Anda di halaman 1dari 309

REKAPITULASI

BILL OF QUANTITY (BOQ)


PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN BWS KALIMANTAN


Lokasi : KAB. KUBU RAYA
Satuan Kerja : SNVT PENYEDIAAN PERUMAHAN PROVINSI KALIMANTAN BARAT
Kegiatan : PENYEDIAAN RUMAH SUSUN
Tahun Anggaran : 2019

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

No. URAIAN PEKERJAAN

A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

A.1. LANTAI DASAR


1. PEMIPAAN AIR BERSIH -
2. PEMIPAAN AIR PANAS -
3. PEMIPAAN AIR KOTOR & AIR BEKAS -
4. PEMIPAAN AIR HUJAN -
5. PEMIPAAN VENT -
6. INSTALASI PANEL -
7. INSTALASI KABEL FEEDER -
8. INSTALASI KABEL TRAY -
9. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -
10. INSTALASI PENERANGAN & STOP KONTAK -

A.2. LANTAI 2 S/D 4


1. PEMIPAAN AIR BERSIH -
2. PEMIPAAN AIR PANAS -
3. PEMIPAAN AIR KOTOR & AIR BEKAS -
4. PEMIPAAN AIR HUJAN -
5. PEMIPAAN VENT -
6. INSTALASI PANEL -
7. INSTALASI KABEL FEEDER -
8. INSTALASI KABEL TRAY -
9. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -
10. INSTALASI PENERANGAN & STOP KONTAK -

A.3. LANTAI 5
1. PEMIPAAN AIR BERSIH -

Page 1 of 309
REKAPITULASI
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN BWS KALIMANTAN


Lokasi : KAB. KUBU RAYA
Satuan Kerja : SNVT PENYEDIAAN PERUMAHAN PROVINSI KALIMANTAN BARAT
Kegiatan : PENYEDIAAN RUMAH SUSUN
Tahun Anggaran : 2019

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

No. URAIAN PEKERJAAN

2. PEMIPAAN AIR PANAS -


3. PEMIPAAN AIR KOTOR & AIR BEKAS -
4. PEMIPAAN AIR HUJAN -
5. PEMIPAAN VENT -
6. INSTALASI PANEL -
7. INSTALASI KABEL FEEDER -
8. INSTALASI KABEL TRAY -
9. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -
10. INSTALASI PENERANGAN & STOP KONTAK -

A.4. LANTAI 6
1. PEMIPAAN AIR BERSIH -
2. PEMIPAAN AIR PANAS -
3. PEMIPAAN AIR KOTOR & AIR BEKAS -
4. PEMIPAAN AIR HUJAN -
5. PEMIPAAN VENT -
6. INSTALASI PANEL -
7. INSTALASI KABEL FEEDER -
8. INSTALASI KABEL TRAY -
9. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -

Page 2 of 309
REKAPITULASI
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN BWS KALIMANTAN


Lokasi : KAB. KUBU RAYA
Satuan Kerja : SNVT PENYEDIAAN PERUMAHAN PROVINSI KALIMANTAN BARAT
Kegiatan : PENYEDIAAN RUMAH SUSUN
Tahun Anggaran : 2019

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

No. URAIAN PEKERJAAN

10. INSTALASI PENERANGAN & STOP KONTAK -

A.5. LANTAI ATAP


1. PEMIPAAN AIR BERSIH -
2. PEMIPAAN AIR HUJAN -
3. INSTALASI PANEL -

A.6. PEKERJAAN UTILITAS


1. INSTALASI PANEL -
2. INSTALASI KABEL FEEDER -
3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -
4. INSTALASI PENERANGAN & STOP KONTAK -

A.7. PEKERJAAN SISTEM PENTANAHAN


1. INSTALASI -

A.8. PEKERJAAN PENANGKAL PETIR


1. INSTALASI -

B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

B.1. PEKERJAAN PEMADAM KEBAKARAN


I LANTAI DASAR -
II LANTAI 2 S/D 6 -
B.2. PEKERJAAN VENTILASI UDARA
B.3. PEKERJAAN INSTALASI ELEKTRONIK
I PEKERJAAN MATV -
II PEKERJAAN FIRE ALARM -

Page 3 of 309
REKAPITULASI
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN BWS KALIMANTAN


Lokasi : KAB. KUBU RAYA
Satuan Kerja : SNVT PENYEDIAAN PERUMAHAN PROVINSI KALIMANTAN BARAT
Kegiatan : PENYEDIAAN RUMAH SUSUN
Tahun Anggaran : 2019

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

No. URAIAN PEKERJAAN

III PEKERJAAN TATA SUARA -


IV PEKERJAAN CCTV -
V PEKERJAAN ACCESS CONTROL / CARD -
B.4. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)
I PEKERJAAN INSTALASI PLAMBING -
II PENYAMBUNGAN DAYA PLN -
III PEKERJAAN INSTALASI KABEL FEEDER -
IV PEKERJAAN INSTALASI HYDRANT -

B.5. PEKERJAAN TRANSPORTASI DALAM GEDUNG


I PEKERJAAN GONDOLA -
II PEKERJAAN LIFT -

SUB TOTA

Page 4 of 309
EKAPITULASI
OF QUANTITY (BOQ)
MEKANIKAL & ELEKTRIKAL

JUMLAH HARGA
IAN PEKERJAAN
(Rp.)

Page 5 of 309
EKAPITULASI
OF QUANTITY (BOQ)
MEKANIKAL & ELEKTRIKAL

JUMLAH HARGA
IAN PEKERJAAN
(Rp.)

Page 6 of 309
EKAPITULASI
OF QUANTITY (BOQ)
MEKANIKAL & ELEKTRIKAL

JUMLAH HARGA
IAN PEKERJAAN
(Rp.)

-
-

Page 7 of 309
EKAPITULASI
OF QUANTITY (BOQ)
MEKANIKAL & ELEKTRIKAL

JUMLAH HARGA
IAN PEKERJAAN
(Rp.)

SUB TOTAL : -

Page 8 of 309
REKAPITULASI
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN BWS KALIMANTAN


Lokasi : KAB. KUBU RAYA
Satuan Kerja : SNVT PENYEDIAAN PERUMAHAN PROVINSI KALIMANTAN BARAT
Kegiatan : PENYEDIAAN RUMAH SUSUN
Tahun Anggaran : 2019

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN

A. PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART

A.1. LANTAI DASAR

1. PEMIPAAN AIR BERSIH


Pipa PPR PN - 10 (Incl. Fitting & Accessories)
- PPR PN - 10 dia. 15
- PPR PN - 10 dia. 20
- PPR PN - 10 dia. 25
- PPR PN - 10 dia. 40 (Riser)
- PPR PN - 10 dia. 50 (Riser)
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 25
- dia. 15
- Meter Air c/w BV dia. 25

2. PEMIPAAN AIR PANAS


Pipa PPR PN - 20 (Incl. Fitting & Accessories)
- PPR PN - 20 dia. 15
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 15
- Elektrik Water Heater kapasitas 15 liter

3. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 200 : AK Horisontal
- dia. 150 : AK Horisontal
- dia. 100 : AK Horisontal
- dia. 200 : ABK Horisontal
- dia. 150 : ABK Horisontal
- dia. 100 : ABK Horisontal
- dia. 80 : ABK Horisontal
- dia. 50 : ABK Horisontal
- dia. 40 : ABK Horisontal
- dia. 150 ( riser pipa air kotor )
- dia. 80 ( riser pipa air bekas )
Clean Out (CO)
- CO, dia. 100
- FCO, dia. 80

4. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 150 ( Horisontal )
- dia. 100 ( pipa tegak )
- dia. 80 ( pipa balkon )

5. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
- Dia. 25

6. INSTALASI PANEL
Pengadaan dan pemasangan SDP-LT.1
dengan komponen panel, sbb :
- MCCB 3P, 300 A
- MCCB 3P, 63 A
- MCCB 3P, 50 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 3 x 2 A
- Indicator Lamp
- Rel MCB 3P
- CT 300A/50A
- Cu Bar 4 x (30 x 5)mm2 + 1 x (15x5) mm2
- Accessories & Termination
- Box Panel

Pengadaan dan pemasangan DP-LT.Dasar


dengan komponen panel, sbb :
- MCCB 3P, 50 A
- MCB 3P, 20 A
- MCB 1P, 16 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 3 x 2 A
- Indicator Lamp
- Rel MCB 3P
- CT 50A/5A
- Cu Bar 5 x (12x 2)mm2
- Cu Bar 4 x (12x 2)mm2 + 1 x (12x2) mm2
- Accessories & Termination
- Box Panel

Pengadaan dan pemasangan DP-EMG

Pengadaan dan pemasangan DP-PL

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb :


- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

7. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari SDP :
- NYY 1 x (4 x 16 mm2) + NYA 16 mm2 ke DP-LT.Dasar

b. Kabel Distribusi Daya dari DP-LT.Dasar ke :


- NYM 3 x 4 mm2 ke P-Unit/1
- NYM 3 x 4 mm2 ke P-Unit/2
- NYM 3 x 4 mm2 ke P-Unit/3
- NYM 3 x 4 mm2 ke P-Unit/4
- NYM 3 x 4 mm2 ke P-Unit/5
- NYM 3 x 4 mm2 ke P-Unit/6
- NYM 3 x 4 mm2 ke P-Unit/7
- NYM 3 x 4 mm2 ke P-Unit/8

8. INSTALASI KABEL TRAY


- Kabel Tray W300 x H100 : Elektrikal
- Kabel Tray W300 x H100 : Elektronik
Fitting-Fitting :
- Elbow W300 x H100
- Material bantu ( mur, baut, hanger rod, supporting, dll )

9. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


- Lampu DL SL 13 Watt
- Lampu DL LED 7 Watt
- Lampu DL EM 7 Watt
- Lampu Baret 10 Watt
- Lampu TL Balk EM 36 Watt
- Lampu Exit LED 8 Watt
- Lampu 26 Watt
- Stop Kontak 200 watt
- Saklar 1 gang
- Saklar 2 gang
- Lampu DL SL 13 Watt
- Lampu DL LED 7 Watt
- Lampu Baret 10 Watt
- Stop Kontak 200 watt
- Stop Kontak AC 375 watt
- Saklar 1 gang
- Saklar 2 gang

10. INSTALASI PENERANGAN & STOP KONTAK


- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak

A.2. LANTAI 2 s/d 4

1. PEMIPAAN AIR BERSIH


Pipa PPR PN - 10 (Incl. Fitting & Accessories)
- PPR PN - 10 dia. 15
- PPR PN - 10 dia. 20
- PPR PN - 10 dia. 25
- PPR PN - 10 dia. 40 (Riser)
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 25
- dia. 15
- Meter Air c/w BV dia. 25

2. PEMIPAAN AIR PANAS


Pipa PPR PN - 20 (Incl. Fitting & Accessories)
- PPR PN - 20 dia. 15
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 15
- Elektrik Water Heater kapasitas 15 liter

3. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 : AK Horisontal
- dia. 80 : ABK Horisontal
- dia. 50 : ABK Horisontal
- dia. 40 : ABK Horisontal
- dia. 150 ( riser pipa air kotor )
- dia. 80 ( riser pipa air bekas )
Clean Out (CO)
- CO, dia. 100
- CO, dia. 80
- FCO, dia. 80

4. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak )
- dia. 80 ( pipa balkon )

5. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
- Dia. 25

6. INSTALASI PANEL
Pengadaan dan pemasangan DP-LT.2 s/d 4
dengan komponen panel, sbb :
- MCCB 3P, 50 A
- MCB 3P, 20 A
- MCB 1P, 16 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 3 x 2 A
- Indicator Lamp
- Rel MCB 3P
- CT 50A/5A
- Cu Bar 5 x (12x 2)mm2
- Cu Bar 4 x (12x 2)mm2 + 1 x (12x2) mm2
- Accessories & Termination
- Box Panel

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb :


- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

7. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari SDP :
- NYY 1 x (4 x 16 mm2) + NYA 16 mm2 ke DP-LT. 2 s/d 4

b. Kabel Distribusi Daya dari DP-LT.2 s/d 4 ke :


- NYM 3 x 4 mm2 ke P-Unit/1
- NYM 3 x 4 mm2 ke P-Unit/2
- NYM 3 x 4 mm2 ke P-Unit/3
- NYM 3 x 4 mm2 ke P-Unit/4
- NYM 3 x 4 mm2 ke P-Unit/5
- NYM 3 x 4 mm2 ke P-Unit/6
- NYM 3 x 4 mm2 ke P-Unit/7
- NYM 3 x 4 mm2 ke P-Unit/8
- NYM 3 x 4 mm2 ke P-Unit/9
- NYM 3 x 4 mm2 ke P-Unit/10
- NYM 3 x 4 mm2 ke P-Unit/11
- NYM 3 x 4 mm2 ke P-Unit/12

8. INSTALASI KABEL TRAY


- Kabel Tray W300 x H100 : Elektrikal
- Kabel Tray W300 x H100 : Elektronik
Fitting-Fitting :
- Elbow W300 x H100
- Material bantu ( mur, baut, hanger rod, supporting, dll )

9. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


- Lampu DL EM 7 Watt
- Lampu Baret 10 Watt
- Lampu TL Balk EM 36 Watt
- Lampu Exit LED 8 Watt
- Stop Kontak 200 watt
- Saklar 1 gang
- Saklar 2 gang

- Lampu DL SL 13 Watt
- Lampu DL LED 7 Watt
- Lampu Baret 10 Watt
- Stop Kontak 200 watt
- Stop Kontak AC 375 watt
- Saklar 1 gang
- Saklar 2 gang

10. INSTALASI PENERANGAN & STOP KONTAK


- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak

A.3. LANTAI 5

1. PEMIPAAN AIR BERSIH


Pipa PPR PN - 10 (Incl. Fitting & Accessories)
- PPR PN - 10 dia. 15
- PPR PN - 10 dia. 20
- PPR PN - 10 dia. 25
- PPR PN - 10 dia. 40 (Riser)
- PPR PN - 10 dia. 80
- PPR PN - 10 dia. 100
- PPR PN - 10 dia. 100 (Riser)
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 25
- dia. 15
- Meter Air c/w BV dia. 25

2. PEMIPAAN AIR PANAS


Pipa PPR PN - 20 (Incl. Fitting & Accessories)
- PPR PN - 20 dia. 15
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 15
- Elektrik Water Heater kapasitas 15 liter

3. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 : AK Horisontal
- dia. 80 : ABK Horisontal
- dia. 50 : ABK Horisontal
- dia. 40 : ABK Horisontal
- dia. 150 ( riser pipa air kotor )
- dia. 80 ( riser pipa air bekas )
Clean Out (CO)
- FCO, dia. 80

4. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak )
- dia. 80 ( pipa balkon )

5. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
- Dia. 25

6. INSTALASI PANEL
Pengadaan dan pemasangan DP-LT.5
dengan komponen panel, sbb :
- MCCB 3P, 50 A
- MCB 3P, 20 A
- MCB 1P, 16 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 3 x 2 A
- Indicator Lamp
- Rel MCB 3P
- CT 50A/5A
- Cu Bar 5 x (12x 2)mm2
- Cu Bar 4 x (12x 2)mm2 + 1 x (12x2) mm2
- Accessories & Termination
- Box Panel

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb :


- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

7. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari SDP :
- NYY 1 x (4 x 16 mm2) + NYA 16 mm2 ke DP-LT. 5
b. Kabel Distribusi Daya dari DP-LT.5 ke :
- NYM 3 x 4 mm2 ke P-Unit/1
- NYM 3 x 4 mm2 ke P-Unit/2
- NYM 3 x 4 mm2 ke P-Unit/3
- NYM 3 x 4 mm2 ke P-Unit/4
- NYM 3 x 4 mm2 ke P-Unit/5
- NYM 3 x 4 mm2 ke P-Unit/6
- NYM 3 x 4 mm2 ke P-Unit/7
- NYM 3 x 4 mm2 ke P-Unit/8
- NYM 3 x 4 mm2 ke P-Unit/9
- NYM 3 x 4 mm2 ke P-Unit/10
- NYM 3 x 4 mm2 ke P-Unit/11
- NYM 3 x 4 mm2 ke P-Unit/12

8. INSTALASI KABEL TRAY


- Kabel Tray W300 x H100 : Elektrikal
- Kabel Tray W300 x H100 : Elektronik
Fitting-Fitting :
- Elbow W300 x H100
- Material bantu ( mur, baut, hanger rod, supporting, dll )

9. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


- Lampu DL EM 7 Watt
- Lampu Baret 10 Watt
- Lampu TL Balk EM 36 Watt
- Lampu Exit LED 8 Watt
- Stop Kontak 200 watt
- Saklar 1 gang
- Saklar 2 gang

- Lampu DL SL 13 Watt
- Lampu DL LED 7 Watt
- Lampu Baret 10 Watt
- Stop Kontak 200 watt
- Stop Kontak AC 375 watt
- Saklar 1 gang
- Saklar 2 gang

10. INSTALASI PENERANGAN & STOP KONTAK


- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak

A.4. LANTAI 6

1. PEMIPAAN AIR BERSIH


Pipa PPR PN - 10 (Incl. Fitting & Accessories)
- PPR PN - 10 dia. 15
- PPR PN - 10 dia. 20
- PPR PN - 10 dia. 25
- PPR PN - 10 dia. 40 (Riser)
- PPR PN - 10 dia. 25
- PPR PN - 10 dia. 32
- PPR PN - 10 dia. 40
- PPR PN - 10 dia. 50
- PPR PN - 10 dia. 100
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 25
- dia. 15
- Meter Air c/w BV dia. 25

2. PEMIPAAN AIR PANAS


Pipa PPR PN - 20 (Incl. Fitting & Accessories)
- PPR PN - 20 dia. 15
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 15
- Elektrik Water Heater kapasitas 15 liter

3. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 : AK Horisontal
- dia. 80 : ABK Horisontal
- dia. 50 : ABK Horisontal
- dia. 40 : ABK Horisontal
- dia. 150 ( riser pipa air kotor )
- dia. 80 ( riser pipa air bekas )
Clean Out (CO)
- FCO, dia. 80

4. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak )
- dia. 80 ( pipa balkon )

5. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80
- Dia. 100
- Dia. 80 ( pipa riser )
- Dia. 25

6. INSTALASI PANEL
Pengadaan dan pemasangan DP-LT.6
dengan komponen panel, sbb :
- MCCB 3P, 50 A
- MCB 3P, 20 A
- MCB 1P, 16 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 3 x 2 A
- Indicator Lamp
- Rel MCB 3P
- CT 50A/5A
- Cu Bar 5 x (12x 2)mm2
- Cu Bar 4 x (12x 2)mm2 + 1 x (12x2) mm2
- Accessories & Termination
- Box Panel

Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb :


- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

7. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari SDP :
- NYY 1 x (4 x 16 mm2) + NYA 16 mm2 ke DP-LT. 6

b. Kabel Distribusi Daya dari DP-LT.6 ke :


- NYM 3 x 4 mm2 ke P-Unit/1
- NYM 3 x 4 mm2 ke P-Unit/2
- NYM 3 x 4 mm2 ke P-Unit/3
- NYM 3 x 4 mm2 ke P-Unit/4
- NYM 3 x 4 mm2 ke P-Unit/5
- NYM 3 x 4 mm2 ke P-Unit/6
- NYM 3 x 4 mm2 ke P-Unit/7
- NYM 3 x 4 mm2 ke P-Unit/8
- NYM 3 x 4 mm2 ke P-Unit/9
- NYM 3 x 4 mm2 ke P-Unit/10
- NYM 3 x 4 mm2 ke P-Unit/11
- NYM 3 x 4 mm2 ke P-Unit/12

8. INSTALASI KABEL TRAY


- Kabel Tray W300 x H100 : Elektrikal
- Kabel Tray W300 x H100 : Elektronik
Fitting-Fitting :
- Elbow W300 x H100
- Material bantu ( mur, baut, hanger rod, supporting, dll )

9. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


- Lampu DL EM 7 Watt
- Lampu Baret 10 Watt
- Lampu TL Balk EM 36 Watt
- Lampu Exit LED 8 Watt
- Stop Kontak 200 watt
- Saklar 1 gang
- Saklar 2 gang

- Lampu DL SL 13 Watt
- Lampu DL LED 7 Watt
- Lampu Baret 10 Watt
- Stop Kontak 200 watt
- Stop Kontak AC 375 watt
- Saklar 1 gang
- Saklar 2 gang

10. INSTALASI PENERANGAN & STOP KONTAK


- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak

A.5. LANTAI ATAP

1. PEMIPAAN AIR BERSIH


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 100
- PVC AW dia. 50
- PVC AW dia. 32 (Pipa Drain)
- PVC AW dia. 150 (Header)

Peralatan Katup-katup
(Ball Valve & Gate Valve)
- BV dia. 50
- GV dia. 100
- GV dia. 50
- CV dia. 50
- FJ dia. 50
- WLC + Panel
- Pressure Indikator (PI)

2. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
Roof Drain, Cast Iron
- dia. 80

3. INSTALASI PANEL
a. DP-LT.Atap
Pengadaan dan pemasangan DP-LT.Atap

b. PB-LT.Atap
Pengadaan dan pemasangan PB-LT.Atap

c. PB-Lift.P1
Pengadaan dan pemasangan PB-Lift.P1

d. P-Booster
Pengadaan dan pemasangan PB-Booster

e. P-EMG Atap
Pengadaan dan pemasangan PP-EMG Atap
f. PB-TK.1
Pengadaan dan pemasangan PB-TK.1

g. PB-PF.1
Pengadaan dan pemasangan PB-PF.1

h. PK-LS
Pengadaan dan pemasangan PK-LS

4. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


- Lampu taman HPL - N 2 x 80W Tiang 6 - 12 m

5. INSTALASI PENERANGAN & STOP KONTAK


- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu

A.6. PEKERJAAN UTILITAS

1. INSTALASI PANEL

a. P-PLN
- MCCB 3P, 300 A : 1 bh
- Accessories & Termination : 1 lot
- Box Panel : 1 unit

b. PUTR
Pengadaan dan pemasangan PUTR

c. Kapasitor Bank 200 KVAR


Pengadaan dan pemasangan Kapasitor Bank

2. INSTALASI KABEL FEEDER


- N2XSEBY 3 x 120 mm² + BC 120 mm² Dari P-PLN ke PUTM
- N2XSEBY 3 x 120 mm² + BC 120 mm² Dari PUTM ke Transformator
- NYY 4 x (1c x 300) mm2 + NYA 150 mm² Dari Transformator ke PUTR
- NYY 4 x (1c x 300) mm2 + NYA 150 mm² Dari PUTR ke Kapasitor Bank
- NYY 4 x (1c x 150) mm2 + NYA 70 mm² Dari PUTR ke SDP-1
- NYY 4 x (1c x 16) mm2 + NYA 16 mm² Dari PUTR ke DP-PL
- NYY 4 x (1c x 16) mm2 + NYA 16 mm² Dari PUTR ke DP-EMG
- NYY 4 x 10 mm² Dari PUTR ke DP-LT. Atap
- NYY 4 x 4 mm² + NYA 4 mm² Dari PUTR ke PB-LT. Atap
- NYY 1 x (4x16 mm² )+ BC 10 mm² Dari PUTR ke PP-EMG Atap
- NYY 4 x 4 mm² + NYA 4 mm² Dari PUTR ke PB-Lift P1
- NYY 4 x 4 mm² + NYA 4 mm² Dari PUTR ke PB-Booster
- FRC 4 x 4 mm² + NYA 4 mm² Dari PUTR ke PB-TK.1
- FRC 4 x 10 mm² + BC 10 mm² Dari PUTR ke PB-PF.1
- FRC 4 x 10 mm² + BC 10 mm² Dari PUTR ke PK-LS

- NYY 8 x (1C x 120 mm²) + BC 120 mm² Dari Genset ke PKG


- NYY 8 x (1C x 240 mm²) + BC 120 mm² Dari PKG ke PUTR
3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
a. Ruang Pompa
- TL 1 x 18 W, TL Balk Type
- Stop Kontak 1P, 220 Volt, 13A, Wall Type
- Saklar 1 gang

b. Lampu Taman
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt

4. INSTALASI PENERANGAN & STOP KONTAK


a. Ruang Pompa
- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
- NYA 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak

b. Lampu Taman
- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman

- Testing & Commissioning

A.7. PEKERJAAN SISTEM PENTANAHAN

1. INSTALASI
Pentanahan (Grounding) Netral Sistem & Pentanahan Body

a. - Body Panel
Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm )
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material
- Kabel BC 70 mm2
- Testing & Commissioning

b. - Body Peralatan pada Sistem Elektronik


Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm )
- Termination R.Supporting Material
- Kabel BC 70 mm2
- Testing & Commissioning

A.8. PEKERJAAN PENANGKAL PETIR

1. INSTALASI
- Split penyalur petir non radio aktif radius R-80 meter
- Tiang pipa dia 65 = 5 meter + acessories
- Down Conduktor BC 50mm + accessories
- Grounding System max. 3 ohm
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Biaya Instalasi
- Material Bantu
- Testing & Comissioning included perijinan dari DEPNAKER
- Bracket, Seal , Test Box , dls
HARGA SATUAN TOTAL HARGA
SAT VOL
(Rp) (Rp)

m 153.40 - -
m 140.04 - -
m 45.52 - -
m 32.00 - -
m 4.00 - -

bh 8.00 - -
bh 8.00 - -
bh 8.00 - -

m 54.66 - -

bh 8.00 - -
bh 8.00 - -

-
`
m 10.65 - -
m 46.24 - -
m 29.48 - -
m 10.40 - -
m 38.06 - -
m 34.74 - -
m 18.40 - -
m 23.05 - -
m 22.12 - -
m 32.00 - -
m 32.00 - -

bh 2.00 - -
bh 8.00 - -

m 107.86 - -
m 71.18 - -
m 15.17 - -

m 32.00 - -
m 171.64 - -

-
unit 1.00 - -

unit 1.00 - -
unit 1.00 - -

unit 1.00 - -

unit 8.00 - -

m 35.00 - -

m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -

-
m 58.92 - -
m 58.75 - -

bh 4.00 - -
lot 1.00 - -

-
bh 3.00 - -
bh 6.00 - -
bh 6.00 - -
bh 11.00 - -
bh 31.00 - -
bh 8.00 - -
bh 18.00 - -
bh 3.00 - -
bh 11.00 - -
bh 12.00 - -
bh 40.00 - -
bh 16.00 - -
bh 8.00 - -
bh 72.00 - -
bh 24.00 - -
bh 32.00 - -
bh 16.00 - -

-
titik 147.00 - -
titik 99.00 - -

m 451.73 - -
m 583.20 - -
m 183.92 - -
m 144.00 - -

bh 36.00 - -
bh 36.00 - -
bh 36.00 - -

m 245.95 - -

bh 36.00 - -
bh 36.00 - -

m 112.91 - -
m 104.94 - -
m 103.72 - -
m 99.54 - -
m 144.00 - -
m 144.00 - -

bh 2.00 - -
bh 2.00 - -
bh 36.00 - -

-
m 144.00 - -
m 45.50 - -

m 144.00 - -
m 694.80 - -

-
unit 3.00 - -

unit 36.00 - -

m 105.00 - -

m 45.00 - -
m 60.00 - -
m 75.00 - -
m 90.00 - -
m 105.00 - -
m 120.00 - -
m 45.00 - -
m 60.00 - -
m 75.00 - -
m 90.00 - -
m 105.00 - -
m 120.00 - -

-
m 176.75 - -
m 176.24 - -

bh 12.00 - -
lot 3.00 - -

-
bh 18.00 - -
bh 15.00 - -
bh 42.00 - -
bh 30.00 - -
bh 12.00 - -
bh 18.00 - -
bh 6.00 - -
-
bh 180.00 - -
bh 72.00 - -
bh 36.00 - -
bh 324.00 - -
bh 108.00 - -
bh 144.00 - -
bh 72.00 - -

-
titik 393.00 - -
titik 444.00 - -

m 150.58 - -
m 194.40 - -
m 61.31 - -
m 48.00 - -
m 30.31 - -
m 53.67 - -
m 8.00 - -

bh 12.00 - -
bh 12.00 - -
bh 12.00 - -

m 81.98 - -

bh 12.00 - -
bh 12.00 - -

m 30.64 - -
m 27.60 - -
m 34.57 - -
m 33.18 - -
m 48.00 - -
m 48.00 - -

bh 12.00 - -

m 48.00 - -
m 15.17 - -

m 48.00 - -
m 231.60 - -

-
unit 1.00 - -

unit 12.00 - -

m 35.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 35.00 - -
m 40.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 35.00 - -
m 40.00 - -

-
m 58.92 - -
m 58.75 - -

bh 4.00 - -
lot 1.00 - -

-
bh 6.00 - -
bh 5.00 - -
bh 14.00 - -
bh 10.00 - -
bh 4.00 - -
bh 6.00 - -
bh 2.00 - -

bh 60.00 - -
bh 24.00 - -
bh 12.00 - -
bh 108.00 - -
bh 36.00 - -
bh 48.00 - -
bh 24.00 - -

-
titik 131.00 - -
titik 148.00 - -

m 150.58 - -
m 194.40 - -
m 61.31 - -
m 48.00 - -
m 28.92 - -
m 9.86 - -
m 22.16 - -
m 14.86 - -
m 8.00 - -

bh 12.00 - -
bh 12.00 - -
bh 12.00 - -

m 81.98 - -

bh 12.00 - -
bh 12.00 - -

m 30.64 - -
m 27.60 - -
m 34.57 - -
m 33.18 - -
m 48.00 - -
m 48.00 - -
-
bh 12.00 - -

m 48.00 - -
m 15.17 - -

m 27.68 - -
m 32.04 - -
m 48.00 - -
m 231.60 - -

-
unit 1.00 - -
unit 12.00 - -

m 35.00 - -

m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 35.00 - -
m 40.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 35.00 - -
m 40.00 - -

-
m 58.92 - -
m 58.75 - -

bh 4.00 - -
lot 1.00 - -

-
bh 6.00 - -
bh 5.00 - -
bh 14.00 - -
bh 10.00 - -
bh 4.00 - -
bh 6.00 - -
bh 2.00 - -
-
bh 60.00 - -
bh 24.00 - -
bh 12.00 - -
bh 108.00 - -
bh 36.00 - -
bh 48.00 - -
bh 24.00 - -

-
titik 131.00 - -
titik 148.00 - -

m 40.00 - -
m 25.00 - -
m 6.00 - -
m 2.75 - -

bh 2.00 - -
bh 2.00 - -
bh 4.00 - -
bh 2.00 - -
bh 2.00 - -
set 1.00 - -
set 1.00 - -

bh 12.00 - -

-
unit 1.00 - -

unit 1.00 - -

unit 1.00 - -

unit 1.00 - -

unit 1.00 - -
unit 1.00 - -

unit 1.00 - -

unit 1.00 - -

unit 12.00 - -

titik 12.00 - -

unit 1.00 by PLN by PLN

unit 1.00 - -

unit 1.00 - -

-
m 30.00 - -
m 25.00 - -
m 30.00 - -
m 25.00 - -
m 25.00 - -
m 25.00 - -
m 25.00 - -
m 44.00 - -
m 54.00 - -
m 64.00 - -
m 74.00 - -
m 84.00 - -
m 94.00 - -
m 104.00 - -

m 25.00 - -
m 25.00 - -
-

bh 2.00 - -
bh 1.00 - -
bh 2.00 - -

bh 16.00 - -

ttk 2.00 - -
ttk 1.00 - -

ttk 16.00 - -

lot 1.00 - -

bh 1.00 - -

lot 1.00 - -
m 30.00 - -
lot 1.00 - -

bh 1.00 - -
lot 1.00 - -
m 30.00 - -
lot 1.00 - -

unit 1.00 - -
unit 2.00 - -
m' 102.00 - -
lot 2.00 - -

lot 1.00 - -
lot 1.00 - -
lot 1.00 - -
lot 1.00 - -
REKAPITULASI
BILL OF QUANTITY ( BOQ )
PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : PEMBANGUNAN RUMAH SUSUN BWS KALIMANTAN


Lokasi : KAB. KUBU RAYA
Satuan Kerja : SNVT PENYEDIAAN PERUMAHAN PROVINSI KALIMANTAN BARAT
Kegiatan : PENYEDIAAN RUMAH SUSUN
Tahun Anggaran : 2019

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN

B. PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART

B.1. PEKERJAAN PEMADAM KEBAKARAN

B.1..1 LANTAI DASAR

1. PEMIPAAN HYDRANT
RUANG POMPA
Pipa Sch 40 (Incl. Fitting & Accessories)
- Sch 40 dia. 250 : Header
- Sch 40 dia. 250 : Header
- Sch 40 dia. 200 :
- Sch 40 dia. 150 :
- Sch 40 dia. 100 :
- Sch 40 dia. 80 : Exhaust c/w isolasi
- Sch 40 dia. 65 : JFP
- Sch 40 dia. 50 : Drain
- Sch 40 dia. 32 : Tanki Dailly
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- GV dia. 200
- GV dia. 150
- GV dia. 100
- GV dia. 65
- GV dia. 50
- GV dia. 32
- ST dia. 150
- ST dia. 65
- ST dia. 32
- FJ dia. 150
- FJ dia. 65
- FJ dia. 32
- FM dia. 150
- MCV dia. 150 + Alarn Gong
- SRV dia. 100
- Anti vortex tyco
- Pressure Indikator
- Air Vent (AV)

PEMIPAAN HYDRANT & SPRINKLE


HYDRANT
- Sch 40 dia. 200 :
- Sch 40 dia. 150 :
- Sch 40 dia. 100 :
- Sch 40 dia. 80 :
- Sch 40 dia. 150 (Riser)
- Sch 40 dia. 100 (Riser)
- Sch 40 dia. 80 (Riser)
Peralatan Katup-katup
- GV dia. 100
- GV dia. 80
- CV dia. 100
- BCV dia. 100
- LV dia. 80
- OHB 66 x 20 x 95 cm
- IHB 74 x 18 x 25 cm
- Seamese
- Pillar Hydrant

SPRINKLE
- Sch 40 dia. 150
- Sch 40 dia. 100
- Sch 40 dia. 80
- Sch 40 dia. 65
- Sch 40 dia. 50
- Sch 40 dia. 40
- Sch 40 dia. 40 (Riser)
- Sch 40 dia. 32
- Sch 40 dia. 25
- Sch 40 dia. 25 (Drain)
Peralatan Katup-katup
- GV dia. 25
- PRV dia. 40
- TDV dia. 40
- Sprinkle : Pendant
- Fire Extingusher 3 kg
B.1.2 LANTAI 2 S/D 6

PEMIPAAN HYDRANT & SPRINKLE


HYDRANT
- GV dia. 80
- BCV dia. 100
- LV dia. 80
- IHB 74 x 18 x 25 cm

SPRINKLE
- Sch 40 dia. 150
- Sch 40 dia. 100
- Sch 40 dia. 80
- Sch 40 dia. 65
- Sch 40 dia. 50
- Sch 40 dia. 40
- Sch 40 dia. 40 (Riser)
- Sch 40 dia. 32
- Sch 40 dia. 25
- Sch 40 dia. 25 (Drain)
Peralatan Katup-katup
- GV dia. 25
- PRV dia. 40
- TDV dia. 40
- Sprinkle : Pendant
- Fire Extingusher 3 kg

B.2. PEKERJAAN INSTALASI ELEKTRONIK

I PEKERJAAN MATV
a PERALATAN UTAMA MATV

Pengadaan dan pemasangan peralatan MATV


ditempatkan di Ruang Kontrol secara lengkap termasuk peng-
kabelan dan koneksi meliputi peralatan sesuai diuraikan dlm
Gambar dan Spesifikasi Teknis, tetapi tidak terbatas pada item
sebagai berikut :

Inverter 220V/50 Hz
Active Combiner / Mixer
Modulator
Divider
Antenna UHF
Antenna TVRI VHF
Booster Amplifier
TV Monitor Test Point
Head End CATV
Main Booster
Main Splitter
b INSTALASI KABEL FEEDER MATV

Kabel coaxial cable 7C - 2V 750 ohm in conduit Dia.20 dari


Active Combiner/Mixer ke Modulator
Kabel coaxial cable 7C - 2V 750 ohm in conduit Dia.20 dari
Modulator ke Divider
Kabel coaxial cable 7C - 2V 750 ohm in conduit Dia.20 dari
Divider ke Antenna
Kabel coaxial cable 7C - 2V 750 ohm in conduit Dia.20 dari
Active Combiner/Mixer ke Booster Amplifier
Kabel RF out 120 dB in conduit Dia.20 dari
Booster Amplifier ke TV Monitor Test Point
Kabel RF out 120 dB in conduit Dia.20 dari
Booster Amplifier ke TV Main Booster
Kabel coaxial cable 7C - 2V 750 ohm in conduit Dia.20 dari
Head End CATV ke Main Booster
Kabel coaxial cable 7C - 2V 750 ohm in conduit Dia.20 dari
Main Booster ke Main Spliter

c PERALATAN MATV

Pengadaan dan pemasangan peralatan MATV


berikut alat / material bantu lainnya sesuai Gambar
dan Spesifikasi Teknis.

Lantai Dasar
- Splitter 4 Ways
- Tap off 2 Ways
- TV outlet

- Instalasi Splitter 4 Ways


- Instalasi Tap off 2 Ways
- Instalasi TV outlet

Lantai 2 s/d 6
- Splitter 4 Ways
- Tap off 2 Ways
- TV outlet

- Instalasi Splitter 4 Ways


- Instalasi Tap off 2 Ways
- Instalasi TV outlet

Testing & Comissioning

II PEKERJAAN FIRE ALARM


a PERALATAN UTAMA FIRE ALARM

Pengadaan dan pemasangan peralatan Sstem Fire Alarm


ditempatkan di Ruang Kontrol secara lengkap termasuk peng-
kabelan dan koneksi meliputi peralatan sesuai diuraikan dlm
Gambar dan Spesifikasi Teknis, tetapi tidak terbatas pada item
sebagai berikut :

MCP - FA 1 loop max 200 address


Jack intercom
Master interkom
UPS 2 KVA
Announciator

b INSTALASI KABEL FEEDER FIRE ALARM

Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari MCP-FA ke Announciator


Kabel FRC 2 x 2,5 mm ²in conduit Dia.20 dari MCP-FA ke interkom
Kabel Kontrol FRC STP AWG 16 1 Pairs + Kabel Power FRC 3 x 2,5 mm ²
in conduit Dia.20 dari MCP-FA ke JBFA
Kabel FRC 2 x 2,5 mm ²in conduit Dia.20 dari MCP-FA ke UPS 2 KVA

c Kabel dari MCP.FA ke :


1 line telepon ke pemadam kebakaran, Kabel kontrol FRC STP 16 AWG 1 Pairs
dalam pipa conduit Dia. 20mm
Central sound system, FRC 2 x 2.5 mm2 dalam pipa conduit Dia. 20mm
PABx (Autodial), Kabel kontrol FRC STP 16 AWG 1 Pairs dalam pipa conduit Dia. 20mm
Supervisory lift komputer, FRC 2 x 2.5 mm2 dalam pipa conduit Dia. 20mm
Pressurized Fan (Kontrol),FRC 2 x 2.5 mm2 dalam pipa conduit Dia. 20mm
Panel pompa hydrant, FRC 2 x 2.5 mm2 dalam pipa conduit Dia. 20mm
Panel kontrol genset, FRC 2 x 2.5 mm2 dalam pipa conduit Dia. 20mm

d PERALATAN SISTEM FIRE ALARM

Pengadaan dan pemasangan peralatan Sistem Fire Alarm


berikut alat / material bantu lainnya sesuai Gambar
dan Spesifikasi Teknis.

Lantai Dasar
- JBFA
- Photo elektrik smoke detektor
- Rate of rise heat detektor
- Remote lamp
- Manual push button
- Alarm bell
- Flasher lamp
- Jack interkom
- Tamper switch
- Flow switch

- Instalasi Photo elektrik smoke detektor


- Instalasi Rate of rise heat detektor
- Instalasi Remote lamp
- Instalasi Manual push button
- Instalasi Alarm bell
- Instalasi Flasher lamp
- Instalasi Jack interkom
- Instalasi Tamper switch
- Instalasi Flow switch

Lantai 2 s/d 6
- JBFA
- Photo elektrik smoke detektor
- Rate of rise heat detektor
- Remote lamp
- Manual push button
- Alarm bell
- Flasher lamp
- Jack interkom
- Tamper switch
- Flow switch

- Instalasi Photo elektrik smoke detektor


- Instalasi Rate of rise heat detektor
- Instalasi Remote lamp
- Instalasi Manual push button
- Instalasi Alarm bell
- Instalasi Flasher lamp
- Instalasi Jack interkom
- Instalasi Tamper switch
- Instalasi Flow switch

Testing & Comissioning included perijinan dari DEPNAKER

III PEKERJAAN TATA SUARA


a PERALATAN UTAMA TATA SUARA

Pengadaan dan pemasangan peralatan Sstem Tata Suara


ditempatkan di Ruang Kontrol secara lengkap termasuk peng-
kabelan dan koneksi meliputi peralatan sesuai diuraikan dlm
Gambar dan Spesifikasi Teknis, tetapi tidak terbatas pada item
sebagai berikut :

MDF - TS
Selector 20 zone
Power Amplier 240 Watt
UPS 1 KVA
Mixer
MP3 DVD/CD/CDR
Sirine module
Pre Amplifier 120 Watt
Microphone control
Surge Arrester
b INSTALASI KABEL FEEDER TATA SUARA

Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari MDF-TS ke Selector 20 zone
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Selektor 20 zone ke power amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke mixer
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke UPS
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke Pre amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Pre amplifier ke Microphone control
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke Pre amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke MP3 DVD dan Sirene Module

d PERALATAN SISTEM TATA SUARA

Pengadaan dan pemasangan peralatan Sistem Tata Suara


berikut alat / material bantu lainnya sesuai Gambar
dan Spesifikasi Teknis.

Lantai Dasar
- JBTS
- Ceilling speaker 3W
- Wall speaker 3W

- Instalasi Ceilling speaker 3W


- Instalasi Wall speaker 3W

Lantai 2 s/d 6
- JBTS
- Ceilling speaker 3W

Testing & Comissioning

IV PEKERJAAN CCTV
a PERALATAN UTAMA CCTV

Pengadaan dan pemasangan peralatan Sitem CCTV


ditempatkan di Ruang Kontrol secara lengkap termasuk peng-
kabelan dan koneksi meliputi peralatan sesuai diuraikan dlm
Gambar dan Spesifikasi Teknis, tetapi tidak terbatas pada item
sebagai berikut :

DVR 2 x 16 Port
UPS dengan back up battery
LED Monitor 32"

b INSTALASI KABEL FEEDER CCTV

Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari MDF-TS ke Selector 20 zone
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Selektor 20 zone ke power amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke mixer
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke UPS
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke Pre amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Pre amplifier ke Microphone control
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke Pre amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke MP3 DVD dan Sirene Module

d PERALATAN SISTEM CCTV

Pengadaan dan pemasangan peralatan Sistem Tata Suara


berikut alat / material bantu lainnya sesuai Gambar
dan Spesifikasi Teknis.

Lantai Dasar
- Fixed dome camera

- Instalasi Fixed dome camera

Lantai 2 s/d 6
- Fixed dome camera

- Instalasi Fixed dome camera

Testing & Comissioning

V PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)

I PEKERJAAN INSTALASI PLAMBING

I.1 INSTALASI AIR BERSIH


PERALATAN UTAMA
Pengadaan dan pemasangan unit
1 Pompa Transfer
Kapasitas : 50 l/menit
Head : 36 mtr
Speed : 2900 rpm
PI : 0,7 kW / 380V / 3 Ph / 50Hz / 4,5 bar.
1 duty, 1 standby ( bergantian), lengkap dengan
panel control, wlc di Tanki Air Atas dan accessories

2 Booster Pump
Type : Packaged Booster Pump
Kapasitas : 2 x 150 lpm / 3 Bar
Head : 20 mtr
Speed : 1450 rpm
Daya : 1,5 KW
Operasi : 2 Parallel Alternate
( lengkap dengan Pump & Electromotor, Pressure Tank, Panel Kontrol, Pressure switch,
Presure Gauge, Accessories, Gate Valve, Header & base Plat )

3 Tangki Air Atas ( Type Cylinder )


Kapasitas : 5 m3
Glass Rainforcement Plastic (GRP), lengkap dengan Assesories dan dudukan/ pondasi

4 Deep Well
Lokasi : -
Type : Submersible multistage
Kapasitas : 9 m³/jam
Head : -
Tekanan : 10 bar
Daya : 5,3 kW / 380V / 3 Ph / 50Hz.
Putaran : 2.900 Rpm
Motor : Included Pompa
Kedalaman : ± 150 meter
Operasi : Automatic by LS (ON - OFF)
Material pump
- Casing : Cast iron / standard temperature
- Impeller : Stainless Steel
- Shaft : Stainless Steel
Pekerjaan termasuk :
- Panel Control lengkap dengan pengkabelan, NYY 4 x 4 mm2 + BC 4 mm2
- Water Level Control pada GWT
- Pengeboran dengan kedalaman minimal 200 meter
- Casing, pipa-pipa, Valve, meter air, bak kontrol, dll.
- Perijinan
- Kelengkapan lain sesuai dengan spesifikasi teknis & gambar perencanaan.

5 Ground Water Tank


Kapasitas : 210 m3
Rainforced Concrete Made

6 ACCESSORIES POMPA AIR BERSIH


- Gate Valve
dia. 80 ( Untuk Penghubung/penyeimbang GWT)
dia. 50
- Check Valve ( CV )
dia. 50
- Strainer ( STR )
dia. 50
- Flexible Joint ( FJ )
dia. 50
- Foot Valve
dia. 50
- Float Valve
dia. 50
- Pressure Gauge
- GIP med dia. 80 ( pipa header )
- Instalasi pemipaan area pompa
c/w fiting-fitting & support.
- Meteran Air c/w GV dia. 50 & Box Meteran

7 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
a SITE PLAN
1. Dari Box Meter PDAM ke GWT
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT)
2. Pemipaan R.Pompa ke Tanki Air Atas
- GIP dia. 50

b Penyambungan pipa PDAM, pipa gip dia. 65 termasuk


Perijinan.

8 INSTALASI AIR KOTOR & AIR BEKAS


1 Septic Tank ( Biotech )
Kapasitas : 25 m3 /hari

2 Resapan
Kapasitas : 5 m3

- Struktur Pondasi By Sipil

3 TESTING COMMISSIONING

II PENYAMBUNGAN DAYA PLN

Pekerjaan Pasang Baru Daya Listrik PLN 279 KVA


- BP ( Biaya penyambungan )
- UJL ( Uang Jaminan Langanan )
- Biaya Instalatir
- Concuil
- Pemasangan dan material yang dibutuhkan, seperti ;
( kabel, tiang, pondasi, galian & urugan kembali, dll )

PUTM
Pengadaan dan pemasangan PUTM

Transformator 315 KVA


Z = 4%, 20/0,4 KV, 50 Hz, Dyn 5, Type Oil

Vending system ( sistem token termasuk : hardware server, software


operating system, computer, printer, UPS, dll )

KWH Meter Prabayar 1 Ph

Genset
Pengadaan dan pemasangan Genset
(250 KVA, 1500 RPM, 380/220V, 3P + N, 50 Hz, Prime)

Instalasi Genset
- Setting dan levelling unit genset ke atas pondasi
lengkap dengan pemasangan angkur & alat bantu
- Grounding system
Pemipaan knalpot lengkap dengan jacketing rockwool
Tangki harian kap. 200 Ltr
Pemipaan bahan bakar
Residential Silencer
Kabel Trench
Testing Commisioning

III PEKERJAAN INSTALASI KABEL FEEDER


Kabel Distribusi Daya dari Panel Pompa - Air Bersih
- NYY 4 x 4 mm2 ke LP-1
- NYY 4 x 4 mm2 ke LP-2

- Proteksi Kabel dengan Pipa Gip Dia 100


Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya

- Testing & Commissioning

IV PEKERJAAN INSTALASI HYDRANT


PERALATAN UTAMA

Pompa Pemadam Kebakaran Elektrik (Electric Pump)


Type : Horizontal Split Casing
Kapasitas : 750 USGPM / 10 Bar
Head : 105 m
Power : 128 KW
Putaran : 2900
Standart : NFPA 20
Controller : NFPA 20
Operasi : Automatic on - manual off
Efisiensi : Minimal 65%
Material
- Casing : Cast Iron
- Seal : Gland
- Shaft : Heavy duty steel
Accessories :
c/w Electric Fire Hydrant Controller Comply NFPA 20,
Free Standing Lockable door with isolating disconnect
switch, star Delta Starting Operation, Loss Of Phase,
And Connected to B.A.S, Sreen Filter ( Vortex type ), Panel Kontrol

Pompa Pemadam Kebakaran Diesel (Diesel Pump)


Type : Horizontal Split Casing
Kapasitas : 750 USGPM / 10 Bar
Head : 105 m
Power : 172 HP
Putaran : 2900
Standart : NFPA20
Operasi : Automatic on - Manual off
Efisiensi : Minimal 65%
material
- Casing : Cast Iron
- Seal : Gland
- Shaft : High Tensile Carbon Steel
c/w heat exchanger cooling system, Lead Acid batteries
with rack & cable, Standard Muffler, Fuel Oil tank 500
litre, Fuel System & Accesories, Battery cahrger, over speed shutdown
protection, double solenoid starter, Panel Control. screen filter ( Vortex Type )

Pompa Pemacu Pemadam Kebakaran (Jockey Pump)


Type : Vertical in line
Kapasitas : 15 USGPM / 11 bar
Head : 115 m
Power : 2,2 KW
Putaran : 2900
Standart : NFPA 20
Operasi : Automatic on - off
Accessories
c/w Jockey Fire Pump Controller, Wall Mounted Type,
Direct On Line Starting Operating, Screen filter ( Vortex type )

Dari SDP-Hydrant ke :
Pekerjaan termasuk clamb, support, cable ladder, hanger
dan perlengkapan lainnya.
Panel Control Electric Fire Pump (PC-EFP):
Kabel : FRC 4 x 185 mm2 + BC 70 mm2
Panel Control Jockey Fire Pump (PC-JFP):
Kabel : FRC 4 x 4 mm2 + BC 4 mm2

Dari Panel Control ke


Electric Fire Pump (EFP) :
Kabel : FRC 4 x 185 mm2 + BC 70 mm2
Jockey Fire Pump (JFP):
Kabel : FRC 4 x 4 mm2 + BC 4 mm2

Sistem Pemadam Tangga Kebakaran


Pressurized Fan
Type : Centrifugal
Kapasitas : 21.000 Cfm / 2,03 Inch Wg
Daya : + 10 Kw
Operasi : Automatic ON-OFF

Pressurized Fan
Type : Centrifugal
Kapasitas : 480 Cfm
Daya : + .........
Operasi : Automatic ON-OFF
Pressurized Fan
Type : Centrifugal
Kapasitas : 690 Cfm
Daya : + .......
Operasi : Automatic ON-OFF

Ducting tanpa isolasi BJLS 100


1000 x 300
700 x 300
SAG 800 x 300
EAG 800 x 300
Instalasi daya listrik

V PEKERJAAN GONDOLA

I PERLENGKAPAN KERETA GONDOLA


1 PLATFORM / KERETA
Rangka : HS 40 x 40 x 2 (Hotdip Galvanis)
Lantai sangkar : Aluminium non slip surface 3 mm thick as landing
working platform roda karet dia.4"
Size : 2400 x 600 x 1379 mm
Weight : 100 kg
Lengkap dengan top limit speed, overspeed safety device with manual reset hour meter,
emergency stop button, hold on run push button, power on indicator light, no power
emergency descent level, electro magnetic brake, inspection window, galvanish wiremesh,
roller bumper, rubber whell dia.4", dan peralatan serta aksesories lainya sesuai gambar
dan spesifikasi teknis

2 HOIST TAKAHASHI YJ - 99
Position : on platform
Quantity : 2 unit untuk setiap sangkar
SWL : 630 kg/unit
Lifting speed : 8 - 10 m/min
Power consumption : 3PH/380V/50Hz/1 HP
Self weight : 45 kg/unit
Safety : Slack rope safety device
Power failure Breake release

3 WIRE WINDER
Material : Galvanized steel plat 1,5 mm
Motor penggerak : 0,5 HP

4 PANEL CONTROL
Type : Type wheather proof (IP 65)
Tebal plat : 2mm, Busbar Cu tin plating
Finishing Box : Powder coating anti karat
Lengkap dengan MCCB, MCB, busbar, metering, relay, dan aksesories lainya sesuai gambar
dan spesifikasi teknis

5 WIRE ROPE
Diameter : 8,2 mm (disesuaikan denga tinggi bangunan)
Main rope leght : 6 x 19 IWRC ) 2 x 30 m
Safety rope leght : 6 x 19 IWRC ) 2 x 30 m
Type of wire rope : IWRC Galvanized
B. Strenght : 4300 kg

6 KABEL ELECTRIC
Structure : 5 x 2,5 mm2 (1 x 75 m)
Type : NYYHY / Flexicore

7 SAFETY BODY HARNESS


Nylon rope : dia. 16 mm (2 x 50 m)
Body harness : Karam saftec
Connector : Karam saftec
Helm : 2 pcs
H.T (Alat komunikasi) : 2 unit

II ANCHORANGE SYSTEM (SISTEM PENGGANTUNG)


8 DAVID SOCKET SYSTEM
Konstruksi david socket arm (galvanized)
Plate sitting david socket arm (galvanized)
Angkore plate sitting (angkore, bolt & nut, pengelasan)
Plate tie back (Galvanized)
Angkote plate tie back (angkore, bolt & nut, pengelasan)

III LAIN - LAIN


9 Test commisioning dan training
Akomoadasi dan transportasi

VI PEKERJAAN LIFT

Pasangger Lift
Data Lift :
Lift Designation/s : LP-01
Lift Type : Passengger elevator
Machine Room Location : Machine Room
Load : 1000 kg
Max. No. of Passengers : 15 person
Speed : 1,5 m/s
Travel : 14,4 m
Overtravel : 4800 mm
Pit Depth : 1800 mm
Shaft Size (W x D) : 1800 x 1930 mm
Machine Room Height :
Number of Floors :6
Car Entrances :1
Number of Stops / Entrances : 6 / 6F
Floor Designations/s
Front : GF, 1,2,3,5,6
Rear :-
Side :-
Emergency Exit :-

Drive Data :
Drive System : ACVVVF Gearless
Main Power Supply / Frequenc: 380 V/ 50 Hz
Lighting Power Supply / Frequ : 220 V/ 50 Hz
Power Requirement : TBA KW

Electrical Data :
Control Mode : Collective Selective
Group Size :2
Layout Type : Inline
COP Button Type : Linea 100
COP Number / Location : 2 / Front
COP Indicator Type : Linea 100
COP Faceplate : HLSS
No. of Risers
Main Floor :1
Other Floor :1
LOP Button Type : Linea 100
LOP Faceplate
Main Floor : HLSS
Other Floor : HLSS
LIP (Indicator) Type
Main Floor : Linea 100 (Above Door)
Other Floor : Linea 100 (Combined w/ LOP)
LIP (Indicator) Faceplate
Main Floor : HLSS
Other Floor : HLSS

Landing Door :
Door Type : 2-Panel Center Opening
Landing Door Size (W x H) : 800 x 2100
Door Panel Finish
Main Floor : HLSS
Other Floor : HLSS
Frame Type
Main Floor : Box Frame 50x50
Other Floor : Box Frame 50x50
Door Frame Finish
Main Floor : HLSS
Other Floor : HLSS
Door Sill : Aluminum

Car :
Car Door Type : 2-Panel Center Opening
Car Size (W x D x H) : 1350 x 1400 x 2500mm
Car Clear Height : 2400 mm
Car Door Size (W x H) : 800 x 2100 mm
Car Door Safety : Light Curtain
Car Door Finish : HLSS
Car Door Sill : Aluminum
Car Decoration Line : Times Square 2.0
Front Wall Type : Expression
Front Wall Deco. : HLSS
Side Wall Deco. : HLSS
Rear Wall Deco. : HLSS
Mirror : Not Provided
Handrail : Not Provided
Floor Deco. & Recess : Granite
Ceiling Deco. : Squares
Max. Add. Deco. Weight :-

Counterweight :
C/W Location in Shaft : Side
C/W Safety Gear : Not Provided
Accessible Space Below Pit : No

Other Requirements :
Air Conditioner in Car : Not Provided
Attendant Control : Standard
Automatic Rescue Device (ARD: Provided
Car Call Cancelling : Provided
Card Reader Interface : Provided
CCTV Interface : Provided
Earthquake Control Interface : Provided
Emergency Backup for Light & : Provided
Emergency Exit (Blind Zone) : Not provided
Emergency Power Control : Standard
Fireman Control : BR1 (Fire Homing)
Hall Lantern on Landing : Not Provided
Independent Control w/ Parkin : Provided
Intercom : 3-way (Car-MR-Control)
Multimedia LCD Display : Not Provided
Out of Service Control : Standard
PORT System : Not Provided
Pre-Arrival Gong : On Car
Supervisory Panel : CRT Monitoring
Voice Synthesizer : Not Provided
Other Special Requirements / C: -

Service/Fireman's Lift
Data Lift :
Lift Designation/s : LS/F-01
Lift Type : Service/Fireman's Lift
Machine Room Location : Machine Room
Load : 1000 kg
Max. No. of Passengers : 15 person
Speed : 1 m/s
Travel : 21,2 m
Overtravel : 4600 mm
Pit Depth : 1500 mm
Shaft Size (W x D) : 2300 x 2850 mm
Machine Room Height :
Number of Floors :8
Car Entrances :1
Number of Stops / Entrances : 8 / 8F
Floor Designations/s
Front : GF, 1,2,3,5,6,7,8
Rear :-
Side :-
Emergency Exit :-

Drive Data :
Drive System : ACVVVF PM Gearless
Main Power Supply / Frequenc: 380 V/ 50 Hz
Lighting Power Supply / Frequ : 220 V/ 50 Hz
Power Requirement : TBA KW

Electrical Data :
Control Mode : Collective Selective
Group Size :2
Layout Type : Inline
COP Button Type : Linea 100
COP Number / Location : 2 / Side
COP Indicator Type : Linea 100
COP Faceplate : HLSS
No. of Risers
Main Floor :1
Other Floor :1
LOP Button Type : Linea 100
LOP Faceplate
Main Floor : HLSS
Other Floor : HLSS
LIP (Indicator) Type
Main Floor : Linea 100 (Above Door)
Other Floor : Linea 100 (Combined w/ LOP)
LIP (Indicator) Faceplate
Main Floor : HLSS
Other Floor : HLSS

Landing Door :
Door Type : 2-Panel Side Opening
Landing Door Size (W x H) : 1200 x 2100
Door Panel Finish
Main Floor : HLSS
Other Floor : HLSS
Frame Type
Main Floor : Box Frame 50x50
Other Floor : Box Frame 50x50
Door Frame Finish
Main Floor : HLSS
Other Floor : HLSS
Door Sill : Aluminum

Car :
Car Door Type : 2-Panel Side Opening
Car Size (W x D x H) : 1500 x 2300 x 2500mm
Car Clear Height : 2400 mm
Car Door Size (W x H) : 1200 x 2400 mm
Car Door Safety : Light Curtain
Car Door Finish : HLSS
Car Door Sill : Aluminum
Car Decoration Line : Times Square 2.0
Front Wall Type : Expression
Front Wall Deco. : HLSS
Side Wall Deco. : HLSS
Rear Wall Deco. : HLSS
Mirror : Not Provided
Handrail : Not Provided
Floor Deco. & Recess : Rubber
Ceiling Deco. : Square Spot
Max. Add. Deco. Weight :-

Counterweight :
C/W Location in Shaft : Side
C/W Safety Gear : Not Provided
Accessible Space Below Pit : No

Other Requirements :
Air Conditioner in Car : Not Provided
Attendant Control : Standard
Automatic Rescue Device (ARD: Provided
Car Call Cancelling : Provided
Card Reader Interface : Provided
CCTV Interface : Provided
Earthquake Control Interface : Provided
Emergency Backup for Light & : Provided
Emergency Exit (Blind Zone) : Not provided
Emergency Power Control : Standard
Fireman Control : BR2 (Fire Homing)
Hall Lantern on Landing : Not Provided
Independent Control w/ Parkin : Provided
Intercom : 3-way (Car-MR-Control)
Multimedia LCD Display : Not Provided
Out of Service Control : Standard
PORT System : Not Provided
Pre-Arrival Gong : On Car
Supervisory Panel : CRT Monitoring
Voice Synthesizer : Not Provided
Other Special Requirements / C: -

Pemasangan Lift Passenger


Pemasangan Lift Service
Transportasi
Akomodasi
Pengadaan dan pemasangan CCTV
Pengadaan dan pemasangan Automatic Rescue Device (ARD)
Supervisory Panel c/w 2 buah intercom
Panel kontrol Lift (LP - 01) termasuk kabel power / control ke
Pasanger Lift LP-01 dan kabel power dari panel power ke panel kontrol.
Panel kontrol Lift (LS - 01) termasuk kabel power / control ke
Service Lift LS-01 dan kabel power dari panel power ke panel kontrol.
Sistem acces control yang teritegrasi dengan acces card building
Kelengkapan bantu sistem & Ijin Depnaker
Testing dan komisioning termasuk biaya bahan bakar saat test

VII PEKERJAAN AC & VENTILASI UDARA

AC
1 LANTAI DASAR

AC Wall mounted (3/4 PK) (untk Hunian)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

AC Wall mounted (1/2 PK) (untk Hunian)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

AC Wall mounted (3/4 PK) (R. Pengelola, Musholla, R. Serbaguna)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

2 LANTAI 2

AC Wall mounted (3/4 PK)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning
AC Wall mounted (1/2 PK) (untk Hunian)
- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

3 LANTAI 3

AC Wall mounted (3/4 PK)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

AC Wall mounted (1/2 PK) (untk Hunian)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

4 LANTAI 4

AC Wall mounted (3/4 PK)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

AC Wall mounted (1/2 PK) (untk Hunian)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

5 LANTAI 5

AC Wall mounted (3/4 PK)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

AC Wall mounted (1/2 PK) (untk Hunian)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

6 LANTAI 6
AC Wall mounted (3/4 PK)
- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

AC Wall mounted (1/2 PK) (untk Hunian)


- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning

VENTILASI UDARA

LANTAI DASAR
1 - Exhaust Fan (EF-01 s/d 8/LT.D Toilet
(Termasuk Pipa Pvc D + Grille + Support, dll)
Capacity : 50 Cfm
Type : Ceiling Fan

2 - Exhaust Fan (Toilet Umum LT.DasaToilet


(Termasuk Pipa Pvc D + Grille + Support, dll)
Capacity : 50 Cfm
Type : Ceiling Fan

LANTAI 2 S/D 6
3 - Exhaust Fan (EF-01 s/d 12/LT.2 s/dToilet
(Termasuk Pipa Pvc D + Grille + Support, dll)
Capacity : 50 Cfm
Type : Ceiling Fan

VIII PEKERJAAN ACCES CONTROL / CARD

A. Pengadaan dan Pemasangan Access Control Lift


1 Lift Controller
3 Expantion lift controller
4 Wiegand Reader With Proximity
5 PSU Set
6 Lisence-Soft-WEB- Each Lift
7 PC Server
8 Proximity Card

B. Instalasi Kabel dan Conduit


1 Kabel UTP CAT 6
2 Pipa Conduit 20mm
3 Kabel AWG 18
4 Switch Hub 8 port
5 Pipa Conduit 20mm
6 Kabel Power NYM 2x2.5mm
C. Transportasi Akomodasi Keamanan dan Keselamatan Kerja
D. Pekerjaan perapihan
E. Material & alat bantu
F. Testing & Comissioning instalasi
KAPITULASI
QUANTITY ( BOQ )
EKANIKAL & ELEKTRIKAL

SUSUN BWS KALIMANTAN

MAHAN PROVINSI KALIMANTAN BARAT

L DAN ELEKTRIKAL
KAL DAN ELEKTRIKAL NON STANDART

HARGA SATUAN
URAIAN PEKERJAAN SAT VOL
(Rp)

& ELEKTRIKAL NON STANDART

BAKARAN

m 3.171 -
m 2.254 -
m 9.716 -
m 10.251 -
m 2.384 -
Exhaust c/w isolasi m 3.357 -
m 1.587 -
m 1.746 -
Tanki Dailly m 4.32 -

bh 2.00 -
bh 4.00 -
bh 4.00 -
bh 1.00 -
bh 1.00 -
bh 2.00 -
bh 2.00 -
bh 1.00 -
bh 2.00 -
bh 2.00 -
bh 1.00 -
bh 2.00 -
bh 1.00 -
bh 1.00 -
bh 1.00 -
bh 2.00 -
bh 6.00 -
bh 1.00 -

m 17.00 -
m 23.94 -
m 120.72 -
m 3.99 -
m 4.00 -
m 16.00 -
m 4.00 -

bh 5.00 -
bh 2.00 -
bh 1.00 -
bh 1.00 -
bh 2.00 -
bh 4.00 -
bh 2.00 -
bh 1.00 -
bh 4.00 -

m 18.78 -
m 6.77 -
m 19.84 -
m 13.98 -
m 8.35 -
m 39.25 -
m 8.00 -
m 24.66 -
m 107.23 -
m 7.27 -

bh 2.00 -
bh 1.00 -
bh 2.00 -
bh 75.00 -
bh 4.00 -
bh 10.00 -
bh 5.00 -
bh 10.00 -
bh 10.00 -

m 93.88 -
m 33.87 -
m 99.19 -
m 69.92 -
m 41.77 -
m 196.27 -
m 40.00 -
m 123.30 -
m 536.16 -
m 36.35 -

bh 10.00 -
bh 5.00 -
bh 10.00 -
bh 375.00 -
bh 20.00 -

EKTRONIK

peralatan MATV
secara lengkap termasuk peng-
peralatan sesuai diuraikan dlm
s, tetapi tidak terbatas pada item

unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 2.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
50 ohm in conduit Dia.20 dari m 15.00 -

50 ohm in conduit Dia.20 dari m 10.00 -

50 ohm in conduit Dia.20 dari m 10.00 -

50 ohm in conduit Dia.20 dari m 15.00 -


oster Amplifier
uit Dia.20 dari m 15.00 -
or Test Point
uit Dia.20 dari m 10.00 -

50 ohm in conduit Dia.20 dari m 15.00 -

50 ohm in conduit Dia.20 dari m 10.00 -

peralatan MATV
nnya sesuai Gambar

bh 2.00 -
bh 1.00 -
bh 12.00 -

titik 2.00 -
titik 1.00 -
titik 12.00 -

bh 10.00 -
bh 5.00 -
bh 60.00 -
-
titik 10.00 -
titik 5.00 -
titik 60.00 -

lot 1.00 -

peralatan Sstem Fire Alarm


secara lengkap termasuk peng-
peralatan sesuai diuraikan dlm
s, tetapi tidak terbatas pada item

unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -

FIRE ALARM

nduit Dia.20 dari MCP-FA ke Announciator m 15.00 -


nduit Dia.20 dari MCP-FA ke interkom m 15.00 -
16 1 Pairs + Kabel Power FRC 3 x 2,5 mm ² m 25.00 -

nduit Dia.20 dari MCP-FA ke UPS 2 KVA m 15.00 -

bakaran, Kabel kontrol FRC STP 16 AWG 1 Pairs m 35.00 -

x 2.5 mm2 dalam pipa conduit Dia. 20mm m 35.00 -


ol FRC STP 16 AWG 1 Pairs dalam pipa conduit Dia. 20mm m 35.00 -
C 2 x 2.5 mm2 dalam pipa conduit Dia. 20mm m 35.00 -
C 2 x 2.5 mm2 dalam pipa conduit Dia. 20mm m 35.00 -
x 2.5 mm2 dalam pipa conduit Dia. 20mm m 35.00 -
2.5 mm2 dalam pipa conduit Dia. 20mm m 35.00 -

peralatan Sistem Fire Alarm


nnya sesuai Gambar

bh 1.00 -
bh 52.00 -
bh 10.00 -
bh 11.00 -
bh 2.00 -
bh 2.00 -
bh 2.00 -
bh 2.00 -
bh 1.00 -
bh 1.00 -

titik 52.00 -
titik 10.00 -
titik 11.00 -
titik 2.00 -
titik 2.00 -
titik 2.00 -
titik 2.00 -
titik 1.00 -
titik 1.00 -

bh 5.00 -
bh 265.00 -
bh 50.00 -
bh 60.00 -
bh 10.00 -
bh 10.00 -
bh 10.00 -
bh 10.00 -
bh 5.00 -
bh 5.00 -

titik 265.00 -
titik 50.00 -
titik 60.00 -
titik 10.00 -
titik 10.00 -
titik 10.00 -
titik 10.00 -
titik 5.00 -
titik 5.00 -

ed perijinan dari DEPNAKER lot 1.00 -

peralatan Sstem Tata Suara


secara lengkap termasuk peng-
peralatan sesuai diuraikan dlm
s, tetapi tidak terbatas pada item

unit 1.00 -
unit 1.00 -
unit 5.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 3.00 -
unit 2.00 -
unit 1.00 -
TATA SUARA

nduit Dia.20 dari MDF-TS ke Selector 20 zone m 15.00 -


nduit Dia.20 dari Selektor 20 zone ke power amplifier m 15.00 -
nduit Dia.20 dari Power amplifier ke mixer m 15.00 -
nduit Dia.20 dari Power amplifier ke UPS m 15.00 -
nduit Dia.20 dari Power amplifier ke Pre amplifier m 15.00 -
nduit Dia.20 dari Pre amplifier ke Microphone control m 15.00 -
nduit Dia.20 dari Mixer ke Pre amplifier m 15.00 -
nduit Dia.20 dari Mixer ke MP3 DVD dan Sirene Module m 15.00 -

peralatan Sistem Tata Suara


nnya sesuai Gambar

bh 1.00 -
bh 6.00 -
bh 4.00 -

bh 6.00 -
bh 4.00 -

bh 5.00 -
bh 30.00 -

lot 1.00 -

peralatan Sitem CCTV


secara lengkap termasuk peng-
peralatan sesuai diuraikan dlm
s, tetapi tidak terbatas pada item

unit 1.00 -
unit 1.00 -
unit 2.00 -

nduit Dia.20 dari MDF-TS ke Selector 20 zone m 15.00 -


nduit Dia.20 dari Selektor 20 zone ke power amplifier m 15.00 -
nduit Dia.20 dari Power amplifier ke mixer m 15.00 -
nduit Dia.20 dari Power amplifier ke UPS m 15.00 -
nduit Dia.20 dari Power amplifier ke Pre amplifier m 15.00 -
nduit Dia.20 dari Pre amplifier ke Microphone control m 15.00 -
nduit Dia.20 dari Mixer ke Pre amplifier m 15.00 -
nduit Dia.20 dari Mixer ke MP3 DVD dan Sirene Module m 15.00 -

peralatan Sistem Tata Suara


nnya sesuai Gambar

bh 4.00 -

bh 4.00 -

bh 20.00 -

bh 20.00 -

lot 1.00 -

PRASARANA LINGKUNGAN (LUAR BANGUNAN)

bh 2.00 -

0,7 kW / 380V / 3 Ph / 50Hz / 4,5 bar.


), lengkap dengan set 1.00 Include
Atas dan accessories

set 1.00 -
Packaged Booster Pump
2 x 150 lpm / 3 Bar

2 Parallel Alternate
ctromotor, Pressure Tank, Panel Kontrol, Pressure switch,
, Gate Valve, Header & base Plat )

unit 2.00 -
GRP), lengkap dengan Assesories dan dudukan/ pondasi

set 1.00 -

Submersible multistage

5,3 kW / 380V / 3 Ph / 50Hz.


2.900 Rpm
Included Pompa
± 150 meter
Automatic by LS (ON - OFF)

Cast iron / standard temperature


Stainless Steel
Stainless Steel

an pengkabelan, NYY 4 x 4 mm2 + BC 4 mm2

man minimal 200 meter


eter air, bak kontrol, dll.

ngan spesifikasi teknis & gambar perencanaan.

unit 1.00 By Sipil

enyeimbang GWT) bh 1.00 -


bh 4.00 -

bh 2.00 -

bh 2.00 -

bh 4.00 -

bh 2.00 -

bh 2.00 -
bh 1.00 -
set 1.00 -
lot 1.00 -

Box Meteran unit 1.00 -


itting & All Accessories)

ter PDAM ke GWT) m 20.00 -

m 84.00 -

pipa gip dia. 65 termasuk lot 1.00 tidak ditawarkan

unit 1.00 -
25 m3 /hari

unit 2.00 -

lot 1.00 -

Listrik PLN 279 KVA VA 279,000 -

ng dibutuhkan, seperti ;
& urugan kembali, dll )

unit 1.00 -

unit 1.00 -
n 5, Type Oil

n termasuk : hardware server, software lot 1.00 -


printer, UPS, dll )

bh 68.00 -

unit 1.00 -

0V, 3P + N, 50 Hz, Prime)

lot 1.00 -
et ke atas pondasi
angkur & alat bantu
ngan jacketing rockwool

BEL FEEDER
anel Pompa - Air Bersih
m' 10.00 -
m' 10.00 -

Gip Dia 100 m' 20.00 -


termasuk galian dan material bantu lainya

lot 1.00 -

ktrik (Electric Pump) unit 1.00 -


Horizontal Split Casing
750 USGPM / 10 Bar

Automatic on - manual off


Minimal 65%

Heavy duty steel

roller Comply NFPA 20,


with isolating disconnect
eration, Loss Of Phase,
n Filter ( Vortex type ), Panel Kontrol

Diesel (Diesel Pump) unit 1.00 -


Horizontal Split Casing
750 USGPM / 10 Bar

Automatic on - Manual off


Minimal 65%
High Tensile Carbon Steel
stem, Lead Acid batteries
uffler, Fuel Oil tank 500
s, Battery cahrger, over speed shutdown
arter, Panel Control. screen filter ( Vortex Type )

bakaran (Jockey Pump) unit 1.00 -


Vertical in line
15 USGPM / 11 bar

Automatic on - off

er, Wall Mounted Type,


ing, Screen filter ( Vortex type )

pport, cable ladder, hanger

mp (PC-EFP):
FRC 4 x 185 mm2 + BC 70 mm2 m 10.75 -

FRC 4 x 4 mm2 + BC 4 mm2 m 10.57 -

FRC 4 x 185 mm2 + BC 70 mm2 m 6.98 -

FRC 4 x 4 mm2 + BC 4 mm2 m 7.97 -

unit 2.00 -
Centrifugal
21.000 Cfm / 2,03 Inch Wg

Automatic ON-OFF

unit 1.00 -
Centrifugal

Automatic ON-OFF
unit 1.00 -
Centrifugal

Automatic ON-OFF

m 64.00 -
m 60.00 -
bh 12.00 -
bh 12.00 -
ttk 4.00 -

unit 1.00 -
HS 40 x 40 x 2 (Hotdip Galvanis)
Aluminium non slip surface 3 mm thick as landing
working platform roda karet dia.4"
2400 x 600 x 1379 mm

ed, overspeed safety device with manual reset hour meter,


on run push button, power on indicator light, no power
tro magnetic brake, inspection window, galvanish wiremesh,
a.4", dan peralatan serta aksesories lainya sesuai gambar

unit 2.00 -
on platform
2 unit untuk setiap sangkar
630 kg/unit
8 - 10 m/min
3PH/380V/50Hz/1 HP

Slack rope safety device


Breake release

unit 2.00 -
Galvanized steel plat 1,5 mm

unit 1.00 -
Type wheather proof (IP 65)
2mm, Busbar Cu tin plating
Powder coating anti karat
busbar, metering, relay, dan aksesories lainya sesuai gambar

set 1.00 -
8,2 mm (disesuaikan denga tinggi bangunan)
6 x 19 IWRC ) 2 x 30 m
6 x 19 IWRC ) 2 x 30 m
IWRC Galvanized

set 1.00 -
5 x 2,5 mm2 (1 x 75 m)
NYYHY / Flexicore

set 2.00 -
dia. 16 mm (2 x 50 m)
Karam saftec
Karam saftec

ISTEM PENGGANTUNG)

set 1.00 -
(galvanized) pcs 73.00 -
, bolt & nut, pengelasan) titik 292.00 -
pcs 73.00 -
re, bolt & nut, pengelasan) set 146.00 -

lot 1.00 -
lot 1.00 -

Unit 1.00 -

: Passengger elevator
: Machine Room

: 15 person

: 4800 mm
: 1800 mm
: 1800 x 1930 mm

: GF, 1,2,3,5,6
: ACVVVF Gearless
: 380 V/ 50 Hz
: 220 V/ 50 Hz

: Collective Selective

: Linea 100

: Linea 100

: Linea 100

: Linea 100 (Above Door)


: Linea 100 (Combined w/ LOP)

: 2-Panel Center Opening


: 800 x 2100

: Box Frame 50x50


: Box Frame 50x50

: Aluminum

: 2-Panel Center Opening


: 1350 x 1400 x 2500mm
: 2400 mm
: 800 x 2100 mm
: Light Curtain

: Aluminum
: Times Square 2.0
: Expression

: Not Provided
: Not Provided

: Not Provided

: Not Provided
: Standard

: Not provided
: Standard
: BR1 (Fire Homing)
: Not Provided

: 3-way (Car-MR-Control)
: Not Provided
: Standard
: Not Provided

: CRT Monitoring
: Not Provided

Unit 1.00 -

: Service/Fireman's Lift
: Machine Room

: 15 person
: 4600 mm
: 1500 mm
: 2300 x 2850 mm

: GF, 1,2,3,5,6,7,8

: ACVVVF PM Gearless
: 380 V/ 50 Hz
: 220 V/ 50 Hz

: Collective Selective

: Linea 100

: Linea 100

: Linea 100

: Linea 100 (Above Door)


: Linea 100 (Combined w/ LOP)

: 2-Panel Side Opening


: 1200 x 2100

: Box Frame 50x50


: Box Frame 50x50

: Aluminum

: 2-Panel Side Opening


: 1500 x 2300 x 2500mm
: 2400 mm
: 1200 x 2400 mm
: Light Curtain

: Aluminum
: Times Square 2.0
: Expression

: Not Provided
: Not Provided

: Square Spot

: Not Provided

: Not Provided
: Standard

: Not provided
: Standard
: BR2 (Fire Homing)
: Not Provided

: 3-way (Car-MR-Control)
: Not Provided
: Standard
: Not Provided

: CRT Monitoring
: Not Provided

Unit 1.00 -
Unit 1.00 -
Unit 2.00 Include
Unit 2.00 Include
Unit 2.00 Include
Automatic Rescue Device (ARD) Unit 2.00 Include
Set 1.00 Include
masuk kabel power / control ke Set 2.00 Include
l power dari panel power ke panel kontrol.
masuk kabel power / control ke Set 1.00 Include
ower dari panel power ke panel kontrol.
tegrasi dengan acces card building lot 1.00 Include
jin Depnaker lot 1.00 Include
asuk biaya bahan bakar saat test lot 1.00 Include

unit 8.00 -
1/4" dan 3/8" m 96.00 -
m 80.00 -
duit 20 mm m 120.00 -
lot 1.00 -

unit 16.00 -
1/4" dan 3/8" m 192.00 -
m 160.00 -
duit 20 mm m 240.00 -
lot 1.00 -

Pengelola, Musholla, R. Serbaguna) unit 4.00 -


1/4" dan 3/8" m 48.00 -
m 40.00 -
duit 20 mm m 60.00 -
lot 1.00 -

unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -
unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -

unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -

unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -

unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -

unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -

unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -

unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -
unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -

unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -

unit 8.00 -
+ Support, dll)

unit 7.00 -
+ Support, dll)

unit 60.00 -

+ Support, dll)

ROL / CARD

n Access Control Lift


Buah 1.00 -
Buah 1.00 -
Buah 1.00 -
Buah 1.00 -
Buah 1.00 -
Buah 1.00 -
Buah 10.00 -

M' 150.00 -
M' 50.00 -
M' 0.00 -
M' 1.00 -
M' 0.00 -
M' 50.00 -
manan dan Keselamatan Kerja lot 1.00 -
lot 1.00 -
lot 1.00 -
lot 1.00 -
TOTAL HARGA
(Rp)

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-

-
-
-

-
-
-
-

-
-
-

-
-
-
-
-
-

-
-
-

-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-

-
-

-
-

-
-
-

-
-
-
-
-
-
-
-

-
-

By Sipil

-
-

-
-
-
-

-
-

-
-

-
-

-
-

-
-

-
-
-
-
-

-
-

-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-
-

-
-
-

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
DAFTAR UPAH PEKERJA

NO. URAIAN TENAGA SATUAN UPAH


1 2 3 4

1 PEKERJA Org / hr
2 TUKANG GALI Org / hr
3 KEPALA TUKANG BATU Org / hr
4 TUKANG BATU Org / hr
5 KEPALA TUKANG KAYU Org / hr
6 TUKANG KAYU Org / hr
7 KEPALA TUKANG BESI Org / hr
8 TUKANG BESI Org / hr
9 KEPALA TUKANG CAT Org / hr
10 TUKANG CAT Org / hr
11 TUKANG ASPAL Org / hr
12 MANDOR / PENGAWAS Org / hr
13 KEPALA INSTALATOR Org / hr
14 INSTALATOR Org / hr
15 PEMBANTU INSTALATOR Org / hr
16 TUKANG BABAT RUMPUT Org / hr
17 TUKANG TAMAN Org / hr
18 KEPALA TUKANG PASANG PIPA / LEDENG Org / hr
19 TUKANG PASANG PIPA / LEDENG Org / hr
20 OPERATOR ALAT BESAR Org / hr
21 PEMBANTU OPERATOR ALAT BESAR Org / hr
22 TUKANG LAS Org / hr
ANALISA MEKANIKAL

Memasang 1 m' pipa PPR PN-10 ø 1/2"


Bahan An. SNI ( Revisi ) 6.1.1
1.000 m' Pipa PPR PN-10 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.1.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PPR PN-10 ø 3/4"


Bahan An. SNI ( Revisi ) 6.2.1
1.000 m' Pipa PPR PN-10 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.2.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PPR PN-10 ø 1"


Bahan An. SNI ( Revisi ) 6.3.1
1.000 m' Pipa PPR PN-10 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.3.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PPR PN-10 ø 1,5"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PPR PN-10 ø 2"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 bh Gate valve 10K 3/4" (20 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 3/4" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 10K 1" (25 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 1" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 10K 1,25" (32 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 1,25" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 10K 1,5" (40 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 1,5" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 10K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 2" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 10K 2,5" (65 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 2,5" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 10K 3" (80 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 3" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.015 Oh Kepala tukang @ Rp. 0.00 = Rp
0.010 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 10K 4" (100 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 4" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.015 Oh Kepala tukang @ Rp. 0.00 = Rp
0.010 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 10K 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 6" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 0.00 = Rp
0.250 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 16K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 2" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 16K 4" (100 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 4" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.015 Oh Kepala tukang @ Rp. 0.00 = Rp
0.010 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Gate valve 16K 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Gate valve 6" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 0.00 = Rp
0.250 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Butterfly valve 10K "toyo" 4" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Butterfly valve 6" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.015 Oh Kepala tukang @ Rp. 0.00 = Rp
0.010 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 bh Check valve 10K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh check valve 2" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Check valve 16K 4" (100 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh check valve 4" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.015 Oh Kepala tukang @ Rp. 0.00 = Rp
0.010 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Check valve 16K 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh check valve 6" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 0.00 = Rp
0.250 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh strainer 10K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh strainer 2" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh strainer 16K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh strainer 2" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh strainer 16K 4" (100 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh strainer 4" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 0.00 = Rp
0.250 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp

Memasang 1 bh flexible joint 10K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh flexible joint 2" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh flexible joint 10K 4" (100 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh flexible joint 4" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 0.00 = Rp
0.250 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh foot valve 10K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh foot valve 2" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh foot valve 10K 4" (100 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh foot valve 4" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 0.00 = Rp
0.250 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Meter Air c/w BV dia 20 mm


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Meter Air 20 mm @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Meter Air c/w BV dia 50 mm


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Meter Air 50 mm @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa PPR PN-20 ø 1/2"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-20 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 bh Water Heater


Bahan An. SNI ( Revisi ) 6.31.1
1 bh water heater @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 1/2"


Bahan An. SNI ( Revisi ) 6.1.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.1.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 3/4"


Bahan An. SNI ( Revisi ) 6.2.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.2.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 1"


Bahan An. SNI ( Revisi ) 6.3.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.3.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 1,25"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 1,5"


Bahan An. SNI ( Revisi ) 6.5.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.5.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 2"


Bahan An. SNI ( Revisi ) 6.6.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.6.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 2,5"


Bahan An. SNI ( Revisi ) 6.7.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.7.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 3"


Bahan An. SNI ( Revisi ) 6.7.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.7.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 4"


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan 0.00 = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 0.00 = Rp
0.225 Oh Tukang @ Rp. 0.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0068 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 6"


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 0.00 = Rp
0.225 Oh Tukang @ Rp. 0.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0068 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC AW ø 8"


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 0.00 = Rp
0.225 Oh Tukang @ Rp. 0.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0068 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 bh Clean out (FCO) 3" (80 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Clean out 3" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.200 Oh Pekerja @ Rp. 0.00 = Rp
0.200 Oh Tukang @ Rp. 0.00 = Rp
0.020 Oh Kepala tukang @ Rp. 0.00 = Rp
0.020 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Clean out (FCO) 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Clean out 6" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.200 Oh Pekerja @ Rp. 0.00 = Rp
0.200 Oh Tukang @ Rp. 0.00 = Rp
0.020 Oh Kepala tukang @ Rp. 0.00 = Rp
0.020 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Clean out (FCO) 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Clean out 2" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.020 Oh Kepala tukang @ Rp. 0.00 = Rp
0.020 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Clean out (FCO) 4" (100 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Clean out 4" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.020 Oh Kepala tukang @ Rp. 0.00 = Rp
0.020 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa PVC D ø 1,25"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC D ø 2"


Bahan An. SNI ( Revisi ) 6.6.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.6.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC D ø 4"


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 0.00 = Rp
0.225 Oh Tukang @ Rp. 0.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0068 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC D ø 3"


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 0.00 = Rp
0.225 Oh Tukang @ Rp. 0.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0068 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PVC D ø 1"


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 0.00 = Rp
0.225 Oh Tukang @ Rp. 0.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0068 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PPR PN-10 ø 3"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp
Memasang 1 m' pipa PPR PN-10 ø 4"
Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa PPR PN-10 ø 1 1/4"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.018 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 bh Butterfly valve 10K "toyo" 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Butterfly valve 6" @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.015 Oh Kepala tukang @ Rp. 0.00 = Rp
0.010 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 bh WLC + Panel


Bahan An. SNI ( Revisi ) 6.33.1
1 bh WLC + Panel @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.015 Oh Kepala tukang @ Rp. 0.00 = Rp
0.010 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 bh PI
Bahan An. SNI ( Revisi ) 6.33.1
1 bh PI @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.015 Oh Kepala tukang @ Rp. 0.00 = Rp
0.010 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 bh roof drain dia. 3" besi cor


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Roof drain @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.020 Oh Kepala tukang @ Rp. 0.00 = Rp
0.020 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh roof drain dia. 4" besi cor


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Roof drain @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.020 Oh Kepala tukang @ Rp. 0.00 = Rp
0.020 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh pompa diesel (pemadam kebakaran)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh diesel fire pump @ Rp. 0.00 = Rp
1 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
2.000 Oh Pekerja @ Rp. 0.00 = Rp
2.000 Oh Tukang @ Rp. 0.00 = Rp
1.000 Oh Kepala tukang @ Rp. 0.00 = Rp
1.000 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh jockey pump (pemadam kebakaran)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh jockey pump @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh elektrik pump (pemadam kebakaran)


Bahan An. SNI ( Revisi ) 6.33.1
1 bh electric pump @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 1/2"


Bahan An. SNI ( Revisi ) 6.9.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 3/4"


Bahan An. SNI ( Revisi ) 6.10.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.10.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 1"


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 1,25"


Bahan An. SNI ( Revisi ) 6.12.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.12.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang 1 m' pipa BSP sch. 40 ø 1,5"
Bahan An. SNI ( Revisi ) 6.13.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.13.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 2"


Bahan An. SNI ( Revisi ) 6.14.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.14.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 2,5"


Bahan An. SNI ( Revisi ) 6.15.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.15.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.250 Oh Tukang las @ Rp. 0.00 = Rp
0.100 Oh Tukang cat @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 3"


Bahan An. SNI ( Revisi ) 6.16.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.16.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.250 Oh Tukang las @ Rp. 0.00 = Rp
0.160 Oh Tukang cat @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 4"


Bahan An. SNI ( Revisi ) 6.17.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.17.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.250 Oh Tukang las @ Rp. 0.00 = Rp
0.160 Oh Tukang cat @ Rp. 0.00 = Rp
0.0054 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 5"


Bahan An. SNI ( Revisi ) 6.18.1
1.000 m' Pipa PPR PN 10 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.18.2
0.135 Oh Pekerja @ Rp. 0.00 = Rp
0.225 Oh Tukang @ Rp. 0.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 0.00 = Rp
0.250 Oh Tukang las @ Rp. 0.00 = Rp
0.240 Oh Tukang cat @ Rp. 0.00 = Rp
0.0068 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 6"


Bahan An. SNI ( Revisi ) 6.19.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.19.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.290 Oh Tukang las @ Rp. 0.00 = Rp
0.200 Oh Tukang cat @ Rp. 0.00 = Rp
0.0070 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 8"


Bahan An. SNI ( Revisi ) 6.19.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.19.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.290 Oh Tukang las @ Rp. 0.00 = Rp
0.200 Oh Tukang cat @ Rp. 0.00 = Rp
0.0070 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa BSP sch. 40 ø 10"


Bahan An. SNI ( Revisi ) 6.19.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.19.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.290 Oh Tukang las @ Rp. 0.00 = Rp
0.200 Oh Tukang cat @ Rp. 0.00 = Rp
0.0070 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m c/w coupling machino
jet nozzel, hydran valve 1,5" dan 2,5", dan hose rack
Bahan An. SNI ( Revisi ) 6.33.1
1 bh IHB @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 0.00 = Rp
0.250 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Ooutdoor Hydran Box (OHB) Type C, termasuk fire hose 2,5"x30 m c/w coupling machino
jet nozzel 2,5"
Bahan An. SNI ( Revisi ) 6.33.1
1 bh OHB @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.180 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Hydran pillar 2 ways


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Pillar hydran @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.400 Oh Pekerja @ Rp. 0.00 = Rp
0.400 Oh Tukang @ Rp. 0.00 = Rp
0.050 Oh Kepala tukang @ Rp. 0.00 = Rp
0.050 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Siamesse connection


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Siamesse connect@ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.400 Oh Pekerja @ Rp. 0.00 = Rp
0.400 Oh Tukang @ Rp. 0.00 = Rp
0.050 Oh Kepala tukang @ Rp. 0.00 = Rp
0.050 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Fire Extinguisher


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Fire Extinguisher @ Rp. 0.00 = Rp
5 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.020 Oh Kepala tukang @ Rp. 0.00 = Rp
0.020 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Fire Extinguisher


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Fire Extinguisher @ Rp. 0.00 = Rp
5 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.020 Oh Kepala tukang @ Rp. 0.00 = Rp
0.020 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' pipa GIP med ø 1"


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m' Pipa GIP @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 unit sumur resapan


Bahan An. SNI ( Revisi ) 6.33.1
1 unit sumur resapan @ Rp. 0.00 = Rp
1 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.500 Oh Pekerja @ Rp. 0.00 = Rp
1.500 Oh Tukang @ Rp. 0.00 = Rp
1.000 Oh Kepala tukang @ Rp. 0.00 = Rp
1.000 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 unit Septic Tank 25 m3


Bahan An. SNI ( Revisi ) 6.33.1
1 unit Septic Tank Kap. @ Rp. 0.00 = Rp
5 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
2.000 Oh Pekerja @ Rp. 0.00 = Rp
2.000 Oh Tukang @ Rp. 0.00 = Rp
1.500 Oh Kepala tukang @ Rp. 0.00 = Rp
1.500 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh tangki toren


Bahan An. SNI ( Revisi ) 6.33.1
1 bh tangki air 2,5 m3 @ Rp. 0.00 = Rp
1 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.000 Oh Pekerja @ Rp. 0.00 = Rp
1.200 Oh Tukang @ Rp. 0.00 = Rp
0.300 Oh Kepala tukang @ Rp. 0.00 = Rp
0.360 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang 1 bh pompa Booster
Bahan An. SNI ( Revisi ) 6.32.1
1 bh Booster Pump @ Rp. 0.00 = Rp
1 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh pompa transfer


Bahan An. SNI ( Revisi ) 6.32.1
1 bh Booster Pump @ Rp. 0.00 = Rp
1 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh pompa deepwell


Bahan An. SNI ( Revisi ) 6.32.1
1 bh Deepwell @ Rp. 0.00 = Rp
1 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh GV dia. 200


Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 200 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh GV dia. 150


Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 150 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh GV dia. 100


Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 100 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh GV dia. 65
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 65 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh GV dia. 50
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh GV dia. 32
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 32 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh ST dia. 150


Bahan An. SNI ( Revisi ) 6.33.1
1 bh ST dia. 150 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang 1 bh ST dia. 65
Bahan An. SNI ( Revisi ) 6.33.1
1 bh ST dia. 65 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh ST dia. 32
Bahan An. SNI ( Revisi ) 6.33.1
1 bh ST dia. 32 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh FJ dia. 150


Bahan An. SNI ( Revisi ) 6.33.1
1 bh FJ dia. 150 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh FJ dia. 65
Bahan An. SNI ( Revisi ) 6.33.1
1 bh FJ dia. 65 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh FJ dia. 32
Bahan An. SNI ( Revisi ) 6.33.1
1 bh FJ dia. 32 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh FM dia. 150


Bahan An. SNI ( Revisi ) 6.33.1
1 bh FM dia. 150 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh MCV dia. 150 + Alarn Gong


Bahan An. SNI ( Revisi ) 6.33.1
1 bh MCV dia. 150 + Al@ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh SRV dia. 100


Bahan An. SNI ( Revisi ) 6.33.1
1 bh SRV dia. 100 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Anti vortex tyco


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Anti vortex tyco @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Pressure Indikator


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Pressure Indikator@ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang 1 bh Air Vent (AV)
Bahan An. SNI ( Revisi ) 6.33.1
1 bh Air Vent (AV) @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh GV dia. 80
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 80 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh CV dia. 100


Bahan An. SNI ( Revisi ) 6.33.1
1 bh CV dia. 100 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh BCV dia. 100


Bahan An. SNI ( Revisi ) 6.33.1
1 bh BCV dia. 100 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh LV dia. 80
Bahan An. SNI ( Revisi ) 6.33.1
1 bh LV dia. 80 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh GV dia. 25
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 25 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh PRV dia. 40


Bahan An. SNI ( Revisi ) 6.33.1
1 bh PRV dia. 40 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh TDV dia. 40


Bahan An. SNI ( Revisi ) 6.33.1
1 bh TDV dia. 40 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh sprinkle
Bahan An. SNI ( Revisi ) 6.33.1
1 bh Sprinkle @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh CV dia. 50
Bahan An. SNI ( Revisi ) 6.33.1
1 bh CV dia. 50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang 1 bh ST dia. 50
Bahan An. SNI ( Revisi ) 6.33.1
1 bh ST dia. 50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh FJ dia. 50
Bahan An. SNI ( Revisi ) 6.33.1
1 bh FJ dia. 50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Foot Valve dia.50


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Foot Valve dia.50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Float Valve dia.50


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Float Valve dia.50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh pressure gauge


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Pressure gauge @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set GIP med dia. 80 ( pipa header )


Bahan An. SNI ( Revisi ) 6.10.1
1.000 set GIP med dia. 80 ( @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.10.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set GIP med dia. 80 ( pipa header )


Bahan An. SNI ( Revisi ) 6.10.1
1.000 set GIP med dia. 80 ( @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.10.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set Instalasi pemipaan area pompa


Bahan An. SNI ( Revisi ) 6.10.1
1.000 set Instalasi pemipaa @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.10.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set Meteran Air c/w GV dia. 50 & Box Meteran


Bahan An. SNI ( Revisi ) 6.10.1
1.000 set Meteran Air c/w G@ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.10.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m' Pipa Gip Dia 100


Bahan An. SNI ( Revisi ) 6.9.1
1.000 m' Pipa Gip Dia 100 @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang 1 m 1000 x 300
Bahan An. SNI ( Revisi ) 6.33.1
1 bh 1000 x 300 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 m 700 x 300


Bahan An. SNI ( Revisi ) 6.33.1
1 bh 700 x 300 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh SAG 800 x 300


Bahan An. SNI ( Revisi ) 6.33.1
1 bh SAG 800 x 300 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set Instalasi daya listrik


Bahan An. SNI ( Revisi ) 6.33.1
1 set Instalasi daya listr @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 unit PLATFORM / KERETA


Bahan An. SNI ( Revisi ) 6.9.1
1.000 unit PLATFORM / KERE@ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 unit HOIST TAKAHASHI YJ - 99


Bahan An. SNI ( Revisi ) 6.9.1
1.000 unit HOIST TAKAHASHI@
Y Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 unit WIRE WINDER


Bahan An. SNI ( Revisi ) 6.9.1
1.000 unit WIRE WINDER @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 unit PANEL CONTROL


Bahan An. SNI ( Revisi ) 6.9.1
1.000 unit PANEL CONTROL @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set WIRE ROPE


Bahan An. SNI ( Revisi ) 6.9.1
1.000 set WIRE ROPE @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set KABEL ELECTRIC


Bahan An. SNI ( Revisi ) 6.9.1
1.000 set KABEL ELECTRIC @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang 1 set Konstruksi david socket arm (galvanized)
Bahan An. SNI ( Revisi ) 6.9.1
1.000 set Konstruksi david s@ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 pcs Plate sitting david socket arm (galvanized)


Bahan An. SNI ( Revisi ) 6.9.1
1.000 pcs Plate sitting davi @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 titik Angkore plate sitting (angkore, bolt & nut, pengelasan)
Bahan An. SNI ( Revisi ) 6.9.1
1.000 titik Angkore plate sitt @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 pcs Plate tie back (Galvanized)


Bahan An. SNI ( Revisi ) 6.9.1
1.000 pcs Plate tie back (Ga @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set Angkote plate tie back (angkore, bolt & nut, pengelasan)
Bahan An. SNI ( Revisi ) 6.9.1
1.000 set Angkote plate tie @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set Test commisioning dan training


Bahan An. SNI ( Revisi ) 6.9.1
1.000 set Test commisioning@ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 set Akomoadasi dan transportasi


Bahan An. SNI ( Revisi ) 6.9.1
1.000 set Akomoadasi dan tr@ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

` Memasang 1 set SAFETY BODY HARNESS


Bahan An. SNI ( Revisi ) 6.9.1
1.000 set SAFETY BODY HAR@ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 unit Pasangger Lif


Bahan An. SNI ( Revisi ) 6.33.1
1 unit Pasangger Lif @ Rp. 0.00 = Rp
1 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
2.000 Oh Pekerja @ Rp. 0.00 = Rp
2.000 Oh Tukang @ Rp. 0.00 = Rp
1.000 Oh Kepala tukang @ Rp. 0.00 = Rp
1.000 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 unit Service/Fireman's Lif


Bahan An. SNI ( Revisi ) 6.33.1
1 unit Service/Fireman's @ Rp. 0.00 = Rp
1 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
2.000 Oh Pekerja @ Rp. 0.00 = Rp
2.000 Oh Tukang @ Rp. 0.00 = Rp
1.000 Oh Kepala tukang @ Rp. 0.00 = Rp
1.000 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang 1 unit Pemasangan Lif Passenger
Bahan An. SNI ( Revisi ) 6.9.1
1.000 unit Pemasangan Lif P@ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 unit Pemasangan Lif Service


Bahan An. SNI ( Revisi ) 6.9.1
1.000 unit Pemasangan Lif S@ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh AC
Bahan An. SNI ( Revisi ) 6.31.1
1 bh AC 3/4 pk @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' Pipa refrigerant + isolasi dia. 1/4" dan 3/8"


Bahan An. SNI ( Revisi ) 6.2.1
1.000 m' Pipa refrigerant + @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.2.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 m' Pipa drain Pvc AW + isolasi dia. 1/2"


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC AW @ Rp. 0.00 = Rp
35 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 0.00 = Rp
0.225 Oh Tukang @ Rp. 0.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0068 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 set Alat bantu dan Test Commissioning


Bahan An. SNI ( Revisi ) 6.9.1
1.000 set Alat bantu dan Te @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 bh Exhaust Fan (EF-01 s/d 8/LT.Dasar)


Bahan An. SNI ( Revisi ) 6.31.1
1 bh Exhaust Fan (EF-01@ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 bh EAG 800 x 300


Bahan An. SNI ( Revisi ) 6.33.1
1 bh EAG 800 x 300 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

Memasang 1 bh AC
Bahan An. SNI ( Revisi ) 6.31.1
0.00 1 bh AC 1/2 pk @ Rp.
0.00 10 % Perlengkapan
0.00 Sub total :
Upah An. SNI ( Revisi ) 6.32.2
0.00 1.300 Oh Pekerja @ Rp.
0.00 1.700 Oh Tukang @ Rp.
0.00 0.700 Oh Kepala tuka@ Rp.
0.00 0.700 Oh Mandor @ Rp.
0.00 Sub total :
0.00 Total upah+bahan :

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00 = Rp 0.00
= Rp 0.00
Sub total : = Rp 0.00

0.00 = Rp 0.00
0.00 = Rp 0.00
0.00 = Rp 0.00
0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00
DAFTAR HARGA BAHAN BANGUNAN

HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5

A BAHAN PIPA PPR PN-10


1 Pipa PPR PN-10 1/2" (20 mm) m Rp.
2 Pipa PPR PN-10 3/4" (25 mm) m Rp.
3 Pipa PPR PN-10 1/4" (15 mm) m Rp.
4 Pipa PPR PN-10 1" (32 mm) m Rp.
5 Pipa PPR PN-10 1,25" (40 mm) m Rp.
6 Pipa PPR PN-10 1,5" (50 mm) m Rp.
7 Pipa PPR PN-10 2" (63 mm) m Rp.
8 Pipa PPR PN-10 2,5" (75 mm) m Rp.
9 Pipa PPR PN-10 3" (90 mm) m Rp.
10 Pipa PPR PN-10 4" (110 mm) m Rp.
B BAHAN PIPA PVC AW
1 Pipa PVC AW 1/2" (15 mm) m Rp.
2 Pipa PVC AW 3/4" (20 mm) m Rp.
3 Pipa PVC AW 1" (25 mm) m Rp.
4 Pipa PVC AW 1,25" (32 mm) m Rp.
5 Pipa PVC AW 1,5" (40 mm) m Rp.
6 Pipa PVC AW 2" (50 mm) m Rp.
7 Pipa PVC AW 2,5" (65 mm) m Rp.
8 Pipa PVC AW 3" (80 mm) m Rp.
9 Pipa PVC AW 4" (100 mm) m Rp.
10 Pipa PVC AW 6" (150 mm) m Rp.
11 Pipa PVC AW 8" (200 mm) m Rp.
12 Pipa PVC D 1" (25 mm) m Rp.
13 Pipa PVC D 1,25" (32 mm) m Rp.
14 Pipa PVC D 2" (50 mm) m Rp.
15 Pipa PVC D 3" (75 mm) m Rp.
16 Pipa PVC D 4" (100 mm) m Rp.
C BAHAN PIPA BESI BSP SCH.40
1 Pipa BSP sch. 40 1" (25 mm) m Rp.
Pipa BSP sch. 40 1/2" (12,5 mm) m Rp.
Pipa BSP sch. 40 3/4" (15 mm) m Rp.
2 Pipa BSP sch. 40 1,25" (32 mm) m Rp.
3 Pipa BSP sch. 40 1,5" (40 mm) m Rp.
4 Pipa BSP sch. 40 2" (50 mm) m Rp.
5 Pipa BSP sch. 40 2,5" (65 mm) m Rp.
6 Pipa BSP sch. 40 3" (80 mm) m Rp.
7 Pipa BSP sch. 40 4" (100 mm) m Rp.
8 Pipa BSP sch. 40 5" (125 mm) m Rp.
9 Pipa BSP sch. 40 6" (150 mm) m Rp.
Pipa BSP sch. 40 8" (200 mm) m Rp.
Pipa BSP sch. 40 10" (250 mm) m Rp.
10 Pipa sch. 40 8" (200 mm) Warna Putih m Rp.
11 Pipa sch. 40 6" (150 mm) Warna Putih m Rp.
12 Pipa sch. 40 4" (100 mm) Warna Putih m Rp.
13 Pipa sch. 40 3" (65 mm) Warna Putih m Rp.
14 Pipa sch. 40 2" (50 mm) Warna Putih m Rp.
D BAHAN PIPA GIP med
1 Pipa GIP Medium Class dia 100 mm2 m Rp.
2 Pipa GIP Medium Class dia 80 mm2 m Rp.
3 Pipa GIP Medium Class dia 65 mm2 m Rp.
4 Pipa GIP Medium Class dia 50 mm2 m Rp.
5 Pipa GIP Medium Class dia 40 mm2 m Rp.
6 Pipa GIP Medium Class dia 32 mm2 m Rp.
7 Pipa GIP Medium Class dia 25 mm2 m Rp.
8 Pipa GIP Medium Class dia 20 mm2 m Rp.
9 Pipa GIP Medium Class dia 15 mm2 m Rp.
10 Pipa Header GIP dia 100 mm2 Unit Rp.
11 Pipa Header GIP dia 200 mm2 Unit Rp.
E BAHAN POMPA & TOREN
1 Pompa air shallow well Bh Rp.
2 Pompa hydran diesel 500 USGPM Bh Rp.
3 Pompa jockey 25 USGPM Bh Rp.
4 Pompa transfer 250 Lpm Bh Rp.
5 Booster Pump 2 x 120 lpm Bh Rp.
6 Panel Control Pompa Bh Rp.
7 Shallow Well 150 s/d 200 lpm Set Rp.
8 Toren air 3 m3 Bh Rp.
9 Jet Pump kap. 100 l/menit, Bh Rp.
10 Pengeboran sumur lot Rp.
11 Resapan 5 m3 unit Rp.
12 Septic Tank 11 m3 unit Rp.
13 Portable Grease Trap 30 L unit Rp.
14 Vent Cup dia. 80 mm Bh Rp.
15 Dop dia. 80 mm Bh Rp.
F BAHAN VALVE
1 Gate valve 10K 3/4" (20 mm) Bh Rp.
2 Gate valve 10K 1" (25 mm) Bh Rp.
3 Gate valve 10K 1,25" (32 mm) Bh Rp.
4 Gate valve 10K 1,5" (40 mm) Bh Rp.
5 Gate valve 10K 2" (50 mm) Bh Rp.
6 Gate valve 10K 2,5" (65 mm) Bh Rp.
7 Gate valve 10K 3" (80 mm) Bh Rp.
8 Gate valve 10K 4" (100 mm) Bh Rp.
9 Gate valve 10K 6" (150 mm) Bh Rp.
10 Gate valve 16K 2" (50 mm) Bh Rp.
11 Gate valve 16K 4" (100 mm) Bh Rp.
12 Gate valve 16K 6" (150 mm) Bh Rp.
13 Butterfly valve 10K 2" (50 mm) Bh Rp.
14 Butterfly valve 10K 6" (150 mm) Bh Rp.
15 Check valve 10K 2" (50 mm) Bh Rp.
16 Check valve 16K 4" (100 mm) Bh Rp.
17 Check valve 16K 6" (150 mm) Bh Rp.
18 strainer 10K 2" (50 mm) Bh Rp.
19 strainer 16K 2" (50 mm) Bh Rp.
20 strainer 16K 4" (100 mm) Bh Rp.
21 flexible joint 10K 2" (50 mm) Bh Rp.
22 flexible joint 10K 4" (100 mm) Bh Rp.
23 foot valve 10K 2" (50 mm) Bh Rp.
24 foot valve 10K 4" (100 mm) Bh Rp.
25 safety valve 10K 4" (100 mm) Bh Rp.
26 flow meter 10K 4" (100 mm) Bh Rp.
27 Roof drain 2" (50 mm) Bh Rp.
28 Roof drain 3" (80 mm) Bh Rp.
29 Roof drain 4" (100 mm) Bh Rp.
30 Roof drain 5" (125 mm) Bh Rp.
30 Floor drain 2" (50 mm) Bh Rp.
31 Clean out (FCO) 3" (80 mm) Bh Rp.
32 Clean out (FCO) 6" (150 mm) Bh Rp.
33 Clean out (FCO) 2" (50 mm) Bh Rp.
34 Clean out (FCO) 4" (100 mm) Bh Rp.
35 Pressure Switch Bh Rp.
36 Pressure Gauge Bh Rp.
37 Meter air dia. 20 mm Bh Rp.
38 Meter air dia. 50 mm Bh Rp.

G PERALATAN HYDRANT
1 Indoor Hydran Box (IHB) Type B Bh Rp.
2 Outdoor Hydran Box (OHB) Type C Bh Rp.
3 Hydran pillar 2 ways (Ex. lokal) Bh Rp.
4 Siamesse connection (ex. Local) Bh Rp.
5 Automatic Air Vent Bh Rp.
6 Fire Extinguisher Type CO2 Class B,C Kap. 4,6 kg bh Rp.
7 Fire Extinguisher Type Class A,B,C Kap. 3,5 kg Bh Rp.
Pressure Indicator (PI) Bh Rp.
Pompa Diesel Pemadam Kebakaran Bh Rp.
Jockey Pump Bh Rp.
Electrical Pump Bh Rp.

H FAN
1 Exhaust Ceiling Mounted Kap. 100 Cfm Bh Rp.
2 Grille 100x100 mm Bh Rp.

I 1 Waterheater Bh Rp.
WCL + Panel Bh Rp.

1 Sumur Resapan Bh Rp.


Septic Tank 25 m3 Bh Rp.

I Test Commisioning lot Rp.

GV dia. 200 bh Rp.


GV dia. 150 bh Rp.
GV dia. 100 bh Rp.
GV dia. 65 bh Rp.
GV dia. 50 bh Rp.
GV dia. 32 bh Rp.
ST dia. 150 bh Rp.
ST dia. 65 bh Rp.
ST dia. 32 bh Rp.
FJ dia. 150 bh Rp.
FJ dia. 65 bh Rp.
FJ dia. 32 bh Rp.
FM dia. 150 bh Rp.
MCV dia. 150 + Alarn Gong bh Rp.
SRV dia. 100 bh Rp.
Anti vortex tyco bh Rp.
Pressure Indikator bh Rp.
Air Vent (AV) bh Rp.
GV dia. 80 bh Rp.
CV dia. 100 bh Rp.
BCV dia. 100 bh Rp.
LV dia. 80 bh Rp.
GV dia. 25 bh Rp.
PRV dia. 40 bh Rp.
TDV dia. 40 bh Rp.
Sprinkle bh Rp.
CV dia. 100 bh Rp.
ST dia. 50 bh Rp.
FJ dia. 50 bh Rp.
Foot Valve dia.50 bh Rp.
Foot Valve dia.50 bh Rp.

GIP med dia. 80 ( pipa header ) set Rp.


Instalasi pemipaan area pompa lot Rp.
Meteran Air c/w GV dia. 50 & Box Meteran unit Rp.

Pengadaan Pipa Gip Dia 100 m Rp.

Ducting tanpa isolasi BJLS 100


1000 x 300 m Rp.
700 x 300 m Rp.
SAG 800 x 300 bh Rp.
EAG 800 x 300 bh Rp.
Instalasi daya listrik ttk Rp.

PLATFORM / KERETA unit Rp.

PANEL CONTROL unit Rp.


WIRE ROPE set Rp.
KABEL ELECTRIC set Rp.
DAVID SOCKET SYSTEM
Konstruksi david socket arm (galvanized) set Rp.
Plate sitting david socket arm (galvanized) pcs Rp.
Angkore plate sitting (angkore, bolt & nut, pengelasan) titik Rp.
Plate tie back (Galvanized) pcs Rp.
Angkote plate tie back (angkore, bolt & nut, pengelasan) set Rp.
LAIN - LAIN
Test commisioning dan training lot Rp.
Akomoadasi dan transportasi lot Rp.
SAFETY BODY HARNESS set Rp.

Pasangger Lift unit Rp.


Service/Fireman's Lift unit Rp.
Pemasangan Lift Passenger unit Rp.
Pemasangan Lift Service unit Rp.

AC Wall mounted (3/4 PK) unit Rp.


Pipa refrigerant + isolasi dia. 1/4" dan 3/8" m Rp.
Pipa drain Pvc AW + isolasi dia. 1/2" m Rp.
Kabel NYM 3 x 2,5 mm² + conduit 20 mm m Rp.
Alat bantu dan Test Commissioning lot Rp.

Exhaust Fan (EF-01 s/d 8/LT.Dasar) unit Rp.

AC Wall mounted (1/2 PK) unit Rp.


HARGA
SATUAN BAHAN
5
Memasang Panel SDP
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Panel SDP @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel DP-LT.Dasar


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh DP-LT.Dasar @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.500 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.600 Oh Tukang listrik @ Rp. 0.00 = Rp
0.400 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.250 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel DP-EMG


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh DP-EMG @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.500 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.600 Oh Tukang listrik @ Rp. 0.00 = Rp
0.400 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.250 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp

Memasang Panel DP-PL


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh DP-PL @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.500 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.600 Oh Tukang listrik @ Rp. 0.00 = Rp
0.400 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.250 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel P-UNIT


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh P-UNIT @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.500 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.600 Oh Tukang listrik @ Rp. 0.00 = Rp
0.400 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.250 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power ( NYY 1 x (4 x 16 mm2) + NYA 16 mm2 )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 1 x (4 x 16 mm2) @ Rp. 0.00 = Rp
1.000 m NYA 16 mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp

Memasang 1 M Kabel Power ( NYM 3x4 mm )


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m NYM 3x4 mm @ Rp. 0.00 = Rp
1.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.8.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Kabel Tray ( W=300 mm )


Bahan An. SNI ( Revisi ) 6.14.1
1.000 m Tray w=300 mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.14.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Elbow Kabel Tray ( W=300 mm )


Bahan An. SNI ( Revisi ) 6.15.1
1.000 bh Elbow w=300 mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.15.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp

Memasang Lampu DL SL 13 Watt


Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu DL SL 13 Watt @ Rp. 0.00 = Rp

5.000 % Perlengkapan instalasi = Rp


Sub total : = Rp
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.075 Oh Tukang listrik @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.030 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu DL LED 7 Watt


Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu DL LED 7 Watt @ Rp. 0.00 = Rp

5.000 % Perlengkapan instalasi = Rp


Sub total : = Rp
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.075 Oh Tukang listrik @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.030 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu DL EM 7 Watt


Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu DL EM 7 Watt @ Rp. 0.00 = Rp

5.000 % Perlengkapan instalasi = Rp


Sub total : = Rp
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.075 Oh Tukang listrik @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.030 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu Baret 10 Watt


Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu Baret 10 Watt @ Rp. 0.00 = Rp

5.000 % Perlengkapan instalasi = Rp


Sub total : = Rp
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.075 Oh Tukang listrik @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.030 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu TL Balk EM 36 Watt


Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu TL Balk EM 36 Watt @ Rp. 0.00 = Rp

5.000 % Perlengkapan instalasi = Rp


Sub total : = Rp
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.075 Oh Tukang listrik @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.030 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu Exit LED 8 Watt


Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu Exit LED 8 Watt @ Rp. 0.00 = Rp

5.000 % Perlengkapan instalasi = Rp


Sub total : = Rp
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.075 Oh Tukang listrik @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.030 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu 26 Watt


Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu 26 Watt @ Rp. 0.00 = Rp

5.000 % Perlengkapan instalasi = Rp


Sub total : = Rp
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.075 Oh Tukang listrik @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.030 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Stop Kontak daya


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak 6 A @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.18.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Stop Kontak-AC


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak-AC @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.18.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Saklar tunggal


Bahan An. SNI ( Revisi ) 6.21.1
1.000 bh saklar tunggal @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.21.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Sakalr Ganda


Bahan An. SNI ( Revisi ) 6.22.1
1.000 bh Saklar ganda @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.22.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah instalasi titik Lampu


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m NYA 3 x 2,5 mm2 @ Rp. 0.00 = Rp
6.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pembantu tukang listrik @ Rp. 0.00 = Rp
0.150 Oh Tukang listrik @ Rp. 0.00 = Rp
0.180 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.150 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp

Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah Instalasi titik Stop Kontak


Bahan An. SNI ( Revisi ) 6.4.1
11.000 m NYA 3 x 2,5 mm2 @ Rp. 0.00 = Rp
9.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.4.2
0.150 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.150 Oh Tukang listrik @ Rp. 0.00 = Rp
0.180 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.150 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel PB-LT.Atap


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh PB-LT.Atap @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel PB-Lif.P1


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh PB-Lif.P1 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel P-Booster


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh P-Booster @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel P-EMG Atap


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh P-EMG Atap @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel PB-TK.1


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh PB-TK.1 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel PB-PF.1


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh PB-PF.1 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel PK-LS


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh PK-LS @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel PUTR


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh PUTR @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel Kapasitor Bank


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Panel Kapasitor Bank @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power ( N2XSEBY 3 x 120 mm² + BC 120 mm2 )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m N2XSEBY 3 x 120 mm² @ Rp. 0.00 = Rp
1.000 m BC 120 mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power ( NYY 4 x (1c x 300) mm2 + NYA 150 mm² )
Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 4 x (1c x 300) mm2 @ Rp. 0.00 = Rp
1.000 m NYA 150 mm² @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power ( NYY 4 x (1c x 150) mm2 + NYA 70 mm )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 4 x (1c x 150) mm2 @ Rp. 0.00 = Rp
1.000 m NYA 70 mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power ( NYY 4 x 10 mm²m )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 4 x 10 mm² @ Rp. 0.00 = Rp
1.000 m @ Rp. = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power (NYY 4 x 4 mm²mm )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 4 x 4 mm²mm @ Rp. 0.00 = Rp
1.000 m NYA 4mm2 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power (FRC 4 x 4 mm² + NYA 4 mm² )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m FRC 4 x 4 mm² @ Rp. 0.00 = Rp
1.000 m NYA 4 mm² @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power (FRC 4 x 10 mm² + BC 10 mm²)


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m FRC 4 x 10 mm² @ Rp. 0.00 = Rp
1.000 m BC 10 mm² @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power (NYY 8 x (1C x 120 mm²) + BC 120 mm²)


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 8 x (1C x 120 mm²) @ Rp. 0.00 = Rp
1.000 m BC 120 mm² @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power (NYY 8 x (1C x 240 mm²) + BC 120 mm²)


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 8 x (1C x 240 mm²) @ Rp. 0.00 = Rp
1.000 m BC 120 mm² @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu T-Bulk-18 watt


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Lampu TL Bulk-18W @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.33.2
0.120 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.150 Oh Tukang listrik @ Rp. 0.00 = Rp
0.100 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.075 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu Taman (t=2,5 m)


Bahan An. SNI ( Revisi ) 6.30.1
1.000 bh Lampu Taman-SL26W @ Rp. 0.00 = Rp
1.000 lt Tiang Lampu 2.5 m @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.30.2
0.250 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.300 Oh Tukang listrik @ Rp. 0.00 = Rp
0.150 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.100 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah instalasi titik Lampu Luar


Bahan An. SNI ( Revisi ) 6.3.1
15.000 m Kabel NYFGBY 3x2,5 mm2 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.3.2
0.035 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.035 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Testing & Commissioning


Bahan An. SNI ( Revisi ) 6.55.1
1.000 ls Testing & Commissioning @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah Grounding Rod Gip 1"


Bahan An. SNI ( Revisi ) 6.39.1
1.000 bh gronding rod Gip 1" @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.39.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah Termination


Bahan An. SNI ( Revisi ) 6.39.1
1.000 ls Termination @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.39.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel pentanahan ( BC 70 mm )


Bahan An. SNI ( Revisi ) 6.40.1
1.000 m BC-50 mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.40.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel pentanahan ( NYY 70 mm )


Bahan An. SNI ( Revisi ) 6.41.1
1.000 m NYY 70 mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.41.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 M Kabel pentanahan ( coaxial cable 7C - 2V 750 ohm )


Bahan An. SNI ( Revisi ) 6.41.1
1.000 m coaxial cable 7C - 2V 750 ohm@ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.41.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang Stop Kontak-TV


Bahan An. SNI ( Revisi ) 6.19.1
1.000 bh Stop kontak-TV @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.19.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah Instalasi titik TV


Bahan An. SNI ( Revisi ) 6.6.1
15.000 m coaxial cable 7C - 2V 750 ohm@ Rp. 0.00 = Rp
15.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.6.2
0.150 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.150 Oh Tukang listrik @ Rp. 0.00 = Rp
0.180 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.150 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Splitter 4 Ways


Bahan An. SNI ( Revisi ) 6.16.1
1.000 bh Splitter 4 Ways @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.16.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Tap off 2 Ways


Bahan An. SNI ( Revisi ) 6.16.1
1.000 bh Tap off 2 Ways @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.16.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang MCFA
Bahan An. SNI ( Revisi ) 6.29.1
1.000 bh MCFA-10 Zone @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.29.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel pentanahan ( FRC 2 x 1,5 mm ² )


Bahan An. SNI ( Revisi ) 6.41.1
1.000 m FRC 2 x 1,5 mm ² @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.41.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 M Kabel pentanahan ( FRC 2 x 2,5 mm ² )


Bahan An. SNI ( Revisi ) 6.41.1
1.000 m FRC 2 x 2,5 mm ² @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.41.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 M Kabel pentanahan ( FRC STP AWG 16 1 Pairs + Kabel Power FRC 3 x 2,5 mm ² )
Bahan An. SNI ( Revisi ) 6.41.1
1.000 m FRC STP AWG 16 1 Pairs @ Rp. 0.00 = Rp
1.000 m Kabel Power FRC 3 x 2,5 mm ²@ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.41.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang 1 buah Terminal Fire Alarm


Bahan An. SNI ( Revisi ) 6.44.1
1.000 bh Terminal Fire Alarm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.44.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah Antena UHF


Bahan An. SNI ( Revisi ) 6.45.1
1.000 bh Antena UHF @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.45.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah Antena VHF


Bahan An. SNI ( Revisi ) 6.46.1
1.000 bh Antena UHF @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.46.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Master Amplifier ( MIXER )


Bahan An. SNI ( Revisi ) 6.47.1
1.000 m Master Amplifier @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.47.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp

Memasang Manual push button


Bahan An. SNI ( Revisi ) 6.23.1
1.000 bh manual push button @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.23.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah instalasi titik Manual PUSH BUTTON


Bahan An. SNI ( Revisi ) 6.24.1
20.000 m Kabel NYA 2x1,5 mm2 @ Rp. 0.00 = Rp
20.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.24.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Bell Alarm


Bahan An. SNI ( Revisi ) 6.25.1
1.000 bh Bell Alarm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.25.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah instalasi titik Bell Alarm


Bahan An. SNI ( Revisi ) 6.26.1
20.000 m Kabel NYA 2x1,5 mm2 @ Rp. 0.00 = Rp
20.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.26.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu indikator


Bahan An. SNI ( Revisi ) 6.27.1
1.000 bh Indikator Lamp @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.27.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah instalasi titik Lampu indikator


Bahan An. SNI ( Revisi ) 6.28.1
20.000 m Kabel NYA 2x2,5 mm2 @ Rp. 0.00 = Rp
20.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
% Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.28.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Remote lamp


Bahan An. SNI ( Revisi ) 6.27.1
1.000 bh Remote lamp @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.27.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah instalasi titik Lampu indikator


Bahan An. SNI ( Revisi ) 6.28.1
20.000 m Kabel NYA 2x2,5 mm2 @ Rp. 0.00 = Rp
20.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
% Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.28.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Heat Detector


Bahan An. SNI ( Revisi ) 6.53.1
1.000 bh Heat detector @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.53.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Smoke Detector


Bahan An. SNI ( Revisi ) 6.54.1
1.000 bh Smoke detector @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah Instalasi titik Detector


Bahan An. SNI ( Revisi ) 6.5.1
15.000 m Kabel NYA 2x1,5 mm2 @ Rp. 0.00 = Rp
12.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.5.2
0.150 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.150 Oh Tukang listrik @ Rp. 0.00 = Rp
0.180 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.150 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang MDF-TS
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh MDF-TS @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Power Surge Arrester


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Power Surge Arrester @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Ceilling Speaker


Bahan An. SNI ( Revisi ) 6.54.1
1.000 bh Ceilling Speaker @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Wall Speaker


Bahan An. SNI ( Revisi ) 6.54.1
1.000 bh Wall Speaker @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah instalasi titik speaker


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m NYMHY 2 x 1,5 mm2 @ Rp. 0.00 = Rp
6.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pembantu tukang listrik @ Rp. 0.00 = Rp
0.150 Oh Tukang listrik @ Rp. 0.00 = Rp
0.180 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.150 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp

Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah instalasi titik cctv


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m STP AWG 1 Pair @ Rp. 0.00 = Rp
6.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pembantu tukang listrik @ Rp. 0.00 = Rp
0.150 Oh Tukang listrik @ Rp. 0.00 = Rp
0.180 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.150 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp

Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Panel PUTM


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Panel SDP @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power ( NYY 4x4 mm + NYA 4 mm )


Bahan An. SNI ( Revisi ) 6.10.1
1.000 m NYY 4x4 mm @ Rp. 0.00 = Rp
1.000 m NYA 4 mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.030 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.030 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Penangkal Petir


Bahan An. SNI ( Revisi ) 6.17.1
1.000 bh Split penyalur petir non radio @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.17.2
1.000 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
1.500 Oh Tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.500 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Tiang Pipa dia 65 = 5 mtr + asesories


Bahan An. SNI ( Revisi ) 6.17.1
5.000 bh Tiang pipa dia 65 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.17.2
0.750 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
1.000 Oh Tukang listrik @ Rp. 0.00 = Rp
0.600 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.400 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel pentanahan ( BC 50 mm )


Bahan An. SNI ( Revisi ) 6.40.1
1.000 m BC-50 mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.40.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 buah Grounding box


Bahan An. SNI ( Revisi ) 6.38.1
1.000 bh Box 40x40x40cm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.38.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Testing & Comissioning included perijinan dari DEPNAKER


Bahan An. SNI ( Revisi ) 6.55.1
1.000 ls Testing & Comissioning inclu @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Biaya Instalasi
Bahan An. SNI ( Revisi ) 6.55.1
1.000 ls Biaya Instalasi @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Material Bantu
Bahan An. SNI ( Revisi ) 6.55.1
1.000 ls Material Bantu @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Bracket, Seal , Test Box , dls


Bahan An. SNI ( Revisi ) 6.55.1
1.000 ls Bracket, Seal , Test Box , dls @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Inverter 220V/50 Hz


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Inverter 220V/50 Hz @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Modulator
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Modulator @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Divider
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Divider @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Booster Amplifier


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Booster Amplifier @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang TV Monitor Test Point


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh TV Monitor Test Point @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Head End CATV


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Head End CATV @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Main Booster


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Main Booster @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Main Splitter


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Main Splitter @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Jack intercom


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Jack intercom @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Master interkom


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Master interkom @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang UPS 2 KVA


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh UPS 2 KVA @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Announciator
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Announciator @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Tamper switch


Bahan An. SNI ( Revisi ) 6.54.1
1.000 bh Tamper switch @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Flow switch


Bahan An. SNI ( Revisi ) 6.54.1
1.000 bh Flow switch @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Selector 20 zone


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Selector 20 zone @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Power Amplier 240 Watt


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Power Amplier 240 Watt @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang UPS 1 KVA


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh UPS 1 KVA @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Mixer
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Mixer @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang MP3 DVD/CD/CDR


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh MP3 DVD/CD/CDR @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Sirine module


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Sirine module @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Pre Amplifier 120 Watt


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Pre Amplifier 120 Watt @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Microphone control


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Microphone control @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang DVR 2 x 16 Port


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh DVR 2 x 16 Port @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang LED Monitor 32"


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh LED Monitor 32" @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp

Memasang Fixed dome camera


Bahan An. SNI ( Revisi ) 6.23.1
1.000 bh Fixed dome camera @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.23.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Penyambungan PLN


Bahan An. SNI ( Revisi ) 6.55.1
1.000 VA VA @ Rp. 0.00 = Rp
% Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.55.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Transformator
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Transformator @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp

Memasang Vending system


Bahan An. SNI ( Revisi ) 6.23.1
1.000 bh Vending system @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.23.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang KWH Meter Prabayar 1 Ph


Bahan An. SNI ( Revisi ) 6.23.1
1.000 bh KWH Meter Prabayar 1 Ph @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.23.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Genset
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Genset @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang Instalasi Genset
Bahan An. SNI ( Revisi ) 6.23.1
1.000 set Instalasi Genset @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.23.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power ( FRC 4 x 185 mm2 + BC 70 mm2 )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m FRC 4 x 185 mm2 + BC 70 mm@ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Power ( FRC 4 x 4 mm2 + BC 4 mm22 )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m FRC 4 x 4 mm2 + BC 4 mm2 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
Memasang Pressurized Fan 10.000 Cfm
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Pressurized Fan 10.000 Cfm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang 1 M Kabel Kabel NYM 3 x 2,5 mm² + conduit 20 mm


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m Kabel NYM 3 x 2,5 mm² + con@ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lampu taman HPL - N 2 x 80W Tiang 6 - 12 m


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Lampu taman HPL - N 2 x 80W@ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.33.2
0.120 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.150 Oh Tukang listrik @ Rp. 0.00 = Rp
0.100 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.075 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Pressurized Fan 480 Cfm


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Pressurized Fan 480 Cfm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Pressurized Fan 690 Cfm


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Pressurized Fan 690 Cfm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lif Controller


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Lif Controller @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Expantion lif controller


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Expantion lif controller @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Wiegand Reader With Proximity


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Wiegand Reader With Proximi@ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang PSU Set


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh PSU Set @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Lisence-Sof-WEB- Each Lif


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Lisence-Sof-WEB- Each Lif @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang PC Server
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh PC Server @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Proximity Card


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Proximity Card @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Kabel UTP CAT 6


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Kabel UTP CAT 6 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Pipa Conduit 20mm


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Pipa Conduit 20mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Kabel AWG 18


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Kabel AWG 18 @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Switch Hub 8 port


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Switch Hub 8 port @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Kabel Power NYM 2x2.5mm


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Kabel Power NYM 2x2.5mm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Transportasi Akomodasi Keamanan dan Keselamatan Kerja


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Transportasi Akomodasi Keam@ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Pekerjaan perapihan


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Pekerjaan perapihan @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Material & alat bantu


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Material & alat bantu @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp

Memasang Testing & Comissioning instalasi


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Testing & Comissioning instala@ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp

Total upah+bahan : = Rp
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
DAFTAR HARGA BAHAN BANGUNAN

HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5

A BAHAN ELEKTRIKAL
1 Pasang listrik /Wiring Ttk Rp.
2 Lampu TL 1 x 10 w Bh Rp.
3 Lampu TL 1 x 20 w Bh Rp.
4 Lampu TL 1 x 40 w Bh Rp.
5 Lampu pijar 25 w Bh Rp.
6 Lampu pijar 40 - 100 w Bh Rp.
7 Lampu TKI, TL 2x36 watt Bh Rp.
8 Lampu V-SHAPE, TL 2x36 watt Bh Rp.
9 Lampu TL Balk 1x18 watt Bh Rp.
10 Lampu TL Balk 1x18 watt + Battery Bh Rp.
11 Lampu TL Balk 1x36 watt Bh Rp.
12 Lampu Baret 32 watt + Battery Bh Rp.
13 Lampu Baret 32 watt Bh Rp.
Lampu Baret 10 watt Bh Rp.
Lampu TL Balk EM 36 Watt Bh Rp.
14 Lampu LED 7 watt Bh Rp.
15 Lampu LED 7 watt c/w battery charger Bh Rp.
16 Lampu Downlight 13 watt Bh Rp.
17 Lampu Downlight 18 watt Bh Rp.
18 Lampu Taman SL-26 watt Bh Rp.
19 Lampu Exit 18 watt + Battery Bh Rp.
Tap off 2 way Bh Rp.
20 Isolator Bh Rp.
21 Las Doof Bh Rp.
22 Fiting Plafond Bh Rp.
23 T dos PVC Bh Rp.
24 Stop Kontak Wall Type Bh Rp.
25 Stop Kontak Floor Type Bh Rp.
26 Stop Kontak-AC Bh Rp.
27 Stop Kontak-TV Bh Rp.
28 Stop Kontak-TELEPON Bh Rp.
29 Saklar tunggal Bh Rp.
30 Sakla ganda Bh Rp.
31 Saklar Hotel 1 gang Bh Rp.
32 Saklar Hotel 2 gang Bh Rp.
33 Kabel NYA 1000 Volt 1,5 mm M1 Rp.
34 Kabel NYA 1000 Volt 2x1,5 mm M1 Rp.
35 Kabel NYA 1000 Volt 3x1,5 mm M1 Rp.
Kabel NYA 1000 Volt 3x2,5 mm M1 Rp.
36 Kabel NYA 1000 Volt 2,5 mm M1 Rp.
37 Kabel NYA 1000 Volt 2x2,5 mm M1 Rp.
38 Kabel NYA 1000 Volt 4 mm M1 Rp.
39 Kabel NYA 1000 Volt 6 mm M1 Rp.
40 Kabel NYA 1000 Volt 10 mm M1 Rp.
41 Kabel NYA 1000 Volt 16 mm M1 Rp.
42 Kabel NYA 1000 Volt 25 mm M1 Rp.
43 Kabel NYA 1000 Volt 35 mm M1 Rp.
44 Kabel NYA 1000 Volt 50 mm M1 Rp.
45 Kabel NYA 1000 Volt 70 mm M1 Rp.
46 Kabel NYA 1000 Volt 95 mm M1 Rp.
47 Kabel NYA 1000 Volt 120 mm M1 Rp.
48 Kabel NYA 1000 Volt 150 mm M1 Rp.
49 Kabel NYA 1000 Volt 185 mm M1 Rp.
50 Kabel NYM 300/750 Volt 3x2,5 mm2 M1 Rp.
51 Kabel NYM 300/750 Volt 3x4 mm2 M2 Rp.
Kabel NYY 0,6/1 Kv 2x1,5 mm2 M1 Rp.
Kabel NYY 0,6/1 Kv 2x2,5 mm2 M1 Rp.
52 Kabel NYY 0,6/1 Kv 3x2,5 mm2 M1 Rp.
53 Kabel NYY 0,6/1 Kv 4x2,5 mm2 M1 Rp.
54 Kabel NYY 0,6/1 Kv 4x4 mm2 M1 Rp.
55 Kabel NYY 0,6/1 Kv 4x6 mm2 M1 Rp.
56 Kabel NYY 0,6/1 Kv 4x10 mm2 M1 Rp.
57 Kabel NYY 0,6/1 Kv 4x16 mm2 M1 Rp.
58 Kabel NYY 0,6/1 Kv 4x25 mm2 M1 Rp.
59 Kabel NYY 0,6/1 Kv 4x35 mm2 M1 Rp.
60 Kabel NYY 0,6/1 Kv 4x50 mm2 M1 Rp.
61 Kabel NYY 0,6/1 Kv 4x70 mm2 M1 Rp.
62 Kabel NYY 0,6/1 Kv 4x95 mm2 M1 Rp.
63 Kabel NYY 0,6/1 Kv 4x120 mm2 M1 Rp.
64 Kabel NYY 0,6/1 Kv 4x150 mm2 M1 Rp.
65 Kabel NYY 0,6/1 Kv 4x185 mm2 M1 Rp.
66 Kabel NYY 0,6/1 Kv 4x240 mm2 M1 Rp.
67 Kabel NYY 0,6/1 Kv 4x300 mm2 M1 Rp.
Kabel NYY 0,8/1 Kv 1x120 mm2 M1 Rp.
Kabel NYY 0,8/1 Kv 1x240 mm2 M1 Rp.
NYMHY 2 x 1,5 mm2 M1 Rp.

68 Kabel NYFGBY 0,6/1 Kv 3x2,5 mm2 M1 Rp.


69 Kabel NYFGBY 0,6/1 Kv 4x240 mm2 M1 Rp.
Kabel FRC 0,6/1 Kv 1x1,5 mm2 M1 Rp.
Kabel FRC 0,6/1 Kv 1x2,5 mm2 M1 Rp.
Kabel FRC 0,6/1 Kv 3x2,5 mm2 M1 Rp.
70 Kabel FRC 0,6/1 Kv 3x2,5 mm2 M1 Rp.
71 Kabel FRC 0,6/1 Kv 4Cx4 mm2 M1 Rp.
72 Kabel FRC 0,6/1 Kv 4Cx6 mm2 M1 Rp.
Kabel FRC 0,6/1 Kv 4Cx10 mm2 M1 Rp.
Kabel FRC STP AWG 16 1 pair M1 Rp.
73 Kabel Coaxial 7C-2V M1 Rp.
74 Kabel Coaxial 5C-2V M1 Rp.
75 Kabel ITC 4x0,6 mm2 M1 Rp.
Kabel Power N2XSEBY 3 x 120 mm² M1 Rp.
Kabel BC 120 mm M1 Rp.
Kabel BC 10 mm M1 Rp.
76 Pipa Konduit HI dia.20 mm M1 Rp.
77 Tray W=200 mm M1 Rp.
78 TEE W=200 mm M1 Rp.
79 Elbow W=200 mm M1 Rp.
80 Heat detector BH Rp.
81 Smoke detector BH Rp.
82 Manual push button BH Rp.
83 Bell alarm BH Rp.
84 Lampu indikator BH Rp.
85 End of Line Resistor BH Rp.
86 MCFA-10 Zone BH Rp.
87 terminal Fire alarm BH Rp.
88 Terminal -TV BH Rp.
89 Antena UHF,10 element BH Rp.
90 Antena VHF,10 element BH Rp.
91 Master Amplifier BH Rp.
92 Arester Lightning Protection R=50 M BH Rp.
93 Sekrering Tunggal "LN" biasa Bh Rp.
94 Sekering ganda "LN" biasa Bh Rp.
95 Sekering 1 group + MCB Unit Rp.
96 Sekering 2 group + MCB Unit Rp.
97 Sekering 3 group + MCB Unit Rp.
98 Kwh/1phase Digital Unit Rp.
99 Kwh/3 phase/63 A Digital Unit Rp.
100 MCB,1ph/6/10/16/25 amper Unit Rp.
101 Box panel Hanger Unit Rp.
102 Grounding box 40x40x40cm Unit Rp.
103 Grounding Rod,1" Unit Rp.
104 Termination ls Rp.
105 BC 50 mm2 M1 Rp.
106 Genset 25 kva Silent type Unit Rp.
107 Box Telepon Unit Rp.
108 Jelly armoured 10x2x0,6 mm M1 Rp.
109 Splitter 6 port bh Rp.
110 MDF-FA ( 10 zone ) bh Rp.
Ceiling Speaker bh Rp.
Wall Speaker bh Rp.
111 Rectifier bh Rp.
112 Power Surge Arrester bh Rp.
113 Battery & Charger bh Rp.
114 Kabel NYA 1000 Volt 6x1,5 mm M1 Rp.
115 Kabel NYA 1000 Volt 20x1,5 mm M1 Rp.
116 Pipa Konduit HI dia.32 mm M1 Rp.
120 Box Panel bh Rp.
121 Cu bar ex,japan unit Rp.
Tray W=300 mm M1 Rp.
Elbow W=300 mm BH Rp.
122 Tray W=400 mm M1 Rp.
123 TEE W=400 mm bh Rp.
124 Elbow W=400 mm bh Rp.
125 Reduser W=400 mm bh Rp.
126 Tray W=900 mm M1 Rp.
127 Tray W=600 mm M1 Rp.
128 Lampu HPI-T 250 W NR 921 Bh Rp.
Lampu DL SL 13 Watt Bh Rp.
Lampu DL LED 7 Watt Bh Rp.
Lampu DL EM 7 Watt Bh Rp.
Remote Lamp Bh Rp.
129 Kabel NYY 0,6/1 Kv 3x2,5 mm2 M1 Rp.
130 Dome Camera P/T/Z WV - CS 570 unit Rp.
131 Hard disk Recording 16 Ch (Kap 3 tera) unit Rp.
STP AWG 1 Pair M1 Rp.
132 Kabel NYY 0,6/1 Kv 4x240 mm2 M1 Rp.
133 Pipa Gip dia.65 mm M1 Rp.
134 Ladder W=200 mm M1 Rp.
135 Ladder TEE W=200 mm M1 Rp.
136 Testing & Commissioning ls Rp.
137 Biaya pasang baru daya listrik PLN va Rp.
138 Panel SDP bh Rp.
139 Panel MDP bh Rp.
140 Panel DB Pengelola bh Rp.
141 Panel DP Lt Dasar bh Rp.
142 Panel DP-EMG bh Rp.
Panel DP PL bh Rp.
Panel PB Lt Atap bh Rp.
Panel PB Lif P1 bh Rp.
Panel Pompa Booster bh Rp.
Panel P EMG Atap bh Rp.
Panel PB TK1 bh Rp.
Panel PUTR bh Rp.
Panel PUTM bh Rp.
143 PP-Unit lt 1 bh Rp.
144 PP-Unit lt 2,3,4 bh Rp.
145 Panel Pompa Hydrant bh Rp.
146 Panel Pompa Air Bersih bh Rp.
147 Panel Unit bh Rp.
Kapasitor Bank bh Rp.
158 Tiang Lampu 2.5 m bh Rp.
Conduit Pipa dia 20 mm M1 Rp.
Split penyalur petir non radio aktif radius R unit Rp.
Tiang pipa dia 65 = 5 meter + acessories unit Rp.
Down Conduktor BC 50mm + accessories m' Rp.
Grounding System max. 3 ohm lot Rp.
Lampu 26 Watt bh Rp.
Testing & Comissioning included perijinan lot Rp.
Biaya Instalasi lot Rp.
Material Bantu lot Rp.
Bracket, Seal , Test Box , dls lot Rp.

Inverter 220V/50 Hz unit Rp.


Modulator unit Rp.
Divider unit Rp.
Booster Amplifier unit Rp.
TV Monitor Test Point unit Rp.
Head End CATV unit Rp.
Main Booster unit Rp.
Main Splitter unit Rp.

Jack intercom unit Rp.


Master interkom unit Rp.
UPS 2 KVA unit Rp.
Announciator unit Rp.
Tamper switch bh Rp.
Flow switch bh Rp.

Selector 20 zone unit Rp.


Power Amplier 240 Watt unit Rp.
UPS 1 KVA unit Rp.
Mixer unit Rp.
MP3 DVD/CD/CDR unit Rp.
Sirine module unit Rp.
Pre Amplifier 120 Watt unit Rp.
Microphone control unit Rp.

DVR 2 x 16 Port unit Rp.


LED Monitor 32" unit Rp.

Fixed dome camera bh Rp.

PENYAMBUNGAN DAYA PLN VA Rp.


Transformator 315 KVA unit Rp.
Vending system unit Rp.
KWH Meter Prabayar 1 Ph unit Rp.
Genset unit Rp.
Instalasi Genset unit Rp.

FRC 4 x 185 mm2 + BC 70 mm2 m Rp.


FRC 4 x 4 mm2 + BC 4 mm2 m Rp.

Pressurized Fan 10.000 Cfm unit Rp.

Kabel NYM 3 x 2,5 mm² + conduit 20 mm m Rp.

Lampu taman HPL - N 2 x 80W Tiang 6 - 12 unit Rp.

Pressurized Fan 480 Cfm unit Rp.


Pressurized Fan 690 Cfm unit Rp.

Pengadaan dan Pemasangan Access Control Lift


Lift Controller Buah Rp.
Expantion lift controller Buah Rp.
Wiegand Reader With Proximity Buah Rp.
PSU Set Buah Rp.
Lisence-Soft-WEB- Each Lift Buah Rp.
PC Server Buah Rp.
Proximity Card Buah Rp.

Instalasi Kabel dan Conduit


Kabel UTP CAT 6 M' Rp.
Pipa Conduit 20mm M' Rp.
Kabel AWG 18 M' Rp.
Switch Hub 8 port M' Rp.
Pipa Conduit 20mm M' Rp.
Kabel Power NYM 2x2.5mm M' Rp.

Transportasi Akomodasi Keamanan dan Kes lot Rp.


Pekerjaan perapihan lot Rp.
Material & alat bantu lot Rp.
Testing & Comissioning instalasi lot Rp.

Anda mungkin juga menyukai