I. PEKERJAAN PONDASI Rp 7,861,885.93
II. PEKERJAAN STRUKTUR Rp 7,789,402.66
III. PEKERJAAN LANTAI Rp 4,918,544.15
IV. PEKERJAAN DINDING PAGAR Rp 13,374,484.85
V. PEKERJAAN PENGECATAN Rp 1,287,726.88
JUMLAH Rp 35,232,044.48
DIBULATKAN Rp 35,232,000.00
TERBILANG : TIGA PULUH LIMA JUTA DUA RATUS TIGA PULUH DUA RIBU RUPIAH
NO URAIAN
a b
I. PEKERJAAN PONDASI
1 Galian Tanah Pondasi
2 Pengadaan Cerucuk Ø 10 Panjang 4 m¹
3 Urugan Pasir Pondasi T = 10 cm
4 Lantai Kerja K-100 (Manual) T = 5 cm
5 Pekerjaan Tapak Pondasi Footplate 60 x 60 cm
a. Bekisting Tapak Pondasi
b. Tul. Pokok Ø 10 mm - 170 mm
c. Beton K-175 (Manual)
6 Pekerjaan Kolom Pondasi uk. 15 x 15 cm
a. Bekisting Kolom
b. Tul. Utama 4 x Ø 10 mm
c. Beugel Tul. Ø 6 mm - 170 mm
d. Beton K-175 (Manual)
a b
NGGAL T. 80
c d e f g=dxf
7,861,885.93
c d e f g=dxf
7,789,402.66
4,918,544.15
13,374,484.85
1,287,726.88
35,232,044.48
35,232,000.00
NO. URAIAN PEKERJAAN PERHITUNGAN V
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Pekerjaan 1.00
I. PEKERJAAN PONDASI
A. Pondasi 1 (P1) Jumlah Pondasi = 17.00
1 Galian Tanah Pondasi Panjang Lebar Tinggi
0.60 x 0.60 x 0.80 =
Jumlah Total
V. PEKERJAAN ATAP
b. Daun Jendela Kayu Kls. II + Kaca Tebal 5 mm 1 Daun Byk 1 Jendela Hasil
1.00 x 6.00 = 6.00
b. Daun Jendela Kayu Kls. II + Kaca Tebal 5 mm 1 Daun Byk 1 Jendela Hasil
2.00 x 2.00 = 4.00
4.00
Banyak Hasil = 3.60 3.60 M2
4.00 = 3.60
4.00
Banyak Hasil = 5.40 5.40 M2
4.00 = 5.40
l 5.40
15.00
Banyak Jumlah B.J. Ø 8 mm Hasil = 26.63 26.63 Kg
15.00 = 67.50 x 0.39 = 26.63
= 18.70 18.70
4.20 +
- +
12.84
= 42.46 42.46 M2
= 5.60
= 4.50
1.35
PERHITUNGAN VOLUME VOLUME SATUAN
= 22.62 22.62 M2
= 32.10 32.10 M2
= 32.10 32.10 M2
= 4.00 4.00 Bh
= 4.00 4.00 Bh
= 8.00 8.00 Bh
= 15.00 15.00 Bh
= #REF! #REF! Bh
= #REF! #REF! Bh
= #REF! #REF! Bh
= #REF! #REF! Bh
= 12.00 12.00 Bh
= 12.00 12.00 Bh
= 6.00 6.00 Bh
= 12.00 12.00 Bh
= 8.00 8.00 Bh
= 8.00 8.00 Bh
= 4.00 4.00 Bh
= 8.00 8.00 Bh
= 26.85 26.85 M2
PERHITUNGAN VOLUME VOLUME SATUAN
= 5.25 5.25 M2
= 50.00 M1
= 11.00 Btg
= 12.00 Bh
= 5.00 Bh
= 4.00 Bh
= 5.00 Bh
= 17.00 Titik
= 12.00 Bh
2.00
Jml. Sisi Jumlah Jumlah Hasil = 5.12 5.12 M2
4.00 = 2.56 x 2.00 = 5.12
= 30.72 30.72 M2
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
Divisi 2 2.2.1
Pekerjaan Persiapan
A.2.2.1.1 1
A.2.2.1.2 2
A.2.2.1.3 3
A.2.2.1.4 4
A.2.2.1.4.a 4.a.
A.2.2.1.5 5
A.2.2.1.6 6
A.2.2.1.7 7
A.2.2.1.8 8
A.2.2.1.9 9
A.2.2.1.10 10
A.2.2.1.11 11
A.2.2.1.12 12
A.2.2.1.13 13
A.2.2.1.14 14
A.2.2.1.15 15
A.2.2.1.16 16
Divisi 2 2.3.1
Pekerjaan Tanah
A.2.3.1.1 1
A.2.3.1.2 2
A.2.3.1.3 3
A.2.3.1.4 4
A.2.3.1.5 5
A.2.3.1.6 6
A.2.3.1.7 7
A.2.3.1.8 8
A.2.3.1.9 9
ABK. PT. 11
A.2.3.1.10 10
A.2.3.1.11 11
A.2.3.1.12 12
A.2.3.1.13 13
A.2.3.1.14 14
Divisi 3 3.2.1
Pekerjaan Pondasi
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.3.2.1.1 1
A.3.2.1.2 2
A.3.2.1.3 3
A.3.2.1.4 4
A.3.2.1.5 5
A.3.2.1.6 6
A.3.2.1.7 7
A.3.2.1.8 8
A.3.2.1.9 9
A.3.2.1.10 10
A.3.2.1.11 11
Divisi 4 4.1.1
Pekerjaan Beton
A.4.1.1.1 1
A.4.1.1.1.a 1.a.
A.4.1.1.2 2
A.4.1.1.2.a 2.a.
A.4.1.1.3 3
A.4.1.1.3.a 3.a
A.4.1.1.4 4
A.4.1.1.4.a 4.a.
A.4.1.1.5 5
A.4.1.1.5.a 5.a.
A.4.1.1.6 6
A.4.1.1.6.a 6.a
A.4.1.1.7 7
A.4.1.1.7.a 7.a.
B.13.a. B.13.a.
A.4.1.1.8 8
A.4.1.1.8.a 8.a.
A.4.1.1.9 9
A.4.1.1.9.a 9.a.
A.4.1.1.10 10
A.4.1.1.10.a 10.a.
A.4.1.1.11 11
A.4.1.1.11.a 11.a.
A.4.1.1.12 12
A.4.1.1.12.a 12.a.
A.4.1.1.13 13
A.4.1.1.14 14
A.4.1.1.15 15
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.4.1.1.16 16
A.4.1.1.17 17
A.4.1.1.18 18
A.4.1.1.19 19
A.4.1.1.20 20
A.4.1.1.20.a 20.a
A.4.1.1.21 21
A.4.1.1.21.a 21.a.
A.4.1.1.22 22
A.4.1.1.22.a 22.a.
A.4.1.1.22.a.1 22.a.1.
A.4.1.1.23 23
A.4.1.1.23.a 23.a.
A.4.1.1.23.a.1 23.a.1.
A.4.1.1.24 24
A.4.1.1.24.a 24.a.
A.4.1.1.24.a.1 24.a.1.
A.4.1.1.25 25
A.4.1.1.26 26
B.22.a B.22.a.
B.22.b B.22.b.
B.22.c B.22.c.
A.4.1.1.27 27
A.4.1.1.28 28
A.4.1.1.29 29
A.4.1.1.30 30
A.4.1.1.31 31
A.4.1.1.32 32
A.4.1.1.33 33
A.4.1.1.34 34
A.4.1.1.35 35
A.4.1.1.36 36
Divisi 4 4.1.2
Pekerjaan Beton Pracetak
A.4.1.2.1 1
A.4.1.2.2 2
A.4.1.2.3 3
A.4.1.2.4 4
A.4.1.2.5 5
A.4.1.2.6 6
A.4.1.2.7 7
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.4.1.2.8 8
A.4.1.2.9 9
A.4.1.2.10 10
A.4.1.2.11 11
A.4.1.2.12 12
A.4.1.2.13 13
A.4.1.2.14 14
A.4.1.2.15 15
A.4.1.2.16 16
A.4.1.2.17 17
A.4.1.2.18 18
A.4.1.2.19 19
A.4.1.2.20 20
A.4.1.2.21 21
A.4.1.2.22 22
A.4.1.2.23 23
A.4.1.2.24 24
Divisi 4 4.2.1
Pekerjaan Besi & Aluminium
A.4.2.1.1 1
A.4.2.1.2 2
A.4.2.1.3 3
A.4.2.1.4 4
A.4.2.1.5 5
A.4.2.1.6 6
A.4.2.1.7 7
A.4.2.1.8 8
A.4.2.1.9 9
A.4.2.1.10 10
A.4.2.1.11 11
A.4.2.1.12 12
A.4.2.1.13 13
A.4.2.1.14 14
A.4.2.1.15 15
A.4.2.1.16 16
A.4.2.1.17 17
A.4.2.1.18 18
A.4.2.1.19 19
A.4.2.1.20 20
A.4.2.1.21 21
Divisi 4 4.4.1
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.4.4.2.13 13
A.4.4.2.14 14
A.4.4.2.15 15
A.4.4.2.16 16
A.4.4.2.17 17
A.4.4.2.18 18
A.4.4.2.19 19
A.4.4.2.20 20
A.4.4.2.21 21
A.4.4.2.22 22
A.4.4.2.23 23
A.4.4.2.24 24
A.4.4.2.25 25
A.4.4.2.26 26
A.4.4.2.27 27
ABK.SNI.P.Pls.09
Divisi 4 4.4.3
Pekerjaan Penutup Lantai & Penutup Dinding
A.4.4.3.1 1
A.4.4.3.2 2
A.4.4.3.3 3
A.4.4.3.4 4
A.4.4.3.4.a 4.a.
A.4.4.3.5 5
A.4.4.3.6 6
A.4.4.3.7 7
A.4.4.3.8 8
A.4.4.3.9 9
A.4.4.3.10 10
A.4.4.3.11 11
A.4.4.3.12 12
A.4.4.3.13 13
A.4.4.3.14 14
A.4.4.3.15 15
A.4.4.3.16 16
A.4.4.3.17 17
A.4.4.3.18 18
A.4.4.3.19 19
A.4.4.3.20 20
A.4.4.3.21 21
A.4.4.3.22 22
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.4.4.3.23 23
A.4.4.3.24 24
A.4.4.3.25 25
A.4.4.3.26 26
A.4.4.3.27 27
A.4.4.3.28 28
A.4.4.3.29 29
A.4.4.3.30 30
A.4.4.3.31 31
A.4.4.3.32 32
A.4.4.3.33 33
A.4.4.3.34 34
A.4.4.3.35 35
A.4.4.3.36 36
A.4.4.3.37 37
A.4.4.3.38 38
A.4.4.3.39 39
A.4.4.3.40 40
A.4.4.3.41 41
A.4.4.3.42 42
A.4.4.3.43 43
A.4.4.3.44 44
A.4.4.3.45 45
A.4.4.3.46 46
A.4.4.3.47 47
A.4.4.3.48 48
A.4.4.3.49 49
A.4.4.3.50 50
A.4.4.3.51 51
A.4.4.3.52 52
A.4.4.3.53 53
A.4.4.3.54 54
A.4.4.3.54.a 54.a.
A.4.4.3.55 55
A.4.4.3.56 56
A.4.4.3.57 57
A.4.4.3.58 58
A.4.4.3.59 59
A.4.4.3.60 60
A.4.4.3.61 61
A.4.4.3.62 62
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.4.4.3.63 63
Divisi 4 4.5.1
Pekerjaan Plafond
A.4.5.1.1 1
A.4.5.1.2 2
A.4.5.1.3 3
A.4.5.1.4 4
A.4.5.1.5 5
A.4.5.1.6 6
A.4.5.1.7 7
A.4.5.1.7.a 7.a.
A.4.5.1.8 8
A.4.5.1.9 9
A.4.5.1.10 10
Divisi 4 4.5.2
Pekerjaan Penutup Atap
A.4.5.2.1 1
A.4.5.2.2 2
A.4.5.2.3 3
A.4.5.2.4 4
A.4.5.2.5 5
A.4.5.2.6 6
A.4.5.2.7 7
A.4.5.2.8 8
A.4.5.2.9 9
A.4.5.2.10 10
A.4.5.2.11 11
A.4.5.2.12 12
A.4.5.2.13 13
A.4.5.2.14 14
A.4.5.2.15 15
A.4.5.2.16 16
A.4.5.2.17 17
A.4.5.2.18 18
A.4.5.2.19 19
A.4.5.2.20 20
A.4.5.2.21 21
A.4.5.2.22 22
A.4.5.2.23 23
A.4.5.2.24 24
A.4.5.2.25 25
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.4.5.2.26 26
A.4.5.2.27 27
A.4.5.2.28 28
A.4.5.2.29 29
A.4.5.2.30 30
A.4.5.2.31 31
A.4.5.2.32 32
A.4.5.2.32.a 32.a.
A.4.5.2.32.a.1 32.a.1
A.4.5.2.32.b 32.b.
A.4.5.2.32.b.1 32.b.1
A.4.5.2.32.c 32.c.
A.4.5.2.32.c.1 32.c.1
A.4.5.2.32.d 32.d.
A.4.5.2.33 33
A.4.5.2.34 34
A.4.5.2.35 35
A.4.5.2.36 36
A.4.5.2.37 37
A.4.5.2.38 38
A.4.5.2.39 39
A.4.5.2.39.a 39.a
A.4.5.2.40 40
A.4.5.2.41 41
A.4.5.2.42 42
ABK.SNI.P.PA.07
Divisi 4 4.6.1
Pekerjaan Kayu
A.4.6.1.1 1
A.4.6.1.2 2
A.4.6.1.3 3
A.4.6.1.4 4
A.4.6.1.5 5
A.4.6.1.5.a 5.a.
A.4.6.1.5.b 5.b.
A.4.6.1.6 6
A.4.6.1.6.a 6.a.
A.4.6.1.7 7
A.4.6.1.8 8
A.4.6.1.9 9
A.4.6.1.10 10
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.4.6.1.11 11
A.4.6.1.12 12
A.4.6.1.13 13
A.4.6.1.14 14
A.4.6.1.15 15
A.4.6.1.15.a 15.a.
A.4.6.1.15.b 15.b.
A.4.6.1.16 16
A.4.6.1.16.a 16.a
A.4.6.1.17 17
A.4.6.1.18 18
A.4.6.1.19 19
A.4.6.1.20 20
A.4.6.1.20.a 20.a.
A.4.6.1.21 21
A.4.6.1.22 22
A.4.6.1.22.a 22.a
A.4.6.1.22.b 22.b.
A.4.6.1.23 23
A.4.6.1.24 24
A.4.6.1.25 25
A.4.6.1.26 26
A.4.6.1.27 27
A.4.6.1.27.a 27.a
A.4.6.1.28 28
ABK.SNI.P.K.01
ABK.SNI.P.K.01.a
ABK.SNI.P.K.01.b
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
ABK.SNI.P.K.01.c
ABK.SNI.P.K.05
ABK.SNI.P.K.06
ABK.SNI.P.K.07.a
ABK.SNI.P.K.08.a
ABK.SNI.P.K.09
ABK.SNI.P.K.09.a
ABK.SNI.P.K.10
ABK.SNI.P.K.10.a
ABK.SNI.P.K.11
ABK.SNI.P.K.50
Divisi 4 4.6.2
Pekerjaan Kunci & Kaca
A.4.6.2.1 1
A.4.6.2.1.a 1.a.
A.4.6.2.2 2
A.4.6.2.3 3
A.4.6.2.4 4
A.4.6.2.5 5
A.4.6.2.6 6
A.4.6.2.7 7
A.4.6.2.8 8
A.4.6.2.9 9
A.4.6.2.10 10
A.4.6.2.11 11
A.4.6.2.11.a 11.a.
A.4.6.2.12 12
A.4.6.2.13 13
A.4.6.2.14 14
A.4.6.2.15 15
A.4.6.2.16 16
A.4.6.2.17 17
A.4.6.2.17.a 17.a.
A.4.6.2.17.b 17.b.
A.4.6.2.18 18
A.4.6.2.19 19
A.4.6.2.20 20
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.4.6.2.21 21
A.4.6.2.22 22
A.4.6.2.23 23
Divisi 4 4.7.1
Pekerjaan Pengecatan
A.4.7.1.1 1
A.4.7.1.2 2
A.4.7.1.3 3
A.4.7.1.4 4
A.4.7.1.4.a 4.a.
A.4.7.1.5 5
A.4.7.1.6 6
A.4.7.1.7 7
A.4.7.1.8 8
A.4.7.1.9 9
A.4.7.1.10 10
A.4.7.1.10.a 10.a.
A.4.7.1.11 11
A.4.7.1.11.a 11.a.
A.4.7.1.12 12
A.4.7.1.13 13
A.4.7.1.14 14
A.4.7.1.15 15
A.4.7.1.16 16
A.4.7.1.17 17
A.4.7.1.18 18
A.4.7.1.19 19
A.4.7.1.20 20
A.4.7.1.21 21
Divisi 5 5.1.1
Pekerjaan Sanitasi Gedung
A.5.1.1.1 1
A.5.1.1.2 2
A.5.1.1.3 3
A.5.1.1.4 4
A.5.1.1.5 5
A.5.1.1.6 6
A.5.1.1.7 7
A.5.1.1.8 8
A.5.1.1.9 9
A.5.1.1.10 10
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.5.1.1.11 11
A.5.1.1.12 12
A.5.1.1.13 13
A.5.1.1.14 14
A.5.1.1.15 15
A.5.1.1.16 16
A.5.1.1.17 17
A.5.1.1.18 18
A.5.1.1.19 19
A.5.1.1.20 20
A.5.1.1.21 21
A.5.1.1.22 22
A.5.1.1.23 23
A.5.1.1.24 24
A.5.1.1.25 25
A.5.1.1.26 26
A.5.1.1.27 27
A.5.1.1.28 28
A.5.1.1.29 29
A.5.1.1.30 30
A.5.1.1.31 31
A.5.1.1.32 32
A.5.1.1.33 33
A.5.1.1.34 34
A.5.1.1.35 35
A.5.1.1.36 36
Divisi 8 8.4.1
Pekerjaan Pemasangan Pipa
A.8.4.1.1 1
A.8.4.1.2 2
A.8.4.1.3 3
A.8.4.1.4 4
A.8.4.1.5 5
A.8.4.1.6 6
A.8.4.1.7 7
A.8.4.1.8 8
A.8.4.1.9 9
A.8.4.1.10 10
A.8.4.1.11 11
A.8.4.1.12 12
A.8.4.1.13 13
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.8.4.1.14 14
A.8.4.1.15 15
A.8.4.1.16 16
A.8.4.1.17 17
A.8.4.1.18 18
A.8.4.1.19 19
A.8.4.1.20 20
A.8.4.1.21 21
A.8.4.1.22 22
A.8.4.1.23 23
A.8.4.1.24 24
A.8.4.1.25 25
A.8.4.1.26 26
A.8.4.1.27 27
A.8.4.1.28 28
A.8.4.1.29 29
A.8.4.1.30 30
A.8.4.1.31 31
A.8.4.1.32 32
A.8.4.1.33 33
A.8.4.1.34 34
A.8.4.1.35 35
A.8.4.1.36 36
A.8.4.1.37 37
A.8.4.1.38 38
A.8.4.1.39 39
A.8.4.1.40 40
A.8.4.1.41 41
A.8.4.1.42 42
A.8.4.1.43 43
A.8.4.1.44 44
A.8.4.1.45 45
A.8.4.1.46 46
A.8.4.1.47 47
A.8.4.1.48 48
A.8.4.1.49 49
A.8.4.1.50 50
A.8.4.1.51 51
A.8.4.1.52 52
A.8.4.1.53 53
A.8.4.1.54 54
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.8.4.1.55 55
A.8.4.1.56 56
A.8.4.1.57 57
A.8.4.1.58 58
A.8.4.1.59 59
A.8.4.1.60 60
A.8.4.1.61 61
A.8.4.1.62 62
A.8.4.1.63 63
A.8.4.1.64 64
A.8.4.1.65 65
A.8.4.1.66 66
A.8.4.1.67 67
A.8.4.1.68 68
A.8.4.1.69 69
A.8.4.1.70 70
A.8.4.1.71 71
A.8.4.1.72 72
A.8.4.1.73 73
A.8.4.1.74 74
A.8.4.1.75 75
A.8.4.1.76 76
A.8.4.1.77 77
A.8.4.1.78 78
A.8.4.1.79 79
Divisi 8 8.4.2
Pemotongan Pipa
1
2
3
4
5
6
7
8
9
10
11
12
13
14
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
Divisi 8 8.4.3
Pemasangan Aksesoris Pipa
A.8.4.3.1 1
A.8.4.3.2 2
A.8.4.3.3 3
A.8.4.3.4 4
A.8.4.3.5 5
A.8.4.3.6 6
A.8.4.3.7 7
A.8.4.3.8 8
A.8.4.3.9 9
A.8.4.3.10 10
A.8.4.3.11 11
A.8.4.3.12 12
A.8.4.3.13 13
A.8.4.3.14 14
A.8.4.3.15 15
KELOMPOK
LEVEL 1 JENIS PEKERJ
PEKERJAAN (LEVEL 2)
A.8.4.3.16 16
A.8.4.3.17 17
A.8.4.3.18 18
A.8.4.3.19 19
A.8.4.3.20 20
A.8.4.3.21 21
A.8.4.3.22 22
A.8.4.3.23 23
A.8.4.3.24 24
A.8.4.3.25 25
A.8.4.3.26 26
A.8.4.3.27 27
A.8.4.3.28 28
Divisi 8 8.4.4
Penyambungan Pipa
A.8.4.4.1 1
A.8.4.4.2 2
A.8.4.4.3 3
A.8.4.4.4 4
A.8.4.4.5 5
A.8.4.4.6 6
A.8.4.4.7 7
A.8.4.4.8 8
A.8.4.4.9 9
A.8.4.4.10 10
A.8.4.4.11 11
A.8.4.4.12 12
Divisi 8 8.4.5
Pengetesan Pipa
A.8.4.5.1 1
A.8.4.5.2 2
A.8.4.5.3 3
A.8.4.5.4 4
A.8.4.5.5 5
A.8.4.5.6 6
A.8.4.5.7 7
A.8.4.5.8 8
A.8.4.5.9 9
A.8.4.5.10 10
LINGKUP PEKERJAAN BERDASARKAN SUB LEVEL 2
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, TopanganAngin dan
Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 4/8
Pembuatan dan Pemasangan 1 m³ rangka badan, kayu belian Uk. 7/7 cm
Pembuatan dan Pemasangan 1 m³ rangka badan, kayu belian Uk. 8/8 cm
Pembuatan dan Pemasangan 1 m³ rangka badan, kayu kls.II Uk. 7/7 cm
Pembuatan dan Pemasangan 1 m³ rangka badan, kayu kls.II Uk. 8/8 cm
1m1 Melancip Tiang / Batang
1m' Melancip Tiang / Batang
Membuat Puting dan Lobang / Pasang
Membuat Puting dan Lobang / Pasang
1 m' Memancang Tiang ke Dalam Tanah
1m2 Pemasangan Lantai Papan Kayu Belian
1m2 Pemasangan Ventilasi KacaSetiap luas 1 m2 bidang daun ventilasi, luas kacanya adalah 0.60 m2
Pengetesan 1 m pipa Ø 50 mm
Pengetesan 1 m pipa Ø 75 mm
Pengetesan 1 m pipa Ø 100 mm
Pengetesan 1 m pipa Ø 150 mm
Pengetesan 1 m pipa Ø 200 mm
Pengetesan 1 m pipa Ø 250 mm
Pengetesan 1 m pipa Ø 300 mm
Pengetesan 1 m pipa Ø 400 mm
Pengetesan 1 m pipa Ø 500 mm
Pengetesan 1 m pipa Ø 600 mm
DASARKAN SUB LEVEL 2
HARGA (Rp.)
334,599.00
386,889.00
460,354.00
411,498.00
41,698.00
1,403,522.00
1,252,590.00
1,138,935.00
1,206,105.00
15,500.00
354,375.00
102,992.00
180,195.00
1,346,650.00
673,325.00
13,481.42
187,475.00
74,250.00
90,900.00
107,790.00
98,840.00
149,700.00
119,400.00
5,350.00
32,550.00
53,500.00
350,000.00
53,500.00
131,700.00
168,400.00
16,050.00
26,750.00
HARGA (Rp.)
957,425.00
901,900.00
863,440.00
836,385.00
799,340.00
642,355.00
746,520.00
719,155.00
533,280.00
2,471,500.00
983,425.00
928,330.71
884,685.71
964,443.28
929,548.28
998,664.05
963,769.05
849,114.15
825,084.15
1,040,351.75
1,005,456.75
1,078,183.62
1,043,288.62
1,109,420.79
1,074,525.79
1,654,180.00
1,126,186.14
1,091,291.14
1,154,848.57
1,119,953.57
1,163,684.95
1,128,789.95
1,252,052.65
1,215,042.65
1,263,592.72
1,226,582.72
1,215,600.00
9,720.00
11,820.00
HARGA (Rp.)
12,960.00
12,997.00
124,510.00
13,266.50
164,210.00
146,010.00
173,460.00
131,835.00
325,210.00
262,630.00
188,755.00
333,983.20
268,180.00
191,530.00
356,010.00
295,230.00
202,440.96
329,532.00
306,694.00
170,996.00
139,766.00
138,596.00
84,620.00
3,837,868.00
4,657,212.00
7,689,020.00
6,011,828.00
5,313,770.00
5,225,146.00
5,612,166.00
80,209.00
102,078.00
83,242.54
104,078.17
114,303.81
156,114.76
Err:509
Err:509
Err:509
HARGA (Rp.)
8,546.00
13,874.00
11,210.00
59,840.00
61,555.00
55,365.00
111,014.58
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
53,690.00
82,608.60
70,620.00
31,630.50
37,185.00
115,552.00
Err:509
30,288.80
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,111,119.20
152,733.60
Err:509
232,198.50
181,434.00
Err:509
Err:509
HARGA (Rp.)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
82,145.00
81,695.00
Err:509
Err:509
Err:509
73,216.00
65,636.00
62,219.00
60,000.00
58,586.00
57,519.00
56,884.00
56,249.00
Err:509
Err:509
Err:509
Err:509
HARGA (Rp.)
87,783.00
68,847.00
80,240.00
78,383.00
76,932.00
Err:509
34,406.00
58,735.00
Err:509
Err:509
48,980.36
29,082.00
13,860.00
59,130.00
37,275.00
150,140.00
59,145.00
59,445.00
63,285.00
73,445.00
199,631.67
135,945.00
144,285.00
124,145.00
135,945.00
124,145.00
135,945.00
124,145.00
135,945.00
132,105.00
124,145.00
135,945.00
22,945.00
22,245.00
22,245.00
23,195.00
23,195.00
27,095.00
27,095.00
HARGA (Rp.)
23,195.00
23,195.00
23,195.00
23,195.00
23,195.00
23,195.00
23,195.00
23,195.00
59,420.00
267,010.00
289,510.00
147,330.00
238,073.73
225,375.00
236,815.00
257,058.18
25,490.00
25,765.00
24,375.50
170,375.00
380,460.00
43,955.00
32,745.00
123,660.00
123,660.00
193,980.00
196,543.60
258,280.00
191,530.00
193,180.00
191,530.00
238,376.00
228,980.00
507,685.00
320,285.00
134,000.00
134,000.00
39,495.00
59,055.00
458,760.00
19,208.00
HARGA (Rp.)
61,319.90
12,051.00
27,665.00
27,665.00
23,205.00
67,843.00
178,581.00
46,265.00
44,350.60
111,500.00
19,467.75
24,360.00
24,420.00
24,420.00
77,360.00
77,360.00
77,360.00
23,345.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
HARGA (Rp.)
Err:509
Err:509
Err:509
Err:509
32,997.00
54,157.00
87,728.00
129,876.00
102,276.00
176,652.02
97,544.00
170,553.80
94,268.00
120,350.00
51,210.00
134,715.00
44,090.00
95,205.00
71,605.00
64,638.00
44,196.00
90,404.00
107,070.00
137,500.00
76,540.00
83,766.50
19,810,975.00
7,391,615.00
419,597.00
236,505.00
923,082.00
1,005,642.00
730,642.00
647,249.20
531,785.20
1,191,601.20
603,479.50
777,167.48
1,022,133.00
HARGA (Rp.)
659,034.50
570,719.50
6,373,110.00
21,465,340.00
8,230,230.00
7,708,280.00
7,357,270.00
71,165.00
69,175.00
310,519.40
71,784.30
112,109.00
112,875.50
91,930.00
157,323.64
158,566.30
61,004.20
87,508.40
154,978.20
211,003.40
327,173.40
363,493.10
55,900.00
41,130.00
16,200.00
14,354,890.00
12,559,910.00
14,413,300.00
HARGA (Rp.)
15,130,940.00
16,856,530.00
17,909,670.00
8,424,470.00
8,223,940.00
40,600.00
10,150.00
73,200.00
18,300.00
90,520.00
604,535.20
126,760.00
258,360.00
117,550.00
61,835.00
122,635.00
38,121.00
23,910.00
33,960.00
20,685.00
31,085.00
237,210.00
43,420.00
32,820.00
66,110.00
66,250.00
79,260.00
33,031.00
25,166.00
184,666.00
179,321.00
275,185.00
260,946.00
40,514.00
20,685.00
HARGA (Rp.)
23,435.00
20,685.00
31,250.00
15,665.00
14,610.00
15,210.00
45,753.40
37,216.40
60,942.40
18,650.00
44,693.20
29,120.00
41,220.00
62,048.00
30,328.00
44,182.40
22,222.40
8,144.00
14,952.00
5,270.00
26,600.00
31,625.00
57,346.00
68,780.00
30,776.00
147,429.20
138,717.00
1,779,652.00
267,050.00
476,750.00
232,850.00
308,550.00
98,985.00
894,000.00
1,145,100.00
894,000.00
85,200.00
HARGA (Rp.)
835,660.00
41,250.00
103,000.00
28,750.00
416,370.00
603,500.00
695,190.00
55,426.25
38,487.50
65,191.25
73,522.50
128,261.25
266,893.75
399,612.50
19,156.25
21,481.25
26,480.00
16,470.00
42,238.75
24,645.00
68,820.00
97,378.75
67,840.00
12,780.00
35,360.00
88,060.00
13,165.00
15,180.00
17,125.00
19,140.00
30,685.00
41,520.00
47,580.00
88,080.00
108,445.00
131,125.00
155,125.00
262,140.00
273,985.00
HARGA (Rp.)
307,105.00
340,105.00
373,105.00
5,555.00
6,480.00
7,405.00
10,020.00
16,500.00
21,565.00
27,540.00
46,980.00
58,225.00
70,055.00
82,920.00
144,575.00
219,205.00
268,825.00
294,540.00
383,940.00
55,775.00
64,800.00
72,600.00
82,020.00
129,000.00
153,805.00
155,220.00
196,320.00
219,095.00
238,045.00
215,065.00
376,955.00
424,945.00
471,625.00
518,400.00
565,080.00
63,115.00
70,555.00
79,085.00
110,235.00
122,645.00
125,525.00
HARGA (Rp.)
213,195.00
255,335.00
293,005.00
303,335.00
571,795.00
733,245.00
896,015.00
1,015,405.00
1,173,200.00
64,405.00
74,725.00
83,660.00
91,400.00
143,585.00
170,985.00
182,475.00
305,240.00
287,765.00
313,660.00
284,900.00
502,705.00
479,995.00
631,395.00
694,915.00
760,135.00
755.00
2,220.00
3,540.00
628,355.00
13,055.00
20,760.00
24,995.00
53,665.00
68,040.00
72,940.00
100,835.00
176,485.00
184,885.00
208,285.00
HARGA (Rp.)
231,565.00
254,845.00
5,424.00
11,670.00
15,925.00
20,790.00
32,730.00
43,985.00
55,230.00
84,305.00
99,715.00
115,615.00
139,615.00
213,055.00
278,465.00
327,785.00
361,230.00
437,885.00
3,145.00
9,420.00
14,880.00
21,265.00
55,080.00
76,835.00
81,600.00
119,580.00
137,400.00
152,485.00
232,800.00
253,835.00
286,740.00
319,740.00
352,860.00
385,860.00
9,125.00
14,380.00
20,545.00
47,240.00
61,430.00
65,980.00
121,355.00
HARGA (Rp.)
146,665.00
169,180.00
168,895.00
335,210.00
434,730.00
518,675.00
610,265.00
709,690.00
3,680.00
10,905.00
17,165.00
23,710.00
61,430.00
85,535.00
96,045.00
185,760.00
180,505.00
201,050.00
185,365.00
338,470.00
383,225.00
428,185.00
473,035.00
517,995.00
231,565.00
277,620.00
277,620.00
324,000.00
555,565.00
555,565.00
648,000.00
230,245.00
231,565.00
289,380.00
277,620.00
416,545.00
486,000.00
486,000.00
17,220.00
HARGA (Rp.)
35,040.00
52,860.00
70,680.00
106,320.00
124,140.00
141,960.00
177,600.00
213,240.00
248,880.00
284,520.00
320,160.00
355,800.00
391,440.00
237,540.00
454,400.00
963,000.00
412,500.00
485,400.00
558,348.00
704,100.00
777,000.00
849,900.00
995,700.00
1,141,500.00
1,287,300.00
1,663.84
1,663.84
1,663.84
1,663.84
1,663.84
1,663.84
1,663.84
1,663.84
1,663.84
1,663.84
DAFTAR HARGA SATUAN UPAH DAN BAHAN
Propinsi : Kalimantan Barat
Kabupaten : Kota Pontianak
Tahun Anggaran : 2015
1 2 3 4
A. UPAH
1 Mandor Lapangan Orang/Hari L 061
2 Mekanik Orang/Hari L 071
3 Kepala Tukang Orang/Hari L 073
4 Tukang Orang/Hari L 079
5 Operator Terlatih *) Orang/Hari L 081
6 Operator Kurang Terlatih *) Orang/Hari L 082
7 Supir Material / Truck Orang/Hari L 091
8 Buruh Lapangan Tak Terlatih Orang/Hari L 101
9 Buruh Lapangan Terlatih Orang/Hari L 106
B. BAHAN PENGISI
1 Batu Kong M³ M.101
2 Batu Sap Pinang M³ -
3 Batu pecah 15-20 cm M³ -
4 Batu pecah 10-15 cm M³ M.020
5 Batu pecah 5-7 cm M³ M.022
6 Batu pecah 3-5 cm M³ M.023
7 Batu pecah 2-3 cm M³ M.024
8 Batu pecah 1-2 cm M³ M.025
9 Batu pecah 1-1 cm M³ -
10 Batu pecah 0,5 cm M³ M.026
11 Stone Dust M³ -
12 Aspal Kg -
13 Pasir M³ M.040
14 Semen PC Zak M.080
15 Semen PC Kg -
16 Tanah Ex. Peniraman M³ M.050.a
17 Tanah EX. Peladis M³ M.050
18 Paving Block Bh -
19 Paving Stone Bh -
20 Paving Segi Enam Bh
21 Batu Bata 5 x 11 x 22cm Bh -
22 Bataco 15 x 30 x 7 cm Bh -
23 Bataco 15 x 30 x 6 cm
24 Bataco 20 x 40 x 9 cm ( press ) Bh -
25 Bataco 20 x 40 x 7 cm ( press ) Bh -
26 Kerawang ( roster ) 18 x 18 cm Bh -
27 Kerawang press ( roster ) 30 x 30 cm Bh -
28 Keramik 20 x 20 cm ex Roman Kotak -
29 Keramik 30 x 30 cm ex Roman Kotak -
U & B 86
No Uraian Bahan Satuan Kode
1 2 3 4
U & B 87
No Uraian Bahan Satuan Kode
1 2 3 4
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³ -
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³ -
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³ -
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M M³ -
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³ M.181.a
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ M.181.b
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ -
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³ -
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M M³ -
10 Ky. Belian ketam Uk. 6/6 - 4 M M³ -
11 Ky. Belian ketam Uk. 7/7 - 4 M M³ -
12 Ky. Belian ketam Uk. 8/8 - 4 M M³ -
13 Ky. Belian ketam Uk. 5/10 - 4 M M³ -
14 Ky. Belian ketam Uk. 4/8 - 4 M M³ -
15 Papan belian ketam (4m) M³ M.181.e
16 Papan belian tdk ketam (4m) M³ M.181.d
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³ M.181.f
18 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.g
19 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³ -
20 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³ -
21 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³ -
22 Kusen Ky Belian uk. 5/10
23 Kusen Ky Kelas I Bangkirai uk. 5/10 M³ -
24 Kusen Ky Kelas II uk. 5/11
25 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.h
26 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³ M.181.i
27 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³ -
28 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³ -
29 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³ -
30 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³ -
31 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³ -
32 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³ -
33 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³ -
34 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³ -
35 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³ -
36 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³ -
37 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³ -
38 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³ -
39 Papan kayu klas II (mabang) tdk ketam M³ M.181.j
40 Papan kayu klas II (mabang) ketam M³ M.181.k
41 Papan kayu klas I tdk ketam M³ -
42 Papan kayu klas I ketam M³ -
U & B 88
No Uraian Bahan Satuan Kode
1 2 3 4
D. BAHAN CAT
1 Amplas Lbr -
2 Minyak cat Kg -
3 Cat kilat Kg -
4 Plamur Kg -
5 Cat dasar Kg -
6 Cat tembok Kg -
7 Cat tembok type weather shield Kg -
8 Cat tembok type weather coat (acrylic) Kg -
9 Cat Dasar Emulsion Setara Dulux Kg
10 Cat Akhir Emulsion setara Dulux Kg
11 Cat Akhir Weather Shield setara Dulux Kg
12 Cat Dasar Emulsion setara Mowilex Kg
13 Cat Akhir Emulsion setara Mowilex Kg
14 Cat Weather Shield setara Mowilex Kg
15 Cat Dasar Emulsion setara Vinilex Kg
16 Cat Akhir Emulsion setara Vinilex Kg
17 Cat Weather Shield setara Vinilex Kg
18 Cat Alkali (Undercoat) Kg
19 Cat seng (Zinc Chromate) Kg -
20 Dempul Kg -
21 Plitur Kg -
22 Thiner Ltr M.090.f
23 Thiner ND Ltr -
24 Melamic Ltr -
25 Vernis Ltr -
26 Meni Kg -
27 Oker Kg -
28 Lem Kayu Kg -
29 Sealent Tube -
30 Soda Api Kg -
31 Sabun / cream pembersih kotoran Kg -
32 Teak Oil Ltr -
U & B 89
No Uraian Bahan Satuan Kode
1 2 3 4
U & B 90
No Uraian Bahan Satuan Kode
1 2 3 4
39 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) M² -
40 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) M² -
41 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) M² -
42 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) M² -
43 Reng Rangka Baja Ringan (Polos) uk. 0.40 - 0.45 Pjg 6 m btg
44 Rangka baja truss (0,75-6m) btg
45 Rangka baja truss (0,65-6m) btg
46 Dinabolt bh
47 L. Braket bh
48 Baut truss bh
49 Baut reng bh
50 Baut atap 5 cm bh
51 Alumunium Komposit + Rangka Besi M² -
52 Alumunium Komposit 1,24 x 2,44 m (setara alumatec) Lbr
53 Rangka Plafond Metal Furing + Pemasangan M² -
54 Besi stainles 1" btg
55 Besi tempa btg
F. BAHAN PENGGANTUNG
1 Pintu Plastik untuk WC Bh -
2 Kait angin Bh -
3 Handle Jendela Bh -
4 Handle Pintu Bh -
5 Engsel jendela Bh -
6 Engsel pintu Bh -
7 Slot pintu Bh -
8 Slot jendela Bh -
9 Kunci tanam 2 slag (setaraf Belluci) Bh -
10 Kunci tanam 1 slag Bh -
11 Kunci tanam antik Bh -
12 Kunci tanam biasa Bh -
13 Kunci silinder Bh -
14 Door Closer Bh -
15 Door Stoper Bh -
16 Paku Seng Kg M.166.a
17 Paku campuran 1" - 5 " Kg M.166.b
18 Paku beton Kg -
19 Paku triplek Kg -
20 Paku GRC Kg -
21 Paku Zincalum Kg
22 Paku Onduline Bh
23 Sekrup Onduline Bh
24 Sekrup Gibsum Kg
25 Sekrup Fixer Bh
26 Sekrup Steel Sheet Bh -
27 Sekrup Zincalume Bh
28 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit -
U & B 91
No Uraian Bahan Satuan Kode
1 2 3 4
G. BAHAN ATAP
1 Sirap belian Lbr -
2 Asbes Lbr -
3 Eternit M² -
4 Genteng Metal Type Permata 0.35 Lbr
5 Genteng Metal Type Prima 0.35 Lbr -
6 Genteng Metal Type Royal 0.35 Lbr -
7 Genteng Metal Type Classic 0.35 Lbr -
8 Genteng Metal Type Permata 0.25 Lbr
9 Genteng Metal Type Classic 0.25 Lbr
10 Genteng Metal Type Royal 0.26 Lbr
11 Atap Genteng Onduline Transparan 2 x 0,95 m Lbr
12 Atap Genteng Onduline Warna 2 x 0,95 m (merah,hijau,coklat & hitam) Lbr
13 Atap Genteng Onduline Warna 2 x 0,95 m (Biru /Premium) Lbr
14 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (merah,hijau,coklat & hitam) Lbr
15 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (teracota 3D & florentino) Lbr
16 Perabung Onduline Warna 90 x 50 cm (merah, coklat, hijau & hitam) Lbr
17 Perabung Onduline Warna 90 x 50 cm (biru/premium) Lbr
18 Perabung Onduline Warna 90 x 50 cm (florentino) Lbr
19 Siku Onduline Warna 110 x 40 cm (merah,coklat,hijau & hitam) Lbr
20 Apron Piece Onduvilla 102 x 14 cm Lbr
21 Verge Piece Onduline/Onduvilla 104 x 10,5 cm tinggi 11,4 cm Lbr
22 Onduband M
23 Atap Seng Metal Soka Abadi Lbr
24 Atap Seng Metal Soka Jempol Lbr
25 Atap Seng Metal Soka Tiara Lbr
26 Genteng Metal Stone ( Type Classic 0.35 ) Lbr -
27 Genteng Metal Stone ( Type Prima 0.35 ) Lbr -
28 Atap Metal Supersheet 0.35 (polos) M² -
29 Atap Metal Supersheet 0.35 (colour) M² -
30 Atap Metal Supersheet 0.25 (polos) M²
31 Atap Metal Supersheet 0.25 (colour) M²
32 Atap Trim Deck 0.3 (polos) M² -
33 Atap Trim Deck 0.35 (color) M² -
34 Atap polycarbonat M²
35 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh -
36 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh -
37 Nok bubungan genteng metal kotak 0.35 M' -
38 Nok bubungan genteng metal stone kotak 0.35 M' -
39 Nok bubungan Trim Deck (polos) M' -
40 Nok bubungan Trim Deck (color) M' -
41 Nok bubungan Steel Sheet 0.33 (color) (pj 50 cm) M' -
42 Nok bubungan Steel Sheet 0.43 (color) (pj 50 cm) M' -
U & B 92
No Uraian Bahan Satuan Kode
1 2 3 4
H. BAHAN KACA
1 Kaca Polos, t = 5 mm M² -
2 Kaca Polos, t = 12mm M² -
3 Kaca Rayben, t = 5 mm M² -
4 Kaca Cermin t = 3mm M² -
5 Kaca Repsol, t=5mm M²
6 Kaca Patri M² -
7 Sealent Kg -
8 Nako + Bingkai (80 x 15) x 10 daun polos Bh -
9 Nako + Bingkai (80 x 15) x 10 daun rayben Bh -
10 Kaca Es M² -
11 Kaca Polos, t = 8 mm M² -
12 Kaca Raindown, t = 5 mm M² -
13 Kaca Buram, t = 5 mm M² -
I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr -
2 Triplek t = 6 mm Lbr -
3 Triplek t = 9 mm Lbr -
4 Multiplek t = 10 mm Lbr -
5 Multiplek t = 12 mm Lbr -
6 Plywood 4' x 8' x 4 mm Lbr -
7 Panel GRC 120 x 240 x 40 Lbr -
8 Gypsum Board t = 9 mm Lbr -
9 HPL Lbr -
U & B 93
No Uraian Bahan Satuan Kode
1 2 3 4
J. BAHAN SANITASI
1 Kloset Duduk Monoblok Bh -
2 Kloset Duduk Putih Bh -
3 Kloset Duduk Warna Bh -
4 Kloset Jongkok (Setaraf Ina) Bh -
5 Kloset Jongkok (Setaraf Toto) Bh -
6 Kran Air Uk. 1/2" Bh -
7 Pipa Paralon Dia. 1/2" Btg -
8 Pipa Paralon Dia. 3/4" Btg -
9 Pipa Paralon Dia. 1" Btg -
10 Pipa Paralon Dia. 2" Btg -
11 Pipa Paralon Dia. 3" Btg -
12 Pipa Paralon Dia. 4" Btg -
13 Pipa Paralon Dia. 6" Btg -
14 Fiber Glass 1/2 m³ M³ -
15 Fiber Glass 1 m³ M³ -
16 Penampungan Air PE 1 m³ M³ -
U & B 94
No Uraian Bahan Satuan Kode
1 2 3 4
U & B 95
ARGA SATUAN UPAH DAN BAHAN
Harga Upah
Rp 120,000.00
Rp 110,000.00
Rp 120,000.00
Rp 110,000.00
Rp 150,000.00
Rp 100,000.00
Rp 100,000.00
Rp 95,000.00
Rp 95,000.00
Harga Bahan
5
Rp 192,500.00
Rp 200,000.00
Rp 308,500.00
Rp 333,300.00
Rp 350,000.00
Rp 375,000.00
Rp 400,000.00
Rp 415,000.00
Rp 400,000.00
Rp 495,100.00
Rp 295,600.00
Rp 13,000.00
Rp 85,000.00
Rp 75,000.00
Rp 1,520.00
Rp 191,100.00
Rp 247,700.00
Rp 2,200.00
Rp 3,500.00
Rp 5,520.00
Rp 1,500.00
Rp 1,100.00
Rp 900.00
Rp 2,500.00
Rp 1,900.00
Rp 12,000.00
Rp 53,700.00
Rp 70,500.00
Rp 82,800.00
U & B 96
Harga Bahan
5
Rp 85,700.00
Rp 90,000.00
Rp 93,000.00
Rp 55,000.00
Rp 100,000.00
Rp 140,000.00
Rp 155,000.00
Rp 155,000.00
Rp 155,000.00
Rp 319,500.00
Rp 496,800.00
Rp 323,000.00
Rp 460,230.00
Rp 284,000.00
Rp 290,000.00
Rp 223,000.00
Rp 230,000.00
Rp 850,000.00
Rp 275,000.00
Rp 8,300.00
Rp 52,600.00
Rp 76,000.00
Rp 86,400.00
Rp 9,600.00
Rp 944,000.00
Rp 991,300.00
Rp 1,025,000.00
Rp 1,059,300.00
Rp 1,134,000.00
Rp 1,189,300.00
Rp 1,225,000.00
Rp 1,240,000.00
Rp 1,266,700.00
Rp 1,306,500.00
Rp 1,341,500.00
Rp 1,377,500.00
Rp 1,406,500.00
Rp 1,432,500.00
Rp 1,467,500.00
Rp 1,504,000.00
Rp 1,536,500.00
Rp 38,300.00
Rp 11,300.00
Rp 960,000.00
Rp 1,200,000.00
Rp 780,000.00
Rp 900,000.00
Rp 200,790.00
U & B 97
Harga Bahan
5
Rp 27,500.00
Rp 3,000.00
Rp 50,000.00
Rp 35,000.00
Rp 10,142,500.00
Rp 9,621,000.00
Rp 7,936,100.00
Rp 7,617,200.00
Rp 9,567,900.00
Rp 9,412,000.00
Rp 13,020,900.00
Rp 10,416,700.00
Rp 10,000,000.00
Rp 11,154,500.00
Rp 10,058,300.00
Rp 11,015,700.00
Rp 10,928,600.00
Rp 10,273,400.00
Rp 13,252,300.00
Rp 12,682,300.00
Rp 6,699,200.00
Rp 6,510,400.00
Rp 5,227,600.00
Rp 5,739,800.00
Rp 8,100,000.00
Rp 19,500,000.00
Rp 15,000,000.00
Rp 11,500,000.00
Rp 3,828,100.00
Rp 3,971,400.00
Rp 4,024,900.00
Rp 4,153,700.00
Rp 2,924,400.00
Rp 3,135,000.00
Rp 3,789,700.00
Rp 4,583,300.00
Rp 4,108,800.00
Rp 4,199,200.00
Rp 3,993,000.00
Rp 4,557,300.00
Rp 2,225,000.00
Rp 1,850,000.00
Rp 6,250,000.00
Rp 6,377,300.00
Rp 10,819,800.00
Rp 11,188,300.00
U & B 98
Harga Bahan
5
Rp 1,800,000.00
Rp 1,064,800.00
Rp 18,000.00
Rp 30,700.00
Rp 5,000.00
Rp 6,400.00
Rp 7,700.00
Rp 75,000.00
Rp 91,200.00
Rp 235,000.00
Rp 8,800.00
Rp 62,500.00
Rp 7,500.00
Rp 2,800.00
Rp 17,300.00
Rp 54,100.00
Rp 31,500.00
Rp 42,320.00
Rp 50,000.00
Rp 172,000.00
Rp 147,400.00
Rp 109,500.00
Rp 99,500.00
Rp 98,300.00
Rp 52,000.00
Rp 70,400.00
Rp 86,000.00
Rp 23,700.00
Rp 26,600.00
Rp 50,784.00
Rp 27,500.00
Rp 43,900.00
Rp 21,200.00
Rp 50,600.00
Rp 18,200.00
Rp 22,100.00
Rp 62,400.00
Rp 32,000.00
Rp 48,000.00
Rp 11,000.00
Rp 17,100.00
Rp 30,000.00
Rp 21,100.00
Rp 15,700.00
Rp 60,000.00
U & B 99
Harga Bahan
5
Rp 54,000.00
Rp 22,500.00
Rp 115,920.00
Rp 55,476.00
Rp 39,000.00
Rp 31,740.00
Rp 78,500.00
Rp 10,600.00
Rp 12,100.00
Rp 20,000.00
Rp 17,900.00
Rp 15,500.00
Rp 4,500.00
Rp 16,000.00
Rp 15,000.00
Rp 310,000.00
Rp 20,700.00
Rp 15,870.00
Rp 17,526.00
Rp 5,300.00
Rp 28,500.00
Rp 26,300.00
Rp 10,000.00
Rp 118,300.00
Rp 93,100.00
Rp 139,800.00
Rp 205,000.00
Rp 246,300.00
Rp 302,900.00
Rp 390,000.00
Rp 582,500.00
Rp 925,000.00
Rp 1,071,300.00
Rp 1,721,700.00
Rp 621,700.00
Rp 85,000.00
Rp 95,000.00
Rp 1,500,000.00
Rp 120,000.00
Rp 65,000.00
Rp 65,000.00
Rp 250,000.00
Rp 272,500.00
Rp 235,200.00
Rp 304,100.00
U & B 100
Harga Bahan
5
Rp 175,000.00
Rp 225,400.00
Rp 193,900.00
Rp 257,000.00
Rp 52,500.00
Rp 82,000.00
Rp 75,000.00
Rp 5,700.00
Rp 6,000.00
Rp 800.00
Rp 800.00
Rp 800.00
Rp 908,700.00
Rp 1,339,100.00
Rp 129,100.00
Rp 119,600.00
Rp 69,600.00
Rp 254,000.00
Rp 10,400.00
Rp 9,900.00
Rp 129,100.00
Rp 10,700.00
Rp 18,300.00
Rp 17,000.00
Rp 6,400.00
Rp 179,100.00
Rp 162,500.00
Rp 47,500.00
Rp 55,000.00
Rp 60,800.00
Rp 171,100.00
Rp 52,500.00
Rp 20,900.00
Rp 19,900.00
Rp 31,400.00
Rp 18,100.00
Rp 21,300.00
Rp 10,700.00
Rp 1,300.00
Rp 1,500.00
Rp 48,300.00
Rp 2,500.00
Rp 700.00
Rp 500.00
Rp 4,208,700.00
U & B 101
Harga Bahan
5
Rp 2,104,300.00
Rp 1,578,300.00
Rp 631,300.00
Rp 5,300.00
Rp 57,200.00
Rp 68,400.00
Rp 52,500.00
Rp 51,400.00
Rp 82,662.00
Rp 83,490.00
Rp 36,400.00
Rp 35,400.00
Rp 36,600.00
Rp 154,000.00
Rp 48,500.00
Rp 193,000.00
Rp 48,500.00
Rp 54,000.00
Rp 94,500.00
Rp 95,000.00
Rp 96,000.00
Rp 85,000.00
Rp 89,500.00
Rp 142,002.00
Rp 55,000.00
Rp 92,000.00
Rp 64,000.00
Rp 53,000.00
Rp 80,000.00
Rp 80,000.00
Rp 81,300.00
Rp 111,900.00
Rp 47,000.00
Rp 64,000.00
Rp 100,000.00
Rp 112,300.00
Rp 78,300.00
Rp 46,000.00
Rp 70,000.00
Rp 50,000.00
Rp 96,900.00
Rp 109,500.00
Rp 123,100.00
Rp 22,000.00
Rp 80,178.00
U & B 102
Harga Bahan
5
Rp 65,136.00
Rp 70,242.00
Rp 64,000.00
Rp 44,200.00
Rp 44,700.00
Rp 66,300.00
Rp 20,000.00
Rp 54,300.00
Rp 75,900.00
Rp 120,100.00
Rp 70,000.00
Rp 83,800.00
Rp 80,000.00
Rp 55,000.00
Rp 46,500.00
Rp 52,600.00
Rp 55,000.00
Rp 65,000.00
Rp 24,150.00
Rp 209,484.00
Rp 420,624.00
Rp 145,000.00
Rp 550,000.00
Rp 167,500.00
Rp 240,000.00
Rp 450,000.00
Rp 2,350,000.00
Rp 106,900.00
Rp 250,000.00
Rp 300,000.00
Rp 210,000.00
Rp 350,000.00
Rp 220,000.00
Rp 138,700.00
Rp 70,000.00
Rp 120,000.00
Rp 220,000.00
Rp 178,900.00
Rp 264,200.00
Rp 108,000.00
Rp 70,900.00
Rp 68,000.00
Rp 348,360.00
U & B 103
Harga Bahan
5
Rp 1,320,000.00
Rp 2,074,300.00
Rp 2,350,000.00
Rp 182,900.00
Rp 182,900.00
Rp 25,900.00
Rp 21,100.00
Rp 27,100.00
Rp 40,000.00
Rp 66,500.00
Rp 114,000.00
Rp 187,700.00
Rp 623,400.00
Rp 1,192,440.00
Rp 2,384,760.00
Rp 2,166,000.00
Rp 9,955.00
Rp 10,320.00
Rp 15,000.00
Rp 10,920.00
Rp 39,480.00
Rp 76,320.00
Rp 14,160.00
Rp 13,560.00
Rp 91,560.00
Rp 100,080.00
Rp 101,760.00
Rp 84,000.00
Rp 480,000.00
Rp 36,000.00
Rp 18,000.00
Rp 60,000.00
Rp 30,000.00
Rp 240,000.00
Rp 26,400.00
Rp 180,000.00
Rp 6,480.00
Rp -
Rp -
Rp -
Rp -
U & B 104
Harga Bahan
5
U & B 105
KOEFISIEN TENAGA KERJA DAN KOEFISIEN BAHAN
A.2.2.1 Pekerjaan Persiapan
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Ker
B BAHAN
1 Kayu balok 5/7 m³ 0.120
2 Paku 2" - 3" Kg 0.020
3 Kayu papan 3/20 m³ 0.007
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
N TENAGA KERJA DAN KOEFISIEN BAHAN
95,000.00 9,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 600.00
Jumlah Harga Tenaga Kerja 22,300.00
3,135,000.00 376,200.00
19,900.00 398.00
1,800,000.00 12,600.00
Jumlah Harga Bahan 389,198.00
-
Jumlah Harga Alat -
411,498.00
xD -
411,498.00
A.2.3.1 Pekerjaan Tanah
A TENAGA
1 Pekerja L.01 OH 0.750
2 Mandor L.04 OH 0.025
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.900
2 Mandor L.04 OH 0.045
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.050
2 Mandor L.04 OH 0.067
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.2.3.1.4 Penggalian 1 m³ tanah keras sedalam 1 m
A TENAGA
1 Pekerja L.01 OH 1.000
2 Mandor L.04 OH 0.032
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.500
2 Mandor L.04 OH 0.060
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.200
2 Mandor L.04 OH 0.045
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.2.3.1.7 Pengerjaan stripping 1 m² tanah tebing setinggi 1 m
A TENAGA
1 Pekerja L.01 OH 0.050
2 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.330
2 Mandor L.04 OH 0.010
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.500
2 Mandor L.04 OH 0.050
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.2.3.1.10 Pemadatan tanah 1 m³ (per 20 cm)
A TENAGA
1 Pekerja L.01 OH 0.500
2 Mandor L.04 OH 0.050
Jumlah Harga Tenaga Ker
B BAHAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.300
2 Mandor L.04 OH 0.010
Jumlah Harga Tenaga Ker
B BAHAN
1 Pasir urug 1.200
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.800
2 Tukang L.02 OH 0.400
3 Kepala Tukang L.03 OH 0.040
4 Mandor L.04 OH 0.080
Jumlah Harga Tenaga Ker
B BAHAN
1 Kapur padam m³ 0.135
2 Pasir pasang m³ 0.400
3 Tanah liat m³ 0.948
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.2.3.1.13 Pemasangan 1 m² lapisan ijuk tebal 10 cm untuk bidang resapan
A TENAGA
1 Pekerja L.01 OH 0.150
2 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Ijuk m³ 6.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.250
2 Mandor L.04 OH 0.025
Jumlah Harga Tenaga Ker
B BAHAN
1 Sirtu m³ 1.200
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 71,250.00
120,000.00 3,000.00
Jumlah Harga Tenaga Kerja 74,250.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
74,250.00
xD -
74,250.00
95,000.00 85,500.00
120,000.00 5,400.00
Jumlah Harga Tenaga Kerja 90,900.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
90,900.00
xD -
90,900.00
95,000.00 99,750.00
120,000.00 8,040.00
Jumlah Harga Tenaga Kerja 107,790.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
107,790.00
xD -
107,790.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 95,000.00
120,000.00 3,840.00
Jumlah Harga Tenaga Kerja 98,840.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
98,840.00
xD -
98,840.00
95,000.00 142,500.00
120,000.00 7,200.00
Jumlah Harga Tenaga Kerja 149,700.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
149,700.00
xD -
149,700.00
95,000.00 114,000.00
120,000.00 5,400.00
Jumlah Harga Tenaga Kerja 119,400.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
119,400.00
xD -
119,400.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 4,750.00
120,000.00 600.00
Jumlah Harga Tenaga Kerja 5,350.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
5,350.00
xD -
5,350.00
95,000.00 31,350.00
120,000.00 1,200.00
Jumlah Harga Tenaga Kerja 32,550.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
32,550.00
xD -
32,550.00
95,000.00 47,500.00
120,000.00 6,000.00
Jumlah Harga Tenaga Kerja 53,500.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
53,500.00
xD -
53,500.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 47,500.00
120,000.00 6,000.00
Jumlah Harga Tenaga Kerja 53,500.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
53,500.00
xD -
53,500.00
95,000.00 28,500.00
120,000.00 1,200.00
Jumlah Harga Tenaga Kerja 29,700.00
85,000.00 102,000.00
Jumlah Harga Bahan 102,000.00
-
Jumlah Harga Alat -
131,700.00
xD -
131,700.00
95,000.00 76,000.00
110,000.00 44,000.00
120,000.00 4,800.00
120,000.00 9,600.00
Jumlah Harga Tenaga Kerja 134,400.00
- -
85,000.00 34,000.00
- -
Jumlah Harga Bahan 34,000.00
-
Jumlah Harga Alat -
168,400.00
xD -
168,400.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 14,250.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 16,050.00
- -
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
16,050.00
xD -
16,050.00
95,000.00 23,750.00
120,000.00 3,000.00
Jumlah Harga Tenaga Kerja 26,750.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
26,750.00
xD -
26,750.00
A.4.1.1 Pekerjaan Beton
A TENAGA
1 Pekerja L.01 OH 1.323
2 Tukang Batu L.02 OH 0.189
3 Kepala Tukang L.03 OH 0.019
4 Mandor L.04 OH 0.066
Jumlah Harga Tenaga Ker
B BAHAN
1 Semen portland Kg 247.000
2 Pasir beton Kg 869.000
3 kerikil (maks 30 mm) Kg 999.000
4 Air Ltr 215.000
Jumlah Harga Baha
C PERALATAN
1. Molen sewa-hari 0.250
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.5.a Pembuatan 1 m³ beton mutu fc 14,5 Mpa (K175) menggunakan molen
No. Uraian Kode Satuan Koefisien
A TENAGA
1 Pekerja L.01 OH 1.323
2 Tukang Batu L.02 OH 0.189
3 Kepala Tukang L.03 OH 0.019
4 Mandor L.04 OH 0.066
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
G Harga Satuan Pekerjaan Per 1 Kg
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)
No. Uraian Kode Satuan Koefisien
A TENAGA
1 Pekerja L.01 OH 0.025
2 Tukang Besi L.02 OH 0.025
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.001
Jumlah Harga Tenaga Ker
B BAHAN
1 Jaring kawat baja dilas Kg 10.200
2 Kawat beton Kg 0.050
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Acuan : SNI DT 91-0008-2007
A.4.1.1.21.a Pemasangan 1 m² bekisting untuk sloof (pemakaian berulang)
No. Uraian Kode Satuan Koefisien
A TENAGA
1 Pekerja L.01 OH 0.520
2 Tukang Kayu L.02 OH 0.260
3 Kepala Tukang L.03 OH 0.026
4 Mandor L.04 OH 0.026
Jumlah Harga Tenaga Ker
B BAHAN
1 Kayu kelas III m³ 0.023
2 Paku 5 - 10 cm Kg 0.300
3 Minyak bekisting Ltr 0.100
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.22.a.1 Pemasangan 1 m² bekisting untuk kolom (dengan papan mal pemakaian berulang)
No. Uraian Kode Satuan Koefisien
A TENAGA
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.23.a.1 Pemasangan 1 m² bekisting untuk kolom (dengan papan mal pemakaian berulang)
No. Uraian Kode Satuan Koefisien
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ker
B BAHAN
1 Kayu kelas III m³ 0.029
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4. Papan mal m³ 0.009
5. Dolken kayu Ø 8-10 / 400 cm Btg 1.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.26 Pemasangan 1 m² bekisting untuk tangga
No. Uraian Kode Satuan Koefisien
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ker
B BAHAN
1 Kayu kelas III m³ 0.030
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.150
4 Balok kayu kelas II m³ 0.015
5 Plywood tebal 9 mm Lbr 0.350
6 Dolken kayu Ø 8-10 / 400 cm Btg 2.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 125,685.00
110,000.00 20,790.00
120,000.00 2,280.00
120,000.00 7,920.00
Jumlah Harga Tenaga Kerja 156,675.00
1,500.00 370,500.00
60.71 52,760.71
296.30 296,000.00
-
Jumlah Harga Bahan 719,260.71
35,000.00 8,750.00
Jumlah Harga Alat 8,750.00
884,685.71
xD -
884,685.71
95,000.00 156,750.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
1,500.00 489,000.00
60.71 46,142.86
296.30 304,888.89
-
Jumlah Harga Bahan 840,031.75
-
Jumlah Harga Alat -
1,040,351.75
xD -
1,040,351.75
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 125,685.00
110,000.00 20,790.00
120,000.00 2,280.00
120,000.00 7,920.00
1,500.00 489,000.00
60.71 46,142.86
296.30 304,888.89
-
Jumlah Harga Bahan 840,031.75
35,000.00 8,750.00
Jumlah Harga Alat 8,750.00
1,005,456.75
xD -
1,005,456.75
95,000.00 6,650.00
110,000.00 7,700.00
120,000.00 840.00
120,000.00 480.00
Jumlah Harga Tenaga Kerja 15,670.00
10,600.00 111,300.00
20,000.00 3,000.00
Jumlah Harga Bahan 114,300.00
-
Jumlah Harga Alat -
129,970.00
xD -
129,970.00
12,997.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 2,375.00
110,000.00 2,750.00
120,000.00 3,000.00
120,000.00 120.00
Jumlah Harga Tenaga Kerja 8,245.00
12,100.00 123,420.00
20,000.00 1,000.00
Jumlah Harga Bahan 124,420.00
-
Jumlah Harga Alat -
132,665.00
xD -
132,665.00
13,266.50
95,000.00 49,400.00
110,000.00 28,600.00
120,000.00 3,120.00
120,000.00 3,120.00
Jumlah Harga Tenaga Kerja 84,240.00
1,800,000.00 55,800.00
19,900.00 5,970.00
-
Jumlah Harga Bahan 61,770.00
-
Jumlah Harga Alat -
146,010.00
xD -
146,010.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 49,400.00
110,000.00 28,600.00
120,000.00 3,120.00
120,000.00 3,120.00
Jumlah Harga Tenaga Kerja 84,240.00
1,850,000.00 41,625.00
19,900.00 5,970.00
-
Jumlah Harga Bahan 47,595.00
-
Jumlah Harga Alat -
131,835.00
xD -
131,835.00
95,000.00 62,700.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
Jumlah Harga Tenaga Kerja 106,920.00
1,850,000.00 50,875.00
19,900.00 7,960.00
-
1,800,000.00 15,300.00
7,700.00 7,700.00
Jumlah Harga Bahan 81,835.00
-
Jumlah Harga Alat -
188,755.00
xD -
188,755.00
g untuk kolom (dengan papan mal pemakaian berulang)
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 62,700.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
Jumlah Harga Tenaga Kerja 106,920.00
1,850,000.00 53,650.00
19,900.00 7,960.00
-
1,800,000.00 15,300.00
7,700.00 7,700.00
Jumlah Harga Bahan 84,610.00
-
Jumlah Harga Alat -
191,530.00
xD -
191,530.00
95,000.00 62,700.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
Jumlah Harga Tenaga Kerja 106,920.00
1,850,000.00 101,750.00
19,900.00 7,960.00
-
1,800,000.00 32,400.00
7,700.00 46,200.00
Jumlah Harga Bahan 188,310.00
-
Jumlah Harga Alat -
295,230.00
xD -
295,230.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 62,700.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
Jumlah Harga Tenaga Kerja 106,920.00
1,800,000.00 54,000.00
19,900.00 7,960.00
10,320.00 1,548.00
2,924,400.00 43,866.00
220,000.00 77,000.00
7,700.00 15,400.00
Jumlah Harga Bahan 199,774.00
-
Jumlah Harga Alat -
306,694.00
xD -
306,694.00
A.4.4.1 Pekerjaan Dinding Pasangan
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang Batu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.030
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 140.000
2 Semen portland Kg 43.500
3 Pasir pasang m³ 0.080
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang Batu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.030
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 140.000
2 Semen portland Kg 32.950
3 Pasir pasang m³ 0.091
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.3 Pemasangan 1 m² dinding bata merah 1 batu camp. 1SP : 4PP
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang Batu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.030
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 140.000
2 Semen portland Kg 26.550
3 Pasir pasang m³ 0.093
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang Batu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.030
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 140.000
2 Semen portland Kg 22.200
3 Pasir pasang m³ 0.102
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.5 Pemasangan 1 m² dinding bata merah 1 batu camp. 1SP : 6PP
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang Batu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.030
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 140.000
2 Semen portland Kg 18.500
3 Pasir pasang m³ 0.122
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang Batu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.030
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 140.000
2 Semen portland Kg 10.080
3 Kapur padam m³ 0.0275
4 Pasir pasang m³ 0.0925
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.7 Pemasangan 1 m² dinding bata merah 1/2 batu camp. 1SP : 2PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 70.000
2 Semen portland Kg 18.950
3 Pasir pasang m³ 0.038
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.8 Pemasangan 1 m² dinding bata merah 1/2 batu camp. 1SP : 3PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 70.000
2 Semen portland Kg 14.370
3 Pasir pasang m³ 0.040
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.9 Pemasangan 1 m² dinding bata merah 1/2 batu camp. 1SP : 4PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 70.000
2 Semen portland Kg 11.500
3 Pasir pasang m³ 0.043
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.10 Pemasangan 1 m² dinding bata merah 1/2 batu camp. 1SP : 5PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 70.000
2 Semen portland Kg 9.680
3 Pasir pasang m³ 0.045
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.11 Pemasangan 1 m² dinding bata merah 1/2 batu camp. 1SP : 6PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 70.000
2 Semen portland Kg 8.320
3 Pasir pasang m³ 0.049
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 70.000
2 Semen portland Kg 6.500
3 Pasir pasang m³ 0.050
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.13 Pemasangan 1 m² dinding bata merah 1/2 batu 1SP : 3KP : 10PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 70.000
2 Semen portland Kg 4.500
3 Kapur padam m³ 0.015
4 Pasir pasang m³ 0.050
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.14 Pemasangan 1 m² dinding bata merah 1/2 batu 1KP : 1SM : 1PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 70.000
2 Semen portland Kg 0.018
3 Kapur padam m³ 0.018
4 Pasir pasang m³ 0.018
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.15 Pemasangan 1 m² dinding bata merah 1/2 batu 1KP : 1SM : 2PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata merah uk. (5 x 11 x 22) cm m³ 70.000
2 Semen portland Kg 0.014
3 Kapur padam m³ 0.014
4 Pasir pasang m³ 0.028
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.350
2 Tukang Batu L.02 OH 0.150
3 Kepala Tukang L.03 OH 0.015
4 Mandor L.04 OH 0.018
Jumlah Harga Tenaga Ker
B BAHAN
1 HB - 20 m³ 12.500
2 Semen portland Kg 30.320
3 Pasir pasang m³ 0.728
4 Besi angker Ø 8 mm Kg 0.290
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.17 Pemasangan 1 m² dinding conblock HB20 camp. 1SP : 4PP
A TENAGA
1 Pekerja L.01 OH 0.350
2 Tukang Batu L.02 OH 0.150
3 Kepala Tukang L.03 OH 0.015
4 Mandor L.04 OH 0.018
Jumlah Harga Tenaga Ker
B BAHAN
1 HB - 20 m³ 12.500
2 Semen portland Kg 24.260
3 Pasir pasang m³ 0.772
4 Besi angker Ø 8 mm Kg 0.280
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.320
2 Tukang Batu L.02 OH 0.120
3 Kepala Tukang L.03 OH 0.012
4 Mandor L.04 OH 0.016
Jumlah Harga Tenaga Ker
B BAHAN
1 HB - 15 m³ 12.500
2 Semen portland Kg 22.740
3 Pasir pasang m³ 0.550
4 Besi angker Ø 8 mm Kg 0.280
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.19 Pemasangan 1 m² dinding conblock HB15 camp. 1SP : 4PP
A TENAGA
1 Pekerja L.01 OH 0.320
2 Tukang Batu L.02 OH 0.120
3 Kepala Tukang L.03 OH 0.012
4 Mandor L.04 OH 0.016
Jumlah Harga Tenaga Ker
B BAHAN
1 HB - 15 m³ 12.500
2 Semen portland Kg 18.200
3 Pasir pasang m³ 0.582
4 Besi angker Ø 8 mm Kg 0.280
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 HB - 10 m³ 12.500
2 Semen portland Kg 15.160
3 Pasir pasang m³ 0.364
4 Besi angker Ø 8 mm Kg 0.280
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.1.21 Pemasangan 1 m² dinding conblock HB10 camp. 1SP : 4PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 HB - 10 m³ 12.500
2 Semen portland Kg 12.130
3 Pasir pasang m³ 0.388
4 Besi angker Ø 8 mm Kg 0.280
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.320
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Batako 15/30/7 bh 22.000
2 Semen portland Kg 7.500
3 Pasir pasang m³ 0.027
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata rooster (12 x 11 x 24) cm m³ 30.000
2 Semen portland Kg 11.000
3 Pasir pasang m³ 0.035
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Bata rooster (12 x 11 x 24) cm m³ 30.000
2 Semen portland Kg 11.000
3 Pasir pasang m³ 0.035
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 57,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 85,000.00
Err:509 Err:509
1,500.00 65,250.00
85,000.00 6,800.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 57,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 85,000.00
Err:509 Err:509
1,500.00 49,425.00
85,000.00 7,735.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 57,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 85,000.00
Err:509 Err:509
1,500.00 39,825.00
85,000.00 7,905.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 57,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 85,000.00
Err:509 Err:509
1,500.00 33,300.00
85,000.00 8,670.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 57,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 85,000.00
Err:509 Err:509
1,500.00 27,750.00
85,000.00 10,370.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 57,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 85,000.00
Err:509 Err:509
1,500.00 15,120.00
Err:509 Err:509
85,000.00 7,862.50
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 28,425.00
85,000.00 3,230.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 21,555.00
85,000.00 3,400.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 17,250.00
85,000.00 3,655.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 14,520.00
85,000.00 3,825.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 12,480.00
85,000.00 4,165.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 9,750.00
85,000.00 4,250.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 6,750.00
Err:509 Err:509
85,000.00 4,250.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 27.00
Err:509 Err:509
85,000.00 1,530.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 21.00
Err:509 Err:509
85,000.00 2,380.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 33,250.00
110,000.00 16,500.00
120,000.00 1,800.00
120,000.00 2,160.00
Jumlah Harga Tenaga Kerja 53,710.00
-
1,500.00 45,480.00
85,000.00 61,880.00
Err:509 Err:509
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 33,250.00
110,000.00 16,500.00
120,000.00 1,800.00
120,000.00 2,160.00
Jumlah Harga Tenaga Kerja 53,710.00
-
1,500.00 36,390.00
85,000.00 65,620.00
Err:509 Err:509
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 30,400.00
110,000.00 13,200.00
120,000.00 1,440.00
120,000.00 1,920.00
Jumlah Harga Tenaga Kerja 46,960.00
-
1,500.00 34,110.00
85,000.00 46,750.00
Err:509 Err:509
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 30,400.00
110,000.00 13,200.00
120,000.00 1,440.00
120,000.00 1,920.00
Jumlah Harga Tenaga Kerja 46,960.00
-
1,500.00 27,300.00
85,000.00 49,470.00
Err:509 Err:509
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
-
1,500.00 22,740.00
85,000.00 30,940.00
Err:509 Err:509
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
-
1,500.00 18,195.00
85,000.00 32,980.00
Err:509 Err:509
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 30,400.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 44,400.00
1,100.00 24,200.00
1,500.00 11,250.00
85,000.00 2,295.00
Jumlah Harga Bahan 37,745.00
-
Jumlah Harga Alat -
82,145.00
xD -
82,145.00
1,900.00 23,750.00
1,500.00 11,250.00
85,000.00 2,295.00
Jumlah Harga Bahan 37,295.00
-
Jumlah Harga Alat -
81,695.00
xD -
81,695.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 16,500.00
85,000.00 2,975.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
95,000.00 28,500.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 42,500.00
Err:509 Err:509
1,500.00 16,500.00
85,000.00 2,975.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
Err:509 Err:509
1,500.00 21,000.00
85,000.00 2,720.00
Jumlah Harga Bahan Err:509
-
Jumlah Harga Alat -
Err:509
xD Err:509
Err:509
A.4.4.2 Pekerjaan Plesteran
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.150
3 Kepala Tukang L.03 OH 0.015
4 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ker
B BAHAN
1 Semen portland Kg 6.240
2 Pasir pasang m³ 0.024
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.200
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.010
Jumlah Harga Tenaga Ker
B BAHAN
1 Semen portland Kg 3.250
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 28,500.00
110,000.00 16,500.00
120,000.00 1,800.00
120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 48,600.00
1,500.00 9,360.00
85,000.00 2,040.00
Jumlah Harga Bahan 11,400.00
-
Jumlah Harga Alat -
60,000.00
xD -
60,000.00
95,000.00 19,000.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 1,200.00
Jumlah Harga Tenaga Kerja 32,400.00
1,500.00 4,875.00
Jumlah Harga Bahan 4,875.00
-
Jumlah Harga Alat -
37,275.00
xD -
37,275.00
A.4.4.3 Pekerjaan Penutup Lantai & Penutup Dinding
A TENAGA
1 Pekerja L.01 OH 0.270
2 Tukang Batu L.02 OH 0.135
3 Kepala Tukang L.03 OH 0.014
4 Mandor L.04 OH 0.014
Jumlah Harga Tenaga Ker
B BAHAN
1 Ubin abu-abu Bh 26.500
2 Semen portland Kg 10.400
3 Pasir pasang m³ 0.045
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.250
2 Tukang Batu L.02 OH 0.125
3 Kepala Tukang L.03 OH 0.013
4 Mandor L.04 OH 0.013
Jumlah Harga Tenaga Ker
B BAHAN
1 Ubin warna Bh 6.630
2 Semen portland Kg 9.800
3 Semen warna Kg 1.300
4 Pasir pasang m³ 0.045
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.620
2 Tukang Batu L.02 OH 0.350
3 Kepala Tukang L.03 OH 0.035
4 Mandor L.04 OH 0.030
Jumlah Harga Tenaga Ker
B BAHAN
1 Keramik uk. 40 x 40 cm (polos) Bh 6.250
2 Semen portland Kg 11.380
3 Semen warna Kg 1.500
4 Pasir pasang m³ 0.042
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Acuan : ABK Bangunan Gedung dan Perumahan - 6.47
A.4.4.3.5 Pemasangan 1 m² lantai ubin warna 30 x 30 cm
A TENAGA
1 Pekerja L.01 OH 0.260
2 Tukang Batu L.02 OH 0.130
3 Kepala Tukang L.03 OH 0.013
4 Mandor L.04 OH 0.013
Jumlah Harga Tenaga Ker
B BAHAN
1 Ubin warna Bh 11.870
2 Semen portland Kg 10.000
3 Semen warna Kg 1.500
4 Pasir pasang m³ 0.045
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.260
2 Tukang Batu L.02 OH 0.130
3 Kepala Tukang L.03 OH 0.013
4 Mandor L.04 OH 0.013
Jumlah Harga Tenaga Ker
B BAHAN
1 Ubin teraso Bh 11.870
2 Semen portland Kg 10.000
3 Semen warna Kg 1.500
4 Pasir pasang m³ 0.045
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.13 Pemasangan 1 m² lantai ubin teralux marmer 60 x 60 cm
A TENAGA
1 Pekerja L.01 OH 0.240
2 Tukang Batu L.02 OH 0.120
3 Kepala Tukang L.03 OH 0.012
4 Mandor L.04 OH 0.012
Jumlah Harga Tenaga Ker
B BAHAN
1 Ubin teralux marmer Bh 3.100
2 Semen portland Kg 9.600
3 Semen warna Kg 1.500
4 Pasir pasang m³ 0.045
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang batu L.02 OH 0.450
3 Kepala Tukang L.03 OH 0.045
4 Mandor L.04 OH 0.030
Jumlah Harga Tenaga Ke
B BAHAN
1 Keramik Bh 20.000
2 Semen portland Kg 9.300
3 Pasir pasng m³ 0.018
4 Semen warna Kg 2.000
Jumlah Harga Bah
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Acuan : ABK Bangunan Gedung dan Perumahan - 6.63
A.4.4.3.58 Pemasangan 1 m² dinding batu temple hitam
A TENAGA
1 Pekerja L.01 OH 0.700
2 Tukang Batu L.02 OH 0.350
3 Kepala Tukang L.03 OH 0.035
4 Mandor L.04 OH 0.035
Jumlah Harga Tenaga Ker
B BAHAN
1 Batu temple hitam Bh 1.100
2 Semen portland Kg 11.750
3 Pasir pasang m³ 0.035
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 25,650.00
110,000.00 14,850.00
120,000.00 1,680.00
120,000.00 1,680.00
Jumlah Harga Tenaga Kerja 43,860.00
-
1,500.00 15,600.00
85,000.00 3,825.00
Jumlah Harga Bahan 19,425.00
-
Jumlah Harga Alat -
63,285.00
xD -
63,285.00
95,000.00 23,750.00
110,000.00 13,750.00
120,000.00 1,560.00
120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 40,620.00
-
1,500.00 14,700.00
11,000.00 14,300.00
85,000.00 3,825.00
Jumlah Harga Bahan 32,825.00
-
Jumlah Harga Alat -
73,445.00
xD -
73,445.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 58,900.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 105,200.00
9,166.67 57,291.67
1,500.00 17,070.00
11,000.00 16,500.00
85,000.00 3,570.00
Jumlah Harga Bahan 94,431.67
-
Jumlah Harga Alat -
199,631.67
xD -
199,631.67
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 24,700.00
110,000.00 14,300.00
120,000.00 1,560.00
120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 42,120.00
-
1,500.00 15,000.00
50,000.00 75,000.00
85,000.00 3,825.00
Jumlah Harga Bahan 93,825.00
-
Jumlah Harga Alat -
135,945.00
xD -
135,945.00
95,000.00 24,700.00
110,000.00 14,300.00
120,000.00 1,560.00
120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 42,120.00
-
1,500.00 15,000.00
50,000.00 75,000.00
85,000.00 3,825.00
Jumlah Harga Bahan 93,825.00
-
Jumlah Harga Alat -
135,945.00
xD -
135,945.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 22,800.00
110,000.00 13,200.00
120,000.00 1,440.00
120,000.00 1,440.00
Jumlah Harga Tenaga Kerja 38,880.00
-
1,500.00 14,400.00
50,000.00 75,000.00
85,000.00 3,825.00
Jumlah Harga Bahan 93,225.00
-
Jumlah Harga Alat -
132,105.00
xD -
132,105.00
95,000.00 57,000.00
110,000.00 49,500.00
120,000.00 5,400.00
120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 115,500.00
3,800.00 76,000.00
1,500.00 13,950.00
85,000.00 1,530.00
11,000.00 22,000.00
Jumlah Harga Bahan 113,480.00
228,980.00
xD -
228,980.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 66,500.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 4,200.00
Jumlah Harga Tenaga Kerja 113,400.00
-
1,500.00 17,625.00
85,000.00 2,975.00
Jumlah Harga Bahan 20,600.00
-
Jumlah Harga Alat -
134,000.00
xD -
134,000.00
A.4.5.1 Pekerjaan Plafond
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02 OH 0.050
3 Kepala Tukang L.03 OH 0.005
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Ker
B BAHAN
1 GRC board Lbr 0.364
2 Paku GRC Kg 0.110
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 9,500.00
110,000.00 5,500.00
120,000.00 600.00
120,000.00 600.00
Jumlah Harga Tenaga Kerja 16,200.00
70,900.00 25,807.60
21,300.00 2,343.00
Jumlah Harga Bahan 28,150.60
-
Jumlah Harga Alat -
44,350.60
xD -
44,350.60
A.4.5.2 Pekerjaan Penutup Atap
A TENAGA
1 Pekerja L.01 OH 0.200
2 Tukang Kayu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.001
Jumlah Harga Tenaga Ker
B BAHAN
1 Genteng metal type prima bjls 0.35 Bh 1.840
2 Paku biasa ½" - 1" Kg 0.200
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
ABK.SNI.P.PA.07 1m' Pekerjaan Bubungan dengan Seng Datar Color 0.35 / 10 m'
A TENAGA
1 Tukang Kayu L.02 OH 0.250
2 Kepala Tukang L.03 OH 0.250
3 Pekerja L.04 OH 0.025
Jumlah Harga Tenaga Ke
B BAHAN
1 Paku Camp. Kg 0.100
2 Seng Datar Color 0.35 Kg 6.000
3 Papan Kayu Kelas II (tdk ketam) Kg 0.072
Jumlah Harga Bah
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Jadi 1
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 19,000.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 120.00
Jumlah Harga Tenaga Kerja 31,320.00
51,400.00 94,576.00
19,900.00 3,980.00
Jumlah Harga Bahan 98,556.00
-
Jumlah Harga Alat -
129,876.00
xD -
129,876.00
110,000.00 27,500.00
120,000.00 30,000.00
95,000.00 2,375.00
Jumlah Harga Tenaga Kerja 59,875.00
19,900.00 1,990.00
54,300.00 325,800.00
6,250,000.00 450,000.00
Jumlah Harga Bahan 777,790.00
837,665.00
xD -
837,665.00
Jadi 1 M' 83,766.50
A.4.6.2 Pekerjaan Kunci & Kaca
A TENAGA
1 Pekerja L.01 OH 0.060
2 Tukang Kayu L.02 OH 0.600
3 Kepala Tukang L.03 OH 0.060
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Ker
B BAHAN
1 Kunci tanam 2 slag (setara belluci) Bh 1.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.015
2 Tukang Kayu L.02 OH 0.150
3 Kepala Tukang L.03 OH 0.015
4 Mandor L.04 OH 0.0008
Jumlah Harga Tenaga Ker
B BAHAN
1 Engsel pintu Bh 1.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang Kayu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.0005
Jumlah Harga Tenaga Ker
B BAHAN
1 Engsel kupu-kupu Bh 1.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.015
2 Tukang Kayu L.02 OH 0.150
3 Kepala Tukang L.03 OH 0.015
4 Mandor L.04 OH 0.008
Jumlah Harga Tenaga Ker
B BAHAN
1 Kait angin Bh 1.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.020
2 Tukang Kayu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.001
Jumlah Harga Tenaga Ker
B BAHAN
1 Kunci slot pintu Bh 1.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 5,700.00
110,000.00 66,000.00
120,000.00 7,200.00
120,000.00 360.00
Jumlah Harga Tenaga Kerja 79,260.00
179,100.00 179,100.00
Jumlah Harga Bahan 179,100.00
-
Jumlah Harga Alat -
258,360.00
xD -
258,360.00
95,000.00 1,425.00
110,000.00 16,500.00
120,000.00 1,800.00
120,000.00 96.00
Jumlah Harga Tenaga Kerja 19,821.00
18,300.00 18,300.00
Jumlah Harga Bahan 18,300.00
-
Jumlah Harga Alat -
38,121.00
xD -
38,121.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 950.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 60.00
Jumlah Harga Tenaga Kerja 13,210.00
10,700.00 10,700.00
Jumlah Harga Bahan 10,700.00
-
Jumlah Harga Alat -
23,910.00
xD -
23,910.00
95,000.00 1,425.00
110,000.00 16,500.00
120,000.00 1,800.00
120,000.00 960.00
Jumlah Harga Tenaga Kerja 20,685.00
10,400.00 10,400.00
Jumlah Harga Bahan 10,400.00
-
Jumlah Harga Alat -
31,085.00
xD -
31,085.00
95,000.00 1,900.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 120.00
Jumlah Harga Tenaga Kerja 26,420.00
17,000.00 17,000.00
Jumlah Harga Bahan 17,000.00
-
Jumlah Harga Alat -
43,420.00
xD -
43,420.00
A.4.7.1 Pekerjaan Pengecatan
A.4.7.1.5 Pengecatan 1 m² bidang kayu baru (1 lapis plamur,1 lapis cat dasar, 3 lapis cat penutu
A TENAGA
1 Pekerja L.01 OH 0.070
2 Tukang Cat L.02 OH 0.105
3 Kepala Tukang L.03 OH 0.004
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Ker
B BAHAN
1 Cat menie Kg 0.200
2 Plamur Kg 0.150
3 Cat dasar Kg 0.170
4 Cat penutup Kg 0.350
5 Kuas Bh 0.010
6 Pengencer Kg 0.030
7 Ampelas Lbr 0.200
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.10 Pengecatan 1 m² tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
1 Pekerja L.01 OH 0.020
2 Tukang Cat L.02 OH 0.063
3 Kepala Tukang L.03 OH 0.0063
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Ker
B BAHAN
1 Plamur Kg 0.100
2 Cat dasar Kg 0.100
3 Cat penutup Kg 0.260
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.10.a Pengecatan 1 m² tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
1 Pekerja L.01 OH 0.020
2 Tukang Cat L.02 OH 0.063
3 Kepala Tukang L.03 OH 0.0063
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Ker
B BAHAN
1 Plamur Kg 0.100
2 Cat dasar Kg 0.100
3 Cat penutup Kg 0.260
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.11 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
1 Pekerja L.01 OH 0.028
2 Tukang Cat L.02 OH 0.042
3 Kepala Tukang L.03 OH 0.0042
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Ker
B BAHAN
1 Cat dasar Kg 0.120
2 Cat penutup Kg 0.180
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.11.a Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
1 Pekerja L.01 OH 0.028
2 Tukang Cat L.02 OH 0.042
3 Kepala Tukang L.03 OH 0.0042
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Ker
B BAHAN
1 Cat dasar Kg 0.120
2 Cat penutup Kg 0.180
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.028
2 Tukang Cat L.02 OH 0.042
3 Kepala Tukang L.03 OH 0.0042
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Ker
B BAHAN
1 Kalkarium Kg 0.100
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.150
2 Tukang Cat L.02 OH 0.001
3 Kepala Tukang L.03 OH 0.0001
4 Mandor L.04 OH 0.0025
Jumlah Harga Tenaga Ker
B BAHAN
1 Kapur sirih Kg 0.150
2 Ampelas Lbr 0.100
3 Alang-alang ikat 0.250
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.040
2 Tukang Cat L.02 OH 0.005
3 Kepala Tukang L.03 OH 0.0005
4 Mandor L.04 OH 0.0025
Jumlah Harga Tenaga Ker
B BAHAN
1 Kapur sirih Kg 0.300
2 Ampelas Lbr 0.200
3 Alang-alang ikat 0.250
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.020
2 Tukang Cat L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.0025
Jumlah Harga Tenaga Ker
B BAHAN
1 Wallpaper m² 1.200
2 Lem Kg 0.200
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.16 Pengecatan 1 m² permukaan baja dengan menie
A TENAGA
1 Pekerja L.01 OH 0.020
2 Tukang Cat L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.0025
Jumlah Harga Tenaga Ker
B BAHAN
1 Menie besi Kg 0.100
2 Kuas Bh 0.010
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.250
2 Tukang Cat L.02 OH 0.225
3 Kepala Tukang L.03 OH 0.0225
4 Mandor L.04 OH 0.0075
Jumlah Harga Tenaga Ker
B BAHAN
1 Menie besi Kg 0.100
2 Pengencer Ltr 0.010
3 Kuas Bh 0.010
4 Perancah kayu m³ 0.002
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.250
2 Tukang Cat L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.0013
Jumlah Harga Tenaga Ker
B BAHAN
1 Menie A Kg 0.100
2 Menie B Kg 0.100
3 Cat Kg 0.080
4 Kuas Bh 0.010
5 Pengencer Ltr 0.010
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.19 Pengecatan 1 m² permukaan baja galvanis secara manual 1 lapis cat mutakhir
A TENAGA
1 Pekerja L.01 OH 0.060
2 Tukang Cat L.02 OH 0.060
3 Kepala Tukang L.03 OH 0.012
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Ker
B BAHAN
1 Cat Kg 0.300
2 Kuas Bh 0.010
3 Pengencer Ltr 0.010
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.400
2 Tukang Cat L.02 OH 0.800
3 Kepala Tukang L.03 OH 0.080
4 Mandor L.04 OH 0.020
Jumlah Harga Tenaga Ker
B BAHAN
1 Cat dasar Kg 0.110
2 Cat antara Kg 0.170
3 Cat penutup Kg 0.080
4 Kuas Bh 0.010
5 Pengencer Ltr 0.010
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.21 Pengecatan 1 m² permukaan baja galvanis secara semprot 3 lapis cat mutakhir
A TENAGA
1 Pekerja L.01 OH 0.400
2 Tukang Cat L.02 OH 0.700
3 Kepala Tukang L.03 OH 0.070
4 Mandor L.04 OH 0.020
Jumlah Harga Tenaga Ker
B BAHAN
1 Cat dasar Kg 0.300
2 Pengencer Ltr 0.010
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
ayu baru (1 lapis plamur,1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 6,650.00
110,000.00 11,550.00
120,000.00 480.00
120,000.00 360.00
Jumlah Harga Tenaga Kerja 19,040.00
48,000.00 9,600.00
31,500.00 4,725.00
42,320.00 7,194.40
54,100.00 18,935.00
22,500.00 225.00
22,100.00 663.00
2,800.00 560.00
Jumlah Harga Bahan 41,902.40
-
Jumlah Harga Alat -
60,942.40
xD -
60,942.40
95,000.00 1,900.00
110,000.00 6,930.00
120,000.00 756.00
120,000.00 360.00
Jumlah Harga Tenaga Kerja 9,946.00
31,500.00 3,150.00
42,320.00 4,232.00
172,000.00 44,720.00
Jumlah Harga Bahan 52,102.00
-
Jumlah Harga Alat -
62,048.00
xD -
62,048.00
aru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 1,900.00
110,000.00 6,930.00
120,000.00 756.00
120,000.00 360.00
Jumlah Harga Tenaga Kerja 9,946.00
31,500.00 3,150.00
42,320.00 4,232.00
50,000.00 13,000.00
Jumlah Harga Bahan 20,382.00
-
Jumlah Harga Alat -
30,328.00
xD -
30,328.00
95,000.00 2,660.00
110,000.00 4,620.00
120,000.00 504.00
120,000.00 360.00
Jumlah Harga Tenaga Kerja 8,144.00
42,320.00 5,078.40
172,000.00 30,960.00
Jumlah Harga Bahan 36,038.40
-
Jumlah Harga Alat -
44,182.40
xD -
44,182.40
95,000.00 2,660.00
110,000.00 4,620.00
120,000.00 504.00
120,000.00 360.00
Jumlah Harga Tenaga Kerja 8,144.00
42,320.00 5,078.40
50,000.00 9,000.00
Jumlah Harga Bahan 14,078.40
-
Jumlah Harga Alat -
22,222.40
xD -
22,222.40
95,000.00 2,660.00
110,000.00 4,620.00
120,000.00 504.00
120,000.00 360.00
Jumlah Harga Tenaga Kerja 8,144.00
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
8,144.00
xD -
8,144.00
95,000.00 14,250.00
110,000.00 110.00
120,000.00 12.00
120,000.00 300.00
Jumlah Harga Tenaga Kerja 14,672.00
-
2,800.00 280.00
-
Jumlah Harga Bahan 280.00
-
Jumlah Harga Alat -
14,952.00
xD -
14,952.00
95,000.00 3,800.00
110,000.00 550.00
120,000.00 60.00
120,000.00 300.00
Jumlah Harga Tenaga Kerja 4,710.00
-
2,800.00 560.00
-
Jumlah Harga Bahan 560.00
-
Jumlah Harga Alat -
5,270.00
xD -
5,270.00
95,000.00 1,900.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 300.00
Jumlah Harga Tenaga Kerja 26,600.00
-
-
Jumlah Harga Bahan -
-
Jumlah Harga Alat -
26,600.00
xD -
26,600.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 1,900.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 300.00
Jumlah Harga Tenaga Kerja 26,600.00
48,000.00 4,800.00
22,500.00 225.00
Jumlah Harga Bahan 5,025.00
-
Jumlah Harga Alat -
31,625.00
xD -
31,625.00
95,000.00 23,750.00
110,000.00 24,750.00
120,000.00 2,700.00
120,000.00 900.00
Jumlah Harga Tenaga Kerja 52,100.00
48,000.00 4,800.00
22,100.00 221.00
22,500.00 225.00
-
Jumlah Harga Bahan 5,246.00
-
Jumlah Harga Alat -
57,346.00
xD -
57,346.00
48,000.00 4,800.00
48,000.00 4,800.00
54,100.00 4,328.00
22,500.00 225.00
22,100.00 221.00
Jumlah Harga Bahan 14,374.00
-
Jumlah Harga Alat -
68,780.00
xD -
68,780.00
95,000.00 5,700.00
110,000.00 6,600.00
120,000.00 1,440.00
120,000.00 360.00
Jumlah Harga Tenaga Kerja 14,100.00
54,100.00 16,230.00
22,500.00 225.00
22,100.00 221.00
Jumlah Harga Bahan 16,676.00
-
Jumlah Harga Alat -
30,776.00
xD -
30,776.00
95,000.00 38,000.00
110,000.00 88,000.00
120,000.00 9,600.00
120,000.00 2,400.00
Jumlah Harga Tenaga Kerja 138,000.00
42,320.00 4,655.20
-
54,100.00 4,328.00
22,500.00 225.00
22,100.00 221.00
Jumlah Harga Bahan 9,429.20
-
Jumlah Harga Alat -
147,429.20
xD -
147,429.20
95,000.00 38,000.00
110,000.00 77,000.00
120,000.00 8,400.00
120,000.00 2,400.00
Jumlah Harga Tenaga Kerja 125,800.00
42,320.00 12,696.00
22,100.00 221.00
Jumlah Harga Bahan 12,917.00
-
Jumlah Harga Alat -
138,717.00
xD -
138,717.00
A.5.1.1 Pekerjaan Sanitasi Gedung
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Batu L.02 OH 1.500
3 Kepala Tukang L.03 OH 0.150
4 Mandor L.04 OH 0.050
Jumlah Harga Tenaga Ker
B BAHAN
1 Closet jongkok unit 1.000
2 Semen portland Kg 6.000
3 Pasir pasang m³ 0.010
4 Bata merah Bh 7.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Ker
B BAHAN
1 Floor drain unit 1.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.19 Pemasangan 1 buah kran Ø ½" atau ¾"
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang Batu L.02 OH 0.400
3 Kepala Tukang L.03 OH 0.040
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Kerja x 1
B BAHAN
1 Kran air m' 1.000
2 Sealtape Bh 0.025
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.036
2 Tukang Batu L.02 OH 0.060
3 Kepala Tukang L.03 OH 0.006
4 Mandor L.04 OH 0.002
Jumlah Harga Tenaga Ker
B BAHAN
1 Pipa PVC ½" m' 1.200
2 Perlengkapan % 35.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.26 Pemasangan 1 m' pipa PVC tipe AW Ø ¾"
A TENAGA
1 Pekerja L.01 OH 0.036
2 Tukang Batu L.02 OH 0.060
3 Kepala Tukang L.03 OH 0.006
4 Mandor L.04 OH 0.002
Jumlah Harga Tenaga Ker
B BAHAN
1 Pipa PVC ¾" m' 1.200
2 Perlengkapan % 35.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.081
2 Tukang Batu L.02 OH 0.135
3 Kepala Tukang L.03 OH 0.0135
4 Mandor L.04 OH 0.004
Jumlah Harga Tenaga Ker
B BAHAN
1 Pipa PVC 4" m' 1.200
2 Perlengkapan % 35.000
Jumlah Harga Baha
C PERALATAN
Jumlah Harga Al
D Jumlah ( A + B + C )
E Overhead & Profit 0%
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 95,000.00
110,000.00 165,000.00
120,000.00 18,000.00
120,000.00 6,000.00
Jumlah Harga Tenaga Kerja 284,000.00
182,900.00 182,900.00
1,500.00 9,000.00
85,000.00 850.00
-
Jumlah Harga Bahan 192,750.00
-
Jumlah Harga Alat -
476,750.00
xD -
476,750.00
95,000.00 950.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 600.00
Jumlah Harga Tenaga Kerja 13,750.00
15,000.00 15,000.00
Jumlah Harga Bahan 15,000.00
-
Jumlah Harga Alat -
28,750.00
xD -
28,750.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 950.00
110,000.00 44,000.00
120,000.00 4,800.00
120,000.00 600.00
Jumlah Harga Tenaga Kerja x 1/4 12,587.50
25,900.00 25,900.00
-
Jumlah Harga Bahan 25,900.00
-
Jumlah Harga Alat -
38,487.50
xD -
38,487.50
95,000.00 3,420.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 240.00
Jumlah Harga Tenaga Kerja 10,980.00
5,275.00 6,330.00
52.75 1,846.25
Jumlah Harga Bahan 8,176.25
-
Jumlah Harga Alat -
19,156.25
xD -
19,156.25
Harga Satuan Jumlah Harga
(Rp) (Rp)
95,000.00 3,420.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 240.00
Jumlah Harga Tenaga Kerja 10,980.00
6,775.00 8,130.00
67.75 2,371.25
Jumlah Harga Bahan 10,501.25
-
Jumlah Harga Alat -
21,481.25
xD -
21,481.25
95,000.00 7,695.00
110,000.00 14,850.00
120,000.00 1,620.00
120,000.00 480.00
Jumlah Harga Tenaga Kerja 24,645.00
46,925.00 56,310.00
469.25 16,423.75
Jumlah Harga Bahan 72,733.75
-
Jumlah Harga Alat -
97,378.75
xD -
97,378.75