1 Data Operasi

Kebutuhan Gas 8 BBTUD


Waktu Operasi 6 jam 1 bar 100,000 Pascal
Tekanan operasi (deadstock 28 bar 0.1 MPa
pressure)
2.8 MPa

2 Data CNG Skid


jumlah tube / skid 8 tube Data CNG Skid di Pasaran
Kapasitas skid 5,330 m3 10 tube
188,227 SCF CNG EG Weldship SWeldship J
Tekanan ≈ CNGEG 12 tube 2,700 psia SCF 193,245 166,795 179,768
184 bar m3 5,472 4,723 5,090
18.4 MPa psia
Panjang 12 m bar
Lebar 2.5 m 1 bar 14.7 psia
Maksimum tumpukan 3 tumpuk
Jarak antara skid 1.5 m
jarak skid - fence 2 m

3 Perhitungan
Kebutuhan Gas 9.20 BBTUD
GHV 1,000 BTU/SCF
1 BBTUD 1,000 MMBTUD
1 SCF 0.0283 m3
Volume Gas Operasi 9.20 MMSCFD
260,515 m3
Volume Deadstock 34,964 m3
Total Volume Gas 295,478
Kebutuhan CNG Skid 56.00 unit 18.67
Jumlah tumpukan 19 tumpuk
konfigurasi 5 x 4 56.50 565.00
Kebutuhan Lokasi CNG Plant 22.50 537.50
Panjang 68.5 m 1,271 1,102.50
Lebar 18.5 m
Luas area CNG Plant 1,267.25 m2
harga skid 180,000 usd/skid
Investasi 10,080,000

10080000
231,894 154,424
6,566 4,373
2,700
184

m2
m2
1 Data Operasi
Kebutuhan Gas 10 BBTUD
Waktu Operasi 6 jam 1 bar 100,000 Pascal
Tekanan operasi (deadstock 50 bar 0.1 MPa
pressure)
5 MPa

2 Data CNG Skid


jumlah tube / skid 10 tube Data CNG Skid di Pasaran
Kapasitas skid 6,800 m3 10 tube
Tekanan ≈ CNGEG 12 tube 2,700 psia SCF 193,245 166,795 179,768 231,894
184 bar m3 5,472 4,723 5,090 6,566
18.4 MPa psia 2,700
Panjang 12 m bar 184
Lebar 2.5 m 1 bar 14.7 psia
Maksimum tumpukan 3 tumpuk
Jarak antara skid 1.5 m 183.6735
jarak skid - fence 2 m

3 Perhitungan 50
Kebutuhan Gas 11 BBTUD
GHV 1,000 BTU/SCF 735
1 BBTUD 1,000 MMBTUD 0.272
1 SCF 0.0283 m3
Volume Gas Operasi 11 MMSCFD
311,485 m3
Volume Deadstock 24,980 m3
Total Volume Gas 336,464
Kebutuhan CNG Skid 50.00 unit
Jumlah tumpukan 17 tumpuk
konfigurasi 5 x 4 565.00 m2
Kebutuhan Lokasi CNG Plant 537.50 m2
Panjang 68.5 m 1,102.50
Lebar 18.5 m
Luas area CNG Plant 1,267.25 m2
321,360
9,100

14