A PEKERJAAN INSTALASI AIR KOTOR + AIR SISA
SPEK PIPA WAVIN AW
1 Pekerjaan Instalasi air kotor pipa pvc Ø 1/2 " 40.00 m1 25,000.00 1,000,000.00
2 Pekerjaan Instalasi air kotor pipa pvc Ø 4 " DARI KLOSET 40.00 m1 85,000.00 3,400,000.00
PIPA HORISONTAL
3 Pekerjaan Instalasi air SISA pipa pvc Ø 3 " DARI TOILET 40.00 m1 65,000.00 2,600,000.00
4 Pekerjaan Instalasi air HUJAN pipa pvc Ø 3 " 144.00 m1 65,000.00 9,360,000.00
16,360,000.00
JUMLAH A
1 Pekerjaan Instalasi air bersih pipa PVC Ø 3/4 " 60.00 m1 25,000.00 1,500,000.00
1,500,000.00
JUMLAH B
C PEKERJAAN SEPTICTANK
3,837,500.00
JUMLAH C
###
A PEKERJAAN INSTALASI PENERANGAN
1 LANTAI 1 + LANTAI MEZANINE
1 Pekerjaan Instalasi Penerangan 34.00 ttk 180,000.00 6,120,000.00
6,120,000.00
JUMLAH A
12,600,000.00
JUMLAH B
C PERALATAN UTAMA
1 ARMATURE
1 Lampu RM2X36 watt OUTBOW 32.00 bh 350,000.00 11,200,000.00
2 Fitting lampu + bolam 9watt 2.00 bh 55,000.00 110,000.00
3 EMERGENCY LAMP 10.00 bh 150,000.00 1,500,000.00
53,508,000.00
JUMLAH C
###
A PEKERJAAN INSTALASI TATA UDARA
3,500,000.00
JUMLAH A
8,400,000.00
JUMLAH B
C PERALATAN UTAMA
109,400,000.00
JUMLAH C