Anda di halaman 1dari 234

PT WASKITA KARYA (PERSERO) TBK PT WASKITA KARYA (PERSERO) TBK

DAN ENTITAS ANAK AND ITS SUBSIDIARIES

LAPORAN KEUANGAN INTERIM KONSOLIDASIAN CONSOLIDATED INTERIM FINANCIAL STATEMENTS


UNTUK PERIODE SEMBILAN BULAN FOR THE NINE MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018

ONWARD THROUGH HIGH QUALITY PERFORMANCE


PT WASKITA KARYA PT WASKITA KARYA
(PERSERO) Tbk dan ENTITAS ANAK (PERSERO) Tbk and SUBSIDIARIES

Daftar Isi Halaman / Table of Contents


Pages

Surat Pernyataan Direksi Director’s Statement Letter

Laporan Keuangan Interim Konsolidasian Consolidated Interim Financial Statements


Untuk Periode 9 (Sembilan) Bulan For the 9 (Nine) Month Periods
yang Berakhir 30 September 2019 dan 2018 Ended September 30, 2019 and 2018
dan Untuk Tahun yang Berakhir and For the Year Ended
31 Desember 2018 December 31, 2018

Laporan Posisi Keuangan Interim 1 Consolidated Interim Statements of Financial


Konsolidasian Position

Laporan Laba Rugi dan Penghasilan 3 Consolidated Interim Statements of Profit or Loss
Komprehensif Lain Interim Konsolidasian and Other Comprehensive Income

Laporan Perubahan Ekuitas Interim 4 Consolidated Interim Statements of Changes in


Konsolidasian Equity

Laporan Arus Kas Interim Konsolidasian 5 Consolidated Interim Statements of Cash Flows

Catatan Atas Laporan Keuangan Interim 6 Notes to the Consolidated Interim Financial
Konsolidasian Statements
PT. WASKITA KARYA (Persero) Tbk
wAsxnn INOUSTRI KONSTRUKSI KANTOR PUSAT
G.dung w.stlt , Jl. M.T. Ha.yono Kav. No. 10, cawang - Jakarta 13340. Telp. (021)850 8510, 850 8520. Faks. (021) 850 8506. wBskna@was&te.co-ad. w*w.waskita.co.i,

PERNYATAAN DIREKSI
TENTANG
TANGGUNG JAWAB ATAS LAPORAN KEUANGAN II.ITERIM KONSOLIDASIAN
UNTUK PERTODE.PERTODE I (SETTB|LAN) BULAN YANG BERAKHTR PADA
TANGGAL 30 SEPTEMBER 2019 (T|DAK D|AUDtT)
DAN TAHUN YANG BERAKHTR 31 DESEMBER 2018 (DtAUDtT)
PT WASKITA KARYA (Persero) Tbk dan ENTITAS ANAK/

BOARD OF DIRECIOR'S SIAIEITE TT LETIER


RErITINGTO
II'E RESPO^IS'BIUTY ON THE INTERIM CONSOLIDATED FINAIJC'AI. SIAIEMEIVIS
FORTHE 9 (NiNE) MONTH PERTODS ENDED SEPTEMBER 30,2019 (UNAUDITED)
AND FOR THE YEAR ENDED DECEMBER 31, 2018 (AUDITED)
PT WASKTA KARYA (Percerc) IDk and SUBSTDTARIES
Kami yang berhnda tangan dibawah ini/ We, the undersigned:

Nama/Name I Gusti Ngurah Putra


Alamat kantor/Ofl,ce i4ddress Jl. MT Haryono Kav. No. 10 Cawang Jakarta 13340
Alamat domisili sesuai KTP/ Jl. Wirahyuda l/&18, RT 001/007, Cipinang Melayu,
Donicile as stated in lD Card Makasar, Jakarta Timur
Nomor Telepon/Phon e Nunber 021- 85085t)1
JabatarVPos ,bn Direktur utama/Pres ident Director

2. Nama/ Name Haris Gunawan


Alamat kantor/offce Address Jl. MT Haryono Kav. No. 10 Cawang Jakarta 13340
Alamat domisili sesuai KTP/ Jl. Cibogo Atas, RT 001/003, Sukawama, Sukajadi,
Donicile as slaled in lD cad Bandung
Nomor Telepon/ Prone Nunber 021- 8508510
JabatarvPostub, Direhur Keuangan/Dlrc dor of Finance

Menyatakan bahwa : Slate that ;


1. Kami bertanggung jawab atas penyusunan dan 1. We are responslb/e for he prepanton and
penyajian laporan keuangan inlerim konsolidasian; prcsentation of the consolidated inteim financial
statemenrs;
2. Laporan keuangan interim konsolidasian telah 2. The consolidated intein finandal statements have
disusun dan disajikan sesuai dengan Standar been prcparcd and presented in confomity with the
Akuntansi Keuangan di lndonesia; I ndonesian Fi nancial Accounting Standards;

3. a. Semua informasidalam laporan keuangan interim 3. a. All information in the consolidated frnanctal
konsolidasian telah dimuat s€cara lengkap dan statements have been disclosed in a conplete and
benar; truthful manner;
b. Laporan keuangan interim konsolidasian tidak b. The consolidated inteim financial statemerts do
mengandung informasi atau fakta material yang not contain any misleading natedal infomation ot
tidak benar, dan tidak menghilangkan informasi fads, and do not onit nateial infomalion or facts;
atau fakta material; dan and
4. Kami bertanggung jawab atas sistem pengendalian 4. We are responsible for intemal control systen within
intem dalam Peceroan dan Entitas Anak. the Company and its Substdianes.

Demikian pemyataan ini dibuat dengan sebenamya. This statement lefter is nade tuthfully.

Jakarta, 25 oKober 20191 October 25,2019


Dhektur Utama / 14 Direktur Keuangan /
Preside Arector Director of Finance

I Gusti Ngurah Putra Haris Gunawan

? li
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARIES
LAPORAN POSISI KEUANGAN CONSOLIDATED INTERIM STATEMENTS OF
INTERIM KONSOLIDASIAN FINANCIAL POSITION
Per 30 September 2019 dan 31 Desember 2018 As of September 30, 2019 and December 31, 2018
(Dalam Rupiah Penuh) (In Full of Rupiah)

Catatan/ 30 September/ 31 Desember/


Notes September 30, 2019 December 31, 2018
Rp Rp

ASET ASSETS
ASET LANCAR CURRENT ASSETS
Kas dan Setara Kas 3, 51, 54 3.496.054.056.402 10.845.678.217.201 Cash and Cash Equivalents
Investasi Jangka-Pendek 4 8.448.200.000 8.448.200.000 Short-Term Investments
Piutang Usaha - Bersih Accounts Receivable - Net
Pihak Berelasi 5, 54 6.222.694.024.900 2.242.057.577.361 Related Parties
Pihak Ketiga 5 1.663.957.851.050 1.526.131.112.293 Third Parties
Piutang Retensi - Bersih Retention Receivables - Net
Pihak Berelasi 7, 54 1.163.873.403.181 954.996.413.765 Related Parties
Pihak Ketiga 7 336.205.040.617 378.870.671.385 Third Parties
Piutang Lain-lain lancar - Bersih Other Current Receivable - Net
Pihak Berelasi 8, 54 4.632.885.232.690 3.631.385.077.579 Related Parties
Pihak Ketiga 8 6.081.616.185.428 5.136.564.031.224 Third Parties
Piutang Ventura Bersama 6 2.079.324.266.573 659.662.426.115 Joint Ventures Receivables
Persediaan 9 4.642.199.255.674 5.089.231.071.244 Inventories
Tagihan Bruto Kepada Pengguna Jasa Gross Amount Due From Customers
Bagian Lancar Current Portion
Pihak Berelasi 10, 54 25.645.068.542.574 24.937.285.230.226 Related Parties
Pihak Ketiga 10 4.357.305.665.809 7.413.447.932.876 Third Parties
Aset Keuangan Atas Proyek Konsesi Financial Asset From Concession Project -
Bagian Lancar 20 3.365.302.879 13.129.339.111 Current Portion
Pajak Dibayar Dimuka 11 4.348.829.367.249 2.744.222.361.192 Prepaid Taxes
Uang Muka dan Biaya Dibayar Dimuka 12 1.559.413.271.874 1.408.020.160.619 Advances and Prepayments
TOTAL ASET LANCAR 66.241.239.666.900 66.989.129.822.191 TOTAL CURRENT ASSETS

ASET TIDAK LANCAR NON-CURRENT ASSETS


Investasi Pada Entitas Asosiasi dan Investment in Associates and
Ventura Bersama 13 7.687.625.148.306 6.651.472.170.541 Joint Ventures
Piutang Lain-lain Tidak Lancar Other Non-Current Receivable
Pihak Berelasi 8, 54 38.681.366.117 36.492.465.249 Related Parties
Pihak Ketiga 8 40.363.436.530 40.363.436.530 Third Parties
Properti Investasi 14 126.279.404.689 126.279.404.689 Investment Properties
Investasi Jangka Panjang Lainnya 15 360.506.923.000 347.822.000.000 Other Long-Term Investments
Aset Tetap - Bersih 16 7.936.440.182.644 7.091.121.159.643 Fixed Assets - Net
Goodwill 17 1.995.908.825.753 1.995.908.825.753 Goodwill
Aset Tak Berwujud Intangible Assets
Hak Pengusahaan Jalan Tol 19 51.149.405.567.177 40.233.245.160.591 Toll Road Concession Rights
Aset Keuangan atas Proyek Konsesi 20 349.578.847.341 381.622.115.538 Financial Assets from Concession Project
Aset Pajak Tangguhan 11 1.219.284.809 1.557.248.071 Deferred Tax Assets
Aset Lain-lain 18 1.312.711.361.094 496.567.814.840 Other Assets
TOTAL ASET TIDAK LANCAR 70.998.720.347.460 57.402.451.801.445 TOTAL NON-CURRENT ASSETS
TOTAL ASET 137.239.960.014.360 124.391.581.623.636 TOTAL ASSETS

Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of
laporan keuangan interim konsolidasian the consolidated interim financial statements

d6/February 5, 2014 1 paraf:


PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARIES
LAPORAN POSISI KEUANGAN CONSOLIDATED INTERIM STATEMENTS OF
INTERIM KONSOLIDASIAN FINANCIAL POSITION
Per 30 September 2019 dan 31 Desember 2018 As of September 30, 2019 and December 31, 2018
(Dalam Rupiah Penuh) (In Full of Rupiah)
Catatan/ 30 September/ 31 Desember/
Notes September 30, 2019 December 31, 2018
Rp Rp
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
LIABILITAS JANGKA PENDEK CURRENT LIABILITIES
Utang Usaha 21 12.912.997.224.235 14.905.832.998.966 Accounts Payable
Utang Bank Jangka Pendek Short-Term Bank Loans
Pihak Berelasi 22, 54 19.294.931.223.555 15.838.981.106.761 Related Parties
Pihak Ketiga 22 16.170.304.061.331 12.120.266.171.454 Third Parties
Utang Lembaga Keuangan Non-Bank Loan to Financial Institution Non-Bank
Bagian Jangka Pendek Short-Term Portion
Pihak Berelasi 23, 54 508.845.493.920 392.616.610.781 Related Parties
Utang Bruto Subkontraktor Jangka Pendek 24 1.752.071.991.068 6.476.521.497.975 Short-Term Gross Amount Due to Subcontractors
Biaya yang Masih Harus Dibayar 26 755.869.338.569 695.785.978.311 Accrued Expenses
Utang Pajak Jangka Pendek 11 3.758.782.664.335 2.028.608.632.641 Short-Term Taxes Payables
Uang Muka Kontrak Jangka Pendek Advances on Short-Term Contract
Pihak Berelasi 25, 54 96.454.399.437 10.080.783.551 Related Parties
Pihak Ketiga 25 195.222.589.204 277.599.246.755 Third Parties
Utang Bank Jangka Panjang Current Maturities of
yang Jatuh Tempo dalam Setahun 30 416.500.000.000 416.500.000.000 Long-Term Bank Loan
Utang Pembelian Aset Tetap Bagian Lancar 32 68.075.729 198.479.272 Debt Purchases of Fixed Assets - Current Portion
Surat Utang Jangka Menengah Jangka Pendek 27 1.050.878.282.542 812.204.218.768 Short-Term Medium Term Notes
Utang Obligasi Jangka Pendek - Bersih 28 747.000.000.000 1.999.290.340.350 Short-Term Bonds Payable - Net
Liabilitas Jangka Pendek Lainnya 29 1.217.875.938.108 825.239.033.758 Other Short-Term Liabilities

TOTAL LIABILITAS JANGKA PENDEK 58.877.801.282.033 56.799.725.099.343 TOTAL CURRENT LIABILITIES


LIABILITAS JANGKA PANJANG NON-CURRENT LIABILITIES
Utang Bank Jangka Panjang Long-Term Bank Loans
Pihak Berelasi 30, 54 16.918.823.660.317 15.157.592.571.768 Related Parties
Pihak Ketiga 30 13.155.048.012.022 5.594.661.305.370 Third Parties
Utang Ventura Bersama Jangka Panjang 31 770.564.755.648 671.607.440.338 Long-Term Joint Venture Payable
Utang Lembaga Keuangan Non Bank Jangka Panjang Long Term Loan to Financial Institution Non Bank
Pihak Ketiga 23 355.412.409.460 161.786.818.242 Third Parties
Utang Bruto Jangka Panjang Long-Term Gross Amount
Pihak Ketiga 24 1.424.477.398.203 2.225.140.670.799 Third Parties
Uang Muka Kontrak Jangka Panjang Advances on Long-Term Contract
Pihak Berelasi 34, 54 4.985.756.856 76.760.975.950 Related Parties
Pihak Ketiga 34 147.263.647.577 186.139.786.284 Third Parties
Liabilitas Pajak Tangguhan 11 92.177.409.072 54.362.636.473 Deferred Tax Liabilities
Utang Pajak Jangka Panjang 11 -- 805.408.693.733 Long-Term Taxes Payable
Utang Lain-lain Jangka Panjang Other Long-Term Payables
Pihak Berelasi 33, 54 825.671.398.210 -- Related Parties
Pihak Ketiga 33 1.600.818.227.144 1.549.134.705.578 Third Parties
Surat Utang Jangka Menengah Jangka Panjang 27 300.000.000.000 300.000.000.000 Long-Term Medium Term Notes
Utang Obligasi Jangka Panjang - Bersih 28 13.445.120.532.349 11.849.363.801.404 Long-Term Bonds Payable - Net
Utang Pembelian Aset Tetap Bagian Debt Purchases of Fixed Assets -
Jangka Panjang 32 360.736 6.226.563 Long-Term Portion
Liabilitas Imbalan Kerja 35 95.201.184.410 72.772.140.924 Employee Benefit Liabilities

TOTAL LIABILITAS JANGKA PANJANG 49.135.564.752.004 38.704.737.773.426 TOTAL NON-CURRENT LIABILITIES

TOTAL LIABILITAS 108.013.366.034.037 95.504.462.872.769 TOTAL LIABILITIES

EKUITAS EQUITY
Modal Saham Share Capital
Modal Saham - Nilai Nominal Rp 100 per Saham pada Share Capital - Rp 100 par Value per Share for
30 September 2019 dan 31 Desember 2018 September 30, 2019 and December 31, 2018 respectively
Modal Dasar - 1 Saham Seri A Dwi Warna dan Authorized Capital - 1 share of Dwi Warna Serie A and
25.999.999.999 Saham Seri B pada 25,999,999,999 Shares of Serie B in
30 September 2019 dan 31 Desember 2018 September 30, 2019 and December 31, 2018 respectively
Modal Ditempatkan dan Disetor Penuh - Subscribed and Fully Paid Capital
1 Saham Seri A Dwi Warna dan 13.573.902.599 1 share of Dwi Warna Serie A and 13,573,902,599
Saham Seri B pada Serie B Shares in
30 September 2019 dan 31 Desember 2018 36 1.357.390.259.999 1.357.390.259.999 September 30, 2019 and December 31, 2018 respectively
Tambahan Modal Disetor 37 5.552.026.262.437 5.552.026.262.437 Additional Paid-in Capital
Saldo Laba 38 Retained Earnings
Telah Ditentukan Penggunaannya 1.672.393.928.212 1.583.494.837.349 Appropriated
Belum Ditentukan Penggunaannya 8.838.449.000.097 8.763.909.422.956 Unappropriated
Komponen Ekuitas Lainnya 739.633.269.559 744.295.282.636 Other Component of Equity
Jumlah Ekuitas yang Dapat Diatribusikan Total Equity Attributable to
Kepada Pemilik Entitas Induk 18.159.892.720.304 18.001.116.065.377 Owners of Parent
Kepentingan Non-Pengendali 46 11.066.701.260.019 10.886.002.685.490 Non-Controlling Interest

JUMLAH EKUITAS 29.226.593.980.323 28.887.118.750.867 TOTAL EQUITY

JUMLAH LIABILITAS DAN EKUITAS 137.239.960.014.360 124.391.581.623.636 TOTAL LIABILITIES AND EQUITY

Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of
laporan keuangan interim konsolidasian the consolidated interim financial statements

d6/February 5, 2014 2 paraf:


PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARIES
LAPORAN LABA RUGI DAN CONSOLIDATED INTERIM STATEMENTS OF
PENGHASILAN KOMPREHENSIF LAIN PROFIT OR LOSS AND
INTERIM KONSOLIDASIAN OTHER COMPREHENSIVE INCOME
Untuk Periode Sembilan Bulan yang Berakhir For the Nine Month Periods Ended
30 September 2019 dan 2018 September 30, 2019 and 2018
(Dalam Rupiah Penuh) (In Full of Rupiah)

Catatan/ 30 September/ September 30,


Notes 2019 2018
Rp Rp

Pendapatan Usaha 39, 55 22.014.896.412.104 36.232.526.253.441 Revenues


Beban Pokok Pendapatan 40 (17.858.607.210.165) (29.158.709.318.441) Cost of Revenues
LABA BRUTO 4.156.289.201.939 7.073.816.935.000 GROSS PROFIT

Beban Penjualan 41 (38.009.723.714) (33.633.376.036) Selling Expenses


Beban Umum dan Administrasi 41 (736.789.674.525) (1.113.523.173.213) General and Administrative Expenses
Beban Pajak Final 11 (478.192.215.198) (1.396.089.938.397) Final Tax Expenses
Pendapatan Bunga 689.146.394.743 1.085.948.314.838 Interest Income
Keuntungan (Kerugian) Selisih Kurs - Bersih (9.341.247.028) 20.516.536.189 Gain (Loss) on Foreign Exchange Rates - Net
Pendapatan Lain - lain 42 376.022.155.899 1.836.167.137.956 Other Income
Beban Lain-lain 43 (61.879.183.447) (274.054.735.105) Other Expenses
LABA SEBELUM BEBAN KEUANGAN, PROFIT BEFORE FINANCIAL CHARGES,
BAGIAN LABA BERSIH EQUITY IN NET INCOME OF
ENTITAS ASOSIASI DAN VENTURA BERSAMA 3.897.245.708.669 7.199.147.701.232 ASSOCIATES AND JOINT VENTURES

Beban Keuangan 44 (2.589.169.641.158) (1.946.914.531.560) Financial Charges


Bagian Laba Bersih Equity in Net Income
Entitas Asosiasi dan Ventura Bersama 45 (6.328.609.082) 34.531.005.438 of Associates and Joint Ventures

LABA SEBELUM PAJAK 1.301.747.458.429 5.286.764.175.110 PROFIT BEFORE TAX

Beban Pajak Penghasilan 11 (198.797.371.194) (773.761.182.684) Income Tax Expenses


LABA PERIODE BERJALAN 1.102.950.087.235 4.513.002.992.426 PROFIT FOR THE PERIOD

PENGHASILAN KOMPREHENSIF LAIN OTHER COMPREHENSIVE INCOME


Pos-pos yang Tidak Akan Items that Will Not Be Reclassified
Direklasifikasi Kemudian ke Laba Rugi Subsequently to Profit and Loss
Pengukuran Kembali Program Remeasurement of Defined
Imbalan Pasti - Bersih 3.817.342.992 20.843.224.094 Benefit Obligations - Net

Pos-pos yang Akan Direklasifikasi Items that Will Be Reclassified


Kemudian ke Laba Rugi Subsequently to Profit and Loss
Selisih Kurs Penjabaran Exchange Difference on Transalation
Laporan Keuangan dari Kegiatan of Financial Statements in
Operasi Luar Negeri (4.662.013.077) 27.517.256.842 Foreign Operational

Penghasilan (Beban) Komprehensif Lain Total Other Comprehensive


Periode Berjalan (844.670.085) 48.360.480.936 Income (Expenses) For The Period
TOTAL LABA KOMPREHENSIF TOTAL COMPREHENSIVE INCOME
PADA PERIODE BERJALAN 1.102.105.417.150 4.561.363.473.362 FOR THE PERIOD

LABA YANG DAPAT DIATRIBUSIKAN KEPADA: PROFIT ATTRIBUTABLE TO:


Pemilik Entitas Induk 1.150.330.832.978 3.745.402.921.873 Owners of the Parent
Kepentingan Non-Pengendali 46 (47.380.745.743) 767.600.070.553 Non-Controlling Interest

LABA PERIODE BERJALAN 1.102.950.087.235 4.513.002.992.426 PROFIT FOR THE PERIOD

JUMLAH LABA KOMPREHENSIF YANG DAPAT TOTAL COMPREHENSIVE INCOME


DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik Entitas Induk 1.149.486.162.893 3.793.763.402.809 Owners of the Parent
Kepentingan Non-Pengendali 46 (47.380.745.743) 767.600.070.553 Non-Controlling Interest

JUMLAH LABA KOMPREHENSIF TOTAL COMPREHENSIVE INCOME


PADA PERIODE BERJALAN 1.102.105.417.150 4.561.363.473.362 FOR THE PERIOD

Laba per saham 47 Earnings per share


Dasar 84,75 275,93 Basic

Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of
laporan keuangan interim konsolidasian the consolidated interim financial statements

d6/February 5, 2014 3 paraf:


PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARIES
LAPORAN PERUBAHAN EKUITAS INTERIM KONSOLIDASIAN CONSOLIDATED INTERIM STATEMENTS OF CHANGES IN EQUITY
Untuk Periode Sembilan Bulan yang Berakhir 30 September 2019 dan 2018 For the Nine Month Periods Ended September 30, 2019 and 2018
(Dalam Rupiah Penuh) (In Full of Rupiah)

Dapat Diatribusikan kepada Pemilik Entitas Induk/ Attributable to the Owners of the Parent
Komponen Ekuitas Lainnya/
Other Component of Equity
Tambahan Modal Saldo laba/ Retained earnings Selisih Penjabaran Kepentingan
Disetor/ Ditentukan Belum Ditentukan Laporan Dalam Surplus Revaluasi/ Non-Pengendali/ Jumlah Ekuitas/
Catatan/ Modal Saham/ Additional Paid-In Penggunaannya/ Penggunaannya/ Jumlah/ Mata Uang Asing/ Revaluation Jumlah/ Non-Controlling Total
Notes Shares Capital Capital Appropriated Unappropriated Total Translation Adjustment Surplus Total Interest Equity
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

SALDO PER 31 DESEMBER 2017 1.357.390.259.999 5.467.018.482.083 920.938.115.937 5.760.142.991.677 6.681.081.107.614 (7.360.512.042) 508.308.951.702 14.006.438.289.356 8.748.386.520.139 22.754.824.809.495 BALANCE AS OF DECEMBER 31, 2017

Cadangan Umum 39 -- -- 662.556.721.412 (662.556.721.412) -- -- -- -- -- -- General Reserves


Opsi Saham 38 -- (568.091.840) -- -- -- -- (568.091.840) -- (568.091.840) Stock Option
Dividen Tunai -- -- -- (776.342.383.468) (776.342.383.468) -- -- (776.342.383.468) -- (776.342.383.468) Cash Dividend
Kepentingan Non-Pengendali 47 -- -- -- -- -- -- -- -- 44.128.386.791 44.128.386.791 Non-Controlling Interest
Laba Periode Berjalan -- -- -- 3.745.402.921.873 3.745.402.921.873 -- -- 3.745.402.921.873 767.600.070.553 4.513.002.992.426 Profit for the Current Period
Penyesuaian atas Perubahan Adjustment for Changes Ownership
Kepemilikan atas Entitas Anak -- 35.575.398.692 -- 452.036.538.835 452.036.538.835 -- (18.350.479.069) 469.261.458.458 -- 469.261.458.458 in Subsidiaries
Pengukuran Kembali Program Imbalan Pasti -- -- -- 20.843.224.094 20.843.224.094 -- -- 20.843.224.094 -- 20.843.224.094 Remeasured of Defined Benefits Plans - Net
Selisih Kurs Penjabaran Laporan Keuangan Exchange Rates Difference on Translation
dari Kegiatan Usaha Luar Negeri -- -- -- -- -- 27.517.256.842 -- 27.517.256.842 -- 27.517.256.842 of Financial Statements in Foreign Operations

SALDO PER 30 SEPTEMBER 2018 1.357.390.259.999 5.502.025.788.935 1.583.494.837.349 8.539.526.571.599 10.123.021.408.948 20.156.744.800 489.958.472.633 17.492.552.675.315 9.560.114.977.483 27.052.667.652.798 BALANCE AS OF SEPTEMBER 30, 2018

SALDO PER 31 DESEMBER 2018 1.357.390.259.999 5.552.026.262.437 1.583.494.837.349 8.763.909.422.956 10.347.404.260.305 11.388.092.112 732.907.190.524 18.001.116.065.377 10.886.002.685.490 28.887.118.750.867 BALANCE AS OF DECEMBER 31, 2018

Cadangan Umum 39 -- -- 88.899.090.863 (88.899.090.863) -- -- -- -- -- -- General Reserves


Dividen Tunai -- -- -- (990.709.507.966) (990.709.507.966) -- -- (990.709.507.966) -- (990.709.507.966) Cash Dividend
Kepentingan Non-Pengendali 47 -- -- -- -- -- -- -- -- 228.079.320.272 228.079.320.272 Non-Controlling Interest
Laba Periode Berjalan -- -- -- 1.150.330.832.978 1.150.330.832.978 -- -- 1.150.330.832.978 (47.380.745.743) 1.102.950.087.235 Profit for the Current Period
Pengukuran Kembali Program Imbalan Pasti Remeasurement of Defined
Bersih -- -- -- 3.817.342.992 3.817.342.992 -- -- 3.817.342.992 -- 3.817.342.992 Benefits Plans - Net
Selisih Kurs Penjabaran Laporan Keuangan Exchange Rates Difference on translation
dari Kegiatan Usaha Luar Negeri -- -- -- -- -- (4.662.013.077) -- (4.662.013.077) -- (4.662.013.077) of Financial Statements in Foreign Operations
SALDO PER 30 SEPTEMBER 2019 1.357.390.259.999 5.552.026.262.437 1.672.393.928.212 8.838.449.000.097 10.510.842.928.309 6.726.079.035 732.907.190.524 18.159.892.720.304 11.066.701.260.019 29.226.593.980.323 BALANCE AS OF SEPTEMBER 30, 2019

Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of
laporan keuangan interim konsolidasian the consolidated interim financial statements
d6/February 5, 2014 4 paraf:
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARIES
LAPORAN ARUS KAS CONSOLIDATED INTERIM STATEMENTS
INTERIM KONSOLIDASIAN OF CASH FLOWS
Untuk Periode Sembilan Bulan yang Berakhir For the Nine Month Periods Ended
30 September 2019 dan 2018 September 30, 2019 and 2018
(Dalam Rupiah Penuh) (In Full of Rupiah)

30 September/ September 30,


2019 2018
Rp Rp
ARUS KAS DARI AKTIVITAS OPERASI CASH FLOWS FROM OPERATING ACTIVITIES

Penerimaan Kas dari Pelanggan 29.747.380.652.352 28.030.493.030.662 Cash Receipts from Customers
Pengeluaran Kas kepada Pemasok (31.009.807.869.739) (26.869.889.831.946) Cash Paid to Suppliers
Pengeluaran Kas kepada Karyawan dan Direksi (414.939.665.659) (897.627.457.421) Cash Paid to Employees and Directors

Kas Dihasilkan dari Operasi (1.677.366.883.046) 262.975.741.296 Cash Generated from Operations
Penerimaan Rekening Giro dan Interest Income from Current Account and
Deposito Berjangka 699.074.678.055 1.967.671.981.346 Time Deposit
Pembayaran Beban Keuangan (2.589.169.641.158) (1.811.842.214.645) Payment for Financial Charges
Penerimaan Restitusi Pajak 314.435.395.994 -- Receipt from Tax Restitutions
Pembayaran Pajak (1.622.777.854.298) (1.964.360.527.833) Payment for Taxes

Kas Bersih Diperoleh dari Net Cash Provided by


(Digunakan untuk) Aktivitas Operasi (4.875.804.304.453) (1.545.555.019.836) (Used in) Operating Activities

ARUS KAS DARI AKTIVITAS INVESTASI CASH FLOWS FROM INVESTING ACTIVITIES

Penerimaan dari Ventura Bersama 522.627.859.275 3.019.396.121.872 Receipt from Joint Ventures
Penempatan pada Ventura Bersama (1.696.055.390.141) (3.489.231.653.907) Placement of Joint Ventures
Penempatan Deposito (107.500.000.000) (3.257.820.977.046) Placement of Time Deposits
Penerimaan Pencairan Deposito 3.218.230.908.849 2.394.539.513.690 Receipt from Time Deposits
Penerimaan Dividen dari Entitias Anak -- 484.030.710.810 Receipt Dividend from Subsidiaries
Perolehan Aset Tetap (1.887.926.305.710) (1.793.925.235.490) Acquisition of Fixed Assets
Penambahan Penyertaan Entitas Anak Acquisition of Subsidiaries
Penambahan Properti Investasi -- (8.305.974.939) Addition of Investment Properties
Perolehan Aset Tak Berwujud (12.313.115.769.759) (12.018.027.126.350) Acquisition of Intangible Assets
Penempatan Investasi Jangka Pendek -- (1.000.000.000.000) Placement of Short-Term Investments
Penempatan Investasi pada Entitas Asosiasi Placement of Investment In Associates and
dan Jangka Panjang Lainnya (1.202.443.504.130) (1.003.917.800.000) and Long-Term Investments
Penerimaan atas Pelepasan Penyertaan Pada Entitas Anak Receipt from Disposal of Investment In Subsidiaries
dan Entitas Asosiasi -- 1.830.808.812.006 and Associates
Pinjaman Diberikan kepada Entitas Asosiasi (2.188.900.868) 218.408.060.259 Loans to Associates
Pengurangan Penyertaan pada Entitas Anak Reduction of Investment in Subsidiaries
dan Entitas Asosiasi -- (129.713.990.966) and Associates

Kas Bersih Digunakan untuk Aktivitas Investasi (13.468.371.102.484) (14.753.759.540.061) Net Cash Used in Investing Activities

ARUS KAS DARI AKTIVITAS PENDANAAN CASH FLOWS FROM FINANCING ACTIVITIES

Pelunasan Utang Obligasi (2.000.000.000.000) -- Payment of Bonds Payable


Pembayaran Emisi Obligasi (23.809.585.700) (3.750.476.438) Bonds Issuance Costs
Penerimaan Penerbitan Obligasi 2.341.795.843.747 5.154.250.000.000 Receipt from Bonds Issuance
Penerimaan Pinjaman Bank 80.404.597.166.057 57.111.108.326.305 Receipt from Bank Loans
Pembayaran Pinjaman Bank (69.710.447.492.279) (44.140.697.120.765) Payment of Bank Loans
Pembayaran Dividen Tunai (794.449.156.029) (776.342.383.467) Payment of Cash Dividend
Penerimaan Pinjaman Lembaga Keuangan Non-Bank 309.854.474.357 707.622.157.150 Receipt from Financial Institution Non Bank
Pembayaran Pinjaman Lembaga Keuangan Non-Bank -- (1.102.495.571.295) Payment to Financial Institution Non Bank
Penerimaan Surat Utang Jangka Menengah 749.711.893.798 -- Receipt from Medium Term Notes
Pembayaran Surat Utang Jangka Menengah (500.852.934.774) -- Payment to Medium Term Notes
Penerimaan Setoran dari Entitas Receipt from
Non-Pengendali 228.079.320.272 44.128.386.791 Non-controlling Interest

Kas Bersih Diperoleh dari Aktivitas Pendanaan 11.004.479.529.449 16.993.823.318.282 Net Cash Provided by Financing Activities

KENAIKAN (PENURUNAN) BERSIH KAS DAN NET INCREASE (DECREASE) IN CASH AND
SETARA KAS (7.339.695.877.488) 694.508.758.384 CASH EQUIVALENTS

KEUNTUNGAN SELISIH KURS YANG UNREALIZED GAIN ON


BELUM DIREALISASI (9.928.283.312) (18.442.203.152) FOREIGN EXCHANGE RATE

KAS DAN SETARA KAS CASH AND CASH EQUIVALENTS


PADA AWAL PERIODE 10.845.678.217.202 6.088.962.586.747 AT THE BEGINNING OF PERIOD

KAS DAN SETARA KAS CASH AND CASH EQUIVALENTS


PADA AKHIR PERIODE 3.496.054.056.402 6.765.029.141.979 AT THE END OF PERIOD

Rekonsiliasi liabilitas yang timbul dari aktivitas pendanaan Reconciliation of liabilities arising from financing activities
(Catatan 50) (Note 50)
Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of
laporan Keuangan interim konsolidasian the consolidated interim financial statements
d6/February 5, 2014 5 paraf:
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
 
1. UMUM 1. GENERAL
 
1.a. Pendirian dan Informasi Umum   1.a. Establishment and General Information
 
Perusahaan  Negara  Waskita  Karya    The  State  Owned  Company  Waskita  Karya  
(“Perusahaan”) didirikan pada tanggal 1 Januari  (“the Company”) was established on January 1, 
1961 berdasarkan Peraturan Pemerintah No. 62  1961  based  on  Government  Regulation  No.  62 
tahun  1961,  dari  Perusahaan  asing  bernama  year  1961,  from  a  foreign  company  named 
"Volker  Aanemings  Maatschappij  NV"  yang  "Volker  Aanemings  Maatschappij  NV"  which 
dinasionalisasi  Pemerintah  Republik  Indonesia.  was  nationalized  by  the  Government  of             
Perusahaan  memulai  kegiatan  usaha  the Republic of Indonesia. The Company started 
komersialnya pada tanggal 1 Januari 1961.  its commercial operations on January 1, 1961. 
     
Berdasarkan  Peraturan  Pemerintah  No.  40    According  to  Government  Regulation  No.  40 
tahun  1970  status  Perusahaan  berubah  dari  year  1970,  the  Company’s  status  was  changed 
Perusahaan  Negara  (PN)  menjadi  Perseroan  from  State  Enterprise into  Perseroan  (Persero). 
(Persero).  Selanjutnya,  Perusahaan  dinamakan  Furthermore,  the  Company  was  named  as 
PT  Waskita  Karya  (Persero)  berdasarkan  Akta  PT Waskita Karya (Persero)  in accordance with 
Perseroan  Terbatas  No.  80  tanggal  15  Maret  the Deed of Limited Liability Corporation No. 80 
1973,  yang  dibuat  di  hadapan  Kartini  Mulyadi,  dated  March  15,  1973  of  Kartini  Mulyadi,  S.H., 
S.H.,  Notaris  di  Jakarta.  Akta  Perseroan  Notary  in  Jakarta.  The  deed  was  approved  by 
Terbatas  tersebut  telah  disahkan  oleh  Menteri  the  Minister  of  Law  on  August  20,  1973  in  his 
Kehakiman  pada  tanggal  20 Agustus  1973  Decree  No.  4.a.5/3/310/3  and  stated  on  State 
dengan  Surat  Keputusan  No. 4.a.5/310/3  serta  Gazette  of  Republic  of  Indonesia  No. 82  on 
diumumkan  dalam  Berita  Negara  Republik  November 13, 1973, Supplement No. 91. 
Indonesia  No.  82  tanggal  13 Nopember  1973, 
Tambahan Berita Negara No. 91. 
     
Anggaran  Dasar  Perusahaan  telah  beberapa    The Company's Articles of Association has been 
kali mengalami perubahan, terakhir berdasarkan  amended  for  several  times,  most  recently  by  
akta  notaris  No.  137  tanggal  27  Mei  2019   the  notarial  deed  No.  137  on  May  27,  2019  of 
dari  notaris  Ashoya  Ratam,  S.H.,  M.Kn.,  yang  notary  Ashoya  Ratam,  S.H.,  M.Kn.,  which  has 
telah  disetujui  oleh  Menteri  Hukum  dan  Hak  been  approved  by  the  Minister  of  Law  and  
Asasi  Manusia  dengan  Surat  Keputusan   Human  Rights  in  his  Decision  Letter  
No.  AHU-0033169.AH.01.02.Tahun  2019  No.  AHU-0033169.AH.01.02.Tahun  2019  dated 
tanggal  26  Juni  2019.  Perubahan  yang  June 26, 2019. The changes referred to include, 
dimaksud  antara  lain  terkait  perubahan  among  others,  changes  in  the  provisions  of 
ketentuan Pasal 3 Anggaran Dasar Perusahaan.  Article  3  of  the  Company's  Articles  of 
Association. 
     
Perusahaan  berkedudukan  di  Jakarta,  dengan    The  Company  is  domiciled  in  Jakarta,  with  
kantor  pusat  beralamat  di  Jl.  MT  Haryono  Kav.  the  head  office  located  at  Jl.  MT  Haryono  Kav. 
No. 10 Cawang, Jakarta 13340.  No. 10 Cawang, Jakarta 13340. 
     
1.b. Entitas Anak   1.b. Subsidiaries
     
Perusahaan memiliki kepemilikan langsung dan    The  Company  has  50%  direct  and  indirect 
tidak  langsung  lebih  dari  50%  saham  pada  ownership  interest  in  subsidiaries  and/  or  has 
entitas anak dan/  atau mempunyai kendali  atas  control  over  consolidated  subsidiaries 
manajemen  entitas  anak  yang  dikonsolidasi  management as follows:
sebagai berikut: 
     
a.  Kepemilikan Langsung/ Direct Ownership     
 
Sebelum Eliminasi/ Before Elimination
Persentase 30 September/ September 30 , 2019
Kepemilikan/ Jumlah Laba
Percentage (Rugi) Bersih
of Periode Berjalan/
Entitas Anak/ Domisili/ Jenis Usaha/ Tahun Operasi Komersial/ Ownerships Jumlah Aset/ Total Profit (Loss)
Subsidiaries Domiciled Nature of Business Start of Commercial Operations % Total Assets for the Period
Rp Rp
PT Waskita Toll Road Jakarta Jalan Tol/ Toll Road 2014 79,88        69.632.170.864.997  (612.743.353.019)
PT Waskita Beton Precast Tbk Jakarta Industri Pabrikasi/ 2014 59,99        15.580.328.109.885              511.734.007.419 
Fabrication
PT Waskita Karya Realty Jakarta Properti/ Property 2015 99,99          4.761.683.003.402                74.346.404.337 
PT Waskita Karya Infrastruktur (dh/ 
formerly  PT Waskita Karya Energi) Jakarta Investasi/ Investment 2016 99,99             537.255.956.700  (8.926.615.728)
 

6
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Sebelum Eliminasi/ Before Elimination
Persentase 31 Desember/ December 31 , 2018
Kepemilikan/ Jumlah Laba
Percentage (Rugi) Bersih
of Tahun Berjalan/
Entitas Anak/ Domisili/ Jenis Usaha/ Tahun Operasi Komersial/ Ownerships Jumlah Aset/ Total Profit (Loss)
Subsidiaries Domiciled Nature of Business Start of Commercial Operations % Total Assets for the Year
Rp Rp
PT Waskita Toll Road Jakarta Jalan Tol/ Toll Road 2014 79,88 57.262.108.475.134  957.458.418.294 
PT Waskita Beton Precast Tbk Jakarta Industri Pabrikasi/ 2014 59,99 15.222.388.589.814  1.103.472.788.182 
Fabrication
PT Waskita Karya Realty Jakarta Properti/ Property 2015 99,99 4.290.092.896.122  168.462.426.431 
PT Waskita Karya Energi Jakarta Investasi/ Investment 2016 99,99 397.152.131.423  (23.188.344.439)
 
b.  Kepemilikan Tidak Langsung/ Indirect Ownership 
 
Sebelum Eliminasi/ Before Elimination
Persentase 30 September/ September 30 , 2019
Kepemilikan/ Jumlah Laba
Percentage (Rugi) Bersih
of Periode Berjalan/
Entitas Anak/ Domisili/ Jenis Usaha/ Tahun Operasi Komersial/ Ownerships Jumlah Aset/ Total Profit (Loss)
Subsidiaries Domiciled Nature of Business Start of Commercial Operations % Total Assets for the Period
Rp Rp
PT Waskita Sangir Energi Jakarta Energi/ Energy 2016 94,70 383.574.885.540  9.866.789.966 
PT Waskita Wado Energi Jakarta Energi/ Energy Dalam Tahap Pengembangan/  99,99 18.055.491.608  (3.937.806.466)
Development Stage
PT Cimanggis Cibitung Tollways Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/  90,00 7.881.472.633.097  1.149.954.952 
Development Stage
PT Trans Jabar Tol Jakarta Jalan Tol/ Toll Road Pebruari/ February 2019 99,99 5.551.009.872.462  (163.903.949.691)
PT Pemalang Batang Toll Road Jakarta Jalan Tol/ Toll Road Nopember/ November 2018  60,00 7.664.107.729.162  (242.676.321.085)

PT Waskita Sriwijaya Tol (dh/ formerly  Dalam Tahap Pengembangan/ 
Jakarta Jalan Tol/ Toll Road 98,18 10.565.702.344.976  711.968.701 
PT Sriwijaya Markmore Persada) Development Stage

PT Waskita Bumi Wira Gresik Jalan Tol/ Toll Road Dalam Tahap Pengembangan/  99,90 10.653.163.856.627  2.527.776.178 


Development Stage
PT Cibitung Tanjung Priok Port  Jakarta  Jalan Tol/ Toll Road Dalam Tahap Pengembangan/  55,00 7.301.585.209.150  2.951.924.446 
Tollways Development Stage

PT Kresna Kusuma Dyandra Marga  Jakarta  Jalan Tol/ Toll Road Desember/ December  2017 99,70 8.537.432.354.110  (312.988.124.735)

Dalam Tahap Pengembangan/ 
PT Tol Teluk Balikpapan Balikpapan Jalan Tol/ Toll Road 80,00 18.188.271.468  210.031.874 
Development Stage
PT Waskita Fim Perkasa Realti 
Jakarta Properti/ Property 2018 60,00             518.531.435.041  16.851.198.219 
(WFPR)
PT Waskita Modern Realty (WMR) Jakarta Properti/ Property 2018 60,00 401.249.712.001  (492.549.381)
 
Sebelum Eliminasi/ Before Elimination
Persentase 31 Desember/ December 31 , 2018
Kepemilikan/ Jumlah Laba
Percentage (Rugi) Bersih
of Tahun Berjalan/
Entitas Anak/ Domisili/ Jenis Usaha/ Tahun Operasi Komersial/ Ownerships Jumlah Aset/ Total Profit (Loss)
Subsidiaries Domiciled Nature of Business Start of Commercial Operations % Total Assets for the Year
Rp Rp
PT Waskita Sangir Energi Jakarta Energi/ Energy 2016 94,70 374.632.256.444  (6.895.888.971)
PT Waskita Wado Energi Jakarta Energi/ Energy Dalam Tahap Pengembangan/  99,99 13.636.736.210  (5.565.819.048)
Development Stage
PT Cimanggis Cibitung Tollways Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/  90,00 5.928.060.765.087  1.876.580.397 
Development Stage
PT Trans Jabar Tol Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/  99,99 5.436.936.696.537  7.560.408.553 
Development Stage
PT Pemalang Batang Toll Road Jakarta Jalan Tol/ Toll Road November/ November 2018  60,00 7.689.541.259.403  (8.913.171.618)
PT Sriwijaya Markmore Persada Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/  98,18 8.271.557.566.264  2.469.228.764 
Development Stage
PT Waskita Bumi Wira Gresik Jalan Tol/ Toll Road Dalam Tahap Pengembangan/  99,90 8.557.702.147.304  888.522.992 
Development Stage
PT Cibitung Tanjung Priok Port  Jakarta  Jalan Tol/ Toll Road Dalam Tahap Pengembangan/  55,00 4.217.355.404.456  6.370.767.223 
Tollways Development Stage
PT Kresna Kusuma Dyandra Marga  Jakarta  Jalan Tol/ Toll Road Desember/ December  2017 99,70 6.973.010.047.504  (352.826.567.704)
PT Tol Teluk Balikpapan Balikpapan Jalan Tol/ Toll Road Dalam Tahap Pengembangan/  80,00 26.155.671.621  467.059.194 
Development Stage
PT Waskita Fim Perkasa Realti  Jakarta Properti/ Property 2018 60,00             136.406.866.995  (596.753.442)
(WFPR)
PT Waskita Modern Realty (WMR) Jakarta Properti/ Property 2018 60,00 401.667.169.202  184.676.343 
 
 
 
 

7
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
PT Waskita Toll Road (WTR)    PT Waskita Toll Road (WTR) 
     
Pendirian WTR (entitas anak) adalah sesuai    The establishment of WTR (subsidiary) was 
dengan  akta  notaris  No.  62  tanggal  19  Juni  based  on  notarial  deed  No.  62  dated  June 
2014  dari  notaris  Fathiah  Helmi,  S.H.  Akta  19,  2014  of  notary  Fathiah  Helmi,  S.H.   
pendirian  ini  telah  mendapat  persetujuan  The  deed  was  approved  by  the  Minister  of 
oleh Menteri Hukum dan Hak Asasi Manusia  Law and Human Rights through its decision 
melalui  surat  keputusan  No. AHU-14734.  letter  No. AHU-14734.40.10.2014  dated 
40.10.2014  tanggal  25 Juni  2014.  Anggaran  June  25,  2014.  The  Company's  Articles  of 
Dasar  Perusahaan  telah  beberapa  kali  Association  has  been amended  for  several 
mengalami perubahan, terakhir berdasarkan  times,  most  recently  by  the  notarial  deed 
akta  notaris  No.  46  tanggal  21  Desember  No.  46  on  December  21,  2017  of  notary 
2017 dari notaris Ashoya Ratam, S.H., M.Kn  Ashoya  Ratam,  S.H.,  M.Kn  which  has  
yang telah disetujui oleh Menteri Hukum dan  been  approved  by  the  Minister  of  Law  
Hak  Asasi  Manusia  dengan  Surat  and  Human  Rights  in  the  Decision  Letter  
Keputusan  No.  AHU-AH.01.03-0207450  No.  AHU-AH.01.03-0207450  Year  2017 
Tahun 2017 tanggal 29 Desember 2017.   dated December 29, 2017. 
     
Anggaran  Dasar  Perusahaan  telah    The Company's Articles of Association have 
beberapa  kali  mengalami  perubahan,  been amended several times, most recently 
terakhir  berdasarkan  Akta  Notaris  No.  11  based  on  Notarial  Deed  No.  11  dated 
tanggal  6  Agustus  2019  yang  dibuat  August  6,  2019  of  Ashoya  Ratam,  S.H., 
dihadapan  Ashoya  Ratam,  S.H.,  M.Kn.,  M.Kn.,  Notary  in  Jakarta.  This  amendment 
Notaris  di  Jakarta.  Perubahan  ini  telah  has  been  approved  by  the  Minister  of  Law 
disetujui oleh Menteri Hukum dan Hak Asasi   and  Human  Rights  in  his  Decision  Letter  
Manusia  dengan  Surat  Keputusan   No.  AHU-AH.01.03-0311632  dated  August 
No.  AHU-AH.01.03-0311632  tanggal   9,  2019.  The  changes  referred  to  include, 
9 Agustus 2019. Perubahan yang  dimaksud  among others, changes in the provisions of 
antara  lain  terkait  perubahan  Pasal  13  ayat  Article  13  paragraph  1  letter  c,  letter  d 
1 huruf c, huruf d romawi ii, huruf f dan huruf  roman ii, letter f and letter h roman i. 
h romawi i. 
   
PT Waskita Beton Precast Tbk (WBP)  PT Waskita Beton Precast Tbk (WBP) 
     
Pendirian WBP (entitas anak) adalah sesuai    The establishment of WBP (subsidiary) was 
dengan  akta  notaris  No.  10  tanggal  based  on  notarial  deed  No.  10  dated 
7 Oktober  2014  dari  notaris  Fathiah  October  7,  2014  of  notary  Fathiah  
Helmi, S.H.  Akta  pendirian  ini  telah  Helmi,  S.H.  The  deed  was  approved  by  
mendapat  persetujuan  oleh  Menteri  Hukum  the  Minister  of  Law  and  Human  
dan  Hak  Asasi  Manusia  melalui  surat  Rights through the decision letter No. AHU-
keputusan  No.  AHU-29347.40.10.2014  29347.40.10.2014 dated October 14,  2014. 
tanggal  14 Oktober  2014.  Anggaran  Dasar  The  Company's  Articles  of  Association  has 
Perusahaan  telah  beberapa  kali  mengalami  been  amended  for  several  times,  most 
perubahan,  terakhir  berdasarkan  Akta  recently  by  the  Notarial  deed  No.  47  on 
notaris  No.  47  tanggal  24  April  2019  dari  April  24,  2019  of  notary  Fathiah  Helmi, 
notaris  Fathiah  Helmi  S.H.,  yang  telah  S.H.,  which  has  been  approved  by  
disetujui oleh Menteri Hukum dan Hak Asasi  the  Minister  of  Law  and  Human  Rights  in 
Manusia dengan Surat Keputusan No. AHU- the  decision  letter  No.  AHU-AH.01.03-
AH.01.03-0279668 tanggal 24 Mei 2019.  0279668 dated May 24, 2019.       
 
PT Waskita Karya Realty (WKR)  PT Waskita Karya Realty (WKR) 
     
Pendirian WKR (entitas anak) adalah sesuai  The establishment of WKR (subsidiary) was 
dengan  akta  notaris  No.  27  tanggal  based  on  notarial  deed  No.  27  dated 
16 Oktober 2014 dari  notaris Fathiah Helmi,  October  16,  2014  of  notary  Fathiah  Helmi, 
S.H.  Akta  pendirian  ini  telah  mendapat  S.H.  The  deed  was  approved  by  
persetujuan  oleh  Menteri  Hukum  dan  Hak  the  Minister  of  Law  and  Human  Rights 
Asasi  Manusia  melalui  surat  keputusan    through the decision letter No. AHU-54929. 
No.  AHU-54929.AH.01.02,  tanggal  AH.01.02  dated  October  23,  2014.      
23 Oktober  2014.  Anggaran  Dasar  The  Company's  Articles  of  Association  has 
Perusahaan  telah  mengalami  beberapa  kali  been  amended  for  several  times,  most 
perubahan,  terakhir  dengan  akta  notaris   recently  by  the  notarial  deed  No.  15  on 
No.  15  tanggal  28  Januari  2019  dari  Dewi  January  28,  2019  of  notary  Dewi  Tenty 

8
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Tenty Septi Artiany, S.H., M.H., M.Kn., yang  Septi Artiany, S.H., M.H., M.Kn., which has 
telah  disetujui  oleh  Menteri  Hukum   been  approved  by  the  Minister  of  Law  
dan  Hak  Asasi  Manusia  dengan  surat  and  Human  Rights  in  the  decision  letter  
keputusan  No.  AHU-AH.01.03-0067693  No.  AHU-AH.01.03-0067693  dated 
tanggal 4 Pebruari 2019.   February 4, 2019. 
     
PT Waskita Karya Infrastruktur (WKI)   PT  Waskita  Karya  Infrastruktur  (WKI) 
(dh PT Waskita Karya Energi (WKE))  (formerly PT Waskita Karya Energi (WKE)) 
     
Pendirian WKE (entitas anak) adalah sesuai    The establishment of WKE (subsidiary) was 
dengan akta  notaris No. 05 tanggal 4 Maret  based  on  notarial  deed  No.  05              
2016  dari  notaris  Fathiah  Helmi  S.H.  Akta  dated  March 4,  2016  of  notary  Fathiah 
pendirian  ini  telah  mendapat  persetujuan  Helmi,  S.H.  The  deed  was  approved          
oleh Menteri Hukum dan Hak Asasi Manusia  by  the  Minister  of  Law  and  Human               
melalui  surat  keputusan  No. AHU-0019486.  Rights  through  the  decision  letter                 
AH.01.01.Tahun  2016.  Anggaran  Dasar  No.  AHU-0019486.AH.01.01.Tahun  2016.         
Perusahaan  telah  beberapa  kali  mengalami  The  Company's  Articles  of  Association  has 
perubahan,  terakhir  berdasarkan  akta  been  amended  for  several  times,  most 
notaris  No.  108  tanggal  26  Pebruari  2019  recently  by  the  notarial  deed  No.  108  on 
dari  Jose  Dima  Satria,  SH.,  M.Kn.,  yang  February  26,  2019  of  notary  Jose  Dima 
telah disetujui oleh Menteri Hukum dan Hak  Satria,  S.H.,  M.Kn.,  which  has  been 
Asasi  Manusia  dengan  surat  keputusan   approved  by  the  Minister  of  Law  and 
No.  AHU-AH.01.03-0117125  tanggal  Human  Rights  in  the  decision  letter  
26 Pebruari 2019. Nama Perseroan berubah  No.  AHU-AH.01.03-0117125  dated 
menjadi PT Wakita Karya Infrastruktur (WKI)  February  26,  2019.  The  Company's  Name 
berdasarkan  akta  notaris  No.  109   change  to  PT  Waskita  Karya  Infrastruktur 
tanggal  26  Pebruari  2019  dari  Jose   (WKI)  based  on  notarial  deed  No.  109  on 
Dima  Satria,  SH.,  M.Kn.,  dan  telah  disetujui  February  26,  2019  of  notary  Jose  Dima 
oleh  Menteri  Hukum  dan  Hak  Asasi   Satria,  S.H.,  M.Kn.,  which  has  been 
Manusia  dengan  surat  keputusan   approved  by  the  Minister  of  Law  and 
No.  AHU-0010491.AH.01.02.Tahun  2019  Human  Rights  in  the  decision  letter  
tanggal 26 Pebruari 2019.  No.  AHU-0010491.AH.01.02  Tahun  2019 
dated February 26, 2019. 
     
PT Waskita Sangir Energi (WSE)    PT Waskita Sangir Energi (WSE) 
     
Pendirian WSE  (kepemilikan  tidak  langsung    The  establishment  of  WSE  (indirect 
melalui  WKE)  adalah  sesuai  dengan   ownership  through  WKE)  was  based  on  
akta  notaris  No.  22  tanggal  11 Juli  2013   the  notarial  deed  No.  22  dated  July 11, 
dari  notaris  Fathiah  Helmi,  S.H.  Akta  2013  of  notary  Fathiah  Helmi,  S.H.                
pendirian  ini  telah  mendapat  persetujuan  The  deed  was  approved  by  the  Minister  of 
oleh  Menteri  Hukum  dan  Hak  Asasi   Law and Human Rights through its decision 
Manusia  melalui  surat  keputusan   letter  No. AHU-40852.AH.01.01.Tahun 
No. AHU-40852.AH.01.01.Tahun 2013.  2013. 
     
Selanjutnya  pengalihan  kepemilikan    Then transfer of ownership of WSE to WKE 
(inbreng)  WSE  ke  dalam  WKE  dilakukan  was  based  on  the  notarial  deed  No.  21 
berdasarkan  dengan  akta  notaris  No.  21  dated December 23, 2016 of Kokoh Henry, 
tanggal  23 Desember  2016  dari  notaris  S.H.,  M.Kn.  The  Company's  Articles  of 
Kokoh  Henry,  S.H.,  M.Kn.  Anggaran  Dasar  Association  has  been  amended  for  several 
Perusahaan  telah  beberapa  kali  mengalami  times,  most  recently  by  the  notarial  deed 
perubahan,  terakhir  berdasarkan  akta  No.  15  on  December  21,  2017  of  notary 
notaris  No.  15  tanggal  21  Desember  2017  Kokoh  Henry,  S.H.,  M.KN  which  has  been 
dari  notaris  Kokoh  Henry,  S.H.,  M.KN  yang  approved  by  the  Minister  of  Law  and 
telah disetujui oleh Menteri Hukum dan Hak  Human  Rights  in  his  decision  letter  
Asasi  Manusia  dengan  surat  keputusan   No.  AHU-AH.01.03-0204677  dated 
No.  AHU-AH.01.03-0204677  tanggal   December 22, 2017. 
22 Desember 2017. 
     
Perubahan  Direksi  dan  Komisaris  terakhir    Changes  in  the  last  Directors  and 
berdasarkan  akta  notaris  No.  57  tanggal   Commissioners  by  the  notarial  deed  
10  September  2019  dari  notaris  Jose   No.  57  on  September  10,  2019  of  notary 
Dima  Satria,  S.H.,  M.Kn.,  yang  telah   Jose  Dima  Satria,  S.H.,  M.Kn  which  has 

9
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
disetujui  oleh  Menteri  Hukum  dan  Hak   been  approved  by  the  Minister  of  Law  
Asasi  Manusia  dengan  Surat  Keputusan   and  Human  Rights  in  the  Decision  
No.  AHU-AH.01.03-0329546  tanggal   Letter  No.  AHU-AH.01.03-0329546  dated 
11 September 2019.  September 11, 2019. 
     
PT Waskita Wado Energi (WWE)    PT Waskita Wado Energi (WWE) 
     
Pendirian WWE (kepemilikan tidak langsung  The  establishment  of  WWE  (indirect 
melalui  WKE)  adalah  sesuai  dengan  akta  ownership  through  WKE)  was  based  on      
notaris  No.15  tanggal  19  Desember  2016  the  notarial  deed  No.  15  dated 
dari notaris Kokoh Henry, S.H., M.KN. Pada  December 19, 2016 of notary Kokoh Henry, 
bulan  Desember  2016,  WKE  mendirikan  S.H.,  M.KN.  In  December  2016,  WKE 
entitas  anak  baru,  WWE,  dengan  established  a  new  subsidiary,  WWE,  with 
kepemilikan  saham  sebesar  99,96%  saham  99.96%  ownership  and  the  remaining 
dan sisanya dimiliki oleh Koperasi Waskita.   shares owned by Koperasi Waskita. 
     
Berdasarkan akta No. 2 tanggal 6 Desember    Based  on  the  deed  No.  2  dated  December 
2018  yang  dibuat  dihadapan  Notaris  Yusdin  6,  2018  by  notary  Yusdin  Fahim,  S.H., 
Fahim,  S.H.,  kepemilikan  Perusahaan  di  the  ownership  of  the  Company  in  WWE 
WWE  berubah  menjadi  Rp  9.516.000.000  increased to Rp 9,516,000,000 which raised 
sehingga  penyertaan  Perusahaan  meningkat  the Company ownership to 99.99%. 
menjadi 99,99%. 
     
Anggaran  Dasar  Perusahaan  telah     The  Company's  Articles  of  Association  has 
beberapa  kali  mengalami  perubahan,  been  amended  for  several  times,  most 
terakhir  berdasarkan  Akta  notaris  No.  142  recently  by  the  notarial  deed  No.  142  on 
tanggal  22  Juli  2019  dari  notaris  Jose   July  22,  2019  of  notary  Jose  Dima  Satria, 
Dima  Satria,  S.H.,  M.Kn.,  yang  telah  S.H.,  M.Kn.,  which  has  been  approved  by           
disetujui  oleh  Menteri  Hukum  dan  Hak   the  Minister  of  Law  and  Human  Rights  in 
Asasi  Manusia  dengan  Surat  Keputusan   the  Decision  Letter  No.  AHU-
No.  AHU-0044534.AH.01.02.Tahun  2019  0044534.AH.01.02  Tahun  2019  dated  July 
tanggal  31  Juli  2019.  Perubahan  yang  31,  2019.  The changes  referred  to  include, 
dimaksud  antara  lain  terkait  perubahan  among others, changes in the provisions of 
Pasal 4 ayat 1 dan 2.  Article 4 paragraph 1 and 2.. 
     
PT Cimanggis Cibitung Tollways (CCT)    PT Cimanggis Cibitung Tollways (CCT) 
     
Pendirian  CCT  (kepemilikan  tidak  langsung  The  establishment  of  CCT  (indirect 
melalui  WTR)  adalah  sesuai  dengan  akta  ownership  through  WTR)  was  based  on 
notaris No. 52 tanggal 22 Pebruari 2008 dari  notarial  deed  No. 52  dated  February  22, 
notaris  Agus  Madjid,  S.H.  M.Kn.   2008  of  notary  Agus  Madjid,  S.H.  M.Kn. 
Akta  pendirian  ini  telah  mendapat  The  deed  was  approved  by  the  Minister  of 
persetujuan  oleh  Menteri  Hukum  dan  Hak  Law  and  Human  Rights  through  decision 
Asasi  Manusia  melalui  surat  keputusan   letter  No. AHU-09738.AH.  01.01.TH.2008 
No.  AHU-09738.AH.01.01.TH.  2008  tanggal  dated February 27, 2008.  
27 Pebruari 2008.  
     
Selanjutnya,  peralihan  pemegang  saham    Furthermore,  the  change  in  ownership  of 
CCT  kepada  WTR  dilakukan  berdasarkan  CCT  to  WTR  was  based  on  notarial  deed 
dengan  akta  notaris  No.  30  tanggal  13 Juli  No.  30  dated  July 13,  2015  of  notary  Jose 
2015  dari  notaris  Jose  Dima  Satria,  S.H.  Dima Satria, S.H. M.Kn. 
M.Kn.  
     
Perubahan  Direksi  dan  Komisaris  terakhir    Changes  in  the  last  Directors  and 
berdasarkan  akta  notaris  No.  127  tanggal   Commissioners  by  the  notarial  deed  
28  Mei  2019  dari  notaris  Ir.  Nanette  No.  127  on  May  28,  2019  of  notary  Ir. 
Cahyanie  Handari  Adi  Warsito,  S.H.,  yang  Nanette  Cahyanie  Handari  Adi  Warsito, 
telah  disetujui  oleh  Menteri  Hukum  dan  Hak  S.H.,  which  has  been  approved  by  
Asasi  Manusia  dengan  Surat  Keputusan   the  Minister  of  Law  and  Human  Rights  in 
No.  AHU-AH.01.03-0284718  tanggal  31  Mei  the  Decision  Letter  No.  AHU-AH.01.03-
2019.  0284718 dated May 31, 2019. 
 
 
 

10
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
PT Trans Jabar Tol (TJT)  PT Trans Jabar Tol (TJT) 
     
Pendirian  TJT  (kepemilikan  tidak  langsung    The  establishment  of  TJT  (indirect 
melalui  WTR)  adalah  sesuai  dengan  akta  ownership  through  WTR)  was  based  on 
notaris  No.  79  tanggal  19  Juli  2007  dari  notarial deed No. 79 dated July 19, 2007 of 
notaris  Humberg  Lie,  S.H.,  M.Kn.  Akta  notary  Humberg  Lie,  S.H.,  M.Kn.  This 
pendirian  ini  telah  mendapat  persetujuan  notarial  deed  has  been  approved  by               
oleh Menteri Hukum dan Hak Asasi Manusia  The  Minister  of  Law  and  Human  Rights 
melalui  surat  keputusan  No. W29-01398- through the decision letter No. W29-01398-
HT.01.01-TH.2007.  HT.01.01-TH.2007. 
     
Akuisisi  TJT  oleh  WTR  sesuai  dengan  akta  Acquisition  of  TJT  by  WTR  was  in 
notaris Jose Dima Satria, S.H., M.Kn No. 44  accordance  with  the  deed  of  notary  Jose 
tanggal  22 Desember  2015.  Akta  ini  telah  Dima  Satria,  S.H.,  M.Kn  No. 44  dated 
mendapat  persetujuan  oleh  Menteri  Hukum  December  22,  2015.  This  deed  was 
dan  Hak  Asasi  Manusia  melalui  surat  approved  by  Minister  of  Law  and  Human 
No. AHU-AH.01.03-0990894.  Rights  through  decision  letter  No.  AHU-
AH.01.03-0990894. 
 
Anggaran  Dasar  Perusahaan  telah     The  Company's  Articles  of  Association  has 
beberapa  kali  mengalami  perubahan,  been  amended  for  several  times,  most 
terakhir  berdasarkan  Akta  notaris  No.  4  recently  by  the  notarial  deed  No.  4  on 
tanggal  3  Januari  2019  dari  notaris  Febby  January  3,  2019  of  notary  Febby  Ruben 
Ruben  Hidayat  S.H.,  yang  telah  disetujui  Hidayat, S.H., which has been approved by           
oleh Menteri Hukum dan Hak Asasi Manusia  the  Minister  of  Law  and  Human  Rights  in 
dengan  Surat  Keputusan  No.  AHU- the  Decision  Letter  No.  AHU-AH.01.03-
AH.01.03-0002381  tanggal  3  Januari  2019  0002381  dated  January  3,  2019  related  to 
tentang Penambahan Modal.  Capital Addition. 
     
PT Pemalang Batang Tol Road (PBTR)    PT Pemalang Batang Tol Road (PBTR) 
     
Pendirian  PBTR,  (kepemilikan  tidak    The  establishment  of  PBTR,  (indirect 
langsung  melalui  WTR)  adalah  sesuai  ownership  through  WTR)  was  based  on 
dengan  akta  notaris  No.  10  tanggal  15 Juni  notarial  deed  No.  10  dated  June 15,  2006 
2006  dari  notaris  Bonardo  Nasution  S.H.  of notary Bonardo Nasution, S.H. The deed 
Akta  pendirian  ini  telah  mendapat  was  approved  by  the  Minister  of  Law  and 
persetujuan  dari  Menteri  Hukum  dan  Hak  Human  Rights  through  the  decision  letter 
Asasi  Manusia  melalui  surat  keputusan   No. C-20478 HT.01.01. TH 2006 dated July 
No.  C-20478  HT.01.01.  TH  2006  tanggal   13, 2006. 
13 Juli 2006. 
     
Selanjutnya  peralihan  pemegang  saham    Then change in ownership of PBTR to WTR 
PBTR  ke  dalam  WTR  berdasarkan  akta  was  based  on  notarial  deed  No.  57  dated 
notaris No. 57 tanggal 15 Pebruari 2016 dari  February  15,  2016  of  notary  Jose  Dima 
notaris Jose Dima Satria S.H., M.Kn. Akta ini  Satria S.H., M.Kn. The deed was approved 
telah  mendapat  persetujuan  oleh  Menteri  by  Minister  of  Law  and  Human  Rights 
Hukum  dan  Hak  Asasi  Manusia  melalui  through  the  decision  letter  No. AHU-
surat  keputusan  No.  AHU-AH.01.03- AH.01.03-0982070. 
0982070. 
     
Anggaran  Dasar  Perusahaan  telah     The  Company's  Articles  of  Association  has 
beberapa  kali  mengalami  perubahan,  been  amended  for  several  times,  most 
terakhir  berdasarkan  akta  notaris  No.  46  recently  by  the  notarial  deed  No.  46  on 
tanggal  21  Desember  2018  dari  notaris  December  21,  2018  of  notary  Catur  Virgo, 
Catur  Virgo  S.H.,  M.H.,  yang  telah  disetujui  S.H.,  M.H.,  which  has  been  approved  
oleh  Menteri  Hukum  dan  Hak  Asasi  by  the  Minister  of  Law  and  Human  
Manusia  dengan  Surat  Keputusan   Rights  in  the  Decision  Letter  
No.  AHU-0177882.AH.01.11.Tahun  2018  No.  AHU-0177882.AH.01.11.Tahun  2018 
tanggal 27 Desember 2018.  dated December 27, 2018. 
     
PT  Waskita  Sriwijaya  Tol  (WST)  (dh    PT  Waskita  Sriwijaya  Tol  (WST)  (formerly  
PT Sriwijaya Markmore Persada (SRIMP))  PT Sriwijaya Markmore Persada (SRIMP)) 
     
Pendirian SRIMP (kepemilikan tidak langsung    The  establishment  of  SRIMP  (indirect 
melalui  WTR)  adalah  sesuai  dengan  akta  ownership  through  WTR)  was  based  on 

11
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
notaris  No.  51  tanggal  18  Nopember  2011  notarial  deed  No.  51  dated  November  18, 
dari  notaris  Ilmiawan  Dekrit  Supatmo  S.H.,  2011  by  notary  Ilmiawan  Dekrit  Supatmo 
M.H.  Akta  pendirian  ini  telah  mendapat  S.H.,  M.H.  This  notarial  deed  was 
pengesahan  Menteri  Hukum  dan  Hak  approved  by  The  Minister  of  Law  and 
Asasi  Manusia  sesuai  dengan  Surat  Human  Rights  through  decision  letter 
Keputusan  No. AHU-56876.A.H.01.01.Tahun  No. AHU-56876.A.H.01.01.Tahun  2011, 
2011 tanggal 21 Nopember 2011.  dated November 21, 2011. 
     
Akuisisi  SRIMP  oleh  WTR  sesuai  dengan    The  acquisition  of  SRIMP  by  WTR  is  in 
akta  notaris  No.  26  dan  No.  27  tanggal  accordance  with  the  notarial  deed  No.  26 
12 Mei 2016 dari notaris Fathiah Helmi, S.H.  and  No. 27  dated  May  12,  2016  by  notary 
Fathiah Helmi, S.H. 
     
Berdasarkan  akta  notaris  No.  51  tanggal    Based  on  the  notarial  deed  No.  51  dated 
27 April 2017 dari notaris Fathiah Helmi S.H.,  April 27, 2017 by notary Fathiah Helmi S.H., 
WTR  membeli  saham  milik  PT  Persada  WTR  bought  the  shares  owned  by 
Tanjung Api-Api sebesar Rp 146.250.000.000  PT Persada Tanjung Api – Api amounted to 
atau  sebesar  29,25%,  saham  milik  Rp  146,250,000,000  or  equivalent  to 
PT  Kayson  Company  sebesar  29.25%,  shares  owned  by  PT  Kayson 
Rp 23.750.000.000  atau  sebesar  4,75%  dan  Company  amounted  to  Rp  23,750,000,000 
saham  milik  PT  Sriwijaya  Marga  Persada  or  equivalent  to  4.75%  and  shares  owned 
sebesar  Rp  20.000.000.000  atau  sebesar  by  PT  Sriwijaya  Marga  Persada  amounted 
4%,  sehingga  penyertaan  Perusahaan  to  Rp  20,000,000,000  or  equivalent  to  4%, 
meningkat menjadi 75,57%.  which  increased  the  Company’s  ownership 
to 75.57%. 
     
Berdasarkan  akta  notaris  No.  11  tanggal    Based  on  the  notarial  deed  No.  11  dated 
8  Juni  2018  dari  notaris  Catur  Virgo,  S.H.,  June  8,  2018  by  notary  Catur  Virgo  S.H., 
M.H.,  kepemilikan  WTR  di  SRIMP  berubah  M.H.,  the  ownership  of  WTR  in  SRIMP 
menjadi  Rp  112.700.000.000  sehingga  increased  to  Rp  112,700,000,000  which 
penyertaan  Perusahaan  meningkat  menjadi  raised the Company’s ownership to 98.99%. 
98,99%. 
     
Berdasarkan  akta  notaris  No.  49  tanggal    Based  on  notarial  deed  No.  49  dated 
21  Desember  2018  dibuat  oleh  notaris  Catur  December  21,  2018  made  by  notary  Catur 
Virgo,  S.H.,M.H  berkedudukan  di  Jakarta  Virgo, S.H., M.H based in West Jakarta and 
Barat  dan  mendapatkan  pengesahan  dari  obtaining approval from the Minister of Law 
Menteri  Hukum  dan  Hak  Asasi  Manusia  and  Human  Rights  through  Decree 
melalui  Surat  Keputusan  No.  AHU- No.  AHU-0000072.AH.01.02  dated  January 
0000072.AH.01.02  tanggal  2  Januari  2019  2,  2019  regarding  the  change  of  name  of     
mengenai  perubahan  nama  PT  Sriwijaya  PT  Sriwijaya  Markmore  Persada  into 
Markmore  Persada  menjadi  PT  Waskita  PT  Waskita  Sriwijaya  Tol  abbreviated  as 
Sriwijaya Tol disingkat WST.  WST. 
     
Anggaran  Dasar  Perusahaan  telah     The  Company's  Articles  of  Association  has 
beberapa  kali  mengalami  perubahan,  been  amended  for  several  times,  most 
terakhir  berdasarkan  akta  notaris  No.  35  recently  by  the  notarial  deed  No.  35  on 
tanggal  24  September  2019  dari  notaris  September  24,  2019 of  notary  Catur  Virgo, 
Catur  Virgo  S.H.,  M.H.,  yang  telah  disetujui  S.H.,  M.H.,  which  has  been  approved  
oleh  Menteri  Hukum  dan  Hak  Asasi  by  the  Minister  of  Law  and  Human  
Manusia  dengan  Surat  Keputusan   Rights  in  the  Decision  Letter  
No.  AHU-0074036.AH.01.02.Tahun  2019  No.  AHU-0074036.AH.01.02  Tahun  2019 
tanggal  24  September  2019.  Perubahan  dated  September  24,  2019.  The  changes 
yang dimaksud antara lain terkait perubahan  referred to include, among others, changes 
Pasal 3 ayat 2.  in the provisions of Article 3 paragraph 2. 
     
PT Waskita Bumi Wira (WBW)    PT Waskita Bumi Wira (WBW) 
     
Perusahaan  memiliki  penyertaan  sebesar    The  Company  had  an  initial  ownership  of 
48% atas modal disetor WBW atau sebesar  48%  on  the  paid  in  capital  of  WBW 
Rp 7.500.000.000, berdasarkan akta notaris  amounted  to  Rp  7,500,000,000,  based  on 
Jose  Dima  Satria,  S.H.,  M.  Kn  No.  43  the notarial deed of Jose Dima Satria, S.H., 
tanggal 28 Oktober 2014.  M. Kn. No. 43 dated October 28, 2014. 
 

12
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada  tanggal  9  Mei  2016,  berdasarkan    On  May  9,  2016,  based  on  the  Decree  of      
Keputusan Sirkular Rapat Umum Pemegang  the Circular Resolution of General Meeting 
Saham  (RUPS)  tangal  3  Mei  2016,  WTR  of  Shareholders  dated  May  3,  2016,  
membeli saham milik PT Energi Bumi Mining  WTR  bought  the  shares  owned  by  
sebesar  Rp  1.094.000.000,  sehingga  PT  Energi  Bumi  Mining  amounted  to  
penyertaan  Perusahaan  meningkat  menjadi  Rp  1,094,000,000,  which  increased           
55%.  the Company’s ownership to 55%. 
     
Berdasarkan  akta  notaris  No.  5  tanggal    Based on notarial deed No. 5 dated April 4, 
4  April  2016,  PT  Energi  Bumi  Mining  2016,  PT  Energi  Bumi  Mining  has  shares 
memiliki opsi saham untuk membeli kembali  option  to  buy  back  the  7%  ownership 
transfer  kepemilikan  7%  dari  WBW  sampai  transfer  from  WBW  until  December  31, 
dengan  31  Desember  2016.  Opsi  saham  2016.  The  shares  option  was  expired  and 
tersebut hangus dan WBW dikonsolidasi.  WBW was consolidated. 
     
Berdasarkan  akta  notaris  No.  13  tanggal    Based  on  the  notarial  deed  No.  13  dated 
8 Desember  2017  dari  notaris  Zulkifli  December 8,  2017,  by  notary  Zulkifli 
Harahap  S.H.,  Modal  Dasar  WBW  yang  Harahap  S.H.,  the  authorized  capital  of              
sebelumnya  berjumlah  50.000  lembar  the  WBW  changed  from  50,000  shares  to 
saham  menjadi  1.000.000  lembar  saham  1,000,000  shares  and  increase  in  
dan  peningkatan  modal  ditempatkan  dan  issued  capital  and  fully  paid  from         
disetor  yang        semula  Rp  7.500.000.000  Rp  7,500,000,000  to  Rp 554,957,000,000 
menjadi  Rp  554.957.000.000  sehingga  which  increased  WTR’s  ownership  to 
penyertaan  WTR  meningkat  menjadi  76.06%.  This  deed  was  approved  by 
76,06%.  Akta  ini  telah  mendapat  Ministry of  Law and Human Rights through 
pengesahan  dari  Menteri  Hukum  dan  Hak  decision  letter  No. AHU-0156761.AH.01.11 
Asasi  Manusia,  dengan  Surat  Keputusan  dated December 11, 2017. 
No.  AHU-0156761.AH.01.11  tanggal    
11 Desember 2017.   
   
Berdasarkan  surat  keterangan  notaris  Zulkifli  Based  on  the  letter  of  notary  Zulkifli 
Harahap  S.H.,  No.  364/NZH/PT/II/2018  Harahap  S.H.,  No.  364/NZH/PT/II/2018 
tanggal  1  Pebruari  2018  sehubungan  dengan  dated  February  1,  2018  in  connection  with 
Rapat  Umum  Pemegang  Saham  Luar  Biasa  the  Extraordinary  General  Shareholders 
(RUPSLB),  WTR  menambah  penyertaan    Meeting  (RUPSLB),  WTR  added   
pada  WBW  sebesar  Rp  826.718.000.000.  the  investment  in  WBW  amounted  to         
Perubahan  ini  telah  disahkan  sesuai  dengan  Rp  826,718,000,000.  This  amendment  has 
akta  notaris  Zulkifli  Harahap,  S.H  No.  10  been ratified in accordance with the notarial 
tanggal 9 Pebruari 2018.  deed  of  Zulkifli  Harahap,  S.H No.  10  dated 
February 9, 2018. 
   
Berdasarkan  akta  notaris  No.  18  tanggal    Based  on  the  notarial  deed  No.  18  dated 
27  Nopember  2018  dari  notaris  Zulkifli  November  27,  2018  by  notary  Zulkifli 
Harahap,  S.H.,  M.H.,  kepemilikan  Harahap  S.H.,  M.H.,  the  ownership 
WTR  di  WBW  berubah  menjadi  of  WTR  in  WBW  increased  to 
Rp  1.268.697.000.000.  Akta  ini  telah  Rp  1,268,697,000,000.  This  deed  was 
disahkan  oleh  Kementerian  Hukum  dan  Hak  approved by the Ministry of Law and Human 
Asasi  Manusia  No.  AHU-AH.01.03-0268229  Right  through  decision  letter  No. AHU-
tanggal 27 Nopember 2018.  AH.01.03-0268229  dated  November  27, 
2018. 
   
Perubahan  Direksi  dan  Komisaris  terakhir    Changes  in  the  last  Directors  and 
berdasarkan  akta  notaris  No.  15  tanggal   Commissioners by the notarial deed No. 15 
16 Januari 2019 dari notaris Insinyur Nanette  on  January  16,  2019  of  notary  Insinyur 
Cahyanie  Handari  Adi  Warsito,  S.H.,  yang  Nanette  Cahyanie  Handari  Adi  Warsito, 
telah  disetujui  oleh  Menteri  Hukum  dan   S.H.,  which  has  been  approved  by  
Hak Asasi Manusia dengan Surat Keputusan   the  Minister  of  Law  and  Human  Rights  in 
No.  AHU-AH.01.03-0031138  tanggal   Decision  Letter  No.  AHU-AH.01.03-
17 Januari 2019.  0031138 dated January 17, 2019. 
 
 
 
 

13
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
PT  Cibitung  Tanjung  Priok  Port  Tollways  PT  Cibitung  Tanjung  Priok  Port  Tollways 
(CTP)  (CTP) 
   
Pendirian  PT  MTD  CTP  Expressway  The  establishment  of  PT  MTD  CTP 
(kepemilikan  tidak  langsung  melalui  Expressway  (indirect  ownership  through 
WTR) adalah  sesuai  dengan  akta  notaris  WTR) was based on the notarial deed No. 4 
No. 4 tanggal 13 September 2006 dari notaris  dated september 13, 2006 of notary Martina, 
Martina  S.H.  Akta  pendirian  ini  telah  S.H. The deed was approved by the Minister 
mendapat  pengesahan  Menteri  Hukum  dan  of  Law  and  Human  Right  through  decision 
Hak  Asasi  Manusia  sesuai  dengan  Surat  letter  No. W7-02046  HT.01.01-TH.2006 
Keputusan  tanggal  23  Nopember  2006  dated November 23, 2006. 
No. W7-02046 HT.01.01-TH.2006. 
   
Peralihan  pemegang  saham  PT  MTD  CTP  Transfer  of  ownership  of  PT  MTD  CTP 
Expressway kepada WTR sesuai dengan akta  Expressway  to  WTR  was  based  on  notarial 
notaris  No.  15  tanggal  26  April  2017  dari  deed  No.  15  dated  April  26,  2017  of  notary 
notaris Zulkifli Harahap, S.H.  Zulkifli Harahap, S.H. 
   
Berdasarkan  akta  notaris  Drs.  Soebiantoro,  Based  on  notarial  deed  Drs.  Soebiantoro, 
S.H.,  No.  17  tanggal  24  Mei  2017  telah  S.H,  No.  17  dated  May  24,  2017  has 
disetujui  perubahan  nama  Perseroan  yang  approved  to  change  the  name  of  “PT  MTD 
sebelumnya  bernama  “PT  MTD  CTP  CTP Expressway” into “PT Cibitung Tanjung 
Expressway”  menjadi  “PT  Cibitung  Tanjung  Priok Port Tollways”. 
Priok Port Tollways”.   
   
Anggaran  Dasar  Perusahaan  telah  beberapa  The  Company's  Articles  of  Association  has 
kali  mengalami  perubahan,  terakhir  been  amended  for  several  times,  most 
berdasarkan akta notaris No. 8 tanggal 4 April  recently  by  the  notarial  deed  No.  8  on  April 
2019 dari notaris Ashoya Ratam, S.H.,  M.Kn,  4, 2019 of Ashoya Ratam, S.H., M.Kn, which 
yang  telah  disetujui  oleh  Menteri  Hukum  dan  has  been  approved  by  the  Minister  of  Law  
Hak  Asasi  Manusia  dengan  Surat  Keputusan  and  Human  Rights  in  his  Decision  Letter  
No.  AHU-0019193.AH.01.02.Tahun  2019  No.  AHU-0019193.AH.01.02.Tahun  2019 
tanggal  8  April  2019.  Perubahan  yang  dated  April  8,  2019.  Changes  referred  to 
dimaksud  antara  lain  terkait  perubahan  between  others  related  to  changes  in  
ketentuan  Pasal  4  yakni  terkait  peningkatan  the  provisions  of  Article  4  that  is  related  to  
Modal  Dasar  dari  Rp  1.052.870.000.000  the  increase  in  authorized  capital  
menjadi Rp 3.079.747.580.000.  from  Rp  1,052,870,000,000  to  become  
Rp 3,079,747,580,000. 
   
Berdasarkan  akta  notaris  No.  18  tanggal    Based  on  the  notarial  deed  No.  18  dated 
20  September  2019  dari  notaris  Drs.  September  20,  2019  by  notary  Drs. 
Soebiantoro,  S.H.,  kepemilikan  WTR  di  CTP  Soebiantoro S.H., the ownership of WTR in 
berubah  menjadi  Rp  696.304.700.000.  Akta  CTP increased to Rp 696,304,700,000. This 
ini  telah  disahkan  oleh  Kementerian  Hukum  deed  was  approved  by  the  Ministry  of  Law 
dan  Hak  Asasi  Manusia  No.  AHU-AH.01.03- and  Human  Right  through  decision 
0336756 tanggal 25 September 2019.  letter  No. AHU-AH.01.03-0336756  dated 
September 25, 2019.. 
     
PT Kresna Kusuma Dyandra Marga (KKDM)  PT Kresna Kusuma Dyandra Marga (KKDM) 
   
Pendirian KKDM (kepemilikan tidak langsung  The  estabilishment  of  KKDM  (indirect 
melalui  WTR)  adalah  sesuai  Akta  Pendirian  ownership  through  WTR)  was  based  on               
dari Notaris Mudofir Hadi S.H, No. 94 tanggal  the  notarial  deed  No.  94  dated  December 
20 Desember 1996. WTR memiliki penyertaan  20,  1996  of  notary  Mudofir  Hadi,  S.H.  WTR 
60% dari modal disetor KKDM.  owns 60% of paid up capital of KKDM. 
   
Berdasarkan akta notaris tanggal 8 Juni 2017  Based on notarial deed No. 25 dated June 8, 
dari  notaris  Jose  Dima  Satria,  S.H.,  M.Kn.  2017  of  notary  Jose  Dima  Satria,  S.H., 
No.  25,  WTR  membeli  kepemilikan  minoritas  M.Kn., WTR purchased a minority interest in 
pada  saham  KKDM  sebesar  38,97%  atau  KKDM amounted to 38.97% or equivalent to  
senilai  Rp 525.000.000.000,  sehingga  Rp 525,000,000,000, bringing the ownership 
kepemilikan WTR menjadi 98,97%.  of WTR to 98.97%. 
     

14
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Berdasarkan  akta  notaris  No.  17  tanggal    Based  on  notarial  deed  No.  17  dated 
20  Desember  2017  dari  notaris  Ariani  L.  December  20,  2017  by  notary  Ariani  L. 
Rachim,  S.H.,  WTR  membeli  penerbitan  Rachim, S.H., WTR bought 0.57% issuance 
saham  KKDM  sebesar  0,57%  sehingga  of  KKDM  shares  and  bringing  the  WTR’s 
kepemilikan  WTR  atas  KKDM  menjadi  ownership on KKDM to 99.54%. 
99,54%.   
   
Berdasarkan  akta  notaris  No.  3  tanggal  Based  on  notarial  deed  No.  3  dated 
9  Februari  2018  dari  notaris  Ariani  L.  February  9,  2018  of  notary  Ariani  L. 
Rachim,  S.H.,  perihal  Keputusan  Sirkular  Rachim,  S.H.,  regarding  the  Circular 
Rapat  Umum  Pemegang  Saham  (RUPS)  Resolution  of  General  Meeting  of 
tanggal  24  Januari  2018,  WTR  menambah  Shareholders  (AGM)  dated  January  24, 
penyertaan  pada  KKDM  sebesar  2018,  WTR  increased  its  ownership  in 
Rp 73.476.879.000.  KKDM amounted to Rp 73,476,879,000. 
   
Berdasarkan  akta  notaris  No.  4  tanggal   Based on notarial deed No. 4 dated June 5, 
5  Juni  2018  dari  notaris  Ariani  L.  Rachim,  2018 of notary Ariani L. Rachim, S.H., WTR 
S.H.,  WTR  menambah  penyertaan  pada  increased  its  ownership  in  KKDM      
KKDM  sebesar  Rp  49.124.000.000,  amounted  to  Rp  49,124,000,000,  bringing 
sehingga  kepemilikan  WTR  menjadi  the ownership of WTR to 99.64%, which has 
99,64%,  yang  telah  disetujui  oleh  Menteri  been  approved  by  the  Minister  of  Law and 
Hukum  dan  Hak  Asasi  Manusia  dengan  Human  Rights  in  Decision  Letter  
Surat  Keputusan  No.  AHU-AH.01.03- No.  AHU-AH.01.03-0216005  dated  June 
0216005 tanggal 26 Juni 2018.  26, 2018. 
   
Anggaran  dasar  Perusahaan  telah  The  Company's  Articles  of  Association  has 
mengalami  beberapa  kali  perubahan  dan  been  amended  for  several  times,  most 
yang  terakhir  berdasarkan  akta  notaris   recently  by  the  notarial  deed  No.  15  on 
No.  15  tanggal  9  Januari  2019  dari  notaris  January 9, 2019 of notary Ariani L. Rachim, 
Ariani L. Rachim, S.H., mengenai perubahan  S.H.,  regarding  changes  in  the  Company’s 
anggaran  dasar  Perusahaan  sehubungan  issued  and  increased  paid  capital  stocks.  
dengan penerbitan dan penambahan modal.  The  amendment  had  been  approved  by  
Perubahan  ini  telah  disetujui  oleh  Menteri  the  Minister  of  Law  and  Human  Rights  in 
Hukum dan Hak Asasi Manusia dalam Surat  Decision Letter No. AHU-AH.01.03-0016493 
Keputusan  No.  AHU-AH.01.03-0016493  dated January 11, 2019. 
tanggal 11 Januari 2019. 

PT Tol Teluk Balikpapan (TTB)  PT Tol Teluk Balikpapan (TTB) 
   
Pendirian  TTB  (kepemilikan  tidak  langsung  The  establishment  of  TTB  (indirect 
melalui  WTR)  adalah  sesuai  dengan  akta  ownership  through  WTR)  was  based  on 
notaris  No.  42  tanggal  16  September   notarial  deed  No.  42  dated  September  16, 
2016  dari  notaris  Yeti  Liana,  S.Psi.,  S.H.,  2016  of  notary  Yeti  Liana,  S.  Psi.,  S.H., 
M.Kn.  Akta  pendirian  ini  telah  mendapat  M.Kn.  The  deed  of  establishment  was 
persetujuan  oleh  Menteri  Hukum  dan   approved  by  the  Minister  of  Law  and 
Hak  Asasi  Manusia  melalui  surat   Human  Rights  through  its  decision  letter 
keputusan  tanggal  21  September  2016   dated  September  21,  2016  No.  AHU-
No.  AHU-0041732.AH.01.01.TAHUN  2016.  0041732.AH.01.01.  TAHUN  2016.  WTR,  a 
WTR,  entitas  anak,  memiliki  penyertaan  subsidiary,  holds  a  60%  interest  in  TTB  or 
sebesar  60%  pada  TTB  atau  setara                                
equivalent to Rp 12,000,000,000. 
Rp 12.000.000.000. 
   
PT Waskita Fim Perkasa Realti (WFPR)  PT Waskita Fim Perkasa Realti (WFPR) 
   
Pendirian  WFPR  (kepemilikan  tidak  The  establishment  of  WFPR  (indirect 
langsung  melalui  WKR)  adalah  sesuai  ownership  through  WKR)  was  based  on 
dengan akta notaris No. 122 tanggal 31 Mei  notarial  deed  No.  122  dated  May  31,  2018 
2018  dari  notaris  Rosida  Rajagukguk  of  notary  Rosida  Rajagukguk  Siregar.              
Siregar.  Akta  pendirian  ini  telah  mendapat  The  deed  of  establishment  was  approved 
persetujuan  oleh  Menteri  Hukum  dan   by  the  Minister  of  Law  and  Human  Rights 
Hak  Asasi  Manusia  melalui  surat   through decision letter dated May 31,  2018 
keputusan  tanggal  31  Mei  2018   No. AHU-0075663.AH.01.11.TAHUN 2018. 
No. AHU-0075663.AH.01.11.TAHUN 2018. 
   

15
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Anggaran  dasar  WFPR  telah  mengalami    WFPR’s  Article  of  Association  has  been 
perubahan,  terakhir  berdasarkan  Akta   amended,  most  recently  based  on  notarial 
No.  222  dari  Notaris  Rosida  Rajaguguk- deed No. 222 of Rosida Rajaguguk-Siregar, 
Siregar,  S.H.,  M.Kn.,  tanggal  29  April  2019  S.H.,  M.Kn.,  dated  April  29,  2019  WKR 
tentang penambahan penyertaan WKR pada  increased  its  investment  in  WFPR 
WFPR  sebesar  Rp  147.312.000.000  amounted  to  Rp  147,312,000,000, 
sehingga  kepemilikan  menjadi  60%  atau  increasing  ownership  to  60%  or  equivalent 
setara  dengan  Rp  221.301.000.000.  to  Rp  221,301,000,000.  This  amendment 
Perubahan  ini  telah  disetujui  oleh  Menteri  has  been  approved  by  the  Minister  of  Law 
Hukum  dan  Hak  Asasi  Manusia  dengan  and  Human  Rights  in  his  Decision  Letter 
Surat  Keputusan  No.  AHU-AH.01.03- No.  AHU-AH.01.03-0233382  dated  May  8, 
0233382 tanggal 8 Mei 2019.  2019. 
     
Pada  tanggal  28  Juni  2019  berdasarkan  On  June  28,  2019  based  Notarial  Deed  
akta  Notaris  No.  76  oleh  Rosida  No. 76 of Rosida Rajagukguk-Siregar, S.H., 
Rajagukguk-Siregar,  S.H.,  M.Kn.,  Notaris  di  M.Kn.,  Notary  in  Jakarta,  WFPR 
Jakarta,  WFPR  melakukan  restrukturisasi  restructuring  payable  to  shareholder,  WKR 
utang  kepada  para  pemegang  saham  WKR  and  PT  Graha  Jasa  Ekatama  (”GJE”)  
dan  PT  Graha  Jasa  Ekatama  (”GJE”)  into  paid-in  capital  respective  as  
menjadi  setoran  modal  dengan  masing- amount  Rp  17,400,000,000  and  
masing  setoran  modal  sebesar   Rp 11,600,000,000. 
Rp 17.400.000.000 dan Rp 11.600.000.000. 
   
PT Waskita Modern Realty (WMR)  PT Waskita Modern Realty (WMR) 
   
Pendirian WMR (kepemilikan tidak langsung  The  establishment  of  WMR  (indirect 
melalui  WKR)  adalah  sesuai  dengan  akta  ownership  through  WKR)  was  based  on 
notaris  No.  7  tanggal  17  Mei  2018  dari  notarial  deed  No.  7  dated  May  17, 2018  of 
notaris  Dewi  Tenti  Septi  Artiany  S.H.,  M.H.,  notary Dewi  Tenti  Septi Artiany S.H., M.H., 
M.Kn.,.  Akta  pendirian  ini  telah  mendapat  M.Kn.,.  The  deed  of  establishment  was 
persetujuan  oleh  Menteri  Hukum  dan  Hak  approved  by  the  Minister  of  Law  and 
Asasi  Manusia  melalui  surat  keputusan  Human Rights through decision letter dated 
tanggal  17  Mei  2018  No.  AHU- May 17, 2018 No. AHU-0069024.AH.01.11. 
0069024.AH.01.11.TAHUN 2018.   TAHUN 2018. 
   
Anggaran  dasar  Perusahaan  telah  The  Company's  Articles  of  Association  has 
mengalami  beberapa  kali  perubahan  dan  been  amended  for  several  times,  most 
yang  terakhir  berdasarkan  akta  notaris   recently  by  the  notarial  deed  No.  4  on  July 
No. 4 tanggal 13 Juli 2018 dari notaris Dewi  13, 2018 of notary Dewi Tenti Septi Artiany, 
Tenti  Septi  Artiany,  S.H.,  M.H.,  M.Kn.,.  S.H.,  M.H.,  M.Kn.,.  The  amendment  had 
Perubahan  ini  telah  disetujui  oleh   been  approved  by  the  Minister  of  Law  and 
Menteri  Hukum  dan  Hak  Asasi   Human  Rights  in  his  Decision  Letter  
Manusia  dalam  Surat  Keputusan   No.  AHU-0014522.AH.01.02.Tahun  2018 
No.  AHU-0014522.AH.01.02.Tahun  2018  dated July 18, 2018. 
tanggal 18 Juli 2018. 
   
Perusahaan  dan  entitas  anak  selanjutnya  secara  The  Company  and  subsidiaries  herein  after  will 
bersama-sama disebut sebagai “Grup”.  be referred as “the Group”. 
   
1.c. Penawaran Umum Efek Perusahaan    1.c. The Public Offering of the Company's
Securities 
 

Saham    Shares 
   
 
Pada  tanggal  10  Desember  2012,    On December 10, 2012, the Company obtained 
Perusahaan  memperoleh  pernyataan  efektif  an  effective  statement  from  the  Chairman  of  
dari  Ketua  Badan  Pengawas  Pasar   the  Capital  Market  and  Financial  Institution 
Modal  dan  Lembaga  Keuangan   Supervisory  Agency  (Bapepam-LK)  through 
(Bapepam-LK)  berdasarkan  surat  keputusan  decree No. S-14012/BL/2012.
No. S-14012/BL/2012. 
     
Pada  tanggal  17  Desember  2012    On  December  17,  2012,  according  to  letter  
berdasarkan  surat  No.  S-08414/BEI.PPJ/12- No.  S-08414/BEI.PPJ/12-2012,  Indonesian 
2012  Bursa  Efek  Indonesia  (BEI)  menyetujui  Stock  Exchange  (IDX)  agreed  to  the  public 

16
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
penawaran  efek  Perusahaan  di  BEI  kepada  offering  of  the  Company  on  IDX  for 
masyarakat  atas  3.082.315.000  saham  biasa  3,082,315,000  of  common  stock  with  the  par 
dengan  nilai  nominal  Rp 100  per  saham  dan  value  Rp 100  per  share  and  the  offering  price 
harga penawaran Rp 380 per saham.  Rp 380 per share. 
     
Dari  jumlah  saham  yang  ditawarkan  dalam    From the number of shares offered in the public 
penawaran  umum  kepada  masyarakat  offering  of  6.25%  or  192,644,000  of  new 
sebesar  6,25%  atau  sebanyak  192.644.000  ordinary  shares  is  allocated  to  the  employees 
saham  biasa  atas  nama  baru  dijatahkan  through  the  allocation  shares  program  of           
kepada  karyawan  Perusahaan  melalui  the  Company  (Employee  Stock  Allocation/ 
program  penjatahan  saham  untuk  pegawai  ESA). 
Perusahaan  (Employee  Stock  Allocation/ 
ESA). 

Pada  tanggal  19  Desember  2012,  seluruh    On December 19, 2012, a total of 9,632,236,000 


saham  Perusahaan  sebanyak  9.632.236.000  shares of the  Company  were listed on  the  IDX. 
saham  telah  tercatat  pada  BEI.  Pada   On  the  date  June  10,  2015,  the  Company 
tanggal  10  Juni  2015,  Perusahaan  obtained an effective statement from The Board 
memperoleh  pernyataan  efektif  dari  Dewan  of  Commissioners  of  the  Financial  Services 
Komisioner  Otoritas  Jasa  Keuangan  (OJK)  Authority (OJK) of the Registration Statement in 
atas  Pernyataan  Pendaftaran  dalam   the Limited Public Offering I (LPO I) through its 
rangka  Penawaran  Umum  Terbatas  I   decree No. S-238/D.04/2015. 
(PUT  I)  berdasarkan  surat  keputusan  
No. S-238/D.04/2015. 
     
Pada  tanggal  7  Juli  2015,  seluruh  saham    On  July  7,  2015,  all  the  Company’s  shares 
Perusahaan  melalui  PUT  I  sebanyak  through  the  LPO  I  amounted  to  3,653,498,200 
3.653.498.200  saham  telah  tercatat  pada  shares that have been listed in the IDX, bringing    
BEI,  sehingga  jumlah  keseluruhan  saham  the  number  of  shares  of  the  Company  after     
Perusahaan  setelah  PUT  I  menjadi  sebesar  the LPO I amounted to 13,567,473,560 shares. 
13.567.473.560 saham. 
     
Obligasi    Bonds 
     
Perusahaan  telah  menerbitkan  obligasi    The  Company  has  issued  bonds  with               
dengan rincian sebagai berikut:  the following details are as follows: 
 
Jumlah/
Obligasi/ Amount Tahun/ Tanggal Penerbitan/ Jatuh Tempo/
No Bonds Rp Years Date of Issuance Due Date Status
1 Seri B/ Tranche B             675.000.000.000 5 5 Juni/ June 5,  2012 5 Juni/ June 5,  2017 Lunas/ Paid
2 Berkelanjutan I/ Shelf  I             500.000.000.000 3 10 Nopember/ November 10,  2014 10 Nopember/ November 10,  2017 Lunas/ Paid
3 Berkelanjutan I Tahap II Seri A/ 
Shelf I Phase II Tranche A             350.000.000.000 3 16 Oktober/ October 16,  2015 16 Oktober/ October 16,  2018 Lunas/ Paid
4 Berkelanjutan I Tahap II Seri B
Shelf I Phase II Tranche B          1.150.000.000.000 5 16 Oktober/ October 16,  2015 16 Oktober/ October 16,  2020 Belum Lunas/ Outstanding
5 Berkelanjutan II Tahap I
Shelf II Phase I          2.000.000.000.000 3 10 Juni/ June 10,  2016 10 Juni/ June 10,  2019 Lunas/ Paid
6 Berkelanjutan II Tahap II
Shelf II Phase II              900.000.000.000 5 28 September/ September 28,  2016 28 September/ September 28,  2021 Belum Lunas/ Outstanding
7 Berkelanjutan II Tahap III Seri A
Shelf II Phase III Tranche A             747.000.000.000 3 21 Pebruari/ February 21,  2017 21 Pebruari/ February 21,  2020 Belum Lunas/ Outstanding
8 Berkelanjutan II Tahap III Seri B 
Shelf II Phase III Tranche B             910.000.000.000 4 21 Pebruari/ February 21,  2017 21 Pebruari/ February 21,  2022 Belum Lunas/ Outstanding
9 Berkelanjutan III Tahap I Seri A 
Shelf III Phase I Tranche A          1.369.000.000.000 3 6 Oktober/ October 6,  2017 06 Oktober/ October 6,  2020 Belum Lunas/ Outstanding
10 Berkelanjutan III Tahap I Seri B
Shelf III Phase I Tranche B          1.631.000.000.000 5 6 Oktober/ October 6,  2017 06 Oktober/ October 6,  2022 Belum Lunas/ Outstanding
11 Berkelanjutan III Tahap II Seri A 
Shelf III Phase II Tranche A          1.175.000.000.000 3 23 Februari/ February  23,  2018 23 Februari/ February  23,  2021 Belum Lunas/ Outstanding
12 Berkelanjutan III Tahap II Seri B
Shelf III Phase II Tranche B          2.276.500.000.000 5 23 Februari/ February  23,  2018 23 Februari/ February  23,  2023 Belum Lunas/ Outstanding
13 Berkelanjutan III Tahap III Seri A 
Shelf III Phase III Tranche A             761.000.000.000 3 28 September/ September 28,  2018 28 September/ September 28,  2021 Belum Lunas/ Outstanding
14 Berkelanjutan III Tahap III Seri B
Shelf III Phase III Tranche B             941.750.000.000 5 28 September/ September 28,  2018 28 September/ September 28,  2023 Belum Lunas/ Outstanding
15 Berkelanjutan III Tahap IV Seri A 
Shelf III Phase III Tranche A             484.000.000.000 3 16 Mei/ May 16,  2019 16 Mei/ May 16,  2022 Belum Lunas/ Outstanding
16 Berkelanjutan III Tahap IV Seri B
Shelf III Phase III Tranche B          1.361.750.000.000 5 16 Mei/ May 16,  2019 16 Mei/ May 16,  2024 Belum Lunas/ Outstanding
 

17
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
1.d. Bidang Usaha   1.d. The Scope of Business
 
Sesuai  dengan  pasal  3  Anggaran  Dasar    In  accordance  with  article  3  of  the  Company’s 
Perusahaan,  maksud  dan  tujuan  Perusahaan  Articles  of  Association,  the  objectives  of            
adalah  melakukan  usaha  di  bidang  industri  the  Company  are  to  doing  business  in 
konstruksi,  industri  pabrikasi,  jasa  penyewaan,  construction  industry,  manufacturing  industry, 
jasa  keagenan,  investasi,  agro  industri,  leasing  service,  agency  services,  investment, 
pekerjaan  terintegrasi  (Engineering,  agro  industry,  integrated  work  (Engineering, 
Procurement  and  Construction:  EPC),  Procurement  and  Construction:  EPC),  trade, 
perdagangan,  pengelolaan  kawasan,  layanan  area  management,  construction  improvement 
jasa  peningkatan  kemampuan  di  bidang  services,  information  technology  and  tourism  as 
konstruksi,  teknologi  informasi  serta  well  as  optimizing  the  utilization  of  resources 
kepariwisataan  serta  optimalisasi  pemanfaatan  owned  by  the  Company  to  produce  high  quality 
sumber  daya  yang  dimiliki  Perusahaan  untuk  and strong  competitive  goods  and/or  services  to 
menghasilkan  barang  dan/atau  jasa  yang  gain/pursue  profit  to  increase  the  Company's 
bermutu  tinggi  dan  berdaya  saing  kuat,  untuk  value  by  applying  the  principles  of  Limited 
mendapat/mengejar  keuntungan  guna  Liability Company. 
meningkatkan  nilai  Perusahaan  dengan 
menerapkan prinsip-prinsip Perseroan Terbatas. 
     
Untuk  mencapai  maksud  dan  tujuan  tersebut  di    In  order to  achieve the objectives, the Company 
atas,  Perusahaan  dapat  melaksanakan  kegiatan  engaged  in  the  following  activities  Construction 
usaha  yaitu  Pekerjaan  pelaksanaan  konstruksi,  execution work, mining services, integrated EPC, 
jasa  pertambangan,  pekerjaan  terintegrasi  EPC,  design  and  build,  management  consultant 
perancangan  dan  pembangunan,  layanan  jasa  service,  building  management,  building 
konsultasi  manajemen,  gedung  manajemen,  components  and  raw  material  fabrication, 
pabrikasi  bahan  dan  komponen  bangunan,  component  and  construction  tools  fabrication, 
pabrikasi  komponen  dan  peralatan  konstruksi,  metals,  woods,  rubber,  and  plastic  fabrication, 
pabrikasi  barang  logam,  kayu,  karet dan  plastik,  agency  services  for  raw  materials,  building 
penyewaan  peralatan  konstruksi,  layanan  jasa  components  and  construction  equipment, 
keagenan bahan dan komponen bangunan serta  investment and/or business management in area 
peralatan  konstruksi,  investasi  dan/atau  of  basic  facility  and  infrastructure  and  industry, 
pengelolaan  usaha  di  bidang  prasarana  dan  performing activities in agro industry field, export-
sarana dasar serta industri, melakukan usaha di  import,  general  trading,  area  management, 
bidang agro industri, ekspor-impor, perdagangan  system  development,  service  in  information 
umum,  pengelolaan  kawasan,  pengembangan  technology and tourism and realty development. 
sistem,  layanan  jasa  bidang  teknologi  informasi   
dan kepariwisataan dan pengembangan realty. 
     
Kegiatan  usaha  Perusahaan  yang  saat  ini  telah    The  Company's  current  business  activities  are 
dijalankan  Perusahaan  adalah  kegiatan  construction activities and integrated EPC. 
pelaksanaan  konstruksi  dan  pekerjaan 
terintegrasi EPC. 

1.e. Organisasi 1.e. Organization


     
Struktur Organisasi    Organization Structure 
     
Berdasarkan  Surat  Keputusan  Menteri  Negara    According  to  the  Decree  of  State  Ministry  of 
Badan Usaha Milik Negara (BUMN) dalam Rapat  State  Owned  Enterprise  (SOE)  in  General 
Umum  Pemegang  Saham  (RUPS)  Perusahaan  Meeting of Shareholders (GMS) of the Company 
tanggal  9  Mei  2019,  menetapkan  7  (tujuh)  dated May 9, 2019, appointed 7 (seven) directors 
anggota  direksi  Perusahaan  yaitu  seorang  of the Company consisting of a president director 
direktur utama dan 6 (enam) direktur.  and 6 (six) directors. 
   
Wilayah  kerja  sesuai  Surat  Keputusan  Direksi    Work  areas  according  to  the  Decision  Letter  
No. 03/SK/WK/2019 tentang Perubahan Struktur  of  Director  No.  03/SK/WK/2019  concerning 
Organisasi  Perusahaan.  Unit  bisnis  memiliki  Changes  in  the  Organizational  Structure  of  
5 (lima) divisi, sebagai berikut:  the  Company.  The  business  unit  have  5  (five) 
divisions, as follows: 
 
 

18
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Unit Bisnis/ Wilayah Operasi/ Kedudukan/
Business Unit Work Areas Location

Divisi Gedung/ Daerah operasional meliputi seluruh Indonesia dan luar negeri (kecuali Timor Jakarta
Building Division Leste) berkedudukan di Jakarta dengan melaksanakan kegiatan Perusahaan
dalam bidang pemasaran sampai dengan produksi untuk pekerjaan proyek-
proyek gedung, bandara, jalan kereta api dan LRT, serta proyek-proyek investasi
dan pengembangan terpilih yang ditetapkan Direksi dengan nilai kontrak > Rp
200 Miliar.

Operational area covers the whole area of Indonesia and abroad (except Timor
Leste), domiciled in Jakarta to perform its activities in the marketing's area to
production for the entire building project for the works of buildings, airports,
railways and LRT projects, as well as investment projects and selected
development established by the Board of Directors with contract value > Rp 200
Billion.

Divisi Infrastruktur I/ Daerah operasional meliputi Pulau Sumatera berkedudukan di Medan dengan Medan
Infrastructure I Division  melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan
produksi untuk pekerjaan proyek-proyek infratruktur sipil seperti bendungan
besar, jembatan bentang panjang, jalan termasuk jalan tol serta proyek-proyek
investasi dan pengembangan terpilih yang ditetapkan oleh Direksi dengan nilai
kontrak > Rp 200 Miliar.

Operational area covers the Sumatera Island, domiciled in Medan to perform its
activities in the marketing up to production for civil infrastructure projects such as
large dams, long spans bridges, roads including toll roads, as well as selected
investment and development projects set by the Board of Directors with contract
value> Rp 200 Billion.

Divisi Infrastruktur II/ Daerah operasional meliputi Banten, DKI Jakarta, Jawa Barat, DI Yogyakarta, Jakarta
Infrastructure II Division  Jawa Tengah, Kalimantan Barat dan Kalimantan Tengah, berkedudukan di
Jakarta dengan melaksanakan kegiatan Perusahaan dalam bidang pemasaran
sampai dengan produksi untuk pekerjaan proyek-proyek infratruktur sipil seperti
bendungan besar, jembatan bentang panjang, jalan termasuk jalan tol serta
proyek-proyek investasi dan pengembangan terpilih yang ditetapkan oleh Direksi
dengan nilai kontrak > Rp 200 Miliar.

Operational area covers the Banten, DKI Jakarta, West Java, DI Yogyakarta,
Central Java, West Kalimantan, and Central Kalimantan, domiciled in Jakarta to
perform its activities in the marketing up to production for civil infrastructure
projects such as large dams, long spans bridges, roads including toll roads, as
well as selected investment and development projects set by the Board of
Directors with contract value> Rp 200 Billion.

Divisi Infrastruktur III/ Surabaya
Daerah operasional meliputi Jawa Timur, Bali, NTB, NTT, Kalimantan Timur,
Infrastructure III Division 
Kalimantan Utara, Kalimantan Selatan, Sulawesi, Maluku dan Papua serta Timor
Leste, berkedudukan di Surabaya dengan melaksanakan kegiatan Perusahaan
dalam bidang pemasaran sampai dengan produksi untuk pekerjaan proyek-
proyek infratruktur sipil seperti bendungan besar, jembatan bentang panjang,
jalan termasuk jalan tol serta proyek-proyek investasi dan pengembangan terpilih
yang ditetapkan oleh Direksi dengan nilai kontrak > Rp 200 Miliar.

Operational area covers the East Java, Bali, NTB, NTT, East Kalimantan, North
Kalimantan, South Kalimantan, Sulawesi, Maluku, and Papua as well as Timor
Leste, domiciled in Surabaya to perform its activities in the marketing up to
production for civil infrastructure projects such as large dams, long spans bridges, 
roads including toll roads, as well as selected investment and development
projects set by the Board of Directors with contract value> Rp 200 Billion.

Divisi EPC/ Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan Jakarta
EPC Division melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan
produksi untuk pekerjaan proyek-proyek EPC dan proyek-proyek investasi dan
pengembangan terpilih yang ditetapkan oleh Direksi, dengan tidak ada batasan
nilai kontrak .

Operational area covers the whole area of Indonesia, domiciled in Jakarta to


perform its activities in the marketing up to production for EPC projects and
devolepment projects chosen by Directors, with no contract restriction.
 
 
 
 
 
 
 

19
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
1.f. Susunan Dewan Komisaris, Direksi dan   1.f. The Composition of Board of
Karyawan   Commissioners, Directors and Employees
 
Susunan  Komisaris  dan  Direksi  ditetapkan    The  composition  of  Commissioners  and 
berdasarkan  akta  notaris  No.  44  tanggal  15  Mei  Directors  were  based  on  notarial  deed  
2019  yang  dibuat  dihadapan  notaris  Ashoya  No.  44  dated  May  15,  2019  by  notary  Ashoya 
Ratam,  S.H.,  M.Kn.,  yang  telah  disetujui  oleh  Ratam, S.H., M.Kn., which has been approved 
Menteri  Hukum  dan  Hak  Asasi  Manusia  dengan  by the Minister of Law and Human Rights in his 
Surat  Keputusan  No.  AHU-AH.01.03-0269715  Decision  Letter  No.  AHU-AH.01.03-0269715 
tanggal 21 Mei 2019. dated May 21, 2019.
     
Susunan  pengurus  Dewan  Komisaris  dan  Direksi    The  composition  of  the  Company’s  Board  of 
Perusahaan  pada  tanggal  30  September  2019  Commissioners and Directors as of September 
dan 31 Desember 2018 adalah sebagai berikut: 30,  2019  and  December  31,  2018  are  as 
follows: 
     
30 September/ September 30, 2019 31 Desember/ December 31, 2018
Komisaris Utama Badrodin Haiti Badrodin Haiti President Commissioner
Komisaris Independen M. Aqil Irham  M. Aqil Irham  Independent Commissioners
Viktor S. Sirait Viktor S. Sirait
Muradi Muradi
Komisaris Danis H. Sumadilaga Danis H. Sumadilaga Commissioners
Robert Leonard Marbun Arif Baharudin 
R Agus Sartono R Agus Sartono
 
30 September/ September 30, 2019 31 Desember/ December 31, 2018
Direktur Utama I Gusti Ngurah Putra I Gusti Ngurah Putra President Director
Direktur Independen Hadjar Seti Adji Hadjar Seti Adji Independent Director
Wahyu Utama Putra
Direktur Didit Oemar Prihadi Didit Oemar Prihadi Directors
Bambang Rianto Bambang Rianto
Fery Hendriyanto Fery Hendriyanto
Haris Gunawan Haris Gunawan
Gunadi
 
Komite  Audit  diangkat  melalui  surat  keputusan    The  audit  Committee  was  appointed  by 
komisaris  No.  02/SK/WK/DK/2018  tanggal  the  decision  letter  of  commissioner 
2 Oktober 2018.  No. 02/SK/WK/DK/2018 dated October 2, 2018. 
     
Susunan  Komite  Audit  Perusahaan  pada  tanggal    The  composition  of  the  Company’s  Audit 
30  September  2019  dan  31  Desember  2018  Committee  as  of  September  30,  2019  and 
adalah sebagai berikut:  December 31, 2018 are as follows: 
 
30 September/ September 30, 2019
31 Desember/ December 31, 2018
Ketua Viktor S. Sirait Head
Anggota R. Agus Sartono Members
Suyanto
Ihda Muktiyanto
 
Komite Risiko dan Asuransi diangkat melalui surat    The  risk  and  Insurance  Committee  was 
keputusan  komisaris  No.  12/SK/WK/DK/2015  appointed  by  the  decision  letter  of 
tanggal  30  September  2015  mengenai  commissioner  No.  12/SK/WK/DK/2015  of 
penggantian anggota Komite Risiko dan Asuransi.  September 30, 2015 regarding the replacement 
of Risk and Insurance’s Committee members. 
     
Susunan  Komite  Risiko  dan  Asuransi  Perusahaan    The  composition  of  the  Company’s  Risk  and 
pada  tanggal  30  September  2019  dan  Insurance  Committee  as  of  September  30, 
31 Desember 2018 adalah sebagai berikut:  2019 and December 31, 2018 are as follows: 
 
30 September/ September 30, 2019
31 Desember/ December 31, 2018
Ketua M. Aqil Irham Head
Anggota Danis H. Sumadilaga Members
Ahmad Syarif Munawi 
Zulfan Zahar

20
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
   
 
 

Internal  Audit  Perusahaan  diangkat  melalui  surat    The  Company’s  Internal  Audit  was  appointed 
keputusan direksi No. 42/SK/WK/PEN/2018 tanggal  by  the  decision  letter  of  director 
26  Juni  2018  mengenai  Pemberhentian  dan  No.  42/SK/WK/PEN/2018  of  June  26,  2018 
Pengangkatan  Pejabat  Struktural  Unit  Kerja  dan  regarding  the  Dismissal  and  Appointment  of 
Unit Bisnis.  Structural  Officials  of  Work  Unit  and  Business 
  Unit. 
   
Senior Vice President Internal Audit dan Corporate  The Company’s Senior Vice President Internal 
Secretary  pada  tanggal  30  September  2019  dan  Audit  and  Corporate  Secretary  as  of 
31 Desember 2018 adalah sebagai berikut:  September  30,  2019  and  December  31,  2018 
  are as follows: 
 
30 September/ September 30, 2019
31 Desember/ December 31, 2018

Senior Vice President Internal Audit  Pius Sutrisno Riyanto Senior Vice Precident Internal Audit


Corporate Secretary Shastia Hadiarti Corporate Secretary
   

Jumlah  remunerasi  yang  diterima  oleh  Dewan    The  total  remuneration  received  by  the  Board 
Komisaris  untuk  periode  sembilan  bulan  yang  of  Commissioners  for  the  nine  month  periods 
berakhir  tanggal  30  September  2019  dan  2018  ended  September  30,  2019  and  2018 
masing-masing  sebesar  Rp 8.410.603.636  dan  were  amounted  to  Rp  8,410,603,636  and 
Rp 6.226.200.000.  Rp 6,226,200,000, respectively. 
     
Jumlah  remunerasi  yang  diterima  oleh    The  total  remuneration  received  by 
Direksi  untuk  periode  sembilan  bulan  yang  the  Directors  for  the  nine  month  periods 
berakhir  tanggal  30  September  2019  dan  2018  ended  September  30,  2019  and  2018 
masing  -  masing  sebesar  Rp 16.265.945.455  dan  were  amounted  to  Rp 16,265,945,455  and 
Rp 12.368.333.333.  Rp 12,368,333,333, respectively. 
     
Grup  memiliki  karyawan  tetap  (tidak  diaudit)    The  Group  has  an  average  number  of  2,382 
masing-masing  sebesar  2.382  dan  2.420  orang  and  2,420  employees  (unaudited)  as  of 
pada  tanggal  30  September  2019  dan  31  September 30, 2019 and December 31, 2018. 
Desember 2018. 
 
2. IKHTISAR KEBIJAKAN AKUNTANSI YANG   2. SUMMARY OF SIGNIFICANT ACCOUNTING
SIGNIFIKAN  POLICIES 
 

a. Pernyataan Kepatuhan a. Statement of Compliance

Laporan  keuangan  konsolidasian  Grup  disusun  dan  The  consolidated  financial  statements  of 
disajikan  sesuai  dengan  Standar  Akuntansi  the Group have been prepared and presented 
Keuangan  di  Indonesia  dan  peraturan  Pasar  Modal  in  accordance  to  Indonesian  Financial 
yang  berlaku  antara  lain  Peraturan  Otoritas  Jasa  Accounting  Standards  and  regulations  in 
Keuangan/  Badan  Pengawas  Pasar  Modal  the  Capital  Market  include  Regulations  of 
dan  Lembaga  Keuangan  (OJK/Bapepam-LK)  Financial  Services  Authority/  Capital  Market 
No.  VIII.G.7  tentang  Penyajian  dan  Pengungkapan  and  Supervisory  Board  and  Financial 
Laporan Keuangan Emiten atau Perusahan Publik. Institution  (OJK/Bapepam-LK)  No.  VIII.G.7 
regarding  presentation  and  disclosure  of 
financial  statements  of  the  issuer  or  public 
company. 
   
b. Dasar Pengukuran dan Penyusunan Laporan b. The Basis of Measurement and Preparation
Keuangan Konsolidasian  of Consolidated Financial Statements

Dasar  pengukuran  dalam  penyusunan  laporan  The  basic  measurement  in  the  preparation  of 
keuangan  konsolidasian  ini  adalah  konsep  biaya  these  consolidated  financial  statements  is 
perolehan  (historical  cost),  kecuali  untuk  akun  aset  the  historical  cost  method,  except  for 
tetap  yang  telah  dinilai  kembali  (revaluasi)  di  tahun  the  revaluation  of  fixed  assets  in  year  2000, 
2000,  investasi  dalam  efek  tertentu  yang  dicatat  investments  in  shares  of  stock  which  are 
sebesar  nilai  wajarnya  atau  dicatat  menggunakan  carried at its fair value or accounted for under 
metode  ekuitas,  persediaan  yang  dinyatakan  the  equity  method,  and  inventories  which 
sebesar  nilai  yang  lebih  rendah  antara  harga  are  carried  at  the  lower  of  cost  and  net 

21
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
perolehan dan nilai realisasi bersih (the lower of cost  realizable  value.  The  consolidated  financial 
or  net  realizable  value).  Laporan  keuangan  statements  are  prepared  based  on  going 
konsolidasian  disusun  berdasarkan  asumsi  concern  using  the  accrual  method,  except  for 
kelangsungan  usaha  serta  menggunakan  metode  the consolidated statements of cash flows.
akrual kecuali untuk laporan arus kas konsolidasian.
   
Laporan  arus  kas  konsolidasian  disusun  dengan  The  statements  of  cash  flows  are  prepared 
menggunakan  metode  langsung  (direct  method)  using  the  direct  method  by  classifying  cash 
dengan  mengelompokkan  arus  kas  ke  dalam  flows  into  operating,  investing  and  financing 
aktivitas operasi, investasi dan pendanaan.  activities. 

Mata  uang  penyajian  yang  digunakan  dalam  The  presentation  currency  used  in                     
penyusunan  laporan  keuangan  konsolidasian  ini  the  preparation  of  the  consolidated  financial 
adalah  Rupiah  (Rp)  yang  merupakan  mata  uang  statements is Indonesian Rupiah (Rp) which is 
fungsional  Grup.  Setiap  entitas  di  dalam  Grup  the  functional  currency  of  the  Group.  Each 
menetapkan  mata  uang  fungsional  sendiri  dan  entity  in  the  Group  determines  its  own 
unsur-unsur  dalam  laporan  keuangan  konsolidasian  functional  currency  and  items  included  in 
dari  setiap  entitas  diukur  berdasarkan  mata  uang  the  consolidated  financial  statements  of  each 
fungsional tersebut.  entity  are  measured  using  that  functional 
currency. 

c. Prinsip-prinsip Konsolidasian  c. Principles of Consolidation 


   
Laporan keuangan konsolidasian mencakup laporan  The  consolidated  financial  statements 
keuangan  Perusahaan  dan  entitas-entitas  anak  incorporate  the  financial  statements  of 
seperti disebutkan pada Catatan 1.b.   the Company and its subsidiaries as described 
  in Note 1.b. 
   
Entitas  anak  adalah  entitas  yang  dikendalikan  oleh  A  subsidiary  is  an  entity  controlled  by 
Grup, yakni Grup terekspos, atau memiliki hak, atas  the  Group,  i.e.  the  Group  is  exposed,  or  has 
imbal  hasil  variabel  dari  keterlibatannya  dengan  rights,  to  variable  returns  from  its  involvement 
entitas  dan  memiliki  kemampuan  untuk  with the entity and has the ability to affect those 
mempengaruhi  imbal  hasil  tersebut  melalui  returns  through  its  current  ability  to  direct 
kemampuan  kini  untuk  mengarahkan  aktivitas  the  entity’s  relevant  activities  (power  over 
relevan dari entitas (kekuasaan atas investee).  the investee). 
   
Keberadaan  dan  dampak  dari  hak  suara  potensial  The  existence  and  effect  of  substantive 
dimana  Grup  memiliki  kemampuan  praktis  potential  voting  rights  where  the  Group  has 
untuk  melaksanakan  (yakni  hak  substantif)  the  practical  ability  to  execute  (i.e.  substantive 
dipertimbangkan  saat  menilai  apakah  Grup  rights) are considered when assessing whether 
mengendalikan entitas lain.  the Group controls another entity. 
   
Laporan  keuangan  konsolidasian  Grup  mencakup  The  Group’s  consolidated  financial  statements 
hasil  usaha,  arus  kas,  aset  dan  liabilitas  dari  incorporate  the  results,  cash  flows,  assets  and 
Perusahaan  dan  seluruh  entitas  anak  yang  secara  liabilities  of  the  Company  and  all  of  its 
langsung  dan  tidak  langsung  dikendalikan  oleh  subsidiaries  are  directly  and  indirectly 
Perusahaan.  Entitas  anak  dikonsolidasikan  sejak  controlled.  Subsidiaries  are  consolidated  from 
tanggal  efektif  akuisisi,  yaitu  tanggal  dimana  Grup  the  effective  date  of  acquisition,  which  is 
secara efektif memperoleh pengendalian atas bisnis  the date on which the Group effectively obtains 
yang  diakuisisi,  sampai  tanggal  kehilangan  control of the acquired business, until that loses 
pengendalian.  control. 
   
Entitas  induk  menyusun  laporan  keuangan  A  parent  prepares  consolidated  financial 
konsolidasian  dengan  menggunakan  kebijakan  statements  using  uniform  accounting  policies 
akuntansi  yang  sama  untuk  transaksi  dan  peristiwa  for  transactions  and  other  events  in  similar 
lain dalam keadaan yang serupa. Seluruh transaksi,  circumstances.  All  intragroup  transactions, 
saldo, penghasilan, beban, dan arus kas dalam intra  balances,  income,  expenses  and  cash  flows 
kelompok  usaha  terkait  dengan  transaksi  antar  relating  to  transaction  between  entities  of 
entitas dalam grup dieliminasi secara penuh.  the group are fully eliminated. 
   
Grup  mengatribusikan  laba  rugi  dan  setiap  The  Group  attributes  the  profit  and  loss  and 
komponen  dari  penghasilan  komprehensif  lain  each  component  of  other  comprehensive 
kepada  pemilik  entitas  induk  dan  kepentingan  non- income  to  the  owners  of  the  parent  and  non-
pengendali  meskipun  hal  tersebut  mengakibatkan  controlling  interest  even  though  this  results  in 

22
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
kepentingan  non-pengendali  memiliki  saldo  defisit.  the  non-controlling  interests  having  a  deficit 
Grup  menyajikan  kepentingan  non-pengendali  di  balance.  The  Group  presents  non-controlling 
ekuitas  dalam  laporan  posisi  keuangan  interest  in  equity in  the consolidated statement 
konsolidasian,  terpisah  dari  ekuitas  pemilik  entitas  of  financial  position,  separately  from  the  equity 
induk.   owners of the parent. 
   
Perubahan  dalam  bagian  kepemilikan  entitas  induk  Changes in the parent’s ownership interest in a 
pada  entitas  anak  yang  tidak  mengakibatkan  subsidiary  that  do  not  result  in  loss  of  control 
hilangnya  pengendalian  adalah  transaksi  ekuitas  are  equity  transactions  (i.e.  transactions  with 
(yaitu  transaksi  dengan  pemilik  dalam  kapasitasnya  owners  in  their  capacity  as  owners).  When 
sebagai  pemilik).  Ketika  proporsi  ekuitas  yang  the  proportion  of  equity held by  non-controlling 
dimiliki  oleh  kepentingan  non-pengendali  berubah,  interest  change,  the  Group  adjusts
Grup  menyesuaikan  jumlah  tercatat  kepentingan  the  carrying  amounts  of  the  controlling  interest 
pengendali  dan  kepentingan  non-pengendali  untuk  and  non-controlling  interest  to  reflect 
mencerminkan  perubahan  kepemilikan  relatifnya  the  changes  in  their  relative  interest  in 
dalam  entitas  anak.  Selisih  antara  jumlah  dimana  the  subsidiaries.  Any  difference  between 
kepentingan  non-pengendali  disesuaikan  dan  nilai  the  amount  by  which  the  non-controlling 
wajar  dari  jumlah  yang  diterima  atau  dibayarkan  interests  are  adjusted  and  the  fair  value  of 
diakui  langsung  dalam  ekuitas  dan  diatribusikan  the consideration paid or received is recognized 
pada pemilik dari entitas induk.  directly in equity and attributed to the owners of 
the parent. 
   
Jika Grup kehilangan pengendalian, maka Grup:  If the Group loses control, the Group: 
   
(a)  Menghentikan  pengakuan  aset  (termasuk  (a)  Derecognizes  the  assets  (including 
goodwill) dan liabilitas entitas anak pada jumlah  goodwill) and liabilities of the subsidiary at 
tercatatnya ketika pengendalian hilang;  their  carrying  amounts  at  the  date  when 
control is lost; 
 
(b)  Menghentikan pengakuan jumlah tercatat setiap  (b)  Derecognizes  the  carrying  amount  of  any 
kepentingan  non-pengendali  pada  entitas  anak  non-controlling  interests  in  the  former 
terdahulu  ketika  pengendalian  hilang  (termasuk  subsidiary  at  the  date  when  control  is  lost 
setiap komponen penghasilan komprehensif lain  (including  any  components  of  other 
yang  diatribusikan  pada  kepentingan  non- comprehensive  income  attributable  to 
pengendali);  them); 
 
(c)  Mengakui nilai wajar pembayaran yang diterima  (c)  Recognizes  the  fair  value  of 
(jika ada) dari transaksi, peristiwa, atau keadaan  the  consideration  received,  (if  any)  from 
yang mengakibatkan hilangnya pengendalian;  the  transaction,  event  or  circumstances 
that resulted in the loss of control; 
 
(d)  Mengakui  sisa  investasi  pada  entitas  anak  (d)  Recognizes  any  investment  retained  in 
terdahulu  pada  nilai  wajarnya  pada  tanggal  the  former  subsidiary  at  fair  value  at 
hilangnya pengendalian;  the date when control is lost; 
 
(e)  Mereklasifikasi  ke  laba  rugi,  atau  mengalihkan  (e)  Reclassifies  to  profit  or  loss,  or  transfer 
secara  langsung  ke  saldo  laba  jika  disyaratkan  directly  to  retained  earnings  if  required  by 
oleh  SAK  lain,  jumlah  yang  diakui  dalam  other  FAS’s,  the  amount  recognized  in 
penghasilan  komprehensif  lain  dalam  kaitan  other  comprehensive  income in  relation  to 
dengan entitas anak; dan  the subsidiary; and 
 
(f)  Mengakui  perbedaan  apapun  yang  dihasilkan  (f)  Recognizes  any  resulting  difference  as  a 
sebagai  keuntungan  atau  kerugian  dalam  laba  gain or loss attributable to the parent. 
rugi yang diatribusikan kepada entitas induk. 

d. Penerapan Standar Akuntansi Keuangan Baru d. Adoption of New and Revised Statements
dan Revisi (PSAK) dan Intrepretasi Standar of Financial Accounting Standards (PSAK)
Akuntansi Keuangan (ISAK)  and Interpretation of PSAK (ISAK) 

i. Amandemen/penyesuaian dan interpretasi i. Amendments/ improvements and


standar yang berlaku efektif pada tahun Interpretations to standards effective in
berjalan the current year
 
Standar  baru  dan  amandemen    standar   berikut  New  standard  and  amandement  to 
efektif  untuk  periode  yang  dimulai  pada  atau  standard effective  for  periods beginning  on 

23
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
setelah  tanggal  1  Januari  2019,  dengan  or  after  January  1,  2019,  with  early 
penerapan dini diperkenankan yaitu: application permitted are:
   
  ISAK  33,  Transaksi  Valuta  Asing  dan     ISAK  33,  Foreign  Currency 
Imbalan Dimuka.  Transactions  and  Advance
Consideration. 
 
  ISAK  34,  Ketidakpastian  dalam  Perlakuan    ISAK  34,  Uncertainty  Over  Income  Tax 
Pajak Penghasilan  Treatments  
   
  PSAK  22  (Penyesuaian  2018),    Kombinasi    PSAK 22 (Improvement 2018), Business 
Bisnis  Combination  
   
  PSAK  26  (Penyesuaian  2018),  "Biaya   PSAK  26  (Improvement  2018), 
Pinjaman"  “Borrowing Cost” 
   
  PSAK  46  (Penyesuaian  2018),  “Pajak    PSAK  46  (Improvement  2018),  “Income 
Penghasilan”  Taxes” 
   
  PSAK  66  (Penyesuaian  2018),  Pengaturan    PSAK  66  (Improvement  2018),  Joint 
Bersama   Arrangement 
     
  Amandemen  PSAK  24,  Imbalan    PSAK 24, Plan Amendment, Curtailment 
Kerja tentang Amendemen,  Kurtailmen,  atau  or Settlement 
Penyelesaian Program 
   
Implementasi  dari  standar-standar  tersebut  The implementation of the above standards 
tidak memiliki  dampak yang signifikan  terhadap  had  no  significant  effect  on  the  amounts 
jumlah yang dilaporkan di periode berjalan atau  reported  for  the  current  period  or  prior 
tahun sebelumnya.  financial year. 
   
ii. Standar dan interpretasi telah diterbitkan tapi ii. Standards and interpretations issued not
belum diterapkan yet adopted
   
Standar  dan  amandemen  standar  berikut  efektif  Standards  and  standard  amendments  are 
untuk  periode  yang  dimulai  pada  atau  setelah  effective  for  periods  beginning  on  or  after 
tanggal  1  Januari  2020,  dengan  penerapan  dini  January  1,  2020,  with  early  application 
diperkenankan yaitu:  permitted are: 
   
  PSAK  15  (amandemen),  Investasi  pada     PSAK  15  (amendment),  Investments  in 
Entitas  Asosiasi  dan  Ventura  Bersama  Associates  and  Joint  Ventures:  Long 
tentang  Kepentingan  Jangka  Panjang  pada  Term  Interest  in  Associate  and  Joint 
Entitas Asosiasi dan Ventura Bersama;  Ventures; 
   
  PSAK  62  (amandemen),  Kontrak  Asuransi-   PSAK  62  (amendment),  Insurance 
Menerapkan PSAK 71: Instrumen Keuangan  Contract:  Applying  PSAK  71:  Financial 
dengan PSAK 62: Kontrak Asuransi;  Instruments  with  PSAK  62:    insurance 
  Contracts; 
   
  PSAK 71, Instrumen Keuangan;    PSAK 71, Financial Instruments; 
   
  PSAK  71  (amandemen),  Instrumen    PSAK  71  (amendment),  Financial 
Keuangan  tentang  Fitur  Percepatan  Instruments:  on  Prepayment  Features 
Pelunasan dengan Kompensasi Negatif;  with Negative Compensation; 
   
  PSAK  72,  Pendapatan  dari  Kontrak  dengan    PSAK  72,  Revenue  from  Contracts  with 
Pelanggan; dan  Customers; and 
   
  PSAK 73, Sewa.    PSAK 73, Leases. 
   
Pada  saat  penerbitan  laporan  keuangan  interim  As  of  the  authorization  date  of  these 
konsolidasian,  Grup  masih  mempelajari  dampak  consolidated  interim  financial  statements, 
yang  mungkin  timbul dari  penerapan standar baru,  the Group is still evaluating the potential impact 
amandemen standar, dan interprestasi atas standar  of  these  new  standards,  amandments 
serta  pengaruhnya  pada  saat  laporan  keuangan  and  interprectations  of  standards  to 
interim konsolidasian.  the consolidated interim financial statements. 

24
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
e. Transaksi dan Penjabaran Laporan Keuangan e. Foreign Currency Transactions and
dalam Mata Uang Asing  Translation of Financial Statements 
   
Dalam  menyiapkan  laporan  keuangan  In  preparing  consolidated  financial  statements, 
konsolidasian,  Grup  mencatat  dengan  the  Group  record  by  using  the  currency  of 
menggunakan  mata  uang  dari  lingkungan  ekonomi  the  primary  economic  environment  where 
utama  di  mana  entitas  beroperasi  (“mata  uang  the  entity  operates  (“the  functional  currency”).                
fungsional”).  Mata  uang  fungsional  Grup  adalah  The functional currency of the Group is Rupiah 
Rupiah (Rp).  (Rp). 
   
Mata  uang  fungsional  Kantor  cabang  di  Dubai,  The  functional  currency  of  branch  office  in 
Malaysia  dan  Timor  Leste,  adalah  Arab  Emirat  Dubai,  Malaysia  and  Timor  Leste  are  Arab 
Dirham  (AED),  Saudi  Arab  Real  (SAR),  Ringgit  Emirat  Dirham  (AED),  Saudi  Arab  Real  (SAR), 
(MYR)  dan  Dolar  Amerika  Serikat  (USD).  Untuk  Ringgit (MYR) and United States Dollar (USD). 
tujuan  penyajian  laporan  keuangan  konsolidasian,  For  presentation  purposes  of  consolidated 
aset  dan  liabilitas  Kantor  cabang  di  Dubai  dan  financial  statements,  assets  and  liabilities  of 
Timor  Leste,  pada  tanggal  laporan  dijabarkan  ke  branches in Dubai and Timor Leste at reporting 
Rupiah  (Rp)  menggunakan  kurs  penutup  yang  date  are  translated  to  Rupiah  (Rp)  at              
berlaku  pada  tanggal  laporan  posisi  keuangan,  the  closing  rate  at  statement  of  financial 
sedangkan  pendapatan  dan  beban  dijabarkan  position date, while revenues and expenses are 
dengan  menggunakan  kurs  rata-rata.  Untuk  tujuan  translated using average rate for the period. For 
penggabungan,  laporan  keuangan  kantor  cabang  combining purposes, the financial statements of 
luar  negeri  dijabarkan  dalam  Rp  dengan  kurs  the  branch  office  are  translated  into  Rp  based 
Reuters,  sedangkan  kantor  cabang  Malaysia  dan  on  Reuters  Rate,  while  Malaysia  and  Timor 
Timor  Leste  menggunakan  mata  uang  Ringgit  dan  Leste  Branch  maintained in  Ringgit  and  United 
Dolar  Amerika  Serikat  (USD)  dengan  kurs  Bank  Stated  Dollar  (USD)  using  Bank  Indonesia  (BI) 
Indonesia  (BI).  Selisih  kurs  yang  dihasilkan  diakui  rate. All resulting exchange differences shall be 
dalam penghasilan komprehensif lain.  recognized in other comprehensive income. 
   
Dalam penyusunan laporan keuangan setiap entitas  In  preparing  the  financial  statements  of  each 
individual  grup,  transaksi  dalam  mata  uang  asing  individual  group  entity,  transactions  in 
selain  mata  uang  fungsional  entitas  (mata  uang  currencies  other  than  the  entity’s  functional 
asing)  diakui  pada kurs  yang  berlaku  pada tanggal  currency  (foreign currencies) are  recognized  at 
transaksi.  Pada  akhir  periode  pelaporan,  pos  the rates of exchange prevailing at the dates of 
moneter  dalam  mata  uang  asing  dijabarkan  ke  the transactions. At the end of reporting period, 
dalam  Rp  menggunakan  kurs  penutup,  yaitu  kurs  foreign  currency  monetary  items  are  translated 
tengah  BI  pada  30  September  2019  dan  to Rupiah using the closing rate, i.e middle rate 
31 Desember 2018 sebagai berikut:  of BI at September 30, 2019 and December 31, 
2018 as follows: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Dolar Amerika Serikat (USD)                               14.174                               14.481 U.S Dollar (USD)


Dolar Singapura (SGD)                               10,507                               10.489 Singapore Dollar (SGD)
Euro Eropa (EUR)                               15.500                               16.560 European Euro (EUR)
Ringgit Malaysia (MYR)                                 3.385                                 3.493 Malaysian Ringgit (MYR)
Riyal Arab Saudi (SAR)                                 3.779                                 3.859 Saudi Arabian Riyal (SAR)
Yen Jepang (JPY)                                    131                                    131 Japananese Yen (JPY)
 
Pos-pos  non  moneter  yang  diukur  pada  nilai  wajar   Non-monetary  items  carried  at  fair  value  that 
dalam  valuta  asing  dijabarkan  kembali  pada  kurs  are  denominated  in  foreign  currencies  are 
yang  berlaku  pada  tanggal  ketika  nilai  wajar  retranslated  at  the  rates  prevailing  at  the  date 
ditentukan.  Pos  nonmoneter  yang  diukur  dalam  when  the  fair  value  was  determined.  Non-
biaya  historis  dalam  valuta  asing  tidak  dijabarkan  monetary  items  that  are  measured  in  terms  of 
kembali.  historical  cost  in  a  foreign  currency  are  not 
retranslated. 
     
Selisih kurs atas pos moneter diakui dalam laba rugi   Exchange  differences  on  monetary  items  are 
pada periode saat terjadinya kecuali untuk:  recognized  in  profit  or  loss  in  the  period  in 
which they arise except for: 
     
  Selisih  kurs  atas  pinjaman  valuta  asing  yang     Exchange  differences  on  foreign  currency 
berkaitan  dengan  aset  dalam konstruksi  untuk  borrowings  relating  to  assets  under 

25
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
penggunaan  yang  produktif  di  masa  depan,  construction  for  future  productive  use, 
termasuk dalam biaya perolehan aset tersebut  which  are  included  in  the  cost  of  those 
ketika  dianggap  sebagai  penyesuaian  atas  assets  when  they  are  regarded  as  an 
biaya bunga atas pinjaman valuta asing.  adjustment  to  interest  costs  on  those 
foreign currency borrowing. 
     
  Selisih  kurs  atas  transaksi  yang  ditetapkan     Exchange  differences  on  transaction 
untuk  tujuan  lindung  nilai  risiko  valuta  asing  entered  into  in  order  to  hedge  certain 
tertentu.  foreign currency risks. 
     
  Selisih  kurs  atas  pos  moneter  piutang  atau     Exchange  differences  on  monetary  items 
utang  dari  kegiatan  usaha  luar  negeri  yang  receivable  from  or  payable  to  a  foreign 
penyelesaiannya tidak direncanakan atau tidak  operation  for  which  settlement  is  neither 
mungkin  terjadi  (membentuk  bagian  dari  planned  nor  likely  to  occur  (therefore 
investasi  bersih  dalam  kegiatan  usaha  luar  forming  part  of  the  net  investment  in 
negeri),  yang  pada  awalnya  diakui  pada  the  foreign  operation),  which  are 
penghasilan  komprehensif  lain  dan  recognized  initially  in  other  comprehensive 
direklasifikasi  dari  ekuitas  ke  laba  rugi  pada  income and reclassified from equity to profit 
pembayaran kembali pos moneter.  or  loss  on  repayment  of  the  monetary 
items. 
     
f. Transaksi dan Saldo dengan Pihak Berelasi  f. Related Party Transactions and Balances 
   
Pihak berelasi adalah orang atau entitas yang terkait  A  related  party  is  a  person  or  an  entity  that  is 
dengan entitas pelapor:  related to the reporting entity: 
   
a)  Orang  atau  anggota  keluarga  dekatnya    a)  A  person  or  a  close  member  of  that 
mempunyai  relasi  dengan  entitas  pelapor  jika  person’s  family  is  related  to  a  reporting 
orang tersebut:  entity if that person: 
     
i.  Memiliki  pengendalian  atau  pengendalian    i.  Has  control  or  joint  control  over                  
bersama atas entitas pelapor;  the reporting entity;  
 
ii.  Memiliki  pengaruh  signifikan  atas  entitas    ii.  Has  significant  influence  over       
pelapor; atau  the reporting entity; or 
     
iii.  Merupakan personil manajemen kunci entitas    iii.  Is  a  member  of  the  key  management 
pelapor  atau  entitas  induk  dari  entitas  personnel  of  the  reporting  entity  or  of  a 
pelapor.  parent of the reporting entity. 
     
b)  Suatu  entitas  berelasi  dengan  entitas  pelapor    b)  An entity is related to the reporting entity if 
jika memenuhi salah satu hal berikut:  any of the following conditions applies: 
     
i.  Entitas  dan  entitas  pelapor  adalah  anggota    i.  The  entity  and  the  reporting  entity  are 
dari  kelompok  usaha  yang  sama  (artinya  members  of  the  same  group  (which 
entitas induk, entitas anak, dan entitas anak  means that each parent, subsidiary and 
berikutnya  saling  berelasi  dengan  entitas  fellow  subsidiary  is  related  to               
lain);  the others); 
     
ii.  Satu  entitas  adalah  entitas  asosiasi  atau    ii.  One  entity  is  an  associate  or  joint 
ventura  bersama  dari  entitas  lain  (atau  venture  of  the  other  entity  (or  an 
entitas  asosiasi  atau  ventura  bersama  yang  associate  or  joint  venture  of  a  member 
merupakan  anggota  suatu  kelompok  usaha,  of a group of which the other entity is a 
yang  mana  entitas  lain  tersebut  adalah  member); 
anggotanya); 
     
iii.  Kedua  entitas  tersebut  adalah  ventura    iii.  Both  entities  are  joint  ventures  of  
bersama dari pihak ketiga yang sama;  the same third party; 
     
iv.  Satu  entitas  adalah  ventura  bersama  dari    iv.  One  entity  is  a  joint  venture  of  a  third 
entitas  ketiga  dan  entitas  yang  lain  adalah  entity  and  the  other  entity  is  an 
entitas asosiasi dari entitas ketiga;  associate of the third entity; 
     

26
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
v.  Entitas  tersebut  adalah  suatu  program    v.  The entity is a post-employment benefit 
imbalan pasca kerja untuk imbalan kerja dari  plan  for  the  benefit  of  employees  of 
salah  satu  entitas  pelapor  atau  entitas  yang  either  the  reporting  entity,  or  an  entity 
terkait  dengan  entitas  pelapor.  Jika  entitas  related  to  the  reporting  entity.  If    
pelapor  adalah  entitas  yang  the  reporting  entity  is  the  entity  that 
menyelenggarakan  program  tersebut,  maka  organized  the  plan,  the  sponsoring 
entitas sponsor juga berelasi dengan entitas  employers  are  also  related  to  the 
pelapor;  reporting entity;  
     
vi.  Entitas  yang  dikendalikan  atau  dikendalikan    vi.  The  entity  is  controlled  or  jointly 
bersama  oleh  orang  yang  diidentifikasi  controlled by a person identified in (a);  
dalam huruf (a); 
     
vii. Orang  yang  diidentifikasi  dalam  huruf  (a)  (i)    vii. A  person  identified  in  (a)  (i)  has 
memiliki  pengaruh  signifikan  atas  entitas  significant influence over the entity or is 
atau  merupakan  personil  manajemen  kunci  a  member  of  the  key  management 
entitas (atau entitas induk dari entitas); atau  personnel  of  the  entity  (or  a  parent  of    
the entity); or 
     
viii. Entitas,  atau  anggota  dari  kelompok  yang    viii. The entity, or any member of a group of 
mana  entitas  merupakan  bagian  dari  which  it  is  a  part,  provides  key 
kelompok  tersebut,  menyediakan  jasa  management  personnel  services  to        
personil  manajemen  kunci  kepada  entitas  the  reporting  entity  or  to  the  parent  of           
palapor  atau  kepada  entitas  induk  dari  the reporting entity. 
entitas pelapor. 
     
Entitas  yang  berelasi  dengan  pemerintah  adalah    A government-related entity is an entity that is 
entitas  yang  dikendalikan,  dikendalikan  bersama,  controlled,  jointly  controlled  or  significantly 
atau  dipengaruhi  oleh  pemerintah.  Pemerintah  influenced  by  the  government.  Government 
mengacu  kepada  pemerintah,  instansi  pemerintah  refers  to  government,  government  agencies 
dan  badan  yang  serupa  baik  lokal,  nasional  and  similar  bodies  whether  local,  national  or 
maupun internasional.  international. 
     
Entitas  yang  berelasi  dengan  Pemerintah  dapat    Government  related  entity  can  be  an  entity 
berupa  entitas  yang  dikendalikan  atau  dipengaruhi  that  is  controlled  or  significantly  influenced  by 
secara signifikan oleh Kementerian Keuangan atau  the  Ministry  of  Finance  or  Local  Government 
Pemerintah  Daerah  yang  merupakan  Pemegang  that represent the shareholders of the entity or 
Saham entitas, atau entitas yang dikendalikan oleh  an  entity  controlled  by  the  Government  of 
Pemerintah  Republik  Indonesia  melalui  Republic  of  Indonesia,  represented  by  
Kementerian  BUMN  sebagai  kuasa  pemegang  the  SOE’s  Ministry  as  a  shareholder’s 
saham.  representative. 
     
Transaksi  signifikan  yang  dilakukan  dengan  pihak-   Significant  transactions  with  related  parties, 
pihak  berelasi,  baik  dilakukan  dengan  kondisi  dan  whether  or  not  made  at  similar  terms  and 
persyaratan  yang  sama  dengan  pihak  ketiga  conditions as those done with third parties, are 
maupun  tidak,  diungkapkan  pada  laporan  disclosed  in  the  consolidated  financial 
keuangan konsolidasian (Catatan 5).  statements (Note 5). 
     
g. Instrumen Keuangan g. Financial Instrument

Pengakuan dan Pengukuran Awal Initial Recognition and Measurement

Grup  mengakui  aset  keuangan  atau  liabilitas    The  Group  recognizes  financial  assets  or 
keuangan  dalam  laporan  posisi  keuangan  financial  liabilities  in  the  consolidated 
konsolidasian,  jika  dan  hanya  jika,  Grup  menjadi  statement of  financial  position  when,  and  only 
salah  satu  pihak  dalam  ketentuan  pada  kontrak  when,  it  becomes  a  party  to  the  contractual 
instrumen  tersebut.  Pada  saat  pengakuan  awal  provisions  of  the  instrument.  At  initial 
aset  keuangan  atau  liabilitas  keuangan,  Grup  recognition,  the  Group  measures  all  financial 
mengukur  pada  nilai  wajarnya.  Dalam  hal  aset  assets and financial liabilites at its fair value. In 
keuangan  atau  liabilitas  keuangan  tidak  diukur  the case of a financial asset or financial liability 
pada  nilai  wajar  melalui  laba  rugi,  nilai  wajar  is  not  at  fair  value  through  profit  or  loss,  fair 
tersebut  ditambah  atau  dikurang  dengan  biaya  value plus  or minus with the transaction costs 
transaksi yang dapat diatribusikan secara langsung  that  are directly  attributtable  to  the  acquisition 
dengan  perolehan  atau  penerbitan  aset  keuangan  or  issue  of  the  financial  asset  or  financial 
atau  liabilitas  keuangan  tersebut.  Biaya  transaksi  liability.  Transaction  costs  incurred  on 

27
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
yang  dikeluarkan  sehubungan  dengan  perolehan  acquisition  of  a  financial  asset  and  issue  of  a 
aset  keuangan  dan  penerbitan  liabilitas  keuangan  financial liability classified at fair value through 
yang  diklasifikasikan  pada  nilai  wajar  melalui  laba  profit or loss are expensed immediately. 
rugi dibebankan segera. 
 
Pengukuran Selanjutnya Aset Keuangan    Subsequent Measurement of Financial
Assets 
 
Pengukuran selanjutnya aset keuangan tergantung  Subsequent  measurement  of  financial  assets 
pada  klasifikasinya  pada  saat  pengakuan  awal.  depends  on  their  classification  on  initial 
Grup  mengklasifikasikan  aset  keuangan  dalam  recognition.  The  Group  classifies  financial 
salah satu dari empat kategori berikut:  assets in one of the following four categories: 
     
(i)  Aset  Keuangan  yang  Diukur  pada  Nilai  Wajar  (i)  Financial  Assets  at  Fair  Value  Through 
Melalui Laba Rugi (FVTPL)  Profit or Loss (FVTPL) 
     
Aset  keuangan  yang  diukur  pada  FVTPL    Financial  assets  at  FVTPL  are  financial 
adalah  aset  keuangan  yang  dimiliki  untuk  assets  held  for  trading  or  upon  initial 
diperdagangkan  atau  yang  pada  saat  recognition  it  is  designated  as  to  be 
pengakuan awal telah ditetapkan untuk diukur  measured  at  fair  value  through  profit  or 
pada nilai wajar melalui laba rugi.  loss. 
 
Aset  keuangan  diklasifikasikan  dalam    Financial  asset  classified  as  held  for 
kelompok  diperdagangkan  jika  diperoleh  atau  trading if it is acquired or incurred mainly 
dimiliki terutama untuk tujuan dijual atau dibeli  for  the  purpose  of  selling  and 
kembali  dalam  waktu  dekat,  atau  bagian  dari  repurchasing it in the near term, or it is a 
portofolio  instrumen  keuangan  tertentu  yang  part  of  a  portfolio  of  identified  financial 
dikelola bersama dan terdapat bukti mengenai  instruments  that  are  managed  together 
pola ambil untung dalam jangka pendek aktual  and  for  which  there  is  evidence  of  an 
saat  ini,  atau  merupakan  derivatif,  kecuali  actual  recent  pattern  of  short-term  profit 
derivatif  yang  ditetapkan  dan  efektif  sebagai  taking,  or  it  is  a  derivative,  except  for  a 
instrumen lindung nilai.  derivative  that  is  a  designated  and 
effective hedging instrument. 
     
Setelah pengakuan awal, aset keuangan yang    After initial recognition, financial assets at 
diukur pada FVTPL diukur pada nilai wajarnya.  FVTPL  are  measured  at  its  fair  value. 
Keuntungan  atau  kerugian  yang  timbul  dari  Gains  or  losses  arising  from a  change  in 
perubahan  nilai  wajar  aset  keuangan  diakui  the  fair  value  of  financial  assets  are 
dalam laba rugi.  recognized in profit or loss. 
     
(ii)  Pinjaman yang Diberikan dan Piutang    (ii)  Loans and Receivables 
     
Pinjaman  yang  diberikan  dan  piutang  adalah    Loans and receivables are non-derivative 
aset  keuangan  non-derivatif  dengan  financial assets with fixed or determinable 
pembayaran  tetap  atau  telah  ditentukan  dan  payments that are not quoted in an active 
tidak  mempunyai  kuotasi  di  pasar  aktif,  market, other than: 
kecuali: 
 
(a)   Pinjaman  yang  diberikan  dan  piutang  (a)  Those  that  intend  to  sell  immediately 
yang  dimaksudkan  untuk  dijual  dalam  or  in  the  near  term  and  upon  initial 
waktu  dekat  dan  yang  pada  saat  recognition  designated  as  fair  value 
pengakuan  awal  ditetapkan  sebagai  aset  through profit or loss; 
keuangan  yang  diukur  pada  nilai  wajar   
melalui laba rugi; 
 
(b)   Pinjaman  yang  diberikan  dan  piutang  (b)  Those  for  which  the  holder  may  not 
dalam  hal  pemilik  mungkin  tidak  akan  recover  substantially  all  of  its  initial 
memperoleh  kembali  investasi  awal  investment,  other  than  because  of 
secara  substansial  kecuali  yang  decrease in loan quality; or 
disebabkan  oleh  penurunan  kualitas 
pinjaman; atau 
 
(c)   Pinjaman  yang  diberikan  dan  piutang    (c)  Those  that  upon  initial  recognition 
yang  pada  saat  pengakuan  awal  designated as available for sale. 
ditetapkan sebagai tersedia untuk dijual. 
     

28
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Setelah  pengakuan  awal,  pinjaman  yang    After  initial  recognition,  loans  and 
diberikan  dan  piutang  diukur  pada  biaya  receivables  are  measured  at  amortized 
perolehan  diamortisasi  dengan  menggunakan  cost using the effective interest method. 
metode suku bunga efektif. 
     
Pada  30  September  2019  dan  31  Desember    As of September 30, 2019 and December 
2018,  Grup  mempunyai  kas  dan  setara  kas,  31,  2018,  the  Group  has  cash  and  cash 
piutang  usaha,  piutang  retensi,  piutang  lain- equivalents,  accounts  receivable, 
lain,  tagihan  bruto  dan  aset  keuangan  atas  retention  receivables,  other  receivables, 
proyek  konsesi  kepada  pengguna  jasa  yang  gross  amount  due  from  customers  and 
diklasifikasikan  sebagai  pinjaman  yang  financial  assets  from  concession  project 
diberikan dan piutang.  which  were  classified  as  loans  and 
receivables. 
     
(iii)  Investasi Dimiliki Hingga Jatuh Tempo (HTM)    (iii)  Held-to-Maturity (HTM) Investments 
     
Investasi  HTM  adalah  aset  keuangan  non-   HTM  investments  are  non-derivative 
derivatif  dengan  pembayaran  tetap  atau  telah  financial assets with fixed or determinable 
ditentukan  dan  jatuh  temponya  telah  payments  and  fixed  maturity  that  
ditetapkan,  serta  Grup  mempunyai  intensi  the  Group  has  the  positive  intention  and 
positif  dan  kemampuan  untuk  memiliki  aset  ability to hold to maturity.  
keuangan tersebut hingga jatuh tempo.  
     
Setelah  pengakuan  awal,  investasi  HTM    After  initial  recognition,  HTM  investments 
diukur  pada  biaya  perolehan  diamortisasi  are  measured  at  amortized  cost  using  
dengan  menggunakan  metode  suku  bunga  the effective interest method (Note 15). 
efektif (Catatan 15). 
     
(iv)  Aset Keuangan Tersedia Untuk Dijual (AFS)    (iv)  Available-for-Sale (AFS) Financial Assets 
     
Aset  keuangan  AFS  adalah  aset  keuangan  AFS  financial  assets  are  non-derivative 
non-derivatif yang ditetapkan sebagai tersedia  financial  assets  that  are  designated            
untuk  dijual  atau  yang  tidak  diklasifikasikan  as  available  for  sale  on initial  recognition 
sebagai  (a)  pinjaman  yang  diberikan  dan  or  are  not  classified  as  (a)  loans                 
piutang,  (b)  investasi  yang  diklasifikasikan  and  receivable,  (b)  held-to-maturity 
dalam  kelompok  dimiliki  hingga  jatuh  tempo,  investment,  or  (c)  financial  assets  at  fair 
atau (c) aset keuangan yang diukur pada nilai  value through profit or loss. 
wajar melalui laba rugi.  
   
Setelah pengakuan  awal, aset keuangan AFS  After  initial  recognition,  AFS  financial 
diukur  pada  nilai  wajarnya.  Keuntungan  atau  assets  are  measured  at  its  fair  value. 
kerugian  yang  timbul  dari  perubahan  nilai  Gains  or  losses  arising  from a  change  in 
wajar  diakui  dalam  penghasilan  komprehensif  the  fair  value  is  recognized  on  other 
lain,  kecuali  untuk  kerugian  penurunan  nilai  comprehensive  income,  except  for 
dan  keuntungan  atau  kerugian  akibat  impairment  losses  and  foreign  exchange 
perubahan  kurs,  sampai  aset  keuangan  gains  or  losses,  until  the  financial               
tersebut  dihentikan pengakuannya.  Pada  saat  assets  is  unrecognized.  At  that  time,              
itu,  keuntungan  atau  kerugian  kumulatif  yang  the cumulative gains or losses previously 
sebelumnya  diakui  dalam  penghasilan  recognized  in  other  comprehensive 
komprehensif  lain  direklasifikasi  dari  ekuitas  income shall be reclassified from equity to 
ke laba rugi sebagai penyesuaian reklasifikasi.  profit  or  loss  as  a  reclassification 
adjustment. 
     
Investasi  dalam  instrumen  ekuitas  yang  tidak    Investment  in  equity  instruments  that  do 
memiliki  harga  kuotasian  di  pasar  aktif  dan  not  have  a  quoted  market  price  in  an 
nilai wajarnya tidak dapat diukur secara andal  active  market  and  whose  fair  value 
diukur pada biaya perolehan.  cannot  be  reliably  measured  are 
  measured at cost. 
     
Pada  30  September  2019  dan  31  Desember  As of September 30, 2019 and December 
2018,  Grup  tidak  mempunyai  aset  keuangan  31,  2018,  the  Group  has  no  financial 
yang  diklasifikasikan sebagai  investasi saham  assets classified as stock investments are 
diukur dengan metode biaya.  measured using the cost method. 
 

29
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pengukuran Selanjutnya Liabilitas Keuangan Subsequent Measurement of Financial
Liabilities
     
Pengukuran  selanjutnya  liabilitas  keuangan    Subsequent  measurement  of  financial 
tergantung  pada  klasifikasinya  pada  saat  liabilities  depends  on  their  classification  on 
pengakuan  awal.  Grup  mengklasifikasikan  liabilitas  initial  recognition.  The  Group  classifies 
keuangan dalam salah satu dari kategori berikut:  financial  liabilities  into  one  of  the  following 
categories: 
 
(i)  Liabilitas  Keuangan  yang  Diukur  pada  Nilai  (i)  Financial  Liabilities  at  Fair  Value  Through 
Wajar Melalui Laba Rugi (FVTPL)  Profit or Loss (FVTPL) 
     
Liabilitas  keuangan  yang  diukur  pada  FVTPL  Financial  liabilities  at  FVTPL  are  financial 
adalah  liabilitas  keuangan  yang  dimiliki  untuk  liabilities  held  for  trading  or  upon  initial 
diperdagangkan  atau  yang  pada  saat  recognition  it  is  designated  as  at  fair  value 
pengakuan  awal  telah  ditetapkan  untuk  diukur  through  profit  or  loss.  Financial  liabilities 
pada  nilai  wajar  melalui  laba  rugi.  Liabilitas  classified as held for trading if it is acquired 
keuangan  diklasifikasikan  dalam  kelompok  or incurred mainly for the purpose of selling 
diperdagangkan  jika  diperoleh  atau  dimiliki  and repurchasing it in the near term, or it is 
terutama  untuk  tujuan  dijual  atau  dibeli  kembali  a  part  of  a  portfolio  of  identified  financial 
dalam  waktu  dekat,  atau  bagian  dari  portfolio  instruments that are managed together and 
instrumen  keuangan  tertentu  yang  dikelola  for  which  there  is  evidence  of  an  actual 
bersama  dan  terdapat  bukti  mengenai  pola  recent pattern of short-term profit taking, or 
ambil  untung  dalam  jangka  pendek  aktual  saat  it is a derivative, except for a derivative that 
ini,  atau  merupakan  derivatif,  kecuali  derivatif  is  a  designated  and  effective  hedging 
yang  ditetapkan  dan  efektif  sebagai  instrumen  instrument. 
lindung nilai. 
     
Setelah  pengakuan  awal,  liabilitas  keuangan    After initial recognition, financial liabilities at 
yang  diukur  pada  FVTPL  diukur  pada  nilai  FVTPL  are  measured  at  its  fair  value. 
wajarnya.  Keuntungan  atau  kerugian  yang  Gains  or  losses  arising  from  a  change  in 
timbul  dari  perubahan  nilai  wajar  diakui  dalam  the  fair  value  are  recognized  in  profit  or 
laba rugi.  loss. 
     
(ii)  Liabilitas  keuangan  pada  biaya  perolehan    (ii)  Financial liabilities at amortized cost 
diamortisasi 
     
Liabilitas  keuangan  meliputi  utang  usaha  dan    Financial  liabilities,  which  include  accounts 
lainnya,  utang  bruto  subkontraktor,  utang  bank,  payables,  gross  amount  due  to  third 
utang  lembaga  keuangan  non-bank,  biaya  parties,  bank  loan,  loan  to  financial 
jangka  panjang  yang  masih  harus  dibayar  dan  institution non-bank, accrued expenses and 
utang  lain-lain  pada  awalnya  diukur  pada  nilai  other  payables  –  long  term  are  initially 
wajar,  setelah  dikurangi  biaya  transaksi,  dan  measured  at  fair  value,  net  of  transaction 
selanjutnya  diukur  pada  biaya  perolehan  yang  costs,  and  subsequently  measured  at 
diamortisasi  menggunakan  metode  suku  bunga  amortized  cost  using  the  effective  interest 
efektif.  method. 
     
Penghentian Pengakuan Aset dan Liabilitas Derecognition of Financial Assets and
Keuangan Liabilities

Grup menghentikan pengakuan aset keuangan, jika    The  Group  derecognizes  a  financial  asset 


dan hanya jika, hak kontraktual atas arus kas yang  when,  and  only  when  the  contractual  rights  to           
berasal  dari  aset  keuangan  berakhir  atau  Grup  the  cash  flows  from  the  financial  asset  expire 
mengalihkan  hak  kontraktual  untuk  menerima  kas  or the Group transfers the contractual rights to 
yang berasal dari aset keuangan atau tetap memiliki  receive the cash flows of the financial asset or 
hak  kontraktual  untuk  menerima  kas  tetapi  juga  retains  the  contractual  rights  to  receive        
menanggung  kewajiban  kontraktual  untuk  the  cash  flows  but  assumes  a  contractual 
membayar  arus kas  yang  diterima tersebut  kepada  obligation to pay the cash flows to one or more 
satu  atau  lebih  pihak  penerima  melalui  suatu  recipients  in  an  arrangement.  If  the  Group 
kesepakatan.  Jika  Grup  secara  substansial  transfers substantially all the risks and rewards 
mengalihkan  seluruh  risiko  dan  manfaat  atas  of  ownership  of  the  financial  asset,  the  Group 
kepemilikan  aset  keuangan,  maka  Grup  derecognizes  the  financial  asset  and 
menghentikan  pengakuan  aset  keuangan  dan  recognizes  separately  as  an  asset  or  for  right 
mengakui  secara  terpisah  sebagai  aset  atau  liabilities and obligations created or retained in 
liabilitas  untuk  setiap  hak  dan  kewajiban  yang  the  transfer.  If  the  Group  neither  transfers  nor 
timbul  atau  yang  masih  dimiliki  dalam  pengalihan  retains substantially all the risks and rewards of 

30
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
tersebut.  Jika  Grup  secara  substansial  tidak  ownership of the financial asset and still retains 
mengalihkan  dan  tidak  memiliki  seluruh  risiko  dan  control,  the  Group  continues  to  recognize  
manfaat  atas  kepemilikan  aset  keuangan  tersebut  the financial asset to the extent of its continuing 
dan  masih  memiliki  pengendalian,  maka  Grup  involvement in the financial asset. If the Group 
mengakui  aset  keuangan  sebesar  keterlibatan  retains substantially all the risks and rewards of 
berkelanjutan dengan aset keuangan tersebut. Jika  ownership  of  the  financial  assets,  the  Group 
Grup  secara  substansial  masih  memiliki  seluruh  continues to recognize the financial asset. 
risiko dan manfaat atas kepemilikan aset keuangan, 
maka Grup tetap mengakui aset keuangan tersebut. 
     
Grup  menghentikan  pengakuan  liabilitas  keuangan,    The Group removes a financial liability from its 
jika  dan  hanya  jika,  liabilitas  keuangan  tersebut  statement  of  financial  position  when,  and  only 
berakhir,  yaitu  ketika  kewajiban  yang  ditetapkan  when, it is extinguished, ie when the obligation 
dalam  kontrak  dilepaskan  atau  dibatalkan  atau  specified  in  the  contract  is  discharged  or 
kedaluwarsa.  cancelled or expired. 
     
Penurunan Nilai Aset Keuangan Impairment of Financial Assets
Pada  setiap  akhir  periode  pelaporan,  Grup    At the end of each reporting period, the Group 
mengevaluasi apakah terdapat bukti objektif bahwa  assesses  whether  there  is  any  objective 
aset  keuangan  atau  kelompok  aset  keuangan  evidence  that  a  financial  asset  or  a  group  of 
mengalami  penurunan  nilai.  Aset  keuangan  atau  financial assets is impaired. A financial asset or 
kelompok  aset  keuangan  diturunkan  nilainya  dan  a  group  of  financial  assets  is  impared  and 
kerugian  penurunan  nilai  telah  terjadi,  jika  dan  impairment  losses  are  incurred,  if  and  only  if, 
hanya  jika,  terdapat  bukti  objektif  mengenai  there is objective  evidence  of  impairment  as  a 
penurunan  nilai  tersebut  sebagai  akibat  dari  satu  result of one or more events that occured after 
atau lebih peristiwa yang terjadi setelah pengakuan  the  initial  recognition  of  the  asset  (loss  event), 
awal aset  tersebut (peristiwa yang  merugikan), dan  and  that  loss  event  has  an  impact  on               
peristiwa yang merugikan tersebut berdampak pada  the estimated future cash flows of the financial 
estimasi  arus  kas  masa  depan  dari  aset  keuangan  asset  or  group  of  financial  assets  that  can  be 
atau  kelompok  aset  keuangan  yang  dapat  reliably estimated. 
diestimasi secara andal. 
 
Berikut  adalah  bukti  objektif  bahwa  aset  keuangan    The  following  are  objective  evidence  that  a 
atau  kelompok  aset  keuangan  mengalami  financial  asset  or  group  of  financial  assets  is 
penurunan nilai:  impaired: 
     
(a)  Kesulitan  keuangan  signifikan  yang  dialami    (a)  Significant financial difficulty of the issuer 
penerbit atau pihak peminjam;  or obligor; 
     
(b)  Pelanggaran  kontrak,  seperti  terjadinya  gagal    (b)  A  breach  of  contract,  such  as  default  or 
bayar atau tunggakan pembayaran pokok atau  delinquency  in  interest  or  principal 
bunga;  payments; 
     
(c)  Terdapat kemungkinan bahwa pihak peminjam    (c)  It  is  probable  that  the  borrower  will  enter 
akan  dinyatakan  pailit  atau  melakukan  bankruptcy  or  other  financial 
reorganisasi keuangan lainnya; atau  reorganization; or 

(d)  Hilangnya pasar aktif dari aset keuangan akibat    (d)  The  disappearance  of  an  active  market 


kesulitan keuangan.  for  that  financial  asset  because  of 
financial difficulties. 
     
Untuk investasi pada instrumen ekuitas, penurunan    For  investment  in  equity  instrument,  a 
yang  signifikan  atau  penurunan  jangka  panjang  significant or prolonged decline in the fair value 
dalam nilai  wajar instrumen ekuitas di bawah biaya  of  the  equity  instrument  below  its  cost  is  an 
perolehannya  merupakan  bukti  objektif  terjadinya  objective evidence of impairment. 
penurunan nilai. 
     
Jika  terdapat  bukti  objektif  bahwa  kerugian    If  there  is  objective  evidence  that  an 
penurunan  nilai  telah  terjadi  atas  pinjaman  yang  impairment  loss  has  been  incurred  on  loans 
diberikan  dan  piutang atau  investasi  dimiliki hingga  and  receivable  or  held-to-maturity  investments 
jatuh  tempo  yang  dicatat  pada  biaya  perolehan  carried  at  amortized  cost,  the  amount  of 
diamortisasi,  maka  jumlah  kerugian  tersebut  diukur  impairment loss is  measured as  the difference 
sebagai selisih antara jumlah tercatat aset dan nilai  between  the  carrying  amount  of  the  financial 
kini estimasi arus kas masa depan yang didiskonto  asset and the present value of estimated future 
menggunakan  suku  bunga  efektif  awal  dari  aset  cash  flows  discounted  at  the  financial  asset’s 
tersebut dan diakui pada laba rugi.  original effective interest rate and recognized in 
profit or loss. 

31
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Jika  penurunan  dalam  nilai  wajar  atas  aset    When a decline in the fair value of an available-
keuangan  tersedia  untuk  dijual  telah  diakui  dalam  for-sale financial asset has been recognized in 
penghasilan  komprehensif  lain  dan  terdapat  bukti  other  comprehensive  income  and  there  is 
objektif bahwa aset tersebut mengalami penurunan  objective  evidence  that  the  asset  is  impaired, 
nilai,  maka  kerugian  kumulatif  yang  sebelumnya  the  cumulative  loss  that  had  been  recognized 
diakui  dalam  penghasilan  komprehensif  lain  in  other  comprehensive  income  shall  be 
direklasifikasi  dari  ekuitas  ke  laba  rugi  sebagai  reclassified  from  equity  to  profit  or  loss  as  a 
penyesuaian  reklasifikasi  meskipun  aset  keuangan  reclassification  adjustment  even  though        
tersebut  belum  dihentikan  pengakuannya.  Jumlah  the  financial  assets  has  not  been 
kerugian kumulatif yang direklasifikasi adalah selisih  derecognized.  The  amount  of  the  cumulative 
antara  biaya  perolehan  (setelah  dikurangi  loss  that  is  reclassified  are  the  difference 
pelunasan  pokok  dan  amortisasi)  dan  nilai  wajar  between  the  acquisition  cost  (net  of  any 
kini,  dikurangi  kerugian  penurunan  nilai  aset  principal  repayment  and  amortisation)  and 
keuangan yang sebelumnya telah diakui dalam laba  current  fair  value,  minus  any  impairment  loss 
rugi.  on that financial asset previously recognized in 
profit or loss. 
     
Metode Suku Bunga Efektif The Effective Interest Method

Metode  suku  bunga  efektif  adalah  metode  yang    The  effective  interest  method  is  a  method  of 
digunakan  untuk  menghitung  biaya  perolehan  calculating  the  amortized  cost  of  a  financial 
diamortisasi dari aset atau liabilitas keuangan (atau  asset or a financial liability (or group of financial 
kelompok aset atau liabilitas keuangan) dan metode  assets  or  financial  liabilities)  and  of  allocating 
untuk  mengalokasikan  pendapatan  bunga  atau  the  interest  income  or  interest  expense  over 
beban  bunga  selama  periode  yang  relevan.  Suku  the  relevant  period.  The  effective  interest  rate 
bunga efektif adalah suku bunga yang secara tepat  is  the  rate  that  exactly  discounts  estimated 
mendiskontokan  estimasi  pembayaran  atau  future  cash  payments  or  receipts  through         
penerimaan  kas  masa  depan  selama  perkiraan  the expected life of the financial instrument or, 
umur dari instrumen keuangan, atau jika lebih tepat,  when  appropriate,  a  shorter  period  to  the  net 
digunakan  periode  yang  lebih  singkat  untuk  carrying  amount  of  the  financial  asset  or 
memperoleh  jumlah  tercatat  neto  dari  aset  financial liability. When calculating the effective 
keuangan  atau  liabilitas  keuangan.  Pada  saat  interest  rate,  the  Group  estimates  cash  flows 
menghitung suku bunga efektif, Grup mengestimasi  considering  all  contractual  terms  of                  
arus  kas  dengan  mempertimbangkan  seluruh  the  financial  instrument,  for  example, 
persyaratan kontraktual dalam instrumen keuangan  prepayment,  buy  option  or  other  similar 
tersebut,  seperti  pelunasan  dipercepat,  opsi  beli  options,  but  does  not  consider  future  credit 
dan  opsi  serupa  lain,  tetapi  tidak  losses.  The  calculation  includes  all  fees  and 
mempertimbangkan  kerugian  kredit  masa  depan.  points  paid  or  received  between  parties  under                 
Perhitungan  ini  mencakup  seluruh  komisi  dan  the  contract  that  are  an  integral  part  of           
bentuk  lain  yang  dibayarkan  atau  diterima  oleh  the  effective  interest  rate,  transaction  costs, 
pihak-pihak dalam kontrak yang merupakan bagian  and all other premiums or discounts.  
takterpisahkan  dari  suku  bunga  efektif,  biaya 
transaksi, dan seluruh premium atau diskonto lain. 

Reklasifikasi Reclassification

Grup  tidak  mereklasifikasi  derivatif  yang  diukur    The  Group  shall  not  reclassify  a  derivative  out 
pada  nilai  wajar  melalui  laba  rugi  selama  derivatif  of  the  fair value  through  profit  or  loss category 
tersebut  dimiliki  atau  diterbitkan  dan  tidak  while it is held or issued and not reclassify any 
mereklasifikasi  setiap  instrumen  keuangan  dari  financial instrument out of the fair value through 
diukur  melalui  laba  rugi  jika  pada  pengakuan  awal  profit or loss category  if upon initial recognition 
instrumen  keuangan  tersebut  ditetapkan  oleh  Grup  it was designated by the Group as at fair value 
sebagai  diukur  pada  nilai  wajar  melalui  laba  rugi.  through  profit  or  loss.  The  Group  may 
Grup  dapat  mereklasifikasi  aset  keuangan  yang  reclassifiy  that  financial  asset  out  of  the  fair 
diukur  pada  nilai  wajar  melalui  laba  rugi,  jika  aset  value  through  profit  or  loss  category  if  a 
keuangan  tidak  lagi  dimiliki  untuk  tujuan  penjualan  financial asset is no longer held for the purpose 
atau  pembelian  kembali  aset  keuangan  tersebut  of  selling  or  repurchasing  it  in  the  near  term. 
dalam  waktu  dekat.  Grup  tidak  mereklasifikasi  The  Group  shall  not  reclassify  any  financial 
setiap  instrumen  keuangan  ke  diukur  pada  nilai  instrument  into  the  fair  value  through  profit  or 
wajar melalui laba rugi setelah pengakuan awal.   loss category after initial recognition. 
     
 
 

32
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Jika,  karena  perubahan  intensi  atau  kemampuan    If,  as  a  result  of  a  change  in  Group’s  intention 
Grup,  instrumen  tersebut  tidak  tepat  lagi  or  ability,  it  is  no  longer  appropriate  to  classify 
diklasifikasikan  sebagai  investasi  dimiliki  hingga  an  investment  as  held  to  maturity,  it  shall  be 
jatuh  tempo,  maka  investasi  tersebut  direklasifikasi  reclassified  as  available  for  sale  and 
menjadi  tersedia  untuk  dijual  dan  diukur  kembali  remeasured  at  fair  value.  Whenever  sales  or 
pada  nilai  wajar.  Jika  terjadi  penjualan  atau  reclassification  of  more  than  an  insignificant 
reklasifikasi  atas  investasi  dimiliki  hingga  jatuh  amount  of  held-to-maturity  investments,  any 
tempo  dalam  jumlah  yang  lebih  dari  jumlah  yang  remaining held-to-maturity investments shall be 
tidak  signifikan,  maka  sisa  investasi  dimiliki  hingga  reclassified  as  available  for  sale,  other  than 
jatuh  tempo  direklasifikasi  menjadi  tersedia  untuk  sales  or  reclassification  that  are  so  close  to 
dijual,  kecuali  penjualan  atau  reklasifikasi  tersebut  maturity or the financial asset’s call date, occur 
dilakukan  ketika  aset  keuangan  sudah  mendekati  after  all  the  financial  asset’s  original  principal 
jatuh tempo atau tanggal pembelian kembali, terjadi  has  been  collected  substantially  through 
setelah seluruh jumlah pokok telah diperoleh secara  scheduled  payments  or  prepayments,  or  are 
substansial  sesuai  jadwal  pembayaran  atau  telah  attributable  to  an  isolated  event  that  is  beyond 
diperoleh pelunasan dipercepat; atau terkait dengan  control, non-recurring, and could not have been 
kejadian  tertentu  yang  berada  di  luar  kendali,  tidak  reasonably anticipated. 
berulang, dan tidak dapat diantisipasi secara wajar. 
     
Saling Hapus Aset Keuangan dan Liabilitas Netting a Financial Asset and a Financial
Keuangan Liability

Aset  keuangan  dan  liabilitas  keuangan    A  financial  asset  and  financial  liability  shall  be 
disalinghapuskan, jika dan hanya jika, Grup saat ini  offset when and only when, the Group currently 
memiliki hak yang dapat dipaksakan secara hukum  has  a  legally  enforceable  right  to  net  off  
untuk  melakukan  saling  hapus  atas  jumlah  yang  the  recognized  amount;  and  intends  either  to 
telah  diakui  tersebut;  dan  berintensi  untuk  settle on a net basis, or to realise the asset and 
menyelesaikan  secara  neto  atau  untuk  settle the liability simultaneously. 
merealisasikan  aset  dan  menyelesaikan 
liabilitasnya secara simultan. 
 
Pengukuran Nilai Wajar Fair Value Measurement

Nilai  wajar  adalah  harga  yang  akan  diterima  untuk    Fair value is the price that would be received to 


menjual  suatu  aset  atau  harga  yang  akan  dibayar  sell an asset or paid to transfer a liability in an 
untuk  mengalihkan  suatu  liabilitas  dalam  transaksi  orderly transaction between market participants 
teratur  antara  pelaku  pasar  pada  tanggal  at the measurement date. 
pengukuran. 
     
Nilai  wajar  aset  dan  liabillitas  keuangan  diestimasi    The  fair  value  of  financial  assets  and  financial 
untuk  keperluan  pengakuan  dan  pengukuran  atau  liabilities must be estimated for recognition and 
untuk keperluan pengungkapan.  measurement or for disclosure purposes. 
     
Nilai wajar dikategorikan  dalam level yang berbeda    Fair values are categorised into different levels 
dalam  suatu  hirarki  nilai  wajar  berdasarkan  pada  in a fair value hierarchy based on the degree to 
apakah  input  suatu  pengukuran  dapat  diobservasi  which  the  inputs  to  the  measurement  are 
dan  signifikansi  input  terhadap  keseluruhan  observable and the significance of the inputs to 
pengukuran nilai wajar:  the fair value measurement in its entirety:  
     
(i)  Harga  kuotasian  (tanpa  penyesuaian)  di  pasar    (i)  Quoted  prices  (unadjusted)  in  active 
aktif  untuk  aset  atau liabilitas yang  identik  yang  markets for identical assets or liabilities that 
dapat  diakses  pada  tanggal  pengukuran  can be accessed at the measurement date 
(Level 1).  (Level 1). 
     
(ii)  Input  selain  harga  kuotasian  yang  termasuk    (ii)  Inputs other than quoted prices included in 
dalam  Level  1  yang  dapat  diobservasi  untuk  Level  1  that  are  observable  for  the  assets 
aset  atau  liabilitas,  baik  secara  langsung  or  liabilities,  either  directly  or  indirectly 
maupun tidak langsung (Level 2).  (Level 2). 
     
(iii) Input  yang  tidak  dapat  diobservasi  untuk  aset    (iii) Unobservable  inputs  for  the  assets  or 
atau liabilitas (Level 3).  liabilities (Level 3). 

Dalam  mengukur  nilai  wajar  aset  atau  liabilitas,    When measuring the fair value of an asset or a 


Grup  sebisa  mungkin  menggunakan  data  pasar  liability,  the  Group  uses  market  observable 

33
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
yang  dapat  diobservasi.  Apabila  nilai  wajar  aset  data as much as possible. If the fair value of an 
atau  liabilitas  tidak  dapat  diobservasi  secara  asset  or  a  liability  is  not  directly  observable,  
langsung, Grup menggunakan teknik penilaian yang  the  Group  uses  evaluation  techniques  that 
sesuai  dengan  keadaannya  dan  memaksimalkan  appropriate  in  the  circumstances  and 
penggunaan  input  yang  dapat  diobservasi  yang  maximizes  the  use  of  relevant  observable 
relevan dan meminimalkan penggunaan input  yang  inputs  and  minimizes  the  use  of  unobservable 
tidak dapat diobservasi.  inputs. 
     
Perpindahan  antara  level  hirarki  nilai  wajar  diakui    Transfers  between  levels  of  the  fair  value 
oleh  Grup  pada  akhir  periode  pelaporan  dimana  hierarchy  are  recognised  by  the  Group  at  
perpindahan terjadi.   the  end  of  the  reporting  period  during  which  
  the change occurred. 
     
h. Kas dan Setara Kas h. Cash and Cash Equivalent
     
Kas  dan  setara  kas  termasuk  kas,  kas  di  bank    Cash and cash equivalents  are  cash  on hand, 
(rekening  giro),  dan  deposito  berjangka  yang  jatuh  cash  in  banks  (demand  deposits)  and  time 
tempo  dalam  jangka  waktu  tiga  bulan  atau  kurang  deposits  with  maturity  periods  of  three  months 
pada  saat  penempatan  yang  tidak  digunakan  or  less  at  the  time  of  placement  that  are  not 
sebagai  jaminan  atau  tidak  dibatasi  used as collateral or are not restricted. 
penggunaannya. 
     
i. Investasi Jangka Pendek i. Short-Term Investment

Deposito  berjangka  yang  jatuh  temponya  kurang    Time  deposits  with  maturity  less  than  three 
dari  tiga  bulan  pada  saat  penempatan  namun  months on the date of placement and pledged 
dijaminkan,  atau  telah  ditentukan  penggunaannya  as  collateral,  or  restricted  and  time  deposits 
dan  deposito  berjangka  yang  jatuh  temponya  lebih  with  maturity  of  more  than  three  months  on   
dari  tiga  bulan  setelah  tanggal  penempatan  the  date  of  placement  is  presented  as  short-
disajikan sebagai investasi jangka pendek. Deposito  term  investment.  The  time  deposits  are 
berjangka disajikan berdasarkan nilai nominal.  presented using par value. 
     
j. Piutang Retensi   j. Retention Receivables 
 
Piutang  retensi  merupakan  piutang  Grup  kepada    Retention  receivable  represents  the  Group’s 
pemberi  kerja  yang  akan  dilunasi  setelah  receivable  to  the  owner  of  the  project  which 
penyelesaian kontrak atau pemenuhan kondisi yang  will be paid after completion of the contract or 
ditentukan  kontrak.  Piutang  retensi  dicatat  pada  fulfillment of certain conditions in the contract. 
saat pemotongan sejumlah persentase tertentu dari  Retention  receivable is recorded when certain 
setiap  tagihan  termin  untuk  ditahan  oleh  pemberi  percentage  deductions  are  applied  in  every 
kerja  sampai  suatu  kondisi  setelah  penyelesaian  account receivable’s claim which is retained by  
kontrak dipenuhi.  the owner of the project up to certain condition 
  after completion of the contract has been met. 
 
k. Tagihan Bruto kepada Pengguna Jasa k. Gross Amount Due from Customers 

Tagihan  bruto  kepada  pemberi  kerja  merupakan    Gross amount due from customers represents 


piutang  Grup  yang  berasal  dari  pekerjaan  kontrak  the  Group’s  receivable  originated  from 
konstruksi  yang  dilakukan  namun  pekerjaan  yang  construction  contract  in  progress.  Gross 
dilakukan masih dalam pelaksanaan. Tagihan bruto  amount  due  from  customers  is  presented  as 
disajikan  sebesar  selisih  antara  biaya  yang  terjadi  the  net  amount  of  costs  incurred  plus 
ditambah  laba  yang  diakui  dikurangi  dengan  recognized  profits,  minus  the  sum  of 
kerugian yang diakui dan termin.  recognized losses and progress billings. 
     
Tagihan  bruto  diakui  sebagai  pendapatan  sesuai    Gross  amount  due  from  customers  is 
dengan  metode  persentase  penyelesaian  yang  recognized  as  revenue  based  on                   
dinyatakan  dalam  berita  acara  penyelesaian  the percentage of completion method which is 
pekerjaan,  dimana  faktur  belum  dapat  ditagihkan  stated  on  the  certificate  of  work  completion, 
karena  perbedaan  antara  tanggal  berita  acara  while  the  invoice  is  still  unbilled  due  to           
kemajuan  (progress)  fisik  dengan  pengajuan  the  difference  between  the  date  of  physical 
penagihan  pada  tanggal  laporan  posisi  keuangan  progress  certificates  and  the  submission  of 
konsolidasian.  billing  on  the  consolidated  statement  of 
financial position date. 
     

34
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
l. Biaya Dibayar Dimuka   l. Prepaid Expenses
 
Biaya  dibayar  dimuka  merupakan  biaya  yang  telah    Prepaid  expenses  are  costs  that  have  been 
dibayar  namun  pembebanannya  baru  akan  paid  but  will  be  incurred  future  periods,  such 
dilakukan  pada  periode  yang  akan  datang,  seperti  as  prepaid  insurance  premiums,  prepaid 
premi  asuransi  dibayar  dimuka,  bunga  dibayar  interest  and  rent  paid  in  advance.  Prepaid 
dimuka,  dan  sewa  dibayar  dimuka.  Biaya  dibayar  expenses  are  amortized  over  the  periods 
dimuka  diamortisasi  sesuai  dengan  masa  benefit using the straight-line method. 
manfaatnya  dengan  menggunakan  metode  garis   
lurus. 
     
m. Persediaan    m. Inventories 
 
Persediaan  dinyatakan  berdasarkan  jumlah    Inventories are carried at the lower of cost and 
terendah  antara  biaya  perolehan  dan  nilai  realisasi  net  realizable  value.  The  cost  of  inventories 
neto. Biaya perolehan terdiri dari seluruh biaya lain  comprises  all  costs  incurred  in  bringing        
yang  timbul  sampai  persediaan  berada  dalam  the  inventories  to  their  present  location  and 
kondisi  dan  lokasi  saat  ini.  Biaya  perolehan  condition.  Cost  is  determined  using  first-in 
ditentukan  dengan  metode  masuk  pertama  keluar  first-out method (FIFO). Net realizable value is 
pertama  (FIFO).  Nilai  realisasi  neto  merupakan  the  estimated  selling  price  in  the  ordinary 
taksiran  harga  jual  dalam  kegiatan  usaha  biasa  course of  business  minus the  estimated  costs 
dikurangi estimasi biaya penyelesaian dan estimasi  of  completion  and  the  estimated  costs 
biaya yang diperlukan untuk membuat penjualan.  necessary to make the sale. 
     
Persediaan  tanah  kavling  untuk  usaha  sarana    Inventory  of  plots  of  land  for  housing  facilities 
perumahan dinilai dengan menggunakan harga beli  business  are  assessed  using  the  acquisition 
ditambah  dengan  biaya  lain-lain  yang  dikeluarkan  cost plus other expenditures incurred to make     
sampai  dengan  tanah  tersebut  siap  dijual  the land ready for sale (with certificate). 
(bersertifikat). 
     
Persediaan  material  dinyatakan  sebesar  nilai  yang    Material  inventories  are  stated  at  the  lower  of 
lebih  rendah  antara  harga  perolehan  dengan  nilai  the  cost  or  net  realizable  value  and  even 
realisasi  bersih  dan  persediaan  precast  pun  precast  inventories  are  using  the  same 
menggunakan metode yang sama.  method. 
     
Penyisihan  penurunan  nilai  persediaan  dibentuk    Allowance  for  the  decrease in  inventory  value 
berdasarkan  penelaahan  fisik  persediaan  pada  is  formed  based  on  the  physical  check  of 
akhir periode.  inventory at the end of the period. 
     
n. Aset Tetap   n. Fixed Assets
 
Aset  tetap  dipertanggungjawabkan  dengan  Fixed  assets  are  accounted  for  using  cost 
menggunakan  model  biaya  dan  dinyatakan  model and is stated based on acquisition cost 
berdasarkan  biaya  perolehan  setelah  dikurangi  minus  the  accumulated  depreciation  and 
akumulasi  penyusutan.  Aset  tetap,  kecuali  tanah,  accumulated  impairment  losses,  if  any.  Fixed 
disusutkan  dengan  metode  saldo  menurun  ganda  assets,  except  for  land,  are  depreciated using 
dan garis lurus (untuk gedung dan bangunan).  the  double-declining  and  straight-line  method 
(for plants and buildings). 
   
Aset  tetap  tanah  dan  bangunan  dinyatakan  Land and buildings are stated at their revalued 
berdasarkan  nilai  revaluasi  yang  merupakan  nilai  amounts,  being  the  fair  value  at  the  date  of 
wajar  pada  tanggal  revaluasi  dikurangi  akumulasi  revaluation, less any subsequent accumulated 
penyusutan  dan  akumulasi  rugi  penurunan  nilai  depreciation  and  subsequent  accumulated 
yang  terjadi  setelah  tanggal  revaluasi.  Revaluasi  impairment  losses.  Revaluation  is  made  with 
dilakukan dengan keteraturan yang memadai untuk  sufficient regularity to ensure that the carrying 
memastikan  bahwa  jumlah  tercatat  tidak  berbeda  amount  does  not  differ  materially  from  the 
secara material dari jumlah yang ditentukan dengan  amount  determined  using  fair  value  at  the 
menggunakan nilai wajar pada tanggal laporan.  reporting date. 
   
Kenaikan  yang  berasal  dari  revaluasi  tanah  dan  Any  revaluation  increase  arising  on                
bangunan  diakui  pada  penghasilan  komprehensif  the  revaluation  of  such  land  and  buildings  is 
lain  dan  terakumulasi  dalam  ekuitas  pada  bagian  recognized  in  other  comprehensive  income 
surplus  revaluasi,  kecuali  sebelumnya  penurunan  and  accumulated  in  equity  under  revaluation 
revaluasi atas aset yang sama pernah diakui dalam  surplus, except to the extent that it reverses a 

35
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
laba  rugi,  dalam  hal  ini  kenaikan  revaluasi  hingga  revaluation  decrease,  for  the  same  asset 
sebesar  penurunan  nilai  aset  akibat  revaluasi  which  was  previously  recognized  in  profit  or 
tersebut,  dikreditkan  dalam  laba  rugi.  Penurunan  loss,  in  this  case  the  increase  is  credited  to 
jumlah  tercatat  yang  berasal  dari  revaluasi  tanah  profit  or  loss  to  the  extent  of  the  decrease 
dan  bangunan  dibebankan  dalam  laba  rugi  apabila  previously  charged.  A  decrease  in  carrying 
penurunan tersebut melebihi saldo surplus revaluasi  amount arising on the revaluation of such land 
aset yang bersangkutan, jika ada.  and  buildings  is  charged  to  profit  or  loss  to    
the extent that it exceeds the balance, if there 
is any. 
     
Surplus  revaluasi  tanah  dan  bangunan  yang  telah    The revaluation surplus land and buildings that 
disajikan  dalam  ekuitas  dipindahkan  langsung  ke  has  been  presented  in  equity  is  transferred 
saldo  laba  pada  saat  aset  tersebut  dihentikan  directly to retained earnings when the asset is 
pengakuannya.  derecognized. 
     
Jika aset revaluasi tidak mengalami perubahan nilai    If there is no significant changes in fair value of 
wajar  secara  signifikan,  aset  tersebut  direvaluasi  assets  revaluation,  those  assets  will  be 
paling kurang setiap 3 (tiga) tahun.  revaluated every 3 (three) years. 
     
Aset  tetap  tanah  tidak  disusutkan.  Sedangkan  aset    Fixed  asset  lands  are  not  depreciated.  While 
tetap gedung disusutkan dengan metode garis lurus  building  assets  are  depreciated  using  
selama  masa  manfaat  aset  tersebut,  sebagai  the  straight-line  method  based  on  their 
berikut:  estimated useful lives, as follows: 
     
      Masa Manfaat/       
      Useful Life       
              
Gedung dan Pabrik     20 Tahun/ Years     Buildings and Plants 
     
Aset tetap kecuali tanah dan bangunan dinyatakan    Fixed  assets  except  for  land and buildings  are 
berdasarkan  biaya  perolehan  dikurangi  akumulasi  accounted  for  using  cost  less  accumulated 
penyusutan,  dan  akumulasi  penurunan  nilai  jika  depreciation  and  accumulated  impairment 
ada, dan disusutkan dengan menggunakan metode  losses,  if  there  is  any,  and  depreciated  using              
saldo  menurun  berganda  selama  taksiran  masa  the  double  -  declining  method  based  on         
manfaat ekonomis aset tetap sebagai berikut:  the estimated usefull life of the fixed assets as 
follows: 
         
     Masa Manfaat/       
      Useful Life       
              
Kendaraan     8 Tahun/ Years     Vehicles 
Perlengkapan Kantor      2 - 8 Tahun/ Years     Office Supplies 
Peralatan Proyek     4 - 16 Tahun/ Years     Project Equipment 
     
Grup  melakukan  perubahan  kebijakan  akuntansi    The  Group  changed  its  accounting  policy  on 
aset  tetap  untuk  kelompok  tanah  dan  bangunan  fixed assets classified as land and buildings in 
pada  tahun  2015,  semula  dicatat  berdasarkan  2015,  which  previously  accounted  for  using   
metode  harga  perolehan,  menjadi  metode  the cost method, to revaluatian model, which is 
revaluasi,  yang  dihitung  oleh  penilai  independen  then  appraised  by  an  independent  appraiser 
(KJPP).  Perubahan  kebijakan  akuntansi  ini  (KJPP).  The  changes  in  the  accounting 
dilakukan  dengan  tujuan  agar  laporan  keuangan  policies was made for the purpose to represent 
konsolidasian  dapat  menggambarkan  investasi  the  Group’s  investment  on  land  and  buildings 
Grup  dalam  aset  tetap  kelompok  tanah  dan  in  the  consolidated  financial  statements  in 
bangunan  dan  perubahan  dalam  investasi  tersebut  accordance  with  their  market  value  at            
sesuai  dengan  nilai  pasar  pada  periode  laporan  the  consolidated  financial  reporting  date      
keuangan konsolidasian (Catatan 16).  (Note 16). 
     
Biaya  perbaikan  dan  pemeliharaan  dibebankan    The  cost  of  repairs  and  maintenance  is 
pada  laba  rugi  pada  saat  terjadinya  biaya  -  biaya  charged to profit or loss as incurred, while the 
tersebut,  sedangkan  pengeluaran  dalam  jumlah  significant  expenditures  for  renewals  and 
besar  dan  sifatnya  meningkatkan  kondisi  aset  improvements are capitalized. All expenditures 
secara signifikan dikapitalisasi. Semua pengeluaran  subsequent  to  the  purchasing  of  fixed  assets 
setelah  perolehan  awal  aset  tetap  akan  ditambah  would  be  added  (capitalized)  on  the  carrying 
(kapitalisasi)  pada  jumlah  tercatat  aset  yang  amount of the assets. 
bersangkutan.   

36
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Jumlah  tercatat  aset  tetap  dihentikan    The  carrying  amount  of  fixed  assets  is 
pengakuannya  pada  saat  dilepaskan  atau  saat  derecognized upon disposal or when no future 
tidak  ada  manfaat  ekonomis  masa  depan  yang  economic benefits are expected from its use or 
diharapkan  dari  penggunaan  atau  pelepasannya.  disposal.  Any  profit  or  loss  arising  on 
Laba  atau  rugi  yang  timbul  dari  penghentian  derecognition  of  the  asset  (calculated  as       
pengakuan  aset  (dihitung  sebagai  perbedaan  the  difference  between  the  net  disposal 
antara  jumlah  neto  hasil  pelepasan  dan  jumlah  proceeds  and  the  carrying  amount  of             
tercatat dari aset) dimasukkan dalam laba rugi pada  the  asset)  is  included  in  the  profit  or  loss  for  
periode/  tahun  aset  tersebut  dihentikan  the  period/  year  when  the  assets  are 
pengakuannya.  derecognized. 
     
Apabila  suatu  aset  tetap  tidak  dipergunakan  lagi    When  assets  are  not  used  or  otherwise 
atau  dilepas,  nilai  tercatat  dan  akumulasi  disposed  of,  the  carrying  costs  and  related 
penyusutannya  dikeluarkan  dari  pencatatannya  accumulated  depreciation  are  removed  from 
sebagai  aset  tetap  dan  keuntungan  atau  kerugian  the fixed assets account and any resulting gain 
yang  timbul  dilaporkan  dalam  laba  rugi  tahun  or loss is recorded or charged to profit or loss 
berjalan.  for the year. 
     
Pada  akhir  periode/  tahun  buku  pelaporan,  Grup    At  the  end  of  reporting  period/  year  end,  
melakukan penelaahan berkala atas masa manfaat  the  Group periodically  reviews  the useful  lives 
ekonomis  aset,  nilai  residu,  metode  penyusutan,  of  the  assets,  asset’s  residual  value, 
dan  sisa  umur  pemakaian  berdasarkan  spesifikasi  depreciation  method  and  the remaining  usage 
teknis.  expectation based on technical specification. 
     
Aset dalam penyelesaian dinyatakan sebesar biaya    Construction  in  progress  is  stated  at  cost  and 
perolehan,  dan  akan  dipindahkan  ke  aset  tetap  will  be  reclassified  to  the  respective  fixed 
pada  saat  sudah  selesai  pembangunannya  dan  assets when completed and ready to use. 
siap digunakan. 
     
o. Properti Investasi     o. Investment Properties 
 
Properti  investasi  adalah  properti  (tanah  atau    Investment properties are properties (land or a 
bangunan  atau  bagian  dari  suatu  bangunan  atau  building  or  part  of  a  building  or  both)  held  by 
kedua-duanya)  yang  dikuasai  oleh  pemilik  atau  the owner or the lessee under a finance lease 
penyewa  melalui  sewa  pembiayaan  untuk  to  earn  rentals  or  for  capital  appreciation  or 
menghasilkan  sewa  atau  untuk  kenaikan  nilai  atau  both,  rather  than  for  use  in  the  production  or 
kedua-duanya,  dan  tidak  untuk  digunakan  dalam  supply  of  goods  or  services  or  for 
produksi  atau  penyediaan  barang  atau  jasa  atau  administrative  purposes;  or  sale  in  daily 
untuk  tujuan  administratif;  atau  dijual  dalam  business activities.
kegiatan usaha sehari-hari. 
     
Properti  investasi  diakui  sebagai  aset  jika  dan    Investment property is recognized as an asset 
hanya  jika  besar  kemungkinan  manfaat  ekonomi  when,  and  only  when  it  is  probable  that         
masa  depan  yang  terkait  dengan  properti investasi  the  future  economic  benefits  that  are 
akan  mengalir  ke  entitas;  dan  biaya  perolehan  associated  with  the  investment  property  will 
properti investasi dapat diukur dengan andal.  flow  to  the  entity;  and  the  cost  of                     
the  investment  property  can  be  measured 
reliably. 
     
Properti  investasi  pada  awalnya  diukur  sebesar    An  investment  property  shall  be  measured 
biaya  perolehan,  meliputi  harga  harga  pembelian  initially at its cost, comprises its purchase price 
dan  setiap  pengeluaran  yang  dapat  diatribusikan  and  any  directly  attributable  expenditure 
secara  langsung  (biaya  jasa  hukum,  pajak  (professional  fees  for  legal  services,  property 
pengalihan properti dan biaya transaksi lain). Biaya  transfer  taxes  and  other  transaction  costs). 
transaksi  termasuk  dalam  pengukuran  awal  Transaction  costs  are  included  in  the  initial 
tersebut. measurement. 
     
Setelah  pengakuan  awal,  Grup  memilih    After  initial  recognition,  the  Group  chooses  to 
menggunakan  model  nilai  wajar  dan  mengukur  use  fair  value  model  and  measure  all  of  its 
seluruh  properti  investasi  berdasarkan  nilai  wajar.  investment property at fair value. A gain or loss 
Keuntungan  atau  kerugian  yang  timbul  dari  arising  from  a  change  in  the  fair  value  of 
perubahan  nilai  wajar  properti  investasi  diakui  investment  property  is  recognized  in  profit  or 
dalam laba rugi pada periode terjadinya. loss for the period in which it arises.
     

37
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Penentuan  nilai  wajar  investasi  didasarkan  pada    The  fair  value  of  investment  property  is  based 
penilaian oleh penilai independen yang mempunyai  on  a  valuation  by  an  independent  appraiser 
kualifikasi profesional yang telah diakui dan relevan  who  holds  a  recognised  and  relevant 
serta  memiliki  pengalaman  terkini  di  lokasi  dan  professional  qualification  and  has  recent 
kategori properti investasi yang dinilai.  experience  in  the  location  and  category  of  
the investment property being valued. 
     
Pengalihan ke properti investasi dilakukan jika, dan    The  transfer  to  investment  property  is  made 
hanya  jika,  terdapat  perubahan  penggunaan  yang  when, and only when, there is a change in use, 
ditunjukkan  dengan  berakhirnya  pemakaian  oleh  evidenced by the end of owner-occupation and 
pemilik dan dimulainya sewa operasi kepada pihak  commencement  of  an  operating  lease  to 
lain.   another party.  
     
Pengalihan  dari  properti  investasi  dilakukan  jika,    The transfer from investment property is made 
dan  hanya  jika,  terdapat  perubahan  penggunaan  when, and only when, there is a change in use, 
yang  ditunjukkan  dengan  dimulainya  penggunaan  evidenced  by  the  commencement  of  owner-
oleh  pemilik  dan  dimulainya  pengembangan  untuk  occupation  and  commencement  of 
dijual.  development with a view to sell. 
     
Properti  investasi  dihentikan  pengakuannya  pada    An  investment  property  is  derecognized  on 
saat  dilepaskan  atau  ketika  tidak  digunakan  lagi  disposal  or  when  the  investment  property  is 
secara  permanen  dan  tidak  memiliki  manfaat  permanently withdrawn from use and no future 
ekonomi  masa  depan  yang  diperkirakan  dari  economic  benefits  are  expected  from  its 
pelepasannya.  Keuntungan  atau  kerugian  yang  disposal.  Gains  or  losses  arising  from          
timbul  dari  penghentian  atau  pelepasan  ditentukan  the  retirement  or  disposal  are  determined  as 
dari selisih antara hasil  neto pelepasan dan jumlah  the  difference  between  the  net  disposal 
tercatat  aset,  dan  diakui  dalam  laba  rugi  pada  proceeds and the carrying amount of the asset, 
periode terjadinya penghentian atau pelepasan.  and  are  recognized  in  profit  or  loss  in             
the period of the retirement or disposal. 
     
p. Aset Lain-lain    p. Other Assets
 
Akun-akun  yang  tidak  dapat  digolongkan  dalam    Accounts that cannot  be classified into current 
aset  lancar,  investasi,  maupun  aset  tidak  berwujud  assets,  investment,  or  intangible  assets  are 
disajikan dalam aset lain-lain.  presented as other assets. 
     
Beban  tangguhan  berupa  hak  atas  tanah  dicatat    Deferred  expense  such  as  land  right  is 
sebesar  biaya  perolehan  hak  atau  biaya  recorded  at  cost  of  acquisition  or  cost  of 
pembaharuan hak. Semua beban tangguhan terkait  renewal  right.  All  deferred  expense  of  right  is 
hak  diamortisasi  sepanjang  umur  hukum  hak  atau  amortized  over  useful  life  or  economic  life  of 
umur  ekonomis  aset  tanah,  yang  mana  yang  lebih  land, whichever is shorter. 
pendek.   
     
q. Perjanjian Konsesi Jasa   q. Service Concession Arrangement
 
Grup  telah  menerapkan  ISAK  16,  “Perjanjian    The  Group  has  adopted  ISAK  16,  “Service 
Konsesi  Jasa”  (ISAK  16)  dan  ISAK  22,  “Perjanjian  Concession  Arrangement”  (ISAK  16)  and  
Konsesi Jasa Pengungkapan” (ISAK 22).  ISAK  22,  “Service  Concession  Arrangement: 
Disclosure” (ISAK 22). 
     
ISAK 16 mengatur prinsip umum dalam pengakuan    ISAK  16  determines  the  general  principles  in 
dan  pengukuran  hak  dan kewajiban  terkait dengan  the recognition and measurement of rights and 
perjanjian  konsesi  jasa.  ISAK  16  mengatur  bahwa  liabilities  related  to  service  concession 
infrastruktur tidak diakui sebagai aset tetap operator  arrangement.  ISAK  16  regulates  that  an 
(pihak  penerima  konsesi  jasa)  karena  perjanjian  operator  (concession  right  beneficiary)  does 
jasa  kontraktual  tidak  memberikan  hak  kepada  not  recognize  any  infrastructure  assets 
operator  untuk  mengendalikan  penggunaan  because  the  contractual  service  arrangement 
infrastruktur  jasa  publik.  Operator  memiliki  akses  does not convey the right to control the use of 
untuk  mengoperasikan  infrastruktur  dalam  the public service infrastructure to the operator. 
menyediakan  jasa  publik  untuk  kepentingan  The  operator  has  access  to  operate                
pemberi  konsesi  sesuai  dengan  persyaratan  yang  the  infrastructure  to  provide  public  service  on 
ditentukan dalam kontrak.  behalf  of  the  grantor  in  accordance  with  
the terms specified in the contract. 
     

38
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
ISAK  22  memberikan  panduan  spesifik  mengenai    ISAK  22  provides  specific  guidance  for  
pengungkapan  yang  diperlukan  atas  perjanjian  the  required  disclosures  regarding  the  service 
konsesi jasa.  concession arrangement. 
     
Grup membukukan perjanjian konsesi jasa sebagai    The Group accounts for its service concession 
model  aset  tak  berwujud  karena  memiliki  hak  arrangement  under  the  intangible  asset  model 
(lisensi)  untuk  membebankan  pengguna  jasa  as it receives the right (license) to charge users 
publik.  Pada  saat  pengakuan  awal,  aset  konsesi  of  public  service.  At  initial  recognition, 
dicatat  pada  nilai  wajar  dari  imbalan  yang  diterima  concession  assets  are  recorded  at  the  fair 
atau  akan  diterima.  Aset  konsesi  ini  adalah  aset  value of the benefit received or to be received. 
hak  pengelolaan  jalan  tol  yang  akan  diamortisasi  These  concession  assets  are  toll  road 
selama  sisa  masa  hak  konsesi  sejak  tanggal  concession rights which will be amortized over 
pengoperasian  ruas  jalan  tol.  Selama  masa  the  remaining  concession  period  from  
konstruksi,  akumulasi  biaya  perolehan  dan  the  date  of  operation  of  the  toll  road.  
konstruksi  jalan  tol  diakui  sebagai  aset  konsesi  During  the  construction  period,  
dalam  penyelesaian.  Amortisasi  mulai  dibebankan  the  accumulated  toll  road  construction  cost  is 
pada saat aset konsesi tersebut siap digunakan.  recognized  as  concession  assets  in  progress. 
The  amortization  of  the  cost  starts  when  
the  concession  assets  are  ready  to  be 
operated.                      
     
Aset  konsesi  akan  dihentikan  pengakuannya  pada    The  concession  assets  are  derecognized  at     
saat  berakhirnya  masa  konsesi.  Tidak  akan  ada  the end of the concession period. There will be 
keuntungan  atau  kerugian  saat  penghentian  no  gain  or  loss  upon  derecognition  as  
pengakuan  karena  aset  konsesi  diharapkan  telah  the  concession  assets  which  are  expected  to 
diamortisasi  secara  penuh,  akan  diserahkan  be fully amortized by then, will be handed over 
kepada  Badan  Pengatur  Jalan  Tol  (BPJT)  tanpa  to  the  Badan  Pengatur  Jalan  Tol  (BPJT)  with 
syarat.  no considerations. 
     
Aset  konsesi  yang  diberikan  kepada  Grup  dapat    Concession  assets  granted  to  the  Group            
dipindahkan  dengan  persetujuan  Pemerintah/  are  transferrable  with  approval  from  
BPJT.  Aset  konsesi  ini  akan  diserahkan  ke  the  Government/  BPJT.  These  concession 
Pemerintah/  BPJT  pada  saat  akhir  masa  konsesi  right  assets  will  be  transferred  to                     
dan, pada saat itu, seluruh akun yang berhubungan  the  Government/  BPJT  at  the  end  of  
dengan  aset  konsesi  akan  dihentikan  the  concession  period  and,  at  that  time,  all 
pengakuannya.  accounts  related  to  the  concession  rights 
assets will be derecognized. 
     
Selama  periode  hak  pengusahaan  jalan  tol,  aset    During  the  toll  road  concession  rights  period, 
hak  pengusahaan  jalan  tol  dapat  dikeluarkan  dari  the  concession  rights  assets  may  be 
laporan  posisi  keuangan  konsolidasian  Grup  jika  derecognized  from  the  consolidated  statement 
jalan tol diserahkan (dikuasakan) kepada pihak lain  of financial position of the Group if the toll road 
atau  Pemerintah/  BPJT  mengubah  status  jalan  tol  is  transferred  to  another  party  or  
menjadi  jalan  non-tol  atau  tidak  ada  manfaat  the  Government/BPJT  changes  the  status  of 
ekonomi  yang  dapat  diharapkan  dari  the  toll  road  to  non-toll  road  or  if  there  is  no 
penggunaannya.  Keuntungan  atau  kerugian  yang  economic  benefit  expected  from  usage  of       
timbul  dari  penghentian  atau  pelepasan  aset  the  toll  road.  Gain  or  loss  from  
konsesi  diakui  sebagai  keuntungan  atau  kerugian  the  discontinuance  or  disposal  of  concession 
dalam  laporan  laba  rugi  dan  penghasilan  assets  is  recognized  in  the  statement  of  profit 
komprehensif lain konsolidasian.  or  loss  and  other  consolidated  comprehensive 
income. 
     
Selain  itu,  Grup  mengakui  dan  mengukur    In  addition,  the  Group  recognizes  and 
pendapatan  konstruksi  sesuai  dengan  PSAK  34  measures construction revenues in accordance 
(Revisi  2010),  “Kontrak  Konstruksi”  (PSAK  34)  dan  with  PSAK  34  (Revised  2010),  “Construction 
PSAK  23,  “Pendapatan”,  untuk  jasa  yang  Contracts”  (PSAK  34)  and  PSAK  23, 
dilakukannya.  Ketika  Grup  menyediakan  jasa  “Revenue”,  for  the  services  it  performs.  When 
konstruksi  atau  peningkatan  kemampuan,  imbalan  the  Group  provides  construction  services  or 
yang  diterima  atau  akan  diterima  oleh  Grup  diakui  upgrades  services,  the  consideration  received 
pada nilai wajar.  or to be received by the Group is recognized at 
its fair value. 
     
 

39
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Kontrak konstruksi meliputi seluruh biaya konstruksi    Construction  contract  comprises  all  
pembangunan jalan tol atau peningkatan kapasitas  the  amounts  of  toll  road  construction  costs  or 
jalan  tol  yang  meliputi  pengadaan  tanah,  studi  toll  road  capacity  improvement  consisting  of 
kelayakan  dan  biaya-biaya  lain  yang  berhubungan  land acquisition cost, feasibility study cost and 
langsung dengan pembangunan jalan tol, termasuk  other  costs  that  are  directly  attributable  to     
biaya  pembangunan  jalan  akses  ke  jalan  tol,  jalan  the  toll  road  construction,  including 
alternatif dan fasilitas jalan umum yang disyaratkan,  construction costs for access roads, alternative 
ditambah biaya pinjaman lain yang secara langsung  roads  and  required  public  road  facilities, 
maupun tidak langsung digunakan untuk mendanai  interest  and  other  borrowing  costs,  either 
proses  pembangunan  aset  tersebut.  Biaya  directly  or  indirectly  used  for  financing           
pinjaman dikapitalisasi  sampai  dengan saat  proses  the  development  of  assets.  These  costs  are 
pembangunan  tersebut  telah  selesai  dan  aset  capitalized  until  the  construction  is  completed 
konsesi telah siap untuk dioperasikan.  and  the  concession  assets  are  ready  to  be 
operated. 
     
Grup  mengakui  biaya  jasa  konstruksi  dan    The  Group  recognizes  construction  services 
peningkatan kemampuan aset konsesi sebagai aset  and increased capacity of concession asset as 
tak  berwujud  dimana  Grup  menerima  hak  (lisensi)  intangible  assets  in  which  the  Group  receives                
untuk  membebankan  pengguna  jasa  publik.  Suatu  the  rights  (license)  to  charge  users  of  public 
hak  untuk  membebankan  pengguna  jasa  publik  services.  A  right  to  charge  users  of  public 
bukan  merupakan  hak  tanpa  syarat  untuk  services is not an unconditional right to receive 
menerima  kas  karena  jumlahnya  bergantung  pada  cash  because  the  amounts  depend  on          
sejauh  mana  publik  menggunakan  jasa.  Selama  the  extent  of  the  public  using  the  service. 
periode  konstruksi,  Grup  mencatat  aset  tak  During  the  construction  period,  the  Group 
berwujud  dan  mengakui  pendapatan  dan  biaya  records  intangible  assets,  and  recognizes 
konstruksi  sesuai  dengan  kontraknya.  Biaya  revenues  and  costs  of  construction  in 
konstruksi  merupakan  nilai  dari  jumlah  perolehan  accordance  to  the  contract.  Construction  cost 
kontrak konstruksi.  is  the  value  of  acquisition  of  a  construction 
contract. 
     
Biaya  bunga  dan  biaya  pinjaman  lainnya,  seperti    Interests  and  other  borrowing  costs,  such  as 
diskonto  baik  yang  secara  langsung  ataupun  tidak  discount  fees  on  loans  either  directly  or 
langsung  digunakan  untuk  mendanai  proses  indirectly  used  in  financing  the  construction  of 
pembangunan aset kualifikasian (qualifying assets),  a  qualifying  asset,  are  capitalized  up  to      
dikapitalisasi sampai saat proses pembangunannya  the  date  when  the  construction  is  completed. 
selesai.  Untuk  pinjaman  yang  dapat  dihubungkan  For  borrowings  directly  attributable  to  a 
secara langsung dengan suatu aset tertentu, jumlah  qualifying  asset,  the  amount  allowed  to  be 
yang  dapat  dikapitalisasi  adalah  sebesar  biaya  capitalized  is  determined  as  the  actual 
pinjaman  yang  terjadi  dalam  periode  berjalan,  borrowing  costs  incurred  during  the  period, 
dikurangi  dengan  penghasilan  investasi  sementara  less  any  investment  income  earned  from      
dari pinjaman tersebut.  the temporary investment of such borrowings. 
     
Provisi Pelapisan Jalan Tol    Provision for Toll Road Overlay 
     
Dalam  pengoperasian  jalan  tol,  Grup  mempunyai    In  operating  toll  roads,  the  Group  is  obligated 
kewajiban  untuk  menjaga  kualitas  sesuai  dengan  to maintain quality in accordance with the SPM 
SPM  (Standar  Pelayanan  Minimum)  yang  (Minimum  Service  Standards)  established  by 
ditetapkan  oleh  Kementerian  Pekerjaan  Umum  the Ministry of Public Works of the Republic of 
Republik  Indonesia,  yaitu  antara  lain  dengan  Indonesia,  i.e.,  by  perfoming  toll  road  overlay 
melakukan pelapisan ulang jalan tol secara berkala.  regularly. The cost of this overlay is periodically 
Biaya  pelapisan  ini  akan  dicadangkan  secara  provided  based  on  estimated  utilization  of  toll 
berkala berdasarkan estimasi penggunaan jalan tol  road  by  customers.  The  estimated  net 
oleh  pelanggan.  Provisi  pelapisan  ulang  jalan  tol  provision  for  toll  road  overlay  is  discounted  to 
diukur  dengan  nilai  kini  atas  estimasi  manajemen  its  present  value  that  reflects  management 
terhadap  pengeluaran  yang  diperlukan  untuk  estimates againt cost incurred to settle current 
menyelesaikan liabilitas kini.  provision. 
     
Biaya Pinjaman     Borrowing Costs 
     
Biaya  pinjaman  yang  dapat  diatribusikan  langsung    Borrowing  costs  directly  attributable  to          
dengan  perolehan,  pembangunan  atau  pembuatan  the acquisition, construction or production of an 
aset  yang  membutuhkan  waktu  yang  cukup  lama  asset  that  necessarily  takes  a  substantial 
untuk  persiapan  digunakan  sesuai  tujuannya  atau  period of time to get ready for its intended use 
dijual  dikapitalisasi sebagai  bagian dari  biaya  aset.  or  sale  are  capitalized  as  part  of  the  cost  of  

40
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Semua  biasa  pinjaman  lainnya  diakui  sebagai  the  asset.  All  other  borrowing  costs  are 
beban  pada  periode  terjadi.  Biaya  pinjaman  terdiri  expensed  in  the  period  they  occur.  Borrowing 
dari  biaya  bunga  dan  biaya  lain  yang  ditanggung  costs  consist  of  interest  and  other  costs  that  
oleh Grup sehubungan dengan peminjaman dana.  the  Group  incurs  in  connection  with               
the borrowing of funds. 
     
Kapitalisasi  biaya  pinjaman  dimulai  pada  saat    Capitalization  of  borrowing  costs  commences 
aktivitas  yang  diperlukan  untuk  mempersiapkan  when  the  activities  to  prepare  the  qualifying 
aset  agar  dapat  digunakan  sesuai  dengan  asset  for  its  intended  use  are  in  progress  and 
maksudnya,  dan  pengeluaran  untuk  aset  the  expenditures  for  the  qualifying  asset  and 
kualifikasian  dan  biaya  pinjamannya  telah  terjadi.  the  borrowing  costs  have  been  incurred. 
Kapitalisasi  biaya  pinjaman  dihentikan  pada  saat  Capitalization of borrowing costs ceases when 
selesainya  secara  substansi  seluruh  aktivitas  yang  substantially  all  the  activities  necessary  to 
diperlukan  untuk mempersiapkan  aset  kualifikasian  prepare  the  qualifying  asset  for  its  intended 
sesuai  maksud  penggunaannya  selesai  secara  use are substantially completed. 
substansial. 
     
Aset  jalan  tol  terdiri  dari  jalan  dan  jembatan,    Toll  road  assets  consisting  of  roads  and 
gerbang  dan  bangunan  pelengkap  jalan  tol  dan  bridges, gates and complementary building toll 
sarana pelengkap jalan tol dicatat sebagai aset hak  roads  and  toll  supplementary  facilities  are 
pengusahaan  jalan  tol  yang  dinyatakan  sebesar  recorded  as  toll  road  concession  rights  which 
nilai  wajar  pada  tanggal  revaluasian  dikurangi  are  stated  at  fair  value  at  the  revaluation  
akumulasi  penyusutan  dan  akumulasi  rugi  date  less  accumulated  depreciation  and 
penurunan  nilai  yang  terjadi  setelah  tanggal  accumulated impairment losses that occur after 
revaluasi.  the date of revaluation. 
     
Amortisasi  aset  jalan  dan  jembatan  dilakukan    Amortization  of  asset  roads  and  bridges  were 
dengan  menggunakan  metode  unit  produksi  calculated  using  the  unit  of  production         
(jumlah  lalu  lintas  kendaraan  kendaraan)  selama  (the  amount  of  vehicle  traffic  vehicles)  during 
masa  hak  pengusahaan  jalan  tol  (masa  konsesi).  the  period  of  the  concession  (concession 
Sedangkan  aset  hak  pengusahaan  jalan  tol  selain  period).  While  the  toll  road  concession  rights 
jalan  dan  jembatan  diamortisasi  selama  periode  assets  other  than  roads  and  bridges  are 
yang  lebih  pendek  antara  masa  hak  pengusahaan  amortized  over  the  shorter  period  between   
jalan tol (masa konsesi) dan umur manfaat aset.  the  period  of  concession  (concession  period) 
and the useful life of the asset. 
     
Aset  takberwujud  dihentikan  pengakuannya  jika    Intangible  assets  are  derecognized  when 
dilepas  atau  ketika  tidak  terdapat  lagi  manfaat  removed  or  when  there  are  no  further  future 
ekonomi  masa  depan  yang  diperkirakan  dari  economic benefits are expected from its use or 
penggunaannya  atau  pelepasannya.  Keuntungan  disposal.  Gains  or  losses  arising  from 
atau  kerugian  yang  muncul  dari  penghentian  derecognition  of  an  intangible  asset  is 
pengakuan  aset  tak  berwujud  ditentukan  sebagai  determined  as  the  difference  between  the  net 
selisih  antara  hasil  neto  pelepasan  (jika  ada)  dan  disposal  proceeds  (if  any)  and  the  carrying 
jumlah  tercatat  aset.  Keuntungan  atau  kerugian  amount  of  assets.  Gains  or  losses  are 
diakui  dalam  laba  rugi  ketika  aset  tersebut  recognized  in  profit  or  loss  when  the  asset  is 
dihentikan  pengakuannya.  Keuntungan  diakui  derecognized.  Gains  are  recognized  as  other 
sebagai pendapatan lain-lain.  income. 
     
Pada tanggal 25 Januari  2010 dan tanggal 20 Juni    On  January  25,  2010  and  June  20,  2016, 
2016, Ruas Kanci - Pejagan, Jawa Barat dan Jawa  segment  Kanci  -  Pejagan,  West  Java  and 
Tengah  dan  Ruas  Pejagan-Pemalang,  telah  Central Java and Segment Pejagan-Pemalang, 
beroperasi  secara  komersial.  Amortisasi  Hak  has  been  in  commercial  operation. 
Pengusahaan  Jalan  Tol  dihitung  sampai  Amortization  of  Toll  Road  Concession  Rights 
berakhirnya  hak  konsesi  jalan  tol  hingga  28  Mei  are  calculated  until  the  end  of  the  toll  road 
2041.  concession rights up to May 28, 2041. 
     
r. Penurunan Aset Non-Keuangan Kecuali   r. Impairment of Non-Financial Assets Except
Goodwill Goodwill
 
Pada  setiap  akhir  periode  pelaporan,  Grup  akan    At  the  end  of  the  reporting  period,  the  Group 
melakukan  penilaian  apakah  terdapat  indikasi  aset  will  assess  whether  there  is  an  indication  of 
mengalami  penurunan  nilai.  Jika  terdapat  indikasi  assets  impairment.  If  such  indication  exists,   
tersebut,  maka  Grup  mengestimasi  jumlah  the Group estimates the recoverable amount of 

41
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
terpulihkan suatu aset atau unit penghasil kas yaitu  an  asset  or  cash-generating  unit  is  the  higher 
jumlah yang lebih tinggi antara nilai wajar dikurangi  amount between the fair value less costs to sell 
biaya untuk menjual dan nilai pakainya. Jika jumlah  and value in use. If the recoverable amount of 
terpulihkan  suatu  aset  lebih  kecil  dari  nilai  an  asset  is  less  than  its  carrying  amount,       
tercatatnya,  nilai  tercatat  aset  harus  ditentukan  the  carrying  amount  of  an  asset  should  be 
menjadi  sebesar  jumlah  terpulihkan.  Kerugian  determined  by  the  recoverable  amount. 
penurunan nilai diakui segera dalam laba rugi.  Impairment  loss  is  recognized  immediately  in 
profit or loss. 
     
Pemulihan  rugi  penurunan  nilai  aset  yang  telah    Recovery of impairment losses of assets which 
diakui  periode  sebelumnya  dicatat  jika  terdapat  has  been  recognized  in  prior  periods  are 
indikasi  penurunan  nilai  aset  tersebut  sudah  tidak  recorded  when  there  is  indication  of 
ada  lagi  atau  menurun.  Pemulihan  rugi  penurunan  impairment  of  the  asset  no  longer  exists  or 
nilai  aset  diakui dalam  laba  rugi.  Namun  demikian,  decreases.  Recovery  of  impairment  losses  of 
kenaikan  nilai  tercatat  aset  karena  pemulihan  rugi  assets  are  recognized  in  the  profit  or  loss. 
penurunan  nilai  hanya  diakui  sepanjang  tidak  However,  the increase in the carrying value of 
melebihi  nilai  tercatat  yang  ditentukan  (setelah  assets  due  to  the  recovery  of  an  impairment 
dikurangi  penyusutan  dan  amortisasi)  jika  rugi  loss  is  recognized  only  if  it  does  not  exceed        
penurunan  nilai  aset  tidak  diakui  pada  tahun  the  carrying  amount  that  would  have  been 
sebelumnya.  determined  (after  deducting  depreciation  and 
amortization) if no impairment losses of assets 
recognized in prior years. 
     
Kebijakan  akuntansi  untuk  penurunan  nilai  aset    The  accounting  policy  for  impairment  of 
keuangan dijelaskan dalam Catatan 2g; penurunan  financial  assets  is  discussed in  Note 2g;  while 
nilai untuk goodwill dijelaskan dalam Catatan 2q.  impairment  for  goodwill  is  discussed  in  Note 
2q. 
     
s. Aset Keuangan dari Perjanjian Jasa Konsesi s. Financial Asset from Service Concession
Arrangements
     
WSE  menerapkan  ISAK  16  "Perjanjian  Konsesi  WSE  applies  ISAK  16  “Service  Concession 
Jasa" atas Perjanjian Jual Beli Listrik (PPA) dengan  Arrangements”  on  its  Power  Purchase 
PT Perusahaan Listrik Negara (Persero) (PLN).  Agreement  (PPA)  with  PT  Perusahaan  Listrik 
Negara (Persero) (PLN). 
   
Perjanjian  konsesi  jasa  adalah  perjanjian  dimana  Service  concession  arrangements  are 
pemerintah  atau  badan  lainnya  (pemberi  konsesi)  arrangements  whereby  a  government  or 
memberikan  kontrak  untuk  penyediaan  layanan  another  body  (the  “grantor”)  grants  contracts 
publik  ke  entitas  sektor  swasta  ("operator").  for  the  supply  of  public  services  to  a  private 
Perjanjian  tersebut  sering  disebut  sebagai  sector  entity  (the  “operator”).  This  is  often 
perjanjian 'publik-ke-swasta'.  referred to as a 'public-to-private' arrangement. 
   
Dalam  perjanjian  ini,  operator  membangun  In  this  type  of  arrangement,  an  operator 
infrastruktur  yang  akan  digunakan  untuk  constructs the infrastructure that will be used to 
menyediakan  jasa  publik  dan  mengoperasikan  provide  the  public  service  and  operates  and 
serta mengelola  infrastruktur  tersebut  untuk  jangka  maintains  that  infrastructure  for  a  specified 
waktu  tertentu.  Operator  dibayar  untuk  jasa  yang  period  of  time.  The  operator  is  paid  for          
dibayarkan  selama  periode  perjanjian.  Perjanjian  the  services  over  the  period  of  
diatur oleh suatu kontrak yang menetapkan standar  the  arrangement.  A  contract  sets  out 
kinerja,  mekanisme  penyesuaian  harga,  dan  performance  standards,  pricing  mechanisms, 
pengaturan  untuk  menengahi  perselisihan.  Dalam  and  arrangements  for  arbitrating  disputes.  In 
beberapa  kasus,  operator  dapat  meningkatkan  some  cases,  the  operator  may  upgrade         
infrastruktur yang ada.  the existing infrastructure. 
   
Beberapa  ciri  umum  dari  perjanjian  konsesi  jasa  Some  common  features  of  service concession 
meliputi:  arrangements include: 
   
  Pemberi  konsesi  merupakan  entitas  sektor    The  grantor  is  a  public  sector  entity, 
publik,  termasuk  badan  pemerintah,  atau  including  a  governmental  body,  or  a 
entitas  sektor  swasta  yang  telah  diberikan  private  sector  entity  to  which                 
tanggung jawab atas layanan tersebut.  the responsibility for the service has been 
devolved. 

42
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
  Operator  bertanggung  jawab  setidaknya  atas    The  operator  is  responsible  for  at  least 
sebagian  pengelolaan  infrastruktur  dan  jasa  some  of  the  management  of 
terkait dan tidak hanya bertindak sebagai agen  the infrastructure and related services and 
atas kepentingan pemberi konsesi.  does not merely act as an agent on behalf 
of the grantor. 
     
  Kontrak  menetapkan  harga  awal  yang  akan    The  contract  sets  the  initial  prices  to  be 
dikenakan  oleh  operator  dan  mengatur  levied by the operator and regulates price 
perubahan  harga  selama  periode  perjanjian  revisions  over  the  period  of  the  service 
jasa.  arrangement. 
   
  Operator  diwajibkan  untuk  menyerahkan    The  operator  is  obligated  to  hand  over      
infrastruktur  kepada  pemberi  konsesi  pada  the  infrastructure  to  the  grantor  in  a 
akhir  periode  perjanjian  dalam  kondisi  yang  specified  condition  at  the  end  of 
telah  ditentukan,  dengan  sedikit  atau  tanpa  the period of the arrangement, for little or 
imbalan  tambahan,  terlepas  dari  pihak  yang  no  incremental  consideration  irrespective 
awalnya mendanai infrastruktur.  of which party initially financed it. 
   
Perjanjian Jual Beli Listrik (PPA) yang diungkapkan  The  Power  Purchase  Agreement  (PPA) 
pada  Catatan  23  antara  PLN  dan WSE  memenuhi  disclosed  in  Note  23  between  PLN  and  WSE 
definisi  sebagai  perjanjian  konsesi  jasa  dimana  meets  the  definition  of  a  service  concession 
PLN  bertindak  sebagai  pemberi  konsesi  dan  WSE  arrangement, where PLN acts as a grantor and 
bertindak  sebagai  operator.  WSE  setuju  untuk  WSE  acts  as  the  operator.  WSE  agrees  to 
merancang,  membiayai, membangun,  memiliki  dan  design,  finance,  construct,  own  and  operate  a 
mengoperasikan  fasilitas  pembangkit  listrik  tenaga  mini  hydro  power  generating  facility               
mini hidro ("infrastruktur") dan menjual kepada PLN  (the “infrastructure”) and sell to PLN the power 
energi  yang  dihasilkan  darinya  dengan  syarat  dan  generated  therefrom  on  terms  and  conditions 
kondisi  sebagaimana  disepakati  dalam  PPA.  as  agreed  in  the  PPA.  The  infrastructure  is 
Infrastruktur  digunakan  untuk  seluruh  masa  used for its entire useful life for the purpose of 
manfaatnya  untuk  tujuan  pengaturan  layanan  the service concession arrangement. 
konsesi. 
   
Dalam  ISAK  16  mengatur  prinsip  umum  dalam  Under  ISAK  16  determines  the  general 
pengakuan  hak  dan  kewajiban  terkait  dengan  principles  in  the  recognition and  measurement 
konsesi  jasa,  WSE  tidak  mengakui  infrastruktur  of  liabilities  and  rights  related  to  service 
sebagai  aset  tetap  namun  mengakui  sebagai  aset  concession,  WSE  does  not  recognize           
keuangan,  karena  WSE  memiliki  hak  tanpa  syarat  the  infrastructure  as  property  and  equipment 
untuk menerima kas  dari  PLN  melalui pembayaran  but recognizes it as a financial asset, as WSE 
kapasitas berdasarkan PPA. Aset keuangan dicatat  has an unconditional right to receive cash from 
sebagai  “pinjaman  yang  diberikan  dan  piutang”  PLN  through  the  capacity  payments  under     
sesuai  dengan  PSAK  55,  “Instrumen  Keuangan:  the PPA. The financial asset is accounted as a 
Pengakuan dan Pengukuran”.  “loans and receivables” in accordance to PSAK 
55,  “Financial  Instruments:  Recognition  and 
Measurement”. 
   
ISAK  22  memberikan  panduan  spesifik  mengenai  ISAK  22  provides  specific  guidance  for        
pengungkapan  yang  diperlukan  atas  perjanjian  the  required  disclosures  regarding  the  service 
konsesi jasa.  concession agreement. 
   
WSE  tidak  mengakui  penjualan  kapasitas  listrik,  WSE  does  not  recognize  the  sale  of  electrical 
namun  mengakui  pendapatan  keuangan  (melalui  capacity,  but  recognizes  financial  revenue 
aset  keuangan).  WSE  menghitung  pendapatan  (through the financial asset). WSE accounts for 
yang  terkait  dengan  jasa  operasi  sesuai  dengan  revenue  relating  to  operation  services  in 
PSAK 23, "Pendapatan". WSE mencatat  kewajiban  accordance  with  PSAK  23,  “Revenue”.  WSE 
kontraktual untuk memelihara atau mengembalikan  accounts  for  the  contractual  obligations  to 
infrastruktur  di  lokasi  operasi sesuai  dengan  PSAK  maintain  or  restore  the  infrastructure  in  
57,  Provisi,  Kewajiban  Kontinjensi  dan  Aktiva  the  plant  operations  in  accordance  to  PSAK 
Kontinjensi.  57,  Provisions,  Contingent  Liabilities  and 
Contingent Assets. 
 
 
 
 

43
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
t. Utang Bruto kepada Subkontraktor   t. Gross Amount Due to Subcontractors
 
Utang bruto kepada subkontraktor diakui atas dasar    Gross  amount  due  to  subcontractors  is 
akrual  yang  merupakan  utang  prestasi  kerja  recognised  on  accrual  basis  which  represents 
subkontraktor  yang  belum  diberitaacarakan,  baik  the  uncertified  subcontractor’s  working 
dari  subkontraktor  atau  material  yang  diakui  progress,  either  from  subcontractor  or 
sebagai  prestasi  karena  belum  memenuhi  syarat  materials which are recognized as progress as 
pembayaran  sesuai  kontrak.  Utang  bruto  kepada  it has not fulfilled the certain payment condition 
subkontraktor disajikan sebesar selisih antara biaya  as stated in the contract. Gross amount due to 
yang  terjadi  ditambah  laba  atau  dikurangi  kerugian  subcontractor  is  presented  as  the  differences 
yang diakui.  between  costs  occurred  added  by  income  or 
deducted by realized loss. 
     
u. Pengakuan Pendapatan dan Beban    u. Revenue and Expense Recognition
 
Pendapatan  kontrak  dan  biaya  kontrak  yang    Contract revenue and contract cost associated 
berhubungan  dengan  kontrak  konstruksi  diakui  with  the  construction  contract  are  recognized 
masing-masing  sebagai  pendapatan  dan  beban  as  revenue  and  expense  respectively  by 
dengan  memperhatikan  tahap  penyelesaian  reference  to  the  stage  of  completion  of  
aktivitas  kontrak  pada  tanggal  akhir  periode  the contract activity at the end of the reporting 
pelaporan (metode persentase penyelesaian), yang  period  (percentage  of  completion  method), 
diukur  berdasarkan  kemajuan  fisik  pada  tanggal  which  is  measured  based  on  the  physical 
akhir  periode  pelaporan  yang  dinyatakan  dalam  progress  at  the  end  of  reporting  period,  which 
berita acara penyelesaian pekerjaan eksternal.  is stated on the minutes of external progress of 
completed works. 
 
Jika kemungkinan besar terjadi total beban kontrak    If  it  is  most  likely  to  occur  the  total  contract 
akan  melebihi  pendapatan  kontrak,  maka  taksiran  expenses  will  exceed  contract  revenue,  
rugi segera diakui sebagai beban.  the  estimated  loss  is  recognized  immediately 
as an expense. 
     
Pendapatan  kontrak  terdiri  dari  jumlah  pendapatan    Contract  revenue  comprises  of  the  initial 
semula  yang  disetujui  dalam  kontrak  dan  amount  of  revenue  that  agreed  in the contract 
penyimpangan dalam pekerjaan kontrak, klaim, dan  and  variations  in  contract  work,  claims,  and 
pembayaran  insentif  sepanjang  hal  ini  incentive  payments  to  the  extent  that  is 
memungkinkan  untuk  menghasilkan  pendapatan  probable  to  produce  revenue  and  can  be 
dan dapat diukur dengan andal.  realiably measured. 
     
Biaya  kontrak  terdiri  dari  biaya  yang  berhubungan    Contract  cost  comprises  costs  that  is  related 
langsung  dengan  kontrak,  biaya  yang  dapat  directly  to  the  specific  contract,  costs  that  are 
diatribusikan  pada  aktivitas  kontrak  secara  umum  attributable  to  contract  activity  in  general  and 
dan dapat dialokasikan pada kontrak dan biaya lain  can be allocated to the contract and such other 
yang secara spesifik dapat ditagihkan ke pelanggan  costs specifically can be billed to the customer 
sesuai isi kontrak.  under the terms of the contract. 
     
Pendapatan  dari  usaha  sarana  papan  (properti)    Revenue  from  sales  of  housing  is  recognized 
diakui dengan metode full accrual, yang dinyatakan  by  the  full  accrual  method,  as  stated  in 
dalam  PSAK  44  (Revisi  2010)  “Akuntansi  Aktivitas  PSAK 44  (Revised  2010)  “Accounting  for  Real 
Pengembangan  Real  Estat”,  jika  seluruh  syarat  Estate  Development  Activities”,  if  all                 
dipenuhi:  the following criterias are met: 
     
(i)  Pengikatan jual beli telah berlaku;    (i)  Binding  sale  and  purchase  has  been 
  accepted; 
     
(ii)  Harga  jual  akan  tertagih,  dimana  jumlah    (ii)  The  sales  price  will  be  collected,  where  
pembayaran yang diterima sekurang-kurangnya  the amount of payments already collected 
telah  mencapai  20%  dari  harga  jual  yang  telah  at least 20% of the agreed sale price; 
disepakati; 
     
(iii)  Tagihan  penjual  terhadap  pembeli  pada  masa    (iii)  The seller’s receivable from buyers will not 
yang  akan  datang  bebas  dari  subordinasi  be  subordinated  in  the  future  against 
terhadap utang lain dari pembeli; dan  another loan of the buyer; and 
     
 

44
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
(iv)  Penjual  telah  mengalihkan  risiko  dan  manfaat    (iv)  The  seller  has  transferred  the  risks  and 
kepemilikan  unit  bangunan  kepada  pembeli  ownership benefits to the buyer as follow: 
sebagai berikut:   
     
  Untuk penjualan bangunan rumah beserta      For  the  sale  of  houses  with  land,           
tanah  jika  telah  terjadi  pengalihan  seluruh  if the seller has transferred to the buyer 
risiko  dan  manfaat  kepemilikan  yang  the  risks  and  rewards  of  ownership  
umum  terdapat  pada  suatu  transaksi  in  a  transaction  that  is  in  substance 
penjualan,  dan  penjual  selanjutnya  tidak  and  the  seller  does  not  have  a 
mempunyai  liabilitas  atau  terlibat  lagi  substantial continuing involvement with               
secara  signifikan  dengan  aset  (properti)  the property. In this case the building is 
tersebut. Dalam hal ini bangunan tersebut  ready for use at least. 
telah siap ditempati/digunakan. 
 
  Untuk  penjualan  tanah  yang  pendirian      For  land  sales  where  the  building  will 
bangunannya  akan  dilaksanakan  oleh  be  developed  by  the  buyer  when 
pembeli  jika  selesainya  pengembangan  the  development  of  the  land  is 
lingkungan dimana tanah tersebut berada,  completed  whereas  the  seller  is  not 
yaitu  penjual  tidak  mempunyai  liabilitas  obligated to complete improvements of 
yang  signifikan  lagi  untuk  menyelesaikan  the  land  sold  or  to  construct  other 
lingkungan  seperti  pematangan  tanah  facilities  applicable  to  the  land  sold,  
yang  dijual,  pembangunan  fasilitas  yang  the  agreed  development  of  facilities  or 
dijanjikan  ataupun  yang  menjadi  liabilitas  liability  and  expenses  of  the  seller  in 
dan  beban  penjual,  sesuai  dengan  accordance  with  the  agreement 
perjanjian  antara  penjual  dan  pembeli  between  seller  and  buyer  or  related 
yang  bersangkutan  atau  ketentuan  regulation. 
peraturan  perundang-undangan  yang 
berlaku. 
     
  Apabila semua persyaratan tersebut diatas      If all the above conditions are not met, 
tidak  dipenuhi,  semua  penerimaan  uang  all  payment  received  from  buyers  are 
yang  berasal  dari  pelanggan  dicatat  recognized as unearned revenue using 
sebagai  uang  muka  dari  pelanggan  the deposit  method,  until  all conditions 
dengan  menggunakan  metode  deposit,  are  met.  Expenses  are  recognized 
sampai  semua  persyaratan  dipenuhi.  when  incurred,  with  accrual  method 
Beban diakui pada saat terjadinya, dengan  basis. 
menggunakan dasar akrual. 
     
Pendapatan Tol    Toll Revenues 
     
Pendapatan Grup dari hasil pengoperasian jalan tol    The Group’s revenues from toll road operations 
diakui  pada  saat  penjualan  karcis  tol.  Pendapatan  are  recognized  upon  the  sale  of  toll  tickets. 
tol  dari  hasil  kerjasama  pengoperasian  jalan  tol  Revenue  from  profit  sharing  arrangement 
dengan  investor  dengan  kuasa  penyelenggaraan  between the Group and investor with operating 
diakui  pada  saat  penjualan  karcis  tol  setelah  rights are recognized when toll tickets are sold, 
dikurangi  bagian  investor  tersebut.  Pembayaran  net  of  investor’s  share.  Payments  to  investors 
kepada  investor  tanpa  kuasa  penyelenggaraan  without  operating  rights  are  recorded  as  a 
dicatat  sebagai  angsuran  liabilitas  kerjasama  mandatory  installment  under  joint  operation. 
operasi.  Selisih  antara  jumlah  pembayaran  ini  The  differences  of  total  payments  over 
dengan  angsuran  liabilitas  kerjasama  operasi  mandatory installment under joint operation are 
dicatat sebagai  beban atau penghasilan kerjasama  recorded  as  joint  operation  expense  or 
operasi.  revenue. 
 
v. Biaya Pinjaman    v. Borrowing Costs
 
Biaya  pinjaman  yang  dapat  diatribusikan  langsung    Borrowing costs that are directly attributable to 
dengan  perolehan,  pembangunan  atau  pembuatan  the acquisition, construction or production of a 
aset  kualifikasian,  dikapitalisasi  sebagai  bagian  qualifying  asset,  are  capitalized  as  part  of  
biaya  perolehan  aset  tersebut.  Biaya  pinjaman  the  cost  of  asset.  Other  borrowing  costs  are 
lainnya  diakui  sebagai  beban  pada  saat  terjadi.  recognized  as  an  expense  when  incurred. 
Biaya  pinjaman  dapat  mencakup  beban  bunga,  Borrowing costs may include interest expense, 
beban  keuangan  dalam  sewa  pembiayaan  atau  finance  charges  in  respect  of  finance  leases, 
selisih kurs yang berasal dari pinjaman dalam mata  or  exchange  differences  arising  from  foreign 
uang  asing  sepanjang  selisih  kurs  tersebut  currency borrowings to the extent that they are 
diperlakukan  sebagai  penyesuaian  atas  biaya  regarded as an adjustment to interest costs. 
bunga. 

45
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Kapitalisasi  biaya  pinjaman  dimulai  pada  saat  Grup    Capitalization  of  borrowing  costs  commences 
telah  melakukan  aktivitas  yang  diperlukan  untuk  when  the  Group  undertakes  activities 
mempersiapkan  aset  agar  dapat  digunakan  atau  necessary to prepare the asset for its intended 
dijual  sesuai  dengan  intensinya  serta  pengeluaran  use or sale and expenditures for the asset and 
untuk  aset  dan  biaya  pinjamannya  telah  terjadi.  its  borrowing  costs  has  been  incurred. 
Kapitalisasi biaya pinjaman dihentikan ketika secara  Capitalization of borrowing costs ceases when 
substansial  seluruh  aktivitas  yang  diperlukan  untuk  substantially  all  the  activities  necessary  to 
mempersiapkan  aset  kualifikasian  agar  dapat  prepare  the  qualifying  assets  for  its  intended 
digunakan  atau  dijual  sesuai  dengan  intensinya  use or sale are complete. 
telah selesai. 
     
Konstruksi  yang  termasuk  dalam  perolehan  aset    Construction  included  in  acquisition  of  certain 
tertentu  adalah  proyek-proyek  pre-financing  yang  assets  is  the  pre-financing  projects  whose 
pembangunannya  membutuhkan  waktu  lebih  dari  constructions  time  is  required  more  than  one 
satu tahun.  year. 
     
w. Kombinasi Bisnis   w. Business Combinations
 
Kombinasi  bisnis  adalah  suatu  transaksi  atau    Business combination is a transaction or other 
peristiwa  lain  dimana  pihak  pengakuisisi  events in which an acquirer obtains control of 
memperoleh  pengendalian  atas  satu  atau  lebih  one  or  more  businesses.  Business 
bisnis.  Kombinasi  bisnis  dicatat  dengan  combination  is  accounted  for  by  applying  
menggunakan  metode  akuisisi.  Imbalan  yang  the  acquisition  method.  The  consideration 
dialihkan dalam suatu kombinasi bisnis diukur pada  transferred  in  a  business  combination  is 
nilai wajar, yang dihitung sebagai hasil penjumlahan  measured at fair value, which is computed as 
dari  nilai  wajar  seluruh  aset  yang  dialihkan  oleh  the  sum  of  the  fair  value  of  the  assets 
Grup  pada  tanggal  akuisisi,  liabilitas  yang  diakui  transferred  by  the  Group  at  acquisition  date, 
oleh  Grup  kepada  pemilik  sebelumnya  dari  pihak  liabilities  recognized  by  the  Group  to  former 
yang  diakuisisi,  dan  kepentingan  ekuitas  yang  owners  of  the  acquiree,  and  the  equity 
diterbitkan  oleh  Grup  dalam  pertukaran  interests issued by the Group in exchange for 
pengendalian dari pihak yang diakuisisi. Biaya-biaya  control  of  the  acquiree.  Acquisition-related 
terkait  akuisisi  diakui  sebagai  beban  pada  periode  costs  are  recognized  as  expenses  in  
saat biaya tersebut terjadi dan jasa diterima.  the period in which the costs are incurred and 
the services are rendered. 
     
Pada  tanggal  akuisisi,  aset  teridentifikasi  yang    At  the acquisition  date, the identifiable  assets 
diperoleh dan liabilitas yang diambil alih diakui pada  acquired  and  the  liabilities  assumed  are 
nilai  wajar  kecuali  untuk  aset  dan  liabilitas  tertentu  recognized at  the fair value except  for  certain 
yang diukur sesuai dengan SAK yang relevan.  assets  and  liabilities  that  are  measured  in 
accordance with the relevant SAK. 
     
Komponen kepentingan non-pengendali  pada pihak    Components  of  non-controlling  interests  of  
yang diakuisisi diukur baik pada nilai wajar ataupun  the acquiree are measured either at fair value 
pada  bagian  proporsional  instrumen  kepemilikan  or  according  to  proportional  share  of  the 
yang  ada  dalam  jumlah  yang  diakui  atas  aset  neto  equity  instruments  in  the  recognized  amounts 
teridentifikasi dari pihak diakuisisi.  of the acquiree’s identifiable net assets. 
     
Bila  suatu  kombinasi  bisnis  dilakukan  secara    When  a  business  combination  is  achieved  in 
bertahap,  kepemilikan  terdahulu  Grup  atas  pihak  stages,  the  Group’s  previously  held  equity 
terakuisisi diukur kembali ke nilai wajar pada tanggal  interest  in  the  acquiree  is  remeasured  at  its 
akuisisi dan keuntungan atau kerugiannya, jika ada,  fair  value  at  the  acquisition  date  and  
diakui  dalam  laba  rugi.  Apabila  dalam  periode  the  resulting  gain  or  loss,  if  there  is  any,  is 
sebelumnya,  perubahan  nilai  wajar  yang  berasal  recognized in profit or loss. If in prior periods, 
dari  kepentingan  ekuitasnya  sebelum  tanggal  changes  in  fair  value  of  its  equity  interest  in 
akuisisi  telah  diakui  dalam  penghasilan  the  acquiree  prior  to  the  acquisition  date  had 
komprehensif  lain,  jumlah  tersebut  diakui  dengan  been  recognized  in  other  comprehensive 
dasar  yang  sama  sebagaimana  dipersyaratkan  jika  income,  that  amount  shall  be recognized  with 
Grup  telah  melepas  secara  langsung  kepentingan  the  same  basis  as  would  be  required  had  
ekuitas yang dimiliki sebelumnya.  the  Group  disposed  of  the  previously  held 
equity interest directly. 
     
Jika  akuntansi  awal  untuk  kombinasi  bisnis  belum    If  the  initial  accounting  for  a  business 
selesai  pada  akhir  periode  pelaporan  saat  combination  is  incomplete  by  the  end  of         

46
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
kombinasi  terjadi,  Grup  melaporkan  jumlah  the  reporting  period  in  which  the  combination 
sementara untuk pos-pos yang proses akuntansinya  occurs, the Group reports provisional amounts 
belum selesai dalam laporan keuangannya. Selama  for  the  items  for  which  the  accounting  is 
periode  pengukuran,  Grup  menyesuaikan  secara  incomplete.  During  the  measurement  period, 
retrospektif  jumlah  sementara  tersebut,  dan  the  Group  shall  retrospectively  adjust  those 
mengakui  tambahan  aset  atau  liabilitas,  untuk  provisional  amounts  and  recognize  additional 
mencerminkan  informasi  baru  yang  diperoleh  assets  or  liabilities,  to  reflect  new  information 
tentang  fakta  dan  keadaan  yang  ada  pada  tanggal  obtained  about  facts  and  circumstances  that 
akuisisi,  yang  jika  diketahui,  akan  menyebabkan  existed  as  of  the  acquisition  date  that,  if 
pengakuan  aset  dan  liabilitas  yang  dimaksud  pada  known, would have resulted in the recognition 
tanggal tersebut.  of those assets and liabilities as of that date. 
     
Pada tanggal akuisisi, Grup mengakui goodwill yang    At  acquisition  date,  the  Group  recognizes 
diukur  sebagai  selisih  lebih  antara  (a)  nilai  goodwill  which  is  measured  as  the  excess  of 
gabungan dari imbalan yang dialihkan, jumlah setiap  (a)  the  aggregate  of  the  consideration 
kepentingan  non-pengendali,  dan,  jika  kombinasi  transferred, the amount of any non-controlling 
bisnis  dilakukan  secara  bertahap,  nilai  wajar  pada  interest,  and,  in  a  business  combination 
tanggal  akuisisi  kepentingan  ekuitas  yang  achieved  in  stages,  the  acquisition-date  fair 
sebelumnya dimiliki Grup atas pihak yang diakuisisi;  value  of  the  Group’s  previously  held  equity 
dan  (b)  selisih  jumlah  dari  aset  teridentifikasi  yang  interest  in  the  acquiree;  and  (b)  the  net  of  
diperoleh  dan  liabilitas  yang  diambil  alih  pada  the acquisition-date amounts of the identifiable 
tanggal  akuisisi.  Jika  imbalan  tersebut  kurang  dari  assets acquired and liabilities assumed. If this 
nilai  wajar  aset  neto  pihak  yang  diakuisisi,  selisih  consideration is lower than    the fair value of 
tersebut  diakui  dalam  laporan  laba  rugi  sebagai  the  net  assets  of  the  acquiree,  the  difference 
keuntungan  dari  akuisisi  setelah  sebelumnya  is  recognized  in  profit  or  loss  as  gain  on 
manajemen  menilai  kembali  apakah  telah  bargain  purchase  after  previously  
mengidentifikasi  dengan  tepat  seluruh  aset  yang  the  management  reassesses  whether  it  has 
diperoleh  dan  liabilitas  yang  diambil  alih  serta  correctly  identified  all  of  the  assets  acquired 
mengakui  setiap  aset  atau  liabilitas  tambahan  yang  and  all  of  the  liabilities  assumed  and 
dapat diidentifikasi dalam penelaahan tersebut.  recognize  any  additional  assets  or  liabilities 
that are identified in that review. 
     
Setelah  pengakuan  awal,  goodwill  diukur  pada    Subsequent  to  initial  recognition,  goodwill  is 
jumlah  tercatat  dikurangi  akumulasi  kerugian  measured  at  cost  less  any  accumulated 
penurunan  nilai.  Untuk  tujuan  pengujian  penurunan  impairment  losses.  For  the  purposes  of 
nilai,  goodwill  yang  diperoleh  dari  suatu  kombinasi  impairment  testing,  goodwill  acquired  in  a 
bisnis,  sejak  tanggal  akuisisi,  dialokasikan  kepada  business  combination,  from  the  acquisition 
setiap  Unit  Penghasil  Kas  dari  Grup  yang  date, is allocated to each of the Group’s Cash 
diperkirakan  akan  memberikan  manfaat  dari  sinergi  Generating  Units  that  is  expected  to  benefit 
kombinasi bisnis tersebut, terlepas dari apakah aset  from  the  synergies  of  business  combinations, 
atau  liabilitas  lain  dari  pihak  yang  diakuisisi  regardless of whether other assets or liabilities 
ditempatkan dalam Unit Penghasil Kas tersebut.  of  the  acquiree  are  assigned  to  those  Cash 
Generating Units. 
     
Jika  goodwill  telah  dialokasikan  pada  suatu  Unit    If goodwill was allocated to a Cash Generating 
Penghasil  Kas  dan  operasi  tertentu  atas  Unit  Unit  and  certain  operations  on  the  Cash 
Penghasil  Kas  tersebut  dilepaskan,  maka  goodwill  Generating  Unit  are  disposed,  the  goodwill 
yang  terkait  dengan  operasi  yang  dilepaskan  associated  with  the  disposed  operation  is 
tersebut  termasuk  dalam  jumlah  tercatat  operasi  included  in  the  carrying  amount  of                   
tersebut  ketika  menentukan  keuntungan  atau  the  operation  when  determining  the  gain  or 
kerugian  dari  pelepasan.  Goodwill  yang  dilepaskan  losses  on  disposal.  The  disposed  goodwill  is 
tersebut diukur berdasarkan nilai relatif operasi yang  measured  on  the  basis  of  relative  values  of     
dihentikan  dan  porsi  Unit  Penghasil  Kas  yang  the  disposed  operation  and  the  portion  of     
ditahan.  the Cash Generating Units retained. 
     
Goodwill  awalnya  diukur  pada  harga  perolehan,    Goodwill is initially measured at historical cost, 
yang  merupakan  selisih  lebih  dari  nilai  agregat  the  excess  of  the  aggregate  of                      
imbalan  yang  dialihkan  dan  nilai  yang  diakui  oleh  the  consideration  transferred  and  the  amount 
kepentingan  non-pengendali  dan  nilai  kepentingan  recognized  for  non-controlling  interests,  and 
ekuitas  yang  dimiliki  sebelumnya,  atas  jumlah  neto  any  previous  interest  held,  over  the  net 
dari  aset  teridentifikasi  yang  diperoleh  dan  liabilitas  identifiable  assets  acquired  and  liabilities 
yang  diambil  alih.  Jika  nilai  wajar  dari  jumlah  neto  assumed.  If  the  fair  value  of  net  assets 
aset  yang  diakuisisi  melebihi  nilai  agregat  imbalan  acquired  is  in  excess  of  the  aggregate 
yang dialihkan, Grup menilai kembali apakah semua  consideration  transferred,  the  Group 

47
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
aset  yang  diakuisisi  dan  liabilitas  yang  diambil  alih  reassesses  whether  it  has  correctly  identified 
sudah  diidentifikasi  dengan  benar  dan  memeriksa  all  of  the  assets  acquired  and  all  of  
prosedur yang digunakan untuk mengukur nilai yang  the  liabilities  assumed,  and  reviews  
harus  diakui  pada  tanggal  akuisisi.  Jika  hasil  the procedures used to measure the amounts 
penilaian  kembali  tersebut  masih  menghasilkan  to  be  recognized  at  the  acquisition  date.  
selisih lebih atas nilai wajar dari aset neto diakuisisi  If the reassessment still results in an excess of 
atas  nilai  agregat  imbalan  yang  dialihkan,  maka  the  fair  value  of  net  assets  acquired  over  
keuntungan diakui pada laba rugi.  the  aggregate  consideration  transferred,  then 
the gain is recognized in profit or loss. 
     
Saat  penentuan  imbalan  dari  kombinasi  bisnis    When the determination of consideration from 
termasuk imbalan kontinjensi, imbalan kontinjensi ini  a  business  combination  includes  contingent 
diukur  pada  nilai  wajar  saat  tanggal  akuisisi.  consideration,  it  is  measured  at  its  fair  value 
Imbalan  kontinjensi  diklasifikasikan  sebagai  ekuitas  on  acquisition  date.  Contingent  consideration 
atau  liabilitas  keuangan.  Jumlah  yang  is  classified  either  as  equity  or  a  financial 
diklasifikasikan  sebagai  liabilitas  keuangan  liability.  Amounts  classified  as  a  financial 
selanjutnya  diukur  kembali  pada  nilai  wajar  dimana  liability  are  subsequently  remeasured  to  fair 
perubahan  pada  nilai  wajar  tersebut  diakui  dalam  value with changes in fair value recognized in 
laba  rugi  atau  ketika  penyesuaian  dicatat  diluar  profit  or  loss  when  adjustments  are  recorded 
periode  pengukuran.  Perubahan  pada  nilai  wajar  outside  the  measurement  period.  Changes  in 
imbalan  kontinjensi  yang  memenuhi  persyaratan  the  fair  value  of  the  contingent  consideration 
sebagai  penyesuaian  periode  pengukuran,  that  qualify  as  measurement-period 
disesuaikan  secara  retrospektif,  dengan  adjustments  are  adjusted  retrospectively,  with 
penyesuaian terkait terhadap goodwill. Penyesuaian  corresponding  adjustments  made  against 
periode  pengukuran  adalah  penyesuaian  yang  goodwill.  Measurement-period  adjustments 
timbul dari informasi tambahan yang didapat selama  are  adjustments  that  arise  from  additional 
periode pengukuran, yang tidak boleh melebihi satu  information  obtained  during  the  measurement 
tahun dari tanggal akusisi, tentang fakta dan kondisi  period,  which  cannot  exceed  one  year  from    
yang ada pada saat tanggal akuisisi.  the  acquisition  date,  about  facts  and 
  circumstances  that  existed  at  the  acquisition 
date. 
     
Dalam  suatu  kombinasi  bisnis  yang  dilakukan    In  a  business  combination  that  is  achieved  in 
secara  bertahap,  pihak  pengakuisisi  mengukur  stages, the acquirer remeasures its previously 
kembali  kepentingan  ekuitas  yang  dimiliki  held  equity  interest  in  the  acquiree  at  its 
sebelumnya  pada  pihak  diakuisisi  pada  nilai  wajar  acquisition-date fair value and recognizes gain 
tanggal  akuisisi  dan  mengakui  keuntungan  atau  or loss resulted, if there is any, in profit or loss. 
kerugian yang dihasilkan, jika ada, dalam laba rugi. 
     
Pada  saat  penerapan  awal  PSAK  No.  38             At  the  initial  application  of  PSAK  No.  38 
(Revisi  2012),  seluruh  saldo  Selisih  Nilai            (Revised 2012), all balances of the Difference 
Transaksi  Restrukturisasi  Entitas  Sepengendali  In  Value  of  Restructuring  Transactions  of 
direklasifikasikan  ke  akun  “Tambahan  Modal  Entities  under  Common  Control  was 
Disetor”  pada  laporan  posisi  keuangan  reclassified  to  “Additional  Paid  in  Capital”  in  
konsolidasian.  the  consolidated  statement  of  financial 
position. 
     
x. Pajak Penghasilan   x. Income Taxes 
     
Beban pajak adalah jumlah gabungan pajak kini dan    Tax expense is the aggregate amount included 
pajak  tangguhan  yang  diperhitungkan  dalam  in  the  determinination  of  profit  or  loss  for  the 
menentukan laba rugi pada suatu periode. Pajak kini  period  in  respect  of  the  current  tax  and 
dan pajak tangguhan diakui dalam laba rugi, kecuali  deferred  tax.  Current  tax  and  deferred  tax  is 
pajak  penghasilan  yang  timbul  dari  transaksi  atau  recognized  in  profit  or  loss,  except  for income 
peristiwa  yang  diakui  dalam  penghasilan  tax arising from transactions or events that are 
komprehensif  lain  atau  secara  langsung  di  ekuitas.  recognized  in  other  comprehensive  income  or 
Dalam  hal  ini,  pajak  tersebut  masing-masing  diakui  directly  in  equity.  In  this  case,  the  tax  is 
dalam penghasilan komprehensif lain atau ekuitas.  recognized  in  other  comprehensive  income  or 
equity, respectively. 
     
Beban  pajak  kini  ditentukan  berdasarkan  laba  kena    Current  tax  expense  is  determined  based  on 
pajak  dalam  periode  yang  bersangkutan  yang  the  taxable  income  for  the  year  computed 
dihitung berdasarkan tarif pajak yang berlaku.  using prevailing tax rates. 
     

48
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Jumlah  pajak  kini  untuk  periode  berjalan  dan    The  amount  of  unpaid  current  tax  for  current 
periode  sebelumnya  yang  belum  dibayar  diakui  and prior periods is recognised as a liability. If 
sebagai  liabilitas.  Jika  jumlah  pajak  yang  telah  the  amount  already  paid  in  respect  of  current 
dibayar  untuk  periode  berjalan  dan  periode-periode  and prior periods exceeds the amount due for 
sebelumnya  melebihi  jumlah  pajak  yang  terutang  those periods, the excess shall be recognised 
untuk  periode  tersebut,  maka  kelebihannya  diakui  as an asset. Current  tax liabilities (assets)  for 
sebagai  aset.  Liabilitas  (aset)  pajak  kini  untuk  the  current  and  prior  periods  shall  be 
periode  berjalan  dan  periode  sebelumnya  diukur  measured  at  the  amount  expected  to  be  paid 
sebesar  jumlah  yang  diperkirakan  akan  dibayar  to  (recovered  from)  the  taxation  authorities, 
kepada  (direstitusi  dari)  otoritas  perpajakan,  yang  using  the  tax  rates  (and  tax  laws)  that  have 
dihitung  menggunakan  tarif  pajak  (dan  undang- been  enacted  or  substantively  enacted  by  
undang  pajak)  yang  telah  berlaku  atau  secara  the end of the reporting period. 
substantif  telah  berlaku  pada  akhir  periode 
pelaporan. 
     
Manfaat terkait dengan rugi pajak yang dapat ditarik    Tax  benefits  relating  to  tax  loss  that  can  be 
untuk  memulihkan  pajak  kini  dari  periode  carried  back  to  recover  the  current  tax  of 
sebelumnya  diakui  sebagai  aset.  Aset  pajak  previous  periods  is  recognized  as  an  asset. 
tangguhan diakui  untuk akumulasi rugi pajak belum  Deferred  tax  asset  is  recognized  for  
dikompensasi  dan  kredit  pajak  belum  dimanfaatkan  the  carryforward  of  unused  tax  losses  and 
sepanjang  kemungkinan  besar  laba  kena  pajak  unused  tax  credit  to  the  extent  that  it  is 
masa  depan  akan  tersedia  untuk  dimanfaatkan  probable  that  future  taxable  profit  will  be 
dengan  rugi  pajak  belum  dikompensasi  dan  kredit  available against which the unused tax losses 
pajak belum dimanfaatkan.  and unused tax credits can be utilized. 
     
Seluruh  perbedaan  temporer  kena  pajak  diakui    A  deferred  tax  liability  shall  be  recognized  for 
sebagai  liabilitas  pajak  tangguhan,  kecuali  all taxable temporary differences, except to all 
perbedaan temporer kena pajak yang berasal dari:  taxable temporary differences arises from: 
     
a)  Pengakuan awal goodwill; atau    a)  The initial recognition of goodwill; or 
b)  Pengakuan  awal  aset  atau  liabilitas  dari    b)  The  initial  recognition  of  an  asset  or 
transaksi  yang  bukan  kombinasi  bisnis  dan  liability  in  a  transaction  which  is  not  a 
pada  saat  transaksi  tidak  mempengaruhi  laba  business  combination  and  at  the  time  of                  
akuntansi atau laba kena pajak (rugi pajak).  the  transaction,  does  not  affect  neither 
accounting  profit  nor  taxable  profit              
(tax loss). 
     
Aset  pajak  tangguhan  diakui  untuk  seluruh    A deferred tax asset shall be recognized for all 
perbedaan  temporer  dapat  dikurangkan  sepanjang  deductible temporary differences to the extent 
kemungkinan  besar  laba  kena  pajak  akan  tersedia  that  it  is  probable  that  taxable  profit  will  be 
sehingga  perbedaan  temporer  dapat  dimanfaatkan  available  against  which  the  deductible 
untuk  mengurangi  laba  dimaksud,  kecuali  jika  aset  temporary  difference  can  be  utilised,  unless    
pajak  tangguhan  timbul  dari  pengakuan  awal  aset  the  deferred  tax  asset  arises  from  the  initial 
atau pengakuan awal liabilitas dalam transaksi yang  recognition  of  an  asset  or  liability  in  a 
bukan  kombinasi  bisnis  dan  pada  saat  transaksi  transaction that is not a business combination 
tidak  mempengaruhi  laba  akuntansi  atau  laba  kena  and  at  the  time  of  the  transaction  does  not 
pajak (rugi pajak).  affect neither the accounting profit nor taxable 
profit (tax loss). 
   
Aset  dan  liabilitas  pajak  tangguhan  diukur  dengan  Deferred  tax  assets  and  liabilities  are 
menggunakan  tarif  pajak  yang  diharapkan  berlaku  measured at the tax rates that are expected to 
ketika  aset  dipulihkan  atau  liabilitas  diselesaikan,  apply when the asset is realized or the liability 
berdasarkan  tarif  pajak  (dan  peraturan  pajak)  yang  is  settled,  based  on  tax  rates  (and  tax  laws) 
telah  berlaku  atau  secara  substantif  telah  berlaku  that  have  been  enacted  or  substantively 
pada akhir periode pelaporan. Pengukuran aset dan  enacted  by  the  end  of  the  reporting  period. 
liabilitas  pajak  tangguhan  mencerminkan  The  measurement  of  deferred  tax  assets  and 
konsekuensi  pajak  yang  sesuai  dengan  cara  Grup  liabilities  shall  reflect  the  tax  consequences 
memperkirakan,  pada  akhir  periode  pelaporan,  that  would  follow  from  the  manner  in  which  
untuk  memulihkan  atau  menyelesaikan  jumlah  the Group expects, at the end of the reporting 
tercatat aset dan liabilitasnya.  period,  to  recover  or  settle  the  carrying 
amount of its assets and liabilities. 
   
 
 

49
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Jumlah tercatat aset pajak tangguhan ditelaah ulang  The carrying amount of a deferred tax asset is 
pada  akhir  periode  pelaporan.  Grup  mengurangi  reviewed  at  the  end  of  each  reporting  period. 
jumlah  tercatat  aset  pajak  tangguhan  jika  The  Group  shall  reduce  the  carrying  amount 
kemungkinan  besar  laba  kena  pajak  tidak  lagi  of  a  deferred  tax  asset  if  there  is  a  high 
tersedia  dalam  jumlah  yang  memadai  untuk  probability  that  sufficient  taxable  profit  will  no 
mengkompensasikan  sebagian  atau  seluruh  aset  longer be available to allow the benefit of part 
pajak  tangguhan  tersebut.  Setiap  pengurangan  or  all  of  that  deferred  tax  asset  to  be  utilised. 
tersebut  dilakukan  pembalikan  atas  aset  pajak  Any  such  reduction  shall  be  reversed  to  
tangguhan  hingga  kemungkinan  besar  laba  kena  the  extent  that  it  becomes  probable  that 
pajak yang tersedia jumlahnya memadai.  sufficient taxable profit will be available. 
   
Grup melakukan saling hapus aset pajak tangguhan  The  Group  offsets  deferred  tax  assets  and 
dan liabilitas pajak tangguhan jika dan hanya jika:  deferred tax liabilities if, and only if: 
   
a)  Grup  memiliki  hak  yang  dapat  dipaksakan  a)  The Group has a legally enforceable right 
secara  hukum  untuk  melakukan  saling  hapus  to  offset  deferred  tax  assets  against 
aset  pajak  tangguhan  terhadap  liabilitas  pajak  deferred tax liabilities; and 
tangguhan; dan 
   
b)  Aset  pajak  tangguhan  dan  liabilitas  pajak  b)  The deferred tax assets and liabilities are 
tangguhan  terkait  dengan  pajak  penghasilan  related  to  the  income  taxes  levied  by  
yang  dikenakan  oleh  otoritas  perpajakan  yang  the same taxation authority on either: 
sama atas: 
   
i.  entitas kena pajak yang sama; atau  i.  the same taxable entity; or 
   
ii.  entitas  kena  pajak  yang  berbeda  yang  ii.  different  taxable  entities  that  are 
bermaksud  untuk  memulihkan  aset  dan  intended to  recover current tax assets 
liabilitas  pajak  kini  dengan  dasar  neto,  atau  and  liabilities  with  a  net  basis,  or 
merealisasikan  aset  dan  menyelesaikan  to  realize  the  assets  and  settle 
liabilitas  secara  bersamaan,  pada  setiap  the  liabilities  simultaneously,  in  each 
periode  masa  depan  dimana  jumlah  future  period  in  which  significant 
signifikan  atas  aset  atau  liabilitas  pajak  amounts  of  deferred  tax  assets  or 
tangguhan  diperkirakan  untuk  diselesaikan  liabilities are expected to be settled or 
atau dipulihkan.  recovered. 
   
Grup  melakukan  saling  hapus  atas  aset  pajak  kini  The  Group  offsets  the  current  tax  assets  and 
dan liabilitas pajak kini jika dan hanya jika:  current tax liabilities if, and only if: 
   
a)  Memiliki  hak  yang  dapat  dipaksakan  secara  a)  Has  legally  enforceable  rights  to  offset       
hukum  untuk  melakukan  saling  hapus  atas  the recognized amounts; and 
jumlah yang diakui; dan   
 
b)  Bermaksud  untuk  menyelesaikan  dengan  b)  Intends either  to settle on a net  basis, or 
dasar  neto  atau  merealisasikan  aset  dan  to  realize  the  assets  and  settle  liabilities 
menyelesaikan liabilitas secara bersamaan.  simultaneously. 
     
y. Liabilitas Imbalan Kerja   y. Employee Benefits Liabilities
 
Imbalan Kerja Jangka Pendek  Short-Term Employee Benefits 
   
Imbalan  kerja  jangka  pendek  diakui  ketika  pekerja  Short-term employee benefits are recognized 
telah  memberikan  jasanya  dalam  suatu  periode  when  an  employee  has  rendered  
akuntansi,  sebesar  jumlah  tidak  terdiskonto  dari  service  during  accounting  period,  at  
imbalan kerja jangka pendek yang diharapkan akan  the  undiscounted  amount  of  short-term 
dibayar sebagai imbalan atas jasa tersebut.  employee  benefits  expected  to  be  paid  in 
exchange for that service. 
   
Imbalan  kerja  jangka  pendek  mencakup  antara  lain  Short-term  employee  benefits  include  such 
upah, gaji, bonus dan insentif.  as wages, salaries, bonus and incentive. 
   
 
 

50
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Imbalan Pascakerja  Post-Employment Benefits 
   
Imbalan pascakerja seperti pensiun, uang pisah dan  Post-employment  benefits  such  as 
uang penghargaan masa kerja dihitung berdasarkan  retirement,  severance  and  service  payments 
Undang-Undang  Ketenagakerjaan  No. 13/2003  are  calculated  based  on  Labor  Law  
(”UU No. 13/2003”).  No. 13/2003 (“Law No. 13/2003”). 
   
Grup  mengakui  jumlah  liabilitas  imbalan  pasti  neto  The Group recognizes the amount of the net 
sebesar nilai kini kewajiban imbalan pasti pada akhir  defined benefit liability at the present value of 
periode pelaporan dikurangi nilai wajar aset program  the  defined  benefit  obligation  at  the  end  of    
yang  dihitung  oleh  aktuaris  independen  dengan  the  reporting  period  less  fair  value  of  plan 
menggunakan  metode  Projected  Unit  Credit.  Nilai  assets  which  is  calculated  by  independent 
kini  kewajiban  imbalan  pasti  ditentukan  dengan  actuaries  using  the  Projected  Unit  Credit 
mendiskontokan imbalan tersebut.  method.  Present  value  of  the  benefit 
obligation  determined  is  by  discounting  
the benefit. 
   
Grup  mencatat  tidak  hanya  kewajiban  hukum  The  Group  not  only  records  for  its  legal 
berdasarkan  persyaratan  formal  program  imbalan  obligation under the formal terms of a defined 
pasti,  tetapi  juga  kewajiban  konstruktif  yang  timbul  benefit  plan,  but  also  for  any  constructive 
dari praktik informal entitas.  obligation  that  arises  from  the  entity’s 
informal practices. 
   
Biaya jasa kini, biaya jasa lalu dan keuntungan atau    Current  service  cost,  past  service  cost  and 
kerugian  atas  penyelesaian,  serta  bunga  neto  atas  gain  or  loss  on  settlement,  and  net  interets 
liabilitas (aset) imbalan pasti neto diakui dalam laba  on the net defined benefit liability (asset) are 
rugi.  recognized in profit or loss. 
     
Pengukuran  kembali  atas  liabilitas  (aset)  imbalan    The  remeasurement  of  the  net  defined 
pasti neto yang terdiri dari keuntungan dan kerugian  benefit liabilities (assets) comprises actuarial 
aktuarial,  imbalan  hasil  atas  aset  program  dan  gains  and  losses,  the  return  on  plan  assets 
setiap  perubahan  dampak  atas  aset  diakui  sebagai  and  any  change  in  effect  of  the  asset  are 
penghasilan komprehensif lain.  recognized in other comprehensive income. 
   
Pesangon  Termination Benefits 
   
Grup  mengakui  pesangon  sebagai  liabilitas  dan  The  Group  recognizes  liability  and  expense 
beban pada tanggal yang lebih awal di antara:  for  termination  benefits  at  the  earlier  than                      
the following dates: 
 
(a)  Ketika  Grup  tidak  dapat  lagi  menarik  tawaran  (a)  When  the  Group  no  longer  can 
atas imbalan tersebut; dan  withdraw the offer of those benefits; and 
 
(b)  Ketika  Grup  mengakui  biaya  untuk  (b)  When the Group recognizes costs for a 
restrukturisasi  yang  berada  dalam  ruang  restructuring  within  the  scope  of  PSAK 
lingkup  PSAK  No.  57  dan  melibatkan  No.  57  and  involves  payment  of 
pembayaran pesangon.  termination benefits. 
   
Grup  mengukur  pesangon  pada  saat  pengakuan  The Group measures termination benefits on 
awal,  dan  mengukur  dan  mengakui  perubahan  initial  recognition,  and  measures  and 
selanjutnya, sesuai dengan sifat imbalan kerja.  recognizes  subsequent  changes,  in 
accordance  with  the  nature  of  the  employee 
benefits. 
   
Grup  mengikuti  program  asuransi  pensiun  yang  The Group has a pension insurance program 
diselenggarakan  oleh  PT  Asuransi  Jiwasraya  which is organized by PT Asuransi Jiwasraya 
(Persero).  Sesuai  dengan  UU  No.  13/2003,  Grup  (Persero).  In  accordance  with  the  Law  
berkewajiban  menutupi  kekurangan  pembayaran  No. 13/2003, the Group is obligated to cover  
pensiun  bila  program  yang  ada  sekarang  belum  the  shortage  of  pension  payments  when  
cukup menutupi kewajiban.  the pension plans is currently not sufficient to 
cover liabilities. 
   
 
 

51
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Imbalan Kerja Jangka Panjang Lainnya  Other Long-Term Employee Benefits 
   
Imbalan jangka panjang lain seperti cuti berimbalan  Other long-term benefits such as long service 
jangka  panjang  dihitung  dengan  metode  projected  leave  is  calculated  using  the  projected  unit 
unit credit dan didiskontokan ke nilai kini.  credit  method  and  discounted  to  present 
value. 
   
z. Investasi pada Entitas Asosiasi dan Pengaturan z. Investments in Associates and Joint
Bersama  Arrangement 
   
Entitas Asosiasi  Associates 
   
Entitas  asosiasi  adalah  entitas  dimana  Grup  Associates  are  entities  in  which  the  Group 
memiliki  kekuasaan  untuk  berpartisipasi  dalam  has  the  power  to  participate  in  the  financial 
keputusan  kebijakan  keuangan  dan  operasional  and operating policy decisions of the investee 
investee,  tetapi  tidak  mengendalikan  atau  but has no control or jointly control over those 
mengendalikan  bersama  atas  kebijakan  tersebut  policies (significant influence). 
(pengaruh signifikan).   
   
Investasi  pada  entitas  asosiasi  dicatat  dengan  Investment  in  associates  is  accounted  for 
menggunakan  metode  ekuitas.  Dalam  metode  using  the  equity  method.  Under  the  equity 
ekuitas,  pengakuan  awal  investasi  diakui  sebesar  method,  the  investment  in  an  associate  is 
biaya  perolehan  dan  jumlah  tercatat  ditambah  atau  initially  recognized  at  cost  and  the  carrying 
dikurang  bagian  atas  laba  rugi  investee  setelah  amount  is  added  or  subtracted  by              
tanggal  perolehan.  Bagian  atas  laba  rugi  investee  the  investor’s  share  of  the  profit  or  loss  of       
diakui  dalam  laba  rugi.  Penerimaan  distribusi  dari  the  investee  after  the  date  of  acquisition.      
investee  akan  mengurangi  nilai  tercatat  investasi.  The  investor’s  share  of  the  profit  or  loss  of      
Penyesuaian terhadap jumlah tercatat tersebut juga  the  investee  is  recognized  in  profit  or  loss. 
mungkin  dibutuhkan  untuk  perubahan  dalam  Distributions  received  from  an  investee  will 
proporsi  bagian  investor  atas  investee  yang  timbul  reduce  the  carrying  amount  of  
dari  penghasilan  komprehensif  lain,  termasuk  the  investment.  Adjustments  to  the  carrying 
perubahan yang timbul dari revaluasi aset tetap dan  amount  may  also  be  necessary  for  changes 
selisih penjabaran valuta asing. Bagian investor atas  in  the  investor’s  proportionate  interest  in  
perubahan  tersebut  diakui  dalam  penghasilan  the  investee  arising  from  changes  in  
komprehensif lain.  the  investee’s  other  comprehensive  income, 
including those arising from the revaluation of 
property,  plant  and  equipment  and  from 
foreign  exchange  translation  differences.  
The  investor’s  share  of  those  changes  is 
recognized in other comprehensive income. 
   
Grup  menghentikan  penggunaan  metode  ekuitas  The Group discontinues the use of the equity 
sejak  tanggal  ketika  investasinya  berhenti  menjadi  method  from  the  date  when  its  investment 
investasi pada entitas asosiasi sebagai berikut:  ceases to be an associate as follows: 
   
(a)  Jika investasi menjadi entitas anak, dan  (a)  If  the  investment  becomes  a  subsidiary, 
and 
   
(b)  Jika  sisa  kepentingan  dalam  entitas  asosiasi  (b)  If  the  retained  interest  in  the  former 
merupakan  aset  keuangan,  maka  Grup  associate  is  a  financial  asset,  the  Group 
mengukur sisa kepentingan tersebut pada nilai  measures  the  retained  interest  at  fair 
wajar.  value. 
   
Ketika  Grup  menghentikan  penggunaan  metode  When  the  Group  discontinues  the  use  of         
ekuitas,  Grup  mencatat  seluruh  jumlah  yang  the equity method, the Group accounts for all 
sebelumnya  telah  diakui  dalam  penghasilan  amounts  previously  recognized  in  other 
komprehensif  lain  yang  terkait  dengan  investasi  comprehensive  income  in  relation  to  that 
tersebut menggunakan dasar perlakuan yang sama  investment on the same basis as would have 
dengan  yang  disyaratkan  jika  investee  telah  been  required  if  the  investee  had  directly 
melepaskan  secara  langsung  aset  dan  liabilitas  disposed of the related assets or liabilities. 
terkait. 
   
Pengaturan Bersama  Joint Arrangement 
   
Pengaturan  bersama  adalah  pengaturan  atas  dua  Joint  arrangement  is  an  arrangement  of 
atau  lebih  pihak  yang  memiliki  pengendalian  which two  or  more  parties  have  joint  control, 

52
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
bersama,  yaitu  persetujuan  kontraktual  untuk  i.e. the contractually agreed sharing of control 
berbagi  pengendalian  atas  suatu  pengaturan,  yang  of  an  arrangement,  which  exist  only  when 
hanya  ada  ketika  keputusan  mengenai  aktivitas  decisions about the relevant activities require 
relevan  mensyaratkan  persetujuan  dengan  suara  the unanimous consent of the parties sharing 
bulat dari seluruh pihak yang berbagi pengendalian.  control. 

Grup  mengklasifikasikan  pengaturan  bersama  The Group classifies joint arrangement as: 


sebagai: 
   
1)  Operasi Bersama  1)  Joint Operation 
   
Merupakan pengaturan bersama yang mengatur  Represents  joint  arrangement  whereby  
bahwa  para  pihak  yang  memiliki  pengendalian  the  parties  that  have  joint  control  of  
bersama  atas  pengaturan  memiliki  hak  atas  the  arrangement  have  rights  to  
aset  dan  kewajiban  terhadap  liabilitas,  terkait  the  assets,  and  obligations  for  
dengan  pengaturan  tersebut.  Para  pihak  the liabilities, relating to the arrangement. 
tersebut disebut operator bersama.  Those parties are called joint operator. 
   
Operator  bersama  mengakui  hal  berikut  terkait  A  joint  operator  recognizes  in  relation  to 
dengan  kepentingannya  dalam  operasi  its interest in a joint operation: 
bersama: 
 
(a)  Aset, mencakup bagiannya atas setiap aset  (a)  Its  assets,  including  its  share  of  any 
yang dimiliki bersama;  assets held jointly; 
(b)  Liabilitas,  mencakup  bagiannya  atas  (b)  Its liabilities, including its share of any 
liabilitas yang terjadi bersama;  liabilities incurred jointly; 
(c)  Pendapatan  dari  penjualan  bagiannya  atas  (c)  Its revenue from the sale of its share 
output  yang  dihasilkan  dari  operasi  of  the  output  arising  from  the  joint 
bersama;  operation; 
(d)  Bagian  atas  pendapatan  dari  penjualan  (d)  Its share of the revenue from the sale 
output oleh operasi bersama; dan  of  the  output  by  the  joint  operation; 
  and  
(e)  Beban,  mencakup  bagiannya  atas  setiap  (e)  Its  expenses,  including  its  share  of 
beban yang terjadi secara bersama-sama.  any expenses incurred jointly. 
   
2)  Ventura Bersama  2)  Joint Venture 
   
Grup  mengklasifikasikan  pengaturan  bersama  The  Group  classifies  joint  arrangement 
sebagai ventura bersama yang mengatur bahwa  as  a  joint  venture  whereby  the  parties 
para pihak yang memiliki pengendalian bersama  that  have  joint  control  of  
atas  pengaturan  memiliki  hak  atas  aset  neto  the  arrangement  have  rights  to  the  net 
pengaturan  tersebut.  Para  pihak  tersebut  assets  of  the  arrangement.  Those 
disebut sebagai venturer bersama.  parties are called joint venturers. 
   
Venturer  bersama  mengakui  kepentingannya  A joint venturer recognizes its interest in a 
dalam  ventura  bersama  sebagai  investasi  dan  joint  venture  as  an  investment  and 
mencatat  investasi  tersebut  dengan  account  for  that  investment  using  
menggunakan  metode  ekuitas.  Konsolidasi  the  equity  method.  Proportional 
proporsional tidak diizinkan.  consolidation  of  joint  arrangements  is  no 
longer permitted. 
   
Bagian Grup atas laba atau rugi entitas asosiasi  The  Group’s  share  of  post-acquisition 
pasca  akuisisi  diakui  dalam  laporan  laba  rugi  profits or losses is recognized in the profit 
dan  bagian  atas  mutasi  penghasilan  or  loss  and  its  share  of  post-acquisition 
komprehensif  lain-lain  pasca  akuisisi  diakui  movements  in  other  comprehensive 
di dalam  penghasilan  komprehensif  lain  dan  income  is  recognized  in  other 
diikuti dengan penyesuaian pada jumlah tercatat  comprehensive  income  with  a 
investasi.  Dividen  yang  akan  diterima  dari  corresponding  adjustment  to  the  carrying 
entitas  asosiasi  diakui  sebagai  pengurang  amount  of  the  investment.  Dividends 
jumlah tercatat investasi. Jika bagian Grup atas  receivable  from  associates  are 
kerugian  entitas  asosiasi  sama  dengan  atau  recognized as a reduction in the carrying 
melebihi  kepentingannya  pada  entitas  asosiasi,  amount  of  the  investment.  When  
termasuk  piutang  tanpa  agunan,  Grup  the  Group’s  share  of  losses  in  an 
menghentikan  pengakuan  bagian  kerugiannya,  associate equal or exceeds its interest in 
kecuali  Grup  memiliki  kewajiban  atau  the  associate,  including  any  other 
melakukan  pembayaran  atas  nama  entitas  unsecured  receivables,  the  Group  does 
asosiasi.  not recognize further losses, unless it has 

53
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
incurred  legal  or  constructive  obligations 
or  made  payments  on  behalf  of  
the associates. 

Kerugian  yang  melebihi  nilai  tercatat  investasi  Loss  exceeding  the  carrying  value  of  
tidak  diakui,  kecuali  bila  Grup  mempunyai  the  investment  is  not  recognized,  unless  
komitmen untuk memberikan bantuan keuangan  the  Group  has  committed  to  provide 
atau menjamin kewajiban entitas asosiasi.  financial  support  or  guarantee                  
the associates’ obligation. 
   
Laba  dan  rugi  yang  dihasilkan  dari  transaksi  Profits  and  losses  resulting  from 
hulu  dan  hilir  antara  Grup  dengan  entitas  upstream  and  downstream  transactions 
asosiasi  diakui  dalam  laporan  keuangan  between the Group and its associates are 
konsolidasian  Grup  hanya  sebesar  bagian  recognized  in  the  Group’s  consolidated 
investor lain dalam entitas asosiasi.  financial  statements  only  to  the  extent  of 
the  unrelated  investor’s  interests  in          
the associates. 
   
Dalam  akuntansi  metode  ekuitas,  kepentingan  Under  the  equity  method  of  accounting, 
dalam  ventura  bersama  diakui  pada  biaya  interests  in  joint  ventures  are  initially 
perolehan  dan  disesuaikan  selanjutnya  untuk  recognized  at  cost  and  adjusted 
mengakui  bagian  Grup  atas  laba  rugi  dan  thereafter to recognize the Group’s share 
penghasilan komperhensif lain pasca perolehan.  of  profits  or  losses  and  other 
Ketika  bagian  grup  atas  rugi  dalam  ventura  comprehensive  income  post  acquisition. 
bersama  sama  dengan  atau  melebihi  When  the  Group’s  share  of  losses  in  a 
kepentingannya  dalam  ventura  bersama  joint  venture  equals  or  exceeds  its 
(dimana termasuk kepentingan jangka  panjang,  interests  in  the  joint  ventures  (which 
dalam  substansinya  membentuk  bagian  dari  includes  any  long-term  interests  that,  in 
investasi  bersih  Grup  dalam  ventura  bersama),  substance,  form  part  of  the  Group’s  net 
Grup  tidak  mengakui  kerugian  selanjutnya,  investment  in  the  joint  ventures),  
kecuali  telah  menjadi  kewajiban  atau  telah  the  Group  does  not  recognize  further 
melakukan  pembayaran  atas  nama  ventura  losses,  unless  it  has  incurred  obligations 
bersama.  or  made  payments  on  behalf  of  the  joint 
ventures. 
   
Keuntungan  yang  belum  terealisasi  atas  Unrealized gains on transactions between  
transaksi  antara  Grup  dan  ventura  bersama  the  Group  and  its  joint  ventures  are 
dieliminasi  sebesar  kepentingan  Grup  dalam  eliminated  to  the  extent  of  the  group’s 
ventura  bersama.  Kerugian  yang  belum  interest  in  the  joint  ventures.  Unrealized 
terealisasi  juga  dieliminasi  kecuali  transaksi  losses  are  also  eliminated  unless             
tersebut  memberikan  bukti  adanya  penurunan  the  transaction  provides  evidence  of  an 
nilai  aset  yang  dialihkan.  Kebijakan  akuntansi  impairment  of  the  asset  transferred. 
ventura  bersama  telah  diubah  jika  diperlukan  Accounting  policies  of  the  joint  ventures 
untuk  memastikan  konsistensi  dari  kebijakan  have  been  changed  where  necessary  to 
yang diterapkan oleh Grup.  ensure  consistency  with  the  policies 
adopted by the Group. 
   
aa. Investasi Jangka Panjang Lainnya  aa. Other Long-Term Investment 
   
Merupakan  investasi  saham  dengan  kepemilikan  Represent  a  shares  investment  with  an 
kurang  dari  20%  atau  tidak  memiliki  pengaruh  ownership  less  than  20%  or  does  not  have 
signifikan  yang  pada  awalnya  diakui  sebesar  nilai  significant  influence  that  are  recognized 
wajar  ditambah  dengan  biaya  transaksi.  Bukti  initially  at  fair  value  plus  transaction  costs. 
terbaik dari nilai wajar adalah harga kuotasi dipasar  The best evidence of fair value is the current 
aktif.  market price quotations. 
   
Selanjutnya  investasi  saham  yang  tidak  memiliki  Furthermore,  share  investments  that  do  not 
kuotasi  harga  dipasar  aktif  dan  nilai  wajarnya  tidak  have  an  active  market  price  quotations  and 
dapat  diukur  secara  handal,  diukur  dengan  biaya  their  fair  values  can  not  be  reliably 
perolehan.  measured, are measured at cost. 
   
Pada setiap tanggal laporan keuangan, Perusahaan  At  each  reporting  date,  the  Company 
mengevaluasi  apakah  terdapat  bukti  objektif  bahwa  evaluates  whether  there  is  objective 
suatu investasi mengalami penurunan nilai.  evidence that an investment is impaired. 
   
 
 

54
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Jika  terdapat  bukti  objektif  bahwa  suatu  investasi  If  there  is  an  objective  evidence  that  an 
mengalami  penurunan  nilai,  penurunan  tersebut  investment  is  impaired,  the  decline  is 
dibebankan dalam laporan laba rugi komprehensif di  charged  to  the  statement  of  comprehensive 
tahun berjalan.  income in the current year. 

bb. Laba per Saham  bb. Earning per Share 

Laba  per  saham  dasar  dihitung  dengan  membagi  Basic  earnings  per  share  is  computed  by 
laba  bersih  diatribusikan  kepada  pemegang  saham  dividing  net  income  attributable  to  the  owner 
biasa  entitas  induk  dengan  jumlah  rata-rata  of  the  common  shareholders parent  entity  by 
tertimbang saham yang beredar dalam satu periode. the  weighted  average  number  of  shares 
outstanding during the period.
   
Jika  jumlah  saham  biasa  atau  instrumen  keuangan  If  the  number  of  ordinary  shares  or  potential 
berpotensi  saham  biasa  yang  beredar  meningkat  financial  instruments  to  be  ordinary  shares 
sebagai  akibat  dari  kapitalisasi,  penerbitan  saham  outstanding  increases  as  a  result  of 
bonus  atau  pemecahan  saham,  atau  menurun  capitalisation,  bonus  issue  or  share  split,  or 
sebagai  akibat  dari  penggabungan  saham,  decreases as a result of a reverse share split, 
perhitungan  laba  per  saham  dasar  dan  dilusian  the  calculation  of  basic  and  diluted  earnings 
untuk  seluruh  periode  yang  disajikan  harus  per  share  for  all  periods  presented  shall  be 
disesuaikan secara retrospektif. adjusted retrospectively.

Jumlah  rata-rata  tertimbang  saham  beredar  untuk  The  number  of  weighted  average  shares 
perhitungan  laba  per  saham  dasar  adalah  sebesar  outstanding  for  the  calculation  of  basic 
13.573.902.600 lembar per 30 September 2019 dan  earnings  per  share  amounted  to 
31 Desember 2018 (Catatan 48). 13,573,902,600  as  of  September  30,  2019 
and  December  31,  2018,  respectively  (Note 
48). 
   
cc. Biaya Emisi Obligasi dan Saham cc. Bond and Shares Issuance Costs
   
Biaya  emisi  obligasi  merupakan  biaya  transaksi  Bond issuance  costs  are  transaction  costs  to 
yang  harus  dikurangkan  langsung  dari  hasil  emisi  be  deducted  from  the  proceeds  in  order  to 
dalam  rangka  menentukan  hasil  emisi  bersih  determine  the  net  proceeds  of  bonds.           
obligasi.  Selisih  antara  hasil  emisi  bersih  dengan  The difference between the net proceeds and 
nilai nominal merupakan diskonto atau premium dan  the  nominal  value  is  a  discount  or  premium 
diamortisasi  selama  jangka  waktu  obligasi  yang  and  will  be  amortized  over  the  term  of  
bersangkutan. the bonds.
   
Biaya  emisi  saham  disajikan  sebagai  bagian  Share  issuance  costs  are  presented  as  an 
tambahan  modal  disetor  dan  tidak  diamortisasi.  additional  paid  in  capital  and  are  not 
Biaya  emisi  saham  disajikan  sebagai  pengurang  amortized.  Share  issuance  costs  are 
dari tambahan modal disetor dan tidak diamortisasi.  presented  as  a  deduction  from  the  additional 
paid-in capital and not amortized. 
   
dd. Segmen Operasi dd. Operating Segment 
   
Grup  menyajikan  segmen  operasi  berdasarkan  Group  presented  operating  segments  based 
informasi keuangan yang digunakan oleh pengambil  on the financial information used by the chief 
keputusan  operasional  dalam  menilai  kinerja  operating  decision  maker  in  assessing  
segmen dan menentukan alokasi sumber daya yang  the  performance  of  segments  and  in  
dimilikinya.  Segmen  didasarkan  pada  aktivitas  dari  the allocation of resources. The segments are 
setiap kegiatan operasi entitas legal di dalam Grup.  based on the activities of each operating legal 
entities within the Group. 
   
Segmen  operasi  adalah  suatu  komponen  dari  An  operating  segment  is  a  component  of        
entitas:  the entity: 
   
  yang  terlibat  dalam  aktivitas  bisnis  yang    that  engages  in  business  activities  from 
memperoleh  pendapatan  dan  menimbulkan  which  it  may  earn  revenues  and  incur 
beban  (termasuk  pendapatan  dan  beban  yang  expenses  (including  revenues  and 
terkait dengan transaksi dengan komponen lain  expenses  relating  to  the  transactions 
dari entitas yang sama);  with  other  components  of  the  same 
entity); 
  yang  hasil  operasinya  dikaji  ulang  secara    whose  operating  results  are  regularly 
regular  oleh  pengambil  keputusan  operasional  reviewed  by  chief  operating  decision 

55
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
untuk  membuat  keputusan  tentang  sumber  maker  to  make  decisions  about 
daya  yang  dialokasikan  pada  segmen  tersebut  resources  to  be  allocated  to  
dan menilai kinerjanya; dan  the  segment  and  assesses  its 
performance; and 
 
  yang  informasi  keuangan  yang  terpisah    for  which  separate  financial  information 
miliknya tersedia.  is available. 

ee. Program Opsi Kepemilikan Saham Manajemen ee. Management and Employee Stock Option
dan Karyawan (MESOP)  Program (MESOP) 
   
Perusahaan  menyediakan  program  opsi  saham  The Company provides stock option program 
untuk  karyawan  yang  berhak  dan  anggota  to  their  eligible  employees  and  members  of 
manajemen  (MESOP).  Program  ini  terdiri  dari  management  (MESOP).  This  program 
program  opsi  saham  bahwa  setelah  diselesaikan  consists  of  stock  option  plan  that  upon 
melalui penerbitan saham (pengaturan pembayaran  exercise is settled through issuance of shares 
saham yang diselesaikan dengan instrumen ekuitas)  (equity  –  settled  share  based  payment 
dicatat  sebagai  transaksi  ekuitas.  Pembayaran  arrangement)  which  is  accounted  as  equity 
berbasis  saham  yang  diselesaikan  dengan  transaction.  Equity  -  settled  share  based 
instrumen  ekuitas  kepada  anggota manajemen  dan  payments  to  member  of  management  and 
layanan  sejenis  lainnya  diukur  pada  nilai  wajar  others  providing  similar  services  are 
instrumen ekuitas pada tanggal pemberian opsi.  measured  at  the  fair  value  of  the  equity 
instruments at the grant date. 
   
Nilai wajar yang ditentukan pada tanggal pemberian  The fair value determined at the grant date of 
opsi  pembayaran  saham  yang  diselesaikan  dengan  the  equity  -  settled  share  based  payments  is 
instrumen  ekuitas  dicatat  sebagai  beban  dengan  expensed  on  a  straight-line  basis  over  
metode  garis  lurus  sepanjang  periode  vesting,  the  vesting  period,  based  on  the  Company’s 
berdasarkan estimasi instrumen ekuitas Perusahaan  estimate  of  equity  instruments  that  will 
yang  akhirnya  akan  diberikan,  dengan  peningkatan  eventually  vest,  with  a  corresponding 
yang sesuai pada ekuitas.  increase in equity.  
   
Pada  setiap  akhir  periode  pelaporan,  Perusahaan  At  the  end  of  each  reporting  period,  
mengubah  estimasi  dari  jumlah  instrumen  ekuitas  the  Company  revises  its  estimate  of                
yang  diharapkan  akan  diberikan.  Dampak  dari  the number of equity instruments expected to 
perubahan  atas  estimasi  awal,  jika  ada,  diakui  vest. The impact of the revision of the original 
dalam laporan laba rugi komprehensif sebagai biaya  estimates,  if  there  is  any,  is  recognised  in 
kumulatif  yang  mencerminkan  perubahan  estimasi,  statements  of  comprehensive  income  such 
dengan  penyesuaian  berdasarkan  cadangan  that  the  cumulative  expense  reflects  
imbalan  kerja  yang  diselesaikan  dengan  instrumen  the  revised  estimate,  with  a  corresponding 
ekuitas.  adjustment  to  the  equity-settled  employee 
benefits reserve. 
   
ff. Sumber Ketidakpastian Estimasi dan ff. Source of Estimation Uncertainty and
Pertimbangan Akuntansi Penting  Critical Accounting Judgements 
   
Dalam  penerapan  kebijakan  akuntansi  Grup  diatas,  In  the  application  of  the  Group’s  accounting 
Direksi  diwajibkan  untuk  membuat  penilaian,  policies  above,  the  Directors  are  required  to 
estimasi  dan  asumsi  tentang  jumlah  tercatat  aset  make judgments,  estimates  and  assumptions 
dan  liabilitas  yang  tidak  tersedia  dari  sumber  lain.  about  the  carrying  amounts  of  assets  and 
Estimasi  dan  asumsi  yang  terkait  didasarkan  pada  liabilities  that  are  not  readily  apparent  from 
pengalaman  historis  dan  faktor-faktor  lain  yang  other  sources.  The  estimates and associated 
dianggap relevan. Hasil aktualnya mungkin berbeda  assumptions  are  based  on  historical 
dari estimasi tersebut.  experience  and  other  factors  that  are 
considered to be relevant. Actual results may 
differ from these estimates. 
   
Estimasi  dan  asumsi  yang  mendasari  ditelaah  The  estimates  and  underlying  assumptions 
secara  berkelanjutan.  Revisi  estimasi  akuntansi  are reviewed on an ongoing basis. Revisions 
diakui  dalam  periode  yang  perkiraan  tersebut  to  accounting  estimates  are  recognised  in          
direvisi  jika  revisi  hanya mempengaruhi  periode  itu,  the  period  which  the  estimate  is  revised  if      
atau  pada  periode  revisi  dan  periode  masa  depan  the  revision  affects  only  that  period,  or  in       
jika revisi mempengaruhi kedua periode saat ini dan  the period of the revision and future periods if 
masa depan.  the  revision  affects  both  current  and  future 
periods. 

56
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pertimbangan Kritis dalam Penerapan Kebijakan Critical Judgments in Applying Accounting
Akuntansi Policies
   
 Dalam proses penerapan kebijakan akuntansi yang  In  the  process  of  applying  the  accounting 
dijelaskan  diatas, terdapat  pertimbangan kritis  yang  policies as described above, management has 
memiliki dampak signifikan pada jumlah yang diakui  made  any  critical  judgments  that  have 
dalam  laporan  keuangan  konsolidasian,  selain  dari  significant  impact  on  the  amounts  recognised 
penyajian perkiraan yang diatur di bawah ini.  in the consolidated financial statements, apart 
from  those  involving  estimates,  which  are 
dealt with below. 
   
Perjanjian Konsesi Jasa  Service Concession Arrangement 
   
 ISAK  16  menjelaskan  pendekatan  untuk  ISAK  16  outlines  an  approach  to  account  for 
membukukan  perjanjian  konsesi  jasa  akibat  dari  service  concession  arrangement  arising  from 
penyediaan  jasa  kepada  publik.  ISAK  16  mengatur  entities  providing  public  services.  It  provides 
bahwa operator (pihak penerima konsesi jasa) tidak  that the operator (concession right beneficiary) 
membukukan  infrastruktur  sebagai  aset  tetap,  should  not  account  for  the  infrastructure  as 
namun diakui sebagai aset keuangan dan/atau aset  property  and  equipment,  but  should  be 
tak  berwujud.  Badan  Pengatur  Jalan  Tol  (BPJT)  recognized  as  a  financial  asset  and/or  an 
memberikan  hak,  kewajiban  dan  keistimewaan  intangible asset. Indonesia Toll Road Authority 
kepada  Grup  termasuk  kewenangan  dalam  (BPJT)  granted  the  Group  the  rights, 
pendanaan,  desain,  konstruksi,  operasi  dan  obligations  and  privileges  including  
pemeliharaan  jalan  tol.  Pada  akhir  masa  konsesi  the  authority  to  finance,  design,  construct, 
jasa,  Grup  harus  menyerahkan  jalan  tol  kepada  operate  and  maintain  the  toll  roads.  Upon 
BPJT  tanpa  biaya,  dalam  keadaan  beroperasional  expiry  of  the  service  concession  period,  
dan  kondisi  yang  baik,  termasuk  setiap  dan  semua  the  Group  shall  handover  the  toll  roads  to  
tanah yang diperlukan, pekerjaan, fasilitas jalan dan  the BPJT without cost, fully operational and in 
peralatan  tol  yang  secara  langsung  berkaitan  dan  good  working  condition,  including  any  and  all 
berhubungan  dengan  pengoperasian  fasilitas  jalan  existing  land,  works,  toll  road  facilities  and 
tol.  Grup  berpendapat  bahwa  Perjanjian  equipment  found  therein  directly  related  to, 
Pengusahaan  Jalan  Tol  (PPJT)  memenuhi  kriteria  and in connection with, the operation of the toll 
sebagai  model  aset  takberwujud,  di  mana  aset  road facilities. The Group has made judgment 
konsesi  diakui  sebagai  aset  tak  berwujud  sesuai  that  the  Toll  Road  Concession  Agreement 
dengan PSAK 19, “Aset Takberwujud”.  (PPJT)  qualifies  under  the  intangible  asset 
model,  wherein  the  concession  asset  is 
recognized  as  an  intangible  asset  in 
accordance  with  PSAK  19,  “Intangible 
Assets”. 
   
WTR (entitas anak) yang memiliki hak pengusahaan  WTR  (subsidiary)  who  has  the  toll  road 
jalan tol diharuskan oleh ISAK 16 untuk menyajikan  concession is required by ISAK 16 to  present 
unsur  pendapatan  yang  merefleksikan  pendapatan  an  income  line  reflecting  the  income  from 
dari  jasa  konstruksi  atas  aset  konsesi  atau  construction  or  improvements  to  concession 
peningkatan  kemampuan  aset  konsesi  yang  assets  made  during  the  period  in                    
dilakukan  selama  periode  berjalan  pada  laporan  the  consolidated  statement  of  profit  or  loss 
laba  rugi  dan  penghasilan  komprehensif  lain  and  other  comprehensive  income.  WTR 
konsolidasian.  WTR  mengakui  pendapatan  recognizes  construction  revenues  of 
konstruksi aset konsesi dan biaya konstruksi sesuai  concession  asset  and  construction  costs  in 
dengan  PSAK  34.  Entitas  anak,  WTR  mengukur  accordance  with  PSAK  34.  Subsidiary,  WTR 
pendapatan  konstruksi  atas  aset  konsesi  dengan  measures  construction  revenues  at  cost  with 
menggunakan  metode  biaya  dengan  marjin  nol  zero margin based on management estimation 
berdasarkan  estimasi  terbaik  manajemen  yang  calculated  by  a  certain  model,  in  determining 
dihitung  dengan  model  tertentu  pada  saat  the  initial  toll  road  tariff  before  the  toll  road  is 
penentuan  tarif  awal  jalan  tol  sebelum  jalan  tol  operated. 
dioperasikan. 
 
Sumber Ketidakpastian Estimasi Key Sources of Estimation Uncertainty
   
Rugi  Penurunan  Nilai  Pinjaman  yang  Diberikan  dan  Impairment Loss on Loans and Receivables 
Piutang 
   
Grup  menilai  penurunan  nilai  pinjaman  yang  The Group assesses its loans and receivables 
diberikan  dan  piutang  pada  setiap  tanggal  for impairment at each reporting date. The fair 
pelaporan.  Nilai  wajar  piutang  ditentukan  dengan  value  of  accounts  receivable  is  determined  by 

57
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
memperhitungkan  penurunan  nilai  yang  bersifat  calculating  the  permanent  impairment  and             
permanen  dan  nilai  tercatatnya  dikurangi  untuk  the  carrying  value  is  reduced  to  recognize     
mengakui  penurunan  tersebut.  Asumsi  yang  the  decline.  The  assumptions  used  to 
digunakan untuk menentukan penyisihan penurunan  determine  the  allowance  for  impairment  of 
nilai  piutang  didasarkan  penilaian  secara  individual  receivables  based  on  an  individual 
atas piutang masing-masing debitur (pemberi kerja).  assessment  of  each  receivable  debtor 
(employer). 
   
Taksiran Masa Manfaat Ekonomis Aset Tetap  Estimated  Useful  Lives  of  Property  and 
Equipment 
   
 Masa  manfaat  setiap  aset  tetap  Grup  ditentukan  The  useful  life  of  each  item  of  the  Group’s 
berdasarkan  kegunaan  yang  diharapkan  dari  property  and  equipment  are  estimated  based 
penggunaan  aset  tersebut.  Estimasi  ini  ditentukan  on the period over which the asset is expected 
berdasarkan  evaluasi  teknis  internal  dan  to  be  available  for  use.  Such  estimation  is 
pengalaman atas aset sejenis. Masa manfaat setiap  based  on  internal  technical  evaluation  and 
aset direviu secara periodik dan disesuaikan apabila  experience  with  similar  assets.  The  estimated 
prakiraan  berbeda  dengan  estimasi  sebelumnya  useful  life  of  each  asset  is  reviewed 
karena  keausan,  keusangan  teknis  dan  komersial,  periodically  and  updated  if  expectations  differ 
hukum  atau  keterbatasan  lainnya  atas  pemakaian  from  previous  estimates  due  to  physical  wear 
aset.  Namun  terdapat  kemungkinan  bahwa  hasil  and  tear,  technical  or  commercial 
operasi  dimasa  mendatang  dapat  dipengaruhi  obsolescence  and  legal  or  other  limits  on  
secara  signifikan  oleh  perubahan  atas  jumlah  serta  the  use  of  the  asset.  It  is  possible,  however, 
periode  pencatatan  biaya  yang  diakibatkan  oleh  that  future  results  of  operations  could  be 
perubahan faktor yang disebutkan di atas.  materially affected  by changes  in  the  amounts 
and timing of recorded expenses brought about 
by changes in the factors mentioned above. 
   
Perubahan  masa  manfaat  aset  tetap  dapat  A  change  in  the  estimated  useful  life  of  any 
mempengaruhi  jumlah  biaya  penyusutan  yang  item  of  property  and  equipment  would  affect  
diakui dan penurunan nilai tercatat aset tetap.  the  recorded  depreciation  expense  and 
decrease in the carrying values of property and 
equipment. 
 

   
 Provisi Pelapisan Jalan Tol  Provision for Overlay 
   
Biaya  pelapisan  ini  akan  dicadangkan  secara  The  provision  for  overlay  is  detemined 
berkala  berdasarkan  estimasi  seiring  dengan  periodically  based  on  the  estimated  utilization 
penggunaan jalan tol oleh pelanggan. Provisi diukur  of  toll  road  by  customers.  This  provision  is 
dengan nilai kini atas estimasi manajemen terhadap  measured  using  the  present  value  of  
pengeluaran  yang  diperlukan  untuk  menyelesaikan  the  management‘s  estimate  of  the 
liabilitas kini pada tanggal pelaporan.  expenditures  required  to  settle  present 
obligation at            the reporting date. 
   
 Liabilitas Imbalan Pasca Kerja  Post-Employment Benefits Obligation 
   
Nilai  kini  liabilitas  imbalan  pascakerja  tergantung  The  present  value  of  post  employment  benefit 
pada beberapa faktor yang ditentukan dengan dasar  liabilities depends on several factors which are 
aktuarial  berdasarkan  beberapa  asumsi.  Asumsi  determined by actuarial basis based on several 
yang  digunakan  untuk  menentukan  biaya  assumptions.  Assumptions  used  to  determine 
(penghasilan)  pensiun  neto  mencakup  tingkat  pensions cost (benefits) covered discount rate. 
diskonto. Perubahan asumsi ini akan mempengaruhi  The  changes  of  assumptions  might  affect 
jumlah tercatat imbalan pasca kerja.  carrying value of post-employment benefits. 
   
Grup  menentukan  tingkat  diskonto  yang  sesuai  The  Group  determines  the  appropriate 
pada  akhir  pelaporan,  dengan  mempertimbangkan  discount  rate  at  the  final  reporting,  by 
tingkat  suku  bunga  obligasi  pemerintah  yang  considering  the  discount  rate  of  government’s 
didenominasi  dalam  mata  uang  imbalan  yang  akan  bond  which  denominated  in  benefit’s  currency 
dibayar  dan  memiliki  jangka  waktu  yang  serupa  that  will  be  paid  and  have  a  similar  term  with 
dengan jangka waktu liabilitas yang terkait.  the terms of the related liabilities. 
   
Pajak Penghasilan Final  Final Income Tax 
   
Pajak  penghasilan  dari  aktivitas  jasa  konstruksi  Income  tax  from  construction  is  computed 
dihitung  berdasarkan  Peraturan  Pemerintah  (PP)  based  on  the  Government  Regulation  No.  40 
No.  40  tahun  2009  mengenai  perubahan  atas  PP  year  2009  concerning  amendments  of 

58
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
No.  51  tahun  2008  tentang  pajak  penghasilan  atas  Government  Regulation  No.  51  year  2008 
penghasilan dari usaha jasa konstruksi yang berlaku  concerning  income  tax  from  the  construction 
efektif  mulai  tanggal  1  Agustus  2008,  dimana  business  that  is  effective  starting  1  August 
perlakuan  pengenaan  pajak  final  dikenakan  atas  2008,  where  the  final  tax  at  3%  is  applied  for 
kontrak  sebesar  3%  yang  diperoleh  mulai  tanggal  contract signed starting August 1, 2008. 
1 Agustus 2008. 
   
Pajak penghasilan final disajikan diluar beban pajak  Final  income  tax  is  presented  outside  of  
penghasilan pada laba rugi.  the income tax expenses in profit or loss. 
   
Perbedaan  nilai  tercatat  aset  atau  liabilitas  yang  The  difference  between  the  final  income  tax 
berhubungan  dengan  pajak  penghasilan  final  carrying  amounts  of  existing  assets  and 
dengan  dasar  pengenaan  pajaknya  tidak  diakui  liabilities,  and  their  respective  final  tax  bases 
sebagai aset atau liabilitas pajak tangguhan.  are  not  recognised  as  deferred  tax  assets  or 
liabilities. 
   
Penurunan Nilai atas Goodwill  Impairment of Goodwill 
   
Uji  penurunan  nilai  goodwill  wajib  dilakukan  Impairment testing of goodwill is required to be 
sedikitnya  setahun  sekali  tanpa  memperhatikan  performed  at  least  annually  irrespective  of 
apakah  telah  terjadi  indikasi  penurunan  nilai.   whether  or  not  there  are  indications  of 
Penentuan  nilai  pakai  aset  tak  berwujud  impairment.  Determining  the  value  in  use  of 
membutuhkan  estimasi  arus  kas  yang  diharapkan  intangible  assets  requires  the  estimation  of 
akan  dihasilkan  dari  pemakaian  berkelanjutan  dan  cash  flows  expected  to  be  generated  from     
pelepasan  akhir  atas  aset  tersebut  serta  tingkat  the  continued  use  and  ultimate  disposition  of 
diskonto yang tepat untuk menghitung nilai kini.  such  assets  and  a  suitable  discount  rate  in 
order to calculate the present value. 
   
Manajemen  berkeyakinan  bahwa  asumsi-asumsi  While it is believed that the assumptions used 
yang  digunakan  dalam  estimasi  nilai  pakai  dalam  in the estimation of the value in use of assets 
laporan  keuangan  konsolidasian  adalah  tepat  dan  reflected  in  the  consolidated  financial 
wajar, namun demikian, perubahan signifikan dalam  statements  are  appropriate  and  reasonable, 
asumsi-asumsi tersebut dapat berdampak signifikan  significant  changes  in  this  assumptions  may 
pada  jumlah  nilai  terpulihkan  dan  jumlah  kerugian  materially  affect  the  assessment  of 
penurunan  nilai  yang  terjadi  mungkin  berdampak  recoverable  values  and  any  resulting 
material pada hasil operasi Grup.  impairment loss could have a material adverse 
impact on the results of Group’s operations. 
   
Penilaian Instrumen Keuangan  Valuation of Financial Instruments 
   
Seperti  dijelaskan  dalam  Catatan  56,  Grup  As  described  in  Note  56,  the  Group  uses 
menggunakan  teknik  penilaian  yang  meliputi  input  valuation  techniques  that  include  inputs  that 
yang  tidak  didasarkan  pada  data  pasar  yang  dapat  are  not  based  on  observable  market  data  to 
diobservasi  untuk  mengestimasi  nilai  wajar  dari  estimate  the  fair  value  of  certain  types  of 
beberapa jenis instrumen keuangan.  financial instruments. 
   
Direksi  berpendapat  bahwa  teknik  penilaian  yang  The directors believe that the chosen valuation 
dipilih  dan  asumsi  yang  digunakan  adalah  tepat  techniques  and  assumptions  used  are 
dalam  menentukan  nilai  wajar  dari  instrumen  appropriate  in  determining  the  fair  value  of 
keuangan.  financial instruments. 
   
Arus Kas Masa Depan dari Perjanjian Jasa Konsesi  Future  Cash  Flows  from  Service  Concession 
Arrangement 
   
WSE menilai aset keuangannya dari proyek konsesi  WSE  assesses  its  financial  asset  from 
pada  setiap  tanggal  pelaporan.  Manajemen  concession  project  at  each  reporting  date. 
membuat  penilaian  mengenai  metodologi  dan  Management  makes  judgment  as  to                
asumsi  untuk  memperkirakan  jumlah  dan  waktu  the  methodology  and  assumptions  for 
arus  kas  masa  depan  dari  pembayaran  kapasitas.  estimating  the  amount  and  timing  of  future 
Nilai  tercatat  aset  keuangan  dari  proyek  konsesi  cash flows of capacity payments. The carrying 
diungkapkan pada Catatan 20.  amount  of  financial  asset  from  concession 
project is disclosed in Note 20. 
 

59
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
3. KAS DAN SETARA KAS    3. CASH AND CASH EQUIVALENTS 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Kas/ Cash on Hand 2.781.880.609  2.690.836.858 
Bank/ Cash in Banks
Pihak Berelasi/ Related Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Rakyat Indonesia (Persero) Tbk 1.580.163.710.049  3.577.277.028.470 
PT Bank Negara Indonesia (Persero) Tbk 453.093.673.820  550.950.460.346 
PT Bank Mandiri (Persero) Tbk 141.346.910.647  822.314.481.793 
PT Bank Tabungan Negara (Persero) Tbk 17.568.587.521  358.026.853.237 
PT Bank Syariah Mandiri 7.719.397.707  20.121.642.345 
PT Bank BRIsyariah Tbk 6.579.540.449  13.935.029.576 
Indonesia Eximbank  217.125.880  12.498.435.480 
PT Bank BNI Syariah 212.542.805  1.378.278.107 
Dolar Amerika Serikat/ United States Dollar
PT Bank Negara Indonesia (Persero) Tbk 9.195.605.646  98.717.661.322 
PT Bank Mandiri (Persero) Tbk 3.596.463.008  228.988.212.069 
PT Bank Rakyat Indonesia (Persero) Tbk 1.005.498.033  902.389.453 
Yen Jepang/ Japanese Yen
PT Bank Negara Indonesia (Persero) Tbk 7.756.143.191  7.741.972.406 
Euro
PT Bank Mandiri (Persero) Tbk 56.601.860  9.235.372 
Sub Jumlah/ Sub Total 2.228.511.800.616 5.692.861.679.976
Pihak Ketiga/ Third Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Bukopin Tbk 42.622.592.515  462.452.546.281 
PT Bank DBS Indonesia 28.141.100.636  109.254.884.725 
PT Bank Central Asia Tbk 16.125.437.926  98.604.496.404 
PT Bank Mestika Dharma Tbk 8.367.862.644  30.021.254.768 
PT Bank UOB Indonesia 8.150.093.857  15.230.102.540 
PT Bank CIMB Niaga Tbk 4.957.912.989  54.224.434 
PT Bank OCBC NISP Tbk 4.673.231.590  5.149.528.068 
Bank of Tokyo Mitsubishi UFJ, Ltd. 4.395.468.289  3.404.351.826 
PT Bank BNP Paribas Indonesia 3.384.299.421  125.552.896 
PT Bank CIMB Niaga Tbk - Unit Usaha/ B usiness Unit  Syariah 3.126.338.061  3.114.737.194 
PT Bank Permata Tbk 2.706.434.379  14.474.682.739 
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk  2.701.637.966  19.455.917.821 
PT Bank Pan Indonesia Tbk 2.112.372.818  63.566.300.741 
PT Bank Sumitomo Mitsui Indonesia  2.034.849.102  919.454.796 
PT Bank Maybank Indonesia Tbk 1.955.710.886  1.512.880.496 
Bank Mizuho 1.801.857.848  1.730.054.037 
PT Bank CTBC Indonesia 1.745.440.862  5.000.905.945 
PT Bank of China 1.678.728.522  30.949.986.488 
PT Bank Pembangunan Daerah Banten 1.614.164.435  14.322.102.544 
PT Bank Danamon Tbk 1.526.327.334  16.186.984.681 
PT Bank Mega Tbk 1.391.508.674  514.002.758 
PT Bank DKI 1.319.831.926  3.276.431.256 
PT Bank HSBC Indonesia 533.990.608  1.268.600.607 
PT Bank Pembangunan Daerah Papua 516.734.049  7.112.265.845 
PT Bank BCA Syariah  289.594.035  15.163.714.399 
Industrial and Commercial Bank of China 261.764.313  3.301.107.451 
PT Bank Pembangunan Daerah Riau 10.750.326  5.131.241 
PT Bank Pembangunan Daerah Kalimantan Timur dan Kalimantan Utara 3.974.250  3.632.774 
Riyal Arab Saudi/ Saudi Arabian Riyal
The National Commercial Bank - Jeddah 2.990.946  1.391.735.823 
Ringgit Malaysia/ Malaysian Ringgit
PT Bank Maybank Indonesia Tbk 12.328.017  232.173.987 
Sub Jumlah/ Sub Total 148.165.329.224 927.799.745.565
Deposito Berjangka/ Time Deposit
Pihak Berelasi/ Related Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Negara Indonesia (Persero) Tbk 538.090.045.953  2.082.320.954.802 
PT Bank Tabungan Negara (Persero) Tbk 66.505.000.000  108.505.000.000 
PT Bank Rakyat Indonesia (Persero) Tbk 30.000.000.000  977.000.000.000 
PT Bank Mandiri (Persero) Tbk 10.000.000.000  110.000.000.000 
Sub Jumlah/ Sub Total 644.595.045.953 3.277.825.954.802

60
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Ketiga/ Third Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk  315.000.000.000  317.500.000.000 
PT Bank BTPN Tbk (d/h/ formerly  PT Bank Tabungan Pensiunan Nasional Tbk) 142.000.000.000  300.000.000.000 
PT Bank Bukopin Tbk 10.000.000.000  70.000.000.000 
PT Bank Maybank Indonesia Tbk 5.000.000.000  -- 
PT Bank CIMB Niaga Tbk --  200.000.000.000 
PT Bank CTBC --  57.000.000.000 
Sub Jumlah/ Sub Total 472.000.000.000 944.500.000.000
Jumlah/ Total 3.496.054.056.402 10.845.678.217.201
Tingkat Suku Bunga Deposito Berjangka per Tahun (%)/
Interest Rate of Time Deposits per Annum (%) 5,10% - 5,80% 3,30% - 9,50%
Jangka Waktu/ Time Period 1 - 3 Bulan/ Months 1 - 3 Bulan/ Months

4. INVESTASI JANGKA PENDEK    4. SHORT-TERM INVESTMENTS 


 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Deposito yang Dibatasi Penggunaannya Restricted of Time Deposits
PT Bank Mandiri (Persero) Tbk 8.448.200.000  8.448.200.000  PT Bank Mandiri (Persero) Tbk
Jumlah 8.448.200.000 8.448.200.000 Total

 
Deposito berjangka yang jatuh tempo tiga bulan sampai    Time deposits due three months until one year and 
dengan setahun dan sertifikat deposito berjangka yang  certificates of time deposits is used as collateral for 
dijadikan  jaminan  atas  pinjaman  bank  yaitu  sebagai  bank  loans  deposits  that  is  restricted  in  use  
deposito yang dibatasi penggunaannya (Catatan 22).  (Note 22). 
     
5. PIUTANG USAHA – BERSIH    5. ACCOUNTS RECEIVABLE – NET 
 
Lancar   Current

30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi Related Parties
Piutang Usaha Jasa Konstruksi 5.681.777.090.319  1.853.135.078.019  Construction Service Receivables
Dikurangi: Cadangan Kerugian Penurunan   Less: Allowance for Impairment Losses of 
Nilai Piutang Usaha Jasa Konstruksi (138.051.248.129) (134.008.269.018) Construction Service Receivables
Piutang Dagang 678.968.182.710  522.930.768.360  Trade Receivables
Sub Jumlah 6.222.694.024.900 2.242.057.577.361 Sub Total
Pihak Ketiga Third Parties
Piutang Usaha Jasa Konstruksi 709.269.559.369  826.854.126.965  Construction Service Receivables
Dikurangi: Cadangan Kerugian Penurunan   Less: Allowance for Impairment Losses of 
Nilai Piutang Usaha Jasa Konstruksi (488.748.873.871) (502.932.659.704) Construction Service Receivables
Piutang Dagang 1.442.741.242.253  1.201.387.169.461  Trade Receivables
Piutang Sewa 695.923.299  822.475.571  Rent Receivables
Sub Jumlah 1.663.957.851.050 1.526.131.112.293 Sub Total
Jumlah 7.886.651.875.950 3.768.188.689.654 Total

61
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Rincian  saldo  piutang  usaha  jasa  konstruksi  tanpa    The  details  of  construction  service  receivables 
cadangan  kerugian  penurunan  nilai  adalah  sebagai  without  allowance  for  impairment  lossess  are  as 
berikut:  follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
PT Jasamarga Semarang Batang 2.498.905.895.960  108.375.622.730 
PT Cinere Serpong Jaya 1.135.760.850.551  -- 
PT Transjawa Paspro Jalan Tol 800.651.763.334  122.388.873.896 
PT Jasamarga Solo Ngawi 496.148.787.598  1.282.370.352.146 
PT Hutama Karya (Persero) 462.090.588.221  -- 
PT Kertas Leces (Persero) 86.707.725.121  86.707.725.121 
PT Jasamarga Ngawi Kertosono Kediri 58.182.044.638  -- 
KSO/JO  WKR - RNI 27.226.574.264  41.166.848.158 
PT Dok dan Perkapalan Kodja Bahari (Persero) 26.260.305.600  26.260.305.600 
PT Istaka Karya (Persero) 22.527.353.440  22.527.353.440 
PT Hotel Indonesia Natour (Persero) 19.512.768.204  27.307.686.385 
PT Angkasa Pura I (Persero) 5.242.691.802  78.318.343.800 
PT Prima Multi Terminal --  24.991.151.231 
Lain-lain/ Others  (di bawah/ below  Rp 20 Milyar/ Billion ) 42.559.741.586  32.720.815.512 
Sub Jumlah/ Sub Total 5.681.777.090.319 1.853.135.078.019
Pihak Ketiga/ Third Parties
PT Broadbiz Asia 106.596.781.459  106.596.781.459 
PT Trikarya Graha Utama 100.650.939.502  100.650.939.502 
PT Bangun Investa Graha 93.137.768.963  93.137.768.963 
PT Royal Abadi Dentalindo 88.020.000.434  84.106.000.434 
PT Ade Pede Realty 53.953.367.794  53.953.367.794 
Pemerintah Daerah/ District Governments 53.710.681.966  136.945.828.517 
Bin Ladin Contractor Group LLC 53.000.910.399  53.000.910.399 
PT Kukuh Mandiri Lestari 39.198.261.049  -- 
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 27.243.155.833  31.871.330.197 
Kementerian Perhubungan/ The Ministry of Transportation --  22.807.670.736 
Lain-lain/ Others  (di bawah/ below  Rp 20 Milyar/ Billion ) 93.757.691.970  143.783.528.964 
Sub Jumlah/ Sub Total 709.269.559.369 826.854.126.965
Jumlah/ Total 6.391.046.649.688 2.679.989.204.984
 
Mutasi  cadangan  kerugian  penurunan  nilai  piutang    The  movements  of  allowance  for  impairment 
usaha jasa konstruksi adalah sebagai berikut:  losses  of  construction  service  receivables  are  as 
  follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Saldo Awal (636.940.928.722) (485.576.340.874) Beginning Balance


Penambahan (6.983.479.566) (178.009.521.434) Addition
Pemulihan 13.244.195.498  64.941.669.482  Recovery
Reklasifikasi 3.880.090.790  (38.296.735.896) Reclassification
Saldo Akhir (626.800.122.000) (636.940.928.722) Ending Balance

Nilai  pemulihan  atas  cadangan  kerugian  penurunan  The  value  of  recovery  on allowance  for  impairment 
nilai  piutang  usaha  jasa  konstruksi  pada  tanggal   of  account  receivables  from  construction  services 
30  September  2019  adalah  sebesar   as  of  September  30,  2019  amounted  to  
Rp  13.244.195.498,    terdiri  dari  Pemerintah  Daerah  Rp  13,244,195,498,  consists  of  the  District 
Pekanbaru  sebesar  Rp  6.664.574.997,  PT  Harmas  Governments  of  Pekanbaru  amounted  to  
Jalesveva  sebesar  Rp  3.639.120.046,  dan  PT  Hotel  Rp  6,664,574,997,  PT  Harmas  Jalesveva 
Indonesia  Natour  (Persero)  sebesar   amounted  to  Rp  3,639,120,046,  and  PT  Hotel 
Rp 2.940.500.455.   Indonesia  Natour  (Persero)  amounted  to  
  Rp 2,940,500,455.  
   
Nilai penambahan atas cadangan kerugian penurunan    The  additional  value  of  allowance  for  impairment 
nilai piutang usaha jasa konstruksi pada pada tanggal  losses  on  construction  services  receivable  
30 September 2019 adalah sebesar Rp 6.983.479.566  as  of  September  30,  2019  amounted  to  
yang berasal dari PT Istaka Karya (Persero).  Rp 6,983,479,566 was came from  PT Istaka Karya 
(Persero). 

62
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Nilai  pemulihan  atas  cadangan  kerugian  penurunan    The value of recovery on allowance for impairment 
nilai  piutang  usaha  jasa  konstruksi  pada  tanggal     of  account  receivables  from  construction  services                 
31  Desember  2018  adalah  sebesar   as  of  December  31,  2018  amounted  to  
Rp 64.941.669.482, terdiri dari PT Jasa Marga Bali Tol  Rp  64,941,669,482,  consists  of    PT  Jasa  Marga 
sebesar  Rp  34.369.107.612,  PT  Halla  Mohana  Bali Tol amounted to Rp 34,369,107,612, PT Halla 
sebesar  Rp  10.741.054.966,  Hotel  Indonesia  Natour  Mohana  amounted  to  Rp  10,741,054,966,  Hotel 
(Persero)  sebesar  Rp  9.922.318.637,  Bin  Ladin  Indonesia  Natour  (Persero)  amounted  to  
Contractor  Group  sebesar  Rp  5.554.598.400,  Rp  9,922,318,637,  Bin  Ladin  Contractor  Group 
Kementerian  PUPR  sebesar  Rp  1.457.214.382,   amounted  to  Rp  5,554,598,400,  the  Ministry  of 
PT  Merdeka  Sandi  Surya  sebesar  Rp  1.000.000.000,  Public  Works  and  Public  Housing  amounted  to  
Lembaga  Administrasi  Negara  sebesar   Rp  1,457,214,382,  PT  Merdeka  Sandi  Surya 
Rp  831.402.185,  PT  Kertas  Leces  (Persero)  sebesar  amounted  to  Rp  1,000,000,000,  the  State 
Rp  508.261.538,  PT  Sijiro  Internasional  sebesar   Administration  Agency  amounted  to  
Rp  307.711.762,  dan  PT  Pancamulti  Niaga  Pratama  Rp  831,402,185,  PT  Kertas  Leces  (Persero) 
sebesar Rp 250.000.000.   amounted  to  Rp  508,261,538,  PT  Sijiro 
Internasional  amounted  to  Rp  307,711,762,  and 
PT  Pancamulti  Niaga  Pratama  amounted  to  
Rp 250,000,000.  
     
Nilai penambahan atas cadangan kerugian penurunan    The  additional  value  of  allowance  for  impairment 
nilai  piutang  usaha  jasa  konstruksi  pada  pada   losses  on  construction  services  receivable  
tanggal  31  Desember  2018  adalah  sebesar   as  of  December  31,  2018  amounted  to  
Rp  178.009.521.434  terdiri  dari  PT  Bangun  Investa  Rp  178,009,521,434  consists  of  PT  Bangun 
Graha  sebesar  Rp  65.196.438.274,  PT  Ade  Pede  Investa  Graha  amounted  to  Rp  65,196,438,274, 
Realty  sebesar  Rp  53.953.367.794,  Pemerintah  PT  Ade  Pede  Realty  amounted  to  
Daerah  sebesar  Rp  33.879.581.094,  Bin  Ladin  Rp 53,953,367,794, District Government amounted 
Contractor  Group  sebesar  Rp  16.709.068.180,   to Rp 33,879,581,094, Bin Ladin Contractor Group 
PT  Pardika Wisthi  Sarana sebesar  Rp  3.601.769.500,  amounted  to  Rp  16,709,068,180,  PT  Pardika 
PT  Batam  Island  Marina  sebesar  Rp  1.840.547.431,   Wisthi  Sarana  amounted  to  Rp  3,601,769,500,  
PT  Trikarya  Graha  Utama sebesar  Rp  1.515.901.660,  PT  Batam  Island  Marina  amounted  to  
Dinas  Pekerjaan  Umum  Provinsi  Riau  sebesar   Rp  1,840,547,431,  PT  Trikarya  Graha  Utama 
Rp  977.545.114,  dan  PT  Metro Wisata  Raya  sebesar  amounted  to  Rp  1,515,901,660,  Public  Works 
Rp 335.302.387.  Office  of  Riau  Province  amounted  to  
Rp  977,545,114,  and  PT  Metro  Wisata  Raya 
amounted to Rp 335,302,387. 
     
Manajemen  telah  membentuk  cadangan  penurunan    The  management  provided  allowance  for 
nilai  piutang  berdasarkan  penilaian  individual  atas  impairment  losses  on  receivable,  based  on 
masing-masing pelanggan.  individual assessment of each customers. 
     
Manajemen berpendapat bahwa cadangan penurunan    The  management  believes  that  allowance  for 
nilai piutang usaha kepada pihak ketiga adalah cukup  impairment  losses  of  trade  accounts  receivable  to 
untuk  menutupi  kerugian  yang  mungkin  timbul  dari  third  parties  are  sufficient  to  cover  the  possible 
tidak  tertagihnya  piutang  tersebut.  Manajemen  juga  losses  on  uncollectible  receivables. 
berpendapat  bahwa  tidak  terdapat  risiko  yang  The  management  also  believes  that  there  is  no 
terkonsentrasi secara signifikan atas piutang usaha.  significant risk concentrated in accounts receivable. 
 
     
Rincian saldo piutang dagang sebagai berikut:  The details of trade receivables are as follows: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
PT Pertamina (Persero) 38.166.077.971  49.588.241.256 
KSO/JO  Waskita - Acset 37.163.120.561  18.911.177.500 
PT Pembangunan Perumahan (Persero) Tbk 35.742.934.239  16.218.742.359 
PT Hutama Karya (Persero) 18.090.537.802  7.509.984.340 
KSO/JO  Waskita - Gorip Nanda Guna 7.924.201.883  67.973.786.370 
Lain-lain/ Others  (dibawah/ below  Rp 20 Milyar/ Billion ) 543.112.489.802  373.019.458.845 
Dikurangi: Cadangan Kerugian Penurunan Nilai Piutang/
Less: Allowance for Impairment Losses of 
Receivables (1.231.179.548) (10.290.622.310)
Sub Jumlah/ Sub Total 678.968.182.710 522.930.768.360

63
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Ketiga/ Third Parties
PT Hakaaston 255.900.279.800  86.038.340.000 
Pelanggan dari Apartment The Reiz Condo 140.907.779.009  176.356.040.529 
PT Mandiri Bangun Makmur 127.148.555.928  -- 
PT Modernland Realty Tbk 83.976.935.398  -- 
KSO/ JO  Pembangunan Perumahan 63.711.079.250  22.465.575.000 
PT Apical KAO Chemical 50.602.096.760  -- 
KSO/ JO Shimizu Pembangunan Perumahan Bangun Cipta Kontraktor 46.019.051.153  -- 
Pemerintah Daerah 36.696.009.613  -- 
PT Kapuk Naga Indah 32.311.883.019  10.608.667.777 
PT Girder Indonesia 29.555.559.140  -- 
PT Hyundai Engineering & Construction CO LTD 27.204.401.830  11.118.136.001 
Lain-lain/ Others  (dibawah/ below  Rp 20 Milyar/ Billion ) 568.849.521.995  914.030.080.647 
Dikurangi: Cadangan Kerugian Penurunan Nilai Piutang/
Less: Allowance for Impairment Losses of Receivables (20.141.910.642) (19.229.670.493)
Sub Jumlah/ Sub Total 1.442.741.242.253 1.201.387.169.461
Jumlah/ Total 2.121.709.424.963 1.724.317.937.821

Jumlah  piutang  usaha  berdasarkan  umur  adalah    The  amount  of  accounts  receivable  based  on  age 
sebagai berikut:  are as follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Sampai dengan 12 Bulan Up to 12 Months
Belum Jatuh Tempo 4.893.318.859.347  2.657.503.706.686  Not Yet Due
Sudah Jatuh Tempo 2.760.697.010.383  1.078.184.737.177  Past Due
> 13 - 24 Bulan - Sudah Jatuh Tempo 237.552.676.649  222.375.747.281  >13 - 24 Months - Past Due
> 25 - 36 Bulan - Sudah Jatuh Tempo 198.381.641.639  126.551.919.049  >25 - 36 Months - Past Due
> 36 Bulan - Sudah Jatuh Tempo 444.874.900.122  350.033.800.986  >36 Months - Past Due
Jumlah 8.534.825.088.140 4.434.649.911.179 Total
 
Piutang  usaha  dijaminkan  pada  bank-bank  pemberi    Accounts  receivables  are  guaranteed  on  bank 
pinjaman (Catatan 22 dan 30), dengan rincian sebagai  lenders (Notes 22 and 30), with details as follows: 
berikut: 
     
  PT Bank Mandiri (Persero) Tbk, piutang usaha yang      PT  Bank  Mandiri  (Persero)  Tbk,  accounts 
dijaminkan  terhadap  proyek  yaitu  tagihan  termin  receivable  which  are  used  as  collateral 
atas, Proyek Jalan Tol Bekasi – Cawang - Kampung  consisting of terms of bill from Bekasi - Cawang 
Melayu  Seksi  2A  sebesar  Rp  891.548.691.000,  -  Kampung  Melayu  Section  2A  Toll  Road 
Pembangunan Jalan Tol Kayu Agung – Palembang  Project amounted to Rp 891,548,691,000, Kayu 
–  Betung  Paket  I  sebesar  Rp  2.058.463.205.040,  Agung  –  Palembang  –  Betung  Toll  Road 
Pembangunan  Jalan  Tol  Terbanggi  Besar  -   Construction  Package  I  project  amounted  to  
Rp  2,058,463,205,040,  Terbanggi  Besar  – 
Pematang  Panggang  –  Kayu  Agung  Seksi  2B  
Pematang  Panggang  –  Kayu  Agung  Toll  Road 
sebesar  Rp  467.333.480.784,  Pembangunan  Tol 
Construction  Section  2B  project  amounted  to 
Pematang  Panggang  –  Kayu  Agung  Seksi  2A  Rp  467,333,480,784,  Pematang  Panggang  – 
sebesar  Rp  957.997.883.690,  Pembangunan  Tol  Kayu Agung Toll Road Construction Section 2A 
Pematang  Panggang  –  Kayu  Agung  Seksi  3  project  amounted  to  Rp  957,997,883,690, 
sebesar  Rp  2.047.455.211.317,  Pembangunan  Tol  Pematang  Panggang  –  Kayu  Agung  Toll  Road 
Pematang  Panggang  –  Kayu  Agung  Seksi  1  Construction  Section  3  project  amounted  to  
sebesar  Rp  622.703.919.382,  dan  Pembangunan  Rp  2,047,455,211,317,  Pematang  Panggang  – 
Tol  Pematang  Panggang  –  Kayu  Agung  Seksi  4A  Kayu  Agung  Toll  Road  Construction  Section  1 
sebesar Rp 570.278.367.209 (Catatan 22.1).  project  amounted  to  Rp  622,703,919,382,  and 
Pematang  Panggang  –  Kayu  Agung  Toll  Road 
Construction  Section  4A  project  amounted  to 
Rp 570,278,367,209 (Note 22.1). 
   
  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk,  piutang      PT  Bank  Rakyat  Indonesia  (Persero)  Tbk, 
usaha  yang  dijaminkan  terhadap  proyek  yaitu  accounts  receivable  which  are  used  as 
tagihan  termin  atas  Proyek  Tol  Medan  Kualanamu  collateral consisting of terms of bill from Medan 
Kualanamu  Tebing  Tinggi  Section  6  Toll  Road 

64
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Tebing Tinggi Seksi 6 sebesar Rp 159.367.339.965,  Project amounted to Rp 159,367,339,965, Solo 
Proyek  Pembangunan  Tol  Solo  –  Ngawi   –  Ngawi  Toll  Road  Project  Package  2  project 
Paket  2  sebesar  Rp 399.753.317.390,  amounted  to  Rp  399,753,317,390,  Teraskita 
Hotel  Makassar  Construction  amounted  to  
Pembangunan  Teraskita  Hotel  Makassar  sebesar 
Rp  88,979,924,526,  Depati  Amir  Airport 
Rp 88.979.924.526, Perluasan Bandara Depati Amir  Expansion  amounted  to  Rp  284,614,861,818, 
Rp  284.614.861.818,  Pembangunan  Apartemen  Construction  of  Solterra  Apartments  amounted 
Solterra  sebesar  Rp  487.926.000.000,  to  Rp  487,926,000,000,    Becakayu  Toll  Road 
Pembangunan  Jalan  Tol  Becakayu  Seksi  2A  Ujung  Construction  Section  2A  Ujung  project 
sebesar  Rp  772.934.636.364,  Pekerjaan  Renovasi  amounted  to  Rp  772,934,636,364,  Istiqlal 
Masjid  Istiqlal  sebesar  Rp  423.000.907.273,  dan  Mosque  Renovation  Project  amounted  to  
Rp 423,000,907,273, and Construction of Ciawi 
Pembangunan Tol Ciawi Sukabumi Seksi 4 sebesar  Sukabumi  Section  4  Toll  Road  amounted  to  
Rp 1.724.233.413.036 (Catatan 22.3).  Rp 1,724,233,413,036 (Note 22.3). 
     
  PT  Bank  BNP  Paribas  Indonesia,  piutang  usaha      PT  Bank  BNP  Paribas  Indonesia,  accounts 
yang  dijaminkan  yaitu  tagihan  termin  atas  proyek  receivable  which  are  used  as  collateral 
Pembangunan  Bendungan  Rukoh  Kabupaten  Pidie  consisting  of  terms  of  bill  from  the  Rukoh  Dam 
Development  Pidie  2  District  (MYC)  amounted 
2  (MYC)  sebesar  Rp  1.129.147.661.000  (Catatan 
to Rp 1,129,147,661,000 (Note 22.16). 
22.16). 
     
  PT  Bank  Pembangunan  Daerah  Jawa  Barat  dan      PT  Bank  Pembangunan  Daerah  Jawa  Barat 
Banten  Tbk,  piutang  yang  dijaminkan  terhadap  dan  Banten  Tbk,  accounts  receivable  used  as 
Proyek  yaitu  tagihan  termin  atas pembangunan  Tol  collateral  consisting  of  terms  of  bill  from 
Terbanggi  Besar  –  Pematang  Panggang  – 
Ruas  Terbanggi  Besar  -  Pematang  Panggang  - 
Kayu  Agung  section  2  Toll  Road  project 
Kayu Agung Seksi 2 sebesar Rp 1.866.223.553.000   amounted  to  Rp 1,866,223,553,000  and 
dan  Jalan  Tol  Semarang  –  Batang  sebesar   Semarang  -  Batang  Toll  Road  Project 
Rp 937.500.000.000 (Catatan 22.9).  amounted to Rp 937,500,000,000 (Note 22.9). 
     

  Indonesia  Eximbank,  piutang  usaha  yang      Indonesia Eximbank, accounts receivable which 


dijaminkan  yaitu  tagihan  termin  atas  proyek  are  used  as  collateral  consisting  of  terms  
Pekerjaan  Pembangunan  Jalan  Tol  Pembangunan  of  bill  from  Pasuruan  Probolinggo  Toll  Road 
Project  amounted  to  Rp  3,217,979,000,000 
Jalan  Tol  Pasuruan  Probolinggo  sebesar 
(Note 22.5). 
Rp 3.217.979.000.000 (Catatan 22.5). 
     
  PT  Bank  Pan  Indonesia  Tbk,  piutang  usaha      PT  Bank  Pan  Indonesia  Tbk,  accounts 
 yang  dijaminkan  terhadap  proyek  yaitu  tagihan  receivable  which  are  used  as  collateral  are 
termin  atas  proyek  Jalan  Tol  Kayu  Agung  –  terms  of  bill  from  Kayu  Agung  –  Palembang  - 
Betung Toll Road Project Package IV Section 3 
Palembang  –  Betung  Paket  IV  Seksi  3  sebesar  
amounted  to  Rp 1,153,324,437,038  and  
Rp  1.153.324.437.038  dan  Pembangunan   The  Development  of  Ciawi  –  Sukabumi  
Jalan  Tol  Ciawi  –  Sukabumi  Seksi  3  sebesar   Toll  Road  Section  3  amounted  to  
Rp 1.818.281.700.000 (Catatan 22.8).  Rp 1,818,281,700,000 (Note 22.8). 
     
  PT  Bank  UOB  Indonesia,  piutang  usaha      PT  Bank  UOB  Indonesia,  accounts  receivable 
yang  dijaminkan  terhadap  proyek  yaitu   which  are  used  as  collateral  are  terms  of  
tagihan  termin  atas  Proyek  Pembangunan  bill  from  the  Constructions  of  Bener  
Dam  Kabupaten  Purworejo  package  2  
Bendungan  Bener  Kabupaten  Purworejo  Paket  2 
Project  amounted  to  Rp  627,658,824,000, 
sebesar  Rp  627.658.824.000,  Pengembangan  Development  of  Hasanuddin  Airport  
Bandara  Hasanuddin  Makassar  sebesar   Makasar  amounted  to  Rp  464,200,000,000,  
Rp  464.200.000.000,  Pembangunan  Rest  Area  the  Constructions  of  Rest  Area  at  Bakauheni 
Jalan Tol Ruas Bakauheni Terbanggi Besar Paket II  Terbanggi  Besar  Package  II  Toll  Road  Project 
sebesar  Rp  356.651.651.559,  dan  Revitalisasi  amounted  to  Rp  356,651,651,559,  and  
Kawasan  Pusat  Pelatihan  Olahraga  Pelajar  the  Revitalization  of  the  Ragunan  Student 
Sports  Training  Center  Area  amounted  to  
Ragunan  sebesar  Rp  419.422.177.700  (Catatan  Rp 419,422,177,700 (Note 22.13). 
22.13). 
     
  PT  Bank  Negara  Indonesia  (Persero)  Tbk,  piutang      PT  Bank  Negara  Indonesia  (Persero)  Tbk,          
usaha  yang  dijaminkan  terhadap  proyek  yaitu  accounts  receivable  which  are  used  as 
tagihan termin atas proyek Pembangunan Jalan Tol   collateral are terms of bill from the constructions 
of  Cibitung  –  Cilincing  Toll  Road  Project 
Cibitung – Cilincing sebesar Rp 3.036.516.090.599, 
amounted  to  Rp  3,036,516,090,599, 
Proyek Pembangunan Bendungan Way Sekampung  Bendungan  Way  Sekampung  (Package  2)  Toll 

65
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
(Paket  2)  sebesar  Rp  368.827.235.863,   Road Project amounted to Rp 368,827,235,863, 
Proyek  Pembangunan  Bendungan  Leuwikeris  Leuwikeris  Dam  (Package  2)  Development 
(Paket  2)  sebesar  Rp  291.578.218.364,  Proyek  Project  amounted  to  Rp  291,578,218,364, 
Connection  of  Bekasi  –  Cawang  –  Kampung 
Pembangunan Koneksi Jalan Tol Bekasi – Cawang 
Melayu  Toll  Road  with  Wiyoto  Wiyono  Toll 
–  Kampung  Melayu  dengan  Tol  Wiyoto  Wiyono  Road Project amounted to Rp 309,045,385,376, 
sebesar  Rp 309.045.385.376, SPAM Aceh sebesar   SPAM Aceh amounted to Rp 895,507,975,000, 
Rp  895.507.975.000,  Bendungan  Jlantah  sebesar   Jlantah Dam amounted to Rp 599,773,156,627, 
Rp 599.773.156.627, Light Rail Transit di Sumatera  Light Rail Transit at South Sumatera amounted 
Selatan sebesar Rp 4.129.318.842.470, dan Proyek  to Rp 4,129,318,842,470, and Terbanggi Besar 
Jalan Tol Terbanggi Besar Kayu Agung VGF Japek  Kayu  Agung  VGF  Japek  Toll  Road  Project 
amounted  to  Rp  1,957,959,411,818  (Note  22.2 
sebesar  Rp  1.957.959.411.818  (Catatan  22.2  dan  and 30). 
30). 
     
  Bank  of  Tokyo  Mitsubishi  UFJ,  Ltd  piutang  usaha      Bank  of  Tokyo  Mitsubishi  UFJ,  Ltd.  accounts 
yang  dijaminkan  terhadap  proyek  yaitu  tagihan  receivable  which  are  used  as  collateral      
termin  atas  Proyek  Pembangunan  PLTA  Wado  are terms of bill from PLTA Wado Development 
sebesar Rp 788.405.200.000 (Catatan 22.19).  project  amounted  to  Rp  788,405,200,000  
(Note 22.19). 
     
  PT  Bank  Maybank  Indonesia  Tbk,  piutang  usaha      PT  Bank  Maybank  Indonesia  Tbk,  accounts 
yang  dijaminkan  terhadap  Proyek  Jalan  Tol  Kayu  receivable  which  are  used  as  collateral  are 
Agung  -  Palembang  -  Betung  Paket  II  Seksi  II  terms  of  bill  from  Kayu  Agung  –  Palembang  - 
sebesar Rp 1.384.243.938.679 (Catatan 22.12).  Betung  Toll  Road  Project  Package  II  Section 2 
  amounted  to  Rp  1,384,243,938,679  (Note 
22.12). 
     
  PT Bank BTPN Tbk piutang usaha yang dijaminkan      PT Bank BTPN Tbk, accounts receivable which 
terhadap  proyek  yaitu  tagihan  termin  atas  Proyek  are  used  as  collateral  are  terms  of  bill  from 
Tol Ruas Pematang Panggang - Kayu Agung Seksi  Pematang  Panggang  -  Kayu  Agung  Toll  
4 sebesar Rp 1.508.871.128.489 (Catatan 22.11).  Road  Project  Section  4  amounted  to 
Rp 1,508,871,128,489 (Note 22.11). 
     
  PT  Bank  Syariah  Mandiri,  piutang  usaha  yang      PT  Bank  Syariah  Mandiri,  accounts  receivable 
dijaminkan  terhadap  proyek  yaitu  tagihan  termin  which  are  used  as  collateral  are  terms  of                  
atas proyek Pembangunan Jalan Tol JORR II Ruas  bill from the constructions of JORR II Toll Road 
Kunciran-Serpong  sebesar  Rp  1.647.434.473.517  segment  Kunciran  -  Serpong project  amounted 
dan  Proyek  Pembangunan  Jalan  Tol  Ruas   to Rp 1,647,434,473,517 and the Constructions 
Krian  -  Legundi  -  Bunder  -  Manyar  sebesar   of  Krian  -  Legundi  Bunder-Manyar  Segment  
Rp 2.497.748.956.351 (Catatan 22.4).  Toll  Road  project  amounted  to  
             
Rp 2,497,748,956,351 (Note 22.4). 
 
  PT  Bank  DKI,  piutang  usaha  yang  dijaminkan      PT  Bank  DKI,  accounts  receivable  which  are 
terhadap  proyek  yaitu  tagihan  termin  atas  proyek  used  as  collateral  are  terms  of  bill  from 
Pembangunan (Design and Build) Akses Pelabuhan  Development and Design Project Access Kuala 
Kuala  Tanjung  Ruas  Inderapura  –  Kuala  Tanjung  Tanjung  Port  section  Inderapura  -  Kuala 
sebesar Rp 1.541.509.360.000 (Catatan 22.10).  Tanjung  amounted  to  Rp  1,541,509,360,000 
(Note 22.10). 
     
  PT  Bank  CIMB  Niaga  Tbk  –  Unit  Usaha  Syariah,      PT  Bank  CIMB  Niaga  Tbk  –  Syariah  Business 
piutang  usaha  yang  dijaminkan    terhadap  proyek  Unit,  accounts  receivable  which  are  used  as 
yaitu  tagihan  termin  atas  Proyek  Pembangunan  collateral  are  terms  of  bill  from  Kayu  Agung  – 
Jalan Tol  Kayu Agung – Palembang - Kapal Betung  Palembang  –  Kapal  Betung  Toll  Road 
Paket  IV  seksi  3B  sebesar  Rp  558.653.008.937  Construction  Project  Package  IV  Section  3B 
(Catatan 22.20 dan 30).  amounted  to  Rp  558,653,008,937  (Note  22.20 
and 30). 
 

66
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
  PT  Bank  DBS  Indonesia,  piutang  usaha  yang                  
  Bank  of  China  Ltd,  accounts  receivable  which 
dijaminkan  terhadap  proyek  yaitu  tagihan  termin  are  used  as  collateral  are  terms  of  bill  from  
atas  Proyek  Pabrik  Baja  WKI  Cikande  sebesar   the  Constructions  of  WKI  Steel  Factory  at 
Rp  56.707.137.000,  Underpass  MM  2100  Cikarang  Cikande  amounted  to  Rp  56,707,137,000,, 
Barat  sebesar  Rp  111.415.000.000,  GI  Sangatta  –  Underpass MM 2100 Cikarang Barat amounted 
Maloy  Section  1  sebesar  Rp  110.372.620.000,  GI  to  Rp  111,415,000,000,  GI  Sangatta  –  Maloy 
Rengat – Tembilahan sebesar  Rp 97.765.491.325,  Section  1  amounted  to  Rp  110,372,620,000,  
GI  Rengat  –  Tembilahan  amounted  to  
Transmisi 150 Kv GI Sangatta – GI Maloy Section 3 
Rp  97,765,491,325,  Transmisi  150  Kv  GI 
sebesar  Rp  82.404.403.000,  dan  Pembangunan 
Sangatta  –  GI  Maloy  Section  3  amounted  to  
Sub  Gardu  Induk  BSH  dan  Penarikan  Kabel   Rp  82,404,403,000,  and  the  Constructions  of 
Menuju  Power  Gardu  Hubung  BSH  sebesar  Sub-Base  Submission  BSH  and  Cable 
Rp 108.592.562.264 (Catatan 22.14).  Withdrawal  Towards  BSH  Substation  Power 
amounted to Rp 108,592,562,264 (Note 22.14). 
     
  Bank  of  China  Ltd,  piutang  usaha  yang                    Bank  of  China  Ltd,  accounts  receivable  which 
dijaminkan  terhadap  proyek  yaitu  tagihan  termin  are used as collateral are terms of bill from Civil 
atas  Proyek  Pembangunan  Bendungan  Works  for  Construction  of  Karian  Multipurpose 
Multipurpose  Karian  sebesar  Rp  124.258.805.332,  Dam Project amounted to Rp 124,258,805,332, 
proyek  pembangunan  Bendungan  Tapin  sebesar   Construction of Tapin Dam project amounted to    
Rp  220.072.178.791,  proyek  Revitalisasi  TPA  Rp  220,072,178,791,  TPA  Sarbagita  Suwung 
Regional  Sarbagita  Suwung  (MYC)  sebesar   Regional  Revitalization  (MYC)  project 
amounted  to  Rp  207,828,197,304,  and 
Rp  207.828.197.304,  dan  proyek  Pekerjaan  
Cisumdawu  Phase  II  Toll  Road  Project 
Jalan  Tol  Cisumdawu  Phase  II  sebesar 
amounted to Rp 173,041,000,000 (Note 22.15). 
Rp 173.041.000.000 (Catatan 22.15). 
   
  Sindikasi PT Bank BTPN Tbk, Bank of China (Hong    Syndication  of  PT  Bank  BTPN  Tbk,  Bank  of 
Kong) Limited  Jakarta  Branch,  PT  Bank  KEB  Hana  China  (Hong  Kong)  Limited  Jakarta  Branch,  
Indonesia, PT Bank Permata Tbk., PT Bank OCBC  PT  Bank  KEB  Hana  Indonesia,  PT  Bank 
NISP  Tbk.,  PT  Bank  China  Construction  Bank  Permata  Tbk.,  PT  Bank  OCBC  NISP  Tbk.,  
Indonesia  Tbk.,  PT  Bank  CTBC  Indonesia,   PT  Bank  China  Construction  Bank  Indonesia 
PT  Bank  Shinhan  Indonesia,  PT  Bank  SBI  Tbk.,  PT  Bank  CTBC  Indonesia,  PT  Bank 
Indonesia piutang yang dijaminkan terhadap proyek  Shinhan  Indonesia,  PT  Bank  SBI  Indonesia  
the  project's  guaranteed  receivables  are  
yaitu nilai kontrak konstruksi proyek Jalan Tol Kayu 
the  constuction  contract  of  Kayu  Agung  - 
Agung - Palembang - Betung II Seksi 2 & 3, proyek 
Palembang  -  Betung  II  Toll  Road  project 
Bandara  Achmad  Yani  Semarang,  proyek  Section 2 & 3, Achmad Yani Semarang Airports 
Bendungan  Temef  NTT,  proyek  Universitas  Negeri  project,  Temef  NTT  Dam  project,  Construction 
Yogyakarta,  Pembangunan  Gedung  Rektorat,  of  the  Rectorate  Building,  Faculty  &  Area 
Gedung  Fakultas  &  Kawasan  3  Pilar  Kampus  Building  3  Campus  Pillars  of  the  Islam 
Universitas  Islam  Internasional  Indonesia  (UIII)  Internasional  Indonesia  University  (UIII) 
Paket I, dan proyek Bendungan Marga Tiga sebesar  Package  I,  and  Marga  Tiga  Dam  project 
total  Rp  5.250.077.000.000  (Catatan  30.1  Pihak  amounted  to  Rp  5,250,077,000,000  (Note  30.1 
Ketiga).  Third Parties). 
     
  Sindikasi  Transmisi  500  KV  Sumatera  PT  Bank      Transmission  500  KV  Sumatera  Project 
Rakyat  Indonesia  (Persero)  Tbk,  PT  Bank  Central  Finance  Syndication  from  PT  Bank  Rakyat 
Asia  Tbk.,  PT  Sarana  Multi  Infrastruktur  (Persero),  Indonesia (Persero) Tbk, PT Bank Central Asia 
PT  Bank  Maybank  Indonesia  Tbk,  Indonesia  Tbk.,  PT  Sarana  Multi  Infrastruktur  (Persero),  
Eximbank,  piutang  yang  dijaminkan  terhadap  PT  Bank  Maybank  Indonesia  Tbk,  Indonesia 
proyek  yaitu  tagihan  termin  atas  proyek  Eximbank, accounts receivable which are used 
Pembangunan  Proyek  Transmisi  500  KV  Sumatera  as  collateral  consisting  of  terms  of  bill  from  
the  development  of  Sumatera  Transmition  500 
Paket  1  &  2  (New  Aurduri  –  Pranap  –  Prawang) 
KV  Sumatera  Development  projects,  Package 
sebesar Rp 12.052.144.911.454 (Catatan 22.6). 
1&2  (New  Aurduri–Pranap–Prawang)  project 
  amounted  to  Rp  12,052,144,911,454  (Note 
22.6). 
     
  Sindikasi  Pendanaan  Proyek  Tol  Cinere  Serpong      Syndication  of  Cinere  Serpong  Toll  Road 
PT Bank CIMB Niaga Tbk, PT Bank DBS Indonesia,  Project  of  PT  Bank  CIMB  Niaga  Tbk,  PT  Bank 
PT  Bank  KEB  Hana  Indonesia  piutang  yang  DBS  Indonesia,  PT  Bank  KEB  Hana  Indonesia 
dijaminkan  terhadap  proyek  yaitu  tagihan  termin  receivables  which  are  used  as  collateral  for  

67
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
atas  Proyek  Tol  Cinere  Serpong  sebesar   the  project,  namely  term  bills  of  the  Cinere 
Rp 1.875.000.000.000 (Catatan 22.21).  Serpong  Toll  Project  amounted  to  
Rp 1,875,000,000,000 (Note 22.21). 
     
  Sindikasi  Pendanaan  Proyek Tol  Jakarta-Cikampek      Syndication  Funding  of  Jakarta-Cikampek  Toll 
PT Bank Mandiri (Persero) Tbk, The Bank of Tokyo- Road Project of PT Bank Mandiri (Persero) Tbk,  
Mitsubishi  UFJ,  LTd.,  Cabang  Jakarta,  PT  Sarana  The  Bank  of  Tokyo-Mitsubishi  UFJ,  LTd., 
Multi  Infrastruktur  (Persero),  PT  Bank  Central  Asia  Jakarta  Branch,  PT  Sarana  Multi  Infrastruktur 
Tbk,  PT  Bank  BNP  Paribas  Indonesia,  PT  Bank  (Persero), PT Bank Central  Asia Tbk, PT Bank 
CIMB  Niaga  Tbk,  dan  PT  Bank  KEB  Hana  BNP  Paribas  Indonesia,  PT  Bank  CIMB  
Indonesia  obyek  jaminan  fidusia  dengan  nilai  Niaga  Tbk,  and  PT  Bank  KEB  Hana  Indonesia  
the  object  of  a  fiduciary  guarantee  with  
penjaminan  sebesar  Rp  6.022.454.998.873 
a  guarantee  value  amounted  to  
(Catatan 22.7). 
Rp 6,022,454,998,873 (Note 22.7). 
     
  Sindikasi  PT  Bank  BTPN  Tbk,  PT  Bank  Permata      Syndication  of  PT  Bank  BTPN  Tbk,  PT  Bank 
Tbk,  PT  Bank  Shinhan  Indonesia,  dan  PT  Bank  Permata Tbk., PT Bank Shinhan Indonesia, and 
Resona Perdania piutang yang dijaminkan terhadap  PT  Bank  Resona  Perdania  which  are 
proyek  yaitu  nilai  kontrak  konstruksi  pembangunan  guaranteed  for  the  project,  namely  
proyek Jalan Tol Tebing Tinggi– Parapat (Tahap 1)  the  construction  contract  value  of  the  Tebing 
Ruas  Tebing  Tinggi  –  Serbelawan  termasuk  Tinggi  –  Parapat  (Stage  1)  Tebing  Tinggi  – 
Simpang  Susun  Serbelawan  dan  Pembangunan  Serbelawan    include  Simpang  Susun 
Serbelawan,  and  Construction  of  Nines  Plaza  
Proyek  Nines  Plaza  dan  Residence  sebesar  
and  Residence  Project  amounted  to  
Rp 3.092.908.000.000 (Catatan 30.2 Pihak Ketiga). 
Rp  3,092,908,000,000  (Note  30.2  Third 
Parties). 
     
  PT  Bank  BNI  Syariah,  piutang  yang  dijaminkan      PT  Bank  BNI  Syariah,  accounts  receivable 
terhadap  proyek  yaitu  tagihan  termin  atas  proyek  which  are  used  as  collateral  are  terms  of  
Bendungan Komering II/Tiga Dihaji Paket II sebesar  bill  from  Komering  II/Tiga  Dihaji  Package  II 
Rp 767.175.314.280  (Catatan 22.22).  Dam  Project  was  used  as  collateral  bank  
loans  of  PT  Bank  BNI  Syariah    amounted  to  
Rp 767,175,314,280  (Note 22.22). 

6. PIUTANG VENTURA BERSAMA    6. JOINT VENTURES RECEIVABLES 

Kemitraan/ Nama Proyek/ 30 September/ 31 Desember/


Venturer Project Name September 30, 2019 December 31, 2018
Rp Rp
Waskita - Acset Jalan Layang Cikampek  1.922.582.819.871  500.058.753.646 
Waskita - Acset Indonusa Jalan Tol Terbanggi Besar - Kayu Agung (VGF JAPEK) 49.026.366.667  31.485.897.725 
Waskita - Wika Jalan Tol Bocimi 45.009.237.542  -- 
Waskita - Hutama - Wika Runway BDR Samarinda Baru 33.550.685.744  33.876.180.051 
Waskita - PAL PLTU Malinau --  34.436.228.607 
Lain-lain/ Others
(di bawah/ below  Rp 20 Milyar/ Billion ) 29.155.156.749  59.805.366.086 
Jumlah/Total 2.079.324.266.573 659.662.426.115
 
Piutang  ventura  bersama  merupakan  pinjaman  dan    Joint  venture  receivables  represent  loan  and 
biaya  ventura  bersama  yang  dibayarkan  terlebih  dahulu  advance payment  of  joint  venture’s  expenses paid 
oleh Grup.  by the Group. 
     
Piutang  ventura  bersama  tidak  dikenakan  bunga.    Joint  venture  receivables  were  not  subjected  to 
Piutang ini tidak memiliki jaminan dan akan dilunasi pada  interest. These accounts have no collateral and are 
saat diminta.  repayable on demand. 
     
Manajemen  berpendapat  bahwa  piutang  ventura  Management  believes  that  balances  of  joint 
bersama dapat ditagihkan.  venture receivables are collectible. 
 
 
 
 
 

68
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
7. PIUTANG RETENSI – BERSIH    7. RETENTION RECEIVABLES – NET 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Pihak Berelasi 1.185.657.222.223 976.780.232.806 Related Parties


Dikurangi: Cadangan Kerugian Penurunan  Less: Allowance for Impairment Losses of 
Nilai Piutang (21.783.819.042) (21.783.819.041) Receivables
Sub Jumlah 1.163.873.403.181 954.996.413.765 Sub Total
Pihak Ketiga 505.332.811.247 564.717.590.481 Third Parties
Dikurangi: Cadangan Kerugian Penurunan  Less: Allowance for Impairment Losses of 
Nilai Piutang (169.127.770.630) (185.846.919.096) Receivables
Sub Jumlah 336.205.040.617 378.870.671.385 Sub Total
Jumlah 1.500.078.443.798 1.333.867.085.150 Total
 
Rincian saldo piutang retensi adalah sebagai berikut:    The details of retention receivables are as follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
PT Jasamarga Solo Ngawi 320.037.209.429  296.040.870.372 
PT Pejagan Pemalang Tol Road 185.886.927.455  167.017.230.721 
PT Transjawa Paspro Jalan Tol 157.170.764.021  111.731.435.646 
PT Hutama Karya (Persero) 128.555.666.689  61.210.836.152 
PT Jasamarga Ngawi Kertosono Kediri 78.557.749.673  75.000.513.058 
PT Cinere Serpong Jaya 59.776.886.871  -- 
PT Angkasa Pura I (Persero) 55.234.369.025  271.609.200 
PT Prima Multi Terminal 48.152.664.562  48.152.664.562 
PT Perusahaan Listrik Negara (Persero) 29.249.431.711  29.466.418.607 
KSO/JV  Waskita Karya - Triniti 26.189.516.546  26.189.516.546 
PT PAL Indonesia (Persero) 23.835.098.479  23.835.098.479 
PT Pelabuhan Indonesia II (Persero) 2.421.248.890  33.208.263.892 
PT Kereta Api Indonesia  --  37.558.238.570 
Lain-lain/ Others  (di bawah/ below  Rp 20 Milyar/ Billion ) 70.589.688.872  67.097.537.001 
Sub Jumlah/ Sub Total 1.185.657.222.223 976.780.232.806
Pihak Ketiga/ Third Parties
Kementerian Transportasi dan Komunikasi Republik 
Demokrasi Timor Leste/ Ministry of Transport and Communication
 of the Democratic Republic of Timor Leste 89.291.878.064  91.225.884.453 
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
Ministry of Public Works and Housing 62.511.469.370  48.062.779.052 
Kementerian Pekerjaan Umum Republik 
Demokrasi Timor Leste/ Ministry of Public Works
 of the Democratic Republic of Timor Leste 56.424.625.446  54.801.571.157 
Pemerintah Daerah/ District Governments 29.763.808.017  63.024.829.636 
Bin Ladin Contractor Group LLC 29.577.446.348  29.577.446.348 
PT Toba Pengembang Sejahtera 28.076.717.899  28.076.717.899 
PT Pardika Wisthi Sarana 23.431.420.350  23.431.420.350 
Lain-lain/ Others  (di bawah/ below  Rp 20 Milyar/ Billion) 186.255.445.752  226.516.941.586 
Sub Jumlah/ Sub Total 505.332.811.247 564.717.590.481
Jumlah/ Total 1.690.990.033.470 1.541.497.823.287
 
Mutasi  cadangan  kerugian  penurunan  nilai  piutang    The movements of allowance for impairment losses 
retensi adalah sebagai berikut:  of retention receivables are as follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Saldo Awal (207.630.738.137) (130.013.128.440) Beginning Balance


Penambahan --  (57.990.994.384) Addition
Pemulihan 14.096.800.872  10.756.559.394  Recovery
Reklasifikasi 2.622.347.593  (30.383.174.707) Reclassification
Saldo Akhir (190.911.589.672) (207.630.738.137) Ending Balance

69
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Manajemen  telah  membentuk  cadangan  kerugian    The  management  has  provided  an  allowance  for 
penurunan  nilai  piutang,  berdasarkan  penilaian  secara  impairment  losses  of  receivables,  based  on 
individual atas masing-masing pemberi kerja.  individual assessment of each owner of the project. 
     
Manajemen  berpendapat  bahwa  cadangan  kerugian    The  management  believes  that  allowance  for 
penurunan  nilai  piutang  adalah  cukup  untuk  menutupi  impairment  losses  of  receivables  is  sufficient  to 
kemungkinan  tidak  tertagihnya  piutang  retensi  di  cover  the  possible  losses  on  the  uncollectible 
kemudian  hari.  Manajemen  juga  berpendapat  bahwa  retention  receivables  in  the  future.  
tidak  terdapat  risiko  yang  terkonsentrasi  secara  The  management  also  believes  that  there  is  no 
signifikan atas piutang retensi.  significant  risk  concentrated  in  retention 
receivables. 
     
Nilai pemulihan atas cadangan kerugian penurunan nilai    The value of recovery on allowance for impairment 
piutang  retensi  pada  tanggal  30  September  2019   of  retention  receivables  as  September  30,  2019 
adalah  sebesar  Rp  14.096.800.872  yang  terdiri   amounted  to  Rp  14,096,800,872  consist  of  District 
dari  Pemerintah  Daerah  Pekanbaru  sebesar   Government  of  Pekanbaru  amounted  to  
Rp  6.934.898.908,  PT  Harmas  Jalesveva  sebesar   Rp  6,934,898,908,  PT  Harmas  Jalesveva 
Rp  6.843.350.000  dan  Dinas  Pekerjaan  Umum  Provinsi  amounted  to  Rp  6,843,350,000  and  Public  Works 
Riau  sebesar  Rp  318.551.963.  Tidak  ada  penambahan  Office  of  Riau  Province  amounted  to  
atas  cadangan  kerugian penurunan  nilai  piutang  retensi  Rp  318,551,964.  There  is  no  additional  allowance 
pada tanggal 30 September 2019.  for  impairment  of  retention  receivables  as  of 
  September 30, 2019. 
   
Nilai pemulihan atas cadangan kerugian penurunan nilai    The value of recovery on allowance for impairment 
piutang  retensi  pada  tanggal  31  Desember   of  retention  receivables  as  of  December  31,  2018 
2018  adalah  sebesar  Rp  10.756.559.394,  terdiri   amounted  to  Rp  10,756,559,394  consists  of  
dari  PT  Rekayasa  Industri  (Persero)  sebesar   PT  Rekayasa  Industri  (Persero)  amounted  to  
Rp  6.598.822.510,  Pemerintah  Daerah  sebesar   Rp 6,598,822,510, District Governments amounted 
Rp  2.150.079.999,  Kementerian  Hukum  dan  Hak  Asasi  to  Rp  2,150,079,999,  the  Minister  of  Law  and 
Manusia  sebesar  Rp  1.839.320.018,  dan  Kementerian  Human Rights amounted to Rp 1,839,320,018 and  
PUPR sebesar Rp 168.336.867.   the  Ministry  of  Public  Works  and  Public  Housing 
  amounted to Rp 168,336,867.  
     
Nilai  penambahan  atas  cadangan  kerugian  penurunan  The  additional  value  of  allowance  for  impairment 
nilai  piutang  retensi  pada  tanggal  31  Desember   losses on retention receivable as of December 31, 
2018  adalah  sebesar  Rp  57.990.994.384  terdiri  dari  2018  amounted  to  Rp  57,990,994,384  consists  
Pemerintah  Daerah  sebesar  Rp  9.944.426.180,   of  District  Governments  amounted  to  
PT  Graha  Sarana  Duta  sebesar  Rp  8.341.433.021,   Rp  9,944,426,180,  PT  Graha  Sarana  Duta 
PT  Mega  Pasanggrahan  Indah  sebesar   amounted  to  Rp  8,341,433,021,  PT  Mega 
Rp  7.112.585.516,  Bin  Ladin  Contractor  Group  sebesar  Pasanggrahan  Indah  amounted  to                     
Rp  6.336.292.257,  PT  Pembangunan  Jaya  Ancol  Rp  7,112,585,516,  Bin  Ladin  Contractor  Group 
sebesar  Rp  6.186.460.112,  PT  Sentul  City  Tbk  sebesar  amounted to Rp 6,336,292,257, PT Pembangunan 
Rp  5.000.000.000,  PT  Pardika  Wisthi  Sarana  sebesar  Jaya  Ancol  amounted  to  Rp  6,186,460,112,                     
Rp 4.285.104.000, PT Adhi Karya (Persero) Tbk sebesar  PT Sentul City Tbk amounted to Rp 5,000,000,000, 
Rp  3.617.875.301,  PT  Trikarya  Graha  Utama  sebesar  PT  Pardika  Wisthi  Sarana  amounted  to               
Rp  3.529.310.280,  PT  Gapura  Kencana  Abadi  sebesar  Rp  4,285,104,000,  PT  Adhi  Karya  (Persero)  Tbk 
Rp  1.000.000.000,  PT  Angkasa  Pura  II  sebesar   amounted to Rp 3,617,875,301, PT Trikarya Graha 
Rp  709.863.819,  PT  Pandan  Harum  Medika  sebesar   Utama amounted to Rp 3,529,310,280, PT Gapura 
Rp 681.818.182, Rumah Sakit Advent Bandung sebesar  Kencana  Abadi  amounted  to  Rp  1,000,000,000,  
Rp  422.694.545,  PT  Pertamedika  Sentul  sebesar   PT Angkasa Pura II amounted to  Rp 709,863,819, 
Rp  313.636.362,  PT  Angkasa  Pura  I  sebesar   PT  Pandan  Harum  Medika  amounted  to                     
Rp  271.609.200,  PT  Menara  Pelangi  sebesar                  Rp  681,818,182,  Advent  Bandung  Hospital 
Rp  137.885.609  dan  PT  Jambi  Permai  Abadi  sebesar   amounted  to  Rp  422,694,545,  PT  Pertamedika 
Rp 100.000.000.   Sentul  amounted  to  Rp  313,636,362,  PT  Angkasa 
Pura  I  amounted  Rp  271,609,200,  PT  Menara 
Pelangi  amounted  to  Rp  137,885,609  and  
PT  Jambi  Permai  Abadi  amounted  to             
Rp 100,000,000.  
     
 
 
 
 
 

70
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
8. PIUTANG LAIN-LAIN – BERSIH    8. OTHER RECEIVABLES – NET 
     
a. Piutang Lain-lain Lancar – Bersih   a. Other Current Receivable – Net
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
PT Waskita Transjawa Toll Road 2.968.339.868.706  2.390.959.282.226 
PT Hutama Karya (Persero) 710.617.069.524  659.975.854.163 
PT Jasamarga Ngawi Kertosono Kediri 278.105.708.320  270.330.068.992 
KSO/JO  WKR - Darmo Permai 210.842.235.783  136.766.227.637 
PT Perusahaan Listrik Negara (Persero) 178.220.547.045  54.832.072.389 
PT Cinere Serpong Jaya 129.782.078  67.197.871.133 
Lain-lain/ Others  (dibawah/ below Rp  20 Milyar/ Billion ) 295.706.678.020  60.400.357.825 
Dikurangi: Cadangan Kerugian Penurunan Nilai Piutang/
Less: Allowance for Impairment Losses of  Receivables (9.076.656.786) (9.076.656.786)
Sub Jumlah/ Sub Total 4.632.885.232.690 3.631.385.077.579
Pihak Ketiga/ Third Parties
Lembaga Manajemen Aset Negara 6.083.788.511.920  5.136.839.607.632 
Lain-lain/ Others  (dibawah/ below Rp  20 Milyar/ Billion ) 461.078.798  1.875.317.672 
Dikurangi: Cadangan Kerugian Penurunan Nilai Piutang/
Less: Allowance for Impairment Losses of  Receivables (2.633.405.290) (2.150.894.080)
Sub Jumlah/ Sub Total 6.081.616.185.428 5.136.564.031.224
Jumlah/ Total 10.714.501.418.118 8.767.949.108.803
 
Piutang  lain-lain  terutama  merupakan  biaya  yang    Other  receivables  mainly  consist  of  
dibayar  terlebih  dahulu  oleh  Grup  untuk  keperluan  bank  guarantee  fee  which  has  been  paid  in 
penerbitan  bank  garansi  atas  Kredit  Modal  Kerja  advance  by  the  Group  for  the  Working  Capital 
(KMK)  untuk  subkontraktor.  Piutang  ini  akan  dilunasi  Loan  (WCL)  to  the  subcontractors.  These 
pada saat diminta.  receivables are repayable on demand. 
     
Piutang  kepada  PT  Waskita  Transjawa  Toll  Road    Other  receivables  from  PT  Waskita  Transjawa 
merupakan  modal  kerja  pinjaman  kepada  entitas  Toll Road is working capital loans to associates, 
asosiasi  sebagaimana  tertuang  dalam  Perjanjian  as  set  forth  in  the  Loan  Facility  Agreement  
Pinjaman  Fasilitas  Pemegang  Saham   No.  05/FPPS/WTR/2018  dated  November  7, 
No.  05/FPPS/WTR/2018  tanggal  7  November  2018  2018  between  WTR  and  PT  Waskita  Transjawa 
antara  WTR  dan  PT  Waskita  Transjawa  Toll  Road,  Toll  Road,  which  will  mature  on  October  30, 
yang  akan  jatuh  tempo  pada  30  Oktober  2019.  2019.  The  loans  were  used  for  the  purpose  of 
Pinjaman  tersebut  digunakan  untuk  kebutuhan  investment  and  operation  and  had  an  interest 
investasi  dan  operasional  dan  memiliki  bunga  rate of 13.5% per annum. 
pinjaman sebesar 13,5% per tahun. 
     
Piutang  kepada  PT  Hutama  Karya  (Persero)  Other  receivables  from  PT  Hutama  Karya 
digunakan  untuk  memberikan  dana  talangan  tanah  (Persero)  were  used  to  provide  land  bailouts  for              
ruas  Jalan  Tol  Ruas  Terbanggi  Besar  –  Pematang  the  Terbanggi  Besar  -  Pematang  Panggang  - 
Panggang  –  Kayuagung  sesuai  dengan  Perjanjian  Kayuagung Toll Road section in accordance with 
Fasilitas  Pinjaman  No.  DU/TAW.1614/S.Perj.29/2017  the Loan Facility Agreement No. DU/TAW.1614/ 
tanggal 19 Juni 2017.  S.Perj.29/2017 dated June 19, 2017. 
   
Piutang  kepada  PT  Jasamarga  Ngawi  Kertosono    Other  receivables  from  PT  Jasamarga  
Kediri  digunakan  untuk  keperluan  operasional,  Ngawi  Kertosono  Kediri  were  used  for  
sebagaimana  tertuang  dalam  Perjanjian  Pinjaman  operational  purpose,  as  set  forth  in  
Fasilitas  Pemegang  Saham  Amandemen  II   the  Amendment  II  of  Loan  Facility  Agreement  
No.  26/ADD/FPPS/WTR/2018  tanggal  10  Desember  No.  26/ADD/FPPS/WTR/2018  dated  December 
2018  antara  WTR  dan  PT  Jasamarga  Ngawi  10,  2018  between  WTR  and  PT Jasamarga 
Kertosono  Kediri,  yang  akan  jatuh  tempo  pada   Ngawi  Kertosono  Kediri,  which  will  mature  on 
10  Desember  2019.  Pinjaman  tersebut  memiliki  December  10,  2019.  The  loan  had  an  interest 
bunga pinjaman sebesar 12% per tahun.  rate of 12% per annum. 
   
Piutang  kepada  KSO  WKR-Darmo  dengan  WKR  Other  receivables  of  KSO  WKR-Darmo  with                 
terbagi  menjadi  dua  jenis  obyek,  pertama  perjanjian  WKR divided into two objectives, first loan facility 
pinjaman  Kerja  Sama  Operasi  (KSO)                       
agreement  joint  operation  (“KSO”)  
No.  003/P.WKR/2017  dan  kegiatan  modal  kerja.  No.  003/P.WKR/2017  and  working  capital. 
Piutang  No.  003/P.WKR/2017  ini  dijaminkan  dengan   This receivable No. 003/P.WKR/2017 is secured 
piutang  usaha  milik  KSO  Waskita  Darmo.  Perjanjian  by  KSO  Waskita  Darmo  trade  receivable.  
ini  akan  berakhir  bersamaan  dengan  Perjanjian             This  agreement  will  end  at  the  same  time  of  

71
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
WKR  dengan  PT  Bank  Tabungan  Negara  (Persero)  the  Loan  Agreement  between  WKR  and  
Tbk.  PT Bank Tabungan Negara (Persero) Tbk. 
     
Piutang  kepada  PT  Cinere  Serpong  Jaya  digunakan    Other receivables from PT Cinere Serpong Jaya 
untuk  keperluan  dana  talangan  tanah,  sebagaimana  were  used  for  the  purpose  of  the  land  bailout 
tertuang  dalam  Perjanjian  Pinjaman  Fasilitas  funds, as set forth in the Loan Facility Agreement 
Pemegang  Saham  No.  08/PKS/WTR/2016  tanggal  No.  08/PKS/WTR/2016  dated  November  28, 
28 November  2016  antara  Grup  dan  PT  Cinere  2016  between  the  Group  and  PT Cinere 
Serpong  Jaya,  yang  akan  jatuh  tempo  pada  Serpong  Jaya,  which  will  mature  on  November 
28 November  2017.  Pinjaman  tersebut  memiliki  28, 2017. The loan had an interest rate  of  9.5% 
bunga  pinjaman  sebesar  9,5%  per  tahun.  Pada  per  annum.  On  June  21,  2017,  Amendment  I 
tanggal  21  Juni  2017,  dibuatkan  Amandemen  I  atas  was  made  on  the  agreement  by  changing  
perjanjian  tersebut  dengan  mengubah  bunga  the  loan  interest  rate  to  13.5%  and  the  maturity 
pinjaman  menjadi  13,5%  dan  jangka  waktu  menjadi  date  to  December  31,  2017.  On  November  30, 
31 Desember 2017. Pada tanggal 30 Nopember 2017  2017,  Amendment  II  was  made  by  changing  
dibuatkan  Amandemen  II  atas  perjanjian  tersebut  the  maturity  date  to  June  29,  2018.  As  of  
dengan  merubah  jangka  waktu  peminjaman  menjadi  the date of reporting, there is no extension of the 
29  Juni  2018.  Sampai  dengan  tanggal  pelaporan  agreement  in  accordance  with  the  Minutes  of 
tidak dilakukan perpanjangan perjanjian sesuai Berita  Termination  of  the  Loan  Facility  Shareholders 
Acara  Pengakhiran  Perjanjian  Fasilitas  Pinjaman  Agreement  No.  106/BA/WTR/DIR/  2018  dated 
Pemegang  Saham  No.  106/BA/WTR/DIR/2018  December  14,  2018.  The  balance  above  is  
tanggal  14  Desember  2018.  Saldo  tersebut  di  atas  the interest of the loan from the land bailout fund 
merupakan  bunga  pinjaman  atas  dana  Talangan  that must be paid by PT Cinere Serpong Jaya up 
Tanah  yang  harus  dibayarkan  oleh  PT  Cinere  to  June  30,  2019.  The  loan  has  been  paid  in 
Serpong  Jaya  maksimal  tanggal  30  Juni  2019.  accordance  with  Addendum  Minutes  of 
Pinjaman  sudah  dilunasi  sesuai  dengan   Termination  of  the  Shareholders  Loan  Facility 
Addendum  Berita  Acara  Pengakhiran  Perjanjian  Agreement  No.  ADD/04.1/WTR/0819  dated 
Fasilitas  Pinjaman  Pemegang  Saham   August 23, 2019 
No. ADD/04.1/WTR/0819 tanggal 23 Agustus 2019 
     
Piutang  lain-lain  kepada  Lembaga  Manajemen  Aset    Other  receivables  to  Lembaga  Manajemen  Aset 
Negara merupakan:  Negara represent: 
     
1. Piutang  atas  Dana  Dukungan    Pemerintah     1.  Receivables  for  Government  Support  Fund 
berdasarkan  Amandemen  V  Perjanjian  based  on  Amendment  V  Concession 
Pengusahaan  Jalan  Tol  Ruas  Jalan  Cimanggis  –  Agreement  Cimanggis  Cibitung  Toll  Road 
Cibitung  sesuai  akta  notaris  No.  11  tanggal   according  to  notarial  deed  No.  11  dated 
21  Desember 2018  dibuat  dihadapan  Notaris  Rina  December  21,  2018  by  Rina  Utami  Djauhari, 
Utami  Djauhari,  S.H.,  dengan  jumlah  dana  S.H., with the total amount of land funds to be 
pengadaan  tanah  yang  harus  disediakan  adalah  provided maximum is Rp 5,281,759,035,495. 
maksimum sebesar Rp 5.281.759.035.495. 
     
2. Piutang  atas  Dana  Dukungan  Pemerintah    2.  Receivables  of  Government  Support  Fund 
berdasarkan  Amandemen  VI  Perjanjian  based  on  Amandment  VI  Concession 
Pengusahaan  Jalan  Tol  Ruas  Jalan  Cibitung  –  Agreement  Cibitung-Cilincing  Toll  Road 
Cilincing sesuai akta notaris No. 17 tanggal 31 Mei  according  to  the  notarial  deed  No.  17  dated 
2018  dibuat  dihadapan  Notaris  Rina  Utami  May 31, 2018 of  notary Rina Utami Djauhari, 
Djauhari,  S.H.,  dengan  jumlah  dana  pengadaan  S.H., with the total amount of land funds to be 
tanah  yang  harus  disediakan  adalah  maksimum  provided maximum is Rp 4,028,212,083,253. 
sebesar Rp 4.028.212.083.253. 
     
3. Piutang  atas  Dana  Dukungan  Pemerintah    3.  Receivables  of  Government  Support  Fund 
berdasarkan  Amandemen  I  Perjanjian  based  on  Amandment  I  Concession 
Pengusahaan Jalan Tol Ruas Jalan Krian-Legundi- Agreement  Krian-Legundi-Bunder-Manyar 
Bunder-Manyar  sesuai  akta  notaris  No.03  tanggal  Toll  Road  according  to  the  notarial  deed 
15  Desember 2017  dibuat  dihadapan  Notaris  Rina  No.  3  dated  December  15,  2017  of  notary 
Utami  Djauhari,  S.H.,  dengan  jumlah  dana  Rina  Utami  Djauhari,  S.H.,  with  the  total 
pengadaan  tanah  yang  harus  disediakan  adalah  amount  of  land  funds  to  be  provided 
maksimum sebesar Rp 1.700.000.000.000.  maximum is Rp 1,700,000,000,000. 
     
4. Piutang  atas  dana  dukungan  Pemerintah    4.  Receivables  of  Government  support  fund 
berdasarkan  Perjanjian  Pengusahaan  Jalan  Tol  based  on  Concession  Agreement  Bekasi  – 
Ruas  Jalan  Bekasi  -Cawang  –  Kampung  Melayu  Cawang  –  Kampung  Melayu  Toll  Road 
sesuai  akta  notaris  No.  09  tanggal    16  Desember  according  to  the  notarial  deed  No.  09  dated 
2011  dibuat  dihadapan  Notaris  Rina  Utami  December  16,  2011  of  notary  Rina  Utami 
Djauhari, S.H..  Djauhari, S.H.. 

72
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
5. Piutang  atas  Dana  Dukungan  Pemerintah    5.  Receivables  of  Government  Support  Fund 
berdasarkan  perjanjian  Pengusahaan  Jalan    Tol  based  on  Concession  Agreement  Krian-
Ruas Jalan Pemalang – Batang sesuai akta notaris  Legundi-Bunder-Manyar  Toll  Road  according 
No.  6  tanggal  31  Agustus  2018  dibuat  dihadapan   to  the  notarial  deed  No.  6  dated  August  31, 
Notaris  Rina  Utami  Djauhari,  S.H.,  dengan  jumlah  2018  of  notary  Rina  Utami  Djauhari,  S.H., 
dana  pengadaan  tanah  yang  harus  disediakan  with  the  total  amount  of  land  funds  to  be 
adalah maksimum sebesar Rp 1.400.000.000.000.  provided maximum is Rp 1,400,000,000,000. 
     
6. Piutang  atas  Dana  Dukungan  Pemerintah    6.  Receivables  of  Government  Support  Fund 
berdasarkan  Amandemen  V  Perjanjian  based  on  Amandment  V  Concession 
Pengusahaan  Jalan    Tol  Ruas  Jalan  Ciawi  –  Agreement  Ciawi  -  Sukabumi  Toll  Road 
Sukabumi  sesuai  akta  notaris  No.  18  tanggal   according  to  the  notarial  deed  No.  18  dated 
31 Mei 2018 dibuat dihadapan  Notaris Rina Utami  May 31, 2018 of  notary Rina Utami Djauhari, 
Djauhari, S.H..  S.H.. 
     
b. Piutang Lain-lain Tidak Lancar   b. Others Non-Current Receivable
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
PT Istaka Karya (Persero) 74.914.307.748  74.914.307.748 
PT Pejagan Pemalang Toll Road 38.681.366.117  36.492.465.249 
Dikurangi: Penyisihan Kerugian Penurunan Nilai Piutang/
Less: Allowance for Impairment Losses of Receivables (74.914.307.748) (74.914.307.748)
Sub Jumlah/ Sub Total 38.681.366.117 36.492.465.249
Pihak Ketiga/ Third Parties
PT Bakrie Toll Indonesia 69.697.329.695  69.697.329.695 
PT Bakrie Toll Road 1.050.000.000  1.050.000.000 
Dikurangi: Penyisihan Kerugian Penurunan Nilai Piutang/
Less: Allowance for Impairment Losses of  Receivables (30.383.893.165) (30.383.893.165)
Sub Jumlah/ Sub Total 40.363.436.530 40.363.436.530
Jumlah/ Total 79.044.802.647 76.855.901.779
 
Piutang  lain-lain  PT  Istaka  Karya  (Persero)  sebesar    Other  receivables  from  PT  Istaka  Karya 
Rp  64.169.976.914  merupakan  piutang  Perusahaan  (Persero) amounted to  Rp 64,169,976,914 were 
yang  diberikan  berdasarkan  keputusan  para  receivables  given  in  accordance  with              
Pemegang  Saham  Perusahaan  di  luar  RUPS  the  Shareholders  of  the  Company  decision 
No. KEP-83/MBU/2011  dan  No.  KEP- outside  of  the  Annual  General  Meeting  of 
PS04/PPA/0411  tanggal  1  April  2011.  Pada  tanggal  shareholders  No.  KEP-83/MBU/2011  and  
21  Mei  2011,  Perusahaan  menerima  Surat  No.  KEP-PS04/PPA/0411  dated  April  1,  2011. 
Pengakuan  Utang  No. L.05B/P/WK/2011  dan  On  May  21,  2011,  the  Company  received  a 
No. DU-SP/2011.01B dari  PT Istaka Karya (Persero)  Letter  of  Debt  Acknowledgement 
sebesar Rp 64.169.976.914.  No. L.05B/P/WK/2011 and No. DU-SP/2011.01B 
from  PT  Istaka  Karya  (Persero)  amounted  to 
Rp 64,169,976,914. 
     
Pada  tanggal  12  April  2011,  PT  Istaka  Karya    On  April  12,  2011,  PT  Istaka  Karya  (Persero) 
(Persero) memohon kepada Perusahaan sesuai surat  requested  to  the  Company  through  letter  
No. DK/2011-323  untuk  menerbitkan  garansi  bank  No.  DK/2011-323  to  issue  a bank guarantee  for 
proyek  Bandar  Lampung  by  Pass  sebesar   Bandar  Lampung  By  Pass  project  amounted  to  
Rp 10.661.885.000 dan biaya provisi untuk penerbitan  Rp 10,661,885,000 and the cost  of provision for 
garansi  bank  sebesar  Rp  312.445.834.   bank  guarantee  issuance  amounted  to  
Pada  tanggal  30  Maret  2012,  bank  garansi  Rp 312,445,834.  On  March 30, 2012  the  bank 
No.   2011/JPU/GB/068/6148/Monday  telah  dicairkan  guarantee  No.  2011/JPU/GB/068/6148/Monday 
oleh  pemilik  proyek,  sehingga  piutang  Perusahaan  has  been  executed  by  the  owner  of  the  project, 
kepada  PT Istaka  Karya  (Persero)  menjadi  sebesar  so  that  the  receivables  of  the  Company  to  
Rp 75.144.307.748.  Ketidakmampuan  PT  Istaka  PT  Istaka  Karya  (Persero)  amounted  to  
Karya  (Persero)  dalam  memenuhi  pembayaran  Rp  75,144,307,748.  Inability  of  PT  Istaka  Karya 
utangnya  menyebabkan  penyelesaian  utang  (Persero)  in  fulfilling  its  debt  payments,  caused 
dilakukan  dengan  cara  Debt  to  Equity  Swap,  yaitu  the settlement of debt using Debt to Equity Swap 
para kreditur  mendapatkan posisi sebagai  pemegang  to  solve  its  debt,  means  the  creditors  get  a 
ekuitas  PT Istaka  Karya  (Persero)  sebagai  pengganti  position  as  an  equity  holder  of  PT Istaka  Karya 
pembayaran  atas  utang  PT  Istaka  Karya  (Persero)  (Persero) in line of payment for a debt PT Istaka 
kepada para kreditur.   Karya (Persero) to the creditors.  

73
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pembayaran piutang akan dilakukan secara bertahap    The  payment  of  receivables  will  be  settled 
ditahun ke 9 sampai maksimal 5 tahun.  partially  at  the  9th  year  for  a  maximum  of  5 
years. 
     
Berdasarkan  surat  dari  Perusahaan  According  to  the  Company’s  letters                 
No. 483/WK/Dir/2013  tanggal  7  Mei  2013  tentang  No.  483/WK/Dir/2013  dated  May  7,  2013         
Pelaksanaan  Putusan  Pengesahan  Perdamaian  that  concerns  The  Execution  of  Decision  
Homologasi) No. 23/PKPU/ 2012/PN.Niaga.JKT.PST.  to  Ratification  of  Peace  (Homologation)  
Perusahaan  meminta  PT  Istaka  Karya  (Persero)  No.  23/PKPU/2012/PN.Niaga.JKT.PST.The 
untuk  menyelesaikan  utangnya  dengan  skema  Company  asked  PT  Istaka  Karya  (Persero)  to 
penyelesaian sebagai berikut:  resolve the debt with this settlement scheme: 
 
1.  Pembayaran  awal  senilai  3%  atau  sebesar    1.  The  initial  payment  valued  at  3%  or  in 
Rp 2.549.586.465.  amounted to Rp 2,549,586,465. 
 
2.  Pemenuhan  sisa  pembayaran  senilai  97%  dari    2.  The  fulfillment  of  the  remaining  payment 
jumlah  utang  dalam  bentuk  penyertaan  saham  valued at 97% from the total debt in the form 
sementara  (Debt  to  Equity  Swap)  sebesar   of  temporary  investments  in  share  of  stocks 
Rp 82.436.629.045.  (Debt to Equity Swap) for Rp 82,436,629,045. 
     
Berdasarkan  surat  di  atas,  Perusahaan  menerima    Based  on  the  letters  above,  the  Company  has 
jawaban  PT Istaka  Karya  (Persero)  dengan  surat  received  the  answer  from  PT  Istaka  Karya 
No. DU/2013-131 tanggal 15 Mei 2013 yang berisi:  (Persero)  with  the  letters  No. DU/2013-131 
dated May 15, 2013 that contains: 
     
1.  Pembayaran  awal  3%  bersumber  dari  pencairan    1.  The  initial  payment  of  3%  from                 
piutang atas eskalasi proyek SKSD.  the  disbursement  of  receivables  of   
  the escalation SKSD project. 
     
2.  Sisa  pembayaran  sebesar  97%  dalam  bentuk    2.  The remaining payment of 97% in the form of 
penyertaan  saham,  sedang  dilakukan  kajian  oleh  investments  in  share  of  stocks,  is  being 
Kementrian Keuangan dan instansi terkait.  reviewed  by  the  Ministry  of  Finance  and 
  related institutions. 
     
Pada  tahun  2017,  terdapat  pemulihan  piutang  In  2017,  there  is  recovery  of  the  allowance  for 
kepada  PT  Istaka  Karya  (Persero)  sebesar         impairment  losses  of  receivable  to  PT  Istaka 
Rp  230.000.000  sejumlah  pembayaran  yang  Karya  (Persero)  amounted  to  Rp  230,000,000. 
dilakukan  oleh  PT  Istaka  Karya  (Persero).  Sampai  Until  reporting  date,  PT  Istaka  Karya  (Persero) 
dengan tanggal pelaporan, PT Istaka Karya (Persero)  has not fulfilled the remaining payment valued at 
belum  memenuhi  sisa  pembayaran  senilai  97%  dari  97% from the total debt in the form of temporary 
jumlah  utang  dalam  bentuk  penyertaan  saham  investments  in  share  of  stock  (Debt  to  Equity 
sementara  (Debt  to  Equity  Swap)  sehingga  Swap) thus the Company provided allowance for 
Perusahaan  membukukan  cadangan  kerugian  impairment  loss  on  receivable  to  PT Istaka 
penurunan piutang kepada PT Istaka Karya (Persero)  Karya (Persero) amounted to Rp 74,914,307,748 
sebesar  Rp 74.914.307.748  atau  sebesar  100%  dari  or 100% from receivable. There is no change in 
nilai  piutang.  Tidak  ada  perubahan  piutang  pada   receivable as of August 31, 2019. 
31 Agustus 2019. 
   
Piutang  lain-lain  PT  Pejagan  Pemalang  Toll  Road    Other  receivables of  PT Pejagan Pemalang  Toll 
digunakan  untuk  operasional  sebagaimana  tertuang  Road were used for the purpose of operation, as 
dalam  Perjanjian  Pinjaman  Fasilitas  Pemegang  set  forth  in  the  Loan  Facility  Agreement  of 
Saham No. 05/FPPS/WTR/2018 tanggal 7 Nopember  Shareholders  No.  05/FPPS/  WTR/2018  dated 
2018,  antara  WTR  dan  PT  Pejagan  Pemalang  Toll  November  7,  2018  with  due  date  October  30, 
Road yang akan jatuh tempo pada 29 Oktober 2019.  2019. The loan had an interest rate of 13.5% per 
Pinjaman  tersebut  memiliki  bunga  pinjaman  sebesar  annum. 
13,5% per tahun.  
   
Piutang  lain-lain  kepada  PT  Bakrie  Toll  Indonesia  Other  accounts  receivable  from  PT  Bakrie  Toll 
dan PT Bakrie Toll Road diberikan sebagai pinjaman  Indonesia  and  PT  Bakrie  Toll  Road  represent 
kepada  pemegang  saham  PT  Cimanggis  Cibitung  loan  to  the  to  the  former  shareholders  of  
Toll  Road  terdahulu  (Sebelum  WTR  mengakuisisi   PT  Cimanggis  Cibitung  Toll  Road  (before  WTR 
PT Cimanggis Cibitung Toll Road).  acquired PT Cimanggis Cibitung Toll Road). 
   

74
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Mutasi  penyisihan  kerugian  penurunan  nilai  piutang  The  movements  of  allowance  for  impairment 
lain-lain adalah sebagai berikut:  losses of other receivables are as follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Saldo Awal  (116.525.751.779) (107.449.094.993) Beginning Balance


Penambahan --  (9.076.656.786) Addition
Reklasifikasi (482.511.210) --  Reclassification
Saldo Akhir (117.008.262.989) (116.525.751.779) Ending Balance
 
Manajemen  berkeyakinan  bahwa  jumlah  cadangan  The  management  believes  that  allowance  for 
kerugian  penurunan  nilai  piutang  cukup  untuk  impairment  losses  on  accounts  receivable  is 
menutupi  kemungkinan  tidak  tertagihnya  piutang  sufficient  to  cover  the  possible  losses  on             
lain-lain di kemudian hari.  the uncollectible other receivables in the future. 
   
Tidak  ada  penambahan  atas  cadangan  kerugian    There  is  no  additional  on  allowance  for 
penurunan  nilai  piutang  lain-lain  pada  tanggal   impairment of other receivables as of September 
30 September 2019.  30, 2019. 
   
Pada tanggal 31 Desember 2018, nilai penambahan  As  of  December  31,  2018,  the  additional  value 
atas cadangan kerugian penurunan nilai piutang lain- of  allowance  for  impairment  losses  on  other 
lain  sebesar  Rp  9.076.656.786  disebabkan  oleh  receivables amounted to Rp 9,076,656,786 was 
penurunan  piutang  lain-lain  atas  PT  Kertas  Leces  due  to  the  decrease  in  other  receivables  from 
(Persero).  PT Kertas Leces (Persero). 
   
9. PERSEDIAAN    9. INVENTORIES 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Bahan Baku Raw Material
Konstruksi 540.305.827.481  820.899.169.547  Construction
Beton Precast 1.369.682.485.669  1.228.429.929.512  Precast Concrete
Sub Jumlah 1.909.988.313.150 2.049.329.099.059 Sub Total

Persediaan dalam Pengembangan Work in Progress
Aset Real Estat 2.383.440.575.002  2.038.845.632.511  Real Estate Assets
Tanah yang Belum Dikembangkan  795.739.844  795.739.844  Undeveloped Land
Sub Jumlah 2.384.236.314.846 2.039.641.372.355 Sub Total

Persediaan untuk Dijual Inventory Available for Sale
Beton Precast 347.376.282.450  999.662.254.602  Precast Concrete
Tanah Kavling Siap Dijual 598.345.228  598.345.228  Lots of Land Ready for Sale
Sub Jumlah 347.974.627.678 1.000.260.599.830 Sub Total
Jumlah 4.642.199.255.674 5.089.231.071.244 Total
 
Bahan baku konstruksi merupakan persediaan material  Raw construction material represents construction 
dan  perlengkapan  proyek  yang  masih  tersedia  di  materials  and  equipment  supply  projects  that  are 
gudang  proyek  yang  dimiliki  oleh  Grup.  Persediaan  still  available  at  the  warehouse  of  existing project 
material  terdiri  dari  persediaan  besi,  semen,  solar,  owned by the Group. The raw material consists of 
tiang  pancang,  keramik/  marmer,  traveler  form,  iron, cement, diesel, pile, ceramic/ marble, traveler 
geotextile, aspal, dan batu.  form, geotextile, asphalt, and stone. 
 
Beton  precast  merupakan  persediaan  produk  beton  The  precast  concrete  represents  the  inventory  of 
unit usaha precast yang  terdiri  dari persediaan barang  concrete  products  of  precast  business  units 
jadi produk beton, persediaan bahan baku,  dan bahan  consisting of concrete finished good, raw materials 
penolong serta persediaan bahan dalam proses.  and  supporting  materials,  including  materials  in         
the process. 
   
Persediaan  aset  real  estat  merupakan  bangunan  The  inventory  of  real  estate  assets  represents 
apartemen  yang  siap  dijual,  tanah  yang  sedang  apartment  units  ready  for  sale,  land  under 
dikembangkan dan bangunan yang sedang dikontruksi.  development and buildings under constructions. 
   
Persediaan tanah kavling merupakan persediaan tanah  The Inventory of lots of land represent land owned 
Perusahaan  di  Perumahan  Bukit  Diponegoro  by  the  Company  in  Bukit  Diponegoro  Housing 
(Semarang)  yang  memiliki  luas  tanah  sebesar  2.469  (Semarang),  which has  a  land  area  of  2,469  sqm 

75
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
m2  dengan  status  kepemilikan  tanah  sertifikat  Hak  with a certificate of land ownership status Right to 
Guna Bangunan (HGB), dengan masa berlaku sampai  Use  (HGB),  valid  until  year  2030.  The  entire 
dengan  tahun  2030.  Seluruh  kepemilikan  atas  tanah  ownership  of  the  land  is  under  the  name  of  
tersebut atas nama Perusahaan.  the Company. 
   
Manajemen  tidak  membentuk  cadangan  penurunan  The  management  did  not  provide  allowance  
nilai  persediaan,  sebab  Manajemen  berkeyakinan  for  impairment  losses  of  inventory  for  
bahwa persediaan dapat digunakan dan dijual.  the  management  believes  that  all  inventories  are 
fully usable and are able to sell. 

10. TAGIHAN BRUTO KEPADA PENGGUNA JASA    10. GROSS AMOUNT DUE FROM CUSTOMERS 
   
Tagihan Bruto kepada Pengguna Jasa – Lancar Gross Amount Due From Customers - Current
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi 25.737.248.718.299  25.029.465.405.951  Related Parties
Dikurangi: Cadangan Kerugian Less: Allowance for Impairment
Penurunan Nilai Piutang (92.180.175.725) (92.180.175.725) Losses of Receivables
Sub Jumlah 25.645.068.542.574 24.937.285.230.226 Sub Total

Pihak Ketiga 4.662.666.891.807  7.694.745.218.248  Third Parties


Dikurangi: Cadangan Kerugian Less: Allowance for Impairment
Penurunan Nilai Piutang (305.361.225.998) (281.297.285.372) Losses of Receivables
Sub Jumlah 4.357.305.665.809 7.413.447.932.876 Sub Total
Jumlah 30.002.374.208.383 32.350.733.163.102 Total
 
Rincian  saldo  tagihan  bruto  kepada  pengguna  jasa  –    The details of gross amount due from customers – 
bagian lancar adalah sebagai berikut:  current portion are as follows: 
 

30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi - Lancar/
Related Parties - Current Portion
PT Hutama Karya (Persero)        13.205.532.704.136  13.307.336.684.806 
PT Perusahaan Listrik Negara (Persero)          5.907.736.252.382  4.335.022.338.588 
PT Jasa Marga Jalan Layang Cikampek          4.928.962.929.219  2.908.863.506.310 
PT Cinere Serpong Jaya             698.273.526.533  -- 
PT Angkasa Pura II (Persero)             264.976.502.744  245.834.186.585 
PT Hutama Marga Waskita             244.280.014.174  -- 
PT Trans Jawa Paspro Jalan Tol             107.237.903.443  817.399.354.874 
PT Prima Multi Terminal               91.200.280.349  46.271.433.648 
PT Jasamarga Solo Ngawi               70.287.855.496  516.335.351.659 
PT Jasamarga Semarang Batang               65.899.304.619  1.917.028.248.076 
PT Angkasa Pura I (Persero)               44.947.654.480  132.807.897.720 
PT PAL Indonesia (Persero) 37.796.106.830  -- 
PT Kereta Api Indonesia (Persero)               28.588.303.372  75.291.840.944 
KSO/JO  RNI Waskita                 2.896.503.803  51.745.450.620 
PT Pejagan Pemalang Toll Road --  353.629.304.351 
PT Pelabuhan Indonesia II (Persero) --  127.298.348.995 
PT Jasamarga Ngawi Kertosono Kediri --  71.144.732.296 
Lain-lain/ Others  (di bawah/ below  Rp 50 Milyar/ Billion )               38.632.876.719  123.456.726.479 
Sub Jumlah/ Sub Total 25.737.248.718.299 25.029.465.405.951
Pihak Ketiga - Lancar/
Third Parties - Current Portion
Kementerian Perhubungan/The Ministry of Transportation 2.281.448.195.922  4.417.482.026.289 
PT Marga Trans Nusantara 1.511.353.993.007  1.281.554.253.626 
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 341.252.631.994  119.503.966.879 
Pemerintah Daerah/ District Governments             110.679.211.659  84.972.965.233 
KSO Hutama-Marga-Waskita               87.617.736.239  -- 
Kementerian Transportasi dan Komunikasi Republik Demokrasi Timor Leste/
The Ministry of Transport and Communication of the Republic Democratic of Timor Leste               48.766.353.290  49.822.602.088 
Kementerian Pekerjaan Umum Republik Demokrasi Timor Leste/
The Ministry of Public Work of the Republic Democratic of Timor Leste               38.155.960.243  64.936.235.997 
Telkom Property (PT Graha Sarana Duta)                 1.884.169.840  48.624.186.380 
PT Cinere Serpong Jaya --  1.425.042.674.256 
Lain-lain/ Others  (di bawah/ below  Rp 50 Milyar/ Billion )             241.508.639.612  202.806.307.500 
Sub Jumlah/ Sub Total 4.662.666.891.807 7.694.745.218.248
Jumlah/ Total 30.399.915.610.106 32.724.210.624.199
 

76
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Informasi  penting  lainnya  yang  berkaitan  dengan    Other important informations regarding to gross 
tagihan  bruto  kepada  pengguna  jasa  sampai  dengan  amount  due  from  customers  as  of  September 
30 September 2019 adalah sebagai berikut:  30, 2019 are as follows: 
     
1. PT Hutama Karya (Persero) – Proyek Pematang   1. PT Hutama Karya (Persero) – Pematang
Panggang – Kayu Agung Panggang – Kayu Agung Project
     
Perusahaan  memperoleh  kontrak  pekerjaan  untuk    The  Company  entered  into  a  construction 
pembangunan  Jalan  Tol  Pematang  Panggang  –  contract  for  the  development  of           
Kayu  Agung  sebesar  Rp  871.834.216.271  untuk  Pematang  Panggang  –  Kayu  Agung  Toll 
Seksi  1,  sebesar  Rp  3.414.684.013.728  untuk  Road  amounted  to  Rp 871,834,216,271  for 
Seksi 2, sebesar Rp 726.528.513.559 untuk Seksi  Section  1,  amounted  to 
3,  dan  Rp  581.222.810.847  untuk  Seksi  4  Rp 3,414,684,013,728  for  Section  2, 
No. GMJT/YDA.1793/DIV.225/2016  pada  tanggal  amounted  to  Rp 726,528,513,559  for 
25 Juli 2016.  Section  3,  and  amounted  to 
Rp 581,222,810,847  for  Section  4, 
No. GMJT/YDA.1793/DIV.225/2016  dated 
July 25, 2016. 
 
2. PT Hutama Karya (Persero) – Proyek   2. PT Hutama Karya (Persero) –
Pembangunan Jalan Tol Terbanggi Besar – The Development of Terbanggi Besar –
Kayu Agung Kayu Agung Toll Road Project
     
Perusahaan mengadakan kontrak pekerjaan untuk    The  Company  entered  into  a  construction 
pembangunan  Jalan  Tol  Terbanggi  Besar  –  Kayu  contract  for  the  development  of  Terbanggi 
Agung  No.  DU/PPH.3291/S.Perj.58/2018  pada  Besar  –  Kayu  Agung  Toll  Road  Project 
tanggal  31 Desember  2018  dengan  nilai  kontrak  No. DU/PPH.3291/S.perj.58/2018  dated 
sebesar Rp 3.637.733.007.746.  December  31,  2018  with  a  contract 
amounted to Rp 3,637,733,007,746. 
 
3. PT Perusahaan Listrik Negara (Persero) (PLN) –   3. PT Perusahaan Listrik Negara (Persero)
Proyek Transmisi Sumatera 500 KVA (PLN) - Sumatera Transmition 500 KVA
Project
 
Perusahaan  mengadakan  kontrak  pekerjaan        The  Company  entered  into  a  construction 
untuk Pembangunan Transmisi Sumatera 500 kVA  contract  on  Sumatera  Transmition  500  kVA 
seksi 1  Proyek  No.  0532.PJ/DAN.02.02/              section  1  Project  No. 0532.PJ/DAN.02.02/ 
DIR/2015  dan  seksi  2  Proyek  No.  0533.PJ/  DIR/2015  and  section  2  Project 
DAN.02.02/DIR/2015  tanggal  23 Oktober  2015  No. 0533.PJ/DAN.02.02/DIR/2015  dated 
dengan  nilai  kontrak  masing-masing  sebesar  October  23,  2015  with  a  contract  
Rp 3.532.414.000.000 dan Rp 2.573.501.000.000.  amounted  to  Rp 3,532,414,000,000  and 
Rp 2,573,501,000,000, respectively.               
 
4. PT Jasamarga Jalan Layang Cikampek –   4. PT Jasamarga Jalan Layang Cikampek –
Proyek Jalan Tol Jakarta Cikampek II Elevated Jakarta Cikampek II Elevated Toll Road
Project
     
Perusahaan  mengadakan  kontrak  pekerjaan         The  Company  entered  into  a  construction 
untuk pembangunan Jalan Tol Jakarta – Cikampek  contract  on  Jakarta  –  Cikampek  II  Elevated 
II  Elevated  dengan  nomor  kontrak   Toll  Road  Project  with  contract  number             
001/KONTRAK-DIR/JJC/II/2017,  pada  tanggal   001/KONTRA–DIR/JJC/II/2017,  dated 
22  Pebruari  2017  dengan  nilai  kontrak  sebesar  February 22, 2017 with a contract amounted 
Rp 13.530.786.800.000.   to Rp 13,530,786,800,000. 
 
5. PT Cinere Serpong Jaya – Proyek Jalan Tol   5. PT Cinere Serpong Jaya – Serpong –
Serpong – Cinere Cinere Toll Road Project
     
Perusahaan mengadakan kontrak pekerjaan untuk    The  Company  entered  into  a  construction 
pembangunan  Jalan  tol  Serpong  -  Cinere   contract  on  Serpong  -  Cinere  Toll  Road 
No.  10/KONTRAK-BOR/CSJ/2017  pada  tanggal   Project  No.  10/KONTRAK-BOR/CSJ/2017 
1  Agustus  2017  dengan  nilai  kontrak  sebesar     dated August 1, 2017 with contract value of 
Rp 2.176.302.377.681 (tanpa PPN).  Rp 2,176,302,377,681 (Exclude VAT). 
 

77
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
6. PT Angkasa Pura II (Persero) – Proyek   6. PT Angkasa Pura II (Persero) –
Pembangunan Sub Gardu Induk BSH AP II The Development of Sub Gardu Induk
BSH AP II Project
 
Perusahaan  mengadakan  kontrak  pekerjaan         The  Company  entered  into  a  construction 
untuk  Pembangunan  Sub  Gardu  Induk   contract  for  the  development  of                 
BSH  AP  II  No.PJJ.14.06/00.02/12/2016/0079  Sub  Gardu  Induk  BSH  AP  II  
addendum  PJJ.14.06/00/07/2018/0959  pada  No.  PJJ.14.06  /  00.02  /  12  /  2016  /  0079 
tanggal 30 Juli 2018 dengan nilai kontrak sebesar     addendum PJJ.14.06 / 00 / 07 / 2018 / 0959 
Rp 222.874.000.000 (tanpa PPN). dated  July  30,  2018  amounted  to                    
Rp 222,874,000,000 (Exclude VAT).
 
7. PT Hutama Marga Waskita – Proyek Jalan Tol 7. PT Hutama Marga Waskita – Tebing
Tebing Tinggi – Parapat Tinggi - Parapat Toll Road Project
     
Perusahaan mengadakan kontrak pekerjaan untuk    The  Company  entered  into  a  construction 
pembangunan  Jalan  Tol  Tebing  Tinggi  –  Parapat  contract  on  Tebing  Tinggi  –  Parapat  Toll 
No.  002/KONTRAK-HMW/VI/2018  tanggal  29 Juni  Road  Project  No.  002/KONTRAK-
2018 sebesar Rp 2.197.007.509.090.  HMW/2018  dated  June  29,  2018  amounted 
to Rp 2,197,007,509,090. 
 
8. Kementerian Perhubungan – Proyek LRT   8. Ministry of Transportation –
Sumatera Selatan The Development of South Sumatera LRT
Project
     
Perusahaan mengadakan kontrak pekerjaan untuk    The  Company  entered  into  a  construction 
pembangunan  proyek  LRT  Sumatera  Selatan  contract  on  the  development  of  South 
No. 01/KNT/LRTSS/VI/2016  dan  01/WK- Sumatera  LRT  No. 01/KNT/LRTSS/VI/2016 
KEMENHUB.LRT/D.II/2016  pada  tanggal  30  Juni  and  01/WK-KEMENHUB.LRT/D.II/2016 
2016  dengan  nilai  kontrak  sebesar                        dated June 30, 2016 with contract amounted 
Rp 9.948.900.909.091.  to Rp 9,948,900,909,091. 
     
9. PT Marga Trans Nusantara – Pembangunan   9. PT Marga Trans Nusantara –
Jalan Tol JORR II Ruas Kunciran-Serpong The Development of JORR II Toll Road
Paket 1 : Kunciran – Parigi Section Kunciran - Serpong Package 1:
Kunciran - Parigi
 
Perusahaan mengadakan kontrak pekerjaan untuk    The  company  entered  into  a  work  contract 
pembangunan  Jalan  tol  Serpong  -  Cinere  No.  for construction of the Serpong - Cinere Toll 
10/KONTRAK-BOR/CSJ/2017  pada  tanggal   Road  No.  10/KONTRAK-BOR/CSJ/2017  on 
1  Agustus  2017  dengan  nilai  kontrak  sebesar    August 1, 2017 with a contract amounted to 
Rp 2.176.302.377.681. Rp 2,176,302,377,681.
     
10. Kementerian Pekerjaan Umum dan Perumahan   10. Ministry of Public Works and Housing –
Rakyat – Proyek Pembangunan Wisma Atlet The Development of Wisma Atlet
Kemayoran Blok C2-2 dan D10-2 Kemayoran Block C2-2 and D10-2 Project
     
Perusahaan mengadakan kontrak pekerjaan untuk    The  Company  entered  into  a  construction 
pembangunan Wisma  Atlet  Kemayoran  Blok  C2-2  contract for the development of Wisma Atlet 
dan  D10-2  No.  KU.08.08/PK-RSBTII/SATKER- Kemayoran  Blok  C2-2  and  D10-2 
PRSS-DNB16-02/276  dan  KU.08.08/PK-RSBTII/  No. KU.08.08/PK-RSBTII/SATKER-PRSS-
SATKER-PRSS/DNB16-05/278  pada  tanggal  DNB16-02/276  dan  KU.08.08/PK-RSBTII/ 
17 Maret  2016  dengan  nilai  kontrak  sebesar  SATKER-PRSS/DNB16-05/278 dated March 
Rp 1.014.387.143.636.  17,  2016  with  a  contract  amounted  to 
Rp 1,014,387,143,636. 
     
 
 
 
 
 
 

78
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Mutasi  cadangan  kerugian  penurunan  nilai  tagihan    The  movements  of  allowance  for  impairment 
bruto – bagian tidak lancar adalah sebagai berikut:  losses  of  gross  amount  due  from  customers  – 
non-current position are as follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Saldo Awal/ Beginning Balance (373.477.461.097) (416.506.863.382)


Penambahan/ Addition (24.527.175.571) (75.839.925.990)
Pemulihan/ Recovery 6.483.162.118  50.189.417.672 
Reklasifikasi/ Reclassification (6.019.927.173) 68.679.910.603 
Saldo Akhir/ Ending Balance (397.541.401.723) (373.477.461.097)
 
Manajemen  berpendapat  bahwa  tagihan  bruto  dapat    The  management  believes  all  gross  amounts  due 
ditagihkan.  Manajemen  juga  berpendapat  bahwa  from  customers  are  collectible.  The  management 
cadangan  kerugian  penurunan  nilai  tagihan  bruto  also  believes that  allowance  for  impairment  losses 
adalah  cukup  untuk  menutupi  kemungkinan  tidak  of gross amount due from customers is sufficient to 
tertagihnya tagihan bruto di kemudian hari.  cover the possible losses on the uncollectible gross 
amount due from customers in the future. 
     
Pada  tanggal  30  September  2019,  nilai  penambahan    As  of  September  30,  2019,  the  additional  value  of 
atas cadangan kerugian penurunan nilai tagihan bruto  allowance  for  impairment  losses  on  gross  
kepada  pengguna  jasa  sebesar  Rp 24.527.175.571  amount  due  from  customers  amounted  to  
yang  terdiri  dari  Dinas  Pekerjaan  Umum  Tarakan  Rp  24,527,175,571  consist  of  Tarakan  Public 
sebesar  Rp  23.463.718.514  dan  PT  Citra  Ratna  Works  Service  amounted  to  Rp  23,463,718,514 
Nirmala  sebesar  Rp  1.063.457.057.  Nilai  pemulihan  and  PT  Citra  Ratna  Nirmala  amounted  to  
atas cadangan kerugian penurunan nilai tagihan bruto  Rp  1,063,457,057.  The  recovery  value  on 
kepada  pengguna  jasa  sebesar  Rp 6.483.162.118  allowance for impairment of gross amount due from 
yang terdiri dari Dinas Pekerjaan Umum Provinsi Riau  customers  amounted  to  Rp  6,483,162,118  consits 
sebesar  Rp 5.692.110.835,  Kementerian  Pekerjaan  of  Public Works Office of Riau Province amounted 
Umum  dan  Perumahan  Rakyat  sebesar   to  Rp  5,692,110,835,  the  Ministry  of  Public  
Rp  667.036.362  dan  PT  Harmas  Jalesveva  sebesar  Works  and  Housing  amounted  to  Rp  667,036,362 
Rp 124.014.921.   and  PT  Harmas  jalesveva  amounted  to  
Rp 124,014,921.  
     
Pada  tanggal  31  Desember  2018,  nilai  penambahan    As  of  December  31,  2018,  the  additional  value  of 
atas cadangan kerugian penurunan nilai tagihan bruto  allowance  for  impairment  losses  on  gross  
kepada  pengguna  jasa  sebesar  Rp 75.839.925.990  amount  due  from  customers  amounted  to  
yang  terdiri  dari  PT  PAL  Indonesia  (Persero)  sebesar                    
Rp  75,839,925,990  consists  of  PT  PAL  Indonesia 
Rp  37.796.106.830,  Perpustakaan  Nasional  sebesar  (Persero)  amounted  to  Rp  37,796,106,830, 
Rp  10.000.000.000,  Dinas  Pekerjaan  Umum  Karimun  National  Library  amounted  to  Rp  10,000,000,000, 
sebesar Rp 9.458.903.025, PT Broadbiz Asia sebesar  Karimun  Public  Works  Service  amounted  to  
Rp  6.437.849.729,  Dinas  Pekerjaan  Umum  Tarakan  Rp  9,458,903,025,  PT  Broadbiz  Asia  amounted  to 
sebesar  Rp  5.000.000.000,  Pemerintah  Daerah  Rp  6,437,849,729,  Tarakan  Public  Works  Service 
sebesar  Rp  4.958.812.019,  PT  Graha  Sarana  Duta  amounted  to  Rp  5,000,000,000,  Government 
sebesar  Rp  1.024.283.558,  PT  Mega  Pasanggrahan  District  amounted  to  Rp  4,958,812,019,  PT  Graha 
Indah  sebesar  Rp  1.002.983.752,  dan  Waskita  –  Sarana  Duta  amounted  to  Rp  1,024,283,558,  
Darmo  Permai  sebesar  Rp  160.987.077.  Nilai  PT  Mega  Pasanggrahan  Indah  amounted  to  
pemulihan  atas  cadangan  kerugian  penurunan  nilai  Rp  1,002,983,752,  and  Waskita  –  Darmo  Permai 
tagihan  bruto  kepada  pengguna  jasa  sebesar     amounted  to  Rp  160,987,077.  The  recovery  value 
Rp  50.189.417.672  yang  terdiri  dari  Kementerian  of  allowance  for  impairment  losses  on  gross 
Pekerjaan  Umum  dan  Perumahan  Rakyat  sebesar   amount  due  from  customers  amounted  to                     
Rp  26.460.495.973,  PT  Rekayasa  Industri  (Persero)  Rp  50,189,417,672  consists  of  the  Ministry  of 
sebesar  Rp  12.290.040.836,  PT  Perusahaan  Gas  Public  Works  and  Housing  amounted  to  
Negara  (Persero)  Tbk  sebesar  Rp  6.914.654.188,  Rp  26,460,495,973,  PT  Rekayasa  Industri 
Kementerian  Hukum  dan  Hak  Asasi  Manusia  sebesar  (Persero)  amounted  to  Rp  12,290,040,836,  
Rp  4.087.377.818,  dan  PT  Bali  Seminyak  Resort  PT  Perusahaan  Gas  Negara  (Persero)  Tbk 
sebesar Rp 436.848.857.  amounted to Rp 6,914,654,188, the Ministry of Law 
and Human Rights amounted to Rp 4,087,377,818 
and  PT  Bali  Seminyak  Resort  amounted  to  
Rp 436,848,857.                    
     
 

79
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Jumlah  tagihan  bruto  berdasarkan  umur  adalah    The  amount  of  gross  amount  due  from  customers 
sebagai berikut:  based on age are as follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Belum Jatuh Tempo 28.874.169.187.730  29.942.190.288.155  Before due date


Sudah Jatuh Tempo 505.425.788.799  1.309.139.722.099  After due date
> 181 - 360 Hari - Sudah Jatuh Tempo 165.588.727.180  696.788.580.344  > 181 - 360 days - After due date
> 360 Hari - Sudah Jatuh Tempo 854.731.906.397  776.092.033.601  > 360 days - After due date
Jumlah 30.399.915.610.106 32.724.210.624.199 Total

     
11. PERPAJAKAN    11. TAXES 
     
a. Pajak Dibayar Dimuka    a. Prepaid Taxes
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pasal 4 (2) 1.158.871.869  1.433.803.534  Article 4(2)
Pasal 22 Article 22
2019 67.568.759.201  --  2019
2018 13.311.506.242  13.311.506.242  2018
2017 40.300.500.159  40.284.349.330  2017
2016 16.150.829  16.150.829  2016
Pasal 23 Article 23
2019 24.209.513.211  --  2019
2018 1.634.905.464  1.634.905.464  2018
2017 2.491.228.447  2.491.228.447  2017
2016 2.829.513.314  2.829.513.314  2016
Pasal 25 Article 25
2019 104.625.092.901  --  2019
2017 384.000.000  384.000.000  2017
Pasal 28 Article 28
2018 278.170.929.110  228.543.955.814  2018
Pajak Pertambahan Nilai Value Added Tax
2019 1.358.835.448.284  --  2019
2018 325.180.121.107  325.180.121.107  2018
2017 1.649.143.045.450  1.649.143.045.450  2017
2016 478.969.781.661  478.969.781.661  2016
Jumlah 4.348.829.367.249 2.744.222.361.192 Total

 
b. Utang Pajak b. Taxes Payables
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Utang Pajak Jangka Pendek Short-Term Taxes Payable
Pasal 21 23.013.346.774  27.391.834.451  Article 21
Pasal 22 8.802.867.879  16.979.053.083  Article 22
Pasal 23 6.114.800.100  118.900.801.498  Article 23
Pajak Final Konstruksi 1.636.017.941.593  906.459.557.704  Construction Final Tax
Pajak Pertambahan Nilai 1.857.734.509.937  386.202.197.626  Value Added Tax
Pasal 4 (2) - Final 104.424.509.424  303.420.999.417  Article 4 (2) - Final
Pasal 29 122.674.688.628  269.254.188.862  Article 29
Total Utang Pajak Jangka Pendek 3.758.782.664.335 2.028.608.632.641 Total Short-Term Taxes Payable
Utang Pajak Jangka Panjang Long-Term Taxes Payable
Pajak Final Konstruksi --  805.408.693.733  Construction Final Tax
Total Utang Pajak Jangka Panjang -- 805.408.693.733 Total Long-Term Taxes Payable
Jumlah 3.758.782.664.335 2.834.017.326.374 Total
 
 
 
 
 
 
 
 

80
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
c. Beban Pajak Penghasilan c. Income Tax Expenses
   
30 September/ September 30,
2019 2018
Rp Rp

Pajak atas Pendapatan Non Final Non Final Income Tax
Perusahaan 25.882.575.250  102.744.583.000  The Company
Entitas Anak 134.761.418.781  671.016.599.684  Subsidiaries
Beban (Manfaat) Pajak Tangguhan 38.153.377.163  --  Deferred Tax Expenses (Benefit)
Jumlah 198.797.371.194 773.761.182.684 Total

 
30 September/ September 30,
2019 2018
Rp Rp

Pendapatan Perusahaan The Company's Revenues
Pendapatan Jasa Konstruksi 15.920.040.893.621  31.839.611.444.971  Construction Revenues
Dikurangi Deduction
Pendapatan Usaha yang Revenues that Funded by
Dibiayai oleh Pinjaman Luar Negeri (48.124.225.468) (777.891.726.590) Foreign Loan
Pendapatan Usaha Luar Negeri  Non Taxable Foreign 
Tidak Kena Pajak dan KSO (1.699.558.507.816) (1.566.730.529.436) Revenues and JV
Pendapatan Beda Waktu Time Differences
Pengenaan Pajak - Bersih (6.476.098.298.419) (17.270.405.162.945) Taxable Revenue  - Net
Pendapatan Jasa Konstruksi Taxable Income from
Kena Pajak Construction Revenues
Telah Terealisasi 7.696.259.861.918  12.224.584.026.000  Realized
Belum Terealisasi 8.240.632.306.769  34.308.517.711.467  Unrealized
Pendapatan Gedung yang Disewakan 854.501.367  968.862.730  Building Rental Revenues
Jumlah Pendapatan Kena Pajak 15.937.746.670.054 46.534.070.600.197 Total Taxable Income
Beban Pajak Final Final Tax Expenses
3% atas Pendapatan Jasa Konstruksi 478.106.765.061  1.395.993.052.124  3% of Construction Revenues
10 % atas Pendapatan Gedung yang Disewakan 85.450.137  96.886.273  10% of Building Rental Revenues
Jumlah Beban Pajak Final 478.192.215.198 1.396.089.938.397 Total Final Tax Expenses

30 September/ September 30,


2019 2018
Rp Rp

Pendapatan Non Final 328.750.303.326  653.803.636.107  Non Final Income

Perbedaan Tetap Permanent Difference
Beban Non Final 225.220.002.598  242.825.305.799  Non Final Expenses
Jumlah Laba kena Pajak 103.530.300.728  410.978.330.308  Total Taxable Income
Laba (Rugi) Kena Pajak 103.530.300.728  410.978.330.308  Total Taxable Income (Loss)

Beban Pajak Non Final Non Final Taxes Expenses
September 2019: 25%x Rp 103.530.300.728 25.882.575.250  --  September 2019: 25%x Rp 103,530,300,728
September 2018: 25%x Rp 410.978.330.308 --  102.744.583.000  September 2018: 25%x Rp 410,978,330,308
Jumlah Beban Pajak Non Final 25.882.575.250 102.744.583.000 Total Non Final Taxes Expenses

Dikurangi Pajak Dibayar Dimuka: Deducting Prepaid Taxes
PPh 22 14.216.557  1.831.016.469  Article 22
PPh 23 7.840.014.193  1.812.083.504  Article 23
PPh 24 --  760.849.435  Article 24
PPh 25 --  --  Article 25
Jumlah 7.854.230.750 4.403.949.408 Total
Pajak Non Final Terutang 18.028.344.500 98.340.633.592 Non Final Tax Payable

81
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
d. Pajak Tangguhan d. Deferred Tax
     
(Dibebankan) Dikreditkan (Dibebankan)
Dikreditkan ke ke Penghasilan
1 Januari/ Laba Rugi/(Charged) Komprehensif Lain/ 30 September/
January 1, Penyesuaian/ Credited to Profit Credited to September 30,
2019 Adjustment or Loss Other Comprehensive Income 2019
Rp Rp Rp Rp Rp

Aset Pajak Tangguhan/


Deferred Tax Assets
TJT 581.979.033  (576.097.320) 28.087.051  (33.968.764) -- 
CCT 143.819.850  --  71.551.133  (7.757.046) 207.613.937 
CTP 133.048.726  --  6.938.653  1.838.328  141.825.707 
WTR 66.990.246  --  185.075.048  (13.630.345) 238.434.949 
KKDM --  (1.672.195) (40.649.498) 42.321.693  -- 
WBP 631.410.216  --  --  --  631.410.216 
Jumlah Aset Pajak Tangguhan/
Total Deferred Tax Assets 1.557.248.071 (577.769.515) 251.002.387 (11.196.134) 1.219.284.809

Liabilitas Pajak Tangguhan/


Deferred Tax Liabilities
WBP --  --  1.022.753.973  --  (1.022.753.973)
TJT --  68.541.035  (7.815.246.405) --  7.883.787.440 
KKDM 50.323.695.776  (658.212.089) (11.456.998.592) --  61.122.482.279 
PBTR 1.315.064.304  --  (20.154.888.526) --  21.469.952.830 
WKR 2.723.876.393  64.103  --  --  2.723.940.496 
Jumlah Liabilitas Pajak Tangguhan/
Total Deferred Tax Liabilities 54.362.636.473 (589.606.951) (38.404.379.550) -- 92.177.409.072

(Dibebankan) Dikreditkan (Dibebankan)


Dikreditkan ke ke Penghasilan
1 Januari/ Laba Rugi/(Charged) Komprehensif Lain/ 31 Desember/
January 1, Penyesuaian/ Credited to Profit Credited to December 31 ,
2018 Adjustment or Loss Other Comprehensive Income 2018
Rp Rp Rp Rp Rp
Aset Pajak Tangguhan/
Deferred Tax Assets
TJT 1.834.047.166  --  (1.155.344.657) (96.723.476) 581.979.033 
CCT 126.112.719  --  44.996.593  (27.289.462) 143.819.850 
CTP --  --  145.605.691  (12.556.965) 133.048.726 
WTR --  --  82.504.735  (15.514.489) 66.990.246 
WBP 41.963.875.696  --  (41.533.040.343) 200.574.863  631.410.216 
Jumlah Aset Pajak Tangguhan/
Total Deferred Tax Assets 43.924.035.581 -- (42.415.277.981) 48.490.471 1.557.248.071

Liabilitas Pajak Tangguhan/


Deferred Tax Liabilities
PPTR 37.831.852.057  (37.831.852.057) --  --  -- 
KKDM 3.495.794.867  --  (46.778.916.954) 48.983.955  50.323.695.776 
PBTR --  --  (1.315.064.304) --  1.315.064.304 
WKR 1.725.928.190  7.565  (997.940.638) --  2.723.876.393 
Jumlah Liabilitas Pajak Tangguhan/
Total Deferred Tax Liabilities 43.053.575.114 (37.831.844.492) (49.091.921.896) 48.983.955 54.362.636.473

82
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
e. Surat Ketetapan Pajak e. Tax Assessment Letters
 
No Jenis Pajak/ Masa Pajak/ SKPLB/(SKPKB) Terima (Bayar)/
Type of Tax Period Nomor SKP/ Tanggal/ (Overpayment/Under Cash Receipt
Taxes SKP Number Date Payment Assessment) (Payment)
1 PPN Des-16 00011/407/16/093/19 05-Mar-19 320.441.716.778  Terima/ Receipt
2 PPN Des-16 00003/107/16/093/19 05-Mar-19 (26.905.531) Bayar/ Paid
3 PPN Des-16 00013/287/16/093/19 05-Mar-19 (5.871.490.796) Bayar/ Paid
4 PPN Des-16 00009/187/16/093/19 05-Mar-19 (21.337.306) Bayar/ Paid
5 PPh Pasal 21 Des-13 00330/101/13/701/18 01-Apr-19 (720.317) Bayar/ Paid
6 PPh Pasal 21 Feb-16 00285/101/16/831/18 01-Apr-19 (100.000) Bayar/ Paid
7 PPh Pasal 21 Jun-16 00286/101/16/831/18 01-Apr-19 (100.000) Bayar/ Paid
8 PPh Pasal 21 Mei-17 00128/101/17/114/18 01-Apr-19 (100.000) Bayar/ Paid
9 PPh Pasal 23 Des-14 00008/103/14/805/18 01-Apr-19 (21.368.112) Bayar/ Paid
10 PPh Pasal 21 Apr-17 00298/101/17/942/18 01-Apr-19 (101.668) Bayar/ Paid
11 PPh Pasal 21 Mar-17 00295/101/17/942/18 01-Apr-19 (101.668) Bayar/ Paid
12 PPh Pasal 21 Jan-17 00288/101/17/942/18 01-Apr-19 (100.000) Bayar/ Paid
13 PPh Pasal 21 Feb-17 00270/101/17/942/18 01-Apr-19 (100.000) Bayar/ Paid
14 PPh Pasal 21 Mei-17 00277/101/17/942/18 01-Apr-19 (100.000) Bayar/ Paid
15 PPh Pasal 21 Jun-17 00274/101/17/942/18 01-Apr-19 (14.076) Bayar/ Paid
16 PPh Pasal 21 Des-16 00008/101/16/904/19 01-Apr-19 (21.377) Bayar/ Paid
17 PPh Pasal 23 Nov-16 00007/103/16/646/19 01-Apr-19 (1.151.886) Bayar/ Paid
18 PPh Pasal 23 Jan-17 00001/103/17/646/19 01-Apr-19 (1.055.385) Bayar/ Paid
19 PPh Pasal 23 Jun-16 00002/103/16/646/19 01-Apr-19 (1.035.559) Bayar/ Paid
20 PPh Pasal 23 Sep-16 00005/103/16/646/19 01-Apr-19 (929.708) Bayar/ Paid
21 PPh Pasal 23 Agu-16 00004/103/16/646/19 01-Apr-19 (896.476) Bayar/ Paid
22 PPh Pasal 21 Jun-16 00010/101/16/646/19 01-Apr-19 (816.883) Bayar/ Paid
23 PPh Pasal 23 Okt-16 00006/103/16/646/19 01-Apr-19 (770.384) Bayar/ Paid
24 PPh Pasal 21 Sep-16 00013/101/16/646/19 01-Apr-19 (500.317) Bayar/ Paid
25 PPh Pasal 23 Mei-16 00001/103/16/646/19 01-Apr-19 (405.614) Bayar/ Paid
26 PPh Final Pasal 4(2) Jun-16 00006/140/16/646/19 01-Apr-19 (301.422) Bayar/ Paid
27 PPh Final Pasal 4(2) Nov-16 00010/140/16/646/19 01-Apr-19 (291.766) Bayar/ Paid
28 PPh Pasal 21 Mei-16 00009/101/16/646/19 01-Apr-19 (263.428) Bayar/ Paid
29 PPh Pasal 23 Jul-16 00003/103/16/646/19 01-Apr-19 (230.884) Bayar/ Paid
30 PPh Final Pasal 4(2) Mei-16 00005/140/16/646/19 01-Apr-19 (170.000) Bayar/ Paid
31 PPh Pasal 21 Jan-17 00012/101/17/646/19 01-Apr-19 (147.108) Bayar/ Paid
32 PPh Pasal 21 Agu-16 00012/101/16/646/19 01-Apr-19 (102.135) Bayar/ Paid
33 PPh Final Pasal 4(2) Jan-17 00038/140/17/646/19 01-Apr-19 (95.188) Bayar/ Paid
34 PPh Pasal 21 Jul-16 00011/101/16/646/19 01-Apr-19 (40.662) Bayar/ Paid
35 PPh Final Pasal 4(2) Sep-16 00009/140/16/646/19 01-Apr-19 (39.860) Bayar/ Paid
36 PPh Final Pasal 4(2) Jul-16 00007/140/16/646/19 01-Apr-19 (38.888) Bayar/ Paid
37 PPh Final Pasal 4(2) Agu-16 00008/140/16/646/19 01-Apr-19 (38.800) Bayar/ Paid
38 PPh Pasal 22 Des-17 00001/102/17/513/19 01-Apr-19 (21.644.685) Bayar/ Paid
39 PPh Pasal 22 Jan-18 00001/102/18/513/19 01-Apr-19 (31.761.481) Bayar/ Paid
40 PPh Pasal 21 Des-15 00116/101/15/805/19 01-Apr-19 (931.414) Bayar/ Paid
Jumlah / Total 314.435.395.994
 
 
Pada  tanggal  2  April  2019,  Perusahaan  menerima  On  April  2,  2019,  the  Company  has  received 
SKPLB  dari  KPP  atas  PPN  yang  mengkonfirmasi  TSO  of  VAT  to  confirm  overpayment  of 
kelebihan  pembayaran  Rp  320.599.233.221  dan  total  Rp  320,599,233,221  and  has  received 
menerima  Surat  Tagihan  Pajak  sebesar  Tax  Collection  Letter  amounted  to 
Rp  6.163.837.227  terkait  denda  pajak,  sehingga  Rp  6,163,837,227  related  to  administrative 
perusahaan menerima Rp 314.435.395.994.  sanction  of  tax,  so  the  Company  has  received 
amounted to Rp 314,435,395,994. 
 
No Jenis Pajak/ Masa Pajak/ Terima (Bayar)/
Type of Tax Period Nomor STP/ Tanggal/ STP/ Cash Receipt
Taxes STP Number Date Tax Collection Letter (Payment)
1 PPN Jan-17 00003/187/17/093/19 19-Mar-19 (527.579.325) Bayar/ Paid
2 PPN Feb-17 00004/187/17/093/19 19-Mar-19 (195.664.995) Bayar/ Paid
3 PPN Mar-17 00005/187/17/093/19 19-Mar-19 (80.871.771) Bayar/ Paid
4 PPN Apr-17 00006/187/17/093/19 19-Mar-19 (60.619.428) Bayar/ Paid
5 PPN Mei-17 00007/187/17/093/19 19-Mar-19 (24.316.480) Bayar/ Paid
6 PPN Jun-17 00008/187/17/093/19 19-Mar-19 (24.055.858) Bayar/ Paid
7 PPN Jul-17 00009/187/17/093/19 19-Mar-19 (4.855.558) Bayar/ Paid
8 PPN Agu-17 00010/187/17/093/19 19-Mar-19 (14.217.504) Bayar/ Paid
9 PPN Sep-17 00011/187/17/093/19 19-Mar-19 (20.763.868) Bayar/ Paid
10 PPN Okt-17 00012/187/17/093/19 19-Mar-19 (23.216.403) Bayar/ Paid
11 PPN Nov-17 00013/187/17/093/19 19-Mar-19 (26.143.846) Bayar/ Paid
12 PPN Des-17 00014/187/17/093/19 19-Mar-19 (4.721.037) Bayar/ Paid
13 PPN Jan-18 00024/187/18/093/19 27-Mar-19 (131.382.413) Bayar/ Paid
Jumlah / Total (1.138.408.486)

Pada  tanggal  5  April  2019,  Perusahaan  menerima  On  April  5,  2019,  the  Company  has  received 
beberapa  Surat  Tagihan  Pajak  sebesar  Tax  Collection  Letter  amounted  to 
Rp 1.138.408.486 terkait denda pajak.  Rp  1,138,408,486  related  to  administrative 
sanction of tax. 

83
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
12. UANG MUKA DAN BIAYA DIBAYAR DIMUKA    12. ADVANCES AND PREPAYMENTS 

30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

PPN Keluaran Yang Belum Diterima 849.138.007.921  570.369.470.561  VAT Out Not Yet Received


Uang Muka Kontrak 588.204.545.148  772.783.381.095  Advanced Contracts
Biaya Dibayar dimuka 98.729.237.144  52.127.276.897  Prepaid Expenses
Pendapatan Yang Masih Harus Diterima --  387.779.111  Accrued Revenue
Uang Muka Beban Umum Advances for General
dan Administrasi 9.846.089.693  1.453.262.340  and Administration 
Sewa Dibayar dimuka 5.776.066.407  5.417.418.363  Prepaid Rent
Lain-lain 7.719.325.561  5.481.572.252  Others
Jumlah 1.559.413.271.874 1.408.020.160.619 Total

 
Pajak  Pertambahan  Nilai  (PPN)  Keluaran  yang  belum    Value  Added  Tax  (VAT)  output  has  not  yet 
diterima  merupakan  pengakuan  PPN  keluaran  atas  received  recognition  of  VAT  output  on  receivable, 
termin  yang  telah  ditagihkan,  namun  belum  dibayar  nevertheless the owner has not paid yet. 
oleh pemberi kerja. 
 
Biaya  dibayar  dimuka  merupakan  biaya  yang    Prepayments  represent  the  cost  incurred  for 
dikeluarkan  untuk proyek-proyek  belum  berjalan, biaya  projects not yet started, the provision cost of Letter 
provisi  Letter  of  Credit  (L/C)  dan  Surat  Kredit  of  Credit  (L/C)  and  Surat  Kredit  Berdokumen 
Berdokumen  Dalam  Negeri  (SKBDN).  Penyelesaian  Dalam  Negeri  (SKBDN).  The  Completion 
biaya dibayar dimuka diperhitungkan pada saat proyek  prepayments is calculated when the projects start, 
sudah berjalan, untuk biaya provisi diakui setiap bulan.  for a fee provision is recognized each month. 
 
Uang  muka  kontrak  dan  uang  muka  pihak  ketiga    Advances  contracts  and  advances  to  third  parties 
diberikan  kepada  subkontraktor,  pemasok  dan  mandor  are  presented  to  subcontractors,  suppliers  and 
borong  yang  bekerja  pada  proyek  yang  dilaksanakan  the  entire  stock  who  worked  on  the  Group’s 
oleh  Grup.  Penyelesaian  uang  muka  akan  projects.  The  settlement  of  advance  will  be 
diperhitungkan  dengan  termin  yang  akan  dibayarkan  calculated by the invoice that will be paid related to 
kepada pihak ketiga yang bersangkutan.  third parties concerned. 
     
13. INVESTASI PADA ENTITAS ASOSIASI DAN   13. INVESTMENT IN ASSOCIATES AND JOINT
VENTURA BERSAMA  VENTURES 
     
Rincian  saldo  investasi  pada  entitas  asosiasi  dan    The  details  of  investments  in  associates  and  joint 
ventura bersama adalah sebagai berikut:  ventures are as follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Investasi pada Entitas Asosiasi/ Investments in Associates 5.182.207.807.366  4.190.650.156.054 
Investasi pada Ventura Bersama/ Investments in Joint Ventures 2.505.417.340.940  2.460.822.014.487 
Jumlah/ Total 7.687.625.148.306 6.651.472.170.541
 
Investasi pada Entitas Asosiasi    Investment in Associates Entities 
     
Rincian  saldo  investasi  pada  entitas  asosiasi  adalah    Details  of  investments  in  associate  entities  are  as 
sebagai berikut:  follows: 
     
30 September/ 31 Desember/ Aktivitas utama/ Kedudukan/
September 30, 2019 December 31, 2018 Principal activity Domicile
Rp Rp
PT Jasamarga Semarang Batang 1.281.435.455.565  1.338.240.345.233  Operator Jalan Tol/ Toll operator Indonesia
PT Jasamarga Solo Ngawi 1.226.073.887.522  829.436.785.542  Operator Jalan Tol/ Toll operator Indonesia
PT Waskita Transjawa Toll Road 1.188.498.247.449  820.612.697.793  Operator Jalan Tol/ Toll operator Indonesia
PT Jasamarga Ngawi Kertosono Kediri 411.530.172.321  400.585.763.982  Operator Jalan Tol/ Toll operator Indonesia
PT Jasamarga Kualanamu Tol  390.500.363.893  383.883.884.651  Operator Jalan Tol/ Toll operator Indonesia
PT Citra Waspphutowa  340.094.152.841  279.845.099.634  Operator Jalan Tol/ Toll operator Indonesia
PT Cinere Serpong Jaya  299.011.522.688  107.750.508.796  Operator Jalan Tol/ Toll operator Indonesia
PT Hutama Marga Waskita 25.789.005.087  26.545.070.423  Operator Jalan Tol/ Toll operator Indonesia
PT Hotel Karya Indonesia 15.525.000.000  --  Hotel/ Hotel Indonesia
PT Waskita Bali Mandara 3.750.000.000  3.750.000.000  Operator Jalan Tol/ Toll operator Indonesia
Jumlah/ Total 5.182.207.807.366 4.190.650.156.054
 
 

84
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Rincian  dan  mutasi  investasi  pada  entitas  asosiasi  The  details  of ownership  interest  and  movements 
pada  tanggal  30  September  2019  dan  31  Desember  of  investment  in  associate  entities  as  of 
2018 adalah sebagai berikut:  September 30, 2019 and December 31, 2018 are 
as follows: 
   
30 September/ September 30, 2019
Bagian laba (rugi)
Saldo awal/ entitas asosiasi/
Beginning Penambahan/ Equity in net income Pengurangan/ Saldo akhir/
% balance Addition (loss) associates Deduction Ending balance
Rp Rp Rp Rp Rp

PT Jasamarga Semarang Batang 40 1.338.240.345.233 --  (56.804.889.668) --  1.281.435.455.565 


PT Jasamarga Solo Ngawi 40 829.436.785.542 454.520.000.000 (57.882.898.020) --  1.226.073.887.522 
PT Waskita Transjawa Toll Road 30 820.612.697.793 420.070.567.530 (52.185.017.874) --  1.188.498.247.449 
PT Jasamarga Ngawi Kertosono Kediri 40 400.585.763.982 29.109.344.000 (18.164.935.661) --  411.530.172.321 
PT Jasamarga Kualanamu Tol 30 383.883.884.651 18.000.000.000 (11.383.520.758) --  390.500.363.893 
PT Citra Waspphutowa 25 279.845.099.634 61.000.000.000 (750.946.793) --  340.094.152.841 
PT Cinere Serpong Jaya 35 107.750.508.796 191.533.669.600 (272.655.708) --  299.011.522.688 
PT Hutama Marga Waskita 30 26.545.070.423 --  (756.065.336) --  25.789.005.087 
PT Hotel Karya Indonesia 25 --  15.525.000.000 --  --  15.525.000.000 
PT Waskita Bali Mandara 60 3.750.000.000 --  --  --  3.750.000.000 
Jumlah/ Total 4.190.650.156.054 1.189.758.581.130 (198.200.929.818) -- 5.182.207.807.366

31 Desember/ December 31, 2018


Bagian laba (rugi)
Saldo awal/ entitas asosiasi/
Beginning Penambahan/ Equity in net income Pengurangan/ Saldo akhir/
% balance Addition (loss) associates Deduction Ending balance
Rp Rp Rp Rp Rp

PT Jasamarga Semarang Batang 40 61.553.113.737 1.272.007.560.000 4.679.671.496  --  1.338.240.345.233 


PT Jasamarga Solo Ngawi (JSN)
(d/h/ formerly  PT Solo Ngawi Jaya) 40 549.938.491.414 303.112.084.000 (23.613.789.872) --  829.436.785.542 
PT Waskita Transjawa Toll Road 30 --  904.536.000.000 (83.923.302.207) --  820.612.697.793 
PT Jasamarga Ngawi Kertosono Kediri (JNKK)
(d/h/ formerly  PT Ngawi Kertosono Jaya) 40 380.675.125.233 79.200.000.000 (59.289.361.251) --  400.585.763.982 
PT Jasamarga Kualanamu Tol 30 296.426.884.210 115.710.000.000 (28.252.999.559) --  383.883.884.651 
PT Citra Waspphutowa 25 256.178.814.687 25.000.000.000 (1.333.715.053) --  279.845.099.634 
PT Cinere Serpong Jaya 35 88.573.776.863 18.536.700.000 640.031.933  --  107.750.508.796 
PT Hutama Marga Waskita 30 4.048.372.535 22.800.000.000 (303.302.112) --  26.545.070.423 
PT Waskita Bali Mandara 60 3.750.000.000 --  --  --  3.750.000.000 
PT Jasamarga Transjawa Tol 35 437.500.000 --  --  (437.500.000) -- 
PT Jasamarga Probolinggo Banyuwangi 40 --  200.000.000 --  (200.000.000) -- 
Jumlah/ Total 1.641.582.078.679 2.741.102.344.000 (191.396.766.625) (637.500.000) 4.190.650.156.054

 
PT Waskita Transjawa Toll Road (WTTR) PT Waskita Transjawa Toll Road (WTTR)
     
Pendirian  PT  Waskita  MNC  Transjawa  Toll  Road    The establishment of PT Waskita MNC Transjawa 
(entitas anak WTR) adalah sesuai dengan akta notaris  Toll  Road  (subsidiary  of  WTR)  was  based  on 
Fathiah  Helmi,  S.H.,  No. 25  tanggal  28  September  notarial deed No. 25 dated September 28, 2015 of 
2015.  Akta  pendirian  ini  telah  mendapat  pengesahan  notary Fathiah Helmi, S.H. This notarial deed has 
Menteri Hukum dan Hak Asasi Manusia sesuai dengan  been  approved  by  The  Minister  of  Law 
Surat Keputusan No. AHU-2458481. AH.01.01.TH.2015  and Human  Rights  through  decision  letter  
tanggal 29 September 2015.  No.  AHU-2458481.AH.01.01.TH.2015  dated 
September 29, 2015. 
     
Berdasarkan  akta  notaris  Catur  Virgo,  S.H.,  M.H.,    Based  on  notarial  deed  Catur  Virgo,  S.H.,  M.H., 
No.  32  tanggal  27  Mei  2016  telah  disetujui  perubahan  No.  32  dated  May  27,  2016  which  approved  to 
nama  dari  “PT  Waskita  MNC  Transjawa  Toll  Road”  changing  the  name  of  “PT Waskita  MNC 
menjadi  “PT Waskita  Transjawa  Toll  Road”.  Akta  Transjawa Toll Road” into “PT Waskita Transjawa 
tersebut  telah  disahkan  oleh  Menteri  Hukum  dan  Hak  Toll  Road”.  The  deed  was  approved  by  
Asasi  Manusia  dalam  surat  keputusan  No.  AHU- the  Minister  of  Law  and  Human  Rights  through 
AH.01.03-005.3.001 tanggal 31 Mei 2016.  decision  letter  No.  AHU-AH.01.03-005.3.001 
dated May 31, 2016. 
 
Berdasarkan akta notaris No. 23 tanggal 10 April 2018    Based  on  notarial  deed  No.  23  dated  April  10, 
oleh  Ir.  Nanette  Cahyanie  Handari  Adi  Warsito,  S.H.,  2018  by  Ir.  Nanette  Cahyanie  Handari  Adi 

85
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
grup  menjual  57.14%  kepemilikan  saham  di  WTTR  Warsito,  S.H., the  group sold its  shares  of WTTR 
dengan  harga  sebesar  Rp  2.857.143.347.539.  with  57,14%  ownership  at  a  price  of        
Kepemilikan  saham  Grup  di  WTTR  menjadi  sebesar  Rp  2,857,143,347,539.  The  Group’s  share 
42.85% setelah penjualan tersebut. Akta tersebut telah  ownership  in  WTTR  became  42,85%  after         
disahkan  oleh  Menteri  Hukum  dan  Hak  Asasi  Manusia  the  sales  of  share  transaction.  The  deed  was 
Republik  Indonesia  dalam  Surat  Keputusan  No.  AHU- approved  by  the  Minister  of  Law  and  Human 
0050658.AH.01.11 tanggal 11 April 2018.  Rights of the Republic Indonesia through decision 
letter  No.  AHU-0050658.AH.01.11  dated  April  11, 
2018. 
     
Berdasarkan akta notaris No. 26 tanggal 11 April 2018    Based  on  notarial  deed  No.  26  dated  April  11, 
oleh  Ir.  Nanette  Cahyanie  Handari  Adi  Warsito,  S.H.,  2018  by  Ir.  Nanette  Cahyanie  Handari  Adi 
Kepemilikan  saham  Grup  di  WTTR  menjadi  sebesar  Warsito,  S.H.,  The  Company’s  share  ownership     
29,99%.  Akta  tersebut  telah  disahkan  oleh  Menteri  in  WTTR  became  29.99%.  The  deed  was 
Hukum  dan  Hak  Asasi  Manusia  Republik  Indonesia  approved  by  the  Minister  of  Law  and  Human 
dalam  Surat  Keputusan  No.  AHU-AH.01.03-0144385  Rights  of  The  Republic  of  Indonesia  through 
tanggal 12 April 2018.  decision  letter  No.  AHU-AH.01.03-0144385  dated 
April 12, 2018. 
     
Anggaran  Dasar  Perusahaan  telah  beberapa  kali    The  Company's  Articles  of  Association  has  been 
mengalami  perubahan,  terakhir  berdasarkan  Akta  amended  for  several  times,  most  recently  by         
notaris  No.  62  tanggal  23  Mei  2018  dari  notaris   the  Notarial  deed  No.  62  dated  May  23,  2018  of  
Ir.  Nanette  Cahyanie  Handari  Adi  Warsito,  S.H.,  yang  Ir.  Nanette  Cahyanie  Handari  Adi  Warsito,  S.H., 
telah  disetujui  oleh  Menteri  Hukum  dan  Hak  Asasi  which  has  been  approved  by  the  Minister  of  Law 
Manusia  Republik  Indonesia  dengan  Surat  Keputusan  and Human Rights of the Republic of Indonesia in 
No. AHU-AH.01.03-0215105 tanggal 12 Juni 2018.  Decision Letter No. AHU-AH.01.03-0215105 dated 
June 12, 2018. 
     
WTR  melakukan  Put  Option  atas  Kepemilikan    WTR  performed  a  Put  Option  on  Ownership 
saham  di  WTTR  sebesar  4,75%,  sesuai  dengan  Shares  in  WTTR  as  big  as  4.75%,  based  on 
Perjanjian  Antar  Pemegang  Saham  No.  25   shareholders  agreement  No.  25  dated  April  10, 
tanggal  10  April  2018  Pasal  6.3  perihal  Pengalihan  2018 article 6.3 regarding the transfer of shares – 
Saham  –  Put  Option  dan  Call  Option  sebesar   Put  Option  and  Call  Option  amounting  to  
Rp 420.070.567.530.  Rp 420,070,567,530. 
     
PT Jasamarga Solo Ngawi (JSN)   PT Jasamarga Solo Ngawi (JSN)
     
WTR,  entitas  anak,  memiliki  penyertaan  sebesar  40%    WTR,  a  subsidiary,  has  an  investment  of  40%  in 
pada  JSN  atau  setara  Rp  166.820.000.000,  JSN  or  equivalent  to  Rp 166,820,000,000,  based 
berdasarkan  Akta  Pengambilalihan  Saham  No.  34,  on      the  Deed  of  Acquisition  Share  No.  34  of 
Notaris Fathiah Helmi, S.H, pada tanggal 10 Juni 2015.  Notary Fathiah Helmi, S.H., dated June 10, 2015. 
     
WTR  menambah  penyertaan  pada  JSN  sebesar    WTR increased its investment in JSN amounted to 
Rp  96.404.000.000,  berdasarkan  Keputusan  Sirkular  Rp  96,404,000,000,  based  on  the  decree  of              
Rapat Umum Pemegang Saham  (RUPS) tanggal 9 Juli  the  Circular  of  General  Meeting  of  Shareholders 
2015.  (GMS) dated July 9, 2015. 
     
WTR  menambah  penyertaan  melalui  konversi  utang    WTR  increased  its  investment  through  conversion 
pada  JSN  sebesar  Rp  1.075.839.217,  berdasarkan  of  debt  in  JSN  amounted  to        
Berita  Acara  Utang-Piutang  antara  PT Jasa  Marga  Rp  1,075,839,217,  based  on The  Minutes  of  Debt 
(Persero) Tbk, WTR dan JSN tanggal 30 Juni 2016.  between PT Jasa Marga (Persero) Tbk, WTR and 
JSN dated June 30, 2016. 
     
WTR  menambah  penyertaan  pada  JSN  sebesar    WTR increased more investment in JSN amounted 
Rp  48.717.196.000,  berdasarkan  Keputusan  Sirkular  to  Rp  48,717,196,000,  based  on  the  decree  of           
RUPS tanggal 11 Pebruari 2016.  the Circular of GMS dated February 11, 2016. 
     
WTR  menambah  penyertaan  pada  JSN  sebesar    WTR increased its investment in JSN amounted to 
Rp 47.293.496.800,  berdasarkan  Keputusan  Sirkular  Rp  47,293,496,800,  based  on  Shareholders’ 
Rapat  Umum  Pemegang  Saham  (RUPS)  tanggal  General  Meeting  Circular  (GMS)  decision  dated 
18 Agustus 2016.  August 18, 2016. 
     
 
 

86
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
WTR  menambah  penyertaan  pada  JSN  sebesar    WTR increased its investment in JSN amounted to  
Rp 74.448.000.000, berdasarkan Akta No. 4 dari Notaris  Rp  74,448,000,000,  based  on  the  notarial  deed 
Ati Mulyati, S.H., M.Kn., tanggal 19 Juli 2017.  No. 4 by notary Ati Mulyati, S.H., M.Kn., dated July 
19, 2017. 
     
WTR  menambah  penyertaan  pada  JSN  sebesar    WTR increased its investment in JSN amounted to  
Rp  101.332.792.000,  berdasarkan  Akta  No.  5  dari  Rp  101,332,792,000,  based  on  the  notarial  deed 
Notaris  Ati  Mulyati,  S.H.,  M.Kn.,  tanggal  18  Oktober  No.  5  by  notary  Ati  Mulyati,  S.H.,  M.Kn.,  dated 
2017.  October 18, 2017. 
     
Berdasarkan akta notaris Windalina, S.H., No. 3 tanggal    Based  on  notarial  deed  Windalina,  S.H.,  No.  3 
27  Pebruari  2018  telah  disetujui  perubahan  nama  dari  dated  February  27,  2018  which  approved  to 
“PT  Solo  Ngawi  Jaya”  menjadi  “PT Jasamarga  Solo  changing  the  name  of  “PT Solo  Ngawi  Jaya”  into   
Ngawi”.  Akta  tersebut  telah  disahkan  oleh  Menteri  “PT  Jasamarga  Solo  Ngawi”.  The  deed  was 
Hukum dan Hak Asasi  Manusia  dalam surat keputusan  approved  by  the  Minister  of  Law  and  Human 
No. AHU-AH.01.03-0087454 tanggal 28 Pebruari 2018.  Rights  in  decision  letter  No.  AHU-AH.01.03-
0087454 dated February 28, 2018. 
 
WTR  menambah  penyertaan  pada  JSN  sehingga    WTR  increased  its  investment  in  JSN  increasing 
kepemilikan menjadi   Rp 534.911.388.000, berdasarkan  their  ownership  to  Rp  534,911,388,000,  based  on 
Akta  No.  5  dari  Notaris  Lintar  Trie  Utami,  S.H.  tanggal  the notarial deed No. 5 by notary Lintar Trie Utami, 
18  Mei  2018,  yang  telah  disahkan  oleh  Menteri  Hukum  S.H.,  dated  May 18,  2018  which  has  been 
dan  Hak  Asasi  Manusia  dalam  surat  keputusan  approved by the Minister of Law and Human Rights 
No. AHU-AH.01.03-0208162 tanggal 22 Mei 2018.   in  decision  letter  No.  AHU-AH.01.03-0208162 
dated May 22, 2018. 
     
WTR  menambah  penyertaan  pada  JSN  sebesar            WTR increased its investment in JSN amounted to 
Rp  303.112.040.000,  berdasarkan  Akta  No.  3  dari  Rp  303,112,040,000,  based  on  the  notarial  deed 
Notaris Windalina, S.H., tanggal 13 Desember 2018. No.  3  by  Windalina,  S.H.,  dated  December  13, 
2018.
 
PT Jasamarga Ngawi Kertosono Kediri (JNKK)    PT Jasamarga Ngawi Kertosono Kediri (JNKK) 
     
WTR,  entitas  anak,  memiliki  penyertaan  sebesar  40%    WTR,  a  subsidiary,  has  an  investment  of  40%  in 
pada JNKK atau setara Rp 8.780.000.000, berdasarkan  JNKK  or  equal  to  Rp  8,780,000,000,  based  on  
Akta  Pengambilalihan  Saham  No.  35,  Notaris  Fathiah  the  Deed  of  Acquisition  Share  No.  35  of  Notary 
Helmi, S.H.  Fathiah Helmi, S.H. 
     
WTR  menambah  penyertaan melalui  utang  pada  JNKK    WTR  increased  its  investment  through  a  debt  in 
sebesar  Rp  2.898.818.457,  berdasarkan  Keputusan  JNKK  amounted  to  Rp  2,898,818,457,  based  on 
Sirkular RUPS tanggal 17 Juni 2015.  the decree of the Circular of GMS of Shareholders 
dated June 17, 2015. 
     
WTR  menambah  penyertaan  pada  JNKK  sebesar    WTR  increased  its  investment  in  JNKK  amounted 
Rp  55.435.600.000,  berdasarkan  Keputusan  Sirkular  to  Rp  55,435,600,000,  based  on  the  decree  of               
RUPS tanggal 7 Juli 2015. the Circular of GMS dated July 7, 2015.
     
WTR  menambah  penyertaan  pada  JNKK  sebesar    WTR  increased  its  investment  in  JNKK  amounted 
Rp  19.325.680.000,  berdasarkan  Keputusan  Sirkular  to  Rp  19,325,680,000,  based  on  the  decree  of               
RUPS tanggal 11 Pebruari 2016.  the Circular GMS dated February 11, 2016. 
     
WTR  menambah  penyertaan  pada  JNKK  sebesar    WTR  increased  its  investment  in  JNKK  amounted 
Rp  33.248.952.000,  berdasarkan  Keputusan  Sirkular  to  Rp  33,248,952,000,  based  on  the  decree  of       
RUPS tanggal 15 Juni 2016.  the Circular of GMS dated June 15, 2016. 
     
WTR  menambah  penyertaan  pada  JNKK  sebesar    WTR  increased  its  investment  in  JNKK  amounted 
Rp  48.171.200.000,  berdasarkan  Keputusan  Sirkular  to  Rp  48,171,200,000,  based  on  the  decree  of       
RUPS tanggal 18 Agustus 2016.  the Circular GMS dated August 18, 2016. 
     
WTR  menambah  penyertaan  pada  JNKK  sebesar    WTR  increased  its  investment  in  JNKK  amounted 
Rp  111.138.588.000,  berdasarkan  Akta  No.  21  dari  to Rp 111,138,588,000, based on the notarial deed 
Notaris  Julius  Purnawan,  S.H.,  M.Si.,  tanggal  26  April  No.  21  by  notary  Julius  Purnawan,  S.H.,  M.Si., 
2017.  dated April 26, 2017. 
     

87
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
WTR  menambah  penyertaan  pada  JNKK  sebesar    WTR  increased  its  investment  in  JNKK  amounted 
Rp  90.825.240.000,  berdasarkan  Akta  No. 10  dari  to  Rp  90,825,240,000,  based on  the  notarial  deed 
Notaris  Julius  Purnawan,  S.H.,  M.Si.,  tanggal  28  Juli  No.  10  of  notary  Julius  Purnawan,  S.H.,  M.Si., 
2017.  dated July 28, 2017. 
     
Berdasarkan  akta  notaris  Julius  Purnawan,  S.H.,  M.Si.,    Based  on  notarial  deed  Julius  Purnawan,  S.H., 
No.  2  tanggal  9  April  2018  telah  disetujui  perubahan  M.Si., No. 2 dated April 9, 2018 which approved to 
nama  dari  “PT  Ngawi  Kertosono  Jaya”  menjadi  changing  the  name of  “PT Ngawi  Kertosono Jaya” 
“PT Jasamarga  Ngawi  Kertosono  Kediri”.  Akta  tersebut  into  “PT  Jasamarga  Ngawi  Kertosono  Kediri”.     
telah  disahkan  oleh  Menteri  Hukum  dan  Hak  Asasi  The  deed  was  approved  by  the  Minister  of  Law  
Manusia  dalam  surat  keputusan  No.  AHU- and  Human  Rights  in  decision  letter  
0007980.AH.01.02.TAHUN 2018 tanggal 10 April 2018.  No.  AHU-0007980.AH.01.02.  TAHUN  2018  dated 
April 10, 2018. 
     
WTR  menambah  penyertaan  pada  JNKK  sebesar    WTR  increased  its  investment  in  JNKK  amounted 
Rp  29.103.344.000,  berdasarkan  Akta  No. 59  dari  to  Rp  29,103,344,000,  based on  the  notarial  deed 
Notaris Sakti Lo, S.H., tanggal 6 September 2019, yang  No.  59  of  notary  Sakti  Lo,  S.H.,  dated  September 
telah  disahkan  oleh  Menteri  Hukum  dan  Hak  Asasi  6, 2019, which has been approved by the Minister 
Manusia  dalam  surat  keputusan  No.  AHU-AH.01.03- of  Law  and  Human  Rights  in  decision  letter  
0332166 tanggal 16 September 2019.  No.  AHU-AH.01.03-0332166  dated  September  16, 
2019. 

PT Jasamarga Kualanamu Tol (JMKT)   PT Jasamarga Kualanamu Tol (JMKT)


     
WTR, entitas anak, memiliki penyertaan sebesar 15% di    WTR,  a  subsidiary,  has  investments  of  15%  in 
JMKT atau sebesar Rp 31.250.000.000. JMKT didirikan  JMKT amounted to Rp 31,250,000,000. JMKT was 
sesuai  Akta  Pendirian  dari  Notaris  Ni  Nyoman  Rai  established based on the Notarial deed of notary Ni 
Sumawati,  S.H.,  No.  56  tanggal  25  Nopember  2014,  Nyoman  Rai  Sumawati,  S.H.,  No.  56  dated 
bergerak di bidang pengusahaan jalan.  November 25, 2014 engaged in toll road.
   
WTR  menambah  penyertaan  pada  JMKT  sebesar    WTR  increased  its  investment  in  JMKT  amounted 
Rp  10.050.000.000  berdasarkan  Keputusan  Sirkular  to  Rp  10,050,000,000,  based  on  the  decree  of           
RUPS tanggal 23 Januari 2016.  the Circular of GMS dated January 23, 2016. 
 
WTR  menambah  penyertaan  pada  JMKT  sebesar    WTR  increased  its  investment  in  JMKT  amounted 
Rp  18.450.000.000  berdasarkan  Keputusan  Sirkular  to  Rp  18,450,000,000,  based  on  the  decree  of           
RUPS tanggal 16 Mei 2016.  the Circular of GMS dated May 16, 2016. 
 
WTR  menambah  penyertaan  pada  JMKT  sebesar    WTR  increased  its  investment  in  JMKT  amounted 
Rp  18.000.000.000  berdasarkan  Keputusan  Sirkular  to  Rp  18,000,000,000,  based  on  the  decree  of           
RUPS tanggal 22 Juli 2016.  the Circular of GMS dated July 22, 2016. 
     
WTR  menambah  penyertaan  pada  JMKT  sebesar    WTR  increased  its  investment  in  JMKT  amounted 
Rp  19.500.000.000  berdasarkan  Keputusan  Sirkular  to  Rp  19,500,000,000,  based  on  decree  of          
RUPS pada Januari 2017.  the Circular of GMS in January 2017. 
     
Pada tanggal 24 Maret 2017 sesuai dengan Akta No. 22    On  March  24,  2017  based  on  the  Notarial  deed  
dari  Notaris  Ni  Nyoman  Rai  Sumawati,  S.H.,  M.Kn.,  No.  22  by  Ni  Nyoman  Rai  Sumawati,  S.H.,  M.Kn., 
WTR  membeli  saham  JMKT  yang  dimiliki  oleh  WTR  bought  the  shares  of  JMKT  owned  by  
Perusahaan Persero Tbk sebesar    Rp 85.000.000.000  the Company Tbk amounted to Rp 85,000,000,000 
dengan  disagio  saham  sebesar      Rp  20.500.000.000,  with  a  share  disagio  of  Rp  20,500,000,000. 
sehingga kepemilikan menjadi 30%.  Resulting  in  the  increase  of  the  Company’s 
partcipation becoming 30%. 
     
WTR  menambah  penyertaan  berdasarkan  Akta  No.  14    WTR  increased  its  investment  based  on               
dari  Notaris  Ni  Nyoman  Rai  Sumawati,  S.H.,  M.Kn.,  the  notarial  deed  No.  14  by  Ni  Nyoman  Rai 
tanggal  15  Mei  2017  pada  JMKT  sebesar   Sumawati,  S.H.,  M.Kn.,  dated  May  15,  2017  in 
Rp 19.500.000.000  JMKT amounted to Rp 19,500,000,000. 
     
WTR  menambah  penyertaan  berdasarkan  Akta  No.  1    WTR  increased  its  investment  based  on               
dari  Notaris  Ni  Nyoman  Rai  Sumawati,  S.H.,  M.Kn.,  the  notarial  deed  No.  1  by  Ni  Nyoman  Rai 
tanggal  5  Juni  2017  pada  JMKT  sebesar   Sumawati,  S.H.,  M.Kn.,  dated  June  5,  2017  in 
Rp 60.000.000.000.  JMKT amounted to Rp 60,000,000,000. 

88
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
WTR  menambah  penyertaan  berdasarkan  Akta  No.  25    WTR  increased  its  investment  based  on              
dari  Notaris  Ni  Nyoman  Rai  Sumawati,  S.H.,  M.Kn.,  the  notarial  deed  No.  25  by  Ni  Nyoman  Rai 
tanggal  31  Oktober  2017  pada  JMKT  sebesar   Sumawati, S.H., M.Kn., dated October 31, 2017 in 
Rp 61.500.000.000.  JMKT amounted to Rp 61,500,000,000. 
     
WTR  menambah  penyertaan  berdasarkan  Akta    WTR  increased  its  investment  based  on  
No.  02  dari  Notaris  Ni  Nyoman  Rai  Sumawati,  S.H.,  the  notarial  deed  No.  2  by  Ni  Nyoman  Rai 
M.Kn.,  tanggal  04  Juli  2018  pada  JMKT  sebesar                Sumawati,  S.H.,  M.Kn.,  dated  July  04,  2018  in 
Rp 115.710.000.000.  JMKT amounted to Rp 115,710,000,000. 

PT Citra Waspphutowa (CW)   PT Citra Waspphutowa (CW)


 
Perusahaan  dan  WTR  masing-masing  memiliki    The Company and WTR each owns investments of 
penyertaan  sebesar  12,50%  pada  CW  atau  setara  12.50%  in  CW  or  equivalent  to       
Rp  125.000.000.000  yang  didirikan  sesuai  Akta  Rp  125,000,000,000.  This  entity  was  established 
Pendirian  No.  10  tanggal  13  Januari  2006  dari  Notaris  based  on  the  Notarial  deed  No.  10  dated 
Drs.  Soegeng  Santosa,  S.H.,  M.H.,  bergerak  di  bidang  January 13, 2006 of Notary Drs. Soegeng Santosa, 
pengusahaan jalan tol. S.H., M.H., engaged in toll concession right.
     
Pada  tanggal  5  April  2017,  sesuai  dengan  Akta  No.  13    On  April  5,  2017,  based  on  the  notarial  deed  
dari Notaris Irma Devita Purnamasari, S.H., M.Kn., WTR  No.  13  by  Irma  Devita  Purnamasari,  S.H.,  M.Kn.,  
membeli  saham  CW  yang  dimiliki  oleh  Perusahaan  WTR  bought  the  shares  of  CW  owned  by  
sebesar  Rp  132.000.000.000  dengan  disagio  saham  the  Company  amounted  to  Rp  132,000,000,000 
sebesar  Rp  63.467.953.607  sehingga  kepemilikan  with  a  share  disagio  of  Rp  63,467,953,607.         
Perusahaan menjadi 25%.  Resulting  in  the  increase  of  the  Company’s 
ownership becoming 25%. 
     
WTR  menambah  penyertaan  pada  CW  sebesar    WTR  increased  investment  in  CW  amounted  to  
Rp  20.000.000.000  berdasarkan  Keputusan  Sirkular  Rp  20,000,000,000  based  on  Circular  Resolution 
RUPS tanggal 25 Juli 2017.  of the GMS dated July 25, 2017. 
 
WTR  menambah  penyertaan  pada  CW  sebesar    WTR  increased  investment  in  CW  amounted  to  
Rp  45.000.000.000,  berdasarkan  Keputusan  Sirkular  di  Rp  45,000,000,000,  based  on  circular  GMS 
Luar RUPS pada Desember 2017.  decision in December 2017. 
     
WTR  menambah  penyertaan  pada  CW  sehingga  total    WTR  increased  its  investment  in  CW  so  that        
penyertaan  menjadi  Rp  165.000.000.000,  berdasarkan  the  total  ownership  will  be  Rp  165,000,000,000, 
Keputusan  Sirkular  di  Luar  RUPS  pada  20  Pebruari  based  on  Circular  Decision  outside  the  GMS  on 
2018 sesuai Akta No. 42 tanggal 28 Pebruari 2018 dari  February  20,  2018  based  on  Deed  No.  42  dated 
Notaris Dewantari Handayani, S.H., M.PA.  February 28, 2018 of Notary Dewantari Handayani, 
S.H., M.PA. 
     
PT Cinere Serpong Jaya (CSJ)    PT Cinere Serpong Jaya (CSJ) 
     
WTR,  entitas  anak,  memiliki  penyertaan  sebesar  35%    WTR a subsidiary, has investments of 35% in CSJ 
pada CSJ atau setara Rp 70.000.000.000, berdasarkan  or equal to Rp 70,000,000,000, based on the Deed 
Akta Pengambilalihan Saham No. 35 oleh Notaris Jose  of  Acquisition  Share  No.  35  of  notary  Jose  Dima 
Dima Satria, S.H., M.Kn. Satria, S.H., M.Kn. 
     
WTR  menambah  penyertaan  pada  CSJ  sebesar     WTR increased its investment in CSJ amounted to  
Rp  7.031.843.000,  berdasarkan  Surat  Permintaan  Rp 7,031,843,000, based on the Letter for request 
Setoran Modal Perseroan tanggal 6 Juli 2015. of Capital Subscription dated July 6, 2015.
     
WTR  menambah  penyertaan  melalui  konversi  utang    WTR  increased  its  investment  through  a 
pada  CSJ  sebesar  Rp  11.513.843.037,  berdasarkan  conversion  of  debt  in  CSJ  amounted  to  
Berita  Acara  Utang-Piutang  Antara  PT Jasa  Marga  Rp  11,513,843,037,  based  on  the  Minutes  of 
(Persero)  Tbk,  WTR,  PT  Jakarta  Propertindo  dan  CSJ  Meeting  between  PT  Jasa  Marga  (Persero)  Tbk, 
tanggal 31 Juli 2015.  WTR,  PT Jakarta  Propertindo  and  CSJ  dated July 
31, 2015. 
     
WTR  menambah  penyertaan  berdasarkan  Akta    WTR  increased  its  investment  based  on             
No.  18  dari  Notaris  Ashoya  Ratam,  S.H.,  M.Kn.,  the  notarial  deed  No.  18  by  Ashoya  Ratam,  S.H., 
tanggal  22  Nopember  2018  pada  CSJ  sebesar         M.Kn. dated November 22, 2018 in CSJ amounted 
Rp 18.536.700.000.  to Rp 18,536,700,000. 

89
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
WTR  menambah  penyertaan  berdasarkan  Akta    WTR  increased  its  investment  based  on                     
No.  7  dari  Notaris  Ashoya  Ratam,  S.H.,  M.Kn.,  the  notarial  deed  No.  7  by  Ashoya  Ratam,  S.H., 
tanggal  5  September  2019  pada  CSJ  sehingga  M.Kn.  dated  September  5,  2019  in  CSJ,  
kepemilikan menjadi sebesar Rp 191.533.669.600.  the ownership increased to Rp 191,533,669,600. 
     
PT Jasamarga Semarang Batang (JMSB)    PT Jasamarga Semarang Batang (JMSB) 
     
WTR,  entitas  anak,  memiliki  penyertaan  sebesar  40%    WTR,  a  subsidiary,  has  investment  of  40%  in 
pada  JMSB  atau  setara  Rp  53.458.400.000  JMSB  ini  JMSB  or  equivalent  to  Rp  53,458,400,000.          
didirikan sesuai Akta Pendirian No. 128 tanggal 21 April  JMSB  was  established  under the  Notarial  deed  of 
2016 dari Notaris Haji Rizul Sudarmadi, S.H., bergerak  Establishment  No.  128,  dated  April  21,  2016  of 
di bidang jalan tol.   Notary Haji Rizul Sudarmadi, S.H., engaged in toll 
road sector. 
     
WTR  menambah  penyertaan  berdasarkan  Akta    WTR  increased  its  investment  based  on     
No.  13  dari  Notaris  Endang  Sri  Handayani  Soekarmo,  the notarial deed No. 13 by Endang Sri Handayani 
S.H., Sp. N., MH, tanggal 24 Oktober 2018 pada JMSB  Soekarmo,  S.H.,  Sp.N.,  MH,  dated  October  24, 
sebesar Rp 14.671.800.000.  2018 in JMSB amounted to Rp 14,671,800,000. 
     
WTR  menambah  penyertaan  berdasarkan  Akta    WTR  increased  its  investment  based  on  
No.  103  dari  Notaris  Prof.  Dr.  Liliana  Tedjosaputro,  the  notarial  deed  No.  103  by  Prof.  Dr.  Liliana 
SH.,  MH.,  MM,  tanggal  26  Desember  2018  pada  Tedjosaputro, SH., MH., MM, dated December 26, 
JMSB sebesar Rp 1.257.335.760.000.  2018 in JMSB amounted to Rp 1,257,335,760,000. 
     
PT Hutama Marga Waskita (HMW)    PT Hutama Marga Waskita (HMW) 
     
WTR,  entitas  anak,  memiliki  penyertaan  sebesar  30%    WTR,  a  subsidiary,  owns  investments  of  30%  in 
dari  modal  HMW  atau  sebesar  Rp  4.500.000.000.  HMW  or  amounted  to  Rp  4,500,000,000.  HMW 
HMW  didirikan  sesuai  Akta  Pendirian  No.  24  tanggal                  
was established based on the Notarial deed No. 24 
20  Pebruari  2017  dari  Notaris  Ni  Nyoman  Rai  dated February 20, 2017 of Notary Ni Nyoman Rai 
Sumawati,  S.H.,  M.Kn,  bergerak  di  bidang  Sumawati,  S.H.,  M.Kn  and  engaged  in  toll  road 
pengusahaan jalan tol. concession.
     
WTR  menambah  penyertaan  pada  HMW  sebesar     WTR  increased  its  investment  in  HMW  amounted 
Rp  22.800.000.000  berdasarkan  Keputusan  Sirkular  to  Rp  22,800,000,000,  based  on  the  decree  of               
RUPS  tanggal  24  Mei  2018  berdasarkan  Akta  No.  13  the Circular of GMS dated May 24, 2018, based on     
dari  Notaris  Ni  Nyoman  Rai  Sumawati,  S.H.,  M.Kn.,  the  notarial  deed  No.  13  by  Ni  Nyoman  Rai 
tanggal 8 Juni 2018.  Sumawati, S.H., M.Kn., dated June 8, 2018 
     
PT Hotel Karya Indonesia (HKI)    PT Hotel Karya Indonesia (HKI) 
     
Pendirian  PT  Hotel  Karya  Indonesia  (Entitas  Asosiasi    The  establishment  of  PT  Hotel  Karya  Indonesia 
WKR)  adalah  sesuai  dengan  akta  notaris  Cintya  Ayu  (WKR  Association  Entity)  was  in  accordance  with 
Rashanty,  S.H.,  M.Kn.,  No.  10  tanggal  29  Oktober  the  notary  deed  of  Cintya  Ayu  Rashanty,  S.H., 
2018.  Akta  ini  telah  mendapat  pengesahan  Menteri  M.Kn.,  No.  10  dated  October  29,  2018.  
Hukum dan Hak Asasi Manusia dalam surat keputusan   This  deed  has  been  approved  by  the  Minister  
No.  AHU-0053574.AH.01.01  Tahun  2018  tanggal   of  Law  and  Human  Rights  in  the  decree  
9 Nopember 2018.  No.  AHU-0053574.AH.01.01 2018  date  November 
9, 2018. 
 
Berdasarkan  akta  notaris  Cintya  Ayu  Rishanty,  S.H.,    Based  on  notary  deed  of  Cintya  Ayu  Rishanty, 
M.Kn.,  No.  15  tanggal  28  Januari  2019,  Grup  memiliki  S.H.,  No.  15  dated  January  28,  2019,  Group  
penyertaan di HKI sebesar Rp 15.525.000.000, Akta ini  has  investment  in  HKI  amounted  to  
telah  mendapat  pengesahan  Mentri  Hukum  dan  Hak  Rp  15,525,000,000,  this  deed  has  been  approved 
Asasi  Manusia  sesuai  dengan  Surat  Keputusan   by  the  Minister  of  Law  and  Human  Rights  in  
No.  AHU-0017985.AH.01.11.Tahun  2019  tanggal   the  decree  No.  AHU-0017985.AH.01.11.Tahun 
4 Pebruari 2019. 2019 dated February 4, 2019.
 
PT Waskita Bali Mandara (WBM)    PT Waskita Bali Mandara (WBM) 
     
WTR,  entitas  anak,  memiliki  penyertaan  sebesar  60%    WTR,  a  subsidiary,  has  investments  of  60%  in  
pada WBM. WBM didirikan sesuai Akta Pendirian No. 6  WBM.  WBM  was  established  under  the  Deed  of 
tanggal  13  Nopember  2015  dari  Notaris  Jose  Dima  Establishment  No.  6  dated  November  13,  2015  of 

90
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Satria,  S.H.,  M.Kn.  WBM  belum  memiliki  hak  Notary Jose Dima Satria, S.H., M.Kn. WBM has no 
pengusahaan jalan tol.  toll road concession right. 
     
Investasi pada Ventura Bersama    Investment in Joint Ventures 
     
Rincian  saldo  investasi  ventura  bersama  adalah    Details  of  investment  in  joint  ventures  are  as 
sebagai berikut:  follows: 
 
30 September/ September 30, 2019
Setoran (Penarikan)/ Pengakuan Laba
Koreksi/ Placement (Rugi)/
Persentase/ Saldo Awal/ (Withdrawal)/ Gain (Loss) Saldo Akhir/
Proyek/ Project Percentage Beginning Balance Correction Recognition Ending Balance
% Rp Rp Rp Rp
Pihak Berelasi/ Related Parties
WKR - RNI RNI Office Park 96% 271.858.055.348  9.197.606.274  6.303.888.659  287.359.550.281 
Waskita - Adhi Bendungan Way Sekampung (Paket 2) 63% 46.223.592.286  (10.625.000.001) 22.475.170.241  58.073.762.527 
Brantas - Waskita Bendungan Tapin 49% 46.567.110.869  --  7.862.226.190  54.429.337.059 
Waskita - Adhi Bendungan Leuwi Keris Paket 2 70% 24.323.305.835  (7.000.000.000) 26.882.151.883  44.205.457.718 
Waskita - NK  Jalan Batu Aji Kuaro 60% 38.473.287.580  --  --  38.473.287.580 
Waskita - Wika Jalan Tol Ciawi Sukabumi seksi 1 51% 17.958.302.777  --  5.166.072  17.963.468.849 
Waskita - HK - Wika  Bandara Samarinda 43% 18.633.386.670  (6.374.999.998) 175.283.759  12.433.670.431 
Waskita - Yodya Karya Bandara Husein 99% 7.849.919.710  --  --  7.849.919.710 
Waskita - Wika - PP - HK Jatigede Sumedang 25% 7.448.173.986  --  --  7.448.173.986 
Waskita - HK  Sal Induk Sidorejo 51% 7.348.709.249  --  --  7.348.709.249 
Waskita - PP Kamijoro 51% 6.163.904.085  --  (485.360.744) 5.678.543.341 
Wika - Waskita - Nindya Soker MYC 31% 5.219.907.025  (18.312.774) 391.579  5.201.985.830 
Waskita - PP - Wika Jembatan Merah Putih  34% 4.490.658.282  (308.780.372) (86.246) 4.181.791.664 
Waskita - Adhi Pengaman Pantai Jakarta Tahap 2 Paket 1 60% 5.311.603.777  (1.372.920.124) 22.792.826  3.961.476.479 
Waskita - HK  Normalisasi Kali Ciliwung - Cisadane 51% 2.025.915.319  --  --  2.025.915.319 
HK - Waskita Manado - Bitung (Air Madidi) 45% 6.895.497.144  (5.995.497.144) 159.494.623  1.059.494.623 
Wika - Waskita RSUD Pasar Minggu 40% 271.701.933  --  --  271.701.933 
Waskita - PP - HK Jalan Tol Depok - Antasari Paket 1 34% --  241.478.820  --  241.478.820 
Waskita - Adhi Bendungan Margatiga 65% 1.187.840.629  --  3.396.471.835  4.584.312.464 
Waskita - Wika - PP - HK - Adhi Optimalisasi Properti PT Asuransi Jiwasraya 20% 280.000.000.000  (280.000.000.000) --  -- 
Waskita - Brantas - Wika Bendung Gerak Sembayat 33% 21.157.453.141  (21.157.453.141) --  -- 
PP - Waskita Jalan Tol Solo - Kertosono Paket 03 Seksi 4 43% 195.911.276  (195.911.276) --  -- 
Waskita - Wika Irigasi Batang Sinamar  60% --  675.083.905  (675.083.905) -- 
Sub Jumlah/ Sub Total 819.604.236.921 (322.934.705.831) 66.122.506.772 562.792.037.862

Pihak Ketiga/ Third Parties


WKR - Asiana Two Senopati 51% 348.768.620.995  (10.000.000.000) --  338.768.620.995 
WKR - Darmo Permai Segi 88 Avenue 51% 327.680.205.750  49.929.548.507  5.159.068.519  382.768.822.776 
Waskita - Acset Jalanlayang Cikampek   51% 50.121.782.501  146.639.463.873  99.235.736.961  295.996.983.335 
Waskita - Triniti Alam Sutra 51% 165.947.378.561  --  (160.331.736) 165.787.046.825 
WKR - Sirius Yukata Suites 51% 125.184.298.658  --  (718.230.514) 124.466.068.144 
Waskita - JPC SMM Muara Teweh Div.Sipil 68% 65.018.045.240  --  36.506.943.261  101.524.988.501 
Waskita - Gorip Nanda Guna Jl. Gempor Paket 2 Porong-Kejapan  60% 93.911.750.710  --  357.023.970  94.268.774.680 
Waskita - Wika - PP - Jaya  Gd. Terminal 3  45% 83.416.838.379  (10.654.228.361) --  72.762.610.018 
Dalawa - WKR Zallaka - Batu Tumpeng 41% 64.557.379.965  --  --  64.557.379.965 
Waskita - Yasa Jl. Galing Aruk 100% 39.303.948.460  --  --  39.303.948.460 
Waskita - Arkonin Revitalisasi TPA Regional Sarbagita Suwing (MYC) 92% 26.313.919.410  --  9.462.796.134  35.776.715.544 
Metallurgical - Wika - NK - Waskita Jl Tol Cisumdawu Phase 2 8% 17.101.128.564  (3.162.427.176) 22.145.893.703  36.084.595.091 
Waskita - Abdi Mulia Berkah Sal Primer Jabung II 70% 29.644.945.006  --  (1.180.779.379) 28.464.165.627 
Waskita - Bawakaraeng Irigasi D.I. Batang Alai 70% 27.376.594.088  --  (213.459.400) 27.163.134.688 
Waskita - Citra Mandiri Jaringan Irigasi D.I Air Lakitan    70% 21.751.637.715  --  4.723.035.578  26.474.673.293 
Waskita - Bahagia Bangun Nusa Bendungan Temef (Paket 1) 78% 7.486.166.199  --  30.077.371.998  37.563.538.197 
Waskita - Penta Lansekap Bandara Soetta 98% 15.893.747.018  --  --  15.893.747.018 
Waskita - Taruna Putra Pertiwi Jaringan Irigasi D.I Colo (MYC) 70% 15.310.394.263  --  (65.307.175) 15.245.087.088 
Daelim - Wika - Waskita Karian Multipurpose Dam Project 22% 12.253.623.774  --  5.188.739.043  17.442.362.817 
Waskita - Surya Bakti Jalan Pendekat Mahakam IV Sisi Samarinda Kota (MYC) 60% 14.131.774.066  (4.800.000.000) 80.855.411  9.412.629.477 
Waskita - Baswara - Mahir Jaya Tulur Aji Jangkat 100% 5.805.911.452  --  --  5.805.911.452 
Waskita - Wika - Shanghai Jl Tol Cisumdawu Phase 1 10% 6.476.285.827  (2.861.394.728) --  3.614.891.099 
Waskita - Cempaka Bendung Baliase 55% 9.340.722.770  (6.049.999.997) (104.515.793) 3.186.206.980 
WKR - Ekatama Apartemen Pejaten 60% 17.227.981.203  (17.300.000.000) 364.419.805  292.401.008 
WBP - Jakon Normalisasi Turap Pasar Lama 60% 14.464.881.275  (14.464.881.275) --  -- 
Waskita - Basuki Rahmana Putra Dredging & Embankmen of Grogol 60% 21.328.737.599  (21.328.737.599) --  -- 
Waskita - Feberco PLN Curup Bengkulu 60% --  156.922.495  (156.922.495) -- 
Waskita - Jakon - Sagna Bendungan Tiga Dihaji 57% --  1.803.709.688  (1.803.709.688) -- 
Waskita - PAL PLTU 2X3 MW Malinau 100% 15.399.078.118  67.749.736.121  (83.148.814.239) -- 
Sub Jumlah/ Sub Total 1.641.217.777.566 175.657.711.548 125.749.813.964 1.942.625.303.078
Jumlah/ Total 2.460.822.014.487 (147.276.994.283) 191.872.320.736 2.505.417.340.940

91
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
31 Desember/ December 31, 2018
Setoran (Penarikan)/ Pengakuan Laba
Koreksi/ Placement (Rugi)/
Persentase/ Saldo Awal/ (Withdrawal)/ Gain (Loss) Saldo Akhir/
Proyek/ Project Percentage Beginning Balance Correction Recognition Ending Balance
% Rp Rp Rp Rp
Pihak Berelasi/ Related Parties
Waskita - Wika - PP - HK - Adhi Optimalisasi Properti PT Asuransi Jiwasraya 20% --  280.000.000.000  --  280.000.000.000 
WKR - RNI RNI Office Park 96% 110.030.046.349  59.069.559.628  102.758.449.371  271.858.055.348 
Brantas - Waskita Bendungan Tapin 49% 19.791.335.183  884.774.508  25.891.001.178  46.567.110.869 
Waskita - Adhi Bendungan Way Sekampung (Paket 2) 63% 7.790.337.543  10.433.487.250  27.999.767.493  46.223.592.286 
Waskita - NK  Jalan Batu Aji Kuaro 60% 38.473.221.509  --  66.071  38.473.287.580 
Waskita - Adhi Bendungan Leuwi Keris Paket 2 70% 7.071.255.489  (4.200.000.000) 21.452.050.346  24.323.305.835 
Waskita - Brantas - Wika Bendung Gerak Sembayat 33% 21.157.753.141  --  (300.000) 21.157.453.141 
Waskita - HK - Wika  Bandara Samarinda 43% 27.981.051.600  (6.375.000.000) (2.972.664.930) 18.633.386.670 
Waskita - Wika Jalan Tol Ciawi Sukabumi seksi 1 51% 15.063.632.277  --  2.894.670.500  17.958.302.777 
Waskita - Yodya Karya Bandara Husein 99% 10.487.155.978  --  (2.637.236.268) 7.849.919.710 
Waskita - Wika - PP - HK Jatigede Sumedang 25% 7.448.173.986  --  --  7.448.173.986 
Waskita - HK  Sal Induk Sidorejo 51% 7.333.792.903  --  14.916.346  7.348.709.249 
HK - Waskita Manado - Bitung (Air Madidi) 45% 3.080.745.497  (8.480.745.497) 12.295.497.144  6.895.497.144 
Waskita - PP Kamijoro 51% 4.583.424.384  --  1.580.479.701  6.163.904.085 
Waskita - Adhi Pengaman Pantai Jakarta Tahap 2 Paket 1 60% 12.493.401.691  (11.147.939.067) 3.966.141.153  5.311.603.777 
Wika - Waskita - Nindya Soker MYC 31% 9.045.838.634  (5.069.244.383) 1.243.312.774  5.219.907.025 
Waskita - PP - Wika Jembatan Merah Putih  34% 14.326.978.866  (9.327.170.880) (509.149.704) 4.490.658.282 
Waskita - HK  Normalisasi Kali Ciliwung - Cisadane 51% 2.442.563.467  (1.275.000.000) 858.351.852  2.025.915.319 
Waskita - Adhi Bendungan Margatiga 65% --  --  1.187.840.629  1.187.840.629 
Wika - Waskita RSUD Pasar Minggu 40% 271.701.933  --  --  271.701.933 
PP - Waskita Jalan Tol Solo - Kertosono Paket 03 Seksi 4 43% 195.911.276  --  --  195.911.276 
Waskita - PP - HK Jalan Tol Depok - Antasari Paket 1 34% --  (2.107.189.324) 2.107.189.324  -- 
WKR - KAI TOD Stasiun Bogor 100% 595.740.798  (595.740.798) --  -- 
Waskita - Wika Irigasi Batang Sinamar  60% --  4.275.954.926  (4.275.954.926) -- 
Sub Jumlah/ Sub Total 319.664.062.504 306.085.746.363 193.854.428.054 819.604.236.921

Pihak Ketiga/ Third Parties


WKR - Asiana Two Senopati 51% 347.044.038.112  1.722.951.340  1.631.543  348.768.620.995 
WKR - Darmo Permai Segi 88 Avenue 51% 305.480.096.911  75.486.587  22.124.622.252  327.680.205.750 
Waskita - Triniti Alam Sutra 51% 166.445.845.638  --  (498.467.077) 165.947.378.561 
WKR - Sirius Yukata Suites 51% 74.963.296.361  29.880.580.519  20.340.421.778  125.184.298.658 
Waskita - Gorip Nanda Guna Jl. Gempor Paket 2 Porong-Kejapan  60% 22.712.846.382  --  71.198.904.328  93.911.750.710 
Waskita - Wika - PP - Jaya  Gd. Terminal 3  45% 87.132.922.037  (3.770.143.171) 54.059.513  83.416.838.379 
Waskita - JPC SMM Muara Teweh Div.Sipil 68% 65.018.045.240  --  --  65.018.045.240 
Dalawa - WKR Zallaka - Batu Tumpeng 41% 203.446.276.931  (138.886.349.119) (2.547.847) 64.557.379.965 
Waskita - Acset Jalanlayang Cikampek   51% --  246.776.291.298  (196.654.508.797) 50.121.782.501 
Waskita - Yasa Jl. Galing Aruk 100% 35.323.129.793  --  3.980.818.667  39.303.948.460 
Waskita - Abdi Mulia Berkah Sal Primer Jabung II 70% 10.789.801.243  --  18.855.143.763  29.644.945.006 
Waskita - Bawakaraeng Irigasi D.I. Batang Alai 70% 18.373.631.754  --  9.002.962.334  27.376.594.088 
Waskita - Arkonin Revitalisasi TPA Regional Sarbagita Suwing (MYC) 92% --  --  26.313.919.410  26.313.919.410 
Waskita - Citra Mandiri Jaringan Irigasi D.I Air Lakitan    70% 6.355.161.579  --  15.396.476.136  21.751.637.715 
Waskita - Basuki Rahmana Putra Dredging & Embankmen of Grogol 60% 21.328.737.599  --  --  21.328.737.599 
WKR - Ekatama Apartemen Pejaten 60% 29.390.315.730  (12.162.334.527) --  17.227.981.203 
Metallurgical - Wika - NK - Waskita Jl Tol Cisumdawu Phase 2 8% 5.264.440.264  --  11.836.688.300  17.101.128.564 
Waskita - Penta Lansekap Bandara Soetta 98% 15.893.747.018  --  --  15.893.747.018 
Waskita - PAL PLTU 2X3 MW Malinau 100% --  --  15.399.078.118  15.399.078.118 
Waskita - Taruna Putra Pertiwi Jaringan Irigasi D.I Colo (MYC) 70% 7.847.495.378  --  7.462.898.885  15.310.394.263 
WBP - Jakon Normalisasi Turap Pasar Lama 60% 14.464.881.275  --  --  14.464.881.275 
Waskita - Surya Bakti Jalan Pendekat Mahakam IV Sisi Samarinda Kota (MYC) 60% 11.783.943.613  (900.000.000) 3.247.830.453  14.131.774.066 
Daelim - Wika - Waskita Karian Multipurpose Dam Project 22% 11.877.903.223  --  375.720.551  12.253.623.774 
Waskita - Cempaka Bendung Baliase 55% 12.938.472.867  (4.856.834.059) 1.259.083.963  9.340.722.770 
Waskita - Bahagia Bangun Nusa Bendungan Temef (Paket 1) 78% --  --  7.486.166.199  7.486.166.199 
Waskita - Wika - Shanghai Jl Tol Cisumdawu Phase 1 10% 7.726.808.199  --  (1.250.522.372) 6.476.285.827 
Waskita - Baswara - Mahir Jaya Tulur Aji Jangkat 100% 5.805.911.452  --  --  5.805.911.452 
Waskita - Andesmont Kebayakan - Sp.Kraft Roads 60% --  18.400.488.777  (18.400.488.777) -- 
Waskita - Modern Dermaga Peti Kemas (CY-01) 60% 684.494.719  (684.494.719) --  -- 
Waskita - Kajima E2 Cilincing-Cijampea 40% --  (8.794.848.453) 8.794.848.453  -- 
Sub Jumlah/ Sub Total 1.488.092.243.320 126.800.794.473 26.324.739.775 1.641.217.777.566
Jumlah/ Total 1.807.756.305.824 432.886.540.836 220.179.167.829 2.460.822.014.487

 
 
 
 
 

92
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
 
Tidak  terdapat  perubahan  kepemilikan  atau  hak  suara  There  has  been  no  change  in  the  Group's 
Grup untuk tahun-tahun yang dilaporkan.  ownership  or  voting  interests  in  these  joint 
ventures for the reported years. 
 
Operasi bersama  Joint Operation 
   
Perusahaan  mempunyai  15%  bagian  dalam  Perjanjian  The Company has a 15% share in the Consortium 
Pembentukan Konsorsium dalam Rangka Pelaksanaan  Agreement  for  the  Construction  of  Multipurpose 
Pekerjaan  Pembangunan  Terminal  Multipurpose  dan  Port  and  Support  Facilities  at  the  Port  of  Kuala 
Fasilitas  Pendukung  di  Pelabuhan  Kuala  Tanjung   Tanjung  in  North  Sumatera  Province.    
di  Propinsi  Sumatera  Utara.  Perusahaan  berhak  atas  The  Company  is  entitled  to  a  proportionate  share 
proporsi  bagian  dari  penghasilan  dan  dikenakan  of  the  income  and  bears  a  proportionate  share  of 
proporsi bagian dari biaya operasi bersama.  the joint operating expenses. 
   
Perusahaan  mempunyai  bagian  dalam  perjanjian  The  Company  have  shares  in  the  joint  operation 
pelaksanaan  pekerjaan  pembangunan  Jalan  Tol  for  the  construction  work  of  Jakarta  Cikampek  II 
Jakarta  Cikampek  II  Elevated  ruas  Cikunir  s.d  Toll Road Elevated Cikunir to West Karawang sta 
Karawang Barat sta 9+500 - sta 28+480 (Catatan 55).  9 + 500 - sta 28 + 480 (Note 55). 
   
14. PROPERTI INVESTASI   14. INVESTMENT PROPERTIES 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Harga Perolehan Acquisition Cost
Tanah 28.196.842.480  28.196.842.480  Land
Bangunan 79.558.646.607  79.558.646.607  Building
Jumlah Harga Perolehan 107.755.489.087 107.755.489.087 Total Acquisition Cost

Nilai Wajar Fair Value
Tanah 42.571.862.492  42.571.862.492  Land
Bangunan 83.707.542.197  83.707.542.197  Building
Total Nilai Wajar 126.279.404.689  126.279.404.689  Total Fair Value
Jumlah Properti Investasi 126.279.404.689 126.279.404.689 Total Investment Properties

   

Properti  investasi  merupakan  proyek  gedung    Investment properties consist of office building and 


perkantoran dan hotel Cawang dalam pengembangan,  Cawang  hotel  project  under  development,  located 
yang  berlokasi  di  Jalan  MT  Haryono  Cawang,  dengan  in Jalan MT Haryono Cawang, lying on a land area 
luas lahan sebesar 3.650m2.  of 3,650sqm. 
     
Properti  investasi  milik  Perusahaan  merupakan  Hotel    Company’s  Investment  Properties  includes  Hotel 
Dafam  Teraskita  yang  berlokasi  di  Jakarta.  Yang  Dafam  Teraskita,  located  in  Jakarta.  The  part  of 
menjadi  bagian  dari  properti  investasi  adalah  bagian  Dafam Teraskita that is categorized as investment 
yang  disewakan  untuk  dijadikan  perkantoran.  Pada   property is the office segment of the building. As of 
30  September  2019,  terdapat  penambahan  properti  September  30,  2019,  there  is  an  addition  in 
investasi yang merupakan penambahan dari konstruksi  investment  property  coming  from  the  construction 
dalam penyelesaian Hotel Dafam Teraskita di Bandung  completion  of  Hotel  Dafam  Teraskita  in  Bandung 
dan  Makassar  dan  reklasifikasi  atas  properti  investasi  and  Makassar  and  reclasification  from  investment 
sebesar  Rp  28.413.452.717  ke  aset  lain-lain  (Catatan  property  amounted  to  Rp  28,413,452,717  to  other 
18).  assets (Note 18). 
     
Pada  tanggal  30  September  2019  dan  31  Desember    As  of  September  30,  2019  and  December  31, 
2018  nilai  wajar  properti  investasi  adalah  masing- 2018,  the  fair  value  of  the  investment  properties 
masing  sebesar  Rp  126.279.404.689  dan   amounted  to  Rp  126,279,404,689  and  
Rp  126.279.404.689.  Nilai  Wajar  pada  31  Desember  Rp  126,279,404,689.  The  fair  value  as  of 
2018  didasarkan  pada  laporan  penilaian  dari  KJPP  December  31,  2018  derived  from  the  valuation 
Toha,  Okky,  Heru  &  Rekan,  penilai  independen.  report  of  KJPP  Toha,  Okky,  Heru,  &  Rekan, 
Pendekatan  penilaian  nilai  wajar  yang  digunakan  oleh  independent  valuers.  The  approach  valuation  of 
KJPP  adalah  metode  pendekatan  biaya  dan  fair  value  that  useb  by  KJPP  are  cost  approach 
pendekatan pendapatan.   and revenue approach method.  
   
 
 
 

93
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
15. INVESTASI JANGKA PANJANG LAINNYA   15. OTHER LONG-TERM INVESTMENTS 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

PT Prima Multi Terminal 302.622.000.000  302.622.000.000 


PT Citra Karya Jabar Tol 45.000.000.000  45.000.000.000 
PT PP Sinergi Banjaratma 12.684.923.000  -- 
PT Jasamarga Probolinggo Banyuwangi 200.000.000  200.000.000 
Jumlah/ Total 360.506.923.000 347.822.000.000

 
Rincian  mutasi  investasi  jangka  panjang  lainnya    The  detail  of  mutation  of  other  long-term 
sebagai berikut: investment are as follows: 
     
30 Sptember/ September 30 , 2019
Persentase
Kepemilikan/ Penambahan
Percentage of Saldo Awal/ (Pengurangan)/ Saldo Akhir/
Ownership Beginning Balance Addition (Deduction) Ending Balance
% Rp Rp Rp

PT Prima Multi Terminal 20,00% 302.622.000.000  --  302.622.000.000 


PT Citra Karya Jabar Tol 15,00% 45.000.000.000  --  45.000.000.000 
PT PP Sinergi Banjaratma 20,00% --  12.684.923.000  12.684.923.000 
PT Jasamarga Probolinggo Banyuwangi 0,34% 200.000.000  --  200.000.000 
Jumlah/ Total 347.822.000.000 12.684.923.000 360.506.923.000
 
31 Desember/ December 31 , 2018
Persentase
Kepemilikan/ Penambahan
Percentage of Saldo Awal/ (Pengurangan)/ Saldo Akhir/
Ownership Beginning Balance Addition (Deduction) Ending Balance
% Rp Rp Rp

PT Prima Multi Terminal 20,00% 272.622.000.000  30.000.000.000  302.622.000.000 


PT Citra Karya Jabar Tol 15,00% 15.000.000.000  30.000.000.000  45.000.000.000 
PT Jasamarga Probolinggo Banyuwangi 0,34% --  200.000.000  200.000.000 
Jumlah/ Total 287.622.000.000 60.200.000.000 347.822.000.000
 
PT Prima Multi Terminal (PMT)   PT Prima Multi Terminal (PMT)
 
Perusahaan  memiliki  penyertaan  sebesar  20%  pada    The  Company  has investments  of  20% in  PMT  or 
PMT  atau  setara  Rp  26.100.000.000.  Perusahaan  ini  equivalent  to  Rp  26,100,000,000.  The  Company 
didirikan  sesuai  Akta  Pendirian  No.  4  tanggal  was  established  under  the  Notarial  deed  of 
26 September  2014  dari  Notaris  Tuti  Sumarni,  S.H.,  Establishment No. 4 dated September 26, 2014 of 
MH, bergerak di bidang perdagangan dan jasa. Notary Tuti Sumarni, S.H., MH, engaged in trading 
and services.
 
Berdasarkan  Akta  No.  6  tanggal  16  Desember  2015    Based on Notarial deed No. 6 dated December 16, 
dari  notaris  Tuti  Sumarni,  S.H.,  M.H.,  PT  Perumahan  2015  of  notary  Tuti  Sumarni,  S.H.,  M.H., 
Pembangunan  Tbk  melakukan  penjualan  sebagian  PT Perumahan  Pembangunan  Tbk  sold  some  of 
saham  sebanyak  5%  yang  dimiliki  di  dalam  PMT  atau  its  own  shares  on  PMT  amounted  to  5%  or 
sebesar Rp 9.150.000.000.  equivalent to Rp 9,150,000,000. 
     
Pada  tanggal  14  Desember  2017,  Perusahaan    On  December  14,  2017,  the  Company  
menambah  penyertaan  di  PMT  sebesar  added  investment  in  PMT  amounted  to  
Rp 60.000.000.000.  Kepemilikan  Perusahaan  menjadi  Rp  60,000,000,000.  Resulting  in  the  increase  of 
sebesar  20%,  berdasarkan  akta  notaris  No.  9  tanggal  the  Company’s  ownership  becoming  20% 
23 Pebruari 2018 dari notaris Risna Rahmi Arifa, S.H.   according  to  notarial  deed  No.  9  dated  February 
23, 2018 of noatry Risna Rahmi Arifa, S.H.  

Pada  Desember  2018,  Perusahaan  menambah    On  December,  2018,  the  Company  
penyertaan  di  PMT  sebesar  Rp 30.000.000.000.  added  investments  in  PMT  amounted  to  
Kepemilikan  Perusahaan  menjadi  sebesar  20%,  Rp  30,000,000,000.  Resulting  in  the  increase  of  
berdasarkan akta notaris No. 13 tanggal 18 Maret 2019  the  Company’s  ownership  becoming  20% 
dari  notaris  Risna  Rahmi  Arifa,  S.H.  Manajemen  according to notarial deed No. 13 dated March 18, 

94
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
berpendapat  penyertaan  di  PMT  belum  memiliki  2019  of  noatry  Risna  Rahmi  Arifa,  S.H.  
pengaruh signifikan sampai dengan tanggal pelaporan.   The  management  has  assessed  that  ownership in 
PMT  does  not  have  significant  influence  up  to 
reporting date. 
     
PT Citra Karya Jabar Tol (CKT) PT Citra Karya Jabar Tol (CKT)
     
WTR  memiliki  penyertaan  sebesar  15%  dari  modal  WTR  owns  investment  equivalent  to  15%  of  
CKT  atau  sebesar  Rp  15.000.000.000.  CKT  didirikan  CKT  paid  in  capital  or  amounted  to 
sesuai  Akta  Pendirian  No.  18  tanggal  30  Januari  2017  Rp 15,000,000,000.  CKT  was  established  based 
dari  notaris  Dessi,  S.H.,  M.Kn.,  bergerak  di  bidang  on  the  notarial  deed  No.  18  dated  January  30, 
pengusahaan jalan tol.  2017 by notary Dessi, S.H., M.Kn. and engaged in 
toll road concession. 
     
WTR  menambah  penyertaan  pada  CKT  sebesar                  WTR  increased  its  investment  in  CKT  amounted 
Rp 30.000.000.000 pada tanggal 1 Nopember 2018. to Rp 30,000,000,000 on November 1, 2018.
 
PT PP Sinergi Banjaratma   PT PP Sinergi Banjaratma
     
Perusahaan  memiliki  penyertaan  sebesar  20%  pada     The  Company  has  investments  of  20%  in  
PT  PP  Sinergi  Banjaratma  atau  setara   PT  PP  Sinergi  Banjaratma  or  equivalent  to  
Rp  12.684.923.000.  Perusahaan  ini  didirikan  sesuai  Rp  12,684,923,000.  The  Company  was 
Akta  Pendirian  No.  2  tanggal  7  Pebruari  2019  dari  established  under  the  Notarial  deed  of 
Notaris Ni Nyoman Rai Sumawati, S.H., M.Kn. Establishment  No.  2  dated  February  7,  2019  of 
Notary Ni Nyoman Rai Sumawati, S.H., M.Kn.
 
PT Jasamarga Probolinggo Banyuwangi (JPB)   PT Jasamarga Probolinggo Banyuwangi (JPB)
     
WTR,  entitas  anak,  memiliki  penyertaan  sebesar  40%    WTR, a subsidiary, has investment of 40% in JPB 
pada  JPB  setara  Rp  200.000.000,  berdasarkan  Akta  or  equivalent  to  Rp  200,000,000,  based  on          
notaris  No.  21  tanggal  29 Desember  2017  dari  Notaris  the  Notarial  deed  No. 21  dated  December  29, 
Ni Nyoman Rai Sumawati, SH., M.Kn.   2017  of  Notary  Ni  Nyoman  Rai  Sumawati,  SH., 
M.Kn.  
     
Berdasarkan  akta  berita  acara  RUPS  Notaris    Based  on  GMS  Notary  Ni  Nyoman  Rai  Sumawati, 
Ni  Nyoman  Rai  Sumawati,  S.H.,  M.Kn.  No.  23  tanggal   S.H.,  M.Kn.  No.  23  dated  January  24,  2018  WTR 
24  Januari  2018,  kepemilikan  WTR  pada  JPB  menjadi  has ownership of JPB to 0,34%. 
0,34%. 
     
16. ASET TETAP – BERSIH   16. FIXED ASSETS – NET 
 
30 September/ September 30, 2019
Saldo Awal/ Penambahan/ Pengurangan/ Reklasifikasi/ Saldo Akhir/
Beginning Balance Addition Deduction Reclassification Ending Balance
Rp Rp Rp Rp Rp

Biaya Perolehan Acquisition Cost


Tanah 1.591.127.544.038  81.762.441.761  --  --  1.672.889.985.799  Land
Gedung 475.119.538.755  11.578.213.861  --  --  486.697.752.616  Building
Pabrik 547.538.529.005  --  --  --  547.538.529.005  Plant
Perlengkapan Kantor 67.878.540.223  10.095.341.853  --  --  77.973.882.076  Office Supplies
Peralatan Proyek 4.142.242.065.703  146.207.875.232  --  --  4.288.449.940.935  Project Equipments
Kendaraan 16.629.165.207  2.455.093.575  --  --  19.084.258.782  Vehicles
Jumlah 6.840.535.382.931 252.098.966.282 -- -- 7.092.634.349.213 Total
Aset dalam Pelaksanaan Assets in Progress
Gedung, Pabrik, dan Building, Plant
Peralatan Proyek 1.993.392.548.831  989.882.865.619  --  --  2.983.275.414.450  Project Equipments
Akumulasi Penyusutan Accumulated Depreciation
Gedung 103.577.847.944  11.941.587.663  --  --  115.519.435.607  Building
Pabrik 32.354.376.259  26.276.325.115  --  --  58.630.701.374  Plant
Perlengkapan Kantor 41.704.951.802  9.879.976.941  --  --  51.584.928.743  Office Supplies
Peralatan Proyek 1.552.098.071.484  346.837.270.536  --  --  1.898.935.342.020  Project Equipments
Kendaraan 13.071.524.630  1.727.648.645  --  --  14.799.173.275  Vehicles
Jumlah 1.742.806.772.119 396.662.808.900 -- -- 2.139.469.581.019 Total
Nilai Buku 7.091.121.159.643 7.936.440.182.644 Book Value

95
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
31 Desember/ December 31, 2018
Saldo Awal/ Penambahan/ Pengurangan/ Reklasifikasi/ Saldo Akhir/
Beginning Balance Addition Deduction Reclassification Ending Balance
Rp Rp Rp Rp Rp

Biaya Perolehan Acquisition Cost


Tanah 1.199.834.463.721  391.293.080.317  --  --  1.591.127.544.038  Land
Gedung 456.719.108.049  19.001.519.598  601.088.892  --  475.119.538.755  Building
Pabrik 410.688.510.558  136.850.018.447  --  --  547.538.529.005  Plant
Perlengkapan Kantor 56.712.381.644  16.188.533.126  5.022.374.547  --  67.878.540.223  Office Supplies
Peralatan Proyek 2.993.349.008.106  1.148.893.057.597  --  --  4.142.242.065.703  Project Equipments
Kendaraan 30.119.586.914  114.860.000  13.605.281.707  --  16.629.165.207  Vehicles
Jumlah 5.147.423.058.992 1.712.341.069.085 19.228.745.146 -- 6.840.535.382.931 Total
Aset dalam Pelaksanaan Assets in Progress
Gedung, Pabrik, dan Building, Plant
Peralatan Proyek 706.677.131.928  1.286.715.416.903  --  --  1.993.392.548.831  Project Equipments
Akumulasi Penyusutan Accumulated Depreciation
Gedung 93.963.227.763  9.641.132.500  26.512.319  --  103.577.847.944  Building
Pabrik 5.392.563.971  26.961.812.288  --  --  32.354.376.259  Plant
Perlengkapan Kantor 30.470.457.283  14.331.605.590  3.097.111.071  --  41.704.951.802  Office Supplies
Peralatan Proyek 965.967.174.368  586.130.897.116  --  --  1.552.098.071.484  Project Equipments
Kendaraan 16.018.637.174  549.509.552  3.496.622.096  --  13.071.524.630  Vehicles
Jumlah 1.111.812.060.559 637.614.957.046 6.620.245.486 -- 1.742.806.772.119 Total
Nilai Buku 4.742.288.130.361 7.091.121.159.643 Book Value

 
Aset  tetap,  berupa  tanah,  pabrik,  kendaraan  dan    Fixed  assets  in  the  form  of  land,  plants,  vehicles 
gedung  dijadikan  jaminan  atas  perolehan  kredit  dari  and buildings are used as collateral for bank loans. 
bank.  Sebagian  tanah  berikut  gedungnya                    
Some  land  and  buildings  above  are  used  as 
dijadikan  jaminan  kepada  PT  Bank  Mandiri  (Persero)  collaterals  to  PT  Bank  Mandiri  (Persero)  Tbk 
Tbk  (Catatan  22.1),  PT  Bank  Negara  Indonesia  (Note 22.1),  PT Bank  Negara  Indonesia  (Persero) 
(Persero)  Tbk  (Catatan 22.2),  Indonesia  Eximbank       Tbk  (Note  22.2),  Indonesia  Eximbank  (Note  22.5) 
(Catatan  22.5),  dan  PT  Bank  Rakyat  Indonesia  and  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk  
(Persero)  Tbk  (Catatan  22.3)  masing-masing                   (Note  22.3)  amounted  to  Rp 14,075,000,000,                   
sebesar  Rp  14.075.000.000,  Rp 109.135.230.000,             Rp  109,135,230,000,  Rp 5,153,000,000  and         
Rp  5.153.000.000,  dan  Rp 16.186.000.000,  dengan  Rp  16,186,000,000,  respectively,  with  a  total 
nilai  keseluruhan  Rp  253.698.792.958,  dan  nilai  wajar  amount of Rp 253,698,792,958, and the fair value 
tanah  dan  gedung  yang  dijaminkan  sebesar       of  the  lands  and  buildings  as  collateral  amounted 
Rp 201.353.690.000.000.  to Rp 201,353,690,000,000. 
     
Berdasarkan  penilaian  independen  KJPP  Toha,  Okky,    Based  on  revaluation  of  independent  appraisal 
Heru  dan  Rekan  nilai  wajar  aset  tanah  dan  bangunan  KJPP Toha, Okky, Heru dan Rekan, the fair value 
per  31  Desember  2018  adalah  sebesar                             
of  fixed  asset  on  land  and  buildings  as  of 
Rp  2.601.931.311.459,  sehingga  terdapat  selisih  December  31,  2018  amounted  to  
penilaian  aset  tetap  sebesar  Rp  266.706.285.292    dan  Rp 2,601,931,311,459, so there is a differences on 
perusahaan  mencatat  selisih  revaluasi  aset  tetap  revaluation  of  fixed  assets  amounted  to  
sebesar  Rp  242.948.717.891  pada  ekuitas  setelah  Rp  266,706,285,292  and  the  Company  has 
dikurangi dengan pajak.  recorded  the  differences  on  revaluation  of  fixed 
assets amounted to Rp 242,948,717,891 on equity 
after deducting tax. 
     
Pada tanggal 10 April 2018, Grup melepaskan sebagian    On April 10, 2018, the Group partially disposed of 
kepemilikan  di  WTTR,  sehingga  kepemilikan  Grup  its ownership in WTTR, so the Group's ownership   
menjadi  42,85%  dan  tidak  dikonsolidasi  oleh  Grup.  became    42.85%    and    was    not consolidated 
Sehingga  terdapat  penuruanan  pada  aset  tetap  pada  by  the  Group.  Therefore  there  is  a  reduction  in 
tanggal  31  Desember  2018  atas  transaksi  tersebut  fixed  assets  as  of  December  31,  2018  for  
dengan  nilai  perolehan  Rp  8.213.339.690  dengan  the  transaction  with  an  acquisition  value  of                
akumulasi  penyusutan  sebesar  Rp  6.620.245.486  Rp  8,213,339,690  with  accumulated  depreciation 
sehingga  nilai  buku  pengurangan  tersebut  sebesar           of  Rp  6,620,245,486  so  that  the  book  value  of                     
Rp 1.593.094.204.  the deduction is Rp 1,593,094,204. 
     

96
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Gedung,  pabrik  dan  peralatan  dalam  penyelesaian    The  buildings,  plants  and  equipments  under 
pada  30  September  2019  sebesar   construction  as of  September  30,  2019  amounted 
Rp  2.983.275.414.450  terutama  terdiri  dari  bangunan  to  Rp 3,020,797,211,972  mainly  consisted  of 
dalam  penyelesaian  dari  WKI,  entitas  anak,  sebesar   buildings  in  progress  belonging  to  WKI,  a 
Rp  58.305.976.025,  pabrik  beton  dalam  penyelesaian  subsidiary,  amounted  to  Rp 28,117,372,828, 
sebesar  Rp  1.989.531.516.619  dan  peralatan  dan  precast  plant  in  progress  amounted  to  
renovasi  gedung  Perusahaan  sebesar   Rp  1,602,342,628,857  and  the  Company’s 
Rp 935.437.921.806.  equipment  and  building  renovation  amounted  to 
Rp 935,437,921,806.  
     
Berikut  presentase  dan  estimasi  penyelesaian  aset    The  following  are  the  percentages  and  estimates 
dalam penyelesaian pada 30 September 2019:  of  the completion of  assets  under  construction on 
  September 30, 2019: 
 
Presentase dalam
Proyek/ Penyelesaian/ Estimasi Penyelesaian/
Project Percentage of Completion Estimated Completion

Pembangunan Plant Bojanegara 93,06% Akhir Desember/ End of December  2019


Pembangunan Plant Gasing 98,90% Akhir Janauri/ End of January  2020
Pembangunan Plant Klaten 100,00% Akhir Maret/ End of March  2019
Pembangunan Quarry Bojanegara 84,15% Akhir Desember/ End of December  2020
Pembangunan Quarry Lumbang 100,00% Akhir September/ End of September  2020
Pembangunan Litbang 100,00% Akhir September/ End of September  2020
Pembangunan Proyek Penajam 71,59% Akhir Januari/ End of January  2020
     
Gedung,  pabrik  dan  peralatan  dalam  penyelesaian    The  buildings,  plants  and  equipments  under 
pada  31  Desember  2018  sebesar       construction  as  of  December  31,  2018  amounted 
Rp  1.993.392.548.831  terutama  terdiri  dari  bangunan  to  Rp 1,993,392,548,831  mainly  consisted  of 
dalam  penyelesaian  dari  WKE,  entitas  anak,  sebesar  buildings  in  progress  belonging  to  WKE,  a 
Rp  2.541.333.521,  pabrik  beton  dalam  penyelesaian  subsidiary,  amounted  to  Rp 2,541,333,521, 
sebesar  Rp  1.232.239.072.204  dan  peralatan  precast  plant  in  progress  amounted  to  
Perusahaan sebesar Rp 758.612.143.106.  Rp  1,232,239,072,204  and  the  Company’s 
equipment amounted to Rp 758,612,143,106.  
     
Revaluasi  aset  tetap  dilakukan  secara  berkala  setiap    Revaluation  of  fixed  assets  will  be  done 
tiga (3) tahun.  periodically every three (3) years. 
     
Beban penyusutan dialokasikan sebagai berikut:   Depreciation expenses are allocated as follows: 
     
30 September/ September 30,
2019 2018
Rp Rp

Beban Pokok Pendapatan (Catatan 40) 345.901.518.460  516.572.319.085  Cost of Revenues (Note 40)


Beban Umum dan Administrasi General and Administrative
(Catatan 41) 50.761.290.440  32.692.696.798  Expenses (Note 41)
Jumlah 396.662.808.900 549.265.015.883 Total
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

97
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Gedung, pabrik, peralatan proyek dan kendaraan untuk    Buildings,  plants,  project  equipments  and  vehicles 
seluruh  unit  bisnis  serta  kantor  pusat  telah  for  all  business  units  and  head  office  were  insured 
diasuransikan  dengan  nilai  pertanggungan  dan  risiko  in the amount and risk as follows: 
sebagai berikut: 
     
Nama Asuradur/ Jenis Aset/ Periode Asuransi/ Nilai Pertanggungan/ Perusahaan/
Insurer Type of Assets Insurance Period The Sum Insured Company
Rp
PT Asuransi Tri Pakarta Asuransi Risiko Properti/ Property All Risk Insurance 1 Agustus / August 1, 2019 s.d/ to 1 Agustus / August 1, 2020 67.429.710.000  PT Waskita Karya (Persero) Tbk
PT Asuransi Jasindo (Persero) Asuransi Kebakaran/ Fire Insurance 2 Agustus / August 2, 2019 s.d/ to 2 Agustus / August 2, 2020 2.452.470.000  PT Waskita Karya (Persero) Tbk
PT Asuransi Jasindo (Persero) Asuransi Gempa Bumi/ Earthquake Insurance 1 Agustus / August 1, 2019 s.d/ to 1 Agustus / August 1, 2020 2.452.470.000  PT Waskita Karya (Persero) Tbk
PT Asuransi Aspan Asuransi Risiko Properti/ Property All Risk Insurance 25 Mei / May 25, 2019 s.d/ to 25 Mei / May  25, 2020 2.022.226.500  PT Waskita Karya (Persero) Tbk
PT Asuransi Jasindo (Persero) Asuransi Risiko Properti/ Property All Risk Insurance 18 Januari/ January 18, 2019 s.d/ to 18 Januari/ January 18, 2020 441.773.000.000  PT Waskita Beton Precast Tbk
PT Asuransi Umum Bumiputera Muda 1967 Asuransi Risiko Properti/ Property All Risk Insurance 15 Januari / January 15, 2019 s.d/ to 15 Januari / January 15, 2020 135.000.000.000  PT Waskita Karya Realty
PT Asuransi Jasindo (Persero) Asuransi Risiko Properti/ Property All Risk Insurance 18 Januari / January 18, 2019 s.d/ to 18 Januari / January 18, 2020 48.813.750.000  PT Waskita Beton Precast Tbk
PT Asuransi Umum Bumiputera Muda 1967 Kerusakan Mesin/ Machinary Breakdown 15 Januari / January 15, 2019 s.d/ to 15 Januari / January 15, 2020 20.000.000.000  PT Waskita Karya Realty
PT Asuransi Jasindo (Persero) Asuransi Risiko Properti/ Property All Risk Insurance 18 Januari / January 18, 2019 s.d/ to 18 Januari / January 18, 2020 9.062.150.200  PT Waskita Beton Precast Tbk
PT Asuransi Umum Bumiputera Muda 1967 Kerusakan Mesin/ Machinary Breakdown 15 Januari / January 15, 2019 s.d/ to 15 Januari / January 15, 2020 25.000.000.000  PT Waskita Karya Realty
PT Asuransi Umum Bumiputera Muda 1967 Polis Liabilitas Publik/ Public Liability Policy 15 Januari / January 15, 2019 s.d/ to 15 Januari / January 15, 2020 5.000.000.000  PT Waskita Karya Realty
PT Asuransi Ramayana Tbk Contractor's Plant & Equipment Insurance 25 Desember / December 25, 2018 s.d/ to 25 Desember / December 25, 2019 209.825.570.000  PT Waskita Beton Precast Tbk
PT Asuransi Ramayana Tbk Kendaraan Bermotor/ Motor Vehicle 25 Desember / December 25, 2018 s.d/ to 25 Desember / December 25, 2019 597.628.352.630  PT Waskita Beton Precast Tbk
PT Asuransi Wahana Tata Risiko Industri/ Industrial All Risk 25 Desember / December 25, 2018 s.d/ to 25 Desember / December 25, 2019 50.362.500.000  PT Waskita Beton Precast Tbk
PT Asuransi Jasindo (Persero) Asuransi Risiko Properti/ Property All Risk Insurance 18 Januari / January 18, 2019 s.d/ to 18 Januari / January 18, 2020 245.514.000.000  PT Waskita Beton Precast Tbk
PT Asuransi Intra Asia Asuransi Gempa Bumi/ Earthquake Insurance 23 Nopember / November 23, 2018 s.d/ to 23 November / November 23, 2019 327.565.000.000  PT Waskita Karya Infrastruktur (d/h/ formerly  PT Waskita Karya Energi)
PT Asuransi Intra Asia Polis Liabilitas Publik/ Public Liability Policy 23 Nopember / November 23, 2018 s.d/ to 23 November / November 23, 2019 1.000.000.000  PT Waskita Karya Infrastruktur (d/h/ formerly  PT Waskita Karya Energi)
PT Asuransi Intra Asia Risiko Industri/ Industrial All Risk 23 Nopember / November 23, 2018 s.d/ to 23 November / November 23, 2019 327.565.000.000  PT Waskita Karya Infrastruktur (d/h/ formerly  PT Waskita Karya Energi)
PT Asuransi Intra Asia Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance 23 Nopember / November 23, 2018 s.d/ to 23 November / November 23, 2019 117.315.000.000  PT Waskita Karya Infrastruktur (d/h/ formerly  PT Waskita Karya Energi)
Jumlah / Total 2.635.781.199.330
 
 
Manajemen  berpendapat  bahwa  nilai  pertanggungan    The  management  believes  that  insurance 
atas aset tetap yang diasuransikan adalah cukup untuk  coverage for fixed assets which have been insured                  
menutup kemungkinan kerugian yang terjadi. are adequate to cover the possible losses. 
     
17. GOODWILL   17. GOODWILL 
 
30 September/ September 30,
Penambahan/ Pengurangan/
2018 Additions Deduction 2019
Rp Rp Rp Rp

Biaya Perolehan 1.995.908.825.753  --  --  1.995.908.825.753  Acquisition Cost


Nilai Buku 1.995.908.825.753 -- -- 1.995.908.825.753 Net Book Value

 
31 Desember/ December 31,
Penambahan/ Penyesuaian/
2017 Additions Adjustments 2018
Rp Rp Rp Rp

Biaya Perolehan 2.235.779.910.646  --  (239.871.084.893) 1.995.908.825.753  Acquisition Cost


Nilai Buku 2.235.779.910.646 -- (239.871.084.893) 1.995.908.825.753 Net Book Value

 
Rincian nilai tercatat goodwill adalah sebagai berikut:    The details of goodwill are as follows: 
     
Nilai Neto/ Net Value
Entitas Pengakuisisi/ Perolehan Saham pada/ Tahun Perolehan/ 30 September/ 31 Desember/
Acquirer Entity Share Acquisition in Year of Acquisition September 30, 2019 December 31, 2018
Rp Rp

PT Waskita Toll Road PT MTD CTP Expressway (CTP) 2017 602.593.363.949 602.593.363.949


PT Waskita Toll Road PT Pemalang Batang Toll Road (PBTR) 2016 183.723.536.629 183.723.536.629
PT Waskita Toll Road PT Waskita Sriwijaya Tol (dh/ formerly            2016 58.782.241.692 58.782.241.692
PT Sriwijaya Markmore Persada) (WST)
PT Waskita Toll Road PT Cimanggis Cibitung Tollways (CCT) 2015 466.615.258.744 466.615.258.744
PT Waskita Toll Road PT Trans Jabar Tol (TJT) 2015 684.194.424.739 684.194.424.739
Jumlah/ Total 1.995.908.825.753 1.995.908.825.753
 
 
 
 
 
 

98
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Akuisisi CTP  CTP Acquisition
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
CTP (55 %) CTP (55 %)
Imbalan yang Dialihkan  715.000.000.000  715.000.000.000  Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and
Teridentifikasi yang Diperoleh (112.406.636.051) (112.406.636.051) Liabilities Acquired  
Goodwill 602.593.363.949 602.593.363.949 Goodwill
 
 
Pada  tanggal  26  April  2017,  WTR  dan  PT  MTD  Capital    On  April  26,  2017, WTR  and  PT  MTD  Capital  BHD 
BHD  dan  PT  Nusacipta  Etika  Pratama  menandatangani  and  PT  Nusacipta  Etika  Pratama  entered  into  an 
perjanjian  pembelian  55%  kepemilikan  PT  CTP  dengan  agreement  to  purchase  55%  ownership  in  PT  CTP 
harga perolehan sebesar Rp 715.000.000.000. amounted to Rp 715,000,000,000.
   
Nilai  wajar  aset  yang  diperoleh  dan  kewajiban  yang    The  fair  values  of  the  assets  acquired  and 
dialihkan pada tanggal akuisisi adalah sebagai berikut: the transferred liabilities at the acquisition date were 
as follows:
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Kas dan Setara Kas 17.343.287.994  17.343.287.994  Cash and Cash Equivalents


Uang Muka dan Biaya Dibayar Dimuka 297.576.173.928  297.576.173.928  Advances and Prepayments
Aset Tak Berwujud - Intangible Assets -
Hak Pengusahaan Jalan Tol 440.621.654.574  440.621.654.574  Toll Road Concession Right 
Utang Bank (330.186.844.740) (330.186.844.740) Bank Loan
Utang Pihak Berelasi (137.177.789.760) (137.177.789.760) Related Parties Payable
Liabilitas Lain-lain (83.800.780.085) (83.800.780.085) Other Liabilities
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 204.375.701.911  204.375.701.911  Net Asset Acquired 
Nilai Wajar Aset Kepentingan Fair Value of 
Non-Pengendali (91.969.065.860) (91.969.065.860) Non-Controlling Interest  
Goodwill 602.593.363.949  602.593.363.949  Goodwill
Nilai Wajar Imbalan yang Dialihkan 715.000.000.000 715.000.000.000 Fair Value of Consideration
 
Akuisisi WST (dh SRIMP)  WST (formerly SRIMP) Acquisition 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
WST (60 %) WST (60 %)
Imbalan yang Dialihkan  315.000.000.000  315.000.000.000  Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and
Teridentifikasi yang Diperoleh (256.217.758.308) (256.217.758.308) Liabilities Acquired  
Goodwill 58.782.241.692 58.782.241.692 Goodwill
 
Pada  tanggal  19  Mei  2016,  WTR  dan  PT  Persada  On  May 19, 2016, WTR and PT Persada Tanjung 
Tanjung Api-api, menandatangani perjanjian pembelian  Api-api  entered  into  an  agreement  to  purchase 
60%  kepemilikan  WST  dengan  harga  perolehan  60%  ownership  in  WST  amounted  to  
sebesar  Rp  315.000.000.000.  Nilai  wajar  aset  yang  Rp  315,000,000,000.  The  fair  value  of  assets 
diperoleh  dan  kewajiban  yang  dialihkan  pada  tanggal  acquired  and  the  transferred  liabilities  at  
akuisisi adalah sebagai berikut:  the acquisition date were as follows: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Kas dan Setara Kas 303.517.604.893  303.517.604.893  Cash and Cash Equivalents
Aset Pajak Tangguhan 1.232.557.000  1.232.557.000  Deffered Tax Assets
Proyek dalam Pelaksanaan 135.758.968.659  135.758.968.659  Project on Progress
Aset Tetap 36.876.125  36.876.125  Fixed Assets
Utang Pajak (6.050.791.698) (6.050.791.698) Tax Payables
Liabilitas Lain-lain (7.465.617.800) (7.465.617.800) Other Liabilities
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 427.029.597.179  427.029.597.179  Net Asset Acquired 
Nilai Wajar Aset Kepentingan Fair Value of 
Non-Pengendali (170.811.838.872) (170.811.838.872) Non-Controlling Interest  
Goodwill 58.782.241.693  58.782.241.693  Goodwill
Nilai Wajar Imbalan yang Dialihkan 315.000.000.000 315.000.000.000 Fair Value of Consideration

99
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
   

Akuisisi PBTR  PBTR Acquisition 

30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
PBTR (60 %) PBTR (60 %)
Imbalan yang Dialihkan  220.000.000.000  220.000.000.000  Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and
Teridentifikasi yang Diperoleh (36.276.463.371) (36.276.463.371) Liabilities Acquired  
Goodwill 183.723.536.629 183.723.536.629 Goodwill

 
Pada  tanggal  15  Pebruari  2016,  WTR  dan   On  February  15,  2016,  WTR  and  
PT  Langkah  Utama  Perkasa,  Countryside  Investment  PT  Langkah  Utama  Perkasa,  Countryside 
Corporation  dan  PT  Sumber  Mitra  Jaya,  Investment  Corporation  and  PT  Sumber  Mitra  
menandatangani  perjanjian  pembelian  60%  Jaya  entered  into  an  agreement  to  purchase  
kepemilikan  PBTR  dengan  harga  perolehan  sebesar  60%  ownership  in  PBTR  amounted  to  
Rp  220.000.000.000.  Nilai  wajar  aset  yang  diperoleh  Rp  220,000,000,000.  The  fair  value  of  assets 
dan  kewajiban  yang  dialihkan  pada  tanggal  akuisisi  acquired  and  the  transferred  liabilities  at  
adalah sebagai berikut:  the acquisition date were as follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Kas dan Setara Kas 44.721.174  44.721.174  Cash and Cash Equivalents


Uang Muka dan Biaya Dibayar Dimuka 576.893.132  576.893.132  Advances and Prepayments
Aset Tak Berwujud - Intangible Assets -
Hak Pengusahaan Jalan Tol 59.839.157.979  59.839.157.979  Concession Right Toll Road
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 60.460.772.285  60.460.772.285  Net Asset Acquired  
Nilai Wajar Aset Kepentingan Fair Value of 
Non-Pengendali (24.184.308.914) (24.184.308.914) Non-Controlling Interest  
Goodwill 183.723.536.629  183.723.536.629  Goodwill
Nilai Wajar Imbalan yang Dialihkan 220.000.000.000 220.000.000.000 Fair Value of Consideration

 
Akuisisi TJT  TJT Acquisition 

30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
TJT (81.65%) TJT (81.65%)
Imbalan yang Dialihkan  944.336.642.803  944.336.642.803  Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and
Teridentifikasi yang Diperoleh (260.142.218.064) (260.142.218.064) Liabilities Acquired  
Goodwill 684.194.424.739 684.194.424.739 Goodwill

 
Pada  tanggal  11  Nopember  2015,  WTR  bersama   On  November  11,  2015,  WTR  and  
PT  Bukaka  Teknik  Utama,  PT  Graha  Multitama  PT  Bukaka  Teknik  Utama,  PT  Graha  Multitama 
Sejahtera  dan  PT  Karya  Perkasa  Insani  Sejahtera  and  PT  Karya  Perkasa  Insani  entered 
menandatangani  perjanjian  pembelian  81,65%  into  an agreement  to  purchase  81.65%  ownership 
kepemilikan  TJT  dengan  harga  perolehan  sebesar   in  TJT  amounted  to  Rp  944,336,642,803.  The  fair 
Rp  944.336.642.803.  Nilai  wajar  aset  yang  diperoleh  value  of  assets  acquired  and  the  transferred 
dan  kewajiban  yang  dialihkan  pada  tanggal  akuisisi  liabilities at the acquisition date were as follows: 
adalah sebagai berikut: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Kas dan Setara Kas 4.525.513.134  4.525.513.134  Cash and Cash Equivalents
Uang Muka dan Biaya Dibayar Dimuka 55.380.122.729  55.380.122.729  Advances and Prepaid Expenses
Aset Tak Berwujud - Intangible Assets -
Hak Penguasahaan Jalan Tol 210.596.774.983  210.596.774.983  Concession Right Toll Road
Aset Tetap dalam Konstruksi 761.525.928.371  761.525.928.371  Asset under Construction
Aset Lain-lain (544.722.104.382) (544.722.104.382) Other Assets

100
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Utang Usaha (168.360.859.675) (168.360.859.675) Accounts Payable
Utang Pajak (40.926.508) (40.926.508) Tax Payables
Liabilitas Lainnya (80.750.000) (80.750.000) Other liabilities
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 318.823.698.652  318.823.698.652  Net Asset Acquired  
Nilai Wajar Aset Kepentingan Fair Value of 
Non-Pengendali (58.681.480.588) (58.681.480.588) Non-Controlling Interest  
Goodwill 684.194.424.739  684.194.424.739  Goodwill
Nilai Wajar Imbalan yang Dialihkan 944.336.642.803 944.336.642.803 Fair Value of Consideration

 
Akuisisi CCT CCT Acquisition 

30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp   
CCT (90%) CCT (90%)
Imbalan yang Dialihkan  551.250.000.000  551.250.000.000  Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and 
Teridentifikasi yang Diperoleh (84.634.741.256) (84.634.741.256) Liabilities Acquired
Goodwill 466.615.258.744 466.615.258.744 Goodwill

 
Pada  tanggal  13  Juli  2015,  WTR  dan   On July 13, 2015, WTR and PT Bakrie & Brothers 
PT  Bakrie  &  Brothers  Tbk  menandatangani  perjanjian  Tbk,  entered  into  an  agreement  to  purchase  90% 
pembelian  90%  kepemilikan  CCT  dengan  harga  ownership  in  CCT  amounted  to  
perolehan  sebesar  Rp  551.250.000.000.  Nilai  wajar  Rp  551,250,000,000.  The  fair  value  of  assets 
aset yang diperoleh dan kewajiban yang dialihkan pada  acquired  and  the  transferred  liabilities  at  
tanggal akuisisi adalah sebagai berikut:  the acquisition date were as follows:  
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Kas dan Setara Kas 202.869.015  202.869.015  Cash and Cash Equivalents


Uang Muka dan Biaya Dibayar Dimuka 7.000.000  7.000.000  Advances and Prepayments
Piutang Lain-lain Pihak Berelasi 70.519.462.085  70.519.462.085  Other Receivables - Related Parties
Aset Tetap dalam Konstruksi 53.886.970.322  53.886.970.322  Asset under Construction
Beban Akrual (758.833.655) (758.833.655) Accrued Expenses
Liabilitas Lainnya (875.820.000) (875.820.000) Other Liabilities
Utang Lain-lain Berelasi (28.943.046.371) (28.943.046.371) Other Payables - Related Parties
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 94.038.601.396  94.038.601.396  Net Asset Acquired  
Nilai Wajar Aset Kepentingan Fair Value of 
Non Pengendali (9.403.860.140) (9.403.860.140) Non Controlling Interest  
Goodwill 466.615.258.744  466.615.258.744  Goodwill
Nilai Wajar Imbalan yang Dialihkan 551.250.000.000 551.250.000.000 Fair Value of Consideration

 
Pada  bulan  Juni  2016,  CCT,  entitas  anak  dari  WTR,  In  June  2016,  CCT,  a  subsidiary  of  WTR,  made 
melakukan  perubahan  atas  saldo  cadangan  modal  changes on the balance of paid-up capital reserves 
disetor  sebesar  Rp  1.000.000.000  sehingga  amounted  to  Rp  1,000,000,000  so  the  Company 
mengkoreksi  saldo  goodwill  WTR  sebesar   changed the balance of WTR’s goodwill amounted 
Rp 900.000.000 menjadi sebesar Rp 466.615.258.744.  to Rp 900,000,000 becoming Rp 466,615,258,744. 

18. ASET LAIN-LAIN   18. OTHER ASSETS 


 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Beban Kontrak Ditangguhkan 1.167.118.482.760  391.791.699.443  Contract Deferred Charges
Kontrak Sewa Jangka Panjang  35.267.477.380  49.009.574.538  Long-Term Rent Contract
Perangkat Lunak 58.913.391.261  46.144.267.715  Software
Aset Lain-lain Dalam Pengembangan (Catatan 14) 42.375.183.266  --  Other Assets in Progress (Note 14)
Tanah dan Bangunan 7.335.104.427  7.852.869.160  Lands and Buildings
Uang Jaminan 1.701.722.000  1.652.822.000  Warranty
Aset Tetap Tidak Digunakan Untuk Dijual --  116.581.984  Fixed Assets are not Used for Sale
Jumlah 1.312.711.361.094 496.567.814.840 Total
 

101
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Beban kontrak yang ditangguhkan merupakan beban  Contract  deferred  charges  represent  deferred 
yang  ditangguhkan  atas  proyek-proyek  yang  dalam  expense  of  the  projects’  preparation,  which  will  be 
persiapan,  yang  akan  dibebankan  sebagai  beban  charged  as  expense  when  the  project  contract  is 
kontrak pada saat proyek tersebut dilaksanakan.  executed. 
   
Kontrak sewa jangka panjang merupakan biaya sewa  Long-term  rent  contracts  represent  long-term  land 
tanah jangka panjang dengan jangka waktu 1 sampai  rent with a period of 1 to 5 years. 
dengan 5 tahun. 
 
Perangkat Lunak terdiri dari:  Software consists of: 
 
30 September/ September 30, 2019
Harga Perolehan/ Akumulasi Amortisasi/ Nilai Buku/
Historical Cost Accumulated Amortication Book Value

SAP Hana (dalam Pengembangan/ in Developing ) 37.521.797.522  --  37.521.797.522 


ERP MS Dynamics AX2012 30.496.422.159  17.735.494.018  12.760.928.141 
Auto Desk CAD Design 16.946.735.869  9.126.768.490  7.819.967.379 
Waskita Employee Self Service Technology (WEST) 822.180.000  176.612.500  645.567.500 
IFCA Software 165.130.719  --  165.130.719 
Jumlah/ Total 85.952.266.269 27.038.875.008 58.913.391.261

31 Desember/ December 31, 2018


Harga Perolehan/ Akumulasi Amortisasi/ Nilai Buku/
Historical Cost Accumulated Amortication Book Value

ERP MS Dynamics AX2012 48.207.087.141  10.295.801.653  37.911.285.488 


Auto Desk CAD Design 14.726.539.593  7.457.739.735  7.268.799.858 
Waskita Employee Self Service Technology (WEST) 822.180.000  22.453.750  799.726.250 
IFCA Software 164.456.119  --  164.456.119 
Jumlah/ Total 63.920.262.853 17.775.995.138 46.144.267.715

Aset  lain-lain  tanah  dan  bangunan  adalah  sebagai    Others asset land and building as follows: 


berikut: 
 
1.  Tanah  di  Cengkareng  yang  dibeli  oleh    1.  Land located in Cengkareng which was purchased 
Perusahaan  pada  tanggal  21  Mei  1991.  by  the  Company  on  May  21,  1991.  Furthermore, 
Selanjutnya,  ditahun  1996,  Perusahaan  in  1996,  the  Company  submitted  a  letter  to  
menyampaikan  Surat  kepada Kepala  Dinas  Tata  the Head of City Planning, West Jakarta regarding             
Kota  Jakarta  Barat  mengenai  peruntukkan  tanah  the  designation  of  the  land.  Then  the  Company 
tersebut.  Kemudian  Perusahaan  memperoleh  received  the  answer  by  letter  from  the  Sub 
jawaban  berdasarkan  Surat  Pemerintah  Department of City Planning, West Jakarta District 
Kotamadya  Jakarta  Barat  Suku  Dinas  Tata  Kota  No.  288/17125  dated  July 18,  1996,  which stated 
No.  288/17125  tanggal  18 Juli  1996,  yang  that  in  accordance  with  the  planning  of  
menyebutkan  sesuai  dengan  Rencana  Bagian  the  Kalideres  District  year  2005,  the  land  is 
Wilayah  Kota  Kecamatan  Kalideres  tahun  2005  allocated  for  the  Public  Green  Improvement. 
lokasi  tanah  tersebut  diperuntukan  untuk  Hence  the  Company  can  not  process        
Penyempurnaan  Hijau  Umum  (PHU).  Sehingga  the certificated ownership further. 
Perusahaan  tidak  dapat  memproses  sertifikat 
kepemilikan lebih lanjut. 
 
2.  Apartemen Sahid berlokasi di Jalan K.H. Mansur    2.  Sahid  Apartment  located  in  K.H.  Mansur  Jakarta 
Jakarta  yang  merupakan  kompensasi  that  represents  the  payment  compensation  of 
pembayaran  piutang  retensi  dari  PT  Sahid  Inti  retension  receivables  of  PT Sahid  Inti  Dinamika 
Dinamika pada tanggal 22 Oktober 1997.  on the date of October 22, 1997. 
     
Perusahaan  tidak  menggunakan  tanah  dan    The  Company  does  not  use  the  land  and    
apartemen  tersebut  dalam  proses  produksi  ataupun  the  apartment  in  the  process  of  producing  or  rent  to 
menyewakannya  kepada  pihak  ketiga,  sehubungan  the  third  parties  in  line  with  those  assets  is  not  
aset  tersebut  tidak  terkait  dengan  kegiatan  utama  related  to  the  main  activities  of  the  Company.  
Perusahaan.  Perusahaan  berpendapat  bahwa  The  management  believes  that  the  land  and  the 
apartemen  tanah  tersebut  tidak  memenuhi  kriteria  apartment do not meet the criteria to be classified as 
untuk  diklasifikasikan  sebagai  aset  tetap,  sehingga  fixed  asset,  so  that  those  assets  are  recorded  as 
mencatat aset tersebut diatas sebagai aset lain-lain.  other assets. 
     

102
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Nama Proyek Bagi Hasil/ Harga Perolehan/ Lokasi/
Name of Profit Sharing Project Historical Cost Location
1 Teraskita Bandung 11.084.277.744  Bandung
2 Teraskita Makasar 31.290.905.522  Makasar
Jumlah/ Total 42.375.183.266
 
 
Berdasarkan  Surat  Pernyataan  Direksi  tanggal     Based  on  the  Board  of  Directors'  Statement  dated 
18  April  2017,  Perusahaan  memberikan  hak  April  18,  2017,  the  Company  granted  
pengembangan tanah seluas 1.535 M2 yang terletak  the  development  rights  of  1,535  sqm  of  land  located 
di  Jl.  Asia  Afrika    No.  55  RT  003  RW  03  Kelurahan  on  Jl.  Asia  Africa  No.  55  RT  003  RW  03  Kebon 
Kebon  Pisang  Kecamatan  Sumur  Bandung   Pisang Village,  Sumur Bandung District with proof of 
dengan bukti kepemilikan SHGB No. 655 atas nama  ownership  of  SHGB  No.  655  on  behalf  of  
Perusahaan  kepada  PT  Waskita  Karya   the Company to PT Waskita Karya Realty. Based on 
Realty.  Berdasarkan  Surat  Pernyataan   Statement  No.  81/SPN/WK/2017  dated  September 
No.  81/SPN/WK/2017  tanggal  29  September  2017,  29,  2017,  the  Company  provides  development  rights 
Perusahaan  memberikan  hak  pengembangan  tanah  to  land  covering  an  area  of  1,661  sqm  based  on 
seluas 1.661 M2 berdasarkan SHGB No. 20407 dan  SHGB No. 20407 and an area of 168 sqm based on 
seluas  168  M2  berdasarkan  SHGB  No.  20403  atas  SHGB No. 20403 on behalf of the Company, located 
nama  Perusahaan,  yang  terletak  di  Jalan  Jl.  A.P.  on  Jalan  Jl.  A.P.  Pettarani  88  RT  002  RW  02  Exit 
Pettarani  88  RT  002  RW  02  Keluarahan  Buakana  Buakana Rappocini District, Makassar City. 
Kecamatan Rappocini Kota Makasar. 
 
19. ASET TAK BERWUJUD – HAK PENGUSAHAAN   19. INTANGIBLE ASSETS – TOLL ROAD
JALAN TOL CONCESSION RIGHTS 
 
30 September/ September 30, 2019
Saldo Awal/ Penambahan/ Pengurangan/ Reklasifikasi/ Saldo Akhir/
Beginning Balance Additions Deduction Reclasification Ending Balance
Rp Rp Rp Rp Rp
Biaya Perolehan Acquisition Cost
Ruas Jalan Tol : Toll Road Section :
Pemalang - Batang 690.497.633.291  6.468.531.673.213  --  (22.877.075.282) 7.136.152.231.222  Pemalang - Batang
Bekasi - Cawang - Kp Melayu 3.927.214.535.935  --  --  --  3.927.214.535.935  Bekasi - Cawang - Kp Melayu
Ciawi - Sukabumi --  4.598.287.819.795  --  --  4.598.287.819.795  Ciawi - Sukabumi

4.617.712.169.226  11.066.819.493.008  --  (22.877.075.282) 15.661.654.586.952 

Aset Dalam Penyelesaian Construction in Progress


Ruas Jalan Tol : Toll Road Section :
Bekasi - Cawang - Bekasi - Cawang -
Kampung Melayu 1.972.334.661.823  1.400.416.040.885  --  --  3.372.750.702.708  Kampung Melayu
Cimanggis - Cibitung  3.507.714.033.665  1.834.989.971.385  --  --  5.342.704.005.050  Cimanggis - Cibitung
Ciawi - Sukabumi  4.723.630.727.424  386.098.340.219  (4.598.287.819.795) --  511.441.247.848  Ciawi - Sukabumi
Kayu Agung - Kayu Agung - 
Palembang - Betung 8.104.695.754.538  2.291.502.174.719  --  --  10.396.197.929.257  Palembang - Betung
Cibitung - Cilincing 3.253.684.150.965  2.710.336.726.930  --  --  5.964.020.877.895  Cibitung - Cilincing
Pemalang - Batang 6.428.909.489.583  135.150.520.480  (6.468.531.673.213) 22.877.075.282  118.405.412.132  Pemalang - Batang
Krian-Legundi-Bunder 7.634.857.631.813  2.227.949.300.731  --  --  9.862.806.932.544  Krian-Legundi-Bunder
35.625.826.449.811           10.986.443.075.349  (11.066.819.493.008) 22.877.075.282             35.568.327.107.434 
Akumulasi Accumulated
Amortisasi    Amortization
Ruas Jalan Tol : Toll Road Section :
Pemalang - Batang 446.029.841  40.686.151.726  --  --  41.132.181.567  Pemalang - Batang
Bekasi - Cawang - Kp Melayu 9.847.428.605  10.227.211.867  --  --  20.074.640.472  Bekasi - Cawang - Kp Melayu
Ciawi - Sukabumi --  19.369.305.170  --  --  19.369.305.170  Ciawi - Sukabumi

10.293.458.446  70.282.668.763  --  --  80.576.127.209 


Nilai Tercatat 40.233.245.160.591 51.149.405.567.177 Carrying Value
 
 

103
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
31 Desember/ December 31, 2018
Saldo Awal/ Penambahan/ Pengurangan/ Penyesuaian/ Saldo Akhir/
Beginning Balance Additions Deduction Adjustment Ending Balance
Rp Rp Rp Rp Rp
Biaya Perolehan Acquisition Cost
Ruas Jalan Tol : Toll Road Section :
Kanci - Pejagan  3.781.863.956.418  --  (3.781.863.956.418) --  --  Kanci - Pejagan
Pejagan - Pemalang  2.216.218.041.782  --  (2.216.218.041.782) --  --  Pejagan - Pemalang
Pemalang - Batang --  690.497.633.291  --  --  690.497.633.291  Pemalang - Batang
Bekasi - Cawang - Kp Melayu 3.927.214.535.935  --  --  --  3.927.214.535.935  Bekasi - Cawang - Kp Melayu

9.925.296.534.135  690.497.633.291  (5.998.081.998.200) --  4.617.712.169.226 

Aset Dalam Penyelesaian Construction in Progress


Ruas Jalan Tol : Toll Road Section :
Kanci - Pejagan 75.619.200.142  5.748.333.591  (81.367.533.733) --  --  Kanci - Pejagan
Bekasi - Cawang - Bekasi - Cawang -
Kampung Melayu 1.210.379.700.393  761.954.961.430  --  --  1.972.334.661.823  Kampung Melayu
Cimanggis - Cibitung  1.714.437.999.533  1.793.276.034.132  --  --  3.507.714.033.665  Cimanggis - Cibitung
Pejagan - Pemalang  3.298.220.365.906  16.235.482.332  (3.314.455.848.238) --  --  Pejagan - Pemalang
Pasuruan - Probolinggo  1.787.639.683.039  12.826.801.126  (1.800.466.484.165) --  --  Pasuruan - Probolinggo
Ciawi - Sukabumi  2.905.677.128.568  1.817.953.598.856  --  --  4.723.630.727.424  Ciawi - Sukabumi
Kayu Agung - Kayu Agung - 
Palembang - Betung 4.548.220.139.490  3.556.475.615.048  --  --  8.104.695.754.538  Palembang - Betung
Cibitung - Cilincing 763.235.664.744  2.490.448.486.221  --  --  3.253.684.150.965  Cibitung - Cilincing
Pemalang - Batang 3.603.993.037.666  3.515.414.085.208  (690.497.633.291) --  6.428.909.489.583  Pemalang - Batang
Krian-Legundi-Bunder 4.554.298.825.637  3.080.558.806.176  --  --  7.634.857.631.813  Krian-Legundi-Bunder
24.461.721.745.118           17.050.892.204.120  (5.886.787.499.427)                                         -              35.625.826.449.811 
Akumulasi Accumulated
Amortisasi    Amortization
Ruas Jalan Tol : Toll Road Section :
Kanci - Pejagan  429.207.926.932  --  (429.207.926.932) --  --  Kanci - Pejagan
Pejagan - Pemalang  24.302.910.755  --  (24.302.910.755) --  --  Pejagan - Pemalang
Pemalang - Batang --  446.029.841  --  --  446.029.841  Pemalang - Batang
Bekasi - Cawang - Kp Melayu 823.199.912  9.024.228.693  --  --  9.847.428.605  Bekasi - Cawang - Kp Melayu

454.334.037.599  9.470.258.534  (453.510.837.687) --  10.293.458.446 


Nilai Tercatat 33.932.684.241.654 40.233.245.160.591 Carrying Value
 
 
Pada  tanggal  31  Desember  2018  aset  takberwujud    As  of  December  31,  2018,  WTR’s  intangible  assets 
dari  hak  pengusahaan  jalan  tol  WTR  mengalami  from  toll  road  concession  rights  have  decreased  by 
penurunan  sebesar  Rp  11.431.358.659.940  yang  Rp  11,431,358,659,940  caused  by  the  release  of 
disebabkan  oleh  pelepasan  ruas  tol  Kanci  –  Kanci  -  Penjagan  toll  road,  Pejagan  -  Pemalang,  and 
Penjagan,  Pejagan  –  Pemalang,  dan  Pasuruan  –  Pasuruan – Probolinggo (Note 56.C). 
Probolinggo (Catatan 56.C).
     
20. ASET KEUANGAN ATAS PROYEK KONSESI   20. FINANCIAL ASSETS FROM CONCESSION
PROJECT 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Pembayaran Kapasitas Minimum di Masa Depan: Future Minimum Capacity Payment Not Later Than One Year
Tidak Lebih dari Satu Tahun 55.936.980.000  79.146.492.651  Not Later than One Year
Lebih dari Satu Tahun Tetapi Tidak Lebih Dari Lima Tahun 256.776.980.240  272.201.775.120  Later than One Year Later than Five Year
Lebih dari Lima Tahun 631.465.452.640  633.567.669.469  Later than Five Year
Jumlah Pembayaran Kapasitas Minimum di Masa Depan 944.179.412.880  984.915.937.240  Total Future Minimum Capacity Payments

Pendapatan Keuangan yang Belum Diterima 591.235.262.660  590.164.482.591  Less Unearned Financial Revenue


Nilai Sekarang dari Pembayaran Kapasitas Masa Depan 352.944.150.220  394.751.454.649  Present Value of Future Capacity Payments

Dikurangi: Bagian yang Jatuh Tempo Dalam Satu Tahun 3.365.302.879  13.129.339.111  Current Portion


Bagian Jangka Panjang 349.578.847.341 381.622.115.538 Non-Current Portion

 
Akun  ini  merupakan  piutang  tidak  lancar  dari  PLN    This  account  represents  non  current  receivable  from 
sehubungan dengan pembayaran kapasitas minimum  PLN  in  relation  to  the  future  minimum  capacity 
masa  depan  yang  tercantum  dalam  PPA  yang  telah  payments  set  forth  in  PPA  that  have  been 
diklasifikasikan sebagai aset keuangan sebagai hasil  classified as financial asset as a result of adoption of 

104
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
penerapan  ISAK  16.  Jumlah  pendapatan  konstruksi  ISAK  16.  The  amount  of  total  construction  revenue 
yang  terkait  dengan  aset  keuangan  ini  pada  related  to  this  financial  asset  as  of  September  30, 
tanggal  30  September  2019  dan  2018  masing  -  2019  and  2018  are  Rp  6,502,731,217  and 
masing  adalah  sebesar  Rp  6.502.731.217  dan  Rp 6,502,731,217, respectively. 
Rp 6.502.731.217. 
     
Pada  tanggal  9  Desember  2016,  WSE  memulai    On  December  9,  2016,  WSE  had  its  commercial 
operasi  komersial  (COD)  untuk  proyek  konsesi  ini.  operation  date  (COD)  on  this  concession 
Pada  tanggal  30  September  2019  dan  2018,  project.  As  of  September  30,  2019  and  2018, 
WSE  mengakui  pendapatan  konsesi  masing-masing  the  WSE  recognized  the  concession  revenues 
sebesar Rp 37.815.265.259 dan Rp 21.680.109.285.  amounted  to  Rp  37,815,265,259  and 
Rp 21,680,109,285,  respectively.  
     
Fasilitas  pembangkit  tenaga  mini  hidro  (infrastruktur)    Mini  hydro  power  generating  facility  (infrastructure) 
telah  dijadikan  jaminan  untuk  pinjaman  jangka  has been pledged as collateral for long-term loan from 
panjang  dari  pihak  ketiga  dan  pihak  berelasi  the third party and the related party (Note 23.b). 
(Catatan 23.b). 
 
21. UTANG USAHA   21. ACCOUNTS PAYABLE
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pemasok 6.637.661.632.173 7.590.922.823.740 Suppliers
Subkontraktor 4.774.558.357.239 5.534.308.199.618 Subcontractors
Sewa Alat 721.801.073.058 818.008.865.990 Rental Equipment
Upah Kerja 351.137.622.273 94.898.107.701 Wages
Lain-lain  427.838.539.492 867.695.001.917 Others
Jumlah 12.912.997.224.235 14.905.832.998.966 Total

22. UTANG BANK JANGKA PENDEK   22. SHORT-TERM BANK LOANS 


 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
Perusahaan/ The Company
PT Bank Mandiri (Persero) Tbk  5.487.020.615.908 4.789.214.194.112
PT Bank Negara Indonesia (Persero) Tbk 2.821.979.209.926 2.148.464.882.826
PT Bank Rakyat Indonesia (Persero) Tbk 2.666.607.674.038 1.272.706.650.083
PT Bank Syariah Mandiri 1.497.980.562.553 999.999.999.744
Indonesia Eximbank  999.547.892.246 1.949.700.000.000
Sindikasi/ Syndication  Transmisi Sumatera 500 KV
PT Bank Rakyat Indonesia (Persero) Tbk 689.256.515.272 592.291.027.654
   Indonesia Eximbank 325.902.840.700 270.725.279.811
Sindikasi/ Syndication  Jakarta - Cikampek Elevated II
   PT Bank Mandiri (Persero) Tbk  643.154.866.544 424.266.909.090

Entitas Anak/ Subsidiary Entity - WBP


PT Bank BRIsyariah Tbk 512.000.000.000 512.000.000.000
PT Bank Mandiri (Persero) Tbk 435.863.758.291 --
PT Bank Tabungan Negara (Persero) Tbk 400.000.000.000 600.000.000.000
PT Bank Rakyat Indonesia (Persero) Tbk 379.099.999.998 670.359.467.938
PT Bank Negara Indonesia (Persero) Tbk  50.000.000.000 350.000.000.019
`
Entitas Anak/ Subsidiary Entity - WTR
PT Bank Rakyat Indonesia (Persero) Tbk 2.386.517.288.079 1.259.252.695.484
Sub Jumlah/ Sub Total 19.294.931.223.555 15.838.981.106.761
Pihak Ketiga/ Third Parties
Perusahaan/ The Company
PT Bank Pan Indonesia Tbk  2.494.360.645.571 2.000.000.000.000
PT Bank Pembangunan Daerah
   Jawa Barat dan Banten Tbk  1.599.985.000.000 845.000.000.000
PT Bank DKI 997.539.383.769 1.000.000.000.000
PT Bank BTPN Tbk  (d/h /formerly  PT Bank Sumitomo Mitsui Indonesia) 950.000.000.000 700.000.000.000
PT Bank Maybank Indonesia Tbk  949.597.569.443 --
PT Bank UOB Indonesia  869.689.359.176 335.666.043.122

105
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
PT Bank DBS Indonesia 858.135.500.000 --
Bank of China Ltd 600.000.000.000 500.000.000.000
PT Bank BNP Paribas Indonesia 498.750.000.000 --
PT Bank OCBC NISP Tbk 417.558.557.723 362.562.066.828
PT Bank Mizuho Indonesia 326.764.767.576 280.138.925
Bank of Tokyo Mitsubishi UFJ, Ltd. 663.819 168.112.661.042
PT Bank CIMB Niaga Tbk - Unit Usaha/ Business Unit  Syariah -- 500.000.000.000
Sindikasi/ Syndication  Transmisi Sumatera 500 KV
   PT Bank Central Asia Tbk  434.537.169.616 360.967.055.125
   PT Bank Maybank Indonesia Tbk 152.087.992.325 126.338.463.910
Sindikasi/ Syndication  Jakarta - Cikampek Elevated II
   PT Bank CIMB Niaga Tbk 725.154.866.544 424.266.909.090
   PT Bank Central Asia Tbk  300.141.507.624 424.266.909.090
   Bank of Tokyo Mitsubishi UFJ, Ltd. 91.624.934.891 212.133.090.910
   PT Bank BNP Paribas Indonesia 291.576.933.456 212.133.090.910
   PT Bank KEB Hana Indonesia 202.804.600.000 90.800.000.000
Sindikasi/ Syndication  Cinere Serpong
   PT Bank CIMB Niaga Tbk 325.964.466.010 267.189.000.000
   PT Bank DBS Indonesia 217.309.644.007 178.126.000.000
   PT Bank KEB Hana Indonesia 99.653.830.831 81.685.000.000
Entitas Anak/ Subsidiary Entity - WBP
PT Bank DKI 580.000.000.000 644.200.000.000
PT Bank BTPN Tbk  (d/h /formerly  PT Bank Sumitomo Mitsui Indonesia) 499.645.420.843 486.714.847.274
Bank of Tokyo Mitsubishi UFJ, Ltd. 450.000.000.000 450.000.000.000
PT Bank UOB Indonesia  450.000.000.000 --
PT Bank Permata Tbk 300.000.000.000 300.000.000.000
PT Bank CTBC Indonesia 300.000.000.000 300.000.000.000
PT Bank BCA Syariah 100.000.000.000 100.000.000.000
PT Bank ICBC Indonesia 87.421.248.107 700.000.000.000
PT Bank CIMB Niaga Tbk -- 299.824.895.228
PT Bank Pembangunan Daerah Banten Tbk  -- 50.000.000.000
Sub Jumlah/ Sub Total 16.170.304.061.331 12.120.266.171.454
Jumlah/ Total 35.465.235.284.886 27.959.247.278.215
 
Suku bunga kontraktual per tahun :     Contractual interest rate per annum : 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018

Perusahaan/ The Company


PT Bank Negara Indonesia (Persero) Tbk 9% - 9,50% 8,50%
PT Bank Rakyat Indonesia (Persero) Tbk 8,50% 8,10%
PT Bank Mandiri (Persero) Tbk 8,55% - 9,05% 8,00% - 8,10%
Indonesia Eximbank  8,50% 7,80% - 8,40%
PT Bank Pan Indonesia Tbk 8,50% 8,50%
PT Bank BTPN Tbk (d/h /formerly PT Bank Sumitomo Mitsui Indonesia) 8,00% 8,00%
Bank of Tokyo Mitsubishi UFJ, Ltd. 8,50% - 8,53% 8,68%
PT Bank UOB Indonesia 8,50% - 8,60% 8,00% - 8,40%
PT Bank DKI 8,35% 7,80%
PT Bank DBS Indonesia 9,25% - 9,35% 9,30%
PT Bank CIMB Niaga Tbk  8,85% 8,25%
PT Bank Syariah Mandiri 8,55% 7,50%
PT Bank BNP Paribas Indonesia 8,95% Cost of Fund + 1,20%
PT Bank Pembangunan Daerah 
Jawa Barat dan Banten Tbk 8,1% - 9,00% 7,50%
PT Bank Rakyat Indonesia (Persero) Tbk
dan PT Bank Central Asia - Kredit Sindikasi/ Syndicated Credit 9,83% 8,83%
PT Bank Maybank Indonesia Tbk 9,00% 9,25%
PT Bank BTPN Tbk (d/h /formerly  PT Bank Sumitomo Mitsui Indonesia),
Bank of China (Hong Kong) Limited Jakarta Branch, PT Bank KEB Hana Indonesia, 
PT Bank Permata Tbk., PT Bank OCBC NISP Tbk., PT Bank China Construction 
Bank Indonesia Tbk., PT Bank CTBC Indonesia, 
PT Bank Shinhan Indonesia, dan PT Bank SBI Indonesia 8,68% 10,08%
Bank of China Ltd 8,10% 7,75%
PT Bank Negara Indonesia (Persero) Tbk, 
Bank of Tokyo Mitsubishi UFJ, Ltd, PT Bank Rakyat Indonesia (Persero) Tbk,             
PT Sarana Multi Infrastruktur (Persero), PT Bank Pembangunan Daerah Jawa Barat 
dan Banten Tbk, PT Bank Pembangunan Daerah Sumatera Selatan dan Bangka 
Belitung, PT Bank Pan Indonesia Tbk., PT Bank Pembangunan Daerah Papua, PT 
Bank ICBC Indonesia, dan PT Bank BPD Riau --  10,50%

106
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018

PT Sarana Multi Infrastruktur (Persero)
PT Bank CIMB Niaga Tbk., Bank of Tokyo Mitsubishi UFJ, Ltd, dan
PT Bank Mandiri (Persero) Tbk --  9,43%
PT Bank Mandiri (Persero) Tbk
The Bank of Tokyo-Mitsubishi UFJ, LTd., Cabang Jakarta, PT Sarana Multi 
Infrastruktur (Persero), PT Bank Central Asia Tbk, PT Bank BNP Paribas
Indonesia, PT Bank CIMB Niaga Tbk, dan PT Bank KEB Hana Indonesia  8,51% 9,91%
PT Bank BTPN Tbk (d/h /formerly  PT Bank Sumitomo Mitsui Indonesia),
PT Bank Permata Tbk., PT Bank Shinhan Indonesia, dan PT Bank Resona Perdania 8,60% 10,08%
Entitas anak/ Subsidiary Entity - WBP
PT Bank Rakyat Indonesia (Persero) Tbk 9,50% 9,75%
PT Bank Negara Indonesia (Persero) Tbk 9,50% 9,25%
PT Bank BRIsyariah Tbk 9,00% 9,00%
PT Bank ICBC Indonesia 9,25% 9,25%
PT Bank Pembangunan Daerah Banten Tbk 9,50% 9,50%
PT Bank DKI 9,50% 9,50%
Bank of Tokyo Mitsubishi UFJ, Ltd. 8,40% 9,50%
PT Bank CTBC Indonesia 8,60% 10,00%
PT Bank Tabungan Negara (Persero) Tbk 9,25% 9,00%
PT Bank Permata Tbk 9,25% 9,50%
PT Bank BCA Syariah 9,50% 9,50%
PT Bank CIMB Niaga Tbk 9,60% 9,60%
PT Bank BTPN Tbk (d/h /formerly  PT Bank Sumitomo Mitsui Indonesia) 9,30% 8,80% - 9,55%
PT Bank UOB Indonesia 9,00% --
 
Perusahaan The Company
 
1. PT Bank Mandiri (Persero) Tbk. 1. PT Bank Mandiri (Persero) Tbk.
 
Perusahaan  memperoleh  fasilitas  kredit  dari   The  Company  obtained  the  credit  facilities 
PT Bank Mandiri (Persero) Tbk sebagai berikut: from  PT Bank  Mandiri  (Persero)  Tbk  as 
follows:
   
Jenis-jenis Fasilitas/ The Facilities Batas/ Limit Jatuh Tempo/ Due date

Rp
Fasilitas Kredit (Non Cash Loan Facility )           4.500.000.000.000  14/11/2019
Fasilitas/ Facility  Supply Chain Financing  (SCF)           2.006.000.000.000  14/11/2019
Kredit Modal Kerja Transaksional 
   (Transactional Working Capital Credit)           1.765.000.000.000  14/11/2019
L/C / SKBDN (Sub limit  dari NCL/ from NCL )             500.000.000.000  14/11/2019
Trust Receipt  (Sub limit  dari NCL/ from NCL )             115.000.000.000  14/11/2019
Kredit Modal Kerja Rekening Koran
   (Current Account Working Capital Credit)               35.000.000.000  14/11/2019
Kredit Jangka Pendek (Short-Term Credit)           4.000.000.000.000  14/11/2019
 
Atas  pinjaman  tersebut  Perusahaan  dikenakan  The  loan  bears interest by  8.15%  per annum. 
bunga  8,15%  per  tahun.  Fasilitas  pinjaman  ini  The  loan  facilities  are  collateralized  and  tied 
dijamin dan diikat dengan:  with: 
   
a.  Deposito sebesar Rp 8.448.200.000 (Catatan 4).  a.  Time  deposit  amounted  to  
Rp 8,448,200,000 (Note 4). 
   
b.  3  (tiga)  bidang  tanah  berikut  bangunan  kantor  b.  3  (three)  plots  of  land  and  buildings  at 
cabang  Pekanbaru,  yang  telah  diserahkan  dan  Pekanbaru  Branch  office,  which  have 
telah  diikat  hak  tanggungan  (HT)  dengan  nilai  been  submitted  and  tied  with  guarantee 
Rp 14.075.000.000 (Catatan 16). rights  amounted  to  Rp 14,075,000,000 
(Note 16).
   

107
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
c.  Pada  tanggal  30  September  2019,  seluruh  c.  As  of  September  30,  2019,  all  amount   
tagihan  kepada  pengguna  jasa  atas  Proyek  due from customers of Bekasi – Cawang – 
Jalan Tol Bekasi – Cawang – Kampung Melayu  Kampung  Melayu  Toll  Road  Section  2A 
Seksi  2A,  Proyek  Jalan  Tol  Kayu  Agung  –  Project,  Kayu  Agung  –  Palembang  – 
Palembang  –  Betung  Paket  I,  Proyek  Jalan  Tol  Betung  Package  I    Toll  Road  Project, 
Terbanggi Besar - Pematang Panggang – Kayu  Terbanggi Besar - Pematang Panggang – 
Agung  Seksi  2B,  Proyek  Jalan  Tol  Pematang  Kayu Agung Toll Road Project Section 2B, 
Panggang  –  Kayu  Agung  Seksi  2A,  Proyek  Pematang  Panggang  –  Kayu  Agung  Toll 
Jalan  Tol  Pematang  Panggang  –  Kayu  Agung  Road  Project  Section  2A,  Pematang 
Seksi  3,  Proyek  Jalan  Tol  Pematang  Panggang  Panggang  –  Kayu  Agung  Toll  Road 
–  Kayu  Agung  Seksi  1,  Proyek  Jalan  Tol  Project  Section 3,  Pematang Panggang – 
Pematang  Panggang  –  Kayu  Agung  Seksi  4A  Kayu  Agung  Toll  Road  Project  Section  1, 
dijaminkan atas utang bank (Catatan 5).   Pematang  Panggang  –  Kayu  Agung  Toll 
Road Project Section 4A  of were used as 
collateral bank (Note 5). 

Perjanjian ini juga mencakup batasan-batasan yang  This  agreement  includes  restrictions  which   


tidak  diperkenankan  dilakukan  oleh  Perusahaan  the  Company  is  not  allowed  to  do  certain 
tanpa persetujuan tertulis terlebih dahulu dari Bank  actions  without  the  prior  written  consent  by   
antara  lain:  memindah  tangankan  barang  jaminan;  the Bank, such as: transfer the collateral; bind 
mengikat  diri  sebagai  penjamin  hutang  atau  itself  as  guarantor  of  the  debt  or  pledge  
menjaminkan  harta  kekayaan  Perusahaan  yang  the Company’s assets that have been pledged 
telah  dijaminkan  kepada  pihak  lain;  menjaga  rasio  to  another  party;  maintain  the  financial  ratios 
keuangan  aset  tetap  yang  akan  diperoleh/dibeli  of  fixed  assets  to  be  acquired/  purchased  by 
oleh  Perusahaan  di  kemudian  hari,  maka  akan  the  Company  in  the  future,  it  will  be  used  as 
dijadikan  agunan  kredit  di  PT  Bank  Mandiri  collateral  for  loans  in  PT  Bank  Mandiri 
(Persero)  Tbk,  Perusahaan  akan  memprioritaskan  (Persero)  Tbk,  the  Company  will  prioritize  
kepada  PT  Bank  Mandiri  (Persero)  Tbk  dan  PT  Bank  Mandiri  (Persero)  Tbk  and  its 
afiliasinya  untuk  menjadi  arranger,  underwriter  dan  affiliates  to  be  an  arranger,  underwriter  and 
lain-lain  dalam  hal  Perusahaan  melakukan  others  in  terms  of  the  Company’s  corporate 
corporate action dalam rangka fund raising di dalam  action in order to do fund raising internally.
negeri.
   
Perusahaan  diwajibkan  untuk  mempertahankan  The  Company  should  maintain  the  following 
rasio  keuangan  sebagai  berikut:  current  ratio  financial  ratios:  current  ratio  at  least  1  (one) 
minimal  1 (satu)  kali,  debt  to  equity  ratio  maksimal   time,  debt  to  equity  ratio  of  a  maximum  
3  (tiga)  kali  dan  debt  service  coverage  minimal  3 (three) times and debt service coverage of at 
100%.  Pemenuhan  pembatasan  pinjaman  bank  least  100%.  The  fulfillment  of  bank  lending 
dilaporkan oleh Perusahaan setiap akhir tahun dan  restrictions will be reported by the Company at 
akan dievaluasi oleh Bank. the  end  of  the  year  and  will  be  evaluated  by 
the Bank.
 
Pada  tanggal  30  September  2019  dan   As  of September 30, 2019 and December 31,  
31  Desember  2018  saldo  pinjaman  Perusahaan  2018  the  Company’s  loan  balance  to  
kepada  PT  Bank  Mandiri  (Persero)  Tbk   PT  Bank  Mandiri  (Persero)  Tbk  
masing-masing sebesar Rp 5.487.020.615.908 and   amounted  to  Rp  5,487,020,615,908  and  
Rp 4.789.214.194.112.  Rp 4,789,214,194,112, respectively.
 
2. PT Bank Negara Indonesia (Persero) Tbk. 2. PT Bank Negara Indonesia (Persero) Tbk.
     
Perusahaan  memperoleh  fasilitas  kredit  dari    The Company obtained the credit facilities from 
PT  Bank  Negara  Indonesia  (Persero)  Tbk  sebagai  PT  Bank  Negara  Indonesia  (Persero)  Tbk  as 
berikut:  follows: 
     
a.  Kredit  Modal  Kerja  (KMK)  Revolving    a.  Revolving Working Capital Loan (WCL) of 
Rp 200.000.000.000. Rp 200,000,000,000. 
b.  Kredit  Modal  Transaksional    b.  Transactional  Capital  Loan  of 
Rp 4.450.000.000.000.  Rp 4,450,000,000,000. 
c.  Kredit  Modal  Kerja  Supply  Chain  Financing    c.  Supply  Chain  Financing  (SCF)  Working 
(SCF) Rp 2.775.000.000.000.  Capital Loan of Rp 2,775,000,000,000. 
d.  Bank Garansi Rp 1.105.000.000.000.    d.  Bank Guarantee of Rp 1.105,000,000,000. 
e.  Letter  of  Credit  (L/C)  atau  SKBDN  sebesar    e.  Letter  of  Credit  (L/C)  or  SKBDN  of 
Rp 240.000.000.000.  Rp 240,000,000,000. 
 

108
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Berdasarkan  surat  No.  BIN/2.2/120/R  tanggal   According  to  letter  No.  BIN/2.2/120/R  dated 
18  Maret  2019,  jangka  waktu  pinjaman  sejak  March 18, 2019, the term of loan is from March 
tanggal  27  Maret  2019  dan  jatuh  tempo  26  Maret  27,  2019  and  will  be  due  on  March  26,  2020 
2020  dan  surat  No.  BIN/2.2/261/R  tanggal   and letter No. BIN/2.2/261/R dated September 
25 September 2019 perihal Persetujuan Tambahan  25,  2019  concerning  Agreement  Additional 
Fasilitas  Kredit  Modal  Kerja  Bridging  yang  berlaku  Transactional  Working  Capital  Credit  Bridging 
sampai  dengan  30  Nopember  2020.  Fasilitas  Facilities  which  are  valid  until  November  30, 
pinjaman ini dijamin dan diikat dengan:  2020.  The  loan  facilities  are  secured  and 
bounded with: 
   
a.  Persediaan yang telah diikat akta fidusia No. 5  a.  Inventory which has been tied by fiduciary 
tanggal 13 Agustus 1998 dan telah didaftarkan  deed  No. 5  dated  August  13,  1998  and 
di  Kantor  Pendaftaran  Fidusia;  Sertifikat  was  registered  at  the  Fiduciary 
Jaminan  Fidusia  No.  C2-4831  HT.04.06.  Registration  Office;  the  Fiduciary 
TH.2001/NTSD  tanggal  26 Januari  2001  Certificate  No.  C2-4831  HT.04.06.TH. 
senilai Rp 8.268.049.363 (Catatan 9). 2001/NTSD  dated  January 26,  2001 
amounted to Rp 8,268,049,363 (Note 9).
   
b.  Satu  bidang  tanah  SHGB  No.  724  tanggal  b.  A plot of land SHGB No. 724 dated March 
29 Maret  1988  sampai  dengan  1  Desember  29, 1988 until December 1, 2027, an area 
2027  seluas  2.098  m2  terletak  di  Kelurahan  of  2,098  sqm  located  at  Kelurahan 
Cipinang  Cempedak,  Kecamatan  Jatinegara,  Cipinang  Cempedak,  Kecamatan 
Jakarta  Timur,  atas  nama  Perusahaan  senilai  Jatinegara,  East  Jakarta  on  behalf  of  
Rp  1.500.000.000  sesuai  dengan  SHT  the  Company  amounted  to 
No. 397/T/1988,  senilai  Rp  31.000.000.000  Rp 1,500,000,000  according  to  SHT 
sesuai  dengan  SHT.II  No. 408/2004,  senilai  No. 397/T/1988,  amounted  to 
Rp  48.320.400.000  sesuai  dengan  SHT  III  Rp 31,000,000,000  according  to  SHT.II 
No. 06386/2014 dan senilai  Rp 11.120.940.000  No. 408/2004,  amounted  to 
dimana  SHT  IV  sedang  dalam  proses  Rp 48,320,400,000  according  to  SHT  III 
(Catatan 16). No. 06386/2014  and  Rp  11,120,940,000 
while SHT IV still in process (Note 16).
 
c.  Satu  bidang  tanah  SHGB  No.  38,  tanggal  c.  A plot of land with SHGB No. 38, April 21, 
21 April  2003  sampai  dengan  20  April  2022,  2003 until April 20, 2022, an area of 1,332 
seluas  1.332  m2,  terletak  di  Jl.  Langko  sqm,  located  at  Jl. Langko  Kelurahan 
Kelurahan  Ampenan  Selatan,  Kecamatan  Ampenan  Selatan,  Kecamatan  Ampenan, 
Ampenan,  Mataram,  Nusa  Tenggara  Barat,  Mataram, West Nusa Tenggara, on behalf 
atas  nama  Perusahaan  Cabang  NTB  senilai  of the Company NTB Branch amounted to 
Rp 1.332.000.000  sesuai  dengan  SHT.I  Rp 1,332,000,000  according  to  SHT.I 
No. 687/2007  (Catatan  16)  dan  senilai  No. 687/2007  (Note  16)  and  amounted 
Rp 1.860.010.000  dimana  SHT  II  sedang  Rp 1,860,010,000  while  SHT  II  still  in 
dalam proses. process.
   
d.  Satu  bidang  tanah  SHGB  No.  2001  tanggal   d.  A plot of land with SHGB No. 2001 dated 
1 Juni 2006 sampai dengan tanggal 1 Januari  June 1, 2006 until on January 1, 2026, an 
2026,  seluas  5.798  m2,  terletak  di  Kelurahan  area  of  5,798  sqm,  located  at  Kelurahan 
Kuta  Alam,  Banda  Aceh,  Aceh,  atas  nama  Kuta  Alam,  Banda  Aceh,  Aceh,  on  behalf 
Perusahaan  senilai  Rp 5.191.600.000  sesuai  of  the  Company  amounted  to 
dengan  SHT  I  No. 323  (Catatan 16)  dan   Rp 5,191,600,000  according  to  SHT  I  
senilai  Rp 9.779.660.000  sesuai  SHT  II  No.  323  (Note  16)  and  amounted 
No. 1375/2015. Rp 9,779,660,000  according  to  SHT  II 
No. 1375/2015.
   
e.  Satu  bidang  tanah  SHGB  No.  4   e.  A  plot  of  land  with  SHGB  No.  4  dated 
tanggal  10 Nopember  1998  sampai  dengan  November  10,  1998  until  December 19, 
19 Desember  2028  seluas  2.511  m2,  terletak  2028  an  area  of  2,511  sqm,  located  at 
di  Desa/Kelurahan  Betung-Tebal,  Kecamatan  Desa/Kelurahan  Betung-Tebal, 
Lubuk-Begalung,  Padang,  Sumatera  Barat,  Kecamatan  Lubuk-Begalung,  Padang, 
atas  nama  Perusahaan  senilai  West  Sumatera,  on  behalf  of  
Rp 651.430.000  (Catatan  16)  dan  senilai  the  Company  amounted  to 
Rp 6.321.020.000  dimana  SHT  II  sedang  Rp 651,430,000  (Note  16)  and  amounted 
dalam proses. Rp 6,321,020,000  while  SHT  II  still  in 
process.

109
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
f.  Satu  bidang  tanah  SHGB  No.  7  tanggal  f.  A  plot  of  land  with  SHGB  No.  7  dated 
10 Pebruari  1993  sampai  dengan  7  Pebruari  February 10, 1993 until February 7, 2013, 
2013  seluas  806  m2,  terletak  di  Kelurahan  an area of 806 sqm, located at Kelurahan 
Belakanolo,  Kecamatan  Padang  Barat,  Belakanolo,  Kecamatan  Padang  Barat, 
Padang,  Sumatera  Barat,  atas  nama  Padang, West Sumatera, on behalf of the 
Perusahaan  senilai  Rp  1.270.880.000  sesuai  Company  amounted  to  Rp 1,270,880,000 
dengan  SHT  I  No.  3129/2001,  senilai  according  to  SHT  I  No. 3129/2001, 
Rp 460.020.000  sesuai  dengan  SHT  II  amounted to Rp 460,020,000 according to 
No. 1151/2007.  SHGB  tersebut  telah  SHT  II  No.  1151/2007.  The  land  right 
diperpanjang sampai  dengan 7 Pebruari  2033  (SHGB)  has  been  extended  until  
dan  senilai  Rp  3.474.910.000  sesuai  SHT  III  February  7,  2033  and  amounted  to  
No. 1846/2016 (Catatan 16). Rp 3,474,910,000 according to SHT III No 
1846/2016 (Note 16). 
 
g.  Satu  bidang  tanah  SHGB  No.  436  tanggal  g.  A  plot  of  land  with  SHGB  No. 436  dated 
10 Maret  1998  sampai  dengan  19  Juni  2032,  March  10,  1998  until  June 19,  2032,  an 
seluas  1.004  m2,  terletak  di  Desa  Sungai  area  of  1,004  sqm,  located  at  Desa 
Raya,  Pontianak,  Kalimantan  Barat,  atas  Sungai  Raya,  Pontianak,  West 
nama  Perusahaan  senilai  Rp 464.850.000  Kalimantan,  on  behalf  of  the  Company 
sesuai  dengan  SHT  I  No. 356/2001,  senilai  amounted to  Rp 464,850,000 according to 
Rp 747.850.000  sesuai  dengan  SHT  II  SHT  I  No. 356/2001,  amounted  to 
No. 169/2007  dan  senilai  Rp  3.595.942.000  Rp 747,850,000  according  to  SHT  II 
sesuai  dengan  SHT  III  No.  36/2016  No. 169/2007,  and  amounted  to 
(Catatan 16). Rp 3,595,942,000  according  to  SHT  III 
No. 36/2016 (Note 16). 
   
h.  Satu  bidang  tanah  SHGB  No.  1085  tanggal  h.  A  plot  of  land  with  SHGB  No. 1085  dated 
18 Desember  2006  sampai  dengan  December  18,  2006  until  November  23, 
23 Nopember  2026,  seluas  1.404  m2,  terletak  2026,  an  area  of  1,404  sqm,  located  at 
di  Kelurahan  Jemur  Wonosari,  Kecamatan  Kelurahan  Jemur  Wonosari,  Kecamatan 
Wonocolo,  Surabaya,  Jawa  Timur,  atas  nama  Wonocolo,  Surabaya,  East  Java,  on 
Perusahaan  senilai  Rp  2.665.700.000  sesuai  behalf  of  the  Company  amounted  to 
dengan  SHT  I  No. 2952/2007  dan  senilai  Rp 2,665,700,000  according  to  SHT  I 
Rp 3.595.940.000  sesuai  SHT  III  No. 2952/2007  and  amounted  
No. 00621/2016  tanggal  28  Januari  2016  Rp  3,595,940,000  according  to  SHT  III 
(Catatan 16). No. 00621/016  dated  January  28,  2016 
(Note 16). 

i.  Satu  bidang  tanah  SHGB  No.  82  tanggal  i.  A  plot  of  land  with  SHGB  No. 82  dated 
20 Oktober  1988  sampai  dengan  13  April  October  20,  1988  to  April  13,  2028,  an 
2028,  seluas  2.013  m2,  terletak  di  Kelurahan  area  of  2,013  sqm,  located  at  Kelurahan 
Kalirungkut, Kota Surabaya, Jawa Timur,  atas  Kalirungkut, Surabaya City, East Java, on 
nama  Perusahaan  senilai  Rp 2.027.710.000  behalf  of  the  Company  amounted  to 
sesuai  dengan  SHT  I  No. 4772/2001,  senilai   Rp 2,027,710,000  according  to  SHT  I 
Rp  2.474.390.000  sesuai  dengan  SHT  II   No. 4772/2001,  amounted  to 
No. 2948/2007 dan senilai Rp 10.571.030.000  Rp 2,474,390,000  according  to  SHT  II 
dimana SHT III sedang dalam proses (Catatan  No. 2948/2007  and  amounted  to 
16). Rp 10.571.030.000  while  SHT  III  still  in 
process (Note 16). 

j.  Satu  bidang  tanah  SHGB  No.  2  tanggal  j.  A  plot  of  land  with  SHGB  No.  2  dated 
25 Juni  1997  sampai  dengan  25  Juni  2017,  June  25,  1997  until  June  25,  2017,  an 
seluas  1.000  m2,  terletak  di  Kelurahan  Pasir  area  of  1,000  sqm,  located  at  Kelurahan 
Panjang,  Kecamatan  Kelapa  Lima,  Kota  Pasir  Panjang,  Kecamatan  Kelapa  Lima, 
Kupang,  Nusa  Tenggara  Timur,  atas  nama  Kupang  City,  East  Nusa  Tenggara,  on 
Perusahaan  senilai  Rp 402.860.000  sesuai  behalf  of  the  Company  amounted  to 
dengan  SHT  I  No. 390/2001  dan  senilai  Rp 402,860,000  according  to  SHT  I 
Rp 636.540.000  sesuai  dengan  SHT  II  No. 390/2001  and  amount  to 
No. 239/2007 senilai Rp 3.085.070.000 sesuai  Rp 636,540,000  according  to  SHT  II 
dengan SHT III No. 1387/2015 (Catatan 16). No. 239/2007  amounted  to 
Rp 3,085,070,000  according  to  SHT  III 
No. 1387/2015 (Note 16).
   

110
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
k.  Satu  bidang  tanah  SHGB  No.  24  tanggal  k.  A  plot  of  land  with  SHGB  No.  24  dated 
24 Oktober  1997  sampai  dengan  24  Oktober  October 24,  1997  until  October  24,  2017, 
2017,  seluas  595  m2,  terletak  di  Kelurahan  an area of 595 sqm, located at Kelurahan 
Oesapa,  Kecamatan  Kelapa  Lima,  Kota  Oesapa,  Kecamatan  Kelapa  Lima, 
Kupang,  Nusa  Tenggara  Timur,  atas  nama  Kupang  City,  East  Nusa  Tenggara,  on 
Perusahaan  senilai  Rp 49.260.000  sesuai  behalf  of  the  Company  amounted  to 
dengan  SHT  I  No. 374/2001  dan  senilai  Rp 49,260,000  according  to  SHT  I 
Rp 39.740.000  sesuai  dengan  SHT  II  No. 374/2001  and  amounted  to 
No. 240/2007 (Catatan 16). Rp 39,740,000  according  to  SHT  II 
No. 240/2007 (Note 16).

l.  Satu  bidang  tanah  SHGB  No.  13  tanggal  l.  A  plot  of  land  with  SHGB  No. 13  dated 
22 Juli  1993  sampai  dengan  22  Juli  2023,  July 22, 1993 until July 22, 2023, an area 
seluas  4.830  m2,  terletak  di  Jl.  Eltari  II  of  4,830  sqm,  located  at  Jl.  Eltari  II, 
Kecamatan  Kupang  Tengah,  Kupang,  Nusa  Kecamatan  Kupang  Tengah,  Kupang, 
Tenggara  Timur,  atas  nama  Perusahaan  East  Nusa  Tenggara,  on  behalf  of  
senilai  Rp 457.590.000  sesuai  dengan  SHT  I  the  Company  amounted  to 
No. 375/2001 (Catatan 16).  Rp 457,590,000  according  to  SHT  I 
No. 375/2001 (Note 16). 
   
m.  Satu  bidang  tanah  SHGB  No.  14  tanggal  m.  A  plot  of  land  with  SHGB  No. 14  dated 
22 Juli  1993  sampai  dengan  22  April  2023,  July 22, 1993 until April 22, 2023, an area 
seluas  4.800  m2,  terletak  di  Jl.  Eltari  II  of  4,800  sqm,  located  at  Jl.  Eltari  II, 
Kecamatan  Kupang  Tengah,  Kupang,  Nusa  Kecamatan  Kupang  Tengah,  Kupang, 
Tenggara  Timur,  atas  nama  Perusahaan  East  Nusa  Tenggara,  on  behalf  of  
senilai  Rp 288.000.000  sesuai  dengan  SHT  I   the  Company  amounted  to 
No.  375/2001,  senilai  Rp 602.410.000  sesuai  Rp 228,000,000  according  to  SHT  I 
dengan  SHT  II  No. 238/2007  dan  senilai  No. 375/2001,  amounted  to 
Rp 7.828.880.000  dimana  SHT  III  sedang  Rp 602,410,000  according  to  SHT  II 
dalam proses (Catatan 16).  No. 238/2007  and  amounted 
Rp 7,828,880,000  while  SHT  III  still  in 
process (Note 16). 
   
n.  Satu  bidang  tanah  SHGB  No.  24  tanggal   n.  A  plot  of  land  with  SHGB  No.  24  dated 
11  Juni  1993  sampai  dengan  25  Mei  2013,  June 11, 1993 until May 25, 2013, an area 
seluas  276  m2,  terletak  di  Kelurahan  Tikala  of  276  sqm,  located  at  Kelurahan  Tikala 
Ares,  Kecamatan  Wenang,  Kota  Manado,  Ares, Kecamatan Wenang, Manado, North 
Sulawesi Utara, atas nama Perusahaan senilai  Sulawesi,  on  behalf  of  
Rp 263.530.000,  sesuai  dengan  SHT  I  the  Company  amounted  to 
No. 737/2001  dan  senilai  Rp  121.670.000,  Rp 263,530,000  according  to  SHT  I 
sesuai  dengan  SHT  II  No.  667/2007.  SHGB  No. 737/2001  and  amounted  to 
tersebut  telah  diperpanjang  sampai  dengan  Rp 121,670,000  according  to  SHT  II 
25 Mei 2033 (Catatan 16).  No. 667/2007.  The land  right (SHGB)  has 
been  extended  until  May  25,  2033  (Note 
16). 
   
o.  Satu  bidang  tanah  SHGB  No.  1  tanggal   o.  A  plot  of  land  with  SHGB  No.  1  dated 
7  Januari  1992  sampai  dengan  28  Desember  January 7, 1992 until December 28, 2020, 
2020,  seluas  4.040  m2,  terletak  di  Desa  an  area  of  4,040  sqm,  located  at  Desa 
Cileunyi  Wetan,  Kecamatan  Cileunyi,  Cileunyi  Wetan,  Kecamatan  Cileunyi, 
Kabupaten  Bandung,  Jawa  Barat,  atas  nama  Kabupaten  Bandung,  West  Java,  on 
Perusahaan  senilai  Rp 1.516.520.000,  sesuai  behalf  of  the  Company  amounted  to 
dengan  SHT  I  No. 2927/2001,  senilai  Rp 1,516,520,000  according  to  SHT  I 
Rp 994.180.000  sesuai  dengan  SHT  II  No. 2927/2001,  amounted  to 
No. 1613/2007  dan  senilai  Rp 3.182.880.000  Rp 994,180,000  according  to  SHT  II 
sesuai dengan SHT III No. 10710/2015. Tanah  No. 1613/2007  and  amounted  to 
yang  dijaminkan  termasuk  bangunan  dan  Rp 3,182,880,000  according  to  SHT  III 
segala  sesuatu  yang  berada  diatas  tanah  No.  10710/2015.  Land  which  is  pledged 
tersebut  baik  yang  telah  ada  maupun  yang  as  collateral  consisted  of  buildings  and 
akan ada (Catatan 16).  related things already existing in the land, 
or to will be exist there (Note 16). 

111
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
p.  Satu  bidang  tanah  SHGB  No.  30  tanggal  p.  A  plot  of  land  with  SHGB  No. 30  dated 
26 Januari  2007  sampai  dengan  26  Januari  January  26,  2007  until  January  26,  2027, 
2027,  seluas  1.250  m2,  terletak  di  Kelurahan  an  area  of  1,250  sqm,  located  at 
Sumerta,  Kecamatan  Denpasar  Timur,  Bali,  Kelurahan Sumerta, Kecamatan Denpasar 
atas  nama  Perusahaan  senilai  Timur,  Bali,  on  behalf  of  
Rp 3.404.000.000  sesuai  dengan  SHT  I  the  Company  amounted  to 
No. 2012/2007  senilai  Rp 18.705.400.000  Rp 3,404,000,000  according  to  SHT  I 
dimana  SHT  II  sedang  dalam  proses.  Tanah  No. 2012/2007  amounted  to 
yang  dijaminkan  termasuk  bangunan  dan  Rp 18,705,400,000  while  SHT  II  still  in 
segala  sesuatu  yang  berada  di  atas  tanah  process.  Land  which  is  pledged  as 
tersebut,  baik  yang  telah  ada  maupun  yang  collateral  consisted  of  buildings  and 
akan ada (Catatan 16).  related things already existing in the land, 
or to will be exist there (Note 16). 
   
q.  Satu  bidang  tanah  SHGB  No.  1  tanggal   q.  A  plot  of  land  with  SHGB  No.  1  dated 
13  Nopember  1987  sampai  dengan  November  13,  1987  until  October  13, 
13 Oktober  2027,  seluas  1.905  m2,  terletak  di   2027, an area of 1,905 sqm, located at Jl. 
Jl.  P.  Antasari  No.  1/4,  Tanjung  Baru,  Bandar  P. Antasari No. 1/4, Tanjung Baru, Bandar 
Lampung  atas  nama  Perusahaan  senilai  Lampung,  on  behalf  of  the  Company 
Rp 30.000.000 sesuai dengan S. Hip No. 3181  amounted  to  Rp 30,000,000  according  to 
tanggal  13  September  1989,  senilai  S.  Hip  No. 3181  dated  September  13, 
Rp 2.222.100.000  sesuai  dengan  SHT  II  1989,  amounted  to  Rp 2,222,100,000 
No. 01057/2007 dan senilai Rp 3.642.670.000  according  to  SHT  II  No. 01057/2007  and 
sesuai  dengan  SHT  III  No.  02119/2016.  amounted  to  Rp 3,642,670,000  according 
(Catatan 16).  to SHT III No. 02119/2016 (Note 16). 
   
r.  Kendaraan  bermotor  yang  terdiri  dari  1  (satu)  r.  Vehicles  consisting  of  1  (one)  unit  VW 
unit VW Caravelle 2.0 tahun 2012, yang diikat  Caravelle  2.0  year  2012  tied  by  fiduciary 
fidusia  sesuai  Akta  Pemberian  Jaminan  in  accordance  to  Fiduciary  Guarantee 
Fidusia  Atas  Kendaraan  No.  W.10.00426020.  Deed No. W.10.00426020.AH.05.01 dated 
AH.05.01  tanggal  26  Pebruari  2012  senilai   February  26,  2012  amounted  to  
Rp 620.000.000 (Catatan 16).  Rp 620,000,000 (Note 16). 

Pada  tanggal  30  September  2019, seluruh  tagihan    As  of  September  30,  2019,  all  amount  due 
kepada pengguna jasa proyek Pembangunan Jalan  from  customers  of  the  Constructions  of 
Tol  Cibitung  –  Cilincing,  Pembangunan  Koneksi  Cibitung  -  Cilincing  Toll  Road  project,  
Jalan  Tol  Bekasi  –  Cawang  –  Kampung  Melayu  the  Constructions  of  Connection  of  Bekasi  – 
dengan  Tol  Wiyoto  Wiyono,  Bendungan  Way  Cawang  –  Kampung  Melayu  Toll  Road  to 
Sekampung  di  Kabupaten  Pringsewu  (Paket  2),  Wiyoto  Wiyono  Toll  Road  project,  Way 
Bendungan  Leuwikeris  Paket  2,  SPAM  Aceh,  Sekampung  Dam  at  Pringsewu  District 
Bendungan  Jlantah,  Light  Rail  Transit  di  Sumatera  (Package  2),  Leuwikeris  Dam  Package  2, 
Selatan,  dan  Jalan  Tol  Terbanggi  Besar  -  Kayu  SPAM Aceh, Jlantah Dam, Light Rail Transit at 
Agung VGF Japek digunakan sebagai jaminan atas  South Sumatera, and Terbanggi Besar - Kayu 
utang  bank  PT  Bank  Negara  Indonesia  (Persero)  Agung  VGF  Japek  are  used  as  collateral  for 
Tbk (Catatan 5). PT  Bank  Negara  Indonesia  (Persero)  Tbk 
(Note 5). 
 
Perjanjian ini juga mencakup batasan-batasan yang    Under  the  agreement  the  Company  is  not 
tidak  diperkenankan  dilakukan  oleh  Perusahaan  allowed  to  do  certain  actions without the  prior 
tanpa persetujuan tertulis terlebih dahulu dari Bank  written  consent  by  the  Bank  such  as;  to 
antara  lain  melakukan  perubahan  kegiatan  usaha;  change  business  activities;  sell  or  transfer  
menjual  atau  memindahkan  hak  atau  mengalihkan  the  rights  or  transfer  all  or  part  of  
seluruh  atau  sebagian  kekayaan/aset  milik  dalam  the  property/assets  owned  in  a  single 
satu transaksi   atau    dalam   beberapa   transaksi  transaction  or  in  a  transaction  except  selling  
kecuali  menjual  atau  mengalihkan  aset  kecuali  or    transfer      assets  except  one  that  is  arm's 
yang  bersifat  arm’s  length;  menjual  atau  length;  sell  or  transfer  assets  in  exchange  for 
mengalihkan  aset  sebagai  ganti  atau  digantikan  or  replacement  of  other  assets  that  are 
aset  lainnya  yang  sebanding  atau  lebih  baik  tipe  comparable  or  better  type  of  nature  and 
sifat  dan  kualitasnya;  menjual  atau  mengalihkan  quality; sell or transfer assets in the context of 
aset  dalam  rangka  pelaksanaan  reorganisasi  oleh  the  reorganization  by  the  Government  of 
Pemerintah  Republik  Indonesia  sepanjang  Republic  Indonesia  through  the  sale  of  these 
penjualan  aset  tersebut  tidak  mempunyai  akibat  assets  do  not  have  material  effect;  done  with 
material;  dilakukan  dengan  syarat  akan  menjadi  requirement  will  be  the  surviving  legal  entity; 
 

112
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
badan hukum yang bertahan (surviving legal entity);  making  amendments  to  it  may  be  caused  by 
melakukan  perubahan  anggaran  dasar  yang  dapat  due  to  the  material;  filed  a  petition  for 
menimbulkan  akibat  material;  mengajukan  bankruptcy  or  suspension  of  payment 
permohonan  pailit  atau  permohonan  penundaan  obligation payable to the relevant authorities. 
kewajiban pembayaran utang kepada instansi yang 
berwenang.    
   
Perusahaan  diwajibkan  untuk  mempertahankan  The  Company  should  maintain  the  following 
rasio  keuangan  sebagai  berikut:  current  ratio  financial  ratios:  current  ratio  at  least  1  (one), 
minimal 1 (satu) kali, debt to equity ratio maksimal 3  debt  to  equity  ratio  of  a  maximum  3  (three) 
(tiga) kali dan debt service coverage minimal 100%.  and  debt  service  coverage  of  at  least  100%.       
Pemenuhan pembatasan pinjaman bank dilaporkan  The  fulfillment  of  bank  lending  restrictions  will 
oleh  Perusahaan  setiap  akhir  tahun  dan  akan  be  reported  by  the  Company  at  the  end  of        
dievaluasi oleh Bank.  the year and will be evaluated by the Bank. 
 
Pada  tanggal  30  September  2019  dan   As  of  September 30, 2019 and December 31, 
31 Desember 2018 saldo pinjaman Perusahaan ke  2018  the  balance  of  loan  to  PT  Bank  
PT  Bank  Negara  Indonesia  (Persero)  Tbk  masing- Negara  Indonesia  (Persero)  Tbk  
masing  sebesar  Rp  2.821.979.209.926  dan   amounted  to  Rp 2,821,979,209,926  and 
Rp 2.148.464.882.826.  Rp 2,148,464,882,826, respectively.  

3. PT Bank Rakyat Indonesia (Persero) Tbk 3. PT Bank Rakyat Indonesia (Persero) Tbk 
 
Perusahaan  memperoleh  fasilitas  kredit  dari    The  Company  obtained  the  credit  facilities 
PT  Bank  Rakyat  Indonesia  (Persero)  Tbk  sebagai  from PT Bank Rakyat Indonesia (Persero) Tbk 
berikut:  as follows: 
     
a.  Kredit  modal  kerja  konstruksi  sebesar  a.  Working  capital  credit  facility  amounted  to 
Rp 1.800.000.000.000  sesuai  dengan  surat   Rp  1,800,000,000,000  in  accordance  to 
No.  R.II.161-OPK/DKD/06/2018  dari  PT  Bank  letter  No.  R.II.161-OPK/DKD/06/2018  from 
Rakyat Indonesia (Persero) Tbk tanggal 25 Juni  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
2018. Fasilitas tersebut dapat digunakan sampai  dated  June  25,  2018.  The  facility  may  be 
dengan 10 Juni 2020.  used up to June 10, 2020. 
     
b.  Fasilitas  Pinjaman  Jangka  Pendek  sebesar                        
b.  Short-Term  Loan  facility  amounted  to        
Rp  1.000.000.000.000  bersifat  interchangeable  Rp  1,000,000,000,000  is  interchangeable 
dengan  fasilitas  KMKK  sesuai  dengan  surat   with  KMKK  facility  in  accordance  to  letter 
No.  R.II.227-OPK/DKD/08/2019  dari  PT  Bank  No.  R.II.227-OPK/DKD/08/2019  from  
Rakyat  Indonesia  (Persero)  Tbk  tanggal  21  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
Agustus  2018.  Fasilitas  tersebut  dapat  dated August 21, 2018. The facility may be 
digunakan sampai dengan 10 Juni 2020.  used until June 10, 2020. 
   
c.  Fasilitas  bank  garansi  sebesar    c.  Bank  guarantee  facility  amounted  to          
Rp 4.500.000.000.000  sesuai  dengan  surat   Rp  4,500,000,000,000  in  accordance  to 
No.  R.II.227-OPK/DKD/08/2019  dari  PT  Bank  letter  No.  R.II.227-OPK/DKD/08/2019  from 
Rakyat  Indonesia  (Persero)  Tbk  tanggal   PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
21  Agustus  2018.  Fasilitas  tersebut  dapat  dated August 21, 2018.  The facility can be 
digunakan sampai dengan 10 Juni 2020.  used until June 10, 2020. 
     
d.  Fasilitas  SCF  A/P  1  sebesar    d.  The  SCF  A/P  1  facility  amounted  to  
Rp  500.000.000.000  interchangeable  dengan  Rp  500,000,000,000  is  interchangeable 
fasilitas  KMK  Konstruksi  sesuai  dengan  surat  with  KMK  Konstruksi  facility  in  accordance 
No.  R.II.227-OPK/DKD/08/2019  dari  PT  Bank  with  letter  No.  R.II.227-OPK/DKD/08/2019 
Rakyat  Indonesia  (Persero)  Tbk  tanggal   from  PT  Bank  Rakyat  Indonesia  (Persero) 
21  Agustus  2018.  Fasilitas  tersebut  dapat  Tbk dated August 21, 2018. The facility can 
digunakan sampai dengan 10 Juni 2020.  be used up to June 10, 2020. 
     
e.  Fasilitas  SCF  A/P  2  sebesar  e.  The  SCF  A/P  2  facility  amounted  to            
Rp 1.200.000.000.000  sesuai  dengan  surat   Rp  1,200,000,000,000  in  accordance  
No.  R.II.227-OPK/DKD/08/2019  dari  PT  Bank  to  letter  No.  R.II.227-OPK/DKD/08/2019 
Rakyat  Indonesia  (Persero)  Tbk  tanggal   from  PT  Bank  Rakyat  Indonesia  (Persero)  
21  Agustus  2018.  Fasilitas  tersebut  dapat  Tbk  dated  August  21,  2018.  The  facility 
digunakan sampai dengan 10 Juni 2020.  may be used up to June 10, 2020. 

113
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Fasilitas  pinjaman  ini  dijamin  dan  diikat  dengan  Loan facilities are collateralized and tied with a 
sebidang  tanah  dengan  SHGB  No.  655  dengan  piece  of  land  with  land  right  (SHGB)  No.  655 
masa  berlaku  dari  tanggal  7  Januari  1992  sampai  dated  January  7,  1992  until  December 28, 
dengan  28 Desember  2020  yang  telah  diikat  hak  2020  that  have  been  tied  with  its  guraantee 
tanggungan dengan nilai Rp 16.186.000.000.  rights amounted to Rp 16,186,000,000. 
   
Perjanjian  ini  mencakup  batasan-batasan  yang  Under  the  agreement,  the  Company  is  not 
tidak  diperkenankan  dilakukan  oleh  Perusahaan  allowed  to  do  certain  actions without the  prior 
tanpa  persetujuan  tertulis  dari  Bank  antara  lain:  written  consent  by  the  Bank  such  as:  filed  for 
mengajukan  pernyataan  kepailitan  kepada  bankruptcy  to  the  court,  leased  assets  as 
pengadilan,  menyewakan  aset  yang  dijaminkan  collateral  to  the  bank;  pay  interest  on 
kepada  bank;  melakukan  pembayaran  bunga  atas  shareholder  loans.  Under  the  agreement,         
pinjaman  pemegang  saham.  Perusahaan  the Company should maintain: current ratio at 
diwajibkan  untuk  mempertahankan  current  ratio  least  1  (one).  The  fulfillment  of  bank  lending 
minimal  1  (satu)  kali.  Pemenuhan  pembatasan  restrictions will be reported by the Company at 
pinjaman  bank  dilaporkan  oleh  Perusahaan  setiap  the  end  of  the  year  and  will  be  evaluated  by 
akhir tahun dan akan dievaluasi oleh Bank.  the Bank. 
   
Pada  tanggal  30  September  2019, seluruh  tagihan  As  of  September  30,  2019,  all  amount  due 
kepada  pengguna  jasa  atas  proyek  Tol  Medan  from  customers  of  Medan  Kualanamu  Tebing 
Kualanamu Tebing Tinggi Seksi 6, Tol Solo - Ngawi  Tinggi  Section  6  Toll  Road  Project,  Solo  – 
Paket  2,  Pembangunan  Teraskita  Hotel  Makasar,  Ngawi Toll Road Project Package 2, Teraskita 
Perluasan  Bandara  Depati  Amir,  Pembangunan  Hotel  Makassar  Construction,  Depati  Amir 
Apartemen  Solterra,  Pembangunan  Tol  Becakayu  Airport  Expansion,  Construction  of  Solterra 
Seksi 2A Ujung, Pembangunan Tol Ciawi Sukabumi  Apartments,  the  Constructions  of  Becakayu 
Seksi  4  dan  Proyek  Renovasi  Masjid  Istiqlal,  Toll Road Section 2A Ujung, the Constructions 
digunakan  sebagai  jaminan  atas  utang  pada   of  Ciawi  Sukabumi  Toll  Road  Section  4  and 
PT  Bank  Rakyat  Indonesia  (Persero)  Tbk  (Catatan  Istiqla  Mosque  Renovation  Project  were  used 
5).  as  collateral  bank  loans  of  PT  Bank  Rakyat 
Indonesia (Persero) Tbk (Note 5). 
   
Pada  tanggal  30  September  2019  dan   As  of  September 30, 2019 and December 31, 
31 Desember 2018, saldo pinjaman Perusahaan ke  2018,  the  balance  of  loan  to  PT  Bank  
PT  Bank  Rakyat  Indonesia  (Persero)  Tbk  masing- Rakyat  Indonesia  (Persero)  Tbk  
masing  sebesar  Rp  2.666.607.674.038  dan   amounted  to  Rp  2,666,607,674,038  and  
Rp 1.272.706.650.083.  Rp 1,272,706,650,083, , respectively. 
   
4. PT Bank Syariah Mandiri 4. PT Bank Syariah Mandiri

Pada  tanggal  20  Maret  2019,  Perusahaan  As  of  March  20,  2019,  the  Company  signed 
menandatangani  Perjanjian  Line  Facility  into  Credit  Line  Facility  Musyarakah 
berdasarkan  prinsip  Musyarakah  No.  21/013- Agreement  Deed  No.  21/013-3/SP3/CB1  with 
3/SP3/CB1  dengan  PT    Bank  Syariah  Mandiri  atas  PT  Bank  Syariah  Mandiri  of  combined  
fasilitas  pembiayaan  gabungan  sebesar  facilities  amounted  to  Rp 1,500,000,000,000.  
Rp 1.500.000.000.000.  Sublimit  fasilitas  tersebut  The  Sublimit  for  this  facility  consist  of 
terdiri  dari  fasilitas  pembiayaan  modal  kerja  Transactional Working Capital Loan amounted 
transaksional  sebesar  Rp  1.475.000.000.000,  dan  to  Rp 1,475,000,000,000,  and  Musharaka 
Fasilitas  Musyarakah  Pembiayaan  Dana  Berputar  Revolving  Fund  Financing  amounted  to 
sebesar Rp 25.000.000.000. Fasilitas tersebut dapat  Rp 25,000,000,000.  The  availability  period  of 
digunakan  sampai    20  Maret  2020. Pada  tanggal  facility  is  until  March  20,  2020.  As  of  October 
13  Oktober  2017,  Perusahaan  menandatangani  13, 2017,  the Company signed an iB Supplier 
Perjanjian Pemberian Fasilitas iB Supplier Financing  Financing  Facility  (iB-SF)  Facility  Agreement 
(iB-SF)  dengan  Nomor  Buyer  L.40/P/WK/2017,  dan  with  Buyer  Number  L.40/P/WK/2017,  and 
Nomor  Bank  19/670A-PKS/DIR  dengan  Bank  Bank  Number  19/670A-PKS/DIR  with  Bank 
Syariah  Mandiri  dengan  nilai  fasilitas  Syariah  Mandiri  with  value  of  facilities  
Rp  500.000.000.000  yang  berlaku  sampai  dengan  Rp  500,000,000,000,  which  is  valid  until 
13  Oktober  2019,  dan  telah  diperpanjang  dengan  October 13, 2019, and has been extended with 
Nomor  Buyer  L.57/P/WK/2019  dan  Nomor  Bank  Buyer  Number  L.57/P/WK/2019  and  Bank 
21/638-PKS/DIR  dengan  nilai  fasilitas  sebesar  Number  21/638-PKS/DIR  with  a  facility  value 
Rp 1.000.000.000.000 yang berlaku sampai dengan  of  Rp  1,000,000,000,000  which  is  valid  until 
tanggal 13 April 2021.  April 13, 2021. 
   

114
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perusahaan  diwajibkan  untuk  mempertahankan  Under  the  agreement,  the  Company  should 
debt  to  equity  ratio  maksimum  3  (tiga)  kali,  debt  maintain  debt  to  equity  ratio  maximum  3 
service  coverage  ratio  minimal  1  kali  dan  current  (three)  times,  debt  service  coverage  ratio 
ratio  minimal  1  kali.  Pemenuhan  pembatasan  minimum  1  time  and  current  ratio  minimum  1 
pinjaman  bank  dilaporkan  oleh  Perusahaan  setiap  time. The fulfillment of bank lending restriction 
akhir tahun dan akan dievaluasi oleh bank.  will be reported by the Company at the end of 
  the year and will be evaluated by the bank. 
   
Pada  tanggal  30  September  2019,  tagihan  kepada  As  of  September  30,  2019,  all  amount  due 
pengguna  jasa  atas  proyek  Pekerjaan  from customers of JORR II Toll Road segment 
Pembangunan  Jalan  Tol  JORR  II  Ruas  Kunciran  –  Kunciran  -  Serpong  and  Krian  –  Legundi  - 
Serpong dan  Pembangunan Jalan Tol Ruas Krian –  Bunder - Manyar Toll Road Project were used 
Legundi  -  Bunder  -  Manyar,  digunakan  sebagai  as  collateral  bank  loans  of  PT Bank  Syariah 
jaminan  atas  utang  pada  PT Bank  Syariah  Mandiri  Mandiri (Note 5). 
(Catatan 5). 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September 30,  2019 and December 31, 
2018,  saldo  pinjaman  Perusahaan  kepada  2018, the balance of loan to PT Bank Syariah 
PT  Bank  Syariah  Mandiri  masing-masing  sebesar  Mandiri  amounted  to  Rp  1,497,980,562,553 
Rp  1.497.980.562.553  dan  Rp  999.999.999.744  and Rp 999,999,999,744, respectively. 
Nihil. 
   
5. Lembaga Pembiayaan Ekspor Indonesia   5. Lembaga Pembiayaan Ekspor Indonesia
(Indonesia Eximbank) (Indonesia Eximbank)
 
Perusahaan  memperoleh  fasilitas  Kredit  Modal  The  Company  obtained  an  Export  Working 
Kerja  Ekspor  (KMKE)  sebesar  Capital  Credit  (KMKE)  facility  amounted  to    
Rp 1.000.000.000.000  sesuai  dengan  Perubahan  Rp  1,000,000,000,000  in  accordance  to       
Kelima  Perjanjian  KMKE  No.  103/ADDPK/03/2019  the  Fifth  Amendment  of  KMKE  Agreement  
tanggal 27 Maret 2019. Fasilitas tersebut akan jatuh  No.  103/ADDPK/03/2019  dated  March  27, 
tempo pada 27 Maret 2020.  2019. The facility will be mature on March 27, 
2020. 
   
Pada  tanggal  30  September  2019, seluruh  tagihan  As  of  September  30,  2019,  all  amount  due 
kepada  pengguna  jasa  atas  proyek  Pekerjaan  from  customers  of  project  Development  of 
Pembangunan Jalan Tol Pasuruan Probolinggo dan  Pasuruan Probolinggo Toll Road and land and 
tanah  dan  bangunan  (HGB)  No.  592  Jl.  RE  building (HGB) No. 592 which located in Jl. RE 
Martadinata No. 24 Kel Ciputat, Tangerang Selatan,  Martadinata  No.  24  Kel  Ciputat,  Tangerang 
digunakan  sebagai  jaminan  atas  utang  bank  Selatan, were used as collateral bank loans of 
Indonesia Eximbank (Catatan 5).  Indonesia Eximbank (Note 5). 
   
Perjanjian ini juga mencakup batasan-batasan yang    Under  the  agreement  the  Company  is  not 
tidak  diperkenankan  dilakukan  oleh  Perusahaan  allowed  to  do  certain  actions without the  prior 
tanpa persetujuan tertulis terlebih dahulu dari Bank  written  consent  by  the  Bank  such  as,  a 
antara lain; melakukan merger, akuisisi yang dapat  merger,  acquisition  that  can  impact  paying 
menghambat kewajiban pembayaran kredit kepada  obligations  to  the  bank;  obtaining  new  loans 
bank; memperoleh pinjaman baru atas proyek yang  on  projects  that  have  been  financed  by        
telah  dibiayai  oleh  bank;  memperluas  atau  the  bank; expand or  narrow  the  business  that 
mempersempit  usaha  yang  dapat  mempengaruhi  may  affect  the  repayment of  loans;  the usage 
   
pengembalian  pinjaman;  penggunaan  fasilitas    of  credit  facilities  for  purposes  other  than 
kredit  selain  daripada  untuk  tujuan  pembiayaan  financing  credit  facilities  purposes;  filed  
fasilitas  kredit;  mengajukan  permohonan  kepailitan  the  bankruptcy  petition  to  the  court;  sell  or 
kepada  pengadilan;  menjual  atau  memindahkan  transfer assets used as collateral; lend money 
aset  yang  dijadikan  jaminan;  meminjamkan  uang  to  anyone,  except  the  result  of  normal 
kepada  siapapun,  kecuali  akibat  kegiatan  usaha  business  activities;  act  as  a  guarantor  or 
yang  normal;  bertindak  sebagai  penjamin  atau  pledge assets property to another party. 
menjaminkan harta kekayaan kepada pihak lain. 
     

115
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perusahaan  diwajibkan  untuk  mempertahankan    Under  the  agreement  the  Company  should 
rasio keuangan sebagai berikut: debt to equity ratio  maintain  the  following  financial  ratios:  debt  to 
maksimum 3 (tiga) kali, debt service coverage ratio  equity  ratio  maximum  3  times,  debt  service 
minimal  2  kali  dan  current  ratio  minimal  1  kali.  coverage  ratio  at  least  2  times  and  current 
Pemenuhan pembatasan pinjaman bank dilaporkan  ratio  at  least  1  time.  The  fulfillment  of  bank 
oleh  Perusahaan  setiap  akhir  tahun  dan  akan  lending  restrictions  will  be  reported  by  the 
dievaluasi oleh bank.  Company  at  the  end  of  the  year  and  will  be 
evaluated by   the bank. 
   
Pada  tanggal  30  September  2019  dan   As  of  September 30, 2019 and December 31, 
31  Desember  2018,  saldo  pinjaman  Perusahaan  2018,  the  balance  of  Company’s  
kepada  Indonesia  Eximbank  masing-  loan  to  Indonesia  Eximbank  
masing  sebesar  Rp  999.547.892.246  dan  amounted  to  Rp  999,547,892,246  and  
Rp 1.949.700.000.000.  Rp 1,949,700,000,000, respectively. 

6. Sindikasi Transmisi 500 KV Sumatera 6. Transmission 500 KV Sumatera Syndication


Loan
     
Berdasarkan  Perjanjian  Kredit  Sindikasi  No.  25    Based  on  the  Syndicated  Credit  Agreement 
tanggal  23  Mei  2016,  Perusahaan  memperoleh  No.  25  dated  May  23,  2016,  the  Company 
fasilitas  kredit  sindikasi  PT Bank  Rakyat  Indonesia  obtained  syndicated  credit  facilities  from 
(Persero)  Tbk  dan  PT Bank  Central  Asia  Tbk  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk  
sebesar  maksimum  Rp 4.402.500.000.000  dengan  and PT Bank Central Asia Tbk for a maximum 
suku  bunga  reference  rate  (Average  Time  Deposit)  of Rp 4,402,500,000,000 with a  reference  rate  
untuk  jangka  waktu  3  bulan  ditambah  marjin.   (Average  Time  Deposit)  for  3  months  period 
Fasilitas  tersebut  memiliki  jangka  waktu  3  tahun  plus    a    maximum    margin.  The  facility  has  a 
atau  maksimum  4  tahun  dalam  hal  BAST  1  untuk  period  of  3  years  or  a  maximum  of  4  years  in 
Proyek  Transmisi  Paket  1  dan  2  tidak  diterima  the  case  of  BAST  1  for  Transmisi  Projects 
dalam  waktu  3  tahun  setelah  perjanjian  kredit  package  1  and  2  not  received  within  3  years 
ditandatangani.  Pada  tanggal  10 Juli  2017  melalui  after  the  credit  agreement  is  signed.  On  July 
Sertifikat  Pengalihan  Kredit,  PT  Bank  Rakyat  10,  2017  through  the  Credit  Transfer 
Indonesia  (Persero)  Tbk  melimpahkan  sebagian  Certificate,  PT  Bank  Rakyat  Indonesia 
porsinya sebagai kreditur ke Lembaga Pembiayaan  (Persero) Tbk delegated part of its portion as a 
Ekspor  Indonesia,  PT  Bank  Maybank  Indonesia  creditor  to  the  Lembaga  Pembiayaan  Ekspor 
Tbk, dan PT Sarana Multi Infrastruktur (Persero).  Indonesia,  PT  Bank  Maybank  Indonesia  Tbk, 
and PT Sarana Multi Infrastruktur (Persero). 
     
Berdasarkan  surat  PT Bank  Rakyat  Indonesia    Based  on  the  letter  of  PT  Bank  Rakyat 
(Persero) Tbk No. B-645-SJK/SDK/06/2019  tanggal  Indonesia  (Persero)  Tbk  No.  B-645-SJK/SDK/ 
21  Juni  2019  selaku  Agen,  Fasilitas  suku  bunga  06/2019  dated  June  21,  2019  as  an  Agent, 
yang  berlaku  untuk  fasilitas  kredit  sindikasi  adalah  the interest rate facility applicable to syndicated 
reference  rate  ditambah  marjin  maksimal  sebesar  credit  facilities  is  the  reference  rate  plus  a 
9,825% per tahun.  maximum margin of 9.825% per anum 
     
Tujuan dari fasilitas kredit sindikasi ini adalah untuk  The  purpose  of  the  syndicated  credit  facility  is 
membiayai  kebutuhan  modal  kerja  konstruksi  to  finance  the  working  capital  needs  for 
pengadaan  transmisi  500  kV  Sumatera  (“Proyek  construction  procurement  of  Sumatera  500  kV 
Transmisi  Sumatera”)  yang  terdiri  dari  pengadaan  transmission  ("Sumatera  Transmission 
transmisi  dengan  rute  New  Aur  Duri  –  Peranap  Project")  consisting  of  procurement 
(Seksi 1) dan rute Peranap – Perawang (Seksi 2).  transmission  route  New  Aur  Duri  –  Peranap 
(Section  1)  and  the  Peranap  –  Perawang 
(Section 2). 
   
Setelah  berita  acara  serah  terima  untuk  masing- After  the  handover  for  each  work  package 
masing  paket  pekerjaan  diserahkan  kepada  PLN  submitted  to  PLN  as  the  owner  of  the  project, 
selaku  owner  proyek,  sumber  pelunasan  dari  the source of repayment of the credit facility will 
fasilitas  kredit  ini  akan  beralih  secara  langsung  be  switched  directly  to  the  owner. 
kepada  owner.  Seluruh  tagihan  atas  pekerjaan  dan  The  entire  bill  for  the  work  and  the  bill  on 
tagihan  atas  klaim  asuransi  terkait  proyek  yang  insurance  claims  related  to  projects  financed 
dibiayai menjadi jaminan atas fasilitas kredit ini.  served as collateral for the credit facility. 
   

116
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perjanjian ini juga mencakup batasan-batasan yang  This  Agreement  also  includes  restrictions 
tidak  diperkenankan  dilakukan  oleh  Perusahaan  the Company and is not permitted without prior 
tanpa  persetujuan  tertulis  terlebih  dahulu  dari  Bank  written approval from the Bank, among others: 
antara lain:   
   
a.  Memberikan  jaminan  Perusahaan  (corporate  a.  Providing  corporate  guarantees  to  other 
guarantee)  kepada  pihak  lain,  kecuali  untuk  parties,  except  guaranteed  the  obligations 
menjamin  kewajiban  Anak  Perusahaan  yang  of  Subsidiaries  conducting  business 
menjalankan  kegiatan  usaha  yang  termasuk  activities  that  fall  within  the  aims  and 
dalam  maksud  dan  tujuan  Perusahaan  yang  objectives  of  the  Company  contained  in 
dimuat dalam anggaran dasarnya;  their articles of association; 
   
b.  Melakukan  permohonan  pailit  dan  permohonan  b.  Conducting  bankruptcy  application  and 
penundaan  pembayaran  kepada  instansi  yang  request  for  postponement  of  payment  to 
berwenang (pengadilan);  authorized institution (court); 
   
c.  Menjual  atau  melepaskan  harta  tidak  bergerak  c.  Selling  or  releasing  immovable  property  or 
atau harta  kekayaan  utama  dalam  menjalankan  principal  assets  in  the  course  of  its 
usahanya,  kecuali  tidak  mempengaruhi  business,  except  as  long  as  it  does  not 
kewajiban pembayaran utang Debitur;  affect  the  debt  service  obligation  of  
the Borrower; 
 
d.  Melakukan  akuisisi,  merjer,  konsolidasi,  d.  To  acquire,  merge,  consolidate,  segregate 
pemisahan atau membeli atau dengan cara lain  or  purchase  or  otherwise  acquire  a 
memperoleh  Perusahaan  atau  saham-saham  company  or  shares  in  a  company  that 
dalam  Perusahaan  yang  menjalankan  kegiatan  carries  on  business  activities  not  included 
usaha  yang  tidak  termasuk  dalam  maksud  dan  in the Company's purposes and objectives 
tujuan  Perusahaan  yang  dimuat  dalam  contained in its articles of association; and 
anggaran dasarnya; dan   
   
e.  Mengubah status kelembagaan, maksud, tujuan  e.  Changing  the  institution's  status,  intent, 
atau kegiatan usaha utama Perusahaan.  purpose or main business activity. 
     
Perusahaan  diwajibkan  untuk  mempertahankan    The  Company  is  required  to  maintain             
rasio keuangan sebagai berikut:  the following financial ratios: 
a.  current ratio minimal 1 (satu) kali;   a.  current ratio of at least 1 (one) time; 
b.  debt to equity ratio maksimal 3 (tiga) kali; dan  b.  debt  to  equity  ratio  maximum  of  3  (three) 
   times; and 
c.  perbandingan  antara  EBITDA  dengan  beban  c.  comparison  between  EBITDA  and  interest 
bunga  tidak  kurang  dari  1,5  (satu  koma  lima)  expense  no  less  than  1.5  (one  point  five) 
kali.  times. 
     
Pemenuhan  pembatasan pinjaman  bank  dilaporkan  The fullfilment of bank lending restriction will be 
oleh  Perusahaan  setiap  akhir  tahun  dan  akan  reported  by  the  Company  at  the  end  of 
dievaluasi oleh bank.  the year and will be evaluated by the bank. 
     
Pada tanggal 30 September 2019 dan 31 Desember    As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  Perusahaan  kepada  PT  Bank  2018,  the  outstanding  balance  of 
Rakyat  Indonesia  (Persero)  Tbk  sebesar  the  Company's  loans  to  PT  Bank  Rakyat 
Rp 689.256.515.272  dan  Rp 592.291.027.654;  Indonesia  (Persero)  Tbk  amounted  to 
Indonesia  Eximbank  sebesar  Rp 325.902.840.700  Rp  689,256,515,272  and  Rp  592,291,027,654; 
dan  Rp 270.725.279.811;  PT  Bank  Central   Indonesia  Eximbank  amounted  to 
Asia  Tbk  sebesar  Rp  434.537.169.616  dan   Rp  325,902,840,700  and  Rp  270,725,279,811; 
Rp  360.967.055.125;  dan  PT  Bank  Maybank   PT  Bank  Central  Asia  Tbk 
Indonesia  Tbk  sebesar  Rp  152.087.992.325  dan   amounted  to  Rp 434,537,169,616  and 
Rp 126.338.463.910.  Rp 360,967,055,125;  and  PT  Bank 
Maybank  Indonesia  Tbk  amounted  to 
Rp 152,087,992,325 and Rp 126,338,463,910. 
     
 
 
 
 
 

117
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
7. Sindikasi Jakarta-Cikampek Elevated II   7. Syndication Bank Loan Jakarta - Cikampek
Elevated II
   
Berdasarkan  Akta  Perjanjian  Kredit  No.  09  tanggal    Based  on  the  Deed  of  Credit  Agreement 
7  Nopember  2017  yang  dibuat  di  hadapan  Notaris  No.  09  dated  November  7,  2017  from  Notary 
Fathiah  Helmi,  S.H.  beserta  dengan  perubahan- Fathiah  Helmi,  S.H.  along  with  the  changes 
perubahannya  perusahaan  telah  memperoleh  the  Company  has  obtained  a syndicated  credit 
fasilitas  kredit  sindikasi  dengan  ketentuan  sebagai  facility with the following conditions:
berikut: 
   
1.  Fasilitas  Kredit  Tranche  A  sebesar    1.  Tranche  A  Credit  Facility  amounted  to     
Rp  2.750.000.000.000  dari  PT  Bank  Mandiri  Rp  2,750,000,000,000  from  PT  Bank 
(Persero)  Tbk,  The  Bank  of  Tokyo-Mitsubishi  Mandiri (Persero) Tbk, The Bank of Tokyo-
UFJ,  LTd.,  Cabang  Jakarta,  PT  Sarana  Multi  Mitsubishi  UFJ,  LTd.,  Jakarta  Branch,  
Infrastruktur  (Persero),  PT  Bank  Central  Asia  PT  Sarana  Multi  Infrastruktur  (Persero),  
Tbk, PT Bank BNP Paribas Indonesia,  PT Bank  PT  Bank  Central  Asia  Tbk,  PT  Bank  BNP 
CIMB  Niaga  Tbk,  dan  PT  Bank  KEB  Hana  Paribas  Indonesia,  PT  Bank  CIMB  Niaga 
Indonesia  yang  digunakan  untuk  pembiayaan  Tbk,  and  PT  Bank  KEB  Hana  Indonesia 
modal kerja pembangunan proyek.  that are used to finance working capital for 
  project development.

2.  Fasilitas  Kredit  Tranche  B  sebesar    2.  Tranche  B  Credit  Facility  amounted  to       
Rp  340.000.000.000  dari  PT  Bank  Mandiri  Rp 340,000,000,000 from PT Bank Mandiri 
(Persero)  Tbk,  PT  Bank  Central  Asia  Tbk,  (Persero)  Tbk,  PT  Bank  Central  Asia  Tbk, 
PT  Bank  CIMB  Niaga  Tbk,  dan  PT  Bank  KEB  PT  Bank  CIMB  Niaga  Tbk,  and  PT  Bank 
Hana  Indonesia  yang  digunakan  untuk  KEB Hana Indonesia are used for financing 
pembiayaan  Down  Payment  atau  uang  muka  Down  Payment  or  advances  for 
atas  pengadaan  barang  dan  atau  jasa  porsi  procurement  of  goods  and  or  Waskita's 
Waskita kepada KSO KS-Bukaka sesuai dengan  portion  service  to  KSO  KS-Bukaka  is  in 
Perjanjian JO/KSO KS-Bukaka.  accordance  with  the  JO/KSO  KS-Bukaka 
Agreement.

3.  Fasilitas  Kredit  Tranche  C  sebesar    3.  Tranche  C  Credit  Facility  amounted  to        
Rp  2.050.000.000.000  dari  PT  Bank  Mandiri  Rp  2,050,000,000,000  from  PT  Bank 
(Persero)  Tbk,  The  Bank  of  Tokyo-Mitsubishi  Mandiri (Persero) Tbk, The Bank of Tokyo-
UFJ,  LTd.,  Cabang  Jakarta,  dan  PT  Bank  Mitsubishi  UFJ,  LTd.,  Jakarta  Branch  and 
Central  Asia  Tbk  yang  digunakan  untuk  PT  Bank  Central  Asia  Tbk  are  used  for 
pembiayaan  supplier  financing  atas  dasar  financing supplier financing on the basis of 
akseptasi  invoice  kepada  Waskita  khusus  invoice  acceptance  to  Waskita  specifically 
pengadaan  barang  dan  atau  jasa  sesuai  the  procurement  of  goods  and  or  services 
Perjanjian JO/KSO KS-Bukaka.  in accordance with the KS/Bukaka JO/KSO 
Agreement.
   
Perusahaan memberikan jaminan-jaminan sebagai    The  company  provides  the  following 
berikut:  guarantees: 
a.  Jaminan Fidusia atas Tagihan;    a.  Fiduciary Guarantee on Bills; 
b.  Jaminan Fidusia atas Hasil Klaim Asuransi; dan    b.  Fiduciary  Guarantee  on  the  Results  of 
c.  Perjanjian Pengalihan Hak.  Insurance Claims; and 
  c.  Rights Transfer Agreement. 
   
Per  30  September  2019,  seluruh  tagihan  kepada    As of September 30, 2019, all amount due from 
pengguna  jasa  atas  proyek  Jalan  Tol  Jakarta- customers of the Jakarta – Cikampek Elevated 
Cikampek  Elevated  II  digunakan  sebagai  jaminan  II  Toll  Road  project  are  used  as  collateral 
(Catatan 5).  (Note 5). 
   
Perusahaan diwajibkan untuk mempertahankan debt    The  company  is  required  to  maintain  a 
(ad. Interest bearing debt) to equity ratio maksimum  maximum  debt  (ad.  Interest  bearing  debt)  to 
3  kali,  debt  service  coverage ratio  minimal  1,00  kali  equity  ratio  3  times,  a  minimum  debt  service 
dan  current  ratio  minimal  1,00  kali.  Fasilitas  dapat  coverage  ratio  of  1.00  time and  a  current  ratio 
digunakan  sampai  dengan  tanggal  26  Desember  of  at  least  1.00  time.  This  facility  can  be  used 
2019.  until December 26, 2019. 
     

118
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada tanggal 30 September 2019 dan 31 Desember    As  of  September  30,  2019  and  December  31, 
2018, saldo pinjaman Perusahaan kepada PT Bank  2018  the  Company's  loans  to  PT  Bank 
Mandiri  (Persero)  Tbk  masing-masing  sebesar  Mandiri  (Persero)  Tbk  amounted  to 
Rp  643.154.866.544  dan  Rp  424.266.909.090;  Rp  643,154,866,544  and  Rp  424,266,909,090; 
PT  Bank  CIMB  Niaga  Tbk  masing-masing  sebesar  PT  Bank  CIMB  Niaga  Tbk  Amounted  to 
Rp  725.154.866.544  dan  Rp  424.266.909.090;  Rp  725,154,866,544  and  Rp  424,266,909,090; 
PT  Bank  Central  Asia  Tbk  masing-masing  sebesar  PT  Bank  Central  Asia  Tbk  amounted  to 
Rp  300.141.507.624  dan  Rp  424.266.909.090;  Rp  300,141,507,624  and  Rp  424,266,909,090; 
Bank  of  Tokyo  Mitsubishi  UFJ.  Ltd.  Bank  of  Tokyo  Mitsubishi  UFJ.  Ltd. 
masing-masing  sebesar  Rp  91.624.934.891  amounted  to  Rp  91,624,934,891  and 
dan  Rp  212.133.090.910;  PT  Bank  BNP  Rp  212,133,090,910;  PT  Bank  BNP  Paribas 
Paribas  Indonesia  masing-masing  sebesar  Indonesia  amounted  to  Rp  291,576,933,456 
Rp  291.576.933.456  dan  Rp  212.133.090.910;  dan  and  Rp  212,133,090,910;  and  PT  Bank 
PT  Bank  KEB  Hana  Indonesia  masing-  KEB  Hana  Indonesia  amounted  to 
masing  sebesar  Rp  202.804.600.000  dan  Rp  202,804,600,000  and  Rp  90,800,000,000, 
Rp 90.800.000.000.  respectively. 
 
8. PT Bank Pan Indonesia Tbk 8. PT Bank Pan Indonesia Tbk 
   
Perusahaan  memperoleh  fasilitas  pinjaman   The  Company  obtained  money  market  loan 
money  market  sebesar  Rp  2.500.000.000.000  facilities  amounted  to  Rp 2,500,000,000,000 
dengan  garansi  bank  (switchable)  sesuai   and  bank  guarantee  (switchable)  according  to 
dengan  Perubahan  Perjanjian  Kredit   Credit  Agreement  No.  003/IBD-MM/LEG/17/ 
No. 003/IBD-MM/LEG/17/Per.II dan dilegalisasi oleh  Per.II  and  was  legalized  by  Notary  M.  Kholid 
Notaris  M.  Kholid  Artha,  SH.  Fasilitas  dapat  Artha,  SH.  This  facility  can  be  used  until  May 
digunakan sampai dengan tanggal 24 Mei 2020. 24, 2020.
   
Perjanjian  ini  juga  mencakup  batasan-batasan  Under  the  agreement  the  Company  is  not 
yang  tidak  diperkenankan  dilakukan  oleh  allowed  to  do  certain  actions  without  the  prior 
Perusahaan  tanpa  persetujuan  tertulis  terlebih  written consent Bank, such as, receive a loan or 
dahulu  dari  Bank  antara  lain  menerima  pinjaman  new  credit  from  another  bank  or  a  third  party 
atau  kredit  baru  dari  bank  lain  atau  pihak  ketiga  whose  numbers  can  lead  to  the  violation  of 
yang  jumlahnya  dapat  menyebabkan  dilanggarnya  financial  ratios  on  financial  covenants;  bind 
rasio  keuangan  pada  financial  covenant;  themselves  as  a  loan  against  the  third  parties, 
mengikatkan  diri  sebagai  pinjaman terhadap  pihak  opening new businesses other than an existing 
ketiga;  membuka  usaha  baru  selain  dari  usaha  business;  dissolve  or  liquidate  the  Company; 
yang  telah  ada; membubarkan  atau  melikuidasi  change fields /types of business;  to  apply   for 
Perusahaan;  merubah  bidang/jenis  usahanya;  bankruptcy  or  delayed  payment  of  its  debts 
mengajukan  permohonan  untuk  dinyatakan  pailit  (surseance van betaling); change the legal form 
atau penundaan pembayaran atas utang-utangnya  or  legal  status  of  the  Company;  change          
(surseance  van  betaling);  merubah  bentuk  hukum  the Company's articles of association;   leasing 
atau  status  hukum  Perusahaan;  merubah  the  Company  to  a  third  party;  lease/transfer 
anggaran  dasar  Perusahaan;  menyewakan  the  goods  used  as  collateral;  transferring 
Perusahaan  kepada  pihak  ketiga;  menyewakan/  the  Company  in  any  form  to  any  third  party; 
memindahtangankan  barang-barang  yang  issuing new shares and selling existing shares; 
dipergunakan  sebagai  jaminan;  paying  their  debts  to  shareholders  and  shares 
memindahtangankan  Perusahaan  dalam  bentuk  or  the  shareholder  in  any  form  for  existing  or 
apapun  kepada  pihak  ketiga;  mengeluarkan  that  will  be  arise  in  the  future;  a  merger  or 
saham-saham  baru  dan  menjual  saham-saham  business  combination  that  changes 
yang telah ada; membayar hutangnya kepada para  the  composition  of  share  ownership;  allow 
pemegang saham dan atau para perseronya dalam  the  shareholders  to  withdraw  the  capital  that 
bentuk  apapun  juga  yang  sekarang  telah  ada  has  been  deposited,  pledged  or  mortgaged 
maupun  yang  akan  timbul  dikemudian  hari;  the Company’s shares 
melakukan  merger  atau  penggabungan  usaha 
sehingga  merubah  komposisi  kepemilikan  saham; 
memperbolehkan pemegang saham untuk menarik 
kembali  modal  yang  telah  disetor,  menjaminkan 
atau menggadaikan saham Perusahaan.  
   

119
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perusahaan  diwajibkan  untuk  mempertahankan  Under  the  agreement  the  Company  should 
rasio  keuangan  sebagai  berikut:  debt  (a.d  interest  maintain the following financial ratios: debt (a.d 
bearing  debt)  to  equity  ratio  maksimum  3  kali,  interest  bearing  debt)  to  equity  ratio  maximum 
interest service coverage ratio lebih besar dari 2 kali  3 times, interest service coverage ratio greater 
dan  current  ratio  minimal  1  kali.  Pemenuhan  than  2  times  and  current  ratio  at  least  1  time. 
pembatasan  pinjaman  bank  dilaporkan  oleh  The  fulfillment  of  bank  lending  restrictions  will 
Perusahaan setiap akhir tahun dan akan dievaluasi  be  reported  by  the  Company  at  the  end  of     
oleh PT Bank Pan Indonesia Tbk. the year and will be evaluated by PT Ban Pan 
Indonesia Tbk . 
   
Pada tanggal 30 September 2019, seluruh tagihan  As of September 30, 2019, all amount due from 
kepada pengguna jasa atas proyek Jalan Tol Kayu  costumers  of  Kayu  Agung  –  Palembang  - 
Agung – Palembang - Betung Paket 4 Seksi 3 dan  Betung  Package  4  Section  3  toll  road  project 
proyek Pembangunan Jalan Tol Ciawi – Sukabumi  and  the  Development  of  Ciawi–Sukabumi  Toll 
Seksi  3  dijaminkan  atas  utang  bank  PT Bank  Pan  Road  Section  3  project  were  pledged  against 
Indonesia Tbk (Catatan 5). bank  loans  of  PT Bank  Pan  Indonesia  Tbk 
(Note 5). 
 
Pada  tanggal  30  September  2019  dan   As  of  September  30,  2019  and  December  
31  Desember  2018,  saldo  pinjaman  Perusahaan  31,  2018,  the  balance  of  loan  to  
kepada  PT  Bank  Pan  Indonesia  Tbk   PT  Bank  Pan  Indonesia  Tbk  
masing-masing sebesar Rp 2.494.360.645.571 dan   amounted  to  Rp  2,494,360,645,571  and  
Rp 2.000.000.000.000. Rp 2,000,000,000,000, respectively. 
   
9. PT Bank Pembangunan Daerah Jawa Barat dan 9. PT Bank Pembangunan Daerah Jawa Barat
Banten Tbk dan Banten Tbk
   
Perusahaan  memperoleh  fasilitas  Kredit  Modal  The  Company  obtained  a  Working  Capital 
Kerja  (KMK)  sebesar  Rp 750.000.000.000  dan  Loan (WCL) amounted to Rp 750,000,000,000 
fasilitas  non-kas  loan  yang  dapat  digunakan  untuk  and  non-cash  facility  for  Supply  Chain 
Supply  Chain  Financing  (SCF),  SKBDN,  L/C  dan  Financing  (SCF),  SKBDN,  L/C,  and  bank 
bank  garansi  Rp  250.000.000.000  sesuai  akta  guarantee  amounted  to  Rp  250,000,000,000 
adendum  perjanjian  kredit  No.  24  tanggal  according  to  credit  agreement  addendum 
7 Nopember  2018  oleh  Notaris  H.  Aristiawan  Dwi  No. 24  dated  November  7,  2018  by  Notary  H. 
Putranto,  S.H.,  M.Kn.  Fasilitas  tersebut  dapat  Aristiawan  Dwi  Putranto,  S.H.,  M.Kn.  
digunakan  sampai  dengan  7 Nopember  2019.  The  facility  can  be  used  until  November 7, 
Perusahaan  juga  memperolah  fasilitas  kredit  2019.  The  Company  also  obtained  additional 
tambahan sebesar Rp 750.000.000.000 sesuai Akta 
credit facility amounted to Rp 750,000,000,000 
Perjanjian  kredit  No.  23  tanggal  23  Agustus  2019 
in  accordance  with  Deed  of  Credit  Agreement 
oleh  Notaris  Fessy  Farisqoh  Alwi,  S.H.,  M.Kn. 
Fasilitas  Kredit  tersebut  dapat  digunakan  sampai  No. 23 dated August 23, 2019 by Notary Fessy 
dengan 23 Pebruari 2020.  Farisqoh  Alwi,  S.H.,  M.Kn.  The  facility  can  be 
used until February 23, 2020.  
   
Perjanjian  ini  juga  mencakup  batasan-batasan  This  agreement  includes  restrictions  where  
yang  tidak  diperkenankan  dilakukan  oleh  the  Company  is  not  allowed  to  do  certain 
Perusahaan  tanpa  persetujuan  tertulis  terlebih  actions  without  the  prior  written  consent  by     
dahulu dari bank antara lain: memindah tangankan  the  Bank,  such  as:  transferring  the  collateral/ 
agunan/tagihan  termin;  mengubah  bentuk  objek  billing  terms;  changing  the  object  of  credit 
agunan kredit; memperoleh fasilitas kredit investasi  collateral;  obtaining  an  investment  credit 
atau  pinjaman  lain  dari  pihak  ketiga  untuk  proyek  facility  or  other  loans  from  third  parties  for    
yang  sama  kecuali  dalam  transaksi  usaha  yang  the  same  project,  except  for  the  normal 
wajar;  mengikatkan  diri  sebagai  penjamin  hutang  operation  transaction;  bind  itself  as  guarantor 
atau  menjaminkan  harta  kekayaan  Perusahaan  ofthe  debt  or  mortgage  the  Company’s 
yang  dibiayai  kepada  pihak  lain;  penggabungan 
financed  assets  that  financed  the  property  to 
dan  peleburan  dengan  pihak  ketiga;  mengajukan 
another  party;  acquisition  and  merger  and 
permohonan  dan  atau  menyuruh  pihak  lain 
mengajukan permohonan kepada pengadilan untuk  merger  with  third  parties;  apply  and  or 
dinyatakan  pailit  atau  penundaan  pembayaran  encouraging others to apply to the court to be 
hutang, meminjamkan uang kepada siapapun juga,  declared  bankrupt  or  delay  payment  of         
kecuali  akibat  kegiatan  usaha  yang  normal  dalam  the  debt,  lend  money  to  anybody,  except  for 
usaha debitur; menyerahkan sebagian atau seluruh  results  of  normal  business  activities  in  
hak dan atau kewajiban atas fasilitas kredit kepada  the  debtor's  business;  give  up  some  or  all  of 
pihak lain.  the rights and obligations of the credit facility to 
another party. 
   

120
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada tanggal 30 September 2019, seluruh tagihan  As  of  September  30,  2019,  all  amount  due 
kepada  pengguna  jasa  atas  pembangunan  Tol  from  customers  of  Terbanggi  Besar  – 
Ruas  Terbanggi  Besar  -  Pematang  Panggang  -  Pematang Panggang – Kayu Agung section 2 
Kayu  Agung  Seksi  2  dan  Jalan  Tol  Semarang  -  tolll  road project and  Semarang  –  Batang Toll 
Batang  digunakan  sebagai  jaminan  atas  utang  Road  were  used  as  collateral  bank  loans  of  
Bank  PT  Bank  Pembangunan  Daerah  Jawa  Barat  PT  Bank  Pembangunan  Daerah  Jawa  Barat 
dan Banten Tbk (Catatan 5).  dan Banten Tbk (Note 5). 
   
Perusahaan  diwajibkan  untuk  mempertahankan  Under  the  agreement,  the  Company  should 
debt  to  equity  ratio  maksimum  3  kali  dan  current  maintain debt to equity ratio maximum 3 times 
ratio  minimal  1  kali.  Pemenuhan  pembatasan  and  current  ratio  minimum  1  time.  
pinjaman  bank  dilaporkan  oleh  Perusahaan  setiap  The  fulfillment  of  bank  lending  restriction  will 
akhir  tahun  dan  akan  dievaluasi  oleh  PT  Bank  be  reported  by  the  Company  at  the  end  of  
Pembangunan Daerah Jawa Barat dan Banten Tbk.  the  year  and  will  be  evaluated  by  PT  Bank 
  Pembangunan Daerah Jawa Barat dan Banten 
Tbk. 
   
Pada  tanggal  30  September  2019  dan   As  of September 30,  2019 and December  31, 
31  Desember  2018,  saldo  pinjaman  Perusahaan  2018,  the  balance  of  loan  to  PT  Bank 
kepada  PT Bank  Pembangunan  Daerah  Jawa  Pembangunan Daerah Jawa Barat dan Banten 
Barat  dan  Banten  Tbk  masing-masing  sebesar   Tbk  amounted  to  Rp  1,599,985,000,000  and 
Rp 1.599.985.000.000 dan Rp 845.000.000.000.   Rp 845,000,000,000, respectively. 

10. PT Bank DKI   10. PT Bank DKI 

Pada  tanggal  12  September  2018,  Perusahaan  As  of  September  12,  2018,  the  Company 
menandatangani  Akta  Addendum  Perjanjian  Kredit  signed into Addendum Credit Agreement Deed 
No.  143  dengan  PT  Bank  DKI  atas  fasilitas  Kredit  No. 143 with PT Bank DKI of Fixed Term Loan 
Modal  Kerja  Pinjaman  Tetap  Berjangka  sebesar  Working  Capital  Loan  amounted  to  
Rp 1.000.000.000.000.  Fasilitas  tersebut  dapat  Rp  1,000,000,000,000.  The  availability  period 
digunakan  sampai  12 September 2019, yang  telah  of  the  facility  is  until  September  12,  2019, 
diperpanjang  pada  tanggal  06  September  2019  which  has  been  extended  on  September  6, 
yang  sedang  dalam  pengurusan  notaris sesuai  2019  in  accordance  with  the  Covernote  of 
dengan  Covernote  Notaris  Kholid  Artha  dengan  Notary Kholid Artha No. 11/ Ket/IX/2019, which 
Nomor 11/Ket/IX/2019 yang berlaku sampai dengan  is valid until December 6, 2019.
06 Desember 2019.
   
Perusahaan  diwajibkan  untuk  mempertahankan  Under  the  agreement,  the  Company  should 
debt to equity ratio maksimum 4,5 kali, debt service  maintain  debt  to  equity  ratio  maximum  4.5 
coverage  ratio  minimal  1  kali  dan  current  ratio  times,  debt  service  coverage  ratio  minimum  1 
minimal  1  kali.  Pemenuhan  pembatasan  pinjaman  time  and  current  ratio  minimum  1  time.  
bank dilaporkan oleh Perusahaan setiap akhir tahun  The  fulfillment  of  bank  lending  restriction  will 
dan akan dievaluasi oleh PT Bank DKI.  be  reported  by  the  Company  at  the  end  of  
  the  year  and  will  be  evaluated  by  PT  Bank 
DKI. 
   
Pada  tanggal  30  September  2019,  tagihan  kepada  As  of  September  30,  2019,  all  amount  due 
pengguna  jasa  atas  proyek  Pembangunan  (Design  from  costumers  of  the  Development  and 
and  Build)  Akses  Pelabuhan  Kuala  Tanjung  Ruas  Design  Project  Access  Kuala  Tanjung  Port 
Inderapura  -  Kuala  Tanjung  digunakan  sebagai  section  Inderapura  -  Kuala  Tanjung  are  used 
jaminan atas utang pada PT Bank DKI (Catatan 5).  as  collateral  for  the  debts  of  PT  Bank  DKI  
(Note 5). 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  
2018  saldo  pinjaman  Perusahaan  kepada  PT  Bank  31, 2018, the balance of loan to PT Bank DKI 
DKI  masing-masing  sebesar  Rp  997.539.383.769  amounted  to  Rp  997,539,383,769  and  
dan Rp 1.000.000.000.000.  Rp 1,000,000,000,000, respectively. 

121
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
11. PT Bank BTPN Tbk (d/h PT Bank Sumitomo 11. PT Bank BTPN Tbk (formerly PT Bank
Mitsui Indonesia) Sumitomo Mitsui Indonesia)
   
Berdasarkan  Perubahan  Pertama  atas  Perjanjian  Based  on  the  first  change  of  Facility 
Fasilitas No. SMBCI/NS/0447 tanggal 31 Desember  Agreement  No.  SMBCI/NS/0447  dated 
2018,  Perusahaan  memperoleh  fasilitas  kredit  dari  December  31, 2018, the Company obtained a 
PT  Bank  BTPN  Tbk  berupa  fasilitas  cash  loan  credit  facility  from  PT  Bank  BTPN  Tbk  in  
revolving  sebesar  Rp 950.000.000.000.  Fasilitas  the  form  of  cash  loan  revolving  facility 
tersebut  dapat  digunakan  sampai  dengan  tanggal  amounted  to  Rp 950,000,000,000.  The  facility 
31 Desember 2019.  can be used until December 31, 2019.   
   
Perjanjian  ini  mencakup  batasan  –  batasan  yang  Under  the  agreement  the  Company  is  not 
tidak  diperkenankan  dilakukan  oleh  Perusahaan  allowed  to  do  certain  actions  without  the  prior 
tanpa persetujuan  tertulis  terlebih dahulu dari  bank  written consent by the bank, such as, installing 
antara  lain,  memasang  atau  mengizinkan  adanya  or  permitting  the  presence  or  installation  of 
atau  dipasangnya  hak  jaminan  atas  aset-asetnya;  security  rights  over  its  assets;  sell,  transfer  or 
menjual,  mengalihkan  atau  melepaskan  aset- otherwise  dispose  of  its  assets  with  
asetnya  dengan  ketentuan-ketentuan  dimana  aset- the  provisions  in  which  these  assets  can  be 
aset  tersebut  dapat  disewakan  atau  dibeli                leased  or  bought  back  by  the  Borrower;  sell, 
kembali oleh Peminjam; menjual, mengalihkan atau  transfer  or  dispose  of  its    receivables    with 
melepaskan  piutangnya  dengan  hak  regres;  recourse; entered into any arrangement where 
mengadakan pengaturan apapun dimana uang atau  the  money  or  the  benefits  of  a  bank  or  other 
manfaat  bank  atau  rekening  lain  dapat  digunakan  account  may  be  used  for  payments,  made 
untuk  pembayaran,  dilakukan  kompensasi  (set-off)  compensation  (set-off)  or  the  possibility  of 
atau  dimungkinkannya  penggabungan  beberapa  combining  multiple  accounts;  or  hold  priority 
rekening;  atau  mengadakan  pengaturan  prioritas  setting  receipts  have  the  same  effect,  in  a 
penerimaan  pembayaran  yang  memiliki  dampak  state  where  the  arrangement  or  transaction  is 
yang  sama,  dalam  keadaan  dimana  pengaturan  done mainly as a way to add debt financing or 
atau  transaksi  dilakukan  terutama  sebagai  suatu  finance the purchase of assets. 
cara  untuk  menambah  utang  pembiayaan  atau 
membiayai pembelian aset.  
   
Pada  tanggal  30  September  2019,  seluruh  tagihan  As  at  September  30,  2019,  all  amount  due 
pengguna  jasa  atas  proyek  Tol  Ruas  Pematang  from  customers  of  road  project  of  Pematang 
Panggang - Kayu Agung seksi 4 digunakan sebagai  Panggang – Kayu Agung Toll Road Section 4 
jaminan  atas  utang  bank  PT  Bank  BTPN  Tbk  were used as collateral bank loans of PT Bank 
(Catatan 5).  BTPN Tbk (Note 5). 
   
Pada  tanggal  30  September  2019  dan   As  of  September  30,  2019,  December  31, 
31  Desember  2018,  saldo  pinjaman  Perusahaan  2018,  2017  and  2016,  the  balance  of  loan  to 
kepada  kepada  PT  Bank  BTPN  Tbk   PT  Bank  BTPN  Tbk  amounted  to 
masing-masing  sebesar  Rp  950.000.000.000  dan  Rp 950,000,000,000 and Rp 700,000,000,000, 
Rp 700.000.000.000.  respectively. 

12. PT Bank Maybank Indonesia Tbk 12. PT Bank Maybank Indonesia Tbk
   
Berdasarkan  Perpanjangan  Perjanjian  Line  Based  on  the  Extension  Agreement  of            
Pembiayaan Musyarakah No. 016/Ppj.Musyarakah/  the  Musyarakah  Financing  Line  No.  016/Ppj. 
CDU-CORP/2018  tanggal  17 Oktober  2018,  Musyarakah/CDU-CORP/2018  dated  October 
Perusahaan  memperoleh  fasilitas  kredit  dari  17,  2018,  the  Company  obtained  a  credit 
PT Bank  Maybank  Indonesia  berupa  Musyarakah  facility  from  PT  Bank  Maybank  Indonesia  in 
sebesar  Rp  950.000.000.000  (Sublimit  Fasilitas  the  form  of  Musyarakah  amounted  to  
Line Kafalah) dan fasilitas non-kas loan yang dapat  Rp  950,000,000,000  (Sublimit  Kafalah  Line 
digunakan untuk SKBDN, L/C Rp 175.000.000.000  Facility)  and  non-  cash  loan  that  can  be  used 
dengan  jangka  waktu  pinjaman  sejak  20  Oktober  for  SKBDN,  L  /  C  Rp  175,000,000,000  with  a 
2018  dan  jatuh  tempo  pada  20  Oktober  2019,  loan term from October 20, 2018 and maturing 
dengan suku bunga 8,25% per tahun. 
on  October  20,  2019,  with  an  interest  rate  of 
8.25% per year. 
   

122
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perjanjian  ini  mencakup  batasan  –  batasan  yang  Under  the  agreement  the  Company  is  not 
tidak  diperkenankan  dilakukan  oleh  Perusahaan  allowed  to  do  certain  actions  without  the  prior 
tanpa persetujuan tertulis terlebih dahulu dari bank  written  consent  by  the  bank,  such  as 
antara  lain  memindahkan  hak  dan/atau  transferring the rights and/or eliminate most or 
menghapuskan sebagian  besar  atau  seluruh  harta  all  of  the  assets  of  the  Customer  and/or 
kekayaan  Nasabah  dan/atau  penjamin  atau  guarantor  or  pledging/mortgaging  moving 
menjaminkan/mengagunkan  barang  -  barang  goods  and  immovable  goods  property  of 
bergerak  maupun  barang-barang  tidak  bergerak  the  Customer  and/or  the  Guarantor  in  any 
milik  Nasabah  dan/atau  Penjamin  dengan              way  and  also  to  the  person/party  anyone 
cara bagaimanapun juga dan kepada orang/ pihak  (except    to    sell    in    order    to    conduct   
siapapun   juga   (kecuali   menjual   dalam  rangka 
business   nomal  properties);  filed  a  petition  to 
menjalankan sifat usaha yang nomal); mengajukan 
be  declared  bankrupt  by    the    Commercial  
pemohonan  untuk  dinyatakan  pailit  oleh 
Court    or      apply  delay  payment  of  debts;  
Pengadilan  Niaga  atau  mengajukan  permohonan 
penundaan  pembayaran  utang;  melakukan  doing  dissolution  or  liquidation  based  on  
pembubaran  atau likuidasi  berdasarkan  keputusan  the    decision    of    the    General    Meeting  of 
Rapat  Umum  Pemegang  Saham  (kecuali  Shareholders  (except  for  the  shareholders  of  
pemegang saham Pemerintah Republik lndonesia).  the governments of the Republic of Indonesia). 
   
Pada tanggal 30 September 2019, seluruh tagihan  As  of  September  30,  2019,  all  amount  due 
kepada pengguna jasa atas proyek Jalan Tol Kayu  from  customers  of  the  Kayu  Agung  – 
Agung  -  Palembang  -  Betung  Paket  II  Seksi  II  Palembang – Betung Package II Section 2 Toll 
digunakan  sebagai  jaminan  atas  utang  PT Bank  Road  project  are  used  as  collateral  for  the 
Maybank Indonesia Tbk (Catatan 5).  debts  of  PT  Bank  Maybank  Indonesia  Tbk 
(Note 5). 
   
Pada  tanggal  30  September  2019  dan   As  of  September 30, 2019 and December  31, 
31  Desember  2018,  saldo  pinjaman  Perusahaan  2018,  the  balance  of  loan  to  PT  Bank  
kepada  PT Bank  Maybank  Indonesia  Tbk  masing- Maybank  Indonesia  Tbk  amounted  to 
masing sebesar Rp 949.597.569.443 dan Nihil.   Rp 949,597,569,443 and Nil, respectively. 

13. PT Bank UOB Indonesia 13. PT Bank UOB Indonesia


   
Perusahaan  memperoleh  fasilitas  KMK  sebesar  The  company  obtained  KMK  facilities  in  
Rp 1.200.000.000.000 sesuai dengan perubahan XI  the  amount  of  Rp  1,200,000,000,000  in 
terhadap  perjanjian  kredit  No. 264/05/2018  tanggal  accordance  with  amendment  XI  to  the  credit 
21  Mei  2018  dengan  sublimit  fasilitas  non-kas   agreement  No.  264/05/2018  dated  May  21, 
Rp  1.200.000.000.000.  Fasilitas  tersebut  dapat  2018 with a sub-facility of non-cash facilities of 
digunakan  sampai  dengan  tanggal  18  April  2019.  Rp  1,200,000,000,000.  The  facility  can  be 
Berdasarkan  surat  dari  PT  Bank  UOB  Indonesia   used  until  April  18,  2019.  Based  on  a  
No.  19/CBO/0025  tanggal  15  April  2019  perihal  letter  from  PT  Bank  UOB  Indonesia  
Pemberitahuan  Perpanjangan  Jangka  Waktu  No.  19/CBO/0025  dated  April  15,  2019 
Fasilitas Kredit, jangka waktu fasilitas diperpanjang  concerning  Notification  of  the  Term  of  Credit 
sampai  dengan  18  Mei  2019  dan  Perubahan  XII 
Facility  Extension,  the  facility  period  is 
Terhadap  Perjanjian  Kredit  Nomor  16,  tanggal  7 
extended  until  May  18, 2019 and  Amendment 
Mei  2019  yang  berlaku  sampai  dengan  18  April 
to XII to Credit Agreement Number 16, May 7, 
2020.
2019 which is valid until April 18, 2020. 
 
Perjanjian  ini  mencakup  batasan-batasan  yang  Under  the  agreement  the  Company  is  not 
tidak  diperkenankan  dilakukan  oleh  Perusahaan  allowed  to  do  certain  action  without  the  prior 
tanpa persetujuan tertulis terlebih dahulu dari Bank  written consent by the Bank among others: not 
antara  lain:  tidak  mengubah  bisnis  Perusahaan.  change  the  core  business  of  the  Company. 
Perusahaan harus mempertahankan lisensi penting  The  Company  should  maintain  important 
terkait  dengan  bisnis  Perusahaan  (jika  ada).   licence  regarding  with  the  Company’s 
Tidak melakukan pelepasan aset  secara signifikan,  business (if any). Do not dispose of significant 
tidak  terdapat  perubahan  yang  merugikan    assets,  there  is  no  adverses  changes  to  
kondisi  keuangan  Perusahaan.  Menjaga  rata-       the  Company’s  financial  condition.  Maintain 
rata  kepemilikan  langsung  atau  tidak  langsung        the  average  of  direct  ownership  averages  or 
oleh  Pemerintah  Indonesia  sekurang-kurangnya 
indirect  ownership  of  Government  of  Republic 
51%  sepanjang  periode.  Menyampaikan  progres 
of  Indonesia  at  least  51%  during  the  period. 
pekerjaan bulanan atas proyek yang dibiayai.  
   Deliver  the  progress  of  monthly  work  on  
 

123
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Menyerahkan  seluruh  tagihan  yang  dikeluarkan  the  project  being  financed.  To  submit  all 
atas  proyek  yang  dibiayai.  Menyampaikan  seluruh  amount  due  from  customers  of  projects 
perkara hukum, arbitrase atau perkara administrasi  funded.  To  submit  all  the  litigation,  arbitration 
lainnya.  Memberitahukan  bank  atas  setiap  or other administrative suit. To inform the bank 
perubahan     komposisi     dewan  direksi  dan  dewan  for  every  change  of  the  composition  of  
komisaris.  Memberitahukan  bank  atas  setiap  the  board  of  directors  and  the  board  of 
kegagalan  atau  potensi  kegagalan  dan  commissioners.  To  inform  the  bank  for  any 
menyampaikan  informasi  lainnya  sesuai  dengan  failure or potential failure and to inform of other 
permintaan bank.  information according to the bank’s request.                    
   
Pada  tanggal  30  September  2019,  seluruh  tagihan  As  of  September  30,  2019,  all  amount  due 
kepada  pengguna  jasa  atas  proyek  Pembangunan  from  customers  of  the  Constructions  of  Bener 
Bendungan  Bener  Kab.  Purworejo  Paket  2  (MYC),  Dam  Purworejo  District  package  2  (MYC) 
Pengembangan  Bandara  Hasanuddin  Makassar,  Project,  the  Development  of  Hasanuddin 
Pembangunan  Rest  Area  Jalan  Tol  Ruas  Airport in Makassar, the Constructions of Rest 
Bakauheni  Terbanggi  Besar  Paket  II,  dan  Area  at  Bakauheni  Terbanggi  Besar  Package 
Revitalisasi  Kawasan  Pusat  Pelatihan  Olahraga  II  Toll  Road  Project,  and  the  Revitalization  of 
Pelajar  Ragunan  digunakan  sebagai  jaminan  atas  the  Ragunan  Student  Sports  Training  Center 
utang bank PT Bank UOB Indonesia (Catatan 5). Area  were  used  as  collateral  bank  loans  of  
PT Bank UOB Indonesia (Note 5). 
   
Perusahaan  diwajibkan  untuk  mempertahankan  Under  the  agreement  the  Company  should 
debt  to  equity  ratio  maksimal  3  (tiga)  kali,  debt  maintain  its  debt  to  equity  ratio  maximum  3 
service coverage ratio maksimal 1,5 kali dan current  (three)  times,  debt  service  coverage  ratio 
ratio  maksimal  1  kali.  Pemenuhan  pembatasan  maximum  1.5  times  and  current  ratio 
pinjaman  bank  dilaporkan  oleh  Perusahaan  setiap  maximum  1  time.  The  fulfillment  of  bank 
akhir tahun dan akan dievaluasi oleh PT Bank UOB  lending  restriction  will  be  reported  by      
Indonesia. the Company at the end of the year and will be 
evaluated by PT Bank UOB Indonesia. 
   
Pada  tanggal  30  September  2019  dan   As  of  September 30,  2019 and December 31, 
31  Desember  2018,  saldo  pinjaman  Perusahaan  2018,  the  balance  of  loan  to  PT  Bank  UOB 
kepada  PT  Bank  UOB  Indonesia  masing-  Indonesia  amounted  to  Rp  869,689,359,176 
masing  sebesar  Rp  869.689.359.176  dan   and Rp 335,666,043,122, respectively. 
Rp 335.666.043.122.

14. PT Bank DBS Indonesia 14. PT Bank DBS Indonesia

Pada  tanggal  20  Maret  2019,  Perusahaan  As  of  March  20,  2019,  the  Company  signed 
menandatangani  Perubahan  Ketiga  atas  Perjanjian  into  Third  Amandment  of  Banking  Facilities 
Fasilitas  Perbankan  No.  091/PFPA-DBSI/III/1- Agreement  No.  091/PFPA-DBSI/III/1-2/2019 
2/2019    dengan  PT  Bank  DBS  Indonesia  atas  with  PT  Bank  DBS  Indonesia  of  maximum 
fasilitas  gabungan  maksimum  sebesar  combined  facilities  amounted  to                      
Rp 500.000.000.000.  Sublimit  fasilitas  tersebut  Rp  500,000,000,000.  Sublimit  for  this  facility 
terdiri  dari  fasilitas  pembiayaan  impor  (LC)  sebesar  consist  of  impor  financing  facilities  amounted 
Rp  200.000.000.000,  Fasilitas  jaminan  perbankan  to  Rp  200,000,000,000,  SKBDN  Banking 
SKBDN  sebesar  Rp  200.000.000.000,    fasilitas  Facilities  amounted  to  Rp  200,000,000,000,  
tersebut   terdiri   dari   fasilitas   pembiayaan   impor  in  the  form  of  uncommitted  trust  receipt  
berupa    uncommitted  trust  receipt  facility  sebesar  facility  amounted  to  Rp  200,000,000,000, 
Rp  200.000.000.000,  uncommitled  revolving  credit  uncommitled  revolving credit facility  amounted 
facility  sebesar  Rp  200.000.000.000,  dan  fasilitas  to  Rp  200,000,000,000  and  SPS  facility 
SPS sebesar Rp 300.000.000.000. Fasilitas tersebut  amounted  to  Rp  300,000,000,000.  
dapat  digunakan  sampai    16  Pebruari  2020  dan  The  availability  period  of  facility  is  until 
akan ditinjau kembali oleh pihak Bank.   February  16,  2020  and  will  be  evaluated  by  
the bank.
   
Perusahaan diwajibkan untuk mempertahankan debt  Under  the  agreement,  the  Company  should 
service  coverage  ratio  minimal  1,5  kali  dan  current  maintain debt service coverage ratio minimum 
ratio  minimal  1  kali.  Pemenuhan  pembatasan  1.5  times  and  current  ratio  minimum  1  time.  
pinjaman  bank  dilaporkan  oleh  Perusahaan  setiap  The  fulfillment  of  bank  lending  restriction  will 
akhir tahun dan akan dievaluasi oleh PT Bank DBS  be  reported  by  the  Company  at  the  end  of  
Indonesia.  the  year  and  will  be  evaluated  by  PT  Bank 
  DBS Indonesia. 
   

124
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Per 30 September 2019, tagihan kepada pengguna  As  of  September  30,  2019,  all  amount  due 
jasa  atas  Proyek  Pabrik  Baja  WKI  Cikande,  from  customers  of  the  Constructions  of  WKI 
Underpass MM 2100 Cikarang Barat, GI Sangatta –  Steel Factory at Cikande, Underpass MM 2100 
Maloy  Section  1,  GI  Rengat  –  Tembilahan,  Cikarang  Barat,  GI  Sangatta  –  Maloy  Section 
Transmisi 150 Kv GI Sangatta – GI Maloy Section 3,  1, GI Rengat – Tembilahan, Transmisi 150 Kv 
dan  Pembangunan  Sub  Gardu  Induk  BSH  dan  GI  Sangatta  –  GI  Maloy  Section  3,  and  
Penarikan Kabel Power Menuju Gardu Hubung BSH  the  Constructions  of  Sub-Base  Submission 
digunakan  sebagai  jaminan  atas  utang  pada  BSH  and  Cable  Withdrawal  Towards  BSH 
PT Bank DBS Indonesia (Catatan 5).  Substation  Power  is  used  as  collateral  for  
the debts of PT Bank DBS Indonesia (Note 5). 
 
Pada  tanggal  30  September  2019  dan   As  of  September 30,  2019 and December  31, 
31  Desember  2018  saldo  pinjaman  Perusahaan  2018  the  balance  of  loan  to  PT  Bank  DBS 
kepada  PT Bank  DBS  Indonesia  masing-masing  Indonesia  amounted  to  Rp  858,135,500,000 
sebesar Rp 858.135.500.000 dan Nihil.   and Nil, respectively. 

15. Bank of China Ltd 15. Bank of China Ltd

Perusahaan  memperoleh  fasilitas  pinjaman  tanpa  The  Company  obtained  a  non-commited  loan 
komitmen  sebesar  Rp  600.000.000.000  dengan  facility  amounted  to  Rp  600,000,000,000  with 
perjanjian  fasilitas  No.  56  tanggal  21  Agustus  2018  facility  agreement  No.  56  dated  August  21, 
dan  dilegalisasi  oleh  Notaris  A.  Wahono  P,  S.H.  2018  and  legalized  by  Notary  A.  Wahono  P, 
Fasilitas  tersebut  dapat  digunakan  sampai  dengan  S.H.  The  facility  can  be  used  until  August  21, 
tanggal 21 Agustus 2019.  2019. 
   
Perjanjian ini mencakup batasan-batasan yang tidak  This agreement covers restrictions that are not 
diperkenankan  dilakukan  oleh  Perusahaan  tanpa  permitted  by  the  Company  without  the  Bank's 
persetujuan tertulis terlebih dahulu dari Bank antara  prior  written  approval,  including  not  changing 
lain tidak mengubah bisnis Perusahaan, Perusahaan  the  Company's  business,  the  Company  must 
harus  mempertahankan  lisensi  penting  terkait  maintain  important  licenses  related  to 
dengan  bisnis  Perusahaan  (jika  ada).  Tidak  the  Company's  business  (if  any).  Doesn’t 
melakukan  pelepasan  aset  secara  signifikan,  tidak  release  significant  assets,  there  are  no 
terdapat  perubahan  yang  merugikan  kondisi  changes that have a negative to the Company's 
keuangan  Perusahaan.  Menjaga  rata-rata  financial  condition.  Maintain  an  average  direct 
kepemilikan  langsung  atau  tidak  langsung  oleh  or  indirect  ownership  by  the  Government  of 
Pemerintah  Indonesia  sekurang-kurangnya  51%  Indonesia  of  at  least  51%  throughout 
sepanjang  periode.  Menyampaikan  progress  the  period.  Delivering  monthly  work  progress 
pekerjaan  bulanan  atas  proyek  yang  dibiayai.  on projects financed. Submit all bills issued for 
Menyerahkan seluruh tagihan yang dikeluarkan atas  projects  financed.  Deliver  all  legal  cases, 
proyek  yang  dibiayai.  Menyampaikan  seluruh  arbritase  or  other  administrative  cases.  Inform 
perkara  hukum,  arbitrase  atau  perkara  administrasi  the  bank  of  any  failure  or  potential  failure  and 
lainnya.  Memberitahukan  bank  atas  setiap  submit  other  information  in  accordance  with 
kegagalan  atau  potensi  kegagalan  dan  Bank of China Ltd 's request.  
menyampaikan  informasi  lainnya  sesuai  dengan 
permintaan Bank of China Ltd. 
   
Perusahaan diwajibkan untuk mempertahankan debt  The  company  is  required  to  maintain  a 
to  equity  ratio  maksimal  3  (tiga)  kali,  debt  service  maximum debt to equity ratio of 3 (three) times, 
coverage  ratio  maksimal  1  kali  dan  current  ratio  a  maximum  debt  service  coverage  ratio  of  1 
maksimal  1  kali.  Pemenuhan pembatasan  pinjaman  time  and  a  maximum  current  ratio  of  1  time. 
bank dilaporkan Perusahaan setiap akhir tahun dan  Fulfillment  of  bank  loan  restrictions  is  reported 
akan dievaluasi oleh Bank of China Ltd.  by  the  Company  at  the  end  of  each  year  and 
will be evaluated by Bank of China Ltd. 
   
Pada  tanggal  30  September  2019  seluruh  tagihan  As of September 30, 2019, all amount due from 
kepada  pengguna  jasa  atas  proyek  Pembangunan  customer  of  the  Tapin  Dam  Construction 
Bendungan  Tapin,  Pembangunan  Bendungan  Project,  Civil  Works  for  Construction  of  Karian 
Multipurpose  Karian,  Revitalisasi  TPA  Regional  Multipurpose  Dam  Project,  Sarbagita  Suwung 
Sarbagita  Suwung  (MYC)  dan  Pekerjaan  Jalan  Tol  Regional  Landfill  Revitalization  (MYC)  and 
Cisumdawu  Phase  II  digunakan  sebagai  jaminan  Cisumdawu  Phase  II  Toll  Road  Project  was 
atas utang Bank of China Ltd (Catatan 5).  used  as  collateral  for  Bank  of  China  Ltd 
(Note 5). 
   

125
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018,  saldo  pinjaman  Perusahaan  kepada  2018,  the  balance  of  Company’s  loan  to 
Bank  of  China  Ltd.  masing-masing  sebesar  Bank  of  China  Ltd.  each  amounted  to 
Rp 600.000.000.000 dan Rp 500.000.000.000.  Rp  600,000,000,000  and  Rp  500,000,000,000, 
respectively. 

16. PT Bank BNP Paribas Indonesia 16. PT Bank BNP Paribas Indonesia

Perusahaan  menerima  Surat  Pemberitahuan  The  Company  received  a  Notice  of  Credit 
mengenai  Perpanjangan  Jangka  Waktu  Kredit  Repayment  Period  No.LC/LD-431/LA/2019 
No.LC/LD-431/LA/2019  tanggal  29  Maret  2019  dari     dated  March  29,  2019  from  PT  Bank  BNP 
PT  Bank  BNP  Paribas  Indonesia  atas  fasilitas  Paribas  Indonesia  for  Revolving  Loans  facility 
Pinjaman  Bergulir  sebesar  Rp 500.000.000.000  amounted  to  Rp  500,000,000,000  to  finance 
untuk  membiayai  kebutuhan  modal  kerja  dengan  working  capital  needs  with  LC/SKBDN 
sublimit  LC/SKBDN  dan  Bank  Garansi  sebesar        sublimits  and  Bank  Guarantee  amounted  to    
Rp 500,000,000,000 with the facility drawdown 
Rp  500.000.000.000  dengan  jangka  waktu 
period  up  to  March  31,  2020  and  will  be 
penarikan  fasilitas  sampai  dengan  31  Maret  2020 
reviewed  by  the  PT  Bank  BNP  Paribas 
dan  akan  ditinjau  lagi  oleh  pihak  PT  Bank  BNP  Indonesia. 
Paribas Indonesia. 
   
Perusahaan diwajibkan untuk mempertahankan debt  Under  the  agreement  the  Company  should 
to  equity  ratio  maksimum  3  kali,  interest  service  maintain  debt  to  equity  ratio  maximum  3 
coverage  ratio  minimal  1.5  kali  dan  current  ratio  (three)  times,  interest  service  coverage  ratio 
minimal  1  kali.  Pemenuhan  pembatasan  pinjaman  minimum 1.5 times and current  ratio minimum 
bank dilaporkan oleh Perusahaan setiap akhir tahun  1  time.  The  fulfillment  of  bank  lending 
dan  akan  dievaluasi  oleh  PT  Bank  BNP  Paribas  restriction  will  be  reported  by  the  Company  at 
Indonesia.  the  end  of  the  year  and  will  be  evaluated  by 
the PT Bank BNP Paribas Indonesia. 
 
Per  30  September  2019,  tagihan  kepada  pengguna  As  of  September  30,  2019,  all  amount  due 
jasa  atas  proyek  Pembangunan  Bendungan  Rukoh  from  customers  of  the  Rukoh  Dam 
Kabupaten  Pidie-2  (MYC)  digunakan  sebagai  Development  Project  Pidie-2  District  (MYC) 
jaminan  atas  utang  pada  PT Bank  BNP  Paribas  are used as collateral for the debts of PT Bank 
Indonesia (Catatan 5).  BNP Paribas Indonesia (Note 5). 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018,  saldo  pinjaman  Perusahaan  kepada  kepada  2018,  the  balance  of  loan  to  PT  Bank  
PT  Bank  BNP  Paribas  Indonesia  masing-masing  BNP  Paribas  Indonesia  amounted  to  
sebesar Rp 498.750.000.000 dan Nihil.  Rp 498,750,000,000 and Nil, respectively. 

17. PT Bank OCBC NISP Tbk 17. PT Bank OCBC NISP Tbk

Berdasarkan  Akta  notaris  dari  Engawati  Gazali,  SH  Based on the Notary Deed of Engawati Gazali, 


No.  39  tanggal  24  Mei  2018  tentang  Pemberian  SH  No.  39  dated  May  24,  2018  concerning 
Fasilitas  Receivable  Purchase,  dan  perubahannya  the Provision of Receivable Purchase Facilities, 
pada  No.  179/CBL/PKS/V/2019,  tanggal  23  Mei  and Amendments to No. 179/CBL/PKS/V/2019, 
2019,  Perusahaan  memiliki  perjanjian  kerja  sama  the  Company  has  a  cooperation  agreement 
dengan  PT  Bank  OCBC  NISP  Tbk  sehubungan  with  PT  Bank  OCBC  NISP  Tbk  in  connection 
dengan  pembelian  piutang  yang  dimiliki  Pemasok  with  the  purchase  of  receivables  owned  by 
terhadap  Mitra  Bisnis  atas  dasar  invoice  yang  telah  Suppliers  against  Business  Partners  based  on 
diakseptasi  oleh  Mitra  Bisnis.  Limit  fasilitas  yang  invoices that  have been accepted by Business 
diberikan Bank adalah maksimum sebesar ekuivalen  Partners.  The  limit  of  facilities  provided  by 
Rp  1.500.000.000.000.  Bunga  diskonto  adalah  the  Bank  is  a  maximum  of  equivalent  to 
8,95%  per  tahun  dan  akan  dibebankan  kepada  Rp  1,500,000,000,000.  Discount  interest  is 
pemasok.  Perjanjian  Kerjasama  berlaku  untuk  8,95%  per  year  and  will  be  charged  by 
jangka waktu satu tahun sampai dengan 1 Mei 2020. the  supplier.  The  Cooperation  Agreement  is 
valid for one year up to May 1, 2020.
   

126
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perusahaan  diwajibkan  untuk  mempertahankan  The Company are required to maintain financial 
rasio  keuangan  sebagai  berikut:  current  ratio  ratios as follows: current ratio of at least 1 (one) 
minimal 1 (satu) kali, debt to equity ratio maksimal 3  time,  maximum  debt  to  equity  ratio  3  (three) 
(tiga) kali dan debt service coverage ratio minimal 1  times and debt service coverage ratio at least 1 
(satu)  kali.  Pemenuhan  pembatasan  pinjaman  bank  (one)  time.  Compliance  with  bank  loan 
dilaporkan  oleh  Perusahaan  setiap  akhir  tahun  dan  restrictions  is  reported  by  the  Company  at 
akan dievaluasi oleh PT Bank OCBC NISP Tbk. the  end  of  each  year  and  will  be  evaluated  by 
the PT Bank OCBC NISP Tbk.
 
18. PT Bank Mizuho Indonesia 18. PT Bank Mizuho Indonesia

Berdasarkan  Perjanjian  Pembiayaan  Pemasok  Based  on  the  Supplier  Financing  Agreement 
No.  038/SFA/MZH/0418  tanggal  30  April  2018,  No.  038/SFA/MZH/0418  dated  April  30,  2018, 
PT  Bank  Mizuho  Indonesia  menyediakan  fasilitas  PT  Bank  Mizuho  Indonesia  provides  supplier 
pembiayaan  pemasok  tanpa  komitmen  kepada  financing  facilities  without  commitment  to 
Perusahaan.  Limit  fasilitas  yang  diberikan  Bank  the  Company.  The  limit  of  facilities  provided 
adalah  maksimum  sebesar  Rp  1.000.000.000.000.  by  the  Bank  is  a  maximum  of 
Perjanjian  Kerjasama  berlaku  untuk  jangka  waktu  Rp  1,000,000,000,000.  The  Cooperation 
satu  tahun  sampai  dengan  dengan  30  April  2020  Agreement is valid for one year up to  April 30, 
sesuai dengan Perubahan No. 552/AMD/MZH/0419.  2020  as  stated  in  Amendment  No.  552/AMD/ 
  MZH/0419.
   
Selama Perusahaan memiliki kewajiban yang belum  As  long  as  the  Company  has  an  outstanding 
diselesaikan  kepada  PT  Bank  Mizuho  Indonesia,  obligation  to  the  PT  Bank  Mizuho  Indonesia, 
Perusahaan memiliki batasan-batasan yakni:  the Company has limitations, namely:
   
a.  Perusahaan  tidak  akan  mengadakan  transaksi  a.  The company will not hold any transactions 
apapun dengan afiliasi lain  with other affiliates 
b.  Menggabungkan diri dengan perusahaan lain  b.  Merge with other companies 
c.  Membubarkan struktur Perusahaan  c.  Dissolve the Company's structure 
d.  Menimbulkan  atau  membebankan  atau  d.  Inflict or impose or permit the emergence of 
mengizinkan timbulnya gadai  pawning 
e.  Menjual,  menyewa,  memindahkan  atau  e.  Selling,  leasing,  moving  or  releasing  all 
melepaskan semua usaha  businesses 
f.  Secara signifikan mengubah sifat usahanya  f.  Significantly  changes  the  nature  of 
the business 
g.  Melakukan  tindakan  lain  yang  menyebabkan  g.  Take other actions that cause the Company 
Perusahaan tidak dapat memenuhi kewajiban   to be unable to fulfill obligations 

Perusahaan  diwajibkan  untuk  mempertahankan  The  Company  is  required  to  maintain  financial 
rasio  keuangan  sebagai  berikut:  current  ratio  ratios as follows: current ratio of at least 1 (one) 
minimal  1  (satu)  kali,  debt  to  equity  ratio  maksimal  time,  maximum  debt  to  equity  ratio  3  (three) 
3 (tiga) kali dan debt service coverage ratio minimal  times and debt service coverage ratio at least 1 
1  (satu)  kali.  Pemenuhan  pembatasan  pinjaman  (one)  time.  The  compliance  of  bank  loan 
bank dilaporkan oleh Perusahaan setiap akhir tahun  restrictions  is  reported  by  the  Company  at   
dan  akan  dievaluasi  oleh  PT  Bank  Mizuho  the  end  of  each  year  and  will  be  evaluated  by 
Indonesia.  the PT Bank Mizuho Indonesia.
 
19. Bank of Tokyo Mitsubishi UFJ, Ltd. 19. Bank of Tokyo Mitsubishi UFJ, Ltd.
   
Perusahaan  memperoleh  fasilitas  pinjaman  tanpa  The  Company  obtained  a  uncommitted  loan 
komitmen sebesar Rp 800.000.000.000 dan fasilitas  facility  amounted  to  Rp  800,000,000,000  and 
pinjaman  terhadap  tagihan  sebesar  loan  against  invoice  facility  amounted  to       
Rp  300.000.000.000  sesuai  dengan  perjanjian  Rp  300,000,000,000  according  to  credit 
kredit  No.  18-0219-GC-LN  tanggal  17  Desember  agreement  No.  18-0219-GC-LN  dated  
2018.  Fasilitas  tersebut  dapat  digunakan  sampai  December  17,  2018.  The  facility  can  be  used 
dengan tanggal 17 Desember 2019. until December 17, 2019.
   

127
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perjanjian  ini  mencakup  batasan-batasan  yang  Under  the  agreement  the  Company  is  not 
tidak  diperkenankan  dilakukan  oleh  Perusahaan  allowed  to  do  certain  actions  without  the  prior 
tanpa persetujuan tertulis terlebih dahulu dari Bank  written  consent  by  the  Bank,  among  others:  
antara  lain  tidak  mengubah  bisnis  Perusahaan,  do  not  change  the  Company's  business, 
Perusahaan harus mempertahankan lisensi penting  the  Company  must  maintain  a  important 
terkait  dengan  bisnis  Perusahaan  (jika  ada).  Tidak  licenses  related  to  the  business  of  
melakukan  pelepasan  aset  secara  signifikan,  tidak  the  Company  (if  any).  Do  not  dispose 
terdapat  perubahan  yang  merugikan  kondisi  significant  assets,  there  are  no  adverse 
keuangan  Perusahaan.  Menjaga  rata  -  rata  changes  in  Company’s  financial  condition. 
kepemilikan langsung   atau   tidak   langsung   oleh  Keeping  the  average  ownership  directly  or 
Pemerintah  Indonesia  sekurang-kurangnya  51%  indirectly, by  the  Government  of  Indonesia for 
sepanjang  periode.  Menyampaikan  progress  at  least  51%  over  the  period.  Delivering 
pekerjaan  bulanan  atas  proyek  yang  dibiayai.  monthly  progress  of  work  on  the  project 
Menyerahkan  seluruh  tagihan  yang  dikeluarkan  financed. Submit the bill issued on the project 
atas  proyek  yang  dibiayai.  Menyampaikan  seluruh  financed.  Delivering  the  entire  case  law, 
perkara hukum, arbitrase atau perkara administrasi  arbritase or other administrative matters. Notify 
lainnya.  Memberitahukan  Bank  of  Tokyo-Mitsubishi  the Bank of Tokyo-Mitsubishi UFJ, Ltd for any 
UFJ,  Ltd  atas  setiap  kegagalan  atau  potensi  failure  or  potential  failure  and  convey  other 
kegagalan  dan  menyampaikan  informasi  lainnya  information  as  requested  by  the  Bank  of 
sesuai  dengan  permintaan  Bank  of  Tokyo- Tokyo-Mitsubishi UFJ, Ltd.  
Mitsubishi UFJ, Ltd. 
   
Perusahaan  diwajibkan  untuk  mempertahankan  Under  the  agreement  the  Company  should 
debt  to  equity  ratio  maksimal  3  (tiga)  kali  dan  maintain  a  maximum  debt  equity  ratio  of  3 
current  ratio  maksimal  1  kali.  Pemenuhan  (three)  times  and  a  maximum  of  1  time  for  
pembatasan pinjaman bank dilaporkan Perusahaan  the  current  ratio.  Fulfillment  restrictions  on 
setiap akhir tahun dan akan dievaluasi oleh Bank of  bank  lending  is  reported  by  the  Company  at 
Tokyo-Mitsubishi UFJ, Ltd. end  of  the  year  and  will  be  evaluated  by  
the Bank of Tokyo-Mitsubishi UFJ, Ltd. 
   
Pada  tanggal  30  September  2019,  seluruh  tagihan  As  of  September  30,  2019,  all  amount  due 
kepada  pengguna  jasa  atas  Proyek  Pembangunan  from  customers  of  the  Development  of  PLTA 
PLTA Wado digunakan sebagai jaminan atas utang  Wado  were  used  as  collateral  bank  loans  of 
Bank of Tokyo-Mitsubishi UFJ, Ltd (Catatan 5).  Bank of Tokyo-Mitsubishi UFJ, Ltd (Note 5).  
   
Pada  tanggal  30  September  2019  dan   As  of  September 30,  2019 and December 31, 
31  Desember  2018,  saldo  pinjaman  Perusahaan  2018,  the  balance  of  loan  to  Bank  of  Tokyo 
kepada  Bank  of  Tokyo  Mitsubishi  UFJ,  Ltd.   Mitsubishi  UFJ,  Ltd.  amounted  to  Rp  663,819 
masing-masing  sebesar  Rp  663.819  dan   and Rp 168,112,661,042, respectively. 
Rp 168.112.661.042. 
 
20. PT Bank CIMB Niaga Tbk – Unit Usaha Syariah 20. PT Bank CIMB Niaga Tbk – Syariah
Business Unit

Perusahaan  memperoleh  Fasilitas  Pembiayaan  The Company obtained a Financing Facilitiy of 


Transaksi  Khusus  Musyarakah  sebesar  Musyarakah  Special  Transaction  amounted 
Rp 500.000.000.000  sesuai  Surat  Perpanjangan  to  Rp 500,000,000,000  according  to 
Fasilitas  Pembiayaan  No.  038/OL/CBGII/II/19  Extension  Letter  of  Financing  Facility 
tanggal  12 Pebruari  2019.  Fasilitas  tersebut  dapat  No.  038/OL/CBGII/II/19  dated  February  12, 
digunakan hingga 20 Desember 2020.  2019.  The  facility  can  be  used  until 
December 20, 2020. 

Pinjaman  ini  dijamin  dengan  tagihan  kepada  These  loans  are  collateralized  with  all  amount 
pengguna jasa atas proyek Pembangunan Jalan Tol  due  from  customer  of  Kayu  Agung  – 
Kayu Agung – Palembang – Betung Paket IV Seksi  Palembang  –  Betung  Toll  Road  Package  IV 
3B (Catatan 5).  Section 3B (Note 5). 
   
Perusahaan diwajibkan untuk mempertahankan debt  The Company should maintain interest bearing 
(ad. Interest bearing debt) to equity ratio maksimum  debt  to  equity  ratio  maximum  3  times,  interest 
3 kali, interest service coverage ratio minimal 1,5 kali  service  coverage  ratio  mimimum  1.5  and 
dan current ratio minimal 100%.  current ratio minimum 100%. 
   

128
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pemenuhan  pembatasan  pinjaman  bank  dilaporkan  The fullfilment of bank lending restriction will be 
oleh  Perusahaan  setiap  akhir  tahun  dan  akan  reported  by  the  Company  at  the  end  of 
dievaluasi  oleh  PT  Bank  CIMB  Niaga  Tbk  –  Unit  the  year  and  will  be  evaluated  by  PT  Bank 
Usaha Syariah.  CIMB Niaga Tbk – Syariah Business Unit. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  Perusahaan  kepada  2018  the  balance  of  Company’s  loan  to 
kepada  PT  Bank  CIMB  Niaga  Tbk  -  Unit  Usaha  PT  Bank  CIMB  Niaga  Tbk  –  Syariah  Business 
Syariah  masing-masing  sebesar  Nihil  dan  Unit amounted to Nil and Rp 500,000,000,000, 
Rp 500.000.000.000.  respectively. 

21. Sindikasi Tol Cinere Serpong 21. Syndication Cinere Serpong Toll Road
 
Berdasarkan  Akta  Perjanjian  Kredit  No.  20  tanggal    Based  on  the  Deed  of  Credit  Agreement 
23 April 2018 yang dibuat di hadapan Notaris Pratiwi  No. 20 dated April 23, 2018 from Notary Pratiwi 
Handayani,  S.H.  dan  Perubahan  I  Atas  Akta  Handayani,  S.H.  and  Amendment  I  To  Credit 
Perjanjian  Kredit  No.  20  tanggal  23  April  2018  Agreement  No.  20  dated  April  23,  2018  No.  1 
No.  1  tanggal  31  Agustus  2018,  perusahaan  telah  dated  August  31,  2018,  the  Company  has 
memperoleh  fasilitas  kredit  sindikasi  dari  obtained  a  syndicated  credit  facility  from 
PT Bank CIMB Niaga Tbk, PT Bank DBS Indonesia,  PT  Bank  CIMB  Niaga  Tbk,  PT  Bank  DBS 
PT  Bank  KEB  Hana  Indonesia  sebesar  Indonesia,  PT  Bank  KEB  Hana  Indonesia 
Rp  1.480.000.000.000.  Suku  bunga  yang  berlaku  amounted  to  Rp  1,480,000,000,000. 
adalah  sebesar  JIBOR  1  M  ditambah  dengan  The applicable  interest  rate is JIBOR 1 M plus 
marjin  per  tahun,  dengan  jangka  waktu  fasilitas  a margin per year, with a facility period of up to 
sampai  dengan  18  bulan  dari  tanggal  Perjanjian  18  months  from  the  date  of  the  Facility 
fasilitas.  agreement. 
     
Pemenuhan  pembatasan  pinjaman  bank  dilaporkan    The  fulfillment  of  bank  loan  restrictions  is 
oleh  Perusahaan  setiap  akhir  tahun  dan  akan  reported  by  the  Company  at  the  end  of  each 
dievaluasi  oleh  bank.  Jaminan  yang  diberikan  year  and  will  be  evaluated  by  the  bank. 
secara paripasu pada untuk fasilitas kredit ini adalah  The  guarantees  that  are  extended  extensively 
tagihan/piutang  dari  proyek  yang  dibiayai  diikat  for  this  credit  facility  are  bills/receivables  from 
fidusia  dengan  nilai  objek  jaminan  sebesar  100%  projects financed by a fiduciary with a collateral 
dari nilai kontrak dan tagihan atas pendapatan klaim  object  value  of  100%  from  the  contract  value 
asuransi proyek yang dibiayai diikat secara Fidusia.  and  a  claim  for  project  insurance  claim 
financed by Fiduciary. 
   
Pada tanggal 30 September 2019, seluruh tagihan  As  of  September  30,  2019,  all  amount  due 
kepada  pengguna  jasa  atas  proyek  Jalan  Tol  from  customers  of  the  Cinere  Serpong  Toll 
Cinere  Serpong  digunakan  sebagai  jaminan  Road project are used as collateral (Note 5). 
(Catatan 5). 
     
Perusahaan diwajibkan untuk mempertahankan debt    The  Company  is  required  to  maintain  a 
(ad. Interest bearing debt) to equity ratio maksimum  maximum  of  3  times  the  debt  (ad.  Interest 
3  kali,  interest  service  coverage  ratio  minimal  1,5  bearing  debt)  to  equity  ratio,  a  minimum 
kali, debt service coverage ratio minimal 1,5 kali dan  interest  service  coverage  ratio  of  1.5  times,  a 
current ratio minimal 1,00 kali.  minimum  debt  service  coverage  ratio  of  1.5 
times and a current ratio of at least 1.00 time. 
     
Pada tanggal 30 September 2019 dan 31 Desember    As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  Perusahaan  kepada  PT  Bank  2018  the  balance  of  the  Company's  loans  to 
CIMB  Niaga  Tbk  sebesar  Rp  325.964.466.010  PT  Bank  CIMB  Niaga  Tbk  amounted  to 
dan  Rp  267.189.000.000;  PT  Bank  DBS  Rp  325,964,466,010  and  Rp  267,189,000,000; 
Indonesia  sebesar  Rp  217.309.644.007  dan  PT  Bank  DBS  Indonesia  amounted  to 
Rp  178.126.000.000;  dan  PT  Bank  KEB  Hana  Rp  217,309,644,007  and  Rp  178,126,000,000; 
Indonesia  sebesar  Rp  99.653.830.831  dan  and  PT  Bank  KEB  Hana  Indonesia  amounted 
Rp 81.685.000.000.  to Rp 99,653,830,831 and Rp 81,685,000,000, 
  respectively. 
 
 
 
 
 

129
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
22. PT Bank BNI Syariah 22. PT Bank BNI Syariah

Berdasarkan Akta notaris dari M. Kholid Artha, S.H.,  Based  on  the  Notary  Deed  of  M.  Kholid  Artha, 
No. 25 tanggal 5 April 2018 tentang Addendum Akad  S.H.,  No.  25  dated  April  5,  2018  concerning 
Kafalah  Bil  Ujroh  dan  perubahannya  pada  Addendum  Akad  Kafalah  Bil  Ujroh  and 
No.  014/ADD-ADMP/2019,  tanggal  26  April  2019,  the  amendment  to  No.  014/ADD-ADMP/2019, 
Perusahaan  memiliki  perjanjian  kerja  sama  dengan  dated  April  26,  2019,  the  Company  has  a 
PT  Bank  BNI  Syariah  sehubungan  dengan  cooperation  agreement  with  PT  Bank  BNI 
pembelian  piutang  yang  dimiliki  Pemasok  terhadap  Syariah  in  connection  with  the  purchase  of 
Mitra  Bisnis  atas  dasar  invoice  yang  telah  receivables  owned  by  the  Supplier  against 
diakseptasi  oleh  Mitra  Bisnis.  Limit  fasilitas  yang  the  Business  Partner  on  the  basis  of 
diberikan Bank adalah maksimum sebesar ekuivalen  the  invoice  that  has  been  accepted  by 
Rp  500.000.000.000.  Bunga diskonto  adalah  8,00%  the Business Partner. The facility limit provided 
per  tahun  dan  akan  dibebankan  kepada  pemasok.  by  the  Bank  is  a  maximum  of  equivalent 
Perjanjian  Kerjasama  berlaku  untuk  jangka  waktu  Rp 500,000,000,000. The discounted interest is 
satu tahun sampai dengan 4 April 2020. 8.00%  per  annum  and  will  be  charged  to 
the  supplier.  The  Cooperation  Agreement  is 
valid for a period of one year until 4 April 2020.

Perusahaan diwajibkan untuk mempertahankan debt  Under  the  agreement,  the  Company  should 


to  equity  ratio  minimal  4  kali  dan  current  ratio  maintain  debt  to  equity  ratio minimum  4  (four) 
minimal  1  kali.  Pemenuhan  pembatasan  pinjaman  times  and  current  ratio  minimum  1  time.  
bank dilaporkan oleh Perusahaan setiap akhir tahun  The  fulfillment  of  bank  lending  restriction  will 
dan akan dievaluasi oleh bank.  be  reported  by  the  Company  at  the  end  of  
the year and will be evaluated by the bank. 

Pada  tanggal  30  September  2019,  seluruh  tagihan  As  of  September  30,  2019,  all  amount  due 
kepada  pengguna  jasa  atas  Proyek  Bendungan  from  customers  of  the  Komering  II/Tiga  Dihaji 
Komering II / Tiga Dihaji Paket II digunakan sebagai  Package II Dam Project was used as collateral 
jaminan  atas  utang  PT  Bank  BNI  Syariah  (Catatan  bank loans of PT Bank BNI Syariah (Note 5).  
5).  

Pada tanggal 30 September 2019 dan 31 Desember    As  of  September  30,  2019  and  December  31, 


2018, saldo pinjaman Perusahaan kepada PT Bank  2018,  the  balance  of  the  Company's  loans  to 
BNI Syariah masing-masing sebesar Nihil.  PT  Bank  BNI  Syariah  amounted  to  Nil, 
  respectively. 

Entitas Anak – WBP Subsidiary – WBP


   
1. PT Bank BRIsyariah Tbk 1. PT Bank BRIsyariah Tbk
   
Berdasarkan  perjanjian  pemberian  line  facility  Based  Musyarakah  facility  agreement 
Musyarakah  No.  13  tanggal  17  Oktober  2016  dan  No.  13  dated  October  17,  2016,  and  this 
fasilitas  ini  telah  diperpanjang  berdasarkan   facility  has  recently  been  extended  based 
surat  persetujuan  perpanjangan  pembiayaan   on  the  loan  extension  approval  letter 
No.  B.101/OL/CBG/VIII/2018  tanggal  23  Agustus  No.  B.101OL/CBG/VIII/2018  dated  August 
2018,  dengan  kondisi  dan  persyaratan  sebagai  23, 2018, with the following conditions: 
berikut: 
 
a.  Plafon Rp 600.000.000.000;  a.  Initial ceiling of Rp 600,000,000,000; 
 
b.  Plafon perpanjangan Rp 495.000.000.000;  b.  Extension ceiling of Rp 495,000,000,000; 
 
c.  Jangka  waktu  fasilitas maksimal  18  bulan sejak  c.  Facility period is a maximum of  18 months 
penandatanganan  perpanjangan  atau  maksimal  from  the  signing  of  the  extension  or  up  to 
sampai dengan Pebruari 2020;  February 2020; 
 
d.  Nisbah  bagi  hasil  akan  ditentukan  kemudian  d.  The  profit  sharing  ratio  will  be  determined 
saat  pencairan  dengan  indikasi  expense  yield  later  when  disbursing  with  an  indication 
Bank saat ini sebesar 9% efektif per tahun.  that  the  current  bank  yield  is  9%  effective 
per year. 
   
 

130
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Selama  masa  pembiayaan  di  BRIS  berlangsung  During  the  financing  period  at  BRIS, 
maka  nasabah  tidak  diperkenankan  melakukan  customers  are  not  permitted  to  carry  out  
tindakantindakan  dibawah  ini  tanpa  persetujuan  the  following  actions  without  written  consent 
tertulis dari BRIS:  from BRIS: 
 
a.  Mengadakan merger dengan Perusahaan lain;  a.  Hold a merger with another company; 
b.  Membayar/melunasi  sebagian  atau  seluruh  b.  Pay/pay  off  part  or  all  of  the  loan 
pinjaman dari pemegang saham;  from the shareholders; 
c.  Mengubah  bentuk  atau  status  badan  hukum  c.  Change  the  form  or  status  of  the  legal 
perseroan,  merubah  anggaran  dasar  entity  of  the  company,  amending  
Perusahaan,  memindahtangankan  penerima  the  Company's  articles  of  association, 
atau  saham  baik  antar  pemegang  saham  transferring  recipients  or  shares  both 
maupun pihak lain;  among shareholders and other parties; 
d.  Mengagunkan,  menyewakan  dan  mengalihkan  d.  Appoint,  lease  and  transfer  assets 
aset yang dijaminkan kepada kreditur atau pihak  guaranteed to creditors or other parties; 
lainnya; 
e.  Melakukan  investasi  baru  pada  bidang  usaha  e.  Make  new  investments  in  business  fields 
yang  tidak  secara  langsung  berkaitan  dengan  that  are  not  directly  related  to  
bisnis inti nasabah;  the customer's core business; 
f.  Menjual  sebagian  atau  seluruh  aset  f.  Sells  part  or  all  of  the  Company's  assets, 
Perusahaan,  diluar  kegiatan  operasional  excluding  the  Company's  operational 
Perusahaan.  activities. 
   
Selama  masa  pembiayaan  di  BRIS  berlangsung  During  the  financing  period  at  BRIS, 
maka  nasabah  wajib  memberikan  pemberitahuan  the  customer  must  provide  written 
secara  tertulis  kepada  BRIS  sebelum  melakukan  notification  to  BRIS  before  taking 
tindakantindakan dibawah ini:  the following actions: 
 
a.  Memperoleh  atau  menambah  pinjaman  a.  Obtain  or add  a loan  from  a bank or  other 
dari Bank atau institusi Keuangan lain  financial institution 
b.  Mengubah susunan pengurus Perusahaan  b.  Change the management of the Company 
c.  Melakukan  investasi  (capital  expenditure)  sama  c.  Make  an  investment  (capital  expenditure) 
dengan  atau  lebih  besar  dari  persentase  aset  equal  to  or  greater  than  percentage  of  
Perusahaan  the Company's assets. 
   
Fasilitas ini dijaminkan dengan:  This loan facility are secured with: 
 
1.  Jumlah  piutang  kepada  Perusahaan  dan/atau  1.  Total bill/receivable to the Company and/or 
tagihan  WBP  selain  kepada  Perusahaan  other  than  the  Company  (with  approval 
(dengan  persetujuan  PT Bank  BRIsyariah  Tbk),  from  PT  Bank  BRIsyariah  Tbk),  as 
sebagai  bouwheer  atas  kontrak-kontrak  customer  based  on  contract  agreement  as 
pekerjaan yang menjadi underlying pencairan di  underlying  for  drawdown  in  PT  Bank 
PT Bank BRIsyariah Tbk.  BRIsyariah Tbk. 
 
2.  Persediaan  berupa  material  yang  dibeli  dengan  2.  Material  inventory  bought  under  financing 
pembiayaan  PT  Bank  BRIsyariah  Tbk  melalui  of  from  PT  Bank  BRIsyariah  Tbk  with  pre-
skema pra proyek pendanaan.  project financing scheme. 
   
Nilai  fidusia  atas  jaminan  berupa  tagihan  dan  Fiduciary  value  with  collateralized  bill  
persediaan  adalah  minimal  125%  dari  plafond  and  inventory  are  minimum  125%  
fasilitas atau Rp 750.000.000.000.  from  the  plafond  or  equivalent  to  
Rp 750,000,000,000. 
   
Pada  tanggal  30  September  2019  dan   As of September 30, 2019 and December 31, 
31  Desember  2018,  saldo  pinjaman  WBP  kepada  2018, the balance of loan of WBP to PT Bank 
PT  Bank  BRIsyariah  masing–masing  sebesar  BRIsyariah amounted to Rp 512,000,000,000, 
Rp 512.000.000.000.  respectively.  
 
 
 
 
 
 
 

131
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
2. PT Bank Mandiri (Persero) Tbk 2. PT Bank Mandiri (Persero) Tbk
   
Berdasarkan  surat  dari  PT  Bank  Mandiri  (Persero)    Based  on  a  letter  from  PT  Bank  Mandiri 
Tbk  Nomor  CBG.LC2/SPPK.009/2018  tanggal   (Persero)  Tbk  CBG.LC2/SPPK.009/2018 
23  Nopember  2018,  telah  disetujui  permohonan  Number  dated  November  23,  2018,  a  new 
fasilitas  kredit  baru  dengan  syarat  dan  ketentuan  credit  facility  application  has  been  approved 
sebagai berikut:  with the following terms and conditions: 
   
  Fasilitas  Receivable  Financing  (RF)  Sublimit  Receivable  Financing  (RF)  Facilities  for 
Non  Cash  Loan  dengan  Limit   Sublimit  Non  Cash  Loans  with  a  Limit  of  
Rp  500.000.000.000,  jangka  waktu  sampai  Rp  500,000,000,000,  the  period  up  to 
dengan 14 Nopember 2019, dengan suku bunga  November  14,  2019,  with  PO  Financing  8% 
PO Financing 8% dan Invoice Financing 7,75%,  interest  and  Invoice  Financing  7.75%, 
Agunannya  adalah  agunan  fixed  aset   Collateral  is  a  fixed  collateral  of  assets  in  
berupa  pabrik  Produksi  beton  precast   the  form  of  a  Production  plant  precast 
di  Bojonegara,  Serang  berupa  tanah  seluas  6,4  concrete in Bojonegara, Serang in the form of 
ha  berikut  bangunan  pabrik  serta  mesin  dan  6.4 ha of land along with factory buildings and 
peralatan  diatasnya.  Disamping  itu  agunan  non  machinery  and  equipment  above.  Besides 
fixed  aset  adalah  piutang  dan  persediaan  yang  that,  non-fixed  collateral  assets  are 
akan  diikat  fiducia  masing-masing  sebesar   receivables and inventories that will be bound 
Rp 17.000.000.000 dan Rp 255.000.000.000. by  fiducia  are  Rp  17,000,000,000  and  
Rp 255,000,000,000, respectively
   
  Fasilitas No Cash Loan (Bank Garansi) Sublimit  Facility  of  No  Cash  Loan  (Bank  Guarantee) 
dari  Fasilitas Receivable Financing dengan limit  Sublimit  from  Receivable  Financing  Facility 
Rp  100.000.000.000,  jangka  waktu  sampai  with a limit of Rp 100,000,000,000, the period 
dengan  14  Nopember  2019,  agunan  dikaitkan  up  to  November  14,  2019,  collateral  is 
dengan agunan fasilitas Receivable Financing. associated  with  collateral  for  Receivable 
Financing facilities.

Pada  tanggal  30  September  2019  dan   As of September 30, 2019 and December 31, 


31  Desember  2018,  saldo  pinjaman  WBP  kepada  2018,  the  balance  of  loan  of  WBP  to  
PT  Bank  Mandiri  (Persero)  Tbk  masing  -  masing  PT  Bank  Mandiri  (Persero)  Tbk  amounted  to 
sebesar Rp 435.863.758.291 dan Nihil.  Rp 435,863,758,291 and Nil, respectively.                             

3. PT Bank Tabungan Negara (Persero) Tbk 3. PT Bank Tabungan Negara (Persero) Tbk
   
Berdasarkan Akta Perjanjian Kerjasama No. 53, 57  Based on the Deed of Cooperation Agreement 
dan  61  tanggal  25  Mei  2018  dengan  PT  Bank  No.  53,  57  and  61  dated  May  25,  2018  with         
Tabungan  Negara  (Persero)  Tbk,  WBP  PT  Bank  Tabungan  Negara  (Persero)  Tbk, 
memperoleh fasilitas kredit dari PT Bank Tabungan  WBP  obtained  a  credit  facility  from  PT  Bank 
Negara  (Persero)  Tbk  berupa  kredit  modal  kerja  Tabungan Negara (Persero) Tbk in the form of 
kontraktor,  yang  masing-masing  peruntukannya  contractor  working  capital  credit,  each  of 
adalah  sebagai  modal  kerja  pengadaan  material  which  is used as  working  capital  procurement 
precast dan readymix proyek Tol Cinere – Serpong  of  precast  and  readymix  materials  for  
sebesar Rp 200.000.000.000, dengan jangka waktu  the  Cinere  -  Serpong  Toll  Road  project 
pinjaman  selama  8  bulan,  SKBDN  untuk   amounted to  Rp 200,000,000,000, with a loan 
pembelian  bahan  baku/perlengkapan  sebesar   period  of  8  months,  SKBDN  for  the  purchase  
Rp  100.000.000.000  dengan  jangka  waktu  sampai  of  raw  materials/equipment  amounted  to  
dengan  tanggal  27  April  2019,  dan  sebagai  modal  Rp  100,000,000,000  with  a  period  of  up  to 
kerja  pengadaan  material  precast  dan  readymix  April  27,  2019,  and  as  working  capital  for 
proyek  Tol  Cibitung  –  Cilincing  sebesar   procurement  of  precast  and  readymix 
Rp  400.000.000.000,  dengan  jangka  waktu  materials for Cibitung - Cilincing Toll Project of 
pinjaman sampai dengan 21 Nopember 2019.  Rp  400,000,000,000,  with  a  loan  period of  up 
to November 21, 2019. 
   
Masing-masing  fasilitas  ini  dijaminkan  dengan  This  loan  facility  is  secured  with  Cassie  on 
cassie  atas  tagihan  termin/pembayaran  account  receivables  from  SPPM  
berdasarkan  SPPM  No.  10/SPPM/WK/DVII/2017  No. 10/SPPM/WK/DVII/2017 dated September 
tanggal  28  September  2017,  cassie  atas  28, 2017, cassie on aacount receivables from 
tagihan/termijn/pembayaran  berdasarkan  SPM   SPM  No.  09/SPPM/WK/DVI/2017  dated 
No. 09/SPPM/WK/DVII/2017 tanggal 25 September  September 25, 2017. 
2017. 
   
 
 

132
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pembatasan:  Negative covenants: 
1.  Memperoleh  fasilitas  kredit  dari  pihak  lain  1.  Obtained  a  credit  facility  from  others 
sehubungan  dengan  proyek  tersebut  kecuali  related  to  the  project  except  the  credit 
pinjaman  dari  pemegang  saham  dan  transaksi  facility from the shareholders and  common 
yang lazim;  transactions; 
2.  Mengikat  diri  sebagai  penjamin  dan  atau  2.  Binds  itself  as  surety  and/  or  pledging  
menjamin harta;  the Company’s assets; 
3.  Melakukan merger dan akuisisi;  3.  Hold a merger and acquisition; 
4.  Melunasi hutang kepada pemegang saham;  4.  Pay of the loan from the shareholders; 
5.  Membubarkan  Perusahaan  atau  meminta  5.  Liquidation  of  corporate  or  propose  file 
dinyatakan pailit;  bankruptcy; 
6.  Memindahtangankan  dalam  bentuk  apapun  6.  Transferring in any the form to a third party; 
kepada pihak ketiga.  7.  The  Company  must  provide  written 
7.  Memberitahu  secara  tertulis  kepada  Bank  notification  to  the  Bank  regarding  
mengenai  maksudnya  untuk  mengeluarkan  the issuance of the new shares and selling 
saham  baru  dan  menjual  saham-saham  yang  the existing shares. 
telah ada. 
   
Pada  tanggal  30  September  2019  dan   As of September 30, 2019 and December 31, 
31  Desember  2018,  saldo  pinjaman  WBP  kepada  2018, the balance of loan of WBP to PT Bank 
PT  Bank  Tabungan  Negara  (Persero)   Tabungan Negara (Persero) Tbk amounted to 
Tbk  masing-masing  sebesar  Rp 400.000.000.000  Rp 400,000,000,000 and Rp 600,000,000,000, 
dan  Rp 600.000.000.000.  respectively.  
   
4. PT Bank Rakyat Indonesia (Persero) Tbk. 4. PT Bank Rakyat Indonesia (Persero) Tbk.  
   
Berdasarkan  surat  No.  R-II-127-ADK/DKR-2/5/2016  According to the letter No. R-II-127-ADK/DKR-
tanggal  30  Mei  2016,  WBP  memperoleh  fasilitas  2/5/2016  dated  May  30,  2016,  WBP  entered 
kredit  dari  BRI  berupa  KMKK  sebesar  into the credit facilities from BRI in the form of 
Rp  1.000.000.000.000,  dengan  jangka  waktu  KMKK Rp 1,000,000,000,000 the term of  loan 
pinjaman  selama  12  bulan  sejak  tanggal  30  Mei  is  for  12  months  since  May  30,  2016  and  will 
2016  dan  jatuh  tempo  29  Mei  2017,  berdasarkan  be  due  on  May  29,  2017,  based  on  loan 
perjanjian  kredit  No.  116  tanggal  30 Mei  2016  agreement  No.  116  dated  May  30,  2016  with 
dengan  suku  bunga  10%  per  tahun.  Perjanjian  ini  an interest rate of 10% per annum (p.a.). This 
telah  diperpanjang  berdasarkan  surat  persetujuan  facility  has  recently  been  extended  based  on 
perpanjangan fasilitas kredit No. R.II.120-ADK/DKR- loan  extension  approval  letter  No.  R.II.120-
2/06/2017  tanggal  12  Juni  2017,  dengan  jangka  ADK/DKR-2/06/2017  dated  June  12,  2017, 
waktu  12  bulan  sampai  dengan  tanggal  with  a  term  of  12  months  until  May  30,  2018.             
30  Mei  2018.  Fasilitas  ini  telah  diperpanjang  lagi  This facility has recently been extended again 
berdasarkan  surat  persetujuan  perpanjangan  based  on  loan  extension  approval  letter  
fasilitas  kredit  No.  R.II.149-OPK/DKD/06/2019  No.  R.II.149-OPK/DKD/06/2019  dated  June 
tanggal  11  Juni  2019,  dengan  jangka  waktu  11,  2019,  with  a  term  of  12  months  until  May 
12  bulan  sampai  dengan  tanggal  30  Mei  2020,  30,  2020,  with  an  interest  rate  of  9.50%  per 
dengan suku bunga 9,50% per tahun.  annum. 
 
Fasilitas pinjaman ini dijamin dan diikat dengan:  The  loan  facility  is collateralized  and  bounded 
with: 
   
a.  Tagihan  atas  Proyek  Tol  Solo  Kertosono  a.  Amount  due  from  customer  of  Solo 
yang  akan  diikat  dengan  cessie  sebesar  Kertosono  Toll  Road  Project  with  cessie 
Rp 690.669.000.000.  amounted to Rp 690,669,000,000. 
   
b.  Tagihan  atas  Proyek  Light  Rapid  Transit  b.  Amount  due  from  customer  of  Light  Rapid 
yang  akan  diikat  dengan  cessie  sebesar  Transit  Project  with  cessie  amounted  to 
Rp 301.209.000.000.  Rp 301,209,000,000. 
   
c.  Tagihan  atas  Proyek  Pengamanan  Pantai  yang  c.  Amount  due  from  customer  of  Pengaman 
akan  diikat  dengan  cessie  sebesar  Pantai  Project  with  cessie  amounted  to 
Rp 108.578.000.000.  Rp 108,578,000,000. 
   
d.  Tagihan  atas  Proyek  Tol  Manado  Bitung  d.  Amount  due  from  customer  of  Manado 
yang  akan  diikat  dengan  cessie  sebesar  Bitung  Toll  Road  Project  with  cessie 
Rp 122.352.000.000.  amounted to Rp 122,352,000,000. 
   

133
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
e.  Tagihan  atas  Pejagan  Pemalang  Tol  Road  e.  Amount  due  from  customer  of  Pejagan 
yang  akan  diikat  dengan  cessie  sebesar  Pemalang  Toll  Road  project  with  cessie 
Rp 180.442.000.00.  amounted to Rp 180,442,000,000. 
   
f.  Tagihan  atas  proyek  Pemalang  Batang  f.  Amount  due  from  customer  of  Pemalang 
yang  akan  diikat  dengan  cessie  sebesar  Batang  Toll  Road  project  with  cessie 
Rp 481.162.000.00.  amounted to Rp 481,162,000,000. 
   
g.  Proyek-proyek  WBP  yang  akan  dibiayai  oleh  g.  The  projects  of  WBP  that  will  funded  by  
Bank minimal mencover 120%.  the Bank, should covered at least 120%. 
   
h.  Tanah  di  Desa  Gasing,  Kecamatan  Talang  h.  Land  located  in  Gasing  Village,  Talang 
Kelapa,  Banyuasin,  Sumatera  Selatan,  yang  Kelapa  District,  Banyuasin,  South 
telah  diikat  Hak  Tanggungan  dengan  Sumatera,  has  been  tied  by  Mortagage 
No.  1249/2017  senilai  Rp  41.651.000.000  Right  No.  1249/2017  amounted  to 
atas  sertifikat  Hak  Guna  Bangunan  Rp 41,651,000,000 with Building Use Right 
No.  324/Gasing,  326/Gasing,  327/Gasing,  No.  324/Gasing,  326/Gasing,  327/Gasing, 
328/Gasing,  329/Gasing,  331/Gasing,  328/Gasing,  329/Gasing,  331/Gasing, 
342/Gasing,  343/Gasng,  334/Gasing,  dan  342/Gasing,  343/Gasng,  334/Gasing,  and 
325/Gasing (Catatan 16).  325/Gasing (Notes 16). 
   
Pembatasan terhadap tindakan:  Restriction of covenant: 
   
1.  Mengikatkan  diri  sebagai  penjamin  terhadap  1.  Binds  itself  as  a  collateral  against  
pihak  lain  dan/atau  menjaminkan  kekayaan  the  other  party  and/or  pledging  Debtor 
debitur  kepada  pihak  lain,  kecuali  yang  sudah  wealth  to  other  parties,  except  those 
ada saat ini.  already existing. 
 
2.  Mengajukan  permohonan  pernyataan  pailit  2.  Filing  for  bankruptcy  declaration  to 
kepada  Pengadilan  Niaga  untuk  menyatakan  the  Commercial  Court  to  declare  itself 
pailit debitur sendiri.  insolvent debtor. 
   
3.  Menyewakan  aset  yang  dijaminkan  di  bank  3.  Lease  the  tangible  assets  in  banks  or 
atau lembaga keuangan lainnya.  other financial institutions. 
   
4.  Melunasi/membayar  utang  kepada  pemegang  4.  Repay  the  debt  to  shareholders/limited 
saham/utang  persero  sebelum  utang  di  bank  company's  debt  before  the  bank  repays 
dilunasi terlebih dahulu.  the debt in advance. 
   
5.  Melakukan tindakan merger, akuisisi, go public  5.  Perform  mergers,  acquisitions,  go  public 
dan penjualan aset Perusahaan;  and sell the Company’s assets; 
   
6.  Menerima Pinjaman/pembiayaan baru dari BRI  6.  Receive  new  loans/financing  from  BRI  or 
atau lembaga keuangan lainnya.  other financial institutions. 
   
Pada  tanggal  30  September  2019  dan   As of September 30, 2019 and December 31, 
31  Desember  2018  saldo  pinjaman  WBP  kepada  2018  the  balance  of  loan  of WBP  to  PT Bank 
PT  Bank  Rakyat  Indonesia  (Persero)  Tbk   Rakyat  Indonesia  (Persero)  Tbk  amounted  to 
masing-masing  sebesar  Rp 379.099.999.998  dan  Rp 379,099,999,998 and Rp 670,359,467,938, 
Rp 670.359.467.938.  respectively. 
   
5. PT Bank Negara Indonesia (Persero) Tbk 5. PT Bank Negara Indonesia (Persero) Tbk
     
Berdasarkan  surat  No.  BIN/2.2/094/R  tanggal  According  to  letter  No.  BIN/2.2/094/R  dated 
10 Juni  2015,  Perusahaan  memperoleh  fasilitas  June  10,  2015,  the  Company  entered  into  
kredit dari PT Bank Negara Indonesia (Persero) Tbk  the  credit  facilities  from  PT  Bank  Negara 
sebagai berikut:  Indonesia (Persero) Tbk as follows: 
   
  Kredit modal kerja revolving Rp 50.000.000.000,    Revolving working capital loan amounted to 
jangka  waktu  pinjaman  selama  12  bulan  sejak  Rp 50,000,000,000, the term of loan for 12 
tanggal  23  Juni  2015  dan  jatuh  tempo  23  Juni  months  since  June  23,  2015  and  will  be 
2016. Kredit modal kerja revolving tersebut telah  due  on  June  23,  2016.  Revolving  working 
diaktanotariskan  berdasarkan  perjanjian  kredit  capital  loan  has  been  annotated  based  on 
No.  150  tanggal  22  Juni  2018.  Fasilitas  telah  loan  agreement  No.  150  dated  June  

134
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
diperpanjang  berdasarkan  Persetujuan  22,  2018.  The  facility  has  been  extended 
perpanjangan  fasilitas  kredit  No.  BIN/2.2/146/R  based  on  the  letter  of  approval  
sampai dengan tanggal 22 Juni 2020.  for  extension  of  credit  facility  
No. BIN/2.2/146/R up to June 22, 2020. 
   
  Kredit  modal  transaksional  Rp  300.000.000.000,    Transactional  working  capital  loan 
jangka  waktu  pinjaman  selama  12  bulan  sejak  amounted to Rp 300,000,000,000, the term 
tanggal  23  Juni  2015  dan  jatuh  tempo  23  Juni  of  loan for 12 months since June 23, 2015 
2016.  Kredit  modal  transaksional  tersebut  telah  and  will  be  due  on  June  23,  2016. 
diaktanotariskan  berdasarkan  perjanjian  kredit  Transactional  working  capital  loan  has 
No.  151  tanggal  22  Juni  2018.  Fasilitas  telah  been  annotated  based  on  loan  agreement 
diperpanjang  berdasarkan  Persetujuan  No.  151  dated  June  22,  2018.  The  facility 
perpanjangan  fasilitas  kredit  No.  BIN/2.2/146/R  has  been  extended  based  on  the  letter  of 
sampai dengan tanggal 22 Juni 2020.  approval  for  extension  of  credit  facility  
No. BIN/2.2/146/R up to June 22, 2020. 
   
  Kredit  modal  kerja  supply  chain  financing  (SCF),    Working  capital  supply  chain  financing 
bank garansi dan letter of credit (L/C) atau SKBDN  (SCF),  bank  guarantee  and  letter  of  credit 
Rp 300.000.000.000,  jangka  waktu  pinjaman  (L/C)  or  SKBDN,  working  capital  loan  of      
selama  12  bulan  sejak  tanggal  23  Juni  2015  dan  Rp  300,000,000,000,  the  term  of  loan  for 
jatuh tempo 23 Juni 2016. Kredit modal kerja SCF  12 months since date of June 23, 2015 and 
tersebut  telah  diaktanotariskan  berdasarkan  will  be  due  on  June  23,  2016.  SCF  has 
perjanjian  kredit  No.  152  tanggal  22  Juni  2018.  been  annotated  based  on  loan  agreement 
Fasilitas  telah  diperpanjang  berdasarkan  No. 152  dated  June  22,  2018.  The  facility 
Persetujuan  perpanjangan  fasilitas  kredit   has  been  extended  based  on  the  letter  of 
No.  BIN/2.2/146/R  sampai  dengan  tanggal   approval  for  extension  of  credit  facility  
22 Juni 2020.  No. BIN/2.2/146/R up to June 22, 2020. 
   
Fasilitas pinjaman ini dijamin dan diikat dengan:  The  loan  facilities  are  collateralized  and 
bounded with: 
   
  Satu  bidang  tanah  dan  bangunan     A  plot  of  land  and  a building, with  an  area 
seluas  40.196  m2,  terletak  di  Desa   of  40,196  sqm,  located  at  Desa 
Kedungwonokerto,  Kecamatan  Prambon,  Kedungwonokerto,  Kecamatan  Prambon, 
Kabupaten  Sidoarjo,  Jawa  Timur,  atas   Kabupaten  Sidoarjo,  West  Java  under     
nama  WBP  senilai  Rp 66.038.444.437   the  name  of  WBP  amounted  to 
sesuai  dengan  Laporan  Konsultan  KJPP   Rp 66,038,444,437  according  to  
Piesta  No. 074/SF/FS.PDC.KSI/II/2015  tanggal  Consultant  KJPP  Piesta  Report 
24 Pebruari  2015  (Catatan  16)  akan  diikat  Hak  No. 074/SF/FS.PDC.KSI/II/2015  dated 
Tanggungan (HT).  February 24, 2015 (Note 16) will be tied by 
Guarantee Right. 
   
  Satu  bidang  tanah  dan  bangunan  dengan    A plot of  land and a building with land use 
Sertifikat  hak  guna  bangunan  (SHGB)  No.  38  rights  (SHGB)  No.  38  dated  January  22, 
berlaku sejak tanggal 22 Januari 2015 dan akan  2015  and  the  right  will  expired  on  January 
berakhir pada  tanggal  16  Januari  2045,  dengan  16,  2045,  an  area  of  70,099  sqm,  located 
luas  70.099  m2,  terletak  di  Desa  Cibatu,  at  Desa  Cibatu,  Kecamatan  Cibatu, 
Kecamatan  Cibatu,  Kabupaten  Purwakarta,  Kabupaten  Purwakarta,  West  Java,  under 
Jawa Barat, atas nama WBP (dahulu atas nama  the  name  of  WBP  (formerly  under  
Perusahaan)  senilai  Rp  88.340.004.000  the  name  of  the  Company)  amounted  to 
(Catatan  16)  sudah  diikat  Hak  Tanggungan  Rp 88,340,004,000 (Note 16) has been tied 
(HT).  by Guarantee Right. 
   
  Satu bidang tanah dan bangunan dengan SHGB    A plot of  land and a building with land use 
No.  02/Kalijaya  berlaku  sejak  tanggal  rights  (SHGB)  No.  02/Kalijaya  dated 
16 Pebruari  1988  dan  akan  berakhir  pada  February 16, 1988 and the right will expired 
tanggal  16 Pebruari  2018,  dengan  luas  on  February  16,  2018,  an  area  of  16,620 
16.620m2,  terletak  di  Jl.  Imam  Bonjol  No. 52,  sqm,  located  at  Jl.  Imam  Bonjol  No. 52, 
Desa Kalijaya, Kecamatan Cikarang, Kabupaten  Desa  Kalijaya,  Kecamatan  Cikarang, 
Bekasi,  Jawa  Barat,  atas  nama  Perusahaan  Kabupaten  Bekasi,  West  Java,  under  
senilai  Rp  58.218.498.201  (Catatan  16)  sudah  the  name  of  the  Company  amounted  to  
diikat Hak Tanggungan (HT).  Rp 58,218,498,201 (Note 16) has been tied 
by Guarantee Right. 
 
  Peralatan/mesin/alat berat di Wilayah Karawang,    Equipment/machine/heavy  equipment  at 
Desa  Klari,  Kabupaten  Karawang,  Jawa  Barat,  Karawang  Plant,  Desa  Klari,  Kabupaten 

135
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
sebesar  Rp  299.866.478.836  sesuai  Laporan  Karawang,  West  Java  amounted  to 
Konsultan  KJPP  Piesta  No. 074/SF/FS.  Rp 299,866,478,836  according  to 
PDC.KSI/II/2015  tanggal  24 Pebruari  2015  Consultant  KJPP  Piesta  Report 
(Catatan 16) yang akan diikat secara fidusia.  No. 074/SF/FS.PDC.KSI/II/2015  dated 
February 24, 2015 (Note 16) will be tied by 
fiduciary. 
 
  Satu  bidang  tanah  dan  bangunan  seluas    A  plot  of  land  and  building,  covering  an 
130.296 m2, terletak di Desa Curug, Kecamatan  area  of  130,296  sqm,  located  at  Curug 
Klari,  Kabupaten  Karawang,  Jawa  Barat,  atas  Village,  Klari  District,  Karawang  
nama  Perusahaan  senilai  Rp  137.721.233.566  Regency,  West  Jawa  under  the  name  
sesuai  dengan  Laporan  Konsultan  KJPP   of  the  Company  amounted    to  
Piesta  No. 074/SF/FS.PDC.KSI/II/2015  tanggal  Rp  137,721,233,566  according  to 
24 Pebruari 2015 (Catatan 14) sudah diikat HT.  Consultant  KJPP  Piesta  Report 
No. 074/SF/FS.PDC.KSI/II/2015  dated 
February 24, 2015 (Note 14) has been tied 
by Mortgage Right. 
   
  Peralatan/mesin/alat  berat  di  Wilayah  Sidoarjo,    Equipment/machine/heavy  equipment  at 
Desa  Kedungwonokerto,  Jawa  Timur,  sebesar  Sidoarjo  Plant,  Desa  Kedungwonokerto, 
Rp  175.490.704.294  sesuai  Laporan  Konsultan  East  Java  amounted  to 
KJPP  Piesta  No. 074/SF/FS.PDC.  KSI/II/2015  Rp 175,490,704,294  according  to 
tanggal  24 Pebruari  2015  yang  akan  diikat  Consultan  KJPP  Piesta  Report 
secara fidusia.  No. 074/SF/FS.PDC.KSI/II/2015  dated 
February 24, 2015 will be tied by fiduciary. 
   
  Piutang  usaha  WBP  pada  tanggal     Trade  accounts  receivable  of  WBP  as  of 
31  Desember  2017  sebesar   December  31,  2017  amounted  to 
Rp  240.461.410.753  yang  akan  diikat  secara  Rp 240,461,410,753  will  be  tied  by 
fidusia.  fiduciary. 
   
Pembatasan terhadap tindakan:  Restriction of covenant: 
   
1.  Melakukan  perubahan  kegiatan  usaha  1.  Changing  business  activities  as  stated  in 
sebagaimana  tercantum  dalam  anggaran  dasar  the  article  of  association  that  can  reduce 
yang  dapat  mengurangi  kemampuan  melunasi  the ability to pay off the credit facility. 
fasilitas kredit. 
 
2.  Menjual  atau  memindahkan  hak  atau  2.  Sell  or  transfer  all  or  a  part  of  assets  of           
mengalihkan  seluruh  atau  sebagian  kekayaan/  the  Company  in  a  single  transaction  or  in 
aset dalam satu transaksi atau dalam beberapa  multiple transactions, except: 
transaksi kecuali: 
  Menjual  atau  mengalihkan  aset  dengan      Selling  or  transferring  assets  with  
ketentuan  yang  bersifat  arm’s  length  dan  the  provisions  that  are  arm’s  length  for 
dalam  rangka  menjalankan  usaha  sehari- the  purpose  to  perform  daily  business 
hari.  activities. 
  Menjual  atau  dengan  cara  lain  mengalihkan      Selling  or  transferring  assets  as  a 
aset  sebagai  ganti  atau  digantikan  aset  replace  or  to  be  replaced  with  another 
lainnya  yang  sebanding  atau lebih  baik  tipe,  comparable  assets  or  better  in  type, 
sifat dan kualitasnya.  nature, and quality. 
  Menjual  atau  mengalihkan  aset  dalam      Selling  or  transferring  assets  for              
rangka  pelaksanaan  reorgarnisasi  oleh  the  purpose  of  government 
Pemerintah  Republik  Indonesia  sepanjang  reorganization  of  the  Republic  of 
penjualan  aset  tersebut  tidak  mempunyai  Indonesia as long as the sale of assets 
akibat material.  did not have a material result 
  Menjual  atau  mengalihkan  aset  yang  sudah      Selling  or  transferring  assets  that  are 
tidak berguna atau tidak dipakai lagi dengan  not useful or are not used anymore with 
ketentuan yang bersifat arm’s length.  the requirements of arm’s length. 
     
3.  Mengubah  usaha  yang  sekarang  dijalankan/  3.  Changing  the  operation  of  a  current 
diusahakan  yang  dapat  menimbulkan  akibat  business  that  may  cause  material  results 
material,  kecuali  dipersyaratkan  oleh  unless required by applicable law. 
perundang-undangan yang berlaku. 
 
 
 

136
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
4.  Melakukan  peleburan,  penggabungan,  4.  Merging, combining, separation,  liquidation 
pemisahan,  pembubaran  perseroan  maupun  or  reconstruction  of  the  Company  except  
rekonstruksi (tindakan korporasi), kecuali:  the following requirements: 
  Reorganisasi  yang  dapat  dilakukan  oleh      Reorganization  can  be  done  by              
Pemerintah  Republik  Indonesia  sepanjang  the  Government  of  the  Republic  of 
tidak memiliki akibat material.  Indonesia as long as it does not have a 
material result. 
  Tindakan  korporasi  dengan  anggota  lain    The  corporate  actions  with  other 
dalam  grup  dengan  ketetentuan  bahwa  members  in  the  group  with  
tindakan korporasi tersebut dilakukan.  the  provision  following  the 
requirements. 
  Tindakan korporasi yang dipersyaratkan oleh    Corporate  actions  required  by 
peraturan  perundang-undangan  yang  applicable laws and regulations. 
berlaku. 
  Pemisahan  dimana  Perusahaan  menjadi    Separation  which  the  Company 
pemegang saham mayoritas.  becomes the major shareholder. 
   
5.  Melakukan  perubahan  anggaran  dasar  yang  5.  Changes  of  association  that  can  lead  to  a 
dapat menimbulkan akibat material.  material result. 
 
6.  Mengajukan  permohonan  pailit  atau  6.  Proposing  a  file  of  bankruptcy  or 
permohonan penundaan kewajiban pembayaran  postponement  of  debt  payment  to 
utang kepada instansi yang berwenang.  authorized parties. 
     
7.  Memperoleh  pinjaman  dari  bank  atau  lembaga  7.  Obtaining  loans  from  other  banks  or 
keuangan lain.  financial institutions. 
   
Berdasarkan surat  dari  PT  Bank  Negara  Indonesia  Based on the letter from the PT Bank Negara 
(Persero)  Tbk  tanggal  7  Juni  2016  Indonesia  (Persero)  Tbk  dated  June  7,  2016  
No. BIN/2.2/391/R,  PT  Bank  Negara  Indonesia  No.  BIN/2.2/391/R,  PT  Bank  Negara 
(Persero)  Tbk  memberikan  persetujuan  (waiver)  Indonesia  (Persero)  Tbk  stated  a  waiver 
atas  pembatasan  melakukan  perubahan  anggaran  concerning  the  restriction  on  making 
dasar  yang  dapat  menimbulkan  akibat  material  amendments to the articles of association that 
terkait  rencana  WBP  untuk  melakukan  proses  can  lead  to  material  result  in  relation  to  
penawaran umum perdana saham.  the  WBP’s  plan  to  conduct  an  initial  public 
offering of shares. 
   
Pada  tanggal  30  September  2019  dan   As of September 30, 2019 and December 31, 
31  Desember  2018  saldo  pinjaman  WBP  kepada  2018 the balance of loan of WBP to PT Bank 
PT  Bank  Negara  Indonesia  (Persero)  Tbk   Negara  Indonesia  (Persero)  Tbk  amounted  to 
masing-masing  sebesar  Rp 50.000.000.000  dan  Rp 50,000,000,000  and  Rp 350,000,000,019, 
Rp 350.000.000.019.  respectively.                                
   
6. PT Bank DKI 6. PT Bank DKI
   
Berdasarkan Perjanjian Kredit Modal Kerja Sublimit    Based  on  Aggreement  of  Working  Capital 
Fasilitas  Non  Cash  Loan  No.  30  tanggal  15  Juni  Credit, with sublimit of the facility of Non Cash 
2017.  Perjanjian  ini  telah  diperpanjang  dengan  Loan No. 30 dated  June 15, 2017. This facility 
Surat  Pemberitahuan  Persetujuan  Kredit  (SPPK)  has  recently  been  extended  based  on  loan 
No.  0910/GKK/V/2018  tanggal  25  Mei  2018,  extention  approval  No.  0910/GKK/V/2018 
dengan  jangka  waktu  dua  belas  (12)  bulan   dated May 25, 2018, with a term of 12 months 
sampai  dengan  16  Juni  2019.  Perjanjian  ini   until June 16, 2019. This agreement has been 
telah  diperpanjang  berdasarkan  Perjanjian  extended  based  on  the  Supply  Chain 
Pemberian  Fasilitas  Supply  Chain  Financing   Financing  Facility  Granting  Agreement  
No.  04/PKS/DIR/VIII/2019  sampai  dengan  15  Juni  No. 04/PKS/DIR/VIII/2019 until June 15, 2020. 
2020.  Perusahaan  memperoleh  fasilitas  kredit  The  Company  obtained  working  capital  loan 
modal Kerja dari PT Bank DKI sebagai berikut:  from PT  Bank DKI as follows: 
 
1.  Kredit  modal  kerja  pinjaman  berjangka  sebesar    1.  Working  capital  loan  amounting  to  
Rp  200.000.000.000,  dengan  jangka  waktu  Rp  200,000,000,000,  with  a  term  of  12 
selama  12  bulan  sampai dengan  tanggal  6 Juni  months  until  June  6,  2018  and  with  an 
2018 dan dengan suku bunga 9,25% per tahun.  interest rate of 9.25% per annum. 
   
2.  Kredit  modal  kerja  konstruksi  sebesar    2.  Working  capital  loan  construction  of  
Rp  100.000.000.000  untuk  pengadaan  bahan  Rp  100,000,000,000  for  precast  and 
precast dan readymix proyek Jalan Tol Jakarta –  readymix  material  procurement  for  Jakarta 

137
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Cikampek  II  Elevated,  dengan  jangka  waktu  –  Cikampek  II  Elevated  Highways  project, 
selama  12  bulan  sejak  15  Juni  2018  sampai  with  the  term  of  12  months  from  June  15, 
dengan 15 Juni 2019.  2018 until June 15, 2019. 
   
3.  Kredit  modal  kerja  pinjaman  tetap  berjangka    3.  Working  capital  sublimit  non  cash  loan 
sublimit  non  cash  loan  sebesar   amounted  to  Rp  600,000,000,000  with  
Rp  600.000.000.000,  dengan  jangka  waktu  the term of 12 months from June 15, 2018 
selama  12  bulan  sejak  15  Juni  2018  sampai  until June 15, 2019. 
dengan 15 Juni 2019. 
 
Fasilitas pinjaman ini dijamin dengan:  These loan facilities are collateralized by: 
   
1.  Piutang  usaha  Perusahaan  yang  diikat  secara  1.  Trade accounts receivable of the Company 
fidusia, sebesar minimal Rp 750.000.000.000.  bound  under  fiduciary,  amounting  to  
Rp 750,000,000,000. 
   
2.  Piutang  usaha  atas  proyek  senilai  kontrak  yang  2.  Trade  accounts  receivable  amounting  to 
dibiayai PT Bank DKI.  the  contract  value  of  the  project  financed 
by PT Bank DKI. 
   
Kredit  modal  kerja  pinjaman  berjangka  ini  telah    This  working  capital  loan  is  fully  repaid  in 
dilunasi  pada  bulan  Desember  2017,  namun  dapat  December 2017, however can be withdrawn.  
ditarik kembali. 
     
Pembatasan:  Negative Covenant: 
   
1.  Melakukan  Adendum  Kontrak  pengadaan    1.  Conduct  Addendum  Contract  for  
material  precast  dan  readymix  dalam  the  procurement  of  precast  and  readymix 
pembangunan  Jalan  Tol  Jakarta  –  Cikampek  II  materials in the construction of the Jakarta 
Elevated.  - Cikampek II Elevated Toll Road. 
   
2.  Mengalihkan  hak  atas  agunan  yang  sudah    2.  Transferring  the  right  to  collateral  that  has 
dijaminkan ke Bank DKI kepada pihak lain.  been pledged to Bank DKI to another party 
 
3.  Mengikatkan  diri  sebagai  penjamin  hutang  atau    3.  Binding themselves as guarantor of debt or 
menjaminkan  harta  kekayaan  Perseroan  yang  pledging  the  Company's  assets  that  have 
sudah  dijaminkan  ke  Bank  DKI  kepada  pihak  been pledged to Bank DKI to other parties 
lain. 
     
4.  Mengalihkan/menyerahkan  kepada  pihak  lain,    4.  Transferring / surrendering to other parties, 
sebagian  atau  seluruhnya  atas  hak  dan  in part or in whole for rights and obligations 
kewajiban yang timbul berkaitan dengan fasilitas  arising  in  connection  with  Debtor  credit 
kredit Debitur di Bank DKI.  facilities at Bank DKI. 
   
Pada  tanggal  30  September  2019  dan   As of September 30, 2019 and December 31, 
31  Desember  2018  saldo  pinjaman  WBP  2018 the balance of loan of WBP to PT Bank 
kepada  PT  Bank  DKI  masing-masing  sebesar   DKI  amounted  to  Rp  580,000,000,000  and  
Rp 580.000.000.000 dan Rp 644.200.000.000.  Rp 644,200,000,000, respectively. 
   
7. Bank of Tokyo Mitsubishi UFJ, Ltd 7. Bank of Tokyo Mitsubishi UFJ, Ltd
   
Berdasarkan  surat  No.0187/CF/CDU-NJ/RAD/18  According  to  Letter  No.  0187/CF/CDU-
tanggal  26  Juli  2018,  Perusahaan  memperoleh  NJ/RAD/18  dated  July  26,  2018,  the  Company 
fasilitas  kredit  berupa  kredit  modal  kerja  sebesar  obtained  the  credit  facilities  in  the  form  of 
Rp 500.000.000.000  atau  jumlah  yang  setara  dalam  working  capital  credit  amounted  to 
mata  uang  Dolar  Amerika  Serikat,  dengan  sublimit  Rp  500,000,000,000  or  its  equivalent  in  United 
untuk  Fasilitas  Impor/Lokal  LC  (Sight/Usance)  Stated  Dollars  Currency,  with  sublimit  for 
dibatasai  sampai  dengan  Rp 150.000.000.000,  Import/Local  LC  (Sight/Usance)  Facility  is 
dengan  jangka  waktu  12  bulan  sejak  tanggal  26  Juli  limited up to Rp 150,000,000,000, the loan term 
2018  sampai  26  Juli  2019  dengan  suku  bunga  ICE  for  12  month  since  date  of  July  26,  2018  until 
LIBOR untuk jangka waktu bunga yang bersangkutan  July 26,  2019  with  the  interest  rate  of  ICE 
ditambah dengan marjin yang berlaku untuk pinjaman  LIBOR  for  Relevant  Interest  Period  plus 
dalam Dolar Amerika Serikat dan JIBOR untuk jangka  applicable  margin  for  loan  in  USD  and  JIBOR 
waktu  bunga  yang  bersangkutan  ditambah  dengan  for  Relevant  Interest  Period  plus  Applicable 
marjin  yang  berlaku  untuk  pinjaman  dalam  Rupiah.  Margin  for  Loan  in  IDR.  Applicable  margin  in 
Marjin yang berlaku baik untuk USD maupun Rupiah  USD or IDR is amounted to 2.50% per annum. 
sebesar 2,50% per tahun. 

138
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pembatasan terhadap tindakan:  Restriction of covenant: 
   
1.  Menjual,  menyewakan,  memindahkan  atau  1.  Sale,  Lease,  Transfer  or  other  means 
dengan cara lain melepaskan atau memberikan  dispose  of,  or  grant  any  security  interest 
kepentingan  jaminan  apapun  atas,  salah  satu  over, any of the Borrower’s assets, except 
dari  aset-aset  debitur,  kecuali  dalam  in its ordinary course of business. 
menjalankan kegiatan usahanya sehari-hari. 
   
2.  Memperoleh  setiap  aset  dengan  cara  membeli  2.  Acquire  by  purchase  or  by  other  means 
atau dengan cara lainnya, kecuali dalam rangka  any assets, exept in its ordinary  course of 
menjalankan  kegiatan  usaha  sehari-hari  yang  business  in  compliance  with  the  Article  of 
sesuai dengan anggaran dasar Debitur.  Association of the Borrower. 
   
3.  Bertindak  sebagai  penjamin  atau  melakukan  3.  Act  as  a  guarantor  or  perform  any  acts 
tindakan apapun yang memiliki dampak sejenis  with similar effect, against any third party’s 
sehubungan dengan kewajiban-kewajiban pihak  obligations. 
ketiga manapun. 
   
Ketentuan  pinjaman  berdasarkan  addendum    The  terms  of  the  loan  based  on  addendum 
mengenai  ketentuan  komersial  yang  berlaku  regarding the prevailing commercial provisions 
terhadap fasilitas SCF sebagai berikut:  on the SCF facility are as follows: 
   
1.  Jenis  fasilitas  adalah  fasilitas  pembiayaan  1.  Type of facility is supplier financing facility. 
pemasok.   
   
2.  Batas fasilitas sebesar Rp 100.000.000.000.  2.  Facility limit of Rp 100,000,000,000. 
   
3.  Tujuan  fasilitas  untuk  membiayai  kebutuhan  3.  Purpose  of  the  facility  is  to  finance  the 
modal  kerja  pemasok  atau  sub  kontraktor  dari  working  capital  needs  of  suppliers  or  sub 
obligor  berdasarkan  program  pembiayaan  contractors  from  obligor  under  supplier 
pemasok.  financing program. 
   
4.  Periode ketersediaan adalah 26 Juli 2017 sampai  4.  Availability  period  is  from  July  26,  2017 
dengan tanggal 26 Juli 2018.  until July 26, 2018. 
   
5.  Ongkos pendanaan +1,1% per tahun.  5.  Funding Fee of +1.1% per annum. 
   
Fasilitas  pinjaman  ini  dijamin  dengan  piutang  usaha  These  loan  facilities  are  collateralized  by  trade 
Perusahaan dengan nilai  penjaminan 125% dari limit  accounts  receivable  with  minimum  collateral 
gabungan yang diikat secara fidusia.  value  125%  of  the  combined  limit  of 
  the Company bound under fiduciary. 
   
Berdasarkan  konfirmasi  fasilitas  No.  018/CF/CDU- Based on facility confirmation No. 018/CF/CDU-
NJ/RAD/18  tanggal  26  Juli  2018,  jangka  waktu  NJ/RAD/  18  dated  July  26,  2018,  the  term  of 
pinjaman selama 12 bulan sejak 26 Juli 2018 sampai  bank  loan  are  12  months  from  July  26,  2018 
dengan 26 Juli 2019 dan terdapat 2 fasilitas:  until July 26, 2019 and there are 2 facilities: 
   
1.  Fasilitas  Perdagangan  Tanpa  Komitmen  1.  Trading  Facility  without  Import 
Impor/Lokal  LC  dengan  limit  sebesar   Commitment  /  Local  LC  with  a  limit  of 
Rp  150.000.000.000,  jatuh  tempo  tanggal   Rp150,000,000,000,  due  on  January  26, 
26 Januari 2020.  2020. 
   
2.  Foreign  Exchange  Forward/SWAP  dengan  limit  2.  Foreign Exchange Forward / SWAP with a 
sebesar  USD  500.000,  jatuh  tempo  tanggal   limit  of  USD500,000,  due  on  January  26, 
26 Januari 2020.  2020 
   
Pada tanggal 30 September 2019 dan 31 Desember  As of September 30, 2019 and December 31, 
2018  saldo  pinjaman  WBP  kepada  Bank  of  Tokyo  2018 the balance of loan of WBP to PT  Bank 
Mitsubishi  UFJ,  Ltd  masing-masing  sebesar  of  Tokyo  Mitsubishi  UFJ,  Ltd  amounted  to  
Rp 450.000.000.000 dan Rp 450.000.000.000.  Rp 450,000,000,000 and Rp 450,000,000,000, 
respectively. 
   
 
 
 
 

139
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
8. PT Bank BTPN Tbk (d/h PT Bank Sumitomo 8. PT Bank BTPN Tbk (formerly PT Bank
Mitsui Indonesia) Sumitomo Mitsui Indonesia)
 
Berdasarkan  perjanjian  fasilitas  No.  SMBC/INS/0494    Based  on  credit  agreement  
tanggal  31  Oktober  2018,  Perusahaan  memperoleh  No.  SMBC/INS/0494  dated  October  31,  2018,   
fasilitas  kredit  dari  PT  Bank  BTPN  Tbk  sebagai  the  Company  obtained  credit  facilities  from  
berikut:  PT Bank BTPN Tbk as follows: 
   
1.  Loan on note 1 untuk tujuan modal kerja sebesar    1.  Loan  on  note  1  for  working 
Rp  200.000.000.000,  dengan  jangka  waktu  capital  purposes  amounted  to 
selama  12  bulan  sampai  dengan  tanggal  Rp  200,000,000,000,  with  a  term  of  12 
31  Oktober  2019  dengan  suku  bunga  9%  per  months  until  October  31,  2019  with  an 
tahun.  interest rate of 9% per annum. 
   
2.  Commercial  LC  untuk  tujuan  impor  atau  2.  Commercial LC for purposes of importing or 
pembelian  lokal  atas  bahan  baku  atau  peralatan  local  purchasing  of  raw  materials  or 
untuk  kegiatan  bisnis  Perusahaan  melalui  equipment  for  Company  business 
penerbitan  LC  dan  LC  usance  lokal,  sight,  LC  activities  through  the  issuance  of  LC  and 
usance,  payable  at  sight  (LC  UPAS),  LC  usance  LC local usance, sight, LC usance, payable 
payable  at  usance  (LC  UPAU)  sebesar  at  sight  (LC  UPAS),  LC  usance  payable  at 
Rp  500.000.000.000,  dengan  jangka  waktu  usance  (LC  UPAU)  amounted  to      
selama  12  bulan  sampai  dengan  tanggal  Rp  500,000,000,000,  with  the  term  of  12 
31 Oktober 2019.  months until October 31, 2019. 
   
3.  Acceptance  untuk  tujuan  akseptasi  LC  usance  3.  Acceptance for acceptance purposes of LC 
ataupun  LC  lokal  sebesar  Rp  500.000.000.000,  usance or local  LC of Rp 500,000,000,000, 
dengan jangka waktu enam (6) bulan.  with the term of six (6) months. 
   
4.  Loan  on  note  trust  receipt  untuk  tujuan  4.  Loan  on  note  trust  receipt  for  payment  of 
pembayaran  LC  ataupun  LC  lokal  sebesar           LC or local LC of Rp 500,000,000,000, with 
Rp  500.000.000.000,  dengan  jangka  waktu  the  term  of  three  (3)  months  from  the  LC 
selama  tiga  (3)  bulan  sejak  tanggal  jatuh  tempo  due date or if shorter and may be extended 
LC  atau  apabila lebih singkat dapat  diperpanjang  to six (6) months from the date of issuance 
hingga enam (6) bulan dari tanggal penerbitan LC  of  LC  or  local  LC  with  interest  rate  of  9% 
ataupun  LC  lokal,  dengan  suku  bunga  9%  per  per annum. 
tahun.   
   
5.  Guarantee  untuk  tujuan  penerbitan  bank  garansi  5.  Guarantee  for  issuance  of  bank  guarantee 
dalam  bentuk  payment  bond,  bid  bond,  in  the  form  of  payment  bond,  bid  bond, 
performance  bond,  dan  maintenance  bond,  performance  bond,  and  maintenance  bond, 
sehubungan  dengan  bisnis  peminjam,  sebesar  in  connection  with  the  borrower's  business 
Rp  500.000.000.000,  dengan  jangka  waktu  amounted  to  Rp  500,000,000,000,  with  a 
selama  12  bulan  namun  tidak  termasuk  periode  period  of  12  months  but  excluding 
klaim 30 hari kalender.  the 30-days calendar claim period. 
   
6.  Loan  on  note  account  payable  financing  untuk  6.  Loan  on  note  account  payable  financing 
tujuan  pembiayaan  terkait  dengan  pembayaran  for  financing  purposes  related  to 
kepada  supplier  peminjam  sebesar  payments  to  the  borrower's  suppliers  of 
Rp  500.000.000.000,  dengan  jangka  waktu  Rp  500,000,000,000,  with  a  maximum 
maksimum  selama  enam  (6)  bulan  dan  bersifat  period  of  six  (6)  months  and  is 
non-rolloverable,  dengan  suku  bunga  8,8%  per  nonextendable  and  interest  rate  8.8%  per 
tahun.  annum. 
     
Fasilitas pinjaman ini dijamin oleh piutang usaha saat    These  loan  facilites  are  collaterized  by  all 
ini  atau  akan  datang  dengan  nilai  penjaminan  current or  future trade accounts receivable with 
minimum  sebesar  Rp  625.000.000.000  atau  125%  minimum  collateral  value  amounted  to 
dari limit gabungan yang sudah diikat secara fidusia.  Rp  625,000,000,000  or  125%  of  the  combined 
limit and which has been tied by fiduciary. 
     
Pembatasan:    Negative covenants: 
     
1.  Memasang  atau  mengizinkan  adanya  atau    1.  Installing  or  permitting  the  presence  or 
dipasangnya Hak Jaminan atas aset-asetnya;  installation of security rights over its assets; 
   
2.  Menjual,  mengalihkan,  atau  melepaskan  aset- 2.  Sell,  transfer,  or  otherwise  dispose  of  its 
asetnya dengan ketentuan-ketentuan dimana aset- assets  with  the  provisions  in  which  these 

140
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
aset  tersebut dapat disewakan atau dibeli kembali  assets  can  be  leased  or  bought  back  by 
oleh Peminjam;  the Borrower; 
   
3.  Menjual,  mengalihkan,  atau  melepaskan  3.  Sell,  transfer,  or  dispose  of  its  receivables 
piutangnya dengan hak regres;  with resource; 
   
4.  Mengadakan  pengaturan  apapun  dimana  uang  4.  Entered  into  any  arrangement  where 
atau  manfaat  bank  atau  rekening  lain  dapat  the money or the benefits of a bank or other 
digunakan  untuk  pembayaran,  dilakukan  account  may  be  used  for  payments,  made 
kompensasi  (set  off)  atau  dimungkinkannya  compensation  (set  off)  or  the  possibility  of 
penggabungan beberapa rekening; atau  combining multiple accounts; 
   
5.  Mengadakan  pengaturan  prioritas  penerimaan  5.  Hold priority setting receipts have the same 
pembayaran yang memiliki dampak yang sama.  effect. 
     
Pada tanggal  30  September 2019  dan 31  Desember    As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  WBP  kepada  PT  Bank  BTPN  2018  the  balance  of  loan  of  WBP  to  PT  Bank 
Tbk masing-masing sebesar Rp 499.645.420.847 dan  BTPN  Tbk  amounted  to  Rp  499,645,420,847 
Rp 486.714.847.274.  and Rp 486,714,847,274, respectively.
   
9. PT Bank UOB Indonesia 9. PT Bank UOB Indonesia
   
Berdasarkan  Surat  Penawaran  tanggal  28  Agustus  Based  on  the  Letter  of  Offer  dated  August  28, 
2019  dari  PT  Bank  UOB  Indonesia,  WBP  2019  from  PT  Bank  UOB  Indonesia,  WBP 
memperoleh  fasilitas  kredit  dari  PT  Bank  UOB  obtained  a  credit  facility  from  PT  Bank  UOB 
Indonesia  berupa  fasilitas  Letter  of  Credit  (LC)  Indonesia  in  the  form  of  Letter  of  Credit  (LC) 
dan/atau  Surat  Kredit  Berdokumen  Dalam  and/or  Surat  Kredit  Berdokumen  Dalam  Negeri 
Negeri  (SKBDN)  hingga  jumlah  pokok  sebesar  (SKBDN)  up  to  the  principal  amount  of 
Rp  500.000.000.000,  dengan  jatuh  tempo  tanggal  Rp  500,000,000,000,  with  a  maturity  date  of 
22 Agustus 2020.   August 22, 2020. 
   
Fasilitas  ini  dijaminkan  dengan  Piutang  Usaha     This facility is collateralized by trade receivables 
dengan  nilai  loan-to-value  tidak  melebihi  80%  dari  with  a  loan-to-value  not  exceeding  80%  of  the 
nilai pendaftaran atau nilai penjaminan.  registration value or guarantee value. 
   
Pembatasan:  Negative Covenant: 
   
Menjaminkan  aset  tetap  kepada  pihak  lain,  kecuali  Securing  fixed  assets  to  other  parties,  except 
terhadap:  for: 
a.  Aset tetap yang saat ini telah dijaminkan kepada  a.  Fixed  assets  that  have  now  been  pledged 
kreditur  BUMN  sebelum  penggunaan  fasilitas  di  to  BUMN  creditors  prior  to  the  use  of 
Bank,  kecuali  atas  aset  yang  saat  ini  telah  facilities at the Bank, except for assets that 
dijaminkan  kepada  CIMB  Niaga  dimana  harus  have  now  been  pledged  to  CIMB  Niaga 
dilepaskan/roya sebelum penggunaan fasilitas di  which must be released/roya before the use 
Bank.  of facilities at the Bank. 
b.  Aset  tetap  yang  hanya  dapat  dijaminkan  untuk  b.  Fixed assets that can only be guaranteed to 
menjamin  pinjaman  jangka  panjang  atau  guarantee  long-term  loans  or  investment 
pinjaman  investasi  (jika  ada)  kepada  pemberi  loans (if any) to lenders. 
pinjaman. 
 
Perusahaan  diwajibkan  untuk  mempertahankan  Under  the  agreement,  the  Company  should 
interest service coverage ratio minimal 3 kali, debt to  maintain  interest  service  coverage  ration 
equity  ratio  maksimal  2,5  kali  dan  current  ratio  minimum  3  times,  debt  to  equity  ratio 
minimal 1 kali.   maximum 2.5 times and current ratio minimum 
1 time.  
   
Pada  tanggal  30  September  2019  dan  As  of  September  30,  2019  and  December  31, 
31  Desember  2018  saldo  pinjaman  WBP  kepada  2018,  the  balance  of  loan  of  WBP  to 
PT  Bank  UOB  Indonesia  masing-masing  sebesar  PT  Bank  UOB  Indonesia  amounted  to 
Rp 450.000.000.000 dan Nihil.  Rp 450,000,000,000 and Nil, respectively.  
   
 
 
 

141
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
10. PT Bank Permata Tbk 10. PT Bank Permata Tbk
 
Berdasarkan  Perjanjian  Pembiayaan  Musyarakah    According  to  the  Agreement  of  Finance 
Mutanaqisah  No.  18  tanggal  26  Juli  2018,   Method  of  Musyarakah  Mutanaqisah  No.  18 
WBP  memperoleh  Revolving  Financing  iB  (Baru)  dated  July  26,  2018,  WBP  obtained  
sebesar  Rp 300.000.000.000,  dengan  jangka  Revolving  Finance  iB  (New)  amounted  to  
waktu  12  bulan  sejak  ditandatangani,  dengan   Rp  300,000,000,000,  the  loan  term  for  
bagi  hasil  setara  9,25%  per  tahun.  Perjanjian  ini  12  months  since  signing  with  the  pricing 
telah  diperpanjang  sesuai  dengan  Surat   equivalent  to  9,25%  per  annum.
No.  254/BP/LOO/CRC-JKT/WB/VII/2019  sampai  This  agreement  has  been  extended  
dengan tanggal 26 Juli 2020. in  accordance  with  the  Letter  
No.  254/BP/LOO/CRC-JKT/WB/VII/2019  until 
July 26, 2020. 
 
Pembatasan terhadap tindakan:    Restriction of covenant:
     
1.  Bertindak  sebagai  penjamin  terhadap  hutang  1.  Binds  itself  as  surety  against  the  other 
pihak  lain,  kecuali  hutang  dagang  yang  dibuat  party,  except  in  order  to  perform  daily 
dalam rangka menjalankan usaha sehari-hari;  business activites; 
   
2.  Mengubah sifat dan kegiatan usaha yang sedang  2.  Change  the  business  activities  or  run 
dijalankan atau melakukan kegiatan usaha diluar  the  new  business  opening  other  than  an 
kegiatan usahanya sehari-hari;  existing business; 
   
3.  Menjaminkan,  mengalihkan,  menyewakan,  3.  Mortgaging, transferring, leasing, submitting 
menyerahkan  kepada  pihak  lain  atas  barang  collateral to the other party; 
jaminan.   
   
4.  Memberikan  pinjaman  maupun  fasilitas  4.  Provide loans or other financial facility to or 
keuangan  kepada  atau  dari  pihak  lain  kecuali  from  the  other  party  except  for  short-term 
dalam  jangka  pendek  dan  dalam  rangka  and  in  order  to  drive  the  daily  business 
menunjang kegiatan usahanya sehari-hari;  activities; 
5.  Melakukan  penyertaan  yang  berpengaruh  5.  Make  new  investments  that  could  affect  to 
terhadap kemampuan membayar;  the payment quality; 
   
6.  Melakukan  tindakan  lainnya  yang  dapat  6.  Taking  actions  that  could  affect 
menyebabkan  atau  terganggunya  kewajiban  the obligation to the bank; 
yang terhutang kepada bank;   
   
7.  Melakukan  pembubaran,  penggabungan  usaha  7.  Liquidation  of  corporate,  business 
dan/  atau  peleburan  dengan  Perusahaan  lain  combination,  and/  or  merger  with  other 
atau  memperoleh  sebagian  besar  dari  aset  dari  Company  or    obtain  the  part  of  other 
Perusahaan  lain  atau  bentuk  perubahan  usaha  Company’s  assets  or  other  business 
lainnya;  changes; 
   
8.  Mengubah  susunan  dan  jumlah  kepemilikan  8.  Change  the  form  and  quantities  of 
pemegang  saham  tertutup  dan/  atau  pemegang  the  shareholder  (except  Stated  Owned 
saham  pengendali  Perusahaan  terbuka  (kecuali  Enterprise),  pay  or  declare    of  dividend  or 
BUMN),  membayar  atau  menyatakan  dapat  distribute  the  gain  in  any  form  of  shares 
dibayar  suatu  dividen  atau  pembagian  issued; 
keuntungan  berupa  apapun  juga  atas  saham   
yang dikeluarkan;   
   
9.  Membayar  kembali  tagihan  atau  piutang  berupa  9.  Repay the bills or receivables that will given 
apapun  juga  yang  sekarang  telah  dan/  atau  now and/ or later from shareholders. 
dikemudian  hari  akan  diberikan  oleh  pemegang 
saham. 
   
Berdasarkan  surat  No.  0050/SK/CB3/WB/4/2019  Based  on  the  letter  No.  0050/SK/CB3/WB/4/ 
tanggal  18  April  2019,  Bank  Permata  memberikan  2019  dated  April  18,  2019,  Bank  Permata 
persetujuan waiver atas pembayaran dividen tahun  approved  to  waive  restriction  concerning 
2019.  payment of dividends in 2019. 
   
   

142
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Berdasarkan surat  No. 239/WBP/DIR/2019 tanggal  Based  on  the  letter  No.239/WBP/DIR/2019 
15  April  2019,  Bank  Permata  memberikan  dated April 15, 2019, Bank Permata approved 
persetujuan  waiver  atas  pembatasan  memperoleh  to waive restriction concerning obtain or add a 
pinjaman dari bank atau lembaga keuangan lain.   loan from a bank or other financial institution. 
   
Pada  tanggal  30  September  2019  dan   As of September 30, 2019 and December 31, 
31  Desember  2018  saldo  pinjaman  WBP  kepada  2018,  the  balance  of  loan  of  WBP  to  
PT  Bank  Permata  Tbk  masing-masing  sebesar   PT  Bank  Permata  Tbk  amounted  to  
Rp 300.000.000.000 dan Rp 300.000.000.000.   Rp 300,000,000,000 and Rp 300,000,000,000, 
respectively. 
   
11. PT Bank CTBC Indonesia 11. PT Bank CTBC Indonesia
   
Berdasarkan  surat  No.  MKT/EXT/138/VII/2017  Based  on  letter  No.  MKT/EXT/138/VII/2017 
tanggal  12  Juli  2017,  Perusahaan  memperoleh  dated  July  12,  2017,  the  Company  obtained 
fasilitas  kredit  dari  CTBC  berupa  kredit  modal  kerja  credit facility from CTBC in the form of working 
sebesar  Rp  300.000.000.000,00  dengan  jangka  capital loan amounted to Rp 300,000,000,000, 
waktu  selama  12  bulan  sejak  tanggal  12  Juli  2017  with the term of 12 months from July 12, 2017 
sampai  dengan  tanggal  12  Juli  2018  dengan  until  July  12,  2018  with  an  interest  rate  of 
suku  bunga  JIBOR+2,0%  per  tahun.  Perjanjian  JIBOR+2.0%  per  annum.  This  facility  has 
ini  telah  diperpanjang  lagi  berdasarkan  surat  recently  been  extended  again  based  on  loan 
persetujuan  perpanjangan  fasilitas  kredit  extension  approval  letter  No.  MKT/EXT/128/ 
No.  MKT/EXT/128/VII/2019  tanggal  13  Agustus  VII/2019 dated August 13, 2019, with a term of 
2019,  dengan  jangka  waktu  12  bulan  sampai  12 months until August 15, 2020. 
dengan tanggal 15 Agustus 2020. 
 
Fasilitas  pinjaman  ini  dijamin  oleh  piutang  usaha  This  loan  facility  is  colaterallized  by  trade 
dari proyek WSKT untuk proyek Pemerintah minimal  accounts  receivable  from  WSKT  project  for  a 
100%  dari  pinjaman  yang  beredar  saat  ini  yang  Government  project  for  minimum  of  100%  of 
sudah  diikat  secara  fidusia.  Daftar  piutang  usaha  current  outstanding  loan  which  ties  by 
akan diperbaharui setiap 6 bulan.  fiduciary. The  list of trade  accounts  receivable 
  will be updated every 6 months. 
   
Pembatasan terhadap tindakan:  Negative covenants or restrictions: 
   
1.  Mengubah  kegiatan  usaha  sebagaimana  1.  Changing  the  business  activities  as  stated 
tercantum  dalam  anggaran  dasar  yang  dapat  in the Company’s article of association that 
mengurangi  kemampuan  melunasi  fasilitas  could reduce the ability to pay off the credit 
kredit.  facility. 
   

2.  Menjual  atau  mengalihkan  seluruh  aset  2.  Sell  or  transfer  all  of  assets  of        
Perusahaan  dalam  satu  transaksi  atau  dalam  the  Company  in  a  single  transaction  or  in  
beberapa transaksi, kecuali:  multiple transactions, except: 
  Menjual  atau  mentransfer  aset  dibawah    Selling  or  transferring  assets  under 
ketentuan  arm’s  length  dan  dengan  tujuan  arrangement  that  are  at  arm’s  length 
melakukan kegiatan usaha;  and  in  order  to  run  the  daily  business 
  activities; 
  Menjual  atau  mentransfer  aset  sebagai    Selling  or  transferring  assets  as  a 
pengganti  atau  diganti  dengan  aset  lain  replace  or  to  be  replaced  with  another 
yang  sebanding  atau  lebih  baik  menurut  comparable  assets  or  better  in  type, 
jenis, sifat, kualitas;  nature, quality; 
  Menjual  atau  mengalihkan  aset  untuk    Selling  or  transferring  assets  for      
keperluan reorganisasi pemerintah Republik  the  purpose  of  government 
Indonesia  selama  penjualan  aset  tidak  reorganization  of  the  Republic  of  
memiliki hasil material;  Indonesia as long as the sale of assets 
  did not have a material result; 
  Menjual  atau  mentransfer  aset  yang  tidak    Selling  or  transferring  assets  that  are 
berguna  atau  tidak  digunakan  dengan  not  useful  or  are  not  anymore  used 
persyaratan arm’s length; dan  with  the  requirements  of  arm’s  length; 
  and 
  Penjualan  pengalihan  aset  per  tahun    Selling  of  transferring  assets  per  year 
melebihi Rp 500.000.000.000.  exceeding of  Rp 500,000,000,000. 
   
 

143
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
3.  Mengubah operasional bisnis saat ini yang dapat  3.  Changing the operation of current business 
menyebabkan  hasil  material  kecuali  diwajibkan  that  may  cause  material  impact  unless 
oleh hukum yang berlaku;  required by appllicable law 
 
4.  Penggabungan,  pemisahan,  likuidasi  atau  4.  Merging,  business  combination, 
rekonstruksi  Perusahaan  kecuali  persyaratan  separation,  liquidation  or  corporate 
sebagai berikut:  reorganization  except  the  following 
  requirements: 
  Reorganisasi  dapat  dilakukan  oleh    Reorganization  can  be  done  by   
Pemerintan Republik Indonesia selama tidak  the  Government  of  the  Republic  of 
memiliki dampak yang material;  Indonesia  as  long  as  the  impact  is  not 
  material; 
  Tindakan  Perusahaan  dengan  anggota  lain    The  corporate  actions  with  
dalam  kelompok  dengan  ketentuan  other  members  in  the  group  
mengikuti persyaratan;  with  the  provision  following  
  the requirements; 
  Perusahaan  akan  bertahan  sebagai  badan    The  Company  will  survive  as  legal 
hukum  dan  akan  memiliki  status  hukum  entity  and  will  have  the  legal  status 
setelah tindakan korporasi; dan  after the corporate action; and 
  Pemisahan  dimana  Perusahaan  menjadi    Separation  which  the  Company 
pemegang saham terbesar.  becomes the mayor shareholder. 
 
5.  Perubahan  Anggaran  Dasar  yang  dapat  5.  Changes in the Articles of Association that 
menimbulkan akibat material;  can lead to material impact; 
   
6.  Mengikat  dirinya  sendiri  sebagai  jaminan  6.  Bind itself as a collateral against the other 
terhadap  pihak  lain  dan/  atau  menjamin  party  and/  or  pledging  the  Company’s 
kekayaan Perusahaan kepada pihak lain, kecuali  assets  to  other  parties,  except  those  that 
yang sudah ada;  are already existing; 
 
7.  Usulkan  berkas  kebangkrutan  atau  penundaan  7.  Proposing  a  file  of  bankruptcy  or 
pembayaran  utang  kepada  pihak  yang  postponement  of  debt  payment  to 
berwenang; dan  authorized parties; and 
 
8.  Melunasi  utang  kepada  pemegang  saham/utang  8.  Repay  the  debt  to  shareholders/  limited 
Perusahaan  terbatas  sebelum  bank  melunasi  company’s  debt  before  the  bank  repays 
utangnya terlebih dahulu.  the debt in advance. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  WBP  kepada  PT  Bank  2018  the  balance  of  loan  of  WBP  to  
CTBC  Indonesia  masing-masing  sebesar  PT  Bank  CTBC  Indonesia  amounted  to  
Rp 300.000.000.000.  Rp 300,000,000,000, respectively. 
   
12. PT Bank BCA Syariah 12. PT Bank BCA Syariah
   
Berdasarkan  Pemberitahuan  Pemberian  Fasilitas  Based  on  the  Notification  of  Provision  of 
Pembiayaan  No.  056/ADP/2018,  tanggal  6  Juni  Financing Facilities No. 056 / ADP / 2018, dated 
2018  dengan  PT  Bank  BCA  Syariah,  WBP  June 6, 2018 with PT Bank BCA Syariah, WBP 
memperoleh  fasilitas  kredit  dari  PT  Bank  BCA  obtained  a  credit  facility  from  PT  Bank  BCA 
Syariah berupa PMK Musyarakah (Revolving), yang  Syariah  in  the  form  of  Musharaka  PMK 
peruntukannya  adalah  sebagai  modal  kerja  (Revolving),the  designation  of  which  was  as 
Proyek  pembangunan  infrastruktur  dan  tagihan  working  capital  Infrastructure  development 
penjualan  (piutang  usaha)  khusus  kepada  projects  and  special  sales  receivables  (trade 
PT  Waskita  Karya  (Persero)  Tbk  dan  entitas  anak  receivables)  to  PT  Waskita  Karya  (Persero) 
sebesar Rp 100.000.000.000, dengan jangka waktu  Tbk  and  subsidiaries  amounted  to 
pinjaman  selama  12  bulan.  Jangka  waktu  pinjaman  Rp  100,000,000,000,  with  a  loan  period  of 
ini telah diperpanjang berdasarkan Perubahan Akad  12  months.  The  term  of  this  loan  has  been 
Pemberian Limit Fasilitas Pembiayaan (Line Facility)  extended  based  on  the  Changes  to 
No.  303/PRBH-BCAS/VI/19  menjadi  tanggal  6  Juni  the  Agreement  on  the  Granting  of  the  Line 
2020.  Facility  No.  303/PRBH-BCAS/VI/19  to  June  6, 
  2020. 
   
Fasilitas  ini  dijaminkan  dengan  Piutang  Usaha     This  loan  facility  is  secured  with                   
senilai Rp 120.000.000.000 (Catatan 5).  account  receivable  amounted  to 
Rp 120,000,000,000 (Note 5).  

144
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pembatasan:  Negative Covenant: 
   
Nasabah sebelum atau sesudah pinjaman diberikan  The  Customer  before  or  after  the  facility 
oleh  bank,  juga  mempunyai  utang  kepada  pihak  provided  by  the  bank,  having  loan  to  the  third 
ketiga  dan  hal  yang  demikian  tidak  diberitahukan  party that not inform to the bank. 
kepada bank.   
   
Berdasarkan  surat  No.  205/WBP/DIR/2019  tanggal  Based  on  the  letter  No.  205/WBP/DIR/2019 
1  April  2019,  Bank  BCA  Syariah  memberikan  dated  April  1,  2019,  Bank  BCA  Syariah 
persetujuan  waiver  atas  pembatasan  memperoleh  approved to  waive  restriction concerning obtain 
pinjaman dari bank atau lembaga keuangan lain.  or  add  a  loan  from  a  bank  or  other  financial 
  institution. 
   
Pada  tanggal  30  September  2019  dan  As  of  September  30,  2019  and  December  31, 
31  Desember  2018  saldo  pinjaman  WBP  kepada  2018  the  balance  of  loan  of  WBP  to  PT Bank 
PT  Bank  BCA  Syariah  masing-masing  sebesar  BCA Syariah amounted to Rp 100,000,000,000, 
Rp 100.000.000.000.  respectively.  
   
13. PT Bank ICBC Indonesia 13. PT Bank ICBC Indonesia
   
Berdasarkan  Perjanjian  Kredit  No.  38  tanggal  Based on the Credit Agreement  No. 38 dated 
20 Desember  2016,  WBP  mendapatkan  kredit  December 20, 2016, WBP obtained a working 
modal  kerja  dari  PT  Bank  ICBC  Indonesia  dengan  capital  loan  from  PT  Bank  ICBC  Indonesia 
jumlah  fasilitas  sebesar  Rp  400.000.000.000  yang  with  total  facility  amounted  to  
terbagi  atas  2  tranche  dimana  tranche  A  sebesar  Rp  400,000,000,000  divided  over  2  tranche 
Rp 200.000.000.000 merupakan committed line dan  which  tranche  A  amounted  to  
tranche  B  sebesar  Rp  200.000.000.000  merupakan  Rp  200,000,000,000  is  a  committed  line  and 
uncommitted  line,  jangka  waktu  pinjaman  1  tahun  tranche B amounted to Rp 200,000,000,000 is 
sejak  penandatanganan  perjanjian.  Adapun  suku  uncommitted  Line,  loan  period  of  one  year 
bunga  dari  tranche  A  sebesar  10%  per  tahun  from  the  signing  of  the  agreement.  
(floating)  dan  tranche  B  sebesar  9,75%  per  tahun  The  interest  rate  on  the  tranche  A  amounted 
(floating).  to 10% per annum (floating) and tranche B of 
9.75% per annum (floating). 
   
Fasilitas  ini  telah  diperpanjang  berdasarkan  surat  This  facility  has  been  extended  based  
persetujuan  perpanjangan  fasilitas  kredit  on  loan  extension  approval  letter 
No. 018/CBIII/ICBC/I/2018  tanggal  29 Januari  2018,  No. 018/CBIII/ICBC/I/2018  dated  January  29, 
dengan  jangka  waktu  sebelas  (11)  bulan  sampai  2018,  extending  the  term  of  loan  for  eleven 
dengan  tanggal  20  Desember  2018,  dengan  (11)  months  until  December 20,  2018  and 
adendum  suku  bunga  tranche  A  9,25%  per  tahun  amending  the  interest  rate  on  tranche  A  to 
dan tranche B 9.00% per tahun.  9.25% per annum and tranche B to 9.00% per 
annum. 
   
Fasilitas pinjaman ini dijamin dengan:  This loan facility is collateralized by: 
 
1.  Piutang  usaha WBP  yang  diikat  secara  fidusia,  1.  Trade  accounts  receivable  of  WBP  bound 
berdasarkan  Akta  Jaminan  Fidusia  No.  39  under  fiduciary,  based  on  Fiduciary 
tanggal  20  Desember  2016,  senilai  Security  Deed  No.39  dated  December 20, 
Rp 500.000.000.000 2016, amounting to Rp 500,000,000,000 
 
2.  Sisa nilai  atau omzet  kontrak WBP  -  kontraktor  2.  Future  receivables  value  or  turnover  
harus dengan PT Waskita Karya (Persero) Tbk of WBP - contractors must by PT Waskita 
Karya (Persero) Tbk. 
   
Pada  tanggal  30  September  2019  dan   As  of  September  30,  2019  and  December  
31  Desember  2018  saldo  pinjaman  WBP  kepada  31,  2018  the  balance  of  loan  of  WBP  to  
PT  Bank  ICBC  Indonesia  masing-masing  sebesar  PT  Bank  ICBC  Indonesia  amounted  to  
Rp 87.421.248.107 dan Rp 700.000.000.000.  Rp 87,421,248,107 and Rp 700,000,000,000, 
respectively. 
   
14. PT Bank CIMB Niaga Tbk 14. PT Bank CIMB Niaga Tbk
 
Berdasarkan  surat  perjanjian  No.  049/PP/CB/JKT/  Based  on  letter  of  contract  
2018 tanggal 15 Agustus 2018 dengan CIMB Niaga,  No.  049/PP/CB/JKT/2018  dated  August  15, 
WBP  memperoleh  fasilitas  pembiayaan  transaksi  2018  with  CIMB  Niaga,  WBP  obtained  a 

145
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
khusus  Murabahah,  On  Revolving  Basis,  Murabahah,  On  Revolving  Base,  and 
Uncommitted  untuk  pembelian  berupa  bahan  baku  Uncommitted  transaction  spesific  financing 
dan/atau bahan  pendukung  produksi beton  dengan  facility  for  purchases  in  the  form  of  raw 
jumlah  fasilitas  sebesar  Rp  77.695.194.234  dalam  materials  and/or  concrete  production 
jangka  waktu  tiga  (3)  bulan  sejak  tanggal   supporting  materials  with  a  total  facility  of  
16  Agustus  2018  sampai  dengan  tanggal   Rp  77,695,194,234  in  three  (3)  months  from 
16  Nopember  2018  dan  dengan  margin  Bank  August 16, 2018 until November 16, 2018 and 
sebesar Rp 1.836.628.064. with a bank margin of Rp 1,836,628,064.
   
Fasilitas-fasilitas ini telah diperpanjang berdasarkan  These  facility  has  been  extended  based  on 
surat  persetujuan  perpanjangan  fasilitas  kredit  loan  extension  approval  letter 
No. 231/OL/CBGIII/XI/18  tanggal  14 November  No.231 /OL/CBGIII/XI//18 dated November 14, 
2018,  dengan  jangka  waktu  sembilan  (9)  bulan  2018,  extending  the  term  of  loan  for  nine  (9) 
sampai dengan tanggal 16 Agustus 2019.   months until August 16, 2019. 
     
Berikut rincian fasilitas kredit yang diberikan:    Following are the details of the credit facilities 
provided: 
     
  Fasilitas  commercial  credit  lines,  revolving,      Commercial  credit  lines  facility,  revolving, 
uncommitted,  sebesar  Rp  300.000.000.000  uncommitted,  amounted  to  
dengan jangka waktu selama Sembilan (9) bulan  Rp 300,000,000,000, with a term of nine (9) 
sejak  tanggal  14  Nopember  2018  sampai  months  from  November  14,  2018  until 
dengan  tanggal  16  Agustus  2019  dan  dengan  August  16,  2019  and  with  an  interest  rate 
suku bunga 9,5% per tahun. of 9.5% per annum. 
     
  Fasilitas  trust  receipt,  revolving,  uncommitted,      Trust  receipt  facility,  revolving, 
sebesar  Rp  200.000.000.000  dengan  jangka  uncommitted,  amounted  to  
waktu  selama  Sembilan  (9)  bulan  sejak  tanggal  Rp 200,000,000,000, with a term of nine (9) 
14  Nopember  2018  sampai  dengan  tanggal  16  months  from  November  14,  2018  until 
Agustus 2019. August 16, 2019. 
     
  Fasilitas  bank  garansi,  revolving,  uncommitted,      Bank  guarantee  facility,  revolving, 
sebesar  Rp  200.000.000.000  dengan  jangka  uncommitted,  amounted  to  
waktu  selama  Sembilan  (9)  bulan  sejak  tanggal  Rp 200,000,000,000, with a term of nine (9) 
14  Nopember  2018  sampai  dengan  tanggal   months  from  November  14,  2018  until 
16 Agustus 2019 dan dengan suku bunga 9,5%  August  16,  2019  and  with  an  interest  rate 
per tahun.  of 9.5% per annum. 
     
  Fasilitas  pinjaman  transaksi  khusus      Musyarakah  Special  transaction  facility, 
Musyarakah,  revolving,  uncommited,  sebesar   revolving,  uncommitted,  amounted  to  
Rp  300.000.000.000  dengan  jangka  waktu  Rp 300,000,000,000, with a term of nine (9) 
selama  Sembilan  (9)  bulan  sejak  tanggal   months  from  November  14,  2018  until 
14  Nopember  2018  sampai  dengan  tanggal   August  16,  2019  and  with  an  interest  rate 
16 Agustus 2019 dan dengan suku bunga 9,6%  of 9.6% per annum. 
per tahun. 
     
Fasilitas pinjaman ini dijaminkan dengan:    These loan facilities are collateralized by: 
   
a.  Hak  Guna  Bangunan  (SHGB)   a.  Building  use  right  (SHGB)  
No.  28/  Kaliangsana  meliputi  seluas  147  m2  No.  28/  Kaliangsana  covering  an  area  of 
yang  terletak  di  Desa  Kaliangsana,  Kecamatan  147  sqm  located  in  the  Kaliangsana 
Kalijati,  Kabupaten  Subang,  Jawa  Barat  atas  Village,  Kalijati  Sub  District,  Subang 
nama Perusahaan sebesar Rp 131.186.250.000.  Regency,  West  Java  under  the  name  of  
the  Company  amounting  to  
Rp 131,186,250,000. 
     
b.  Fidusia  atas  piutang  usaha  Perusahaan    b.  Fiduciary on the Company’s trade accounts 
dengan  nilai  penjaminan  minimal  sebesar   receivable  with  minimum  collateral  value 
Rp 500.000.000.000.  amounting to Rp 500,000,000,000. 
     
Pada tanggal  30  September 2019  dan 31  Desember    As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  WBP  kepada  PT  Bank  CIMB  2018  the  balance  of  loan  of  WBP  to  PT  Bank 
Niaga  Tbk  masing-masing  sebesar  Nihil  dan  CIMB  Niaga  Tbk  amounted  to  Nil  and  
Rp 299.824.895.228.  Rp 299,824,895,228, respectively.
   

146
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
15. PT Bank Pembangunan Daerah Banten Tbk 15. PT Bank Pembangunan Daerah Banten Tbk

Berdasarkan  surat  No.027/KRM-BB/IL/VII/2018  According  to  the  Letter  No.027/KRM-


Perusahaan  memperoleh  fasilitas  kredit  dari   BB/IL/VII/2018,  the  Company  obtained  into 
PT  Bank  Pembangunan  Daerah  Banten  Tbk  (BPD  the credit facilities from PT Bank Pembangunan 
Banten)  berupa  kredit  modal  kerja  sebesar   Daerah  Banten  Tbk  (BPD  Banten)  form  of 
Rp  70.000.000.000,  dengan  jangka  waktu  9  bulan  working  capital  credit  amounted  to 
sejak  tanggal  23  Juli  2018  sampai  dan  dapat  Rp 70,000,000,000,  the  loan  term  for  9  months 
diperpanjang  sesuai  dengan  kebutuhan  dengan  since  date  of  July  23,  2018  and  could  be 
suku bunga 9,5% p.a efektif rate.   extended based on needed with the interest rate 
of 9.5% p.a effective rate.  
   
Pada  tanggal  30  September  2019  dan   As  of  September  30,  2019  and  December  31, 
31  Desember  2018  saldo  pinjaman  WBP   2018  the  balance  of  loan  of  WBP  to  PT  Bank 
kepada  PT  Bank  Pembangunan  Daerah   Pembangunan  Daerah  Banten  Tbk.  amounted 
Banten  Tbk  masing-masing  sebesar  Nihil  dan   to Nil and Rp 50,000,000,000, respectively.  
Rp 50.000.000.000. 
   
Entitas Anak – WTR Subsidiary – WTR
   
PT Bank Rakyat Indonesia (Persero) Tbk.   PT Bank Rakyat Indonesia (Persero) Tbk.  
 
a.  Perjanjian Kredit dan Fasilitas Kredit CTP  a.  Loan Agreement and Loan Facility CTP 
     
CTP  mendapatkan  fasilitas  kredit  dari    CTP  obtained  credit  facility  from  PT  Bank 
PT  Bank  Rakyat  Indonesia  (Persero)  Tbk  sebesar  Rakyat  Indonesia  (Persero)  Tbk  amounted  to 
Rp  1.800.000.000.000.  Kredit  ini  untuk  dana  Rp  1,800,000,000,000.  This  credit  is  for  land 
talangan  tanah,  dengan  jangka  waktu  selama  bailout,  with  a  term  of  24  months  and  interest 
24  bulan  dan  tingkat  bunga  sebesar  8,75%  per  rate of 8.75% per annum. 
tahun. 
     
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018, saldo pinjaman CTP kepada PT Bank Rakyat  2018,  the  balance  of  loan  of  CTP  to 
Indonesia  (Persero)  Tbk  masing-masing  sebesar  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
Rp 1.097.962.790.709 dan Rp 666.633.907.946.  amounted  to  Rp  1,097,962,790,709  and 
Rp 666,633,907,946, respectively.  
 
b.  Perjanjian Kredit dan Fasilitas Kredit KKDM  b.  Loan Agreement and Loan Facilitie KKDM 
     
Berdasarkan  akta  notaris  No.  37  tanggal  31  Mei  Based on the notarial deed No. 37 dated May 
2018  dari  notaris  Sriyani  Burlian,  S.H.,  KKDM  31,  2018  from  notary  Sriyani  Burlian,  S.H., 
mendapatkan  fasilitas  kredit  untuk  dana  talangan  KKDM  obtained  a  credit  facility  for  land 
tanah  dengan  maksimum  plafond  sebesar   bailouts  with  a  maximum  ceiling  amounted  to  
Rp 1.380.074.000.000 dengan ketentuan:  Rp  1,380,074,000,000  with  the  following 
  provisions: 
-  Fasilitas Tranche I sebesar Rp 370.779.000.000  -  Tranche  I  facility  amounted  to 
   Rp 370,779,000,000 
-  Fasilitas  Tranche  II  sebesar   -  Tranche  II  facilities  amounted  to  
Rp 1.009.295.000.000  Rp 1,009,295,000,000 
   
Jangka waktu fasilitas kredit adalah 24 bulan setelah  The  credit  facility  period  is  24  months  after 
penandatanganan  akta  perjanjian  kredit  dengan  the  signing  of  the  loan  agreement  with  an 
bunga  sebesar  8,25%  per  tahun.  Seluruh  tagihan  interest  of  8.25%  per  annum.  All  land  bailout 
dana  talangan  tanah  dan  rekening  pengembalian  bills and land bailout refund accounts are used 
dana  talangan  tanah  digunakan  sebagai  jaminan  as collateral to the bank. 
kepadan bank. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018 saldo pinjaman KKDM kepada PT Bank Rakyat  2018,  the  balance  of  loan  of  CTP  to 
Indonesia  (Persero)  Tbk  masing-masing  sebesar  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
Rp 1.288.554.497.370 dan Rp 592.618.787.538.  amounted  to  Rp  1,288,554,497,370  and 
Rp 592,618,787,538, respectively.  
 

147
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
23. UTANG LEMBAGA KEUANGAN NON-BANK   23. LOAN TO FINANCIAL INSTITUTION NON-BANK 

a. Bagian Jangka Pendek a. Short-Term Portion

30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Pihak Berelasi/ Related Parties


Perusahaan/ The Company
PT Sarana Multi Infrastruktur (Persero) (SMI) 508.845.493.920 392.616.610.781
Jumlah/ Total 508.845.493.920 392.616.610.781

Perusahaan The Company


   
  PT Sarana Multi Infrastruktur (Persero) (SMI)      PT  Sarana  Multi  Infrastruktur  (Persero) 
(SMI) 

Sindikasi Transmisi 500 KV Sumatera Transmission 500 KV Sumatera


Syndication Loan 
     
Berdasarkan  Perjanjian  Kredit  Sindikasi  No.  25    Based on the Syndicated Credit Agreement 
tanggal  23  Mei  2016,  Perusahaan  memperoleh  No.  25  dated  May  23,  2016,  the  Company 
fasilitas  kredit  sindikasi  PT Bank  Rakyat  obtained  syndicated  credit  facilities  from 
Indonesia  (Persero)  Tbk  dan  PT Bank  Central  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk  
Asia  Tbk  sebesar  maksimum  and  PT  Bank  Central  Asia  Tbk  for  a 
Rp 4.402.500.000.000  dengan  suku  bunga  maximum       of Rp 4,402,500,000,000 with 
reference  rate  (Average  Time  Deposit)  untuk  a  reference  rate  (Average Time Deposit) 
jangka waktu 3 bulan ditambah marjin.  Fasilitas  for  3  months  period  plus    a    maximum 
tersebut  memiliki  jangka  waktu  3  tahun  atau  margin. The facility has a period of 3 years 
maksimum  4  tahun  dalam  hal  BAST  1  untuk  or  a  maximum  of  4  years  in  the  case  of 
Proyek  Transmisi  Paket  1  dan  2  tidak  diterima  BAST  1  for  Transmisi  Projects  package  1 
dalam  waktu  3  tahun  setelah  perjanjian  kredit  and  2  not  received  within  3 years  after  the 
ditandatangani.  Pada  tanggal  10 Juli  2017  credit  agreement  is  signed.  On  July  10, 
melalui  Sertifikat  Pengalihan  Kredit,  PT  Bank  2017  through  the  Credit  Transfer 
Rakyat  Indonesia  (Persero)  Tbk  melimpahkan  Certificate,  PT  Bank  Rakyat  Indonesia 
sebagian porsinya sebagai kreditur ke Lembaga  (Persero)  Tbk  delegated  part  of  its  portion 
Pembiayaan  Ekspor  Indonesia,  PT  Bank  as  a  creditor  to  the  Lembaga  Pembiayaan 
Maybank  Indonesia  Tbk,  dan  PT Sarana  Multi  Ekspor  Indonesia,  PT  Bank  Maybank 
Infrastruktur (Persero).  Indonesia  Tbk,  and  PT  Sarana  Multi 
Infrastruktur (Persero). 
   
Berdasarkan  surat  PT Bank  Rakyat  Indonesia  Based  on  the  letter  of  PT  Bank  Rakyat 
(Persero)  Tbk  No.  B-645-SJK/SDK/06/2019  Indonesia  (Persero)  Tbk  No.  B-645-
tanggal 21 Juni 2019 selaku Agen, Fasilitas suku  SJK/SDK/ 06/2019 dated June 21, 2019 as 
bunga  yang  berlaku  untuk  fasilitas  kredit  an Agent, the interest rate facility applicable 
sindikasi  adalah  reference  rate  ditambah  marjin  to  syndicated  credit  facilities  is  the 
maksimal sebesar 9,825% per tahun.  reference  rate  plus  a  maximum  margin  of 
9.825% per year 
   
Tujuan  dari  fasilitas  kredit  sindikasi  ini  adalah  The  purpose  of  the  syndicated  credit 
untuk  membiayai  kebutuhan  modal  kerja  facility  is  to  finance  the  working  capital 
konstruksi  pengadaan  transmisi  500  kV  needs  for  construction  procurement  of 
Sumatera  (“Proyek  Transmisi  Sumatera”)  yang  Sumatera 500 kV transmission ("Sumatera 
terdiri  dari  pengadaan  transmisi  dengan  rute  Transmission  Project")  consisting  of 
New  Aur  Duri  –  Peranap  (Seksi 1)  dan  rute  procurement  transmission  route  New  Aur 
Peranap – Perawang (Seksi 2).  Duri  -  Peranap  (Section  1)  and  
the Peranap - Perawang (Section 2). 
   
Setelah berita acara serah terima untuk masing- After the handover for each  work package 
masing paket pekerjaan diserahkan kepada PLN  submitted  to  PLN  as  the  owner  of     
selaku  owner  proyek,  sumber  pelunasan  dari  the  project,  the  source  of  repayment  of           
fasilitas  kredit  ini  akan  beralih  secara  langsung  the credit facility will be switched directly to 
kepada  owner.  Seluruh  tagihan  atas  pekerjaan  the owner.  The entire bill for the work and 

148
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
dan  tagihan  atas  klaim  asuransi  terkait  proyek  the  bill  on  insurance  claims  related  to 
yang  dibiayai  menjadi  jaminan  atas  fasilitas  projects financed as collateral for the credit 
kredit ini.  facility. 
   
Perjanjian  ini  juga  mencakup  batasan-batasan  This  Agreement  also  includes  restrictions 
yang  tidak  diperkenankan  dilakukan  oleh  to  the Company and not permitted without 
Perusahaan  tanpa  persetujuan  tertulis  terlebih  prior  written  approval  from  the  Bank, 
dahulu dari Bank antara lain:  among others: 
   
a.  Memberikan  jaminan  Perusahaan  (corporate  a.  Providing  corporate  guarantees  to 
guarantee)  kepada  pihak  lain,  kecuali  untuk  other  parties,  except  to  guarantee     
menjamin  kewajiban  Anak  Perusahaan  yang  the  obligations  of  Subsidiaries 
menjalankan  kegiatan  usaha  yang  termasuk  conducting  business  activities  that  fall 
dalam  maksud  dan  tujuan  Perusahaan  yang  within  the  aims  and  objectives  of  
dimuat dalam anggaran dasarnya;  the Company contained in their articles 
  of association; 
   
b.  Melakukan  permohonan  pailit  dan  b.  Conducting bankruptcy application and 
permohonan  penundaan  pembayaran  requesting  for  postponement  of 
kepada  instansi  yang  berwenang  payment  to  authorized  institution 
(pengadilan);  (court); 
   
c.  Menjual  atau  melepaskan  harta  tidak  c.  Selling  or  releasing  immovable 
bergerak  atau  harta  kekayaan  utama  dalam  property  or  principal  assets  in     
menjalankan  usahanya,  kecuali  tidak  the course of its business, except as it 
mempengaruhi kewajiban pembayaran utang  does  not  affect  the  debt  service 
Debitur;  obligation of the Borrower; 
   
d.  Melakukan  akuisisi,  merjer,  konsolidasi,  d.  To  acquire,  merge,  consolidate, 
pemisahan  atau  membeli  atau  dengan  cara  segregate  or  purchase  or  otherwise 
lain  memperoleh  Perusahaan  atau  saham- acquire  a  company  or  shares  in  a 
saham dalam Perusahaan yang menjalankan  company  that  carries  on  business 
kegiatan  usaha  yang  tidak  termasuk  dalam  activities  not  included  in  the 
maksud dan tujuan Perusahaan yang dimuat  Company's  purposes  and  objectives 
dalam anggaran dasarnya; dan  contained  in  its  articles  of  association; 
  and 
   
e.  Mengubah  status  kelembagaan,  maksud,  e.  Changing the institution's status, intent, 
tujuan  atau  kegiatan  usaha  utama  purpose or main business activity. 
Perusahaan. 
   
Perusahaan  diwajibkan  untuk  mempertahankan  The  Company  is  required  to  maintain       
rasio keuangan sebagai berikut:  the following financial ratios: 
a)  current ratio minimal 1 (satu) kali;   a)  current ratio of at least 1 (one) time; 
b)  debt to equity ratio maksimal 3 (tiga) kali; dan  b)  debt  to  equity  ratio  maximum  of  3 
  (three) times; and 
c)  perbandingan  antara  EBITDA  dengan  beban  c)  comparison  between  EBITDA  and 
bunga tidak kurang dari 1,5 (satu koma lima)  interest expense not less than 1.5 (one 
kali.  point five) times. 
   
Pemenuhan  pembatasan  pinjaman  bank  The  fullfilment  of  bank  loan  restriction  will 
dilaporkan  oleh  Perusahaan  setiap  akhir  tahun  be reported by the Company at the end of 
dan akan dievaluasi oleh bank.  the year and will be evaluated by the bank. 
   
Pada  tanggal  30  September  2019  dan  As  of  September  30,  2019  and  December 
31 Desember 2018, saldo pinjaman Perusahaan  31,  2018  the  outstanding  balance  of  
kepada  PT  Sarana  Multi  Insfrastruktur  the  Company's  loans  to  PT  Sarana  
(Persero),  sebesar  Rp  217.268.560.464  dan  Multi  Infrastruktur  (Persero)  
Rp 180.483.519.871.  amounted  to  Rp  217,268,560,464  and  
Rp 180,483,519,871, respectively. 
   
 
 
 
 

149
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Sindikasi Jakarta-Cikampek Elevated II Syndication Bank Loan Jakarta -
Cikampek Elevated II

Berdasarkan Akta Perjanjian Kredit No. 9 tanggal  Based  on  the  Deed  of  Credit  Agreement 


7  Nopember  2018  yang  dibuat  di  hadapan  No. 9 dated November 7, 2018 from Notary 
Notaris  Fathiah  Helmi,  S.H.  beserta  dengan  Fathiah Helmi, S.H. along with the changes 
perubahan-perubahannya  perusahaan  telah  the  Company  has  obtained  a  syndicated 
memperoleh  fasilitas  kredit  sindikasi  dengan  credit facility with  the following conditions: 
ketentuan sebagai berikut: 
   
1.  Fasilitas  Kredit  Tranche  A  sebesar    1.  Tranche  A  Credit  Facility  amounted  to              
Rp  2.750.000.000.000  dari  PT  Bank  Mandiri  Rp  2,750,000,000,000  from  PT  Bank 
(Persero) Tbk, The Bank of Tokyo-Mitsubishi  Mandiri  (Persero)  Tbk,  The  Bank  of 
UFJ, LTd., Cabang Jakarta,  PT Sarana Multi  Tokyo-Mitsubishi  UFJ,  LTd.,  Jakarta 
Infrastruktur (Persero), PT Bank Central Asia  Branch,  PT  Sarana  Multi  Infrastruktur 
Tbk,  PT  Bank  BNP  Paribas  Indonesia,    (Persero),  PT  Bank  Central  Asia  Tbk, 
PT Bank CIMB Niaga Tbk, dan PT Bank KEB  PT  Bank  BNP  Paribas  Indonesia,          
Hana  Indonesia  yang  digunakan  untuk  PT  Bank  CIMB  Niaga  Tbk,  and                      
pembiayaan  modal  kerja  pembangunan  PT  Bank  KEB  Hana  Indonesia  which 
proyek.  are  used  to  finance  working  capital  for 
  project development. 
 
2.  Fasilitas  Kredit  Tranche  B  sebesar    2.  Tranche  B  Credit  Facility  amounted  to       
Rp  340.000.000.000  dari  PT  Bank  Mandiri  Rp  340,000,000,000  from  PT  Bank 
(Persero)  Tbk,  PT  Bank  Central  Asia  Tbk,  Mandiri  (Persero)  Tbk,  PT  Bank 
PT Bank CIMB Niaga Tbk, dan PT Bank KEB  Central Asia Tbk, PT Bank CIMB Niaga 
Hana  Indonesia  yang  digunakan  untuk  Tbk,  and  PT  Bank  KEB  Hana 
pembiayaan Down Payment atau uang muka  Indonesia which are used for financing 
atas  pengadaan  barang  dan  atau  jasa  porsi  Down  Payment  or  advances  for 
Waskita  kepada  KSO  KS-Bukaka  sesuai  procurement of goods and or Waskita's 
dengan Perjanjian JO/KSO KS-Bukaka.  portion  service  to  KSO  KS-Bukaka  in 
accordance  with  the  JO/KSO  KS-
Bukaka Agreement. 
 
3.  Fasilitas  Kredit  Tranche  C  sebesar    3.  Tranche  C  Credit  Facility  amounted  to     
Rp  2.050.000.000.000  dari  PT  Bank  Mandiri  Rp  2,050,000,000,000  from  PT  Bank 
(Persero) Tbk, The Bank of Tokyo-Mitsubishi  Mandiri  (Persero)  Tbk,  The  Bank  of 
UFJ,  LTd.,  Cabang  Jakarta,  dan  PT  Bank  Tokyo-Mitsubishi  UFJ,  LTd.,  Jakarta 
Central  Asia  Tbk  yang  digunakan  untuk  Branch  and  PT  Bank  Central Asia  Tbk 
pembiayaan  supplier  financing  atas  dasar  which  are  used  for  supplier  financing 
akseptasi  invoice  kepada  Perusahaan  financing  on  the  basis  of  invoice 
khusus  pengadaan  barang  dan  atau  jasa  acceptance  to  the  Company 
sesuai Perjanjian JO/KSO KS-Bukaka.  specifically  the  procurement  of  goods 
and  or  services  in  accordance  with  
the JO/KSO KS-Bukaka Agreement. 
   
Perusahaan  memberikan  jaminan-jaminan  The  company  provides  the  following 
sebagai berikut:  guarantees: 
a.  Jaminan Fidusia atas Tagihan;  a.  Fiduciary Guarantee on Bills; 
b.  Jaminan  Fidusia  atas  Hasil  Klaim  Asuransi;  b.  Fiduciary  Guarantee  on  the  Results  of 
dan  Insurance Claims; and 
c.  Perjanjian Pengalihan Hak  c.  Rights Transfer Agreement 
 
Perusahaan  diwajibkan  untuk  mempertahankan  The  company  is  required  to  maintain  a 
debt  (ad.  Interest  bearing  debt)  to  equity  ratio  maximum  debt  (ad.  Interest  bearing  debt) 
maksimum  3  kali,  debt  service  coverage  ratio  to  equity  ratio  3  times,  a  minimum  debt 
minimal  1,00  kali  dan  current  ratio  minimal  1,00  service  coverage  ratio  of  1.00  time  and  a 
kali.  Fasilitas  dapat  digunakan  sampai  dengan  current  ratio  of  at  least  1.00  time.  This 
tanggal 26 Desember 2019.  facility  can  be  used  until  December  26, 
2019. 
   
Per 30 September 2019, seluruh tagihan kepada  As  of September  30, 2019, all amount due 
pengguna  jasa  atas  proyek  Jalan  Tol  Jakarta- from customers of  the Jakarta – Cikampek 
Cikampek  Elevated  II  digunakan  sebagai  Elevated  II  Toll  Road  project  are  used  as 
jaminan (Catatan 5).  collateral (Note 5). 

150
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada  tanggal  30  September  2019  dan  As  of  September  30,  2019  and  December 
31  Desember  2018  saldo  pinjaman  Perusahaan  31,  2018  the  Company's  loan  balances  to 
kepada  PT  Sarana  Multi  Infrastruktur  PT  Sarana  Multi  Infrastrusktur  (Persero) 
(Persero)  sebesar  Rp  291.576.933.456  dan  amounted  to  Rp  291,576,933,456  and 
Rp 212.133.090.910.  Rp 212,133,090,910, respectively. 

b. Bagian Jangka Panjang   b. Long-Term Portion


 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Ketiga/ Third Parties
Entitas anak/ Subsidiary - WSE
PT Indonesia Infrastructure Finance (IIF) 154.840.709.460 160.965.118.242
PT Shalawat Power 821.700.000 821.700.000
Entitas anak/ Subsidiary - WTR
PT Indonesia Infrastructure Finance (IIF)
Kredit Investasi 184.045.655.000 --
Kredit IDC 15.704.345.000 --
Jumlah/ Total 355.412.409.460 161.786.818.242

Entitas anak (kepemilikan tidak langsung)– WSE The subsidiary (indirect ownership) – WSE

  PT Indonesia Infrastructure Finance (IIF)    PT Indonesia Infrastructure Finance (IIF) 
 
Pada  tanggal  8  Maret  2016,  WSE  memperoleh    On  March  8,  2016,  WSE  obtained  a  long-
fasilitas  pinjaman  berjangka  panjang  dari  IIF  term  loan  facility  from  IIF  amounted  to  
sejumlah  Rp  175.000.000.000  yang  terdiri  dari  Rp  175,000,000,000,  which  consists  of 
fasilitas Kredit Investasi (KI) dan Interest During  Investment  Credit  facility  and  Interest 
Construction (IDC) sebesar Rp 10.400.000.000.  During  Construction  (IDC)  facility 
amounted to Rp 10,400,000,000. 
   
Pinjaman  ini  dibayarkan  secara  cicilan  triwulan    The  loan  is  paid  in  quarterly  installments 
sampai dengan bulan Maret 2026 dengan masa  until  March  2026  with  grace  period  of  
tenggang  12  bulan  dimana  pembayaran  cicilan  12  months  which  the  first  installment 
pertama dilakukan setelah 3 bulan setelah masa  payment  is  made  after  3  months  of  the 
tenggang. Fasilitas pinjaman berjangka panjang  grace  period.  This  long-term  loan  facility 
ini  diperoleh  untuk  pembiayaan  proyek  was obtained to finance the construction of 
pembangunan  pembangkit  listrik  tenaga  mini  2X5  MW  mini-hydro  power  plant  with 
hydro 2X5 MW dengan tingkat bunga per tahun  interest  rate  per  annum  of  12.25%.  WSE 
sebesar  12,25%.  WSE  menunjuk  PT Bank  appoints  PT  Bank  Negara  Indonesia 
Negara  Indonesia  (Persero)  Tbk  sebagai  agen  (Persero) Tbk as a security agent. 
jaminan.   
     
Pinjaman tersebut diatas dijamin dengan piutang    The  loan  is  collateralized  with  accounts 
usaha  dan  aset  tetap  termasuk  fasilitas  receivable  and  property  and  equipment 
pembangkit listrik tenaga hidro (infrastruktur).  including  minihydro  power  generating 
facility (infrastructure). 
   
Perjanjian  pinjaman  mencakup  persyaratan    The  loan  agreements  include  certain 
tertentu  yang  mengharuskan  Perusahaan  requirements for the Company to maintain 
mempertahankan  rasio  keuangan  tertentu  yang  certain financial ratios calculated based on 
dihitung  berdasarkan  laporan  keuangan  the  consolidated  financial  statements  and 
konsolidasian dan persyaratan lainnya.  other requirements. 
   
Pada  tanggal  30  September  2019  dan    As  of  September  30, 2019  and  December 
31  Desember  2018  WSE  sudah  31,  2018,  WSE  has  used  Loan  Facility  
memakai  Fasilitas  pinjaman  tersebut  masing  –  amounted  to  Rp  154,840,709,460  and  
masing  sebesar  Rp  154.840.709.460  dan  Rp 160,965,118,242, respectively. 
Rp 160.965.118.242 
     
 
 
 
 
 

151
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
  PT Shalawat Power      PT Shalawat Power 
     
WSE  memperoleh  pinjaman  dari  pihak  berelasi    WSE obtained  a  loan  from  a related  party 
sebesar  Rp  821.700.000  dari  Shalawat  Power  amounted  to  Rp  821,700,000  from 
pada  tanggal  12  Juni  2017  dengan  tingkat  Shalawat  Power  on  June  12,  2017  with 
bunga  variabel  sebesar  10%  per  tahun.  interest  at  variable  rate  10%  per  annum. 
Pinjaman tersebut digunakan untuk pembayaran  The loan used for interest loan payment to 
bunga  pinjaman  kepada  PT  Indonesia  PT  Indonesia  Infrastructure  Finance  (IIF) 
Infrastructure  Finance  (IIF)  yang  akan  jatuh  and will due on June 18, 2020. 
tempo pada tanggal 18 Juni 2020. 
     
Entitas Anak – WTR The Subsidiary – WTR

  PT Indonesia Infrastructure Finance (IIF)    PT Indonesia Infrastructure Finance (IIF) 
 
Berdasarkan  Akta  Notaris  Ariani  Lakhsmijati    Based  on  Notarial  Deed  No.  48  of  Ariani 
Rachim, S.H., No. 48 tanggal 27 Agustus 2018,  Lakhsmijati Rachim S.H., dated August 27, 
PBTR  telah  menandatangani  perjanjian  2018,  PBTR  obtained  Syndicated  credit 
Kredit  Sindikasi  dengan  PT  Bank  Negara  agreement with PT Bank Negara Indonesia 
Indonesia  (Persero)  Tbk,  PT  Bank  Panin  Tbk,  (Persero)  Tbk,  PT  Bank  Panin  Tbk,  
PT  Bank  Papua,  PT  Bank  Pembangunan  PT Bank Papua, PT BPD Sulawesi Selatan 
Daerah  Sulawesi  Selatan  dan  Sulawesi  Barat,  and  Sulawesi  Barat,  PT  Bank  Arta  Graha 
PT Bank Arta Graha Internasional Tbk, PT Bank  Internasional  Tbk,  PT  Bank  Pembangunan 
Pembangunan  Daerah  Maluku  dan  Maluku  Daerah Maluku and Maluku Utara, PT Bank 
Utara,  PT  Bank  Pembangunan  Daerah  Daerah  Pembangunan  Daerah  Daerah  Istimewa 
Istimewa  Yogyakarta,  PT  Bank  Pembangunan  Yogyakarta,  PT  Bank  Pembangunan 
Daerah  Jambi,  PT  Bank  Nagari,  PT  Bank  Daerah  Jambi,  PT  Bank  Nagari,  PT  Bank 
Pembangunan  Daerah  Kalimantan  Tengah,  Pembangunan Daerah Kalimantan Tengah, 
PT  Bank  Pembangunan  Daerah  Bali,  PT  Bank  PT  Bank  Pembangunan  Daerah  Bali,  
Pembangunan  Daerah  Sumatera  Utara,  PT  Bank  Pembangunan  Daerah  Sumatera 
PT  Bank  Pembangunan  Daerah  Jawa  Tengah,  Utara,  PT  Bank  Pembangunan  Daerah 
PT  Bank  Negara  Indonesia  Syariah,  PT  Bank  Jawa  Tengah,  PT  Bank  Negara  Indonesia 
Jabar  Banten  Syariah  dan  PT  Bank  Aceh  Syariah,  PT  Bank  Jabar  Banten  Syariah 
Syariah,  PT  Indonesia  Infrastructure  Finance,  and  PT  Bank  Aceh  Syariah,  PT  Indonesia 
Bank  Riau  Kepri,  Bank  Sumsel  Babel,  PT  Bank  Infrastructure  Finance,  Bank  Riau  Kepri, 
Pembangunan  Daerah  Kalimantan  Selatan,  Bank  Sumsel  Babel,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Sulawesi  Pembangunan Daerah Kalimantan Selatan, 
Tengah,  Bank  DIY  Syariah,  Bank  Riau  Kepri  PT  Bank  Pembangunan  Daerah  Sulawesi  
Syariah,  Bank  Kalsel  Syariah.  Kedua  Puluh  Tengah,  Bank  DIY  Syariah,  Bank    Riau 
Empat bank tersebut memberikan fasilitas kredit  Kepri  Syariah,  Bank  Kalsel  Syariah.  
maksimum sebesar Rp 5.248.541.000.000 yang  These  Twenty  Four  banks  are  providing  
terdiri  dari  kredit  investasi  dan  kredit  bunga  a  credit  facility  with  a  credit  ceiling  
masa  konstruksi  masing-masing  sebesar  of  Rp  5,248,541,000,000  which  
Rp 4.919.070.000.000 dan Rp 329.471.000.000.  consists  of  investment  credit  and  
Kedua  fasilitas  tersebut  diberikan  untuk  interest  during  construction  amounted  
keperluan  pembangunan  Jalan  Tol  Ruas  to  Rp  4,919,070,000,000  and  
Pemalang - Batang.  Rp  329,471,000,000,  respectively.  Both 
facilities  are  provided  for  the  development 
of Pemalang - Batang Toll Road. 
     
Jangka waktu kredit investasi dan kredit interest    The  investment  credit  and  interest  during 
during construction (IDC) adalah 162 bulan atau  construction  credit  term  loan  was  162 
14  tahun  termasuk  masa  tenggang  24  bulan  months  or  14  years  including  a  grace 
atau  2  tahun  sejak  tanggal  efektif.  Suku  bunga  period  of  24  months  or  2  years  from  
yang  dikenakan  adalah  sebesar  10%  per  tahun  the  effective  date.  The  interest  rate  of  this 
yang merupakan rata-rata tertimbang atas dasar  loan  is  10%  p.a  which  represents  
suku  bunga  yaitu  Reference  Rate  (LPS)  the  weighted  average  interest  rate  based 
ditambah dengan Margin.  on the Reference Rate (LPS) plus Margin. 
     
 
 
 
 

152
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pinjaman  tersebut  di  atas  dijamin  dengan    The above loans are collateralized by all of 
seluruh  hak  konsesi  pengusahaan  jalan  tol,  toll  road  concessions  rights,  all  invoices 
seluruh tagihan dan pendapatan operational dari  and  operating  revenues  from  toll  road 
pengelolaan  jalan  tol  dan  usaha  usaha  lain  management  and  other  business  ventures 
terkait  dengan  pengelolaan  jalan  tol,  escrow  related  to  toll  road  management,  escrow 
account,  tagihan  atas  pendapatan  dari  hasil  accounts, claims for income from insurance 
klaim  asuransi,  klaim  bank  garansi,  dan  claims,  bank  guarantee  claims  and 
penggantian dana dari pemerintah, gadai saham  reimbursement  of  funds  from  
milik  pemegang  saham,  serta  company  the  government,  the  shareholders'  pledge 
guarantee  dari  para  pemegang  saham.  of  shares,  and  the  company  guarantee  of  
Perjanjian pinjaman juga mencakup persyaratan  the shareholders. The loan agreement also 
tertentu antara lain: membatasi hak Perusahaan  covers  certain  requirements  such  as: 
untuk  memperoleh  kredit/fasilitas  baru,  limiting  the  Company's  right  to  obtain  new 
mengubah  sususan  pemegang  saham,  credits/  facilities,  changing  shareholder 
melakukan  perubahan  PPJT  dan  atau  business  struture,  making  changes  to  the  PPJT 
plan,  serta  mengharuskan  Perusahaan  untuk  and/or  business  plan.  and  requires  
mempertahankan  rasio  keuangan  tertentu  yang  the  Company  to  maintain  certain  financial 
dihitung  berdasarkan  laporan  keuangan  ratios  calculated  based  on  the  Company 
Perusahaan.  financial statement. 
     
Pembatasan  penting  dalam  perjanjian  pinjaman    Important  covenant  in  the  syndicate  loan 
sindikasi ini adalah:  agreement include the following: 
     
  Debt  to  equity  ratio  (DER)  mencerminkan      Debt  to  equity  ratio  (DER)  reflects  
rasio  pembiayaan  bank  dan  self  financing  the  ratio  of  bank  financing  and  self 
dengan komposisi 70 : 30.  financing  with  the  composition  of 
70:30. 
 
  Current  ratio  (CR)  diluar  bagian  lancar      The  current  ratio  (CR)  excluding 
hutang jangka panjang minimum sebesar 1,0   current  portion  of  long  term  debt 
selama masa operasi.  minimum  of  1.0  times  during  
the operation period. 
 
  Debt  service  coverage  ratio  (DSCR)  lebih      Debt  service  coverage  ratio  (DSCR) 
dari 1,0 kali selama masa operasi.  above  1.0  times  during  the  operation 
period. 
 
  Menjaga ekuitas selalu positif.      Maintain positif balance of equity. 
     
Pada  tanggal  30  September  2019  dan    As  of  September  30,  2019  and  December 
31  Desember  2018  saldo  pinjaman  kredit  31,  2018  the  WTRs  investment  credit  
investasi  WTR  kepada  IIF  masing-masing  loan  balances  to  IIF  amounted  to  
sebesar Rp 184.045.655.000 dan Nihil.  Rp 184,045,655,000 and Nil, respectively. 
     
Pada  tanggal  30  September  2019  dan    As  of  September  30,  2019  and  December 
31  Desember  2018,  saldo  pinjaman  kredit  IDC  31,  2018,  the  WTRs  IDC  credit  
WTR  kepada  IIF  masing-masing  sebesar  loan  balances  to  IIF  amounted  to  
Rp 15.704.345.000 dan Nihil.  Rp 15,704,345,000 and Nil, respectively. 

24. UTANG BRUTO SUBKONTRAKTOR 24. GROSS AMOUNT DUE TO SUBCONTRACTORS 


 
Utang  bruto  subkontraktor  merupakan  utang  kerja    Gross  amount  due  to  subcontractors  represents 
subkontraktor  yang  belum  diberita  acarakan,  baik  dari  payable  for  uncertified  subcontractor’s  working 
subkontraktor  atau  material  yang  diakui  sebagai  progress,  either  from  subcontractor  or  materials 
prestasi  karena  belum  memenuhi  syarat  pembayaran  which  are  recognized  as  progress  but  it  has  not 
sesuai kontrak.  fulfilled  the  certain  payment  condition  as  stated in 
the contract. 
     
 
 
 
 
 

153
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Rincian  utang  bruto  subkontraktor  jangka  pendek  The  details  of  short-term  gross  amount  due  to 
berdasarkan unit kerja adalah sebagai berikut:  subcontractors  based  on  business  units  are  as 
follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Perusahaan/ The Company
Divisi Infrastruktur I / Division Infrastructure I  - Medan 692.072.640.837 --
Divisi Gedung/ Division Building  - Jakarta 484.955.108.599 --
Divisi Infrastruktur II / Division Infrastructure II  - Jakarta 85.731.189.668 --
Divisi EPC/ Division EPC  - Jakarta 70.973.699.311 --
Divisi Infrastruktur III / Division Infrastructure III  - Surabaya 40.249.915.633 --
Divisi/ Division  VI -- 2.092.144.012.492
Divisi/ Division  I -- 1.615.552.478.964
Divisi/ Division  VII -- 1.047.954.085.821
Divisi/ Division  VIII -- 539.711.281.985
Divisi/ Division  III -- 499.128.037.867
Divisi/ Division  II -- 301.708.300.819
Divisi/ Division  IV -- 216.832.284.894
Divisi/ Division  V -- 110.358.841.769
Sub Jumlah/ Sub Total 1.373.982.554.048 6.423.389.324.611
Entitas Anak/ Subsidiary
PT Waskita Beton Precast Tbk (WBP) 378.089.437.020 53.132.173.364
Sub Jumlah/ Sub Total 378.089.437.020 53.132.173.364
Jumlah/ Total 1.752.071.991.068 6.476.521.497.975
 

Rincian utang bruto jangka panjang pihak ketiga adalah  The details of third parties long-term gross amount 
sebagai berikut:  are as follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Perusahaan/ The Company
Divisi Infrastruktur I / Division Infrastructure I  - Medan                  622.367.701.311 --
Divisi Infrastruktur II / Division Infrastructure II  - Jakarta                  472.822.746.048 --
Divisi Gedung/ Division Building  - Jakarta                  227.995.453.841 --
Divisi Infrastruktur III / Division Infrastructure III  - Surabaya                    68.923.616.518 --
Divisi EPC/ Division EPC  - Jakarta                    32.367.880.485 --
Divisi VI/ Division VI  - Palembang -- 714.495.668.947
Divisi V/ Division V  - Jakarta -- 1.030.212.186.382
Divisi III/ Division III  - Jakarta -- 313.519.078.122
Divisi I/ Division I  - Jakarta -- 11.252.983.343
Divisi VII/ Division VII  - Jakarta -- 62.975.574.362
Divisi IV/ Division IV  - Surabaya -- 58.839.723.945
Divisi VIII/ Division VIII  - Jakarta -- 22.999.499.999
Divisi II/ Division II  - Jakarta  -- 10.845.955.699
Jumlah/ Total 1.424.477.398.203 2.225.140.670.799

 
 
25. UANG MUKA KONTRAK JANGKA PENDEK   25. ADVANCES ON SHORT-TERM CONTRACT 
 
Uang  muka  kontrak  jangka  pendek  merupakan  uang  Advances  on  Short-Term  Contract  represents 
muka  pelaksanaan  proyek  yang  diterima  dari  pemberi  advance  received  from  the owners  of  projects  on 
kerja  sesuai  kontrak  pekerjaan  konstruksi  jangka  short-term  construction  contracts;  the advances 
pendek;  uang  muka  tersebut  akan  dikompensasikan  will  be  offset  with  the  progress  of  work  and  terms 
dengan  progress  pekerjaan  dan  termin  pembayaran  of  payment  in  accordance  with  the  progress  of 
sesuai dengan progress lapangan.  work. 
     
 
 
 
 
 
 

154
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Rincian uang muka kontrak jangka pendek berdasarkan    The  details  of  advance  received  based  on 
unit kerja adalah sebagai berikut:  business unit are as follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Perusahaan/ The Company
Divisi Gedung/ Division Building 218.802.321.377 --
Divisi EPC/ Division EPC 15.840.721.796 --
Divisi Infrastruktur III/ Division Infrastructure III 14.981.735.025 --
Divisi Infrastruktur II/ Division Infrastructure II 9.060.993.500 --
Divisi/ Division  I -- 80.618.777.169
Divisi/ Division  Precast -- 17.617.966.900
Divisi/ Division  II -- 9.150.058.249
Divisi/ Division  VIII -- 3.294.177.228
Sub Jumlah/ Sub Total 258.685.771.698 110.680.979.546
Entitas Anak/ Subsidiaries
PT Waskita Karya Realty 21.988.490.607 36.920.760.840
PT Waskita Beton Precast Tbk 11.002.726.336 140.078.289.920
Sub Jumlah/ Sub Total 32.991.216.943 176.999.050.760
Jumlah/ Total 291.676.988.641 287.680.030.306

Uang  muka  kontrak  jangka  pendek  berdasarkan  pihak-   Advance  received  for  short-term  contracts  based 
pihak pemberi kerja sebagai berikut:   on the owner of projects are as follows:  
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
PT Perusahaan Listrik Negara (Persero)  91.807.495.737 --
Lain-lain/ Others  (di bawah/ below  Rp 20 Milyar/ Billion ) 4.646.903.700 10.080.783.551
Sub Jumlah/ Sub Total 96.454.399.437 10.080.783.551
Pihak Ketiga/ Third Parties
Pemerintah Daerah/ District Governments 75.438.645.041 --
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
Ministry of Public Works and Housing 63.450.136.091 --
PT Royal Abadi Dentalindo -- 73.197.759.090
Lain-lain/ Others  (di bawah/ below  Rp 20 Milyar/ Billion ) 56.333.808.072 204.401.487.665
Sub Jumlah/ Sub Total 195.222.589.204 277.599.246.755
Jumlah/ Total 291.676.988.641 287.680.030.306
 
Uang  muka  pada WBP,  entitas  anak,  merupakan  uang    Advances  on  WBP,  a  subsidiary,  represent 
muka  yang  diterima  atas  pesanan  beton  precast  dari  advances  received  on  precast  concrete  orders 
pelanggan.  from customers. 
 
26. BIAYA YANG MASIH HARUS DIBAYAR   26. ACCRUED EXPENSES 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Beban Bunga 385.250.154.600  255.818.229.798 Interest Expenses
Beban Umum 331.001.022.084  322.256.759.716  General Expenses
Beban Kantor 27.790.995.875  105.383.813.987  Office Expenses
Beban Pegawai 10.260.769.298  11.768.016.400  Employee Expenses
Beban Operasional Proyek 183.447.923  559.158.410  Projects Operational Charges
Beban Gedung 194.800.323  --  Building Expenses
Lain-lain 1.188.148.466  --  Others
Jumlah 755.869.338.569 695.785.978.311 Total

 
Biaya  yang  masih  harus  dibayar  dari  operasional    Accrued  expenses  of  operational  projects 
proyek  adalah  utang  kepada  pihak  ketiga  sehubungan  represent  payables  to  third  parties  in  line  with         
dengan  kegiatan  operasional  proyek  Perusahaan,  the project operations of the Company and others 
beban  gedung,  beban  kantor,  beban  pegawai  dan  are  for  building  expenses,  office  expenses, 
beban umum.  employee expense and general expenses. 

155
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada  tanggal  30  September  2019,  beban  bunga  As of September 30, 2019 accrued bonds interest 
obligasi  yang  masih  harus  dibayar  merupakan  beban  expenses  represents  interest  expenses  on       
bunga  atas  obligasi  Perusahaan  yang  belum  dibayar  the  Company’s  bonds  that’s  not  yet  paid  as 
sebagai berikut:  follows: 

Periode  tanggal  17  –  30  September  2019  untuk 


  Period of September 17 – 30, 2019 for bonds 
 
obligasi tahun 2015 Berkelanjutan I Tahap II; year 2015 Shelf I Phase II; 
  Periode  tanggal  10  –  30  September  2019  untuk    Period of September 10 – 30, 2019 for bonds 
obligasi tahun 2016 Berkelanjutan II Tahap I;   year 2016 Shelf II Phase I; 
  Periode  tanggal  10  –  30  September  2019  2019    Period of September 10 – 30, 2019 for bonds 
untuk obligasi tahun 2016 Berkelanjutan II Tahap II;  year 2016 Shelf II Phase II; 
  Periode  tanggal  21  –  30  September  2019  2019    Period of September 21 – 30, 2019 for bonds 
untuk obligasi tahun 2017 Berkelanjutan II Tahap III;   year 2017 Shelf II Phase III; 
  Periode  tanggal  6  –  30  September  2019  untuk    Period  of  September  6  –  30,  2019  for  bonds 
obligasi tahun 2017 Berkelanjutan III Tahap I;  year 2017 Shelf III Phase I; 
  Periode  tanggal  23  –  30  September  2019  untuk    Period of September 23 – 30, 2019 for bonds 
obligasi tahun 2018 Berkelanjutan III Tahap II; dan  year 2018 Shelf III Phase II; and 
  Periode  tanggal  28  –  30  September  2019  untuk    Period of September 28 – 30, 2019 for bonds 
obligasi tahun 2018 Berkelanjutan III Tahap III.  year 2018 Shelf III Phase III. 
   
27. SURAT UTANG JANGKA MENENGAH   27. MEDIUM TERM NOTES
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Surat Utang Jangka Menengah Medium Term Notes
PT. Waskita Toll Road 1.093.262.563.883  844.403.604.859  PT. Waskita Toll Road
PT. Waskita Karya Realty 300.000.000.000  300.000.000.000  PT. Waskita Karya Realty
Biaya Transaksi Diamortisasi (42.384.281.341) (32.199.386.091) Amortized Transaction Cost
Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun (1.050.878.282.542) (812.204.218.768) Less: Short-Term
Jumlah 300.000.000.000 300.000.000.000 Total

PT Waskita Toll Road (WTR)   PT Waskita Toll Road (WTR)


 
PT Waskita Toll Road (WTR) menerbitkan Medium Term    PT  Waskita  Toll  Road  (WTR)  issued  a  Medium 
Notes  (MTN)  berkelanjutan  I  Waskita  Toll  Road  Tahun  Term  Notes  (MTN)  Berkelanjutan  I  Waskita  Toll 
2017  dengan  nilai  hingga  Rp  1.291.975.038.484  Road  Tahun  2017,  which  values  up  to 
dengan  jangka  waktu  370  hari.  Pada  tanggal  Rp  1,291,975,038,484  for  a  period  of  370  days. 
7  Nopember  2017,  diterbitkan  MTN  tahap  I  sebesar  On  November  7,  2017,  MTN  stage  I  amounted  to 
Rp  786.371.433.625,  kemudian  pada  tanggal  2  Maret  Rp 786,371,433,625, then WTR issued MTN stage 
2018  WTR  menerbitkan  MTN  tahap  II  dengan  nilai  II  on  March  2,  2018  amounted  to 
Rp  505.603.604.859  tanpa  bunga  dengan  tingkat  Rp  505,603,604,859  with  zero  coupon  rate  and  at 
diskonto  sebesar  10,43%  per  tahun  dan  akan  jatuh  discount rate of 10.43% per annum and will mature 
tempo pada tanggal 7 Maret 2019.   on March 7, 2019. 
   
WTR  menerbitkan  MTN  berkelanjutan  II  Waskita  Toll  WTR  issued  a  MTN  Berkelanjutan  II  Waskita  Toll 
Road  Tahun  2018  dengan  nilai  hingga  Road  Tahun  2018,  which  values  up  to 
Rp  1.500.000.000.000  dengan  jangka  waktu  370  hari.  Rp  1,500,000,000,000  for  a  period  of  370  days. 
Pada  tanggal  26  September  2018,  diterbitkan  MTN  On September 26, 2018, the Company issued MTN 
tahap I Seri A sebesar Rp 338.800.000.000 tanpa bunga  Tahap  I  Seri  A  amounted  to  Rp  338,800,000,000 
dengan tingkat diskonto sebesar 9,35% per tahun.  with zero coupon rate and at discount rate of 9.35% 
per annum 
   
Pembayaran  pokok  MTN  dilakukan  secara  penuh  pada  Principal  payments  will  be  made  in  full  on                 
saat  tanggal  jatuh  tempo.  Tujuan  penerbitan  MTN  ini  the due date. The purpose of this MTN issuance is 
adalah  untuk  dana  talangan  pembebasan  lahan  untuk  for  bailout  of  land  acquisition  for  toll  sections 
ruas-ruas  tol  yang  dimiliki  Grup  melalui  anak  owned by the Group through subsidiaries including 
Perusahaan  termasuk  namun  tidak  terbatas  pada  but not limited to PT Cimanggis Cibitung Tollways, 
PT Cimanggis  Cibitung  Tollways,  PT  Cinere  Serpong  PT Cinere Serpong Jaya, PT Citra Waspphutowa, 
Jaya,  PT  Citra  Waspphutowa,  PT  Waskita  Bumi  Wira  PT  Waskita  Bumi  Wira  and  PT Cibitung  Tanjung 
dan PT Cibitung Tanjung Priok Port Tollways.  Priok Port Tollways. 
   
PT  Bank  Bukopin  Tbk  bertindak  sebagai  agen  PT Bank Bukopin Tbk act as the monitoring agent. 
pemantau.  Pembayaran  pokok  MTN  dilakukan  melalui  Principal  payments  are  being  paid  as  scheduled 
Kustodian Sentral Efek Indonesia (KSEI) sesuai jadwal.  through Kustodian Sentral Efek Indonesia (KSEI). 

156
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
PT Waskita Karya Realty (WKR)   PT Waskita Karya Realty (WKR)
 
Pada  tanggal  21  Pebruari  2018,  PT  Waskita  Karya  On  February  21,  2018,  PT  Waskita  Karya  Realty 
Realty  (WKR)  menandatangani  kontrak  perjanjian   (WKR)  entered  a  contract  agreement  No.  19  to 
No.  19  untuk  menerbitkan  MTN  dengan  fasilitas  issue  MTN  with  facilities  amounted  to 
pinjaman  sebesar  Rp 300.000.000.000,  dengan  jangka  Rp 300,000,000,000,  with  a  due  date  of  3  years.  
waktu  3 tahun. Fasilitas pinjaman ini diterbitkan melalui  This  loan  facility   issued through Serie A, B, C, 
Seri A, B, C, dan selanjutnya dengan tingkat bunga 10%  and contionued with 10% annual interest rate. This 
per  tahun.  Fasilitas  peminjaman  ini  digunakan  untuk  facility  of  loan  will  be  used  for  working  capital 
modal kerja dan/atau pembayaran kembali utang usaha.      and/or  refinancing  debt.  The  issuance  of  MTN  is 
Penerbitan  MTN  ini  memperoleh  hasil  pemeringkatan  rated  from  PT  Fitch  Ratings  Indonesia  with  BBB- 
dari PT Fitch Ratings Indonesia dengan peringkat BBB-  (idn) rate for WKR.  
(idn) untuk WKR.  
   
Berdasarkan  syarat-syarat  dan  kondisi-kondisi  dari  Under  the  term  and  conditions  of  these  long-term 
perjanjian  sehubungan  dengan  kewajiban  jangka  obligation, WKR are subjects to various covenants 
panjang  tersebut,  WKR  harus  mematuhi  pembatasan  as  follow  as  obtaining  debt  with  new  issuance  of 
antara  lain  memperoleh  pinjaman  dengan  cara  debts  with  other  methods  which  have  a  more 
penerbitan  utang  baru  dengan  cara  lainnya  yang  senior  level  than  MTN  before  issuance  of  MTN, 
mempunyai  batasan  lebih  tinggi  dari  penerbitan  MTN  guarantee  and  make  expense  from  assets  within 
sebelum  adanya  MTN,  menjamin  atau  membebani    50% from total  asset  of  WKR, issued guarantee   
aset    WKR    lebih    besar    dari    50%    dari    total      aset  of      WKR    except      for  business  activity  and 
WKR,  memberikan  jaminan  W  kecuali  untuk  kegiatan   subsidiary operation, mergers and acquisition with 
usaha  dan  anak  WKR,  melakukan  penggabungan,  other  Companys  which  have  a  bad  influence 
pengambilalihan  dengan  WKR  lain  yang  mempunyai  toward business continuity, changing a majority of 
dampak  negatif  terhadap  kelangsungan  usaha,    the composition of  shareholders, sell and  dispose 
merubah     komposisi     pemegang saham mayoritas,  of  fixed  asset  more  than  50%  from  total  asset 
menjual  atau  mengalihkan  aset  tetap    WKR    sebanyak   within 1 current year period, giving another loan to 
lebih    dari    50%    dari  total  aset  dalam  1  tahun  periode  other  third  parties  except  regarding  to  business 
berjalan,  memberikan  pinjaman  kepada  pihak  lain  facilities  development,    employees  loan,  and 
kecuali  berkaitan  dengan  sehubungan  pembangunan  cooperation, changing main business activity, and 
fasilitas  usaha,  pinjaman  karyawan,  dan  koperasi,  reducing  of  authorized,  issued,  and  fully  paid 
mengubah  bentuk  usaha WKR,  dan  mengurangi  modal  capital of WKR:   
dasar, ditempatkan, dan modal dasar WKR:  
   
a.  Pembatasan-pembatasan  atas  pinjaman  a.  Limitations  on  loan  in  accordance  with 
berdasarkan perjanjian No. 19 tahun 2018  agreement No. 19 year 2018 
   
Pada  tanggal  30  September  2019  manajemen  As  of  September  30,  2019  management 
berpendapat  bahwa  WKR  mematuhi  pembatasan  assumed that WKR complies with the covenant 
atas  semua  liabilitas  jangka  panjang.  Manajemen  of  all  long  term  obligations.  The  management 
menyatakan    bahwa    selama    periode  pelaporan  stated that  during  the  reporting period and on 
dan pada tanggal penyelesaian laporan, WKR tidak  the  completion  date    of    financial  report,  WKR 
pernah  mengalami  gagal  bayar  atas  utang  yang  has  never  experience  default  from  maturing 
telah  jatuh  tempo.  Pada  tanggal  30  September  bonds.  As  of  September  30,  2019,  WKR  has 
2019, WKR telah memenuhi semua rasio keuangan  complied  with  all  financial  ratio  required  on 
yang dipersyaratkan dalam perjanjian.  MTN agreements. 
   
b.  Wali Amanat  b.  Trustees 
   
WKR  telah  menunjuk  Wali  Amanat  sebagai  WKR  engaged  Trustees  to  act  as  
perantara  WKR  dengan  pemegang  MTN.  Adapun  the  intermediary  between  WKR  and  MTN 
wali  amanat  untuk  MTN  adalah  PT  Asta  Kapital  holders.  The  Trustees  for  MTN  issuance  is 
Asia.  PT Asta Kapital Asia. 
   
 
 
 
 
 
 
 
 
 
 

157
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
28. UTANG OBLIGASI – BERSIH   28. BOND PAYABLE - NET
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Nominal 14.203.045.843.747  13.861.250.000.000  Face Value
Biaya Emisi Obligasi (19.588.078.192) (21.493.363.957) Bonds Issuance Cost
Akumulasi Amortisasi 8.662.766.794  8.897.505.711  Accumulated Amortization
Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun (747.000.000.000) (1.999.290.340.350) Less: Current Maturity
Jumlah 13.445.120.532.349 11.849.363.801.404 Total

Biaya Emisi Obligasi 19.588.078.192  21.493.363.957  Bonds Issuance Cost


Dikurangi: Akumulasi Amortisasi  (8.662.766.794) (8.897.505.711) Less: Accumulated Amortization
Biaya Emisi Obligasi Unamortized Bond
Belum Diamortisasi 10.925.311.398 12.595.858.246 Issuance Costs

Berdasarkan  Akta  Perjanjian Perwaliamanatan  Obligasi  Based  on  the  Trusteeship  Agreement  Deed  Shelf 
Berkelanjutan  III  Waskita  Karya  Tahap  IV  tahun  2019  Registration Bond III Waskita Karya Phase IV 2019 
No.  53  pada  tanggal  26  April  2019  yang  dibuat  di  No.  53  dated  April  26,  2019  from  Notary  Fathiah 
hadapan Notaris Fathiah Helmi, S.H., Perusahaan telah  Helmi,  S.H.,  the  Company  has  issued  Shelf 
menerbitkan  Obligasi  Berkelanjutan  III  Waskita  Karya  Registration Bond III Waskita Karya Phase IV Year 
Tahap  IV  Tahun  2019  dengan  jumlah  pokok  obligasi  2019  amounted  to  Rp  1,845,750,000,000  which 
sebesar  Rp  1.845.750.000.000  yang  dibagi  dalam  dua  consist of two tranches: 
seri: 
 
  Seri  A  dengan  dengan  tingkat  bunga  tetap  9,00%    Tranche  A  with  fixed  interest  rate  of  9.00% 
per tahun dengan nilai Rp 484.000.000.000.  p.a. with value of Rp 484,000,000,000. 
 
  Seri  B  dengan  dengan  tingkat  bunga  tetap  9,75%    Tranche  B  with  fixed  interest  rate  of  9.75% 
per tahun dengan nilai Rp 1.361.750.000.000.  p.a. with value of Rp 1,361,750,000,000.  
 
Berdasarkan  pemeringkatan  yang  diterbitkan  oleh  Based  on  the  rating  issued  by  
PT Fitch  Rating  Indonesia  tanggal  12  April  2019,  PT  Fitch  Rating  Indonesia  dated  April  12,  2019, 
peringkat  Obligasi  Berkelanjutan  III  Tahap  IV  Waskita  the  Shelf  Registration  Bond  III  Waskita  Karya 
Karya tahun 2019 adalah A-(idn).  Phase IV 2019 are rated as A- (idn). 
   
Berdasarkan  Akta  Perubahan  I  Perjanjian  Based  on  Deed  of  Amendment  I  of  Trustee 
Perwaliamanatan  No.  82  pada  tanggal  26  September  Agreement  No.  82  on  September  26,  2018  from 
2018  yang  dibuat  di  hadapan  Notaris  Fathiah  Helmi,  Notary  Fathiah  Helmi,  SH,  the  Company    
S.H.,  Perusahaan  telah  menerbitkan  Obligasi  has  issued  Shelf  Registration  Bond  III  Waskita 
Berkelanjutan  III  Waskita  Karya  Tahap  III  Tahun  2018  Karya Phase III Year 2018 with a principal amount 
dengan  jumlah  pokok  obligasi  sebesar   of Rp 1,702,750,000,000 divided into two tranches: 
Rp 1.702.750.000.000 yang dibagi dalam dua seri: 
   
  Seri  A  dengan  tingkat  bunga  tetap  9,00%  per  tahun   Tranche A with a fixed interest rate of    9.00% per 
dengan nilai Rp 761.000.000.000.  annum with a value of Rp 761,000,000,000. 
   
  Seri  B  dengan  tingkat  bunga  tetap  9,75%  per  tahun   Tranche  B  with a fixed  interest  rate  of 9.75% per 
dengan nilai Rp 941.750.000.000.  year with a value of Rp 941,750,000,000. 
     
Berdasarkan  Akta  Perjanjian  Perwaliamanatan  No.  12    Based on the Trusteeship Agreement Deed No. 12 
tanggal 6 Pebruari 2018 yang dibuat dihadapan Fathiah  dated  February  6,  2018  from Fathiah  Helmi,  S.H., 
Helmi,  S.H.,  Notaris  di  Jakarta.  Perusahaan  Notary  in  Jakarta.  The  Company  issued  Shelf 
menerbitkan  Obligasi  Berkelanjutan  III  Waskita  Karya  Registration Bond III Waskita Karya Phase II Year 
Tahap  II  Tahun  2018  sebesar  Rp  3.451.500.000.000  2018  amounted  to  Rp  3,451,500,000,000  which 
yang dibagi dalam dua seri:  consists of two tranches: 
  
  Seri A dengan tingkat bunga tetap 7,75% per tahun     Tranche  A  with  fixed  interest  rate  of  7.75%  per 
dengan nilai Rp 1.175.000.000.000.  annum with value of Rp 1,175,000,000,000. 
 
  Seri B dengan tingkat bunga tetap 8,25% per tahun     Tranche  B  with  fixed  interest  rate  of 
dengan nilai Rp 2.276.500.000.000.  8.25%  per  annum  with  value  of              
Rp 2,276,500,000,000.  
     

158
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Berdasarkan  Surat  dari  Otoritas  Jasa  Keuangan  (OJK)  Based  on  Letter  from  Otoritas  Jasa  Keuangan 
ke  Direksi  Perusahaan  No.  S-420/D.04/2017  tanggal   (OJK)  to  Company's  Board  of  Directors  
28  September  2017  Perusahan  efektif  mendaftarkan  No.  S-420/D.04/2017  dated  September  28,  2017.              
Obligasi  Berkelanjutan  III Waskita  Karya  Tahap  II 2018  The  Company  has  effectively  registered    
(Obligasi).  the Waskita Karya Shelf III Phase II 2018 (Bonds). 
     
Kemudian, berdasarkan surat dari DBS Bank ke Dewan  Furthermore,  based  on  letter  from  DBS  
Komisaris  OJK  No.  0071/MGT/DBSVI/II/  2018  tanggal  Bank  to  the  Board  of  Commissioner  OJK  
28  Pebruari  2018  tentang  Laporan  Pasar  Perdana  No.  0071/MGT/DBSVI/II/2018  dated  February  28, 
dalam  Rangka  Penawaran  Umum  Obligasi  2018 regarding the Initial  Public Market Report for                   
Berkelanjutan III Waskita Karya Tahap II 2018 (Obligasi)  the Bond III Waskita Karya Phase II 2018 (Bonds) 
dan  Surat  dari  DBS  Bank  ke  OJK   and Surat  from DBS Bank to OJK No. 0072/MGT/ 
No. 0072/MGT/DBSVI/II/2018 tanggal 28 Pebruari 2018  DBSVI/II/2018  dated  February  28,  2018 
tentang  Laporan  Manager  Penjatahan  dalam  rangka  concerning  the  Allotment  Report  for  Sustained 
Penawaran Umum Berkelanjutan Obligasi Berkelanjutan  Public  Offering  of  Shelf  Registered  Bonds  III 
Obligasi Berkelanjutan III Waskita Karya Tahap II 2018,  Waskita Karya Phase II 2018, the Company Bonds 
Obligasi Perusahaan telah selesai masa penawarannya,  have  been  completed  the  offering  period,  which 
yang dilaksanakan pada tanggal 19 Pebruari 2018, dan  was  held  on  19  February  2018,  allotment  on 
proses  penjatahan  pada  tanggal  21  Pebruari  2018,  February  21,  2018,  and  electronic  bond  
serta  telah  dilaksanakan  distribusi  obligasi  secara  distribution  has  been  executed  on  February  23, 
elektronik  pada  tanggal  23  Pebruari  2018.  Jumlah  2018.  The  amount  of  bond  issued  is 
obligasi  yang  dikeluarkan  adalah  sebesar  Rp 3,451,500,000,000. 
Rp 3.451.500.000.000 
     
Berdasarkan  Akta  Perjanjian  Perwaliamanatan  No.  45    Based on the Trusteeship Agreement Deed No. 45 
tanggal  23  Agustus  2017  yang  dibuat  dihadapan  dated  August  23,  2017  from  Fathiah  Helmi,  S.H., 
Fathiah  Helmi,  S.H.,  Notaris  di  Jakarta.  Perusahaan  Notary  in  Jakarta.  The  Company  issued  Shelf 
menerbitkan  Obligasi  Berkelanjutan  III  Waskita  Karya  Registration  Bond  III  Waskita Karya  Phase  I  Year 
Tahap  I  Tahun  2017  sebesar  Rp  3.000.000.000.000  2017  amounted  to  Rp  3,000,000,000,000  which 
yang dibagi dalam dua seri:  consists of two tranches: 
     
  Seri A dengan tingkat bunga tetap 8,00% per tahun      Tranche  A  with  fixed  interest  rate  of               
dengan nilai Rp 1.369.000.000.000.  8.00%  per  annum  with  value  of 
Rp 1,369,000,000,000. 
     
  Seri B dengan tingkat bunga tetap 8,5% per tahun      Tranche  B  with  fixed  interest  rate  of   
dengan nilai Rp 1.631.000.000.000.  8.5%  per  annum  with  value  of    
Rp 1,631,000,000,000.  
     
Berdasarkan  Akta  Perjanjian  Perwaliamanatan  No.  02    Based on the Trusteeship Agreement Deed No. 02 
tanggal 2 Pebruari 2017 yang dibuat dihadapan Fathiah  dated  February  2,  2017  from Fathiah  Helmi,  S.H., 
Helmi,  S.H.,  Notaris  di  Jakarta.  Perusahaan  Notary  in  Jakarta.  The  Company  issued  Shelf 
menerbitkan  Obligasi  Berkelanjutan  II  Waskita  Karya  Registration Bond II Waskita Karya Phase III Year 
Tahap  III  Tahun  2017  sebesar  Rp  1.657.000.000.000  2017  amounted  to  Rp  1,657,000,000,000  which 
yang dibagi dalam dua seri:  consists of two tranches: 
     
  Seri A dengan tingkat bunga tetap 8,50% per tahun      Tranche  A  with  fixed  interest  rate  of  8.50% 
dengan nilai Rp 747.000.000.000.  per  annum  with  value  of            
Rp 747,000,000,000. 
     
  Seri B dengan tingkat bunga tetap 9,00% per tahun      Tranche  B  with  fixed  interest  rate  of  9.00% 
dengan nilai Rp 910.000.000.000.  per annum with value of Rp 910,000,000,000.  
     
Berdasarkan  Akta  Perjanjian  Perwaliamanatan  No.  55    Based on the Trusteeship Agreement Deed No. 55 
tanggal  9  September  2016  yang  dibuat  dihadapan  dated September 9, 2016 from Fathiah Helmi, S.H. 
Fathiah  Helmi,  S.H.,  Notaris  di  Jakarta.  Perusahaan  The Company has issued Shelf Registration  Bond 
menerbitkan  Obligasi  Berkelanjutan  II  Waskita  Karya  II  Waskita  Karya  Phase  II  Year  2016  with  fixed 
Tahap  II  Tahun  2016,  dengan  tingkat  bunga  tetap  interest  rate  of  8.50%  per  annum  with  value  of  
8,50% per tahun dengan nilai Rp 900.000.000.000.  Rp 900,000,000,000. 
     

159
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Berdasarkan  Akta  Perjanjian  Perwaliamanatan  No.  22    Based on the Trusteeship Agreement Deed No. 22 
tanggal  4  April  2016  yang  dibuat  dihadapan  Fathiah  dated  April  4,  2016  from  Fathiah  Helmi,  S.H.,  
Helmi,  S.H.,  Notaris  di  Jakarta.  Perusahaan  The Company has issued Shelf Registration Bond 
menerbitkan  Obligasi  berkelanjutan  II  Waskita  Karya  II  Waskita  Karya  Phase  I  Year  2016  with  fixed 
Tahap I tahun 2016, dengan tingkat bunga tetap 9,25%  interest  rate  of  9.25%  per  annum  with  value  of  
per tahun dengan nilai Rp 2.000.000.000.000 dan telah  Rp  2,000,000,000,000  and  has  been  paid 
dibayar lunas pada tanggal 31 Mei 2019.  in full on May 31, 2019. 
     
Berdasarkan  Akta  Perjanjian  Perwaliamanatan    Based on the Trusteeship Agreement Deed No. 29 
No.  29  tanggal  29  September  2015  yang  dibuat  di  dated  September  29,  2015  by  notary  Fathiah 
hadapan  Fathiah  Helmi,  S.H.,  Notaris  di  jakarta  Helmi,  S.H.,  Notary  in  jakarta,  the  Company  has 
Perusahaan telah  menerbitkan  Obligasi  Berkelanjutan  I  issued  Shelf  Registration  Bond  I  Waskita  Karya 
Waskita  Karya  Tahap  II  tahun  2015  sebesar   Phase  II  Year  2015  amounted  to  
Rp 1.500.000.000.000 yang dibagi dalam dua seri:  Rp  1,500,000,000,000  which  consist  of  two 
tranches:  
     
  Seri  A  dengan  tingkat  bunga  tetap  11,10%  per      Tranche  A  with  fixed  interest  rate  of       
tahun dengan nilai Rp 1.150.000.000.000.  11.10%  per  annum  with  value  of                
Rp 1,150,000,000,000. 
 
  Seri  B  dengan  tingkat  bunga  tetap  10,40%  per      Tranche B with fixed interest rate of    10.40% 
tahun  dengan  nilai  Rp  350.000.000.000  dan  telah  per annum with value of Rp 350,000,000,000 
dibayar lunas pada tanggal 16 Oktober 2018.  and and has been paid in full on October 16, 
2018.  
     
Berdasarkan  pemeringkatan  yang  diterbitkan  oleh  Based  on  the  ratings  issued  by  PT  Pemeringkat 
PT Pemeringkat  Efek  Indonesia  (Pefindo)  tanggal  Efek  Indonesia  (Pefindo)  dated  March  13,  2019, 
13 Maret  2019,  peringkat  Obligasi  Berkelanjutan  II  the  rating  of  the  Company's  Shelf  II  -  Registered 
Perusahaan  untuk  adalah  idA-  (stable  outlook)  dan  Bonds  is  idA-  (positive  outlook)  and  Based  on    
Berdasarkan  pemeringkatan  yang  diterbitkan  oleh  the  rating  issued by  PT  Fitch Rating  Indonesia  on 
PT Fitch  Rating  Indonesia  tanggal  2  Agustus  2018,  August  2,  2018,  Self  registered  III  Bonds  rating  is 
peringkat Obligasi Berkelanjutan III adalah A-(idn).  A- (idn). 
     
Utang  obligasi  ini  mensyaratkan  Perusahaan  untuk  Bonds  payable  requires  the  Company  to  mantain 
mempertahankan rasio keuangan sebagai berikut:  financial ratios as follows: 
   
  Current  ratio  tidak  kurang  dari  1  :  1  (satu    Current ratio is of not less than 1 : 1 (one is to 
berbanding satu);  one); 
   
  Debt to Equity tidak lebih dari 3 : 1 (tiga berbanding    Debt to Equity is no more than 3 : 1 (three is 
satu); dan  to one); and 
   
  Earning  Before  Interest,  Tax,  Depreciation  and    Earning  Before  Interest,  Tax,  Depreciation 
Amortization  (EBITDA)  dengan  Beban  Bunga  and  Amortization  (EBITDA)  to  Interest 
Pinjaman tidak kurang dari 1,5 : 1 (satu koma lima  Expense  are  not  less  than  1.5  :  1  (one  point 
berbanding satu).  five is to one). 
   
Evaluasi  pemenuhan  atas  persyaratan  rasio  dari  The  evaluation  of  the  fulfillment  of  these 
penerbitan obligasi dilakukan pada setiap akhir tahun.  requirements is held on each year end. 
   
29. LIABILITAS JANGKA PENDEK LAINNYA   29. OTHER SHORT-TERM LIABILITIES 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Jasa Produksi dan Tantiem 55.535.370.057  565.979.031.667  Production Benefits and Tantiem


Kementerian Pekerjaaan Umum dan Perumahan Rakyat 179.730.172.460  179.730.172.460  The Ministry of Public Works and Housing
Iuran Dana Pensiun 10.233.842.424  7.450.905.610  Pension Fund Contribution
Jamsostek 5.541.201.105  5.673.448.791  Jamsostek
Lain-lain 966.835.352.062  66.405.475.230  Others
Jumlah 1.217.875.938.108 825.239.033.758 Total

160
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
   

30. UTANG BANK JANGKA PANJANG


 
30. LONG-TERM BANK LOANS
 
  30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
Perusahaan/ The Company
PT Bank Negara Indonesia (Persero) Tbk 2.571.349.532.576 2.644.000.000.000
Entitas anak/ Subsidiaries
WTR
PT Bank Negara Indonesia (Persero) Tbk
Kredit investasi 3.453.108.346.923 6.111.500.126.769
Kredit IDC 111.435.867.301 106.699.789.831
PT Bank Rakyat Indonesia (Persero) Tbk
Kredit investasi 5.979.681.554.207 5.624.429.058.646
Kredit Dana Talangan Tanah 3.690.798.651.466 --
Kredit IDC 123.627.212.761 116.382.922.643
PT Bank Tabungan Negara Indonesia (Persero) Tbk
Kredit investasi 220.042.926.255 94.580.673.879
PT Bank BNI Syariah
Kredit Investasi 241.223.825.001 --
PT Bank BRIsyariah Tbk
Kredit Investasi 17.082.743.827 --
WKR
PT Bank Tabungan Negara (Persero) Tbk 510.473.000.000 460.000.000.000
Sub Jumlah/ Sub Total 16.918.823.660.317 15.157.592.571.768
Pihak Ketiga/ Third Parties
Perusahaan/ The Company
Sindikasi Modal Kerja/ Working Capital Syndication
PT Bank BTPN Tbk (d/h /formerly PT Bank Sumitomo Mitsui Indonesia) 1.102.500.000.000 1.102.500.000.000
Bank of China Ltd 1.102.500.000.000 1.102.500.000.000
PT Bank KEB Hana Indonesia 450.000.000.000 450.000.000.000
PT Bank Permata Tbk 450.000.000.000 450.000.000.000
PT Bank OCBC NISP Tbk 446.638.390.058 450.000.000.000
PT Bank China Construction Bank Indonesia Tbk 360.000.000.000 360.000.000.000
PT Bank CTBC Indonesia 270.000.000.000 270.000.000.000
PT Shinhan Bank Indonesia 180.000.000.000 180.000.000.000
PT Bank SBI Indonesia 135.000.000.000 135.000.000.000
Sindikasi Modal Kerja/ Working Capital Syndication
PT Bank BTPN Tbk (d/h /formerly PT Bank Sumitomo Mitsui Indonesia) 1.000.000.000.000 277.800.000.000
PT Bank Permata Tbk 500.000.000.000 138.900.000.000
PT Bank Resona Perdania Indonesia 200.000.000.000 55.500.000.000
PT Shinhan Bank Indonesia 150.000.000.000 27.800.000.000
Bank QNB Indonesia 500.000.000.000 --
PT CIMB Niaga Tbk - Unit Usaha/ Business Unit  Syariah 500.000.000.000 --
Entitas anak/ Subsidiaries
WTR
PT CIMB Niaga Tbk - Unit Usaha/ Business Unit  Syariah
Kredit Investasi 473.899.980.196 --
PT Bank Pembangunan Daerah Kalimantan Timur dan Kalimantan Utara
 - Unit Usaha/ Business Unit Syariah
Kredit Investasi 22.776.991.769 --
PT Bank Panin Dubai Syariah Tbk
Kredit Investasi 320.516.448.169 --
Kredit IDC 1.033.404.031
PT Bank Sumsel Babel - Unit Usaha/ Business Unit  Syariah
Kredit Investasi 5.694.247.942 --
PT Bank Aceh Syariah
Kredit Investasi 391.369.625.285 --
PT Bank Pembangunan Daerah Riau Kepri - Unit Usaha/ Business Unit  Syariah
Kredit Investasi 73.387.418.933 --
PT Bank Bank Pembangunan Daerah DIY - Unit Usaha/ Business  Unit  Syariah
Kredit Investasi 48.917.881.910 --
PT Bank Pembangunan Daerah Jabar dan Banten 
- Unit Usaha/ Business Unit Syariah
Kredit Investasi 52.334.009.131 --
PT Bank Pembangunan Daerah Jawa Timur - Unit Usaha/ Business Unit  Syariah
Kredit Investasi 90.371.825.918 --
PT Bank Pembangunan Daerah Kalimantan Barat
   Kredit Investasi 171.699.000.000 171.699.000.000
   Kredit IDC 9.394.796.953 --
PT Bank Kalimantan Selatan - Unit Usaha/ Business Unit  Syariah
Kredit Investasi 54.619.193.897 --
PT Bank Aceh
Kredit Investasi 34.783.586.309  

161
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
  30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
PT Bank Pembangunan Daerah Sumatera Utara
   Kredit Investasi 138.034.241.250 --
   Kredit IDC 11.778.258.750 --
PT Bank Pembangunan Daerah Sumatera Barat
   Kredit Investasi 15.800.599.746 --
   Kredit IDC 956.946.859 --
PT Bank Pembangunan Daerah Jambi
   Kredit Investasi 138.034.241.250 --
   Kredit IDC 11.778.258.750 --
PT Bank Pembangunan Daerah Bengkulu
   Kredit Investasi 78.983.330.033 --
   Kredit IDC 3.298.670.337 --
PT Bank Pembangunan Daerah DIY
   Kredit Investasi 46.011.413.750 --
   Kredit IDC 3.926.086.250 --
PT Bank Pembangunan Daerah Bali
   Kredit Investasi 155.900.251.156 --
   Kredit IDC 9.729.294.689 --
PT Bank Pembangunan Daerah Kalimantan Tengah
   Kredit Investasi 138.034.241.250 --
   Kredit IDC 11.778.258.750 --
PT Bank Kalimantan Timur dan Kalimantan Utara
   Kredit Investasi 7.900.299.873 --
   Kredit IDC 478.473.431 --
PT Bank Pembangunan Daerah Kalimantan Selatan
   Kredit Investasi 224.917.871.156 --
   Kredit IDC 15.566.693.363 --
PT Bank Pembangunan Daerah Sulawesi Tengah
   Kredit Investasi 46.011.413.750 --
   Kredit IDC 3.926.086.250 --
PT Bank Pembangunan Daerah Sulawesi Selatan dan Sulawesi Barat
   Kredit Investasi 69.016.621.250 --
   Kredit IDC 5.889.628.750 --
PT Bank Pembangunan Daerah Sumatera Selatan dan Bangka Belitung
   Kredit Investasi 345.199.852.500 171.699.000.000
   Kredit IDC 24.199.268.203 --
PT Bank Pembangunan Daerah Riau dan Kepulauan Riau
   Kredit Investasi 335.824.862.500 128.774.000.000
   Kredit IDC 24.713.971.538 --
PT Bank Pembangunan Daerah Papua
   Kredit Investasi 507.851.024.873 85.849.000.000
   Kredit IDC 40.574.141.724 --
PT Bank Pembangunan Daerah Maluku dan Maluku Utara
   Kredit Investasi 107.738.638.655 55.802.000.000
   Kredit IDC 7.380.887.622 --
PT Bank Pembangunan Daerah Nusa Tenggara Timur
   Kredit Investasi 173.767.259.811 42.925.000.000
   Kredit IDC 6.168.100.590 --
PT Bank Pembangunan Daerah Jawa Timur
   Kredit investasi 627.543.496.899                  354.413.305.370
   Kredit IDC 29.751.674.887 --
PT Bank Nagari
   Kredit investasi 184.044.656.250 --
   Kredit IDC 15.705.343.750 --
PT Bank Pan Indonesia Tbk
   Kredit investasi 468.957.110.980 --
   Kredit IDC 28.998.444.621 --
PT Bank Artha Graha International Tbk
   Kredit investasi 138.034.241.250 --
   Kredit IDC 11.778.258.750 --
PT Bank Pembangunan Daerah Jawa Tengah
   Kredit investasi 237.957.368.623 --
   Kredit IDC 20.171.426.852 --
Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun/
Less: Current Maturity (416.500.000.000)                 (416.500.000.000)
Sub Jumlah/ Sub Total 13.155.048.012.022 5.594.661.305.370
Jumlah 30.073.871.672.339 20.752.253.877.138

 
 

162
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pihak Berelasi   Related Parties
Perusahaan   The Company
 
1. PT Bank Negara Indonesia (Persero) Tbk 1. PT Bank Negara Indonesia (Persero) Tbk
 
Perusahaan  memperoleh  fasilitas  kredit  dari     The Company obtained credit facilities from PT 
PT  Bank  Negara  Indonesia  (Persero)  Tbk  sebagai  Bank  Negara  Indonesia  (Persero)  Tbk  as 
berikut:  follows: 
     
a.  Kredit  Modal  Kerja  (KMK)  Revolving    a.  Revolving  Working  Capital  Loan  (WCL)  of  
Rp 200.000.000.000. Rp 200,000,000,000. 
b.  Kredit  Modal  Transaksional    b.  Transactional  Capital  Loan  of  
Rp 4.450.000.000.000.  Rp 4,450,000,000,000. 
c.  Kredit  Modal  Kerja  Supply  Chain  Financing    c.  Supply  Chain  Financing  (SCF)  Working 
(SCF) Rp 2.775.000.000.000.  Capital Loan of Rp 2,775,000,000,000. 
d.  Bank Garansi Rp 1.105.000.000.000.    d.  Bank Guarantee of Rp 1,105,000,000,000. 
e.  Letter  of  Credit  (L/C)  atau  SKBDN  sebesar    e.  Letter  of  Credit  (L/C)  or  SKBDN  of  
Rp 240.000.000.000.  Rp 240,000,000,000. 
 
Berdasarkan  surat  No.  BIN/2.2/120/R  tanggal   According  to  letter  No.  BIN/2.2/120/R  dated 
18  Maret  2019,  jangka  waktu  pinjaman  sejak  March  18,  2019,  the  term  of  loan  since  date  
tanggal  27  Maret  2019  dan  jatuh  tempo  26  Maret  March 27, 2019 will be due on March 26, 2020 
2020  dan  surat  No.  BIN/2.2/261/R  tanggal   and  letter  No.  BIN/2.2/261/R  dated  September 
25 September 2019 perihal Persetujuan Tambahan  25,  2019  related  to  Agreement  of  Additional 
Fasilitas  Kredit  Modal  Kerja  Bridging  yang  berlaku  Transactional  Working  Capital  Credit  Bridging 
sampai  dengan  30  Nopember  2020.  Fasilitas  Facilities  which  are  valid  until  November  30, 
pinjaman ini dijamin dan diikat dengan: 2020.  The  loan  facilities  are  secured  and 
bounded with:
   
a.  Persediaan yang telah diikat akta fidusia No. 5  a.  Inventory  which  has  been  tied  by  fiduciary 
tanggal 13 Agustus 1998 dan telah didaftarkan  deed  No. 5  dated  August  13,  1998  and  
di  Kantor  Pendaftaran  Fidusia;  Sertifikat  was registered at the Fiduciary Registration 
Jaminan  Fidusia  No.  C2-4831  HT.04.06.  Office;  the  Fiduciary  Certificate  
TH.2001/NTSD  tanggal  26 Januari  2001  No.  C2-4831  HT.04.06.TH.  2001/NTSD 
senilai Rp 8.268.049.363 (Catatan 9). dated  January 26,  2001  amounted  to 
Rp 8,268,049,363 (Note 9).
   
b.  Satu bidang tanah dengan Sertifikat Hak Guna  b.  A  plot  of  land  with  land  right  (SHGB)  
Bangunan  (SHGB)  No.  724  tanggal  29 Maret  No.  724  dated  March  29,  1988  until 
1988 sampai dengan 1 Desember 2027 seluas  December  1,  2027,  an  area  of           
2.098m2  terletak  di  Kelurahan  Cipinang  2,098sqm  located  at  Kelurahan  Cipinang 
Cempedak,  Kecamatan  Jatinegara,  Jakarta  Cempedak,  Districts  Jatinegara,  East 
Timur,  atas  nama  Perusahaan  senilai   Jakarta    on  behalf  of  the  Company 
Rp  1.500.000.000  sesuai  dengan  SHT  amounted    to  Rp 1,500,000,000  according          
No. 397/T/1988,  senilai  Rp  31.000.000.000  to  SHT  No.  397 / T / 1988,  amounted   to 
sesuai    dengan   SHT. II    No.    408 / 2004  Rp 31,000,000,000  according  to  SHT.II 
(Catatan 16).  Senilai  Rp  48.320.400.000  No. 408/2004  (Note  16).  Amounted  to 
sesuai  dengan  SHT  III  No. 06386/2014  dan  Rp 48,320,400,000  according  to  SHT  III 
senilai  Rp 11.120.940.000  dimana  SHT  IV  No. 06386/2014  and  Rp  11,120,940,000 
sedang dalam proses.  while SHT IV is still in process. 
   
c.  Satu  bidang  tanah  dengan  SHGB  No.  38,  c.  A  plot  of  land  with  SHGB  No. 38,  dated 
tanggal 21 April 2003 sampai dengan 20 April  April 21, 2003 until April 20, 2022, an area 
2022,  seluas  1.332  m2,  terletak  di  Jl.  Langko  of  1,332sqm,  located  at  Jl. Langko 
Kelurahan  Ampenan  Selatan,  Kecamatan  Kelurahan  Ampenan  Selatan,  Kecamatan 
Ampenan,  Mataram,  Nusa  Tenggara  Barat,  Ampenan,  Mataram,  West  Nusa 
atas  nama  Perusahaan  Cabang  NTB  senilai  Tenggara, on behalf of the Company NTB 
Rp 1.332.000.000  sesuai  dengan  SHT.I  Branch  amounted  to  Rp 1,332,000,000 
No. 687/2007  (Catatan  16)  dan  senilai  according  to  SHT.I  No. 687/2007  (Note 
Rp 1.860.010.000  dimana  SHT  II  sedang  16)  and  amounted  Rp 1,860,010,000 
dalam proses. while SHT II still in process.
 

163
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
d.  Satu  bidang  tanah  dengan  SHGB  No.  2001  d.  A plot of  land with SHGB No. 2001 dated 
tanggal  1  Juni  2006  sampai  dengan  tanggal   June 1, 2006 until on January 1, 2026, an 
1  Januari  2026,  seluas  5.798m2,  terletak  di  area  of  5,798sqm,  located  at  Kelurahan 
Kelurahan Kuta Alam, Banda Aceh, Aceh, atas  Kuta  Alam,  Banda  Aceh,  Aceh,  on  behalf 
nama  Perusahaan  senilai  Rp 5.191.600.000  of  the  Company  amounted  to 
sesuai  dengan  SHT  I  No. 323  (Catatan 16)  Rp 5,191,600,000  according  to  SHT  I  
dan  senilai  Rp 9.779.660.000  sesuai  SHT  II  No.  323  (Note  16)  and  amounted 
No. 1375/2015. Rp 9,779,660,000  according  to  SHT  II 
No. 1375/2015.
 
e.  Satu  bidang  tanah  dengan  SHGB  No.  4  e.  A  plot  of  land  with  SHGB  No.  4  dated 
tanggal  10 Nopember  1998  sampai  dengan  November  10,  1998  until  December 19, 
19 Desember 2028 seluas 2.511m2, terletak di  2028  an  area  of  2,511sqm,  located  at 
Desa/Kelurahan  Betung-Tebal,  Kecamatan  Desa/Kelurahan  Betung-Tebal,  Districts 
Lubuk-Begalung,  Padang,  Sumatera  Barat,  Lubuk-Begalung,  Padang,  West 
atas  nama  Perusahaan  senilai  Sumatera,  on  behalf  of  the  Company 
Rp 651.430.000  (Catatan  16)  dan  senilai  amounted  to  Rp 651,430,000  (Note  16) 
Rp 6.321.020.000  dimana  SHT  II  sedang  and  amounted  Rp 6,321,020,000  while 
dalam proses. SHT II still in process.
   
f.  Satu  bidang  tanah  dengan  SHGB  No.  7  f.  A  plot  of  land  with  SHGB  No.  7  dated 
tanggal  10 Pebruari  1993  sampai  dengan   February 10, 1993 until February 7, 2013, 
7  Pebruari  2013  seluas  806m2,  terletak  di  an  area  of  806sqm,  located  at  Kelurahan 
Kelurahan  Belakanolo,  Kecamatan  Padang  Belakanolo,  Districts  West  Padang, 
Barat,  Padang,  Sumatera  Barat,  atas  nama   Padang,  West  Sumatera,  on  behalf  of  
Perusahaan  senilai  Rp  1.270.880.000  sesuai  the  Company  amounted  to 
dengan  SHT  I  No.  3129/2001,                        Rp 1,270,880,000  according  to  SHT  I 
senilai  Rp 460.020.000  sesuai  dengan   No. 3129/2001,  amounted  to 
SHT II No. 1151/2007. SHGB   tersebut   telah  Rp 460,020,000   according    to  SHT   II 
diperpanjang sampai dengan 7 Pebruari 2033  No.  1151/2007.  The  land  right  (SHGB) 
dan  senilai  Rp  3.474.910.000  sesuai  SHT  III  has been extended until February 7, 2033 
No. 1846/2016 (Catatan 16).  and  amounted  to  Rp  3,474,910,000 
according  to  SHT  III  No  1846/2016  
(Note 16). 
 
g.  Satu  bidang  tanah  dengan  SHGB  No.  436  g.  A  plot  of  land  with  SHGB  No. 436  dated 
tanggal 10 Maret 1998 sampai dengan 19 Juni  March  10,  1998  until  June 19,  2032,  an 
2032, seluas 1.004m2, terletak di Desa Sungai  area of 1,004sqm, located at Desa Sungai 
Raya,  Kodya  Pontianak,  Kalimantan  Barat,  Raya,  Pontianak,  West  Kalimantan,  on 
atas  nama  Perusahaan  senilai  behalf  of  the  Company  amounted  to 
Rp 464.850.000  sesuai  dengan  SHT  I  Rp 464,850,000  according  to  SHT  I 
No. 356/2001,  senilai  Rp 747.850.000  sesuai  No. 356/2001,  amounted  to 
dengan  SHT  II  No. 169/2007  dan  senilai   Rp 747,850,000  according  to  SHT  II 
Rp  3.595.942.000  sesuai  dengan  SHT  III   No. 169/2007,  and  amounted  to 
No. 36/2016 (Catatan 16). Rp 3,595,942,000  according  to  SHT  III 
No. 36/2016 (Note 16). 
   
h.  Satu  bidang  tanah  dengan  SHGB  No.  1085  h.  A  plot  of  land  with  SHGB  No. 1085 dated 
tanggal  18 Desember  2006  sampai  dengan  December  18,  2006  until  November  23, 
23 Nopember  2026,  seluas  1.404m2,  terletak  2026,  an  area  of  1,404sqm,  located  at 
di  Kelurahan  Jemur  Wonosari,  Kecamatan  Kelurahan  Jemur  Wonosari,  Kecamatan 
Wonocolo,  Surabaya,  Jawa  Timur,  atas nama  Wonocolo,  Surabaya,  East  Java,  on 
Perusahaan  senilai  Rp  2.665.700.000  sesuai  behalf  of  the  Company  amounted  to 
dengan  SHT  I  No. 2952/2007  dan  senilai  Rp 2,665,700,000  according  to  SHT  I 
Rp 3.595.940.000  sesuai  SHT  III  No. 2952/2007  and  amounted  
No. 00621/2016  tanggal  28  Januari  2016  Rp  3,595,940,000  according  to  SHT  III 
(Catatan 16). No. 00621/2016  dated  January  28,  2016 
(Note 16). 

164
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
i.  Satu  bidang  tanah  dengan  SHGB  No.  82  i.  A  plot  of  land  with  SHGB  No. 82  dated 
tanggal  20 Oktober  1988  sampai  dengan   October  20,  1988  to  April  13,  2028,  an 
13  April  2028,  seluas  2.013m2,  terletak  di  area  of  2,013sqm,  located  at  Kelurahan 
Kelurahan  Kalirungkut,  Kota  Surabaya,  Jawa  Kalirungkut,  Surabaya,  East  Java,  on 
Timur,  atas  nama  Perusahaan  senilai  behalf  of  the  Company  amounted  to 
Rp 2.027.710.000  sesuai  dengan  SHT  I  Rp 2,027,710,000  according  to  SHT  I 
No. 4772/2001,  senilai  Rp  2.474.390.000  No. 4772/2001,  amounted  to 
sesuai  dengan  SHT  II  No.  2948/2007  dan  Rp 2,474,390,000  according  to  SHT  II 
senilai  Rp  10.571.030.000  dimana  SHT  III  No. 2948/2007  and  amounted  to 
sedang dalam proses (Catatan 16). Rp 10,571,030,000  while  SHT  III  still  in 
process (Note 16).  

j.  Satu  bidang  tanah  dengan  SHGB  No.  2  j.  A  plot  of  land  with  SHGB  No.  2  dated 
tanggal  25 Juni  1997  sampai  dengan  25  Juni  June  25,  1997  until  June  25,  2017,  an 
2017,  seluas  1.000m2,  terletak  di  Kelurahan  area  of  1,000sqm,  located  at  Kelurahan 
Pasir  Panjang,  Kecamatan  Kelapa  Lima,  Pasir  Panjang,  Kecamatan  Kelapa  Lima, 
Kupang,  Nusa  Tenggara  Timur,  atas  nama  Kupang,  East  Nusa  Tenggara,  on  behalf 
Perusahaan  senilai  Rp 402.860.000  sesuai  of  the  Company  amounted  to 
dengan  SHT  I  No. 390/2001  dan  senilai  Rp 402,860,000  according  to  SHT  I 
Rp 636.540.000  sesuai  dengan  SHT  II  No. 390/2001  and  amount  to 
No. 239/2007 senilai Rp 3.085.070.000 sesuai  Rp 636,540,000  according  to  SHT  II 
dengan SHT III No. 1387/2015 (Catatan 16). No. 239/2007  amounted  to 
Rp 3,085,070,000  according  to  SHT  III 
No. 1387/2015 (Note 16).

k.  Satu  bidang  tanah  dengan  SHGB  No.  24  k.  A  plot  of  land  with  SHGB  No.  24  dated 
tanggal  24 Oktober  1997  sampai  dengan   October 24,  1997  until  October  24,  2017, 
24  Oktober  2017,  seluas  595m2,  terletak  di  an  area  of  595sqm,  located  at  Kelurahan 
Kelurahan  Oesapa,  Kecamatan  Kelapa  Lima,  Oesapa,  Districts  Kelapa  Lima,  Kupang, 
Kupang,  Nusa  Tenggara  Timur,  atas  nama  East  Nusa  Tenggara,  on  behalf  of  
Perusahaan  senilai  Rp 49.260.000  sesuai  the Company amounted to Rp 49,260,000 
dengan  SHT  I  No. 374/2001  dan  senilai  according  to  SHT  I  No. 374/2001  and 
Rp 39.740.000  sesuai  dengan  SHT  II  amounted  to  Rp 39,740,000  according  to 
No. 240/2007 (Catatan 16). SHT II No. 240/2007 (Note 16).

l.  Satu  bidang  tanah  dengan  SHGB  No.  13  l.  A  plot  of  land  with  SHGB  No. 13  dated 
tanggal  22 Juli  1993  sampai  dengan  22  Juli  July 22, 1993 until July 22, 2023, an area 
2023,  seluas  4.830m2,  terletak  di  Jl.  Eltari  II  of  4,830sqm,  located  at  Jl.  Eltari  II, 
Kecamatan  Kupang  Tengah,  Kupang,  Nusa  Kecamatan  Kupang  Tengah,  Kupang, 
Tenggara  Timur,  atas  nama  Perusahaan  East  Nusa  Tenggara,  on  behalf  of  
senilai  Rp 457.590.000  sesuai  dengan  SHT  I  the  Company  amounted  to 
No. 375/2001 (Catatan 16).  Rp 457,590,000  according  to  SHT  I 
No. 375/2001 (Note 16). 
   
m.  Satu  bidang  tanah  dengan  SHGB  No.  14  m.  A  plot  of  land  with  SHGB  No. 14  dated 
tanggal  22 Juli  1993  sampai  dengan  22  April  July 22, 1993 until April 22, 2023, an area 
2023,  seluas  4.800m2,  terletak  di  Jl.  Eltari  II  of  4,800sqm,  located  at  Jl.  Eltari  II, 
Kecamatan  Kupang  Tengah,  Kupang,  Nusa  Kecamatan  Kupang  Tengah,  Kupang, 
Tenggara  Timur,  atas  nama  Perusahaan  East  Nusa  Tenggara,  on  behalf  of  
senilai  Rp 288.000.000  sesuai  dengan  SHT  I  the  Company  amounted  to 
No.  375/2001,  senilai  Rp 602.410.000  sesuai  Rp 288,000,000  according  to  SHT  I 
dengan  SHT  II  No. 238/2007  dan  senilai  No. 375/2001,  amounted  to 
Rp 7.828.880.000  dimana  SHT  III  sedang  Rp 602,410,000  according  to  SHT  II 
dalam proses (Catatan 16).  No. 238/2007  and  amounted 
Rp 7,828,880,000  while  SHT  III  still  in 
process (Note 16). 
   

165
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
n.  Satu  bidang  tanah  dengan  SHGB  No.  24  n.  A  plot  of  land  with  SHGB  No.  24  dated 
tanggal  11  Juni  1993  sampai  dengan  25  Mei  June 11, 1993 until May 25, 2013, an area 
2013,  seluas  276m2,  terletak  di  Kelurahan  of  276sqm,  located  at  Kelurahan  Tikala 
Tikala  Ares,  Kecamatan  Wenang,  Manado,  Ares,  Districts  Wenang,  Manado,  North 
Sulawesi Utara, atas nama Perusahaan senilai  Sulawesi,  on  behalf  of        the  Company 
Rp 263.530.000,  sesuai  dengan  SHT  I  amounted to Rp 263,530,000 according to 
No. 737/2001  dan  senilai  Rp  121.670.000,  SHT  I  No. 737/2001  and  amounted  to 
sesuai  dengan  SHT  II  No.  667/2007.  SHGB  Rp 121,670,000  according  to  SHT  II 
tersebut  telah  diperpanjang  sampai  dengan  No. 667/2007.  The  land  right  (SHGB)  has 
25 Mei 2033 (Catatan 16).  been  extended  until  May  25,  2033  (Note 
16). 
   
o.  Satu  bidang  tanah  dengan  SHGB  No.  1  o.  A  plot  of  land  with  SHGB  No.  1  dated 
tanggal  7  Januari  1992  sampai  dengan   January 7, 1992 until December 28, 2020, 
28  Desember  2020,  seluas  4.040m2,  terletak  an  area  of  4,040sqm,  located  at  Desa 
di  Desa  Cileunyi  Wetan,  Kecamatan  Cileunyi,  Cileunyi  Wetan,  Kecamatan  Cileunyi, 
Kabupaten  Bandung,  Jawa  Barat,  atas  nama  Kabupaten  Bandung,  West  Java,  on 
Perusahaan  senilai  Rp 1.516.520.000,  sesuai  behalf  of  the  Company  amounted  to 
dengan  SHT  I  No. 2927/2001,  senilai  Rp 1,516,520,000  according  to  SHT  I 
Rp 994.180.000  sesuai  dengan  SHT  II  No. 2927/2001,  amounted  to 
No. 1613/2007  dan  senilai  Rp 3.182.880.000  Rp 994,180,000  according  to  SHT  II 
sesuai dengan SHT III No. 10710/2015. Tanah  No. 1613/2007  and  amounted  to 
yang  dijaminkan  termasuk  bangunan  dan  Rp 3,182,880,000  according  to  SHT  III 
segala  sesuatu  yang  berada  diatas  tanah  No.  10710/2015.  Land  pledged  as 
tersebut  baik  yang  telah  ada  maupun  yang  collateral consists of buildings and related 
akan ada (Catatan 16).  things  already  existing  in  the  land,  or  will 
exist there (Note 16). 
   
p.  Satu  bidang  tanah  dengan  SHGB  No.  30  p.  A  plot  of  land  with  SHGB  No. 30  dated 
tanggal  26 Januari  2007  sampai  dengan   January  26,  2007  until  January  26,  2027, 
26  Januari  2027,  seluas  1.250m2,  terletak  di  an  area  of  1,250sqm,  located  at 
Kelurahan  Sumerta,  Kecamatan  Denpasar  Kelurahan Sumerta, Kecamatan Denpasar 
Timur,  Bali,  atas  nama  Perusahaan  senilai  Timur,  Bali,  on  behalf  of  the  Company 
Rp 3.404.000.000  sesuai  dengan  SHT  I  amounted  to  Rp 3,404,000,000  according 
No. 2012/2007  senilai  Rp 18.705.400.000  to  SHT  I  No. 2012/2007  amounted  to 
dimana  SHT  II  sedang  dalam  proses.  Tanah  Rp 18,705,400,000  while  SHT  II  still  in 
yang  dijaminkan  termasuk  bangunan  dan  process.  Land  pledged  as  collateral 
segala  sesuatu  yang  berada  di  atas  tanah  consist  of  buildings  and  related  things 
tersebut,  baik  yang  telah  ada  maupun  yang  already  existing  in  the  land,  or  to  will  be 
akan ada (Catatan 16).  exist there (Note 16). 
   
q.  Satu  bidang  tanah  dengan  SHGB  No.  01  q.  A  plot  of  land  with  SHGB  No.  01  dated 
tanggal  13  Nopember  1987  sampai  dengan  November  13,  1987  until  October  13, 
13 Oktober  2027,  seluas  1.905m2,  terletak  di   2027, an area of 1,905 sqm, located at Jl. 
Jl.  P.  Antasari  No. 1/4,  Tanjung  Baru,  Bandar  P. Antasari No. 1/4, Tanjung Baru, Bandar 
Lampung  atas  nama  Perusahaan  senilai  Lampung,  on  behalf  of  the  Company 
Rp 30.000.000 sesuai dengan S. Hip No. 3181  amounted  to  Rp 30,000,000  according  to 
tanggal  13  September  1989,  senilai  S.  Hip  No. 3181  dated  September  13, 
Rp 2.222.100.000  sesuai  dengan  SHT  II  1989,  amounted  to  Rp 2,222,100,000 
No. 01057/2007 dan senilai Rp 3.642.670.000  according  to  SHT  II  No. 01057/2007  and 
sesuai  dengan  SHT  III  No.  02119/2016.  amounted  to  Rp 3,642,670,000  according 
(Catatan 16).  to SHT III No. 02119/2016 (Note 16). 
 
r.  Kendaraan  bermotor  yang  terdiri  dari  1  (satu)  r.  Vehicles  consisting  of  1  (one)  unit  VW 
unit VW Caravelle 2.0 tahun 2012, yang diikat  Caravelle  2.0  year  2012  tied  by  fiduciary 
fidusia  sesuai  Akta  Pemberian  Jaminan  in  accordance  to  Fiduciary  Guarantee 
Fidusia  Atas  Kendaraan  No.  W.10.00426020.  Deed No. W.10.00426020.AH.05.01 dated 
AH.05.01  tanggal  26  Pebruari  2012  senilai   February  26,  2012  amounted  to  
Rp 620.000.000 (Catatan 16).  Rp 620,000,000 (Note 16). 
 

166
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada  tanggal  30  September 2019, seluruh  tagihan    As  of  September  30,  2019,  all  amount  due 
kepada pengguna jasa proyek Pembangunan Jalan  from customers of the Cibitung – Cilincing Toll 
Tol  Cibitung  –  Cilincing,  Pembangunan  Koneksi  Road project, Connection of Bekasi – Cawang 
Jalan  Tol  Bekasi  –  Cawang  –  Kampung  Melayu  –  Kampung  Melayu  Toll  Road  to  Wiyoto 
dengan  Tol  Wiyoto  Wiyono,  Bendungan  Way  Wiyono  Toll  Road  project,  Way  Sekampung 
Sekampung  di  Kabupaten  Pringsewu  (Paket  2),  Dam  at  Pringsewu  District  (Package  2), 
Bendungan  Leuwikeris  Paket  2,  SPAM  Aceh,  Leuwikeris  Dam  Package  2,  SPAM  Aceh, 
Bendungan Jlantah, Light  Rail  Transit  di  Sumatera  Jlantah  Dam,  Light  Rail  Transit  at  South 
Selatan,  dan  Jalan  Tol  Terbanggi  Besar  Kayu  Sumatera,  and  Terbanggi  Besar  Kayu  Agung 
Agung VGF Japek digunakan sebagai jaminan atas  VGF  Japek  Toll  Road  Project  are  used  as 
utang  bank  PT  Bank  Negara  Indonesia  (Persero)  collateral  for  PT  Bank  Negara  Indonesia 
Tbk (Catatan 5). (Persero) Tbk (Note 5). 
 
Perjanjian ini juga mencakup batasan-batasan yang    Under  the  agreement  the  Company  is  not 
tidak  diperkenankan  dilakukan  oleh  Perusahaan  allowed  to  do certain  actions without  the  prior 
tanpa persetujuan tertulis terlebih dahulu dari Bank,  written  consent  by  the  Bank,  such  as  to 
antara  lain  melakukan  perubahan  kegiatan  usaha;  change  business  activities;  sell  or  transfer  
menjual  atau  memindahkan  hak  atau  mengalihkan  the  rights  or  transfer  all  or  part  of  
seluruh  atau  sebagian  kekayaan/aset  milik  dalam  the  property/assets  owned  in  a  single 
satu  transaksi  atau  dalam  beberapa  transaksi  transaction  or  in  a  several  transaction  unless 
kecuali  menjual  atau  mengalihkan  aset  kecuali  sell or transfer assets that is arm's length; sell 
yang  bersifat  arm’s  length;  menjual  atau  or  transfer  assets  in  exchange  for  or 
mengalihkan  aset  sebagai  ganti  atau  digantikan  replacement  of  other  assets  that  are 
aset  lainnya  yang  sebanding  atau  lebih  baik  tipe  comparable  or  better  type  of  the  nature  and 
sifat  dan  kualitasnya;  menjual  atau  mengalihkan  quality; sell or transfer assets in the context of 
aset  dalam  rangka  pelaksanaan  reorganisasi  oleh  the  reorganization  by  the  Government  of 
Pemerintah  Republik  Indonesia  sepanjang  Republic  Indonesia  through  the  sale  of  these 
penjualan  aset  tersebut  tidak  mempunyai  akibat  assets  do  not  have  material  effect;  performed 
material;  dilakukan  dengan  syarat  akan  menjadi  with with the provision of becoming a surviving 
badan hukum yang bertahan (surviving legal entity);  legal  entity;  amendments  to  it  may  result  to 
melakukan  perubahan  anggaran  dasar  yang  dapat  material;  filing  a  petition  for  bankruptcy  or 
menimbulkan  akibat  material;  mengajukan  suspension  of  payment  obligation  payable  to 
permohonan  pailit  atau  permohonan  penundaan  the relevant authorities.
kewajiban pembayaran utang kepada instansi yang 
berwenang.
     
Perusahaan  diwajibkan  untuk  mempertahankan  The  Company  should  maintain  the  following 
rasio  keuangan  sebagai  berikut:  current  ratio  financial  ratios:  current  ratio  at  least  1  (one), 
minimal 1 (satu) kali, debt to equity ratio maksimal 3  debt  to  equity  ratio  of  a  maximum  3  (three) 
(tiga) kali dan debt service coverage minimal 100%.  and  debt  service  coverage  of  at  least  100%.  
Pemenuhan pembatasan pinjaman bank dilaporkan  The  fulfillment  of  bank  lending  restrictions  will 
oleh  Perusahaan  setiap  akhir  tahun  dan  akan  be  reported  by  the  Company  at  the  end  of        
dievaluasi  oleh  PT  Bank  Negara  Indonesia  the  year  and  will  be  evaluated  by  PT  Bank 
(Persero) Tbk.  Negara Indonesia (Persero) Tbk.
   
Pada  tanggal  30  September  2019  dan  31  As  of  September  30,  2019  and  
Desember  2018  saldo  pinjaman  Perusahaan  ke   December  31,  2018  the  balance  of  loan  to  
PT  Bank  Negara  Indonesia  (Persero)  Tbk  masing- PT  Bank  Negara  Indonesia  (Persero)  Tbk 
masing  sebesar  Rp  2.571.349.532.576  dan   amounted  to  Rp 2,571,349,532,576  and 
Rp 2.644.000.000.000.  Rp 2,644,000,000,000, respectively.  

Entitas Anak – WTR Subsidiary – WTR


     
1. PT Bank Negara Indonesia (Persero) Tbk    1. PT Bank Negara Indonesia (Persero) Tbk
   
 
 
   

a.  Utang Bank Sindikasi PBTR a.  Syndication Bank Loan PBTR


     
Berdasarkan  Akta  notaris  Ariani  Lakhsmijati    Based  on  Notarial  deed  No.  37  of  Ariani 
Rachim, S.H., No. 37 tanggal 24 Mei 2017 dan Akta  Lakhsmijati Rachim S.H., dated May 24, 2017 
notaris  Ariani  Lakhsmijati  Rachim,  S.H.,  No.  48  and Notarial deed No. 48 of Ariani Lakhsmijati 
tanggal  27  Agustus  2018,  PBTR  telah  Rachim  S.H.,  dated  August  27,  2018,       
menandatangani perjanjian Kredit Sindikasi dengan  PBTR  entered  into  a  Syndicated  Loan 
PT Bank Negara Indonesia (Persero) Tbk, PT Bank  Agreement  with  PT  Bank  Negara  Indonesia 
Panin  Tbk,  PT  Bank  Papua,  PT  Bank  (Persero)  Tbk,  PT  Bank  Panin  Tbk,  PT  Bank 

167
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pembangunan  Daerah  Sulawesi  Selatan  dan  Papua,  PT  Bank  Pembangunan  Daerah 
Sulawesi  Barat,  PT  Bank  Arta  Graha  Internasional  Sulawesi  Selatan  dan  Sulawesi  Barat,     
Tbk,  PT  Bank  Pembangunan  Daerah  Maluku  dan  PT  Bank  Arta  Graha  Internasional  Tbk,    
Maluku  Utara,  PT  Bank  Pembangunan  Daerah  PT  Bank  Pembangunan  Daerah  Maluku  dan 
Daerah  Istimewa  Yogyakarta,  PT  Bank  Maluku Utara, PT Bank Pembangunan Daerah 
Pembangunan  Daerah  Jambi,  PT  Bank  Nagari,  Daerah  Istimewa  Yogyakarta,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Kalimantan  Pembangunan  Daerah  Jambi,  PT  Bank 
Tengah,  PT  Bank  Pembangunan  Daerah  Bali,  Nagari,  PT  Bank  Pembangunan  Daerah 
PT  Bank  Pembangunan  Daerah  Sumatera  Utara,  Kalimantan  Tengah,  PT  Bank  Pembangunan 
PT  Bank  Pembangunan  Daerah  Jawa  Tengah,  Daerah  Bali,  PT  Bank  Pembangunan  Daerah 
PT Bank Negara Indonesia Syariah, PT Bank Jabar  Sumatera  Utara,  PT  Bank  Pembangunan 
Banten  Syariah,  PT  Bank  Aceh  Syariah,  Daerah  Jawa  Tengah,  PT  Bank  Negara 
PT Indonesia Infrastructure Finance,  PT Bank Riau  Indonesia  Syariah,  PT  Bank  Jabar  Banten 
Kepri,  PT  Bank  Sumsel  Babel,  PT  Pembangunan  Syariah, PT Bank Aceh Syariah, PT Indonesia 
Daerah  Kalimantan  Selatan,  PT  Pembangunan  Infrastructure  Finance,  PT  Bank  Riau           
Daerah  Sulawesi  Tengah,  PT  Bank  Pembangunan  Kepri,  PT  Bank  Sumsel  Babel,  
Daerah  Istimewa  Yogyakarta  Syariah,  PT  Bank  PT  Pembangunan  Daerah  Kalimantan 
Riau Kepri Syariah dan PT Bank Kalsel Syariah.  Selatan,  PT  Pembangunan  Daerah  Sulawesi 
Tengah,  PT  Bank  Pembangunan  Daerah 
Istimewa  Yogyakarta  Syariah,  PT  Bank  Riau 
Kepri Syariah dan PT Bank Kalsel Syariah. 
     
Keduapuluh  empat  bank  tersebut  memberikan    These  twenty  four  banks  provided  a                   
fasilitas  kredit  maksimum  sebesar  credit  facility  with  a  maximum  credit  facility 
Rp  5.248.541.000.000  yang  terdiri  dari  Kredit  limit  of  Rp  5,248,541,000,000  which             
Investasi  dan  Kredit  Bunga  masa  Konstruksi  (IDC)  consists  of  Investment  Credit  and                    
masing-masing sebesar  Rp  4.919.070.000.000  dan  Interest  During  Construction  (IDC)  
Rp  329.471.000.000.  Kedua  fasilitas  tersebut  amounted  to  Rp  4,919,070,000,000  and             
diberikan  untuk  keperluan  pembangunan  Jalan  Tol  Rp  329,471,000,000,  respectively.  Both 
Ruas Pemalang – Batang.  facilities  are  provided  for  the  development  of 
Pemalang - Batang Toll Road. 
     
Jangka  waktu  kredit  investasi  dan  IDC  adalah    The  investment  credit  and  IDC  have  a  credit 
162  bulan  atau  14  tahun  termasuk  masa  tenggang  term loan of 162 months or 14 years including 
24  bulan  atau  2  tahun  sejak  tanggal  efektif.  Suku  a  grace  period  of  24  months  or  2  years  from 
bunga adalah rata- rata tertimbang atas dasar suku  the effective date. The interest rate of this loan 
bunga  yaitu  Reference  Rate  (LPS)  ditambah  is  weighted  average  interest  rate  based  on     
dengan  Margin  atau  setara  dengan  10,5%  per  the  Reference  Rate  (LPS)  plus  Margin  or 
tahun.  equivalent to 10.5% per annum. 
     
Pada  tanggal  30  September  2019  dan   As of September 30, 2019 and December 31, 
31  Desember  2018 saldo  pinjaman  kredit  investasi  2018,  the  balance  of  PBTR  investment  credit 
PBTR ke PT Bank Negara Indonesia (Persero) Tbk  loan  to  PT  Bank  Negara  Indonesia  (Persero) 
masing-masing sebesar Rp 1.398.630.523.750 dan  Tbk  amounted  to  Rp 1,398,630,523,750,  and 
Rp 4.366.424.126.771.  Rp 4,366,424,126,771, respectively.  
   
Pada  tanggal  30  September  2019  dan   As  of September 30, 2019 and December 31, 
31  Desember  2018,  saldo  pinjaman  kredit  IDC  2018  the  balance  of  PBTR  IDC  credit  loan  
PBTR ke PT Bank Negara Indonesia (Persero) Tbk  to  PT  Bank  Negara  Indonesia  (Persero)  
masing-masing  sebesar  Rp  99.494.476.250  dan   Tbk  amounted  to  Rp 99,494,476,250  and 
Rp 106.699.789.831.  Rp 106,699,789,831, respectively.  
     
b.  Utang Bank Sindikasi KKDM  b.  Syndication Bank Loan KKDM 
   
Berdasarkan  Akta  notaris  No.  37  tanggal  31  Mei  Based  on  Deed  No.  37  dated  May  31,  2018, 
2018  dari  notaris  Sri  Burlian,  S.H.,  Perusahaan   by  notary  Sri  Burlian,  S.H.,  the  Company 
telah  menandatangani  perjanjian  kredit  dengan   obtained  a  loan  agreement  with  PT  Bank 
PT  Bank  Rakyat  Indonesia  (Persero)  Tbk.  Bank  Rakyat  Indonesia  (Persero)  Tbk.  These  bank 
tersebut  memberikan  fasilitas  kredit  maksimum  provided Working  Capital Loan  with  maximum 
sebesar  Rp  1.380.074.000.000  yang  merupakan  credit  facility  limit  of  Rp  1,380,074,000,000. 
Kredit  Modal  Kerja  (KMK).  Fasilitas  tersebut  There  facilities  is  provided  for  the  land 
diberikan    untuk  pembiayaan  dana  talangan  acquisition  bailout  for  the  development  of 
pengadaan tanah Proyek Jalan Tol Bekasi Cawang  Bekasi  Cawang  Kampung  Melayu  Toll  Road 
Kampung Melayu (Becakayu).  Project (Becakayu). 

168
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perusahaan  wajib  mempertahankan  financial  The  Company  is  required  to  maintain  a 
covenant, sebagai berikut:  financial covenant, as follows: 
1)  CR minimal 1,0 kali;  1)  CR at least 1.0 time; 
2)  DER  (Total  Debt  terhadap  Total  Equity)  2)  DER (Total Debt to Total Equity) maximum 
maksimal 3,0 kali;  3.0 times; 
3)  DSCR  (Debt  Services  Coverage  Ratio)  sejak  3)  DSCR  (Debt  Services  Coverage  Ratio) 
tahun 2022 minimal 100%.  since 2022 at least 100%. 
   
Perusahaan  tidak  diperkenankan  untuk  melakukan  The  Company  is  not  allowed  to  do  any  of           
hal-hal  sebagai  berikut  seperti  menyerahkan  atau  the  following  matters  such  as  submitting  or 
mengalihkan  seluruh  atau  sebagian  dari  hak  transferring  all  or any of  the Company's  rights 
dan/atau  kewajiban  Perusahaan  yang  timbul  and  /  or  obligations  arising  under  Transaction 
berdasarkan  Dokumen  Transaksi  kepada  pihak  Document  to  other  parties,  changing           
lain,  melakukan  perubahan  kegiatan  usaha  the  business  activities  as  contained  in           
sebagaimana  tercantum  dalam  anggaran  dasar  the  articles  of  association  which  may  reduce 
yang  dapat  mengurangi  kemampuan  Perusahaan  the  Company's  ability  to  fulfill  its  obligations, 
untuk  memenuhi  kewajibannya,  mengajukan  applying  for  PKPU  or  bankruptcy,  obtaining 
permohonan  PKPU  atau  kepailitan,  memperoleh  new  credit/facilities  or  other  loans  from  a 
kredit/fasilitas  baru  atau  pinjaman  lainnya  dari  financial  institution,  binding  itself  as  debt 
lembaga  keuangan,  mengikatkan  diri  sebagai  guarantor,  changing  shareholder  structure, 
penjamin  utang,  mengubah  susunan  pemegang  giving  credit  to  any  party,  making  dividend 
saham, memberikan kredit kepada pihak manapun,  payments,  issuing  new  shares  which  may 
melakukan  pembagian  dividen,  menerbitkan  result  in  a  percentage  of  composition  share 
saham-saham  baru  yang  dapat  mengakibatkan   ownership  by  existing  shareholders  becomes 
presentase  komposisi  kepemilikan  saham  oleh  diluted. 
pemegang-pemegang  saham  existing  menjadi 
terdilusi. 
   
Pada  tanggal  30  September  2019  dan   As  of September 30, 2019 and December 31, 
31  Desember  2018 saldo  pinjaman  kredit  investasi  2018,  the  balance  of  KKDM  investment  credit 
KKDM ke PT Bank Negara Indonesia (Persero) Tbk  loan  to  PT  Bank  Negara  Indonesia  (Persero) 
masing-masing sebesar Rp 1.738.514.999.995 dan  Tbk  amounted  to  Rp 1,738,514,999,995  and 
Rp 1.745.075.999.998.  Rp 1,745,075,999,998, respectively.  
   
c.  Utang Bank Sindikasi CCT c.  Syndication Bank Loan CCT
     
Berdasarkan  Akta  Notaris  Ariani  Lakhsmijati    Based  on  Notarial  Deed  No.  117  of  Ariani 
Rachim,  S.H.,  No.  117  tanggal  24  April  2019,  Lakhsmijati Rachim S.H., dated April 24 2019, 
Perusahaan  telah  menadatangani  perjanjian  Kredit  the  Company  PT  Bank  Rakyat  Indonesia 
Sindikasi  dengan  PT  Bank  Negara  Indonesia,   (Persero)  Tbk  entered  into  Loan  Syndication 
PT  Bank  Rakyat  Indonesia,  PT  Bank  Panin,   with  PT  Bank  Negara  Indonesia,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Jawa  Timur,   Rakyat  Indonesia,  PT  Bank  Panin,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Sumatera  Barat,  Pembangunan  Daerah  Jawa  Timur,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Nusa  Tenggara  Pembangunan  Daerah  Sumatera  Barat,  
Timur,  PT  Bank  Pembangunan  Daerah  Jawa  PT  Bank  Pembangunan  Daerah  Nusa 
Tengah,  PT  Bank  Pembangunan  Daerah  Bali,   Tenggara  Timur,  PT  Bank  Pembangunan 
PT  Bank  Pembangunan  Daerah  Papua,  PT  Bank  Daerah Jawa Tengah, PT Bank Pembangunan 
Pembangunan  Daerah  Kalimantan  Selatan,   Daerah  Bali,  PT  Bank  Pembangunan  Daerah 
PT  Bank  Pembangunan  Daerah  Kalimantan  Timur  Papua,  PT  Bank  Pembangunan  Daerah 
dan  Kalimantan  Utara,  PT  Bank  Pembangunan  Kalimantan  Selatan,  PT  Bank  Pembangunan 
Daerah Maluku dan Maluku Utara, PT Bank Negara  Daerah  Kalimantan  Timur  and  Kalimantan 
Indonesia  Syariah,  PT  Bank  Rakyat  Indonesia  Utara, PT Bank Pembangunan Daerah Maluku 
Syariah, PT BPD Kalimantan Timur dan Kalimantan  dan Maluku Utara, PT Bank Negara Indonesia 
Utara  unit  usaha  Syariah,  PT  Bank  Panin  Dubai  Syariah,  PT  Bank  Rakyat  Indonesia  Syariah, 
Syariah,  PT  BPD  Jawa  Timur  unit  usaha  Syariah,  PT  BPD  Kalimantan  Timur  and  Kalimantan 
PT  BPD  Kalimantan  Selatan  unit  usaha  Syariah,   Utara  Syariah,  PT  Bank  Panin  Dubai  Syariah, 
PT  BPD  Sumatera  Selatan  Dan  Bangka  Belitung  PT  BPD  Jawa  Timur  Syariah,  PT  BPD 
Unit  Usaha  Syariah,  PT  BPD  Jawa  Barat  dan  Kalimatan Selatan Syariah, PT BPD Sumatera 
Banten  Syariah.  Kedua  puluh  satu  bank  tersebut  Selatan  and  Bangka  Belitung,  PT  BPD  Jawa 
memberikan  fasilitas  kredit  maksimum  sebesar   Barat  and  Banten  Syariah.  These  twenty  one 
Rp  5.350.000.000.000  yang  terdiri  dari  Kredit  banks  are  providing  a  credit  facility  with  a 
Investasi  dan  kredit  bunga  masa  konstruksi  credit  ceiling  of  Rp  5,350,000,000,000  which 
masing-masing sebesar Rp 4.831.095.463.734 dan  consists  of  investment  during  construction  

169
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Rp518.904.536.266.  Kedua  fasilitas  tersebut  amounted  to  Rp  4,831,095,463,734  and 
diberikan  untuk  keperluan pembangunan  Jalan  Tol  Rp518,904536,266. Both facilities are provided 
Ruas Cimanggis-Cibitung.  for the development of Cimanggis-Cibitung. 
     
Jangka  waktu  Kredit  Investasi  dan  Kredit  Interest    The  investment  credit  and  interest  during 
During  Construction  (IDC)  adalah  180  bulan  constructin  credit    term  loan  was  180  months 
termasuk  masa  tenggang  36  bulan  sejak  tanggal  or  36  months  including  a  grace  period  of  36 
efektif. Suku bunga yang dikenakan adalah sebesar  months  from  the  effective  date.  The  interest 
reference  rate  (ATD)  ditambah  dengan  Margin  rate  of  this  loan  is  reference  rate  (ATD)  plus 
4,625% selama masa konstruksi dan 4,375% masa  margin  4,625%  during  construction  and 
operasi.  4,375% during operation. 
     
Pada  tanggal  30  September  2019  dan   As of September 30, 2019 and December 31, 
31 Desember 2018, saldo pinjaman kredit investasi  2018,  the  balance  of  CCT  investment  credit 
CCT  ke  PT  Bank  Negara  Indonesia  (Persero)  Tbk  loan  to  PT  Bank  Negara  Indonesia  (Persero) 
masing-masing  sebesar  Rp  118.504.498.097  dan  Tbk amounted to Rp 118,504,498,097 and Nil, 
Nihil.  respectively.  
   
Pada  tanggal  30  September  2019  dan   As  of September 30, 2019 and December 31, 
31 Desember 2018 saldo pinjaman kredit IDC CCT  2018  the  balance  of  CCT  IDC  credit  loan  to  
ke  PT  Bank  Negara  Indonesia  (Persero)  Tbk  PT  Bank  Negara  Indonesia  (Persero)  Tbk 
masing-masing  sebesar  Rp  7.177.101.422  dan  amounted  to  Rp 7,177,101,422  and  Nil, 
Nihil.  respectively.  
   
d.  Utang Bank Sindikasi WBW d.  Syndication Bank Loan WBW
     
Berdasarkan  keterangan  Notaris  Ariani  L.  Rachim,  Based  on  the  statement  of  Notary  Ariani  L. 
SH No 23/ALR/NOT/XII/2018 tanggal 21 Desember  Rachim,  SH  No.  23/ALR/NOT/XII/2018  
2018  dan  keputusan  Kredit  Pembiayaan  Sindikasi  dated December 21, 2018 and the Syndicated 
WBW  No.  SDK/2.2/3618  tanggal  21  Desember  Financing  Credit  decision  WBW  
2018,  No.  1236/SJK/SDK/12/2018  tanggal   No.  SDK/2.2/3618  dated  December  21,  2018, 
21  Desember  2018,  No.  O64/S/CSAD/XII/2018  No.  1236/SJK/SDK/12/2018  dated  December 
tanggal  10  Desember  2018  dan  No.  S-1053/  SMI/  21,  2018,  No.O64/S/CSAD/XII/2018  dated 
DPI/1218  tanggal  21  Desember  2018,  WBW  telah  December  10,  2018  and  No.  S-1053/SMI/ 
menandatangani perjanjian Kredit Sindikasi dengan  DPI/1218  dated    December  21,  2018,  WBW 
PT Bank Negara Indonesia (Persero) Tbk, PT Bank  entered  into  Loan  Syndication  with  PT  Bank 
Rakyat  Indonesia  (Persero)  Tbk,  PT  Sarana  Multi  Negara  Indonesia  (Persero)  Tbk,  PT  Bank 
Infrastruktur, PT Bank Pembangunan Daerah Jawa  Rakyat  Indonesia  (Persero)  Tbk,  PT  Bank 
Timur, PT Bank Pembangunan Daerah Riau Kepri,  CIMB  Niaga  Tbk,  PT  Sarana  Multi 
PT  Bank  Pembangunan  Daerah  Nusa  Tenggara  Infrastruktur,  PT  Bank  Pembangunan  Daerah 
Timur, PT Bank Pembangunan Daerah Maluku dan  Jawa  Timur,  PT  Bank  Pembangunan  Daerah 
Maluku  Utara,  PT  Bank  Pembangunan  Daerah  Riau  Kepri,  PT  Bank  Pembangunan  Daerah 
Kalimantan  Selatan,  PT  Bank  Pembangunan  Nusa  Tenggara  Timur,  PT  Bank 
Daerah  Sumatera  Selatan  dan  Bangka  Belitung,   Pembangunan  Daerah  Maluku  dan  Maluku 
PT  Bank  Pembangunan  Daerah  Kalimantan   Utara,  PT  Bank  Pembangunan  Daerah 
Barat,  PT  Bank  Pembangunan  Daerah  Bengkulu,  Kalimantan  Selatan,  PT  Bank  Pembangunan 
PT  Bank  Pembangunan  Daerah  Bali,   Daerah  Sumatera  Selatan  dan  Bangka 
PT  Pembangunan  Daerah  Bank  Papua,  PT  Bank  Belitung,  PT  Bank  Pembangunan  Daerah 
CIMB  Niaga  Tbk  Unit  Syariah,  dan  PT  Bank  Kalimantan  Barat,  PT  Bank  Pembangunan 
Pembangunan  Daerah  Jawa  Timur  Unit  Syariah.  Daerah  Bengkulu,  PT  Bank  Pembangunan 
Sesuai  keputusan  Kreditur  Sindikasi  untuk  Daerah  Bali,  PT  Pembangunan  Daerah  Bank 
partisipasi  dalam  pembiayaan  sindikasi  WBW   Papua,  PT  Bank  CIMB  Niaga  Tbk  Unit 
untuk  keperluan  Kredit  Investasi  pembiayaan  Syariah,  dan  PT  Bank  Pembangunan  Daerah 
pembangunan dengan limit fasilitas kredit investasi  Jawa  Timur  Unit  Syariah.  In  accordance  with 
sebesar  Rp  5.360.084.000.000  dengan  jangka  the  decision  of  the  Syndicated  Creditors  for 
waktu  maksimum  180  bulan  sejak  Penandatangan  participation  in  syndicated  financing  of 
Perjanjian  Kredit  termasuk  Grace  Period  dengan  PT  Waskita  Bumi  Wira  for  Credit  purposes 
suku  bunga  masa  konstruksi  adalah  Reference  Development  financing  investment  with  an 
Rate +.  investment  credit  facility  limit  of 
Rp 5,360,084,000,000 with a maximum period 
of  180  months  from  the  Signing  of  the  Credit 
Agreement including the Grace Period with the 
construction  interest  rate  is  the  Reference 
Rate +. 

170
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Margin  eqv  10,50%  untuk  Tranche  1A  dan  1B  Margin  eqv  10.50%  for  Tranche  1A  and  1B 
dan  Reference  Rate  +  Margin  eqv  11,50%  and  Reference  Rate  +  Margin  eqv 11.50%  for 
untuk Tranche 1C dan 1D.  Tranche 1C and 1D. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30, 2019 and  December  31, 
2018  saldo  pinjaman  kredit  investasi WBW  kepada  2018  the  balance  of  WBW  investment  credit 
PT  Bank  Negara  Indonesia  (Persero)  Tbk  adalah  loan  to  PT  Bank  Negara  Indonesia  (Persero) 
sebesar Rp 197.458.325.081 dan Nihil.  Tbk amounted to Rp 197,458,325,081 and Nil, 
respecttivelly. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30, 2019 and  December  31, 
2018  saldo  pinjaman  kredit  IDC  WBW  kepada   2018,  the  balance  of  CCT  IDC  credit  loan  to 
PT  Bank  Negara  Indonesia  (Persero)  Tbk  adalah  PT  Bank  Negara  Indonesia  (Persero)  Tbk 
sebesar Rp 4.764.289.629 dan Nihil.  amounted  to  Rp  4,764,289,629  and  Nil, 
respectivelly. 
   
2. PT Bank Rakyat Indonesia (Persero) Tbk 2. PT Bank Rakyat Indonesia (Persero) Tbk
   
a.  Perjanjian Kredit dan Fasilitas Kredit TJT  a.  Loan Agreement and Loan Facility TJT 
   
Berdasarkan  Akta  No.  86  tanggal  29  Mei  2015  dari  Based on Deed No. 86 dated May 29, 2015 of 
Muchlis  Patahna,  S.H.,  MKn,  Notaris  di  Jakarta,  Muchlis Patahna, S.H., MKn, Notary in Jakarta, 
TJT  dan  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk  TJT  and  PT  Bank  Rakyat  Indonesia  (Persero) 
menandatangani  perjanjian  kredit  dengan  fasilitas  Tbk  signed  a  loan  agreement  providing 
kredit  maksimum  sebesar  Rp 1.915.000.000.000  a  loan  facilities  with  a  maximum  of 
yang  terdiri  dari  kredit  investasi  dan  kredit  bunga  Rp 1,915,000,000,000  which  consists  of 
masa  konstruksi  masing-masing  sebesar  investment  and  interest  credit 
Rp  1.754.000.000.000  dan  Rp 161.000.000.000.  during  constructions  amounted  to 
Kedua  fasilitas  tersebut  diberikan  untuk  keperluan  Rp 1,754,000,000,000 and Rp 161,000,000,000, 
pembangunan  Jalan  Tol  Ruas  Ciawi  -  Sukabumi  respectively.  Both  of  loan  facilities  were 
seksi 1 (Ciawi - Cigombong) 15,35 Km.   provided  for  construction  of  Ciawi-Sukabumi 
Toll  Road  section  1  (Ciawi-Cigombong) 
15.35 Km.  
   
Berdasarkan  Akta  No.  37  tanggal  14  Juni  2016  Based on Deed No. 37 dated June 14, 2016 of 
dari Muchlis Patahna S.H., M.Kn., notaris di Jakarta,  Muchlis  Patahna,  S.H.,  M.Kn.,  notary  in 
Perusahaan  dan  PT  Bank  Rakyat  Indonesia  Jakarta,  the  Company  and  PT  Bank  Rakyat 
(Persero) Tbk menandatangani Adendum Perjanjian  Indonesia  (Persero)  Tbk  entered  into  an 
Kredit  Investasi  dan  Perjanjian  Kredit  Investasi  (KI)  addendum of Investment Credit agreement and 
dan  Perjanjian  Kredit  Investasi  Interest  During  Investment  Credit  Interest  During  Construction 
Construction  (IDC),  dengan  mengubah  beberapa  (IDC),  by  changing  certain  clauses  among 
ketentuan antara lain:  others: 
   
a)  Mengubah  suku  bunga  fasilitas  Kredit    a)  Changing loan interest of Investment Credit 
Investasi  menjadi  sebesar  11,75%  per  tahun  to  11.75%  per  year  paid  effectively  every 
dibayar  efektif  setiap  bulan,  dan  mengubah  month,  and  changing  Loan  Interest  Credit 
suku  bunga  fasilitas  KI  IDC  menjadi  sebesar  Interest During Construction to 11.75% per 
11,75% per tahun dibayar efektif setiap bulan  year paid effectively every month 
 
b)  Perubahan  Corporate  Guarantee  menjadi    b)  Changing  the  Corporate  Guarantee  into 
atas nama PT Waskita Toll Road.  PT Waskita Toll Road. 
     
Berdasarkan  Akta  notaris  Sriyani  Burlian,  S.H    Based  on  Notarial  deed  No.  34  of  Sriyani 
No.  34  tanggal  31  Mei  2018,  TJT  memperoleh  Burlian,  S.H.,  dated  May  31,  2018,  TJT 
Fasilitas  Pinjaman  non-revolving  dengan  pagu  obtained  nonrevolving  credit  facility  with  a 
pinjaman  sebesar  Rp  2.078.065.000.000  yang  maximum  credit  of  Rp  2,078,065,000,000 
terdiri  dari  Tranche  I  Rp  500.000.000.000  dan  which  consist  of  Tranch  I  Rp  500,000,000,000 
Tranche  II  Rp  1.578.065.000.000.  Fasilitas  and  Tranch  II  of  Rp  1,578,065,000,000. 
pinjaman  ini  diberikan  untuk  dana  talangan  The purpose of  this credit is for bailout of land 
pembebasan  tanah.  Jangka  waktu  fasilitas  kredit  acquisition.  The  credit  have  a  credit  term  until 
terhitung  sejak  ditandatanganinya  akta  perjanjian  May  31,  2020  with  interest  rate  of  8.25%  per 
kredit  sampai  dengan  31  Mei  2020  dengan  tingkat  annum. 
suku bunga sebesar 8,25% per tahun. 

171
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  kredit  dana  talangan  tanah  TJT  ke  2018  the  balance  of  a  credit  facility  for  land 
PT Bank  Rakyat  Indonesia  (Persero)  Tbk  masing- bailouts  TJT  to  PT  Bank  Rakyat 
masing sebesar Rp 371.930.624.515 dan Nihil.  Indonesia  (Persero)  Tbk  amounted  to 
Rp 371,930,624,515 and Nil, respectively. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  kredit  investasi  TJT  ke  PT Bank  Rakyat  2018,  the  balance  of  investment  credit  of  TJT 
Indonesia  (Persero)  Tbk  masing-masing  sebesar  to  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
Rp 1.724.484.493.587 dan Rp 2.321.978.783.431.  amounted  to  Rp 1,724,484,493,587  and 
Rp 2,321,978,783,431, respectively. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  kredit  IDC  dari  TJT  ke  PT Bank  Rakyat  2018,  the  balance  of  IDC  investment  of 
Indonesia  (Persero)  Tbk  masing-masing  sebesar  TJT  to  PT  Bank  Rakyat  Indonesia  (Persero) 
Rp 115.175.422.643 dan Rp 116.382.922.643.  Tbk  amounted  to  Rp 115,175,422,643  and 
Rp 116,382,922,643, respectively. 
   
b.  Perjanjian Kredit dan Fasilitas Kredit KKDM  b.  Loan Agreement and Loan Facilitie KKDM 
     
Berdasarkan  Akta  Notaris  Sri  Burlian,  SH.,  No.  37    Based on Deed Notary Sri Burlian, SH., No. 37 
tanggal  31  Mei  2018,  Perusahaan  telah  dated Mei 31, 2018, the Company entered into 
menandatangani  perjanjian  Kredit  dengan  PT  Bank  Loan  Agreement  with  PT  Bank  Rakyat 
Rakyat  Indonesia  (Persero)  Tbk.  Bank  tersebut  Indonesia (Persero) Tbk. These bank provided 
memberikan  fasilitas  kredit  maksimum  sebesar  a  credit  Working  Capital  Loan  with  maximum 
Rp  1.380.074.000.000  yang  merupakan  Kredit  credit  facility  limit  of  Rp1.380.074,000,000. 
Modal  Kerja  (KMK).  Fasilitas  tersebut  diberikan  There  facilities  is  provided  for  the  land 
untuk  pembiayaan  dana  talangan  pengadaan  tanah  acquisition  bailout  for  the  development 
proyek  Jalan  Tol  Bekasi  –  Cawang  -  Kampung  of  Bekasi  –  Cawang  -  Kampung  Melayu 
Melayu (Becakayu).  (Becakayu). 
     
Berdasarkan  Akta  Notaris  Ariani  L,  Rachim,  SH    Based  on  Deed  No.  72  dated  October  30, 
nomor  72  tanggal  30  Oktober  2015,  PT  KKDM  2015,  Ariani  L,  Rachim,  SH,  PT  KKDM 
mendapatkan  fasilitas  kredit  Sindikasi  dengan  obtained  credit  facility  from  PT  Bank  Rakyat 
PT  Bank  Rakyat  Indonesia  (Persero)  Tbk  dan  Indonesia  (Persero)  Tbk  and  PT  Bank  Negara 
PT  Bank  Negara  Indonesia  (Persero)  Tbk  sebesar  Indonesia  (Persero)  Tbk  amounted  to 
Rp 3.498.899.000.000.  Rp 3,498,899,000,000. 
     
Kredit  ini  untuk  keperluan  pembangunan  Jalan  Tol    This  credit  is  for  the  development  of  Bekasi- 
Bekasi  –  Cawang  -  Kampung  Melayu,  dengan  Cawang  -  Kampung  Melayu  Toll  Road,  with 
jangka  waktu  selama  15  tahun  dan  dengan  tingkat  term  of  15  years  and  with  interest  rate  BI  –  7 
bunga  BI  –  7  days  Repo  rate  dan  marjin  sebesar  days Repo rate and margin 5,25% per annum. 
5.25% per tahun. 
     
Perusahaan  wajib  mempertahankan  financial    The  Company  is  required  to  maintain  a 
covenant, sebagai berikut:  financial covenant, as follows: 
-  CR minimal 1,0 kali;  -  CR at least 1.0 times; 
-  DER maksimal 3,0 kali;  -  DER maximum 3.0 times; 
-  DSCR  (Debt  Services  Coverage  Ratio)  sejak  -  DSCR  (Debt  Services  Coverage  Ratio) 
tahun 2022 minimal 100%.  since 2022 at least 100%. 
     
Perusahaan  tidak  diperkenankan  untuk  melakukan    The  Company  is  not  allowed  to  do  any  of 
hal-hal  sebagai  berikut  seperti  menyerahkan  atau  the  following  matters  such  as  submitting  or 
mengalihkan  seluruh  atau  sebagian  dari  hak  transferring  all  or  any  of  the  Company's  rights 
dan/atau  kewajiban  Perusahaan  yang  timbul  and  or  obligations  arising  under  Transaction 
berdasarkan Dokumen Transaksi kepada pihak lain,  Document  to  other  parties,  changing 
melakukan perubahan kegiatan usaha sebagaimana  the  business  activities  as  contained  in 
tercantum  dalam  anggaran  dasar  yang  dapat  the  articles  of  association  which  may  reduce 
mengurangi  kemampuan  Perusahaan  untuk  the  Company's  ability  to  fulfill  its  obligations, 
memenuhi  kewajibannya,  mengajukan  permohonan  applying  for  PKPU  or  bankruptcy,  obtaining 
PKPU  atau  kepailitan,  memperoleh  kredit/fasilitas  new  credit/facilities  or  other  loans  from  a 
baru atau pinjaman lainnya dari lembaga keuangan,  financial  institution,  binding  itself  as  debt 
mengikatkan  diri  sebagai  penjamin  utang,  guarantor,  changing  shareholder  structure, 
mengubah susunan pemegang saham, memberikan   giving  credit  to  any  party,  making  dividend 
 

172
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
kredit  kepada  pihak  manapun,  melakukan    payments,  issuing  new  shares  which  may 
pembagian dividen, menerbitkan saham-saham baru  result  in  a  percentage  of  composition  share 
yang  dapat  mengakibatkan  prosentase  komposisi  ownership  by  existing  shareholders  becomes 
kepemilikan  saham  oleh  pemegang-pemegang  diluted. 
saham existing menjadi terdilusi. 
     
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  kredit  investasi  KKDM  ke  2018 the balance of investment credit of KKDM 
PT Bank  Rakyat  Indonesia  (Persero)  Tbk  masing- to  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
masing  sebesar  Rp  1.738.514.999.995  dan  amounted  to  Rp 1,738,514,999,995  and 
Rp 1.745.075.999.998.  Rp 1,745,075,999,998, respectively. 
     
c.  Perjanjian Kredit dan Fasilitas Kredit CCT  c.  Loan Agreement and Loan Facilitie CCT 
   
Berdasarkan  Akta  Notaris  Ariani  Lakhsmijati    Based  on  Notarial  Deed  No.  117  of  Ariani 
Rachim,  S.H.,  No.  117  tanggal  24  April  2019,  Lakhsmijati Rachim S.H., dated April 24 2019, 
Perusahaan  telah  menadatangani  perjanjian  Kredit  the  Company  PT  Bank  Rakyat  Indonesia 
Sindikasi  dengan  PT  Bank  Negara  Indonesia,   (Persero)  Tbk  entered  into  Loan  Syndication 
PT  Bank  Rakyat  Indonesia,  PT  Bank  Panin,   with  PT  Bank  Negara  Indonesia,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Jawa  Timur,   Rakyat  Indonesia,  PT  Bank  Panin,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Sumatera  Barat,  Pembangunan  Daerah  Jawa  Timur,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Nusa  Tenggara  Pembangunan  Daerah  Sumatera  Barat,  
Timur,  PT  Bank  Pembangunan  Daerah  Jawa  PT  Bank  Pembangunan  Daerah  Nusa 
Tengah,  PT  Bank  Pembangunan  Daerah  Bali,   Tenggara  Timur,  PT  Bank  Pembangunan 
PT  Bank  Pembangunan  Daerah  Papua,  PT  Bank  Daerah Jawa Tengah, PT Bank Pembangunan 
Pembangunan  Daerah  Kalimantan  Selatan,   Daerah  Bali,  PT  Bank  Pembangunan  Daerah 
PT  Bank  Pembangunan  Daerah  Kalimantan  Timur  Papua,  PT  Bank  Pembangunan  Daerah 
dan  Kalimantan  Utara,  PT  Bank  Pembangunan  Kalimantan  Selatan,  PT  Bank  Pembangunan 
Daerah Maluku dan Maluku Utara, PT Bank Negara  Daerah  Kalimantan  Timur  and  Kalimantan 
Indonesia  Syariah,  PT  Bank  Rakyat  Indonesia  Utara, PT Bank Pembangunan Daerah Maluku 
Syariah, PT BPD Kalimantan Timur dan Kalimantan  dan Maluku Utara, PT Bank Negara Indonesia 
Utara  unit  usaha  Syariah,  PT  Bank  Panin  Dubai  Syariah,  PT  Bank  Rakyat  Indonesia  Syariah, 
Syariah,  PT  BPD  Jawa  Timur  unit  usaha  Syariah,  PT  BPD  Kalimantan  Timur  and  Kalimantan 
PT  BPD  Kalimantan  Selatan  unit  usaha  Syariah,   Utara  Syariah,  PT  Bank  Panin  Dubai  Syariah, 
PT  BPD  Sumatera  Selatan  Dan  Bangka  Belitung  PT  BPD  Jawa  Timur  Syariah,  PT  BPD 
Unit  Usaha  Syariah,  PT  BPD  Jawa  Barat  dan  Kalimatan Selatan Syariah, PT BPD Sumatera 
Banten  Syariah.  Kedua  puluh  satu  bank  tersebut  Selatan  and  Bangka  Belitung,  PT  BPD  Jawa 
memberikan  fasilitas  kredit  maksimum  sebesar   Barat  and  Banten  Syariah.  These  twenty  one 
Rp  5.350.000.000.000  yang  terdiri  dari  Kredit  banks  are  providing  a  credit  facility  with  a 
Investasi  dan  kredit  bunga  masa  konstruksi  credit  ceiling  of  Rp  5,350,000,000,000  which 
masing-masing sebesar Rp 4.831.095.463.734 dan  consists  of  investment  during  construction  
Rp  518.904.536.266.  Kedua  fasilitas  tersebut  amounted  to  Rp  4,831,095,463,734  and  
diberikan  untuk  keperluan pembangunan  Jalan  Tol  Rp  518,904,536,266.  Both  facilities  are 
Ruas Cimanggis-Cibitung.  provided  for  the  development  of  Cimanggis-
Cibitung. 
     
Jangka  waktu  Kredit  Investasi  dan  Kredit  Interest    The  investment  credit  and  interest  during 
During  Construction  (IDC)  adalah  180  bulan  constructin  credit    term  loan  was  180  months 
termasuk  masa  tenggang  36  bulan  sejak  tanggal  or  36  months  including  a  grace  period  of  36 
efektif. Suku bunga yang dikenakan adalah sebesar  months  from  the  effective  date.  The  interest 
reference  rate  (ATD)  ditambah  dengan  Margin  rate  of  this  loan  is  reference  rate  (ATD)  plus 
4,625% selama masa konstruksi dan 4,375% masa  margin  4,625%  during  construction  and 
operasi.  4,375% during operation. 
   

173
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Berdasarkan Akta notaris Dewi Tenty Septi Artianty,    Based  on  Notarial  deed  No.  5  of  Dewi  Tenty 
S.H.,  M.H.,  M.Kn  No.  5  tanggal  6  Agustus  2018,  Septi  Artianty,  S.H.,  M.H.,  M.Kn,  dated  August 
PT  CCT  mendapatkan  Fasilitas  Pinjaman  dari  6,  2018,  PT  CCT  has  signed  a  financing 
PT Bank  Rakyat  Indonesia  (Persero)  Tbk  dengan  agreement  with  PT  Bank  Rakyat  Indonesia 
maksimum  kredit  sebesar  Rp  3.702.485.000.000  (Persero)  Tbk  with  a  maximum  credit  of 
yang  terdiri  dari  Tranche  I  Rp  1.002.287.000.000  Rp  3,702,485,000,000  which  consist  of 
dan  Tranche  II  Rp  2.700.198.000.000.  Fasilitas  Tranche  I  Rp  1,002,287,000,000  and  Tranche 
pinjaman  ini  diberikan  untuk  dana  talangan  II  of  Rp  2,700,198,000,000.  The  purpose  of 
pembebasan  tanah.  Jangka  waktu  fasilitas  kredit  credit  is  for  bailout  of  land  acqusition. 
terhitung  sejak  ditandatanganinya  akta  perjanjian  The  credit  has  a credit  term until  August  2020 
kredit  sampai  dengan  Agustus  2020 dengan tingkat  with interest rate of 8.25% per annum. 
suku bunga sebesar 8,25% per tahun.  
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  kredit  dana  talangan  tanah  CCT  ke  2018  the  balance  of  a  credit  facility  for 
PT Bank  Rakyat  Indonesia  (Persero)  Tbk  masing- land  bailouts  CCT  to  PT  Bank  Rakyat 
masing sebesar Rp 3.318.868.026.951 dan Nihil.  Indonesia  (Persero)  Tbk  amounted 
to Rp 3,318,868,026,951 and Nil, respectively. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018 saldo kredit investasi CCT ke PT Bank Rakyat  2018  the  balance  of  investment  credit  of 
Indonesia  (Persero)  Tbk  masing-masing  sebesar  CCT  to  PT  Bank  Rakyat  Indonesia  (Persero) 
Rp 31.601.199.493 dan Rp 1.557.374.275.217.  Tbk  amounted  to  Rp 31,601,199,493  and 
Rp 1,557,374,275,217, respectively. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018 saldo kredit IDC dari CCT ke PT Bank Rakyat  2018 the balance of IDC investment of CCT to 
Indonesia  (Persero)  Tbk  masing-masing  sebesar  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
Rp 1.907.441.804 dan Nihil.  amounted  to  Rp 1,907,441,804  and  Nil, 
respectively. 
   
d.  Perjanjian Kredit dan Fasilitas Kredit WBW  d.  Loan Agreement and Loan Facilitie WBW 
   
Berdasarkan  keterangan  Notaris  Ariani  L.  Rachim,  Based  on  the  statement  of  Notary  Ariani  L. 
SH No 23/ALR/NOT/XII/2018 tanggal 21 Desember  Rachim,  SH  No.  23/ALR/NOT/XII/2018  
2018  dan  keputusan  Kredit  Pembiayaan  Sindikasi  dated December 21, 2018 and the Syndicated 
WBW  No.  SDK/2.2/3618  tanggal  21  Desember  Financing  Credit  decision  WBW  
2018,  No.  1236/SJK/SDK/12/2018  tanggal   No.  SDK/2.2/3618  dated  December  21,  2018, 
21  Desember  2018,  No.  O64/S/CSAD/XII/2018  No.  1236/SJK/SDK/12/2018  dated  December 
tanggal  10  Desember  2018  dan  No.  S-1053/  SMI/  21,  2018,  No.O64/S/CSAD/XII/2018  dated 
DPI/1218  tanggal  21  Desember  2018,  WBW  telah  December  10,  2018  and  No.  S-1053/SMI/ 
menandatangani perjanjian Kredit Sindikasi dengan  DPI/1218  dated    December  21,  2018,  WBW 
PT Bank Negara Indonesia (Persero) Tbk, PT Bank  entered  into  Loan  Syndication  with  PT  Bank 
Rakyat  Indonesia  (Persero)  Tbk,  PT  Sarana  Multi  Negara  Indonesia  (Persero)  Tbk,  PT  Bank 
Infrastruktur, PT Bank Pembangunan Daerah Jawa   Rakyat  Indonesia  (Persero)  Tbk,  PT  Bank 
Timur, PT Bank Pembangunan Daerah Riau Kepri,  CIMB  Niaga  Tbk,  PT  Sarana  Multi 
PT  Bank  Pembangunan  Daerah  Nusa  Tenggara  Infrastruktur,  PT  Bank  Pembangunan  Daerah  
Timur, PT Bank Pembangunan Daerah Maluku dan  Jawa  Timur,  PT  Bank  Pembangunan  Daerah 
Maluku  Utara,  PT  Bank  Pembangunan  Daerah  Riau  Kepri,  PT  Bank  Pembangunan  Daerah 
Kalimantan  Selatan,  PT  Bank  Pembangunan  Nusa  Tenggara  Timur,  PT  Bank 
Daerah  Sumatera  Selatan  dan  Bangka  Belitung,   Pembangunan  Daerah  Maluku  dan  Maluku 
PT  Bank  Pembangunan  Daerah  Kalimantan   Utara,  PT  Bank  Pembangunan  Daerah 
Barat,  PT  Bank  Pembangunan  Daerah  Bengkulu,  Kalimantan  Selatan,  PT  Bank  Pembangunan 
PT  Bank  Pembangunan  Daerah  Bali,   Daerah  Sumatera  Selatan  dan  Bangka 
PT  Pembangunan  Daerah  Bank  Papua,  PT  Bank  Belitung,  PT  Bank  Pembangunan  Daerah 
CIMB  Niaga  Tbk  Unit  Syariah,  dan  PT  Bank  Kalimantan  Barat,  PT  Bank  Pembangunan 
Pembangunan  Daerah  Jawa  Timur  Unit  Syariah.  Daerah  Bengkulu,  PT   Bank  Pembangunan 
Sesuai  keputusan  Kreditur  Sindikasi  untuk  Daerah  Bali,  PT  Pembangunan  Daerah  Bank 
partisipasi  dalam  pembiayaan  sindikasi  WBW   Papua,  PT  Bank  CIMB  Niaga  Tbk  Unit 
untuk  keperluan  Kredit  Investasi  pembiayaan  Syariah,  dan  PT  Bank  Pembangunan  Daerah 
pembangunan dengan limit  fasilitas kredit investasi  Jawa  Timur  Unit  Syariah.  In  accordance  with 
sebesar  Rp  5.360.084.000.000  dengan  jangka   the  decision  of  the  Syndicated  Creditors  for 
   

174
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
waktu  maksimum  180  bulan  sejak  Penandatangan  participation  in  syndicated  financing  of  
Perjanjian  Kredit  termasuk  Grace  Period  dengan  PT  Waskita  Bumi  Wira  for  Credit  purposes 
suku  bunga  masa  konstruksi  adalah  Reference  Development  financing  investment  with  an 
Rate +. investment  credit  facility  limit  of 
Rp 5,360,084,000,000 with a maximum period 
of  180  months  from  the  Signing  of  the  Credit 
Agreement including the Grace Period with the 
construction  interest  rate  is  the  Reference 
Rate +.
   
Margin  eqv  10,50%  untuk  Tranche  1A  dan  1B  Margin  eqv  10.50%  for  Tranche  1A  and  1B 
dan  Reference  Rate  +  Margin  eqv  11,50%  and  Reference  Rate  +  Margin  eqv 11.50%  for 
untuk Tranche 1C dan 1D.  Tranche 1C and 1D. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  kredit  investasi  WBW  ke  PT Bank  2018 the balance of investment credit of WBW 
Rakyat  Indonesia  (Persero)  Tbk  masing-masing  to  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
sebesar Rp 157.966.660.065 dan Nihil.  amounted  to  Rp 157,966,660,065  and  Nil, 
respectively. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018 saldo kredit IDC dari WBW ke PT Bank Rakyat  2018 the balance of IDC investment of WBW to 
Indonesia  (Persero)  Tbk  masing-masing  sebesar  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
Rp 6.544.348.314 dan Nihil.  amounted  to  Rp 6,544,348,314  and  Nil, 
respectively. 
   
e.  Perjanjian Kredit dan Fasilitas Kredit CTP  e.  Loan Agreement and Loan Facilitie CTP 
   
Berdasarkan  perjanjian  dengan  sindikasi  bank  Based  on  agreement  with  bank  syndication 
No.  45  tanggal  21  Desember  2018  yang  telah  No.  45  dated  December  21,  2018  which  was 
dinotariskan oleh Ny. Ariani L. Rachim, S.H., notaris  notarized  by  Mrs.  Ariani  L.  Rachim,  S.H., 
di  Jakarta.  CTP  mendapatkan  pinjaman  kredit  notary  in  Jakarta.  CTP  obtained  investment 
investasi  untuk  proyek  jalan  tol  Cibitung-Cilincing  credit  for  Cibitung-Cilincing  toll  project  for  a 
dengan batas maksimal Rp 7.404.162.000.000.  maximum loan of Rp 7,404,162,000,000. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018, saldo kredit investasi CTP ke PT Bank Rakyat  2018  the  balance  of  investment  credit  of  CTP 
Indonesia  (Persero)  Tbk  masing-masing  sebesar  to  PT  Bank  Rakyat  Indonesia  (Persero)  Tbk 
Rp 2.327.114.201.067 dan Nihil.  amounted  to  Rp 2,327,114,201,067  and  Nil, 
respectively. 
   
3. PT Bank Tabungan Negara (Persero) Tbk 3. PT Bank Tabungan Negara (Persero) Tbk
 
Berdasarkan  Akta  notaris  H.  Bambang  Suprianto,  Based  on  Notarial  deed  No.  49  and  50  of  H. 
S.H.,  SpN.,  M.H  No.  49  dan 50  tanggal  30  Agustus  Bambang  Suprianto,  S.H.,  SpN.,  M.H,  dated 
2018,  WBW  mendapatkan  Fasilitas  Pinjaman  August 30, 2018, WBW has signed a financing 
dari  PT  Bank  Tabungan  Negara  (Persero)  Tbk  agreement  with  PT  Bank  Tabungan  Negara 
dengan  memberikan  fasilitas  kredit  sebesar  (Persero)  Tbk  with  provided  a  credit  working 
Rp  400.000.000.000  dengan  maksimum  kredit  capital  loan  of  Rp  400,000,000,000  with 
sebesar  Rp  1.125.000.000.000.  Fasilitas  pinjaman  maximum  credit  of  Rp  1,125,000,000,000. 
ini  diberikan  untuk  dana  talangan  pembebasan  The purpose of  this credit is for bailout of land 
tanah.  Jangka  waktu  fasilitas  kredit  terhitung  sejak  acqusition.  The  credit  has  a  credit  term  until 
ditandatanganinya  akta  perjanjian  kredit  sampai  August  2020  with  interest  rate  of  8.25% 
dengan  Agustus  2020  dengan  tingkat  suku  bunga  per annum. 
sebesar 8,25% per tahun. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  jangka  panjang  WBW  ke  2018  the  balance  of  long-term  loan  WBW  to 
PT  Bank  Tabungan  Negara  (Persero)  Tbk.  masing- PT  Bank  Tabungan  Negara  (Persero)  Tbk. 
masing  sebesar  Rp  220.042.926.255  dan  amounted  to  Rp  220,042,926,255  and 
Rp 94.580.673.879.  Rp 94,580,673,879, respectively. 

175
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
4. PT Bank BNI Syariah 4. PT Bank BNI Syariah
 
Berdasarkan  Akta  notaris  Ariani  Lakhsmijati    Based  on  Notarial  deed  No.  37  of  Ariani 
Rachim, S.H., No. 37 tanggal 24 Mei 2017 dan Akta  Lakhsmijati Rachim S.H., dated May 24, 2017 
notaris  Ariani  Lakhsmijati  Rachim,  S.H.,  No.  48  and Notarial deed No. 48 of Ariani Lakhsmijati 
tanggal  27  Agustus  2018,  PT  PBTR  telah  Rachim  S.H.,  dated  August  27,  2018,    
menandatangani perjanjian Kredit Sindikasi dengan  PT  PBTR  entered  into  a  syndicated  Loan 
PT Bank Negara Indonesia (Persero) Tbk, PT Bank  Agreement  with  PT  Bank  Negara  Indonesia 
Panin  Tbk,  PT  Bank  Papua,  PT  Bank  (Persero)  Tbk,  PT  Bank  Panin  Tbk,  PT  Bank 
Pembangunan  Daerah  Sulawesi  Selatan  dan  Papua,  PT  Bank  Pembangunan  Daerah 
Sulawesi  Barat,  PT  Bank  Arta  Graha  Internasional  Sulawesi  Selatan  dan  Sulawesi  Barat,                  
Tbk,  PT  Bank  Pembangunan  Daerah  Maluku  dan  PT  Bank  Arta  Graha  Internasional  Tbk,    
Maluku  Utara,  PT  Bank  Pembangunan  Daerah  PT  Bank  Pembangunan  Daerah  Maluku  dan 
Daerah  Istimewa  Yogyakarta,  PT  Bank  Maluku Utara, PT Bank Pembangunan Daerah 
Pembangunan  Daerah  Jambi,  PT  Bank  Nagari,  Daerah  Istimewa  Yogyakarta,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Kalimantan  Pembangunan  Daerah  Jambi,  PT  Bank 
Tengah,  PT  Bank  Pembangunan  Daerah  Bali,  Nagari,  PT  Bank  Pembangunan  Daerah 
PT  Bank  Pembangunan  Daerah  Sumatera  Utara,  Kalimantan  Tengah,  PT  Bank  Pembangunan 
PT  Bank  Pembangunan  Daerah  Jawa  Tengah,  Daerah  Bali,  PT  Bank  Pembangunan  Daerah 
PT  Bank  BNI  Syariah,  PT  Bank  Jabar  Banten  Sumatera  Utara,  PT  Bank  Pembangunan 
Syariah,  PT  Bank  Aceh  Syariah,  PT  Indonesia  Daerah  Jawa  Tengah,  PT  Bank  BNI  Syariah, 
Infrastructure  Finance,  PT  Bank  Riau  Kepri,  PT Bank Jabar Banten Syariah, PT Bank Aceh 
PT  Bank  Sumsel  Babel,  PT  Pembangunan  Daerah  Syariah,  PT  Indonesia  Infrastructure  Finance, 
Kalimantan  Selatan,  PT  Pembangunan  Daerah  PT  Bank  Riau  Kepri,  PT  Bank  Sumsel  Babel,  
Sulawesi  Tengah,  PT  Bank  Pembangunan  Daerah  PT  Pembangunan  Daerah  Kalimantan 
Istimewa  Yogyakarta  Syariah,  PT  Bank  Riau  Kepri  Selatan,  PT  Pembangunan  Daerah  Sulawesi 
Syariah dan PT Bank Kalsel Syariah.  Tengah,  PT  Bank  Pembangunan  Daerah 
Istimewa  Yogyakarta  Syariah,  PT  Bank  Riau 
Kepri Syariah dan PT Bank Kalsel Syariah. 
     
Keduapuluh  empat  bank  tersebut  memberikan    These  twenty  four  banks  provided  a                   
fasilitas  kredit  maksimum  sebesar           credit  facility  with  a  maximum  credit  facility 
Rp  5.248.541.000.000  yang  terdiri  dari  Kredit  limit  of  Rp  5,248,541,000,000  which               
Investasi  dan  Kredit  Bunga  masa  Konstruksi  (IDC)  consists  of  Investment  Credit  and                    
masing-masing sebesar  Rp  4.919.070.000.000  dan  Interest  During  Construction  (IDC)   
Rp  329.471.000.000.  Kedua  fasilitas  tersebut  amounted  to  Rp  4,919,070,000,000  and             
diberikan  untuk  keperluan  pembangunan  Jalan  Tol  Rp  329,471,000,000,  respectively.  Both 
Ruas Pemalang – Batang.  facilities  are  provided  for  the  development  of 
Pemalang - Batang Toll Road. 

Jangka  waktu  kredit  investasi  dan  IDC  adalah  162  The  investment  credit  and  IDC  have  a  credit 
bulan  atau  14  tahun  termasuk  masa  tenggang  24  term loan of 162 months or 14 years including 
bulan  atau  2  tahun  sejak  tanggal  efektif.  Suku  a  grace  period  of  24  months  or  2  years  from 
bunga  adalah  rata-rata  tertimbang  atas  dasar  suku  the effective date. The interest rate of this loan 
bunga  yaitu  Reference  Rate  (LPS)  ditambah  is  weighted  average  interest  rate  based  on  
dengan  Margin  atau  setara  dengan  10,5%  per  the  Reference  Rate  (LPS)  plus  Margin  or 
tahun.  equivalent to 10.5% per annum. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30, 2019 and  December  31, 
2018  jumlah  yang  terhutang  kepada  PT  Bank  BNI  2018, the outstanding amount to PT Bank BNI 
Syariah  adalah  sebesar  Rp  241.223.825.001  dan  Syariah amounted to Rp 241,223,825,001 and 
Nihil.  Nil, respectively. 

176
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
5. PT Bank BRIsyariah Tbk 5. PT Bank BRIsyariah Tbk

Berdasarkan  Akta  Notaris  Ariani  Lakhsmijati    Based  on  Notarial  Deed  No.  117  of  Ariani 
Rachim, S.H., No. 117 tanggal 24 April 2019, CCT  Lakhsmijati Rachim S.H., dated April 24 2019, 
telah  menadatangani  perjanjian  Kredit  Sindikasi  CCT  entered  into  Loan  Syndication  with  
dengan  PT  Bank  Negara  Indonesia,   PT  Bank  Negara  Indonesia,  PT  Bank  Rakyat 
PT  Bank  Rakyat  Indonesia,  PT  Bank  Panin,   Indonesia,  PT  Bank  Panin,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Jawa  Timur,   Pembangunan  Daerah  Jawa  Timur,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Sumatera  Barat,  Pembangunan  Daerah  Sumatera  Barat,  
PT  Bank  Pembangunan  Daerah  Nusa  Tenggara  PT  Bank  Pembangunan  Daerah  Nusa 
Timur,  PT  Bank  Pembangunan  Daerah  Jawa  Tenggara  Timur,  PT  Bank  Pembangunan 
Tengah,  PT  Bank  Pembangunan  Daerah  Bali,   Daerah Jawa Tengah, PT Bank Pembangunan 
PT  Bank  Pembangunan  Daerah  Papua,  PT  Bank  Daerah  Bali,  PT  Bank  Pembangunan  Daerah 
Pembangunan  Daerah  Kalimantan  Selatan,   Papua,  PT  Bank  Pembangunan  Daerah 
PT  Bank  Pembangunan  Daerah  Kalimantan  Timur  Kalimantan  Selatan,  PT  Bank  Pembangunan 
dan  Kalimantan  Utara,  PT  Bank  Pembangunan  Daerah  Kalimantan  Timur  and  Kalimantan 
Daerah Maluku dan Maluku Utara, PT Bank Negara  Utara, PT Bank Pembangunan Daerah Maluku 
Indonesia  Syariah,  PT  Bank  Rakyat  Indonesia  dan Maluku Utara, PT Bank Negara Indonesia 
Syariah, PT BPD Kalimantan Timur dan Kalimantan  Syariah,  PT  Bank  Rakyat  Indonesia  Syariah, 
Utara  unit  usaha  Syariah,  PT  Bank  Panin  Dubai  PT  BPD  Kalimantan  Timur  and  Kalimantan 
Syariah,  PT  BPD  Jawa  Timur  unit  usaha  Syariah,  Utara  Syariah,  PT  Bank  Panin  Dubai  Syariah, 
PT  BPD  Kalimantan  Selatan  unit  usaha  Syariah,   PT  BPD  Jawa  Timur  Syariah,  PT  BPD 
PT  BPD  Sumatera  Selatan  Dan  Bangka  Belitung  Kalimatan Selatan Syariah, PT BPD Sumatera 
Unit  Usaha  Syariah,  PT  BPD  Jawa  Barat  dan  Selatan  and  Bangka  Belitung,  PT  BPD  Jawa 
Banten  Syariah.  Kedua  puluh  satu  bank  tersebut  Barat  and  Banten  Syariah.  These  twenty  one 
memberikan  fasilitas  kredit  maksimum  sebesar   banks  are  providing  a  credit  facility  with  a 
Rp  5.350.000.000.000  yang  terdiri  dari  Kredit  credit  ceiling  of  Rp  5,350,000,000,000  which 
Investasi  dan  kredit  bunga  masa  konstruksi  consists  of  investment  during  construction  
masing-masing sebesar Rp 4.831.095.463.734 dan  amounted  to  Rp  4,831,095,463,734  and  
Rp  518.904.536.266.  Kedua  fasilitas  tersebut  Rp  518,904,536,266.  Both  facilities  are 
diberikan  untuk  keperluan pembangunan  Jalan  Tol  provided  for  the  development  of  Cimanggis-
Ruas Cimanggis-Cibitung.  Cibitung. 
     
Jangka  waktu  Kredit  Investasi  dan  Kredit  Interest    The  investment  credit  and  interest  during 
During  Construction  (IDC)  adalah  180  bulan  constructin  credit    term  loan  was  180  months 
termasuk  masa  tenggang  36  bulan  sejak  tanggal  or  36  months  including  a  grace  period  of  36 
efektif. Suku bunga yang dikenakan adalah sebesar  months  from  the  effective  date.  The  interest 
reference  rate  (ATD)  ditambah  dengan  Margin  rate  of  this  loan  is  reference  rate  (ATD)  plus 
4,625% selama masa konstruksi dan 4,375% masa  margin  4,625%  during  construction  and 
operasi.  4,375% during operation. 
     
Pada  tanggal  30  September  2019  dan   As  of September 30, 2019 and December 31, 
31  Desember  2018 saldo  pinjaman  kredit  investasi  2018  the  balance  of  CCT  investment  credit 
CCT  ke  PT  Bank  BRIsyariah  Tbk  masing-masing  loan to  PT Bank BRIsyariah Tbk amounted to 
sebesar Rp 17.082.743.827 dan Nihil.  Rp 17,082,743,827 and Nil, respectively.  

Entitas Anak – WKR  Subsidiary – WKR 

PT Bank Tabungan Negara (Persero) Tbk. PT Bank Tabungan Negara (Persero) Tbk.
 
Pada  tanggal  20  Oktober  2017,  Perusahaan  On  October  20,  2017,  the  Company  entered 
menandatangani  kontrak  perjanjian  No.  8  dengan  contract  agreement  No.  8  with  PT  Bank  Tabungan 
PT  Bank  Tabungan  Negara  (Persero)  Tbk  terkait  Negara  (Persero)  Tbk  related  to  loan  facility 
dengan fasilitas pinjaman sebesar Rp 300.000.000.000.  amounting to  Rp 300,000,000,000.  This loan facility 
Fasilitas  pinjaman  ini  hanya  dapat  digunakan  untuk  will  be  used  specifically  for  the  construction  of 
pembiayaan  konstruksi  hardcost  pembangunan  SOHO  hardcost  development  of  SOHO  and  apartment  88, 
dan  apartemen  88  Avenue,  proyek  KSO  Waskita  –  avenue,  owned  by  KSO  Waskita  –  Darmo,  in 
Darmo, di Surabaya. Saldo pokok terutang dari fasilitas  Surabaya. The outstanding principal balance of loan 
ini  pada  31  Oktober  2018  adalah  sebesar  facilities  as  of  October  31,  2018  amounted  to 
Rp  120.000.000.000  dengan  jangka  waktu  penarikan  Rp  120,000,000,000  with  term  of  withdrawal  60 
fasilitas  pinjaman  adalah  60  bulan  setelah  months  after  signing  contract  with  interest  rate  of 
penandatanganan  kontrak  perjanjian  dengan  tingkat  9.5% per annum. 
suku bunga 9,5% per tahun. 

177
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Fasilitas  ini  mensyaratkan  Perseroan  untuk  These  facilities  require  the  Company  to  maintain 
memelihara  rasio  keuangan  tertentu.  Pada  tanggal  financial ratio. As of October 31, 2018, the Company 
31  Oktober  2018,  Perseroan  telah  memenuhi  rasio  is in compliance with financial covenants required by 
keuangan yang dipersyaratkan oleh bank.  bank. 
   
Pada  tanggal  18  Desember  2017,  Perusahaan  On  December  18,  2017,  the  Company  entered 
menandatangani  kontrak  perjanjian  No.  28  dengan  contract agreement No. 28 with PT Bank Tabungan 
PT  Bank  Tabungan  Negara  (Persero)  Tbk  terkait  Negara  (Persero)  Tbk  related  to  loan  facility 
dengan fasilitas pinjaman sebesar Rp 340.000.000.000.  amounting to  Rp 340,000,000,000. This loan facility 
Fasilitas  pinjaman  ini  hanya  dapat  digunakan  untuk  will  be  used  specifically  for  the  construction  of  610 
pembiayaan  konstruksi  pembangunan  610  unit  units of apartment in The Reiz Condo Project owned 
apartemen  di  proyek  The  Reiz  Condo  PT  Waskita  PT  Waskita  Karya  Realty,  in  Medan. 
Karya  Realty,  di  Medan.  Saldo  pokok  terutang  dari  The  outstanding  principal  balance  amounted 
fasilitas ini sebesar Rp 340.000.000.000 dengan jangka  Rp  340,000,000,000  with  term  of  withdrawal  60 
waktu  penarikan  fasilitas  pinjaman  adalah  60  bulan  months  after  signing  contract  with  interest  rate  of 
setelah  penandatanganan  kontrak  perjanjian  dengan  9.0 % per annum. 
tingkat suku bunga 9,0 % per tahun. 
   
Perjanjian  kredit  ini  dijamin  dengan:  (i)  tanah  seluas  This credit facilities is secured by: (i) land measuring 
11.500 m2 dan bangunan yang ada dan yang akan ada  11,500 sqm and buiding upon the land which come 
di  atasnya  yang  merupakan  hasil  pecah  sertifikat  from  dividing  the  certificate  from  SHGB 
dari  SHGB  No.  1855/Sonokwijenan  atas  nama  No.  1855/Sonokwijenan  with  name  PT  Darmo 
PT  Darmo  Permai  seluas  21.370  m2  dan  SHGB  Permai  measuring  21,370  sqm  and  SHGB 
No.  2376/Sonokwijenan  atas  nama  PT Darmo  Permai  No. 2376/Sonokwijenan  with  name  PT Darmo 
seluas  1.449  m2,  (ii)  legalitas  objek  bangunan  Permai  measuring  1,449  sqm,  (ii)  legality  of  object 
merupakan  hasil  penggabungan,  balik  nama                 comes from merging land, and owned to PT Waskita 
PT Waskita Karya Realty dan PT Darmo Permai, serta  Karya  Realty  and  PT Darmo  Permai,  and  also 
pemecahan  berdasarkan  tahap  pembangunan  proyek  separated  land  based  on  project  construction  plan 
(Catatan 16). (Notes 16). 
   
Pada  tanggal  30  September  2019  dan  31  Desember  As of September 30, 2019 and December 31, 2018, 
2018 saldo pinjaman jangka panjang WKR ke PT Bank  the  balance  of  long-term  loan  WKR  to  PT  Bank 
Tabungan  Negara  (Persero)  Tbk.  masing-masing  Tabungan  Negara  (Persero)  Tbk.  amounted  to 
sebesar Rp 510.473.000.000 dan Rp 460.000.000.000.  Rp  510,473,000,000  and  Rp  460,000,000,000, 
respectively. 
   
Pihak Ketiga Third Parties
Perusahaan The Company

1. Sindikasi Modal Kerja PT Bank BTPN Tbk (d/h 1. Working Capital Syndication purposes of
PT Bank Sumitomo Mitsui Indonesia) PT Bank BTPN Tbk (formerly PT Bank
Sumitomo Mitsui Indonesia)
   
Berdasarkan  Perjanjian  Kredit  Sindikasi  tanggal  Based  on  Syndicated  Credit  Agreement  dated 
18 September  2017,  Perusahaan  memperoleh  September 18, 2017, the Company obtained a 
fasilitas  kredit  sindikasi  untuk  Modal  Kerja  umum  syndicated  credit  facility  for  the  General 
dari  PT  Bank  BTPN  Tbk,  Bank  of  China  (Hong  Working  Capital  of  PT  Bank  BTPN  Tbk,  Bank 
Kong)  Limited  Jakarta  Branch,  PT Bank  KEB  Hana  of  China  (Hong  Kong)  Limited  Jakarta  Branch, 
Indonesia,  PT Bank Permata, Tbk., PT Bank OCBC  PT  Bank  KEB  Hana  Indonesia,  PT  Bank 
NISP  Tbk.,  PT  Bank  China  Construction  Bank  Permata,  Tbk.,  PT  Bank  OCBC  NISP  Tbk., 
Indonesia, Tbk., PT Bank CTBC Indonesia, PT Bank  PT  Bank  China  Construction  Bank  Indonesia, 
Shinhan Indonesia, PT Bank SBI Indonesia sebesar  Tbk.,  PT  Bank  CTBC  Indonesia,  PT Bank 
maksimum Rp 5.000.000.000.000.  Fasilitas tersebut  Shinhan Indonesia, PT Bank SBI Indonesia for 
memiliki  jangka  waktu  5  tahun  dari  tanggal  a  maximum  of  Rp 5,000,000,000,000. 
perjanjian,  dan  grace  period  2  tahun  dari  tanggal  The  facility  has  a  term  of  5  years  from 
perjanjian, dengan tingkat bunga 1M JIBOR + 2,77%  the  agreement  date,  and  a  grace  period  of  2 
per tahun.   years  from  agreement  date,  with  an  interest 
rate of 1M JIBOR + 2.77% per annum. 
   

178
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pinjaman  ini  dijamin  dengan  tagihan  kepada  These  loans  are  collateralized  by  amount  due 
pengguna jasa atas proyek Jalan Tol Kayu Agung -  from  customers  of  Kayu  Agung  -  Palembang  - 
Palembang - Betung II Seksi 2 & 3, proyek Bandara  Betung  II  Toll  Road  project  Section  2  &  3, 
Achmad  Yani  Semarang,  proyek  Bendungan  Temef  Achmad  Yani  Semarang  Airports  project, 
NTT,  proyek  Universitas  Negeri  Yogyakarta,  Temef  NTT  Dam  project,  Universitas  Negeri 
Pembangunan  Gedung  Rektorat,  Gedung  Fakultas  Yogyakarta  Project,  Construction  of 
&  Kawasan  3  Pilar  Kampus  Universitas  Islam  the Rectorate Building, Faculty & Area Building 
Internasional  Indonesia  (UIII)  Paket  I,  dan  proyek  3  Campus  Pillars  of  the  Islam  Internasional 
Bendungan Marga Tiga (Catatan 5).  Indonesia  University  (UIII)  Package  I,  and 
Marga Tiga Dam project (Note 5). 
   
Perusahaan  diwajibkan  untuk  mempertahankan  The  Company  is  required  to  maintain        
rasio keuangan sebagai berikut:   the following financial ratios: 
-  Debt to equity ratio maksimum 3 kali;   -  Debt to equity ratio maximum 3 times; 
-  Debt Service Coverage Ratio minimal 1 kali;  -  Debt  Service  Coverage  Ratio  at  least  1 
  time; 
-  Current ratio minimal 100%.   -  Current ratio is at least 100%. 
   
Pemenuhan  pembatasan  pinjaman  bank  dilaporkan  The fullfilment of bank lending restriction will be 
oleh  Perusahaan  setiap  akhir  tahun  dan  akan  reported by the Company at the end of the year 
dievaluasi oleh bank.  and will be evaluated by the bank. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  Perusahaan  kepada  PT  Bank  2018 the  Company's  loan  balance  to  PT  Bank 
BTPN  Tbk  adalah  masing-masing  sebesar  BTPN Tbk amounted to Rp 1,102,500,000,000; 
Rp  1.102.500.000.000;  PT  Bank  of  China  Ltd  PT  Bank  of  China  Ltd  amounted  to 
sebesar Rp 1.102.500.000.000; PT Bank KEB Hana  Rp 1,102,500,000,000;  PT  Bank  KEB  Hana 
Indonesia  sebesar  Rp  450.000.000.000;  Indonesia  amounted  to  Rp  450,000,000,000; 
PT Bank Permata Tbk sebesar Rp 450.000.000.000;  PT  Bank  Permata  Tbk  amounted  to 
PT  Bank  OCBC  NISP  Tbk  sebesar  Rp  450,000,000,000;  PT  Bank  OCBC  NISP 
Rp  446.638.390.058  dan  Rp  450.000.000.000;  Tbk  amounted  to  Rp  446,638,390,058  and 
PT  Bank  China  Construction  Bank  Indonesia  Tbk  Rp  450,000,000,000;  PT Bank  China 
sebesar  Rp 360.000.000.000;  PT  Bank  Chinatrust  Construction Bank Indonesia Tbk amounted to 
Indonesia sebesar Rp 270.000.000.000; PT Shinhan  Rp 360,000,000,000;  PT  Bank  Chinatrust 
Bank  Indonesia  sebesar  Rp  180.000.000.000;  Indonesia  amounted  to  Rp  270,000,000,000; 
PT  Bank  SBI  Indonesia  sebesar  PT Shinhan  Bank  Indonesia  amounted  to 
Rp 135.000.000.000.  Rp  180,000,000,000;  PT  Bank  SBI  Indonesia 
amounted to Rp 135,000,000,000. 
   
Pada  tanggal  31  Desember  2018  terdapat  saldo  As  of  December  31,  2018,  the  Company's 
pinjaman  Perusahaan  yang  jatuh  tempo  dalam  current  portion  of  long  term  loan  balance  to 
setahun  kepada  PT  Bank  BTPN  Tbk  sebesar  PT  Bank  BTPN  Tbk  amounted  to 
Rp  102.042.500.000;  PT  Bank  of  China  Ltd  Rp  102,042,500,000;  PT  Bank  of  China  Ltd 
Rp 102.042.500.000; PT Bank KEB Hana Indonesia  Rp 102,042,500,000;  PT  Bank  KEB  Hana 
Rp  41.650.000.000;  PT  Bank  Permata  Tbk  Indonesia  Rp  41,650,000,000;  PT  Bank 
Rp  41.650.000.000;  PT  Bank  OCBC  NISP  Tbk  Permata  Tbk  Rp  41,650,000,000;  PT  Bank 
Rp  41.650.000.000;  PT  Bank  China  Construction  OCBC NISP Tbk Rp 41,650,000,000; PT Bank 
Bank  Indonesia  Tbk  Rp 33.320.000.000;  PT  Bank  China  Construction  Bank  Indonesia  Tbk 
Chinatrust  Indonesia  Rp  24.990.000.000;  Rp 33,320,000,000;  PT  Bank  Chinatrust 
PT  Shinhan  Bank  Indonesia  Rp  16.660.000.000;  Indonesia  Rp  24,990,000,000;  PT Shinhan 
PT  Bank  SBI  Indonesia  Rp 12.495.000.000.  Total  Bank  Indonesia  Rp  16,660,000,000;  PT  Bank 
seluruh saldo pinjaman adalah Rp 416.500.000.000.   SBI  Indonesia  Rp  12,495,000,000.  The  total 
loan balance is Rp 416,500,000,000.  

179
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
2. Sindikasi Modal Kerja PT Bank BTPN Tbk (d/h 2. Working Capital Syndication purposes of
PT Bank Sumitomo Mitsui Indonesia) PT Bank BTPN Tbk (formerly PT Bank
Sumitomo Mitsui Indonesia)
   
Berdasarkan  Perjanjian  Kredit  Sindikasi  tanggal  Based  on  Syndicated  Credit  Agreement  dated 
27  Nopember  2018,  Perusahaan  memperoleh  November  27,  2018,  the  Company  obtained  a 
fasilitas  kredit  sindikasi  untuk  Modal  Kerja  umum  syndicated  credit  facility  for  the  General 
dari  PT  Bank  BTPN  Tbk,  PT  Bank  Permata  Tbk,  Working  Capital  of  PT  Bank  BTPN  Tbk, 
PT  Bank  Shinhan  Indonesia,  dan  PT  Bank  Resona  PT  Bank  Permata  Tbk,  PT Bank  Shinhan 
Perdania  Indonesia  sebesar  maksimum  Indonesia,  and  PT  Bank  Resona  Perdania 
Rp 2.350.000.000.000.  Fasilitas  tersebut  memiliki  Indonesia  for  a  maximum  of 
jangka  waktu  5  tahun  dari  tanggal  perjanjian,  dan  Rp 2,350,000,000,000.  The  facility  has  a  term 
grace  period  21  bulan  dari  tanggal  perjanjian,  of  5  years  from  the  agreement  date,  and  a 
dengan  tingkat  bunga  1M  JIBOR  +  2,50  %  per  grace  period  of  21  months  from  agreement 
tahun.  date,  with  an  interest  rate  of  1M  JIBOR  + 
2.50% per annum. 
   
Pinjaman  ini  dijamin  dengan  tagihan  kepada  These  loans  are  collateralized  by  amount  due 
pengguna  jasa  atas  proyek  Pembangunan  Proyek  from  customer  of  the  construction  of 
Jalan  Tol  Tebing  Tinggi–  Parapat  (Tahap  1)  Ruas  the  Tebing  Tinggi  –  Parapat  (Stage  1)  Tebing 
Tebing  Tinggi  –  Serbelawan  termasuk  Simpang  Tinggi  –  Serbelawan  include  Simpang  Susun 
Susun Serbelawan dan Pembangunan Proyek Nines  Serbelawan  Toll  Road  and  Construction  of 
Plaza dan Residence (Catatan 5).   Nines Plaza and Residence Project (Note 5). 
   
Perusahaan  diwajibkan  untuk  mempertahankan  The  Company  is  required  to  maintain            
rasio keuangan sebagai berikut:   the following financial ratios: 
-  Debt to equity ratio maksimum 3 kali;   -  Debt to equity ratio maximum 3 times; 
-  Debt Service Coverage Ratio minimal 1 kali;  -  Debt  Service  Coverage  Ratio  at  least 
  1 time; 
-  Current ratio minimal 100%.   -  Current ratio is at least 100%. 
   
Pemenuhan  pembatasan  pinjaman  bank  dilaporkan  The fullfilment of bank lending restriction will be 
oleh  Perusahaan  setiap  akhir  tahun  dan  akan  reported by the Company at the end of the year 
dievaluasi oleh bank.  and will be evaluated by the bank. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  Perusahaan  kepada  PT  Bank  2018 the  Company's  loan  balance  to  PT  Bank 
BTPN  Tbk  adalah  sebesar  Rp  1.000.000.000.000  BTPN Tbk amounted to Rp 1,000,000,000,000 
dan  Rp  277.800.000.000;  PT  Bank  Permata  and  Rp  277,800,000,000;  PT  Bank  Permata 
Tbk  sebesar  Rp  500.000.000.000  dan  Tbk  amounted  to  Rp 500,000,000,000  and 
Rp  138.900.000.000;  PT  Bank  Resona  Perdania  Rp 138,900,000,000;  PT  Bank  Resona 
Indonesia  sebesar  Rp  200.000.000.000  dan  Perdania  Indonesia  amounted  to 
Rp  55.500.000.000;  PT  Bank  Shinhan  Rp  200,000,000,000  and  Rp  55,500,000,000;  
Indonesia  sebesar  Rp  150.000.000.000  dan  PT  Bank  Shinhan  Indonesia  amounted  to 
Rp  27.800.000.000;  dan  PT  Bank  QNB  Indonesia  Rp  150,000,000,000  and  Rp  27,800,000,000; 
sebesar Rp 500.000.000.00 dan Nihil.  and  PT  Bank  QNB  Indonesia  amounted  to 
Rp 500,000,000,000 and Nil. 
   
3. PT Bank CIMB Niaga Tbk – Unit Usaha Syariah 3. PT Bank CIMB Niaga Tbk – Syariah
Business Unit

Perusahaan  memperoleh  Fasilitas  Pembiayaan  The Company obtained a Financing Facilitiy of 


Transaksi  Khusus  Musyarakah  sebesar  Musyarakah  Special  Transaction  amounted 
Rp 500.000.000.000  sesuai  Surat  Perpanjangan  to  Rp 500,000,000,000  according  to 
Fasilitas  Pembiayaan  No.  038/OL/CBGII/II/19   Extension  Letter  of  Financing  Facility 
tanggal  12  Pebruari  2019.  Fasilitas  tersebut  dapat  No.  038/OL/CBGII/II/19  dated  February  12, 
digunakan hingga 20 Desember 2020.  2019.  The  facility  can  be  used  until 
December 20, 2020. 
   
Pinjaman  ini  dijamin  dengan  tagihan  kepada  These  loans  are  collateralized  with  all  amount 
pengguna jasa atas proyek Pembangunan Jalan Tol  due  from  customer  of  Kayu  Agung  – 
Kayu Agung – Palembang – Betung Paket  IV Seksi  Palembang  –  Betung  Toll  Road  Package  IV 
3B (Catatan 5).  Section 3B (Note 5). 
   

180
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perusahaan diwajibkan untuk mempertahankan debt  The Company should maintain interest bearing 
(ad. Interest bearing debt) to equity ratio maksimum  debt  to  equity  ratio  maximum  3  times,  interest 
3 kali, interest service coverage ratio minimal 1,5 kali  service coverage ratio mimimum 1.5 times and 
dan current ratio minimal 100%.  current ratio minimum 100%. 
   
Pemenuhan  pembatasan  pinjaman  bank  dilaporkan  The fullfilment of bank lending restriction will be 
oleh  Perusahaan  setiap  akhir  tahun  dan  akan  reported  by  the  Company  at  the  end  of 
dievaluasi oleh bank.  the year and will be evaluated by the bank. 
   
Pada tanggal 30 September 2019 dan 31 Desember  As  of  September  30,  2019  and  December  31, 
2018  saldo  pinjaman  Perusahaan  kepada  kepada  2018  the  balance  of  Company’s  loan  to 
PT  Bank  CIMB  Niaga  Tbk  –  Unit  Usaha  Syariah  PT  Bank  CIMB  Niaga  Tbk –  Syariah  Business 
masing-masing  sebesar  Rp  500.000.000.000  dan  Unit amounted to Rp 500,000,000,000 and Nil, 
Nihil.  respectively. 
   
Entitas Anak – WTR Subsidiary – WTR

Sindikasi Modal Kerja PT Waskita Bumi Wira Working Capital Syndication purposes of
PT Bumi Wira
 
Berdasarkan  keterangan  Notaris  Ariani  L.  Rachim,  SH  Based  on  the  statement  of  Notary  Ariani  L. 
No  23/ALR/NOT/XII/2018  tanggal  21  Desember  2018  Rachim,  SH  No.  23/ALR/NOT/XII/2018  dated 
dan  keputusan  Kredit  Pembiayaan  Sindikasi  December 21, 2018 and the Syndicated Financing 
PT  Waskita  Bumi  Wira  No.  SDK/2.2/3618  tanggal  Credit  decision  PT  Waskita  Bumi  Wira 
21  Desember  2018,  No.  1236/SJK/SDK/12/2018  No.  SDK/2.2/3618  dated  December  21,  2018, 
tanggal  21  Desember  2018,  No.  O64/S/CSAD/XII/2018  No.  1236/SJK/SDK/12/2018  dated  December  21, 
tanggal  10  Desember  2018  dan  No.  S-1053/SMI/  2018,  No.  O64/S/CSAD/XII/2018  dated  December 
DPI/1218  tanggal  21  Desember  2018,  PT  Waskita  10,  2018  and  No.  S-1053/SMI/DPI/1218 
Bumi  Wira  telah  menandatangani  perjanjian  dated    December  21,  2018,  PT  Waskita  Bumi 
Kredit  Sindikasi  dengan  PT  Bank  Negara  Indonesia  Wira  has  signed  a  Syndicated  Credit  agreement 
(Persero)  Tbk,  PT  Bank  Rakyat  Indonesia  with  PT  Bank  Negara  Indonesia  (Persero)  Tbk, 
(Persero) Tbk,  PT Sarana Multi Infrastruktur,  PT  Bank  PT    Bank    Rakyat    Indonesia    (Persero)   Tbk, 
Pembangunan  Daerah  Jawa  Timur,  PT  Bank  PT  Sarana  Multi  Infrastruktur,  PT  Bank 
Pembangunan  Daerah  Riau  Kepri,  PT  Bank  Pembangunan  Daerah  Jawa  Timur,  PT  Bank 
Pembangunan Daerah Nusa Tenggara Timur, PT Bank  Pembangunan  Daerah  Riau  Kepri,  PT  Bank 
Pembangunan  Daerah  Maluku  dan  Maluku  Utara,  Pembangunan  Daerah  Nusa  Tenggara  Timur, 
PT  Bank  Pembangunan  Daerah  Kalimantan  Selatan,  PT  Bank  Pembangunan  Daerah  Maluku  dan 
PT Bank Pembangunan Daerah Sumatera Selatan dan  Maluku  Utara,  PT  Bank  Pembangunan  Daerah 
Bangka  Belitung,  PT  Bank  Pembangunan  Daerah  Kalimantan  Selatan,  PT  Bank  Pembangunan 
Kalimantan  Barat,  PT  Bank  Pembangunan  Daerah  Daerah  Sumatera  Selatan  dan  Bangka  Belitung, 
Bengkulu,  PT  Bank  Pembangunan  Daerah  Bali,  PT Bank Pembangunan Daerah Kalimantan Barat, 
PT Bank Pembangunan Daerah Bank Papua, PT Bank  PT  Bank  Pembangunan  Daerah  Bengkulu, 
CIMB  Niaga  Tbk  Unit  Syariah,  dan  PT  Bank  PT  Bank  Pembangunan  Daerah  Bali,  PT  Bank 
Pembangunan  Daerah  Jawa  Timur  Unit  Syariah.  Pembangunan  Daerah  Bank  Papua,  PT  Bank 
PT  Waskita  Bumi  Wira  menerima  Sindikasi  Kredit,  CIMB  Niaga  Tbk  Unit  Syariah,  and  PT  Bank 
untuk  keperluan  pembiayaan  pembangunan  jalan  Pembangunan  Daerah  Jawa  Timur  Unit  Syariah. 
tol  dengan  maksimum  kredit  investasi  sebesar  PT  Waskita  Bumi  Wira  received  Credit 
Rp 5.360.084.000.000.   Syndication,  for  financing  the  construction  of    toll 
roads  with  a  maximum  investment  credit  of 
Rp 5,360,084,000,000. 

Jangka  waktu  maksimum  180  bulan  sejak  With  a  term  of  180  months and  on  the  Signing  of 
Penandatangan  Perjanjian  Kredit  termasuk  Grace  the  Credit  Agreement  including  the  Grace  Period 
Period  dengan  suku  bunga  masa  konstruksi  adalah  with the construction interest rate is the Reference 
Reference  Rate  +  Margin  eqv.  10,50%  untuk  Tranche  Rate + Margin eqv. 10.50% for Tranche 1A and 1B 
1A  dan  1B  dan  Reference  Rate  +  Margin  eqv.11,50%  and  Reference  Rate  +  Margin  eqv.  11.50%  for 
untuk Tranche 1C dan 1D.  Tranche 1C and 1D. 
   
Sindikasi Modal Kerja PT Pemalang Batang Toll Working Capital Syndication of PT Pemalang
Road Batang Toll Road

Berdasarkan  Akta  notaris  Ariani  Lakhsmijati  Rachim,    Based  on  notarial  deed  No.  37  of  Ariani 
S.H.,  No.  37  tanggal  24  Mei  2017  dan  akta  notaris  Lakhsmijati Rachim S.H., dated May 24, 2017 and 
Ariani  Lakhsmijati  Rachim,  S.H.,  No.  48  tanggal  Notarial deed No. 48 of Ariani Lakhsmijati Rachim 

181
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
27  Agustus  2018,  PT  PBTR  telah  menandatangani  S.H.,  dated  August  27,  2018,  PT  PBTR  entered 
perjanjian  Kredit  Sindikasi  dengan  PT  Bank  Negara  into a Syndicated Credit Agreement with PT Bank 
Indonesia  (Persero)  Tbk,  PT  Bank  Pan  Indonesia  Tbk,  Negara  Indonesia  (Persero)  Tbk,  PT  Bank  Pan 
PT  Bank  Papua,  PT  Bank  Pembangunan  Daerah  Indonesia  Tbk,  PT  Bank  Papua,  PT  Bank 
Sulawesi  Selatan  dan  Sulawesi  Barat,  PT  Bank  Artha  Pembangunan  Daerah  Sulawesi  Selatan  dan 
Graha  Internasional  Tbk,  PT  Bank  Pembangunan  Sulawesi  Barat,  PT  Bank  Artha  Graha 
Daerah  Maluku  dan  Maluku  Utara,  PT  Bank  Internasional Tbk, PT Bank Pembangunan Daerah 
Pembangunan  Daerah  Daerah  Istimewa  Yogyakarta,  Maluku  dan  Maluku  Utara,  PT  Bank 
PT  Bank  Pembangunan  Daerah  Jambi,  PT  Bank  Pembangunan  Daerah  Daerah  Istimewa 
Nagari,  PT  Bank  Pembangunan  Daerah  Kalimantan  Yogyakarta,  PT  Bank  Pembangunan  Daerah 
Tengah, PT Bank Pembangunan Daerah Bali, PT Bank  Jambi,  PT  Bank  Nagari,  PT  Bank  Pembangunan 
Pembangunan   Daerah   Sumatera   Utara,   PT   Bank  Daerah  Kalimantan  Tengah,  PT  Bank 
Pembangunan Daerah Jawa Tengah,  PT Bank Negara  Pembangunan  Daerah  Bali,  PT  Bank 
Indonesia  Syariah,  PT  Bank  Jabar  Banten  Syariah,  Pembangunan  Daerah  Sumatera  Utara,  PT  Bank 
PT  Bank  Aceh  Syariah,  PT  Indonesia  Infrastructure  Pembangunan  Daerah  Jawa  Tengah,  PT  Bank 
Finance,  PT  Bank  Riau  Kepri,  PT  Bank  Sumsel  Babel,  Negara Indonesia Syariah, PT Bank Jabar Banten 
PT  Pembangunan  Daerah  Kalimantan  Selatan,  Syariah,  PT  Bank  Aceh  Syariah,  PT  Indonesia 
PT  Pembangunan  Daerah  Sulawesi  Tengah,  PT  Bank  Infrastructure  Finance,  PT  Bank  Riau  Kepri, 
Pembangunan  Daerah  Istimewa  Yogyakarta  Syariah,  PT Bank Sumsel Babel, PT Pembangunan Daerah 
PT  Bank  Riau  Kepri  Syariah  dan  PT  Bank  Kalsel  Kalimantan  Selatan,  PT  Pembangunan  Daerah 
Syariah.   Sulawesi Tengah, PT Bank Pembangunan Daerah 
  Istimewa Yogyakarta Syariah, PT Bank Riau Kepri 
Syariah dan PT Bank Kalsel Syariah. 
     
Keduapuluh  empat  bank  tersebut  memberikan  fasilitas    These  twenty  four  banks  provided  a  credit  facility 
kredit  maksimum  sebesar  Rp  5.248.541.000.000  yang  with  a  maximum  credit  facility  limit  of 
terdiri  dari  Kredit  Investasi  dan  Kredit  Bunga  Rp  5,248,541,000,000  which  consists  of 
masa  Konstruksi  (IDC)  masing-masing  sebesar  Investment Credit and Interest During Construction 
Rp 4.919.070.000.000 dan Rp 329.471.000.000. Kedua  (IDC)  amounted  to  Rp  4,919,070,000,000  and             
fasilitas  tersebut  diberikan  untuk  keperluan  Rp  329,471,000,000,  respectively.  Both  facilities 
pembangunan Jalan Tol Ruas Pemalang – Batang.  are  provided  for  the  development  of  Pemalang  - 
Batang Toll Road. 
   
Jangka  waktu  kredit  investasi  dan  IDC  adalah  162  The investment credit and IDC have a credit term 
bulan atau 14 tahun termasuk masa tenggang 24 bulan  loan  of  162  months or  14 years  including a  grace 
atau  2  tahun  sejak  tanggal  efektif.  Suku  bunga  adalah  period  of  24  months  or  2  years  from  the  effective 
rata-rata  tertimbang  atas  dasar  suku  bunga  yaitu  date.  The  interest  rate  of  this  loan  is  weighted 
Reference  Rate  (LPS)  ditambah  dengan  Margin  atau  average interest rate based on the Reference Rate 
setara dengan 10,5% per tahun.  (LPS)  plus  Margin  or  equivalent  to  10.5%  per 
annum. 
   
Pada  tanggal  30  September  2019  saldo  pinjaman  As  of  September  30,  2019,  the  Company's  loan 
Perusahaan  kepada  PT  Bank  CIMB  Niaga  Tbk  –  Unit  balance  to  PT  Bank  CIMB  Niaga  Tbk  –  Business 
Usaha  Syariah  sebesar  Rp  473.899.980.196,  PT  Bank  Unit  Syariah  amounted  to  Rp  473,899,980,196, 
Pembangunan  Daerah  Kalimantan  Timur  dan  PT Bank Pembangunan Daerah Kalimantan Timur 
Kalimantan  Utara  –  Unit  Usaha  Syariah  sebesar  dan  Kalimantan  Utara  –  Business  Unit  Syariah 
Rp  22.776.991.769,  PT  Bank  Panin  Dubai  Syariah  amounted  to  Rp  22,776,991,769,  PT  Bank  Panin 
sebesar Rp 321.549.852.200, PT Bank Sumsel Babel - Dubai  Syariah  amounted  to  Rp  321,549,852,200, 
Unit  Usaha  Syariah  sebesar  Rp  5.694.247.942,  PT  Bank  Sumsel  Babel  –  Business  Unit  Syariah 
PT  Bank  Aceh  –  Unit  Usaha  Syariah  sebesar  amounted  to  Rp  5,694,247,942,  PT  Bank  Aceh  - 
Rp  391.369.625.285,  PT  Bank  Pembangunan  Daerah  Business  Unit  Syariah  amounted  to 
Riau  Kepri  –  Unit  Usaha  Syariah  sebesar  Rp  391,369,625,285,  PT  Bank  Pembangunan 
Rp  73.387.418.933,  PT  Bank  Pembangunan  Daerah  Daerah  Riau  Kepri  -  Business  Unit  Syariah 
DIY – Unit Usaha Syariah sebesar Rp 48.917.881.910,  amounted  to  Rp  73,387,418,933,  PT  Bank 
PT Bank Pembangunan Daerah Jawa Barat dan Banten  Pembangunan  Daerah  DIY  -  Business  Unit 
Unit  Usaha  Syariah  sebesar  Rp  52.334.009.131,  Syariah  amounted  to  Rp  48,917,881,910, 
PT  Bank  Pembangunan  Daerah  Jawa  Timur  –  Unit  PT  Bank  Pembangunan  Daerah  Jawa  Barat  dan 
Usaha  Syariah  sebesar  Rp  90.371.825.918,  PT  Bank  Banten  -  Business  Unit  Syariah  amounted  to 
Pembangunan  Daerah  Kalimantan  Barat  sebesar  Rp  52,334,009,131,  PT  Bank  Pembangunan 
Rp  181.093.796.953,  PT  Bank  Kalimantan  Selatan  –  Daerah  Jawa  Timur  -  Business  Unit  Syariah 
Unit  Usaha  Syariah  sebesar  Rp  54.619.193.897,  amounted  to  Rp  90,371,825,918,  PT  Bank 
PT  Bank  Aceh  sebesar  Rp  34.783.586.309,  PT  Bank  Pembangunan  Daerah  Kalimantan  Barat 
Pembangunan  Daerah  Sumatera  Utara  sebesar  amounted  to  Rp  181,093,796,953,  PT  Bank 

182
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Rp  149.812.500.000,  PT  Bank  Pembangunan  Daerah  Kalimantan  Selatan    -  Business  Unit  Syariah 
Sumatera  Barat  sebesar  Rp  16.757.546.605,  amounted  to  Rp  54,619,193,897,  PT  Bank  Aceh 
PT  Bank  Pembangunan  Daerah  Jambi  sebesar  amounted  to  Rp  34,783,586,309,  PT  Bank 
Rp  149.812.500.000,  PT  Bank  Pembangunan  Pembangunan  Daerah  Sumatera  Utara  amounted 
Daerah  Bengkulu  sebesar  Rp  82.282.000.370,  to Rp 149,812,500,000, PT Pembangunan Daerah 
PT  Bank  Pembangunan  Daerah  DIY  sebesar  Sumatera  Barat  amounted  to  Rp  16,757,546,605, 
Rp  49.937.500.000,  PT  Bank  Pembangunan  Daerah  PT  Bank  Pembangunan  Daerah  Jambi 
Bali  sebesar  Rp  165.629.545.845,  PT  Bank  amounted  to  Rp  149,812,500,000,  PT  Bank 
Pembangunan Daerah   Kalimantan   Tengah   sebesar  Pembangunan  Daerah  Bengkulu  amounted  to 
Rp  149.812.500.000,  PT  Bank  Pembangunan  Daerah  Rp  82,282,000,370,  PT  Bank  Pembangunan 
Kalimantan  Timur  dan  Kalimantan  Utara  sebesar  Daerah  DIY  amounted  to  Rp  49,937,500,000, 
Rp  8.378.773.304,  PT  Bank  Pembangunan  Daerah  PT Bank Pembangunan Daerah Bali amounted to 
Kalimantan  Selatan  sebesar  Rp  240.484.564.519,  Rp  165,629,545,845,  PT  Bank  Pembangunan 
PT  Bank  Pembangunan  Daerah  Sulawesi  Tengah  Daerah  Kalimantan  Tengah  amounted  to 
sebesar  Rp  49.937.500.000,  PT  Bank  Pembangunan  Rp  149,812,500,000,  PT  Bank  Pembangunan 
Daerah  Sulawesi  Selatan  dan  Sulawesi  Barat  sebesar  Daerah  Kalimantan  Timur  dan  Kalimantan  Utara 
Rp  74.906.250.000,  PT  Bank  Pembangunan  Daerah  amounted  to  Rp  8,378,773,304,  PT  Bank 
Sumatera  Selatan  dan  Bangka  Belitung  sebesar  Pembangunan  Daerah  Kalimantan  Selatan 
Rp  369.339.120.703,  PT  Bank  Pembangunan  Daerah  amounted  to  Rp  240,484,564,519,  PT  Bank 
Riau dan Kepulauan Riau sebesar Rp 360.538.834.038,  Pembangunan  Daerah  Sulawesi  Tengah 
PT  Bank  Pembangunan  Daerah  Papua  sebesar  amounted  to  Rp  49,937,500,000,  PT  Bank 
Rp  548.425.166.597,  PT  Bank  Pembangunan  Daerah  Pembangunan  Daerah  Sulawesi  Selatan  dan 
Maluku dan Maluku Utara sebesar Rp 115.119.526.277,  Sulawesi  Barat  amounted  to  Rp  74,906,250,000, 
PT  Bank  Pembangunan  Daerah  Nusa  Tenggara  Timur  PT  Bank  Pembangunan  Daerah  Sumatera 
sebesar  Rp  179.935.360.401,  PT  Bank  Pembangunan  Selatan  dan  Bangka  Belitung  amounted  to 
Daerah  Jawa  Timur  sebesar  Rp  657.295.171.786,  Rp  369,339,120,703,  PT  Bank  Pembangunan 
PT Bank Nagari sebesar Rp 199.750.000.000, PT Bank  Daerah  Riau  dan  Kepulauan  Riau  amounted  to  
Pan  Indonesia  Tbk  sebesar  Rp  497.955.555.601,  Rp  360,538,834,038,  PT  Bank  Pembangunan 
PT  Bank  Artha  Graha  International  Tbk  sebesar  Daerah  Papua  amounted  to  Rp  548,425,166,597, 
Rp  149.812.500.000,  dan  PT  Bank  Pembangunan  PT  Bank  Pembangunan  Daerah  Maluku  dan 
Daerah Jawa Tengah sebesar Rp 258.128.795.475.  Maluku  Utara  amounted  to  Rp  115,119,526,277, 
PT  Bank  Pembangunan  Daerah  Nusa  Tenggara 
Timur amounted to Rp 179,935,360,401, PT Bank 
Pembangunan  Daerah  Jawa  Timur  amounted  to 
Rp 657,295,171,786, PT Bank Nagari amounted to 
Rp 199,750,000,000, PT Bank Pan Indonesia Tbk 
amounted  to  Rp  497,955,555,601,  PT  Bank 
Artha  Graha  International  Tbk  amounted  to 
Rp 149,812,500,000, dan PT Bank Pembangunan 
Daerah  Jawa  Tengah  amounted  to 
Rp 258,128,795,475.  
   
Pada  tanggal  31  Desember  2018  saldo  pinjaman  As  of  December  31,  2018,  the  Company's 
Perusahaan  kepada  PT  Bank  Pembangunan  Daerah  loan  balance  to  PT  Bank  Pembangunan 
Kalimantan  Barat  sebesar  Rp  171.699.000.000,  Daerah  Kalimantan  Barat  amounted  to 
PT Bank Pembangunan Daerah Sumatera Selatan dan  Rp  171,699,000,000,  PT  Bank  Pembangunan 
Bangka Belitung sebesar Rp 171.699.000.000, PT Bank  Daerah  Sumatera  Selatan  dan  Bangka 
Pembangunan  Daerah  Riau  dan  Kepulauan  Riau  Belitung  amounted  to  Rp  171,699,000,000, 
sebesar  Rp  128.774.000.000,  PT  Bank  Pembangunan  PT  Bank  Pembangunan  Daerah  Riau 
Daerah  Papua  sebesar  Rp  85.849.000.000,  PT  Bank  dan  Kepulauan  Riau  amounted  to  
Pembangunan  Daerah  Maluku  dan  Maluku  Utara  Rp  128,774,000,000,  PT  Bank  Pembangunan 
sebesar  Rp  55.802.000.000,  PT  Bank  Pembangunan  Daerah  Papua  amounted  to  Rp  85,849,000,000, 
Daerah  Nusa  Tenggara  Timur  sebesar  PT  Bank  Pembangunan  Daerah  Maluku  dan 
Rp  42.925.000.000,  dan  PT  Bank  Pembangunan  Maluku  Utara  amounted  to  Rp  55,802,000,000, 
Daerah Jawa Timur sebesar Rp 354.413.305.370.  PT  Bank  Pembangunan  Daerah  Nusa  Tenggara 
Timur  amounted  to  Rp  42,925,000,000,  and 
PT  Bank  Pembangunan  Daerah  Jawa  Timur 
amounted to Rp 354,413,305,370. 
   
 
 
 
 

183
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
31. UTANG VENTURA BERSAMA JANGKA PANJANG   31. NON-CURRENT JOINT VENTURES PAYABLES 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Ventura Bersama/Joint Ventures 770.564.755.648  671.607.440.338 


Jumlah/Total 770.564.755.648 671.607.440.338
 

 
Akun  ini  merupakan  penerimaan  termin  dari  ventura  This  account  represents  the  account  receivables 
bersama  yang  diterima  oleh  Perusahaan  dan  akan  collection that is received by the Company and will 
diperhitungkan pada saat penutupan kerjasama operasi  be settled at the end of those joint operational. 
tersebut. 
   
32. UTANG PEMBELIAN ASET TETAP   32. DEBT PURCHASES OF FIXED ASSETS 
 
Entitas  anak,  WTR  menandatangani  Perjanjian  Utang    A subsidiary, WTR entered into Loan for Purchase 
Pembelian  Aset  Tetap  untuk  pembelian  kendaraan  of  Fixed  Assets  Agreement  in  order  to  purchase 
bermotor dengan rincian sebagai berikut:  vehicles with detail as follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

PT Toyota Astra Financial 68.436.465  204.705.835  PT Toyota Astra Financial


Dikurangi bagian jatuh tempo Less: current portion maturities 
dalam waktu satu tahun (68.075.729) (198.479.272) in one year  
Bagian Jangka Panjang 360.736 6.226.563 Long-Term Portion

Utang  pembelian  aset  tetap  dikenakan  bunga  sebesar    Debt  purchases  of  fixed  assets  bears  interest  at 
18% per tahun dan jatuh tempo paling akhir 24 Januari  18% per annum with maturity date on January 24, 
2020.  Utang  pembelian  aset  tetap dijamin  dengan  aset  2020.  Debt  of  fixed  assets  is  secured  by    
yang dibeli.  the purchased assets. 
     
33. UTANG LAIN-LAIN JANGKA PANJANG   33. OTHER LONG-TERM PAYABLES 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
PT Sarana Multi Infrastruktur 825.671.398.210  -- 
Sub Jumlah/ Sub Total 825.671.398.210 --
Pihak Ketiga/ Third Parties
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 1.600.192.407.144  1.548.508.712.641 
Lain-lain/ Others 625.820.000  625.992.937 
Sub Jumlah/ Sub Total 1.600.818.227.144 1.549.134.705.578
Jumlah/ Total 2.426.489.625.354 1.549.134.705.578
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

184
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
34. UANG MUKA KONTRAK JANGKA PANJANG   34. ADVANCES ON LONG-TERM CONTRACT 
 
Rincian  saldo  uang  muka  kontrak  jangka  panjang    The  details  of  outstanding  advances  on  long-term 
sebagai berikut:  contract were as follows: 
 
 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
PT Hutama Karya  --  65.577.838.430 
Lain-lain/ Others  (di bawah/ below  Rp 20 Milyar/ Billion ) 4.985.756.856  11.183.137.520 
Sub Jumlah/ Sub Total 4.985.756.856 76.760.975.950

Pihak Ketiga/ Third Parties


Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 51.287.531.184  20.761.708.668 
Kementrian Agama/ The Ministry of Religion 45.855.893.825  49.447.140.764 
Kementerian Perhubungan/ The Ministry of Transportation --  20.710.663.874 
Lain-lain/ Others  (di bawah/ below  Rp 20 Milyar/ Billion ) 50.120.222.568  95.220.272.978 
Sub Jumlah/ Sub Total 147.263.647.577 186.139.786.284
Jumlah/ Total 152.249.404.433 262.900.762.234
 
35. LIABILITAS IMBALAN KERJA   35. EMPLOYEE BENEFIT LIABILITIES 
 
Rincian  kewajiban  imbalan  pascakerja  sesuai  UU  The  details  of  post-employment  benefits  under 
Ketenagakerjaan  No.  13/2003  dan  kewajiban  manfaat  Labor Law No 13/2003 and other long-term benefit 
jangka  panjang  lainnya  berdasarkan  entitas  yang  based  on  its  entities  that  is  presented  in 
disajikan  dalam  laporan  keuangan  konsolidasian  consolidated statements of financial position are as 
adalah sebagai berikut:  follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Perusahaan/ the Company 73.837.509.628  56.466.776.675 


Entitas Anak/ Subsidiaries
PT Waskita Beton Precast Tbk 14.354.823.173  10.263.807.268 
PT Trans Jabar Tol 2.577.685.523  2.327.916.133 
PT Kresna Kusuma Dyandra Marga 1.543.304.411  1.536.615.630 
PT Waskita Toll Road 1.313.583.944  742.646.791 
PT Cibitung Tanjung Priok Port Tollways  659.773.309  532.194.904 
PT Waskita Karya Realty 471.422.904  471.422.904 
PT Cimanggis Cibitung Tollways 443.081.518  430.760.619 
Jumlah/ Total 95.201.184.410 72.772.140.924

 
Perusahaan The Company
     
Perusahaan  menyelenggarakan  program  pensiun    The Company provides a defined benefit and other 
imbalan pasti dan imbalan kerja jangka panjang lainnya  long  terms  benefit  covering  all  the  qualified 
untuk semua karyawan yang memenuhi persyaratan.   employees.  
   
Nilai  kewajiban  yang  termasuk  dalam  laporan  posisi  The  amount  of  liabilities  included  in  the 
keuangan  konsolidasian  dari  manfaat  pasca-kerja  di  consolidated  statements  of  financial  position 
bawah  UU  Ketenagakerjaan  No.  13/2003  dan  arising from post employment benefits under Labor 
kewajiban  manfaat  jangka  panjang  lainnya  adalah  Law  No. 13/2003  and  other  long-term  benefit  are 
sebagai berikut:   as follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Imbalan pascakerja sesuai  Post-employment benefits under
UU Ketenagakerjaan No.13/2003 49.335.812.017  33.116.247.246  Labor Law No. 13/2003
Manfaat jangka panjang lainnya 24.501.697.611  23.350.529.429  Other long-term benefit
Nilai Kini Kewajiban Imbalan Kerja - Akhir 73.837.509.628 56.466.776.675 Present Value Benefit Obligation - Ending

185
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
   

Dana  pensiun  ini  dikelola  oleh  PT  Asuransi  Jiwasraya  The  pension  plan  is  managed  by  PT  Asuransi 
(Persero)  yang  akta  pendiriannya  telah  disahkan  oleh  Jiwasraya (Persero), the deed of establishment of 
Menteri  Keuangan  Republik  Indonesia  dengan  KEP- which was approved by the Minister of Finance of 
84/MK/IV/2/1973 tanggal 28 Pebruari 1973. Pada tahun  the  Republic  of  Indonesia  in  his  decision  letter 
2006,  Perusahaan  menandatangani  perjanjian  kerja  KEP-84/MK/IV/2/1973 dated February 28, 1973. In 
sama  No.  WK:  L.20/P/WK/2006  dan  No.  AJS:  2006,  the  Company  signed  a  cooperation 
079.SJ.U.076 tanggal 28 Juli 2006 tentang Pengelolaan  agreement  No.  WK:L.20/P/WK/2006  and  
Program Asuransi Pesangon Kumpulan dan Addendum  No.  AJS:  079.SJ.U.076  on  July  28,  2006 
I  Perjanjian  Kerjasama  No. L.20/P/WK/2006;  No.  079  concerning  to  Management  of  Severance  Group 
Sj. U. 0706 tanggal 25 April 2008.  Insurance  Program  and  Addendum  I  to 
Cooperation  Agreement  No. L.20/P/WK/2006; 
No. 079 SJ. U. 0706 on April 25, 2008. 
     
Imbalan  kerja  memberikan  eksposur  Perusahaan  Employee  benefit  typically  exposes  the  Company 
terhadap  risiko  aktuarial  seperti  risiko  investasi,  risiko  to  actuarial  risks such  as  investment  risk,  interest 
tingkat bunga, risiko harapan hidup dan risiko gaji.  rate risk, longevity risk and salary risk. 
     
Risiko Investasi  Investment risk 
     
Nilai  kini  kewajiban  imbalan  pasti  dihitung  The  present  value  of  the  defined  benefit  plan 
menggunakan tingkat diskonto yang ditetapkan dengan  liability  is  calculated  using  a  discount  rate 
mengacu  pada  imbal  hasil  obligasi  korporasi  determined  by  reference  to high  quality  corporate 
berkualitas  tinggi;  jika  pengembalian  aset  program  di  bond  yields;  if  the  return  on  plan  asset  is  below 
bawah  tingkat  tersebut,  hal  itu  akan  mengakibatkan  this  rate,  it  will  create  a  plan  deficit.  Currently    
defisit  program.  Saat  ini  program  tersebut  memiliki  the  plan  has  a  relatively  balanced  investment  in 
investasi  yang  relatif  seimbang  pada  efek  ekuitas,  equity  securities,  debt  instruments  and  real 
instrumen  utang  dan  real  estate.  Karena  sifat  jangka  estates.  Due  to  the  long-term  nature  of  the  plan 
panjang  dari  liabilitas  program,  dewan  dana  pensiun  liabilities, the board of the pension fund considers 
perlu  menetapkan  bahwa  bagian  wajar  dari  aset  it appropriate that a reasonable portion of the plan 
program  harus  diinvestasikan  pada  efek  ekuitas  dan  assets should be invested in equity securities and 
real  estate  untuk  meningkatkan  imbal  hasil  yang  in  real  estate  to  leverage  the return  generated by 
dihasilkan oleh dana.  the fund. 
 
Risiko Tingkat Bunga  Interest Risk 
     
Penurunan  suku  bunga  obligasi  akan  meningkatkan  A  decrease in  the  bond  interest  rate  will  increase 
liabilitas program; namun, sebagian  akan saling  hapus  the  plan  liability;  however,  this  will  be  partially 
oleh  peningkatan  imbal  hasil  atas  investasi  instrumen  offset  by  an  increase  in  the  return  on  the  plan’s 
utang.  debt investments. 
     
Risiko Harapan Hidup  Longevity risk 
     
Nilai  kini  kewajiban  imbalan  pasti  dihitung  dengan  The  present  value  of  the  defined  benefit  plan 
mengacu  pada  estimasi  terbaik  dari  mortalitas  peserta  liability  is  calculated  by  reference  to  the  best 
program  baik  selama  dan  setelah  kontrak  kerja.  estimate  of  the  mortality  of  plan  participants  both 
Peningkatan  harapan  hidup  peserta  program  akan  during and after their employment. An increase in 
meningkatkan liabilitas program.  the  life  expectancy  of  the  plan  participants  will 
increase the plan’s liability. 
   
Risiko Gaji  Salary Risk 
     
Nilai  kini  kewajiban  imbalan  pasti  dihitung  dengan  The  present  value  of  the  defined  benefit  plan 
mengacu  pada  gaji  masa  depan  peserta  program.  liability  is  calculated  by  reference  to  the  future 
Dengan demikian, kenaikan gaji peserta program akan  salaries of plan participants. As such, an increase 
meningkatkan liabilitas program itu.  in  the  salary  of  the  plan  participants  will  increase 
the plan’s liability. 
   
 
 
 
 
 
 

186
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
a.  Program Imbalan Pascakerja  a.  Post-employment Benefit Plan 
     
Perusahaan  menyelenggarakan  program  pensiun    The  Company  established  defined  benefit 
imbalan  pasti  mencakup  semua  karyawan  tetap  pension plan covering all the local  permanent 
lokal.  Program  ini  memberikan  imbalan  pensiun  employees.  This  plan  provides  pension 
berdasarkan penghasilan  dasar  pensiun  dan masa  benefits  based  on  years  of  service  and 
kerja  karyawan.  Perusahaan  telah  membukukan  salaries of  the employees. The Company has 
liabilitas manfaat karyawan sesuai dengan Undang- recorded  liabilities  of  employee  benefits  in 
Undang  No.  13  Tahun  2003  tentang  accordance  with  Law  No.  13  Year  2003 
Ketenagakerjaan,  menggunakan  teknik  aktuarial,  regarding  to  pertaining  to  man  power,  using 
dalam  rangka  penerapan  PSAK  No.  24  (Revisi  actuarial  techniques,  within  the  framework  of 
2013) tentang Imbalan Kerja.   the  implementation  of  Indonesian  PSAK 
  No. 24 (Revised 2013) of Employee Benefits. 
   
Liabilitas  imbalan  pasca-kerja  Perusahaan  The  amounts  included  in  the  statement  of 
sehubungan  dengan  program  pensiun  yang  financial  position  arising  from  the  Company’s 
termasuk  dalam  laporan  posisi  keuangan  obligation  in  respect  of  the  defined  benefits 
konsolidasian adalah sebagai berikut:  plan is as follows: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Nilai Kini Kewajiban               342.779.668.256               354.529.200.634 Present Value of Funded Obligations


Nilai Wajar Aset Program              (293.443.856.239)              (321.412.953.388) Fair Value of Plan Assets
Liabilitas Bersih yang Timbul Net Liability Arising from
dari Kewajiban Imbalan Pasti 49.335.812.017 33.116.247.246  Defined Benefits Obligation   

 
Mutasi  nilai  kini  kewajiban  imbalan  pasti  adalah  Movements  in  the  present  value  of            
sebagai berikut:  the  defined  benefit  obligation  were  as 
follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Saldo awal nilai kini liabilitas 354.529.200.634  356.850.052.675  Beginning Balance
Biaya jasa kini 22.372.783.010  27.404.980.147  Current Service Cost
Biaya bunga 21.954.938.440  24.490.177.647  Interest Cost
Kerugian Kurtailment 3.679.517.631  8.261.422  Loss from Curtailment
Imbalan yang Dibayarkan (46.196.552.840) (18.354.221.422) Benefits Payment
Pengukuran Kembali Liabilitas (Aset) Remeasurement on the Net Defined
Imbalan Pasti Neto: Benefit (Asset) Liability:
(Keuntungan) Kerugian Aktuarial yang Actuarial (Gains)/Losses Arising
Timbul dari Penyesuaian Pengalaman (13.560.218.619) (35.870.049.835) from Experience Adjustment
Saldo Akhir Nilai Kini Liabilitas 342.779.668.256 354.529.200.634 Ending Balance of Present Value Obligation
 
Mutasi nilai wajar dari aset program adalah sebagai  Movements in the fair value of the plan assets 
berikut:  were as follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Nilai wajar aset program- awal 321.412.953.388  274.519.197.981  Opening fair value of plan assets


Pengukuran kembali keuntungan (kerugian): Remeasurement gain (loss):
Imbal hasil aset program (tidak termasuk jumlah Return on plan assets (excluding amounts
Return on plan assets (excluding amounts 
yang dimasukkan dalam beban bunga neto) 20.490.075.778  19.216.343.858  included in net interest expense)
Kontribusi pemberi kerja --  54.956.196.011  Contributions from the employer
(Kerugian) Aktuarial atas Aset Program  (9.910.281.212) (11.024.178.013) Actuarial (Loss) on Assets Programs
Pembayaran manfaat (38.548.891.715) (16.254.606.449) Benefits paid
Nilai Wajar Aset Program - Akhir 293.443.856.239 321.412.953.388 Closing Fair Value of Plan Assets - Ending

Asumsi  aktuarial  yang  signifikan  untuk  penentuan  Significant  actuarial  assumptions  for         
kewajiban  imbalan  pasti  adalah  tingkat  diskonto,  the determination of the defined obligation are 
kenaikan  gaji  yang  diharapkan  dan  mortalitas.  discount  rates  expected  salary  increase  and 
Sensitivitas  analisis  di  bawah  ini  ditentukan  mortality. The sensitivity analyses below have 
berdasarkan  masing-masing  perubahan  asumsi  been  determined  based  on  reasonably 

187
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
yang mungkin terjadi pada akhir periode pelaporan,  possible  changes  of  the  respective 
dengan semua asumsi lain konstan.  assumptions  occurring  at  the  end  of                  
the  reporting  period,  while  holding  all  other 
assumptions constant. 
   
Berikut  adalah  analisa  sensitivitas  atas  asumsi  The  followings  are  the  sensitivity  analysis  of 
signifikan  yang  mempengaruhi  nilai  kini  kewajiban  significant assumptions that affect the present 
dan biaya jasa kini:  value of obligations and current service costs: 
   
Nilai Kini Kewajiban/
Present Value of Biaya Jasa Kini/
Obligation Current Service Cost
Rp Rp

30 September/ September 30, 2019:


Perubahan Tingkat Diskonto/
Changes in Discounted Rate
Naik Menjadi/ Increase to  9% 368.975.528.599  23.455.173.987 
Tingkat Diskonto/ Discounted Rate  8% 391.678.840.249  25.941.676.952 
Turun Menjadi/ Decrease to  7% 418.158.907.218  28.980.569.409 
Perubahan Tingkat Kenaikan Upah/
Changes in Wages Rate
Naik Menjadi/ Increase to  9% 417.887.492.116  28.949.071.624 
Tingkat Kenaikan Upah/ Wages Increase Rate  8% 391.678.840.249  25.941.676.952 
Turun Menjadi/ Decrease to 7 % 368.786.726.699  23.434.736.926 
31 Desember/ December 31, 2018:
Perubahan Tingkat Diskonto/
Changes in Discounted Rate
Naik Menjadi/ Increase to  9,5% 334.261.036.218  24.579.939.777 
Tingkat Diskonto/ Discounted Rate  8,5% 354.529.200.634  27.404.980.147 
Turun Menjadi/ Decrease to  7,5% 377.909.227.668  30.871.083.564 
Perubahan Tingkat Kenaikan Upah/
Changes in Wages Rate
Naik Menjadi/ Increase to  9% 377.791.351.333  30.852.980.410 
Tingkat Kenaikan Upah/ Wages Increase Rate  8% 354.529.200.634  27.404.980.147 
Turun Menjadi/ Decrease to 7 % 333.998.461.164  24.544.616.876 
 
Durasi  rata-rata  dari  kewajiban  imbalan  pada  The average duration of the benefit obligation 
tanggal  30  September  2019  dan  31  Desember  at  September  30,  2019  and  December  31, 
2018 adalah 19,33 tahun dan 19,90 tahun.  2018 is 19.33 years and 19.90 years. 
   
b.  Imbalan Jangka Panjang Lainnya  b.  Other Long-term Benefits 
   
Perusahaan  juga  menyediakan  manfaat  cuti  besar  The  Company  also  provides  long  service 
untuk karyawan yang telah bekerja selama 6 tahun  leaves  to  the  employee  who  have  already 
dalam bentuk satu kali gaji.  rendered 6 years of service in the form of cash 
amounting one time salary. 
   
Mutasi  nilai  kini  kewajiban  imbalan  jangka  panjang  Movements  in  the  present  value  long-term 
lainnya adalah sebagai berikut:  benefits obligations were as follows: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Saldo Awal Nilai Kewajiban Manfaat  Beginning Balance Long-Term
Jangka Panjang Lainnya 23.350.529.429  24.028.183.322  Benefits Obligation
Biaya Jasa Kini 1.151.168.182  4.108.641.367  Current Service Cost
Biaya Bunga --  1.681.972.832  Interest Cost
(Keuntungan) Kerugian Kurtailment --  (6.468.268.092) (Gain) Loss from Curtailment
Saldo Akhir Nilai Kewajiban Manfaat Ending Balance Long-Term
Jangka Panjang Lainnya 24.501.697.611 23.350.529.429 Benefits Obligation
 

188
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perhitungan  imbalan  pasca-kerja  dihitung  oleh  The  cost  of  providing  post-employment 
aktuaris  independen  PT Praptasentosa  Gunajasa.  benefits is calculated by independent actuary, 
Asumsi aktuarial pada tanggal 30 September 2019  PT  Praptasentosa  Gunajasa.  Actuarial 
dan 31 Desember 2018 sebagai berikut:  assumptions  as  of  September  30,  2019  and 
December 31, 2018 are as follows: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Tingkat Diskonto 8,00% 8,50% Discount Rate
Tingkat Kenaikan Gaji 8,00% 8,00% Annual Salary Increasing Rate
Tingkat Mortalitas TMI 2011 TMI 2011 Mortality Rate
Tingkat Cacat 0% TMI 2011 0% TMI 2011 Disability Rate
Umur Pensiun Normal (tahun) 55 56 Normal retirement age (years)
 
36. MODAL SAHAM   36. SHARE CAPITAL 

a. Modal Saham a. Share Capital

Sesuai  daftar  pemegang  saham  yang  dikeluarkan    According  to  the  shareholders  list  from  Biro 
oleh  Biro  Administrasi  Efek,  PT  Datindo  Entrycom,  Adminstrasi  Efek,  PT  Datindo  Entrycom,               
susunan  pemegang  saham  Perusahaan  adalah  the  composition  of  the  Company’s  capital  were 
sebagai berikut:  as follows: 
     
30 September/ September 30, 2019 /
31 Desember/ December 31, 2018
Persentase Jumlah Modal
Kepemilikan/ Disetor/
Jumlah Saham/ Percentage of Total Paid In
Total Shares Ownership Capital
Modal Dasar              26.000.000.000 2.600.000.000.000  Authorized Capital

Modal Ditempatkan dan Disetor Penuh: Subscribed and Fully Paid Capital:
Saham Preferen (Seri A Dwiwarna) Preferred Stock (Dwi Warna Serie A)
  Pemerintah Republik Indonesia                                     1 0,00%                                 100   Government of Republic of Indonesia   
Saham Biasa (Seri B) Common Stock (Serie B)
  Pemerintah Republik Indonesia 8.963.697.886  66,04% 896.369.788.600    Government of Republic of Indonesia   
Masyarakat (kepemilikan <0,5%) 4.610.204.713  33,96% 461.020.471.299  Public (each holding <0.5%)
Jumlah Modal Ditempatkan
dan Disetor Penuh 13.573.902.600 100,00% 1.357.390.259.999 Total Issued and Fully Paid
 
Dibawah  ini  merupakan  Akta  Notaris  terakhir  Below are the latest Notarial Deed related to share 
terkait modal saham:  capital: 
   
  Berdasarkan  Akta  No.  46  tanggal      Based  on  the  Deed  No.  46  dated  May  26, 
26 Mei 2015 oleh Fathiah Helmi, S.H., Notaris  2015 of Fathiah Helmi, S.H., Notary in Jakarta, 
di  Jakarta,  pemegang  saham  menyetujui  the  Company’s  shareholders  approved         
peningkatan  modal  disetor  sebanyak  the increase in the Company’s to 186,471,154 
186.471.154  lembar.  Modal  disetor  semula  shares.  Paid  up  capital  from  9,727,504,205 
9.727.504.205  lembar  atau  setara   shares  or  Rp  972,750,420,500  to 
dengan  Rp 972.750.420.500  menjadi   9,913,975,359 shares or Rp 991,397,535,900. 
9.913.975.359  lembar  atau  setara   This  change  has  been  approved  by 
Rp  991.397.535.900.  Perubahan  tersebut  the  Ministry  of  Law  and  Human  Rights  No. 
telah  disahkan  oleh  Kementerian  Hukum  dan  AHU-AH.01.03/0934821 dated May, 26, 2015. 
Hak  Asasi  Manusia  No.  AHU-AH.01.03/  Based on the Deed No. 37 from dated July 30, 
0934821  tanggal  26  Mei  2015.  Berdasarkan  2015  Notary  Fathiah  Helmi,  S.H.,  Notary  in 
Akta No. 37 tanggal 30 Juli 2015 dari Fathiah  Jakarta,  there  was  an  increasing  number  of 
Helmi,  S.H.,  Notaris  di  Jakarta,  terdapat  paid-in  capital  as  much  as  3,653,498  shares, 
penambahan  jumlah  modal  disetor  sebanyak  paid  up  capital  from  9,913,975,360  shares  or 
3.653.498  lembar,  semula  9.913.975.360  Rp  991,397,536,000  become  13,567,473,559 
lembar  atau  setara  Rp 991.397.536.000  shares or Rp 1,356,747,356,000. This change 
menjadi  13.567.473.559  lembar  atau  setara  has been approved by the Ministry of Law and 
dengan  Rp 1.356.747.356.000  Perubahan  Human  Rights  No. AHU-3536245.AH.01.11 
tersebut  disahkan  oleh  Kementerian  Hukum  dated July 30, 2015. 
dan  Hak  Asasi  Manusia  No.  AHU-
3536245.AH.01.11 tanggal 30 Juli 2015. 
 
 

189
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
  Berdasarkan  Akta  Keputusan  Rapat      Based  on  the  Deed  No.  6  of  General 
Pemegang  Saham  No.  6  tanggal  4  Pebruari  Shareholders Meeting dated February 4, 2016 
2016  dari  Fathiah  Helmi,  S.H.,  Notaris  di  from  Fathiah  Helmi,  S.H.,  Notary  in  Jakarta, 
Jakarta,  pemegang  saham  menyetujui  the  shareholders  approved  the  increase  in               
penambahan  jumlah  modal  disetor  sebanyak  the  Company’s  paid-in  capital  of  5,019,750 
5.019.750  lembar  saham,  semula  shares, from 13,567,473,559 shares (equal to 
13.567.473.559  lembar  saham  atau  setara   Rp  1,356,747,356,000  to  13,572,493,310 
Rp  1.356.747.356.000  menjadi  shares  equal  to  Rp  1,357,249,331,000. 
13.572.493.310  lembar  saham  atau  setara      This  change  has  been  approved  by 
Rp  1.357.249.331.000.  Perubahan  tersebut  the  Ministry  of  Law  and  Human  Rights  in  its 
telah  disahkan  oleh  Kementerian  Hukum       decree  No.  AHU-0016611-AH.01.03  dated 
dan  Hak  Asasi  Manusia  No. AHU-0016611- February 5, 2016. 
AH.01.03 tanggal 5  Pebruari 2016. 
 
  Berdasarkan  Akta  Keputusan  Rapat      Based  on  the  Deed  No.  50  of  General 
Pemegang  Saham  No.  50  tanggal  Shareholders  Meeting  dated  November  25, 
25 Nopember  2016  dari  Fathiah  Helmi,  S.H.,  2016  from  Fathiah  Helmi,  S.H.,  Notary  in 
Notaris  di  Jakarta,  pemegang  saham  Jakarta,  the  shareholders  approved 
menyetujui  penambahan  modal  disetor  the  increase  in  the  Company’s  paid-in  capital 
sebanyak  842.439  lembar  saham,  semula  of  842,439  shares,  from  13,572,493,310 
13.572.493.310  lembar  saham  atau  setara  shares  or  equal  to  Rp  1,357,249,331,000  to 
dengan  Rp  1.357.249.331.000  menjadi  13,573,335,750  shares  or  equal  to 
13.573.335.750  lembar  saham  atau  setara  Rp 1,357,333,575,000. This change has been 
dengan  Rp 1.357.333.575.000.  Perubahan  approved  by  the  Ministry  of  Law  and  Human 
tersebut  telah  disahkan  oleh  Kementerian  Rights  of  the  Republic  of  Indonesia  in  its 
Hukum  dan  Hak  Asasi  Manusia   decree  No.  AHU-AH.01.03-0102149  dated 
No.  AHU-AH.  01.03-0102149  tanggal   November 25, 2016. 
25 Nopember 2016. 
     
  Sesuai  dengan  Akta  No.  19  tahun  2018    Based on the Deed No. 19 of 2018 dated April 
tanggal  6  April  2018  tentang  perubahan  6,  2018  regarding  the  Amendment  of 
peningkatan  modal  ditempatkan/disetor  pasal  the  Issuance  of  Paid-up  Capital  of  Article  4 
4  ayat  3  yang  telah  disetujui  oleh  Menteri  paragraph  3  which  has  been  approved  by 
Hukum dan Hak Asasi Manusia dengan Surat  the  Minister  of  Law  and  Human  Rights  in 
Keputusan  No.  AHU-AH.01.03-0137350  Decision  Letter  No.  AHU-AH.01.03-0137350 
Tahun  2018  tanggal  6  April  2018  Year  2018  date  April  6,  2018  explains  that 
menerangkan  bahwa  dengan  adanya  with  the  implementation  of  MESOP  24,200 
pelaksanaan  MESOP  sebanyak  24.200  (Dua  (Twenty  Four  Thousand  Two  Hundred)  of 
Puluh  Empat  Ribu  Dua  Ratus)  saham  seri  B  Series  B  shares  each  with  nominal  value  of 
masing-masing  saham  dengan  nilai  nominal  Rp  100.00  (one  hundred  Rupiah)  or  with  a 
sebesar  Rp  100,00  (seratus  Rupiah)  atau  total  nominal  value  of  Rp  2,420,000.00  (two 
dengan  jumlah  nilai  nominal  sebesar   million  four  hundred  and  twenty  thousand 
Rp  2.420.000,00  (dua  juta  empat  ratus  dua  Rupiah), the total issued and paid up capital of 
puluh  ribu  rupiah)  maka  jumlah  modal  the  Company  increased  from  13,573,878,400 
ditempatkan dan disetor Perseroan meningkat  (thirteen  billion  five  hundred  seventy  three 
dari  13.573.878.400  (tiga  belas  milyar  lima  million  eight  hundred  seventy  eight  thousand 
ratus tujuh puluh tiga juta delapan ratus tujuh  four  hundred)  shares  to  13,573,902,600 
puluh  delapan  ribu  empat  ratus)  saham  (thirteen  billion  five  hundred  seventy  three 
menjadi  13.573.902.600  (tiga  belas  milyar  million  nine  hundred  two  thousand  and  six 
lima ratus tujuh puluh tiga juta sembilan ratus  hundred) shares. 
dua ribu enam ratus) saham.  
   
  Penambahan  modal  saham  sebanyak      Additional paid in capital of 373,700 shares or 
373.700  lembar  saham  atau  setara  dengan  equal  to  Rp  37,369,997  from  excecution  of 
Rp  37.369.997  yang  berasal  dari  eksekusi  MESOP  for  the  period  November  2016  is  still 
MESOP  periode  bulan  Nopember  2016  saat  in process of deed amandement. 
ini sedang dalam proses perubahan akta.  
 
 
 
 
 
 
 
 

190
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
37. TAMBAHAN MODAL DISETOR   37. ADDITIONAL PAID-IN CAPITAL 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Agio Saham Premium on Share
Tambahan modal disetor dari penawaran umum saham  Additional paid-in capital of a public offering
   Perusahaan kepada masyarakat sebesar 3.082.315.000 of shares to the public at 3,082,315,000 shares   
saham dengan nilai nominal Rp 100 per saham, yang with a nominal value of Rp 100 per share,   
   ditawarkan Rp 380 per saham 863.048.200.000  863.048.200.000  which offered Rp 380 per share   
Tambahan modal disetor dari eksekusi opsi saham karyawan 118.826.375.828  118.826.375.828  Additional paid-in capital from the exercise of employee stock options
Tambahan modal disetor dari Penawaran Umum Terbatas I (PUT I) Additional paid-in capital of a Limited Public Offering (LOP I)
   Perusahaan kepada masyarakat sebesar 3.653.498.200 saham dengan of shares to the public at 3,653,498,200 shares with   
   nilai nominal Rp 100 per saham, yang ditawarkan Rp 1.450 per saham 4.969.551.418.508  4.969.551.418.508  par value Rp 100 per share, offered Rp 1,450 per share   
Dikurangi dengan biaya emisi saham (31.910.365.455) (31.910.365.455) Less: Share Issuance Cost
Dikurangi dengan biaya emisi saham penawaran umum terbatas (37.328.848.507) (37.328.848.507) Less: Share Issuance Cost on Limited Public Offering
Penyesuaian atas Perubahan Kepemilikan  Adjustment for Changes Ownership 
atas Entitas Anak                 (330.160.517.937) (330.160.517.937) in Subsidiaries
Saldo Tambahan modal disetor 5.552.026.262.437 5.552.026.262.437 Total Paid In Capital

Modal Disetor Lainnya Other Paid in Capital
Opsi Saham Stock Option
   Saldo Awal --  568.091.840  Beginning Balance   
   Penambahan (Pengurangan) --  (568.091.840)    Additional (Deduction)   
Jumlah Opsi Saham -- -- Total Stock Option
Jumlah 5.552.026.262.437 5.552.026.262.437 Total
 
Tambahan modal disetor - agio saham merupakan agio  Additional  paid  in  capital  –  premium  on  share 
saham  yang  berasal  dari  penawaran  umum  saham  represent  share  premium  resulting  from  public 
Perusahaan  setelah  dikurangi  dengan  biaya  emisi  offering  by  the  Company  net  off  share  issuance 
saham.  cost. 
 
Biaya  emisi  efek  ekuitas  merupakan  biaya  yang    Share  issuance  costs  are  payments  related  to     
berkaitan dengan penerbitan efek ekuitas Perusahaan.    the issuance of Company’s equity securities. These 
Biaya  ini  mencakup  fee  dan  komisi  yang  dibayarkan    costs  include  fees  and  commissions  paid  to          
kepada  penjamin  emisi,  lembaga  dan  profesi  the  underwriter,  supporting  institutions  and 
penunjang  pasar  modal,  dan  biaya  pencetakan  professionals in capital markets, and the registration 
dokumen  pernyataan  pendaftaran,  biaya  pencatatan  document  printing  costs,  cost  of  equity  securities 
efek  ekuitas  dibursa  efek,  serta  biaya  promosi  sesuai  listing  on  the  stock  exchange,  as  well  as 
dengan  Keputusan  Ketua  Badan  Pasar  Modal   promotional cost in accordance with the Decision of 
No. Kep-97/PM/1996 tanggal 28 Mei 1996 yang diubah  the Chairman of the Capital Market Board No. Kep-
dengan  Kep-06/PM/2000  tanggal  13  Maret  2000,  97/PM/1996  dated  May  28,  1996  as  amended  by 
peraturan  No. VIII.G.7  tentang  Pedoman  Penyajian  Kep-06/PM/2000  dated  March  13,  2000,  regulation 
Laporan  Keuangan  Bab  Ekuitas  pasal  Tambahan  No.  VIII.G.7  of  Guidelines  for  the  Preparation  of 
Modal  Disetor.  Biaya  Emisi  Efek  Ekuitas  berasal  dari  Financial  Statements  Chapter  Equity  article 
penawaran  perdana  tahun  2012  sebesar   Additional  Paid-in  Capital.  Share  issuance  costs 
Rp  31.910.365.455  dan  penawaran  umum  terbatas  I  derived  from  the  initial  public  offering  in  2012 
tahun 2015 sebesar Rp 37.328.848.507.  amounted  to  Rp 31,910,365,455  and  limited  public 
offer I year 2015 amounted to Rp 37,328,848,507. 
   
Biaya  emisi  saham  telah  di  audit  oleh  Akuntan  Issuance  costs  have  been  audited  by  an 
Independen  Soejatna,  Mulyana  dan  Rekan   Independent  Accountant  Soejatna,  Mulyana  and 
tanggal  5 Pebruari  2013  dengan  laporan   Partners  dated  February  5,  2013  with  report 
No. 007/SMR/LAI-VIPO/WK/II/2013.  No. 007/SMR/LAI-VIPO/WK/II/2013. 
 
 
 
 
 
 
 
 
 
 
 
 

191
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
38. SALDO LABA   38. RETAINED EARNINGS 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Telah Ditentukan Penggunaannya Appropriated
Saldo Awal  1.583.494.837.349  920.938.115.937  Beginning Balance
Penambahan Dana Cadangan 88.899.090.863  662.556.721.412  Addition on Reserved Fund
Saldo Akhir 1.672.393.928.212 1.583.494.837.349 Ending Balance

Belum Ditentukan Penggunaannya Unappropiated


Saldo Awal Tahun 8.763.909.422.956  5.760.142.991.677  Beginning Balance
Dividen (990.709.507.966) (776.342.383.468) Dividend
Pembentukan Cadangan Umum (88.899.090.863) (662.556.721.412) Allocation to General Reserve
Laba Bersih 1.150.330.832.978  3.962.838.031.865  Net Income
Pengukuran Kembali Program Remeasurement of Defined
Imbalan Pasti 3.817.342.992  27.790.965.459  Benefit Plans
Penyesuaian atas Perubahan Kepemilikan Adjustment for Ownership Changes
atas Entitas Anak --  452.036.538.835  in Subsidiaries
Saldo Akhir Tahun 8.838.449.000.097 8.763.909.422.956 Ending Balance
   
Berdasarkan  risalah  Rapat  Umum  Pemegang  Saham    Based  on  the  Minutes  of  the  Annual  General 
Tahunan  (RUPST)  tanggal  9  Mei  2019,  pemegang  Meeting  of  Shareholders  (AGS)  dated  May  9, 
saham  menyetujui  pembagian  dividen  tunai  sebesar  2019, the shareholders approved the distribution of 
Rp 990.709.507.966 dan dana untuk PKBL tahun 2019  cash  dividend  amounted  to  Rp 990,709,507,966 
dihitung  maksimal  2%  dari  laba  bersih  tahun  buku  and the fund of CSR in 2019 calculated maximum 
2018 dan menjadi beban ditahun berjalan.   2%  of  the  net  profit  fiscal  year  2018  and  became 
expenses in current year. 
     
Berdasarkan Akta Notaris No. 46 tanggal 24 April 2019    Based  on  Notarial  Deed  No.  46  dated  April  24, 
dari  Notaris  Fathiah  Helmi  S.H.,  pemegang  saham  2019  of  Notary  Fathiah  Helmi  S.H.,  
menyetujui  untuk  membentuk  cadangan  umum  atas  the  shareholders  approved  to  provide  general 
penggunaan  laba  bersih  WBP  tahun  2018  sebesar   reserve  from  WBP’s  profits  in  2018  amounted  to 
Rp  55.173.639.409  dan  pembagian  dividen  tunai  Rp  55,173,639,409  and  distribution  of  cash 
sebesar Rp 551.607.222.015.  dividend amounted to Rp 551,607,222,015. 
     
Berdasarkan Akta Notaris No 59 tanggal 15 April 2019    Based on the Notarial Deed No. 59 dated April 15, 
dari  Notaris  Ariani  Lakhsmijati  Rachim,  S.H.,  2019  of  Notary  Ariani  Lakhsmijati  Rachim,  S.H., 
pemegang  saham  menyetujui  untuk  membentuk  the  shareholders  approved  to  provide  general 
cadangan  umum  atas  penggunaan  laba  bersih  WKR  reserve  from  the  WKR's  profits  in  2018  amounted 
tahun 2018 sebesar Rp 33.725.451.454.  to Rp 33,725,451,454. 
     
Berdasarkan  risalah  Rapat  Umum  Pemegang  Saham    Based  on  the  Minutes  of  the  Annual  General 
Tahunan  (RUPST)  tanggal  06  April  2018,  pemegang  Meeting  of  Shareholders  (AGS)  dated  April  6, 
saham menyetujui untuk membentuk cadangan umum  2018,  the  shareholders  approved  to  provide 
atas  penggunaan  laba  Perusahaan  tahun  2017  general  reserve  from  the  Company's  profits  in 
sebesar Rp 662.556.721.412, pembagian dividen tunai  2017  amounted  to  Rp  662,556,721,412, 
sebesar  Rp  776.342.383.468  dan  dana  untuk  PKBL  distribution  of  cash  dividend  amounted  to 
tahun  2018  dihitung  maksimal  2%  dari  laba  bersih  Rp 776,342,383,468  and  the  fund of  CSR in  2018 
tahun buku 2017 dan menjadi beban ditahun berjalan.   calculated maximum 2% of the net profit fiscal year 
2017 and became expenses in current year. 
     
Berdasarkan  Akta  Penyertaan  Keputusan  RUPST     Based  on  +the  Deed  of  Statement  of  the  Annual 
No. 7 tanggal 5 April 2018 dari  Notaris Fathiah Helmi,  General  Meeting  of  Shareholders  (AGS)  No.  7 
S.H.,  pemegang  saham  menyetujui  untuk  membentuk  dated April 5, 2018 of  Notary Fathiah Helmi,  S.H., 
cadangan  umum  atas  penggunaan  laba  bersih   shareholders approved  to  provide general  reserve 
WBP tahun 2017 sebesar Rp 50.016.507.525.  from  the  WBP's  profits  in  2017  amounted  to    
Rp 50,016,507,525. 
     
Berdasarkan  Akta  No  16  tanggal  21  Maret  2018  dari    Based  on  the  Deed  of  Statement  of  the  Annual 
Notaris  Ariani  Lakhsmijati  Rachim,  S.H.,  pemegang  General  Meeting  of  Shareholders  (AGS)  No.  16 
saham menyetujui untuk membentuk cadangan umum  dated March 21, 2018 of Notary Ariani Lakhsmijati 
atas  penggunaan  laba  bersih  WKR  tahun  2017  Rachim,  S.H.,  shareholders  approved  to  provide 
sebesar Rp 25.484.482.115.  general  reserve  from  the  WKR's  profits  in  2017 
amounted to Rp 25,484,482,115. 
     
Perusahaan  dan  entitas  anak  membuat  penyisihan    The  Company  and  subsidiaries  provided 
untuk  cadangan  umum  sesuai  dengan  UU  No.  40  appropriation  to  general  reserve  in  accordance 
tahun  2007  mengenai  Perusahaan  Terbatas.  UU  with  Law  No.  40  year  2007  concerning  Limited 

192
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
tersebut  mengharuskan  Perusahaan  di  Indonesia  Company.  The  law  requires  companies  in 
untuk membuat penyisihan cadangan umum sekurang- Indonesia  to  provide  a  general  reserve  at  least 
kurangnya  20%  dari  jumlah  modal  yang  ditempatkan  20%  of  the  issued  and  fully  paid  capital.  Reserve 
dan  disetor  penuh.  Dana  cadangan  diadakan  untuk  funds  should  be  maintained  to  cover  suffered 
menutupi  kerugian  yang  diderita  dan  dapat  losses  and  can  be  used  as  working  capital  and 
dipergunakan  sebagai  modal  kerja  dan  tujuan  lain  other purposes by the decision of the AGS. 
menurut keputusan RUPS. 
     
39. PENDAPATAN USAHA   39. REVENUES 
 
30 September/ September 30,
2019 2018
Rp Rp

Jasa Konstruksi/ Construction Services 20.253.448.600.927         34.698.847.905.990 


Penjualan Precast/ Precast  Sales  1.146.373.465.188           1.295.681.043.299 
Pendapatan Jalan Tol/ Toll Road Revenue 352.638.636.450                44.075.325.000 
Pendapatan Property/ Property Revenue 193.642.454.748              110.477.928.990 
Penjualan Energi/ Energy Revenue 37.815.265.259                49.604.832.229 
Pendapatan Hotel/ Hotel Revenue 30.123.488.165                26.680.255.203 
Sewa Gedung dan Peralatan/ Buildings and Equipment Rental 854.501.367                  7.158.962.730 
Jumlah/ Total 22.014.896.412.104 36.232.526.253.441
 
Rincian pendapatan usaha adalah sebagai berikut:    The details of the revenues are as follows: 
     
30 September/ September 30,
2019 2018
Rp Rp
Pihak Berelasi/ Related Parties
PT Jasamarga Jalan Layang Cikampek 1.893.542.732.797  1.493.186.731.822 
PT Hutama Karya (Persero) 1.986.362.113.236  7.191.821.287.807 
PT Perusahaan Listrik Negara (Persero) 1.616.294.376.513  788.935.447.712 
PT Cinere Serpong Jaya 468.768.589.699  913.197.748.758 
PT Angkasa Pura II (Persero) 404.439.575.664  208.185.847.709 
PT Hutama Marga Waskita 215.674.440.612  -- 
PT Trans Jawa Paspro Jalan Tol 198.625.116.034  1.057.143.540.793 
PT Jasamarga Solo Ngawi 171.540.422.951  1.956.987.907.700 
PT Jasamarga Semarang Batang 164.010.175.361  3.365.760.762.508 
PT Jasamarga Japek Selatan 126.556.690.112  -- 
PT Angkasa Pura I (Persero) 123.144.694.349  664.858.159.662 
PT Sarana Multi Infrastruktur (Persero) 55.139.338.186  -- 
PT Pejagan Pemalang Tol Road --  1.208.073.776.359 
PT Pelabuhan Indonesia II (Persero) --  405.260.710.614 
PT Jasamarga Ngawi Kertosono Kediri --  164.196.227.968 
PT Prima Multi Terminal (Pelindo) --  134.250.267.434 
KSO Waskita Triniti 2 --  61.025.936.672 
KSO/ JO  RNI Waskita --  128.802.398.004 
Lain-lain/ Others  (di bawah/ below  Rp 50 Milyar/ Billion ) 173.126.952.182  1.877.720.478 
Sub Jumlah/ Sub Total 7.597.225.217.696 19.743.564.472.000
Pihak Ketiga/ Third Parties
BPJT - PT Cibitung Tanjung Priok Port Tollways 2.710.336.726.930  1.116.289.092.543 
BPJT - PT Waskita Bumi Wira 2.116.233.454.428  2.265.583.894.835 
BPJT - PT Waskita Sriwijaya Tol (dh/ formerly  PT Sriwijaya Markmore Persada) 2.291.502.174.719  2.869.191.833.003 
BPJT - PT Cimanggis Cibitung Tollways 1.996.456.291.853  1.121.230.548.887 
BPJT - PT Kresna Kusuma Dyandra Marga 1.173.723.525.107  786.294.686.644 
Kementerian Pekerjaan Umum dan Perumahan Rakyat/ 
The Ministry of Public Works and Housing 572.705.599.857  820.872.758.677 
Kementerian Perhubungan/ The Ministry of Transportation 510.523.148.072  -- 
BPJT - PT Trans Jabar Tol 386.098.340.219  1.339.514.871.522 
PT Marga Trans Nusantara 229.799.739.381  755.276.349.062 
PT Kukuh Mandiri Lestari 210.220.193.241  94.074.912.309 
BPJT - PT Pemalang Batang Toll Road 135.150.520.480  2.353.453.899.314 
KSO Hutama-Marga-Waskita 63.236.060.854  -- 
Kementerian Perhubungan/ The Ministry of Transportation --  1.631.346.661.379 
Kementerian Pekerjaan Umum Republik Timor Leste/
The Ministry of Public Work of Republica Democratica de Timor Leste --  73.543.797.614 
Kementerian Ristek dan Pendidikan Tinggi RI/ 
The Ministry of Research, Technology and Higher Education of Republic Indonesia --  193.048.219.190 
Pemerintah Daerah/ District Governments --  85.219.247.467 
Lain-lain/ Others  (di bawah/ below  Rp 50 Milyar/ Billion ) 2.021.685.419.267  984.021.008.995 
Sub Jumlah/ Sub Total 14.417.671.194.408 16.488.961.781.441
Jumlah/ Total 22.014.896.412.104 36.232.526.253.441
 
 
 

193
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Rincian  pemberi  kerja  dengan  nilai  kontribusi  Details  of  the  project  owners  with  contribution 
pendapatan  melebihi  10%  dari  pendapatan  usaha  value exceding 10% of the Company revenues for 
Perusahaan untuk tanggal 30 September 2019 dan 2018  September 30, 2019 and 2018 are as follows: 
sebagai berikut: 
   
30 September/ September 30,
2019 2018
Rp Rp
BPJT - PT Cibitung Tanjung Priok Port Tollways 2.710.336.726.930  -- 
BPJT - PT Waskita Sriwijaya Tol (dh/ formerly  PT Sriwijaya Markmore Persada) 2.291.502.174.719  -- 
PT Hutama Karya (Persero) --  7.191.821.287.807 
Jumlah/ Total 5.001.838.901.649 7.191.821.287.807
 
 
40. BEBAN POKOK PENDAPATAN   40. COST OF REVENUES 
 
30 September/ September 30,
2019 2018
Rp Rp
Jasa Konstruksi Construction Services
Bahan Baku 4.054.857.509.135 8.613.871.850.714 Raw Material
Subkontraktor 4.242.183.694.711 9.517.115.900.225 Subcontractor
Upah 1.445.162.315.657 1.785.670.401.687 Wages
Beban Tidak Langsung 6.866.997.943.936 8.164.356.651.166 Indirect Costs
Jumlah Jasa Konstruksi 16.609.201.463.439 28.081.014.803.792 Total Constructions Services

Jalan Tol 127.935.305.824 31.181.401.401 Toll Roads

Properti dan Hotel 172.568.986.618 110.492.402.684 Property and Hotel

Energi 8.034.127.726 12.082.331.146 Energy

Produk Beton Concrete Products
Persediaan Awal 464.822.769.306 52.480.026.028 Beginning Balance
Pembelian 229.802.993.644 145.599.609.345 Purchases
Barang tersedia untuk Dijual 694.625.762.949 198.079.635.373 Goods Available for Sale
Persediaan Akhir 358.211.395.986 175.398.696.413 Ending Balance
Beban Bahan Baku 336.414.366.963 22.680.938.960 Raw Material Expenses
Beban Upah 36.549.129.003 11.174.612.904 Direct Labour Expenses
Beban Overhead 567.903.830.592 890.082.827.554 Overhead Expenses
Jumlah Produk Beton 940.867.326.558 923.938.379.418 Total Concrete Products
Jumlah Beban Pokok Pendapatan 17.858.607.210.165 29.158.709.318.441 Total Cost of Revenues
 
41. BEBAN PENJUALAN DAN BEBAN UMUM DAN   41. SELLING EXPENSES AND GENERAL AND
ADMINISTRASI ADMINISTRATIVE EXPENSES 
 
30 September/ September 30,
2019 2018
Rp Rp
Beban Penjualan/ Selling Expenses
Pemasaran/ Marketing 17.386.198.704                20.090.616.003 
Tender/ Tender 14.561.618.390                10.917.592.620 
Iklan/ Advertising 6.061.906.620  2.625.167.413 
Sub Jumlah/ Sub Total 38.009.723.714 33.633.376.036
Beban Umum dan Administrasi/
General and Administrative Expenses
Gaji Pegawai/ Employee's Salaries 359.850.095.820  285.560.616.725 
Umum/ General 112.943.676.904  93.843.136.538 
Penyusutan (Catatan 16)/ Depreciation (Note 16) 50.761.290.440  32.692.696.798 
Kantor/ Office 38.225.598.557  27.772.478.560 
Perjalanan Dinas/ Travelling 41.632.862.542  33.133.939.353 
Gedung/ Building 30.266.372.053  24.130.853.907 
Jamsostek/ Jamsostek 10.670.995.985  10.485.446.796 
Pesangon/ Severance 30.203.267.833  263.876.817.751 
Penyisihan Kerugian Penurunan Nilai Piutang/ Allowance
For Impairment Losses of Receivable  9.313.181.652  19.687.119.520 
Bonus/THR / Bonus/ THR Allowance 27.749.285.669  19.274.371.695 
DPLK/ DPLK 36.986.174  367.353.759 
Lain-lain/ Others 25.136.060.896  302.698.341.810 
Sub Jumlah/ Sub Total 736.789.674.525 1.113.523.173.213
Jumlah/ Total 774.799.398.239 1.147.156.549.249
 

194
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
42. PENDAPATAN LAIN-LAIN   42. OTHER INCOME 
 
30 September/ September 30,
2019 2018
Rp Rp
Pemulihan Piutang/ Recovery of Receivables 52.138.533.962  27.408.373.732 
Lain-lain KSO/ Others JV 21.041.228.513  13.658.017.641 
Lain-lain Proyek/ Others Project 210.663.641.178  9.074.340.085 
Klaim Asuransi/ Insurance Claims  532.993.960  13.230.699 
Lain-lain/ Others  91.645.758.286  1.786.013.175.799 
Jumlah/ Total 376.022.155.899 1.836.167.137.956
 
Pendapatan lain-lain terutama diperoleh dari keuntungan    Other  incomes was derived primarily from gain on 
penjualan  sebagian  penyertaan  pada  PT  Waskita  sale of part of ownership in PT Waskita Transjawa 
Transjawa  Tol  Road  kepada  Reksa  Dana  Penyertaan  Tol  Road  to  Limited  Investment  Fund  (RDPT)  on 
Terbatas  (RDPT)  pada  tanggal  10  April  2018  sebesar  April 10, 2018 amounted to Rp 1,651,094,347,539. 
Rp 1.651.094.347.539. 
 
43. BEBAN LAIN-LAIN   43. OTHER EXPENSES 
 
30 September/ September 30,
2019 2018
Rp Rp
Beban Lain-lain KSO/ Others JV Expenses 20.089.717.300  47.415.947.546 
Beban dan Denda Pajak/ Tax Expenses and Penalty  24.210.707.979  207.790.682.119 
Beban Lain-lain Proyek/ Others Project Expenses 15.524.357.499  1.875.203.509 
Lain-lain/ Others  2.054.400.669  16.972.901.931 
Jumlah/ Total 61.879.183.447 274.054.735.105
 
44. BEBAN KEUANGAN   44. FINANCIAL CHARGES 

Akun ini merupakan beban bunga atas utang bank/ non-   This account represents group’s interest expenses 
bank,  beban  provisi,  dan beban  administrasi  bank  yang  on  bank  loans/  non-banks,  provision  fees,  and 
terkait dengan perolehan pinjaman Grup selama periode  administrative  expenses  related  to  the  acquisition 
berjalan  setelah  dikurangi  biaya  bunga  yang  secara  of  bank  loans  during  the  current  period  after 
langsung  dapat  diatribusikan  dengan  biaya  perolehan  deducting  the  interest  costs  which  are  directly 
suatu proyek tertentu yang memenuhi syarat dan beban  attributable  to  the  cost  of  a  qualifying  project  and 
bunga atas utang obligasi Perusahaan.  the interest expense on debt Corporate bonds. 

45. BAGIAN LABA (RUGI) BERSIH ENTITAS ASOSIASI   45. EQUITY IN NET INCOME (LOSS) OF
DAN VENTURA BERSAMA ASSOCIATES AND JOINT VENTURES 
 
30 September/ September 30,
2019 2018
Rp Rp

Bagian Laba Bersih Ventura Equity in Net Income of
Bersama Konstruksi (Catatan 13) 191.872.320.736  164.244.996.403  Construction  Joint Ventures (Note 13)
Bagian Laba (Rugi) Bersih Equity in Net Income (Loss) of
Entitas Asosiasi (Catatan 13) (198.200.929.818) (129.713.990.965) Associates Entities (Note 13)

Jumlah (6.328.609.082) 34.531.005.438 Total


 
 
 
 
 
 
 
 
 
 
 
 
 
 

195
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
46. KEPENTINGAN NON-PENGENDALI   46. NON-CONTROLLING INTEREST 
   
30 September/ September 30, 2019
Bagian Laba (Rugi) Penambahan
Nilai Awal/ Tahun Berjalan/ (Pengurangan)/ Nilai Akhir/
Kepemilikan/ Beginning Profit (Loss) Additional Ending
Ownership Balance Current Year (Deduction) Balance
% Rp Rp Rp Rp

Masyarakat Umum (Untuk/ for  WBP) 40,00% 4.871.879.999.188  204.693.572.147  (195.731.595.000) 4.880.841.976.335 


PT Sarana Multi Infrastruktur (Untuk/ for  WTR) 12,46% 2.510.058.087.631  (88.765.149.565) 165.754.555.272  2.587.047.493.338 
PT Dana Tabungan dan Asuransi Negeri (Persero) (Untuk/ for  WTR) 10,23% 2.045.632.252.472  (72.861.096.996) --  1.972.771.155.476 
PT Sumber Mitra Jaya (Untuk/ for  PBTR) 40,00% 809.759.717.909  (97.070.528.434) --  712.689.189.475 
PT Akses Pelabuhan Indonesia (Untuk/ for  CTP) 45,00% 417.360.969.654  1.328.366.001  133.447.860.000  552.137.195.655 
PT Bagasasi Inti Pratama (untuk/ for  WMR) 40,00% 160.581.870.537  (197.019.752) 124.608.000.000  284.992.850.785 
PT Graha Jasa Ekatama (Untuk/ for  WFPR) 40,00% 34.287.298.623  6.740.479.288  --  41.027.777.911 
PT Shalawat Power (Untuk/ for  WSE) 6,00% 15.862.734.475  (523.106.635) --  15.339.627.840 
PT Jasa Marga (Persero) Tbk (Untuk/ for  KKDM) 0,46% 6.024.308.232  (938.964.374) --  5.085.343.858 
PT Bakrie and Brothers Tbk (Untuk/ for  CCT) 5,00% 3.478.360.767  57.497.748  --  3.535.858.515 
PT Bakrie Toll Indonesia (Untuk/ for  CCT) 5,00% 3.478.360.767  57.497.748  --  3.535.858.515 
PT Panca Wira Usaha (Untuk/ for  WBW) 0,19% 2.856.196.707  2.260.282  --  2.858.456.989 
Perusahaan Daerah Prodexim (Untuk/ for  WST (dh/ formerly  SRIMP)) 1,00% 2.562.376.520  12.957.830  --  2.575.334.350 
PT Kaltim Binasarana Konstruksi (Untuk/ for  TTB) 20,00% 1.593.411.839  42.006.375  --  1.635.418.214 
Perusda Benuo Taka (Untuk/ for   TTB) 15,00% 1.195.058.879  31.504.781  --  1.226.563.660 
PT Bukaka Mega Investama (Untuk / for  SMR) 0,00% 1.077.033.715  --  --  1.077.033.715 
Kayson Company (Untuk/ for WST (dh/ formerly  SRIMP)) 5,00% 945.603.312  --  --  945.603.312 
PT Bukaka Mega Investama (Untuk/ for  TJT) 10,14% 154.284.720  --  --  154.284.720 
PT Bukaka Mega Investama (Untuk/ for  TPJT) 0,00% 144.413.504  --  --  144.413.504 
Perusda Komaba (Untuk/ for  TTB) 5,00% --  10.501.594  --  10.501.594 
Koperasi Waskita (Untuk/ for  WBP) 0,01% 2.721.050  270.512  --  2.991.562 
Koperasi Waskita (Untuk/ for  TJT) 0,00% 2.469.663  (1.796.621) 500.000  1.173.042 
Koperasi Waskita (Untuk/ for  WKR) 0,01% 1.088.970  32.083  --  1.121.053 
Koperasi Waskita (Untuk/ for  WWE) 0,05% (633.103) --  --  (633.103)
PT Sriwijaya Marga Persada (Untuk/ for  WST (dh/ formerly  SRIMP)) 0,81% (104.112.806) --  --  (104.112.806)
Koperasi Waskita (Untuk/ for  PT WKI (dh/ formerly  WKE) 0,01% (143.219.146) (29.755) --  (143.248.901)
PT Jasa Sarana (Untuk/ for  TJT) 8,21% (153.701.404) --  --  (153.701.404)
Koperasi Waskita (Untuk/ for  WTR) 0,01% (677.676.817) --  --  (677.676.817)
PT Persada Tanjung Api-api (Untuk/ for  WST (dh/ formerly  SRIMP)) 1,00% (1.856.590.368) --  --  (1.856.590.368)
-- 
Jumlah/ Total 10.886.002.685.490 (47.380.745.743) 228.079.320.272 11.066.701.260.019
 
31 Desember/ December 31, 2018
Bagian Laba (Rugi) Penambahan
Nilai Awal/ Tahun Berjalan/ (Pengurangan)/ Nilai Akhir/
Kepemilikan/ Beginning Profit (Loss) Additional Ending
Ownership Balance Current Year (Deduction) Balance
% Rp Rp Rp Rp

Masyarakat Umum (Untuk/ for  PT WBP) 40,00% 4.696.707.852.445  441.389.048.815  (266.216.902.072) 4.871.879.999.188 


PT Sarana Multi Infrastruktur (Untuk/ for  PT WTR) 12,46% 1.700.117.589.640  119.286.732.519  690.653.765.472  2.510.058.087.631 
PT Dana Tabungan dan Asuransi Negeri (Persero) (Untuk/ for  PT WTR) 10,23% 1.947.718.124.788  97.914.127.684  --  2.045.632.252.472 
PT Sumber Mitra Jaya (Untuk/ for  PT PBTR) 40,00% 270.365.887.834  (3.683.813.829) 543.077.643.904  809.759.717.909 
PT Akses Pelabuhan Indonesia (Untuk/for PT CTP) 45,00% 96.738.504.404  2.866.845.250  317.755.620.000  417.360.969.654 
PT Bagasasi Inti Pratama (untuk/ for PT WMR) 40,00% --  73.870.537  160.508.000.000  160.581.870.537 
PT Graha Jasa Ekatama (Untuk/ for PT WFPR) 40,00% --  (238.701.377) 34.526.000.000  34.287.298.623 
PT Shalawat Power (Untuk/ for  PT WSE) 6,00% 14.717.535.613  1.145.198.862  --  15.862.734.475 
PT Jasa Marga (Persero) Tbk (Untuk/ for  PT KKDM) 0,46% 4.829.368.268  44.939.964  1.150.000.000  6.024.308.232 
PT Bakrie and Brothers Tbk (Untuk/ for  PT CCT) 5,00% 3.384.531.747  93.829.020  --  3.478.360.767 
PT Bakrie Toll Indonesia (Untuk/ for  PT CCT) 5,00% 3.384.531.747  93.829.020  --  3.478.360.767 
PT Panca Wira Usaha (Untuk/ for  PT WBW) 0,19% 2.854.508.513  1.688.194  --  2.856.196.707 
Perusahaan Daerah Prodexim (Untuk/ for  PT Srimp) 1,00% 4.185.378.731  (1.623.002.211) --  2.562.376.520 
PT Kaltim Binasarana Konstruksi (Untuk/ for  PT TTB) 20,00% --  93.411.839  1.500.000.000  1.593.411.839 
Perusda Benuo Taka (Untuk/ for  PT TTB) 15,00% --  70.058.879  1.125.000.000  1.195.058.879 
PT Bukaka Mega Investama (Untuk / for  SMR) 0,00% 678.680.755  23.352.960  375.000.000  1.077.033.715 
Kayson Company (Untuk/ for  PT Srimp) 5,00% 945.603.312  --  --  945.603.312 
PT Bukaka Mega Investama (Untuk/ for  TJT) 10,14% 153.701.404  583.316  --  154.284.720 
PT Bukaka Mega Investama (Untuk/ for  TPJT) 0,00% 143.830.631  82.873  500.000  144.413.504 
Koperasi Waskita (Untuk/ for  PT WBP) 0,01% 2.647.862  73.188  --  2.721.050 
Koperasi Waskita (Untuk/ for  PT TJT) 0,00% 2.469.663  --  --  2.469.663 
Koperasi Waskita (Untuk/ for  PT WKR) 0,01% 1.059.399  29.571  --  1.088.970 
PT Energi Bumi Mining (Untuk/ for  PT WBW) 0,00% 3.568.135.641  --  (3.568.135.641) -- 
Koperasi Waskita (Untuk/ for  PT WWE) 0,05% (633.103) --  --  (633.103)
PT Sriwijaya Marga Persada (Untuk/ for  PT Srimp) 0,81% (104.112.806) --  --  (104.112.806)
Koperasi Waskita (Untuk/ for  PT WKE) 0,01% 611.485  (143.830.631) --  (143.219.146)
PT Jasa Sarana (Untuk/ for  TJT) 8,21% (153.701.404) --  --  (153.701.404)
Koperasi Waskita (Untuk/ for  PT WTR) 0,01% 1.003.938  (678.680.755) --  (677.676.817)
PT Persada Tanjung Api-api (Untuk/ for  PT Srimp) 1,00% (1.856.590.368) --  --  (1.856.590.368)
-- 
Jumlah/ Total 8.748.386.520.139 656.729.673.688 1.480.886.491.663 10.886.002.685.490

196
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
   

47. LABA PER SAHAM   47. EARNING PER SHARE 

Berikut  ini  adalah  data  yang  digunakan  untuk    Following  the  details  of  the  calculation  of  basic 
perhitungan laba per saham dasar:  earning per share: 
     
30 September/ September 30,
2019 2018
Rp Rp
Laba Bersih yang Diatribusikan Net Income Attributable
Kepada Entitas Induk 1.150.330.832.978  3.745.402.921.873  to Parent Entity
Rata - rata Bertimbang Saham 13.573.902.600  13.573.902.600  Weighted Average of Shares
Laba Per Saham Dasar 84,75 275,93 Basic Earning Per Shares

48. BANK GARANSI DAN LETTER OF CREDIT   48. BANK GUARANTEE AND LETTER OF CREDIT 
 
Pada  tanggal  30  September  2019  dan  31  Desember  As  of  September  30,  2019  and  December  31, 
2018  Perusahaan  telah  mendapatkan  fasilitas  bank  2018  the  Company  has  obtained  the  bank 
garansi, L/C dan SKBDN sebagai berikut:  guarantees, LC and SKBDN  facility as follows: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
Perusahaan/ the Company
PT Bank Rakyat Indonesia (Persero) Tbk 3.800.000.000.000  4.600.000.000.000 
PT Bank Mandiri (Persero) Tbk  4.000.000.000.000  4.500.000.000.000 
PT Bank Negara Indonesia (Persero) Tbk 1.345.000.000.000  2.145.000.000.000 
Indonesia Eximbank 500.000.000.000  500.000.000.000 
Pihak Ketiga/ Third Parties
Perusahaan/ the Company
PT Bank Pan Indonesia Tbk  2.500.000.000.000  2.500.000.000.000 
PT Bank UOB Indonesia  1.200.000.000.000  1.200.000.000.000 
PT Bank Mizuho Indonesia  1.000.000.000.000  1.000.000.000.000 
PT Bank BTPN Tbk (d/h /formerly  PT Bank Sumitomo Mitsui Indonesia) 950.000.000.000  950.000.000.000 
PT Bank BNP Paribas Indonesia 500.000.000.000  500.000.000.000 
The Bank of Tokyo Mitsubishi UFJ  300.000.000.000  300.000.000.000 
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk  250.000.000.000  250.000.000.000 
PT Bank HSBC Indonesia 250.000.000.000  250.000.000.000 
PT Bank DBS Indonesia  250.000.000.000  250.000.000.000 
PT Bank Maybank Indonesia Tbk 175.000.000.000  175.000.000.000 
Jumlah/ Total 17.020.000.000.000 19.120.000.000.000

Perusahaan  juga  memiliki  fasilitas  bank  garansi,  L/C  The Company also obtained bank guarantess, L/C 


dan SKBDN yang telah digunakan sebagai berikut:  and  SKBDN  facilities  with  the  total  usage  as 
follows: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Pihak Berelasi/ Related Parties
Perusahaan/ the Company
PT Bank Mandiri (Persero) Tbk           1.572.091.061.923  2.642.923.446.482 
PT Bank Rakyat Indonesia (Persero) Tbk          2.190.997.270.142  2.453.957.965.478 
PT Bank Negara Indonesia (Persero) Tbk             918.021.800.417  1.405.621.957.329 
Indonesia Eximbank 461.806.507.428  182.948.208.516 
Pihak Ketiga/ Third Parties
Perusahaan/ the Company
PT Bank Maybank Indonesia Tbk 19.485.822.428  -- 
Jumlah/ Total 5.162.402.462.338 6.685.451.577.805

197
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
   

49. SUPPLY CHAIN FINANCING (SCF)   49. SUPPLY CHAIN FINANCING (SCF) 
 
Perusahaan  dan  entitas  anak  memiliki  fasilitas  SCF  The  Company  and  a  subsidiary  obtained  SCF 
yang  digunakan  untuk  membayar  tagihan  mitra  kerja  facilities were used to pay working partners’ bill as 
sebagai berikut:  follows: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
PT Bank Negara Indonesia (Persero) Tbk - OAF 2.775.000.000.000  2.775.000.000.000 
PT Bank Mandiri (Persero) Tbk - SCF 2.006.000.000.000  2.006.000.000.000 
PT Bank Rakyat Indonesia (Persero) Tbk  - BPF 1.200.000.000.000  1.700.000.000.000 
PT Bank OCBC NISP Tbk 1.500.000.000.000  1.500.000.000.000 
PT Bank Syariah Mandiri - SCF 1.000.000.000.000  1.000.000.000.000 
PT Bank Mizuho Indonesia 1.000.000.000.000  1.000.000.000.000 
PT Bank UOB Indonesia 322.684.570.133  864.000.000.000 
PT Bank HSBC Indonesia 650.000.000.000  650.000.000.000 
PT Bank BNI Syariah - SCF 500.000.000.000  500.000.000.000 
PT Bank Danamon Indonesia Tbk 500.000.000.000  500.000.000.000 
The Bank of Tokyo Mitsubishi UFJ 300.000.000.000  300.000.000.000 
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk 250.000.000.000  250.000.000.000 
PT Bank DBS Indonesia  250.000.000.000  -- 
Jumlah/ Total 12.253.684.570.133 13.045.000.000.000
 
Pada  tanggal  30  September  2019  dan  31  Desember  As of September 30, 2019 and December 31, 2018 
2018  jumlah  penggunaan  fasilitas  tersebut  sebagai  the  total  amounts  of  facility  utilized,  were  as 
berikut:  follows: 
   
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
PT Bank Negara Indonesia (Persero) Tbk - OAF 2.465.579.319.828  2.459.798.507.008 
PT Bank OCBC NISP Tbk 562.302.243.519  1.261.158.787.788 
PT Bank Mandiri (Persero) Tbk - SCF 1.414.893.330.446  1.517.498.410.650 
PT Bank Rakyat Indonesia (Persero) Tbk  - BPF 1.171.033.883.983  1.304.484.629.753 
PT Bank Syariah Mandiri - SCF 676.413.161.893  838.678.664.339 
PT Bank Mizuho Indonesia 659.722.445.015  784.224.513.312 
PT Bank HSBC Indonesia 482.424.337.215  574.593.187.725 
PT Bank BNI Syariah - SCF 261.901.850.449  498.309.062.219 
PT Bank UOB Indonesia 322.684.570.133  707.440.744.768 
PT Bank DBS Indonesia  191.616.786.497  -- 
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk 246.862.793.763  249.949.771.132 
PT Bank Danamon Indonesia Tbk --  485.002.489.220 
The Bank of Tokyo Mitsubishi UFJ --  244.041.438.137 
Jumlah/ Total 8.455.434.722.741 10.925.180.206.051

   
Pada  tanggal  pelaporan,  penggunaan  fasilitas  SCF  As  of  reporting  date,  the  total  amounts  of  SCF 
masih tercatat dalam utang usaha.  facility utilized are recognized in accounts payable. 
   
50. REKONSILIASI LIABILITAS YANG TIMBUL DARI   50. RECONCILIATION OF LIABILITIES ARISING
AKTIVITAS PENDANAAN FROM FINANCING ACTIVITIES 
 
Tabel  di  bawah  ini  menjelaskan  perubahan  dalam  The  table  below  explains  the  changes  in 
liabilitas  Grup  yang  timbul  dari  aktivitas  pendanaan,  the  Group’s  liabilities  arising  from  financing 
termasuk  perubahan  yang  timbul  dari  arus  kas  dan  activities,  including  both  cash  and  non-cash 
perubahan  nonkas.  Liabilitas  yang  timbul  dari  aktivitas  changes. Liabilities arising from financing activities 
pendanaan  adalah  liabilitas  yang  arus  kas,  atau  arus  are those for which cash flows were, or future cash 
kas  masa  depannya,  diklasifikasikan  dalam  laporan  flows will be, classified in the Group’s consolidated 
arus  kas  konsolidasian  Grup  sebagai  arus  kas  dari  statement  of  cash  flows  as  cash  flows  from 
aktivitas pendanaan.  financing activities. 
   

198
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Perubahan Transaksi
Arus Kas dari Aktivitas Pendanaan/ non Kas/
1 Januari/ Financing Cash Flows Non-cash Changes 30 September/
January 1, Penambahan/ Pembayaran/ Biaya Emisi/ Amortisasi/ September 30,
2019 Additional Payment Issuance cost Amortization 2019
Rp Rp Rp Rp Rp Rp

Pinjaman bank 49.128.001.155.353  74.141.013.330.846  (58.000.340.312.899) --  --  65.268.674.173.300  Bank Loans


Utang Lembaga Keuangan Non-Bank 554.403.429.023             280.360.376.007  --  --  --  834.763.805.030  Loan to Financial Institution Non-Bank 
Utang obligasi 13.848.654.171.754  2.341.888.591.669  (2.000.000.000.000) (2.466.600.000) 3.543.763.420  14.191.619.926.843  Bonds  Payable
Surat Utang Jangka Menengah 1.112.204.218.768  507.168.580.280  (500.852.934.774) 1.021.255.227  24.169.539.568  1.143.710.659.069  Medium Term Notes
Jumlah 64.643.262.974.898 77.270.430.878.802 (60.501.193.247.673) (1.445.344.773) 27.713.302.988 81.438.768.564.242 Total

Perubahan Transaksi
Arus Kas dari Aktivitas Pendanaan/ non Kas/
1 Januari/ Financing Cash Flows Non-cash Changes 31 Desember/
January 1, Penambahan/ Pembayaran/ Biaya Emisi/ Amortisasi/ December 31,
2018 Additional Payment Issuance cost Amortization 2018
Rp Rp Rp Rp Rp Rp

Pinjaman bank 49.128.001.155.353  92.883.247.775.045  (76.717.620.394.733) --  --  49.128.001.155.353  Bank Loans


Utang Lembaga Keuangan Non-Bank 554.403.429.023             879.341.822.975  (2.218.009.712.976) --  --  554.403.429.023  Loan to Financial Institution Non-Bank 
Utang obligasi 13.848.654.141.754  5.154.250.000.000  (350.000.000.000) (5.010.205.814) 4.153.159.044  13.848.654.141.754  Bonds  Payable
Surat Utang Jangka Menengah 1.112.204.218.768  1.144.403.604.859  (786.371.433.625) (26.673.654.668) 60.783.045.653  1.112.204.218.768  Medium Term Notes
Jumlah 64.643.262.944.898 100.061.243.202.879 (80.072.001.541.334) (31.683.860.482) 64.936.204.697 64.643.262.944.898 Total

Pengungkapan  tambahan  atas  aktivitas  investasi    Supplemental  disclosures  on  noncash  investing 
nonkas:  activities: 
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp

Penambahan Aset Tetap Melalui Acquisition of Fixed Asset Through
Utang Usaha  499.245.072.738  1.061.625.707.705  Accounts Payable
Penambahan Aset Takberwujud Melalui Acquisition of Intangible Asset Through
Liabilitas dan Akuisisi 768.102.499.253  8.694.683.900.132  Liabilities and Acquisition

51. ASET DAN LIABILITAS MONETER DALAM MATA   51. MONETARY ASSETS AND LIABILITIES IN
UANG ASING FOREIGN CURRENCY 

Pada  tanggal  30  September  2019  dan  31  Desember    As of September 30, 2019 and December 31, 2018 


2018  Perusahaan  mempunyai  aset  dan  liabilitas  the  Company  have  monetary  assets  and  liabilities 
moneter dalam mata uang asing sebagai berikut:  denominated in foreign currencies were as follows: 
     
30 September/ September 30, 2019 31 Desember/ December 31, 2018
Mata Uang Asing/ Ekuivalen/ Mata Uang Asing/ Ekuivalen/
Foreign Currency Equivalent Foreign Currency Equivalent
Rp Rp
Aset/ Assets
Kas dan Setara Kas/
Cash and Cash Equivalents USD 973.442  13.797.566.687  22.692.374  328.608.262.844 
YEN 59.046.580  7.756.143.191  59.047.146  7.741.972.406 
EURO 3.652  56.601.860  558  9.235.372 
SAR 792  2.990.946  360.610  1.391.735.823 
MYR 3.642  12.328.017  66.465  232.173.987 
Piutang Usaha/
Accounts Receivable SAR 14.026.507  53.000.910.399  13.732.976  53.000.910.399 
USD 170.206  2.412.493.891  626.425  9.071.255.067 
Piutang Retensi/
Retention Receivables SAR 7.827.569  29.577.446.348  7.663.762  29.577.446.348 
USD 10.280.549  145.716.503.510  10.084.073  146.027.455.610 
Tagihan Bruto Kepada Pengguna Jasa/ 
Gross Amount  SAR --  1.946  --  973 
Due From Customers USD 6.132.518  86.922.313.534  7.924.787  114.758.838.085 
Jumlah/ Total 339.255.300.329 690.419.286.914

199
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
52. SEGMEN OPERASI   52. OPERATION SEGMENT 
 
a. Informasi tentang Produk dan Jasa   a. Information Related to Products and
Services

Segmen  operasi  Perusahaan  dikelompokkan    The  Company’s  operation  segment  is  grouped 
berdasarkan pekerjaan yang dilakukan.  based on the work performed. 
   
Informasi Segmen berdasarkan jenis usaha/ produk  Details  of  information  of  segment  based  on 
adalah sebagai berikut: the type of business/ product were as follows: 

30 September/ September 30, 2019


Konstruksi/ Sewa Gedung/ Properti & Hotel/ Beton Pracetak/ Energi/ Tol/ Jumlah/
Constructions Building Rental Property & Hotel Precast Energy Toll Total
Rp Rp Rp Rp Rp Rp Rp
Pendapatan Usaha 20.253.448.600.927  854.501.367  223.765.942.913  1.146.373.465.188  37.815.265.259  352.638.636.450  22.014.896.412.104  Revenues
Beban Pokok Pendapatan 16.609.201.463.439  --  172.568.986.618  940.867.326.558  8.034.127.726  127.935.305.824  17.858.607.210.165  Cost of Revenues
Laba Bruto 3.644.247.137.488  854.501.367  51.196.956.295  205.506.138.630  29.781.137.533  224.703.330.626  4.156.289.201.939  Gross Profit
Tidak Dapat Dialokasikan: Unallocated:
Beban Usaha --  --  --  --  --  --  (774.799.398.239) Operating Expenses
Penghasilan Lain-lain - Bersih --  --  --  --  --  --  1.065.168.550.642  Other Revenues - Net
Beban Lain-lain - Bersih --  --  --  --  --  --  (549.412.645.673) Other Expenses - Net
Laba Sebelum Pajak dan Beban Keuangan --  --  --  --  --  --  3.897.245.708.669  Income Before Tax and Financial Charges
Beban keuangan --  --  --  --  --  --  (2.589.169.641.158) Financial Charges
Bagian Laba Bersih Entitas Asosiasi Equity in Net Income of Associates
dan Ventura Bersama --  --  --  --  --  --  (6.328.609.082) and Joint Ventures
Laba Sebelum Pajak --  --  --  --  --  --  1.301.747.458.429  Income Before Tax
Beban Pajak Penghasilan --  --  --  --  --  --  (198.797.371.194) Income Tax Expenses
Laba Bersih Periode Berjalan 1.102.950.087.235 Net Income in Current Period
 
30 September/ September 30, 2018
Konstruksi/ Sewa Gedung/ Properti & Hotel/ Beton Pracetak/ Energi/ Tol/ Jumlah/
Constructions Building Rental Property & Hotel Precast Energy Toll Total
Rp Rp Rp Rp Rp Rp Rp
Pendapatan Usaha 34.698.847.905.990  7.158.962.730  137.158.184.193  1.295.681.043.299  49.604.832.229  44.075.325.000  36.232.526.253.441  Revenues
Beban Pokok Pendapatan 28.081.014.803.792  --  110.492.402.684  923.938.379.418  12.082.331.146  31.181.401.401  29.158.709.318.441  Cost of Revenues
Laba Bruto 6.617.833.102.198  7.158.962.730  26.665.781.509  371.742.663.881  37.522.501.083  12.893.923.599  7.073.816.935.000  Gross Profit
Tidak Dapat Dialokasikan: Unallocated:
Beban Usaha --  --  --  --  --  --  (1.147.156.549.249) Operating Expenses
Penghasilan Lain-lain - Bersih --  --  --  --  --  --  2.942.631.988.983  Other Revenues - Net
Beban Lain-lain - Bersih --  --  --  --  --  --  (1.670.144.673.502) Other Expenses - Net
Laba Sebelum Pajak dan Beban Keuangan --  --  --  --  --  --  7.199.147.701.232  Income Before Tax and Financial Charges
Beban keuangan --  --  --  --  --  --  (1.946.914.531.560) Financial Charges
Bagian Laba Bersih Entitas Asosiasi Equity in Net Income of Associates
dan Ventura Bersama --  --  --  --  --  --  34.531.005.438  and Joint Ventures
Laba Sebelum Pajak --  --  --  --  --  --  5.286.764.175.110  Income Before Tax
Beban Pajak Penghasilan --  --  --  --  --  --  (773.761.182.684) Income Tax Expenses
Laba Bersih Periode Berjalan 4.513.002.992.426 Net Income in Current Period
 
30 September/ September 30, 2019
Konstruksi/ Sewa Gedung/ Properti & Hotel/ Beton Pracetak/ Energi/ Tol/ Jumlah /
Constructions Building Rental Property & Hotel Precast Energy Toll Total
Rp Rp Rp Rp Rp Rp Rp
Aset Assets
Piutang Usaha 5.764.246.527.688  695.923.299  --  2.121.709.424.963  --  --  7.886.651.875.950  Accounts Receivable
Piutang Retensi 1.500.078.443.798  --  --  --  --  --  1.500.078.443.798  Retention Receivable
Tagihan Bruto Kepada Pengguna Jasa 30.002.374.208.383  --  --  --  --  --  30.002.374.208.383  Gross Amount Due from Customers
Persediaan 540.305.827.481  --  2.732.210.942.524  1.369.682.485.669  --  --  4.642.199.255.674  Inventories
Aset yang Tidak Dapat Dialokasikan --  --  --  --  --  --  93.208.656.230.555  Unallocated Assets
Jumlah Aset 137.239.960.014.360 Total Assets
Liabilitas Liabilities
Utang Usaha 12.912.997.224.235  --  --  --  --  --  12.912.997.224.235  Accounts Payable
Utang Bruto Kepada Pihak Ketiga 2.798.459.952.251  --  --  378.089.437.020  --  --  3.176.549.389.271  Gross Amount Due to Third Parties
Liabilitas yang Tidak Dapat Dialokasikan --  --  --  --  --  --  91.923.819.420.531  Unallocated Liabilities
Jumlah Liabilitas 108.013.366.034.037 Total Liabilities

200
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
31 Desember/ December 31, 2018
Konstruksi/ Sewa Gedung/ Properti & Hotel/ Beton Pracetak/ Energi/ Tol/ Jumlah /
Constructions Building Rental Property & Hotel Precast Energy Toll Total
Rp Rp Rp Rp Rp Rp Rp
Aset Assets
Piutang Usaha 2.043.048.276.262  822.475.571  --  1.724.317.937.821  --  --  3.768.188.689.654  Accounts Receivable
Piutang Retensi 1.333.867.085.150  --  --  --  --  --  1.333.867.085.150  Retention Receivable
Tagihan Bruto Kepada Pengguna Jasa 32.350.733.163.102  --  --  --  --  --  32.350.733.163.102  Gross Amount Due from Customers
Persediaan 820.899.169.547  --  3.039.901.972.185  1.228.429.929.512  --  --  5.089.231.071.244  Inventories
Aset yang Tidak Dapat Dialokasikan --  --  --  --  --  --  81.849.561.614.486  Unallocated Assets
Jumlah Aset 124.391.581.623.636 Total Assets
Liabilitas Liabilities
Utang Usaha 14.905.832.998.966  --  --  --  --  --  14.905.832.998.966  Accounts Payable
Utang Bruto Kepada Pihak Ketiga 6.423.389.324.611  --  --  53.132.173.364  --  --  6.476.521.497.975  Gross Amount Due to Third Parties
Liabilitas yang Tidak Dapat Dialokasikan --  --  --  --  --  --  74.122.108.375.828  Unallocated Liabilities
Jumlah Liabilitas 95.504.462.872.769 Total Liabilities

 
b. Informasi tentang Wilayah Geografis   b. Information Related to the Geographic
 
Grup beroperasi di lima wilayah geografis utama    The Group’s operation are located in five principal 
yang  berlokasi  di  Jakarta  (Catatan  1).  Informasi  geographical  areas  which  located  in  Jakarta  
segmen  berdasarkan  daerah  geografis  adalah  (Note  1).  Information  segment  based  on 
sebagai berikut: geographical area were as follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Aset/Assets 
Konstruksi/Constructions
Divisi Infrastruktur I/ Division Infrastructure I  - Medan               23.356.177.144.680 --
Divisi Infrastruktur II/ Division Infrastructure II  - Jakarta               18.764.007.787.382 --
Divisi Infrastruktur III/ Division Infrastructure III  - Surabaya                 8.871.696.099.296 --
Divisi EPC/ Division EPC  - Jakarta                 6.773.182.865.041 --
Divisi Gedung/ Division Building - Jakarta                 4.709.102.485.069 --
Divisi I/ Division I  - Jakarta -- 6.242.425.879.809 
Divisi III/ Division III  - Jakarta -- 9.828.216.917.791 
Divisi V/ Division V  - Jakarta -- 8.233.860.332.153 
Divisi IV/ Division IV  - Surabaya -- 5.124.813.927.010 
Divisi II/ Division II  - Jakarta -- 5.787.693.031.036 
Divisi VI/ Division VI  - Palembang -- 12.361.523.834.245 
Divisi VII/ Division VII  - Jakarta -- 7.265.062.706.279 
Divisi VIII/ Division VIII  - Jakarta -- 5.086.794.537.848 
62.474.166.381.468 59.930.391.166.171
Properti/ Property
Divisi Realty/ Realty Division  - Jakarta 452.401.602.724  452.539.279.883 
WKR - Jakarta 4.761.683.003.402  4.292.836.496.196 
5.214.084.606.126 4.745.375.776.079

Kantor Pusat/ Head Office  - Jakarta 49.836.040.986.887  41.589.068.835.143 


49.836.040.986.887 41.589.068.835.143
Beton Precast/ Precast 
Divisi Precast/ Precast Division  - Jakarta 82.853.667.184  82.853.667.184 
WBP  - Jakarta 15.795.566.094.855  15.223.020.000.024 
15.878.419.762.039 15.305.873.667.208
Energi/ Energy
WKI (dh/ formerly  WKE) - Jakarta 537.255.956.700  425.851.327.474
537.255.956.700 425.851.327.474
Jalan Tol/ Toll Road
WTR - Jakarta 69.632.170.864.997  57.262.108.475.134
69.632.170.864.997 57.262.108.475.134
Jumlah Sebelum Eliminasi/ Total Before Elimination 203.572.138.558.217 179.258.669.247.209
Eliminasi/ Elimination (66.332.178.543.857) (54.867.087.623.573)
Jumlah Setelah Eliminasi/ Total After Elimination 137.239.960.014.360 124.391.581.623.636
 

201
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Liabilitas dan Ekuitas/ Liabilities and Equities
Konstruksi/Constructions
Divisi Infrastruktur I/ Division Infrastructure I  - Medan 23.356.177.144.680  --
Divisi Infrastruktur II/ Division Infrastructure II  - Jakarta 18.764.007.787.382  --
Divisi Infrastruktur III/ Division Infrastructure III  - Surabaya 8.871.696.099.296  --
Divisi EPC/ Division EPC  - Jakarta 6.773.182.865.041  --
Divisi Gedung/ Division Building - Jakarta 4.709.102.485.069  6.242.425.879.809 
Divisi III/ Division III  - Jakarta --  9.828.216.917.791 
Divisi V/ Division V  - Jakarta --  8.233.860.332.153 
Divisi IV/ Division IV  - Surabaya --  5.124.813.927.010 
Divisi II/ Division II  - Jakarta --  5.787.693.031.036 
Divisi VI/ Division VI  - Palembang --  12.361.523.834.245 
Divisi VII/ Division VII  - Jakarta --  7.265.062.706.279 
Divisi VIII/ Division VIII  - Jakarta --  5.086.794.537.848 
62.474.166.381.468 59.930.391.166.171
Properti/ Property
Divisi Realty/ Realty Division  - Jakarta 452.401.602.724  452.539.279.883 
WKR - Jakarta 4.761.683.003.402  4.292.836.496.196 
5.214.084.606.126 4.745.375.776.079

Kantor Pusat - Jakarta 49.836.040.986.887  41.589.068.835.143 


49.836.040.986.887 41.589.068.835.143
Beton Precast/ Precast 
Divisi Precast/ Precast Division  - Jakarta 82.853.667.184  82.853.667.184
WBP - Jakarta 15.795.566.094.855  15.223.020.000.024
15.878.419.762.039 15.305.873.667.208
Energi/ Energy
WKI (dh/ formerly  WKE) - Jakarta 537.255.956.700  425.851.327.474
537.255.956.700 425.851.327.474
Jalan Tol/ Toll Road
WTR - Jakarta 69.632.170.864.997  57.262.108.475.134
69.632.170.864.997 57.262.108.475.134
Jumlah Sebelum Eliminasi/ Total Before Elimination 203.572.138.558.217  179.258.669.247.209 
Eliminasi/ Elimination (66.332.178.543.857) (54.867.087.623.573)
Jumlah Setelah Eliminasi/ Total After Elimination 137.239.960.014.360 124.391.581.623.636
 
 
30 September/ September 30,
2019 2018
Rp Rp
Pendapatan Usaha/Sales
Konstruksi/Constructions -- 
Divisi Infrastruktur I/ Division Infrastructure I  - Medan                 4.745.436.356.245 -- 
Divisi Infrastruktur II/ Division Infrastructure II  - Jakarta                 6.225.592.720.664 -- 
Divisi Infrastruktur III/ Division Infrastructure III  - Surabaya                 1.629.387.686.967 -- 
Divisi EPC/ Division EPC  - Jakarta                 1.619.712.555.709 -- 
Divisi Gedung/ Division Building - Jakarta                 1.699.911.574.037 -- 
Divisi I/ Division I  - Jakarta --  3.363.413.469.408 
Divisi III/ Division III  - Jakarta --  8.365.072.447.001 
Divisi V/ Division V  - Jakarta --  4.421.452.912.345 
Divisi IV/ Division IV  - Surabaya --  2.926.138.765.332 
Divisi II/ Division II  - Jakarta  --  1.842.278.011.928 
Divisi VI/ Division VI  - Palembang --  5.835.434.843.760 
Divisi VII/ Division VII  - Jakarta --  4.153.132.548.770 
Divisi VIII/ Division VIII  - Jakarta --  932.688.446.427 
15.920.040.893.622 31.839.611.444.971
Properti/ Property
WKR - Jakarta 223.765.942.913  143.348.284.193 
223.765.942.913 143.348.284.193
Sewa Gedung/ Building Rent 
Kantor Pusat - Jakarta 854.501.367  968.862.730 
854.501.367 968.862.730
Beton Precast/ Precast 
WBP - Jakarta 5.495.053.010.583  5.438.689.609.609 
5.495.053.010.583 5.438.689.609.609
Energi/ Energy
WKI (dh/ formerly  WKE) - Jakarta 37.815.265.259  49.604.832.229 
37.815.265.259 49.604.832.229
Jalan Tol/ Toll Road
WTR - Jakarta 11.225.735.453.910  11.893.416.647.356 
11.225.735.453.910 11.893.416.647.356
Jumlah Sebelum Eliminasi/ Total Before Elimination 32.903.265.067.654  49.365.639.681.088 
Eliminasi/ Elimination (10.888.368.655.550) (13.133.113.427.647)
Jumlah Setelah Eliminasi/ Total After Elimination 22.014.896.412.104 36.232.526.253.441
 

202
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
53. PERKARA HUKUM   53. LEGAL CASES 
 
1.  Komisi  Pengawas  Persaingan  Usaha  (KPPU)  1.  Commission  for  the  Supervision  of  Business 
menduga  adanya  persekongkolan  horizontal  dan  Competition (KPPU) suspects a horizontal and 
vertikal  pada  Proyek  Pembangunan  Gedung  vertical  conspiracy  in  Building  Project  of  Care 
Perawatan  dan  Pelayanan  Kelas  I  dan  VII  Rumah  and  Service  Class  I  and  VII  Building  of 
Sakit Sulawesi Tenggara antara panitia pengadaan  Southeast  Sulawesi  Hospital  between         
(terlapor  I),  Perusahaan  (terlapor  II)  dan  PT  Adhi  the  procurement  committee  (Defendant  I),  
Karya  (Persero)  Tbk  (ADHI)  (terlapor  III)  dalam  the  Company  (Defendant  II)  and  PT  Adhi 
register KPPU No.04/KPPU-L/2012.  Karya  (Persero)  Tbk  (ADHI)  (Defendant  III)  in 
register of KPPU No. 04 /KPPU-L/2012. 
   
Putusan  KPPU  pada  tanggal  25  April  2013,    The  verdict  of  KPPU  dated  April  25,  2013, 
menjatuhkan  hukuman  kepada  terlapor  II  untuk  passed  sentence  to  the  Defendant  II  to  pay  a 
membayar  denda  sebesar  Rp  3.168.820.000.   fine  amounted  to  Rp  3,168,820,000.  On   
Atas  putusan  tersebut  terlapor  II  mengajukan   the  verdict,  the  Defendant  II  has  filed  an 
upaya  hukum  pembatalan  putusan  KPPU  pada  annulment  of  KPPU  verdict  at  District  Court 
Pengadilan Negeri (PN) Jakarta Timur.  (PN) of East Jakarta. 
   
PN  Jakarta  Timur  mengeluarkan  putusan  District Court of East Jakarta issued  a verdict 
No. 01/Pdt.KPPU/2013/PN.Jkt.Tim  tanggal  21  Mei  No.  01/Pdt.KPPU/2013/PN.Jkt.Tim  dated 
2015 menyatakan batal demi hukum putusan KPPU  May 21,  2015  declared  void  and  null     
No. 04/KPPU-L/2012 tanggal 25 April 2012 dengan  the  verdict  of  KPPU  No.  04/KPPU-L/2012 
segala akibat hukumnya.  dated  April  25,  2012  with  all  the  legal 
consequences. 
   
KPPU  mengajukan  upaya  kasasi  pada  tanggal  KPPU files cassation efforts on September 15, 
15 September  2015  dimana  memori  kasasi  telah  2015  in  which  the  memory  of  cassation  has 
diajukan oleh KPPU tertanggal 28 September 2015,  been proposed by KPPU dated September 28, 
dan  kontra  memori  kasasi  diajukan  oleh  2015, and contra memory of cassation filed by 
Perusahaan  pada  3  Desember  2015.  Sampai  the  Company  on  December  3,  2015.  As  of    
dengan  tanggal  pelaporan  Perusahaan  masih  the reporting date the Company is still waiting 
menunggu hasil putusan kasasi.  for the appeal results. 
   
2.  Perkara Kepemilikan Lahan Pada Proyek Jalan Tol  2.  The  Case  of  Land  Ownership  of  Bekasi 
Bekasi Cawang Kampung Melayu.  Cawang Kampung Melayu Toll Road Project.  
   
Para  ahli  waris  Muhammad  Ba’at  mengajukan  The  heirs  of  Muhammad  Ba'at  filed  a  lawsuit 
gugatan  perbuatan  melawan  hukum  atas  on  land  ownership  due  to  the  construction  of 
kepemilikan  tanah  akibat  pembangunan  Proyek  Bekasi  Cawang  Kampung  Melayu  Toll  Road 
Jalan  Tol  Bekasi  Cawang  Kampung  Melayu  Project  (Becakayu)  at  District  Court  of  East 
(Becakayu)  di  PN  Jakarta  Timur  dengan  register  Jakarta  with  Register  No.  468/Pdt.G/2016/ 
No.  468/Pdt.G/2016/PN.Jkt.Tim  tanggal  PN.Jkt.Tim  dated  November  17,  2016,  in 
17 Nopember 2016, dimana para tergugat adalah:  which the defendants are: 
   
  Pemerintah  Republik  Indonesia  cq.    The  Government  of  the  Republic  of 
Kementerian  Pekerjaan  Umum  dan  Indonesia  cq.  Ministry  of  Public  Works 
Perumahan  Rakyat  (PUPERA)  cq.  Direktorat  and  Public  Housing  cq.  Directorate 
Jenderal  Bina  Marga  cq.  Direktorat  Jalan  General  of  Bina  Marga  cq.  Directorate 
Bebas  Hambatan  Perkotaan  &  Fasilitas  Jalan  General  of  Urban  Highways  and  Road 
cq. PPK Proyek Tol Becakayu (Tergugat I);  Facilities cq.  PPK  of  Becakayu  Toll  Road 
Project (Defendant I);  
  Pemprov DKI Jakarta cq. Pemkot Administrasi    Provincial  Government  of  Jakarta  cq. 
Jakarta  Timur  cq.  Panitia  Pengadaan  Tanah  Municipality  Administration  of  East 
untuk Kepentingan Umum (P2T) (Tergugat II);  Jakarta  cq.  the  Land  Procurement 
Committee  for  Public  Interest  (P2T) 
(Defendant II);  
  Pemerintah  Republik  Indonesia  cq.    The  Government  of  the  Republic  of 
Kementerian  PUPERA  cq.  Direktorat  Jenderal  Indonesia  cq.  Ministry  of  Public  Works 
Sumber  Daya  Air  cq.  Perum  Jasa  Tirta  II  and  Public  Housing  cq.  Directorate 
(Tergugat III);  General  of  Water  Resources  cq.  Perum 
Jasa Tirta II (Defendant III);  
 

203
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
  Pemerintah  Republik  Indonesia  cq.    The  Government  of  the  Republic  of 
Kementrian  Agraria  dan  Tata  Ruang/Badan  Indonesia  cq.  Ministry  of  Agrarian  Affairs 
Pertanahan  Nasional  (BPN)  cq.  Kepala  and  Spatial/National  Land  Agency  (BPN) 
Agraria/BPN Jakarta  Timur  (Turut  Tergugat  I);  cq. Head of Agrarian/BPN of East Jakarta 
dan  (Co- Defendant I); and 
  Perusahaan (Turut Tergugat II).    The Company (Co-Defendant II). 
   
Nilai  Gugatan  yang  diajukan  materil  sebesar   The  value  of  the  lawsuit  filed  by  the  material 
Rp 32.100.000.000.  amounted to Rp 32,100,000,000.  
   
Amar  Putusan  Pengadilan  Negeri  Jakarta  Timur,  The  verdict of  the  East  Jakarta  District  Court, 
tanggal  31  Oktober  2017  menyatakan  gugatan  dated  October  31,  2017  stated  that              
penggugat tidak dapat diterima.  the plaintiff's claim cannot be accepted. 
 
Atas  putusan  tersebut,  Penggugat  melakukan  Upon  the  verdict,  the  Plaintiff  appealed  on 
upaya  hukum  banding  yang  diajukan  oleh  November 10, 2017. Waskita has submitted a 
Penggugat pada 10 Nopember 2017. Waskita telah  counter  memory  appeal  on  December  12, 
menyampaikan  Kontra  Memori  Banding  pada  2017.  Up  to  the  reporting  date,  the  Company 
12   Desember  2017.  Sampai  dengan  tanggal  is still monitoring the decision of the appeal in 
pelaporan,  Perusahaan  masih  memonitor  putusan  the High Court. 
banding di Pengadilan Tinggi. 
 
3.  Perkara Ganti Rugi Lahan Pembangunan Jalan Tol  3.  The  Case  of  Indemnification  on  Highway 
Kayu Agung-Palembang-Betung  Development  Land  in  Kayu  Agung  – 
Palembang – Betung 
   
Rizal  Apendi  Bin  Laso  mengajukan  gugatan  Rizal Apendi Bin Laso filed a lawsuit based on         
perbuatan  melawan  hukum  atas  ganti  rugi  lahan  the compensation of land that does not match 
yang tidak sesuai di PN Kayu Agung dengan register  to  case  registration  number  No.  02/ 
No.  02/Pdt.G/2017/PN.Kag  tanggal  14  Maret  2017,  Pdt.G/2017/PN.Kag  in  the  Disctric  Court  of 
dimana para tergugat adalah:  Kayu  Agung  on  March  14,  2017,  where  the 
defendants are: 
  Bupati Ogan Komering Ilir (Tergugat I);    Regent of Ogan Komering Ilir (Defendant I); 
  PT Waskita Sriwijaya Tol (Tergugat II); dan    PT  Waskita  Sriwijaya  Tol  (Defendant  II); 
  and 
  Perusahaan (Tergugat III).    The Company (Defendant III). 
   
Nilai  Gugatan  yang  diajukan  sebesar   The  value  of  the  lawsuit  filed  amounted  to  
Rp 747.750.000.  Rp 747,750,000.  
   
Sidang pertama digelar pada tanggal 10 April 2017.  The  first  hearing  was  held  on  April  10,  2017. 
Sidang  ke-19  digelar  pada  tanggal  16  Nopember  The  19th  hearing  was  held  on  November  16, 
2017  dengan  agenda  sidang  penyerahan  2017  with  the  agenda  of  submitting  a 
kesimpulan dari para pihak.  conclusion from the plaintiff of each party.  
   
Sidang  ke-20  digelar  pada  tanggal  The  20th  hearing  was  held  on  December  6, 
6  Desember  2017  dengan  pembacaan  putusan.  2017  with  the  agenda  of  reading  the  verdict.   
Putusan  atas  perkara  tersebut  adalah  gugatan  The  next  action  taken  by  the  Company  is 
penggugat  diputus  NO  (Niet  Ontvankelijke  monitoring  the  next  hearing.  The  verdict  on 
Verklaard)  atau  tidak  dapat  diterima.  Pada  tanggal  the  case  is  the  Plaintiff's  Lawsuit  is  NO  (Niet 
28 Desember 2017 penggugat mengajukan banding  Ontvankelijke  Verklaard)  or  unacceptable.     
atas  putusan  tersebut.  Perusahaan  telah  On  December  28,  2017,  the  plaintiffs 
menyampaikan kontra memori banding pada tanggal  appealed  against  the  verdict.  The  Company 
6 Pebruari 2018.   has  submitted  a  counter  memory  appeal  on 
February 6, 2018.  
   
Putusan  banding  Pengadilan  Tinggi  Palembang  The  appeal  decision  of  the  Palembang  High 
tanggal 9 Mei 2018 memutuskan:  Court on May 9, 2018 decided to: 
  Menerima  permohonan  banding  dari      Accept  an  appeal  from  the  comparator, 
pembanding, semula penggugat tersebut  initially the plaintiff 
  Menguatkan  putusan  Pengadilan  Negeri  Kayu    Strengthening  the  decision  of  the  Kayu 
Agung yang dimohonkan banding tersebut  Agung District Court that was appealed for 
  Menghukum  pembanding/penggugat  membayar    Punish  the comparator/plaintiff  to  pay  court 

204
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
biaya perkara tingkat Pengadilan Negeri sebesar  fees  at  the  District  Court  level  of     
Rp  4.171.000  dan  tingkat  Pengadilan  Tinggi  Rp  4,171,000  and  the  High  Court  level  of 
sebesar Rp 150.000.  Rp 150,000. 
     
Perkara  ini  untuk  selanjutnya  telah  incracht  karena    Furthermore,  this case has  received final  and 
tidak  ada  upaya  hukum  lebih  lanjut  yang  dilakukan  binding  decision  from  the  court  (“incracht”) 
oleh Penggugat.  considering that there is no further legal effort 
by the Plaintiff. 
   
4.  Perkara  Proyek  Pembangunan  Gedung  SKPD  4.  The  Case  of  Development  of  the  SKPD 
Pemkot Pekanbaru   Pekanbaru Municipality Building 
   
Pemantau  Korupsi  dan  Penyelamat  Aset  Negara  Corruption  Monitoring  and  Country  Assets 
(PETAKORSIPARA)  mengajukan  gugatan  untuk  Rescue (PETAKORSIPARA) filed a     lawsuit 
menghentikan  pekerjaan  pembangunan  dan  to  discontinue  the  construction  work             
melakukan  rehabilitasi  lahan  menjadi  hutan  kembali  and  rehabilitate  the  land  into  a  forest  again  
di  PN  Pekanbaru  dengan  Perkara  in  Pekanbaru  Court  with  case  number  
No.  224/Pdt.G/2017/PN.Pbr,  di  mana  para  tergugat  No.  224/Pdt.G/2017/PN.Pbr,  where  
adalah:  the defendants are: 
  Walikota Pekanbaru (Tergugat I);    Mayor of Pekanbaru (Defendant I); 
  Perusahaan (Tergugat II);    The Company (Defendant II); 
  Menteri  Lingkungan  Hidup  dan  Kehutanan  RI    Ministry  of  Environment  and  Forestry  (Co-
(Turut Tergugat I);  Defendant I); 
  Menteri Dalam Negeri (Turut Tergugat II);    Ministry  of  Internal  Affairs  (Co-Defendant 
  II); 
  Gubernur Riau (Turut Tergugat III);    Governor Riau (Co-Defendant III); 
  Komisi  Pemberantasan  Korupsi  (Turut  Tergugat    Corruption  Eradication  Commission  (KPK) 
IV);  dan  (Co-Defendant IV); and 
  Kepala  Dinas  Kehutanan  Riau  (Turut  Tergugat    Head  of  Forest  Office  Riau  (Co-Defendant 
V).  V). 
   
Tergugat  dituntut  untuk  menghentikan  pekerjaan  The  Defendant  is  prosecuted  to  discontinue 
pembangunan  dan  melakukan  rehabilitasi  lahan  the construction work and rehabilitate the land 
menjadi  hutan  kembali  dan  menhukum  tergugat  I  into  a  forest  again  and  punish  defendant  I  to 
untuk  mengembalikan  uang  negara  sebesar  return the state fund of Rp 600,000,000,000. 
Rp 600.000.000.000. 
   
Sidang  pertama  digelar  pada  tanggal  7  Nopember  The  first  hearing  was  held  on  November  7, 
2017.  Sidang  selanjutnya  digelar  pada  tanggal  2017. The next hearing be held on January 4, 
4  Januari  2018  dengan  agenda  sidang  jawaban  2018  with  the  agenda  of  reading  the  verdict. 
gugatan  dari  tergugat.  Sidang  selanjutnya  digelar  The next hearing was held on March 29, 2018, 
pada  tanggal  29  Maret  2018  dengan  agenda  with  the  agenda  of  examining  the  witnesses.    
pemeriksaan  saksi.  Sidang  terakhir  digelar  pada  The  last  hearing  was  held  on  April  19,  2018 
tanggal  19  April  2018  dengan  penyerahan  with the conclusion of the parties. The verdict 
kesimpulan  dari  para  pihak.  Putusan  dibacakan  was read on May 14, 2018 with the content of 
pada  tanggal  14  Mei  2018  dengan  isi  putusan  the  verdict  that  the  plaintiff’s  claim  is 
adalah gugatan para penggugat tidak dapat diterima.  unacceptable.  On  this  decision  the  Plaintiff 
Atas  putusan  tersebut  Penggugat  mengajukan  filed an appeal and the Company submitted a 
banding  dan  Perusahaan  telah  menyampaikan  counter-appeal against it on August 14, 2018. 
kontra  memori  banding  pada  14  Agustus  2018.  The appeal decision on December 19, 2018 at  
Putusan  Banding  pada  tanggal  19  Desember  2018  Pekanbaru  High  Court,  which  in  its  decision 
pada Pengadilan Tinggi Pekanbaru yang pada amar  that the decision of the Pekanbaru High Court 
Putusannya  bahwa  Putusan  Pengadilan  Tinggi  upheld  the  decision  of  the  Pekanbaru  District 
Pekanbaru  menguatkan  Putusan  Pengadilan  Negeri  Court  appealed  by  the  comparator.  This  case 
Pekanbaru  yang  dimohonkan  Banding  oleh  has  received  final  and  binding  decision  from 
Pembanding.  Perkara  ini  untuk  selanjutnya  telah  the  court  (“incracht”),  in  consideration  of  no 
incracht  karena  tidak  ada  upaya  hukum  lebih  lanjut  further legal effort by the Plaintiff 
yang dilakukan oleh Penggugat. 
   
 
 
 
 

205
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
5.  Gugatan  Wanprestasi    Pembangunan  Jalan  Tol  5.  Lawsuit  Wanprestasi  Construction  of 
Ruas Bakauheni – Terbanggi Besar  Bakauheni - Terbanggi Besar Toll Road 
   
PT Indokom Samudra Persada (Penggugat I) dan Hi  PT Indokom Samudra Persada (Plaintiff I) and 
Saimi Saleh (Penggugat II) mengajukan gugatan ke  Hi  Saimi  Saleh  (Plaintiff  II)  filed  a  lawsuit  to   
Pengadilan  Negeri  (PN)  Kalianda  dengan  perkaran  the  District  Court  (PN)  of  Kalianda  with   
nomor 14/Pdt.G/2018/PN/Kla, dimana para tergugat  the  petition  number  14/Pdt.G/2018/PN/Kla, 
adalah :  where the defendants were: 
  Ditjen  Bina  Marga  Cq.  Kepala  Satker    Directorate General of Highways Cq. Head 
Pengadaan  Tanah  Jalan  Tol  Wilayah  II  P2T  of  Satker  Procurement  of  Toll  Road  Land 
Jalan  Tol  Bakauheni  –  Terbanggi  Besar  Area  II  P2T  Bakauheni  -  Terbanggi  Besar 
(Tergugat I)  Toll Road (Defendant I) 
  PT Hutama Karya (Persero) (Tergugat II)    PT Hutama Karya (Persero) (Defendant II) 
  Perusahaan (Tergugat III)    The Company (Defendant III) 
  Gubernur Lampung (Tergugat IV)    Governor of Lampung (Defendant IV) 
   
Gugatan  yang  diajukan  adalah  untuk  menghukum  The  proposed  lawsuit  is  to  punish     
para  tergugat  untuk  membangun  atau  membuat  the defendants to establish a special liaison or 
jalan  penghubung  atau  “Frontage”  khusus  untuk  "Frontage"  for  the  Plaintiffs'  use  or  to  pay 
digunakan  Para  Penggugat  atau  membayar  ganti  compensation worth Rp 13,500,000,000. 
rugi senilai Rp 13.500.000.000.    
   
Sidang  Putusan  tanggal  15  Oktober  2018  Decision on October 15, 2018 decided to: 
memutuskan: 
1.  Menolak  Gugatan  para  Penggugat  untuk  1.  Refuse the Plaintiff's Lawsuit in its entirety 
seluruhnya   
2.  Menghukum  para  Penggugat  membayar  biaya  2.  Sentencing  the  Plaintiffs  to  pay  court  fees 
perkara sebesar Rp 5.677.000.  of Rp 5,677,000. 
   
Perkara  ini  untuk  selanjutnya  telah  incracht  karena  Hence,  this  case  has  received  final  and 
tidak  ada  upaya  hukum  lebih  lanjut  yang  dilakukan  binding  decision  from  the  court 
oleh Penggugat.  (“incracht”),considering  that  there  is  no  further 
legal effort by the Plaintiff. 
   
6.  Perkara  Dugaan  Pelanggaran  Terkait  Empat  (4)  6.  Alleged  Related  Infringement  Case  Four  (4) 
Paket  Tender  Pembangunan  Jalan  di  Provinsi  Tender  Packages  for  Road  Construction  in 
Banten  Banten Provinc 
   
Dugaan  persekongkolan  oleh  KPPU  dalam  Alleged  conspiracy  by  KPPU  for  the  tender  of  
melakukan  tender  4  paket  Proyek  Pembangunan  4  package  of  Road  Construction  Project  in 
Jalan  di  Banten  dengan  sumber  dana  APBD  2015  Banten  with  source  of  APBD  2015  fund  with 
dengan  perkara  nomor  07/KPPU-I/2017  dimana  case  number  07/KPPU-I/2017  where  
para terlapor adalah:  the reported party is: 
  Panitia Pengadaan (Terlapor I)    Procurement Committee (Reported Party I) 
  PT Adhi Karya (Persero) Tbk (Terlapor II)    PT Adhi Karya (Persero) Tbk (Reported II) 
  PT Hutama Karya (Persero) (Terlapor III)    PT Hutama Karya (Persero) (Reported III) 
  PT Brantas Abipraya (Persero) (Terlapor IV)    PT  Brantas  Abipraya  (Persero)  (Reported 
  IV) 
  Perusahaan (Terlapor V)    The Company (Reported V) 
   
Perusahaan  telah  menyerahkan  tanggapan/  The  Company  has  submitted  its 
bantahannya  atas  laporan  dugaan  pelanggaran  tim  response/Resutation  to  the  alleged  report  of 
Investigator.  Perusahaan  juga  telah  menyampaikan  the  violation  of  the  Investigator  team.  
daftar  saksi  fakta  dan  saksi  ahli  kepada  Majelis  The Company has also submitted a list of fact 
Komisi Pemeriksaaan Pendahuluan pada KPPU.   witnesses  and  expert  witnesses  to  
the  Commission's  for  Investigation  of 
Introduction to KPPU.  
   
Pada  tanggal  17  Desember  2018  dilakukan  sidang  On  December  17,  2018  a  trial  was  held  on  
dengan agenda pembacaan putusan. Amar Putusan  the  decision  to  read  the  verdict.  The  Amar 
KPPU  adalah  menyatakan  bahwa  Terlapor  I,  II,  III,  Commission's  Decision  is  to  state  that  
IV  dan  V  tidak  terbukti  melanggar  Pasal  22  UU  the Reported Party I, II, III, IV and V were not 
Nomor  5  tahun  1999  Tentang  Larangan  Praktek  proven  to  violate  Article  22  of  Law  Number  5 

206
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Monopoli  dan  Persaingan  Usaha  Tidak  Sehat.  of 1999 concerning Prohibition of Monopolistic 
Perkara  ini  untuk  selanjutnya  telah  incracht  karena  Practices  and  Unfair  Business  Competition. 
tidak  ada  upaya  hukum  lebih  lanjut  yang  dilakukan  This  case  has  subsequently  been  incracht 
oleh KPPU.  because  there  were  no  further  legal  efforts 
made by KPPU. 
   
7.  Perkara  Gugatan  Melawan  Hukum  Kerjasama  7.  The case of Lawsuit Against Joint Cooperation 
Penyelenggaraan Jalan Tol Semarang – Batang  in the management of Semarang – Batang Toll 
Road 
   
PT  Marga  Setiapuritama  mengajukan  gugatan  ke  PT  Marga  Setiapuritama  filed  a  lawsuit  to    
Pengadilan  Negeri  (PN)  Jakarta  Selatan  dengan  the South Jakarta District Court with the case 
Perkara  nomor  159/Pdt.G/2018/PN.Jkt.Sel  dengan  number  159/Pdt.G/2018/PN.Jkt.Sel  with        
para tergugat adalah :  the defendants are: 
  Badan  Pengatur  Jalan  Tol  qq.  Kementerian    Toll  Road  Regulatory  Agency  qq.  Ministry 
Pekerjaan  Umum  dan  Perumahan  Rakyat  of  Public  Works  and  Public's  Housing  of          
Republik Indonesia (Tergugat I)  the Republic of Indonesia (Defendant I) 
  PT  Jasamarga  Semarang  Batang  (Turut    PT  Jasamarga  Semarang  Batang  (Co-
Tergugat I)  Defendant I) 
  PT Jasamarga (Persero) Tbk (Turut Tergugat II)    PT  Jasamarga  (Persero)  Tbk  (Co-
  Defendant II) 
  PT Waskita Toll Road (Turut Tergugat III)    PT Waskita Toll Road (Co-Defendant III) 
  Perusahaan (Turut Tergugat IV)    The Company (Co-Defendant IV) 
  Kementerian BUMN (Turut Tergugat V)    Ministry of BUMN (Co-Defendant V) 
   
Gugatan  yang  diajukan  adalah  menyatakan            The  lawsuit  filed  is  stating  the  legal 
sah  sita  jaminan  (onservatoir  beslag)  atas               confiscation guarantee (onservatoir beslag) of 
aset-aset  berharga  dengan  nilai  gugatan     valuable  assets  with  a  claim  value  of    
Rp 47.643.396.932.963.  Rp  47,643,396,932,963. 
   
Sidang  pada  tanggal  3  April  2018  dengan  agenda  The hearing on April 3, 2018 with the agenda 
pengenalan para pihak. Sidang tanggal 31 Mei 2018  of introducing the parties. The hearing on May 
dengan  agenda  penyampaian  jawaban  gugatan  31,  2018  with  the  agenda  to  deliver  
Para  Tergugat  dan  Turut  Tergugat.  Sidang  the  Defendant's  and  the  Co-Defendants' 
selanjutnya  digelar  pada  tanggal  26  Juli  2018  lawsuit's response. The next hearing was held 
dengan  agenda  pemeriksaan  alat  bukti.  Sidang  on July 26, 2018 with the examination agenda 
terakhir  tanggal  30  Agustus  2018  dengan  agenda  of  evidence.  The  last  hearing  was  on  
putusan sela yang amar putusannya adalah :  30 August 2018 with an interiocutory decision, 
  the decision is: 
   
Dalam  Eksepsi  :  mengabulkan  eksepsi  yang  In Exception: grant the exception submitted by 
diajukan  oleh  Tergugat  dan  para  Turut  Tergugat   the Defendant and Co-Defendant for partially. 
untuk sebagian.   
   
Dalam Pokok Perkara :  In the Subject Matter: 
  Menyatakan bahwan PN Jakarta  Selatan secara    Stating that the South Jakarta District Court 
absolut tidak berwenang untuk mengadili perkara  is  absolutely  not  authorized  to  hear  the  a 
a quo  quo case 
  Menyatakan  gugatan  Penggugat  tidak  dapat    Stating  that  the  Plaintiff's  claim  cannot  be 
diterima  accepted 
  Menghukum  Penggugat  untuk  membayar    Punish the Plaintiff to pay all costs incurred 
seluruh biaya yang timbul akibat perkara ini  due to this case 
   
Perkara  ini  untuk  selanjutnya  telah  incracht  karena  Hence,  this  case  has  received  final  and 
tidak  ada  upaya  hukum  lebih  lanjut  yang  dilakukan  binding  decision  from  the  court 
oleh Penggugat.  (“incracht”),considering that there is no further 
legal effort by the Plaintiff. 
   
 
 
 
 
 

207
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
8.  Perkara  Gugatan  Melawan  Hukum  Permasalahan  8.  Lawsuit  Against  the  Law  on  Land  of  Bocimi 
Lahan Jalan Tol Bocimi  Toll Road Issues 
   
Sahala  H.S.  Marpaung  mengajukan  gugatan  ke  Sahala  H.S.  Marpaung  filed  a  lawsuit  to     
Pengadilan Negeri Cibinong dengan Perkara nomor  the  Cibinong  District  Court  with  Case  number 
51/Pdt.G/2018/PN.Cbi dengan para tergugat:  51/Pdt.G/2018/PN.Cbi with the defendants: 
  Bupati Kabupaten Bogor (Tergugat I)    Regent of Bogor District (Defendant I) 
  Sekda Kabupaten Bogor (Tergugat II)    District Secretary of Bogor (Defendant II) 
  Pelaksana Operasional Bocimi (Tergugat III)    Bocimi  Operational  Executor  (Defendant 
  III) 
  PT MNC Tol Investama (Tergugat IV)    PT MNC Tol Investama (Defendant IV) 
  Satia M. Marpaung (Tergugat V)    Satia M. Marpaung (Defendant V) 
  Camat Caringin (Tergugat VI)    Camat Caringin (Defendant VI) 
  Kepala Desa Cimande Hilir (Tergugat VII)    Head  of  Cimande  Hilir  Village  (Defendant 
  VII) 
  Perusahaan (Turut Tergugat I)    The Company (Co-Defendant I) 
  Pemerintah Jawa Barat (Turut Tergugat II)    West Java Government (Co-Defendant II) 
  BPN Cibinong (Turut Tergugat III)    BPN Cibinong (Co-Defendant III) 
     
Nilai  Gugatan  yang  diajukan  sebesar   The  value  of  lawsuit  filed  amounted  to  
Rp 7.850.000.000.  Rp 7,850,000,000.  
     
Sidang  pada  tanggal  22  Nopember  2018  dengan    Hearing  on  November  22,  2018  with                  
Agenda sidang pembacaan putusan PN yang isinya:  the  agenda  of  the  PN  verdict  reading  
the following content: 
     
  Menerima  dan  mengabulkan  sebagian  gugatan      Accept  and  grant  part  of  the  Plaintiff's 
Penggugat  claim 
  Menyatakan  bahwa  Tergugat  I  –  VII  terbukti      Stating  that  Defendants  I  -  VII  were  found 
bersalah melakukan Perbuatan melawan hukum  guilty of committing acts against the law 
  Menyatakan bahwa Penggugat adalah ahli waris      Declare that the Plaintiff is the legal heir of 
yang sah dari Alm Drs PHS Marpaung  Drs. PHS Marpaung 
  Menyatakan  bahwa  Penggugat  adalah  pemilik      Declare that the Plaintiff is the legal owner 
yang sah atas sebidang tanah seluas 71.453 M2  of  a  plot  of  land  covering  71,453  sqm 
yang  merupakan  harta  warisan  A.  Drs  PHS  which  is  inherited  property  of  A.  Drs  PHS 
Marpaung  Marpaung 
  Menyatakan  bahwa  tanah  seluas  20.000  M2      Declare  that  the  land  area  of  20,000  sqm 
yang  terkena  pembangunan  tol  merupakan  affected by toll road construction is part of 
bagian dari tanah seluas 71.453 M2  the land area of 71,453 sqm 
  Menghukum  Tergugat  I  –  VII  untuk  membayar      Penalize  Defendants  I  -  VII  to  pay                  
kepada  Penggugat  secara  tanggung  renteng  the Plaintiff jointly in the amount of 3.5 M 
sebesar 3,5 M 
  Menghukum  Tergugat  I  –  VII  secara  tanggung      Punish  Defendant  I  -  VII  jointly  pay     
renteng membayar biaya perkara  the court fees 
  Menghukum  Turut  Tergugat  I  –  III  untuk  tunduk      Punishing  the  Defendant  I  -  III  to  submit 
dan patuh atas putusan  and obey the decision 
  Menolak  gugatan  Penggugat  untuk  selain  dan      Refuse  the  claim  of  the  Plaintiff  for  other 
selebihnya  than the rest
 
Tergugat  III  Pelaksana  Operasional  Bocimi  (PPK)    Defendant  III  Operational  Executor  Bocimi 
telah mengajukan banding atas Putusan PN ini:  (PPK) has appealed on this PN Decision: 
     
  Memori banding dari Tergugat I, II, III, V, VI, VII      Appeal memories from Defendants I, II, III, 
telah  diserahkan  di  Pengadilan  Negeri  Cibinong  V,  VI,  VII  have  been  submitted  to  the 
tanggal 2 Januari 2019.  Cibinong District Court on January 2, 2019.
  Relaas  Penyerahan  memori  Banding  diterima      Relaas  Submission  of  Memory  of  Appeals 
Kuasa Perusahaan tanggal 22 Januari 2019. is  received  by  the  Company's  Proxy  on 
January 22, 2019.
  Kontra  Memori Banding sudah didaftarkan pada      Counter Memory Appeal was registered on 
hari Senin tanggal 25 Pebruari 2019. Monday on February 25, 2019.
 

208
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada  tanggal  24  Juli  2019  Pengadilan  Tinggi    On  July  24,  2019  the  West  Java  High  Court 
Jawa  Barat  mengeluarkan  Putusan  issued Decision No. 197/PDT/2019/PT.Bdg on 
No.  197/PDT/2019/PT.Bdg  tanggal  26  Juni  2019  June 26, 2019 the ruling reads: 
yang amarnya berbunyi: 
  Menerima  Permohonan  Banding  dari      Receive  Appeals  from  Appellant  I  which 
Pembanding  I  semula  Tergugat  III  dan  was  originally  Defendant  III  and  Appellant 
Pembanding II semula Tergugat I, II, VI, VII serta  II  which  were  originally  Defendant  I, II,  VI, 
Terbanding III semula Tergugat V  VII  and  Compared  III  originally  Defendant 

  Membatalkan  Putusan  Pengadilan  Negeri      Canceling  the  Decision  of  the  Cibinong 
Cibinong  tanggal  22  Nopember  2018  District  Court  dated  November  22,  2018 
No. 51/Pdt.G/2018/PN.Cbi.  No. 51/Pdt.G/2018/PN.Cbi. 
     
Mengadili sendiri:    Judge for yourself: 
  Menyatakan  Gugatan  Penggugat  tidak  dapat      Declares  the  Plaintiff's  Lawsuit  is  not 
diterima (Niet Onvanklijk Veerklaard).  acceptable (Niet Onvanklijk Veerklaard). 
     
Penggugat  pada  tanggal  29  Juli  2019  telah    The plaintiff on July 29, 2019 had submitted a 
menyampaikan  memori  kasasi.  Pada  tanggal  22  cassation  memory.  On  August  22,  2019  
Agustus  2019  Perusahaan  telah  menerima  relaas  the Company received an appeal in cassation. 
kasasi.  Pada  tanggal  5  September  2019  On  September  5,  2019  the  Company 
Perusahaan  telah  menyampaikan  kontra  memori  submitted a counter memory of cassation. 
kasasi. 
 
Sampai  dengan  tanggal  pelaporan,  Perusahaan    As  of  the  reporting  date,  the  company  still 
masih  memonitor  Putusan  Kasasi  di  tingkat  monitors  the  Cassation  Decision  at  
Mahkamah Agung. the Supreme Court level.
   
9.  Perkara  Gugatan  Melawan  Hukum  Permasalahan  9.  Lawsuit  Against  the  Law  on  Land  Issuer  of 
Lahan Jalan Tol CCT Seksi 1  CCT Section 1 Toll Road 
   
Nelis  mengajukan  gugatan  ke  Pengadilan  Negeri  Nelis filed a lawsuit to the Bekasi District Court 
Bekasi  dengan  Perkara  nomor  with  Case  number  223/Pdt.G/2018/PN.Bks 
223/Pdt.G/2018/PN.Bks dengan tergugat:  with the defendant: 
   
  Sutisewan Kosasih (Tergugat I)    Sutisewan Kosasih (Defendant I) 
  Perusahaan (Tergugat II)    Company (Defendant II) 
  Kepala  Dinas  Pekerjaan  Umum  dan    Head  of  Public Works  and  Public  Housing 
Perumahan Rakyat Kota Bekasi (Tergugat III)  Office Bekasi City (Defendant III) 
  Kepala Dinas Pertanian Kota Bekasi (Tergugat    Head  of  Agriculture  Office  Bekasi  City 
IV)  (Defendant IV) 
  Kepala  Dinas  Pekerjaan  Umum  Kota  Bekasi    Head  of  Public  Works  Office  Bekasi  City 
(Tergugat V)  (Defendant V) 
  Kepala Kelurahan Jatikarya (Turut Tergugat I)    Head of Jatikarya Village (Co-Defendant I) 
  Kepala  Kecamatan  Jatisampurna  (Turut    Head  of  Jatisampurna  District  (Co-
Tergugat II)  Defendant II) 
  Kementerian  Pekerjaan  Umum  dan    Ministry  of  Public  Works  and  Public 
Perumahan Rakyat (Turut Tergugat III)  Housing (Co-Defendant III) 
   
Nilai  Gugatan  yang  diajukan  sebesar   The  value  of  lawsuit  filed  as  of  
Rp 360.000.000.  Rp 360,000,000.  
 
Pada  Tanggal  18  Desember  2018  Majelis  Hakim    On  December  18,  2018  the  panel  of  judges 
menetapkan dan memutuskan bahwa perkara a quo  has  establish  and  decide  that  the  a  quo  case 
telah  selesai  dengan  adanya  kesepakatan  was  concluded,  with  the  establishment  of 
perdamaian  dan  pencabutan  gugatan  oleh  peace  agreement  and  the  Plaintiff  revoked  
Penggugat.  Kuasa  Perusahaan  menerima  salinan  the  lawsuit.  The  company  power  of  attorney 
putusan tersebut pada Januari 2019.  received  the  copy  of  decision  on  January 
2019. 
     
Perkara  ini  untuk  selanjutnya  telah  incracht  karena    Hence,  this  case  has  received  final  and 
telah  ada  Putusan  mengenai  Kesepakatan  binding  decision  from  the  court 
Perdamaian dan Pencabutan Gugatan.  (“incracht”),considering that there is no further 
legal effort by the Plaintiff. 

209
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
10.  Perkara  Gugatan  Melawan  Hukum  Permasalahan  10.  Lawsuit  Against  the  Law  on  Land  Issues  of 
Lahan Jalan Tol CCT Seksi 1  CCT Section 1 Toll Road 
   
Ahli Waris Sanip bin Neban mengajukan gugatan ke  The  Heir  Sanip  bin  Neban  filed  a  lawsuit  to  
Pengadilan  Negeri  Bekasi  dengan  Perkara  the  Bekasi  District  Court  with  Case  
No. 347/Pdt.G/2018/PN.Bks dengan tergugat:  No.  347/Pdt.G/2018/PN.Bks  with  
  the defendant: 
  Perusahaan (Tergugat I)    The Company (Defendant I) 
  Kepala  Dinas  Pekerjaan  Umum  Kota  Bekasi    Head  of  Public  Works  Office  Bekasi  City 
(Tergugat II)  (Defendant II) 
  Kepala  Dinas  Pekerjaan  Umum  dan    Head  of  Public Works  and  Public  Housing 
Perumahan Rakyat Kota Bekasi (Tergugat III)  Office Bekasi City (Defendant III) 
  Kepala Dinas Pertanian Kota Bekasi (Tergugat    Head  of  Agriculture  Office  Bekasi  City 
IV)  (Defendant IV) 
  Kepala  Dinas  Pekerjaan  Umum  Kota  Bekasi    Head  of  Public  Works  Office  Bekasi  City 
(Tergugat V)  (Defendant V) 
  Kepala Kelurahan Jatikarya (Turut Tergugat I)    Head of Jatikarya Village (Co-Defendant I) 
  Kepala  Kecamatan  Jatisampurna  (Turut    Head  of  Jatisampurna  District  (Co-
Tergugat II)  Defendant II) 
  Kementerian  Pekerjaan  Umum  dan    Ministry  of  Public  Works  and  Public 
Perumahan Rakyat (Turut Tergugat III)  Housing (Co-defendant III) 
     
Gugatan  yang  diajukan  adalah  menyatakan  Sita    The  lawsuit  filed  was  stated  the  security  of 
Jaminan  tanah  621  M2  pecahan  girik  C  No.  1093,  seizing the land of 621 sqm fraction of Girik C  
membongkar pagar seng dan menghukum Tergugat  No.  1093,  dismantling  the  zinc  fence  and 
I  -  IV  dengan  nilai  gugatan  sebesar       punishing  Defendant  I  -  IV  with  a  claim 
Rp 4.826.000.000.  amounted to Rp 4,826,000,000. 
     
Pada Tanggal 15 Maret 2019 digelar sidang dengan  On  March  15,  2019  a  hearing  was  held  with 
agenda Pemeriksaan saksi setempat. Pada tanggal  the  agenda  of  inspection  local  witnesses.  On 
21  Maret  2019  digelar  sidang  dengan  agenda  March  21,  2019  a  hearing  was  held  with  
Pembacaan Kesimpulan.  the agenda for reading the conclusions. 
   
Sampai  dengan  tanggal  pelaporan,  Perusahaan  Up  to  the  date  of  reporting,  the  Company  is 
masih memonitor pelaksanaan Sidang selanjutnya.  still  monitoring the implementation of  the next 
hearing. 
   
11.  Perkara  Gugatan  Melawan  Hukum  Permasalahan  11.  Lawsuits  Against  the  Law  of  
Subkontraktor  Proyek  Jalan  Tol  Medan  –  Tebing  the  Subcontractor  of  Medan  –  Tebing  Tinggi 
Tinggi  Toll Road Issues 
   
CV  Tunas  Asli  Mulia  mengajukan  gugatan  ke  CV  Tunas  Asli  Mulia  filed  a  lawsuit  
Pengadilan  Negeri  Medan  dengan  Perkara  to  the  Medan  District  Court  with  
No.  707/Pdt.G/2018/PN.Mdn dengan tergugat:  Case  No.  707/Pdt.G/2018/PN.Mdn  with  
  the defendant: 
  PT Akbar Jaya Lestari (Tergugat I)    PT Akbar Jaya Lestari (Defendant I) 
  Perusahaan (Tergugat II)    The Company (Defendant II) 
  Drs. Zulkarnaen (Tergugat III)    Drs. Zulkarnaen (Defendant III) 
   
Nilai  Gugatan  yang  diajukan  sebesar   The  value  of  lawsuit  filed  amounted  to  
Rp 9.297.500.000 dan moril Rp 1.000.000.000.  Rp  9,297,500,000  and  moril            
Rp 1,000,000,000.  
   
Pada  tanggal  26  Nopember  2018  digelar  On  November  26,  2018  a  hearing  was  held 
sidang  dengan  agenda  pembacaan  gugatan.  with  the  agenda  of  reading  the  lawsuit.  On 
Pada  tanggal  14  Januari  2019  digelar  sidang  January  14,  2019  a  hearing  was  held  with  
dengan  agenda  permohonan  perbaikan  gugatan.  the  agenda  of  requesting  an  amendment.  On 
Pada  tanggal  13  Pebruari  2019  digelar  sidang  February  13,  2019  a  hearing  was  held  with  
dengan  agenda  pemeriksaan  I.  Pada  tanggal  the  agenda  of  examination  I.  On  March  13, 
13  Maret  2019  digelar  sidang  dengan  agenda  2019  a  hearing  was  held  with  the  agenda  
pemeriksaan  II.  Pada  tanggal  17  Juni  2019  examination  II.  On  June  17,  2019  a  hearing 
diadakan  sidang  dengan  agenda  penyerahan  was  held  with  the  Defendant  I  Answer 
Jawaban  Tergugat  I.  Pada  tanggal  24  Juni  2019  Agenda. On June 24, 2019 a hearing was held 

210
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
diadakan  sidang  dengan  agenda  penyerahan  with  the  Answer  submission  agenda.  On  July 
Jawaban.  Pada  tanggal  1  Juli  2019  digelar  sidang  1, 2019 a hearing was held with the agenda of 
dengan  agenda  Penyerahan  Jawaban  dari  Submitting  Answers  from  the  Defendant.  On 
Tergugat.  Pada  tanggal  8  Juli  2019  digelar  sidang  July  8,  2019  a  hearing  was  held  with  
dengan  agenda  Penyerahan  Jawaban  dari  the  agenda  of  Submitting  Answers  from  
Tergugat. Pada tanggal 15 Juli 2019 digelar sidang  the  Defendant.  On  July  15,  2019  a  hearing 
dengan agenda Penyerahan Bukti Tertulis oleh Para  was  held  with  the  agenda  of  Submitting 
Pihak.  Pada  tanggal  22  Juli  2019  digelar  sidang  Written  Evidence  by  the  Parties.  On  July  22, 
dengan  agenda  Replik  dari  Penggugat.  Pada  2019  a  hearing  was  held  with  the  Replic's 
tanggal  19  Agustus  2019  digelar  sidang  dengan  agenda of  the Plaintiff.  On August 19,  2019 a 
Agenda  Replik  dari  Penggugat.  Sampai  dengan  hearing  was  held  with  the  Plaintiff  Replic 
tanggal  pelaporan,  Perusahaan  masih  memonitor  Agenda.  Up  to  the  reporting  date,  
pelaksanaan sidang selanjutnya.  the  Company  is  still  monitoring  
the implementation of the next hearing. 
   
12.  Perkara  Gugatan  Melawan  Hukum  Proyek  Tol  12.  Lawsuits Against the Law of the Becakayu Toll 
Becakayu  Road Project 
   
Roswinawaty  Sitompul  mengajukan  gugatan  ke  Roswinawaty  Sitompul  filed  a  lawsuit  with  
Pengadilan  Negeri  Jakarta  Timur  dengan  Perkara  the  East  Jakarta  District  Court  with  
No.  502/Pdt.G/2018/PN.Jkt.Tim dengan tergugat:  Case  No.  502/Pdt.G/2018/PN.Jkt.Tim  with  
  the defendant: 
  Ahli Waris Alm H Asmawih (Tergugat I)    The Heir of Alm H Asmawih (Defendant I) 
  Kementrian PUPR (Tergugat II)    Ministry of PUPR (Defendant II) 
  Pemerintah  Provinsi  DKI  Jakarta  Cq  Panitia    DKI  Jakarta  Provincial  Government  Cq 
Pengadaan  Tanah  untuk  Kepentingan  Umum  Land  Procurement  Committee  for  Public 
(Tergugat III)  Interest (Defendant III) 
  Perusahaan Umum Jasa Tirta II (Tergugat IV)    Jasa  Tirta  II  Public  Company  (Defendant 
  IV) 
  Badan Pertanahan Nasional RI (Tergugat V)    Indonesian  National  Land  Agency 
  (Defendant V) 
  Pemprov  Jakarta  Cq  Kecamatan  Makasar    Jakarta  Provincial  Government  Cq 
(Tergugat VI)  Makasar District (Defendant VI) 
  Pemprov  Jakarta  Cq  Kelurahan  Cipinang    Jakarta  Provincial  Government  Cq 
(Tergugat VII)  Cipinang Village (Defendant VII) 
  Perusahaan (Tergugat VIII)    The Company (Defendant VIII) 
   
Nilai  Gugatan  yang  diajukan  sebesar   The  value  of  lawsuit  filed  amounted  to  
Rp 6.428.796.000.  Rp 6,428,796,000. 
   
Pada  tanggal  6  Desember  2018  digelar  sidang  On December 6, 2018 a hearing was held with 
dengan  agenda  perbaikan  gugatan  dari  penggugat.   the  plaintiff's  agenda  to  improve  the  lawsuit. 
Pada  tanggal  31  Januari  2019  digelar  sidang  On January 31, 2019 a hearing was held with 
dengan agenda  pembacaan  gugatan.  Pada  tanggal  the  agenda  of  reading  the  lawsuit.  
14  Pebruari  2019  dilaksanakan  sidang  dengan  On  February  14,  2019  a  trial  was  held  with  
agenda mediasi kedua. Pada tanggal 6 Maret 2019  the  second  mediation  agenda.  On  March  6, 
dilaksanakan sidang dengan agenda mediasi ketiga.  2019  a  trial  was  held  with  the  third  mediation 
Pada tanggal 20 Juni 2019 diadakan sidang dengan  agenda. On June 20, 2019 a hearing was held 
agenda  Replik  Penggugat  namun  tidak  dapat  with the Plaintiff's Replic agenda but could not 
dilaksanakan  karena  Ketua  Majelis  Hakim  tidak  be  held  because  the  Chief  Judge  could  not 
dapat  hadir.  Pada  tanggal  4  Juli  2019  diadakan  attend.  On  July  4,  2019  a  hearing  was  held 
sidang dengan agenda Replik dari Penggugat. Pada  with  the  Replic's  agenda  of  the  Plaintiff.  On 
tanggal  11  Juli  2019  diadakan  sidang  dengan  July  11,  2019  a  hearing  was  held  with  
agenda  Duplik  dari  Tergugat.  Pada  tanggal  the  agenda  of  Duplic  of  the  Defendant.  On 
26  September  2019  diadakan  sidang  dengan  September  26,  2019  a  hearing  was  held  with 
agenda  Pembacaan  Putusan  namun  ditunda  dan  the  agenda  of  Decision  Reading  but  was 
akan  dilanjutkan  pada  tanggal  10  Oktober  2019.  postponed  and  will  be  continued  on  October 
Sampai  dengan  tanggal  pelaporan,  Perusahaan  10,  2019.  Up  to  the  date  of  reporting,  
masih  memonitor  putusan  pada  tingkat  Pengadilan  the  company  still  monitors  decisions  at  
Negari.  the District Court level. 
   
 
 

211
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
13.  Perkara  Gugatan  Perbuatan  Melawan  Hukum  Ahli  13.  Case  of  Lawsuit  Against  Law  of  the  Heir 
Waris Joshua Dolok Bona Tampubolon  Joshua Dolok Bona Tampubolon 
   
Joshua  Dolok  Bona  Tampubolon  mengajukan  Joshua  Dolok  Bona  Tampubolon  filed  a 
gugatan  ke  Pengadilan  Negeri  Jakarta  Timur  lawsuit  with  the  East  Jakarta  District  Court 
dengan  Perkara  No.    511/Pdt.G/2018/PN.Jkt.Tim  with  Case  No.  511/Pdt.G/2018/PN.Jkt.Tim 
dengan  tergugat  Perusahaan.  Nilai  Gugatan  yang  with  the  Company  defendants.  The  value  of 
diajukan sebesar Rp 781.546.735.  lawsuit filed as of Rp 781,546,735. 
   
Pada  tanggal  7  Pebruari  2019  telah  dilakukan  On  February  7,  2019,  the  agenda  of  
agenda sidang mediasi V dengan hasil tidak adanya  the  mediation  session  V  was  held  with  
kesepakatan  selama  Mediasi,  maka  perkara  akan  no result due to the absence of an agreement 
dimulai  persidangan  pokok  perkara.  Pada  tanggal  during  Mediation,  the  case  will  proceed  with 
28  Pebruari  2019  digelar  sidang  pertama  dengan  the  main  trial  case.  On  February  28,  2019  
agenda  pembacaan  replik.  Pada  tanggal  14  Maret  the  first  session  was  held  with  the  agenda  of 
2019  digelar  sidang  dengan  agenda  pembacaan  reading  the  reply.  On  March  14,  2019  a 
duplik.  Pada  tanggal  21  Maret  2019  digelar  sidang  hearing  was  held  with  a  reading  of  the 
dengan  agenda putusan  sela namun  ditunda.  Pada  rejoinder  agenda.  On  March  21,  2019  a 
tanggal  28  Maret  2019  digelar  sidang  dengan  hearing  was  held  with  the  agenda  of  reading 
agenda  pembacaan  putusan  sela.  Pada  tanggal  the  interlocutory  decision  but  its  pustponed. 
14  Juni  2019  diadakan  sidang  dengan  agenda  On  March  28,  2019  a  hearing  was  held  with 
keterangan  saksi.  Pada  tanggal  26  Juni  2019  the  agenda  of  reading  the  interim  decision.  
diadakan sidang dengan agenda pemeriksaan saksi  On June 14, 2019 a trial was held with witness 
ahli.  Pada  tanggal  24  Juli  2019  digelar  sidang  testimony.  On  June  26,  2019  a  hearing  was 
dengan  agenda  pembacaan  Putusan  namun  tidak  held  with  the  expert  witness  examination 
dapat  dilaksanakan  karena  Majelis  Hakim  belum  agenda. On July 24, 2019 a hearing was held 
siap.   with  the  agenda  of  reading  the  Decision  but 
could not be carried out because the Panel of 
Judges was not ready.  
   
Putusan  Pengadilan  Negeri  tanggal  21  Agustus  Decision  of  the  District  Court  on  August  21, 
2019 yang amarnya berbunyi:  2019, where the ruling reads: 
a.  Dalam  Eksepsi  :  menyatakan  eksepsi  Tergugat  a.  In  Exception:  declare  the  Defendant's 
dapat diterima  exception as acceptable 
b.  Dalam Pokok Perkara :  b.  In Principal Case: 
  Menyatakan  Gugatan  Penggugat  tidak  dapat    Declares  Plaintiffs  Lawsuit  cannot  be 
diterima (Niet Ontvankelijke Verlklaard)  accepted  (Niet  Ontvankelijke 
Verlklaard) 
  Menghukum  Penggugat  untuk  membayar    Punish the Plaintiff to pay the court fee 
biaya perkara 
   
Pada  tanggal  4  September  2019,  Penggugat  telah  On  September  4,  2019,  the  Plaintiff  had  filed 
menyatakan banding atas perkara ini.  an appeal against this case. 
   
Sampai  dengan  tanggal  pelaporan,  Perusahaan  Up  to  the  reporting  date,  the  Company 
mempersiapkan kontra memori banding.  prepares counter memory appeal. 
   
14.  Perkara  Gugatan  Melawan  Hukum  Sengketa  14.  Lawsuits  Against  the  Law  of  Disputes  over  
Penyerobotan  Jalan/Saluran  Air  Milik  Desa,  pada  the  Village’s  Road/Waterway  Ownership,  in 
Proyek  Jalan  Tol  Krian  Legundi  Bunder  Manyar  the Krian Legundi Bunder Manyar (KLBM) Toll 
(KLBM).  Road Project. 
   
H.  Heru  Sudomo,  S.H.,  mengajukan  gugatan  H.  Heru  Sudomo,  S.H.,    filed  a  lawsuit  with  
ke  Pengadilan  Negeri  Gresik  dengan  Perkara  the  Gresik  District  Court  with  Case  
No. 14/Pdt.G/2019/PN.Gsk dengan tergugat:  No. 14/Pdt.G/2019/PN.Gsk with the defendant 
  are: 
-  Perusahaan (Tergugat I)  -  the Company (Defendant I) 
-  Kepala Desa Lebani Waras (Tergugat II)  -  Kepala  Desa  Lebani  Waras  (Defendant 
  II) 
   
Nilai  Gugatan  yang  diajukan  sebesar  The  value  of  lawsuit  filed  amounted  to  
Rp 1.820.000.000.  Rp 1,820,000,000. 
   

212
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada tanggal 19 Maret 2019 digelar sidang dengan  On  March  19,  2019  a  hearing  was  held  with 
agenda  pembacaan  gugatan. Pada  tanggal  13  Juni  the  agenda  of  reading  the  lawsuit.  On  June 
2019  diadakan  sidang  dengan  agenda  Replik  13, 2019 a hearing was held with the Plaintiff's 
Penggugat.  Pada  tanggal  20  Juni  2019  diadakan  Replic  agenda.  On  June  20,  2019  a  hearing 
sidang  dengan  agenda  Duplik  Tergugat.  Pada  was  held  with  the  Defendant's  Duplicate 
tanggal  27  Juni  2019  diadakan  sidang  dengan  agenda. On June 27, 2019 a hearing was held 
agenda  pembacaan  Putusan  Sela  dengan  Amar  with  the  agenda  of  reading  the  Interlocutory 
Putusan:  Decision with Amar Decision: 
-  Menolak Eksepsi Absolut Tergugat I  -  Refuse Absolute Defendant I's Exception 
-  Menyatakan  Pengadilan  Negeri  Gresik  -  Stating  that  the  Gresik  District  Court  is 
berwenang untuk mengadili perkara a quo  authorized to try the a quo case 
-  Menetapkan  biaya  yang  timbul  dari  perkara  ini  -  Determine  the  costs  arising  from  this  case 
akan ditetapkan pada putusan akhir  will be determined in the final decision 
 
Pada  tanggal  4  Juli  2019  digelar  sidang  dengan  On  July  4,  2019  a  hearing  was  held  with  the 
agenda  penyerahan  bukti  tertulis  dari  Penggugat.  agenda  of  submitting  written  evidence  from 
Pada  tanggal  11  Juli  2019  digelar  sidang  dengan  the  Plaintiff.  On  July  11,  2019  a  hearing  was 
agenda  Penyerahan  Bukti  Tertulis  dari  Tergugat.  held  with  the  agenda  of  Submitting  Written 
Pada  tanggal  25  Juli  2019  digelar  sidang  dengan  Evidence  from  the  Defendant.  On  July  25, 
agenda Pemeriksaan Saksi.   2019  a  hearing  was  held  with  the  agenda  of 
the Witness Examination.  
   
Pada  tanggal  27  September  2019  digelar  sidang  On  September  27,  2019  a  hearing  was  held 
dengan  agenda  Pemeriksaan  setempat.  Sidang  with  a  local  Examination  agenda.  The  next 
selanjutnya  diadakan  pada  tanggal  3  Oktober  2019  session  was  held  on  October  3,  2019  with  
dengan agenda kesimpulan.  the conclusion agenda. 
   
Sampai  dengan  tanggal  pelaporan,  Perusahaan  Up  to  the  date  of  reporting,  the  Company  is 
masih memonitor pelaksanaan sidang selanjutnya.  still  monitoring  the  implementation  of  the next 
hearing. 
   
15.  Perkara  Gugatan  Melawan  Hukum  Sengketa  15.  Lawsuits  Against  the  Law  of  Disputes  over  
Penyerobotan  Jalan/Saluran  Air  Milik  Desa,  pada  the  Village’s  Road/Waterway  Ownership,  in 
Proyek  Jalan  Tol  Krian  Legundi  Bunder  Manyar  the Krian Legundi Bunder Manyar (KLBM) Toll 
(KLBM).  Road Project. 
   
Supandi  Dkk  mengajukan  gugatan  ke  Pengadilan  Supandi  Dkk  filed  a  lawsuit  with  the  Gresik 
Negeri  Gresik  dengan  Perkara  District  Court  with  Case  
No.  19/Pdt.G/2019/PN.Gsk  dengan  Perusahaan  No. 19/Pdt.G/2019/PN.Gsk with  the Company 
sebagai Tergugat I.  as Defendant I.  
 
Nilai  Gugatan  yang  diajukan  sebesar  The  value  of  lawsuit  filed  amounted  to  
Rp 800.000.000.  Rp 800,000,000. 
   
Pada tanggal 13 Juni 2019 diadakan sidang dengan  On  June  13,  2019  a  hearing  was  held  with  
agenda  Jawaban  Tergugat.  Pada  tanggal  20  Juni  the  Defendant's  answer  agenda.  On  June  20, 
2019  diadakan  sidang  dengan  agenda  Replik  2019  a  hearing  was  held  with  the  Plaintiff's 
Penggugat.  Pada  tanggal  27  Juni  2019  diadakan  Replic  agenda.  On  June  27,  2019  a  hearing 
sidang  dengan  agenda  Duplik  Tergugat.  Pada  was  held  with  the  Defendant's  Duplicate 
tanggal 4 Juli 2019 diadakan sidang dengan agenda  agenda.  On  July  4,  2019  a  session  was  held 
Putusan  Sela  yang  pada  amarnya  bahwa  tidak  with the agenda of the Interim Decision which 
mengabulkan  Eksepsi  Absolut  dari  Tergugat  I  dan  in  its  ruling  that  it  did  not  grant  the  Absolute 
menetapkan  bahwa  Pengadilan  Negeri  Gresik  Exception of  Defendant I and determined that 
berwenang untuk memeriksa dan mengadili perkara  the  Gresik  District  Court  was  authorized  to 
a  quo.  Pada  tanggal  11  Juli  2019  diadakan  sidang  examine  and  try  the  a  quo  case.  On  July  11, 
dengan    agenda  Penyerahan bukti  dari  Penggugat.  2019  a  hearing  was  held  with  the  agenda  of 
Pada tanggal 25 Juli 2019 diadakan sidang dengan  Submitting evidence from the Plaintiff. On July 
agenda penyerahan  Bukti Tertulis dari Tergugat.   25, 2019 a hearing was held with the agenda 
of  submitting  Written  Evidence  from  
the Defendant.  
   
 
 

213
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada  tanggal  27  September  2019  digelar  sidang  On  September  27,  2019  a  hearing  was  held 
dengan  agenda  Pemeriksaan  setempat.  Sidang  with  a  local  Examination  agenda.  The  next 
selanjutnya  diadakan  pada  tanggal  7  Oktober  2019  session  was  held  on  October  7,  2019  with  
dengan agenda kesimpulan.  the conclusion agenda. 
   
Sampai  dengan  tanggal  pelaporan,  Perusahaan  Up  to  the  date  of  reporting,  the  Company  is 
masih memonitor pelaksanaan sidang selanjutnya.  still  monitoring  the  implementation  of  the next 
hearing. 
   
16.  Perkara  Gugatan  Melawan  Hukum  Subkon  Proyek  16.  Lawsuits  Against  the  Law  of  
Tol Kayu Agung – Palembang – Betung Seksi 2  the  Subcontractor  of  Kayu  Agung  – 
Palembang  –  Betung  Section  2  Toll  Road 
Issues 
   
PT  Telaga  Sari  Utama  mengajukan  gugatan  ke  PT  Telaga  Sari  Utama  filed  a  lawsuit  to  
Pengadilan Negeri Jakarta Selatan dengan Perkara  the  Jakarta  Selatan  District  Court  with  
No.  276/Pdt.G/2019/PN.Jkt.Sel dengan tergugat:  Case  No.  276/Pdt.G/2019/PN.Jkt.Sel  with  
  the defendant: 
  PT Bumiwarna Agung Perkasa (Tergugat)    PT  Bumiwarna  Agung  Perkasa 
  Perusahaan (Turut Tergugat)  (Defendant) 
    The Company (Co-Defendant) 
   
Nilai  Gugatan  kerugian  materiil  yang  diajukan  The  value  of  the  claim  for  material  losses 
sebesar  Rp  448.000.000  dan  Rp  840.213.000  dan  submitted  is  Rp  448,000,000  and  
kerugian imateriil sebesar Rp 2.000.000.000.  Rp  840,213,000  and  immaterial  losses  of  
Rp 2,000,000,000. 
   
Pada tanggal 20 Juni 2019 diadakan sidang dengan  On  June  20,  2019  a  session  was  held  with  
agenda  Mediasi  kedua.  Pada  tanggal  27  Juni  2019  the  second  Mediation  agenda.  On  June  27, 
diadakan  sidang  dengan  agenda  mediasi  ketiga.  2019  a  session  was  held  with  the  third 
Pada  tanggal  4  Juli  2019  digelar  sidang  dengan  mediation  agenda.  On  July  4,  2019  a  hearing 
agenda mediasi. Pada tanggal 8 Juli 2019 diadakan  was held with a mediation agenda. On July 8, 
sidang dengan  agenda  Pembacaan  Gugatan.  Pada  2019  a  hearing  was  held  with  the  reading  of 
tanggal  22  Juli  2019  diadakan  sidang  dengan  the  Lawsuit  agenda.  On  July  22,  2019  a 
agenda  penyerahan  Jawaban  oleh  Tergugat.  Pada  hearing  was  held  with  the  agenda  of 
tanggal 29 Juli 2019 digelar sidang dengan agenda  submitting  an  Answer  by  the  Defendant.  On 
Penyerahan  Replik  dari  Penggugat.  Sidang  July  29,  2019  a  hearing  was  held  with  
selanjutnya diadakan pada tanggal 19 Agustus 2019  the  agenda  of  Submitting  Replications  from 
dengan  agenda  Duplik  dari  Tergugat.  Sampai  the  Plaintiff.  The  next  session  was  held  on 
dengan  tanggal  pelaporan,  Perusahaan  masih  August 19, 2019 with the Duplic of  Defendant 
memonitor pelaksanaan sidang selanjutnya.  agenda. Until the reporting date, the Company 
is  still  monitoring  the  implementation  of  
the next hearing. 
   
17.  Perkara  Gugatan  Melawan  Hukum  Perkara  Lahan  17.  Lawsuit  Against  the  Law  on  Land  Issues  of 
Proyek Tol Ruas Jalan Tol Kunciran - Serpong  Kunciran – Serpong Toll Road Project 
   
Komang  Ani  Susana  mengajukan  gugatan  ke  Komang  Ani  Susana  filed  a  lawsuit  to  
Pengadilan  Negeri  Tangerang  dengan  Perkara  the  Tangerang  District  Court  with  Case  
No.  296/Pdt.G/2019/PN.Tng  dengan  Perusahaan  No.  296/Pdt.G/2019/PN.Tng  with  
sebagai Tergugat II.  the Company as Defendant II. 
 
Nilai  Gugatan  kerugian  materiil  yang  diajukan  The  value  of  the  claim  for  material  
sebesar  Rp  185.780.000.000  -  Rp  31.512.470.925  losses  submitted  is  Rp  185,780,000,000  –  
dan  kerugian  imateriil  sebesar  Rp  20.000.000.000  Rp 31,512,470,925 and and immaterial losses 
ditambah bunga 6%.  of Rp 20,000,000,000 add interest of 6%. 
   
Pada tanggal 26 Juni 2019 diadakan sidang dengan  On  June  26,  2019  a  session  was  held  with  
agenda  penyerahan  jawaban.  Pada  tanggal  30  Juli  the  answer  agenda.  On  30  July  2019  a 
2019  diadakan  sidang  dengan    agenda  mediasi.  hearing  was  held  with  a  mediation  agenda. 
Sidang  selanjutnya  diadakan  pada  tanggal  The next session was held on August 6, 2019 
6  Agustus  2019  dengan  agenda  mediasi  lanjutan.  with  further  mediation  agenda.  Until  
Sampai  dengan  tanggal  pelaporan,  Perusahaan  the  reporting  date,  the  Company  is  still 

214
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
masih memonitor pelaksanaan sidang selanjutnya.  monitoring  the  implementation  of  the  next 
hearing. 
   
18.  Perkara  Gugatan  Melawan  Hukum  Proyek  Kereta  18.  Lawsuit  Against  the  Law  on  Kereta  Cepat 
Cepat Indonesia Cina (KCIC)  Idonesia Cina (KCIC) Project 
   
Bob  Goldman  mengajukan  gugatan  ke  Pengadilan  Bob  Goldman  filed  a  lawsuit  to  
Negeri  Jakarta  Timur  dengan  Perkara  the  Jakarta  Timur  District  Court  with  Case  
No. 149/Pdt.G/2019/PN.Jkt.Tim dengan Perusahaan  No.  149/Pdt.G/2019/PN.Jkt.Tim  with  
sebagai Tergugat XVI.  the Company as Defendant XVI. 
 
Nilai  Gugatan  yang  diajukan  sebesar   The  value  of  lawsuit  filed  amounted  to  
Rp 30.000.000/M2 x 8.598.988 M2.  Rp 30,000,000/M2 x 8,598,988 M2. 
   
Pada tanggal 26 Juni 2019 diadakan sidang dengan  On  June  26,  2019  a  hearing  was  held  with  
agenda  Panggilan  Tergugat.  Pada  tanggal  3  Juli  the Defendant's Call agenda. On July 3, 2019 
2019  diadakan  agenda  perbaikan  gugatan.  Pada  a lawsuit repair agenda was held. On July 17, 
tanggal  17  Juli  2019  diadakan  sidang  dengan  2019  a  hearing  was  held  with  the  agenda  of 
agenda  Panggilan  kepada  Tergugat  yang  belum  the  Call  to  the  Defendant  who  was  not 
hadir.  Pada  tanggal  31  Juli  2019  diadakan  sidang  present. On July 31, 2019 a hearing was held 
dengan  agenda  Perbaikan  Surat  Kuasa  oleh  with  the  agenda  of  Improving  Power  of 
Penggugat.  Pada  tanggal  25  September  2019  Attorney  by  the  Plaintiff.  On  September  25, 
digelar  sidang  dengan  agenda  Mediasi  II.  Sidang  2019  a  hearing  was  held  with  the  agenda  of 
selanjutnya  diadakan  pada  tanggal  2  Oktober  2019  Mediation  II.  The  next  session  was  held  on 
dengan agenda Mediasi III. Sampai dengan tanggal  October 2, 2019 with the agenda of Mediation 
pelaporan,  Perusahaan  masih  memonitor  III.  Until  the  reporting  date,  the  Company  is 
pelaksanaan sidang selanjutnya.  still  monitoring the implementation of the next 
hearing. 
   
19.  Perkara  Gugatan  Melawan  Hukum  Permasalahan  19.  Lawsuit  Against  the  Law  on  Land  Issues  of 
Lahan  Pete  Subur  Proyek  Jalan  Tol  Pematang  Pete  Subur  Pematang  Panggang  –  Kayu 
Panggang – Kayu Agung (PPKA)  Agung (PPKA) Toll Road Project 
   
Kuasa  Penggugat  Pete  Subur  dan  Anwar  Sadat  Plaintiff Counsel Pete Subur and Anwar Sadat 
mengajukan  gugatan  ke  Pengadilan  Negeri  Kayu  filed a lawsuit to the Kayu Agung District Court 
Agung  dengan  Perkara  No.  6/Pdt.G/2019/PN.Kag  with  Case  No.  6/Pdt.G/2019/PN.Kag  with  
dengan Perusahaan sebagai Tergugat V.  the Company as Defendant V. 
 
Nilai  Gugatan  kerugian  materiil  yang  diajukan  The  value  of  the  claim  for  material  
sebesar Rp 4.650.000.000.  losses submitted is Rp 4,650,000,000. 
   
Pada tanggal 20 Juni 2019 diadakan sidang dengan  On  June  20,  2019  a  hearing  was  held  with  
agenda  penyerahan  jawaban  oleh  Tergugat.  Pada  the Defendant's answer agenda. On June 26, 
tanggal  26  Juni  2019  diadakan  sidang  dengan  2019  a  hearing  was  held  with  the  Plaintiff's 
agenda  Penyerahan  Replik  oleh  Penggugat.  Pada  Replical  Submission  agenda.  On  July  18, 
tanggal  18  Juli  2019  diadakan  sidang  dengan  2019  a  hearing  was  held  with  the  agenda  of 
agenda  Penyerahan  Replik  dari  Penggugat.  Pada  Submitting  Replications  from  the  Plaintiff.  On 
tanggal  25  Juli  2019  diadakan  sidang  dengan  July  25,  2019  a  hearing  was  held  with  
agenda  Penyerahan  Duplik  dari  Tergugat.  Pada  the  agenda  of  Submission  of  Duplicates  from 
tanggal  5  September  2019  digelar  sidang  dengan  Defendants. On September 5, 2019 a hearing 
agenda  penyerahan  bukti.  Sampai  dengan  tanggal  was  held  with  the  agenda  of  submitting 
pelaporan,  Perusahaan  masih  memonitor  evidence.  Until  the  reporting  date,  
pelaksanaan sidang selanjutnya.  the  Company  is  still  monitoring  
the implementation of the next hearing. 
   
20.  Perkara  Gugatan  Melawan  Hukum  Permasalahan  20.  Lawsuit Case Against the Law of the Problem 
Pembagian  Lahan  Kalitjang,  Jatisampurna  Bekasi  of  Land  Distribution  Kalitjang,  Jatisampurna 
Proyek CCT Seksi I  Bekasi CCT Project Section I 
   
Timah  Binti  H.  Kalitjang,  dkk  mengajukan  gugatan  Timah Binti Kalitjang, et al filed a lawsuit with 
ke  Pengadilan  Negeri  Bekasi  dengan  Perkara  the  Bekasi  District  Court  with  the  Case  
No.  176/Pdt.G/2019/PN.Bks  dengan  Perusahaan  No.  176/Pdt.G/2019/PN.Bks  with  
sebagai Tergugat III.  the Company as Defendant III. 

215
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Nilai  Gugatan  kerugian  materiil  yang  diajukan  The  value  of  the  claim  for  material  
sebesar Rp 1.750.000.000.  losses submitted is Rp 1,750,000,000. 
   
Pada  tanggal  23  Juli  2019  digelar  sidang  dengan  On  July  23,  2019  a  hearing  was  held  with  
Agenda  Penentuan  tanggal  Mediasi.  Pada  tanggal  the  Agenda  for  determining  the  Mediation 
17  September  2019  digelar  sidang  dengan  agenda  date.  On  September  17,  2019  a  hearing  was 
Pembuktian  dari  Penggugat.  Sidang  selanjutnya  held  with  the  agenda  of  Evidence  from  
diadakan  pada  tanggal  1  Oktober  2019  dengan  the  Plaintiff.  The  next  session  was  held  on 
agenda pemeriksaan bukti lanjutan. Sampai dengan  October  1,  2019  with  the  agenda  of  further 
tanggal  pelaporan,  Perusahaan  masih  memonitor  evidence  examination.  Until  the  reporting 
pelaksanaan sidang selanjutnya.  date,  the  Company  is  still  monitoring  
the implementation of the next hearing. 
   
21.  Perkara  Gugatan  Melawan  Hukum  Permasalahan  21.  Lawsuit Against the Law on Land Problems in 
Lahan Proyek Kunciran Serpong  the Serpong Kunciran Project 
   
Adiwikarta  dan  Sujiatmi  mengajukan  gugatan  ke  Adiwikarta  and  Sujiatmi  filed  a  lawsuit  
Pengadilan  Negeri  Tangerang  dengan  Perkara  with  the  Tangerang  District  Court  with  a  
No.  666/Pdt.G/2019/PN.Tng  dengan  Perusahaan  Case  No.  666/Pdt.G/2019/PN.Tng  with  
sebagai Tergugat I.  the Company as Defendant I. 
 
Nilai  Gugatan  kerugian  materiil  yang  diajukan  The  value  of  the  claim  for  material  loss 
sebesar  Rp  9.585.250.000  dan  imateriil  sebesar   amounted  to  Rp  9,585,250,000  and 
Rp 5.000.000.000.  immaterial amount Rp 5,000,000,000. 
   
Pada  tanggal  30  Juli  2019  terdapat  panggilan  On July 30, 2019 there was a subpoena from 
sidang  dari  Pengadilan  Negeri  Tangerang  untuk  the  Tangerang  District  Court  to  be  present  at 
hadir  di  Persidangan  Pertama.  Pada  tanggal  18  the  First  Trial.  On  September  18,  2019  a 
September  2019  digelar  sidang  dengan  agenda  hearing  was  held  with  a  mediation  agenda. 
mediasi.  Sidang  selanjutnya  digelar  pada  tanggal  9  The  next  session  was  held  on  October  9, 
Oktober  2019  dengan  agenda  Jawaban  dari  2019  with  the  agenda  of  the  Defendant's 
Tergugat.  Sampai  dengan  tanggal  pelaporan,  Answer Until the reporting date,  the Company 
Perusahaan  masih  memonitor  pelaksanaan  sidang  is  still  monitoring  the  implementation  of  
selanjutnya.  the next hearing. 
   
54. SIFAT DAN TRANSAKSI PIHAK-PIHAK BERELASI   54. NATURE AND TRANSACTIONS WITH
RELATED PARTIES 
 
Sifat hubungan berelasi  Nature of relationship 
   
a.  Pemerintah  Republik  Indonesia  melalui  a.  The Government of the Republic of Indonesia 
Kementerian  Keuangan  adalah  pemegang  saham  represented  by  the  Ministry  of  Finance,  is              
utama Perusahaan.  the Company’s main shareholder. 
   
b.  Seluruh entitas yang dimiliki dan dikendalikan oleh  b.  All  entities  that  are  owned  and  controlled  by 
Kementerian  Keuangan  Pemerintah  Republik  the  Ministry  of  Finance  of  the  Republic  of 
Indonesia  serta  entitas  dimana  Kementerian  Indonesia  including  entities  where              
Keuangan  Pemerintah  Republik  Indonesia  the Ministry of Finance Republic of Indonesia 
memiliki  pengaruh  signifikan:  Badan  Usaha  Milik  have  significant  influence:  State-owned 
Negara (BUMN).  Enterprise (SOE). 
   
c.  Pihak  berelasi  yang  pemegang  saham  utamanya  c.  Related parties which main shareholder is the 
sama dengan Grup.    same with the Group. 
   
d.  Pihak  berelasi  yang  merupakan  Perusahaan  d.  Related  parties  which  are  associates  of      
asosiasi dari entitas anak.  the Company’s subsidiaries. 
   
e.  Manajemen  kunci  yang  meliputi  anggota  dewan  e.  Key  management  personnel  includes 
Komisaris dan Direksi Perusahaan.  Commissioners  and  Directors  of       
the Company. 
   
 
 
 

216
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Transaksi pihak berelasi  Transactions with related parties 
   
Berikut ini adalah transaksi dengan entitas berelasi:  The following are transactions with related parties: 
  
 
Pihak-pihak Berelasi / Related Parties Transaksi Transactions
Brantas - Waskita Investasi pada Ventura Bersama Investment in Joint Ventures
HK - Waskita Investasi pada Ventura Bersama Investment in Joint Ventures
Indonesia Eximbank  Kas dan Setara Kas, Utang Bank Jangka Pendek, LC/BG/SKBDN Cash and Cash Equivalent, Short Term Bank Loan, Bank Guarantee/LC/SKBDN
PP - Waskita Investasi pada Ventura Bersama Investment in Joint Ventures
PT Angkasa Pura I (Persero) Piutang Usaha, Piutang Retensi, Tagihan Bruto, Pendapatan Accounts Receivable, Retention Receivable, Gross Amount due to from Customer, Revenues

PT Angkasa Pura II (Persero) Tagihan Bruto, Pendapatan Gross Amount due to from Customer, Revenues


PT Bank BNI Syariah Kas dan Setara Kas, Utang Bank Jangka Panjang Cash and Cash Equivalent, Long Term Bank Loan
PT Bank BRIsyariah Tbk Kas dan Setara Kas, Utang Bank Jangka Pendek, Utang Bank Jangka Panjang Cash and Cash Equivalent, Short Term Bank Loan, Long Term Bank Loan
PT Bank Mandiri (Persero) Tbk Kas dan Setara Kas, Investasi Jangka Pendek, Utang Bank Jangka Pendek, LC/BG/SKBDN Cash and Cash Equivalent, Short Termn Investments, Short Term Bank Loan, Bank 
Guarantee/LC/SKBDN
PT Bank Negara Indonesia (Persero) Tbk Kas dan Setara Kas, Utang Bank Jangka Pendek, Utang Bank Jangka Panjang,  Cash and Cash Equivalent, Short Term Bank Loan, Long Term Bank Loan, Bank 
LC/BG/SKBDN Guarantee/LC/SKBDN
PT Bank Rakyat Indonesia (Persero) Tbk Kas dan Setara Kas, Utang Bank Jangka Pendek, Utang Bank Jangka Panjang,  Cash and Cash Equivalent, Short Term Bank Loan, Long Term Bank Loan, Bank 
LC/BG/SKBDN Guarantee/LC/SKBDN
PT Bank Syariah Mandiri Kas dan Setara Kas, Utang Bank Jangka Pendek Cash and Cash Equivalent, Short Term Bank Loan
PT Bank Tabungan Negara (Persero) Tbk Kas dan Setara Kas, Utang Bank Jangka Pendek, Utang Bank Jangka Panjang Cash and Cash Equivalent, Short Term Bank Loan, Long Term Bank Loan
PT Cinere Serpong Jaya Piutang Usaha, Piutang Retensi, Piutang Lain-lain, Tagihan Bruto, Pendapatan Accounts Receivable, Retention Receivable, Others Receivable, Gross Amount due to from 
Customer, Revenues
PT Dok dan Perkapalan Kodja Bahari (Persero) Piutang Usaha Accounts Receivable
PT Hotel Indonesia Natour (Persero) Piutang Usaha Accounts Receivable
PT Istaka Karya (Persero) Piutang Usaha, Piutang Lain-lain Accounts Receivable, Others Receivable
PT Jasamarga Jalan Layang Cikampek Tagihan Bruto, Pendapatan Gross Amount due to from Customer, Revenues
PT Jasamarga Ngawi Kertosono Kediri Piutang Usaha, Piutang Retensi, Piutang Lain-lain Accounts Receivable, Retention Receivable, Others Receivable
PT Jasamarga Semarang Batang Piutang Usaha, Tagihan Bruto, Pendapatan Accounts Receivable, Gross Amount due to from Customer, Revenues
PT Jasamarga Solo Ngawi Piutang Usaha, Piutang Retensi, Tagihan Bruto, Pendapatan Accounts Receivable, Retention Receivable, Gross Amount due to from Customer, Revenues

PT Kereta Api Indonesia (Persero) Tagihan Bruto Gross Amount due to from Customer


PT Kertas Leces (Persero) Piutang Usaha Accounts Receivable
PT PAL Indonesia (Persero) Piutang Dagang, Tagihan Bruto Trade Receivable, Gross Amount due to from Customer
PT Pejagan Pemalang Toll Road Piutang Retensi, Piutang Lain-lain Retention Receivable, Others Receivable
PT Pelabuhan Indonesia II (Persero) Piutang Dagang Trade Receivable
PT Pembangunan Perumahan (Persero) Tbk Piutang Dagang Trade Receivable
PT Pertamina (Persero) Piutang Dagang Trade Receivable
PT Perusahaan Listrik Negara (Persero)  Piutang Retensi, Piutang Lain-lain, Tagihan Bruto, Uang Muka Kontrak Jangka Pendek,  Accounts Receivable, Others Receivable, Gross Amount due to from Customer, Advance on 
Pendapatan Short Term Contract, Revenues
PT Prima Multi Terminal Piutang Usaha, Piutang Retensi, Tagihan Bruto Accounts Receivable, Retention Receivable, Gross Amount due to from Customer
PT Sarana Multi Infrastruktur (Persero) Lembaga Keuangan Non Bank, Utang Lain-lain Jangka Panjang, Pendapatan Loan to Financial Institution Non Bank, Others Long Term Payable, Revenue
PT Transjawa Paspro Jalan Tol Piutang Usaha, Piutang Retensi, Tagihan Bruto, Pendapatan Accounts Receivable, Retention Receivable, Gross Amount due to from Customer, Revenues

PT Waskita Transjawa Toll Road Piutang Lain-lain Others Receivable


RNI Waskita Tagihan Bruto Gross Amount due to from Customer
Waskita - Acset Piutang Dagang Trade Receivable
Waskita - Adhi Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - Brantas - Wika Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - Gorip Nanda Guna Piutang Dagang Trade Receivable
Waskita - HK  Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - HK - Wika  Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - NK  Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - PP Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - PP - HK Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - PP - Wika Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - Wika Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - Wika - PP - HK Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - Wika - PP - HK - Adhi Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - Yodya Karya Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita Karya - Triniti Piutang Dagang Trade Receivable
Wika - Waskita Investasi pada Ventura Bersama Investment in Joint Ventures
Wika - Waskita - Nindya Investasi pada Ventura Bersama Investment in Joint Ventures
WKR - Darmo Permai Piutang Lain-lain Others Receivable
WKR - RNI Piutang Usaha Accounts Receivable

 
 
 
 
 
 
 
 
 
 
 
 
 

217
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Rincian  item  yang  terkait  dengan  transaksi  pihak-pihak    The  detail  of  items  associated  with  the  related 
yang berelasi:  parties transaction:  
     
30 September/ 31 Desember/ 30 September/ 31 Desember/
Aset September 30, 2019 December 31, 2018 September 30, 2019 December 31, 2018 Assets
Rp Rp % %
Kas dan Setara kas 2.873.106.846.569  8.970.687.634.778  2,09% 7,21% Cash and Cash Equivalent
Piutang Usaha 6.222.694.024.900  2.242.057.577.361  4,53% 1,80% Accounts Receivable
Piutang Retensi 1.163.873.403.181  954.996.413.765  0,85% 0,77% Retention Receivable
Piutang Lain-lain 4.671.566.598.807  3.667.877.542.828  3,40% 2,95% Others Receivable
Tagihan Bruto 25.645.068.542.574  24.937.285.230.226  18,69% 20,05% Gross Amount due to from Customer
Aset Ventura Bersama  562.792.037.862  819.604.236.921  0,41% 0,66% Joint Ventures Assets
 
Persentase  di  atas  merupakan  perbandingan  dengan    The  percentage  above  is  a  comparison  with  
jumlah aset.  the total of assets. 
     
30 September/ 31 Desember/ 30 September/ 31 Desember/
Liabilitas September 30, 2019 December 31, 2018 September 30, 2019 December 31, 2018 Liabilities
Rp Rp % %
Utang Bank 36.213.754.883.872  30.996.573.678.529  33,53% 32,46% Bank Loan
Uang Muka Kontrak 101.440.156.293  86.841.759.501  0,09% 0,09% Advance on Contract
 
Persentase  di  atas  merupakan  perbandingan  dengan    The  percentage  above  is  a  comparison  with  
jumlah liabilitas.  the total of liabilities. 
     
30 September/ September 30, 30 September/ September 30,
2019 2018 2019 2018
Rp Rp % %
Pendapatan Usaha 7.597.225.217.696  19.743.564.472.000  34,51% 54,49% Revenue

Persentase  di  atas  merupakan  perbandingan  dengan    The  percentage  above  is  a  comparison  with  the 
total pendapatan usaha.  total of revenue. 
 
  
55. PERJANJIAN   55. AGREEMENTS 

a.  Kontrak Konstruksi   a. Construction Contract


     
Pada  tanggal  30  September  2019,  berikut  perikatan    As of September 30, 2019, following the details 
dan perjanjian dalam rangka aktivitas konstruksi:  of  commitments  and  agreement  related  to 
construction activity: 
   
   
Nilai Kontrak/ Pemberi Kerja/ Mulai/ Selesai/ Keterangan/
No. Nama Proyek/ Project Name Nomor Kontrak/ Contract Number Contract Value Owner Start Finish Remark

Addendum Dalam
01/KNT/LRTSS/VI/2016 dan Nomor : Kementerian Perhubungan/ The Ministry of
1 Pembangunan Light Rail Transit di Provinsi Sumatera Selatan (General)        6.068.097.902.624  21-Okt-15 31-Mei-19 Proses/ Addendum in
01/WK-KEMENHUB.LRT/D.II/2016 Transportation
Process
Pekerjaan Pembangunan Jalan Tol Kayu Agung-Palembang-Betung Paket II Belum Jatuh Tempo/
2  17/ADD/Kontrak S1.S2.S3-WK/2019        4.200.987.596.300  PT Waskita Sriwijaya Tol 30-Mei-16 30-Okt-19
Seksi 1 : STA 13+400 - STA 33+500 Not Due Yet
Belum Jatuh Tempo/
3 Pekerjaan Pembangunan Jalan Tol Krian - Legundi - Bunder - Manyar 07/ADD/SPPJK/WBW/2017        3.724.136.777.273  PT Waskita Bumi Wira (WBW) 13-Des-16 12-Des-20
Not Due Yet
Pekerjaan Pembangunan Jalan Tol Cibitung-Cilincing STA. -0+400 - STA. 007/ADDVII/KONTRAK/WK- Belum Jatuh Tempo/
4        3.339.169.389.993  PT Cibitung Tanjung priok Port Tollways 11-Sep-17 27-Feb-20
30+200 dan STA. 32+800 - STA. 33+618 CTP/VIII/2019 Not Due Yet
Addendum Dalam
5 Paket 1 : Pengandaan Transmisi 500 KV Sumatera, New Aur Duri - Peranap 0532.PJ/DAN.02.02/DIR/2015        3.061.228.801.014  PT Perusahaan Listrik Negara (Persero) 29-Okt-15 23-Mei-19 Proses/ Addendum in
Process
Belum Jatuh Tempo/ 
6 Jalan Tol Jakarta-Cikampek II Selatan Paket III - Induk 11/BA.JJS/2019        2.634.858.146.150  PT Jasamarga Japek Selatan 07-Feb-19 07-Sep-20
Not Due Yet
ADDENDUM IV 10/KONTRAK- Belum Jatuh Tempo/ 
7 Pekerjaan Pembangunan Jalan Tol Ruas Serpong-Cinere Seksi I        2.581.660.994.552  PT Cinere Serpong Jaya 01-Agu-17 31-Jan-20
BOR/CSJ/2017 Not Due Yet
Addendum Dalam
Pekerjaan Pembangunan Jalan Bebas Hambatan & Tol Trans Sumatera 3 
8 DPBJT/FE.2970B/S.Perj.75A/X/2018        2.445.855.454.545  PT Hutama Karya (HK) 16-Jun-15 30-Nov-18 Proses/ Addendum in
Section Bakauheni - Terbanggi Besar
Process
 
 

 
 
 

218
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Jangka Waktu/ Time Period
Nilai Kontrak/ Pemberi Kerja/ Mulai/ Selesai/ Keterangan/
No. Nama Proyek/ Project Name Nomor Kontrak/ Contract Number Contract Value Owner Start Finish Remark

Addendum Dalam
9 Jln Tol Terbanggi Besar- Pematang Panggang (Zona HK-2) DU/AF.403.2/S.Perj.7.2/2019        2.122.580.439.880  PT Hutama Karya 16-Jun-17 30-Jun-19 Proses/ Addendum in
Process
Belum Jatuh Tempo/
10 Transmisi 500kV Paket 3 Muara Enim-New Aurduri (Struktur Atas) 0372-I.PJ/DAN.02.02/DIR/2017        1.995.928.346.960  PT Perusahaan Listrik Negara (Persero) 07-Jul-17 06-Jul-20
Not Due Yet
Addendum Dalam
11 Paket 2 : Pengandaan Transmisi 500 KV Sumatera, Peranap - Perawang 0533.PJ/DAN.02.02/DIR/2015        1.993.696.331.928  PT Perusahaan Listrik Negara (Persero) 29-Okt-15 23-Mei-19 Proses/ Addendum in
Process

Proyek Pembangunan JalanTol Kayu Agung - Palembang - Betung Paket IV Belum Jatuh Tempo/
12 05/KONTRAKS2.S3-WK/2016        1.550.328.927.273  PT Sriwijaya Markmore Persada (SRIMP) 20-Des-16 06-Okt-19
(Seksi 2 : Sta. 52+200 - 67+400 dan Seksi 3 : Sta. 67+400 s Sta. 96+000) Not Due Yet

Pekerjaan Pembangunan Jalan Tol Cibitung-Cilincing STA. -0+400 - STA. 007/ADDVII/KONTRAK/WK- Belum Jatuh Tempo/
13        1.417.047.472.417  PT Cibitung Tanjung priok Port Tollways 11-Sep-17 27-Feb-20
30+200 dan STA. 32+800 - STA. 33+618 CTP/VIII/2019 Not Due Yet
Pekerjaan Pembangunan Jalan Tol Kayu Agung-Palembang-Betung Paket I Belum Jatuh Tempo/
14 16/ADD/KONTRAK.S1-WK/2019        1.384.539.475.000  PT. Waskita Sriwijaya Tol 02-Jun-17 30-Okt-19
Seksi 1 Not Due Yet
Addendum Dalam
300/AA- PT Jasamarga Solo Ngawi (JSN) (d/h/ 
15 Pembangunan Jalan Tol Solo - Ngawi Seksi SN. 2A        1.269.049.939.859  30-Jun-15 30-Sep-18 Proses/ Addendum in
JSN/ADD.XII.KONTRAKTOR/XII/2018 formerly PT Solo Ngawi Jaya)
Process
Pekerjaan Pembangunan Jalan Tol Cibitung-Cilincing STA. -0+400 - STA. 007/ADDVII/KONTRAK/WK- Belum Jatuh Tempo/
16        1.263.865.608.635  PT Cibitung Tanjung priok Port Tollways 11-Sep-17 27-Feb-20
30+200 dan STA. 32+800 - STA. 33+618 CTP/VIII/2019 Not Due Yet
Addendum Dalam
PT Jasamarga Solo Ngawi (JSN) (d/h/ 
17 Pembangunan Jalan Tol Solo - Ngawi Seksi SN. 1A 296/AA-JSN/ADD-X.WSKT/XII/2018        1.201.176.901.864  30-Jun-15 31-Des-18 Proses/ Addendum in
formerly PT Solo Ngawi Jaya)
Process
Addendum Dalam
PT Jasamarga Solo Ngawi (JSN) (d/h/ 
18 Pembangunan Jalan Tol Solo - Ngawi Seksi SN. 1B 296/AA-JSN/ADD-X.WSKT/XII/2018        1.181.241.611.524  30-Jun-15 31-Des-18 Proses/ Addendum in
formerly PT Solo Ngawi Jaya)
Process
Addendum Dalam
01/KNT/LRTSS/VI/2016 dan Nomor : Kementerian Perhubungan/ The Ministry of
19 Pembangunan Light Rail Transit di Provinsi Sumatera Selatan (Zona V)        1.174.399.097.764  21-Okt-15 31-Mei-19 Proses/ Addendum in
01/WK-KEMENHUB.LRT/D.II/2016 Transportation
Process
Addendum Dalam
01/KNT/LRTSS/VI/2016 dan Nomor : Kementerian Perhubungan/ The Ministry of
20 Pembangunan Light Rail Transit di Provinsi Sumatera Selatan (Zona III)        1.163.821.158.820  21-Okt-15 31-Mei-19 Proses/ Addendum in
01/WK-KEMENHUB.LRT/D.II/2016 Transportation
Process
Addendum Dalam
01/KNT/LRTSS/VI/2016 dan Nomor : Kementerian Perhubungan/ The Ministry of
21 Pembangunan Light Rail Transit di Provinsi Sumatera Selatan (Zona II)        1.079.731.303.500  21-Okt-15 31-Mei-19 Proses/ Addendum in
01/WK-KEMENHUB.LRT/D.II/2016 Transportation
Process

Pembangunan Jalan Tol Bekasi-Cawang-Kampung Melayu Seksi 2D. 1 Sisi  Belum Jatuh Tempo/


22 82/ADD-IV/SP/KKDM/IV/2019           996.645.639.851  PT Kresma Kusuma Dyandra Marga 30-Okt-17 31-Okt-19
Utara Sta. 10+677 sd Sta. 15+507 dan Sisi Selatan Sta. 12+015 sd 15+445 Not Due Yet

Proyek Pembangunan JalanTol Kayu Agung - Palembang - Betung Paket IV Belum Jatuh Tempo/
23 05/KONTRAKS2.S3-WK/2016           975.638.029.962  PT Sriwijaya Markmore Persada (SRIMP) 20-Des-16 06-Okt-19
(Seksi 2 : Sta. 52+200 - 67+400 dan Seksi 3 : Sta. 67+400 s Sta. 96+000) Not Due Yet

Addendum Dalam
24 Jalan Tol Pematang Panggang-Kayu Agung (Seksi 2A) DU/AF.403.2/S.Perj.7.2/2019           957.997.883.363  PT Hutama Karya 16-Jun-17 30-Jun-19 Proses/ Addendum in
Process
Pekerjaan Pembangunan (design & build) Jalan Tol Tebing Tinggi-Parapat 
Belum Jatuh Tempo/
25 (Tahap 1) Ruas Tebing Tinggi-Serbelawan (STA 00+000 sd 30+000) termasuk  002/KONTRAK-HMW/VI/2018           939.505.078.090  PT Hutama Marga Waskita 29-Jun-18 29-Jun-20
Not Due Yet
Simpang Susun Serbelawan
Addendum Dalam
Pembangunan jalan tol Cimanggis Cibitung Seksi I : STA. 23+900 - STA.
26 10/ADD-XI/JKP/CCT/2018           900.418.180.000  PT Cimanggis Cibitung Tollways (CCT) 09-Okt-15 01-Jul-19 Proses/ Addendum in
27+070
Process
Addendum Dalam
300/AA- PT Jasamarga Solo Ngawi (JSN) (d/h/ 
27 Pembangunan Jalan Tol Solo - Ngawi Seksi SN. 2B           889.233.365.965  30-Jun-15 30-Nov-18 Proses/ Addendum in
JSN/ADD.XII.KONTRAKTOR/XII/2018 formerly PT Solo Ngawi Jaya)
Process
Addendum Dalam
28 Jln Tol Terbanggi Besar- Pematang Panggang (Zona HK-3) DU/AF.403.2/S.Perj.7.2/2019           875.241.872.794  PT Hutama Karya 16-Jun-17 30-Jun-19 Proses/ Addendum in
Process
Addendum Dalam
29 Jalan Tol Becakayu Seksi 2A Ujung 86.3/S.Per/KKDM/II/2019           772.934.636.364  PT Kresna Kusuma Dyandra Marga 08-Feb-19 06-Sep-19 Proses/ Addendum in
Process
Addendum Dalam
01/KNT/LRTSS/VI/2016 dan Nomor : Kementerian Perhubungan/ The Ministry of
30 Pembangunan Light Rail Transit di Provinsi Sumatera Selatan (Zona IV)           742.413.726.581  21-Okt-15 31-Mei-19 Proses/ Addendum in
01/WK-KEMENHUB.LRT/D.II/2016 Transportation
Process
Pekerjaan Pembangunan Jalan Tol Kayu Agung-Palembang-Betung Paket I  Belum Jatuh Tempo/
31 16/ADD/KONTRAK.S1-WK/2019           735.651.207.500  PT. Waskita Sriwijaya Tol 02-Jun-17 30-Okt-19
Seksi 1B Not Due Yet
Pembangunan Pembangkit Listrik Tenaga Air (PLTA) Wado di Kabupaten  Belum Jatuh Tempo/
32 01/PLTA/WWE-WSKT/2017           716.732.000.000  PT Waskita Wado Energi 15-Des-17 15-Des-19
Sumedang, Provinsi Jawa Barat Not Due Yet
Addendum Dalam
HK.02.03/SATKER-
33 Pembangunan Bendungan Raknamo di Kabupaten Kupang           690.909.072.727  Kemen PU-Dirjen SDA 04-Des-14 11-Feb-19 Proses/ Addendum in
NVT/BEND.I/AMD/137/IV/2018
Process
Pekerjaan Pembangunan Jalan Tol Cibitung-Cilincing STA. -0+400 - STA. 007/ADDVII/KONTRAK/WK- Belum Jatuh Tempo/
34           645.884.554.670  PT Cibitung Tanjung priok Port Tollways 11-Sep-17 27-Feb-20
30+200 dan STA. 32+800 - STA. 33+618 CTP/VIII/2019 Not Due Yet
Belum Jatuh Tempo/
35 Transmisi 500kV Paket 3 Muara Enim-New Aurduri (Struktur Bawah) 0372-I.PJ/DAN.02.02/DIR/2017           614.044.653.040  PT Perusahaan Listrik Negara (Persero) 07-Jul-17 06-Jul-20
Not Due Yet
Addendum Dalam
36 Paket 1 : Pengandaan Transmisi 500 KV Sumatera, New Aur Duri - Peranap 0532.PJ/DAN.02.02/DIR/2015           591.761.831.974  PT Perusahaan Listrik Negara (Persero) 29-Okt-15 23-Mei-19 Proses/ Addendum in
Process
Pekerjaan Pembangunan (design & build) Jalan Tol Tebing Tinggi-Parapat 
Belum Jatuh Tempo/
37 (Tahap 1) Ruas Tebing Tinggi-Serbelawan (STA 00+000 sd 30+000) termasuk  002/KONTRAK-HMW/VI/2018           553.174.088.000  PT Hutama Marga Waskita 29-Jun-18 29-Jun-20
Not Due Yet
Simpang Susun Serbelawan
 

219
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Jangka Waktu/ Time Period
Nilai Kontrak/ Pemberi Kerja/ Mulai/ Selesai/ Keterangan/
No. Nama Proyek/ Project Name Nomor Kontrak/ Contract Number Contract Value Owner Start Finish Remark

Addendum Dalam
01/KNT/LRTSS/VI/2016 dan Nomor : Kementerian Perhubungan/ The Ministry of
38 Pembangunan Light Rail Transit Jembatan Sungai Musi           466.216.068.247  21-Okt-15 31-Mei-19 Proses/ Addendum in
01/WK-KEMENHUB.LRT/D.II/2016 Transportation
Process
Belum Jatuh Tempo/
39 Jembatan Penghubung Pulau 2B Kosambi KML/PO/04/17/00025           454.410.000.000  PT Kukuh Mandiri Lestari 27-Jul-17 28-Feb-20
Not Due Yet
Addendum Dalam
40 Jln Tol Terbanggi Besar- Pematang Panggang (Zona HK-1) DU/AF.403.2/S.Perj.7.2/2019           448.311.023.038  PT Hutama Karya 16-Jun-17 30-Jun-19 Proses/ Addendum in
Process
Addendum Dalam
41 Paket 2 : Pengandaan Transmisi 500 KV Sumatera, Peranap - Perawang 0533.PJ/DAN.02.02/DIR/2015           441.297.527.509  PT Perusahaan Listrik Negara (Persero) 29-Okt-15 23-Mei-19 Proses/ Addendum in
Process
Belum Jatuh Tempo/
42 Apron Bandara Sultan Hasanuddin PJKP-19003592           422.000.000.000  PT Angkasa Pura 18-Feb-19 10-Des-19
Not Due Yet
Pekerjaan Pembangunan Koneksi Jalan Tol Bekasi-Cawang-Kampung Melayu  Belum Jatuh Tempo/
43 35/SP/KKDM/XII/2017           383.324.235.111  PT Kresma Kusuma Dyandra Marga 05-Des-17 31-Okt-19
dengan Jalan Tol Wiyoto Wiyono Not Due Yet
Addendum Dalam
44 Paket 1 : Pengandaan Transmisi 500 KV Sumatera, New Aur Duri - Peranap 0532.PJ/DAN.02.02/DIR/2015           373.294.896.681  PT Perusahaan Listrik Negara (Persero) 29-Okt-15 23-Mei-19 Proses/ Addendum in
Process
Pekerjaan Pembangunan (design & build) Jalan Tol Tebing Tinggi-Parapat 
Belum Jatuh Tempo/
45 (Tahap 1) Ruas Tebing Tinggi-Serbelawan (STA 00+000 sd 30+000) termasuk  002/KONTRAK-HMW/VI/2018           355.102.364.000  PT Hutama Marga Waskita 29-Jun-18 29-Jun-20
Not Due Yet
Simpang Susun Serbelawan
Pekerjaan Pembangunan (design & build) Jalan Tol Tebing Tinggi-Parapat 
Belum Jatuh Tempo/
46 (Tahap 1) Ruas Tebing Tinggi-Serbelawan (STA 00+000 sd 30+000) termasuk  002/KONTRAK-HMW/VI/2018           349.225.979.000  PT Hutama Marga Waskita 29-Jun-18 29-Jun-20
Not Due Yet
Simpang Susun Serbelawan
Addendum Dalam
Kementerian Pekerjaan Umum dan 
47 Pekerjaan Arena Aquatic Papua HK.02.03/PPBLS/PPK.3/442           346.393.407.273  07-Des-18 28-Jul-20 Proses/ Addendum in
Perumahan Rakyat
Process
Addendum Dalam
01/KNT/LRTSS/VI/2016 dan Nomor : Kementerian Perhubungan/ The Ministry of
48 Pembangunan Light Rail Transit di Provinsi Sumatera Selatan (Zona I)           332.037.023.402  21-Okt-15 31-Mei-19 Proses/ Addendum in
01/WK-KEMENHUB.LRT/D.II/2016 Transportation
Process
Belum Jatuh Tempo/ 
49 Pekerjaan Terminal Bandara Internasional Minangkabau PJJ.14.10/00/09/2018/0790           330.866.780.000  PT Angkasa Pura II 17-Sep-18 09-Mar-20
Not Due Yet
Belum Jatuh Tempo/
50 Gedung Kampus UIII (Paket I) 5152/DJ.I/KS.01.7/11/2018           329.647.605.091  Kementrian Agama 29-Nov-18 21-Feb-20
Not Due Yet
Belum Jatuh Tempo/ 
51 Pekerjaan Bandara Depati Amir PJJ.14.10/00/11/2018/1028           284.614.862.000  PT Angkasa Pura II 08-Nov-18 08-Nov-19
Not Due Yet
Addendum Dalam
52 Paket 2 : Pengandaan Transmisi 500 KV Sumatera, Peranap - Perawang 0533.PJ/DAN.02.02/DIR/2015           243.963.348.873  PT Perusahaan Listrik Negara (Persero) 29-Okt-15 23-Mei-19 Proses/ Addendum in
Process
Addendum Dalam
Jalan Tol Terbanggi Besar- Pematang Panggang (Zona HK-4) Jembatan 
53 DU/AF.403.2/S.Perj.7.2/2019           191.599.664.288  PT Hutama Karya 16-Jun-17 30-Jun-19 Proses/ Addendum in
Sodong
Process
 

 
 

b.  Kontrak Konsesi Pengusahaan Jalan Tol b. Consession Toll Road Right Contract
 
Perusahaan/ Ruas Tol/ Mitra Kerja/ Isi Perjanjian/ Jangka Waktu/ Period
No
The Company Toll Section Partners Content of the Agreement Mulai/ Start Selesai/ Finish

1 PT Cimanggis Cibitung  Cimanggis - Cibitung Kementerian Pekerjaan Umum dan  Hak konsesi pengusahaan jalan tol selama 35  2016 2051


Tollways (CCT) Perumahan Rakyat/ The Ministry of  tahun/ Toll road concession rights for 35 
Public Works and Housing years
2 PT Trans Jabar Tol (TJT) Ciawi - Sukabumi Kementerian Pekerjaan Umum dan  Hak konsesi pengusahaan jalan tol selama 45  2015 2060
Perumahan Rakyat/ The Ministry of  tahun/ Toll road concession rights for 45 
Public Works and Housing years
3 PT Pemalang Batang Toll  Pemalang - Batang Kementerian Pekerjaan Umum dan  Hak konsesi pengusahaan jalan tol selama 40  2017 2057
Road (PBTR) Perumahan Rakyat/ The Ministry of  tahun/ Toll road concession rights for 40 
Public Works and Housing years
4 PT Sriwijaya Markmore  Kayu Agung -  Kementerian Pekerjaan Umum dan  Hak konsesi pengusahaan jalan tol selama 45  2017 2062
Persada (SRIMP) Palembang - Betung Perumahan Rakyat/ The Ministry of  tahun/ Toll road concession rights for 45 
Public Works and Housing years
5 PT Waskita Bumi Wira  Krian - Legundi -  Kementerian Pekerjaan Umum dan  Hak konsesi pengusahaan jalan tol selama 45  2016 2061
(WBW) Bunder - Manyar Perumahan Rakyat/ The Ministry of  tahun/ Toll road concession rights for 45 
Public Works and Housing years
6 PT Cibitung Tanjung Priok  Cibitung - Cilincing Kementerian Pekerjaan Umum dan  Hak konsesi pengusahaan jalan tol selama 40  2011 2051
(CTP) Perumahan Rakyat/ The Ministry of  tahun/ Toll road concession rights for 40 
Public Works and Housing years
7 PT PT Kresna Bekasi - Cawang - Kementerian Pekerjaan Umum dan  Hak konsesi pengusahaan jalan tol selama 40  2011 2056
Kusuma Kp Melayu Perumahan Rakyat/ The Ministry of  tahun/ Toll road concession rights for 40 
Dy andra Public Works and Housing years
Marga (KKDM)
8 PT Tol Teluk Balikpapan Penajam - Balikpapan Kementerian Pekerjaan Umum dan  Hak konsesi pengusahaan jalan tol selama 40  2011 2051
Perumahan Rakyat/ The Ministry of  tahun/ Toll road concession rights for 40 
Public Works and Housing years

220
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
c. Kontrak Lain-lain   c. Others Contract

Reksa Dana Penyertaan Terbatas (RDPT)   Reksa Dana Penyertaan Terbatas (RDPT)
   
Berdasarkan  Akta  notaris  No.  23  tanggal  10  April  Based on Notarial deed No. 23 dated April 10, 
2018  yang  disahkan  oleh  Kementerian  Hukum  dan  2018  endorsed  by  the  Minister  of  Law  and 
Hak  Asasi  Manusia  No.  AHU-AH.01.03-0141910  Human  Rights  No.  AHU-AH.01.03-0141910 
menyatakan  bahwa  WTR  telah  mengalihkan  atau  states  that  WTR  has  transferred  or  sold  its 
menjual  kepemilikan sahamnya  di WTTR  sebanyak  ownership  in  WTTR  of  1,206,049  shares  with 
1.206.049  lembar  saham  dengan  nilai  nominal  par  value  of  Rp  1,206,049,000,000  which 
Rp  1.206.049.000.000  yang  mewakili  57,14%  dari  represents  57.14%  of  the  total  shares  issued 
total  saham  yang  telah  dikeluarkan  WTTR  kepada  by  WTTR  to  the  Limited  Ownership  Mutual 
Reksa  Dana  Penyertaan  Terbatas  (RDPT)  yang  Fund  (RDPT),  hereinafter  referred  to  as  
selanjutnya  diatasnamakan  PT  Bank  Mega  Tbk  PT  Bank  Mega  Tbk  as  Custodian  Bank  of 
selaku  Bank  Kustodian  dari  RDPT.  Dengan  RDPT.  Thus  the  share  of  WTR  ownership  in 
demikian  porsi  kepemilikan WTR  di WTTR  menjadi  WTTR becomes 42.86% 
42,86%.   
   
Berdasarkan  akta  notaris  No.  26  tanggal  11  April  Based on notarial deed No. 26 dated April 11, 
2018  mengenai  Perubahan  Peningkatan  Modal  2018  regarding  Amendments  to  Capital 
Ditempatkan/Disetor  yang  telah  disahkan  Upgrades  issued  by  the  Ministry  of  Law  and 
Kementerian  Hukum  dan  Hak  Asasi  Manusia  Human  Rights  No.  AHU-AH.01.03-0144385 
No.  AHU-AH.01.03-0144385  menerangkan  bahwa  states  that  WTR  through  letter  
WTR  melalui  surat  No.  568/WTR/DIR/2018  tanggal  No.  568/  WTR/DIR/2018  dated  April  11,  2018 
11  April  2018  menyatakan  tidak  mengambil  bagian  said that it does not take part in the proportion 
atas  saham  secara  proporsional  terkait  dengan  of  shares  related  to  the  issuance  of  new 
penerbitan  saham  baru  di  perseroan.  Sesuai  shares  in  the  Company.  In  accordance  with  
dengan  akta  tersebut  maka  terdapat  perubahan  the  deed  then  there is a  change  of  ownership 
kepemilikan  saham  WTR  yakni  menjadi  904.536  of  WTR  shares  into  904,536  shares  or 
lembar  saham  atau  setara  dengan  equivalent to Rp 904,536,000,000 or 29.99% 
Rp 904.536.000.000 atau sebesar 29,99%. 
 
56. MANAJEMEN RISIKO KEUANGAN   56. FINANCIAL RISKS MANAGEMENT 
 
Dalam  pengelolaan  keuangan,  Grup  telah  melakukan    In financial management, the Group has conducted 
analisa  risiko  terhadap  persaingan  dan  ketidakpastian  a  risk  analysis  on  competition  and  uncertainties 
yang  dapat  berpengaruh  pada  aset  keuangan  dan  that  could  affect  the  financial  assets  and  financial 
liabilitas keuangan sebagai berikut:   liabilities as follows: 
     
a. Klasifikasi Aset dan Liabilitas Keuangan    a.   Classification of Financial Assets and
Liabilities 
     
Perbedaan  nilai  wajar  dengan  nilai  tercatat  pada     The  difference  between  the  fair  value  and         
30  September  2019  dan  31  Desember  2018  tidak    the carrying value at September 30, 2019 and 
signifikan.  December 31, 2018 was not significant. 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Aset Keuangan - Pinjaman yang Financial Assets-
diberikan dan Piutang Loan and Receivables
Kas dan Setara Kas   3.496.054.056.402  10.845.678.217.201  Cash and Equivalents Cash
Investasi Jangka Pendek 8.448.200.000  8.448.200.000  Short-Term Investments
Piutang Usaha dan Retensi 9.386.730.319.748  5.102.055.774.804  Trade Receivable and Retension
Piutang Lain-lain 10.793.546.220.765  8.844.805.010.582  Other Receivables
Piutang Ventura Bersama 2.079.324.266.573  659.662.426.115  Joint Ventures Receivables
Tagihan Bruto kepada Pengguna Jasa 30.002.374.208.383  32.350.733.163.102  Gross Amount Due from Customers
Aset Keuangan atas Proyek Konsesi 352.944.150.220  394.751.454.649  Financial Assets from Concession Project
Aset Keuangan yang Dimiliki Hingga Jatuh Tempo Held to Maturity Financial Assets
Investasi Jangka Panjang Lainnya 360.506.923.000  347.822.000.000  Other Long-Term Investments

Jumlah 56.479.928.345.091 58.553.956.246.453 Total

221
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Liabiltas Keuangan - Financial Liabilities-
Biaya perolehan diamortisasi Amortized cost
Utang Usaha 12.912.997.224.235  14.905.832.998.966  Accounts Payables
Utang Bruto Subkontraktor  1.424.477.398.203  2.225.140.670.799  Gross Amount Due to Third Parties
Utang Bank 65.539.106.957.225  48.711.501.155.353  Bank Loan
Utang Lembaga Keuangan Non-Bank 864.257.903.380  554.403.429.023  Loan to Financial Institution Non-Bank 
Biaya yang Masih Harus Dibayar 755.869.338.569  695.785.978.311  Accrued Expenses
Utang Lain-lain - Jangka Panjang 2.426.489.625.354  1.549.134.705.578  Other Payables - Long Term
Jumlah 83.923.198.446.966 68.641.798.938.030 Total

b. Tujuan dan Kebijakan Manajemen Risiko b. Financial Risk Management Objectives and
Keuangan Policies
 
Bisnis  Grup  mencakup  aktivitas  pengambilan  risiko    The  Group's  business  includes  risk-taking 
dengan  sasaran  tertentu  dengan  pengelolaan  yang  activities  with  specific  objectives  with 
profesional.  Fungsi  utama  dari  manajemen  risiko  professional  management.  The  main  function 
Grup  adalah  untuk  mengidentifikasi  seluruh  risiko  of  the  Group's  risk  management  is  to  identify 
kunci,  mengukur  risiko-risiko  ini  dan  mengelola  all key risks, measure these risks and manage 
posisi  risiko.  Grup  secara  rutin  menelaah kebijakan  risk  positions.  The  Group  regularly  reviews 
dan  sistem  manajemen  risiko  untuk  menyesuaikan  policies  and  risk  management  system  to 
dengan  perubahan  di  pasar,  produk  dan  praktek  adjust  to  changes  in  markets,  products  and 
pasar terbaik.  best market practices. 
 
Grup  mendefinisikan  risiko  keuangan  sebagai    The  Group  defines  financial  risk  as          
kemungkinan  kerugian  atau  laba  yang  hilang,  yang  the possibility of  loss or lost profit, caused by 
disebabkan  oleh  faktor  internal  maupun  faktor  both  internal  and  external  factors  that 
eksternal  yang  berpotensi  negatif  terhadap  potentially  have  a  negative  impact  on  
pencapaian tujuan Grup.  the achievement of Group goals. 
     
Tujuan  Grup  dalam  mengelola  risiko  keuangan    The  purpose  of  the  Group  in  managing 
adalah  untuk  mencapai  keseimbangan  yang sesuai  financial  risks  is  to  achieve  an  appropriate 
antara  risiko  dan  tingkat  pengembalian  serta  balance  between  risk  and  returns  and 
meminimalisasi  potensi  efek  memburuknya  kinerja  minimize  potential  adverse  effects  of                      
keuangan Grup.  the Group's financial performance. 
     
Risiko keuangan utama yang dihadapi Grup adalah    The  main  financial  risks  facing  the  Group  are 
risiko  kredit,  risiko  suku  bunga,  risiko  likuiditas,  credit  risk,  interest  rate  risk,  liquidity  risk, 
risiko  nilai  tukar  mata  uang  asing  dan  risiko  foreign  currency  exchange  rates  and  the  risk 
perubahan  kebijakan  pemerintah,  kondisi  ekonomi  of  changes  in  government  policy,  socio-
dan sosial politik. Perhatian atas pengelolaan risiko  economic and political conditions. Attention to 
ini  telah  meningkat  secara  signifikan  dengan  risk  management  has  increased  significantly 
mempertimbangan  perubahan  dan  volatilitas  pasar  and  considered  changer  and  volatility  of 
keuangan di Indonesia dan internasional.  financial  markets  in  Indonesia  and 
internationally. 
     
(i) Risiko Kredit   (i) Credit Risk
 
Risiko  kredit  adalah  kerugian  yang  timbul  dari    Credit  risk  is  the  loss  arising  from 
pelanggan  yang  gagal  memenuhi  kewajiban  customers  who  fail  to  meet  their 
kontraktual mereka.  contractual obligations. 

Instrumen  keuangan  Grup  yang  mempunyai    The  Group's  financial  instruments  that 
potensi  atas  risiko  kredit  terdiri  dari  kas  dan  have  the  potential  for  credit  risk  consist of 
setara  kas,  piutang  usaha,  piutang  retensi,  cash  and  cash  equivalents,  accounts 
tagihan  bruto  dan  piutang  lain-lain.  Jumlah  receivable,  retention,  gross  amount  due 
eksposur risiko kredit maksimum sama dengan  from  customers  and  other  receivables. 
nilai  tercatat  atas  akun-akun  tersebut.  Rincian  Total  maximum  credit  risk  exposure  equal 
umur piutang usaha dapat dilihat pada Catatan  to  the  carrying  value  of  these  accounts. 
dalam  laporan  keuangan  konsolidasian.  Pada  The  aging  of  trade  receivables  can  be 
tanggal  30  September  2019  piutang  usaha  seen  on  notes  to  consolidated  financial 

222
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Grup  tidak  terkonsentrasi  pada  pelanggan  statements.  On  September  30,  2019 
tertentu.  accounts  receivable  of  the  Group  is  not 
concentrated on a particular customer. 
     
Grup  mengelola  risiko  kredit  dengan    The  Group  manages  credit  risk  by  setting 
menetapkan  batasan  jumlah  risiko  yang  dapat  limits of  acceptable risk  for each customer 
diterima  untuk  masing-masing  pelanggan  dan  and  be  more  selective  in  the  choice  of 
lebih  selektif  dalam  pemilihan  bank  dan  institusi  banks  and  financial  institutions,  that  is, 
keuangan,  yaitu  hanya  bank-bank  dan  institusi  only  banks  and  financial  institutions  are 
keuangan  ternama  dan  yang  berpredikat  baik  predicated famous and well chosen. 
yang dipilih. 
     
(ii) Risiko Suku Bunga   (ii) Interest Rate Risk
 
Risiko  tingkat  bunga  arus  kas  adalah  risiko    Cash  flow  interest  rate  risk  is  the  risk  that 
dimana  arus  kas  masa  depan  dari  suatu  future  cash  flows  of  a  financial  instrument 
instrumen  keuangan  berfluktuasi  karena  fluctuate due to changes in market interest 
perubahan  suku  bunga  pasar.  Grup  memiliki  rates. The Group has short-term loans with 
pinjaman  jangka  pendek  dengan  bunga  floating  interest.  The  interest  rate  that  are 
mengambang.  Tingkat  suku  bunga  yang  cukup  quite  high  and  occurs  suddenly  can  effect 
tinggi  dan  terjadi  secara  tiba-tiba  dapat  the decline in the Group’s income. 
berpengaruh terhadap menurunnya laba Grup. 
     
Berikut  ini  merupakan  rincian  dari  liabilitas    The  following  is  a  breakdown  of  financial 
keuangan  berdasarkan  jenis  tingkat  suku  liabilities based on the type of interest rate: 
bunga: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Liabilitas Keuangan Financial Liabilities
Suku bunga mengambang 35.465.235.284.886  27.959.247.278.215  Floating Interest Rate
 
Analisis sensitivitas suku bunga    Interest rate sensitivity analysis 
     
Analisis  sensitivitas  di  bawah  ini  telah    The  sensitivity  analysis  below  have  been 
ditentukan  berdasarkan  eksposur  suku  bunga  determined  based  on  the  exposure  to 
untuk  kedua  instrumen  derivatif  dan  non-  interest rates for both derivatives and non-
derivatif  pada  akhir  periode  pelaporan.  Untuk  derivative  instruments  at  the  end  of   
liabilitas  tingkat  bunga  mengambang,  analisis  the  reporting  period.  For  floating  rate 
tersebut  disusun  dengan  asumsi  jumlah  liabilities,  the  analysis  is  prepared 
liabilitas  terutang  pada akhir  periode  pelaporan  assuming  the  amount  of  the  payable 
itu  terutang  sepanjang  tahun.  Kenaikan  atau  liability  at  the  end  of  the  reporting  period 
penurunan  0,5  basis  poin  digunakan  ketika  will  remain for  the whole year. A 0.5 basis 
melaporkan  risiko  suku  bunga  secara  internal  point  increase  or  decrease  is  used  when 
kepada  karyawan  kunci  dan  merupakan  reporting  interest  rate  risk  internally  to key 
penilaian manajemen terhadap perubahan yang  management  personnel  and  represents 
mungkin terjadi pada suku bunga.  management's  assessment  of  
the reasonably possible change in interest 
rates. 
 
Jika  suku  bunga  lebih  tinggi/rendah  50          If  interest  rates  had  been  50  basis  points 
basis  poin  dan  semua  variabel  lainnya   higher/lower  and  all  other  variables  
tetap  konstan,  laba  pada  tanggal  30  September  were held constant, profit as of September 
2019  dan  31  Desember  2018  akan  turun/naik  30,  2019  and  December  31,  2018  would 
masing-masing  sebesar  Rp  406.455.096.709  decrease/increase  by  Rp  406,455,096,709 
dan  Rp  322.728.426.040.  Hal  ini  terutama  and  Rp  322,728,426,040,  respectively. 
disebabkan  oleh  eksposur  Grup  terhadap  suku  This  is  mainly  attributable  to  the  Group’s 
bunga  atas  pinjamannya  dengan  suku  bunga  exposure  to  interest  rates  on  its  floating 
mengambang.  rate borrowings. 
 
 
 

223
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
(iii) Risiko Likuiditas   (iii) Liquidity Risk
 
Risiko  likuiditas  adalah  risiko  di  mana  posisi    Liquidity  risk  is  the  risk  in  which               
arus  kas  menunjukkan  pendapatan  jangka  the positions of cash flows show short-term 
pendek  tidak  cukup  untuk  menutupi  revenues  are  not  sufficient  to  cover  short- 
pengeluaran jangka pendek.   term expenses. 
 
Eksposur risiko likuiditas berupa kesulitan Grup    Liquidity  risk  is  an  exposure  of  the  Group 
dalam  memenuhi  kewajiban  keuangan  yang  difficulties  in  meeting  financial  obligations 
harus  dibayar  dengan  kas  atau  aset  keuangan  that  must  be  paid  with  cash  or  other 
lainnya.  Grup  diharapkan  dapat  membayar  financial  assets.  The  Group  is  expected  to 
seluruh  kewajibannya  sesuai  dengan  jatuh  pay  all  its  obligations  in  accordance  with 
tempo  kontraktual.  Dalam  memenuhi  liabilitas  contractual  maturities.  In  fulfilling  this 
tersebut,  maka  Grup  harus  menghasilkan  arus  obligation,  the  Group  must  generate 
kas masuk yang cukup.  sufficient cash inflows. 
     
Berikut  ini  merupakan  liabilitas  keuangan  non-   These are non-derivative financial liabilities 
derivatif  berdasarkan  nilai  sisa  jatuh  tempo  based  on  residual  maturity  value  which 
yang tidak didiskonto:  was not discounted: 
     
30 September/ September 30, 2019
Jatuh Tempo/ Due Date
< 1 Tahun/ >1-2 Tahun/ >2-3 Tahun/ >3 Tahun/ Jumlah/ Biaya Emisi/ Nilai Tercatat/
< 1 Year >1-2 Years >2-3 Years >3 Years Total Issuance Costs Carrying Amount
Rp Rp Rp Rp Rp Rp Rp

Utang Usaha 12.235.448.974.585  677.548.249.650  --  --  12.912.997.224.235  --  12.912.997.224.235  Accounts Payable


Liabilitas Jangka Pendek Lainnya 1.217.875.938.108  --  --  --  1.217.875.938.108  --  1.217.875.938.108  Other Short-Term Liabilities
Jumlah Liabilitas Keuangan 13.453.324.912.693 677.548.249.650 -- -- 14.130.873.162.343 -- 14.130.873.162.343 Total Financial Liabilities
 
 
31 Desember/ December 31, 2018
Jatuh Tempo/ Due Date
< 1 Tahun/ >1-2 Tahun/ >2-3 Tahun/ >3 Tahun/ Jumlah/ Biaya Emisi/ Nilai Tercatat/
< 1 Year >1-2 Years >2-3 Years >3 Years Total Issuance Costs Carrying Amount
Rp Rp Rp Rp Rp Rp Rp
Utang Usaha 14.119.798.348.256  786.034.650.710  --  --  14.905.832.998.966  --  14.905.832.998.966  Accounts Payable
Liabilitas Jangka Pendek Lainnya 825.239.033.758  --  --  --  825.239.033.758  --  825.239.033.758  Other Short-Term Liabilities
Jumlah Liabilitas Keuangan 14.945.037.382.014 786.034.650.710 -- -- 15.731.072.032.724 -- 15.731.072.032.724 Total Financial Liabilities
 
 
Grup  mengelola  risiko  likuiditas  dengan    The  Group  manages  liquidity  risk  by 
mempertahankan  kas  dan  setara  kas  yang  maintaining  cash  and  cash  equivalents 
mencukupi  dalam  memenuhi  komitmen  Grup  sufficient  to  meet  the  commitments  of      
untuk  operasi  normal  dan  secara  rutin  the  Group  for  normal  operation  and 
mengevaluasi  proyeksi  arus  kas  dan  arus  kas  regularly  evaluates  cash  flow  projections 
aktual,  serta  jadwal  tanggal  jatuh  tempo  aset  and  actual  cash  flows,  and  the  schedule 
dan Liabilitas keuangan.  date  of  maturity  of  assets  and  financial 
liabilities. 
 
(iv) Risiko Nilai Tukar Mata Uang Asing   (iv) Foreign Exchange Risk Foreign Currency 
     
Eksposur  risiko  nilai  tukar  mata  uang  asing    Risk  exposure  of  foreign  currency 
merupakan bagian dari kegiatan operasi normal  exchange rate is part of normal operations 
Perusahaan dan cabang Luar Negeri.  of the Company and the Foreign branches. 
     
Pengaruh  dari  selisih  nilai  tukar  mata  uang    The  effect  of  foreign  exchange  currency 
asing tidak signifikan.  differences is not significant. 
     
(v) Risiko Perubahan Kebijakan Pemerintah,   (v) Risk of Changes in Government Policy,
Kondisi Ekonomi dan Sosial Politik. Economic and Social Politics.
     
Kebijakan  pemerintah  baik  yang  menyangkut    Government  policies  concerning  economic 
ekonomi  dan  moneter,  serta  kondisi  sosial  dan  and  monetary,  and  social  and  political 
politik  yang  kurang  kondusif  akan  berakibat  conditions  that  are  less  conducive  will 
menurunnya  investasi  dan  pembangunan.  Hal  result  in  the  decreasing  of  investment  and 

224
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
ini  dapat  mengakibatkan  tertundanya  proyek- development.  This  can  lead  to  delays  in 
proyek  yang  telah  maupun  akan  diperoleh  projects that have been or will be acquired 
Grup.  by the Group. 
     
Risiko  ini  merupakan  risiko  yang  bersifat    This  risk  is  a  systemic  risk  whereby  if  this 
sistemik dimana bila risiko ini terjadi maka akan  happens then the risk will negatively affect 
mempengaruhi  secara  negatif  seluruh  variable  all  the  variables  involved,  this  make  
yang  terlibat,  sehingga  membuat  kinerja  Grup  the  performance  of  the  Group  decrease. 
menurun.  Diversifikasi  risiko  ini  pun  belum  Even  risk  diversification  is  not  able  to 
mampu menghilangkan risiko ini.  eliminate this risk. 
 
c. Manajemen Risiko Modal    c. Capital Risk Management Policy 
 
Tujuan  dari  Grup  dalam  mengelola  permodalan    The purpose of the Group in managing capital 
adalah  untuk  melindungi  kemampuan  Grup  dalam  is  to  protect  the  ability  of  the  Group  in 
mempertahankan  kelangsungan  usaha,  sehingga  maintaining  business  continuity,  so  the  Group 
Grup dapat tetap memberikan hasil  bagi pemegang  can  still  deliver  results  for  shareholders  and 
saham  dan  manfaat  bagi  pemangku  kepentingan  benefits for other stakeholders, and to provide 
lainnya,  dan  untuk  memberikan  imbal  hasil  yang  adequate  returns  to  shareholders  by  pricing 
memadai  kepada  pemegang  saham  dengan  products and services that are commensurate 
menentukan  harga  produk  dan  jasa  yang  sepadan  with the level of risk. 
dengan tingkat risiko. 
     
Grup  menetapkan  sejumlah  modal  sesuai  proporsi    The  Group  set  a  number  of  capital  in 
terhadap risiko.  Grup mengelola struktur modal dan  proportion to the risk. The Group manages its 
membuat  penyesuaian  dengan  memperhatikan  capital  structure  and  makes  adjustments 
perubahan  kondisi  ekonomi  dan  karakteristik  risiko  taking  into  account  changes  in  economic 
aset yang mendasari.  conditions  and  risk  characteristics  of   
the underlying asset. 
     
Konsisten  dengan  Perusahaan  lain  dalam  industri,    Consistent  with  other  companies  in          
Grup  memonitor  modal  dengan  dasar  rasio  utang  the  industry,  the  Group  monitors  capital  on        
terhadap modal yang disesuaikan. Rasio ini dihitung  the  basis  of  the  debt  ratio  of  to  adjusted 
sebagai  berikut:  utang  neto  dibagi  modal  yang  capital. This  ratio  is  calculated  as  follows:  net 
disesuaikan.  Utang  neto  merupakan  total  utang  debt  divided  by  adjusted  capital.  Net  debt  is 
(sebagaimana  jumlah  dalam  laporan  posisi  total  debt  (as  the  amount  in  the statement  of 
keuangan) dikurangi kas dan setara kas.  financial  position)  minus  cash  and  cash 
equivalents. 
     
Strategi  Grup  untuk  mempertahankan  rasio  utang    The  Group's  strategy  is  to  maintain  ratio  of  
terhadap modal yang disesuaikan pada batas bawah  the  debt  to  adjusted  capital  at  the  lower  limit 
dari  kisaran  2  Rasio  utang  terhadap  modal  yang  with  the  range  of  2  Debt  to  capital  ratio  as  of 
disesuaikan  pada  30  September  2019  dan   September 30, 2019  and  December  31,  2018 
31 Desember 2018 adalah sebagai berikut:  are as follows: 
     
30 September/ 31 Desember/
September 30, 2019 December 31, 2018
Rp Rp
Liabilitas Keuangan Financial Liabilities
Suku bunga mengambang 35.465.235.284.886  27.959.247.278.215  Floating Interest Rate

Total Liabilitas 108.013.366.034.037  95.504.462.872.769  Total Liabilities


Dikurang: Kas dan Setara Kas 3.496.054.056.402  10.845.678.217.201  Deduct: Cash and Cash Equivalents
Liabilitas Bersih 104.517.311.977.635 84.658.784.655.568 Net Liabilities
Total Ekuitas 29.226.593.980.323 28.887.118.750.867 Total Equity

Rasio Utang terhadap Modal                               3,58                               2,93 Net Debt to Equity Ratio


 
 
 
 
 
 
 
 

225
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
57. KOMITMEN DAN KONTIJENSI   57. COMMITMENT AND CONTINGENCY  
 
Perusahaan    The Company 
 
Berdasarkan akta notaris Euis Budiarti Afandi, Sarjana  Based  on  notarial  deed  of  Euis  Budiarti  Afandi, 
Hukum,  Spesialis  Notaris  No.  02/WASKITA- Bachelor  of  Law,  Notary  Specialist  
ACSET/KSO/2017,  tanggal  19  Januari  2017  telah  No.  02/WASKITA-ACSET/KSO/2017,  dated 
dibentuk  Kerjasama  Operasi  (KSO)  antara  January  19,  2017  has  been  established  Joint 
Perusahaan  dengan  PT.  Acset  Indonusa  Tbk  dengan  Operation  (JO)  between  the  Company  with  
nama  Waskita  –  Acset  KSO  untuk  pelaksanaan  PT.  Acset  Indonusa  Tbk  under  the  name  of  JO 
pekerjaan  pembangunan  Jalan  Tol  Jakarta  Cikampek  Waskita  -  Acset  for  the  engagement  of  Jakarta 
II  Elevated  ruas  Cikunir  s.d  Karawang  Barat   Cikampek  II  Toll  Road  Elevated  Cikunir  to  West 
 
(sta 9+500 s.d sta 47+500).     
Karawang (sta 9 + 500 s.d sta 47 + 500). 
   
Perusahaan  mempunyai  porsi  yang  dikerjakan  secara  The  Company  has  a  portion  of  joint  operation  for 
porsi  untuk pelaksanaan  pekerjaan  pembangunan   the  engagement  of  the  construction  work  of 
Jalan Tol Jakarta Cikampek II Elevated ruas Cikunir s.d  Jakarta Cikampek II Toll Road Elevated Cikunir to 
Karawang  Barat  sta  9+500  -  sta  28+480  berdasarkan  West Karawang sta 9 + 500 - sta 28 + 480 based 
perjanjian  kerja  sama  operasi  (KSO)   on  cooperation  agreement  (KSO)  
No:  01/WASKITA-ACSET/JOA/2017.  Sisa  pekerjaan   No:  01/WASKITA-ACSET/JOA/2017.  The  rest  of       
pembangunan  Jalan Tol Jakarta Cikampek II Elevated  the  construction  work  of  the  Jakarta  Cikampek  II 
ruas  Cikunir  s.d  Karawang  Barat  (sta  9+500  s.d   Toll  Road  Elevated  Cikunir  to  West  Karawang 
sta  47+500)  dilaksanakan  secara  ventura  bersama  segment (sta 9 + 500 s.d sta 47 + 500) is worked 
(Catatan 13).  by joint venture (Note 13) 
     
Entitas Anak dari PT Waskita Karya Infrastruktur   Subsidiary of PT Waskita Karya Infrastruktur
(WKI), PT Waskita Sangir Energy (WSE)  (WKI), PT Waskita Sangir Energy (WSE) 
 
WSE  menandatangani  Power  Purchase  Agreement    WSE  entered  into  Power  Purchase  Agreement 
(PPA)  pada  tanggal  23 Maret  2015  dengan  PLN.  (PPA)  on  March  23,  2015  with  PLN.  Under  
Berdasarkan  ketentuan  PPA,  PLN  telah  berkomitmen  the  terms  of  the  PPA,  PLN  has  committed  to 
untuk  membeli  kapasitas  pembangkit  listrik  WSE  dan  purchase  the  available  capacity  of      the  WSE’s 
seluruh  hasil  listrik  selama  dua  puluh  tahun  sampai  power stations and all generated of electricity for a 
2036.  period of twenty years until 2036. 
     
WSE telah membangun, memiliki dan mengoperasikan    WSE  has  build,  owned  and  operated  the  plant 
fasilitas  pabrik  yang  berlokasi  di  Solok  Selatan,  facilities  at  site  which  is  located  at  South  Solok, 
Sumatera Barat.  West Sumatera. 
     
Setelah  beroperasi  secara  komersial  dalam  proyek,    Upon commercial operation of the Project, WSE is 
WSE berkewajiban menyediakan kepada PLN keluaran  obligated  to  make  available  to  PLN  the  net 
listrik bersih  dari  fasilitas  proyek,  yang  akan  dibeli  oleh  electrical  output  of  the  project's  plant  facilities, 
PLN pada jumlah yang ditentukan berdasarkan formula  which  will  be  purchased  by  PLN  at  amounts 
yang  tercantum  dalam  PJBL.  Jumlah  yang  harus  determined  under  formula  set  forth  in  the  PJBL. 
dibayar  oleh  PLN  adalah  jumlah  keluaran  listrik  bersih  The  amount  to  be  paid  by  PLN  is  the  amount  of 
yang  dihasilkan.  Jangka  waktu  PPA  dimulai  pada  net  electrical  output  produced.  The  term  of  the 
tanggal  9  Desember  2016  dan  akan  berakhir  pada  PPA  commenced  on  December  9,  2016  and  will 
tanggal  9  Desember  2036,  kecuali  diakhiri  lebih  awal  expire  on  December  9,  2036,  unless  terminated 
sesuai  dengan  ketentuan  PPA,  sebagaimana  telah  earlier  in  accordance  with  the  terms  of  the  PPA, 
diubah.  as amended. 
     
Seluruh pihak sepakat harga energi listrik terukur pada    All  parties  agreed  electricity  price  estimated  on 
titik transaksi, yaitu:  transaction points as stated: 
i.  Rp  1.182,50  per  kWh  untuk  tahun  ke-1  sampai    i.  Rp 1,182.50 per kWh for year-1 through year-8 
dengan  tahun  ke-8  sejak  tanggal  operasi  komersial  since the date of plant’s commercial operation; 
pembangkit; dan  and 
ii.  Rp  825  per  kWh  untuk  tahun  ke-9  sampai  dengan    ii.  Rp  825  per  kWh  for  year-9  through  year-20 
tahun  ke-20  sejak  tanggal  operasi  komersial  since the date of plant’s commercial operation. 
pembangkit. 
 
PLN memiliki opsi untuk membeli hak, kepemilikan, dan    PLN  has  an  option  to  purchase  the  WSE's  right, 
kepentingan WSE dalam proyek dengan nilai terminasi  title  and  interest  in  the  project  for  a  termination 
berdasarkan  formula  tertentu  yang  tercantum  dalam  value  based  on  a  certain  formula  set  forth  in      
PPA.  Harga  beli  yang  harus  dibayar  oleh  PLN,  dalam  the  PPA.  The  purchase  price  to  be  paid  by  PLN, 
hal  PLN  melakukan  opsi  pembelian,  mengalami  in  case  PLN  exercises  the  purchase  option, 
penurunan seiring menjelang berakhirnya PPA.  decreases as the end of the PPA approaches. 

226
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada  tanggal  1  Juni  2016,  WSE  dan  PLN    On  June  1,  2016,  WSE  and  PLN  entered  into    
menandatangani  amandemen  PPA  terkait  kewajiban  the  amendment  to  the  PPA  regarding  obligation 
dan  tanggungjawab  para  pihak,  pembangunan  and responsibilities of both parties, construction of 
pembangkit  dan  pembayaran  yang  diizinkan  power  plants  and  payment,  which  is  allowed 
berdasarkan PPA awal, jika disetujui kedua belah pihak.  under the original PPA, if agreed by both parties. 
Di  bawah  PPA,  kedua  belah  pihak  sepakat  untuk  Under  the  PPA,  both  parties  agreed  to  amend 
mengubah hal-hal tertentu dari PPA awal.  certain matters of the original PPA. 
 
Entitas Anak, PT Waskita Karya Realty (WKR)    Subsidiary, PT Waskita Karya Realty (WKR) 
 
Dalam  rangka  melakukan  kegiatan  usaha,  WKR    In  connection  with  its  operations,  WKR  entered 
memiliki  perjanjian-perjanjian  penting.  Perjanjian  dan  into  significant  agreements.  The  significant 
ikatan  penting  yang  masih  berlaku  sampai  dengan  agreements  and  commitments  applied  until 
tanggal 30 September 2019 adalah sebagai berikut:  September 30, 2019 are as follows: 
     
Perjanjian dengan PT Waskita Karya (Persero) Tbk Agreement with PT Waskita Karya (Persero)
Tbk

Pada  tanggal  8  September  2016,  WKR  On  September  8,  2016,  WKR  entered  into 
menandatangani  perjanjian  No.  01/SPPP/  agreement  No.  01/SPPP/KONTRAKTOR/WKR/ 
KONTRAKTOR/WKR/IX/2016  dengan  PT  Waskita  IX/2016  with  PT  Waskita  Karya  (Persero)  
Karya  (Persero)  Tbk  terkait  dengan  jasa  konstruksi  Tbk  related  to  construction  service  for  
atas  pembangunan  proyek  The  Reiz  Condo  yang  the  development  The  Reiz  Condo  in  Medan  with 
berlokasi  di  Medan  dengan  total  nilai  perjanjian  total  contract  amount  of  Rp  489,915,000,000. 
sebesar  Rp  489.915.000.000.  Masa  pelaksanaan  The  period  of  contract  is  938  days  from  the  date 
pekerjaan  atas  kontrak  adalah  938  hari  sejak  tanggal  of  contract  with  maintenance  period  of  365 
kontrak  perjanjian  dengan  masa  pemeliharaan  365  working days from completion date.
hari kerja sejak serah terima pekerjaan selesai.

Perjanjian dengan KSO Waskita Triniti Agreement with KSO Waskita Triniti

Pada  tanggal  15  Nopember  2016,  Perusahaan  On  November  15,  2016,  the  Company  entered 
menandatangani  perjanjian  perikatan  into  agreement  No.  001/KB/WKR-KSO/XI/2016 
No.  001/KB/WKR-KSO/XI/2016  dengan  KSO  Waskita  with KSO Waskita Triniti related to the acquisition 
Triniti  terkait  pembelian  lima  unit  ruang  kantor  unit  of  five  units’  office  space  unit  Brooklyn  
Brooklyn  milik  KSO  Waskita  Triniti  dengan  nilai  from  KSO  Waskita  Triniti  amounted  to  
perikatan  sebesar  Rp  20.816.327.272.  Jatuh  tempo  Rp  20,816,327,272.  The  maturity  date  of  debt  is 
pinjaman ini sampai dengan 28 Desember 2019 yang  on  December  28,  2019  with  installment  payment 
pembayarannya dilakukan secara bertahap. method.

Perjanjian dengan PT Dafam Hotel Management Agreement with PT Dafam Hotel Management
     
Pada  tanggal  24  Maret  2016,  WKR  menandatangani    Based on the Deed No. 2 dated March 24, 2016, 
perjanjian No. 2 dengan PT Dafam Hotel Management  WKR  entered  into  management  agreement  with 
(Operator).  Berdasarkan  perjanjian  tersebut,  PT Dafam  Hotel  Management  (the  Operator). 
PT Dafam  Hotel  Management  bertanggungjawab  Based  on  the  agreement,  PT  Dafam  Hotel 
sebagai  operator  atas  Hotel  Dafam  Teraskita  milik        Management  is  responsible  as  the  operator  of 
WKR.  Hotel Dafam Teraskita owned by WKR. 
     
Jangka  waktu  perjanjian  adalah  10  (sepuluh)  tahun    The  period  of  the  agreement  is  10  (ten)  years 
sejak  ditandatanganinya  perjanjian  dan  dapat  since the signing date of this agreement and could 
diperpanjang  jika  disetujui  oleh  kedua  belah  pihak  be renewed if agreed upon by both parties at least 
paling  lambat  90  hari  kerja  sebelum  tanggal  90 working days before the expiration date. 
berakhirnya. 
     
Berdasarkan perjanjian tersebut, para pihak menyetujui    Based  on  those  agreements,  all  parties  agreed 
bahwa PT Dafam Hotel Management sebagai Operator  that  PT  Dafam  Hotel  Management  as  Operator 
berhak menerima:  entitled to receive: 
     
1.  Technical  Assistant  Fee  sebesar  Rp  600.000.000    1.  Technical  Assistant  Fee  amounted  to  
yang dibayarkan pada tanggal 26 Mei 2015.  Rp  600,000,000  which  has  been  paid  on 
May 26, 2015. 
     

227
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
2.  Base  fee  sebesar  2%  pada  tahun  pertama  dan    2.  Base fee of 2% for the first year and 2,5% for 
2,5%  di  tahun-tahun  berikutnya  dari  Total  following  years  from  of  Total  Operating 
Pendapatan Operasional.  Revenue. 
     
3.  Incentive Fee berdasarkan tinggi rendahnya Gross    3.  Incentive Fee based on high and low of Gross 
Operating Profit (GOP) :  Operating Profit (“GOP”) : 
 
a.  0%  dari  GOP  apabila  GOP  kurang  dari  35%    a.  0%  of  GOP  if  GOP  is  less  than  35%  of 
dari Pendapatan Hotel Total;  Total Revenue Hotel; 
b.  5% dari GOP apabila GOP lebih dari 35% dan  b.  5% of  GOP if GOP is more than 35% and 
kurang  dari  atau  sama  dengan  45%  dari  less  than  or  equivalent  with  45%  of  Total 
Pendapatan Hotel Total; dan  Revenue Hotel;  
c.  7% dari GOP apabila GOP lebih dari 45% dari  c.  7%  of  GOP  if  GOP  is  more  than  45%  of 
Pendapatan Hotel Total.  Total Revenue Hotel. 
 
4.  Sales  and  marketing  fee  adalah  1%  dari    4.  Sales  and  marketing  fee  are  1%  of  the  gross 
pendapatan kotor kamar per bulan.  revenue room per month. 
     
Perjanjian Kerja Sama Operasi (KSO) dengan   Joint Venture agreement with PT Asiana
PT Asiana Senopati Senopati
 
Pada  tanggal  25  Juni  2015,  WKR  menandatangani    On June 25, 2015, WKR entered into joint venture 
kontrak  perjanjian  KSO  No.  40  dengan  PT  Asiana  agreement  No.  40  with  PT  Asiana  Senopati  in 
Senopati  dalam  rangka  pengembangan  tanah  seluas  order  to  develop  5,453sqm  land  areas  at  Jalan 
5.453m2  yang  terletak  di  Jalan  Senopati  Dalam  Senopati  Dalam  RT  02/RW  03,  Senayan, 
RT 02/RW  03,  Kelurahan  Senayan,  Kecamatan  Kebayoran  Baru.  The  agreement  ends  when  
Kebayoran  Baru.  Perjanjian  ini  berakhir  apabila  the  execution  of  the  joint  venture’s  project  work 
pelaksanaan  pekerjaan  proyek  KSO  telah  selesai  has  been  complete,  demonstrated  with               
dengan  dibuktikannya  telah  habisnya  masa  the  expiration  of  the  maintenance  work  of      
pemeliharaan  pekerjaan  kontraktor  dan  KSO,  serta  the  contractor  and  joint  venture,  as  well  as  all 
seluruh  hak  dan  kewajiban  antara  KSO  dengan  rights  and  obligations  between  the  joint  venture 
pembeli, pihak ketiga, Instansi Pemerintah yang terkait  and  a  buyer,  a  third  party,  government  agencies 
dan  berwenang  dalam  rangka  pelaksanaan  dan  involved  and  is  competent  in  the  implementation 
penyelesaian  KSO  telah  terpenuhi  semuanya  tanpa  and  completion  of  the  joint  venture  has  been 
menimbulkan tunggakan kewajiban.  fulfilled without causing arrears of obligations . 
     
Komposisi  penyertaan  saham  terdiri  dari WKR  sebesar    The  composition  of  shareholders  consists  of  
51%  dan  PT  Asiana  Senopati  sebesar  49%,  dengan  WKR  at  51%  and  PT Asiana  Senopati  at  49%, 
modal awal sebesar  Rp 603.345.343.137.  with an initial capital of Rp 603,345,343,137. 
     
Perjanjian KSO dengan PT Sirius Terang Cemerlang Joint Venture Agreement with PT Sirius Terang
Cemerlang
 
Pada  tanggal  26  Mei  2015,  WKR  menandatangani    As  of  May  26,  2015,  WKR  entered  into  joint 
kontrak  perjanjian  KSO  No.  166  dengan  PT  Perintis  venture agreement No. 166 with PT Perintis Triniti 
Triniti  Properti  dan  PT  Perintis  Trusmi  Properti  dalam  Properti  and  PT  Perintis  Trusmi  Properti  in  order 
rangka  pengembangan  tanah  seluas  5.000m2  yang  to  develop  5,000sqm  land  areas  at  Jalan  
terletak  di  Jalan  Sutera  Boulevard,  Alam  Sutera,  Sutera  Boulevard,  Alam  Sutera,  Tangerang.     
Tangerang.  Perjanjian  ini  berakhir  apabila  pelaksanaan  The  agreement  ends  when  the  execution  of  
pekerjaan  proyek  KSO  telah  selesai  dengan  the  joint  venture’s  project  work  has  been 
dibuktikannya  telah  habisnya  masa  pemeliharaan  completed  demonstrated  with  the  expiration  of  
pekerjaan  kontraktor  dan  KSO,  serta  seluruh  hak  dan  the  maintenance  work  of  the  contractor  and  joint 
kewajiban  antara  KSO  dengan  pembeli,  pihak  ketiga,  venture,  as  well  as  all  rights  and  obligations 
Instansi  Pemerintah  yang  terkait  dan  berwenang  dalam  between  the  joint  venture  and  a  buyer,  a  third 
rangka  pelaksanaan  dan  penyelesaian  KSO  telah  party,  government  agencies  involved  and  is 
terpenuhi  semuanya  tanpa  menimbulkan  tunggakan  competent  in  the  implementation  and  completion 
kewajiban.  of  the  joint  venture  has  been  fulfilled  without 
causing arrears of obligations. 
     
Komposisi penyertaan saham terdiri dari WKR sebesar    The  composition  of  shareholders  consists  of  
40,8%,  PT  Perintis  Triniti  Properti  sebesar  39,2%,  dan  WKR  at  40.8%,  PT  Perintis  Properti  Triniti  at 
PT Perintis Trusmi Properti sebesar 20% dengan modal  39.2%,  and  PT  Perintis  Trusmi  Properti  at  20% 
awal sebesar Rp 125.000.000.000.   with an initial capital of Rp 125,000,000,000. 
     

228
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Pada  tanggal  30  Oktober  2015,  terdapat  pembaharuan    In  October  30,  2015,  there  is  a  renewal  of          
perjanjian  KSO  Waskita  Triniti  II.  Disepakati  bahwa  the  KSO  Waskita  Triniti  II  agreement.  It  was 
posisi  PT  Perintis  Triniti  Properti  digantikan  oleh  agreed that the position PT Perintis Triniti Properti 
PT Sirius  Terang  Cemerlang.  Seluruh  hak  dan  is  replaced  by  PT  Sirius  Terang  Cemerlang.  All 
kewajiban  PT  Perintis  Triniti  Properti  dialihkan  kepada  rights and obligations of PT Perintis Triniti Properti 
PT Sirius Terang Cemerlang.  is transferred to PT Sirius Terang Cemerlang. 
 
Berdasarkan  Akta  No.  9  tanggal  3  Oktober  2016,    Based on the Deed No. 9 dated October 3, 2016, 
terdapat  perubahan  perjanjian  KSO  Waskita  Triniti  II  there  is  a  change  of  the  KSO  Waskita  Triniti  II 
yang  berisi  komposisi  penyertaan  saham  yang  baru,  agreement  which  contains  the  composition  of 
yaitu  WKR  sebesar  50,8%  atau  senilai  investments  in  new  shares,  namely  WKR  of 
Rp 69.646.800.000  dan  PT  Sirius  Terang  Cemerlang  50.8%  or  equivalent  to  Rp  69,646,800,000  and  
sebesar 49,2% atau senilai Rp 67.453.200.000.  PT  Sirius  Terang  Cemerlang  by  49.2%  or 
equivalent to Rp 67,453,200,000. 
 
Perjanjian KSO dengan PT Darmo Permai   Joint Venture Agreement with PT Darmo
Permai
 
Pada  tanggal  21  Mei  2014,  WKR  menandatangani    As  of  May  21,  2014,  WKR  entered  into  KSO 
kontrak  perjanjian  KSO  No.  6  dengan  PT  Darmo  agreement  No.  6  with  PT  Darmo  Permai  in  order 
Permai  dalam  rangka  pengembangan  tanah  seluas  to develop 34,089sqm land areas at Segi 8 Darmo 
34.089m2  yang  terletak  di  Segi  8  Darmo  Jalan  Raya  Jalan  Raya  Darmo  Permai  III,  Surabaya  Barat. 
Darmo  Permai  III,  Surabaya  Barat.  Perjanjian  ini  The  agreement  ends  when  the  execution  of  
berakhir  apabila  pelaksanaan  pekerjaan  proyek  KSO  the  joint  venture’s  project  work  has  been 
telah  selesai  dengan  dibuktikannya  telah  habisnya  completed  demonstrated  with  the  expiration  of   
masa  pemeliharaan  pekerjaan  kontraktor  dan  KSO,  the  maintenance  work  of  the  contractor  and  joint 
serta  seluruh  hak  dan  kewajiban  antara  KSO  dengan  venture,  as  well  as  all  rights  and  obligations 
pembeli,  pihak  ketiga,  Instansi  Pemerintah  yang  terkait  between  the  joint  venture  and  a  buyer,  a  third 
dan  berwenang  dalam  rangka  pelaksanaan  dan  party,  government  agencies  involved  and  is 
penyelesaian  KSO  telah  terpenuhi  semuanya  tanpa  competent  in  the  implementation  and  completion 
menimbulkan tunggakan kewajiban.  of  the  joint  venture  has  been  fulfilled  without 
causing arrears of obligations. 
     
Komposisi penyertaan saham terdiri dari WKR sebesar    The  composition  of  shareholders  consists  of  
51%,  PT  Darmo  Permai  sebesar  49%  dengan  modal  WKR  at  51%,  PT  Darmo  Permai  at  49%  with  an 
awal sebesar Rp 426.112.500.000.  initial capital of Rp 426,112,500,000. 
     
Perjanjian KSO dengan PT Dalawa Paralia Lepang    Joint Venture Agreement with PT Dalawa
Paralia Lepang
 
Pada  tanggal  5  Mei  2015,  WKR  menandatangani    As  of  May  5,  2015,  WKR  entered  into  KSO 
kontrak  perjanjian  KSO  No.  2  dengan  PT  Dalawa  agreement No. 2 with PT Dalawa  Paralia Lepang 
Paralia  Lepang  dalam  rangka  pengembangan  tanah  in  order  to  develop  29,020  sqm  land  areas  at 
seluas  29.020m2  yang  terletak  di  Kelurahan  Gelgel,  Kelurahan  Gelgel,  Kabupaten  Klungkung,  Bali.   
Kabupaten  Klungkung,  Bali.  Perjanjian  ini  berakhir  The  agreement  ends  when  the  execution  of  
apabila  pelaksanaan  pekerjaan  proyek  KSO  telah  the  joint  venture’s  project  work  has  been 
selesai  dengan  dibuktikannya  telah  habisnya  masa  completed,  demonstrated  with  the  expiration  of              
pemeliharaan  pekerjaan  kontraktor  dan  KSO,  serta  the  maintenance  work  of  the  contractor  and  joint 
seluruh hak dan kewajiban antara KSO dengan pembeli,  venture,  as  well  as  all  rights  and  obligations 
pihak  ketiga,  Instansi  Pemerintah  yang  terkait  dan  between  the  joint  venture  and  a  buyer,  a  third 
berwenang  dalam  rangka  pelaksanaan  dan  party,  government  agencies  involved  and  is 
penyelesaian  KSO  telah  terpenuhi  semuanya  tanpa  competent  in  the  implementation  and  completion 
menimbulkan tunggakan kewajiban.  of  the  joint  venture  has  been  fulfilled  without 
causing arrears of obligations. 
 
Perjanjian KSO dengan PT Graha Jasa Ekatama   Joint Venture Agreement with PT Graha Jasa
  Ekatama

Pada  tanggal  6  Juni  2016,  WKR  menandatangani    As  of  June  6,  2016,  WKR  entered  into  KSO 
kontrak perjanjian KSO No. 17 dengan PT Graha Jasa  agreement  No.  17  with  PT  Graha  Jasa  Ekatama 
Ekatama  dalam  rangka  pengembangan  tanah  seluas  in  order  to  develop  11,090sqm  at  Pejaten  Barat, 
11.090m2 di  Pejaten  Barat, Jakarta  Selatan.  Perjanjian  Jakarta  Selatan.  The  agreement  ends  when  
ini berakhir apabila pelaksanaan pekerjaan proyek KSO  the  execution  of  the  joint  venture’s  project  work 

229
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
telah  selesai  dengan  dibuktikannya  telah  habisnya  has  been  completed  demonstrated  with     
masa  pemeliharaan  pekerjaan  kontraktor  dan  KSO,  the  expiration  of  the  maintenance  work  of         
serta  seluruh  hak  dan  kewajiban  antara  KSO  dengan  the  contractor  and  joint  venture,  as  well  as  all 
pembeli, pihak ketiga, Instansi  Pemerintah yang terkait  rights  and  obligations  between  the  joint  venture 
dan  berwenang  dalam  rangka  pelaksanaan  dan  and  a  buyer,  a  third  party,  government  agencies 
penyelesaian  KSO  telah  terpenuhi  semuanya  tanpa  involved  and  is  competent  in  the  implementation 
menimbulkan  tunggakan  kewajiban.  Komposisi  and  completion  of  the  joint  venture  has  been 
penyertaan  saham  di  dalam  KSO  Waskita  Ekatama  fulfilled  without  causing  arrears  of  obligations.  
terdiri dari WKR sebesar 60%, PT Graha Jasa Ekatama  The composition of the shareholder in the Waskita 
sebesar  40%  dengan  modal  awal  sebesar  Ekatama  joint  venture  consists  of  
Rp 331.000.000.000.  WKR  at  60%,  PT  Graha  Jasa  Ekatama  at  40% 
with initial capital of Rp 331,000,000,000. 
     
Perjanjian KSO dengan PT Rajawali Nusantara   Joint Venture Agreement with PT Rajawali
Indonesia Nusantara Indonesia
 
Pada tanggal 10 Oktober 2016, WKR menandatangani    As  of  October  10,  2016,  WKR  entered  into  KSO 
kontrak  perjanjian  KSO  No.  2079  dengan  PT  Rajawali  agreement  No.  2079  with  PT Rajawali  Nusantara 
Nusantara  Indonesia  dalam  rangka  pengembangan  Indonesia in order to develop 7,025sqm of land at 
tanah seluas 7.025m2 di Jalan MT. Haryono Kav 12-13,  Jalan  MT.  Haryono  Kav  12-13,  Jakarta  Timur.  
Jakarta Timur. Jangka waktu operasi berlaku selama 48  The  operating  periods  is  valid  for  48  months  and 
bulan  dan  perjanjian  ini  berakhir  apabila  pelaksanaan  the  agreement  ends  when  the  execution  of  
pekerjaan  proyek  KSO  telah  selesai  dengan  the  joint  venture’s  project  work  has  been 
dibuktikannya  telah  habisnya  masa  pemeliharaan  completed,  demonstrated  with  the  expiration  of            
pekerjaan  kontraktor  dan  KSO,  serta  seluruh  hak  dan  the  maintenance  work  of  the  contractor  and  joint 
kewajiban  antara  KSO  dengan  pembeli,  pihak  ketiga,  venture,  as  well  as  all  rights  and  obligations 
Instansi Pemerintah yang terkait dan berwenang dalam  between  the  joint  venture  and  a  buyer,  a  third 
rangka  pelaksanaan  dan  penyelesaian  KSO  telah  party,  government  agencies  involved  and  is 
terpenuhi  semuanya  tanpa  menimbulkan  tunggakan  competent  in  the  implementation  and  completion 
kewajiban.  of  the  joint  venture  has  been  fulfilled  without 
causing arrears of obligations. 
     
Komposisi  penyertaan  modal  di  dalam  KSO  RNI  –  The  composition  of  the  capital  investment  in           
Waskita terdiri dari RNI berupa tanah seluas 7.052 m2,  the  KSO  RNI  -  Waskita  consists  of  RNI  with  land 
dan  Perusahaan  berupa  modal  kerja  sebesar  areas  of  7,052sqm  and  the  Company  with  initial 
Rp 361.912.928.457.  capital of Rp 361,912,928,457. 
   
Pada  akhir  periode  perjanjian  KSO,  RNI  akan  At  the  end  of  joint  venture  agreement,  RNI  will 
menerima bagi hasil senilai Rp 367.544.705.882.  receive  profit  sharing  amounting  to               
Rp 367,544,705,882. 
   
Perjanjian Dengan PT Kereta Api Indonesia Agreement with PT Kereta Api Indonesia
(Persero) (Persero)
   
Pada  tanggal  30  Nopember  2017,  Perusahaan  On November 30, 2017, the Company entered into 
menandatangani  perjanjian  Kerja  Sama  Usaha  (KSU)  agreement with PT Kereta Api Indonesia (Persero) 
dengan  PT  Kereta  Api  Indonesia  (Persero)  No.  007/P.WKR/2017  related  to  Transit 
No. 007/P.WKR/2017  terkait  dengan  Transit  Development  Orientation  Project  in  Bogor.  Both 
Development Orientation Project di Bogor. Kedua belah  parties  agreed  to  develop  the  utilization  of  land 
pihak  secara  bersama-sama  sepakat  untuk melakukan  owned  by  PT  Kerata  Api  Indonesia  (Persero)  in 
kerjasama  terkait  dengan  pemanfaatan  lahan  milik   Bogor station area. This agreement will be due on 
PT  Kerata  Api  Indonesia  (Persero)  di kawasan  stasiun  November 2070. 
Bogor. Perjanjian ini berakhir pada Nopember 2070. 
   
Perjanjian KSO RNI – WSKT Agreement KSO RNI - WSKT

Pada tanggal 20 Nopember 2017,  KSO RNI – Waskita  On  November  20,  2017,  KSO  RNI  -  Waskita 


membuat  perjanjian  Pengikatan  Jual  Beli  (PPJB)  entered into agreement with WSKT No. 04 on sale 
dengan  WSKT  No.  04  tentang  penjualan  ruang  of  office  space  owned  by  KSO  RNI  Waskita 
perkantoran  pada  proyek  KSO  RNI  Waskita  dengan  project  amounted  to  Rp  563,310,000,000  before 
nilai  jual  Rp  563.310.000.000  sebelum  PPN.  VAT. The payment made by installment basis until            
Pembayaran  atas  penjualan  ini  dilakukan  secara  the  completion  of  development  in  the  fourth 
bertahap  sampai  dengan  penyelesaian  pembangunan  quarter in 2018. 
pada Triwulan IV tahun 2018.  

230
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
UNTUK PERIODE SEMBILAN BULAN FOR THE NINE-MONTH PERIODS
YANG BERAKHIR 30 SEPTEMBER 2019 DAN 2018 ENDED SEPTEMBER 30, 2019 AND 2018
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2018 AND FOR THE YEAR ENDED DECEMBER 31, 2018
(Lanjutan) (Continued)
 
Entitas Anak, PT Waskita Toll Road (WTR)    Subsidiary, PT Waskita Toll Road (WTR) 
 
Dalam  rangka  melakukan  kegiatan  usaha,  WTR    In  connection  with  its  operations,  WTR  entered 
memiliki  perjanjian-perjanjian  penting.  Perjanjian  dan  into  significant  agreements.  The  significant 
ikatan  penting  yang  masih  berlaku  sampai  dengan  agreements  and  commitments  applied  until 
tanggal 30 September 2019 adalah sebagai berikut:  September 30, 2019 are as follows: 
   
Perjanjian Pengikatan Jual Beli Saham Bersyarat Conditional Sale and Purchase Agreement/
(Conditional Sale and Purchase Agreement/ CSPA) CSPA PT Waskita Toll Road and Kings Key
PT Waskita Toll Road dan Kings Key Limited Limited
   
Pada  tanggal  30  September  2019,  WTR  On  September  30,  2019,  WTR  entered  into 
menandatangani  Perjanjian  Pengikatan  Jual  Beli  Conditional  Sale  and  Purchase  Agreement/CSPA 
Saham  Bersyarat  (Conditional  Sale  and  Purchase  with  Kings  Key  Limited  related  to  acquisition  of 
Agreement/  CSPA)  dengan  Kings  Key  Limited  terkait  shares  from  WTR  at  PT  Jasamarga  Solo  Ngawi 
dengan  akuisisi  saham  WTR  di  PT  Jasamarga  Solo  and PT Jasamarga Ngawi Kertosono Kediri.  
Ngawi dan PT Jasamarga Ngawi Kertosono Kediri. 
   
Kings  Key  Limited  mengakuisisi  40%  kepemilikan  Kings  Key  Limited  acquired  40%  of  WTR's 
saham WTR di  PT Jasamarga Solo Ngawi atau setara  ownership  in  PT  Jasamarga  Solo  Ngawi  or 
dengan  Rp  498.334.584.000  dan  40%  kepemilikan  equivalent  to  Rp  498,344,584,000  and  
saham WTR di PT Jasamarga Ngawi  Kertosono Kediri  40%  of  WTR's  ownership  in  PT  Jasamarga  
atau setara dengan Rp 1.292.543.428.000.  Ngawi  Kertosono  Kediri  or  equivalent  to  
Rp 1,292,543,428,000. 
   
58. TANGGUNG JAWAB MANAJEMEN DAN   58. MANAGEMENT RESPONSIBILITY AND
PERSETUJUAN ATAS LAPORAN KEUANGAN APPROVAL OF THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS 
   
Penyusunan  dan  penyajian  wajar  laporan  keuangan  The  preparation  and  fair  presentation  of  the 
konsolidasian  dari  halaman  1  sampai  231  merupakan  consolidated  financial  statements  on  pages  1  to 
tanggung  jawab  manajemen,  dan  telah  disetujui  231  were  the  responsibilities  of  the  management 
oleh  Direktur  untuk  diterbitkan  pada  tanggal  and were approved by the Directors and authorized 
25 Oktober 2019.  for issue on October 25, 2019. 
   

******* 
 
 
p

231

Anda mungkin juga menyukai