Anda di halaman 1dari 136

PEMERINTAH KABUPATEN KUTAI KARTANEGARA

DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
01 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJAAN


TANGGUNG JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
(YA/TIDAK)
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
02 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
03 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
PEMERINTAH KABUPATEN KUTAI KARTANEGARA 4 Electrical Winch 50 T
5 Electrical Winch 5 T
DINAS BINA MARGA DAN SUMBER DAYA AIR 6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG
PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
04 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
PEMERINTAH KABUPATEN KUTAI KARTANEGARA 10 Alat Potong
DINAS BINA MARGA DAN SUMBER DAYA AIR 11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
05 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
06 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
07 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

PEMERINTAH KABUPATEN KUTAI KARTANEGARA

DINAS BINA MARGA DAN SUMBER DAYA AIR

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
08 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
09 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No
PEMERINTAH KABUPATEN KUTAI KARTANEGARA JENIS JAM LOKASI KONTRAKTOR
JABATAN
DINAS BINA MARGA DAN SUMBER DAYA1AIRHujan Lebat
1 Site Engineer (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
10 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
11 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
7 DINAS BINA MARGA DAN SUMBER DAYA7AIR
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
12 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
(YA/TIDAK)
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
3 Inspector
DINAS BINA MARGA DAN SUMBER DAYA3AIRBanjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
13 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11 PEMERINTAH KABUPATEN KUTAI KARTANEGARA
12
DINAS BINA MARGA DAN SUMBER DAYA AIR
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
14 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL
C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15 PEMERINTAH KABUPATEN KUTAI KARTANEGARA
16 DINAS BINA MARGA DAN SUMBER DAYA AIR
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
15 - April - 2012
Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara
Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18 PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR

F. PELAPORAN/ ............................................................................................
URAIAN
KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
16 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU
Halaman : BUKU HARIAN STANDAR
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA
AIR CATATAN HARIAN
Tanggal : .......
17 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
18 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
19 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
PEMERINTAH KABUPATEN KUTAI KARTANEGARA5 Electrical Winch 5 T
DINAS BINA MARGA DAN SUMBER DAYA AIR 6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ
TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
20 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10
PEMERINTAH KABUPATEN KUTAI KARTANEGARA Alat Potong
DINAS BINA MARGA DAN SUMBER DAYA AIR11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
21 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU
Halaman : BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
22 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
23 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

PEMERINTAH KABUPATEN KUTAI KARTANEGARA

DINAS BINA MARGA DAN SUMBER DAYA AIR

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
24 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
25 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAHPEMERINTAH
LOKASIKABUPATEN
No KUTAI JENIS JAM
KARTANEGARA LOKASI
JABATAN
1 Site Engineer 1 Hujan
DINAS BINA MARGA Lebat DAYA AIR
DAN SUMBER
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
26 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan
PEMERINTAH KABUPATEN air
KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
27 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
7 7 DAN SUMBER DAYA AIR
DINAS BINA MARGA
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
28 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
3 Inspector 3 Banjir/Genangan
DINAS BINA MARGA DAN SUMBER airDAYA AIR
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
29 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12 PEMERINTAH KABUPATEN KUTAI KARTANEGARA
13 DINAS BINA MARGA DAN SUMBER DAYA AIR

14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
30 - April - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14 PEMERINTAH KABUPATEN KUTAI KARTANEGARA
15
16 DINAS BINA MARGA DAN SUMBER DAYA AIR
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
31 - Mei - 2012
Kegiatan : Perebahan Pylon Jembatan Kutai Kart
Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18 PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS
KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : BUKU HARIAN STANDAR


CATATAN HARIAN
Tanggal : .......
01 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
TANDA TANGAN DAN DINAS BINA MARGA DAN SUMBER DAYA AIR
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU
Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT PEKERJAAN
TANGGUNG JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS
Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman :

tan Kutai Kartanegara


A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS
Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman :

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL
LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman :
tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS
tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
01 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJAAN


TANGGUNG JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
(YA/TIDAK)
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
02 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
03 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG
PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
04 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
05 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
06 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
07 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
08 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG
PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
09 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
10 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
11 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
12 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
(YA/TIDAK)
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
13 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
14 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL
C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
15 - Mei - 2012
Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara
Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN
KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU

PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
16 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kartanegara


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTASI


Cacah/ LOKASI
No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
Volume ASAL

C. PEMAKAIAN PERALATAN
CACAH/
No JENIS PERALATAN LOKASI No
AKTIF
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT TANGGUNG


PEKERJAAN JAWAB
TUGAS
No CACAH LOKASI No JENIS JAM LOKASI KONTRAKTOR
JABATAN
1 Site Engineer 1 Hujan Lebat (YA/TIDAK)
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
URAIAN

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ .....................
......./ TAMU
Halaman :
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA BUKU HARIAN STANDAR
AIR CATATAN HARIAN
Tanggal : .......
17 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman :
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
18 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman :
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
19 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ
TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 01
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
20 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 02 PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
21 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU
Halaman : 03
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
22 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 04
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
23 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 05
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
24 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker
D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ
TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 06
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
25 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 07 PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
26 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 08
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
27 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 09
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
28 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 10
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
29 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 11
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
30 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS
C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 12 PEMERINTAH KABUPATEN KUTAI KARTANEGARA


DINAS BINA MARGA DAN SUMBER DAYA AIR
BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
31 - Mei - 2012
Kegiatan : Perebahan Pylon Jembatan Kutai Kart
Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS
KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU

Halaman : 13
PEMERINTAH KABUPATEN KUTAI KARTANEGARA
DINAS BINA MARGA DAN SUMBER DAYA AIR BUKU HARIAN STANDAR
CATATAN HARIAN
Tanggal : .......
01 - Mei - 2012

Kegiatan : Perebahan Pylon Jembatan Kutai Kart


Kontraktor : PT. HUTAMA KARYA
Konsultan : CV. TRI DAYA KREASI

A. PEKERJAAN B. ALAT/MATERIAL TIBA ATAU MUTA


LOKASI TUJUAN No KODE JENIS PEKERJAAN VOLUME % LOKASI No JENIS

C. PEMAKAIAN PERALATAN
JENIS
Idle Rusak No JENIS PERALATAN
PERALATAN
1 Ponton 180 Feet
2 Tug Boat
3 Crane 50 Ton
4 Electrical Winch 50 T
5 Electrical Winch 5 T
6 Hydraulic Jack
7 Genset 100 Kva
8 Crane on Truck
9 Welding Set
10 Alat Potong
11 Kunci-kunci
12 Alat Ukur
13 Crane 120 Ton
14 Concrete Breker

D. PERSONIL KONSULTAN, E. CUACA/BENCANA ALAM/KEJADIAN PENGHAMBAT PEKERJ


TUGAS
AKIBAT No CACAH LOKASI No JENIS JAM LOKASI
JABATAN
1 Site Engineer 1 Hujan Lebat
2 Chief Inspector 2 Gerimis
3 Inspector 3 Banjir/Genangan air
4 Surveyor 4 Longsor
5 5
6 6
7 7
8 8
9
10
11
12
13
14
15
16
17
18

F. PELAPORAN/ ............................................................................................
TANDA TANGAN DAN
URAIAN
NAMA JELAS

KONSULTAN PENGAWAS

BINA MARGA
ATASAN LANGSUNG /
ATASAN ........................ ....................
......../ TAMU
Halaman : 14

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT PEKERJAAN
TANGGUNG JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman : 15

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman : 16

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman : 17

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman : 18

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS
Halaman : 19

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman : 20

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman : 21

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman : 22

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman : 23

tan Kutai Kartanegara


A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS
Halaman : 24

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman : 25

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS

Halaman : 26

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN
MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman : 27

tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL
LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS

Halaman : 28
tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)

TANDA TANGAN DAN


NAMA JELAS
tan Kutai Kartanegara

A ATAU MUTASI
Cacah/ LOKASI
LOKASI TUJUAN
Volume ASAL

LATAN
CACAH/ JENIS
LOKASI No Idle Rusak
AKTIF PERALATAN

MBAT TANGGUNG
PEKERJAAN JAWAB
KONTRAKTOR AKIBAT
(YA/TIDAK)
TANDA TANGAN DAN
NAMA JELAS
LAPORAN KESELAMATAN KERJA

PROGRAM : Peningkatan Jalan Dan Jembatan


KEGIATAN : Pembangunan Badan Jalan Desa Suka Damai Kec. Muara Badak
LOKASI : desa Suka Damai Kec. Muara Badak
TANGGAL :
KRITERIAL

NO JUMLAH TENAGA KERJA Helm K. Mata Rompi K. Tangan Sepatu Jumlah

1 Manager Pelaksana Roda 2


2 Manager Teknik Roda Empat
3 Petugas K3 Roda Sepuluh
4 Mandor' Helm Proyek
5 Kepala Tukang Masker
6 Tukang sarung tangan
7 Operator Pelindung Mata
8 Helper Pelindung Teling
Rompi

INSIDENT HARAPAN HASIL JAM KERJA

Tenaga Kerja : Mulai


Luka Ringan 0 Insident Istirahat
Luka Sedang 0 Insident Selesai
Luka Berat 0 Insident INSTR

Material

Tumpahan Bahan Kimia 0 Insident

Solar 0 Insident

Bensin 0 Insident

Oil 0 Insident
Peralatan

Rusak Ringan 0 Insident

Rusak Sedang 0 Insident

Rusak Berat 0 Insident

Di Periksa
KONSULTAN PENGAWAS

Tomy Priyanto
Inspector
ERJA

11 2019
KETERANGAN

Jumlah Peralatan

Roda Empat
Roda Sepuluh
Helm Proyek

sarung tangan
Pelindung Mata
Pelindung Telinga

INSTRUKSI
Di Buat Oleh
KONTRAKTOR PELAKSANA

MUHRIM SETIAWAN

Eliezer Feriyanto,A.Md
Petugas K3
LAPORAN KESELAMATAN KERJA

PROGRAM : Peningkatan Jalan Dan Jembatan


KEGIATAN : Pembangunan Badan Jalan Desa Suka Damai Kec. Muara Badak
LOKASI : desa Suka Damai Kec. Muara Badak
TANGGAL :
KRITERIAL

NO JUMLAH TENAGA KERJA Helm K. Mata Rompi K. Tangan Sepatu Jumlah

1 Manager Pelaksana Roda 2


2 Manager Teknik Roda Empat
3 Petugas K3 Roda Sepuluh
4 Mandor' Helm Proyek
5 Kepala Tukang Masker
6 Tukang sarung tangan
7 Operator Pelindung Mata
8 Helper Pelindung Teling
Rompi

INSIDENT HARAPAN HASIL JAM KERJA

Tenaga Kerja : Mulai


Luka Ringan 0 Insident Istirahat
Luka Sedang 0 Insident Selesai
Luka Berat 0 Insident INSTR

Material

Tumpahan Bahan Kimia 0 Insident

Solar 0 Insident

Bensin 0 Insident

Oil 0 Insident
Peralatan

Rusak Ringan 0 Insident

Rusak Sedang 0 Insident

Rusak Berat 0 Insident

Di Periksa
KONSULTAN PENGAWAS

Tomy Priyanto
Inspector
ERJA

10 2019
KETERANGAN

Jumlah Peralatan

Roda Empat
Roda Sepuluh
Helm Proyek

sarung tangan
Pelindung Mata
Pelindung Telinga

INSTRUKSI
Di Buat Oleh
KONTRAKTOR PELAKSANA

MUHRIM SETIAWAN

Eliezer Feriyanto,A.Md
Petugas K3
LAPORAN KESELAMATAN KERJA

PROGRAM : Peningkatan Jalan Dan Jembatan


KEGIATAN : Pembangunan Badan Jalan Desa Suka Damai Kec. Muara Badak
LOKASI : desa Suka Damai Kec. Muara Badak
TANGGAL :
KRITERIAL

NO JUMLAH TENAGA KERJA Helm K. Mata Rompi K. Tangan Sepatu Jumlah

1 Manager Pelaksana Roda 2


2 Manager Teknik Roda Empat
3 Petugas K3 Roda Sepuluh
4 Mandor' Helm Proyek
5 Kepala Tukang Masker
6 Tukang sarung tangan
7 Operator Pelindung Mata
8 Helper Pelindung Teling
Rompi

INSIDENT HARAPAN HASIL JAM KERJA

Tenaga Kerja : Mulai


Luka Ringan 0 Insident Istirahat
Luka Sedang 0 Insident Selesai
Luka Berat 0 Insident INSTR

Material

Tumpahan Bahan Kimia 0 Insident

Solar 0 Insident

Bensin 0 Insident

Oil 0 Insident
Peralatan

Rusak Ringan 0 Insident

Rusak Sedang 0 Insident

Rusak Berat 0 Insident

Di Periksa
KONSULTAN PENGAWAS

Tomy Priyanto
Inspector
ERJA

9 2019
KETERANGAN

Jumlah Peralatan

Roda Empat
Roda Sepuluh
Helm Proyek

sarung tangan
Pelindung Mata
Pelindung Telinga

INSTRUKSI
Di Buat Oleh
KONTRAKTOR PELAKSANA

MUHRIM SETIAWAN

Eliezer Feriyanto,A.Md
Petugas K3
LAPORAN KESELAMATAN KERJA

PROGRAM : Peningkatan Jalan Dan Jembatan


KEGIATAN : Pembangunan Badan Jalan Desa Suka Damai Kec. Muara Badak
LOKASI : desa Suka Damai Kec. Muara Badak
TANGGAL :
KRITERIAL

NO JUMLAH TENAGA KERJA Helm K. Mata Rompi K. Tangan Sepatu Jumlah

1 Manager Pelaksana Roda 2


2 Manager Teknik Roda Empat
3 Petugas K3 Roda Sepuluh
4 Mandor' Helm Proyek
5 Kepala Tukang Masker
6 Tukang sarung tangan
7 Operator Pelindung Mata
8 Helper Pelindung Teling
Rompi

INSIDENT HARAPAN HASIL JAM KERJA

Tenaga Kerja : Mulai


Luka Ringan 0 Insident Istirahat
Luka Sedang 0 Insident Selesai
Luka Berat 0 Insident INSTR

Material

Tumpahan Bahan Kimia 0 Insident

Solar 0 Insident

Bensin 0 Insident

Oil 0 Insident
Peralatan

Rusak Ringan 0 Insident

Rusak Sedang 0 Insident

Rusak Berat 0 Insident

Di Periksa
KONSULTAN PENGAWAS

Tomy Priyanto
Inspector
ERJA

8 2019
KETERANGAN

Jumlah Peralatan

Roda Empat
Roda Sepuluh
Helm Proyek

sarung tangan
Pelindung Mata
Pelindung Telinga

INSTRUKSI
Di Buat Oleh
KONTRAKTOR PELAKSANA

MUHRIM SETIAWAN

Eliezer Feriyanto,A.Md
Petugas K3

Anda mungkin juga menyukai