Anda di halaman 1dari 83

DAFTAR UPAH PEKERJA

SUMBER DATA : PASARAN BEBAS


D A E R A H : KABUPATEN PONOROGO
Edisi Maret 2017

DAFTAR UPAH PEKERJA


NO TENAGA KERJA SATUAN HARGA A HARGA B
1 2 3 4 5

1 MANDOR org 80,000.00 85,000.00

2 KEPALA TK. GALI TANAH org 75,000.00 80,000.00


3 KEPALA TK. BATU org 75,000.00 80,000.00

4 KEPALA TK. KAYU org 75,000.00 80,000.00

5 KEPALA TK. BESI org 75,000.00 80,000.00

7 KEPALA TK. LISTRIK org 75,000.00 80,000.00

9 TUKANG BATU org 70,000.00 75,000.00

10 TUKANG KAYU org 70,000.00 75,000.00

11 TUKANG BESI org 70,000.00 75,000.00

16 TUKANG LISTRIK org 70,000.00 75,000.00

23 MEKANIK org 75,000.00 80,000.00

25 OPERATOR org 70,000.00 75,000.00

26 PENGEMUDI/SOPIR org 65,000.00 70,000.00

29 PENJAGA MALAM org 60,000.00 65,000.00

30 SOPIR MATERIAL/TRUCK oh 65,000.00 70,000.00

31 OPERATOR (FINISHER, BULLDOZER) oh 70,000.00 75,000.00

32 OPERATOR SEMI TERLATIH oh 65,000.00 70,000.00

35 PEKERJA oh 60,000.00 65,000.00


Edisi Maret 2017
STANDAR SATUAN HARGA BARANG DAN UPAH BIDANG SARANA DA
KABUPATEN PONOROGO TAHUN ANGGARAN 2017

DAFTAR HARGA BAHAN


NO JENIS BAHAN BANGUNAN SATUAN
1 2 3
I BAHAN ATAP DAN PLAFOND
1 Genteng Kodok Glazur bh
3 Genteng bubung kodok glazzur bh
4 Seng gelombang 3" x 6" bjls 28 lbr
5 Plywood tebal 9 mm (120 x 240) lbr
6 Gypsum Board 120 x 240 Tebal 9 mm lbr
7 Triplek 4 mm 120 x 240 lbr
8 Triplek 9 mm 120 x 240 lbr
9 Seng Plat 3' x 6' BJLS 28 lbr

II BAHAN MENGGUNAKAN KAYU


1 Dolken kayu Ø 8 - 10 /400 cm btg
2 Jenis kayu balok
Kelas I (kayu jati) m³
Kelas II (kayu kalimantan/borneo) m³
Kelas III (kayu kamper) m³
Kelas III (kayu kruing) m³
Kelas IV (kayu meranti/kayu lokal) m³
3 Jenis kayu usuk/kaso
Kelas I (kayu jati) m³
Kelas II (kayu kalimantan/borneo) m³
Kelas III (kayu kamper) m³
Kelas III (kayu kruing) m³
Kelas IV (kayu meranti/kayu lokal) m³
4 Jenis kayu papan
Kelas I (kayu jati) m³
Kelas II (kayu kalimantan/borneo) m³
Kelas III (kayu kamper) m³
Kelas III (kayu kruing) m³
Kelas IV (kayu meranti/kayu lokal) m³
5 Jenis kayu reng
Kelas I (kayu jati) m³
Kelas II (kayu kalimantan/borneo) m³
Kelas III (kayu kamper) m³
Kelas III (kayu kruing) m³
Kelas IV (kayu meranti/kayu lokal) m³
12 Perancah Kayu m³
13 Kayu papan 3/20 lbr
16 Bambu Ø 6 - 8 /600 cm btg
17 Minyak bekisting liter
18 Kayu Bakar m3
19 Bambu Ori btg

III BAHAN MENGGUNAKAN PASIR/BATU/SEMEN


1 Batu belah 15/20 m³
7 Batu pecah 3/5 m³
3 Batu pecah 2/3 m³
4 Pasir beton m³
5 Pasir pasang m³
6 Pasir urug m³
7 Tanah Urug m³
8 Sirtu m³
9 Kerikil Sungai Disaring m³
10 Kerikil Sungai tak Disaring m³
11 Semen Warna kg
12 Semen Portland (Gresik 50 kg) kg
13 Semen Nat kg
14 Residu liter
15 Air liter

IV BAHAN MENGGUNAKAN BESI/LOGAM


1 Besi beton polos kg
2 Besi beton ulir kg
3 Besi plat baja kg
4 Besi Profil kg
5 Besi pipa kg
6 Kawat ikat beton kg
7 Jendela nako psg
8 Pengelasan cm
9 Besi Setrip kg

VI BAHAN PENGECATAN
1 Cat meni kayu kg
2 Cat meni besi kg

VII BAHAN PENGGANTUNG DAN PENGUNCI


3 Engsel ex west, cavell, beleza setara bh
5 Kunci tanam biasa ex west, cavell, beleza setara bh
6 Kunci tanam kamar mandi bh
12 Grendel biasa bh
13 Grendel tanam bh
14 Handle/Pegangan pintu bh
IX BAHAN KACA
1 Kaca Polos Tebal 3 mm m²
2 Kaca Polos Tebal 5 mm m²

XII BAHAN PAKU


1 Paku Tripleks kg
2 Paku Biasa kg
3 Paku Sekrup dos
4 Paku Payung kg
5 Paku Gypsum kg
6 Paku Asbes kg
7 Paku Reng kg
8 Paku Usuk kg
9 Paku Kalsiboard kg
10 Paku Keling kg

XV POMPA
1 Pompa Tangan unit
2 Pompa Listrik : Panasonik
Kapasitas : L/dt unit
Kapasitas : L/dt unit
Jet pump unit
3 Mesin Pompa Air 5.5 PK (Honda) unit
4 Mesin Pompa Air 8.5 PK (Yanmar) unit
5 Mesin Pompa Air 8.5 PK (Kubota) unit
6 Mesin Tangki Sprayer unit

XVI PERALATAN/ALAT BANTU


4 Benang Rami rol
5 Cangkul (lengkap) bh
6 Cetok bh
8 Cikrak Bambu bh
9 Cikrak Seng bh
11 Ember bh
14 Garuk Kecil bh
15 Gedek Bambu Petung bh
18 Gergaji tangan bh
19 Gergaji Besi Sedang (Cainsow) unit
21 Gunting Tanaman bh
29 Gunting Pemotong Baja bh
31 Linggis bh
32 Meteran - 30 s/d 50 m bh
33 Palu Besar bh
34 Palu Kecil bh
35 Rambu Pengaman bh
36 Gerobag Artco stel

XX Sewa Alat
1 Sewa Theodolit hari
2 Sewa Waterpass hari
3 Sewa Scafolding + Accesories unit/hr
4 Sewa Pompa Air 5 KW hari
5 Sewa Pompa Air 10 KW hari
6 Sewa Pompa Air 20 KW hari

Keterangan :
KATEGORI A KATEGORI B
Kecamatan Ponorogo Kecamatan Ngrayun
Kecamatan Babadan Kecamatan Pudak
Kecamatan Jenangan Kecamatan Ngebel
Kecamatan Balong Kecamata: Jurug, Ngadirojo, Klepu, Bedoho
Kecamatan Jambon Kecamat : Dayakan
Kecamatan Jetis Kecamata: Tugurejo, Wates, Ngilo-Ilo, Caluk, Senep
Kecamatan Kauman Kecamat : Tumpuk, Tempuran, Temon, Sriti, Pangk
Kecamatan Mlarak Kecamata: Gajah, Jrakah
Kecamatan Pulung Kecamat : Pagerukir
Kecamatan Sambit Kecamata: Banaran, Bekiring, Wagir Kidul, Wayang
Kecamatan Sampung
Kecamatan Sawoo Catatan :
Kecamatan Siman 1. Nama- nama desa di kecamatan yang sama nam
Kecamatan Slahung tercantum dalam kategori B dimasukkan ke dalam
Kecamatan Sukorejo 2. Penentuan wilayah desa kategori A atau katego
berubah dengan mempertimbangan faktor kondis
Kecamatan Bungkal
dan teknis.
Kecamatan Sooko
Kecamatan Badegan
H BIDANG SARANA DAN PRASARANA FISIK
UN ANGGARAN 2017

HARGA A HARGA B
4 5

5,500.00 4,500.00
6,000.00 22,600.00
86,600.00 89,000.00
137,500.00 141,200.00
79,200.00 81,300.00
66,000.00 67,800.00
115,500.00 101,700.00
47800 48300

29,500.00 30,300.00

22,000,000.00 22,600,000.00
9,350,000.00 9,605,000.00
9,900,000.00 10,170,000.00
6,490,000.00 6,667,000.00
5,857,500.00 6,017,200.00

15,400,000.00 15,820,000.00
8,800,000.00 9,040,000.00
8,635,000.00 8,870,500.00
5,500,000.00 5,650,000.00
4,950,000.00 5,085,000.00

22,000,000.00 22,600,000.00
11,000,000.00 11,300,000.00
11,000,000.00 11,300,000.00
6,600,000.00 6,780,000.00
5,610,000.00 5,763,000.00

11,000,000.00 11,300,000.00
8,250,000.00 8,475,000.00
8,332,500.00 8,559,700.00
4,702,500.00 4,830,700.00
4,400,000.00 4,520,000.00
4,400,000.00 4,520,000.00
12,000.00 13,000.00
16,500.00 17,000.00
4,900.00 5,000.00
357,500.00 444,000.00
22,500.00 23,100.00

200,200.00 278,300.00
248,600.00 326,700.00
248,600.00 326,700.00
333,300.00 411,400.00
234,300.00 302,500.00
113,300.00 168,300.00
92,400.00 147,400.00
100,100.00 155,100.00
159,500.00 214,500.00
133,100.00 188,100.00
12,100.00 12,400.00
1,600.00 1,650.00
13,700.00 14,100.00
19,800.00 20,100.00
65.00 70.00

8,200.00 8,610.00
8,400.00 9,134.00
13,500.00 15,000.00
13,500.00 15,000.00
63,200.00 64,900.00
13,500.00 15,000.00
203,500.00 236,500.00
1,800.00 1,900.00
13,500.00 15,000.00

27,500.00 28,600.00
38,500.00 41,800.00

24,200.00 26,400.00
88,000.00 110,000.00
33,000.00 38,500.00
13,700.00 14,100.00
36,800.00 37,800.00
176,000.00 180,800.00
71,500.00 73,400.00
91,800.00 94,300.00

19,800.00 20,300.00
16,500.00 16,900.00
22,000.00 22,600.00
23,100.00 23,700.00
33,000.00 33,900.00
23,100.00 23,700.00
16,500.00 16,900.00
16,500.00 16,900.00
24,200.00 24,800.00
25,800.00 26,500.00

198,000.00 204,000.00

665,000.00 683,000.00
520,000.00 534,000.00
1,488,000.00 1,530,000.00
3,150,000.00 3,465,000.00
9,975,000.00 11,025,000.00
9,975,000.00 11,025,000.00
1,470,000.00 1,575,000.00

2,750.00 2,825.00
115,000.00 120,000.00
20,000.00 25,000.00
10,000.00 15,000.00
12,500.00 15,000.00
8,000.00 10,000.00
23,500.00 27,500.00
40,000.00 42,500.00
110,000.00 110,500.00
7,100,000.00 7,450,000.00
150,000.00 155,000.00
400,000.00 600,000.00
30,000.00 35,000.00
55,000.00 56,500.00
35,000.00 50,000.00
20,000.00 25,000.00
300,000.00 310,000.00
450,000.00 450,000.00

375,000.00 412,500.00
250,000.00 275,000.00
400.00 500.00
200,000.00 220,000.00
450,000.00 495,000.00
850,000.00 935,000.00

adirojo, Klepu, Bedoho

Wates, Ngilo-Ilo, Caluk, Senepo


Tempuran, Temon, Sriti, Pangkal, Tumpak Pelem

Bekiring, Wagir Kidul, Wayang, Karangpatihan

a di kecamatan yang sama namun tidak


tegori B dimasukkan ke dalam kategori A
h desa kategori A atau kategori B dapat
empertimbangan faktor kondisi lapangan, biaya
ANALISA HARGA SATUAN PEKERJAAN (ASHP) 201
HARGA SATUAN POKOK PEKERJAAN (HSPK
TAHUN ANGGARAN 2017

Harga Satuan
No Uraian Satuan Koefisien
Material

A B C D E
2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
2.2.1.1 Pembuatan 1 m' Pagar sementara dari seng gelombang tinggi 2 meter
A. Tenaga
Pekerja Oh 0.200
Tukang Kayu Oh 0.400
Kepala Tukang Oh 0.020
Mandor Oh 0.020
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 1.250 Rp 30,300.00
Semen Portland Kg 2.500 Rp 1,650.00
Seng gelombang 3" x 6" bjls 28 Lbr 1.200 Rp 89,000.00
Pasir beton m3 0.005 Rp 411,400.00
Batu pecah 2/3 m3 0.009 Rp 326,700.00
Kayu balok 5/7 Meranti m3 0.072 Rp 5,857,500.00
Paku Biasa Kg 0.060 Rp 16,900.00
Residu Ltr 0.450 Rp 20,100.00
C. Peralatan

2.2.1.2 Pengukuran dan pemasangan 1 m' Bouwplank


A. Tenaga
Pekerja Oh 0.100
Tukang Kayu Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.005
B. Bahan
Kayu balok 5/7 Meranti Btg 0.012 Rp 6,017,200.00
Paku Biasa Kg 0.020 Rp 16,900.00
Kayu papan 3/20 m' 0.007 Rp 13,000.00
C. Peralatan

2.2.1.3 Pembuatan 1 m2 kantor sementara dengan lantai plesteran


A. Tenaga
Pekerja Oh 2.000
Tukang Kayu Oh 2.000
Tukang Batu Oh 1.000
Kepala Tukang Oh 0.300
Mandor Oh 0.050
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 1.250 Rp 30,300.00
Kayu balok 5/7 m3 0.180 Rp 6,017,200.00
Paku Biasa Kg 0.080 Rp 16,900.00
Besi strip Kg 1.100 Rp 15,000.00
Semen Portland Kg 35.000 Rp 1,650.00
Pasir pasang m3 0.150 Rp 302,500.00
Pasir beton m3 0.100 Rp 411,400.00
Batu pecah 2/3 m3 0.150 Rp 326,700.00
Bata merah Bh 30.000 Rp 1,000.00
Seng Plat 3' x 6' BJLS 28 Lbr 0.250 Rp 48,300.00
Jendela nako Bh 0.200 Rp 203,500.00
Kaca Polos Tebal 5 mm m2 0.080 Rp 94,300.00
Kunci tanam biasa Bh 0.150 Rp 110,000.00
Plywood tebal 9 mm ukuran (120 x Lbr 0.060 Rp 141,200.00
C. Peralatan

2.2.1.4 Pembuatan 1 m2 rumah jaga (konstruksi kayu)


A. Tenaga
Pekerja Oh 1.000
Tukang Kayu Oh 1.500
Kepala Tukang Oh 0.150
Mandor Oh 0.050
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 3.000 Rp 30,300.00
Kayu balok 5/7 m3 0.276 Rp 6,017,200.00
Paku Biasa Kg 0.700 Rp 16,900.00
Seng gelombang 3" x 6" bjls 28 Kg 1.500 Rp 89,000.00
C. Peralatan

2.2.1.5 Pembuatan 1 m2 gudang semen dan Peralatan


A. Tenaga
Pekerja Oh 1.000
Tukang Kayu Oh 2.000
Kepala Tukang Oh 0.200
Mandor Oh 0.050
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 1.700 Rp 30,300.00
Kayu balok 5/7 m3 0.210 Rp 6,017,200.00
Paku Biasa Kg 0.300 Rp 16,900.00
Semen Portland Kg 10.500 Rp 1,650.00
Pasir beton m3 0.030 Rp 411,400.00
Batu pecah 2/3 m3 0.050 Rp 326,700.00
Seng gelombang 3" x 6" bjls 28 Lbr 1.500 Rp 89,000.00
Seng Plat 3' x 6' BJLS 28 Lbr 0.250 Rp 48,300.00
C. Peralatan

2.2.1.6 Pembuatan 1 m2 bedeng pekerja


A. Tenaga
Pekerja Oh 1.000
Tukang Kayu Oh 2.000
Kepala Tukang Oh 0.200
Mandor Oh 0.050
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 1.250 Rp 30,300.00
Kayu balok 5/7 m3 0.186 Rp 6,017,200.00
Paku Biasa Kg 0.300 Rp 16,900.00
Semen Portland Kg 18.000 Rp 1,650.00
Pasir beton m3 0.030 Rp 411,400.00
Batu pecah 2/3 m3 0.050 Rp 326,700.00
Seng gelombang 3" x 6" bjls 28 Lbr 1.500 Rp 89,000.00
Plywood tebal 9 mm ukuran (120 x Lbr 1.350 Rp 141,200.00
C. Peralatan

2.2.1.7 Pembersihan 1 m2 lapangan dan perataan


A. Tenaga
Pekerja Oh 0.100
Mandor Oh 0.050
B. Bahan Rp -
C. Peralatan

2.2.1.8 Pembuatan 1 m2 steger/perancah dari bambu


A. Tenaga
Pekerja OH 1.000
Tukang Kayu OH 2.000
Kepala Tukang OH 0.200
Mandor OH 0.050
B. Bahan
Bambu Ø 6 - 8 /600 cm Btg 1.250 Rp 16,500.00
Tali Ijuk m3 0.186 Rp 22,000.00
C. Peralatan

2.3.1 HARGA SATUAN PEKERJAAN TANAH


2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
A. Tenaga
Pekerja OH 0.750
Mandor OH 0.025
B. Bahan Rp -
C. Peralatan

2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 3 m


A. Tenaga
Pekerja OH 1.050
Mandor OH 0.067
B. Bahan Rp -
C. Peralatan

2.3.1.2 Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
A. Tenaga
Pekerja OH 0.500
Mandor OH 0.050
B. Bahan Rp -
C. Peralatan

2.3.1.3 Pengurugan 1 m3 dengan pasir urug


A. Tenaga
Pekerja OH 0.300
Mandor OH 0.010
B. Bahan
Pasir urug m3 1.200 Rp 168,300.00
C. Peralatan

2.3.1.13 Pengurugan 1 m3 sirtu padat


A. Tenaga
Pekerja OH 0.250
Mandor OH 0.025
B. Bahan
Sirtu m3 1.200 Rp 155,100.00
C. Peralatan

3.2.1 HARGA SATUAN PEKERJAAN PONDASI


3.2.1.1 Pemasangan 1 m3 pondasi batu belah campuran 1PC : 3PP
A. Tenaga
Pekerja OH 1.500
Tukang Batu OH 0.750
Kepala Tukang OH 0.075
Mandor OH 0.075
B. Bahan
Batu belah 15/20 m3 1.200 Rp 278,300.00
Semen Portland kg 202.000 Rp 1,650.00
Pasir pasang m3 0.485 Rp 302,500.00
C. Peralatan

3.2.1.2 Pemasangan 1 m3 batu kosong (anstamping)


A. Tenaga
Pekerja OH 0.780
Tukang Batu OH 0.390
Kepala Tukang OH 0.039
Mandor OH 0.039
B. Bahan
Batu belah 15/20 m3 1.200 Rp 278,300.00
Pasir urug m3 0.432 Rp 168,300.00
C. Peralatan

4.1.1 HARGA SATUAN PEKERJAAN BETON


4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f', = 7,4 MPa (K 100), slump (3-6) cm, w/c
A. Tenaga
Pekerja OH 1.200
Tukang Batu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.060
B. Bahan
Semen Portland Kg 230.000 Rp 1,650.00
Pasir Beton m3 0.638 Rp 411,400.00
Batu pecah 3/5 m3 0.761 Rp 326,700.00
Air Ltr 200.000 Rp 70.00
C. Peralatan

4.1.1.1 Membuat 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 ± 2) cm, w/o = 0,53
A. Tenaga
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083
B. Bahan
Semen Portland Kg 406.000 Rp 1,650.00
Pasir Beton m3 0.489 Rp 411,400.00
Batu pecah 3/5 m3 0.760 Rp 326,700.00
Air Ltr 215.000 Rp 70.00
C. Peralatan

4.1.1.2 Pembesian 10 kg dengan besi Ulir


A. Tenaga
Pekerja OH 0.070
Tukang Besi OH 0.070
Kepala Tukang OH 0.007
Mandor OH 0.004
B. Bahan
Besi beton Ulir Kg 10.500 Rp 9,134.00
Kawat ikat beton Kg 0.150 Rp 15,000.00
C. Peralatan

4.1.1.3 Pembesian 10 kg dengan besi polos


A. Tenaga
Pekerja OH 0.070
Tukang Besi OH 0.070
Kepala Tukang OH 0.007
Mandor OH 0.004
B. Bahan
Besi beton polos Kg 10.500 Rp 8,610.00
Kawat ikat beton Kg 0.150 Rp 15,000.00
C. Peralatan

4.1.1.4 Pemasangan 1 m2 bekisting untuk pondasi


A. Tenaga
Pekerja OH 0.520
Tukang Besi OH 0.260
Kepala Tukang OH 0.026
Mandor OH 0.026
B. Bahan
Kayu Begesting m3 0.040 Rp 5,763,000.00
Paku Biasa Kg 0.300 Rp 16,900.00
Minyak bekisting Ltr 0.100 Rp 5,000.00
C. Peralatan

4.1.1.5 Pemasangan 1 m2 bekisting untuk sloof


A. Tenaga
Pekerja OH 0.520
Tukang Kayu OH 0.260
Kepala Tukang OH 0.026
Mandor OH 0.026
B. Bahan
Kayu Begesting Meranti m3 0.045 Rp 5,763,000.00
Paku Biasa Kg 0.300 Rp 16,900.00
Minyak bekisting Ltr 0.100 Rp 5,000.00
C. Peralatan

4.1.1.6 Pemasangan 1 m2 bekisting untuk kolom


A. Tenaga
Pekerja OH 0.660
Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033
B. Bahan
Kayu Begesting m3 0.040 Rp 5,763,000.00
Paku Biasa Kg 0.400 Rp 16,900.00
Minyak bekisting Ltr 0.200 Rp 5,000.00
Kelas II (kayu kalimantan/borneo) b m3 0.015 Rp 9,605,000.00
Plywood tebal 9 mm (120 x 240) Lbr 0.350 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 2.000 Rp 30,300.00
C. Peralatan

4.1.1.7 Pemasangan 1 m2 bekisting untuk balok


A. Tenaga
Pekerja OH 0.660
Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033
B. Bahan
Kayu Begesting m3 0.040 Rp 5,763,000.00
Paku Biasa Kg 0.400 Rp 16,900.00
Minyak bekisting Ltr 0.200 Rp 5,000.00
Kelas II (kayu kalimantan/borneo) b m3 0.018 Rp 9,605,000.00
Plywood tebal 9 mm (120 x 240) Lbr 0.350 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 2.000 Rp 30,300.00
C. Peralatan

4.1.1.8 Pemasangan 1 m2 bekisting untuk lantai


A. Tenaga
Pekerja OH 0.660
Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033
B. Bahan
Kayu Begesting m3 0.040 Rp 5,763,000.00
Paku Biasa Kg 0.400 Rp 16,900.00
Minyak bekisting Ltr 0.200 Rp 5,000.00
Kelas II (kayu kalimantan/borneo) b m3 0.015 Rp 9,605,000.00
Plywood tebal 9 mm (120 x 240) Lbr 0.350 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 6.000 Rp 30,300.00
C. Peralatan

4.1.1.9 Pemasangan 1 m2 bekisting untuk tangga


A. Tenaga
Pekerja OH 0.660
Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033
B. Bahan
Kayu Begesting m3 0.030 Rp 5,763,000.00
Paku Biasa Kg 0.400 Rp 16,900.00
Minyak bekisting Ltr 0.150 Rp 5,000.00
Kelas II (kayu kalimantan/borneo) b m3 0.015 Rp 9,605,000.00
Plywood tebal 9 mm (120 x 240) Lbr 0.350 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 2.000 Rp 30,300.00
C. Peralatan

4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f', = 7,4 MPa (K 100), slump (3-6) cm, w/c
A. Tenaga
Pekerja OH 1.200
Tukang Batu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.060
B. Bahan
Semen Portland Kg 230.000 Rp 1,650.00
Pasir Beton m3 0.638 Rp 411,400.00
Batu pecah 3/5 m3 0.761 Rp 326,700.00
Air Ltr 200.000 Rp 70.00
C. Peralatan

4.1.1.27 Pembuatan 1 m3 pondasi beton bertulang (150 kg besi + bekisting) f’c 25


A. Tenaga
Pekerja OH 5.300
Tukang batu OH 0.275
Tukang kayu OH 1.300
Tukang besi OH 1.050
Kepala Tukang OH 0.262
Mandor OH 0.265
B. Bahan
Kayu Begesting m3 0.200 Rp 5,763,000.00
Paku Biasa Kg 1.500 Rp 16,900.00
Minyak bekisting Ltr 0.400 Rp 5,000.00
Besi beton polos Kg 157.500 Rp 8,610.00
Kawat ikat beton Kg 2.250 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
C. Peralatan

4.1.1.28 Pembuatan 1 m3 sloof beton bertulang (200 kg besi + bekisting) f’c 25


A. Tenaga
Pekerja OH 5.650
Tukang batu OH 0.275
Tukang kayu OH 1.560
Tukang besi OH 1.400
Kepala Tukang OH 0.323
Mandor OH 0.283
B. Bahan
Kayu Begesting m3 0.270 Rp 5,763,000.00
Paku Biasa Kg 2.000 Rp 16,900.00
Minyak bekisting Ltr 0.600 Rp 5,000.00
Besi beton polos Kg 210.000 Rp 8,610.00
Kawat ikat beton Kg 3.000 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
C. Peralatan

4.1.1.29 Pembuatan 1 m3 kolom beton bertulang (300 kg besi + bekisting) f’c 25


A. Tenaga
Pekerja OH 7.050
Tukang batu OH 0.275
Tukang kayu OH 1.650
Tukang besi OH 2.100
Kepala Tukang OH 0.403
Mandor OH 0.353
B. Bahan
Kayu Begesting m3 0.400 Rp 5,763,000.00
Paku Biasa Kg 4.000 Rp 16,900.00
Minyak bekisting Ltr 2.000 Rp 5,000.00
Besi beton polos Kg 315.000 Rp 8,610.00
Kawat ikat beton Kg 4.500 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
Kelas II (kayu kalimantan/borneo) b m3 0.150 Rp 9,605,000.00
Plywood tebal 9 mm (120 x 240) Lbr 3.500 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 20.000 Rp 30,300.00
C. Peralatan
4.1.1.30 Pembuatan 1 m3 balok beton bertulang (200 kg besi + bekisting) f’c 25
A. Tenaga
Pekerja OH 6.350
Tukang batu OH 0.275
Tukang kayu OH 1.650
Tukang besi OH 1.400
Kepala Tukang OH 0.333
Mandor OH 0.318
B. Bahan
Kayu Begesting m3 0.320 Rp 5,763,000.00
Paku Biasa Kg 3.200 Rp 16,900.00
Minyak bekisting Ltr 1.600 Rp 5,000.00
Besi beton polos Kg 210.000 Rp 8,610.00
Kawat ikat beton Kg 3.000 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
Kelas II (kayu kalimantan/borneo) b m3 0.140 Rp 9,605,000.00
Plywood tebal 9 mm (120 x 240) Lbr 2.800 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 16.000 Rp 30,300.00
C. Peralatan

4.1.1.31 Pembuatan 1 m3 plat beton bertulang (150 kg besi + bekisting) f’c 25


A. Tenaga
Pekerja OH 5.300
Tukang batu OH 0.275
Tukang kayu OH 1.300
Tukang besi OH 1.050
Kepala Tukang OH 0.265
Mandor OH 0.265
B. Bahan
Kayu Begesting m3 0.320 Rp 5,763,000.00
Paku Biasa Kg 3.200 Rp 16,900.00
Minyak bekisting Ltr 1.600 Rp 5,000.00
Besi beton polos Kg 157.500 Rp 8,610.00
Kawat ikat beton Kg 2.250 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
Kelas II (kayu kalimantan/borneo) b m3 0.120 Rp 9,605,000.00
Plywood tebal 9 mm (120 x 240) Lbr 2.800 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 32.000 Rp 30,300.00
C. Peralatan
4.1.1.34 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) f’c 25
A. Tenaga
Pekerja OH 5.650
Tukang batu OH 0.275
Tukang kayu OH 1.560
Tukang besi OH 1.400
Kepala Tukang OH 0.323
Mandor OH 0.283
B. Bahan
Kayu Begesting m3 0.250 Rp 5,763,000.00
Paku Biasa Kg 3.000 Rp 16,900.00
Minya Bekisting Lt 1.200 Rp 5,000.00
Besi beton polos Kg 210.000 Rp 8,610.00
Kawat ikat beton Kg 3.000 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
Kelas II (kayu kalimantan/borneo) b m3 0.105 Rp 9,605,000.00
Plywood tebal 9 mm (120 x 240) Lbr 2.500 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 14.000 Rp 30,300.00
C. Peralatan

4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


4.2.1.1 Pemasangan 1 kg besi profil
A. Tenaga
Pekerja OH 0.060
Tukang Las Konstruksi OH 0.060
Kepala Tukang OH 0.006
Mandor OH 0.003
B. Bahan
Besi Profil Kg 1.150 Rp 15,000.00
C. Peralatan

4.2.1.2 Pengerjaan 100 kg pekerjaan perakitan


A. Tenaga
Pekerja OH 0.100
Tukang Besi Konstruksi OH 0.100
Kepala Tukang OH 0.001
Mandor OH 0.005
B. Bahan
Solar Ltr 1.000 Rp 6,500.00
Minyak pelumas Ltr 0.100 Rp 40,000.00
C. Peralatan
Sewa Alat Jam 0.800
4.2.1.3 Pengerjaan 10 cm pengelasan dengan las listrik
A. Tenaga
Pekerja OH 0.040
Tukang Las Konstruksi OH 0.020
Kepala Tukang OH 0.002
Mandor OH 0.002
B. Bahan
Kawat las Kg 0.400 Rp 26,400.00
Solar Ltr 0.300 Rp 6,500.00
Minyak pelumas Ltr 0.040 Rp 40,000.00
C. Peralatan
Sewa Alat Jam 0.170

4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


4.5.2.1 Pemasangan 1 m2 atap genteng kodok glazur
A. Tenaga
Pekerja OH 0.150
Tukang Kayu OH 0.075
Kepala Tukang OH 0.008
Mandor OH 0.008
B. Bahan
Genteng Kodok Glazur Bh 25.000 Rp 5,500.00
C. Peralatan

4.5.2.2 Pemasangan 1 m' bubung genteng kodok glazur


A. Tenaga
Pekerja OH 0.400
Tukang Kayu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.002
B. Bahan
Genteng bubung kodok Bh 5.000 Rp 22,600.00
Semen Portland Kg 8.000 Rp 1,650.00
Pasir Pasang m3 0.032 Rp 302,500.00
C. Peralatan

4.6.1.12 Pemasangan 1 m2 rangka atap genteng kayu kelas II


A. Tenaga
Pekerja OH 0.100
Tukang Kayu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005
B. Bahan
Kelas II (kayu kamper) kaso m3 0.014 Rp 8,870,500.00
Kelas II (kayu kamper) reng m3 0.036 Rp 8,559,700.00
Paku Biasa Kg 0.250 Rp 16,900.00
C. Peralatan

4.6.1.18 Pemasangan 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau II
A. Tenaga
Pekerja OH 0.100
Tukang Kayu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.005
B. Bahan
Papan Kayu m3 0.011 ###
Paku Biasa Kg 0.050 Rp 16,900.00
C. Peralatan
AAN (ASHP) 2017BIDANG CIPTA KARYA
KERJAAN (HSPK) KAB. PONOROGO
NGGARAN 2017

Harga Jumlah Material Jumlah Upah Total Harga


Satuan
Upah
( Rp ) ( Rp ) ( Rp )
F H=(DxE) I=(DxF) K

ggi 2 meter Rp 585,596.30 Rp 46,300.00 Rp 631,896.30

Rp 65,000.00 Rp 13,000.00
Rp 75,000.00 Rp 30,000.00
Rp 80,000.00 Rp 1,600.00
Rp 85,000.00 Rp 1,700.00

Rp 37,875.00
Rp 4,125.00
Rp 106,800.00
Rp 2,057.00
Rp 2,940.30
Rp 421,740.00
Rp 1,014.00
Rp 9,045.00

Rp 72,635.40 Rp 15,225.00 Rp 87,860.40

Rp 65,000.00 Rp 6,500.00
Rp 75,000.00 Rp 7,500.00
Rp 80,000.00 Rp 800.00
Rp 85,000.00 Rp 425.00

Rp 72,206.40
Rp 338.00
Rp 91.00

Rp 1,447,384.00 Rp 383,250.00 Rp 1,830,634.00


Rp 65,000.00 Rp 130,000.00
Rp 75,000.00 Rp 150,000.00
Rp 75,000.00 Rp 75,000.00
Rp 80,000.00 Rp 24,000.00
Rp 85,000.00 Rp 4,250.00

Rp 37,875.00
Rp 1,083,096.00
Rp 1,352.00
Rp 16,500.00
Rp 57,750.00
Rp 45,375.00
Rp 41,140.00
Rp 49,005.00
Rp 30,000.00
Rp 12,075.00
Rp 40,700.00
Rp 7,544.00
Rp 16,500.00
Rp 8,472.00

Rp 1,896,977.20 Rp 193,750.00 Rp 2,090,727.20

Rp 65,000.00 Rp 65,000.00
Rp 75,000.00 Rp 112,500.00
Rp 80,000.00 Rp 12,000.00
Rp 85,000.00 Rp 4,250.00

Rp 90,900.00
Rp 1,660,747.20
Rp 11,830.00
Rp 133,500.00

Rp 1,511,769.00 Rp 235,250.00 Rp 1,747,019.00

Rp 65,000.00 Rp 65,000.00
Rp 75,000.00 Rp 150,000.00
Rp 80,000.00 Rp 16,000.00
Rp 85,000.00 Rp 4,250.00

Rp 51,510.00
Rp 1,263,612.00
Rp 5,070.00
Rp 17,325.00
Rp 12,342.00
Rp 16,335.00
Rp 133,500.00
Rp 12,075.00

Rp 1,544,641.20 Rp 235,250.00 Rp 1,779,891.20

Rp 65,000.00 Rp 65,000.00
Rp 75,000.00 Rp 150,000.00
Rp 80,000.00 Rp 16,000.00
Rp 85,000.00 Rp 4,250.00

Rp 37,875.00
Rp 1,119,199.20
Rp 5,070.00
Rp 29,700.00
Rp 12,342.00
Rp 16,335.00
Rp 133,500.00
Rp 190,620.00

Rp - Rp 10,750.00 Rp 10,750.00

Rp 65,000.00 Rp 6,500.00
Rp 85,000.00 Rp 4,250.00
Rp -

Rp 24,717.00 Rp 235,250.00 Rp 259,967.00

Rp 65,000.00 Rp 65,000.00
Rp 75,000.00 Rp 150,000.00
Rp 80,000.00 Rp 16,000.00
Rp 85,000.00 Rp 4,250.00

Rp 20,625.00
Rp 4,092.00
Rp - Rp 50,875.00 Rp 50,875.00

Rp 65,000.00 Rp 48,750.00
Rp 85,000.00 Rp 2,125.00
Rp -

Rp - Rp 73,945.00 Rp 73,945.00

Rp 65,000.00 Rp 68,250.00
Rp 85,000.00 Rp 5,695.00
Rp -

Rp - Rp 36,750.00 Rp 36,750.00
en pekerjaan galian

Rp 65,000.00 Rp 32,500.00
Rp 85,000.00 Rp 4,250.00
Rp -

Rp 201,960.00 Rp 20,350.00 Rp 222,310.00

Rp 65,000.00 Rp 19,500.00
Rp 85,000.00 Rp 850.00

Rp 201,960.00

Rp 186,120.00 Rp 18,375.00 Rp 204,495.00

Rp 65,000.00 Rp 16,250.00
Rp 85,000.00 Rp 2,125.00

Rp 186,120.00

Rp 813,972.50 Rp 166,125.00 Rp 980,097.50

Rp 65,000.00 Rp 97,500.00
Rp 75,000.00 Rp 56,250.00
Rp 80,000.00 Rp 6,000.00
Rp 85,000.00 Rp 6,375.00

Rp 333,960.00
Rp 333,300.00
Rp 146,712.50

Rp 406,665.60 Rp 86,385.00 Rp 493,050.60

Rp 65,000.00 Rp 50,700.00
Rp 75,000.00 Rp 29,250.00
Rp 80,000.00 Rp 3,120.00
Rp 85,000.00 Rp 3,315.00

Rp 333,960.00
Rp 72,705.60

0), slump (3-6) cm, w/c Rp 904,448.43 Rp 99,700.00 Rp 1,004,148.43

Rp 65,000.00 Rp 78,000.00
Rp 75,000.00 Rp 15,000.00
Rp 80,000.00 Rp 1,600.00
Rp 85,000.00 Rp 5,100.00

Rp 379,500.00
Rp 262,414.43
Rp 248,534.00
Rp 14,000.00

12 ± 2) cm, w/o = 0,53 Rp 1,134,240.29 Rp 137,170.00 Rp 1,271,410.29

Rp 65,000.00 Rp 107,250.00
Rp 75,000.00 Rp 20,625.00
Rp 80,000.00 Rp 2,240.00
Rp 85,000.00 Rp 7,055.00

Rp 669,900.00
Rp 200,998.29
Rp 248,292.00
Rp 15,050.00
Rp 98,157.00 Rp 10,700.00 Rp 108,857.00

Rp 65,000.00 Rp 4,550.00
Rp 75,000.00 Rp 5,250.00
Rp 80,000.00 Rp 560.00
Rp 85,000.00 Rp 340.00

Rp 95,907.00
Rp 2,250.00

Rp 92,655.00 Rp 10,700.00 Rp 103,355.00

Rp 65,000.00 Rp 4,550.00
Rp 75,000.00 Rp 5,250.00
Rp 80,000.00 Rp 560.00
Rp 85,000.00 Rp 340.00

Rp 90,405.00
Rp 2,250.00

Rp 236,090.00 Rp 57,590.00 Rp 293,680.00

Rp 65,000.00 Rp 33,800.00
Rp 75,000.00 Rp 19,500.00
Rp 80,000.00 Rp 2,080.00
Rp 85,000.00 Rp 2,210.00

Rp 230,520.00
Rp 5,070.00
Rp 500.00

Rp 264,905.00 Rp 57,590.00 Rp 322,495.00

Rp 65,000.00 Rp 33,800.00
Rp 75,000.00 Rp 19,500.00
Rp 80,000.00 Rp 2,080.00
Rp 85,000.00 Rp 2,210.00

Rp 259,335.00
Rp 5,070.00
Rp 500.00

Rp 492,375.00 Rp 73,095.00 Rp 565,470.00

Rp 65,000.00 Rp 42,900.00
Rp 75,000.00 Rp 24,750.00
Rp 80,000.00 Rp 2,640.00
Rp 85,000.00 Rp 2,805.00

Rp 230,520.00
Rp 6,760.00
Rp 1,000.00
Rp 144,075.00
Rp 49,420.00
Rp 60,600.00

Rp 521,190.00 Rp 73,095.00 Rp 594,285.00

Rp 65,000.00 Rp 42,900.00
Rp 75,000.00 Rp 24,750.00
Rp 80,000.00 Rp 2,640.00
Rp 85,000.00 Rp 2,805.00

Rp 230,520.00
Rp 6,760.00
Rp 1,000.00
Rp 172,890.00
Rp 49,420.00
Rp 60,600.00

Rp 613,575.00 Rp 73,095.00 Rp 686,670.00

Rp 65,000.00 Rp 42,900.00
Rp 75,000.00 Rp 24,750.00
Rp 80,000.00 Rp 2,640.00
Rp 85,000.00 Rp 2,805.00

Rp 230,520.00
Rp 6,760.00
Rp 1,000.00
Rp 144,075.00
Rp 49,420.00
Rp 181,800.00

Rp 434,495.00 Rp 73,095.00 Rp 507,590.00

Rp 65,000.00 Rp 42,900.00
Rp 75,000.00 Rp 24,750.00
Rp 80,000.00 Rp 2,640.00
Rp 85,000.00 Rp 2,805.00

Rp 172,890.00
Rp 6,760.00
Rp 750.00
Rp 144,075.00
Rp 49,420.00
Rp 60,600.00

0), slump (3-6) cm, w/c Rp 904,448.43 Rp 99,700.00 Rp 1,004,148.43

Rp 65,000.00 Rp 78,000.00
Rp 75,000.00 Rp 15,000.00
Rp 80,000.00 Rp 1,600.00
Rp 85,000.00 Rp 5,100.00

Rp 379,500.00
Rp 262,414.43
Rp 248,534.00
Rp 14,000.00

ekisting) f’c 25 Rp 3,610,958.00 Rp 584,860.00 Rp 4,195,818.00

Rp 65,000.00 Rp 344,500.00
Rp 75,000.00 Rp 20,625.00
Rp 75,000.00 Rp 97,500.00
Rp 75,000.00 Rp 78,750.00
Rp 80,000.00 Rp 20,960.00
Rp 85,000.00 Rp 22,525.00

Rp 1,152,600.00
Rp 25,350.00
Rp 2,000.00
Rp 1,356,075.00
Rp 33,750.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00

sting) f’c 25 Rp 4,487,093.00 Rp 659,770.00 Rp 5,146,863.00

Rp 65,000.00 Rp 367,250.00
Rp 75,000.00 Rp 20,625.00
Rp 75,000.00 Rp 117,000.00
Rp 75,000.00 Rp 105,000.00
Rp 80,000.00 Rp 25,840.00
Rp 85,000.00 Rp 24,055.00

Rp 1,556,010.00
Rp 33,800.00
Rp 3,000.00
Rp 1,808,100.00
Rp 45,000.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00

kisting) f’c 25 Rp 8,744,583.00 Rp 822,370.00 Rp 9,566,953.00

Rp 65,000.00 Rp 458,250.00
Rp 75,000.00 Rp 20,625.00
Rp 75,000.00 Rp 123,750.00
Rp 75,000.00 Rp 157,500.00
Rp 80,000.00 Rp 32,240.00
Rp 85,000.00 Rp 30,005.00

Rp 2,305,200.00
Rp 67,600.00
Rp 10,000.00
Rp 2,712,150.00
Rp 67,500.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00
Rp 1,440,750.00
Rp 494,200.00
Rp 606,000.00
isting) f’c 25 Rp 7,025,383.00 Rp 715,795.00 Rp 7,741,178.00

Rp 65,000.00 Rp 412,750.00
Rp 75,000.00 Rp 20,625.00
Rp 75,000.00 Rp 123,750.00
Rp 75,000.00 Rp 105,000.00
Rp 80,000.00 Rp 26,640.00
Rp 85,000.00 Rp 27,030.00

Rp 1,844,160.00
Rp 54,080.00
Rp 8,000.00
Rp 1,808,100.00
Rp 45,000.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00
Rp 1,344,700.00
Rp 395,360.00
Rp 484,800.00

ting) f’c 25 Rp 6,854,808.00 Rp 585,100.00 Rp 7,439,908.00

Rp 65,000.00 Rp 344,500.00
Rp 75,000.00 Rp 20,625.00
Rp 75,000.00 Rp 97,500.00
Rp 75,000.00 Rp 78,750.00
Rp 80,000.00 Rp 21,200.00
Rp 85,000.00 Rp 22,525.00

Rp 1,844,160.00
Rp 54,080.00
Rp 8,000.00
Rp 1,356,075.00
Rp 33,750.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00
Rp 1,152,600.00
Rp 395,360.00
Rp 969,600.00
g) f’c 25 Rp 6,177,458.00 Rp 659,770.00 Rp 6,837,228.00

Rp 65,000.00 Rp 367,250.00
Rp 75,000.00 Rp 20,625.00
Rp 75,000.00 Rp 117,000.00
Rp 75,000.00 Rp 105,000.00
Rp 80,000.00 Rp 25,840.00
Rp 85,000.00 Rp 24,055.00

Rp 1,440,750.00
Rp 50,700.00
Rp 6,000.00
Rp 1,808,100.00
Rp 45,000.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00
Rp 1,008,525.00
Rp 353,000.00
Rp 424,200.00

LUMUNIUM
Rp 17,250.00 Rp 9,135.00 Rp 26,385.00

Rp 65,000.00 Rp 3,900.00
Rp 75,000.00 Rp 4,500.00
Rp 80,000.00 Rp 480.00
Rp 85,000.00 Rp 255.00

Rp 17,250.00

Rp 10,500.00 Rp 14,505.00 Rp 25,005.00

Rp 65,000.00 Rp 6,500.00
Rp 75,000.00 Rp 7,500.00
Rp 80,000.00 Rp 80.00
Rp 85,000.00 Rp 425.00

Rp 6,500.00
Rp 4,000.00
Rp 14,110.00 Rp 4,430.00 Rp 18,540.00

Rp 65,000.00 Rp 2,600.00
Rp 75,000.00 Rp 1,500.00
Rp 80,000.00 Rp 160.00
Rp 85,000.00 Rp 170.00

Rp 10,560.00
Rp 1,950.00
Rp 1,600.00

Rp 137,500.00 Rp 16,695.00 Rp 154,195.00

Rp 65,000.00 Rp 9,750.00
Rp 75,000.00 Rp 5,625.00
Rp 80,000.00 Rp 640.00
Rp 85,000.00 Rp 680.00

Rp 137,500.00

Rp 135,880.00 Rp 42,770.00 Rp 178,650.00

Rp 65,000.00 Rp 26,000.00
Rp 75,000.00 Rp 15,000.00
Rp 80,000.00 Rp 1,600.00
Rp 85,000.00 Rp 170.00

Rp 113,000.00
Rp 13,200.00
Rp 9,680.00

Rp 436,561.20 Rp 15,225.00 Rp 451,786.20

Rp 65,000.00 Rp 6,500.00
Rp 75,000.00 Rp 7,500.00
Rp 80,000.00 Rp 800.00
Rp 85,000.00 Rp 425.00
Rp 124,187.00
Rp 308,149.20
Rp 4,225.00

Rp 249,445.00 Rp 23,525.00 Rp 272,970.00

Rp 65,000.00 Rp 6,500.00
Rp 75,000.00 Rp 15,000.00
Rp 80,000.00 Rp 1,600.00
Rp 85,000.00 Rp 425.00

Rp 248,600.00
Rp 845.00
30 A.4.1.1.34 1 m3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
A Tenaga
L.01 5.65 OH Pekerja 55,000.00
L.02 0.275 OH Tukang batu 75,000.00
L.02 1.56 OH Tukang Kayu 75,000.00
L.02 1.4 OH Tukang Besi 75,000.00
L.03 0.323 OH Kepala Tukang 80,000.00
L.04 0.283 OH Mandor 70,000.00
B Bahan
0.25 m3 Kayu Klas III (Terentang) 1,750,000.00
3 Kg Paku Biasa 2" - 5" 12,000.00

1.2 Ltr Minyak Bekisting 9,000.00


210 Kg Besi Beton Polos 9,500.00
3 Kg Kawat Beton 15,000.00
336 Kg Portland Semen 1,375.00
0.54 m3 Pasir Beton 250,000.00
0.81 m3 Kerikil Beton 250,000.00
0.105 m3 Kayu Klas II Balok 5,000,000.00
2.5 Lbr Plywood 9 mm 110,000.00
14 Btg Dolken diameter 8 / 4rm 34,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
200 kg Besi + Bekisting) f’c 25 ### ###
### ###
60,000.00 ### ###
85,000.00 ### ###
85,000.00 ### ###
85,000.00 ### ###
85,000.00 ### ###
75,000.00 ### ###
### ###
1,900,000.00 ### ###
17,000.00 ### ###

10,000.00 ### ###


10,700.00 ### ###
16,000.00 ### ###
1,425.00 ### ###
280,000.00 ### ###
295,000.00 ### ###
5,800,000.00 ### ###
135,000.00 ### ###
36,000.00 ### ###

### ###
### ###
### ###
DAFTAR REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN (AHSP) BIDANG
KAB. PONOROGO

Kode
JENIS PEKERJAAN
SNI
2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
Pembuatan 1 m2 Pagar sementara dari seng gelombang tinggi 2 meter
Pengukuran dan pemasangan 1 m' Bouwplank
Pembuatan 1 m2 kantor sementara dengan lantai plesteran
Pembuatan 1 m2 rumah jaga (konstruksi kayu) dan kamar mandi
Pembuatan 1 m2 gudang semen dan Peralatan
Pembuatan 1 m2 bedeng pekerja
Pembersihan 1 m2 lapanga
Pembuatan 1 m2 steger/perancah dari bambu

2.3.1 HARGA SATUAN PEKERJAAN TANAH


Penggalian 1 m3 tanah biasa sedalam 2 m
Penggalian 1 m3 tanah biasa sedalam 3 m
Pengurugan kembali 1 m3 galian tanah
Pengurugan 1 m3 dengan pasir urug
Pengurugan 1 m3 sirtu padat

3.2.1 HARGA SATUAN PEKERJAAN PONDASI


Pemasangan 1 m3 pondasi batu belah campuran 1PC : 3PP
Pemasangan 1 m3 batu kosong (anstamping)

4.1.1 HARGA SATUAN PEKERJAAN BETON


Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Membuat 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 ± 2) cm, w/o = 0,53
Pembesian 10 kg dengan besi polos atau besi ulir
Pembuatan 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Pembuatan 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Pembuatan 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Pembuatan 1 m3 balok beton bertulang (200 kg besi + bekisting)
Pembuatan 1 m3 balok beton bertulang (150 kg besi + bekisting)
Pembuatan 1 m3 plat beton bertulang (150 kg besi + bekisting)
Pembuatan 1 m3 tangga (200 kg besi + bekisting)
Pemasangan 1 m2 bekisting untuk pondasi
Pemasangan 1 m2 bekisting untuk sloof
Pemasangan 1 m2 bekisting untuk kolom
Pemasangan 1 m2 bekisting untuk balok
Pemasangan 1 m2 bekisting untuk lantai
Pemasangan 1 m2 bekisting untuk tangga

4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


Pemasangan 1 kg besi profil
Pengerjaan 100 kg pekerjaan perakitan
Total biaya bahan+pengerjaan besi profil
ASI
SP) BIDANG CIPTA KARYA PERHATIAN !!!
O
AGAR SELALU

SAT
AHSP CEK ANALISA
A B
(PENYUSUN MUNGKIN ADA KEKELIRUAN
DALAM MEMASUKKAN HARGA)
m2 631,896.30
SESUAIKAN HARGA DENGAN MATERIAL
m' 87,860.40
YANG DIPERGUNAKAN..
m2 1,830,634.00
m2 2,090,727.20
m2 1,747,019.00
m2 1,779,891.20
m2 10,750.00
m2 259,967.00

m3 50,875.00
m3 73,945.00
m3 36,750.00
m3 222,310.00
m3 204,495.00

m3 980,097.50
m3 493,050.60

m3 1,004,148.43
m3 1,271,410.29
kg 108,857.00
m3 4,195,818.00
m3 5,146,863.00
m3 9,566,953.00
m3 7,741,178.00
m3 7,289,153.00
m3 7,439,908.00
m3 6,837,228.00
m2 293,680.00
m2 322,495.00
m2 565,470.00
m2 594,285.00
m2 686,670.00
m2 507,590.00

kg 26,385.00
100 kg 25005.000
51,390.00
AN !!!

ADA KEKELIRUAN
HARGA)
NGAN MATERIAL
CALCULATION SHEET
PERENCANAAN STRUKTUR GEDUNG FAKULTAS TARBIYAH STAIN PONOROGO
KEMENTRIAN AGAMA PROVINSI JAWA TIMUR
KAB PONOROGO - JAWA TIMUR

No Gambar Hitungan volume satuan


I Pekerjaan Persiapan
1 Pembersihan Lahan 2800 m²
Luas =70 x 40 = 2800 m2

2 Pembuatan Pagar Proyek 220.00 m


Keliling lapangan = 2 x (40 + 70) = 220 m

3 Pembuatan Direksi Keet 28.00 m²

Luas =(4 x 7)= 28m2


4

4 Pembuatan barak kerja 36.50 m²


Luas= (4 x 8)+(1,5x3) = 36,50 m²
4

1,5

8 3

5 Pembuatan Gudang 32.00 m²


Luas= 4 x 8 = 32 m²
4

6 Pembuatan Pos Jaga 4.00 m²


Luas= 2 x 2 = 4 m²
2

2
7 Pekerjaan Bowplank bowplank sebanyak = 32 buah 48.00 m'
usuk 5/7 sebanyak =32 x 2 = 64 buah

Papan bowplank 2/20 = 32 x 1,5 m = 48 m

usuk 5/7 = 64 x 1 = 64 m
volum usuk = 0,05 x 0,07 x 64 =0,224 m3

8 Papan Nama Proyek 1 1 ls


9 Penerangan Kerja Harian 1 1 ls
10 Pengadaan Air kerja 1 1 ls

II Pekerjaan Tanah
1 Galian Footplat 248.4 m³
jumlah footplat = 46 buah
volume = 1,5 X 1,5 X 2,4 = 5,4 m³
total galian footplat = 5,4 X 46 = 248,4 m³

2 Galian Pondasi Batu Kali


454.5 m³
Volume = 1 x 1 x 1,5= 1,5 m³
Panjang = ((45x4)-4,5)+((7,5x7x2)+7,5)+15 = 303 m
Total Galian Batu Kali = 1,5 X 303 = 454,5 m³

3 Urugan Pasir Bawah Pondasi Lajur 30.300 m³


tebal urugan =0,1 x 1 x 1 = 0,1 m³
Panjang = ((45x4)-4,5)+((7,5x7x2)+7,5)+15 = 303 m
volume = 0,1 x 303 = 30,3 m³
10

3 Urugan Tanah Kembali Urugan tanah kembali = 1/3 galian 163.43 m³


Total Galian = 1/3 x 490,28 = 163,427 m³

4 Urugan Tanah Untuk Peninggian Lantai Volume = 45 x 18 x 0,4 = 324 m3 324 m³

III Pekerjaan Pasangan Pondasi

1 Pasangan Aanstamping

Panjang = ((45x4)-4,5)+((7,5x7x2)+7,5)+15 = 303 m 60.6 m³


Luas = 0,2 x 1 = 0,2 m²
Volume = 303 x 0,2 = 60,6 m³
2 Pasangan Batu Belah 133.32 m³
Panjang = 303 m
30 Volume = 0.5x (0,30+0,8) x 0,8 = 0,44 m³
Total Volume = 0,44 x 303 = 133,32 m³

80

80

IV Pekerjaan Beton Bertulang


1 Lantai Kerja FootPlat 10.35 m³
Jumlah = 46
Tebal Lantai Kerja = 1,5x1,5x0,1 = 0,225 m³
Volume Total = 0,225 x 46 = 10,35 m³
10

180
2 Pondasi FootPlat 41.4 m³

Jumlah = 46 Buah
Volume = 1,5 x 1,5 x 0,40 = 0,9 m³

3 Sloof 25/40 panjang 303 m¹ 30.3 m³


volume = 0.25 x 0.40 x 303 = 30,3 m³
0.40

20 *berat besi sloof/m3 6060 kg

0.25 15

4 Kolom 40/40 jumlah kolom 46 buah 45.1168 m³


panjang tiap kolom 613 cm
volume = 0.4 x 0.4 x 6,13 x 46 = 29,44 m³
0
3

*berat besi kolom/m3 13535 kg

30
5 Balok Induk 30/50 panjang 393 m 58.95 m³
volume = 0.30 x 0.50 x 393 = 58,95 m³

*berat besi balok induk/m3 11790 kg


0.5

0.30
6 Balok Anak 25/40 panjang 90 m 9 m³
volume = 0.25 x 0.40 x 90 = 9 m³

*berat besi balok anak/m3 1350 kg

0.4
0.25
7 Pelat lantai tebal 12 cm 92.34 m³
Luas = (18*45)+27 - Void (33,7*2) = 769,5 m²
Volume = 769,5 x 0,12 = 92,34 m³
*berat besi plat/m3 13851 kg

II Lantai 2
1 Kolom 40/40 jumlah kolom 46 buah 29.44 m³
panjang tiap kolom 400 cm
volume = 0.40 x 0.40 x 4.0 x 46 = 29,44 m³

*berat besi kolom/m3 8832 kg

2 Balok induk 30 x 50 panjang 393 m 58.95 m³


volume = 0.30 x 0.50 x 393 = 58,95 m³
0
4

*berat besi balok induk/m3 11790 kg


0.5

20

0.30
3 Balok Anak 25 x 40 panjang 90 m 9 m³
volume = 0.25 x 0.40 x 90 = 9 m³

*berat besi balok anak/m3 1350 kg


0.4

0.25
4 Plat Lantai 12 cm tebal 12 cm 92.34 m³
Luas = (18*45)+27 - Void (33,7*2) = 769,5 m²
0
5

Volume = 769,5 x 0,12 = 92,34 m³


*berat besi plat/m3 13851 kg

25
III Lantai 3
1 Kolom 40/40 jumlah kolom 46 buah 29.44 m³
panjang tiap kolom 400 cm
volume = 0.40 x 0.40 x 4.0 x 46 = 29,44 m³

*berat besi kolom/m3 8832 kg

2 Ring Balok 25 x 40 Panjang 223,5 m 22.35 m³


Volume = 0.25 x 0.4 x 223,5 = 22,35 m³

*berat besi balok induk/m3 3352.5 kg

0.4

0.25

IV Pekerjaan Struktur Rangka Atap


1 Kuda-kuda baja profil siku 9,858.20 Kg
Jumlah Kuda Kuda = 10 Bh
Profil 65.65.7
Panjang = 2 x (1,655 x 12) = 39,72 m
Berat = 39,72 x 6,83 = 271,29 Kg

Profil 60.60.6
Panjang = (2x18)+(2x23,96)+(2x24,2) = 132,32 m
Berat = 132,32 x 5,4 = 714,53 Kg

Berat Total = 271,29 + 714,53 = 985,818 Kg

2 Gording C.150.75.20.4 (11 Kg/m) ~ 457,99 m 5,037.89 Kg

3 Listplank Keliling = (2x18) + (2x45)+24 = 150 m 150.00 m

4 Galvalum Luar Atap 877.14 m2


L.Trapesium = ((27 + 45)/0,5)x 9 x 2 = 648 m2
L.Segitiga = 0,5 x 12,73 x 18 x 2 = 229,14 m2

V PEKERJAAN TANGGA
1 Tangga beton
volume beton plat tangga
(3,53 x 0,15 x 1,33) x 2 = 1,4087 1.40847 m³
volume beton anak tangga
(( 0,5 x 0,18 x 0,29)x1,33 ) x 21 = 0,729 0.72897 m³
volume beton plat bordes
(2,5 x 3 x 0.15 ) = 1,125 1.125 m³
volume balok bordes
( 3 x 0,25 x 0,40 ) = 0,3 0.3 m³

Total volume Tangga 7.12489 m³


REKAP PERHITUNGAN VOLUME

PEKERJAAN : PEMBANGUNAN GEDUNG FAKULTAS TARBIYAH STAIN PONOROGO


LOKASI : PONOROGO - JAWA TIMUR
T.A : 2017

No JENIS PEKERJAAN Satuan Volume


A PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m² 2,800.00
2 Pembuatan Pagar Proyek m' 220.00
3 Pembuatan Direksi Keet m² 28.00
4 Pembuatan Barak Pekerja dan KM/WC m² 36.50
5 Pembuatan Gudang m² 32.00
6 Pembuatan Pos Jaga m² 4.00
8 Pekerjaan Bowplank m' 48.00
9 Papan Nama Proyek Ls 1.00
10 Penerangan Kerja Harian Ls 1.00
11 Pengadaan Air Kerja Ls 1.00

B BANGUNAN LANTAI 1
I. PEKERJAAN TANAH
1 Galian tanah pondasi foot plat m³ 248.40
2 Galian Tanah Pondasi Batu Kali m³ 454.50
3 Urugan pasir bawah pondasi lajur m³ 30.30
4 Urugan Tanah Kembali m³ 163.43
5 Urugan tanah dipadatkan mendatangkan untuk peninggian lantai m³ 184.80

II. PEKERJAAN PASANGAN PONDASI


2 Pasangan Aanstamping m³ 60.60
3 Pasangan Batu Belah m³ 133.32

III. PEKERJAAN STRUKTUR BETON


1 Lantai Kerja Footplat m³ 10.35
1 Beton foot plat m³ 41.40
2 Sloof 25/40 m³ 30.30
4 Kolom 40/40 m³ 45.12
5 Beton balok Induk 30/50 cm m³ 58.95
6 Beton balok anak 25/40 cm m³ 9.00
7 Beton plat lantai tebal 12 cm m³ 92.34

IV PEKERJAAN TANGGA
1 Tangga Beton m³ 7.12

C BANGUNAN LANTAI 2
I PEKERJAAN STRUKTUR BETON
1 Kolom 40/40 m³ 29.44
2 Balok Induk 30/50 m³ 58.95
3 Balok Anak 25/40 m³ 9.00
4 Beton plat lantai tebal 12 cm m³ 92.34

II PEKERJAAN TANGGA
5 Tangga Beton m³ 7.12

D BANGUNAN LANTAI 3
PEKERJAAN STRUKTUR BETON
1 Kolom 40/40 m³ 29.44
2 Ring Balok 25/40 m³ 22.35

E BANGUNAN STRUKTUR RANGKA ATAP


1 Pasang kuda-kuda baja siku 65.65.7 dan 60.60.6 Kg 9,858.20
2 Pasang Gording C.150.75.20.4,5 Kg 5,037.89
Harga
Satuan
No Uraian SatuanKoefisien
Material/Upa
A B C D hE
2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
2.2.1.1 Pembuatan 1 m' Pagar sementara dari seng gelombang tingg
A. Tenaga
Pekerja Oh 0.200 Rp 65,000.00
Tukang Kayu Oh 0.400 Rp 75,000.00
Kepala Tukang Oh 0.020 Rp 80,000.00
Mandor Oh 0.020 Rp 85,000.00
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 1.250 Rp 30,300.00
Semen Portland Kg 2.500 Rp 1,650.00
Seng gelombang 3" x 6" bjls 2 Lbr 1.200 Rp 89,000.00
Pasir beton m3 0.005 Rp411,400.00
Batu pecah 2/3 m3 0.009 Rp326,700.00
Kayu balok 5/7 Meranti m3 0.072 ###
Paku Biasa Kg 0.060 Rp 16,900.00
Residu Ltr 0.450 Rp 20,100.00
C. Peralatan

2.2.1.2 Pengukuran dan pemasangan 1 m' Bouwplank


A. Tenaga
Pekerja Oh 0.100 Rp 65,000.00
Tukang Kayu Oh 0.100 Rp 75,000.00
Kepala Tukang Oh 0.010 Rp 80,000.00
Mandor Oh 0.005 Rp 85,000.00
B. Bahan
Kayu balok 5/7 Meranti Btg 0.012 ###
Paku Biasa Kg 0.020 Rp 16,900.00
Kayu papan 3/20 m' 0.007 Rp 13,000.00
C. Peralatan

2.2.1.3 Pembuatan 1 m2 kantor sementara dengan lantai plesteran


A. Tenaga
Pekerja Oh 2.000 Rp 65,000.00
Tukang Kayu Oh 2.000 Rp 75,000.00
Tukang Batu Oh 1.000 Rp 75,000.00
Kepala Tukang Oh 0.300 Rp 80,000.00
Mandor Oh 0.050 Rp 85,000.00
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 1.250 Rp 30,300.00
Kayu balok 5/7 m3 0.180 ###
Paku Biasa Kg 0.080 Rp 16,900.00
Besi strip Kg 1.100 Rp 15,000.00
Semen Portland Kg 35.000 Rp 1,650.00
Pasir pasang m3 0.150 Rp 302,500.00
Pasir beton m3 0.100 Rp 411,400.00
Batu pecah 2/3 m3 0.150 Rp 326,700.00
Bata merah Bh 30.000 Rp 1,000.00
Seng Plat 3' x 6' BJLS 28 Lbr 0.250 Rp 48,300.00
Jendela nako Bh 0.200 Rp 203,500.00
Kaca Polos Tebal 5 mm m2 0.080 Rp 94,300.00
Kunci tanam biasa Bh 0.150 Rp 110,000.00
Plywood tebal 9 mm ukuran (12 Lbr 0.060 Rp 141,200.00
C. Peralatan

2.2.1.4 Pembuatan 1 m2 rumah jaga (konstruksi kayu)


A. Tenaga
Pekerja Oh 1.000 Rp 65,000.00
Tukang Kayu Oh 1.500 Rp 75,000.00
Kepala Tukang Oh 0.150 Rp 80,000.00
Mandor Oh 0.050 Rp 85,000.00
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 3.000 Rp 30,300.00
Kayu balok 5/7 m3 0.276 ###
Paku Biasa Kg 0.700 Rp 16,900.00
Seng gelombang 3" x 6" bjls 2 Kg 1.500 Rp 89,000.00
C. Peralatan

2.2.1.5 Pembuatan 1 m2 gudang semen dan Peralatan


A. Tenaga
Pekerja Oh 1.000 Rp 65,000.00
Tukang Kayu Oh 2.000 Rp 75,000.00
Kepala Tukang Oh 0.200 Rp 80,000.00
Mandor Oh 0.050 Rp 85,000.00
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 1.700 Rp 30,300.00
Kayu balok 5/7 m3 0.210 ###
Paku Biasa Kg 0.300 Rp 16,900.00
Semen Portland Kg 10.500 Rp 1,650.00
Pasir beton m3 0.030 Rp 411,400.00
Batu pecah 2/3 m3 0.050 Rp 326,700.00
Seng gelombang 3" x 6" bjls 2 Lbr 1.500 Rp 89,000.00
Seng Plat 3' x 6' BJLS 28 Lbr 0.250 Rp 48,300.00
C. Peralatan

2.2.1.6 Pembuatan 1 m2 bedeng pekerja


A. Tenaga
Pekerja Oh 1.000 Rp 65,000.00
Tukang Kayu Oh 2.000 Rp 75,000.00
Kepala Tukang Oh 0.200 Rp 80,000.00
Mandor Oh 0.050 Rp 85,000.00
B. Bahan
Dolken kayu Ø 8 - 10 /400 cm Btg 1.250 Rp 30,300.00
Kayu balok 5/7 m3 0.186 ###
Paku Biasa Kg 0.300 Rp 16,900.00
Semen Portland Kg 18.000 Rp 1,650.00
Pasir beton m3 0.030 Rp 411,400.00
Batu pecah 2/3 m3 0.050 Rp 326,700.00
Seng gelombang 3" x 6" bjls 2 Lbr 1.500 Rp 89,000.00
Plywood tebal 9 mm ukuran (12 Lbr 1.350 Rp 141,200.00
C. Peralatan

2.2.1.7 Pembersihan 1 m2 lapangan dan perataan


A. Tenaga
Pekerja Oh 0.100 Rp 65,000.00
Mandor Oh 0.050 Rp 85,000.00
B. Bahan Rp -
C. Peralatan

2.2.1.8 Pembuatan 1 m2 steger/perancah dari bambu


A. Tenaga
Pekerja OH 1.000 Rp 65,000.00
Tukang Kayu OH 2.000 Rp 75,000.00
Kepala Tukang OH 0.200 Rp 80,000.00
Mandor OH 0.050 Rp 85,000.00
B. Bahan
Bambu Ø 6 - 8 /600 cm Btg 1.250 Rp 16,500.00
Tali Ijuk m3 0.186 Rp 22,000.00
C. Peralatan

2.3.1 HARGA SATUAN PEKERJAAN TANAH


2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
A. Tenaga
Pekerja OH 0.750 Rp 65,000.00
Mandor OH 0.025 Rp 85,000.00
B. Bahan Rp -
C. Peralatan

2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 3 m


A. Tenaga
Pekerja OH 1.050 Rp 65,000.00
Mandor OH 0.067 Rp 85,000.00
B. Bahan Rp -
C. Peralatan
2.3.1.2 Pengurugan kembali 1 m3 galian tanah
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
A. Tenaga
Pekerja OH 0.500 Rp 65,000.00
Mandor OH 0.050 Rp 85,000.00
B. Bahan Rp -
C. Peralatan

2.3.1.3 Pengurugan 1 m3 dengan pasir urug


A. Tenaga
Pekerja OH 0.300 Rp 65,000.00
Mandor OH 0.010 Rp 85,000.00
B. Bahan
Pasir urug m3 1.200 Rp 168,300.00
C. Peralatan

2.3.1.13 Pengurugan 1 m3 sirtu padat


A. Tenaga
Pekerja OH 0.250 Rp 65,000.00
Mandor OH 0.025 Rp 85,000.00
B. Bahan
Sirtu m3 1.200 Rp 155,100.00
C. Peralatan

3.2.1 HARGA SATUAN PEKERJAAN PONDASI


3.2.1.1 Pemasangan 1 m3 pondasi batu belah campuran 1PC : 3PP
A. Tenaga
Pekerja OH 1.500 Rp 65,000.00
Tukang Batu OH 0.750 Rp 75,000.00
Kepala Tukang OH 0.075 Rp 80,000.00
Mandor OH 0.075 Rp 85,000.00
B. Bahan
Batu belah 15/20 m3 1.200 Rp 278,300.00
Semen Portland kg 202.000 Rp 1,650.00
Pasir pasang m3 0.485 Rp 302,500.00
C. Peralatan

3.2.1.2 Pemasangan 1 m3 batu kosong (anstamping)


A. Tenaga
Pekerja OH 0.780 Rp 65,000.00
Tukang Batu OH 0.390 Rp 75,000.00
Kepala Tukang OH 0.039 Rp 80,000.00
Mandor OH 0.039 Rp 85,000.00
B. Bahan
Batu belah 15/20 m3 1.200 Rp 278,300.00
Pasir urug m3 0.432 Rp 168,300.00
C. Peralatan

4.1.1 HARGA SATUAN PEKERJAAN BETON


4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f', = 7,4 MPa (K 100), slump (3-6)
A. Tenaga
Pekerja OH 1.200 Rp 65,000.00
Tukang Batu OH 0.200 Rp 75,000.00
Kepala Tukang OH 0.020 Rp 80,000.00
Mandor OH 0.060 Rp 85,000.00
B. Bahan
Semen Portland Kg 230.000 Rp 1,650.00
Pasir Beton m3 0.638 Rp 411,400.00
Batu pecah 3/5 m3 0.761 Rp 326,700.00
Air Ltr 200.000 Rp 70.00
C. Peralatan

4.1.1.1 Membuat 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 ± 2) cm, w/o
A. Tenaga
Pekerja OH 1.650 Rp 65,000.00
Tukang Batu OH 0.275 Rp 75,000.00
Kepala Tukang OH 0.028 Rp 80,000.00
Mandor OH 0.083 Rp 85,000.00
B. Bahan
Semen Portland Kg 406.000 Rp 1,650.00
Pasir Beton m3 0.489 Rp 411,400.00
Batu pecah 3/5 m3 0.760 Rp 326,700.00
Air Ltr 215.000 Rp 70.00
C. Peralatan

4.1.1.2 Pembesian 10 kg dengan besi Ulir


A. Tenaga
Pekerja OH 0.070 Rp 65,000.00
Tukang Besi OH 0.070 Rp 75,000.00
Kepala Tukang OH 0.007 Rp 80,000.00
Mandor OH 0.004 Rp 85,000.00
B. Bahan
Besi beton Ulir Kg 10.500 Rp 9,134.00
Kawat ikat beton Kg 0.150 Rp 15,000.00
C. Peralatan

4.1.1.3 Pembesian 10 kg dengan besi polos


A. Tenaga
Pekerja OH 0.070 Rp 65,000.00
Tukang Besi OH 0.070 Rp 75,000.00
Kepala Tukang OH 0.007 Rp 80,000.00
Mandor OH 0.004 Rp 85,000.00
B. Bahan
Besi beton polos Kg 10.500 Rp 8,610.00
Kawat ikat beton Kg 0.150 Rp 15,000.00
C. Peralatan

4.1.1.4 Pemasangan 1 m2 bekisting untuk pondasi


A. Tenaga
Pekerja OH 0.520
Tukang Besi OH 0.260
Kepala Tukang OH 0.026
Mandor OH 0.026
B. Bahan
Kayu Begesting m3 0.040 ###
Paku Biasa Kg 0.300 Rp 16,900.00
Minyak bekisting Ltr 0.100 Rp 5,000.00
C. Peralatan

4.1.1.5 Pemasangan 1 m2 bekisting untuk sloof


A. Tenaga
Pekerja OH 0.520
Tukang Kayu OH 0.260
Kepala Tukang OH 0.026
Mandor OH 0.026
B. Bahan
Kayu Begesting Meranti m3 0.045 ###
Paku Biasa Kg 0.300 Rp 16,900.00
Minyak bekisting Ltr 0.100 Rp 5,000.00
C. Peralatan

4.1.1.6 Pemasangan 1 m2 bekisting untuk kolom


A. Tenaga
Pekerja OH 0.660
Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033
B. Bahan
Kayu Begesting m3 0.040 ###
Paku Biasa Kg 0.400 Rp 16,900.00
Minyak bekisting Ltr 0.200 Rp 5,000.00
Kelas II (kayu kalimantan/borne m3 0.015 ###
Plywood tebal 9 mm (120 x 240 Lbr 0.350 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 2.000 Rp 30,300.00
C. Peralatan

4.1.1.7 Pemasangan 1 m2 bekisting untuk balok


A. Tenaga
Pekerja OH 0.660
Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033
B. Bahan
Kayu Begesting m3 0.040 ###
Paku Biasa Kg 0.400 Rp 16,900.00
Minyak bekisting Ltr 0.200 Rp 5,000.00
Kelas II (kayu kalimantan/borne m3 0.018 ###
Plywood tebal 9 mm (120 x 240 Lbr 0.350 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 2.000 Rp 30,300.00
C. Peralatan

4.1.1.8 Pemasangan 1 m2 bekisting untuk lantai


A. Tenaga
Pekerja OH 0.660
Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033
B. Bahan
Kayu Begesting m3 0.040 ###
Paku Biasa Kg 0.400 Rp 16,900.00
Minyak bekisting Ltr 0.200 Rp 5,000.00
Kelas II (kayu kalimantan/borne m3 0.015 ###
Plywood tebal 9 mm (120 x 240 Lbr 0.350 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 6.000 Rp 30,300.00
C. Peralatan

4.1.1.9 Pemasangan 1 m2 bekisting untuk tangga


A. Tenaga
Pekerja OH 0.660
Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033
B. Bahan
Kayu Begesting m3 0.030 ###
Paku Biasa Kg 0.400 Rp 16,900.00
Minyak bekisting Ltr 0.150 Rp 5,000.00
Kelas II (kayu kalimantan/borne m3 0.015 ###
Plywood tebal 9 mm (120 x 240 Lbr 0.350 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 2.000 Rp 30,300.00
C. Peralatan

4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f', = 7,4 MPa (K 100),
A. Tenaga
Pekerja OH 1.200 Rp 65,000.00
Tukang Batu OH 0.200 Rp 75,000.00
Kepala Tukang OH 0.020 Rp 80,000.00
Mandor OH 0.060 Rp 85,000.00
B. Bahan
Semen Portland Kg 230.000 Rp 1,650.00
Pasir Beton m3 0.638 Rp 411,400.00
Batu pecah 3/5 m3 0.761 Rp 326,700.00
Air Ltr 200.000 Rp 70.00
C. Peralatan

4.1.1.27 Pembuatan 1 m3 pondasi beton bertulang (150 kg besi + beki


A. Tenaga
Pekerja OH 5.300 Rp 65,000.00
Tukang batu OH 0.275 Rp 75,000.00
Tukang kayu OH 1.300 Rp 75,000.00
Tukang besi OH 1.050 Rp 75,000.00
Kepala Tukang OH 0.262 Rp 80,000.00
Mandor OH 0.265 Rp 85,000.00
B. Bahan
Kayu Begesting m3 0.200 ###
Paku Biasa Kg 1.500 Rp 16,900.00
Minyak bekisting Ltr 0.400 Rp 5,000.00
Besi beton polos Kg 157.500 Rp 8,610.00
Kawat ikat beton Kg 2.250 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
C. Peralatan

4.1.1.28 Pembuatan 1 m3 sloof beton bertulang (200 kg besi + bekisting) f’c 25


A. Tenaga
Pekerja OH 5.650 Rp 65,000.00
Tukang batu OH 0.275 Rp 75,000.00
Tukang kayu OH 1.560 Rp 75,000.00
Tukang besi OH 1.400 Rp 75,000.00
Kepala Tukang OH 0.323 Rp 80,000.00
Mandor OH 0.283 Rp 85,000.00
B. Bahan
Kayu Begesting m3 0.270 ###
Paku Biasa Kg 2.000 Rp 16,900.00
Minyak bekisting Ltr 0.600 Rp 5,000.00
Besi beton polos Kg 210.000 Rp 8,610.00
Kawat ikat beton Kg 3.000 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
C. Peralatan

4.1.1.29 Pembuatan 1 m3 kolom beton bertulang (300 kg besi + bekist


A. Tenaga
Pekerja OH 7.050 Rp 65,000.00
Tukang batu OH 0.275 Rp 75,000.00
Tukang kayu OH 1.650 Rp 75,000.00
Tukang besi OH 2.100 Rp 75,000.00
Kepala Tukang OH 0.403 Rp 80,000.00
Mandor OH 0.353 Rp 85,000.00
B. Bahan
Kayu Begesting m3 0.400 ###
Paku Biasa Kg 4.000 Rp 16,900.00
Minyak bekisting Ltr 2.000 Rp 5,000.00
Besi beton polos Kg 315.000 Rp 8,610.00
Kawat ikat beton Kg 4.500 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
Kelas II (kayu kalimantan/borne m3 0.150 ###
Plywood tebal 9 mm (120 x 240 Lbr 3.500 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 20.000 Rp 30,300.00
C. Peralatan

4.1.1.30 Pembuatan 1 m3 balok beton bertulang (200 kg besi + bekist


A. Tenaga
Pekerja OH 6.350 Rp 65,000.00
Tukang batu OH 0.275 Rp 75,000.00
Tukang kayu OH 1.650 Rp 75,000.00
Tukang besi OH 1.400 Rp 75,000.00
Kepala Tukang OH 0.333 Rp 80,000.00
Mandor OH 0.318 Rp 85,000.00
B. Bahan
Kayu Begesting m3 0.320 ###
Paku Biasa Kg 3.200 Rp 16,900.00
Minyak bekisting Ltr 1.600 Rp 5,000.00
Besi beton polos Kg 210.000 Rp 8,610.00
Kawat ikat beton Kg 3.000 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
Kelas II (kayu kalimantan/borne m3 0.140 ###
Plywood tebal 9 mm (120 x 240 Lbr 2.800 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 16.000 Rp 30,300.00
C. Peralatan

4.1.1.31 Pembuatan 1 m3 balok beton bertulang (150 kg besi + bekis


A. Tenaga
Pekerja OH 6.350 Rp 65,000.00
Tukang batu OH 0.275 Rp 75,000.00
Tukang kayu OH 1.650 Rp 75,000.00
Tukang besi OH 1.400 Rp 75,000.00
Kepala Tukang OH 0.333 Rp 80,000.00
Mandor OH 0.318 Rp 85,000.00
B. Bahan
Kayu Begesting m3 0.320 ###
Paku Biasa Kg 3.200 Rp 16,900.00
Minyak bekisting Ltr 1.600 Rp 5,000.00
Besi beton polos Kg 157.500 Rp 8,610.00
Kawat ikat beton Kg 3.000 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
Kelas II (kayu kalimantan/borne m3 0.140 ###
Plywood tebal 9 mm (120 x 240 Lbr 2.800 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 16.000 Rp 30,300.00
C. Peralatan

4.1.1.32 Pembuatan 1 m3 plat beton bertulang (150 kg besi + bekistin


A. Tenaga
Pekerja OH 5.300 Rp 65,000.00
Tukang batu OH 0.275 Rp 75,000.00
Tukang kayu OH 1.300 Rp 75,000.00
Tukang besi OH 1.050 Rp 75,000.00
Kepala Tukang OH 0.265 Rp 80,000.00
Mandor OH 0.265 Rp 85,000.00
B. Bahan
Kayu Begesting m3 0.320 ###
Paku Biasa Kg 3.200 Rp 16,900.00
Minyak bekisting Ltr 1.600 Rp 5,000.00
Besi beton polos Kg 157.500 Rp 8,610.00
Kawat ikat beton Kg 2.250 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
Kelas II (kayu kalimantan/borne m3 0.120 ###
Plywood tebal 9 mm (120 x 240 Lbr 2.800 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 32.000 Rp 30,300.00
C. Peralatan

4.1.1.33 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)


A. Tenaga
Pekerja OH 5.650 Rp 65,000.00
Tukang batu OH 0.275 Rp 75,000.00
Tukang kayu OH 1.560 Rp 75,000.00
Tukang besi OH 1.400 Rp 75,000.00
Kepala Tukang OH 0.323 Rp 80,000.00
Mandor OH 0.283 Rp 85,000.00
B. Bahan
Kayu Begesting m3 0.250 ###
Paku Biasa Kg 3.000 Rp 16,900.00
Minya Bekisting Lt 1.200 Rp 5,000.00
Besi beton polos Kg 210.000 Rp 8,610.00
Kawat ikat beton Kg 3.000 Rp 15,000.00
Semen Portland Kg 336.000 Rp 1,650.00
Pasir beton m3 0.540 Rp 411,400.00
Batu pecah 2/3 m3 0.810 Rp 326,700.00
Kelas II (kayu kalimantan/borne m3 0.105 ###
Plywood tebal 9 mm (120 x 240 Lbr 2.500 Rp 141,200.00
Dolken kayu Ø 8 - 10 /400 cm Btg 14.000 Rp 30,300.00
C. Peralatan

4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


4.2.1.1 Pemasangan 1 kg besi profil
A. Tenaga
Pekerja OH 0.060 Rp 65,000.00
Tukang Las Konstruksi OH 0.060 Rp 75,000.00
Kepala Tukang OH 0.006 Rp 80,000.00
Mandor OH 0.003 Rp 85,000.00
B. Bahan
Besi Profil Kg 1.150 Rp 15,000.00
C. Peralatan

4.2.1.2 Pengerjaan 100 kg pekerjaan perakitan


A. Tenaga
Pekerja OH 0.100 Rp 65,000.00
Tukang Besi Konstruksi OH 0.100 Rp 75,000.00
Kepala Tukang OH 0.001 Rp 80,000.00
Mandor OH 0.005 Rp 85,000.00
B. Bahan
Solar Ltr 1.000 Rp 6,500.00
Minyak pelumas Ltr 0.100 Rp 40,000.00
C. Peralatan
Sewa Alat Jam 0.800

4.2.1.3 Pengerjaan 10 cm pengelasan dengan las listrik


A. Tenaga
Pekerja OH 0.040 Rp 65,000.00
Tukang Las Konstruksi OH 0.020 Rp 75,000.00
Kepala Tukang OH 0.002 Rp 80,000.00
Mandor OH 0.002 Rp 85,000.00
B. Bahan
Kawat las Kg 0.400 Rp 26,400.00
Solar Ltr 0.300 Rp 6,500.00
Minyak pelumas Ltr 0.040 Rp 40,000.00
C. Peralatan
Sewa Alat Jam 0.170
4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
4.5.2.1 Pemasangan 1 m2 atap genteng kodok glazur
A. Tenaga
Pekerja OH 0.150 Rp 65,000.00
Tukang Kayu OH 0.075 Rp 75,000.00
Kepala Tukang OH 0.008 Rp 80,000.00
Mandor OH 0.008 Rp 85,000.00
B. Bahan
Genteng Kodok Glazur Bh 25.000 Rp 5,500.00
C. Peralatan

4.5.2.2 Pemasangan 1 m' bubung genteng kodok glazur


A. Tenaga
Pekerja OH 0.400 Rp 65,000.00
Tukang Kayu OH 0.200 Rp 75,000.00
Kepala Tukang OH 0.020 Rp 80,000.00
Mandor OH 0.002 Rp 85,000.00
B. Bahan
Genteng bubung kodok Bh 5.000 Rp 22,600.00
Semen Portland Kg 8.000 Rp 1,650.00
Pasir Pasang m3 0.032 Rp 302,500.00
C. Peralatan

4.6.1.12 Pemasangan 1 m2 rangka atap genteng kayu kelas II


A. Tenaga
Pekerja OH 0.100 Rp 65,000.00
Tukang Kayu OH 0.100 Rp 75,000.00
Kepala Tukang OH 0.010 Rp 80,000.00
Mandor OH 0.005 Rp 85,000.00
B. Bahan
Kelas II (kayu kamper) kaso m3 0.014 ###
Kelas II (kayu kamper) reng m3 0.036 ###
Paku Biasa Kg 0.250 Rp 16,900.00
C. Peralatan

4.6.1.18 Pemasangan 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I at


A. Tenaga
Pekerja OH 0.100 Rp 65,000.00
Tukang Kayu OH 0.200 Rp 75,000.00
Kepala Tukang OH 0.020 Rp 80,000.00
Mandor OH 0.005 Rp 85,000.00
B. Bahan
Papan Kayu m3 0.011 ###
Paku Biasa Kg 0.050 Rp 16,900.00
C. Peralatan
Jumlah
Material/Upah No Uraian Satuan Koefisien
H=(DxE) A B C D
2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
Rp 631,896.30 2.2.1.1 Pembuatan 1 m' Pagar sementara dari seng gelombang tinggi 2 meter
Rp 46,300.00 A. Tenaga
Rp 13,000.00 Pekerja Oh 0.2
Rp 30,000.00 Tukang Kayu Oh 0.4
Rp 1,600.00 Kepala Tukang Oh 0.02
Rp 1,700.00 Mandor Oh 0.02
Rp 585,596.30 B. Bahan
Rp 37,875.00 Dolken kayu Ø 8 - 10 /400 cm Btg 1.25
Rp 4,125.00 Semen Portland Kg 2.5
Rp 106,800.00 Seng gelombang 3" x 6" bjls 28 Lbr 1.2
Rp 2,057.00 Pasir beton m3 0.005
Rp 2,940.30 Batu pecah 2/3 m3 0.009
Rp 421,740.00 Kayu balok 5/7 Meranti m3 0.072
Rp 1,014.00 Paku Biasa Kg 0.06
Rp 9,045.00 Residu Ltr 0.45
C. Peralatan
Rp 631,896.30
Rp 87,860.40 2.2.1.2 Pengukuran dan pemasangan 1 m' Bouwplank
Rp 15,225.00 A. Tenaga
Rp 6,500.00 Pekerja Oh 0.1
Rp 7,500.00 Tukang Kayu Oh 0.1
Rp 800.00 Kepala Tukang Oh 0.01
Rp 425.00 Mandor Oh 0.005
Rp 72,635.40 B. Bahan
Rp 72,206.40 Kayu balok 5/7 Meranti Btg 0.012
Rp 338.00 Paku Biasa Kg 0.02
Rp 91.00 Kayu papan 3/20 m' 0.007
C. Peralatan
Rp 87,860.40
### 2.2.1.3 Pembuatan 1 m2 kantor sementara dengan lantai plesteran
Rp 383,250.00 A. Tenaga
Rp 130,000.00 Pekerja Oh 2
Rp 150,000.00 Tukang Kayu Oh 2
Rp 75,000.00 Tukang Batu Oh 1
Rp 24,000.00 Kepala Tukang Oh 0.3
Rp 4,250.00 Mandor Oh 0.05
### B. Bahan
Rp 37,875.00 Dolken kayu Ø 8 - 10 /400 cm Btg 1.25
Rp 1,083,096.00 Kayu balok 5/7 m3 0.18
Rp 1,352.00 Paku Biasa Kg 0.08
Rp 16,500.00 Besi strip Kg 1.1
Rp 57,750.00 Semen Portland Kg 35
Rp 45,375.00 Pasir pasang m3 0.15
Rp 41,140.00 Pasir beton m3 0.1
Rp 49,005.00 Batu pecah 2/3 m3 0.15
Rp 30,000.00 Bata merah Bh 30
Rp 12,075.00 Seng Plat 3' x 6' BJLS 28 Lbr 0.25
Rp 40,700.00 Jendela nako Bh 0.2
Rp 7,544.00 Kaca Polos Tebal 5 mm m2 0.08
Rp 16,500.00 Kunci tanam biasa Bh 0.15
Rp 8,472.00 Plywood tebal 9 mm ukuran (120 x 240) Lbr 0.06
C. Peralatan
###
### 2.2.1.4 Pembuatan 1 m2 rumah jaga (konstruksi kayu)
Rp 193,750.00 A. Tenaga
Rp 65,000.00 Pekerja Oh 1
Rp 112,500.00 Tukang Kayu Oh 1.5
Rp 12,000.00 Kepala Tukang Oh 0.15
Rp 4,250.00 Mandor Oh 0.05
### B. Bahan
Rp 90,900.00 Dolken kayu Ø 8 - 10 /400 cm Btg 3
Rp 1,660,747.20 Kayu balok 5/7 m3 0.276
Rp 11,830.00 Paku Biasa Kg 0.7
Rp 133,500.00 Seng gelombang 3" x 6" bjls 28 Kg 1.5
C. Peralatan
###
### 2.2.1.5 Pembuatan 1 m2 gudang semen dan Peralatan
Rp 235,250.00 A. Tenaga
Rp 65,000.00 Pekerja Oh 1
Rp 150,000.00 Tukang Kayu Oh 2
Rp 16,000.00 Kepala Tukang Oh 0.2
Rp 4,250.00 Mandor Oh 0.05
### B. Bahan
Rp 51,510.00 Dolken kayu Ø 8 - 10 /400 cm Btg 1.7
Rp 1,263,612.00 Kayu balok 5/7 m3 0.21
Rp 5,070.00 Paku Biasa Kg 0.3
Rp 17,325.00 Semen Portland Kg 10.5
Rp 12,342.00 Pasir beton m3 0.03
Rp 16,335.00 Batu pecah 2/3 m3 0.05
Rp 133,500.00 Seng gelombang 3" x 6" bjls 28 Lbr 1.5
Rp 12,075.00 Seng Plat 3' x 6' BJLS 28 Lbr 0.25
C. Peralatan
###
### 2.2.1.6 Pembuatan 1 m2 bedeng pekerja
Rp 235,250.00 A. Tenaga
Rp 65,000.00 Pekerja Oh 1
Rp 150,000.00 Tukang Kayu Oh 2
Rp 16,000.00 Kepala Tukang Oh 0.2
Rp 4,250.00 Mandor Oh 0.05
### B. Bahan
Rp 37,875.00 Dolken kayu Ø 8 - 10 /400 cm Btg 1.25
Rp 1,119,199.20 Kayu balok 5/7 m3 0.186
Rp 5,070.00 Paku Biasa Kg 0.3
Rp 29,700.00 Semen Portland Kg 18
Rp 12,342.00 Pasir beton m3 0.03
Rp 16,335.00 Batu pecah 2/3 m3 0.05
Rp 133,500.00 Seng gelombang 3" x 6" bjls 28 Lbr 1.5
Rp 190,620.00 Plywood tebal 9 mm ukuran (120 x 240) Lbr 1.35
C. Peralatan
###
Rp 10,750.00 2.2.1.7 Pembersihan 1 m2 lapangan dan perataan
Rp 10,750.00 A. Tenaga
Rp 6,500.00 Pekerja Oh 0.1
Rp 4,250.00 Mandor Oh 0.05
Rp - B. Bahan
C. Peralatan

Rp 259,967.00 2.2.1.8 Pembuatan 1 m2 steger/perancah dari bambu


Rp 235,250.00 A. Tenaga
Rp 65,000.00 Pekerja OH 1
Rp 150,000.00 Tukang Kayu OH 2
Rp 16,000.00 Kepala Tukang OH 0.2
Rp 4,250.00 Mandor OH 0.05
Rp 24,717.00 B. Bahan
Rp 20,625.00 Bambu Ø 6 - 8 /600 cm Btg 1.25
Rp 4,092.00 Tali Ijuk m3 0.186
C. Peralatan

Rp 50,875.00
Rp 50,875.00
Rp 48,750.00
Rp 2,125.00
Rp -

Rp 73,945.00
Rp 73,945.00
Rp 68,250.00
Rp 5,695.00
Rp -
Rp 36,750.00
i koefisien pekerjaan galian
Rp 36,750.00
Rp 32,500.00
Rp 4,250.00
Rp -

Rp 222,310.00
Rp 20,350.00
Rp 19,500.00
Rp 850.00
Rp 201,960.00
Rp 201,960.00

Rp 204,495.00
Rp 18,375.00
Rp 16,250.00
Rp 2,125.00
Rp 186,120.00
Rp 186,120.00

Rp 980,097.50
Rp 166,125.00
Rp 97,500.00
Rp 56,250.00
Rp 6,000.00
Rp 6,375.00
Rp 813,972.50
Rp 333,960.00
Rp 333,300.00
Rp 146,712.50

Rp 493,050.60
Rp 86,385.00
Rp 50,700.00
Rp 29,250.00
Rp 3,120.00
Rp 3,315.00
Rp 406,665.60
Rp 333,960.00
Rp 72,705.60
Rp 1,004,148.43
Rp 99,700.00
Rp 78,000.00
Rp 15,000.00
Rp 1,600.00
Rp 5,100.00
Rp 904,448.43
Rp 379,500.00
Rp 262,414.43
Rp 248,534.00
Rp 14,000.00

Rp 1,271,410.29
Rp 137,170.00
Rp 107,250.00
Rp 20,625.00
Rp 2,240.00
Rp 7,055.00
###
Rp 669,900.00
Rp 200,998.29
Rp 248,292.00
Rp 15,050.00

Rp 108,857.00
Rp 10,700.00
Rp 4,550.00
Rp 5,250.00
Rp 560.00
Rp 340.00
Rp 98,157.00
Rp 95,907.00
Rp 2,250.00

Rp 103,355.00
Rp 10,700.00
Rp 4,550.00
Rp 5,250.00
Rp 560.00
Rp 340.00
Rp 92,655.00
Rp 90,405.00
Rp 2,250.00

Rp 236,090.00

Rp 230,520.00
Rp 5,070.00
Rp 500.00

Rp 264,905.00

Rp 259,335.00
Rp 5,070.00
Rp 500.00

Rp 492,375.00

Rp 230,520.00
Rp 6,760.00
Rp 1,000.00
Rp 144,075.00
Rp 49,420.00
Rp 60,600.00

Rp 521,190.00
Rp 230,520.00
Rp 6,760.00
Rp 1,000.00
Rp 172,890.00
Rp 49,420.00
Rp 60,600.00

Rp 613,575.00

Rp 230,520.00
Rp 6,760.00
Rp 1,000.00
Rp 144,075.00
Rp 49,420.00
Rp 181,800.00

Rp 434,495.00

Rp 172,890.00
Rp 6,760.00
Rp 750.00
Rp 144,075.00
Rp 49,420.00
Rp 60,600.00

###
Rp 99,700.00
Rp 78,000.00
Rp 15,000.00
Rp 1,600.00
Rp 5,100.00
Rp 904,448.43
Rp 379,500.00
Rp 262,414.43
Rp 248,534.00
Rp 14,000.00

###
Rp 584,860.00
Rp 344,500.00
Rp 20,625.00
Rp 97,500.00
Rp 78,750.00
Rp 20,960.00
Rp 22,525.00
###
Rp 1,152,600.00
Rp 25,350.00
Rp 2,000.00
Rp 1,356,075.00
Rp 33,750.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00

###
Rp 659,770.00
Rp 367,250.00
Rp 20,625.00
Rp 117,000.00
Rp 105,000.00
Rp 25,840.00
Rp 24,055.00
###
Rp 1,556,010.00
Rp 33,800.00
Rp 3,000.00
Rp 1,808,100.00
Rp 45,000.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00

###
Rp 822,370.00
Rp 458,250.00
Rp 20,625.00
Rp 123,750.00
Rp 157,500.00
Rp 32,240.00
Rp 30,005.00
###
Rp 2,305,200.00
Rp 67,600.00
Rp 10,000.00
Rp 2,712,150.00
Rp 67,500.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00
Rp 1,440,750.00
Rp 494,200.00
Rp 606,000.00

###
Rp 715,795.00
Rp 412,750.00
Rp 20,625.00
Rp 123,750.00
Rp 105,000.00
Rp 26,640.00
Rp 27,030.00
###
Rp 1,844,160.00
Rp 54,080.00
Rp 8,000.00
Rp 1,808,100.00
Rp 45,000.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00
Rp 1,344,700.00
Rp 395,360.00
Rp 484,800.00

###
Rp 715,795.00
Rp 412,750.00
Rp 20,625.00
Rp 123,750.00
Rp 105,000.00
Rp 26,640.00
Rp 27,030.00
###
Rp 1,844,160.00
Rp 54,080.00
Rp 8,000.00
Rp 1,356,075.00
Rp 45,000.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00
Rp 1,344,700.00
Rp 395,360.00
Rp 484,800.00

###
Rp 585,100.00
Rp 344,500.00
Rp 20,625.00
Rp 97,500.00
Rp 78,750.00
Rp 21,200.00
Rp 22,525.00
###
Rp 1,844,160.00
Rp 54,080.00
Rp 8,000.00
Rp 1,356,075.00
Rp 33,750.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00
Rp 1,152,600.00
Rp 395,360.00
Rp 969,600.00

###
Rp 659,770.00
Rp 367,250.00
Rp 20,625.00
Rp 117,000.00
Rp 105,000.00
Rp 25,840.00
Rp 24,055.00
###
Rp 1,440,750.00
Rp 50,700.00
Rp 6,000.00
Rp 1,808,100.00
Rp 45,000.00
Rp 554,400.00
Rp 222,156.00
Rp 264,627.00
Rp 1,008,525.00
Rp 353,000.00
Rp 424,200.00

AN ALUMUNIUM
Rp 26,385.00
Rp 9,135.00
Rp 3,900.00
Rp 4,500.00
Rp 480.00
Rp 255.00
Rp 17,250.00
Rp 17,250.00

Rp 25,005.00
Rp 14,505.00
Rp 6,500.00
Rp 7,500.00
Rp 80.00
Rp 425.00
Rp 10,500.00
Rp 6,500.00
Rp 4,000.00

Rp 18,540.00
Rp 4,430.00
Rp 2,600.00
Rp 1,500.00
Rp 160.00
Rp 170.00
Rp 14,110.00
Rp 10,560.00
Rp 1,950.00
Rp 1,600.00
UP ATAP
Rp 154,195.00
Rp 16,695.00
Rp 9,750.00
Rp 5,625.00
Rp 640.00
Rp 680.00
Rp 137,500.00
Rp 137,500.00

Rp 178,650.00
Rp 42,770.00
Rp 26,000.00
Rp 15,000.00
Rp 1,600.00
Rp 170.00
Rp 135,880.00
Rp 113,000.00
Rp 13,200.00
Rp 9,680.00

Rp 451,786.20
Rp 15,225.00
Rp 6,500.00
Rp 7,500.00
Rp 800.00
Rp 425.00
Rp 436,561.20
Rp 124,187.00
Rp 308,149.20
Rp 4,225.00

Rp 272,970.00
Rp 23,525.00
Rp 6,500.00
Rp 15,000.00
Rp 1,600.00
Rp 425.00
Rp 249,445.00
Rp 248,600.00
Rp 845.00
Harga Satuan MateJumlah Material/Upah
E H=(DxE)

bang tinggi 2 meter 631896.3


46300
65000 13000
75000 30000
80000 1600
85000 1700
585596.3
30300 37875
1650 4125
89000 106800
411400 2057
326700 2940.3
5857500 421740
16900 1014
20100 9045

631896.3
87860.4
15225
65000 6500
75000 7500
80000 800
85000 425
72635.4
6017200 72206.4
16900 338
13000 91

87860.4
1830634
383250
65000 130000
75000 150000
75000 75000
80000 24000
85000 4250
1447384
30300 37875
6017200 1083096
16900 1352
15000 16500
1650 57750
302500 45375
411400 41140
326700 49005
1000 30000
48300 12075
203500 40700
94300 7544
110000 16500
141200 8472

1830634
2090727.2
193750
65000 65000
75000 112500
80000 12000
85000 4250
1896977.2
30300 90900
6017200 1660747.2
16900 11830
89000 133500

2090727.2
1747019
235250
65000 65000
75000 150000
80000 16000
85000 4250
1511769
30300 51510
6017200 1263612
16900 5070
1650 17325
411400 12342
326700 16335
89000 133500
48300 12075

1747019
1779891.2
235250
65000 65000
75000 150000
80000 16000
85000 4250
1544641.2
30300 37875
6017200 1119199.2
16900 5070
1650 29700
411400 12342
326700 16335
89000 133500
141200 190620

1779891.2
10750
10750
65000 6500
85000 4250
0 0

259967
235250
65000 65000
75000 150000
80000 16000
85000 4250
24717
16500 20625
22000 4092
REKAPITULASI AWAL
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GEDUNG FAKULTAS TARBIYAH STAIN PONOROGO
KEMENTRIAN AGAMA PROVINSI JAWA TIMUR
PONOROGO - JAWA TIMUR
TAHUN ANGGARAN 2017

HAGA JUMLAH
NO URAIAN PEKERJAAN SATUAN
VOLUME
SATUAN (Rp) HARGA (Rp)
A PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m² ### 10,750.00 30,100,000.00
2 Pembuatan Pagar Proyek m' 220.00 631,896.30 ###
3 Pembuatan Direksi Keet m² 28.00 1,830,634.00 51,257,752.00
4 Pembuatan Barak Pekerja dan KM/WC m² 36.50 1,779,891.20 64,966,028.80
5 Pembuatan Gudang m² 32.00 1,747,019.00 55,904,608.00
6 Pembuatan Pos Jaga m² 4.00 2,090,727.20 8,362,908.80
8 Pekerjaan Bowplank m' 48.00 87,860.40 4,217,299.20
9 Papan Nama Proyek Ls 1.00 1,000,000.00 1,000,000.00
10 Penerangan Kerja Harian Ls 1.00 8,000,000.00 8,000,000.00
11 Pengadaan Air Kerja Ls 1.00 5,000,000.00 5,000,000.00

B LANTAI 1
I PEKERJAAN TANAH
1 Galian tanah pondasi foot plat m³ 248.40 73,945.00 18,367,938.00
2 Galian Tanah Pondasi Batu Kali m³ 454.50 50,875.00 23,122,687.50
3 Urugan pasir bawah pondasi lajur m³ 30.30 222,310.00 6,735,993.00
4 Urugan Kembali m³ 163.43 36,750.00 6,005,942.25
5 Urugan tanah sirtu m³ 324.00 204,495.00 66,256,380.00

II PEKERJAANPASANGAN PONDASI
2 Pasangan Aanstamping m3 60.60 493,050.60 29,878,866.36
3 Pasangan Batu Belah m3 133.32 980,097.50 ###

III PEKERJAANPASANGAN STRUKTUR BETON


1 Lantai Kerja Footplat m³ 10.35 1,004,148.43 ###
2 Beton foot plat m³ 41.40 4,195,818.00 ###
3 Sloof 25/40 m³ 30.30 5,146,863.00 ###
4 Kolom 40/40 m³ 45.12 9,566,953.00 ###
5 Beton balok Induk 30/50 cm m³ 58.95 7,741,178.00 ###
6 Beton balok anak 25/40 cm m³ 9.00 7,289,153.00 65,602,377.00
7 Beton plat lantai tebal 12 cm m³ 92.34 7,439,908.00 ###

IV PEKERJAAN TANGGA
1 Tangga Beton m³ 7.12 6,837,228.00 48,714,470.06

C LANTAI 2
I PEKERJAAN BETON
1 Kolom 40/40 m³ 29.44 9,566,953.00 ###
2 Balok Induk 30/50 m³ 58.95 7,741,178.00 ###
3 Balok Anak 25/40 m³ 9.00 7,289,153.00 65,602,377.00
4 Beton plat lantai tebal 12 cm m³ 92.34 7,439,908.00 ###

II PEKERJAAN TANGGA
1 Tangga Beton m3 7.12 6,837,228.00 48,714,470.06

D LANTAI 3
I PEKERJAAN BETON
1 Kolom 40/40 m³ 29.44 9,566,953.00 ###
2 Ring Balok 25/40 m³ 22.35 7,289,153.00 ###
E PEKERJAAN ATAP
1 Kuda-Kuda 2L.65.65.7 Kg ### 51,390.00 ###
2 Pasang Gording C.150.75.20.4,5 Kg ### 51,390.00 ###

Total (Rp)
N PONOROGO
UR

JUMLAH
HARGA (Rp)

###

###

###

###
###

###
###
PONOROGO - JAWA TIMUR
TAHUN ANGGARAN 2017

Luas Lahan 40x70= 2800 m²


Luas Bangunan 18x45x3 = 2430 m²
No Uraian Pekerjaan Total Harga
A PEKERJAAN PERSIAPAN Rp 367,825,782.80
B LANTAI 1
I PEKERJAAN TANAH Rp 120,488,940.75
II PEKERJAAN BETON DAN PONDASI Rp 2,189,885,915.38
C LANTAI 2
I PEKERJAAN BETON Rp 1,539,311,491.20
D LANTAI 3
I PEKERJAAN BETON Rp 444,563,665.87
II PEKERJAAN STRUKTUR RANGKA ATAP Rp 765,510,065.10

Jumlah ( A ) Rp 5,427,585,861.10
PPN 10% ( B ) Rp 542,758,586.11
Jumlah Total ( C) Rp 5,970,344,447.21
Jumlah Dibulatkan Rp 5,970,344,000.00

Terbilang : Empat Milyar Seratus Lima Puluh Dua Juta Tiga Ratus Lima Puluh Delapan Ribu Rupiah