Anda di halaman 1dari 7

BUKU LAPORAN HARIAN KONSULTAN PENGAWAS

PT. MULTI PHI BETA

TANGGAL : 7 Januari 2019

NAMA PROYEK : PEMBANGUNAN SIMPANG SUSUN (INTERCHANGE) BALARAJA TIMUR PADA JALAN TOL TANGERANG – MERAK
TAHUN 2018
NOMOR KONTRAK : 109/PJ/M-1/VIII/2018
KONTRAKTOR PELAKSANA : PT. ADHI KARYA
KONSULTAN PENGAWAS : PT. MULTI PHI BETA

B. TIBA/MUTASI : PERALATAN & BAHAN KONSTRUKSI POKOK


A. PEKERJAAN
NO JENIS PEKERJAAN LOKASI NO JENIS VOLUME
1 Pekerjaan Base course Agg A RAMP 3

2 Pekerjaan Sloop Pelebaran OS dan Ramp

C. PEMAKAIAN PERALATAN
NO JENIS PERALATAN JUMLAH KONDISI
1 Dozer 2

2 Excavator 2

3 Vibro sheep foot 1

4 Vibro 2

5 Motor Grader 2

6 Crane Pancang 1

D. PERSONIL KEGIATAN PENYEDIA JASA D. PERSONIL KEGIATAN PENYEDIA JASA E. KONDISI CUACA
NO TUGAS / JABATAN JUMLAH NO TUGAS / JABATAN JUMLAH NO KONDISI JAM
1. Project Manager 1 16. Project Production Manager 1
2. DCC 1 17. Supervisor 3
3. HSE 3 20. Surveyor 3
4. Quality Control 2 21. Peralatan 1
5. Project Engineer Manager 1 22. Project Finance Manager 1
6. Project Planning 1 23. Akutansi 1
7. Scheduller 1 24. Kasir 1
8. Adm Teknik 2 25. Inspector 1
9. Drafter 1 26. Operator
10. Project Control 1 27. Mandor
11. Cost Control 1 28. Pekerja
12. Quantity Surveyor 1
13. Project Procurement 1
14. Logistik 1
15. Asisten Logistik 2

F. USULAN / SARAN / INSTRUKSI


TANDA TANGAN
URAIAN
DAN NAMA JELAS

PT. Adhi Karya (Persero) Tbk.

PT. Multi Phi Beta

PT. Marga Mandalasakti


BUKU LAPORAN H
TANGGAL : 5 Desember

NAMA PROYEK : PEMBANGUNAN JEMBATAN SUNGAI CIKEAS, SENTUL SELATAN, K


NOMOR KONTRAK :
KONTRAKTOR PELAKSANA : PT ADHI KARYA (Persero) Tbk.

A. PEKERJAAN
NO JENIS PEKERJAAN LOKASI
1 Penyiapan base camp, direksi keet Area Kerja Jembatan Cikea

2 Pengukuran, staking out & positioning Area Kerja Jembatan Cikea

3 Pek. galian struktur kedalaman 2-4m Area Abutment 1

4 Pek. galian struktur kedalaman 4-6m Area Abutment 1

5 Pek. instalasi kawat bronjong Sisi Abutment Jembatan


D. PERSONIL KEGIATAN PENYEDIA JASA D. PERSONIL KEGIATAN PENYEDIA J
NO TUGAS / JABATAN JUMLAH NO TUGAS / JABATAN
1. Project Manager 1 16. Project Production Manag
2. DCC 17. Supervisor
3. HSE 20. Surveyor
4. Quality Control 21. Peralatan
5. Project Engineer Manager 1 22. Project Finance Manager
6. Project Planning 23. Akutansi
7. Scheduller 24. Kasir
8. Adm Teknik 25. Inspector
9. Drafter 1 26. Operator
10. Project Control 27. Mandor
11. Cost Control 1 28. Pekerja
12. Quantity Surveyor
13. Project Procurement 1
14. Logistik
15. Asisten Logistik

F. USULAN / SARAN / INSTRUKSI


URAIAN

PT Adhi Karya (Persero) Tbk.

PT Adhi Commuter Properti


LAPORAN HARIAN
GGAL : 5 Desember 2019

KEAS, SENTUL SELATAN, KABUPATEN BOGOR

B. TIBA/MUTASI : PERALATAN & BAHAN KONSTRUKSI POKOK

LOKASI NO JENIS VOLUME


a Kerja Jembatan Cikeas

a Kerja Jembatan Cikeas

Area Abutment 1

Area Abutment 1

si Abutment Jembatan

C. PEMAKAIAN PERALATAN
NO JENIS PERALATAN JUMLAH KONDISI
1 Excavator Standard 1
NIL KEGIATAN PENYEDIA JASA E. KONDISI CUACA
TUGAS / JABATAN JUMLAH NO KONDISI JAM
ct Production Manager 1
1
3
1
ct Finance Manager 1

TANDA TANGAN
AN
DAN NAMA JELAS
BUKU LAPORAN HARIAN
TANGGAL :

NAMA PROYEK : PEMBANGUNAN JEMBATAN SUNGAI CIKEAS, SENTUL SELATAN, KABUPATEN BOGOR
NOMOR KONTRAK :
KONTRAKTOR PELAKSANA : PT ADHI KARYA (Persero) Tbk.

B. TIBA/MUTASI : PERALATAN & BAHAN KONSTRUKSI POKOK


A. PEKERJAAN
NO JENIS PEKERJAAN LOKASI NO JENIS VOLUME

C. PEMAKAIAN PERALATAN
NO JENIS PERALATAN JUMLAH KONDISI

D. PERSONIL KEGIATAN PENYEDIA JASA D. PERSONIL KEGIATAN PENYEDIA JASA E. KONDISI CUACA
NO TUGAS / JABATAN JUMLAH NO TUGAS / JABATAN JUMLAH NO KONDISI JAM
1. Project Manager 1 16. Project Production Manager 1
2. DCC 17. Supervisor 1
3. HSE 20. Surveyor 3
4. Quality Control 21. Peralatan 1
5. Project Engineer Manager 1 22. Project Finance Manager 1
6. Project Planning 23. Akutansi
7. Scheduller 24. Kasir
8. Adm Teknik 25. Inspector
9. Drafter 1 26. Operator
10. Project Control 27. Mandor
11. Cost Control 1 28. Pekerja
12. Quantity Surveyor
13. Project Procurement 1
14. Logistik
15. Asisten Logistik

F. USULAN / SARAN / INSTRUKSI


TANDA TANGAN
URAIAN
DAN NAMA JELAS

PT Adhi Karya (Persero) Tbk.

PT Adhi Commuter Properti

Anda mungkin juga menyukai