DAFTAR HARGA DAN INDENTITAS

NamaPaket : PENGADAAN FASILITAS ASRAMA MAHASISWA KAB BINTUNI DI MANOKWARI


Lokasi :Kab. Manokwari
Tahun : 2023

No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUANJUMLAH HARGA

1 2 3 4 5 6
1 Mesin Babat Rumput Unit 2.00 10,000,000.00 20,000,000.00
2 Sofa Unit 3.00 19,000,000.00 57,000,000.00
3 Kursi Buah 100.00 670,000.00 67,000,000.00
4 sound Sistem Unit 1.00 85,000,000.00 85,000,000.00
5 Ac Standing Unit 2.00 39,600,000.00 79,200,000.00
6 Dispenser Unit 60.00 1,000,000.00 60,000,000.00
7 Gerobak Buah 2.00 2,000,000.00 4,000,000.00
8 Wifi Ls 1.00 1,200,000.00 1,200,000.00
9 Kasur Buah 60.00 2,500,000.00 150,000,000.00
10 Gorden Pintu dan Jendela M 34.00 1,050,000.00 35,700,000.00
11 Tempat sampah M 12.00 1,250,000.00 15,000,000.00

Jumlah 574,100,000.00
PPN 11 % 63,151,000.00
Total 637,251,000.00
REKAPITULASI HARGA

NamaPaket : REHABILITASI ASRAMA MAHASISWA KAB TELUK BINTUNI DI MANOKWARI


Lokasi :Kab. Manokwari
Tahun : 2023

NO URAIAN PEKERJAAN NILAI


1 2 3
A A PEKERJAAN STRUKTUR
1 PEKERJAAN PERSIAPAN 2,000,000.00
2 PEKERJAAN PINTU/JENDELA 33,500,000.00
3 PEKERJAAN KERAMIK 10,728,094.39
4 PEKERJAAN LANGIT - LANGIT 10,615,378.69
5 PEKERJAAN PENGECATAN 546,228,575.78
6 PEKERJAAN LAMPU DAN STOP KONTAK 28,238,250.00

JUMLAH 631,310,298.86
PAJAK PPN 11 % 69,444,132.87
TOTAL 700,754,431.74
DAFTAR HARGA DAN INDENTITAS

NamaPaket : REHABILITASI ASRAMA MAHASISWA KAB TELUK BINTUNI DI MANOKWARI


Lokasi :Kab.Tambrauw
Tahun : 2022

No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6
A PEKERJAAN STRUKTUR

A.1 PEKERJAAN PERSIAPAN


2 Mobilisasi & Demobilisasi ls 1.00 2,000,000.00 2,000,000.00

A.2 PEKERJAAN PINTU/JENDELA


2 Pasang Teralis Jendela Unit 1.00 8,500,000.00 8,500,000.00
3 Pasang Pintu Teralis Unit 10.00 2,500,000.00 25,000,000.00

A.3 PEKERJAAN KERAMIK


1 Pek. Bongkar Keramik Ls 1.00 4,000,000.00 4,000,000.00
2 Pasang Lantai Granit Tile Uk. 60 x 60 Polished m² 12.00 560,674.53 6,728,094.39

A.4 PEKERJAAN LANGIT - LANGIT

1 Pasang Rangka Langit - langit (60cm x 120cm), Kayu Kelas II m² 36.00 177,939.50 6,405,822.00
2 Pasang Multipleks 4mm m² 36.00 90,386.30 3,253,906.69
3 Pasang List Plafond Kayu m¹ 15.00 63,710.00 955,650.00
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6

A.5 PEKERJAAN PENGECATAN


1 Pengecatan Eksterior m² 1,984.80 57,360.85 113,849,815.08
2 Pengecatan Interior m² 4,637.60 83,124.19 385,496,720.36
3 Pengecatan Langit - Langit/Plafond m² 564.00 83,124.19 46,882,040.34

A.6 PEKERJAAN LAMPU DAN STOP KONTAK


1 Pengadaan Lampu Downlight bh 60.00 470,637.50 28,238,250.00
REKAPITULASI HARGA

NamaPaket : PEMBANGUNAN FASILITAS PENUNJANG ASRAMA MAHASISWA KAB TELUK BINTUNI DI MANOKWARI
Lokasi :Kab. Manokwari
Tahun : 2023

NO URAIAN PEKERJAAN NILAI


1 2 3
A A PEKERJAAN STRUKTUR
1 PEKERJAAN PERSIAPAN 11,244,725.00
2 PEKERJAAN BAK AIR PENAMPUNG 185,115,522.12
3 PEKERJAAN SUMUR BOR 221,000,000.00
4 PEKERJAAN PAGAR 7,500,000.00
5 PEKERJAAN INSTALASI PIPA AIR AIR KOTOR DAN AIR BEKAS 1,565,566.88

JUMLAH 426,425,813.99
PAJAK PPN 11 % 46,906,839.54
TOTAL 473,332,653.53
DAFTAR HARGA DAN INDENTITAS

NamaPaket : PEMBANGUNAN CABANG DINAS KEHUTANAN (CDK) & KPHP KAB. TAMBRAUW - PAPUA BARAT
Lokasi :Kab.Tambrauw
Tahun : 2022

No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6
A PEKERJAAN STRUKTUR

A.1 PEKERJAAN PERSIAPAN


1 Pengukuran dan Pematokan m¹ 30.00 108,157.50 3,244,725.00
2 Mobilisasi & Demobilisasi ls 1.00 5,000,000.00 5,000,000.00
3 Pembersihan Lapangan dan Perataan ls 1.00 3,000,000.00 3,000,000.00

A.2 PEKERJAAN BAK AIR PENAMPUNG


A.2.1 PEKERJAAN TANAH
1 Pek. Galian Tanah Biasa m³ 22.00 136,562.50 3,004,375.00
2 Pek. Urugan Tanah Untuk Peninggian Lantai Bangunan m³ 20.44 304,556.80 6,224,379.60
5 Pek. Urugan Pasir Bawah Pondasi Tbl. 5 Cm m³ 1.10 1,020,625.00 1,122,687.50
7 Pek. Urugan Pasir Bawah Lantai Tbl. 10 Cm m³ 1.50 1,020,625.00 1,530,937.50

A.2.2 PEKERJAAN BETON


1 Pekerjaan Beton
2 Pek. Lantai Kerja Tbl. 5 Cm
a. Pek. Beton Mutu f'c = 7,4 MPa (K.175) m³ 1.50 2,111,821.64 3,167,732.46
4 Pek. Beton Sloof Uk. 25 x 30
a.1 M³ Beton Mutu fc'=21.7MPa (K250 ), Slump (12±2 ) cm, w/c=0.56 "M m³ 1.65 2,138,638.60 3,528,753.69
b. Pek. Pembesian Dengan Besi Polos kg 261.58 16,926.46 4,427,624.09
c. Pek. Begesting Pondasi ( 2X Pakai ) m² 13.20 252,789.85 3,336,826.08
6 Pek. Beton Kolom Uk. 20 x20
a.1 M³ Beton Mutu fc'=21.7MPa (K250 ), Slump (12±2 ) cm, w/c=0.56 "M m³ 0.36 2,138,638.60 769,909.90
b. Pek. Pembesian Dengan Besi Polos kg 74.97 16,926.46 1,268,976.90
c. Pek. Begesting Kolom ( 2X Pakai ) m² 1.80 252,789.85 455,021.74
11 Pek. Balok Beton Uk. 15 x 20
a.1 M³ Beton Mutu fc'=21.7MPa (K250 ), Slump (12±2 ) cm, w/c=0.56 "M m³ 1.10 2,138,638.60 2,352,502.46
b. Pek. Pembesian Dengan Besi Polos kg 222.42 16,926.46 3,764,783.82
c. Pek. Begesting Balok ( 2X Pakai ) m² 10.00 252,789.85 2,527,898.55
11 Pek. Lantai Beton Tbl. 20 Cm
a.1 M³ Beton Mutu fc'=21.7MPa (K250 ), Slump (12±2 ) cm, w/c=0.56 "M m³ 6.00 2,138,638.60 12,831,831.59
b. Pek. Pembesian Dengan Besi Polos kg 562.48 16,926.46 9,520,796.70
c. Pek. Begesting Balok ( 2X Pakai ) m² 30.00 252,789.85 7,583,695.64
12 Pek. Plat Kanopi Tbl. 10 Cm
a.1 M³ Beton Mutu fc'=21.7MPa (K250 ), Slump (12±2 ) cm, w/c=0.56 "M m³ 2.94 2,138,638.60 6,279,042.92
b. Pek. Pembesian Dengan Besi Polos kg 281.24 16,926.46 4,760,398.35
c. Pek. Begesting Untuk Plat m² 29.36 355,093.85 10,425,555.58
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6
A.2.4 I PEKERJAAN DINDING/PASANGAN
1 Pasang Pondasi Batu Belah Camp. 1 PC : 4 Ps m³ 13.20 2,053,139.89 27,101,446.55
3 Pasang Batu Kosongan ( Aanstampeng ) m³ 5.50 1,412,119.50 7,766,657.25
4 Memasang 1 M² Dinding Batako m² 49.50 514,911.06 25,488,097.27
5 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm m² 123.20 123,750.00 15,246,000.16
8 Pek. Acian m² 123.20 48,816.72 6,014,219.83

D.1 PEKERJAAN INSTALASI PIPA AIR BERSIH


2 Pipa PPN PN 10 Ø 3/4 " m¹ 65.00 32,165.50 2,090,757.50

3 Instalasi Air Bersih


4 PipaAw Ø 1 " (Pipa Wash Out) m¹ 12.00 33,301.13 399,613.50
5 Stop Kran Ø 1 " bh 15.00 125,000.00 1,875,000.00
6 Pemasangan Profil Tank bh 2.00 5,125,000.00 10,250,000.00

B.1 PEKERJAAN SUMUR BOR


1 Pekerjaan Sumur Bor m 120.00 1,800,000.00 216,000,000.00
2 Pengadaan Mesin Air Jet Ls 2.00 2,500,000.00 5,000,000.00

B.2 PEKERJAAN PAGAR


1 Pasang Pintu Pagar Besi bh 1.00 7,500,000.00 7,500,000.00

D PEKERJAAN PLUMBING DAN SANITAIR

D.2 PEKERJAAN INSTALASI PIPA AIR AIR KOTOR DAN AIR BEKAS
2 Normalisasi Pipa PVC Type AW Ø 3 " m¹ 15.00 104371.125 1,565,566.88