Anda di halaman 1dari 164

WAS'$TA

PT WASK|TA KARYA (PERSERo)TBK PT WASKTA KARYA (PERSERO) rB'(


DAN ENTITAS ANAK ATVD SUBS'DIARY

LAPORAN KEUANGAN KOA'SOL'DAS'A'V rHE COII'SOT IDATED FINANCIAL STA TEI'EATS


UNTUK TAHUN.TAHUN YANG BERAKHIR FORTHE YEARS ENDED
30 JUN!2017 DAN 31 DESEMBER 2016 JUNE 30,2017 AND DECEMBER, 2016

^/ I
I

M
"1 ]1

-- ..--<
7'*:.;ry-,
'--)- n
'-*. []E-Tn
*
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
DAFTAR ISI TABLE OF CONTENTS

Halaman/
Pages

SURAT PERNYATAAN DIREKSI DIRECTORS’ STATEMENT LETTER

LAPORAN AUDITOR INDEPENDEN INDEPENDENT AUDITORS’ REPORT

LAPORAN KEUANGAN INTERIM CONSOLIDATED INTERIM FINANCIAL


KONSOLIDASIAN – Tanggal 30 Juni 2017 dan STATEMENTS – As of June 30, 2017 and
31 Desember 2016 dan untuk periode-periode December 31, 2016 and for the six-month periods
enam bulan yang berakhir 30 Juni 2017 dan ended June 30, 2017 and 2016
2016

Laporan Posisi Keuangan Interim Konsolidasian 1 Consolidated Interim Statements of Financial


Position

Laporan Laba Rugi dan Penghasilan Consolidated Interim Statements of Profit or Loss
Komprehensif Lain Interim Konsolidasian 3 and Other Comprehensive Income

Laporan Perubahan Ekuitas Interim Consolidated Interim Statements of Changes in


Konsolidasian 4 Equity

Laporan Arus Kas Interim Konsolidasian 5 Consolidated Interim Statements of Cash Flows

Catatan Atas Laporan Keuangan Interim


Konsolidasian 6 Notes to Consolidated Interim Financial Statements
dtl PT. WASKITA KARYA
wAs,1,.A INDUSTRI KONSTRUKSI
(Persero) Tbk
KANTOR PUSAT
G.du.E lv..llt , Jl. M.T. lhry!.|o Kav. No. '10. ctrJ?E - Jakaira 13340. Tdp. 1021) 850 85't0, 850 85m . Fats. (021) 850 8506. waskh@askite.co.ij . www.waskita.co.ij

PERNYATAAN DIREKSI
TENTANG
TANGGUNG JAWAB ATAS LAPORAN KEUANGAN KONSOLIDASIAN
UNTUK PERIODE YANG BERAKHIR PADA TANGGAL 30 JUNI2017 INDAK DIAUDIT)
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2016 (DIAUDIT)
PT WASKITA KARYA (Persero) Tbk dan ENTITAS ANAK/

BOARD OF DIRECIOR'S SIATEMEI'IT LETTER


RELATING TO
IHE RESPOI'JS,BILITY ON THE C1NSOLIDATED FINAI'IC,AI SIAIEI{EMS
FOR THE PERIODS EIi,DED JUITJE 30, 2017 (UNAUDITED)
AND FOR T HE YEAR ENDED DECEMBER 3 1, 201 6 (AU DITED)
PT WASKTA KARYA (Persero) Ibk and SUBS/D/AR/ES

Kami yang bertanda tangan dibawah inl We, the undesigned.

l. Nama//Vame : lr. M. Choliq, MM


Alamat kantor/Offce Address : Jl. MT Haryono Kav. No. 10 Cawang Jakarta 133,40
Alamat domisili sesuai KTP/ : Jl. Batu Menah ll Kav. 6, RT 007/002, Pejaten Timur,
Domicile 6 stated in D Ard Pasar Minggu, Jakarta Selatan
Nomor Telepon/Phone Number : 021- 7996642
JabatarVPosrtion : Direktur Utama/Pres ident Dircctor

2. Nama/Name : lr. Tunggul Rajagukguk, MM


Alamat kantor/Office Address : Jl. MT Haryono Kav. No. 10 Cawang Jakarta '13340
Alamat domisili sesuai KIP/ '.
Jl. Pendidikan ll 462-63 RT 003/014, Duren Sawit
Donicile I stated in lD Card Jakarta Timur
Nomor Telepon/ Phone Numbet '.
021- 85085'10
Jabatan/Position : 0irektur Keuangan/Finance Director

Menyatakan bahwa : stale thal i


1. Kami bertanggung jawab atas penyusunan dan 1. We are responsrble for he preparatbn nd
penyajian laporan keuangan konsolidasian; prcsentation of the consolidated fnmcial
stalements;
2. Laporan keuangan konsolidasian telah disusun dan 2. The consolidated finarcial statenents have been
disajikan sesuai dengan Standar Akuntansi prepared and presented in confomity with the
Keuangan di lndonesia; lndonesian Financial Accounting Stand ards;
3. a. Semua informasi dalam lapoian keuangan 3. a. Ail information in tlv consolidated linancial
konsolidasian telah dimuat secara lengkap dan statements have been drcc/osed in a complete
benar; and truthful matner:
b. Laporan keuangan konsolidasian tidak b. The consolidated financial statemer:,ts do not
mengandung informasi atau fakta material contain any misleading mateial information or
yang tidak benar, dan tidak menghilangkan facts, and do not onit mateial infomation or
informasi atau fakta material; dan facls: and
4. Kami bertanggung jawab atas sistem pengendalian 4. We are responsible for intemal control system wilhin
intem dalam Peseroan dan Entitas Anak. the Company and its subsidianbs.

Demikian pemyataan ini dibuat dengan sebenamya. This statement left is made truthfu$.

Jakarta, 14 Juli 20'lTlJuly 14, 2017


Direktur Utama / 0irektur Keuangan /
President Diredot Finane Director

.72

M. Choliq Tunggul Ralagukguk


/l
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARY
LAPORAN POSISI KEUANGAN CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN FINANCIAL POSITION
Per 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016
(Dalam Rupiah Penuh) (In Full of Rupiah)
Catatan/ 30 Juni 2017/ 31 Desember 2016/
Notes June 30, 2017 December 31, 2016
Rp Rp

ASET ASSETS
ASET LANCAR CURRENT ASSETS
Kas dan Setara Kas 3, 49, 52 7,539,863,123,881 10,655,996,501,931 Cash and Cash Equivalents
Investasi Jangka-Pendek 4 11,098,200,000 8,448,200,000 Short-Term Investments
Piutang Usaha - Bersih Accounts Receivable - Net
Pihak Berelasi 5, 52 1,092,313,308,051 3,435,212,127,766 Related Parties
Pihak Ketiga 5 2,321,423,546,510 882,248,225,510 Third Parties
Piutang Retensi - Bersih Retention Receivables - Net
Pihak Berelasi 7, 52 593,260,734,921 376,206,099,216 Related Parties
Pihak Ketiga 7 606,748,113,723 590,491,229,164 Third Parties
Piutang Lain-lain lancar - Bersih 8, 52 8,199,386,725,961 5,617,874,190,759 Other Current Receivable - Net
Piutang Ventura Bersama 6 2,647,961,971,149 745,980,988,779 Joint Ventures Receivables
Persediaan 9 2,552,786,756,668 2,556,731,823,542 Inventories
Tagihan Bruto Kepada Pengguna Jasa Gross Amount Due From Customers
Bagian Lancar Current Portion
Pihak Berelasi 10, 52 7,053,144,736,280 5,485,979,232,464 Related Parties
Pihak Ketiga 10 5,751,999,229,321 5,485,823,365,384 Third Parties
Pajak Dibayar Dimuka 11 1,233,457,681,681 1,159,442,786,800 Prepaid Taxes
Uang Muka dan Biaya Dibayar Dimuka 12 2,454,350,496,529 2,706,956,927,690 Advances and Prepayments

TOTAL ASET LANCAR 42,057,794,624,675 39,707,391,699,005 TOTAL CURRENT ASSETS

ASET TIDAK LANCAR NON-CURRENT ASSETS


Investasi Pada Entitas Asosiasi dan Investment in Associates and
Ventura Bersama 13 2,644,760,497,414 2,070,700,688,368 Joint Ventures
Piutang Usaha Tidak Lancar Kepada Non-Current Accounts Receivable
Pihak Berelasi - Bersih 5 -- 180,002,340,000 Related Party - Net
Piutang Lain-lain Tidak Lancar 239,284,747,488 301,861,234,417 Other Non-Current Receivable
Tagihan Bruto Kepada Pengguna Jasa Gross Amount Due From Customers
Bagian Tidak Lancar Non-Current Portion
Pihak Berelasi 10, 52 1,856,006,291,005 1,424,497,716,017 Related Parties
Pihak Ketiga 10 633,749,724,224 713,419,726,684 Third Parties
Properti Investasi 14 53,410,531,080 53,410,531,080 Investment Properties
Investasi Jangka Panjang Lainnya 15 227,622,000,000 548,404,046,393 Other Long-Term Investments
Aset Tetap - Bersih 16 3,801,603,342,554 3,275,335,187,968 Fixed Assets - Net
Goodwill 17 2,351,951,898,287 1,710,769,397,469 Goodwill
Aset Tak Berwujud Intangible Assets
Hak Pengusahaan Jalan Tol 19 21,662,785,020,929 11,153,743,927,058 Toll Road Concession Rights
Aset Pajak Tangguhan 11 127,430,033,607 195,138,147,024 Deferred Tax Assets
Aset Lain-lain 18 245,267,281,696 98,337,532,964 Other Assets
TOTAL ASET TIDAK LANCAR 33,843,871,368,284 21,725,620,475,442 TOTAL NON-CURRENT ASSETS
TOTAL ASET 75,901,665,992,959 61,433,012,174,447 TOTAL ASSETS

Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of the consolidated
laporan keuangan interim konsolidasian financial interim statements

d6/February 5, 2014 1 paraf:


PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARY
LAPORAN POSISI KEUANGAN CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN FINANCIAL POSITION
Per 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016
(Dalam Rupiah Penuh) (In Full of Rupiah)

Catatan/ 30 Juni 2017/ 31 Desember 2016/


Notes June 30, 2017 December 31, 2016
Rp Rp

LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY

LIABILITAS JANGKA PENDEK CURRENT LIABILITIES


Utang Bank Jangka Pendek 20, 52 17,879,068,326,073 12,063,047,151,829 Short-Term Bank Loans
Utang Lembaga Keuangan Non-Bank Loan to Financial Institution Non-Bank
Bagian Jangka Pendek 21 798,850,245,729 3,281,288,365,177 Short-Term Portion
Utang Usaha 22, 52 11,130,706,819,805 7,361,695,071,899 Accounts Payable
Utang Bruto Subkontraktor 23, 52 7,128,105,013,779 7,291,439,066,228 Gross Amount Due to Subcontractors
Biaya yang Masih Harus Dibayar 25 341,045,743,524 251,300,717,225 Accrued Expenses
Utang Pajak 11 287,938,975,098 409,814,781,584 Taxes Payables
Uang Muka Kontrak Jangka Pendek 24 259,289,761,345 557,259,974,420 Advances on Short-Term Contract
Utang Bank Jangka Panjang Current Maturities of
yang Jatuh Tempo dalam Setahun 27 -- 5,392,000,000 Long-Term Bank Loan
Utang Pembelian Aset Tetap Bagian Lancar 159,043,800 224,284,004 Debt Purchases of Fixed Assets - Current Portion
Liabilitas Jangka Pendek Lainnya 26 1,814,414,875,519 239,293,798,492 Other Short-Term Liabilities

TOTAL LIABILITAS JANGKA PENDEK 39,639,578,804,672 31,460,755,210,858 TOTAL CURRENT LIABILITIES

LIABILITAS JANGKA PANJANG


Utang Bank Jangka Panjang 27, 52 5,438,080,743,574 4,147,888,758,601 Long-Term Bank Loans
Utang Lembaga Keuangan Non Bank Loan to Financial Institution Non Bank
Jangka Panjang 21 173,896,700,000 175,000,000,000 Long-Term
Uang Muka Kontrak Jangka Panjang Advances on Long-Term Contract
Pihak Berelasi 31, 52 65,438,946,061 219,672,160,581 Related Parties
Pihak Ketiga 31 623,270,338,493 1,058,642,634,766 Third Parties
Liabilitas Pajak Tangguhan 11 8,963,477,668 8,610,963,161 Deferred Tax Liabilities
Utang Lain-lain Jangka Panjang 30 Other Long-Term Payables
Pihak Berelasi -- 853,981,129 Related Parties
Pihak Ketiga 2,440,357,774,989 1,953,199,902,151 Third Parties
Utang Obligasi - Bersih 29 6,549,365,595,284 5,567,525,204,668 Bonds Payable - Net
Utang Pembelian Aset Tetap Bagian Jangka Panjang 28 322,649,851 305,251,684 Debt Purchases of Fixed Assets - Long-Term Portion
Liabilitas Imbalan Kerja 32 90,875,851,641 67,339,549,900 Employee Benefit Liabilities

TOTAL LIABILITAS JANGKA PANJANG 15,390,572,077,561 13,199,038,406,641 TOTAL NON-CURRENT LIABILITIES

TOTAL LIABILITAS 55,030,150,882,233 44,659,793,617,499 TOTAL LIABILITIES

EKUITAS EQUITY

Modal Saham Share Capital


Modal Saham - Nilai Nominal Rp 100 per Saham pada Share Capital - Rp 100 par Value per Share for
31 Maret 2017 dan 31 Desember 2016 March 31, 2017 and December 31, 2016, respectively
Modal Dasar - 1 Saham Seri A Dwi Warna dan Authorized Capital - 1 share of Dwi Warna Serie A and
25.999.999.999 Saham Seri B pada 25,999,999,999 Shares of Serie B in
31 Maret 2017 dan 31 Desember 2016 March 31, 2017 and December 31, 2016, respectively
Modal Ditempatkan dan Disetor Penuh - Subscribed and Fully Paid Capital
1 Saham Seri A Dwi Warna dan, 1 share of Dwi Warna Serie A and
13.573.709.450 dan 13.573.654.550 Saham Seri B 13,573,709,450 and 13,573,654,550 Shares of Serie B
pada 31 Maret 2017 dan 31 Desember 2016 33 1,357,370,945,000 1,357,365,455,000 March 31, 2017 and December 31, 2016, respectively
Tambahan Modal Disetor 34 5,584,542,962,439 5,882,676,892,384 Additional Paid-in Capital
Saldo Laba 36 Retained Earnings
Telah Ditentukan Penggunaannya 1,047,613,976,281 578,285,992,592 Appropriated
Belum Ditentukan Penggunaannya 3,049,041,132,722 2,755,875,621,660 Unappropriated
Komponen Ekuitas Lainnya 495,887,396,838 495,349,287,477 Other Component of Equity
Jumlah Ekuitas yang Dapat Diatribusikan Total Equity Attributable to
Kepada Pemilik Entitas Induk 11,534,456,413,280 11,069,553,249,113 Owners of Parent
Kepentingan Non-Pengendali 44 9,337,058,697,446 5,703,665,307,835 Non-Controlling Interest
JUMLAH EKUITAS 20,871,515,110,726 16,773,218,556,948 TOTAL EQUITY
JUMLAH LIABILITAS DAN EKUITAS 75,901,665,992,959 61,433,012,174,447 TOTAL LIABILITIES AND EQUITY

Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of the consolidated
laporan keuangan interim konsolidasian financial interim statements

d6/February 5, 2014 2 paraf:


PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARY
LAPORAN LABA RUGI KOMPREHENSIF CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN COMPREHENSIVE INCOME
Untuk Periode-periode Enam Bulan yang Berakhir For the Periods of Six Months Ended
30 Juni 2017 dan 2016 June 30, 2017 and 2016
(Dalam Rupiah Penuh) (In Full of Rupiah)

Catatan/ 30 Juni 2017/ 30 Juni 2016/


Notes June 30, 2017 June 30, 2016
Rp Rp

Pendapatan Usaha 37 15,548,068,138,598 8,084,573,830,131 Revenues


Beban Pokok Pendapatan 38 (12,858,395,996,694) (6,595,213,959,922) Cost of Revenues
LABA BRUTO 2,689,672,141,904 1,489,359,870,209 GROSS PROFIT

Beban Penjualan 39 (15,431,669,486) (16,498,158,041) Selling Expenses


Beban Umum dan Administrasi 39 (370,573,835,475) (227,335,996,823) General and Administrative Expenses
Beban Pajak Final 11 (175,867,430,139) (124,049,627,880) Final Income Tax
Pendapatan Bunga 236,498,281,735 83,607,037,035 Interest Income
Kerugian Selisih Kurs - Bersih (1,060,880,248) (1,712,466,730) Loss on Foreign Exchange Rates - Net
Pendapatan Lain - lain 40 231,831,532,832 23,144,786,054 Other Income
Beban Lain-lain 41 (151,988,292,234) (14,618,389,624) Other Expenses
LABA SEBELUM BEBAN KEUANGAN, PROFIT BEFORE FINANCIAL CHARGES,
BAGIAN LABA (RUGI) BERSIH EQUITY IN NET INCOME (LOSS) OF
ENTITAS ASOSIASI DAN VENTURA BERSAMA 2,443,079,848,889 1,211,897,054,200 ASSOCIATES AND JOINT VENTURES

Beban Keuangan 42 (880,379,588,713) (405,507,510,501) Financial Charges


Bagian Laba (Rugi) Bersih Equity in Net Income (Loss)
Entitas Asosiasi dan Ventura Bersama 43 26,408,877,163 (7,752,120,546) of Associates and Joint Ventures

LABA SEBELUM PAJAK 1,589,109,137,339 798,637,423,153 PROFIT BEFORE TAX

Beban Pajak Penghasilan 11 (162,926,675,707) (216,404,071,773) Income Tax Expenses


LABA PERIODE BERJALAN 1,426,182,461,632 582,233,351,380 PROFIT FOR THE PERIOD

PENGHASILAN KOMPREHENSIF LAIN OTHER COMPREHENSIVE INCOME


Pos-pos yang Tidak Akan Items that Will Not Be Reclassified
Direklasifikasi Kemudian ke Laba Rugi Subsequently to Profit and Loss
Surplus Revaluasi Aset Tetap 2,475,806,407 -- Revaluation Surplus on Fixed Assets
Pengukuran Kembali Program Remeasurement of Defined
Imbalan Pasti - Bersih (5,461,602,419) -- Benefit Plans - Net

Pos-pos yang Akan Direklasifikasi Items that Will Be Reclassified


Kemudian ke Laba Rugi Subsequently to Profit and Loss
Selisih Kurs Penjabaran Exchange Difference on Transalation
Laporan Keuangan dalam of Financial Statements in
Valuta Asing (1,937,697,046) (7,118,003,609) Foreign Currencies

Penghasilan Komprehensif Lain Total Other Comprehensive


Periode Berjalan (4,923,493,058) (7,118,003,609) Income For The Period
TOTAL LABA KOMPREHENSIF TOTAL COMPREHENSIVE
PADA PERIODE BERJALAN 1,421,258,968,574 575,115,347,772 INCOME FOR THE PERIOD

LABA YANG DAPAT DIATRIBUSIKAN KEPADA: PROFIT ATTRIBUTABLE TO:


Pemilik Entitas Induk 1,281,933,282,188 586,268,027,821 Owners of the Parent
Kepentingan Non-Pengendali 44 144,249,179,444 (4,034,676,441) Non-Controlling Interest

LABA PERIODE BERJALAN 1,426,182,461,632 582,233,351,380 PROFIT FOR THE YEAR

JUMLAH LABA KOMPREHENSIF YANG DAPAT TOTAL COMPREHENSIVE INCOME


DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik Entitas Induk 1,277,009,789,130 579,150,024,213 Owners of the Parent
Kepentingan Non-Pengendali 44 144,249,179,444 (4,034,676,441) Non-Controlling Interest

JUMLAH LABA KOMPREHENSIF TOTAL COMPREHENSIVE INCOME


PADA PERIODE BERJALAN 1,421,258,968,574 575,115,347,772 FOR THE PERIOD

Laba dasar dan dilusian per saham 45 94.44 50.12 Basic and diluted earnings per share

Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of the consolidated
laporan keuangan interim konsolidasian financial interim statements

d6/February 5, 2014 3 paraf:


PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARY
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
Untuk Periode-periode Enam Bulan yang Berakhir 30 Juni 2017 dan 2016 For the Periods of Six Months Ended June 30, 2017 and 2017
(Dalam Rupiah Penuh) (In Full of Rupiah)
Dapat Diatribusikan kepada Pemilik Entitas Induk/ Attributable to the Owners of the Parent
Komponen Ekuitas Lainnya/
Other Component of Equity
Tambahan Modal Saldo laba/ Retained earnings Selisih Penjabaran Kepentingan
Disetor/ Ditentukan Belum Ditentukan Laporan Dalam Surplus Revaluasi/ Non-Pengendali/ Jumlah Ekuitas/
Catatan/ Modal Saham/ Additional Paid-In Penggunaannya/ Penggunaannya/ Jumlah/ Mata Uang Asing/ Revaluation Jumlah/ Non-Controlling Total
Notes Shares Capital Capital Appropriated Unappropriated Total Translation Adjustment Surplus Total Interest Equity
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

SALDO 1 JANUARI 2016 1,357,249,331,000 5,881,621,412,790 368,738,372,808 1,564,422,743,777 1,933,161,116,585 (117,087,420,814) 492,150,702,338 9,547,095,141,899 157,111,725,765 9,704,206,867,664 BALANCE AS OF JANUARY 1, 2016

Cadangan Umum 36 -- -- 209,547,619,784 (209,547,619,784) -- -- -- -- -- -- General Reserves


Opsi Saham -- 500,487,637 500,487,637 500,487,637 Shares Option
Dividen Tunai -- -- -- (209,547,624,362) (209,547,624,362) -- -- (209,547,624,362) -- (209,547,624,362) Cash Dividend
Pelaksanaan Opsi Saham 78,754,000 436,522,757 515,276,757 515,276,757 Exercise of Share Options
Kepentingan Non-Pengendali 44 -- -- -- -- -- -- -- -- 193,800,113,919 193,800,113,919 Non-Controlling Interest
Laba Periode Berjalan -- -- -- 586,268,027,822 586,268,027,822 -- -- 586,268,027,822 -- 586,268,027,822 Profit for the Period
Pengukuran Kembali Program Imbalan Pasti Remeasurement of Defined
Bersih 532,335,351 532,335,351 532,335,351 Benefits Plans - Net
Selisih Kurs Penjabaran Laporan Keuangan Exchange Rates Difference on translation
dalam Mata Uang Asing -- -- -- -- -- (7,118,003,609) -- (7,118,003,609) -- (7,118,003,609) of Financial Statements Translation

SALDO PER 30 JUNI 2016 1,357,328,085,000 5,882,558,423,184 578,285,992,592 1,731,595,527,453 2,309,881,520,045 (124,205,424,423) 492,683,037,689 9,918,245,641,495 350,911,839,684 10,269,157,481,179 BALANCE AS OF JUNE 30, 2016

SALDO PER 31 DESEMBER 2016 1,357,365,455,000 5,882,676,892,384 578,285,992,592 2,755,875,621,660 3,334,161,614,252 (10,642,429,932) 505,991,717,409 11,069,553,249,113 5,703,665,307,835 16,773,218,556,948 BALANCE AS OF DECEMBER 31, 2016

Cadangan Umum 36 -- -- 469,327,983,689 (469,327,983,689) -- -- -- -- -- -- General Reserves


Opsi Saham 35 5,490,000 (6,444,124) -- -- -- -- -- (954,124) -- (954,124) Shares Option
Pelaksanaan Opsi Saham 29,612,524 -- -- -- -- -- 29,612,524 -- 29,612,524 Exercise of Share Options
Dividen Tunai -- -- -- (513,978,185,018) (513,978,185,018) -- -- (513,978,185,018) -- (513,978,185,018) Cash Dividend
Kepentingan Non-Pengendali 44 -- -- -- -- -- -- -- -- 3,489,144,210,167 3,489,144,210,167 Non-Controlling Interest
Surplus Revaluasi Aset Tetap -- -- -- -- -- -- 2,475,806,407 2,475,806,407 2,475,806,407 Revaluation Surplus on Fixed Assets
Laba Periode Berjalan -- -- -- 1,281,933,282,188 1,281,933,282,188 -- -- 1,281,933,282,188 144,249,179,444 1,426,182,461,632 Profit for the Period
Penyesuaian atas Perubahan Kepemilikan Adjustment for Changes Ownership
atas Entitas Anak -- (298,157,098,345) -- -- -- -- -- (298,157,098,345) -- (298,157,098,345) in Subsidiaries
Pengukuran Kembali Program Imbalan Pasti Remeasurement of Defined
Bersih -- -- -- (5,461,602,419) (5,461,602,419) -- -- (5,461,602,419) -- (5,461,602,419) Benefits Plans - Net
Selisih Kurs Penjabaran Laporan Keuangan Exchange Rates Difference on translation
dalam Mata Uang Asing -- -- -- -- -- (1,937,697,046) -- (1,937,697,046) -- (1,937,697,046) of Financial Statements in Foreign Currencies
SALDO PER 30 JUNI 2017 1,357,370,945,000 5,584,542,962,439 1,047,613,976,281 3,049,041,132,722 4,096,655,109,003 (12,580,126,978) 508,467,523,816 11,534,456,413,280 9,337,058,697,446 20,871,515,110,726 BALANCE AS OF JUNE 30, 2017

Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of the consolidated
laporan keuangan interim konsolidasian financial interim statements

d6/February 5, 2014 4 paraf:


PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND SUBSIDIARY
LAPORAN ARUS KAS CONSOLIDATED STATEMENTS
KONSOLIDASIAN OF CASH FLOWS
Untuk Periode-periode Enam Bulan yang Berakhir For the Periods of Six Months Ended
30 Juni 2017 dan 2016 June 30, 2017 and 2016
(Dalam Rupiah Penuh) (In Full of Rupiah)

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp
ARUS KAS DARI AKTIVITAS OPERASI CASH FLOWS FROM OPERATING ACTIVITIES
Penerimaan Kas dari Pelanggan 6,801,467,920,881 2,098,131,945,414 Cash Receipts from Customers
Pengeluaran Kas kepada Pemasok (9,428,904,321,305) (6,929,546,071,666) Cash Paid to Suppliers
Pengeluaran Kas kepada Karyawan dan Direksi (208,065,691,303) (139,145,427,592) Cash Paid to Employees and Directors
Kas Dihasilkan dari Operasi (2,835,502,091,727) (4,970,559,553,844) Cash Generated from Operations
Penerimaan Rekening Giro dan Interest Income from Current Account and
Deposito Berjangka 237,218,355,080 83,971,313,958 Time Deposit
Penerimaan Restitusi Pajak 182,144,320,703 437,847,439 Receipt from Tax Restitution
Pembayaran Beban Keuangan (880,379,589,576) (405,507,510,501) Payment for Financial Charges
Pembayaran Pajak (708,646,160,992) (618,362,403,794) Payment for Taxes

Kas Bersih Digunakan untuk Aktivitas Operasi (4,005,165,166,512) (5,910,020,306,742) Net Cash Used in Operating Activities

ARUS KAS DARI AKTIVITAS INVESTASI CASH FLOWS FROM INVESTING ACTIVITIES
Penerimaan dari Ventura Bersama 63,766,648,579 31,371,753,872 Receipt from Joint Ventures
Penempatan pada Ventura Bersama (312,783,690,485) (13,073,072,354) Placement of Joint Ventures
Penempatan Deposito (2,955,234,252,149) -- Placement of Time Deposits
Penerimaan Pencairan Deposito 3,642,839,455,745 -- Receipt from Time Deposits
Perolehan Aset Tetap (708,320,815,006) (991,483,208,298) Acquisition of Fixed Assets
Penerimaan Aset Keuangan Dimiliki Receipt from Held to Maturity
Hingga Jatuh Tempo -- 50,000,000,000 Financial Assets
Perolehan Aset Tak Berwujud (7,713,004,884,822) (296,296,242,864) Acquisition of Intangible Assets
Perolehan Properti Investasi (217,664,200,000) Acquisition of Investment Properties
Penempatan Investasi pada Entitas Asosiasi Placement of Investment In Associates and
dan Jangka Panjang Lainnya (277,388,588,000) (133,900,000,000) and Long-Term Investments

Kas Bersih Digunakan untuk Aktivitas Investasi (8,260,126,126,138) (1,571,044,969,644) Net Cash Used in Investing Activities

ARUS KAS DARI AKTIVITAS PENDANAAN CASH FLOWS FROM FINANCING ACTIVITIES
Pembayaran Emisi Obligasi (2,153,386,364) (4,265,765,688) Bonds Issuance Costs
Penerimaan Penerbitan Obligasi 1,657,000,000,000 2,000,000,000,000 Receipt from Bonds Issuance
Penerimaan Pinjaman Bank 22,288,914,130,843 12,568,192,706,546 Receipt from Bank Loans
Pembayaran Pinjaman Bank (15,124,738,647,212) (6,903,997,700,920) Payment of Bank Loans
Penerimaan (Pembayaran) Pinjaman Lembaga Receipt (Payment) from Financial Institution
Keuangan Non-Bank Bagian Jangka Pendek (2,644,333,302,871) 661,515,863,815 Non Bank-Short Term Portion
Penerimaan Setoran dari Entitas Receipt from
Non-Pengendali 3,489,144,210,167 193,800,113,919 Non-controlling Interest
Penerimaan Tambahan Modal Disetor 17,678,400 937,010,394 Receipt from Additional Paid in Capital
Penerimaan Modal Disetor 5,490,000 78,754,000 Receipt from Paid in Capital
Pembayaran Dividen Tunai (513,978,185,018) (209,547,624,362) Payment of Cash Dividend

Kas Bersih Diperoleh dari Aktivitas Pendanaan 9,149,877,987,945 8,306,713,357,704 Net Cash Provided by Financing Activities

PENURUNAN BERSIH KAS DAN NET DECREASE IN CASH AND


SETARA KAS (3,115,413,304,705) 825,648,081,318 CASH EQUIVALENTS

KEUNTUNGAN SELISIH KURS YANG UNREALIZED GAIN ON


BELUM DIREALISASI (720,073,345) (364,276,922) FOREIGN EXCHANGE RATE
KAS DAN SETARA KAS CASH AND CASH EQUIVALENTS
PADA AWAL PERIODE 10,655,996,501,931 5,511,188,078,778 AT THE BEGINNING OF PERIOD

KAS DAN SETARA KAS CASH AND CASH EQUIVALENTS


PADA AKHIR PERIODE 7,539,863,123,881 6,336,471,883,174 AT THE END OF PERIOD

Transaksi non kas (Catatan 48) Non cash trasaction (Note 48)

Lihat catatan atas laporan keuangan interim konsolidasian yang See accompanying notes to consolidated interim financial
merupakan bagian yang tidak terpisahkan dari statements which are an integral part of the consolidated
laporan keuangan interim konsolidasian financial interim statements

d6/February 5, 2014 5 paraf:


PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016

1. UMUM 1. GENERAL
1.a. Pendirian dan Informasi Umum 1.a. Establishment and General Information
Perusahaan Negara Waskita Karya The State Owned Company Waskita Karya
(“Perusahaan”) didirikan pada tanggal 1 Januari (“the Company”) was established on January 1,
1961 berdasarkan Peraturan Pemerintah No. 62 1961 based on Government Regulation No. 62
tahun 1961, dari perusahaan asing bernama year 1961, from a foreign company named
"Volker Aanemings Maatschappij NV" yang "Volker Aanemings Maatschappij NV" which
dinasionalisasi Pemerintah Republik Indonesia. was nationalized by the Government of the
Republic of Indonesia.
Berdasarkan Peraturan Pemerintah No. 40 According to Government Regulation No. 40
tahun 1970 status Perusahaan berubah dari year 1970, the Company’s status was changed
Perusahaan Negara (PN) menjadi Perseroan from Perusahaan Negara (PN) into Perseroan
(Persero). Selanjutnya, Perusahaan dinamakan (Persero). Furthermore, the Company was
PT Waskita Karya (Persero) berdasarkan Akta named as PT Waskita Karya (Persero) in
Perseroan Terbatas No. 80 tanggal 15 Maret accordance with the Deed of Limited Liability
1973, yang dibuat di hadapan Kartini Mulyadi, Corporation No. 80 dated March 15, 1973 of
S.H., Notaris di Jakarta. Akta Perseroan Kartini Mulyadi, S.H., Notary in Jakarta.
Terbatas tersebut telah disahkan oleh Menteri The deed was approved by the Minister of
Kehakiman Republik Indonesia pada tanggal Justice of the Republic of Indonesia on August
20 Agustus 1973 dengan Surat Keputusan 20, 1973 in his Decree No. 4.a.5/3/310/3 and
No. 4.a.5/310/3 serta diumumkan dalam Berita stated on State Gazette of Republic of
Negara Republik Indonesia No. 82 tanggal Indonesia No. 82 on November 13, 1973,
13 Nopember 1973, Tambahan Berita Negara Supplement No. 91.
No. 91.
Anggaran Dasar Perusahaan telah beberapa The Company's Articles of Association has been
kali mengalami perubahan, terakhir berdasarkan amended for several times, most recently by the
Akta Notaris No. 126 tanggal 31 Maret 2017, Notarial Deed No. 126 on June 30, 2017 of Jose
yang dibuat dihadapan Jose Dima Satria, S.H., Dima Satria, S.H., M.Kn, Notary in Jakarta,
M.Kn, Notaris di Jakarta, antara lain berkaitan concerning among other increase in
dengan peningkatan modal ditempatkan dan the Company’s subscribed and paid up capital.
disetor Perusahaan. Perubahan ini telah The amendment was approved by the Minister
disetujui oleh Menteri Hukum dan Hak Asasi of Law and Human Rights of Republic of
Manusia Republik Indonesia dengan Surat Indonesia in his decision letter No. AHU-
Keputusan No. AHU-0043583.AH.01.11 Tahun 0043583. AH.01.11 Year 2017 dated April 3,
2017 tanggal 3 April 2017. 2017.
Perusahaan berkedudukan di Jakarta, dengan The Company is domiciled in Jakarta, with head
kantor pusat beralamat di Jl. MT Haryono Kav. office located at Jl. MT Haryono Kav. No. 10
No. 10 Cawang, Jakarta 13340. Cawang, Jakarta 13340.
1.b. Entitas Anak 1.b. Subsidiaries
Perusahaan memiliki kepemilikan langsung dan The Company has 50% direct and indirect
tidak langsung lebih dari 50% saham pada ownership interest in subsidiaries and/ or has
entitas anak dan/ atau mempunyai kendali atas control over consolidated subsidiaries
manajemen entitas anak yang dikonsolidasi management as follows:
sebagai berikut:
a. Kepemilikan Langsung/ Direct Ownership

Sebelum Eliminasi/ Before Elimination


Persentase 30 Juni/ June 30, 2017
Kepemilikan/ Jumlah Laba
Percentage (Rugi) Bersih
of Periode Berjalan/
Entitas Anak/ Domisili/ Jenis Usaha/ Tahun Operasi Komersial/ Ownership Jumlah Aset/ Total Profit (Loss)
Subsidiaries Domiciled Nature of Business Start of Commercial Operations % Total Assets for the Period
Rp Rp
PT Waskita Toll Road Jakarta Jalan Tol/ Toll Road 2014 99.99 37,728,781,471,079 (147,700,420,210)
PT Waskita Beton Precast Tbk Jakarta Industri Pabrikasi/ 2014 60.00 14,086,819,111,031 436,297,876,544
Fabrication
PT Waskita Karya Realty Jakarta Properti/ Property 2015 99.99 2,828,964,017,646 23,252,024,689
PT Waskita Karya Energi Jakarta Energi/ Energy Dalam Tahap Pengembangan/ 99.99 38,045,931,316 (5,809,483,401)
Development Stage

6
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

b. Kepemilikan Tidak Langsung/ Indirect Ownership

Sebelum Eliminasi/ Before Elimination


Persentase 30 Juni/ June 30, 2017
Kepemilikan/ Jumlah Laba
Percentage (Rugi) Bersih
of Periode Berjalan/
Entitas Anak/ Domisili/ Jenis Usaha/ Tahun Operasi Komersial/ Ownership Jumlah Aset/ Total Profit (Loss)
Subsidiaries Domiciled Nature of Business Start of Commercial Operations % Total Assets for the Year
Rp Rp
PT Waskita Sangir Energi Jakarta Energi/ Energy 2016 85.00 289,556,096,420 841,958,465
PT Waskita Transjawa Toll Road Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 99.99 11,238,520,582,636 (120,957,684,749)
Development Stage
PT Cimanggis Cibitung Tollways Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 90.00 2,338,029,485,355 (5,255,011,348)
Development Stage
PT Trans Jabar Tol Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 99.99 2,196,313,673,905 5,182,462
Development Stage
PT Pemalang Batang Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 60.00 2,876,175,960,437 250,898,268
Toll Road Development Stage
PT Sriwijaya Markmore Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 60.00 2,309,682,112,947 507,107,007
Persada Development Stage
PT Waskita Bumi Wira Gresik Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 55.00 2,240,131,699,178 57,561,374
Development Stage
PT Semesta Marga Raya Jakarta Jalan Tol/ Toll Road 2010 77.69 3,639,991,407,614 (67,982,894,998)
PT Pejagan Pemalang Tol Road Jakarta Jalan Tol/ Toll Road 2016 99.99 5,179,810,411,515 (53,153,012,542)
PT Transjawa Paspro Jalan Tol Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 80.000 2,384,416,688,145 (36,572,558,680)
Development Stage
PT Kresna Kusuma Dyandra Marga Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 99.99 5,256,409,402,385 279,397,645
Development Stage
PT Cibitung Tanjung Priok Jakarta Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 99.99 898,715,170,102 (1,484,660,573)
Development Stage

PT Waskita Toll Road (WTR) PT Waskita Toll Road (WTR)

Pendirian WTR, (entitas anak) sesuai The establishment of WTR, (subsidiary)


dengan akta notaris No. 62 tanggal 19 Juni was based on notarial deed No. 62 dated
2014 dari notaris Fathiah Helmi, S.H. Akta June 19, 2014 of notary Fathiah Helmi,
pendirian ini telah mendapat persetujuan S.H. The deed was approved by the
oleh Menteri Hukum dan Hak Asasi Manusia Minister of Law and Human Rights through
melalui surat keputusan No. AHU-14734. its decision letter No. AHU-14734.40.
40.10.2014 tanggal 25 Juni 2014. 10.2014 dated June 25, 2014.

PT Waskita Beton Precast Tbk (WBP) PT Waskita Beton Precast Tbk (WBP)

Pendirian WBP, (entitas anak) sesuai The establishment of WBP, (subsidiary)


dengan akta notaris No. 10 tanggal was based on notarial deed No. 10 dated
7 Oktober 2014 dari notaris Fathiah October 7, 2014 of notary Fathiah Helmi,
Helmi, S.H. Akta pendirian ini telah S.H. The deed was approved by
mendapat persetujuan oleh Menteri Hukum the Minister of Law and Human Rights
dan Hak Asasi Manusia melalui surat through its decision letter No. AHU-
keputusan No. AHU-29347.40.10.2014 29347.40. 10.2014 dated October 14, 2014.
tanggal 14 Oktober 2014.

PT Waskita Karya Realty (WKR) PT Waskita Karya Realty (WKR)

Pendirian WKR, (entitas anak) sesuai The establishment of WKR, (subsidiary)


dengan akta notaris No. 27 tanggal was based on notarial deed No. 27 dated
16 Oktober 2014 dari Fathiah Helmi, S.H. October 16, 2014 of notary Fathiah Helmi,
Akta pendirian ini telah mendapat S.H. The deed was approved by
persetujuan oleh Menteri Hukum dan Hak the Minister of Law and Human Rights
Asasi Manusia melalui surat through its decision letter No. AHU-54929.
keputusan No. AHU-54929.AH.01.02. AH.01.02. dated October 23, 2014.
tanggal 23 Oktober 2014.
PT Waskita Karya Energi (WKE) PT Waskita Karya Energi (WKE)

Pendirian WKE, (entitas anak) sesuai The establishment of WKE, (subsidiary)


dengan akta notaris No. 05 tanggal 4 Maret was based on notarial deed No. 05 dated
2016 dari notaris Fathiah Helmi S.H. Akta March 4, 2016 of notary Fathiah Helmi,
pendirian ini telah mendapat persetujuan S.H. The deed was approved by the
oleh Menteri Hukum dan Hak Asasi Manusia Minister of Law and Human Rights through
melalui surat keputusan No. AHU-0019486. its decision letter No. AHU-0019486.
AH.01.01 tahun 2016. AH.01.01 year 2016.

7
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

PT Waskita Sangir Energi (WSE) PT Waskita Sangir Energi (WSE)

Pendirian WSE, (entitas anak WKE) sesuai The establishment of WSE, (subsidiary of
dengan akta notaris No. 22 tanggal 11 Juli WKE) was based on the notarial deed No.
2013 dari notaris Fathiah Helmi, S.H,. Akta 22 dated July 11, 2013 of notary Fathiah
pendirian ini telah mendapat persetujuan Helmi, S.H. The deed was approved by the
oleh Menteri Hukum dan Hak Asasi Manusia Minister of Law and Human Rights through
melalui surat keputusan No. AHU-40852. its decision letter No. AHU-40852.AH.01.
AH.01.01.tahun 2013. 01.year 2013.

Selanjutnya pengalihan kepemilikan Then transfer of ownership of WSE to WKE


(inbreng) WSE ke dalam WKE dilakukan was based on the notarial deed No. 21
berdasarkan dengan akta notaris No. 21 dated December 23, 2016 of Kokoh Henry,
tanggal 23 Desember 2016 dari notaris S.H., M.Kn.
Kokoh Henry, S.H., M.Kn.

PT Waskita Transjawa Toll Road (WTTR) PT Waskita Transjawa Toll Road (WTTR)

Pendirian PT Waskita MNC Transjawa Toll The establishment of PT Waskita MNC


Road, (entitas anak WTR) sesuai dengan Transjawa Toll Road, (subsidiary of WTR)
akta notaris Fathiah Helmi, S.H., No. 25 was based on notarial deed No. 25 dated
tanggal 28 September 2015. Akta pendirian September 28, 2015 of notary Fathiah
ini telah mendapat pengesahan Menteri Helmi, S.H. This notarial deed has been
Hukum dan Hak Asasi Manusia sesuai approved by The Minister of Law
dengan Surat Keputusan No. AHU-2458481. and Human Rights through its decision
AH.01.01.TH.2015 tanggal 29 September letter No. AHU-2458481.AH.01.01.TH.2015
2015. dated September 29, 2015.

Berdasarkan akta notaris Catur Virgo, S.H., Based on notarial deed Catur Virgo, S.H.,
M.H., No. 32 tanggal 27 Mei 2016 telah M.H., No. 32 dated May 27, 2016 which
disetujui perubahan nama dari “PT Waskita approved to change the name of
MNC Transjawa Toll Road” menjadi “PT “PT Waskita MNC Transjawa Toll Road”
Waskita Transjawa Toll Road”. Akta tersebut into “PT Waskita Transjawa Toll Road”. The
telah disahkan oleh Menteri Hukum dan Hak deed was approved by Minister of Law and
Asasi Manusia dalam surat keputusan No. Human Rights in Decree No. AHU-
AHU-AH.01.03-005.3.001 tanggal 31 Mei AH.01.03-005.3.001 dated May 31, 2016.
2016.

PT Cimanggis Cibitung Tollways (CCT) PT Cimanggis Cibitung Tollways (CCT)

Pendirian CCT, (entitas anak WTR) sesuai The establishment of CCT, (subsidiary of
dengan akta notaris No. 52 tanggal WTR) was based on notarial deed No. 52
22 Pebruari 2008 dari notaris Agus Madjid, dated February 22, 2008 of notary Agus
S.H. M.Kn. Akta pendirian ini telah Madjid, S.H. M.Kn. The deed was approved
mendapat persetujuan oleh Menteri Hukum by the Minister of Law and
dan Hak Asasi Manusia melalui surat Human Rights through decision letter
keputusan No. AHU-09738.AH.01.01. No. AHU-09738.AH.01.01.TH.2008 dated
TH.2008 tanggal 27 Pebruari 2008. February 27, 2008.

Selanjutya peralihan pemegang saham Then change in ownership of CCT to WTR


CCT kepada WTR dilakukan berdasarkan was based on notarial deed No. 30 dated
dengan akta notaris No. 30 tanggal 13 Juli July 13, 2015 of notary Jose Dima Satria,
2015 dari notaris Jose Dima Satria, S.H. S.H. M.Kn.
M.Kn.

PT Trans Jabar Tol (TJT) PT Trans Jabar Tol (TJT)

Pendirian TJT, (entitas anak WTR) sesuai The establishment of TJT (subsidiary of
dengan akta notaris Humberg Lie, S.H., WTR) was based on notarial deed No. 79
M.Kn No. 79 tanggal 19 Juli 2007. Akta dated July 19, 2007 of notary Humberg Lie,
pendirian ini telah mendapat persetujuan S.H., M.Kn. This notarial deed has been
oleh Menteri Hukum dan Hak Asasi Manusia approved by The Minister of Law and
melalui surat keputusan No. W29-01398- Human Rights through its decision letter
HT.01.01-TH.2007. No. W29-01398-HT.01.01-TH.2007.

8
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Akuisisi TJT oleh WTR sesuai dengan akta Acquisition of TJT by WTR is in accordance
notaris Jose Dima Satria, S.H., M.Kn No. 44 with the deed of notary Jose Dima Satria,
tanggal 22 Desember 2015. Akta ini telah S.H., M.Kn No. 44 dated December 22,
mendapat persetujuan oleh Menteri Hukum 2015. This deed was approved by Minister
dan Hak Asasi Manusia melalui surat of Law and Human Rights through its letter
No. AHU-AH.01.03-0990894. No. AHU-AH.01.03-0990894.

PT Pemalang Batang Tol Road (PBTR) PT Pemalang Batang Tol Road (PBTR)

Pendirian PBTR, (entitas anak WTR) sesuai The establishment of PBTR, (subsidiary of
dengan akta notaris No. 10 tanggal 15 Juni WTR) was based on notarial deed No. 10
2006 dari notaris Bonardo Nasution S.H. dated June 15, 2006 of notary Bonardo
Akta pendirian ini telah mendapat Nasution, S.H. The deed was approved by
persetujuan dari Menteri Hukum dan Hak the Minister of Law and Human Rights
Asasi Manusia Republik Indonesia melalui through its decision letter No. C-20478
surat keputusan No. C-20478 HT.01.01. TH HT.01.01. TH 2006 dated July 13, 2006.
2006 tanggal 13 Juli 2006.

Selanjutnya peralihan pemegang saham Then change in ownership of PBTR to WTR


PBTR ke dalam WTR berdasarkan akta was based on notarial deed No. 57 dated
notaris No. 57 tanggal 15 Pebruari 2016 dari February 15, 2016 of notary Jose Dima
notaris Jose Dima Satria. Akta ini telah Satria. The deed was approved by Minister
mendapat persetujuan oleh Menteri Hukum of Law and Human Rights through its
dan Hak Asasi Manusia melalui surat decision letter No. AHU-AH.01.03-0982070.
keputusan No. AHU-AH. 01.03-0982070.

PT Sriwijaya Markmore Persada (SRIMP) PT Sriwijaya Markmore Persada (SRIMP)

Pendirian SRIMP, (entitas anak WTR) The establishment of SRIMP, (subsidiary of


sesuai dengan akta notaris No. 51 tanggal WTR) was based on notarial deed No. 51
1 Maret 2016 dari notaris Bonardo Nasution, dated March 1, 2016 of notary
S.H. Akta pendirian ini telah mendapat Bonardo Nasution, S.H. The deed was
persetujuan oleh Menteri Hukum dan Hak approved by the Minister of Law and
Asasi Manusia melalui surat keputusan Human Rights through its decision letter
No. AHU-0019486.AH.01.01.2011 tanggal No. AHU-0019486.AH.01.01.2011 dated
21 Nopember 2011. November 21, 2011.

Selanjutnya peralihan pemegang saham Then change in ownership of SRIMP to


SRIMP ke dalam WTR sesuai dengan akta WTR was based on notarial deed No. 21
notaris No. 21 tanggal 14 Maret 2016 dari dated March 14, 2016 of notary Yusdim
notaris Yusdim Fahim. Akta ini telah Fahim. The deed was approved by Minister
mendapat persetujuan oleh Menteri Hukum of Law and Human Rights through its letter
dan Hak Asasi Manusia melalui surat No. AHU-0005664.AH.01.02.
No. AHU- 0005664.AH.01.02.

PT Waskita Bumi Wira (WBW) PT Waskita Bumi Wira (WBW)

Berdasarkan akta notaris Jose Dima Satria, Based on the notarial deed No. 43 dated
S.H., M.Kn No. 43 tanggal 28 Oktober 2014, October 28, 2014 of Jose Dima Satria,
WTR, (entitas anak) memiliki penyertaan S.H., M.Kn, WTR, (subsidiary) has a
sebesar 48% atas modal disetor ke WBW participation of 48% on the paid in capital of
sebesar Rp 7.500.000.000. WBW amounted to Rp 7,500,000,000.

Berdasarkan akta No. 5 tanggal 4 April Based on Deed No. 5 dated April 4, 2016,
2016, PT Energi Bumi Mining memiliki opsi PT Energi Bumi Mining has the shares
saham untuk membeli kembali transfer option to buy back the 7% transfer of
kepemilikan 7% dari WBW sampai dengan ownership from WBW until December 31,
31 Desember 2016. Setelah periode 2016. After that period the shares option
tersebut opsi saham tersebut akan hangus willl be expired and WBW will be
dan WBW akan dikonsolidasi. consolidated.

9
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pada tanggal 9 Mei 2016, WTR membeli On May 9, 2016, WTR bought WBW’s
saham WBW milik PT Energi Bumi Mining owned by PT Energi Bumi Mining
sebesar Rp 1.094.000.000, sehingga amounted to Rp 1,094,000,000, which
meningkat menjadi 55% berdasarkan increased to 55% based on Decree of The
Keputusan Sirkular Rapat Umum Pemegang Circular of General Meeting of
Saham (RUPS) tangal 3 Mei 2016. Shareholders (GMS) dated May 3, 2016.

PT Semesta Marga Raya (SMR) PT Semesta Marga Raya (SMR)

Pendirian SMR, (entitas anak WTTR) sesuai The establishment of SMR, (subsidiary of
dengan akta notaris No. 127 tanggal WTTR) was based on notarial deed
28 September 2015 dari notaris Humberg No. 127 dated September 28, 2015 of
Lie, S.H., M.Kn. Akta pendirian ini telah notary Humberg Lie, S.H., M.Kn. This
mendapat persetujuan oleh Menteri Hukum notarial deed has been approved by
dan Hak Asasi Manusia melalui surat the Minister of Law and Human Rights
keputusan No. AHU-10.AH.02.02/TH2010. through its decision letter No. AHU-
10.AH.02.02/TH2010.

Selanjutnya pengalihan kepemilikan Then transfer of ownership of SMR to


(inbreng) SMR ke dalam WTTR dilakukan WTTR was based on notarial deed No. 134
berdasarkan akta notaris No. 134 tanggal dated September 28, 2015 of notary
28 September 2015 dari notaris Humberg Humberg Lie, S.H, S.E, M.Kn.
Lie, S.H, S.E, M.Kn.

PT Pejagan Pemalang Tol Road (PPTR) PT Pejagan Pemalang Tol Road (PPTR)

Pendirian PPTR, (entitas anak WTTR) The establishment of PPTR, (subsidiary of


sesuai dengan akta notaris No. 09 tanggal WTTR) was based on notarial deed No. 09
15 Juni 2006 dari notaris Bonardo Nasution, dated June 15, 2016 of notary Bonardo
S.H., M.Kn. Akta pendirian ini telah Nasution, S.H. M.Kn. The deed was
mendapat persetujuan oleh Menteri Hukum approved by the Minister of Law and
dan Hak Asasi Manusia melalui surat Human Rights through its decision letter
keputusan No. C-20455.HT.01.01.TH.2006. No. C-20455.HT.01.01.TH.2006.

Selanjutnya inbreng PPTR oleh WTTR Then transfer of ownership of PPTR to


dilakukan berdasarkan dengan akta notaris WTTR was based on notarial deed No. 40
Fathiah Helmi, S.H. No. 40 tanggal of notary Fathiah Helmi, S.H, dated
30 Oktober 2015. October 30, 2015.

PT Transjawa Paspro Jalan Tol (TPJT) PT Transjawa Paspro Jalan Tol (TPJT)

Pendirian TPJT, (entitas anak WTTR) sesuai The establishment of TPJT, (subsidiary of
dengan akta notaris No. 22 tanggal 21 Mei WTTR) was based on notarial deed No. 22
2007 dari notaris Humberg Lie, S.H., M.Kn. dated May 21, 2007 of notary Humberg Lie,
Akta pendirian ini telah mendapat S.H., M.Kn. This notarial deed has been
persetujuan oleh Menteri Hukum dan Hak approved by the Minister of Law and
Asasi Manusia melalui surat keputusan Human Rights through its decision letter
No. W29-01201HT.01.01-TH.2007. No. W29-01201HT.01.01-TH.2007.

Akuisisi dari TPJT oleh WTTR sesuai Acquisition of TPJT by WTTR is in


dengan akta notaris No. 135 tanggal accordance with the deed No. 135 of
28 September 2015 dari notaris Humberg September 28, 2015 of notary Humberg
Lie, S.H., M.Kn. Akta ini telah mendapat Lie, S.H., M.Kn. This deed was approved
persetujuan oleh Menteri Hukum dan Hak by Minister of Law and Human Rights
Asasi Manusia melalui No. AHU-AH.01.03- through its letter No. AHU - AH.01.03-
0969717. 0969717.

Perusahaan dan entitas anak selanjutnya secara The Company and subsidiaries herein after will
bersama-sama disebut sebagai “Grup”. be referred as “the Group”.

10
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

1.c. Penawaran Umum Efek Perusahaan 1.c. The Public Offering of the Company's
Securities

Saham Shares

Pada tanggal 10 Desember 2012, Perusahaan On December 10, 2012, the Company obtained
memperoleh pernyataan efektif dari Ketua the notice of effectivity notification from the
Badan Pengawas Pasar Modal dan Lembaga Chairman of the Capital Market and Financial
Keuangan (Bapepam-LK) berdasarkan surat Institution Supervisory Agency (Bapepam-LK)
keputusan No. S-14012/BL/2012. through its decree No. S-14012/BL/2012.

Pada tanggal 17 Desember 2012 berdasarkan On December 17, 2012, according to the letter
surat No. S-08414/BEI.PPJ/12-2012 PT Bursa No. S-08414/BEI.PPJ/12-2012, Indonesian
Efek Indonesia (BEI) menyetujui penawaran Stock Exchange (IDX) agreed to the public
efek Perusahaan di BEI kepada masyarakat offering of the Company on IDX for
atas 3.082.315.000 saham biasa dengan nilai 3,082,315,000 of common stock with the par
nominal Rp 100 per saham dan harga value Rp 100 per share and the offering price
penawaran Rp 380 per saham. Rp 380 per share.

Dari jumlah saham yang ditawarkan dalam From the number of shares offered in the public
penawaran umum kepada masyarakat sebesar offering of 6.25% or 192,644,000 of new
6,25% atau sebanyak 192.644.000 saham biasa ordinary shares is allocated to the employees
atas nama baru dijatahkan kepada karyawan through the allocation shares program of the
perusahaan melalui program penjatahan saham Company (Employee Stock Allocation/ ESA).
untuk pegawai Perusahaan (Employee Stock
Allocation/ ESA).

Pada tanggal 19 Desember 2012, seluruh On December 19, 2012, a total of 9,632,236,000
saham Perusahaan sebanyak 9.632.236.000 shares of the Company were listed on the IDX.
saham telah tercatat pada BEI. Pada tanggal On the date June 10, 2015, The Company
10 Juni 2015, Perusahaan memperoleh obtained effective notification from The Board of
pernyataan efektif dari Dewan Komisioner Commissioners of the Financial Services
Otoritas Jasa Keuangan (OJK) atas Pernyataan Authority (OJK) of the Registration Statement in
Pendaftaran dalam rangka Penawaran Umum the Limited Public Offering I (LPO I) through its
Terbatas I (PUT I) berdasarkan surat keputusan decree No. S-238/D.04/2015.
No. S-238/D.04/2015.

Pada tanggal 7 Juli 2015, seluruh saham On July 7, 2015, all the Company’s shares
Perusahaan melalui PUT I sebanyak through the LPO I totaling 3,653,498,200 shares
3.653.498.200 saham telah tercatat pada BEI, have been listed in the IDX, bringing the number
sehingga jumlah keseluruhan saham of shares of the Company after the LPO I
Perusahaan setelah PUT I menjadi sebesar totaling 13,567,473,560 shares.
13.567.473.560 saham.

Obligasi Bonds

Perusahaan telah menerbitkan obligasi dengan The Company has issued bonds with the
rincian sebagai berikut: following details are as follows:

Obligasi/ Jumlah/ Tahun/ Tanggal Penerbitan/ Jatuh Tempo/


No Bonds Amount Years Date of Issuance Due Date Status
1 Seri B/ Tranche B 675.000.000.000 5 5 Juni/ June 5, 2012 5 Juni/ June 5, 2017 Belum Lunas/ Outstanding
2 Berkelanjutan I/ Shelf I 500.000.000.000 3 10 Nopember/ November 10, 2014 10 Nopember/ November 10, 2017 Belum Lunas/ Outstanding
3 Berkelanjutan I Tahap II Seri A/
Shelf I Phase II Tranche A 350.000.000.000 3 16 Oktober/ October 16, 2015 16 Oktober/ October 16, 2018 Belum Lunas/ Outstanding
4 Berkelanjutan I Tahap II Seri B
Shelf II Phase II Tranche B 1.150.000.000.000 5 16 Oktober/ October 16, 2015 16 Oktober/ October 16, 2020 Belum Lunas/ Outstanding
5 Berkelanjutan II Tahap I
Shelf II Phase I 2.000.000.000.000 3 10 Juni/ June 10, 2016 10 Juni/ June 10, 2019 Belum Lunas/ Outstanding
6 Berkelanjutan II Tahap II
Shelf II Phase II 900.000.000.000 5 28 September/ September 28, 2016 28 September/ September 28, 2021 Belum Lunas/ Outstanding
7 Berkelanjutan II Tahap III Seri A
Shelf II Phase III Tranche A 747.000.000.000 3 21 Pebruari/ February 21, 2017 21 Pebruari/ February 21, 2020 Belum Lunas/ Outstanding
8 Berkelanjutan II Tahap III Seri B
Shelf II Phase III Tranche B 910.000.000.000 4 21 Pebruari/ February 21, 2017 21 Pebruari/ February 21, 2022 Belum Lunas/ Outstanding

11
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

1.d. Bidang Usaha 1.d. The Scope of Business

Sesuai dengan pasal 3 Anggaran Dasar In accordance with article 3 of the Company’s
Perusahaan, maksud dan tujuan Perusahaan Articles of Association, the objectives of the
adalah turut melaksanakan dan menunjang Company are to execute and support the
kebijakan dan program pemerintah di bidang government policy and programs in economic
ekonomi dan pembangunan nasional pada area and national development in general,
umumnya, khususnya industri konstruksi, industri specifically in construction industry, fabrication,
pabrikasi, jasa penyewaan, jasa keagenan, rental services, agent services, investment, agro
investasi, agro industri, perdagangan, industry, trading, area management, increase
pengelolaan kawasan, layanan jasa peningkatan ability in the field of construction services,
kemampuan di bidang jasa konstruksi, teknologi information technology, and tourism and
informasi serta kepariwisataan dan developer with implementation in good corporate
pengembangan dengan menerapkan prinsip- governance.
prinsip perseroan terbatas.

Untuk mencapai maksud dan tujuan tersebut di In order to achieve the objectives, the Company
atas, Perusahaan dapat melaksanakan kegiatan engaged in following activities Construction
usaha yaitu Pekerjaan pelaksanaan konstruksi, execution work, mining services, integrated
jasa pertambangan, pekerjaan terintegrasi Engineering, Procurement, and Construction
Enginering, Procurement and Construction (EPC), design and build, management consultant
(EPC), perancangan dan pembangunan (design service, building management, building
and build), layanan jasa konsultasi manajemen, components and raw material fabrication,
gedung manajemen, pabrikasi bahan dan component and construction tools fabrication,
komponen bangunan, pabrikasi komponen dan fabrication of metals, woods, rubber, and plastic
peralatan konstruksi, pabrikasi barang logam, fabrication, leasing on construction equipments,
kayu, karet dan plastik, penyewaan peralatan agent for raw materials, building components
konstruksi, layanan jasa keagenan bahan dan and construction equipment, investment and/or
komponen bangunan serta peralatan konstruksi, business management in area of basic facility
investasi dan/atau pengelolaan usaha di bidang and infrastructure and industry, performing
prasarana dan sarana dasar serta industri, activities in agro industry field, export-import,
melakukan usaha di bidang agro industri, general trading, area management, system
ekspor-impor, perdagangan umum, pengelolaan development, service in information technology
kawasan, pengembangan sistem, layanan jasa and tourism and realty development.
bidang teknologi informasi dan kepariwisataan
dan pengembangan realty.

Kegiatan usaha Perusahaan yang saat ini telah The Company's current business activities, is
dijalankan Perusahaan adalah kegiatan construction activities and integrated EPC.
pelaksanaan konstruksi dan pekerjaan
terintegrasi EPC.

1.e. Organisasi 1.e. Organization

Struktur Organisasi Organization Structure

Berdasarkan Surat Keputusan Menteri Negara According to the Decree of State Ministry of
Badan Usaha Milik Negara (BUMN) dalam Rapat State Owned Enterprise (SOE) in General
Umum Pemegang Saham (RUPS) Perusahaan Meeting of Shareholders (GMS) of the Company
tanggal 17 Maret 2017, menetapkan 6 (enam) dated March 17, 2017, appointed 6 (six) directors
anggota direksi Perusahaan yaitu seorang of the Company consists of a president director
direktur utama dan 5 (lima) direktur. and 5 (five) directors.

12
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Wilayah kerja sesuai surat keputusan direksi Work areas according to the decision letter of
No. 17/SK/WK/2016 tanggal 20 Desember 2016 director No. 17/SK/WK/2016 dated December
tentang perubahan struktur organisasi 20, 2016 regarding to the changes of
Perusahaan, Struktur organisasi Perusahaan the Company’s organizational structure,
berbasis unit bisnis. Unit bisnis mempunyai the organizational structure is based on business
fungsi pemasaran sampai dengan fungsi unit. The business unit has its function of
produksi. Unit bisnis memiliki 6 (enam) divisi, marketing function up to production function.
sebagai berikut: The business unit have 6 (six) divisions, as
follows:

Unit Bisnis/ Wilayah Operasi/ Kedudukan/


Business Unit Work Areas Location

Divisi I/ Daerah operasional meliputi seluruh Indonesia dan luar negeri (kecuali Timor Jakarta
Division I Leste) berkedudukan di Jakarta dengan melaksanakan kegiatan Perusahaan
dalam bidang pemasaran sampai dengan produksi untuk pekerjaan Proyek-
Proyek Gedung, Bandara, Jalan Kereta Api dan LRT, serta Proyek Investasi
dengan nilai kontrak > Rp 300 Miliar.

Operational area covers the whole area of Indonesia and abroad (except Timor
Leste), domiciled in Jakarta to perform its activities in the marketing's area to
production for the entire building project for the works of Building, Airport, Railway
and LRT Projects, as well as Investment Projects with contract value > Rp 300
Billion.

Divisi II/ Daerah operasional meliputi seluruh Indonesia dan Timor Leste berkedudukan di Jakarta
Division II Jakarta dengan melaksanakan kegiatan Perusahaan dalam bidang pemasaran
sampai dengan produksi untuk sipil dan proyek EPC proyek seperti Dams,
Landscape bridges, Docks, Transmissions dan proyek EPC seperti proyek
investasi dengan nilai kontrak > Rp 300 Miliar.

Operational area covers the whole area of Indonesia and Timor Leste, domiciled
in Jakarta to perform its activities in the marketing up to production for Civil and
EPC projects such as Dams, Landscape bridges, Docks, Transmissions and EPC
Projects as well as investment projects with contract value > Rp 300 Billion.

Divisi III/ Daerah operasional meliputi pulau jawa berkedudukan di Jakarta dengan Jakarta
Division III melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan
produksi untuk pekerjaan proyek-proyek jalan tol dan proyek-proyek
pengembangan dengan tidak ada batasan nilai kontrak.

Operational area covers java island, domiciled in Jakarta to perform its activities
in the marketing up to production for toll road projects and devolepment projects
with no contract value restriction.

Divisi IV/ Berkedudukan di Surabaya melaksanakan kegiatan Perusahaan dalam bidang Surabaya
Division IV pemasaran sampai dengan produksi untuk pekerjaan proyek-proyek jalan tol dan
proyek-proyek pengembangan meliputi pulau jawa dengan tidak ada batasan nilai
kontrak.

Domiciled in Surabaya to perform its activities in the marketing up to production


for toll road projects and devolepment projects covers java island with no contract
restriction.

Divisi V/ Daerah operasional seluruh indonesia selain pulau Jawa; berkedudukan di Jakarta
Division V Jakarta dengan melaksanakan kegiatan Perusahaan dalam bidang pemasaran
sampai dengan produksi untuk pekerjaan proyek-proyek jalan tol dan proyek-
proyek pengembangan dengan tidak ada batasan nilai kontrak.

Operational area covers the whole area of Indonesia except Java island,
domiciled in Jakarta to perform its activities in the marketing up to production for
toll road projects and devolepment projects covers java island with no contract
restriction.

Divisi VI/ Berkedudukan di Palembang melaksanakan kegiatan Perusahaan dalam bidang Palembang
Division VI pemasaran sampai dengan produksi untuk pekerjaan proyek-proyek jalan tol dan
proyek-proyek pengembangan meliputi Seluruh Indonesia selain Pulau Jawa
dengan tidak ada batasan nilai kontrak.

Domiciled in Palembang its activities in the marketing up to production for toll


road projects and devolepment projects covers the whole area of indonesia
except Java Island with no contract restriction.

13
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

1.f. Susunan Dewan Komisaris, Direksi dan 1.f. The Composition of Board of
Karyawan Commissioners, Directors and Employees
Susunan Komisaris dan Direksi ditetapkan The composition of Commissioners and
berdasarkan akta keputusan RUPS No. 56 tanggal Directors were approved by the decisions
17 Maret 2017 dari notaris Jose Dima Satria, S.H., deed of GMS No. 56 of notary Jose Dima
M.Kn, dan Akta Keputusan Rapat Umum Satria, S.H., M.Kn, dated March 17, 2017 and
Pemegang Saham Luar Biasa (RUPSLB) No. 52 decisions deed of Extraordinary General
tanggal 25 Nopember 2016 dari notaris Fathiah Meeting Shareholder (EGMS) No. 52 of notary
Helmi, S.H. Fathiah Helmi, S.H., dated November 25,
2016.

Susunan pengurus Dewan Komisaris dan Direksi The composition of the Company’s Board of
Perusahaan pada tanggal 30 Juni 2017 dan Commissioners and Directors as of June 30,
31 Desember 2016 adalah sebagai berikut: 2017 and December 31, 2016 are as follows:

30 Juni/ June 31, 2017 dan/ and


31 Desember/ December 31, 2016

Komisaris Utama Badrodin Haiti President Commissioner


Komisaris Independen M. Aqil Irham Independent Commissioners
Viktor S. Sirait

Komisaris Danis H. Sumadilaga Commissioners


Arif Baharudin
R Agus Sartono
30 Juni/ June 30, 2017 31 Desember/ December 31,
2016
Direktur Utama M. Choliq M. Choliq President Director
Direktur Independen Tunggul Rajagukguk Tunggul Rajagukguk Independent Director
Direktur Adi Wibowo Adi Wibowo Directors
Nyoman Wirya Adnyana Nyoman Wirya Adnyana
Agus Sugiono Agus Sugiono
Bambang Rianto *) -

*) Terhitung sejak 31 Maret 2017, Bambang Rianto *) Since March 31, 2017, Bambang Rianto
diangkat sebagai anggota direksi. appointed as a director.
Komite Audit diangkat melalui surat keputusan Audit Committee was appointed by the
komisaris No. 11/SK/WK/DK/2015 tanggal decision letter of commissioners
30 September 2015. No. 11/SK/WK/DK/2015 dated September 30,
2015.
Susunan Komite Audit Perusahaan pada tanggal The composition of the Company’s Audit
30 Juni 2017 dan 31 Desember 2016 adalah Committee as of June 30, 2017 and
sebagai berikut: December 31, 2016 are as follows:

30 Juni/ June 30, 2017 dan/ and


31 Desember/ December 31, 2016

Ketua Viktor S. Sirait Chairman

Anggota R. Agus Sartono Members


Tjahjo Winarto
Hengki Z. P. Tampubolon

Komite Risiko dan Asuransi diangkat melalui surat Risk and Insurance Committee was appointed
keputusan komisaris No. 12/SK/WK/DK/2015 by the decision letter of commissioners
tanggal 30 September 2015 mengenai penggantian No. 12/SK/WK/DK/2015 of September 30,
anggota Komite Risiko dan Asuransi. 2015 regarding the replacement of Risk and
Insurance’s Committee members.
Susunan Komite Risiko dan Asuransi Perusahaan The composition of the Company’s Risk and
pada tanggal 30 Juni 2017 dan 31 Desember 2016 Insurance Committee as of June 30, 2017 and
adalah sebagai berikut: December 31, 2016 are as follows:

14
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni/ June 30, 2017 dan/ and


31 Desember/ December 31, 2016

Ketua M. Aqil Irham Chairman


Anggota Danis H. Sumadilaga Members
Ahmad Syarif Munawi
Zulfan Zahar

Kepala Satuan Pengendalian Internal dan The Company’s Head of Internal Control and
Sekretaris Perusahaan pada tanggal 30 Juni 2017 Corporate Secretary as of June 30, 2017 and
dan 31 Desember 2016 adalah sebagai berikut: December 31, 2016 are as follows:
30 Juni/ June 31, 31 Desember/ December
2017 31, 2016

Satuan Pengendalian Internal Jonni Hutahaen Jonni Hutahaen Internal Control Section
Sekretaris Perusahaan Shasti Hadi Susilo Corporate Secretary

Jumlah remunerasi yang diterima oleh Dewan The total remuneration have been received by
Komisaris pada 30 Juni 2017, 31 Desember 2016 Board of Commissioners for June 30, 2017,
dan 30 Juni 2016 masing-masing sebesar December 31, 2016 and June 30, 2016 were
Rp 2.991.975.000, Rp 16.397.824.141 dan amounted to Rp 2,991,975,000,
Rp 2.993.925.000. Rp 16,397,824,141 and Rp 2,993,925,000,
respectively.

Jumlah remunerasi yang diterima oleh Direksi pada The total remuneration have been received by
30 Juni 2017, 31 Desember 2016 dan 30 Juni 2016 Directors for June 30, 2017, December 31,
masing-masing sebesar Rp 6.036.300.000, 2016 and June 30, 2016 amounted to
Rp 39.863.300.859 dan Rp 6.341.500.000. Rp 6,036,300,000, Rp 39,863,300,859 and
Rp 6,341,500,000, respectively.

Perusahaan memiliki karyawan tetap masing- The Company has average number of 1,641,
masing sebesar 1.641, 1.426 dan 1.330 orang per 1,426 dan 1,330 employees as of June 30,
30 Juni 2017, 31 Desember 2016 dan 30 Juni 2016. 2017, December 31, 2016 and June 30, 2016,
respectively.

2. IKHTISAR KEBIJAKAN AKUNTANSI YANG 2. SUMMARY OF SIGNIFICANT ACCOUNTING


SIGNIFIKAN POLICIES

a. Pernyataan Kepatuhan a. Statement of Compliance

Laporan keuangan konsolidasian telah disusun dan The consolidated financial statements were
disajikan sesuai dengan Standar Akuntansi prepared and presented in accordance with
Keuangan di Indonesia yang meliputi Pernyataan Indonesian Financial Accounting Standards
Standar Akuntansi Keuangan (PSAK) dan which include the Statement of Financial
Interpretasi Standar Akuntansi Keuangan (ISAK) Accounting Standards (PSAK) and
yang diterbitkan oleh Dewan Standar Akuntansi Interpretation of Financial Accounting
Keuangan – Ikatan Akuntan Indonesia (DSAK–IAI), Standards (ISAK) issued by the Financial
serta peraturan Pasar Modal yang berlaku antara Accounting Standard Board – Indonesian
lain Peraturan Otoritas Jasa Keuangan/ Badan Institute of Accountant (DSAK–IAI), and
Pengawas Pasar Modal dan Lembaga Keuangan regulations in the Capital Market include
(OJK/Bapepam-LK) No. VIII.G.7 tentang pedoman Regulations of Financial Services Authority/
penyajian laporan keuangan, keputusan Ketua Capital Market and Supervisory Board and
Bapepam-LK No. KEP-347/BL/2012 tentang Financial Institution (OJK/Bapepam-LK)
penyajian dan pengungkapan laporan keuangan No. VIII.G.7 regarding guidelines for the
emiten atau perusahaan publik. presentation of financial statements, decree of
Chairman of Bapepam-LK No. KEP-
347/BL/2012 regarding presentation and
disclosure of financial statements of the issuer
or public company.

15
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

b. Dasar Pengukuran dan Penyusunan Laporan b. The Basis of Measurement and Preparation
Keuangan Konsolidasian of Consolidated Financial Statements

Dasar pengukuran dalam penyusunan laporan The basis of measurement in the preparation of
keuangan konsolidasian ini adalah konsep biaya these consolidated financial statements is
perolehan (historical cost), kecuali untuk akun aset historical cost method, except for
tetap yang telah dinilai kembali (revaluasi) di tahun the revaluation of fixed assets in year 2000,
2000, investasi dalam efek tertentu yang dicatat investments in shares of stock which are
sebesar nilai wajarnya atau dicatat menggunakan carried at its fair value or accounted for under
metode ekuitas, persediaan yang dinyatakan the equity method, and inventories which are
sebesar nilai yang lebih rendah antara harga carried at the lower of cost and net realizable
perolehan dan nilai realisasi bersih (the lower of value. The consolidated financial statements
cost or net realizable value). Laporan keuangan are prepared using the accrual method, except
konsolidasian disusun dengan menggunakan for the consolidated statements of cash flows.
metode akrual kecuali untuk laporan arus kas
konsolidasian.

Laporan arus kas konsolidasian disusun dengan The statements of cash flows are prepared
menggunakan metode langsung (direct method) using the direct method by classifying cash
dengan mengelompokkan arus kas ke dalam flows into operating, investing and financing
aktivitas operasi, investasi dan pendanaan. activities.

Mata uang penyajian yang digunakan dalam The presentation currency used in the
penyusunan laporan keuangan konsolidasian ini preparation of the consolidated financial
adalah Rupiah (Rp) yang merupakan mata uang statements is Indonesian Rupiah (Rp) which is
fungsional Grup. Setiap entitas di dalam Grup the functional currency of the Group. Each
menetapkan mata uang fungsional sendiri dan entity in the Group determines its own
unsur-unsur dalam laporan keuangan dari setiap functional currency and items included in the
entitas diukur berdasarkan mata uang fungsional financial statements of each entity are
tersebut. measured using that functional currency.

c. Prinsip-prinsip Konsolidasian c. Principles of Consolidation

Laporan keuangan konsolidasian mencakup The consolidated financial statements


laporan keuangan Perusahaan dan entitas-entitas incorporate the financial statements of
anak seperti disebutkan pada Catatan 1.b. the Company and subsidiaries as described in
Note 1.b.

Entitas anak adalah entitas yang dikendalikan oleh A subsidiary is an entity controlled by the Group,
Grup, yakni Grup terekspos, atau memiliki hak, atas i.e. the Group is exposed, or has rights, to
imbal hasil variabel dari keterlibatannya dengan variable returns from its involvement with
entitas dan memiliki kemampuan untuk the entity and has the ability to affect those
mempengaruhi imbal hasil tersebut melalui returns through its current ability to direct
kemampuan kini untuk mengarahkan aktivitas the entity’s relevant activities (power over
relevan dari entitas (kekuasaan atas investee). the investee).

Keberadaan dan dampak dari hak suara potensial The existence and effect of substantive potential
dimana Grup memiliki kemampuan praktis untuk voting rights that the Group has the practical
melaksanakan (yakni hak substantif) ability to exercise (i.e. substantive rights) are
dipertimbangkan saat menilai apakah Grup considered when assessing whether the Group
mengendalikan entitas lain. controls another entity.

Laporan keuangan Grup mencakup hasil usaha, The Group’s financial statements incorporate
arus kas, aset dan liabilitas dari Perusahaan dan the results, cash flows, assets and liabilities of
seluruh entitas anak yang secara langsung dan tidak the Company and all of its subsidiaries are
langsung dikendalikan oleh Perusahaan. Entitas directly and indirectly controlled. Subsidiaries
anak dikonsolidasikan sejak tanggal efektif akuisisi, are consolidated from the effective date of
yaitu tanggal dimana Grup secara efektif acquisition, which is the date on which
memperoleh pengendalian atas bisnis yang the Group effectively obtains control of
diakuisisi, sampai tanggal pengendalian berakhir. the acquired business, until that control ceases.

16
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Entitas induk menyusun laporan keuangan A parent prepares consolidated financial


konsolidasian dengan menggunakan kebijakan statements using uniform accounting policies for
akuntansi yang sama untuk transaksi dan peristiwa like transactions and other events in similar
lain dalam keadaan yang serupa. Seluruh transaksi, circumstances. All intragroup transactions,
saldo, laba, beban, dan arus kas dalam intra balances, income, expenses and cash flows are
kelompok usaha terkait dengan transaksi antar eliminated in full on consolidation.
entitas dalam grup dieliminasi secara penuh.

Grup mengatribusikan laba rugi dan setiap The Group attributed the profit and loss and
komponen dari penghasilan komprehensif lain each component of other comprehensive
kepada pemilik entitas induk dan kepentingan non- income to the owners of the parent and non-
pengendali meskipun hal tersebut mengakibatkan controlling interest even though this results in
kepentingan non-pengendali memiliki saldo defisit. the non-controlling interests having a deficit
Grup menyajikan kepentingan non-pengendali di balance. The Group presents non-controlling
ekuitas dalam laporan posisi keuangan interest in equity in the consolidated statement
konsolidasian, terpisah dari ekuitas pemilik entitas of financial position, separately from the equity
induk. owners of the parent.

Perubahan dalam bagian kepemilikan entitas induk Changes in the parent’s ownership interest in a
pada entitas anak yang tidak mengakibatkan subsidiary that do not result in loss of control are
hilangnya pengendalian adalah transaksi ekuitas equity transactions (i.e. transactions with
(yaitu transaksi dengan pemilik dalam kapasitasnya owners in their capacity as owners). When
sebagai pemilik). Ketika proporsi ekuitas yang the proportion of equity held by non-controlling
dimiliki oleh kepentingan non-pengendali berubah, interest change, the Group adjusted the carrying
Grup menyesuaikan jumlah tercatat kepentingan amounts of the controlling interest and non-
pengendali dan kepentingan non-pengendali untuk controlling interest to reflect the changes in their
mencerminkan perubahan kepemilikan relatifnya relative interest in the subsidiaries. Any
dalam entitas anak. Selisih antara jumlah dimana difference between the amount by which
kepentingan non-pengendali disesuaikan dan nilai the non-controlling interests are adjusted and
wajar dari jumlah yang diterima atau dibayarkan the fair value of the consideration paid or
diakui langsung dalam ekuitas dan diatribusikan received is recognized directly in equity and
pada pemilik dari entitas induk. attributed to the owners of the parent.

Jika Grup kehilangan pengendalian, maka Grup: If the Group loses control, the Group:

(a) Menghentikan pengakuan aset (termasuk (a) Derecognizes the assets (including
goodwill) dan liabilitas entitas anak pada jumlah goodwill) and liabilities of the subsidiary at
tercatatnya ketika pengendalian hilang; their carrying amounts at the date when
control is lost;

(b) Menghentikan pengakuan jumlah tercatat (b) Derecognizes the carrying amount of any
setiap kepentingan nonpengendali pada entitas non-controlling interests in the former
anak terdahulu ketika pengendalian hilang subsidiary at the date when control is lost
(termasuk setiap komponen penghasilan (including any components of other
komprehensif lain yang diatribusikan pada comprehensive income attributable to
kepentingan non-pengendali); them);

(c) Mengakui nilai wajar pembayaran yang diterima (c) Recognizes the fair value of
(jika ada) dari transaksi, peristiwa, atau the consideration received, (if any) from the
keadaan yang mengakibatkan hilangnya transaction, event or circumstances that
pengendalian; resulted in the loss of control;

(d) Mengakui sisa investasi pada entitas anak (d) Recognizes any investment retained in
terdahulu pada nilai wajarnya pada tanggal the former subsidiary at fair value at
hilangnya pengendalian; the date when control is lost;

(e) Mereklasifikasi ke laba rugi, atau mengalihkan (e) Reclassifies to profit or loss, or transfer
secara langsung ke saldo laba jika disyaratkan directly to retained earnings if required by
oleh SAK lain, jumlah yang diakui dalam other FAS’s, the amount recognized in
penghasilan komprehensif lain dalam kaitan other comprehensive income in relation to
dengan entitas anak; dan the subsidiary; and

17
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

(f) Mengakui perbedaan apapun yang dihasilkan (f) Recognizes any resulting difference as a
sebagai keuntungan atau kerugian dalam laba gain or loss attributable to the parent.
rugi yang diatribusikan kepada entitas induk.

d. Penerapan Standar Akuntansi Keuangan Baru d. Adoption of New and Revised Statements of
dan Revisi (PSAK) dan Intrepretasi Standar Financial Accounting Standards (PSAK) and
Akuntansi Keuangan (ISAK) Interpretation of PSAK (ISAK)

i. Standar yang berlaku efektif pada tahun i. Standards and amendments effective in
berjalan the current year

Dalam tahun berjalan, Grup telah menerapkan In the current year, the Group has applied a
standar baru, sejumlah amandemen dan new standard, a number of amendments,
interpretasi PSAK yang dikeluarkan oleh Dewan and an interpretation to PSAK issued by
Standar Akuntansi Keuangan dari Ikatan the Financial Accounting Standard Board of
Akuntan Indonesia yang relevan dengan the Indonesian Institute of Accountants that
operasinya dan efektif untuk periode akuntansi are relevant to its operations and effective
yang dimulai pada 1 Januari 2017. for accounting period beginning on
January 1, 2017.

Penerapan amandemen dan interpretasi The appllication of the following


standar berikut yang efektif untuk periode yang amendments, and intepretation to
dimulai pada atau setelah 1 Januari 2017, standards amendments and interpretation
dengan penerapan dini diperkenankan tidak effective for periods beginning on or after
memiliki pengaruh signifikan atas January 1, 2017, with early application is
pengungkapan atau jumlah yang dicatat di permitted have not resulted to material
dalam laporan keuangan konsolidasian pada impact to disclosures or on the amounts
tahun berjalan dan tahun sebelumnya: recognized in the current and prior year
consolidated financial statements:

 PSAK 1: Penyajian Laporan Keuangan  PSAK 1: Presentation of Financial


tentang Prakarsa Pengungkapan; dan Statements about Disclosure Initiative;
and
ISAK 31: Interpretasi atas Ruang Lingkup  ISAK 31: Scope Interpretation of
PSAK 13: Properti Investasi. PSAK 13: Investment Property.
ii. Standar dan interpretasi telah diterbitkan ii. Standards and interpretations issued
tapi belum diterapkan not yet adopted

Standar dan amandemen standar berikut efektif Standard and amendment to standard
untuk periode yang dimulai pada atau setelah effective for periods beginning on or after
tanggal 1 Januari 2018, dengan penerapan dini January 1, 2018, with early application
diperkenankan yaitu: permitted are:

 Amandemen PSAK 16: Aset Tetap; dan  Amendments to PSAK 16: Property,
Plant and Equipment; dan
 PSAK 69: Agrikultur.  PSAK 69: Agriculture.

Sampai dengan tanggal penerbitan laporan As of the issuance date of the consolidated
keuangan interim konsolidasian, dampak dari interim financial statements, the effect of
standar amandemen dan interpretasi tersebut adoption of these standards, amendments
terhadap laporan keuangan interim and interpretations on the consolidated
konsolidasian tidak dapat diketahui atau interim financial statements is not known
diestimasi oleh manajemen. nor reasonably estimable by management.

e. Transaksi dan Penjabaran Laporan Keuangan e. Foreign Currency Transactions and


dalam Mata Uang Asing Translation of Financial Statements

Dalam menyiapkan laporan keuangan, Grup In preparing financial statements, the Group
mencatat dengan menggunakan mata uang dari record by using the currency of the primary
lingkungan ekonomi utama di mana entitas economic environment in which the entity
beroperasi (“mata uang fungsional”). Mata uang operates (“the functional currency”). The
fungsional Grup adalah Rupiah (Rp). functional currency of the Group is Rupiah (Rp).

18
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Mata uang fungsional Kantor cabang di Dubai, The functional currency of branch office in
Malaysia dan Timor Leste, adalah Arab Emirat Dubai, Malaysia and Timor Leste are Arab
Dirham (AED), Saudi Arab Real (SAR), Ringgit Emirat Dirham (AED), Saudi Arab Real (SAR),
(MYR) dan Dolar Amerika Serikat (USD). Untuk Ringgit (MYR) and United States Dollar (USD).
tujuan penyajian laporan keuangan konsolidasian, For presentation purposes of consolidated
aset dan liabilitas Kantor cabang di Dubai dan financial statements, assets and liabilities of
Timor Leste, pada tanggal laporan dijabarkan ke branches in Dubai and Timor Leste at reporting
Rupiah (Rp) menggunakan kurs penutup yang date are translated to Rupiah (Rp) at the
berlaku pada tanggal laporan posisi keuangan, closing rate at statement of financial position
sedangkan pendapatan dan beban dijabarkan date, while revenues and expenses are
dengan menggunakan kurs rata-rata. Untuk tujuan translated using average rate for the period. For
penggabungan, laporan keuangan kantor cabang combining purpose, the financial statements of
luar negeri dijabarkan dalam Rp dengan kurs the branch office are translated into Rp based
Reuters, sedangkan kantor cabang Malaysia dan on Reuters Rate, while Malaysia and Timor
Timor Leste menggunakan mata uang Ringgit dan Leste Branch maintained in Ringgit and United
Amerika Dolar (USD) dengan kurs Bank Indonesia Stated Dollar (USD) using Bank Indonesia (BI)
(BI). Selisih kurs yang dihasilkan diakui dalam rate. All resulting exchange differences shall be
penghasilan komprehensif lain. recognized in other comprehensive income.

Transaksi-transaksi selama tahun berjalan dalam Transactions during the current year in foreign
mata uang asing dicatat dalam Rp dengan kurs spot currencies are recorded in Rp by applying to
antara Rupiah dan valuta asing pada tanggal the foreign currency amount the spot exchange
transaksi. Pada akhir periode pelaporan, pos rate between Rp and the foreign currency at the
moneter dalam mata uang asing dijabarkan ke date of transactions. At the end of reporting
dalam Rp menggunakan kurs penutup, yaitu kurs period, foreign currency monetary items are
tengah BI pada 30 Juni 2017 dan 31 Desember translated to Rupiah using the closing rate, i.e
2016 sebagai berikut: middle rate of BI at June 22, 2017, June 30,
2017 and December 31, 2016 as follows:

KURS 30 Juni/June , 2017 31 Desember/December, 2016


USD 13,319 13,436
SGD 9,591 9,299
EURO 14,875 14,162
MYR 3,110 2,996
SAR 3,552 3,582
YEN 120 115

f. Transaksi dan Saldo dengan Pihak Berelasi f. Related Party Transactions and Balances

Pihak berelasi adalah orang atau entitas yang terkait A related party is a person or an entity that is
dengan entitas pelapor: related to the reporting entity:
a) Orang atau anggota keluarga dekatnya a) A person or a close member of that
mempunyai relasi dengan entitas pelapor jika person’s family is related to a reporting
orang tersebut: entity if that person:
i. memiliki pengendalian atau pengendalian i. has control or joint control over
bersama atas entitas pelapor; the reporting entity;
ii. memiliki pengaruh signifikan atas entitas ii. has significant influence over
pelapor; atau the reporting entity; or
iii. merupakan personil manajemen kunci entitas iii. is a member of the key management
pelapor atau entitas induk dari entitas personnel of the reporting entity or of a
pelapor. parent of the reporting entity.

19
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

b) Suatu entitas berelasi dengan entitas pelapor b) An entity is related to the reporting entity if
jika memenuhi salah satu hal berikut: any of the following conditions applies:
i. Entitas dan entitas pelapor adalah anggota i. The entity and the reporting entity are
dari kelompok usaha yang sama (artinya members of the same group (which
entitas induk, entitas anak, dan entitas anak means that each parent, subsidiary and
berikutnya saling berelasi dengan entitas fellow subsidiary is related to the others;
lain);
ii. Satu entitas adalah entitas asosiasi atau ii. One entity is an associate or joint
ventura bersama dari entitas lain (atau venture of the other entity (or an
entitas asosiasi atau ventura bersama yang associate or joint venture of a member
merupakan anggota suatu kelompok usaha, of a group of which the other entity is a
yang mana entitas lain tersebut adalah member);
anggotanya);
iii. Kedua entitas tersebut adalah ventura iii. Both entities are joint ventures of the
bersama dari pihak ketiga yang sama; same third party;
iv. Satu entitas adalah ventura bersama dari iv. One entity is a joint venture of a third
entitas ketiga dan entitas yang lain adalah entity and the other entity is an
entitas asosiasi dari entitas ketiga; associate of the third entity;
v. Entitas tersebut adalah suatu program v. The entity is a post-employment benefit
imbalan pasca kerja untuk imbalan kerja dari plan for the benefit of employees of
salah satu entitas pelapor atau entitas yang either the reporting entity, or an entity
terkait dengan entitas pelapor. Jika entitas related to the reporting entity. If the
pelapor adalah entitas yang reporting entity in itself such a plan, the
menyelenggarakan program tersebut, maka sponsoring employers are also related
entitas sponsor juga berelasi dengan entitas to the reporting entity;
pelapor;
vi.
vii. Entitas yang dikendalikan atau dikendalikan vi. The entity is controlled or jointly
bersama oleh orang yang diidentifikasi controlled by a person identified in (a);
dalam huruf (a);
viii.
ix. Orang yang diidentifikasi dalam huruf (a) (i) vii. A person identified in (a) (i) has
memiliki pengaruh signifikan atas entitas significant influence over the entity or is
atau merupakan personil manajemen kunci a member of the key management
entitas (atau entitas induk dari entitas); atau personnel of the entity (or a parent of
the entity); or
x.
xi. Entitas, atau anggota dari kelompok yang viii. The entity, or any member of a group of
mana entitas merupakan bagian dari which it is a part, provides key
kelompok tersebut, menyediakan jasa management personnel services to the
personil manajemen kunci kepada entitas reporting entity or to the parent of the
palapor atau kepada entitas induk dari reporting entity.
entitas pelapor.

20
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Entitas yang berelasi dengan pemerintah adalah A government-related entity is an entity that is
entitas yang dikendalikan, dikendalikan bersama, controlled, jointly controlled or significant
atau dipengaruhi oleh pemerintah. Pemerintah influence by a government. Government refers
mengacu kepada pemerintah, instansi pemerintah to government, government agencies and
dan badan yang serupa baik lokal, nasional similar bodies whether local, national or
maupun internasional. international.
Entitas yang berelasi dengan Pemerintah dapat Government related entity can be an entity
berupa entitas yang dikendalikan atau dipengaruhi which controlled or significantly influenced by
secara signifikan oleh Kementerian Keuangan atau the Ministry of Finance or Local Government
Pemerintah Daerah yang merupakan Pemegang that representing as the shareholders of the
Saham entitas, atau entitas yang dikendalikan oleh entity or an entity controlled by the
Pemerintah Republik Indonesia melalui Government of Republic of Indonesia,
Kementerian BUMN sebagai kuasa pemegang represented by the SOE’s Ministry as a
saham. shareholder’s representative.
Grup telah mengungkapkan seluruh sifat dan The Group has disclosed all the nature and
transaksi dengan pihak-pihak berelasi (Catatan 53). transactions unit related parties
(Note 53).
g. Instrumen Keuangan g. Financial Instrument
Pengakuan dan Pengukuran Awal Initial Recognition and Measurement
Grup mengakui aset keuangan atau liabilitas The Group recognize a financial assets or a
keuangan dalam laporan posisi keuangan financial liabilities in the consolidated
konsolidasian, jika dan hanya jika, Grup menjadi statement of financial position when, and only
salah satu pihak dalam ketentuan pada kontrak when, it becomes a party to the contractual
instrumen tersebut. Pada saat pengakuan awal provisions of the instrument. At initial
aset keuangan atau liabilitas keuangan, Grup recognition, the Group measure all financial
mengukur pada nilai wajarnya. Dalam hal aset assets and financial liabilites at its fair value. In
keuangan atau liabilitas keuangan tidak diukur the case of a financial asset or financial liability
pada nilai wajar melalui laba rugi, nilai wajar not at fair value through profit or loss, fair
tersebut ditambah atau dikurang dengan biaya value plus or minus with the transaction costs
transaksi yang dapat diatribusikan secara langsung that are directly attributtable to the acquisition
dengan perolehan atau penerbitan aset keuangan or issue of the financial asset or financial
atau liabilitas keuangan tersebut. Biaya transaksi liability. Transaction costs incurred on
yang dikeluarkan sehubungan dengan perolehan acquisition of a financial asset and issue of a
aset keuangan dan penerbitan liabilitas keuangan financial liability classified at fair value through
yang diklasifikasikan pada nilai wajar melalui laba profit or loss are expensed immediately.
rugi dibebankan segera.
Pengukuran Selanjutnya Aset Keuangan Subsequent Measurement of Financial
Assets

Pengukuran selanjutnya aset keuangan tergantung Subsequent measurement of financial assets


pada klasifikasinya pada saat pengakuan awal. depends on their classification on initial
Grup mengklasifikasikan aset keuangan dalam recognition. The Group classifies financial
salah satu dari empat kategori berikut: assets in one of the following four categories:

(i) Aset Keuangan yang Diukur pada Nilai Wajar (i) Financial Assets at Fair Value Through
Melalui Laba Rugi (FVTPL) Profit or Loss (FVTPL)

Aset keuangan yang diukur pada FVTPL Financial assets at FVTPL are financial
adalah aset keuangan yang dimiliki untuk assets held for trading or upon initial
diperdagangkan atau yang pada saat recognition it is designated as at fair
pengakuan awal telah ditetapkan untuk diukur value through profit or loss.
pada nilai wajar melalui laba rugi.

Aset keuangan diklasifikasikan dalam Financial asset classified as held for


kelompok diperdagangkan jika diperoleh atau trading if it is acquired or incurred
dimiliki terutama untuk tujuan dijual atau dibeli principally for the purpose of selling and
kembali dalam waktu dekat, atau bagian dari repurchasing it in the near term, or it is a
portofolio instrumen keuangan tertentu yang part of a portfolio of identified financial
dikelola bersama dan terdapat bukti mengenai instruments that are managed together
pola ambil untung dalam jangka pendek aktual and for which there is evidence of a
saat ini, atau merupakan derivatif, kecuali recent actual pattern of short-term profit

21
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

derivatif yang ditetapkan dan efektif sebagai taking, or it is a derivative, except for a
instrumen lindung nilai. derivative that is a designated and
effective hedging instrument.

Setelah pengakuan awal, aset keuangan yang After initial recognition, financial assets at
diukur pada FVTPL diukur pada nilai wajarnya. FVTPL are measured at its fair value.
Keuntungan atau kerugian yang timbul dari Gains or losses arising from a change in
perubahan nilai wajar aset keuangan diakui the fair value of financial assets are
dalam laba rugi. recognized in profit or loss.

(ii) Pinjaman yang Diberikan dan Piutang (ii) Loans and Receivables

Pinjaman yang diberikan dan piutang adalah Loans and receivables are non-derivative
aset keuangan non-derivatif dengan financial assets with fixed or determinable
pembayaran tetap atau telah ditentukan dan payments that are not quoted in an active
tidak mempunyai kuotasi di pasar aktif, market, other than:
kecuali:

(a) Pinjaman yang diberikan dan piutang yang (a) Those that intends to sell immediately
dimaksudkan untuk dijual dalam waktu or in the near term and upon initial
dekat dan yang pada saat pengakuan recognition designated as at fair value
awal ditetapkan sebagai aset keuangan through profit or loss;
yang diukur pada nilai wajar melalui laba
rugi;

(b) Pinjaman yang diberikan dan piutang (b) Those for which the holder may not
dalam hal pemilik mungkin tidak akan recover substantially all of its initial
memperoleh kembali investasi awal investment, other than because of
secara substansial kecuali yang credit deterioration; or
disebabkan oleh penurunan kualitas
pinjaman; atau

(c) Pinjaman yang diberikan dan piutang yang (c) Those that upon initial recognition
pada saat pengakuan awal ditetapkan designated as available for sale.
sebagai tersedia untuk dijual.

Setelah pengakuan awal, pinjaman yang After initial recognition, loans and
diberikan dan piutang diukur pada biaya receivables are measured at amortized
perolehan diamortisasi dengan menggunakan cost using the effective interest method.
metode suku bunga efektif.
Pada 30 Juni 2017 dan 31 Desember 2016, As of June 30, 2017 and December 31,
Grup mempunyai piutang usaha, piutang 2016, the Group has accounts receivable,
retensi, piutang lain-lain, dan tagihan bruto retention receivables, other receivables,
kepada pengguna jasa yang diklasifikasikan and gross amount due from customers
sebagai pinjaman yang diberikan dan piutang. which were classified as loans and
receivables.

(iii) Investasi Dimiliki Hingga Jatuh Tempo (HTM) (iii) Held-to-Maturity (HTM) Investments

Investasi HTM adalah aset keuangan HTM investments are non-derivative


nonderivatif dengan pembayaran tetap atau financial assets with fixed or determinable
telah ditentukan dan jatuh temponya telah payments and fixed maturity that
ditetapkan, serta Perusahaan mempunyai the Company has the positive intention
intensi positif dan kemampuan untuk memiliki and ability to hold to maturity.
aset keuangan tersebut hingga jatuh tempo.

Setelah pengakuan awal, HTM diukur pada After initial recognition, HTM investments
biaya perolehan diamortisasi dengan are measured at amortized cost using
menggunakan metode suku bunga efektif. the effective interest method.

(iv) Aset Keuangan Tersedia Untuk Dijual (AFS) (iv) Available-for-Sale (AFS) Financial Assets

Aset keuangan AFS adalah aset keuangan AFS financial assets are non-derivative
nonderivatif yang ditetapkan sebagai tersedia financial assets that are designated as

22
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

untuk dijual atau yang tidak diklasifikasikan available for sale on initial recognition or
sebagai (a) pinjaman yang diberikan dan are not classified as (a) loans and
piutang, (b) investasi yang diklasifikasikan receivable, (b) held-to-maturity
dalam kelompok dimiliki hingga jatuh tempo, investment, or (c) financial assets at fair
atau (c) aset keuangan yang diukur pada nilai value through profit or loss.
wajar melalui laba rugi.

Setelah pengakuan awal, aset keuangan AFS After initial recognition, AFS financial
diukur pada nilai wajarnya. Keuntungan atau assets are measured at its fair value.
kerugian yang timbul dari perubahan nilai Gains or losses arising from a change in
wajar diakui dalam penghasilan komprehensif the fair value is recogniized on other
lain, kecuali untuk kerugian penurunan nilai comprehensive income, except for
dan keuntungan atau kerugian akibat impairment losses and foreign exchange
perubahan kurs, sampai aset keuangan gains and losses, until the financial
tersebut dihentikan pengakuannya. Pada saat assets is derecognized. At that time, the
itu, keuntungan atau kerugian kumulatif yang cumulative gains losses previously
sebelumnya diakui dalam penghasilan recognized in other comprehensive
komprehensif lain direklasifikasi dari ekuitas income shall be reclassified from equity to
ke laba rugi sebagai penyesuaian reklasifikasi. profit or loss as a reclassification
adjustment.

Investasi dalam instrumen ekuitas yang tidak Investment in equity instruments that do
memiliki harga kuotasian di pasar aktif dan not have a quoted market price in an
nilai wajarnya tidak dapat diukur secara andal active market and whose fair value
diukur pada biaya perolehan. cannot be reliably measured are
measured at cost.

Pada 30 Juni 2017 dan 31 Desember 2016, On June 30, 2017 and December 31,
Grup tidak mempunyai aset keuangan yang 2016, the Group has no financial assets
diklasifikasikan sebagai investasi saham classified as stock investments are
diukur dengan metode biaya. measured using the cost method.

Pengukuran Selanjutnya Liabilitas Subsequent Measurement of Financial


Keuangan Liabilities

Pengukuran selanjutnya liabilitas keuangan Subsequent measurement of financial


tergantung pada klasifikasinya pada saat liabilities depends on their classification on
pengakuan awal. Grup mengklasifikasikan initial recognition. The Group classifies
liabilitas keuangan dalam salah satu dari financial liabilities into one of the following
kategori berikut: categories:

(i) Liabilitas Keuangan yang Diukur pada Nilai (i) Financial Liabilities at Fair Value Through
Wajar Melalui Laba Rugi (FVTPL) Profit or Loss (FVTPL)

Liabilitas keuangan yang diukur pada FVTPL Financial liabilities at FVTPL are financial
adalah liabilitas keuangan yang dimiliki untuk liabilities held for trading or upon initial
diperdagangkan atau yang pada saat recognition it is designated as at fair value
pengakuan awal telah ditetapkan untuk diukur through profit or loss. Financial liabilities
pada nilai wajar melalui laba rugi. Liabilitas classified as held for trading if it is
keuangan diklasifikasikan dalam kelompok acquired or incurred principally for the
diperdagangkan jika diperoleh atau dimiliki purpose of selling and repurchasing it in
terutama untuk tujuan dijual atau dibeli kembali the near term, or it is a part of a portfolio
dalam waktu dekat, atau bagian dari portfolio of identified financial instruments that are
instrumen keuangan tertentu yang dikelola managed together and for which there is
bersama dan terdapat bukti mengenai pola evidence of a recent actual pattern of
ambil untung dalam jangka pendek aktual saat short-term profit taking, or it is a
ini, atau merupakan derivatif, kecuali derivatif derivative, except for a derivative that is a
yang ditetapkan dan efektif sebagai instrumen designated and effective hedging
lindung nilai. instrument.

23
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Setelah pengakuan awal, liabilitas keuangan After initial recognition, financial liabilities at
yang diukur pada FVTPL diukur pada nilai FVTPL are measured at its fair value.
wajarnya. Keuntungan atau kerugian yang Gains or losses arising from a change in
timbul dari perubahan nilai wajar diakui dalam the fair value are recognized in profit or
laba rugi. loss.
(ii) Liabilitas keuangan pada biaya perolehan (ii) Financial liabilities at amortized cost
diamortisasi
Liabilitas keuangan meliputi utang usaha dan Financial liabilities, which include trade and
lainnya, obligasi, bank dan pinjaman lainnya, other payables, bonds, bank and other
pada awalnya diukur pada nilai wajar, setelah borrowings, are initially measured at fair
dikurangi biaya transaksi, dan selanjutnya diukur value, net of transaction costs, and
pada biaya perolehan yang diamortisasi subsequently measured at amortized cost
menggunakan metode suku bunga efektif. using the effective interest method.
Penghentian Pengakuan Aset dan Liabilitas Derecognition of Financial Assets and
Keuangan Liabilities
Grup menghentikan pengakuan aset keuangan, jika The Group derecognize a financial asset when,
dan hanya jika, hak kontraktual atas arus kas yang and only when the contractual rights to the
berasal dari aset keuangan berakhir atau Grup cash flows from the financial asset expire or
mengalihkan hak kontraktual untuk menerima kas the Group transfer the contractual rights to
yang berasal dari aset keuangan atau tetap memiliki receive the cash flows of the financial asset or
hak kontraktual untuk menerima kas tetapi juga retains the contractual rights to receive the
menanggung kewajiban kontraktual untuk cash flows but assumes a contractual
membayar arus kas yang diterima tersebut kepada obligation to pay the cash flows to one or more
satu atau lebih pihak penerima melalui suatu recipients in an arrangement. If the Group
kesepakatan. Jika Grup secara substansial transfers substantially all the risks and rewards
mengalihkan seluruh risiko dan manfaat atas of ownership of the financial asset, the Group
kepemilikan aset keuangan, maka Grup derecognize the financial asset and recognize
menghentikan pengakuan aset keuangan dan separately as asset or liabilities any rights and
mengakui secara terpisah sebagai aset atau obligation created or retained in the transfer.
liabilitas untuk setiap hak dan kewajiban yang If the Group neither transfer nor retains
timbul atau yang masih dimiliki dalam pengalihan substantially all the risks and rewards of
tersebut. Jika Grup secara substansial tidak ownership of the financial asset and has
mengalihkan dan tidak memiliki seluruh risiko dan retained control, the Group continue to
manfaat atas kepemilikan aset keuangan tersebut recognize the financial asset to the extent of its
dan masih memiliki pengendalian, maka Grup continuing involvement in the financial asset.
mengakui aset keuangan sebesar keterlibatan If the Group retains substantially all the risks
berkelanjutan dengan aset keuangan tersebut. Jika and rewards of ownership of the financial
Grup secara substansial masih memiliki seluruh asset, the Group continue to recognize the
risiko dan manfaat atas kepemilikan aset keuangan, financial asset.
maka Grup tetap mengakui aset keuangan tersebut.
Grup menghentikan pengakuan liabilitas keuangan, The Group remove a financial liability from its
jika dan hanya jika, liabilitas keuangan tersebut statement of financial position when, and only
berakhir, yaitu ketika kewajiban yang ditetapkan when, it is extinguished, ie when the obligation
dalam kontrak dilepaskan atau dibatalkan atau specified in the contract is discharged or
kedaluwarsa. cancelled or expires.

Penurunan Nilai Aset Keuangan Impairment of Financial Assets

Pada setiap akhir periode pelaporan, Grup At the end of each reporting period, the Group
mengevaluasi apakah terdapat bukti objektif bahwa assess whether there is any objective evidence
aset keuangan atau kelompok aset keuangan that a financial asset or group of financial
mengalami penurunan nilai. Aset keuangan atau assets is impaired. A financial asset or group of
kelompok aset keuangan diturunkan nilainya dan financial assets is impared and impairment
kerugian penurunan nilai telah terjadi, jika dan lossess are incurred, if and only if, there is
hanya jika, terdapat bukti objektif mengenai objective evidence of impairment as a result of
penurunan nilai tersebut sebagai akibat dari satu one or more events that occured after the initial
atau lebih peristiwa yang terjadi setelah pengakuan recognition of the asset (loss event), and that
awal aset tersebut (peristiwa yang merugikan), dan loss event has an impact on the estimated
peristiwa yang merugikan tersebut berdampak pada future cash flows of the financial asset or group
estimasi arus kas masa depan dari aset keuangan of financial assets that can be reliably
atau kelompok aset keuangan yang dapat estimated.
diestimasi secara andal.

24
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Berikut adalah bukti objektif bahwa aset keuangan The following are objective evidence that a
atau kelompok aset keuangan mengalami financial asset or group of financial assets is
penurunan nilai: impaired:

(a) Kesulitan keuangan signifikan yang dialami (a) Significant financial difficulty of the issuer
penerbit atau pihak peminjam; or obligor;

(b) Pelanggaran kontrak, seperti terjadinya gagal (b) A breach of contract, such as default or
bayar atau tunggakan pembayaran pokok atau delinquency in interest or principal
bunga; payments;

(c) Terdapat kemungkinan bahwa pihak peminjam (c) It becoming probable that the borrower
akan dinyatakan pailit atau melakukan will enter bankruptcy or other financial
reorganisasi keuangan lainnya; atau reorganization; or

(d) Terdapat data yang dapat diobservasi yang (d) Observable data indicating that there is a
mengindikasikan adanya penurunan yang measurable decrease in the estimated
dapat diukur atas estimasi arus kas masa future cash flows from a group of financial
depan dari kelompok aset keuangan sejak assets since the initial recognition, such
pengakuan awal aset, seperti memburuknya as adverse changes in the payment
status pembayaran pihak peminjam atau status of borrowers or economic condition
kondisi ekonomi yang berkorelasi dengan that correlate with defaults.
gagal bayar.

Untuk investasi pada instrumen ekuitas, penurunan For investment in equity instrument, a
yang signifikan atau penurunan jangka panjang significant and prolonged decline in the fair
dalam nilai wajar instrumen ekuitas di bawah biaya value of the equity instrument below its cost is
perolehannya merupakan bukti objektif terjadinya an objective evidence of impairment.
penurunan nilai.

Jika terdapat bukti objektif bahwa kerugian If there is objective evidence that an
penurunan nilai telah terjadi atas pinjaman yang impairment loss has been incurred on loans
diberikan dan piutang atau investasi dimiliki hingga and receivable or held-to-maturity investments
jatuh tempo yang dicatat pada biaya perolehan carried at amortized cost, the amount of
diamortisasi, maka jumlah kerugian tersebut diukur impairment loss is measured as the difference
sebagai selisih antara jumlah tercatat aset dan nilai between the carrying amount of the financial
kini estimasi arus kas masa depan yang didiskonto asset and the present value of estimated future
menggunakan suku bunga efektif awal dari aset cash flows discounted at the financial asset’s
tersebut dan diakui pada laba rugi. original effective interest rate and recognized in
profit or loss.
Jika penurunan dalam nilai wajar atas aset When a decline in the fair value of an available-
keuangan tersedia untuk dijual telah diakui dalam for-sale financial asset has been recognized in
penghasilan komprehensif lain dan terdapat bukti other comprehensive income and there is
objektif bahwa aset tersebut mengalami penurunan objective evidence that the asset is impaired,
nilai, maka kerugian kumulatif yang sebelumnya the cumulative loss that had been recognized
diakui dalam penghasilan komprehensif lain in other comprehensive income shall be
direklasifikasi dari ekuitas ke laba rugi sebagai reclassified from equity to profit or loss as a
penyesuaian reklasifikasi meskipun aset keuangan reclassification adjustment even though the
tersebut belum dihentikan pengakuannya. Jumlah financial assets has not been derecognized.
kerugian kumulatif yang direklasifikasi adalah selisih The amount of the cumulative loss that is
antara biaya perolehan (setelah dikurangi reclassified are the difference between the
pelunasan pokok dan amortisasi) dan nilai wajar acquisition cost (net of any principal repayment
kini, dikurangi kerugian penurunan nilai aset and amortisation) and current fair value, less
keuangan yang sebelumnya telah diakui dalam laba any impairment loss on that financial asset
rugi. previously recognized in profit or loss.

Metode Suku Bunga Efektif The Effective Interest Method

Metode suku bunga efektif adalah metode yang The effective interest method is a method of
digunakan untuk menghitung biaya perolehan calculating the amortized cost of a financial
diamortisasi dari aset atau liabilitas keuangan (atau asset or a financial liability (or group of financial
kelompok aset atau liabilitas keuangan) dan metode assets or financial liabilities) and of allocating
untuk mengalokasikan pendapatan bunga atau the interest income or interest expense over

25
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

beban bunga selama periode yang relevan. Suku the relevant period. The effective interest rate
bunga efektif adalah suku bunga yang secara tepat is the rate that exactly discount estimated
mendiskontokan estimasi pembayaran atau future cash payments or receipts through the
penerimaan kas masa depan selama perkiraan expected life of the financial instrument or,
umur dari instrumen keuangan, atau jika lebih tepat, when appropriate, a shorter period to the net
digunakan periode yang lebih singkat untuk carrying amount of the financial asset or
memperoleh jumlah tercatat neto dari aset financial liability. When calculating the effective
keuangan atau liabilitas keuangan. Pada saat interest rate, the Group estimate cash flows
menghitung suku bunga efektif, Grup mengestimasi considering all contractual terms of the
arus kas dengan mempertimbangkan seluruh financial instrument, for example, prepayment,
persyaratan kontraktual dalam instrumen keuangan call and similar option, but shall not consider
tersebut, seperti pelunasan dipercepat, opsi beli future credit losses. The calculation includes all
dan opsi serupa lain, tetapi tidak fees and points paid or received between
mempertimbangkan kerugian kredit masa depan. parties to the contract that are an integral part
Perhitungan ini mencakup seluruh komisi dan of the effective interest rate, transaction costs,
bentuk lain yang dibayarkan atau diterima oleh and all other premiums or discounts.
pihak-pihak dalam kontrak yang merupakan bagian
takterpisahkan dari suku bunga efektif, biaya
transaksi, dan seluruh premium atau diskonto lain.

Reklasifikasi Reclassification

Grup tidak mereklasifikasi derivatif yang diukur The Group shall not reclassify a derivative out
pada nilai wajar melalui laba rugi selama derivatif of the fair value through profit or loss category
tersebut dimiliki atau diterbitkan dan tidak while it is held or issued and not reclassify any
mereklasifikasi setiap instrumen keuangan dari financial instrument out of the fair value through
diukur melalui laba rugi jika pada pengakuan awal profit or loss category if upon initial recognition
instrumen keuangan tersebut ditetapkan oleh Grup it was designated by the Group as at fair value
sebagai diukur pada nilai wajar melalui laba rugi. through profit or loss. The Group may
Grup dapat mereklasifikasi aset keuangan yang reclassifiy that financial asset out of the fair
diukur pada nilai wajar melalui laba rugi, jika aset value through profit or loss category if a
keuangan tidak lagi dimiliki untuk tujuan penjualan financial asset is no longer held for the purpose
atau pembelian kembali aset keuangan tersebut of selling or repurchasing it in the near term.
dalam waktu dekat. Grup tidak mereklasifikasi The Group shall not reclassify any financial
setiap instrumen keuangan ke diukur pada nilai instrument into the fair value through profit or
wajar melalui laba rugi setelah pengakuan awal. loss category after initial recognition.

Jika, karena perubahan intensi atau kemampuan If, as a result of a change in Group’s intention
Grup, instrumen tersebut tidak tepat lagi or ability, it is no longer appropriate to classify
diklasifikasikan sebagai investasi dimiliki hingga an investment as held to maturity, it shall be
jatuh tempo, maka investasi tersebut direklasifikasi reclassified as available for sale and
menjadi tersedia untuk dijual dan diukur kembali remeasured at fair value. Whenever sales or
pada nilai wajar. Jika terjadi penjualan atau reclassification of more than an insignificant
reklasifikasi atas investasi dimiliki hingga jatuh amount of held-to-maturity investments, any
tempo dalam jumlah yang lebih dari jumlah yang remaining held-to-maturity investments shall be
tidak signifikan, maka sisa investasi dimiliki hingga reclassified as available for sale, other than
jatuh tempo direklasifikasi menjadi tersedia untuk sales or reclassification that are so close to
dijual, kecuali penjualan atau reklasifikasi tersebut maturity or the financial asset’s call date, occur
dilakukan ketika aset keuangan sudah mendekati after all the financial asset’s original principal
jatuh tempo atau tanggal pembelian kembali, terjadi has been collected substantially through
setelah seluruh jumlah pokok telah diperoleh secara scheduled payments or prepayments, or are
substansial sesuai jadwal pembayaran atau telah attributable to an isolated event that is beyond
diperoleh pelunasan dipercepat; atau terkait dengan control, non-recurring, and could not have been
kejadian tertentu yang berada di luar kendali, tidak reasonably anticipated.
berulang, dan tidak dapat diantisipasi secara wajar.

26
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Saling Hapus Aset Keuangan dan Liabilitas Netting a Financial Asset and a Financial
Keuangan Liability

Aset keuangan dan liabilitas keuangan A financial asset and financial liability shall be
disalinghapuskan, jika dan hanya jika, Grup saat ini offset when and only when, the Group currently
memiliki hak yang dapat dipaksakan secara hukum has a legally enforceable right to net off
untuk melakukan saling hapus atas jumlah yang the recognized amount; and intends either to
telah diakui tersebut; dan berintensi untuk settle on a net basis, or to realise the asset and
menyelesaikan secara neto atau untuk settle the liability simultaneously.
merealisasikan aset dan menyelesaikan
liabilitasnya secara simultan.

Pengukuran Nilai Wajar Fair Value Measurement

Nilai wajar adalah harga yang akan diterima untuk Fair value is the price that would be received to
menjual suatu aset atau harga yang akan dibayar sell an asset or paid to transfer a liability in an
untuk mengalihkan suatu liabilitas dalam transaksi orderly transaction between market participants
teratur antara pelaku pasar pada tanggal at the measurement date.
pengukuran.

Nilai wajar aset dan liabillitas keuangan diestimasi The fair value of financial assets and financial
untuk keperluan pengakuan dan pengukuran atau liabilities must be estimated for recognition and
untuk keperluan pengungkapan. measurement or for disclosure purposes.

Nilai wajar dikategorikan dalam level yang berbeda Fair values are categorised into different levels
dalam suatu hirarki nilai wajar berdasarkan pada in a fair value hierarchy based on the degree to
apakah input suatu pengukuran dapat diobservasi which the inputs to the measurement are
dan signifikansi input terhadap keseluruhan observable and the significance of the inputs to
pengukuran nilai wajar: the fair value measurement in its entirety:

(i) Harga kuotasian (tanpa penyesuaian) di pasar (i) Quoted prices (unadjusted) in active
aktif untuk aset atau liabilitas yang identik yang markets for identical assets or liabilities that
dapat diakses pada tanggal pengukuran can be accessed at the measurement date
(Level 1). (Level 1).

(ii) Input selain harga kuotasian yang termasuk (ii) Inputs other than quoted prices included in
dalam Level 1 yang dapat diobservasi untuk Level 1 that are observable for the assets
aset atau liabilitas, baik secara langsung or liabilities, either directly or indirectly
maupun tidak langsung (Level 2). (Level 2).

(iii) Input yang tidak dapat diobservasi untuk aset (iii) Unobservable inputs for the assets or
atau liabilitas (Level 3). liabilities (Level 3).

Dalam mengukur nilai wajar aset atau liabilitas, When measuring the fair value of an asset or a
Grup sebisa mungkin menggunakan data pasar liability, the Group uses market observable data
yang dapat diobservasi. Apabila nilai wajar aset to the extent possible. If the fair value of an
atau liabilitas tidak dapat diobservasi secara asset or a liability is not directly observable, the
langsung, Grup menggunakan teknik penilaian yang Group uses valuation techniques that
sesuai dengan keadaannya dan memaksimalkan appropriate in the circumstances and maximizes
penggunaan input yang dapat diobservasi yang the use of relevant observable inputs and
relevan dan meminimalkan penggunaan input yang minimizes the use of unobservable inputs.
tidak dapat diobservasi.

Perpindahan antara level hirarki wajar diakui oleh Transfers between levels of the fair value
Grup pada akhir periode pelaporan dimana hierarchy are recognised by the Group at
perpindahan terjadi. the end of the reporting period during which
the change occurred.

27
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

h. Kas dan Setara Kas h. Cash and Cash Equivalent

Kas dan setara kas termasuk kas, kas di bank Cash and cash equivalents are cash on hand,
(rekening giro), dan deposito berjangka yang jatuh cash in banks (demand deposits) and time
tempo dalam jangka waktu tiga bulan atau kurang deposits with maturity periods of three months
pada saat penempatan yang tidak digunakan or less at the time of placement that are not
sebagai jaminan atau tidak dibatasi used as collateral or are not restricted.
penggunaannya.

i. Investasi Jangka Pendek i. Short-Term Investment

Deposito berjangka yang jatuh temponya kurang Time deposits with maturity less than three
dari tiga bulan pada saat penempatan namun months on the date of placement and pledged
dijaminkan, atau telah ditentukan penggunaannya as collateral, or restricted and time deposits
dan deposito berjangka yang jatuh temponya lebih with maturity of more than three months on the
dari tiga bulan setelah tanggal penempatan date of placement are presented as short-term
disajikan sebagai investasi jangka pendek. Deposito investment. The time deposits are presented
berjangka disajikan berdasarkan nilai nominal. using par value.

j. Piutang Retensi j. Retention Receivables

Piutang retensi merupakan piutang Grup kepada Retention receivable represents the Group’s
pemberi kerja yang akan dilunasi setelah receivable from owner of the project which will
penyelesaian kontrak atau pemenuhan kondisi yang be paid after completion of the contract or
ditentukan kontrak. Piutang retensi dicatat pada fulfillment of certain condition in the contract.
saat pemotongan sejumlah persentase tertentu dari Retention receivable is recorded when certain
setiap tagihan termin untuk ditahan oleh pemberi percentage deduction is applied in every
kerja sampai suatu kondisi setelah penyelesaian account receivable’s claim which retained by
kontrak dipenuhi. the owner of project up to certain condition
after completion of the contract has been met.

k. Tagihan Bruto kepada Pengguna Jasa k. Gross Amount Due from Customers

Tagihan bruto kepada pemberi kerja merupakan Gross amount due from customers represents
piutang Grup yang berasal dari pekerjaan kontrak the Group’s receivable originated from
konstruksi yang dilakukan namun pekerjaan yang construction contract in progress. Gross
dilakukan masih dalam pelaksanaan. Tagihan bruto amount due from customers is presented as
disajikan sebesar selisih antara biaya yang terjadi the net amount of costs incurred plus
ditambah laba yang diakui dikurangi dengan recognized profits, less the sum of recognized
kerugian yang diakui dan termin. losses and progress billings.

Tagihan bruto diakui sebagai pendapatan sesuai Gross amount due from customers is
dengan metode persentase penyelesaian yang recognized as revenue based on
dinyatakan dalam berita acara penyelesaian the percentage of completion method which is
pekerjaan, dimana faktur belum dapat ditagihkan stated on the certificate of work completion,
karena perbedaan antara tanggal berita acara while the invoice is still unbilled due to the
kemajuan (progress) fisik dengan pengajuan difference between the date of physical
penagihan pada tanggal laporan posisi keuangan progress certificates and the submission of
konsolidasian. billing on the consolidated statement of financial
position date.

l. Biaya Dibayar Dimuka l. Prepaid Expenses

Biaya dibayar dimuka merupakan biaya yang telah Prepaid expenses are costs that have been
dibayar namun pembebanannya baru akan paid but will be incurred future periods, such as
dilakukan pada periode yang akan datang, seperti prepaid insurance premiums, prepaid interest
premi asuransi dibayar dimuka, bunga dibayar and rent paid in advance. Prepaid expenses are
dimuka, dan sewa dibayar dimuka. Biaya dibayar amortized over the periods benefit using the
dimuka diamortisasi sesuai dengan masa straight-line method.
manfaatnya dengan menggunakan metode garis
lurus.

28
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

m. Persediaan m. Inventories

Persediaan dinyatakan berdasarkan jumlah Inventories are carried at the lower of cost and
terendah antara biaya perolehan dan nilai realisasi net realizable value. The cost of inventories
neto. Biaya perolehan terdiri dari seluruh biaya lain comprise all costs incurred in bringing the
yang timbul sampai persediaan berada dalam inventories to their present location and
kondisi dan lokasi saat ini. Biaya perolehan condition. Cost is determined using first-in
ditentukan dengan metode masuk pertama keluar first-out method (FIFO). Net realizable value is
pertama (FIFO). Nilai realisasi neto merupakan the estimated selling price in the ordinary
taksiran harga jual dalam kegiatan usaha biasa course of business less the estimated costs of
dikurangi estimasi biaya penyelesaian dan estimasi completion and the estimated costs necessary
biaya yang diperlukan untuk membuat penjualan. to make the sale.

Persediaan tanah kavling untuk usaha sarana Inventory of lots of land for housing are
perumahan dinilai dengan menggunakan harga beli recorded at costs using the acquisition cost
ditambah dengan biaya lain-lain yang dikeluarkan plus other expenditures incurred to make the
sampai dengan tanah tersebut siap dijual land are ready for sale (with certificate).
(bersertifikat).

Persediaan material dinyatakan sebesar nilai yang Material inventories are stated at the lower of
lebih rendah antara harga perolehan dengan nilai the cost or net realizable value and precast
realisasi bersih dan persediaan precast pun inventories using the same method.
menggunakan metode yang sama.

Penyisihan penurunan nilai persediaan dibentuk Allowance for decrease in value of inventory is
berdasarkan penelaahan fisik persediaan pada provided based on the physical check of
akhir periode. inventory at the end of the period.

n. Aset Tetap n. Fixed Assets

Aset tetap tanah dan bangunan dinyatakan Land and buildings are stated at their revalued
berdasarkan nilai revaluasi yang merupakan nilai amounts, being the fair value at the date of
wajar pada tanggal revaluasi dikurangi akumulasi revaluation, less any subsequent accumulated
penyusutan dan akumulasi rugi penurunan nilai depreciation and subsequent accumulated
yang terjadi setelah tanggal revaluasi. Revaluasi impairment losses. Revaluation is made with
dilakukan dengan keteraturan yang memadai untuk sufficient regularity to ensure that the carrying
memastikan bahwa jumlah tercatat tidak berbeda amount does not differ materially from the
secara material dari jumlah yang ditentukan dengan amount determined using fair value at
menggunakan nilai wajar pada tanggal laporan. the reporting date.

Kenaikan yang berasal dari revaluasi tanah dan Any revaluation increase arising on the
bangunan diakui pada penghasilan komprehensif revaluation of such land and buildings is
lain dan terakumulasi dalam ekuitas pada bagian recognized in other comprehensive income
surplus revaluasi, kecuali sebelumnya penurunan and accumulated in equity under revaluation
revaluasi atas aset yang sama pernah diakui dalam surplus, except to the extent that it reverses a
laba rugi, dalam hal ini kenaikan revaluasi hingga revaluation decrease, for the same asset
sebesar penurunan nilai aset akibat revaluasi which was previously recognized in profit or
tersebut, dikreditkan dalam laba rugi. Penurunan loss, in which case the increase is credited to
jumlah tercatat yang berasal dari revaluasi tanah profit or loss to the extent of the decrease
dan bangunan dibebankan dalam laba rugi apabila previously charged. A decrease in carrying
penurunan tersebut melebihi saldo surplus revaluasi amount arising on the revaluation of such land
aset yang bersangkutan, jika ada. and buildings is charged to profit or loss to the
extent that it exceeds the balance, if any.

Surplus revaluasi tanah dan bangunan yang telah The revaluation surplus in respect of land and
disajikan dalam ekuitas dipindahkan langsung ke buildings is directly transferred to retained
saldo laba pada saat aset tersebut dihentikan earnings when the asset is derecognized.
pengakuannya.

Aset tetap tanah tidak disusutkan. Sedangkan aset Land are not depreciated. While building
tetap gedung disusutkan dengan metode garis lurus assets are depreciated using the straight-line
selama masa manfaat aset tersebut, sebagai method based on their estimated useful lives,
berikut: as follows:

29
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Masa Manfaat/
Useful Lives

Gedung dan Pabrik 20 Tahun/ Year Buildings and Plants

Aset tetap kecuali tanah dan bangunan dinyatakan Fixed assets except for land and buildings are
berdasarkan biaya perolehan dikurangi akumulasi accounted for using cost less accumulated
penyusutan, dan akumulasi penurunan nilai jika depreciation and accumulated impairment
ada, dan disusutkan dengan menggunakan metode losses, if any, and depreciated using the
saldo menurun berganda selama taksiran masa double - declining method based on the
manfaat ekonomis aset tetap sebagai berikut: estimated usefull life of the fixed assets as
follows:

Masa Manfaat/
Useful Lives

Kendaraan 8 Tahun/ Year Vehicles


Perlengkapan Kantor 2 - 8 Tahun/ Year Office Supplies
Peralatan Proyek 4 - 16 Tahun/ Year Project Equipment

Grup melakukan perubahan kebijakan akuntansi The Group changed its accounting policy on
aset tetap untuk kelompok tanah dan bangunan fixed assets classified as land and buildings in
pada tahun 2015, semula dicatat berdasarkan 2015, which previously accounted for using the
metode harga perolehan, menjadi metode revaluasi, cost method, to revaluatian model, which
yang dihitung oleh penilai independen (KJPP). appraised by an independent appraiser
Perubahan kebijakan akuntansi ini dilakukan (KJPP). The changes in the accounting
dengan tujuan agar laporan keuangan dapat policies was made for the purpose to represent
menggambarkan investasi Grup dalam aset tetap Group’s investment on land and buildings in
kelompok tanah dan bangunan dan perubahan the financial statements in accordance with
dalam investasi tersebut sesuai dengan nilai pasar their market value at the financial reporting
pada periode laporan keuangan (Catatan 16). date (Note 16).

Biaya perbaikan dan pemeliharaan dibebankan Cost of repairs and maintenance is charged to
pada laporan laba rugi pada saat terjadinya biaya - profit or loss as incurred, while the significant
biaya tersebut, sedangkan pengeluaran dalam expenditures for renewals and improvements
jumlah besar dan sifatnya meningkatkan kondisi are capitalized. All expenditures subsequent to
aset secara signifikan dikapitalisasi. Semua the purchasing of fixed assets would be added
pengeluaran setelah perolehan awal aset tetap (capitalized) on the carrying amount of the
akan ditambah (kapitalisasi) pada jumlah tercatat assets.
aset yang bersangkutan.

Jumlah tercatat aset tetap dihentikan The carrying amount of fixed assets is
pengakuannya pada saat dilepaskan atau saat tidak derecognized upon disposal or when no future
ada manfaat ekonomis masa depan yang economic benefits are expected from its use or
diharapkan dari penggunaan atau pelepasannya. disposal. Any profit or loss arising on
Laba atau rugi yang timbul dari penghentian derecognition of the asset (calculated as the
pengakuan aset (dihitung sebagai perbedaan difference between the net disposal proceeds
antara jumlah neto hasil pelepasan dan jumlah and the carrying amount of the asset) is
tercatat dari aset) dimasukkan dalam laba rugi pada included in the profit or loss for
periode/ tahun aset tersebut dihentikan the period/ year when the assets are
pengakuannya. derecognized.

Apabila suatu aset tetap tidak dipergunakan lagi When assets are not used or otherwise
atau dilepas, nilai tercatat dan akumulasi disposed of, the carrying costs and its’ related
penyusutannya dikeluarkan dari pencatatannya accumulated depreciation are removed from
sebagai aset tetap dan keuntungan atau kerugian the fixed assets account and any resulting gain
yang timbul dilaporkan dalam laba rugi tahun or loss is recorded or charged to profit or loss
berjalan. for the year.

30
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pada akhir periode/ tahun buku pelaporan, Grup At the end of reporting period/ year end,
melakukan penelaahan berkala atas masa manfaat the Group periodically reviews the useful lives
ekonomis aset, nilai residu, metode penyusutan, of the assets, asset’s residual value,
dan sisa umur pemakaian berdasarkan spesifikasi depreciation method and the remaining usage
teknis. expectation based on technical specification.

Aset dalam penyelesaian dinyatakan sebesar biaya Construction in progress is stated at cost, and
perolehan, dan akan dipindahkan ke aset tetap will be reclassified to the respective fixed
pada saat sudah selesai pembangunannya dan siap assets when completed and ready to use.
digunakan.

o. Properti Investasi o. Investment Properties

Properti investasi adalah properti (tanah atau Investment properties are properties (land or a
bangunan atau bagian dari suatu bangunan atau building or part of a building or both) held by
kedua-duanya) yang dikuasai oleh pemilik atau the owner or the lessee under a finance lease
penyewa melalui sewa pembiayaan untuk to earn rentals or for capital appreciation or
menghasilkan sewa atau untuk kenaikan nilai atau both, rather than for use in the production or
kedua-duanya, dan tidak untuk digunakan dalam supply of goods or services or for
produksi atau penyediaan barang atau jasa atau administrative purposes; or sale in the daily
untuk tujuan administratif; atau dijual dalam business activities.
kegiatan usaha sehari-hari.

Properti investasi diakui sebagai aset jika dan Investment property is recognized as an asset
hanya jika besar kemungkinan manfaat ekonomi when, and only when it is probable that the
masa depan yang terkait dengan properti investasi future economic benefits that are associated
akan mengalir ke entitas; dan biaya perolehan with the investment property will flow to
properti investasi dapat diukur dengan andal. the entity; and the cost of the investment
property can be measured reliably.
Properti investasi pada awalnya diukur sebesar An investment property shall be measured
biaya perolehan, meliputi harga harga pembelian initially at its cost, comprises its purchase price
dan setiap pengeluaran yang dapat diatribusikan and any directly attributable expenditure
secara langsung (biaya jasa hukum, pajak (professional fees for legal services, property
pengalihan properti dan biaya transaksi lain). Biaya transfer taxes and other transaction costs).
transaksi termasuk dalam pengukuran awal Transaction costs are included in the initial
tersebut. measurement.

Setelah pengakuan awal, Grup memilih After initial recognition, the Group choose to
menggunakan model nilai wajar dan mengukur use fair value model and measure all of its
seluruh properti investasi berdasarkan nilai wajar. investment property at fair value. A gain or loss
Keuntungan atau kerugian yang timbul dari arising from a change in the fair value of
perubahan nilai wajar properti investasi diakui investment property is recognized in profit or
dalam laba rugi pada periode terjadinya. loss for the period in which it arises.

Penentuan nilai wajar investasi didasarkan pada The fair value of investment property is based
penilaian oleh penilai independen yang mempunyai on a valuation by an independent valuer who
kualifikasi profesional yang telah diakui dan relevan holds a recognised and relevant professional
seta memiliki pengalaman terkini di lokasi dan qualification and has recent experience in the
kategori properti investasi yang dinilai. location and category of the investment
property being valued.

Pengalihan ke properti investasi dilakukan jika, dan Transfer to investment property made when,
hanya jika, terdapat perubahan penggunaan yang and only when, there is a change in use,
ditunjukkan dengan berakhirnya pemakaian oleh evidenced by end of owner-occupation and
pemilik dan dimulainya sewa operasi kepada pihak commencement of an operating lease to
lain. another party.

Pengalihan dari properti investasi dilakukan jika, Transfer from investment property made when,
dan hanya jika, terdapat perubahan penggunaan and only when, there is a change in use,
yang ditunjukkan dengan dimulainya penggunaan evidenced by commencement of owner-
oleh pemilik dan dimulainya pengembangan untuk occupation and commencement of
dijual. development with a view to sale.

31
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Properti investasi dihentikan pengakuannya pada An investment property is derecognized on


saat dilepaskan atau ketika tidak digunakan lagi disposal or when the investment property is
secara permanen dan tidak memiliki manfaat permanently withdrawn from use and no future
ekonomi masa depan yang diperkirakan dari economic benefits are expected from its
pelepasannya. Keuntungan atau kerugian yang disposal. Gains or losses arising from the
timbul dari penghentian atau pelepasan ditentukan retirement or disposal are determined as the
dari selisih antara hasil neto pelepasan dan jumlah difference between the net disposal proceeds
tercatat aset, dan diakui dalam laba rugi pada and the carrying amount of the asset, and are
periode terjadinya penghentian atau pelepasan. recognized in profit or loss in the period of the
retirement or disposal.

p. Aset Lain-lain p. Other Assets

Akun-akun yang tidak dapat digolongkan dalam Accounts that cannot be classified into current
aset lancar, investasi, maupun aset tidak berwujud assets, investment, or intangible assets are
disajikan dalam aset lain-lain. presented as other assets.

Beban tangguhan berupa hak atas tanah dicatat Deferred expense such as land right is
sebesar biaya perolehan hak atau biaya recorded at cost of acquisition or cost of
pembaharuan hak. Semua beban tangguhan terkait renewal right. Deferred expense of right is
hak diamortisasi sepanjang umur hukum hak atau amortized over useful life or economic life of
umur ekonomis aset tanah, yang mana yang lebih land, whichever is shorter.
pendek.

q. Perjanjian Konsesi Jasa q. Service Concession Arrangement

Grup telah menerapkan ISAK 16, “Perjanjian The Group has adopted ISAK 16, “Service
Konsesi Jasa” (ISAK 16) dan ISAK 22, “Perjanjian Concession Arrangement” (ISAK 16) and
Konsesi Jasa Pengungkapan” (ISAK 22). ISAK 22, “Service Concession Arrangement:
Disclosure” (ISAK 22).

ISAK 16 mengatur prinsip umum dalam pengakuan dan ISAK 16 determines the general principles in
pengukuran hak dan kewajiban terkait dengan perjanjian the recognition and measurement of rights and
konsesi jasa. ISAK 16 mengatur bahwa infrastruktur liabilities related to service concession
tidak diakui sebagai aset tetap operator (pihak penerima arrangement. ISAK 16 regulates that an operator
konsesi jasa) karena perjanjian jasa kontraktual tidak (concession right beneficiary) does not recognize
memberikan hak kepada operator untuk mengendalikan any infrastructure assets because the contractual
penggunaan infrastruktur jasa publik. Operator memiliki service arrangement does not convey the right to
akses untuk mengoperasikan infrastruktur dalam control the use of the public service infrastructure
menyediakan jasa publik untuk kepentingan pemberi to the operator. The operator has access to
konsesi sesuai dengan persyaratan yang ditentukan operate the infrastructure to provide the public
dalam kontrak. service on behalf of the grantor in accordance with
the terms specified in the contract.

ISAK 22 memberikan panduan spesifik mengenai ISAK 22 provides specific guidance for
pengungkapan yang diperlukan atas perjanjian konsesi the required disclosures regarding the service
jasa. concession arrangement.

Grup membukukan perjanjian konsesi jasa sebagai The Group accounts for its service concession
model aset takberwujud karena memiliki hak (lisensi) arrangement under the intangible asset model as
untuk membebankan pengguna jasa publik. Pada saat it receives the right (license) to charge users of
pengakuan awal, aset konsesi dicatat pada nilai wajar public service. At initial recognition, concession
dari imbalan yang diterima atau akan diterima. Aset assets are recorded at the fair value of the benefit
konsesi ini adalah aset hak pengelolaan jalan tol yang received or to be received. These concession
akan diamortisasi selama sisa masa hak konsesi sejak assets are toll road concession rights which will be
tanggal pengoperasian ruas jalan tol. Selama masa amortized over the remaining concession period
konstruksi, akumulasi biaya perolehan dan konstruksi from the date of operation of the toll road. During
jalan tol diakui sebagai aset konsesi dalam the construction period, the accumulated toll road
penyelesaian. Amortisasi mulai dibebankan pada saat construction cost is recognized as concession
aset konsesi tersebut siap digunakan. assets in progress. The amortization of the cost
starts when the concession assets are ready to be
operated.

32
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

ISAK 16 mengatur prinsip umum dalam pengakuan ISAK 16 determines the general principles in
dan pengukuran hak dan kewajiban terkait dengan the recognition and measurement of rights and
perjanjian konsesi jasa. ISAK 16 mengatur bahwa liabilities related to service concession
infrastruktur tidak diakui sebagai aset tetap operator arrangement. ISAK 16 regulates that an
(pihak penerima konsesi jasa) karena perjanjian operator (concession right beneficiary) does
jasa kontraktual tidak memberikan hak kepada not recognize any infrastructure assets
operator untuk mengendalikan penggunaan because the contractual service arrangement
infrastruktur jasa publik. Operator memiliki akses does not convey the right to control the use of
untuk mengoperasikan infrastruktur dalam the public service infrastructure to
menyediakan jasa publik untuk kepentingan the operator. The operator has access to
pemberi konsesi sesuai dengan persyaratan yang operate the infrastructure to provide the public
ditentukan dalam kontrak. service on behalf of the grantor in accordance
with the terms specified in the contract.

ISAK 22 memberikan panduan spesifik mengenai ISAK 22 provides specific guidance for
pengungkapan yang diperlukan atas perjanjian the required disclosures regarding the service
konsesi jasa. concession arrangement.

Grup membukukan perjanjian konsesi jasa sebagai The Group accounts for its service concession
model aset takberwujud karena memiliki hak arrangement under the intangible asset model
(lisensi) untuk membebankan pengguna jasa publik. as it receives the right (license) to charge
Pada saat pengakuan awal, aset konsesi dicatat users of public service. At initial recognition,
pada nilai wajar dari imbalan yang diterima atau concession assets are recorded at the fair
akan diterima. Aset konsesi ini adalah aset hak value of the benefit received or to be received.
pengelolaan jalan tol yang akan diamortisasi These concession assets are toll road
selama sisa masa hak konsesi sejak tanggal concession rights which will be amortized over
pengoperasian ruas jalan tol. Selama masa the remaining concession period from the date
konstruksi, akumulasi biaya perolehan dan of operation of the toll road. During
konstruksi jalan tol diakui sebagai aset konsesi the construction period, the accumulated toll
dalam penyelesaian. Amortisasi mulai dibebankan road construction cost is recognized as
pada saat aset konsesi tersebut siap digunakan. concession assets in progress.
The amortization of the cost starts when
the concession assets are ready to be
operated.

Aset konsesi akan dihentikan pengakuannya pada The concession assets are derecognized at
saat berakhirnya masa konsesi. Tidak akan ada the end of the concession period. There will be
keuntungan atau kerugian saat penghentian no gain or loss upon derecognition as
pengakuan karena aset konsesi diharapkan telah the concession assets which are expected to
diamortisasi secara penuh, akan diserahkan kepada be fully amortized by then, will be handed over
Badan Pengatur Jalan Tol (BPJT) tanpa syarat. to the Badan Pengatur Jalan Tol (BPJT) for no
consideration.

Aset konsesi yang diberikan kepada Grup dapat Concession asset granted to the Group are
dipindahkan dengan persetujuan Pemerintah/ transferrable with approval from
BPJT. Aset konsesi ini akan diserahkan ke the Government/ BPJT. These concession
Pemerintah/ BPJT pada saat akhir masa konsesi right assets will be transferred to the
dan, pada saat itu, seluruh akun yang berhubungan Government/ BPJT at the end of the
dengan aset konsesi akan dihentikan concession period and, at such time, all
pengakuannya. accounts related to the concession rights
assets will be derecognized.

Selama periode hak pengusahaan jalan tol, aset During the toll road concession rights period,
hak pengusahaan jalan tol dapat dikeluarkan dari the concession rights assets may be
laporan posisi keuangan konsolidasian Grup jika derecognized from the consolidated statement
jalan tol diserahkan (dikuasakan) kepada pihak lain of financial position of the Group if the toll road
atau Pemerintah/ BPJT mengubah status jalan tol is transferred to another party or
menjadi jalan non-tol atau tidak ada manfaat the Government/BPJT has changed the status
ekonomi yang dapat diharapkan dari of the toll road to non-toll road or if there is no
penggunaannya. Keuntungan atau kerugian yang economic benefit expected from usage of the
timbul dari penghentian atau pelepasan asset toll road. Gain or loss from discontinuance or
konsesi diakui sebagai keuntungan atau kerugian disposal of concession assets is recognized in
dalam laporan laba rugi dan penghasilan the statement of profit or loss and other
komprehensif lain konsolidasian. consolidated comprehensive income.

33
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Selain itu, Grup mengakui dan mengukur In addition, the Group recognizes and
pendapatan konstruksi sesuai dengan PSAK 34 measures construction revenue in accordance
(Revisi 2010), “Kontrak Konstruksi” (PSAK 34) dan with SFAS 34 (Revised 2010), “Construction
PSAK 23, “Pendapatan”, untuk jasa yang Contracts” (SFAS 34) and SFAS 23,
dilakukannya. Ketika Grup menyediakan jasa “Revenue”, for the services it performs. When
konstruksi atau peningkatan kemampuan, imbalan the Group provides construction services or
yang diterima atau akan diterima oleh Grup diakui upgrades services, the consideration received
pada nilai wajar. or to be received by the Group is recognized at
its fair value.
Kontrak konstruksi meliputi seluruh biaya konstruksi Construction contract comprises all
pembangunan jalan tol atau peningkatan kapasitas the amounts of toll road construction costs or
jalan tol yang meliputi pengadaan tanah, studi toll road capacity improvement consisting of
kelayakan dan biaya-biaya lain yang berhubungan land acquisition cost, feasibility study cost and
langsung dengan pembangunan jalan tol, termasuk other costs that are directly attributable to the
biaya pembangunan jalan akses ke jalan tol, jalan toll road construction, including construction
alternatif dan fasilitas jalan umum yang disyaratkan, costs for access roads, alternative roads and
ditambah biaya pinjaman lain yang secara langsung required public road facilities, interest and
maupun tidak langsung digunakan untuk mendanai other borrowing costs, either directly or
proses pembangunan aset tersebut. Biaya pinjaman indirectly used for financing the development
dikapitalisasi sampai dengan saat proses of assets. These costs are capitalized until
pembangunan tersebut telah selesai dan asset the construction is completed and
konsesi telah siap untuk dioperasikan. the concession assets are ready to be
operated.

Grup mengakui biaya jasa konstruksi dan The Group recognizes construction services
peningkatan kemampuan asset konsesi sebagai and increased capacity of concession asset
aset tak berwujud dimana Grup menerima hak asintangible assets which the Group receives
(lisensi) untuk membebankan pengguna jasa publik. the rights (license) to charge users of public
Suatu hak untuk membebankan pengguna jasa services. A right to charge users of public
publik bukan merupakan hak tanpa syarat untuk services is not an unconditional right to receive
menerima kas karena jumlahnya bergantung pada cash because the amounts depend on the
sejauh mana publik menggunakan jasa. Selama extent of public using the service. During the
periode konstruksi, Grup mencatat aset tak construction period, the Group records
berwujud dan mengakui pendapatan dan biaya intangible assets, and recognizes revenues
konstruksi sesuai dengan kontraknya. Biaya and costs of construction in accordance with
konstruksi merupakan nilai dari jumlah perolehan the contract. Construction cost is the value of
kontrak konstruksi. acquisition the construction contract.
Biaya bunga dan biaya pinjaman lainnya, seperti Interest and other borrowing costs, such as
diskonto baik yang secara langsung ataupun tidak discount fees on loans either directly or
langsung digunakan untuk mendanai proses indirectly used in financing the construction of
pembangunan asset kualifikasian (qualifying a qualifying asset, are capitalized up to the
assets), dikapitalisasi sampai saat proses date when the construction is completed. For
pembangunannya selesai. Untuk pinjaman yang borrowings directly attributable to a qualifying
dapat dihubungkan secara langsung dengan suatu asset, the amount allowed to be capitalized is
aset tertentu, jumlah yang dapat dikapitalisasi determined as the actual borrowing costs
adalah sebesar biaya pinjaman yang terjadi dalam incurred during the period, less any investment
periode berjalan, dikurangi dengan penghasilan income earned from the temporary investment
investasi sementara dari pinjaman tersebut. of such borrowings.

Provisi Pelapisan Jalan Tol Provision for Toll Road Overlay


Dalam pengoperasian jalan tol, Grup mempunyai In operating toll roads, the Group is obliged to
kewajiban untuk menjaga kualitas sesuai dengan maintain quality in accordance with the SPM
SPM (Standar Pelayanan Minimum) yang (Minimum Service Standards) established by
ditetapkan oleh Kementerian Pekerjaan Umum the Ministry of Public Works of the Republic of
Republik Indonesia, yaitu antara lain dengan Indonesia, i.e., by perfoming toll road overlay
melakukan pelapisan ulang jalan tol secara berkala. regularly. The cost of this overlay is
Biaya pelapisan ini akan dicadangkan secara periodically provided based on estimated
berkala berdasarkan estimasi penggunaan jalan tol utilization of toll road by customers. The
oleh pelanggan. Provisi pelapisan ulang jalan tol estimated net provision for toll road overlay is
diukur dengan nilai kini atas estimasi manajemen discounted to its present value that reflects
terhadap pengeluaran yang diperlukan untuk management estmates againt cost incurred to
menyelesaikan liabilitas kini. settle current provision.

34
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Biaya Pinjaman Borrowing Costs

Biaya pinjaman yang dapat diatribusikan langsung Borrowing costs directly attributable to the
dengan perolehan, pembangunan atau pembuatan acquisition, construction or production of an
aset yang membutuhkan waktu yang cukup lama asset that necessarily takes a substantial
untuk persiapan digunakan sesuai tujuannya atau period of time to get ready for its intended use
dijual dikapitalisasi sebagai bagian dari biaya aset. or sale are capitalized as part of the cost of
Semua biasa pinjaman lainnya diakui sebagai the asset. All other borrowing costs are
beban pada periode terjadi. Biaya pinjaman terdiri expensed in the period they occur. Borrowing
dari biaya bunga dan biaya lain yang ditanggung costs consist of interest and other costs that
oleh Grup sehubungan dengan peminjaman dana. the Group incurs in connection with the
borrowing of funds.

Kapitalisasi biaya pinjaman dimulai pada saat Capitalization of borrowing costs commences
aktivitas yang diperlukan untuk mempersiapkan when the activities to prepare the qualifying
aset agar dapat digunakan sesuai dengan asset for its intended use are in progress and
maksudnya, dan pengeluaran untuk aset the expenditures for the qualifying asset and
kualifikasian dan biaya pinjamannya telah terjadi. the borrowing costs have been incurred.
Kapitalisasi biaya pinjaman dihentikan pada saat Capitalization of borrowing costs ceases when
selesainya secara substansi seluruh aktivitas yang substantially all the activities necessary to
diperlukan untuk mempersiapkan aset kualifikasian prepare the qualifying asset for its intended
sesuai maksud penggunaannya selesai secara use are substantially completed.
substansial.

Aset jalan tol terdiri dari jalan dan jembatan, Toll road assets consisting of roads and
gerbang dan bangunan pelengkap jalan tol dan bridges, gates and complementary building toll
sarana pelengkap jalan tol dicatat sebagai aset hak roads and toll supplementary facilities are
pengusahaan jalan tol yang dinyatakan sebesar recorded as toll road concession rights which
nilai wajar pada tanggal revaluasian dikurangi are stated at Fair Value at the date assets or
akumulasi penyusutan dan akumulasi rugi revaluation less accumulated depreciation and
penurunan nilai yang terjadi setelah tanggal accumulated impairment losses that occur
revaluasi. after the date of revaluation.

Amortisasi aset jalan dan jembatan dilakukan Amortization of assets roads and bridges were
dengan menggunakan metode unit produksi (jumlah calculated using the unit of production (the
lalu lintas kendaraan kendaraan) selama masa hak amount of vehicle traffic vehicles) during the
pengusahaan jalan tol (masa konsesi). Sedangkan period of the concession (concession period).
aset hak pengusahaan jalan tol selain jalan dan While the toll road concession rights assets
jembatan diamortisasi selama periode yang lebih other than roads and bridges are amortized
pendek antara masa hak pengusahaan jalan tol over the shorter period between the period of
(masa konsesi) dan umur manfaat aset. concession (concession period) and the useful
life of the asset.

Aset tak berwujud dihentikan pengakuannya jika Intangible assets are derecognized when
dilepas atau ketika tidak terdapat lagi manfaat removed or when there are no further future
ekonomi masa depan yang diperkirakan dari economic benefits are expected from its use or
penggunaannya atau pelepasannya. Keuntungan disposal. Gains or losses arising from
atau kerugian yang muncul dari penghentian derecognition of an intangible asset is
pengakuan aset tak berwujud ditentukan sebagai determined as the difference between the net
selisih antara hasil neto pelepasan (jika ada) dan disposal proceeds (if any) and the carrying
jumlah tercatat aset. Keuntungan atau kerugian amount of assets. Gains or losses are
diakui dalam laba rugi ketika aset tersebut recognized in profit or loss when the asset is
dihentikan pengakuannya. Keuntungan diakui derecognized. Gains are recognized as other
sebagai pendapatan lain-lain. income.

Pada tanggal 25 Januari 2010 dan tanggal 20 Juni On January 25, 2010 and June 20, 2016,
2016, Ruas Kanci –Pejagan, Jawa Barat dan Jawa segment Kanci - Pejagan, West Java and
Tengah dan Ruas Pejagan-Pemalang, telah Central Java Segment Pejagan-Pemalang, has
beroperasi secara komersial. Amortisasi Hak been in commercial operation. Amortization of
Pengusahaan Jalan Tol dihitung sampai Toll Road Concession Rights are calculated
berakhirnya hak konsesi jalan tol hingga 28 Mei until the end of the toll road concession rights
2041. up to May 28, 2041.

35
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

r. Penurunan Aset Non-Keuangan r. Impairment of Non-Financial Assets

Pada setiap akhir periode pelaporan, Grup akan At the end of the reporting period, the Group
melakukan penilaian apakah terdapat indikasi aset will assess whether there is an indication of
mengalami penurunan nilai. Jika terdapat indikasi assets impairment. If such indication exists,
tersebut, maka Grup mengestimasi jumlah the Group estimates the recoverable amount
terpulihkan suatu aset atau unit penghasil kas of an asset or cash-generating unit is the
adalah jumlah yang lebih tinggi antara nilai wajar higher amount between the fair value less
dikurangi biaya untuk menjual dan nilai pakainya. costs to sell and value in use. If the
Jika jumlah terpulihkan suatu aset lebih kecil dari recoverable amount of an asset is less than its
nilai tercatatnya, nilai tercatat aset harus ditentukan carrying amount, the carrying amount of an
menjadi sebesar jumlah terpulihkan. Kerugian asset should be determined by the recoverable
penurunan nilai diakui segera dalam laba atau rugi. amount. Impairment loss is recognized
immediately in profit or loss.

Pemulihan rugi penurunan nilai aset yang telah Recovery of impairment losses of assets which
diakui periode sebelumnya dicatat jika terdapat has been recognized in prior periods are
indikasi penurunan nilai aset tersebut sudah tidak recorded when there is indication of
ada lagi atau menurun. Pemulihan rugi penurunan impairment of the asset no longer exists or
nilai aset diakui dalam laba atau rugi. Namun decreases. Recovery of impairment losses of
demikian, kenaikan nilai tercatat aset karena assets recognized in the profit or loss.
pemulihan rugi penurunan nilai hanya diakui However, the increase in the carrying value of
sepanjang tidak melebihi nilai tercatat yang assets due to the recovery of an impairment
ditentukan (setelah dikurangi penyusutan dan loss is recognized only if it is not exceed the
amortisasi) jika rugi penurunan nilai aset tidak carrying amount that would have been
diakui pada tahun sebelumnya. determined (after deducting depreciation and
amortization) if no impairment losses of assets
recognized in prior years.
s. Utang Bruto kepada Subkontraktor s. Gross Amount Due to Subcontractors

Utang bruto kepada subkontraktor merupakan Gross amount due to subcontractors


utang prestasi kerja subkontraktor yang belum represents uncertified subcontractor’s working
diberitaacarakan, baik dari subkontraktor atau progress, either from subcontractor or
material yang diakui sebagai prestasi karena belum materials which are recognized as progress as
memenuhi syarat pembayaran sesuai kontrak. it has not fulfilled the certain payment condition
Utang bruto kepada subkontraktor disajikan sebesar as stated in the contract. Gross amount due to
selisih antara biaya yang terjadi ditambah laba atau subcontractor is presented as the differences
dikurangi kerugian yang diakui. between costs occurred added by income or
deducted by realized loss.
t. Pengakuan Pendapatan dan Beban t. Revenue and Expense Recognition
Pendapatan kontrak dan biaya kontrak yang Contract revenue and contract cost associated
berhubungan dengan kontrak konstruksi diakui with the cosntruction contract are recognized
masing-masing sebagai pendapatan dan beban as revenue and expense respectively by
dengan memperhatikan tahap penyelesaian reference to the stage of completion of
aktivitas kontrak pada tanggal akhir periode the contract activity at the end of the reporting
pelaporan (metode persentase penyelesaian), yang period (percentage of completion method),
diukur berdasarkan kemajuan fisik pada tanggal which is measured based on the physical
akhir periode pelaporan yang dinyatakan dalam progress at the end of reporting period, which
berita acara penyelesaian pekerjaan eksternal. is stated on the minutes of external progress of
completion works.
Jika kemungkinan besar terjadi total beban kontrak If it is most likely to occur the total contract
akan melebihi pendapatan kontrak, maka taksiran expenses will exceed contract revenue,
rugi segera diakui sebagai beban. the estimated loss is recognized immediately
as an expense.
Pendapatan kontrak terdiri dari jumlah pendapatan Contract revenue comprises the initial amount
semula yang disetujui dalam kontrak dan of revenue that agreed in the contract and
penyimpangan dalam pekerjaan kontrak, klaim, dan variations in contract work, claims, and
pembayaran insentif sepanjang hal ini incentive payments to the extent that is
memungkinkan untuk menghasilkan pendapatan probable that it will result in revenue and can
dan dapat diukur dengan andal. be realiably measured.

36
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Biaya kontrak terdiri dari biaya yang berhubungan Contract cost comprises costs that related
langsung dengan kontrak, biaya yang dapat directly to the specific contract, costs that are
diatribusikan pada aktivitas kontrak secara umum attributable to contract activity in general and
dan dapat dialokasikan pada kontrak dan biaya lain can be allocated to the contract and such other
yang secara spesifik dapat ditagihkan ke pelanggan costs specifically can be billed to the customer
sesuai isi kontrak. under the terms of the contract.

Pendapatan dari usaha sarana papan (properti) Revenue from sales of housing is recognized
diakui dengan metode full accrual, yang dinyatakan by the full accrual method, as stated in
dalam PSAK 44 (Revisi 2010) “Akuntansi Aktivitas SFAS 44 (Revised 2010) “Accounting for Real
Pengembangan Real Estat”, jika seluruh syarat Estate Development Activies”, if all the
dipenuhi: following criterias are met:

(i) Pengikatan jual beli telah berlaku; (i) Binding sale and purchase has been
accepted;

(ii) Harga jual akan tertagih, dimana jumlah (ii) The sales price will be collectible, where in
pembayaran yang diterima sekurang-kurangnya the amount of payments already collected
telah mencapai 20% dari harga jual yang telah at least 20% of the agreed sale price;
disepakati;

(iii) Tagihan penjual terhadap pembeli pada masa (iii) The seller’s receivable from buyers will not
yang akan datang bebas dari subordinasi be subordinated in the future against
terhadap utang lain dari pembeli; dan another loan of the buyer; and

(iv) Penjual telah mengalihkan risiko dan manfaat (iv) The seller has transferred the risks and of
kepemilikan unit bangunan kepada pembeli ownership benefits to the buyer as follow:
sebagai berikut:

 Untuk penjualan bangunan rumah beserta  For the sale of houses with land, if the
tanah jika telah terjadi pengalihan seluruh seller has transferred to the buyer the
risiko dan manfaat kepemilikan yang risks and rewards of ownership in a
umum terdapat pada suatu transaksi transaction that is in substance a sale
penjualan, dan penjual selanjutnya tidak and seller does not have a substantial
mempunyai liabilitas atau terlibat lagi continuing involvement with the
secara signifikan dengan aset (properti) property. In this case the building is
tersebut. Dalam hal ini bangunan tersebut ready for use at least.
telah siap ditempati/digunakan.

 Untuk penjualan tanah yang pendirian  For sale of land where the building will
bangunannya akan dilaksanakan oleh be developed by the buyer when
pembeli jika selesainya pengembangan the development of the land is
lingkungan dimana tanah tersebut berada, completed whereas the seller is not
yaitu penjual tidak mempunyai liabilitas obligated to complete improvements of
yang signifikan lagi untuk menyelesaikan land sold or to construct other facilities
lingkungan seperti pematangan tanah applicable to the land sold,
yang dijual, pembangunan fasilitas yang development agreed facilities or
dijanjikan ataupun yang menjadi liabilitas liability and expenses of the seller in
dan beban penjual, sesuai dengan accordance with the agreement
perjanjian antara penjual dan pembeli yang between seller and buyer or related
bersangkutan atau ketentuan peraturan regulation.
perundang-undangan yang berlaku.

 Apabila semua persyaratan tersebut diatas  If all the above conditions are not met,
tidak dipenuhi, semua penerimaan uang all payment received from buyers are
yang berasal dari pelanggan dicatat recognized as unearned revenue using
sebagai uang muka dari pelanggan the deposit method, until all conditions
dengan menggunakan metode deposit, are met. Expenses are recognized
sampai semua persyaratan dipenuhi. when incurred, with accrual method
Beban diakui pada saat terjadinya, dengan basis.
menggunakan dasar akrual.

37
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pendapatan Tol Toll Revenues

Pendapatan Grup dari hasil pengoperasian jalan tol The Group’s revenues from toll road
diakui pada saat penjualan karcis tol. Pendapatan operations are recognized upon the sale of toll
tol dari hasil kerjasama pengoperasian jalan tol tickets. Revenue from profit sharing
dengan investor dengan kuasa penyelenggaraan arrangement between the Group and investor
diakui pada saat penjualan karcis tol setelah with operating rights are recognized when toll
dikurangi bagian investor tersebut. Pembayaran tickets are sold, net of investor’s share.
kepada investor tanpa kuasa penyelenggaraan Payments to investors without operating rights
dicatat sebagai angsuran liabilitas kerjasama are recorded as a mandatory installment under
operasi. Selisih antara jumlah pembayaran ini joint operation. The differences of total
dengan angsuran liabilitas kerjasaman operasi payments over mandatory installment under
dicatat sebagai beban atau penghasilan kerjasama joint operation is recorded as joint operation
operasi. expense or revenue.

u. Biaya Pinjaman u. Borrowing Costs

Biaya pinjaman yang dapat diatribusikan langsung Borrowing costs that are directly attributable to
dengan perolehan, pembangunan atau pembuatan the acquisition, construction or production of a
aset kualifikasian, dikapitalisasi sebagai bagian qualifying asset, are capitalized as part of
biaya perolehan aset tersebut. Biaya pinjaman the cost of asset. Other borrowing costs are
lainnya diakui sebagai beban pada saat terjadi. recognized as an expense when incurred.
Biaya pinjaman dapat mencakup beban bunga, Borrowing costs may include interest expense,
beban keuangan dalam sewa pembiayaan atau finance charges in respect of finance leases, or
selisih kurs yang berasal dari pinjaman dalam mata exchange differences arising from foreign
uang asing sepanjang selisih kurs tersebut currency borrowings to the extent that they are
diperlakukan sebagai penyesuaian atas biaya regarded as an adjustment to interest costs.
bunga.

Kapitalisasi biaya pinjaman dimulai pada saat Grup Capitalization of borrowing costs commences
telah melakukan aktivitas yang diperlukan untuk when the Group undertakes activities
mempersiapkan aset agar dapat digunakan atau necessary to prepare the asset for its intended
dijual sesuai dengan intensinya serta pengeluaran use or sale and expenditures for the asset and
untuk aset dan biaya pinjamannya telah terjadi. its borrowing costs has been incurred.
Kapitalisasi biaya pinjaman dihentikan ketika secara Capitalization of borrowing costs ceases when
substansial seluruh aktivitas yang diperlukan untuk substantially all the activities necessary to
mempersiapkan aset kualifikasian agar dapat prepare the qualifying assets for its intended
digunakan atau dijual sesuai dengan intensinya use or sale are complete.
telah selesai.

Konstruksi yang termasuk dalam perolehan aset Construction included in acquisition of certain
tertentu adalah proyek-proyek pre-financing yang assets is the pre-financing projects whose
pembangunannya membutuhkan waktu lebih dari constructions time is required more than one
satu tahun. year.

v. Kombinasi Bisnis v. Business Combinations

Kombinasi bisnis adalah suatu transaksi atau Business combination is a transaction or other
peristiwa lain dimana pihak pengakuisisi events in which an acquirer obtains control of
memperoleh pengendalian atas satu atau lebih one or more businesses. Business combination
bisnis. Kombinasi bisnis dicatat dengan is accounted for by applying the acquisition
menggunakan metode akuisisi. Imbalan yang method. The consideration transferred in a
dialihkan dalam suatu kombinasi bisnis diukur pada business combination is measured at fair
nilai wajar, yang dihitung sebagai hasil penjumlahan value, which is computed as the sum of the fair
dari nilai wajar seluruh aset yang dialihkan oleh value of the assets transferred by the Group at
Grup pada tanggal akuisisi, liabilitas yang diakui acquisition date, liabilities recognized by the
oleh Grup kepada pemilik sebelumnya dari pihak Group to former owners of the acquiree, and
yang diakuisisi, dan kepentingan ekuitas yang the equity interests issued by the Group in
diterbitkan oleh Grup dalam pertukaran exchange for control of the acquiree.
pengendalian dari pihak yang diakuisisi. Biaya- Acquisition-related costs are recognized as
biaya terkait akuisisi diakui sebagai beban pada expenses in the period in which the costs are
periode saat biaya tersebut terjadi dan jasa incurred and the services are rendered.
diterima.

38
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pada tanggal akuisisi, aset teridentifikasi yang At the acquisition date, the identifiable assets
diperoleh dan liabilitas yang diambil alih diakui pada acquired and the liabilities assumed are
nilai wajar kecuali untuk aset dan liabilitas tertentu recognized at the fair value except for certain
yang diukur sesuai dengan SAK yang relevan. assets and liabilities that are measured in
accordance with the relevant FASs.

Komponen kepentingan non-pengendali pada pihak Components of non-controlling interests of


yang diakuisisi diukur baik pada nilai wajar ataupun the acquiree are measured either at fair value
pada bagian proporsional instrumen kepemilikan or according to proportional share of the equity
yang ada dalam jumlah yang diakui atas aset neto instruments in the recognized amounts of
teridentifikasi dari pihak diakuisisi. the acquiree’s identifiable net assets.

Bila suatu kombinasi bisnis dilakukan secara When a business combination is achieved in
bertahap, kepemilikan terdahulu Grup atas pihak stages, the Group’s previously held equity
terakuisisi diukur kembali ke nilai wajar pada interest in the acquiree is remeasured at its fair
tanggal akuisisi dan keuntungan atau kerugiannya, value at the acquisition date and the resulting
jika ada, diakui dalam laba rugi. Apabila dalam gain or loss, if any, is recognized in profit or
periode sebelumnya, perubahan nilai wajar yang loss. If in prior periods, changes in fair value of
berasal dari kepentingan ekuitasnya sebelum its equity interest in the acquiree prior to the
tanggal akuisisi telah diakui dalam penghasilan acquisition date had been recognized in other
komprehensif lain, jumlah tersebut diakui dengan comprehensive income, that amount shall be
dasar yang sama sebagaimana dipersyaratkan jika recognized with the same basis as would be
Grup telah melepas secara langsung kepentingan required had the Group disposed of the
ekuitas yang dimiliki sebelumnya. previously held equity interest directly.

Jika akuntansi awal untuk kombinasi bisnis belum If the initial accounting for a business
selesai pada akhir periode pelaporan saat combination is incomplete by the end of the
kombinasi terjadi, Grup melaporkan jumlah reporting period in which the combination
sementara untuk pos-pos yang proses occurs, the Group reports provisional amounts
akuntansinya belum selesai dalam laporan for the items for which the accounting is
keuangannya. Selama periode pengukuran, Grup incomplete. During the measurement period,
menyesuaikan secara retrospektif jumlah the Group shall retrospectively adjust those
sementara tersebut, dan mengakui tambahan aset provisional amounts and recognize additional
atau liabilitas, untuk mencerminkan informasi baru assets or liabilities, to reflect new information
yang diperoleh tentang fakta dan keadaan yang ada obtained about facts and circumstances that
pada tanggal akuisisi, yang jika diketahui, akan existed as of the acquisition date that, if known,
menyebabkan pengakuan aset dan liabilitas yang would have resulted in the recognition of those
dimaksud pada tanggal tersebut. assets and liabilities as of that date.

Pada tanggal akuisisi, Grup mengakui goodwill At acquisition date, the Group recognizes
yang diukur sebagai selisih lebih antara (a) nilai goodwill which is measured as the excess of
gabungan dari imbalan yang dialihkan, jumlah (a) the aggregate of the consideration
setiap kepentingan non-pengendali, dan, jika transferred, the amount of any non-controlling
kombinasi bisnis dilakukan secara bertahap, nilai interest, and, in a business combination
wajar pada tanggal akuisisi kepentingan ekuitas achieved in stages, the acquisition-date fair
yang sebelumnya dimiliki Grup atas pihak yang value of the Group’s previously held equity
diakuisisi; dan (b) selisih jumlah dari aset interest in the acquiree; and (b) the net of the
teridentifikasi yang diperoleh dan liabilitas yang acquisition-date amounts of the identifiable
diambil alih pada tanggal akuisisi. Jika imbalan assets acquired and liabilities assumed. If this
tersebut kurang dari nilai wajar aset neto pihak consideration is lower than the fair value of the
yang diakuisisi, selisih tersebut diakui dalam net assets of the acquiree, the difference is
laporan laba rugi sebagai keuntungan dari akuisisi recognized in profit or loss as gain on bargain
setelah sebelumnya manajemen menilai kembali purchase after previously the management
apakah telah mengidentifikasi dengan tepat seluruh reassesses whether it has correctly identified
aset yang diperoleh dan liabilitas yang diambil alih all of the assets acquired and all of the
serta mengakui setiap aset atau liabilitas tambahan liabilities assumed and recognize any
yang dapat diidentifikasi dalam penelaahan additional assets or liabilities that are identified
tersebut. in that review.

39
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Setelah pengakuan awal, goodwill diukur pada Subsequent to initial recognition, goodwill is
jumlah tercatat dikurangi akumulasi kerugian measured at cost less any accumulated
penurunan nilai. Untuk tujuan pengujian penurunan impairment losses. For the purpose of
nilai, goodwill yang diperoleh dari suatu kombinasi impairment testing, goodwill acquired in a
bisnis, sejak tanggal akuisisi, dialokasikan kepada business combination, from the acquisition
setiap Unit Penghasil Kas dari Grup yang date, is allocated to each of the Group’s Cash
diperkirakan akan memberikan manfaat dari sinergi Generating Units that is expected to benefit
kombinasi bisnis tersebut, terlepas dari apakah aset from the synergies of the business
atau liabilitas lain dari pihak yang diakuisisi combination, regardless of whether other
ditempatkan dalam Unit Penghasil Kas tersebut. assets or liabilities of the acquiree are assigned
to those Cash Generating Units.

Jika goodwill telah dialokasikan pada suatu Unit If goodwill was allocated to a Cash Generating
Penghasil Kas dan operasi tertentu atas Unit Unit and certain operations on the Cash
Penghasil Kas tersebut dilepaskan, maka goodwill Generating Unit is disposed, the goodwill
yang terkait dengan operasi yang dilepaskan associated with the disposed operation is
tersebut termasuk dalam jumlah tercatat operasi included in the carrying amount of the
tersebut ketika menentukan keuntungan atau operation when determining the gain or losses
kerugian dari pelepasan. Goodwill yang dilepaskan on disposal. Disposed goodwill is measured on
tersebut diukur berdasarkan nilai relatif operasi the basis of relative values of the disposed
yang dihentikan dan porsi Unit Penghasil Kas yang operation and the portion of the Cash
ditahan. Generating Units retained.

Goodwill awalnya diukur pada harga perolehan, Goodwill is initially measured at historical cost,
yang merupakan selisih lebih dari nilai agregat the excess of the aggregate of the
imbalan yang dialihkan dan nilai yang diakui oleh consideration transferred and the amount
kepentingan non-pengendali dan nilai kepentingan recognized for non-controlling interests, and
ekuitas yang dimiliki sebelumnya, atas jumlah neto any previous interest held, over the net
dari aset teridentifikasi yang diperoleh dan liabilitas identifiable assets acquired and liabilities
yang diambil alih. Jika nilai wajar dari jumlah neto assumed. If the fair value of net assets
aset yang diakuisisi melebihi nilai agregat imbalan acquired is in excess of the aggregate
yang dialihkan, Grup menilai kembali apakah consideration transferred, the Group reassess
semua aset yang diakuisisi dan liabilitas yang whether it has correctly identified all of the
diambil alih sudah diidentifikasi dengan benar dan assets acquired and all of the liabilities
memeriksa prosedur yang digunakan untuk assumed, and reviews the procedures used to
mengukur nilai yang harus diakui pada tanggal measure the amounts to be recognized at the
akuisisi. Jika hasil penilaian kembali tersebut masih acquisition date. If the reassessment still
menghasilkan selisih lebih atas nilai wajar dari aset results in an excess of the fair value of net
neto diakuisisi atas nilai agregat imbalan yang assets acquired over the aggregate
dialihkan, maka keuntungan diakui pada laba rugi. consideration transferred, then the gain is
recognized in profit or loss.

Saat penentuan imbalan dari kombinasi bisnis When the determination of consideration from
termasuk imbalan kontinjensi, imbalan kontinjensi a business combination includes contingent
ini diukur pada nilai wajar saat tanggal akuisisi. consideration, it is measured at its fair value on
Imbalan kontinjensi diklasifikasikan sebagai ekuitas acquisition date. Contingent consideration is
atau liabilitas keuangan. Jumlah yang classified either as equity or a financial liability.
diklasifikasikan sebagai liabilitas keuangan Amounts classified as a financial liability are
selanjutnya diukur kembali pada nilai wajar dimana subsequently remeasured to fair value with
perubahan pada nilai wajar tersebut diakui dalam changes in fair value recognized in profit or
laba rugi atau ketika penyesuaian dicatat diluar loss when adjustments are recorded outside
periode pengukuran. Perubahan pada nilai wajar the measurement period. Changes in the fair
imbalan kontinjensi yang memenuhi persyaratan value of the contingent consideration that
sebagai penyesuaian periode pengukuran, qualify as measurement-period adjustments
disesuaikan secara retrospektif, dengan are adjusted retrospectively, with
penyesuaian terkait terhadap goodwill. corresponding adjustments made against
Penyesuaian periode pengukuran adalah goodwill. Measurement period adjustments are
penyesuaian yang timbul dari informasi tambahan adjustments that arise from additional
yang didapat selama periode pengukuran, yang information obtained during the measurement
tidak boleh melebihi satu tahun dari tanggal akusisi, period, which cannot exceed one year from the
tentang fakta dan kondisi yang ada pada saat acquisition date, about facts and circumstances
tanggal akuisisi. that existed at the acquisition date.

40
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Dalam suatu kombinasi bisnis yang dilakukan In a business combination achieved in stages,
secara bertahap, pihak pengakuisisi mengukur the acquirer remeasures its previously held
kembali kepentingan ekuitas yang dimiliki equity interest in the acquiree at its acquisition-
sebelumnya pada pihak diakuisisi pada nilai wajar date fair value and recognizes gain or loss
tanggal akuisisi dan mengakui keuntungan atau resulted, if any, in profit or loss.
kerugian yang dihasilkan, jika ada, dalam laba rugi.
Berdasarkan PSAK No. 38 (Revisi 2012), Based on SFAS No. 38 (Revised 2012),
“Kombinasi Bisnis Entitas Sepengendali”, “Common Control Business Combination”, the
pengalihan aset, liabilitas, saham dan instrumen transfer of assets, liabilities, shares and other
kepemilikan lain antara entitas sepengendali tidak ownership instruments among the companies
akan menghasilkan suatu laba atau rugi bagi under common control would not result in any
Perusahaan atau entitas individual yang berada gain or loss for the Company or individual
dalam grup yang sama. Oleh karena transaksi entity under same group. Since the
restrukturisasi antara entitas sepengendali tidak restructuring transaction between entities
mengubah substansi ekonomi atas kepemilikan under common control does not result in any
aset, liabilitas, saham atau instrumen kepemilikan changes of the economic substance of the
lain yang dipertukarkan, aset atau liabilitas yang ownership of assets, liabilities, shares or other
dialihkan harus dicatat berdasarkan nilai buku yang instruments of ownership, which are
menggunakan metode penyatuan kepentingan exchanged, assets or liabilities transferred are
(pooling-of-interest). Dalam pelaksanaan metode recorded at book value using the pooling-of-
penyatuan kepentingan, komponen-komponen interests method. In applying the pooling-of-
laporan keuangan selama restrukturisasi terjadi interests method, the components of the
disajikan seolah-olah restrukturisasi tersebut telah financial statements for the period during which
terjadi sejak awal periode penyajian paling awal. the restructuring occurred must be presented in
Selisih imbalan yang dibayar atau diterima dengan such a manner as if the restructuring has
nilai buku historis terkait dengan nilai tercatat dari occurred since the beginning of the earliest
kepentingan yang diperoleh, setelah period presented. The differences of
memperhitungkan dampak pajak penghasilan, consideration paid or received over the
diakui secara langsung di ekuitas dan disajikan carrying value of interest acquired, net of
sebagai “Tambahan Modal Disetor” pada bagian income tax effect, is directly recognized to
ekuitas di laporan posisi keuangan konsolidasian. equity and presented as “Additional Paid-in
Capital” under the equity section of the
consolidated statement of financial position.
Pada saat penerapan awal PSAK No. 38 (Revisi At the initial application of SFAS No. 38
2012), seluruh saldo Selisih Nilai Transaksi (Revised 2012), all balances of the Difference
Restrukturisasi Entitas Sepengendali In Value of Restructuring Transactions of
direklasifikasikan ke akun “Tambahan Modal Entities under Common Control was
Disetor” pada laporan posisi keuangan reclassified to “Additional Paid in Capital” in the
konsolidasian. consolidated statement of financial position.
w. Pajak Penghasilan w. Income Taxes
Beban pajak adalah jumlah gabungan pajak kini Tax expense is the aggregate amount included
dan pajak tangguhan yang diperhitungkan dalam in the determinination of profit or loss for the
menentukan laba rugi pada suatu periode. Pajak period in respect of current tax and deferred
kini dan pajak tangguhan diakui dalam laba rugi, tax. Current tax and deferred tax is recognized
kecuali pajak penghasilan yang timbul dari transaksi in profit or loss, except for income tax arising
atau peristiwa yang diakui dalam penghasilan from transactions or events that are recognized
komprehensif lain atau secara langsung di ekuitas. in other comprehensive income or directly in
Dalam hal ini, pajak tersebut masing-masing diakui equity. In this case, the tax is recognized in
dalam penghasilan komprehensif lain atau ekuitas. other comprehensive income or equity,
respectively.
Jumlah pajak kini untuk periode berjalan dan The amount of unpaid current tax for current
periode sebelumnya yang belum dibayar diakui and prior periods to be recognised as a
sebagai liabilitas. Jika jumlah pajak yang telah liabilities. If the amount already paid in respect
dibayar untuk periode berjalan dan periode-periode of current and prior periods exceeds the
sebelumnya melebihi jumlah pajak yang terutang amount due for those periods, the excess shall
untuk periode tersebut, maka kelebihannya diakui be recognised as an asset. Current tax
sebagai aset. Liabilitas (aset) pajak kini untuk liabilities (assets) for the current and prior
periode berjalan dan periode sebelumnya diukur periods shall be measured at the amount
sebesar jumlah yang diperkirakan akan dibayar expected to be paid to (recovered from) the
kepada (direstitusi dari) otoritas perpajakan, yang taxation authorities, using the tax rates (and tax
dihitung menggunakan tarif pajak (dan undang- laws) that have been enacted or substantively
undang pajak) yang telah berlaku atau secara enacted by the end of the reporting period.
substantif telah berlaku pada akhir periode
pelaporan.

41
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Manfaat terkait dengan rugi pajak yang dapat ditarik Tax benefits relating to tax loss that can be
untuk memulihkan pajak kini dari periode carried back to recover current tax of a
sebelumnya diakui sebagai aset. Aset pajak previous periods is recognized as an asset.
tangguhan diakui untuk akumulasi rugi pajak belum Deferred tax asset is recognized for the
dikompensasi dan kredit pajak belum dimanfaatkan carryforward of unused tax losses and unused
sepanjang kemungkinan besar laba kena pajak tax credit to the extent that it is probable that
masa depan akan tersedia untuk dimanfaatkan future taxable profit will be available against
dengan rugi pajak belum dikompensasi dan kredit which the unused tax losses and unused tax
pajak belum dimanfaatkan. credits can be utilized.

Seluruh perbedaan temporer kena pajak diakui A deferred tax liability shall be recognized for
sebagai liabilitas pajak tangguhan, kecuali all taxable temporary differences, except to all
perbedaan temporer kena pajak yang berasal dari: taxable temporary differences arises from:

a) Pengakuan awal goodwill; atau a) The initial recognition of goodwill; or

b) Pengakuan awal aset atau liabilitas dari b) The initial recognition of an asset or
transaksi yang bukan kombinasi bisnis dan liability in a transaction which is not a
pada saat transaksi tidak mempengaruhi laba business combination and at the time of
akuntansi atau laba kena pajak (rugi pajak). the transaction, does not affects neither
accounting profit nor taxable profit (tax
loss).

Aset pajak tangguhan diakui untuk seluruh A deferred tax asset shall be recognized for all
perbedaan temporer dapat dikurangkan sepanjang deductible temporary differences to the extent
kemungkinan besar laba kena pajak akan tersedia that it is probable that taxable profit will be
sehingga perbedaan temporer dapat dimanfaatkan available against which the deductible
untuk mengurangi laba dimaksud, kecuali jika aset temporary difference can be utilised, unless the
pajak tangguhan timbul dari pengakuan awal aset deferred tax asset arises from the initial
atau pengakuan awal liabilitas dalam transaksi yang recognition of an asset or liability in a
bukan kombinasi bisnis dan pada saat transaksi transaction that is not a business combination
tidak mempengaruhi laba akuntansi atau laba kena and at the time of the transaction does not
pajak (rugi pajak). affects neither accounting profit nor taxable
profit (tax loss).

Aset dan liabilitas pajak tangguhan diukur dengan Deferred tax assets and liabilities are
menggunakan tarif pajak yang diharapkan berlaku measured at the tax rates that are expected to
ketika aset dipulihkan atau liabilitas diselesaikan, apply to the period when the asset is realized
berdasarkan tarif pajak (dan peraturan pajak) yang or the liability is settled, based on tax rates
telah berlaku atau secara substantif telah berlaku (and tax laws) that have been enacted or
pada akhir periode pelaporan. Pengukuran aset dan substantively enacted by the end of the
liabilitas pajak tangguhan mencerminkan reporting period. The measurement of deferred
konsekuensi pajak yang sesuai dengan cara Grup tax assets and liabilities shall reflect the tax
memperkirakan, pada akhir periode pelaporan, consequences that would follow from the
untuk memulihkan atau menyelesaikan jumlah manner in which the Group expects, at the end
tercatat aset dan liabilitasnya. of the reporting period, to recover or settle the
carrying amount of its assets and liabilities.

Jumlah tercatat aset pajak tangguhan ditelaah The carrying amount of a deferred tax asset
ulang pada akhir periode pelaporan. Grup reviewed at the end of each reporting period.
mengurangi jumlah tercatat aset pajak tangguhan The Group shall reduce the carrying amount of
jika kemungkinan besar laba kena pajak tidak lagi a deferred tax asset to the extent that it is no
tersedia dalam jumlah yang memadai untuk longer probable that sufficient taxable profit will
mengkompensasikan sebagian atau seluruh aset be available to allow the benefit of part or all of
pajak tangguhan tersebut. Setiap pengurangan that deferred tax asset to be utilised. Any such
tersebut dilakukan pembalikan atas aset pajak reduction shall be reversed to the extent that it
tangguhan hingga kemungkinan besar laba kena becomes probable that sufficient taxable profit
pajak yang tersedia jumlahnya memadai. will be available.

Grup melakukan saling hapus aset pajak tangguhan The Group offset deferred tax assets and
dan liabilitas pajak tangguhan jika dan hanya jika: deferred tax liabilities if, and only if:

a) Grup memiliki hak yang dapat dipaksakan a) The Group has a legally enforceable right
secara hukum untuk melakukan saling hapus to offset current tax assets against current
aset pajak kini terhadap liabilitas pajak kini; dan tax liabilities; and

42
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

b) Aset pajak tangguhan dan liabilitas pajak b) The deferred tax assets and liabilities
tangguhan terkait dengan pajak penghasilan related to income taxes levied by the
yang dikenakan oleh otoritas perpajakan yang same taxation authority on either:
sama atas:

i. entitas kena pajak yang sama; atau i. the same taxable entity; or

ii. entitas kena pajak yang berbeda yang ii. different taxable entities which intend to
bermaksud untuk memulihkan aset dan recover current tax assets and liabilities
liabilitas pajak kini dengan dasar neto, atau with a net basis, or to realize the assets
merealisasikan aset dan menyelesaikan and settle the liabilities simultaneously,
liabilitas secara bersamaan, pada setiap in each future period in which
periode masa depan dimana jumlah significant amounts of deferred tax
signifikan atas aset atau liabilitas pajak assets or liabilities are expected to be
tangguhan diperkirakan untuk diselesaikan settled or recovered.
atau dipulihkan.

Grup melakukan saling hapus atas aset pajak kini The Group offset the current tax assets and
dan liabilitas pajak kini jika dan hanya jika: current tax liabilities if, and only if:

a) Memiliki hak yang dapat dipaksakan secara a) Has legally enforceable right to offset the
hukum untuk melakukan saling hapus atas recognized amounts; and
jumlah yang diakui; dan

b) Bermaksud untuk menyelesaikan dengan b) Intends either to settle on a net basis, or to


dasar neto atau merealisasikan aset dan realize the assets and settle liabilities
menyelesaikan liabilitas secara bersamaan. simultaneously.

x. Liabilitas Imbalan Kerja x. Employee Benefits Liabilities

Imbalan Kerja Jangka Pendek Short-Term Employee Benefits

Imbalan kerja jangka pendek diakui ketika pekerja Short-term employee benefits are recognized
telah memberikan jasanya dalam suatu periode when an employee has rendered service
akuntansi, sebesar jumlah tidak terdiskonto dari during accounting period, at the undiscounted
imbalan kerja jangka pendek yang diharapkan akan amount of short-term employee benefits
dibayar sebagai imbalan atas jasa tersebut. expected to be paid in exchange for that
service.

Imbalan kerja jangka pendek mencakup antara lain Short term employee benefits include such as
upah, gaji, bonus dan insentif. wages, salaries, bonus and incentive.

Imbalan Pascakerja Post-Employment Benefits

Imbalan pascakerja seperti pensiun, uang pisah Post-employment benefits such as retirement,
dan uang penghargaan masa kerja dihitung severance and service payments are
berdasarkan Undang-Undang Ketenagakerjaan calculated based on Labor Law No. 13/2003
No. 13/2003 (”UU No. 13/2003”). (“Law No. 13/2003”).

Grup mengakui jumlah liabilitas imbalan pasti neto The Group recognizes the amount of the net
sebesar nilai kini kewajiban imbalan pasti pada defined benefit liability at the present value of
akhir periode pelaporan dikurangi nilai wajar aset the defined benefit obligation at the end of the
program yang dihitung oleh aktuaris independen reporting period less fair value of plan assets
dengan menggunakan metode Projected Unit which calculated by independent actuaries
Credit. Nilai kini kewajiban imbalan pasti ditentukan using the Projected Unit Credit method.
dengan mendiskontokan imbalan tersebut. Present value benefit obligation determine by
discounting the benefit.

Grup mencatat tidak hanya kewajiban hukum The Group not only record for its legal
berdasarkan persyaratan formal program imbalan obligation under the formal terms of a defined
pasti, tetapi juga kewajiban konstruktif yang timbul benefit plan, but also for any constructive
dari praktik informal entitas. obligation that arises from the entity’s informal
practices.

43
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Biaya jasa kini, biaya jasa lalu dan keuntungan atau Current service cost, past service cost and
kerugian atas penyelesaian, serta bunga neto atas gain or loss on settlement, and net interets on
liabilitas (aset) imbalan pasti neto diakui dalam laba the net defined benefit liability (asset) are
rugi. recognized in profit or loss.

Pengukuran kembali atas liabilitas (aset) imbalan The remeasurement of the net defined benefit
pasti neto yang terdiri dari keuntungan dan kerugian liabilities (assets) comprises actuarial gains
aktuarial, imbalan hasil atas aset program dan and losses, the return on plan assets and any
setiap perubahan dampak atas aset diakui sebagai change in effect of the asset are recognized in
penghasilan komprehensif lain. other comprehensive income.

Pesangon Termination Benefits

Grup mengakui pesangon sebagai liabilitas dan The Group recognizes liability and expense
beban pada tanggal yang lebih awal di antara: for termination benefits at the earlier of the
following dates:

(a) Ketika Grup tidak dapat lagi menarik tawaran (a) When the Group no longer can withdraw
atas imbalan tersebut; dan the offer of those benefits; and

(b) Ketika Grup mengakui biaya untuk (b) When the Group recognizes costs for a
restrukturisasi yang berada dalam ruang restructuring within the scope of PSAK
lingkup PSAK No. 57 dan melibatkan No. 57 and involves payment of
pembayaran pesangon. termination benefits.

Grup mengukur pesangon pada saat pengakuan The Group measures termination benefits on
awal, dan mengukur dan mengakui perubahan initial recognition, and measures and
selanjutnya, sesuai dengan sifat imbalan kerja. recognizes subsequent changes, in
accordance with the nature of the employee
benefits.

Grup mengikuti program asuransi pensiun yang The Group has pension insurance program
diselenggarakan oleh PT Asuransi Jiwasraya which organized by PT Asuransi Jiwasraya
(Persero). Sesuai dengan UU No. 13/2003, Grup (Persero). In accordance with the Law
berkewajiban menutupi kekurangan pembayaran No. 13/2003, the Group is obliged to cover
pensiun bila program yang ada sekarang belum the shortage of pension payments when
cukup menutupi kewajiban. the pension plans is currently not sufficient to
cover liabilities.

Pada tanggal 31 Maret 2016, Grup memilih As of 31 March , 2016, the Group choose to
mempertahankan kebijakan yang ada untuk maintain the existing policy to recognize
mengakui keuntungan atau aktuarial, yang mana actuarial gains or, which uses the corridor
menggunakan pendekatan koridor. approach.

Imbalan Kerja Jangka Panjang Lainnya Other Long-Term Employee Benefits

Imbalan jangka panjang lain seperti cuti berimbalan Other long-term benefits such as long service
jangka panjang dan dihitung dengan metode leave and calculated using the projected unit
projected unit credit dan didiskontokan ke nilai kini. credit method and discounted to present
value.

y. Investasi pada Entitas Asosiasi dan y. Investments in Associates and Joint


Pengendalian Bersama Arrangement

Entitas Asosiasi Associates

Entitas asosiasi adalah entitas dimana Grup Associates are entities in which the Group has
memiliki kekuasaan untuk berpartisipasi dalam the power to participate in the financial and
keputusan kebijakan keuangan dan operasional operating policy decisions of the investee but
investee, tetapi tidak mengendalikan atau has no control or jointly control over those
mengendalikan bersama atas kebijakan tersebut policies (significant influence).
(pengaruh signifikan).

44
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Investasi pada entitas asosiasi dicatat dengan Investment in associates is accounted for
menggunakan metode ekuitas. Dalam metode using the equity method. Under the equity
ekuitas, pengakuan awal investasi diakui sebesar method, the investment in an associate is
biaya perolehan dan jumlah tercatat ditambah atau initially recognized at cost and the carrying
dikurang bagian atas laba rugi investee setelah amount is added or subtracted by
tanggal perolehan. Bagian atas laba rugi investee the investor’s share of the profit or loss of
diakui dalam laba rugi. Penerimaan distribusi dari the investee after the date of acquisition.
investee akan mengurangi nilai tercatat investasi. The investor’s share of the profit or loss of
Penyesuaian terhadap jumlah tercatat tersebut juga the investee is recognized in profit or loss.
mungkin dibutuhkan untuk perubahan dalam Distributions received from an investee will
proporsi bagian investor atas investee yang timbul reduce the carrying amount of the investment.
dari penghasilan komprehensif lain, termasuk Adjustments to the carrying amount may also
perubahan yang timbul dari revaluasi aset tetap dan be necessary for changes in the investor’s
selisih penjabaran valuta asing. Bagian investor proportionate interest in the investee arising
atas perubahan tersebut diakui dalam penghasilan from changes in the investee’s other
komprehensif lain. comprehensive income, including those arising
from the revaluation of property, plant and
equipment and from foreign exchange
translation differences. The investor’s share of
those changes is recognized in other
comprehensive income.

Grup menghentikan penggunaan metode ekuitas The Group discontinues the use of the equity
sejak tanggal ketika investasinya berhenti menjadi method from the date when its investment
investasi pada entitas asosiasi sebagai berikut: ceases to be an associate as follows:

(a) Jika investasi menjadi entitas anak, dan (a) If the investment becomes a subsidiary,
and

(b) Jika sisa kepentingan dalam entitas asosiasi (b) If the retained interest in the former
merupakan aset keuangan, maka Grup associate is a financial asset, the Group
mengukur sisa kepentingan tersebut pada nilai measures the retained interest at fair
wajar. value.

Ketika Grup menghentikan penggunaan metode When the Group discontinue the use of the
ekuitas, Grup mencatat seluruh jumlah yang equity method, the Group accounts for all
sebelumnya telah diakui dalam penghasilan amounts previously recognized in other
komprehensif lain yang terkait dengan investasi comprehensive income in relation to that
tersebut menggunakan dasar perlakuan yang sama investment on the same basis as would have
dengan yang disyaratkan jika investee telah been required if the investee had directly
melepaskan secara langsung aset dan liabilitas disposed of the related assets or liabilities.
terkait.

Pengaturan Bersama Joint Arrangement

Pengaturan bersama adalah pengaturan atas dua Joint arrangement is an arrangement of which
atau lebih pihak yang memiliki pengendalian two or more parties have joint control, i.e.
bersama, yaitu persetujuan kontraktual untuk the contractually agreed sharing of control of
berbagi pengendalian atas suatu pengaturan, yang an arrangement, which exist only when
hanya ada ketika keputusan mengenai aktivitas decisions about the relevant actvities require
relevan mensyaratkan persetujuan dengan suara the unanimous consent of the parties sharing
bulat dari seluruh pihak yang berbagi pengendalian. control.

Grup mengklasifikasikan pengaturan bersama The Group classifies joint arrangement as:
sebagai:

1) Operasi Bersama 1) Joint Operation

Merupakan pengaturan bersama yang Represents joint arrangement whereby


mengatur bahwa para pihak yang memiliki the parties that have joint control of
pengendalian bersama atas pengaturan the arrangement have rights to the assets,
memiliki hak atas aset dan kewajiban terhadap and obligations for the liabilities, relating to
liabilitas, terkait dengan pengaturan tersebut. the arrangement. Those parties are called
Para pihak tersebut disebut operator bersama. joint operator.

45
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Operator bersama mengakui hal berikut terkait A joint operator recognize in relation to its
dengan kepentingannya dalam operasi interest in a joint operation:
bersama:

(a) Aset, mencakup bagiannya atas setiap aset (a) Its assets, including its share of any
yang dimiliki bersama; assets held jointly;

(b) Liabilitas, mencakup bagiannya atas (b) Its liabilities, including its share of any
liabilitas yang terjadi bersama; liabilities incurred jointly;

(c) Pendapatan dari penjualan bagiannya atas (c) Its revenue from the sale of its share
output yang dihasilkan dari operasi of the output arising from the joint
bersama; operation;

(d) Bagian atas pendapatan dari penjualan (d) Its share of the revenue from the sale
output oleh operasi bersama; dan of the output by the joint operation;
and

(e) Beban, mencakup bagiannya atas setiap (e) Its expenses, including its share of
beban yang terjadi secara bersama-sama. any expenses incurred jointly.

2) Ventura Bersama 2) Joint Venture

Grup mengklasifikasikan pengaturan bersama The Group classifies joint arrangement


sebagai ventura bersama yang mengatur as a joint venture whereby the parties
bahwa para pihak yang memiliki pengendalian that have joint control of the arrangement
bersama atas pengaturan memiliki hak atas have rights to the net assets of the
aset neto pengaturan tersebut. Para pihak arrangement. Those parties are called
tersebut disebut sebagai venturer bersama. joint venturers.

Venturer bersama mengakui kepentingannya A joint venturer recognize its interest in a


dalam ventura bersama sebagai investasi dan joint venture as an investment and
mencatat investasi tersebut dengan account for that investment using the
menggunakan metode ekuitas. Konsolidasi equity method. Proportional consolidation
proporsional tidak diizinkan. of joint arrangements is no longer
permitted.

Bagian Grup atas laba atau rugi entitas asosiasi The Group’s share of post-acquisition
pasca akuisisi diakui dalam laporan laba rugi profits or losses is recognized in the profit
dan bagian atas mutasi penghasilan or loss and its share of post-acquisition
komprehensif lain-lain pasca akuisisi diakui movements in other comprehensive
di dalam penghasilan komprehensif lain dan income is recognized in other
diikuti dengan penyesuaian pada jumlah comprehensive income with a
tercatat investasi. Dividen yang akan diterima corresponding adjustment to the carrying
dari entitas asosiasi diakui sebagai pengurang amount of the investment. Dividends
jumlah tercatat investasi. Jika bagian Grup atas receivable from associates are recognized
kerugian entitas asosiasi sama dengan atau as a reduction in the carrying amount of
melebihi kepentingannya pada entitas asosiasi, the investment. When the Group’s share
termasuk piutang tanpa agunan, Grup of losses in an associate equals or
menghentikan pengakuan bagian kerugiannya, exceeds its interest in the associate,
kecuali Grup memiliki kewajiban atau including any other unsecured
melakukan pembayaran atas nama entitas receivables, the Group does not recognize
asosiasi. further losses, unless it has incurred legal
or constructive obligations or made
payments on behalf of the associates.

Kerugian yang melebihi nilai tercatat investasi Loss exceeding the carrying value of
tidak diakui, kecuali bila Grup mempunyai the investment is not recognized, unless
komitmen untuk memberikan bantuan the Group has committed to provide
keuangan atau menjamin kewajiban entitas financial support or guarantee the
asosiasi. associates’ obligation.

46
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Laba dan rugi yang dihasilkan dari transaksi Profits and losses resulting from upstream
hulu dan hilir antara Grup dengan entitas and downstream transactions between
asosiasi diakui dalam laporan keuangan the Group and its associates are
konsolidasian Grup hanya sebesar bagian recognized in the Group’s consolidated
investor lain dalam entitas asosiasi. financial statements only to the extent of
the unrelated investor’s interests in the
associates.

Dalam akuntansi metode ekuitas, kepentingan Under the equity method of accounting,
dalam ventura bersama diakui pada biaya interests in joint ventures are initially
perolehan dan disesuaikan selanjutnya untuk recognized at cost and adjusted thereafter
mengakui bagian Grup atas laba rugi dan to recognize the Group’s share of profits
penghasilan komperhensif lain pasca or losses and other comprehensive
perolehan. Ketika bagian grup atas rugi dalam income post acquisition. When the group’s
ventura bersama sama dengan atau melebihi share of losses in a joint venture equals or
kepentingannya dalam ventura bersama exceeds its interests in the joint ventures
(dimana termasuk kepentingan jangka panjang, (which includes any long-term interests
dalam substansinya membentuk bagian dari that, in substance, form part of the
investasi bersih Grup dalam ventura bersama), Group’s net investment in the joint
Grup tidak mengakui kerugian selanjutnya, ventures), the Group does not recognize
kecuali telah menjadi kewajiban atau telah further losses, unless it has incurred
melakukan pembayaran atas nama ventura obligations or made payments on behalf of
bersama. the joint ventures.

Keuntungan yang belum terealisasi atas Unrealized gains on transactions between


transaksi antara Grup dan ventura bersama the Group and its joint ventures are
dieliminasi sebesar kepentingan Grup dalam eliminated to the extent of the group’s
ventura bersama. Kerugian yang belum interest in the joint ventures. Unrealized
terealisasi juga dieliminasi kecuali transaksi losses are also eliminated unless the
tersebut memberikan bukti adanya penurunan transaction provides evidence of an
nilai aset yang dialihkan. Kebijakan akuntansi impairment of the asset transferred.
ventura bersama telah diubah jika diperlukan Accounting policies of the joint ventures
untuk memastikan konsistensi dari kebijakan have been changed where necessary to
yang diterapkan oleh Grup. ensure consistency with the policies
adopted by the Group.

z. Investasi Jangka Panjang Lainnya z. Other Long-Term Investment

Merupakan investasi saham dengan kepemilikan Represent a shares investment with an


kurang dari 20% yang pada awalnya diakui sebesar ownership less than 20% are recognized
nilai wajar ditambah dengan biaya transaksi. Bukti initially at fair value plus transaction costs.
terbaik dari nilai wajar adalah harga kuotasi dipasar The best evidence of fair value is the current
aktif. market price quotations.
Selanjutnya investasi saham yang tidak memiliki Furthermore, share investments that do not
kuotasi harga dipasar aktif dan nilai wajarnya tidak have an active market price quotations and
dapat diukur secara handal, diukur dengan biaya their fair values can not be reliably measured,
perolehan. are measured at cost.

Pada setiap tanggal laporan keuangan, Perusahaan At each reporting date, the Company
mengevaluasi apakah terdapat bukti objektif bahwa evaluates whether there is objective evidence
suatu investasi mengalami penurunan nilai. that an investment is impaired.
Jika terdapat bukti objektif bahwa suatu investasi If there is an objective evidence that an
mengalami penurunan nilai, penurunan tersebut investment is impaired, the decline is charged
dibebankan dalam laporan laba rugi komprehensif to the statement of comprehensive income in
di tahun berjalan. the current year.

aa. Laba per Saham aa. Earning per Share

Laba per saham dasar dihitung dengan membagi Basic earnings per share is computed by
laba bersih diatribusikan kepada pemegang saham dividing net income attributable to owner of the
biasa entitas induk dengan jumlah rata-rata common shareholders parent entity by
tertimbang saham yang beredar dalam satu weighted average number of shares
periode. outstanding during the period.

47
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Untuk tujuan penghitungan laba per saham dilusian, To compute diluted earnings per share,
Grup menyesuaikan laba atau rugi yang dapat the Group adjusting the profit or loss
diatribusikan kepada pemegang saham biasa attributable to common shareholders of parent
entitas induk dan jumlah rata-rata tertimbang entity and weighted average number of shares
saham yang beredar, atas dampak dari seluruh outstanding, as the effects of all dilutive
instrumen berpotensi saham biasa yang bersifat potential ordinary shares.
dilutif.
Jika jumlah saham biasa atau instrumen keuangan If the number of ordinary shares or financial
berpotensi saham biasa yang beredar meningkat instruments potential to be ordinary shares
sebagai akibat dari kapitalisasi, penerbitan saham outstanding increases as a result of a
bonus atau pemecahan saham, atau menurun capitalisation, bonus issue or share split, or
sebagai akibat dari penggabungan saham, decreases as a result of a reverse share split,
perhitungan laba per saham dasar dan dilusian the calculation of basic and diluted earnings
untuk seluruh periode yang disajikan harus per share for all periods presented shall be
disesuaikan secara retrospektif. adjusted retrospectively.
Jumlah rata-rata tertimbang saham beredar untuk The number of weighted average shares
perhitungan laba per saham dasar adalah sebesar outstanding for the calculation of basic
13.573.709.450 dan 13.573.654.550 lembar untuk earnings per share amounted to
tahun-tahun yang berakhir pada 30 Juni 2017 dan 13,573,709,450 and 13,573,654,550 shares
31 Desember 2016. for the years ended June 30, 2017 and
December 31, 2016, respectively.
bb. Biaya Emisi Obligasi dan Saham bb. Bond and Shares Issuance Costs
Biaya emisi obligasi merupakan biaya transaksi Bond issuance costs are transaction costs to
yang harus dikurangkan langsung dari hasil emisi be deducted from the proceeds in order to
dalam rangka menentukan hasil emisi bersih determine the net proceeds of bonds. The
obligasi. Selisih antara hasil emisi bersih dengan difference between the net proceeds and the
nilai nominal merupakan diskonto atau premium nominal value is a discount or premium and
dan diamortisasi selama jangka waktu obligasi yang will be amortized over the term of the bonds.
bersangkutan.
Biaya emisi saham disajikan sebagai bagian Share issuance costs are deducted from
tambahan modal disetor dan tidak diamortisasi. additional paid in capital and not amortized.
Biaya emisi saham disajikan sebagai pengurang Share issuance costs are presented as a
dari tambahan modal disetor dan tidak diamortisasi. deduction of additional paid-in capital and not
amortized.
cc. Segmen Informasi cc. Operating Segment
Grup menyajikan segmen operasi berdasarkan Group presented operating segments based
informasi keuangan yang digunakan oleh on the financial information used by the chief
pengambil keputusan operasional dalam menilai operating decision maker in assessing
kinerja segmen dan menentukan alokasi sumber the performance of segments and in
daya yang dimilikinya. Segmen didasarkan pada the allocation of resources. The segments are
aktivitas dari setiap kegiatan operasi entitas legal based on the activities of each
didalam Grup. the operating legal entities within the Group.
Segmen operasi adalah suatu komponen dari An operating segment is a component of the
entitas: entity:

 yang terlibat dalam aktivitas bisnis yang  that engages in business activities from
memperoleh pendapatan dan menimbulkan which it may earn revenues and incur
beban (termasuk pendapatan dan beban yang expenses (including revenues and
terkait dengan transaksi dengan komponen lain expenses relating to the transactions with
dari entitas yang sama); other components of the same entity);

 yang hasil operasinya dikaji ulang secara  whose operating results are regularly
regular oleh pengambil keputusan operasional reviewed by chief operating decision
untuk membuat keputusan tentang sumber maker to make decisions about
daya yang dialokasikan pada segmen tersebut resources to be allocated to the segment
dan menilai kinerjanya; dan and assesses its performance; and

 yang informasi keuangan yang terpisah  for which separate financial information is
miliknya tersedia. available.

48
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

dd. Program Opsi Kepemilikan Saham Manajemen dd. Management and Employee Stock Option
dan Karyawan (MESOP) Program (MESOP)
Perusahaan menyediakan program opsi saham The Company provides stock option program
untuk karyawan yang berhak dan anggota to their eligible employees and members of
manajemen (MESOP). Program ini terdiri dari management (MESOP). This program consists
program opsi saham bahwa setelah diselesaikan of stock option plan that upon exercise is
melalui penerbitan saham (pengaturan pembayaran settled through issuance of shares (equity –
saham yang diselesaikan dengan instrumen settled share based payment arrangement)
ekuitas) dicatat sebagai transaksi ekuitas. which is accounted as equity transaction.
Pembayaran berbasis saham yang diselesaikan Equity-settled share-based payments to
dengan instrumen ekuitas kepada anggota member of management and others providing
manajemen dan layanan sejenis lainnya diukur similar services are measured at the fair value
pada nilai wajar instrumen ekuitas pada tanggal of the equity instruments at the grant date.
pemberian opsi.
Nilai wajar yang ditentukan pada tanggal pemberian The fair value determined at the grant date of
opsi pembayaran saham yang diselesaikan dengan the equity-settled share-based payments is
instrumen ekuitas dicatat sebagai beban dengan expensed on a straight-line basis over
metode garis lurus sepanjang periode vesting, the vesting period, based on the Company’s
berdasarkan estimasi instrumen ekuitas estimate of equity instruments that will
Perusahaan yang akhirnya akan diberikan, dengan eventually vest, with a corresponding increase
peningkatan yang sesuai pada ekuitas. in equity.
Pada setiap akhir periode pelaporan, Perusahaan At the end of each reporting period,
mengubah estimasi dari jumlah instrumen ekuitas the Company revises its estimate of the
yang diharapkan akan diberikan. Dampak dari number of equity instruments expected to vest.
perubahan atas estimasi awal, jika ada, diakui The impact of the revision of the original
dalam laporan laba rugi komprehensif sebagai estimates, if any, is recognised in statements
biaya kumulatif yang mencerminkan perubahan of comprehensive income such that the
estimasi, dengan penyesuaian berdasarkan cumulative expense reflects the revised
cadangan imbalan kerja yang diselesaikan dengan estimate, with a corresponding adjustment to
instrumen ekuitas. the equity-settled employee benefits reserve.
ee. Sumber Ketidakpastian Estimasi dan ee. Source of Estimation Uncertainty and
Pertimbangan Akuntansi Penting Critical Accounting Judgements
Grup membuat estimasi dan asumsi mengenai The Group makes estimates and assumptions
masa depan. Estimasi dan pertimbangan yang concerning the future. Estimations and
digunakan dalam penyusunan laporan keuangan considerations used in the preparation of
interim terus dievaluasi berdasarkan pengalaman interim financial statements continue to be
historis dan faktor lainnya, termasuk ekspektasi dari evaluated based on historical experience and
peristiwa masa depan yang diyakini wajar. other factors, including expectations of
Walaupun estimasi ini dibuat berdasarkan reasonable future events. Although these
pengetahuan terbaik manajemen atas kejadian dan estimates are based on management's best
tindakan saat ini, hasil yang timbul mungkin knowledge of current events and actions,
berbeda dengan jumlah yang diestimasi semula. actual results may differ from those estimates.
Asumsi dan pertimbangan yang memiliki pengaruh Assumptions and considerations have a
signifikan terhadap jumlah tercatat aset dan significant effect on the carrying amount of
liabilitas diungkapkan di bawah ini. assets and liabilities disclosed in below.
Estimasi Umur Manfaat Estimated of Useful Lives
Grup melakukan penelaahan atas masa manfaat The Group reviews on useful lives of fixed
ekonomis aset tetap dan properti investasi assets and investment property based on
berdasarkan faktor-faktor seperti kondisi teknis dan several factors i.e. technical conditions and
perkembangan teknologi di masa depan. Hasil technology development in the future.
operasi di masa depan akan dipengaruhi atas Operating results in the future will be affected
perubahan estimasi yang diakibatkan oleh by the estimated changes of those factors
perubahan faktor tersebut (Catatan 14 dan 16). (Notes 14 and 16).
Estimasi Volume Lalu Lintas Estimated of Traffic Volume
Dalam menentukan amortisasi hak pengusahaan In determining amortization of toll road
jalan tol, manajemen memproyeksikan volume lalu concession rights, the management has to
lintas setelah tahun berjalan selama sisa periode project traffic volume after current year for the
perjanjian konsesi. Volume lalu lintas diproyeksikan remaining years of the concession agreement.
berdasarkan jumlah kendaraan dan disesuaikan Traffic volume is projected based on the
dengan perbandingan terhadap volume lalu lintas number of vehicles and adjusted by
aktual. comparison to actual vehicle volume.

49
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Namun volume lalu lintas aktual dimasa mendatang However, the actual vehicle volume in the
dapat berbeda dengan estimasi tersebut, future could differ from the estimate,
bergantung pada perubahan faktor eksternal yang depending upon changes in external factors
dapat mempengaruhi tarif tol dan volume lalu lintas. that may affect toll rates and vehicle volume.

Manajemen melakukan penilaian secara periodik The Management performed periodic


terhadap total proyeksi volume lalu lintas. Grup assessment on the total projected traffic
akan menunjuk suatu konsultan lalu lintas volume. The Group will appoint an
professional independen untuk melakukan studi lalu independent professional traffic consultant to
lintas profesional independen dan membuat perform independent professional traffic
penyesuaian yang tepat apabila terdapat studies and make an appropriate adjustment if
perbedaan yang material antara proyeksi volume there is a material difference between
lalu lintas dan volume lalu lintas aktual. projected and actual traffic volume.

Penyisihan Penurunan Nilai Piutang Allowance for Impairment of Receivables

Nilai wajar piutang ditentukan dengan The fair value of accounts receivable is
memperhitungkan penurunan nilai yang bersifat determined by calculating permanent
permanen dan nilai tercatatnya dikurangi untuk impairment and the carrying value is reduced
mengakui penurunan tersebut. Asumsi yang to recognize the decline. The assumptions
digunakan untuk menentukan penyisihan used to determine the allowance for
penurunan nilai piutang didasarkan penilaian impairment of receivables based on an
secara individual atas piutang masing-masing individual assessment of each receivable
debitur (pemberi kerja). debtor (employer).

Imbalan Pascakerja Post Employment Benefits

Nilai kini liabilitas imbalan pascakerja tergantung The present value of post employment benefit
pada beberapa faktor yang ditentukan dengan liabilities depends on several factors which are
dasar aktuarial berdasarkan beberapa asumsi. determined by actuarial basis based on several
Asumsi yang digunakan untuk menentukan biaya assumptions. Assumptions used to determine
(penghasilan) pensiun neto mencakup tingkat pensions cost (benefits) covered discount rate.
diskonto. Perubahan asumsi ini akan The changes of assumptions might affect
mempengaruhi jumlah tercatat imbalan pasca kerja. carrying value of post-employment benefits.

Grup menentukan tingkat diskonto yang sesuai The Group determines the appropriate
pada akhir pelaporan, dengan mempertimbangkan discount rate at the final reporting, by
tingkat suku bunga obligasi pemerintah yang considering the discount rate of government’s
didenominasi dalam mata uang imbalan yang akan bond which denominated in benefit’s currency
dibayar dan memiliki jangka waktu yang serupa that will be paid and have a similar terms with
dengan jangka waktu liabilitas yang terkait. the terms of the related liabilities.

Pajak Penghasilan Final Final Income Tax

Pajak penghasilan dari aktivitas jasa konstruksi Income tax from construction is computed
dihitung berdasarkan Peraturan Pemerintah (PP) based on the Government Regulation No. 40
No. 40 tahun 2009 mengenai perubahan atas PP year 2009 concerning amendments of
No. 51 tahun 2008 tentang pajak penghasilan atas Government Regulation No. 51 year 2008
penghasilan dari usaha jasa konstruksi yang concerning income tax from the construction
berlaku efektif mulai tanggal 1 Agustus 2008, business which effective starting 1 August
dimana perlakuan pengenaan pajak final dikenakan 2008, where the final tax at 3% is applied for
atas kontrak sebesar 3% yang diperoleh mulai contract signed starting August 1, 2008.
tanggal 1 Agustus 2008.

Pajak penghasilan final disajikan diluar beban pajak Final income tax is presented outside income
penghasilan pada laba rugi. tax expenses in profit or loss.

Perbedaan nilai tercatat aset atau liabilitas yang The difference between the final income tax
berhubungan dengan pajak penghasilan final carrying amounts of existing assets and
dengan dasar pengenaan pajaknya tidak diakui liabilities, and their respective final tax bases
sebagai aset atau liabilitas pajak tangguhan. are not recognised as deferred tax assets or
liabilities.

50
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

3. KAS DAN SETARA KAS 3. CASH AND CASH EQUIVALENTS


30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp

Kas/ Cash on Hand 7,300,206,774 3,882,482,103


Bank/ Cash in Banks
Pihak Berelasi/ Related Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Negara Indonesia (Persero) Tbk 1,098,319,117,781 2,258,688,843,046
PT Bank Rakyat Indonesia (Persero) Tbk 620,497,192,935 772,988,264,192
PT Bank Mandiri (Persero) Tbk 299,830,967,485 674,785,340,056
PT Bank Tabungan Negara (Persero) Tbk 107,654,988,611 282,129,080,730
PT Bank Syariah Mandiri 30,169,916,289 4,439,690,131
Indonesia Eximbank 5,147,904,216 2,277,000,586
PT Bank BNI Syariah 4,463,897,642 14,664,168
Dolar Amerika Serikat/ United States Dollar
PT Bank Mandiri (Persero) Tbk 112,251,906,399 90,002,602,128
PT Bank Negara Indonesia (Persero) Tbk 13,867,555,434 18,204,361,160
PT Bank Rakyat Indonesia (Persero) Tbk 828,686,708 835,535,535
Yen Jepang/ Japanese Yen
PT Bank Negara Indonesia (Persero) Tbk 1,427,933,829 1,373,081,942
Dolar Singapura/ Singapore Dollar
PT Bank Negara Indonesia (Persero) Tbk -- 296,444,409
Euro
PT Bank Mandiri (Persero) Tbk 8,382,469 8,012,326
Sub Jumlah/ Sub Total 2,294,468,449,798 4,106,042,920,409
Pihak Ketiga/ Third Parties
Rupiah Indonesia/ Indonesian Rupiah
Industrial and Commercial Bank of China 681,108,530 11,432,728,883
PT Bank UOB Indonesia 106,586,038,904 285,897,862,160
PT Bank Central Asia Tbk 12,397,032,443 9,857,357,564
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk 2,907,119,452 11,928,971,048
Bank of Tokyo Mitsubishi UFJ, Ltd. 2,862,193,130 4,625,866,886
PT Bank Panin Tbk 4,799,298,240 42,205,766,369
PT Bank Bukopin Tbk 10,609,822,108 3,355,612,639
PT Bank Mega Tbk 3,532,213,436 1,609,125,176
PT Bank Maybank Indonesia 6,837,017,273 1,456,051,363
PT Bank Sumitomo Mitsui Indonesia 2,445,004,735 --
PT Bank Pembangunan Daerah Papua 509,009,857 509,009,857
PT Bank Pembangunan Daerah Jawa Timur Tbk 94,017,104 94,134,272
PT Bank J Trust Indonesia Tbk 57,909,009 55,088,828
PT CIMB Niaga Tbk 3,038,388,528 --
PT Bank Pembangunan Daerah Kaltim 4,489,148 53,646,907
PT Bank Danamon Tbk 734,833 1,177,424
PT Bank MNC Internasional Tbk 455,312 1,076,312
BPD Nusa Tenggara Timur -- 12,760,837
PT Bank DBS Tbk 3,029,547,041 --
BPD Banten 64,253,828 --
Bank DKI 200,520,556 --
Riyal Arab Saudi/ Saudi Arabian Riyal
The National Commercial Bank - Jeddah 106,379,530 810,503,705
Ringgit Malaysia/ Malaysian Ringgit
PT Bank Maybank Indonesia Tbk 965,484,207 542,725,487
Sub Jumlah/ Sub Total 161,728,037,204 374,449,465,717
Deposito Berjangka/ Time Deposit
Pihak Berelasi/ Related Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Negara Indonesia (Persero) Tbk 2,551,219,155,006 2,335,923,142,395
PT Bank Rakyat Indonesia (Persero) Tbk 1,750,577,275,100 1,649,050,000,000
PT Bank Mandiri (Persero) Tbk 170,000,000,000 1,096,648,491,307
Sub Jumlah/ Sub Total 4,471,796,430,106 5,081,621,633,702
Pihak Ketiga/ Third Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk 200,000,000,000 500,000,000,000
PT Bank Bukopin Tbk 300,000,000,000 300,000,000,000
PT Bank Mega Tbk 49,570,000,000 65,000,000,000
PT Bank Panin Tbk -- 120,000,000,000
Bank of Tokyo Mitsubishi UFJ, Ltd. -- 100,000,000,000
Koperasi Simpan Pinjam Syahadah -- 5,000,000,000
PT CIMB Niaga 50,000,000,000 --
PT Bank Maybank Indonesia Tbk 5,000,000,000 --
Sub Jumlah/ Sub Total 604,570,000,000 1,090,000,000,000
Jumlah/ Total 7,539,863,123,881 10,655,996,501,931

51
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Tingkat Suku Bunga Deposito Berjangka per Tahun (%)/


Interest Rate of Time Deposits per Annum (%) 5,00% - 8,75% 2,00 - 10,50%
Jangka Waktu/ Time Period 1 - 3 Bulan/ Months 1 - 3 Bulan/ Months

4. INVESTASI JANGKA PENDEK 4. SHORT-TERM INVESTMENTS

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Deposito yang Dibatasi Penggunaannya Restricted of Time Deposits


PT Bank Mandiri (Persero) Tbk 8,448,200,000 8,448,200,000 PT Bank Mandiri (Persero) Tbk
Investasi Jangka Pendek SRIMP Short-Term Investment of SRIMP
Entitas Anak WTR ke Koperasi Syahadah 2,650,000,000 -- a Subsidiary of WTR to Koperasi Syahadah
Jumlah 11,098,200,000 8,448,200,000 Total

Deposito berjangka yang jatuh tempo tiga bulan sampai Time deposits with maturity three months until one
dengan setahun dan sertifikat deposito berjangka yang year and certificates of time deposits which
dijadikan jaminan atas pinjaman bank yaitu sebagai pledged as collateral for bank loans as restricted of
deposito yang dibatasi penggunaannya (Catatan 20). time deposits (Note 20).

5. PIUTANG USAHA - BERSIH 5. ACCOUNTS RECEIVABLE - NET

a. Lancar a. Current

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi Related Parties
Piutang Usaha Jasa Konstruksi 747,274,798,862 508,850,171,885 Construction Service Receivables
Piutang Dagang 449,703,675,719 3,031,027,122,411 Trade Receivables
Dikurangi: Cadangan Kerugian Penurunan Less: Allowance for Impairment Losses of
Nilai Piutang (104,665,166,530) (104,665,166,530) Receivables
Sub Jumlah 1,092,313,308,051 3,435,212,127,766 Sub Total
Pihak Ketiga Third Parties
Piutang Usaha Jasa Konstruksi 1,721,652,705,968 772,353,305,740 Construction Service Receivables
Piutang Dagang 633,752,656,162 142,278,835,289 Trade Receivables
Piutang Sewa 283,380,058 264,196,029 Rent Receivables
Dikurangi: Cadangan Kerugian Penurunan Less: Allowance for Impairment Losses of
Nilai Piutang (34,265,195,678) (32,648,111,548) Receivables
Sub Jumlah 2,321,423,546,510 882,248,225,510 Sub Total
Jumlah 3,413,736,854,561 4,317,460,353,276 Total

Rincian saldo piutang usaha jasa konstruksi adalah The details of construction service receivables are
sebagai berikut: as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
PT Solo Ngawi Jaya 223,770,440,667 74,309,342,421
PT Ngawi Kertosono Jaya (NKJ) 138,379,402,612 --
PT Waskita Bumi Wira 87,560,431,202
PT Kertas Leces (Persero) 86,707,725,121 86,707,725,121
PT Jasamarga Kualanamu Tol 34,730,994,341 92,801,439,040
PT PAL Indonesia (Persero) 28,783,083,708 70,322,041,339
PT Pejagan Pemalang Toll Road 27,968,189,634
PT Dok dan Perkapalan Kodja Bahari (Persero) 26,260,305,600 26,260,305,600
PT Perusahaan Listrik Negara (Persero) 23,660,009,815 25,622,710,368
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 69,454,216,162 132,826,607,996
Sub Jumlah/ Sub Total 747,274,798,862 508,850,171,885

52
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Ketiga/ Third Parties
Pemerintah Daerah/ District Governments 119,408,278,798 84,801,517,732
PT Trikarya Graha Utama 98,562,886,747 91,271,906,135
PT Bangun Investa Graha 91,435,662,956 84,918,388,643
PT Broadbiz Asia 106,596,781,459 62,684,091,475
PT Ade Pede Realty 67,716,744,434 57,474,583,737
Bin Ladin Contractor Group LLC 50,001,948,118 51,822,243,284
PT Sentul City 25,978,561,809
PT Daya Radar Utama 42,013,933,817 --
Kementerian Transportasi dan Komunikasi Republik
Demokratis Timur Leste/
Kementerian Pekerjaan Umum dan Perumahan/
Ministry of Public Works and Housing 81,674,758,727 50,644,395,019
PT Harmas Jalesveva 24,082,127,536 --
PT Tapin Coal Terminal 17,113,043,480 28,963,043,481
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 997,067,978,086 259,773,136,234
Sub Jumlah/ Sub Total 1,721,652,705,968 772,353,305,740
Jumlah/ Total 2,468,927,504,830 1,281,203,477,625

Rincian saldo piutang dagang sebagai berikut: The details of trade receivables are as follows:
30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
PT Kresna Kusuma Dyandra Marga 2,824,934,206,247
KSO/JV Waskita - Adhi 97,101,073,800 25,131,557,400
KSO/JV Waskita - Gorip Nanda Guna 98,679,479,832 --
KSO/ JV Waskita Acset 69,063,560,300
KSO/JV Waskita - Hutama Karya 52,436,332,116 11,321,021,605
KSO/JV Waskita - Wika 52,623,389,839 17,179,935,000
KSO/JV Waskita - PP - HK 46,123,676,229 48,518,259,600
KSO/JV PT WBP - Jaya Konstruksi -- 32,843,433,724
Perum Perumnas 18,480,794,904 17,580,076,348
KSO/JV Waskita - Basuki 15,195,368,700 10,970,657,248
Lain-lain/ Others (dibawah/ below Rp 10 Milyar/ Billion ) -- 42,547,975,239
Sub Jumlah/ Sub Total 449,703,675,719 3,031,027,122,411

Pihak Ketiga/ Third Parties


PT Kapuk Naga Indah 13,124,262,229 47,484,189,955
Apical KAO Chemical 19,632,525,000 --
PT Modernland Realty Tbk 5,900,977,261 11,605,175,250
PT Ganesha Bangun Riau Sarana 7,731,943,210 --
PT Surya Internusa Timur 7,601,492,000 --
PT Permata Citra Cemerlang 7,636,607,936 --
Cengkareng Business City 6,914,541,308 --
PT Girder Indonesia 6,111,760,754 --
Lain-lain/ Others (dibawah/ below Rp 5 Milyar/ Billion ) 584,558,904,625 92,568,041,334
Dikurangi: Cadangan Kerugian Penurunan
Nilai Piutang/
Less: Allowance for Impairment Losses of
Receivables (25,460,358,161) (9,378,571,250)
Sub Jumlah/ Sub Total 633,752,656,162 142,278,835,289
Jumlah/ Total 1,083,456,331,881 3,173,305,957,700

53
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Mutasi cadangan kerugian penurunan nilai piutang The movements of allowance for impairment losses of
adalah sebagai berikut: receivable are as follows:
30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp

Saldo Awal (137,313,278,078) (84,736,533,752) Beginning Balance


Penambahan (8,335,000,000) (52,576,744,326) Addition
Pemulihan 6717915870 -- Recovery
Saldo Akhir (138,930,362,208) (137,313,278,078) Ending Balance

Manajemen telah membentuk cadangan The management provided allowance for impairment
penurunan nilai piutang berdasarkan penilaian losses on receivable, based on individual assessment
individual atas masing-masing pelanggan. of each customers.

b. Tidak Lancar b. Non-Current

Rincian saldo piutang usaha kepada pihak berelasi The details of non-current accounts receivable to
tidak lancar sebagai berikut: related parties are as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Party
PT Waskita Bumi Wira -- 180,002,340,000
Jumlah/ Total -- 180,002,340,000

Jumlah piutang usaha berdasarkan umur adalah Aging of accounts receivable are as follows:
sebagai berikut:
30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp
Sampai dengan 12 Bulan Up to 12 Months
Belum Jatuh Tempo 2,067,429,256,934 3,706,699,153,805 Not Yet Due
Sudah Jatuh Tempo 631,079,113,392 254,189,826,049 Past Due
> 13 - 24 Bulan - Sudah Jatuh Tempo 446,994,496,202 224,551,467,902 >13 - 24 Months - Past Due
> 25 - 36 Bulan - Sudah Jatuh Tempo 102,307,465,223 140,159,416,060 >25 - 36 Months - Past Due
> 36 Bulan - Sudah Jatuh Tempo 165,926,522,810 171,862,829,460 >36 Months - Past Due
Jumlah 3,413,736,854,561 4,497,462,693,276 Total

Piutang usaha dijaminkan pada bank-bank pemberi Certain accounts receivable are used as collateral on
pinjaman (Catatan 20), dengan rincian sebagai bank lenders (Note 20), as follows:
berikut:

 PT Bank Mandiri (Persero) Tbk, piutang usaha  PT Bank Mandiri (Persero) Tbk, accounts
yang dijaminkan terhadap proyek yaitu tagihan receivable used as collateral consisting of terms of
termin atas Proyek Pembangunan CIBIS Tower 9 bill from CIBIS Tower 9 Building Jakarta Project
Building Jakarta sebesar Rp 51.789.000.000, amounted to Rp 51,789,000,000, Brooklyn Alam
Proyek Pembangunan Apartemen Brooklyn Alam Sutera Apartment project amounted to
Sutera sebesar Rp 167.922.000.000, Proyek Rp 167,922,000,000, Universitas Negeri Sebelas
Universitas Negeri Sebelas Maret Solo sebesar Maret Solo project amounted to Rp 1,433,000,000,
Rp 1.433.000.000, Proyek Pembangunan Sopo Del Sopo Del Office Tower Lifestyle Package T-02
Office Tower Lifestyle Package T-02 sebesar project amounted to Rp 245,086,000,000,
Rp 245.086.000.000, Proyek Indocement Indocement Citeureup project amounted to
Citeureup sebesar Rp 17.607.000.000, Proyek Rp 17,607,000,000, PLTM Lebak Tundun project
Pembangunan PLTM Lebak Tundun sebesar amounted to Rp 42,204,000,000, Sangatta Oil
Rp 42.204.000.000, Proyek Pembangunan Tanki Tank EPC project amounted to
Oli Sangatta EPC sebesar Rp 47.244.000.000, Rp 47,244,000,000, Waduk Gondang project
Proyek Pembangunan Waduk Gondang sebesar amounted to Rp 420,690,000,000, Fly Over Kapt.
Rp 420.690.000.000, Proyek Pembangunan Jalan Tendean – Blok M – Ciledug Adam Malik Package
Layang Kapt. Tendean – Blok M – Ciledug Paket project amounted to Rp 89,090,000,000, Fly Over
Adam Malik sebesar Rp 89.090.000.000, Proyek Pegangsaan project amounted to
Pembangunan Fly Over Pegangsaan sebesar Rp 23,668,000,000, Sabo Dam Merapi Sleman
Rp 23.668.000.000, Proyek Pembangunan Sabo District (8 units) project amounted to
Dam Merapi Kabupaten Sleman (8 unit) sebesar Rp 4,086,000,000, Upgrading of Existing Suai

54
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Rp 4.086.000.000, Proyek pengembangan bandara Airport project amounted to


Suai sebesar Rp 433.632.000.000, Proyek Rp 433,632,000,000, Gunung Seriang – Long
Peningkatan Jalan Gunung Seriang – Long Beluah Beluah Road project (Section 1) amounted to
sebesar Rp 39.031.000.000, Proyek Pembangunan Rp 39,031,000,000, Tanjung Selor – Tanjung
Jalan Tanjung Selor – Tanjung Palas – Sekatak Palas – Sekatak Road project amounted to
(Seksi 1) sebesar Rp 78.543.000.000, Proyek Rp 78,543,000,000, Architecture and Mechanical
Pekerjaan Arsitektur dan Mechanical Electrical Electrical Works of Meritus Hotel Seminyak project
Hotel Meritus Seminyak sebesar amounted to Rp 25,500,000,000, Ngawi –
Rp 25.500.000.000, Proyek Pembangunan Jalan Kertosono Toll Road Package 1 project amounted
Tol Ngawi – Kertosono Paket 1 sebesar to Rp 1,348,260,000,000, Belawan Port project
Rp 1.348.260.000.000, Proyek Pelabuhan Belawan amounted to Rp 621,699,000,000, and Raknamo
sebesar Rp 621.699.000.000, dan Proyek Dam project amounted to
Pembangunan Bendungan Raknamo sebesar Rp 512,416,000,000.
Rp 512.416.000.000.
 PT Bank Rakyat Indonesia (Persero) Tbk, piutang  PT Bank Rakyat Indonesia (Persero) Tbk,
usaha yang dijaminkan terhadap proyek yaitu accounts receivable used as collateral consisting
tagihan termin atas proyek Pembangunan of terms of bill from Aji Tulur Bridge West Kutai
Jembatan Aji Tulur Kutai Barat sebesar amounted to Rp 96,048,257,608, Office Building of
Rp 96.048.257.608, Gedung Kantor Satker District Government of Pekanbaru project
Perangkat Daerah Pemkot Pekanbaru sebesar amounted to Rp 45,810,093,188, the Development
Rp 45.810.093.188, Pembangunan Fasilitas Kapal of Submarine Facilities amounted to
Selam sebesar Rp 168.949.229.682, Grande Rp168,949,229,682, Grande Valore Condominium
Valore Condominium sebesar project amounted to
Rp 57.630.815.549, Pembangunan Relokasi RSUD Rp 57,630,815,549, the Development of
dr. Muhammad Zein Painan sebesar Relocation dr. Muhammad Zein Painan District
Rp 29.066.933.228, Pembangunan Hotel BW General Hospital amounted to Rp 29,066,933,228,
Luxury Jambi sebesar Rp 21.426.616.529, the Development of BW Luxury Hotels Jambi
Pekerjaan Paket 13 Simpang Rukis – Tanjung amounted to Rp 21,426,616,529, No. 13 Simpang
Kemuning sebesar Rp 73.565.555.974, Jalan Tol Rukis – Tanjung Kemuning Street Package project
Medan Kualanamu Tebing Tinggi (MKTT) Seksi 3 amounted to Rp 73,565,555,974, Section 3 of
sebesar Rp 395.795.210.393, dan proyek Jalan Tol Medan Kualanamu Tebing Tinggi Tollways project
Medan Kualanamu Tebing Tinggi (MKTT) Seksi 6 amounted to Rp 395,795,210,393, and Section 6
sebesar Rp 199.845.164.204, Tol Solo Ngawi of Medan Kualanamu Tebing Tinggi Tollways
Paket 2 sebesar Rp 360.128.929.487. project amounted to Rp 199,845,164,204, Tol Solo
Ngawi Package 2 amounted to
Rp 360,128,929,487.
 PT Bank Pembangunan Daerah Jabar dan Banten  PT Bank Pembangunan Daerah Jabar and Banten
Tbk, piutang yang dijaminkan terhadap Proyek Tbk, accounts receivable used as collateral
yaitu tagihan termin atas proyek SOR Balikpapan consisting of terms of bill from Balikpapan Sport
sebesar Rp 10.206.804.240, Lanjutan Pelabuhan Center project amounted to Rp 10,206,804,240,
Sisi Darat Kabupaten Penajam Paser Utara Advanced land side port District North Penajam
sebesar Rp 140.007.472.187, Jembatan Lamnyong Paser amounted to Rp 140,007,472,187,
sebesar Rp 1.615.330.880, Peningkatan DI Dumpil Lamnyong Bridge project amounted to
sebesar Rp 31.905.710.433, Rekonstruksi Jalan Rp 1,615,330,880, DI Dumpil escalation project
Batu Mundom – Tabuyung – Natal sebesar amounted to Rp 31,905,710,433, Batu Mundom –
Rp 180.706.079.439, dan Rusun Kemayoran C2-2 Tabuyung – Natal Road Reconstruction project
sebesar Rp 246.153.762.700, Pembangunan amounted to Rp 180,706,079,439, and
Bagian Jalan Tol Ruas Bakauheni sebesar Kemayoran Flat C2-2 amounted to
Rp 188.472.390.795, Renovasi Stadion Renang Rp 246,153,762,700, construction Toll Bakauheni
(Aquatic) GBK sebesar Rp 238.343.727.940, sebesar Rp 188,472,390,795, Renovation of
Pembangunan Bangunan Fasilitas Kapal Selam Stadium Swimming Pool (Aquatic) GBK amounted
Paket B2 sebesar Rp 182.435.905.540. to Rp 238,343,727,940, the Development of
Submarine Facilities B2 amounted to
Rp 182,435,905,540.

 Indonesia Eximbank, piutang yang dijaminkan  Indonesia Eximbank, accounts receivable used as
terhadap proyek yaitu tagihan termin atas proyek collateral consisting of terms of bill from
Jasa Konstruksi Sisi Darat Tahap 1A Bandar Udara Construction Services of West Java International
Internasional Jawa Barat sebesar Airport Land side Phase 1A Project amounted to
Rp 324.313.000.000, Proyek Pembangunan Rp 324,313,000,000, The Development of
Terminal Multipurpose di Pelabuhan Kuala Tanjung Multipurpose Terminal at Kuala Tanjung Port
sebesar Rp 426.338.000.000, Pembangunan Tol project amounted to Rp 426,338,000,000, Solo –
Solo – Ngawi Paket 1 sebesar Ngawi Toll Road project Package 1 amounted to
Rp 1.229.010.000.000. Rp 1,229,010,000,000.

55
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

 PT Bank Panin Tbk (Catatan 20), piutang usaha  PT Bank Panin Tbk (Note 20), accounts receivable
yang dijaminkan terhadap proyek yaitu tagihan which is used as collateral are terms of bill from
termin atas proyek Frontage Surabaya sebesar the Frontage Surabaya project amounted to
Rp 1.345.641.000.000 dan Pembangunan Jalan Rp 1,345,641,000,000 and The Development of
Tol Ciawi – Sukabumi Seksi 2 sebesar Ciawi – Sukabumi Toll Road Section 2 amounted
Rp 1.785.509.200.000. to Rp 1,785,509,200,000.
 PT Bank UOB Indonesia, piutang yang dijaminkan  PT Bank UOB Indonesia, accounts receivable
terhadap proyek yaitu tagihan termin atas proyek used as collateral consisting of terms of bill from
Proyek RSUD Ansari Saleh Banjarmasin Tahap V RSUD Ansari Saleh Banjarmasin Stage V project
sebesar Rp 11.601.154.708, Pembangunan Sistem amounted to Rp 11,601,154,708, Build a System
Penyediaan (SPAM) Maloy, Kabupaten Kutai Timur of Provision (SPAM) Maloy, East Kutai District
(MYC) sebesar Rp 143.719.999.160, (MYC) amounted to Rp 143,719,999,160,
Pembangunan Mako Polda Papua Barat sebesar Development of Mako Polda West Papua
Rp 1.079.071.087, Irigasi DI COLO Kabupaten amounted to Rp 1,079,071,087, Irrigation of DI
Wonogiri sebesar Rp 179.733.671.775, dan COLO Wonogiri amounted Rp 179,733,671,775,
Saluran Sunga, Karang Anyar sebesar and River Channel of Karang Anyar amounted
Rp 205.216.475.680. Rp 205,216,475,680.

 PT Bank Negara Indonesia (Persero) Tbk, piutang  PT Bank Negara Indonesia (Persero) Tbk,
yang dijaminkan terhadap proyek yaitu tagihan accounts receivable used as collateral consisting
termin atas proyek Masjid Baiturrahman Banda of terms of bill from Baiturrahman Mosque of
Aceh sebesar Rp 111.200.569.594, Design, Build, Banda Aceh project amounted to
dan Lansekap Bandara Soekarno Hatta sebesar Rp 111,200,569,594, Soekarno Hatta Airport
Rp 19.262,020,894, DI Batang Sinamar sebesar Design, Build, and Landscape project amounted to
Rp 119.810.058.762, Rajawali Royal Apartment Rp 19,262,020,894, DI Batang Sinamar project
sebesar Rp 135.401.800.000, Jalan Bebas amounted to Rp 119,810,058,762, Rajawali Royal
Hambatan Manado – Bitung sebesar Apartment project amounted to
Rp 469.183.154.117, Pengaman Pantai Tahap 2 Rp 135,401,800,000, Manado – Bitung Freeway
Paket 1 (Giant Sea Wall) sebesar project amounted to Rp 469,183,154,117, Giant
Rp 282.902.248.370, Pembangunan Bendungan Sea Wall project Phase 2 Packet 1 amounted to
Tapin sebesar Rp 263.425.080.410, Pelebaran Rp 282,902,248,370, Tapin Dam Project
Jalan Simpang Tanjung – Aruk II (MYC) sebesar amounted to Rp 263,425,080,410, Simpang
Rp 263.544.498.788, dan Rusun Kemayoran D10- Tanjung – Aruk Road Enlargement project (MYC)
2 sebesar Rp 411.648.416.638. amounted to Rp 263,544,498,788, and Rusun
Kemayoran D10-2 amounted to
Rp 411,648,416,638.
 Bank of Tokyo Mitsubishi UFJ, Ltd piutang yang  Bank of Tokyo Mitsubishi UFJ, Ltd, accounts
dijaminkan terhadap proyek yaitu tagihan termin receivable used as collateral consisting of terms of
atas proyek Saluran Interkoneksi DI. Osaka bill from Interconnection channel DI. Osaka project
sebesar Rp 78.254.291.091, proyek Terminal amounted to Rp 78,254,291,091, Domestic
Domestik Sekupang sebesar Sekupang Terminal project amounted
Rp 28.136.284.488, Proyek Mustika Golf Rp 28,136,284,488, Mustika Golf Apartemen
Apartemen sebesar Rp 59.070.312.279, Proyek project amounted Rp 59,070,312,279, Royal
Rumah Sakit Royal Dental sebesar Dental Hospital project amounted to
Rp 46.218.490.918, Reiz Condo Medan sebesar Rp 46,218,490,918, Reiz Condo Medan project
Rp 383.060.700.000, Proyek Bangunan Rumah amounted to Rp 383,060,700,000, Harapan Kita
Sakit Harapan Kita sebesar Rp 32.151.790.909, Hospital Building Project amounted to
dan Gedung Pusat Jantung Terpadu Tahap III Rp 32,151,790,909, and Heart Integrated Center
sebesar Rp 41.530.045.704, Proyek Pembangunan Building Phase III project amounted to
Bendung DI Kamijoro Kab. Bantul (MYC) sebesar Rp 41,530,045,704, Pembangunan Bendung DI
Rp 101.476.780.058, Proyek Jalur Ganda KA Kamijoro Kab. Bantul (MYC) Project amounted to
Lintas Selatan Jawa Jombang-Madiun sebesar Rp 101,476,780,058, Jalur Ganda KA Lintas
Rp 92.033.300.000, Proyek Pembangunan Turap Selatan Jawa Jombang-Madiun Project amounted
Pasar Lama Tahap III sebesar Rp 34.325.654.938, to Rp 92,033,300,000, Pembangunan Turap Pasar
Proyek Pembangunan Infrastruktur Motaain Lama Phase III Project amounted to
sebesar Rp 193.331.731.327, dan Proyek Rp 34,325,654,938, Pembangunan Infrastruktur
Pelebaran jalan Batu Aji-Kuaro sebesar Motaain Project amounted to
Rp 187.777.759.734. Rp 193,331,731,327, and Batu Aji-Kuaro Road
Enlargement Project amounted to
Rp 187,777,759,734.

 PT Bank Negara Indonesia Syariah, piutang yang  PT Bank Negara Indonesia Syariah, accounts
dijaminkan terhadap proyek yaitu tagihan termin receivable used as collateral consisting of terms of
atas proyek Construction of Karian Multipurpose bill from Construction of Karian Multipurpose Dam
Dam Project sebesar Rp 79.542.335.664, Project amounted Rp 79,542,335,664, Rantepao –

56
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pelebaran Jalan Rantepao – Palopo (MYC) Palopo (MYC) Road Enlargement project
sebesar Rp 116.811.810.134, Jalan Tol Balikpapan amounted Rp 116,811,810,134, Balikpapan –
– Samarinda (Segmen 5) sebesar Samarinda Toll Road (segment 5) amounted
Rp 198.400.638.591, dan Pembangunan Bendung Rp 198,400,638,591, and Bendung D.I Baliase
D.I Baliase sebesar Rp 79.542.335.664. project amounted Rp 79,542,335,664.

 PT Bank Maybank Indonesia, piutang yang  PT Maybank Indonesia, accounts receivable used
dijaminkan terhadap proyek yaitu tagihan termin as collateral consisting of terms of bill from
atas proyek Tol Cimanggis – Cibitung Seksi I Cimanggis – Cibitung Toll Road Section I
sebesar Rp 657.209.000.000 dan Pembangunan amounted Rp 657,209,000,000 and Dam Way
Bendungan Way Sekampung (Paket 2) sebesar Sekampung (Section 2) amounted
Rp 160.202.238.304. Rp 160,202,238,304.

 PT Bank Sumitomo Mitsui Indonesia, piutang yang  PT Bank Sumitomo Mitsui Indonesia, accounts
dijaminkan terhadap proyek yaitu tagihan termin receivable used as collateral consisting of terms of
atas proyek Jalan Hampengan-Mendawai II (Multi bill from Hampengan – Mendawai II Road (Multi
Years) sebesar Rp 120.636.140.170, Apartemen Years) amounted Rp 120,636,140,170, Yukata
Yukata Alam Sutera Rp 297.000.000.000, Irigasi DI Alam Sutera Apartment amounted
Batang Alai sebesar Rp 125.653.893.190, dan Rp 297,000,000,000, Irrigation of DI Batang Alai
Jalan Bebas Hambatan Manado – Bitung (MYC) amounted Rp125,653,893,190 and Manado –
sebesar Rp 496.691.133.760. Bitung Freeway (MYC) amounted
Rp 496,691,133,760.

Manajemen berpendapat bahwa cadangan Management believes that allowance for


penurunan nilai piutang usaha kepada pihak ketiga impairment losses of accounts receivable to third
adalah cukup untuk menutupi yang mungkin timbul parties are sufficient to cover the possible losses on
dari tidak tertagihnya piutang tersebut. Manajemen uncollectible receivables. Management also
juga berpendapat bahwa tidak terdapat risiko yang believes that there is no significant risk
terkonsentrasi secara signifikan atas piutang concentrated in accounts receivable.
usaha.

57
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

6. PIUTANG VENTURA BERSAMA 6. JOINT VENTURES RECEIVABLES

Kemitraan/ Nama Proyek/ 30 Juni 2017/ 31 Desember 2016/


Venturer Project Name June 30, 2017 December 31, 2016
Rp Rp

KSO/JV Waskita - PP - Wika Jembatan Merah Putih -- 135,217,668,092


KSO/JV Waskita - Yasa Jl Galing Aruk 241,646,396,231 --
KSO/JV Waskita - PP - Wika JMP 220,506,568,869
KSO/JV Waskita - Andesmont Simpang Kraft 142,107,967,194 --
KSO/JV Waskita - Bawakaraeng Irigasi D.I Batang Alay 53,527,486,036
KSO/JV Waskita - Daya Mulia Turangga Ipuh Bantal Roads 134,901,142,424 40,654,214,163
KSO/JV Waskita - Nindya Pelebaran Jl. Batu Aji - Kuaro 152,198,162,655 --
KSO/JV Waskita - PAL PLTU Malinau 112,307,664,987 97,759,306,245
KSO/JV Waskita - Basuki Rahmana Putra Dredging & Embankment of Grogo 115,358,640,046 37,281,836,018
KSO/JV Waskita - Yasa Kualanamo 87,706,259,836 --
KSO/JV Waskita - Penta Lansekap Soetta 105,137,732,587 67,839,190,266
KSO/JV Waskita - Yodya Karya Bandara Husein 98,660,002,214 84,982,690,770
KSO/JV Waskita - Sinar Intan PDAM Tanah Grogot 86,671,131,341 --
KSO/JV Waskita - Brantas - Wika Bandung Gerak Sembayat 88,148,687,574
KSO/JV Waskita - Brantas Bendung Jabung 85,234,227,651 --
KSO/JV Waskita - Wika - Shanghai Jl Tol Cisumdawu 82,261,338,827 --
KSO/JV Waskita - JPC SMM Muara Teweh Div.2 80,542,506,524 75,312,751,054
KSO/JV Waskita - Perdasa - Buluh - Larasati Jl Talisayan - Batu Lepok 64,966,841,409 --
KSO/JV Waskita - Brantas - Wika Bendung Gerak Sembayat -- --
KSO/JV Waskita - Cahaya Spam Samarinda Utara 53,853,724,001 --
KSO/JV Waskita - Wika Jalan Tol Seksi 1 Ciawi - Cigombong/Lido 50,208,888,680
KSO/JV Waskita - Brantas Rehabilitasi Sabo & Merapi 52,137,728,350 --
KSO/JV Waskita - Jasamarga Jalan Layang Cikampek Jalan Layang Cikampek 49,438,893,880
KSO/JV Waskita - Brantas Bendungan Panghelak Pandanduri 44,058,346,501 --
KSO/JV Waskita - Taruna Putra Pertiwi Jaringan Irigasi DI Colo (MYC) 43,661,754,102
KSO/JV Waskita - BAP Sabo Dam Merapi 7 BH 39,619,468,733 --
KSO/JV Waskita - PP Irigasi Batang Sinamar 37,581,215,543 --
KSO/JV Waskita - Abdi Mulia Berkah Sal Primer Jabung II 37,127,459,002 --
KSO/JV Waskita - Wika Jalan Tol Bocimi -- --
KSO/JV Waskita - Indah Karya Ciasem Pamanukan 28,002,099,671
KSO/JV Waskita - Larasati Pengendalian Banjir Karang Asam 22,471,818,152 --
KSO/JV Waskita - ZUG PLTU Rote 22,271,582,708 22,271,582,708
KSO/JV Waskita - HK Saluran Induk Sidorejo 21,251,163,217 --
KSO/JV Waskita - PP - Wika Bandara Kualanamu -- 97,383,218,000
KSO/JV Waskita - Yasa Jl Galing Aruk -- 49,256,415,308
KSO/JV Waskita - Brantas Pandan Duri Thp II -- 23,962,740,952
KSO/JV Waskita - GXED PLTA Genyem 22,756,440,722
Lain-lain/ Others
(di bawah/ below Rp 20 Milyar/ Billion ) 171,638,631,482 14,059,375,203
Jumlah/Total 2,647,961,971,149 745,980,988,779

Piutang ventura bersama merupakan pinjaman dan Joint venture receivables represent loan and
biaya ventura bersama yang dibayarkan terlebih advance payment of joint venture’s expenses paid
dahulu oleh Grup. by the Group.

Piutang ventura bersama tidak dikenakan bunga. Joint venture receivables were not subject to
Piutang ini tidak memiliki jaminan dan akan dilunasi interest. These accounts have no collateral and are
pada saat diminta. repayable on demand.

Manajemen berpendapat bahwa piutang ventura Management believes that balances of joint
bersama dapat ditagihkan. venture receivables are collectible.

58
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

7. PIUTANG RETENSI - BERSIH 7. RETENTION RECEIVABLES – NET


30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp

Pihak Berelasi 594,929,840,308 377,875,204,603 Related Parties


Dikurangi: Cadangan Kerugian Penurunan Less: Allowance for Impairment Losses of
Nilai Piutang (1,669,105,387) (1,669,105,387) Receivables
Sub Jumlah 593,260,734,921 376,206,099,216 Sub Total
Pihak Ketiga 653,670,620,784 630,316,039,598 Third Parties
Dikurangi: Cadangan Kerugian Penurunan Less: Allowance for Impairment Losses of
Nilai Piutang (46,922,507,061) (39,824,810,434) Receivables
Sub Jumlah 606,748,113,723 590,491,229,164 Sub Total
Jumlah 1,200,008,848,644 966,697,328,380 Total

Rincian saldo piutang retensi adalah sebagai berikut: The details of retention receivables are as follows:
30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
PT Jasamarga Kualanamu Tol 117,501,543,196 78,070,634,180
PT Solo Ngawi Jaya 105,277,204,558 45,636,017,274
PT Pejagan Pemalang Tol Road 97,232,846,127
PT Ngawi Kertosono Jaya 36,623,672,369
KSO/JV Waskita Karya - Triniti 25,868,436,582 25,723,209,355
PT PAL Indonesia (Persero) 27,238,656,927 --
PT Prima Multi Terminal 24,343,360,045 --
PT Perusahaan Listrik Negara (Persero) 20,144,614,215 32,008,317,558
PT Trans Marga Jateng 12,467,863,408 30,863,448,792
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 128,231,642,881 165,573,577,444
Sub Jumlah/ Sub Total 594,929,840,308 377,875,204,603
Pihak Ketiga/ Third Parties
Pemerintah Daerah/ District Governments 77,383,556,218 101,631,500,965
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
Ministry of Public Works and Housing 117,803,133,211 93,391,549,344
Kementerian Transportasi dan Komunikasi Republik
Demokrasi Timor Leste/ Ministry of Transport and Communication
of the Democratic Republic of Timor Leste 65,391,702,936 49,513,566,703
Kementerian Pekerjaan Umum Republik
Demokrasi Timor Leste/ Ministry of Public Works
of the Democratic Republic of Timor Leste 28,007,124,208
Bin Laden Contractor Group LLC 34,217,997,698 29,705,615,846
PT Pardika Wisthi Sarana 23,431,420,350 23,431,420,350
PT Toba Pengembang Sejahtera 23,129,541,584 --
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion) 284,306,144,579 332,642,386,390
Sub Jumlah/ Sub Total 653,670,620,784 630,316,039,598
Jumlah/ Total 1,248,600,461,092 1,008,191,244,201

Mutasi cadangan kerugian penurunan nilai piutang The movements of allowance for impairment losses
retensi adalah sebagai berikut: of retention receivables are as follows:
30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp

Saldo Awal (41,493,915,821) (27,234,169,399) Beginning Balance


Penambahan (7,097,696,627) (14,259,746,422) Addition
Pemulihan -- -- Recovery
Saldo Akhir (48,591,612,448) (41,493,915,821) Ending Balance

59
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Manajemen telah membentuk cadangan kerugian Management has provided an allowance for
penurunan nilai piutang, berdasarkan penilaian secara impairment losses of receivables, based on
individual atas masing-masing pemberi kerja. individual assessment of each owner of the project.
Manajemen berpendapat bahwa cadangan kerugian Management believes that allowance for
penurunan nilai piutang adalah cukup untuk menutupi impairment losses of receivables is sufficient to
kemungkinan tidak tertagihnya piutang retensi di cover the possible losses on the uncollectible
kemudian hari. Manajemen juga berpendapat bahwa retention receivables in the future. Management
tidak terdapat risiko yang terkonsentrasi secara also believes that there is no significant risk
signifikan atas piutang retensi. concentrated in retention receivables.

8. PIUTANG LAIN-LAIN – BERSIH 8. OTHER RECEIVABLES - NET


a. Piutang Lain-lain Lancar - Bersih a. Other Current Receivable - Net
30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
PT Jasamarga Semarang Batang 1,633,952,413,700 1,210,688,081,800
PT Cinere Serpong Jaya 894,295,914,571 383,099,605,774
PT Ngawi Kertosono Jaya 99,352,419,313 78,080,177,199
PT Solo Ngawi Jaya 61,304,007,378 50,353,840,771
PT Citra Washpphutowa 59,833,512,103 90,845,672,208
PT Jasamarga Kualanamu Tol 53,538,632,937 32,906,183,028
PT Kresna Kusuma Dyandra Marga -- 338,327,190,775
PT Waskita Bumi Wira -- 512,959,866,216
KSO/JV Waskita Triniti -- 80,650,742,181
Lain-lain/ Others (dibawah/ below Rp 2 Milyar/ Billion ) 12,352,475
Sub Jumlah/ Sub Total 2,802,276,900,002 2,777,923,712,427
Pihak Ketiga/ Third Parties
Kementerian Pekerjaan Umum dan
Perumahan Rakyat/ Ministry of Public Works and Housing 5,115,461,052,247 1,064,842,057,235
PT Bakrie Toll Indonesia 69,697,329,695 --
PT Bakrie Toll Road
Badan Pengatur Jalan Tol/
Toll Road Management Agency -- 1,518,447,438,265
PT MNC Tol Investama -- 495,209,837
Lain-lain/ Others 224,473,429,357 256,165,772,995
Dikurangi: Cadangan Kerugian Penurunan Nilai Piutang/
Less: Allowance for Impairment Losses of Receivables (12,521,985,340) --
Sub Jumlah/ Sub Total 5,397,109,825,959 2,839,950,478,332
Jumlah/ Total 8,199,386,725,961 5,617,874,190,759

Piutang lain-lain terutama merupakan biaya yang Other receivables mainly consist of
dibayar terlebih dahulu oleh Grup untuk keperluan bank guarantee fee which has been paid in
penerbitan bank garansi atas kredit modal kerja advance by the Group for the Working Capital
(KMK) untuk subkontraktor. Loan (WCL) to the subcontractors.
Piutang lain-lain kepada Kementerian Pekerjaan Other receivables to Ministy of Public Work and
Umum dan Perumahan Rakyat dan Badan Pengatur Public Housing and Toll Road Management
Jalan Tol (BPJT) merupakan piutang dana dukungan Agency (BPJT) represent receivable on
Pemerintah atas Pengusahaan Jalan Tol Ruas Jalan Government supported fund of Pasuruan –
Tol Pasuruan – Probolinggo berdasarkan Probolinggo Toll Road Concession by First
Amandemen Pertama Perjanjian Pengusahaan Jalan Amendment of Pasuruan - Probolinggo Toll
Tol Ruas Jalan Tol Pasuruan – Probolinggo sesuai Road Concession Agreement Toll Roads
Akta Notaris No. 30 tanggal 25 April 2016 dibuat di according to Deed No. 30, dated April 25, 2016
hadapan Notaris Rina Utami Djauhari dan piutang based on Notary Rina Utami Djauhari and
atas Dana Dukungan Pemerintah atas Pengusahaan receivable on Government supported fund of
Jalan Tol Ruas Ciawi – Sukabumi berdasarkan Ciawi – Sukabumi Toll Road Concession by Last
Adendum akhir Perjanjian Pemberian Dukungan Addendum Support Agreement (PPDP)
Pemerintah (PPDP) No. 10/KU.08.01/PPDP/ No. 10/KU.08.01/PPDP/DDPPTJT/XI/2014 dated
DDPPTJT/XI/2014 tanggal 17 Nopember 2014 dan November 17, 2014 and Notary Deed No. 23,
Akta Notaris No. 23 tanggal 29 Desember 2014 dated December 29, 2014 based on Notary Rina
dibuat di hadapan Rina Utami Djauhari. WTR, entitas Utami Djauhari. WTR, a subsidiary, financed any
anak, membiayai terlebih dahulu kenaikan harga increase in the price of land in advance prior to
tanah yang menjadi tanggungan Pemerintah dan apply for reimbursement to the Government.
mengajukan permohonan penggantian dana
(reimbursement) kepada Pemerintah.

60
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

b. Piutang Lain-lain Tidak Lancar b. Other Non-Current Receivable

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Pihak Berelasi/ Related Parties


PT Istaka Karya (Persero) 74,914,307,748 74,914,307,748
PT Citra Waspphutowa 27,633,692,294 --
PT Jasa Marga Kualanamu Toll 1,060,341,580 --
PT Kresna Kusuma Dyandra Marga -- 137,960,304,749
PT Waskita Bumi Wira -- 149,344,414
Dikurangi: Penyisihan Kerugian Penurunan
Nilai Piutang/
Less: Allowance for Impairment Losses of
Receivables (74,914,307,748) (74,914,307,748)
Sub Jumlah/ Sub Total 28,694,033,874 138,109,649,163
Pihak Ketiga/ Third Parties
PT Bakrie Toll Indonesia -- 69,697,329,695
Kementerian Pekerjaan Umum dan
Perumahan Rakyat/Ministry of Public Works and Housing 210,590,713,614 84,961,986,999
PT Bakrie Toll Road 1,050,000,000 1,050,000,000
Lain-lain/ Others -- 9,092,268,560
Dikurangi: Penyisihan Kerugian Penurunan
Nilai Piutang/
Less: Allowance for Impairment Losses of Receivables (1,050,000,000) (1,050,000,000)
Sub Jumlah/ Sub Total 210,590,713,614 163,751,585,254
Jumlah/ Total 239,284,747,488 301,861,234,417

Piutang lain-lain PT Istaka Karya (Persero) sebesar Other receivables PT Istaka Karya (Persero)
Rp 64.169.976.914 merupakan piutang Perusahaan amounted to Rp 64,169,976,914 were receivable
yang diberikan berdasarkan keputusan para given in accordance with the Shareholders of the
Pemegang Saham Perusahaan diluar RUPS Company decision outside the Annual General
No. KEP-83/MBU/2011 dan No. KEP- Meeting of shareholders No. KEP-83/MBU/2011
PS04/PPA/0411 tanggal 1 April 2011. Pada tanggal and No. Kep-PS04/PPA/0411 dated April 1,
21 Mei 2011, Perusahaan menerima Surat 2011. On May 21, 2011, The Company received
Pengakuan Utang No. L.05B/P/WK/2011 dan a Letter of Acknowledgment Debt
No. DU-SP/2011.01B dari PT Istaka Karya (Persero) No. L.05B/P/WK/2011 and No. DU-SP/2011.01B
sebesar Rp 64.169.976.914. of PT Istaka Karya (Persero) amounted to
Rp 64,169,976,914.

Pada tanggal 12 April 2011, PT Istaka Karya On April 12, 2011, PT Istaka Karya (Persero)
(Persero) memohon kepada Perusahaan sesuai surat requested to the Company through letter
No. DK/2011-323 untuk menerbitkan garansi bank No. DK/2011-323 to issue bank guarantee for
proyek Bandar Lampung By Pass sebesar Bandar Lampung By Pass project amounted to
Rp 10.661.885.000 dan biaya provisi untuk penerbitan Rp 10,661,885,000 and the cost of provision for
garansi bank sebesar Rp 312.445.834. Pada tanggal issued bank guarantee issuance amounted to
30 Maret 2012, bank garansi No. 2011/JPU/GB Rp 312,445,834. On March 30, 2012 the bank
/068/6148/Monday telah dicairkan oleh pemilik guarantee No. 2011/JPU/GB/068/6148/Monday
proyek, sehingga piutang Perusahaan kepada has been executed by the owner of the project,
PT Istaka Karya (Persero) menjadi sebesar so that the receivables of the Company to
Rp 75.144.307.748. Ketidakmampuan PT Istaka PT Istaka Karya (Persero) amounted to
Karya (Persero) dalam memenuhi pembayaran Rp 75,144,307,748. Inability of PT Istaka Karya
utangnya menyebabkan penyelesaian utang (Persero) in fulfilling its debt payments, caused
dilakukan dengan cara Debt to Equity Swap, yaitu the settlement of debt using Debt to Equity Swap
para kreditur mendapatkan posisi sebagai pemegang for solving its debt, means the creditors get a
ekuitas PT Istaka Karya (Persero) sebagai pengganti position as an equity holder of PT Istaka Karya
pembayaran atas utang PT Istaka Karya (Persero) (Persero) in line of of payment for a debt
kepada para kreditur. PT Istaka Karya (Persero) to the creditors.

61
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pembayaran piutang akan dilakukan secara bertahap The payment of receivables will be settled
ditahun ke 9 sampai maksimal 5 tahun. partially at the 9th year for a maximum of 5
years.
Berdasarkan surat dari Perusahaan According to the Company’s letters
No. 483/WK/Dir/2013 tanggal 7 Mei 2013 tentang No. 483/WK/Dir/2013 dated May 7, 2013 that
Pelaksanaan Putusan Pengesahan Perdamaian concerns to The Execution of Decision to
(Homologasi) No. 23/PKPU/ 2012/PN.Niga.JKT.PST. Ratification of Peace (Homologation)
Perusahaan meminta PT Istaka Karya (Persero) untuk No. 23/PKPU/2012/PN.Niga.JKT.PST. The
menyelesaikan utangnya dengan skema penyelesaian Company asked PT Istaka Karya (Persero) to
sebagai berikut: resolve the debt with this settlement scheme:

1. Pembayaran awal senilai 3% atau sebesar 1. The initial payment valued at 3% or in amount
Rp 2.549.586.465. Rp 2,549,586,465.

2. Pemenuhan sisa pembayaran senilai 97% dari 2. The fulfillment of the remaining payment
jumlah utang dalam bentuk penyertaan saham valued at 97% from the total debt in the form
sementara (Debt to Equity Swap) sebesar of temporary investments in share of stocks
Rp 82.436.629.045. (Debt to Equity Swap) for Rp 82,436,629,045.

Berdasarkan surat di atas diterima jawaban PT Istaka Based on the letters above, the company has
Karya (Persero) dengan surat No. DU/2013-131 received the answer from PT Istaka Karya
tanggal 15 Mei 2013 yang berisi: (Persero) with the letters No. DU/2013-131
dated May 15, 2013 that contains:

1. Pembayaran awal 3% bersumber dari pencairan 1. The initial payment of 3% from the
piutang atas eskalasi proyek SKSD. disbursement of receivables of the escalation
SKSD project.
2. Sisa pembayaran sebesar 97% dalam bentuk 2. The remaining payment of 97% in the form of
penyertaan saham, sedang dilakukan kajian oleh investments in share of stocks, is being
Kementrian Keuangan dan instansi terkait. reviewed by the Ministry of Finance and
related institutions.

Pada 31 Desember 2016, terdapat pemulihan piutang As of December 31, 2016, there is recovery of the
kepada PT Istaka Karya (Persero) sebesar allowance for impairment losses of receivable to
Rp 230.000.000 atas pembayaran sejumlah tersebut PT Istaka Karya (Persero) amounted to
oleh PT Istaka Karya (Persero). Sampai dengan Rp 230,000,000. Until reporting date, PT Istaka
tanggal pelaporan, PT Istaka Karya (Persero) belum Karya (Persero) has not fulfilled the remaining
memenuhi sisa pembayaran senilai 97% dari jumlah payment valued at 97% from the total debt in the
utang dalam bentuk penyertaan saham sementara form of temporary investments in share of stock
(Debt to Equity Swap) sehingga Perusahaan (Debt to Equity Swap) thus the Company provided
membukukan cadangan kerugian penurunan piutang allowance for impairment loss on receivable to
kepada PT Istaka Karya (Persero) sebesar PT Istaka Karya (Persero) amounted to
Rp 74.914.307.748 atau sebesar 100% dari nilai Rp 74,914,307,748 or 100% from receivable.
piutang. Tidak ada perubahan pada 30 Juni 2017. There is no changes as of June 30, 2017.

Mutasi penyisihan kerugian penurunan nilai piutang The movements of allowance for impairment
lain-lain adalah sebagai berikut: losses of other receivables are as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Saldo Awal (75,964,307,748) (76,194,307,748) Beginning Balance


Penambahan (12,521,985,340) -- Addition
Pemulihan -- 230,000,000 Recovery
Saldo Akhir (88,486,293,088) (75,964,307,748) Ending Balance

Manajemen berkeyakinan bahwa jumlah cadangan Management believes that allowance for
kerugian penurunan nilai piutang cukup untuk impairment losses on accounts receivable is
menutupi kemungkinan tidak tertagihnya piutang lain- sufficient to cover the possible losses on the
lain di kemudian hari. uncollectible other receivables in the future.

62
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

9. PERSEDIAAN 9. INVENTORIES

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Bahan Baku Raw Material
Bahan Baku Konstruksi 1,187,549,727,723 1,586,613,309,252 Construction Raw Material
Beton Precast 421,227,796,727 228,122,183,589 Precast Concrete
Suku Cadang 3,901,511,697 3,824,977,879 Spareparts
Sub Jumlah 1,612,679,036,147 1,818,560,470,720 Sub Total

Persediaan dalam Pengembangan Work in Progress


Aset Real Estat 938,713,635,449 736,777,267,750 Real Estate Assets
Tanah yang Belum Dikembangkan 795,739,844 795,739,844 Undeveloped Land
Sub Jumlah 939,509,375,293 737,573,007,594 Sub Total

Persediaan untuk Dijual Inventory Ready for Sale


Tanah Kavling Siap Dijual 598,345,228 598,345,228 Lots of Land Ready for Sale
Sub Jumlah 598,345,228 598,345,228 Sub Total
Jumlah 2,552,786,756,668 2,556,731,823,542 Total

Bahan baku konstruksi merupakan persediaan material Construction raw material represent construction
dan perlengkapan proyek yang masih tersedia di materials and equipment supply projects which
gudang proyek yang dimiliki oleh Grup. Persediaan still available at the warehouse of existing project
material terdiri dari persediaan besi, semen, solar, owned by the Group. The raw material consists of
tiang pancang, keramik/ marmer, traveler form, iron, cement, diesel, pile, ceramic/ marble, traveler
geotextile, aspal, dan batu. form, geotextile, asphalt, and stone.

Beton precast merupakan persediaan produk beton The precast concentrate represents inventory of
unit usaha precast yang terdiri dari persediaan barang concrete products of precast business unit
jadi produk beton, persediaan bahan baku, dan bahan consisting of concrete finished good, raw materials
penolong serta persediaan bahan dalam proses. and supporting materials, and materials in the
process.

Persediaan tanah kavling merupakan persediaan tanah Inventory of lots of land represent land owned by
Perusahaan di Perumahan Bukit Diponegoro the Company in Bukit Diponegoro Housing
(Semarang) yang memiliki luas tanah sebesar 2.469m 2 (Semarang), which has a land area of 2,469sqm
dengan status kepemilikan tanah sertifikat Hak Guna with a certificate of land ownership status Right to
Bangunan (HGB), dengan masa berlaku sampai Use (HGB), valid until year 2030. The entire
dengan tahun 2030. Seluruh kepemilikan atas tanah ownership of land on behalf of the Company.
tersebut atas nama Perusahaan.

Manajemen tidak membentuk cadangan penurunan Management did not provide allowance for
nilai persediaan, sebab Manajemen berkeyakinan impairment losses of inventory as management
bahwa persediaan dapat digunakan dan djual. believes that all inventories are fully usable and
able to sale.

10. TAGIHAN BRUTO KEPADA PENGGUNA JASA 10. GROSS AMOUNT DUE FROM CUSTOMERS

a. Tagihan Bruto kepada Pengguna Jasa – Lancar a. Gross Amount Due From Customers -
Current Portion

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi 7,053,144,736,280 5,485,979,232,464 Related Parties
Pihak Ketiga 5,751,999,229,321 5,485,823,365,384 Third Parties

Jumlah 12,805,143,965,601 10,971,802,597,848 Total

63
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Rincian saldo tagihan bruto kepada pengguna jasa – The details of gross amount due from
bagian lancar adalah sebagai berikut: customers – current portion are as follows:
30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi - Jangka Pendek/
Related Parties - Current Portion
PT Perusahaan Listrik Negara (Persero) (PLN) 2,386,725,162,977 1,990,249,354,253
PT Solo Ngawi Jaya (SNJ) 757,140,980,531 1,368,003,049,470
PT Hutama Karya (Persero) (HK) 709,983,151,627 577,061,676,188
PT Ngawi Kertosono Jaya (NKJ) 245,423,930,761 272,822,967,275
PT Angkasa Pura II (Persero) (AP II) 282,004,139,182 280,681,288,988
PT Kereta Api Indonesia (Persero) (KAI) 325,822,993,533 167,574,850,275
PT Jasamarga Kualanamu Toll (JKMT) 143,945,848,817 251,263,685,084
PT Prima Multi Terminal (PMT) 136,419,016,129 138,997,958,616
PT PAL Indonesia (Persero) (PAL) 34,803,835,925 167,395,162,724
PT Pelabuhan Indonesia II (Persero) (Pelindo II) 59,366,780,681 54,070,595,971
Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion ) 1,971,508,896,118 217,858,643,620
Sub Jumlah/ Sub Total 7,053,144,736,280 5,485,979,232,464

Pihak Ketiga - Jangka Pendek/


Third Parties - Current Portion
Kementerian Perhubungan/Ministry of Transportation 3,734,466,507,365 3,388,424,048,519
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
Ministry of Public Works and Housing 770,304,000,863 954,200,345,485
PT Metro Wisata Raya 478,000,324,256 --
Pemerintah Daerah/ District Governments 292,117,435,548 520,594,671,189
PT Puriampera Intipratama 138,043,927,273 141,380,584,759
Telkom Property (PT Graha Sarana Duta) 46,740,016,540 51,807,004,419
Samsung C&T Corporation 39,908,001,699 60,928,901,578
Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion ) 252,419,015,777 368,487,809,435
Sub Jumlah/ Sub Total 5,751,999,229,321 5,485,823,365,384
Jumlah/ Total 12,805,143,965,601 10,971,802,597,848

Informasi penting lainnya yang berkaitan dengan Other important informations regarding to gross
tagihan bruto kepada pengguna jasa sampai dengan amount due from customers as of June 30,
30 Juni 2017 adalah sebagai berikut: 2017 are as follows:
1. PT Perusahaan Listrik Negara (Persero) (PLN) – 1. PT Perusahaan Listrik Negara (Persero)
Proyek Transmisi Sumatera 500 KVA (PLN) Sumatera Transmition 500 KVA
Project

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
Pembangunan Transmisi Sumatera 500 KVA contract on Sumatera Transmition 500 KVA
seksi 1 Proyek No. 0532.PJ/DAN.02.02/DIR/2015 section 1 Project No. 0532.PJ/DAN.02.02/
dan seksi 2 Proyek No. 0533.PJ/DAN.02.02/ DIR/2015 and section 2 Project
DIR/2015 tanggal 23 Oktober 2015 dengan nilai No. 0533.PJ/DAN. 02.02/DIR/2015 dated
kontrak masing-masing sebesar October 23, 2015 with contract value of
Rp 3.532.414.000.000 dan Rp 2.573.501.000.000. Rp 3,532,414,000,000 and
Rp 2,573,501,000,000, respectively.

2. PT Hutama Karya (Persero) – Proyek 2. PT Hutama Karya (Persero) –


Pembangunan Jalan Tol Terbanggi Besar – The Development of Terbanggi Besar –
Kayu Agung Kayu Agung Toll Road Project

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
pembangunan Jalan Tol Terbanggi Besar – Kayu contract for the development of Terbanggi
Agung No. 1016/WK/DIR/2016 pada tanggal Besar – Kayu Agung Toll Road Project
12 Oktober 2016 dengan nilai kontrak sebesar No. 1016/WK/DIR/2016 dated October 12,
Rp 2.443.150.000.000. 2016 with contract value of
Rp 2,443,150,000,000.

64
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

3. PT Solo Ngawi Jaya – Proyek Jalan Tol Solo - 3. PT Solo Ngawi Jaya – Solo - Ngawi Toll
Ngawi Road Project

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
pembangunan Jalan Tol Solo - Ngawi contract on Solo – Ngawi Toll Road Project
No. 682/WK/DIR/2015, pada tanggal 24 Juni 2015 No. 682/WK/DIR/2015 dated June 24, 2015
sebesar Rp 960.376.000.000 untuk Paket SN.1A, with contract value of Rp 960,376,000,000
Rp 1.042.286.000.000 untuk Paket SN.1B, for SN.1A, Rp 1,042,286,000,000 for SN.1B,
Rp 1.050.689.000.000 untuk Paket SN.2A dan Rp 1,050,689,000,000 for SN.2A and
Rp 600.076.000.000 untuk Paket SN.2B. Rp 600,076,000,000 for SN.2B.

4. PT Ngawi Kertosono Jaya – Proyek Jalan Tol 4. PT Ngawi Kertosono Jaya – Solo -
Solo - Kertosono Kertosono Toll Road Project

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
pembangunan Jalan Tol Solo – Kertosono contract on Solo – Kertosono Toll Road
No. 682/WK/DIR/2015, pada tanggal 24 Juni 2015 Project No. 682/WK/DIR/2015 dated
dengan nilai kontrak sebesar June 24, 2015 with contract value of
Rp 1.348.187.000.000. Rp 1,348,187,000,000.

5. PT Angkasa Pura II (Persero) – Proyek 5. PT Angkasa Pura II (Persero) – The


Pembangunan Gardu Induk Bandara Soekarno Development of Soekarno Hatta Airport
Hatta Substation

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
Pembangunan Gardu Induk Bandara Soekarno contract for the development of Soekarno
Hatta No. 1235/WK/DIR/2016 pada tanggal Hatta Airport Substation No. 1235/WK/
30 Nopember 2016 dengan nilai kontrak sebesar DIR/2016 dated November 30, 2016 with
Rp 202.612.727.272. contract value of Rp 202,612,727,272.

6. PT Jasamarga Kualanamu Tol – Proyek Jalan 6. PT Jasamarga Kualanamu Tol – Medan -


Tol Medan - Kualanamu - Tebing tinggi Kualanamu – Tebing Tinggi Toll Road
Project

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
pembangunan Jalan tol Medan – Kualanamu – contract on Medan – Kualanamu – Tebing
Tebing Tinggi No. 006/Kontrak-Dir/2015 pada Tinggi Toll Road Project No. 006/Kontrak-
tanggal 18 Juni 2015 dengan nilai kontrak sebesar Dir/2015 dated June 18, 2015 with contract
Rp 399.777.000.000. value of Rp 399,777,000,000.

7. PT Prima Multi Terminal – Proyek Terminal 7. PT Prima Multi Terminal - Multipurpose


Serbaguna dan Fasilitas Pendukung di Terminal Project and Support Facility in
Pelabuhan Kuala Tanjung Kuala Pelabuhan Tanjung

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
pembangunan Terminal Serbaguna dan Fasilitas contract to Multipurpose Terminal Project
Pendukung di Pelabuhan Kuala Tanjung and Support Facility in Kuala Tanjung Port
No. UM.58/1/19/PMT-15 pada tanggal 17 April No. UM.58/1/19/PMT-15 dated April 17,
2015 dengan nilai kontrak sebesar 2015 with contract value of
Rp 734.506.000.000. Rp 734,506,000,000.

8. PT PAL Indonesia (Persero) – Proyek 8. PT PAL Indonesia (Persero) –


Pembangunan Bangunan Fasilitas Kapal Selam The Development of Submarine Building
Facility

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
Pembangunan Bangunan Fasilitas Kapal Selam contract on the development of Submarine
No. 002/P/WK/DRB/2016 pada tanggal 29 Agustus Building Facility No. 002/P/WK/DRB/2016
2016 dengan nilai kontrak sebesar dated August 29, 2016 with contract value of
Rp 201.364.090.000. Rp 201,364,090,000.

65
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

9. Kementerian Perhubungan – Proyek LRT 9. Ministry of Transportation –


Sumatera Selatan The Development of South Sumatera LRT
Project

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
pembangunan proyek LRT Sumatera Selatan contract on the development of South
No. III/WK/DIR/2015 pada tanggal 13 Nopember Sumatera LRT No. III/WK/DIR/2015 dated
2015 dengan nilai kontrak sebesar November 13, 2015 with contract value of
Rp 8.402.350.103.055. Rp 8,402,350,103,055.

10. Kementerian Perhubungan – Proyek 10. Ministry of Transportation –


Pembangunan Pelabuhan Belawan The Development of Belawan Port
Project

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
pembangunan Pelabuhan Belawan contract on the development of Belawan
No. 02/CD/CW/PPK-BLW/IV/2016 pada tanggal Port Project No. 02/CD/CW/PPK-BLW/
25 April 2016 dengan nilai kontrak sebesar IV/2016 dated April 25, 2016 with contract
Rp 621.699.000.729. value of Rp 621,699,000,729.

11. Kementerian Pekerjaan Umum dan Perumahan 11. Ministry of Public Works and Housing –
Rakyat – Proyek Pembangunan Wisma Atlet The Development of Wisma Atlet
Kemayoran Blok C2-2 dan D10-2 Kemayoran Block C2-2 and D10-2 Project

Perusahaan memperoleh kontrak pekerjaan untuk The Company entered into a construction
pembangunan Wisma Atlet Kemayoran Blok C2-2 contract on the development of Wisma Atlet
dan D10-2 No. 276/WK/DIR/2016 pada tanggal Kemayoran Blok C2-2 and D10-2
17 Maret 2016 dengan nilai kontrak sebesar No. 276/WK/DIR/2016 dated March 17,
Rp 995.506.181.818. 2016 with contract value of
Rp 995,506,181,818.

12. Pemerintah Demokrasi Timor Leste – Proyek 12. The Government of The Democratic of
Pengembangan Existing Bandara Suai Timor Leste - Upgrading Existing Suai
Airport Project

Perusahaan memperoleh kontrak pekerjaan The Company entered into a construction


dengan No. 1045.2/WK/Dir/2013 pada proyek contract No. 1045.2/WK/Dir/2013 on
pengembangan bandara Suai di Timor Leste pada Development of Upgrading of Existing Suai
tanggal 11 Maret 2014 dengan nilai kontrak Airport Project in Timor Leste dated
sebesar USD 67.671.189,95. March 11, 2014 with contract value of
USD 67,671,189.95.

b. Tagihan Bruto kepada Pengguna Jasa - Bagian b. Gross Amount Due From Customers – Non-
Tidak Lancar Current Portion

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi 1,877,669,951,873 1,446,161,376,885 Related Parties
Dikurangi: Cadangan Kerugian Less: Allowance for Impairment
Penurunan Nilai Piutang (21,663,660,868) (21,663,660,868) Losses of Receivables
Sub Jumlah 1,856,006,291,005 1,424,497,716,017 Sub Total

Pihak Ketiga 771,308,752,366 847,128,799,220 Third Parties


Dikurangi: Cadangan Kerugian Less: Allowance for Impairment
Penurunan Nilai Piutang (137,559,028,142) (133,709,072,536) Losses of Receivables
Sub Jumlah 633,749,724,224 713,419,726,684 Sub Total
Jumlah 2,489,756,015,229 2,137,917,442,701 Total

66
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Rincian saldo tagihan bruto kepada pengguna jasa – The details of gross amount due from
bagian tidak lancar adalah sebagai berikut: customers – non-current portion are as
follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
PT Jasamarga Semarang Batang (JSB) 1,781,766,950,914 596,234,715,491
PT Kresna Kusuma Dyandra Marga (KKDM) -- 793,389,143,691
Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion ) 95,903,000,959 56,537,517,703
Sub Jumlah/ Sub Total 1,877,669,951,873 1,446,161,376,885

Pihak Ketiga/ Third Parties


Kementerian Transportasi dan Komunikasi
Republik Demokrasi Timor Leste/
The Ministry of Transport and Communication
of the Republic Democratic of Timor Leste 220,393,283,854 292,958,623,407
Kementerian Pekerjaan Umum Republik Demokrasi Timor Leste/
The Ministry of Public Work of the Republic Democratic
of Timor Leste 163,061,818,038 226,467,399,658
Kementerian Perhubungan/ Ministry of Transportation 215,675,597,281 60,498,909,867
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
Ministry of Public Works and Housing 77,063,437,951 78,882,561,982
Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion ) 95,114,615,242 188,321,304,306
Sub Jumlah/ Sub Total 771,308,752,366 847,128,799,220
Jumlah/ Total 2,648,978,704,239 2,293,290,176,105
Cadangan kerugian penurunan nilai piutang (155,372,733,404) (155,372,733,404)
Jumlah/ Total 2,493,605,970,835 2,137,917,442,701

Mutasi cadangan kerugian penurunan nilai tagihan The movements of allowance for impairment losses
bruto – bagian tidak lancar adalah sebagai berikut: of gross amount due from customers – non-current
postion are as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Saldo Awal/ Beginning Balance (155,372,733,404) (89,137,756,692)
Penambahan/ Addition (3,849,955,606) (66,234,976,712)
Saldo Akhir/ Ending Balance (159,222,689,010) (155,372,733,404)

Manajemen berpendapat bahwa tagihan bruto dapat Management believes all gross amount due from
ditagihkan. Manajemen juga berpendapat bahwa customers are collectible. Management also
cadangan kerugian penurunan nilai tagihan bruto believes that allowance for impairment losses of
adalah cukup untuk menutupi kemungkinan tidak gross amount due from customers is sufficient to
tertagihnya tagihan bruto di kemudian hari. cover the possible losses on the uncollectible gross
amount due from customers in the future.

67
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

11. PERPAJAKAN 11. TAXES

a. Pajak Dibayar Dimuka a. Prepaid Taxes

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Pasal 22 Article 22
2017 10,900,092,398 -- 2017
2016 16,150,829 16,150,829 2016
2014 170,154,919 170,154,919 2014
Pasal 23 Article 23
2017 -- 2017
2016 7,097,335,534 2,829,513,314 2016
2015 4,000,000 4,000,000 2015
2014 2,733,644,449 2,733,644,449 2014
Pajak Pertambahan Nilai Value Added Tax
2017 733,566,521,891 -- 2017
2016 478,969,781,661 478,969,781,661 2016
2015 dan 2014 -- 674,719,541,628 2015 and 2014
Jumlah 1,233,457,681,681 1,159,442,786,800 Total

Pada tanggal 13 Maret 2017, Perusahaan menerima On March 13, 2017, the Company has received
beberapa Surat Ketetapan Pajak Lebih Bayar Overpayment Tax Assessment Letter from Tax
(SKPLB) dari Kantor Pelayanan Pajak (KPP) atas Service Office (TSO) of Value Added Taxes
Pajak Pertambahan Nilai (PPN) untuk tahun fiskal (VAT) for fiscal year 2014 to confirm
2014 mengkonfirmasi kelebihan pajak sejumlah overpayment of total Rp 182,866,974,382 and
Rp 182.866.972.382 dan menerima Surat Tagihan has received Tax Collection Letter amounting to
Pajak sebesar Rp 722.653.679 terkait denda pajak Rp 722,653,679 related to administrative
atas PPN tahun 2014. sanction of VAT year 2014.

b. Utang Pajak b. Taxes Payables

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Pasal 21 41,990,570,947 15,941,344,748 Article 21


Pasal 22 12,282,419,711 12,394,937,222 Article 22
Pasal 23 46,907,094,730 7,127,479,204 Article 23
Pasal 4 (2) - Final 34,511,533,376 39,979,278,242 Article 4 (2) - Final
Pajak Pertambahan Nilai 111,913,686,175 153,698,517,834 Value Added Tax
Pajak Final Konstruksi 1,178,497,601 65,762,843 Construction Final Tax
Pasal 29 39,155,172,557 180,607,461,491 Article 29
Jumlah 287,938,975,098 409,814,781,584 Total

c. Pajak Kini c. Current Tax

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp

Pajak atas Pendapatan Non Final Non Final Income Tax


Perusahaan -- -- The Company
Entitas Anak 94,837,709,686 216,404,071,773 Subsidiaries
Beban Pajak Tangguhan 68,088,966,021 -- Deferred Tax Expenses
Jumlah 162,926,675,707 216,404,071,773 Total

68
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

d. Pajak Tangguhan d. Deferred Tax


(Dibebankan) Dikreditkan (Dibebankan)
Dikreditkan ke ke Penghasilan
Laba Rugi/(Charged) Komprehensif Lain/
31 Desember 2016/ Penyesuaian/ Credited to Profit Credited to 30 Juni 2017/
December 31, 2016 Adjustment or Loss Other Comprehensive Income June 30, 2017
Rp Rp Rp Rp Rp

Aset Pajak Tangguhan/


Deferred Tax Assets
PT SMR 191,016,676,805 -- (67,167,840,157) (7) 123,848,836,641
PT KKDM 327,852,471 327,852,471
PT TJT 916,051,510 -- -- -- 916,051,510
PT CCT 128,544,466 -- -- -- 128,544,466
PT SRIMP 234,246,498 -- -- -- 234,246,498
PT WBP 2,842,627,745 -- (921,125,859) 53,000,134 1,974,502,020
Jumlah Aset Pajak Tangguhan/
Total Deferred Tax Assets 195,138,147,024 327,852,471 (68,088,966,016) 53,000,127 127,430,033,607

Liabilitas Pajak Tangguhan/


Deferred Tax Liabilities
PT PPTR 7,830,452,417 (425,233,093) -- -- 7,405,219,324
PT WKR 780,510,744 235,448,453 -- 542,299,147 1,558,258,344
Jumlah Liabilitas Pajak Tangguhan/
Total Deferred Tax Liabilities 8,610,963,161 (189,784,640) -- 542,299,147 8,963,477,668
10,521,736,012

(Dibebankan) Dikreditkan
Laba Rugi/ Penghasilan
(Charged) Komprehensif Lain/
Credited Credited to
31 Desember 2015 Penyesuaian/ to Profit Other Comprehensive 31 Desember 2016/
December 31, 2015 Adjustment or Loss Income December 31, 2016
Rp Rp Rp Rp Rp
Aset Pajak Tangguhan/
Deferred Tax Assets
PT SMR 181.627.223.711 -- 9.401.602.410 (12.149.316) 191.016.676.805
PT TJT 367.818.642 -- 1.041.532.422 (493.299.554) 916.051.510
PT CCT 51.084.741 -- 84.058.152 (6.598.427) 128.544.466
PT SRIMP -- 1.232.557.000 181.435.552 (1.179.746.054) 234.246.498
PT WBP -- -- 2.993.131.714 (150.503.969) 2.842.627.745
Jumlah Aset Pajak Tangguhan/
Total Deferred Tax Assets 182.046.127.094 1.232.557.000 13.701.760.250 (1.842.297.320) 195.138.147.024

Liabilitas Pajak Tangguhan/


Deferred Tax Liabilities
PT PPTR -- -- 7.830.452.417 -- 7.830.452.417
PT WKR -- -- 780.510.744 -- 780.510.744
Jumlah Liabilitas Pajak Tangguhan/
Total Deferred Tax Liabilities -- -- 8.610.963.161 -- 8.610.963.161

12. UANG MUKA DAN BIAYA DIBAYAR DIMUKA 12. ADVANCES AND PREPAYMENTS

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Uang Muka Kontrak 1,263,840,967,542 1,386,405,316,102 Advanced Contracts


PPN Keluaran Yang Belum Diterima 504,329,517,460 365,629,668,981 VAT Out Not Yet Received
Uang Muka Pihak Ketiga 219,381,846,549 203,730,788,655 Advance from Third Parties
Biaya Dibayar di Muka 360,770,938,220 663,205,854,749 Prepaid Expenses
Uang Muka Beban Umum Advanced for General
dan Administrasi 62,606,477,098 53,060,399,563 and Administration
Sewa 8,102,825,281 10,787,782,045 Prepaid Rent
Lain-lain 35,317,924,379 24,137,117,595 Others
Jumlah 2,454,350,496,529 2,706,956,927,690 Total

69
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Uang muka pihak ketiga diberikan kepada Advances to third parties are given to
subkontraktor, pemasok dan mandor borong yang subcontractors, suppliers and the entire stock who
bekerja pada proyek yang dilaksanakan oleh Grup. worked on the Group’s projects. The settlement of
Penyelesaian uang muka akan diperhitungkan dengan advance will be offset by the invoice that will be
termin yang akan dibayarkan kepada pihak ketiga yang paid related to third parties concerned.
bersangkutan.

Biaya dibayar dimuka merupakan biaya yang Prepayments represent the cost incurred for
dikeluarkan untuk proyek-proyek belum berjalan, biaya project not yet started, provision of Letter of Credit
provisi Letter of Credit (L/C) dan Surat Kredit (L/C) dan Surat Kredit Berdokumen Dalam Negeri
Berdokumen Dalam Negeri (SKBDN). Penyelesaian (SKBDN). Completion prepayments calculated
biaya dibayar dimuka diperhitungkan pada saat proyek when the projects start, for a fee provision is
sudah berjalan, untuk biaya provisi di akui setiap bulan. recognized each month. Value Added Tax (VAT)
Pajak Pertambahan Nilai (PPN) Keluaran belum out which not yet received represent recognition
diterima merupakan pengakuan PPN keluaran atas of VAT out on receivable, but the owner has not
termin yang telah ditagihkan, namun belum dibayar oleh paid yet.
pemberi kerja.

13. INVESTASI PADA ENTITAS ASOSIASI DAN 13. INVESTMENT IN ASSOCIATES AND JOINT
VENTURA BERSAMA VENTURES

Rincian saldo investasi pada entitas asosiasi dan The details of investments in associates and joint
ventura bersama adalah sebagai berikut: ventures are as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Investasi pada Entitas Asosiasi/ Investments in Associates 1,236,403,540,046 937,769,650,068


Investasi Ventura Bersama/ Investments in Joint Ventures 1,408,356,957,368 1,132,931,038,300
Jumlah/ Total 2,644,760,497,414 2,070,700,688,368

Investasi pada Entitas Asosiasi Investment in Associates

Rincian saldo investasi pada entitas asosiasi adalah Details of investments in associates are as follows:
sebagai berikut:
Tempat
30 Juni 2017/ 31 Desember 2016/ Aktivitas utama/ Kedudukan/
June 30, 2017 December 31, 2016 Principal activity Domicile
Rp Rp

PT Solo Ngawi Jawa 368,039,975,631 368,039,975,631 Operator Jalan Tol/ Toll road operator Indonesia
PT Ngawi Kertosono Jaya 283,455,205,220 172,316,617,220 Operator Jalan Tol/ Toll road operator Indonesia
PT Jasamarga Kualanamu Toll 241,250,000,000 -- Operator Jalan Tol/ Toll road operator Indonesia
PT Citra Waspphutowa 193,532,046,393 -- Operator Jalan Tol/ Toll road operator Indonesia
PT Cinere Serpong Jaya 86,896,870,200 86,896,870,200 Operator Jalan Tol/ Toll road operator Indonesia
PT Jasamarga Semarang Batang 54,979,442,602 54,979,442,602 Operator Jalan Tol/ Toll road operator Indonesia
PT Hutama Marga Waskita 4,500,000,000 -- Operator Jalan Tol/ Toll road operator Indonesia
PT Waskita Bali Mandara 3,750,000,000 12,729,723,363 Operator Jalan Tol/ Toll road operator Indonesia
PT Kresna Kusuma Dyandra Marga -- 239,057,021,052 Operator Jalan Tol/ Toll road operator Indonesia
PT Waskita Bumi Wira -- 3,750,000,000 Operator Jalan Tol/ Toll road operator Indonesia
Jumlah/ Total 1,236,403,540,046 937,769,650,068

Seluruh entitas asosiasi diatas dicatat dengan All of the above associates are accounted using
menggunakan metode ekuitas dalam laporan keuangan the equity method in these consolidated financial
konsolidasian ini. statements.

70
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Rincian dan mutasi investasi pada entitas asosiasi Details ownership interest and movements of
pada 30 Juni 2017 serta 31 Desember 2016 adalah investment in associates as of June 30, 2017 and
sebagai berikut: December 31, 2016 are as follows:

30 Juni 2017/June 30, 2017


Bagian laba (rugi)
Saldo awal/ entitas asosiasi/
Beginning Penambahan/ Equity in net income Penyesuaian/ Saldo akhir/
% balance Addition (loss) associates Adjustment Ending balance
Rp Rp Rp Rp Rp

PT Solo Ngawi Jaya 40 368,039,975,631 -- -- 368,039,975,631


PT Ngawi Kertosono Jaya 40 172,316,617,220 111,138,588,000 -- 283,455,205,220
PT Kresna Kusuma Dyandra Marga 60 239,057,021,052 (239,057,021,052) -- --
PT Jasamarga Kualanamu Tol *) 30 -- 161,750,000,000 79,500,000,000 -- 241,250,000,000
PT Cinere Serpong Jaya 35 86,896,870,200 -- -- 86,896,870,200
PT Jasamarga Semarang Batang 40 54,979,442,602 -- -- 54,979,442,602
PT Hutama Marga Waskita 30 -- 4,500,000,000 -- -- 4,500,000,000
PT Waskita Bali Mandara 60 3,750,000,000 -- -- -- 3,750,000,000
PT Citra Waspphutowa -- -- 193,532,046,393 -- 193,532,046,393
PT Waskita Bumi Wira **) 55 12,729,723,363 -- -- (12,729,723,363) --
Jumlah/ Total 937,769,650,068 38,331,566,948 273,032,046,393 (12,729,723,363) 1,236,403,540,046

*) Reklasifikasi dari investasi jangka panjang lainnya *) Reclassification from other long-term investments
**) Reklasifikasi ke investasi kepada entitas anak **) Reclassification to investment in subsidiary

31 Desember 2016/December 31, 2016


Bagian laba (rugi)
Saldo awal/ entitas asosiasi/
Beginning Penambahan/ Equity in net income Penyesuaian/ Saldo akhir/
balance Addition (loss) associates Adjustment Ending balance
% Rp Rp Rp Rp Rp

PT Solo Ngawi Jaya 40 264.437.387.264 97.086.532.017 6.516.056.350 - 368.039.975.631


PT Kresna Kusuma Dyandra Marga 60 - 240.000.000.000 (942.978.948) - 239.057.021.052
PT Ngawi Kertosono Jaya 40 63.893.149.868 103.644.650.457 4.778.816.895 - 172.316.617.220
PT Cinere Serpong Jaya 35 87.808.794.016 - (911.923.816) - 86.896.870.200
PT Jasamarga Semarang Batang 40 - 53.458.400.000 1.521.042.602 - 54.979.442.602
PT Waskita Bumi Wira 55 5.673.402.143 6.979.000.000 77.321.220 - 12.729.723.363
PT Waskita Bali Mandara 60 - 3.750.000.000 - - 3.750.000.000
Jumlah/ Total 421.812.733.291 504.918.582.474 11.038.334.303 - 937.769.650.068

PT Solo Ngawi Jaya (SNJ) PT Solo Ngawi Jaya (SNJ)

PT Waskita Toll Road (WTR), entitas anak, memiliki PT Waskita Toll Road (WTR), a subsidiary, has
penyertaan sebesar 40% pada SNJ atau setara investment of 40% in SNJ or equal to
Rp 166.820.000.000, berdasarkan Akta Pengambilalihan Rp 166,820,000,000, based on the Deed of
Saham No. 34, Notaris Fathiah Helmi, S.H, pada Acquisition Share No. 34 of Notary Fathiah Helmi,
tanggal 10 Juni 2015. S.H., dated June 10, 2015.

WTR menambah penyertaan pada SNJ sebesar WTR increased its investment in SNJ amounted to
Rp 96.404.000.000, berdasarkan Keputusan Sirkular Rp 96,404,000,000, based on decree of the
Rapat Umum Pemegang Saham (RUPS) tanggal 9 Juli Circular of General Meeting of Shareholders
2015. (GMS) dated July 9, 2015.

WTR menambah penyertaan melalui utang pada SNJ WTR increased more investment through a debt in
sebesar Rp 1.075.839.217, berdasarkan Berita Acara SNJ amounted to Rp 1,075,839,217, based on The
Utang-Piutang antara PT Jasa Marga (Persero) Tbk, Minutes of Debt between PT Jasa Marga (Persero)
WTR dan SNJ tanggal 30 Juni 2015. Tbk, WTR and SNJ dated June 30, 2015.

WTR menambah penyertaan pada SNJ sebesar WTR increased more investment in SNJ amounted
Rp 48.717.196.000, berdasarkan Keputusan Sirkular to Rp 48,717,196,000, based on decree of the
RUPS tanggal 11 Pebruari 2016. Circular of GMS dated February 11, 2016.

71
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

PT Ngawi Kertosono Jaya (NKJ) PT Ngawi Kertosono Jaya (NKJ)

WTR, entitas anak, memiliki penyertaan sebesar 40% WTR, a subsidiary, has investment of 40% in NKJ
pada NKJ atau setara Rp 8.780.000.000, berdasarkan or equal to Rp 8,780,000,000, based on the Deed
Akta Pengambilalihan Saham No. 35, Notaris Fathiah of Acquisition Share No. 35 of Notary Fathiah
Helmi, S.H. Helmi, S.H.

WTR menambah penyertaan melalui utang pada NKJ WTR increased its investment through a debt in
sebesar Rp 2.898.818.457, berdasarkan Keputusan NKJ amounted to Rp 2,898,818,457, based on
Sirkular Rapat Umum Pemegang Saham (RUPS) decree of the Circular of General Meeting (GMS)
tanggal 17 Juni 2015. of Shareholders dated June 17, 2015.

WTR menambah penyertaan pada NKJ sebesar WTR increased its investment in NKJ amounted to
Rp 55.435.600.000, berdasarkan Keputusan Sirkular Rp 55,435,600,000, based on decree of the
RUPS tanggal 7 Juli 2015. Circular of GMS dated July 7, 2015.

WTR menambah penyertaan pada NKJ sebesar WTR increased its investment in NKJ amounted to
Rp 19.325.680.000, berdasarkan Keputusan Sirkular Rp 19,325,680,000, based on decree of the
RUPS tanggal 11 Pebruari 2016. Circular GMS dated February 11, 2016.

WTR menambah penyertaan pada NKJ sebesar WTR increased its investment in NKJ amounted to
Rp 33.248.952.000, berdasarkan Keputusan Sirkular Rp 33.248.952.000, based on decree of the
RUPS tanggal 15 Juni 2016. Circular of GMS dated June 15, 2016.

WTR menambah penyertaan pada NKJ sebesar WTR increased its investment in NKJ amounted to
Rp 48.171.200.000, berdasarkan Keputusan Sirkular Rp 48,171,200,000, based on decree of the
RUPS tanggal 18 Agustus 2016. Circular GMS dated August 18, 2016.

WTR menambah penyertaan pada NKJ sebesar WTR increased its investment in NKJ amounted to
Rp 111.138.588.000, berdasarkan Keputusan Sirkular Rp 111,138,588,000, based on decree of the
RUPS tanggal 20 Maret 2017. Akta pengesahaan oleh Circular of GMS dated March 20, 2017. The
Menteri Hukum dan Hak Asasi Manusia Republik approval from the Minister of Law and Human
Indonesia masih dalam proses. Rights of Republic of Indonesia is still in process.

PT Kresna Kusuma Dyandra Marga (KKDM) PT Kresna Kusuma Dyandra Marga (KKDM)

WTR, entitas anak, memiliki penyertaan sebesar 60% WTR, a subsidiary, has an investment of 60% in
di KKDM. KKDM didirikan sesuai Akta Pendirian dari KKDM. KKDM was established under the Deed of
Notaris Mudofir Hadi S.H., No. 94 tanggal 20 Desember Establishment of Notary Mudofir Hadi S.H., No. 94
1996. Grup tidak melakukan konsolidasi atas laporan dated December 20, 1996. The Group has not
keuangan KKDM, meskipun memiliki kepemilikan consolidated the financial statements of KKDM,
mayoritas. although it has a majority ownership.

Hal ini berdasarkan Perjanjian Tambahan (Adendum) It is based on the Addition of Agreement
tanggal 9 Desember 2014 dari Notaris Jose Dima (Addendum) dated December 9, 2014 from Jose
Satria S.H., M.Kn, Notaris di Jakarta, atas Perjanjian Dima Satria S.H., M.Kn, Notary in Jakarta, on the
Jual Beli Bersyarat Dengan Hak untuk Membeli Conditional Sale and Purchase Agreement with the
Kembali Atas Saham-saham. Dalam perjanjian tersebut Right to Buy Back on Shares. In the agreement it
disepakati bahwa pengendalian atas KKDM tetap was agreed that control over KKDM remains with
berada pada PT Tirtobumi Prakarsatama (Tirto), PT Tirtobumi Prakarsatama (Tirto), including the
meliputi aspek keuangan, operasional dan sumber aspects of financial, operational and human
daya manusia KKDM, menunjuk atau mengganti resources of KKDM, appoint or change the
organisasi KKDM dan tindakan lainnya harus meminta organization of KKDM and other decision shall
persetujuan tertulis sebelumnya dari Direksi dan obtain written approval from the Board of Directors
anggota Komisaris dari Tirto. and members of Commissioners of Tirto.

72
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

PT Jasamarga Kualanamu Tol (JMKT) PT Jasamarga Kualanamu Tol (JMKT)

WTR, entitas anak, memiliki penyertaan sebesar 30% WTR, a subsidiary, has investments of 30% in
di JMKT atau sebesar Rp 31.250.000.000. JMKT JMKT Rp 31,250,000,000. JMKT was established
didirikan sesuai Akta Pendirian dari Notaris Ni Nyoman based on the Notarial Deed of Ni Nyoman Rai
Rai Sumawati, S.H., No. 56 tanggal 25 Nopember Sumawati, S.H., No. 56 dated November 25, 2014
2014, bergerak di bidang pengusahaan jalan. engaged in toll road.

WTR menambah penyertaan pada JMKT sebesar WTR increased its investment in JMKT amounted
Rp 10.050.000.000 berdasarkan Keputusan Sirkular to Rp 10,050,000,000, based on decree of the
RUPS tanggal 23 Januari 2016. Circular of GMS dated January 23, 2016.
WTR menambah penyertaan pada JMKT sebesar WTR increased its investment in JMKT amounted
Rp 18.450.000.000 berdasarkan Keputusan Sirkular to Rp 18,450,000,000, based on decree of the
RUPS tanggal 16 Mei 2016. Circular of GMS dated May 16, 2016.
WTR menambah penyertaan pada JMKT sebesar WTR increased its investment in JMKT amounted
Rp 18.000.000.000 berdasarkan Keputusan Sirkular to Rp 18,000,000,000, based on decree of the
RUPS tanggal 22 Juli 2016. Circular of GMS dated July 22, 2016.
WTR menambah penyertaan pada JMKT sebesar WTR increased its investment in JMKT amounted
Rp 19.500.000.000 berdasarkan Keputusan Sirkular to Rp 19,500,000,000, based on decree of the
RUPS pada Januari 2017. Circular of GMS in January 2017.
Pada tanggal 24 Maret 2017, WTR membeli saham On March 24, 2017, WTR bought the shares of
JMKT yang dimiliki oleh Perusahaan sebesar JMKT owned by the Company amounted to
Rp 85.000.000.000, sehingga kepemilikan menjadi Rp 85,000,000,000. This increased the Company’s
30%, sesuai dengan Akta dari Notaris Ni Nyoman Rai partcipation to 30%, based on the Notarial Deed of
Sumawati, S.H., M.Kn No. 22. Akta pengesahaan oleh Ni Nyoman Rai Sumawati, S.H., M.Kn No. 22. The
Menteri Hukum dan Hak Asasi Manusia Republik deed of approval by the Minister of Law and
Indonesia masih dalam proses. Human Rights of the Republic of Indonesia is still
in process.

PT Cinere Serpong Jaya (CSJ) PT Cinere Serpong Jaya (CSJ)

WTR, entitas anak, memiliki penyertaan sebesar 35% WTR a subsidiary, has investment of 35% in CSJ
pada CSJ atau setara Rp 70.000.000.000, berdasarkan or equal to Rp 70,000,000,000, based on the Deed
Akta Pengambilalihan Saham No. 35 oleh Notaris Jose of Acquisition Share No. 35 of Notary Jose Dima
Dima Satria, S.H., M.Kn. Satria, S.H., M.Kn.

WTR menambah penyertaan pada CSJ sebesar WTR increased investment in CSJ amounted to
Rp 7.031.843.000, berdasarkan Surat Permintaan Rp 7,031,843,000, based on the Letter for request
Setoran Modal Perseroan tanggal 6 Juli 2015. of Capital Subscription dated July 6, 2015.

WTR menambah penyertaan melalui utang pada CSJ WTR increased its investment through a debt in
sebesar Rp 11.513.843.037, berdasarkan Berita Acara PT Cinere Serpong Jaya amounted to
Utang-Piutang Antara PT Jasa Marga (Persero) Tbk, Rp 11,513,843,037, based on The Minutes of Debt
WTR, PT Jakarta Propertindo dan CSJ tanggal 31 Juli between PT Jasa Marga (Persero) Tbk, WTR,
2015. PT Jakarta Propertindo and CSJ dated July 31,
2015.

PT Jasamarga Semarang Batang (JMSB) PT Jasamarga Semarang Batang (JMSB)

WTR, entitas anak, memiliki penyertaan sebesar 40% WTR, a subsidiary, has investment of 40% in
pada JMSB atau setara Rp 44.182.400.000. JMSB equal to Rp 44,182,400,000. The Company
Perusahaan ini didirikan sesuai Akta Pendirian No. 128 was established under the Notarial Deed of
tanggal 21 April 2016 dari Notaris Haji Rizul Sudarmadi, Establishment No. 128, dated April 21, 2016 of
S.H., bergerak di bidang jalan tol. Notary Haji Rizul Sudarmadi, S.H., engaged in toll
road.

73
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

PT Hutama Marga Waskita (HMW) PT Hutama Marga Waskita (HMW)

WTR, entitas anak, memiliki penyertaan sebesar 30% WTR, a subsidiary, owns investment equivalent to
dari modal HMW atau sebesar Rp 4.500.000.000. 30% in HMW Rp 4,500,000,000. HMW was
HMW didirikan sesuai Akta Pendirian No. 24 tanggal established based on the Notarial Deed No. 24
20 Pebruari 2017 dari Notaris Ni Nyoman Rai dated February 20, 2017 of Notary Ni Nyoman Rai
Sumawati, S.H., M.Kn, bergerak di bidang Sumawati, S.H., M.Kn and engaged in toll road
pengusahaan jalan tol. concession.

PT Waskita Bali Mandara (WBM) PT Waskita Bali Mandara (WBM)

WTR, entitas anak, memiliki penyertaan sebesar 60% WTR, a subsidiary, has investment of 60% in
pada WBM. WBM didirikan sesuai Akta Pendirian No. 6 WBM. WBM was established under the Deed of
tanggal 13 Nopember 2015 dari Notaris Jose Dima Establishment No. 6 dated November 13, 2015 of
Satria, S.H., M.Kn. WTR tidak mengendalikan atau Notary Jose Dima Satria, S.H., M.Kn. WTR has no
mengendalikan bersama atas kebijakan WBM, control or joint control over WBM’s policies,
meskipun memiliki kepemilikan mayoritas. although it has a majority ownership.

PT Waskita Bumi Wira (WBW) PT Waskita Bumi Wira (WBW)

WTR, entitas anak, memiliki penyertaan sebesar 48% WTR, a subsidiary, has investment of 48% in
pada WBW setara Rp 7.500.000.000, berdasarkan Akta WBW equal to Rp 7,500,000,000, based on the
Notaris No. 43 tanggal 28 Oktober 2014 dari Notaris Notarial Deed No. 43 dated October 28, 2014 of
Jose Dima Satria, SH., M.Kn. Notary Jose Dima Satria, SH., M.Kn.

Pada tanggal 9 Mei 2016, WTR membeli saham WBW On May 9, 2016, WTR acquired shares of
yang dimiliki oleh PT Energi Bumi Mining sebesar WBW owned by PT Energi Bumi Mining amounted
Rp 1.094.000.000, sehingga kepemilikan menjadi 55% to Rp 1,094,000,000, thus the Company has
berdasarkan Keputusan Sirkular RUPS tangal 3 Mei ownership of 55% based on Decree of The
2016. Circular of GMS dated May 3, 2016.

WTR menambah penyertaan pada WBW sebesar WTR increased its investment in WBW amounted
Rp 1.375.000.000, berdasarkan Keputusan Sirkular to Rp 1,375,000,000, based on Decree of the
RUPS tanggal 22 Juni 2016. Circular of GMS dated June 22, 2016.

WTR tidak melakukan konsolidasi atas laporan WTR has not consolidated the financial statements
keuangan WBW, meskipun memiliki kepemilikan of WBW, although it has a majority ownership. It is
mayoritas. Hal ini berdasarkan Akta No. 5 tanggal based on the Deed No. 5 dated April 4, 2016 from
4 April 2016 dari Notaris Jose Dima Satria, S.H, M.Kn. Notary Jose Dima Satria, S.H., M.Kn, Notary in
Notaris di Jakarta, atas Perjanjian Tambahan Mengenai Jakarta, on the Addition of Buy Back Agreement
Jual Beli Kembali, dimana PT Energi Bumi Mining which PT Energi Bumi Mining has the shares
memiliki opsi saham untuk membeli kembali transfer option to buy back the 7% transfer of ownership
kepemilikan 7% dari WBW sampai dengan from WBW until December 31, 2016. After that
31 Desember 2016. Setelah periode tersebut opsi period the shares option willl be expired and WBW
saham tersebut akan hangus dan WBW akan will be consolidated (Note 1).
dikonsolidasi (Catatan 1).

Manajemen berpendapat tidak terdapat harga kuotasi Management believes there is no active market
dipasar aktif atas nilai wajar investasi pada entitas price quotations in the fair value of investment in
asosiasi dan teknik penilaian tidak dapat digunakan, associates and valuation techniques can not be
sehingga nilai wajar investasi diukur dengan biaya used, so fair value of the investment is measured
perolehan. at acquisition cost.

Ringkasan informasi keuangan masing-masing entitas Summarized financial information in respect of


asosiasi ditetapkan dibawah ini. Ringkasan informasi each of the associates are set out below. The
keuangan dibawah ini merupakan jumlah yang summarized financial information below represents
disajikan dalam laporan keuangan entitas asosiasi yang amounts shown in the associates’ financial
disusun sesuai dengan Standar Akuntansi Keuangan statements prepared in accordance to Indonesian
Indonesia. Financial Accounting Standards.

74
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

PT Kresna Kusuma
PT Solo Ngawi Jaya PT Ngawi Kertosono Jaya Dyandra Marga
2017 2016 2017 2016 2017 2016
Rp Rp Rp Rp Rp Rp

Aset lancar 324.033.972.222 403.989.990.703 499.293.781.366 285.701.840.329 605.250.155.312 365.674.764.553 Current assets
Aset tidak lancar 3.484.574.130.406 3.306.294.130.168 2.460.520.217.115 1.982.366.046.175 4.383.695.301.390 4.230.519.119.718 Non-current assets

Liabilitas jangka pendek 1.361.033.263.794 1.489.015.335.410 1.342.804.223.580 1.028.984.027.259 4.373.333.692.128 3.985.360.133.598 Current liabilities
Liabilitas jangka panjang 1.532.200.864.801 1.310.102.997.309 855.872.669.827 759.905.603.765 144.033.699.978 139.441.134.990 Non-current liabilities
Laba (rugi) periode berjalan 4.208.185.880 2.061.774.876 4.112.379.594 389.836.141 185.448.913 (639.987.287) Profit (loss) for the period

Investasi pada Ventura Bersama Investment in Joint Ventures

Rincian saldo investasi ventura bersama dengan pihak Details of investment in joint ventures with related
berelasi adalah sebagai berikut: parties are as follows:

30 Juni 2017/ June 30, 2017


Proyek/ Project Persentase/ Saldo Awal/ Setoran (Penarikan)/ Pengakuan Laba Saldo Akhir/
Percentage Beginning Balance Koreksi/ Placement (Rugi)/ Ending Balance
(Withdrawal)/ Gain (Loss)
Correction Recognition
% Rp Rp Rp Rp
Pihak Berelasi/ Related Parties

KSO/JO Waskita - HK - Wika Bandara Samarinda 43% 78,634,531,475 (3,285,880,256) 77,662,479 75,426,313,698
KSO/JO Waskita - Wika Aksesibilitas Ducting Utility 49% 20,465,666,379 -- 1,511,670,181 21,977,336,560
KSO/JO Waskita - Wika Sabo Dam Paket 1 57% 19,969,525,243 -- -- 19,969,525,243
KSO/JO Waskita - Brantas Sabo Dam Merapi 14 buah 49% 19,645,779,654 -- -- 19,645,779,654
KSO/JO Waskita - NK Jalan Batu Aji Kuaro 60% -- 18,479,976,304 9,902,220,526 28,382,196,830
KSO/JO Waskita - Brantas - Wika Bendung Gerak Sembayat 33% -- 14,623,269,416 6,827,702,071 21,450,971,487
KSO/JO Waskita - Yodya Karya Bandara Husein 99% 11,746,111,998 (215,004,435) 307,755,522 11,838,863,085
KSO/JO Waskita - Penta Lansekap Bandara Soetta 98% 10,960,754,135 984,911,647 3,103,974,792 15,049,640,574
KSO/JO Waskita - Wika - Nindya Soker MYC 31% 10,798,405,749 -- 3,107,052,575 13,905,458,324
KSO/JO Waskita - Brantas Rekons. Sabo Dam Merapi 51% 8,827,943,454 -- -- 8,827,943,454
KSO/JO Waskita - PP BPK RI 56% 8,351,731,177 -- -- 8,351,731,177
KSO/JO Waskita - PP - Hutama Jembt. Siak IV 35% 8,074,177,465 (6,459,341,972) -- 1,614,835,493
KSO/JO Waskita - Adhi Pengaman Pantai Jakarta Tahap 2 Paket 1 45% 8,057,939,067 -- 4,183,624,417 12,241,563,484
KSO/JO Waskita - Wika - PP - HK Jatigede Sumedang 25% 7,448,173,986 -- -- 7,448,173,986
KSO/JO Waskita - HK Normalisasi Kali Ciliwung 51% 6,540,288,975 (2,040,000,000) 1,129,911,799 5,630,200,774
KSO/JO Waskita - Brantas Rekons. Sabo Dam Merapi 51% 6,322,123,452 -- -- 6,322,123,452
KSO/JO Waskita - Wika Run Way SSK II 51% 3,900,355,756 (1,421,199,956) -- 2,479,155,800
KSO/JO Waskita - Hutama Manado - Bitung (Air Madidi) 45% 3,519,216,387 (3,519,216,387) 386,797,549 386,797,549
KSO/JO Waskita - Wika Jalan Tol Ciawi Sukabumi seksi 1 51% 3,107,279,797 (3,107,279,797) -- --
KSO/JO Waskita - PP Bendung Batang Sinamar 40% -- 2,549,560,429 491,127,688 3,040,688,117
KSO/JO Waskita - Wika RSUD Pasar Minggu 40% 2,360,527,445 (984,911,647) -- 1,375,615,798
KSO/JO Waskita - PP Jembatan Sungai Brantas 43% 2,245,752,872 (2,984,883,307) -- (739,130,435)
KSO/JO Waskita - Adhi - PP Jl. SS Karawang 33% 1,920,444,883 (1,920,444,883) -- --
KSO/JO Waskita - PP Jembatan Sungai Brantas 43% 1,909,534,795 (1,909,534,795) -- --
KSO/JO Waskita - Adhi Kali Lamong 55% 1,794,983,751 -- -- 1,794,983,751
KSO/JO Waskita - Taruna Putra Pertiwi DI Colo 70% -- 1,298,415,718 1,402,940,171 2,701,355,889
KSO/JO Waskita - Brantas Bendung Gerak Tempe 50% 1,226,486,420 -- -- 1,226,486,420
KSO/JO Waskita - PP Kamijoro 51% 355,716,590 1 (2,202,134,384) (1,846,417,793)
KSO/JO Waskita - PP Pkt 3 - Solo Kertosono 43% 191,424,924 500,000,000 -- 691,424,924
KSO/JO Waskita - Brantas Jalan Bantaeng - Bulukumba 65% -- 955,705,671 -- 955,705,671
KSO/JO Waskita - Adhi Irigasi Sampean (Pirimp) Situbondo 45% (87,906,454) (381,758,153) -- (469,664,607)
KSO/JO Waskita - Citra Mandiri Lakitan 70% (104) (104,213,503) 1,552,513,725 1,448,300,118
KSO/JO Waskita - Adhi - HK - Wika Suramadu CIC 25% (2,598,000,000) 2,598,000,000 -- --
KSO/JO Waskita - BAP Bendungan Tapin 49% (4,232,496,189) -- 6,012,171,460 1,779,675,271
KSO/JO Waskita - Indah Karya Ciasem Pamanukan 97% (5,971,005,537) -- (5,971,005,537)
KSO/JO Waskita - Brantas Pandan Duri II 51% (16,591,018,687) -- -- (16,591,018,687)
KSO/JO Waskita - Indah Karya Ciasem Pamanukan 97% (16,966,915,735) -- -- (16,966,915,735)
KSO/JO Waskita - PP - HK Jl. Tol Depok-Antasari (Desari) 34% (23,568,653,672) (331,487,250) -- (23,900,140,922)
KSO/JO Waskita - PP - Wika Jembatan Merah Putih 34% (114,659,665,704) 11,400,098,851 (11,400,000,000) (114,659,566,853)
KSO/JO Waskita - Wika Runway BDR Samarinda Baru -- -- -- --
KSO/JO Waskita - Adhi Bendungan Way Sekampung (Paket 2) 6205% -- -- 2,729,988,978 2,729,988,978
KSO/JO Waskita - Adhi Bendungan Leuwi Keris Paket 2 70% -- -- 369,005,456 369,005,456
KSO/JO Waskita - WIKA Jalan Tol Seksi-1 Ciawi - cigombong/Lido (Paket 1) -- 5,607,816,617 14,837,902,165 20,445,718,782
PT. Jasamarga Jalan layang Cikampek - KSO Jalanlayang Cikampek - KSO 9,461,313,000 (4,327,189,853) 5,134,123,147

Sub Jumlah/ Sub Total 63,699,213,747 39,793,911,313 40,004,697,317 143,497,822,377

75
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Rincian saldo investasi ventura bersama dengan pihak Details of investment in joint ventures with third
ketiga adalah sebagai berikut: parties are as follows:

30 Juni 2017/ June 30, 2017


Proyek/ Project Persentase/ Saldo Awal/ Setoran (Penarikan)/ Pengakuan Laba Saldo Akhir/
Percentage Beginning Balance Koreksi/ Placement (Rugi)/ Ending Balance
(Withdrawal)/ Gain (Loss)
Correction Recognition
% Rp Rp Rp Rp
Pihak Ketiga/ Third Parties

KSO/JO WKR - Asiana Virro Senopati 51% 338,711,013,572 4,701,134,297 6,573,609,077 349,985,756,946
KSO/JO WKR - Darmo Permai Segi 88 Avenue 51% 260,261,272,475 8,187,836,252 2,145,929,810 270,595,038,537
KSO/JO Waskita - Wika - PP - Jaya Gd. Terminal 3 45% 95,108,488,231 769,866,663 18,955,958 95,897,310,852
KSO/JO Waskita - Triniti Alam Sutra 51% 92,691,467,305 -- 126,049,675 92,817,516,980
KSO/JO WKR - Dalawa Zallaka - Batu Tumpeng 41% 75,737,010,225 6,732,897,660 3,622,836,621 86,092,744,506
KSO/JO WKR - Sirius Yukata Suites 51% 74,953,088,246 10,507,031 2,646,329,046 77,609,924,323
KSO/JO WKR - Ekatama Apartemen Pejaten 60% -- 129,858,068,999 3,054,292 129,861,123,291
KSO/JO WKR - RNI RNI Office Park 96% -- 1,418,921,967 (912,957) 1,418,009,010
KSO/JO Waskita - JPC SMM Muara Teweh Div.Sipil 68% 61,687,353,440 3,330,691,800 -- 65,018,045,240
KSO/JO Waskita - Brantas Terminal Selatan Bandara Djuanda (Thp 2) 80% 36,538,276,678 -- -- 36,538,276,678
KSO/JO Waskita - Arkonin Renov. Bandara Ngurah Rai 70% 32,028,251,260 (37,879) 32,028,213,381
KSO/JO Waskita - Basuki Rahmana Putra Dredging & Embankmen 60% -- 21,328,737,599 -- 21,328,737,599
KSO/JO Waskita - Yasa Jl. Galing Aruk 100% 20,748,285,170 -- 8,776,627,368 29,524,912,538
KSO/GO WBP - Jakon Normalisasi Turap Pasar Lama 60% 17,819,135,117 (7,151,852,996) -- 10,667,282,121
KSO/JO Waskita - Wika - Shanghai Jl. Tol Cisumdawu 10% 7,312,086,132 -- (2,620,514,232) 4,691,571,900
KSO/JO Waskita - Bawakaraeng Irigasi D.I. Batang Alay 70% 7,140,621,695 (1) 2,028,235,015 9,168,856,709
KSO/JO Waskita - Wika - IPA Dermaga Semarang 33% 6,101,466,165 -- -- 6,101,466,165
KSO/JO Waskita - IHC Pengadaan Dredger 99% 6,057,872,365 -- -- 6,057,872,365
KSO/JO Waskita - Baswara - Mahir Jaya Tulur Aji Jangkat 100% 5,805,911,452 -- -- 5,805,911,452
KSO/JO Waskita - Sinar Intan PDAM Tanah Grogot 75% 5,658,241,837 -- -- 5,658,241,837
KSO/JO Waskita- Daelim - Wika Karian Multipurpose Dam Project 65% 5,031,789,611 -- 2,589,958,690 7,621,748,301
KSO/JO Waskita - Cempaka Bendung Baliase 55% 4,856,834,059 -- 3,030,507,617 7,887,341,676
KSO/JO Waskita - Luhribu Reservoir Bdg MA Kayu 55% 4,529,077,329 -- -- 4,529,077,329
KSO/JO Waskita - Abdi Mulia Berkah Sal Primer Jabung II 70% -- 14,623,385,123 1,132,803,631 15,756,188,754
KSO/JO Waskita - Usaha Batanghari Jembt. Muara Sabak 63% 3,543,677,424 -- -- 3,543,677,424
KSO/JO Waskita - Witada Bangun Gemilang Timbunan Tanah Bandara Mutiara 55% 3,509,212,953 -- -- 3,509,212,953
KSO/JO Waskita - Siwa Prestasi Faspela Pantoloan 2013 55% 2,991,566,035 -- -- 2,991,566,035
KSO/JO Waskita - Panca Duta Peningktn Jln Kambuaya-Klamono 51% 2,829,354,310 -- -- 2,829,354,310
KSO/JO Waskita - Adi Jaya Lima Pradana Pengendalian Sedimen Bawakaraeng 55% 2,790,349,272 -- -- 2,790,349,272
KSO/JO Waskita - PP - Deltamarga Jl. Pesisir (Coastel Road Construction) 45% 2,784,798,707 308,429,626 -- 3,093,228,333
KSO/JO Waskita - HK Sal Induk Siderejo 51% 3,398,250,480 -- 2,064,301,670 5,462,552,150
KSO/JO Waskita - Lombok I.P Jln Gerung - Mataram 4 51% 2,722,234,086 -- -- 2,722,234,086
KSO/JO Waskita - Yasa Bandara Kalimarau 55% 2,500,536,820 (2,500,536,820) -- --
KSO/JO Waskita - metallungical - Wika - NK Jl Tol Cisumdawu Phase 2 8% 1,965,713,886 (1,965,713,886) 514,433,445 514,433,445
KSO/JO Waskita - JPC SMM Muara Teweh Div EPC 68% 1,658,179,841 (3,552,249,721) -- (1,894,069,880)
KSO/JO Waskita - Nindya - Sacna Irigasi Sapon 40% 1,296,132,700 -- -- 1,296,132,700
KSO/JO Waskita - Rindang Jl T Besar Bujung Tenuk 55% 1,052,050,539 (1,052,050,539) -- --
KSO/JO Waskita - Tepat Guna Pelebaran Jl Ampenan-Pemenang 51% 651,113,247 -- -- 651,113,247
KSO/JO Waskita - IHC Pengadaan Dredger 99% 327,351,926 (327,351,926) -- --
KSO/JO Waskita - Eka Praya Jl. Akses Bill Thp II 51% 200,000,000 -- -- 200,000,000
KSO/JO Waskita - Modern Dermaga Peti Kemas (CY-01) 60% 157,345,739 (4,747,226,519) -- (4,589,880,780)
KSO/JO Waskita - Lombok I.P Jembatan Padolo Cs 51% 62,219,661 -- -- 62,219,661
KSO/JO Waskita - Ricky Kencana Underpass Simpang Patai-Pusri 70% 1,134,927 (1,134,927) -- --
KSO/JO Waskita - Tirta Struktur Dalam Jl. Pontianak 67% (44,888) -- -- (44,888)
KSO/JO Waskita - CPA Sandai Nanga Tayap Kalbar 65% (433,926) -- -- (433,926)
KSO/JO Waskita - Pangkho BNN Makassar 75% (21,191,162) -- -- (21,191,162)
KSO/JO Waskita - Jaya - Nusantara Jl. Arteri Siring - Porong Paket 1 80% (32,628,891) -- -- (32,628,891)
KSO/JO Waskita - Lombok I.P Jembatan Sori Lan Cs 51% (62,219,661) -- -- (62,219,661)
KSO/JO Waskita - Surya Bakti Jalan Pendekat Mahakam IV Sisi Samarinda Kota (MYC)60% (145,149,760) 1,909,534,789 6,414,974,944 8,179,359,973
KSO/JO Waskita - Kega Harris Hotel Yogya 70% (168,986,561) -- -- (168,986,561)
KSO/JO Waskita - Indopenta Drainase Pekalongan 60% (282,000,000) (18,000,000) -- (300,000,000)
KSO/JO Waskita - Tokyo FO Merak Balaraja 40% (982,365,052) 1,670,224,251 -- 687,859,199
KSO/JO Waskita - Feberco PLN Curup 60% -- (1,982,834,853) (74,843,314) (2,057,678,167)
KSO/JO Waskita - Larasati Pengend Banjir Karang Asam 55% (1,604,585,800) -- -- (1,604,585,800)
KSO/JO Waskita - Rimba - Marinda Tol Balikpapan-Samarinda 51% (2,130,903,250) -- -- (2,130,903,250)
KSO/JO Waskita - CPA Spam Samarinda Utara 65% (3,939,456,385) -- -- (3,939,456,385)
KSO/JO Waskita - Perdasa - Buluh - Larasati Jl. Talisayan - Batu Lepok 30% (4,330,834,275) -- -- (4,330,834,275)
KSO/JO Waskita - Wika - IPA Dermaga Semarang 33% (4,747,226,520) 4,747,226,520 -- --
KSO/JO Waskita - Daya Mulia Turangga Ipuh Bantal Roads 60% (6,862,170,380) -- -- (6,862,170,380)
KSO/JO Waskita - ZUG PLTU Rote 40% (9,092,558,766) 549,116,106 -- (8,543,442,660)
KSO/JO Waskita - Yasa Bandara Kuala namu 70% (9,244,526,918) 10,676,454,723 (9,745,139,982) (8,313,212,177)
KSO/JO Waskita - Andesmont Jl. Kebayan - Simpang Kraft 70% -- (11,802,540,050) -- (11,802,540,050)
KSO/JO Waskita - PAL PLTU Malinau 75% (44,397,017,721) -- -- (44,397,017,721)
KSO/JO Waskita - Kajima E2 Cilincing - Jampea 40% (35,942,640,448) 33,501,589,425 (43,558,948,977) (46,000,000,000)
KSO/JO Waskita - Gorip Nanda Guna Jl. Gempor Paket 2 Porong-Kejapan 60% -- -- 715,970,328 715,970,328

Sub Jumlah/ Sub Total 1,069,231,824,553 209,223,130,593 (13,595,820,154) 1,264,859,134,992

Jumlah/ Total 1,132,931,038,300 249,017,041,906 26,408,877,163 1,408,356,957,369

76
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Tidak terdapat perubahan kepemilikan atau hak suara There has been no change in the Group's
Grup untuk tahun-tahun yang dilaporkan. ownership or voting interests in these joint
ventures for the reported years.

Seluruh entitas asosiasi yang dicatat dengan All of the above associates are accounted for using
menggunakan metode ekuitas dalam laporan keuangan the equity method in these consolidated interim
interim konsolidasian ini. financial statements.

Operasi bersama Joint Operation

Perusahaan mempunyai 15% bagian dalam Perjanjian The Company has a 15% share in the Consortium
Pembentukan Konsorsium Dalam Rangka Pelaksanaan Agreement for the Construction of Multiurpose Port
Pekerjaan Pembangunan Terminal Multipurpose dan and Support Facilities at the Port of Kuala Tanjung
Fasilitas Pendukung di Pelabuhan Kuala Tanjung di in North Sumatera Province. The Company is
Propinsi Sumatera Utara. Perusahaan berhak atas entitled to a proportionate share of the income and
proporsi bagian dari penghasilan dan dikenakan bears a proportionate share of the joint operating’s
proporsi bagian dari biaya operasi bersama. expenses.

14. PROPERTI INVESTASI 14. INVESTMENT PROPERTIES

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Harga Perolehan Acquisition Cost
Tanah 22,187,309 107,994,333 Land
Bangunan 34,437,486,273 167,620,750,539 Building
Jumlah Harga Perolehan 34,459,673,582 167,728,744,872 Total Acquisition Cost

Nilai Wajar Fair Value


Tanah 16,272,574,198 79,205,000,000 Land
Bangunan 37,137,956,882 180,765,000,000 Building
Total Nilai Wajar 53,410,531,080 259,970,000,000 Total Fair Value
Pengurangan -- (206,559,468,920) Deduction
Jumlah Properti Investasi 53,410,531,080 53,410,531,080 Total Investment Properties

Properti investasi merupakan proyek gedung Property investments consist of office building and
perkantoran dan hotel Cawang dalam pengembangan, Cawang hotel project under development, located
yang berlokasi di Jalan MT Haryono Cawang, dengan in Jalan MT Haryono Cawang, lying on a land area
luas lahan sebesar 3.650m2. of 3,650sqm.

Terdapat pengalihan properti investasi milik There is a transfer of the Company’s investment
Perusahaan menjadi penambahan penyertaan pada properties as an additional investment in WKR a
WKR, entitas anak, melalui pengalihan kepemilikan subsidiary, through transfer of ownership (inbreng),
(inbreng) berdasarkan akta notaris Yusdin Fahim, S.H., based on notarial deed by Notary Yusdin Fahim,
No. 19 tanggal 26 Pebruari 2016 dengan nilai wajar S.H,. No. 19 dated February 26, 2016 with fair
sebesar Rp 259.241.255.128. value of Rp 259,241,255,128.

Pada tahun 2016, berdasarkan surat persetujuan dari In 2016, based on approval letter from the
Komisaris WKR No. 001.1/WKR/DK/2016, terdapat Commissioners of WKR No. 001.1/WKR/DK/2016,
persetujuan pengalihan sebagian dari properti investasi there are approval to transfer a portion of
dengan nilai Rp 206.559.468.920 untuk dialihkan investment properties amounted to
sebagai aset tetap yang peruntukkan sebagai hotel, Rp 206,559,468,920, to be transferred as fixed
pengalihan ini disajikan dalam penambahan aset tetap assets with it’s designation as hotel, this transfer
(Catatan 16). presented in addition of fixed assets (Note 16).

Pada tanggal 30 Juni 2017 dan 31 Desember 2016, As of June 30, 2017 and December 31, 2016, the
nilai wajar properti investasi WKR, entitas anak adalah fair value of the investment properties WKR, a
masing-masing sebesar Rp 53.410.531.080 subsidiary amounted to Rp 53,410,531,080,
berdasarkan laporan penilaian tertanggal 25 Januari respectively, and has been arrived based on the
2016 dari KJPP Desmar & Rekan, penilai independen. valuation report dated January 25, 2016 of KJPP
Penilaian dilakukan berdasarkan Pendekatan Data Desmar & Rekanan, independent appraiser. The
Pasar. valuation was based on Market Data Approach.

77
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

15. INVESTASI JANGKA PANJANG LAINNYA 15. OTHER LONG-TERM INVESTMENTS

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

PT Prima Multi Terminal 212,622,000,000 212,622,000,000 PT Prima Multi Terminal


PT Citra Waspphutowa -- 193,532,046,393 PT Citra Waspphutowa
PT Jasamarga Kualanamu Tol -- 142,250,000,000 PT Jasamarga Kualanamu Tol
PT Citra Karya Jabar Tol 15,000,000,000 -- PT Citra Karya Jabar Tol

Jumlah 227,622,000,000 548,404,046,393 Total

Rincian mutasi investasi jangka panjang lainnya The detail of mutation of other long-term
sebagai berikut: investment are as follows:

Penambahan
Persentase Saldo Awal/ (Pengurangan) Saldo Akhir
Kepemilikan/ Beginning Balance Addition (Deduction) 30 Juni 2017/
Percentage of 31 Desember 2016/ 30 Juni 2017/ Ending Balance
Ownership December 31, 2016 June 30, 2017 June 30, 2017
% Rp Rp Rp

PT Prima Multi Terminal 20000% 212,622,000,000 -- 212,622,000,000 PT Prima Multi Terminal


PT Citra Wasphutowa 12050% 193,532,046,393 (193,532,046,393) -- PT Citra Wasphutowa
PT Jasamarga Kualanamu Tol 15000% 142,250,000,000 (142,250,000,000) -- PT Jasamarga Kualanamu Tol
PT Citra Karya Jabar Tol 15000% -- 15,000,000,000 15,000,000,000 PT Citra Karya Jabar Tol

Jumlah 548,404,046,393 (320,782,046,393) 227,622,000,000 Total

*) Reklasifikasi ke investasi pada Entitas Asosiasi *) Reclassified to Investments in Associates

PT Prima Multi Terminal (PMT) PT Prima Multi Terminal (PMT)

Perusahaan memiliki penyertaan sebesar 20,00% pada The Company has investments of 20.00% in PMT
PMT atau setara Rp 26.100.000.000. Perusahaan ini or equal to Rp 26,100,000,000. The company was
didirikan sesuai Akta Pendirian No. 04 tanggal established under the Notarial Deed of
26 September 2014 dari Notaris Tuti Sumarni, S.H., Establishment No. 04 dated September 26, 2014
MH, bergerak di bidang perdagangan dan jasa. of Notary Tuti Sumarni, S.H., MH, engaged in
trading and services.

Berdasarkan Akta No. 6 tanggal 16 Desember 2015 Based on Notarial Deed No. 6 dated December 16,
dari notaris Tuti Sumarni, S.H., MH, PT Perumahan 2015 of notary Tuti Sumarni, S.H., MH,
Pembangunan Tbk melakukan penjualan sebagian PT Perumahan Pembangunan Tbk sale some of
saham sebanyak 5% yang dimiliki didalam PMT atau its own shares on PMT amounted to 5% or
sebesar Rp 9.150.000.000. equivalent to Rp 9,150,000,000.

PT Citra Waspphutowa (CW) PT Citra Waspphutowa (CW)

Perusahaan dan WTR masing-masing memiliki The Company and WTR each owns investment of
penyertaan sebesar 12,50% pada CW atau setara 12.50% in CW or equivalent to Rp 50,000,000,000.
Rp 50.000.000.000 yang didirikan sesuai Akta This entity was established based on the Notarial
Pendirian No. 10 tanggal 13 Januari 2006 dari Notaris Deed No. 10 dated January 13, 2006 of Notary
Drs. Soegeng Santosa, S.H., MH, bergerak di bidang Drs. Soegeng Santosa, S.H., MH, engaged in toll
pengusahaan jalan tol. concession right.
PT Citra Karya Jabar Tol (CKT) PT Citra Karya Jabar Tol (CKT)

WTR memiliki penyertaan sebesar 15,00% dari modal WTR owns investment equivalent to 15.00% of
CKT atau sebesar Rp 15.000.000.000. PT Citra Karya CKT paid in capital or Rp 15,000,000,000.
Jabar Tol didirikan sesuai Akta Pendirian No. 18 PT Citra Karya Jabar Tol was established based
tanggal 30 Januari 2017 dari Notaris Dessi, S.H., on the Notarial Deed No. 18 dated January 30,
M.Kn., bergerak di bidang pengusahaan jalan tol. 2017 of Dessi, S.H., M.Kn. and engaged in toll
road concession.

78
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

16. ASET TETAP - BERSIH 16. FIXED ASSETS - NET

30 Juni 2017/ June, 30 2017


Saldo Awal/ Penambahan/ Pengurangan/ Hapus buku/ Saldo Akhir/
Beginning Balance Addition Deduction Written Off Ending Balance
Rp Rp Rp Rp Rp

Biaya Perolehan Acquisition Cost


Tanah 967,913,020,311 21,099,631,788 -- -- 989,012,652,099 Land
Gedung 316,814,062,131 44,372,005,736 -- -- 361,186,067,867 Building
Pabrik 354,781,322,737 -- -- -- 354,781,322,737 Plant
Perlengkapan Kantor 33,393,768,285 9,745,089,629 -- -- 43,138,857,914 Office Supplies
Peralatan Proyek 1,427,356,521,367 180,883,359,816 -- -- 1,608,239,881,183 Project Equipments
Kendaraan 27,062,882,568 2,348,199,596 -- -- 29,411,082,164 Vehicles
Jumlah 3,127,321,577,399 258,448,286,565 -- -- 3,385,769,863,964 Total
Aset dalam Pelaksanaan Assets in Progress
Gedung, Pabrik, dan Building, Plant
Peralatan Proyek 735,148,352,168 449,872,528,441 -- -- 1,185,020,880,609 Project Equipments
Akumulasi Penyusutan Accumulated Depreciation
Gedung 68,455,565,556 11,648,715,600 -- -- 80,104,281,156 Building
Pabrik 2,183,201,464 2,934,291,110 -- -- 5,117,492,574 Plant
Perlengkapan Kantor 21,065,183,152 4,895,399,237 -- -- 25,960,582,389 Office Supplies
Peralatan Proyek 484,483,040,175 159,753,765,051 -- -- 644,236,805,226 Project Equipments
Kendaraan 10,947,751,252 2,820,489,423 -- -- 13,768,240,675 Vehicles
Jumlah 587,134,741,599 182,052,660,421 -- -- 769,187,402,020 Total
Nilai Buku 3,275,335,187,968 3,801,603,342,554 Book Value

31 Desember 2016/ December 31, 2016


Saldo Awal/ Penambahan/ Pengurangan/ Hapus buku/ Saldo Akhir/
Beginning Balance Addition Deduction Written Off Ending Balance
Rp Rp Rp Rp Rp

Biaya Perolehan Acquisition Cost


Tanah 536.520.330.000 431.392.690.311 -- -- 967.913.020.311 Land
Gedung 190.578.174.470 126.235.887.661 -- -- 316.814.062.131 Building
Pabrik 28.557.974.359 326.223.348.378 -- -- 354.781.322.737 Plant
Perlengkapan Kantor 25.502.014.103 7.891.754.182 -- -- 33.393.768.285 Office Supplies
Peralatan Proyek 837.927.095.896 589.429.425.471 -- -- 1.427.356.521.367 Project Equipments
Kendaraan 13.977.146.066 13.085.736.502 -- -- 27.062.882.568 Vehicles
Jumlah 1.633.062.734.894 1.494.258.842.505 -- -- 3.127.321.577.399 Total
Aset dalam Pelaksanaan Assets in Progress
Gedung, Pabrik, dan Building, Plant
Peralatan Proyek 679.292.961.039 78.827.895.750 22.584.695.070 387.809.551 735.148.352.168 and Project Equipment
Akumulasi Penyusutan Accumulated Depreciation
Gedung 57.119.874.473 11.335.691.083 -- -- 68.455.565.556 Building
Pabrik 794.309.906 1.388.891.558 -- -- 2.183.201.464 Plant
Perlengkapan Kantor 16.193.709.851 4.871.473.301 -- -- 21.065.183.152 Office Supplies
Peralatan Proyek 306.066.347.737 178.416.692.438 -- -- 484.483.040.175 Project Equipments
Kendaraan 9.037.458.512 1.910.292.740 -- -- 10.947.751.252 Vehicles
Jumlah 389.211.700.479 197.923.041.120 -- -- 587.134.741.599 Total
Nilai Buku 1.923.143.995.454 3.275.335.187.968 Book Value

79
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Aset tetap, berupa tanah, pabrik, kendaraan dan Certain land, plants, vehicles and buildings asset
gedung dijadikan jaminan atas perolehan kredit dari are used as collateral for bank loans. Some land
bank. Sebagian tanah berikut gedungnya dijadikan and buildings above are used as collaterals to
jaminan kepada PT Bank Negara Indonesia (Persero) PT Bank Negara Indonesia (Persero) Tbk (Note
Tbk (Catatan 20), PT Bank Mandiri (Persero) Tbk 20), PT Bank Mandiri (Persero) Tbk (Note 20),
(Catatan 20), PT Bank Rakyat Indonesia (Persero) Tbk PT Bank Rakyat Indonesia (Persero) Tbk (Note
(Catatan 20) dan Indonesia Eximbank (Catatan 20) 20) and Indonesia Eximbank (Note 20) amounted
masing-masing sebesar Rp 109.135.230.000, to Rp 109,135,230,000, Rp 6,750,000,000,
Rp 6.750.000.000, Rp 16.186.000.000, dan Rp 16,186,000,000, Rp 5,153,000,000,
Rp 5.153.000.000, dengan nilai keseluruhan respectively, with total amount of
Rp 253.698.792.958, dan nilai wajar tanah dan gedung Rp 253,698,792,958, and the fair value of the
yang dijaminkan sebesar Rp 201.353.690.000.000. lands and buildings as collateral amounted to
Rp 201,353,690,000,000.

Sejak tahun 2015, Grup menerapkan metode Since 2015, the Group applied the revaluation
revaluasian untuk aset tetap kelompok tanah dan model of fixed assets classified as land and
bangunan (Catatan 2). Berdasarkan penilaian penilai buildings (Note 2). Based on revaluation of
independen KJPP Asrori & Rekan tanggal 8 Januari independent appraisal KJPP Asrori & Rekan dated
2016 atas aset tersebut, nilai wajar aset tetap tanah dan January 8, 2016 on the assets, the fair value of
bangunan per 31 Desember 2015 adalah sebesar Fixed Assets on Group land and building as of
Rp 669.978.629.997, sehingga terdapat selisih penilaian December 31, 2015 amounted to
aset tetap sebesar Rp 507.371.858.079, dan Grup Rp 669,978,629,997, hence that there is a surplus
mencatat selisih revaluasi aset tetap sebesar revaluation amounted to Rp 507,371,858,079 and
Rp 492.150.702.338 pada ekuitas setelah dikurangi the Group has recorded surplus revaluation in
dengan pajak. Fixed Assets amounted to Rp 492,150,702,338 on
equity after deducting tax.

Gedung, pabrik dan peralatan dalam penyelesaian The building, plant and equipment under
pada 30 Juni 2017 sebesar Rp 1.185.020.880.609 construction as of June 30, 2017 amounted to
terutama terdiri dari pabrik listrik tenaga hydro dalam Rp 1,185,020,880,609 mainly consist of hydro
penyelesaian dari WSE, entitas anak, sebesar electricity power plant in progress belongs to
Rp 25.987.221.346, pabrik beton dalam penyelesaian WSE, a subsidiary, amounted to
sebesar Rp 1.1107.341.630.305 dan peralatan proyek Rp 25,987,221346, precast plant in progress
Perusahaan dan PT WWE masing-masing sebesar amounted to Rp 829,599,590,863 and equipment
Rp 51.487.749.760 dan Rp 204.279.198. in progress of the Company’ project and PT WWE
amounted to Rp 51,487,749,760 and
Rp 204,279,198, respectively.

Gedung, pabrik dan peralatan dalam penyelesaian Building, plant and equipments under construction
pada 31 Desember 2016 sebesar Rp 735.148.352.168 as of December 31, 2016 amounted to
terutama terdiri dari pabrik listrik tenaga hydro dalam Rp 735,148,352,168 mainly consist of hydro
penyelesaian dari WSE, entitas anak, sebesar electricity power plant in progress belongs to
Rp 1.427.346.779, pabrik beton dalam penyelesaian WSE, a subsidiary, amounted to
sebesar Rp 722.792.388.675 dan peralatan proyek Rp 1,427,346,779, precast plant in progress
Perusahaan sebesar Rp 10.928.616.714. amounted to Rp 722,792,388,675 and the
Company’s project equipments amounted to
Rp 10,928,616,714.

Terdapat pengurangan aset tetap dalam penyelesaian There is write off of assets in progress as of
pada 31 Desember 2016 yaitu gudang Ciputat sesuai December 31, 2016 - Ciputat warehouse, based
dengan berita acara penghapusbukuan No. 01/WK/ on minutes of write off meeting No. 01/WK/
TIPAT/2016 tanggal 9 Desember 2016 sebesar TIPAT/2016 dated December 9, 2016 amounted to
Rp 387.809.551. Rp 387,809,551.

Beban penyusutan dialokasikan sebagai berikut: Depreciation expenses are allocated as follows:

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp
Beban Pokok Pendapatan 146,816,849,838 63,502,407,428 Cost of Revenues
Beban Umum dan Administrasi General and Administrative
(Catatan 39) 35,235,810,583 21,750,741,292 Expenses (Note 39)
Jumlah 182,052,660,421 85,253,148,720 Total

80
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Gedung, pabrik, peralatan proyek dan kendaraan untuk Buildings, plant, project equipments and vehicles
seluruh unit bisnis serta kantor pusat telah for all business units and head office were insured
diasuransikan dengan nilai pertanggungan dan risiko in the amount and risk as follows:
sebagai berikut:
Nama Asuradur/ Jenis Aset/ Periode Asuransi/ Nilai Pertanggungan/ Perusahaan/
Insurer Type of Assets Insurance Period The Sum Insured Company
Rp
PT Asuransi Jasindo (Persero) Risiko pemasangan oleh kontraktor/ Contractor Erection All Risk 10 Desember/ December 2014 s.d/ to 10 Desember 2017/ December 2017 3.045.930.766.990 PT Waskita Beton Precast
PT Asuransi Jasindo (Persero) Proteksi atas proyek CCTW/ Protection of CCTW Project 29 Juni/ June 2016 s.d/ to 29 Juni 2019/ June 2019 2.453.265.241.000 PT Waskita Beton Precast
PT Asuransi Ramayana (Ramayana) Bangunan dan Sarana/ Buildings and Housing 25 Desember/ December 2016 s.d/ to 25 Desember 2017/ December 2017 586.753.397.332 PT Waskita Beton Precast
PT Asuransi Ramayana (Ramayana) Bangunan dan Sarana/ Buildings and Housing 25 Desember/ December 2016 s.d/ to 25 Desember 2017/ December 2017 586.753.397.332 PT Waskita Beton Precast
PT Asuransi Jasindo (Persero) Risiko Semua Kontraktor/ Contractor All Risk 18 Januari/ January 2017 s.d/ to 18 January 2018/ January 2018 441.773.000.000 PT Waskita Beton Precast
PT Asuransi Jasindo (Persero) Proteksi atas proyek CCTW/ Protection of CCTW Project 29 September/ September 2015 s.d/ to 29 September 2018/ September 2018 405.391.466.000 PT Waskita Beton Precast
PT MNC Insurance Risiko Industri/ Industrial All Risk 23 Nopember/ November 2016 s.d/ to 23 November 2017/ November 2017 327.565.000.000 PT Waskita Karya Energi
PT Asuransi Jasindo (Persero) Risiko Kontraktor/ Contractor All Risk 18 Januari/ January 2017 s.d/ to 18 January 2018/ January 2018 245.514.000.000 PT Waskita Beton Precast
PT Asuransi Ramayana (Ramayana) Bangunan dan Sarana/ Buildings and Housing 25 Desember/ December 2016 s.d/ to 25 Desember 2017/ December 2017 177.321.209.000 PT Waskita Beton Precast
PT Asuransi Intra Asia Asuransi Risiko Properti/ Property All Risk Insurance 15 Januari/ January 2017 s.d/ to 15 Januari 2018/ January 2018 135.000.000.000 PT Waskita Karya Realty
PT MNC Insurance Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance 23 November 2016/ November 2016 s.d/ to 23 November 2017/ November 2017 117.315.000.000 PT Waskita Karya Energi
PT Asuransi Tri Pakarta Bangunan dan Sarana/ Buildings and Housing 1 Agustus 2016/ August 2016 s.d/ to 1 Agustus 2017/ August 2017 67.429.710.000 PT Waskita Karya
PT Asuransi Tri Pakarta Asuransi Risiko Properti/ Property All Risk Insurance 1 Agustus 2016/ August 2016 s.d/ to 1 Agustus 2017/ August 2017 67.429.710.000 PT Waskita Karya
PT Asuransi Ramayana (Ramayana) Bangunan dan Sarana/ Buildings and Housing 25 Desember 2016/ December 2016 s.d/ to 25 Desember 2017/ December 2017 50.607.319.000 PT Waskita Beton Precast
PT Asuransi Jasindo (Persero) Polis Standar Asuransi Gempa Bumi/ Insurance Standard Earthquake 18 Januari 2017/ January 2017 s.d/ to 18 Januari 2018/ January 2018 48.813.750.000 PT Waskita Beton Precast
PT Asuransi Intra Asia Kerusakan Mesin/ Machinary Breakdown 15 Januari 2017/ January 2017 s.d/ to 15 Januari 2018/ January 2018 20.000.000.000 PT Waskita Karya Realty
PT MNC Insurance Polis Liabilitas Publik/ Public Liability Policy 23 November 2016/ November 2016 s.d/ to 23 November 2017/ November 2017 10.000.000.000 PT Waskita Karya Energi
PT Asuransi Jasindo (Persero) Polis Standar Asuransi Gempa Bumi/ Standard Policy Insurance Earthquake 18 Januari 2017/ January 2017 s.d/ to 18 Januari 2018/ January 2018 9.062.150.200 PT Waskita Beton Precast
PT Asuransi Intra Asia Polis Liabilitas Publik/ Public Liability Policy 15 Januari 2017/ January 2017 s.d/ to 15 Januari 2018/ January 2018 5.000.000.000 PT Waskita Karya Realty
PT Asuransi Himalaya Pelindung Bangunan dan Sarana/ Buildings and Housing 1 Agustus 2016/ August 2016 s.d/ to 1 Agustus 2017/ August 2017 2.452.470.000 PT Waskita Karya
PT Asuransi Himalaya pelindung Bangunan dan Sarana/ Buildings and Housing 1 Agustus 2015/ August 2015 s.d/ to 1 Agustus 2017/ August 2017 2.452.470.000 PT Waskita Karya
PT Aspan General Insurance Bangunan dan Sarana/ Buildings and Housing 1 Agustus 2016/ August 2016 s.d/ to 1 Agustus 2017/ August 2017 2.022.226.500 PT Waskita Karya
PT MNC Insurance Polis Standar Asuransi Gempa Bumi Indonesia/ Indonesian Insurance Standard Earthquake 23 November 2016/ November 2016 s.d/ to 23 November 2017/ November 2017 1.000.000.000 PT Waskita Karya Energi
Jumlah/ Total 8.808.852.283.354

Manajemen berpendapat bahwa nilai pertanggungan Management believes that insurance coverage for
atas aset tetap yang diasuransikan adalah cukup untuk fixed assets which have been insured are
menutup kemungkinan kerugian yang terjadi. adequate to cover the possible losses.

17. GOODWILL 17. GOODWILL

Goodwill diperoleh dari akuisisi saham yang dilakukan Goodwill recorded from the acquisition of shares
oleh WTR, entitas anak, atas PT Cibitung Cimanggis by WTR, a subsidiary of PT Cibitung Cimanggis
Tollways (CCT) pada bulan Juli 2015, PT Trans Jabar Tollways (CCT) in July 2015, PT Trans Jabar Toll
Toll (TJT) pada 30 Nopember 2015 dan inbreng (TJT) on November 30, 2015 and stock transfer
kepemilikan saham atas PT Pejagan Pemalang Tol (inbreng) of PT Pejagan Pemalang Tol Road
Road (PPTR) menjadi penyertaan di PT Waskita MNC (PPTR) become investment on PT Waskita MNC
Trans-Jawa Toll Road (WMTTR) pada 30 Nopember Trans-Jawa Toll Road (WMTTR) as of November
2015, PT Pemalang Batang Tol Road (PBTR) pada 30, 2015, PT Pemalang Batang Tol Road (PBTR)
bulan Pebruari 2016 dan PT Sriwijaya Markmore at February, 2016 and PT Sriwijaya Markmore
Persada (SRIMP) pada bulan Mei 2016. Persada (SRIMP) on May 2016.

Berikut rincian dari goodwill: Following the details of goodwill:

Entitas Pengakuisisi/ Perolehan Saham pada/ Tahun Perolehan/ Nilai Neto/ Net Value
Acquirer Entity Share Acquisition in Year of Acquisition 2017 2016

PT Waskita Toll Road PT MTD CTP Expressway 2017 594,069,237,595 --


PT Waskita Toll Road PT Waskita Bumi Wira 2017 1,806,000,000 --
PT Waskita Toll Road PT Trans Jawa Paspro Jalan Tol 2017 45,307,263,223 --
PT Waskita Toll Road PT Sriwijaya Markmore Persada 2016 58,782,241,692 58,782,241,692
PT Waskita Toll Road PT Pemalang Batang Toll Road 2016 183,723,536,629 183,723,536,629
PT Waskita Toll Road PT Trans Jabar Tol 2015 760,877,275,511 760,877,275,511
PT Waskita Toll Road PT Cimanggis Cibitung Tollways 2015 467,515,258,744 467,515,258,744
PT Waskita Toll Road PT Pejagan Pemalang Tol Road 2015 239,871,084,893 239,871,084,893

Jumlah/ Total 2,351,951,898,287 1,710,769,397,469

81
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Akuisisi CCT CCT Acquisition

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
CCT (90%)
Imbalan yang Dialihkan 552,150,000,000 552,150,000,000 Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and
Teridentifikasi yang Diperoleh 84,634,741,257 85,534,741,257 Liabilities Acquired
Goodwill 467,515,258,743 466,615,258,743 Goodwill

Pada tanggal 13 Juli 2015, WTR dan On July 13, 2015, WTR and PT Bakrie & Brothers
PT Bakrie & Brothers Tbk menandatangani perjanjian Tbk, entered into an agreement to purchase 90%
pembelian 90% kepemilikan CCT dengan harga ownership in CCT amounted to
perolehan sebesar Rp 552.150.000.000. Nilai wajar Rp 552,150,000,000. The fair value of assets
aset yang diperoleh dan kewajiban yang dialihkan pada acquired and liabilities assumed at the acquisition
tanggal akuisisi adalah sebagai berikut: date were as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Kas dan Setara Kas 202,869,015 202,869,015 Cash and Cash Equivalents
Uang Muka dan Biaya Dibayar Dimuka 7,000,000 7,000,000 Advances and Prepayments
Piutang Lain-lain Pihak Berelasi 70,519,462,085 71,519,462,085 Other Receivables - Related Parties
Aset Tetap dalam Konstruksi 53,886,970,322 53,886,970,322 Asset under Construction
Beban Akrual (758,833,655) (758,833,655) Accrued Expenses
Liabilitas Lainnya (875,820,000) (875,820,000) Other Liabilities
Utang Lain-lain Berelasi (28,943,046,371) (28,943,046,371) Other Payables - Related Parties
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 94,038,601,396 95,038,601,396 Net Asset Acquired
Nilai Wajar Aset Kepentingan Fair Value of
Non Pengendali (9,403,860,139) (9,503,860,139) Non Controlling Interest
Goodwill 467,515,258,743 466,615,258,743 Goodwill
Nilai Wajar Imbalan yang Dialihkan 552,150,000,000 552,150,000,000 Fair Value of Consideration

Pada bulan Juni 2016, CCT, entitas anak dari WTR, In June 2016, CCT, a subsidiary of WTR, make
melakukan perubahan atas saldo cadangan modal changes on the balance of paid-up capital reserves
disetor sebesar Rp 1.000.000.000 sehingga Rp 1,000,000,000 so the Company changed
mengkoreksi saldo goodwill WTR sebesar the balance of WTR’s goodwill amount to
Rp 900.000.000 menjadi sebesar Rp 467.515.258.743. Rp 900,000,000 be amount to
Rp 467,515,258,743.

Akuisisi PPTR PPTR Acquisition

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
PPTR (100%)
Imbalan yang Dialihkan 350,000,000,000 350,000,000,000 Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and
Teridentifikasi yang Diperoleh 110,128,915,107 110,128,915,107 Liabilities Acquired
Goodwill 239,871,084,893 239,871,084,893 Goodwill

82
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pada tanggal 4 Juli 2015, WTR dan PT Rekatunggal On July 4, 2015 WTR and PT Rekatunggal Abadi
Abadi menandatangani perjanjian pembelian 99,99% entered into an agreement to purchase 99.99%
kepemilikan PPTR dengan harga perolehan sebesar ownership in PPTR amounted to
Rp 350.000.000.000. Nilai wajar aset yang diperoleh Rp 350,000,000,000. The fair value of assets
dan kewajiban yang dialihkan pada tanggal akuisisi acquired and liabilities assumed at the acquisition
adalah sebagai berikut: date were as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Kas dan Setara Kas 1,934,089,667 1,934,089,667 Cash and Cash Equivalents
Uang Muka dan Biaya Dibayar di Muka 1,481,467,518 1,481,467,518 Advances and Prepaid Expenses
Aset Tak Berwujud - Hak Penguasahaan Jalan Tol 1,273,349,385,524 Intangible Assets - Concession Right Toll Road
1,273,349,385,524
Aset Tetap dalam Konstruksi 5,404,318,896 5,404,318,896 Asset under Construction
Aset Lain-lain 50,000,473,503 50,000,473,503 Other Assets
Utang Usaha (1,008,122,660,856) (1,008,122,660,856) Accounts Payable
Utang Pajak (158,884,796) (158,884,796) Tax Payables
Utang Bunga Pihak Berelasi (6,016,048,680) (6,016,048,680) Interest Loan - Related Parties
Liabilitas Lain-lain (207,743,225,669) (207,743,225,669) Other Liabilities
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 110,128,915,107 110,128,915,107 Net Asset Acquired
Goodwill 239,871,084,893 239,871,084,893 Goodwill
Nilai Wajar Imbalan yang Dialihkan 350,000,000,000 350,000,000,000 Fair Value of Consideration

Akuisisi TJT TJT Acquisition

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
TJT (99.99%)
Imbalan yang Dialihkan 1,021,019,493,576 1,021,019,493,576 Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and
Teridentifikasi yang Diperoleh 260,142,218,064 260,142,218,064 Liabilities Acquired
Goodwill 760,877,275,512 760,877,275,512 Goodwill

Pada tanggal 11 Nopember 2015, WTR bersama On November 11, 2015, WTR and
PT Bukaka Teknik Utama, PT Graha Multitama PT Bukaka Teknik Utama, PT Graha Multitama
Sejahtera dan PT Karya Perkasa Insani Sejahtera and PT Karya Perkasa Insani entered
menandatangani perjanjian pembelian 81,65% into an agreement to purchase 81.65% ownership
kepemilikan TJT dengan harga perolehan sebesar in TJT amounted to Rp 944,514,000,000. The fair
Rp 944.514.000.000. Nilai wajar aset yang diperoleh value of assets acquired and liabilities assumed at
dan kewajiban yang dialihkan pada tanggal akuisisi the acquisition date were as follows:
adalah sebagai berikut:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Kas dan Setara Kas 4,525,513,134 4,525,513,134 Cash and Cash Equivalents
Uang Muka dan Biaya Dibayar di Muka 55,380,122,729 55,380,122,729 Advances and Prepaid Expenses
Aset Tak Berwujud - Intangible Assets -
Hak Penguasahaan Jalan Tol 210,596,774,983 210,596,774,983 Concession Right Toll Road
Aset Tetap dalam Konstruksi 761,525,928,371 761,525,928,371 Asset under Construction
Aset Lain-lain (544,722,104,382) (544,722,104,382) Other Assets
Utang Usaha (168,360,859,675) (168,360,859,675) Accounts Payable
Utang Pajak (40,926,508) (40,926,508) Tax Payables
Liabilitas Lainnya (80,750,000) (80,750,000) Other liabilities
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 318,823,698,652 318,823,698,652 Net Asset Acquired
Nilai Wajar Aset Kepentingan Fair Value of
Non-Pengendali (58,681,480,588) (58,681,480,588) Non-Controlling Interest
Goodwill 760,877,275,512 760,877,275,512 Goodwill
Nilai Wajar Imbalan yang Dialihkan 1,021,019,493,576 1,021,019,493,576 Fair Value of Consideration

83
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Akuisisi PBTR PBTR Acquisition

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
PBTR (60 %)
Imbalan yang Dialihkan 220,000,000,000 220,000,000,000 Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and
Teridentifikasi yang Diperoleh 36,276,463,371 36,276,463,371 Liabilities Acquired
Goodwill 183,723,536,629 183,723,536,629 Goodwill

Pada tanggal 15 Pebruari 2016, WTR dan On February 15, 2016, WTR and
PT Langkah Utama Perkasa, Countryside Investment PT Langkah Utama Perkasa, Countryside
Corporation dan PT Sumber Mitra Jaya, Investment Corporation and PT Sumber Mitra Jaya
menandatangani perjanjian pembelian 60% entered into an agreement to purchase 60%
kepemilikan PBTR dengan harga perolehan sebesar ownership in PBTR amounted to
Rp 220.000.000.000. Nilai wajar aset yang diperoleh Rp 220,000,000,000. The fair value of assets
dan kewajiban yang dialihkan pada tanggal akuisisi acquired and liabilities assumed at the acquisition
adalah sebagai berikut: date were as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Kas dan Setara Kas 44,721,174 44,721,174 Cash and Cash Equivalents
Uang Muka dan Biaya Dibayar di Muka 576,893,132 576,893,132 Advances and Prepayments
Aset Tak Berwujud - Intangible Assets -
Hak Pengusahaan Jalan Tol 59,839,157,979 59,839,157,979 Concession Right Toll Road
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 60,460,772,285 60,460,772,285 Net Asset Acquired
Nilai Wajar Aset Kepentingan Fair Value of
Non-Pengendali (24,184,308,914) (24,184,308,914) Non-Controlling Interest
Goodwill 183,723,536,629 183,723,536,629 Goodwill
Nilai Wajar Imbalan yang Dialihkan 220,000,000,000 220,000,000,000 Fair Value of Consideration

Akuisisi SRIMP SRIMP Acquisition

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
SRIMP (60 %)
Imbalan yang Dialihkan 315,000,000,000 315,000,000,000 Consideration of Transferred Value
Aset dan Liabilitas Bersih Identified Net Assets and
Teridentifikasi yang Diperoleh 256,217,758,308 256,217,758,308 Liabilities Acquired
Goodwill 58,782,241,692 58,782,241,692 Goodwill

84
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pada tanggal 19 Mei 2016, WTR dan PT Persada On May 19, 2016, WTR and PT Persada Tanjung
Tanjung Api-api, menandatangani perjanjian pembelian Api-api entered into an agreement to purchase
60% kepemilikan SRIMP dengan harga perolehan 60% ownership in SRIMP amounted to
sebesar Rp 315.000.000.000. Nilai wajar aset yang Rp 315,000,000,000. The fair value of assets
diperoleh dan kewajiban yang dialihkan pada tanggal acquired and liabilities assumed at the acquisition
akuisisi adalah sebagai berikut: date were as follows:

30 Juni 2017/ 31 Maret 2017/


June 30, 2017 March 31, 2017
Rp Rp
Kas dan Setara Kas 303,517,604,893 303,517,604,893 Cash and Cash Equivalents
Aset Pajak Tangguhan 1,232,557,000 1,232,557,000 Deffered Tax Assets
Proyek dalam Pelaksanaan 135,758,968,659 135,758,968,659 Project on Progress
Aset Tetap 36,876,125 36,876,125 Fixed Assets
Utang Pajak (6,050,791,698) (6,050,791,698) Tax Payables
Liabilitas Lain-lain (7,465,617,800) (7,465,617,800) Other Liabilities
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 427,029,597,179 427,029,597,179 Net Asset Acquired
Nilai Wajar Aset Kepentingan Fair Value of
Non-Pengendali (170,811,838,872) (170,811,838,872) Non-Controlling Interest
Goodwill 58,782,241,693 58,782,241,693 Goodwill
Nilai Wajar Imbalan yang Dialihkan 315,000,000,000 315,000,000,000 Fair Value of Consideration

18. ASET LAIN-LAIN 18. OTHER ASSETS

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Kontrak Sewa Jangka Panjang 51,977,680,223 41,479,463,853 Long-Term Rent Contract
Beban Kontrak Ditangguhkan 177,243,227,753 39,391,831,786 Contract Deferred Charges
Aset Pengampunan Pajak -- -- Tax Amnesty Assets
Perangkat Lunak 10,352,554,012 11,416,139,618 Software
Tanah dan Bangunan 1,700,000,000 1,700,000,000 Lands and Buildings
Uang Jaminan 3,808,647,193 4,164,925,192 Warranty
Aset Tetap Tidak Digunakan Fixed Assets are not Used
Untuk Dijual 185,172,515 185,172,515 for Sale
Jumlah 245,267,281,696 98,337,532,964 Total

Kontrak sewa jangka panjang merupakan biaya sewa Long-term rent contracts represent long-term land
tanah jangka panjang dengan jangka waktu 1 sampai rent with a period of 1 to 5 years.
dengan 5 tahun.

Beban kontrak yang ditangguhkan merupakan beban Contract deferred charges represent deferred
yang ditangguhkan atas proyek-proyek yang sedang expense of the on-going projects, which will be
berjalan, yang akan dibebankan sebagai beban charged as expense when the project contract has
kontrak pada saat proyek tersebut dilaksanakan. executed.

Perangkat lunak merupakan pembayaran dengan Software represents the payment until the sixth
tahap enam atas pembelian ERP MS Dynamics phases for the purchasing of ERP MS Dynamics
AX2012 dan Auto Desk CAD Design dengan nilai AX2012 and Auto Desk CAD Design with the
perolehan pada tanggal 30 Juni 2017 dan acquisition cost as of June 30, 2017 and December
31 Desember 2016 masing-masing sebesar 31, 2016 amounted to Rp 13,510,005,081 and
Rp 13.849.138.878 dan Rp 13.298.900.654 dengan Rp 13,298,900,654, respectively with accumulated
akumulasi amortisasi masing-masing sebesar amortization amounting to Rp 3,808,663,380 and
Rp 3.808.663.380 dan Rp 2.132.119.739. Rp 2,132,119,739, respectively.

85
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Aset lain-lain tanah dan bangunan adalah sebagai Other assets land and building as follows:
berikut:

1. Tanah di Cengkareng yang dibeli oleh 1. Land located in Cengkareng which purchased by
Perusahaan pada tanggal 21 Mei 1991. the Company on May 21, 1991. Then in 1996,
Kemudian ditahun 1996 Perusahaan the Company submitted a letter to the Head of
menyampaikan Surat kepada Kepala Suku Dinas City Planning, West Jakarta regarding the
Tata Kota Jakarta Barat mengenai peruntukkan designation of the land. Then the Company
tanah tersebut. Kemudian Perusahaan received the answer by letter from the Sub
memperoleh jawaban berdasarkan Surat Department of City Planning, West Jakarta District
Pemerintah Kotamadya Jakarta Barat Suku Dinas No. 288/17125 dated July 18, 1996, which stated
Tata Kota No. 288/17125 tanggal 18 Juli 1996, that in accordance with the planning of the
yang menyebutkan sesuai dengan Rencana Kalideres District year 2005, the land is allocated
Bagian Wilayah Kota Kecamatan Kalideres tahun for the Public Green Improvement. Hence the
2005 lokasi tanah tersebut diperuntukan untuk Company can not process the certificated of
Penyempurnaan Hijau Umum (PHU). Sehingga ownership furthermore.
Perusahaan tidak dapat memproses sertifikat
kepemilikan lebih lanjut.

2. Apartemen Sahid berlokasi di Jalan K.H. Mansur 2. Sahid Apartment located in K.H.Mansur Street
Jakarta yang merupakan kompensasi Jakarta which represents the payment
pembayaran piutang retensi dari PT Sahid Inti compensation of retension receivables of
Dinamika pada tanggal 22 Oktober 1997. PT Sahid Inti Dinamika on the date of October 22,
1997.

Apartemen tersebut telah dinilai oleh Penilai Properti Apartment has been appraised by an Independent
Independen Toto Suharto dan Rekan melalui laporan Property Appraiser Toto Suharto and Partners
tanggal 24 Januari 2016 dengan nilai sebesar through a report dated January 24, 2016 with a fair
Rp 4.281.000.000. Penilaian tersebut menggunakan value of Rp 4,281,000,000. The assessment using
cara-cara penilaian yang lazim, serta memperhatikan common methods assessments, and considering all
semua keterangan, faktor-faktor yang terdapat dalam informations, the factors contained in this report
laporan ini dan berdasarkan pada asumsi dan based on assumptions and limiting condition.
syarat-syarat pembatasan yang berlaku.

Perusahaan tidak menggunakan tanah dan The Company does not use the land and the
apartemen tersebut dalam proses produksi ataupun apartment in the process of producing or rent to the
menyewakannya kepada pihak ketiga, sehubungan third parties in line with those assets are not related
aset tersebut tidak terkait dengan kegiatan utama to the main activities of the Company. Management
Perusahaan. Perusahaan berpendapat bahwa believes that the land and the apartment do not meet
apartemen tanah tersebut tidak memenuhi kriteria the criteria to be classified as fixed asset, so that
untuk diklasifikasikan sebagai aset tetap, sehingga those assets are recorded as other assets.
mencatat aset tersebut diatas sebagai aset lain-lain.

86
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

19. ASET TAK BERWUJUD – HAK PENGUSAHAAN 19. INTANGIBLE ASSETS – TOLL ROAD
JALAN TOL CONCESSION RIGHTS

30 Juni 2017 /June 30 , 2017


Saldo Awal/ Penambahan/ Reklasifikasi/ Penyesuaian/ Saldo Akhir/
Beginning Balance Additions Reclasification Adjustment Ending Balance
Rp Rp Rp Rp Rp

Biaya Perolehan Acquisition Cost


Ruas Jalan Tol : Toll Road Section :
Kanci - Pejagan 3,177,219,741,986 -- -- -- 3,177,219,741,986 Kanci - Pejagan
Pejagan - Pemalang 2,216,218,041,782 -- -- -- 2,216,218,041,782 Pejagan - Pemalang
5,393,437,783,768 -- -- -- 5,393,437,783,768
Aset Dalam Penyelesaian Construction in Progress
Ruas Jalan Tol : Toll Road Section :
Kanci - Pejagan 394,209,181,671 172,078,005,096 -- (3,605,942,001) 562,681,244,766 Kanci - Pejagan
Cimanggis - Cibitung 1,014,993,871,691 163,197,029,916 -- -- 1,178,190,901,607 Cimanggis - Cibitung
Pejagan - Pemalang 966,419,003,130 1,066,161,856,520 -- (1,549,787,181) 2,031,031,072,469 Pejagan - Pemalang
Pasuruan - Probolinggo 438,990,667,300 478,799,838,099 -- (151,145,202) 917,639,360,197 Pasuruan - Probolinggo
Ciawi - Sukabumi 1,636,479,638,503 337,579,461,542 -- -- 1,974,059,100,045 Ciawi - Sukabumi
Kayu Agung - Kayu Agung -
Palembang - Betung 1,205,059,985,305 906,297,888,684 -- -- 2,111,357,873,989 Palembang - Betung
Pemalang - Batang 482,790,482,969 754,844,815,836 -- 8,499,075,835 1,246,134,374,640 Pemalang - Batang
Krian-Legundi-Bunder -- 1,678,062,292,745 -- 1,678,062,292,745 Krian-Legundi-Bunder
Cibitung - Cilincing -- 443,721,397,931 -- -- 443,721,397,931 Cibitung - Cilincing
Bekasi - Cawang - Kp Melayu -- 4,539,150,180,603 -- -- 4,539,150,180,603 Bekasi - Cawang - Kp Melayu
6,138,942,830,569 10,539,892,766,972 - 3,192,201,451 16,682,027,798,992

Akumulasi Accumulated
Amortisasi Amortization
Ruas Jalan Tol : Toll Road Section :
Kanci - Pejagan 370,021,754,570 26,042,897,836 -- -- 396,064,652,406 Kanci - Pejagan
Pejagan - Pemalang 8,614,932,709 8,000,976,717 -- -- 16,615,909,426 Pejagan - Pemalang
378,636,687,279 34,043,874,553 -- -- 412,680,561,832
Nilai Tercatat 11,153,743,927,058 21,662,785,020,928 Carrying Value

31 Desember 2016/ December 31 , 2016


Saldo Awal/ Penambahan/ Reklasifikasi/ Saldo Akhir/
Beginning Balance Additions Reclasification Ending Balance
Rp Rp Rp Rp

Biaya Perolehan Acquisition Cost


Hak Konsesi Concession Right
Ruas Jalan Tol : Toll Road Section :
Kanci - Pejagan 3.176.818.241.986 401.500.000 -- 3.177.219.741.986 Kanci - Pejagan
Pejagan - Pemalang -- -- 2.216.218.041.782 2.216.218.041.782 Pejagan - Pemalang
3.176.818.241.986 401.500.000 2.216.218.041.782 5.393.437.783.768
Aset Dalam Penyelesaian Construction in Progress
Ruas Jalan Tol : Toll Road Section :
Kanci - Pejagan -- 394.209.181.671 -- 394.209.181.671 Kanci - Pejagan
Cimanggis - Cibitung 191.396.777.136 823.597.094.555 -- 1.014.993.871.691 Cimanggis - Cibitung
Pejagan - Pemalang 1.648.036.150.527 1.534.600.894.385 (2.216.218.041.782) 966.419.003.130 Pejagan - Pemalang
Pasuruan - Probolinggo 6.672.667.020 432.318.000.280 -- 438.990.667.300 Pasuruan - Probolinggo
Ciawi - Sukabumi 882.822.920.347 753.656.718.156 -- 1.636.479.638.503 Ciawi - Sukabumi
Kayu Agung - Kayu Agung -
Palembang - Betung -- 1.205.059.985.305 -- 1.205.059.985.305 Palembang - Betung
Pemalang - Batang -- 482.790.482.969 -- 482.790.482.969 Pemalang - Batang
2.728.928.515.030 5.626.232.357.321 (2.216.218.041.782) 6.138.942.830.569

Akumulasi Accumulated
Amortisasi Amortization
Ruas Jalan Tol : Toll Road Section :
Kanci - Pejagan 325.414.775.735 44.606.978.835 -- 370.021.754.570 Kanci - Pejagan
Pejagan - Pemalang -- 8.614.932.709 -- 8.614.932.709 Pejagan - Pemalang
325.414.775.735 53.221.911.544 -- 378.636.687.279
Nilai Tercatat 5.580.331.981.281 11.153.743.927.058 Carrying Value

87
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

20. UTANG BANK JANGKA PENDEK 20. SHORT-TERM BANK LOANS

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
Perusahaan/ The Company
PT Bank Negara Indonesia (Persero) Tbk 4,097,651,588,617 1,394,923,950,421
PT Bank Rakyat Indonesia (Persero) Tbk 1,274,002,753,531 1,547,335,448,041
PT Bank Mandiri (Persero) Tbk 1,539,475,248,545 1,261,479,561,965
PT Bank Syariah Mandiri 222,562,500,000 --
Indonesia Eximbank 1,998,286,196,942 1,000,109,723,966
Entitas Anak/ Subsidiary - WBP
PT Bank Rakyat Indonesia (Persero) Tbk 945,632,801,837 698,608,576,290
PT Bank Negara Indonesia (Persero) Tbk 293,000,000,000 597,024,225,547
PT Bank Rakyat Indonesia Syariah 300,000,000,000 300,000,000,000

Entitas Anak/ Subsidiary - WTR


PT Bank Rakyat Indonesia (Persero) Tbk 1,893,713,600 --
PT Bank Negara Indonesia (Persero) Tbk 2,651,643,200 --
Sub Jumlah/ Sub Total 10,675,156,446,272 6,799,481,486,230
Pihak Ketiga/ Third Parties
Perusahaan/ The Company
PT Bank Panin Tbk 1,894,388,461,779 2,097,229,391,891
PT Bank Sumitomo Mitsui Indonesia 950,000,000,000 300,000,000,000
Bank of Tokyo Mitsubishi UFJ, Ltd. 800,000,000,000 800,000,000,000
PT Bank UOB Indonesia 518,645,749,567 484,276,698,208
PT Bank CIMB Niaga, Tbk 199,479,118,131 --
PT Bank DBS Indonesia 250,000,000,000 --
PT Bank Pembangunan Daerah
Jawa Barat dan Banten Tbk 562,691,868,021 729,590,515,075
PT Bank Central Asia Tbk 211,694,041,157 141,122,302,812
PT Bank Maybank Indonesia Tbk 799,810,892,839 399,918,778,730
Entitas Anak/ Subsidiary - WBP
PT BPD Banten 90,000,000,000 --
PT Bank ICBC Indonesia 700,000,000,000 311,427,978,883

Entitas Anak/ Subsidiary - WTR


PT Bank Pembangunan Daerah
Jawa Barat dan Banten Tbk 405,838,400 --
PT Bank Pembangunan Daerah
Jawa Timur 303,892,800 --
PT Bank Pembangunan Daerah
Jawa Tengah 136,912,000 --
PT Bank Bukopin
Kredit Investasi/ Investment Credit 224,913,195,851 --
Kredit IDC/ IDC Credit 1,441,909,256 --
Sub Jumlah/ Sub Total 7,203,911,879,801 5,263,565,665,599
Jumlah/ Total 17,879,068,326,074 12,063,047,151,829

88
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Suku bunga per tahun : Interest rate per annum :

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016

Perusahaan/ The Company


PT Bank Negara Indonesia (Persero) Tbk 9000% 9050%
PT Bank Rakyat Indonesia (Persero) Tbk 9050% 10000%
PT Bank Mandiri (Persero) Tbk 9,18% - 10% 9,18% - 10%
Indonesia Eximbank 8075% 9025%
PT Bank Panin Tbk 8090% 8050%
PT Bank Sumitomo Mitsui Indonesia 7,90% - 8,05% 8050%
Bank of Tokyo Mitsubishi UFJ, Ltd. Ice Libor + minimum 1,1% Ice Libor + minimum 1,1%
PT Bank UOB Indonesia Jibor + 2,5% Jibor + 2,5%
PT Bank Pembangunan Daerah
Jawa Barat dan Banten Tbk 9000% 9000%
PT Bank Rakyat Indonesia (Persero) Tbk
dan PT Bank Central Asia - Kredit Sindikasi/ Syndicated Credit 9070% 9070%
PT Bank Maybank Indonesia Tbk 8065% 8065%

Entitas anak/ Subsidiary - WBP


PT Bank Rakyat Indonesia (Persero) Tbk 10000% 10000%
PT Bank Negara Indonesia (Persero) Tbk 10000% 10000%
PT Bank Rakyat Indonesia Syariah 10000% 10000%
PT Bank ICBC Indonesia 9,75% - 10% 9,75% - 10%

Perusahaan The Company

1. PT Bank Negara Indonesia (Persero) Tbk 1. PT Bank Negara Indonesia (Persero) Tbk

Perusahaan memperoleh fasilitas kredit dari The Company entered into the credit facilities
PT Bank Negara Indonesia (Persero) Tbk sebagai from PT Bank Negara Indonesia (Persero) Tbk
berikut: as follows:

a. Kredit Modal Kerja (KMK) Revolving a. Revolving Working Capital Loan (WCL) of
Rp 200.000.000.000. Rp 200,000,000,000.
b. Kredit Modal Transaksional b. Transactional Capital Loan of
Rp 1.800.000.000.000. Rp 1,800,000,000,000.
c. Kredit Modal Kerja Supply Chain Financing c. Supply Chain Financing (SCF) Working
(SCF) Rp 1.875.000.000.000. Capital Loan of Rp 1,875,000,000,000.
d. Bank Garansi Rp 3.625.000.000.000. d. Bank Guarantee of Rp 3,625,000,000,000.
e. Letter of Credit (L/C) atau SKBDN sebesar e. Letter of Credit (L/C) or SKBDN of
Rp 270.000.000.000. Rp 270,000,000,000.

Berdasarkan surat No. 015/BIN/PK/2017 tanggal According to letter No. 015/BIN/PK/2017 dated
27 Maret 2017, jangka waktu pinjaman sejak March 27, 2017, the term of loan since date
tanggal 27 Maret 2017 dan jatuh tempo 26 Maret March 27, 2017 and will be due on March 26,
2018. Fasilitas pinjaman ini dijamin dan diikat 2018. The loan facilities are secured and
dengan: bounded with:

a. Persediaan yang telah diikat akta fidusia No. 5 a. Inventory which has been tied by fiduciary
tanggal 13 Agustus 1998 dan telah didaftarkan deed No. 5 dated August 13, 1998 and
di Kantor Pendaftaran Fidusia; Sertifikat was registered at the Fiduciary
Jaminan Fidusia No. C2-4831 HT.04.06. Registration Office; the Fiduciary
TH.2001/NTSD tanggal 26 Januari 2001 Certificate No. C2-4831 HT.04.06.TH.
senilai Rp 8.268.049.363. 2001/NTSD dated January 26, 2001
amounted to Rp 8,268,049,363.

89
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

b. Satu bidang tanah SHGB No. 724 tanggal b. A plot of land with land right (SHGB)
29 Maret 1988 sampai dengan 1 Desember No. 724 dated March 29, 1988 until
2027 seluas 2.098m2 terletak di Kelurahan December 1, 2027, an area of 2,098sqm
Cipinang Cempedak, Kecamatan Jatinegara, located at Kelurahan Cipinang Cempedak,
Jakarta Timur, atas nama Perusahaan senilai Kecamatan Jatinegara, East Jakarta on
Rp 1.500.000.000 sesuai dengan SHT behalf of the Company amounted to
No. 397/T/1988, senilai Rp 31.000.000.000 Rp 1,500,000,000 according to SHT
sesuai dengan SHT.II No. 408/2004 No. 397/T/1988, amounted to
(Catatan 16). Senilai Rp 48.320.400.000 Rp 31,000,000,000 according to SHT.II
sesuai dengan SHT III No. 06386/2014 dan No. 408/2004 (Note 16). Amounted to
senilai Rp 11.120.940.000 dimana SHT IV Rp 48,320,400,000 according to SHT III
sedang dalam proses. No. 06386/2014 and Rp 11,120,940,000
while SHT IV still in process.

c. Satu bidang tanah SHGB No. 38, tanggal c. A plot of land with land right (SHGB)
21 April 2003 sampai dengan 20 April 2022, No. 38, April 21, 2003 until April 20, 2022,
seluas 1.332 m2, terletak di Jl. Langko an area of 1,332sqm, located at
Kelurahan Ampenan Selatan, Kecamatan Jl. Langko Kelurahan Ampenan Selatan,
Ampenan, Mataram, Nusa Tenggara Barat, Kecamatan Ampenan, Mataram, West
atas nama Perusahaan Cabang NTB senilai Nusa Tenggara, on behalf of the
Rp 1.332.000.000 sesuai dengan SHT.I No. Company NTB Branch amounted to
687/2007 (Catatan 16) dan senilai Rp 1,332,000,000 according to SHT.I
Rp 1.860.010.000 dimana SHT II sedang No. 687/2007 (Note 16) and amounted
dalam proses. Rp 1,860,010,000 while SHT II still in
process.

d. Satu bidang tanah SHGB No. 2001 tanggal d. A plot of land with land right (SHGB)
1 Juni 2006 sampai dengan tanggal 1 Januari No. 2001 dated June 1, 2006 until on
2026, seluas 5.798m2, terletak di Kelurahan January 1, 2026, an area of 5,798sqm,
Kuta Alam, Banda Aceh, Aceh, atas nama located at Kelurahan Kuta Alam, Banda
Perusahaan senilai Rp 5.191.600.000 sesuai Aceh, Aceh, on behalf of the Company
dengan SHT I No. 323 (Catatan 16) dan amounted to Rp 5,191,600,000 according
senilai Rp 9.779.660.000 sesuai SHT II to SHT I No. 323 (Note 16) and amounted
No. 1375/2015. Rp 9,779,660,000 according to SHT II
No. 1375/2015.

e. Satu bidang tanah SHGB No. 4 tanggal e. A plot of land with land right (SHGB) No. 4
10 Nopember 1998 sampai dengan dated November 10, 1998 until
19 Desember 2028 seluas 2.511m2, terletak di December 19, 2028 an area of 2,511sqm,
Desa/Kelurahan Betung-Tebal, Kecamatan located at Desa/Kelurahan Betung-Tebal,
Lubuk-Begalung, Padang, Sumatera Barat, Kecamatan Lubuk-Begalung, Padang,
atas nama Perusahaan senilai West Sumatera, on behalf of the
Rp 651.430.000 (Catatan 16) dan senilai Company amounted to Rp 651,430,000
Rp 6.321.020.000 dimana SHT II sedang (Note 16) and amounted
dalam proses. Rp 6,321,020,000 while SHT II still in
process.

f. Satu bidang tanah SHGB No. 7 tanggal f. A plot of land with land right (SHGB) No. 7
10 Pebruari 1993 sampai dengan 7 Pebruari dated February 10, 1993 until February 7,
2013 seluas 806m2, terletak di Kelurahan 2013, an area of 806sqm, located at
Belakanolo, Kecamatan Padang Barat, Kelurahan Belakanolo, Kecamatan
Padang, Sumatera Barat, atas nama Padang Barat, Padang, West Sumatera,
Perusahaan senilai Rp 1.270.880.000 sesuai on behalf of the Company amounted to
dengan SHT I No. 3129/2001, senilai Rp 1,270,880,000 according to SHT I
Rp 460.020.000 sesuai dengan SHT II No. 3129/2001, amounted to
No. 1151/2007. SHGB tersebut telah Rp 460,020,000 according to SHT II
diperpanjang sampai dengan 7 Pebruari 2033 No. 1151/2007. The land right (SHGB)
dan senilai Rp 3.474.910.000 sesuai SHT III has been extended until February 7, 2033
No. 1846/2016 (Catatan 16). and amounted to Rp 3,474,910,000
according to SHT III No 1846/2016 (Note
16).

90
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

g. Satu bidang tanah SHGB No. 1518 tanggal g. A plot of land with land right (SHGB)
10 Maret 1998 sampai dengan 19 Juni 2036, No. 1518 dated March 10, 1998 until
seluas 1.004m2, terletak di Desa Sungai Raya, June 19, 2036, an area of 1,004sqm,
Kodya Pontianak, Kalimantan Barat, atas located at Desa Sungai Raya, Pontianak,
nama Perusahaan senilai Rp 464.850.000 West Kalimantan, on behalf of the
sesuai dengan SHT I No. 356/2001, senilai Company amounted to Rp 464,850,000
Rp 747.850.000 sesuai dengan SHT II according to SHT I No. 356/2001,
No. 169/2007 dan senilai Rp 3.595.942.000 amounted to Rp 747,850,000 according to
sesuai dengan SHT III No. 36/2016 SHT II No. 169/2007, and according to
(Catatan 16). SHT III No. 36/2016 (Note 16).

h. Satu bidang tanah SHGB No. 1085 tanggal h. A plot of land with land right (SHGB)
18 Desember 2006 sampai dengan No. 1085 dated December 18, 2006 until
23 Nopember 2026, seluas 1.404m2, terletak November 23, 2026, an area of 1,404sqm,
di Kelurahan Jemur Wonosari, Kecamatan located at Kelurahan Jemur Wonosari,
Wonocolo, Surabaya, Jawa Timur, atas nama Kecamatan Wonocolo, Surabaya, East
Perusahaan senilai Rp 2.665.700.000 sesuai Java, on behalf of the Company amounted
dengan SHT I No. 2952/2007 dan senilai to Rp 2,665,700,000 according to SHT I
Rp 3.595.940.000 sesuai SHT III No. 2952/2007 and amounted
No. 00621/2016 tanggal 28 Januari 2016 Rp 3,595,940,000 according to SHT III
(Catatan 16). No. 00621/016 dated January 28, 2016
(Note 16).

i. Satu bidang tanah SHGB No. 82 tanggal i. A plot of land with land right (SHGB)
20 Oktober 1988 sampai dengan 13 April No. 82 dated October 20, 1988 to April 13,
2028, seluas 2.013m2, terletak di Kelurahan 2028, an area of 2,013sqm, located at
Kalirungkut, Kodya Surabaya, Jawa Timur, Kelurahan Kalirungkut, Kodya Surabaya,
atas nama Perusahaan senilai East Java, on behalf of the Company
Rp 2.027.710.000 sesuai dengan SHT I amounted to Rp 2,027,710,000 according
No. 4772/2001, senilai Rp 2.474.390.000 to SHT I No. 4772/2001, amounted to
sesuai dengan SHT II No. 2948/2007 dan Rp 2,474,390,000 according to SHT II
senilai Rp 10.571.030.000 dimana SHT III No. 2948/2007 and amounted to
sedang dalam proses (Catatan 16). Rp 10.571.030.000 while SHT III still in
process (Note 16).

j. Satu bidang tanah SHGB No. 2 tanggal j. A plot of land with land right (SHGB) No. 2
25 Juni 1997 sampai dengan 25 Juni 2017, dated June 25, 1997 until June 25, 2017,
seluas 1.000m2, terletak di Kelurahan Pasir an area of 1,000sqm, located at
Panjang, Kecamatan Kelapa Lima, Kodya Kelurahan Pasir Panjang, Kecamatan
Kupang, Nusa Tenggara Timur, atas nama Kelapa Lima, Kodya Kupang, East Nusa
Perusahaan senilai Rp 402.860.000 sesuai Tenggara, on behalf of the Company
dengan SHT I No. 390/2001 dan senilai amounted to Rp 402,860,000 according to
Rp 636.540.000 sesuai dengan SHT II SHT I No. 390/2001 and amount to
No. 239/2007 senilai Rp 3.085.070.000 sesuai Rp 636,540,000 according to SHT II
dengan SHT III No. 1387/2015 (Catatan 16). No. 239/2007 amounted to
Rp 3,085,070,000 according to SHT III
No. 1387/2015 (Note 16).

k. Satu bidang tanah SHGB No. 24 tanggal k. A plot of land with land right SHGB No. 24
24 Oktober 1997 sampai dengan 24 Oktober dated October 24, 1997 until October 24,
2017, seluas 595m2, terletak di Kelurahan 2017, an area of 595sqm, located at
Oesapa, Kecamatan Kelapa Lima, Kodya Kelurahan Oesapa, Kecamatan Kelapa
Kupang, Nusa Tenggara Timur, atas nama Lima, Kodya Kupang, East Nusa
Perusahaan senilai Rp 49.260.000 sesuai Tenggara, on behalf of the Company
dengan SHT I No. 374/2001 dan senilai amounted to Rp 49,260,000 according to
Rp 39.740.000 sesuai dengan SHT II SHT I No. 374/2001 and amounted to
No. 240/2007 (Catatan 16). Rp 39,740,000 according to SHT II
No. 240/2007 (Note 16).

91
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

l. Satu bidang tanah SHGB No. 13 tanggal l. A plot of land with land right (SHGB)
22 Juli 1993 sampai dengan 22 Juli 2023, No. 13 dated July 22, 1993 until July 22,
seluas 4.830m2, terletak di Jl. Eltari II 2023, an area of 4,830sqm, located at Jl.
Kecamatan Kupang Tengah, Kupang, Nusa Eltari II, Kecamatan Kupang Tengah,
Tenggara Timur, atas nama Perusahaan Kupang, East Nusa Tenggara, on behalf
senilai Rp 457.590.000 sesuai dengan SHT I of the Company amounted to
No. 375/2001 (Catatan 16). Rp 457,590,000 according to SHT I
No. 375/2001 (Note 16).

m. Satu bidang tanah SHGB No. 14 tanggal m. A plot of land with land right (SHGB)
22 Juli 1993 sampai dengan 22 April 2023, No. 14 dated July 22, 1993 until April 22,
seluas 4.800m2, terletak di Jl. Eltari II 2023, an area of 4,800sqm, located at Jl.
Kecamatan Kupang Tengah, Kupang, Nusa Eltari II, Kecamatan Kupang Tengah,
Tenggara Timur, atas nama Perusahaan Kupang, East Nusa Tenggara, on behalf
senilai Rp 288.000.000 sesuai dengan SHT I of the Company amounted to
No. 375/2001, senilai Rp 602.410.000 sesuai Rp 228,000,000 according to SHT I
dengan SHT II No. 238/2007 dan senilai No. 375/2001, amounted to
Rp 7.828.880.000 dimana SHT III sedang Rp 602,410,000 according to SHT II
dalam proses (Catatan 16). No. 238/2007 and amounted
Rp 7,828,880,000 while SHT III still in
process (Note 16).

n. Satu bidang tanah SHGB No. 24 tanggal n. A plot of land with land right (SHGB)
11 Juni 1993 sampai dengan 25 Mei 2013, No. 24 dated June 11, 1993 until May 25,
seluas 276m2, terletak di Kelurahan Tikala 2013, an area of 276sqm, located at
Ares, Kecamatan Wenang, Kodya Manado, Kelurahan Tikala Ares, Kecamatan
Sulawesi Utara, atas nama Perusahaan senilai Wenang, Manado, North Sulawesi, on
Rp 263.530.000, sesuai dengan SHT I behalf of the Company amounted to
No. 737/2001 dan senilai Rp 121.670.000, Rp 263,530,000 according to SHT I
sesuai dengan SHT II No. 667/2007. SHGB No. 737/2001 and amounted to
tersebut telah diperpanjang sampai dengan Rp 121,670,000 according to SHT II
25 Mei 2033 (Catatan 16). No. 667/2007. The land right (SHGB) has
been extended until May 25, 2033 (Note
16).

o. Satu bidang tanah SHGB No. 1 tanggal o. A plot of land with land right (SHGB) No. 1
7 Januari 1992 sampai dengan 28 Desember dated January 7, 1992 until December 28,
2020, seluas 4.040m2, terletak di Desa 2020, an area of 4,040sqm, located at
Cileunyi Wetan, Kecamatan Cileunyi, Desa Cileunyi Wetan, Kecamatan
Kabupaten Bandung, Jawa Barat, atas nama Cileunyi, Kabupaten Bandung, West Java,
Perusahaan senilai Rp 1.516.520.000, sesuai on behalf of the Company amounted to
dengan SHT I No. 2927/2001, senilai Rp 1,516,520,000 according to SHT I
Rp 994.180.000 sesuai dengan SHT II No. 2927/2001, amounted to
No. 1613/2007 dan senilai Rp 3.182.880.000 Rp 994,180,000 according to SHT II
sesuai dengan SHT III No. 10710/2015. Tanah No. 1613/2007 and amounted to
yang dijaminkan termasuk bangunan dan Rp 3,182,880,000 according to SHT III
segala sesuatu yang berada diatas tanah No. 10710/2015. Land which is pledged
tersebut baik yang telah ada maupun yang as collateral consist of buildings and
akan ada (Catatan 16). related things already exist in the land, or
to will be exist there (Note 16).

p. Satu bidang tanah SHGB No. 30 tanggal p. A plot of land with land right (SHGB)
26 Januari 2007 sampai dengan 26 Januari No. 30 dated January 26, 2007 until
2027, seluas 1.250m2, terletak di Kelurahan January 26, 2027, an area of 1,250sqm,
Sumerta, Kecamatan Denpasar Timur, Bali, located at Kelurahan Sumerta, Kecamatan
atas nama Perusahaan senilai Denpasar Timur, Bali, on behalf of the
Rp 3.404.000.000 sesuai dengan SHT I Company amounted to Rp 3,404,000,000
No. 2012/2007 senilai Rp 18.705.400.000 according to SHT I No. 2012/2007
dimana SHT II sedang dalam proses. Tanah amounted to Rp 18,705,400,000 while
yang dijaminkan termasuk bangunan dan SHT II still in process. Land which is
segala sesuatu yang berada di atas tanah pledged as collateral consist of buildings
tersebut, baik yang telah ada maupun yang and related things already exist in the
akan ada (Catatan 16). land, or to will be exist there (Note 16).

92
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

q. Satu bidang tanah SHGB No. 01 tanggal q. A plot of land with land right (SHGB)
13 Nopember 1987 sampai dengan No. 01 dated November 13, 1987 until
13 Oktober 2027, seluas 1.905m2, terletak di October 13, 2027, an area of 1,905 sqm,
Jl. P. Antasari No. 1/4, Tanjung Baru, Bandar located at Jl. P. Antasari No. 1/4, Tanjung
Lampung atas nama Perusahaan senilai Baru, Bandar Lampung, on behalf of the
Rp 30.000.000 sesuai dengan S. Hip No. 3181 Company amounted to Rp 30,000,000
tanggal 13 September 1989, senilai according to S. Hip No. 3181 dated
Rp 2.222.100.000 sesuai dengan SHT II September 13, 1989, amounted to
No. 01057/2007 dan senilai Rp 3.642.670.000 Rp 2,222,100,000 according to SHT II
sesuai dengan SHT III No. 02119/2016. No. 01057/2007 and amounted to
(Catatan 16). Rp 3,642,670,000 according to SHT III
No. 02119/2016 (Note 16).

r. Kendaraan bermotor yang terdiri dari 1 (satu) r. Vehicles consist of 1 (one) unit VW
unit VW Caravelle 2.0 tahun 2012, yang diikat Caravelle 2.0 year 2012 tied by fiduciary
fidusia sesuai Akta Pemberian Jaminan in accordance to Fiduciary Guarantee
Fidusia Atas Kendaraan No. W.10.00426020. Deed No. W.10.00426020.AH.05.01 dated
AH.05.01 tanggal 26 Pebruari 2012 senilai February 26, 2012 amounted to
Rp 620.000.000 (Catatan 16). Rp 620,000,000 (Note 16).

Pada tanggal 30 Juni 2017, seluruh tagihan kepada On June 30, 2017, all amount due from
pengguna jasa proyek Masjid Baiturrahman Banda customers of project Baiturrahman Mosque of
Aceh, proyek DI Batang Sinamar, proyek Jalan Banda Aceh project, DI Batang Sinamar
Bebas Hambatan Manado – Bitung, proyek project, Manado – Bitung Freeway project,
Pengaman Pantai Tahap 2 Paket 1 (Giant Sea Coastal Protection 2 Project Phase I Giant
Wall), proyek Pembangunan Jalan Tol Krian (Sea Wall project), Krian Legundi Bunder
Legundi Bunder Manyar, proyek Pembangunan Manyar Toll Road Project, Tapin Dam project,
Bendungan Tapin, proyek Rusun Kemayoran D10-2 Kemayoran D10-2 Flat and Simpang Tanjung
dan proyek Pembangunan Jalan Simpang Tanjung – Aruk Road Enlargement project (MYC) were
– Aruk II (MYC) digunakan sebagai jaminan atas used as collateral bank loans of PT Bank
utang bank PT Bank Negara Indonesia (Persero) Negara Indonesia (Persero) Tbk (Note 5).
Tbk (Catatan 5).

Perjanjian ini juga mencakup batasan-batasan yang Under the agreement the Company is not
tidak diperkenankan dilakukan oleh Perusahaan allowed to do certain action without the prior
tanpa persetujuan tertulis terlebih dahulu dari Bank written consent by the Bank such as to change
antara lain melakukan perubahan kegiatan usaha; business activities; sell or transfer the rights or
menjual atau memindahkan hak atau mengalihkan transfer all or part of the property/assets
seluruh atau sebagian kekayaan/aset milik dalam owned in a single transaction or in a
satu transaksi atau dalam beberapa transaksi transaction unless sell or transfer assets
kecuali menjual atau mengalihkan aset kecuali unless that is arm's length; sell or transfer
yang bersifat arm’s length; menjual atau assets in exchange for or replacement of other
mengalihkan aset sebagai ganti atau digantikan assets that are comparable or better type of
aset lainnya yang sebanding atau lebih baik tipe the nature and quality; sell or transfer assets in
sifat dan kualitasnya; menjual atau mengalihkan the context of the reorganization by the
aset dalam rangka pelaksanaan reorganisasi oleh Government of Republic Indonesia through the
Pemerintah Republik Indonesia sepanjang sale of these assets do not have material
penjualan aset tersebut tidak mempunyai akibat effect; done with requirement will be the
material; dilakukan dengan syarat akan menjadi surviving legal entity; make amendments to it
badan hukum yang bertahan (surviving legal entity); may cause due to the material; filed a petition
melakukan perubahan anggaran dasar yang dapat for bankruptcy or suspension of payment
menimbulkan akibat material; mengajukan obligation payable to the relevant authorities.
permohonan pailit atau permohonan penundaan
kewajiban pembayaran utang kepada instansi yang
berwenang.

93
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Perusahaan diwajibkan untuk mempertahankan The Company should maintain the following
rasio keuangan sebagai berikut: current ratio financial ratios: current ratio at least 1 (one),
minimal 1 (satu) kali, debt to equity ratio maksimal 4 debt to equity ratio of a maximum 4 (four) and
(empat) kali dan debt service coverage minimal debt service coverage of at least 100%. The
100%. Pemenuhan pembatasan pinjaman bank fulfillment of bank lending restrictions will be
dilaporkan oleh Perusahaan setiap akhir tahun dan reported by the Company at the end of the
akan dievaluasi oleh Bank. year and will be evaluated by the Bank.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016
saldo pinjaman Perusahaan ke PT Bank Negara the balance of loan to PT Bank Negara
Indonesia (Persero) Tbk masing-masing sebesar Indonesia (Persero) Tbk amounted to
Rp 4.097.651.588.617 dan Rp 1.394.923.950.421. Rp 4,097,651,588,617 and
Rp 1,394,923,950,421, respectively.

2. PT Bank Rakyat Indonesia (Persero) Tbk  2. PT Bank Rakyat Indonesia (Persero) Tbk

Perusahaan memperoleh fasilitas kredit modal kerja  The Company entered into a working capital
konstruksi transaksional sebesar construction loan transaction facilities
Rp 1.800.000.000.000, fasilitas bank garansi amounted to Rp 1,800,000,000,000, bank
sebesar Rp 4.500.000.000.000, fasilitas cash call guarantee facilities amounted to
Rp 500.000.000.000 dan fasilitas bill purchase Rp 4,500,000,000,000, cash call facilities
financing Rp 1.200.000.000.000 sesuai surat amounted to Rp 500,000,000,000 and bill
No. R.II.140-ADK/DKR-2/06/2016 tanggal 15 Juni purchase financing facility amounted to
2016 fasilitas digunakan sampai tanggal 15 Juni Rp 1,200,000,000,000, according to letter
2017. No. R.II.140-ADK/DKR-2/06/2016 dated
June 15, 2016, these facilities can be used
until June 15, 2017.
Fasilitas pinjaman ini dijamin dan diikat dengan  Loan facilities are collateralized and tied with a
sebidang tanah dengan SHGB No. 655 dengan piece of land with land right (SHGB) No. 655
masa berlaku dari tanggal 7 Januari 1992 sampai dated January 7, 1992 until December 28,
dengan 28 Desember 2020 yang telah diikat hak 2020 that have been tied with its guraantee
tanggungan dengan nilai Rp 16.186.000.000. rights amounted to Rp 16,186,000,000.

Perjanjian ini mencakup batasan-batasan yang  Under the agreement the Company is not
tidak diperkenankan dilakukan oleh Perusahaan allowed to do certain action without the prior
tanpa persetujuan tertulis dari Bank antara lain: written consent by the Bank such as: filed for
mengajukan pernyataan kepailitan kepada bankruptcy to the court, leased assets as
pengadilan, menyewakan aset yang dijaminkan collateral to the bank; pay interest on
kepada bank; melakukan pembayaran bunga atas shareholder loans.
pinjaman pemegang saham.

Perusahaan diwajibkan untuk mempertahankan  Under the agreement the Company should
current ratio minimal 1 (satu) kali. Pemenuhan maintain: current ratio at least 1 (one). The
pembatasan pinjaman bank dilaporkan oleh fulfillment of bank lending restrictions will be
Perusahaan setiap akhir tahun dan akan dievaluasi reported by the Company at the end of the
oleh Bank. year and will be evaluated by the Bank.

Seluruh tagihan proyek (piutang usaha) pada 30  All the project invoices (accounts receivables)
Juni 2017 yang dijaminkan atas utang bank as of June 30, 2017 were pledged against
PT Bank Rakyat Indonesia (Persero) Tbk bank loan to PT Bank Rakyat Indonesia
(Catatan 5) adalah tagihan termin atas Proyek (Persero) Tbk (Note 5) are accounts
Gedung Kantor Satker Perangkat Daerah Pemkot receivables from the Pekanbaru Government
Pekanbaru, Pembangunan Rusun Pasar Rumput, Building project, Pasar Rumput Flat Project,
Pembangunan Tol Solo – Ngawi Paket 2 dan Solo – Ngawi Phase 2, and Section 3 and 6 of
Proyek Jalan Tol MKTT (Medan - Kualanamu - MKTT (Medan Kualanamu Tebing Tinggi) Toll
Tebing Tinggi) seksi 3 dan seksi 6. Ways.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016  As of June 30, 2017 and December 31, 2016
saldo pinjaman Perusahaan ke the balance of loan to PT Bank Rakyat
PT Bank Rakyat Indonesia (Persero) Tbk masing- Indonesia (Persero) Tbk amounted to
masing sebesar Rp 1.274.002.753.531 dan Rp 1,274,002,753,531 and
Rp 1.547.335.448.041, termasuk kredit sindikasi Rp 1,547,335,448,041, respectively, included
masing-masing sebesar Rp 186.611.044.125. syndicated credit amounted to
Rp 186,611,044,125, respectively.

94
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

3. PT Bank Mandiri (Persero) Tbk  3. PT Bank Mandiri (Persero) Tbk

Perusahaan memperoleh fasilitas kredit dari The Company entered into the credit facilities
PT Bank Mandiri (Persero) Tbk sebagai berikut: from PT Bank Mandiri (Persero) Tbk as
follows:

Jenis-jenis Fasilitas/ The Facilities Batas/ Limit Jatuh Tempo/ Due date

Rp
Kredit Modal Kerja Transaksional III (catatan/note 27) 4.200.000.000.000 14/04/2019
Fasilitas Kredit (Non Cash Loan ) 3.000.000.000.000 14/11/2017
Fasilitas Supply Chain Financing (SCF) 1.006.000.000.000 14/11/2017
Kredit Modal Kerja Transaksional II 900.000.000.000 14/11/2018
Kredit Modal Kerja Transaksional 765.000.000.000 14/11/2017
L/C / SKBDN (Sub limit dari NCL) 500.000.000.000 14/11/2017
Trust Receipt (Sub limit dari NCL) 115.000.000.000 14/11/2017
Kredit Modal Kerja Rekening Koran 35.000.000.000 14/11/2017

Atas pinjaman tersebut Perusahaan dikenakan The loan bears interest by 9.18% - 10% per
bunga 9,18% - 10% per tahun. Fasilitas pinjaman annum. The loan facilities are collateralized
ini dijamin dan diikat dengan: and tied with:

a. Collateral cash/deposito berjangka di a. Collateral cash/time deposit in PT Bank


PT Bank Mandiri (Persero) Tbk sebesar Mandiri (Persero) Tbk deposits amounted
Rp 8.448.200.000 yang telah diikat gadai to Rp 8,448,200,000 which is tied by
(Catatan 4). pledge (Note 4).
b. 3 (tiga) bidang tanah berikut bangunan kantor b. 3 (three) lots of land and buildings at
cabang Pekanbaru, yang telah diserahkan dan Pekanbaru Branch offices, which have
telah diikat hak tanggungan (HT) dengan nilai been submitted and tied with a guarantee
Rp 14.075.000.000 (Catatan 16). rights amounted to Rp 14,075,000,000
(Note 16).

c. Pada tanggal 30 Juni 2017, seluruh tagihan c. As of June 30, 2017, all amount due from
kepada pengguna jasa atas proyek CIBIS customers of project Development of
Tower, Apartemen Brooklyn Alam Sutera, UNS CIBIS Tower, Brooklyn Alam Sutera
Solo, Sopo Del Office Tower Lifestyle, Apartment, UNS Solo project, Sopo Del
Indocement Citeureup, PLTM Lebak Tundun, Office Tower Lifestyle project, Indocement
Tanki Oil Sangatta EPC, Waduk Gondang, Citeureup project, PLTM Lebak Tundun
Pembangunan Jalan Layang Kapt. Tendean – project, Sangatta Oil Tanki EPC project,
Blok M – Ciledug Paket Adam Malik, Fly Over Waduk Gondang project, Fly Over Kapt.
Pegangsaan, Sabo Dam Merapi (8 buah), Tendean – Blok M – Ciledug Adam Malik
pengembangan proyek perbaikan Suai Airport, Package project, Fly Over Pegangsaan
Proyek Peningkatan Jalan Gunung Seriang – project, Sabo Dam Merapi Kab. Sleman
Long Beluah, jalan Tanjung Selor – Tanjung (8pcs) project, Upgrading of Existing Suai
Palas – Sekatak, Pekerjaan Arsitektur dan ME Airport project, Gunung Seriang – Long
Hotel Meritus Seminyak, Jalan Tol Ngawi Beluah Road project, Tanjung Selor –
Kertosono Paket 1, Pelabuhan Belawan dan Tanjung Palas – Sekatak Road project,
proyek Bendungan Raknamo dijaminkan atas Architecture and Mechanical Electrical
utang bank PT Bank Mandiri (Persero) Tbk. Works of Meritus Hotel Seminyak project,
Ngawi – Kertosono Toll Road Package 1
project Belawan Port project, and
Raknamo Dam project were used as
collateral bank loans of PT Bank Mandiri
(Persero) Tbk.

95
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Perjanjian ini juga mencakup batasan-batasan yang This agreement includes restrictions which the
tidak diperkenankan dilakukan oleh Perusahaan Company is not allowed to do certain action
tanpa persetujuan tertulis terlebih dahulu dari Bank without the prior written consent by the Bank,
antara lain: memindah tangankan barang jaminan; such as: transfer the collateral; bind itself as
mengikat diri sebagai penjamin hutang atau guarantor of the debt or pledge the Company’s
menjaminkan harta kekayaan perusahaan yang assets that have pledged to another party;
telah dijaminkan kepada pihak lain; menjaga rasio maintain the financial ratios of fixed assets to
keuangan aset tetap yang akan diperoleh/dibeli be acquired/ purchased by the Company in the
oleh Perusahaan di kemudian hari, maka akan future, it will be used as collateral for loans in
dijadikan agunan kredit di PT Bank Mandiri PT Bank Mandiri (Persero) Tbk, the Company
(Persero) Tbk, Perusahaan akan memprioritaskan will prioritize PT Bank Mandiri (Persero) Tbk
kepada PT Bank Mandiri (Persero) Tbk dan and its affiliates to be an arranger, underwriter
afiliasinya untuk menjadi arranger, underwriter dan and others in terms of the Company’s
lain-lain dalam hal perusahaan melakukan corporate action in order to internal fund
corporate action dalam rangka fund raising di dalam raising.
negeri.

Perusahaan diwajibkan untuk mempertahankan The Company should maintain the following
rasio keuangan sebagai berikut: current ratio financial ratios: current ratio at least 1 (one)
minimal 1 (satu) kali, debt to equity ratio maksimal 3 time, debt to equity ratio of a maximum 3
(tiga) kali dan debt service coverage minimal 100%. (three) times and debt service coverage of at
Pemenuhan pembatasan pinjaman bank dilaporkan least 100%. The fulfillment of bank lending
oleh Perusahaan setiap akhir tahun dan akan restrictions will be reported by the Company at
dievaluasi oleh Bank. the end of the year and will be evaluated by
the Bank.

Pada tanggal 30 Juni 2017 dan 2016 saldo As of June 30, 2017 and 2016, the balance of
pinjaman Perusahaan kepada PT Bank Mandiri loan to PT Bank Mandiri (Persero) Tbk
(Persero) Tbk masing-masing sebesar amounted to Rp 1,539,475,248,545 and
Rp 1.539.475.248.545 dan Rp 1.261.479.561.965. Rp 1,261,479,561,965, respectively.

4. Lembaga Pembiayaan Ekspor Indonesia 4. Lembaga Pembiayaan Ekspor Indonesia


(Indonesia Eximbank) (Indonesia Eximbank)

Perusahaan memperoleh fasilitas kredit investasi The Company obtained investment credit
pembiayaan pembangunan ruas jalan tol Pejagan – facility for funding construction of Pejagan
Pemalang sebesar Rp 850.000.000.000 sesuai Pemalang Toll Ways amounted to
Akta Perjanjian Kredit Investasi Ekspor No. 50 Rp 850,000,000,000 according to the Export
tanggal 23 Desember 2014, oleh Notaris Dewantari Investment Credit Facility Deed No. 50 dated
Handayani SH, MPA. Fasilitas tersebut akan jatuh December 23, 2014, by Notary Dewantari
tempo pada tanggal 22 Desember 2024. Handayani SH, MPA. The facility will be due
on December 22, 2024.

Perusahaan juga memperoleh fasilitas Kredit Modal The Company obtained an Export Working
Kerja Export (KMKE) sebesar Capital Loan (EWCL) amounted to
Rp 2.000.000.000.000 sesuai dengan Akta Rp 2,000,000,000,000, according to EWCL
Perjanjian KMKE No. 43 oleh Notaris Ashoya Deed No. 43 by Notary Ashoya Ratam, S.H.,
Ratam, S.H., MKn. tanggal 24 Maret 2017. Mkn. dated March 24, 2017. The facility will be
Pinjaman tersebut akan jatuh tempo pada 27 Maret due on March 27, 2018.
2018.

Pada tanggal 30 Juni 2017, seluruh tagihan kepada As of June 30, 2017, all amount due from
pengguna jasa atas proyek Pembangunan Terminal customers of project Development of
Multipurpose di Pelabuhan Kuala Tanjung dan Multipurpose Terminal at Kuala Tanjung Port
Pembangunan Tol Solo – Ngawi Paket 1 project and Ngawi Toll Road Package 1
(Catatan 5) digunakan sebagai jaminan atas utang Project (Note 5) were used as collateral bank
bank Indonesia Eximbank. loans of Indonesia Eximbank.

Perjanjian ini juga mencakup batasan-batasan yang Under the agreement the Company is not
tidak diperkenankan dilakukan oleh Perusahaan allowed to do certain action without the prior
tanpa persetujuan tertulis terlebih dahulu dari Bank written consent by the Bank such as, a
antara lain; melakukan merger, akuisisi yang dapat merger, acquisition can be impact to pay the
menghambat kewajiban pembayaran kredit kepada obligation to the bank; obtaining new loans on
bank; memperoleh pinjaman baru atas proyek yang projects that have been financed by the bank;
telah dibiayai oleh bank; memperluas atau expand or narrow the business that may affect

96
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

mempersempit usaha yang dapat mempengaruhi the repayment of loans; the usage of credit
pengembalian pinjaman; penggunaan fasilitas kredit facilities for purposes other than financing
selain daripada untuk tujuan pembiayaan fasilitas credit facilities purposes; filed the bankruptcy
kredit; mengajukan permohonan kepailitan kepada petition to the court; sell or transfer assets
pengadilan; menjual atau memindahkan aset yang used as collateral; lend money to anyone,
dijadikan jaminan; meminjamkan uang kepada except the result of normal business activities;
siapapun, kecuali akibat kegiatan usaha yang act as a guarantor or pledge assets property
normal; bertindak sebagai penjamin atau to another party.
menjaminkan harta kekayaan kepada pihak lain.

Perusahaan diwajibkan untuk mempertahankan Under the agreement the Company should
debt to equity ratio maksimal 3 (tiga) kali. maintain the debt to equity ratio maximum 3
Pemenuhan pembatasan pinjaman bank dilaporkan (three) times. The fulfillment of bank lending
oleh Perusahaan dan dievaluasi oleh bank setiap restrictions reported by the Company and will
periode. be evaluated by the bank each reporting
period.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016,
saldo pinjaman Perusahaan kepada Indonesia the balance of Company’s loan to Indonesia
Eximbank masing-masing sebesar Eximbank amounted to Rp 1,998,286,196,942
Rp 1.998.286.196.942 dan Rp 1.000.109.723.966. and Rp 1,000,109,723,966, respectively.

5. PT Bank Panin Tbk  5. PT Bank Panin Tbk

Perusahaan memperoleh fasilitas pinjaman money The Company obtained money credit facilities
market sebesar Rp 1.500.000.000.000 dan garansi market Rp 1,500,000,000,000 and bank
bank (switchable) dan fasilitas foreign exchange guarantee (switchable) and foreign exchange
USD 5.000.000 sesuai dengan surat facility amounted to USD 5,000,000 according
No. 228/IBD/EXT/16 tanggal 20 Juni 2016. Fasilitas to letter No. 228/IBD/EXT/16 dated June 20,
dapat digunakan sampai dengan tanggal 24 Mei 2016. This facility can be used until May 24,
2017. 2017.

Perjanjian ini juga mencakup batasan-batasan yang Under the agreement the Company is not
tidak diperkenankan dilakukan oleh Perusahaan allowed to do certain action without the prior
tanpa persetujuan tertulis terlebih dahulu dari Bank written consent Bank, such as, received a loan
antara lain menerima pinjaman atau kredit baru dari or new credit from another bank or a third party
bank lain atau pihak ketiga yang jumlahnya dapat whose numbers can lead to the violation of
menyebabkan dilanggarnya rasio keuangan pada financial ratios on financial covenants; bind
financial covenant; mengikatkan diri sebagai themselves as a loan against the third parties,
pinjaman terhadap pihak ketiga; membuka usaha new businesses opening other than an existing
baru selain dari usaha yang telah ada; business; dissolve or liquidate the Company;
membubarkan atau melikuidasi Perusahaan; change fields / types of business; to apply for
merubah bidang/jenis usahanya; mengajukan bankruptcy or delayed payment of its debts
permohonan untuk dinyatakan pailit atau (surseance van betaling); change the legal
penundaan pembayaran atas utang-utangnya form or legal status of the Company; change
(surseance van betaling); merubah bentuk hukum the Company's articles of association; leasing
atau status hukum Perusahaan; merubah anggaran the Company to a third party; lease / transfer
dasar Perusahaan; menyewakan Perusahaan
the goods used as collateral; transfer the
kepada pihak ketiga; menyewakan/
Company in any form to any third party; issuing
memindahtangankan barang-barang yang
new shares and selling existing shares; to pay
dipergunakan sebagai jaminan;
memindahtangankan Perusahaan dalam bentuk their debts to shareholders and shares or the
apapun kepada pihak ketiga; mengeluarkan saham- shareholder in any form for existing or that will
saham baru dan menjual saham-saham yang telah be arise in the future; a merger or business
ada; membayar hutangnya kepada para pemegang combination that change the composition of
saham dan atau para perseronya dalam bentuk share ownership; allow the shareholders to
apapun juga yang sekarang telah ada maupun yang withdraw the capital that has been deposited,
akan timbul dikemudian hari; melakukan merger pledged or mortgaged of the Company’s
atau penggabungan usaha sehingga merubah shares.
komposisi kepemilikan saham; memperbolehkan
pemegang saham untuk menarik kembali modal
yang telah disetor, menjaminkan atau
menggadaikan saham Perusahaan.

97
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Perusahaan diwajibkan untuk mempertahankan Under the agreement the Company should
rasio keuangan sebagai berikut: debt to equity ratio maintain the following financial ratios: debt to
maksimum 3 kali, debt service coverage ratio lebih equity ratio maximum 3 times, debt service
besar dari 2 kali dan current ratio minimal 1 kali. coverage ratio at least 2 times and current ratio
Pemenuhan pembatasan pinjaman bank dilaporkan at least 1 times. The fulfillment of bank lending
oleh Perusahaan setiap akhir tahun dan akan restrictions will be reported by the Company at
dievaluasi oleh bank. the end of the year and will be evaluated by the
bank.

Pada tanggal 30 Juni 2017, seluruh tagihan As of June 30, 2017, all amount due from
kepada pengguna jasa atas proyek Frontage Costumers of Projects Frontage Surabaya and
Surabaya dan Pembangunan Jalan Tol Ciawi – the Development of Ciawi – Sukabumi Toll
Sukabumi Seksi 2 dijaminkan atas utang bank Road Section 2 were pledged against bank
PT Bank Panin Tbk. loans of PT Bank Panin Tbk.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016,
saldo pinjaman Perusahaan kepada the balance of loan to PT Bank Panin Tbk
PT Bank Panin Tbk masing-masing sebesar amounted to Rp 1,894,388,461,779 and
Rp 1.894.388.461.779 dan Rp 2.097.229.391.891. Rp 2,097,229,391,891, respectively.

6. PT Bank Sumitomo Mitsui Indonesia  6. PT Bank Sumitomo Mitsui Indonesia

Berdasarkan surat No. SMBCI/NS/0447 tanggal Based on the letter No. SMBCI/NS/0447
15 Desember 2016, Perusahaan memperoleh dated December 15, 2016, the Company
fasilitas kredit dari PT Bank Sumitomo Mitsui obtained a credit facility from PT Bank
Indonesia berupa fasilitas cash loan revolving Sumitomo Mitsui Indonesia in the form of
sebesar Rp 950.000.000.000. Fasilitas tersebut cash loan revolving facility of
memiliki jangka waktu satu bulan sejak perjanjian Rp 950.000.000.000. This facility has a term
kredit ditandatangani, dengan suku bunga 8,50% of one month since the agremeent is signed,
per tahun. with interest rate of 8.50% per annum.

Perjanjian ini mencakup batasan – batasan yang  Under the agreement the Company is not
tidak diperkenankan dilakukan oleh perusahaan allowed to do certain action without the prior
tanpa persetujuan tertulis terlebih dahulu dari bank written consent by the bank, such as,
antara lain, memasang atau mengizinkan adanya installing or permitting the presence or
atau dipasangnya hak jaminan atas aset-asetnya; installation of security rights over its assets;
menjual, mengalihkan atau melepaskan aset- sell, transfer or otherwise dispose of its
asetnya dengan ketentuan-ketentuan dimana aset- assets with the provisions in which these
aset tersebut dapat disewakan atau dibeli kembali assets can be leased or bought back by the
oleh Peminjam; menjual, mengalihkan atau Borrower; sell, transfer or dispose of its
melepaskan piutangnya dengan hak regres; receivables with recourse; entered into any
mengadakan pengaturan apapun dimana uang atau arrangement where the money or the benefits
manfaat bank atau rekening lain dapat digunakan of a bank or other account may be used for
untuk pembayaran, dilakukan kompensasi (set-off) payments, made compensation (set-off) or
atau dimungkinkannya penggabungan beberapa the possibility of combining multiple accounts;
rekening; atau mengadakan pengaturan prioritas
or hold priority setting receipts have the same
penerimaan pembayaran yang memiliki dampak
effect, in a state where the arrangement or
yang sama, dalam keadaan dimana pengaturan
transaction is done mainly as a way to add
atau transaksi dilakukan terutama sebagai suatu
debt financing or finance the purchase of
cara untuk menambah utang pembiayaan atau
membiayai pembelian aset. assets.

Pada tanggal 30 Juni 2017, seluruh tagihan As at June 30, 2017, all amount due from
pengguna jasa atas proyek Jalan Hampengan- customers of road project of Hampengan-
Mendawai II (Multi Years), Apartemen Yukata Alam Mendawai II (Multi Years), Apartment Yukata
Sutera, Irigasi DI Batang Alai dan Jalan Bebas Alam Sutera, Irrigation DI Batang Alai and
Hambatan Manado – Bitung (MYC) (Catatan 5) freeway project of Manado - Bitung (MYC)
digunakan sebagai jaminan atas utang bank (Note 5) were used as collateral bank loans of
PT Bank Sumitomo Mitsui Indonesia. PT Bank Sumitomo Mitsui Indonesia.

98
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016,
saldo pinjaman Perusahaan kepada kepada the balance of loan to PT Bank Sumitomo
PT Bank Sumitomo Mitsui Indonesia masing- Mitsui Indonesia amounted to
masing sebesar Rp 950.000.000.000 dan Rp 950,000.000,000 and Rp 300,000,000,000,
Rp 300.000.000.000. respectively.

7. Bank of Tokyo Mitsubishi UFJ, Ltd.  7. Bank of Tokyo Mitsubishi UFJ, Ltd.

Perusahaan memperoleh fasilitas pinjaman tanpa The Company obtained a uncommitted loan
komitmen sebesar Rp 800.000.000.000 dan fasilitas facility amounting to Rp 800,000,000,000 and
pinjaman terhadap tagihan sebesar loan against invoice facility amounting to
Rp 300.000.000.000 sesuai dengan perjanjian Rp 300.000.000.000 according to credit
kredit No. 16-0484/LN tanggal 17 Desember 2016. agreement No. 16-0484/LN dated
Fasilitas tersebut dapat digunakan sampai dengan December 17, 2016. The facility can be used
tanggal 17 Desember 2017. until December 17, 2017.

Perjanjian ini mencakup batasan-batasan yang Under the agreement the Company is not
tidak diperkenankan dilakukan oleh Perusahaan allowed to do certain action without the prior
tanpa persetujuan tertulis terlebih dahulu dari Bank written consent by the Bank, among others:
antara lain tidak mengubah bisnis Perusahaan, do not change the Company's business, the
Perusahaan harus mempertahankan lisensi penting Company must maintain a licensing matters
terkait dengan bisnis Perusahaan (jika ada). Tidak related to the business of the Company (if
melakukan pelepasan aset secara signifikan, tidak any). Do not dispose significant assets, there
terdapat perubahan yang merugikan kondisi are no adverse changes in Company’s
keuangan Perusahaan. Menjaga rata-rata financial condition. Keeping the average
kepemilikan langsung atau tidak langsung oleh ownership directly or indirectly, by the
Pemerintah Indonesia sekurang-kurangnya 51% Government of Indonesia for at least 51%
sepanjang periode. Menyampaikan progress over the period. Delivering monthly progress
pekerjaan bulanan atas proyek yang dibiayai. of work on the project financed. Submit the
Menyerahkan seluruh tagihan yang dikeluarkan bill issued on the project financed. Delivering
atas proyek yang dibiayai. Menyampaikan seluruh the entire case law, arbritase or other
perkara hukum, arbritase atau perkara administrasi administrative matters. Notify the bank for any
lainnya. Memberitahukan bank atas setiap failure or potential failure and convey other
kegagalan atau potensi kegagalan dan information as requested by the bank.
menyampaikan informasi lainnya sesuai dengan
permintaan bank.

Perusahaan diwajibkan untuk mempertahankan Under the agreement the Company should
debt to equity ratio maksimal 3 (tiga) kali, debt maintain a maximum debt equity ratio of 3
service coverage ratio maksimal 1,5 kali dan current (three) times the maximum debt service
ratio maksimal 1 kali. Pemenuhan pembatasan coverage ratio of 1.5 times and 1 time the
pinjaman bank dilaporkan Perusahaan setiap akhir maximum current ratio. Fulfillment restrictions
tahun dan akan dievaluasi oleh bank. on bank lending reported by the Company at
end of the year and will be evaluated by the
bank.

Pada tanggal 30 Juni 2017, seluruh tagihan kepada As of June 30, 2017, all amount due from
pengguna jasa atas proyek Pembangunan Saluran customers of projects development project
Interkoneksi DI. Osaka, proyek Pembangunan Interconnection Channel DI. Osaka,
Mustika Golf Apartment, proyek Realty The Reiz construction project Mustika Golf Apartment,
Condo Medan, proyek Pembangunan Bendung DI the project Condo Realty The Reiz Medan,
Kamijoro Kab. Bantul (MYC), proyek Jalur Ganda Pembangunan Bendung DI Kamijoro Kab.
KA Lintas Selatan Jawa Jombang - Madiun, Bantul (MYC) project, Jalur Ganda KA Lintas
Saluran Induk DI Air Lakitan, proyek Pembangunan Selatan Jawa Jombang - Madiun project,
Infrastruktur Motaain, and Pembangunan Jalan Tol Saluran Induk DI Air Lakitan, Pembangunan
Ciawi - Sukabumi Seksi 1 Paket 3.2 digunakan Infrastruktur Motaain project, and
sebagai jaminan atas utang Bank of Tokyo- Pembangunan Jalan Tol Ciawi - Sukabumi
Mitsubishi UFJ, Ltd. Seksi 1 Paket 3.2 were used as collateral
bank loans of Bank of Tokyo-Mitsubishi UFJ,
Ltd.

99
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016,
saldo pinjaman Perusahaan kepada Bank of Tokyo the balance of loan to Bank of Tokyo
Mitsubishi UFJ, Ltd. masing-masing sebesar Mitsubishi UFJ, Ltd. amounted to
Rp 800.000.000.000. Rp 800,000,000,000, respectively.

8. PT Bank UOB Indonesia  8. PT Bank UOB Indonesia

Perusahaan memperoleh fasilitas KMK sebesar The Company obtained WCL facility
Rp 600.000.000.000 sesuai dengan surat amounted to Rp 600,000,000,000 according
No. 16/CPB/0114 tanggal 20 Juni 2016 dan fasilitas to the letter of credit No. 16/CPB/0114 dated
non-kas Rp 600.000.000.000. Fasilitas tersebut June 20, 2016 and non-cash facility
dapat digunakan sampai dengan tanggal 20 Juni amounted to Rp 600,000,000,000. This facility
2017. can be used until June 20, 2017.
\

Perjanjian ini mencakup batasan-batasan yang Under the agreement the Company is not
tidak diperkenankan dilakukan oleh Perusahaan allowed to do certain action without the prior
tanpa persetujuan tertulis terlebih dahulu dari Bank written consent by the Bank among others:
antara lain: tidak mengubah bisnis Perusahaan. not change the core business of the
Perusahaan harus mempertahankan lisensi penting Company. The Company should maintained
terkait dengan bisnis Perusahaan (jika ada). Tidak important licence regarding with the
melakukan pelepasan aset secara signifikan, tidak Company’s business (if any). Do not release
terdapat perubahan yang merugikan kondisi of significant assets, there is no adverses
keuangan Perusahaan. Menjaga rata-rata changes to the Company’s financial condition.
kepemilikan langsung atau tidak langsung oleh Maintain the average of direct ownership
Pemerintah Indonesia sekurang-kurangnya 51% averages or indirect ownership of
sepanjang periode. Menyampaikan progres Government of Republic of Indonesia at least
pekerjaan bulanan atas proyek yang dibiayai. 51% during the period. To submit the monthly
Menyerahkan seluruh tagihan yang dikeluarkan progress of projects funded. To submit all the
atas proyek yang dibiayai. Menyampaikan seluruh litigation, arbitration or other administrative
perkara hukum, arbitrase atau perkara administrasi suit. To inform bank for every changes of the
lainnya. Memberitahukan bank atas setiap composition of the board of directors and the
perubahan komposisi dewan direksi dan dewan board of commissioners. To inform the bank
komisaris. Memberitahukan bank atas setiap for any failure or potential failure and to inform
kegagalan atau potensi kegagalan dan of other information according to the bank’s
menyampaikan informasi lainnya sesuai dengan request.
permintaan bank.

Pada tanggal 30 Juni 2017, seluruh tagihan kepada As of 30 June, 2017, all amount due from
pengguna jasa atas proyek Pembangunan Sistem customers of projects Sistem Penyediaan
Penyediaan Maloy (SPAM), Pembangunan Mako Maloy (SPAM), Mako Polda Papua Barat,
Polda Papua Barat, Irigasi di COLO Kab. Wonogiri Irigation in COLO Kab. Wonogiri and Karang
dan Saluran Sungai Karang Anyar digunakan Anyar River Canal were used as collateral
sebagai jaminan atas utang bank PT Bank UOB bank loans of PT Bank UOB Indonesia (Note
Indonesia (Catatan 5). 5).

Perusahaan diwajibkan untuk mempertahankan Under the agreement the Company should
debt to equity ratio maksimal 3 (tiga) kali, debt maintain debt to equity ratio maximum 3
service coverage ratio maksimal 1,5 kali dan current (three) times, debt service coverage ratio
ratio maksimal 1 kali. Pemenuhan pembatasan maximum 1.5 times and current ratio
pinjaman bank dilaporkan oleh Perusahaan setiap maximum 1 time. The fulfillment of bank
akhir tahun dan akan dievaluasi oleh bank. lending restriction will be reported by the
Company at the end of the year and will be
evaluated by the bank.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016,
saldo pinjaman Perusahaan kepada the balance of loan to PT Bank UOB
PT Bank UOB Indonesia masing-masing sebesar Indonesia amounted to Rp 518,645,749,567
Rp 518.645.749.567 dan Rp 484.275.698.208. and Rp 484,275,698,208, respectively.

100
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

9. PT Bank Pembangunan Daerah Jawa Barat dan 9. PT Bank Pembangunan Daerah Jawa Barat
Banten Tbk dan Banten Tbk

Perusahaan memperoleh fasilitas Kredit Modal The Company obtained a sub-limit non cash
Kerja (KMK) sub-limit non-kas loan yang dapat loan Working Capital Loan (WCL) facility that
digunakan untuk SKBDN, L/C dan bank garansi can be used for SKBDN, L/C, and bank
sebesar Rp 750.000.000.000 sesuai adendum guarantee amounted to Rp 750,000,000,000
perjanjian kredit No. 35 tanggal 28 Nopember 2016 according to credit agreement addendum
oleh Notaris Indra Meidi, S.H. Fasilitas tersebut No. 35 dated November 28, 2016 by Notary
dapat digunakan sampai dengan 7 Nopember 2017. Indra Meidi, S.H. The facility can be used until
November 7, 2017.

Perjanjian ini juga mencakup batasan-batasan This agreement includes restructions which
yang tidak diperkenankan dilakukan oleh the Company is not allowed to do certain
Perusahaan tanpa persetujuan tertulis terlebih action without the prior written consent by the
dahulu dari bank antara lain: memindah tangankan Bank, such as: transfer the collateral/billing
agunan/tagihan termin; mengubah bentuk objek terms; change the type of the object of credit
agunan kredit; memperoleh fasilitas kredit investasi collateral; obtain an investment credit facility
atau pinjaman lain dari pihak ketiga untuk proyek or other loans from third parties for the same
yang sama kecuali dalam transaksi usaha yang project, except for the normal operation
wajar; mengikatkan diri sebagai penjamin hutang transaction; bind itself as guarantor ofthe debt
atau menjaminkan harta kekayaan perusahaan or mortgage the Company’s financed assets
yang dibiayai kepada pihak lain; penggabungan that financed the property to another party;
dan peleburan dengan pihak ketiga; mengajukan acquisition and merger and merger with third
permohonan dan atau menyuruh pihak lain parties; to apply and or encouraging others to
mengajukan permohonan kepada pengadilan untuk apply to the court to be declared bankrupt or
dinyatakan pailit atau penundaan pembayaran delay payment of the debt, lend money to
hutang, meminjamkan uang kepada siapapun juga, anybody, except result of normal business
kecuali akibat kegiatan usaha yang normal dalam activities in the debtor's business; to give up
usaha debitur; menyerahkan sebagian atau seluruh some or all of the rights and obligations of the
hak dan atau kewajiban atas fasilitas kredit kepada credit facility or to another party.
pihak lain.

Pada tanggal 30 Juni 2017, seluruh tagihan As of June 30, 2017, all amount due from
kepada pengguna jasa atas proyek Pembangunan costumers of project Pembangunan Bagian
Bagian Jalan Tol Ruas Bakauheni – Terbanggi Jalan Tol Ruas Bakauheni – Terbanggi Besar
Besar Paket 2 Sidomulyo – Kotabaru (Kontrak Paket 2 Sidomulyo – Kotabaru (Kontrak Anak
Anak I), proyek peningkatan DI. Dumpil, I), proyek peningkatan DI. Dumpil,
rekonstruksi jalan batu Mundom – Tabuyung – rekonstruksi jalan batu Mundom – Tabuyung
Natal dan proyek Rusun Kemayoran C2-2, – Natal dan proyek Rusun Kemayoran C2-2,
renovasi stadion renang (Aquatic) GBK dan renovasi stadion renang (Aquatic) GBK dan
pembangunan bangunan fasilitas kapal selam pembangunan bangunan fasilitas kapal selam
paket B2 digunakan sebagai jaminan atas utang paket B2 were used as collateral bank loans
bank PT Bank Pembangunan Daerah Jabar dan of PT Bank Pembangunan Daerah Jabar dan
Banten Tbk (Catatan 5). Banten Tbk (Note 5).

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016,
saldo pinjaman Perusahaan kepada PT Bank the balance of loan to PT Bank
Pembangunan Daerah Jabar dan Banten Tbk Pembangunan Daerah Jabar dan Banten Tbk
masing-masing sebesar Rp 562.691.868.021 dan amounted to Rp 562,691,868,021 and
Rp 729.590.515.075. Rp 729,590,515,075, respectively.

10. PT Bank Rakyat Indonesia (Persero) Tbk dan  10. PT Bank Rakyat Indonesia (Persero) Tbk
PT Bank Central Asia Tbk and PT Bank Central Asia Tbk

Perusahaan memperoleh fasilitas kredit sindikasi The Company obtained a syndicated credit
PT Bank Rakyat Indonesia (Persero) Tbk dan facility of PT Bank Rakyat Indonesia
PT Bank Central Asia Tbk sebesar maksimum (Persero) Tbk and PT Bank Central Asia Tbk
Rp 4.402.500.000.000 dengan suku bunga with maximum amount of
Reference Rate + Marjin yaitu 9,7% per tahun Rp 4,402,500,000,000 with interest rates
sesuai surat No. B.101-DIS/SDK/03/2017 tanggal Reference Rate + Margin reflected to 9.7%
22 Maret 2017. Fasilitas tersebut memiliki jangka per annum according to corresponding letter
waktu 4 tahun setelah perjanjian kredit No. B.101-DIS/SDK/03/2017 dated March 22,

101
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

ditandatangani. 2017. The facility has a term of 4 years after


the loan agreement was signed.

Tujuan dari fasilitas kredit sindikasi ini adalah untuk The purpose of the syndicated credit facility is
membiayai kebutuhan modal kerja konstruksi to finance the working capital needs for
pengadaan transmisi 500 kV Sumatera (“Proyek construction procurement of Sumatera 500 kV
Transmisi Sumatera”) yang terdiri dari pengadaan transmission ("Sumatera Transmission
transmisi dengan rute New Aur Duri – Peranap Project") consisting of procurement
(Seksi 1) dan rute Peranap – Perawang (Seksi 2). transmission route New Aur Duri - Peranap
(Section 1) and the Peranap - Perawang
(Section 2).

Setelah berita acara serah terima untuk masing- After handover for each work package
masing paket pekerjaan diserahkan kepada PLN submitted to PLN as the owner of the project,
selaku owner proyek, sumber pelunasan dari the source of repayment of the credit facility
fasilitas kredit ini akan beralih secara langsung will be switched directly to the owner. The
kepada owner. Seluruh tagihan atas pekerjaan dan entire bill for the work and the bill on
tagihan atas klaim asuransi terkait proyek yang insurance claims related to projects financed
dibiayai menjadi jaminan atas fasilitas kredit ini. as collateral for the credit facility.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016,
saldo pinjaman Perusahaan kepada PT Bank the balance of Company’s loan to PT Bank
Central Asia Tbk masing-masing sebesar Central Asia Tbk amounted to
Rp 211.694.041.157 dan Rp 141.122.302.812. Rp 211,694,041,157 dan Rp 141,122,302,812,
respectively.

11. PT Bank Maybank Indonesia Tbk  11. PT Bank Maybank Indonesia Tbk

Berdasarkan Akad No. 13 tanggal 20 Oktober Based on agreement No. 13 dated


2016, Perusahaan memperoleh fasilitas kredit dari October 20, 2016, the Company obtaining
PT Bank Maybank Indonesia berupa Musyarakah credit facility from PT Bank Maybank
sebesar Rp 950.000.000.000 dengan jangka waktu Indonesia in the form of Musharaka
pinjaman sejak 20 Oktober 2016 dan jatuh tempo Rp 950,000,000,000 with maturities of loans
pada 20 Oktober 2017. Dengan suku bunga 8,65% since October 20, 2016 and due on
per tahun. October 20, 2017. With interest rates at
8.65% per annum.

Perjanjian ini mencakup batasan – batasan yang Under the agreement the Company is not
tidak diperkenankan dilakukan oleh perusahaan allowed to do certain action without the prior
tanpa persetujuan tertulis terlebih dahulu dari bank written consent by the bank, such as
antara lain memindahkan hak dan/atau transferring the rights and/or eliminate most
menghapuskan sebagian besar atau seluruh harta or all of the assets of the Customer and/or
kekayaan Nasabah dan/atau penjamin atau guarantor or pledging/mortgaging goods
menjaminkan/mengagunkan barang-barang moving and goods immovable property of the
bergerak maupun barang-barang tidak bergerak Customer and/or the Guarantor in any way
milik Nasabah dan/atau Penjamin dengan cara and also to the person/party anyone (except
bagaimanapun juga dan kepada orang/pihak to sell in order to conduct business nomal
siapapun juga (kecuali menjual dalam rangka properties); filed a petition to be declared
menjalankan sifat usaha yang nomal); mengajukan bankrupt by the Commercial Court or apply
pemohonan untuk dinyatakan pailit oleh delay payment of debts; doing dissolution or
Pengadilan Niaga atau mengajukan permohonan liquidation based on the decision of the
penundaan pembayaran hutang; melakukan General Meeting of Shareholders (except for
pembubaran atau likuidasi berdasarkan keputusan the shareholders of the governments of the
Rapat Umum Pemegang Saham (kecuali Republic of Indonesia).
pemegang saham Pamerintah Republik lndonesia).

Per 30 Juni 2017, seluruh tagihan kepada As of June 30, 2017, all amount due from
pengguna jasa atas proyek Tol Cimanggis – costumers of the toll road project of
Cibitung Seksi I dan Pembangunan Bendungan Cimanggis - Cibitung Section I and the
Way Sekampung (Paket 2) digunakan sebagai development of Dam Way Sekampung
jaminan atas utang PT Bank Maybank Indonesia (Package 2) were used as collateral bank
Tbk. loans of PT Bank Maybank Indonesia Tbk.

102
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016,
saldo pinjaman Perusahaan kepada PT Bank the balance of loan to PT Bank Maybank
Maybank Indonesia Tbk masing-masing sebesar Indonesia Tbk amounted to
Rp 799.810.892.839 dan Rp 399.918.778.730. Rp 799,810,892,839 and Rp
399,918,778,730, respectively.

Entitas Anak – WBP Subsidiary – WBP

1. PT Bank Rakyat Indonesia (Persero) Tbk  1. PT Bank Rakyat Indonesia (Persero) Tbk

Berdasarkan surat No. R-II-127-ADK/DKR- According to the letter No. R-II-127-


2/5/2016 tanggal 30 Mei 2016, WBP memperoleh ADK/DKR-2/5/2016 dated May 30, 2016,
fasilitas kredit dari BRI berupa kredit modal kerja WBP entered into the credit facilities from BRI
konstruksi sebesar Rp 1.000.000.000.000, dengan in the form of construction working capital
jangka waktu pinjaman selama 12 bulan sejak loan Rp 1,000,000,000,000 the term of loan
tanggal 30 Mei 2016 dan jatuh tempo 29 Mei 2017, for 12 months since date of May 30, 2016 and
berdasarkan perjanjian kredit No. 116 tanggal will be due on May 29, 2017, based on loan
30 Mei 2016 dengan suku bunga 10% per tahun. agreement No. 116 dated May 30, 2016 with
an interest rate of 10% per annum (p.a.).

Perjanjian ini mencakup batasan-batasan yang This agreement includes restrictions that are
tidak diperkenankan dilakukan oleh WBP tanpa not allowed to be done by WBP without any
persetujuan tertulis terlebih dahulu dari bank antara prior written consent from the bank, which are
lain mengikatkan diri sebagai penjamin terhadap binds itself as surety against the other party
pihak lain dan/atau menjaminkan kekayaan debitur and/or pledging debtor wealth to other parties,
kepada pihak lain, kecuali yang sudah ada saat ini; except those already existing; filling for
mengajukan permohonan pernyataan pailit kepada bankruptcy declaration to the Commercial
Pengadilan Niaga untuk menyatakan pailit; Court to declare itself insolvent debtor;
menerima pinjaman/pembiayaan baru dari bank receive a loan/new financing from banks or
atau lembaga keuangan lainnya; menyewakan other financial institutions; rent the tangible
asset yang dijaminkan di bank atau lembaga assets in banks or other financial institutions;
keuangan lainnya; melunasi/membayar utang refinance/replay the debt to shareholders/
kepada pemegang saham/utang persero sebelum limited company’s debt before the bank
utang di bank dilunasi terlebih dahulu; dan repaid the debt in advance; taking action
melakukan tindakan merger, akuisisi, go public dan mergers, acquisitions, go public and the sale
penjualan aset debitur. of debtor’s assets.

Fasilitas pinjaman ini dijamin dan diikat dengan: The loan facility is collateralized and bounded
with:

a. Piutang usaha dan omset kontrak proyek, baik a. Trade accounts receivable and turnover
yang telah dan/atau akan dimiliki oleh debitur of project contracts, both of which have
yang dibiayai oleh bank dengan nilai sebesar been and/or will be owned by the
Rp 1.200.000.000.000 akan diikatkan dengan borrower financed by the bank in the
cessie (Catatan 5). amount of Rp 1,200,000,000,000 be tied
with cessie (Note 5).

b. Sepuluh bidang tanah di Desa Gasing, b. Ten plots of land in the Desa Gasing,
Kecamatan Talang Kelapa, Daerah Tingkat II Kecamatan Talang Kelapa District, Level
Banyuasin, Daerah Tingkat I Sumatera II Daerah Banyuasin, South Sumatra
Selatan, yang terdiri dari: Daerah Level I, which consists of:

 Sebidang tanah sertifikat hak milik  A piece of land property right


No. 2796/Gasing, seluas 20.000 m2, certificate No. 2796/Gasing, covering
tercatat atas nama Tuan Haji Djemain. an area of 20,000 sqm, registered in
the name of Mr. Haji Djemain.
 Sebidang tanah sertifikat hak milik  A piece of land property right
No. 2802/Gasing, seluas 20.000 m2, certificate No. 2802/Gasing,
tercatat atas nama Tuan Azhar Rumawie. measuring 20.000 sqm, registered in
the name of Mr. Azhar Rumawie.
 Sebidang tanah serftifikat hak milik  A piece of land property rights
No. 2803/Gasing, seluas 20.000 m2, serftifikat No. 2803/Gasing, covering
tercatat atas nama Nyonya Hajjah Ponlati. an area of 20,000 sqm, registered in

103
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

the name of Mrs. Hajjah Ponlati


 Sebidang tanah sertifikat hak milik  A piece of land property right
No. 2799/Gasing, seluas 20.000 m2, certificate No. 2799/Gasing, covering
tercatat atas nama Tuan Juanedy. an area of 20,000 sqm, registered in
the name of Mr. Juanedy.
 Sebidang tanah sertifikat hak milik  A piece of land property right
No. 2800/Gasing, seluas 20.000 m2, certificate No. 2800/Gasing, covering
tercatat atas nama Tuan A Makawi. an area of 20,000 sqm, registered in
the name of Mr. A Makawi.
 Sebidang tanah sertifikat hak milik  A piece of land property right
No. 2801/Gasing, seluas 20.000 m2, certificate No. 2801/Gasing, covering
tercatat atas nama Tuan M. Thamrin. an area of 20,000 sqm, registered in
the name of Mr. M. Thamrin.
 Sebidang tanah sertifikat hak milik  A piece of land property right
No. 2805/Gasing, seluas 20.000 m2, certificate No. 2805/Gasing, covering
tercatat atas nama Tuan Ilyas. an area of 20,000 sqm, registered in
the name of Mr. Ilyas
 Sebidang tanah sertifikat hak milik  A piece of land property right
No. 2804/Gasing, seluas 20.000 m2, certificate No. 2804/Gasing, covering
tercatat atas nama Nyonya Magdalena. an area of 20,000 sqm, registered in
the name of Mrs. Magdalena.
 Sebidang tanah sertifikat hak milik  A piece of land property right
No. 2798/Gasing, seluas 20.000 m2, tercatat certificate No. 2798/Gasing, covering
atas nama Tuan Abdullah Beni. an area of 20,000 sqm, registered in
the name of Mr. Abdullah Beni.
 Sebidang tanah sertifikat hak milik  A piece of land property right
No. 2797/Gasing, seluas 20.000 m2, tercatat certificate No. 2797/Gasing, covering
atas nama Nyonya Berta Mai Sundari. an area of 20,000 sqm, registered in
the name of Mrs. Berta Mai Sundari.

Pembatasan terhadap tindakan: Restriction of convenant:

1. Mengikatkan diri sebagai penjamin terhadap 1. Binds itself as surety against the other
pihak lain dan/atau menjaminkan kekayaan party and / or pledging Debtor wealth to
debitur kepada pihak lain, kecuali yang sudah other parties, except those already
ada saat ini. existing.
2. Mengajukan permohonan pernyataan pailit 2. Filing for bankruptcy declaration to the
kepada Pengadilan Niaga untuk menyatakan Commercial Court to declare itself
pailit debitur sendiri. insolvent debtor.
3. Menyewakan aset yang dijaminkan di bank 3. Rent the tangible assets in banks or other
atau lembaga keuangan lainnya. financial institutions.
4. Melunasi / membayar utang kepada pemegang 4. Refinance / repay the debt to
saham / utang persero sebelum utang di bank shareholders / limited company's debt
dilunasi terlebih dahulu. before the bank repaid the debt in
advance.
5. Melakukan tindakan merger, akuisisi, go publik 5. Taking action mergers, acquisitions, going
dan penjualan aset debitur. public and the sale of debtor’s assets.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016  As of June 30, 2017 and December 31, 2016,
saldo pinjaman WBP kepada PT Bank Rakyat the balance of loan of WBP to PT Bank Rakyat
Indonesia (Persero) Tbk masing-masing sebesar Indonesia (Persero) Tbk amounted to Rp
Rp 945.632.801.837 dan Rp 698.608.576.290 945,632,801,837 dan Rp 698,608,576,290,
respectively.

2. PT Bank Negara Indonesia (Persero) Tbk  2. PT Bank Negara Indonesia (Persero) Tbk

Berdasarkan surat No. BIN/2.2/094/R tanggal According to the letter No. BIN/2.2/094/R
10 Juni 2015, Perusahaan memperoleh fasilitas dated June 10, 2015, the Company entered
kredit dari PT Bank Negara Indonesia (Persero) Tbk into the credit facilities from PT Bank Negara
sebagai berikut: Indonesia (Persero) Tbk as follows:

 Kredit modal kerja revolving Rp 50.000.000.000,  Revolving working capital loan of


jangka waktu pinjaman selama 12 bulan sejak Rp 50,000,000,000, the term of loan for 12

104
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

tanggal 23 Juni 2015 dan jatuh tempo 23 Juni months since date of June 23, 2015 and
2016. Kredit modal kerja revolving tersebut telah will be due on June 23, 2016. Revolving
diaktanotariskan berdasarkan perjanjian kredit working capital loan has been notarial deed
No. 150 tanggal 23 Juni 2015. based on loan agreement No. 150 dated
June 23, 2015.
 Kredit modal transaksional Rp 300.000.000.000,  Transactional working capital loan of
jangka waktu pinjaman selama 12 bulan sejak Rp 300,000,000,000, the term of loan for
tanggal 23 Juni 2015 dan jatuh tempo 23 Juni 12 months since date of June 23, 2015 and
2016. Kredit modal transaksional tersebut telah will be due on June 23, 2016. Transactional
diaktanotariskan berdasarkan perjanjian kredit working capital loan has been notarial deed
No. 151 tanggal 23 Juni 2015. based on loan agreement No. 151 dated
June 23, 2015.
 Kredit modal kerja supply chain financing (SCF),  Working capital supply chain financing
bank garansi dan letter of credit (L/C) atau SKBDN (SCF), bank guarantee and letter of credit
Rp300.000.000.000, jangka waktu pinjaman (L/C) or SKBDN, working capital loan of
selama 12 bulan sejak tanggal 23 Juni 2015 dan Rp 300,000,000,000, the term of loan for
jatuh tempo 23 Juni 2016. Kredit modal kerja SCF 12 months since date of June 23, 2015 and
tersebut telah diaktanotariskan berdasarkan will be due on June 23, 2016. SCF has
perjanjian kredit No. 152 tanggal 23 Juni 2015. been notarial deed based on loan
agreement No. 152 dated June 23, 2015.

 Ketiga fasilitas diatas telah diperpanjang  All those three loan facilities have been
berdasarkan surat persetujuan perpanjangan extended based on approval letter of loan
fasilitas kredit No. BIN/2.2/154/R tanggal 20 Juni extension No. BIN/2.2/154/R dated on
2016, dengan jangka waktu selama 12 bulan June 20, 2016, with the term of loan for
sampai dengan 22 Juni 2017. 12 months until June 22, 2017.
Fasilitas pinjaman ini dijamin dan diikat dengan: The loan facilities are collateral and bounded
with:

 Satu bidang tanah dan bangunan seluas  A plot of land and building, an area of
40.196m2, terletak di Desa Kedungwonokerto, 40,196 sqm, located at Desa
Kecamatan Prambon, Kabupaten Sidoarjo, Jawa Kedungwonokerto, Kecamatan Prambon,
Timur, atas nama WSBP senilai Kabupaten Sidoarjo, West Java under the
Rp 66.038.444.437 sesuai dengan Laporan name of WSBP amounted to
Konsultan KJPP Piesta No. 074/SF/FS. Rp 66,038,444,437 according to Consultant
PDC.KSI/II/2015 tanggal 24 Pebruari 2015 KJPP Piesta Report No. 074/SF/FS.PDC.
(Catatan 16) akan diikat Hak Tanggungan (HT). KSI/II/2015 date February 24, 2015
(Note 16) will be tied by Guarantee Right.

 Satu bidang tanah dan bangunan dengan  A plot of land and building with land use
Sertifikat hak guna bangunan (SHGB) No. 38 rights (SHGB) No. 38 dated January 22,
berlaku sejak tanggal 22 Januari 2015 dan akan 2015 and the right will be expired on
berakhir pada tanggal 16 Januari 2045, dengan January 16, 2045, an area of 70,099 sqm,
luas 70.099m2, terletak di Desa Cibatu, located at Desa Cibatu, Kecamatan Cibatu,
Kecamatan Cibatu, Kabupaten Purwakarta, Kabupaten Purwakarta, West Java, under
Jawa Barat, atas nama WBP (dahulu atas nama the name of WBP (formerly under the
Perusahaan) senilai Rp 88.340.004.000 name of the Company) amounted to
(Catatan 16) sudah diikat HT. Rp 88,340,004,000 (Note 16) has been tied
by Guarantee Right.
 Satu bidang tanah dan bangunan dengan SHGB  A plot of land and building with land use
No. 02/Kalijaya berlaku sejak tanggal rights (SHGB) No. 02/Kalijaya dated
16 Pebruari 1988 dan akan berakhir pada February 16, 1988 and the right will be
tanggal 16 Pebruari 2018, dengan luas expired on February 16, 2018, an area of
16.620m2, terletak di Jl. Imam Bonjol No. 52, 16,620 sqm, located at Jl. Imam Bonjol
Desa Kalijaya, Kecamatan Cikarang, Kabupaten No. 52, Desa Kalijaya, Kecamatan
Bekasi, Jawa Barat, atas nama Perusahaan Cikarang, Kabupaten Bekasi, West Java,
senilai Rp 58.218.498.201 (Catatan 16) sudah under the name of the Company amounted
diikat HT. to Rp 58,218,498,201 (Note 16) has been
tied by Guarantee Right.
 Peralatan/mesin/alat berat di Plant Karawang,  Equipment/machine/heavy equipment at
Desa Klari, Kabupaten Karawang, Jawa Barat, Karawang Plant, Desa Klari, Kabupaten
sebesar Rp 299.866.478.836 sesuai Laporan Karawang, West Java amounted to

105
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Konsultan KJPP Piesta No. 074/SF/FS. Rp 299,866,478,836 according to


PDC.KSI/II/2015 tanggal 24 Pebruari 2015 Consultant KJPP Piesta Report
(Catatan 16) yang akan diikat secara fidusia. No. 074/SF/FS. PDC.KSI/II/2015 dated
February 24, 2015 (Note 16) will be tied by
fiduciary.
 Peralatan/mesin/alat berat di Plant Sidoarjo,  Equipment/machine/heavy equipment at
Desa Kedungwonokerto, Jawa Timur, sebesar Sidoarjo Plant, Desa Kedungwonokerto,
Rp 175.490.704.294 sesuai Laporan Konsultan East Java amounted to
KJPP Piesta No. 074/SF/FS.PDC.KSI/II/2015 Rp 175,490,704,294 according to
tanggal 24 Pebruari 2015 yang akan diikat Consultan KJPP Piesta Report
secara fidusia. No. 074/SF/FS. PDC.KSI/II/2015 dated
February 24, 2015 will be tied by fiduciary.

 Piutang usaha WBP pada tanggal 30 Juni 2017  Trade accounts receivable of WBP as of
sebesar Rp 240.461.410.753 yang akan diikat June 30, 2017 amounted to
secara fidusia. Rp 240,461,410,753 will be tied by
fiduciary.

Pembatasan terhadap tindakan: Restriction of convenant:

1. Melakukan perubahan kegiatan usaha 1. Change the business activities as stated in


sebagaimana tercantum dalam anggaran dasar the article of association that can reduce the
yang dapat mengurangi kemampuan melunasi ability to pay off the credit facility.
fasilitas kredit.

2. Menjual atau memindahkan hak atau 2. Sell or transfer all of assets of the company
mengalihkan seluruh atau sebagian kekayaan/ in a single transaction or in multiple
aset dalam satu transaksi atau dalam beberapa transaction, except:
transaksi kecuali:

 Menjual atau mengalihkan aset dengan  Selling or transferring assets with the
ketentuan yang bersifat arm’s length dan provisions that are arm’s length for the
dalam rangka menjalankan usaha sehari- purpose to perform business activities.
hari.
 Menjual atau dengan cara lain mengalihkan  Selling or transferring assets as a
aset sebagai ganti atau digantikan aset replace or to be replaced with another
lainnya yang sebanding atau lebih baik tipe, comparable assets or better in type,
sifat dan kualitasnya. nature, and quality.
 Menjual atau mengalihkan aset dalam  Selling or transferring assets for the
rangka pelaksanaan reorgarnisasi oleh purpose of government reorganization
Pemerintah Republik Indonesia sepanjang of Republic Indonesia as long as the
penjualan asset tersebut tidak mempunyai sale of assets did not have a material
akibat material. result
 Menjual atau mengalihkan aset yang sudah  Selling or transferring assets that are
tidak berguna atau tidak dipakai lagi dengan not useful or not used with the
ketentuan yang bersifat arm’s length. requirements of arm’s length.

3. Mengubah usaha yang sekarang dijalankan/ 3. Change the operational of current business
diusahakan yang dapat menimbulkan akibat that may cause material result unless
material, kecuali dipersyaratkan oleh required by applicable law.
perundang-undangan yang berlaku.

4. Melakukan peleburan, penggabungan, 4. Merger, combining, separation, liquidation


pemisahan, pembubaran perseroan maupun or reconstruction of the company except
rekonstruksi (tindakan korporasi), kecuali: the following requirements:

 Reorganisasi yang dapat dilakukan oleh  Reorganization can be done by the


Pemerintah Republik Indonesia sepanjang Government of Republic Indonesia as
tidak memiliki akibat material. long as did not have material result.
 Tindakan korporasi dengan anggota lain   The corporate actions with other
dalam grup dengan ketetentuan bahwa members in the group with the provision
tindakan korporasi tersebut dilakukan. following the requirements.
 Tindakan korporasi yang dipersyaratkan oleh   The Company will be survived as legal
peraturan perundang-undangan yang entity and will have the legal status after
berlaku. the corporate action.

106
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

 Pemisahan dimana perusahaan menjadi   Separation which the company became


pemegang saham mayoritas. the major shareholder.

5. Melakukan perubahan anggaran dasar yang 5. Changes of association that can lead to a
dapat menimbulkan akibat material. material result.
6. Mengajukan permohonan pailit atau 6. Propose file of bankruptcy or
permohonan penundaan kewajiban pembayaran postponement of debt payment to
utang kepada instansi yang berwenang. authorized parties.

7. Memperoleh pinjaman dari bank atau lembaga 7. Obtain loans from other bank or financial
keuangan lain. institution.

Berdasarkan surat dari PT Bank Negara Indonesia Based on the letter from the PT Bank Negara
(Persero) Tbk tanggal 7 Juni 2016 Indonesia (Persero) Tbk dated
No. BIN/2.2/391/R, PT Bank Negara Indonesia June 7, 2016 No. BIN/2.2/391/R, PT Bank
(Persero) Tbk memberikan persetujuan (waiver) Negara Indonesia (Persero) Tbk stated a
atas pembatasan melakukan perubahan anggaran waiver concerning the changes restriction to
dasar yang dapat menimbulkan akibat material the articles of association that can lead to
terkait rencana WBP untuk melakukan proses material result in relation to the WBP’s plan to
penawaran umum perdana saham. conduct an initial public offering of shares.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016,
saldo pinjaman WBP kepada PT Bank Negara the balance of loan of WBP to PT Bank
Indonesia (Persero) Tbk masing-masing sebesar Negara Indonesia (Persero) Tbk amounted to
Rp 293.000.000.000 dan Rp 597.024.225.547. Rp 293,000,000,000 dan
Rp 597,024,225,547, respectively.

3. PT Bank Rakyat Indonesia Syariah  3. PT Bank Rakyat Indonesia Syariah

Berdasarkan surat akad musyarakah dengan Based on the letter of contract with PT Bank
PT Bank Rakyat Indonesia Syariah Rakyat Indonesia Syariah No. 021/MUSY/
No. 021/MUSY/KP/10/2016 tanggal 17 Oktober KP/10/2016 dated October 17, 2016, WBP
2016, WBP memperoleh fasilitas kredit dari obtained a credit facility from PT Bank Rakyat
PT Bank Rakyat Indonesia Syariah berupa kredit Indonesia Syariah form of working capital
modal kerja konstruksi sebesar credit construction of Rp 300,000,000,000,
Rp 300.000.000.000, dengan jangka waktu the loan term for 12 months since date of
pinjaman selama 12 bulan sejak tanggal October 17, 2016 and with maturity date of
17 Oktober 2016 dan jatuh tempo 16 Oktober 2017 October 16, 2017 and interest rate of 10%
dan dengan suku bunga 10% per tahun. p.a.

Fasilitas ini dijaminkan dengan: This loan facility are secured with:

1. Tagihan Perusahaan dan/atau tagihan selain 1. Total bill/receivable to the Company and/or
kepada Perusahaan (dengan persetujuan other than the Company (with approval
PT Bank Rakyat Indonesia Syariah), sebagai from PT Bank Rakyat Indonesia Syariah),
bouwheer atas kontrak-kontrak pekerjaan yang as bouwheer based on contract agreement
menjadi underlying pencairan di PT Bank Rakyat as underlying for drawdown in PT Bank
Indonesia Syariah. Rakyat Indonesia Syariah.

2. Inventory berupa material yang dibeli dengan 2. Material inventory bought under financing
pembiayaan PT Bank Rakyat Indonesia Syariah of from PT Bank Rakyat Indonesia Syariah
melalui skema pra proyek pendanaan. with pre-project financing scheme.

Nilai fidusia atas jaminan berupa tagihan dan Fiduciary value with collateralized bill and
inventory adalah minimal 125% dari plafond inventory are minimum 125% from the plafond
fasilitas (Catatan 5 dan 9). (Notes 5 and 9).

4. PT Bank ICBC Indonesia  4. PT Bank ICBC Indonesia

Berdasarkan Perjanjian Kredit No. 38 tanggal Based on the Credit Agreement No. 38 dated
20 Desember 2016, WBP mendapatkan kredit December 20, 2016, WBP obtained a working
modal kerja dari ICBC dengan jumlah fasilitas capital loan from ICBC with total facility
Rp 400.000.000.000 yang terbagi atas 2 tranche Rp 400.000.000.000 divided over which the 2
dimana tranche A sebesar Rp 200.000.000.000 tranche which tranche A amounting
merupakan committed line dan tranche B sebesar Rp 200,000,000,000 is committed line and
Rp 200.000.000.000 merupakan uncommitted line, tranche B amounting Rp 200,000,000,000 is

107
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

jangka waktu pinjaman 1 tahun sejak uncommitted Line, loan period of one year
penandatanganan perjanjian. Adapun suku bunga from the signing of the agreement. The
dari tranche A sebesar 10% per tahun (floating) interest rate on the tranche A amounting to
dan tranche B sebesar 9,75% per tahun (floating). 10% p.a. (floating) and tranche B of 9.75%
p.a. (floating).
Fasilitas ini diikat dengan agunan berupa: This facility is collateralized with:

1. Piutang usaha WBP yang diikat secara fidusia, 1. Trade accounts receivable WBP bound
berdasarkan Akta Jaminan Fidusia No. 39 under fiduciary, based on Fiduciary
tanggal 20 Desember 2016 (Catatan 5). Security Deed No. 39 dated December 20,
2016 (Note 5).

2. Sisa nilai atau omset kontrak WBP - kontraktor 2. Remaining value or turnover
harus dengan Perusahaan. contract of WBP - contractors should be
with Company.

21. UTANG LEMBAGA KEUANGAN NON-BANK 21. LOAN TO FINANCIAL INSTITUTION NON-BANK

a. Bagian Jangka Pendek a. Short-Term Portion

Perusahaan The Company

 PT Sarana Multi Infrastruktur (Persero) (SMI)  PT Sarana Multi Infrastruktur (Persero)


(SMI)

Perusahaan memperoleh fasilitas KMK sebesar The Company obtained an WCL


Rp 700.000.000.000 dari SMI sesuai dengan amounted to Rp 700,000,000,000 from
Surat No. S-149/SMI/DPI/04015 tanggal SMI according to the Letter
16 April 2015. Fasilitas tersebut memiliki jangka No. S-149/SMI/DPI/04015 dated April
waktu maksimal 3 (tiga) tahun sejak tanggal 16, 2015. The Facility has a maximum
penandatanganan perjanjian pembiayaan. time period of 3 (three) years since the
Tingkat bunga pinjaman sebesar 9,5% dari date of signing of the financing
jumlah fasilitas pembiayaan yang ditarik agreement. The loan interest rate is
dan/atau digunakan dan belum dibayar kembali 9.5% which was calculated from the loan
oleh Perusahaan per tahun. drawdown and/or used and has not been
paid by the Company.

Berdasarkan perjanjian ini, Perusahaan memiliki Based on this agreement, the Company
batasan-batasan yang tidak diperkenankan have restrictions which not allowed to do
untuk dilakukan tanpa persetujuan tertulis certain action without the prior written
terlebih dahulu dari SMI sejak tanggal perjanjian approval by SMI since the date of the
pembiayaan sampai dengan dilunasinya seluruh financing agreement until the settlement
kewajiban yang terhutang, antara lain: of all liabilities, among others:

1. melakukan perubahan kepemilikan atas 1. conduct the changes of shares


saham dan hak konsesi; ownership and rights concessions;
2. menjual, melepaskan atau dengan cara lain 2. sell, release or in any other way
mengalihkan seluruh atau sebagian harta transfer all or part of the assets
kekayaan debitur yang telah dijaminkan; debtors who have pledged;
3. menyerahkan seluruh atau sebagian dari 3. submit all or part of the rights or
hak atau kewajiban debitur yang timbul obligations of the debtor which arised
berdasarkan perjanjian pembiayaan ini based on this financing agreement to
kepada pihak lain; another party;
4. mengadakan perubahan nama, bentuk dan 4. held a change of name, form and
status hukum, serta sifat dan kegiatan legal status, as well as the
usaha debitur seperti yang sedang characteristic and business activities
dilaksanakan saat ini; dan of the debtor as it is being
implemented at this time; and
5. mengajukan permohonan pernyataan pailit 5. apply for a declaration of bankruptcy
kepada Pengadilan Niaga untuk to the Commercial Court to declare
menyatakan pailit diri debitur sendiri themselves bankrupt debtor it self
terhitung sejak tanggal perjanjian since the date of the financing

108
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

pembiayaan sampai dengan dilunasinya agreement signed until


seluruh kewajiban yang terhutang oleh the settlement of all liabilities owned
debitur kepada kreditur. by the debtor to the creditor.

Seluruh tagihan termin pada 30 Juni 2017 yang All term invoices as at June 30, 2017
dijaminkan atas utang SMI yaitu termin atas were pledged against loan to SMI which
proyek Jalan Tol Pejagan Pemalang Seksi I, are Pejagan Pemalang Toll Road
proyek Jalan Tol Pejagan Pemalang Seksi II Section I and Pejagan Pemalang Toll
(Catatan 5). Road Section II (Note 5).

Perusahaan juga memperoleh fasilitas The Company also obtained financing


pembiayaan dana talangan dari SMI maksimum facility bailout of SMI to a maximum of
sebesar Rp 3.703.370.000.000 dengan tarif Rp 3,703,370,000,000 with the Deposit
bunga Lembaga Penjaminan (LPS) + 1,00% per Insurance Agency (LPS) rate interest
tahun sesuai surat No. S-401/SMI/DPI/0616 rate + 1.00% per annum according to the
tanggal 1 Juni 2016 fasilitas tersebut memiliki letter No. S-401 / SMI / DPI / 0616 dated
jangka waktu pembayaran maksimal 1 tahun June 1, 2016 the facility has a maximum
sejak tanggal penandatanganan perjanjian term of payment one year from the date
pembiayaan. of signing of the financing agreement.

Tujuan dari fasilitas ini adalah untuk The purpose of this facility is to finance
pembiayaan dana talangan pembebasan tanah the land acquisition bailout fund for
untuk proyek pembangunan jalan tol yang the construction of toll roads owned
dimiliki baik secara langsung maupun tidak directly or indirectly by the Group,
langsung oleh Grup, diantaranya KKDM, PPTR, including KKDM, PPTR, PBTR, CCT, PT
PBTR, CCT, PT Trans Jawa Paspro Jalan Tol Trans Jawa Paspro Jalan Tol (TJPT),
(TJPT), TJT, SNJ, NKJ, JMKT, CSJ, dan CW. TJT, SNJ, NKJ, JMKT, CSJ, and CW.

Jumlah penggunaan fasilitas pembiayaan ini Amount use of this financing facility up to
sampai dengan tanggal 30 Juni 2017 June 30, 2017 and December 31, 2016
dan 31 Desember 2016 masing-masing amounted to Rp nil and
sebesar Rp nihil dan Rp 3,281,288,365,177, respectively.
Rp 3.281.288.365.177.

 PT Indonesia Infrastructure Finance (IIF)  PT Indonesia Infrastructure Finance (IIF)

Perusahaan memperoleh fasilitas pinjaman The Company obtained a revolving loan


bergulir sebesar Rp 800.000.000.000 dari amounted to Rp 800,000,000,000 from
PT Indonesia Infrastructure Finance (IIF) sesuai PT Indonesia Infrastructure Finance (IIF)
dengan Surat No.S.2016.612/LA/INV/IX.IIF according to the Letter No. S.2016.612/
tanggal 27 September 2016. Fasilitas tersebut LA/INV/IX.IIF dated September 27,
memiliki jangka waktu maksimal 1 (satu) tahun 2016. The Facility has a maximum time
sejak tanggal penandatanganan perjanjian period of 1 (one) year since the date of
pembiayaan. Tingkat bunga pinjaman sebesar signing of the financing agreement. The
8,55% dari jumlah fasilitas pembiayaan yang loan interest rate is 8.55% which was
ditarik dan/atau digunakan dan belum dibayar calculated from the loan drawdown
kembali oleh Perusahaan per tahun. and/or used and has not been paid by
the Company.

Jumlah keseluruhan penggunaan fasilitas Amount use of this financing facility up to


pembiayaan ini sampai dengan tanggal 30 Juni June 30, 2017 and December 31, 2016
2017 dan 31 Desember 2016 masing-masing amounted to Rp 798,850,245,730 and
sebesar Rp 798.850.245.730 dan nihil. nil, respectively.

109
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

b. Bagian Jangka Panjang b. Long-Term Portion

Entitas anak (kepemilikan tidak langsung) – WSE, The subsidiary (indirect ownership) – WSE,
PT Indonesia Infrastructure Finance (IIF) PT Indonesia Infrastructure Finance (IIF)

Pada tanggal 8 March 2016, WSE memperoleh On March 8, 2016, WSE obtained a long-term
fasilitas pinjaman berjangka panjang dari IIF loan facility from IIF amounting to
sejumlah Rp 175.000.000.000 yang terdiri dari Rp 175,000,000,000, which consists of
fasilitas Kredit Investasi (KI) dan Interest During Investment Credit (KI) facility and Interest
Construction (IDC) sebesar Rp 10.400.000.000. During Construction (IDC) facility amounting to
Rp 10,400,000,000.

Pinjaman ini dibayarkan secara cicilan triwulan The loan is paid in quarterly installments until
sampai dengan bulan Maret 2026 dengan masa March 2026 with grace period of 12 months.
tenggang 12 bulan. Fasilitas pinjaman berjangka This long-term loan facility was obtained by the
panjang ini diperoleh WSE untuk pembiayaan proyek WSE to finance the construction of 2X5 MW
pembangunan pembangkit listrik tenaga mini hydro mini-hydro power plant with interest rate per
2X5 MW dengan tingkat bunga per tahun sebesar annum of 12.25%. WSE appoints PT Bank
12,25%. WSE menunjuk PT Bank Negara Indonesia Negara Indonesia (Persero) Tbk as security
(Persero) Tbk sebagai agen jaminan. agent.

Pinjaman tersebut diatas dijamin dengan piutang The loan is collateralized with accounts
usaha, aset keuangan atas proyek konsesi dan aset receivable, financial asset from concession
tetap WSE. project and property, plant and equipment of
WSE.

Perjanjian pinjaman mencakup persyaratan tertentu The loan agreements include certain
yang mengharuskan Perusahaan mempertahankan requirements for the Company to maintain
rasio keuangan tertentu yang dihitung berdasarkan certain financial ratios calculated based on the
laporan keuangan dan persyaratan lainnya. financial statements and other covenants.

Sampai dengan tanggal 30 Juni 2017 dan As of June 30, 2017 and December 31, 2016,
31 Desember 2016, WSE sudah memakai Fasilitas WSE has used Loan Facility amounting to
pinjaman tersebut sebesar Rp 175.000.000.000 yang Rp 175,000,000,000 that divided into KI Facility
terdiri dari Fasilitas KI sebesar Rp 169.154.733.895 amounting to Rp 169,154,733,895 and IDC
dan Fasilitas IDC sebesar Rp 5.845.266.105. Facility amounting to Rp 5,845,266,105,
respectively.

22. UTANG USAHA 22. ACCOUNTS PAYABLE

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pemasok 5,130,538,100,376 1,860,675,272,573 Suppliers
Subkontraktor 2,643,592,798,913 3,395,254,066,541 Subcontractors
Ventura Bersama 2,074,076,669,202 177,101,410,554 Joint Ventures
Sewa Alat 527,749,259,317 365,974,029,747 Rental Equipment
Upah Kerja 80,945,923,955 82,518,625,204 Wages
Lain-lain 673,804,068,042 1,480,171,667,280 Others

Jumlah 11,130,706,819,805 7,361,695,071,899 Total

110
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

23. UTANG BRUTO SUBKONTRAKTOR 23. GROSS AMOUNT DUE TO SUBCONTRACTORS

Utang bruto subkontraktor merupakan utang kerja Gross amount due to subcontractors represents
subkontraktor yang belum diberita acarakan, baik dari payable for uncertified subcontractor’s working
subkontraktor atau material yang diakui sebagai progress, either from subcontractor or materials
prestasi karena belum memenuhi syarat pembayaran which are recognized as progress but it has not
sesuai kontrak. fulfilled the certain payment condition as stated in
the contract.

Rincian utang bruto subkontraktor berdasarkan unit The details of gross amount due to subcontractors
kerja adalah sebagai berikut: based on business unit are as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Perusahaan/ The Company
Divisi/ Division I 2,963,373,413,052 3,380,010,019,129
Divisi/ Division III 1,070,296,858,308 2,027,004,458,386
Divisi/Division II 1,028,579,800,107 --
Divisi/Division V 607,261,692,461 1,253,299,605,619
Divisi/ Division VI 678,819,898,749 --
Divisi/ Division IV 213,066,477,176 122,712,154,006
Divisi/ Division VII 45,162,254,418 --
Sub Jumlah/ Sub Total 6,606,560,394,271 6,783,026,237,140
Entitas Anak/ Subsidiary
PT Waskita Beton Precast Tbk (WBP) 439,287,072,965 508,412,829,088
PT Waskita Sangir Energi (WSE) 327,418,879 --
PT Waskita Karya Realty (WKR) 81,930,127,664 --
Sub Jumlah/ Sub Total 521,544,619,508 508,412,829,088

Jumlah/ Total 7,128,105,013,779 7,291,439,066,228

24. UANG MUKA KONTRAK JANGKA PENDEK 24. ADVANCES ON SHORT-TERM CONTRACT

Uang muka kontrak jangka pendek merupakan uang Advance on Short-Term Contract represents
muka pelaksanaan proyek yang diterima dari pemberi advance received from the owners of projects on
kerja sesuai kontrak pekerjaan konstruksi jangka short-term construction contracts; the advances
pendek; uang muka tersebut akan dikompensasikan will be offset with the progress of work and terms
dengan progress pekerjaan dan termin pembayaran of payment in accordance with the progress of
sesuai dengan progress lapangan. work.

Rincian utang bruto subkontraktor berdasarkan unit The details of gross amount due to subcontractors
kerja adalah sebagai berikut: based on business unit are as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Perusahaan/ The Company
Divisi/ Division I 87,594,045,804 25,405,296,678
Divisi/ Division III 25,661,901,869 186,761,648,657
Divisi/ Division II 47,884,125,230 --
Divisi/ Division V 11,420,751,731 193,757,956,370
Divisi/ Division Precast 16,652,492,500 16,652,492,500
Divisi/ Division VI -- --
Divisi/ Division IV 791,500,000 11,095,618,069
Sub Jumlah/ Sub Total 190,004,817,134 433,673,012,274

Entitas Anak/ Subsidiaries


PT Waskita Karya Realty 15,212,907,986 --
PT Waskita Beton Precast Tbk 54,072,036,225 123,586,962,146
Sub Jumlah/ Sub Total 69,284,944,211 123,586,962,146
Jumlah/ Total 259,289,761,345 557,259,974,420

111
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Uang muka kontrak jangka pendek berdasarkan pihak- Advance received for short term contracts based
pihak pemberi kerja sebagai berikut: on the owner of projects are as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
PT Ngawi Kertosono Jaya 25,661,901,869 93,480,771,225
PT Kereta Api Indonesia (Persero) 46,643,881,794 79,499,528,087
PT Prima Multi Terminal (Pelindo) 24,763,916,271 38,129,041,456
PT Solo Ngawi Jaya -- 47,549,469,054
PT PAL Indonesia (Persero) -- 41,782,700,106
PT Hutama Karya (Persero) -- 22,485,047,559
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 25,863,238,846 12,440,104,423
Sub Jumlah/ Sub Total 122,932,938,780 335,366,661,910
Pihak Ketiga/ Third Parties
PT Royal Abadi Dentalindo 23,197,759,090 --
KSO/ JO CBMI - DDK --
Pemerintah Daerah/ District Governments -- 28,237,810,123
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 113,159,063,475 193,655,502,387

Sub Jumlah/ Sub Total 136,356,822,565 221,893,312,510


Jumlah/ Total 259,289,761,345 557,259,974,420

Uang muka pada WBP, entitas anak, merupakan uang Advances on WBP, a subsidiary, represent
muka yang diterima atas pesanan beton precast dari advances received on beton precast orders from
pelanggan. customers.

25. BIAYA YANG MASIH HARUS DIBAYAR 25. ACCRUED EXPENSES


30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp
Beban Bunga Obligasi 102,031,321,325 70,384,951,680 Bonds Interest Expenses
Beban Umum 83,714,032,978 97,181,046,474 General Expenses
Beban Kantor 63,747,580,708 66,876,092,307 Office Expenses
Beban Pegawai 17,936,558,984 7,291,444,766 Employee Expenses
Beban Operasional Proyek 339,888,404 367,518,106 Projects Operational Charges
Beban Gedung 2,325,000 2,325,000 Building Expenses
Lain-lain 73,274,036,125 9,197,338,892 Others
Jumlah 341,045,743,524 251,300,717,225 Total

Biaya yang masih harus dibayar dari operasional proyek Accrued expenses of operational projects
adalah utang kepada pihak ketiga sehubungan dengan represent payables to third parties in line with the
kegiatan operasional proyek perusahaan, beban project operations of the Company and others are
gedung, beban kantor, beban pegawai dan beban for building expenses, office expenses, employee
umum. expense and general expenses.

Pada tanggal 30 Juni 2017, beban bunga obligasi yang As of June 30, 2017, accrued bonds interest
masih harus dibayar merupakan beban bunga atas expenses represents interest expenses on the
obligasi Perusahaan yang belum dibayar sebagai Company’s bonds which not yet paid as follows:
berikut:

 Periode tanggal 6 Juni sampai dengan  Period of June 6 until June 30, 2017 for bonds
30 Juni 2017 untuk obligasi tahun 2012; year 2012;
 Periode tanggal 18 Mei 2017 sampai dengan  Period of May 18, 2017 until June 30, 2017 for
30 Juni 2017 untuk obligasi tahun 2014 Tahap I; bonds year 2014 Phase I; and
dan
 Periode tanggal 16 April sampai 30 Juni 2017 untuk  Period of April 16 until June 30, 2017 for
obligasi tahun 2014 Tahap II. bonds year 2014 Phase II.

112
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pada tanggal 31 Desember 2016, beban bunga obligasi As of December 31, 2016, accrued bonds interest
yang masih harus dibayar merupakan beban bunga expenses represents interest expenses on the
atas obligasi Perusahaan yang belum dibayar sebagai Company’s bonds which not yet paid as follows:
berikut:

 Periode tanggal 6 September sampai dengan  Period of September 6 until September, 30,
30 September 2016 untuk obligasi tahun 2012; dan 2016 for bonds year 2012; and
 Periode tanggal 18 Pebruari sampai dengan  Period of February 18 until March 31, 2016 for
31 Maret 2016 untuk obligasi tahun 2014 Tahap I. bonds year 2014 Phase I.

26. LIABILITAS JANGKA PENDEK LAINNYA 26. OTHER SHORT-TERM LIABILITIES

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Kementerian Pekerjaaan Umum dan Perumahan Rakyat 767,080,401,087 -- Ministry of Public Works and Housing
PT MTD Capital 135,348,954,022 -- PT MTD Capital
Jasa Produksi dan Tantiem 51,299,997,249 142,770,846,375 Jasa Produksi dan Tantiem
PT Indo Prima Logistik 28,738,971,589 -- PT Indo Prima Logistik
Iuran Dana Pensiun 5,648,742,405 3,696,810,787 Pension Fund
PT Persada Tanjung Api-api 3,341,807,800 -- PT Persada Tanjung Api-api
Jamsostek 3,322,752,428 6,993,861,543 Jamsostek
PT Energi Bumi Mining 839,734,305 -- PT Energi Bumi Mining
Dividen 21,425,737 -- Dividen
Lain-lain 818,772,088,897 85,832,279,787 Others
Jumlah 1,814,414,875,519 239,293,798,492 Total

27. UTANG BANK JANGKA PANJANG 27. LONG-TERM BANK LOANS

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
Perusahaan/ The Company
PT Bank Mandiri (Persero) Tbk 396,636,814,367 --
Entitas anak / Subsidiaries
WBP:
Utang Bank Sindikasi / Syndication Bank Loan
PT Bank Negara Indonesia (Persero) Tbk dan/ and
PT Bank Rakyat Indonesia (Persero) Tbk 1,448,924,210,893 1,448,924,225,893
WTR:
Utang Bank Sindikasi TJT/ Syndication Bank Loan TJT
PT Bank Rakyat Indonesia (Persero) Tbk
Kredit Investasi/ Investment Credit 755,582,664,180 286,607,670,840
Kredit IDC/ IDC Credit 56,021,757,438 18,358,716,865
Utang Bank Sindikasi SMR/ Syndication Bank Loan SMR
PT Bank Negara Indonesia (Persero) Tbk
Kredit Investasi/ Investment Credit 2,478,646,201,500 1,834,450,303,234
Kredit IDC/ IDC Credit 36,234,062,893 35,448,868,958
PT Bank Rakyat Indonesia (Persero) Tbk
Kredit Investasi/ Investment Credit -- 353,438,737,637
Kredit IDC/ IDC Credit -- 25,052,816,271
WKR:
PT Bank Tabungan Negara (Persero) 120,000,000,000 --
Sub Jumlah/ Sub Total 5,292,045,711,271 4,002,281,339,698

113
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Pihak Ketiga/ Third Parties
WTR, Entitas Anak/ Subsidiary
Utang Bank Sindikasi SMR/ Syndication Bank Loan SMR
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk
Kredit Investasi/ Investment Credit 77,415,629,719 77,584,632,725
Kredit IDC/ IDC Credit 3,504,671,961 3,512,341,235
PT Bank Pembangunan Daerah Jawa Tengah
Kredit Investasi/ Investment Credit 25,974,932,124 57,697,358,268
Kredit IDC/ IDC Credit 1,323,294,596 3,117,555,528
PT Bank Pembangunan Daerah Jawa Timur
Kredit Investasi/ Investment Credit 57,484,836,738 25,993,853,926
Kredit IDC/ IDC Credit 3,106,053,042 1,324,268,218

Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun/


Less: Current Maturity (5,392,000,000) (5,392,000,000)
Jumlah Biaya Restrukturisasi Utang yang Belum Diamortisasi/
Total Unamortized Debt Restructuring Cost (17,382,385,877) (18,230,590,997)
Sub Jumlah/ Sub Total 146,035,032,303 145,607,418,903
Jumlah/ Total 5,438,080,743,574 4,147,888,758,601

Perusahaan The Company

 PT Bank Mandiri (Persero) Tbk  PT Bank Mandiri (Persero) Tbk

Perusahaan memperoleh Fasilitas Kredit Modal The Company entered into a Work Capital
Kerja Transaksional III sebesar Loan Transactional III Facility amounted to
Rp 4.200.000.000.000 dari PT Bank Mandiri Rp 4,200,000,000,000 from PT Bank Mandiri
(Persero) Tbk, sesuai dengan surat Perjanjian (Persero) Tbk, according to a Letter of Credit
Pemberian Kredit tanggal 22 Nopember 2016 yang Facility dated November 22, 2016 which used
digunakan sebagai pembiayaan belanja modal as investment financing to support
untuk mendukung pelaksanaan pembangunan Tol development Semarang Batang Toll Road,
Semarang-Batang, dengan jangka waktu pinjaman with the maturity date 2 (two) years, 4 (four)
2 (dua) tahun 4 (empat) bulan sejak perjanjian di months since the signed agreement, with
tandatangani dengan suku bunga 9,25% per tahun interest 9.25% per annum (Note 20).
(Catatan 20).

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016
saldo pinjaman jangka panjang Perusahaan ke PT the balance of long-term loan to PT Bank
Bank Mandiri (Persero) Tbk masing-masing sebesar Mandiri (Persero) Tbk amounted to
Rp 396.636.814.367 dan nihil. Rp 396,636,814,367 and nil, respectively.

Entitas Anak - WBP The Subsidiary - WBP

 Utang Bank Sindikasi PT Bank Negara Indonesia  Syndicated Bank Loan PT Bank Negara
(Persero) Tbk dan PT Bank Rakyat Indonesia Indonesia (Persero) Tbk and PT Bank Rakyat
(Persero) Tbk Indonesia (Persero) Tbk

Berdasarkan surat No. LMC1/2/442/R dari Akta According to letter No. LMC1/2/442/R from
Perjanjian Kredit No. 66 tanggal 30 Oktober 2015 Credit Agreement Deed No. 66 dated
oleh Notaris Aryani L. Rachim, S.H., di Jakarta. October 30, 2015 by Notary Aryani L. Rachim,
WBP memperoleh fasilitas kredit modal kerja S.H., at Jakarta. WBP entered into the working
dengan perjanjian sindikasi dari PT Bank Negara capital credit with sindicate agreement facilities
Indonesia (Persero) Tbk dan PT Bank Rakyat from PT Bank Negara Indonesia (Persero) Tbk
Indonesia (Persero) Tbk untuk proyek Tol Bekasi- dan PT Bank Rakyat Indonesia (Persero) Tbk
Cawang-Kampung Melayu Tahap I sebesar for the project of Bekasi-Cawang-Kampung
Rp 1.705.720.000.000. Jangka waktu pinjaman Melayu Highways Section I amounted to
selama 3 tahun sejak tanggal 30 Oktober 2015 Rp 1,705,720,000,000. The term of loan for 3
sampai dengan 10 Agustus 2018. Fasilitas-fasilitas years since date October 30, 2015 and will be
pinjaman ini terdiri dari: due to on August 10, 2018. The loan facilities
consist of:

114
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

1. PT Bank Negara Indonesia (Persero) Tbk 1. PT Bank Negara Indonesia (Persero) Tbk
sebesar Rp 852.860.000.000, dan amounted to Rp 852,860,000,000, and
2. PT Bank Rakyat Indonesia (Persero) Tbk 2. PT Bank Rakyat Indonesia (Persero) Tbk
sebesar Rp 852.860.000.000. amounted to Rp 852,860,000,000.

Fasilitas-fasilitas pinjaman ini dijamin dan diikat The loan facilities are collateralized is
dengan: guaranteed and bounded with:

a) Tagihan/ piutang proyek WBP yang dibiayai a) Receivables of project WBP financed and
diikat fidusia sebesar 100% dari nilai kontrak. bonded by fiduciary at 100% of the contract
value.
b) Kepemilikan 60% saham KKDM oleh b) Ownership 60% shares in KKDM through
PT Waskita Toll Road (WTR). PT Waskita Toll Road (WTR).
c) Hak Konsesi Pengusahaan Jalan Tol Bekasi- c) Toll Road Concession Right of Bekasi-
Cawang-Kampung Melayu berdasarkan Cawang-Kampung Melayu based Toll
Perjanjian Pengusahaan Jalan Tol (cessie), Road Concession Agreement (cessie),
termasuk hak untuk mengalihkan Hak including the right to transfer Tenure Toll
Penguasaan Jalan Tol Bekasi-Cawang- Road Bekasi-Cawang-Kampung Melayu to
Kampung Melayu kepada pihak ketiga dan/atau third parties and / or appoint a third party
menunjuk pihak ketiga sebagai Operator Jalan Operator Toll Road, as the implementation
Tol, sebagai pelaksanaan dari ketentuan Akta of Management Rights Act of provisions
Hak Pengelolaan Jalan Tol (cessie). Toll Road (cessie).
d) Tagihan atas klaim asuransi proyek yang d) The bill on insurance claims projects
dibiayai diikat secara fidusia sebesar 100% dari financed and bonded fiduciary equal to
nilai pertanggungan. 100% of the insured amount.

Pembatasan terhadap tindakan: Restrictions of Covenant:

a) Mengalihkan/ menyerahkan kepada pihak lain, a) Hand over to other parties, partially or
sebagian atau seluruhnya atas hak dan entirely on the rights and obligations arising
kewajiban yang timbul berkaitan dengan fasilitas in connection with the credit facility.
kredit.
b) Melakukan perubahan kegiatan usaha b) Making changes to business activities as
sebagaimana tercantum dalam anggaran dasar listed in the basic budget of debtors can
debitur yang dapat mengurangi kemampuan reduce the ability of debtors to pay off the
debitur melunasi fasilitas kredit. credit facility.
c) Mengajukan permohonan pailit atau c) Propose for bankruptcy or a request for a
permohonan penundaan kewajiban pembayaran delay debt obligations to the relevant
utang kepada instansi yang berwenang. authorities.
d) Mengikat diri sebagai penanggung atau d) Act as a guarantor of debt or pledge the
penjamin hutang atau menjaminkan harta assets to other parties related to certain
kekayaan perusahaan kepada pihak lain yang assets as collateral to the debtor
terkait dengan asset tertentu yang dijaminkan syndication.
kepada debitur sindikasi.
e) Melakukan perubahan atas perjanjian jual beli e) Make changes to the conditional sale and
bersyarat dengan hak untuk membeli kembali purchase agreement with the right to
atas saham KKDM No. 24 tanggal 17 Oktober repurchase the shares of KKDM No. 24
2014 yang dibuat dihadapan Jose Dima Satria, dated October 17, 2014 made in presence
S.H., M.Kn, Notaris di Jakarta. of Jose Dima Satria, S.H., M.Kn, Notary in
Jakarta.
f) Menyewakan aset yang dijaminkan di Kreditur f) Rent the assets pledged in Syndicated
Sindikasi kepada pihak lain. Creditors to other parties.
g) Melakukan penjualan aset tetap per tahun g) Making sales of property, plant and
melebihi nilai Rp 500.000.000.000 equipment per year exceeds the value
Rp 500,000,000,000.

115
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Berdasarkan perjanjian ini, WBP diwajibkan untuk Under the agreement, the WBP is required to
mempertahankan rasio keuangan sebagai berikut: maintain the following financial ratios: current
current ratio minimal 1 (satu) kali, debt to equity ratio at least 1 (one), debt to equity ratio of a
ratio maksimal 2,5 (dua koma lima) kali dan debt maximum 2.5 (two point five) and debt service
service coverage minimal 100%. Pemenuhan coverage of at least 100%. The fulfillment of
pembatasan pinjaman bank dilaporkan oleh WBP bank lending restrictions will be reported by
setiap akhir tahun dan akan dievaluasi oleh Bank. WBP at the end of the year and will be
evaluated by the Bank.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016
saldo pinjaman jangka panjang Perusahaan ke PT the balance of long-term loan to PT Bank
Bank Negara Indonesia (Persero) Tbk dan Negara Indonesia (Persero) Tbk and PT Bank
PT Bank Rakyat Indonesia (Persero) Tbk masing- Rakyat Indonesia (Persero) Tbk amounted to
masing sebesar Rp 1.448.924.225.893. Rp 1,448,924,225.893, respectively.

Entitas Anak - WTR Subsidiary - WTR

 Utang Bank Sindikasi TJT, PT Bank Rakyat  Syndicated Bank Loan TJT, PT Bank Rakyat
Indonesia (Persero) Tbk Indonesia (Persero) Tbk
Berdasarkan Akta No. 86 tanggal 29 Mei 2015 dari Based on Deed No. 86 dated May 29, 2015 of
Muchlis Patahna, S.H., MKn, Notaris di Jakarta, Muchlis Patahna, S.H., MKn, Notary in
TJT dan PT Bank Rakyat Indonesia (Persero) Tbk Jakarta, TJT and PT Bank Rakyat Indonesia
menandatangani perjanjian kredit dengan fasilitas (Persero) Tbk signed a loan agreement
kredit maksimum sebesar Rp 1.915.000.000.000 providing a loan facilities with ceiling of
yang terdiri dari kredit investasi dan kredit bunga Rp 1,915,000,000,000 which consists of
masa konstruksi masing-masing sebesar investment credit and interest during
Rp 1.754.000.000.000 dan Rp 161.000.000.000. constructions amounting to
Kedua fasilitas tersebut diberikan untuk keperluan Rp 1,754,000,000,000 and Rp 161,000,000,000,
pembangunan Jalan Tol Ruas Ciawi - Sukabumi respectively. Both loan facilities were provided
seksi 1 (Ciawi - Cigombong) 15,35 Km. for construction of Ciawi - Sukabumi Toll Road
section 1 (Ciawi - Cigombong) 15.35 Km.
Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016
saldo pinjaman jangka panjang TJT ke PT Bank the balance of long-term loan TJT to PT Bank
Rakyat Indonesia (Persero) Tbk masing-masing Rakyat Indonesia (Persero) Tbk amounted to
sebesar Rp 2.487.206.149.302 dan Rp 2,487,206,149,302 and Rp 304,966,387,705,
Rp 304.966.387.705. respectively.

 Utang Bank Sindikasi SMR, PT Bank Negara  Syndicated Bank Loan SMR, PT Bank Negara
Indonesia (Persero) Tbk, PT Bank Rakyat Indonesia (Persero) Tbk, PT Bank Rakyat
Indonesia (Persero) Tbk, PT Bank Pembangunan Indonesia (Persero) Tbk, PT Bank
Daerah Jawa Barat dan Banten Tbk, PT Bank Pembangunan Daerah Jawa Barat dan Banten
Pembangunan Daerah Jawa Tengah Tbk dan Tbk, PT Bank Pembangunan Daerah Jawa
PT Bank Pembangunan Daerah Jawa Timur Tbk. Tengah Tbk dan PT Bank Pembangunan
Daerah Jawa Timur Tbk.

Berdasarkan Akta Notaris Muchlis Patahna, Based on Notarial Deed No. 18 of Muchlis
S.H.,M.Kn., No. 18 tanggal 31 Januari 2008, Patahna, S.H., M Kn., dated January 31, 2008,
SMR telah menandatangani Perjanjian Kredit SMR signed a Syndicated Loan Agreement
Sindikasi dengan PT Bank Negara Indonesia with PT Bank Negara Indonesia (Persero) Tbk,
(Persero) Tbk, PT Bank Rakyat Indonesia (Persero) PT Bank Rakyat Indonesia (Persero) Tbk,
Tbk, PT Bank Pembangunan Daerah Jawa Barat PT Bank Pembangunan Daerah Jawa Barat
dan Banten Tbk, PT Bank Pembangunan Daerah and Banten Tbk, PT Bank Pembangunan
Jawa Tengah Tbk dan PT Bank Pembangunan Daerah Jawa Tengah Tbk and PT Bank
Daerah Jawa Timur Tbk. Pembangunan Daerah Jawa Timur Tbk.

116
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Kelima bank tersebut memberikan fasilitas kredit These five banks are providing a credit facility
maksimum sebesar Rp1.356.275.000.000 yang with a credit ceiling of Rp 1,356,275,000,000
terdiri dari kredit investasi dan kredit bunga masa which consists of investment credit and
konstruksi masing-masing sebesar interest during contructions amounted to
Rp 1.242.143.000.000 dan Rp 114.132.000.000. Rp 1,242,143,000,000 and Rp 114,132,000,000,
Kedua fasilitas tersebut diberikan untuk keperluan respectively. Both facilities are provided for the
pembangunan Jalan Tol Ruas Kanci - Pejagan. construction of Kanci – Pejagan section toll
road.

Jangka waktu kredit investasi dan kredit Interest The term loan of investment credit and Interest
During Construction (IDC) adalah 38 triwulan atau During Construction credit (IDC) was for 38
9,5 tahun termasuk masa tenggang 8 triwulan atau quarter or 9.5 years including a grace period of
2 tahun sejak tanggal efektif. Suku bunga pinjaman 8 quarter or 2 years from the effective date.
ini adalah rata-rata tertimbang atas dasar suku The interest rate of this loan is the weighted
bunga yang disampaikan masing-masing kreditur average interest rate on the basis of submitted
kepada agen fasilitas untuk pertama kali adalah by each creditor to the facility agent for the first
sebesar 14,5% per tahun. time is 14.5% per annum.

Berdasarkan Akta Notaris Muchlis Patahna, S.H., Based on Notarial Deed No. 39 of Muchlis
M.Kn., No. 39 tanggal 16 Agustus 2012, Patahna, S.H., M.Kn., dated August 16, 2012,
Perusahaan telah menandatangani perjanjian the Company signed an amendment of loan
perubahan atas perjanjian kredit sindikasi dengan syndication agreement with PT Bank Negara
PT Bank Negara Indonesia (Persero) Tbk, PT Bank Indonesia (Persero) Tbk, PT Bank Rakyat
Rakyat Indonesia (Persero) Tbk, PT Bank Indonesia (Persero) Tbk, PT Bank
Pembangunan Daerah Jawa Barat dan Banten Tbk, Pembangunan Daerah Jawa Barat and Banten
PT Bank Pembangunan Daerah Jawa Tengah Tbk Tbk, PT Bank Pembangunan Daerah Jawa
dan PT Bank Pembangunan Daerah Jawa Timur Tengah Tbk, and PT Bank Pembangunan
Tbk dimana dilakukan restrukturisasi atas utang Daerah Jawa Timur Tbk where WTR debt
WTR dengan merubah beberapa ketentuan dalam restructured by changing certain clause in the
Perjanjian Kredit Sindikasi awal, antara lain: initial Syndicated Credit Agreement, among
others:

a) Memperpanjang jangka waktu pelunasan utang a) Extend the term of loan payment to
menjadi tanggal 30 Januari 2023 untuk kredit January 30, 2023 for investment credit and
investasi dan kredit IDC dengan tanggal IDC with the initial payment date
pembayaran awal (prepayment) pada (prepayment) at December 31, 2016;
31 Desember 2016;
b) Mengubah suku bunga utang menjadi minimal b) Changing loan interest rate to a minimum
6% per tahun sampai dengan tanggal of 6% per annum, up to the date of
prepayment dan 12% per tahun setelah tanggal prepayment and 12% per annum after the
prepayment sampai dengan tanggal pelunasan date of prepayment until the date of debt
utang dan menetapkan biaya tambahan yaitu payment and determined the additional
exit fee sebesar 6% per tahun dan cost such as exit fee amounted to 6% per
administration fee sebesar minimal 3% per annum and administration fee of at least
tahun sampai dengan tanggal prepayment; dan 3% per annum, until the date of
prepayment; and

c) Mengijinkan WTR untuk mengubah susunan c) WTR allowed to change shareholders’


kepemilikan saham. structure.

Berdasarkan Akta Notaris Muchlis Patahna, Based on Notarial Deed No. 18 of Muchlis
S.H.,M.Kn., No. 18 tanggal 31 Mei 2013, WTR telah Patahna, S.H., M.Kn., dated May 31, 2013,
menandatangani addendum restrukturisasi utang WTR signed an addendum debt restructuring
WTR atas Perjanjian Kredit Sindikasi dengan of loan syndication agreement with PT Bank
PT Bank Negara Indonesia (Persero) Tbk, PT Bank Negara Indonesia (Persero) Tbk, PT Bank
Rakyat Indonesia (Persero) Tbk, PT Bank Rakyat Indonesia (Persero) Tbk, PT Bank
Pembangunan Daerah Jawa Barat dan Banten Tbk, Pembangunan Daerah Jawa Barat and Banten
PT Bank Pembangunan Daerah Jawa Tengah Tbk Tbk, PT Bank Pembangunan Daerah Jawa
dan PT Bank Pembangunan Daerah Jawa Timur Tengah Tbk, and PT Bank Pembangunan
Tbk dengan mengubah beberapa ketentuan antara Daerah Jawa Timur Tbk by changing certain
lain: clause among others:

117
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

a) Mengubah suku bunga utang menjadi 11% per a) Changing loan interest rate to 11% per
tahun setelah tanggal prepayment sampai annum, after the date of prepayment until
dengan tanggal pelunasan utang dan mengubah the due date of the debt and changing exit
biaya exit fee sebesar 4% per tahun dan fee surcharge of 4% per annum and
administration fee sebesar minimal 1% per administration fee of at least 1% per annum
tahun sampai dengan tanggal prepayment; dan to date of prepayment, and

b) Mengubah susunan jaminan WTR. b) Changing the composition of WTR


guarantee.

Jaminan atas pinjaman yang disyaratkan dalam WTR has fulfilled collateral for the loans
Perjanjian Kredit Sindikasi telah dipenuhi oleh required in the Syndicated Loan Agreement.
WTR.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016 As of June 30, 2017 and December 31, 2016
saldo pinjaman jangka panjang SMR ke PT Bank the balance of long-term loan SMR to PT Bank
Negara Indonesia (Persero) Tbk, PT Bank Rakyat Negara Indonesia (Persero) Tbk, PT Bank
Indonesia (Persero) Tbk, PT Bank Pembangunan Rakyat Indonesia (Persero) Tbk, PT Bank
Daerah Jawa Barat dan Banten Tbk, PT Bank Pembangunan Daerah Jawa Barat dan
Pembangunan Daerah Jawa Tengah Tbk dan PT Banten Tbk, PT Bank Pembangunan Daerah
Bank Pembangunan Daerah Jawa Timur Tbk Jawa Tengah Tbk dan PT Bank
masing-masing sebesar Rp 675.219.748.654 dan Pembangunan Daerah Jawa Timur Tbk.
Rp 2.393.998.145.003. amounted to Rp 675,219,748,654 and
Rp 2,393,998,145,003, respectively.

28. UTANG PEMBELIAN ASET TETAP 28. DEBT PURCHASES OF FIXED ASSETS

Entitas anak, WTR menandatangani Perjanjian Utang – A subsidiary, WTR entered into Loan for Purchase
Pembelian Aset Tetap untuk pembelian kendaraan of Fixed Assets Agreement in order to purchase
bermotor dengan rincian sebagai berikut: vehicles with detail as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

PT MNC Finance 155,395,853 223,103,688 PT MNC Finance


PT Astra Sedaya Finance 83,785,289 306,432,000 PT Astra Sedaya Finance
PT Astrido 242,512,509 PT Astrido
Dikurangi bagian jatuh tempo Less: current portion maturities
dalam waktu satu tahun (159,043,800) (224,284,004) in one year
Bagian Jangka Panjang 322,649,851 305,251,684 Long-Term Portion

Utang pembelian aset tetap dikenakan bunga sebesar Debt purchases of fixed assets bears interest at
17% per tahun dan jatuh tempo paling akhir 23 Mei 17% per annum with maturity date on May 23,
2018. Utang pembelian aset tetap dijamin dengan aset 2018. Debt of fixed assets secured by
yang dibeli. the purchased assets.

29. UTANG OBLIGASI - BERSIH 29. BONDS PAYABLE - NET

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Nominal 7,232,000,000,000 5,575,000,000,000 Face Value


Pelunasan (675,000,000,000) Payment
Biaya Emisi Obligasi (15,556,620,317) (13,329,116,048) Bonds Issuance Cost
Akumulasi Amortisasi 7,922,215,601 5,854,320,716 Accumulated Amortization
Jumlah 6,549,365,595,284 5,567,525,204,668 Total

118
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Biaya Emisi Obligasi 15,556,620,317 13,329,116,048 Bonds Issuance Cost
Dikurangi : Akumulasi Amortisasi (7,922,215,601) (5,854,320,716) Less: Accumulated Amortization
Biaya Emisi Obligasi Unamortized Bond
Belum Diamortisasi 7,634,404,716 7,474,795,332 Issuance Costs

Berdasarkan Akta Perjanjian Perwaliamanatan No. 02 Based on the Trusteeship Agreement Deed No. 02
tanggal 2 Pebruari 2017 yang dibuat dihadapan Fathiah dated February 2, 2017 from Fathiah Helmi, S.H.,
Helmi, S.H., Notaris di Jakarta. Perusahaan Notary in Jakarta. The Company issued Shelf
menerbitkan Obligasi Berkelanjutan II Waskita Karya Registration Bond II Waskita Karya Phase III Year
Tahap III Tahun 2017 sebesar Rp 1.657.000.000.000 2017 amounted to Rp 1,657,000,000,000 which
yang dibagi dalam dua seri: consists of two tranches:

 Seri A dengan dengan tingkat bunga tetap 8,50%  Tranche A with fixed interest rate of 8.50%
per tahun dengan nilai Rp 747.000.000.000. per annum with value of Rp 747,000,000,000.

 Seri B dengan dengan tingkat bunga tetap 9% per  Tranche B with fixed interest rate of 9% per
tahun dengan nilai Rp 910.000.000.000. annum with value of Rp 910,000,000,000.

Berdasarkan Akta Perjanjian Perwaliamanatan No. 55 Based on the Trusteeship Agreement Deed No. 55
tanggal 9 September 2016 yang dibuat dihadapan dated September 9, 2016 from Fathiah Helmi, S.H.
Fathiah Helmi, S.H., Notaris di Jakarta. Perusahaan The Company has issued Shelf Registration Bond
menerbitkan Obligasi Berkelanjutan II Waskita Karya II Waskita Karya Phase II Year 2016 with fixed
Tahap II Tahun 2016, dengan tingkat bunga tetap 8,5% interest rate of 8.5% p.a. with value of
per tahun dengan nilai Rp 900.000.000.000. Rp 900,000,000,000.

Berdasarkan Akta Perjanjian Perwaliamanatan No. 22 Based on the Trusteeship Agreement Deed No. 22
tanggal 4 April 2016 yang dibuat dihadapan Fathiah dated April 4, 2016 from Fathiah Helmi, S.H., The
Helmi, S.H., Notaris di Jakarta. Perusahaan Company has issued Shelf Registration Bond II
menerbitkan Obligasi berkelanjutan II Waskita Karya Waskita Karya Phase I Year 2016 with fixed
Tahap I tahun 2016, dengan tingkat bunga tetap 9,25% interest rate of 9.25% p.a. with value of
per tahun dengan nilai Rp 2.000.000.000.000. Rp 2,000,000,000,000.

Berdasarkan Akta Perjanjian Perwaliamanatan Based on the Trusteeship Agreement Deed No. 29
No. 29 tanggal 29 September 2015 yang dibuat di dated September 29, 2015 by notary Fathiah
hadapan Fathiah Helmi, S.H., Perusahaan telah Helmi, S.H., The Company has issued Shelf
menerbitkan Obligasi Berkelanjutan I Waskita Karya Registration Bond I Waskita Karya Phase II Year
Tahap II tahun 2015 sebesar Rp 1.500.000.000.000 2015 amounted to Rp 1,500,000,000,000 which
yang dibagi dalam dua seri: consist of two tranches:

 Seri A dengan dengan tingkat bunga tetap 11,10%  Tranche A with fixed interest rate of 11.10%
per tahun dengan nilai Rp 1.150.000.000.000. p.a. with value of Rp 1,150,000,000,000.

 Seri B dengan dengan tingkat bunga tetap 10,40%  Tranche B with fixed interest rate of 10.40%
per tahun dengan nilai Rp 350.000.000.000. p.a. with value of Rp 350,000,000,000.

Berdasarkan Akta Perjanjian Perwaliamanatan No. 11 Based on the Trusteeship Agreement Deed No. 11
tanggal 4 April 2012 juncto Akta Perubahan I Perjanjian dated April 4, 2012 in conjunction with the Deed of
Perwaliamanatan No. 98 tanggal 26 April 2012 Amendment I Trustee Agreement No. 98 dated
sehubungan dengan Akta Perubahan II Perjanjian April 26, 2012 in conjunction with the Deed of
Perwaliamanatan No. 58 tanggal 23 Mei 2012 yang Amendment II Trustee Agreement No. 58 dated
ketiganya dibuat di hadapan Notaris Fathiah Helmi, May 23, 2012 which all are made in front of Notary
S.H., Perusahaan telah menerbitkan Obligasi II Waskita Fathiah Helmi, S.H., The Company has issued
Karya Tahun 2012 sebesar Rp 750.000.000.000 yang Bond II Waskita Karya 2012 amounted to
dibagi dalam dua seri: Rp 750,000,000,000 which consist of two tranches:

 Seri A dengan dengan tingkat bunga tetap 8,75%   Tranche A with fixed interest rate of 8.75%
per tahun dengan nilai Rp 75.000.000.000. Obligasi p.a. with value of Rp 75,000,000,000. This
ini telah dibayar lunas pada tanggal 5 Juni 2015. bond has been fully paid on June 5, 2015.

 Seri B dengan dengan tingkat bunga tetap 19,75%   Tranche B with fixed interest rate of 19.75%
per tahun dengan nilai Rp 675.000.000.000. p.a. with value of Rp 675,000,000,000.

119
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Berdasarkan pemeringkatan yang diterbitkan oleh Based on the rating issued by PT Pemeringkat
PT Pemeringkat Efek Indonesia (Pefindo) tanggal Efek Indonesia (Pefindo) dated March 14, 2017,
14 Maret 2017, peringkat obligasi adalah idA- (positive the bonds are rated as idA- (positive outlook).
outlook).

Beban bunga dan amortisasi biaya transaksi atas utang Interest expense and amortization of transaction
obligasi di 2017 dan 2016, masing-masing sebesar cost on the obligation payable in 2017 and 2016
Rp 152.633.162.458 dan Rp 88.028.045.479. amounted to Rp 152,633,162,458 and
Sedangkan beban bunga yang belum dibayarkan pada Rp 88,028,045,479, respectively. Meanwhile, as of
30 Juni 2017 dan 31 Desember 2016 masing-masing June 30, 2017 and December 31, 2016 the balance
sebesar Rp 72.321.611.114 dan Rp 56.570.486.113 of accrued interest expense amounted to Rp
(Catatan 25). 72,321,611,114 and Rp 56,570,486,113,
respectively (Note 25).

Utang obligasi ini mensyaratkan Perusahaan untuk Bonds payable requires the Company to mantain
mempertahankan rasio keuangan sebagai berikut: financial ratios as follows:

 Current ratio tidak kurang dari 1 : 1 (satu  Current ratio of not less than 1 : 1 (one is to
berbanding satu); one);
 Debt to Equity tidak lebih dari 3 : 1 (tiga berbanding  Debt to Equity no more than 3 : 1 (three is to
satu); dan one); and
 Earning Before Interest, Tax, Depreciation and  Earning Before Interest, Tax, Depreciation
Amortization (EBITDA) dengan Beban Bunga and Amortization (EBITDA) to Interest
Pinjaman tidak kurang dari 1,5 : 1 (satu koma lima Expense are not less than 1.5 : 1 (one point
berbanding satu). five is to one).

Evaluasi pemenuhan atas persyaratan rasio dari The evaluation of the fulfillment of these
penerbitan obligasi dilakukan pada setiap akhir tahun. requirements is held on each year end.

30. UTANG LAIN-LAIN JANGKA PANJANG 30. OTHER LONG-TERM PAYABLES

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
Koperasi Waskita -- 758,827,856
Lain-lain/ Others 95,153,273
Sub Jumlah/ Sub Total -- 853,981,129
Pihak Ketiga/ Third Parties
Kementerian Pekerjaan Umum dan
Perumahan Rakyat/
Ministry of Public Works and Housing 1,907,228,116,410 1,422,598,680,688
PT Sarana Multi Infrastruktur 532,265,787,314 500,000,000,000
PT MNC Tol Investama -- 25,680,518,564
PT Daya Anugrah Manunggal 675,820,000 775,820,000
Lain-lain/ Others 188,051,265 4,144,882,899
Sub Jumlah/ Sub Total 2,440,357,774,989 1,953,199,902,151
Jumlah/ Total 2,440,357,774,989 1,954,053,883,280

120
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

31. UANG MUKA KONTRAK JANGKA PANJANG 31. ADVANCES ON LONG-TERM CONTRACT

Rincian saldo uang muka kontrak jangka panjang The details of outstanding advances on long-term
sebagai berikut: contract were as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Pihak Berelasi/ Related Parties
PT Solo Ngawi Jaya 56,198,223,812 180,493,834,314
PT Jasamarga Kualanamu Toll -- 28,767,463,977
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 9,240,722,249 10,410,862,290
Sub Jumlah/ Sub Total 65,438,946,061 219,672,160,581
Pihak Ketiga/ Third Parties
Kementerian Pekerjaan Umum dan
Perumahan Rakyat/
Ministry of Public Works and Housing 290,355,809,683 433,295,305,569
Kementerian Perhubungan/ Ministry of Transportation 150,329,609,443 173,247,623,377
Ministry of Transport and Communication of the
Democratic Republic of Timor Leste 53,248,764,894
Pemerintah Daerah/ District Governments 65,057,514,145 91,079,922,107
Kementerian Pekerjaan Umum Republik Demokrasi
Timor Leste/
Ministry of Public Works Democratic
Republic of Timor Leste 40,445,103,258 58,115,848,810
Bandar udara Internasional Jawa Barat/
West Java International Airport 20,058,339,926 --
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 57,023,962,038 249,655,170,009
Sub Jumlah/ Sub Total 623,270,338,493 1,058,642,634,766
Jumlah/ Total 688,709,284,554 1,278,314,795,347

32. LIABILITAS IMBALAN KERJA 32. EMPLOYEE BENEFIT LIABILITIES

Rincian kewajiban imbalan pascakerja sesuai UU The detail of post-employment benefits under
Ketenagakerjaan No. 13/2003 dan kewajiban manfaat Labor Law No 13/2003 and other long-term benefit
jangka panjang lainnya berdasarkan entitas yang based on its entities which presented in
disajikan dalam laporan keuangan interim consolidated interim statements of financial
konsolidasian adalah sebagai berikut: position are as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Perusahaan/ the Company 79,880,602,711 58,962,127,016


Entitas Anak/ Subsidiaries
PT Cimanggis Cibitung Tollways 481,573,172 481,573,172
PT Semesta Marga Raya 2,809,690,660 2,809,690,660
PT Trans Jabar Tol 2,157,233,328 2,157,233,328
PT Sriwijaya Markmore Persada 936,985,992 936,985,992
PT Kresna Kusuma Dyandra 1,674,999,273 --
PT Waskita Beton Precast Tbk 2,934,766,505 1,991,939,732
Jumlah/ Total 90,875,851,641 67,339,549,900

Perusahaan menyelenggarakan program pensiun The Company provides a defined benefit and other
imbalan pasti dan imbalan kerja jangka panjang lainnya long term benefit covering all the qualified
untuk semua karyawan yang memenuhi persyaratan. employees.

Nilai kewajiban yang termasuk dalam laporan posisi The amounts of liabilities included in the interim
keuangan interim dari manfaat pasca-kerja di bawah statements of financial position arising from
UU Ketenagakerjaan No. 13/2003 dan kewajiban postemployment benefits under Labor Law
manfaat jangka panjang lainnya adalah sebagai berikut: No. 13/2003 and other long-term benefit are as
follows:

121
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Imbalan pascakerja sesuai Post-employment benefits under


UU Ketenagakerjaan No.13/2003 61,460,978,249 58,962,127,016 Labor Law No. 13/2003
Manfaat jangka panjang lainnya 18,419,624,462 -- Other long-term benefit
Nilai Kini Kewajiban Imbalan Kerja - Akhir 79,880,602,711 58,962,127,016 Present Value Benefit Obligation - Ending

Perusahaan The Company

Dana pensiun ini dikelola oleh PT Asuransi Jiwasraya The pension plan is managed by PT Asuransi
(Persero) yang akta pendiriannya telah disahkan oleh Jiwasraya (Persero), the deed of establishment of
Menteri Keuangan Republik Indonesia dengan KEP- which was approved by the the Minister of
84/MK/IV/2/1973 tanggal 28 Pebruari 1973. Pada tahun Finance of the Republic of Indonesia in his
2006, Perusahaan menandatangani perjanjian kerja decision letter KEP-84/MK/IV/2/1973 dated
sama No. WK: L.20/P/WK/2006 dan No. AJS: February 28, 1973. In 2006, the Company signed
079.SJ.U.076 antara PT Waskita Karya (Persero) Tbk a cooperation agreement No. WK: L.20/P/WK/2006
dan PT Asuransi Jiwasraya (Persero) tanggal 28 Juli and No. AJS: 079.SJ.U.076 between PT Waskita
2006 tentang Pengelolaan Program Asuransi Pesangon Karya (Persero) Tbk and PT Asuransi Jiwasraya
Kumpulan dan Addendum I Perjanjian Kerjasama (Persero) on July 28, 2006 concerning to
No. L.20/P/WK/2006; No. 079 Sj. U. 0706 tanggal Management of Severance Group Insurance
25 April 2008. Program and Addendum I to Cooperation
Agreement No. L.20/P/WK/2006; No. 079 SJ. U.
0706 on April 25, 2008.

Imbalan kerja memberikan eksposur Perusahaan Employee benefit typically exposes the Company
terhadap risiko aktuarial seperti risiko investasi, risiko to actuarial risks such as investment risk, interest
tingkat bunga, risiko harapan hidup dan risiko gaji. rate risk, longevity risk and salary risk.

Risiko Investasi Investment risk

Nilai kini kewajiban imbalan pasti dihitung The present value of the defined benefit plan
menggunakan tingkat diskonto yang ditetapkan dengan liability is calculated using a discount rate
mengacu pada imbal hasil obligasi korporasi determined by reference to high quality corporate
berkualitas tinggi; jika pengembalian aset program di bond yields; if the return on plan asset is below
bawah tingkat tersebut, hal itu akan mengakibatkan this rate, it will create a plan deficit. Currently the
defisit program. Saat ini program tersebut memiliki plan has a relatively balanced investment in equity
investasi yang relatif seimbang pada efek ekuitas, securities, debt instruments and real estates. Due
instrumen utang dan real estat. Karena sifat jangka to the long-term nature of the plan liabilities, the
panjang dari liabilitas program, dewan dana pensiun board of the pension fund considers it appropriate
perlu menetapkan bahwa bagian wajar dari aset that a reasonable portion of the plan assets should
program harus diinvestasikan pada efek ekuitas dan be invested in equity securities and in real estate
real estate untuk meningkatkan imbal hasil yang to leverage the return generated by the fund.
dihasilkan oleh dana.

Risiko Tingkat Bunga Interest Risk

Penurunan suku bunga obligasi akan meningkatkan A decrease in the bond interest rate will increase
liabilitas program; namun, sebagian akan saling hapus the plan liability; however, this will be partially
oleh peningkatan imbal hasil atas investasi instrumen offset by an increase in the return on the plan’s
utang. debt investments.

Risiko Harapan Hidup Longevity risk

Nilai kini kewajiban imbalan pasti dihitung dengan The present value of the defined benefit plan
mengacu pada estimasi terbaik dari mortalitas peserta liability is calculated by reference to the best
program baik selama dan setelah kontrak kerja. estimate of the mortality of plan participants both
Peningkatan harapan hidup peserta program akan during and after their employment. An increase in
meningkatkan liabilitas program. the life expectancy of the plan participants will
increase the plan’s liability.

122
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Risiko Gaji Salary Risk

Nilai kini kewajiban imbalan pasti dihitung dengan The present value of the defined benefit plan
mengacu pada gaji masa depan peserta program. liability is calculated by reference to the future
Dengan demikian, kenaikan gaji peserta program akan salaries of plan participants. As such, an increase
meningkatkan liabilitas program itu. in the salary of the plan participants will increase
the plan’s liability.

a. Program Imbalan Pasca-kerja a. Post-employment Benefit Plan

Perusahaan menyelenggarakan program pensiun The Company established defined benefit


imbalan pasti Program ini memberikan imbalan pension plan covering all the local permanent
pensiun berdasarkan penghasilan dasar pensiun employees. This plan provides pension
dan masa kerja karyawan. Perusahaan telah benefits based on years of service and
membukukan liabilitas manfaat karyawan sesuai salaries of the employees. The Company has
dengan Undang-Undang No. 13 Tahun 2003 recorded liabilities of employee benefits in
tentang Ketenagakerjaan, menggunakan teknik accordance with Law No. 13 Year 2003
aktuarial, dalam rangka penerapan PSAK No. 24 regarding to matter pertaining to man power,
(Revisi 2013) tentang Imbalan Kerja. using actuarial techniques, within the
framework of the implementation of
Indonesian PSAK No. 24 (Revised 2013) of
Employee Benefits.

Dana pensiun ini dikelola oleh PT Asuransi The pension plan is managed by PT Asuransi
Jiwasraya (Persero) yang akta pendiriannya telah Jiwasraya (Persero), the deed of
disahkan oleh Menteri Keuangan Republik establishment of which was approved by the
Indonesia dengan KEP-84/MK/IV/2/1973 tanggal the Minister of Finance of the Republic of
28 Pebruari 1973. Indonesia in his decision letter KEP-
84/MK/IV/2/1973 dated February 28, 1973.

Liabilitas imbalan pasca-kerja Perusahaan The amounts included in the statement of


sehubungan dengan program pensiun yang financial position arising from the Company’s
termasuk dalam laporan posisi keuangan obligation in respect of the defined benefits
konsolidasian adalah sebagai berikut: plan is as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Nilai Kini Kewajiban 283,939,144,262 280,478,861,727 Present Value of Funded Obligations


Nilai
StatusWajar Aset Program
Pendanaan (222,478,166,013)
61,460,978,249 (221,516,734,711)
58,962,127,016 Fair Value Funded
of Plan Assets
Status
Liabilitas Bersih yang Timbul Net Liability Arising from
dari Kewajiban Imbalan Pasti 61,460,978,249 58,962,127,016 Defined Benefits Obligation

Mutasi nilai kini kewajiban imbalan pasti adalah Movements in the present value of the defined
sebagai berikut: benefit obligation were as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Saldo awal nilai kini liabilitas 280,478,861,727 251,577,075,998 Beginning Balance


Biaya jasa kini 5,014,482,844 19,563,579,141 Current Service Cost
Biaya bunga 5,596,617,964 21,605,767,185 Interest Cost
(Keuntungan) kerugian kurtailment -- 16,907,905,319 (Gain) loss from curtailment
Imbalan yang dibayarkan (6,433,943,701) (30,188,140,980) Benefits payment
Pengukuran kembali liabilitas (aset) Remeasurement on the net defined
imbalan pasti neto: benefit (asset) liability:
(Keuntungan) kerugian aktuarial yang Actuarial (gains)/losses arising
timbul dari penyesuaian pengalaman (2,732,707,338) 3,860,291,168 from experience adjustment
(Keuntungan) kerugian aktuarial yang Actuarial (gains)/losses arising
timbul dari perubahan asumsi from changes in financial
keuangan 2,015,832,766 (2,847,616,104) assumptions
Ending Balance of Present Value
Saldo Akhir Nilai Kini Liabilitas 283,939,144,262 280,478,861,727 Obligation

123
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Mutasi nilai wajar dari aset program adalah sebagai Movements in the fair value of the plan assets
berikut: were as follows:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Nilai wajar aset program- awal 221,516,734,711 190,238,992,030 Opening fair value of plan assets
Pengukuran kembali keuntungan (kerugian): Remeasurement gain (loss):
Imbal hasil aset program (tidak termasuk jumlah Return
Returnon
onplan
planassets
assets(excluding
(excludingamounts
amounts
yang dimasukkan dalam beban bunga neto) 4,430,334,694 17,121,509,283 included in net interest expense)
Kontribusi pemberi kerja 8,619,169,908 40,492,291,238 Contributions from the employer
Selisih kurs atas program dalam valuta asing (6,019,476,589) 1,279,770,031 Contributions from the employer
Pembayaran manfaat (6,068,596,711) (27,615,827,871) Benefits paid
Closing Fair Value of Plan Assets -
Nilai Wajar Aset Program - Akhir 222,478,166,013 221,516,734,711 Ending

Asumsi aktuarial yang signifikan untuk penentuan Significant actuarial assumptions for the
kewajiban imbalan pasti adalah tingkat diskonto, determination of the defined obligation are
kenaikan gaji yang diharapkan dan mortalitas. discount rate, expected salary increase and
Sensitivitas analisis di bawah ini ditentukan mortality. The sensitivity analyses below have
berdasarkan masing-masing perubahan asumsi been determined based on reasonably
yang mungkin terjadi pada akhir periode pelaporan, possible changes of the respective
dengan semua asumsi lain konstan. assumptions occurring at the end of the
reporting period, while holding all other
assumptions constant.

 Jika tingkat diskonto lebih tinggi (lebih rendah)  If the discount rate is 1% higher (lower), the
1%, kewajiban imbalan pasti akan menurun defined benefit obligation would decrease
sebesar Rp 3.976.512.093 (meningkat sebesar by Rp 3,976,512,093 (increase by
Rp 3.895.624.330). Rp 3,895,624,330).

 Jika pertumbuhan gaji yang diharapkan  If the expected salary growth increases
meningkat (menurun) sebesar 1%, kewajiban (decreases) by 1%, the defined benefit
imbalan pasti akan meningkat sebesar obligation would increase by
Rp 13.444.276.558 (menurun sebesar Rp 13,444,276,558 (decrease by
Rp 13.461.895.466). Rp 13,461,895,466).

 Jika harapan hidup meningkat (menurun) dalam   If the life expectancy increases (decreases)
satu tahun untuk pria dan wanita, kewajiban by one year for both men and women, the
imbalan pasti akan meningkat Rp 9.309.768.093 defined benefit obligation would increase by
(menurun sebesar Rp 9.329.957.672). Rp 9,309,768,093 (decrease by
Rp 9,329,957,672).

Durasi rata-rata dari kewajiban imbalan pada The average duration of the benefit obligation
tanggal 30 Juni 2017 adalah 17,03 tahun dan at June 30, 2017 is 17.03 years and at
31 Desember 2016 adalah 17,21 tahun. December 31, 2016 is 17.21 years.

b. Imbalan Jangka Panjang Lainnya c. b. Other Long-term Benefits

Perusahaan juga menyediakan manfaat cuti besar The Company also provides long service
untuk karyawan yang telah bekerja selama 6 tahun leave to the employee who have already
dalam bentuk satu kali gaji. rendered 6 years of service in the form of cash
amounting one time salary.

Mutasi nilai kini kewajiban imbalan jangka panjang Movements in the present value long-term
lainnya adalah sebagai berikut: benefits obligations were as follows:

124
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp

Saldo Awal Nilai Kewajiban Manfaat Beginning Balance Long-Term


Jangka Panjang Lainnya -- -- Benefits Obligation
Biaya Jasa Kini 634,338,661 -- Current Service Cost
Biaya Bunga 364,041,804 -- Interest Cost
Biaya Jasa Lalu 18,202,090,216 -- Past Service Cost
(Keuntungan) Kerugian Kurtailment (780,846,219) -- (Gain) Loss from Curtailment
Saldo Akhir Nilai Kewajiban Manfaat Ending Balance Long-Term
Jangka Panjang Lainnya 18,419,624,462 -- Benefits Obligation

Perhitungan imbalan pasca-kerja dihitung oleh The cost of providing post-employment


aktuaris independen PT Praptasentosa Gunajasa. benefits is calculated by independent actuary,
Asumsi aktuarial pada tanggal 30 Juni 2017 dan 31 PT Praptasentosa Gunajasa. Actuarial
Desember 2016 sebagai berikut: assumptions as of June 30, 2017 and
December 31, 2016 as follows:

31 Maret 2017/ 31 Desember 2016/


March 31, 2017 December 31, 2016

Tingkat Diskonto 7,50% 8% Discount Rate


Tingkat Kenaikan Gaji 8% 8% Annual Salary Increasing Rate
Tingkat Mortalitas TMI 2011 TMI 2011 Mortality Rate
Tingkat Cacat 0% TMI 2011 0% TMI 2011 Disability Rate
Umur Pensiun Normal 56 56 Normal retirement age

33. MODAL SAHAM 33. SHARE CAPITAL


a. Modal Saham a. Share Capital
Sesuai daftar pemegang saham yang dikeluarkan According to shareholders list from Biro
oleh Biro Administrasi Efek, PT Datindo Entrycom, Adminstrasi Efek, PT Datindo Entrycom,
susunan pemegang saham Perusahaan adalah the composition of the Company’s capital were
sebagai berikut: as follows:
30 Juni/ June 30, 2017
Persentase Jumlah Modal
Kepemilikan/ Disetor/
Jumlah Saham/ Percentage of Total Paid In
Total Shares Ownership Capital
Modal Dasar 26,000,000,000 2,600,000,000,000 Authorized Capital

Modal Ditempatkan dan Disetor Penuh: Subscribed and Fully Paid Capital:
Saham Preferen (Seri A Dwiwarna) Preferred Stock (Dwi Warna Serie A)
Pemerintah Republik Indonesia 1 0000% 100 Government of Republic of Indonesia
Saham Biasa (Seri B) Common Stock (Serie B)
Pemerintah Republik Indonesia 8,963,697,886 66004% 896,369,788,600 Government of Republic of Indonesia
Masyarakat (kepemilikan <0,5%) 4,610,011,563 33096% 461,001,156,300 Public (each holding <0.5%)
Jumlah Modal Ditempatkan
dan Disetor Penuh 13,573,709,450 100000% 1,357,370,945,000 Total Issued and Fully Paid

125
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

31 Desember/ December 2016


Persentase Jumlah Modal
Kepemilikan/ Disetor/
Jumlah Saham/ Percentage of Total Paid In
Total Shares Ownership Capital
Modal Dasar 26.000.000.000 2.600.000.000.000 Authorized Capital

Modal Ditempatkan dan Disetor Penuh: Subscribed and Fully Paid Capital:
Saham Preferen (Seri A Dwiwarna) Preferred Stock (Dwi Warna Serie A)
Pemerintah Republik Indonesia 1 0,00% 100 Government of Republic of Indonesia
Saham Biasa (Seri B) Common Stock (Serie B)
Pemerintah Republik Indonesia 8.963.697.886 66,04% 896.369.788.600 Government of Republic of Indonesia
Masyarakat (kepemilikan <0,5%) 4.609.956.663 33,96% 460.995.666.300 Public (each holding 0.5%)
Jumlah Modal Ditempatkan Total Issued
dan Disetor Penuh 13.573.654.550 100,00% 1.357.365.455.000 and Fully Paid

Dibawah ini merupakan Akta Notaris terakhir pada Below are the latest Notarial Deed in 2017 and
tahun 2017 dan 2016 terkait modal saham: 2016 related to share capital:
 Berdasarkan Akta No. 46 tanggal 26 Mei  Based on the Deed No. 46 dated May 26,
2015 oleh Fathiah Helmi, S.H., Notaris di 2015 of Fathiah Helmi, S.H., Notary in Jakarta,
Jakarta, pemegang saham menyetujui the Company’s shareholders approved the
peningkatan modal disetor sebanyak increase in the Company’s to 186,471,154
186.471.154 lembar. Modal disetor semula shares. Paid up capital from 9,727,504,205
9.727.504.205 atau setara dengan Rp shares or Rp 972,750,420,500 to
972.750.420.500 menjadi 9.913.975.359 atau 9,913,975,359 shares or
setara Rp 991.397.535.900. Perubahan Rp 991,397,535,900. This change has been
tersebut telah disahkan oleh Kementerian approved by Ministry of Law and Human
Hukum dan Hak Asasi Manusia No. AHU- Rights No. AHU-AH.01.03/0934821 dated
AH.01.03/0934821 tanggal 26 Mei 2015. May, 26, 2015. Based on the Deed No. 37
Berdasarkan Akta No. 37 tanggal 30 Juli 2015 from dated July 30, 2015 Notary Fathiah
dari Fathiah Helmi, S.H., Notaris di Jakarta, Helmi, S.H., Notary in Jakarta, there were
terdapat penambahan jumlah modal disetor increasing the number of paid-in capital as
sebanyak 3.653.498 lembar, semula much as 3,653,498 shares, paid up capital
9.913.975.360 atau setara from 9,913,975,360 or Rp 991,397,536,000
Rp 991.397.536.000 menjadi 13.567.473.559 become 13,567,473,559 or
atau setara dengan Rp 1.356.747.356.000 Rp 1,356,747,356,000. This change has been
Perubahan tersebut disahkan oleh approved by the Minister of Law and Human
Kementerian Hukum dan Hak Asasi Manusia Rights of Republic of Indonesia No. AHU-
Republik Indonesia No. AHU- 3536245.AH.01.11 dated July 30, 2015.
3536245.AH.01.11 tanggal 30 Juli 2015.

 Berdasarkan Akta Keputusan Rapat  Based on the Deed No. 6 of General


Pemegang Saham No. 6 tanggal 4 Pebruari Shareholders Meeting dated February 4, 2016
2016 dari Fathiah Helmi, S.H., Notaris di from Fathiah Helmi, S.H., Notary in Jakarta,
Jakarta, pemegang saham menyetujui the shareholders approved increase in the
penambahan jumlah modal disetor sebanyak Company’s paid-in capital of 5,019,750 shares,
5.019.750 lembar saham, semula from 13,567,473,559 shares (equal to
13.567.473.559 lembar saham atau setara Rp 1,356,747,356,000) to 13,572,493,310
Rp 1.356.747.356.000 menjadi shares (equal to Rp 1,357,249,331,000). This
13.572.493.310 lembar saham atau setara Rp change has been approved by the Minister of
1.357.249.331.000. Perubahan tersebut telah Law and Human Rights of the Republic of
disahkan oleh Kementerian Hukum dan Hak Indonesia in its decree No. AHU-0016611.
Asasi Manusia Republik Indonesia No. AHU- AH.01.03 dated February 5, 2016.
0016611-AH.01.03 tanggal 5 Pebruari 2016.

 Berdasarkan Akta Keputusan Rapat  Based on the Deed No. 50 of General


Pemegang Saham No. 50 tanggal Shareholders Meeting dated November 25,
25 Nopember 2016 dari Fathiah Helmi, S.H., 2016 from Fathiah Helmi, S.H., Notary in
Notaris di Jakarta, pemegang saham Jakarta, the shareholders approved increase in
menyetujui penambahan modal disetor the Company’s paid-in capital of 842,439
sebanyak 842.439 lembar saham, semula shares, from 13,572,493,310 shares (equal to
13.572.493.310 lembar saham atau setara Rp 1,357,249,331,000) to 13,573,335,750
dengan Rp 1.357.249.331.000 menjadi shares (equal to Rp 1,357,333,575,000). This
13.573.335.750 lembar saham atau setara change has been approved by the Minister of

126
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

dengan Rp 1.357.333.575.000. Perubahan Law and Human Rights of the Republic of


tersebut telah disahkan oleh Kementerian Indonesia in its decree No. AHU-AH.01.03-
Hukum dan Hak Asasi Manusia No. AHU-AH. 0102149 dated November 25, 2016.
01.03-0102149 tanggal 25 Nopember 2016.

 Anggaran Dasar Perusahaan telah beberapa  The Company's Articles of Association has
kali mengalami perubahan, terakhir been amended for several times, most recently
berdasarkan Akta Notaris No. 126 tanggal by the Notarial Deed No. 126 on March 31,
31 Maret 2017, yang dibuat dihadapan Jose 2017 of Jose Dima Satria, S.H., M.Kn, Notary
Dima Satria, S.H., M.Kn, Notaris di Jakarta, in Jakarta, concerning among other increase in
antara lain berkaitan dengan peningkatan the Company’s subscribed and paid up capital.
modal ditempatkan dan disetor Perusahaan. The amendment was approved by the Minister
Perubahan ini telah disetujui oleh Menteri of Law and Human Rights of Republic of
Hukum dan Hak Asasi Manusia Republik Indonesia in his decision letter No. AHU-
Indonesia dengan Surat Keputusan No. AHU- 0043583. AH.01.11 Year 2017 dated
0043583.AH.01.11 Tahun 2017 tanggal April 3, 2017.
3 April 2017.
 Penambahan modal saham sebanyak  Additional paid in capital of 373,700 shares or
373.700 lembar saham atau setara dengan equal to Rp 37,369,997 from excecution of
Rp 37.369.997 yang berasal dari eksekusi MESOP for the period November 2016 is still
MESOP periode bulan Nopember 2016 saat in process of deed amandement.
ini sedang dalam proses perubahan akta.

34. TAMBAHAN MODAL DISETOR 34. ADDITIONAL PAID-IN CAPITAL


30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp
Agio Saham Premium on Stock
Tambahan modal disetor dari penawaran umum saham Additional paid-in capital of a public offering
Perusahaan kepada masyarakat sebesar 3.082.315.000 of shares to the public at 3,082,315,000 shares
saham dengan nilai nominal Rp 100 per saham, yang with a nominal value of Rp 100 per share,
ditawarkan Rp 380 per saham 863,048,200,000 863,048,200,000 which offered Rp 380 per share
Tambahan modal disetor dari eksekusi opsi saham karyawan 118,826,375,828 118,826,375,828 Additional paid-in capital from the exercise of employee stock options
Tambahan modal disetor dari penawaran umum terbatas I (PUT I) Additional paid-in capital of a limited public offering (LOP I)
Perusahaan kepada masyarakat sebesar 3.653.498.200 saham dengan of shares to the public at 3,653,498,200 shares with
nilai nominal Rp 100 per saham, yang ditawarkan Rp 1.450 per saham 4,969,551,418,508 4,969,551,418,508 par value Rp 100 per share, offered Rp 1,450 per share
Dikurangi dengan biaya emisi saham (31,910,365,455) (31,910,365,455) Less: Share Issuance Cost
Dikurangi dengan biaya emisi saham penawaran umum terbatas (37,328,848,507) (37,328,848,507) Less: Share Issuance Cost on Limited Public Offering
Saldo Tambahan modal disetor 5,882,186,780,374 5,882,186,780,374 Total Paid In Capital

Penyesuaian atas Perubahan Kepemilikan Adjustment for Changes Ownership


atas Entitas Anak in Subsidiaries
- PT KKDM (297,505,040,409) -- - PT KKDM
- PT WBW (652,057,936) -- - PT WBW

Modal Disetor Lainnya Other Paid in Capital


Opsi Saham Stock Option
Saldo Awal 490,112,010 74,986,760 Beginning Balance
Penambahan 29,612,524 693,095,314 Additional
Eksekusi (Catatan 36) (6,444,124) (277,970,064) Execution (Note 36)
Jumlah 5,584,542,962,439 5,882,676,892,384 Total

Tambahan modal disetor - agio saham merupakan agio Additional paid in capital – premium on share
saham yang berasal dari penawaran umum saham represent share premium resulting from public
Perusahaan setelah dikurangi dengan biaya emisi offering by the Company net off share issuance
saham. cost.

Biaya emisi efek ekuitas merupakan biaya yang Share issuance cost are payment related to the
berkaitan dengan penerbitan efek ekuitas Perusahaan. issuance of Company’s equity securities. These
Biaya ini mencakup fee dan komisi yang dibayarkan costs include fees and commissions paid to the
kepada penjamin emisi, lembaga dan profesi underwriter, supporting institutions and
penunjang pasar modal, dan biaya pencetakan professionals in capital markets, and the registration
dokumen pernyataan pendaftaran, biaya pencatatan document printing costs, cost of equity securities
efek ekuitas dibursa efek, serta biaya promosi sesuai listing on the stock exchange, as well as
dengan Keputusan Ketua Badan Pasar Modal No. Kep- promotional cost in accordance with the Decision of

127
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

97/PM/1996 tanggal 28 Mei 1996 yang diubah dengan the Chairman of the Capital Market Board No. Kep-
Kep-06/PM/2000 tanggal 13 Maret 2000, peraturan 97/PM/1996 dated May 28, 1996 as amended by
No. VIII.G.7 tentang Pedoman Penyajian Laporan Kep-06/PM/2000 dated March 13, 2000, regulation
Keuangan Bab Ekuitas pasal Tambahan Modal Disetor. No. VIII.G.7 of Guidelines for the Preparation of
Biaya Emisi Efek Ekuitas berasal dari penawaran Financial Statements Chapter Equity article
perdana tahun 2012 sebesar Rp 31.910.365.455 dan Additional Paid-in Capital. Share issuance costs
penawaran umum terbatas I tahun 2015 sebesar derived from the initial public offering in 2012
Rp 37.328.848.507. amounted to Rp 31,910,365,455 and rights issues
year 2015 amounted to Rp 37,328,848,507.

Biaya emisi saham telah di audit oleh Akuntan Issuance costs have been audited by an
Independen Soejatna, Mulyana & Rekan tanggal Independent Accountant Soejatna, Mulyana &
5 Pebruari 2013 dengan laporan No. 007/SMR/LAI- Partners dated February 5, 2013 with report
VIPO/WK/II/2013. No. 007/SMR/LAI-VIPO/WK/II/2013.

35. OPSI SAHAM 35. STOCK OPTION

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Saldo Awal 490,112,010 74,986,760 Beginning Balance
Penambahan -- 693,095,314 Addition
Eksekusi (Catatan 35) (6,444,124) (277,970,064) Execution (Note 35)
Jumlah 483,667,886 490,112,010 Total

Program Opsi Kepemilikan Saham kepada Management and Employee Stock Option Plan
Manajemen dan Karyawan (MESOP) (MESOP) Program

Berdasarkan surat Menteri BUMN No. S-576/ MBU/2012 Based on the letter from Minister of SOE No. S-576
tanggal 23 Oktober 2012 mengenai persetujuan MBU/2012 dated October 23, 2012 related to
Penawaran Umum Perdana Saham (Initial Public approval for Initial Public Offering (IPO), it was
Offering/IPO), menyetujui IPO maksimum 30% dari agreed that IPO is for a maximum 30% of paid up
modal ditempatkan dan disetor penuh setelah IPO, capital after IPO, including plan for MESOP
termasuk program MESOP dari modal ditempatkan dan program within paid up capital after IPO.
disetor penuh setelah IPO.

Pernyataan persetujuan Menteri BUMN tersebut telah The Statement of consent from the Minister of SOE
diaktakan melalui akta notaris No. 57 tanggal 24 Oktober has been notarized through notarial deed No. 57
2012, notaris Fathiah Helmi SH, notaris di Jakarta dan dated October 24, 2012 by Fathiah Helmi SH,
telah didaftarkan untuk memperoleh pengesahan Notary in Jakarta and has been registered to get
kepada Menteri Hukum dan Hak Asasi Republik approval from the Minister of Law and Human
Indonesia dengan Surat Penerimaan Pemberitahuan Rights with its decre No. AHU 54929.AH.01.02 year
No. AHU-54929.AH.01.02 tahun 2012, tanggal 2012 dated October 24, 2012.
24 Oktober 2012.

Berdasarkan keputusan Direksi Perusahaan Based on the decision of the Directors of the
No. 023/SK/WK/2012 dan No. 08/SK/WK/PEN/2013, Company No. 023/SK/WK/2012 and
Direksi memutuskan tentang program MESOP. No. 08/SK/WK/PEN/2013, the Board of Directors
manajemen dan pegawai Perusahaan yang berhak decided on MESOP program for management and
untuk mengikuti program MESOP terdiri dari: employees of the Company. Management and
employees who are eligible to participate MESOP
program consists of:
a. Komisaris Perusahaan (tidak termasuk Komisaris a. The Commissioner of the Company (not
Independen) including the Independent Commissioner)
b. Direksi Perusahaan b. The Directors of the Company
c. Pegawai Tetap (PT) c. Permanent employees (PT)
d. Pegawai Tetap Unit Kerja/ Unit Bisnis (PTU) d. Permanent employees Unit/ Business Unit
(PTU)
e. Pegawai Tidak Tetap e. Non Permanent employees
Pelaksanaan program MESOP akan dilakukan dengan MESOP program implementation will be done by
menerbitkan hak opsi dalam 2 (dua) tahap dengan issuing option rights in 2 (two) phases with the
rincian sebagai berikut: detail are as follows:

128
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

MESOP Tahap I MESOP Phase I


Jumlah saham yang akan diterbitkan pada tahap I The total shares to be issued in phase I is 60%
sebesar 60% (enam puluh persen) dari jumlah hak opsi (sixty percent) of the number of option rights issued
yang diterbitkan dalam program MESOP atau sebesar in MESOP program, or amounted to 173,380,0000
173.380.000 saham seri B. Harga eksekusi sebesar shares of B Serie. The exercise price amounted to
Rp 438, dengan periode eksekusi setiap bulan Mei dan Rp 438, with the period of exercises of each May
Nopember dengan umur opsi selama 5 tahun, dihitung and November with 5 years option period, starting
dari tanggal pendistribusian 21 Januari 2013 sampai from the distribution date January 21, 2013 until
dengan 20 Januari 2018. Opsi saham mempunyai masa January 20, 2018. Stock option has vesting period
tunggu (vesting period) selama satu tahun sejak for one year starting January 21, 2013 will be
21 Januari 2013 yang berakhir pada tanggal 20 Januari ended on January 20, 2014.
2014.

Nilai wajar dari MESOP diestimasi dengan Fair value of MESOP is estimated with using
menggunakan model penentuan harga opsi Binominal Binominal Lattice model, according to valuated
Lattice, sesuai dengan laporan penilaian KJPP Yanuar report by KJPP Yanuar BEY and Partner, dated
BEY dan Rekan, tanggal 30 April 2013, dengan asumsi- April 30, 2013, with the assumptions as follows:
asumsi sebagai berikut:

MESOP 1 Tahap I/ MESOP 1 Tahap II/


Phase I Phase II

Suku Bunga Bebas Risiko 4,71% 6,80% Risk Free Rate


Ekspektasi Periode Opsi (Tahun) 5 5 Expected Term of Option (Year)
Ekspektasi Faktor Ketidakstabilan Harga Saham 50,99% 46,00% Expected Volatility of Share Price
Ekspektasi Dividen yang Dihasilkan 3,48% 1,20% Expected Dividend Yield

Sesuai dengan surat Perusahaan No. 177/WK/DIR/2013 Based on the Company's letter
tanggal 22 Pebruari 2013 kepada BEI, Perusahaan No.177/WK/DIR/2013 dated February 22, 2013 to
menyampaikan rencana pelaksanaan program MESOP the IDX, the Company submitted an implementation
Perusahaan untuk Opsi Tahap I sejumlah 173.380.000 plan MESOP program of the Company for Phase I
saham Seri B dengan umur 5 (lima) tahun sejak tanggal Option number 173,380,000 shares of Series B
penerbitan dan terkena vesting period yakni 1 (satu) with the age of 5 (five) years from the date of
tahun terhitung sejak tanggal penerbitannya. Harga issuance and exposed to the vesting of 1 (one)
pelaksanaan untuk Tahap I sebesar Rp 438 (empat year from the date of publication. The exercise
ratus tiga puluh delapan) per saham mengacu pada price for Phase I of Rp 438 (four hundred and thirty-
harga rata-rata perdagangan saham Perusahaan di BEI eight) per share refers to the average trading price
pada penutupan perdagangan tanggal 17 Januari 2013 of shares on the Company share trading in IDX at
sampai dengan tanggal 21 Pebruari 2013. the close of trading on January 17, 2013 until the
date of February 21, 2013.

Berdasarkan surat No. S-0470/BEI.PPJ/02-2013 tanggal Based on letter No. S-0470/BEI.PPJ/02-2013 dated
26 Pebruari 2013, BEI menyetujui pencatatan saham di February 26, 2013, IDX approved the listing of
BEI yang berasal dari program MESOP sejumlah shares on the IDX from MESOP program amounted
173.380.000 saham Seri B. to 173,380,000 shares of B Series.

MESOP Tahap II MESOP Phase II

Jumlah saham yang diterbitkan tahap II sebesar 40% The total shares to be issued in phase II is 40%
(empat puluh persen) dari jumlah hak opsi yang (forty percent) of the number of option rights issued
diterbitkan dalam program MESOP atau sebesar in MESOP program, or amounted to 115,587,000
115.587.000 saham Seri B. Harga eksekusi sebesar Rp shares of B Serie. The exercise price amounted to
396, dengan periode eksekusi setiap bulan Maret dan Rp 396, with the period of exercises of each May
Nopember dengan umur opsi selama 5 tahun, dihitung and November with 5 years option period, starting
dari tanggal pendistribusian 21 Januari 2014 sampai from the distribution date on January 21, 2014 until
dengan 20 Januari 2019. Opsi saham mempunyai masa January 20, 2019. Stock option has vesting period
tunggu (vesting period) selama satu tahun sejak 21 for one year starting January 21, 2014 will be
Januari 2014 yang berakhir pada tanggal 20 Januari ended on January 20, 2015.
2015.

129
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Nilai wajar dari MESOP diestimasi dengan Fair value of MESOP is estimated with using
menggunakan model penentuan harga opsi Binominal Binominal Lattice model, according to valuated
Lattice, sesuai dengan laporan penilaian KJPP Yanuar report by KJPP Yanuar BEY and Partner, dated
BEY dan Rekan, tanggal 1 Juli 2014. July 1, 2014.

Berdasarkan surat No. S.00091/BEI.PPJ/01-2014 Based on letter No. S.00091/BEI.PPJ/01-2014


tanggal 8 Januari 2014, BEI menyetujui pencatatan dated January 8, 2014, IDX approved the listing of
saham di BEI yang berasal dari program MESOP shares on the IDX from MESOP program amounted
sejumlah 115.587.000 saham seri B. to 115,587,000 of B series shares.

Mutasi opsi saham per 30 Juni 2017 sebagai berikut: Mutation of stock option as of June 30, 2017 as
follows:
30 Juni/ June 30, 2017
Mesop Tahap I/ Phase I
Rata-rata Tertimbang
Harga Eksekusi/
Jumlah Opsi/ Weighted Average
Total Option Execution Price
Lembar Rp
Opsi Beredar Outstanding Option
Awal Tahun 647,500 438 Beginning of the Year
Opsi yang Dieksekusi Option Executed
Selama Periode Berjalan (34,000) 438 during the period
Opsi yang telah Lewat
Masa Berlakunya -- 438 The Expired option
Sisa Opsi yang Bisa Dieksekusi 613,500 438 Option can be Executed

30 Juni/ June 30, 2017


Mesop Tahap II/ Phase II
Jumlah Opsi/ Rata-rata Tertimbang
Total Option Harga Eksekusi/
Weighted Average
Execution Price
Lembar Rp
Opsi Beredar Outstanding Option
Awal Tahun 399,250 396 Beginning of the Year
Opsi yang Dieksekusi Option Executed
Selama Periode Berjalan (20,900) 396 during the period
Opsi yang telah Lewat The Expired option
Masa Berlakunya -- 396
Sisa Opsi yang Bisa Dieksekusi 378,350 396 Option can be Executed

36. SALDO LABA 36. RETAINED EARNINGS

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Telah Ditentukan Penggunaannya Appropriated
Saldo Awal 578,285,992,592 368,738,372,808 Beginning Balance
Penambahan Dana Cadangan 469,327,983,689 209,547,619,784 Addition on Reserved Fund
Saldo Akhir 1,047,613,976,281 578,285,992,592 Ending Balance

Belum Ditentukan Penggunaannya Unappropiated


Saldo Awal Tahun 2,755,875,621,660 1,435,901,518,452 Beginning Balance
Dividen (513,978,185,018) (209,547,624,362) Dividend
Dana Program Kemitraan dan Partnership Program and
Bina Lingkungan -- 20,951,161,705 Community Development Funds
Pembentukan Cadangan Umum (469,327,983,689) (209,547,619,784) Allocation to General Reserve
Laba Bersih 1,281,933,282,188 1,713,260,616,725 Net Income
Pengukuran Kembali Program Remeasurement of Defined
Imbalan Pasti (5,461,602,419) 4,857,568,924 Benefit Plans
Saldo Akhir Tahun 3,049,041,132,722 2,755,875,621,660 Ending Balance

130
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Berdasarkan Risalah Umum Pemegang Saham Based on the Minutes of the Annual General
Tahunan (RUPST) tanggal 17 Maret 2017, pemegang Meeting of Shareholders (AGM) dated March 17,
saham menyetujui untuk membentuk cadangan umum 2017, shareholders approved to provide general
atas penggunaan laba perusahaan tahun 2016 reserve from the Company's profits in 2016
sebesar Rp 342.652.123.345, pembagian dividen tunai amounted to Rp 342,652,123,345, distribution of
sebesar Rp 513.978.185.018 dan dana untuk PKBL cash dividend amounted to Rp 513,978,185,018
tahun 2017 dihitung maksimal 2% dari laba bersih and the fund of CSR in 2017 calculated maximum
tahun buku 2016 dan menjadi beban ditahun berjalan. 2% of the net profit fiscal year 2016 and become
expenses in current year.

Berdasarkan Risalah Rapat Umum Pemegang Saham Based on the minutes of the Annual General
Tahunan (RUPST) tanggal 29 Maret 2016, pemegang Meeting of Shareholders (AGM) dated March 29,
saham menyetujui untuk membentuk cadangan umum 2016, shareholders approved to provide general
atas penggunaan laba perusahaan tahun 2015 reserve from the Company's profits in 2015
sebesar Rp 209.547.624.362, pembagian dividen tunai amounted to Rp 209,547,624,362, distribution of
sebesar Rp 209.547.624.362 dan dana untuk PKBL cash dividend amounted to Rp 209,547,624,362
tahun 2016 dihitung maksimal 2% dari laba bersih and the fund of CSR in 2016 calculated maximum
tahun buku 2015 dan menjadi beban ditahun berjalan. 2% of the net profit fiscal year 2015 and become
expenses in current year.

Perusahaan membuat penyisihan untuk cadangan The Company provided appropriation to general
umum sesuai dengan UU No. 40 tahun 2007 mengenai reserve in accordance with the Law No. 40 year
Perusahaan Terbatas. UU tersebut mengharuskan 2007 concerning to Limited Company. The law
perusahaan di Indonesia untuk membuat penyisihan requires companies in Indonesia to provide a
cadangan umum sekurang-kurangnya 20% dari jumlah general reserve at least 20% of the issued and
modal yang ditempatkan dan disetor penuh. Dana fully paid capital. Reserve funds should be
cadangan diadakan untuk menutupi kerugian yang maintained to cover suffered losses and can be
diderita dan dapat dipergunakan sebagai modal kerja used as working capital and other purposes by the
dan tujuan lain menurut keputusan RUPS. decision of the AGM.

37. PENDAPATAN USAHA 37. REVENUES

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp

Jasa Konstruksi 15,049,676,154,902 7,684,449,930,844 Construction Services


Penjualan Precast 251,047,515,282 334,949,210,340 Sales Precast
Pendapatan Jalan Tol 152,226,909,870 64,672,908,370 Toll Road Revenue
Pendapatan Property 16,316,355,040 -- Property Revenue
Pendapatan Hotel 51,324,782,467 -- Hotel Revenue
Energi 22,565,867,445 -- Energy
Sewa Gedung dan Peralatan 4,910,553,592 501,780,577 Buildings and Equipment Rental
Jumlah 15,548,068,138,598 8,084,573,830,131 Total

Rincian pendapatan usaha adalah sebagai berikut: The details of the revenues are as follows:
30 Juni 2017/ 30 Juni 2016/
June 30, 2017 June 30, 2016
Pihak Berelasi/ Related Parties
PT PAL Indonesia (Persero) 50,692,428,172 74,424,979,035
PT Jasamarga Semarang Batang 1,185,532,235,423 --
PT Hutama Karya (Persero) 1,669,437,043,035 117,745,369,727
PT Solo Ngawi Jaya 637,868,305,986 642,018,090,718
PT Ngawi Kertosono Jaya 424,726,759,195 207,408,933,416
PT Kereta Api Indonesia (Persero) -- --
PT Perusahaan Listrik Negara (Persero) 455,327,325,397 630,108,554,720
PT Jasamarga Kualanamu Tol 81,868,795,364 507,337,822,082
PT Kresna Kusuma Dyandra Marga -- 413,775,504,761
PT Prima Multi Terminal (Pelindo) 131,072,309,365 121,560,000,000
PT Semen Padang (Persero) 320,183,174
PT Dahana (Persero) 7,251,057,270
PT Jasamarga Jalan layang Cikampek 396,270,004,524
Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion ) 769,433,037,141 295,612,827,034
Sub Jumlah/ Sub Total 5,809,799,484,046 3,009,992,081,493

131
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Pihak Ketiga/ Third Parties
Kementerian Perhubungan/ Ministry of Transportation 1,908,937,128,427 1,440,199,303,445
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
Ministry of Public Works and Housing 1,274,311,341,695 614,177,349,461
The Ministry of Public Work of Republica Democratia De Timor Leste 20,800,522,766 119,330,537,832
Bandar Udara Jawa Barat/ The International Airport of West Java 138,021,236,364 --
Pemerintah Daerah/ District Governments 132,339,895,615 423,406,274,961
Perpustakaan Nasional RI -- 81,823,890,634
Badan Nasional Penanggulangan Bencana RI -- 72,846,155,670
PT Menara Pelangi 3,527,640,472 54,909,945,000
BPJT - PT Pejagan Pemalang Tol Road 1,073,942,565,342 577,142,853,951
BPJT - PT Cimanggis Cibitung Tollways 163,209,545,258 361,244,754,252
BPJT - PT Trans Jabar Tol 337,579,461,549 --
BPJT - PT Sriwijaya Markmore Persada 906,297,888,684 49,009,532,455
BPJT - PT Pemalang Batang Toll Road 755,222,479,334 --
BPJT - PT Waskita Bumi Wira 1,431,093,674,755 --
BPJT - PT Trans Jawa Paspro Jalan Tol 467,838,420,374 --
PT Toba Pengembang Sejahtera 257,000,655,911 111,598,193,351
Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion ) 79,909,674,485
7088237E+11 1,168,892,957,626
Sub Jumlah/ Sub Total 9,738,268,654,552 5,074,581,748,638
Jumlah/ Total 15,548,068,138,598 8,084,573,830,131

Rincian pemberi kerja dengan nilai kontribusi Details of the project owners with contribution
pendapatan melebihi 10% dari pendapatan usaha value exceding 10% of the Company revenues for
Perusahaan untuk tanggal 30 Juni 2017 dan June 30, 2017 and December 31, 2016 are as
31 Desember 2016 sebagai berikut: follows:

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp
BPJT 5,135,184,035,296 987,397,140,658
Kementerian Perhubungan/ Ministry of Transportation 1,908,937,128,427 --
PT Hutama Karya (Persero) 1,669,437,043,035 --
Jumlah/ Total 8,713,558,206,758 987,397,140,658

38. BEBAN POKOK PENDAPATAN 38. COST OF REVENUES


30 Juni 2017/ 30 Juni 2016/
June 30, 2017 June 30, 2016
Rp Rp
Jasa Konstruksi Construction Services
Subkontraktor 6,346,836,475,442 1,333,178,373,563 Subcontractor
Beban Tidak Langsung 2,682,646,749,129 2,256,664,759,856 Indirect Costs
Bahan Baku 2,685,617,355,599 2,099,103,507,471 Raw Material
Upah 833,947,988,805 624,093,310,799 Wages
Jumlah Jasa Konstruksi 12,549,048,568,975 6,313,039,951,689 Total Constructions Services

Jalan Tol 56,351,991,647 37,013,730,885 Toll Roads

Properti dan Hotel 57,768,460,705 -- Property and Hotel

Energi 8,173,935,735 -- Energy


Produk Beton Concrete Products
Persediaan Awal 231,947,161,468 54,551,293,293 Beginning Balance
Pembelian 314,757,823,143 318,068,248,525 Purchases
Barang tersedia untuk Dijual 546,737,793,297 372,619,541,818 Goods Available for Sale
Persediaan Akhir 373,851,906,108 218,425,715,641 Ending Balance
Beban Bahan Baku 172,885,887,189 154,193,826,177 Raw Material Expenses
Beban Upah 1,364,286,882 10,471,002,730 Direct Labour Expenses
Beban Overhead 12,802,865,561 80,495,448,441 Overhead Expenses
Jumlah Produk Beton 187,053,039,632 245,160,277,348 Total Concrete Products
Jumlah Beban Pokok Pendapatan 12,858,395,996,694 6,595,213,959,922 Total Cost of Revenues

132
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

39. BEBAN PENJUALAN DAN BEBAN UMUM DAN 39. SELLING EXPENSES AND GENERAL AND
ADMINISTRASI ADMINISTRATIVE EXPENSES

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp
Beban Penjualan Selling Expenses
Pemasaran 8,028,518,981 10,123,330,508 Marketing
Tender 5,814,381,802 5,862,261,680 Tender
Iklan 1,588,768,703 512,565,853 Advertising
Jumlah 15,431,669,486 16,498,158,041 Total

Beban Umum dan General and


Administrasi -- Administrative Expenses
Pegawai 150,380,124,947 104,054,719,573 Employee
Penyusutan (Catatan 16) 35,235,810,583 21,750,741,292 Depreciation (Note 16)
Pesangon 34,075,263,722 19,238,886,214 Severance
Umum 46,075,955,717 34,554,723,951 General
Perjalanan Dinas 18,307,610,387 14,148,712,886 Travelling
Kantor 15,910,550,865 10,500,765,840 Office
Gedung 18,962,276,856 6,897,212,400 Building
Jamsostek 6,976,068,082 3,140,632,026 Jamsostek
DPLK 87,960,399 117,701,260 DPLK
Bonus/THR 16,434,446,352 12,593,488,519 Bonus/ THR Allowance
Lain-lain 28,127,767,564 338,412,862 Others
Jumlah 370,573,835,475 227,335,996,823 Total

40. PENDAPATAN LAIN-LAIN 40. OTHER INCOME

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp

Pendapatan atas Bunga Pinjaman 119,178,177,311 -- Income from Borrowing Interest


Pemulihan Piutang 4,594,400,004 230,000,000 Recovery of Receivables
Klaim Asuransi 3,132,895,279 219,577,722 Insurance Claims
Pendapatan Lain-lain KSO 414,692,962 1,970,898,194 Others JO Income
Pendapatan Lain-lain Proyek 15,007,313,211 20,085,640,677 Others Project Income
Lain-lain 89,504,054,065 638,669,461 Others
Jumlah 231,831,532,832 23,144,786,054 Total

41. BEBAN LAIN-LAIN 41. OTHER EXPENSES

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp

Beban dan Denda Pajak 23,532,065,859 374,828,311 Tax Expenses and Penalty
Beban Lain - lain KSO 17,140,694,736 8,364,951,985 Other Project Expenses
Beban Lain - lain Proyek 3,788,103,434 -- Others JO Expenses
Lain - lain 107,527,428,205 5,878,609,328 Others
Jumlah 151,988,292,234 14,618,389,624 Total

133
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

42. BEBAN KEUANGAN 42. FINANCIAL CHARGES

Akun ini merupakan beban bunga atas utang bank/ This account represents interest expenses on bank
non-bank, beban provisi, dan beban administrasi bank loans/ non-banks, provision fees, and
yang terkait dengan perolehan pinjaman selama administrative expenses related to the acquisition
periode berjalan setelah dikurangi biaya bunga yang of bank loans during the current period after
secara langsung dapat diatribusikan dengan biaya deducting the interest costs which are directly
perolehan suatu proyek tertentu yang memenuhi syarat attributable to the cost of a qualifying project and
dan beban bunga atas utang obligasi Perusahaan. the interest expense on debt Corporate bonds.

43. BAGIAN LABA (RUGI) BERSIH ENTITAS ASOSIASI 43. EQUITY IN NET INCOME (LOSS) OF
DAN VENTURA BERSAMA ASSOCIATES AND JOINT VENTURES

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp

Bagian Laba (Rugi) Bersih Ventura Equity in Net Income (Loss) of


Bersama Konstruksi (Catatan 13) 26,408,877,163 (7,752,120,546) Construction Joint Ventures (Note 13)
Bagian Laba Entitas Asosiasi (Catatan 13) -- -- Associates Entities (Note 13)

Jumlah 26,408,877,163 (7,752,120,546) Total

Kemitraan/ Nama Proyek/ 30 Juni 2017/ 30 Juni 2016/


Venturer Projects Name June 30, 2017 June 30, 2016
Pihak Berelasi/ Related Parties Rp Rp
Waskita - HK Normalisasi Kali Ciliwung 1,129,911,799 2,086,361,161
Waskita - NK Jalan Batu Aji Kuaro 9,902,220,526 7,809,387,767
Waskita - Wika Jalan Tol Ciawi Sukabumi seksi 1 -- 2,092,169,763
Waskita - Adhi Pengaman Pantai Jakarta Tahap 2 Paket 1 4,183,624,417 2,272,221,131
Waskita - Penta Lansekap Bandara Soetta 3,103,974,792 3,574,476,903
Waskita - HK - Wika Bandara Samarinda 77,662,479 4,500,319,711
Waskita - Yodya Karya Bandara Husein 307,755,522
Waskita - Brantas Bandara Husein -- 1,470,265,165
Waskita - Brantas - Wika Bendung Gerak Sembayat 6,827,702,071 3,339,029,902
Waskita - Hutama Manado - Bitung (Air Madidi) 386,797,549 1,901,850,099
Waskita - PP Bendung Batang Sinamar 491,127,688 2,098,376,937
Waskita - BAP Bendungan Tapin 6,012,171,460 (4,388,299,909)
Waskita - PP Kamijoro (2,202,134,384) --
Waskita - Adhi Bendungan Way Sekampung (Paket 2) 2,729,988,978 --
Waskita - Adhi Bendungan Leuwi Keris Paket 2 369,005,456 --
Waskita - Citra Mandiri Lakitan 1,552,513,725 --
Waskita - Taruna Putra Pertiwi DI Colo 1,402,940,171 --
Waskita - Wika Aksesibilitas Ducting Utility 1,511,670,181 11,027,736,139
Waskita - Wika - Nindya Soker MYC 3,107,052,575 3,409,324,335
Waskita - PP BPK RI -- 1,442,661
Waskita - Wika Run Way SSK II -- 44,317,486
Waskita - PP - HK Jalan Tol Depok-Antasari (Desari) -- 69,809,851
Waskita - HK Sal Induk Siderejo 2,064,301,670 (209,382,058)
Waskita - Brantas Civil Work of Jabung -- (1,434,341,668)
Waskita - PP - Wika Suramadu CIC -- (2,598,000,000)
Waskita - PP - Wika Jembatan Merah Putih (11,400,000,000) (30,145,073,950)
Waskita - Wika Jalan Tol Seksi-1 Ciawi-Cigombong/Lido 14,837,902,165
Waskita - Jasamarga Jalan Layang Cikampek
Jalan Layang Cikampek (4,327,189,853)
Waskita - HK Jalan Bantaeng - Buluklumba -- (718,659)
Sub Jumlah/ Sub Total 42,068,998,987 6,921,272,767

134
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Kemitraan/ Nama Proyek/ 30 Juni 2017/ 30 Juni 2016/


Venturer Projects Name June 30, 2017 June 30, 2016
Rp Rp
Pihak Ketiga/ Third Parties
Waskita - Kajima E2 Cilincing - Jampea (43,558,948,977) (7,100,000,000)
Waskita - Gorip Nanda Guna Jl. Gempor Paket 2 Porong-Kejapan 715,970,328 --
WKR - RNI RNI Office Park (912,957) --
Waskita - Arkonin Renov. Bandara Ngurah Rai (37,879) (270,155,116)
WKR - Asiana Virro Senopati 6,573,609,077 5,364,123
WKR - Ekatama Apartemen Pejaten 3,054,292 --
Waskita - Yasa Bandara Kualanamu (9,745,139,982) 2,366,209,255
Waskita - Triniti Apartemen Brooklyn Alam Sutra 126,049,675 5,625,580,215
Waskita - Wika - PP - Jaya Gd. Terminal 3 18,955,958 235,272,777
Waskita - Wika - IPA Karian Multipurpose Dam Project 2,589,958,690 1,139,278,096
Waskita - Abdi Mulia Berkah Sal Primer Jabung II 1,132,803,631 1,499,516,662
Waskita - Bawakaraeng Irigasi D.I. Batang Alay 2,028,235,015 5,271,404,058
Waskita - Cempaka Bendung Baliase 3,030,507,617 2,350,819,502
WKR - Darmo Permai Segi 88 Avenue 2,145,929,810 1,532,873,352
Waskita - Yasa Jl. Galing Aruk 8,776,627,368 7,050,337,668
WKR - Sirius Yukata Suites 2,646,329,046 100,862,913
Waskita - Surya Bakti Jalan Pendekat Mahakam IV Sisi Samarinda Kota (MYC) 6,414,974,944 --
Waskita - Basuki Rahmana Putra Dredging & Embankmen -- 8,466,273,817
Waskita - Wika - Shanghai Jalan Tol Cisumdawu (2,620,514,232) --
Waskita - Metallungical - Wika - NK Jalan Tol Cisumdawu Phase 2 514,433,445 (1,481,011,747)
Waskita - Wika - IPA Dermaga Semarang -- 170,112,629
Waskita - JPC SMM Muara Teweh Div.Sipil -- 55,551
Waskita - ZUG PLTU Rote -- (71,100,684)
WKR - Dalawa Zallaka - Batu Tumpeng 3,622,836,621 (21,586,491)
Waskita - Brantas Terminal Selatan Bandara Djuanda (Thp 2) -- (22,899,983)
Waskita - Ricky Kencana Underpass Simpang Patai - Pusri -- (343,291,893)
Waskita - Sinar Intan PDAM Tanah Grogot -- (135,486,536)
Waskita - Feberco PLN Curup (74,843,314) (1,048,008,022)
Waskita - Daya Mulia Turangga Spam Samarinda Utara -- (1,712,876,319)
Waskita - Daya Mulia Turangga Ipuh Bantal Roads -- (7,020,550,825)
Waskita - Andesmont Jalan Kebayan - Simpang Kraft -- (7,687,233,168)
Waskita - PAL PLTU Malinau -- (23,573,153,147)
WBP - Jakon Normalisasi Turap Pasar Lama -- --
Sub Jumlah/ Sub Total (15,660,121,824) (14,673,393,313)
Jumlah/ Total 26,408,877,163 (7,752,120,546)

44. KEPENTINGAN NON-PENGENDALI 44. NON-CONTROLLING INTEREST


30 Juni/ June, 2017
Bagian Laba (Rugi) Penambahan
Nilai Awal/ Tahun Berjalan/ (Pengurangan)/ Nilai Akhir/
Kepemilikan/ Beginning Profit (Loss) Additional Ending
Ownership Balance Current Year (Deduction) Balance
% Rp Rp Rp Rp

PT Bukaka Mega Investama (Untuk/ for TJT) 10% 153,701,404 (153,701,404) -- --


PT Jasa Sarana (Untuk/ for TJT) 8% (153,701,404) 153,701,404 -- --
PT Bukaka Mega Investama (Untuk/ for TPJT) 20% 46,583,250,871 (44,822,632,785) (1,760,618,086) --
PT Bukaka Mega Investama (Untuk / for SMR) 22.30% 29,101,868,165 (27,173,015,820) (1,928,852,345) --
PT Persada Tanjung Api-api (Untuk/ for PT Srimp) 30% 128,308,472,355 (128,308,472,355) -- --
PT Sriwijaya Marga Persada (Untuk/ for PT Srimp) 4% 17,107,796,314 (17,107,796,314) -- --
Kayson Company (Untuk/ for PT Srimp) 5% 21,384,745,392 (21,384,745,392) -- --
Koperasi Waskita (Untuk/ for PT WTR) 0,001% 3,938 533,999 (57) 537,880
Koperasi Waskita (Untuk/ for PT WTR) 0,001% 1,000,000 1,803,694,861 (1,803,694,864) 999,997
Koperasi Waskita (Untuk/ for PT WKR) 0,001% 997,464 -- 11,302 1,008,766
Koperasi Waskita (Untuk/ for PT WKE) 0,001% 535,927 1,000,000 (90,068) 1,445,859
Koperasi Waskita (Untuk/ for PT WTTR) 0,001% 956,978 581,074 (57) 1,537,995
Koperasi Waskita (Untuk/ for PT WBP) 0,001% 2,119,069 -- 230,635 2,349,704
PT Panca Wira Usaha 20% -- 2,838,336,181 11,512,275 2,849,848,456
PT Energi Bumi Mining (Untuk/ for PT WBW) 25% -- 3,547,920,226 14,390,343 3,562,310,569
Perusahaan Daerah Prodexim (Untuk/ for PT Srimp) 1% 4,276,949,079 (81,984,229) 10,142,140 4,205,106,990
PT Bakrie and Brothers Tbk (Untuk/ for PT CCT) 5% 4,583,669,249 50,989,764 (262,750,567) 4,371,908,446
PT Bakrie Toll Indonesia (Untuk/ for PT CCT) 5% 4,583,669,249 50,989,764 (262,750,567) 4,371,908,446
PT Jasa Marga (Persero) Tbk (Untuk/ for PT KKDMCTP) -- 4,840,635,040 2,877,796 4,843,512,836
PT Shalawat Power (Untuk/ for PT WSE) 15% 4,960,378,620 -- 126,293,770 5,086,672,390
PT Taspen (Untuk/ for PT WTR) 14,061% 91,969,065,860 (668,097,258) 91,300,968,602
PT Sumber Mitra Jaya (Untuk/ for PT PBTR) 40% 262,371,421,600 4,293,200,000 100,359,307 266,764,980,907
PT Sarana Multi Infrastruktur (Untuk/ for PT WTR) 12,076% -- 1,745,818,890,156 (18,403,472,358) 1,727,415,417,798
PT Akses Pelabuhan Indonesia (Untuk/ for PT CTP) 17% -- 1,999,762,522,434 (24,533,039,797) 1,975,229,482,637
Masyarakat Umum (Untuk/ for PT WBP) 40% 5,180,397,473,565 (126,955,502,297) 193,606,727,900 5,247,048,699,168
Jumlah/ Total 5,703,665,307,835 3,489,144,210,167 144,249,179,444 9,337,058,697,446

135
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

45. LABA PER SAHAM 45. EARNING PER SHARE


Berikut ini adalah data yang digunakan untuk Following the details of the calculation of basic
perhitungan laba per saham dasar: earning per share:
30 Juni 2017/ 30 Juni 2016/
June 30, 2017 June 30, 2016
Rp Rp
Net Income Attributable
Laba Bersih 1,281,933,282,188 582,233,351,380 to Parent Entity

Jumlah Saham Awal Periode 13,573,709,450 11,616,466,357 Beginning Balance of Shares


Tambahan Saham Beredar dari (Weighted Average) Additional Number
Program Mesop (Rata-rata) -- 110,921 of Shares from Mesop Program
Jumlah Rata - rata Bertimbang Saham 13,573,709,450 11,616,577,278 Weighted Average of Shares

Laba Per Saham Dasar 90.44 50.12 Basic Earning Per Shares

46. BANK GARANSI DAN LETTER OF CREDIT 46. BANK GUARANTEE AND LETTER OF CREDIT

Perusahaan memiliki fasilitas bank garansi dari The Company obtained bank guarantees facilities
PT Bank Negara Indonesia (Persero) Tbk, PT Bank from PT Bank Negara Indonesia (Persero) Tbk,
Mandiri (Persero) Tbk, PT Bank Rakyat Indonesia PT Bank Mandiri (Persero) Tbk, PT Bank Rakyat
(Persero) Tbk dan Indonesia Eximbank masing-masing Indonesia (Persero) Tbk and Indonesia Eximbank
dengan jumlah maksimum Rp 3.219.689.344.799, with maximum amount of Rp 3,219,689,344,799,
Rp 3.000.000.000.000, Rp 4.500.000.000.000 dan Rp 3,000,000,000,000, Rp 4,500,000,000,00 and
Rp 500.000.000.000. Rp 500,000,000,000, respectively.

Pada tanggal 30 Juni 2017 dan 31 Desember 2016, As of June 30, 2017 and December 31, 2016
Perusahaan telah menggunakan bank garansi sebagai the Company had used related bank guarantees
berikut: as follow:
30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp
PT Bank Negara Indonesia (Persero) Tbk 1,912,006,792,472 2,877,718,606,966
PT Bank Rakyat Indonesia (Persero) Tbk 3,143,708,676,113 2,011,546,101,781
PT Bank Mandiri (Persero) Tbk 2,150,978,134,449 1,296,707,568,697
Indonesia Eximbank 220,628,000,869 --
Jumlah/ Total 7,427,321,603,903 3,308,253,670,478

Perusahaan memiliki fasilitas bank garansi dari The Company obtained bank guarantees facilities
PT Bank Negara Indonesia (Persero) Tbk, PT Bank from PT Bank Negara Indonesia (Persero) Tbk,
Rakyat Indonesia (Persero) Tbk dan Bank of Tokyo- PT Bank Rakyat Indonesia (Persero) Tbk and
Mitsubishi UFJ, Ltd. masing-masing dengan jumlah Bank of Tokyo-Mitsubishi UFJ, Ltd. with maximum
maksimum Rp 100.000.000.000, Rp 100.000.000.000 amount of Rp 100,000,000,000,
dan Rp 300.000.000.000. Rp 100,000,000,000 and Rp 300,000,000,000,
respectively.

Perusahaan juga memiliki fasilitas L/C dan SKBDN The Company also obtained L/C and SKBDN
yang telah digunakan sebagai berikut: facilities with the total usage as follow:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
PT Bank Negara Indonesia (Persero) Tbk 23,615,252,063 6,128,385,101
PT Bank Rakyat Indonesia (Persero) Tbk 8,251,677,773 60,643,202,455
Bank of Tokyo Mitsubishi UFJ, Ltd. 175,440,791,218 60,643,202,455
Jumlah/ Total 207,307,721,054 127,414,790,011

136
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

47. FASILITAS KREDIT MODAL KERJA (KMK) DAN 47. WORKING CAPITAL LOANS FACILITY (WCL)
SUPPLY CHAIN FINANCING (SCF) AND SUPPLY CHAIN FINANCING (SCF)

Perusahaan dan entitas anak memiliki fasilitas KMK The Company and a subsidiary obtained WCL and
dan SCF yang digunakan untuk membayar tagihan SCF facilities were used to pay working partners’
mitra kerja sebagai berikut: bill as follow:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
PT Bank Negara Indonesia (Persero) Tbk - OAF 1,425,000,000,000 1,875,000,000,000
PT Bank Rakyat Indonesia (Persero) Tbk - BPF 1,200,000,000,000 1,200,000,000,000
PT Bank Mandiri (Persero) Tbk - SCF 2,406,000,000,000 1,006,000,000,000
PT Bank Negara Indonesia Syariah (Persero) Tbk - SCF 400,000,000,000 400,000,000,000
The Bank of Tokyo Mitsubishi UFJ 124,233,724,973 --
PT Bank UOB Indonesia 500,000,000,000 --
The Hongkong Shanghai Banking Corp 650,000,000,000 --
Jumlah/ Total 6,705,233,724,973 4,481,000,000,000

Pada tanggal 30 Juni 2017 dan 31 Desember 2016, As of June 30, 2017 and December 31 2016,
jumlah penggunaan fasiltas tersebut sebagai berikut: the total amounts of facility utilized, were as follow:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
PT Bank Negara Indonesia (Persero) Tbk - OAF 1,282,368,638,542 839,418,132,782
PT Bank Rakyat Indonesia (Persero) Tbk - BPF 1,187,333,657,192 897,121,450,519
PT Bank Mandiri (Persero) Tbk - SCF 743,985,010,065 786,247,342,663
PT Bank Negara Indonesia Syariah (Persero) Tbk - SCF 389,994,316,412 284,550,843,100
The Bank of Tokyo Mitsubishi UFJ 124,233,724,973 --
PT Bank UOB Indonesia 495,925,582,949 --
The Hongkong Shanghai Banking Corp 310,959,727,224 --
Jumlah/ Total 4,534,800,657,357 2,807,337,769,064

Pada tanggal pelaporan, penggunaan fasilitas SCF As of reporting date, the total amounts of SCF
masih tercatat dalam utang usaha. facility utilized is recognized in accounts payable

48. TRANSAKSI NON-KAS 48. NON-CASH TRANSACTIONS

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Penambahan Aset Tetap Melalui Acquisition of Fixed Asset Through
Utang Usaha 482,626,212,192 1,494,258,842,505 Accounts Payable
Amortisasi Biaya Obligasi 7,922,215,601 5,854,320,716 Amortisation Bonds Expenses
Jumlah 490,548,427,793 1,500,113,163,221 Total

49. ASET DAN LIABILITAS MONETER DALAM MATA 49. MONETARY ASSETS AND LIABILITIES IN
UANG ASING FOREIGN CURRENCY

Pada tanggal 30 Juni 2017 dan 31 Desember 2016, As of June 30, 2017 and December 31, 2016, the
Perusahaan mempunyai aset dan liabilitas moneter Company have monetary assets and liabilities
dalam mata uang asing sebagai berikut: denominated in foreign currencies were as follow:

137
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Mata Uang Asing/ Ekuivalen/ Mata Uang Asing/ Ekuivalen/
Foreign Currency Equivalent Foreign Currency Equivalent
Rp Rp
Aset/ Assets
Kas dan Setara Kas/
Cash and Cash Equivalents USD 9,469,139 126,119,461,833 8,103,634 109,042,498,823
SGD -- -- 31,879 296,444,409
YEN 11,898,725 1,427,933,829 11,898,457 1,373,081,942
EURO 564 8,382,469 566 8,012,326
SAR 29,952 106,379,530 232,904 810,503,705
MYR 271,838 965,484,207 174,885 542,725,487
Piutang Usaha/
Accounts Receivable SAR 14,078,354 50,001,948,118 14,891,492 51,822,243,284
USD 105,240 1,401,688,363 -- --
Piutang Retensi/
Retention Receivables SAR 9,634,286 34,217,997,698 8,536,121 29,705,615,846
USD 7,012,450 93,398,827,144 3,679,665 49,513,566,703
Tagihan Bruto Kepada Pengguna Jasa/
Gross Amount
Due From Customers SAR 986,859 3,505,018,700 -- --
USD 28,790,082 383,455,101,892 38,601,815 519,426,023,065
Jumlah/ Total 694,608,223,783 814,362,958,874

50. SEGMEN OPERASI 50. OPERATION SEGMENT

a. Informasi tentang Produk dan Jasa a. Information Related to Products and


Services

Segmen operasi Perusahaan dikelompokkan The Company’s operation segment is grouped


berdasarkan pekerjaan yang dilakukan. based on the work performed.

Informasi Segmen berdasarkan jenis usaha/ Details information of segment based on


produk adalah sebagai berikut: the type of business/ product were as follow:

30 Juni 2017/ June 30, 2017


Konstruksi/ Sewa Gedung/ Properti/ Precast Energi/ Tol/ Jumlah/
Constructions Building Rental Property Energy Toll Total
Rp Rp Rp Rp Rp Rp Rp
Pendapatan Usaha 15,049,676,154,902 4,910,553,592 67,641,137,507 251,047,515,282 22,565,867,445 152,226,909,870 15,548,068,138,598 Revenues
Beban Pokok Pendapatan 12,549,048,568,975 -- 57,768,460,705 187,053,039,632 8,173,935,735 56,351,991,647 12,858,395,996,694 Cost of Revenues
Laba Bruto 2,500,627,585,927 4,910,553,592 9,872,676,802 63,994,475,650 14,391,931,710 95,874,918,223 2,689,672,141,904 Gross Profit
Tidak Dapat Dialokasikan: Unallocated:
Beban Usaha -- -- -- -- -- -- (386,005,504,961) Operating Expenses
Penghasilan Lain-lain - Bersih -- -- -- -- -- -- 468,329,814,567 Other Revenues - Net
Beban Lain-lain - Bersih -- -- -- -- -- -- (328,916,602,621) Other Expenses - Net
Laba Sebelum Pajak dan Beban Keuangan -- -- -- -- -- -- 2,443,079,848,889 Income Before Tax and Financial Charges
Beban keuangan -- -- -- -- -- -- (880,379,588,713) Financial Charges
Bagian Laba Bersih Entitas Asosiasi Equity in Net Income of Associates
dan Ventura Bersama -- -- -- -- -- -- 26,408,877,163 and Joint Ventures
Laba Sebelum Pajak -- -- -- -- -- -- 1,589,109,137,339 Income Before Tax
Beban Pajak Penghasilan -- -- -- -- -- -- (162,926,675,707) Net Income for the Year
Laba Bersih Periode Berjalan 1,426,182,461,632 Net Income in Current Period

30 Juni 2016/ June 30, 2016


Konstruksi/ Sewa Gedung/ Properti/ Precast Toll/ Jumlah/
Constructions Building Rental Property Toll Total
Rp Rp Rp Rp Rp Rp
Pendapatan Usaha 7,684,449,930,844 501,780,577 -- 334,949,210,340 64,672,908,370 8,084,573,830,131 Revenues
Beban Pokok Pendapatan 6,313,039,951,689 -- -- 245,160,277,348 37,013,730,885 6,595,213,959,922 Cost of Revenues
Laba Bruto 1,371,409,979,155 501,780,577 -- 89,788,932,992 27,659,177,485 1,489,359,870,209 Gross Profit
Tidak Dapat Dialokasikan: Unallocated:
Beban Usaha -- -- -- -- -- (243,834,154,864) Operating Expenses
Penghasilan Lain-lain - Bersih -- -- -- -- -- 105,039,356,360 Other Revenues - Net
Beban Lain-lain - Bersih -- -- -- -- -- (14,618,389,624) Other Expenses - Net
Laba Sebelum Pajak dan Beban Keuangan -- -- -- -- -- 1,335,946,682,081 Income Before Tax and Financial Charges
Beban Keuangan -- -- -- -- -- (405,507,510,501) Financial Charges
Bagian Laba Bersih Entitas Asosiasi Equity in Net Income of Associates
dan Ventura Bersama (7,752,120,546) -- -- -- -- (7,752,120,546) and Joint Ventures
Laba Sebelum Pajak -- -- -- -- -- 922,687,051,034 Income Before Tax
Beban Pajak Penghasilan -- -- -- -- -- (340,453,699,653) Net Income for the Year
Laba Bersih Tahun Berjalan 582,233,351,380 Net Income in Current Year

138
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ June 30, 2017


Konstruksi/ Sewa Gedung/ Properti/ Precast Energi/ Tol/ Jumlah /
Constructions Building Rental Property Energy Toll Total
Rp Rp Rp Rp Rp Rp Rp
Aset Assets
Piutang Usaha 2,329,997,142,622 283,380,058 -- 1,083,456,331,881 -- -- 3,413,736,854,561 Accounts Receivable
Piutang Retensi 1,200,008,848,644 -- -- -- -- -- 1,200,008,848,644 Retention Receivable
Tagihan Bruto Kepada Pengguna Jasa 15,294,899,980,830 -- -- -- -- -- 15,294,899,980,830 Gross Amount Due from Customers
Persediaan 1,191,451,239,420 -- 939,509,375,293 421,227,796,727 -- -- 2,552,188,411,440 Inventories
Aset yang Tidak Dapat Dialokasikan -- -- -- -- -- -- 53,440,831,897,484 Unallocated Assets
Jumlah Aset 75,901,665,992,959 Total Assets
Liabilitas Liabilities
Utang Usaha 11,130,706,819,805 -- -- -- -- -- 11,130,706,819,805 Accounts Payable
Utang Bruto Kepada Pihak Ketiga -- -- -- -- -- -- -- Gross Amount Due to Third Parties
Liabilitas yang Tidak Dapat Dialokasikan -- -- -- -- -- -- 43,899,444,062,428 Unallocated Liabilities
Jumlah Liabilitas 55,030,150,882,233 Total Liabilities

31 Desember 2016/ December 31, 2016


Konstruksi/ Sewa Gedung/ Properti/ Precast Energi/ Jumlah/
Constructions Building Rental Property Energy Total
Rp Rp Rp Rp Rp Rp
Aset Assets
Piutang Usaha 1,889,871,188,326 264,196,029 -- 3,353,308,297,700 -- 5,243,443,682,055 Accounts Receivable
Piutang Retensi 966,697,328,380 -- -- -- -- 966,697,328,380 Retention Receivables
Tagihan Bruto Kepada Pengguna Jasa 13,109,720,040,549 -- -- -- -- 13,109,720,040,549 Gross Amount Due from Customers
Persediaan 1,586,613,309,252 -- 738,171,352,822 231,947,161,468 -- 2,556,731,823,542 Inventories
Aset yang Tidak Dapat Dialokasikan -- -- -- -- -- 39,376,416,959,921 Unallocated Assets
Jumlah Aset 61,253,009,834,447 Total Assets
Liabilitas Liablilities
Utang Usaha 7,361,695,071,900 -- -- -- -- 7,361,695,071,900 Accounts Payable
Utang Bruto Kepada Pihak Ketiga 7,291,439,066,228 -- -- -- -- 7,291,439,066,228 Gross Amount Due to Third Parties
Liabilitas yang Tidak Dapat Dialokasikan -- -- -- -- -- 30,006,659,479,371 Unallocated Liabilities
Jumlah Liabilitas 44,659,793,617,499 Total Liabilities

b. Informasi tentang Wilayah Geografis b. Information Related to the Geographic


Grup beroperasi di enam wilayah geografis The Group’s operation are located in six principal
utama yang berlokasi di Jakarta (Catatan 1). geographical areas which located in Jakarta
Informasi segmen berdasarkan daerah (Note 1). Information segment based on
geografis adalah sebagai berikut: geographical area were as follow:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Aset Assets
Konstruksi Constructions
Divisi I - Jakarta 8,155,788,590,364 9,083,190,160,897 Division I - Jakarta
Divisi III - Jakarta 8,062,994,606,657 7,408,209,115,819 Division III - Jakarta
Divisi V - Jakarta 2,668,354,140,585 3,701,334,360,620 Division V - Jakarta
Divisi IV - Surabaya 2,791,100,183,814 2,425,366,849,797 Division IV - Jakarta
Divisi II - Jakarta 6,861,509,483,385 -- Division II - Jakarta
Divisi VI - Palembang 2,348,509,403,503 -- Division VI - Palembang
Divisi VII - Jakarta 526,907,114,347 -- Division VII - Jakarta
31,415,163,522,654 22,618,100,487,133
Properti/ Property Property
Divisi Realty - Jakarta 379,565,541,544 380,365,565,902 Realty Division - Jakarta
WKR - Jakarta 2,828,964,017,646 2,342,206,940,616 WKR - Jakarta
3,208,529,559,190 2,722,572,506,518
Sewa Gedung Building Rent
Kantor Pusat - Jakarta 27,241,575,387,764 24,308,753,026,682 Head Office - Jakarta
27,241,575,387,764 24,308,753,026,682
Beton Precast Precast
Divisi Precast - Jakarta 144,166,268,210 153,315,333,616 Precast Division - Jakarta
WBP - Jakarta 14,086,819,111,031 13,734,267,485,212 WBP - Jakarta
14,230,985,379,241 13,887,582,818,828

139
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Energi Energy
WSE - Jakarta 289,556,096,420 275,343,132,832 WSE - Jakarta
WKE - Jakarta 40,134,569,862 6,235,309,510 WKE - Jakarta
329,690,666,282 281,578,442,342
Jalan Tol Toll Road
WTR - Jakarta 37,728,781,471,079 22,740,076,933,040 WTR - Jakarta
37,728,781,471,079 22,740,076,933,040
Jumlah Sebelum Eliminasi 114,154,725,986,209 86,558,664,214,543 Total Before Elimination
Eliminasi (38,253,059,993,251) (25,305,654,380,096) Elimination
Jumlah Setelah Eliminasi 75,901,665,992,959 61,253,009,834,447 Total After Elimination

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Liabilitas dan Ekuitas Liabilities and Equities
Konstruksi Constructions
Divisi I - Jakarta 8,155,788,590,364 9,083,190,160,897 Division I - Jakarta
Divisi III - Jakarta 8,062,994,606,657 7,408,209,115,819 Division III - Jakarta
Divisi V - Jakarta 2,668,354,140,585 3,701,334,360,620 Division V - Jakarta
Divisi IV - Surabaya 2,791,100,183,814 2,425,366,849,797 Division IV - Jakarta
Divisi II - Jakarta 6,861,509,483,385 -- Division II - Jakarta
Divisi VI - Palembang 2,348,509,403,503 -- Division VI - Palembang
Divisi VII - Jakarta 526,907,114,347 -- Division VII - Jakarta
31,415,163,522,655 22,618,100,487,133
Properti Property
Divisi Realty - Jakarta 379,565,541,544 380,365,565,902 Realty Division - Jakarta
WKR - Jakarta 2,828,964,017,646 2,342,206,940,616 WKR - Jakarta
3,208,529,559,190 2,722,572,506,518
Sewa Gedung Building Rent
Kantor Pusat - Jakarta 27,241,575,387,762 24,308,753,026,682 Head Office - Jakarta
27,241,575,387,762 24,308,753,026,682
Beton Precast Precast
Divisi Precast - Jakarta 144,166,268,210 153,315,333,616 Precast Division - Jakarta
WBP - Jakarta 14,086,819,111,031 13,734,267,485,212 WBP - Jakarta
14,230,985,379,241 13,887,582,818,828
Energi Energy
WSE - Jakarta 289,556,096,420 275,343,132,832 WSE - Jakarta
WKE - Jakarta 40,134,569,862 6,235,309,510 WKE - Jakarta
329,690,666,282 281,578,442,342
Jalan Tol Toll Road
WTR - Jakarta 37,728,781,471,078 22,740,076,933,040 WTR - Jakarta
37,728,781,471,078 22,740,076,933,040
Jumlah Sebelum Eliminasi 114,154,725,986,207 86,558,664,214,543 Total Before Elimination
Eliminasi (38,253,059,993,248) (25,305,654,380,096) Elimination
Jumlah Setelah Eliminasi 75,901,665,992,959 61,253,009,834,447 Total After Elimination

140
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016
Rp Rp
Pendapatan Usaha Sales
Konstruksi Constructions
Divisi I - Jakarta 3,244,612,176,403 3,107,390,134,949 Division I - Jakarta
Divisi III - Jakarta 4,490,361,682,604 -- Division III - Jakarta
Divisi V - Jakarta 1,325,277,310,735 836,416,508,608 Division V - Jakarta
Divisi IV - Surabaya 1,074,151,200,798 756,909,724,184 Division IV - Surabaya
Divisi II - Jakarta 1,422,878,102,779 2,265,866,937,765 Division II - Jakarta
Divisi VI - Palembang 1,350,419,055,066 -- Division VI - Palembang
Divisi VII - Jakarta 236,605,416,095 -- Division VII - Jakarta
13,144,304,944,479 6,966,583,305,506
Properti/ Property Property
Divisi Realty - Jakarta -- Realty Division - Jakarta
WKR - Jakarta 71,894,034,177 13,042,623,855 WKR - Jakarta
71,894,034,177 13,042,623,855
Sewa Gedung Building Rent
Kantor Pusat - Jakarta 657,656,922 501,780,577 Head Office - Jakarta
657,656,922 501,780,577
Beton Precast Precast
WBP - Jakarta 2,668,386,459,111 1,869,221,303,461 WBP - Jakarta
2,668,386,459,111 1,869,221,303,461
Energi Energy
WSE - Jakarta 22,565,867,445 -- WSE - Jakarta
WKE - Jakarta -- -- WKE - Jakarta
22,565,867,445 --
Jalan Tol - Jakarta Toll Road
WTR - Jakarta 5,544,411,601,077 1,480,096,401,304 WTR - Jakarta
5,544,411,601,077 1,480,096,401,304
Jumlah Sebelum Eliminasi 21,452,220,563,211 10,329,445,414,703 Total Before Elimination
Eliminasi (5,904,152,424,613) (2,244,871,584,572) Elimination
Jumlah Setelah Eliminasi 15,548,068,138,598 8,084,573,830,131 Total After Elimination

51. PERKARA HUKUM 51. LEGAL CASES

1. Komisi Pengawas Persaingan Usaha (KPPU) 1. Commission for the Supervision of Business
menduga adanya persekongkolan horizontal dan Competition (KPPU) suspects a horizontal and
vertikal pada Proyek Pembangunan Gedung vertical conspiracy in Building Project of Care
Perawatan dan Pelayanan Kelas I dan VII Rumah and Service Class I and VII Building of
Sakit Sulawesi Tenggara antara panitia pengadaan Southeast Sulawesi Hospital between the
(terlapor I), Perusahaan (terlapor II), PT Adhi Karya procurement committee (Defendant I), the
(Persero) Tbk (ADHI) (terlapor III) dalam register Company (Defendant II), PT Adhi Karya
KPPU No 04/KPPU-L/2012. (Persero) Tbk (ADHI) (Defendant III) in register
of KPPU No. 04 /KPPU-L/2012.

Putusan KPPU pada tanggal 25 April 2013, The verdict of KPPU dated April 25, 2013,
menjatuhkan hukuman kepada terlapor II untuk passed sentence to the Defendant II to pay a
membayar denda sebesar Rp 3.168.820.000. Atas fine amounting Rp 3,168,820,000. On the
putusan tersebut terlapor II mengajukan upaya verdict, the Defendant II has filed an
hukum pembatalan putusan pada Pengadilan annulment of verdict at District Court (PN) of
Negeri (PN) Jakarta Timur. East Jakarta.

PN Jaktim mengeluarkan putusan District Court of East Jakarta issued a verdict


No. 01/Pdt.KPPU/2013/PN.Jkt.Tim tanggal 21 Mei No. 01/Pdt.KPPU/2013/PN.Jkt.Tim dated
2015 menyatakan batal demi hukum putusan KPPU May 21, 2015 declared void and null the
No. 04/KPPU-L/2012 tanggal 26 April 2012 dengan verdict of KPPU No. 04/KPPU-L/2012 dated
segala akibat hukumnya. April 26, 2012 with all the legal consequences.

KPPU mengajukan upaya kasasi pada tanggal KPPU files cassation efforts on September 15,
15 September 2015 dimana memori kasasi telah 2015 in which the memory of cassation has
diajukan oleh KPPU tertanggal 28 September 2015, been proposed by KPPU dated September 28,
dan kontra memori kasasi diajukan oleh 2015, and contra memory of cassation filed by
Perusahaan pada 3 Desember 2015. Sampai the Company on December 3, 2015. As of the
dengan tanggal pelaporan Perusahaan masih reporting date the Company is still waiting for
menunggu hasil putusan kasasi. the appeal results.

141
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

2. Perkara Pekerjaan Tanah Tahap III dan 2. Land Work Case Phase III and Aeronautical
Aeronautical Pavement Runway Bandara Medan Pavement Runway of Medan Baru Airport.
Baru.

Perusahaan dan PT Yasa Patria Perkasa The Company and PT Yasa Patria Perkasa
tergabung dalam suatu kerjasama operasi dengan joined in a joint operation under the name
nama KSO Waskita-Yasa mengajukan gugatan ke KSO Waskita-Yasa filed a lawsuit to the PN
PN Lubuk Pakam di Deli Serdang sebagai Lubuk Pakam in Deli Serdang as plaintiff
penggugat melawan Pemerintah Republik against the Government of the Republic of
Indonesia cq Kementerian Perhubungan cq Indonesia cq Ministry of Transportation cq
Direktorat Jenderal Perhubungan Udara cq Pejabat Directorate General of Civil Aviation cq
Pembuat Komitmen Satuan Kerja Bandar Udara Commitment Maker Official of Medan Baru
Medan Baru sebagai tergugat dalam perkara Airport Work Unit as a defendant in case
No. 15/PDT.G/2014/PN.LP tanggal 25 Pebruari No. 15/PDT.G/2014/PN.LP dated Februari 25,
2014 karena adanya biaya eskalasi, tambahan 2014 due to the cost escalation, additional tax
biaya pajak galian C, overhead dan ganti rugi expense of excavation C, overhead and
kerugian immaterial dengan jumlah sebesar immaterial loss compensation totaling
Rp 168.471.023.440 ditambah bunga sebesar 2% Rp 168,471,023,440 plus interest of 2% per
per bulan sejak gugatan ini didaftarkan. month since the lawsuit was filed.

Putusan PN Lubuk Pakam pada tanggal PN Lubukpakam verdict on October 23, 2014
23 Oktober 2014 yang amar putusannya that the dictum sentences the defendant to
menghukum tergugat untuk membayar ganti rugi pay material compensation amounting to
material sebesar Rp 97.383.218.000. Rp 97,383,218,000 material.

Tergugat telah mengajukan banding pada tanggal The Defendant has filed appeal on December
9 Desember 2014 ke Pengadilan Tinggi Medan. 9, 2014 to the High Court of Medan.

Tanggal 27 Mei 2015 Pengadilan Tinggi Medan On May 27, 2015, the High Court of Medan
telah mengeluarkan putusan No. 13/PDT/2015 issued a verdict No. 13/PDT/2015/PT.MDN
/PT.MDN yaitu menguatkan putusan PN Lubuk which upheld the verdict of PN Lubuk Pakam
Pakam No. 15/Pdt.G/2014 /PN.Lbp. No. 15/Pdt.G/2014/PN.Lbp.

Tergugat mengajukan kasasi pada tanggal 14 Juli The Defendant filed a cassation on July 14,
2015, Perusahaan telah memasukan kontra 2015, the Company has submitted contra
memori kasasi pada tanggal 7 September 2015. memory of cassation on September 7, 2015.

Putusan MARI No. 3330K/Pdt/2015 tanggal MARI verdict No. 3330K/Pdt/2015 on the
23 Maret 2016 dengan amar putusan menolak March 23, 2016 with dictum rejected the
permohonan kasasi. Putusan ini telah mempunyai cassation. This verdict has a permanent legal
kekuatan hukum tetap. force.

3. Perkara Pembangunan Sarana dan Prasarana 3. Case of Construction of Facilities and


Pembangunan Sport Centre Bukik Bunian Lubuk Infrastructure of Sport Center Bukik Bunian
Basung. Lubuk Basung.

Perusahaan mengajukan gugatan ke PN Lubuk The Company filed a lawsuit to PN Lubuk


Basung, Sumatera Barat melawan Dinas Pekerjaan Basung, West Sumatra against the
Umum Pemerintah Kabupaten Agam sebagai Department of Public Works of agam Regency
tergugat atas Pembangunan sarana dan prasarana Government as a defendant on construction of
pusat olahraga di Bukit Bunian Lubuk Basung, facilities and Infrastructure of Sports Center in
Kabupaten Agam, pada tanggal 24 Juli 2014 Bukit Bunian Lubuk Basung, Agam Regency,
dengan nomor register gugatan on July 24, 2014 with a lawsuit registration
No. 16/PDT.G/2014/PN.LBB dan nilai gugatan atas number No. 16/PDT.G/2014/PN.LBB and
sisa pembayaran termin sebesar Rp 2.150.080.000. action on value of lawsuit on remaining
payments amounting Rp 2,150,080,000.
PN Lubuk Basung mengeluarkan putusan pada Lubuk Basung District Court issued a verdict
tanggal 13 Mei 2015 menghukum tergugat untuk on May 13, 2015 to sentence the defendant to
membayar sisa termin sebesar Rp 2.150.080.000 pay the remaining installments of
kepada penggugat. Rp 2,150,080,000 to the Plaintiff.

Pada tanggal 22 Juni 2015, tergugat mengajukan On June 22, 2015, the Defendant filed an
banding ke Pengadilan Tinggi Padang. Kontra appeal to the High Court of Padang. The

142
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

memori banding telah diajukan Perusahaan pada contra memory of cassation has been filed by
tanggal 31 Juli 2015. the Company on July 31, 2015.

Putusan Pengadilan Tinggi Padang Verdict of High Court Padang


No. 127/PDT/2015/PT.PDG tanggal 30 Nopember No. 127/PDT/2015/PT.PDG dated
2015 dengan amar putusan menguatkan putusan November 30, 2015 by dictum that upheld of
PN Lubuk Basung. the verdict of District Court of Lubuk Basung.

Tergugat mengajukan kasasi atas putusan The Defendant filed a cassation against the
Pengadilan Tinggi Padang pada tanggal verdict of High Court of Padang dated 11th
11 Pebruari 2016. Memori kasasi diajukan tanggal February, 2016. Memory of cassation filed on
18 Maret 2016. Kontra memori kasasi diajukan oleh March 18, 2016. Contra memory of cassation
Perusahaan tanggal 29 Maret 2016. Sampai filed by the Company on March 29, 2016. As
dengan tanggal pelaporan Perusahaan masih of the reporting date the Company is still
menunggu hasil putusan kasasi. awaiting for the lawsuit results.

4. Perkara Pembangunan Jalan Dalam Kota 4. Case of Construction of Pontianak-Tayan Intra


Pontianak – Tayan. Urban Road

Perusahaan mengajukan permohonan arbitrase ke The Company has filed an arbitration to the
Badan Arbitase Nasional Indonesia (BANI) sebagai Indonesia National Board of Arbitration (BANI)
pemohon melawan Pejabat Pembuat Komitmen as a plaintiff against the Commitment Maker
(PPK) 04 Pembangunan Jalan Dalam Kota-Tayan Official (PPK) 04 on Construction of Tayan
qq. Kementrian Pekerjaan Umum. Permohonan Intra Urban Road qq. Ministry of Public Works.
arbitase telah di daftarkan ke BANI dengan Perkara The arbitration appeal has been registered to
No. 718/VI/ARB-BANI/2015 pada tanggal 10 Juni BANI with Case No. 718/VI/ARB-BANI/2015
2015 atas biaya idle alat, perbaikan cross fall, on June 10, 2015 on idle tools cost, repair
overhead, biaya perubahan desain, biaya cross fall, overhead, the cost of design
pekerjaan tambah dan bunga bank dengan jumlah changes, the cost of extra work and bank
Rp 72.813.123.228. interest by the amount of Rp 72.813.123.228.

Majelis arbiter mengeluarkan putusan pada tanggal Arbitration Assembly issued a verdict on 11th
11 April 2016, menyatakan bahwa mewajibkan April 2016, states that require the defendant to
termohon untuk membayar kepada pemohon pay to the plaintiff the amount of
sejumlah Rp 50.719.488.256.000, termasuk PPN Rp 50,719,488,256,000, including 10% VAT
10% dan mengembalikan biaya BANI and refund the cost of BANI amounting
Rp 499.450.000. Rp 499,450,000.

Termohon mengajukan permohonan pembatalan The defendant filed a request for annulment of
putusan BANI pada tanggal 27 Mei 2016 di PN verdict of BANI on May 27, 2016 in Pontianak
Pontianak. District Court.

PN Pontianak mengeluarkan putusan No. 56/pdt.G- Pontianak District Court issued a verdict
ARB/2016/PN.PTK tanggal 24 Agustus 2016 No. 56/pdt.G-ARB/2016/PN.PTK dated August
menyatakan menolak permohonan pemohon untuk 24, 2016 states to reject the request of the
seluruhnya. plaintiff entirely.

Pada tanggal 26 September 2016, Termohon On September 26, 2016 the defendant filed a
mengajukan Kasasi atas Putusan Pengadilan cassation on Verdict of Pontianak District
Negeri Pontianak dan tanggal 14 Oktober 2016, Court and on October 14, 2016, the Company
Perusahaan mengajukan Kontra Memori Kasasi filed Contra Memory of Cassation to the
kepada Mahkamah Agung. Sampai dengan tanggal Supreme Court. As of the reporting date the
pelaporan Perusahaan masih menunggu hasil Company is still waiting for the lawsuit results.
putusan kasasi.

5. Perkara Pembangunan Mesjid Raya dan Islamic 5. Case of Construction of Great Mosque and
Centre. Islamic Center.

Perusahaan mengajukan gugatan ke PN Tanjung The Company filed a lawsuit to Tanjung


Pinang sebagai penggugat melawan Pemerintah Pinang District Court as the plaintiff against the
Republik Indonesia cq Pemerintah Kepulauan Riau Government of the Republic of Indonesia cq
cq Dinas Pekerjaan Umum Kepulauan Riau cq the Government of Riau Islands cq
Kepala Dinas Pekerjaan Umum Kepulauan Riau Department of Public Works of Riau Islands cq

143
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

selaku pengguna anggaran sebagai tergugat pada as Head of Department of Public Works of
Proyek Pembangunan Mesjid Raya dan Islamic Riau Islands as user of budget as a defendant
Centre Propinsi Kepulauan Riau atas eskalasi dan in the construction Project of the Great
denda keterlambatan pekerjaan, sebesar Mosque and Islamic Center of Province of
Rp 12.534.461.201 dengan nomor perkara Riau Islands on escalation and penalty of late
No. 7/PDR.G/2015/PN.Tpg pada tanggal work, amounting to Rp 12,534,461,201 with
20 Pebruari 2015. case number No. 7/PDR.G/2015/PN.Tpg on
February 20, 2015.

Putusan PN Tanjung Pinang tanggal 18 Juni 2015 Tanjung Pinang District Court on June 18,
menghukum tergugat membayar ganti rugi kepada 2015 sentences the Defendant to pay
penggugat sebesar Rp 8.085.242.999,68 tanpa compensation to the Plaintiff amounting
Pajak Pertambahan Nilai (PPN). Rp 8,085,242,999.68 without Value Added Tax
(VAT).

Pihak tergugat mengajukan banding pada tanggal The defendant filed an appeal on
3 September 2015. September 3, 2015.

Putusan Pengadilan Tinggi Tanjung Pinang The verdict of Tanjung Pinang High Court
No. 82/PDT/2016/PT.PBR tanggal 29 Juni 2016 No. 82/PDT/2016/ PT.PBR dated June 29,
yang amar putusannya menguatkan putusan PN 2016 that the dictum upheld the verdict of
Tanjung Pinang No. 7/PDT.G/2015/PN.Tpg tanggal Tanjung Pinang District Court No. 7/PDT.G
18 Juni 2015. /2015/ PN.Tpg dated June 18, 2015.

Tanggal 28 September 2016 tergugat mengajukan On September 28, 2016, the defendant filed a
memori kasasi dan 11 Oktober 2016 Perusahaan memory of cassation and on October 11, 2016
mengajukan Kontra Memori Kasasi. Sampai the Company filed Contra memory of
dengan tanggal pelaporan Perusahaan masih cassation. As of the reporting date of the
menunggu hasil putusan kasasi. Company is still waiting for the lawsuit results.

6. Perkara Kepemilikan Lahan Pada Proyek Jalan Tol 6. Case of Land Ownership of Bekasi Cawang
Bekasi Cawang Kampung Melayu. Kampung Melayu Toll Road Project.

Para ahli waris Muhammad Ba’at mengajukan The heirs of Muhammad Ba'at heirs filed a tort
gugatan perbuatan melawan hukum atas on land ownership due to the construction of
kepemilikan tanah akibat pembangunan Proyek Bekasi Cawang Kampung Melayu Toll Road
Jalan Tol Bekasi Cawang Kampung Melayu Project (Becakayu) at East Jakarta District
(Becakayu) di PN Jakarta Timur dengan register Court with Register No. 441/Pdt.G/2015/
No. 441/Pdt.G/2015/PN.Jkt.Tim tanggal PN.Jkt.Tim dated November 25, 2015, in
25 Nopember 2015, dimana para tergugat adalah: which the defendants are:

 Perum Jasa Tirta II (tergugat I);  Perum Jasa Tirta II (Defendant I);
 Menteri Pekerjaan Umum dan Perumahan  Minister of Public Works and Public
Rakyat cq. Direktorat Jalan Bebas Hambatan Housing cq. Directorate of Urban Toll
Perkotaan and Fasilitas Jalan Daerah cq. PPK Road and Local Road Facilities cq. PPK
Proyek Becakayu (tergugat II); Becakayu Project (Defendant II);
 Pemerintah provinsi DKI Jakarta cq.  Provincial Government of DKI Jakarta cq.
Pemerintah kota Administrasi Jakarta Timur East Jakarta Municipal Administration cq.
cq. Panitia Pengadaan Tanah untuk Land Procurement Committee for public
kepentingan umum (tergugat III); interest (Defendant III);
 Pemerintah Republik Indonesia cq.  Government of the Republic of Indonesia
Kementrian Agraria dan Tata Ruang/Badan cq. Ministry of Agrarian Affairs and
Pertanahan Nasional (BPN) cq. Kepala Spatial/National Land Agency (BPN) cq.
Agraria/BPN Jakarta Timur (turut tergugat I); Head of Agrarian/BPN of East Jakarta
dan (also a defendant I); and
 Perusahaan (turut tergugat II).  The Company (co-defendant II).

Nilai Gugatan yang diajukan materil sebesar The value of lawsuit filed material as of
Rp 32.100.000.000 dan immateril sebesar Rp 32,100,000,000 immaterial
Rp 25.000.000.000. Rp 25,000,000,000

Amar Putusan Pengadilan Negeri Jakarta Timur, The adictum of East Jakarta District Court,
tanggal 3 Oktober 2016 menyatakan gugatan dated October 3, 2016 states that the
penggugat tidak dapat diterima. plaintiff’s claim is unacceptable.

144
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Atas putusan tersebut, tidak ada upaya hukum Upon the verdict, no legal effort has been filed
yang diajukan oleh Penggugat. by the Plaintiff.

7. Perkara Pembangunan Jalan Tol Nusa Dua – 7. Case of Nusa Dua Toll Road Construction -
Ngurah Rai – Benoa Paket 2 dan Paket 4. Ngurah Rai - Benoa Package 2 and
Packages 4.

Perusahaan sebagai penggugat mengajukan The company as the plaintiff filed a lawsuit to
gugatan kepada PT. Jasa Marga Bali Tol di PT. Jasa Marga Bali Tol at Denpasar District
Pengadilan Negeri Denpasar dengan No register Court with No register 903/Pdt/G/2015/PN
903/Pdt/G/2015/PN DPS tanggal 1 Desember 2015. DPS dated December 1, 2015.

Perusahaan mengajukan gugatan terkait biaya The Company filed a lawsuit related to extra
tambah pekerjaan tiang pancang paket 2 dan paket work of piling of package 2 and 4 with interest
4 beserta bunga keterlambatan dengan nilai for delay with the value of lawsuit submitted
gugatan yang diajukan materil sebesar material amounting Rp 64,576,067,774 and
Rp 64.576.067.774 dan immateril sebesar immaterial amounting Rp 30,000,000,000.
Rp 30.000.000.000.

Amar Putusan PN Denpasar, tanggal 20 Juni 2016 The dictum of Denpasar District Court, dated
menyatakan tergugat telah wanprestasi dan June 20, 2016 states the defendant has
menghukum tergugat untuk membayar ganti rugi defaulted and sentenced the defendant to pay
sebesar Rp 64.576.067.774 dan bunga sebesar 2% compensation of Rp 64,576,067,774 and 2%
disetiap bulannya. interest in each month.

PT Jasa Marga Bali Tol mengajukan banding atas PT Jasa Marga Bali Toll filed a cassation
putusan PN Denpasar, tanggal 28 Juni 2016. against the verdict of Denpasar District Court,
dated June 28, 2016.

Amar Putusan PT Denpasar No. 156/Pdt/2016/PT The dictum of Denpasar District Court
DPS, tanggal 20 Desember 2016. Menerima No. 156/Pdt/2016/PT DPS, on December 20,
Permohonan Banding yang diajukan Tergugat dan 2016. To accept the appeal filed by Defendant
membatalkan Putusan Pengadilan Negeri and annul the District Court's Verdict No.
No. 903/Pdt/G/2015/PN.DPS. 903/Pdt/G/2015/PN.DPS.

Perusahaan mengajukan Kasasi atas putusan The Company filed the cassation on verdict of
PT Denpasar pada tanggal 14 Pebruari 2017 PT Denpasar on February 14, 2017 with
dengan No Register: 9/Pdt.Kasasi/2017/PN DPS. No. Register: 9/Pdt.Kasasi/2017/PN DPS.

Sampai dengan tanggal pelaporan, Perusahaan As of the reporting date the Company is still
masih menunggu Putusan Kasasi. waiting for the lawsuit results.

8. Perkara kepemilikan lahan pada proyek Jalan Tol 8. Case of Land Ownership of Bekasi Cawang
Bekasi Cawang Kampung Melayu. Kampung Melayu Toll Road Project.

Para ahli waris Berlin Saragih Manihuruk The heirs of Berlin Saragih Manihuruk filed a
mengajukan gugatan untuk tidak akan melakukan lawsuit not to demolish the houses in East
pembongkaran rumah di PN Jakarta Timur dengan Jakarta District Court with register
No register 383/Pdt.G/2015/PN.Jkt.Tim tanggal No.383/Pdt.G/2015/PN.Jkt.Tim dated
19 Oktober 2015, dimana para tergugat adalah: October 19, 2015, where the defendants are:

 Pemerintah provinsi DKI Jakarta Kota  Provincial Government of DKI Jakarta,


Administrasi Jakarta Timur Panitia Pengadaan East Jakarta Municipality, Land
Tanah untuk kepentingan umum (tergugat I); Procurement Committee for public
interest (Defendant I);
 Perum Jas Tirta (tergugat II);  Perum Jasa Tirta (Defendant II);
 BPN Kantor Pertanahan Kota Administrasi  National Land Agency (BPN) of East
Jakarta Timur (tergugat III); Jakarta Municipality (Defendant III);
 Pemeritah provinsi DKI Jakarta Kota  Provincial Government of DKI Jakarta,
Administrasi Jakarta Timur Kecamatan East Jakarta Municipality, Makassar Sub-
Makasar (tergugat IV); district (Defendant IV);
 Pemerintah provinsi DKI Jakarta Kota  Provincial Government of DKI Jakarta,
Administrasi Jakarta Timur Kecamatan East Jakarta Municipality, Cipinang

145
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Cipinang Melayu (tergugat V); dan Melayu Sub-district (Defendant V); and
 Perusahaan (tergugat VI).  The Company (defendant VI).

Tidak ada nilai gugatan, hanya menyatakan No value of lawsuit filed, it is solely merely
kepemilikan tanah adalah milik para Penggugat dan stating that the ownership of the land belongs
tidak melakukan pembongkaran rumah to the Plaintiffs and does not demolish the
house

Amar Putusan Pengadilan Negeri Jakarta Timur, The dictum of the East Jakarta District Court,
tanggal 21 Nopember 2016 menyatakan gugatan dated November 21, 2016, states that the
penggugat tidak dapat diterima dan menerima plaintiff's claim is unacceptable and to receive
sebagian eksepsi dari para tergugat. some exception from the defendants.

Atas putusan tersebut, tidak ada upaya hukum Upon the verdict, no legal efforts has been
yang diajukan oleh Penggugat. filed by the Plaintiff.

9. Perkara pekerjaan pengembangan prasarana 9. Case of development of infrastructure of coal


pertambangan batubara tahap I Muara Teweh. mining phase I in Muara Teweh, Central
Kalimantan Tengah Kalimantan

Perusahaan bagian dari Konsorsium Waskita dan The Company is part of Consortium of
PT Jakarta Prima Cranes (JPC) mengajukan Waskita and PT Jakarta Prima Cranes (JPC)
tuntutan kepada PT Suprabari Mapanindo Mineral filed a lawsuit against PT Suprabari Mapanindo
(SMM) di Badan Arbitrase Nasional (BANI) dengan Minerals (SMM) in the National Arbitration
register No. 794/II/ARB-BANI/2016 tanggal Board (BANI) with register No. 794/II/ARB-
2 Pebruari 2016. BANI /2016 dated February 2, 2016.

Klaim yang diajukan adalah pembayaran tagihan The Claims filed is payment of progress bill of
progress bulan Agustus 2014 s/d bulan Januari August 2014 to January 2015 and the
2015 serta pembayaran ganti kerugian lainnya. payment of other compensations amounting
sebesar USD 31.086.851,46 (setara Rp 404 miliar). USD 31,086,851.46 (equivalent to Rp 404
billion).

PT Suprabari Mapanindo Mineral mengajukan PT Suprabari Mapanindo Mineral filed a


jawaban dan tuntutan balik atas kerugian dan response and counterclaim for compensations
kerusakan yang timbul atas kelalaian pemohon and damages arising from the negligence of
sebesar USD 44.068.855,54 (setara +/- Rp 594 the applicant amounted to
miliar) tanggal 24 Maret 2016. USD 44,068,855.54 (equivalent to Rp +/- 594
billion) on March 24, 2016

Sampai tanggal pelaporan, proses persidangan As of reporting date, the arbitration


arbitrase masih berlangsung. proceedings are still ongoing.

10. Pekerjaan tanggap darurat (Emergency Spilway) 10. Emergency Spilway and Toe Drain on Natural
dan Toe Drain pada proyek Penanganan Bencana Disaster Management Project of Dam Way
Alam Natural Dam Way Ella, Maluku. Ella, Maluku.

Perusahaan sebagai Penggugat mengajukan Company as plaintiff filed a lawsuit against


gugatan kepada Pejabat Pembuat Komitmen Commitment Maker Official of Operations and
Operasi dan Pemeliharaan Sumber Daya Air qq Maintenance of Water Resources Unit qq
Satuan Kerja Operasi dan Pemeliharaan Sumber Operation and Maintenance of Water
Daya Air qq Balai Wilayah Sungai Maluku (BWS) di Resources Work Unit qq Sungai Maluku Hall
PN Ambon dengan register No. 90/Pdt.G/ (BWS) in Ambon District Court register
2016/PN.Ambn, tanggal 26 April 2016. No. 90/Pdt.G/2016/PN.Ambn, dated April 26,
2016.

Nilai gugatan sebesar Rp 74.524.912.800. The value of lawsuit is Rp 74,524,912,800.

Sidang pada tanggal 26 Mei 2016 dengan agenda Assembly on May 26, 2016 with the agenda of
mediasi, para pihak sepakat mengadakan mediation, the parties agreed to solve this
perdamaian. case in peace.

146
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Tanggal 14 Juni 2016 Para pihak mengadakan On June 14, 2016 the parties entered a peace
perjanjian perdamaian yang isinya tergugat wajib agreement which states that the defendant
melakukan pembayaran uang senilai should pay the money worth
Rp 55.552.989.000 kepada penggugat selambat- Rp 55,552,989,000 to the Defendant at
lambatnya dalam kurun waktu tahun anggaran the latest within a period of fiscal year 2016.
2016.

Amar Putusan Pengadilan Negeri Ambon tanggal The dictum of Ambon District Court on
4 Agustus 2016 menguatkan perjanjian August 4, 2016 upheld such agreement.
Perdamaian tersebut.

11. Permasalahan Pembangunan jalan akses E2 11. Case of Construction of E2 Tanjung Priok
Tanjung Priok dengan nomor perkara access road with the case number
No. 843/IV/ARB-BANI/2016. No. 843/IV/ARB-BANI/2016.

Perusahaan bagian KSO dengan Kajima The company is part of Joint Operation with
Corporation mengajukan tuntutan kepada PT DCA Kajima Corporation filed a lawsuit against
Pracetak Indonesia di Badan Arbitrase Nasional PT DCA Pracetak Indonesia at the National
(BANI) dengan No register 843/IV/ARB-BANI/2016 Arbitration Board (BANI) with registers
tanggal 29 April 2016. No. 843/IV/ARB-BANI/2016 dated April 29,
2016.

Isi gugatan menyatakan bahwa termohon telah The content of lawsuit states that the
wanprestasi karena memasok beton readymix yang defendant was in default because it supplies
tidak sesuai dengan yang ditentukan dalam the Readymix concrete that does not comply
perjanjian vendor. with those specified in the vendor agreement.

Nilai gugatan sebesar Rp 227.582.255.938 dan The value of the lawsuit amounted to
¥ 865.279.268. Rp 227,582,255,938 and ¥ 865,279,268.

Tanggal 06 Februari 2017, sidang pemeriksaan On February 06, 2017, an expert witness
saksi ahli dari para pihak. Sidang selanjutnya pada examination session of the parties. The next
tanggal 07 April 2017, dengan agenda sidang trial is on April 7, 2017, with the agenda of the
pembacaan putusan. hearing to read out the verdict.

12. Perselisihan Hubungan Industrial antara 12. Industrial Relations Disputes between the
Perusahaan dengan mantan karyawan. Company and former employees.

Perusahaan digugat oleh mantan pegawai pada The company was sued by a former employee
Pengadilan Hubungan Industrial PN. Jakarta Pusat to the Industrial Relations Court of Central
pada tanggal 28 Desember 2016 dengan nomor Jakarta District Court on December 28, 2016
perkara No. 357/Pdt.Sus-PHI/2016/PN.JKT.PST with case number No. 357/ Pdt.Sus-
sebagai tergugat terkait kekurangan pembayaran PHI/2016/PN.JKT.PST as the defendant
pesangon dan tunjangan hari tua purna karyawan. related to the lack of severance pay and post-
retirement benefits.

Sidang pertama digelar pada 10 Januari 2017 The first hearing was held on January 10,
dengan agenda pengenalan para pihak dan sidang 2017 with the agenda of the introduction of the
pada tanggal 30 Maret 2017 adalah pemeriksaan parties and the hearing on March 30, 2017
saksi penggugat. Agenda sidang selanjutnya pada was the examination of the plaintiff's witness.
tanggal 6 April 2017 masih dengan agenda yang The next agenda of the trial on April 6, 2017 is
sama yaitu pemeriksaan saksi penggugat. still on the same agenda, namely the
examination of the plaintiff's witness.

147
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

52. SIFAT DAN TRANSAKSI PIHAK-PIHAK BERELASI 52. NATURE AND TRANSACTIONS WITH RELATED
PARTIES

Sifat hubungan berelasi Nature of relationship

a. Pemerintah Republik Indonesia melalui a. The Government of the Republic of Indonesia


Kementerian Keuangan adalah pemegang saham represented by Ministry of Finance, is the
utama Perusahaan. majority stockholder of the Company.

b. Seluruh entitas yang dimiliki dan dikendalikan oleh b. All entities that are owned and controlled by
Kementerian Keuangan Pemerintah Republik the Ministry of Finance of the Republic of
Indonesia serta entitas dimana Kementerian Indonesia including entities where the
Keuangan Pemerintah Republik Indonesia Ministry of Finance Republic of Indonesia
memiliki pengaruh signifikan: Badan Usaha Milik have significant influence: State-owned
Negara (BUMN). Enterprise (SOE).

c. Pihak berelasi yang pemegang saham utamanya c. Related parties which main shareholder same
sama dengan Grup. with Group.

d. Pihak berelasi yang merupakan perusahaan d. Related parties which are associates of the
asosiasi dari entitas anak. Company’s subsidiaries.

e. Manajemen kunci yang meliputi anggota dewan e. Key management personnel includes
Komisaris dan Direksi Perusahaan. Commissioners and Directors of the
Company.

Transaksi pihak berelasi Transactions with related parties

Berikut ini adalah transaksi dengan entitas berelasi: The following are transactions with related parties:

Pihak-pihak Berelasi / Related Parties Transaksi Transactions


PT Angkasa Pura II (Persero) Tagihan Bruto Gross Amount due to from Customer
Indonesia Eximbank Kas dan Setara Kas, Utang Bank Cash and Cash Equivalent, Bank Loan
PT Bank Mandiri (Persero) Tbk Kas dan Setara Kas, Utang Bank, Tagihan Bruto, Pendapatan Usaha, Uang Muka Cash and Cash Equivalent, Bank Loan, Gross Amount due to from Customer, Revenues
PT Bank Negara Indonesia (Persero) Tbk Kas dan Setara Kas, Utang Bank Cash and Cash Equivalent, Bank Loan
PT Bank Rakyat Indonesia (Persero) Tbk Kas dan Setara Kas, Utang Bank Cash and Cash Equivalent, Bank Loan
PT Bank Syariah Mandiri (Persero) Kas dan Setara Kas Cash and Cash Equivalent
PT Bank Tabungan Negara (Persero) Tbk Kas dan Setara Kas Cash and Cash Equivalent
PT Dok Kodja Bahari (Persero) Piutang Usaha, Uang Muka Accounts Receivable, Advance
PT Jasa Marga (Persero) Tbk Piutang Usaha, Tagihan Bruto, Pendapatan Usaha, piutang Retensi Accounts Receivable, Gross Amount due to from Customer, Revenues, Retention Receivables
PT Jasa Marga Bali Tol Piutang Retensi Retention Receivable
PT Kertas Leces (Persero) Piutang Usaha Accounts Receivable
PT Pelabuhan Indonesia II (Persero) Piutang Usaha, Tagihan Bruto, Pendapatan Usaha, Piutang Retensi Accounts Receivable, Gross Amount due to from Customer, Revenues, Retention Receivables
PT Perusahaan Listrik Negara (Persero) Piutang Usaha, Piutang Retensi, Tagihan Bruto, Pendapatan Usaha, Uang Muka Accounts Receivable, Retention Receivable, Gross Amount due to from Customer, Revenues,
Advance
PT Semen Padang (Persero) Tagihan Bruto, Pendapatan Usaha, Uang Muka Gross Amount due to from Customer, Revenues, Advance
PT Trans Marga Jateng Piutang Retensi, Tagihan Bruto Retention Receivable, Gross Amount due to from Customer
PT Kereta Api Indonesia (Persero) Tagihan Bruto, Pendapatan Usaha, Uang Muka Gross Amount due to from Customer, Revenues, Advance
PT Transmarga Jatim Pasuruan Piutang Usaha, Tagihan Bruto, Pendapatan Usaha, Piutang Retensi Accounts Receivable, Gross Amount due to from Customer, Revenues, Retention Receivable
PT Rekayasa Industri (Persero) Piutang Retensi, Tagihan Bruto, Uang Muka, Pendapatan Usaha, Piutang Usaha Retention Receivable, Gross Amount due to from Customer, Advance, Revenues, Accounts
Receivable
PT Hotel Indonesia Natour (Persero) Tagihan Bruto, Pendapatan Usaha, Piutang Usaha, Uang Muka Gross Amount due to from Customer, Revenues, Accounts Receivable, Advance
PT Perusahaan Pengelola Aset (Persero) Aset Keuangan Dimiliki Hingga Jatuh Tempo, Piutang lain-lain Held to Manurity Financial Assets, Other Receivable
PT Istaka Karya (Persero) Piutang Lain-lain Other Receivable
PT Solo Ngawi Jaya Tagihan Bruto, Pendapatan Usaha, Uang Muka Gross Amount due to from Customer, Revenues, Advance
PT Hutama Karya (Persero) Tagihan Bruto, Pendapatan Usaha Gross Amount due to from Customer, Revenues
PT Multi Terminal Tagihan Bruto, Gross Amount due to from Customer
PT Ngawi Kertasono Tagihan Bruto, Gross Amount due to from Customer

148
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Pihak-pihak Berelasi / Related Parties Transaksi Transactions

PT Dahana (Persero) Tagihan Bruto, Pendapatan Usaha Gross Amount due to from Customer, Revenues
Pokja Papua Tagihan Bruto, Pendapatan Usaha Gross Amount due to from Customer, Revenues
PT Perhubungan Nusantara Tagihan Bruto, Gross Amount due to from Customer
PT Jasa Marga Kualanamu Tol Tagihan Bruto, Piutang Usaha, Pendapatan Usaha, Investasi Assosiasi, Uang Muka Gross Amount due to from Customer, Accounts Receivable, Revenues, Investment in Associates,
Advance
PT Pengembangan Pariwisata Bali (Persero) Tagihan Bruto, Pendapatan Usaha Gross Amount due to from Customer, Revenues
PT Perusahaan Gas Negara Tagihan Bruto, Pendapatan Usaha Gross Amount due to from Customer, Revenues
PT Pejagan Pemalang Toll Road Tagihan Bruto, Pendapatan Usaha, Investasi Assosiasi Gross Amount due to from Customer, Revenues, Investment in Associates
PT Kresna Kusuma Dyandra Marga Tagihan Bruto, Pendapatan Usaha, Investasi Assosiasi Gross Amount due to from Customer, Revenues, Investment in Associates
KSO/JV Waskita Karya - Triniti Tagihan Bruto, Piutang Usaha, Pendapatan Usaha, Piutang Retensi, Uang Muka Gross Amount due to from Customer, Accounts Receivable, Revenues, Retention Receivable,
Advance
KSO/JV Kawahpejata Indonesia Tagihan Bruto, Piutang Usaha, Pendapatan Usaha Gross Amount due to from Customer, Accounts Receivable, Revenues
PT Prima Multi Terminal Tagihan Bruto, Pendapatan Usaha, Uang Muka, Investasi Assosiasi Gross Amount due to from Customer, Revenues, Advance, Investment in Associates
PT PAL Indonesia (Persero) Tagihan Bruto, Pendapatan Usaha Gross Amount due to from Customer, Revenues
PTPN III Tagihan Bruto, Pendapatan Usaha Gross Amount due to from Customer, Revenues
KSO/JV Waskita - Darmo Permai Tagihan Bruto, Pendapatan Usaha Gross Amount due to from Customer, Revenues
PT Pelindo II (Persero) Pendapatan Usaha Revenues
Pihak-pihak Berelasi / Related Parties Transaksi Transactions
PT Solo Ngawi Jaya Uang Muka, Investasi Assosiasi, Piutang Usaha Investment in Associates, Accounts Receivable,Advance
PT Cimanggis Cibitung Tol Piutang Usaha Accounts Receivable
KSO/JV Waskita - WIKA Pendapatan Usaha, Utang usaha Revenues, Accounts Payable
Waskita-PP-HK KSO Pendapatan Usaha Revenues
PT MNC Tol Investama Utang Lain-lain Other Receivable
PT Cinere Serpong Jaya Utang Lain-lain, Investasi Assosiasi, Other Receivable, Investment in Associates
PT Adhi Karya Utang Usaha Accounts Payable
PT Wika Beton Utang Usaha Accounts Payable
KSO/JV Waskita-BRP Pendapatan Usaha Revenues
PT Nindya Beton Utang Usaha Accounts Payable
Koperasi Waskita Utang Usaha Accounts Payable

Rincian item yang terkait dengan transaksi pihak-pihak The detail of items associated with the related
yang berelasi: parties transaction:

30 Juni 2017/ 31 Desember 2016/ 31 Maret 2017/ 31 Desember 2016/


Aset June 30, 2017 December 31, 2016 March 31, 2017 December 31, 2016 Assets
Rp Rp % %
Kas dan Setara kas 2,294,468,449,798 9,185,448,820,366 88082% 38091% Cash and Cash Equivalent
Piutang Usaha 1,092,313,308,051 1,150,165,994,134 76069% 4087% Accounts Receivable
Piutang Retensi 593,260,734,921 376,206,099,216 40089% 1059% Retention Receivables
Piutang Lain-lain 2,802,276,900,002 2,916,033,361,590 44088% 12035% Others Receivable
Tagihan Bruto 8,909,151,027,285 6,910,476,948,481 53085% 29027% Gross Amount due from to Customer
Aset Ventura Bersama 2,729,988,978 63,699,213,747 9070% 0027% Joint Ventures Assets

30 Juni 2017/ 31 Desember 2016/ 31 Maret 2017/ 31 Desember 2016/


Liabilitas June 30, 2017 December 31, 2016 March 31, 2017 December 31, 2016 Liabilities
Rp Rp % %
Utang Bank 120,000,000,000 10,801,762,825,928 70076% 45076% Bank Loan
Uang Muka Kontrak 65,438,946,061 219,672,160,581 15082% 0093% Advance on Contract

Persentase diatas merupakan perbandingan dengan Above percentage is a comparison with total
total aset. assets.

30 Juni 2017/ 30 Juni 2016/ 30 Juni 2017/ 30 Juni 2016/


June 30, 2017 June 30, 2016 June 30, 2017 June 30, 2016
Rp Rp % %
Pendapatan Usaha 3,997,389,222,151 3,984,320,737,056 386037% 385011% Revenue

149
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

53. PERJANJIAN 53. AGREEMENTS

Kontrak Konstruksi Construction Contract

Pada tanggal 30 Juni 2017, berikut perikatan dan As of June 30, 2017, following the details
perjanjian dalam rangka aktivitas konstruksi: commitments and agreement related to
construction activity:

Jangka Waktu/ Time Period


Nilai Kontrak/ Pemberi Kerja/ Mulai/ Selesai/ Keterangan/
No. Nama Proyek/ Project Name Nomor Kontrak/ Contract Number Contract Value Owner Start Finish Remark

Pekerjaan Pembangunan Jalan Bebas Hambatan & Tol Trans Sumatera 3 Ijin Direksi No.: 643/WK/DIR/2015, tanggal 15 Belum Jatuh Tempo/
1 2.400.000.000.000 PT Hutama Karya (HK) 16-Jun-15 16-Jun-17
Section Bakauheni - Terbanggi Besar Juni 2015 ; Not Due Yet
Ijin Direksi No.: 717.6/WK/DIR/2015, tanggal
Belum Jatuh Tempo/
2 Pembangunan The Reiz Condo (Residential) Di Medan 30 Juni 2015; SPK No.: 06/SPK/WKR/2015 425.623.000.000 PT Waskita Karya Realty (WKR) 30-Jun-15 30-Jun-17
Not Due Yet
tanggal 26 Mei 2015
Belum Jatuh Tempo/
3 Pekerjaan Design and Build Proyek The Frontage Surabaya 001/Kons/TGU/WK/A.Yani/IX/14 1.440.663.525.108 PT Trikarya Graha Utama 09-Sep-14 09-Sep-17
Not Due Yet
Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu (Becakayu) Belum Jatuh Tempo/
4 01/SPP-KKDM/XI/2014 1.167.705.617.273 PT Kresna Kusuma Dyandra Marga (KKDM) 28-Nov-14 28-Nov-17
Seksi 1 : Sta. 1+011 - Sta. 11 + 501 Not Due Yet
Paket Pekerjaan Lanjutan Pembangunan Pelabuhan Sisi Darat di Kabupaten Belum Jatuh Tempo/
5 027/788/DISHUBBUDPAR/XII/2014 264.486.363.636 DISHUBBUDPAR Kab. Penajam 17-Des-14 01-Des-17
Penajam Paser Utara (Multi Years) Not Due Yet
HK.02.03/SNVT-PJSA-NTT.II/PKSDA- Belum Jatuh Tempo/
6 Pembangunan Bendungan Raknamo di Kabupaten Kupang 646.009.581.818 Kemen PU-Dirjen SDA 04-Des-14 11-Feb-19
I/223/XI/2014 Not Due Yet
Ijin Direksi No.: 682/WK/DIR/2015, tanggal 24 Belum Jatuh Tempo/
7 Pembangunan Jalan Tol Solo - Ngawi Seksi SN. 1A 937.290.141.818 PT Solo Ngawi Jaya (SNJ) 30-Jun-15 30-Jun-17
Juni 2015; Not Due Yet
Ijin Direksi No.: 682/WK/DIR/2015, tanggal 24 Belum Jatuh Tempo/
8 Pembangunan Jalan Tol Solo - Ngawi Seksi SN. 1B 983.180.782.727 PT Solo Ngawi Jaya (SNJ) 30-Jun-15 30-Jun-17
Juni 2015; Not Due Yet
Ijin Direksi No.: 682/WK/DIR/2015, tanggal 24 Belum Jatuh Tempo/
9 Pembangunan Jalan Tol Solo - Ngawi Seksi SN. 2A 1.448.983.903.636 PT Solo Ngawi Jaya (SNJ) 30-Jun-15 30-Jun-17
Juni 2015; Not Due Yet
Ijin Direksi No.: 682/WK/DIR/2015, tanggal 24 Belum Jatuh Tempo/
10 Pembangunan Jalan Tol Solo - Ngawi Seksi SN. 2B 335.544.012.727 PT Solo Ngawi Jaya (SNJ) 30-Jun-15 30-Jun-17
Juni 2015; Not Due Yet
Ijin Direksi No.: 682/WK/DIR/2015, tanggal 24 Belum Jatuh Tempo/
11 Pembangunan Jalan Tol Solo - Kertosono Seksi NK. 1 1.373.067.663.636 PT Ngawi Kertosono Jaya (NKJ) 30-Jun-15 30-Jun-17
Juni 2015; Not Due Yet
Ijin Direksi No.: 682/WK/DIR/2015, tanggal 24 Belum Jatuh Tempo/
12 Pembangunan Jalan Tol Solo - Kertosono Seksi NK. 2 391.617.611.818 PT Ngawi Kertosono Jaya (NKJ) 30-Jun-15 30-Jun-17
Juni 2015; Not Due Yet
Ijin Direksi No.: 682/WK/DIR/2015, tanggal 24 Belum Jatuh Tempo/
13 Pembangunan Jalan Tol Solo - Kertosono Seksi NK. 3 990.315.945.455 PT Ngawi Kertosono Jaya (NKJ) 30-Jun-15 30-Jun-17
Juni 2015; Not Due Yet
Pembangunan jalan tol Cimanggis Cibitung Seksi I : STA. 23+900 - STA. Belum Jatuh Tempo/
14 01/ADD-1/KJP/CCT/2016 657.209.892.727 PT Cimanggis Cibitung Tollways (CCT) 09-Okt-15 19 Juli 2017
27+070 Not Due Yet
Belum Jatuh Tempo/
15 Paket 1 : Pengandaan Transmisi 500 KV Sumatera, New Aur Duri - Peranap 0532.PJ/DAN.02.02/DIR/2015 2.466.427.224.374 PT Perusahaan Listrik Negara (Persero) 29-Okt-15 28-Okt-18
Not Due Yet
Belum Jatuh Tempo/
16 Paket 2 : Pengandaan Transmisi 500 KV Sumatera, Peranap - Perawang 0533.PJ/DAN.02.02/DIR/2015 1.776.903.929.363 PT Perusahaan Listrik Negara (Persero) 29-Okt-15 28-Okt-18
Not Due Yet
Belum Jatuh Tempo/
17 Paket 1 : Pengandaan Transmisi 500 KV Sumatera, New Aur Duri - Peranap 0532.PJ/DAN.02.02/DIR/2015 589.360.579.805 PT Perusahaan Listrik Negara (Persero) 29-Okt-15 28-Okt-18
Not Due Yet
Belum Jatuh Tempo/
18 Paket 1 : Pengandaan Transmisi 500 KV Sumatera, New Aur Duri - Peranap 0532.PJ/DAN.02.02/DIR/2015 476.626.581.312 PT Perusahaan Listrik Negara (Persero) 29-Okt-15 28-Okt-18
Not Due Yet
Belum Jatuh Tempo/
19 Paket 2 : Pengandaan Transmisi 500 KV Sumatera, Peranap - Perawang 0533.PJ/DAN.02.02/DIR/2015 452.146.104.412 PT Perusahaan Listrik Negara (Persero) 29-Okt-15 28-Okt-18
Not Due Yet
Belum Jatuh Tempo/
20 Paket 2 : Pengandaan Transmisi 500 KV Sumatera, Peranap - Perawang 0533.PJ/DAN.02.02/DIR/2015 344.451.102.136 PT Perusahaan Listrik Negara (Persero) 29-Okt-15 28-Okt-18
Not Due Yet
Ijin Direksi No.: 1111/WK/DIR/2015, tanggal
Kementerian Perhubungan/ Belum Jatuh Tempo/
21 Pembangunan Light Rail Transit di Provinsi Sumatera Selatan (General) 13 November 2015; Perpres No. 116 Tahun 4.647.345.128.663 24-Nov-15 31-Des-17
Ministry of Transportation Not Due Yet
2015
Belum Jatuh Tempo/
22 Pekerjaan Pembangunan Jalan Tol Krian - Legundi - Bunder - Manyar 9/SPPJK/WBW/2016 1.863.300.112.983 PT Waskita Bumi Wira (WBW) 09-Des-16 08-Des-18
Not Due Yet
Belum Jatuh Tempo/
23 Pekerjaan Pembangunan Jalan Tol Krian - Legundi - Bunder - Manyar 9/SPPJK/WBW/2016 1.415.812.372.791 PT Waskita Bumi Wira (WBW) 09-Des-16 08-Des-18
Not Due Yet
Belum Jatuh Tempo/
24 Pekerjaan Pembangunan Jalan Tol Krian - Legundi - Bunder - Manyar 9/SPPJK/WBW/2016 3.607.023.760.426 PT Waskita Bumi Wira (WBW) 09-Des-16 08-Des-18
Not Due Yet

Proyek Pembangunan JalanTol Kayu Agung - Palembang - Betung Paket IV Belum Jatuh Tempo/
25 05/KONTRAKS2.S3-WK/2016 1.550.328.927.273 PT Sriwijaya Markmore Persada (SRIMP) 20-Des-16 34 Bulan
(Seksi 2 : Sta. 52+200 - 67+400 dan Seksi 3 : Sta. 67+400 s Sta. 96+000) Not Due Yet

Proyek Pembangunan JalanTol Kayu Agung - Palembang - Betung Paket IV Belum Jatuh Tempo/
26 05/KONTRAKS2.S3-WK/2016 975.638.029.962 PT Sriwijaya Markmore Persada (SRIMP) 20-Des-16 34 Bulan
(Seksi 2 : Sta. 52+200 - 67+400 dan Seksi 3 : Sta. 67+400 s Sta. 96+000) Not Due Yet

150
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Kontrak Konsesi Pengusahaan Jalan Tol/ Consession Toll Road Right Contract
Perusahaan/ Ruas Tol/ Mitra Kerja/ Isi Perjanjian/ Jangka Waktu/ Period
No
The Company Toll Section Partners Content of the Agreement Mulai/ Start Selesai/ Finish

1 PT Semesta Marga Kanci - Departemen Hak konsesi pengusahaan jalan tol selama 2006 2041
Raya (SMR) Pejagan Pekerjaan Umum 35 tahun/ Toll road concession rights for 35
years

2 PT Cimanggis Cimanggis - Menteri Pekerjaan Hak konsesi pengusahaan jalan tol selama 2007 2042
Cibitung Tollways Cibitung Umum 35 tahun/ Toll road concession rights for 35
(CCT) years

3 PT Pejagan Pejagan - Departemen Hak konsesi pengusahaan jalan tol selama 2014 2059
Pemalang Tol Road Pemalang Pekerjaan Umum 45 tahun/ Toll road concession rights for 45
(PPTR) years

4 PT Trans Jabar Tol Ciawi - Sukabumi Departemen Hak konsesi pengusahaan jalan tol selama 2008 2053
(TJT) Pekerjaan Umum 45 tahun/ Toll road concession rights for 45
years

5 PT Trans Jawa Pasuruan - Departemen Hak konsesi pengusahaan jalan tol selama 2015 2060
Paspro Jalan Tol Probolinggo Pekerjaan Umum 45 tahun/ Toll road concession rights for 45
(TJPJT) years

6 PT Pemalang Pemalang - Departemen Hak konsesi pengusahaan jalan tol selama 2017 2057
Batang Toll Road Batang Pekerjaan Umum 40 tahun/ Toll road concession rights for 40
(PBTR) years

7 PT Sriwijaya Kayu Agung - Departemen Hak konsesi pengusahaan jalan tol selama 2017 2062
Markmore Persada Palembang - Pekerjaan Umum 45 tahun/ Toll road concession rights for 45
(SRIMP) Betung years

8 PT Waskita Bumi Krian - Legundi - Departemen Hak konsesi pengusahaan jalan tol selama 2016 2061
Wira (WBW) Bunder - Manyar Pekerjaan Umum 45 tahun/ Toll road concession rights for 45
years

54. MANAJEMEN RISIKO KEUANGAN 54. FINANCIAL RISKS MANAGEMENT

Dalam pengelolaan keuangan, Grup telah melakukan In financial management, the Group has conducted
analisa risiko terhadap persaingan dan ketidakpastian risk analysis on competition and uncertainties that
yang dapat berpengaruh pada aset keuangan dan could affect the financial assets and financial
liabilitas keuangan sebagai berikut: liabilities as follows:

a. Klasifikasi Aset dan Liabilitas Keuangan a. Classification of Financial Assets and


Liabilities

Perbedaan nilai wajar dengan nilai tercatat pada The difference between the fair value and the
30 Juni 2017 dan 31 Desember 2016 tidak carrying value at June 30, 2017 and
signifikan. December 31, 2016 was not significant.
30 Juni 2017/ 31 Desember 2016/
June 30, 2017 December 31, 2016
Rp Rp
Aset Keuangan - Pinjaman yang Financial Assets-
diberikan dan Piutang Loan and Receivables
Kas dan Setara Kas 7,539,863,123,881 10,655,996,501,931 Cash and Equivalents
Investasi Jangka Pendek 11,098,200,000 8,448,200,000 Short-Term Investments
Piutang Usaha dan Retensi 4,613,745,703,205 5,284,157,681,656 Trade Receivable and Retension
Piutang Lain-lain 8,199,386,725,961 5,617,874,190,759 Other Receivables
Piutang Ventura Bersama 2,647,961,971,149 745,980,988,779 Joint Ventures Receivables
Tagihan Bruto kepada Pengguna Jasa 16,022,095,240,908 13,109,720,040,549 Gross Amount Due from Customers
Aset Keuangan yang Dimiliki Held to Maturity
Hingga Jatuh Tempo Financial Assets
Investasi Jangka Panjang Lainnya 227,622,000,000 548,404,046,393 Other Long-Term Investments
Jumlah 39,261,772,965,104 35,970,581,650,067 Total

Liabiltas Keuangan - Financial Liabilities-


Biaya perolehan diamortisasi Amortized cost
Utang Usaha 11,130,706,819,805 7,361,695,071,899 Accounts Payables
Utang Bruto Subkontraktor 7,128,105,013,779 7,291,439,066,228 Gross Amount Due to Third Parties
Utang Bank 21,390,449,313,770 16,210,935,910,430 Bank Loan
Utang Lembaga Keuangan Non-Bank 2,899,446,701,606 3,456,288,365,177 Loan to Financial Institution Non-Bank
Biaya yang Masih Harus Dibayar 341,045,743,524 251,300,717,225 Accrued Expenses
Utang Lain-lain 2,440,357,774,989 1,954,053,883,280 Other Payables - Long Term
Jumlah 45,330,111,367,473 36,525,713,014,239 Total

151
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

31 Maret 2017/ 31 Desember 2016/


March, 31 2017 December 31, 2016
Rp Rp
Total Liabilitas 55,030,150,882,233 44,659,793,617,499 Total Liabilities
Dikurang: Kas dan Setara Kas 7,539,863,123,881 10,655,996,501,931 Deduct: Cash and Cash Equivalents
Liabilitas Bersih 47,490,287,758,352 34,003,797,115,568 Net Liabilities
Total Ekuitas 20,871,515,110,726 16,773,218,556,948 Total Equity

Rasio Utang terhadap Modal 228% 203% Net Payables to Equity Ratio

b. Tujuan dan Kebijakan Manajemen Risiko b. Financial Risk Management Objectives and
Keuangan Policies

Bisnis Grup mencakup aktivitas pengambilan risiko The Group's business includes risk-taking
dengan sasaran tertentu dengan pengelolaan yang activities with specific objectives with
profesional. Fungsi utama dari manajemen risiko professional management. The main function
Grup adalah untuk mengidentifikasi seluruh risiko of the Group's risk management is to identify
kunci, mengukur risiko-risiko ini dan mengelola all key risks, measure these risks and manage
posisi risiko. Grup secara rutin menelaah kebijakan risk positions. The Group regularly reviews
dan sistem manajemen risiko untuk menyesuaikan policies and risk management system to
dengan perubahan di pasar, produk dan praktek adjust to changes in markets, products and
pasar terbaik. best market practices.

Grup mendefinisikan risiko keuangan sebagai The Group defines financial risk as the
kemungkinan kerugian atau laba yang hilang, yang possibility of loss or lost profit, caused by
disebabkan oleh faktor internal maupun faktor factors both internal and external factors that
eksternal yang berpotensi negatif terhadap potentially negative impact on achievement of
pencapaian tujuan Grup. Group goals.

Tujuan Grup dalam mengelola risiko keuangan The purpose of the Group in managing
adalah untuk mencapai keseimbangan yang sesuai financial risks is to achieve an appropriate
antara risiko dan tingkat pengembalian serta balance between risk and returns and
meminimalisasi potensi efek memburuknya kinerja minimize potential adverse effects of the
keuangan Grup. Group's financial performance.

Risiko keuangan utama yang dihadapi Grup adalah The main financial risks facing the Group is
risiko kredit, risiko suku bunga, risiko likuiditas, credit risk, interest rate risk, liquidity risk,
risiko nilai tukar mata uang asing dan risiko foreign currency exchange rates and the risk
perubahan kebijakan pemerintah, kondisi ekonomi of changes in government policy, socio-
dan sosial politik. Perhatian atas pengelolaan risiko economic and political conditions. Attention to
ini telah meningkat secara signifikan dengan risk management has increased significantly
mempertimbangan perubahan dan volatilitas pasar with the changes and consider the financial
keuangan di Indonesia dan internasional. market volatility in Indonesia and
internationally.

(i) Risiko Kredit (i) Credit Risk

Risiko kredit adalah kerugian yang timbul dari Credit risk is the loss arising from
pelanggan yang gagal memenuhi kewajiban customers who fail to meet their
kontraktual mereka. contractual obligations.

Instrumen keuangan Grup yang mempunyai The Group's financial instruments that
potensi atas risiko kredit terdiri dari kas dan have the potential for credit risk consist of
setara kas, piutang usaha, piutang retensi, cash and cash equivalents, accounts
tagihan bruto dan piutang lain-lain. Jumlah receivable, retention, gross amount due
eksposur risiko kredit maksimum sama dengan from customers and other receivables.
nilai tercatat atas akun-akun tersebut. Rincian Total maximum credit risk exposure equal
umur piutang usaha dapat dilihat pada Catatan to the carrying value of these accounts.
dalam laporan keuangan konsolidasian. Pada The aging of trade receivables can be
tanggal 31 Desember 2017 piutang usaha Grup seen on notes to Consolidated Financial
tidak terkonsentrasi pada pelanggan tertentu. Statements. On December 31, 2017
accounts receivable of the Group is not
concentrated on a particular customer.

152
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Grup mengelola risiko kredit dengan The Group manages credit risk by setting
menetapkan batasan jumlah risiko yang dapat limits the amount of acceptable risk for
diterima untuk masing-masing pelanggan dan each customer and be more selective in
lebih selektif dalam pemilihan bank dan institusi the choice of banks and financial
keuangan, yaitu hanya bank-bank dan institusi institutions, that is, only banks and
keuangan ternama dan yang berpredikat baik financial institutions are predicated famous
yang dipilih. and well chosen.

(ii) Risiko Suku Bunga (ii) Interest Rate Risk

Risiko tingkat bunga arus kas adalah risiko Cash flow interest rate risk is the risk that
dimana arus kas masa depan dari suatu future cash flows of a financial instrument
instrumen keuangan berfluktuasi karena fluctuate due to changes in market interest
perubahan suku bunga pasar. Grup memiliki rates. The Group has short-term loans with
pinjaman jangka pendek dengan bunga floating interest. The interest rate which is
mengambang. Tingkat suku bunga yang cukup quite high and occurs in sudden decrease
tinggi dan terjadi secara tiba-tiba dapat in income can affect the Group.
berpengaruh terhadap menurunnya laba Grup.

Berikut ini merupakan rincian dari liabilitas The following is a breakdown of financial
keuangan berdasarkan jenis tingkat suku liabilities based on the type of interest rate:
bunga:

30 Juni 2017/ 31 Desember 2016/


June 30, 2017 December 31, 2016
Rp Rp
Liabilitas Keuangan Financial Liabilities
Suku bunga mengambang 15,953,471,870,196 12,063,047,151,829 Floating Interest Rate

Dampak dari pergerakan suku bunga di pasar The impact of interest rate movements in
tidak signifikan. Grup mengelola risiko suku the market is not significant. The Group
bunga dan melalui pengawasan terhadap manages interest rate risk and through
dampak pergerakan suku bunga untuk monitoring of the impact of interest rate
meminimalisasi dampak negatif terhadap Grup. movements to minimize the negative
Grup akan mengawasi secara ketat pergerakan impact on the Company. The Company will
suku bunga dipasar dan apabila suku bunga closely monitor interest rate movements in
mengalami kenaikan yang signifikan maka Grup the market and when interest rates
akan menegosiasikan suku bunga tersebut increased significantly, and then the Group
dengan para lender. will negotiate the interest rates with the
lenders.

(iii) Risiko Likuiditas (iii) Liquidity Risk

Risiko likuiditas adalah risiko di mana posisi Liquidity risk is the risk in which the
arus kas menunjukkan pendapatan jangka positions of cash flows show short-term
pendek tidak cukup untuk menutupi revenues are not sufficient to cover short
pengeluaran jangka pendek. term expenses.

Eksposur risiko likuiditas berupa kesulitan Grup Liquidity risk is an exposure of the Group
dalam memenuhi kewajiban keuangan yang difficulties in meeting financial obligations
harus dibayar dengan kas atau aset keuangan that must be paid with cash or other
lainnya. Grup diharapkan dapat membayar financial assets. The Group is expected to
seluruh kewajibannya sesuai dengan jatuh pay all its obligations in accordance with
tempo kontraktual. Dalam memenuhi liabiltas contractual maturities. In fulfilling this
tersebut, maka Grup harus menghasilkan arus obligation, then the Group must generate
kas masuk yang cukup. sufficient cash inflows.

Berikut ini merupakan liabiltas keuangan non- These are non-derivative financial liabilities
derivatif berdasarkan nilai sisa jatuh tempo based on residual maturity value which
yang tidak didiskonto: was not discounted:

153
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

30 Juni 2017/ June 30, 2017


Jatuh Tempo/ Due Date
< 1 Tahun/ >1-2 Tahun/ >2-3 Tahun/ >3 Tahun/ Jumlah/ Biaya Emisi/ Nilai Tercatat/
< 1 Year >1-2 Years >2-3 Years >3 Years Total Issuance Costs Carrying Amount
Rp Rp Rp Rp Rp Rp Rp

Utang Usaha 10,590,860,013,273 -- -- -- 10,590,860,013,273 -- 10,590,860,013,273 Accounts Payable


Pinjaman Bank Jangka Pendek 10,793,113,881,994 -- -- -- 10,793,113,881,994 -- 10,793,113,881,994 Short Term Bank Loan
Liabilitas Jangka Pendek Lainnya 1,502,516,936,418 -- -- -- 1,502,516,936,418 -- 1,502,516,936,418 Other Short Term Liabilities
Jumlah Liabilitas Keuangan 22,886,490,831,685 -- -- -- 22,886,490,831,685 -- 22,886,490,831,685 Total Financial Liabilities

31 Desember 2016/ December 31, 2016


Jatuh Tempo/ Due Date
< 1 Tahun/ >1-2 Tahun/ >2-3 Tahun/ >3 Tahun/ Jumlah/ Biaya Emisi/ Nilai Tercatat/
< 1 Year >1-2 Years >2-3 Years >3 Years Total Issuance Costs Carrying Amount
Rp Rp Rp Rp Rp Rp Rp
Utang Usaha 7,361,695,071,899 -- -- -- 7,361,695,071,899 -- 7,361,695,071,899 Accounts Payable
Pinjaman Bank Jangka Pendek 12,063,047,151,829 -- -- -- 12,063,047,151,829 -- 12,063,047,151,829 Short Term Bank Loan
Liabilitas Jangka Pendek Lainnya 239,293,798,494 -- -- -- 239,293,798,494 -- 239,293,798,494 Other Short Term Liabilities
Jumlah Liabilitas Keuangan 19,664,036,022,222 -- -- -- 19,664,036,022,222 -- 19,664,036,022,222 Total Financial Liabilities

Grup mengelola risiko likuiditas dengan The Group manages liquidity risk by
mempertahankan kas dan setara kas yang maintaining cash and cash equivalents
mencukupi dalam memenuhi komitmen Grup sufficient to meet the commitments of the
untuk operasi normal dan secara rutin Group for normal operation and regularly
mengevaluasi proyeksi arus kas dan arus kas evaluates cash flow projections and actual
aktual, serta jadwal tanggal jatuh tempo aset cash flows, and the schedule date of
dan Liabilitas keuangan. maturity of assets and financial liabilities.

(iv) Risiko Nilai Tukar Mata Uang Asing (iv) Foreign Exchange Risk Foreign Currency

Eksposur risiko nilai tukar mata uang asing Risk exposure of foreign currency
merupakan bagian dari kegiatan operasi normal exchange rate is part of normal operations
Perusahaan dan cabang Luar Negeri. of the Company and the branches of
Foreign Affairs.

Dengan demikian pengaruh dari selisih nilai Thus the effect of foreign exchange
tukar mata uang asing tidak signifikan. currency differences is not significant.

(v) Risiko Perubahan Kebijakan Pemerintah, (v) Risk of Changes in Government Policy,
Kondisi Ekonomi dan Sosial Politik. Economic and Social Politics.

Kebijakan pemerintah baik yang menyangkut Government policies concerning economic


ekonomi dan moneter, serta kondisi sosial dan and monetary, and social and political
politik yang kurang kondusif akan berakibat conditions that are less conducive to result
menurunnya investasi dan pembangunan. Hal in decreased investment and development.
ini dapat mengakibatkan tertundanya proyek- This can lead to delays in projects that
proyek yang telah maupun akan diperoleh have been or will be acquired by the
Grup. Group.

Risiko ini merupakan risiko yang bersifat This risk is systemic risk whereby if this
sistemik dimana bila risiko ini terjadi maka akan happens then the risk will negatively affect
mempengaruhi secara negatif seluruh variable all the variables involved, this make the
yang terlibat, sehingga membuat kinerja Grup performance of the Group decrease. The
menurun risiko ini bahkan diversifikasi pun risk diversification is not even able to
belum mampu menghilangkan risiko ini. eliminate this risk.

c. Manajemen Risiko Modal c. Capital Risk Management Policy

Tujuan dari Grup dalam mengelola permodalan The purpose of the Group in managing capital
adalah untuk melindungi kemampuan entitas dalam is to protect the ability of the entity in
mempertahankan kelangsungan usaha, sehingga maintaining business continuity, so entity can
entitas dapat tetap memberikan hasil bagi still deliver results for shareholders and
pemegang saham dan manfaat bagi pemangku benefits for other stakeholders, and to provide

154
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

kepentingan lainnya, dan untuk memberikan imbal adequate returns to shareholders by pricing
hasil yang memadai kepada pemegang saham products and services that are commensurate
dengan menentukan harga produk dan jasa yang with the level of risk.
sepadan dengan tingkat risiko.

Grup menetapkan sejumlah modal sesuai proporsi The Group set a number of capital in
terhadap risiko. Grup mengelola struktur modal dan proportion to the risk. The Group manage its
membuat penyesuaian dengan memperhatikan capital structure and makes adjustments
perubahan kondisi ekonomi dan karakteristik risiko taking into account changes in economic
aset yang mendasari. conditions and risk characteristics of the
underlying asset.

Konsisten dengan perusahaan lain dalam industri, Consistent with other companies in the
Grup memonitor modal dengan dasar rasio utang industry, the Group monitors capital on the
terhadap modal yang disesuaikan. Rasio ini dihitung basis of the debt ratio of to adjusted capital.
sebagai berikut: utang neto dibagi modal yang This ratio is calculated as follows: net debt
disesuaikan. Utang neto merupakan total utang divided by adjusted capital. Net debt is total
(sebagaimana jumlah dalam laporan posisi debt (as the amount in the statement of
keuangan) dikurangi kas dan setara kas. financial position) less cash and cash
equivalents.

Ditahun 2017, strategi Grup untuk mempertahankan During the year 2017, the Group's strategy is to
rasio utang terhadap modal yang disesuaikan pada maintain ratio of the debt to adjusted capital at
batas bawah dari kisaran 4,93. Rasio utang terhadap the lower limit with the range of 4.93. Debt ratio to
modal yang disesuaikan pada 30 Juni 2017 dan capital as of June 30, 2017 and December 31,
31 Desember 2016 adalah sebagai berikut: 2016 are as follows:

31 Maret 2017/ 31 Desember 2016/


March, 31 2017 December 31, 2016
Rp Rp
Total Liabilitas 55,030,150,882,233 44,659,793,617,499 Total Liabilities
Dikurang: Kas dan Setara Kas 7,539,863,123,881 10,655,996,501,931 Deduct: Cash and Cash Equivalents
Liabilitas Bersih 47,490,287,758,352 34,003,797,115,568 Net Liabilities
Total Ekuitas 20,871,515,110,726 16,773,218,556,948 Total Equity

Rasio Utang terhadap Modal 228% 203% Net Payables to Equity Ratio

55. KOMITMEN DAN KONTIJENSI 55. COMMITMENT AND CONTINGENCY

Perusahaan The Company

Berdasarkan Perjanjian Pemesanan Material Besi Based on the Order of Concrete Iron Material
Beton Perusahaan dengan PT The Master Steel Ordering on the Company with PT Master Steel
Manufactory dengan perjanjian No. 46/SPPM/WK/D.II/ Manufactory with agreement No. 46/SPPM/WK/D.II/
2016 dengan nilai jual beli material dihitung dari 2016, the purchase value of the material is
volume dan harga satuan senilai Rp 30.250.000.000 calculate from volume and unit price of Rp
(termasuk PPN) dengan jangka waktu pengadaan 30,250,000,000 (including VAT) with the
sampai dengan 30 Juni 2017. Cara pembayaran procurement period up to June 30, 2017.
berupa uang muka sebesar 20% dari nilai jual beli The method of payment is 20% down payment
sebesar Rp 5.500.000.000 (tidak termasuk PPN), from the sales and purchases value of
pembayaran selanjutnya sebesar Rp 22.000.000.000, Rp 5,500,000,000 (excluding VAT), the
dimana akan diterbitkan Surat Kredit Berdokumen subsequent payment of Rp 22,000,000,000 which
Dalam Negeri (SKBDN). Untuk pencairan SKBDN will be issued Letter of Credit Documented
dilakukan secara bertahap sesuai dengan progress Domestic (SKBDN). For disbursement of SKBDN
material diterima dilapangan dan dipotong secara shall be made in stages in accordance with the
proposional dengan melampirkan Berita Acara progress of material received in the field and
Penerimaan Material (BAPM) dan Berita Acara deducted proportionally by attaching the Minutes
Pembayaran (BAP). Receipt of Materials (BAPM) and Payment
Proceeds (BAP).

155
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Entitas Anak, PT Waskita Karya Energy (WKE) dan Subsidiaries, PT Waskita Karya Energy (WKE)
PT Waskita Sangir Energy (WSE) and PT Waskita Sangir Energy (WSE)

WKE dan WSE menandatangani Perjanjian Jual Beli WKE and WSE entered into a Power Purchase
Listrik (PJBL) pada tanggal 23 Maret 2015 dengan Agreement (PPA) on March 23, 2015 with the
perusahaan listrik milik negara, PT Perusahaan Listrik Indonesian state-owned electricity company, PT
Negara (Persero) Tbk (PLN). Berdasarkan ketentuan Perusahaan Listrik Negara (Persero) Tbk (PLN).
PPA, PLN telah berkomitmen untuk membeli kapasitas Under the terms of the PPA, PLN has committed
pembangkit listrik WKE dan WSE dan seluruh hasil to purchase the available capacity of the WKE dan
listrik selama dua puluh tahun sampai 2036. WSE’s power stations and all generation of
electricity for a period of twenty years until 2036.

WKE dan WSE telah membangun, memiliki dan WKE and WSE has build, owned and operated
mengoperasikan fasilitas pabrik yang berlokasi the plant facilities at site which is located at South
di Solok Selatan, Sumatera Barat. Solok, West Sumatera.

Setelah beroperasi secara komersial dalam Proyek, Upon commercial operation of the Project, WKE
WKE dan WSE berkewajiban menyediakan kepada dan WSE is obligated to make available to PLN the
PLN keluaran listrik bersih dari fasilitas Proyek, yang net electrical output of the Project's plant facilities,
akan dibeli oleh PLN pada jumlah yang ditentukan which will be purchased by PLN at amounts
berdasarkan formula yang tercantum dalam PJBL. determined under formula set forth in the PPA.
Jumlah yang harus dibayar oleh PLN adalah jumal The amounts to be paid by PLN for the purchase
keluaran listrik bersih yang dihasilkan. Jangka waktu of net electrical output. The term of the PPA
PPA dimulai pada tanggal 9 Desember 2016 dan akan commenced on December 9, 2016 and will expire
berakhir pada tanggal 9 Desember 2036, kecuali on December 9, 2036, unless terminated earlier in
diakhiri lebih awal sesuai dengan ketentuan PJBL, accordance with the terms of the PPA, as
sebagaimana telah diubah. amended.

PLN memiliki opsi untuk membeli hak, kepemilikan, dan PLN has an option to purchase the WKE dan WSE's
kepentingan WKE dan WSE dalam proyek dengan nilai right, title and interest in the project for a
terminasi berdasarkan formula tertentu yang tercantum termination value based on a certain formula set
dalam PPA. Harga beli yang harus dibayar oleh PLN, forth in the PPA. The purchase price to be paid by
dalam hal PLN melakukan opsi pembelian, mengalami PLN, in case PLN exercises the purchase option,
penururunan seiring menjelang berakhirnya PJBL. decreases as the end of the PPA approaches.

Pada tanggal 1 Juni 2016, WKE dan WSE dan PLN On June 1, 2016, WKE and WSE and PLN
menandatangani Amandemen Perjanjian Jual Beli entered into the Amendment to Power Purchase
Listrik (PJBL). Di bawah PJBL, kedua belah pihak Agreement (PPA). Under the PPA, both parties
sepakat untuk mengubah hal-hal tertentu dari PJBL agreed to amend certain matters of the original
awal. PPA.

Entitas Anak, PT Waskita Karya Realty (WKR) Subsidiary, PT Waskita Karya Realty (WKR)

Dalam rangka melakukan kegiatan usaha, WKR In connection with its operations, WKR entered into
memiliki perjanjian-perjanjian penting. Perjanjian dan significant agreements. The outstanding
ikatan penting yang masih berlaku sampai dengan significant agreements and commitments applied
tanggal 30 Juni 2017 adalah sebagai berikut: until June 30, 2017 are as follows:

Berdasarkan Akta No. 2 tanggal 24 Maret 2016, WKR Based on the Deed No. 2 dated March 24, 2016,
mengadakan perjanjian manajemen dengan PT Dafam WKR entered into management agreement with
Hotel Management (Operator). Berdasarkan perjanjian PT Dafam Hotel Management (the Operator).
tersebut, PT Dafam Hotel Management Based on agreement, PT Dafam Hotel
bertanggungjawab sebagai operator atas Hotel Dafam Management responsible as operator Hotel
Teraskita milik WKR. Dafam Teraskita owned by WKR.

Jangka waktu perjanjian adalah 10 (sepuluh) tahun The period of the agreement is 10 (ten) years
sejak ditandatanganinya perjanjian. Perjanjian ini since the signing date of this agreement. This
dapat diperpanjang jika disetujui oleh kedua belah agreement could be renewed if agreed upon by
pihak paling lambat 90 hari kerja sebelum tanggal both parties at least 90 working days before the
berakhirnya. expiration date.

156
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

PT Dafam Hotel Management sebagai Operator berhak PT Dafam Hotel Management as Operator entitled
menerima: to receive:

1. Technical Assistant Fee sebesar Rp 600.000.000 1. Technical Assistant Fee amounting to


yang sudah dibayarkan lunas seluruhnya oleh WKR Rp 600,000,000 which has been fully paid by
kepada PT Dafam Hotel Management berdasarkan WKR to PT Dafam Hotel Management based
Nota Kesepahaman No. 02/MOU/ WKR/V/2015 on Memorandum of Understanding
tanggal 26 Mei 2015 yang telah ditandatangani No. 02/MOU/WKR/V/2015 dated May 26,
sebelumnya oleh kedua belah pihak. 2015 which has been signed by both parties.

2. Base fee sebesar 2% pada tahun pertama dan 2. Base fee of 2% for first year and 2,5% for
2,5% di tahun-tahun berikutnya dari Total following years from of Total Operating
Pendapatan Operasional. Revenue.

3. Incentive Fee berdasarkan tinggi rendahnya Gross 3. Incentive Fee based on high and low of Gross
Operating Profit (GOP) : Operating Profit (“GOP”) :

a. % dari GOP apabila GOP kurang dari 35% dari a. % of GOP if GOP less than 35% of Total
Pendapatan Hotel Total; Revenue Hotel;
b. 5% dari GOP apabila GOP lebih dari 35% dan b. 5% of GOP if GOP more than 35% and
kurang dari atau sama dengan 45% dari less than or equivalent with 45% of Total
Pendapatan Hotel Total; dan Revenue Hotel;
c. 7% dari GOP apabila GOP lebih dari 45% dari c. 7% of GOP if GOP more than 45% of Total
Pendapatan Hotel Total. Revenue Hotel.

4. Sales and Marketing Fee adalah 1% dari 4. Sales and Marketing Fee are 1% of Gross
Pendapatan Kotor kamar per bulan. Revenue Room per month.
Perjanjian Kerja Sama Operasi (KSO) dengan Joint Venture Agreement with PT Asiana
PT Asiana Senopati Senopati

Pada tanggal 25 Juni 2015, Perusahaan On June 25, 2015 the Company entered into joint
menandatangani kontrak perjanjian KSO No. 40 venture agreement No. 40 with PT Asiana
dengan PT Asiana Senopati dalam rangka Senopati in order to develop 5,453m2 land areas
pengembangan tanah seluas 5.453m2 yang terletak di at Jalan Senopati Dalam RT 02/RW 03, Senayan,
Jalan Senopati Dalam RT 02/RW 03, kelurahan Kebayoran Baru. The agreement terminates when
Senayan, kecamatan Kebayoran Baru. Perjanjian ini the execution of the joint venture’s project work
berakhir apabila pelaksanaan pekerjaan proyek KSO has been complete demonstrated with the
telah selesai dengan dibuktikannya telah habisnya expiration of the maintenance work of the
masa pemeliharaan pekerjaan kontraktor dan KSO, contractor and joint venture, as well as all rights
serta seluruh hak dan kewajiban antara KSO dengan and obligations between the joint venture and a
pembeli, pihak ketiga, Instansi Pemerintah yang terkait buyer, a third party, government agencies which
dan berwenang dalam rangka pelaksanaan dan concerned and the competent in the
penyelesaian KSO telah terpenuhi semuanya tanpa implementation anbuad completion of the joint
menimbulkan tunggakan kewajiban. venture has been fulfilled without arising any
obligation.

Komposisi penyertaan saham terdiri dari PT Waskita The composition of shareholders consists of
Karya Realty (WKR) sebesar 51% dan PT Asiana PT Waskita Karya Realty (WKR) at 51% and
Senopati sebesar 49%, dengan modal awal sebesar PT Asiana Senopati at 49%, with an initial capital
Rp 603.345.343.137. of Rp 603,345,343,137.

Perjanjian KSO dengan PT Perintis Triniti Properti Joint Venture Agreement with PT Perintis
Triniti Properti

Pada tanggal 26 Mei 2015, Perusahaan menandatangani As of May 26, 2015 the Company entered into
kontrak perjanjian KSO No. 166 dengan PT Perintis Triniti KSO agreement No. 166 with PT Perintis Triniti
Properti dan PT Perintis Trusmi Properti dalam rangka Properti dan PT Perinti Trusmi Properti in order to
pengembangan tanah seluas 5.000m2 yang terletak di develop 5,000m2 land areas at Jalan Sutera
Jalan Sutera Boulevard, Alam Sutera, Tangerang. Boulevard, Alam Sutera, Tangerang. The
Perjanjian ini berakhir apabila pelaksanaan pekerjaan agreement terminates when the execution of the
proyek KSO telah selesai dengan dibuktikannya telah joint venture’s project work has been completed
habisnya masa pemeliharaan pekerjaan kontraktor dan demonstrated with the expiration of the
KSO, serta seluruh hak dan kewajiban antara KSO maintenance work of the contractor and joint
dengan pembeli, pihak ketiga, Instansi Pemerintah yang venture, as well as all rights and obligations
terkait dan berwenang dalam rangka pelaksanaan dan between the joint venture and a buyer, a third

157
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

penyelesaian KSO telah terpenuhi semuanya tanpa party, government agencies which concerned and
menimbulkan tunggakan kewajiban. the competent in the implementation and
completion of the joint venture has been fulfilled
without arising any obligation.

Komposisi penyertaan saham terdiri dari PT Waskita The composition of shareholders consists of
Karya Realty sebesar 40,8%, PT Perintis Triniti Properti PT Waskita Karya Realty at 40.8%, PT Perintis
sebesar 39,2%, dan PT Perintis Trusmi Properti Properti Triniti at 39.2%, and PT Perintis Trusmi
sebesar 20% dengan modal awal sebesar Properti at 20% with an initial capital of
Rp 125.000.000.000. Rp 125,000,000,000.

Pada tanggal 30 Oktober 2015, terdapat pembaharuan In October 30, 2015, there is a renewal of the
perjanjian KSO Waskita Triniti II. Disepakati bahwa KSO Waskita Triniti II agreement. It was agreed
posisi PT Waskita Triniti Properti digantikan oleh that the position PT Waskita Triniti Properti
PT Sirius Terang Cemerlang. Seluruh hak dan replaced by PT Sirius Terang Cemerlang. All
kewajiban PT Waskita Triniti Properti dialihkan kepada rights and obligations of PT Waskita Triniti
PT Sirius Terang Cemerlang. Properti had been transferred to PT Sirius Terang
Cemerlang.

Berdasarkan Akta No. 9 tanggal 3 Oktober 2016, Based on the Deed No. 9 dated October 3, 2016,
terdapat perubahan perjanjian KSO Waskita Triniti II there is a change of the KSO Waskita Triniti II
yang berisi komposisi penyertaan saham yang baru, agreement which contains the composition of
yaitu PT Waskita Karya Realty sebesar 50,8% atau investments in new shares, namely PT Waskita
senilai Rp 69.646.800.000 dan PT Sirius Terang Karya Realty of 50.8% or equivalent
Cemerlang sebesar 49,2% atau senilai Rp 69,646,800,000 and PT Sirius Terang
Rp 67.453.200.000. Cemerlang by 49.2% or equivalent
Rp 67,453,200,000.

Perjanjian KSO dengan PT Asiana Senopati Joint Venture Agreement with PT Asiana
Senopati

Pada tanggal 25 Juni 2015, Perusahaan On June 25, 2015 the Company entered into joint
menandatangani kontrak perjanjian KSO No. 40 venture agreement No. 40 with PT Asiana
dengan PT Asiana Senopati dalam rangka Senopati in order to develop 5,453m2 land areas
pengembangan tanah seluas 5.453m2 yang terletak di at Jalan Senopati Dalam RT 02/RW 03, Senayan,
Jalan Senopati Dalam RT 02/RW 03, kelurahan Kebayoran Baru. The agreement terminates when
Senayan, kecamatan Kebayoran Baru. Perjanjian ini the execution of the joint venture’s project work
berakhir apabila pelaksanaan pekerjaan proyek KSO has been complete demonstrated with the
telah selesai dengan dibuktikannya telah habisnya expiration of the maintenance work of the
masa pemeliharaan pekerjaan kontraktor dan KSO, contractor and joint venture, as well as all rights
serta seluruh hak dan kewajiban antara KSO dengan and obligations between the joint venture and a
pembeli, pihak ketiga, Instansi Pemerintah yang terkait buyer, a third party, government agencies which
dan berwenang dalam rangka pelaksanaan dan concerned and the competent in the
penyelesaian KSO telah terpenuhi semuanya tanpa implementation and completion of the joint
menimbulkan tunggakan kewajiban. venture has been fulfilled without arising any
obligation.

Komposisi penyertaan saham terdiri dari PT Waskita The composition of shareholders consists of
Karya Realty sebesar 51% dan PT Asiana Senopati PT Waskita Karya Realty at 51% and PT Asiana
sebesar 49%, dengan modal awal sebesar Senopati at 49%, with an initial capital of
Rp 603.345.343.137. Rp 603,345,343,137.

Perjanjian KSO dengan PT Darmo Permai Joint Venture Agreement with PT Darmo
Permai

Pada tanggal 21 Mei 2014, Perusahaan As of May 21, 2014 the Company entered into
menandatangani kontrak perjanjian KSO No. 6 dengan KSO agreement No. 6 with PT Darmo Permai in
PT Darmo Permai dalam rangka pengembangan tanah order to develop 34,089m2 land areas at Segi 8
seluas 34.089m2 yang terletak di Segi 8 Darmo Jalan Darmo Jalan Raya Darmo Permai III, Surabaya
Raya Darmo Permai III, Surabaya Barat. Perjanjian ini Barat. The agreement terminates when the
berakhir apabila pelaksanaan pekerjaan proyek KSO execution of the joint venture’s project work has
telah selesai dengan dibuktikannya telah habisnya been completed demonstrated with the expiration
masa pemeliharaan pekerjaan kontraktor dan KSO, of the maintenance work of the contractor and
serta seluruh hak dan kewajiban antara KSO dengan joint venture, as well as all rights and obligations

158
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

pembeli, pihak ketiga, Instansi Pemerintah yang terkait between the joint venture and a buyer, a third
dan berwenang dalam rangka pelaksanaan dan party, government agencies which concerned and
penyelesaian KSO telah terpenuhi semuanya tanpa the competent in the implementation and
menimbulkan tunggakan kewajiban. completion of the joint venture has been fulfilled
without arising any obligation.

Komposisi penyertaan saham terdiri dari PT Waskita The composition of shareholders consists of
Karya Realty sebesar 51%, PT Darmo Permai sebesar PT Waskita Realty at 51%, PT Darmo Permai at
49% dengan modal awal sebesar Rp 426.112.500.000. 49% with an initial capital of Rp 426,112,500,000.

Perjanjian KSO dengan PT Dawala Paralia Joint Venture Agreement with PT Dawala
Paralia

Pada tanggal 5 Mei 2015, Perusahaan menandatangani As of May 5, 2015 the Company entered into KSO
kontrak perjanjian KSO No. 2 dengan PT Dalawa agreement No. 2 with PT Dalawa Paralia Lepang
Paralia Lepang dalam rangka pengembangan tanah in order to develop 29.020m2 land areas at
seluas 29.020m2 yang terletak di Kelurahan Gelgel, Kelurahan Gelgel, Kabupaten Klungkung, Bali.
Kabupaten Klungkung, Bali. Perjanjian ini berakhir The agreement terminates when the execution of
apabila pelaksanaan pekerjaan proyek KSO telah the joint venture’s project work has been
selesai dengan dibuktikannya telah habisnya masa completed demonstrated with the expiration of the
pemeliharaan pekerjaan kontraktor dan KSO, serta maintenance work of the contractor and joint
seluruh hak dan kewajiban antara KSO dengan pembeli, venture, as well as all rights and obligations
pihak ketiga, Instansi Pemerintah yang terkait dan between the joint venture and a buyer, a third
berwenang dalam rangka pelaksanaan dan party, government agencies which concerned and
penyelesaian KSO telah terpenuhi semuanya tanpa the competent in the implementation and
menimbulkan tunggakan kewajiban. completion of the joint venture has been fulfilled
without arising any obligation.

Komposisi penyertaan saham di dalam KSO Waskita The composition of the shareholder in the Waskita
Dalawa terdiri dari PT Waskita Karya Realty sebesar Dalawa joint venture consists of PT Waskita
51%, PT Dalawa Paralia Lepang sebesar 49% dengan Karya Realty at 51%, PT Dalawa Paralia Lepang
modal awal sebesar Rp 116.080.000.000. at 49% with an initial capital of Rp
116,080,000,000.

Perjanjian KSO dengan PT Graha Jasa Ekatama Joint Venture Agreement with PT Graha Jasa
Ekatama

Pada tanggal 6 Juni 2016, Perusahaan As of June 6, 2016 the Company entered into
menandatangani kontrak perjanjian KSO No. 17 KSO agreement No. 17 with PT Graha Jasa
dengan PT Graha Jasa Ekatama dalam rangka Ekatama in order to develop 11,090m2 at Pejaten
pengembangan tanah seluas 11.090m2 di Pejaten Barat, Jakarta Selatan. The agreement terminates
Barat, Jakarta Selatan. Perjanjian ini berakhir apabila when the execution of the joint venture’s project
pelaksanaan pekerjaan proyek KSO telah selesai work has been completed demonstrated with the
dengan dibuktikannya telah habisnya masa expiration of the maintenance work of the
pemeliharaan pekerjaan kontraktor dan KSO, serta contractor and joint venture, as well as all rights
seluruh hak dan kewajiban antara KSO dengan and obligations between the joint venture and a
pembeli, pihak ketiga, Instansi Pemerintah yang terkait buyer, a third party, government agencies which
dan berwenang dalam rangka pelaksanaan dan concerned and the competent in the
penyelesaian KSO telah terpenuhi semuanya tanpa implementation and completion of the joint
menimbulkan tunggakan kewajiban. Komposisi venture has been fulfilled without arising any
penyertaan saham di dalam KSO Waskita Ekatama obligation. The composition of the shareholder in
terdiri dari PT Waskita Karya Realty sebesar 60%, the Waskita Ekatama joint venture consists of
PT Graha Jasa Ekatama sebesar 40% dengan modal PT Waskita Karya Realty at 60%, PT Graha Jasa
awal sebesar Rp 331.000.000.000. Ekatama at 40% with initial capital of
Rp 331,000,000,000.

Perjanjian KSO dengan PT Rajawali Nusantara Joint Venture Agreement with PT Rajawali
Indonesia Nusantara Indonesia

Pada tanggal 10 Oktober 2016, Perusahaan As of October 10, 2016 the Company entered into
menandatangani kontrak perjanjian KSO No. 2079 KSO agreement No. 2079 with PT Rajawali
dengan PT Rajawali Nusantara Indonesia dalam rangka Nusantara Indonesia in order to develop 7,025m2
pengembangan tanah seluas 7.025m2 di Jalan MT. at Jalan MT. Haryono Kav 12-13, Jakarta Timur.

159
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

Haryono Kav 12-13, Jakarta Timur. Jangka waktu The operating periods is valid for 48 months and
operasi berlaku selama 48 bulan dan perjanjian ini the agreement terminates when the execution of
berakhir apabila pelaksanaan pekerjaan proyek KSO the joint venture’s project work has been
telah selesai dengan dibuktikannya telah habisnya completed demonstrated with the expiration of the
masa pemeliharaan pekerjaan kontraktor dan KSO, maintenance work of the contractor and joint
serta seluruh hak dan kewajiban antara KSO dengan venture, as well as all rights and obligations
pembeli, pihak ketiga, Instansi Pemerintah yang terkait between the joint venture and a buyer, a third
dan berwenang dalam rangka pelaksanaan dan party, government agencies which concerned and
penyelesaian KSO telah terpenuhi semuanya tanpa the competent in the implementation and
menimbulkan tunggakan kewajiban. completion of the joint venture has been fulfilled
without arising any obligation.
Komposisi penyertaan modal di dalam KSO RNI – The composition of the capital investment in the
Waskita terdiri dari PT Rajawali Nusantara Indonesia KSO RNI - Waskita consists of PT Rajawali
berupa tanah seluas 7.052m2, dan WKR berupa modal Nusantara Indonesia with land areas of 7,052m2
kerja awal sebesar Rp 361.912.928.457. and WKR with initial capital of
Rp 361,912,928,457.

Pada akhir periode perjanjian KSO, PT Rajawali At the end of joint venture agreement,
Nusantara Indonesia akan menerima bagi hasil sebesar PT Rajawali Nusantara Indonesia will receive
Rp 367.544.705.882. profit sharing amounting to Rp 367,544,705,882.

56. PENGKLASIFIKASIAN KEMBALI LAPORAN 56. RECLASSIFICATION OF CONSOLIDATED


KEUANGAN INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS

Saldo akun-akun tertentu pada laporan posisi keuangan Certain account balances in the consolidated
interim konsolidasian tanggal 31 Desember 2016 telah statement of interim financial position as of
direklasifikasi untuk disesuaikan dengan penyajian pada December 31, 2016 were reclassified to conform
laporan posisi keuangan interim konsolidasian 30 Juni with the statement of 2017 consolidated interim
2017, sebagai berikut: financial position presentation as of June 30,
2017, as follows:

31 Desember 2016/ December 31, 2016


Sebelum direklasifikasi Setelah direkalsifikasi
kembali/ kembali/
Before reclassifications Reklasifikasi/ After reclassifications
2016 Reclassification 2016
Rp Rp Rp

LAPORAN POSISI KEUANGAN CONSOLIDATED INTERIM STATEMENTS


INTERIM KONSOLIDASIAN OF FINANCIAL POSITION
ASET LANCAR CURRENT ASSETS
Kas dan Setara Kas 10.653.780.768.186 2.215.733.745 10.655.996.501.931 Cash and Cash Equivalents
Investasi Jangka Pendek 10.663.933.745 (2.215.733.745) 8.448.200.000 Short-Term Investments
Piutang Usaha - Bersih Accounts Receivable - Net
Pihak Berelasi 1.356.258.910.298 2.078.953.217.468 3.435.212.127.766 Related Parties
Piutang Ventura Bersama - 745.980.988.779 745.980.988.779 Joint Ventures Receivables

ASET TIDAK LANCAR NON-CURRENT ASSETS


Piutang Usaha Tidak Lancar Long-Term Accounts Receivable
Pihak berelasi 3.004.936.546.247 (2.824.934.206.247) 180.002.340.000 Related Parties
Aset Pajak Tangguhan 187.307.694.607 7.830.452.417 195.138.147.024 Deferred Tax Assets

LIABILITAS JANGKA PENDEK CURRENT LIABILITIES


Biaya yang Masih Harus Dibayar 339.496.785.106 88.196.067.881 251.300.717.225 Accrued Expenses
Utang Bruto Subkontraktor Gross Amount Due to Subcontractors
Pihak Berelasi - (341.532.562.819) 341.532.562.819 Related Parties
Pihak Ketiga 7.291.439.066.228 341.532.562.819 6.949.906.503.409 Third Parties
Uang Muka Kontrak Jangka Pendek 469.063.906.539 (88.196.067.881) 557.259.974.420 Advances on Short-Term Contract

LIABILITAS JANGKA PANJANG NON-CURRENT LIABILITIES


Liabilitas Pajak Tangguhan 780.510.744 (7.830.452.417) 8.610.963.161 Deferred Tax Liabilities

160
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
INTERIM KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2017 DAN 31 DESEMBER 2016 AS OF JUNE 30, 2017 AND DECEMBER 31, 2016
DAN UNTUK PERIODE-PERIODE ENAM BULAN AND FOR THE SIX-MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2017 DAN 2016 ENDED JUNE 30, 2017 AND 2016
Lanjutan Continued

57. TANGGUNG JAWAB MANAJEMEN DAN 57. MANAGEMENT RESPONSIBILITY AND


PERSETUJUAN ATAS LAPORAN KEUANGAN APPROVAL OF THE CONSOLIDATED INTERIM
INTERIM KONSOLIDASIAN FINANCIAL STATEMENTS

Penyusunan dan penyajian wajar laporan keuangan The preparation and fair presentation of
interim konsolidasian dari halaman 1 sampai 161 the consolidated interim financial statements on
merupakan tanggung jawab manejemen, dan telah pages 1 to 161 were the responsibilities of
disetujui oleh Direktur untuk diterbitkan pada tanggal the management, and were approved by
14 Juli 2017. the Directors and authorized for issue on July 14,
2017.

*******

161

Anda mungkin juga menyukai