REKAPITULASI

PROGRAM : PENGEMBANGAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS DAN JARINGANNYA
KEGIATAN : PENGADAAN SARANA DAN PRASARANA AIR BERSIH PUSKESMAS
PEKERJAAN : BELANJA MODAL PENGADAAN SUMUR BOR DAN JARINGAN PERPIPAAN UNTUK PUSKESMAS WEOE
LOKASI : PUSKESMAS WEOE
TAHUN ANGGARAN : 2020

JUMLAH
NO URAIAN
( Rp )
A PEKERJAAN PENGEBORAN AIR
I PEKERJAAN PERSIAPAN 18,650,000.00
II PEKERJAAN PENGEBORAN AIR 43,500,000.00
III PEKERJAAN RUMAH GENSET DAN POMPA 22,770,828.83
IV PENGADAAN POMPA SUBMERSIBLE 37,335,526.63
Jumlah A 122,256,355.46
B PEKERJAAN BAK RESERVOAR 2,5 X 2 X 2 M ( 2 Unit )
I PEKERJAAN TANAH 215,770.31
II PEKERJAAN BETON 37,237,561.74
III PEKERJAAN PERLENGKAPAN BAK DAN INSTALASI AIR 14,847,353.86
Jumlah B 52,300,685.91
( 2 Unit ) 104,601,371.81
C PEKERJAAN PEMBERSIHAN AKHIR
I Pekerjaan pembersihan akhir 415,000.00
Jumlah C 415,000.00
JUMLAH 227,272,727.27
PPN 10 % 22,727,272.73
TOTAL 250,000,000.00
DIBULATKAN 250,000,000.00

TERBILANG :
Dua Ratus Lima Puluh Juta Rupiah

Rekapitulasi RAB
DAFTAR KUANTITAS DAN HARGA
PROGRAM : PENGEMBANGAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS DAN JARINGANNYA

KEGIATAN : PENGADAAN SARANA DAN PRASARANA AIR BERSIH PUSKESMAS

PEKERJAAN : BELANJA MODAL PENGADAAN SUMUR BOR DAN JARINGAN PERPIPAAN UNTUK PUSKESMAS WEOE

LOKASI : PUSKESMAS WEOE


TAHUN ANGGARAN : 2020

HARGA SATUAN JUMLAH HARGA


NO VOLUME SAT URAIAN
(Rp) (Rp)

1 2 3 4 5 6

A PEKERJAAN PENGEBORAN AIR

I PEKERJAAN PERSIAPAN
1 1.000 Ls Mobilisasi dan Demobilisasi 5,000,000.00 5,000,000.00

2 1.000 Ttk Survey titik air menggunakan Geolistrik 10,500,000.00 10,500,000.00

3 1.000 Ls Pembersihan Lokasi 250,000.00 250,000.00

4 1.000 Ls Papan Nama Proyek 400,000.00 400,000.00

5 1.000 Ls Pembuatan Direksi Keet/Gudang material 1,500,000.00 1,500,000.00

6 1.000 Ls Pengadaan air kerja 1,000,000.00 1,000,000.00


Jumlah 1 18,650,000.00

II PEKERJAAN PENGEBORAN AIR

1 1.000 Titik Pengeboran Air dengan Mesin Rakitan penggerak mata bor berkapasitas 20,000,000.00 20,000,000.00

( 15 - 23 PK ) dengan kedalaman 20 - 40 meter, dengan menggunaka mata bor -

ukuran 6 dim -
2 1.000 Ls Instalasi dan pemasangan Kesing Pipa PVC Dia 6" dan Accecories pada 15,000,000.00 15,000,000.00

lubang pengeboran -

3 1.000 Ls Instalasi dan pemasangan Pipa Air GIP dia 1,5" Medium A dan Accecories pada 7,000,000.00 7,000,000.00

Pompa ke dalam lubang kesing -

4 1.000 Ls Pengurasan dan Pembersihan Air serta Tes Pengaliran Air 1,500,000.00 1,500,000.00
Jumlah 2 43,500,000.00

III PEKERJAAN RUMAH GENSET DAN POMPA

1 3.500 M3 Galian tanah 43,125.00 150,937.50

2 0.350 M3 Urugan pasir di bawah pondasi 125,250.00 43,837.50

3 1.167 M3 Urugan kembali tanah bekas galian 10,781.25 12,578.13

0.780 M3 Urugan pasir dibawah lantai 125,250.00 97,695.00


4 2.400 M3 Urugan sirtu peninggi lantai 134,500.00 322,800.00

5 1.050 M3 Pasangan aanstamping, batu kali 250,305.00 262,820.25

6 2.625 M3 Pasangan Pondasi batu kali 1 PC : 5 PP 548,430.00 1,439,628.75

7 0.300 M3 Sloof beton bertulang 15/20 4,313,970.00 1,294,191.00

8 20.640 M2 Pasangan tembok 1/2 bata merah 1 Pc : 5 Psr 112,500.000 2,322,000.00


9 0.116 M1 Kolom praktis beton bertulang 11/11 69,055.000 8,021.43

10 0.165 M1 Ringbalk beton bertulang 11/15 85,395.000 14,090.18

11 41.280 M2 Plesteran tembok tebal 20 mm, 1 PC : 4 PP 46,291.800 1,910,925.50

12 41.280 M2 Acian tembok dengan saus semen 22,720.000 937,881.60

13 0.180 M3 Cor plat lantai beton bertulang 1 Pc : 2 Psr : 3 Krkl T = 12 cm 3,867,212.500 696,098.25

14 0.315 M3 Cor lantai rabat beton 1 Pc : 3 Psr : 5 Krkl T = 7 cm 665,075.00 209,498.63


15 19.550 M2 Rangka atap baja ringan canal C Truss C 75/0.75 + reng 27/0.45 255,600.00 4,996,980.00

16 19.550 M2 Penutup atap Seng Galvalum 0,25 108,200.00 2,115,310.00

17 33.200 M1 Listplak Calsiplank 64,775.00 2,150,530.00


18 41.280 M2 Cat tembok 31,129.00 1,285,005.12

19 1.000 Unit Pintu terali besi 1.7 x 2.1 m 2,500,000.00 2,500,000.00

Jumlah 3 22,770,828.83

IV PENGADAAN POMPA SUBMERSIBLE

A PENGADAAN POMPA
Merk : tidak disyaratkan ( kwalitas baik )

Type :

1 1.000 Bh Phase : 1 fase 25,000,000.00 25,000,000.00

2 1.000 Bh Panel pompa 1 fase 4,500,000.00 4,500,000.00

3 50.000 M1 Kabel pompa serabut 17,500.00 875,000.00

4 1.000 Ls Instalasi pipa GIP 1 1/4 dan acccories dari pompa ke Bak Reservoar 2,250,000.00 2,250,000.00

B PEKERJAAN INSTALASI LISTRIK

1 100.000 M Instalasi kabel listrik (Hitam) dari gedung ke Rumah Pompa 22,000.00 2,200,000.00

2 1.000 Bh MCB 2 Group 95,000.00 95,000.00

3 4.000 Titik Tiang penyangga kabel dari pipa Dia 2" ( tinggi 3 m ) sudah termasuk cor dudukan 250,000.00 1,000,000.00
tiang dan biaya pemasangan

Rencana Anggaran Biaya


HARGA SATUAN JUMLAH HARGA
NO VOLUME SAT URAIAN
(Rp) (Rp)

1 2 3 4 5 6

C PEKERJAAN BAK PELINDUNG


1 0.338 M3 Galian tanah 43,125.00 14,576.25

2 0.085 M3 Urugan pasir T = 5 cm 125,250.00 10,583.63

3 0.423 M3 Rabat beton T = 25 cm 665,075.00 280,994.19

4 2.080 M2 Pasangan bata merah 1 bata 1 Pc : 3 Psr 243,952.50 507,421.20

5 4.808 M2 Plesteran 1Pc : 3Psr 50,481.20 242,713.61


6 4.808 M2 Acian 22,720.00 109,237.76

7 1.000 Bh Plat penutup bak ( bahan besi siku dan plat baja ) 250,000.00 250,000.00

Jumlah 4 37,335,526.63

JUMLAH A= ( I + II + III + IV ) 122,256,355.46

B PEKERJAAN BAK RESERVOAR 2,5 X 2 X 2 M ( 2 Unit )

I PEKERJAAN TANAH
1 4.00 M3 Galian tanah Pondasi 43,125.00 172,500.00

2 0.20 M3 Urugan pasir dibawah pondasi 125,250.00 25,050.00

3 1.69 M3 Urugan tanah bekas galian 10,781.25 18,220.31

Jumlah 1 215,770.31

II PEKERJAAN BETON
1 0.40 M3 Cor lantai kerja rabat beton 1 Pc : 3 Psr : 5 Krkl 665,075.00 266,030.00

2 0.80 M3 Foot pat 1 Pc : 2 Psr : 3 Krkl 4,774,955.00 3,819,964.00

3 1.30 M3 Kolom 35/35 1 Pc : 2 Psr : 3 Krkl 4,774,955.00 6,200,279.07

4 0.74 M3 Balok gantung 25/35 1 Pc : 2 Psr : 3 Krkl 5,472,545.00 4,022,320.58

5 0.06 M3 Balok gantung 15/20 1 Pc : 2 Psr : 3 Krkl 5,472,545.00 303,726.25


6 0.72 M3 Cor plat dasar beton bertulang T= 15 cm 1 Pc : 2 Psr : 3 Krkl 3,867,212.50 2,771,341.16

7 2.43 M3 Cor dinding beton bertulang T= 15 cm 1 Pc : 2 Psr : 3 Krkl 5,125,470.00 12,454,892.10

8 0.75 M3 Kolom Bak beton bertulang 25/25 1 Pc : 2 Psr : 3 Krkl 4,774,955.00 3,581,216.25
9 0.29 M3 Ringbalk beton bertulang 15/20 1 Pc : 2 Psr : 3 Krkl 5,472,545.00 1,600,719.41

10 0.57 M3 Cor plat penutup beton bertulang T= 12 cm 1 Pc : 2 Psr : 3 Krkl 3,867,212.50 2,217,072.93

Jumlah 2 37,237,561.74
III PEKERJAAN PERLENGKAPAN BAK DAN INSTALASI AIR

1 1.000 Ls Pekerjaan plat penutup lubang kontrol 150,000.00 150,000.00

2 66.992 M2 Pekerjaan pengecetan bak dengan water proof 41,010.00 2,747,353.86


3 1.000 Ls Pekerjaan tangga besi pada bak reservoar ( bahan dari pipa dia 1" ) 750,000.00 750,000.00

4 1.000 Ls Pasang pipa hawa ( pipa GIP 2" Medium A ) 125,000.00 125,000.00
5 1.000 Ls Pasang pipa kuras dan dop( pipa GIP 1,5" Medium A ) 100,000.00 100,000.00

6 1.000 Ls Pipa over flow ( pipa GIP 1,5" Medium A ) 100,000.00 100,000.00

7 1.000 Ls Pipa inlet ( pipa GIP 1 1/4" Medium A ) 100,000.00 100,000.00


8 1.000 Ls Pipa outlet ( pipa PVC 1,5" ) 25,000.00 25,000.00

9 1.000 Ls Instalasi pipa PVC 1,5" dan Accecories dari bak reservoar atas 750,000.00 750,000.00

ke bangunan gedung , sudah termasuk biaya galian lubang pipa,

urugan pasir, dan pemadatan kembali

10 1.000 Ls Instalasi pipa GIP 1,5" Meium A dan Accecories dari bak reservoar A ke Bak 10,000,000.00 10,000,000.00

reservoar B ( Asumsi 100 m ), sudah termasuk biaya galian lubang pipa,

urugan pasir, dan pemadatan kembali

Jumlah 3 14,847,353.86

JUMLAH B = ( I + II + III ) 52,300,685.91

( 2 Unit ) 104,601,371.81
C PEKERJAAN PEMBERSIHAN AKHIR

1 1.000 Ls Pekerjaan pembersihan akhir 415,000.00 415,000.00

JUMLAH C 415,000.00

Rencana Anggaran Biaya


DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PROGRAM : PENGEMBANGAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS DAN JARINGANNYA

KEGIATAN : PENGADAAN SARANA DAN PRASARANA AIR BERSIH PUSKESMAS

PEKERJAAN : BELANJA MODAL PENGADAAN SUMUR BOR DAN JARINGAN PERPIPAAN UNTUK PUSKESMAS WEOE

LOKASI : PUSKESMAS WEOE

TAHUN ANGGARAN : 2020

1 m3 Menggali tanah biasa, sedalam 1 meter

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Pekerja OH 0.7500 55,000.00 41,250.00


Tenaga Kerja
Mandor OH 0.0250 75,000.00 1,875.00
Jumlah harga per satuan pekerjaan 43,125.00

1 m3 Urugan tanah kembali bekas galian

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Pekerja OH 0.1875 55,000.00 10,312.50


Tenaga Kerja
Mandor OH 0.0063 75,000.00 468.75
Jumlah harga per satuan pekerjaan 10,781.25

Mengurug 1 m3 pasir urug

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Bahan Pasir Urug m3 1.2000 90,000.00 108,000.00


Pekerja OH 0.3000 55,000.00 16,500.00
Tenaga Kerja
Mandor OH 0.0100 75,000.00 750.00
Jumlah harga per satuan pekerjaan 125,250.00

Mengurug 1 m3 sirtu padat unutk peninggian lantai bangunan

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Bahan sirtu m3 1.2000 100,000.00 120,000.00


Pekerja OH 0.2500 55,000.00 13,750.00
Tenaga Kerja
Mandor OH 0.0100 75,000.00 750.00
Jumlah harga per satuan pekerjaan 134,500.00

Memasang 1 m3 pondasi batu kali 1 PC : 5 PP

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Batu kali m3 1.2000 138,000.00 165,600.00


Bahan PC kg 133.0000 1,350.00 179,550.00
PP m3 0.5440 120,000.00 65,280.00
Pekerja OH 1.5000 55,000.00 82,500.00
Tukang batu OH 0.7500 60,000.00 45,000.00
Tenaga Kerja
Kepala tukang OH 0.0750 65,000.00 4,875.00
Mandor OH 0.0750 75,000.00 5,625.00
Jumlah harga per satuan pekerjaan 548,430.00

Memasang 1 m3 batu kosong (aanstamping)

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Batu kali m3 1.2000 138,000.00 165,600.00


Bahan
PU m3 0.4320 90,000.00 38,880.00
Pekerja OH 0.7800 55,000.00 42,900.00
Tenaga Kerja
Mandor OH 0.0390 75,000.00 2,925.00
Jumlah harga per satuan pekerjaan 250,305.00

Membuat 1 m3 sloof beton bertulang 15/20 (200 kg besi + bekisting)

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Kayu papan klas III m3 0.2700 1,600,000.00 432,000.00


Paku 5-12 cm kg 2.0000 17,000.00 34,000.00
Minyak bekisting Liter 0.6000 25,000.00 15,000.00
Besi beton polos kg 210.0000 12,000.00 2,520,000.00
Bahan
Kawat beton kg 3.0000 15,000.00 45,000.00
PC m3 336.0000 1,350.00 453,600.00
PB m3 0.5400 120,000.00 64,800.00
KR m3 0.8100 250,000.00 202,500.00
Pekerja OH 5.6500 55,000.00 310,750.00
Tukang batu OH 0.2750 60,000.00 16,500.00
Tukang kayu OH 1.5600 60,000.00 93,600.00
Tenaga Kerja
Tukang besi OH 1.4000 60,000.00 84,000.00
Kepala tukang OH 0.3230 65,000.00 20,995.00
Mandor OH 0.2830 75,000.00 21,225.00
Jumlah harga per satuan pekerjaan 4,313,970.00

Analisa Harga Satuan


Membuat 1 m3 Ringbalk gantung beton bertulang (200 kg besi + bekisting)

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Kayu klas III papan m3 0.3200 1,600,000.00 512,000.00


Paku 5-12 cm kg 3.2000 17,000.00 54,400.00
Minyak bekisting Liter 1.6000 25,000.00 40,000.00
Besi beton polos kg 210.0000 12,000.00 2,520,000.00
Kawat beton kg 3.0000 15,000.00 45,000.00
PC m3 336.0000 1,350.00 453,600.00
Bahan
PB m3 0.5400 120,000.00 64,800.00
KR m3 0.8100 250,000.00 202,500.00
Kayu klas II balok m3 0.1400 2,800,000.00 392,000.00
Plywood 9 mm Lembar 2.8000 165,000.00 462,000.00

Dolken kayu Ø 8-10 cm panjang 4 m Batang 16.0000 7,500.00 120,000.00

Pekerja OH 6.3500 55,000.00 349,250.00


Tukang batu OH 0.2750 60,000.00 16,500.00
Tukang kayu OH 1.8500 60,000.00 111,000.00
Tenaga Kerja
Tukang besi OH 1.4000 60,000.00 84,000.00
Kepala tukang OH 0.3330 65,000.00 21,645.00
Mandor OH 0.3180 75,000.00 23,850.00
Jumlah harga per satuan pekerjaan 5,472,545.00

Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Kayu klas III papan m3 0.3200 1,600,000.00 512,000.00


Paku 5-12 cm kg 3.2000 17,000.00 54,400.00
Minyak bekisting Liter 1.6000 25,000.00 40,000.00
Besi beton polos kg 157.5000 12,000.00 1,890,000.00
Kawat beton kg 2.2500 15,000.00 33,750.00
PC m3 336.0000 1,350.00 453,600.00
Bahan
PB m3 0.5400 120,000.00 64,800.00
KR m3 0.8100 250,000.00 202,500.00
Kayu klas II balok m3 0.1200 2,800,000.00 336,000.00
Plywood 9 mm Lembar 2.8000 165,000.00 462,000.00

Dolken kayu Ø 8-10 cm panjang 4 m Batang 32.0000 7,500.00 240,000.00

Pekerja OH 5.3000 55,000.00 291,500.00


Tukang batu OH 0.2750 60,000.00 16,500.00
Tukang kayu OH 1.3000 60,000.00 78,000.00
Tenaga Kerja
Tukang besi OH 1.0500 60,000.00 63,000.00
Kepala tukang OH 0.2620 65,000.00 17,030.00
Mandor OH 0.2650 75,000.00 19,875.00
Jumlah harga per satuan pekerjaan 4,774,955.00

Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Kayu klas III papan m3 0.2500 1,600,000.00 400,000.00


Paku 5-12 cm kg 3.0000 17,000.00 51,000.00
Minyak bekisting Liter 1.2000 25,000.00 30,000.00
Besi beton polos kg 210.0000 12,000.00 2,520,000.00
Kawat beton kg 3.0000 15,000.00 45,000.00
PC m3 336.0000 1,350.00 453,600.00
Bahan
PB m3 0.5400 120,000.00 64,800.00
KR m3 0.8100 250,000.00 202,500.00
Kayu klas II balok m3 0.1050 2,800,000.00 294,000.00
Plywood 9 mm Lembar 2.5000 165,000.00 412,500.00

Dolken kayu Ø 8-10 cm panjang 4 m Batang 14.0000 7,500.00 105,000.00

Pekerja OH 5.6500 55,000.00 310,750.00


Tukang batu OH 0.2750 60,000.00 16,500.00
Tukang kayu OH 1.5600 60,000.00 93,600.00
Tenaga Kerja
Tukang besi OH 1.4000 60,000.00 84,000.00
Kepala tukang OH 0.3230 65,000.00 20,995.00
Mandor OH 0.2830 75,000.00 21,225.00
Jumlah harga per satuan pekerjaan 5,125,470.00

Analisa Harga Satuan


Membuat 1 m3 plat beton bertulang (100 kg besi + bekisting)

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Kayu klas III papan m3 0.2500 1,600,000.00 400,000.00


Paku 5-12 cm kg 3.0000 17,000.00 51,000.00
Minyak bekisting Liter 1.2000 25,000.00 30,000.00
Besi beton polos kg 105.0000 12,000.00 1,260,000.00
Kawat beton kg 3.0000 15,000.00 45,000.00
PC m3 336.0000 1,350.00 453,600.00
Bahan
PB m3 0.5400 120,000.00 64,800.00
KR m3 0.8100 250,000.00 202,500.00
Kayu klas II balok m3 0.1050 2,800,000.00 294,000.00
Plywood 9 mm Lembar 2.5000 165,000.00 412,500.00

Dolken kayu Ø 8-10 cm panjang 4 m Batang 10.0000 7,500.00 75,000.00

Pekerja OH 5.6500 55,000.00 310,750.00


Tukang batu OH 0.2750 60,000.00 16,500.00
Tukang kayu OH 1.0000 60,000.00 60,000.00
Tenaga Kerja
Tukang besi OH 0.7000 60,000.00 42,000.00
Kepala tukang OH 1.9750 65,000.00 128,375.00
Mandor OH 0.2825 75,000.00 21,187.50
Jumlah harga per satuan pekerjaan 3,867,212.50

Membuat 1 m' kolom praktis beton bertulang, ukuran 11 x 11 cm

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Kayu klas III papan m3 0.0020 1,600,000.00 3,200.00


Paku 5-12 cm kg 0.0100 17,000.00 170.00
Besi beton polos kg 3.0000 12,000.00 36,000.00
Bahan Kawat beton kg 0.4500 15,000.00 6,750.00
PC m3 4.0000 1,350.00 5,400.00
PB m3 0.0060 120,000.00 720.00
KR m3 0.0090 250,000.00 2,250.00
Pekerja OH 0.1800 55,000.00 9,900.00
Tukang batu OH 0.0200 60,000.00 1,200.00
Tukang kayu OH 0.0200 60,000.00 1,200.00
Tenaga Kerja
Tukang besi OH 0.0200 60,000.00 1,200.00
Kepala tukang OH 0.0060 65,000.00 390.00
Mandor OH 0.0090 75,000.00 675.00
Jumlah harga per satuan pekerjaan 69,055.00

Membuat 1 m' ring balok beton bertulang, ukuran 10 x 15 cm

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Kayu klas III papan m3 0.0030 1,600,000.00 4,800.00


Paku 5-12 cm kg 0.0200 17,000.00 340.00
Besi beton polos kg 3.6000 12,000.00 43,200.00
Bahan Kawat beton kg 0.0500 15,000.00 750.00
PC m3 5.5000 1,350.00 7,425.00
PB m3 0.0090 120,000.00 1,080.00
KR m3 0.0150 250,000.00 3,750.00
Pekerja OH 0.2970 55,000.00 16,335.00
Tukang batu OH 0.0330 60,000.00 1,980.00
Tukang kayu OH 0.0330 60,000.00 1,980.00
Tenaga Kerja
Tukang besi OH 0.0330 60,000.00 1,980.00
Kepala tukang OH 0.0100 65,000.00 650.00
Mandor OH 0.0150 75,000.00 1,125.00
Jumlah harga per satuan pekerjaan 85,395.00

1 m3 Mengerjakan neut beton 1 PC : 2 PB : 3 KR

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

PC m3 232.0000 1,350.00 313,200.00


Bahan PB m3 0.5200 120,000.00 62,400.00
KR m3 0.8200 250,000.00 205,000.00
Pekerja OH 1.6500 55,000.00 90,750.00
Tukang batu OH 0.2500 60,000.00 15,000.00
Tenaga Kerja
Kepala tukang OH 0.0250 65,000.00 1,625.00
Mandor OH 0.0800 75,000.00 6,000.00
Jumlah harga per satuan pekerjaan 693,975.00

1 m3 Mengerjakan lantai rabat beton 1 PC : 3 PB : 5 KR

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

PC m3 218.0000 1,350.00 294,300.00


Bahan PB m3 0.5200 120,000.00 62,400.00
KR m3 0.7800 250,000.00 195,000.00
Pekerja OH 1.6500 55,000.00 90,750.00
Tukang batu OH 0.2500 60,000.00 15,000.00
Tenaga Kerja
Kepala tukang OH 0.0250 65,000.00 1,625.00
Mandor OH 0.0800 75,000.00 6,000.00
Jumlah harga per satuan pekerjaan 665,075.00

Analisa Harga Satuan


Memasang 1 m2 dinding bata merah ukuran 5 x 11 x 22 cm tebal ½ bata, campuran spesi 1 PC : 5 PP

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Bata merah Buah 70.0000 1,000.00 70,000.00


Bahan PC kg 9.5000 1,350.00 12,825.00
PP m3 0.0450 120,000.00 5,400.00
Pekerja OH 0.3000 55,000.00 16,500.00
Tukang batu OH 0.1000 60,000.00 6,000.00
Tenaga Kerja
Kepala tukang OH 0.0100 65,000.00 650.00
Mandor OH 0.0150 75,000.00 1,125.00
Jumlah harga per satuan pekerjaan 112,500.00

Memasang 1 m2 dinding bata merah ukuran 5 x 11 x 22 cm tebal 1 bata, campuran spesi 1 PC : 3 PP

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Bata merah Buah 140.0000 1,000.00 140,000.00


Bahan PC kg 32.9500 1,350.00 44,482.50
PP m3 0.0910 120,000.00 10,920.00
Pekerja OH 0.6000 55,000.00 33,000.00
Tukang batu OH 0.2000 60,000.00 12,000.00
Tenaga Kerja
Kepala tukang OH 0.0200 65,000.00 1,300.00
Mandor OH 0.0300 75,000.00 2,250.00
Jumlah harga per satuan pekerjaan 243,952.50

Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

PC kg 10.3680 1,350.00 13,996.80


Bahan
PP m3 0.0310 120,000.00 3,720.00
Pekerja OH 0.2600 55,000.00 14,300.00
Tukang batu OH 0.2000 60,000.00 12,000.00
Tenaga Kerja
Kepala tukang OH 0.0200 65,000.00 1,300.00
Mandor OH 0.0130 75,000.00 975.00
Jumlah harga per satuan pekerjaan 46,291.80

Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

PC kg 6.9120 1,350.00 9,331.20


Bahan
PP m3 0.0350 120,000.00 4,200.00
Pekerja OH 0.4000 55,000.00 22,000.00
Tukang batu OH 0.2000 60,000.00 12,000.00
Tenaga Kerja
Kepala tukang OH 0.0200 65,000.00 1,300.00
Mandor OH 0.0220 75,000.00 1,650.00
Jumlah harga per satuan pekerjaan 50,481.20

Memasang 1 m2 acian

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Bahan PC kg 3.2000 1,350.00 4,320.00


Pekerja OH 0.2000 55,000.00 11,000.00
Tukang batu OH 0.1000 60,000.00 6,000.00
Tenaga Kerja
Kepala tukang OH 0.0100 65,000.00 650.00
Mandor OH 0.0100 75,000.00 750.00
Jumlah harga per satuan pekerjaan 22,720.00

Memasang 1 m2 rangka atap (kuda-kuda Trusses 65 C 08) dari bahan baja ringan + Reng 35 B 50 + Circle/resibon
Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)
Kuda-kuda Trusses 65 C 08 + Reng + Resibon m2 1.0000 200,000.00 200,000.00
Bahan
Screw Driver Bh 28.0000 400.00 11,200.00
Pekerja OH 0.2000 55,000.00 11,000.00
Tukang besi OH 0.4500 60,000.00 27,000.00
Tenaga Kerja Kepala tukang OH 0.0100 65,000.00 650.00
Mandor OH 0.0500 75,000.00 3,750.00
Alat Bantu Ls 1.0000 2,000.00 2,000.00
Jumlah harga per satuan pekerjaan 255,600.00

Memasang 1 m2 Atap Seng Galvalum 0,25

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Bahan Seng galvalum 0.30 mm m2 0.8000 115,000.00 92,000.00


Screw Cteks Bh 12.0000 400.00 4,800.00
Pekerja OH 0.1000 55,000.00 5,500.00
Tukang Atap OH 0.0800 60,000.00 4,800.00
Tenaga Kerja
Kepala tukang OH 0.0100 65,000.00 650.00
Mandor OH 0.0060 75,000.00 450.00
Jumlah harga per satuan pekerjaan 108,200.00

Analisa Harga Satuan


Memasang 1 m2 bubungan Nok, Talang Jurai dalam, Jurai Luar dgn seng Licin Galvalum 0.25 mm Lebar 45 cm

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Seng Licin Galvalum 0.25 mm m1 1.2000 25,000.00 30,000.00


Bahan
Screw cteks 10x16-16 Bh 10.0000 400.00 4,000.00
Pekerja OH 0.0200 55,000.00 1,100.00
Tukang Atap OH 0.0800 60,000.00 4,800.00
Tenaga Kerja
Kepala tukang OH 0.0100 65,000.00 650.00
Mandor OH 0.0060 75,000.00 450.00
Jumlah harga per satuan pekerjaan 41,000.00

Memasang 1 m' lisplank dengan Calsiplank, Lebar 20 cm

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Calsiplank lebar 20 cm m1 1.1000 40,000.00 44,000.00


Bahan
Sekrup SDS Bh 4.0000 400.00 1,600.00
Pekerja OH 0.1000 55,000.00 5,500.00
Tukang kayu OH 0.2000 60,000.00 12,000.00
Tenaga Kerja
Kepala tukang OH 0.0200 65,000.00 1,300.00
Mandor OH 0.0050 75,000.00 375.00
Jumlah harga per satuan pekerjaan 64,775.00

1 M2 Pekerjaan mengecat tembok (1 x plamir, 2 x cat)

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Cat tembok kg 0.3700 15,000.00 5,550.00


Bahan Plamir tembok kg 0.1000 15,000.00 1,500.00
Amplas Lembar 1.0000 6,000.00 6,000.00
Pekerja OH 0.0200 55,000.00 1,100.00
Tukang OH 0.0630 60,000.00 3,780.00
Tenaga Kerja
Kepala tukang OH 0.0063 65,000.00 409.50
Mandor OH 0.0025 75,000.00 12,789.50
Jumlah harga per satuan pekerjaan 31,129.00

1 M2 Pekerjaan mengecat Dinding bak dengan cat Aqua proof ( 2 x cat )

Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp)
Upah/Bahan (Rp)

Bahan Cat Aqua proof kg 0.3700 50,000.00 18,500.00


Pekerja OH 0.1500 55,000.00 8,250.00
Tenaga Kerja Tukang besi OH 0.0230 60,000.00 1,380.00
Kepala tukang OH 0.0250 65,000.00 1,625.00
Mandor OH 0.0080 75,000.00 11,255.00
Jumlah harga per satuan pekerjaan 41,010.00

Analisa Harga Satuan


HARGA SATUAN UPAH DAN BAHAN
PROGRAM : PENGEMBANGAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS DAN JARINGANNYA

KEGIATAN : PENGADAAN SARANA DAN PRASARANA AIR BERSIH PUSKESMAS

PEKERJAAN : BELANJA MODAL PENGADAAN SUMUR BOR DAN JARINGAN PERPIPAAN UNTUK PUSKESMAS WEOE

LOKASI : PUSKESMAS WEOE

TAHUN ANGGARAN : 2020

HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
( Rp )
1 2 3 4 5

A. UPAH

1 Tukang (batu, kayu, besi) Org / Hari 60,000.00

2 Kepala tukang Org / Hari 65,000.00

3 Pekerja Org / Hari 55,000.00

4 Mandor Org / Hari 75,000.00

MERK HARGA SATUAN


NO URAIAN SATUAN
(KUALITAS SETARA) ( Rp )
1 2 3 4 5

B. BAHAN LOKAL

1 Sirtu M3 - 100,000.00

2 Tanah urug M 3
- 80,000.00

3 Pasir urug M3 - 90,000.00

4 Pasir pasang (PP) / Pasir Beton (PB) M 3


- 120,000.00
5 Batu kali M3 - 138,000.00

6 Batu pecah 2/3 (KR) M 3


- 250,000.00

7 Kerikil M3 - 160,000.00

8 Kayu balok klas I lokal M 3


Jati 3,000,000.00

9 Kayu balok klas I (non lokal) M3 Bayam 10,500,000.00

10 Kayu balok klas II lokal M3 Jambu air, Nitas, Kenari dll 2,800,000.00

11 Papan kayu klas I lokal M3 Jati 3,500,000.00

12 Papan kayu klas II lokal M 3


Jambu air, Nitas, Kenari dll 2,800,000.00

13 Papan begesting kayu klas III M3 - 1,600,000.00

14 Kayu bulat/perancah M 3
- 1,200,000.00

15 Kayu dolken Ø 8 /400 cm Btg - 7,500.00

16 Batu merah Bh - 1,000.00

C. BAHAN NON LOKAL

1 Portland cement (PC) Kg SNI 1,350.00

2 Pc warna Kg - 10,000.00

3 Besi beton Kg Polos 12,000.00

4 Besi beton Kg Ulir 15,000.00

5 Kawat ikat beton Kg - 15,000.00


6 Besi Beugel/strip Kg - 25,000.00

10 Kuda-kuda Baja ringan 65 C 08 + Reng + Cirrcle/Resibon M 2


Galvasteel 200,000.00

11 Self driling screw Bh - 400.00


11 Seng Galvalume Sheet 0.30 (Panjang 6 m) Lbr - 115,000.00

12 Kerpus/Nok Galvalume 0.20 mm m1 - 25,000.00

12 Seng Gelombang BJLS 0,20 mm Lbr - 48,000.00

13 Seng Plat BJLS 0,30 lebar 45 cm M1 - 35,000.00

13 Seng Plat warna BJLS 0,30 lebar 45 cm M 1


- 37,500.00

14 Cat warna Kg - 55,000.00

15 Cat meni untuk kayu Kg - 45,000.00

16 Cat meni untuk besi Kg - 45,000.00

17 Cat Aqua Proof Kg - 50,000.00

18 Flingkoat Kg - 45,000.00

19 Cat seng Kg - 45,000.00

20 Minyak Begesting Ltr - 25,000.00

21 Thinner Ltr - 35,000.00

22 Ampelas Lbr - 6,000.00

HARGA SATUAN UPAH BAHAN 9


23 Lem kayu Lbr - 30,000.00

24 Cat tembok Kg - 15,000.00

25 Calsiplank lebar 30 cm M 1
Wodddplank 40,000.00

26 Plywood 9 mm Lbr - 165,000.00

27 Plywood 4 mm Lbr - 72,000.00

28 Teak wood Lbr - 100,000.00

29 Paku 5-12 cm Kg - 17,000.00

30 Skrup Bh - 500.00

31 Pintu Fabrikasi Bh - 500,000.00


32 Paku seng Kg - 27,500.00

33 Paku klem / sekrup Bh - 350.00

34 Paku plafond/tripleks Kg - 22,500.00


35 Plamir Kg - 15,000.00
MERK HARGA SATUAN
NO URAIAN SATUAN
(KUALITAS SETARA) ( Rp )
1 2 3 4 5

D BAHAN INSTALASI LISTRIK

1 MCB 2 group Bh - 95,000.00

2 Tiang penyangga kabel dari pipa Dia 2" ( tinggi 3 m ) Titik 250,000.00

3 Meteran Listrik Daya 1300 Watt Bh - 3,500,000.00