Pemipaan Polipropeline PN-10 - -
- PPR dia. 50 mm m' 42.00 207,200.00 8,702,400.00
- Gate valve dia. 50 mm bh 4.00 797,500.00 3,190,000.00
b. AAV / Water Hammer bh 4.00 2,889,900.00 11,559,600.00
SUB TOTAL PEKERJAAN AIR PANAS 123,003,700.00

4.4. PEKERJAAN AIR KOTOR


1. LOWER GROUND
a. Bak Netralisasi unit 1.00 918,900.00 918,900.00
b. Sumpit Air Kotor (Sewage pit) - -
- Bak sumpit ( pekerjaan Arsitektur ) bh 2.00 5,743,300.00 11,486,600.00
- Pompa Sumpit ( Submersible Pump ) 1 set 2 P set 3.00 74,709,400.00 224,128,200.00
- Bak kontrol bh 1.00 918,900.00 918,900.00
c. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - -
- PVC diameter 100 mm m¹ 177.00 166,300.00 29,435,100.00
- FCO diameter 100 mm bh 8.00 187,200.00 1,497,600.00
b. Pemipaan Air kotor Cair PVC Kelas 10 kg/cm2 : - -
- PVC diameter 100 mm m¹ 120.00 166,300.00 19,956,000.00
- PVC Diameter 80 mm m¹ 47.00 108,800.00 5,113,600.00
- PVC Diameter 65 mm m¹ 26.00 82,600.00 2,147,600.00
- PVC Diameter 50 mm m¹ 18.00 60,700.00 1,092,600.00
- FCO diameter 80 mm bh 4.00 150,500.00 602,000.00
- FCO diameter 65 mm bh 1.00 136,700.00 136,700.00
- FCO diameter 50 mm bh 2.00 122,900.00 245,800.00
C. Pemipaan Vent PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 32 mm m¹ 34.00 39,700.00 1,349,800.00
- -
- -
2. GROUND FLOOR - -
a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - -
- PVC diameter 100 mm m¹ 76.00 166,300.00 12,638,800.00
- FCO diameter 100 mm bh 10.00 187,200.00 1,872,000.00
b. Pemipaan Air kotor Cair PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 80 mm m¹ 46.00 108,800.00 5,004,800.00
- PVC Diameter 65 mm m¹ 76.00 82,600.00 6,277,600.00
- PVC Diameter 50 mm m¹ 111.00 60,700.00 6,737,700.00
- FCO diameter 80 mm bh 10.00 150,500.00 1,505,000.00
- FCO diameter 65 mm bh 12.00 136,700.00 1,640,400.00
- FCO diameter 50 mm bh 6.00 122,900.00 737,400.00
c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 32 mm m¹ 184.00 39,700.00 7,304,800.00
- -
3. LANTAI.1 - -
a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - -
- PVC diameter 100 mm m¹ 20.00 166,300.00 3,326,000.00
- FCO diameter 100 mm bh 3.00 187,200.00 561,600.00
b. Pemipaan Air kotor Cair PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 65 mm m¹ 60.00 82,600.00 4,956,000.00
- PVC Diameter 50 mm m¹ 105.00 60,700.00 6,373,500.00
- FCO diameter 80 mm bh 9.00 150,500.00 1,354,500.00
- FCO diameter 65 mm bh 9.00 136,700.00 1,230,300.00
- FCO diameter 50 mm bh 3.00 122,900.00 368,700.00
c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 32 mm m¹ 151.00 39,700.00 5,994,700.00
- -
4. LANTAI. - 2 - -
a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - -
- PVC diameter 100 mm m¹ 153.00 166,300.00 25,443,900.00
- FCO diameter 100 mm bh 40.00 187,200.00 7,488,000.00
b. Pemipaan Air kotor Cair PVC Kelas 10 kg/cm2 : - -
- PVC diameter 80 mm m¹ 49.00 108,800.00 5,331,200.00
- PVC Diameter 65 mm m¹ 92.00 82,600.00 7,599,200.00
- PVC Diameter 50 mm m¹ 95.00 60,700.00 5,766,500.00
- FCO diameter 80 mm bh 17.00 150,500.00 2,558,500.00

Pek. Standart Gedung D - page 21 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

- FCO diameter 65 mm bh 24.00 136,700.00 3,280,800.00


- FCO diameter 50 mm bh 5.00 122,900.00 614,500.00
c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 32 mm m¹ 176.00 39,700.00 6,987,200.00
- -
5. LANTAI.- 3 - -
a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - -
- PVC diameter 100 mm m¹ 153.00 166,300.00 25,443,900.00
- FCO diameter 100 mm bh 40.00 187,200.00 7,488,000.00
b. Pemipaan Air kotor Cair PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 80 mm m¹ 49.00 108,800.00 5,331,200.00
- PVC Diameter 65 mm m¹ 92.00 82,600.00 7,599,200.00
- PVC Diameter 50 mm m¹ 95.00 60,700.00 5,766,500.00
- FCO diameter 100 mm bh 17.00 187,200.00 3,182,400.00
- FCO diameter 65 mm bh 24.00 136,700.00 3,280,800.00
- FCO diameter 50 mm bh 5.00 122,900.00 614,500.00
c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 32 mm m¹ 176.00 39,700.00 6,987,200.00
- -
6. LANTAI.- Atap R. MESIN - -
a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - -
- PVC diameter 100 mm m¹ 12.00 166,300.00 1,995,600.00
- FCO diameter 100 mm bh 3.00 187,200.00 561,600.00
b. Pemipaan Air kotor Cair PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 80 mm m¹ 6.00 108,800.00 652,800.00
- PVC Diameter 65 mm m¹ 5.00 82,600.00 413,000.00
- PVC Diameter 50 mm m¹ 6.00 60,700.00 364,200.00
- FCO diameter 65 mm bh 1.00 136,700.00 136,700.00
c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - -
- PVC Diameter 32 mm m¹ 16.00 39,700.00 635,200.00
- -
7. SHAFT - -
a. Pemipaan Air kotoran PVC Kelas 10 kg/cm2 : - -
- PVC diameter 100 mm m¹ 36.00 166,300.00 5,986,800.00
b. Pemipaan Air kotor PVC Kelas 10 kg/cm2 : - -
- PVC diameter 80 mm m¹ 36.00 108,800.00 3,916,800.00
c. Pemipaan Air kotor vent PVC Kelas 10 kg/cm2 : - -
- PVC diameter 50 mm m¹ 40.00 60,700.00 2,428,000.00
d. Vent Out ( VO ) bh 2.00 136,700.00 273,400.00
SUB TOTAL PEKERJAAN AIR KOTOR 515,040,800.00

4.5. PEKERJAAN TALANG AIR HUJAN


a. Pemipaan PVC Kelas 10 kg/cm2 :
- Piipa tegak
PVC diameter 200 mm m¹ 36.00 520,900.00 18,752,400.00
- Piipa mendatar - -
PVC diameter 200 mm m¹ 44.00 520,900.00 22,919,600.00
PVC diameter 150 mm m¹ 56.00 328,100.00 18,373,600.00
PVC diameter 100 mm m¹ 36.00 166,300.00 5,986,800.00
b. Roof Drain : - -
- RD diameter 100 mm bh 16.00 240,100.00 3,841,600.00

SUB TOTAL PEKERJAAN TALANG AIR HUJAN 69,874,000.00

4.6 PEKERJAAN PIPA AIR BUANGAN DAPUR


a. Pemipaan Acoustic (khusus anti lemak) :
- Pipa Acoustic diameter 160 mm (Ultra DB) 39.00 762,500.00 29,737,500.00
- Pipa Acoustic diameter 110 mm (Ultra DB) 40.00 416,250.00 16,650,000.00
- Pipa Acoustic diameter 75mm (Ultra DB) 28.00 232,200.00 6,501,600.00
- Pipa Acoustic diameter 50mm (Ultra DB) 65.00 153,000.00 9,945,000.00
- Fitting Acoustic (Ultra DB) 40.00 450,000.00 18,000,000.00
- grease trap 1.00 5,000,000.00 5,000,000.00

SUB TOTAL PEKERJAAN PIPA AIR BUANGAN DAPUR 85,834,100.00

4.7 PEKERJAAN PIPA AIR BUANGAN LAB


a. Pemipaan Vulcathene (khusus anti chemical) :
- Pipa Vulcathene diameter 100 mm 39.00 762,500.00 29,737,500.00
- Pipa Vulcathene diameter 75 mm 40.00 416,250.00 16,650,000.00
- Pipa Vulcathene diameter 75 mm 28.00 232,200.00 6,501,600.00
- Pipa Vulcathene diameter 50mm 65.00 153,000.00 9,945,000.00
- Fitting Vulcathene 40.00 450,000.00 18,000,000.00

SUB TOTAL PEKERJAAN PIPA AIR BUANGAN LAB 80,834,100.00

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1. PEKERJAAN PANEL DAN KABEL FEEDER
A. LOWER GROUND
1 Panel Listrik
- SDP -LG unit 1.00 15,173,900.00 15,173,900.00
- LP - LG unit 1.00 5,864,000.00 5,864,000.00

Pek. Standart Gedung D - page 22 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

- PP - LG unit 1.00 5,580,200.00 5,580,200.00


- PP - AC IU LG unit 1.00 7,573,700.00 7,573,700.00
2 Kabel Feeder - -
- Dari MDP-A ke SDP-LG , NYY 4 x 70 mm2 m¹ 15.00 449,000.00 6,735,000.00
- Dari SDP - LG ke LP - LG, NYY 4 x 6 mm2 m¹ 15.00 45,400.00 681,000.00
- Dari SDP - LG ke PP - LG, NYY 4 x 25 mm2 m¹ - 170,600.00 -
Dari SDP - LG ke PP - LG, NYY 4 x 6 mm2 15.00 45,400.00 681,000.00
- Dari SDP-LG ke PP - AC IU.LG, NYY 4 x 35 mm2 m¹ - 232,800.00 -
Dari SDP-LG ke PP - AC IU.LG, NYY 4 x 16 mm2 15.00 111,200.00 1,668,000.00
-
B. GROUND FLOOR -
1 Panel Listrik -
- MDP - D unit 1.00 205,983,200.00 205,983,200.00
- LP - GF unit 1.00 6,050,600.00 6,050,600.00
- PP - GF unit 1.00 7,760,400.00 7,760,400.00
- PP - AC IU GF unit 1.00 6,028,200.00 6,028,200.00
2 Kabel Feeder - -
- Dari LVMDP-1 ke MDP - A, NYFGbY 3 x 4 x 30 m¹ - 5,761,700.00 -
- Dari MDP - A ke LP- GF, NYY 4 x 6 mm2 m¹ 15.00 45,400.00 681,000.00
- Dari MDP - A ke PP- GF, NYY 4 x 25 mm2 m¹ - 170,600.00 -
Dari MDP - A ke PP- GF, NYY 4 x 16 mm2 15.00 111,200.00 1,668,000.00
- Dari MDP - GF ke PP- AC.IU.GF, NYY 4 x 10 mm m¹ - 71,100.00 -
Dari MDP - GF ke PP- AC.IU.GF, NYY 4 x 6 mm2 15.00 45,400.00 681,000.00
-
C. LANTAI SATU -
1 Panel Listrik -
- SDP -1 unit 1.00 15,166,400.00 15,166,400.00
- LP - 1 unit 1.00 6,050,600.00 6,050,600.00
- PP - 1 unit 1.00 7,760,400.00 7,760,400.00
- PP - AC IU 1 unit 1.00 7,170,600.00 7,170,600.00
2 Kabel Feeder - -
- Dari MDP-A ke SDP-1 , NYY 4 x 70 mm2 m¹ 15.00 449,000.00 6,735,000.00
- Dari SDP - 1 ke LP - 1, NYY 4 x 6 mm2 m¹ 15.00 45,400.00 681,000.00
- Dari SDP - 1 ke PP - 1, NYY 4 x 25 mm2 m¹ - 170,600.00 -
Dari SDP - 1 ke PP - 1, NYY 4 x 16 mm2 15.00 45,400.00 681,000.00
- Dari SDP-1 ke PP - AC IU.1, NYY 4 x 10 mm2 m¹ 15.00 71,100.00 1,066,500.00
-
D. LANTAI DUA -
1 Panel Listrik -
- SDP - 2 unit 1.00 16,025,100.00 16,025,100.00
- LP - 2 unit 1.00 6,610,600.00 6,610,600.00
- PP - 2 unit 1.00 14,296,900.00 14,296,900.00
- PP - AC IU 2 unit 1.00 6,028,200.00 6,028,200.00
2 Kabel Feeder - -
- Dari MDP-A ke SDP -2, NYY 4 X 95 mm2 m¹ - 602,700.00 -
Dari MDP-A ke SDP -2, NAYY 4 X 150 mm2 25.00 548,900.00 13,722,500.00
- Dari SDP - 2 ke LP - 2, NYY 4 x 10 mm2 m¹ 15.00 71,100.00 1,066,500.00
- Dari SDP - 2 ke PP -2, NYY 4 x 95 mm2 m¹ - 602,700.00 -
Dari SDP-2 ke PP -2, NAYY 4 X 150 mm2 15.00 548,900.00 8,233,500.00
- Dari SDP-2 ke PP - AC IU.2, NYY 4 x 6 mm2 m¹ 15.00 45,400.00 681,000.00
-
E. LANTAI TIGA -
1 Panel Listrik -
- SDP - 3 unit 1.00 85,655,600.00 85,655,600.00
- LP - 3 unit 1.00 6,625,500.00 6,625,500.00
- PP - 3 unit 1.00 14,296,900.00 14,296,900.00
- PP - AC.3 unit 1.00 27,284,300.00 27,284,300.00
- PP - LF.D unit 1.00 9,821,100.00 9,821,100.00
2 Kabel Feeder - -
- Dari MDP - A ke SDP -3, NYY 2 X 1 X 185 mm2 m¹ - 557,500.00 -
Dari MDP - A ke SDP -3, NAYY 3 X (4 X 150 mm2) 35.00 1,646,700.00 57,634,500.00
- Dari SDP - 3 ke LP - 3, NYY 4 x 10 mm2 m¹ 15.00 71,100.00 1,066,500.00
- Dari SDP - 3 ke PP -3, NYY 4 x 95 mm2 m¹ - 602,700.00 -
Dari SDP - 3 ke PP -3, NAYY 4 x 150 mm2 15.00 548,900.00 8,233,500.00
- Dari SDP - 3 ke PP - AC.3, NYY 2x4(1 x 150) m m¹ - 1,813,000.00 -
Dari SDP - 3 ke PP - AC.3, NAYY 2x(4 x 150) mm2 15.00 1,097,800.00 16,467,000.00
- Dari LVMDP ke PP - LF.D, FRC 4 x70 mm2 m¹ 70.00 640,400.00 44,828,000.00
SUB TOTAL PEKERJAAN PANEL DAN KABEL FEEDER 656,697,900.00

5.2. PEKERJAAN TITIK INSTALASI DAYA DAN ARMATUR PENERANGAN


A. LANTAI LOWER GROUND
1 Saklar dan Stop kontak
- Saklar tunggal bh 10.00 46,500.00 465,000.00
- Saklar ganda bh 6.00 69,600.00 417,600.00
- Saklar hotel bh 2.00 50,600.00 101,200.00
- Saklar group 6 module bh 2.00 198,400.00 396,800.00
- Stop Kontak 200 W / 16 A bh 25.00 40,700.00 1,017,500.00
- Stop Kontak 500 W / 16 A bh 9.00 40,700.00 366,300.00
2 Titik instalasi - -
- Instalasi penerangan, NYM 3 x 2,5 mm2 dalam ttk 184.00 274,900.00 50,581,600.00
- Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam ttk 25.00 332,100.00 8,302,500.00

Pek. Standart Gedung D - page 23 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

3 Fixtures lampu lengkap dengan armature - -


- Lampu TL LED 2 x 16 W / Louvre - RM bh 47.00 674,900.00 31,720,300.00
- Lampu TL LED 1 x 16 W Dust Proof bh 36.00 492,300.00 17,722,800.00
- Lampu TL LED 1 x 16 W / TKI bh 31.00 306,900.00 9,513,900.00
- Lampu TL LED 1 x 16 W Dilengkapi dengan Bat bh 24.00 1,100,900.00 26,421,600.00
- Lampu TL LED 1 x 8 W / Balk bh 2.00 179,700.00 359,400.00
- Lampu Down Light LED 12 W bh 19.00 160,200.00 3,043,800.00
- Lampu Down Light LED 6 W bh 1.00 110,500.00 110,500.00
- Lampu LED 3W/M bh 24.00 1,045,300.00 25,087,200.00
- -
- -
B. GROUND FLOOR - -
1 Saklar dan Stop kontak - -
- Saklar tunggal bh 35.00 46,500.00 1,627,500.00
- Saklar ganda bh 7.00 69,600.00 487,200.00
- Saklar hotel bh 2.00 50,600.00 101,200.00
- Saklar group 4 module bh 2.00 138,000.00 276,000.00
- -
- Stop Kontak 350 W / 16 A bh 4.00 40,700.00 162,800.00
- Stop Kontak 200 W / 16 A Digantung untuk Pr bh 7.00 40,700.00 284,900.00
2 Titik instalasi - -
- Instalasi penerangan, NYM 3 x 2,5 mm2 dalam ttk 314.00 274,900.00 86,318,600.00
- Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam ttk 11.00 332,100.00 3,653,100.00
3 Fixtures lampu lengkap dengan armature - -
- Lampu TL LED 2 x 16 W / Louvre - RM bh 3.00 674,900.00 2,024,700.00
- Lampu TL LED 2 x 16W Prismatic bh 61.00 758,900.00 46,292,900.00
- Lampu TL LED 1 x 16 W / TKI bh 2.00 306,900.00 613,800.00
- Lampu TL LED 1 x 8 W / Balk bh 2.00 179,700.00 359,400.00
- Lampu Down Light LED 12 W bh 99.00 160,200.00 15,859,800.00
- Lampu Down Light LED 6 W bh 3.00 110,500.00 331,500.00
- Lampu LED 3W/M bh 144.00 1,045,300.00 150,523,200.00
- -
- -
C. LANTAI SATU - -
1 Saklar dan Stop kontak - -
- Saklar tunggal bh 22.00 46,500.00 1,023,000.00
- Saklar ganda bh 8.00 69,600.00 556,800.00
- Saklar hotel bh 2.00 50,600.00 101,200.00
- Saklar group 6 module bh 2.00 198,400.00 396,800.00
- Stop Kontak 200 W / 16 A bh 83.00 40,700.00 3,378,100.00
- Stop Kontak 500 W / 16 A bh 9.00 40,700.00 366,300.00
- Stop Kontak 200 W / 16 A Digantung untuk Pr bh 6.00 40,700.00 244,200.00
2 Titik instalasi - -
- Instalasi penerangan, NYM 3 x 2,5 mm2 dalam ttk 381.00 274,900.00 104,736,900.00
- Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam ttk 98.00 332,100.00 32,545,800.00
3 Fixtures lampu lengkap dengan armature - -
- Lampu TL LED 2 x 16W Prismatic bh 87.00 758,900.00 66,024,300.00
- Lampu TL LED 1 x 16 W / TKI bh 3.00 306,900.00 920,700.00
- Lampu TL LED 1 x 8 W / Balk bh 2.00 179,700.00 359,400.00
- Lampu Down Light LED 12 W bh 97.00 160,200.00 15,539,400.00
- Lampu LED 3W/M bh 192.00 1,045,300.00 200,697,600.00
- -
- -
D. LANTAI DUA - -
1 Saklar dan Stop kontak - -
- Saklar tunggal bh 45.00 46,500.00 2,092,500.00
- Saklar ganda bh 22.00 69,600.00 1,531,200.00
- Saklar hotel bh 2.00 50,600.00 101,200.00
- Saklar group 4 module bh 1.00 138,000.00 138,000.00
- Stop Kontak 200 W / 16 A bh 354.00 40,700.00 14,407,800.00
- Stop Kontak 500 W / 16 A bh 3.00 40,700.00 122,100.00
2 Saklar dan Stop kontak ICU - -
- Stop Kontak 200 W / 16 A bh 86.00 40,700.00 3,500,200.00
3 Saklar dan Stop kontak Hemodealisa - -
- Stop Kontak 200 W / 16 A bh 24.00 40,700.00 976,800.00
- Stop Kontak 2000 W / 16 A bh 5.00 40,700.00 203,500.00
4 Titik instalasi - -
- Instalasi penerangan, NYM 3 x 2,5 mm2 dalam ttk 277.00 274,900.00 76,147,300.00
- Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam ttk 357.00 332,100.00 118,559,700.00
5 Fixtures lampu lengkap dengan armature - -
- Lampu TL LED 2 x 16 W / Louvre - RM bh 13.00 674,900.00 8,773,700.00
- Lampu TL LED 2 x 16W Prismatic bh 89.00 758,900.00 67,542,100.00
- Lampu TL LED 1 x 16 W / TKI bh 4.00 306,900.00 1,227,600.00
- Lampu TL LED 1 x 8 W / Balk bh 5.00 179,700.00 898,500.00
- Lampu TL LED 1 x 8 W / RMO dipasang pada C bh 71.00 236,100.00 16,763,100.00
- Lampu Down Light LED 12 W bh 58.00 160,200.00 9,291,600.00
- Lampu Down Light LED 9 W bh 10.00 110,500.00 1,105,000.00
- Lampu Down Light LED 6 W bh 27.00 110,500.00 2,983,500.00
- -
- -
E. LANTAI TIGA - -

Pek. Standart Gedung D - page 24 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT VOL
(Rp.) (Rp.)

1 Saklar dan Stop kontak - -


- Saklar tunggal bh 62.00 46,500.00 2,883,000.00
- Saklar ganda bh 39.00 69,600.00 2,714,400.00
- Saklar hotel bh 3.00 50,600.00 151,800.00
- Saklar group 4 module bh 2.00 138,000.00 276,000.00
- Stop Kontak 200 W / 16 A bh 357.00 40,700.00 14,529,900.00
- Stop Kontak 500 W / 16 A bh 3.00 40,700.00 122,100.00
2 Titik instalasi - -
- Instalasi penerangan, NYM 3 x 2,5 mm2 dalam ttk 277.00 274,900.00 76,147,300.00
- Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam ttk 360.00 332,100.00 119,556,000.00
3 Fixtures lampu lengkap dengan armature - -
- Lampu TL LED 2 x 16 W / Louvre - RM bh 15.00 674,900.00 10,123,500.00
- Lampu TL LED 2 x 16W Prismatic bh 95.00 758,900.00 72,095,500.00
- Lampu TL LED 1 x 16 W / TKI bh 4.00 306,900.00 1,227,600.00
- Lampu TL LED 1 x 8 W / Balk bh 5.00 179,700.00 898,500.00
- Lampu TL LED 1 x 8 W / RMO dipasang pada C bh 70.00 236,100.00 16,527,000.00
- Lampu Down Light LED 12 W bh 61.00 160,200.00 9,772,200.00
- Lampu Down Light LED 9 W bh 4.00 110,500.00 442,000.00
- Lampu Down Light LED 6 W bh 23.00 110,500.00 2,541,500.00
- -
- -
F. LANTAI DAK ATAP - -
1 Saklar dan Stop kontak - -
- Saklar hotel bh 2.00 50,600.00 101,200.00
2 Titik instalasi - -
- Instalasi penerangan, NYM 3 x 2,5 mm2 dalam ttk 4.00 274,900.00 1,099,600.00
3 Fixtures lampu lengkap dengan armature - -
- Lampu TL LED 1 x 16 W Dilengkapi dengan Bat bh 4.00 1,100,900.00 4,403,600.00
SUB TOTAL PEKERJAAN TITIK INSTALASI DAYA DAN ARMATUR PENERANGAN 1,573,413,200.00
31,363,417,657.28
TOTAL PEKERJAAN STANDAR GEDUNG D

Pek. Standart Gedung D - page 25 of 51


PEKERJAAN : PEKERJAAN BANGUNAN GEDUNG A
PROYEK : PEMBANGUNAN RS DI SURABAYA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN VOL SAT
(Rp.) (Rp.)

PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
1.1. PEKERJAAN PONDASI TIANG PANCANG
- Tiang Pancang Spun Pile Ø 45 cm - Grade C, panjang 18.00 met 6,063.20 m 488,000.00 2,958,841,600.00
- Cut off Pile 49.00 titik 126,354.00 6,191,346.00
- Actual Loading Test
- Static Vertikal Loading Test 2.00 titik 57,433,413.00 114,866,826.00
- Static Lateral Loading Test 1.00 titik 15,507,022.00 15,507,022.00
- PDA Test 2.00 titik 9,189,346.00 18,378,692.00
SUB TOTAL PEKERJAAN PONDASI TIANG PANCANG 3,113,785,486.00

1.2. DINDING BETON RETAINING WALL RW


- Besi D 16 5,621.07 kg 10,636.00 59,785,700.52
- Besi D 19 9,230.29 kg 10,636.00 98,173,364.44
- Begisting 540.93 m2 105,000.00 56,797,650.00
- Cor Beton K-350 67.62 m3 893,475.00 60,416,779.50
- Waterproofing Integral 135.23liter 25,845.00 3,495,019.35
- Water Profing Bithuthene Sheet 3000 325.58 m2 91,747.00 29,870,988.26
- Pasangan 1/4 bata lengkap plesteran m2 183,176.00 -
- Plesteran semen instan 325.58 m2 60,592.00 19,727,543.36

SUB TOTAL DINDING BETON RETAINING WALL RW 328,267,045.43

II. PEKERJAAN ARSITEK


2.1. PEKERJAAN PENGADAAN & PEMASANGAN PELAPIS DINDING
A. LOWER GROUND
1 Granite polished finish garda pintu lift 33.41 m² 2,044,903.00 68,320,209.23
2 Memasang timber flooring light maple 60.93 m² 442,237.00 26,945,500.41
3 Memasang hospital plint 28.68 m' 80,062.00 2,296,178.16
4 Timber base skirting t. 10 cm 31.10 m' 74,663.00 2,322,019.30
5 Pengecatan cat marka jalan 22,973.00 -
6 Wheel stop car pipa BSP 4" fin. cat 155,070.00 -
7 Dinding border batu granit area wudhu 1.39 m' 1,812,419.00 2,519,262.41
8 Stainless steel satin polished pintu lift 5.79 m² 1,859,005.00 10,763,638.95
-
B. GROUND FLOOR -
1 Granite polished finish garda pintu lift 33.41 m² 2,044,903.00 68,320,209.23
2 Wall guard (Bumper guard) Alumunium Extrude pr 552.63 m' 539,415.00 298,096,911.45
- Cover Vinyl Handrail -
- Endcap Section -
3 Memang lantai andesit 30x30 cm 7.92 m² 172,346.00 1,364,980.32
4 Window sill alumunium penutup curtain wall 106.62 m' 172,346.00 18,375,530.52
5 Stainless steel satin polished pintu lift 5.79 m² 1,859,005.00 10,763,638.95
-
C. LANTAI SATU -
1 Granite polished finish garda pintu lift 33.41 m² 2,044,903.00 68,320,209.23
2 Wall guard (Bumper guard) Alumunium Extrude pr 469.31 m' 539,415.00 253,152,853.65
- Cover Vinyl Handrail -

Pek. Non Standart Gedung D - page 26 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- Endcap Section -
3 Rail guard Alumunium Extrude profil - m' 539,415.00 -
- Cover Vinyl Handrail -
- Endcap Section -
4 Memasang vinyl sheet 83.05 m² 214,801.00 17,839,223.05
5 Memasang hospital plint 648.53 m' 80,062.00 51,922,608.86
6 Plint vinyl sheet (curve base skirting) 25.25 m' 80,062.00 2,021,565.50
7 Window sill alumunium penutup curtain wall 86.05 m' 172,346.00 14,830,373.30
8 Pekerjaan medical track berikut gordyn - m² 367,574.00 -
9 Stainless steel satin polished pintu lift 5.79 m² 1,859,005.00 10,763,638.95
-
D. LANTAI DUA -
1 Granite polished finish garda pintu lift 33.41 m² 2,044,903.00 68,320,209.23
2 Dinding border batu granit area kamar mandi 3.83 m² 1,812,419.00 6,941,564.77
3 Wall guard (Bumper guard) Alumunium Extrude pr 414.82 m' 539,415.00 223,760,130.30
- Cover Vinyl Handrail -
- Endcap Section -
4 Memasang hospital plint 886.08 m' 80,062.00 70,941,336.96
Rail guard Alumunium Extrude profil 189.58 m' 539,415.00 102,262,295.70
- Cover Vinyl Handrail -
- Endcap Section -
5 Allumunium counter top (material ACP) 79.78 m' 172,346.00 13,749,763.88
6 Pekerjaan medical track berikut gordyn - m² 367,574.00 -
7 Stainless steel satin polished pintu lift 5.79 m² 1,859,005.00 10,763,638.95
-
E. LANTAI TIGA -
1 Granite polished finish garda pintu lift 33.41 m² 2,044,903.00 68,320,209.23
2 Dinding border batu granit area kamar mandi 3.83 m² 1,812,419.00 6,941,564.77
3 Wall guard (Bumper guard) Alumunium Extrude pr 463.80 m' 539,415.00 250,180,677.00
- Cover Vinyl Handrail -
- Endcap Section -
4 Memasang vinyl sheet - m² 214,801.00 -
5 Memasang hospital plint 898.31 m' 80,062.00 71,920,495.22
6 Plint vinyl sheet (curve base skirting) - m' 80,062.00 -
7 Allumunium counter top (material ACP) 79.78 m' 80,062.00 6,387,346.36
8 Pekerjaan medical track berikut gordyn - m² 367,574.00 -
9 Stainless steel satin polished pintu lift 5.79 m² 1,859,005.00 10,763,638.95

SUB TOTAL PEKERJAAN PENGADAAN & PEMASANGAN PELAPIS DINDING 1,840,191,422.79

2.3. PEKERJAAN FASADE


1 Pekerjaan acian luar 426.22 m² 82,605.00 35,207,903.10
2 Pengecatan cat weathershield 1,176.06 m² 30,009.00 35,292,384.54
3 Pekerjaan Alumunium Composite Panel, Tebal / Top & 3,161.98 m² 758,420.00 2,398,108,871.60
dengan alumunium skin 0,30 mm coating PVDF Alloy 3003
4 Pekerjaan batu alam - m² 344,600.00 -
SUB TOTAL PEKERJAAN FASADE - 2,468,609,159.24

III. PEKERJAAN PEMADAMAN KEBAKARAN


1. LANTAI - LOWER GROUND
a. Instalasi Hydrant
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm 2.00 Set 5,295,300.00 10,590,600.00
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy 2.00 bh 1,678,200.00 3,356,400.00

Pek. Non Standart Gedung D - page 27 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- Control Valve dia 65 mm K.20 2.00 bh 7,660,700.00 15,321,400.00


- Gate valve dia. 100 mm 1.00 bh 5,704,000.00 5,704,000.00
- Pemipaan utam dari Pipa utama gedung BTC, 30.00 m' 543,900.00 16,317,000.00
- Pemipaan BSP Schedule 40 : - -
Diameter 100 mm 74.00 m¹ 543,900.00 40,248,600.00
Diameter 65 mm 12.00 m¹ 309,500.00 3,714,000.00
b. Instalasi Sprinkler - -
- Pemipaan utam dari Pipa utama gedung BTC, 30.00 m' 543,900.00 16,317,000.00
- Pemipaan BSP Schedule 40 : - -
Diameter 100 mm 24.00 m¹ 543,900.00 13,053,600.00
Diameter 80 mm 12.00 m¹ 386,300.00 4,635,600.00
Diameter 65 mm 12.00 m¹ 309,500.00 3,714,000.00
Diameter 50 mm 5.00 m¹ 197,300.00 986,500.00
Diameter 32 mm 213.00 m¹ 123,900.00 26,390,700.00
Diameter 25 mm 240.00 m¹ 92,500.00 22,200,000.00
Diameter 25 mm ( Flashing ) 12.00 m¹ 92,500.00 1,110,000.00
- Flashing valve diameter 25 mm 2.00 bh 302,100.00 604,200.00
- Head Sprinkler 168.00 bh 54,900.00 9,223,200.00
- Branch Control Valve ( BCV ) - -
- Indicating Valve diameter 100 mm 1.00 bh 2,246,800.00 2,246,800.00
- Test Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Drain Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Water Flow Switch 1.00 bh 4,086,300.00 4,086,300.00
- Plat Orifice diameter 100 mm 1.00 bh 258,500.00 258,500.00
- Sight glass 1.00 bh 1,751,300.00 1,751,300.00
- Pressure Indicator 1.00 bh 668,100.00 668,100.00
- -
2. GROUND FLOOR - -
a. Instalasi Hydrant - -
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm 2.00 Set 5,295,300.00 10,590,600.00
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy 2.00 bh 1,678,200.00 3,356,400.00
- Control Valve dia 65 mm K.20 2.00 bh 7,660,700.00 15,321,400.00
- Pemipaan BSP Schedule 40 : -
Diameter 65 mm 15.00 m¹ 309,500.00 4,642,500.00
b. Instalasi Sprinkler -
- Pemipaan BSP Schedule 40 : -
Diameter 100 mm 24.00 m¹ 543,900.00 13,053,600.00
Diameter 80 mm 12.00 m¹ 386,300.00 4,635,600.00
Diameter 65 mm 12.00 m¹ 309,500.00 3,714,000.00
Diameter 50 mm 5.00 m¹ 197,300.00 986,500.00
Diameter 32 mm 165.00 m¹ 123,900.00 20,443,500.00
Diameter 25 mm 295.00 m¹ 92,500.00 27,287,500.00
Diameter 25 mm ( Flashing ) 12.00 m¹ 92,500.00 1,110,000.00
- Flashing valve diameter 25 mm 2.00 bh 302,100.00 604,200.00
- Head Sprinkler 112.00 bh 54,900.00 6,148,800.00
- Branch Control Valve ( BCV ) - -
- Indicating Valve diameter 100 mm 1.00 bh 2,246,800.00 2,246,800.00
- Test Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Drain Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Water Flow Switch 1.00 bh 4,086,300.00 4,086,300.00
- Plat Orifice diameter 100 mm 1.00 bh 258,500.00 258,500.00
- Sight glass 1.00 bh 1,751,300.00 1,751,300.00
- Pressure Indicator 1.00 bh 668,100.00 668,100.00

Pek. Non Standart Gedung D - page 28 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- -
3. LANTAI - 1 - -
a. Instalasi Hydrant - -
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm 2.00 Set 5,295,300.00 10,590,600.00
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy 2.00 bh 1,678,200.00 3,356,400.00
- Control Valve dia 65 mm K.20 2.00 bh 7,660,700.00 15,321,400.00
- Pemipaan BSP Schedule 40 : - -
Diameter 65 mm 12.00 m¹ 309,500.00 3,714,000.00
b. Instalasi Sprinkler - -
- Pemipaan BSP Schedule 40 : - -
Diameter 100 mm 24.00 m¹ 543,900.00 13,053,600.00
Diameter 80 mm 12.00 m¹ 386,300.00 4,635,600.00
Diameter 65 mm 12.00 m¹ 309,500.00 3,714,000.00
Diameter 50 mm 5.00 m¹ 197,300.00 986,500.00
Diameter 32 mm 116.00 m¹ 123,900.00 14,372,400.00
Diameter 25 mm 325.00 m¹ 92,500.00 30,062,500.00
Diameter 25 mm ( Flashing ) 12.00 m¹ 92,500.00 1,110,000.00
- Flashing valve diameter 25 mm 2.00 bh 302,100.00 604,200.00
- Head Sprinkler 113.00 bh 54,900.00 6,203,700.00
- Branch Control Valve ( BCV ) - -
- Indicating Valve diameter 100 mm 1.00 bh 2,246,800.00 2,246,800.00
- Test Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Drain Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Water Flow Switch 1.00 bh 4,086,300.00 4,086,300.00
- Plat Orifice diameter 100 mm 1.00 bh 258,500.00 258,500.00
- Sight glass 1.00 bh 1,751,300.00 1,751,300.00
- Pressure Indicator 1.00 bh 668,100.00 668,100.00
- -
4. LANTAI - 2 - -
a. Instalasi Hydrant - -
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm 2.00 Set 5,295,300.00 10,590,600.00
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy 8.00 bh 1,678,200.00 13,425,600.00
- Control Valve dia 65 mm K.20 2.00 bh 7,660,700.00 15,321,400.00
- Pemipaan BSP Schedule 40 : - -
Diameter 65 mm 12.00 m¹ 309,500.00 3,714,000.00
b. Instalasi Sprinkler - -
- Pemipaan BSP Schedule 40 : - -
Diameter 100 mm 24.00 m¹ 543,900.00 13,053,600.00
Diameter 80 mm 12.00 m¹ 386,300.00 4,635,600.00
Diameter 65 mm 12.00 m¹ 309,500.00 3,714,000.00
Diameter 50 mm 5.00 m¹ 197,300.00 986,500.00
Diameter 32 mm 150.00 m¹ 123,900.00 18,585,000.00
Diameter 25 mm 274.00 m¹ 92,500.00 25,345,000.00
Diameter 25 mm ( Flashing ) 12.00 m¹ 92,500.00 1,110,000.00
- Flashing valve diameter 25 mm 2.00 bh 302,100.00 604,200.00
- Head Sprinkler 100.00 bh 54,900.00 5,490,000.00
- Branch Control Valve ( BCV ) - -
- Indicating Valve diameter 100 mm 1.00 bh 2,246,800.00 2,246,800.00
- Test Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Drain Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Water Flow Switch 1.00 bh 4,086,300.00 4,086,300.00
- Plat Orifice diameter 100 mm 1.00 bh 258,500.00 258,500.00
- Sight glass 1.00 bh 1,751,300.00 1,751,300.00

Pek. Non Standart Gedung D - page 29 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- Pressure Indicator 1.00 bh 668,100.00 668,100.00


- -
5. LANTAI - 3 - -
a. Instalasi Hydrant - -
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm 2.00 Set 5,295,300.00 10,590,600.00
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy 8.00 bh 1,678,200.00 13,425,600.00
- Control Valve dia 65 mm K.20 2.00 bh 7,660,700.00 15,321,400.00
- Pemipaan BSP Schedule 40 : - -
Diameter 65 mm 12.00 m¹ 309,500.00 3,714,000.00
b. Instalasi Sprinkler - -
- Pemipaan BSP Schedule 40 : - -
Diameter 100 mm 24.00 m¹ 543,900.00 13,053,600.00
Diameter 80 mm 12.00 m¹ 386,300.00 4,635,600.00
Diameter 65 mm 12.00 m¹ 309,500.00 3,714,000.00
Diameter 50 mm 5.00 m¹ 197,300.00 986,500.00
Diameter 32 mm 150.00 m¹ 123,900.00 18,585,000.00
Diameter 25 mm 274.00 m¹ 92,500.00 25,345,000.00
Diameter 25 mm ( Flashing ) 12.00 m¹ 92,500.00 1,110,000.00
- Flashing valve diameter 25 mm 2.00 bh 302,100.00 604,200.00
- Head Sprinkler 100.00 bh 54,900.00 5,490,000.00
- Branch Control Valve ( BCV ) - -
- Indicating Valve diameter 100 mm 1.00 bh 2,246,800.00 2,246,800.00
- Test Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Drain Valve diameter 50 mm 1.00 bh 1,751,300.00 1,751,300.00
- Water Flow Switch 1.00 bh 4,086,300.00 4,086,300.00
- Plat Orifice diameter 100 mm 1.00 bh 258,500.00 258,500.00
- Sight glass 1.00 bh 1,751,300.00 1,751,300.00
- Pressure Indicator 1.00 bh 668,100.00 668,100.00
- -
6. LANTAI - R. MESIN - -
a. Instalasi Hydrant - -
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm 1.00 Set 5,295,300.00 5,295,300.00
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy 1.00 bh 1,678,200.00 1,678,200.00
- Control Valve dia 65 mm K.20 1.00 bh 7,660,700.00 7,660,700.00
- Pemipaan BSP Schedule 40 : - -
Diameter 65 mm 6.00 m¹ 309,500.00 1,857,000.00
- -
7. RISER - -
a. Pemipaan Hydrant, BSP Schedule 40 : - -
- Diameter 100 mm 40.00 m¹ 543,900.00 21,756,000.00
b. Pemipaan Sprinkler, BSP Schedule 40 : - -
- Diameter 100 mm 24.00 m¹ 543,900.00 13,053,600.00
c. Pemipaan Test, BSP Schedule 40 : - -
- Diameter 50 mm 24.00 m¹ 197,300.00 4,735,200.00
D. Pemipaan Flashing, BSP Schedule 40 : - -
- Diameter 50 mm 40.00 m¹ 197,300.00 7,892,000.00
E. Automatic Air valve ( AAV ) 2.00 bh 2,889,900.00 5,779,800.00
SUB TOTAL PEKERJAAN PEMADAMAN KEBAKARAN 778,533,100.00

IV. PEKERJAAN INSTALASI GAS MEDIS


1. LANTAI-2
a. OXIGEN ( O2 )
Instalasi Pemipaan tembaga standart ASTM B.88 Type L

Pek. Non Standart Gedung D - page 30 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- Diameter 25 mm 48.00 m 294,500.00 14,136,000.00


- Diameter 20 mm 32.00 m 158,600.00 5,075,200.00
- Diameter 15 mm 240.00 m 124,900.00 29,976,000.00
- Diameter 10 mm 367.00 m 55,100.00 20,221,700.00
Out Let Gas Oxygen (O2), 73.00 bh 1,497,200.00 109,295,600.00
b. VACUM ( V ) - -
Instalasi Pemipaan tembaga standart ASTM B.88 T - -
- Diameter 25 mm 48.00 m 294,500.00 14,136,000.00
- Diameter 20 mm 32.00 m 158,600.00 5,075,200.00
- Diameter 15 mm 240.00 m 124,900.00 29,976,000.00
- Diameter 10 mm 367.00 m 55,100.00 20,221,700.00
Out Let vacum,wall type 73.00 bh 1,497,200.00 109,295,600.00
c. Alarm Medis Gas 1.00 unit 14,940,200.00 14,940,200.00
d. Zone Valve with pressure gauge 1.00 unit 11,952,100.00 11,952,100.00
e. Head Bed Pabriaksi ukuran 1200 x 30 73.00 unit 1,791,900.00 130,808,700.00
0 -
2. LANTAI - 3 - -
a. OXIGEN ( O2 ) - -
Instalasi Pemipaan tembaga standart ASTM B.88 T - -
- Diameter 25 mm 48.00 m 294,500.00 14,136,000.00
- Diameter 20 mm 15.00 m 158,600.00 2,379,000.00
- Diameter 15 mm 306.00 m 124,900.00 38,219,400.00
- Diameter 10 mm 223.00 m 55,100.00 12,287,300.00
Out Let Gas Oxygen (O2), 73.00 bh 1,497,200.00 109,295,600.00
b. VACUM ( V ) - -
Instalasi Pemipaan tembaga standart ASTM B.88 T - -
- Diameter 25 mm 48.00 m 294,500.00 14,136,000.00
- Diameter 20 mm 15.00 m 158,600.00 2,379,000.00
- Diameter 15 mm 306.00 m 124,900.00 38,219,400.00
- Diameter 10 mm 369.00 m 55,100.00 20,331,900.00
Out Let vacum,wall type 73.00 bh 1,497,200.00 109,295,600.00
c. Alarm Medis Gas 1.00 unit 14,940,200.00 14,940,200.00
d. Zone Valve with pressure gauge 1.00 unit 11,952,100.00 11,952,100.00
e. Head Bed Pabriaksi ukuran 1200 x 30 73.00 unit 1,791,900.00 130,808,700.00
0 -
3. PIPA UTAMA DI SHAFT DAN PIPA KONEKSI DARI GEDU - -
a. Instalasi Pemipaan tembaga standart ASTM B.88 T - -
- Diameter 25 mm ( O2 ) 18.00 m 294,500.00 5,301,000.00
- Diameter 25 mm V ) 10.00 m 294,500.00 2,945,000.00
B. Instalasi Pemipaan tembaga standart ASTM B.88 T - -
- Diameter 25 mm ( O2 ) 30.00 m 294,500.00 8,835,000.00
- Diameter 25 mm V ) 30.00 m 294,500.00 8,835,000.00
SUB TOTAL PEKERJAAN INSTALASI GAS MEDIS 1,059,406,200.00

V. PEKERJAAN TATA UDARA DAN EXHAUST FAN


5.1 PEKERJAAN TATA UDARA ( VRV /VRF SYSTEM )
1. LOWER GROUND
a. Unit Air Conditioning VRV Sistem ( IU LG.1 s/d IU LG.4 )
- IU LG.1, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU LG.2, kapasitas : 18 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU LG.3, kapasitas : 18 000 btu/H - Cassete type 1.00 unit 10,794,600.00 10,794,600.00
- IU LG.4, kapasitas : 18 000 btu/H - Cassete type 1.00 unit 10,794,600.00 10,794,600.00
- OU LG, kapasitas : 86 000 btu/H 1.00 unit 45,711,000.00 45,711,000.00

Pek. Non Standart Gedung D - page 31 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- Cabang koneksi Indoor 3.00 bh 1,811,900.00 5,435,700.00


- Cabang koneksi Outdoor 1.00 bh 1,978,700.00 1,978,700.00
- Standart Wired 4.00 bh 1,031,000.00 4,124,000.00
- Pipa refrigerant 56.00 m' 201,700.00 11,295,200.00
- Pipa drain 24.00 m' 124,400.00 2,985,600.00
- Instalasi daya listrik Indoor uit 4.00 ttk 738,400.00 2,953,600.00
- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00
- Central Controller ACP 1.00 unit 25,845,000.00 25,845,000.00
Instalasi kabel kontrol AWG 120.00 30,000.00 3,600,000.00
2. GROUND FLOOR - -
a. Unit Air Conditioning VRV Sistem ( IU GF A.1 s/d IU GF A.1 - -
- IU GF.A1, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU GF.A2, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU GF.A3, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU GF.A4, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU GF.A5, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU GF.A6, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU GF.A7, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU GF.A8, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU GF.A9, kapasitas : 18 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.A9, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU GF.A10, kapasitas :18 000 btu/H - Cassete type - unit 10,794,600.00 -
IU GF.A10, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU GF.A11, kapasitas : 18 000 btu/H - Cassete type 1.00 unit 10,794,600.00 10,794,600.00
- IU GF.A12, kapasitas : 18 000 btu/H - Cassete type 1.00 unit 10,794,600.00 10,794,600.00
- IU GF.A13, kapasitas : 18 000 btu/H - Cassete type 1.00 unit 10,794,600.00 10,794,600.00
IU GF.A14, kapasitas : 18 000 btu/H - Cassete type 1.00 10,794,600.00 10,794,600.00
- OU GF.A, kapasitas : 226 000 btu/H - unit 117,601,700.00 -
OU GF.A, kapasitas : 250 000 btu/H 1.00 126,500,000.00 126,500,000.00
- Cabang koneksi Indoor 13.00 bh 1,811,900.00 23,554,700.00
- Cabang koneksi Outdoor 1.00 bh 1,978,700.00 1,978,700.00
- Standart Wired 14.00 bh 1,031,000.00 14,434,000.00
- Pipa refrigerant 172.00 m' 201,700.00 34,692,400.00
- Pipa drain 84.00 m' 124,400.00 10,449,600.00
- Instalasi daya listrik Indoor uit 14.00 ttk 738,400.00 10,337,600.00
- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00
Instalasi kabel kontrol AWG 193.00 30,000.00 5,790,000.00
- -
b. Unit Air Conditioning VRV Sistem ( IU GF B.1 s/d IU GF B.1 - -
- IU GF.B1, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU GF.B2, kapasitas : 18 000 btu/H - Cassete type - unit 10,794,600.00 -
IU GF.B2, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU GF.B3, kapasitas : 25 000 btu/H - Cassete type 1.00 unit 11,572,500.00 11,572,500.00
- IU GF.B4, kapasitas : 18 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.B4, kapasitas : 16 000 btu/H - Casette type 1.00 10,794,600.00 10,794,600.00
- IU GF.B5, kapasitas : 32 000 btu/H - Cassete type - unit 12,799,800.00 -
IU GF.B5, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU GF.B6, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.B6, kapasitas : 25 000 btu/H - Cassete type 1.00 11,572,500.00 11,572,500.00
- IU GF.B7, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.B7, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU GF.B8, kapasitas : 25 000 btu/H - Cassete type - unit 11,572,500.00 -
IU GF.B8, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00

Pek. Non Standart Gedung D - page 32 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- IU GF.B9, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -


IU GF.B9, kapasitas : 25 000 btu/H - Cassete type 1.00 11,572,500.00 11,572,500.00
- IU GF.B10, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.B10, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU GF.B11, kapasitas : 25 000 btu/H - Cassete type - unit 11,572,500.00 -
IU GF.B11, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU GF.B12, kapasitas : 6 000 btu/H - Wall type - unit 4,130,900.00 -
IU GF.B12, kapasitas : 25 000 btu/H - Cassete type 1.00 11,572,500.00 11,572,500.00
- IU GF.B13, kapasitas : 6 000 btu/H - Wall type - unit 4,130,900.00 -
IU GF.B13, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU GF.B14, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.B14, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU GF.B15, kapasitas : 12 000 btu/H - Wall type - unit 6,072,700.00 -
IU GF.B15, kapasitas : 16 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
IU GF.B16, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- OU GF.B, kapasitas : 272 000 btu/H - unit 141,549,700.00 -
OU GF.B, kapasitas : 307 000 btu/H 1.00 167,300,000.00 167,300,000.00
- Cabang koneksi Indoor 15.00 bh 1,811,900.00 27,178,500.00
- Cabang koneksi Outdoor 1.00 bh 1,978,700.00 1,978,700.00
- Standart Wired 16.00 bh 1,031,000.00 16,496,000.00
- Pipa refrigerant 225.00 m' 201,700.00 45,382,500.00
- Pipa drain 90.00 m' 124,400.00 11,196,000.00
- Instalasi daya listrik Indoor uit 16.00 ttk 738,400.00 11,814,400.00
- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00
Instalasi kabel kontrol AWG 257.00 30,000.00 7,710,000.00
- -
c. Unit Air Conditioning VRV Sistem ( IU GF C.1 s/d IU GF C.1 - -
- IU GF.C1, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU GF.C2, kapasitas : 12 000 btu/H - Wall type - unit 6,072,700.00 -
IU GF.C2, kapasitas : 6 000 btu/H - Wall type 1.00 4,130,900.00 4,130,900.00
- IU GF.C3, kapasitas : 12 000 btu/H - Wall type - unit 6,072,700.00 -
IU GF.C3, kapasitas : 16 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU GF.C4, kapasitas : 25 000 btu/H - Cassete type 1.00 unit 11,572,500.00 11,572,500.00
- IU GF.C5, kapasitas : 18 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.C5, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU GF.C6, kapasitas : 25 000 btu/H - Cassete type - unit 11,572,500.00 -
IU GF.C6, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU GF.C7, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.C7, kapasitas : 25 000 btu/H - Cassete type 1.00 11,572,500.00 11,572,500.00
- IU GF.C8, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.C8, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU GF.C9, kapasitas : 25 000 btu/H - Casste type - unit 11,572,500.00 -
IU GF.C9, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU GF.C10, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.C10, kapasitas : 25 000 btu/H - Cassete type 1.00 11,572,500.00 11,572,500.00
- IU GF.C11, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.C11, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU GF.C12, kapasitas : 25 000 btu/H - Cassete type - unit 11,572,500.00 -
IU GF.C12, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU GF.C13, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.C13, kapasitas : 25 000 btu/H - Cassete type 1.00 11,572,500.00 11,572,500.00
- IU GF.C14, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU GF.C14, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00

Pek. Non Standart Gedung D - page 33 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- IU GF.C15, kapasitas : 12 000 btu/H - Wall type - unit 6,072,700.00 -


IU GF.C15, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
IU GF.C16, kapasitas : 16 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- OU GF.C, kapasitas : 282 000 btu/H - unit 141,549,700.00 -
OU GF.C, kapasitas : 307 000 btu/H 1.00 167,300,000.00 167,300,000.00
- Cabang koneksi Indoor 15.00 bh 1,811,900.00 27,178,500.00
- Cabang koneksi Outdoor 1.00 bh 1,978,700.00 1,978,700.00
- Standart Wired 16.00 bh 1,031,000.00 16,496,000.00
- Pipa refrigerant 215.00 m' 201,700.00 43,365,500.00
- Pipa drain 90.00 m' 124,400.00 11,196,000.00
- Instalasi daya listrik Indoor uit 16.00 ttk 738,400.00 11,814,400.00
- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00
Instalasi kabel kontrol AWG 242.00 30,000.00 7,260,000.00
3. LANTAI 1 - -
a. Unit Air Conditioning VRV Sistem ( IU 1 A1 s/d IU 1 A14 ) - -
- IU 1.A1, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.A2, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.A3, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.A4, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.A5, kapasitas : 18 000 btu/H - Wall type - unit 7,363,300.00 -
IU 1.A5, kapasitas : 16 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU 1.A6, kapasitas : 18 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.A7, kapasitas : 25 000 btu/H - Cassete type 1.00 unit 11,572,500.00 11,572,500.00
- IU 1.A8, kapasitas : 25 000 btu/H - Cassete type 1.00 unit 11,572,500.00 11,572,500.00
- IU 1.A9, kapasitas : 18 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.A10, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.A11, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.A12, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.A13, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.A14, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- OU 1A, kapasitas : 326 000 btu/H 1.00 unit 159,108,200.00 159,108,200.00
- Cabang koneksi Indoor 13.00 bh 1,811,900.00 23,554,700.00
- Cabang koneksi Outdoor 1.00 bh 1,978,700.00 1,978,700.00
- Standart Wired 14.00 bh 1,031,000.00 14,434,000.00
- Pipa refrigerant 280.00 m' 201,700.00 56,476,000.00
- Pipa drain 84.00 m' 124,400.00 10,449,600.00
- Instalasi daya listrik Indoor uit 14.00 ttk 738,400.00 10,337,600.00
- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00
Instalasi kabel kontrol AWG 342.00 30,000.00 10,260,000.00
- -
b. Unit Air Conditioning VRV Sistem ( IU 1 B1 s/d IU 1 B20 ) - -
- IU 1.B1, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.B2, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.B3, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.B4, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.B5, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.B6, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.B7, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.B8, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.B9, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.B10, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.B11, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.B12, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00

Pek. Non Standart Gedung D - page 34 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- IU 1.B13, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.B14, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.B15, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 1.B16, kapasitas : 6 000 btu/H - Wall type 1.00 unit 4,130,900.00 4,130,900.00
- IU 1.B17, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.B18, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 1.B19, kapasitas : 32 000 btu/H - Cassete type - unit 12,799,800.00 -
IU 1.B19, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- IU 1.B20, kapasitas : 32 000 btu/H - Cassete type - unit 12,799,800.00 -
IU 1.B20, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
IU 1.B21, kapasitas : 16 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
IU 1.B22, kapasitas : 16 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
IU 1.B23, kapasitas : 18 000 btu/H - Wall type 1.00 7,363,300.00 7,363,300.00
- OU 1B, kapasitas : 356 000 btu/H - unit 197,847,300.00 -
OU 1B, kapasitas : 573 000 btu/H 1.00 303,500,000.00 303,500,000.00
- Cabang koneksi Indoor 22.00 bh 1,811,900.00 39,861,800.00
- Cabang koneksi Outdoor 2.00 bh 1,978,700.00 3,957,400.00
- Standart Wired 23.00 bh 1,031,000.00 23,713,000.00
- Pipa refrigerant 310.00 m' 201,700.00 62,527,000.00
- Pipa drain 120.00 m' 124,400.00 14,928,000.00
- Instalasi daya listrik Indoor uit 23.00 ttk 738,400.00 16,983,200.00
- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00
Instalasi kabel kontrol AWG 342.00 30,000.00 10,260,000.00
4. LANTAI. 2 - -
a. Unit Air Conditioning VRV Sistem ( IU 2 A1 s/d IU 2 A15 ) - -
- IU 2.A1, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 2.A2, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 2.A3, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 2.A4, kapasitas : 8 000 btu/H - Wall type - unit 6,072,700.00 -
IU 2.A4, kapasitas : 6 000 btu/H - Wall type 1.00 4,130,900.00 4,130,900.00
- IU 2.A5, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 2.A6, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 2.A7, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 2.A8, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 2.A9, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 2.A10, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 2.A11, kapasitas : 25 000 btu/H - Cassete type - unit 11,572,500.00 -
IU 2.A11, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU 2.A12, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU 2.A12, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU 2.A13, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 2.A14, kapasitas : 25 000 btu/H - Cassete type - unit 11,572,500.00 -
IU 2.A14, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- IU 2.A15, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU 2.A15, kapasitas : 16 000 btu/H - Casette type 1.00 10,794,600.00 10,794,600.00
IU 2.A16, kapasitas : 12 000 btu/H - Wall type 1.00 6,072,700.00 6,072,700.00
- OU 2A, kapasitas : 248 000 btu/H 1.00 unit 117,601,700.00 117,601,700.00
- Cabang koneksi Indoor 15.00 bh 1,811,900.00 27,178,500.00
- Cabang koneksi Outdoor 1.00 bh 1,978,700.00 1,978,700.00
- Standart Wired 16.00 bh 1,031,000.00 16,496,000.00
- Pipa refrigerant 215.00 m' 201,700.00 43,365,500.00
- Pipa drain 90.00 m' 124,400.00 11,196,000.00
- Instalasi daya listrik Indoor uit 16.00 ttk 738,400.00 11,814,400.00

Pek. Non Standart Gedung D - page 35 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00


Instalasi kabel kontrol AWG 252.00 30,000.00 7,560,000.00
- -
b. Unit Air Conditioning VRV Sistem ( IU 2 B1 s/d IU 2 B15 ) - -
- IU 2.B1, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 2.B2, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 2.B3, kapasitas : 6 000 btu/H - Wall type 1.00 unit 4,130,900.00 4,130,900.00
- IU 2.B4, kapasitas : 6 000 btu/H - Wall type 1.00 unit 4,130,900.00 4,130,900.00
- IU 2.B5, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 2.B6, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 2.B7, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 2.B8, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 2.B9, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 2.B10, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 2.B11, kapasitas : 16 000 btu/H - Wall type - unit 7,363,300.00 -
IU 2.B11, kapasitas : 16 000 btu/H - Casette type 1.00 10,794,600.00 10,794,600.00
- IU 2.B12, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 2.B13, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 2.B14, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 2.B15, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- OU 2B, kapasitas : 356 000 btu/H 1.00 unit 197,847,300.00 197,847,300.00
- Cabang koneksi Indoor 14.00 bh 1,811,900.00 25,366,600.00
- Cabang koneksi Outdoor 1.00 bh 1,978,700.00 1,978,700.00
- Standart Wired 15.00 bh 1,031,000.00 15,465,000.00
- Pipa refrigerant 210.00 m' 201,700.00 42,357,000.00
- Pipa drain 90.00 m' 124,400.00 11,196,000.00
- Instalasi daya listrik Indoor uit 15.00 ttk 738,400.00 11,076,000.00
- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00
Instalasi kabel kontrol AWG 252.00 30,000.00 7,560,000.00
5. LANTAI. 3 - -
a. Unit Air Conditioning VRV Sistem ( IU 3.A1 s/d IU 3.A14 ) - -
- IU 3.A1, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 3.A2, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 3.A3, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 3.A4, kapasitas : 6 000 btu/H - Wall type 1.00 unit 4,130,900.00 4,130,900.00
- IU 3.A5, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 3.A6, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 3.A7, kapasitas : 6 000 btu/H - Wall type 1.00 unit 4,130,900.00 4,130,900.00
- IU 3.A8, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 3.A9, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 3.A10, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.A11, kapasitas : 25 000 btu/H - Cassete type 1.00 unit 11,572,500.00 11,572,500.00
- IU 3.A12, kapasitas : 16 000 btu/H - Wall type 1.00 unit 7,363,300.00 7,363,300.00
- IU 3.A13, kapasitas : 25 000 btu/H - Cassete type 1.00 unit 11,572,500.00 11,572,500.00
- IU 3.A14, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- OU 3A kapasitas : 242 000 btu/H 1.00 unit 117,601,700.00 117,601,700.00
- Cabang koneksi Indoor 13.00 bh 1,811,900.00 23,554,700.00
- Cabang koneksi Outdoor 1.00 bh 1,978,700.00 1,978,700.00
- Standart Wired 14.00 bh 1,031,000.00 14,434,000.00
- Pipa refrigerant 196.00 m' 201,700.00 39,533,200.00
- Pipa drain 8.00 m' 124,400.00 995,200.00
- Instalasi daya listrik Indoor uit 14.00 ttk 738,400.00 10,337,600.00
- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00

Pek. Non Standart Gedung D - page 36 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

Instalasi kabel kontrol AWG 252.00 30,000.00 7,560,000.00


- -
b. Unit Air Conditioning VRV Sistem ( IU 3.B1 s/d IU 3.B14 ) - -
- IU 3.B1, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.B2, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 3.B3, kapasitas : 6 000 btu/H - Wall type 1.00 unit 4,130,900.00 4,130,900.00
- IU 3.B4, kapasitas : 6 000 btu/H - Wall type 1.00 unit 4,130,900.00 4,130,900.00
- IU 3.B5, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.B6, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.B7, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.B8, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.B9, kapasitas : 12 000 btu/H - Wall type 1.00 unit 6,072,700.00 6,072,700.00
- IU 3.B10, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.B11, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.B12, kapasitas : 32 000 btu/H - Casete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.B13, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- IU 3.B14, kapasitas : 32 000 btu/H - Cassete type 1.00 unit 12,799,800.00 12,799,800.00
- OU 3A kapasitas : 356 000 btu/H 1.00 unit 197,847,300.00 197,847,300.00
- Cabang koneksi Indoor 13.00 bh 1,811,900.00 23,554,700.00
- Cabang koneksi Outdoor 1.00 bh 1,978,700.00 1,978,700.00
- Standart Wired 14.00 bh 1,031,000.00 14,434,000.00
- Pipa refrigerant 196.00 m' 201,700.00 39,533,200.00
- Pipa drain 8.00 m' 124,400.00 995,200.00
- Instalasi daya listrik Indoor uit 14.00 ttk 738,400.00 10,337,600.00
- Instalasi Outdoor Unit 1.00 ttk 7,743,600.00 7,743,600.00
Instalasi kabel kontrol AWG 252.00 30,000.00 7,560,000.00

SUB TOTAL PEKERJAAN TATA UDARA DAN EXHAUST FAN 4,126,306,700.00

5.2. PEKERJAAN EXHAUST FAN


1. LOWER GROUND
a. Unit Fan
- Exhaust Fan / Inline Fan (EF.LG.1) , Kapasitas 1.00 unit 21,730,100.00 21,730,100.00
- Exhaust Fan / Inline Fan (EF.LG.2) , Kapasitas 1.00 unit 21,730,100.00 21,730,100.00
- Exhaust Fan / Inline Fan (EF.LG.3) , Kapasitas 1.00 unit 2,499,300.00 2,499,300.00
- Exhaust Fan / Inline Fan (EF LG.4) , Kapasitas 1.00 unit 11,471,800.00 11,471,800.00
- Intake Fan / Inline Fan (IF.LG.1 ) , Kapasitas 1.00 unit 47,525,200.00 47,525,200.00
- Ceiling Fan Gantung 500 Cfm 1.00 unit 935,500.00 935,500.00
- Titik Instalasi daya FAN 6.00 ttk 332,100.00 1,992,600.00
b. Ducting Exhaust tanpa isolasi : - -
- Ducting Exhaust - -
6"x 6" 16.00 m' 130,300.00 2,084,800.00
8"x 6" 1.00 m' 152,000.00 152,000.00
8"x 8" 3.00 m' 173,700.00 521,100.00
10 " x 8 " 5.00 m' 195,400.00 977,000.00
12 " x 8" 3.00 m' 217,100.00 651,300.00
16 " x 12 " 14.00 m' 386,000.00 5,404,000.00
20 " x 16 " 8.00 m' 496,200.00 3,969,600.00
24 " x 16 " 10.00 m' 551,400.00 5,514,000.00
28 " x 18 " 7.00 m' 634,100.00 4,438,700.00
32 " x 18 " 13.00 m' 850,000.00 11,050,000.00
PVC dia. 250 mm 23.00 m' 771,500.00 17,744,500.00
PVC dia. 200 mm 11.00 m' 520,900.00 5,729,900.00

Pek. Non Standart Gedung D - page 37 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

Exhaust Air Grille ( EAG 6 " x 6" ) 3.00 bh 140,900.00 422,700.00


Intake Air Grille ( IAG 28 " x 12" ) 11.00 bh 362,500.00 3,987,500.00
- Ducting Intake Fan - -
32 " x 24 " 13.00 m' 952,000.00 12,376,000.00
30 " x 24 " 3.00 m' 744,300.00 2,232,900.00
28 " x 20 " 3.00 m' 661,600.00 1,984,800.00
26 " x 20 " 3.00 m' 634,100.00 1,902,300.00
24 " x 20 " 3.00 m' 606,500.00 1,819,500.00
24 " x 18 " 3.00 m' 578,900.00 1,736,700.00
20 " x 16 " 3.00 m' 496,200.00 1,488,600.00
Intake Air Grille ( IAG 32 " x 12" ) 8.00 bh 482,900.00 3,863,200.00
- -
2. GROUND FLOOR - -
a. Unit Fan - -
- Ceiling Fan / Extract Fan (CF.GF.1) , Kapasitas 1.00 unit 521,700.00 521,700.00
- Ceiling Fan / Extract Fan (CF.GF.2) , Kapasitas 1.00 unit 521,700.00 521,700.00
- Ceiling Fan / Extract Fan (CF.GF.3) , Kapasitas 1.00 unit 521,700.00 521,700.00
- Exhaust Fan / Inline Fan (EF.GF.1) , Kapasitas 1.00 unit 981,500.00 981,500.00
- Exhaust Fan / Inline Fan (EF.GF.2) , Kapasitas 1.00 unit 1,317,900.00 1,317,900.00
- Titik Instalasi daya FAN 5.00 ttk 332,100.00 1,660,500.00
b. Ducting Exhaust tanpa isolasi : - -
- Ducting Exhaust - -
6"x 6" 17.00 m' 130,300.00 2,215,100.00
6"x 8" 3.00 m' 152,000.00 456,000.00
8"x 8" 8.00 m' 173,700.00 1,389,600.00
10 " x 8 " 3.00 m' 195,400.00 586,200.00
PVC dia. 100 mm 12.00 m' 166,300.00 1,995,600.00
Exhaust Air Grille ( EAG 6 " x 6 " ) 3.00 bh 140,900.00 422,700.00
Exhaust Air Grille ( EAG 14 " x 10 " ) 1.00 bh 235,900.00 235,900.00
Grille Hood ( 16 ' x 10 " ) 1.00 bh 251,700.00 251,700.00
- -
3. LANTAI - 1 - -
a. Unit Fan - -
- Exhaust Fan / Inline Fan (EF.1.2) , Kapasitas : 1.00 unit 981,500.00 981,500.00
- Exhaust Fan / Inline Fan (EF.1.3) , Kapasitas : 1.00 unit 1,317,900.00 1,317,900.00
- Titik Instalasi daya FAN 2.00 ttk 332,100.00 664,200.00
b. Ducting Exhaust tanpa isolasi : - -
Ducting Exhaust - -
6"x 6" 6.00 m' 130,300.00 781,800.00
6"x 8" 4.00 m' 152,000.00 608,000.00
8"x 8" 7.00 m' 173,700.00 1,215,900.00
10 " x 8 " 4.00 m' 195,400.00 781,600.00
Exhaust Air Grille ( EAG 6 " x 6 " ) 3.00 bh 140,900.00 422,700.00
Exhaust Air Grille ( EAG 14 " x 10 " ) 1.00 bh 235,900.00 235,900.00
Grille Hood ( 16 ' x 10 " ) 1.00 bh 251,700.00 251,700.00
- -
4. LANTAI .2 - -
a. Unit Fan - -
- Ceiling Fan / Extract Fan (CF.2.1 s/d CF 2.20 ) 20.00 unit 521,700.00 10,434,000.00
- Exhaust Fan / Inline Fan (EF.2.1) , Kapasitas : 1.00 unit 2,499,300.00 2,499,300.00
- Exhaust Fan / Inline Fan (EF.2.2) , Kapasitas : 1.00 unit 981,500.00 981,500.00
- Exhaust Fan / Inline Fan (EF.2.3) , Kapasitas : 1.00 unit 1,317,900.00 1,317,900.00
- Titik Instalasi daya FAN 23.00 ttk 332,100.00 7,638,300.00

Pek. Non Standart Gedung D - page 38 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

b. Ducting Exhaust tanpa isolasi : - -


Ducting Exhaust - -
6"x 6" 44.00 m' 130,300.00 5,733,200.00
6"x 8" 31.00 m' 152,000.00 4,712,000.00
8"x 8" 15.00 m' 173,700.00 2,605,500.00
10 " x 8 " 18.00 m' 195,400.00 3,517,200.00
12 " x 8 " 7.00 m' 217,100.00 1,519,700.00
12 " x 10 " 1.00 m' 238,800.00 238,800.00
Grille Hood ( 16 ' x 10 " ) 1.00 bh 251,700.00 251,700.00
Exhaust Air Grille ( EAG 14 " x 10 " ) 1.00 bh 235,900.00 235,900.00
Exhaust Air Grille ( EAG 6 " x 6 " ) 19.00 bh 140,900.00 2,677,100.00
- -
5. LANTAI - 3 - -
a. Unit Fan - -
- Ceiling Fan / Extract Fan (CF.3.1 s/d CF 3.20 ) 20.00 unit 521,700.00 10,434,000.00
- Exhaust Fan / Inline Fan (EF.3.1) , Kapasitas : 1.00 unit 2,499,300.00 2,499,300.00
- Exhaust Fan / Inline Fan (EF.3.2) , Kapasitas : 1.00 unit 981,500.00 981,500.00
- Exhaust Fan / Inline Fan (EF.3.3) , Kapasitas : 1.00 unit 1,317,900.00 1,317,900.00
- Titik Instalasi daya FAN 23.00 ttk 332,100.00 7,638,300.00
b. Ducting Exhaust tanpa isolasi : - -
Ducting Exhaust - -
6"x 6" 44.00 m' 130,300.00 5,733,200.00
6"x 8" 31.00 m' 152,000.00 4,712,000.00
8"x 8" 15.00 m' 173,700.00 2,605,500.00
10 " x 8 " 18.00 m' 195,400.00 3,517,200.00
12 " x 8 " 7.00 m' 217,100.00 1,519,700.00
12 " x 10 " 1.00 m' 238,800.00 238,800.00
Grille Hood ( 16 ' x 10 " ) 1.00 bh 251,700.00 251,700.00
Exhaust Air Grille ( EAG 14 " x 10 " ) 1.00 bh 235,900.00 235,900.00
Exhaust Air Grille ( EAG 6 " x 6 " ) 19.00 bh 140,900.00 2,677,100.00
- -
6. LANTAI - R. Mesin & Riser di Shaft - -
a. Ducting Exhaust tanpa isolasi : - -
- Ducting Exhaust di lantai R.Mesin - -
12 " x 10 " 2.00 m' 238,800.00 477,600.00
10 " x 8 " 2.00 m' 195,400.00 390,800.00
8"x 8" 5.00 m' 173,700.00 868,500.00
6"x 8" 5.00 m' 152,000.00 760,000.00
6"x 6" 2.00 m' 130,300.00 260,600.00
- Ducting Exhaust Riser di Shaft - -
32 " x 20 " 24.00 m' 884,000.00 21,216,000.00
12 " x 10 " 4.00 m' 238,800.00 955,200.00
10 " x 8 " 26.00 m' 195,400.00 5,080,400.00
8"x 8" 8.00 m' 173,700.00 1,389,600.00
6"x 8" 32.00 m' 152,000.00 4,864,000.00
6"x 6" 4.00 m' 130,300.00 521,200.00
- -
b. Smoke Presurized Fan - -
- Smoke Presurized Fan + Box Peredam (SPF.1) , 1.00 unit 24,622,000.00 24,622,000.00
- Smoke Presurized Fan + Box Peredam (SPF.2) , 1.00 unit 24,622,000.00 24,622,000.00
- Titik Instalasi daya FAN 2.00 ttk 332,100.00 664,200.00
- Ducting Smoke Pressurized Fan tanpa isolasi : - -
- 28 " x 14 " di atap 4.00 m' 578,900.00 2,315,600.00

Pek. Non Standart Gedung D - page 39 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- 26 " x 12 " di shaft 16.00 m' 523,800.00 8,380,800.00


- 24 " x 12 " di shaft 16.00 m' 496,200.00 7,939,200.00
- Intake Air Grille ( IAG 28 " x 14 " ) 4.00 bh 463,000.00 1,852,000.00
- Intake Air Grille ( IAG 26 " x 12 " ) 4.00 bh 346,700.00 1,386,800.00
- Intake Air Grille ( IAG 24 " x 12 " ) 4.00 bh 330,900.00 1,323,600.00
SUB TOTAL PEKERJAAN EXHAUST FAN 416,889,000.00

VI. PEKERJAAN TRANSPORTASI TABUNG PNEMATIK


(PNEUMATIC TUBE SYSTEM )
A. STATIONS & DIVERTERS AND ACCESSORIES
1. Top Loading Station
All Stations incl. Basket, Cushion and Carrier Rack 4.00 Unit 39,485,200.00 157,940,800.00
- -
B. TUBE AND LINE SYSTEM - -
1. Tubes PVC - Diam. 110 MM RAL 7000 79.00 m 147,800.00 11,676,200.00
2. Tubes PVC - Diam. 110 MM Transparent 12.00 m 936,300.00 11,235,600.00
3. Bend R=800, RAL 7001, Grey 15.00 Buah 1,020,400.00 15,306,000.00
4. Bend R=800, RAL 7001, Transparent 12.00 Buah 3,196,300.00 38,355,600.00
5. Sleeve 95.00 Buah 54,400.00 5,168,000.00
6. Cable 2x2x0.23 + 3x2.5F 150.00 m 113,300.00 16,995,000.00
- -
C. CARRIERS AND ACCESSORIES - -
1. Long Carrier With Swivel Red Lid 330x72 MM With Chip 4.00 Buah 2,512,600.00 10,050,400.00
2. Short Carrier With Swivel Yellow Lid 230x80 MM With Chip 16.00 Buah 1,970,900.00 31,534,400.00
- -
D. VARIOUS INSTALLATION MATERIAL - -
1. Supporting Mateial terdiri dari 1.00 Ls 22,399,000.00 22,399,000.00
a. Clutch Clamp Stainless Steel - -
b. Endpiece Above / Below - -
c. PVC Conduit 20 MM - -
d. Sikla Base Plate - -
e. Pipeclamp - -
f. Sikla Screw Bolt - -
g. Screw Bolt - -
h. Cable Clip - -
i. Hose Clamp 100-120 - -
j. Air Lid (Silicon Flap) - -
k. Adhesive Glue - -
l. Cleaner For PVC-Tube - -
m. Dowel M10 - -
- -
E. INSTALATION, TEST AND COMMISIONING - -
1. Biaya Instalasi 1.00 Ls 18,665,900.00 18,665,900.00
2. Biaya Test dan Komisioning 1.00 Ls 7,466,300.00 7,466,300.00
SUB TOTAL PEKERJAAN TRANSPORTASI TABUNG PNEMATIK 346,793,200.00

VII. PEKERJAAN LIFT


1. Pekerjaan Lift ( No.1 ) ROOMLESS
- Jenis : Hospital Bed Lift 1.00 unit 677,017,000.00 677,017,000.00
- Kapasitas : 1600 Kg -
- Kecepatan : 60 Mpm -
- Lintasan : 5 Lantai -
-

Pek. Non Standart Gedung D - page 40 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

2. Pekerjaan Lift ( No.2 ) ROOMLESS -


- Jenis : Service / Firemans 1.00 unit 729,404,400.00 729,404,400.00
- Kapasitas : 1250 Kg -
- Kecepatan : 60 Mpm -
- Lintasan : 5 Lantai -
-
3. Pemasangan 2.00 unit 34,460,000.00 68,920,000.00
- Automatic rescue Device (ARD)
- Sparator Beam
. Sparator beam WF. 200.100.5,5.8
. Beam melintang WF. 200.100.5,5.8
. Base plat tebal 10 cm
. Zincromate
. Dynabolt dia. 12 mm, Heavy duty
. Hode dia. 22 mm
- Jasa pemasangan & test comm
- Biaya izin Kemnaker
- Demobilisasi dan Mobilisasi
SUB TOTAL PEKERJAAN LIFT 1,475,341,400.00

V. PEKERJAAN ELEKTRIKAL ARUS KUAT


5.1. PEKERJAAN RAK KABEL
1 LANTAI SATU
a. Rak Kabel
- Ukuran 40 cm, termasuk sambungan & penun 123.00 m¹ 375,200.00 46,149,600.00
- Ukuran 20 cm, termasuk sambungan & penun 166.00 m¹ 280,800.00 46,612,800.00
- -
2 LANTAI DUA - -
a. Rak Kabel - -
- Ukuran 40 cm, termasuk sambungan & penun 123.00 m¹ 375,200.00 46,149,600.00
- Ukuran 20 cm, termasuk sambungan & penun 166.00 m¹ 280,800.00 46,612,800.00
- -
3 LANTAI TIGA - -
a. Rak Kabel - -
- Ukuran 40 cm, termasuk sambungan & penun 123.00 m¹ 375,200.00 46,149,600.00
- Ukuran 20 cm, termasuk sambungan & penun 166.00 m¹ 280,800.00 46,612,800.00
- -
4 LANTAI EMPAT - -
a. Rak Kabel - -
- Ukuran 40 cm, termasuk sambungan & penun 123.00 m¹ 375,200.00 46,149,600.00
- Ukuran 20 cm, termasuk sambungan & penun 166.00 m¹ 280,800.00 46,612,800.00
- -
7 SHAFT - -
1 Kabel Leader - -
- Ukuran 80 cm, termasuk sambungan & penun 123.00 m¹ 370,100.00 45,522,300.00
- Ukuran 40 cm, termasuk sambungan & penun 166.00 m¹ 281,000.00 46,646,000.00
SUB TOTAL PEKERJAAN RAK KABEL 463,217,900.00

5.2. PEKERJAAN PENANGKAL PETIR & GROUNDING SISTEM


1 Air Terminal Splitzent ( R = 90 M ) 1.00 unit 40,203,400.00 40,203,400.00
2 Coaxial Cable 2 x 35 mm2 35.00 m¹ 574,300.00 20,100,500.00
3 Grounding sistem 1.00 ttk 17,230,000.00 17,230,000.00
- Copper road - -

Pek. Non Standart Gedung D - page 41 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- Pentanahan max.2 Ohm bahan GSP dia.50mm² + - -


- Bak kontrol ( 40x40) cm lengkap tutup - -
- Testing/pengukuran pentanahan - -
- Material bantu dan accessories - -
- Proses pengesahan gambar ke DepNaker RI - -
4 Grounding sitem untuk Panel & peralatan 1.00 lot 17,230,000.00 17,230,000.00
5 Alat bantu & Testing Commisioning 1.00 lot 11,486,700.00 11,486,700.00
SUB TOTAL PEKERJAAN PENANGKAL PETIR & GROUNDING SISTEM 106,250,600.00

Pek. Non Standart Gedung D - page 42 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

VI. PEKERJAAN ELEKTRIKAL ARUS LEMAH


6.1. PEKERJAAN TELEPHONE
1 LOWER GROUND
- Kabel Feeder, dari TB-T.GF, ITC Cable 4x 0,6 mm2 20.00 m' 54,800.00 1,096,000.00
- Outlet Telephone ( RJ ) 2.00 bh 51,300.00 102,600.00
- Pesawat Telephone 2.00 bh 159,200.00 318,400.00
- Titik instalasi Outlet Telephone, ITC 4 x 0,6 mm2, 2.00 ttk 353,800.00 707,600.00
- -
2 GROUND FLOOR - -
- CTBT-D (100 pairs) 1.00 bh 1,326,700.00 1,326,700.00
- Terminal Box TBT-GF (30 Pairs) 1.00 unit 796,000.00 796,000.00
- Setting & Testing Commisioning 1.00 ls 13,267,100.00 13,267,100.00
- IP PBX 20/200 1.00 unit 160,974,400.00 160,974,400.00
- Kabel Feeder, dari CTBT-D ke TB-T.GF, ITC Cable 30 6.00 m' 54,800.00 328,800.00
- Kabel Feeder, dari MDF-Telp ke CTBT-D, ITC Cable 50.00 m' 54,800.00 2,740,000.00
- Outlet Telephone ( RJ ) 27.00 bh 51,300.00 1,385,100.00
- Pesawat Telephone 27.00 bh 159,200.00 4,298,400.00
- Titik instalasi Outlet Telephone, ITC 4 x 0,6 mm2, 27.00 ttk 353,800.00 9,552,600.00
- -
3 LANTAI SATU - -
- Terminal Box TBT-1 (20 Pairs) 1.00 unit 751,800.00 751,800.00
- Kabel Feeder, dari CTBT-D ke TB-T.1, ITC Cable 30 10.00 m' 54,800.00 548,000.00
- Outlet Telephone ( RJ ) 21.00 bh 51,300.00 1,077,300.00
- Pesawat Telephone 21.00 bh 159,200.00 3,343,200.00
- Titik instalasi Outlet Telephone, ITC 4 x 0,6 mm2, 21.00 ttk 353,800.00 7,429,800.00
- -
4 LANTAI DUA - -
- Terminal Box TBT-2 (20 Pairs) 1.00 unit 751,800.00 751,800.00
- Kabel Feeder, dari CTBT-D ke TB-T.2, ITC Cable 30 10.00 m' 54,800.00 548,000.00
- Outlet Telephone ( RJ ) 11.00 bh 51,300.00 564,300.00
- Pesawat Telephone 11.00 bh 159,200.00 1,751,200.00
- Titik instalasi Outlet Telephone, ITC 4 x 0,6 mm2, 11.00 ttk 353,800.00 3,891,800.00
- -
5 LANTAI TIGA - -
- Terminal Box TBT-3 (20 Pairs) 1.00 unit 751,800.00 751,800.00
- Kabel Feeder, dari CTBT-D ke TB-T.3, ITC Cable 20 20.00 m' 54,800.00 1,096,000.00
- Outlet Telephone ( RJ ) 13.00 bh 51,300.00 666,900.00
- Pesawat Telephone 13.00 bh 159,200.00 2,069,600.00
- Titik instalasi Outlet Telephone, ITC 4 x 0,6 mm2, 13.00 ttk 353,800.00 4,599,400.00
SUB TOTAL PEKERJAAN ELEKTRIKAL ARUS LEMAH 226,734,600.00

6.2. PEKERJAAN DATA DAN ACCEES POINT


1. LOWER GROUND
- Wall Mount Rack 19" 12U 1.00 unit 23,880,800.00 23,880,800.00
Rackmount ODF 12 core 1.00 14,168,000.00 14,168,000.00
Distribution Switch 1.00 40,710,000.00 40,710,000.00
Patch Panel 1.00 16,560,000.00 16,560,000.00
Access Switch Poe 1.00 70,800,000.00 70,800,000.00
Access Switch 1.00 35,190,000.00 35,190,000.00
PDU Ports 1.00 6,040,000.00 6,040,000.00
- FO Cable SM 6 Core dari Wallmount Rack LG 10.00 m' 66,300.00 663,000.00
- Outlet Data ( RJ 45 ) 7.00 bh 221,100.00 1,547,700.00

Pek. Non Standart Gedung D - page 43 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- Wi - Fi 1.00 bh 3,980,100.00 3,980,100.00


- Titik Instalasi Data & Wi - Fi, Coaxial Cable Cat - 6 8.00 ttk 1,592,100.00 12,736,800.00
- -
2. GROUND FLOOR - -
- Wall Mount Rack 19" 12U 1.00 unit 23,880,800.00 23,880,800.00
Rackmount ODF 12 core 1.00 14,168,000.00 14,168,000.00
Distribution Switch 1.00 40,710,000.00 40,710,000.00
Patch Panel 1.00 16,560,000.00 16,560,000.00
Access Switch Poe 1.00 70,800,000.00 70,800,000.00
Access Switch 1.00 35,190,000.00 35,190,000.00
PDU Ports 1.00 6,040,000.00 6,040,000.00
- UTP Cable Cat-6 10.00 m' 22,100.00 221,000.00
Rackmount ODF 12 core 1.00 14,168,000.00 14,168,000.00
Distribution Switch 1.00 40,710,000.00 40,710,000.00
Patch Panel 1.00 16,560,000.00 16,560,000.00
Access Switch Poe 1.00 70,800,000.00 70,800,000.00
Access Switch 1.00 35,190,000.00 35,190,000.00
PDU Ports 1.00 6,040,000.00 6,040,000.00
- FO Cable SM 6 Core dari Wallmount Rack LG 20.00 m' 66,300.00 1,326,000.00
- Outlet Data ( RJ 45 ) 23.00 bh 221,100.00 5,085,300.00
- Wi - Fi 4.00 bh 3,980,100.00 15,920,400.00
- Titik Instalasi Data & Wi - Fi, Coaxial Cable Cat - 6 27.00 ttk 1,592,100.00 42,986,700.00
FO Cable SM 4 Core dari ODF.B1 100.00 250,000.00 25,000,000.00
- -
3 LANTAI SATU - -
- Wall Mount Rack 19" 12U 1.00 unit 23,880,800.00 23,880,800.00
Rackmount ODF 12 core 1.00 14,168,000.00 14,168,000.00
Distribution Switch 1.00 40,710,000.00 40,710,000.00
Patch Panel 1.00 16,560,000.00 16,560,000.00
Access Switch Poe 1.00 70,800,000.00 70,800,000.00
Access Switch 1.00 35,190,000.00 35,190,000.00
PDU Ports 1.00 6,040,000.00 6,040,000.00
- UTP Cable Cat-6 10.00 m' 22,100.00 221,000.00
- PC + LED TV Monitor 32 inch ---- for monitoring 2.00 bh 6,633,600.00 13,267,200.00
- FO Cable SM 6 Core dari Wallmount Rack LG 25.00 m' 66,300.00 1,657,500.00
- Outlet Data ( RJ 45 ) 18.00 bh 221,100.00 3,979,800.00
- Wi - Fi 4.00 bh 3,980,100.00 15,920,400.00
- Titik Instalasi Data & Wi - Fi, Coaxial Cable Cat - 6 22.00 ttk 1,592,100.00 35,026,200.00
- -
4 LANTAI DUA - -
- Wall Mount Rack 19" 12U 1.00 unit 23,880,800.00 23,880,800.00
Rackmount ODF 12 core 1.00 14,168,000.00 14,168,000.00
Distribution Switch 1.00 40,710,000.00 40,710,000.00
Patch Panel 1.00 16,560,000.00 16,560,000.00
Access Switch Poe 1.00 70,800,000.00 70,800,000.00
Access Switch 1.00 35,190,000.00 35,190,000.00
PDU Ports 1.00 6,040,000.00 6,040,000.00
- UTP Cable Cat-6 10.00 m' 22,100.00 221,000.00
- FO Cable SM 6 Core dari Wallmount Rack LG 30.00 m' 66,300.00 1,989,000.00
- Outlet Data ( RJ 45 ) 12.00 bh 221,100.00 2,653,200.00
- Wi - Fi 8.00 bh 3,980,100.00 31,840,800.00
- Titik Instalasi Data & Wi - Fi, Coaxial Cable Cat - 6 20.00 ttk 1,592,100.00 31,842,000.00
- -

Pek. Non Standart Gedung D - page 44 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

5 LANTAI TIGA - -
- Wall Mount Rack 19" 12U 1.00 unit 23,880,800.00 23,880,800.00
Rackmount ODF 12 core 1.00 14,168,000.00 14,168,000.00
Distribution Switch 1.00 40,710,000.00 40,710,000.00
Patch Panel 1.00 16,560,000.00 16,560,000.00
Access Switch Poe 1.00 70,800,000.00 70,800,000.00
Access Switch 1.00 35,190,000.00 35,190,000.00
PDU Ports 1.00 6,040,000.00 6,040,000.00
- UTP Cable Cat-6 10.00 m' 22,100.00 221,000.00
- FO Cable SM 6 Core dari Wallmount Rack LG 35.00 m' 66,300.00 2,320,500.00
- Outlet Data ( RJ 45 ) 14.00 bh 221,100.00 3,095,400.00
- Wi - Fi 8.00 bh 3,980,100.00 31,840,800.00
- Titik Instalasi Data & Wi - Fi, Coaxial Cable Cat - 6 22.00 ttk 1,592,100.00 35,026,200.00
SUB TOTAL PEKERJAAN DATA DAN ACCEES POINT - 1,540,801,000.00

6.3. PEKERJAAN CCTV


1 PERALATAN UTAMA
- Network Video Recorder ( NVR ) 32 Chanel 2.00 unit 21,227,400.00 42,454,800.00
- PC + LED TV Monitor 32 inch ---- for monitoring c 2.00 bh 6,633,600.00 13,267,200.00
- UTP Cable Cat - 6e 50.00 m 22,100.00 1,105,000.00
- UPS 1.00 unit 60,144,300.00 60,144,300.00
- -
2 LOWER GROUND - -
- Dome Camera 2.00 bh 5,483,700.00 10,967,400.00
- Bullet Camera 2.00 bh 6,633,600.00 13,267,200.00
- Titik Instalasi Camera, Coaxial Twisted Cable dala 2.00 ttk 2,211,200.00 4,422,400.00
- Titik Instalasi Daya Camera, NYM 3 x 2, 5 mm2, da 2.00 ttk 722,900.00 1,445,800.00
- -
- -
3 GROUND FLOOR - -
- Dome Camera 6.00 bh 5,483,700.00 32,902,200.00
- Titik Instalasi Camera, Coaxial Twisted Cable dala 6.00 ttk 2,211,200.00 13,267,200.00
- Titik Instalasi Daya Camera, NYM 3 x 2, 5 mm2, da 6.00 ttk 722,900.00 4,337,400.00
- -
- -
4 LANTAI SATU - -
- Dome Camera 6.00 bh 5,483,700.00 32,902,200.00
- Titik Instalasi Camera, Coaxial Twisted Cable dala 6.00 ttk 2,211,200.00 13,267,200.00
- Titik Instalasi Daya Camera, NYM 3 x 2, 5 mm2, da 6.00 ttk 722,900.00 4,337,400.00
- -
- -
5 LANTAI DUA - -
- Dome Camera 7.00 bh 5,483,700.00 38,385,900.00
- Titik Instalasi Camera, Coaxial Twisted Cable dala 7.00 ttk 2,211,200.00 15,478,400.00
- Titik Instalasi Daya Camera, NYM 3 x 2, 5 mm2, da 7.00 ttk 722,900.00 5,060,300.00
- -
- -
6 LANTAI TIGA - -
- Dome Camera 7.00 bh 5,483,700.00 38,385,900.00
- Titik Instalasi Camera, Coaxial Twisted Cable dala 7.00 ttk 2,211,200.00 15,478,400.00
- Titik Instalasi Daya Camera, NYM 3 x 2, 5 mm2, da 7.00 ttk 722,900.00 5,060,300.00

SUB TOTAL PEKERJAAN CCTV 365,936,900.00

Pek. Non Standart Gedung D - page 45 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

6.4. PEKERJAAN TATA SUARA


1 SENTRAL TATA SUARA PUBLIC ADRESS
a. IP Power Amplifier 240 Watt 3.00 unit 33,610,000.00 100,830,000.00
b. IP Power Amplifier 480 Watt 1.00 unit 33,610,000.00 33,610,000.00
c. Digital Mixer Pree Amp 1.00 unit 45,992,700.00 45,992,700.00
d. CD/MP3 1.00 set 7,518,000.00 7,518,000.00
e. Radio Tunner 1.00 unit 4,422,400.00 4,422,400.00
f. Audio Streamer 1.00 unit 4,422,400.00 4,422,400.00
g. Emergency Microphone 1.00 unit 16,451,200.00 16,451,200.00
h. Pagging Microphone 1.00 unit 12,382,600.00 12,382,600.00
i. UPS + Battere Charger 1.00 unit 42,454,800.00 42,454,800.00
j. CTBS-D 1.00 unit 1,326,700.00 1,326,700.00
k. Cabinet Rack & aacesories 1.00 set 14,151,600.00 14,151,600.00
l. kabel UTP CAT-6 Ke Switch Manageable 75.00 m¹ 19,500.00 1,462,500.00
m. Radio Tunner 1.00 unit 4,422,400.00 4,422,400.00
n. Kabel ke MDF-S di Gedung BTC 80.00 m¹ 66,300.00 5,304,000.00
- -
2 LOWER GROUND - -
a. TBS- LG 1.00 bh 663,400.00 663,400.00
b. Kabel dari CTBS-D ke TBS-1, NYMHY 3 (3 x 2,5 mm2 6.00 m¹ 84,900.00 509,400.00
c. Ceiling Speaker 3 Watt (Khusus Pagging) 8.00 bh 169,800.00 1,358,400.00
d. Ceiling Speaker 3 Watt 1.00 bh 169,800.00 169,800.00
e. Horn Speaker 15W 4.00 bh 1,061,400.00 4,245,600.00
f. Volume Control 1.00 bh 495,300.00 495,300.00
g. Titik instalasi Speaker & Volume Cantrol, NYMHY 14.00 ttk 398,000.00 5,572,000.00
- -
3 GROUND FLOOR - -
a. TBS- GF 1.00 bh 663,400.00 663,400.00
b. Kabel dari CTBS-D ke TBS-2, NYMHY 3 (3 x 2,5 mm2 10.00 m¹ 84,900.00 849,000.00
c. Ceiling Speaker 3 Watt (Khusus Pagging) 37.00 bh 169,800.00 6,282,600.00
d. Titik instalasi Speaker & Volume Cantrol, NYMHY 37.00 ttk 398,000.00 14,726,000.00
- -
4 LANTAI SATU - -
a. TBS- 1 1.00 bh 663,400.00 663,400.00
b. Kabel dari CTBS-D ke TBS-1, NYMHY 3 (3 x 2,5 mm2 6.00 m¹ 84,900.00 509,400.00
c. Ceiling Speaker 3 Watt (Khusus Pagging) 52.00 bh 169,800.00 8,829,600.00
d. Titik instalasi Speaker & Volume Cantrol, NYMHY 52.00 ttk 398,000.00 20,696,000.00
- -
5 LANTAI DUA - -
a. TBS- 2 1.00 bh 663,400.00 663,400.00
b. Kabel dari CTBS-D ke TBS-2, NYMHY 3 (3 x 2,5 mm2 10.00 m¹ 84,900.00 849,000.00
c. Ceiling Speaker 3 Watt (Khusus Pagging) 42.00 bh 169,800.00 7,131,600.00
d. Ceiling Speaker 3 Watt 5.00 bh 169,800.00 849,000.00
e. Volume Control 5.00 bh 495,300.00 2,476,500.00
f. Titik instalasi Speaker & Volume Cantrol, NYMHY 52.00 ttk 398,000.00 20,696,000.00
- -
6 LANTAI TIGA - -
a. TBS- 3 1.00 bh 663,400.00 663,400.00
b. Kabel dari CTBS-D ke TBS- 3, NYMHY 3 (3 x 2,5 mm 16.00 m¹ 84,900.00 1,358,400.00
c. Ceiling Speaker 3 Watt (Khusus Pagging) 42.00 bh 169,800.00 7,131,600.00
d. Ceiling Speaker 3 Watt 5.00 bh 169,800.00 849,000.00
e. Volume Control 5.00 bh 495,300.00 2,476,500.00

Pek. Non Standart Gedung D - page 46 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

f. Titik instalasi Speaker & Volume Cantrol, NYMHY 52.00 ttk 398,000.00 20,696,000.00
- -
7 LANTAI EMPAT - -
a. TBS- 4 1.00 bh 663,400.00 663,400.00
b. Kabel dari CTBS-D ke TBS- 4, NYMHY 3 (3 x 2,5 mm 16.00 m¹ 84,900.00 1,358,400.00
c. Ceiling Speaker 3 Watt (Khusus Pagging) 39.00 bh 169,800.00 6,622,200.00
d. Ceiling Speaker 3 Watt 5.00 bh 169,800.00 849,000.00
e. Volume Control 5.00 bh 495,300.00 2,476,500.00
f. Titik instalasi Speaker & Volume Cantrol, NYMHY 49.00 ttk 398,000.00 19,502,000.00
SUB TOTAL PEKERJAAN TATA SUARA - 458,296,500.00

6.5. PEKERJAAN FIRE ALARM


1 SENTRAL FIRE ALARM
a. Lokal FACP-D ( Semi Addressible ) lengkap peralat 1.00 unit 99,061,200.00 99,061,200.00
b. MDF 1.00 unit 7,606,500.00 7,606,500.00
c. Annunciator Panel 1.00 unit 19,458,400.00 19,458,400.00
d. UPS 1.00 unit 16,451,200.00 16,451,200.00
e. Kabel Interkoneksi AWG 18 1 Pair ke Master FACP - -
- -
2 LOWER GROUND - -
a. Terminal Box Fire / TBF-LG ( I/O ) modul 1.00 unit 7,606,500.00 7,606,500.00
b. Kabel Feeder, NYM 3 x 2,5 mm2 + Twited Shelded 1 6.00 m' 106,100.00 636,600.00
c. ROR + Module 10.00 bh 205,600.00 2,056,000.00
d. Fixed Temperature Detector + Module 17.00 bh 205,600.00 3,495,200.00
e. Smoke Detector + output modul 9.00 bh 636,800.00 5,731,200.00
e. Gas Detector + output modul 2.00 bh 1,061,400.00 2,122,800.00
f. Manual Breack Glass + Module 4.00 bh 238,800.00 955,200.00
g. Bell Alarm + output modul 4.00 bh 371,500.00 1,486,000.00
h. Visual Alarm 4.00 bh 459,900.00 1,839,600.00
g. Input/Uotpu Module 4.00 bh 1,326,700.00 5,306,800.00
i. Titik instalasi : - -
- Fireman Phone + instalasi 1.00 ttk 530,700.00 530,700.00
- Instalasi Detector, NYY4 x 1x 1,5 mm2 42.00 ttk 353,800.00 14,859,600.00
- Instalasi Bell & Indicator, NYY 4 x 1x 1,5 mm2 8.00 ttk 1,061,400.00 8,491,200.00
- Instalasi Flow Switch 1.00 ttk 1,061,400.00 1,061,400.00
j. AC/FCU -
k. IP PABX -
l. FIRE PUMP -
m. MDF F -
n. Genset Panel -
-
3 GROUND FLOOR -
a. Terminal Box Fire / TBF-GF ( I/O ) modul 1.00 unit 7,606,500.00 7,606,500.00
b. Kabel Feeder, NYM 3 x 2,5 mm2 + Twited Shelded 1 6.00 m' 106,100.00 636,600.00
c. ROR + Module 58.00 bh 205,600.00 11,924,800.00
d. Fixed Temperature Detector + Module 1.00 bh 205,600.00 205,600.00
e. Smoke Detector + output modul 2.00 bh 636,800.00 1,273,600.00
f. Manual Breack Glass + Module 4.00 bh 238,800.00 955,200.00
g. Bell Alarm + output modul 4.00 bh 371,500.00 1,486,000.00
h. Visual Alarm 4.00 bh 459,900.00 1,839,600.00
g. Input/Uotpu Module 4.00 bh 1,326,700.00 5,306,800.00
i. Titik instalasi : - -
- Fireman Phone + instalasi 1.00 ttk 530,700.00 530,700.00

Pek. Non Standart Gedung D - page 47 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

- Instalasi Detector, NYY4 x 1x 1,5 mm2 65.00 ttk 353,800.00 22,997,000.00


- Instalasi Bell & Indicator, NYY 4 x 1x 1,5 mm2 8.00 ttk 1,061,400.00 8,491,200.00
- Instalasi Flow Switch 1.00 ttk 1,061,400.00 1,061,400.00
- -
4 LANTAI SATU - -
a. Terminal Box Fire / TBF-1 ( I/O ) modul 1.00 unit 7,606,500.00 7,606,500.00
b. Kabel Feeder, NYM 3 x 2,5 mm2 + Twited Shelded 1 6.00 m' 106,100.00 636,600.00
c. ROR + Module 59.00 bh 205,600.00 12,130,400.00
d. Fixed Temperature Detector + Module 1.00 bh 205,600.00 205,600.00
e. Smoke Detector + output modul 8.00 bh 636,800.00 5,094,400.00
f. Manual Breack Glass + Module 4.00 bh 238,800.00 955,200.00
g. Bell Alarm + output modul 4.00 bh 371,500.00 1,486,000.00
h. Visual Alarm 4.00 bh 459,900.00 1,839,600.00
g. Input/Uotput Module 4.00 bh 1,326,700.00 5,306,800.00
i. Titik instalasi : - -
- Fireman Phone + instalasi 1.00 ttk 530,700.00 530,700.00
- Instalasi Detector, NYY4 x 1x 1,5 mm2 79.00 ttk 353,800.00 27,950,200.00
- Instalasi Bell & Indicator, NYY 4 x 1x 1,5 mm2 8.00 ttk 1,061,400.00 8,491,200.00
- Instalasi Flow Switch 1.00 ttk 1,061,400.00 1,061,400.00
- -
5 LANTAI DUA - -
a. Terminal Box Fire / TBF-2 ( I/O ) modul 1.00 unit 7,606,500.00 7,606,500.00
b. Kabel Feeder, NYM 3 x 2,5 mm2 + Twited Shelded 1 10.00 m' 106,100.00 1,061,000.00
c. ROR + Module 79.00 bh 205,600.00 16,242,400.00
d. Fixed Temperature Detector + Module 8.00 bh 205,600.00 1,644,800.00
e. Smoke Detector + output modul 7.00 bh 636,800.00 4,457,600.00
f. Manual Breack Glass + Module 4.00 bh 238,800.00 955,200.00
g. Bell Alarm + output modul 4.00 bh 371,500.00 1,486,000.00
h. Visual Alarm 4.00 bh 459,900.00 1,839,600.00
g. Input/Uotput Module 4.00 bh 1,326,700.00 5,306,800.00
i. Titik instalasi : - -
- Fireman Phone + instalasi 1.00 ttk 530,700.00 530,700.00
- Instalasi Detector, NYY4 x 1x 1,5 mm2 98.00 ttk 353,800.00 34,672,400.00
- Instalasi Bell & Indicator, NYY 4 x 1x 1,5 mm2 8.00 ttk 1,061,400.00 8,491,200.00
- Instalasi Flow Switch 1.00 ttk 1,061,400.00 1,061,400.00
- -
6 LANTAI TIGA - -
a. Terminal Box Fire/TBF-3 ( I/O ) modul 1.00 unit 7,606,500.00 7,606,500.00
b. Kabel Feeder, NYM 3 x 2,5 mm2 + Twited Shelded 1 15.00 m' 106,100.00 1,591,500.00
c. ROR + Module 79.00 bh 205,600.00 16,242,400.00
d. Fixed Temperature Detector + Module 1.00 bh 205,600.00 205,600.00
e. Smoke Detector + output modul 8.00 bh 636,800.00 5,094,400.00
f. Manual Breack Glass + Module 4.00 bh 238,800.00 955,200.00
g. Bell Alarm + output modul 4.00 bh 371,500.00 1,486,000.00
h. Visual Alarm 4.00 bh 459,900.00 1,839,600.00
g. Input/Uotput Module 4.00 bh 1,326,700.00 5,306,800.00
i. Titik instalasi : - -
- Fireman Phone + instalasi 1.00 ttk 530,700.00 530,700.00
- Instalasi Detector, NYY4 x 1x 1,5 mm2 92.00 ttk 353,800.00 32,549,600.00
- Instalasi Bell & Indicator, NYY 4 x 1x 1,5 mm2 8.00 ttk 1,061,400.00 8,491,200.00
- Instalasi Flow Switch 1.00 ttk 1,061,400.00 1,061,400.00
SUB TOTAL PEKERJAAN FIRE ALARM - 504,682,200.00

Pek. Non Standart Gedung D - page 48 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

6.6. PEKERJAAN SISTEM MATV


1 LOWER GROUND
- Coupler 1.00 bh 221,100.00 221,100.00
- Socket TV ( RCA ) 2.00 bh 49,500.00 99,000.00
- Instalasi Socket TV, Coaxial RG-11 dalam konduit 2.00 ttk 574,900.00 1,149,800.00
- -
2 GROUND FLOOR - -
- Coupler 3.00 bh 221,100.00 663,300.00
- Socket TV ( RCA ) 12.00 bh 49,500.00 594,000.00
- Instalasi Socket TV, Coaxial RG-11 dalam konduit 12.00 ttk 574,900.00 6,898,800.00
- -
3 LANTAI SATU - -
- Peralatan Utama - -
a. Line Amplifier 1.00 unit 2,211,200.00 2,211,200.00
b. Booster TV 1.00 unit 4,953,100.00 4,953,100.00
- Spliter 1.00 bh 221,100.00 221,100.00
- Coupler 2.00 bh 221,100.00 442,200.00
- Socket TV ( RCA ) 7.00 bh 49,500.00 346,500.00
- Instalasi Socket TV, Coaxial RG-11 dalam konduit 7.00 ttk 574,900.00 4,024,300.00
- -
4 LANTAI DUA - -
- Coupler 5.00 bh 221,100.00 1,105,500.00
- Socket TV ( RCA ) 17.00 bh 49,500.00 841,500.00
- Instalasi Socket TV, Coaxial RG-11 dalam konduit 17.00 ttk 574,900.00 9,773,300.00
- -
5
LANTAI TIGA - -
- Coupler 3.00 bh 221,100.00 663,300.00
- Socket TV ( RCA ) 11.00 bh 49,500.00 544,500.00
- Instalasi Socket TV, Coaxial RG-11 dalam konduit 11.00 ttk 574,900.00 6,323,900.00
SUB TOTAL PEKERJAAN SISTEM MATV 41,076,400.00

X PEKERJAAN NURSE CALL

1 LANTAI SATU
Peralatan Utama
1 Instalasi Kabel Main Line dari Gedung BTC ke Gedung A, 250.00 m 39,000.00 9,750,000.00
- - -
A. Instalasi Kabel dan Material Bantu - - -
1 Instalasi Kabel Ruangan CAT-5 (In Conduit PVC, Dia. 20m 300.00 m 39,000.00 11,700,000.00
2 UPS 1.00 unit 9,750,000.00 9,750,000.00
3 Switch Hub 16 Port PEO 1.00 unit 8,160,000.00 8,160,000.00
4 Rak server 1.00 unit 5,850,000.00 5,850,000.00
- - -
B. Equipment Coridor - - -
1 Room Controller ( NIRC3-WMN ) 3.00 unit 5,460,000.00 16,380,000.00
2 Corridor Message Display Lamp ( NICD-AB ) 2.00 unit 21,240,000.00 42,480,000.00
3 Corridor Lamp White With Max 4 Led Modules ( NICL2-W 6.00 unit 1,170,000.00 7,020,000.00
4 LED lamp Red ( NILD2-RAA ) 6.00 unit 570,000.00 3,420,000.00
5 LED lamp Green ( NILD2-GAA ) 6.00 unit 570,000.00 3,420,000.00
6 LED lamp Yellow ( NILD2-YAA ) 6.00 unit 570,000.00 3,420,000.00
- - -
C. Fixtures - - -
1 Doorside Module (NIDM-W3N) 9.00 unit 1,765,920.00 15,893,280.00

Pek. Non Standart Gedung D - page 49 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

2 Bedside Mod. White 3b sock ( NIBM2-W3S ) 9.00 unit 2,506,800.00 22,561,200.00


3 Patient Handset 1b 2M5 ( NIPH2-A1A ) 9.00 unit 840,840.00 7,567,560.00
4 Handset Parking Bracket ( 660380 ) 9.00 unit 420,000.00 3,780,000.00
5 Connector Terminal 4-pole ( NICT-4AA ) 36.00 unit 66,000.00 2,376,000.00
- - -
2 LANTAI DUA - - -
A. Instalasi Kabel dan Material Bantu - - -
1 Instalasi Kabel Ruangan CAT-5 (In Conduit PVC, Dia. 20m 350.00 m 39,000.00 13,650,000.00
2 UPS 1.00 unit 9,750,000.00 9,750,000.00
3 Switch Hub 16 Port PEO 1.00 unit 8,160,000.00 8,160,000.00
4 Rak server 1.00 unit 5,850,000.00 5,850,000.00
- - -
B. Equipment Coridor - - -
1 Room Controller ( NIRC3-WMN ) 3.00 unit 5,460,000.00 16,380,000.00
2 Corridor Message Display Lamp ( NICD-AB ) 2.00 unit 21,240,000.00 42,480,000.00
3 Corridor Lamp White With Max 4 Led Modules ( NICL2-W 6.00 unit 1,170,000.00 7,020,000.00
4 LED lamp Red ( NILD2-RAA ) 6.00 unit 570,000.00 3,420,000.00
5 LED lamp Green ( NILD2-GAA ) 6.00 unit 570,000.00 3,420,000.00
6 LED lamp Yellow ( NILD2-YAA ) 6.00 unit 570,000.00 3,420,000.00
- - -
C. Fixtures - - -
1 Doorside Module (NIDM-W3N) 11.00 unit 1,765,920.00 19,425,120.00
2 Bedside Mod. White 3b sock ( NIBM2-W3S ) 11.00 unit 2,506,800.00 27,574,800.00
3 Patient Handset 1b 2M5 ( NIPH2-A1A ) 11.00 unit 840,840.00 9,249,240.00
4 Handset Parking Bracket ( 660380 ) 11.00 unit 420,000.00 4,620,000.00
5 Connector Terminal 4-pole ( NICT-4AA ) 44.00 unit 66,000.00 2,904,000.00
- - -
3 LANTAI TIGA - - -
A. Instalasi Kabel dan Material Bantu - - -
1 Instalasi Kabel Ruangan CAT-5 (In Conduit PVC, Dia. 20m 350.00 m 39,000.00 13,650,000.00
2 UPS 1.00 unit 9,750,000.00 9,750,000.00
3 Switch Hub 16 Port PEO 1.00 unit 8,160,000.00 8,160,000.00
4 Rak server 1.00 unit 5,850,000.00 5,850,000.00
- - -
B. Equipment Coridor - - -
1 Room Controller ( NIRC3-WMN ) 3.00 unit 5,460,000.00 16,380,000.00
2 Corridor Message Display Lamp ( NICD-AB ) 2.00 unit 21,240,000.00 42,480,000.00
3 Corridor Lamp White With Max 4 Led Modules ( NICL2-W 3.00 unit 1,170,000.00 3,510,000.00
4 LED lamp Red ( NILD2-RAA ) 3.00 unit 570,000.00 1,710,000.00
5 LED lamp Green ( NILD2-GAA ) 3.00 unit 570,000.00 1,710,000.00
6 LED lamp Yellow ( NILD2-YAA ) 3.00 unit 570,000.00 1,710,000.00
- - -
C. Fixtures - - -
1 Doorside Module (NIDM-W3N) 6.00 unit 1,765,920.00 10,595,520.00
2 Bedside Mod. White 3b sock ( NIBM2-W3S ) 6.00 unit 2,506,800.00 15,040,800.00
3 Patient Handset 1b 2M5 ( NIPH2-A1A ) 6.00 unit 840,840.00 5,045,040.00
4 Handset Parking Bracket ( 660380 ) 6.00 unit 420,000.00 2,520,000.00
5 Connector Terminal 4-pole ( NICT-4AA ) 24.00 unit 66,000.00 1,584,000.00
- - -
D TEST & COMMISSIONING - - -
1 Test Commissioning dan Training 1.00 unit 48,000,000.00 48,000,000.00
-
SUB TOTAL PEKERJAAN NURSE CALL 538,546,560.00

Pek. Non Standart Gedung D - page 50 of 51


HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOL SAT
(Rp.) (Rp.)

XI PEKERJAAN RAK KABEL ELEKTRONIKA

1 LANTAI SATU
- Rak Kabel (Cable Tray), 300 x 50 mm, lengkap dengan co 166.00 m¹ 395,000.00 65,570,000.00
-
2 LANTAI DUA -
- Rak Kabel (Cable Tray), 300 x 50 mm, lengkap dengan co 166.00 m¹ 395,000.00 65,570,000.00
-
3 LANTAI TIGA -
- Rak Kabel (Cable Tray), 300 x 50 mm, lengkap dengan co 166.00 m¹ 395,000.00 65,570,000.00
-
4 LANTAI EMPAT -
- Rak Kabel (Cable Tray), 300 x 50 mm, lengkap dengan co 166.00 m¹ 395,000.00 65,570,000.00
-
5 SHAFT -
- Rak Kabel (Cable Tray), 300 x 50 mm, lengkap dengan co 30.00 m¹ 395,000.00 11,850,000.00

SUB TOTAL PEKERJAAN RAK KABEL ELEKTRONIKA 274,130,000.00

TOTAL PEKERJAAN NON STANDAR GEDUNG D

Pek. Non Standart Gedung D - page 51 of 51

Anda mungkin juga menyukai