A.3. LANTAI 5
1. PEMIPAAN AIR BERSIH -
Page 1 of 309
REKAPITULASI
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
A.4. LANTAI 6
1. PEMIPAAN AIR BERSIH -
2. PEMIPAAN AIR PANAS -
3. PEMIPAAN AIR KOTOR & AIR BEKAS -
4. PEMIPAAN AIR HUJAN -
5. PEMIPAAN VENT -
6. INSTALASI PANEL -
7. INSTALASI KABEL FEEDER -
8. INSTALASI KABEL TRAY -
9. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK -
Page 2 of 309
REKAPITULASI
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
Page 3 of 309
REKAPITULASI
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
SUB TOTA
Page 4 of 309
EKAPITULASI
OF QUANTITY (BOQ)
MEKANIKAL & ELEKTRIKAL
JUMLAH HARGA
IAN PEKERJAAN
(Rp.)
Page 5 of 309
EKAPITULASI
OF QUANTITY (BOQ)
MEKANIKAL & ELEKTRIKAL
JUMLAH HARGA
IAN PEKERJAAN
(Rp.)
Page 6 of 309
EKAPITULASI
OF QUANTITY (BOQ)
MEKANIKAL & ELEKTRIKAL
JUMLAH HARGA
IAN PEKERJAAN
(Rp.)
-
-
Page 7 of 309
EKAPITULASI
OF QUANTITY (BOQ)
MEKANIKAL & ELEKTRIKAL
JUMLAH HARGA
IAN PEKERJAAN
(Rp.)
SUB TOTAL : -
Page 8 of 309
REKAPITULASI
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
5. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
- Dia. 25
6. INSTALASI PANEL
Pengadaan dan pemasangan SDP-LT.1
dengan komponen panel, sbb :
- MCCB 3P, 300 A
- MCCB 3P, 63 A
- MCCB 3P, 50 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 3 x 2 A
- Indicator Lamp
- Rel MCB 3P
- CT 300A/50A
- Cu Bar 4 x (30 x 5)mm2 + 1 x (15x5) mm2
- Accessories & Termination
- Box Panel
5. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
- Dia. 25
6. INSTALASI PANEL
Pengadaan dan pemasangan DP-LT.2 s/d 4
dengan komponen panel, sbb :
- MCCB 3P, 50 A
- MCB 3P, 20 A
- MCB 1P, 16 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 3 x 2 A
- Indicator Lamp
- Rel MCB 3P
- CT 50A/5A
- Cu Bar 5 x (12x 2)mm2
- Cu Bar 4 x (12x 2)mm2 + 1 x (12x2) mm2
- Accessories & Termination
- Box Panel
- Lampu DL SL 13 Watt
- Lampu DL LED 7 Watt
- Lampu Baret 10 Watt
- Stop Kontak 200 watt
- Stop Kontak AC 375 watt
- Saklar 1 gang
- Saklar 2 gang
A.3. LANTAI 5
5. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
- Dia. 25
6. INSTALASI PANEL
Pengadaan dan pemasangan DP-LT.5
dengan komponen panel, sbb :
- MCCB 3P, 50 A
- MCB 3P, 20 A
- MCB 1P, 16 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 3 x 2 A
- Indicator Lamp
- Rel MCB 3P
- CT 50A/5A
- Cu Bar 5 x (12x 2)mm2
- Cu Bar 4 x (12x 2)mm2 + 1 x (12x2) mm2
- Accessories & Termination
- Box Panel
- Lampu DL SL 13 Watt
- Lampu DL LED 7 Watt
- Lampu Baret 10 Watt
- Stop Kontak 200 watt
- Stop Kontak AC 375 watt
- Saklar 1 gang
- Saklar 2 gang
A.4. LANTAI 6
5. PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80
- Dia. 100
- Dia. 80 ( pipa riser )
- Dia. 25
6. INSTALASI PANEL
Pengadaan dan pemasangan DP-LT.6
dengan komponen panel, sbb :
- MCCB 3P, 50 A
- MCB 3P, 20 A
- MCB 1P, 16 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 3 x 2 A
- Indicator Lamp
- Rel MCB 3P
- CT 50A/5A
- Cu Bar 5 x (12x 2)mm2
- Cu Bar 4 x (12x 2)mm2 + 1 x (12x2) mm2
- Accessories & Termination
- Box Panel
- Lampu DL SL 13 Watt
- Lampu DL LED 7 Watt
- Lampu Baret 10 Watt
- Stop Kontak 200 watt
- Stop Kontak AC 375 watt
- Saklar 1 gang
- Saklar 2 gang
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- BV dia. 50
- GV dia. 100
- GV dia. 50
- CV dia. 50
- FJ dia. 50
- WLC + Panel
- Pressure Indikator (PI)
3. INSTALASI PANEL
a. DP-LT.Atap
Pengadaan dan pemasangan DP-LT.Atap
b. PB-LT.Atap
Pengadaan dan pemasangan PB-LT.Atap
c. PB-Lift.P1
Pengadaan dan pemasangan PB-Lift.P1
d. P-Booster
Pengadaan dan pemasangan PB-Booster
e. P-EMG Atap
Pengadaan dan pemasangan PP-EMG Atap
f. PB-TK.1
Pengadaan dan pemasangan PB-TK.1
g. PB-PF.1
Pengadaan dan pemasangan PB-PF.1
h. PK-LS
Pengadaan dan pemasangan PK-LS
1. INSTALASI PANEL
a. P-PLN
- MCCB 3P, 300 A : 1 bh
- Accessories & Termination : 1 lot
- Box Panel : 1 unit
b. PUTR
Pengadaan dan pemasangan PUTR
b. Lampu Taman
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt
b. Lampu Taman
- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman
1. INSTALASI
Pentanahan (Grounding) Netral Sistem & Pentanahan Body
a. - Body Panel
Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm )
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material
- Kabel BC 70 mm2
- Testing & Commissioning
1. INSTALASI
- Split penyalur petir non radio aktif radius R-80 meter
- Tiang pipa dia 65 = 5 meter + acessories
- Down Conduktor BC 50mm + accessories
- Grounding System max. 3 ohm
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Biaya Instalasi
- Material Bantu
- Testing & Comissioning included perijinan dari DEPNAKER
- Bracket, Seal , Test Box , dls
HARGA SATUAN TOTAL HARGA
SAT VOL
(Rp) (Rp)
m 153.40 - -
m 140.04 - -
m 45.52 - -
m 32.00 - -
m 4.00 - -
bh 8.00 - -
bh 8.00 - -
bh 8.00 - -
m 54.66 - -
bh 8.00 - -
bh 8.00 - -
-
`
m 10.65 - -
m 46.24 - -
m 29.48 - -
m 10.40 - -
m 38.06 - -
m 34.74 - -
m 18.40 - -
m 23.05 - -
m 22.12 - -
m 32.00 - -
m 32.00 - -
bh 2.00 - -
bh 8.00 - -
m 107.86 - -
m 71.18 - -
m 15.17 - -
m 32.00 - -
m 171.64 - -
-
unit 1.00 - -
unit 1.00 - -
unit 1.00 - -
unit 1.00 - -
unit 8.00 - -
m 35.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
-
m 58.92 - -
m 58.75 - -
bh 4.00 - -
lot 1.00 - -
-
bh 3.00 - -
bh 6.00 - -
bh 6.00 - -
bh 11.00 - -
bh 31.00 - -
bh 8.00 - -
bh 18.00 - -
bh 3.00 - -
bh 11.00 - -
bh 12.00 - -
bh 40.00 - -
bh 16.00 - -
bh 8.00 - -
bh 72.00 - -
bh 24.00 - -
bh 32.00 - -
bh 16.00 - -
-
titik 147.00 - -
titik 99.00 - -
m 451.73 - -
m 583.20 - -
m 183.92 - -
m 144.00 - -
bh 36.00 - -
bh 36.00 - -
bh 36.00 - -
m 245.95 - -
bh 36.00 - -
bh 36.00 - -
m 112.91 - -
m 104.94 - -
m 103.72 - -
m 99.54 - -
m 144.00 - -
m 144.00 - -
bh 2.00 - -
bh 2.00 - -
bh 36.00 - -
-
m 144.00 - -
m 45.50 - -
m 144.00 - -
m 694.80 - -
-
unit 3.00 - -
unit 36.00 - -
m 105.00 - -
m 45.00 - -
m 60.00 - -
m 75.00 - -
m 90.00 - -
m 105.00 - -
m 120.00 - -
m 45.00 - -
m 60.00 - -
m 75.00 - -
m 90.00 - -
m 105.00 - -
m 120.00 - -
-
m 176.75 - -
m 176.24 - -
bh 12.00 - -
lot 3.00 - -
-
bh 18.00 - -
bh 15.00 - -
bh 42.00 - -
bh 30.00 - -
bh 12.00 - -
bh 18.00 - -
bh 6.00 - -
-
bh 180.00 - -
bh 72.00 - -
bh 36.00 - -
bh 324.00 - -
bh 108.00 - -
bh 144.00 - -
bh 72.00 - -
-
titik 393.00 - -
titik 444.00 - -
m 150.58 - -
m 194.40 - -
m 61.31 - -
m 48.00 - -
m 30.31 - -
m 53.67 - -
m 8.00 - -
bh 12.00 - -
bh 12.00 - -
bh 12.00 - -
m 81.98 - -
bh 12.00 - -
bh 12.00 - -
m 30.64 - -
m 27.60 - -
m 34.57 - -
m 33.18 - -
m 48.00 - -
m 48.00 - -
bh 12.00 - -
m 48.00 - -
m 15.17 - -
m 48.00 - -
m 231.60 - -
-
unit 1.00 - -
unit 12.00 - -
m 35.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 35.00 - -
m 40.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 35.00 - -
m 40.00 - -
-
m 58.92 - -
m 58.75 - -
bh 4.00 - -
lot 1.00 - -
-
bh 6.00 - -
bh 5.00 - -
bh 14.00 - -
bh 10.00 - -
bh 4.00 - -
bh 6.00 - -
bh 2.00 - -
bh 60.00 - -
bh 24.00 - -
bh 12.00 - -
bh 108.00 - -
bh 36.00 - -
bh 48.00 - -
bh 24.00 - -
-
titik 131.00 - -
titik 148.00 - -
m 150.58 - -
m 194.40 - -
m 61.31 - -
m 48.00 - -
m 28.92 - -
m 9.86 - -
m 22.16 - -
m 14.86 - -
m 8.00 - -
bh 12.00 - -
bh 12.00 - -
bh 12.00 - -
m 81.98 - -
bh 12.00 - -
bh 12.00 - -
m 30.64 - -
m 27.60 - -
m 34.57 - -
m 33.18 - -
m 48.00 - -
m 48.00 - -
-
bh 12.00 - -
m 48.00 - -
m 15.17 - -
m 27.68 - -
m 32.04 - -
m 48.00 - -
m 231.60 - -
-
unit 1.00 - -
unit 12.00 - -
m 35.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 35.00 - -
m 40.00 - -
m 15.00 - -
m 20.00 - -
m 25.00 - -
m 30.00 - -
m 35.00 - -
m 40.00 - -
-
m 58.92 - -
m 58.75 - -
bh 4.00 - -
lot 1.00 - -
-
bh 6.00 - -
bh 5.00 - -
bh 14.00 - -
bh 10.00 - -
bh 4.00 - -
bh 6.00 - -
bh 2.00 - -
-
bh 60.00 - -
bh 24.00 - -
bh 12.00 - -
bh 108.00 - -
bh 36.00 - -
bh 48.00 - -
bh 24.00 - -
-
titik 131.00 - -
titik 148.00 - -
m 40.00 - -
m 25.00 - -
m 6.00 - -
m 2.75 - -
bh 2.00 - -
bh 2.00 - -
bh 4.00 - -
bh 2.00 - -
bh 2.00 - -
set 1.00 - -
set 1.00 - -
bh 12.00 - -
-
unit 1.00 - -
unit 1.00 - -
unit 1.00 - -
unit 1.00 - -
unit 1.00 - -
unit 1.00 - -
unit 1.00 - -
unit 1.00 - -
unit 12.00 - -
titik 12.00 - -
unit 1.00 - -
unit 1.00 - -
-
m 30.00 - -
m 25.00 - -
m 30.00 - -
m 25.00 - -
m 25.00 - -
m 25.00 - -
m 25.00 - -
m 44.00 - -
m 54.00 - -
m 64.00 - -
m 74.00 - -
m 84.00 - -
m 94.00 - -
m 104.00 - -
m 25.00 - -
m 25.00 - -
-
bh 2.00 - -
bh 1.00 - -
bh 2.00 - -
bh 16.00 - -
ttk 2.00 - -
ttk 1.00 - -
ttk 16.00 - -
lot 1.00 - -
bh 1.00 - -
lot 1.00 - -
m 30.00 - -
lot 1.00 - -
bh 1.00 - -
lot 1.00 - -
m 30.00 - -
lot 1.00 - -
unit 1.00 - -
unit 2.00 - -
m' 102.00 - -
lot 2.00 - -
lot 1.00 - -
lot 1.00 - -
lot 1.00 - -
lot 1.00 - -
REKAPITULASI
BILL OF QUANTITY ( BOQ )
PEKERJAAN MEKANIKAL & ELEKTRIKAL
1. PEMIPAAN HYDRANT
RUANG POMPA
Pipa Sch 40 (Incl. Fitting & Accessories)
- Sch 40 dia. 250 : Header
- Sch 40 dia. 250 : Header
- Sch 40 dia. 200 :
- Sch 40 dia. 150 :
- Sch 40 dia. 100 :
- Sch 40 dia. 80 : Exhaust c/w isolasi
- Sch 40 dia. 65 : JFP
- Sch 40 dia. 50 : Drain
- Sch 40 dia. 32 : Tanki Dailly
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- GV dia. 200
- GV dia. 150
- GV dia. 100
- GV dia. 65
- GV dia. 50
- GV dia. 32
- ST dia. 150
- ST dia. 65
- ST dia. 32
- FJ dia. 150
- FJ dia. 65
- FJ dia. 32
- FM dia. 150
- MCV dia. 150 + Alarn Gong
- SRV dia. 100
- Anti vortex tyco
- Pressure Indikator
- Air Vent (AV)
SPRINKLE
- Sch 40 dia. 150
- Sch 40 dia. 100
- Sch 40 dia. 80
- Sch 40 dia. 65
- Sch 40 dia. 50
- Sch 40 dia. 40
- Sch 40 dia. 40 (Riser)
- Sch 40 dia. 32
- Sch 40 dia. 25
- Sch 40 dia. 25 (Drain)
Peralatan Katup-katup
- GV dia. 25
- PRV dia. 40
- TDV dia. 40
- Sprinkle : Pendant
- Fire Extingusher 3 kg
B.1.2 LANTAI 2 S/D 6
SPRINKLE
- Sch 40 dia. 150
- Sch 40 dia. 100
- Sch 40 dia. 80
- Sch 40 dia. 65
- Sch 40 dia. 50
- Sch 40 dia. 40
- Sch 40 dia. 40 (Riser)
- Sch 40 dia. 32
- Sch 40 dia. 25
- Sch 40 dia. 25 (Drain)
Peralatan Katup-katup
- GV dia. 25
- PRV dia. 40
- TDV dia. 40
- Sprinkle : Pendant
- Fire Extingusher 3 kg
I PEKERJAAN MATV
a PERALATAN UTAMA MATV
Inverter 220V/50 Hz
Active Combiner / Mixer
Modulator
Divider
Antenna UHF
Antenna TVRI VHF
Booster Amplifier
TV Monitor Test Point
Head End CATV
Main Booster
Main Splitter
b INSTALASI KABEL FEEDER MATV
c PERALATAN MATV
Lantai Dasar
- Splitter 4 Ways
- Tap off 2 Ways
- TV outlet
Lantai 2 s/d 6
- Splitter 4 Ways
- Tap off 2 Ways
- TV outlet
Lantai Dasar
- JBFA
- Photo elektrik smoke detektor
- Rate of rise heat detektor
- Remote lamp
- Manual push button
- Alarm bell
- Flasher lamp
- Jack interkom
- Tamper switch
- Flow switch
Lantai 2 s/d 6
- JBFA
- Photo elektrik smoke detektor
- Rate of rise heat detektor
- Remote lamp
- Manual push button
- Alarm bell
- Flasher lamp
- Jack interkom
- Tamper switch
- Flow switch
MDF - TS
Selector 20 zone
Power Amplier 240 Watt
UPS 1 KVA
Mixer
MP3 DVD/CD/CDR
Sirine module
Pre Amplifier 120 Watt
Microphone control
Surge Arrester
b INSTALASI KABEL FEEDER TATA SUARA
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari MDF-TS ke Selector 20 zone
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Selektor 20 zone ke power amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke mixer
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke UPS
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke Pre amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Pre amplifier ke Microphone control
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke Pre amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke MP3 DVD dan Sirene Module
Lantai Dasar
- JBTS
- Ceilling speaker 3W
- Wall speaker 3W
Lantai 2 s/d 6
- JBTS
- Ceilling speaker 3W
IV PEKERJAAN CCTV
a PERALATAN UTAMA CCTV
DVR 2 x 16 Port
UPS dengan back up battery
LED Monitor 32"
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari MDF-TS ke Selector 20 zone
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Selektor 20 zone ke power amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke mixer
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke UPS
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke Pre amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Pre amplifier ke Microphone control
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke Pre amplifier
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke MP3 DVD dan Sirene Module
Lantai Dasar
- Fixed dome camera
Lantai 2 s/d 6
- Fixed dome camera
2 Booster Pump
Type : Packaged Booster Pump
Kapasitas : 2 x 150 lpm / 3 Bar
Head : 20 mtr
Speed : 1450 rpm
Daya : 1,5 KW
Operasi : 2 Parallel Alternate
( lengkap dengan Pump & Electromotor, Pressure Tank, Panel Kontrol, Pressure switch,
Presure Gauge, Accessories, Gate Valve, Header & base Plat )
4 Deep Well
Lokasi : -
Type : Submersible multistage
Kapasitas : 9 m³/jam
Head : -
Tekanan : 10 bar
Daya : 5,3 kW / 380V / 3 Ph / 50Hz.
Putaran : 2.900 Rpm
Motor : Included Pompa
Kedalaman : ± 150 meter
Operasi : Automatic by LS (ON - OFF)
Material pump
- Casing : Cast iron / standard temperature
- Impeller : Stainless Steel
- Shaft : Stainless Steel
Pekerjaan termasuk :
- Panel Control lengkap dengan pengkabelan, NYY 4 x 4 mm2 + BC 4 mm2
- Water Level Control pada GWT
- Pengeboran dengan kedalaman minimal 200 meter
- Casing, pipa-pipa, Valve, meter air, bak kontrol, dll.
- Perijinan
- Kelengkapan lain sesuai dengan spesifikasi teknis & gambar perencanaan.
7 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
a SITE PLAN
1. Dari Box Meter PDAM ke GWT
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT)
2. Pemipaan R.Pompa ke Tanki Air Atas
- GIP dia. 50
2 Resapan
Kapasitas : 5 m3
3 TESTING COMMISSIONING
PUTM
Pengadaan dan pemasangan PUTM
Genset
Pengadaan dan pemasangan Genset
(250 KVA, 1500 RPM, 380/220V, 3P + N, 50 Hz, Prime)
Instalasi Genset
- Setting dan levelling unit genset ke atas pondasi
lengkap dengan pemasangan angkur & alat bantu
- Grounding system
Pemipaan knalpot lengkap dengan jacketing rockwool
Tangki harian kap. 200 Ltr
Pemipaan bahan bakar
Residential Silencer
Kabel Trench
Testing Commisioning
Dari SDP-Hydrant ke :
Pekerjaan termasuk clamb, support, cable ladder, hanger
dan perlengkapan lainnya.
Panel Control Electric Fire Pump (PC-EFP):
Kabel : FRC 4 x 185 mm2 + BC 70 mm2
Panel Control Jockey Fire Pump (PC-JFP):
Kabel : FRC 4 x 4 mm2 + BC 4 mm2
Pressurized Fan
Type : Centrifugal
Kapasitas : 480 Cfm
Daya : + .........
Operasi : Automatic ON-OFF
Pressurized Fan
Type : Centrifugal
Kapasitas : 690 Cfm
Daya : + .......
Operasi : Automatic ON-OFF
V PEKERJAAN GONDOLA
2 HOIST TAKAHASHI YJ - 99
Position : on platform
Quantity : 2 unit untuk setiap sangkar
SWL : 630 kg/unit
Lifting speed : 8 - 10 m/min
Power consumption : 3PH/380V/50Hz/1 HP
Self weight : 45 kg/unit
Safety : Slack rope safety device
Power failure Breake release
3 WIRE WINDER
Material : Galvanized steel plat 1,5 mm
Motor penggerak : 0,5 HP
4 PANEL CONTROL
Type : Type wheather proof (IP 65)
Tebal plat : 2mm, Busbar Cu tin plating
Finishing Box : Powder coating anti karat
Lengkap dengan MCCB, MCB, busbar, metering, relay, dan aksesories lainya sesuai gambar
dan spesifikasi teknis
5 WIRE ROPE
Diameter : 8,2 mm (disesuaikan denga tinggi bangunan)
Main rope leght : 6 x 19 IWRC ) 2 x 30 m
Safety rope leght : 6 x 19 IWRC ) 2 x 30 m
Type of wire rope : IWRC Galvanized
B. Strenght : 4300 kg
6 KABEL ELECTRIC
Structure : 5 x 2,5 mm2 (1 x 75 m)
Type : NYYHY / Flexicore
VI PEKERJAAN LIFT
Pasangger Lift
Data Lift :
Lift Designation/s : LP-01
Lift Type : Passengger elevator
Machine Room Location : Machine Room
Load : 1000 kg
Max. No. of Passengers : 15 person
Speed : 1,5 m/s
Travel : 14,4 m
Overtravel : 4800 mm
Pit Depth : 1800 mm
Shaft Size (W x D) : 1800 x 1930 mm
Machine Room Height :
Number of Floors :6
Car Entrances :1
Number of Stops / Entrances : 6 / 6F
Floor Designations/s
Front : GF, 1,2,3,5,6
Rear :-
Side :-
Emergency Exit :-
Drive Data :
Drive System : ACVVVF Gearless
Main Power Supply / Frequenc: 380 V/ 50 Hz
Lighting Power Supply / Frequ : 220 V/ 50 Hz
Power Requirement : TBA KW
Electrical Data :
Control Mode : Collective Selective
Group Size :2
Layout Type : Inline
COP Button Type : Linea 100
COP Number / Location : 2 / Front
COP Indicator Type : Linea 100
COP Faceplate : HLSS
No. of Risers
Main Floor :1
Other Floor :1
LOP Button Type : Linea 100
LOP Faceplate
Main Floor : HLSS
Other Floor : HLSS
LIP (Indicator) Type
Main Floor : Linea 100 (Above Door)
Other Floor : Linea 100 (Combined w/ LOP)
LIP (Indicator) Faceplate
Main Floor : HLSS
Other Floor : HLSS
Landing Door :
Door Type : 2-Panel Center Opening
Landing Door Size (W x H) : 800 x 2100
Door Panel Finish
Main Floor : HLSS
Other Floor : HLSS
Frame Type
Main Floor : Box Frame 50x50
Other Floor : Box Frame 50x50
Door Frame Finish
Main Floor : HLSS
Other Floor : HLSS
Door Sill : Aluminum
Car :
Car Door Type : 2-Panel Center Opening
Car Size (W x D x H) : 1350 x 1400 x 2500mm
Car Clear Height : 2400 mm
Car Door Size (W x H) : 800 x 2100 mm
Car Door Safety : Light Curtain
Car Door Finish : HLSS
Car Door Sill : Aluminum
Car Decoration Line : Times Square 2.0
Front Wall Type : Expression
Front Wall Deco. : HLSS
Side Wall Deco. : HLSS
Rear Wall Deco. : HLSS
Mirror : Not Provided
Handrail : Not Provided
Floor Deco. & Recess : Granite
Ceiling Deco. : Squares
Max. Add. Deco. Weight :-
Counterweight :
C/W Location in Shaft : Side
C/W Safety Gear : Not Provided
Accessible Space Below Pit : No
Other Requirements :
Air Conditioner in Car : Not Provided
Attendant Control : Standard
Automatic Rescue Device (ARD: Provided
Car Call Cancelling : Provided
Card Reader Interface : Provided
CCTV Interface : Provided
Earthquake Control Interface : Provided
Emergency Backup for Light & : Provided
Emergency Exit (Blind Zone) : Not provided
Emergency Power Control : Standard
Fireman Control : BR1 (Fire Homing)
Hall Lantern on Landing : Not Provided
Independent Control w/ Parkin : Provided
Intercom : 3-way (Car-MR-Control)
Multimedia LCD Display : Not Provided
Out of Service Control : Standard
PORT System : Not Provided
Pre-Arrival Gong : On Car
Supervisory Panel : CRT Monitoring
Voice Synthesizer : Not Provided
Other Special Requirements / C: -
Service/Fireman's Lift
Data Lift :
Lift Designation/s : LS/F-01
Lift Type : Service/Fireman's Lift
Machine Room Location : Machine Room
Load : 1000 kg
Max. No. of Passengers : 15 person
Speed : 1 m/s
Travel : 21,2 m
Overtravel : 4600 mm
Pit Depth : 1500 mm
Shaft Size (W x D) : 2300 x 2850 mm
Machine Room Height :
Number of Floors :8
Car Entrances :1
Number of Stops / Entrances : 8 / 8F
Floor Designations/s
Front : GF, 1,2,3,5,6,7,8
Rear :-
Side :-
Emergency Exit :-
Drive Data :
Drive System : ACVVVF PM Gearless
Main Power Supply / Frequenc: 380 V/ 50 Hz
Lighting Power Supply / Frequ : 220 V/ 50 Hz
Power Requirement : TBA KW
Electrical Data :
Control Mode : Collective Selective
Group Size :2
Layout Type : Inline
COP Button Type : Linea 100
COP Number / Location : 2 / Side
COP Indicator Type : Linea 100
COP Faceplate : HLSS
No. of Risers
Main Floor :1
Other Floor :1
LOP Button Type : Linea 100
LOP Faceplate
Main Floor : HLSS
Other Floor : HLSS
LIP (Indicator) Type
Main Floor : Linea 100 (Above Door)
Other Floor : Linea 100 (Combined w/ LOP)
LIP (Indicator) Faceplate
Main Floor : HLSS
Other Floor : HLSS
Landing Door :
Door Type : 2-Panel Side Opening
Landing Door Size (W x H) : 1200 x 2100
Door Panel Finish
Main Floor : HLSS
Other Floor : HLSS
Frame Type
Main Floor : Box Frame 50x50
Other Floor : Box Frame 50x50
Door Frame Finish
Main Floor : HLSS
Other Floor : HLSS
Door Sill : Aluminum
Car :
Car Door Type : 2-Panel Side Opening
Car Size (W x D x H) : 1500 x 2300 x 2500mm
Car Clear Height : 2400 mm
Car Door Size (W x H) : 1200 x 2400 mm
Car Door Safety : Light Curtain
Car Door Finish : HLSS
Car Door Sill : Aluminum
Car Decoration Line : Times Square 2.0
Front Wall Type : Expression
Front Wall Deco. : HLSS
Side Wall Deco. : HLSS
Rear Wall Deco. : HLSS
Mirror : Not Provided
Handrail : Not Provided
Floor Deco. & Recess : Rubber
Ceiling Deco. : Square Spot
Max. Add. Deco. Weight :-
Counterweight :
C/W Location in Shaft : Side
C/W Safety Gear : Not Provided
Accessible Space Below Pit : No
Other Requirements :
Air Conditioner in Car : Not Provided
Attendant Control : Standard
Automatic Rescue Device (ARD: Provided
Car Call Cancelling : Provided
Card Reader Interface : Provided
CCTV Interface : Provided
Earthquake Control Interface : Provided
Emergency Backup for Light & : Provided
Emergency Exit (Blind Zone) : Not provided
Emergency Power Control : Standard
Fireman Control : BR2 (Fire Homing)
Hall Lantern on Landing : Not Provided
Independent Control w/ Parkin : Provided
Intercom : 3-way (Car-MR-Control)
Multimedia LCD Display : Not Provided
Out of Service Control : Standard
PORT System : Not Provided
Pre-Arrival Gong : On Car
Supervisory Panel : CRT Monitoring
Voice Synthesizer : Not Provided
Other Special Requirements / C: -
AC
1 LANTAI DASAR
2 LANTAI 2
3 LANTAI 3
4 LANTAI 4
5 LANTAI 5
6 LANTAI 6
AC Wall mounted (3/4 PK)
- Pipa refrigerant + isolasi dia. 1/4" dan 3/8"
- Pipa drain Pvc AW + isolasi dia. 1/2"
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm
- Alat bantu dan Test Commissioning
VENTILASI UDARA
LANTAI DASAR
1 - Exhaust Fan (EF-01 s/d 8/LT.D Toilet
(Termasuk Pipa Pvc D + Grille + Support, dll)
Capacity : 50 Cfm
Type : Ceiling Fan
LANTAI 2 S/D 6
3 - Exhaust Fan (EF-01 s/d 12/LT.2 s/dToilet
(Termasuk Pipa Pvc D + Grille + Support, dll)
Capacity : 50 Cfm
Type : Ceiling Fan
L DAN ELEKTRIKAL
KAL DAN ELEKTRIKAL NON STANDART
HARGA SATUAN
URAIAN PEKERJAAN SAT VOL
(Rp)
BAKARAN
m 3.171 -
m 2.254 -
m 9.716 -
m 10.251 -
m 2.384 -
Exhaust c/w isolasi m 3.357 -
m 1.587 -
m 1.746 -
Tanki Dailly m 4.32 -
bh 2.00 -
bh 4.00 -
bh 4.00 -
bh 1.00 -
bh 1.00 -
bh 2.00 -
bh 2.00 -
bh 1.00 -
bh 2.00 -
bh 2.00 -
bh 1.00 -
bh 2.00 -
bh 1.00 -
bh 1.00 -
bh 1.00 -
bh 2.00 -
bh 6.00 -
bh 1.00 -
m 17.00 -
m 23.94 -
m 120.72 -
m 3.99 -
m 4.00 -
m 16.00 -
m 4.00 -
bh 5.00 -
bh 2.00 -
bh 1.00 -
bh 1.00 -
bh 2.00 -
bh 4.00 -
bh 2.00 -
bh 1.00 -
bh 4.00 -
m 18.78 -
m 6.77 -
m 19.84 -
m 13.98 -
m 8.35 -
m 39.25 -
m 8.00 -
m 24.66 -
m 107.23 -
m 7.27 -
bh 2.00 -
bh 1.00 -
bh 2.00 -
bh 75.00 -
bh 4.00 -
bh 10.00 -
bh 5.00 -
bh 10.00 -
bh 10.00 -
m 93.88 -
m 33.87 -
m 99.19 -
m 69.92 -
m 41.77 -
m 196.27 -
m 40.00 -
m 123.30 -
m 536.16 -
m 36.35 -
bh 10.00 -
bh 5.00 -
bh 10.00 -
bh 375.00 -
bh 20.00 -
EKTRONIK
peralatan MATV
secara lengkap termasuk peng-
peralatan sesuai diuraikan dlm
s, tetapi tidak terbatas pada item
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 2.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
50 ohm in conduit Dia.20 dari m 15.00 -
peralatan MATV
nnya sesuai Gambar
bh 2.00 -
bh 1.00 -
bh 12.00 -
titik 2.00 -
titik 1.00 -
titik 12.00 -
bh 10.00 -
bh 5.00 -
bh 60.00 -
-
titik 10.00 -
titik 5.00 -
titik 60.00 -
lot 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
FIRE ALARM
bh 1.00 -
bh 52.00 -
bh 10.00 -
bh 11.00 -
bh 2.00 -
bh 2.00 -
bh 2.00 -
bh 2.00 -
bh 1.00 -
bh 1.00 -
titik 52.00 -
titik 10.00 -
titik 11.00 -
titik 2.00 -
titik 2.00 -
titik 2.00 -
titik 2.00 -
titik 1.00 -
titik 1.00 -
bh 5.00 -
bh 265.00 -
bh 50.00 -
bh 60.00 -
bh 10.00 -
bh 10.00 -
bh 10.00 -
bh 10.00 -
bh 5.00 -
bh 5.00 -
titik 265.00 -
titik 50.00 -
titik 60.00 -
titik 10.00 -
titik 10.00 -
titik 10.00 -
titik 10.00 -
titik 5.00 -
titik 5.00 -
unit 1.00 -
unit 1.00 -
unit 5.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 1.00 -
unit 3.00 -
unit 2.00 -
unit 1.00 -
TATA SUARA
bh 1.00 -
bh 6.00 -
bh 4.00 -
bh 6.00 -
bh 4.00 -
bh 5.00 -
bh 30.00 -
lot 1.00 -
unit 1.00 -
unit 1.00 -
unit 2.00 -
bh 4.00 -
bh 4.00 -
bh 20.00 -
bh 20.00 -
lot 1.00 -
bh 2.00 -
set 1.00 -
Packaged Booster Pump
2 x 150 lpm / 3 Bar
2 Parallel Alternate
ctromotor, Pressure Tank, Panel Kontrol, Pressure switch,
, Gate Valve, Header & base Plat )
unit 2.00 -
GRP), lengkap dengan Assesories dan dudukan/ pondasi
set 1.00 -
Submersible multistage
bh 2.00 -
bh 2.00 -
bh 4.00 -
bh 2.00 -
bh 2.00 -
bh 1.00 -
set 1.00 -
lot 1.00 -
m 84.00 -
unit 1.00 -
25 m3 /hari
unit 2.00 -
lot 1.00 -
ng dibutuhkan, seperti ;
& urugan kembali, dll )
unit 1.00 -
unit 1.00 -
n 5, Type Oil
bh 68.00 -
unit 1.00 -
lot 1.00 -
et ke atas pondasi
angkur & alat bantu
ngan jacketing rockwool
BEL FEEDER
anel Pompa - Air Bersih
m' 10.00 -
m' 10.00 -
lot 1.00 -
Automatic on - off
mp (PC-EFP):
FRC 4 x 185 mm2 + BC 70 mm2 m 10.75 -
unit 2.00 -
Centrifugal
21.000 Cfm / 2,03 Inch Wg
Automatic ON-OFF
unit 1.00 -
Centrifugal
Automatic ON-OFF
unit 1.00 -
Centrifugal
Automatic ON-OFF
m 64.00 -
m 60.00 -
bh 12.00 -
bh 12.00 -
ttk 4.00 -
unit 1.00 -
HS 40 x 40 x 2 (Hotdip Galvanis)
Aluminium non slip surface 3 mm thick as landing
working platform roda karet dia.4"
2400 x 600 x 1379 mm
unit 2.00 -
on platform
2 unit untuk setiap sangkar
630 kg/unit
8 - 10 m/min
3PH/380V/50Hz/1 HP
unit 2.00 -
Galvanized steel plat 1,5 mm
unit 1.00 -
Type wheather proof (IP 65)
2mm, Busbar Cu tin plating
Powder coating anti karat
busbar, metering, relay, dan aksesories lainya sesuai gambar
set 1.00 -
8,2 mm (disesuaikan denga tinggi bangunan)
6 x 19 IWRC ) 2 x 30 m
6 x 19 IWRC ) 2 x 30 m
IWRC Galvanized
set 1.00 -
5 x 2,5 mm2 (1 x 75 m)
NYYHY / Flexicore
set 2.00 -
dia. 16 mm (2 x 50 m)
Karam saftec
Karam saftec
ISTEM PENGGANTUNG)
set 1.00 -
(galvanized) pcs 73.00 -
, bolt & nut, pengelasan) titik 292.00 -
pcs 73.00 -
re, bolt & nut, pengelasan) set 146.00 -
lot 1.00 -
lot 1.00 -
Unit 1.00 -
: Passengger elevator
: Machine Room
: 15 person
: 4800 mm
: 1800 mm
: 1800 x 1930 mm
: GF, 1,2,3,5,6
: ACVVVF Gearless
: 380 V/ 50 Hz
: 220 V/ 50 Hz
: Collective Selective
: Linea 100
: Linea 100
: Linea 100
: Aluminum
: Aluminum
: Times Square 2.0
: Expression
: Not Provided
: Not Provided
: Not Provided
: Not Provided
: Standard
: Not provided
: Standard
: BR1 (Fire Homing)
: Not Provided
: 3-way (Car-MR-Control)
: Not Provided
: Standard
: Not Provided
: CRT Monitoring
: Not Provided
Unit 1.00 -
: Service/Fireman's Lift
: Machine Room
: 15 person
: 4600 mm
: 1500 mm
: 2300 x 2850 mm
: GF, 1,2,3,5,6,7,8
: ACVVVF PM Gearless
: 380 V/ 50 Hz
: 220 V/ 50 Hz
: Collective Selective
: Linea 100
: Linea 100
: Linea 100
: Aluminum
: Aluminum
: Times Square 2.0
: Expression
: Not Provided
: Not Provided
: Square Spot
: Not Provided
: Not Provided
: Standard
: Not provided
: Standard
: BR2 (Fire Homing)
: Not Provided
: 3-way (Car-MR-Control)
: Not Provided
: Standard
: Not Provided
: CRT Monitoring
: Not Provided
Unit 1.00 -
Unit 1.00 -
Unit 2.00 Include
Unit 2.00 Include
Unit 2.00 Include
Automatic Rescue Device (ARD) Unit 2.00 Include
Set 1.00 Include
masuk kabel power / control ke Set 2.00 Include
l power dari panel power ke panel kontrol.
masuk kabel power / control ke Set 1.00 Include
ower dari panel power ke panel kontrol.
tegrasi dengan acces card building lot 1.00 Include
jin Depnaker lot 1.00 Include
asuk biaya bahan bakar saat test lot 1.00 Include
unit 8.00 -
1/4" dan 3/8" m 96.00 -
m 80.00 -
duit 20 mm m 120.00 -
lot 1.00 -
unit 16.00 -
1/4" dan 3/8" m 192.00 -
m 160.00 -
duit 20 mm m 240.00 -
lot 1.00 -
unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -
unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -
unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -
unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -
unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -
unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -
unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -
unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -
unit 12.00 -
1/4" dan 3/8" m 144.00 -
m 120.00 -
duit 20 mm m 180.00 -
lot 1.00 -
unit 24.00 -
1/4" dan 3/8" m 288.00 -
m 240.00 -
duit 20 mm m 360.00 -
lot 1.00 -
unit 8.00 -
+ Support, dll)
unit 7.00 -
+ Support, dll)
unit 60.00 -
+ Support, dll)
ROL / CARD
M' 150.00 -
M' 50.00 -
M' 0.00 -
M' 1.00 -
M' 0.00 -
M' 50.00 -
manan dan Keselamatan Kerja lot 1.00 -
lot 1.00 -
lot 1.00 -
lot 1.00 -
TOTAL HARGA
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
By Sipil
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
DAFTAR UPAH PEKERJA
1 PEKERJA Org / hr
2 TUKANG GALI Org / hr
3 KEPALA TUKANG BATU Org / hr
4 TUKANG BATU Org / hr
5 KEPALA TUKANG KAYU Org / hr
6 TUKANG KAYU Org / hr
7 KEPALA TUKANG BESI Org / hr
8 TUKANG BESI Org / hr
9 KEPALA TUKANG CAT Org / hr
10 TUKANG CAT Org / hr
11 TUKANG ASPAL Org / hr
12 MANDOR / PENGAWAS Org / hr
13 KEPALA INSTALATOR Org / hr
14 INSTALATOR Org / hr
15 PEMBANTU INSTALATOR Org / hr
16 TUKANG BABAT RUMPUT Org / hr
17 TUKANG TAMAN Org / hr
18 KEPALA TUKANG PASANG PIPA / LEDENG Org / hr
19 TUKANG PASANG PIPA / LEDENG Org / hr
20 OPERATOR ALAT BESAR Org / hr
21 PEMBANTU OPERATOR ALAT BESAR Org / hr
22 TUKANG LAS Org / hr
ANALISA MEKANIKAL
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh PI
Bahan An. SNI ( Revisi ) 6.33.1
1 bh PI @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 0.00 = Rp
0.150 Oh Tukang @ Rp. 0.00 = Rp
0.015 Oh Kepala tukang @ Rp. 0.00 = Rp
0.010 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 m' pipa BSP sch. 40 ø 1,5"
Bahan An. SNI ( Revisi ) 6.13.1
1.000 m' Pipa BSP sch 40 @ Rp. 0.00 = Rp
20 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.13.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m c/w coupling machino
jet nozzel, hydran valve 1,5" dan 2,5", dan hose rack
Bahan An. SNI ( Revisi ) 6.33.1
1 bh IHB @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 0.00 = Rp
0.250 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh Ooutdoor Hydran Box (OHB) Type C, termasuk fire hose 2,5"x30 m c/w coupling machino
jet nozzel 2,5"
Bahan An. SNI ( Revisi ) 6.33.1
1 bh OHB @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.180 Oh Pekerja @ Rp. 0.00 = Rp
0.180 Oh Tukang @ Rp. 0.00 = Rp
0.040 Oh Kepala tukang @ Rp. 0.00 = Rp
0.040 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh pompa Booster
Bahan An. SNI ( Revisi ) 6.32.1
1 bh Booster Pump @ Rp. 0.00 = Rp
1 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh GV dia. 65
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 65 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh GV dia. 50
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh GV dia. 32
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 32 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh ST dia. 65
Bahan An. SNI ( Revisi ) 6.33.1
1 bh ST dia. 65 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh ST dia. 32
Bahan An. SNI ( Revisi ) 6.33.1
1 bh ST dia. 32 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh FJ dia. 65
Bahan An. SNI ( Revisi ) 6.33.1
1 bh FJ dia. 65 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh FJ dia. 32
Bahan An. SNI ( Revisi ) 6.33.1
1 bh FJ dia. 32 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh Air Vent (AV)
Bahan An. SNI ( Revisi ) 6.33.1
1 bh Air Vent (AV) @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh GV dia. 80
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 80 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh LV dia. 80
Bahan An. SNI ( Revisi ) 6.33.1
1 bh LV dia. 80 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh GV dia. 25
Bahan An. SNI ( Revisi ) 6.33.1
1 bh GV dia. 25 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 0.00 = Rp
0.050 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.0018 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh sprinkle
Bahan An. SNI ( Revisi ) 6.33.1
1 bh Sprinkle @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh CV dia. 50
Bahan An. SNI ( Revisi ) 6.33.1
1 bh CV dia. 50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh ST dia. 50
Bahan An. SNI ( Revisi ) 6.33.1
1 bh ST dia. 50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 bh FJ dia. 50
Bahan An. SNI ( Revisi ) 6.33.1
1 bh FJ dia. 50 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 m 1000 x 300
Bahan An. SNI ( Revisi ) 6.33.1
1 bh 1000 x 300 @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 0.00 = Rp
0.080 Oh Tukang @ Rp. 0.00 = Rp
0.010 Oh Kepala tukang @ Rp. 0.00 = Rp
0.002 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 set Konstruksi david socket arm (galvanized)
Bahan An. SNI ( Revisi ) 6.9.1
1.000 set Konstruksi david s@ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 titik Angkore plate sitting (angkore, bolt & nut, pengelasan)
Bahan An. SNI ( Revisi ) 6.9.1
1.000 titik Angkore plate sitt @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 set Angkote plate tie back (angkore, bolt & nut, pengelasan)
Bahan An. SNI ( Revisi ) 6.9.1
1.000 set Angkote plate tie @ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 unit Pemasangan Lif Passenger
Bahan An. SNI ( Revisi ) 6.9.1
1.000 unit Pemasangan Lif P@ Rp. 0.00 = Rp
15 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 0.00 = Rp
0.090 Oh Tukang @ Rp. 0.00 = Rp
0.009 Oh Kepala tukang @ Rp. 0.00 = Rp
0.027 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 bh AC
Bahan An. SNI ( Revisi ) 6.31.1
1 bh AC 3/4 pk @ Rp. 0.00 = Rp
10 % Perlengkapan = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 0.00 = Rp
1.700 Oh Tukang @ Rp. 0.00 = Rp
0.700 Oh Kepala tukang @ Rp. 0.00 = Rp
0.700 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Memasang 1 bh AC
Bahan An. SNI ( Revisi ) 6.31.1
0.00 1 bh AC 1/2 pk @ Rp.
0.00 10 % Perlengkapan
0.00 Sub total :
Upah An. SNI ( Revisi ) 6.32.2
0.00 1.300 Oh Pekerja @ Rp.
0.00 1.700 Oh Tukang @ Rp.
0.00 0.700 Oh Kepala tuka@ Rp.
0.00 0.700 Oh Mandor @ Rp.
0.00 Sub total :
0.00 Total upah+bahan :
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 = Rp 0.00
= Rp 0.00
Sub total : = Rp 0.00
0.00 = Rp 0.00
0.00 = Rp 0.00
0.00 = Rp 0.00
0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00
DAFTAR HARGA BAHAN BANGUNAN
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
G PERALATAN HYDRANT
1 Indoor Hydran Box (IHB) Type B Bh Rp.
2 Outdoor Hydran Box (OHB) Type C Bh Rp.
3 Hydran pillar 2 ways (Ex. lokal) Bh Rp.
4 Siamesse connection (ex. Local) Bh Rp.
5 Automatic Air Vent Bh Rp.
6 Fire Extinguisher Type CO2 Class B,C Kap. 4,6 kg bh Rp.
7 Fire Extinguisher Type Class A,B,C Kap. 3,5 kg Bh Rp.
Pressure Indicator (PI) Bh Rp.
Pompa Diesel Pemadam Kebakaran Bh Rp.
Jockey Pump Bh Rp.
Electrical Pump Bh Rp.
H FAN
1 Exhaust Ceiling Mounted Kap. 100 Cfm Bh Rp.
2 Grille 100x100 mm Bh Rp.
I 1 Waterheater Bh Rp.
WCL + Panel Bh Rp.
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang 1 M Kabel Power ( NYY 4 x (1c x 300) mm2 + NYA 150 mm² )
Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 4 x (1c x 300) mm2 @ Rp. 0.00 = Rp
1.000 m NYA 150 mm² @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang MCFA
Bahan An. SNI ( Revisi ) 6.29.1
1.000 bh MCFA-10 Zone @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.29.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang 1 M Kabel pentanahan ( FRC STP AWG 16 1 Pairs + Kabel Power FRC 3 x 2,5 mm ² )
Bahan An. SNI ( Revisi ) 6.41.1
1.000 m FRC STP AWG 16 1 Pairs @ Rp. 0.00 = Rp
1.000 m Kabel Power FRC 3 x 2,5 mm ²@ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.41.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang MDF-TS
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh MDF-TS @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Biaya Instalasi
Bahan An. SNI ( Revisi ) 6.55.1
1.000 ls Biaya Instalasi @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Material Bantu
Bahan An. SNI ( Revisi ) 6.55.1
1.000 ls Material Bantu @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang Modulator
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Modulator @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang Divider
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Divider @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang Announciator
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Announciator @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang Mixer
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh Mixer @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang Transformator
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Transformator @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang Genset
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Genset @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Memasang Instalasi Genset
Bahan An. SNI ( Revisi ) 6.23.1
1.000 set Instalasi Genset @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.23.2
0.025 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.025 Oh Tukang listrik @ Rp. 0.00 = Rp
0.017 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.014 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang Pressurized Fan 10.000 Cfm
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Pressurized Fan 10.000 Cfm @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.750 Oh Tukang listrik @ Rp. 0.00 = Rp
0.500 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.350 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Memasang PC Server
Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh PC Server @ Rp. 0.00 = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 0.00 = Rp
0.166 Oh Tukang listrik @ Rp. 0.00 = Rp
0.033 Oh Kepala tukang istrik @ Rp. 0.00 = Rp
0.017 Oh Mandor @ Rp. 0.00 = Rp
Sub total : = Rp
Lain-lain K3 + CAR = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
Total upah+bahan : = Rp
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DAFTAR HARGA BAHAN BANGUNAN
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
A BAHAN ELEKTRIKAL
1 Pasang listrik /Wiring Ttk Rp.
2 Lampu TL 1 x 10 w Bh Rp.
3 Lampu TL 1 x 20 w Bh Rp.
4 Lampu TL 1 x 40 w Bh Rp.
5 Lampu pijar 25 w Bh Rp.
6 Lampu pijar 40 - 100 w Bh Rp.
7 Lampu TKI, TL 2x36 watt Bh Rp.
8 Lampu V-SHAPE, TL 2x36 watt Bh Rp.
9 Lampu TL Balk 1x18 watt Bh Rp.
10 Lampu TL Balk 1x18 watt + Battery Bh Rp.
11 Lampu TL Balk 1x36 watt Bh Rp.
12 Lampu Baret 32 watt + Battery Bh Rp.
13 Lampu Baret 32 watt Bh Rp.
Lampu Baret 10 watt Bh Rp.
Lampu TL Balk EM 36 Watt Bh Rp.
14 Lampu LED 7 watt Bh Rp.
15 Lampu LED 7 watt c/w battery charger Bh Rp.
16 Lampu Downlight 13 watt Bh Rp.
17 Lampu Downlight 18 watt Bh Rp.
18 Lampu Taman SL-26 watt Bh Rp.
19 Lampu Exit 18 watt + Battery Bh Rp.
Tap off 2 way Bh Rp.
20 Isolator Bh Rp.
21 Las Doof Bh Rp.
22 Fiting Plafond Bh Rp.
23 T dos PVC Bh Rp.
24 Stop Kontak Wall Type Bh Rp.
25 Stop Kontak Floor Type Bh Rp.
26 Stop Kontak-AC Bh Rp.
27 Stop Kontak-TV Bh Rp.
28 Stop Kontak-TELEPON Bh Rp.
29 Saklar tunggal Bh Rp.
30 Sakla ganda Bh Rp.
31 Saklar Hotel 1 gang Bh Rp.
32 Saklar Hotel 2 gang Bh Rp.
33 Kabel NYA 1000 Volt 1,5 mm M1 Rp.
34 Kabel NYA 1000 Volt 2x1,5 mm M1 Rp.
35 Kabel NYA 1000 Volt 3x1,5 mm M1 Rp.
Kabel NYA 1000 Volt 3x2,5 mm M1 Rp.
36 Kabel NYA 1000 Volt 2,5 mm M1 Rp.
37 Kabel NYA 1000 Volt 2x2,5 mm M1 Rp.
38 Kabel NYA 1000 Volt 4 mm M1 Rp.
39 Kabel NYA 1000 Volt 6 mm M1 Rp.
40 Kabel NYA 1000 Volt 10 mm M1 Rp.
41 Kabel NYA 1000 Volt 16 mm M1 Rp.
42 Kabel NYA 1000 Volt 25 mm M1 Rp.
43 Kabel NYA 1000 Volt 35 mm M1 Rp.
44 Kabel NYA 1000 Volt 50 mm M1 Rp.
45 Kabel NYA 1000 Volt 70 mm M1 Rp.
46 Kabel NYA 1000 Volt 95 mm M1 Rp.
47 Kabel NYA 1000 Volt 120 mm M1 Rp.
48 Kabel NYA 1000 Volt 150 mm M1 Rp.
49 Kabel NYA 1000 Volt 185 mm M1 Rp.
50 Kabel NYM 300/750 Volt 3x2,5 mm2 M1 Rp.
51 Kabel NYM 300/750 Volt 3x4 mm2 M2 Rp.
Kabel NYY 0,6/1 Kv 2x1,5 mm2 M1 Rp.
Kabel NYY 0,6/1 Kv 2x2,5 mm2 M1 Rp.
52 Kabel NYY 0,6/1 Kv 3x2,5 mm2 M1 Rp.
53 Kabel NYY 0,6/1 Kv 4x2,5 mm2 M1 Rp.
54 Kabel NYY 0,6/1 Kv 4x4 mm2 M1 Rp.
55 Kabel NYY 0,6/1 Kv 4x6 mm2 M1 Rp.
56 Kabel NYY 0,6/1 Kv 4x10 mm2 M1 Rp.
57 Kabel NYY 0,6/1 Kv 4x16 mm2 M1 Rp.
58 Kabel NYY 0,6/1 Kv 4x25 mm2 M1 Rp.
59 Kabel NYY 0,6/1 Kv 4x35 mm2 M1 Rp.
60 Kabel NYY 0,6/1 Kv 4x50 mm2 M1 Rp.
61 Kabel NYY 0,6/1 Kv 4x70 mm2 M1 Rp.
62 Kabel NYY 0,6/1 Kv 4x95 mm2 M1 Rp.
63 Kabel NYY 0,6/1 Kv 4x120 mm2 M1 Rp.
64 Kabel NYY 0,6/1 Kv 4x150 mm2 M1 Rp.
65 Kabel NYY 0,6/1 Kv 4x185 mm2 M1 Rp.
66 Kabel NYY 0,6/1 Kv 4x240 mm2 M1 Rp.
67 Kabel NYY 0,6/1 Kv 4x300 mm2 M1 Rp.
Kabel NYY 0,8/1 Kv 1x120 mm2 M1 Rp.
Kabel NYY 0,8/1 Kv 1x240 mm2 M1 Rp.
NYMHY 2 x 1,5 mm2 M1 Rp.