Anda di halaman 1dari 60

Curah Hujan

Kejadian Simongan
No.
Tahun Tanggal Bulan (Sta 42)
1 2005 6 April 100
2 2006 28 Januari 150
3 2007 4 Desember 200
4 2008 21 Februari 50
5 2009 8 Februari 25
6 2010 20 Februari 75
7 2011 18 November 100
8 2012 12 Januari 200
9 2013 23 Februari 250
10 2014 4 Februari 125
R max Tahunan
No Tahun
(Xi) log (Xi)
1 2005 100 2.00
2 2006 150 2.18
3 2007 200 2.30
4 2008 50 1.70
5 2009 25 1.40
6 2010 75 1.88
7 2011 100 2.00
8 2012 200 2.30
9 2013 250 2.40
10 2014 125 2.10
Rata-rata 127.50 2.02
Sd 72.12 0.31
Cs 0.33 -0.90
Ck -0.82 0.58
Cv 0.57 0.15
Normal Log

Distribusi Normal :
XT = X rata + Kx
X5 = 127.50 + 0.84
= 188.08 mm

X100 = 127.50 + 2.33


= 295.54 mm

X1000 = 127.50 + 3.09


= 350.35 mm
Distribusi Log Normal
log Xt = log X rata + k x
log X5 = 2.02 + 0.84
log X5 = 2.28
X5 = 191.22 mm

log X100 = 2.02 + 2.33


log X100 = 2.74
X100 = 546.34 mm

Distribusi Log Pearson Tipe III Cs/G =


PU = 5 tahun
log Xt = log X rata + k (pearson) x

log X5 = 2.02 + 0.854


log X5 = 2.29
X5 = 193.12 mm
Cs/G =
PU =100 tahun
log X100 = 2.02 + 1.66
log X100 = 2.53
X100 = 340.76 mm

Distribusi Gumbel

XT = Xrata-rata + kx

YTr  Yn
K 
Sn
 Tr  1
YTr   ln   ln
 Tr  
Tr = 5 th
ytr = 1.500
k = 1.058

X5 = Xrata-rata + kx
= 127.50 + 1.058
= 203.81 mm

Tr = 100 th
ytr = 4.600
k = 4.323

X100 = Xrata-rata + kx
= 127.50 + 4.323
= 439.26 mm

Distibusi
No. PU
Normal Log Normal Log Pearson III Gumbel
1 5 th 188.08 191.22 193.12 203.81
2 100 th 295.54 546.34 340.76 439.26
arial

Sd
72.12

72.12

72.12

Sd log
0.31

0.31

-0.9 k=0.854

pearson) x Sd log

0.31

-0.9 k=1.660
=100 tahun
0.31

Jumlah Data =10


Periode Yt Yn Sn Xt
2 0.4952 0.9496
Sd 5 0.4952 0.9496
10 0.4952 0.9496
25 0.4952 0.9496
50 0.4952 0.9496
100 0.4952 0.9496
Rata-rata

Sd
72.12

Sd
72.12
R max Tahunan
No Tahun (Xi-X) (Xi-X)2 (Xi-X)3 (Xi-X)4 P(X)
(Xi)
1 1995 85.86 -42.66 1819.49 -77611.33 3310549.97
2 1996 106 -22.52 506.95 -11414.18 256996.01
3 1997 124 -4.52 20.39 -92.07 415.74
4 1998 289 160.48 25755.27 4133322.39 663334176.95
5 1999 119 -9.52 90.54 -861.58 8198.35
6 2000 179 50.48 2548.68 128669.07 6495793.91
7 2001 88.51 -40.01 1600.44 -64026.40 2561408.29
8 2002 64.94 -63.58 4041.84 -256962.27 16336504.54
9 2003 64.59 -63.93 4086.47 -261229.61 16699233.39
10 2004 142.75 14.23 202.62 2884.21 41055.27
11 2005 52.66 -75.86 5754.06 -436476.86 33109170.58
12 2006 198 69.48 4828.10 335477.82 23310508.48
13 2007 162 33.48 1121.21 37543.21 1257115.77
14 2008 169 40.48 1638.99 66353.88 2686303.76
15 2009 216 87.48 7653.54 669565.92 58576639.94
16 2010 110 -18.52 342.82 -6347.55 117528.12
17 2011 83 -45.52 2071.66 -94292.67 4291778.22
18 2012 80 -48.52 2353.75 -114193.54 5540156.67
19 2013 111 -17.52 306.79 -5373.63 94121.79
20 2014 125 -3.52 12.36 -43.45 152.74
jumlah 2570.31 0.00 66755.99 4044891.37 838027808.47
Rata-rata 128.52

Periode Yt Yn Sn Xt
2 0.366513 0.5236 1.0628 119.7544
5 1.49994 0.5236 1.0628 182.968
10 2.250367 0.5236 1.0628 224.8209
25 3.218876 0.5236 1.0628 278.8366
50 3.912023 0.5236 1.0628 317.4949
100 4.60517 0.5236 1.0628 356.1531
Rata-rata 246.6713
59.27456

0.461225

1.13581

0.233529

3.394338
R max Tahunan
No Tahun Log Xi (Log Xi - Log X) (Log Xi - Log X)2
(Xi)
1 1995 85.86 1.93 -0.1343 0.0180
2 1996 106 2.03 -0.0428 0.0018
3 1997 124 2.09 0.0253 0.0006
4 1998 289 2.46 0.3928 0.1543
5 1999 119 2.08 0.0075 0.0001
6 2000 179 2.25 0.1848 0.0341
7 2001 88.51 1.95 -0.1211 0.0147
8 2002 64.94 1.81 -0.2556 0.0653
9 2003 64.59 1.81 -0.2579 0.0665
10 2004 142.75 2.15 0.0865 0.0075
11 2005 52.66 1.72 -0.3466 0.1201
12 2006 198 2.30 0.2286 0.0522
13 2007 162 2.21 0.1414 0.0200
14 2008 169 2.23 0.1598 0.0255
15 2009 216 2.33 0.2664 0.0709
16 2010 110 2.04 -0.0267 0.0007
17 2011 83 1.92 -0.1490 0.0222
18 2012 80 1.90 -0.1650 0.0272
19 2013 111 2.05 -0.0228 0.0005
20 2014 125 2.10 0.0288 0.0008
Jumlah 2570.31 41.36 0.0000 0.7034
Rata-rata 128.52 2.07

Rekap
S Cv Cs Ck slogx
0.1924 0.0930 0.1457 0.1475 0.1924

T Kt Rt2 Xt
2 0 128.52 128.5155
5 0.84 128.52 128.67712
10 1.28 128.52 128.76177
25 1.71 128.52 128.84451
50 2.05 128.52 128.90992
100 2.33 128.52 128.9638
(log Xi - Log X) 3 (Log Xi - Log X)4

-0.0024 0.0003
-0.0001 0.0000
0.0000 0.0000
0.0606 0.0238
0.0000 0.0000
0.0063 0.0012
-0.0018 0.0002
-0.0167 0.0043
-0.0172 0.0044
0.0006 0.0001
-0.0416 0.0144
0.0119 0.0027
0.0028 0.0004
0.0041 0.0007
0.0189 0.0050
0.0000 0.0000
-0.0033 0.0005
-0.0045 0.0007
0.0000 0.0000
0.0000 0.0000
0.0177 0.0587 slogx 0.192402
0.192401779

0.093033433

0.145707124

0.147477396
R max Tahunan
No Tahun Log Xi (Log Xi - Log X) (Log Xi - Log X)2
(Xi)
1 1995 85.86 1.93 -0.1343 0.0180
2 1996 106 2.03 -0.0428 0.0018
3 1997 124 2.09 0.0253 0.0006
4 1998 289 2.46 0.3928 0.1543
5 1999 119 2.08 0.0075 0.0001
6 2000 179 2.25 0.1848 0.0341
7 2001 88.51 1.95 -0.1211 0.0147
8 2002 64.94 1.81 -0.2556 0.0653
9 2003 64.59 1.81 -0.2579 0.0665
10 2004 142.75 2.15 0.0865 0.0075
11 2005 52.66 1.72 -0.3466 0.1201
12 2006 198 2.30 0.2286 0.0522
13 2007 162 2.21 0.1414 0.0200
14 2008 169 2.23 0.1598 0.0255
15 2009 216 2.33 0.2664 0.0709
16 2010 110 2.04 -0.0267 0.0007
17 2011 83 1.92 -0.1490 0.0222
18 2012 80 1.90 -0.1650 0.0272
19 2013 111 2.05 -0.0228 0.0005
20 2014 125 2.10 0.0288 0.0008
Jumlah 2570.31 41.36 0.0000 0.7034
Rata-rata 128.52 2.07
S 0.1924 2.46
Cv 0.0930 1.72 0.74
Cs 0.1457 0.19
Ck 0.1475 1.63 2.56
slogx 0.1924

Log pearson III


No Periode Peluang S.LogX LogX Cs
1 2 50 0.1924 2.07 0.145707124
2 5 20 0.1924 2.07 0.145707124
3 10 10 0.1924 2.07 0.145707124
4 25 4 0.1924 2.07 0.145707124
5 50 2 0.1924 2.07 0.145707124
6 100 1 0.1924 2.07 0.145707124

koefisien k
0.2 -0.033 0.831 1.301 1.818 2.159
0.146 -0.024 0.834 1.2961 1.80018 2.13092
0.1 -0.017 0.836 1.292 1.785 2.107

perhitungan peringkat curah hujan

Tahun Rmax Ranking Rmax P = m/(n+1) P(%)


1995 85.86 1 52.66 0.05 4.76
1996 106 2 64.59 0.10 9.52
1997 124 3 64.94 0.14 14.29
1998 289 4 80 0.19 19.05
1999 119 5 83 0.24 23.81
2000 179 6 85.86 0.29 28.57
2001 88.51 7 88.51 0.33 33.33
2002 64.94 8 106 0.38 38.10
2003 64.59 9 110 0.43 42.86
2004 142.75 10 111 0.48 47.62
2005 52.66 11 119 0.52 52.38
2006 198 12 124 0.57 57.14
2007 162 13 125 0.62 61.90
2008 169 14 142.75 0.67 66.67
2009 216 15 162 0.71 71.43
2010 110 16 169 0.76 76.19
2011 83 17 179 0.81 80.95
2012 80 18 198 0.86 85.71
2013 111 19 216 0.90 90.48
2014 125 20 289 0.95 95.24
jumlah 2570.31
Rata-rata 128.52
S 0.19
(log Xi - Log X) 3 (Log Xi - Log X)4

-0.0024 0.0003
-0.0001 0.0000
0.0000 0.0000
0.0606 0.0238
0.0000 0.0000
0.0063 0.0012
-0.0018 0.0002
-0.0167 0.0043
-0.0172 0.0044
0.0006 0.0001
-0.0416 0.0144
0.0119 0.0027
0.0028 0.0004
0.0041 0.0007
0.0189 0.0050
0.0000 0.0000
-0.0033 0.0005
-0.0045 0.0007
0.0000 0.0000
0.0000 0.0000
0.0177 0.0587 slogx 0.192402

1.63
1.81
2.00
2.18
2.37
2.55
2.70

k Y (Log Xt) Xt No.


-0.02436 2.0634 115.7193
0.8337 2.2285 169.2381
1.29614 2.3175 207.7172
1.80018 2.4145 259.6873
2.13092 2.4781 300.6669
2.433 2.5362 343.7213
2.472 2.763 3.38
2.433 2.71278 3.3
2.4 2.67 3.235

log R max k P'(x<) (%) Dmax


1.72 -1.80 2.7454 2.70
1.81 -1.34 7.5121 -2.01
1.81 -1.33 7.6779 -6.61
1.90 -0.86 18.5023 -0.55
1.92 -0.77 21.1529 -2.66
1.93 -0.70 23.843 -4.73
1.95 -0.63 26.4568 -6.88
2.03 -0.22 38.0327 -0.06
2.04 -0.14 44.7541 1.90
2.05 -0.12 45.5009 -2.12
2.08 0.04 59.4107 7.03
2.09 0.13 64.0014 6.86
2.10 0.15 64.8737 2.97
2.15 0.45 74.7415 8.07
2.21 0.74 80.2593 8.83
2.23 0.83 81.9407 5.75
2.25 0.96 85.512 4.56
2.30 1.19 88.7073 2.99
2.33 1.38 91.6912 1.22
2.46 2.04 97.3386 2.10
41.36
2.07
0.19
0.192401779

Of Ef f2
1 4 2.25
0.093033433 4 4 0.00
7 4 2.25
4 4 0.00
4 4 0.00
20 4.5
0.145707124

No. Probabilitas Of Ef f2= ((Of-Ef)2)/Ef


1 1,63 < P < 1,81 1 4 2.25
2 1,81 < P < 2,00 6 4 1
0.147477396 3 2,00 < P < 2,18 7 4 2.25
4 2,18 < P < 2,37 5 4 0.25
5 2,37 < P < 2,55 1 4 2.25
Jumlah 20 20 8
Distribusi syarat Hasil Keterangan
Normal Cs = 0 -0.8228 Tidak Memenuhi

Log Normal Ck = 3 . Cv
0.1475 Tidak Memenuhi

0.225
Gumbel Cs = 1,1396 1.1358 Mendekat
Ck = 5,4002 0.2335 Tidak Memenuhi
Log Person III Cs ≠ 0 0.1457 Mendekat
Durasi Periode Ulang (tahun)
(menit) 2 5 10 25 50 100
5 210.28 307.53 377.45 471.88 546.35 624.58
10 132.47 193.73 237.78 297.27 344.18 393.46
15 101.09 147.84 181.46 226.86 262.66 300.27
20 83.45 122.04 149.79 187.27 216.82 247.87 700.00
45 48.60 71.08 87.24 109.06 126.27 144.35
60 40.12 58.67 72.01 90.03 104.24 119.16 600.00 f(x) = 1826
120 25.27 36.96 45.36 56.71 65.66 75.07
180 19.29 28.21 34.62 43.28 50.11 57.29 500.00 f(x) = 1597
240 15.92 23.28 28.58 35.73 41.37 47.29 f(x) = 1379
300 13.72 20.07 24.63 30.79 35.65 40.75 400.00
f(x) = 1103
300.00
f(x) = 899.2

200.00
f(x) = 614.8

100.00

0.00
0 50

Td Δt It It*Td Δp pt hyetograph
(jam) (jam) (mm/jam) (mm) (mm) (%) (%) (mm) 140.000
1 0-1 72.012 72.012 72.012 62.996 11.486 23.858
120.000
2 42036 45.364 90.729 18.717 16.374 62.996 130.854

Intensitas Hujan (mm/jam)


3 42065 34.620 103.859 13.130 11.486 16.374 34.012 100.000
4 42097 28.578 114.311 10.453 9.144 9.144 18.994
80.000
Jumlah 114.311 100.000 100.000 207.717
60.000

40.000

20.000

0.000
700.00
T = 2 Tahun
Power (T = 2 Tahun)
600.00 f(x) = 1826.2917645671 x^-0.6666666667 Power (T = 2 Tahun)
T = 5 Tahun
500.00 f(x) = 1597.5315033048 x^-0.6666666667 Power (T = 5 Tahun)
Power (T = 5 Tahun)
f(x) = 1379.7946817368 x^-0.6666666667 T = 10 Tahun
400.00 Power (T = 10 Tahun)
Power (T = 10 Tahun)
f(x) = 1103.6624678267 x^-0.6666666667
T = 25 Tahun
300.00 Power (T = 25 Tahun)
f(x) = 899.211794971 x^-0.6666666667
Power (T = 25 Tahun)
T = 50 Tahun
200.00
f(x) = 614.8507739778 x^-0.6666666667 Power (T = 50 Tahun)
Power (T = 50 Tahun)
100.00 T = 100 Tahun
Power (T = 100 Tahun)
Power (T = 100 Tahun)
0.00
0 50 100 150 200 250 300 350

140.000

120.000
Intensitas Hujan (mm/jam)

100.000

80.000

60.000

40.000

20.000

0.000
1 2 3 4
Waktu (jam)
Jam P (mm) CN S Pe (mm)
1 23.858 84 48.381 3.215
2 130.854 84 48.381 86.601
3 34.012 84 48.381 8.144
4 18.994 84 48.381 1.505
∑ 207.7172 99.465

ttk berat Das panjang toA DAS


1 2,598.05 7,076.86 7,545,163.19 7.545163
2 3,007.65
3 3,421.63
4 4,735.74
rata2 3,440.76
t=Tp*X Q=Qp*Y V A
X Y
Jam m3/dt m3
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.5 1.56 0.79 0.56 1556.33 0.43 432.31 672.82

1 3.11 1.00 0.70 3515.63 0.98 976.56 3433.23

1.5 4.67 0.93 0.65 3773.84 1.05 1048.29 3956.08


2 6.22 0.79 0.56 3370.87 0.94 936.35 3156.33
2.5 7.78 0.66 0.46 2850.82 0.79 791.90 2257.55
3 9.33 0.54 0.38 2354.81 0.65 654.11 1540.31 Hidrogra
3.5 10.89 0.44 0.31 1921.22 0.53 533.67 1025.31
0.80
4 12.44 0.35 0.25 1556.10 0.43 432.25 672.62 De
4.5 14.00 0.29 0.20 1254.50 0.35 348.47 437.16 bit 0.70
Pu
5 15.55 0.23 0.16 1008.16 0.28 280.05 282.33 nca
0.60
5.5 17.11 0.18 0.13 808.38 0.22 224.55 181.52 k
(m
3/d 0.50
6 18.66 0.15 0.10 647.12 0.18 179.75 116.32
t/
6.5 20.22 0.12 0.08 517.38 0.14 143.72 74.36 m 0.40
m)
7 21.77 0.09 0.07 413.25 0.11 114.79 47.44 0.30

7.5 23.33 0.07 0.05 329.82 0.09 91.62 30.22 0.20

8 24.88 0.06 0.04 263.07 0.07 73.08 19.22 0.10


w
8.5 26.44 0.05 0.03 209.73 0.06 58.26 12.22 0.00
0.00 5.00 10.0
9 27.99 0.04 0.03 167.13 0.05 46.42 7.76

9.5 29.55 0.03 0.02 133.14 0.04 36.98 4.92

10 31.10 0.02 0.02 106.03 0.03 29.45 3.12

10.5 32.66 0.02 0.01 84.42 0.02 23.45 1.98

11 34.21 0.02 0.01 67.20 0.02 18.67 1.25

11.5 35.77 0.01 0.01 53.48 0.01 14.85 0.79

12 37.32 0.01 0.01 42.55 0.01 11.82 0.50

12.5 38.88 0.01 0.01 33.86 0.01 9.40 0.32

0.70 27038.82 4.18 4181.00 17935.70

Jam (t) X Y Q=Qp*Y A V (m3) Qtotal P18

0 0.00 0.00 0.00 0.00 0.00 0.00 120.35265 0

1 0.31 0.50 0.61 0.08 85.48 1089.84 120352.65 2

2 0.63 0.90 1.09 0.22 672.18 3056.21 2

3 0.94 1.00 1.21 0.30 1233.81 4140.59 4.92

4 1.25 0.98 1.18 0.31 1331.41 4301.25 9.92


5 1.57 0.91 1.10 0.30 1214.73 4108.46 10.86

6 1.88 0.83 1.00 0.27 1029.67 3782.57 20.39

7 2.19 0.74 0.90 0.25 839.60 3415.67 24.39

8 2.51 0.66 0.80 0.22 669.08 3049.15 39.39

9 2.82 0.58 0.70 0.19 525.41 2702.01 40.39

10 3.13 0.51 0.62 0.17 408.47 2382.44 79.09

11 3.45 0.45 0.54 0.15 315.32 2093.20 84.39

12 3.76 0.39 0.48 0.13 242.13 1834.27 86.89

13 4.08 0.34 0.42 0.12 185.20 1604.19

14 4.39 0.30 0.36 0.10 141.21 1400.80


15 4.70 0.26 0.32 0.09 107.41 1221.71
16 5.02 0.23 0.28 0.08 81.54 1064.47
17 5.33 0.20 0.24 0.07 61.80 926.72
18 5.64 0.17 0.21 0.06 46.78 806.27
19 5.96 0.15 0.18 0.05 35.37 701.08
20 6.27 0.13 0.16 0.04 26.72 609.32

21 6.58 0.11 0.14 0.04 20.17 529.37

22 6.90 0.10 0.12 0.03 15.21 459.74


23 7.21 0.09 0.10 0.03 11.47 399.16
24 7.52 0.07 0.09 0.02 8.64 346.47
3.31 9308.80 46024.97
Hidrograf Satuan Kali Semarang
0.80

0.70

0.60

0.50

0.40

0.30

0.20

0.10
waktu (jam)
0.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00

Akibat Hujan Efektif (m


Jam (t) X Y Q=Qp*Y
P31 3.215

3.5 0 5 0 0.00 0.00 0.00 0.00

3.5 2 5 1 0.32 0.52 0.36 1.16

4.25 2 5.75 2 0.64 0.91 0.64 2.05

2.27 4.92 3.77 3 0.96 1.00 0.70 2.25

2.27 9.92 3.77 4 1.29 0.97 0.68 2.19


1.8 10.86 3.3 5 1.61 0.90 0.63 2.02

1.8 20.39 3.3 6 1.93 0.81 0.57 1.83

0 24.39 1.5 7 2.25 0.73 0.51 1.63

0 39.39 1.5 8 2.57 0.64 0.45 1.45

0.65 40.39 2.15 9 2.89 0.57 0.40 1.27

0.65 79.09 2.15 10 3.22 0.50 0.35 1.11

3.25 84.39 4.75 11 3.54 0.43 0.30 0.97

3.25 86.89 4.75 12 3.86 0.38 0.26 0.85

13 4.18 0.33 0.23 0.74

14 4.50 0.29 0.20 0.64


15 4.82 0.25 0.17 0.56
16 5.14 0.21 0.15 0.48
17 5.47 0.19 0.13 0.42
18 5.79 0.16 0.11 0.36
19 6.11 0.14 0.10 0.31
20 6.43 0.12 0.08 0.27

21 6.75 0.10 0.07 0.24

22 7.07 0.09 0.06 0.20


23 7.40 0.08 0.05 0.18
24 7.72 0.07 0.05 0.15
Flood Routing
T T Qi
Jam detik m3/dt
1 2 3

0 0.00

3600
1 1.16
3600
2 49.43
3600
3 88.81
3600
4 105.81
3600

5 108.81

3600

6 103.06

3600

7 94.21

3600

8 84.55

3600

9 75.07

3600

10 66.19

3600

11 58.09

3600

12 50.81

Akibat Hujan Efektif (mm) Debit Total Volume 3600

8.144 18.994 (m3/dt) m3 13 44.33


130.854
0.00 0 3600

0.00 1.16 1164.01 14 38.61

47.38 0.00 49.43 49432.05 3600

83.61 2.95 0.00 88.81 88809.40 15 33.57

91.54 5.20 6.88 105.81 105809.09 3600


88.95 5.70 12.14 108.81 108809.01 16 29.16

82.40 5.54 13.29 103.06 103057.50 3600

74.54 5.13 12.91 94.21 94209.75 17 25.31

66.51 4.64 11.96 84.55 84552.23 3600

58.84 4.14 10.82 75.07 75068.83 18 21.94

51.76 3.66 9.65 66.19 66189.89 3600

45.35 3.22 8.54 58.09 58087.56 19 19.02

39.62 2.82 7.51 50.81 50806.94 3600

34.54 2.47 6.58 44.33 44329.48 20 16.47

30.06 2.15 5.75 38.61 38605.57 3600


26.13 1.87 5.01 33.57 33571.92 21 14.26
22.69 1.63 4.36 29.16 29160.96 3600
19.68 1.41 3.79 25.31 25306.04 22 12.34
17.06 1.22 3.29 21.94 21944.03 3600
14.78 1.06 2.86 19.02 19016.69 23 10.68
12.80 0.92 2.48 16.47 16471.16 3600

11.08 0.80 2.15 14.26 14260.00 24 9.23

9.59 0.69 1.86 12.34 12340.96


8.30 0.60 1.61 10.68 10676.68
7.17 0.52 1.39 9.23 9234.20
203336.10
Vi H Qo Vo Vs S
Keterangan
m3 m m3/dt m3 m3 m3
4 5 6 7 8 9 10

0.00 0.00 10 0 0.00 0.00 4 pompa @ 5 m3/dt

1164.01 0.02 10 10000 -8835.99 -8835.99 4 pompa @ 5 m3/dt

49432.05 0.73 35 35000 14432.05 5596.06 4 pompa @ 5 m3/dt

88809.40 1.31 35 35000 53809.40 59405.46 5 pompa @ 5 m3/dt

105809.09 1.56 35 35000 70809.09 130214.55 6 pompa @ 5 m3/dt

6 pompa @ 5 m3/dt & 2


108809.01 1.60 35 35000 73809.01 204023.56
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


103057.50 1.52 35 35000 68057.50 272081.06
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


94209.75 1.39 35 35000 59209.75 331290.81
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


84552.23 1.24 35 35000 49552.23 380843.03
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


75068.83 1.10 35 35000 40068.83 420911.86
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


66189.89 0.97 35 35000 31189.89 452101.75
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


58087.56 0.85 35 35000 23087.56 475189.30
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


50806.94 0.75 35 35000 15806.94 490996.24
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


44329.48 0.65 35 35000 9329.48 500325.72
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


38605.57 0.57 35 35000 3605.57 503931.29
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


33571.92 0.49 35 35000 -1428.08 502503.20
pompa @ 2,5 m3/dt
6 pompa @ 5 m3/dt & 2
29160.96 0.43 30 30000 -839.04 501664.17
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


25306.04 0.37 27.5 27500 -2193.96 499470.21
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


21944.03 0.32 22.5 22500 -555.97 498914.23
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 2


19016.69 0.28 20 20000 -983.31 497930.92
pompa @ 2,5 m3/dt

6 pompa @ 5 m3/dt & 1


16471.16 0.24 17.5 17500 -1028.84 496902.08
pompa @ 2,5 m3/dt

14260.00 0.21 15 15000 -740.00 496162.08 6 pompa @ 5 m3/dt

12340.96 0.18 12.5 12500 -159.04 496003.04 5 pompa @ 5 m3/dt

10676.68 0.16 10 10000 676.68 496679.72 4 pompa @ 5 m3/dt

3 pompa @ 5 m3/dt & 1


9234.20 0.14 10 10000 -765.80 495913.92
pompa @ 2,5 m3/dt
\
Kapasitas
Kolam Retensi 2 6
11 2.5 5

CUKUP 5 30 35

CUKUP

CUKUP Kapasitas Kolam Retensi v


6.8 68000
CUKUP ha m2 238000

CUKUP

CUKUP
Debit Puncak (m3/dt)

CUKUP

CUKUP

CUKUP 120.00

waktu (jam)
CUKUP

CUKUP 100.00

CUKUP

CUKUP
80.00

CUKUP

CUKUP
60.00

CUKUP

40.00
CUKUP
40.00

CUKUP

CUKUP

20.00
CUKUP

CUKUP

0.00
CUKUP
0 1 2 3 4 5 6 7 8

CUKUP

CUKUP

CUKUP
Q inflow
Q outflow
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Q Q Volume Kolam Volume
Jam Keterangan
Inflow Outflow Retensi Tampungan
0 0.00 10 238000 0.00 CUKUP
1 1.16 10 238000 -8835.99 CUKUP
2 49.43 35 238000 14432.05 CUKUP
3 88.81 0 238000 53809.40 CUKUP
4 105.81 35 238000 70809.09 CUKUP
5 108.81 35 238000 73809.01 CUKUP
6 103.06 35 238000 68057.50 CUKUP
7 94.21 35 238000 59209.75 CUKUP
8 84.55 35 238000 49552.23 CUKUP

9 75.07 35 238000 40068.83 CUKUP

10 66.19 35 238000 31189.89 CUKUP

11 58.09 35 238000 23087.56 CUKUP

12 50.81 35 238000 15806.94 CUKUP

13 44.33 35 238000 9329.48 CUKUP

14 38.61 35 238000 3605.57 CUKUP

15 33.57 35 238000 -1428.08 CUKUP

16 29.16 30 238000 -839.04 CUKUP

17 25.31 27.5 238000 -2193.96 CUKUP

18 21.94 22.5 238000 -555.97 CUKUP

19 19.02 20 238000 -983.31 CUKUP

20 16.47 17.5 238000 -1028.84 CUKUP

21 14.26 15 238000 -740.00 CUKUP

22 12.34 12.5 238000 -159.04 CUKUP

23 10.68 10 238000 676.68 CUKUP

24 9.23 10 238000 -765.80 CUKUP

Q inflow
Q outflow
t=Tp*X Q=Qp*Y V A
X Y
Jam m3/dt m3
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.5 1.97 0.79 0.37 1323.84 0.37 367.73 486.82
1 3.94 1.00 0.47 2990.46 0.83 830.68 2484.13
1.5 5.91 0.93 0.44 3210.11 0.89 891.70 2862.44
2 7.88 0.79 0.37 2867.33 0.80 796.48 2283.77
2.5 9.85 0.66 0.31 2424.97 0.67 673.60 1633.46
3 11.82 0.54 0.25 2003.05 0.56 556.40 1114.50 Hidrogra
3.5 13.79 0.44 0.21 1634.23 0.45 453.95 741.86 0.50
4 15.76 0.35 0.17 1323.65 0.37 367.68 486.68 De 0.45
4.5 17.73 0.29 0.13 1067.10 0.30 296.42 316.31 bit 0.40
Pu 0.35
5 19.70 0.23 0.11 857.57 0.24 238.21 204.28 nca
5.5 21.67 0.18 0.09 687.63 0.19 191.01 131.34 k 0.30
6 23.64 0.15 0.07 550.45 0.15 152.90 84.17 (m 0.25
3/d
6.5 25.61 0.12 0.06 440.09 0.12 122.25 53.80 0.20
t/
7 27.58 0.09 0.04 351.51 0.10 97.64 34.32 m 0.15
m) 0.10
7.5 29.55 0.07 0.04 280.55 0.08 77.93 21.86
8 31.52 0.06 0.03 223.77 0.06 62.16 13.91 0.05
8.5 33.49 0.05 0.02 178.40 0.05 49.56 8.84 0.00
0.00 5.00 10.0
9 35.46 0.04 0.02 142.16 0.04 39.49 5.61
9.5 37.43 0.03 0.01 113.25 0.03 31.46 3.56 w
10 39.40 0.02 0.01 90.19 0.03 25.05 2.26
10.5 41.37 0.02 0.01 71.81 0.02 19.95 1.43
11 43.34 0.02 0.01 57.16 0.02 15.88 0.91
11.5 45.31 0.01 0.01 45.49 0.01 12.64 0.57
12 47.28 0.01 0.00 36.20 0.01 10.05 0.36
12.5 49.25 0.01 0.00 28.80 0.01 8.00 0.23
0.47 22999.77 4.18 4181.00 12977.46

Jam (t) X Y Q=Qp*Y A V (m3) Qtotal P18


0 0.00 0.00 0.00 0.00 0.00 0.00 120.35265 0
1 0.31 0.50 0.61 0.08 85.48 1089.84 120352.65 2
2 0.63 0.90 1.09 0.22 672.18 3056.21 2
3 0.94 1.00 1.21 0.30 1233.81 4140.59 4.92
4 1.25 0.98 1.18 0.31 1331.41 4301.25 9.92
5 1.57 0.91 1.10 0.30 1214.73 4108.46 10.86
6 1.88 0.83 1.00 0.27 1029.67 3782.57 20.39
7 2.19 0.74 0.90 0.25 839.60 3415.67 24.39
8 2.51 0.66 0.80 0.22 669.08 3049.15 39.39
9 2.82 0.58 0.70 0.19 525.41 2702.01 40.39
10 3.13 0.51 0.62 0.17 408.47 2382.44 79.09
11 3.45 0.45 0.54 0.15 315.32 2093.20 84.39
12 3.76 0.39 0.48 0.13 242.13 1834.27 86.89
13 4.08 0.34 0.42 0.12 185.20 1604.19
14 4.39 0.30 0.36 0.10 141.21 1400.80
15 4.70 0.26 0.32 0.09 107.41 1221.71
16 5.02 0.23 0.28 0.08 81.54 1064.47
17 5.33 0.20 0.24 0.07 61.80 926.72
18 5.64 0.17 0.21 0.06 46.78 806.27
19 5.96 0.15 0.18 0.05 35.37 701.08
20 6.27 0.13 0.16 0.04 26.72 609.32
21 6.58 0.11 0.14 0.04 20.17 529.37
22 6.90 0.10 0.12 0.03 15.21 459.74
23 7.21 0.09 0.10 0.03 11.47 399.16
24 7.52 0.07 0.09 0.02 8.64 346.47
3.31 9308.80 46024.97

panjang sun 13.326 km


titik berat 4.6 km
Hidrograf Satuan Kali Semarang
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00

waktu (jam)

Akibat Hujan Efektif (m


Jam (t) X Y Q=Qp*Y
P31 3.215
3.5 0 5 0 0.00 0.00 0.00 0.00
3.5 2 5 1 0.25 0.36 0.17 0.55
4.25 2 5.75 2 0.51 0.80 0.38 1.21
2.27 4.92 3.77 3 0.76 0.97 0.45 1.46
2.27 9.92 3.77 4 1.02 1.00 0.47 1.51
1.8 10.86 3.3 5 1.27 0.97 0.46 1.47
1.8 20.39 3.3 6 1.52 0.92 0.43 1.39
0 24.39 1.5 7 1.78 0.86 0.40 1.29
0 39.39 1.5 8 2.03 0.79 0.37 1.19
0.65 40.39 2.15 9 2.28 0.72 0.34 1.08
0.65 79.09 2.15 10 2.54 0.65 0.31 0.98
3.25 84.39 4.75 11 2.79 0.59 0.28 0.89
3.25 86.89 4.75 12 3.05 0.53 0.25 0.80
13 3.30 0.48 0.22 0.72
14 3.55 0.43 0.20 0.65
15 3.81 0.39 0.18 0.58
16 4.06 0.35 0.16 0.52
17 4.31 0.31 0.15 0.47
18 4.57 0.28 0.13 0.42
19 4.82 0.25 0.12 0.37
20 5.08 0.22 0.10 0.33
21 5.33 0.20 0.09 0.30
22 5.58 0.18 0.08 0.27
23 5.84 0.16 0.07 0.24
24 6.09 0.14 0.07 0.21
Flood Routing
T T Qi
Jam detik m3/dt
1 2 3
0 0.00
3600
1 0.55
3600
2 23.61
3600
3 52.21
3600
4 67.25
3600
5 73.83
3600
6 73.75
3600
7 70.57
3600
8 66.01
3600
9 60.91
3600
10 55.73
3600
11 50.69
3600
12 45.91
Akibat Hujan Efektif (mm) Debit Total Volume 3600
130.854 8.144 18.994 (m3/dt) m3 13 41.45
0.00 0 3600
0.00 0.55 550.18 14 37.34
22.39 0.00 23.61 23606.18 3600
49.36 1.39 0.00 52.21 52211.98 15 33.57
59.42 3.07 3.25 67.25 67253.30 3600
61.49 3.70 7.16 73.83 73829.23 16 30.14
59.91 3.83 8.62 73.75 73750.22 3600
56.62 3.73 8.93 70.57 70568.43 17 27.03
52.60 3.52 8.70 66.01 66006.81 3600
48.34 3.27 8.22 60.91 60914.40 18 24.22
44.10 3.01 7.63 55.73 55730.82 3600
40.04 2.74 7.02 50.69 50688.79 19 21.68
36.21 2.49 6.40 45.91 45909.74 3600
32.66 2.25 5.81 41.45 41452.57 20 19.40
29.40 2.03 5.26 37.34 37340.10 3600
26.42 1.83 4.74 33.57 33574.09 21 17.34
23.71 1.64 4.27 30.14 30144.09 3600
21.25 1.48 3.83 27.03 27032.82 22 15.50
19.04 1.32 3.44 24.22 24219.43 3600
17.04 1.18 3.09 21.68 21681.60 23 13.85
15.24 1.06 2.76 19.40 19396.76 3600
13.62 0.95 2.47 17.34 17342.92 24 12.36
12.17 0.85 2.21 15.50 15499.08
10.87 0.76 1.98 13.85 13845.52
9.71 0.68 1.77 12.36 12363.93
203336.10
Vi H Qo Vo Vs S
Keterangan
m3 m m3/dt m3 m3 m3
4 5 6 7 8 9 10
0.00 0.00 0 0 0.00 0.00 0 pompa @ 2 m3/dt

550.18 0.00 2 2000 -1449.82 -1449.82 1 pompa @ 2 m3/dt

23606.18 0.18 10 10000 13606.18 12156.36 5 pompa @ 2 m3/dt

52211.98 0.40 10 10000 42211.98 54368.34 5 pompa @ 2 m3/dt

67253.30 0.52 10 10000 57253.30 111621.64 5 pompa @ 2 m3/dt

73829.23 0.57 10 10000 63829.23 175450.87 5 pompa @ 2 m3/dt

73750.22 0.57 10 10000 63750.22 239201.10 5 pompa @ 2 m3/dt

70568.43 0.54 10 10000 60568.43 299769.52 5 pompa @ 2 m3/dt

66006.81 0.51 10 10000 56006.81 355776.33 5 pompa @ 2 m3/dt

60914.40 0.47 10 10000 50914.40 406690.73 5 pompa @ 2 m3/dt

55730.82 0.43 10 10000 45730.82 452421.55 5 pompa @ 2 m3/dt

50688.79 0.39 10 10000 40688.79 493110.35 5 pompa @ 2 m3/dt

45909.74 0.35 10 10000 35909.74 529020.09 5 pompa @ 2 m3/dt

41452.57 0.32 10 10000 31452.57 560472.66 5 pompa @ 2 m3/dt

37340.10 0.29 10 10000 27340.10 587812.76 5 pompa @ 2 m3/dt

33574.09 0.26 10 10000 23574.09 611386.85 5 pompa @ 2 m3/dt

30144.09 0.23 10 10000 20144.09 631530.95 5 pompa @ 2 m3/dt

27032.82 0.21 10 10000 17032.82 648563.76 5 pompa @ 2 m3/dt

24219.43 0.19 10 10000 14219.43 662783.20 5 pompa @ 2 m3/dt

21681.60 0.17 10 10000 11681.60 674464.79 5 pompa @ 2 m3/dt

19396.76 0.15 10 10000 9396.76 683861.55 5 pompa @ 2 m3/dt

17342.92 0.13 10 10000 7342.92 691204.47 5 pompa @ 2 m3/dt


15499.08 0.12 10 10000 5499.08 696703.55 5 pompa @ 2 m3/dt

13845.52 0.11 10 10000 3845.52 700549.07 5 pompa @ 2 m3/dt

12363.93 0.10 10 10000 2363.93 702913.00 5 pompa @ 2 m3/dt


Kapasitas
Kolam Retensi 2 6
11 2.5 5
CUKUP 5 30 35

CUKUP

CUKUP Kapasitas Kolam Retensi v


9.7 97000
CUKUP ha m2 194000

CUKUP

CUKUP

CUKUP
Debit Puncak (m3/dt)

CUKUP

CUKUP 80.00

CUKUP
70.00
CUKUP

CUKUP waktu (jam)


60.00
CUKUP

CUKUP 50.00

CUKUP

CUKUP 40.00

CUKUP
30.00
CUKUP

CUKUP
20.00

CUKUP

CUKUP 10.00

CUKUP

0.00
0 1 2 3 4 5 6 7 8
10.00

0.00
CUKUP 0 1 2 3 4 5 6 7 8

CUKUP

CUKUP
Q inflow
Q outflow

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Jam Q Inflow Q Outflow
Volume Kolam
Volume
Retensi
Tampungan
Keterangan
0 0 0 194000 0 CUKUP
1 0.5501767 2 194000 -1449.823 CUKUP
2 23.606181 10 194000 13606.181 CUKUP
3 52.211982 0 194000 42211.982 CUKUP
4 67.253302 10 194000 57253.302 CUKUP
5 73.829231 10 194000 63829.231 CUKUP
6 73.750224 10 194000 63750.224 CUKUP
7 70.568429 10 194000 60568.429 CUKUP
8 66.006806 10 194000 56006.806 CUKUP
9 60.914399 10 194000 50914.399 CUKUP
10 55.730824 10 194000 45730.824 CUKUP
11 50.688795 10 194000 40688.795 CUKUP
12 45.909741 10 194000 35909.741 CUKUP
13 41.45257 10 194000 31452.57 CUKUP
14 37.340101 10 194000 27340.101 CUKUP
15 33.574091 10 194000 23574.091 CUKUP
16 30.144094 10 194000 20144.094 CUKUP
17 27.032819 10 194000 17032.819 CUKUP
18 24.219431 10 194000 14219.431 CUKUP
19 21.681598 10 194000 11681.598 CUKUP
20 19.396761 10 194000 9396.761 CUKUP
21 17.342917 10 194000 7342.9168 CUKUP
22 15.499076 10 194000 5499.0762 CUKUP
23 13.845522 10 194000 3845.5222 CUKUP
24 12.363934 10 194000 2363.9337 CUKUP

Q inflow
Q outflow
Polder Kali Banger Tanah Mas Tawang
Aspek Semarang

Status Pengelola 5 10 7 7

Pemahaman Visi 10 15 15 10
dan Misi

Kemandirian 5 5 15 5
Badan Pengelola
Badan Pengelola
Pengelolaan 10 20 10 10
Polder
Keterwakilan 10 20 20 10
Masyarakat
Implementasi 10 20 20 20
Hasil Rapat
Jumlah 50 90 87 62

Pemanfaatan 5 5 10 10
Lahan

Kesadaran
Masyarakat 3 3 3 5
terhadap Polder

Pengaruh
Genangan 15 15 15 15
Sebelum ada
Kepuasan Polder
Pelanggan
Jaminan
Kemampuan 20 5 10 20
Polder
Kualitas Air dari 10 5 5 5
Polder
Feed Back `10 0 10 10
Pelanggan

Keluhan dan 5 5 10 5
Penanganannya

Jumlah 58 38 63 70
Sumber Dana 5 5 20 5
Pembangunan

Sumber Dana OP 10 10 15 5

Penentuan Tarif
Keuangan 5 20 15 5
Masyarakat
Keuangan

Kecukupan Dana 15 15 25 15

Transparansi 5 15 15 5
Keuangan
Jumlah 40 65 90 35

Pemahaman Staf
Harian terhadap 15 15 15 15
Visi dan Misi

Strategi
Pengendalian 15 10 10 10
Muka Air
Perencanaan OP 10 15 15 10
Polder
Proses Internal Petugas Operasi
15 15 5 15
dan OP
Sistem 15 15 15 10
Administrasi

Bangunan Sarana 10 10 10 10
dan Prasarana

Pengumpulan
Data dan 8 10 5 5
Pemanfaatan
Jumlah 88 90 75 75

Perencanaan 10 15 0 10
Pelathan Pekerja

Penilaian Kinerja 10 15 0 5
Staf
Penilaian
Pembelajaran 10 0 15 10
Suasana Kerja
dan
Pertumbuhan Pengembangan
SI 10 15 0 0

Pengembangan 10 20 20 10
Peralatan
Pengembangan
Sistem 10 0 20 10
Pengelolaan
Jumlah 60 65 55 45
Efektvitas
Pengendalian 67 86
Banjir
P Koes
7
15
10
10
20
20
82
10
3
15
10
5
15
10
68
15
15
15
25
15
85
15
10
15
15
15
10
5
85
0
0
15
0
10
20
45
Bidang Kritis Kali Semarang Bobot Banger Bob0t Tanah Mas

Badan Pengelola 50 16.89 10.00 90 18.00 87

Kepuasan Pelanggan 58 19.59 11.60 38 7.60 63

Keuangan 40 13.51 8.00 65 13.00 90

Proses Internal 88 29.73 17.60 90 18.00 75

Pembelajaran dan Pertumbuhan 60 20.27 12.00 65 13.00 55

Efektvitas 67 86

296 100 348 370

Tawang
1
100.00

50.00
5 2
14.00
9.00 12.40
0.00
7.00
15.00

4 3

Tanah Mas
1
100.00

50.00
5 2
12.60
11.00 17.40
0.00
15.00 18.00
100.00

50.00
5 2
12.60
11.00 17.40
0.00
15.00 18.00

4 3
Bobot Tawang Bobot

17.40 62 12.40Badan Pengelola


27%
12.60 70 14.00
Kepuasan Pelanggan
20%

18.00 35 7.00 Keuangan


19%
15.00 75 15.00Proses Internal
18%
11.00 45 Pembelajaran
9.00 dan Pengembangan
16%
0.00 0.00

287 57.4

Kali Semarang
1
100.00

50.00
5 2
11.60
12.00 10.00
0.00
8.00
17.60

4 3

Banger
1
100.00

50.00
5 2
7.60
13.00 18.00
0.00

18.00 13.00
100.00

50.00
5 2
7.60
13.00 18.00
0.00

18.00 13.00

4 3
Bidang Krits Kali Semarang Banger Tanah Mas

Keuangan 40 7.6 65 12.35 90 17.1

Kepuasan Pelanggan 58 11.6 38 7.6 63 12.6

Badan Pengelola 50 13.5 90 24.3 87 23.49

Proses Internal 88 15.84 90 16.2 75 13.5

Pembelajaran dan Pengembangan 60 9.6 65 10.4 55 8.8

296 50.54 283 58.5 280 58.39


7.6 12.35 17.1

50.54 58.5 58.39

Kali Semarang Banger


Badan Pengelola Badan Pengelola
100 100
Efektvitas
67 58
Kepuasan Pelanggan Efektvitas 86 90
50
50 50 38
2 0 0
60 40 65 65
Pembelajaran dan Pertumbuhan Keuangan Pembelajaran dan Pertumbuhan
88 90
Proses Internal Proses Internal

2
2
Tawang
Polder Kali Semarang Pol
35 6.65

70 14
Keuangan
20
62 16.74 10
Pembelajaran dan Pengembangan 11.6 Kepuasan Pelanggan Pembelajaran dan Pengembang
9.6 7.6
75 13.5 0

45 7.2 15.84 13.5

Proses Internal Badan Pengelola Proses


252 51.44
6.65

51.44

Banger
Bidang KritKali Semarang Banger
Badan Pengelola
100
Efektvitas 86 90 Kepuasan Pelanggan
50 38 Finansial 7.6
0

65 65
aran dan Pertumbuhan Keuangan Kepuasan Pelanggan
90
Proses Internal
Badan Pengelola

Proses Internal

Pembelajaran dan Pertumbuhan


Polder Banger Polder Tanah Mas

Keuangan Keuangan

30 30

10 Pembelajaran dan Pengembangan 10


17.1 Kepuasan Pelangga
Pembelajaran dan Pengembangan 12.35 7.6 Kepuasan Pelanggan 12.6
10.4 8.8
-10 -10

13.5
16.2 23.49
24.3
Proses Internal Badan Pengelola Proses Internal Badan Pengelola

Tanah Mas Tawang


ah Mas Polder Tawang

Keuangan Keuangan
30 30

10
17.1 Kepuasan Pelanggan Pembelajaran dan Pengembangan 10 Kepuasan Pelanggan
12.6 14
7.2 6.65
-10 -10

13.5 16.74
23.49
Badan Pengelola Proses Internal Badan Pengelola
Kategori Badan Pengelola
Kepuasan Pelanggan Keuangan
Badan Pengelola 1 9 9
Kepuasan Pelanggan 7 1 8
Keuangan 5 8 1
Proses Internal 6 6 5
Pembelajaran dan Pengembangan 6 5 5
25 29 28

Kategori Badan Pengelola KP KU


BP 0.04 0.31 0.32
KP 0.28 0.03 0.29
KU 0.20 0.28 0.04
PI 0.24 0.21 0.18
PP 0.24 0.17 0.18

Kategori BP (0,25) KP (0,21) KU (0,18)


BP 1 9 9
KP 7 1 8
KU 5 8 1
PI 6 6 5
PP 6 5 5
25 29 28

Kategori BP (0,42) KP (0,34) KU (0,30)


BP 0.25 1.85 1.63
KP 1.77 0.21 1.45
KU 1.26 1.64 0.18
PI 1.51 1.23 0.91
PP 1.51 1.03 0.91

6.98 0.25 27.65


5.76 0.21 28.07
5.27 : 0.18 29.08
5.38 0.19 28.36
4.95 0.17 28.88
142.04
consistensi
28.40828 5.85 5.27

Anda mungkin juga menyukai