Anda di halaman 1dari 2

REKAPITULASI

DAFTAR KUANTITAS DAN HARGA (DKH)


PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE 36 - PEMERINTAH KOTA SEMARANG


JUMLAH LANTAI : 3 LANTAI
LOKASI : KELURAHAN MANGUNHARJO, KECAMATAN TUGU, KOTA SEMARANG

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART 853.533.087,04

A.1. LANTAI 1 273.697.585,35


1. PEMIPAAN AIR BERSIH 26.414.624,07
2. PEMIPAAN AIR KOTOR & AIR BEKAS 84.001.692,58
3. PEMIPAAN AIR HUJAN 30.258.310,24
4. PEMIPAAN VENT 4.338.576,00
5. INSTALASI PANEL 26.674.987,50
6. INSTALASI KABEL TRAY 8.424.312,46
7. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK 28.852.582,50
8. INSTALASI PENERANGAN & STOP KONTAK 64.732.500,00

A.2. LANTAI 2 224.502.828,08


1. PEMIPAAN AIR BERSIH 19.706.833,52
2. PEMIPAAN AIR KOTOR & AIR BEKAS 42.886.863,10
3. PEMIPAAN AIR HUJAN 15.138.904,80
4. PEMIPAAN VENT 10.149.043,10
5. INSTALASI PANEL 30.364.687,50
6. INSTALASI KABEL TRAY 8.470.573,56
7. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK 30.540.667,50
8. INSTALASI PENERANGAN & STOP KONTAK 67.245.255,00

A.3. LANTAI 3 207.801.775,88


1. PEMIPAAN AIR BERSIH 19.545.275,72
2. PEMIPAAN AIR KOTOR & AIR BEKAS 26.347.368,70
3. PEMIPAAN AIR HUJAN 15.138.904,80
4. PEMIPAAN VENT 10.149.043,10
5. INSTALASI PANEL 30.364.687,50
6. INSTALASI KABEL TRAY 8.470.573,56
7. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK 30.540.667,50
8. INSTALASI PENERANGAN & STOP KONTAK 67.245.255,00

A.4. LANTAI ATAP 27.860.112,49


1. PEMIPAAN AIR BERSIH 6.243.955,71
2. PEMIPAAN AIR HUJAN 21.616.156,78
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA (DKH)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE 36 - PEMERINTAH KOTA SEMARANG


JUMLAH LANTAI : 3 LANTAI
LOKASI : KELURAHAN MANGUNHARJO, KECAMATAN TUGU, KOTA SEMARANG

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

A.5. PEKERJAAN UTILITAS 90.141.012,50


1. INSTALASI PANEL 90.141.012,50

A.6. PEKERJAAN PENANGKAL PETIR 29.529.772,74


1. INSTALASI 29.529.772,74

B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART 667.704.954,78

B.1. PEKERJAAN PEMADAM KEBAKARAN 5.397.571,62


I INSTALASI APAR 5.397.571,62

B.2 PEKERJAAN VENTILASI UDARA 81.555.562,00


I EXHAUST FAN 81.555.562,00

B.3. PEKERJAAN INSTALASI ELEKTRONIK 86.738.174,67


I PEKERJAAN SYSTEM TV 23.146.920,72
II PEKERJAAN FIRE ALARM 63.591.253,95

B.4. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN) 494.013.646,49


I PEKERJAAN INSTALASI PLAMBING 320.665.646,49
II PENYAMBUNGAN DAYA PLN 173.348.000,00

SUB TOTAL PEKERJAAN MEP : 1.521.238.041,82