Anda di halaman 1dari 201

PERUSAHAAN PERSEROAN (PERSERO)

PT PERUSAHAAN LISTRIK NEGARA


DAN ENTITAS ANAK/AND SUBSIDIARIES

LAPORAN KEUANGAN KONSOLIDASIAN/


CONSOLIDATED FINANCIAL STATEMENTS

30 JUNI 2023 DAN 31 DESEMBER 2022/


JUNE 30, 2023 AND DECEMBER 31, 2022
*PLN
SURAT PERNYATAAN DIREKSI D'RECIORS' ST'IEMEIVI LETIER
TENTANG TANGCUT.IG JAWAE REI'I/A/G TO IHE RESPOflS/8/L'TY
ATAS LAPORAN XEUANGAN XONSOLIOASIAN INTERII' O IHE COIJSOTIDAIED FINANaAL SIAIEMENIS
PAOA TANGGAL 30 JUNI M23 DAN 31 OESEMBER 2022 'T./IERIM
AS OF JUNE 30, 2W3 AND DECEMBER 31 , 2022
SERTA UNN'K PERIooE ENAM zuLAN YANG BERAXHIR AND FOR THE SIX.IIONTH PER'ODS E OED
PAOA TANGGAL 30 JUNI 2023 DAN M2 JUNE &.2023 AND 2022

Kamiyarp bertanda tarEan diba,vah iny'We tt€ urdors/gEdl

NamalvrE DARMAWAN PRASOOJO


Alamat kantor/ol,ico sddrBss PT Pr.X (PERSERO)
Jl. TrunoFyo Blok M l/135
Jakarta Seldan
Alamal domisilis€suai KTP atau katu iMent,tfi Ttle Green Cluster Gcnd Canyon Blok l-2 No. 25 BS
lain/Odrtcdo as s6ed ,n ,O Ca.d RT. 009, RW. 0G5, Kec Serpoog,
Tameram Selatan
Nomor telegorrPlrone rurrbo, (021)72 1D
Jabatary'Posrilron DIREKTUR UTAMA / PRES/OEIJT ARECTOR

2. Nama/Nsno SINTHYA ROESLY


Alamal kantor/Oltice addrBss PT PLN (PERSERO)
Jl. Trunohyo Blok M U1 35
Jakaria Selatan
Alamat domisilisesuai KTP atau kartu indenlitas APT Taman Rasuna TWR 17-14 D
lainlDomicile as stated in lD Catd RT 003 RW010
Menteng Alas, Setiabudi
Jakarta Selatan
Nomor lelepon/Plpne nu,bgr 1021) 7261122
Jabatan/Pasrtbn DIREKTUR KEUANGAN / DIRECTOR OF FINAI/GE

menyatakan bahwa/slate lhaf

1. lGmi bedanggung ja,vab at6 penyusunan dan penyajian 1. We are rcsrylsibb fu


B prcWdioo and prcso aliu ol ip
Laporan lGuangan Kor6olidasian lnlerim; I ein Cwsolidaled Financial Sldener,ls,

2. La@mn Keuaman Konsolid$ian lnl€rim telah dbusun dan 2. The l ein Consolidded Firarxral Statenerls ha/6 b€€n
disaikan sesuai dengan PrirEip Akunlansi yang Berlaku prepad aod pE,seded k *@danca wilh ldon€Aie,l
Umun di lndonBia: Ge^edly Ac@f,d A(I:Nding Pnnapl€€;
3. a. Semua infoimasi dalam Leoran Keuangan 3. a. All inffiion Ntuind in flE l ein Co/t.s;diddsd
Konsolirfiian lnledm telah dimuat secaa lengkap dan Financid Sldwetts is cdnplde aN wrcct,
benm
b. Laporan KeuarEan Koosdirasiao lnl€dm lidak b. Ttp htdin Calf,didd€d Financial si,denents do tlol
orcrEadung inftymasi atau faha mabrial yaI€ lidal codain nisle€di,! ntffiid inffii@ or la& aN do nd
benar dar lidak meruhilangkan infomasi atau hkta onitnddidkffiin dffil
materid;

4. Kani bertangqung iayrab al6 sblem porEeodaliar intem 1. We arc re$pors,itle /tr tlB Conpaty ard is Subsiri&hs
Pen6ahaan dan Ent'bs Anak. lfitefid @tfu sydefi.

Demikian pemyataafl ini dih,at dengan sebeoamya. This stdanett ldtet is nde ln,thfu y.

Jakarta,2S Juli2023 / July 28 ,2023

L
7101032

DARIIIAWAN PRASODJO SININYA ROESLY


Direktur Utama / P/Bsdenl D,l€ctor Oiekfii Keuar(€n I D dor ol Finance

Jl.Trunojoyo Blok M-l/135 Kebayoran Baru Jakarta 12160


T (021) 7261 87 5, 7 261',t22, 7262234, 725 1 214, 7250550
F \021) 7221330,73971 50 W www.pln.co.id Paraf 4x,
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 1/1 Schedule

LAPORAN POSISI KEUANGAN CONSOLIDATED STATEMENTS OF


KONSOLIDASIAN PADA TANGGAL FINANCIAL POSITION
30 JUNI 2023 DAN 31 DESEMBER 2022 AS AT JUNE 30, 2023 AND DECEMBER 31, 2022
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

30 Juni/ 31 Desember/
Catatan/ June 30, December 31,
Notes 2023 2022
ASET ASSETS
ASET TIDAK LANCAR NON-CURRENT ASSETS
Aset tetap 6 1,433,672,059 1,433,048,983 Property, plant and equipment
Aset hak-guna 7 28,188,577 29,005,193 Right-of-use assets
Properti investasi 8 5,639,942 5,623,489 Investment properties
Investasi pada entitas asosiasi 9 8,703,794 8,085,714 Investments in associates
Investasi pada ventura bersama 9 16,911,055 16,157,754 Investments in joint ventures
Aset pajak tangguhan 47 330,419 427,448 Deferred tax assets
Piutang pihak berelasi 10 2,001,303 1,288,270 Receivables from related parties
Rekening bank
dibatasi penggunaannya 11 5,334,520 4,454,508 Restricted cash in banks
Piutang lain-lain 17 1,502,684 1,348,132 Other receivables
Pajak dibayar di muka 19 9,746,567 11,351,639 Prepaid expenses and advances
Piutang dari Pemerintah 16 2,587,938 2,587,938 Receivables from Government
Biaya dibayar di muka dan uang muka 471,013 169,367 Prepaid expenses and advances
Aset tidak lancar lain 12 6,225,519 5,199,459 Other non-current assets
Jumlah Aset Tidak Lancar 1,521,315,390 1,518,747,894 Total Non-current Assets

ASET LANCAR CURRENT ASSETS


Kas dan setara kas 13 29,894,241 51,503,096 Cash and cash equivalents
Rekening bank
dibatasi penggunaannya 11 366 302,386 Restricted cash in banks
Investasi jangka pendek 14 945,070 533,332 Short-term investments
Piutang usaha Trade receivables
Pihak berelasi 15 2,178,029 2,258,400 Related parties
Pihak ketiga 15 24,291,737 22,498,882 Third parties
Piutang dari pemerintah 16 45,940,660 18,882,562 Receivables from Government
Piutang lain-lain 17 1,860,308 1,368,707 Other receivables
Persediaan 18 16,977,530 17,534,804 Inventories
Pajak dibayar di muka 19 2,519,852 3,524,488 Prepaid taxes
Biaya dibayar di muka dan uang muka 20 451,704 646,651 Prepaid expenses and advances
Piutang pihak berelasi 10 59,578 231,006 Receivables from related parties
Aset derivatif 56 7,331 107,068 Derivative assets

Jumlah Aset Lancar 125,126,406 119,391,382 Total Current Assets

JUMLAH ASET 1,646,441,796 1,638,139,276 TOTAL ASSETS

Catatan atas laporan keuangan konsolidasian merupakan bagian The accompanying notes to the consolidated financial statements
yang tidak terpisahkan dari laporan keuangan konsolidasian form an integral part of these consolidated financial statements
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 1/2 Schedule


LAPORAN POSISI KEUANGAN CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN PADA TANGGAL FINANCIAL POSITION
30 JUNI 2023 DAN 31 DESEMBER 2022 AS AT JUNE 30, 2023 AND DECEMBER 31, 2022
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

30 Juni/ 31 Desember/
Catatan/ June 30, December 31,
Notes 2023 2022
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
EKUITAS EQUITY
Ekuitas yang dapat diatribusikan Equity attributable to owners
kepada pemilik entitas induk of the parent
Modal saham - nilai nominal Rp1 per saham Capital stock - par value of Rp1 per share
Modal dasar - 439.000.000 saham Authorized - 439,000,000 shares
Modal ditempatkan dan disetor penuh Subscribed and paid-up
145.536.096 saham 145,536,096 shares,
pada 30 Juni 2023 dan as at June 30, 2023 and
145.536.096 saham pada 145,536,096 shares, as at
31 Desember 2022. 21 145,536,096 145,536,096 December 31, 2022.
Tambahan modal disetor 22 34,608 34,608 Additional paid-in capital
Penyertaan modal Negara dalam proses Stock subscription from Government
penerbitan saham 21 5,000,000 5,000,000 in issuance process
Selisih transaksi dengan pihak Difference in value from transactions
non-pengendali (2,100) (2,100) with non-controlling interests
Saldo laba Retained earnings
Ditentukan penggunaannya 21 76,803,066 64,657,026 Appropriated
Tidak ditentukan penggunaannya 21 110,999,724 99,438,371 Unappropriated
Penghasilan komprehensif lain 675,414,937 675,695,036 Other comprehensive income
Ekuitas yang dapat diatribusikan Equity attributable to owners
kepada pemilik entitas induk 1,013,786,331 990,359,037 of the parent
Kepentingan non-pengendali 1,112,972 1,091,529 Non-controlling interests

Jumlah Ekuitas 1,014,899,303 991,450,566 Total Equity

LIABILITAS JANGKA PANJANG NON-CURRENT LIABILITIES


Liabilitas pajak tangguhan 48 51,706,178 48,427,461 Deferred tax liabilities
Pendapatan ditangguhkan 23 23,882,143 20,060,147 Deferred revenue
Utang jangka panjang -
setelah dikurangi bagian
jatuh tempo Long-term liabilities -
dalam satu tahun net of current portion
Penerusan pinjaman 24 26,463,782 30,182,450 Two-step loans
Utang kepada Pemerintah Government and
dan lembaga keuangan non-bank Government
Pemerintah non-bank 25 1,838,424 2,202,823 financial institution loans
Utang sewa 26 9,243,521 8,413,952 Lease liabilities
Utang bank 27 106,327,844 122,437,243 Bank loans
Utang obligasi dan sukuk ijarah 28 190,884,653 198,471,221 Bonds payable and sukuk ijara
Utang listrik swasta 29 5,229,470 5,711,856 Electricity purchase payable
Liabilitas imbalan kerja 50 66,164,679 65,038,580 Employee benefits liabilities
Utang lain-lain 32 756,880 671,526 Other payables

Jumlah Liabilitas Jangka Panjang 482,497,574 501,617,259 Total Non-current Liabilities

Catatan atas laporan keuangan konsolidasian merupakan bagian The accompanying notes to the consolidated financial statements
yang tidak terpisahkan dari laporan keuangan konsolidasian form an integral part of these consolidated financial statements
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 1/3 Schedule

LAPORAN POSISI KEUANGAN CONSOLIDATED STATEMENTS OF


KONSOLIDASIAN PADA TANGGAL FINANCIAL POSITION
30 JUNI 2023 DAN 31 DESEMBER 2022 AS AT JUNE 30, 2023 AND DECEMBER 31, 2022
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

30 Juni/ 31 Desember/
Catatan/ June 30, December 31,
Notes 2023 2022

LIABILITAS JANGKA PENDEK CURRENT LIABILITIES


Utang usaha Trade payables
Pihak berelasi 31 14,540,492 15,212,073 Related parties
Pihak ketiga 31 40,324,607 35,871,189 Third parties
Utang pajak 33 6,532,329 2,285,782 Taxes payable
Biaya masih harus dibayar 34 7,761,301 7,353,802 Accrued expenses
Uang jaminan langganan 35 17,066,715 16,539,411 Customers' security deposits
Utang biaya proyek 36 1,821,974 2,096,511 Project cost payable
Pendapatan ditangguhkan 23 1,375,269 1,143,357 Deferred revenue
Utang jangka panjang jatuh tempo Current maturities of
dalam satu tahun long-term liabilities
Penerusan pinjaman 24 2,814,297 3,002,264 Two-step loans
Utang kepada Pemerintah Government and non-bank
dan lembaga keuangan Government financial
Pemerintah non-bank 25 2,938,000 1,425,985 institution loans
Utang sewa 26 2,697,560 4,448,363 Lease liabilities
Utang bank 27 25,944,502 29,972,875 Bank loans
Utang obligasi dan sukuk ijarah 28 3,460,500 2,863,200 Bonds payable and sukuk ijara
Utang listrik swasta 29 523,532 528,890 Electricity purchase payable
Liabilitas imbalan kerja 50 6,545,789 9,311,116 Employee benefits liabilities
Utang lain-lain 32 14,698,052 13,016,633 Other payables
Jumlah Liabilitas Jangka Pendek 149,044,919 145,071,451 Total Current Liabilities
JUMLAH LIABILITAS 631,542,493 646,688,710 TOTAL LIABILITIES

JUMLAH EKUITAS DAN LIABILITAS 1,646,441,796 1,638,139,276 TOTAL EQUITY AND LIABILITIES

Catatan atas laporan keuangan konsolidasian merupakan bagian The accompanying notes to the consolidated financial statements
yang tidak terpisahkan dari laporan keuangan konsolidasian form an integral part of these consolidated financial statements
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 2/1 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN CONSOLIDATED STATEMENTS OF PROFIT OR LOSS


KOMPREHENSIF LAIN KONSOLIDASIAN AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE ENAM BULAN YANG BERAKHIR FOR THE SIX MONTH PERIODS ENDED
PADA TANGGAL 30 JUNI 2023 DAN 2022 JUNE 30, 2023 AND 2022
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

2023 2022 *)
Catatan/ (Enam Bulan/ (Enam Bulan/
Notes Six Months) Six Months)
PENDAPATAN USAHA REVENUES
Penjualan tenaga listrik 36 159,971,563 150,550,915 Sale of electricity
Penyambungan pelanggan 23 584,331 382,460 Customer connection fees
Subsidi listrik Pemerintah 37 32,069,605 26,189,358 Government's electricity subsidy
Pendapatan kompensasi 16 37,857,021 31,226,632 Compensation income
Lain-lain 38 4,037,185 3,310,867 Others
Jumlah Pendapatan Usaha 234,519,705 211,660,232 Total Revenues
BEBAN USAHA OPERATING EXPENSES
Bahan bakar dan pelumas 39 73,852,882 69,073,657 Fuel and lubricants
Pembelian tenaga listrik 40 73,227,621 58,593,770 Purchased electricity
Sewa 41 821,787 1,973,719 Lease
Pemeliharaan 42 12,040,227 10,404,470 Maintenance
Kepegawaian 43 15,658,611 11,660,290 Personnel
Penyusutan aset tetap 6 21,223,269 19,467,134 Property, plant and equipment depreciation
Penyusutan aset hak-guna 7 1,386,009 1,270,402 Right-of-use assets depreciation
Lain-lain 44 4,023,212 3,037,631 Others
Jumlah Beban Usaha 202,233,618 175,481,073 Total Operating Expenses

LABA USAHA 32,286,087 36,179,159 OPERATING PROFIT

Penghasilan (beban) lain-lain - bersih 46 (118,766) 326,290 Other income (expense) - net
Keuntungan (kerugian) Gain (loss) on foreign
kurs mata uang asing - bersih 11,240,422 (5,346,581) exchange - net
Penghasilan keuangan 642,297 482,687 Financial income
Beban keuangan 45 (11,031,271)
- (9,729,130) Financial cost
LABA SEBELUM PAJAK 33,018,769 21,912,425 PROFIT BEFORE TAX

BEBAN PAJAK PENGHASILAN 47 (7,101,933) (4,532,334) INCOME TAX EXPENSE

LABA PERIODE BERJALAN 25,916,836 17,380,091 PROFIT FOR THE PERIODE

*) Direklasifikasi kembali, lihat Catatan 58 *) As reclassified, see Note 58

Catatan atas laporan keuangan konsolidasian merupakan bagian The accompanying notes to the consolidated financial statements
yang tidak terpisahkan dari laporan keuangan konsolidasian form an integral part of these consolidated financial statements
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 2/2 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN CONSOLIDATED STATEMENTS OF PROFIT OR LOSS


KOMPREHENSIF LAIN KONSOLIDASIAN AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE ENAM BULAN YANG BERAKHIR FOR THE SIX MONTH PERIODS ENDED
PADA TANGGAL 30 JUNI 2023 DAN 2022 JUNE 30, 2023 AND 2022
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

2023 2022
Catatan/ (Enam Bulan/ (Enam Bulan/
Notes Six Months) Six Months)
LABA PERIODE BERJALAN 25,916,836 17,380,091 PROFIT FOR THE PERIOD
Penghasilan komprehensif lain Other comprehensive income
periode berjalan for the period
Pos-pos yang akan direklasifikasi Items that may b e reclassified
ke laba rugi: sub sequently to profit or loss:
Bagian penghasilan komprehensif lain dari Share of other comprehensive income
entitas asosiasi dan ventura bersama 9 (127,023) 1,075,060 from associates and joint venture
Pos-pos yang tidak akan direklasifikasi Items that will not b e reclassified
ke laba rugi: to profit or loss:
Perubahan surplus revaluasi Changes in property, plant and equipment
aset tetap 6 (83,977) - revaluation surplus
Pengukuran kembali Remeasurement
atas program imbalan pasti 49 (87,574) (339,005) on defined b enefit plans
Manfaat (Beban) pajak terkait 47 37,741 93,831 Related income tax b enefits
Penghasilan komprehensif lain Other comprehensive income
Periode berjalan setelah pajak (260,833) 829,886 for the period after tax
JUMLAH PENGHASILAN KOMPREHENSIF TOTAL COMPREHENSIVE INCOME
PERIODE BERJALAN 25,656,003 18,209,977 FOR THE PERIOD

Laba (rugi) periode berjalan Income (loss) for the period


diatribusikan kepada: attrib utab le to:
kepada Pemilik entitas induk 25,895,393 17,346,476 Owners of the parent
Kepentingan non-pengendali 21,443- 33,615 Non-controlling interest
Jumlah 25,916,836- 17,380,091 Total

Jumlah penghasilan komprehensif periode Total comprehensive income


berjalan diatribusikan kepada: for the period attrib utab le to:
Pemilik entitas induk 25,634,560 18,176,362 Owners of the parent
Kepentingan non-pengendali 21,443 33,615 Non-controlling interest
Jumlah 25,656,003 18,209,977 Total

LABA PER SAHAM DASAR EARNINGS PER SHARE


DASAR/DILUSIAN BASIC/DILUTED
(Dalam Rupiah penuh) 48 180,391 124,602 (in Rupiah full amount)

Catatan atas laporan keuangan konsolidasian merupakan bagian The accompanying notes to the consolidated financial statements
yang tidak terpisahkan dari laporan keuangan konsolidasian form an integral part of these consolidated financial statements
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 3/1 Schedule

LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY


UNTUK PERIODE ENAM BULAN YANG BERAKHIR FOR THE SIX MONTH PERIODS ENDED
PADA TANGGAL 30 JUNI 2023 DAN 2022 JUNE 30, 2023 AND 2022
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity


Penghasilan komprehensif lain/
Other comprehensive income
Bagian
Penyertaan penghasilan
modal Negara komprehensif
dalam proses Surplus lain dari Selisih transaksi Ekuitas
Modal penerbitan revaluasi entitas asosiasi dengan pihak yang dapat
ditempatkan saham/ aset Pengukuran dan ventura non-pengendali/ diatribusikan
dan disetor Stock Tambahan tetap/ kembali bersama/ Difference in kepada pemilik
penuh/ subscription modal Saldo laba/ Property, atas program Share of other value from entitas induk/
Subscribed from disetor/ Retained earnings plant and imbalan pasti/ comprehensive transactions Equity Kepentingan
and paid-up Government Additional Ditentukan Tidak ditentukan equipment Remeasurement income from with attributable non-pengendali/
capital in issuance paid-in penggunaannya/ penggunaannya/ revaluation on defined associates and non-controlling to owner of Non-controlling Jumlah ekuitas/
stock process capital Appropriated Unappropriated surplus benefit plans joint ventures interests the parent interests Total equity

Saldo per 1 Januari 2022 135,460,886 10,075,210 34,608 64,657,026 84,962,218 688,912,786 (4,672,747) 1,168,006 - 980,597,993 1,009,130 981,607,123 Balance as of January 1, 2022

Penambahan modal dan Addition from shares


penerbitan saham 10,075,210 (10,075,210) - - - - - - - - - - issuance
Jumlah penghasilan komprehensif - Total comprehensive income
periode berjalan - - - - 17,346,476 (68,249) (264,424) 1,075,060 - 18,088,863 33,615 18,122,478 for the period

Saldo per 30 Juni 2022 145,536,096 - 34,608 64,657,026 102,308,694 688,844,537 (4,937,171) 2,243,066 - 998,686,856 1,042,745 999,729,601 Balance as of June 30, 2022

Saldo per 1 Januari 2023 145,536,096 5,000,000 34,608 64,657,026 99,438,371 688,538,705 (16,929,028) 4,085,359 (2,100) 990,359,037 1,091,529 991,450,566 Balance as of January 1, 2023

Cadangan umum tahun berjalan 12,146,040 (12,146,040) - - Appropriation during the year
Dividen (2,188,000) (2,188,000) (2,188,000) Dividends
Jumlah penghasilan komprehensif - Total comprehensive income
periode berjalan - - - - 25,895,393 (65,502) (87,574) (127,023) - 25,615,294 21,443 25,636,737 for the period

Saldo per 30 Juni 2023 145,536,096 5,000,000 34,608 76,803,066 110,999,724 688,473,203 (17,016,602) 3,958,336 (2,100) 1,013,786,331 1,112,972 1,014,899,303 Balance as of June 30, 2023

Catatan atas laporan keuangan konsolidasian merupakan bagian The accompanying notes to the consolidated financial statements
yang tidak terpisahkan dari laporan keuangan konsolidasian form an integral part of these consolidated financial statements
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 4/1 Schedule

LAPORAN ARUS KAS KONSOLIDASIAN CONSOLIDATED STATEMENTS OF


UNTUK PERIODE ENAM BULAN YANG BERAKHIR CASH FLOWS FOR THE SIX MONTHS ENDED
PADA TANGGAL 30 JUNI 2023 DAN 2022 JUNE 30, 2023 AND 2022
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

2023 2022
(Enam Bulan/ (Enam Bulan/
Six Months) Six Months)
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS OPERASI OPERATING ACTIVITIES
Penerimaan kas dari pelanggan 168,651,568 157,567,342 Cash receipts from customers
Pembayaran kas kepada pemasok (163,754,473) (143,908,579) Cash paid to suppliers
Pembayaran kas kepada karyawan (16,876,479) (9,192,828) Cash paid to employees
Penerimaan subsidi listrik 26,097,738 21,270,989 Government subsidy received
Penerimaan kompensasi 16,094,804 - Compensation received
Pembayaran utang kepada pemerintah - (1,202,263) Payments of Government Loans
Penerimaan bunga 642,297 482,687 Interest received
Pembayaran bunga (10,579,580) (9,883,498) Interest expense paid
Penerimaan restitusi pajak lainnya 1,733,883 254,473 Cash receipts for other taxes
Pembayaran pajak penghasilan (590,456) (790,336) Income tax paid
Kas bersih diperoleh dari Net cash provided by
aktivitas operasi 21,419,301 14,597,987 operating activities

ARUS KAS DARI CASH FLOWS FROM


AKTIVITAS INVESTASI INVESTING ACTIVITIES
Hasil penjualan aset Proceeds from sale of assets
tidak digunakan dalam operasi 7,087 9,883 not used in operations
Perolehan aset tetap (21,774,724) (17,015,910) Addition of property, plant and equipment
Perolehan dividen dari Dividends received from
entitas asosiasi dan ventura bersama 151,739 248,098 associates and joint ventures
Perolehan investasi pada Acquisition of investments in
entitas asosiasi dan ventura bersama - (364,751) associates and joint ventures
Penarikan rekening bank dan Withdrawal of restricted
deposito berjangka dibatasi penggunaannya - 365,614 cash in banks and time deposits
Penempatan rekening bank dan Placement of restricted
deposito berjangka dibatasi penggunaannya (577,992) (1,762,680) cash in banks and time deposits
Penarikan investasi jangka pendek - 366,435 Withdrawal of short-term investments
Penempatan investasi jangka pendek (411,738) (491,493) Placement of short-term investments
Kas bersih digunakan Net cash used in
untuk aktivitas investasi (22,605,628) (18,644,804) investing activities

Catatan atas laporan keuangan konsolidasian merupakan bagian The accompanying notes to the consolidated financial statements
yang tidak terpisahkan dari laporan keuangan konsolidasian form an integral part of these consolidated financial statements
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 4/2 Schedule

LAPORAN ARUS KAS KONSOLIDASIAN CONSOLIDATED STATEMENTS OF


UNTUK PERIODE ENAM BULAN YANG BERAKHIR CASH FLOWS FOR THE SIX MONTHS ENDED
PADA TANGGAL 30 JUNI 2023 DAN 2022 JUNE 30, 2023 AND 2022
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

(Enam Bulan/ (Enam Bulan/


Six Months) Six Months)
2023 2022
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS PENDANAAN FINANCING ACTIVITIES
Penerimaan penerusan pinjaman 89,313 357,757 Proceeds of two-step loans
Pembayaran penerusan pinjaman (1,446,201) (1,598,566) Payments of two-step loans
Pembayaran utang kepada Pemerintah dan Payments of Government and non-bank
lembaga keuangan Pemerintah non-bank (375,000) (375,000) Government financial institution loans
Penerimaan utang bank - jangka pendek - 14,400,000 Proceeds of bank loans - short-term
Penerimaan utang bank - jangka panjang 914,003 12,615,300 Proceeds of bank loans- long-term
Pembayaran utang bank - jangka pendek - (7,500,000) Payment of bank loans- short-term
Pembayaran utang bank - jangka panjang (16,952,136) (20,896,903) Payment of bank loans- long-term
Pembayaran utang obligasi dan sukuk ijarah (877,700) (632,000) Payment of bonds payable and sukuk ijara
Pembayaran utang KIK-EBA - (470,950) Payment of KIK-EBA loans
Pembayaran utang sewa (1,351,919) (1,250,356) Payments of lease liabilities
Pembayaran utang listrik swasta (251,830) (234,740) Payments of electricity purchase payable
Kas bersih digunakan untuk Net cash used in
aktivitas pendanaan (20,251,471) (5,585,458) financing activities
KENAIKAN (PENURUNAN) BERSIH KAS NET INCREASE (DECREASE) IN CASH
DAN SETARA KAS (21,437,798) (9,632,275) AND CASH EQUIVALENTS
Pengaruh perubahan kurs mata uang asing (171,048) 118,223 Effect of changes in foreign currency
Cadangan kerugian kredit ekspektasian atas Allowance for expected credit loss of
kas dan setara kas (9) (9) cash and cash equivalents
CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AWAL PERIODE 51,503,096 37,968,399 AT BEGINNING OF THE PERIOD

CASH AND CASH EQUIVALENTS


KAS DAN SETARA KAS AKHIR PERIODE 29,894,241 28,454,337 AT END OF THE PERIOD

Catatan atas laporan keuangan konsolidasian merupakan bagian The accompanying notes to the consolidated financial statements
yang tidak terpisahkan dari laporan keuangan konsolidasian form an integral part of these consolidated financial statements
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/1 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

1. INFORMASI UMUM 1. GENERAL INFORMATION

a. Pendirian dan informasi lainnya a. Establishment and other information

Perusahaan Perseroan (Persero) PT Perusahaan Perseroan (Persero) PT


Perusahaan Listrik Negara (“PLN” atau Perusahaan Listrik Negara (“PLN” or the
“Perusahaan”) didirikan pada tahun 1961 dalam “Company”) was established in 1961 as a unit of
bentuk Jawatan di dalam lingkungan the Indonesian Ministry of Energy and Public
Kementerian Pekerjaan Umum dan Tenaga. Works. The Company is a business continuation
Perusahaan merupakan kelanjutan usaha of several Dutch electricity companies which
beberapa perusahaan listrik Belanda yang have been taken over by the Government of the
diambil alih oleh Pemerintah Republik Indonesia Republic of Indonesia including, among others,
tersebut meliputi: NV ANIEM, NV SEM, NV the following: NV ANIEM, NV SEM, NV OJEM,
OJEM, NV EMS, NV EMBALOM, NV GEBEO, NV EMS, NV EMBALOM, NV GEBEO, NV
NV OGEM dan NV WEMI. Berdasarkan OGEM and NV WEMI. Based on Government
Peraturan Pemerintah No. 19 tahun 1965, Regulation No. 19 year 1965, the status of the
status Perusahaan berubah menjadi Company was changed to that of a legal entity.
perusahaan yang berbadan hukum. Selanjutnya Subsequently, based on Government
ditetapkan menjadi Perusahaan Umum (Perum) Regulation No. 30 year 1970, as amended by
berdasarkan Peraturan Pemerintah No. 30 Government Regulation No. 18 year 1972, the
tahun 1970 yang dipertegas dengan Peraturan Company became a Perusahaan Umum
Pemerintah No. 18 tahun 1972. Kemudian (Perum). Based on Notarial Deed No. 169 of
berdasarkan Akta No. 169 tanggal 30 Juli 1994 Sutjipto, S.H., Notary in Jakarta, dated July 30,
dari Sutjipto, S.H., Notaris di Jakarta, status 1994, the Company’s status was changed to a
badan hukum Perusahaan berubah menjadi Limited Liability Company and it was named
Perseroan Terbatas dengan nama Perusahaan Perusahaan Perseroan PT Perusahaan Listrik
Perseroan PT Perusahaan Listrik Negara Negara or PT PLN (Persero). This change was
disingkat PT PLN (Persero). Akta perubahan ini approved by the Minister of Justice in his
disahkan dengan Keputusan Menteri decision letter No. C2-11.519.HT.01.01.Th.94
Kehakiman No. C2-11.519.HT.01.01.Th.94 dated August 1, 1994 and was published in
tanggal 1 Agustus 1994, serta diumumkan State Gazette of the Republic of Indonesia No.
dalam Berita Negara Republik Indonesia No. 73 73 dated September 13, 1994, Supplement No.
tanggal 13 September 1994, Tambahan 6731.
No. 6731.

Anggaran Dasar Perusahaan telah diubah The Articles of Association of the Company
beberapa kali dengan perubahan terakhir have been amended several times, with the
berdasarkan Akta Notaris No. 11, tanggal 22 most recent change by Notarial Deed No. 11,
Agustus 2022 dari Lenny Janis Ishak, S.H., dated August 22, 2022 of Lenny Janis Ishak,
Notaris di Jakarta mengenai perubahan maksud S.H., Notary in Jakarta regarding the purposes
dan tujuan serta kegiatan usaha. Perubahan ini and objectives as well as the business activities
telah disetujui oleh Menteri Hukum dan HAM of the Company. This amendment has been
Republik Indonesia berdasarkan Surat approved by the Minister of Law and Human
Keputusan Menteri No. AHU-0060721.AH.01.02 Rights based on Ministerial Decree No. AHU-
tanggal 25 Agustus 2022. 0060721.AH.01.02, dated August 25, 2022.

Perusahaan berdomisili di Jakarta dan memiliki The Company is domiciled in Jakarta, with 46
46 unit pelaksana yang tersebar di wilayah business unit offices across Indonesia, 4
Indonesia, 4 subholding dan 7 entitas anak. subholdings and 7 subsidiaries. The Company’s
Kantor Pusat Perusahaan beralamat di Jl. Head Office is located at Jl. Trunojoyo Blok M I
Trunojoyo Blok M I No. 135, Jakarta. No. 135, Jakarta.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/2 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)

a. Pendirian dan informasi lainnya (lanjutan) a. Establishment and other information


(continued)

Sesuai dengan Pasal 3 Anggaran Dasar In accordance with Article 3 of the Company’s
Perusahaan, Maksud dan Tujuan Perusahaan Articles of Association, the Purpose and Objective
adalah untuk menyelenggarakan usaha of the Company is to engage in electricity
penyediaan tenaga listrik bagi kepentingan business for public use of sufficient quantity and
umum dalam jumlah dan mutu yang memadai quality and also to earn profit and perform the
serta memupuk keuntungan dan melaksanakan Government’s assignment in electricity business
penugasan Pemerintah di bidang in order to support the development of the country
ketenagalistrikan dalam rangka mendukung with the application of the principles of a Limited
pembangunan negara dengan menerapkan Liability Company.
prinsip-prinsip Perseroan Terbatas.

Sesuai dengan Undang-Undang No. 19 tahun Based on Law No. 19 year 2003, regarding State-
2003 tentang Badan Usaha Milik Negara Owned Enterprises (“SOEs”), the Government is
(“BUMN”), Pemerintah wajib memberikan obliged to provide compensation to SOEs, that
kompensasi atas semua biaya yang telah were appointed to perform special assignments,
dikeluarkan oleh BUMN termasuk margin for all expenses which they have incurred,
tertentu yang diharapkan kepada BUMN yang including a certain expected return (margin). The
diberikan penugasan khusus. Perusahaan Company is an SOE, that performs the special
merupakan BUMN yang sedang melaksanakan assignment of providing subsidised electricity to
penugasan khusus berupa penyediaan tenaga the public (Note 37).
listrik bersubsidi kepada masyarakat (Catatan
37).

Pada tanggal 30 Juni 2023, Grup memiliki As at June 30, 2023 the Group had 51,263
51.263 karyawan tetap (2022: 51.245 karyawan permanent employees (2022: 51,245 permanent
tetap) (tidak diaudit). Jumlah karyawan tidak employees) (unaudited). The total number of
termasuk karyawan dari PT Haleyora employees does not include employees of PT
Powerindo yang bergerak dibidang jasa tenaga Haleyora Powerindo whose nature of business is
kerja. PT Haleyora Powerindo adalah entitas manpower services. PT Haleyora Powerindo is a
anak dari PT Haleyora Power, entitas anak subsidiary of PT Haleyora Power, the Company’s
Perusahaan. subsidiary.

b. Penawaran umum efek utang Perusahaan b. The Company’s public offering of bonds

Perusahaan telah beberapa kali menerbitkan The Company has issued several PLN Bonds and
Obligasi dan Surat Utang PLN, sebagai berikut: Notes, as follows:
Jumlah yang
Tanggal ditawarkan/
Tanggal efektif/ Bursa pencatatan/ pencatatan/ Offered amount
Effective date Listed on *) Listed date Rp

Obligasi Rupiah Rupiah Bonds

Obligasi Berkelanjutan IV PLN Shelf Registration Bonds IV PLN


Tahap I Tahun 2020 31 Agustus 2020/ Bursa Efek Indonesia/ 8 September 2020/ 1,500,000 Phase I Year 2020
August 31, 2020 Indonesia Stock Exchange September 8, 2020
Sukuk Ijarah Berkelanjutan IV PLN Shelf Registration Sukuk Ijara IV PLN
Tahap I Tahun 2020 31 Agustus 2020/ Bursa Efek Indonesia/ 8 September 2020/ 376,500 Phase I Year 2020
August 31, 2020 Indonesia Stock Exchange September 8, 2020
Obligasi Berkelanjutan III PLN Shelf Registration Bonds III PLN
Tahap VII Tahun 2020 29 Juni 2018/ Bursa Efek Indonesia/ 6 Mei 2020/ 1,737,135 Phase VII Year 2020
June 29, 2018 Indonesia Stock Exchange May 6, 2020
Obligasi Berkelanjutan III PLN Shelf Registration Bonds III PLN
Tahap VI Tahun 2020 29 Juni 2018/ Bursa Efek Indonesia/ 18 Februari 2020/ 4,812,430 Phase VI Year 2020
June 29, 2018 Indonesia Stock Exchange February 18, 2020
Sukuk Ijarah Berkelanjutan III PLN Shelf Registration Sukuk Ijara III PLN
Tahap VI Tahun 2020 29 Juni 2018/ Bursa Efek Indonesia/ 18 Februari 2020/ 115,500 Phase VI Year 2020
June 29, 2018 Indonesia Stock Exchange February 18, 2020
Obligasi Berkelanjutan III PLN Shelf Registration Bonds III PLN
Tahap V Tahun 2019 29 Juni 2018/ Bursa Efek Indonesia/ 1 Oktober, 2019 1,912,900 Phase V Year 2019
June 29, 2018 Indonesia Stock Exchange October 1, 2019
Sukuk Ijarah Berkelanjutan III PLN Shelf Registration Sukuk Ijara III PLN
Tahap V Tahun 2019 29 Juni 2018/ Bursa Efek Indonesia/ 1 Oktober, 2019 797,500 Phase V Year 2019
June 29, 2018 Indonesia Stock Exchange October 1, 2019
Obligasi Berkelanjutan III PLN Shelf Registration Bonds III PLN
Tahap IV Tahun 2019 29 Juni 2018/ Bursa Efek Indonesia/ 1 Agustus 2019/ 2,953,620 Phase IV Year 2019
June 29, 2018 Indonesia Stock Exchange August 1, 2019
Sukuk Ijarah Berkelanjutan III PLN Shelf Registration Sukuk Ijara III PLN
Tahap IV Tahun 2019 29 Juni 2018/ Bursa Efek Indonesia/ 1 Agustus 2019/ 1,250,000 Phase IV Year 2019
June 29, 2018 Indonesia Stock Exchange August 1, 2019
Obligasi Berkelanjutan III PLN Shelf Registration Bonds III PLN
Tahap III Tahun 2019 29 Juni 2018/ Bursa Efek Indonesia/ 19 Februari 2019/ 2,393,000 Phase III Year 2019
June 29, 2018 Indonesia Stock Exchange February 19, 2019

*) Pada tanggal 22 Juli 1995 Bursa Paralel Indonesia *) On July 22, 1995 the Indonesia Parallel Exchange was
diakuisisi oleh Bursa Efek Surabaya. Pada tanggal acquired by the Surabaya Stock Exchange. On November
30 November 2007, Bursa Efek Surabaya dan Bursa Efek 30, 2007, the Surabaya Stock Exchange and Jakarta Stock
Jakarta digabungkan dan berubah nama menjadi Bursa Exchange merged and changed their name to the Indonesia
Efek Indonesia. Stock Exchange.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/3 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)

b. Penawaran umum efek utang Perusahaan b. The Company’s public offering of bonds
(lanjutan) (continued)

Perusahaan telah beberapa kali menerbitkan The Company has issued several PLN Bonds and
Obligasi dan Surat Utang PLN, sebagai berikut: Notes, as follows: (continued)
(lanjutan)
Jumlah yang
Tanggal ditawarkan/
Tanggal efektif/ Bursa pencatatan/ pencatatan/ Offered amount
Effective date Listed on *) Listed date Rp

Sukuk Ijarah Berkelanjutan III PLN Shelf Registration Sukuk Ijara III PLN
Tahap III Tahun 2019 29 Juni 2018/ Bursa Efek Indonesia/ 19 Februari 2019/ 863,000 Phase III Year 2019
June 29, 2018 Indonesia Stock Exchange February 19, 2019
Obligasi Berkelanjutan III PLN Shelf Registration Bonds III PLN
Tahap II Tahun 2018 29 Juni 2018/ Bursa Efek Indonesia/ 10 Oktober 2018/ 832,000 Phase II Year 2018
June 29, 2018 Indonesia Stock Exchange October 10, 2018
Sukuk Ijarah Berkelanjutan III PLN Shelf Registration Sukuk Ijara III PLN
Tahap II Tahun 2018 29 Juni 2018/ Bursa Efek Indonesia/ 10 Oktober 2018/ 224,000 Phase II Year 2018
June 29, 2018 Indonesia Stock Exchange October 10, 2018
Obligasi Berkelanjutan III PLN Shelf Registration Bonds III PLN
Tahap I Tahun 2018 29 Juni 2018/ Bursa Efek Indonesia/ 10 Juli 2018/ 1,278,500 Phase I Year 2018
June 29, 2018 Indonesia Stock Exchange July 10, 2018
Sukuk Ijarah Berkelanjutan III PLN Shelf Registration Sukuk Ijara III PLN
Tahap I Tahun 2018 29 Juni 2018/ Bursa Efek Indonesia/ 10 Juli 2018/ 750,000 Phase I Year 2018
June 29, 2018 Indonesia Stock Exchange July 10, 2018
Obligasi Berkelanjutan II PLN Shelf Registration Bonds II PLN
Tahap III Tahun 2018 21 Juni 2017/ Bursa Efek Indonesia/ 23 Februari 2018/ 2,535,000 Phase III Year 2018
June 21, 2017 Indonesia Stock Exchange February 23, 2018
Sukuk Ijara Berkelanjutan II PLN Shelf Registration Sukuk Ijara II PLN
Tahap III Tahun 2018 21 Juni 2017/ Bursa Efek Indonesia/ 23 Februari 2018/ 698,500 Phase III Year 2018
June 21, 2017 Indonesia Stock Exchange February 23, 2018
Obligasi Berkelanjutan II PLN Shelf Registration Bonds II PLN
Tahap II Tahun 2017 21 Juni 2017/ Bursa Efek Indonesia/ 2 November 2017/ 2,545,500 Phase II Year 2017
June 21, 2017 Indonesia Stock Exchange November 2, 2017
Sukuk Ijarah Berkelanjutan II PLN Shelf Registration Sukuk Ijara II PLN
Tahap II Tahun 2017 21 Juni 2017/ Bursa Efek Indonesia/ 2 November 2017/ 694,500 Phase II Year 2017
June 21, 2017 Indonesia Stock Exchange November 2, 2017
Obligasi Berkelanjutan II PLN Shelf Registration Bonds II PLN
Tahap I Tahun 2017 21 Juni 2017/ Bursa Efek Indonesia/ 12 Juli 2017/ 1,600,000 Phase I Year 2017
June 21, 2017 Indonesia Stock Exchange July 12, 2017
Sukuk Ijarah Berkelanjutan II PLN Shelf Registration Sukuk Ijara II PLN
Tahap I Tahun 2017 21 Juni 2017/ Bursa Efek Indonesia/ 12 Juli 2017/ 400,000 Phase I Year 2017
June 21, 2017 Indonesia Stock Exchange July 12, 2017
Obligasi Berkelanjutan I PLN Shelf Registration Bonds I PLN
Tahap II Tahun 2013 27 Juni 2013/ Bursa Efek Indonesia/ 11 Desember 2013/ 1,244,000 Phase II Year 2013
June 27, 2013 Indonesia Stock Exchange December 11, 2013
Sukuk Ijarah Berkelanjutan I PLN Shelf Registration Sukuk Ijara I PLN
Tahap II Tahun 2013 27 Juni 2013/ Bursa Efek Indonesia/ 11 Desember 2013/ 429,000 Phase II Year 2013
June 27, 2013 Indonesia Stock Exchange December 11, 2013
Obligasi Berkelanjutan I PLN Shelf Registration Bonds I PLN
Tahap I Tahun 2013 27 Juni 2013/ Bursa Efek Indonesia/ 8 Juli 2013/ 879,000 Phase I Year 2013
June 27, 2013 Indonesia Stock Exchange July 8, 2013
Sukuk Ijarah Berkelanjutan I PLN Shelf Registration Sukuk Ijara I PLN
Tahap I Tahun 2013 27 Juni 2013/ Bursa Efek Indonesia/ 8 Juli 2013/ 121,000 Phase I Year 2013
June 27, 2013 Indonesia Stock Exchange July 8, 2013
Obligasi PLN XII Tahun 2010 30 Juni 2010/ Bursa Efek Indonesia/ 9 Juli 2010/ 2,500,000 PLN XII Bonds Year 2010
June 30, 2010 Indonesia Stock Exchange July 9, 2010
Sukuk Ijarah PLN V Tahun 2010 30 Juni 2010/ Bursa Efek Indonesia/ 9 Juli 2010/ 500,000 Sukuk Ijara V PLN Year 2010
June 30, 2010 Indonesia Stock Exchange July 9, 2010
Obligasi PLN XI Tahun 2010 31 Desember 2009/ Bursa Efek Indonesia/ 13 Januari 2010/ 2,703,000 PLN XI Bonds Year 2010
December 31, 2009 Indonesia Stock Exchange January 13, 2010
Sukuk Ijarah PLN IV Tahun 2010 31 Desember 2009/ Bursa Efek Indonesia/ 13 Januari 2010/ 297,000 Sukuk Ijara IV PLN Year 2010
December 31, 2009 Indonesia Stock Exchange January 13, 2010
Obligasi PLN X Tahun 2009 31 Desember 2008/ Bursa Efek Indonesia/ 12 Januari 2009/ 1,440,000 PLN X Bonds Year 2009
December 31, 2008 Indonesia Stock Exchange January 12, 2009
Sukuk Ijarah PLN III Tahun 2009 31 Desember 2008/ Bursa Efek Indonesia/ 12 Januari 2009/ 760,000 Sukuk Ijara III PLN Year 2009
December 31, 2008 Indonesia Stock Exchange January 12, 2009
Obligasi PLN IX Tahun 2007 29 Juni 2007/ Bursa Efek Surabaya/ 11 Juli 2007/ 2,700,000 PLN IX Bonds Year 2007
June 29, 2007 Surabaya Stock Exchange July 11, 2007
Sukuk Ijarah PLN II Tahun 2007 29 Juni 2007/ Bursa Efek Surabaya/ 11 Juli 2007/ 300,000 Sukuk Ijara II PLN Year 2007
June 29, 2007 Surabaya Stock Exchange July 11, 2007
Obligasi PLN VIII Tahun 2006 12 Juni 2006/ Bursa Efek Surabaya/ 22 Juni 2016/ 2,200,100 PLN VIII Bonds Year 2006
June 12, 2006 Surabaya Stock Exchange June 22, 2016
Sukuk Ijarah PLN I Tahun 2006 12 Juni 2006/ Bursa Efek Surabaya/ 22 Juni 2016/ 200,000 Sukuk Ijara I PLN Year 2006
June 12, 2006 Surabaya Stock Exchange June 22, 2016
Obligasi PLN VII Tahun 2004 3 November 2004/ Bursa Efek Surabaya/ 12 November 2004/ 1,500,000 PLN VII Bonds Year 2004
November 3, 2004 Surabaya Stock Exchange November 12, 2004
Obligasi PLN VI Tahun 1997 27 Juni 1997/ Bursa Efek Surabaya/ 12 Agustus 1997/ 600,000 PLN VI Bonds Year 1997
June 27, 1997 Surabaya Stock Exchange August 12, 1997
Obligasi PLN V Tahun 1996 28 Juni 1996/ Bursa Efek Surabaya/ 28 Agustus 1996/ 1,000,000 PLN V Bonds Year 1996
June 28, 1996 Surabaya Stock Exchange August 28, 1996
Obligasi PLN IV Tahun 1995 30 Juni 1995/ Bursa Paralel Indonesia/ 4 September 1995/ 680,000 PLN IV Bonds Year 1995
June 30, 1995 Indonesia Parallel exchange September 4, 1995
Obligasi PLN III Tahun 1995 30 Januari 1995/ Bursa Paralel Indonesia/ 18 April 1995/ 318,430 PLN III Bonds Year 1995
January 30, 1995 Indonesia Parallel exchange April 18, 1995
Obligasi PLN II Tahun 1993 28 September 1993/ Bursa Paralel Indonesia/ 8 November 1993/ 600,000 PLN II Bonds Year 1993
September 28, 1993 Indonesia Parallel exchange November 8, 1993
Obligasi PLN I Tahun 1992 25 September 1992/ Bursa Paralel Indonesia/ 10 November 1992/ 300,000 PLN I Bonds Year 1992
September 25, 1992 Indonesia Parallel exchange November 10, 1992

Jumlah 51,541,115 Total

*) Pada tanggal 22 Juli 1995 Bursa Paralel Indonesia *) On July 22, 1995 the Indonesia Parallel Exchange was
diakuisisi oleh Bursa Efek Surabaya. Pada tanggal acquired by the Surabaya Stock Exchange. On November
30 November 2007, Bursa Efek Surabaya dan Bursa Efek 30, 2007, the Surabaya Stock Exchange and Jakarta Stock
Jakarta digabungkan dan berubah nama menjadi Bursa Exchange merged and changed their name to the Indonesia
Efek Indonesia. Stock Exchange.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/4 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)

b. Penawaran umum efek utang Perusahaan b. The Company’s public offering of bonds
(lanjutan) (continued)

Perusahaan telah beberapa kali menerbitkan The Company has issued several PLN Medium-
Surat Utang Jangka Menengah PLN, sebagai term Notes, as follows:
berikut:
Jumlah yang
Tanggal ditawarkan/
Tanggal efektif/ Bursa pencatatan/ pencatatan/ Offered amount
Effective date Listed on Listed date *)

Surat Utang Jangka Menengah Global Medium Term


Global - USD Notes - USD
Penerbitan tahun 2020 30 Juni 2020/ Bursa Efek Singapura/ 1 Juli 2020/ 1,500,000,000 Issued in 2020
June 30, 2020 Singapore Stock Exchange July 1, 2020
Penerbitan tahun 2019 5 November 2019/ Bursa Efek Singapura/ 7 November 2019/ 1,000,000,000 Issued in 2019
November 5, 2019 Singapore Stock Exchange November 7, 2019
17 Juli 2019/ Bursa Efek Singapura/ 18 Juli 2019/ 1,400,000,000
July 17, 2019 Singapore Stock Exchange July 18, 2019
Penerbitan tahun 2018 25 Oktober 2018/ Bursa Efek Singapura/ 26 Oktober 2018/ 1,000,000,000 Issued in 2018
October 25, 2018 Singapore Stock Exchange October 26, 2018
21 Mei 2018/ Bursa Efek Singapura/ 16 Mei 2018/ 2,000,000,000
May 21, 2018 Singapore Stock Exchange May 16, 2018
Penerbitan tahun 2017 15 Mei 2017/ Bursa Efek Singapura/ 16 Mei 2017/ 2,000,000,000 Issued in 2017
May 15, 2017 Singapore Stock Exchange May 16, 2017
Penerbitan tahun 2012 24 Oktober 2012/ Bursa Efek Singapura/ 25 Oktober 2012/ 1,000,000,000 Issued in 2012
October 24, 2012 Singapore Stock Exchange October 25, 2012
Penerbitan tahun 2011 22 November 2011/ Bursa Efek Singapura/ 23 November 2011/ 1,000,000,000 Issued in 2011
November 22, 2011 Singapore Stock Exchange November 23, 2011
Jumlah 10,900,000,000 Total

Surat Utang Jangka Menengah Global Medium Term


Global - EUR Notes - EUR
Penerbitan tahun 2019 5 November 2019/ Bursa Efek Singapura/ 7 November 2019/ 500,000,000 Issued in 2019
November 5, 2019 Singapore Stock Exchange November 7, 2019
Penerbitan tahun 2018 25 Oktober 2018/ Bursa Efek Singapura/ 26 Oktober 2018/ 500,000,000 Issued in 2018
October 25, 2018 Singapore Stock Exchange October 26, 2018
Jumlah 1,000,000,000 Total

Surat Utang Jangka Menengah Global Medium Term


Global - JPY Notes - JPY
Penerbitan tahun 2019 20 September 2019/ Tidak tercatat/ N/A 23,200,000,000 Issued in 2019
September 20, 2019 Not listed
Jumlah 23,200,000,000 Total

*) Dalam jumlah penuh *) In full amount

Majapahit Holding B.V., Belanda, entitas anak Majapahit Holding B.V., Netherlands, a wholly-
yang bertujuan khusus yang sepenuhnya milik owned special-purpose subsidiary of the
Perusahaan, menerbitkan Obligasi Terjamin, Company, issued Guaranteed Notes, as follows:
sebagai berikut:
Jumlah yang
Tanggal ditawarkan/
Tanggal efektif/ Bursa pencatatan/ pencatatan/ Offered amount
Effective date Listed on Listed date USD *)

Obligasi Terjamin - USD Guaranteed Notes - USD


Penerbitan 2009 6 November 2009/ Bursa Efek Singapura/ 9 November 2009/ 1,250,000,000 Issued in 2009
November 6, 2009 Singapore Stock Exchange November 9, 2009
Penerbitan 2009 7 Agustus 2009/ Bursa Efek Singapura/ 11 Agustus 2009/ 750,000,000 Issued in 2009
August 7, 2009 Singapore Stock Exchange August 11, 2009
Penerbitan 2007 28 Juni 2007/ Bursa Efek Singapura/ 29 Juni 2007/ 1,000,000,000 Issued in 2007
June 28, 2007 Singapore Stock Exchange June 29, 2007
Penerbitan 2006 16 Oktober 2006/ Bursa Efek Singapura/ 17 Oktober 2006/ 1,000,000,000 Issued in 2006
October 16, 2006 Singapore Stock Exchange October 17, 2006
Jumlah 4,000,000,000 Total

*) Dalam jumlah penuh *) In full amount


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/5 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)

c. Susunan pengurus dan informasi lain c. Management and other information

Pada tanggal 30 Juni 2023 dan 31 Desember As at June 30, 2023 and December 31, 2022, the
2022, susunan pengurus Perusahaan adalah Company’s management consisted of the
sebagai berikut: following:

30 Juni/ 31 Desember/
June 30, 2023, December 31, 2022

Dewan Komisaris Board of Commissioners


Komisaris Utama Amien Sunaryadi Amien Sunaryadi President Commissioner
Wakil Komisaris Utama Suahasil Nazara Suahasil Nazara Vice President Commissioner
Komisaris Dadan Kusdiana Dadan Kusdiana Commissioners
Susiwijono Moegiarso Susiwijono Moegiarso
Mohamad Ikhsan Mohamad Ikhsan
Dudy Purwagandhi Dudy Purwagandhi
Tedi Bharata Tedi Bharata
Eko Sulistyo Eko Sulistyo

Komisaris Independen Amien Sunaryadi Amien Sunaryadi Independent Commissioners


Charles Sitorus Charles Sitorus
Alex Iskandar Munaf Alex Iskandar Munaf

Direksi Board of Directors


Direktur Utama Darmawan Prasodjo Darmawan Prasodjo President Director
Direktur Keuangan Sinthya Roesly Sinthya Roesly Director of Finance
Direktur Perencanaan Korporat Director of Corporate Planning
dan Pengembangan Bisnis Hartanto Wibowo Hartanto Wibowo and Business Development
Direktur Legal dan Manajemen Human Capital Yusuf Didi Setiarto Yusuf Didi Setiarto Director of Legal and Human Capital Management
Direktur Retail dan Niaga Edi Srimulyanti Edi Srimulyanti Director of Retail and Commerce
Direktur Transmisi dan Perencanaan Sistem Evy Haryadi Evy Haryadi Director of Transmission and System Planning
Direktur Manajemen Pembangkitan Adi Lumakso Adi Lumakso Director of Generation Management
Direktur Distribusi Adi Priyanto Adi Priyanto Director of Distribution
Direktur Manajemen Proyek dan Energi Baru Director of Management Projects and
Terbarukan Wiluyo Kusdwiharto Wiluyo Kusdwiharto New Renewable Energy

Komite Audit Audit Committee


Ketua Amien Sunaryadi Amien Sunaryadi Chairman
Anggota Alex Iskandar Munaf Alex Iskandar Munaf Members
Charles Sitorus Charles Sitorus
Tomi Parisianto Wibowo Tomi Parisianto Wibowo
Nizam Burhanuddin Nizam Burhanuddin

Sekretaris Perusahaan Corporate Secretary


Sekretaris Perusahaan Alois Wisnuhardana Alois Wisnuhardana Corporate Secretary
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/6 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)

d. Pembentukan struktur subholding d. Establishment of subholding structure

Berdasarkan Surat Keputusan Menteri BUMN Based on Decision Letter of the Minister of SOE
Republik Indonesia Nomor S-886/MBU/12/2022 of the Republic of Indonesia No. S-
tanggal 30 Desember 2022 perihal Persetujuan 886/MBU/12/2022 dated December 30, 2022,
Pembentukan Holding dan Subholding PT PLN regarding the Approval for the Establishment of
(Persero) Masa/tahap Legal End-State Serta Holding and Subholding of PT PLN (Persero) for
Restrukturisasi dan Pengalihan Harta, the Legal End-State Period/Stage as well as the
Perseroan membentuk Subholding Grup yang Restructuring and Transfer of Assets, the
berlaku efektif tanggal 1 Januari 2023 melalui: Company established Group Subholdings which
became effective on January 1, 2023, through:

1. Pemekaran usaha atau pemisahan tidak 1. Partial spin-off of part of the Company’s
murni/spin-off atas sebagian aktiva dan assets and liabilities relating to the generation
pasiva kegiatan usaha pembangkitan dan and primary energy business activities to PT
energi primer Perusahaan kepada PT PLN PLN Nusantara Power (“PNP”; previously
Nusantara Power (“PNP”; dahulu bernama named PT Pembangkitan Jawa-Bali) and PT
PT Pembangkitan Jawa-Bali) dan PT Indonesia Power (“IP”).
Indonesia Power (“IP”).
2. Penyertaan modal non-tunai (inbreng) 2. In-kind capital participation (inbreng) to PT
kepada PT PLN Energi Primer Indonesia PLN Energi Primer Indonesia (“EPI”;
(“EPI”; dahulu bernama PT PLN Batubara) previously named PT PLN Batubara) in the
berupa seluruh kepemilikan saham Grup form of the Group’s entire share ownership in
pada PT Pengembang Listrik Nasional Gas PT Pengembang Listrik Nasional Gas dan
dan Geothermal (“PLN GG”) dan PT Geothermal (“PLN GG”) and PT Pelayaran
Pelayaran Bahtera Adhiguna (“BAG”). Bahtera Adhiguna (“BAG”).

Pembentukan empat Subholding Grup yang The formation of four Subholdings of the Group,
terdiri atas: consisting of:

1. Dua Subholding di bidang pembangkitan 1. Two Subholdings in the power generation


tenaga listrik, yaitu PNP dan IP; sector, namely PNP and IP;
2. Satu Subholding di bidang penyediaan dan 2. One Subholding in the primary energy
logistik energi primer, yaitu EPI; dan procurement and logistics sector, namely
EPI;
3. Satu Subholding untuk kegiatan usaha di 3. One Subholding for business activities
luar pembangkitan, transmisi, dan distribusi outside of power generation, transmission,
ketenagalistrikan, yaitu bernama PT and distribution, namely PT Indonesia
Indonesia Comnets Plus. Comnets Plus.

Pada tanggal 30 Desember 2022, sebagai On December 30, 2022, as part of the
bagian dari Pembentukan Holding dan Establishment of PLN Holding and Subholdings,
Subholding PLN, Perusahaan telah the Company has signed the following Deeds
menandatangani akta-akta sebagai berikut yang that took effect on January 1, 2023 as approved
telah berlaku efektif pada 1 Januari 2023 and/or notified to the Minister of Law and Human
sebagaimana disetujui dan/atau diberitahukan Rights as follows:
kepada Menteri Hukum dan Hak Asasi Manusia
sebagai berikut:

1. Akta pemisahan kegiatan usaha 1. Deed of spin-off of power generation


pembangkitan kepada PNP dengan nilai business activities to PNP to be
yang akan ditukar menjadi kepemilikan compensated with newly issued shares of the
saham baru Perusahaan pada PNP Company in PNP amounting to
sebesar Rp151.255.249, sesuai dengan Rp151,255,249 as per the independent
hasil penilaian Kantor Jasa Penilai Publik appraisal of Kantor Jasa Penilai Publik
Rengganis, Hamid, & Rekan (“KJPP Rengganis, Hamid, & Rekan (“KJPP RHR”),
RHR”), yang tertuang dalam Akta Notaris as stated in the Notarial Deeds No. 70 and
No. 70 dan No. 76 tanggal 30 Desember No. 76 dated December 30, 2022 of
2022 dari Muhammad Hanafi, S.H. Muhammad Hanafi, S.H.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/7 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)

d. Pembentukan struktur subholding (lanjutan) d. Establishment of subholding structure


(continued)

2. Akta pemisahan kegiatan usaha 2. Deed of spin-off of power generation


pembangkitan dengan IP dengan nilai yang business activities to IP to be compensated
akan ditukar menjadi kepemilikan saham with newly issued shares of the Company in
baru Perusahaan pada IP sebesar IP amounting to Rp175,974,993 as per the
Rp175.974.993, sesuai dengan hasil independent appraisal of KJPP RHR, as
penilaian KJPP RHR yang tertuang dalam stated in Notarial Deeds No. 71 and No. 77
Akta Notaris No. 71 dan No. 77 dari tanggal dated December 30, 2022 of Muhammad
30 Desember 2022 dari Muhammad Hanafi, S.H.
Hanafi, S.H.
3. Akta pemasukan (inbreng) ke dalam EPI 3. Deed of in-kind capital participation to EPI
berupa seluruh kepemilikan saham in the form of the Company’s entire share-
Perusahaan pada PLN GG dan BAG ownership in PLN GG and BAG to be
dengan nilai yang akan ditukar menjadi compensated with newly issued shares in
kepemilikan saham baru sebesar the value of Rp2,273,717 as per the
Rp2.273.717, sesuai dengan hasil penilaian independent appraisal of KJPP RHR, as
KJPP RHR, yang tertuang dalam Akta stated in Notarial Deeds No. 72 and No. 78
Notaris No. 72 dan No. 78 tanggal 30 dated December 30, 2022 of Muhammad
Desember 2022 dari Muhammad Hanafi, Hanafi, S.H.
S.H.

Dampak kejadian di atas, informasi atau fakta The impact of the above events, information or
material terhadap kegiatan operasional, hukum, material facts on the operational activity, legal,
kondisi keuangan, atau kelangsungan usaha Grup financial condition or the business sustainability of
sebagai berikut: the Group, is as follows:

1. Pembentukan Holding dan Subholding PLN 1. The establishment of PLN Holding and
diharapkan akan membangun struktur PLN Subholding is expected to build a PLN Group
Group yang ramping, lincah, efisien, dan structure that is lean, agile, efficient, and
memberikan nilai tambah, agar setiap create value creation, and to enable each of
Subholding memiliki fokus pada kegiatan the Subholdings, to focus on their respective
usaha masing-masing, meminimalisir risiko business activities, ring fencing of risk at
usaha (ring fencing) di tingkat Subholding, Subholding level, and flexibility in obtaining
dan fleksibilitas dalam memperoleh kerja strategic partnerships.
sama strategis.
2. Setelah transaksi tersebut di atas 2. Upon the consummation of the transaction,
dilaksanakan, Perusahaan akan memiliki the Company will have additional share
tambahan kepemilikan saham pada anak ownership in consolidated subsidiaries, which
perusahaan terkonsolidasi, yaitu PNP, IP, are PNP, IP, and EPI in the value as
dan EPI dalam nilai masing-masing tersebut mentioned above. This is expected to provide
di atas, di mana hal ini diharapkan akan additional value to the Group and have a
memberikan nilai tambah bagi Grup serta positive impact for the continuity of the
memberikan dampak positif bagi Group’s business activities.
keberlangsungan kegiatan usaha Grup.

Berdasarkan Keputusan Direktur Jenderal Pajak Based on the Decree of the Director General of
Nomor Kep-86/WPJ.19/2023 tanggal 15 Juni Taxes No. Kep-86/WPJ.19/2023 dated June 15,
2023, Direktorat Jenderal Pajak menyetujui 2023, the Directorate General of Taxes approved
penggunaan nilai buku atas pengalihan harta the use of book value for the transfer of assets
dalam rangka pengambilalihan usaha yang for the purposes of a business take over which
berlaku mulai tanggal 1 Januari 2023. became effective on January 1, 2023.

Berdasarkan Keputusan Direktur Jenderal Based on the Decree of the Director General of
Pajak Nomor Kep-87/WPJ.19/2023 tanggal 15 Taxes No. Kep-87/WPJ.19/2023 dated June 15,
Juni 2023, Direktorat Jenderal Pajak menyetujui 2023, the Directorate General of Taxes approved
penggunaan nilai buku atas pengalihan harta the use of book value for the transfer of assets
dalam rangka pemekaran usaha yang berlaku for the purposes of partial spin-off of which
mulai tanggal 1 Januari 2023. became effective on January 1, 2023.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/8 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

2. PENERAPAN PRINSIP AKUNTANSI YANG 2. IMPLEMENTATION OF INDONESIAN


BERLAKU UMUM DI INDONESIA (“PABU”) GENERALLY ACCEPTED ACCOUNTING
PRINCIPLES (“GAAP”)

a. Penerapan Peraturan Otoritas Jasa Keuangan a. Implementation of Financial Services


No. 6/POJK.04/2017 tentang Perlakuan Authority Regulation No. 6/POJK.04/2017
Akuntansi atas Transaksi Berdasarkan regarding Accounting Treatment for
Perjanjian Jual Beli Tenaga Listrik (“POJK No. Transactions Based on Power Purchase
6”) Agreements (“POJK No. 6”)

Grup mengadakan perjanjian jual beli tenaga The Group has entered into Power Purchase
listrik, yakni Perjanjian Jual Beli Tenaga Listrik Agreements (“PPAs”) and Energy Sales
(“PPA”) dan Kontrak Penjualan Energi (“ESC”), Contracts (“ESCs”), with Independent Power
dengan Penyedia dan Pengembang Tenaga Producers (“IPPs”). Those IPPs are holders of
Listrik Swasta (“IPP”). IPP tersebut merupakan Electricity Business Licences for public use.
pemegang Izin Usaha Ketenagalistrikan untuk
kepentingan umum.

Sebelum 1 Januari 2016, Grup menerapkan Before January 1, 2016, the Group applied
Interpretasi Standar Akuntansi Keuangan Interpretation of Financial Accounting Standards
(“ISAK”) No. 8: “Penentuan Apakah Suatu (“IFAS”) No. 8: “Determining Whether an
Perjanjian Mengandung Suatu Sewa” (“ISAK Arrangement Contains a Lease” (“IFAS No. 8”)
No. 8”) dalam mengevaluasi apakah PPA dan in evaluating whether PPAs and ESCs with
ESC dengan IPP mengandung unsur sewa IPPs contain a lease (Note 3.k).
(Catatan 3.k).

Pada tanggal 1 Maret 2017, Otoritas Jasa On March 1, 2017, the Financial Services
Keuangan (“OJK”) menerbitkan POJK No. 6 Authority (“FSA”) issued POJK No. 6 which is
yang berlaku bagi Emiten dan Perusahaan applicable for listed and public companies.
Publik. Berdasarkan POJK No. 6, transaksi Based on POJK No. 6, transactions based on a
berdasarkan perjanjian jual beli tenaga listrik PPA are treated as sale and purchase
diperlakukan sebagai transaksi jual beli, transactions, even though the PPAs contain
meskipun perjanjian jual beli tenaga listrik substance other than that of sale and purchase
tersebut mengandung substansi selain jual beli of electricity. POJK No. 6 applies prospectively
listrik. POJK No. 6 berlaku secara prospektif for the year beginning on January 1, 2017 and
untuk tahun buku yang dimulai sejak early implementation is allowed for the year
1 Januari 2017 dan mengizinkan perlakuan beginning on January 1, 2016. POJK No. 6 is
lebih awal sejak 1 Januari 2016. POJK No. 6 valid until the end of the assignment on
berlaku sampai akhir tahun buku berakhirnya acceleration of electricity infrastructure
penugasan untuk percepatan pembangunan development in accordance with Presidential
infrastruktur ketenagalistrikan berdasarkan Regulation No. 14 year 2017.
Peraturan Presiden No. 14 tahun 2017.

Grup memutuskan untuk menerapkan lebih The Group decided to implement POJK No. 6
awal POJK No. 6 secara prospektif sejak early prospectively beginning on January 1,
1 Januari 2016. Oleh karena itu transaksi 2016. Therefore, the electricity sale and
berdasarkan perjanjian jual beli tenaga listrik purchase transactions based on PPAs which
yang mengandung sewa (Catatan 3.k), mulai contain a lease (Note 3.k), since January 1,
1 Januari 2016 disajikan sebagai pembelian 2016 are presented as purchase of electricity in
tenaga listrik dalam laporan laba rugi dan the consolidated statement of profit or loss and
penghasilan komprehensif lain konsolidasian other comprehensive income when incurred. On
pada tahun terjadinya. Pada tanggal January 1, 2016, the Group also adjusted the
1 Januari 2016, Grup juga melakukan related assets and liabilities.
penyesuaian atas aset dan liabilitas terkait.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/9 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

2. PENERAPAN PRINSIP AKUNTANSI YANG 2. IMPLEMENTATION OF INDONESIAN


BERLAKU UMUM DI INDONESIA (“PABU”) GENERALLY ACCEPTED ACCOUNTING
(lanjutan) PRINCIPLES (“GAAP”) (continued)

a. Penerapan Peraturan Otoritas Jasa Keuangan a. Implementation of Financial Services


No. 6/POJK.04/2017 tentang Perlakuan Authority Regulation No. 6/POJK.04/2017
Akuntansi atas Transaksi Berdasarkan regarding Accounting Treatment for
Perjanjian Jual Beli Tenaga Listrik (“POJK No. Transactions Based on Power Purchase
6”) (lanjutan) Agreements (“POJK No. 6”) (continued)

Jumlah bersih penyesuaian atas aset dan The net adjustments on related assets and
liabilitas terkait sebesar Rp43.428.454 dan telah liabilities amounted to Rp43,428,454 and were
dicatat sebagai penyesuaian saldo laba pada recorded as an adjustment to retained earnings
tanggal 1 Januari 2016, dengan rincian sebagai on January 1, 2016, the details of which are as
berikut: follows:

1 Januari 2016 1 Januari 2016


sebelum Penyesuaian setelah
penyesuaian/ saldo awal/ penyesuaian/
January 1, 2016 Beginning January 1, 2016
before balance after
adjustment adjustment adjustment

Aset tetap 1,187,879,590 (72,227,600) 1,115,651,990 Property, plant and equipment


Aset pajak tangguhan 29,088,271 (14,787,769) 14,300,502 Deferred tax assets

1,216,967,861 (87,015,369) 1,129,952,492


Liabilitas jangka panjang Non-current liabilities
Utang listrik swasta 7,093,280 755,783 7,849,063 Electricity purchase payable
Utang sewa 149,621,763 (128,065,144) 21,556,619 Lease Liabilities

Liabilitas jangka pendek Current liabilities


Utang sewa 6,759,138 (3,313,534) 3,445,604 Lease liabilities
Biaya masih harus dibayar 10,627,055 (2,216,084) 8,410,971 Accrued expenses
Utang listrik swasta 311,196 9,968 321,164 Electricity purchase payable
Utang usaha Trade payables
Pihak berelasi 8,910,438 380,409 9,290,847 Related parties
Pihak ketiga 17,715,563 1,998,142 19,713,705 Third parties
Utang lain-lain 20,188,608 6,637 20,195,245 Other payables

221,227,041 (130,443,823) 90,783,218

The effect of POJK No. 6


Dampak penerapan POJK No. 6 application on beginning
terhadap saldo laba awal 43,428,454 retained earnings

Mulai 1 Januari 2020, Grup menerapkan Starting January 1, 2020, the Group
Pernyataan Standar Akuntansi Keuangan implemented Statement of Financial Accounting
(“PSAK”) 73, “Sewa”. Standar akuntansi ini Standards (“SFAS”) 73, “Leases”. This standard
menggantikan standar akuntansi berikut: replaced the previous accounting standards as
- PSAK No. 30: “Sewa” follows:
- ISAK No. 8: “Penentuan apakah Suatu - SFAS No. 30: “Leases”
Perjanjian Mengandung Suatu Sewa” - IFAS No. 8: “Determining Whether an
- ISAK No. 23: “Sewa Operasi-Insentif” Arrangement Contains a Lease”
- ISAK No. 24: “Evaluasi Substansi Beberapa - IFAS No. 23: “Operating Leases-Incentives”
Transaksi yang Melibatkan Suatu Bentuk - IFAS No. 24: “Evaluating the Substance of
Legal Sewa” Transactions Involving the Legal Form of a
- ISAK No. 25: “Hak atas Tanah” Lease”
- IFAS No. 25: “Land Rights”
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/10 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

2. PENERAPAN PRINSIP AKUNTANSI YANG 2. IMPLEMENTATION OF INDONESIAN


BERLAKU UMUM DI INDONESIA (“PABU”) GENERALLY ACCEPTED ACCOUNTING
(lanjutan) PRINCIPLES (“GAAP”) (continued)

a. Penerapan Peraturan Otoritas Jasa Keuangan a. Implementation of Financial Services


No. 6/POJK.04/2017 tentang Perlakuan Authority Regulation No. 6/POJK.04/2017
Akuntansi atas Transaksi Berdasarkan regarding Accounting Treatment for
Perjanjian Jual Beli Tenaga Listrik (“POJK No. Transactions Based on Power Purchase
6”) (lanjutan) Agreements (“POJK No. 6”) (continued)

Perjanjian jual beli tenaga listrik yang diikuti The PPAs entered into by the Group are still
oleh Grup tetap mengacu pada POJK No. 6 accounted for under POJK No. 6 because it
karena peraturan tersebut masih berlaku remains valid until the end of the assignment on
sampai berakhirnya penugasan untuk acceleration of electricity infrastructure
percepatan pembangunan infrastruktur development in accordance with Presidential
ketenagalistrikan berdasarkan Peraturan Regulation. Therefore, the accounting treatment
Presiden. Dengan demikian perlakuan for PPAs and ESCs with IPPs remains the
akuntansi untuk PPA dan ESC dengan IPP same as before the Group implemented SFAS
masih tetap sama seperti sebelum Grup No. 73, i.e treated as sale and purchase
menerapkan PSAK No. 73, yaitu diperlakukan transactions and hence excluded from the
sebagai transaksi jual beli dan dikecualikan dari scope of SFAS No. 73.
ruang lingkup penerapan PSAK No. 73.

b. Perubahan pada PSAK, amandemen dan b. Changes to SFAS, amendments and annual
penyesuaian tahunan yang berlaku efektif improvements effective for years beginning
untuk tahun buku yang dimulai pada atau on or after January 1, 2023
setelah tanggal 1 Januari 2023

Penerapan, amandemen dan penyesuaian The adoption of the following, amendments and
tahunan yang berlaku efektif untuk tahun buku annual improvements to accounting standards
yang dimulai pada atau setelah tanggal 1 which are effective from January 1, 2023 did not
Januari 2023 tidak menyebabkan perubahan result in substantial changes to the Group's
signifikan atas kebijakan akuntansi Grup dan accounting policies and had no material effect
tidak memberikan dampak yang material on the amounts reported in the consolidated
terhadap jumlah yang dilaporkan di laporan financial statements for the current year:
keuangan konsolidasian pada tahun berjalan:

• PSAK No. 74: “Kontrak Asuransi” • SFAS No. 74: “Insurance Contracts”
• Amandemen PSAK No. 1: “Penyajian Laporan • Amendment to SFAS No. 1: “Presentation of
Keuangan - Klasifikasi Kewajiban Lancar atau Financial Statements - Classification of
Tidak Lancar” Liabilities as Current or Non-Current”
• Amandemen PSAK No. 1: “Penyajian • Amendment to SFAS No. 1: “Presentation of
Laporan Keuangan - Pengungkapan Financial Statements - Disclosure of Accounting
Kebijakan Akuntansi” Policies”
• Amandemen PSAK No. 16: “Aset Tetap - Hasil • Amendment to SFAS No. 16: “Property, Plant
sebelum Penggunaan yang Diintensikan” and Equipment - Proceeds before Intended
Use”
• Amandemen PSAK No. 25: “Kebijakan • Amendment to SFAS No. 25: “Accounting
Akuntansi, Perubahan Estimasi Akuntansi dan Policies, Changes in Accounting Estimates and
Kesalahan - Definisi Estimasi Akuntansi” Errors - Definition of Accounting Estimates”
• Amandemen PSAK No. 46: “Pajak Penghasilan • Amendment to SFAS No. 46: “Income Taxes -
- Pajak Tangguhan terkait Aset dan Liabilitas Deferred Tax related to Assets and Liabilities
yang Timbul dari Transaksi Tunggal” Arising from a Single Transaction”
• Revisi PSAK No. 107: “Akuntansi Ijarah” • Revision to SFAS No. 107: “Ijarah Accounting”
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/11 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

2. PENERAPAN PRINSIP AKUNTANSI YANG 2. IMPLEMENTATION OF INDONESIAN


BERLAKU UMUM DI INDONESIA (“PABU”) GENERALLY ACCEPTED ACCOUNTING
(lanjutan) PRINCIPLES (“GAAP”) (continued)

b. Perubahan pada PSAK, amandemen dan b. Changes to SFAS, amendments and annual
penyesuaian tahunan yang berlaku efektif improvements of effective for years beginning
untuk tahun buku yang dimulai pada atau on or after January 1, 2023 (continued)
setelah tanggal 1 Januari 2023 (lanjutan)

Standar baru, amandemen, dan revisi yang New standards, amendments and revisions
telah diterbitkan, namun belum berlaku efektif issued but not yet effective for the financial year
untuk tahun buku yang dimulai pada 1 Januari beginning January 1, 2023 are as follows:
2023 adalah sebagai berikut:

• Amandemen PSAK No. 1: “Penyajian Laporan • Amendment to SFAS No. 1: “Presentation of


Keuangan - Liabilitas Jangka Panjang dengan Financial Statements - Long-term Liabilities with
Kovenan” Covenants”
• Amandemen PSAK No. 73: “Sewa – Kewajiban • Amendment to SFAS No. 73: “Leases – Leases
Sewa dalam Transaksi Jual dan Sewa Balik” Liability in a Sale and Leaseback Transaction”
• Amandemen PSAK No. 74: “Kontrak Asuransi • Amendment to SFAS No.74: “Insurance
tentang Penerapan Awal PSAK No. 74 dan Contracts regarding Initial Application of SFAS
PSAK No. 71 - “Informasi Komparatif” No. 74 and SFAS No. 71 - Comparative
Information”
• Revisi PSAK No. 101: “Penyajian Laporan • Revision to SFAS No. 101: “Presentation of
Keuangan Syariah” Sharia Financial Statements”
• Revisi PSAK No. 109: “Zakat, Infaq dan • Revision to SFAS No. 109: “Zakah, Infaq and
Akuntansi Sedekah” Sadaqah Accounting”

Standar baru, amandemen dan revisi di atas The above new standard, amendments and
berlaku efektif mulai 1 Januari 2024, kecuali untuk revisions are effective beginning January 1, 2024,
PSAK No. 74 dan Amandemen PSAK No. 74 except for SFAS No. 74 and Amendment to SFAS
yang berlaku efektif mulai 1 Januari 2025, tetapi No. 74 which are effective beginning January 1,
penerapan dini diperkenankan. 2025, but early adoption is permitted.

Pada tanggal penyelesaian laporan keuangan As at the completion date of these consolidated
konsolidasian ini, Grup sedang mempelajari financial statements, the Group is evaluating the
dampak yang mungkin timbul dari penerapan potential impact of these new standard,
standar baru, amandemen, revisi dan amendments, revisions and annual improvements
penyesuaian tahunan pada laporan keuangan on the Group’s consolidated financial statements.
konsolidasian Grup.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/12 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN 3. SIGNIFICANT ACCOUNTING POLICIES

Berikut ini adalah kebijakan akuntansi penting yang Presented below are the significant accounting
diterapkan dalam penyusunan laporan keuangan policies adopted in preparing the consolidated
konsolidasian Grup. Kebijakan ini telah diaplikasikan financial statements of the Group. These policies
secara konsisten terhadap semua tahun yang have been consistently applied to all of the years
disajikan, kecuali dinyatakan lain. presented, unless otherwise stated.

a. Pernyataan kepatuhan a. Statement of compliance

Sejak 1 Januari 2016, laporan keuangan Since January 1, 2016, the consolidated
konsolidasian telah disusun dan disajikan financial statements have been prepared and
sesuai dengan PABU, yang mencakup sebagai presented in accordance with Indonesian
berikut: GAAP, which covers the following:
(a) Standar Akuntansi Keuangan yang (a) Financial Accounting Standards issued by
dikeluarkan oleh Dewan Standar Akuntansi the Financial Accounting Standards Board -
Keuangan - Ikatan Akuntan Indonesia Indonesian Institute of Accountants
(“DSAK-IAI”), yang meliputi PSAK dan (“DSAK-IAI”), which cover SFAS and IFAS;
ISAK;
(b) Standar Akuntansi Keuangan Syariah yang (b) Syariah Financial Accounting Standards
dikeluarkan oleh Dewan Standar Akuntansi issued by the Syariah Accounting
Syariah - Ikatan Akuntan Indonesia Standards Board - Indonesian Institute of
(“DSAS-IAI”), yang meliputi Standar Accountants (“DSAS-IAI”), which cover
Akuntansi Syariah (“SAS”); dan Syariah Accounting Standards (“SAS”); and
(c) Ketentuan akuntansi keuangan yang (c) Applicable Capital Market Regulations as
ditetapkan oleh OJK, terdiri dari Peraturan stated by the FSA, including FSA
OJK No. VIII.G.7 tentang Pedoman Regulation No. VIII.G.7 consisting of
Penyajian Laporan Keuangan, Keputusan Guidance for the Presentation of Financial
Ketua Badan Pengawas Pasar Modal - Statements, Decree of Chairman of the
Lembaga Keuangan (“Bapepam-LK”) No. Capital Market and Financial Institutions
KEP-347/BL/2012 tentang Penyajian dan Supervisory Board (“CM-FISB”) No. KEP-
Pengungkapan Laporan Keuangan Emiten 347/BL/2012 regarding Presentation and
atau Perusahaan Publik, dan Peraturan Disclosure of Financial Statements of
OJK No. 6 POJK.04/2017 tentang Listed or Public Companies, and FSA
Perlakuan Akuntansi atas Transaksi Regulation No. 6 POJK.04/2017 regarding
Berdasarkan Perjanjian Jual Beli Tenaga Accounting Treatment for Transactions
Listrik. Based on Power Purchase Agreements.

b. Dasar penyusunan laporan keuangan b. Basis of preparation of the consolidated


konsolidasian financial statements

Dasar penyusunan laporan keuangan The consolidated financial statements, except


konsolidasian, kecuali untuk laporan arus kas for the consolidated statements of cash flows,
konsolidasian adalah dasar akrual. Mata uang have been prepared using the accrual basis of
penyajian yang digunakan untuk penyusunan accounting. The presentation currency used in
laporan keuangan konsolidasian adalah mata the preparation of the consolidated financial
uang Rupiah (“Rp”), yang juga merupakan mata statements is the Rupiah (“Rp”), which is also
uang fungsional Grup. Laporan keuangan the functional currency of the Group. The
konsolidasian disusun dan disajikan preparation and presentation of the
berdasarkan asumsi kelangsungan usaha dan consolidated financial statements are based on
dengan pengukuran nilai historis, kecuali the going concern assumption and the
beberapa akun tertentu disusun berdasarkan measurement basis is historical cost, except for
pengukuran lain sebagaimana diuraikan dalam certain accounts which are measured on the
kebijakan akuntansi masing-masing akun basis described in the related accounting
tersebut. policies.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/13 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

b. Dasar penyusunan laporan keuangan b. Basis of preparation of the consolidated


konsolidasian (lanjutan) financial statements (continued)

Penyusunan laporan keuangan konsolidasian The preparation of consolidated financial


sesuai dengan Standar Akuntansi Keuangan di statements in conformity with Indonesian
Indonesia mengharuskan penggunaan estimasi Financial Accounting Standards requires the use
dan asumsi. Hal tersebut juga mengharuskan of certain critical accounting estimates and
manajemen untuk membuat pertimbangan dalam assumptions. It also requires management to
proses penerapan kebijakan akuntansi Grup. exercise its judgement in the process of applying
Area yang kompleks atau memerlukan tingkat the Group’s accounting policies. The areas
pertimbangan yang lebih tinggi atau area di mana involving a higher degree of judgement or
asumsi dan estimasi dapat berdampak signifikan complexity, or areas where assumptions and
terhadap laporan keuangan konsolidasian estimates are significant to the consolidated
diungkapkan di Catatan 4. financial statements are disclosed in Note 4.

c. Prinsip-prinsip konsolidasian c. Principles of consolidation

i. Entitas anak i. Subsidiaries

i.1. Konsolidasi i.1. Consolidation

Entitas anak merupakan semua entitas Subsidiaries are all entities (including
(termasuk entitas bertujuan khusus), structured entities), over which the
dimana Grup memiliki pengendalian. Group has control. The Group controls
Grup mengendalikan suatu entitas an entity when the Group is exposed to,
ketika Grup memiliki hak atas imbal or has rights to, variable returns from its
hasil variabel dari keterlibatannya involvement with the entity and has the
dengan suatu entitas dan memiliki ability to affect those returns through its
kemampuan untuk mempengaruhi imbal power over the entity.
hasil tersebut melalui kekuasaannya
atas entitas tersebut.

Entitas anak dikonsolidasi sejak tanggal Subsidiaries are consolidated from the
pengendalian beralih kepada Grup dan date on which control is transferred to
tidak lagi dikonsolidasi sejak tanggal the Group and are de-consolidated from
hilangnya pengendalian. the date on which that control ceases.

Saldo, transaksi, penghasilan, dan Intragroup balances, transactions,


beban intra kelompok usaha dieliminasi. income and expenses are eliminated.
Keuntungan dan kerugian hasil dari Profits and losses resulting from
transaksi intra kelompok usaha yang intragroup transactions that are
diakui dalam aset juga dieliminasi. recognised in assets are also
Kebijakan akuntansi entitas anak telah eliminated. The accounting policies of
diubah seperlunya untuk memastikan subsidiaries have been amended where
konsistensi penerapan kebijakan oleh necessary to ensure consistency with
Grup. the policies adopted by the Group.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/14 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

c. Prinsip-prinsip konsolidasian (lanjutan) c. Principles of consolidation (continued)

i. Entitas anak (lanjutan) i. Subsidiaries (continued)

i.2. Akuisisi i.2. Acquisition

Grup menerapkan metode akuisisi untuk The Group applies the acquisition
mencatat setiap kombinasi bisnis. method to account for business
Imbalan yang dialihkan untuk combinations. The consideration
mengakuisisi entitas anak adalah nilai transferred for the acquisition of a
wajar seluruh aset yang dialihkan, subsidiary is the fair value of the assets
liabilitas yang diakui oleh pihak transferred, the liabilities incurred to the
pengakuisisi kepada pemilik sebelumnya former owners of the acquiree and the
dari entitas yang diakuisisi dan equity interests issued by the Group.
kepentingan ekuitas yang diterbitkan The consideration transferred includes
oleh Grup. Imbalan yang dialihkan the fair value of any asset or liability
termasuk nilai wajar setiap aset dan resulting from a contingent consideration
liabilitas yang dihasilkan dari suatu arrangement. The identifiable assets
kesepakatan imbalan kontinjensi. Aset acquired, liabilities and contingent
teridentifikasi, liabilitas dan liabilitas liabilities assumed in a business
kontinjensi yang diambil alih, yang combination are measured initially at
diperoleh dalam kombinasi bisnis diukur their fair values as at the acquisition
pada awalnya sebesar nilai wajar pada date
tanggal akuisisi.

Grup mengakui kepentingan non- The Group recognises any non-


pengendali pada pihak yang diakuisisi controlling interest in the acquiree on an
baik sebesar nilai wajar atau sebesar acquisition-by-acquisition basis, either at
bagian proporsional kepentingan non- fair value or at the non-controlling
pengendali atas aset neto teridentifikasi interest’s proportionate share of the
pihak yang diakuisisi. Kepentingan non- acquiree’s identifiable net assets. Non-
pengendali disajikan di ekuitas dalam controlling interests are reported as
laporan posisi keuangan konsolidasian, equity in the consolidated statements of
terpisah dari ekuitas pemilik entitas financial position, separate from the
induk. owner of the parent entity.

Biaya terkait akuisisi dibebankan pada Acquisition-related costs are expensed


saat terjadinya. as incurred.

Jika kombinasi bisnis diperoleh secara If the business combination is achieved


bertahap, Grup akan mengukur in stages, the Group will remeasure its
kepentingan ekuitas yang sebelumnya previously held equity interest in the
dimiliki pada pihak yang diakuisisi acquiree at its fair value at its acquisition
sebesar nilai wajar pada tanggal akuisisi date and recognise the resulting gain or
dan mengakui keuntungan atau kerugian loss, if any, in profit or loss. Any
yang dihasilkan, jika ada, dalam laba contingent consideration to be
rugi. Imbalan kontinjensi yang masih transferred by the Group is recognised
harus dialihkan oleh Grup diakui sebesar at its fair value as at the acquisition date.
nilai wajar pada tanggal akuisisi. Subsequent changes to the fair value of
Perubahan selanjutnya atas nilai wajar the contingent consideration that is
imbalan kontinjensi yang diakui sebagai deemed to be an asset or a liability are
aset atau liabilitas dan dicatat dalam recognised in profit or loss. A contingent
laba rugi. Imbalan kontinjensi yang consideration that is classified as equity
diklasifikasikan sebagai ekuitas tidak is not remeasured and its subsequent
diukur kembali dan penyelesaian settlement is accounted for within equity.
selanjutnya diperhitungkan dalam
ekuitas.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/15 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

c. Prinsip-prinsip konsolidasian (lanjutan) c. Principles of consolidation (continued)

i. Entitas anak (lanjutan) i. Subsidiaries (continued)

i.2. Akuisisi (lanjutan) i.2. Acquisition (continued)

Selisih lebih antara imbalan yang The excess of the consideration


dialihkan, jumlah setiap kepentingan transferred, the amount of any non-
non-pengendali dalam pihak yang controlling interests in the acquiree and
diakuisisi, dan nilai wajar pada tanggal the acquisition-date fair value of any
akuisisi dari kepemilikan ekuitas yang previous equity interest in the acquiree
sebelumnya dimiliki oleh pihak over the fair value of the Group’s share
pengakuisisi pada pihak yang diakuisisi, of the identifiable net assets acquired
dibandingkan dengan nilai wajar bagian are recorded as goodwill. If these
Grup atas aset bersih teridentifikasi yang amounts are less than the fair value of
diakuisisi, dicatat sebagai goodwill. Jika the net identifiable assets of the
jumlah tersebut lebih kecil dari nilai wajar subsidiary acquired and the
atas aset bersih teridentifikasi entitas measurement of all amounts has been
anak yang diakuisisi dan pengukuran reviewed, in the case of a bargain
atas seluruh jumlah tersebut telah purchase, the difference is recognised
ditelaah, dalam hal pembelian dengan directly in profit or loss.
diskon, selisih tersebut diakui secara
langsung dalam laba rugi.

ii. Perubahan kepemilikan atas entitas anak ii. Changes in ownership interest in
tanpa kehilangan pengendalian subsidiaries without loss of control

Transaksi dengan kepentingan non- Transactions with non-controlling interests


pengendali yang tidak mengakibatkan that do not result in a loss of control are
hilangnya pengendalian dicatat sebagai accounted for as equity transactions. The
transaksi ekuitas. Selisih antara nilai wajar difference between the fair value of any
imbalan yang dibayarkan dan bagiannya consideration paid and the relevant share
atas jumlah tercatat aset neto yang acquired of the carrying amount of net
diperoleh dicatat dalam ekuitas. Keuntungan assets of the subsidiary is recorded in
atau kerugian atas pelepasan kepada equity. Gains or losses on disposals to non-
kepentingan non-pengendali juga dicatat controlling interests are also recorded in
pada ekuitas. equity.

iii. Pelepasan entitas anak iii. Disposal of subsidiaries

Ketika Grup kehilangan pengendalian atas When the Group loses control of a
entitas anak, Grup menghentikan subsidiary, the Group derecognises the
pengakuan aset (termasuk setiap goodwill) assets (including any goodwill) and liabilities
dan liabilitas entitas anak pada nilai of the subsidiary at their carrying amounts
tercatatnya ketika pengendalian hilang. as at the date on which control is lost.
Jumlah yang sebelumnya diakui dalam Amounts previously recognised in other
penghasilan komprehensif lain juga comprehensive income are also reclassified
direklasifikasi ke laba rugi atau dialihkan to profit or loss, or transferred directly to
secara langsung ke saldo laba jika retained earnings if required under other
disyaratkan oleh PSAK lain. SFAS.

Sisa investasi pada entitas anak terdahulu Any investment retained in the former
diakui sebesar nilai wajarnya. Setiap subsidiary is recognised at its fair value.
perbedaan antara nilai tercatat sisa investasi The difference between the carrying amount
pada tanggal hilangnya pengendalian dan of the investment retained on the date when
nilai wajarnya diakui dalam laba rugi. the control is lost and its fair value is
recognised in profit or loss.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/16 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

c. Prinsip-prinsip konsolidasian (lanjutan) c. Principles of consolidation (continued)

iv. Akuntansi atas entitas asosiasi dan iv. Accounting for associates and joint
ventura bersama ventures

Entitas asosiasi adalah suatu entitas dimana An associate is an entity over which the
Grup mempunyai pengaruh signifikan, tetapi Group has significant influence, but not
tidak mengendalikan, dan biasanya Grup control, and is generally accompanied by a
memiliki 20% atau lebih hak suara, tetapi shareholding giving rise to voting rights of
tidak melebihi 50% hak suara. Investasi 20% or greater but not exceeding 50%.
pada entitas asosiasi dicatat pada laporan Investment in associates is accounted for in
keuangan konsolidasian menggunakan the consolidated financial statements using
metode ekuitas dikurangi kerugian the equity method less impairment losses, if
penurunan nilai, jika ada. any.

Ventura bersama merupakan pengaturan A joint venture is a joint arrangement in


bersama antara beberapa pihak yang which the parties that share joint control
melakukan kesepakatan pengendalian have rights to the net assets of the
bersama yang memiliki hak atas aset neto arrangement. Joint ventures are accounted
pengaturan tersebut. Ventura bersama ini for using the equity method less impairment
menggunakan metode ekuitas dikurangi losses, if any.
kerugian penurunan nilai, jika ada.

- Akuisisi - Acquisitions

Investasi pada entitas asosiasi atau Investment in an associate or a joint


ventura bersama pada awalnya diakui venture is initially recognised at cost. The
sebesar biaya perolehan. Biaya perolehan cost of an acquisition is measured at the
diukur berdasarkan nilai wajar aset yang fair value of the assets transferred, equity
diserahkan, instrumen ekuitas yang instruments issued or liabilities incurred or
diterbitkan atau liabilitas yang timbul atau assumed as at the date of exchange, plus
diambil alih pada tanggal akuisisi, costs directly attributable to the
ditambah biaya yang berhubungan acquisition.
langsung dengan akuisisi.

Goodwill pada akuisisi entitas asosiasi Goodwill on the acquisition of an associate


atau ventura Bersama merupakan selisih or a joint venture represents the excess of
lebih yang terkait dengan biaya perolehan the cost of acquisition of the associate or
investasi pada entitas asosiasi atau joint venture over the Group’s share of the
ventura bersama dengan bagian Grup fair value of the identifiable net assets of
atas nilai wajar neto aset teridentifikasi dari the associate or joint venture and is
entitas asosiasi atau ventura bersama dan included in the carrying amount of the
dimasukkan dalam jumlah tercatat investment.
investasi.

- Metode ekuitas - Equity method of accounting

Dalam menerapkan metode ekuitas, In applying the equity method of


bagian Grup atas laba rugi entitas asosiasi accounting, the Group’s share of its
atau ventura Bersama setelah perolehan associate’s or joint venture’s post-
diakui dalam laba rugi, dan bagian Grup acquisition profit or loss is recognised in
atas penghasilan komprehensif lain profit or loss and its share of post-
setelah tanggal perolehan diakui dalam acquisition other comprehensive income is
penghasilan komprehensif lain. recognised in other comprehensive
income.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/17 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

c. Prinsip-prinsip konsolidasian (lanjutan) c. Principles of consolidation (continued)

iv. Akuntansi atas entitas asosiasi dan iv. Accounting for associates and joint
ventura bersama (lanjutan) ventures (continued)

- Metode ekuitas (lanjutan) - Equity method of accounting


(continued)

Perubahan dan penerimaan distribusi dari These post-acquisition movements and


entitas asosiasi atau ventura bersama distributions received from an associate or
setelah tanggal perolehan disesuaikan a joint venture are adjusted against the
terhadap nilai tercatat investasi. carrying amounts of the investment.

Jika bagian Grup atas rugi entitas asosiasi When the Group’s share of the losses of
atau ventura bersama sama dengan atau an associate or a joint venture equals or
melebihi kepentingannya pada entitas exceeds its interest in the associate or
asosiasi atau ventura bersama, termasuk joint venture, including any other
piutang tidak lancar tanpa jaminan, maka unsecured non-current receivables, the
Grup menghentikan pengakuan bagiannya Group does not recognise further losses,
atas rugi lebih lanjut, kecuali Grup memiliki unless it has obligations to make or has
kewajiban untuk melakukan pembayaran made payments on behalf of the associate
atau telah melakukan pembayaran atas or joint venture.
nama entitas asosiasi atau ventura
bersama.

Keuntungan yang belum direalisasi atas Unrealised gains on transactions between


transaksi antara Grup dengan entitas the Group and its associates or joint
asosiasi atau ventura bersama dieliminasi ventures are eliminated to the extent of
sebesar bagian Grup dalam entitas the Group’s interest in the associate or
asosiasi atau ventura bersama tersebut. joint venture. Unrealised losses are also
Kerugian yang belum direalisasi juga eliminated unless the transaction provides
dieliminasi kecuali transaksi tersebut evidence of the impairment of the asset
memberikan bukti penurunan nilai atas being transferred. The accounting policies
aset yang ditransfer. Kebijakan akuntansi of the associate or joint venture have been
entitas asosiasi atau ventura bersama changed where necessary to ensure
akan disesuaikan, apabila diperlukan, agar consistency with the accounting policies
konsisten dengan kebijakan akuntansi adopted by the Group.
Grup.

Dividen yang akan diterima dari entitas Dividend receivables from an associate or
asosiasi atau ventura bersama diakui a joint venture are recognised as
sebagai pengurang jumlah tercatat reductions in the carrying amount of the
investasi. investment.

Pada setiap tanggal pelaporan, Grup At each reporting date, the Group
menentukan apakah terdapat bukti objektif determines whether there is any objective
bahwa telah terjadi penurunan nilai atas evidence that the investment in an
investasi pada entitas asosiasi atau associate or joint venture is impaired. If
ventura bersama. Jika bukti tersebut ada, any such evidence exists, the Group
maka Grup menghitung besarnya calculates the amount of impairment as
penurunan nilai sebagai selisih antara the difference between the recoverable
jumlah yang terpulihkan dan nilai tercatat amount of the associate or the joint
atas investasi pada entitas asosiasi atau venture and its carrying amount and
ventura bersama dan mengakui selisih recognises the amount in profit or loss.
tersebut pada laba rugi.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/18 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

c. Prinsip-prinsip konsolidasian (lanjutan) c. Principles of consolidation (continued)

iv. Akuntansi atas entitas asosiasi dan iv. Accounting for associates and joint
ventura bersama (lanjutan) ventures (continued)

- Pelepasan - Disposals

Investasi pada entitas asosiasi atau An investment in an associate or a joint


ventura bersama dihentikan venture is derecognised when the Group
pengakuannya apabila Grup tidak lagi loses significant influence and any
memiliki pengaruh signifikan. Grup retained equity interest in the entity is
mengukur investasi yang tersisa sebesar remeasured at its fair value. The
nilai wajar. Selisih antara jumlah tercatat difference between the carrying amount of
investasi yang tersisa pada tanggal the retained interest at the date when
hilangnya pengaruh signifikan dan nilai significant influence is lost and its fair
wajarnya diakui dalam laba rugi. value is recognised in profit or loss.

Keuntungan dan kerugian yang timbul dari Gains and losses arising from partial
pelepasan sebagian atau dilusi yang disposal or dilution of an investment in an
timbul pada investasi pada entitas asosiasi associate and a joint venture in which
dan ventura bersama dimana pengaruh significant influence is retained are
signifikan masih dipertahankan diakui recognised in profit or loss, and only a
dalam laba rugi dan hanya suatu bagian proportionate share of the amount
proporsional atas jumlah yang telah diakui previously recognised in other
sebelumnya pada penghasilan comprehensive income is reclassified to
komprehensif lain yang direklasifikasi ke profit or loss where appropriate.
laba rugi.

d. Goodwill d. Goodwill

Goodwill timbul dari akuisisi entitas anak dan Goodwill arises from the acquisition of
merupakan selisih imbalan yang ditransfer subsidiaries and represents the excess of the
terhadap kepemilikan dalam nilai wajar neto consideration transferred over the interest in the
atas aset, liabilitas, dan liabilitas kontinjensi net fair value of the net identifiable assets,
teridentifikasi dan nilai wajar kepentingan non- liabilities and contingent liabilities of the
pengendali pada pihak diakuisisi. acquiree and the fair value of the non-
controlling interest in the acquiree.

Untuk pengujian penurunan nilai, goodwill yang For the purposes of impairment testing, goodwill
diperoleh dalam kombinasi bisnis dialokasikan acquired in a business combination is allocated
pada setiap Unit Penghasil Kas (“UPK”), atau to each Cash-Generating Unit (“CGU”), or group
kelompok UPK, yang diharapkan dapat of CGUs, that is expected to benefit from the
memberikan manfaat dari sinergi kombinasi synergies of the combination. Each CGU or
bisnis tersebut. Setiap unit atau kelompok unit group of CGUs to which the goodwill is
yang memperoleh alokasi goodwill allocated represents the lowest level within the
menunjukkan tingkat terendah dalam entitas entity at which goodwill is monitored for internal
yang goodwill-nya dipantau untuk tujuan management purposes. Goodwill is monitored
manajemen internal. Goodwill dipantau pada at the operating segment level.
level segmen operasi.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/19 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

e. Penjabaran mata uang asing e. Foreign currency translation

i. Mata uang fungsional dan penyajian i. Functional and presentation currency

Akun-akun yang disertakan dalam laporan Items included in the financial statements of
keuangan setiap entitas anggota Grup each of the Group’s entities are measured
diukur menggunakan mata uang dari using the currency of the primary economic
lingkungan ekonomi utama dimana entitas environment in which the relevant entity
tersebut beroperasi (“mata uang operates (the “functional currency”). The
fungsional”). Laporan keuangan consolidated financial statements are
konsolidasian disajikan dalam Rp, yang presented in Rp, which is the Company’s
merupakan mata uang fungsional functional currency and the Group’s
Perusahaan dan penyajian Grup. presentation currency.

ii. Transaksi dan saldo ii. Transactions and balances

Transaksi dalam mata uang asing Foreign currency transactions are


dijabarkan menjadi mata uang fungsional translated into the functional currency using
menggunakan kurs yang berlaku pada the exchange rates prevailing as at the date
tanggal transaksi. Pada tanggal pelaporan, of the transactions. As at the reporting date,
setiap aset dan liabilitas moneter dalam monetary assets and liabilities denominated
mata uang asing disesuaikan untuk in foreign currency were adjusted to reflect
mencerminkan kurs yang berlaku pada the exchange rates prevailing at this date.
tanggal tersebut. Keuntungan dan kerugian Foreign exchange gains and losses
selisih kurs yang timbul dari penyelesaian resulting from the settlement of such
transaksi dalam mata uang asing dan dari transactions and from the translation at
penjabaran aset dan liabilitas moneter year-end exchange rates of monetary
dalam mata uang asing menggunakan kurs assets and liabilities denominated in foreign
yang berlaku pada akhir tahun pelaporan currencies are recognised in profit or loss.
diakui dalam laba rugi.

Kurs yang digunakan pada tanggal laporan As at the consolidated statement of


posisi keuangan konsolidasian, berdasarkan financial position dates, the exchange rates
kurs penutup yang berlaku pada tanggal used, based on the exchange rates
laporan posisi keuangan konsolidasian yang prevailing at the date of the consolidated
diterbitkan Bank Indonesia, adalah sebagai statement of financial position published by
berikut: Bank Indonesia were as follows:

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022
Kurs tengah/ Kurs tengah/
Middle rate*) Middle rate*)

Yen Jepang (JPY) 104 118 Japan Yen (JPY)


Dolar AS (USD) 15,000 15,592 US Dollars (USD)
Euro (EUR) 16,409 16,609 Euro (EUR)
Franc Swiss (CHF) 16,769 16,865 Swiss Franc (CHF)
Dolar Kuwait (KWD) 48,822 51,350 Kuwait Dollars (KWD)

*) dalam jumlah penuh *) in full amount


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/20 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

e. Penjabaran mata uang asing (lanjutan) e. Foreign currency translation (continued)

iii. Entitas dalam Grup iii. Group companies

Hasil usaha operasi dan posisi keuangan The results of the operations and financial
dari seluruh entitas anak Grup (tidak ada position of all of the Group’s subsidiaries
yang mata uang fungsionalnya mata uang (none of which has the currency of a
dari suatu ekonomi hiperinflasi) yang hyperinflationary economy) that have a
memiliki mata uang fungsional yang functional currency different from the
berbeda dengan mata uang penyajian Company’s presentation currency are
Perusahaan, ditranslasikan dalam mata translated into the Company’s presentation
uang penyajian Perusahaan sebagai currency as follows:
berikut:

(a) Aset dan liabilitas yang disajikan pada (a) The assets and liabilities presented in
laporan posisi keuangan konsolidasian, the consolidated statement of financial
dijabarkan pada kurs penutup tanggal position are translated at the closing
laporan posisi keuangan konsolidasian rate at the date of the consolidated
tersebut; statement of financial position;

(b) Penghasilan dan beban untuk setiap (b) The income and expenses for each
laba rugi dijabarkan menggunakan item of profit or loss are translated at
kurs rata-rata (kecuali jika rata-rata the average exchange rates (unless
tersebut bukan perkiraan wajar efek this average is not a reasonable
kumulatif dari kurs yang berlaku pada approximation of the cumulative effect
tanggal transaksi, maka penghasilan of the rates prevailing on the
dan beban dijabarkan menggunakan transaction dates, in which case the
kurs tanggal transaksi); dan income and expenses are translated at
the rates in force on the dates of the
transactions); and

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022
Kurs rata-rata/ Kurs rata-rata/
Average rate*) Average rate*)

Dolar AS (USD) 15,065 15,233 US Dollars (USD)

*) dalam jumlah penuh *) in full amount

(c) Seluruh selisih kurs yang timbul diakui (c) All of the resulting exchange
dalam penghasilan komprehensif lain. differences are recognised in other
comprehensive income.

f. Transaksi-transaksi dengan pihak berelasi f. Transactions with related parties

Grup melakukan transaksi dengan pihak-pihak The Group has transactions with related parties
berelasi sesuai yang didefinisikan oleh PSAK as defined under SFAS No. 7: “Related Party
No. 7: “Pengungkapan Pihak-pihak Berelasi” Disclosures” and OJK Regulation No. VIII.G.7:
dan Peraturan OJK No. VIII.G.7:
(a) Orang atau anggota keluarga dekatnya (a) A person or a close member of that
mempunyai relasi dengan entitas pelapor person's family is related to a reporting
jika orang tersebut: entity if that person:
(i) Memiliki pengendalian atau (i) Has control or joint control over the
pengendalian bersama atas entitas reporting entity;
pelapor;
(ii) Memiliki pengaruh signifikan atas (ii) Has significant influence over the
entitas pelapor; atau reporting entity; or
(iii) Merupakan personil manajemen kunci (iii) Is a member of the key management
entitas pelapor atau entitas induk dari personnel of the reporting entity or of a
entitas pelapor. parent of the reporting entity.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/21 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

f. Transaksi-transaksi dengan pihak berelasi f. Transactions with related parties (continued)


(lanjutan)

(b) Suatu entitas berelasi dengan entitas (b) An entity is related to a reporting entity if
pelapor jika memenuhi salah satu hal any of the following conditions apply:
berikut:
(i) Entitas dan entitas pelapor adalah (i) The entity and the reporting entity are
anggota dari kelompok usaha yang members of the same group (which
sama (artinya entitas induk, entitas means that each parent, subsidiary
anak dan entitas anak berikutnya and fellow subsidiary is related to each
saling berelasi dengan entitas lain); other);
(ii) Satu entitas adalah entitas asosiasi (ii) One entity is an associate or joint
atau ventura bersama dari entitas lain venture of the other entity (or an
(atau entitas asosiasi atau ventura associate or joint venture of a member
bersama yang merupakan anggota of a group of which the other entity is a
suatu kelompok usaha, yang mana member);
entitas lain tersebut adalah
anggotanya);
(iii) Kedua entitas tersebut adalah ventura (iii) Both entities are joint ventures of the
bersama dari pihak ketiga yang sama; same third party;
(iv) Satu entitas adalah ventura bersama (iv) One entity is a joint venture of a third
dari entitas ketiga dan entitas yang lain entity and the other entity is an
adalah entitas asosiasi dari entitas associate of the third entity;
ketiga;
(v) Entitas tersebut adalah suatu program (v) The entity is a post-employment
imbalan pascakerja untuk imbalan benefit plan for the benefit of the
kerja dari salah satu entitas pelapor employees of either the reporting entity
atau entitas yang terkait dengan or an entity related to the reporting
entitas pelapor. Jika entitas pelapor entity. If the reporting entity is itself
adalah entitas yang menyelenggarakan such a plan, the sponsoring employers
program tersebut, maka entitas are also related to the reporting entity;
sponsor juga berelasi dengan entitas
pelapor;
(vi) Entitas yang dikendalikan atau (vi) The entity is controlled or jointly
dikendalikan bersama oleh orang yang controlled by a person identified in (a);
diidentifikasi dalam huruf (a);
(vii) Orang yang diidentifikasi dalam huruf (vii) A person identified in (a) (i) has
(a) (i) memiliki pengaruh signifikan significant influence over the entity or
atas entitas atau personil manajemen is a member of the key management
kunci entitas (atau entitas induk dari personnel of the entity (or of a parent
entitas). of the entity).

Entitas yang berelasi dengan Pemerintah A Government related entity is an entity that is
adalah entitas yang dikendalikan, dikendalikan controlled, jointly controlled or significantly
bersama, atau dipengaruhi oleh Pemerintah. influenced by a Government. Government
Pemerintah mengacu kepada Pemerintah, refers to Government, Government agencies
instansi Pemerintah dan badan yang serupa and similar bodies whether local, national or
baik lokal, nasional maupun internasional. international.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/22 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

f. Transaksi-transaksi dengan pihak berelasi f. Transactions with related parties (continued)


(lanjutan)

Entitas yang berelasi dengan Pemerintah Government related entities include entities
termasuk entitas yang dikendalikan atau which are controlled or significantly influenced
dipengaruhi secara signifikan oleh Kementerian by the Ministry of Finance or Local
Keuangan atau Pemerintah Daerah yang Governments being the shareholders of the
merupakan pemegang saham entitas, atau entity or an entity controlled by the Government
entitas yang dikendalikan oleh Pemerintah of the Republic of Indonesia, represented by the
Republik Indonesia melalui Kementerian BUMN Ministry of SOEs as the shareholder’s
sebagai kuasa pemegang saham. representative.

Seluruh transaksi dan saldo yang signifikan All significant transactions and balances with
dengan pihak berelasi diungkapkan dalam related parties are disclosed in the relevant
Catatan yang relevan. Notes.

g. Aset keuangan g. Financial assets

i. Klasifikasi, pengakuan dan pengukuran i. Classification, recognition and


measurement

Grup mengklasifikasikan aset keuangannya The Group classifies its financial assets in
dalam kategori pengukuran berikut: the following measurement categories:
• aset keuangan yang diukur pada nilai • financial assets measured at fair value
wajar melalui laba rugi atau melalui either through profit or loss (“FVTPL”)
penghasilan komprehensif lain; dan or through other comprehensive
income (“FVOCI”); and
• aset keuangan yang diukur pada biaya • those to be measured at amortised
perolehan diamortisasi. cost.

Klasifikasi tersebut tergantung pada model The classification depends on the Group’s
bisnis Grup dan persyaratan kontraktual business model and the contractual terms
arus kas - apakah penentuan arus kasnya of the cash flows of the cash flows when
semata dari pembayaran pokok dan bunga. determining whether their cash flows are
solely payments of principal and interest
(“SPPI”).

Untuk aset yang diukur pada nilai wajar, For assets measured at fair value, gains
keuntungan dan kerugian akan dicatat and losses will either be recorded in profit
dalam laporan laba rugi atau penghasilan or loss or other comprehensive income. For
komprehensif lain. Untuk investasi pada investments in debt instruments, this will
instrumen utang, hal ini akan bergantung depend on the business model in which the
pada model bisnis dimana investasi investment is held. For investments in
tersebut diadakan. Untuk investasi pada equity instruments that are not held for
instrumen ekuitas yang tidak dimiliki untuk trading, this will depend on whether the
diperdagangkan, hal ini akan tergantung Group has made an irrevocable election at
pada apakah Grup telah memilih tidak the time of initial recognition to account for
dapat dibatalkan pada saat pengakuan the equity investment at fair value through
awal untuk mencatat investasi ekuitas other comprehensive income.
pada nilai wajar melalui penghasilan
komprehensif lain.

Grup mereklasifikasi investasi utang jika The Group reclassifies debt investments
dan hanya jika model bisnis untuk when and only when its business model for
mengelola aset tersebut berubah. managing such assets changes.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/23 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

g. Aset keuangan (lanjutan) g. Financial assets (continued)

i. Klasifikasi, pengakuan dan pengukuran i. Classification, recognition and


(lanjutan) measurement (continued)

Pada pengakuan awal, Grup mengukur At initial recognition, the Group measures a
aset keuangan pada nilai wajarnya financial asset at its fair value plus, in the
ditambah, dalam hal aset keuangan tidak case of a financial asset not at fair value
diukur pada nilai wajar melalui laba rugi, through profit or loss, transaction costs that
biaya transaksi yang dapat diatribusikan are directly attributable to the acquisition of
secara langsung dengan perolehan aset the financial asset. Transaction costs of
keuangan. Biaya transaksi dari aset financial assets carried at fair value through
keuangan yang dicatat pada nilai wajar profit or loss are expensed in profit or loss.
melalui laba rugi dibebankan pada laba
rugi.

Aset keuangan dengan derivatif melekat Financial assets with embedded derivatives
dipertimbangkan secara keseluruhan saat are considered in their entirety when
menentukan apakah arus kasnya hanya determining whether their cash flows are
merupakan pembayaran pokok dan bunga. SPPI.

Instrumen utang Debt instruments

Pengukuran selanjutnya instrumen utang Subsequent measurement of debt


bergantung pada model bisnis Grup dalam instruments depends on the Group’s
mengelola aset dan karakteristik arus kas business model for managing the asset and
dari aset tersebut. Ada tiga kategori the cash flow characteristics of the asset.
pengukuran yang Grup mengklasifikasikan There are three measurement categories
instrumen utangnya: into which the Group classifies its debt
instruments:

- Biaya perolehan diamortisasi: Aset - Amortised cost: Assets that are held
yang dimiliki untuk mengumpulkan for the collection of contractual cash
arus kas kontraktual dimana arus kas flows in cases where such cash flows
tersebut hanya mewakili pembayaran represent SPPI are measured at
pokok dan bunga diukur dengan biaya amortised cost. A gain or loss on a
perolehan diamortisasi. Keuntungan debt investment that is subsequently
atau kerugian dari investasi utang measured at amortised cost and that is
yang selanjutnya diukur pada biaya not part of a hedging relationship is
perolehan diamortisasi dan bukan recognised in profit or loss when the
merupakan bagian dari hubungan asset is derecognised or impaired.
lindung nilai, diakui dalam laba rugi Interest income from these financial
pada saat aset tersebut dihentikan assets is included in finance income
pengakuannya atau penurunan using the effective interest rate
nilainya. Pendapatan bunga dari aset method.
keuangan tersebut dimasukkan ke
dalam pendapatan keuangan dengan
menggunakan metode suku bunga
efektif.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/24 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

g. Aset keuangan (lanjutan) g. Financial assets (continued)

i. Klasifikasi, pengakuan dan pengukuran i. Classification, recognition and


(lanjutan) measurement (continued)

Instrumen utang (lanjutan) Debt instruments (continued)

- Nilai wajar melalui penghasilan - Fair value through other


komprehensif lain: Aset yang dimiliki comprehensive income (“FVOCI”):
untuk mendapatkan arus kas Assets that are held for the collection
kontraktual dan untuk menjual aset of contractual cash flows and for
keuangan, di mana arus kas aset selling the financial assets, in cases
tersebut hanya atas pembayaran where the assets’ cash flows represent
pokok dan bunga, diukur pada nilai SPPI, are measured at FVOCI.
wajar melalui penghasilan Movements in the carrying amount are
komprehensif lain. Perubahan nilai taken through other comprehensive
tercatat dilakukan melalui penghasilan income, except for the recognition of
komprehensif lain, kecuali untuk impairment gains or losses, interest
pengakuan keuntungan atau kerugian revenue and foreign exchange gains
penurunan nilai, pendapatan bunga and losses which are recognised in
dan keuntungan dan kerugian selisih profit or loss. When the financial asset
kurs yang diakui dalam laba rugi. is derecognised, the cumulative gain or
Ketika aset keuangan dihentikan loss previously recognised in OCI is
pengakuannya, keuntungan atau reclassified from equity to profit or loss
kerugian kumulatif yang sebelumnya and recognised in other income and
diakui di penghasilan komprehensif expenses. Interest income from these
lain direklasifikasi dari ekuitas ke laba financial assets is included in finance
rugi dan diakui dalam penghasilan income using the effective interest rate
atau beban lain-lain. Pendapatan method. Foreign exchange gains and
bunga dari aset keuangan tersebut losses are presented in other gains
dimasukkan ke dalam pendapatan and losses on foreign exchanges, net
keuangan dengan menggunakan and impairment expenses in other
metode suku bunga efektif. expenses.
Keuntungan dan kerugian selisih kurs
disajikan dalam penghasilan dan
beban kurs mata uang asing dan
beban penurunan nilai pada beban
lain-lain.

- Nilai wajar melalui laba rugi: Aset yang - Fair value through profit or loss: Assets
tidak memenuhi kriteria untuk biaya that do not meet the criteria for
perolehan diamortisasi atau nilai wajar amortised cost or FVOCI are
melalui penghasilan komprehensif lain measured at fair value through profit or
diukur pada nilai wajar melalui laporan loss. A gain or loss on a debt
laba rugi. Keuntungan atau kerugian investment that is subsequently
dari investasi utang yang selanjutnya measured at fair value through profit or
diukur pada nilai wajar melalui laporan loss and that is not part of a hedging
laba rugi dan bukan merupakan bagian relationship, is recognised in profit or
dari hubungan lindung nilai, diakui loss and presented net in profit or loss.
dalam laba rugi dan disajikan bersih
dalam laba rugi.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/25 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

g. Aset keuangan (lanjutan) g. Financial assets (continued)

i. Klasifikasi, pengakuan, dan pengukuran i. Classification, recognition and


(lanjutan) measurement (continued)

Instrumen ekuitas Equity instruments

Grup selanjutnya mengukur semua The Group subsequently measures all


investasi ekuitas pada nilai wajar. Jika equity investments at fair value. In cases
manajemen Grup telah memilih untuk where the Group’s management has
menyajikan keuntungan dan kerugian nilai elected to present fair value gains and
wajar atas investasi ekuitas dalam losses on equity investments in other
penghasilan komprehensif lain, tidak ada comprehensive income, there is no
reklasifikasi keuntungan dan kerugian nilai subsequent reclassification of fair value
wajar ke laba rugi setelah penghentian gains and losses to profit or loss following
pengakuan investasi tersebut. Dividen dari the derecognition of the investment.
investasi semacam itu tetap diakui dalam Dividends from such investments continue
laba rugi sebagai pendapatan lainnya to be recognised in profit or loss as other
ketika hak Grup untuk menerima income when the Group’s right to receive
pembayaran ditetapkan. payments is established.

Perubahan nilai wajar aset keuangan yang Changes in the fair value of financial assets
diukur pada nilai wajar melalui laporan laba at fair value through profit or loss are
rugi diakui dalam keuntungan/(kerugian) recognised in other gains/(losses) in the
lain-lain dalam laporan laba rugi consolidated statement of profit or loss as
konsolidasian sebagaimana berlaku. applicable. Impairment losses (and the
Kerugian penurunan nilai (dan pemulihan reversal of impairment losses) on equity
kerugian penurunan nilai) atas investasi investments measured at FVOCI are not
ekuitas yang diukur pada nilai wajar melalui reported separately from other changes in
penghasilan komprehensif lain tidak fair value.
dilaporkan secara terpisah dari perubahan
nilai wajar lainnya.

ii. Penghentian pengakuan ii. Derecognition

Aset keuangan dihentikan pengakuannya Financial assets are derecognised when


ketika hak untuk menerima arus kas dari the rights to receive cash flows from the
investasi tersebut telah jatuh tempo atau investments have expired or have been
telah ditransfer dan Grup telah mentransfer transferred and the Group has transferred
secara substansial seluruh risiko dan substantially all the risks and rewards of
manfaat atas kepemilikan aset. ownership.

iii. Saling hapus antar instrumen keuangan iii. Offsetting financial instruments

Aset keuangan dan liabilitas keuangan Financial assets and liabilities are offset
disalinghapuskan dan jumlah netonya and the net amount is reported in the
dilaporkan pada laporan posisi keuangan consolidated statement of financial position
konsolidasian ketika terdapat hak yang when there is a legally enforceable right to
berkekuatan hukum untuk melakukan offset the recognised amounts and there is
saling hapus atas jumlah yang telah diakui an intention to settle on a net basis, or
tersebut dan adanya niat untuk realise the asset and settle the liability
menyelesaikan secara neto, atau untuk simultaneously.
merealisasikan aset dan menyelesaikan
liabilitas secara bersamaan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/26 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)
h. Penurunan nilai aset keuangan h. Impairment of financial assets
Pada setiap tahun pelaporan, Grup menilai At each reporting date, the Group assesses
apakah risiko kredit dari instrumen keuangan whether the credit risk on a financial instrument
telah meningkat secara signifikan sejak has increased significantly since initial
pengakuan awal. Ketika melakukan penilaian, recognition. When making the assessment, the
Grup menggunakan perubahan atas risiko Group uses the change in the risk of a default
gagal bayar yang terjadi sepanjang perkiraan occurring over the expected life of the financial
usia instrumen keuangan daripada perubahan instrument instead of the change in the amount
atas jumlah kerugian kredit ekspektasian. of expected credit losses. To make that
Dalam melakukan penilaian, Grup assessment, the Group compares the risk of a
membandingkan antara risiko gagal bayar yang default occurring on the financial instrument as
terjadi atas instrumen keuangan pada saat at the reporting date with the risk of a default
tahun pelaporan dengan risiko gagal bayar occurring on the financial instrument as at the
yang terjadi atas instrumen keuangan pada saat date of initial recognition and considers
pengakuan awal dan mempertimbangkan reasonable and supportable information, which
kewajaran serta ketersediaan informasi yang is available without undue cost or effort at the
tersedia pada saat tanggal pelaporan terkait reporting date about past events, current
dengan kejadian masa lalu, kondisi terkini dan conditions and forecasts of future economic
perkiraan atas kondisi ekonomi di masa depan, conditions, that is indicative of significant
yang mengindikasikan kenaikan risiko kredit increases in credit risk since initial recognition.
sejak pengakuan awal.
Grup menerapkan “pendekatan yang The Group applies the “simplified approach” to
disederhanakan” untuk mengukur kerugian measuring expected credit losses which uses a
kredit ekspektasian yang menggunakan lifetime expected credit loss allowance for all
cadangan kerugian kredit ekspektasian seumur trade receivables, other receivables and
hidup untuk seluruh saldo piutang usaha, dan contract assets without significant financing
piutang lain-lain, dan aset kontrak tanpa components and the “general approach” for
komponen pendanaan yang signifikan, dan other financial assets. The general approach
“pendekatan umum” untuk aset keuangan incorporates a review for any significant
lainnya. Pendekatan umum termasuk increase in counterparty credit risk since initial
penelaahan perubahan signifikan risiko kredit recognition. The expected credit loss reviews
sejak pengakuan awal. Penelaahan kerugian include assumptions about the risk of default
kredit ekspektasian termasuk asumsi mengenai and expected loss rates. To measure the
risiko gagal bayar dan tingkat kerugian expected credit losses, trade receivables have
ekspektasian. Untuk mengukur kerugian kredit been grouped based on similar credit risk
ekspektasian, piutang usaha telah characteristics and the days past due, with the
dikelompokkan berdasarkan karakteristik risiko exception of the receivables which can be
kredit dan jatuh tempo yang serupa, terkecuali assessed at their own rating of expected credit
kepada piutang-piutang yang dapat dinilai losses.
sendiri kerugian kredit ekspektasiannya.
i. Aset tetap i. Property, plant and equipment
Pada tanggal akuisisi, Grup menganalisis fakta At acquisition date, the Group analyses the
dan keadaan untuk masing-masing jenis tanah facts and circumstances for each type of land
dan hak atas tanah dalam menentukan and land rights in determining the accounting for
akuntansi untuk masing-masing tanah dan hak each of these land and land rights so that it can
atas tanah tersebut sehingga dapat accurately represent an underlying economic
merepresentasikan dengan tepat suatu kejadian event or transaction. If the land and land rights
atau transaksi ekonomis yang mendasarinya. do not transfer control of the underlying assets
Jika tanah dan hak atas tanah tersebut tidak to the Group, but give the rights to use the
mengalihkan pengendalian atas aset pendasar underlying assets, the Group accounts for these
kepada Grup, melainkan mengalihkan hak transactions as leases under SFAS No. 73,
untuk menggunakan aset pendasar, Grup “Leases”. If the land and land rights are
menerapkan perlakuan akuntansi atas transaksi substantially similar to land purchases, the
tersebut sebagai sewa berdasarkan PSAK No. Group applies SFAS No. 16, “Fixed Assets”
73, “Sewa”. Jika tanah dan hak atas tanah under which land and land rights are recognised
secara substansi menyerupai pembelian tanah, at cost and not depreciated.
maka Grup menerapkan PSAK No. 16, “Aset
Tetap” yaitu tanah dan hak atas tanah diakui
sebesar harga perolehan dan tidak disusutkan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/27 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

i. Aset tetap (lanjutan) i. Property, plant and equipment (continued)

Aset tetap pada awalnya diakui sebesar biaya Property, plant and equipment are initially
perolehan yang meliputi harga perolehannya dan recognised at cost, which comprises the
setiap biaya yang dapat diatribusikan langsung purchase price and any cost directly attributable
untuk membawa aset ke kondisi dan lokasi yang to bringing the asset to the location and
diinginkan agar aset siap digunakan sesuai condition necessary for it to be capable of
intensi manajemen. operating in the manner intended by
management.

Apabila relevan, biaya perolehan juga dapat When applicable, the cost may also comprise
mencakup estimasi awal biaya pembongkaran the initial estimate of the costs of dismantling
dan pemindahan aset tetap dan restorasi lokasi and removing the item and restoring the site on
aset tetap, kewajiban tersebut timbul ketika aset which it is located, the obligation for which an
tetap diperoleh atau sebagai konsekuensi entity incurs either when the item is acquired or
penggunaan aset tetap selama tahun tertentu as a consequence of having used the item
untuk tujuan selain untuk memproduksi during a particular year for purposes other than
persediaan selama tahun tersebut. to produce inventories during that year.

Setelah pengakuan awal, kelas-kelas aset After initial recognition, the following classes of
berikut ini yang diukur menggunakan metode assets are measured using the revaluation
revaluasi: method:
• Tanah dan hak atas tanah; • Land and land rights;
• Bangunan umum, waduk, dan prasarana; • Buildings, reservoirs and infrastructure;
• Instalasi dan mesin pembangkit; • Installations and power plants;
• Perlengkapan transmisi; • Transmission equipment;
• Perlengkapan distribusi; • Distribution equipment;
• Perlengkapan pengolahan data dan • Telecommunications and data processing
telekomunikasi yang digunakan dalam equipment used for electricity supply; and
penyediaan listrik; dan
• Material cadangan utama. • Major spare parts.

Kelas aset di atas, disajikan sebesar nilai wajar The classes of asset above are shown at fair
dikurangi penyusutan dan penurunan nilai. value less subsequent depreciation and
Tanah tidak disusutkan. Tanah dan hak atas impairment losses. Land and land rights are not
tanah tidak didepresiasi. Penilaian terhadap depreciated. Valuation of those assets is
aset-aset tersebut dilakukan oleh penilai performed by external independent valuers
independen eksternal yang terdaftar di OJK. which are registered with the FSA. Valuations
Penilaian atas aset tersebut dilakukan secara are performed with sufficient regularity to
berkala untuk memastikan bahwa nilai wajar ensure that the fair value of a revalued asset
aset yang direvaluasi tidak berbeda secara does not differ materially from its carrying
material dengan nilai tercatatnya. Aset yang amount. Assets that do not change significantly
tidak mengalami perubahan nilai wajar secara in fair value must be re-evaluated at least every
signifikan wajib direvaluasi paling kurang setiap 3 (three) years. Any accumulated depreciation
3 (tiga) tahun. Akumulasi penyusutan pada at the date of revaluation is eliminated against
tanggal revaluasi dieliminasi terhadap nilai the gross carrying amount of the asset and the
tercatat bruto aset, dan nilai netonya disajikan net amount is restated to the revalued amount
kembali sebesar nilai revaluasi aset tetap. of the property, plant and equipment.

Kenaikan nilai tercatat yang timbul dari Increases in the carrying amount arising on
revaluasi aset tetap yang menggunakan model revaluation of property, plant and equipment
revaluasi dikreditkan pada “surplus revaluasi that use a revaluation model are credited to
aset” sebagai bagian dari penghasilan “asset revaluation surplus” as part of other
komprehensif lain. Penurunan yang menghapus comprehensive income. Decreases that offset
nilai kenaikan sebelumnya atas aset yang sama previous increases of the same asset are
dibebankan terhadap “surplus revaluasi aset” debited against “asset revaluation surplus” as
sebagai bagian dari penghasilan komprehensif part of other comprehensive income including
lain termasuk aset tersebut ditransfer ke aset the assets that are transferred to assets not
tidak digunakan dalam operasi; penurunan used in operations; all other decreases are
lainnya dibebankan pada laba rugi. charged to profit or loss.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/28 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

i. Aset tetap (lanjutan) i. Property, plant and equipment (continued)

Aset tetap disusutkan hingga mencapai Property, plant and equipment are depreciated
estimasi nilai sisa dengan menggunakan to their residual values using the straight-line
metode garis lurus selama masa manfaatnya method over their expected useful lives as
sebagai berikut: follows:

Tahun/Years

Bangunan umum, waduk, dan prasarana 10 - 50 Buildings, reservoirs, and infrastructure


Instalasi dan mesin pembangkit 12 - 40 Installations and power plants
Perlengkapan transmisi 40 Transmission equipment
Perlengkapan distribusi 10 - 40 Distribution equipment
Perlengkapan umum 5 General equipment
Kendaraan bermotor 5 Motor vehicles
Material cadangan utama 10 - 40 Major spare parts
Perlengkapan pengolahan data dan Telecommunications and
telekomunikasi yang digunakan data processing equipmentAA
dalam penyediaan listrik 10 used for electricity supplyAA
Perlengkapan pengolahan data dan Other telecommunications and data
telekomunikasi lainnya 10 processing equipmentAA
Kapal dan perlengkapan 10 - 25 Vessels and equipment

Masa manfaat ekonomis, nilai sisa, dan metode The useful lives, residual values and
penyusutan aset tetap ditelaah, jika diperlukan, depreciation methods of property, plant and
setidaknya disesuaikan, pada setiap akhir tahun equipment are reviewed and adjusted if
buku. Dampak dari setiap revisi diakui dalam laba appropriate, at the end of each financial year.
rugi, ketika perubahan terjadi. The effects of any revisions are recognised in
profit or loss, when the changes arise.

Nilai tercatat aset segera diturunkan sebesar An asset’s carrying amount is written down
jumlah yang dapat dipulihkan apabila nilai immediately to its recoverable amount if the
tercatat aset lebih besar daripada estimasi asset’s carrying amount is greater than its
jumlah yang dapat dipulihkan (Catatan 3.j). estimated recoverable amount (Note 3.j).

Beban perbaikan dan pemeliharaan dibebankan The costs of repairs and maintenance are
pada laba rugi pada saat terjadinya. Biaya- charged to profit or loss as incurred.
biaya lain yang terjadi selanjutnya yang timbul Subsequent costs incurred to add to, replace
untuk menambah, mengganti atau memperbaiki part of, or service an item of property, plant and
aset tetap diakui sebagai biaya perolehan aset equipment, are recognised as assets if and only
jika dan hanya jika besar kemungkinan manfaat if it is probable that future economic benefits
ekonomis di masa depan berkenaan dengan associated with the item will flow to the entity
aset tersebut akan mengalir ke entitas dan and the cost of the item can be measured
biaya perolehan aset dapat diukur secara andal. reliably.

Aset tetap yang tidak digunakan lagi atau dijual, For property, plant and equipment which can no
nilai tercatatnya dikeluarkan dari kelompok aset longer be utilised or sold, the carrying amount is
tetap. Keuntungan atau kerugian dari penjualan eliminated from the group of property, plant and
aset tetap tersebut diakui dalam laba rugi. equipment. The resulting gains or losses on
disposals of property, plant and equipment are
recognised in profit or loss.

Jika aset yang direvaluasi tidak digunakan lagi When revalued assets are no longer utilised or
atau dijual, jumlah yang dicatat di dalam ekuitas sold, the amounts included in equity are
dipindahkan ke saldo laba. transferred to retained earnings.

Aset tidak digunakan dalam operasi terdiri dari Assets not used in operations consist of
aset tetap yang akan direlokasi/ditransfer dan property, plant and equipment that will be
sedang diperbaiki. Aset yang tidak digunakan relocated/transferred and will be repaired.
dalam operasi disusutkan dengan metode garis Assets not used in operations are depreciated
lurus dan berdasarkan taksiran masa manfaat using the same method and based on the
ekonomis yang sama dengan aset tetap. economic useful lives of the property, plant and
equipment.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/29 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

i. Aset tetap (lanjutan) i. Property, plant and equipment (continued)

Aset dalam pembangunan merupakan biaya- Construction in progress represents costs


biaya yang berhubungan langsung dengan directly attributable to the construction of
pembangunan aset tetap. Aset dalam property, plant and equipment. Construction in
pembangunan dinyatakan sebesar biaya progress is stated at cost, which includes
perolehan, termasuk biaya pinjaman selama borrowing costs during construction on debts
masa pembangunan dari pinjaman yang incurred to finance the construction,
digunakan untuk pembangunan, beban depreciation of property, plant and equipment
penyusutan aset tetap yang digunakan dalam used in the construction and cost of testing
pekerjaan pembangunan dan biaya pengujian whether the asset is functioning properly after
ketika aset dapat berfungsi setelah dikurangi deducting sales of electricity during the
penjualan listrik ketika masa uji coba. Aset commissioning period. Construction in progress
dalam pembangunan akan dipindahkan ke is transferred to the respective property, plant
masing-masing aset tetap yang bersangkutan and equipment account when completed and
pada saat selesai dan siap digunakan. ready for use. Depreciation is charged from the
Penyusutan dimulai pada saat aset tersebut date on which the assets are ready for use in
siap untuk digunakan sesuai dengan tujuan the manner intended by management.
yang diinginkan manajemen.

j. Penurunan nilai aset non-keuangan j. Impairment of non-financial assets

Aset yang memiliki masa manfaat yang tidak Assets that have an indefinite useful life - for
terbatas, misalnya goodwill, tidak diamortisasi example, goodwill - are not subject to
namun diuji penurunan nilainya setiap tahun amortisation but are tested annually for
atau lebih sering apabila terdapat peristiwa atau impairment, or more frequently if events or
perubahan pada kondisi yang mengindikasikan changes in circumstances indicate that they
kemungkinan penurunan nilai. Aset yang might be impaired. Assets that are subject to
diamortisasi diuji ketika terdapat indikasi bahwa amortisation are reviewed for impairment
nilai tercatatnya mungkin tidak dapat dipulihkan. whenever events or changes in circumstances
Penurunan nilai diakui jika nilai tercatat aset indicate that the carrying amount may not be
melebihi jumlah terpulihkan. Jumlah terpulihkan recoverable. An impairment loss is recognised
adalah yang lebih tinggi antara nilai wajar aset for the amount by which the asset’s carrying
dikurangi biaya pelepasan dan nilai pakai aset. amount exceeds its recoverable amount. The
Dalam menentukan penurunan nilai, aset recoverable amount is the higher of an asset’s
dikelompokkan pada tingkat yang paling rendah fair value less costs of disposal and value-in-
dimana terdapat arus kas yang dapat use. For the purposes of assessing impairment,
diidentifikasi. Aset non-keuangan selain assets are grouped at the lowest levels for
goodwill yang mengalami penurunan nilai diuji which there are separately identifiable cash
setiap tanggal pelaporan untuk menentukan flows. Non-financial assets other than goodwill
apakah terdapat kemungkinan pemulihan that suffer impairment are reviewed for a
penurunan nilai. possible reversal of the impairment at each
reporting date.

Pembalikan rugi penurunan nilai untuk aset Reversal of impairment losses for assets other
selain goodwill, diakui jika dan hanya jika, than goodwill would be recognised, if and only
terdapat perubahan estimasi yang digunakan if, there has been a change in the estimates
dalam menentukan jumlah terpulihkan aset used to determine the asset’s recoverable
sejak pengujian penurunan nilai terakhir kali amount since the last impairment testing was
dilakukan. Pembalikan rugi penurunan nilai carried out. Reversal of impairment losses will
tersebut diakui langsung dalam laba rugi. Rugi be immediately recognised in profit or loss.
penurunan nilai yang diakui atas goodwill tidak Impairment losses relating to goodwill would not
dibalik lagi. be reversed.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/30 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

k. Utang usaha k. Trade payables

Utang usaha adalah kewajiban untuk Trade payables are obligations to pay for goods
membayar barang atau jasa yang telah diterima or services that have been acquired in the
dalam kegiatan usaha normal dari pemasok. ordinary course of business from suppliers.
utang usaha diklasifikasikan sebagai liabilitas Trade payables are classified as current
jangka pendek apabila pembayarannya jatuh liabilities if payment is due within one year of
tempo dalam waktu satu tahun atau kurang the reporting date. If not, they are presented as
setelah tanggal pelaporan. jika tidak, utang non-current liabilities.
usaha tersebut disajikan sebagai liabilitas
jangka panjang.

Utang usaha pada awalnya diakui sebesar nilai Trade payables are recognised initially at fair
wajar dan selanjutnya diukur pada biaya value and subsequently measured at amortised
perolehan diamortisasi dengan menggunakan cost using the effective interest method.
metode suku bunga efektif.

l. Sewa l. Leases

Grup sebagai pesewa The Group as a lessor

Ketika Grup bertindak sebagai pesewa, Grup When the Group acts as a lessor, it will classify
akan mengklasifikasi masing-masing sewanya each of its leases as either an operating lease
baik sewa operasi atau sewa pembiayaan. or a finance lease.

Untuk mengklasifikasi masing-masing sewa, To classify each lease, the Group makes an
Grup membuat penilaian secara keseluruhan overall assessment of whether the lease
atas apakah sewa mengalihkan secara transfers substantially all of the risks and
substansial seluruh risiko dan manfaat yang rewards incidental to ownership of the
terkait dengan kepemilikan aset pendasar. Jika underlying asset. If this is the case, then the
penilaian membuktikan hal tersebut, maka sewa lease is classified as a finance lease; if not, then
diklasifikasikan sebagai sewa pembiayaan; jika it is an operating lease.
tidak, maka merupakan sewa operasi.

Pendapatan sewa dari operasi sewa dimana Lease income from operating leases where the
Grup bertindak sebagai pesewa diakui sebagai Group is a lessor is recognised as revenue on a
pendapatan secara garis lurus selama masa straight-line basis over the lease term. Initial
sewa. Biaya langsung awal yang terjadi saat direct costs incurred in obtaining an operating
mendapatkan sewa operasi ditambahkan pada lease are added to the carrying amount of the
nilai tercatat aset pendasar dan diakui sebagai underlying asset and recognised as expense
beban selama masa sewa dengan basis yang over the lease term on the same basis as lease
sama dengan pendapatan sewa. Aset terkait income. The respective leased assets are
yang disewakan ditampilkan di laporan posisi included in the statement of financial position
keuangan berdasarkan sifatnya. based on their nature.

Grup sebagai penyewa The Group as a lessee

Penentuan apakah suatu perjanjian merupakan, Determination of whether an arrangement is, or


atau mengandung, sewa dibuat berdasarkan contains, a lease is made based on the
substansi perjanjian itu sendiri dan penilaian substance of the arrangement and assessment
apakah pemenuhan atas perjanjian bergantung of whether fulfilment of the arrangement is
dari penggunaan aset tertentu atau aset, dan dependent on the use of a specific asset or
apakah perjanjian memberikan hak untuk assets, and the arrangement conveys a right to
menggunakan aset. use the asset.

Grup menyewa aset tetap tertentu. Kontrak The Group leases certain property, plant and
sewa biasanya dibuat untuk periode tetap dari 2 equipment. Rental contracts are typically made
hingga 20 tahun tetapi mungkin memiliki opsi for fixed periods of 2 to 20 years but may have
ekstensi. Kontrak dapat berisi komponen sewa extension options. Contracts may contain both
dan non-sewa berdasarkan harga relatif yang lease and non-lease components based on their
berdiri sendiri. relative stand-alone prices.

Sewa diakui sebagai aset hak guna dan Leases are recognised as a right-of-use asset
liabilitas terkait pada tanggal di mana aset and a corresponding liability at the date on
sewaan tersedia untuk digunakan oleh Grup. which the leased asset is available for use by
the Group.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/31 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

l. Sewa (lanjutan) l. Leases (continued)

Grup sebagai penyewa (lanjutan) The Group as a lessee (continued)

Aset dan liabilitas yang timbul dari sewa pada Assets and liabilities arising from a lease are
awalnya diukur dengan basis nilai kini. Liabilitas initially measured on a present value basis.
sewa termasuk nilai bersih sekarang dari Lease liabilities include the net present value of
pembayaran sewa berikut: the following lease payments:
- pembayaran tetap (termasuk pembayaran - fixed payments (including in-substance
tetap secara substansi), dikurangi piutang fixed payments), less any lease incentives
insentif sewa; receivables;
- pembayaran sewa variabel yang - variable lease payments that are based on
didasarkan pada indeks atau tingkat, pada an index or a rate, initially measured using
awalnya diukur menggunakan indeks atau the index or rate as at the commencement
tingkat pada tanggal mulai; date;
- jumlah yang diperkirakan akan dibayarkan - amounts expected to be payable by the
oleh penyewa berdasarkan jaminan nilai lessee under residual value guarantees;
residu;
- harga pelaksanaan dari opsi pembelian jika - the exercise price of a purchase option if
penyewa cukup yakin untuk menggunakan the lessee is reasonably certain to exercise
opsi tersebut; dan that option; and
- pembayaran penalti untuk penghentian - payments of penalties for terminating the -
sewa, jika masa sewa mencerminkan lease, if the lease term reflects the lessee
penyewa yang melaksanakan opsi exercising that option.
tersebut.

Pembayaran sewa yang harus dilakukan Lease payments to be made under reasonably
berdasarkan opsi perpanjangan tertentu juga certain extension options are also included in
termasuk dalam pengukuran liabilitas. the measurement of the liability.

Pembayaran sewa didiskontokan dengan The lease payments are discounted using the
menggunakan suku bunga implisit dalam sewa. interest rate implicit in the lease. If the rate
Jika tarif tidak dapat segera ditentukan, di mana cannot be readily determined, which is generally
hal tersebut secara umum terjadi pada sewa the case for leases in the Group, the lessee’s
dalam Grup, suku bunga pinjaman inkremental incremental borrowing rate is used, being the
penyewa digunakan, yaitu tarif yang harus rate that the individual lessee would have to pay
dibayar oleh penyewa untuk meminjam dana to borrow the funds necessary to obtain an
yang diperlukan untuk memperoleh aset asset of similar value to the right-of-use asset in
dengan nilai yang sama dengan aset hak guna a similar economic environment with similar
dalam lingkungan ekonomi serupa dengan terms, security and conditions.
syarat dan ketentuan yang serupa.

Untuk menentukan suku bunga pinjaman To determine the incremental borrowing rate,
inkremental, Grup: the Group:
- jika memungkinkan, menggunakan - where possible, uses recent third-party
pembiayaan pihak ketiga terkini yang financing received by the individual lessee
diterima oleh penyewa individu sebagai titik as a starting point, adjusted to reflect
awal, disesuaikan untuk mencerminkan changes in financing conditions since third
perubahan kondisi pembiayaan sejak party financing was received;
pembiayaan pihak ketiga diterima;
- menggunakan pendekatan build-up yang - uses a build-up approach that starts with a
dimulai dengan suku bunga bebas risiko risk free interest rate adjusted for credit risk
yang disesuaikan dengan risiko kredit for leases held by the Group, where there
untuk sewa yang dimiliki oleh Grup, yang is no recent third-party financing; and
tidak memiliki pembiayaan pihak ketiga
baru-baru ini; dan
- membuat penyesuaian spesifik untuk sewa, - makes adjustments specific to the lease,
misalnya jangka waktu, mata uang, dan e.g., term, currency and security.
jaminan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/32 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

l. Sewa (lanjutan) l. Leases (continued)

Grup sebagai penyewa (lanjutan) The Group as a lessee (continued)

Grup dihadapkan pada potensi kenaikan di The Group is exposed to potential future
masa depan dalam pembayaran sewa variabel increases in variable lease payments based on
berdasarkan indeks atau tarif, yang tidak an index or rate, which are not included in the
termasuk dalam liabilitas sewa sampai lease liability until they take effect. When
diberlakukan. Ketika penyesuaian pembayaran adjustments to lease payments based on an
sewa berdasarkan indeks atau suku bunga index or rate take effect, the lease liability is
mulai berlaku, liabilitas sewa dinilai kembali dan reassessed and adjusted against the right-of-
disesuaikan dengan aset hak guna. use asset.

Pembayaran sewa dialokasikan antara biaya Lease payments are allocated between
pokok dan keuangan. Biaya keuangan principal and finance cost. The finance cost is
dibebankan pada laporan laba rugi selama charged to profit or loss over the lease period
masa sewa sehingga menghasilkan suku bunga so as to produce a constant periodic rate of
periodik yang konstan atas sisa saldo liabilitas interest on the remaining balance of the liability
untuk setiap periode. for each period.

Aset hak guna diukur pada biaya perolehan Right-of-use assets are measured at cost
yang terdiri dari berikut ini: comprising the following:
- jumlah pengukuran awal liabilitas sewa; - the amount of the initial measurement of
lease liability;
- pembayaran sewa yang dilakukan pada - any lease payments made at or before the
atau sebelum tanggal dimulainya dikurangi commencement date less any lease
insentif sewa yang diterima; dan incentives received; and
- biaya langsung awal, dan biaya restorasi. - any initial direct costs, and restoration
costs.

Aset hak guna umumnya disusutkan sepanjang Right-of-use assets are generally depreciated
waktu yang lebih pendek antara lama masa over the shorter of the asset’s useful life and the
manfaat aset dan jangka waktu sewa lease term on a straight-line basis. If the Group
menggunakan metode garis lurus. Jika Grup is reasonably certain to exercise a purchase
cukup yakin untuk melaksanakan opsi option, the right-of-use assets are depreciated
pembelian, aset hak guna disusutkan selama over the underlying assets’ useful life.
masa manfaat aset yang mendasarinya.

Aset hak guna juga mengalami penurunan nilai The right-of-use assets are also subject to
(Catatan 3.j). impairment (Note 3.j).

Pembayaran terkait dengan sewa jangka Payments associated with short-term leases
pendek dan sewa aset bernilai rendah diakui and leases of low-value assets are recognised
atas dasar garis lurus sebagai beban dalam on a straight-line basis as an expense in profit
laporan laba rugi. Sewa jangka pendek adalah or loss. Short-term leases are leases with a
sewa dengan masa sewa 12 bulan atau kurang. lease term of 12 months or less. Low-value
Aset bernilai rendah terdiri dari peralatan assets comprise general equipment.
umum.

Opsi ekstensi dan terminasi Extension and termination options

Opsi ekstensi dan terminasi termasuk dalam Extension and termination options are included
sejumlah sewa properti dan peralatan di seluruh in a number of property and equipment leases
Grup. Istilah-istilah ini digunakan untuk across the Group. These terms are used to
memaksimalkan fleksibilitas operasional dalam maximise operational flexibility in terms of
hal pengelolaan kontrak. Mayoritas opsi managing contracts. The majority of extension
ekstensi dan terminasi yang dimiliki hanya and termination options held are exercisable
dapat dilaksanakan oleh Grup dan bukan oleh only by the Group and not by the respective
pemberi sewa masing-masing. lessor.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/33 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

l. Sewa (lanjutan) l. Leases (continued)

Grup sebagai penyewa (lanjutan) The Group as a lessee (continued)

Jaminan nilai residu Residual value guarantees

Untuk mengoptimalkan biaya sewa selama To optimise lease costs during the contract
periode kontrak, Grup terkadang memberikan period, the Group sometimes provides residual
jaminan nilai residu sehubungan dengan sewa value guarantees in relation to equipment
peralatan. leases.

Modifikasi sewa Lease modification

Penyewa mencatat modifikasi sewa sebagai A lessee shall account for a lease modification
sewa terpisah jika: as a separate lease if both:

- modifikasi meningkatkan ruang lingkup - the modification increases the scope of


sewa dengan menambahkan hak untuk the lease by adding the right to use one or
menggunakan satu aset pendasar atau more underlying assets; and
lebih; dan
- imbalan sewa meningkat sebesar jumlah - the consideration for the lease increases
yang setara dengan harga tersendiri untuk by an amount commensurate with the
peningkatan dalam ruang lingkup dan stand-alone price for the increase in scope
penyesuaian yang tepat pada harga and any appropriate adjustments to that
tersendiri tersebut untuk merefleksikan stand-alone price to reflect the
kondisi kontrak tertentu. circumstances of the particular contract.

Untuk modifikasi sewa yang tidak dicatat For a lease modification that is not accounted
sebagai sewa terpisah, pada tanggal efektif for as a separate lease, at the effective date of
modifikasi sewa, penyewa: the lease modification, a lessee shall:

- mengalokasikan imbalan kontrak - allocate the consideration in the modified


modifikasian; contract;
- menentukan masa sewa dari sewa - determine the lease term of the modified
modifikasian; dan lease; and
- mengukur kembali liabilitas sewa dengan - remeasure the lease liability by
mendiskontokan pembayaran sewa revision discounting the revised lease payments
menggunakan tingkat diskonto revisian. using a revised discount rate. The revised
Tingkat diskonto revisian ditentukan discount rate is determined as the interest
sebagai suku bunga implisit dalam sewa rate implicit in the lease for the remainder
untuk sisa masa sewa, jika dapat of the lease term, if that rate can be
ditentukan; atau suku bunga pinjaman readily determined, or the lessee’s
inkremental penyewa pada tanggal efektif incremental borrowing rate at the effective
modifikasi, jika suku bunga implisit dalam date of the modification, if the interest rate
sewa tidak dapat ditentukan. implicit in the lease cannot be readily
determined.

Untuk modifikasi sewa yang tidak dicatat For a lease modification that is not accounted
sebagai sewa terpisah, penyewa mencatat for as a separate lease, the lessee shall
pengukuran kembali liabilitas sewa dengan: account for the measurement of the lease
liability by:

- menurunkan jumlah tercatat aset hak - decreasing the carrying amount of the
guna untuk merefleksikan penghentian right-of-use asset to reflect the partial or
parsial atau penuh sewa untuk modifikasi full termination of the lease for lease
sewa yang menurunkan ruang lingkup modifications that decrease the scope of
sewa. Penyewa mengakui dalam laba rugi the lease. The lessee shall recognise in
setiap keuntungan atau kerugian yang profit or loss any gain or loss relating to
terkait dengan penghentian parsial atau the partial or full termination of the lease.
penuh sewa tersebut.
- membuat penyesuaian terkait dengan - making a corresponding adjustment to
aset hak guna untuk seluruh modifikasi the right-of-use asset for all other lease
sewa lainnya. modifications.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/34 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

m. Biaya pinjaman m. Borrowing costs

Biaya bunga dan biaya pinjaman lainnya, Interest and other borrowing costs, such as
seperti biaya diskonto pinjaman baik yang discount fees on loans either directly or
secara langsung atau tidak langsung digunakan indirectly used in financing the construction of a
untuk pendanaan konstruksi aset kualifikasian, qualifying asset, are capitalised up to the date
dikapitalisasi hingga aset tersebut selesai when construction is complete. For borrowings
dikonstruksi. Untuk biaya pinjaman yang dapat that are directly attributable to a qualifying
diatribusikan secara langsung pada aset asset, the amount to be capitalised is
kualifikasian, jumlah yang dikapitalisasi determined as the actual borrowing cost
ditentukan dari biaya pinjaman aktual yang incurred during the year, less any income
terjadi selama tahun berjalan, dikurangi earned on the temporary investment of such
penghasilan yang diperoleh dari investasi borrowings. For borrowings that are not directly
sementara atas dana hasil pinjaman tersebut. attributable to a qualifying asset, the amount to
Untuk pinjaman yang tidak dapat diatribusikan be capitalised is determined by applying a
secara langsung pada suatu aset kualifikasian, capitalisation rate to the amount expended on
jumlah yang dikapitalisasi ditentukan dengan the qualifying assets. The capitalisation rate is
mengalikan tingkat kapitalisasi terhadap jumlah the weighted average of the total borrowing
yang dikeluarkan untuk memperoleh aset costs applicable to the total borrowings
kualifikasian. Tingkat kapitalisasi dihitung outstanding during the period, other than
berdasarkan rata-rata tertimbang biaya borrowings made specifically for the purpose of
pinjaman yang dibagi dengan jumlah pinjaman obtaining a qualifying asset.
yang tersedia selama periode, selain pinjaman
yang secara spesifik diambil untuk tujuan
memperoleh suatu aset kualifikasian.

n. Properti investasi n. Investment properties

Properti investasi adalah properti (tanah dan Investment properties are properties (land and
hak atas tanah atau bangunan atau bagian dari land rights or a building or part of a building or
suatu bangunan atau kedua-duanya) yang both) held by the owner or the lessee under a
dikuasai oleh pemilik atau penyewa melalui finance lease to earn rentals or for capital
sewa pembiayaan untuk menghasilkan sewa appreciation or both, rather than for use in the
atau untuk kenaikan nilai atau kedua-duanya, production or supply of goods or services or for
dan tidak untuk digunakan dalam produksi atau administrative purposes; or sale in the daily
penyediaan barang atau jasa atau untuk tujuan business activities.
administratif; atau dijual dalam kegiatan usaha
sehari-hari.

Properti investasi diakui sebagai aset jika dan Investment property is recognised as an asset
hanya jika besar kemungkinan manfaat when, and only when it is probable that the
ekonomis masa depan yang terkait dengan future economic benefits that are associated
properti investasi akan mengalir ke entitas; dan with the investment property will flow to the
biaya perolehan properti investasi dapat diukur entity; and the cost of the investment property
dengan andal. can be measured reliably.

Properti investasi pada awalnya diukur sebesar An investment property shall be measured
biaya perolehan, meliputi harga pembelian dan initially at its cost, comprising its purchase price
setiap pengeluaran yang dapat diatribusikan and any directly attributable expenditure
secara langsung (biaya jasa hukum, pajak (professional fees for legal services, property
pengalihan properti, dan biaya transaksi lain). transfer taxes and other transaction costs).
Biaya transaksi termasuk dalam pengukuran Transaction costs are included in the initial
awal tersebut. measurement.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/35 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

n. Properti investasi (lanjutan) n. Investment properties (continued)

Setelah pengakuan awal, Grup memilih After initial recognition, the Group chooses to
menggunakan model nilai wajar dan mengukur use the fair value model and measure all of its
seluruh properti investasi berdasarkan nilai investment properties at fair value. Any gain or
wajar. Keuntungan atau kerugian yang timbul loss arising from a change in the fair value of
dari perubahan nilai wajar properti investasi investment property is recognised in profit or
diakui dalam laba rugi pada tahun terjadinya. loss for the year in which it arises.

Nilai wajar didasarkan kepada harga pasar aktif, Fair value is based on active market prices,
disesuaikan, jika perlu, dengan perbedaan adjusted, if necessary, for differences in the
alam, lokasi atau kondisi dari aset tersebut. Jika nature, location or condition of the specific
informasi tersebut tidak tersedia, Grup asset. If this information is not available, the
menggunakan metode penilaian alternatif, Group uses alternative valuation methods, such
seperti harga terbaru di pasar yang kurang aktif as recent prices on less active markets or
atau proyeksi arus kas yang didiskontokan. discounted cash flow projections.

Penentuan nilai wajar investasi dilakukan pada The fair value of investment property as at the
tanggal posisi keuangan didasarkan pada financial position date is based on an annual
penilaian oleh penilai independen yang valuation by an independent valuer who holds a
mempunyai kualifikasi profesional yang telah recognised and relevant professional
diakui dan relevan serta memiliki pengalaman qualification and has recent experience in the
terkini di lokasi dan kategori properti investasi location and category of the investment property
yang dinilai. Penilaian ini membentuk dasar being valued. These valuations form the basis
untuk nilai tercatat pada laporan keuangan for the carrying amounts in the consolidated
konsolidasian. financial statements.

Properti investasi dihentikan pengakuannya Investment properties are derecognised either


pada saat dilepaskan (pada tanggal penerima when they have been disposed of (i.e., at the
mendapatkan kontrol) atau ketika tidak date the recipient obtains control) or when they
digunakan lagi secara permanen dan tidak are permanently withdrawn from use and no
memiliki manfaat ekonomi masa depan yang future economic benefit is expected from their
diperkirakan dari pelepasannya. Selisih antara disposal. The difference between the net
hasil neto pelepasan dan jumlah tercatat aset disposal proceeds and the carrying amount of
diakui dalam laba rugi pada tahun terjadinya the asset is recognised in profit or loss in the
penghentian atau pelepasan. Dalam year of derecognition. In determining the
menentukan nilai pertimbangan dari pelepasan amount of consideration from the derecognition
properti investasi, Grup mempertimbangkan of investment property, the Group considers the
dampak dari variabel pertimbangan, adanya effects of variable consideration, existence of a
komponen pembiayaan yang signifikan, dan significant financing component, non-cash
pertimbangan utang ke pembeli (jika ada). consideration, and consideration payable to the
buyer (if any).

Pengalihan dilaksanakan ke (atau dari) properti Transfers are made to (or from) investment
investasi hanya ketika adanya perubahan property only when there is a change in use.
pemakaian. Untuk pengalihan dari properti For a transfer from investment property to
investasi menjadi properti yang ditempati owner-occupied property, the deemed cost for
pemilik, biaya yang dianggap untuk akuntansi subsequent accounting is the fair value at the
selanjutnya adalah nilai wajar pada tanggal date of change in use. If owner-occupied
perubahan pemakaian tersebut. Jika properti property becomes an investment property, the
yang ditempati pemilik menjadi properti Group accounts for such property in accordance
investasi, Grup mengakui properti tersebut with the policy stated under property, plant and
sesuai dengan kebijakan yang tercantum pada equipment up to the date of change in use.
aset tetap sampai tanggal perubahan
pemakaian.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/36 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

o. Aset takberwujud o. Intangible assets

Piranti lunak komputer Computer software

Biaya yang terkait dengan pemeliharaan Costs associated with maintaining computer
program piranti lunak komputer diakui sebagai software programs are recognised as an
beban pada saat terjadinya. Biaya expense as incurred. Development costs that
pengembangan yang dapat secara langsung are directly attributable to the design and testing
diatribusikan kepada desain dan pengujian of identifiable and unique software products
produk piranti lunak yang dapat diidentifikasi controlled by the Group are recognised as
dan unik yang dikendalikan oleh Grup diakui intangible assets. Directly attributable costs are
sebagai aset takberwujud. Biaya yang dapat capitalised as part of the software product
diatribusikan secara langsung dikapitalisasi include the software development employee
sebagai bagian produk piranti lunak mencakup costs and an appropriate portion of relevant
beban pekerja pengembang piranti lunak dan overheads. Computer software development
bagian overhead yang relevan. Biaya costs recognised as assets are amortised using
pengembangan piranti lunak komputer diakui the straight line method over their estimated
sebagai aset yang diamortisasi dengan metode useful lives of between four to five years.
garis lurus berdasarkan estimasi masa
manfaatnya antara 4 sampai dengan 5 tahun.

Biaya legal terkait pembaruan tanah dan hak Legal costs to renew land and land rights
atas tanah

Biaya legal terkait dengan pembaruan tanah Legal costs related to renewal of land and land
dan hak atas tanah diakui sebagai aset rights are recognised as intangible assets and
takberwujud dan diamortisasi sepanjang umur amortised over the period of the land or land
hukum tanah dan hak atas tanah antara 20 rights between 20 to 30 years.
sampai dengan 30 tahun.

p. Biaya dibayar di muka p. Prepaid expenses

Biaya dibayar di muka diamortisasi selama Prepaid expenses are amortised over the
periode manfaat dengan menggunakan metode periods benefited using the straight line method.
garis lurus.

q. Kas dan setara kas q Cash and cash equivalents

Kas dan setara kas termasuk kas, kas di bank, Cash and cash equivalents consist of cash on
dan deposito berjangka yang jatuh tempo dalam hand, cash in banks and time deposits with
jangka waktu tiga bulan atau kurang pada saat maturity periods of three months or less at the time
penempatan yang tidak digunakan sebagai of placement that are not used as collateral or are
jaminan atau tidak dibatasi penggunaannya. not restricted.

Laporan arus kas konsolidasian disusun The consolidated statements of cash flows have
menggunakan metode langsung dengan been prepared using the direct method by
mengklasifikasikan arus kas berdasarkan classifying the cash flows on the basis of
aktivitas operasi, investasi, dan pendanaan. operating, investing, and financing activities.

r. Persediaan r. Inventories

Persediaan suku cadang, bahan bakar, minyak Spare parts, fuel, lubricants, tools and supplies
pelumas, perlengkapan, dan bahan pendukung are valued at cost less a provision for obsolete
dinilai dengan harga perolehan dikurangi and slow moving inventory. Cost is determined
dengan provisi persediaan usang dan bergerak based on the moving average method. A
lambat. Harga perolehan ditentukan dengan provision for obsolete and slow moving
metode rata-rata bergerak. Provisi persediaan inventory is determined on the basis of
usang dan bergerak lambat ditentukan estimated future usage of individual inventory
berdasarkan estimasi penggunaan jenis items.
persediaan pada masa mendatang.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/37 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

s. Pengakuan pendapatan dan beban s. Revenue and expense recognition

Pendapatan dari kontrak dengan pelanggan Revenue from contracts with customers

Pengakuan pendapatan harus memenuhi 5 Revenue recognition has to fulfil 5 (five) steps of
(lima) langkah penilaian sebagai berikut: assessment as follows:

i. identifikasi kontrak dengan pelanggan; i. identify contract(s) with a customer;


ii. identifikasi kewajiban pelaksanaan dalam ii. identify the performance obligations in the
kontrak. Kewajiban pelaksanaan contract. Performance obligations are
merupakan janji-janji dalam kontrak untuk promises in a contract to transfer to a
menyerahkan barang atau jasa yang customer goods or services that are
memiliki karakteristik berbeda ke distinct;
pelanggan;
iii. penetapan harga transaksi. Harga iii. determine the transaction price.
transaksi merupakan jumlah imbalan yang Transaction price is the amount of
berhak diperoleh suatu entitas sebagai consideration to which an entity expects to
kompensasi atas diserahkannya barang be entitled in exchange for transferring
atau jasa yang dijanjikan ke pelanggan. promised goods or services to a customer.
Jika imbalan yang dijanjikan di kontrak If the consideration promised in a contract
mengandung suatu jumlah yang bersifat includes a variable amount, the Group
variabel, maka Grup membuat estimasi estimates the amount of consideration to
jumlah imbalan tersebut sebesar jumlah which it expects to be entitled in exchange
yang diharapkan berhak diterima atas for transferring the promised goods or
diserahkannya barang atau jasa yang services to a customer less the estimated
dijanjikan ke pelanggan dikurangi dengan amount of service level guarantee which
estimasi jumlah jaminan kinerja jasa yang will be paid during the contract period;
akan dibayarkan selama periode kontrak;
iv. alokasi harga transaksi ke setiap kewajiban iv. allocate the transaction price to each
pelaksanaan dengan menggunakan dasar performance obligation on the basis of the
harga jual berdiri sendiri relatif dari setiap relative stand-alone selling prices of each
barang atau jasa berbeda yang dijanjikan di distinct good or service promised in the
kontrak. Ketika tidak dapat diamati secara contract. Where these are not directly
langsung, harga jual berdiri sendiri relatif observable, the relative stand-alone selling
diperkirakan berdasarkan biaya yang prices are estimated based on expected
diharapkan ditambah marjin; dan cost plus margin; and
v. pengakuan pendapatan ketika kewajiban v. recognise revenue when the performance
pelaksanaan telah dipenuhi dengan obligation is satisfied by transferring a
menyerahkan barang atau jasa yang promised good or service to a customer
dijanjikan ke pelanggan (ketika pelanggan (which is when the customer obtains
telah memiliki kendali atas barang atau control of that good or service).
jasa tersebut).

Kewajiban pelaksanaan dapat dipenuhi dengan A performance obligation may be satisfied at


cara sebagai berikut: the following:
- Pada waktu tertentu (umumnya janji untuk - A point in time (typically for promises to
menyerahkan barang ke pelanggan); atau transfer goods to a customer); or
- Sepanjang waktu (umumnya janji untuk - Over time (typically for promises to transfer
menyerahkan jasa ke pelanggan). Untuk services to a customer). For a performance
kewajiban pelaksanaan yang dipenuhi obligation satisfied over time, the Group
sepanjang waktu, Grup memilih ukuran selects an appropriate measure of progress
penyelesaian yang sesuai untuk penentuan to determine the amount of revenue that
jumlah pendapatan yang harus diakui should be recognised as the performance
karena telah terpenuhinya kewajiban obligation is satisfied.
pelaksanaan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/38 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

s. Pengakuan pendapatan dan beban (lanjutan) s. Revenue and expense recognition


(continued)

Penjualan tenaga listrik Sale of electricity

Pendapatan penjualan listrik diakui berdasarkan Revenue from the sale of electricity is
pemakaian energi listrik (kWh). Umumnya, recognised based on customers’ electricity
pelanggan dapat membeli token mereka sendiri usage (kWh). Generally, customers can buy
("prabayar") atau ditagih setiap bulan their own token (“prepaid”) or are billed monthly
("pascabayar"). Untuk pelanggan pascabayar, (“postpaid”). For postpaid customers, revenue
pendapatan dari penjualan listrik diakui setiap from sale of electricity is recognised monthly
bulan berdasarkan hasil baca meter atas based on the meter reading result of each
pemakaian pelanggan. Untuk pelanggan customer. For prepaid customers, the Group
prabayar, Grup mengakui pendapatan recognises the revenue based on the estimated
berdasarkan estimasi jumlah penggunaan token usage of the customer during the period. The
pelanggan pada periode tertentu. Penerimaan prepayment from customers received is
dimuka dari pelanggan telah dicatat pada utang recorded under other payables.
lain-lain.

Subsidi listrik Pemerintah The Government’s electricity subsidy

Pendapatan subsidi merupakan pendapatan Subsidy revenue represents the revenue from
dari Pemerintah Indonesia atas selisih antara the Government of Indonesia for the difference
biaya yang diperbolehkan ditambah marjin 7% between allowable cost plus 7% margin and the
dengan harga jual aktual per masing-masing actual sales price for each tariff group except for
golongan tarif kecuali untuk golongan tarif yang tariff groups for which tariff adjustments were
diberlakukan penyesuaian tarif menurut applied based on Minister of Energy and
Peraturan Menteri Energi dan Sumber Daya Mineral Resources (“ESDM”) Regulation No. 28
Alam Mineral (“ESDM”) No. 28 Tahun 2016 Year 2016 regarding tariff for electricity provided
tentang tarif tenaga listrik yang disediakan oleh by Perusahaan Perseroan (Persero) PT
Perusahaan Perseroan (Persero) PT Perusahaan Listrik Negara with the latest
Perusahaan Listrik Negara sebagaimana amendment by Regulation of the Minister of
terakhir diubah dengan Peraturan Menteri ESDM No. 3 Year 2020.
ESDM No. 3 Tahun 2020.

Subsidi listrik Pemerintah diakui sebagai The Government’s electricity subsidy is


pendapatan berdasarkan berita acara verifikasi recognised as revenue based on a monthly
bulanan dimana tertera berapa jumlah subsidi verification report where the amount of subsidy
yang akan dibayarkan oleh Pemerintah dan to be paid by the Government is stated and has
telah diakui sebagai kewajiban oleh Pemerintah been recognised as an obligation by the
Indonesia. Nilai subsidi listrik Pemerintah pada Government of Indonesia. The Government’s
akhir tahun perlu diaudit oleh Badan Pemeriksa electricity subsidy value at the end of the year is
Keuangan (“BPK”). subjected to Supreme Audit Agency (“BPK”)
audit.

Pendapatan kompensasi Compensation income

Pendapatan kompensasi merupakan Compensation income is income from the


pendapatan dari Pemerintah Indonesia atas tarif Government of Indonesia for non-subsidy tariff
golongan non-subsidi yang sejak tahun 2017 groups which since 2017, have not experienced
tidak mengalami perubahan kenaikan tarif. a tariff adjustment. Compensation from the
Kompensasi dari Pemerintah diakui sebagai Government is recognised as income based on
pendapatan berdasarkan Laporan Hasil the Audit Report (“LHP”) of the State
Pemeriksaan (“LHP”) Badan Pengawasan Development Audit Agency (“BPKP”) and/or
Keuangan dan Pembangunan (“BPKP”) BPK of the Republic of Indonesia and the
dan/atau BPK Republik Indonesia dan amount has been recognised as an obligation
jumlahnya telah diakui sebagai kewajiban oleh by the Government of Indonesia.
Pemerintah Indonesia.

Nilai kompensasi merupakan estimasi The compensation value is a management


manajemen yang pada akhir tahun akan direviu estimate which at the end of the year will be
oleh BPKP dan/atau BPK. reviewed by BPKP and/or BPK.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/39 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

s. Pengakuan pendapatan dan beban (lanjutan) s. Revenue and expense recognition


(continued)

Biaya penyambungan pelanggan Customer connection fees

Grup menganggap biaya penyambungan yang The Group views connection fees received from
diterima dari pelanggan yang digunakan untuk customers that are used to construct or acquire
membangun atau mengakuisisi aset tetap untuk property, plant and equipment to connect the
menghubungkan pelanggan secara tidak customers as indirectly related to the promise of
langsung berkaitan erat dengan pasokan listrik providing supply of electricity to the customers.
kepada pelanggan. Pasokan listrik dan biaya Supply of electricity and connection fees are not
penyambungan merupakan satu kesatuan distinct because the customers cannot benefit
karena pelanggan tidak dapat memperoleh from these two services on their own. The
manfaat dari kedua layanan ini sendiri. connection infrastructure is to fulfil the obligation
Infrastruktur penyambungan berfungsi untuk to supply electricity to the customers. Both the
memenuhi kewajiban penyediaan tenaga listrik supply of electricity and connection fees are
kepada pelanggan. Pasokan listrik dan biaya substantially the same and have the same
penyambungan pada dasarnya sama, dan pattern of transfer to the customers. Therefore,
memiliki pola transfer yang sama ke pelanggan. connection fees and the supply of electricity are
Oleh karena itu, biaya penyambungan dan one performance obligation. As such,
pasokan tenaga listrik merupakan satu connection fees are recognised as deferred
kewajiban pelaksanaan. Dengan demikian, revenue and amortised at the rate of 5% per
biaya penyambungan diakui sebagai annum starting from the connection date.
pendapatan ditangguhkan dan diamortisasi
dengan tarif 5% per tahun terhitung sejak
tanggal koneksi.

Penjualan batubara Sales of coal

Pendapatan penjualan diakui pada setiap Sales revenue is recognised on each individual
penjualan individu ketika mengontrol transfer ke sale when control transfers to the customer.
pelanggan. Kontrol beralih ke pelanggan dan Control passes to the customer and sales
pendapatan penjualan diakui ketika batu bara revenue is recognised when the coal is loaded
dimuat ke kapal dimana batubara akan dikirim onto the vessel on which the coal will be
ke pelabuhan tujuan atau tempat pelanggan. shipped to the destination port or the customer’s
premises.

Grup menjual batubara dengan syarat Free on The Group generally sells its coal products
Board (“FOB”), di mana Grup tidak memiliki under Free on Board (“FOB”) terms, where the
tanggung jawab untuk pengangkutan atau Group has no responsibility for freight or
asuransi setelah kontrol barang telah berlalu di insurance once control of the goods has passed
pelabuhan muat. Untuk jangka waktu ini hanya at the loading port. For this term there is only
ada satu kewajiban pelaksanaan, yaitu untuk one performance obligation, being for provision
penyediaan produk pada titik di mana kontrol of product at the point where control passes. In
lewat. Selain itu juga, Grup menjual batubara addition, the Group also sells coal under Cost,
dengan syarat Cost, Insurance and Freight Insurance and Freight (“CIF”) terms, but under
(“CIF”), tetapi berdasarkan perjanjian penjualan, the sales agreement, the title and risk of loss of
kepemilikan dan risiko kerugian atas batubara coal shall remain with the Group until such coal
akan tetap berada pada Grup sampai batubara passes at the discharging port.
melewati pelabuhan bongkar.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/40 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

s. Pengakuan pendapatan dan beban (lanjutan) s. Revenue and expense recognition


(continued)

Penjualan batubara (lanjutan) Sales of coal (continued)

Oleh karena itu, Grup menganggap bahwa As such, the Group considers that the insurance
biaya asuransi dan pengangkutan bukan and freight costs are not separate performance
merupakan kewajiban pelaksanaan terpisah obligations but one performance obligation with
melainkan satu kesatuan dengan kewajiban the sale of coal, because the control over coal
pelaksanaan dengan penjualan batubara supplies passes to the buyer when the coal has
dikarenakan kontrol atas persediaan batubara arrived at the buyer’s location. Accordingly, the
berpindah ke pembeli pada saat batubara Group does not have any separate performance
tersebut sudah sampai di lokasi pembeli. Oleh obligations for the transportation and insurance
karena itu Grup tidak memiliki kewajiban services provided.
pelaksanaan terpisah untuk jasa pengangkutan
dan asuransi yang disediakan.

Pendapatan usaha lainnya Other revenues

Pendapatan usaha lainnya merupakan Other revenues consist of telecommunications


pendapatan yang berasal dari pelayanan network and services, transformer rental and
jaringan dan jasa telekomunikasi, sewa trafo other administrative services. Revenue from
dan jasa-jasa administratif lainnya. Pendapatan providing services is recognised in the
dari pemberian jasa diakui pada periode accounting period in which the services are
akuntansi saat jasa tersebut telah diberikan. rendered. For fixed-price contracts, revenue is
Untuk kontrak harga tetap, pendapatan diakui recognised based on the actual service
berdasarkan servis aktual yang diberikan provided to the end of the reporting period as a
hingga akhir periode pelaporan sebagai proportion of the total services to be provided
proporsi dari total servis yang akan diberikan because the customers received and consumed
karena pelanggan telah menerima dan the benefit simultaneously.
menggunakan manfaat secara simultan.

Komponen pembiayaan Financing component

Grup tidak memperkirakan adanya kontrak di The Group does not expect to have any
mana jangka waktu antara pengalihan barang contracts where the period between the transfer
atau jasa yang dijanjikan kepada pelanggan of the promised goods or services to the
dan pembayaran oleh pelanggan melebihi satu customer and payment by the customer
tahun. Akibatnya, Grup tidak menyesuaikan exceeds one year. As a consequence, the
harga transaksi apa pun dengan nilai waktu Group does not adjust any of the transaction
uang. prices for the time value of money.

Beban Expenses

Beban diakui pada saat terjadinya dengan Expenses are recognised as incurred on an
dasar akrual. accrual basis.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/41 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

t. Imbalan kerja t. Employee benefits

Imbalan pascakerja Post-employment benefits

Skema pensiun diklasifikasikan sebagai Pension schemes are classified as either


program iuran pasti atau program manfaat defined contribution plans or defined benefit
pasti, tergantung pada substansi ekonomi dari plans, depending on the economic substance of
syarat dan kondisi utama program tersebut. the plan as derived from its principal terms and
Program iuran pasti adalah program pensiun conditions. A defined contribution plan is a
yang mewajibkan Grup membayar sejumlah pension plan under which the Group pays fixed
iuran tertentu kepada entitas terpisah. Grup contributions into a separate entity. The Group
tidak memiliki kewajiban hukum atau konstruktif has no legal or constructive obligations to pay
untuk membayar iuran lebih lanjut jika entitas further contributions if the fund does not hold
tersebut tidak memiliki aset yang cukup untuk sufficient assets to pay all employees the
membayar seluruh imbalan atas jasa yang benefits relating to employee service in the
diberikan pekerja pada tahun berjalan dan current period and prior years. A defined benefit
tahun-tahun sebelumnya. Program manfaat plan is a pension plan that is not a defined
pasti adalah program pensiun yang bukan contribution plan. Typically, defined benefit
merupakan program iuran pasti. Program plans define an amount of pension benefit that
manfaat pasti adalah program pensiun yang an employee will receive upon retirement,
menentukan jumlah imbalan pensiun yang akan usually dependent on one or more factors such
diterima seorang pekerja pada saat pensiun, as age, years of service and compensation.
biasanya berdasarkan pada satu atau lebih
faktor seperti usia, masa kerja, dan kompensasi.

Grup harus mencadangkan jumlah minimal The Group is required to provide a minimum
imbalan pensiun sesuai dengan Peraturan amount of pension benefit in accordance with
Ketenagakerjaan atau Perjanjian Kerja Manpower Regulations or the Group’s
Bersama (“PKB”), mana yang lebih tinggi. Collective Labour Agreement (the “CLA”),
Karena Peraturan Ketenagakerjaan atau PKB whichever is higher. Since the Manpower
menentukan rumus tertentu untuk menghitung Regulations or the CLA set the formula for
jumlah minimal imbalan pensiun, pada determining the minimum amount of benefits, in
dasarnya, program pensiun berdasarkan substance pension plans under the Manpower
Peraturan Ketenagakerjaan atau PKB adalah Regulations or the CLA represent defined
program manfaat pasti. benefit plans.

Sehubungan dengan program manfaat pasti, The liability recognised in the consolidated
liabilitas diakui pada laporan posisi keuangan statement of financial position in respect of
konsolidasian setara dengan nilai kini kewajiban defined benefit pension program is equivalent to
manfaat pasti pada akhir tahun pelaporan the present value of the defined benefit
dikurangi nilai wajar aset program. Kewajiban obligation at the end of the reporting year less
manfaat pasti dihitung setiap tahun oleh the fair value of plan assets. The defined benefit
aktuaris independen dengan menggunakan obligation is calculated annually by independent
metode Projected Unit Credit. Imbalan actuaries using the Projected Unit Credit
pascakerja terdiri dari imbalan pesangon dan method. Post-employment benefits consist of
penghargaan purna jabatan. severance benefits and employment award.

Nilai kini kewajiban manfaat pasti ditentukan The present value of the defined benefit
dengan mendiskontokan arus kas keluar yang obligation is determined by discounting the
diestimasi dengan menggunakan tingkat bunga estimated future cash outflows using the
obligasi korporat berkualitas tinggi dalam interest rates of high-quality corporate bonds
denominasi mata uang dimana imbalan akan that are denominated in the currency in which
dibayarkan dan memiliki jangka waktu jatuh the benefits will be paid, and that have terms of
tempo mendekati jangka waktu kewajiban maturity approximating the terms of the related
pensiun. Apabila tidak terdapat pasar aktif untuk pension obligations. When there is no deep
obligasi korporat tersebut, digunakan bunga market for such bonds, the market rates of
obligasi Pemerintah. Government bonds are used.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/42 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

t. Imbalan kerja (lanjutan) t. Employee benefits (continued)

Imbalan pascakerja (lanjutan) Post-employment benefits (continued)

Biaya jasa lalu diakui segera dalam laba rugi. Past service costs are recognised immediately
Keuntungan dan kerugian atas kurtailmen atau in profit or loss. Gains or losses on the
penyelesaian suatu program manfaat pasti curtailment or settlement of a defined benefit
diakui pada saat kurtailmen atau penyelesaian plan are recognised when the curtailment or
tersebut terjadi. settlement occurs.

Pengukuran kembali yang timbul dari Remeasurements arising from experience


penyesuaian pengalaman dan perubahan adjustments and changes in actuarial
asumsi-asumsi aktuarial dibebankan atau assumptions are charged or credited to equity in
dikreditkan pada ekuitas dalam laporan the consolidated statement of other
penghasilan komprehensif lain konsolidasian comprehensive income in the year in which they
pada tahun dimana beban tersebut terjadi. arise. The accumulated remeasurements
Akumulasi saldo pengukuran kembali balance is reported in retained earnings.
dilaporkan di saldo laba.

Untuk program iuran pasti, Grup membayar For defined contribution plans, the Group pays
iuran kepada dana pensiun yang dikelola oleh contributions to publicly or privately managed
publik atau swasta. Grup tidak memiliki pension plans. The Group has no further
kewajiban membayar lebih lanjut jika iuran payment obligations once the contributions
tersebut telah dibayarkan. Iuran tersebut diakui have been paid. The contributions are
sebagai beban imbalan kerja ketika jatuh recognised as employee benefit expenses when
tempo. Iuran dibayar di muka diakui sebagai they become due. Prepaid contributions are
aset sepanjang pengembalian dana atau recognised as an asset to the extent that a cash
pengurangan pembayaran masa depan refund or reduction in the future payments is
dimungkinkan. available.

Pesangon pemutusan kontrak kerja Termination benefits

Pesangon pemutusan kontrak kerja dibayarkan Termination benefits are payable when
ketika pekerja diberhentikan, atau ketika employment is terminated by the Group before
pekerja menerima penawaran mengundurkan the normal retirement date, or when an
diri secara sukarela. Grup mengakui pesangon employee accepts voluntary redundancy in
pemutusan kontrak kerja pada tanggal yang exchange for certain benefits. The Group
lebih dahulu dari: (i) ketika Grup tidak bisa lagi recognises termination benefits at the earlier of
membatalkan penawaran pesangon; dan (ii) the following dates: (i) when the Group can no
ketika Grup mengakui biaya untuk longer withdraw the offer of those benefits; and
restrukturisasi yang berada dalam lingkup (ii) when the Group recognises costs for a
PSAK No. 57, “Provisi, Liabilitas Kontinjensi dan restructuring that is within the scope of SFAS
Aset Kontinjensi” dan melibatkan pembayaran No. 57, “Provisions, Contingent Liabilities and
pesangon pemutusan kontrak kerja. Dalam hal Contingent Assets” and involves the payment of
penawaran pengunduran diri secara sukarela, termination benefits. In the case of an offer
pesangon pemutusan kontrak kerja diukur made to encourage voluntary redundancy, the
berdasarkan ekspektasi jumlah karyawan yang termination benefits are measured based on the
menerima penawaran tersebut. Pesangon number of employees expected to accept the
pemutusan kontrak kerja yang jatuh tempo lebih offer. Benefits falling due more than 12 months
dari 12 bulan setelah tanggal pelaporan after the reporting date are discounted to their
didiskontokan ke nilai kini. present value.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/43 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

t. Imbalan kerja (lanjutan) t. Employee benefits (continued)

Imbalan kerja jangka panjang lainnya Other long-term benefits

Grup memberikan imbalan pascakerja lainnya The Group provides other long-term employee
seperti uang cuti besar, tunjangan kecelakaan benefits such as long leave allowance, disability
dinas, bantuan kematian dan penghargaan benefit, death benefit and loyalty benefit. The
kesetiaan kerja. Nilai imbalan yang diberikan benefits paid are based on the Group’s CLA.
didasari pada Perjanjian Kerja Bersama.
Long leave allowance is given to employees
Cuti besar diberikan kepada karyawan yang who have worked for at least six years
telah bekerja sekurang-kurangnya 6 tahun terus continuously. Disability benefit is provided to
menerus. Tunjangan kecelakaan dinas employees who have a work accident. Death
diberikan kepada karyawan yang mengalami benefit is provided to the heirs whether or not
kecelakaan dinas. Bantuan kematian diberikan the employee passes away as a result of a work
kepada ahli waris bagi karyawan yang accident. Loyalty benefit is given every eight
meninggal dunia akibat kecelakaan kerja years for employees who have worked for 16
maupun tidak. Penghargaan kesetiaan kerja years continuously.
diberikan setiap delapan tahun bagi pegawai
yang telah bekerja selama 16 tahun terus
menerus.

Perhitungan imbalan kerja jangka panjang Long-term benefits are determined using the
ditentukan dengan menggunakan metode Projected Unit Credit Method. The long-term
Projected Unit Credit. Jumlah yang diakui employee benefits liabilities recognised in the
sebagai liabilitas imbalan kerja jangka panjang consolidated statement of financial position
di laporan posisi keuangan konsolidasian represent the present value of the defined
merupakan nilai kini liabilitas imbalan kerja benefit obligation.
pasti.

u. Provisi u. Provisions

Provisi diakui ketika Grup memiliki kewajiban Provisions are recognised when the Group has
kini (baik bersifat hukum maupun konstruktif) a present obligation (legal or constructive) as a
sebagai akibat peristiwa masa lalu, result of a past event and it is probable that the
kemungkinan besar Grup diharuskan Group will be required to settle the obligation
menyelesaikan kewajiban dan estimasi andal and a reliable estimate can be made of the
mengenai jumlah kewajiban tersebut dapat amount of the obligation.
dibuat.

Provisi diukur sebesar nilai kini dari estimasi The provisions are measured at the present
terbaik manajemen atas pengeluaran yang value of the management’s best estimate of the
diperlukan untuk menyelesaikan kewajiban kini expenditure required to settle the present
pada akhir periode pelaporan. Tingkat diskonto obligation at the end of the reporting period. The
yang digunakan untuk menentukan nilai kini discount rate used to determine the present
adalah tingkat diskonto sebelum pajak, yang value is a pre-tax rate that reflects current
mencerminkan penilaian pasar kini atas nilai market assessments of the time value of money
waktu uang dan risiko yang terkait dengan and the risks specific to the liability. The
liabilitas tersebut. Peningkatan provisi increase in the provision due to the passage of
sehubungan dengan berlalunya waktu diakui time is recognised as interest expense.
sebagai beban keuangan.

Ketika beberapa atau seluruh manfaat ekonomi When some or all of the economic benefits
untuk penyelesaian provisi yang diharapkan required to settle a provision are expected to be
dapat dipulihkan dari pihak ketiga, piutang recovered from a third party, a receivable is
diakui sebagai aset apabila terdapat kepastian recognised as an asset if it is virtually certain
bahwa penggantian akan diterima dan jumlah that reimbursement will be received, and the
piutang dapat diukur secara andal. amount of the receivable can be measured
reliably.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/44 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

v. Piutang v. Receivables

Piutang usaha merupakan jumlah yang dapat Trade receivables represent amounts due from
diterima dari pelanggan atas penjualan tenaga customers for sales of electricity, primary
listrik, energi primer dan jasa dalam kegiatan energy and services in the normal course of
usaha normal. Piutang lain-lain merupakan business. Other receivables represent
saldo piutang yang tidak terkait dengan receivables that are not related to the normal
kegiatan usaha normal Grup. Jika piutang business activities of the Group. If receivables
diperkirakan dapat ditagih dalam waktu satu are expected to be collected within one year or
tahun atau kurang, piutang diklasifikasikan less, they are classified as current assets.
sebagai aset lancar. Jika tidak, piutang Otherwise, the receivables are presented as
disajikan sebagai aset tidak lancar pada laporan non-current assets in the consolidated
posisi keuangan konsolidasian. statement of financial position

Piutang usaha pada awalnya diakui sebesar Trade receivables are recognised initially at fair
nilai wajar dan kemudian diukur sebesar biaya value and subsequently measured at amortised
perolehan diamortisasi dengan menggunakan cost using the effective interest method, if the
metode suku bunga efektif, jika efek impact of discounting is significant, less any
pendiskontoan signifikan, dikurangi dengan loss allowance.
cadangan kerugian.

Kerugian penurunan nilai piutang disajikan Impairment losses on receivables are presented
sebagai bagian dari beban usaha pada laba as part of operating expenses in profit or loss.
rugi. Jumlah yang selanjutnya dapat dipulihkan Subsequent recoveries of amounts previously
kembali atas piutang yang sebelumnya telah written off are credited against the same line
dihapusbukukan, dikreditkan terhadap item baris item.
yang sama.

Piutang pihak berelasi pada awalnya disajikan Receivables from related parties are initially
sebagai aset tidak lancar kecuali jika ada presented as non-current assets unless there
alasan tertentu untuk disajikan sebagai aset are specific reasons for them to be presented
lancar pada laporan posisi keuangan as current assets in the consolidated
konsolidasian. statements of financial position.

Lihat Catatan 3g untuk informasi lebih lanjut See Note 3g for further information regarding
mengenai kebijakan penentuan jumlah the policy on the determination of the amount
cadangan kerugian piutang Grup. for the loss allowance on the Group’s
receivables.

w. Pajak penghasilan w. Income tax

Beban pajak terdiri dari pajak kini dan pajak Tax expense comprises current and deferred
tangguhan. Pajak diakui dalam laba rugi, tax. Tax is recognised in profit or loss, except to
kecuali jika pajak itu terkait dengan kejadian the extent that it relates to items recognised in
atau transaksi yang diakui di penghasilan other comprehensive income or directly in
komprehensif lain atau langsung diakui ke equity. In this case, the tax expense is
ekuitas. Dalam hal ini, beban pajak tersebut recognised in other comprehensive income or
masing-masing diakui pada penghasilan directly in equity, respectively.
komprehensif lain atau secara langsung dicatat
ke ekuitas.

Beban pajak kini dihitung berdasarkan The current income tax charge is calculated on
peraturan perpajakan yang berlaku pada the basis of the tax laws enacted as at the
tanggal pelaporan keuangan, di negara dimana reporting date in the countries where the Group
Grup beroperasi dan menghasilkan penghasilan operates and generates taxable income.
kena pajak. Manajemen secara periodik Management periodically evaluates the
mengevaluasi posisi yang diambil dalam Surat positions taken in Annual Tax Returns with
Pemberitahuan Tahunan sehubungan dengan respect to situations in which the applicable tax
situasi dimana aturan pajak yang berlaku regulations are subject to interpretation. It
membutuhkan interpretasi atas peraturan pajak establishes a provision where appropriate on
yang berlaku. Jika perlu, manajemen the basis of the amounts expected to be paid to
menentukan provisi dibentuk berdasarkan the tax authorities.
jumlah yang diharapkan akan dibayar pada
otoritas pajak.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/45 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

w. Pajak penghasilan (lanjutan) w. Income tax (continued)

Untuk pendapatan yang menjadi subjek pajak For income which is subject to final tax, tax
penghasilan final, beban pajak diakui secara expenses are recognised proportionally with the
proporsional dengan jumlah pendapatan accounting revenue recognised and presented
akuntansi yang diakui dan disajikan dalam as part of the operating expenses account in the
sebagai bagian dari akun beban operasional current year as such tax does not satisfy the
pada tahun berjalan dikarenakan pajak tersebut criteria of income tax.
tidak memenuhi kriteria sebagai pajak
penghasilan.

Pajak penghasilan tangguhan diakui, dengan Deferred income tax is recognised, using the
menggunakan metode liabilitas untuk semua liability method, on temporary differences
perbedaan temporer antara dasar pengenaan arising between the tax bases of assets and
pajak aset dan liabilitas dengan nilai tercatatnya liabilities and their carrying amounts in the
pada laporan keuangan konsolidasian. Namun, consolidated financial statements. However,
liabilitas pajak tangguhan tidak diakui jika timbul deferred tax liabilities are not recognised if they
dari pengakuan awal goodwill; atau pada saat arise from the initial recognition of goodwill;
pengakuan awal suatu aset atau liabilitas yang deferred income tax is not accounted for if it
timbul dari transaksi selain kombinasi bisnis arises from the initial recognition of an asset or
yang pada saat transaksi tersebut tidak liability in a transaction other than a business
mempengaruhi laba rugi akuntansi maupun combination that at the time of the transaction
laba rugi kena pajak. Pajak penghasilan affects neither accounting nor taxable profit or
tangguhan ditentukan menggunakan tarif pajak loss. Deferred income tax is determined using
yang berlaku atau yang secara substansial the tax rates that have been enacted or
telah berlaku pada akhir tahun pelaporan dan substantially enacted at the end of the reporting
diharapkan diterapkan jika aset pajak year and are expected to apply when the
penghasilan tangguhan direalisasikan atau related deferred income tax asset is realised or
liabilitas pajak tangguhan diselesaikan. the deferred income tax liability is settled.

Aset pajak penghasilan tangguhan diakui hanya Deferred income tax assets are recognised only
jika besar kemungkinan jumlah penghasilan to the extent that it is probable that future
kena pajak di masa depan akan memadai untuk taxable profits will be available against which
dikompensasi dengan perbedaan temporer the temporary differences can be utilised.
yang masih dapat digunakan.

Aset dan liabilitas pajak tangguhan tidak diakui Deferred tax assets and liabilities are not
untuk perbedaan temporer antara nilai tercatat recognised for temporary differences between
dan dasar pengenaan pajak atas dalam dalam the carrying amount and tax bases of
ventura bersama dan asosiasi dimana Grup investments in joint ventures and associates
dapat mengendalikan waktu pembalikan where the Group is able to control the timing of
perbedaan temporer dan kemungkinan the reversal of the temporary differences and it
perbedaan tersebut tidak akan dibalik di masa is probable that the differences will not be
mendatang. reversed in the foreseeable future.

Aset dan liabilitas pajak penghasilan tangguhan Deferred income tax assets and liabilities are
dapat saling hapus jika terdapat hak yang offset when there is a legally enforceable right
berkekuatan secara hukum untuk melakukan to offset current tax assets against current tax
saling hapus antara aset pajak kini dengan liabilities.
liabilitas pajak kini.

x. Aset donasi dari Pemerintah x. Government contributed assets

Aset donasi dari Pemerintah Indonesia, dalam Assets contributed by the Government of
kapasitasnya sebagai pemegang saham Indonesia, in its capacity as a shareholder of the
Perusahaan, diakui sebagai transaksi ekuitas Company, are accounted for as an equity
dengan pemegang saham. Aset yang transaction with the shareholder. The assets are
didonasikan tersebut dicatat sesuai dengan nilai recorded at the transaction costs agreed with
transaksi yang telah disepakati dengan the Government. The Company records the
Pemerintah. Perusahaan mencatat aset donasi Government contributed asset as an addition to
dari Pemerintah sebagai penambahan aset property, plant and equipment with a
tetap dan peningkatan tambahan modal disetor corresponding increase to additional paid-in
oleh pemegang saham. capital by the shareholder.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/46 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

y. Laba per saham y. Earnings per share

Laba per saham dasar dihitung dengan Basic earnings per share is calculated by
membagi laba yang dapat diatribusikan kepada dividing the profit attributable to the equity
pemegang saham Perusahaan dengan jumlah holders of the Company by the weighted
rata-rata tertimbang saham biasa yang beredar average number of ordinary shares outstanding
pada tahun berjalan. for the year.

Laba per saham dilusian dihitung dengan Diluted earnings per share is calculated by
menyesuaikan rata-rata tertimbang jumlah adjusting the weighted average number of
saham biasa yang beredar untuk ordinary shares outstanding to assume the
mengasumsikan konversi seluruh potensi conversion of all dilutive potential ordinary
saham biasa yang dilutif. shares.

z. Informasi segmen z. Segment information

Segmen operasi diidentifikasi berdasarkan Operating segments are identified on the basis of
laporan internal mengenai komponen dari Grup internal reports about components of the Group
yang secara reguler direviu oleh “pengambil and are regularly reviewed by the “chief operating
keputusan operasional” dalam rangka decision maker” in order to allocate resources to
mengalokasikan sumber daya dan menilai the segments and to assess their segment
kinerja segmen operasi. operation performance.

Informasi yang digunakan oleh pengambil Information reported to the chief operating
keputusan operasional dalam rangka alokasi decision maker for the purposes of resource
sumber daya dan penilaian kinerja mereka allocation and assessment of their performance
dikategorikan berdasarkan lokasi geografis di is grouped based on the geographical location
mana penjualan tenaga listrik dilakukan. where electricity sales are made.

aa. Properti pertambangan aa. Mining properties

Biaya pengembangan yang dikeluarkan oleh atau Development expenditure incurred by or on


atas nama Grup diakumulasikan secara terpisah behalf of the Group is accumulated separately
untuk setiap area of interest pada saat cadangan for each area of interest in which economically
terpulihkan yang secara ekonomis dapat recoverable resources have been identified.
diidentifikasi. Biaya tersebut termasuk biaya yang Such expenditure includes costs directly
dapat diatribusikan secara langsung pada attributable to the construction of mines and
konstruksi tambang dan infrastruktur terkait, tidak related infrastructure and excludes physical
termasuk biaya aset berwujud dan hak atas tanah assets and land rights (i.e., right to build, right to
(seperti hak guna bangunan, hak guna usaha, cultivate and right to use), which are recorded
dan hak pakai) yang dicatat sebagai aset tetap. as fixed assets.

ab. Kombinasi bisnis entitas sepengendali ab. Business combinations of entities under
common control

Kombinasi bisnis entitas sepengendali dicatat Business combinations of entities under


menggunakan metode penyatuan kepemilikan common control are accounted for using the
(pooling-of-interest). Selisih antara harga pooling-of-interest method. The difference
pengalihan dengan nilai buku setiap transaksi between the transfer price and the book value of
restrukturisasi antara entitas sepengendali dicatat each restructuring transaction between entities
sebagai bagian dari tambahan modal disetor under common control is recorded as part of
dalam bagian ekuitas di laporan posisi keuangan additional paid-in capital in the equity section of
konsolidasian. the consolidated statement of financial position.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/47 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

3. KEBIJAKAN AKUNTANSI SIGNIFIKAN (lanjutan) 3. SIGNIFICANT ACCOUNTING POLICIES


(continued)

ac. Pinjaman ac. Borrowings

Pada saat pengakuan awal, pinjaman diakui Borrowings are recognised initially at fair value,
sebesar nilai wajar, dikurangi dengan biaya- net of transaction costs incurred. Borrowings
biaya transaksi yang terjadi. Selanjutnya, are subsequently carried at amortised cost; any
pinjaman diukur sebesar biaya perolehan difference between the proceeds (net of
diamortisasi; selisih antara penerimaan transaction costs) and the redemption value is
(dikurangi biaya transaksi) dan nilai pelunasan recognised in the profit or loss over the period
dicatat pada laporan laba rugi selama periode of the borrowings using the effective interest
pinjaman dengan menggunakan metode bunga method.
efektif.

Biaya yang dibayar untuk memperoleh fasilitas Fees paid on the establishment of loan facilities
pinjaman diakui sebagai biaya transaksi are recognised as transaction costs of the loan
pinjaman sepanjang besar kemungkinan to the extent that it is probable that some or all
sebagian atau seluruh fasilitas akan ditarik. of the facility will be drawn down. In this case,
Dalam hal ini, biaya memperoleh pinjaman the fee is deferred until the draw-down occurs.
ditangguhkan sampai penarikan pinjaman To the extent that there is no evidence that it is
terjadi. Sepanjang tidak terdapat bukti bahwa probable that some or all of the facility will be
besar kemungkinan sebagian atau seluruh drawn down, the fee is capitalised as a pre-
fasilitas akan ditarik, biaya memperoleh payment for liquidity services and amortised
pinjaman dikapitalisasi sebagai pembayaran di over the period of the facility to which it relates.
muka untuk jasa likuiditas dan diamortisasi
selama periode fasilitas yang terkait.

Biaya pinjaman akan dihentikan pengakuannya Borrowings are derecognised from the
dari laporan posisi keuangan ketika kewajiban statement of financial position when the
yang tertulis pada kontrak diselesaikan, obligation specified in the contract is
dibatalkan, atau sudah tidak berlaku. Selisih discharged, cancelled or expired. The
antara nilai tercatat dari liabilitas keuangan yang difference between the carrying amount of a
sudah berakhir atau dialihkan ke pihak lain dan financial liability that has been extinguished or
imbalan yang dibayarkan, termasuk aset non transferred to another party and the
kas yang dialihkan atau liabilitas yang consideration paid, including any non-cash
ditanggung, diakui dalam laba rugi sebagai assets transferred or liabilities assumed, is
pendapatan lain-lain atau biaya keuangan. recognised in profit or loss as other income or
finance costs.

Ketika liabilitas keuangan dinegosiasikan Where the terms of a financial liability are
kembali dan entitas mengeluarkan instrumen renegotiated and the entity issues equity
ekuitas kepada kreditor untuk menyelesaikan instruments to a creditor to extinguish all or part
seluruh atau sebagian liabilitas (debt for equity of the liability (debt for equity swap), a gain or
swap), keuntungan atau kerugian diakui dalam loss is recognised in profit or loss, which is
laporan laba rugi yang dicatat sebagai selisih measured as the difference between the
antara jumlah tercatat dari liabilitas keuangan. carrying amount of the financial liability and the
fair value of the equity instruments issued.

Pinjaman diklasifikasikan sebagai liabilitas Loans are classified as current liabilities unless
jangka pendek kecuali Grup memiliki hak tanpa the Group has an unconditional right to defer
syarat untuk menunda pembayaran liabilitas payment of the liability for at least 12 months
selama paling tidak 12 bulan setelah tanggal after the reporting date.
pelaporan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/48 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

4. PERTIMBANGAN AKUNTANSI PENTING DAN 4. CRITICAL ACCOUNTING JUDGEMENTS AND


ESTIMASI AKUNTANSI SIGNIFIKAN SIGNIFICANT ACCOUNTING ESTIMATES

Dalam rangka penerapan kebijakan akuntansi Grup, In the application of the Group’s accounting policies,
sebagaimana dijelaskan dalam Catatan 3, which are described in Note 3, the management is
manajemen diharuskan untuk membuat required to make judgements, estimates and
pertimbangan, estimasi, dan asumsi tentang nilai assumptions about the carrying amounts of assets
aset dan liabilitas yang tidak tersedia dari sumber and liabilities that are not readily apparent from other
lain. Estimasi dan asumsi berdasarkan pengalaman sources. The estimates and associated assumptions
historis dan faktor lain yang dianggap relevan. Hasil are based on historical experience and other factors
aktual dapat berbeda dari estimasi tersebut. that are considered to be relevant. Actual results
may differ from these estimates.

Estimasi dan asumsi yang mendasari direviu secara The estimates and underlying assumptions are
berkelanjutan. Revisi terhadap estimasi akuntansi reviewed on an ongoing basis. Revisions to
akan diakui pada tahun dimana estimasi tersebut accounting estimates are recognised in the year in
direvisi, jika revisi tersebut hanya berpengaruh which the estimate is revised if the revision affects
terhadap tahun tersebut, atau pada tahun revisi dan only that year, or in the year of the revision and
tahun berikutnya jika revisi tersebut mempengaruhi future years if the revision affects both current and
tahun tersebut. future years.

Pertimbangan penting dalam penerapan Critical judgements in applying accounting


kebijakan akuntansi policies

Dalam proses penerapan kebijakan akuntansi yang In the process of applying the accounting policies
dijelaskan dalam Catatan 3, Grup telah menentukan described in Note 3, the Group has identified the
hal-hal berikut yang memerlukan pertimbangan following matters under which significant judgements
signifikan: are made:

Penentuan umur sewa Determining lease term

Penentuan apakah suatu perjanjian mengandung Determining whether an arrangement is or contains


unsur sewa membutuhkan pertimbangan yang a lease requires careful judgement to assess
cermat untuk menilai apakah perjanjian tersebut whether the arrangement conveys a right to obtain
memberikan hak untuk mendapatkan secara substantially all the economic benefits from use of
substansial seluruh manfaat ekonomis dari the asset throughout the period of use and right to
penggunaan aset identifikasian dan hak untuk direct the use of the asset, even if the right is not
mengarahkan penggunaan aset identifikasian, explicitly specified in the arrangement.
bahkan jika hak tersebut tidak dijabarkan secara
eksplisit di perjanjian.

Dalam menentukan jangka waktu sewa, Grup In determining the lease term, management
mempertimbangkan semua fakta dan keadaan yang considers all facts and circumstances that create an
menimbulkan insentif ekonomi untuk menggunakan economic incentive to exercise an extension option,
opsi perpanjangan, atau tidak menggunakan opsi or not exercise a termination option. Extension
penghentian. Opsi perpanjangan (atau tahun setelah options (or years after termination options) are only
opsi penghentian kontrak kerja) hanya termasuk included in the lease term if the lease is reasonably
dalam jangka waktu sewa jika cukup pasti akan certain to be extended (or not terminated). The lease
diperpanjang (atau tidak dihentikan). Umur sewa term is reassessed if an option is actually exercised
dinilai kembali ketika opsi sebenarnya diambil (atau (or not exercised) or the group becomes obliged to
tidak diambil) atau grup menjadi berkewajiban untuk exercise (or not exercise) it. The assessment of
mengambil (atau tidak mengambil) opsi tersebut. reasonable certainty is only revised if a significant
Penilaian kepastian yang wajar hanya direvisi ketika event or a significant change in circumstances
peristiwa signifikan atau perubahan signifikan occurs, which affects this assessment, and that is
terjadi, yang mempengaruhi penilaian ini, dan hal within the control of the lessee.
tersebut dalam pengendalian penyewa.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/49 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

4. PERTIMBANGAN AKUNTANSI PENTING DAN 4. CRITICAL ACCOUNTING JUDGEMENTS AND


ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan) SIGNIFICANT ACCOUNTING ESTIMATES
(continued)

Pertimbangan penting dalam penerapan Critical judgements in applying accounting


kebijakan akuntansi (lanjutan) policies (continued)

Pendapatan dari jasa penyambungan pelanggan Revenues from customer connection fees

Sebagai bagian dari implementasi PSAK No. 72, As a result of the implementation of SFAS No. 72,
Grup telah menilai kembali perlakuan yang the Group has reassessed its treatment of revenue
diterapkan pendapatan dari penyambungan from customer connection fees. The Group has
pelanggan. Grup mempertimbangkan semua fakta considered all relevant facts and circumstances to
dan kondisi yang relevan untuk menentukan determine the exact timing of revenue recognition
pengakuan pendapatan terkait biaya pertaining to connection fees paid by customers. To
penyambungan pelanggan. Untuk itu, Grup perlu do so, the Group needs to determine what
menentukan kewajiban pelaksanaan yang timbul performance obligations it has as a result of
sehubungan dengan penerimaan biaya receiving connection fees. The Group considered
penyambungan dari pelanggan. Grup the fact that the obligation to provide ongoing supply
mempertimbangkan fakta bahwa kewajiban untuk of electricity is regulated by the 2009 Electricity Law
menyediakan tenaga listrik secara berkelanjutan and that the Group charges all customers the same
diatur dalam Undang-Undang Ketenagalistrikan regulated tariff for electricity usage prescribed by the
tahun 2009 dan semua pelanggan dikenakan tarif Government of the Republic of Indonesia. The
listrik yang telah ditentukan oleh Pemerintah receipt of connection fees creates an obligation for
Republik Indonesia untuk penggunaan tenaga listrik. the Group to provide ongoing electricity supply to its
Penerimaan biaya penyambungan menimbulkan customers. The Group has concluded that
kewajiban bagi Grup untuk menyediakan akses connecting the customers to its network is an
listrik secara berkelanjutan kepada pelanggan. Grup obligation which cannot be separated from the
menyimpulkan bahwa menghubungkan pelanggan delivery of electricity.
ke jaringan listrik Perusahaan merupakan kewajiban
yang tidak terpisah dengan penyediaan tenaga listrik
kepada pelanggan.

Kepentingan dalam pengaturan bersama Interest in joint arrangements

Pertimbangan diperlukan untuk menentukan ketika Judgement is required to determine when the Group
Grup memiliki pengendalian bersama, yang has joint control, which requires an assessment of
membutuhkan penilaian mengenai aktivitas yang the relevant activities and when the decisions in
relevan dan ketika keputusan yang berkaitan relation to those activities require unanimous
dengan aktivitas tersebut membutuhkan persetujuan consent. The Group has determined that the
dengan suara bulat. Grup menentukan bahwa relevant activities for its joint arrangements are
aktivitas yang relevan untuk pengaturan bersama those relating to the operating and capital decisions
adalah aktivitas yang berkaitan dengan operasi dan of the arrangement.
pengambilan keputusan dalam pengaturan tersebut.

Pertimbangan juga diperlukan untuk Judgement is also required to classify a joint


mengklasifikasikan pengaturan bersama sebagai arrangement as either a joint operation or a joint
pengendalian bersama atau ventura bersama. venture. Classifying the arrangement requires the
Pengklasifikasian pengaturan tersebut Group to assess its rights and obligations arising
mengharuskan Grup untuk menilai hak dan from the arrangement. Specifically, it considers:
kewajiban yang timbul dari pengaturan tersebut.
Secara khusus, Grup mempertimbangkan:
• Struktur dari pengaturan bersama - apakah • The structure of the joint arrangement - whether
dibentuk melalui kendaraan terpisah; it is structured through a separate vehicle;
• Ketika pengaturan tersebut terstruktur melalui • When the arrangement is structured through a
kendaraan terpisah, Grup juga separate vehicle, the Group also considers the
mempertimbangkan hak dan kewajiban yang rights and obligations arising from:
timbul dari:
- bentuk legal dari kendaraan terpisah; - the legal form of the separate vehicle;
- persyaratan dari perjanjian kontraktual; dan - the terms of the contractual arrangement; and
- fakta dan kondisi lain (ketika relevan). - other facts and circumstances (when
relevant).
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/50 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

4. PERTIMBANGAN AKUNTANSI PENTING DAN 4. CRITICAL ACCOUNTING JUDGEMENTS AND


ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan) SIGNIFICANT ACCOUNTING ESTIMATES
(continued)

Pertimbangan penting dalam penerapan Critical judgements in applying accounting


kebijakan akuntansi (lanjutan) policies (continued)

Kepentingan dalam pengaturan bersama Interest in joint arrangements (continued)


(lanjutan)

Penilaian ini sering membutuhkan pertimbangan This assessment often requires significant
yang signifikan. Kesimpulan yang berbeda judgement. A different conclusion on joint control
mengenai pengendalian bersama dan apakah suatu and also whether the arrangement is a joint
pengaturan adalah sebuah operasi bersama atau operation or a joint venture, may materially impact
ventura bersama, dapat memiliki dampak material the consolidated financial statements.
terhadap laporan keuangan konsolidasian.

Grup memiliki pengaturan bersama yang terstruktur The Group has joint arrangements which are
melalui ventura bersama, lihat Catatan 9 untuk structured through joint ventures, see Note 9 for the
daftar ventura bersama tersebut. Struktur dan list of joint ventures. These structures and the terms
persyaratan dari perjanjian kontraktual of the contractual arrangements indicate that the
mengindikasikan bahwa Grup memiliki hak atas aset Group has rights to the net assets of the
bersih dari pengaturan bersama tersebut. Grup arrangements. The Group has also assessed the
menilai fakta dan kondisi lain yang berkaitan dengan other facts and circumstances relating to these
pengaturan ini dan menyimpulkan bahwa arrangements and concluded that the arrangements
pengaturan tersebut merupakan ventura bersama. are joint ventures.

Sumber ketidakpastian estimasi Sources of estimation uncertainty

Asumsi utama mengenai masa depan dan sumber The key assumptions concerning future and other
estimasi lainnya pada akhir tahun pelaporan, yang key sources of estimation at the end of the reporting
memiliki risiko signifikan yang mengakibatkan year, which have a significant risk of causing a
penyesuaian material terhadap jumlah tercatat aset material adjustment to the carrying amounts of
dan liabilitas dalam tahun pelaporan berikutnya assets and liabilities within the next financial year,
dijelaskan dibawah ini: are discussed below:

Provisi atas kerugian kredit ekspektasian Provision for expected credit losses of trade
piutang usaha dan aset keuangan lainnya receivables and other financial assets

Grup menggunakan matriks provisi untuk The Group uses a provision matrix to calculate
menghitung kerugian kredit ekspektasian piutang expected credit losses for trade receivables. The
usaha. Tingkat provisi adalah berdasarkan hari jatuh provision rates are based on days past due for
tempo atas kelompok segmen pelanggan yang groupings of various customer segments that have
mempunyai karakteristik risiko kredit yang serupa similar credit risk characteristics (e.g., by product
(misalnya berdasarkan tipe produk dan tipe dan/atau type and customer type and/or customer rating).
peringkat pelanggan).

Matriks provisi pada mulanya didasarkan pada The provision matrix is initially based on the Group’s
tingkat gagal bayar historis Grup yang diobservasi. historical observed default rates. The Group will
Grup akan memperbaharui matriks untuk calibrate the matrix to adjust the historical credit loss
menyesuaikan pengalaman kerugian kredit historis experience with forward-looking information. For
dengan informasi forward-looking. Sebagai contoh, instance, if forecast economic conditions are
jika perkiraan atas kondisi ekonomi diperkirakan expected to deteriorate over the next year, which
memburuk selama tahun depan, yang dapat can lead to an increased number of defaults, the
menyebabkan meningkatnya jumlah gagal bayar, historical default rates are adjusted. At every
tingkat gagal bayar historis disesuaikan. Pada setiap reporting date, the historical observed default rates
tanggal pelaporan, tingkat gagal bayar historis are updated and changes in the forward-looking
diperbaharui dan perubahan estimasi forward- estimates are analysed.
looking dianalisis.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/51 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

4. PERTIMBANGAN AKUNTANSI PENTING DAN 4. CRITICAL ACCOUNTING JUDGEMENTS AND


ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan) SIGNIFICANT ACCOUNTING ESTIMATES
(continued)

Sumber ketidakpastian estimasi (lanjutan) Sources of estimation uncertainty (continued)

Provisi atas kerugian kredit ekspektasian Provision for expected credit losses of trade
piutang usaha dan aset keuangan lainnya receivables and other financial assets (continued)
(lanjutan)

Penilaian atas korelasi antara tingkat gagal bayar The assessment of the correlation between historical
historis yang diobservasi, perkiraan atas kondisi observed default rates and forecast economic
ekonomi dan kerugian kredit ekspektasian conditions and expected credit losses is a significant
merupakan estimasi yang signifikan. Jumlah estimate. The amount of expected credit losses is
kerugian kredit ekspektasian paling dipengaruhi oleh sensitive to changes in circumstances and of
perubahan keadaan dan perkiraan kondisi ekonomi. forecast economic conditions. The Group’s historical
Pengalaman kerugian kredit historis Grup dan credit loss experience and forecast of economic
perkiraan kondisi ekonomi juga mungkin tidak conditions may also not be representative of a
menggambarkan gagal bayar aktual pelanggan di customer’s actual default in the future.
masa yang akan datang.

Pengakuan pendapatan Revenue recognition

Penjualan tenaga listrik prabayar Prepaid sales of electricity

Penjualan tenaga listrik prabayar mencakup Prepaid sales of electricity includes an estimate of
estimasi atas listrik yang dikonsumsi oleh pelanggan electricity consumed by customers between the date
antara tanggal pembelian token terakhir dan akhir of the last token purchased and the financial year
tahun keuangan Grup. Estimasi dilakukan dengan end of the Group. An estimate is made by prorating
memproratakan jumlah hari antara tanggal terakhir the total days between the date of the last token
pembelian token yang dibeli dengan tanggal laporan purchased and the date of the Group’s financial
keuangan Grup dengan konsumsi historis statement using the historical consumption of the
pelanggan. customers.

Biaya penyambungan pelanggan Customer connection fees

Jasa koneksi yang diserahkan kepada pelanggan A connection service which is provided to the
tidak merepresentasikan nilai yang berdiri sendiri customer does not represent a stand-alone value for
(stand-alone value) untuk pelanggan tersebut. that customer. Consequently, the Group recognises
Sebagai hasilnya, Grup mencatat biaya connection fees received from customers to connect
penyambungan yang diterima dari pelanggan untuk the customers to its network as revenue over time
menghubungkan pelanggan ke jaringan listrik Grup and amortises it starting from the connection date
sebagai pendapatan yang diakui sepanjang waktu based on the estimated consumption pattern of the
dan diamortisasi sejak tanggal penyambungan customer. The customers’ consumption is estimated
sesuai masa estimasi konsumsi pelanggan. based on the average useful life of the distribution
Konsumsi pelanggan diestimasi berdasarkan rata- assets. Given the wide variety of distribution assets
rata masa manfaat aset distribusi. Dengan and remaining useful lives, the Group has applied an
mempertimbangkan banyaknya variasi aset average life of 20 years, which the Group believes to
distribusi dan masa manfaat atas aset-aset tersebut, be representative of the useful lives of the assets. A
Grup telah menerapkan rata-rata masa manfaat 20 change in the estimated useful lives of distribution
tahun yang di percaya telah merepresentasikan assets would result in a change in the revenue
keseluruhan masa manfaat. Perubahan estimasi recognised from connection fees.
atas masa manfaat aset distribusi akan
mengakibatkan perubahan pada pengakuan
pendapatan dari biaya penyambungan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/52 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

4. PERTIMBANGAN AKUNTANSI PENTING DAN 4. CRITICAL ACCOUNTING JUDGEMENTS AND


ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan) SIGNIFICANT ACCOUNTING ESTIMATES
(continued)

Sumber ketidakpastian estimasi (lanjutan) Sources of estimation uncertainty (continued)

Taksiran masa manfaat ekonomis aset tetap Estimated useful lives of property, plant and
equipment

Masa manfaat setiap aset tetap yang dimiliki Grup The useful life of each item of the Group’s property,
ditentukan berdasarkan periode aset tersebut plant, and equipment is estimated based on the
diharapkan masih dapat digunakan. Estimasi ini period over which the asset is expected to be
ditentukan berdasarkan evaluasi teknis internal dan available for use. Such estimation is based on
pengalaman atas aset sejenis. Masa manfaat setiap internal technical evaluation and experience with
aset direviu secara periodik dan disesuaikan apabila similar assets. The estimated useful life of each
prakiraan berbeda dengan estimasi sebelumnya asset is reviewed periodically and updated if
karena keausan, keusangan teknis dan komersial, expectations differ from previous estimates due to
hukum atau keterbatasan lainnya atas pemakaian physical wear and tear, technical or commercial
aset. Namun terdapat kemungkinan bahwa hasil obsolescence and legal or other limits on the use of
operasi dimasa mendatang dapat dipengaruhi the asset. It is possible, however, that future results
secara signifikan oleh perubahan atas jumlah serta of operations could be materially affected by
tahun pencatatan beban yang diakibatkan karena changes in the amounts and timing of recorded
perubahan faktor yang disebutkan di atas. expenses brought about by changes in the factors
mentioned above.

Perubahan masa manfaat aset tetap dapat A change in the estimated useful life of any item of
mempengaruhi jumlah biaya penyusutan yang diakui property, plant and equipment would affect the
dan nilai tercatat aset tetap. recorded depreciation expense and the carrying
values of property, plant and equipment.

Nilai wajar aset tetap dan properti investasi yang Fair value of property, plant and equipment and
menggunakan model revaluasi investment properties that use the revaluation
model

Dalam proses revaluasi aset, manajemen, dengan In the process of asset revaluation, management,
bantuan penilai publik independen, menentukan with the assistance of an independent public valuer,
data dan asumsi, menelaah metode penilaian serta determines the data inputs and assumptions,
berdiskusi dengan penilai. Pendekatan dan metode assesses valuation methods, and holds discussions
yang digunakan dalam melakukan revaluasi with the valuers as part of the valuation process.
tergantung pada kelas aset. Walaupun data dan The approaches and methods used in the
asumsi Grup dianggap tepat dan wajar, namun revaluation depend on the asset class. While it is
perubahan signifikan pada data input atau asumsi believed that the Group’s data and assumptions are
yang digunakan dapat berpengaruh secara reasonable and appropriate, significant changes in
signifikan terhadap nilai aset yang menggunakan data inputs or significant changes in assumptions
model revaluasi. may materially affect the value of assets that use the
revaluation model.

Rincian dari pendekatan dan data input signifikan Details of the valuation approach and significant
yang digunakan dalam melakukan revaluasi aset data inputs used in the revaluation of property, plant
tetap dan properti investasi diungkapkan masing- and equipment and investment properties are
masing dalam Catatan 6 dan 8. disclosed in Notes 6 and 8, respectively.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/53 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

4. PERTIMBANGAN AKUNTANSI PENTING DAN 4. CRITICAL ACCOUNTING JUDGEMENTS AND


ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan) SIGNIFICANT ACCOUNTING ESTIMATES
(continued)

Sumber ketidakpastian estimasi (lanjutan) Sources of estimation uncertainty (continued)

Imbalan pascakerja Post-employment benefits

Penentuan liabilitas imbalan pascakerja tergantung The determination of the post-employment benefits
pada pemilihan asumsi tertentu yang digunakan is dependent on the selection of certain assumptions
oleh aktuaris dalam menghitung jumlah liabilitas used by actuaries in calculating such amounts.
tersebut. Asumsi tersebut termasuk antara lain Those assumptions include, among others, the
tingkat diskonto dan tingkat kenaikan gaji. Realisasi discount rate and rate of salary increase. Actual
yang berbeda dari asumsi Grup diakumulasi dan results that differ from assumptions are accumulated
diamortisasi selama periode mendatang dan and amortised over future periods and therefore,
akibatnya akan berpengaruh terhadap jumlah biaya generally affect the recognised expense and
serta liabilitas yang diakui di masa mendatang. liabilities recorded in such future periods. While it is
Walaupun asumsi Grup dianggap tepat dan wajar, believed that the assumptions are reasonable and
namun perubahan signifikan pada kenyataannya appropriate, significant differences in actual
atau perubahan signifikan dalam asumsi yang experience or significant changes in assumptions
digunakan dapat berpengaruh secara signifikan may materially affect the post-employment benefits
terhadap liabilitas imbalan pascakerja Grup. liability of the Group.

Asumsi yang digunakan untuk perhitungan liabilitas Assumptions used in the calculation of post-
imbalan pascakerja diungkapkan dalam Catatan 49. employment benefits are disclosed in Note 49.

Pajak penghasilan Income taxes

Perhitungan beban pajak penghasilan Grup The calculations of income tax expense for the
memerlukan pertimbangan dan asumsi dalam Group requires judgements and assumptions in
menentukan pengurangan beban tertentu selama determining the deductibility of certain expenses
proses pengestimasian. Semua pertimbangan dan during the estimation process. All judgements and
estimasi yang dibuat manajemen dapat estimates made by management may be challenged
dipertanyakan oleh Direktorat Jenderal Pajak. by the Directorate General of Taxation. As a result,
Sebagai akibatnya, terjadi ketidakpastian dalam the ultimate tax determination becomes uncertain.
penentuan pajak. Resolusi posisi pajak yang diambil The resolution of tax positions taken by the Group,
oleh Grup, melalui negosiasi dengan otoritas pajak through negotiations with the relevant tax authorities
yang relevan dapat berlangsung bertahun-tahun dan can take several years to complete and in some
sangat sulit untuk memprediksi hasil akhirnya. cases it is difficult to predict the ultimate outcome.
Apabila terdapat perbedaan perhitungan pajak Where the final outcome of these matters is different
dengan jumlah yang telah dicatat, perbedaan from the amounts initially recorded, such differences
tersebut akan berdampak pada pajak penghasilan will have an impact on the income tax and deferred
dan pajak tangguhan dalam tahun dimana income tax provision in the year in which this
penentuan pajak tersebut dibuat. determination is made.

Aset pajak tangguhan, termasuk yang timbul dari Deferred tax assets, including those arising from tax
rugi fiskal dan perbedaan temporer, diakui apabila losses carried forward and temporary differences,
dianggap lebih mungkin daripada tidak bahwa are recognised only where it is considered more
mereka dapat diterima kembali, dimana hal ini likely than not that they will be recovered, which is
tergantung pada kecukupan pembentukan laba kena dependent on the generation of sufficient future
pajak di masa depan. Asumsi atas pembentukan taxable profits. The assumptions about the
laba kena pajak sangat dipengaruhi oleh estimasi generation of future taxable profits are heavily
dan asumsi manajemen atas tingkat penjualan dan affected by the level of sales and the associated
biaya-biaya terkait yang terdapat risiko costs which are subject to risk and uncertainty and
ketidakpastian, sehingga ada kemungkinan hence there is a possibility that changes in
perubahan estimasi dan asumsi tersebut akan circumstances will alter the projected future taxable
mengubah proyeksi laba kena pajak di masa profits.
mendatang.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/54 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

4. PERTIMBANGAN AKUNTANSI PENTING DAN 4. CRITICAL ACCOUNTING JUDGEMENTS AND


ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan) SIGNIFICANT ACCOUNTING ESTIMATES
(continued)

Sumber ketidakpastian estimasi (lanjutan) Sources of estimation uncertainty (continued)

Sewa - estimasi suku bunga pinjaman Leases - estimation of the incremental borrowing
inkremental rate

Karena Grup tidak dapat dengan mudah Since the Group cannot readily determine the
menentukan suku bunga implisit, manajemen implicit rate, management uses the Group’s
menggunakan suku bunga pinjaman inkremental incremental borrowing rate as a discount rate. There
Grup sebagai tingkat diskonto. Ada beberapa faktor are a number factors to consider in determining an
yang perlu dipertimbangkan dalam menentukan incremental borrowing rate, many of which need
suku bunga pinjaman inkremental, yang banyak di estimation in order to be able to reliably quantify any
antaranya memerlukan estimasi untuk dapat secara necessary adjustments to arrive at the final discount
andal mengukur penyesuaian yang diperlukan untuk rates.
sampai pada tingkat diskonto akhir.

Dalam menentukan suku bunga pinjaman In determining the incremental borrowing rate, the
inkremental, Grup mempertimbangkan faktor-faktor Group considers the following main factors: the
utama berikut: risiko kredit korporat Grup, jangka Group’s corporate credit risk, the lease term, the
waktu sewa, jangka waktu pembayaran sewa, lease payment term, the economic environment, the
lingkungan ekonomi, waktu di mana sewa time at which the lease is entered into, and the
dimasukkan, dan mata uang di mana pembayaran currency in which the lease payments are
sewa ditentukan. denominated.

5. ENTITAS ANAK 5. SUBSIDIARIES


Perusahaan memiliki saham entitas anak baik The Company has ownership interests, directly or
langsung maupun tidak langsung sebagai berikut: indirectly, in the following subsidiaries:

Persentase kepemilikan/ Tahun


Percentage of operasi Jumlah aset sebelum eliminasi **)/
ownership (%) komersial/ Total assets before elimination **)
30 Juni/ 31 Desember/ Year of 30 Juni/ 31 Desember/
Entitas anak/ Domisili/ Jenis usaha/ June 30, December 31, commercial June 30, December 31,
Subsidiaries Domicile Nature of business 2023 2022 operation 2023 2022

Subholding bidang Pembangkitan/Power Generation

PT PLN Indonesia Power (“PLN IP”) Jakarta Pembangkitan tenaga listrik/ 99.99 99.99 1995 398,895 211,876
dan entitas anak/and subsidiaries Power generation

PT Cogindo Daya Bersama (“CDB”) *) Jakarta Kogenerasi , pemasok energi, 99.99 99.99 1999 1,288 1,198
jasa pelayanan dan manajemen/
Cogeneration, energy distribution,
energy service and management

PT Artha Daya Coalindo (“ADC”) *) Jakarta Perdagangan batu bara/ 80.00 80.00 1998 698 668
Coal trading

PT Indo Ridlatama Power (“IRP”) *) Kutai Pembangkitan tenaga listrik/ 90.00 90.00 2018 1,514 1,549
Power generation

PT Putra Indotenaga (“PIT”) dan Jakarta Ketenagalistrikan dan energi/ 99.99 99.99 2016 7,625 7,257
entitas anak/and its subsidiaries *) Electricity and energy

PT Indo Tenaga Hijau (“ITH”) *) Jakarta Pengembangan energi baru dan 95.81 95.45 ***) 153 92
(d/h PT Tangkuban Parahu terbarukan/Development of
Geothermal Power) new and renewable energy

PT Suralaya Indo Tenaga (“SIT”) ***) Jakarta Ketenagalistrikan dan energi/ 99.99 99.99 ***) 5,962 5,694
dan entitas anak/and its subsidiary Electricity and energy

PT Putra Suralaya Indo Tenaga (“PSI”) ***) Jakarta Ketenagalistrikan dan energi/ 99.99 99.99 ***) 5,962 5,694
Electricity and energy

PT PLN Nusantara Power (“PLN NP”) Surabaya Pembangkitan tenaga listrik/ 99.99 99.99 1995 341,663 174,960
dan entitas anak/and subsidiaries Power generation

PT PJB Services (“PJBS”) *) Surabaya Jasa/Service 99.00 98.00 2001 1,866 1,689
dan entitas anak/and subsidiaries

PT Mitra Karya Prima (“MKP”) *) Surabaya Jasa/Service 92.00 92.00 2005 183 174

PT Rekadaya Elektrika (“RE”) *) Jakarta Jasa listrik dan enjiniring/ 98.90 98.90 2004 1,821 1,943
dan entitas anak/and subsidiary Electricity and engineering

PT Prima Power Nusantara (“PPN”) Jakarta Jasa enjiniring, pengadaan 100.00 100.00 2017 199 200
dan konstruksi/ Engineering,
procurement and construction
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/55 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

5. ENTITAS ANAK (lanjutan) 5. SUBSIDIARIES (continued)

Perusahaan memiliki saham entitas anak baik The Company has ownership interests, directly or
langsung maupun tidak langsung sebagai berikut: indirectly, in the following subsidiaries: (continued)
(lanjutan)
Persentase kepemilikan/ Tahun
Percentage of operasi Jumlah aset sebelum eliminasi **)/
ownership (%) komersial/ Total assets before elimination **)
30 Juni/ 31 Desember/ Year of 30 Juni/ 31 Desember/
Entitas anak/ Domisili/ Jenis usaha/ June 30, December 31, commercial June 30, December 31,
Subsidiaries Domicile Nature of business 2023 2022 operation 2023 2022
PT Navigat Innovative Indonesia (“NII”) *) Palembang Perdagangan, konstruksi, 72.97 72.97 2002 474 485
pertambangan dan pertanian/
Trading, construction,
mining and agriculture
PT Pembangkitan Jawa-Bali
Investasi (“PJBI”) *) Jakarta Investasi/ 99.99 99.99 2015 8,417 8,010
Investment

PT Pembangkitan Jawa-Bali
Investindo (“PJB Investindo”) *) Jakarta Investasi/ 99.99 99.99 2020 260 194
Investment

PT Pembangkitan Jawa Baskara


Investasi Cirata (“PJBIC”) Jakarta Investasi/ 99.99 99.99 2020 258 194
Investment

PT Prima Layanan Niaga Jakarta Perdagangan barang dan jasa 100.00 100.00 2018 648 471
Suku Cadang (“PLN SC”) *) enjiiring supply chain dan konsultasi
dibidang ketenagalistrikan/
Operation and services trading,
engineering supply chain and
consultation in the electricity sector

Subholding bidang penyediaan dan logistik energi primer/


the primary energy procurement and logistics sector

PT PLN Energi Primer Indonesia Jakarta Perdagangan batu bara/ 99.99 99.99 2009 14,352 5,604
(“PLN EPI”) dan entitas anak/ Coal trading
and subsidiaries

PT Jambi Prima Coal (“JPC”) Jambi Pertambangan batu bara/ 60.00 60.00 2010 255 286
Coal mining

PT PLN Batubara Niaga (“BBN”) Jakarta Perdagangan batu bara/ 100.00 100.00 ***) 2,211 183
Coal trading

PT PLN Batubara Investasi (“BBI”) Jakarta Investasi/ 99.96 99.96 2018 2,013 2,024
dan entitas anak/and subsidiaries Investment

PT Bangun Persada Jambi Energi Jambi Pertambangan batu bara/ 80.00 80.00 ***) 37 51
(“BPJE”)*) Coal mining

PT Mahakarya Abadi Prima (“MAP”)*) Jambi Pertambangan batu bara/ 80.00 80.00 ***) 3 5
Coal mining

PT Bayan Koalindo Lestari *) (“BKL”) Palembang Pertambangan batu bara/ 51.00 51.00 2018 706 574
Coal mining

PT Prima Bara Indonesia *) (“PBI”) Kalimantan Pertambangan batu bara/ 51.00 51.00 ***) 187 139
Tengah/ Coal mining
Central
Kalimantan

PT Pengembang Listrik Nasional Jakarta Pembangkitan tenaga listrik/ 99.99 99.99 2010 2,503 2,765
Gas Dan Geothermal Power generation
(“PLN Gas & Geothermal”)

PT Pelayaran Bahtera Adhiguna (“BAG”) Jakarta Pelayaran/ Shipping 99.99 99.99 2011 4,885 4,508

Subholding Beyond kWh

PT PLN ICON Plus (“PLN ICON+”)****) Jakarta Jasa penyedia jaringan 99.99 99.99 2000 8,374 6,955
(dahulu PT Indonesia Comnets Plus telekomunikasi/Telecommunication
(“ICON”)) provider

Entitas Anak Lainnya / Other Subsidiaries

PT Pelayanan Listrik Nasional Batam Batam Penyedia tenaga listrik/ 99.99 99.99 2000 20,352 19,978
(“PLN Batam”) dan entitas anak/ Electricity supplier
and subsidiary

PT Pelayanan Energi Batam (“PEB”) Batam Pembangunan pipa gas dan 99.99 99.99 2016 1,050 987
energi lainnya/
Construction of gas pipeline and
other energy sector

PT Prima Layanan Nasional Enjiniring Jakarta Jasa enjiniring, pengadaan 99.90 99.90 2003 1,168 1,167
(“PLNE”) dan entitas anak/ dan konstruksi (“EPC”)/
and subsidiary Engineering, procurement and
construction (“EPC”)

PT Rekadaya Elektrika Consult (“REC”) Jakarta Supervisi dan konsultasi/ 99.80 99.80 2010 115 121
Supervision and consultation,
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/56 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

5. ENTITAS ANAK (lanjutan) 5. SUBSIDIARIES (continued)

Perusahaan memiliki saham entitas anak baik The Company has ownership interests, directly or
langsung maupun tidak langsung sebagai berikut: indirectly, in the following subsidiaries: (continued)
(lanjutan)

Persentase kepemilikan/ Tahun


Percentage of operasi Jumlah aset sebelum eliminasi **)/
ownership (%) komersial/ Total assets before elimination **)
30 Juni/ 31 Desember/ Year of 30 Juni/ 31 Desember/
Entitas anak/ Domisili/ Jenis usaha/ June 30, December 31, commercial June 30, December 31,
Subsidiaries Domicile Nature of business 2023 2022 operation 2023 2022

PT Pelayanan Listrik Nasional Tarakan Jasa pemeliharaan dan operasi/ 99.97 99.97 2004 1,053 817
Tarakan (“PLN Tarakan”) Maintenance and operation
dan entitas anak/and subsidiary

PT Paguntaka Cahaya Nusantara Balikpapan Jasa pemeliharaan dan operasi/ 99.96 99.96 2018 122 112
(“PCN”) *) Maintenance and operation

Majapahit Holding B.V. (“MH”) Belanda/ Lembaga keuangan/ 100.00 100.00 2006 5,553 5,752
dan entitas anak/and subsidiary The Netherlands Financial institution

Majapahit Finance B.V. (“MF”) *) Belanda/ Lembaga keuangan/ 100.00 100.00 2006 12,795 12,795
The Netherlands Financial institution

PT Haleyora Power (“HP”) Jakarta Jasa pemeliharaan dan operasi/ 99.99 99.99 2013 1,424 1,356
dan entitas anak/and subsidiary Maintenance and operation

PT Haleyora Powerindo (“HPI”) *) Jakarta Jasa/Service 95.00 95.00 2013 553 553

PT Energy Management Indonesia (“EMI”) Jakarta Jasa konservasi energi dan 99.99 99.99 1987 94 41
dan entitas anak/and subsidiary lingkungan serta energi baru
terbarukan/Energy and
environmental conservation
service and new renewable energy

PT Energi Biomasa Indonesia (“EBI”) Jakarta Jasa konservasi energi dan 99.00 99.00 2015 4 3
lingkungan serta energi baru
terbarukan/Energy and
environmental conservation
service and new renewable energy

PT Energi Bangun Indonesia (“EBI 2”) ***) Jakarta Jasa perdagangan ekspor dan 99.99 99.99 ***) 1 -
impor, perindustrian, pembangunan/
Export and import trading, industry
construction

PT Mandau Cipta Tenaga Nusantara Jakarta Jasa pengelolaan energi/Energy 95.00 95.00 2000 1,212 1,322
(*MCTN”) services

*) Pemilikan tidak langsung/Indirect ownership


**) Dalam miliaran Rupiah/Stated in billions of Rupiah
***) Dalam tahap pengembangan/Under development stage

Berdasarkan Akta Notaris No. 38 tanggal 27 April Based on Notarial Deed No. 38 dated 27 April 2022
2022 dari Lenny Janis Ishak, S.H., Notaris di of Lenny Janis Ishak, S.H., Notary in Jakarta, PLN
Jakarta, PLN NP mengadakan perjanjian jual beli NP entered into a share sale and purchase
saham untuk membeli saham PJBS dari YK PJB, agreement to purchase shares of PJBS of YK PJB,
dimana Perusahaan membeli sebagian kepemilikan under which the Company purchased a part of
saham PJBS atau setara dengan 1% kepemilikan shares or equivalent to 1% ownership of PJBS with
atas PJBS dengan nilai pengalihan sebesar a total transaction value of Rp11,184.
Rp11.184.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/57 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP 6. PROPERTY, PLANT AND EQUIPMENT


30 Juni/ June 30, 2023
Saldo awal/ Saldo akhir/
Beginning Penambahan/ Pengurangan/ Reklasifikasi/ Ending
balance Additions Disposals Reclassifications balance

Biaya perolehan At cost


Pemilikan langsung Direct acquisitions
Tanah dan hak atas tanah 165,722,533 3,586 - 1,042,630 166,768,749 Land and land rights
Bangunan umum, waduk Buildings, reservoirs and
dan prasarana 80,241,862 18,426,832 - (17,482,437) 81,186,257 infrastructure
Instalasi dan mesin Installations and power
pembangkit 576,903,905 161,634,972 - (154,171,522) 584,367,355 plants
Perlengkapan transmisi 242,370,927 2,286 - 2,965,572 245,338,785 Transmission equipment
Perlengkapan distribusi 248,760,910 54,517 - 5,205,930 254,021,357 Distribution equipment
Perlengkapan umum 20,255,166 3,900,950 - (3,429,469) 20,726,647 General equipment
Kendaraan bermotor 2,862,730 371,499 - (2,402,981) 831,248 Motor vehicles
Material cadangan utama 3,194,857 220,922 - (64,003) 3,351,776 Major spare parts
Perlengkapan Telecommunications
pengolahan data dan and data
telekomunikasi yang processing equipment
digunakan dalam used for
penyediaan listrik 7,274,300 79,138 - 6,166,356 13,519,794 electricity supply
Perlengkapan pengolahan data Other telecommunications and
dan telekomunikasi lainnya 5,795,912 461 - (4,797,420) 998,953 data processing equipment
Kapal dan perlengkapan 1,912,780 249,377 - - 2,162,157 Vessels and equipment

Subjumlah 1,355,295,882 184,944,540 - (166,967,344) 1,373,273,078 Subtotal

Aset dalam pembangunan 135,756,414 21,483,620 - (17,881,594) 139,358,440 Construction in progress

Aset tidak digunakan Assets not used


dalam operasi 19,283,887 - (206) 385,478 19,669,159 in operations

Jumlah 1,510,336,184 206,428,160 (206) (184,463,461) 1,532,300,677 Total

Akumulasi penyusutan Accumulated depreciation


dan penurunan nilai and impairment
Pemilikan langsung Direct acquisitions
Bangunan umum, waduk Buildings, reservoirs and
dan prasarana 2,703,562 1,316,027 - 16,180 4,035,769 infrastructure
Instalasi dan mesin Installations and power
pembangkit 19,968,790 9,709,064 - 1,003,130 30,680,984 plants
Perlengkapan transmisi 6,298,086 3,406,484 - 218,446 9,923,016 Transmission equipment
Perlengkapan distribusi 9,470,612 4,941,188 - (36,631) 14,375,169 Distribution equipment
Perlengkapan umum 17,033,001 789,251 - (12,202) 17,810,050 General equipment
Kendaraan bermotor 2,313,026 48,718 - (948,412) 1,413,332 Motor vehicles
Material cadangan utama 97,143 50,498 - (1,344) 146,297 Major spare parts
Perlengkapan Telecommunications
pengolahan data dan and data
telekomunikasi yang processing equipment
digunakan dalam used for
penyediaan listrik 1,127,653 553,648 - 2,971,004 4,652,305 electricity supply
Perlengkapan pengolahan data Other telecommunications and
dan telekomunikasi lainnya 2,978,984 343,429 - (2,969,868) 352,545 data processing equipment
Kapal dan perlengkapan 948,992 86,912 - (7,370) 1,028,534 Vessels and equipment

Subjumlah 62,939,849 21,245,219 - 232,933 84,418,001 Subtotal

Aset tidak digunakan Assets not used


dalam operasi 10,594,605 166,687 (393,508) 122,467 10,490,251 in operations

Jumlah 73,534,454 21,411,906 (393,508) 355,400 94,908,252 Total

Penyisihan penurunan nilai 3,752,747 - - (32,381) 3,720,366 Provision for impairment

Jumlah tercatat 1,433,048,983 1,433,672,059 Net carrying value


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/58 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan) 6. PROPERTY, PLANT AND EQUIPMENT (continued)

31 Desember/ December 31, 2022


Saldo awal/ Saldo akhir/
Beginning Penambahan/ Pengurangan/ Reklasifikasi/ Ending
balance Additions Disposals Reclassifications balance

Biaya perolehan At cost


Pemilikan langsung Direct acquisitions
Tanah dan hak atas tanah 163,835,912 44,862 - 1,841,759 165,722,533 Land and land rights
Bangunan umum, waduk Buildings, reservoirs and
dan prasarana 76,580,417 305,415 - 3,356,030 80,241,862 infrastructure
Instalasi dan mesin Installations and power
pembangkit 557,335,600 523,387 - 19,044,918 576,903,905 plants
Perlengkapan transmisi 205,592,452 22,459 - 36,756,016 242,370,927 Transmission equipment
Perlengkapan distribusi 235,041,034 201,001 - 13,518,875 248,760,910 Distribution equipment
Perlengkapan umum 19,538,455 284,577 - 432,134 20,255,166 General equipment
Kendaraan bermotor 2,740,665 23,332 - 98,733 2,862,730 Motor vehicles
Material cadangan utama 3,095,028 110,524 - (10,695) 3,194,857 Major spare parts
Perlengkapan Telecommunications
pengolahan data dan and data
telekomunikasi yang processing equipment
digunakan dalam used for
penyediaan listrik 6,198,821 21,439 - 1,054,040 7,274,300 electricity supply
Perlengkapan pengolahan data Other telecommunications and
dan telekomunikasi lainnya 4,206,352 4,420 - 1,585,140 5,795,912 data processing equipment
Kapal dan perlengkapan 1,691,216 240,374 - (18,810) 1,912,780 Vessels and equipment

Subjumlah 1,275,855,952 1,781,790 - 77,658,140 1,355,295,882 Subtotal

Aset dalam pembangunan 167,052,758 46,527,258 - (77,823,601) 135,756,415 Construction in progress

Aset tidak digunakan Assets not used


dalam operasi 20,658,820 - (2,652,091) 1,277,158 19,283,887 in operations

Jumlah 1,463,567,530 48,309,048 (2,652,091) 1,111,697 1,510,336,184 Total

Akumulasi penyusutan Accumulated depreciation


dan penurunan nilai and impairment
Pemilikan langsung Direct acquisitions
Bangunan umum, waduk Buildings, reservoirs and
dan prasarana - 2,543,184 - 160,378 2,703,562 infrastructure
Instalasi dan mesin Installations and power
pembangkit - 19,044,450 - 924,340 19,968,790 plants
Perlengkapan transmisi - 6,261,538 - 36,548 6,298,086 Transmission equipment
Perlengkapan distribusi - 9,466,781 - 3,831 9,470,612 Distribution equipment
Perlengkapan umum 16,106,443 1,650,412 - (723,854) 17,033,001 General equipment
Kendaraan bermotor 2,046,087 290,207 - (23,268) 2,313,026 Motor vehicles
Material cadangan utama - 100,271 - (3,128) 97,143 Major spare parts
Perlengkapan Telecommunications
pengolahan data dan and data
telekomunikasi yang processing equipment
digunakan dalam used for
penyediaan listrik - 1,114,302 - 13,351 1,127,653 electricity supply
Perlengkapan pengolahan data Other telecommunications and
dan telekomunikasi lainnya 2,490,772 493,376 - (5,164) 2,978,984 data processing equipment
Kapal dan perlengkapan 806,536 135,087 - 7,369 948,992 Vessels and equipment

Subjumlah 21,449,838 41,099,608 - 390,403 62,939,849 Subtotal

Aset tidak digunakan Assets not used


dalam operasi 12,342,577 689,003 (2,630,925) 193,950 10,594,605 in operations

Jumlah 33,792,415 41,788,611 (2,630,925) 584,353 73,534,454 Total

Penyisihan penurunan nilai 2,716,757 1,035,990 - - 3,752,747 Provision for impairment

Jumlah tercatat 1,427,058,358 1,433,048,983 Net carrying value


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/59 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan) 6. PROPERTY, PLANT AND EQUIPMENT (continued)

Beban penyusutan dialokasikan sebagai berikut: Depreciation expense was allocated as follows:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Beban usaha 21,223,269 19,467,134 Operating expenses


Aset dalam pembangunan 21,951 50,435 Construction in progress
Beban lain-lain 166,687 91,053 Other expenses

Jumlah 21,411,907 19,608,622 Total

Grup memiliki beberapa bidang tanah dengan hak The Group owns several pieces of land with Rights
legal berupa Hak Pakai dan Hak Guna Bangunan to Use and Building Use Rights (“HGB”). Rights to
(“HGB”). Hak Pakai tidak mempunyai jangka waktu Use have no expiration date while HGB will expire
sedangkan HGB Perusahaan jatuh tempo antara from 2023 to 2051, but they are renewable by the
tahun 2023 sampai dengan 2051, tetapi dapat Group. The Group also has several pieces of land
diperpanjang oleh Grup. Grup juga mempunyai and land rights, which are still in an extension
beberapa bidang tanah yang sedang dalam proses process and in the process of transfer of certificates
perpanjangan HGB dan pengurusan balik nama to the name of the Group.
menjadi atas nama Grup.

Pada tanggal 30 Juni 2023, bangunan, instalasi dan As at June 30, 2023, the buildings, installations and
mesin pembangkit, perlengkapan transmisi, power plants, transmission equipment, other
perlengkapan pengolahan data dan telekomunikasi telecommunications and data processing equipment
lainnya serta kapal diasuransikan kepada beberapa and vessels were insured with several insurance
perusahaan asuransi antara lain PT Asuransi companies, including PT Asuransi Central Asia and
Central Asia dan lainnya, dengan jumlah nilai others, for a total insurance coverage of
pertanggungan sebesar USD23.086.965.524 (nilai USD23,086,965,524 (full amount) or equivalent to
penuh) atau setara dengan Rp346.304.482 dan Rp346,304,482 and Rp146,388,750 (2022:
Rp146.388.750 (2022: USD24.292.883.042 (nilai USD24.292.883.042 (full amount) or equivalent to
penuh) atau setara dengan Rp378.774.632 dan Rp378.774.632 and Rp4,264,973). The Group does
Rp4.264.973). Grup tidak mengasuransikan aset not insure property, plant and equipment other than
tetap selain bangunan, instalasi dan mesin buildings, installations and power plants,
pembangkit, perlengkapan transmisi, perlengkapan transmission equipment, other telecommunications
pengolahan data dan telekomunikasi lainnya serta and data processing equipment and vessels.
kapal. Manajemen berpendapat bahwa risiko Management believes that the risks of losses related
kerugian yang berkaitan dengan aset yang tidak to the uninsured assets can be managed by the
diasuransikan tersebut dapat dikelola oleh Grup Group in consideration of the costs that would be
sehubungan dengan pertimbangan biaya yang akan spent and the benefits that would be obtained.
dikeluarkan dan manfaat yang akan diperoleh. Management believes that the insurance coverage is
Manajemen berpendapat bahwa nilai pertanggungan adequate to cover possible losses on the assets
tersebut cukup untuk menutup kemungkinan insured.
kerugian atas aset yang dipertanggungkan.

Jumlah tercatat dari aset tetap yang telah disusutkan The carrying amount of property, plant and
penuh dan masih digunakan pada tanggal equipment that has been fully depreciated but is still
30 Juni 2023 dan 31 Desember 2022 masing- in use as at June 30, 2023 and December 31, 2022
masing sebesar Rp13.810.233 dan Rp14.081.063. amounted to Rp13,810,233 and Rp14,081,063
respectively.

Pada tahun 2021, manajemen mempekerjakan In 2021, management engaged external


penilai eksternal independen dan berkualifikasi independent and qualified valuers, KJPP RHR to
untuk menentukan nilai wajar aset tetap yaitu KJPP determine the fair value of fixed assets, based on its
RHR, berdasarkan laporannya No. 00142/2.0012- report No. 00142/2.0012-00/PI/02/0006/1/IV/2022,
00/PI/02/0006/1/IV/2022, tertanggal 26 April 2022. dated April 26, 2022. KJPP RHR is an independent
KJPP RHR merupakan penilai independen yang valuer registered with the Ministry of Finance and
telah terdaftar di Kementerian Keuangan dan OJK. FSA.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/60 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan) 6. PROPERTY, PLANT AND EQUIPMENT (continued)

Manajemen tidak mengidentifikasi adanya Management did not identify any significant changes
perubahan signifikan yang mengharuskan in circumstances which would require a revaluation
dilakukannya revaluasi untuk tahun 2023. exercise to be performed for 2023.

Tabel di bawah ini menganalisis aset tetap yang The table below analyses fixed assets recorded at
dicatat pada nilai wajar berdasarkan hierarki nilai fair value, based on the fair value hierarchy in SFAS
wajar sesuai dengan PSAK No. 68 dan berdasarkan No. 68 and based on valuation as at December 31,
valuasi pada tanggal 31 Desember 2021 sebagai 2021 as follows:
berikut:
Tingkat pengukuran nilai wajar 31 Desember 2021 menggunakan/
Fair value measurement at December 31, 2021 using
Level 1/ Level 2/ Level 3/ Jumlah/
Level 1 Level 2 Level 3 Total
Pengukuran nilai wajar Recurring fair value
berulang measurement
Tanah dan hak atas tanah - 36,735,664 126,806,369 163,542,033 Land and land rights
Bangunan umum, waduk Buildings, reservoirs and
dan prasarana - 6,988,067 69,138,909 76,126,976 infrastructure
Instalasi dan mesin Installations and power
pembangkit - - 556,182,532 556,182,532 plants
Perlengkapan transmisi - - 204,873,601 204,873,601 Transmission equipment
Perlengkapan distribusi - - 235,012,113 235,012,113 Distribution equipment
Perlengkapan pengolahan
data dan telekomunikasi data Telecommunications and
yang digunakan dalam processing equipment
penyediaan listrik - - 6,134,499 6,134,499 used for electricity supply
Material cadang utama - - 3,090,753 3,090,753 Major spare parts

Jumlah - 43,723,731 1,201,238,776 1,244,962,507 Total

- Harga dikutip (tidak disesuaikan) dari pasar - Quoted prices (unadjusted) in active markets for
yang aktif untuk aset atau liabilitas yang identik identical assets or liabilities (Level 1);
(Tingkat 1);
- Input selain harga yang dikutip dari pasar yang - Inputs other than quoted prices included within
disertakan pada tingkat 1 yang dapat Level 1 that are observable for the asset or
diobservasi untuk aset dan liabilitas, baik liability, either directly (that is, as prices) or
secara langsung (yaitu sebagai sebuah harga) indirectly (that is, derived from prices) (Level 2);
atau secara tidak langsung (yaitu sebagai and
turunan dari harga) (Tingkat 2); dan
- Input untuk aset atau liabilitas yang tidak - Inputs for the asset or liability that are not based
didasarkan pada data pasar yang dapat on observable market data (that is,
diobservasi (informasi yang tidak dapat unobservable inputs) (Level 3).
diobservasi) (Tingkat 3).

Tidak terdapat aset tetap yang bisa digolongkan ke There were no fixed assets which could be classified
dalam nilai wajar Tingkat 1. at Level 1 fair value.

Tidak terdapat transfer antara Tingkat 1 dan Tingkat There were no transfers between Level 1 and Level
2 selama tahun berjalan. 2 during the year.

Nilai wajar Tingkat 2 dari tanah dan hak atas tanah The Level 2 fair value of land and land rights is
dihitung dengan menggunakan pendekatan pasar calculated using the market approach and income
dan pendekatan pendapatan, sedangkan untuk approach, while the value of building is calculated
bangunan menggunakan pendekatan biaya. Input using the cost approach. Data inputs were obtained
yang diperoleh dari pendekatan pasar yaitu: from the market approach that consists of the
following:
a. Harga jual atau harga sewa per meter persegi; a. Sale or rental price per square metre;
b. Tingkat hunian; b. Occupancy rate;
c. Tingkat pertumbuhan; c. Growth rate;
d. Tingkat diskonto dan kapitalisasi; d. Discount and capitalisation rate;
e. Biaya pembuatan baru per meter persegi; e. Replacement cost new per square metre;
f. Tingkat depresiasi; f. Depreciation rate;
g. Biaya operasional; g. Operational expense;
h. Keuntungan pengembangan; dan h. Developers margin; and
i. Indeks kemahalan konstruksi. i. Construction cost index.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/61 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan) 6. PROPERTY, PLANT AND EQUIPMENT (continued)

Rekonsiliasi atas saldo awal terhadap saldo akhir Reconciliation of the beginning balances to the closing
dari pengukuran nilai wajar dengan menggunakan balances of the fair value measurements using
informasi signifikan yang tidak dapat diobservasi significant unobservable inputs (Level 3) is as follows:
(Tingkat 3) adalah sebagai berikut:
Jumlah yang
diakui pada
Jumlah yang diakui pada penghasilan
laba rugi/ komprehensif
Amount recognised in lain/Amount
profit or loss recognised
1 Januari/ Penurunan in other 31 Desember/
January Penambahan/ Reklasifikasi/ Depresiasi/ nilai/ comprehensive December
2021 Additions Reclassification Depreciation Impairment income 2021

Tanah 120,748,069 90 344,881 - (233,550) 5,946,879 126,806,369 Land


Bangunan umum, Building, reservoirs
waduk dan prasarana 68,575,318 11,935 1,396,506 (2,075,199) (326,876) 1,557,225 69,138,909 and infrastructures
Instalasi dan Installations
mesin pembangkit 569,627,746 1,307,825 9,073,213 (18,644,822) (1,098,687) (4,082,743) 556,182,532 and power plants
Perlengkapan transmisi 186,216,183 86,471 17,752,609 (5,481,988) (688,075) 6,988,401 204,873,601 Transmissions equipment
Perlengkapan distribusi 222,243,033 93,123 12,051,446 (8,336,371) (21,800) 8,982,682 235,012,113 Distributions equipment
Perlengkapan
pengolahan data Telecommunications
dan telekomunikasi and data processing
yang digunakan dalam equipment used for
penyediaan listrik 5,997,253 20,142 711,983 (960,551) (58,427) 424,099 6,134,499 electricity supply
Material cadangan utama 4,063,814 29,766 (1,137,411) (96,006) (4,179) 234,769 3,090,753 Major spare parts

Jumlah 1,177,471,416 1,549,352 40,193,227 (35,594,937) (2,431,594) 20,051,312 1,201,238,776 Total

Nilai wajar Tingkat 3 dihitung dengan menerapkan The Level 3 fair value is calculated through the market
pendekatan pasar, pendekatan pendapatan dan approach, income approach, and cost approach by
pendekatan biaya dengan menggunakan input yang using unobservable inputs.
tidak dapat diobservasi.

Perubahan surplus revaluasi, dikurangi dengan The changes in revaluation surplus, net of final income
penghasilan final dan penghasilan pajak tangguhan tax and applicable deferred income taxes, were
yang terkait, yang dibebankan pada penghasilan charged to other comprehensive income and are
komprehensif lain dan disajikan sebagai surplus presented in property, plant, and equipment
revaluasi aset tetap dalam laporan perubahan ekuitas revaluations surplus in the consolidated statements of
konsolidasian. changes in equity.

Tidak terdapat perbedaan yang signifikan antara nilai There is no significant difference between the fair
wajar aset tetap dengan nilai tercatatnya selain aset value and carrying value of fixed assets other than
yang menggunakan model revaluasi. assets that have applied the revaluation model.

Mutasi surplus revaluasi aset tetap adalah sebagai The movements of property, plant and equipment
berikut: revaluation surplus are as follows:

30 Juni/ 31 Desember/
June 30 December 31
2023 2022

Saldo awal 688,538,705 688,912,786 Beginning balance

Kenaikan surplus revaluasi - 925,253 Increase on revaluation surplus


Penghapusan aset tetap (83,977) (512,731) Disposals of property, plant and equipment

(83,977) 412,522
Reklasifikasi surplus revaluasi Reclassification of revaluation surplus
ke saldo laba atas aset tetap to retained earnings from disposals
yang telah dijual - (695,848) of property, plant and equipment
Beban pajak terkait 18,475 (90,755) Related income tax expense

Saldo akhir 688,473,203 688,538,705 Ending balance


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/62 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan) 6. PROPERTY, PLANT AND EQUIPMENT (continued)


Selain menggunakan input yang berasal dari pasar, Other than the data inputs observed from the market,
KJPP RHR juga menggunakan input yang tidak KJPP RHR also used unobservable market data
dapat diobservasi dari pasar dan menggunakan inputs and used special assumptions related to the
asumsi khusus terkait dengan jenis aset yang assets classified as specialised property, such as
tergolong sebagai properti khusus, seperti power plants and others.
pembangkit listrik, dan lainnya.
Penyesuaian dilakukan berdasarkan ukuran, Adjustments were made based on size, capacity, age,
kapasitas, usia, lokasi, bentuk dan spesifikasi, hak location, shapes and specifications, land rights and
atas tanah, dan elemen perbandingan lainnya. other comparison elements.
Informasi mengenai pengukuran nilai wajar yang Information about fair value measurements using
menggunakan informasi signifikan yang tidak dapat significant unobservable inputs (Level 3) are as
diobservasi (Tingkat 3) adalah sebagai berikut: follows:
Kisaran input
yang tidak
Nilai wajar dapat Hubungan
pada tanggal Informasi diobservasi informasi yang tidak
31 Desember yang tidak yang dipakai/ dapat diobservasi
2021/ Teknik dapat Range of terhadap nilai wajar/
Fair value as at penilaian/ diobservasi/ unobservable Relationship of
31 December Valuation Unobservable inputs unobservable
2021 technique inputs used inputs to fair value
Tanah Land
Tapak Tower 51,471,076 Pendekatan biaya - Luas Right of Way (“ROW”)/ 60.00% - 70.00%* - Semakin tinggi luas dan Land for tower site
dengan metode ROW area kompensasi ROW
penjumlahan/ maka semakin
The cost approach tinggi nilai wajar/
With the summation The higher the ROW area
method and compensation
the higher the fair value
- Kompensasi ROW/
Compensation ROW
Tanah gardu dan pembangkit 75,335,293 Pendekatan pendapatan - Peruntukan sesuai 60.00% - 80.00%* - Semakin tinggi koefisien Land for substation
dengan metode pengembangan/ luas bangunan (“KLB”) and power plant
pengembangan lahan/ Adjustment of parameter maka semakin
The income approach development tinggi nilai wajar/
with the land The higher the KLB,
development method the higher the fair value
- Data luas dan aspek legal/ - Tanah bersertifikat akan
Land area and legal memiliki nilai wajar
aspects lebih tinggi/
Certified land will have
higher fair value
- Perubahan peruntukan/ - Peruntukan tanah sekitar
Zoning changes mengindikasikan nilai wajar
yang lebih tinggi/
Zoning of neighboring land
might have higher fair value
Bangunan Buildings
Bangunan umum 52,306,552 Pendekatan biaya/ - Indeks koefisien/ 0.45 - 5.46 - Semakin besar General buildings
Cost approach Index coefficient indeks koefisien maka
semakin tinggi nilai wajar/
The higher the index coefficient,
the higher the fair value
- Volume bangunan/ 60.00% - 70.00%* - Semakin besar volume
Building volumes maka semakin tinggi
nilai wajar/
The higher building
volumes, the higher the fair value
Waduk dan prasarana 16,832,357 Tren/ - Indeks koefisien/ 1.00 - 2.27 - Semakin besar tingkat Reservoirs and infrastructures
Trending Index coefficient indeks maka semakin
tinggi nilai wajar/
The higher the index coefficient,
the higher the fair value

Instalasi dan mesin 556,182,532 Pendekatan biaya/ - Tingkat kemunduran 1.00% - 30.00% - Semakin besar tingkatnya, Installations and
pembangkit Cost approach fungsional/ maka semakin power plants
Functional rendah nilai wajar/
obsolescence rate The higher the rate,
the lower the fair value
- Tingkat kemunduran 1.00% - 3.00% - Semakin besar tingkatnya,
ekonomis/ maka semakin
Economic rendah nilai wajar/
obsolescence rate The higher the rate,
the lower the fair value
- Tingkat indeks PPI/ 1.00 - 2.00 - Semakin besar tingkat
PPI index rate indeks PPI maka semakin
tinggi nilai wajar/
The higher the PPI index rate,
the higher the fair value
Perlengkapan transmisi 204,873,601 Pendekatan biaya/ - Tingkat indeks PPI/ 1.00 - 3.00 - Semakin besar tingkat Transmissions equipment
Cost approach PPI index rate indeks PPI maka semakin
tinggi nilai wajar/
The higher the PPI index rate,
the higher the fair value

Perlengkapan distribusi 235,012,113 Pendekatan biaya/ - Tingkat indeks PPI/ 1.00 - 1.65 - Semakin besar tingkat Distributions equipment
Cost approach PPI index rate indeks PPI maka semakin
tinggi nilai wajar/
The higher the PPI index rate,
the higher the fair value
Perlengkapan pengolahan 6,134,499 Pendekatan biaya/ - Tingkat indeks PPI/ 1.01 - 1.02 - Semakin besar tingkat Telecommunications
data dan telekomunikasi Cost approach PPI index rate indeks PPI maka semakin and data processing
yang digunakan dalam tinggi nilai wajar/ equipment used for
penyediaan listrik The higher the PPI index rate, electricity supply
the higher the fair value
Material cadang utama 3,090,753 Pendekatan biaya/ - Tingkat indeks PPI/ 1.00 - 3.00 - Semakin besar tingkat Major spare parts
Cost approach PPI index rate indeks PPI maka semakin
tinggi nilai wajar/
The higher the PPI index rate,
the higher fair value

*) Terdapat banyak input yang tidak dapat diobservasi. Hal ini merepresentasikan kisaran bobot dari input yang tidak dapat diobservasi./There are too many unobservable inputs. This represents the weights of the
unobservable inputs.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/63 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan) 6. PROPERTY, PLANT AND EQUIPMENT (continued)

Surplus revaluasi, dikurangi dengan penghasilan The revaluation surplus, net of applicable deferred
pajak tangguhan yang terkait, telah dikreditkan pada income taxes, was credited to other comprehensive
pendapatan komprehensif lain dan disajikan sebagai income and is shown in “property, plant and
“surplus revaluasi aset tetap” pada laba equipment revaluation surplus” in other
komprehensif lain. comprehensive income.

Jika Grup tidak menerapkan model revaluasi, nilai If the Group did not apply the revaluation model, the
tercatat bersih aset tetap Perusahaan pada tanggal net carrying value of property, plant and equipment as
30 Juni 2023 dan 31 Desember 2022 masing- at June 30, 2023 and December 31, 2022 would have
masing sebesar Rp643.562.366 dan amounted to Rp643,562,366 and Rp641,928,399,
Rp641.928.399. respectively.

Aset dalam pembangunan Construction in progress

Akun ini merupakan biaya-biaya yang terjadi This account represents costs incurred in relation to
sehubungan dengan pembangunan dan renovasi/ the construction and renovation/betterment of power
perbaikan sarana kelistrikan, sebagai berikut: supply facilities, as follows:

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Proyek penugasan - program percepatan: Mandatory project - fast track program:


Pembangkitan 4,529,779 5,092,385 Power plants
Transmisi 5,108,398 5,398,032 Transmission

Subjumlah 9,638,177 10,490,417 Subtotal

Konstruksi rutin: Regular construction:


Pembangkitan 64,322,730 63,427,712 Power plants
Transmisi 53,911,294 52,904,758 Transmission
Distribusi 10,411,898 8,040,177 Distribution
Perlengkapan 1,074,341 893,351 Equipment

Subjumlah 129,720,263 125,265,998 Subtotal

Jumlah 139,358,440 135,756,415 Total

(i) Program percepatan (i) Fast track program

Program percepatan (fast track program) The fast track program represents projects which
merupakan proyek yang ditugaskan Pemerintah are mandated by the Government to the Group.
kepada Grup. Aset dalam pembangunan untuk Construction in progress under the fast track
program percepatan termasuk pembayaran program includes advance payments made to the
uang muka kepada kontraktor, biaya pinjaman contractors, borrowing costs and other capitalised
serta pengeluaran lain yang dikapitalisasi. expenditures.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/64 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan) 6. PROPERTY, PLANT AND EQUIPMENT (continued)

Aset dalam pembangunan (lanjutan) Construction in progress (continued)

(i) Program percepatan (lanjutan) (i) Fast track program (continued)

Pembangkitan Power plants

Program percepatan aset dalam pembangunan The fast track program of power plants under
pembangkitan terutama merupakan PLTU 1 construction consists mainly of PLTU 1 West
Kalimantan Barat - Parit Baru 2x50 MW dan Kalimantan - Parit Baru 2x50 MW and PLTU 2
PLTU 2 Kalimantan Barat Bengkayang 2x27,5 West Kalimantan Bengkayang 2x27.5 MW.
MW.

Transmisi Transmission

Program percepatan aset dalam pembangunan The fast track program of transmission and
transmisi dan gardu induk antara lain proyek substation under construction mainly consists of
Gardu Induk Tegangan Ekstra Tinggi 500 kV project Extra High Voltage Substations 500 kV
New Rawalo (Kesugihan) dan SUTT 150 kV New Rawalo (Kesugihan) and Overhead
Blang Pidie – Tapak Tuan. powerline 150 kV Blang Pidie – Tapak Tuan.

(ii) Konstruksi rutin (ii) Regular construction

Pembangkitan Power plants

Aset dalam pembangunan untuk pembangkitan Power plants under construction consist mainly of
terutama merupakan PLTU Lontar Extension PLTU Lontar Extension 1x315 MW, PLTU
1x315 MW, PLTU Kalselteng 2 2x100 MW dan Kalselteng 2 2x100 MW and PLTA Peusangan
PLTA Peusangan 2x88 MW. 2x88 MW.

Transmisi Transmission

Aset dalam pembangunan transmisi terutama Transmission under construction consists mainly
merupakan proyek jaringan transmisi 500 kV of projects of transmission lines of 500 kV in
untuk Sumatera, Jawa - Bali, 150 kV untuk luar Sumatera, Java - Bali, 150 kV outside Sumatera,
Sumatera, Jawa - Bali, proyek gardu induk 150 Java - Bali, substations of 150 kV and
kV serta proyek interkoneksi jaringan. interconnection of transmission projects.

Distribusi Distribution

Aset dalam pembangunan distribusi terutama Distribution under construction consists mainly of
merupakan proyek jaringan distribusi tegangan projects of mid and low voltage distribution lines
menengah dan rendah 20 kV serta proyek of 20 kV and distribution substation projects.
gardu distribusi.

Perlengkapan Equipment

Perlengkapan untuk aset dalam pembangunan Equipment under construction consists of


termasuk materi dan perlengkapan khusus yang specialised materials and equipment used to
digunakan untuk menunjang fungsi support the generation and distribution of
pembangkitan dan distribusi listrik. electricity.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/65 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan) 6. PROPERTY, PLANT AND EQUIPMENT (continued)

Aset dalam pembangunan (lanjutan) Construction in progress (continued)

Pada tanggal 30 Juni 2023, estimasi persentase As at June 30, 2023, the estimated percentage of
jumlah tercatat aset dalam pembangunan Grup completion of the Group’s construction in progress
terhadap nilai kontrak adalah sebagai berikut: projects was as follows:

Persentase
penyelesaian/
Nilai/ Percentage
Nama Proyek/Project Name Amount of completion

PLTU Kalselteng 2 (2x100 MW) 7,834,173 98%


PLTA Peusangan (2x88 MW) 7,038,276 92%
PLTA Asahan III - Sumatera Utara (2x87 MW) 4,871,167 84%
PLTU 1 Sulut (2x50 MW) 4,102,482 83%
PLTA Jatigede (2x55 MW) 3,594,632 95%
PLTU Timor 1 (2x50 MW) 3,462,523 89%
PLTU Palu 3 (2x50 MW) 3,402,007 87%
PLTU Lombok FTP2 (2x50 MW) 3,139,867 82%
PLTU 1 Kalimantan Barat - Parit Baru (2x50 MW) 1,740,736 86%
PLTMG Luwuk (40 MW) 507,198 89%
Transmisi lainnya/Various transmission lines 59,019,692 2% - 98%
Pembangkitan lainnya/Other power plants 29159446 2% - 98%
Lainnya/Others 11,486,241 2% - 98%

Jumlah/Total 139,358,440

Pada tanggal 31 Desember 2022, estimasi As at December 31, 2022, the estimated percentage
persentase jumlah tercatat aset dalam of completion of the Group’s construction in progress
pembangunan Grup terhadap nilai kontrak adalah projects was as follows:
sebagai berikut:

Persentase
penyelesaian/
Nilai/ Percentage
Nama Proyek/Project Name Amount of completion

PLTU Kalselteng 2 (2x100 MW) 7,440,871 94%


PLTA Peusangan (2x88 MW) 6,771,436 90%
PLTA Asahan III - Sumatera Utara (2x87 MW) 4,107,158 71%
PLTU Lontar Extension (1x315 MW) 4,017,420 99%
PLTA Jatigede (2x55 MW) 3,301,283 94%
PLTU Timor 1 (2x50 MW) 3,107,678 82%
PLTU 1 Sulut (2x50 MW) 2,868,643 66%
PLTU Palu 3 (2x50 MW) 2,708,033 62%
PLTU 1 Kalimantan Barat - Parit Baru (2x50 MW) 1,728,051 86%
PLTU 2 Kalimantan Barat - Bengkayang (2 x 27.5 MW) 786,182 86%
Transmisi lainnya/Various transmission lines 58,302,790 2% - 98%
Pembangkitan lainnya/Other power plants 31,683,342 2% - 98%
Lainnya/Others 8,933,528 2% - 98%

Jumlah/Total 135,756,415

Setelah penyelesaian suatu proyek, masih perlu After completion of a project, there are still a number
dilakukan sejumlah pengujian-pengujian sebelum of tests that need to be performed during the
proyek aset dalam pembangunan menerima commissioning phase before the projects are Certified
Sertifikat Laik Operasi. for Operations.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/66 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan) 6. PROPERTY, PLANT AND EQUIPMENT (continued)

Aset dalam pembangunan (lanjutan) Construction in progress (continued)

Biaya pinjaman yang dikapitalisasi ke pekerjaan Borrowing costs which were capitalised to construction
dalam pelaksanaan adalah sebagai berikut: progress are as follows:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Bunga Pinjaman 1,683,084 1,192,580 Interest expenses


Keuntungan kurs mata uang asing (2,300,319) (993,820) Profit on foreign exchange

Jumlah (617,235) 198,759 Total

Biaya pinjaman dikapitalisasi pada tingkat Bunga Borrowing costs were capitalised at the weighted
rata-rata tertimbang dari pinjaman umum yaitu average rate of general borrowings of 5,08% and
masing-masing sebesar 5.08% dan 2.42% untuk 2,42% for the six-month periods ended June 30,
periode enam bulan yang berakhir pada tanggal 30 2023 and 2022, respectively.
June 2023 dan 2022.

Aset tidak digunakan dalam operasi Assets not used in operations

Aset tidak digunakan dalam operasi meliputi aset Assets not used in operations comprised of property,
tetap yang akan direlokasi, sementara belum plant and equipment to be relocated, those temporarily
digunakan dalam operasi serta aset akan diperbaiki. not in use in operations, and assets to be repaired.

Kerugian penurunan nilai dari penghapusan aset Loss on write-off of assets not used in operations for
yang tidak digunakan dalam operasi untuk periode the six-month periods ended June 30, 2023 and
enam bulan yang berakhir pada tanggal 30 Juni amounted to Rp166,687 and Rp91,053, respectively,
2023 dan 2022 masing-masing sebesar Rp166.687 which are presented as part of the other
dan Rp91.053 yang disajikan sebagai bagian dari income/(expense) - net (Note 46).
penghasilan/(beban) lain-lain - bersih (Catatan 46).

Keuntungan penjualan aset tertentu yang tidak Gain on sale of certain assets not used in operations
digunakan dalam operasi untuk periode enam bulan for the six-month periods ended June 30, 2023
yang berakhir pada tanggal 30 Juni 2023 dan 2022 amounted to Rp7,087 and Rp9,883, respectively (Note
masing-masing adalah sebesar Rp7.087 dan 46).
Rp9.883 (Catatan 46).

Berdasarkan penelaahan manajemen, manajemen Based on management’s assessment, management is


berpendapat bahwa penyisihan penurunan nilai of the opinion that the provision for impairment is
Grup adalah cukup untuk menutupi kemungkinan adequate to cover the possible impairment losses of
adanya kerugian yang timbul dari nilai tercatat aset the carrying amount of fixed assets as at June 30,
tetap pada tanggal 30 Juni 2023 dan 31 Desember 2023 and December 31, 2022.
2022.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/67 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

7. ASET HAK GUNA 7. RIGHT-OF-USE ASSETS


30 Juni 2023/ June 30, 2023
Selisih kurs
dari
penjabaran
laporan
keuangan/
Reklasifikasi Exchange
dan differences
penyesuaian/ due to
Saldo awal/ Reclassification financial Saldo akhir/
Beginning Penambahan/ Pengurangan/ and statements Ending
balance Additions Deductions adjustments translations balance

Biaya perolehan At cost


Tanah 1,074,786 1,067 493 - - 1,075,360 Land
Bangunan umum, waduk Buildings, reservoirs and
dan prasarana 2,314,441 7,422,23 38,202 (461) - 3,018,001 infrastructure
Instalasi dan mesin
pembangkit 43,195,022 2,196,364 2,057,739 (146,484) - 43,187,163 Installations and power plants
Perlengkapan umum 127,917 30,353 24,868 81 - 133,483 General equipment
Kendaraan bermotor 2,340,694 456,132 498,410 (86,514) - 2,211,902 Motor vehicles
Perlengkapan pengolahan Telecommunications and data
data dan telekomunikasi 6,037 - 5,822 14 - 229 processing equipment
Kapal dan perlengkapan 2,912,692 - 889,821 - - 2,022,871 Vessels and equipment

Jumlah 51,971,589 3,426,139 3,515,355 (233,364) - 51,649,009 Total

Akumulasi penyusutan Accumulated depreciation


Tanah 66,105 11,176 493 - - 76,788 Land
Bangunan umum, waduk Buildings, reservoirs and
dan prasarana 947,658 136,827 28,450 7,367 - 1,063,402 infrastructure
Instalasi dan mesin ,
pembangkit 20,512,269 885,347 1,152,401 408,625 - 20,653,840 Installations and power plants
Perlengkapan umum 85,892 22,982 23,375 (300) - 85,199 General equipment
Kendaraan bermotor 1,112,352 284,159 158,146 160,273 - 1,398,638 Motor vehicles
Perlengkapan pengolahan Telecommunications and data
data dan telekomunikasi 3,393 39 5,822 2,502 - 112 processing equipment
Kapal dan perlengkapan 238,727 17,866 74,140 - - 182,453 Vessels and equipment

Jumlah 22,966,396 1,358,396 1,442,827 578,467 - 23,460,432 Total

Jumlah tercatat 29,005,193 28,188,577 Net carrying value

31 Desember 2022/ December 31, 2022


Selisih kurs
dari
penjabaran
laporan
keuangan/
Reklasifikasi Exchange
dan differences
penyesuaian/ due to
Saldo awal/ Reclassification financial Saldo akhir/
Beginning Penambahan/ Pengurangan/ and statements Ending
balance Additions Deductions adjustments translations balance

Biaya perolehan At cost


Tanah 1,053,498 21,292 (4) - - 1,074,786 Land
Bangunan umum, waduk Buildings, reservoirs and
dan prasarana 2,187,241 151,841 (24,483) (158) - 2,314,441 infrastructure
Instalasi dan mesin
pembangkit 43,841,293 41,554 (771,044) - 83,219 43,195,022 Installations and power plants
Perlengkapan umum 107,133 35,577 (15,778) 985 - 127,917 General equipment
Kendaraan bermotor 1,739,095 817,792 (217,050) 857 - 2,340,694 Motor vehicles
Perlengkapan pengolahan Telecommunications and data
data dan telekomunikasi 2,014 684 (137) 3,476 - 6,037 processing equipment
Kapal dan perlengkapan 1,208,346 1,704,346 - - - 2,912,692 Vessels and equipment

Jumlah 50,138,620 2,773,086 (1,028,496) 5,160 83,219 51,971,589 Total

Akumulasi penyusutan Accumulated depreciation


Tanah 43,416 22,689 - - - 66,105 Land
Bangunan umum, waduk Buildings, reservoirs and
dan prasarana 660,188 311,502 (24,007) (25) - 947,658 infrastructure
Instalasi dan mesin
pembangkit 18,751,846 2,234,861 (487,187) 12,749 - 20,512,269 Installations and power plants
Perlengkapan umum 60,881 41,252 (12,381) (3,860) - 85,892 General equipment
Kendaraan bermotor 742,332 589,368 (214,021) (5,327) - 1,112,352 Motor vehicles
Perlengkapan pengolahan Telecommunications and data
data dan telekomunikasi 1,524 1,794 (3,014) 3,089 - 3,393 processing equipment
Kapal dan perlengkapan 115,896 122,831 - - - 238,727 Vessels and equipment

Jumlah 20,376,083 3,324,297 (740,610) 6,626 - 22,966,396 Total

Jumlah tercatat 29,762,537 29,005,193 Net carrying value


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/68 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

7. ASET HAK GUNA (lanjutan) 7. RIGHT-OF-USE ASSETS (continued)

Pada tanggal 30 Juni 2023, aset Pembangkit Listrik As at June 30, 2023, assets of Tanjung Jati B Steam
Tenaga Uap (“PLTU”) Tanjung Jati B 4x660 MW Power Plant (“PLTU”) 4x660 MW were insured with PT
diasuransikan kepada PT Asuransi Mitsui Sumitomo Asuransi Mitsui Sumitomo Indonesia against fire and
Indonesia terhadap risiko kebakaran dan risiko other possible risks with insurance coverage of
lainnya dengan jumlah pertanggungan masing- JPY390,548,530,325 (full amount) or equivalent to
masing sebesar JPY390.548.530.325 (nilai penuh) Rp40,808,259 (2022: JPY390,548,530,325 (full
atau setara dengan Rp40.808.259 (2022: amount) or equivalent to Rp46.067.542) and
JPY390.548.530.325 (nilai penuh) atau setara USD24,320,000 (full amount) or equivalent to
dengan Rp46.067.542) dan USD24.320.000 (nilai Rp364,800 (2022: USD24,320,000 (full amount) or
penuh) atau setara dengan Rp364.800 (2022: equivalent to Rp379,197). The Group’s management
USD24.320.000 (nilai penuh) atau setara dengan believes that the right-of-use assets were adequately
Rp379.197). Manajemen Grup berpendapat bahwa insured as at June 30, 2023 and December 31, 2022.
aset hak guna tersebut telah diasuransikan secara
memadai pada tanggal 30 Juni 2023 dan 31
Desember 2022.

Beban penyusutan untuk aset hak guna Depreciation expense for right-of-use assets was
dialokasikan sebagai berikut: allocated to the following:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Beban usaha Operating expenses


Penyusutan aset hak guna 1,386,009 1,270,402 Right-of-use of assets depreciation
Bahan bakar dan pelumas - - Fuel and lubricants

Subjumlah 1,386,009 1,270,402 Subtotal

Persediaan - 16,931 Inventories


Beban lain-lain - - Other expenses
Aset dalam pembangunan 13,551 61,452 Construction in progress

Jumlah 1,399,560 1,348,785 Total

Nilai beban penyusutan yang dikapitalisasi sebagai The amount of depreciation expense which is
persediaan, sebagian telah dibebankan pada beban capitalised as inventories, has been partially charged
bahan bakar dan pelumas saat persediaan to fuel and lubricants expense when the inventories
digunakan. are used.

Berdasarkan penelaahan manajemen, Grup Based on management’s assessment, the Group is of


berpendapat bahwa tidak terdapat indikasi the opinion that there were no indications of
penurunan nilai aset hak guna pada tanggal 30 Juni impairment of right-of-use assets as at June 30, 2023
2023 dan 31 Desember 2022. and December 31, 2022.

8. PROPERTI INVESTASI 8. INVESTMENT PROPERTIES

30 Juni 2023/ June 30, 2023


Perubahan
Saldo awal/ nilai wajar/ Saldo akhir/
Beginning Change in Pengurangan/ Reklasifikasi/ Ending
balance fair value Deduction Reclassifications balance

Pemilikan langsung Direct acquisitions


Tanah dan bangunan 5,623,489 - - 16,453 5,639,942 Land and buildings

31 Desember/ December 31, 2022


Perubahan
Saldo awal/ nilai wajar/ Saldo akhir/
Beginning Change in Pengurangan/ Reklasifikasi/ Ending
balance fair value Deduction Reclassifications balance

Pemilikan langsung Direct acquisitions


Tanah dan bangunan 5,451,410 223,354 - (51,275) 5,623,489 Land and buildings
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/69 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

8. PROPERTI INVESTASI (lanjutan) 8. INVESTMENT PROPERTIES (continued)

Akun ini merupakan tanah milik Grup, yaitu IP, PJB This account represents pieces of land owned by
dan PLN Batam yang terletak di Pademangan - members of the Group comprising of IP, PJB and
Jakarta Utara, Paiton - Jawa Timur, Bekasi - Jawa PLN Batam, located in Pademangan North Jakarta,
Barat, Pluit - Jakarta Utara, Asahan - Sumatera Paiton - East Java, Bekasi - West Java, Pluit - North
Utara dan Kramatwatu Serang dengan hak legal Jakarta, Asahan - North Sumatera and Kramatwatu
berupa HGB berjangka waktu dari 7 sampai 40 Serang with HGB for periods between seven to 40
tahun, jatuh tempo pada 2032, yang disewakan years until 2032, which are leased to PT Pertamina
kepada PT Pertamina (Persero) (“Pertamina”), PT (Persero) (“Pertamina”), PT Pertamina Hulu Energi
Pertamina Hulu Energi ONWJ, PT Nusantara ONWJ, PT Nusantara Regas, PT Bajradaya
Regas, PT Bajradaya Sentranusa, PT Karya Sentranusa, PT Karya Semesta Gemilang, PT
Semesta Gemilang, PT Shenhua Guohua Shenhua Guohua Pembangkitan Jawa Bali and
Pembangkitan Jawa Bali dan beberapa tanah yang several pieces of land that are leased to third
disewakan ke pihak ketiga. parties.

Selama periode enam bulan yang berakhir tanggal During six-month periods ended June 30, 2023,
30 Juni 2023, beberapa tanah sejumlah Rp369.634 certain lands amounting to Rp369,634 have been
telah direklasifikasi ke aset tetap sedangkan reclassified to fixed assets while certain lands and
beberapa tanah dan bangunan sejumlah Rp386.087 buildings amounting to Rp386,087 have been
telah direklasifikasi dari aset tetap ke properti reclassified from fixed assets to investment properties.
investasi.

Penghasilan sewa yang diperoleh dari properti Rental income earned from investment properties for
investasi untuk periode enam bulan yang berakhir six-month periods ended June 30, 2023 and 2022
pada tanggal 30 Juni 2023 dan 2022 adalah masing- amounted to Rp38,663 and Rp40,245, respectively.
masing sebesar Rp38.663 dan Rp40.245.

Pada tanggal 31 Desember 2022, Grup melakukan As at December 31, 2022, the Group performed a
penilaian kembali atas nilai wajar properti investasi revaluation of the fair value of its investment properties
yang dilakukan oleh KJPP Muttaqin Bambang which was performed by KJPP Muttaqin Bambang
Purwanto Rozak Uswatun dan Rekan berdasarkan Purwanto Rozak Uswatun and Partners based on
laporan No. 02172/2.0027-00/PI/11/0196/1/III/2023 report No. 02172/2.0027-00/PI/11/0196/1/III/2023
tanggal 30 Maret 2023, penilai independen yang dated March 30, 2023, independent valuers registered
telah terdaftar di Kementerian Keuangan dan OJK. with the Ministry of Finance and FSA.

Nilai wajar properti investasi diklasifikasikan sebagai The fair values of investment properties are within
level 2 dalam hierarki nilai wajar. level 2 of the fair value hierarchy.

Nilai wajar level 2 dari tanah dihitung dengan The level 2 fair value of land is calculated using the
menggunakan pendekatan pasar dan pendekatan market approach and income approach. Data inputs
pendapatan. Input yang diperoleh dari pendekatan were obtained from the market approach which
pasar yaitu: consist of:
a. Harga jual atau harga sewa per meter persegi; a. Sale or rental price per square metre;
b. Tingkat hunian; b. Occupancy rate;
c. Tingkat pertumbuhan; dan c. Growth rate; and
d. Tingkat diskonto dan kapitalisasi. d. Discount and capitalisation rate.

Penyesuaian dilakukan berdasarkan ukuran, lokasi, Adjustments were made based on size, location,
bentuk dan spesifikasi, tanah dan hak atas tanah shapes and specifications, land and land rights and
dan elemen perbandingan lainnya. other comparison elements.

Pada 30 Juni 2023 dan 31 Desember 2022, Grup As at June 30, 2023 and December 31, 2022 the
tidak memiliki kewajiban kontraktual untuk perbaikan Group does not have any contractual obligations for
dan perawatan di masa depan. future repairs and maintenance.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/70 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

9. INVESTASI PADA ENTITAS ASOSIASI DAN 9. INVESTMENTS IN ASSOCIATES AND JOINT


VENTURA BERSAMA VENTURES

Rincian investasi pada entitas asosiasi dan ventura The details of investments in associates and joint
bersama adalah sebagai berikut: ventures are as follows:

Persentase penyertaan/
Tahun operasi/ Percentage of ownership (%)
Year of 30 Juni/ Desember 31/
Domisili/ Jenis usaha/ commercial June 30, December 31
Entitas/Entity Domicile Nature of business operations 2023 2022

Entitas asosiasi/Associates
PT Geo Dipa Energi ("GDE") Jakarta Pembangkit tenaga listrik/ 2002 5.50**) 5.50**)
Electricity supplier
PT Mitra Energi Batam ("MEB") Batam Pembangkit tenaga listrik/ 2004 30.00 30.00
Electricity supplier
PT Sumber Segara Primadaya ("S2P") Cilacap Pembangkit tenaga listrik/ 2006 49.00 49.00
Electricity supplier
PT Dalle Energy Batam ("DEB") Batam Pembangkit tenaga listrik/ 2013 20.00 20.00
Electricity supplier
PT Energi Pelabuhan Indonesia ("EPI") Jakarta Pembangkit tenaga listrik/ 2013 45.00 45.00
Electricity supplier
PT Tanjung Kasam Power ("TJK") Batam Pembangkit tenaga listrik/ 2012 10.00**) 10.00**)
Electricity supplier
PT Indo Pusaka Berau ("IPB") Berau Pembangkit tenaga listrik/ 2005 46.53 46.53
Electricity supplier
PT PBM Adhiguna Putera ("PBM AP") Jakarta Pelayaran/Shipping 1987 25.00 25.00
PT Musi Mitra Jaya ("MMJ") Palembang Transportasi batubara/ 2011 25.50 25.50
Coal transportation
PT Sriwijaya Bara Logistic ("SBL") Musi Banyuasin Transportasi batubara/ 2014 25.50 25.50
Coal transportation
PT Rekind Daya Mamuju ("RDM") Jakarta Pembangkit tenaga listrik/ 2018 10.00**) 10.00**)
Electricity supplier
PT Sumbagsel Energi Sakti Pewali Sumatera Pembangkit tenaga listrik/ *) 10.00**) 10.00**)
("SS Pewali") Selatan Electricity supplier

Ventura bersama/Joint ventures


PT Unelec Indonesia ("Unindo") Jakarta Penunjang penyedia tenaga listrik/ 1988 32.35 32.35
Electricity supports
PT Bajradaya Sentranusa ("BDSN") Asahan Pembangkit tenaga listrik/ 2011 36.61 36.61
Electricity supplier
PT Bukit Pembangkit Innovative (“BPI”) Palembang Pembangkit tenaga listrik uap panas/ 2015 40.25 40.25
Steam gas electricity power plant
PT Komipo Pembangkitan Jawa Bali Jepara Operasi dan pemeliharaan/ 2010 49.00 49.00
("Komipo PJB") Operational and maintenance
PT Indo Raya Tenaga ("IRT") Jakarta Pembangkit tenaga listrik/ *) 51.00 51.00
Electricity supplier
PT Rajamandala Electric Power ("REP") Jakarta Pembangkit tenaga listrik/ 2019 51.00 51.00
Electricity supplier
PT Perta Daya Gas ("PDG") Jakarta Transportasi dan penyimpanan LNG/ 2015 35.00 35.00
Transportation and storage of LNG
PT Crompton Prima Switchgear Jakarta Peralatan pengontrol dan
Indonesia ("CPSI") pendistribusian listrik/ 2014 49.00 49.00
Electricity controller and distribution
PT Shenhua Guohua Jakarta Pembangkit tenaga listrik/ 2019 30.00 30.00
Pembangkitan Jawa Bali ("SGPJB") Electricity supplier
PT GCL Indotenaga ("GCL") Jakarta Pembangkit tenaga listrik/ 2021 35.00 35.00
Electricity supplier
PT Guohua Taidian Jakarta Pembangkit tenaga listrik/ 2019 30.00 30.00
Pembangkitan Jawa Bali ("GTPJB") Electricity supplier
PT North Sumatra Hydro Energy ("NSHE") Sumatera Utara Pembangkit tenaga listrik/ *) 25.00 25.00
Electricity supplier
PT Pembangkitan Jawa Bali Masdar Jakarta Pembangkit tenaga listrik/ *) 51.00 51.00
Solar Energi ("PMSE") Electricity supplier
PT Maxpower Cogindo Batam (“MCB”) Batam Pembangkit tenaga listrik, kelistrikan, 2022 30.00 30.00
perdagangan besar mesin kantor dan
industri, suku cadang dan
perlengkapannya/Power generation,
supporting activities electricity,
wholesaler of office machinery and
industry, spare parts and fittings
PT Industri Baterai Indonesia (“IBI”) Jakarta Industri EV Battery dan ESS/ *) 25.00 25.00
EV Battery and ESS Industry

*) Dalam tahap pengembangan *) In development stage


**) Terdapat perwakilan PLN **) There is PLN’s representative
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/71 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

9. INVESTASI PADA ENTITAS ASOSIASI DAN 9. INVESTMENTS IN ASSOCIATES AND JOINT


VENTURA BERSAMA (lanjutan) VENTURES (continued)

Seluruh entitas asosiasi dan ventura bersama All the associates and joint ventures are recorded by
dicatat oleh Grup dengan menggunakan metode the Group using the equity method. They are private
ekuitas. Seluruh entitas adalah entitas tertutup dan entities and there is no quoted market price available
tidak terdapat harga pasar yang dikutip yang for their shares.
tersedia untuk sahamnya.

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, 2022,
manajemen berpendapat bahwa tidak terdapat management believes that there is no restriction and
pembatasan dan risiko signifikan yang terkait significant risk regarding the investments in associates
dengan investasi pada asosiasi dan ventura and joint ventures.
bersama.

Mutasi investasi pada entitas asosiasi dan ventura Changes in investments in associates and joint
bersama adalah sebagai berikut: ventures are as follows:
30 Juni/ June 30, 2023
Jumlah Bagian atas Bagian atas Jumlah
tercatat laba/(rugi) penghasilan/ tercatat
1 Januari bersih (kerugian) 30 Juni
2023/ entitas/ komprehensif 2023/
Carrying Share lainnya/ Carrying
amount in net Share of other amount
January 1, Penambahan/ income/ comprehensive Dividen/ June 30,
2023 Additions (loss) income/(loss) Dividends 2023

Entitas asosiasi Associates


S2P 6,702,401 - 603,027 - - 7,305,428 S2P
SBL 335,061 - 7,228 - 342,289 SBL
MMJ 255,178 - 3,512 - 258,690 MMJ
TJK 139,107 - (545) - 138,562 TJK
MEB 133,463 - 2,757 136,220 MEB
IPB 122,602 - (10,171) - - 112,431 IPB
GDE 114,458 - - - - 114,458 GDE
DEB 107,959 - (2,310) - 105,649 DEB
EPI 54,955 - (284) - (527) 54,144 EPI
RDM 57,596 - (768) (20) - 56,808 RDM
AGP 36,147 - 16,181 - - 52,328 AGP
SS Pewali 26,787 - - - - 26,787 SS Pewali

Subjumlah 8,085,714 - 618,627 (20) (527) 8,703,794 Subtotal

Ventura bersama Joint ventures


IRT 5,693,459 - 402,667 (134,436) - 5,961,690 IRT
SGPJB 4,257,899 - 330,037 - - 4,587,936 SGPJB
BPI 1,766,927 - 24,731 (66,924) - 1,724,734 BPI
NSHE 1,857,315 - 104,251 - - 1,961,566 NSHE
BDSN 1,216,250 - 59,282 74,357 (151,212) 1,198,677 BDSN
GCL 796,984 - 66,788 - - 863,772 GCL
REP 142,903 - 5,812 - - 148,715 REP
IBI 112,951 - - - - 112,951 IBI
PMSE 149,866 - 5,256 - - 155,122 PMSE
Komipo PJB 76,190 - 23,624 - - 99,814 Komipo PJB
PDG 62,992 - 8,932 - - 71,924 PDG
PDP 11,409 - - - - 11,409 PDP
MCB 9,521 - - - - 9,521 MCB
GTPJB 3,088 - 136 - - 3,224 GTPJB
CPSI - - - - - - CPSI

Subjumlah 16,157,754 - 1,031,516 (127,003) (151,212) 16,911,055 Subtotal

Jumlah 24,243,468 - 1,650,143 (127,023) (151,739) 25,614,848 Total


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/72 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

9. INVESTASI PADA ENTITAS ASOSIASI DAN 9. INVESTMENTS IN ASSOCIATES AND JOINT


VENTURA BERSAMA (lanjutan) VENTURES (continued)

Mutasi investasi pada entitas asosiasi dan ventura Changes in investments in associates and joint
bersama adalah sebagai berikut: (lanjutan) ventures are as follows: (continued)
31 Desember/ December 31, 2022
Jumlah Bagian atas Bagian atas Jumlah
tercatat laba/(rugi) penghasilan/ tercatat
1 Januari bersih (kerugian) 31 Desember
2022/ entitas/ komprehensif 2022/
Carrying Share lainnya/ Carrying
amount in net Share of other amount
January 1, Penambahan/ income/ comprehensive Dividen/ December 31,
2022 Additions (loss) income/(loss) Dividends 2022

Entitas asosiasi Associates


S2P 5,192,671 - 1,785,106 - (275,376) 6,702,401 S2P
SBL 326,100 - 664 8,297 - 335,061 SBL
MMJ 245,332 - 6,498 3,348 - 255,178 MMJ
TJK 121,970 - 17,810 71 (744) 139,107 TJK
MEB 130,118 - 3,345 - - 133,463 MEB
IPB 123,948 - 3,171 - (4,517) 122,602 IPB
GDE 114,458 - - - - 114,458 GDE
DEB 107,312 - 7,647 - (7,000) 107,959 DEB
EPI 52,144 - 4,360 - (1,549) 54,955 EPI
RDM 54,497 - (1,825) 4,924 - 57,596 RDM
AGP 53,392 - (10,039) (521) (6,685) 36,147 AGP
SS Pewali 25,505 - 1,282 - - 26,787 SS Pewali

Subjumlah 6,547,447 - 1,818,019 16,119 (295,871) 8,085,714 Subtotal

Ventura bersama Joint ventures


IRT 3,292,871 - 533,160 1,867,428 - 5,693,459 IRT
SGPJB 3,310,343 - 718,315 336,427 (107,186) 4,257,899 SGPJB
BPI 1,502,427 - 96,511 167,989 - 1,766,927 BPI
NSHE 1,236,983 393,398 103,652 123,282 - 1,857,315 NSHE
BDSN 936,965 - 58,414 327,195 (106,324) 1,216,250 BDSN
GCL 613,580 - 223,803 70,614 (111,013) 796,984 GCL
REP 125,627 - 7,443 9,833 - 142,903 REP
PDP - - 11,709 - (300) 11,409 PDP
IBI 48,951 64,000 - - - 112,951 IBI
PMSE 69,243 - 72,779 7,844 - 149,866 PMSE
Komipo PJB 59,487 - 21,603 - (4,900) 76,190 Komipo PJB
PDG 55,954 - 9,792 - (2,754) 62,992 PDG
MCB 8,235 - 120 1,166 - 9,521 MCB
GTPJB 2,726 - 269 259 (166) 3,088 GTPJB
CPSI - - - - - - CPSI

Subjumlah 11,263,392 457,398 1,857,570 2,912,037 (332,643) 16,157,754 Subtotal

Jumlah 17,810,839 457,398 3,675,589 2,928,156 (628,514) 24,243,468 Total


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/73 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

9. INVESTASI PADA ENTITAS ASOSIASI DAN 9. INVESTMENTS IN ASSOCIATES AND JOINT


VENTURA BERSAMA (lanjutan) VENTURES (continued)

Berikut ini adalah ringkasan informasi keuangan The following table contains the summarised financial
entitas asosiasi dan ventura bersama pada information for associates and joint ventures as at
30 Juni 2023 dan 31 Desember 2022 yang dicatat June 30, 2023 and December 31, 2022 which are
dengan menggunakan metode ekuitas. accounted for using the equity method.

Entitas asosiasi Associates

30 Juni/June 30, 2023


Lain-lain/
S2P MMJ SBL Jumlah/ Total
Others

Lancar
Kas dan setara kas 1,270,671 4,211 3,246 1,974,498 3,252,626 Cash and cash equivalents
Aset lancar lainnya Other current assets
(tidak termasuk kas) 14,389,780 275,248 375,849 955,540 15,996,417 (excluding cash)

Jumlah aset lancar 15,660,451 279,459 379,096 2,930,038 19,249,043 Total current assets

Liabilitas keuangan Financial liab ilities


Utang usaha 1,386,600 208,392 159,724 265,723 2,020,439 Trade payab les
Liabilitas lancar lainnya 3,854,378 207,003 65,735 599,277 4,726,392 Other current liab ilities

Jumlah liabilitas lancar 5,240,978 415,394 225,459 865,000 6,746,831 Total current liab ilities

Tidak lancar
Aset 19,964,077 777,843 356,381 7,925,759 29,024,061 Total non-current liab ilities

Liabilitas Liab ilities


Liabilitas keuangan 2,599,416 447,438 88,076 2,348,653 5,483,582 Financial liab ilities
Liabilitas lainnya 4,916,576 18,782 61,612 1,201,643 6,198,613 Other liab ilities

Jumlah liabilitas tidak lancar 7,515,992 466,219 149,688 3,550,296 11,682,195 Total non-current liab ilities

Aset bersih 22,867,559 175,688 360,330 6,440,501 29,844,078 Net assets

% kepemilikan efektif 49.00% 25.50% 25.50% 6.67% - 46.53% % of ownership

Bagian Grup atas aset bersih The Group’s share of the net
asosiasi 11,205,104 44,801 91,884 806,862 12,148,650 assets of associates
Penyesuaian ISAK 16 Adjusment of ISAK 16
Penyesuaian metode ekuitas (3,899,676) 213,889 250,405 (9,474) (3,444,856) Adjustments of equity methods

Jumlah tercatat 7,305,428 258,690 342,289 797,388 8,703,794 Total carrying value

Pendapatan 7,924,642 142,397 231,327 714,026 9,012,392 Revenue


Beban pokok penjualan (5,825,334) (120,063) (195,484) (734,573) (6,875,455) Cost of revenue
Depresiasi dan amortisasi (166,776) - - (12,778) (179,554) Depreciation and amortisation
Pendapatan keuangan - (5) 19 103 118 Finance income
Beban keuangan (356,934) - - (123) (357,057) Finance costs
Beban operasi (10) (2,558) (2,354) (230,430) (235,352) Operating expenses
Pendapatan (beban) lain-lain, - (6,000) (5,163) (94) (11,257) Other income/(expenses)
bersih 2,191 - - (127,489) (125,298) net
Beban pajak penghasilan (347,111) - - (63,343) (410,454) Income tax expense

Laba/(rugi) periode berjalan 1,230,667 13,772 28,345 (454,701) 818,083 Profit/(loss) for the periode

% kepemilikan efektif 49.00% 25.50% 25.50% 6.67% - 46.53% % of ownership

Bagian Grup atas laba/(rugi) The Group’s share in net income/


asosiasi periode berjalan 603,027 3,512 7,228 4,860 618,627 (loss) for the year of associates

Laba/(rugi) komprehensif lainnya - - - (200) (200) The Group’s share


Bagian Grup atas laba/(rugi) of other comprehensive
komprehensif asosiasi - - - (20) (20) income of associates

Dividen yang diterima dari Dividends received


perusahaan asosiasi - - - (527) (527) from associates
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/74 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

9. INVESTASI PADA ENTITAS ASOSIASI DAN 9. INVESTMENTS IN ASSOCIATES AND JOINT


VENTURA BERSAMA (lanjutan) VENTURES (continued)

Entitas asosiasi (lanjutan) Associates (continued)


31 Desember/ December 31, 2022
Lainnya/ Jumlah/
S2P MMJ SBL Others Total

Kas dan setara kas 1,585,991 7,959 2,582 2,058,053 3,654,585 Cash and cash equivalents
Aset lancar lainnya Other current assets
(tidak termasuk kas) 3,416,904 232,207 299,589 1,240,819 5,189,519 (excluding cash)

Jumlah aset lancar 5,002,895 240,166 302,171 3,298,872 8,844,104 Total current assets

Aset tidak lancar 30,970,555 750,355 348,145 8,841,498 40,910,553 Non-current assets

Liabilitas keuangan Financial liabilities


Utang usaha 1,588,051 172,751 96,695 220,914 2,078,411 Trade payables
Liabilitas lancar lainnya 4,915,883 176,986 55,449 846,825 5,995,143 Other current liabilities

Jumlah liabilitas lancar 6,503,934 349,737 152,144 1,067,739 8,073,554 Total current liabilities

Liabilitas Liabilities
Liabilitas keuangan 8,275,878 472,779 89,463 3,066,845 11,904,965 Financial liabilities
Liabilitas lainnya 7,515,269 5,935 67,076 1,324,911 8,913,191 Other liabilities

Jumlah liabilitas tidak lancar 15,791,147 478,714 156,539 4,391,756 20,818,156 Total non-current liabilities

Aset bersih 13,678,369 162,070 341,633 6,680,875 20,862,947 Net assets

% kepemilikan 49.00% 25.50% 25.50% 5.50% - 46.53% % of ownership

Bagian Grup atas aset bersih The Group’s share of the net
asosiasi 6,702,401 41,328 87,116 874,110 7,704,955 assets of associates
Penyesuaian metode ekuitas - 213,850 247,945 (81,036) 380,759 Adjustments of equity methods

Jumlah tercatat 6,702,401 255,178 335,061 793,074 8,085,714 Total carrying value

Pendapatan 12,563,860 226,859 173,105 2,226,139 15,189,963 Revenue


Beban pokok pendapatan (5,959,095) (169,659) (113,726) (1,527,204) (7,769,684) Cost of revenue
Depresiasi dan amortisasi (43,806) - - (90,802) (134,608) Depreciation and amortisation
Pendapatan keuangan 3,572 - - 273 3,845 Finance income
Beban keuangan (965,962) 63 46 (58,286) (1,024,139) Finance costs
Beban operasi (2,387,543) (5,589) (5,912) (625,838) (3,024,882) Operating expenses
Pendapatan/(beban) lain-lain,
bersih 1,122,370 (12,232) (37,338) (112,340) 960,460 Other income/(expenses) - net
Beban pajak penghasilan (690,322) (13,960) (13,571) (95,238) (813,091) Income tax expense

Laba/(rugi) tahun berjalan 3,643,074 25,482 2,604 (283,296) 3,387,864 Profit/(loss) for the year

% kepemilikan 49.00% 25.50% 25.50% 5.50% - 46.53% % of ownership

The Group’s share in


Bagian Grup atas laba/(rugi) net income/(loss) for
bersih asosiasi tahun berjalan 1,785,106 6,498 664 25,751 1,818,019 the year of associates

Other comprehensive
Penghasilan komprehensif lainnya - 13,129 32,537 47,865 93,531 income

Bagian Grup atas penghasilan The Group’s share


komprehensif lainnya of other comprehensive
asosiasi - 3,348 8,297 4,474 16,119 income of associates

Dividen yang diterima dari Dividends received


perusahaan asosiasi (275,376) - - (20,495) (295,871) from associates
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/75 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

9. INVESTASI PADA ENTITAS ASOSIASI DAN 9. INVESTMENTS IN ASSOCIATES AND JOINT


VENTURA BERSAMA (lanjutan) VENTURES (continued)

Ventura bersama Joint ventures

30 Juni/June 30, 2023


Lain-lain/
BDSN BPI IRT SGPJB NSHE Jumlah
Others

Lancar
Kas dan setara kas 432,613 73,486 1,138,145 3,386,149 1,470,513 1,144,153 7,645,059 Cash and cash equivalents
Aset lancar lainnya Other current assets
(tidak termasuk kas) 662,429 306,309 4,743,188 6,938,156 130,005 919,982 13,700,069 (excluding cash)

Jumlah aset lancar 1,095,042 379,795 5,881,333 10,324,305 1,600,518 2,064,135 21,345,129 Total current assets

Liabilitas keuangan Financial liabilities


Utang usaha 146,629 132,490 743,349 5,491 847,511 492,003 2,367,473 Trade payables
Liabilitas lancar lainnya 138,361 111,010 1,590,694 3,614,750 59,247 1,013,579 6,527,641 Other current liabilities

Jumlah liabilitas lancar 284,990 243,500 2,334,044 3,620,241 906,758 1,505,582 8,895,114 Total current liabilities

Tidak lancar
Aset 5,547,340 4,684,770 34,471,765 23,389,960 11,360,639 9,271,202 88,725,675 Total non-current liabilities

Liabilitas Liabilities
Liabilitas keuangan 2,250,528 - - 11,008,238 - 964,861 14,223,627 Financial liabilities
Liabilitas lainnya 1,124,308 552,332 26,755,502 4,336,318 4,592,803 5,278,062 42,639,326 Other liabilities

Jumlah liabilitas tidak lancar 3,374,836 552,332 26,755,502 15,344,556 4,592,803 6,242,923 56,862,953 Total non-current liabilities

Aset bersih 2,982,556 4,268,734 11,263,552 14,749,468 7,461,596 3,586,832 44,312,737 Net assets

% kepemilikan efektif 37% 37% 51% 30% 25% % of ownership

Bagian Grup atas aset bersih The Group’s share of the net
asosiasi 1,091,914 1,590,103 5,744,411 4,424,840 1,865,399 1,349,179 16,065,847 assets of associates
Penyesuaian ISAK 16 Adjusment of ISAK 16
Penyesuaian metode ekuitas 106,764 134,631 217,279 163,096 96,167 127,271 845,208 Adjustments of equity methods

Jumlah tercatat 1,198,678 1,724,734 5,961,690 4,587,936 1,961,566 1,476,450 16,911,055 Total carrying value

Pendapatan 259,657 548,086 5,401,598 4,903,613 1,978,205 1,038,771 14,129,930 Revenue


Beban pokok penjualan (22,479) (381,247) (3,690,195) (3,140,849) (1,376,323) (746,613) (9,357,705) Cost of revenue
Depresiasi dan amortisasi (89) (3,090) (2,187) - - (58,060) (63,426) Depreciation and amortisation
Pendapatan keuangan 2,103 - 132 157,200 - 25,912 185,347 Finance income
Beban keuangan (34,028) - (1,096,799) (684,212) (64,092) (231,914) (2,111,045) Finance costs
Beban operasi - (40,680) (8,395) (99,924) (22,004) (73,143) (244,145) Operating expenses
Pendapatan (beban) lain-lain, - - - - - - - Other income/(expenses)
bersih - (2,851) 337,355 30 - 368,274 702,808 net
Beban pajak penghasilan (43,236) (53,826) (151,965) (35,735) (98,783) (36,520) (420,064) Income tax expense

Laba/(rugi) periode berjalan 161,929 66,393 789,544 1,100,123 417,003 286,707 2,821,700 Profit/(loss) for the periode

% kepemilikan efektif 37% 37% 51% 30% 25% 30%-51% % of ownership

Bagian Grup atas laba/(rugi) The Group’s share in net income/


asosiasi periode berjalan 59,282 24,732 402,667 330,037 104,251 110,547 1,031,516 (loss) for the year of associates

Laba/(rugi) komprehensif lainnya 203,105 (179,661) (263,600) (240,156) The Group’s share
Bagian Grup atas laba/(rugi) of other comprehensive
komprehensif asosiasi 74,357 (66,924) (134,436) (127,003) income of associates

Dividen yang diterima dari Dividends received


perusahaan asosiasi (151,212) - - - - - (151,212) from associates
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/76 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

9. INVESTASI PADA ENTITAS ASOSIASI DAN 9. INVESTMENTS IN ASSOCIATES AND JOINT


VENTURA BERSAMA (lanjutan) VENTURES (continued)

Ventura bersama (lanjutan) Joint ventures (continued)

31 Desember/ December 31, 2022


Lainnya/ Jumlah/
BPI IRT SGPJB BDSN NSHE Others Total

Kas dan setara kas 46,288 230,682 3,666,740 652,936 302,515 946,527 5,845,688 Cash and cash equivalents
Aset lancar lainnya Other current assets
(tidak termasuk kas) 650,825 72,211 6,711,063 662,198 68,013 918,415 9,082,725 (excluding cash)

Jumlah aset lancar 697,113 302,893 10,377,803 1,315,134 370,528 1,864,942 14,928,413 Total current assets

Aset tidak lancar 4,791,900 35,678,691 24,747,224 5,822,212 9,806,685 9,749,442 90,596,154 Non-current assets

Liabilitas keuangan Financial liabilities


Utang usaha 311,760 8,313 5,166 66,175 - 343,928 735,342 Trade payables
Liabilitas lancar lainnya 230,868 2,014,502 4,142,617 193,967 534,888 1,265,249 8,382,091 Other financial liabilities

Jumlah liabilitas lancar 542,628 2,022,815 4,147,783 260,142 534,888 1,609,177 9,117,433 Total current liabilities

Liabilitas Liabilities
Liabilitas keuangan - 20,898,567 15,314,854 2,363,502 529,228 5,807,423 44,913,574 Financial liabilities
Liabilitas lainnya 574,070 1,896,556 1,469,393 1,171,747 1,702,698 777,944 7,592,408 Other liabilities

Jumlah liabilitas tidak lancar 574,070 22,795,123 16,784,247 3,535,249 2,231,926 6,585,367 52,505,982 Total of non-current liabilities

Aset bersih 4,372,315 11,163,646 14,192,997 3,341,955 7,410,399 3,419,840 43,901,152 Net assets

% kepemilikan 40.25% 51% 30% 36.61% 25% 30.00%-51.00% % of ownership

Bagian Grup atas aset bersih The Group’s share of the net
ventura bersama 1,759,857 5,693,459 4,257,899 1,223,490 1,852,600 1,282,554 16,069,859 assets of joint ventures
Penyesuaian metode ekuitas 7,070 - - (7,240) 4,715 83,350 87,895 Adjustments of equity methods

Jumlah tercatat 1,766,927 5,693,459 4,257,899 1,216,250 1,857,315 1,365,904 16,157,754 Total carrying value

Pendapatan 1,063,858 14,227,566 9,454,486 641,023 3,280,340 3,121,965 31,789,238 Revenue


Beban pokok pendapatan (721,440) (11,747,487) (5,756,034) (59,386) (2,640,055) (1,569,993) (22,494,395) Cost of revenue
Depresiasi dan amortisasi (5,955) - (11,981) (1,226) - (150,326) (169,488) Depreciation and amortisation
Pendapatan keuangan 1,171 265 137,971 - - 9,792 149,199 Finance income
Beban keuangan (5,888) (1,185,383) (922,757) (266,181) (69,978) (432,719) (2,882,906) Interest expense
Beban operasi (85,933) (41,795) (225,227) - (43,111) (56,332) (452,398) Operating expenses
Pendapatan/(beban) lain-lain,
bersih 126,772 174,639 (218,613) (85,239) 15,453 160,282 173,294 Other income/(expense) - net
Beban pajak penghasilan (132,806) (382,394) (63,461) (69,434) (128,042) (134,514) (910,651) Income tax expense

Laba tahun berjalan 239,779 1,045,411 2,394,384 159,557 414,607 948,155 5,201,894 Profit for the year

% kepemilikan 40.25% 51.00% 30.00% 36.61% 25.00% 30.00%-51.00% % of ownership

The Group’s share of


Bagian Grup atas laba bersih net income for
ventura bersama tahun berjalan 96,511 533,160 718,315 58,414 103,652 347,517 1,857,569 the year of joint ventures

Penghasilan komprehensif Other comprehensive


lainnya 417,364 3,661,624 1,121,423 893,731 493,127 241,165 6,828,434 income

Bagian atas penghasilan Share of other comprehensive


komprehensif lainnya income
ventura bersama 167,989 1,867,428 336,427 327,195 123,282 89,716 2,912,037 of joint ventures

Dividen yang diterima dari Dividends received


perusahaan ventura bersama - - (107,186) (106,324) - (119,133) (332,643) from joint ventures

Investasi pada entitas di atas diperoleh terutama The investments in the above entities are held
untuk tujuan potensi pertumbuhan jangka panjang, primarily for long-term growth potential, since these
karena seluruh entitas tersebut bergerak dalam entities are engaged in the same electricity industry as
industri ketenagalistrikan yang sama dengan industri the Group. Management believes that there is no
Grup. Manajemen meyakini bahwa tidak ada indication of impairment.
indikasi penurunan nilai.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/77 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI 10. RECEIVABLES FROM RELATED PARTIES

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

SGPJB 808,728 849,106 SGPJB


REP 413,780 415,493 REP
PDG 54,855 79,733 PDG
GCL 70,422 70,422 GCL
PMSE 10,430 11,181 PMSE
Lain-lain 702,667 93,341 Others

Jumlah 2,060,882 1,519,276 Total

Dikurangi: bagian lancar 59,578 231,006 Less: current portion

Bagian tidak lancar 2,001,304 1,288,270 Non-current portion

SGPJB SGPJB

Pada tanggal 20 November 2018, PJBI, entitas anak On November 20, 2018, PJBI, a PNP subsidiary,
PNP, memberikan pinjaman jangka panjang sebesar granted a long-term loan to SGPJB amounting to
USD56.516.733 kepada SGPJB dengan suku bunga USD56,516,733 with an interest rate of LIBOR 6
LIBOR 6 bulan + 4%. Pinjaman akan jatuh tempo months + 4%. The loan will mature on December 15,
pada tanggal 15 Desember 2033. Pelunasan 2033. The interest will be due every January 15 and
pembayaran bunga dilakukan setiap tanggal 15 July 15. During six-month periods ended June 30,
Januari dan 15 Juli. Selama periode enam bulan 2023, SGPJB didn’t’ made any loan payments (2022:
yang berakhir pada tanggal 30 Juni 2023, SGPJB USD4,347,441 or equivalent to Rp64,720).
tidak ada melakukan pembayaran pinjaman (2022:
USD4.347.441 atau setara dengan Rp64.720).

Pada tanggal 30 Juni 2023, saldo piutang pokok As at June 30, 2023, PNP’s principal outstanding loan
pinjaman PNP dari SGPJB adalah sebesar balance from SGPJB was USD52,169,293 (equivalent
USD52.169.293 (setara dengan Rp808.728) dan to Rp808,728) and interest receivables amounted to
piutang bunga sebesar USD3.704.622 (setara USD3,704,622 (equivalent to Rp55,569).
dengan Rp55.569).

Pada tanggal 31 Desember 2022, saldo piutang As at December 31, 2022, PNP’s principal outstanding
pokok pinjaman PNP dari SGPJB adalah sebesar loan balance from SGPJB was USD52,169,292
USD52.169.292 (setara dengan Rp813.424) dan (equivalent to Rp813,424) and interest receivables
piutang bunga sebesar USD2.288.456 (setara amounted to USD2,288,456 (equivalent to Rp35,682).
dengan Rp35.682).

REP REP

Pada tanggal 4 Juli 2014, PIP, entitas anak, On July 4, 2014, PIP, a subsidiary, provided a long-
memberikan pinjaman jangka panjang sebesar term loan of USD9,399,962 to REP, an associate, for
USD9.399.962 kepada REP, entitas asosiasi, untuk the financing of the 46.6 MW project at Hydroelectric
membiayai proyek 46,6 MW di Pembangkit Listrik Power Plant (“HPP”) Citarum River at Cianjur, West
Tenaga Air (“PLTA”) Sungai Citarum di Cianjur, Java. This loan bears interest of 10% per annum with
Jawa Barat. Pinjaman ini dikenakan bunga 10% per a 17.5 year term of repayment after a grace period
tahun dengan jangka waktu 17,5 tahun setelah during construction. The Commercial Operation Date
grace period selama pembangunan. Tanggal (“COD”) has been amended, most recently through
operasi komersial PLTA telah diamandemen, the First Amendment of PPA dated August 10, 2017,
terakhir kali melalui Amandemen Pertama atas become 57 months after the financial close date. On
PJBTL tertanggal 10 Agustus 2017, menjadi 57 May 12, 2019, the HPP Rajamandala 1 x 47 MW was
bulan setelah tanggal pendanaan. Pada tanggal 12 commercially operated based on COD certificate No.
Mei 2019, PLTA Rajamandala 1 x 47 MW telah 188.BA/159/REP/2019. The principal shall be invoiced
beroperasi secara komersial berdasarkan sertifikat and due every six months starting on COD.
tanggal operasi komersial No.
188.BA/159/REP/2019. Pokok pinjaman akan
ditagihkan dan terutang setiap enam bulan sejak
tanggal operasi komersial.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/78 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan) 10. RECEIVABLES FROM RELATED PARTIES
(continued)

REP (lanjutan) REP (continued)

Pada tanggal 23 November 2016, PIP memberikan On November 23, 2016, PIP provided additional loans
tambahan pinjaman sebesar USD5.724.490 kepada of USD5,724,490 to REP with similar terms and
REP dengan persyaratan dan kondisi yang sama conditions to the previous loan.
dengan pinjaman sebelumnya.

Pada tanggal 30 Juni 2023, saldo pokok pinjaman As at June 30, 2023, PIP’s principal amounts due from
PIP kepada REP adalah sebesar USD15.124.452 REP is USD15,124,452 or equivalent to Rp226,866
atau setara dengan Rp226.866 (2022: (2022: USD15,124,452 or equivalent to Rp235,820)
USD15.124.452 atau setara dengan Rp235.820) and interest receivables amounted to USD12,237,122
dan piutang bunga sebesar USD12.237.122 atau or equivalent to Rp183,557 (2022: USD11,487,115 or
setara dengan Rp183.557 (2022: USD11.487.115 equivalent to Rp179,107). Other receivables of
atau setara dengan Rp179.107). Piutang lainnya Rp3,357 (2022: Rp566) represents costs of employee
sebesar Rp3.357 (2022: Rp566) merupakan biaya relocation and operation and maintenance services
relokasi pegawai dan pendapatan jasa operasi dan revenue.
pemeliharaan.

Pada tanggal 30 Juni 2023, penghasilan bunga As at June 30, 2023, interest income amounted to
masing-masing adalah sebesar USD750.007 atau USD750,007 or equivalent to Rp11,241 (2022:
setara dengan Rp11.241 (2022: USD1.512.445 atau USD1,512,445 or equivalent to Rp22,565) which is
setara dengan Rp22.565) yang disajikan dalam presented in the consolidated statements of profit or
laporan laba rugi konsolidasian. loss.

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, 2022, there
tidak ada pembayaran kembali pokok pinjaman dan was no repayment of the loan principal and interest
bunga yang dibayarkan oleh REP. IP tidak berhak paid by REP. IP is not entitled to request repayment
untuk meminta pembayaran kembali atas pokok of loan principal provided to REP before the Senior
pinjaman yang diberikan kepada REP sebelum Facility Release Date, while interest paid by REP
Tanggal Pembebasan Fasilitas Senior, namun untuk should fulfil several terms and conditions as stated
pembayaran bunga yang dilakukan oleh REP harus in the shareholder agreement as follows:
memenuhi syarat dan kondisi yang tertuang dalam
perjanjian pemegang saham sebagai berikut:
- Uang yang ada pada kredit dari Rekening
Distribusi; atau - The monies stand to the credit of the Distribution
- Sumber - sumber lain yang dapat disetujui secara Accounts; or
tertulis oleh Agen Antar Kreditur. - Other sources as may be approved in writing by
the Intercreditor Agent.

PDG PDG

Pada tanggal 12 Juni 2013, IP, entitas anak, On June 12, 2013, IP, a subsidiary, granted a long-
memberikan pinjaman jangka panjang sebesar term loan amounting to USD18,837,112 to PDG, a
USD18.837.112 kepada PDG, ventura bersama, joint venture, for financing the PLTU Tambak Lorok,
untuk membiayai proyek PLTU Tambak Lorok, Semarang. On November 30, 2015, IP made an
Semarang. Pada tanggal 30 November 2015, IP amendment to the long-term loan given to PDG which
melakukan amandemen atas pinjaman jangka resulted in the revision of the total loan granted to
panjang yang diberikan kepada PDG sehingga become USD18,191,529 in accordance with the funds
jumlah pinjaman berubah menjadi USD18.191.529 transferred up to January 9, 2014, and the tenor of the
sesuai dengan jumlah seluruh pencairan hingga loan was amended to eight years and will be due on
tanggal terakhir yakni 9 Januari 2014 dan jangka December 1, 2023. This loan bears interest of 6.5%
waktu pinjaman berubah menjadi delapan tahun per annum.
yang akan jatuh tempo pada 1 Desember 2023.
Pemberian pinjaman ini dikenakan bunga 6,5% per
tahun.

Jumlah bunga atas pokok pinjaman terutang selama The total interest on the principal during the
masa pembangunan proyek (Interest During construction of the project (Interest During
Construction) dihitung sejak tanggal pencairan dana Construction) is effective from the date of cash
sampai tanggal 30 Mei 2014 dan dibayarkan secara withdrawal until May 30, 2014 and was fully paid on
penuh pada tanggal 1 Juni 2016. Pokok pinjaman June 1, 2016. The principal shall be collected every six
akan ditagihkan setiap 6 bulan dari tanggal 1 Juni months from June 1, 2016 until December 1, 2023.
2016 sampai dengan 1 Desember 2023.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/79 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan) 10. RECEIVABLES FROM RELATED PARTIES
(continued)

PDG (lanjutan) PDG (continued)

Pada periode enam bulan yang berakhir pada During six month periods ended June 30, 2023, PDG
tanggal 30 Juni 2023, PDG melakukan pembayaran has made loan payments of principal amounting to
pinjaman atas pokok sebesar USDnihil (setara USDnil (equivalent to Rpnil) and interest amounting to
dengan Rpnihil) dan bunga sebesar USDnihil USDnil (equivalent to Rpnil) (2022: principal
(setara dengan Rpnihil) (2022: USD2.273.941 USD2,273,941 (equivalent to Rp34,644) and interest
(setara dengan Rp34.644) dan bunga sebesar amounting to USD828,877 (equivalent to Rp12,614))..
USD828.877 (setara dengan Rp12.614) (2022:
USD2.273.941 (setara dengan Rp34.644)).

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, 2022, IP’s
saldo pokok pinjaman PIP dari PDG masing-masing principal outstanding loan balance from PDG was
adalah sebesar USD3.410.912 (setara dengan USD3,410,912 (equivalent to Rp51,164) and
Rp51.164) dan USD4.547.882 (setara dengan USD4,547,882 (equivalent to Rp70,911), respectively,
Rp70.911) dan piutang bunga sebesar USD246.104 and interest receivables amounted to USD246,104
(setara dengan Rp3.691) dan USD459.361 (setara (equivalent Rp3.691) and USD459,361 (equivalent to
dengan Rp7.162). Rp7.986), respectively.

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, 2022, other
piutang lainnya sebesar Rp3.142 dan Rp1.660, receivables amounted to Rp3,142 and Rp1,660
merupakan piutang atas bunga dan biaya pegawai. respectively, representing interest receivables and
employee costs.

GCL GCL

Pada tanggal 27 Desember 2022, GCL, entitas On 27 December 2022, GCL, the associates of PIP,
asosiasi PIP, melalui Rapat Umum Pemegang through the General Meeting of Shareholders (“GMS”)
Saham (“RUPS”) No. 005/GMS-GCLIT/2022 telah No. 005/GMS-GCLIT/2022 has declared its dividends
mengumumkan dividen kepada PIT, entitas anak to PIT, the subsidiary of PIP, which amounted to
PIP, sebesar USD7.141.530 (setara dengan USD7,141,530 (equivalent to Rp111,013).
Rp111.013).

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, 2022, IP’s
saldo piutang PIP dari GCL masing-masing adalah principal outstanding loan balance from GCL was
sebesar USD4.694.783 (setara dengan Rp70.422) USD4,694,783 (equivalent to Rp70,422) and
dan USD4.516.530 (setara dengan Rp70.422). USD4,516,530 (equivalent to Rp70,422), respectively.

Manajemen Grup berpendapat bahwa penyisihan Management of the Group is of the opinion that the
atas kerugian kredit ekspektasian atas piutang pihak provision for expected credit losses of receivables
berelasi tidak material, sehingga penyisihan atas from related parties is not material, therefore, a
kerugian kredit ekspektasian dianggap tidak provision for expected credit losses is not considered
diperlukan pada 30 Juni 2023 dan 31 Desember necessary as at June 30, 2023 and December 31,
2022. 2022.

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for the information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.

PMSE PMSE

Pada tanggal 30 Juni 2023, saldo piutang pokok As at June 30, 2023, PMSE’s principal outstanding
pinjaman PMSE dari PJBIC adalah sebesar USD loan balance from PJBIC was USD663,000
663.000 (setara dengan Rp10.430) dan piutang (equivalent to Rp10,430) and balance of interest
bunga sebesar USD43.456 (setara dengan Rp652). receivables amounted to USD43,456 (equivalent to
Rp652).

Pada tanggal 31 Desember 2022, saldo piutang As at December 31, 2022, PMSE’s principal
pokok pinjaman PMSE dari PJBIC adalah sebesar outstanding loan balance from PJBIC was
USD663.000 (setara dengan Rp10.429) dan piutang USD663,000 (equivalent to Rp10,429) and balance of
bunga sebesar USD48.213 (setara dengan Rp752). interest receivables amounted to USD48,213
(equivalent to Rp752).
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/80 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

11. REKENING BANK DIBATASI PENGGUNAANNYA 11. RESTRICTED CASH IN BANKS

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Dana cadangan Reserve accounts


Sumitomo Mitsui Sumitomo Mitsui
Banking Corporation, Singapura Banking Corporation, Singapore
JPY 4,385,759 3,488,296 JPY
USD 825,702 851,029 USD
Jaminan bank garansi Bank guarantees
Pihak berelasi: Related parties:
PT Bank Rakyat Indonesia (Persero) PT Bank Rakyat Indonesia (Persero) Tbk
Tbk (“BRI”) (“BRI”)
Rupiah - 19,550 Rupiah
USD - 161,764 USD
PT Bank Mandiri (Persero) Tbk PT Bank Mandiri (Persero) Tbk
(“Bank Mandiri”) (“Bank Mandiri”)
Rupiah 29,013 62,023 Rupiah
USD - 112,262 USD
PT Bank Negara Indonesia (Persero) PT Bank Negara Indonesia (Persero) Tbk
Tbk (“BNI”) (“BNI”)
Rupiah 49 1,285 Rupiah
PT Bank Pembangunan Daerah PT Bank Pembangunan Daerah
Jawa Timur (“BPD Jatim”) Jawa Timur (“BPD Jatim”)
Rupiah - - Rupiah
Pihak ketiga: Third parties:
PT Bank KB Bukopin Tbk PT Bank KB Bukopin Tbk
(“Bank Bukopin”) (“Bank Bukopin”)
Rupiah 16,749 16,749 Rupiah
PT Bank CIMB Niaga Tbk PT Bank CIMB Niaga Tbk
(“CIMB Niaga”) (“CIMB Niaga”)
Rupiah 77,616 43,938 Rupiah

Subjumlah 5,334,888 4,756,896 Subtotal


Cadangan kerugian kredit ekspektasian (2) (2) Allowance for expected credit loss

Jumlah 5,334,886 4,756,894 Total


Dikurangi: bagian lancar 366 302,386 Less: current portion

Bagian tidak lancar 5,334,520 4,454,508 Non-current portion

Perusahaan menempatkan dana cadangan pada The Company established a reserve account with
Sumitomo Mitsui Banking Corporation, Singapura Sumitomo Mitsui Banking Corporation, Singapore
sebesar JPY41.973.163.289 dan USD55.046.822 amounting to JPY41,973,163,289 and
pada tanggal 30 Juni 2023 (2022: JPY29.572.853.747 USD55,046,822 as at June 30, 2023 (2022:
dan USD54.581.139) untuk memenuhi persyaratan JPY29,572,853,747 and USD54,581,139) to fulfil the
Financial Lease Agreement (Catatan 26). requirements of the Financial Lease Agreement (Note
26).
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/81 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

11. REKENING BANK DIBATASI PENGGUNAANNYA 11. RESTRICTED CASH IN BANKS (continued)
(lanjutan)

Jaminan bank garansi merupakan rekening bank yang Bank guarantees represent cash in banks and were
digunakan untuk jaminan pelaksanaan proyek dan used as collateral for projects and services provided by
pemberian jasa oleh Grup. the Group.
Rincian rekening bank dibatasi penggunaannya Details of restricted cash in banks in foreign currencies
dalam mata uang asing adalah sebagai berikut: are as follows:

30 Juni/ June 30, 31 Desember/ December 31,


2023 2022
Dalam mata Dalam mata
uang asing/ uang asing/
In foreign Ekuivalen Rp/ In foreign Ekuivalen Rp/
currencies*) Rp equivalent currencies*) Rp equivalent

JPY 41,973,163,289 4,385,759 29,572,853,747 3,488,296 JPY


USD 55,046,822 825,702 72,115,932 1,125,055 USD

Jumlah 5,211,461 4,613,351 Total


*) Dalam jumlah penuh *) In full amount

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.

12. ASET TIDAK LANCAR LAIN 12. OTHER NON-CURRENT ASSETS

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Properti pertambangan 1,915,451 1,858,369 Mining properties

Uang muka Advances


Pengembangan proyek 2,259,768 1,546,652 Project development
Pembelian batubara 15,349 33,833 Purchase of coal

Subjumlah 2,275,117 1,580,485 Subtotal

Biaya dibayar di muka Prepayments


Pembelian gas 98,012 98,012 Gas purchased
Lain-lain 292,609 169,983 Others

Subjumlah 390,621 267,995 Subtotal

Aset takberwujud Intangible assets


Piranti lunak 544,472 532,268 Software
Biaya legal terkait perpanjangan Legal costs for renewal
tanah dan hak atas tanah 357,746 398,124 of land rights

Subjumlah 902,218 930,392 Subtotal

Lain-lain 742,112 562,218 Others

Jumlah 6,225,519 5,199,459 Total

Manajemen Grup meyakini bahwa properti Management of the Group believes that the mining
pertambangan, uang muka, dan biaya dibayar di properties, advances, and prepayments are
muka dapat dipulihkan. recoverable.
Beban amortisasi aset takberwujud untuk periode Amortisation of intangible assets for the six-month
enam bulan yang berakhir pada tanggal 30 Juni periods ended June 30, 2023 and 2022 amounting to
2023 dan 2022, masing-masing sebesar Rp252,002 Rp252,002 and Rp160,578 respectively, is presented
dan Rp160.578 disajikan sebagai beban usaha lain- as part of other operating expenses (Note 44).
lain (Catatan 44).
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/82 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

13. KAS DAN SETARA KAS 13. CASH AND CASH EQUIVALENTS

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022
Kas 11,504 9,151 Cash on hand
Bank Cash in banks
Entitas yang berelasi dengan
Pemerintah Government related entities
BNI BNI
Rupiah 8,794,710 16,248,331 Rupiah
USD 2,228,543 1,640,073 USD
JPY 130,613 85,045 JPY
EUR 994 10,523 EUR
MYR 2,924 3,218 MYR
Bank Mandiri Bank Mandiri
Rupiah 7,694,453 14,105,086 Rupiah
USD 567,033 3,206,199 USD
MYR 2,289 88,331 MYR
JPY 9,208 61,154 JPY
EUR 31,050 42,912 EUR
BRI BRI
Rupiah 3,400,642 8,142,866 Rupiah
USD 1,971,288 2,233,337 USD
EUR 119,434 86,939 EUR
JPY 16,429 17,891 JPY
Bank Tabungan Negara (“BTN”) Bank Tabungan Negara (“BTN”)
Rupiah 418,395 750,486 Rupiah
PT Bank DKI (“Bank DKI”) PT Bank DKI (“Bank DKI”)
Rupiah 433,764 445,880 Rupiah
USD 42,972 44,624 USD
JPY 795 897 JPY
Bank Syariah Indonesia (“BSI”) Bank Syariah Indonesia (“BSI”)
Rupiah 228,927 608,292 Rupiah

Subjumlah 26,094,463 47,822,084 Subtotal


Cadangan kerugian kredit ekspektasian (7) (15) Allowance for expected credit losses
Jumlah entitas yang berelasi Total Government
dengan Pemerintah 26,094,456 47,822,069 related entities

Pihak ketiga Third parties


Bank Bukopin Bank Bukopin
JPY 31,092 35,171 JPY
Rupiah 20,853 11,238 Rupiah
USD 7,136 7,523 USD
PT Bank Danamon Indonesia Tbk PT Bank Danamon Indonesia Tbk
(“Bank Danamon”) (“Bank Danamon”)
Rupiah 453,158 441,546 Rupiah
PT Bank OCBC NISP Tbk PT Bank OCBC NISP Tbk
(“Bank OCBC NISP”) (“Bank OCBC NISP”)
Rupiah 410,831 298,861 Rupiah
PT Bank Central Asia Tbk PT Bank Central Asia Tbk
(“BCA”) (“BCA”)
Rupiah 250,907 170,344 Rupiah
PT Bank Maybank Indonesia Tbk PT Bank Maybank Indonesia Tbk
(“Bank Maybank Indonesia”) (“Bank Maybank Indonesia”)
(dahulu Bank Internasional (formerly Bank Internasional
Indonesia) Indonesia)
Rupiah 34,368 29,699 Rupiah
Lain-lain (masing-masing
dibawah 5% dari jumlah) Others (each below 5% of total)
USD 912,635 931,601 USD
Rupiah 163,285 169,087 Rupiah
Dinar 18,957 52,816 Dinar
EUR 7,896 7,993 EUR

Subjumlah 2,311,118 2,155,879 Subtotal


Cadangan kerugian kredit ekspektasian (2) (1) Allowance for expected credit losses

Jumlah pihak ketiga 2,311,116 2,155,878 Total third parties

w
Jumlah kas dan bank 28,417,076 49,987,098 Total cash on hand and in banks
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/83 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

13. KAS DAN SETARA KAS (lanjutan) 13. CASH AND CASH EQUIVALENTS (continued)

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Setara kas - deposito berjangka Cash equivalents - time deposits


Pihak berelasi Related parties
BNI BNI
Rupiah 188,402 173,955 Rupiah
USD - 268,244 USD
BRI BRI
Rupiah 897,500 542,600 Rupiah
USD 150,000 16,587 USD
Bank Mandiri Bank Mandiri
Rupiah 111,150 449,500 Rupiah
USD - - USD
BSI BSI
Rupiah 120,000 55,000 Rupiah

Jumlah pihak berelasi 1,467,052 1,505,886 Total related parties

Pihak ketiga Third parties


Bank Bukopin Bank Bukopin
Rupiah 10,000 10,000 Rupiah
Lain-lain Others
Rupiah 113 112 Rupiah

Jumlah pihak ketiga 10,113 10,112 Total third parties

Jumlah deposito berjangka 1,477,165 1,515,998 Total time deposits

Jumlah 29,894,241 51,503,096 Total

Tingkat bunga deposito berjangka Interest rate per annum on


per tahun time deposits
Rupiah 2.25% - 5.00% 2.25% - 5.00% Rupiah
USD 0.25% - 3.00% 0.25% - 3.00% USD
Jangka waktu 1 – 3 Bulan/Months 1 - 3 Bulan/Months Maturity

Rincian kas dan setara kas dalam mata uang asing Details of cash and cash equivalents in foreign
adalah sebagai berikut: currencies are as follows:

30 Juni/ June 30, 2023 31 Desember/ December 31, 2022


Dalam mata Dalam mata
uang asing/ uang asing/
In foreign Ekuivalen Rp/ In foreign Ekuivalen Rp/
currencies*) Rp equivalent currencies*) Rp equivalent

USD 391,972,629 5,879,607 535,414,834 8,348,188 USD


JPY 1,800,535,428 188,137 1,696,886,132 200,158 JPY
EUR 9,712,942 159,375 8,933,117 148,367 EUR
Lain-lain 1,611,327 24,170 9,258,917 144,365 Others

Jumlah 6,251,289 8,841,078 Total

*) Dalam jumlah penuh *) In full amount

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/84 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

14. INVESTASI JANGKA PENDEK 14. SHORT-TERM INVESTMENTS

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Deposito berjangka Time deposits


Pihak berelasi Related parties
BRI BRI
Rupiah 20,000 260,000 Rupiah
USD 13,687 37,527 USD
Bank Mandiri Bank Mandiri
Rupiah 200 303 Rupiah
USD 749,650 178,879 USD
BNI BNI
Rupiah 140,183 5,116 Rupiah
USD 106 31,462 USD

Jumlah pihak berelasi 923,826 513,287 Total related parties

Pihak ketiga Third parties


Bank Bukopin Bank Bukopin
Rupiah 10,000 10,000 Rupiah

Investasi lain-lain Other investments


Rupiah 11,244 10,045 Rupiah

Jumlah 945,070 533,332 Total

Tingkat bunga deposito berjangka Interest rate per annum on


per tahun time deposits
Rupiah 2.25% - 5.10% 2.25% - 5.55% Rupiah
USD 0.75% - 3.88% 0.75% - 3.00% USD
Jangka waktu Maturity
Rupiah 6 - 12 Bulan 6 - 12 Bulan Rupiah
/Months /Months
USD 6 - 12 Bulan 6 - 12 Bulan USD
/Months /Months

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.

15. PIUTANG USAHA 15. TRADE RECEIVABLES

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Pihak berelasi Related parties


Entitas yang berelasi dengan Pemerintah 2,244,150 2,347,650 Government related entities
Cadangan kerugian kredit ekspektasian (66,121) (89,250) Allowance for expected credit losses

Subjumlah 2,178,029 2,258,400 Subtotal

Pihak ketiga Third parties


Umum 27,194,454 25,306,846 Public
Tentara Nasional Indonesia dan Kepolisian Tentara Nasional Indonesia and
Negara Republik Indonesia Kepolisian Negara Republik Indonesia
(TNI dan POLRI) 753,359 662,136 (TNI and POLRI)

Subjumlah 27,947,813 25,968,982 Subtotal


Cadangan kerugian kredit ekspektasian (3,656,076) (3,470,100) Allowance for expected credit losses

Subjumlah 24,291,737 22,498,882 Subtotal

Jumlah, bersih 26,469,766 24,757,282 Total, net


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/85 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

15. PIUTANG USAHA (lanjutan) 15. TRADE RECEIVABLES (continued)

Analisis umur piutang usaha adalah sebagai berikut: The aging analysis of trade receivables is as follows:

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Belum jatuh tempo 24,745,083 23,571,376 Not yet due


Lewat jatuh tempo Past due
1 s/d 30 hari 767,869 334,516 1 to 30 days
31 s/d 60 hari 488,249 275,833 31 to 60 days
61 s/d 360 hari 1,212,168 326,072 61 to 360 days
Lebih dari 360 hari 2,978,593 3,808,835 More than 360 days

Jumlah 30,191,962 28,316,632 Total

Pergerakan perubahan cadangan kerugian The movement of changes in the allowance for
penurunan nilai adalah sebagai berikut: impairment losses is as follows:

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Saldo awal 3,559,350 3,228,195 Balance at beginning


Penambahan 162,860 335,322 Additions
Penghapusan (13) (4,167) Write-off

Saldo akhir 3,722,197 3,559,350 Ending balance

Piutang usaha Perusahaan dan PLN Batam dijamin The Company and PLN Batam’s trade receivables are
dengan uang jaminan langganan jika terjadi secured by customer security deposits in case of
kegagalan pembayaran (Catatan 34). default (Note 34).

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, 2022, all
seluruh nilai tercatat piutang usaha berdominasi carrying amounts of the Group’s trade receivables
Rupiah. were dominated in Rupiah.

Pada tanggal 30 Juni 2023, sebagian dari piutang As at June 30, 2023, some of the trade receivables of
usaha sebesar Rp30.191.962 mengalami penurunan Rp30,191,962 were impaired and have been
nilai dan telah diprovisikan sebesar Rp3.722.197. provisioned by Rp3,722,197. The impaired trade
Piutang usaha yang diturunkan nilainya terutama receivables mainly relate to public customers who
terkait dengan pelanggan umum yang belum have not paid the receivables for more than three
melakukan pembayaran piutang lebih dari tiga months.
bulan.

Manajemen berkeyakinan bahwa tidak ada risiko Management believes there is no heightened risk of
kredit kualitas yang buruk atas piutang usaha poor credit quality of trade receivables because the
karena Grup memiliki jumlah pelanggan yang besar, Group has a broad customer base, dispersed across
tersebar mencakup segmen pasar dan area varying market segments and geographic locations
geografis yang luas di seluruh Indonesia. throughout Indonesia. This assessment is also
Kesimpulan ini didukung juga oleh data historis supported by the Group’s good historical collection
kolektibilitas Grup atas piutang usaha yang baik rates of trade receivables across the periods.
selama beberapa periode. Oleh karena itu, Therefore, management is of the opinion that the
manajemen berpendapat bahwa cadangan atas allowance for expected credit loss of trade receivables
kerugian kredit ekspektasian atas piutang usaha is adequate.
adalah cukup.

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/86 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

16. PIUTANG DARI PEMERINTAH 16. RECEIVABLES FROM GOVERNMENT

Piutang dari Pemerintah terdiri atas piutang Receivables from Government consists of
kompensasi, piutang subsidi listrik dan kekurangan compensation receivables, electricity subsidy
bayar atas stimulus COVID-19 kepada Grup. receivables and underpayment of COVID-19 stimulus
to the Group.

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Piutang kompensasi 37,879,403 16,793,172 Compensation receivables


Receivables for electricity
Piutang subsidi listrik (Catatan 37) 10,649,195 4,677,328 subsidy (Note 37)
Dampak nilai waktu uang - - Time value of money impact

10,649,195 4,677,328

Piutang stimulus COVID-19 - - COVID-19 stimulus receivables

Jumlah 48,528,598 21,470,500 Total

Dikurangi: bagian lancar 45,940,660 18,882,562 Less: current portion

Bagian tidak lancar 2,587,938 2,587,938 Non-current portion

Piutang kompensasi Compensation receivables

Piutang kompensasi merupakan piutang atas Compensation receivables represents receivables of


pendapatan kompensasi dari Pemerintah yang compensation revenue from the Government which
belum diterima untuk penggantian perbedaan tarif not yet received for the difference between the actual
aktual dan tarif yang dihitung oleh Grup. Sejak tahun tariffs charged versus the tariffs calculated by the
2017, Grup selalu menerima keputusan tarif tetap Group. Since 2017, the Group has always accepted
dari Pemerintah. Dengan kata lain, perhitungan the fixed electricity tariff decision from the
yang dilakukan oleh Grup terkait tarif listrik tidak Government. In other words, the calculation of the
disetujui oleh Kementerian ESDM. Grup diharuskan electricity tariff proposed by the Group was not
menggunakan tarif listrik tetap yang sudah disetujui approved by the Ministry of ESDM. The Group was
atau tarif aktual. required to use a fixed electricity tariff which has been
approved or actual tariff.

Berdasarkan surat BPKP No. SP-137/D4/04/2022 Based on letter from BPKP No. SP-137/D4/04/2022
tanggal 8 Februari 2022 kepada Menteri Keuangan, dated February 8, 2022 to the Minister of Finance,
disampaikan penggantian biaya pokok penyediaan the reimbursement for cost of electricity supply in the
dalam bentuk kompensasi dari Pemerintah atas form of Government compensation for potential loss
kehilangan potensi pendapatan tenaga listrik untuk of electricity income for non-subsidy tariff groups for
golongan tarif non-subsidi tahun 2021 sebesar the year 2021 amounted to Rp24,594,425. The
Rp24.594.425. Grup telah menerima pembayaran Group has received full payment of the 2021
piutang kompensasi tahun 2021 secara penuh pada compensation receivables on July 1, 2022.
tanggal 1 Juli 2022.

Pada tanggal 17 Mei 2023, BPK menyampaikan On January 17, 2023, BPK submitted an LHP
LHP No. 4/S/IX-XX/01/2023 atas perhitungan No. 4/S/IX-XX/01/2023 for the calculation of
kompensasi tahun 2021. Berdasarkan LHP tersebut, compensation in 2021. Based on the LHP, the amount
nilai dana kompensasi pada tahun 2021 sebesar of the compensation in 2021 amounted to
Rp23.918.440 sehingga terdapat kelebihan Rp23,918,440, so there was an excess of 2021
penerimaan kompensasi tahun 2021 yang diterima compensation received by the Group amounting to
oleh Grup sebesar Rp675.985. Kelebihan Rp675,985. The excess compensation is recorded as
penerimaan tersebut dicatat sebagai utang kepada payable to Government in the consolidated statement
Pemerintah pada laporan posisi keuangan of financial position (Note 25) and deducting the
konsolidasian (Catatan 25) dan mengurangi compensation income in the current year.
pendapatan kompensasi tahun berjalan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/87 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

16. PIUTANG DARI PEMERINTAH (lanjutan) 16. RECEIVABLES FROM GOVERNMENT (continued)

Piutang kompensasi (lanjutan) Compensation receivables (continued)

Berdasarkan PMK No. 159/PMK.02/2022, Based on PMK No. 159/PMK.02/2022, the Company
Perusahaan mencatat pendapatan dan piutang records compensation income and receivables in
kompensasi sesuai dengan asersi manajemen dan accordance with management estimates and they will
akan ditetapkan sebagai kebijakan dana be finally determined based on the compensation fund
kompensasi oleh Menteri Keuangan berdasarkan policy by the Minister of Finance based on the results
hasil reviu oleh BPKP. Finalisasi kebijakan dana of the review by BPKP. Finalisation of the
kompensasi tersebut akan dilakukan berdasarkan compensation fund policy will be made based on the
LHP BPK. Perbedaan yang timbul dari hasil audit LHP of the BPK. Any differences from the audit of BPK
BPK akan mempengaruhi laba rugi pada tahun audit will impact profit or loss in the year the audit is
tersebut difinalisasi. finalised.
Berdasarkan surat BPKP No. PE.12.03/S- Based on letter from BPKP No. PE.12.03/S-
196/D4/04/2023 tanggal 17 Februari 2023 kepada 196/D4/04/2023 dated February 17, 2023 to the
Menteri Keuangan, disampaikan penggantian biaya Minister of Finance, the reimbursement for cost of
pokok penyediaan dalam bentuk kompensasi dari electricity supply in the form of Government
Pemerintah atas kehilangan potensi pendapatan compensation for potential loss of electricity income
tenaga listrik untuk golongan tarif non-subsidi tahun for non-subsidy tariff groups for the year 2022
2022 sebesar Rp64.325.806. amounts to Rp64,325,806.

Berdasarkan Berita Acara Hasil Pemeriksaan Based on Minutes of Audit and calculation of
perhitungan dana kompensasi listrik tahun 2022 electricity compensation for fiscal year 2022 issued
yang diterbitkan oleh BPK tanggal 17 Mei 2023, nilai by BPK on May 17, 2023, the amount of the
dana kompensasi pada tahun 2022 sebesar compensation in 2022 amounted to Rp64,303,425.
Rp64.303.425. Selama tahun 2022, Grup telah During 2022, Group has received payments of 2022
menerima pembayaran kompensasi tahun 2022 compensation amounted to Rp47,532,634 and during
sebesar Rp47.532.634 dan selama periode enam six-month periods ended June 30, 2023, the Group
bulan yang berakhir pada tanggal 30 Juni 2023, has received underpayments of compensation in 2022
Grup telah menerima kekurangan pembayaran amounted Rp16,770,789, with details of cash receipts
kompensasi tahun 2022 sebesar Rp16.770.789 amounted to Rp16,094,804 and set off with the excess
dengan rinciannya diterima kas sebesar of 2021 compensation received from the Government
Rp16.094.804 dan dan set off dengan kelebihan of Rp675,985.
penerimaan kompensasi tahun 2021 dari
Pemerintah sebesar Rp675.985.

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.

17. PIUTANG LAIN-LAIN 17. OTHER RECEIVABLES

30 Juni 31 Desember/
June 30, December 31.
2023 2022

Karyawan 968,426 999,945 Employees


Lain-lain 2,394,566 1,716,894 Others

Jumlah 3,362,992 2,716,839 Total

Dikurangi: bagian lancar 1,860,308 1,368,707 Less: current portion

Bagian tidak lancar 1,502,684 1,348,132 Non-current portion

Piutang karyawan merupakan pinjaman kepemilikan Receivables from employees represent housing loans,
rumah yang pelunasannya dilakukan melalui which are paid monthly through salary deduction.
pemotongan gaji.

Piutang untuk lain-lain sebagian besar terdiri dari Receivables from others mostly consist of receivables
piutang dari vendor yang akan dilunasi dengan from vendors which will be settled through cash
pembayaran tunai atau pemotongan tagihan vendor. repayments or deduction of vendor invoices
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/88 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

18. PERSEDIAAN 18. INVENTORIES

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Batubara, bahan bakar dan pelumas 11,570,268 11,972,336 Coal, fuel and lubricants
Persediaan umum 3,492,485 3,898,455 General supplies
Switchgear dan jaringan 835,337 1,008,205 Switchgear and network
Meter recording devices,
Alat ukur, pembatas dan kontrol 736,520 810,853 circuit breaker, and control equipment
Transformator 82,463 106,136 Transformers
Kabel 158,522 98,706 Cables
Biomassa 67,111 19,741 Biomassa

Jumlah 17,379,171 17,914,432 Total


Cadangan kerugian penurunan nilai Allowance for decline in value of
dan persediaan usang (401,641) (379,628) inventories and inventory obsolescence

Jumlah, bersih 16,977,530 17,534,804 Total, net

Pergerakan perubahan cadangan kerugian The movement of changes in allowance for decline in
penurunan nilai dan persediaan usang adalah value of inventories and inventory obsolescence is as
sebagai berikut: follows:

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Saldo awal 379,628 114,566 Beginning balance

Penambahan 22,013 265,062 Additions

Saldo akhir 401,641 379,628 Ending balance

Grup tidak mengasuransikan persediaan untuk The Group does not have any insurance to cover the
menutup risiko atas kemungkinan kerugian yang possible losses on inventories except for coal stock in
timbul pada persediaan kecuali persediaan batubara Unit Tanjung Jati B which were insured to PT Asuransi
di Unit Tanjung Jati B yang diasuransikan kepada Mitsui Sumitomo Indonesia against fire and other
PT Asuransi Mitsui Sumitomo Indonesia terhadap possible risks with insurance coverage of
risiko kebakaran dan risiko lainnya dengan jumlah JPY3,000,000,000 (full amount) or equivalent to
pertanggungan sebesar JPY3.000.000.000 (nilai Rp337,307 (2022: JPY3,000,000,000 (full amount) or
penuh) atau setara dengan Rp337.307 (2022: equivalent to Rp353,868). The Group’s management
JPY3.000.000.000 (nilai penuh) atau setara dengan believes that the inventories were adequately insured
Rp353.868). Manajemen Grup berpendapat bahwa as at June 30, 2023 and December 31, 2022.
persediaan tersebut telah diasuransikan secara
memadai pada tanggal 30 Juni 2023 dan 31
Desember 2022.

Jumlah persediaan yang diakui sebagai beban untuk The total amount of inventories recognised as
periode enam bulan yang berakhir pada tanggal 30 expenses for the six-month periods ended June 30,
Juni 2023 dan 2022 adalah masing-masing sebesar 2023 and 2022 amounted to Rp51,101,113 and
Rp51.101.113 dan Rp48.162.586. Rp48,162,586, respectively.

Manajemen berpendapat bahwa penyisihan yang Management believes that the allowance is adequate
ditetapkan memadai untuk menutup risiko to cover possible losses on the decline in value of
penurunan nilai persediaan dan persediaan usang. inventories and inventory obsolescence.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/89 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

19. PAJAK DIBAYAR DI MUKA 19. PREPAID TAXES


30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Pajak Pertambahan Nilai (“PPN”) 1,672,574 1,237,310 Value-Added Tax (“VAT”)


Pajak Penghasilan Badan (“PPh”) Overpayment of Corporate Income
lebih bayar Tax (“CIT”)
PPh Badan CIT
2023 690,193 - 2023
2022 312,156 889,399 2022
2021 217,260 537,168 2021
2020 149,245 18,554 2020
2019 - 210,830 2019
Lebih bayar PPh Overpayment of income tax
Pasal 26 118,450 678,532 Article 26
PPh Pasal 25 44,324 - income tax Article 25
Bea meterai 80,935 45,200 Stamp duty
PBB 25 - Property Tax
Pembayaran di muka atas
Surat Ketetapan Pajak Prepayments of Tax Assessment Letters
Kurang Bayar (Catatan 47.c) 14,926,492 15,693,765 for Underpayment (Note 47.c)
Jumlah 18,211,654 19,310,758 Total
Provisi atas ketidakpastian Provision against uncertain
posisi pajak (5,945,235) (4,434,631) tax treatment

Jumlah, bersih 12,266,419 14,876,127 Total, net

Dikurangi: bagian lancar 2,519,852 3,524,488 Less: current portion

Bagian tidak lancar 9,746,567 11,351,639 Non-current portion

Pada tahun 2022, PLN menerima surat persetujuan In 2022, PLN received a letter of approval for the
pemindahbukuan kelebihan bayar PPh Pasal 26 overpayment of Article 26 PPh amounting to Rp
sebesar Rp678.532 dari Direktorat Jenderal Pajak 678,532 from Directorate General of Taxation (“DJP”)
(“DJP”) untuk pembayaran pajak di 2023. for tax payments in 2023.

Lihat Catatan 47 untuk informasi mengenai beban Refer to Note 47 for income tax expense information
pajak penghasilan dan surat ketetapan pajak. and tax assessment letters.

20. BIAYA DIBAYAR DI MUKA DAN UANG MUKA 20. PREPAID EXPENSES AND ADVANCES

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Biaya dibayar di muka Prepaid expenses


Premi asuransi 286,422 53,008 Insurance
Sewa 136,433 27,002 Rent

Subjumlah 422,855 80,010 Subtotal

Uang muka Advances


Proyek 233,698 288,412 Projects
Pembelian barang 134,291 261,301 Purchases of goods
Pembelian bahan bakar 314 356 Purchases of fuel
Lain-lain 4,125 73,479 Others

Subjumlah 372,428 623,548 Subtotal

Aset kontrak 127,434 112,460 Contract assets

Jumlah 922,717 816,018 Total

Dikurangi: bagian lancar 451,704 646,651 Less: current portion

Bagian tidak lancar 471,013 169,367 Non-current portion


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/90 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

21. MODAL SAHAM DAN SALDO LABA 21. CAPITAL STOCK AND RETAINED EARNINGS

Modal saham Capital stock

Seluruh saham Perusahaan dimiliki oleh Pemerintah The Company’s shares of stock are fully owned by
Republik Indonesia. the Government of the Republic of Indonesia.

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, 2022, the
Perusahaan mempunyai modal dasar masing- Company has authorised capital amounted to
masing sebesar Rp439.000.000 yang terbagi atas Rp439,000,000, consisting of 439,000,000 shares,
439.000.000 saham dengan nilai nominal Rp1 per with par value of Rp1 per share.
saham.

Berdasarkan surat Menteri BUMN S- Based on letter of the Minister of SOE No. S-
106MBU/02/2022 tanggal 14 Februari 2022, 106/MBU/02/2022 dated February 14, 2022 the
pernyataan Keputusan Menteri BUMN sebagai decision of the Minister of SOE as the GMS approved
RUPS menyetujui penambahan penyertaan modal additional Government equity participation of
Negara sebesar 10.075.210 saham dengan nilai 10,075,210 shares for a value of Rp10,075,210,
Rp10.075.210 sehingga meningkatkan modal thereby increasing the subscribed and paid-up capital
ditempatkan dan disetor menjadi Rp145.536.096. to Rp145,536,096. Following the approval of the
Atas persetujuan Penyertaan Modal Negara Government Participation, the stock subscription from
tersebut, maka penyertaan modal Negara dalam the Government in the issuance process (Note 22b)
proses penerbitan saham (Catatan 22b) has therefore been reclassified to subscribed and
direklasifikasi ke modal ditempatkan dan disetor. paid-in capital.

Saldo laba Retained earnings

Saldo laba terdiri dari sebagai berikut: Retained earnings consists of the following:

i. Saldo laba yang ditentukan penggunaannya i. Appropriated retained earnings

Berdasarkan Undang-Undang Perseroan Under Indonesian Limited Company Law, the


Terbatas, Perusahaan diharuskan untuk Company is required to establish a statutory
membuat penyisihan cadangan wajib hingga reserve amounting to at least 20% of the
sekurang-kurangnya 20% dari jumlah modal Company’s subscribed and paid-up capital.
yang ditempatkan dan disetor penuh.

Berdasarkan RUPS tahun 2022 No. Based on RUPS for the year 2022 No. RIS-
0164.K/DIR/2023 pada tanggal 7 Juni 2023, 0164.K/DIR/2023 dated June 7, 2023, an
terdapat saldo laba tahun 2022 yang ditetapkan appropriation from the 2022 retained earnings
sebagai cadangan umum sebesar amounted to Rp12,146,040 was approved.
Rp12.146.040.

ii. Saldo laba yang belum ditentukan ii. Unappropriated retained earnings
penggunaannya

Pada tanggal 30 Juni 2023 dan 31 Desember As at June 30, 2023 and December 31, 2022, the
2022, saldo laba yang belum ditentukan balance of the unappropriated retained earnings
penggunaannya masing-masing sebesar amounted to Rp110,999,724 and Rp99,438,371,
Rp110.999.724 dan Rp99.438.371. respectively.

Dividen Dividends

Berdasarkan hasil keputusan RUPS tahun 2021 Based on the decision of the GMS for the year 2021
No. 0223.K/DIR2022 yang diadakan pada tanggal No. 0223.K/DIR2022 on June 27, 2022, the
27 Juni 2022, pemegang saham menyetujui shareholders agreed to distribute cash dividends from
pembagian dividen tunai final untuk tahun 2021 2021 net income amounting to Rp750,000. This cash
sejumlah Rp750.000. Dividen tunai final tahun 2021 dividends for 2021 were paid on July 27, 2022.
ini telah dibayarkan pada tanggal 27 Juli 2022.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/91 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

21. MODAL SAHAM DAN SALDO LABA (lanjutan) 21. CAPITAL STOCK AND RETAINED EARNINGS
(continued)

Dividen (lanjutan) Dividends (continued)

Berdasarkan hasil keputusan RUPS tahun 2022 Based on the decision of the GMS for the year 2021
0164.K/DIR/2023 yang diadakan pada tanggal 7 No. 0223.K/DIR2022 on June 7, 2023, the
Juni 2023, pemegang saham menyetujui pembagian shareholders agreed to distribute cash dividends from
dividen tunai final untuk tahun 2022 sejumlah 2022 net income amounting to Rp2,188,000. This
Rp2.188.000. Dividen tunai final tahun 2022 ini telah cash dividends for 2022 were paid on July 6, 2023.
dibayarkan pada tanggal 6 Juli 2023.

22. TAMBAHAN MODAL DISETOR DAN 22. ADDITIONAL PAID-IN CAPITAL AND STOCK
PENYERTAAN MODAL NEGARA DALAM SUBSCRIPTION FROM GOVERNMENT IN
PROSES PENERBITAN SAHAM ISSUANCE PROCESS

a. Tambahan modal disetor a. Additional paid-in capital

Tambahan modal disetor pada tanggal 30 Juni Additional paid-in capital as at June 30, 2023
2023 terdiri dari selisih nilai transaksi consists of the difference in restructuring
restrukturisasi entitas sepengendali dan aset transactions between entities under common
yang dibukukan dan sebagai akibat control and the assets booked as a result of the
keikutsertaan Perusahaan dalam pengampunan Company’s participation in the tax amnesty
pajak, dengan rincian sebagai berikut: program with the following details:

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Selisih nilai transaksi restrukturisasi Difference in restructuring transactions


entitas sepengendali (106,753) (106,753) between entities under common control
Aset pengampunan pajak 141,361 141,361 Tax amnesty assets

Jumlah 34,608 34,608 Total

Bantuan proyek merupakan bantuan luar negeri Project aid represents overseas aid for electricity
untuk bidang kelistrikan yang diteruskan projects, which was channelled by the
Pemerintah Republik Indonesia kepada Government of the Republic of Indonesia to the
Perusahaan. Company.

DIPA merupakan penerimaan dari Pemerintah The LPF represents electricity projects received
Republik Indonesia dalam bentuk proyek from the Government of the Republic of Indonesia
kelistrikan melalui Kementerian ESDM. through the Ministry of ESDM.

Jumlah aset yang didonasikan oleh Pemerintah The total amount of assets donated by the
Republik Indonesia telah dicatat sebagai Government of the Republic of Indonesia has
penambahan aset. been recognised as additions of assets.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/92 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

22. TAMBAHAN MODAL DISETOR DAN 22. ADDITIONAL PAID-IN CAPITAL AND STOCK
PENYERTAAN MODAL NEGARA DALAM SUBSCRIPTION FROM GOVERNMENT IN
PROSES PENERBITAN SAHAM (lanjutan) ISSUANCE PROCESS (continued)

b. Penyertaan modal negara dalam proses b. Stock subscription from Government in


penerbitan saham issuance process

Pada tahun 2022, penyertaan modal negara In 2022, stock subscription from Government in
dalam proses penerbitan saham sebesar issuance process amounting to Rp10,075,210
Rp10.075.210 telah direklasifikasi sebagai has been reclassified to share capital (see Note
modal saham (lihat Catatan 21). 21).

Berdasarkan Peraturan Pemerintah Republik Based on Government Regulation No. 27 year


Indonesia No. 27 tahun 2022, tanggal 31 2022, dated August 31, 2022, the additions of
Agustus 2022, penambahan penyertaan modal stock subscription from the Government in cash
negara secara tunai yang masih dalam proses which is still in the issuance process amounted to
penerbitan saham adalah sebesar Rp5.000.000. Rp5,000,000.

23. PENDAPATAN DITANGGUHKAN 23. DEFERRED REVENUE

Akun ini merupakan penerimaan dari pelanggan This account represents connection fees received
berupa jasa penyambungan dan diakui sepanjang from customers and recognised over time by the
waktu oleh Grup dengan rincian sebagai berikut: Group. Details of the deferred revenue are as follows:

30 Juni/ 31 Desember/
June 30, December 31.
2023 2022

Saldo awal 21,203,504 14,011,962 Beginning balance


Penambahan 4,638,239 8,049,010 Additions
Diakui sebagai pendapatan Recognised as revenue
tahun berjalan (584,331) (857,468) during the year

Saldo akhir 25,257,412 21,203,504 Ending balance

Dikurangi: bagian jangka pendek 1,375,269 1,143,357 Less: current portion

Bagian jangka panjang 23,882,143 20,060,147 Long-term portion

Biaya penyambungan diamortisasi sejak tanggal Connection fees are amortised starting from the
penyambungan sesuai masa estimasi konsumsi connection date based on the estimated consumption
pelanggan. pattern of the customer.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/93 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN 24. TWO-STEP LOANS

Akun ini merupakan pinjaman luar negeri This account represents overseas, collateral-free
Pemerintah Republik Indonesia yang tidak diikat loans of the Government of the Republic of Indonesia
jaminan dan diteruskan kepada Perusahaan untuk which are passed on to the Company to finance its
membiayai proyek-proyek Perusahaan. Rincian projects. The details of the two-step loans are as
penerusan pinjaman adalah sebagai berikut: follows:
30 Juni/ 31 Desember
June 30, December 31, Periode/
2023 2022 Period*)

International Bank for Reconstruction


and Development (“IBRD”)
USD
IBRD - 7940 IND - 1238 2,216,300 2,377,127 2011 - 2034
IBRD - 8280 ID - 1256 1,361,257 1,462,789 2014 - 2034
IBRD - 8057 IND - 1244 466,524 498,787 2012 - 2035
IBRD - 7905 IND - 1235 227,514 244,023 2010 - 2034

Asian Development Bank (“ADB”)


USD
ADB - 1982 INO - 1170 1,002,021 1,131,614 2004 - 2027
ADB - 1983 INO - 1171 680,593 768,615 2004 - 2027
ADB - 3015 INO - 1255 527,699 569,475 2014 - 2033
ADB - 2619 INO - 1236 473,987 503,237 2010 - 2035
ADB - 3083 INO - 1257 202,337 217,872 2014 - 2033
ADB - 8276 INO - 1258 22,401 24,120 2014 - 2033

Kreditanstalt Fur Wiederaufbau, Jerman (“KfW”)


EUR
KfW F 26180 - 1262 149,032 163,421 2019 - 2029

Japan Bank for International Cooperation


(d/h The Export-Import Bank of Japan)
JPY
JICA IP 515 - 1177 3,173,238 3,745,025 2004 - 2034
JICA IP 512 - 1163 2,898,084 3,427,373 2004 – 2033
JICA IP 532 - 1214 2,474,862 2,766,481 2006 - 2048
JICA IP 538 - 1221 2,130,715 2,455,428 2009 - 2047
JICA IP 525 - 1197 1,211,085 1,398,239 2005 - 2045
JICA IP 513 - 1164 884,486 1,046,024 2004 - 2033
JICA IP 527 - 1211 739,648 862,805 2007 - 2037
JICA IP 539 - 1222 716,933 838,234 2009 - 2037
JICA IP 560 - 1253 376,476 432,090 2013 - 2053
JICA IP 517 - 1178 347,798 401,969 2004 - 2044
JICA IP 555 - 1231 93,811 106,587 2013 - 2039
JICA IP 561 - 1252 74,192 85,154 2013 - 2053
JICA IP 526 - 1198 51,055 58,945 2005 - 2045
JICA IP 516 - 1196 40,169 46,425 2004 - 2044
JICA IP 572 - 1265 36,296 40,974 2016 - 2055
JICA IP 537 - 1220 4,860 5,682 2009 - 2037

Kerajaan Belgia/Kingdom of Belgium


EUR
Kerajaan Belgia/Kingdom of Belgium - 1185 20,388 20,637 2005 - 2033

China Exim Bank


USD
China Exim Bank - 1261 3,319,612 3,697,100 2015 - 2029
China Exim Bank - 1260 2,245,428 2,513,589 2015 - 2029
China Exim Bank - 1248 763,450 872,938 2013 - 2027

*) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/94 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN (lanjutan) 24. TWO-STEP LOANS (continued)

30 Juni/ 31 Desember
June 30, December 31, Periode/
2023 2022 Period*)

Agence Francaise de Developpement (“AFD”)


USD
AFD CID 1024 01B - 1254 270,544 309,344 2013 - 2028
AFD CID 1039 01H - 1259 71,110 81,307 2014 - 2026
AFD CID 1019 01H - 1237 39,733 51,626 2010 - 2035

Jumlah/Total 29,313,638 33,225,056

Biaya transaksi belum diamortisasi/Unamortised transaction costs (35,559) (40,342)

Jumlah, bersih/Total, net 29,278,079 33,184,714

Dikurangi/less: bagian jatuh tempo dalam


satu tahun/current maturities
IBRD
USD
IBRD - 7940 IND - 1238 146,333 148,417 2011 - 2034
IBRD - 8280 ID - 1256 95,618 96,928 2014 - 2034
IBRD - 8057 IND - 1244 27,624 28,039 2012 - 2035
IBRD - 7905 IND - 1235 15,022 15,235 2010 - 2034

ADB
USD
ADB - 1982 INO - 1170 186,321 184,620 2004 - 2027
ADB - 1983 INO - 1171 126,553 125,398 2004 - 2027
ADB - 3015 INO - 1255 41,832 42,423 2014 - 2033
ADB - 2619 INO - 1236 21,834 21,615 2010 - 2035
ADB - 3083 INO - 1257 15,073 15,286 2014 - 2033
ADB - 8276 INO - 1258 1,669 1,692 2014 - 2033

KfW
EUR
KfW F 26180 - 1262 24,839 25,142 2019 - 2029

Japan Bank for International Cooperation


(d/h The Export-Import Bank of Japan)
JPY
JICA IP 515 - 1177 288,476 325,654 2004 - 2034
JICA IP 512 - 1163 276,008 311,579 2004 - 2033
JICA IP 532 - 1214 118,110 133,336 2006 - 2048
JICA IP 538 - 1221 88,780 100,222 2009 - 2047
JICA IP 513 - 1164 84,237 95,093 2004 - 2033
JICA IP 525 - 1197 55,049 62,144 2005 - 2045
JICA IP 539 - 1222 51,210 57,809 2009 - 2037
JICA IP 527 - 1211 49,310 55,665 2007 - 2037
JICA IP 560 - 1253 12,541 19,747 2013 - 2053
JICA IP 517 - 1178 16,562 18,696 2004 - 2044
JICA IP 561 - 1252 2,473 6,682 2013 - 2053
JICA IP 526 - 1198 2,321 2,620 2005 - 2045
JICA IP 516 - 1196 1,913 2,159 2004 - 2044
JICA IP 555 - 1231 1,823 1,372 2013 - 2039
JICA IP 537 - 1220 347 392 2009 - 2037

Kerajaan Belgia/Kingdom of Belgium


EUR
Kerajaan Belgia/Kingdom of Belgium - 1185 1,853 1,876 2005 - 2033

*) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/95 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN (lanjutan) 24. TWO-STEP LOANS (continued)


30 Juni/ 31 Desember
June 30, December 31, Periode/
2023 2022 Period*)

China Exim Bank


USD
China Exim Bank - 1261 474,230 492,947 2015 - 2029
China Exim Bank - 1260 345,450 359,084 2015 - 2029
China Exim Bank - 1248 152,690 158,716 2013 - 2027

AFD
USD
AFD CID 1024 01B - 1254 54,109 56,244 2013 - 2028
AFD CID 1019 01F - 1237 19,865 20,649 2010 - 2035
AFD CID 1039 01H - 1259 14,222 14,783 2014 - 2026

Bagian jatuh tempo dalam satu tahun/Current portion 2,814,297 3,002,264

Bagian jangka panjang/Non-current portion 26,463,782 30,182,450

*) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Tingkat suku bunga per tahun Interest rate per annum


USD 2.88% - 6.95% 0.81% - 6.36% USD
JPY 0.012% - 2.65% 0.012% - 3.31% JPY
EUR 0.35% - 2.35% 0.35% - 2.35% EUR
AUD - 3.85% AUD
GBP - 3.69% GBP

Perusahaan melakukan pembayaran pokok dan The Company made payments of principal and
bunga penerusan pinjaman sesuai dengan jadwal interest on the two-step loans in accordance with the
pembayaran dalam perjanjian penerusan pinjaman schedule of payment within the agreements of the two-
yang berlaku pada tanggal laporan. step loans as at the reporting date.

Rincian saldo penerusan pinjaman dalam mata uang Details of the two-step loans balance in foreign
asing adalah sebagai berikut: currencies are as follows:

30 Juni/ June 30, 31 Desember/ December 31,


2023 2022
Dalam mata Dalam mata
uang asing/ uang asing/
In foreign Ekuivalen Rp/ In foreign Ekuivalen Rp/
currencies*) Rp equivalent currencies*) Rp equivalent

USD 926,033,944 13,890,509 982,783,614 15,323,563 USD


JPY 145,983,023,000 15,253,708 150,203,772,818 17,717,435 JPY
EUR 10,325,171 169,421 11,082,057 184,058 EUR
Lain-lain**) - - - - Others **)

Jumlah 29,313,638 33,225,056 Total

*) Dalam jumlah penuh *) In full amount


**) Penerusan pinjaman dalam mata uang asing lainnya disajikan **) Two-step loans denominated in other foreign currencies are
dalam jumlah setara USD menggunakan kurs tanggal presented as USD equivalents using the exchange rates
pelaporan prevailing at the reporting date
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/96 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

25. UTANG KEPADA PEMERINTAH DAN LEMBAGA 25. GOVERNMENT AND NON-BANK GOVERNMENT
KEUANGAN PEMERINTAH NON-BANK FINANCIAL INSTITUTION LOANS

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

PT Sarana Multi Infrastruktur 2,588,424 2,952,823 PT Sarana Multi Infrastruktur


Pengembalian kompensasi (Catatan 16) - 675,985 Excess of compensation (Note 16)
Dividen ke Pemerintah 2,188,000 - Dividens to the Government

Jumlah 4,776,424 3,628,808 Total

Dikurangi: bagian jatuh tempo dalam


satu tahun 2,938,000 1,425,985 Less: current portion

Bagian jangka panjang 1,838,424 2,202,823 Long-term portion

Tingkat suku bunga per tahun Interest rate per annum


Rupiah 5.25%___ 5.25% Rupiah

PT Sarana Multi Infrastruktur PT Sarana Multi Infrastruktur

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Pokok pinjaman 2,625,000 3,000,000 Principal


Biaya transaksi yang belum
diamortisasi (3,441) (4,444) Unamortised transaction cost
Perbedaan nilai wajar (33,135) (42,733) Fair value difference

Jumlah 2,588,424 2,952,823 Total

Pada tanggal 13 Desember 2011, Perusahaan On December 13, 2011, the Company obtained a soft
memperoleh fasilitas pinjaman lunak dari Pusat loan facility from the Government Investment Center
Investasi Pemerintah (“PIP”) Kementerian Keuangan (“PIP”) under the Ministry of Finance of the Republic of
Republik Indonesia sebesar Rp7.500.000, dengan Indonesia amounting to Rp7,500,000 with an annual
tingkat bunga 5,25% per tahun berjangka waktu 15 interest rate of 5.25% with a 15-year term.
tahun.

Pinjaman ini digunakan untuk membiayai This loan was used to finance the procurement and
pengadaan dan penggantian trafo, instalasi replacement of transformers, the equipment
perlengkapan transmisi dan distribusi serta investasi installation of transmission and distribution and also
lainnya. other capital expenditures.

Pada tanggal 23 Desember 2015, telah On December 23, 2015, PIP and PT Sarana Multi
dilaksanakan penandatanganan perjanjian Infrastruktur (“SMI”) signed a novation agreement
pengalihan antara PIP dan PT Sarana Multi which transfers all current and future rights and
Infrastruktur (“SMI”) yang mengalihkan seluruh hak obligations of PIP to SMI, including interest and
dan kewajiban PIP kepada SMI pada saat ini responsibilities in the Company’s investment
maupun pada masa yang akan datang yang meliputi agreement.
kepentingan dan tanggung jawab dalam perjanjian
investasi Perusahaan.

Sehubungan dengan fasilitas pinjaman tersebut In relation to this loan facility, the Company has
Perusahaan telah memenuhi batasan-batasan yang complied with the covenants in this agreement.
diwajibkan dalam perjanjian tersebut.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/97 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

25. UTANG KEPADA PEMERINTAH DAN LEMBAGA 25. GOVERNMENT AND NON-BANK GOVERNMENT
KEUANGAN PEMERINTAH NON-BANK (lanjutan) FINANCIAL INSTITUTION LOANS (continued)

PT Sarana Multi Infrastruktur (lanjutan) PT Sarana Multi Infrastruktur (continued)

Saldo pinjaman yang terutang dari utang kepada The outstanding balance of this non-bank Government
Lembaga Keuangan Pemerintah non-bank ini Financial Institution Loans is repayable according to
dibayarkan dengan jadwal pembayaran sebagai the following schedule:
berikut:

30 Juni 31 Desember/
June 30 December 31,
2023 2022

Dibayarkan: Payable:
Dalam satu tahun 750,000 750,000 Within one year
Pada tahun kedua 750,000 750,000 In the second year
Pada tahun ketiga 750,000 750,000 In the third year
Pada tahun keempat 375,000 750,000 In the fourth year
Pada tahun kelima dan keenam - - In the fifth and sixth years

Jumlah 2,625,000 3,000,000 Total

Perusahaan melakukan pembayaran pokok dan The Company made payments of principal and
bunga utang kepada Pemerintah sesuai dengan interest on Government loans in accordance with the
jadwal pembayaran dan memenuhi pembatasan - schedule of payments and complied with the
pembatasan dalam perjanjian utang kepada restrictions specified within the agreements of
Pemerintah yang berlaku pada tanggal laporan. Government loans as at the reporting date.

Pengembalian kompensasi Excess compensation

Pada tanggal 7 April 2022, BPK menyampaikan LHP On April 7, 2022, BPK submitted LHP No. 26/S/IX-
No. 26/S/IX-XX.1/4/2022 atas perhitungan XX.1/4/2022 for the calculation of compensation in
kompensasi tahun 2020. Berdasarkan LHP tersebut, 2020. Based on the LHP, the amount of the
nilai dana kompensasi pada tahun 2020 sebesar compensation in 2020 amounted to Rp16,702,245, so
Rp16.702.245 sehingga terdapat kelebihan there was an excess of 2020 compensation received
penerimaan kompensasi tahun 2020 yang diterima by the Group amounting to Rp1,202,263. Refund of
oleh Grup sebesar Rp1.202.263. Pengembalian atas the excess compensation has been fully paid by the
kelebihan penerimaan tersebut telah dibayarkan Group on June 29, 2022.
oleh Grup secara penuh pada tanggal 29 Juni 2022.

Berdasarkan hasil audit BPK atas kompensasi listrik Based on the audit result of BPK regarding electricity
tahun 2021 sesuai LHP No. 04/S/IX-XX/01/2023 compensation for the year 2021 as in LHP No.
tanggal 17 Januari 2023, terdapat kelebihan 04/S/IX-XX/01/2023 dated January 17, 2023, there
penerimaan kompensasi listrik oleh Perusahaan was excess compensation received by the Company
sebesar Rp675.985. Pengembalian atas kelebihan amounting to Rp675,985. Refund of the excess
penerimaan tersebut telah dibayarkan oleh Grup compensation has been paid by the Group through a
melalui set off dengan penerimaan kompensasi set off with the receipt of compensation in 2022 on
tahun 2022 pada tanggal 9 Juni 2023. June 9, 2023.

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.

26. UTANG SEWA 26. LEASE LIABILITIES

Akun ini terdiri dari utang Perusahaan kepada This account represents the Company’s liabilities to
PT Central Java Power (“CJP”) dalam rangka PT Central Java Power (“CJP”) in relation to the
Perjanjian Sewa Pembiayaan atas pengadaan Financial Lease Agreement on the acquisition of
pembangkitan tenaga listrik 4x660MW Tanjung Jati 4x660MW Tanjung Jati B Units A, B, C, D, and several
B Unit A, B, C, D, dan beberapa kontrak sewa lease contracts in relation to the leases of the gas
sehubungan dengan sewa kompresor gas di compressors at the various locations.
berbagai daerah.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/98 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

26. UTANG SEWA (lanjutan) 26. LEASE LIABILITIES (continued)

Nilai kini pembayaran minimum atas utang sewa The present value of minimum lease payments for
tersebut pada tanggal 30 Juni 2023 dan 31 such lease liabilities as at June 30, 2023 and
Desember 2022 adalah sebagai berikut: December 31, 2022 is as follows:
Berdasarkan jatuh tempo By due date
30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Pembayaran jatuh tempo dalam waktu: Minimum lease payments due:


Tidak lebih dari satu tahun 5,526,286 5,230,840 Not later than one year
Antara lebih dari satu tahun sampai Later than one year and not later than
tiga tahun 3,618,551 3,680,822 three years
Antara lebih dari tiga tahun sampai Later than three years and not later than
lima tahun 2,684,305 2,166,817 five years
Lebih dari lima tahun 4,158,508 6,904,222 Later than five years

Jumlah 15,987,650 17,982,701 Total


Dikurangi: bunga 4,046,569 5,120,386 Less: interest

Nilai kini pembayaran Present value of future minimum


sewa masa datang 11,941,081 12,862,315 lease payments

Dikurangi: bagian jatuh tempo dalam


satu tahun 2,697,560 4,448,363 Less: current portion

Bagian jangka panjang 9,243,521 8,413,952 Long-term portion

Berdasarkan pemberi sewa By lessor

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Pihak berelasi Related parties


PT Pelabuhan Indonesia (Persero) 755,964 754,167 PT Pelabuhan Indonesia (Persero)
Dana Pensiun PLN 974,669 399,553 Dana Pensiun PLN
PT Djakarta Llyod - 103,652 PT Djakarta Llyod

Subjumlah 1,730,633 1,257,372 Subtotal


Pihak ketiga Third parties
CJP 2,725,523 4,600,827 CJP
PT Sulawesi Regas Satu 1,647,324 1,713,985 PT Sulawesi Regas Satu
PT Gas Benoa Terminal 795,377 696,291 PT Gas Benoa Terminal
PT Lumoso 223,012 681,698 PT Lumoso
PT Perta Daya Gas 677,595 640,825 PT Perta Daya Gas
PT Batam Trans Gasindo 529,293 593,303 PT Batam Trans Gasindo
PT Sumber Petrindo Perkasa 359,459 336,400 PT Sumber Petrindo Perkasa
PT Indah Bima Prima 835,021 441,017 PT Indah Bima Prima
PT Bahtera Samudera Gemilang Line 23,740 103,467 PT Bahtera Samudera Gemilang Line
Lain-lain 2,394,104 1,797,131 Others

Subjumlah 10,210,448 11,604,943 Subtotal


Jumlah 11,941,081 12,862,315 Total

Dikurangi: bagian jatuh tempo dalam


satu tahun 2,697,560 4,448,363 Less: current portion

Bagian jangka panjang 9,243,521 8,413,952 Long-term portion

Tingkat suku bunga per tahun: Interest rate per annum:


Rupiah 4,4% - 10,22% 4.55% - 27.67% Rupiah
USD 13.19% 13.19% USD
JPY 7.57% - 18.10% 7.57% - 18.10% JPY
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/99 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

26. UTANG SEWA (lanjutan) 26. LEASE LIABILITIES (continued)

Berdasarkan pemberi sewa (lanjutan) By lessor (continued)

Rincian utang sewa dalam mata uang asing adalah Details of the lease liabilities in foreign currencies are
sebagai berikut: as follows:

30 Juni/ June 30, 31 Desember/ December 31,


2023 2022
Dalam mata Dalam mata
uang asing/ uang asing/
In foreign Ekuivalen Rp/ In foreign Ekuivalen Rp/
currencies*) Rp equivalent currencies*) Rp equivalent

JPY 26,084,159,086 2,725,523 39,004,601,063 4,600,827 JPY


USD 35,286,172 529,293 38,051,779 593,303 USD

Jumlah 3,254,816 5,194,130 Total

*) Dalam jumlah penuh *) In full amount

Beban bunga dan keuangan terkait utang sewa Interest expense and financial charges related to
pada periode enam bulan yang berakhir pada lease liabilities for the six-month periods ended June
tanggal 30 Juni 2023 dan 31 Desember 2022 30, 2023 and December 31, 2022 amounted to
masing-masing sebesar Rp1.322.598 dan Rp1,322,598 and Rp1,536,054, respectively (Note
Rp1.536.054 (Catatan 45). 45).

27. UTANG BANK 27. BANK LOANS

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Pinjaman terkait program percepatan Loans related to fast track program

Entitas yang berelasi dengan Pemerintah Government related entities


Agen: BNI Agent: BNI
Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah: entities:
- BNI 218,747 262,496 BNI -
- BRI 218,747 262,496 BRI -
- Bank Mandiri 218,747 262,496 Bank Mandiri -
- Lembaga Pembiayaan Ekspor Lembaga Pembiayaan Ekspor -
Indonesia (“LPEI”) 218,747 262,496 Indonesia (“LPEI”)

Subjumlah 874,988 1,049,984 Subtotal

Agen: Bank DKI Agent: Bank DKI


Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah: entities:
- Bank DKI 369,643 451,786 Bank DKI -
- SMI 128,571 157,143 SMI -
- Bank Jateng 64,286 78,571 Bank Jateng -
- BPD Aceh 32,143 39,286 BPD Aceh -
- Bank Kalteng 32,143 39,286 Bank Kalteng -
- Bank Riau 32,143 39,286 Bank Riau -
- Bank Kalbar 32,143 39,286 Bank Kalbar -
- BPD Bali 24,107 29,463 BPD Bali -

Subjumlah 715,179 874,107 Subtotal


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/100 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Pinjaman terkait program Loans related to fast track


percepatan (lanjutan) program (continued)

Pihak ketiga Third parties


The Export-Import Bank of China The Export-Import Bank of China
(“CEXIM”) 357,261 742,721 (“CEXIM”)
Agen: Industrial and Commercial Agent: Industrial and Commercial
Bank of China (“ICBC”) Bank of China (“ICBC”)
Sindikasi: Syndicated:
Pihak ketiga 1,281,003 1,775,413 Third parties

Subjumlah 1,638,264 2,518,134 Subtotal

Jumlah pinjaman terkait program Total loans related to fast track


percepatan 3,228,431 4,442,225 program

Pinjaman tidak terkait program Loans not related to fast track


percepatan program

Entitas yang berelasi dengan Pemerintah Government related entities


Agen: BNI Agent: BNI
Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- BNI 1,578,274 1,699,680 BNI -
- BRI 574,111 618,273 BRI -
- Bank Mandiri 1,291,431 1,390,772 Bank Mandiri -

Subjumlah 3,443,816 3,708,725 Subtotal

Agen: BRI Agent: BRI


Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- BRI 6,797,024 7,874,173 BRI -
- BRI Agro - 20,000 BRI Agro -
- BNI 1,326,368 1,544,349 BNI -
- Bank Mandiri 4,790,654 5,330,064 Bank Mandiri -
- LPEI 178,571 321,429 LPEI -
- SMI 794,643 955,357 SMI -
- BPD Papua 369,643 401,786 BPD Papua -
Pihak ketiga 3,117,439 3,603,278 Third parties

Subjumlah 17,374,342 20,050,436 Subtotal

Agen: Bank Mandiri Agent: Bank Mandiri


Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- Bank Mandiri 4,866,342 5,126,089 Bank Mandiri -
- Bank BNI 1,317,325 1,172,462 Bank BNI -
- BRI 500,000 571,429 BRI -
- BTN 2,000,000 2,179,297 BTN -
- SMI 1,000,000 1,142,858 SMI -
- LPEI 250,000 285,715 LPEI -
Pihak ketiga 4,866,340 5,179,299 Third parties
,
Subjumlah 14,800,007 15,657,149 Subtotal
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/101 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Pinjaman tidak terkait program Loans not related to fast track


percepatan (lanjutan) program (continued)

Entitas yang berelasi dengan Government related


Pemerintah (lanjutan) entities (continued):
Agen: BSI Agent: BSI
Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- BSI 2,012,436 2,090,316 BSI -
Pihak ketiga 365,566 378,302 Third Parties

Subjumlah 2,378,002 2,468,618 Subtotal

BTN 1,178,571 1,285,714 BTN

Pihak ketiga Third parties

Agen: Bank CIMB Niaga Agent: Bank CIMB Niaga


Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- SMI 616,071 669,643 SMI -
- BSI 123,214 133,929 BSI -
Pihak ketiga 4,135,715 4,321,428 Third parties

Subjumlah 4,875,000 5,125,000 Subtotal

Bank HSBC Indonesia 1,843,157 1,412,203 Bank HSBC Indonesia

ADB 21,944,195 23,230,636 ADB

Asian Infrastructure Asian Infrastructure


Investment Bank (“AIIB”) 1,452,500 1,509,825 Investment Bank (“AIIB”)

Agen: Credit Agricole CIB Paris Agent: Credit Agricole CIB Paris
Sindikasi: Syndicated:
Pihak ketiga 2,420,279 2,655,565 Third parties

Agen: Bank DBS Indonesia Agent: DBS Bank Indonesia


Sindikasi: Syndicated:
Pihak ketiga 23,100,000 26,818,240 Third parties

Agen: Export Guarantee and Agent: Export Guarantee and


Insurance Corporation (“EGAP”) Insurance Corporation (“EGAP”)
Sindikasi: Syndicated:
Pihak ketiga 159,497 176,844 Third parties

Agen: Servizi Assicurativi del Commercio Agent: Servizi Assicurativi del Commercio
Estero (“SACE”) Estero (“SACE”)
Sindikasi: Syndicated:
Pihak ketiga 375,281 405,182 Third parties

Agen: Korea Exim Bank (“KEXIM”) Agent: Korea Exim Bank (“KEXIM”)
Sindikasi: Syndicated:
Pihak ketiga 665,625 738,021 Third parties

International Bank for International Bank for


Reconstruction and Development Reconstruction and Development
(“IBRD”) 6,788,726 7,248,428 (“IBRD”)

Islamic Development Bank (“IDB”) 3,095,864 3,167,662 Islamic Development Bank (“IDB”)
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/102 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Pinjaman tidak terkait program Loans not related to fast track


percepatan (lanjutan) program (continued)

Pihak ketiga (lanjutan) Third parties (continued)

Agen: Japan Bank for Agent: Japan Bank for


International Cooperation (“JBIC”) International Cooperation (“JBIC”)
Sindikasi: Syndicated:
Pihak ketiga 7,155,420 8,315,112 Third parties

Agen: MUFG Bank, Ltd. (“MUFG Bank”) Agent: MUFG Bank, Ltd. (“MUFG Bank”)
Sindikasi: Syndicated:
Pihak ketiga 3,898,157 4,828,068 Third parties

Agen: Export Development Canada (“EDC”) Agent: Export Development Canada (“EDC”)
Sindikasi: Syndicated:
Pihak ketiga 3,375,000 3,800,550 Third parties

Agen: Sumitomo Mitsui Banking Corporation Agent: Sumitomo Mitsui Banking Corporation
(“SMBC”) (“SMBC”)
Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- LPEI 8,182 148,833 LPEI -
Pihak ketiga 1,277,932 7,422,638 Third parties

Agence Francaise De Developpement Agence Francaise De Developpement


(“AFD”) 1,037,594 1,047,724 (“AFD”)

Bank Gospodarstwa Krajowego Bank Gospodarstwa Krajowego


(“BGK”) 800,220 863,872 (“BGK”)

Agen: BNP Paribas SA Agent: BNP Paribas SA


Sindikasi: Syndicated:
Pihak ketiga 1,113,320 1,193,184 Third parties

Agen: Standard Chartered Bank (“SCB”) Agent: Standard Chartered Bank (“SCB”)
Sindikasi: Syndicated:
Pihak ketiga 957,387 1,076,737 Third parties

KfW 3,428,327 3,565,914 KfW

Mizuho Bank 731,320 801,926 Mizuho Bank

Subjumlah 85,627,983 100,427,164 Subtotal

Jumlah pinjaman tidak terkait Total loans not related to


program percepatan 129,677,721 148,722,806 fast track program

Jumlah 132,906,152 153,165,031 Total

Biaya transaksi belum diamortisasi (633,806) (754,913) Unamortised transaction costs

Jumlah, bersih 132,272,346 152,410,118 Total, net


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/103 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Dikurangi: bagian jatuh tempo


dalam satu tahun Less: current maturities

Pinjaman terkait program percepatan Loans related to fast track program

Entitas yang berelasi dengan Pemerintah Government related entities


Agen: BNI Agent: BNI
Sindikasi: Syndicated:
Entitas yang berelasi dengan
Pemerintah Government related entities
- BNI 65,624 87,499 BNI -
- BRI 65,624 87,499 BRI -
- Bank Mandiri 65,624 87,499 Bank Mandiri -
- LPEI 65,624 87,498 LPEI -

Subjumlah 262,496 349,995 Subtotal

Agen: Bank DKI Agent: Bank DKI


Sindikasi: Syndicated:
Entitas yang berelasi dengan
Pemerintah Government related entities
- Bank DKI 164,286 164,286 Bank DKI -
- SMI 57,143 57,143 SMI -
- Bank Jateng 28,571 28,571 Bank Jateng -
- BPD Aceh 14,286 14,286 BPD Aceh -
- Bank Kalteng 14,286 14,286 Bank Kalteng -
- Bank Riau 14,286 14,286 Bank Riau -
- Bank Kalbar 14,286 14,286 Bank Kalbar -
- BPD Bali 10,714 10,714 BPD Bali -

Subjumlah 317,858 317,858 Subtotal

Pihak ketiga Third parties


CEXIM 357,261 742,720 CEXIM

Agen: ICBC Agent: ICBC


Sindikasi: Syndicated:
Pihak ketiga 854,002 887,707 Third parties

Jumlah pinjaman terkait program Total loans related to fast track


percepatan 1,791,617 2,298,280 program
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/104 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Pinjaman tidak terkait program Loans not related to fast track


percepatan program

Entitas yang berelasi dengan Pemerintah Government related entities

Agen: BNI Agent: BNI


Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- BNI 242,811 125,275 BNI -
- BRI 88,325 45,570 BRI -
- Bank Mandiri 198,682 102,507 Bank Mandiri -

Subjumlah 529,818 273,352 Subtotal

Agen: BRI Agent: BRI


Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- BRI 1,800,758 1,977,527 BRI -
- BRI Agro - 20,000 BRI Agro -
- BNI 435,963 435,963 BNI -
- Bank Mandiri 1,078,820 1,078,820 Bank Mandiri -
- LPEI 71,429 178,571 LPEI -
- SMI 178,571 250,000 SMI -
- BPD Papua 64,286 64,286 BPD Papua -
Pihak ketiga 585,963 778,821 Third parties

Subjumlah 4,215,790 4,783,988 Subtotal

Agen: Bank Mandiri Agent: Bank Mandiri


Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- Bank Mandiri 464,285 464,285 Bank Mandiri -
- BRI 142,857 142,857 BRI -
- SMI 285,714 285,714 SMI -
- LPEI 71,429 71,429 LPEI -
Pihak ketiga 749,999 749,999 Third parties

Subjumlah 1,714,284 1,714,284 Subtotal

Agen: BSI Agent: BSI


Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- BSI 155,759 145,375 BSI -
Pihak ketiga 25,472 23,774 Third Parties

Subjumlah 181,231 169,149 Subtotal

BTN 214,286 214,286 BTN

Pihak ketiga Third parties


Agen: Bank CIMB Niaga Agent: Bank CIMB Niaga
Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- BSI 21,429 21,429 BSI -
- SMI 107,143 107,143 SMI -
Pihak ketiga 371,428 371,428 Third parties

Subjumlah 500,000 500,000 Subtotal


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/105 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022
Pinjaman tidak terkait program Loans not related to fast track
percepatan (lanjutan) program (continued)
Bank HSBC Indonesia 267,377 277,929 Bank HSBC Indonesia
ADB 1,174,378 1,167,420 ADB
Agen: Credit Agricole CIB Paris Agent: Credit Agricole CIB Paris
Sindikasi: Syndicated:
Pihak ketiga 268,920 363,813 Third parties
Agen: Bank DBS Indonesia Agent: DBS Bank Indonesia
Sindikasi: Syndicated:
Pihak ketiga 9,600,000 6,670,257 Third parties
Agen: EGAP Agent: EGAP
Sindikasi: Syndicated:
Pihak ketiga 21,266 22,106 Third parties
Agen: SACE Agent: SACE
Sindikasi: Syndicated:
Pihak ketiga 50,038 50,648 Third parties
Agen: KEXIM Agent: KEXIM
Sindikasi: Syndicated:
Pihak ketiga 88,750 92,253 Third parties
IBRD 382,485 374,193 IBRD
Agen: JBIC Agent: JBIC
Sindikasi: Syndicated:
Pihak ketiga 1,131,248 1,123,604 Third parties
Agen: MUFG Bank Agent: MUFG Bank
Sindikasi: Syndicated:
Pihak ketiga 1,829,263 1,714,030 Third parties
Agen: EDC Agent: EDC
Sindikasi: Syndicated:
Pihak ketiga 562,500 584,700 Third parties
Agen: SMBC Agent: SMBC
Sindikasi: Syndicated:
Entitas yang berelasi dengan Government related
Pemerintah entities
- LPEI 8,182 148,833 LPEI -
Pihak ketiga 467,582 6,480,004 Third parties
AFD 75,549 76,262 AFD
BGK 110,506 111,854 BGK
Agen: BNP Paribas SA Agent: BNP Paribas SA
Sindikasi: Syndicated:
Pihak ketiga 130,979 132,576 Third parties
Agen: SCB Agent: SCB
Sindikasi: Syndicated:
Pihak ketiga 212,752 215,347 Third parties
KfW 293,815 290,334 KfW
Mizuho Bank 121,886 123,373 Mizuho Bank

Subjumlah 16,797,476 20,019,536 Subtotal

Jumlah pinjaman tidak terkait Total loans not related to


program percepatan 24,152,885 27,674,595 fast track program

Dikurangi: bagian jatuh tempo


dalam satu tahun 25,944,502 29,972,875 Less: current portion

Bagian jangka panjang 106,327,844 122,437,243 Long-term portion


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/106 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Tingkat suku bunga per tahun Interest rate per annum


Rupiah 4.95% - 8.68% 3.30% - 8.06% Rupiah
USD 2.56% - 8.03% 0.66% - 7.50% USD
JPY 0.60% - 1.74% 0.60% - 1.74% JPY
EUR 0.39% - 5.58% 0.28% - 4.27% EUR

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, 2022, the
rincian utang bank dalam mata uang asing adalah details of bank loans in foreign currency are as follows:
sebagai berikut:

30 Juni/ June 30, 31 Desember/ December 31,


2023 2022
Dalam mata Dalam mata
uang asing/ uang asing/
In foreign Ekuivalen Rp/ In foreign Ekuivalen Rp/
currencies*) Rp equivalent currencies*) Rp equivalent

USD 4,279,220,096 64,188,301 4,976,089,965 77,587,195 USD


EUR 922,812,164 15,141,963 963,714,411 16,005,947 EUR
JPY 75,949,990,955 7,935,984 79,285,135,954 9,352,157 JPY

Jumlah 87,266,248 102,945,299 Total

*) Dalam jumlah penuh *) In full amount


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/107 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

Pinjaman terkait program percepatan Loans related to fast track program

Perusahaan memperoleh fasilitas pinjaman dari The Company obtained loan facilities from several
beberapa bank untuk membiayai 85% dari nilai banks to finance 85% of the value of EPC contracts for
kontrak EPC untuk program percepatan. Pinjaman its fast track program. These loans are fully
ini sepenuhnya dijamin oleh Pemerintah Republik guaranteed by the Government of the Republic of
Indonesia sesuai dengan Perpres No. 91 Tahun Indonesia in accordance with Perpres No. 91 Year
2007, pengganti dari Perpres No. 86 Tahun 2006, 2007, which superseded Perpres No. 86 Year 2006,
tentang Pemberian Jaminan Pemerintah untuk regarding the Grant of Government Guarantee for
Percepatan Pembangunan Pembangkit Tenaga Construction of a Coal-Fired Power Plant. In
Listrik yang Menggunakan Batubara. Sehubungan connection with these loans, the Company is restricted
dengan pinjaman ini, Perusahaan dibatasi oleh by general rules as described in the loan agreements.
ketentuan-ketentuan umum sebagaimana ditetapkan
dalam perjanjian pinjaman.

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, the details of
rincian fasilitas pinjaman tersebut adalah sebagai such loan facilities are as follows:
berikut:
Fasilitas
maksimum/ Jumlah pinjaman/
Pembayaran Outstanding balance*) Repayment*)
Kembali 30 Juni/ 31 Desember 30 Juni/ 31 Desember
Kreditur dan jenis pinjaman/ Mata uang/ Maximum June 30, December 31, June 30, December 31, Periode pinjaman/
No. Creditor and type of loan Currency facility*) 2023 2022 2023 2022 Loan term

1 The Export/ Import Bank of China/ Dolar AS/ 331 12 24 12 24 30 Januari/January 2008 -
PLTU 2 Paiton, Jawa Timur/East Java US Dollar 21 Juli/July 2023

2 The Export Import Bank of China/ Dolar AS/ 284 12 24 12 24 30 Januari/January 2008 -
PLTU 1 Suralaya, Banten US Dollar 21 Juli/July 2023

3 The Export Import Bank of China/ Dolar AS/ 482 - - 163 4 Mei/May 2009 -
PLTU Pelabuhan Ratu US Dollar 21 Januari/January 2025

4 The Export Import Bank of China/ Dolar AS/ 124 - - 32 4 Mei/May 2009 -
PLTU NAD US Dollar 21 Juli/July 2024

5 Bank of China Limited/ Dolar AS/ 455 - 22 4 Mei/May 2009 -


PLTU Teluk Naga US Dollar 4 Mei/May 2022

6 The Export Import Bank of China/ Dolar AS/ 293 - - - 88 17 Juli/July 2009 -
PLTU Pacitan US Dollar 21 Januari/January 2025

7 China Development Bank/ Dolar AS/ 625 85 114 28 57 14 Oktober/October 2009 -


PLTU Adipala, Cilacap US Dollar 2 November 2024

8 Pinjaman sindikasi dikoordinasi/


Syndicated loan coordinated by
Bank DKI/ Rupiah 2,225,000 715,179 874,107 158,929 317,857 12 November 2015 -
PLTU Riau Tenayan 12 November 2025

9 Pinjaman sindikasi dikoordinasi/


Syndicated loan coordinated by
BNI/ 17 Desember/December 2015 -
PLTU Kalimantan Timur/East Kalimantan Rupiah 2,449,963 874,987 1,049,984 174,997 349,995 16 Desember/December 2025

*) Dalam jutaan mata uang asal *) In million original currency

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Tingkat suku bunga per tahun Interest rate per annum


Rupiah 7.58% - 8.28% 4.95% - 7.88% Rupiah
USD 5.92% - 7.38% 1.29% - 4.14% USD
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/108 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

Pinjaman tidak terkait program percepatan Loans not related to fast track program
Fasilitas
maksimum/ Jumlah pinjaman/
Pembayaran Outstanding balance*) Repayment*)
Kembali 30 Juni/ 31 Desember 30 Juni/ 31 Desember
Kreditur dan jenis pinjaman/ Mata uang/ Maximum June 30, December 31, June 30, December 31, Periode pinjaman/
No. Creditor and type of loan Currency facility*) 2023 2022 2023 2022 Loan term

1 Bank Mandiri
- Pinjaman Perusahaan 2016/ Rupiah 12,000,000 6,000,006 6,857,148 857,142 1,714,284 19 Desember/December 2016 -
Corporate Loan 2016 23 November 2026
- Pinjaman Perusahaan 2018/ Rupiah 9,900,000 - - 2,257,920 21 Agustus/August 2018 -
Corporate Loan 2018 21 Agustus/August 2023
- Pinjaman Perusahaan 2020/ Rupiah 8,800,000 8,800,000 8,800,000 - - 4 Desember/December 2020 -
Corporate Loan 2020 23 September 2030
- Fasilitas Kredit Modal Kerja Bilateral 2022/ Rupiah 1,000,000 - - 1,000,000 23 Agustus/August 2022 -
Bilateral Working Capital Loan Facility 2022 21 Juni/June 2023

Subjumlah 14,800,006 15,657,148 857,142 4,972,204 Subtotal

2 BRI
- Pinjaman Perusahaan 2019/ Rupiah 13,250,000 10,883,929 11,830,357 946,429 1,419,643 23 April 2019 -
Corporate Loan 2019 23 April 2029
- Pinjaman Perusahaan 2015/ Rupiah 12,000,000 4,285,714 5,142,857 857,143 1,714,286 17 Desember/December 2015 -
Corporate Loan 2015 17 Desember/December 2025
- Pinjaman Perusahaan 2016/ Rupiah 4,402,500 - 568,198 568,198 1,136,397 23 Mei/May 2016 -
Corporate Loan 2016 23 Mei/May 2023
- Pinjaman Sindikasi 2018/ Rupiah 4,506,787 1,776,128 1,937,594 161,466 322,932 14 November 2018 -
Syndicated Loan 2018 14 November 2028
- Pinjaman Perusahaan 2014/ Rupiah 2,000,000 428,571 571,429 142,857 285,714 17 Desember/December 2014 -
Corporate Loan 2014 17 Desember/December 2024
- Kredit Modal Kerja 2011/ Rupiah 25,000,000 - - 500,000 21 Juni/June 2022 -
Working Capital Loan 2011 21 Juni/June 2023

Subjumlah 17,374,342 20,050,435 2,676,093 5,378,972 Subtotal

3 BNI
- Pinjaman Perusahaan 2019/ Rupiah 5,071,000 3,443,816 3,708,725 264,909 - 18 Desember/December 2019 -
Corporate Loan 2019 18 Desember/December 2029

4 BSI
- Fasilitas Kredit Modal Kerja Bilateral 2019/ Rupiah 2,846,000 1,178,002 1,268,618 90,616 - 18 Desember/December 2019 -
Bilateral Working Capital loan Facility 2019 18 Desember/December 2029
- Pinjaman Perusahaan 2020 Rupiah 1,200,000 1,200,000 1,200,000 - - 4 Desember/December 2020 -
Corporate Loan 2020 _____________ _____________ _____________ _____________ 23 September 2030

Subjumlah 2,378,002 2,468,618 90,616 - Subtotal

5 BTN
- Fasilitas Kredit Modal Kerja Bilateral 2019/ Rupiah 1,500,000 1,178,571 1,285,714 107,143 214,286 24 April 2019 -
Bilateral Working Capital loan Facility 2019 24 April 2029

6 BCA

- Fasilitas Kredit Modal Kerja Bilateral 2019/ Rupiah 2,000,000 - - 2,000,000 2,000,000 6 September 2021 -
Bilateral Working Capital loan Facility 2019 _____________ _____________ ___________ _____________ 6 Desember/December 2022

Subjumlah - - 2,000,000 2,000,000 Subtotal

7 Bank Danamon Indonesia


- Fasilitas Kredit Modal Kerja Bilateral 2019/ Rupiah 2,000,000 - - - 1,000,000 12 Desember/December 2021 -
Bilateral Working Capital loan Facility 2019 12 Desember/December 2022

8 Bank Maybank Indonesia


- Pinjaman Perusahaan 2017/ Rupiah 4,300,000 - - - 3,685,714 2 November 2017 -
Corporate Loan 2017 2 November 2027
- Fasilitas Kredit Modal Kerja Bilateral 2022/ Rupiah 1,000,000 - - 1,000,000 14 Maret/March 2022-
Bilateral Working Capital loan facility 2022 - 14 Maret/March 2023

Subjumlah - - - 4,685,714 Subtotal

9 Bank CIMB Niaga


- Pinjaman Perusahaan 2019/ Rupiah 3,500,000 2,875,000 3,125,000 250,000 375,000 23 April 2019 -
Corporate Loan 2019 23 April 2029
- Pinjaman Perusahaan 2021/ Rupiah 1,000,000 1,000,000 1,000,000 - - 4 Desember/December 2020 -
Corporate Loan 2021 23 Desember/December 2026
- Pinjaman Perusahaan 2021 (syariah)/ Rupiah 1,000,000 1,000,000 1,000,000 - - 4 Desember/December 2020 -
Corporate Loan 2021 (sharia) 23 Desember/December 2026

Subjumlah 5,000,000 5,125,000 250,000 375,000 Subtotal

10 Bank HSBC Indonesia


- Fasilitas Kredit Modal Kerja Bilateral 2018/ Rupiah 1,400,000 - - 1,400,000 22 April 2021 -
Bilateral Working Capital Loan Facility 2018 30 Juni/June 2023
- Fasilitas Kredit untuk Tambak Lorok 2018 Dolar AS/ 214 123 91 9 18 19 Februari/February 2018 -
Credit Facility for Tambak Lorok 2018 US Dollar 19 Agustus/August 2032

Subjumlah 123 91 9 1,400,018 Subtotal

11 Bank DBS Indonesia


- Fasilitas Kredit Berjangka 2019/ Dolar AS/ 1,000 540 720 180 180 25 Juni/June 2019 -
Term Loan Facilities 2019 US Dollar 25 Juni/June 2024
- Fasilitas Kredit Berjangka MIGA 2020/ Dolar AS/ 500 500 500 - - 23 Desember/December 2020 -
MIGA Term Loan Facilities 2020 US Dollar 23 Desember/December 2025
- Fasilitas Kredit Berjangka 2021/ Dolar AS/ 500 500 500 - - 22 Desember/December 2021 -
Term Loan Facilities 2021 US Dollar 22 Desember/December 2026

Subjumlah 1,540 1,720 180 Subtotal

12 MUFG Bank
- Fasilitas Kredit Berjangka 2020/ Yen Jepang/ 33,000 33,000 33,000 - - 5 Maret/March 2020 -
Term Loan Facilities 2020 Japan Yen 5 Maret/March 2025
- Pinjaman Perusahaan 2018/ Dolar AS/ 100 30 60 30 40 13 Desember/December 2018 -
Corporate Loan 2018 US Dollar - 13 Desember/December 2023
- Fasilitas Kredit Modal Kerja Bilateral 2022/ Rupiah 1,000,000 - - 3,000,000 6 April 2022 -
Bilateral Working Capital Loan Facility 2022 - 6 April 2023

Subjumlah 33,060 33,060 30 3,000,040 Subtotal

13 SCB
- Fasilitas Arun 2013/ Euro 90 32 35 4 7 11 Desember/December 2013 -
Arun Facility 2013 30 September 2027
- Fasilitas Bangkanai 2013/ Euro 71 27 30 3 6 23 Desember/December 2013 -
Bangkanai Facility 2013 30 September 2027

Subjumlah 59 65 7 13 Subtotal
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/109 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

Pinjaman tidak terkait program percepatan Loans not related to fast track program (continued)
(lanjutan)
Fasilitas
maksimum/ Jumlah pinjaman/
Pembayaran Outstanding balance*) Repayment*)
Kembali 30 Juni/ 31 Desember 30 Juni/ 31 Desember
Kreditur dan jenis pinjaman/ Mata uang/ Maximum June 30, December 31, June 30, December 31, Periode pinjaman/
No. Creditor and type of loan Currency facility*) 2023 2022 2023 2022 Loan term

14 AFD
- Pinjaman Perusahaan 2015/ Euro 71 63 63 4 - 7 Mei/May 2015 -
Corporate Loan 2015 7 Mei/May 2030

15 KfW
- Fasilitas Kredit untuk Bangkanai Peaker/ Euro 83 43 47 4 8 15 September 2017 -
Credit Facility for Bangkanai Peaker 15 Desember/December 2028
- Fasilitas Kredit untuk Geothermal Energy Euro 150 1.2 1.2 - - 11 Oktober/October 2018 -
Programme Ulumbu & Mataloko 2018/ 15 November 2033
Credit Facility for Geothermal Energy Programme
Ulumbu & Mataloko 2018
- Fasilitas Kredit untuk Kumbih 03 2017/ Euro 85 - 0.3 0.3 1 15 Desember/December 2017 -
Credit Facility for Kumbih 03 2017 30 Desember/December 2032
- Fasilitas Kredit untuk Hydropower Programme 2019/ Euro 225 4 1.6 - - 5 September 2019 -
Credit Facility for Hydropower Programme 2019 15 November 2033
- Fasilitas Kredit untuk Kamojang PP 2015/ Euro 60 - - - - 8 Mei/May 2015 -
Credit Facility for Kamojang PP 2015 30 Juni/June 2030
- Fasilitas Kredit untuk 1000 Pulau
Renewable Energi untuk Electrification
Program (Nusa Tenggara Timur)/ Euro 70 0.4 0.4 - - 8 Mei/May 2015 -
Credit Facility for 1000 Islands 30 Juni/June 2030
Renewable Energy for Electrification
Program (Nusa Tenggara Timur)
- Fasilitas Kredit untuk RBL SNT/ Euro 45 32 35 3 6 23 Mei/May 2016 -
Credit Facility for RBL SNT 30 Juni/June 2028
- Fasilitas Kredit untuk RBL SNT (KfW 29069)/ Euro 255 129 129 - - 8 Desember/December 2020-
Credit Facility for RBL SNT (KfW 29069) 15 Mei/May 2036

Subjumlah 209.6 214.5 7.3- 15 Subtotal

16 ADB
- Fasilitas Kredit akses Energi berkelanjutan Dolar AS/ 600 546 565 19 18 10 Oktober/October 2017 -
Di Kawasan Indonesia Timur 2017/ US Dollar 15 Mei/May 2037
Credit Facility for Sustainable Energy
Access in Eastern Indonesia 2017
- Fasilitas Kredit Penguatan Euro 575 408 425 16 33 4 Desember/December 2015 -
Gardu Sumatera 2015/ Dolar AS/ 24 25 1 2 15 September 2035
Credit Facility Grid Strengthening Sumatera 2015 US Dollar
- Fasilitas Kredit Penguatan Dolar AS/ 25 21 21 1 2 4 Desember/December 2015 -
Gardu 2015/ US Dollar 15 September 2035
Credit Facility Grid Strengthening 2015
- Fasilitas Kredit akses Energi berkelanjutan Dolar AS/ 600 276 276 - - 8 Desember/December 2020 -
Di Kawasan Indonesia Timur 2020 (Tahap II)/ US Dollar 15 Oktober/October 2040
Credit Facility for Sustainable Energy
Access in Eastern Indonesia 2020 (Phase II)
- Fasilitas Kredit akses Energi yang berkelanjutan Dolar AS/ 600 150 150 - - 31 Desember/December 2021 -
dan Andal – Jawa Barat dan Jawa Tengah/ US Dollar 15 Oktober/October 2041
Credit Facility for Sustainable and Reliable Energy
Access Program – Western and Central Java _____________ _____________ _____________ _____________

Subjumlah 1,425 1,462 37 55 Subtotal

17 EDC dan Hungarian Export Import Bank


Private Limited Company (“HEXIM”)
- Fasilitas Kredit untuk Batam Mobile Dolar AS/ 436 218 236 18 36 2 Desember/December 2016 -
Power Plant 2016/ US Dollar 27 Januari/January 2029
Credit Facility for Batam Mobile
Power Plant 2016
- Fasilitas Kredit untuk Batam Mobile Dolar AS/ 14 7 8 1 1 1 Mei/May 2017-
Power Plant 2017/ US Dollar 27 Januari/January 2029
Credit Facility for Batam Mobile
Power Plant 2017

Subjumlah 225 244 19 37 Subtotal

18 JBIC
- Fasilitas Kredit untuk Pembangunan Yen Jepang/Japan Yen 31,763 20,239 21,563 1,323 2,647 20 Oktober/October 2016 -
PLTU Jawa 2 Priok 2016/ Dolar AS/ 45 30 32 2 4 30 April 2031
Credit Facility for Construction of Jawa 2 US Dollar
Priok Steam Electricity Power Plant 2016
- Fasilitas Kredit untuk Pembangunan Yen Jepang/Japan Yen 16,430 10,046 10,731 685 1,369 14 Maret/March 2016 -
PLTU Lontar 2016/ Dolar AS/ 179 104 102 7 15 1 Oktober/October 2031
Credit Facility for Construction of US Dollar
Lontar Steam Electricity Power Plant 2016
- Fasilitas Kredit untuk Pembangunan Yen Jepang/Japan Yen 15,449 9,538 10,134 596 1,192 10 Maret/March 2017 -
Fasilitas Muara Karang 2017/ Dolar AS/ 37 25 26 2 3 29 Mei/May 2031
Credit Facility for Construction of US Dollar
Muara Karang Facility 2017
- Fasilitas Kredit untuk Pembangunan Yen Jepang/Japan Yen 16,939 3126 3,857 731 1,412 20 Juni/June 2017 -
PLTU Kalselteng 2 2017/ Dolar AS/ 89 19 23 4 7 15 September 2032
Credit Facility for Construction of Kalselteng US Dollar
2 Steam Electricity Power Plant 2017

Subjumlah 43,127 46,468 3,350 6,649 Subtotal

19 IBRD
- Fasilitas Kredit untuk Membiayai Power
Distribution Development Program 2016/ Dolar AS/ 500 453 465 12 24 20 Mei/May 2016 -
Credit Facility to Finance Power US Dollar 15 Maret/March 2036
Distribution Development Program 2016

20 KEXIM
- Fasilitas Kredit untuk Membiayai
PLTGU Grati 2016/ Dolar AS/ 71 44 47 3 6 24 Juni/June 2016 -
Credit Facility to Finance US Dollar 23 Desember/December 2030
PLTGU Grati 2016

21 IDB
- Fasilitas Kredit untuk Membiayai Power
Grid Enhancement Program 2017/ Dolar AS/ 330 206 203 - - 10 Januari/January 2017 -
Credit Facility to Finance Power US Dollar 6 Agustus/August 2023
Grid Enhancement Program 2017

22 SMBC
- Fasilitas Kredit Berjangka 2018/ Dolar AS/ 1,320 24 420 396 528 1 Agustus/August 2018 -
Term Loan Facilities 2018 US Dollar 1 Agustus/August 2023
- Fasilitas Kredit Bilateral 2018/ Dolar AS/ 175 - - - 175 18 Desember/December 2018 -
Bilateral Loan Facilities 2018 US Dollar 18 Desember/December 2023
- Fasilitas Kredit untuk Membiayai
PLTA Jatigede/ Dolar AS/ 73 62 66 4 5 30 Maret/March 2017 -
Credit Facility to Finance US Dollar 30 Maret/March 2031
PLTA Jatigede

Subjumlah 86 486 400 533 Subtotal


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/110 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan) 27. BANK LOANS (continued)

Pinjaman tidak terkait program percepatan Loans not related to fast track program (continued)
(lanjutan)
Fasilitas
maksimum/ Jumlah pinjaman/
Pembayaran Outstanding balance*) Repayment*)
Kembali 30 Juni/ 31 Desember 30 Juni/ 31 Desember
Kreditur dan jenis pinjaman/ Mata uang/ Maximum June 30, December 31, June 30, December 31, Periode pinjaman/
No. Creditor and type of loan Currency facility*) 2023 2022 2023 2022 Loan term

23 Mizuho
- Fasilitas Kredit untuk Membiayai
Lombok Peaker 2017/ Euro 74 45 48 4 7 24 Mei/May 2017 -
Credit Facility to Finance 24 Januari/January 2029
Lombok Peaker 2017

24 Credit Agricole CIB PARIS


- Fasilitas Kredit untuk Membiayai
PLTGU Muara Tawar 2017/ Dolar AS/ 280 161 170 9 23 8 November 2017 -
Credit Facility to Finance US Dollar 8 Mei/May 2032
PLTGU Muara Tawar 2017

25 BNP Paribas SA
- Fasilitas Kredit untuk Membiayai
Sumbagut 2 Peaker 2018/ Euro 108 72 72 4 8 9 Februari/February 2018 -
Credit Facility to Finance 9 Oktober/October 2031
Sumbagut 2 Peaker 2018

26 BGK
- Fasilitas Kredit untuk Membiayai
PLTU Lombok FTP-2 2018/ Euro 81 49 52 3 7 21 Februari/February 2018 -
Credit Facility to Finance 28 Februari/February 2033
PLTU Lombok FTP-2 2018

27 SACE
- Fasilitas Kredit untuk Membiayai Euro 40 23 24 2 3 24 Juni/June 2016 -
PLTGU Grati 2016/ 23 Desember/December 2030
Credit Facility to Finance
PLTGU Grati 2016

28 Exportni Garancni
a Pojistovaci Spolecnost (“EGAP”)
- Fasilitas Kredit untuk Membiayai
PLTGU Grati 2016/ Dolar AS/ 17 11 11 1 1 24 Juni/June 2016 -
Credit Facility to Finance US Dollar 23 Desember/December 2030
PLTGU Grati 2016

29 AIIB
- Fasilitas Kredit untuk Membiayai Proyek Penguatan
Distribusi Tenaga Listrik Jawa Timur & Bali 2021/ Dolar AS/ 310 97 97 - - 10 Februari/February 2021 -
Credit Facility to FinanceEast Java & Bali US Dollar 15 Oktober/October 2040
Power Distribution Strengthening Project 2021

30 LPEI
- Fasilitas Kredit Modal Kerja Bilateral 2019/ Rupiah 3,500,000 - - - 10,000,000 20 Desember/December 2022-
Bilateral Working Capital loan Facility 2019 20 Desember/December 2023

31 UOB
- Fasilitas Kredit Modal Kerja Bilateral 2019/ Rupiah 1,000,000 - - - 2,000,000 11 Februari/February 2021-
Bilateral Working Capital Loan Facility 2019 31 Mei/May 2023

32 Muamalat
- Fasilitas Kredit Modal Kerja Bilateral 2022/ Rupiah 1,000,000 - - - 1,000,000 21 Februari/February 2022-
Bilateral Working Capital loan Facility 2022 21 Februari/February 2023

33 DKI
- Fasilitas Kredit Modal Kerja Bilateral 2022/ Rupiah 1,000,000 - - - 500,000 28 Maret/March 2022-
Bilateral Working Capital loan Facility 2022 28 Maret/March 2023

*) Dalam jutaan mata uang asal *) In million original currency

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022
Tingkat suku bunga per tahun Interest rate per annum
Rupiah 4.95% - 8.68% 3.30% - 8.06% Rupiah
USD 2.56% - 8.03% 0.66% - 7.50% USD
EUR 0.60% - 1.74% 0.60% - 1.74% EUR
JPY 0.39% - 5.58% 0.28% - 4.27% JPY

Perusahaan melakukan pembayaran pokok dan The Company has made payments of principal and
bunga pinjaman bank sesuai dengan jadwal interest on the bank loans in accordance with the
pembayaran dalam perjanjian pinjaman bank yang schedule of payment specified within the
berlaku pada tanggal laporan. agreements of the bank loans as at the reporting
date.
Selama periode enam bulan yang berakhir tanggal During the six-month periods ended June 30, 2023
30 Juni 2023 dan 2022, Grup melakukan penarikan and 2022, the Group made withdrawals from all
seluruh pinjaman bank sebesar USD53.777.815 bank loans amounting to USD53,777,815
(setara dengan Rp805.730) dan EUR6.634.936 (equivalent to Rp805,730) and EUR6,634,936
(setara dengan Rp108.273), dan (2022: (equivalent to Rp108,273), and (2022:
USD26.738.581 (setara dengan Rp386.891), USD26,738,581 (equivalent to Rp386,891),
EUR137.101.705 (setara dengan Rp2.225.381), EUR137,101,705 (equivalent to Rp2,225,381),
JPY24.595.415 (setara dengan Rp3.029) dan JPY24,595,415 (equivalent to Rp3,029) and
Rp24.400.000). Rp24,400,000).
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/111 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI, SUKUK IJARAH DAN KIK - 28. BONDS PAYABLE, SUKUK IJARA AND KIK - EBA
EBA LOANS

Obligasi dan sukuk ijarah Bonds and sukuk ijara

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Obligasi dan Sukuk Ijarah Rupiah Rupiah Bonds and Sukuk Ijara
Obligasi Berkelanjutan IV Shelf Registration Bonds IV
PLN Tahap I Tahun 2020 1,500,000 1,500,000 PLN I Year 2020
Sukuk Ijarah Berkelanjutan IV Shelf Registration Sukuk Ijara IV
PLN Tahap I Tahun 2020 376,500 376,500 PLN I Year 2020
Obligasi Berkelanjutan III Shelf Registration Bonds III
PLN Tahap VII Tahun 2020 1,420,435 1,737,135 PLN VII Year 2020
Obligasi Berkelanjutan III Shelf Registration Bonds III
PLN Tahap VI Tahun 2020 4,812,430 4,812,430 PLN VI Year 2020
Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III
PLN Tahap VI Tahun 2020 115,500 115,500 PLN VI Year 2020
Obligasi Berkelanjutan III Shelf Registration Bonds III
PLN Tahap V Tahun 2019 1,912,900 1,912,900 PLN V Year 2019
Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III
PLN Tahap V Tahun 2019 797,500 797,500 PLN V Year 2019
Obligasi Berkelanjutan III Shelf Registration Bonds III
PLN Tahap IV Tahun 2019 2,953,620 2,953,620 PLN IV Year 2019
Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III
PLN Tahap IV Tahun 2019 1,250,000 1,250,000 PLN IV Year 2019
Obligasi Berkelanjutan III Shelf Registration Bonds III
PLN Tahap III Tahun 2019 2,024,000 2,024,000 PLN III Year 2019
Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III
PLN Tahap III Tahun 2019 600,000 600, 000 PLN IIIYear 2019
Obligasi Berkelanjutan III Shelf Registration Bonds III
PLN Tahap II Tahun 2018 832,000 832,000 PLN II Year 2018
Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III
PLN Tahap II Tahun 2018 224,000 224,000 PLN II Year 2018
Obligasi Berkelanjutan III Shelf Registration Bonds III
PLN Tahap I Tahun 2018 1,278,500 1,278,500 PLN I Year 2018
Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III
PLN Tahap I Tahun 2018 750,000 750,000 PLN I Year 2018
Obligasi Berkelanjutan II Shelf Registration Bonds II
PLN Tahap III Tahun 2018 2,078,000 2,535,000 PLN III Year 2018
Sukuk Ijarah Berkelanjutan II Shelf Registration Sukuk Ijara II
PLN Tahap III Tahun 2018 594,500 698,500 PLN III Year 2018
Obligasi Berkelanjutan II Shelf Registration Bonds II
PLN Tahap II Tahun 2017 2,094,000 2,094,000 PLN II Year 2017
Sukuk Ijarah Berkelanjutan II Shelf Registration Sukuk Ijara II
PLN Tahap II Tahun 2017 611,000 611,000 PLN II Year 2017
Obligasi Berkelanjutan II Shelf Registration Bonds II
PLN Tahap I Tahun 2017 1,386,000 1,386,000 PLN I Year 2017
Sukuk Ijarah Berkelanjutan II Shelf Registration Sukuk Ijara II
PLN Tahap I Tahun 2017 214,000 214,000 PLN I Year 2017
Obligasi Berkelanjutan I Shelf Registration Bonds I
PLN Tahap II Tahun 2013 651,000 651,000 PLN II Year 2013
Sukuk Ijarah Berkelanjutan I Shelf Registration Sukuk Ijara I
PLN Tahap II Tahun 2013 108,000 108,000 PLN II Year 2013
Obligasi Berkelanjutan I Shelf Registration Bonds I
PLN Tahap I Tahun 2013 697,000 697,000 PLN I Year 2013
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/112 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI, SUKUK IJARAH DAN KIK - 28. BONDS PAYABLE, SUKUK IJARA AND KIK - EBA
EBA (lanjutan) LOANS (continued)

Obligasi dan sukuk ijarah (lanjutan) Bonds and sukuk ijara (continued)

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Surat Utang Jangka Global Medium-


Menengah Global – USD term Notes – USD
Penerbitan tahun 2020 22,500,000 23,388,000 Issued in 2020
Penerbitan tahun 2019 36,000,000 37,420,800 Issued in 2019
Penerbitan tahun 2018 45,000,000 46,776,000 Issued in 2018
Penerbitan tahun 2017 30,000,000 31,184,000 Issued in 2017
Penerbitan tahun 2012 15,000,000 15,592,000 Issued in 2012

Surat Utang Jangka Global Medium-


Menengah Global – EUR term Notes – EUR
Penerbitan tahun 2019 8,204,250 8,304,300 Issued in 2019
Penerbitan tahun 2018 8,204,250 8,304,300 Issued in 2018

Obligasi – JPY Bonds – JPY


Penerbitan tahun 2019 2,037,547 2,300,142 Issued in 2019

Obligasi Terjamin – USD Guaranteed Notes – USD


Penerbitan tahun 2007 4,324,680 4,495,361 Issued in 2007

Subjumlah 200,551,612 207,923,488 Subtotal


Biaya emisi belum diamortisasi (6,206,459) (6,589,067) Unamortised debt issuance costs

Jumlah 194,345,153 201,334,421 Total

Disajikan di laporan posisi keuangan Presented in consolidated


konsolidasian sebagai: statements of financial position:
Liabilitas jangka pendek 3,460,500 2,863,200 Current liabilities
Liabilitas jangka panjang 190,884,653 198,471,221 Non-current liabilities

Jumlah 194,345,153 201,334,421 Total

Obligasi ini diterbitkan sebesar harga nominal dalam The bonds were issued at nominal value and are
mata uang Rupiah dengan rincian sebagai berikut: denominated in Rupiah, with the following details:
Tingkat kupon/ Periode
imbalan ijarah pembayaran
per tahun/ bunga/
Coupon rate/ Interest
Pokok/ Periode pinjaman/ Ijara fee payment Wali amanat/
Principal Loan term per annum period Trustee

Obligasi Berkelanjutan IV Shelf Registration Bonds IV


PLN Tahap I Tahun 2020 PLN Phase I Year 2020
Seri A 312,000 8 September 2020 - 6.70% Series A
8 September 2025
Seri B 28,000 8 September 2020 - 7.25% Series B
8 September 2027
Seri C 158,000 8 September 2020 - 7.90% Kuartalan/ Bank Tabungan Series C
8 September 2030 Quarterly Negara
Seri D 841,000 8 September 2020 - 8.65% Series D
8 September 2035
Seri E 161,000 8 September 2020 - 8.86% Series E
8 September 2040
Subtotal 1,500,000

Sukuk Ijarah Berkelanjutan IV Shelf Registration Sukuk Ijarah IV


Tahap I Tahun 2020 PLN Phase I Year 2020
Seri A 39,000 8 September 2020 - 6.70% Series A
8 September 2025
Seri B 35,000 8 September 2020 - 7.25% Series B
8 September 2027
Seri C 200,000 8 September 2020 - 7.90% Kuartalan/ Bank Tabungan Series C
8 September 2030 Quarterly Negara
Seri D 56,000 8 September 2020 - 8.65% Series D
8 September 2035
Seri E 46,500 8 September 2020 - 8.86% Series E
8 September 2040
Subtotal 376,500
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/113 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI, SUKUK IJARAH DAN KIK - 28. BONDS PAYABLE, SUKUK IJARA AND KIK - EBA
EBA (lanjutan) LOANS (continued)

Obligasi dan sukuk ijarah (lanjutan) Bonds and sukuk ijara (continued)
Tingkat kupon/ Periode
imbalan ijarah pembayaran
per tahun/ bunga/
Coupon rate/ Interest
Pokok/ Periode pinjaman/ Ijara fee payment Wali amanat/
Principal Loan term per annum period Trustee

Obligasi Berkelanjutan III Shelf Registration Bonds III


PLN Tahap VII Tahun 2020 PLN Phase VII Year 2020
Seri B 99,155 6 Mei/May 2020 - 8.25% Kuartalan/ Bank Tabungan Series B
6 Mei/May 2025
Seri C 312,180 6 Mei/May 2020 - 8.55% Quarterly Negara Series C
6 Mei/May 2027
Seri D 1,009,100 6 Mei/May 2020 - 9.10% Series D
6 Mei/May 2030
Subtotal 1,420,435

Obligasi Berkelanjutan III Shelf Registration Bonds III


PLN Tahap VI Tahun 2020 PLN Phase VI Year 2020
Seri A 540,630 18 Februari/February 2020 - 7.20% Series A
18 Februari/February 2025
Seri B 672,500 18 Februari/February 2020 - 7.70% Series B
18 Februari/February 2027
Seri C 544,250 18 Februari/February 2020 - 8.00% Kuartalan/ Bank Tabungan Series C
18 Februari/February 2030 Quarterly Negara
Seri D 1,459,000 18 Februari/February 2020 - 8.70% Series D
18 Februari/February 2035
Seri E 1,596,050 18 Februari/February 2020 - 9.05% Series E
18 Februari/February 2040
Subtotal 4,812,430

Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijarah III


PLN Tahap VI Tahun 2020 PLN Phase VI Year 2020
Seri A 40,500 18 Februari/February 2020 - 7.70% Series A
18 Februari/February 2027
Seri B 3,500 18 Februari/February 2020 - 8.00% Kuartalan/ Bank Tabungan Series B
18 Februari/February 2030 Quarterly Negara
Seri C 9,000 18 Februari/February 2020 - 8.70% Series C
18 Februari/February 2035
Seri D 62,500 18 Februari/February 2020 - 9.05% Series D
18 Februari/February 2040
Subtotal 115,500

Obligasi Berkelanjutan III Shelf Registration Bonds III


PLN Tahap V Tahun 2019 PLN Phase V Year 2019
Seri A 795,700 1 Oktober/October 2019 - 7.90% Series A
1 Oktober/October 2024
Seri B 445,000 1 Oktober/October 2019 - 8.40% Series B
1 Oktober/October 2026
Seri C 6,200 1 Oktober/October 2019 - 8.60% Kuartalan/ Bank Tabungan Series C
1 Oktober/October 2029 Quarterly Negara
Seri D 166,000 1 Oktober/October 2019 - 9.40% Series D
1 Oktober/October 2034
Seri E 500,000 1 Oktober/October 2019 - 9.90% Series E
1 Oktober/October 2039
Subtotal 1,912,900

Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III


PLN Tahap V Tahun 2019 PLN Phase V Year 2019
Seri A 6,500 1 Oktober/October 2019 - 7.90% Series A
1 Oktober/October 2024
Seri B 10,000 1 Oktober/October 2019 - 8.40% Series B
1 Oktober/October 2026
Seri C 92,000 1 Oktober/October 2019 - 8.60% Kuartalan/ Bank Tabungan Series C
1 Oktober/October 2029 Quarterly Negara
Seri D 135,000 1 Oktober/October 2019 - 9.40% Series D
1 Oktober/October 2034
Seri E 554,000 1 Oktober/October 2019 - 9.90% Series E
1 Oktober/October 2039
Subtotal 797,500

Obligasi Berkelanjutan III Shelf Registration Bonds III


PLN Tahap IV Tahun 2019 PLN Phase IV Year 2019
Seri A 637,000 1 Agustus/August 2019 - 8.00% Series A
1 Agustus/August 2024
Seri B 315,250 1 Agustus/August 2019 - 8.50% Series B
1 Agustus/August 2026
Seri C 549,000 1 Agustus/August 2019 - 8.70% Kuartalan/ Bank Tabungan Series C
1 Agustus/August 2029 Quarterly Negara
Seri D 395,000 1 Agustus/August 2019 - 9.50% Series D
1 Agustus/August 2034
Seri E 1,057,370 1 Agustus/August 2019 - 9.98% Series E
1 Agustus/August 2039
Subtotal 2,953,620
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/114 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI, SUKUK IJARAH DAN KIK - 28. BONDS PAYABLE, SUKUK IJARA AND KIK - EBA
EBA (lanjutan) LOANS (continued)

Obligasi dan sukuk ijarah (lanjutan) Bonds and sukuk ijara (continued)

Tingkat kupon/ Periode


imbalan ijarah pembayaran
per tahun/ bunga/
Coupon rate/ Interest
Pokok/ Periode pinjaman/ Ijara fee payment Wali amanat/
Principal Loan term per annum period Trustee

Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III


PLN Tahap IV Tahun 2019 PLN Phase IV Year 2019
Seri A 274,000 1 Agustus/August 2019 - 8.00% Series A
1 Agustus/August 2024
Seri B 368,000 1 Agustus/August 2019 - 8.50% Series B
1 Agustus/August 2026
Seri C 20,000 1 Agustus/August 2019 - 8.70% Kuartalan/ Bank Tabungan Series C
1 Agustus/August 2029 Quarterly Negara
Seri D 49,000 1 Agustus/August 2019 - 9.50% Series D
1 Agustus/August 2034
Seri E 539,000 1 Agustus/August 2019 - 9.98% Series E
1 Agustus/August 2039
Subtotal 1,250,000

Obligasi Berkelanjutan III Shelf Registration Bonds III


PLN Tahap III Tahun 2019 PLN Phase III Year 2019
Seri B 1,212,000 19 Februari/February 2019 - 9.10% Series B
19 Februari/February 2024
Seri C 183,000 19 Februari/February 2019 - 9.35% Kuartalan/ Bank Tabungan Series C
19 Februari/February 2026 Quarterly Negara
Seri D 211,000 19 Februari/February 2019 - 9.60% Series D
19 Februari/February 2029
Seri E 263,000 19 Februari/February 2019 - 9.80% Series E
19 Februari/February 2034
Seri F 155,000 19 Februari/February 2019 - 9.95% Series F
19 Februari/February 2039
Subtotal 2,024,000

Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III


PLN Tahap III Tahun 2019 PLN Phase III Year 2019
Seri B 263,000 19 Februari/February 2019 - 9.10% Series B
19 Februari/February 2024
Seri C 204,000 19 Februari/February 2019 - 9.35% Kuartalan/ Bank Tabungan Series C
19 Februari/February 2026 Quarterly Negara
Seri D 45,000 19 Februari/February 2019 - 9.60% Series D
19 Februari/February 2029
Seri E 60,000 19 Februari/February 2019 - 9.80% Series E
19 Februari/February 2034
Seri F 28,000 19 Februari/February 2019 - 9.95% Series F
19 Februari/February 2039
Subtotal 600,000

Obligasi Berkelanjutan III Shelf Registration Bonds III


PLN Tahap II Tahun 2018 PLN Phase II Year 2018
Seri A 210,000 10 Oktober/October 2018 - 8.65% Series A
10 Oktober/October 2023
Seri B 483,000 10 Oktober/October 2018 - 9.00% Series B
10 Oktober/October 2025
Seri C 78,000 10 Oktober/October 2018 - 9.10% Kuartalan/ Bank Tabungan Series C
10 Oktober/October 2028 Quarterly Negara
Seri D 15,000 10 Oktober/October 2018 - 9.30% Series D
10 Oktober/October 2033
Seri E 46,000 10 Oktober/October 2018 - 9.65% Series E
10 Oktober/October 2038
Subtotal 832,000

Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III


PLN Tahap II Tahun 2018 PLN Phase II Year 2018
Seri A 114,000 10 Oktober/October 2018 - 8.65% Series A
10 Oktober/October 2023
Seri B 45,000 10 Oktober/October 2018 - 9.00% Series B
10 Oktober/October 2025
Seri C 15,000 10 Oktober/October 2018 - 9.10% Kuartalan/ Bank Tabungan Series C
10 Oktober/October 2028 Quarterly Negara
Seri D 50,000 10 Oktober/October 2018 - 9.65% Series D
10 Oktober/October 2038
Subtotal 224,000
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/115 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI, SUKUK IJARAH DAN KIK - 28. BONDS PAYABLE, SUKUK IJARA AND KIK - EBA
EBA (lanjutan) LOANS (continued)

Obligasi dan sukuk ijarah (lanjutan) Bonds and sukuk ijara (continued)

Tingkat kupon/ Periode


imbalan ijarah pembayaran
per tahun/ bunga/
Coupon rate/ Interest
Pokok/ Periode pinjaman/ Ijara fee payment Wali amanat/
Principal Loan term per annum period Trustee

Obligasi Berkelanjutan III Shelf Registration Bonds III


PLN Tahap I Tahun 2018 PLN Phase I Year 2018
Seri A 78,500 10 Juli/July 2018 - 7.80% Series A
10 Juli/July 2023
Seri B 442,000 10 Juli/July 2018 - 8.35% Series B
10 Juli/July 2025
Seri C 138,000 10 Juli/July 2018 - 8.40% Kuartalan/ Bank Tabungan Series C
10 Juli/July 2028 Quarterly Negara
Seri D 281,000 10 Juli/July 2018 - 8.90% Series D
10 Juli/July 2033
Seri E 339,000 10 Juli/July 2018 - 9.00% Series E
10 Juli/July 2038
Subtotal 1,278,500

Sukuk Ijarah Berkelanjutan III Shelf Registration Sukuk Ijara III


PLN Tahap I Tahun 2018 PLN Phase I Year 2018
Seri A 127,000 10 Juli/July 2018 - 7.80% Series A
10 Juli/July 2023
Seri B 150,000 10 Juli/July 2018 - 8.35% Series B
10 Juli/July 2025
Seri C 258,000 10 Juli/July 2018 - 8.40% Kuartalan/ Bank Tabungan Series C
10 Juli/July 2028 Quarterly Negara
Seri D 105,000 10 Juli/July 2018 - 8.90% Series D
10 Juli/July 2033
Seri E 110,000 10 Juli/July 2018 - 9.00% Series E
10 Juli/July 2038
Subtotal 750,000

Obligasi Berkelanjutan II Shelf Registration Bonds II


PLN Tahap III Tahun 2018 PLN Phase III Year 2018
Seri A - 22 Februari/February 2018 - 6,50% Series A
22 Februari/February 2023
Seri B 10,000 22 Februari/February 2018 - 6,80% Series B
22 Februari/February 2025
Seri C 341,000 22 Februari/February 2018 - 7,25% Kuartalan/ Bank Tabungan Series C
22 Februari/February 2028 Quarterly Negara
Seri D 362,000 22 Februari/February 2018 - 8,20% Series D
22 Februari/February 2033
Seri E 1,365,000 22 Februari/February 2018 - 8,75% Series E
22 Februari/February 2038
Subtotal 2,078,000

Sukuk Ijarah Berkelanjutan II Shelf Registration Sukuk Ijara II


PLN Tahap III Tahun 2018 PLN Phase III Year 2018
Seri A - 22 Februari/February 2018 - 6.50% Series A
22 Februari/February 2023
Seri B 88,000 22 Februari/February 2018 - 7.25% Kuartalan/ Bank Tabungan Series B
22 Februari/February 2028 Quarterly Negara
Seri C 57,500 22 Februari/February 2018 - 8.20% Series C
22 Februari/February 2033
Seri D 449,000 22 Februari/February 2018 - 8.75% Series D
22 Februari/February 2038
Subtotal 594,500

Obligasi Berkelanjutan II Shelf Registration Bonds II


PLN Tahap II Tahun 2017 PLN Phase II Year 2017
Seri B 201,000 3 November 2017 - 7.50% Kuartalan/ Bank Tabungan Series B
3 November 2024 Quarterly Negara
Seri C 800,000 3 November 2017 - 8.20% Series C
3 November 2027
Seri D 1,093,000 3 November 2017 - 8.70% Series D
3 November 2032
Subtotal 2,094,000

Sukuk Ijarah Berkelanjutan II Shelf Registration Sukuk Ijara II


PLN Tahap II Tahun 2017 PLN Phase II Year 2017
Seri B 121,000 3 November 2017 - 8.20% Kuartalan/ Bank Tabungan Series B
3 November 2027 Quarterly Negara
Seri C 490,000 3 November 2017 - 8.70% Series C
3 November 2032
Subtotal 611,000
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/116 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI, SUKUK IJARAH DAN KIK - 28. BONDS PAYABLE, SUKUK IJARA AND KIK - EBA
EBA (lanjutan) LOANS (continued)

Obligasi dan sukuk ijarah (lanjutan) Bonds and sukuk ijara (continued)

Seluruh obligasi ini tidak dijamin secara khusus, The bonds are not secured by specific collateral but
namun dijamin dengan seluruh aset Perusahaan, secured by all of the Company’s assets and the
serta hak pemegang obligasi adalah pari passu bondholders’ rights are pari passu without preference
tanpa hak khusus dengan hak-hak kreditur lain. to other creditors.

Perusahaan telah memenuhi pembatasan- The Company has complied with the restrictions
pembatasan yang ditentukan dalam perjanjian Wali specified within the agreements with the acting
Amanat masing-masing obligasi dan sukuk ijarah. Trustee of the corresponding bonds and sukuk ijara.

Dana yang diperoleh dari penerbitan obligasi dan The proceeds from the issuance of bonds payable and
sukuk ijarah digunakan untuk mendanai proyek sukuk ijarah are used to finance the transmission
transmisi, proyek distribusi, dan modal kerja. project, distribution project, and working capital.
Tingkat kupon/ Periode
imbalan ijarah pembayaran
per tahun/ bunga/
Coupon rate/ Interest
Pokok/ Periode pinjaman/ Ijara fee payment Wali amanat/
Principal Loan term per annum period Trustee

Obligasi Berkelanjutan II Shelf Registration Bonds II


PLN Tahap I Tahun 2017 PLN Phase I Year 2017
Seri B 169,000 11 Juli/July 2017 - 8.10% Kuartalan/ Bank Tabungan Series B
11 Juli/July 2024 Quarterly Negara
Seri C 1,217,000 11 Juli/July 2017 - 8.50% Series C
11 Juli/July 2027
Subtotal 1,386,000

Sukuk Ijarah Berkelanjutan II Shelf Registration Sukuk Ijara II


PLN Tahap I Tahun 2017 PLN Phase I Year 2017
Seri B 214,000 11 Juli/July 2017 - 8.50% Kuartalan/ Bank Tabungan Series B
11 Juli/July 2027 Quarterly Negara

Obligasi Berkelanjutan I Shelf Registration Bonds I


PLN Tahap II Tahun 2013 PLN Phase II Year 2013
Seri B 651,000 10 Desember/ 9.60% Kuartalan/ Bank Permata Series B
December 2013 - Quarterly
10 Desember/
December 2023

Sukuk Ijarah Berkelanjutan I Shelf Registration Sukuk Ijara I


PLN Tahap II Tahun 2013 PLN Phase II Year 2013
Seri B 108,000 10 Desember/ 9.60% Kuartalan/ Bank Permata Series B
December 2013 - Quarterly
10 Desember/
December 2023

Obligasi Berkelanjutan I Shelf Registration Bonds I


PLN Tahap I Tahun 2013 PLN Phase I Year 2013
Seri B 697,000 5 Juli/July 2013 - 8.25% Kuartalan/ Bank Permata Series B
5 Juli/July 2023 Quarterly

Jumlah 29,280,885 Total


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/117 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI, SUKUK IJARAH DAN KIK - 28. BONDS PAYABLE, SUKUK IJARA AND KIK - EBA
EBA (lanjutan) LOANS (continued)

Obligasi dan sukuk ijarah (lanjutan) Bonds and sukuk ijara (continued)

Rincian peringkat untuk seluruh obligasi dan Sukuk Rating details on all outstanding bonds and Sukuk
Ijarah yang dimiliki Perusahaan adalah sebagai Ijara bonds issued by the Company are as follows:
berikut:

30 Juni/ June 30, 2023


Peringkat/ Lembaga pemeringkat
Rating Rating agency

Obligasi/Bonds

Obligasi/Bonds idAAA

Obligasi Berkelanjutan I PLN Tahap I Tahun 2013


Shelf Registration Bonds I PLN Phase I Year 2013 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan I PLN Tahap II Tahun 2013
Shelf Registration Bonds I PLN Phase II Year 2013 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan II PLN Tahap I Tahun 2017
Shelf Registration Bonds II PLN Phase I Year 2017 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan II PLN Tahap II Tahun 2017
Shelf Registration Bonds II PLN Phase II Year 2017 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan II PLN Tahap III Tahun 2018
Shelf Registration Bonds II PLN Phase III Year 2018 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan III PLN Tahap I Tahun 2018
Shelf Registration Bonds III PLN Phase I Year 2018 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan III PLN Tahap II Tahun 2018
Shelf Registration Bonds III PLN Phase II Year 2018 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan III PLN Tahap III Tahun 2019
Shelf Registration Bonds III PLN Phase III Year 2019 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan III PLN Tahap IV Tahun 2019
Shelf Registration Bonds III PLN Phase IV Year 2019 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan III PLN Tahap V Tahun 2019
Shelf Registration Bonds III PLN Phase V Year 2019 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan III PLN Tahap VI Tahun 2020
Shelf Registration Bonds III PLN Phase VI Year 2020 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan III PLN Tahap VII Tahun 2020
Shelf Registration Bonds III PLN Phase VII Year 2020 idAAA PT Pemeringkat Efek Indonesia
Obligasi Berkelanjutan IV PLN Tahap I Tahun 2020
Shelf Registration Bonds IV PLN Phase I Year 2020 idAAA PT Pemeringkat Efek Indonesia

Sukuk Ijarah/Sukuk Ijara idAAA

Sukuk Ijarah Berkelanjutan I PLN Tahap II Tahun 2013


Shelf Registration Sukuk Ijara I PLN Phase II Year 2013 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan II PLN Tahap I Tahun 2017
Shelf Registration Sukuk Ijara II PLN Phase I Year 2017 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan II PLN Tahap II Tahun 2017
Shelf Registration Sukuk Ijara II PLN Phase II Year 2017 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan II PLN Tahap III Tahun 2018
Shelf Registration Sukuk Ijara II PLN Phase III Year 2018 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan III PLN Tahap I Tahun 2018
Shelf Registration Sukuk Ijara III PLN Phase I Year 2018 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan III PLN Tahap II Tahun 2018
Shelf Registration Sukuk Ijara III PLN Phase II Year 2018 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan III PLN Tahap III Tahun 2019
Shelf Registration Sukuk Ijara III PLN Phase III Year 2019 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan III PLN Tahap IV Tahun 2019
Shelf Registration Sukuk Ijara III PLN Phase IV Year 2019 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan III PLN Tahap V Tahun 2019
Shelf Registration Sukuk Ijara III PLN Phase V Year 2019 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan III PLN Tahap VI Tahun 2020
Shelf Registration Sukuk Ijara III PLN Phase VI Year 2020 idAAA(sy) PT Pemeringkat Efek Indonesia
Sukuk Ijarah Berkelanjutan IV PLN Tahap I Tahun 2020
Shelf Registration Sukuk Ijara IV PLN Phase I Year 2020 idAAA(sy) PT Pemeringkat Efek Indonesia
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/118 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI, SUKUK IJARAH DAN KIK - 28. BONDS PAYABLE, SUKUK IJARA AND KIK - EBA
EBA (lanjutan) LOANS (continued)

Surat Utang Jangka Menengah Global dan Global Medium-term Notes and Guaranteed Notes
Obligasi Terjamin

Rincian Surat Utang Jangka Menengah Global dan The details of Global Medium-term Notes and
Obligasi Terjamin dalam Dolar Amerika adalah Guaranteed Notes in US Dollars are as follows:
sebagai berikut:
Tingkat
Pokok/ Harga bunga/
Principal*) penerbitan/ Periode pinjaman/ Interest Wali amanat/
USD Issuing price Loan term rate Trustee

Surat utang Global medium-


jangka menengah term notes
Penerbitan tahun 2020 Issued in 2020
Jatuh tempo 2030 500,000,000 99.15% 30 Juni/June 2020 - 3.00% Deutsche Bank Trust Due in 2030
30 Juni/June 2030 Company Americas
Jatuh tempo 2050 1,000,000,000 98.28% 30 Juni/June 2020 - 4.00% Due in 2050
30 Juni/June 2050
Subjumlah 1,500,000,000 Subtotal

Penerbitan tahun 2019 Issued in 2019


Jatuh tempo 2029 700,000,000 99.39% 17 Juli/July 2019 - 3.88% Deutsche Bank Trust Due in 2029
17 Juli/July 2029 Company Americas
Jatuh tempo 2049 700,000,000 98.83% 17 Juli/July 2019 - 4.88% Due in 2049
17 Juli/July 2049
Jatuh tempo 2030 500,000,000 99.78% 5 November 2019 - 3.38% Deutsche Bank Trust Due in 2030
5 Februari/February 2030 Company Americas
Jatuh tempo 2050 500,000,000 99.57% 5 November 2019 - 4.38% Due in 2050
5 Februari/February 2050
Subjumlah 2,400,000,000 Subtotal

Surat utang Global medium-


jangka menengah term notes
Penerbitan tahun 2018 Issued in 2018
Jatuh tempo 2028 1,000,000,000 99.62% 21 Mei/May 2018 - 5.45% Deutsche Bank Trust Due in 2028
21 Mei/May 2028 Company Americas
Jatuh tempo 2029 500,000,000 99.00% 25 Oktober/October 2018 - 5.38% Due in 2029
25 Januari/January 2029
Jatuh tempo 2048 1,000,000,000 99.32% 21 Mei/May 2018 - 6.15% Deutsche Bank Trust Due in 2048
21 Mei/May 2048 Company Americas
Jatuh tempo 2049 500,000,000 99.29% 25 Oktober/October 2018 - 6.25% Due in 2049
25 Oktober/October 2049
Subjumlah 3,000,000,000 Subtotal

Penerbitan tahun 2017 Issued in 2017


Jatuh tempo 2027 1,500,000,000 98.99% 15 Mei/May 2017 - 4.13% Deutsche Bank Trust Due in 2027
15 Mei/May 2027 Company Americas
Jatuh tempo 2047 500,000,000 98.51% 15 Mei/May 2017 - 5.25% Due in 2047
15 Mei/May 2047
Subjumlah 2,000,000,000 Subtotal

Penerbitan tahun 2012 Issued in 2012


Jatuh tempo 2042 1,000,000,000 98.51% 24 Oktober/October 2012 - 5.25% Deutsche Bank Trust Due in 2042
24 Oktober/October 2042 Company Americas

Obligasi terjamin Guaranteed notes


Penerbitan tahun 2007 Issued in 2007
Jatuh tempo 2037 288,312,000 98.59% 28 Juni/June 2007 - 7.88% Deutsche Bank Trust Due in 2037
29 Juni/June 2037 Company Americas
Jumlah 10,188,312,000 Total

Rincian Surat Utang Jangka Menengah Global The details of Global Medium Term Notes in Euro are
dalam Euro adalah sebagai berikut: as follows:
Tingkat
Pokok/ Harga bunga/
Principal*) penerbitan/ Periode pinjaman/ Interest Wali amanat/
EUR Issuing price Loan term rate Trustee

Surat utang Global medium-


jangka menengah term notes
Penerbitan tahun 2019 Issued in 2019
Jatuh tempo 2031 500,000,000 99.42% 5 November 2019 - 1.88% Deutsche Bank Trust Due in 2031
5 November 2031 Company Americas
Penerbitan tahun 2018 Issued in 2018
Jatuh tempo 2025 500,000,000 99.22% 25 Oktober/October 2018 - 2.88% Deutsche Bank Trust Due in 2025
25 Oktober/October 2025 Company Americas
Jumlah 1,000,000,000 Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/119 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI, SUKUK IJARAH DAN KIK - 28. BONDS PAYABLE, SUKUK IJARA AND KIK - EBA
EBA (lanjutan) LOANS (continued)

Surat Utang Jangka Menengah Global dan Global Medium-term Notes and Guaranteed Notes
Obligasi Terjamin (lanjutan) (continued)

Rincian Surat Utang Jangka Menengah Global The details of Global Medium-Term Notes in
dalam Yen Jepang adalah sebagai berikut: Japanese Yen are as follows:

Tingkat
Pokok/ Harga bunga/
Principal*) penerbitan/ Periode pinjaman/ Interest Wali amanat/
JPY Issuing price Loan term rate Trustee

Surat utang Global medium-


jangka menengah term notes
Penerbitan tahun 2019 Issued in 2019
Jatuh tempo 2024 18,500,000,000 100% 20 September 2019 - 0.87% Sumitomo Mitsui Due in 2024
20 September 2024 Banking Corporation
Jatuh tempo 2029 1,000,000,000 100% 20 September 2019 - 1.05% Due in 2029
20 September 2029
Jumlah 19,500,000,000 Total

Perusahaan memenuhi pembatasan-pembatasan The Company complied with the restrictions specified
yang ditentukan dalam perjanjian Wali Amanat. within the agreements with the acting Trustee.

Dana yang diperoleh dari penerbitan Surat Utang The proceeds from the Global Medium-Term Notes
Jangka Menengah Global dan Obligasi Terjamin ini and Guaranteed Notes issued were used to fund the
digunakan untuk mendanai kebutuhan investasi capital expenditure requirements in connection with
program percepatan pembangunan fasilitas tenaga the fast track program, regular construction and for
listrik, konstruksi rutin, dan untuk tujuan umum general corporate purposes.
korporasi.

Rincian peringkat untuk seluruh surat utang jangka Rating details on all outstanding global medium-term
menengah global, obligasi terjamin, dan Japanese notes, guaranteed notes, and the Japanese Yen bond
Yen bond yang dimiliki Perusahaan adalah sebagai owned by the Company are as follows:
berikut:

Lembaga pemeringkat/Rating agency


Moody’s Investor Standard and Japan Credit
Service, Inc., Poor’s Fitch Rating

Surat utang jangka menengah global/


Global medium term notes
Penerbitan tahun 2020/Issued in 2020 Baa2 BBB BBB n/a
Penerbitan tahun 2019/Issued in 2019 Baa2 BBB BBB n/a
Penerbitan tahun 2018/Issued in 2018 Baa2 n/a BBB n/a
Penerbitan tahun 2017/Issued in 2017 Baa2 n/a BBB n/a
Penerbitan tahun 2012/Issued in 2012 Baa2 BBB BBB n/a

Obligasi terjamin/Guaranteed notes


Penerbitan tahun 2007/Issued in 2007 Baa2 BBB BBB n/a

Obligasi dalam Yen Jepang/


Japanese Yen Bond
Penerbitan tahun 2019/Issued in 2019 Baa2 BBB n/a BBB+
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/120 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

29. UTANG LISTRIK SWASTA 29. ELECTRICITY PURCHASE PAYABLES

Akun ini merupakan utang listrik swasta yang This account represents electricity purchase payables,
direstrukturisasi melalui renegosiasi dengan IPP. which were restructured through renegotiation with the
IPPs.

Rincian berdasarkan pemasok dan jadwal Details according to creditors and payment schedules
pembayaran pokok adalah sebagai berikut: are as follows:

a. Berdasarkan pemasok a. By creditor

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

PT Paiton Energy PT Paiton Energy


2023: USD336.968.335 2023: USD336,968,335
2022: USD352.640.174 5,054,523 5,498,365 2022: USD352,640,174
PT Jawa Power PT Jawa Power
2023: USD46.565.106 2023: USD46,565,106
2022: USD47.612.923 698,479 742,381 2022: USD47,612,923

Jumlah 5,753,002 6,240,746 Total

Dikurangi: bagian jangka pendek 523,532 528,890 Less: current portion

Bagian jangka panjang 5,229,470 5,711,856 Long-term portion

b. Berdasarkan jadwal pembayaran b. By instalment schedule

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Dibayarkan: Payable:
Dalam satu tahun 523,532 528,890 Within one year
Pada tahun kedua 554,764 560,104 In the second year
Pada tahun ketiga 588,632 593,897 In the third year
Pada tahun keempat 625,488 630,606 In the fourth year
Setelah lima tahun 3,460,586 3,927,249 After five years

Jumlah 5,753,002 6,240,746 Total

Utang kepada PT Paiton Energy dan PT Jawa Payables to PT Paiton Energy and PT Jawa Power
Power dikenakan bunga sebesar 4,81% dan 18,45% bear annual interest of 4.81% and 18.45%, and are
yang dibayar dalam 360 kali angsuran bulanan sejak payable in 360 monthly instalments from January 1,
1 Januari 2002 sampai dengan 1 Desember 2031. 2002 until December 1, 2031.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/121 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

30. UTANG USAHA 30. TRADE PAYABLES

Akun ini merupakan liabilitas sehubungan dengan This account represents payables arising from
pembelian tenaga listrik, bahan bakar, barang dan purchases of electricity, fuel, goods and services.
jasa.

Rincian utang usaha adalah sebagai berikut: Details of trade payables are as follows:

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022
Pihak berelasi Related parties
Pembelian bahan bakar, Purchase of fuel,
barang dan jasa 9,086,167 10,715,011 goods and services
Pembelian tenaga listrik 5,454,325 4,497,062 Purchase of electricity

Subjumlah 14,540,492 15,212,073 Subtotal

Pihak ketiga Third parties


Pembelian bahan bakar, Purchase of fuel,
barang dan jasa 23,869,678 18,517,634 goods and services
Pembelian tenaga listrik 16,454,929 17,353,555 Purchase of electricity

Subjumlah 40,324,607 35,871,189 Subtotal

Jumlah 54,865,099 51,083,262 Total

Rincian utang usaha dalam mata uang asing adalah Details of trade payables in foreign currencies are as
sebagai berikut: follows:

30 Juni/ June 30, 31 Desember/ December 31,


2023 2022
Dalam mata Dalam mata
uang asing/ uang asing/
In foreign Ekuivalen Rp/ In foreign Ekuivalen Rp/
currencies*) Rp equivalent currencies*) Rp equivalent

USD 1,283,154,284 19,247,314 1,339,342,186 20,883,024 USD


Lain-lain**) 11,684,105 175,262 11,278,625 175,856 Others**)

Jumlah 19,422,576 21,058,880 Tota

*) Dalam jumlah penuh *) In full amount


**) Utang usaha dalam mata uang lainnya disajikan dalam jumlah **) Trade payables in other currencies are presented in USD
setara USD, menggunakan kurs tanggal pelaporan equivalents using the exchange rate prevailing at the reporting
date

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/122 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

31. UTANG LAIN-LAIN 31. OTHER PAYABLES

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022
Acquisition of property,
Perolehan aset tetap dan pekerjaan plant and equipment
dalam pelaksanaan and construction in progress
Rupiah 6,273,046 5,519,163 Rupiah
USD 1,907,012 2,133,890 USD
EUR 203,381 429,226 EUR
JPY 430,452 316,598 JPY
Pemerintah daerah 2,491,202 2,317,377 Local government
Uang muka penjualan Advances received on sale
tenaga listrik 1,537,495 1,464,068 of electricity
Karyawan 520,661 80,568 Employees
Lain-lain 2,091,684 1,427,269 Others

Jumlah 15,454,932 13,688,159 Total

Dikurangi: bagian jangka pendek 14,698,052 13,016,633 Less: current portion

Bagian jangka panjang 756,880 671,526 Non-current portion

Pemerintah Daerah Local Government

Utang kepada Pemerintah Daerah merupakan The payables to Local Government represent the
jumlah yang ditagih Perusahaan dari pelanggan amount collected by the Company from the customers
untuk pajak penerangan jalan umum. Selanjutnya for street lighting taxes. This is subsequently remitted
jumlah yang dipungut akan diteruskan kepada to the respective Local Government.
Pemerintah Daerah.

Uang muka penjualan tenaga listrik Advances received on sale of electricity

Akun ini merupakan kas yang diterima atas This account represents cash received from the sale
penjualan listrik prabayar. of prepaid electricity.

Karyawan Employees

Utang kepada karyawan terutama merupakan Payable to employees mainly represents receipt of
penerimaan di muka atas cicilan penjualan rumah advance instalment payments from employees related
dinas. to house instalments.

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.

32. UTANG PAJAK 32. TAXES PAYABLE

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

PPN 1,554,900 1,222,415 VAT


PPh Badan 3,658,288 347,673 CIT
Pajak penghasilan Income taxes
Pasal 21 990,314 296,379 Article 21
Pasal 22 111,567 98,080 Article 22
Pasal 4(2) 83,182 135,721 Article 4(2)
Pasal 23 dan 26 116,077 155,987 Articles 23 and 26
Pasal 15 15,824 28,879 Article 15
Lain-lain 2,177 648 Others

Jumlah 6,532,329 2,285,782 Total


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/123 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

33. BIAYA MASIH HARUS DIBAYAR 33. ACCRUED EXPENSES


30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Bunga dan beban keuangan Interest and financing charges


Pihak berelasi Related parties
Utang bank 352,232 313,896 Bank loans
Utang penerusan pinjaman 307,448 274,072 Two-step loans

Jumlah pihak berelasi 659,680 587,968 Total related parties

Pihak ketiga Third parties


Utang obligasi dan sukuk ijarah 2,322,065 2,205,774 Bonds payable and sukuk ijara
Utang bank 1,127,130 974,173 Bank loans
Utang bunga sewa 279,367 676,380 Lease liability interest
Utang listrik swasta 41,702 44,834 Electricity purchase payables

Jumlah pihak ketiga 3,770,264 3,901,161 Total third parties

Subjumlah 4,429,944 4,489,129 Subtotal

Biaya operasional 3,331,357 2,864,673 Operational charges

Jumlah 7,761,301 7,353,802 Total

Rincian biaya masih harus dibayar dalam mata uang Details of accrued expenses in foreign currencies are
asing adalah sebagai berikut: as follows:

30 Juni/ June 30, 31 Desemebr/ December 31,


2023 2022
Dalam mata Dalam mata
uang asing/ uang asing/
In foreign Ekuivalen Rp/ In foreign Ekuivalen Rp/
currencies*) Rp equivalent currencies*) Rp equivalent

USD 197,000,852 2,955,013 181,953,030 2,837,012 USD


JPY 3,356,981,110 350,770 6,327,880,061 746,411 JPY
EUR 19,131,693 313,922 6,739,621 111,936 EUR
Lain-lain**) - - - - Others**)

Jumlah 3,619,705 3,695,359 Total

*) Dalam jumlah penuh *) In full amount


**) Biaya masih harus dibayar dalam mata uang asing lainnya **) Accrued expenses denominated in other foreign currencies are
disajikan setara USD dengan menggunakan kurs tanggal presented as USD equivalents using the exchange rates prevailing
pelaporan at the reporting date

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.

34. UANG JAMINAN LANGGANAN 34. CUSTOMER SECURITY DEPOSITS

Akun ini merupakan uang jaminan langganan yang This account represents customer security deposits
ditentukan berdasarkan besar daya dan golongan determined based on power supply and electricity
tarif. Uang jaminan langganan akan dikembalikan tariff. Customer security deposits will be refunded, net
apabila pelanggan berhenti menjadi pelanggan, of unpaid electricity bills, upon discontinuation of
dengan memperhitungkan rekening listrik belum customers’ subscriptions.
dibayar.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/124 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

35. UTANG BIAYA PROYEK 35. PROJECT COST PAYABLES

Akun ini merupakan utang kepada kontraktor atas This account represents payable to contractors arising
biaya konstruksi dan pengadaan material. Akun ini from construction expense and purchases of
akan direklasifikasi ke akun penerusan pinjaman materials. This account will be reclassified into the
pada saat penerbitan Withdrawal Authorisation atau two-step loans account at the issuance of the
dokumen lain yang sejenis. Withdrawal Authorisation or other similar documents.

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Nama proyek Project name


PLTU Kalselteng 2 (2x100 MW) 1,810,920 2,073,066 PLTU Kalselteng 2 (2x100 MW)
Lain-lain 11,054 23,445 Others

Jumlah 1,821,974 2,096,511 Total

36. PENJUALAN TENAGA LISTRIK 36. SALES OF ELECTRICITY

Penjualan tenaga listrik berdasarkan pelanggan Sales of electricity by customer are as follows:
adalah sebagai berikut:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Pihak berelasi (Catatan 51) Related parties (Note 51)


Entitas yang berhubungan
dengan Pemerintah 10,704,316 9,224,837 Government related entities

Pihak ketiga Third parties


Umum 148,228,234 140,493,125 Public
TNI dan Polri 1,039,013 832,963 TNI and Polri

Subjumlah 149,267,247 141,326,088 Subtotal

Jumlah 159,971,563 150,550,925 Total

Masa uji coba - (10) Commissioning test period

Jumlah, bersih 159,971,563 150,550,915 Total, net

Pendapatan sebesar Rp159,971,563 (2022: Revenue amounted to Rp159,971,563 (2022:


Rp150,550,915) diakui sepanjang waktu. Rp150,550,915) is recognised overtime.

Pengujian dan masa uji coba (commissioning test) Testing and commissioning (commissioning test) are a
merupakan serangkaian kegiatan pemeriksaan dan series of inspection and testing activities for electrical
pengujian instalasi listrik yang telah selesai installations that have been completed and are going
dikerjakan dan hendak dioperasikan. Beban dan into operation. The costs and revenues from the sale
pendapatan atas penjualan tenaga listrik yang of electricity that occurred during the commissioning
terjadi pada masa uji coba dikapitalisasi ke aset test are capitalised into construction in progress
dalam pembangunan dikarenakan instalasi listrik because the electrical installation has not yet been
belum beroperasi secara komersial. commercially operated.

Penjualan tenaga listrik untuk tahun 2023 dan 2022 Sales of electricity for the years 2023 and 2022 are
didasarkan pada Tarif Dasar Listrik, yang ditetapkan based on the Basic Electricity Tariff determined by the
oleh Pemerintah dan Pemerintah Daerah, sebagai Government and Local Government as follows:
berikut:
• Peraturan Menteri ESDM No. 28 Tahun 2016 • Regulation of the MoEMR No. 28 Year 2016 most
sebagaimana terakhir diubah dengan Peraturan recently amended by Regulation of the MoEMR
Menteri ESDM No. 3 Tahun 2020. No. 3 Year 2020.
• Peraturan Gubernur Kepulauan Riau No. 21 • Regulation of the Governor of Riau Islands No. 21
Tahun 2017 tentang tarif tenaga listrik yang Year 2017, regarding the tariff of electricity
disediakan oleh PLN Batam. provided by PLN Batam.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/125 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

36. PENJUALAN TENAGA LISTRIK (lanjutan) 36. SALES OF ELECTRICITY (continued)

Berdasarkan Surat dari Kementerian Energi dan Based on the letter of the Ministry of Energy and
Sumber Daya Mineral (“ESDM”) No. T- Mineral Resources (“MoEMR”) No. T-
162/TL.04/MEM.L/2022 tanggal 2 Juni 2022, perihal 162/TL.04/MEM.L/2022 dated June 2, 2022, regarding
penyesuaian tarif tenaga listrik (tariff adjustment) electricity tariff adjustment for the period July until
periode Juli - September 2022, dinyatakan bahwa September 2022, stating electricity tariff adjustment for
terdapat penyesuaian tarif tenaga listrik (tariff the period July until September 2022 for the
adjustment) periode Juli - September 2022 untuk customers segment of R-2/TR, R-3/TR and
golongan pelanggan R-2/TR, R-3/TR, dan government class of customers, with detailed as
Pemerintah dengan rincian sebagai berikut: follows:

Penyesuaian tarif tenaga listrik/


Electricity tariff adjustment
Januari – Juni/ Juli – Desember/
January - June 2022*) July – December 2022

R-2/TR Rp1,444.70/kWh Rp1,699.53/kWh


R-3/TR Rp1,444.70/kWh Rp1,699.53/kWh
P-1/TR Rp1,444.70/kWh Rp1,699.53/kWh
P-2/TM
WBP K x Rp1,035.78/kWh K x Rp1,415.01/kWh
LWPB Rp1,035.78/kWh Rp1,415.01/kWh
kVarh Rp1,114.74/kVArh Rp1,522.88/kVArh
P-3/TR Rp1,444.70/kWh Rp1,699.53/kWh

*) Penyesuaian tarif tenaga listrik bulan Januari sampai dengan *) Electricity tariff adjustment for January up to March 2022 based on
Maret 2022 sesuai surat dari ESDM No. T- MoEMR letter No. T-548/TL.04/MEM.L/2021 dated December 31,
548/TL.04/MEM.L/2021 tanggal 30 Desember 2021 sedangkan 2021 while for April up to June 2022 based on MoEMR letter No. T-
bulan April sampai dengan Juni 2022 sesuai surat dari ESDM 65/TL.04/MEM.L/2022 dated February 24, 2022
No. T-65/TL.04/MEM.L/2022 tanggal 24 Februari 2022

Tidak terdapat penyesuaian tarif sampai dengan 30 There is no electricity tariff adjustment until June 30,
Juni 2023 untuk golongan pelanggan non-subsidi 2023 for other non-subsidy customers.
lainnya.

Grup tidak memiliki penjualan kepada pelanggan The Group has no single customer from which it
dengan jumlah melebihi 10% dari total pendapatan generates revenue of more than 10% of total revenue.
usaha.

37. SUBSIDI LISTRIK PEMERINTAH 37. GOVERNMENT ELECTRICITY SUBSIDY

Pendapatan subsidi merupakan pendapatan dari Subsidy revenue represents the revenue from the
Pemerintah Indonesia atas selisih antara biaya yang Government of Indonesia for the difference between
diperbolehkan ditambah marjin 7% dengan harga jual allowable cost plus 7% margin with actual sales price
aktual per masing-masing golongan tarif kecuali untuk for each tariff group except for tariff groups which
golongan tarif yang telah mendapatkan penyesuaian received automatic tariff adjustment based on MoEMR
tarif otomatis menurut Peraturan Menteri ESDM No. 3 Regulation No. 3 Year 2020 regarding the fourth
Tahun 2020 tentang perubahan ke-4 atas Peraturan amendment of MoEMR Regulation No. 28 Year 2016
Menteri ESDM No. 28 Tahun 2016 tentang tarif regarding electricity tariff provided by PT PLN
tenaga listrik yang disediakan oleh PT PLN (Persero). (Persero).
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/126 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

37. SUBSIDI LISTRIK PEMERINTAH (lanjutan) 37. GOVERNMENT ELECTRICITY SUBSIDY (continued)

Pemerintah Republik Indonesia memberikan subsidi The Government of the Republic of Indonesia
listrik kepada pelanggan melalui Perusahaan. Tata provided electricity subsidy to customers through the
cara penghitungan dan pembayaran subsidi listrik Company. The procedure for calculation and
tahun anggaran 2022 dan 2021 menggunakan payment of the electricity subsidy for budget years
Peraturan Menteri Keuangan No. 178/PMK.02/2021, 2022 and 2021 use Minister of Finance Regulation
tanggal 7 Desember 2021. Subsidi listrik dihitung dari No. 178/PMK.02/2021, dated December 7, 2021.
selisih negatif antara harga jual tenaga listrik rata-rata The electricity subsidy is calculated from the
(Rp/kWh) dari masing-masing golongan tarif dikurangi negative difference between the average sales
biaya pokok penyediaan tenaga listrik (Rp/kWh) pada prices (Rp/kWh) of each tariff group less the cost of
tegangan di masing-masing golongan tarif dikalikan electricity supplies (Rp/kWh) on the voltage at each
volume penjualan (kWh) untuk setiap golongan tarif. tariff group multiplied by the electricity sales volume
Biaya pokok penyediaan tenaga listrik dihitung (kWh) for each tariff group. The cost of electricity
berdasarkan formula yang ditetapkan oleh Direktorat supplies is computed based on the formula, which is
Jenderal Ketenagalistrikan, di bawah Kementerian determined by the Directorate General of Electricity,
ESDM. under the Ministry of ESDM.

Berdasarkan Surat Pengesahan Daftar Isian Based on Approval Letter of Budget Performance
Pelaksanaan Anggaran (“DIPA”) No. SP.DIPA- List (“DIPA”) No. SP.DIPA-999.07.1.979321/2023
999.07.1.979321/2023 dan No. SP.DIPA- and No. SP.DIPA-999.07.1.979321/2022 second
999.07.1.979321/2022 revisi ke-2, pagu tertinggi revision, the electricity subsidy ceiling for budget
subsidi listrik tahun anggaran 2023 dan 2022 year 2023 and 2022 amounted to Rp72,576,859 and
ditetapkan masing-masing sebesar Rp72.576.859 Rp56,400,423, respectively. The ceiling amount
dan Rp56.400.423. Pagu tertinggi tersebut termasuk includes 7% margin above the costs of electricity
7% marjin di atas biaya pokok penyediaan tenaga supply.
listrik.

Besarnya subsidi listrik dalam satu tahun anggaran The amount of the electricity subsidy within a budget
secara final ditetapkan berdasarkan hasil audit atas year is finalised based on the result of the compliance
ketaatan penggunaan subsidi listrik yang dilakukan audit of the usage of the electricity subsidy performed
oleh auditor yang ditunjuk Direktorat Jenderal by an auditor assigned by the Directorate General of
Anggaran, di bawah Kementerian Keuangan. Budget under the Ministry of Finance.

Pendapatan subsidi listrik dirinci selama tahun The details of revenue from electricity subsidy during
berjalan sebagai berikut: the years are as follows:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Piutang subsidi listrik Receivables for electricity subsidy


per 31 Desember 2022 4,677,328 1,974,633 as at December 31, 2022
Subsidi listrik (Catatan 51) 32,069,605 26,189,358 Electricity subsidy (Note 51)

Realisasi penerimaan subsidi tahun Realisation of subsidy from


anggaran berjalan: current year budget:
Penerimaan tunai (26,097,738) (21,270,989) Cash received
Saling hapus dengan kelebihan Offset with excess
penerimaan subsidi tahun subsidy receipt from
anggaran sebelumnya - - prior year budget

Receivables for electricity


Piutang subsidi listrik (Catatan 16) 10,649,195 6,893,001 subsidy (Note 16)
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/127 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

38. PENDAPATAN USAHA LAIN-LAIN 38. OTHER REVENUES

2023 2022
(Enam Bulan/ (Enam Bulan/
Six Months) Six Months)

Jaringan dan jasa telekomunikasi 1,201,661 975,240 Telecommunication network and service
Penjualan batubara 1,694,108 1,372,622 Coal sales
jasa pemeliharaan 355,153 246,965 Maintenance service
Sewa transformator 260,785 226,103 Transformer rental
Perubahan daya tersambung dan Upgrading of electricity power and
administrasi 66,524 23,368 administration fees
Lain-lain 458,954 466,569 Others

Jumlah 4,037,185 3,310,867 Total

Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.

39. BEBAN BAHAN BAKAR DAN PELUMAS 39. FUEL AND LUBRICANTS EXPENSE
2023 2022
(Enam Bulan/ (Enam Bulan/
Six M onths) Six M onths)

Bahan bakar minyak Fuel


High speed diesel 15,319,675 15,655,490 High speed diesel
Fuel m arine oil 644,891 643,361 Fuel m arine oil
Lain - lain 113,553 97,169 Others

Subjum lah 16,078,119 16,396,020 Sub total

Bahan Bakar - Non Minyak Non - oil fuel


Gas alam 22,369,715 20,454,672 Natural gas
Batubara 32,836,338 29,966,765 Coal
Panas bum i 2,095,112 1,817,198 Geotherm al
Air 215,464 178,152 Water
Biom as s a 136,239 148,594 Biom assa

Subjum lah 57,652,868 52,565,381 Sub total

Minyak pelum as 121,895 112,256 Lub ricants


Jumlah 73,852,882 69,073,657 Total

Tidak ada pembelian dari pemasok tunggal yang No purchases from a single supplier exceeded 10% of
melebihi 10% dari jumlah pendapatan. the total revenues.
Lihat Catatan 51 untuk informasi rincian transaksi Refer to Note 51 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/128 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

40. BEBAN PEMBELIAN TENAGA LISTRIK 40. PURCHASED ELECTRICITY


Akun ini termasuk pembelian tenaga listrik dari IPP This account includes the purchase of electricity from
terkait PPA dan ESC, pembelian tenaga listrik certain IPPs in relation to PPAs and ESCs, the
selama masa uji coba dan pembelian tenaga listrik purchase of electricity during the commissioning stage
dari kelebihan produksi dari IPP tertentu. Rinciannya and the purchase of excess electricity generated by
adalah sebagai berikut: certain IPPs. The details are as follows:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Pihak berelasi Related parties


S2P 6,992,304 7,197,189 S2P
SGPJB 5,065,051 5,059,445 SGPJB
Lain-lain 8,179,226 3,741,476 Others

Subjumlah 20,236,581 15,998,110 Subtotal


Pihak ketiga Third parties
PT Paiton Energy 6,622,623 6,996,360 PT Paiton Energy
PT Jawa Power 4,939,291 4,588,970 PT Jawa Power
PT Bhumi Jati Power 6,508,135 - PT Bhumi Jati Power
PT Bhimasena Power Indonesia 5,918,128 - PT Bhimasena Power Indonesia
Lain-lain 29,002,863 31,010,330 Others

Subjumlah 52,991,040 42,595,660 Subtotal

Jumlah 73,227,621 58,593,770 Total

41. BEBAN SEWA 41. LEASE EXPENSES

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Beban yang berkaitan dengan sewa Expense relating to variable lease


dengan pembayaran variabel yang payments not included in
tidak termasuk dalam utang sewa 491,237 1,491,107 lease liabilities
Beban yang berkaitan dengan
sewa jangka pendek 267,287 413,201 Expense relating to short-term leases
Beban yang berkaitan dengan Expense relating to leases of
sewa nilai rendah 63,263 69,411 low value assets

Jumlah 821,787 1,973,719 Total


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/129 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

42. BEBAN PEMELIHARAAN 42. MAINTENANCE EXPENSES

Akun ini merupakan beban yang timbul dari This account represents spare parts used and
pemakaian material dan jasa borongan untuk contractor fees for maintenance purposes. The details
keperluan pemeliharaan. Rincian beban of maintenance expenses are as follows:
pemeliharaan adalah sebagai berikut:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Jasa borongan 9,696,224 8,620,490 Contractor fees


Pemakaian material 2,344,003 1,783,980 Spare parts used

Jumlah 12,040,227 10,404,470 Total

43. BEBAN KEPEGAWAIAN 43. PERSONNEL EXPENSES

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Jasa produksi dan insentif


prestasi kerja 1,940,488 2,931,926 Bonus and performance incentives
Imbalan kerja (Catatan 49) 3,504,805 2,830,245 Employee benefits (Note 49)
Gaji 2,654,363 2,415,332 Salaries
Tunjangan 4,304,503 1,931,461 Allowances
Lain-lain 3,254,452 1,551,326 Others

Jumlah 15,658,611 11,660,290 Total

44. BEBAN USAHA LAIN-LAIN 44. OTHER OPERATING EXPENSES

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Honorarium 855,953 558,787 Honorarium


Pengelolaan pelanggan 53,432 11,0766 Customer maintenance
Pembacaan meter 450,228 454,536 Meter reading
Teknologi informasi 90,136 59,659 Technological information
Amortisation of intangible
Amortisasi aset takberwujud (Catatan 12) 252,002 160,578 assets (Note 12)
Penyisihan kerugian Allowance of expected
kredit ekspektasian piutang 162,860 294,024 credit losses of receivables
Lain-lain 2,158,601 1,399,281 Others

Jumlah 4,023,212 3,037,631 Total


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/130 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

45. BEBAN KEUANGAN 45. FINANCE COSTS

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Pihak berelasi Related parties


Utang bank 1,020,486 856,389 Bank loans
Penerusan pinjaman 448,027 292,225 Two-step loans
Utang kepada Pemerintah 84,866 107,545 Government loans
Instrumen derivatif *) 951,983 (289,554) Derivative instruments *)

Subjumlah 2,505,362 966,605 Subtotal

Pihak ketiga Third parties


Utang obligasi 4,299,239 5,507,831 Bonds payable
Utang bank 2,550,799 1,320,013 Bank loans
Utang sewa (Catatan 26) 1,322,598 1,536,054 Lease liabilities (Note 26)
Utang listrik swasta 194,043 200,321 Electricity purchase payables
Lain-lain 159,230 198,306 Others

Subjumlah 8,525,909 8,762,525 Subtotal

Jumlah 11,031,271 9,729,130 Total

*) (Pendapatan)/beban keuangan dari transaksi instrumen *) Finance (income)/expense from transaction of derivative
derivatif. instrument.

46. PENGHASILAN/(BEBAN) LAIN-LAIN - BERSIH 46. OTHER INCOME/(EXPENSES) - NET

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Bagian atas laba bersih entitas asosiasi Share in net income of associates
dan ventura bersama (Catatan 9) 1,650,142 2,828,251 and joint ventures (Note 9)
Penghasilan denda administrasi 1,344,063 807,438 Administrative penalty income
Kenaikan nilai wajar Increase in the fair value
properti investasi (Catatan 8) - (34,769) of investment properties (Note 8)
Keuntungan penjualan aset tidak Gain on sale of assets not used
digunakan dalam operasi (Catatan 6) 7,087 9,883 in operations (Note 6)
Pemulihan/(penyisihan) atas ketidakpastian Reversal/(provision) against uncertain
dalam perlakuan pajak (Catatan 19) (1,510,604) (2,923,901) tax treatment (Note 19)
Penghasilan jasa dan klaim 8,547 14,809 Claim and service income
Provision for impairment of property,
Penurunan nilai aset tetap (Catatan 6) - - plant and equipment (Note 6)
Kerugian penurunan nilai
aset tetap tidak digunakan Loss on impairment of assets not used
dalam operasi (Catatan 6) (166,687) (91,053) in operations (Note 6)
Program pemberdayaan lingkungan (206,344) (175,700) Community development programs
Beban penelitian (33,782) (20,528) Research expenses
Penyesuaian kompensasi berdasarkan Adjustment of compensation based on
hasil audit BPK - (677,136) audit result by BPK
Lain-lain (1,211,188) 588,996 Others

Jumlah (118,766) 326,290 Total

*) Direklasifikasikan kembali, lihat Catatan 58 *) As reclassified, see Note 58


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/131 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN 47. INCOME TAX

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)
Beban pajak kini Current tax
Perusahaan 2,646,702 625,954 The Company
Entitas anak 1,041,747 700,746 Subsidiaries

3,688,449 1,326,700

Beban pajak tangguhan Deferred tax expense


Perusahaan 792,009 2,141,970 The Company
Entitas anak 2,621,475 1,063,664 Subsidiaries

3,413,484 3,205,634

Jumlah beban pajak 7,101,933 4,532,334 Total income tax expense

a. Pajak kini a. Current tax

Rekonsiliasi antara laba sebelum pajak The reconciliation between the consolidated profit
penghasilan konsolidasian dengan estimasi before income tax and the estimated taxable
penghasilan kena pajak adalah sebagai berikut: income is as follows:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)
Laba sebelum pajak Profit before tax per
menurut laporan laba rugi consolidated statements of profit or loss
komprehensif konsolidasian 33,018,770 21,912,425 and other comprehensive income
Laba sebelum pajak Profit before tax attributable
entitas anak (19,254,730) (11,301,925) to subsidiaries
Disesuaikan dengan jurnal Adjustment for consolidation
eliminasi konsolidasian - - elimination entries

Laba sebelum pajak - Profit before tax -


Perusahaan 13,764,040 10,610,500 the Company
Koreksi fiskal: Fiscal correction:
Beban sewa (1,321,957) (1,366,127) Lease expenses
Penyambungan pelanggan 4,015,063 3,390,927 Customer connection fees
Depreciation of property, plant
Penyusutan aset tetap (8,149,063) (12,223,738) and equipment
Imbalan kerja 771,829 743,887 Employee benefits
Penyusutan biaya dikapitalisasi (777,019) (574,025) Depreciation of capitalised expense
Biaya/(pendapatan) yang
tidak dapat diperhitungkan Non-deductible expenses/
menurut fiskal: (non-taxable income):
Kesejahteraan karyawan 547,429 438,802 Employee welfare
Penyisihan kerugian kredit Allowance for expected credit losses
ekspektasian piutang dan of receivables and allowance for
penurunan nilai persediaan decline in value of inventories
dan persediaan usang 218,155 131,846 and inventory obsolescence
Penyusutan rumah dinas - (9,539) Depreciation of guest house
Penghasilan bunga telah Interest income
dikenakan pajak final (352,180) (116,659) subjected to final tax
Beban lain tidak dapat
dikurangkan 3,314,166 1,819,371 Other non-deductible expenses

Estimasi laba fiskal kena pajak The Company's taxable


Perusahaan periode berjalan 12,030,463 2,845,245 income for the period

Beban pajak kini - Perusahaan 2,646,702 625,954 Current tax - the Company

Beban pajak pini – Entitas Anak 104,1747 700,746 Current tax - the Subsidiaries

Total beban pajak 3,688,449 1,326,700 Total income tax expenses


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/132 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan) 47. INCOME TAX (continued)

a. Pajak kini (lanjutan) a. Current tax (continued)

2023 2022
(Enam Bulan/ (Enam Bulan/
Si x M onths) Si x M onths)
Beban pajak kini Current tax expense
Perusahaan (2,646,702) (625,954) The Company
Entitas anak (1,041,747) (700,746) Sub sidiaries

Jumlah (3,688,449) (1,326,700) Total

Pembayaran pajak dimuka Prepayment of taxes


Perusahaan The Company
Pajak penghasilan Income tax
Pasal 22 226,688 2,022 Article 22
Pasal 23 34,141 64,304 Article 23
Pasal 25 44,324 - Article 25
Jumlah 305,153 66,326 Total

Le bih bayar pajak Kini Ta x overpa yment


Perusahaan 260,829 71,926 The Company
Entitas anak 429,364 416,964 Sub sidiries
Jumlah pajak penghasilan Tota l overpa yment of corpora te
badan lebih bayar (Catatan 19) 690,193 488,890 income tax (Note 19)

Kurang bayar pajak Kini Ta x overpa yment


Perusahaan 2,646,768 626,115 The Company
Jumlah pajak penghasilan Tota l underpa yment of corpora te
badan kurang bayar 2,646,768 626,115 income tax (Note 19)

Laba kena pajak hasil rekonsiliasi menjadi The taxable income resulting from the
dasar dalam pengisian Surat Pemberitahuan reconciliation will become the basis for filing the
Tahunan PPh Badan. Annual CIT Return.

b. Pajak tangguhan b. Deferred tax

Rincian dari aset dan liabilitas pajak tangguhan The details of the Group deferred tax assets and
Grup adalah sebagai berikut: liabilities are as follows:
30 Juni/ June 30, 2023
Dikreditkan
Dikreditkan (dibebankan)
(dibebankan) ke pendapatan
ke laporan komprehensif lain/
Laba rugi/ Credited (charged)
Saldo awal/ Credited to other Saldo akhir/
Beginning (charged) to comprehensive Ending
balance income income balance

Aset Pajak tangguhan Deferred tax assets


Akumulasi rugi fiskal 1,709 (1,709) - - Accumulated fiscal losses
Liabilitas imbalan kerja 107,177 (19,435) (676) 87,066 Employee benefit liabilities
Sewa 6,446 (5,832) - 614 Finance leases
Aset tetap 124,192 (4,937) - 119,255 Property, plant and equipment
Bonus 57,293 (57,293) - - Bonus
Penyisihan persediaan 29,064 (1,076) - 27,988 Provision inventories
Penyisihan piutang usaha 91,958 (48,440) - 43,518 Provision Account receivable
Laba dari entitas asosiasi (3) - - (3) Income form associates
Lainnya 9,611 42,370 - 51,981 Others
Jumlah 427,447 (96,352) (676) 330,419 Total

Liabilitas pajak tangguhan Deferred tax liabilities


Liabilitas imbalan kerja 15,042,759 176,451 19,943 15,239,153 Employee benefit liabilities
Pendapatan ditangguhkan 4,646,551 892,217 - 5,538,768 Deferred revenue
Sewa pembiayaan (3,333,850) (39,656) - (3,373,506) Finance leases
Aset tetap (64,983,654) (4,029,052) 18,474 (68,994,232) Property, plant and equipment
Bonus 178,157 (66,347) - 111,810 Bonus
Provision inventories 35,956 44,192 - 80,148 Provision Inventories
Provision Account receivable 1,901 3,547 - 5,448 Provision Account receivable
Lainnya (15,283) (298,484) - (313,767) Others
Jumlah (48,427,463) (3,317,132) 38,417 (51,706,178) Total

(3,413,484) 37,741 (51,375,759)


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/133 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan) 47. INCOME TAX (continued)

b. Pajak tangguhan (lanjutan) b. Differed tax (continued)

31 Desember/ December 31, 2022


Dibebankan
Dikreditkan/ ke penghasilan
(dibebankan) komprehensif
ke laporan lain/
laba rugi/ Charged
Saldo awal/ Credited/ to other Saldo akhir/
Beginning (charged) to comprehensive Ending
balance profit or loss income balance

Aset pajak tangguhan Deferred tax assets


Akumulasi rugi fiskal 1,019 690 - 1,709 Accumulated tax losses
Liabilitas imbalan kerja 95,679 1,845 9,654 107,178 Employee benefit liabilities
Sewa pembiayaan 7,002 (556) - 6,446 Finance leases
Aset tetap 17,534 106,658 - 124,192 Property, plant and equipment
Penyisihan penurunan Provision for impairment
nilai piutang 77,400 14,559 - 91,959 losses of receivables
Penyisihan persediaan 1,120 27,944 - 29,064 Provision for inventories
Bonus 45,489 11,804 - 57,293 Bonuses
Bagian laba bersih dari Share net income
entitas asosiasi dan from associates and
ventura bersama (3) - - (3) joint ventures
Lainnya 19,465 (9,855) 9,610 Others

Jumlah 264,705 153,089 9,654 427,448 Total

Liabilitas pajak tangguhan Deferred tax liabilities


Liabilitas imbalan kerja 11,289,736 305,760 3,447,210 15,042,706 Employee benefit liabilities
Pendapatan ditangguhkan 3,057,426 1,589,125 - 4,646,551 Deferred revenue
Sewa pembiayaan (3,199,419) (134,432) - (3,333,851) Finance leases
Aset tetap (56,967,171) (7,925,748) (90,720) (64,983,639) Property, plant and equipment
Bonus 196,857 (18,701) - 178,156 Bonuses
Penyisihan persediaan 34,307 1,649 - 35,956 Provision for inventories
Penyisihan penurunan Provision for impairment
nilai piutang 41,218 (39,316) - 1,902 losses of receivables
Lainnya (29,329) 14,087 - (15,242) Others

Jumlah (45,576,375) (6,207,576) 3,356,490 (48,427,461) Total

(6,054,487) 3,366,144 (48,000,013)

Pajak atas laba sebelum pajak konsolidasian The tax on the consolidated profit before income
berbeda dengan jumlah teoritis yang dihitung tax differs from the theoretical amount that would
menggunakan rata-rata tertimbang tarif pajak arise using the weighted average tax rate
yang berlaku atas laba/(rugi) masing-masing applicable of profit/(loss) of the consolidated
entitas anak yang dikonsolidasi sebagai berikut: subsidiaries as follows:
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/134 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan) 47. INCOME TAX (continued)

b. Pajak tangguhan (lanjutan) b. Deferred tax (continued)

Pajak atas laba sebelum pajak konsolidasian The tax on the consolidated profit before income
berbeda dengan jumlah teoritis yang dihitung tax differs from the theoretical amount that would
menggunakan rata-rata tertimbang tarif pajak arise using the weighted average tax rate
yang berlaku atas laba/(rugi) masing-masing applicable of profit/(loss) of the consolidated
entitas anak yang dikonsolidasi sebagai berikut: subsidiaries as follows:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Laba sebelum pajak


penghasilan menurut Profit before income tax per
laporan laba rugi dan consolidated statements of
komprehensif konsolidasian 33,018,769 21,912,425 comprehensive income

Beban pajak sesuai tarif pajak Tax expense at


yang berlaku yaitu 22% 7,264,129 4,820,734 prevailing tax rate of 22%

Pengaruh pajak atas: Tax effect of:


Biaya yang tidak dapat
dikurangkan
menurut pajak Non-deductible expenses
Kesejahteraan karyawan 207,191 258,369 Employee welfare
Bagian atas laba bersih Share in net income of
entitas asosiasi dan associates and
ventura bersama (728,864) (1,044,103) joint ventures
Penghasilan bunga dikenakan Interest income subject to
pajak final (77,576) (37,574) final tax
Bunga obligasi internasional 87,922 211,338 International bond obligation
Beban lain tidak dapat
dikurangkan 3491,31 323,570 Other non-deductible expenses
Perubahan tarif pajak - - Tax rate adjustment

Jumlah 7,101,933 4,532,334 Total

c. Surat ketetapan pajak c. Tax assessment letters

Jumlah yang Jumlah yang


diperkarakan diperkarakan
Tahun dalam Rupiah/ dalam Rupiah/
pajak/ Dispute Dispute
Fiscal Surat ketetapan pajak/ amount in IDR amount in IDR
Jenis pajak/Tax type Year Tax assessment letter 2023 2022 Status/Status

PLN
PPN Pemungut/VAT collector 2016 Kurang bayar/Underpayment 75,325 75,325 Putusan diterima,
permohonan
pengembalian ke DJP/
Verdict accepted, request
of refund to DJP
PPh pasal 21/Income tax art 21 2017 Kurang bayar/Underpayment 35,522 35,522 Banding/Appeal
PPh pasal 22/Income tax art 22 2017 Kurang bayar/Underpayment 364,684 364,684 Peninjauan
kembali/Judicial review
PPh pasal 23/Income tax art 23 2017 Kurang bayar/Underpayment 49,274 49,274 Peninjauan kembali/
Judicial review
PPh pasal 4 ayat (2)/ 2017 Kurang bayar/Underpayment 198,992 1,219,431 Peninjauan kembali//
Income tax art 4(2) Judicial review
PPN dalam negeri/Domestic VAT 2017 Kurang bayar/Underpayment 278,105 278,105 Banding/Appeal
PPN pemungut/VAT collector 2017 Kurang bayar/Underpayment 304,029 304,029 Peninjauan kembali/
Judicial review
STP PPN dalam negeri/ 2017 Kurang bayar/Underpayment 219,486 219,486 Menunggu hasil banding
Tax assessment letter domestic PPN DN 2017/Waiting for
VAT appeal PPN DN 2017
PPN pemungut/VAT collector 2018 Kurang bayar/Underpayment 310,037 310,037 Peninjauan
kembali/Judicial review
PPh pasal 21/Income tax art 21 2018 Kurang bayar/Underpayment 336,283 336,283 Banding/Appeal
PPh pasal 22/Income tax art 22 2018 Kurang bayar/Underpayment 176,068 176,068 Banding/Appeal
PPh pasal 23/Income tax art 23 2018 Kurang bayar/Underpayment 2,380,167 2,380,167 Banding/Appeal
PPh pasal 4 ayat (2)/ 2018 Kurang bayar/Underpayment 2,950,558 2,950,558 Banding/Appeal
Income tax art 4(2)
Bea meterai/Stamp duty 2018 Kurang bayar/Underpayment 199,341 199,341 Banding/Appeal
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/135 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan) 47. INCOME TAX (continued)

c. Surat ketetapan pajak (lanjutan) c. Tax assessment letters (continued)

Jumlah yang Jumlah yang


diperkarakan diperkarakan
Tahun dalam Rupiah/ dalam Rupiah/
pajak/ Dispute Dispute
Fiscal Surat ketetapan pajak/ amount in IDR amount in IDR
Jenis pajak/Tax type Year Tax assessment letter 2023 2022 Status/Status

PLN (lanjutan/continued)
PPh pasal 21/Income tax art 21 2019 Kurang bayar/Underpayment 114,695 114,695 Banding/Appeal
PPh pasal 22/Income tax art 22 2019 Kurang bayar/Underpayment 499,208 499,208 Banding/Appeal
PPh pasal 4 ayat (2)/ 2019 Kurang bayar/Underpayment 532,139 532,139 Banding/Appeal
Income tax art 4(2)
PPh pasal 26/Income tax art 26 2019 Kurang bayar/Underpayment 215,145 215,145 Banding/Appeal
Bea meterai/Stamp Duty 2019 Kurang bayar/Underpayment 188,692 188,692 Banding/Appeal
PPh Badan/Corporate income tax 2019 Kurang bayar/Underpayment 3,061,305 3,061,305 Banding/Appeal
PPN pemungut/VAT collector 2019 Kurang bayar/Underpayment 878,959 878,959 Banding/Appeal

PJB
PPh pasal 22/Income tax art 22 2017 Kurang bayar/Underpayment - 7,768 Peninjauan
kembali/Judicial review
PPh pasal 22/Income tax art 22 2018 Kurang bayar/Underpayment 162,946 162,946 Banding/Appeal
PPh pasal 22/Income tax art 22 2019 Kurang bayar/Underpayment 136,172 136,172 Banding/Appeal

IP
PPh Badan/Corporate income tax 2016 Kurang bayar/Underpayment 16,094 16,094 Keberatan/Objection
PPh pasal 22/Income tax art 22 2016 Kurang bayar/Underpayment 161,344 161,344 Banding/Appeal
PPh pasal 22/Income tax art 22 2016 Kurang bayar/Underpayment 75,775 75,775 Banding/Appeal
PPh pasal 22/Income tax art 22 2017 Kurang bayar/Underpayment 46,372 46,372 Banding/Appeal
PPh pasal 23/Income tax art 23 2018 Kurang bayar/Underpayment 19,925 19,925 Banding/Appeal
PPh pasal 4 ayat (2)/ 2018 Kurang bayar/Underpayment 136,071 136,071 Banding/Appeal
Income tax art 4(2)
PPh pasal 22/Income tax art 22 2019 Kurang bayar/Underpayment 108,289 108,289 Banding/Appeal
PPh pasal 22/Income tax art 22 2020 Kurang bayar/Underpayment 50,404 50,404 Keberatan/Objection
PPh pasal 22/Income tax art 22 2021 Kurang bayar/Underpayment 50,122 - Banding/Appeal
PPh pasal 22/Income tax art 22 2021 Kurang bayar/Underpayment 10 - Banding/Appeal

Majapahit Holding B.V.


PPh Badan/Corporate income tax 2017 Kurang bayar/Underpayment 369,567 384,152 Pengajuan keberatan/
Submission of objection
Haleyora Power
PPh Badan/Corporate income tax 2016 Kurang bayar/Underpayment 12,680 - Banding/Appeal
PPh Badan/Corporate income tax 2017 Kurang bayar/Underpayment 12,655 - Keberatan/Objection
PPh 23/Income Tax Art 23 2017 Kurang bayar/Underpayment 122 Keberatan/Objection
PPN/VAT 2017 Kurang bayar/Underpayment 4,891 - Keberatan/Objection
PPN/VAT 2019 Kurang bayar/Underpayment 10133 - Keberatan/Objection
PPh 25/Income Tax Art 25 2022 Lebih bayar/Overpayment 9.585 - Pemeriksaan/Inspection
PPh 25/Income Tax Art 25 2021 Lebih bayar/Overpayment 5,845 - Pemeriksaan/Inspection
EPI
PPh Badan/Corporate income tax 2021 Kurang bayar/Underpayment 169,475 - Banding/Appeal

Jumlah/Total 14,926,492 15,693,765

Provisi/Provision (5,945,235) (4,434,631)

Jumlah, bersih/Total, net 8,981,257 11,259,134


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/136 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan) 47. INCOME TAX (continued)


c. Surat ketetapan pajak (lanjutan) c. Tax assessment letters (continued)

Pada tanggal 25 Juli 2022, Perusahaan telah On July 25, 2022, the Company has received
menerima Surat Keputusan Direktur Jenderal the Decree of the Director General of Taxes No
Pajak No PUT-004028.25/2020/PP/M.XIIA PUT-004028.25/2020/PP/M.XIIA concerning the
tentang Keputusan SKPKB PPh Pasal 4(2) decision on SKPKB Income Tax Article 4(2) with
dengan keputusan pengembalian pajak melalui the decision of tax refund through compensating
kompensasi SPMKP sebesar Rp238.979 dan the SPMKP amounted to Rp238,979 and cash
penerimaan kas sebesar Rp781.461 untuk receipts amounted to Rp781,461 for the fiscal
masa pajak Juni 2017. Pada tanggal 16 period June 2017. On November 16, 2022, DGT
November 2022, DJP telah mengajukan submitted the judicial review regarding the
Peninjauan Kembali atas Putusan Banding. appeal decision. Regarding the decision issued
Sehubungan dengan keputusan yang on July 25, 2022, DGT issued Decree No. KEP-
dikeluarkan pada tanggal 25 Juli 2022, DJP 00001/PPH/KPP.1903/2023 dated January 6,
menerbitkan Surat Keputusan No. KEP- 2023 for correcting the fiscal period from June
00001/PPH/KPP.1903/2023 tanggal 6 Januari 2017 to December 2017. Up to the completion
2023 untuk mengoreksi masa pajak dari Juni date of these consolidated financial statements,
2017 menjadi Desember 2017. Sampai dengan the tax case is still in the process of being
tanggal penyelesaian laporan keuangan examined in the Supreme Court.
konsolidasian ini, kasus perpajakan masih
dalam proses pemeriksaan di Mahkamah
Agung.

Selama periode enam bulan yang berakhir During the six-month periods ended June 30,
tanggal 30 Juni 2023, Perusahaan telah 2023, the Company received tax refunds from
menerima pengembalian pajak dari hasil the proceeds of the objections and appeals for
keberatan dan banding untuk tahun fiskal 2017 fiscal years 2017 on Income Tax Article 4(2)
atas PPh Pasal 4 ayat (2) sebesar amounted to Rp1,020,440, through cash
Rp1.020.440, melalui penerimaan kas sebesar receipts of Rp781,461 and through deduction of
Rp781.461 dan melalui pemotongan utang the tax payable of Rp238,979.
pajak sebesar Rp238.979.

Pada tanggal 16 Juni 2023, Perusahaan telah On June 16, 2023, the Company has received
menerima Surat Keputusan Direktur Jenderal the Decree of the Director General of Taxes No.
Pajak No. KEP-00527/NKEB/PJ/WPJ.19/2023 KEP-00527/NKEB/PJ/WPJ.19/2023 regarding
tentang pengurangan ketetapan pajak atas the deduction of tax assessment on tax
Surat Tagihan Pajak (STP) Pajak Pertambahan assessment letter regarding value added tax
Nilai barang dan jasa berdasarkan pasal 36 goods and services based on article 36 (1) letter
ayat (1) huruf C secara jabatan sebesar C on a position amounted Rp178,103.
Rp178.103.

Manajemen berkeyakinan bahwa provisi atas Management believes that provision against
ketidakpastian posisi pajak telah mencukupi. uncertain tax positions is adequate.

d. Tarif pajak d. Tax rates

Pada tanggal 29 Oktober 2021, Presiden On October 29, 2021, the President of the
Republik Indonesia telah mengesahkan Republic Indonesia has ratified the Law No. 7
Rancangan Undang-Undang No. 7 tahun 2021 Year 2021 as Harmonisation of Tax Regulations
tentang Harmonisasi Peraturan Perpajakan (the “HPP Law”). The HPP Law stipulates that
(“UU HPP”). UU HPP menetapkan tarif PPh the CIT rate for Corporate Tax Payers and
bagi Wajib Pajak Badan dan Bentuk Usaha Permanent Establishments remains at 22%.
Tetap sebesar 22%.
e. Administrasi e. Administration

Berdasarkan undang-undang perpajakan yang Based on the taxation laws in Indonesia,


berlaku di Indonesia, Perusahaan di dalam companies within the Group which are domiciled
Grup yang berdomisili di Indonesia menghitung in Indonesia calculate and pay tax on the basis
dan membayar sendiri besarnya jumlah pajak of self-assessment. The DJP may assess or
yang terutang. DJP dapat menetapkan atau amend taxes within five years of the time the tax
mengubah pajak dalam batas waktu lima tahun becomes due.
saat terutangnya pajak.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/137 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

48. LABA PER SAHAM DASAR DAN DILUSIAN 48. BASIC AND DILUTED EARNINGS PER SHARE

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months)

Laba konsolidasian tahun berjalan


yang dapat diatribusikan kepada Consolidated profit for the year
pemilik entitas induk 25,895,393 17,346,476 attributable to the owners
Rata-rata tertimbang jumlah Weighted average number of
saham biasa yang beredar ordinary shares outstanding
(dalam ribuan lembar saham) 143,551 139,214 (in thousand of shares)

Laba bersih per saham dasar Basic earnings per share


yang dapat diatribusikan attributable to the owners
kepada pemilik entitas induk of the parent entity
(dalam Rupiah penuh) 180,391 124,602 (in Rupiah full amount)

Perusahaan tidak mempunyai efek berpotensi dilusi The Company did not have potential dilutive ordinary
saham, sehingga laba per saham dasar sama shares, therefore basic earnings per share is the
dengan laba per saham dilusian. same as the dilutive earnings per share.

49. LIABILITAS IMBALAN KERJA 49. EMPLOYEE BENEFITS LIABILITIES

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Liabilitas imbalan kerja jangka pendek Short-term employee benefit liabilities

Bonus dan insentif prestasi kerja 2,605,821 5,444,480 Bonus and performance incentives
Liabilitas pascakerja Post-employment benefits liability-
jangka pendek 3,939,968 3,866,636 current portion

Jumlah 6,545,789 9,311,116 Total

Liabilitas imbalan kerja jangka panjang Long-term employee benefit liabilities

Imbalan pascakerja Post-employment benefits


Program pensiun (263,033) 445,303 Pension program
Imbalan pascakerja lainnya 1,465,233 14,032,285 Other post-employment benefits
Imbalan pemeliharaan kesehatan 55,030,510 53,702,837 Health care benefits
Imbalan jangka panjang lainnya 681,937 724,791 Other long-term benefits

Jumlah 70,104,647 68,905,216 Total

Dikurangi: bagian jangka pendek 3,939,968 3,866,636 Less: current portion

Bagian jangka panjang 66,164,679 65,038,580 Long-term portion

Beban diakui di laba rugi Expense recognised in profit


(Catatan 43): or loss (Note 43):
Imbalan pascakerja Post-employment benefits
Program pensiun manfaat pasti 46058 75,876 Defined benefit pension program
Imbalan pascakerja lainnya 1,005,199 2,065,749 Other post-employment benefits
Imbalan pemeliharaan kesehatan 2,336,297 3,406,338 Health care benefits
Imbalan jangka panjang lainnya 117,251 (434,433) Other long-term benefits

Jumlah 3,504,805 5,113,530 Total

Pengukuran kembali program Remeasurement on defined benefit


manfaat pasti diakui di plan recognised in other
penghasilan komprehensif lain: comprehensive income:
Imbalan pascakerja Post-employment benefits
Program pensiun manfaat pasti 149,982 23,217 Defined benefit pension program
Imbalan pascakerja lainnya 6,432 (593,930) Other post-employment benefits
Imbalan pemeliharaan kesehatan (68,840) 16,283,893 Health care benefits

Jumlah 87,574 15,713,180 Total


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/138 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan) 49. EMPLOYEE BENEFITS LIABILITIES (continued)

Kenaikan signifikan pada pengukuran kembali The significant increase in remeasurement on


program manfaat pasti yang diakui di penghasilan defined benefit plan which recognised in other
komprehensif lain sebagian besar disebabkan comprehensive income is mainly due to changes in
karena perubahan asumsi demografis. the demographic assumptions.

Program pensiun manfaat pasti Defined benefit pension program

Grup menyelenggarakan program pensiun manfaat The Group established a defined benefit pension
pasti untuk semua karyawan tetap yang memenuhi program covering all of its eligible permanent
syarat. Program pensiun ini memberikan imbalan employees. This pension plan provides benefits based
berdasarkan penghasilan dasar pensiun dan masa on basic pension income and the period of
kerja karyawan. employment.

Program pensiun ini dikelola oleh Dana Pensiun This pension plan is managed by Dana Pensiun PLN
PLN (”DP-PLN”), pihak berelasi, yang akta (“DP-PLN”), a related party, whose deed of
pendiriannya telah disahkan oleh Kementerian establishment was approved by the Ministry of
Keuangan Republik Indonesia dengan Surat Finance of the Republic of Indonesia in its Decision
Keputusannya No. KEP-284/KM.17/1997 tanggal 15 Letter No. KEP-284/KM.17/1997 dated May 15, 1997.
Mei 1997.

Pendanaan DP-PLN terutama berasal dari iuran DP-PLN is mainly funded by contributions from both
karyawan dan pemberi kerja masing-masing the employees and the employer which are 6.00% and
sebesar 6,00% dan 18,94% dari penghasilan dasar 18.94% from basic pension income, respectively.
pensiun

Pada tanggal 4 April 2022, DSAK-IAI menerbitkan On April 4, 2022, the DSAK-IAI published a press
siaran pers mengenai “Pengatribusian Imbalan pada release regarding “Attributing benefit to Periods of
Periode Jasa (PSAK No. 24)” sebagai tanggapan Service (SFAS No. 24)” in response to the
atas Standar Akuntansi Keuangan Internasional, International Financial Accounting Standards,
Keputusan Agenda Komite Interpretasi: Standar: Interpretation Committee Agenda Decision:
Akuntansi Internasional 19 Imbalan Kerja - International Accounting Standard 19 Employee
Pengatribusian Imbalan pada Periode Jasa, yang Benefits - Attributing Benefit to Periods of Service,
diterbitkan pada Mei 2021. Per 30 Juni 2023 dan 31 published in May 2021. As at June 30, 2023 and
Desember 2022, dampak dari perubahan December 31, 2022, the impact of the changes in the
perhitungan tidak material bagi Grup, oleh karena calculation is immaterial to the Group, therefore, the
itu, dampak perubahan tersebut dicatat seluruhnya impact of the changes is recorded fully in the
dalam laporan keuangan konsolidasian tahun consolidated financial statements for the current year.
berjalan.

Imbalan pemeliharaan kesehatan Health care benefits

Selain program pensiun yang dikelola oleh DP-PLN, In addition to the pension plan managed by DP-PLN,
Grup menyediakan imbalan program kesehatan the Group also provides unfunded health care benefit
tanpa pendanaan bagi pensiunan dan plans for pensioners and their eligible dependents.
tanggungannya yang memenuhi persyaratan.

Imbalan pascakerja lainnya Other post-employment benefits

Selain dari program dana pensiun dan imbalan In addition to the pension plan and health care
pemeliharaan kesehatan, Grup menyediakan benefits, the Group also provides unfunded severance
imbalan pesangon dan penghargaan purna jabatan benefits and completion of employment awards for
tanpa pendanaan bagi pegawai yang memenuhi eligible employees.
syarat.

Imbalan jangka panjang lainnya Other long-term benefits

Grup juga memberikan imbalan kerja jangka The Group also provides other long-term employee
panjang lainnya seperti uang cuti besar, tunjangan benefits such as long leave allowance, disability
kecelakaan dinas, bantuan kematian dan benefit, death benefit and loyalty benefits.
penghargaan kesetiaan kerja.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/139 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan) 49. EMPLOYEE BENEFITS LIABILITIES (continued)

Asumsi-asumsi utama yang digunakan dalam The principal assumptions used in the calculations of
perhitungan liabilitas imbalan kerja post employment benefits obligation

Tabel mortalita CSO-58 Mortality table


Usia pensiun normal 56 tahun/years Normal retirement age

Asumsi yang berhubungan dengan pengalaman Assumptions regarding future mortality experience are
mortalitas masa depan ditentukan berdasarkan set based on actuarial advice in accordance with
saran aktuaris menurut statistik yang telah published statistics and experience by the Company
diterbitkan dan pengalaman setiap wilayah. Asumsi and its subsidiaries. The mortality assumptions used
mortalitas yang digunakan adalah tabel mortalita are based on the CSO-58 mortality table which is
CSO-58 yang diterapkan dalam penghitungan applied in calculating the long-term benefits liability
liabilitas kerja jangka panjang yang diakui dalam recognised within the consolidated statements of
laporan posisi keuangan konsolidasian. financial position.

Perhitungan aktuaria atas program pensiun, imbalan The actuarial calculations of the pension program,
pascakerja lainnya, imbalan pemeliharaan other post-employment benefits, health care benefits
kesehatan dan imbalan kerja jangka panjang lainnya and other long-term benefits for the years ended
untuk tahun yang berakhir pada tanggal 31 December 31, 2022 were calculated by a registered
Desember 2022, dihitung oleh Kantor Konsultan Actuarial Consulting Firm (“KKA”), KKA Tubagus
Aktuaria (“KKA”) yang terdaftar yaitu KKA Tubagus Syafrial & Amran Nangasan (formerly PT Binaputera
Syafrial & Amran Nangasan (sebelumnya PT Jaga Hikmah), based on its reports dated April 17,
Binaputera Jaga Hikmah) dalam laporannya masing- 2023 and April 26, 2022, respectively.
masing tertanggal 17 April 2023 dan 26 April 2022.

Grup melakukan studi pada tahun 2020 untuk The Group conducted a study in 2020 to determine
melihat tabel mortalitas mana yang paling sesuai which mortality tables best suited most of the Group’s
dengan profil mortalitas pegawai dan pensiunan employees’ and pensioners’ mortality profiles. In the
Grup. Dalam melakukan studi, Grup telah study, the Group considered CSO-58, GAM-71, ANN-
mempertimbangkan CSO-58, GAM-71, ANN-49, 49, GAM-83, TMI-2011, and TMI-2019. Based on the
GAM-83, TMI-2011, TMI-2019. Dari studi tersebut, study, the Group found that the mortality table that
Grup menemukan bahwa tabel mortalitas yang best suited the mortality profile of the Group’s
paling sesuai dengan profil mortalitas pegawai dan employees and pensioners is CSO-58.
pensiunan Grup adalah CSO-58.

i. Program pensiun i. Pension program

Jumlah liabilitas yang diakui pada laporan posisi The liability recognised in the consolidated
keuangan konsolidasian ditentukan sebagai statements of financial position is determined as
berikut: follows:

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Nilai kini kewajiban yang didanai 10,415,399 10,336,245 Present value of funded obligations
Nilai wajar aset program (10,678,432) (9,890,942) Fair value of plan assets

Liability in the
Liabilitas pada laporan consolidated statement of
posisi keuangan konsolidasian (263,035) 445,303 financial position
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/140 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan) 49. EMPLOYEE BENEFITS LIABILITIES (continued)

i. Program pensiun (lanjutan) i. Pension program (continued)

Pergerakan kewajiban program pensiun The movement in the defined benefit pension
manfaat pasti selama tahun berjalan adalah program obligation over the year is as follows:
sebagai berikut:
30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Saldo awal 10,336,245 10,463,943 Beginning balance


Dibebankan ke laba rugi: Charged to profit or loss:
Biaya jasa kini 60,333 69,177 Current service cost
Biaya bunga 349,118 665,556 Interest expense

409,451 734,733
Pengukuran kembali: Remeasurements:
(Keuntungan)/kerugian aktuarial
yang timbul dari (Gain)/loss from change in
perubahan asumsi keuangan 675 (48,017) financial assumptions
Kerugian aktuarial
dari perubahan Actuarial loss from various of
beberapa asumsi - 501 changes in assumptions
Kerugian dari penyesuaian
atas pengalaman 149,307 100,466
Experience loss
Kerugian yang timbul dari Loss from change in
perubahan asumsi demografis - 6,254 demographic assumptions

149,982 59,204

Pembayaran manfaat (480,280) (921,635) Benefit payments

Saldo akhir 10,415,398 10,336,245 Ending balance

Mutasi nilai wajar aset program selama tahun The movement in the fair value of plan assets
berjalan adalah sebagai berikut: over the year is as follows:

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022
Saldo awal 9,890,942 9,217,554 Beginning balance
Imbal hasil atas aset program 344,661 617,450 Return on plan assets
Iuran pemberi kerja 904,377 900,179 Employer’s contributions
Iuran pekerja 18,732 41,407 Employee contributions
Pembayaran manfaat (480,280) (921,635) Benefit payments
Kerugian aktuarial Actuarial loss
pada aset program - 35,987 on plan assets

Saldo akhir 10,678,432 9,890,942 Ending balance

Asumsi aktuarial utama yang digunakan adalah The principal actuarial assumptions used were as
sebagai berikut: follows:
2023 2022

Tingkat diskonto 7.07% - 7.42% 7.07% - 7.42% Discount rate


Tingkat kenaikan manfaat pensiun 5.00% 5.00% Pension benefit increase rate

Sensitivitas dari kewajiban manfaat pasti The sensitivity of the defined benefit obligation to
terhadap perubahan asumsi aktuarial utama changes in the weighted principal assumptions is
adalah sebagai berikut: as follows:

Dampak atas kewajiban manfaat pasti/


Impact on defined benefit obligation
Perubahan Kenaikan Penurunan
asumsi/ asumsi/ asumsi/
Change in Increase in Decrease in
assumption assumption assumption

Tingkat diskonto 1% 157,159 (177,525) Discount rate


Tingkat kenaikan gaji 1% (179,389) 160,947 Salary growth rate
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/141 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan) 49. EMPLOYEE BENEFITS LIABILITIES (continued)

ii. Imbalan pascakerja lainnya ii. Other post-employment benefits

Pergerakan kewajiban imbalan pascakerja The movement in the other post-employment


lainnya selama tahun berjalan adalah sebagai benefits obligation over the year is as follows:
berikut:

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Saldo awal 14,032,285 13,422,644 Beginning balance

Dibebankan ke laba rugi: Charged to profit or loss:


Biaya jasa kini 506,589 1,066,392 Current service cost
Biaya bunga 502,225 986,571 Interest expense
Biaya jasa lalu - 23,760 Past service cost
Imbal hasil atas aset program (3,615) (10,974) Return on plan assets

1,005,199 2,065,749

Pengukuran kembali: Remeasurements:


Keuntungan dari
penyesuaian atas pengalaman 3,337 (561,461) Experience gains
(Keuntungan)/kerugian aktuarial
yang timbul dari (Gain)/loss from change in
perubahan asumsi keuangan 3,095 (65,903) financial assumptions
Kerugian/(keuntungan) aktuarial
yang timbul dari kombinasi Loss/(gain) from combination of
perubahan asumsi - 8,680 changes in assumptions
Kerugian/(keuntungan) yang timbul dari Loss/(gain) from change in
perubahan asumsi demografis - 24,754 demographic assumptions

6,432 (593,930)

Pembayaran manfaat (388,683) (862,178) Benefit payments


Liabilitas yang diambil alih melalui Liabilities assumed in
kombinasi bisnis - - business combination

Saldo akhir 14,655,233 14,032,285 Ending balance

Asumsi aktuarial utama yang digunakan adalah The principal actuarial assumptions used were as
sebagai berikut: follows:

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Tingkat diskonto 6.87% - 7.44% 6.87% - 7.44% Discount rate


Tingkat kenaikan gaji per tahun 5.00% - 7.12% 5.00% - 7.12% Rate of salary increase per annum

Sensitivitas dari imbalan pascakerja lainnya The sensitivity of the other post-employment
terhadap perubahan asumsi aktuarial utama benefits to changes in the weighted principal
adalah sebagai berikut: assumptions is as follows:

Dampak atas imbalan pascakerja lainnya/


Impact on other post-employment benefits
Perubahan Kenaikan Penurunan
asumsi/ asumsi/ asumsi/
Change in Increase in Decrease in
assumption assumption assumption

Tingkat diskonto 1% 1,506,120 (1,811,444) Discount rate


Tingkat kenaikan gaji 1% (1,848,642) 1,565,232 Salary growth rate
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/142 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan) 49. EMPLOYEE BENEFITS LIABILITIES (continued)

iii. Imbalan pemeliharaan kesehatan iii. Health care benefit

Grup memiliki beberapa skema imbalan The Group operates a number of post-
pemeliharaan kesehatan pascakerja. Metode employment health care benefit schemes. The
akuntansi, asumsi dan frekuensi penilaian method of accounting, assumptions and the
adalah sama dengan yang digunakan dalam frequency of valuations are similar to those used
skema pensiun manfaat pasti. for defined benefit pension schemes.

Pergerakan kewajiban imbalan pemeliharaan The movement in the health care benefits
kesehatan selama tahun berjalan adalah obligation over the year is as follows:
sebagai berikut:

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Saldo awal 53,702,837 35,481,478 Beginning balance

Dibebankan ke laba rugi: Charged to profit or loss:


Biaya jasa kini 396,404 826,116 Current service cost
Biaya bunga 1,939,893 2,580,222 Interest expense

2,336,297 3,406,338

Pengukuran kembali: Remeasurements:


Kerugian/(keuntungan) aktuarial
yang timbul dari perubahan Loss/(gain) from change in
asumsi keuangan 4,533 20,227 financial assumptions
Kerugian/(keuntungan) dari
penyesuaian atas pengalaman (73,373) 3,272,494 Experience losses/(gains)
(Keuntungan)/kerugian aktuarial
yang timbul dari kombinasi (Gain)/loss from combination of
perubahan asumsi - (114,844) changes in assumptions
Kerugian yang timbul dari Loss from change in
perubahan asumsi demografis - 13,106,016 demographic assumptions

(68,840) 16,283,893

Pembayaran manfaat (939,784) (1,468,872) Benefit payments

Saldo akhir 55,030,510 53,702,837 Ending balance

Asumsi aktuarial utama yang digunakan adalah The principal actuarial assumptions used were as
sebagai berikut: follows:

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Tingkat diskonto 7.32% - 7.60% 7.32% - 7.60% Discount rate


Tingkat kenaikan biaya kesehatan 5.35% 5.35% Future health cost increase
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/143 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan) 49. EMPLOYEE BENEFITS LIABILITIES (continued)

iii. Imbalan pemeliharaan kesehatan (lanjutan) iii. Health care benefits (continued)

Sensitivitas dari imbalan pemeliharaan The sensitivity of the health care benefits to
kesehatan terhadap perubahan asumsi changes in the weighted principal assumptions is
aktuarial utama adalah sebagai berikut: as follows:
Dampak atas imbalan pemeliharaan kesehatan/
Impact on health care benefits
Perubahan Kenaikan Penurunan
asumsi/ asumsi/ asumsi/
Change in Increase in Decrease in
assumption assumption assumption

Tingkat diskonto 1% 5,809,316 (7,101,898) Discount rate


Tingkat kenaikan biaya kesehatan 1% (7,175,238) 5,958,103 Medical inflation rate

iv. Imbalan kerja jangka panjang lainnya iv. Other long-term benefits

Pergerakan kewajiban imbalan kerja jangka The movement in the other long-term benefits
panjang lainnya selama tahun berjalan adalah obligation over the year is as follows:
sebagai berikut:
30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Saldo awal 724,791 1,530,651 Beginning balance

Dibebankan ke laba rugi: Charged to profit or loss:


Biaya jasa kini 93,996 (500,522) Current service cost
Biaya bunga 19,599 66,089 Interest expense
(Keuntungan)/kerugian aktuarial
yang timbul dari perubahan (Gain)/loss from change in
asumsi keuangan 189 (16,093) financial assumptions
Kerugian/(keuntungan) dari
penyesuaian atas pengalaman 3,468 10,101 Experience losses/(gains)
(Keuntungan)/kerugian aktuarial
yang timbul dari kombinasi (Gain)/loss from combination of
perubahan asumsi - (111) changes in assumptions
Kerugian yang timbul dari Loss from change in
perubahan asumsi demografis - 6,103 demographic assumptions

117,252 (434,433)

Pembayaran manfaat (160,106) (371,427) Benefit payments

Saldo akhir 681,937 724,791 Ending balance

Asumsi aktuarial utama yang digunakan adalah The principal actuarial assumptions used were as
sebagai berikut: follows:
30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Tingkat diskonto 4.41% - 6.66% 4.41% - 7.60% Discount rate


Tingkat kenaikan gaji per tahun 5.00% - 7.12% 6.31% - 7.12% Rate of salary increase per annum

Sensitivitas dari imbalan kerja jangka panjang The sensitivity of the other long-term benefits to
lainnya terhadap perubahan asumsi aktuarial changes in the weighted principal assumptions is
utama adalah sebagai berikut: as follows:

Dampak atas imbalan kerja jangka panjang lainnya/


Impact on other long-term benefits
Perubahan Kenaikan Penurunan
asumsi/ asumsi/ asumsi/
Change in Increase in Decrease in
assumption assumption assumption

Tingkat diskonto 1% 18,000 (19,960) Discount rate


Tingkat kenaikan gaji 1% (21,394) 19,693 Salary growth rate
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/144 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan) 49. EMPLOYEE BENEFITS LIABILITIES (continued)

Grup terekspos dengan beberapa risiko melalui The Group is exposed to a number of risks through its
program manfaat pasti dan program kesehatan defined benefit pension program and post-employment
pascakerja. Risiko yang paling signifikan adalah medical plans. The most significant risks are as
sebagai berikut: follows:

Volatilitas aset Asset volatility

Kewajiban program dihitung menggunakan tingkat The plan liabilities are calculated using a discount rate
diskonto yang merujuk kepada Zero Coupon Bond set with reference to the Zero-Coupon Bond from
dari Indonesia Government Securities Yield Curve. Indonesia Government Securities Yield Curve. If plan
Jika imbal hasil aset program lebih rendah, maka assets underperform this yield, this will create a deficit.
akan menghasilkan defisit program.

Grup menempatkan investasi aset program pada The Group places its investment plan assets in various
beragam jenis aset investasi agar dapat types of investment assets so that it can be properly
terdiversifikasi dengan baik sehingga dapat diversified to minimise the impact of the bad
meminimalisir dampak kinerja buruk dari satu aset performance of one asset on all asset groups. The
terhadap seluruh kelompok aset. Proporsi terbesar largest proportion of assets is invested in debt
aset investasi ditempatkan pada instrumen utang, instruments, although the Group also invests in
meskipun Grup juga berinvestasi pada tabungan, savings, time deposits, equity instruments and
deposito, instrumen ekuitas, dan properti. Grup property. The Group believes that debt instruments
meyakini bahwa instrumen utang memberikan imbal offer the best returns over the long term with an
hasil yang paling baik dalam jangka panjang pada acceptable level of risk.
tingkatan risiko yang dapat diterima.

Harapan umur hidup Life expectancy

Sebagian besar dari kewajiban program The majority of the plans’ obligations are to provide
menyediakan manfaat seumur hidup, sehingga benefits for the life of the members, so increases in life
kenaikan harapan umur hidup akan mengakibatkan expectancy will result in an increase in the plans’
kenaikan liabilitas program. liabilities.

Rata-rata durasi kewajiban manfaat pasti untuk The weighted average duration of the defined benefit
program pensiun, imbalan pascakerja lainnya, obligations for the pension program, other post-
imbalan pemeliharaan kesehatan dan imbalan kerja employment benefits program, health-care benefits,
jangka panjang lainnya adalah 10,27 tahun, 13,80 and other long-term benefits are 10.27 years, 13.80
tahun, 14,58 tahun dan 4,36 tahun secara years, 14.58 years and 4.36 years, respectively.
berurutan.

Manajemen Grup berpendapat bahwa liabilitas The management of the Group believes that the
imbalan pascakerja cukup untuk menutupi semua estimated liability provided for post-employment
imbalan yang diatur dalam Peraturan benefits is adequate to cover the requirements of the
Ketenagakerjaan dan/atau PKB. Manpower Regulations and/or CLA.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/145 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

50. INFORMASI ARUS KAS 50. CASH FLOW INFORMATION

a. Transaksi non-kas a. Non-cash transactions

Tabel di bawah ini menjelaskan perubahan The table below details changes in the Group’s
dalam liabilitas Grup yang timbul dari aktivitas liabilities arising from investing and financing
investasi dan pendanaan, termasuk perubahan activities, including both cash and non-cash
yang timbul dari arus kas dan perubahan changes. Liabilities arising from financing
nonkas. Liabilitas yang timbul dari aktivitas activities are those for which cash flow were, or
pendanaan adalah liabilitas yang arus kas, atau future cash flows will be, classified in the Group’s
arus kas masa depannya, diklasifikasikan dalam consolidated statements of cash flows as cash
laporan arus kas konsolidasian Grup sebagai flows from financing activities.
arus kas dari aktivitas pendanaan.

Pengungkapan tambahan atas aktivitas Supplemental disclosures on non-cash investing


investasi dan pendanaan non-kas adalah and financing activities are as follows:
sebagai berikut:

2023 2022
(Enam bulan/ (Enam bulan/
Six months) Six months

Aktivitas investasi dan pendanaan Non-cash investing and


yang tidak mempengaruhi kas: financing activities:

Perolehan aset tetap dan pekerjaan Additions to property, plant and


dalam pelaksanaan melalui equipment and construction in progress
penarikan pinjaman dan through drawdown of loans
utang proyek 8,813,889 11,200,478 and project cost payables
Penambahan aset hak guna Addition of right-of-use assets
melalui utang sewa 3,426,139 228,876 through lease liabilities
Penambahan piutang pihak berelasi Additions of receivables from related
atas piutang dividen - - parties from dividend receivable
Penambahan rekening bank dan
deposito berjangka dibatasi
penggunaannya dengan Placement of restricted cash in banks
reklasifikasi dari deposito and time deposits through
berjangka - - reclassification from time deposits
Penambahan rekening bank dan
deposito berjangka dibatasi Placement of restricted cash in banks
penggunaannya dengan and time deposits through
reklasifikasi dari deposito reclassification from
jangka panjang - - long-term time deposits

b. Rekonsiliasi liabilitas yang timbul dari b. Reconciliation of liabilities arising from


aktivitas pendanaan financing activities

Liabilitas yang timbul dari aktivitas pendanaan The reconciliation of liabilities arising from
untuk periode yang berakhir pada tanggal 30 financing activities for the periods ended June 30,
Juni 2023 dan 31 Desember 2022 adalah 2023 and December 31, 2022 is as follows:
sebagai berikut:

30 Juni/ June 30, 2023


Perubahan
Saldo awal/ lainnya/ Saldo akhir/
Beginning Penambahan/ Pembayaran/ Other Ending
balance Additions Repayments changes*) balance

Penerusan pinjaman 33,184,714 89,313 (1,446,201) (2,549,747) 29,278,079 Two-step loans


Utang kepada lembaga keuangan Non-bank Government financial
Pemerintah non-bank 2,952,823 - (375,000) 10,601 2,588,424 institution loans
Utang bank 152,410,118 914,003 (16,952,136) (4,099,639) 132,272,346 Bank loans
Utang obligasi dan sukuk ijarah 201,334,421 - (877,700) (6,111,568) 194,345,153 Bonds payable and sukuk ijara
Utang sewa 12,862,315 - (1,351,919) 430,685 11,941,081 Lease liabilities
Utang listrik swasta 6,240,746 - (251,830) (235,914) 5,753,002 Electricity purchase payables
Utang KIK - EBA - - - - - KIK - EBA loans

Jumlah 408,985,137 1,003,316 (21,254,787) (12,555,582) 376,178,085 Total

*) Termasuk perubahan selisih kurs dan amortisasi biaya transaksi *) Including foreign exchange difference and amortisation of transaction costs
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/146 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

50. INFORMASI ARUS KAS (lanjutan) 50. CASH FLOW INFORMATION (continued)
b. Rekonsiliasi liabilitas yang timbul dari b. Reconciliation of liabilities arising from
aktivitas pendanaan (lanjutan) financing activities (continued)
31 Desember/ December 31, 2022
Perubahan
Saldo awal/ lainnya/ Saldo akhir/
Beginning Penambahan/ Pembayaran/ Other Ending
balance Additions Repayments changes*) balance

Penerusan pinjaman 34,699,205 876,645 (2,831,819) 440,683 33,184,714 Two-step loans


Utang kepada lembaga keuangan Non-bank Government financial
Pemerintah non-bank 3,686,177 - (758,423) 25,069 2,952,823 institution loans
Utang bank 165,886,409 38,342,458 (58,828,734) 7,009,985 152,410,118 Bank loans
Utang obligasi dan sukuk ijarah 193,155,035 - (5,345,442) 13,524,828 201,334,421 Bonds payable and sukuk ijara
Utang sewa 15,041,943 2,773,086 (4,721,269) (231,445) 12,862,315 Lease liabilities
Utang listrik swasta 6,168,756 - (477,008) 548,998 6,240,746 Electricity purchase payables
Utang KIK - EBA 569,578 - (587,288) 17,710 - KIK - EBA loans

Jumlah 419,207,103 41,992,189 (73,549,983) 21,335,828 408,985,137 Total

*) Termasuk perubahan selisih kurs dan amortisasi biaya transaksi*) Including foreign exchange difference and amortisation of transaction costs

51. TRANSAKSI DAN SALDO DENGAN PIHAK 51. TRANSACTIONS AND BALANCES WITH
BERELASI RELATED PARTIES

Sifat hubungan berelasi Nature of related parties

a. Pemerintah dalam hal ini adalah Menteri a. The Government in this case is the Minister of
Keuangan Republik Indonesia yang merupakan Finance of the Republic of Indonesia, the
pemegang saham Perusahaan dan BUMN. shareholder of the Company and SOEs.
b. Perusahaan mempunyai hubungan berelasi b. The Company is related to other SOEs owned by
dengan BUMN lainnya yang dimiliki bersama the Ministry of Finance.
oleh Kementerian Keuangan.
c. Grup mempunyai pengaruh signifikan atas c. The Group has significant influence on
investasi pada entitas asosiasi atau ventura investments in associates or joint ventures
bersama (Catatan 9). (Note 9).
d. Dewan Komisaris dan Direksi merupakan d. The Board of Commissioners and Directors are
personil manajemen kunci Grup. members of the key management of the Group.
Berikut ini adalah daftar pihak berelasi yang memiliki Below is the list of related parties that engage in
transaksi dengan Grup: transactions with the Group:
Pihak-pihak berelasi/ Sifat hubungan/ Sifat transaksi/
Related parties Nature of relationship Nature of transaction
Pemerintah Republik Indonesia/ Pemegang saham akhir/ Penerimaan subsidi listrik dan kompensasi, penerimaan
Government of the Republic of Indonesia Ultimate shareholder penerusan pinjaman, dan utang kepada pemerintah/
("Pemerintah") Receipt of electricity subsidy and compensation, two-step
loan and Government loans
BRI Pengendalian melalui Pemerintah Penempatan rekening bank dan deposito berjangka
Republik Indonesia/ dibatasi penggunaannya, kas dan setara kas, investasi
Control through the Government of the jangka pendek, dan penerimaan utang bank/
Republic of Indonesia Placement of restricted cash in banks and time deposits,
cash and cash equivalents, short-term investments, and
receipt of bank loans
Bank Mandiri Pengendalian melalui Pemerintah Penempatan rekening bank dan deposito berjangka
Republik Indonesia/ dibatasi penggunaannya, kas dan setara kas, investasi
Control through the Government of the jangka pendek, dan penerimaan utang bank/
Republic of Indonesia Placement of restricted cash in banks and time deposits,
cash and cash equivalents, short-term investments, and
receipt of bank loans
BNI Pengendalian melalui Pemerintah Penempatan rekening bank dan deposito berjangka
Republik Indonesia/ dibatasi penggunaannya, kas dan setara kas, dan
Control through the Government of the penerimaan utang bank/
Republic of Indonesia Placement of restricted cash in banks and time deposits,
cash and cash equivalents, and receipt of bank loans
Bank DKI Entitas yang berhubungan dengan Penempatan kas dan setara kas dan penerimaan
Pemerintah/ utang bank/Placement of cash and cash equivalents and
Government related entity receipt of bank loans
Bank Pembangunan Daerah (“BPD”) Entitas yang berhubungan dengan Penempatan kas dan setara kas dan penerimaan
Pemerintah/ utang bank/Placement of cash and cash equivalents and
Government related entity receipt of bank loans
BTN Pengendalian melalui Pemerintah Penempatan kas dan setara kas dan penerimaan utang
Republik Indonesia/ bank/Placement of cash and cash equivalents and
Control through the Government of the receipt of bank loans
Republic of Indonesia
BSI Pengendalian melalui Pemerintah Penempatan kas dan setara kas dan penerimaan utang
Republik Indonesia/ bank/Placement of cash and cash equivalents and
Control through the Government of the receipt of bank loans
Republic of Indonesia
LPEI Pengendalian melalui Pemerintah Penerimaan utang bank/Receipt of bank loans
Republik Indonesia/
Control through the Government of the
Republic of Indonesia
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/147 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK 51. TRANSACTIONS AND BALANCES WITH
BERELASI (lanjutan) RELATED PARTIES (continued)

Sifat hubungan berelasi (lanjutan) Nature of related parties (continued)


Pihak-pihak berelasi/ Sifat hubungan/ Sifat transaksi dan saldo/
Related parties Nature of relationship Nature of transaction and balance

PT Pertamina Geothermal Energy (“PGE”) Pengendalian melalui Pemerintah Transaksi pembelian tenaga listrik/
Republik Indonesia/ Purchase of electricity
Control through the Government of the
Republic of Indonesia

Pertamina Pengendalian melalui Pemerintah Transaksi pembelian bahan bakar dan minyak pelumas/
Republik Indonesia/ Purchase of fuels and lubricants
Control through the Government of the
Republic of Indonesia

PT Pertamina Gas (“Pertagas”) Pengendalian melalui Pemerintah Transaksi pembelian bahan bakar gas/
Republik Indonesia/ Purchase of gas
Control through the Government of the
Republic of Indonesia

PT Bukit Asam Tbk (“PTBA”) Pengendalian melalui Pemerintah Transaksi pembelian bahan bakar batubara/
Republik Indonesia/ Purchase of coal
Control through the Government of the
Republic of Indonesia

PT Perusahaan Gas Negara (Persero) Tbk Pengendalian melalui Pemerintah Transaksi pembelian bahan bakar gas/
(“PGN”) Republik Indonesia/ Purchase of gas
Control through the Government of the
Republic of Indonesia

NR Pengendalian melalui Pemerintah Transaksi pembelian bahan bakar gas/


Republik Indonesia/ Purchase of gas
Control through the Government of the
Republic of Indonesia

PT Asuransi Jasa Indonesia (Persero) (“AJI”) Pengendalian melalui Pemerintah Asuransi bangunan, instalasi dan mesin pembangkit,
Republik Indonesia/ perlengkapan transmisi serta kapal milik Perusahaan/
Control through the Government of the Insurance services for the Company's buildings,
installation
Republic of Indonesia and power plant, transmission equipment and vessels

Perum Jasa Tirta Pengendalian melalui Pemerintah Transaksi pembelian tenaga listrik/
Republik Indonesia/ Purchase of electricity
Control through the Government of the
Republic of Indonesia

SMI Pengendalian melalui Pemerintah Penerimaan utang dari lembaga


Republik Indonesia/ keuangan pemerintah nonbank/
Control through the Government of the Receipt of non-bank government financial institution loans
Republic of Indonesia

PT Perusahaan Pengelola Aset (Persero) (“PPA”) Pengendalian melalui Pemerintah Penerimaan utang dari lembaga
Republik Indonesia/ keuangan pemerintah nonbank/
Control through the Government of the Receipt of non-bank government financial institution loans
Republic of Indonesia

GDE Entitas asosiasi/Associate Transaksi pembelian tenaga listrik/Purchase of electricity

TJK Entitas asosiasi/Associate Transaksi pembelian tenaga listrik/Purchase of electricity

DEB Entitas asosiasi/Associate Transaksi pembelian tenaga listrik/Purchase of electricity

MEB Entitas asosiasi/Associate Transaksi pembelian tenaga listrik/Purchase of electricity

RDM Entitas asosiasi/Associate Transaksi pembelian tenaga listrik/Purchase of electricity

S2P Entitas asosiasi/Associate Transaksi pembelian tenaga listrik/Purchase of electricity

BDSN Ventura bersama/Joint venture Transaksi pembelian tenaga listrik/Purchase of electricity

Komipo PJB Ventura bersama/Joint venture Transaksi pembelian tenaga listrik/Purchase of electricity

BPI Ventura bersama/Joint venture Transaksi pembelian tenaga listrik/Purchase of electricity

SGPJB Ventura bersama/Joint venture Pemberian pinjaman jangka panjang dan transaksi
pembelian tenaga listrik/Issuance of long-term loans
and purchase of electricity

PDG Ventura bersama/Joint venture Pemberian pinjaman jangka panjang/


Issuance of long-term loans

PMSE Ventura bersama/Joint venture Pemberian pinjaman jangka panjang/


Issuance of long-term loans

REP Ventura bersama/Joint venture Pemberian pinjaman jangka panjang dan transaksi
pembelian tenaga listrik/Issuance of long-term loans
and purchase of electricity

GCL Ventura bersama/Joint venture Pemberian pinjaman jangka panjang/


Issuance of long-term loans
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/148 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK 51. TRANSACTIONS AND BALANCES WITH
BERELASI (lanjutan) RELATED PARTIES (continued)
Sifat hubungan berelasi (lanjutan) Nature of related parties (continued)

Pihak-pihak berelasi/ Sifat hubungan/ Sifat transaksi dan saldo/


Related parties Nature of relationship Nature of transaction and balance

PT Waskita Karya (Persero) Tbk (“WK”) Pengendalian melalui Pemerintah Transaksi jasa konstruksi/
Republik Indonesia/ Construction services
Control through the Government of
the Republic of Indonesia

PT Wijaya Karya (Persero) Tbk (“Wika”) Pengendalian melalui Pemerintah Transaksi jasa konstruksi/
Republik Indonesia/ Construction services
Control through the Government of
the Republic of Indonesia

PT Pelabuhan Indonesia (Persero) Pengendalian melalui Pemerintah Utang sewa/


Republik Indonesia/ Lease liabilities
Control through the Government of
the Republic of Indonesia

Dana Pensiun PLN Pengendalian melalui Pemerintah Utang sewa/


Republik Indonesia/ Lease liabilities
Control through the Government of
the Republic of Indonesia

PT Djakarta Llyod Pengendalian melalui Pemerintah Utang sewa/


Republik Indonesia/ Lease liabilities
Control through the Government of
the Republic of Indonesia

Pemerintah Daerah Entitas yang berhubungan dengan Utang lain-lain/


Pemerintah/Government related entity Other payables

Rincian transaksi dan saldo dengan pihak Details of transactions and balances with related
berelasi: parties:
Catatan/ 30 Juni 2023/ June 30, 2023 31 Desember/ December 31, 2022
Notes Rp % *) Rp % *)
Piutang pihak berelasi 10 Receivables from related parties
SGPJB 808,728 0.00 849,106 0.00 SGPJB
REP 413,780 0.00 415,493 0.00 REP
PDG 54,855 0.00 79,733 0.00 PDG
PMSE 10,430 0.00 11,181 0.00 PMSE
GCL 70,422 0.00 70,422 0.00 GCL
Lain lain 702,667 0.00 93,342 0.00 Others

Subjumlah 2,060,882 0.00 1,519,278 0.00 Subtotal

Rekening bank dan deposito berjangka 11


dibatasi penggunaannya Restricted cash in banks and time deposits
Bank Mandiri 29,013 0.00 174,285 0.00 Bank Mandiri
Bank Negara Indonesia 49 0.00 1,285 0.00 Bank Negara Indonesia
Bank Rakyat Indonesia - - 181,314 0.00 Bank Rakyat Indonesia

Subjumlah 29,062 0.00 356,884 0.00 Subtotal

Kas dan setara kas 13 Cash and cash equivalents


Bank Negara Indonesia 11,346,186 0.01 18,429,389 0.01 Bank Negara Indonesia
Bank Rakyat Indonesia 6,555,293 0.00 17,953,182 0.01 Bank Rakyat Indonesia
Bank Mandiri 8,415,182 0.01 11,040,220 0.01 Bank Mandiri
Bank Tabungan Negara 418,395 0.00 750,486 0.00 Bank Tabungan Negara
Bank DKI 477,531 0.00 491,401 0.00 Bank DKI
Bank Syariah Indonesia 348,927 0.00 663,292 0.00 Bank Syariah Indonesia

Subjumlah 27,561,515 0.02 49,327,970 0.03 Subtotal


Investasi jangka pendek 14 Short-term investment
Bank Rakyat Indonesia 33,687 0.00 297,527 0.00 Bank Rakyat Indonesia
Bank Mandiri 749,850 0.00 179,182 0.00 Bank Mandiri
Bank Negara Indonesia 140,288 0.00 36,578 0.00 Bank Negara Indonesia

Subjumlah 923,826 0.00 513,287 0.00 Subtotal

Piutang usaha 15 Trade accounts receivable


Entitas yang berelasi dengan Pemerintah 2,244,150 0.00 2,347,650 0.00 State-Owned Enterprises

Piutang Pemerintah 16 48,528,597 0.03 21,470,499 0.01 Receivables from Government

Jumlah 81,348,031 0.05 75,535,568 0.05 Total

Penerusan pinjaman 24 29,278,078 0.20 33,184,714 0.23 Two-step loans

Utang kepada Pemerintah dan lembaga Government and non-bank Government


keuangan Pemerintah non-Bank 25 financial institution loans
SMI 2,588,424 0.02 2,952,823 0.02 SMI
Pemerintah Republik indonesia 2,188,000 0.01 675,985 0.00 Government of the Republic of Indonesia
PPA - - PPA

Subjumlah 4,776,424 0.03 3,628,809 0.03 Subtotal

*) Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang *) Percentage to related total assets/liabilities/revenues/expenses


bersangkutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/149 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK 51. TRANSACTIONS AND BALANCES WITH
BERELASI (lanjutan) RELATED PARTIES (continued)
Rincian transaksi dan saldo dengan pihak Details of transactions and balances with related
berelasi: (lanjutan) parties: (continued)
Catatan/ 30 Juni 2023/ June 30, 2023 31 Desember/ December 31, 2022
Notes Rp % *) Rp % *)

Utang Sew a 26 Lease Liabilities


PT Pelabuhan Indonesia (Persero) 755,964 0.00 754,166 0.00 PT Pelabuhan Indonesia (Persero)
Dana Pensiun PLN 974,669 0.00 399,553 0.00 Dana Pensiun PLN
PT Djakarta Llyod - - 103,652 0.00 PT Djakarta Llyod

Subjumlah 1,730,633 0.00 1,257,372 0.00 Subtotal

Utang bank 27 Bank loans


Bank Negara Indonesia 4,440,714 0.03 4,678,987 0.03 Bank Rakyat Indonesia
Bank Mandiri 11,167,173 0.07 12,109,421 0.08 Bank Mandiri
Bank Syariah Indonesia 2,135,650 0.01 2,224,244 0.02 Bank Syariah Indonesia
Bank Rakyat Indonesia 8,089,882 0.05 9,346,371 0.06 Bank Negara Indonesia
Bank Tabungan Negara 3,178,571 0.02 3,465,011 0.02 Bank Tabungan Negara
Bank DKI 369,643 0.00 451,786 0.00 Bank DKI
Bank Jateng 64,286 0.00 78,571 0.00 Bank Jateng
BPD Aceh 32,143 0.00 39,286 0.00 BPD Aceh
Bank Kalteng 32,143 0.00 39,286 0.00 Bank Kalteng
Bank Riau 32,143 0.00 39,286 0.00 Bank Riau
Bank Kalbar 32,143 0.00 39,286 0.00 Bank Kalbar
BPD Bali 24,107 0.00 29,464 0.00 BPD Bali
SMI 2,539,287 0.02 2,925,001 0.02 SMI
LPEI 655,500 0.00 1,018,472 0.01 LPEI
BPD Papua 369,643 0.00 401,786 0.00 BPD Papua

Subjumlah 33,163,028 0.22 36,886,257 0.25 Subtotal


-
Utang usaha 31 - Trade accounts payable
Pertamina 5,127,146 0.01 4,190,071 0.01 Pertamina
S2P 2,254,569 0.00 1,603,246 0.00 S2P
SGPJB 1,952,583 0.00 1,776,933 0.00 SGPJB
Pertagas 34,878 0.00 2,412,447 0.00 Pertagas
PTBA 1,188,867 0.00 1,243,733 0.00 PTBA
PGE 1,397,347 0.00 1,704,639 0.00 PGE
PGN 503,204 0.00 439,748 0.00 PGN
NR 56,335 0.00 124,380 0.00 NR
dari jumlah utang usaha) trade accounts payable)
Pengendalian melalui Pemerintah Control through the Government of the
Republik Indonesia 813,545 0.00 551,553 0.00 Republic of Indonesia
Entitas asosiasi 240,289 0.00 273,462 0.00 Associates
Ventura Bersama 971,729 0.00 891,861 0.00 Joint ventures
Subjumlah 14,540,492 0.02 15,212,073 0.02 Subtotal

Utang lain-lain 32 Other payables


WK 1,754,586 0.01 2,320,373 0.02 WK
Pemerintah Daerah 2,491,202 0.02 2,317,377 0.02 Local Government
WIKA 626,932 0.00 603,331 0.00 WIKA
Lainnya 38,601 0.00 145,474 0.00 Others
4,911,322 0.03 5,386,555 0.04
Biaya masih harus dibayar 34 Accrued expenses
Penerusan pinjaman 307,448 0.00 274,072 0.00 Two-step loans
Utang bank Bank loans
Bank Negara Indonesia 79,223 0.00 63,552 0.00 Bank Negara Indonesia
Bank Mandiri 126,129 0.00 114,017 0.00 Bank Mandiri
Bank Syariah Indonesia 46,331 0.00 38,229 0.00 Bank Syariah Indonesia
Bank Rakyat Indonesia 46,125 0.00 40,836 0.00 Bank Rakyat Indonesia
Bank Tabungan Negara 39,433 0.00 39,791 0.00 Bank Tabungan Negara
Bank DKI 423 0.00 593 0.00 Bank DKI
PT Sarana Multi Infrastruktur 10,979 0.00 11,863 0.00 PT Sarana Multi Infrastruktur
Lembaga Pembiayaan Ekspor Indonesia 2,896 0.00 4,185 0.00
Lembaga Pembiayaan Ekspor Indonesia
Pihak berelasi lainnya 693 0.00 829 0.00 Other related parties

Subjumlah 659,679 0.00 587,967 0.00 Subtotal

Jumlah 168,677,054 0.48 170,421,942 0.55 Total

30 Juni/ 30 Juni/
June 30, June 30,
2023 2022
Catatan/ Rp % *) Rp % *)
Notes
Penjualan tenaga listrik 37 Sale of electricity
Entitas yang berelasi dengan Pemerintah 10,704,316 0.07 9,224,837 0.06 State-Owned Enterprises

Subsidi listrik Pemerintah 38 32,069,605 1.00 26,189,358 1.00 Government's electricity sub sidy

Pendapatan kompensasi 16 37,857,021 1.00 31,226,632 100.00 Compensation income

Pendapatan usaha lain lain 38 Other Revenues


SGPJB 308,719 0.08 787,032 0.24 SGPJB
GCL 173,754 0.04 180,921 0.05 GCL
S2P 204,815 0.05 45,710 0.01 S2P
Lain lain 312,059 0.08 924 0.00 Others

Jumlah 999,347 0.25 1,014,586 35.66 Total

*) Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang *) Percentage to related total assets/liabilities/revenues/expenses


bersangkutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/150 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK 51. TRANSACTIONS AND BALANCES WITH
BERELASI (lanjutan) RELATED PARTIES (continued)

Rincian transaksi dan saldo dengan pihak Details of transactions and balances with related
berelasi: (lanjutan) parties: (continued)
30 Juni/ 30 Juni/
June 30, June 30,
2023 2022
Catatan/ Rp % *) Rp % *)
Notes
Beban bahan bakar dan pelumas 40 Fuel and lubricants expense
Pertamina 13,380,426 0.18 2,338,191 0.03 Pertamina
NR 174,205 0.00 3,057,184 0.04 NR
PGN 3,959,165 0.05 3,768,520 0.05 PGN
PTBA 4,788,681 0.06 5,768,289 0.08 PTBA
Lainnya 3,099,533 0.04 1,562,627 0.02 Others
Jumlah 25,402,010 0.34 16,494,811 0.24 Total

Beban pembelian tenaga listrik 41 Purchased electricity expenses


SSP 6,992,304 0.10 7,197,189 0.12 PT Sumber Segara Primadaya
SGPJB 5,065,051 0.07 5,059,445 0.09 PT Shenhua Guohua PJB
PGE 5,414,750 0.07 1,329,841 0.02 PT Pertamina Geothermal Energy
BDSN 437,237 0.01 444,187 0.01 PT Bajradaya Sentranusa
GDE 491,826 0.01 397,197 0.01 PT Geo Dipa Energi (Persero)
BPI 764,856 0.01 701,535 0.01 PT Bukit Pembangkit Innovative
TJK 241,007 0.00 245,724 0.00 PT Tanjung Kasam Power
REP 145,126 0.00 141,490 0.00 PT Rajamandala Electric Power
Perum Jasa Tirta 97,953 0.00 60,059 0.00 Perum Jasa Tirta
MEB 27,008 0.00 21,657 0.00 PT Mitra Energi Batam
DEB 78,293 0.00 97,280 0.00 PT Dalle Energy Batam
RDM 154,697 0.00 201,978 0.00 PT Rekind Daya Mamuju
Lainnya 326,472 0.00 100,529 0.00 Others

Jumlah 20,236,581 0.27 15,998,111 0.27 Total

Beban pemeliharaan 43 Maintenance expenses


KOMIPO PJB 170,066 0.01 155,555 0.01 KOMIPO PJB
Lainnya 1,553,770 0.13 19,750,595 1.90 Others
Jumlah 1,723,837 0.14 19,906,149 1.91 Total

Beban Kepegaw aian 44 Employee expenses


Biof arma Biofarma
Kimia Farma 4,480 0.00 106,163 0.01 Kimia Farma
Lain lain 6,390 0.00 - - Others
Jumlah 10,869 0.00 106,163 0.01

Beban usaha lain-lain 45 Other operating expenses


Asuransi Insirance
AJI 148,572 0.04 205,107 0.07 AJI
Lainnya 243,946 0.06 211,884 0.07 Others
Utang Bank 1,020,486 0.09 856,389 (0.09) Bank Loans
Penerusan Pinjaman 448,027 0.04 292,225 (0.03) Two - Step Loans
Instrumen derivatif 951,983 0.09 - 289,554 0.03 Derivative Instrumen
Utang Kepada Pemerintah dan Lembaga - - Government and non-bank Government
Keuangan Pemerintah non - Bank 84,866.00 0.01 107,545 (0.01) inancial institution loans
Jumlah 2,505,362 0.23 966,605 (0.10) Total

*) Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang *) Percentage to related total assets/liabilities/revenues/expenses


bersangkutan

Jumlah kompensasi Dewan Komisaris Perusahaan Total compensation of the Company’s Board of
untuk periode enam bulan berakhir pada tanggal Commissioners for the six-month periods ended June
30 Juni 2023 dan 2022 masing-masing adalah 30, 2023 and 2022 amounted to Rp19,986 and
sebesar Rp19.986 dan Rp18.585. Rp18,585, respectively.

Jumlah kompensasi Direksi Perusahaan untuk Total compensation of the Company’s Board of
periode enam bulan berakhir pada tanggal Directors for the six-month periods ended June 30,
30 Juni 2023 dan 2022 masing-masing adalah 2023 and 2022 amounted to Rp33,799 and 35,110.
sebesar Rp33.799 dan 35.110.

Seluruh kompensasi kepada Dewan Komisaris dan All the compensation to the Company’s Boards of
Direksi Perusahaan merupakan imbalan kerja Commissioners and Directors represent short-term
jangka pendek. employee benefits.

Informasi mengenai kontribusi yang dilakukan Grup Information about the contributions made by the Group
ke DP-PLN diungkapkan di Catatan 49. to DP-PLN is disclosed in Note 49.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/151 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

52. ASET DAN LIABILITAS MONETER DALAM MATA 52. MONETARY ASSETS AND LIABILITIES
UANG ASING DENOMINATED IN FOREIGN CURRENCIES

Pada tanggal 30 Juni 2023 dan 31 Desember 2022, As at June 30, 2023 and December 31, 2022, the
Grup mempunyai aset dan liabilitas moneter dalam Group had monetary assets and liabilities in foreign
mata uang asing sebagai berikut: currencies as follows:

30 Juni 2023/ June 30, 2023


Lain-lain/
JPY*) USD EUR*) Others**)
Aset moneter Monetary assets
Piutang pihak berelasi - 137,392,063 - - Receivables from related parties
Rekening bank dan deposito berjangka Restricted cash in banks
dibatasi penggunaannya 41,973,163,289 55,046,822 - - and time deposits
Kas dan setara kas 1,800,535,428 391,972,629 9,712,942 1,611,327 Cash and cash equivalents
Inevestasi jangka pendek 50,896,223 - - Short term investment
Jumlah aset moneter 43,773,698,717 635,307,737 9,712,942 1,611,327 Total monetary assets

Liabilitas moneter Monetary liabilities


Penerusan pinjaman 145,983,023,000 926,033,944 10,325,171 - Two-step loans
Utang sewa pembiayaan 26,084,159,086 35,286,172 - - Lease liabilities
Utang bank 75,949,990,955 4,279,220,096 922,812,164 - Bank loans
Utang obligasi dan sukuk ijarah 19,500,000,000 10,188,312,000 1,000,000,000 - Bonds payable and sukuk ijara
Utang listrik swasta - 383,533,441 - - Electricity purchase payable
Utang lain-lain 4,119,572,339 127,134,158 12,394,853 - Other payables
Utang biaya proyek 4,785,693,060 33,220,543 1,972,417 - Project cost payable
Utang usaha - 1,283,154,284 - 11,684,105 Trade payables
Biaya yang masih harus dibayar 3,356,981,110 197,000,852 19,131,693 - Accrued expenses
Jumlah liabilitas moneter 279,779,419,549 17,452,895,489 1,966,636,299 11,684,105 Total monetary liabilities

Liabilitas moneter bersih (236,005,720,832) (16,817,587,752) (1,956,923,357) (10,072,778) Net monetary labilities
Ekuivalen Rupiah (24,660,143) (252,263,816) (32,110,177) (151,092) Rupiah equivalent
Jumlah dalam Rupiah - bersih (309,185,228) Total in Rupiah - net

31 Desember/ December 31, 2022


Lain-lain/
JPY*) USD*) EUR*) Others**)
Aset moneter Monetary assets
Kas dan setara kas 1,696,886,132 535,414,834 8,933,117 9,258,917 Cash and cash equivalents
Piutang pihak berelasi - 91,452,983 - - Receivables from related parties
Rekening bank dibatasi penggunaannya 29,572,853,747 72,115,932 - - Restricted cash in banks

Jumlah aset moneter*) 31,269,739,879 698,983,749 8,933,117 9,258,917 Total monetary assets*)

Liabilitas moneter Monetary liabilities


Penerusan pinjaman 150,203,772,818 982,783,614 11,082,057 - Two-step loans
Utang sewa 39,004,601,063 38,051,779 - - Lease liabilities
Utang bank 79,285,135,954 4,976,089,965 963,714,411 - Bank loans
Utang obligasi, sukuk ijarah Bonds payable, sukuk ijara
dan KIK EBA 19,500,000,000 10,188,312,000 1,000,000,000 - and KIK EBA
Utang listrik swasta - 400,253,097 - - Electricity purchase payables
Utang lain-lain 2,684,038,768 136,858,031 25,843,620 - Other payables
Utang biaya proyek 5,179,054,039 37,996,797 2,428,825 - Project cost payables
Utang usaha - 1,339,342,186 - 11,278,625 Trade payables
Biaya masih harus dibayar 6,327,880,061 181,953,030 6,739,621 - Accrued expenses

Jumlah liabilitas moneter*) 302,184,482,703 18,281,640,499 2,009,808,534 11,278,625 Total monetary liabilities*)

Liabilitas moneter bersih*) (270,914,742,824) (17,582,656,750) (2,000,875,417) (2,019,708) Net monetary liabilities*)

Equivalent
Ekuivalen dalam jutaan Rupiah (31,956,019) (274,148,784) (33,231,739) (31,491) in millions of Rupiah

Net total -
Jumlah bersih - dalam jutaan Rupiah (339,368,033) in millions of Rupiahh

*) Dalam jumlah penuh *) In full amount


**) Aset dan liabilitas dalam mata uang asing lainnya disajikan setara USD **) Assets and liabilities denominated in other foreign currencies are presented
dengan menggunakan kurs tanggal pelaporan as USD equivalent using the exchange rate prevailing at the reporting date

Apabila aset dan liabilitas dalam mata uang asing If assets and liabilities in foreign currencies as at
pada tanggal 30 Juni 2023 dijabarkan dengan June 30, 2023 had been translated using the closing
menggunakan kurs penutupan mata uang asing rates at issuance of Juli 28, 2023, the total net foreign
pada tanggal 28 Juli 2023, maka liabilitas bersih currency liabilities of the Group would have been
dalam mata uang asing Grup akan mengalami increased by Rp Rp2,422,717 (2022: increased by
kenaikan sebesar Rp2.422.717 (2022: kenaikan Rp19,578,282 at issuance of May 2, 2023).
sebesar Rp19.578.282 pada tanggal 2 Mei 2023).
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/152 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

53. SEGMEN OPERASI 53. OPERATING SEGMENTS

Informasi wilayah geografis Geographical information

Segmen operasi disusun sesuai dengan kebijakan The operating segment information is prepared using
akuntansi yang dianut dalam penyusunan dan the accounting policies adopted for preparing and
penyajian laporan keuangan konsolidasian. presenting the consolidated financial statements.

Manajemen telah menentukan segmen operasi Management has determined the operating segments
berdasarkan laporan yang ditelaah oleh Direksi, based on reports reviewed by the Board of Directors,
yang telah diidentifikasikan sebagai pengambil which has been identified as the Group’s chief
keputusan operasional utama Grup, dalam operating decision maker and which makes strategic
mengambil keputusan strategis. Direksi decisions. The Board of Directors considers the
mempertimbangkan operasi bisnis dari perspektif business operations from the geographical operations
operasi geografis yang terdiri dari Sumatera, Jawa consisting of Sumatera, Java Bali and Nusa Tenggara,
Bali dan Nusa Tenggara, Kalimantan, Sulawesi dan Kalimantan, Sulawesi and Maluku and Papua.
Maluku dan Papua.

Untuk tujuan pelaporan manajemen, pada tanggal 30 For management reporting purposes, as at June 30,
Juni 2023 dan 31 Desember 2022, Grup dibagi dalam 2023 and December 31, 2022, the Group is divided
operasi geografis Sumatera, Jawa Bali dan Nusa into the geographical areas of Sumatera, Java Bali
Tenggara, Kalimantan, Sulawesi, Maluku dan Papua. and Nusa Tenggara, Kalimantan, Sulawesi, Maluku
Operasi geografis tersebut menjadi dasar pelaporan and Papua. These geographical operations are the
informasi segmen Grup, rinciannya adalah sebagai basis on which the Group reports segment
berikut: information, with the following details:
30 Juni/ June 30, 2023

JAWA BALI DAN


SUMATERA KALIMANTAN SULAWESI MALUKU PAPUA Jumlah
NUSA TENGGARA

Pendapatan usaha Revenue


Pendapatan eksternal 17,208,262.67 204,311,969 5,595,353.49 5,711,198.72 1,692,920.58 234,519,705 External revenue
Pendapatan antar segmen - Inter-segment revenue
Jumlah 17,208,263 204,311,969 5,595,353 5,711,199 1,692,921 234,519,705 Total revenue

Hasil segmen Segment results


Beban usaha 15,334,449 151,242,640 5,218,273.69 5,128,101.40 2,700,875.15 179,624,340 Operating expenses
Laba (Rugi) usaha 1,873,813 53,069,329 377,080 583,097 (1,007,955) 32,286,087 Operating profit/(loss)
Penghasilan (beban) lain-lain tidak Unallocated
dapat dialokasikan 1,068,423 9,006,211 330,519 489,569 87,397 10,982,118 (expenses)/revenue
Bagian atas laba bersih entitas Share in net income of
asosiasi dan ventura bersama 199,451 1,460,862 (10,171) - - 1,650,142 associates and joint ventures
Penghasilan keuangan 0.06 642,297 - 0.00 - 642,297 Finance income
Beban keuangan (1,359,884) (8,744,814) (372,445) (375,172) (178,955) (11,031,271) Finance costs
property plant and equipment
Cadangan atas ketidakpastian dalam Allowance for uncertainty
perlakuan pajak - (1,510,604) - - - (1,510,604) over tax treatment
Beban pajak - (7,101,933) - - - (7,101,933) Income tax expense
Laba (Rugi) bersih 2,942,236 54,973,606 707,598 1,072,667 (920,557) 25,916,836 Profit/(loss) for the year

Aktiva segmen Segment assets


Aset 139,428,165 1,381,529,308 49,238,297 50,735,074 25,510,951 1,646,441,796 Asset
Jumlah aktiva konsolidasi 139,428,165 1,381,529,308 49,238,297 50,735,074 25,510,951 1,646,441,796 Total consolidation assets

Kewajiban segmen Segment liabilities


Liabilitas dialokasikan 13,857,399 601,144,961 6,243,165 7,604,832 2,692,136 631,542,493
Jumlah kewajiban konsolidasi 13,857,399 601,144,961 6,243,165 7,604,832 2,692,136 631,542,493 Total consolidation liabilities

31 Desember/ December 31, 2022


Jawa Bali & Maluku & Jumlah/
Sumatera Nusa Tenggara Kalimantan Sulawesi Papua Total

Pendapatan usaha Revenue


Pendapatan eksternal 103,582,055 866,865,064 35,252,654 31,316,750 7,454,446 1,044,470,969 External revenue
Pendapatan antar segmen (59,834,211) (500,744,911) (20,363,708) (18,090,132) (4,306,064) (603,339,026) Inter-segment revenue

Jumlah pendapatan usaha 43,747,844 366,120,153 14,888,946 13,226,618 3,148,382 441,131,943 Total revenue

Hasil segmen Segment results


Beban usaha 38,532,121 (270,480,160) (14,651,411) 13,031,151 5,442,324 342,137,167 Operating expenses
Beban penyusutan 8,306,957 (29,595,207) (2,804,881) 2,394,719 954,871 44,056,635 Depreciation expenses
Laba/(rugi) usaha (3,091,234) 66,044,786 (2,567,346) (2,199,252) (3,248,813) 54,938,141 Operating profit/(loss)
(Beban)/penghasilan lain-lain
tidak dapat dialokasikan (3,245,545) (14,218,043) (832,370) (983,456) (224,378) (19,503,792) Unallocated (expenses)/revenue
Bagian atas laba bersih entitas Share in net income of
asosiasi dan ventura bersama 300,585 3,369,838 5,166 - - 3,675,589 associates and joint ventures
Penghasilan keuangan - 687,495 - - - 687,495 Finance income
Beban keuangan (3,013,682) (12,279,291) (826,600) (764,131) (251,461) (17,135,165) Finance costs
Provision for impairment of property
Penurunan nilai aset tetap (107,059) (896,516) (19,376) (13,039) - (1,035,990) plant and equipment
Cadangan atas ketidakpastian dalam Allowance for uncertainty
perlakuan pajak - (84,606) - - - (84,606) over tax treatment
Beban pajak - (7,126,952) - - - (7,126,952) Income tax expense

Laba/(rugi) bersih (9,156,935) 35,496,711 (4,240,526) (3,959,878) (3,724,652) 14,414,720 Profit/(loss) for the year

Aset segmen Segment assets


Jumlah aset konsolidasian 269,367,059 1,164,436,613 91,423,908 82,915,663 29,996,033 1,638,139,276 Total consolidated assets

Liabilitas segmen Segment Liabilities


Jumlah liabilitas konsolidasian 18,371,351 609,644,608 7,427,343 8,306,324 2,939,084 646,688,710 Total consolidated liabilities
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/153 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
KONTINJENSI CONTINGENCIES

Pada tanggal 30 Juni 2023, Grup memiliki As at June 30, 2023, the Group has significant
perjanjian penting sebagai berikut: agreements, as follows:

a. Perjanjian pengadaan bahan bakar a. Fuel supply agreements

Gas Gas

Sektor/ Pemasok/ Periode/ Satuan/ Kuantitas/


Sector Supplier Period Unit Quantity

PLN HOLDING

Muara Tawar Medco EP Lematang 2009-2018 BBTU 129.136

PIP
Tambak Lorok PT Sumber Petrindo Perkasa (SPP) 2007-2029 BBTUD 50
Grati Medco Energy Sampang Pty Ltd 2003-2023 BBTUD 30
Grati PT Inti Alasindo Energy 2023-2025 BBTUD 40
MPP Sorong PT Malamoi Olom Wobok 2021-2025 BBTUD 8
Cilegon, Priok PT Perusahaan Gas Negara (PGN) 2019-2030 BBTUD 145.2
Priok PT Nusantara Regas 2012-2023 BBTUD 200
Priok, Pesanggaran Tangguh PSC Contract Parties (BP) 2014-2034 Kargo 22

-PT Pertamina (Persero)


-ENI East Sepinggan Ltd
Priok, Pesanggaran 2023 Kargo 7
-Neptune Energy East Sepinggan B.V
-PT Pertamina Hulu Energi East Sepinggan

Tambak Lorok PT Perusahaan Gas Negara (PGN) 2021-2023 BBTUD 15


Tambak Lorok PT Pertamina (Persero) 2017-2035 BBTUD 100
Grati Kangean Energy Indonesia Ltd 2005-2028 BBTUD 40
Grati Husky-CNOOC Madura Limited 2023 BBTUD 25-50
UPDK Jambi PT Energasindo Heksa Karya 2007-2023 BBTUD 18
UPDK Keramasan PT Pertamina EP 2011-2023 BBTUD 3
-PT Medco E&P Lematang
UPDK Keramasan 2017-2027 BBTUD 27
-PT Medco E&P Indonesia
UPDK Mahakam PT Pertamina (Persero) 2005-2023 BBTUD 8
UPDK Mahakam PT Pertamina EP 2022-2024 MMSCFD 5
UPDK Mahakam PT Pertagas Niaga 2017-2023 BBTUD 8
MPP Sorong PT Perta Daya Gas 2021-2040 MMSCFD 8
Grati PT Pertamina Gas 2014-2033 MMSCFD 100
Pesanggaran Konsorsium Midstream LNG Bali 2017-2023 BBTUD 50
Pesanggaran PT Benoa Gas Terminal 2019-2026 BBTUD 51
Tambak Lorok PT Perta Daya Gas 2013-2029 BBTUD 17
Grati PT Enviromate Technology International 2013-2023 MMSCFD 15
Cilegon PT Triguna Internusa Pratama 2009-2024 MMSCFD 45
Cilegon PT Triguna Internusa Pratama 2021-2024 MMSCFD 15
UPDK Jambi PT Energasindo Heksa Karya 2016-2030 MMSCFD 5
UPDK Keramasan PT Mitra Energi Gas Sumatera (MEGS) 2020-2027 MMSCFD 10
UPDK Keramasan PT Pertamina Gas 2019-2023 MMSCFD 2
Indralaya: 6.66;
UPDK Keramasan PT Pertamina Gas 2014-2027 MMSCFD Borang: 9.14
Keramasan: 1.95
UPDK Mahakam PT Pertamina Gas 2013-2028 MMSCFD 5
UPDK Mahakam PT PLN Gas dan Geothermal 2021-2046 MMSCFD 20

PNP
UP MUARA KARANG Pertamina Hulu Energi ONWJ 2023 BBTUD 15
UP MUARA KARANG Pertamina Gas Negara 2022 - 2023 BBTUD 15
UP MUARA TAWAR Pertamina EP 2018 - 2024 BBTUD 12
UP MUARA TAWAR Pertamina Gas Negara 2022 - 2023 BBTUD 20.3
UP GRESIK Pertamina Hulu Energi WMO 2023 BBTUD 12.8
UP GRESIK Kangean Energy Indonesia Limited 2008 - 2028 BBTUD 40
UP GRESIK Saka Indonesia Pangkah Limited 2011 - 2026 BBTUD 37
UP GRESIK Petrogas Jatim Utama 2023 BBTUD 20
UP GRESIK Husky-CNOOC Madura Limited 2023 BBTUD 25
UP GRESIK Pertamina Gas Negara JTB 2023 BBTUD 100
UP ARUN PT. PERTA ARUN GAS 2015 - 2029 BBTUD
126
UPDK BELAWAN PT. PERTA ARUN GAS 2015 - 2029 BBTUD
UPDK PEKANBARU EMP BENTU LIMITED & 2021- 2026 BBTUD 40
UPDK PEKANBARU KORINCI BARU LIMITED 2021- 2026 BBTUD 2.5
UPDK PEKANBARU PHE JAMBI MERANG 2022 - 2026 BBTUD 5
UPDK PEKANBARU MEDCO ENERGI CONOCO PHILLIPS 2022 - 2024 BBTUD 3
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/154 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

Pada tanggal 30 Juni 2023, Grup memiliki perikatan As at June 30, 2023, the Group has significant
penting dan kontinjensi sebagai berikut: (lanjutan) commitments and contingencies, as follows:
(continued)

a. Perjanjian pengadaan bahan bakar (lanjutan) a. Fuel supply agreements (continued)

Gas (lanjutan) Gas (continued)

Sektor/ Pemasok/ Periode/ Satuan/ Kuantitas/


Sector Supplier Period Unit Quantity

Wilayah Kalimantan Medco Bangkanai 2013 - 2033 (Exp PSC) BBTUD 20


Wilayah Kalimantan Medco Tarakan 2022 - 2025 BBTUD 3
Wilayah Kalimantan Pertamina EP Bunyu 2023 BBTUD 6.3
Wilayah Kalimantan Pertamina EP Sembakung 2023 BBTUD 2

PLN BATAM
Multidestinasi PGN 2019-2028 BBTUD 61.4

Sehubungan dengan perjanjian diatas, In relation with the above agreements, the
Perusahaan mempunyai fasilitas stand-by letter Company has stand-by letter of credit facilities
of credit dengan rincian sebagai berikut: with the following details:
Bank penerbit/ Penerima manfaat/ Mata uang/ Jumlah/
Issuing Bank Beneficiary Currency Total *)

BRI Ophir Indonesia (Sampang) Pty. USD 18,424,250


PT Pertamina USD 30,038,217
PGN USD 20,700
PT Transportasi Gas Indonesia USD 24,119,520
Kangean Energy Indonesia USD 10,495,869
PT Petrochina Internasional Jabung, Ltd. USD 5,040,000

Bank Mandiri BP Berau Ltd. USD 110,283,250

BNI Malamoi Olom Wobok USD 4,104,000


PT Petrogas Jatim Utama IDR 103,293,225,000
Medco E&P Grissik Ltd. USD 9,300,000
Pertamina, ENI Sepinggan-Neptune, & PHE USD 78,069,600

*) dalam jumlah penuh *) in full amount


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/155 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

a. Perjanjian pengadaan bahan bakar (lanjutan) a. Fuel supply agreements (continued)

Batubara Coal

Volume kontrak
tahunan/ Annual
Pemasok/Suppliers Periode/Period
contract Volume
(dalam/ in metric ton )*)

PLN HOLDING

PT MULTI HARAPAN UTAMA 600,000 2021-2027


PT KALTIM PRIMA COAL 500,000 2021-2027
PT KALTIM PRIMA COAL 500,000 2021-2027
PT KALTIM PRIMA COAL 800,000 2023-2024
PT INDOMINCO MANDIRI 500,000 2022-2024
PT BHARINTO EKATAMA 1,000,000 2023
PT MAHAKAM SUMBER JAYA 1,000,000 2023
PT BUKIT BAIDURI ENERGI 200,000 2023
PT KALTIM PRIMA COAL 2000000 2023-2024
PT INDOMINCO MANDIRI 500,000 2019-2024

PIP
Kons. PT. Arutmin Indonesia dan PT. Darma Henwa 5,023,000 2007 - 2027
Kons. PT. Arutmin Indonesia dan PT. Darma Henwa 350,000 2007 - 2027
Kons. PT. Arutmin Indonesia dan PT. Darma Henwa 2,005,000 2008 - 2027
Kons. PT Oktasan Baruna Persada & PT Buana Rizki Armia 215,000 2012 - 2031
Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara 215,000 2012 - 2032
PT. Titan Infra Energy 2,920,000 2007 - 2027
PT Bukit Asam 18,000,000 2012 - 2032
PT Dizamatra Powerindo 500,000 2016-2021-2025
CV Tahiti Coal 120,000 2017-2019-terpenuhi 360.000
PT Cahaya Bumi Perdana 25,000 2019-2022-2025
CV Bara Mitra Kencana 60,000 2019-2022-2025
CV Putri Surya Pratama Natural 30,000 2019-2022-2025
PT Dasrat Sarana Arang Sejati 48,000 2019-2022-2025
PT Allied Indo Coal Jaya 120,000 2019-2022-2025
Kons. PT Global Energi Lestari dan PT Tempirai Energy Resources 100,000 2022 - 2027
Kons. PT Global Energi Lestari, PT Era Perkasa Mining dan PT Quasar Inti Nusantara 1,855,000 2022 - 2027
PT Amanah Batu Alam Pesada 330,000 2022 - 2027
PT Binuang Mitra Bersama Blok Dua 600,000 2022 - 2027
PT Binuang Mitra Bersama Blok Dua 100,000 2022 - 2027
PT Sarolangun Prima Coal 300,000 2022 - 2027
Konsorsium PT Exploitasi Energi Indonesia dan PT Borneo Indobara 1,350,000 2022 - 2027
PT Alamjaya Bara Pratama 900,000 2022 - 2027
Kons. PT Trungtum Bebatuan Cemerlang, PT Batu Hitam Jaya, PT Bumi Bara
Makmur Mandiri, PT Khatulistiwa Makmur Persada, PT Anugrah Mining 286,000 2022 - 2027
Persada dan PT Kurnia Alam Investama
Kons. PT Mivagio Coal Indonesia dan PT Nusa Alam Lestari 36,000 2022 - 2027
PT Mitra Setia Tanah Bumbu 120,000 2022 - 2027
Kons. PT Rizki Anugrah Pratama, PT Kasongan Mining Mills, PT Hutamas
920,000 2022 -2027
Koado, PT Marga Perkasa, PT Arini dan CV Hirzan Raya
PT Energi Batubara Lestari 300,000 2022 - 2024
PT Bukit Asam 5,000,000 2013 - 2025
PT Berau Coal 1,446,000 2025
PT Adaro Indonesia 1,500,000 2014 - 2023
PT Artha Daya Coalindo 2,100,000 2017 - 2027
PT Oktasan Baruna Persada 2,100,000 2018 - 2026
PT Multi Harapan Utama 1,250,000 2026 ,

*) Dalam jumlah penuh/In full amount


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/156 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

a. Perjanjian pengadaan bahan bakar (lanjutan) a. Fuel supply agreements (continued)

Batubara Coal

Volume kontrak
tahunan/ Annual
Pemasok/Suppliers Periode/Period
contract Volume
(dalam/ in metric ton )*)

PIP

PT Singlurus Pratama 400,000 2023


PT Antang Gunung Meratus 220,000 2022 - 2023
PT Batara Batari Sinergy Nusantara 406,800 2022 - 2023
PT Belgi Energy 260,000 2022 - 2023
PT Buana Perkasa Sukses 350,000 2022 - 2023
PT Budi Gema Gempita 700,000 2022 - 2023
PT Jambi Prima Coal 225,000 2022 - 2023
PT Kasih Coal Resources 322,500 2022 - 2023
PT Semesta Andalan Energi 230,000 2022 - 2023
PT Sinarbaru Wijayaperkasa 200,000 2022 - 2023
PT Singlurus Pratama 632,000 2022 - 2023
PT Sumber Panca Energi 590,000 2022 - 2023
PT Surya Sakti Darma Kencana 85,000 2022 - 2023
PT Tiga Daya Energi 145,000 2022 - 2023
PT Timorra Jaya Perdana 73,000 2022 - 2023
PT Baramulti Suksessarana 285,000 2022 - 2023
PT Artha Daya Coalindo 300,000 2021 - 2022
PT Sarolangun Prima Coal 402,500 2021 atau terpenuhi
Kons. PT Sumber Wahana Putra dan PT Anugrah Mining Persada 157,500 2022 - 2023 (terpenuhi)
PT Anugerah Rahayu Adiperkasa 25,500 2022 atau terpenuhi
PT Batubara Global Energi 7,100 2022 atau terpenuhi
PT Mitrajaya Abadi Bersama 140,000 2023
PT Fontana Resouces Indonesia 132,500 2023
PT Multi Harapan Utama 100,000 2022 - terpenuhi
Kons. PT Komunitas Bangun Bersama dan PT Gamma Utama Sejati 300,000 2022 - terpenuhi
PT Insani Bara Perkasa 475,000 2023
Konsorsium PT Asas Empat Saudara dan PT Era Energi Mandiri 65,000 2023 - terpenuhi
Konsorsium PT Asas Empat Saudara dan PT Batubara Lahat 15,000 2022 - terpenuhi
PT Firman Ketaun 30,000 2023 - terpenuhi
Konsorsium PT Global Energi Lestari dan PT Minimex Indonesia 30,000 2022 - terpenuhi
PT PLN Batubara Niaga (Penugasan PT Baratabang) 1,015,000 2023
PT PLN Batubara Niaga (Penugasan PT Welarco Subur Jaya) 717,800 2023
PT Injatama 45,000 2023
Kons. PLNBBN & AIJG 1,979,000 2023
PT Artha Daya Coalindo 300,000 2021 - 2022/ terpenuhi)
PT Asas Empat Saudara 225,000 2021 - 2022/ terpenuhi)

*) Dalam jumlah penuh/In full amount


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/157 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

a. Perjanjian pengadaan bahan bakar (lanjutan) a. Fuel supply agreements (continued)

Batubara Coal

Volume kontrak tahunan/


Pemasok/Suppliers Annual contract Volume Periode/Period
(dalam/ in metric ton )*)

PIP

PT Anugerah Bintang Gemerlang 150,000 2021 - 2022/ terpenuhi)


PT Inti Garda Nusantara 225,000 2021 - terpenuhi
PT Sulfindo Anugerah Sejahtera 15,000 2022 - terpenuhi
PT Bara Manunggal Sakti 90,000 2022 - terpenuhi
PT Bara Selaras Resources 60,000 2022 - terpenuhi
Kons. PT PLNBB Niaga dan PT Tawabu Mineral Resource 120,000 2022 - terpenuhi
PT Trisensa Mineral Utama 130,000 2022 - terpenuhi

PNP

Kons. PT. Arutmin Indonesia dan PT. Darma Henwa 830,000 2007 - 2027
Kons. PT. Arutmin Indonesia dan PT. Darma Henwa 950,000 2007 - 2027
Kons. PT. Arutmin Indonesia dan PT. Darma Henwa 950,000 2007 - 2027
Kons. PT. Arutmin Indonesia dan PT. Darma Henwa 1,260,000 2007 - 2027
Kons. PT. Arutmin Indonesia dan PT. Darma Henwa 2,005,000 2008 - 2027
Kons. PT Oktasan Baruna Persada & PT Buana Rizki Armia 265,000 2009 - 2028
Kons. PT Oktasan Baruna Persada & PT Buana Rizki Armia 65,000 2009 - 2028
Kons. PT Oktasan Baruna Persada & PT Buana Rizki Armia 84,000 2009 - 2028
Kons. PT Oktasan Baruna Persada & PT Buana Rizki Armia 112,000 2009 - 2028
Kons. PT Oktasan Baruna Persada & PT Buana Rizki Armia 270,000 2012 - 2032
Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara 265,000 2009 - 2029
Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara 65,000 2009 - 2029
Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara 56,000 2009 - 2029
Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara 56,000 2009 - 2029
Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara 475,000 2012 - 2032
Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara 270,000 2012 - 2032
Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara 285,000 2012 - 2032
PT Hanson Energy 640,000 2011 - 2031
PT. Titan Infra Energy 950,000 2007 - 2027
PT Bukit Asam 1,000,000 2014 - 2023
PT Bukit Asam 700,000 2004 - 2031
PT Bukit Asam 18,000,000 2012 - 2032
PT Lanna Harita Indonesia 300,000 2015 - 2025
PT Tunas Inti Abadi 600,000 2015 - 2025
PT Dizamatra Powerindo 500,000 2016 - 2025
PT Samantaka 500,000 21 Nov 2016-2022-2027
PT Bara Energi Lestari 500,000 2017 sd terpenuhi 1.000.000
PT Indexim Coalindo 300,000 2018 - 2023
Kons. PT Global Energi Lestari dan PT Tempirai Energy Resources 175,000 2022 - 2027
Kons. PT Global Energi Lestari, PT Era Perkasa Mining dan PT
360,000 2022 - 2027
Quasar Inti Nusantara
Kons. PT Inti Garda Nusantara dan CV Intan Karya Mandiri 90,000 2022 - 2023
Kons. PT Inti Garda Nusantara dan CV Intan Karya Mandiri 90,000 2022 - 2023
Kons. PT Pancaran Surya Abadi dan PT Bunarus Laju Sejahtera 90,000 2022 - 2025
Kons. PT Pancaran Surya Abadi dan PT Bunarus Laju Sejahtera 90,000 2022 - 2025
Kons. PT Rekamitra Cipta Tambang dan CV Cinta Puri Pratama 150,000 2022 - 2025
Kons. PT Rekamitra Cipta Tambang dan CV Cinta Puri Pratama 150,000 2022 - 2025
PT Ade Putra Tanrajeng 100,000 2022 - 2027
PT Berkat Murah Rejeki 185,000 2022 - 2024
PT Bhumi Rantau Energi 250,000 2022 - 2024
PT Binuang Mitra Bersama Blok Dua 200,000 2022 - 2027
PT Binuang Mitra Bersama Blok Dua 300,000 2022 - 2027
PT Binuang Mitra Bersama Blok Dua 600,000 2022 - 2027
Konsorsium PT Exploitasi Energi Indonesia dan PT Borneo Indobara 300,000 2022 - 2027
Konsorsium PT Exploitasi Energi Indonesia dan PT Borneo Indobara 200,000 2022 - 2027
Konsorsium PT Exploitasi Energi Indonesia dan PT Borneo Indobara 150,000 2022 - 2027
PT Alamjaya Bara Pratama 900,000 2022 - 2027
PT Mitra Setia Tanah Bumbu 120,000 2022 - 2023

*) Dalam jumlah penuh/In full amount


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/158 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

a. Perjanjian pengadaan bahan bakar (lanjutan) a. Fuel supply agreements (continued)

Batubara Coal

Volume kontrak
tahunan/ Annual
Pemasok/Suppliers Periode/Period
contract Volume
(dalam/ in metric ton )*)

PNP
Kons. PT Rizki Anugrah Pratama, PT Kasongan Mining Mills, PT Hutamas
180,000 2022 - 2027
Koado, PT Marga Perkasa, PT Arini dan CV Hirzan Raya
Kons. PT Rizki Anugrah Pratama, PT Kasongan Mining Mills, PT Hutamas
90,000 2022 - 2027
Koado, PT Marga Perkasa, PT Arini dan CV Hirzan Raya
Kons. PT Rizki Anugrah Pratama, PT Kasongan Mining Mills, PT Hutamas
60,000 2022 - 2027
Koado, PT Marga Perkasa, PT Arini dan CV Hirzan Raya
Kons. PT Rizki Anugrah Pratama, PT Kasongan Mining Mills, PT Hutamas
60,000 2022 - 2027
Koado, PT Marga Perkasa, PT Arini dan CV Hirzan Raya
Konsorsium PT Batubara Global Energi dan PT Ganda Alam Makmur 300,000 2022 - 2023
PT Kaltim Prima Coal 1,800,000-3,200,0002018 - 2021 / sampai volume terpenuhi
PT Arutmin Indonesia 1,440,000 - 2,400,0002018 - 2021 / sampai volume terpenuhi
PT PLN Batubara Alokasi 2022 (240.000) 2020-2040
PT Antang Gunung Meratus 220,000 2022 - 2023
PT Belgi Energy 260,000 2022 - 2023
PT Angsana Jaya Energi, PT Buana Perkasa Sukses 180,000 2022 - 2023
PT Bumi Berdikari Sentosa, PT Energi sinar bara 2022 - 2024
730,000
PT Energi sinar bara 2022 - 2023
PT Falutra Mitra Bersama 570,000 2022 - 2023
PT Jambi Prima Coal 225,000 2022 - 2023
PT Kasih Coal Resources 322,500 2022 - 2023
PT Semesta Andalan Energi 230,000 2022 - 2023
PT Sinarbaru Wijayaperkasa 200,000 2022 - 2023
PT Singlurus Pratama 632,000 2022 - 2023
PT Sumber Panca Energi 590,000 2022 - 2023
PT Surya Sakti Darma Kencana 85,000 2022 - 2023
PT Tiga Daya Energi 145,000 2022 - 2023
PT Timorra Jaya Perdana 2022 - 2023
73,000
PT Usaha Maju Makmur 2022 - 2023
PT Baramulti Suksessarana 285,000 2022 - 2023
PT Baratabang 1,030,000 2022 - terpenuhi
PT Rekamita Cipta Tambang 110,000 2022 - terpenuhi
PT Mitrabara Adiperdana 60,000 2022 - terpenuhi
PT Pada Idi 15,000 2022 - terpenuhi
PT Usaha Baratama Jesindo 150,000 2022 - terpenuhi
PT Jaya Energi Adiperkasa 330,000 2022 - terpenuhi

*) Dalam jumlah penuh/In full amount


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/159 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

a. Perjanjian pengadaan bahan bakar (lanjutan) a. Fuel supply agreements (continued)

Batubara Coal

Volume kontrak
tahunan/ Annual
Pemasok/Suppliers Periode/Period
contract Volume (dalam/
in metric ton )*)

PNP

PT Global Energi Lestari 2022 - terpenuhi


PT Bahterra Adhiguna 2022 - terpenuhi
PT Djakarta Lloyd 250,000 2022 - terpenuhi
PT Mathesis Global Mineral 2021/ terpenuhi
PT Inti Garda Nusantara 2021/ terpenuhi
PT Kunz Primera Pratama 93,100 2021/ terpenuhi
PT Bentan Energi Sakti 37,500 2021/ terpenuhi
PT Bumi Pertiwi Energy 2023
60,000
PT Grand Apple Indonesia 2022 - Terpenuhi
PT Bartim Bara Prima 30,000 2022 - Terpenuhi
PT Batubara Indonesia Jaya 67,500 2022 - Terpenuhi
PT Riau Mitra Bina Energi 110,000 2022 - Terpenuhi
PT Anugerah Borneo Sinergy 18,500 2022 - Terpenuhi
PT Mandiri Inti Perkasa 2022 - Terpenuhi
1,130,000
PT Welarco Subur Jaya 2022 - Terpenuhi
Konsorsium KUD Karya Murni dan PT IGN 120,000 2022 - Terpenuhi
Konsorsium KUD Karya Murni dan PT IGN 2022 - Terpenuhi
Kons. PT Komunitas Bangun Bersama dan PT Gamma Utama Sejati 2022 - Terpenuhi
120,000
PT Insani Bara Perkasa 2023
PT PLN Batubara Niaga (Penugasan PT Muara Alam Sejahtera) 2022 - terpenuhi
Kons. PT Bima Putra Abadi Citranusa dan PT Asas Empat Saudara 155,000 2023 - terpenuhi
PT Asta Maharanita 15,000 2022 - Terpenuhi
Konsorsium PT Asas Empat Saudara dan PT Bumi Merapi Energi 15,000 2022 - Terpenuhi
PT Dinar Kalimantan Coal 30,000 2022 - Terpenuhi
PT Energi Batubara Lestari 100,000 2023
Konsorsium PT Antang Gunung Meratus dan PT PLN BB Niaga 820,000 2023
PT PLN Batubara Niaga (Penugasan PT Baratabang) 1,015,000 2023
PT PLN Batubara Niaga (Penugasan PT Welarco Subur Jaya) 717,800 2023
PT PLN Batubara Niaga (Penugasan PT Bara Alam Utama) 7,500 2022 - Terpenuhi
Kons Virema Impex dan PT Bintang Prima Energi Pratama 11,000 2022 - Terpenuhi
PT Bangun Sumber Berkat 30,000 2022 - Terpenuhi
PT Mandiri Unggul Sejati 22,500 2022 - Terpenuhi
PT Virema Impex 11,000 2022 - Terpenuhi
PLN BATAM
PT Kideco Jaya Agung 380,000 2007-2027
*) Dalam jumlah penuh/In full amount
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/160 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

a. Perjanjian pengadaan bahan bakar (lanjutan) a. Fuel supply agreements (continued)

Batubara (lanjutan) Coal (continued)

Pada tanggal 9 Maret 2018, Kementerian On March 9, 2018, the Ministry of Energy and
ESDM menerbitkan surat keputusan No. 1395 Mineral Resources issued Decree
K/30/MEM/2018 mengenai harga jual batubara No. 1395 K/30/MEM/2018 regarding the coal
untuk penyediaan tenaga listrik untuk selling price for electricity supply for the public
kepentingan umum yang berlaku surut sejak 1 interest which was retroactively valid from
Januari 2018. Sesuai surat keputusan tersebut, January 1, 2018. According to the decree, the
harga batubara ditetapkan sebesar maksimal coal price was regulated at a maximum price of
USD70/metrik ton dengan acuan pada kalori USD70/metric ton referenced to coal at 6,322
6.322 kcal/kg. Surat keputusan tersebut juga kcal/kg. The decree also regulated the formula to
mengatur formula untuk menghitung harga calculate the price for different specifications of
dengan spesifikasi yang berbeda seperti yang coal as listed in the decree. On December 26,
tercantum dalam keputusan tersebut. Pada 2019, the Ministry of Energy and Mineral
tanggal 26 Desember 2019, Kementerian Resources issued Decree No.
ESDM menerbitkan Surat Keputusan No. 261 261K/30/MEM/2019 regarding the fulfillment of
K/30/MEM/2019 mengenai pemenuhan domestic coal needs in 2020 which was effective
kebutuhan batubara dalam negeri tahun 2020 on January 1, 2020. This decree revokes the
yang mulai berlaku pada tanggal 1 Januari Decree of the Minister of Energy and Mineral
2020. Surat keputusan ini mencabut Keputusan Resources No. 1395K/30/MEM/2018 regarding
Menteri ESDM No. 1395 K/30/MEM/2018 the selling price of coal for the supply of electricity
mengenai harga jual batubara untuk for public purposes.
penyediaan tenaga listrik untuk kepentingan
umum.

Pada tanggal 2 November 2020, Menteri On November 2, 2020, the Minister of Law and
Hukum dan Hak Asasi Manusia mengeluarkan Human Rights issued Law No. 11 year 2020 on
Undang-Undang No. 11 Tahun 2020 tentang Job Creation. The main point of the law relating to
Cipta Kerja. Poin utama peraturan tersebut the Group relates to the inclusion of coal mining
yang berkaitan dengan Grup adalah hasil products in the types of goods subject to VAT,
pertambangan batubara termasuk dalam jenis and therefore all purchases of coal are subject to
barang yang dikenai PPN, maka seluruh VAT at 10%. In accordance with the HPP Law
pembelian batubara dikenakan PPN terhitung which was approved on October 29, 2021, the
mulai tanggal tersebut dengan tarif 10%. Sesuai VAT rate that will be applied as at April 1, 2022 is
dengan UU HPP yang telah disahkan pada 11%.
tanggal 29 Oktober 2021, tarif PPN yang akan
berlaku per tanggal 1 April 2022 adalah sebesar
11%.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/161 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

a. Perjanjian pengadaan bahan bakar (lanjutan) a. Fuel supply agreements (continued)

Bahan bakar minyak Fuel

Perusahaan dan Pertamina mengadakan The Company and Pertamina entered into a Fuel
Perjanjian Induk Jual Beli Bahan Bakar Minyak Sale and Purchase Agreement No.
No. 071.PJ/060/DIR/2001 tanggal 8 Oktober 071.PJ/060/DIR/2001 dated October 8, 2001.
2001. Perjanjian ini telah di addendum tanggal This agreement was amended on May 16, 2007,
16 Mei 2007 dimana Perusahaan dan whereby, the Company and Pertamina agreed
Pertamina menyepakati antara lain: (i) among other things: (i) that the monthly fuel price
penggunaan harga bahan bakar bulanan to be used for the period January 1 until April 30,
ditetapkan oleh Pertamina untuk periode 1 2007 is determined by Pertamina and the fuel
Januari sampai dengan 30 April 2007 dan harga price of 109.5% from Mean Oil Platts Singapore
bahan bakar 109,5% dari Mean Oil Platts (“MOPS”) plus VAT for the period May 1, 2007
Singapore (“MOPS”) ditambah Pajak until December 31, 2007; (ii) that the fuel price
Pertambahan Nilai untuk periode 1 Mei 2007 subsequent to December 31, 2007 will be
sampai dengan 31 Desember 2007; (ii) harga determined by both parties every year; (iii) that
bahan bakar setelah tanggal 31 Desember the terms of payment and penalty charges on late
2007 akan ditetapkan oleh kedua belah pihak payment use a monthly rate of Certificate of Bank
setiap tahun; (iii) jangka waktu pembayaran Indonesia plus 1.3%; (iv) that effective on May 1,
berikut pengenaan denda keterlambatan 2007, the unpaid balance of payable for the
pembayaran sebesar tingkat bunga Sertifikat purchases of fuel until April 30, 2007 will bear
Bank Indonesia bulanan ditambah 1,3%; (iv) interest with a rate per annum of Certificate of
efektif mulai 1 Mei 2007, saldo utang yang Bank Indonesia plus 1.3%, until settled by
belum dibayar atas pembelian bahan bakar issuance of PLN bonds, which is no later than
sampai dengan 30 April 2007 dikenakan bunga August 31, 2007; (v) that the maximum payable to
sebesar tingkat bunga Sertifikat Bank Indonesia Pertamina, including bonds which will be issued
per tahun ditambah 1,3%, sampai diselesaikan amounted to Rp18 trillion; and (vi) that this
dengan menerbitkan obligasi PLN selambat- agreement is valid for five years from January 1,
lambatnya tanggal 31 Agustus 2007; (v) utang 2007 until December 31, 2011.
kepada Pertamina, termasuk obligasi yang akan
diterbitkan maksimum sebesar Rp18 triliun; dan
(vi) perjanjian ini berlaku untuk lima tahun sejak
1 Januari 2007 sampai dengan 31 Desember
2011.

Berdasarkan Surat Kesepakatan Bersama Based on the Joint Deal Letter dated May 16,
tanggal 16 Mei 2007, PT Sucofindo (Persero) 2007, PT Sucofindo (Persero) is assigned as an
ditunjuk sebagai surveyor independen. independent surveyor.

Berdasarkan Addendum IV Perjanjian Jual Beli Based on Amendment IV of the Fuel Sale and
Bahan Bakar Minyak tanggal 16 Mei 2017, PLN Purchase Agreement dated May 16, 2017, PLN
dan Pertamina menyepakati perpanjangan and Pertamina agreed to extend the period of
jangka waktu pasokan hingga tahun 2020. supply until 2020.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/162 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

a. Perjanjian pengadaan bahan bakar (lanjutan) a. Fuel supply agreements (continued)

Bahan bakar minyak (lanjutan) Fuel (continued)

Atas perjanjian ini sudah diamandemen This agreement has been amended based on
berdasarkan Addendum VII tanggal 3 Juni Addendum VII dated June 3, 2021, in which PLN
2021, PLN dan Pertamina menyepakati adanya and Pertamina agreed on a price review and to
reviu harga dan perpanjangan jangka waktu extend the supply period until 2023.
pasokan hingga tahun 2023.

Berdasarkan Addendum VIII tertanggal 17 Based on Addendum VIII dated December 17,
Desember 2021, kesepakatan harga jual beli 2021, the agreement on the sale and purchase
bahan bakar minyak (HSD dan MFO) sejak price of fuel oil (HSD and MFO) from January 1,
tanggal 1 Januari 2021 sampai dengan 31 2021 to December 31, 2023 between Pertamina
Desember 2023 antara Pertamina dan and the Company is as follows:
Perusahaan adalah sebagai berikut:

a. Selama masa negosiasi, formula harga baru a. During the negotiation period, the new price
untuk periode tanggal 1 Januari 2021 formula for the period of January 1, 2021 to
sampai dengan 31 Desember 2021, December 31, 2021, uses the provisional price
menggunakan formula harga sementara formula agreed in the amendment for the
yang telah disepakati pada addendum untuk period of January 1, 2018 to December 31,
periode 1 Januari 2018 sampai dengan 31 2020.
Desember 2020.
b. Sehubungan dengan hal tersebut, formula b. Based on the above situation, a new price
harga baru akan disepakati untuk periode formula will be agreed for the period starting
terhitung mulai tanggal 1 Januari 2022 from January 1, 2022 to December 31, 2023.
sampai dengan 31 Desember 2023.

Uap panas bumi Geothermal steam

Pada tanggal 30 Juni 2023 dan 31 Desember As at June 30, 2023 and December 31, 2022, the
2022, Grup memiliki perjanjian dengan Group entered into geothermal steam purchase
beberapa pemasok untuk pengadaan uap agreements with several suppliers as follows:
panas bumi sebagai berikut:
Periode/
Sektor/Sector Pemasok/Supplier Period

Kamojang Unit 1, 2 & 3 PGE 2012 - 2040


Lahendong Unit 1 PGE 2002 - 2032
Lahendong Unit 2 & 3 PGE 2007 - 2039
Lahendong Unit 4 PGE 2011 - 2041
Ulubelu Unit 1 & 2 PGE 2012 - 2042
Hululais Unit 1 & 2 PGE 30 tahun/years*)
Sungai Penuh Unit 1 & 2 PGE 30 tahun/years*)
Kotamobagu Unit 1,2,3 & 4 PGE 30 tahun/years*)
Darajat Unit 1 PGE, Star Energy Geothermal Darajat I 1994 - 2030
Ltd., Star Energy, Geothermal Darajat II Ltd.
Gunung Salak Unit 1,2 & 3 PGE, Star Energy Geothermal Salak Ltd.,
Ltd., Star Energy Geothermal Salak Pratama Ltd. 1993 - 2040
*) Sejak Commercial Date/Since Commercial Date
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/163 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

b. Perjanjian jual beli tenaga listrik dan kontrak b. Power purchase agreements and energy sales
penjualan energi contracts

Sebelum tahun 1997, Perusahaan mengadakan Prior to 1997, the Company entered into PPAs
PPA dan ESC dengan IPP skala besar. Pada and ESCs with large-scale IPPs. In 1999, the
tahun 1999, Perusahaan telah melaksanakan Company entered into renegotiation of the PPAs
renegosiasi terhadap PPA dan ESC melalui and ESCs through a Working Group on PT PLN
Kelompok Kerja Renegosiasi Kontrak Khusus (Persero) Special Contract Renegotiation under
PT PLN (Persero) di bawah arahan Pemerintah. the direction of the Government. Such
Renegosiasi tersebut meliputi antara lain renegotiation includes, among other subjects,
keseimbangan kondisi kontrak, kewajaran equalisation in contract conditions,
harga dan disparitas harga jual listrik IPP dan reasonableness of price and disparity of selling
harga jual Perusahaan. price between the IPPs and the Company.

Dalam perjanjian dengan IPP tertentu, Based on the agreements with certain IPPs, the
disepakati bahwa setiap saat selama perjanjian Group may exercise its option to purchase all of
berlaku, Grup dapat melaksanakan opsi untuk the IPP’s rights, title and interest in the projects at
membeli hak penjual, milik, dan kepentingan any time during the contract period.
atas proyek yang bersangkutan.

Pada tanggal 30 Juni 2023, perjanjian signifikan As at June 30, 2023, the significant agreements
antara Grup dengan IPP adalah sebagai between the Group with IPPs are as follows:
berikut:

Sudah beroperasi In operation

Tanggal Operasi
Kapasitas/ Komersial/
Proyek Capacity Periode/ Commercial Operation
Perusahaan/ Company Proyek/ Project (MW) Afb (%) Period Date

PLN HOLDING

PT Shenhua Guohua Pembangkitan Jawa Bali PLTU Jawa-7 (2 x 1000 MW) 2,000 86% 2021 - 2046 8-Jul-21
PT Bhumi Jati Power PLTU Jawa-4 (FTP2) (2 x 1000 MW) 2,000 86% 2022 - 2047 17 March 2022
PT Bhimasena Power Indonesia PLTU Jawa Tengah 1,900 86% 2022 - 2047 31 Aug 2022
PT Paiton Energy PLTU Paiton-1 (2 x 615 MW) 1,230 85% 2001 - 2041 1 Jan 2001
PT Jawa Power PLTU Paiton-2 (2 x 610 MW) 1,220 83% 2000 - 2030 1 November 2020
PT Sumber Segara Primadaya PLTU Jawa-8 (1 x 945 MW) 945 80% 2019 - 2049 9 November 2019
PT Cirebon Energy Prasarana PLTU JAWA 1 / Cirebon Exp 924 86% 2023 - 2048 19 Mei 2023
PT Paiton Energy PLTU Paiton-3 (1 x 815 MW) 815 85% 2012 - 2042 18 March 2012
PT Cirebon Electric Power PLTU Cirebon (1 x 660 MW) 660 80% 2012 - 2042 27 July 2012
PT Lestari Banten Energi PLTU Banten (1 x 625 MW) 625 80% 2017 - 2042 28-Mar-17
PT Sumber Segara Primadaya PLTU Cilacap Ekspansi (1 x 614 MW) 614 80% 2016 - 2046 10 June 2016
PT Sumber Segara Primadaya PLTU Cilacap (2 x 281 MW) 562 80% 2007 - 2037 1 February 2007
PT General Energy Bali PLTU Celukan Bawang (2 x 125 MW dan 1 x 130 MW)
380 85% 2015 - 2045 23-Sep-15
PT DSSP Power Sumsel PLTU MT Sumsel-5 (2 x 150 MW) 300 80% 2016 - 2041 20 December 2016
PT Medco Ratch Power Riau PLTGU Riau (275 MW) 275 60% 2022 - 2042 10 February 2022
PT Bosowa Energi PLTU Jeneponto (2 x 125 MW) 250 80% 2018 - 2048 1-Apr-18
PT Priamanaya Energi PLTU MT Keban Agung (2 x 120 MW) 240 80% 2016 - 2046 1 May 2016
PT GH EMM Indonesia PLTU MT Simpang Belimbing (2 x 113,5 MW) 227 80% 2013 - 2043 27 February 2013
Star Energy Geothermal Ltd PLTP Wayang Windu Unit 1&2 227 95% 2000 - 2030 1 June 2000
PT Bukit Pembangkit Innovative PLTU MT Banjarsari (2 x 110 MW) 220 80% 2015 - 2045 30 June 2015
PT GCL Indo Tenaga PLTU Kalbar-1 (2 x 100 MW) 200 80% 2021 - 2046 25-Jun-21
PT Tenaga Listrik Bengkulu PLTU Bengkulu (2 x 100 MW) 200 80% 2020 - 2045 27-Jul-20
PT SKS Listrik Kalimantan PLTU Kalteng-1 / Kalselteng-1 (2 x 100 MW) 200 80% 2020 - 2045 4-Nov-20
PT Indonesia Energi Dinamika PLTU Kaltim-4 (2 x 100 MW) 200 80% 2020 - 2045 14 April 2020
PLTU Kaltim-2 (FTP2) (2 x 100
PT Graha Power Kaltim 200 80% 2020 - 2045 31 March 2020
MW)
PT Bosowa Energi PLTU Jeneponto (2 x 100 MW) 200 80% 2012 - 2042 31 October 2012
PT Tanjung Power Indonesia PLTU Kalsel-1 (FTP2) (2 x 100 MW) 200 80% 2019 - 2044 14-Dec-19
Pertamina dan Star Energy Geothermal Ltd PLTP Darajat Unit 2&3 220 80% 2000 - 2030 1-Feb-00
Star Energy Geothermal Ltd PLTP Salak Unit 4-6 197 90% 2000 - 2040 1 December 2000
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/164 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

b. Perjanjian jual beli tenaga listrik dan kontrak b. Power purchase agreements and energy sales
penjualan energi (lanjutan) contracts (continued)

Sudah beroperasi (lanjutan) In operation (continued)

Tanggal Operasi
Kapasitas/ Komersial/
Proyek Capacity Periode/ Commercial Operation
Perusahaan/ Company Proyek/ Project (MW) Afb (%) Period Date

PLN HOLDING

PT Poso Energy PLTA Poso 515 845.52 GWh/th 2012 - 2042 30 December 2012
PT Bajradaya Sentranusa PLTA Asahan 180 1.175 GWh/th 2011 - 2041 18 January 2011
PT Cikarang Listrindo PLTGU Cikarang Ekspansi (150 MW) 150 72% 2011 - 2031 1 June 2011
PT Asrigita Prasarana PLTGU Palembang Timur (150 MW) 150 85% 2005 - 2025 16 December 2005
PT Bekasi Power PLTGU Bekasi Power 119 90% 2013 - 2033 5 January 2013
PT Kertanegara Energi Perkasa PLTGU Senipah (117 MW) 117 85% 2015 - 2040 17 March 2015
Sarulla Operation Ltd PLTP Sarulla 1 Unit 1, 2 220 90% 2017 - 2047 2 October 2017
Sarulla Operation Ltd PLTP Sarulla 1 Unit 3 110 90% 2018 - 2048 3 April 2018
PT Minahasa Cahaya Lestari PLTU Sulut-3 (2 x 50 MW) 100 80% 2021 - 2046 11-Feb-21
PT DSSP Power Kendari PLTU Kendari-3 (2 x 50 MW) 100 80% 2019 - 2044 28 October 2019
PT Gorontalo Listrik Perdana PLTU Sulbagut-1 (2 x 50 MW) 100 80% 2021 - 2046 31-Dec-21
PT Metaepsi Pejebe Power Generation PLTGU Gunung Megang (2 x 40 MW + 30 MW) 110 85% 2007-2027 10 November 2007
PT Malea Energy PLTA Malea 90 474 GWh/th 2021 - 2051 2-Jul-21
PT Supreme Energy Rantau Dedap PLTP Rantau Dedap 86 90% 2021 - 2051 26-Dec-21
PT Supreme Energy Muara Laboh PLTP Muara Laboh 80 90% 2019 - 2049 16 December 2019
Range energi:
PT UPC Sidrap Bayu Energi PLTB Sidrap 70 2018 - 2048 5 April 2018
92.5% - 107.5%
PT Pertamina Geothermal Energy PLTP Kamojang Unit 4 60 90% 2008 - 2038 26 January 2008
Range energi:
PT Energi Bayu Jeneponto PLTB Tolo 60 2019 - 2049 14 May 2019
92.5% - 107.5%
PT Tanggamus Electric Power PLTA Semangka 56 278.97 GWh 2018 - 2048 2 July 2018
PLTU MT Kaltim-1 (2 x 27,5 MW)
PT Indo Ridlatama Power 55 80% 2018 - 2048
Nama lain: PLTU Muara Jawa 1-Dec-18
PT Geo Dipa Energi PLTP Dieng 55 95% 2002 - 2032 11 October 2002

PT Geo Dipa Energi PLTP Patuha 55 95% 2014 - 2054 27 September 2014

PT Pertamina Geothermal Energy PLTP Ulubelu Unit 3 55 90% 2016 - 2046 26 July 2016
PT Pertamina Geothermal Energy PLTP Ulubelu Unit 4 55 90% 2017 - 2047 25 March 2017

PT Pertamina Geothermal Energy PLTP Lumut Balai 55 90% 2019 - 2049 1 September 2019

PT Cahaya Fajar Kaltim PLTU Embalut Ekspansi (1 x 50 MW) 50 87% 2014 - 2039 14 August 2014
PT Lombok Energy Dynamics PLTU Lombok Timur (2 x 25 MW) 50 80% 2017 - 2042 10 April 2017
PT Rekind Daya Mamuju PLTU Mamuju (2 x 25 MW) 50 80% 2018 - 2043 18 September 2018

lainnya 559 Others

PLN BATAM

PT Dalle Energy Batam PLTG Panaran 87 90% 2005-2025 1 December 2005


PT Mitra Energi Batam PLTG Panaran 55 84% 2004-2034 29 October 2004
PT Mitra Energi Batam PLTG Panaran 22 2014-2034 8 September 2014
PT Maxpower Indonesia PLTMG Sewa Panaran II 25 93% 2023 - 2025 2 Juni 2023
PT Tanjung Kasam Power PLTU Tanjung Kasam 110 85% 2012-2021 25 October, 2012
PT Energi Listrik Batam PLTGU Tanjung Uncang, Pulau Batam 70 85% 2016-2036 1 May, 2016
PT Sorik Marapi Geothermal Power Sorik Marapi #3 50 90% 2022 - 2051 Construction stage

Jumlah 21,362 Total


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/165 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

b. Perjanjian jual beli tenaga listrik dan kontrak b. Power purchase agreements and energy sales
penjualan energi (lanjutan) contracts (continued)

Belum beroperasi (dalam tahap pengembangan) Not yet in operation (development stage)

Kapasitas/
Capacity Afb Periode/ Status/
Perusahaan/ Company Proyek/ Project Bahan bakar/ Fuel (MW) (%) Period Status

PLN HOLDING

PT Indo Raya Tenaga PLTU Jawa-9&10 Batubara/Coal 2,000 86% 2024 - 2049 Construction stage
PT Jawa Satu Power PLTGU Jawa-1 LNG 1,760 60% 2023 - 2048 Construction stage
PT Huadian Bukit Asam Power PLTU MT Sumsel-8 Batubara/Coal 1,243 80% 2023 - 2048 Construction stage
PT Huadian Bukit Asam Power PLTU MT Sumsel-1 Batubara/Coal 600 80% 2023 - 2053 Construction stage
PT North Sumatra Hydro Energy PLTA Batang Toru Peaker Tenaga Air/Hydro 510 47% 2026 - 2056 Construction stage
PT Meulaboh Power Generation PLTU Meulaboh 3&4 Batubara/Coal 400 80% 2023 - 2048 Construction stage
PT Kerinci Merangin Hidro PLTA Merangin Tenaga Air/Hydro 350 41% 2025 - 2055 Construction stage
PT Sumbagselenergi Sakti Pewali PLTU MT Sumbagsel-1 Batubara/Coal 300 80% 2024-2049 Construction stage
145 2023 - 2053 Construction stage
PT Pembangkitan Jawa Bali Masdar Solar Energy PLTS Terapung Cirata Surya/Solar 17%

PT Supreme Energy Rantau Dedap Rantau Dedap #2 Panas Bumi/Geothermal 134 90% 2025 - 2055 Exploration
Star Energy Geothermal Wayang Windu Wayang Windu #4 Panas Bumi/Geothermal 120 95% 2028 - 2058 Potential
PT Sejahtera Alam Energy (SAE) Baturaden #1 Panas Bumi/Geothermal 110 90% 2028 - 2058 Exploration
PT Supreme Energy Rajabasa Rajabasa #1 Panas Bumi/Geothermal 110 90% 2025 - 2055 Exploration
PT Supreme Energy Rajabasa Rajabasa #2 Panas Bumi/Geothermal 110 90% 2029 - 2059 Exploration
PT Sintesa Banten Geothermal Rawadano #2 Panas Bumi/Geothermal 80 90% 2025 - 2055 Exploration
PT Sejahtera Alam Energy (SAE) Baturaden #2 Panas Bumi/Geothermal 75 90% 2025 - 2055 Exploration
PT Supreme Energy Muara Laboh (SEML) Muara Laboh #2 Panas Bumi/Geothermal 140 90% 2025 - 2055 Exploration
Bali Energy Limited (BEL) Bedugul #1 Panas Bumi/Geothermal 10 95% 2025 - 2055 Exploration
Bali Energy Limited (BEL) Bedugul #2 Panas Bumi/Geothermal 55 95% 2030 - 2055 Exploration
Star Energy Geothermal Wayang Windu Wayang Windu #3 Panas Bumi/Geothermal 60 80% 2026 - 2056 Exploration
PT Geo Dipa Energi Dieng #2 Panas Bumi/Geothermal 55 90% 2025 - 2055 Construction stage
PT Geo Dipa Energi Dieng #3 Panas Bumi/Geothermal 55 90% 2028 - 2058 Exploration
PT Geo Dipa Energi Dieng #4 Panas Bumi/Geothermal 55 90% 2031 - 2061 Exploration
Pertamina Gheotermal Energy Hululais #1 Panas Bumi/Geothermal 55 85% 2025 - 2055 Financing
Pertamina Gheotermal Energy Hululais #2 Panas Bumi/Geothermal 55 85% 2025 - 2055 Financing
PT Medco Cahaya Gheotermal Ijen #1 Panas Bumi/Geothermal 55 90% 2024 - 2054 Under Construction
PT Medco Cahaya Gheotermal Ijen #2 Panas Bumi/Geothermal 55 90% 2026 - 2056 Under Construction
PT Medco Cahaya Gheotermal Ijen #1 Panas Bumi/Geothermal 55 90% 2024 - 2054 Under Construction
PT Medco Cahaya Gheotermal Ijen #2 Panas Bumi/Geothermal 55 90% 2026 - 2056 Under Construction
PT Pertamina Geothermal Energy Energy Lumut Balai #2 Panas Bumi/Geothermal 55 90% 2024 - 2054 Construction stage
PT Pertamina Geothermal Energy Energy Lumut Balai #3 Panas Bumi/Geothermal 55 90% 2024 - 2054 Potential
PT Pertamina Geothermal Energy Energy Lumut Balai #4 Panas Bumi/Geothermal 55 90% 2024 - 2054 Potential
Tahap akhir eksplorasi
PT Geo Dipa Energi Patuha #2 Panas Bumi/Geothermal 55 75% 2025 - 2055 dan persiapan pengadaan
EPC Pembangkit
PT Geo Dipa Energi Patuha #3 Panas Bumi/Geothermal 55 75% 2028 - 2058 Exploration
PT Geo Dipa Energi Patuha #4 Panas Bumi/Geothermal 55 75% 2029 - 2058 Potential
PT Pertamina Geothermal Energy Sungai Penuh #1 Panas Bumi/Geothermal 55 85% 2028 - 2058 Potential
PT Pertamina Geothermal Energy Sungai Penuh #2 Panas Bumi/Geothermal 55 85% 2028 - 2058 Potential
PT Bakrie Darmakarya Telaga Ngebel #1 Panas Bumi/Geothermal 55 90% 2027 - 2057 Exploration
PT Bakrie Darmakarya Telaga Ngebel #2 Panas Bumi/Geothermal 55 90% 2030 - 2057 Potential
PT Bakrie Darmakarya Telaga Ngebel #3 Panas Bumi/Geothermal 55 90% 2030 - 2057 Potential
PT Sorik Marapi Geothermal Power Sorik Marapi #4 Panas Bumi/Geothermal 50 90% 2022 - 2051 Under Construction
PT Sorik Marapi Geothermal Power Sorik Marapi #5 Panas Bumi/Geothermal 50 90% 2022 - 2051 Exploration
Star Energy Geothermal Salak PLTP Gunung Salak 7 Panas Bumi/Geothermal 55 90% 2025 - 2055 Exploration
Tahap akhir eksplorasi
dan persiapan pengadaan
PT Geo Dipa Energi Patuha #2 Panas Bumi/Geothermal 55 75% 2023 - 2053
EPC Pembangkit

Geo Dipa Energy Dieng #5 Panas Bumi/Geothermal 50 90% 2025 - 2055 Exploration
Geo Dipa Energy Dieng #6 Panas Bumi/Geothermal 50 90% 2025 - 2055 Exploration

Lainnya/others 975 Others


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/166 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

b. Perjanjian jual beli tenaga listrik dan kontrak b. Power purchase agreements and energy sales
penjualan energi (lanjutan) contracts (continued)

Belum beroperasi (dalam tahap pengembangan) Not yet in operation (development stage)
(lanjutan) (continued)

Kapasita
Capacity Afb Periode/ Status/
No Perusahaan/ Company Proyek/ Project Bahan bakar/ (MW) (%) Period Status

PLN BATAM
1 KSO PT Beringin Mas Powerindo - PT PLTMG Sewa KabiI 50MW Gas 50.00 93% 2023 - 2028 Under Construction
VPower Operation Services - PT Supreme
Energi Indonesia

Jumlah 10,747 Total

a) Perjanjian berlaku sejak ditandatangani, dan a) The agreements are effective from the date of
jual beli tenaga listrik berlaku antara 20 signing and buying and selling of electricity is
sampai dengan 30 tahun sejak tanggal valid between 20 to 30 years starting from the
operasi komersial. commercial operation date.
b) AF = Faktor pemasokan tenaga yang harus b) AF = Power supply factor which must be
diserap Perusahaan. absorbed by the Company.
c) Meliputi kontrak dengan IPP, yang terdiri c) Represents contracts with IPPs, consisting of
dari IPP dalam tahap pembangunan dan IPP IPPs under construction and IPPs in the
dalam tahap pembiayaan PPA berlokasi di financing stage, and PPAs which are located
berbagai daerah di Indonesia, menggunakan in several areas of Indonesia which will use
bahan bakar batu bara, panas bumi dan mini coal, geothermal and mini hydro for
hydro dengan kapasitas masing-masing generation with each power plant’s capacity
pembangkit kurang dari 50 MW. less than 50 MW.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/167 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

b. Perjanjian jual beli tenaga listrik dan kontrak b. Power purchase agreements and energy sales
penjualan energi (lanjutan) contract (continued)

Belum beroperasi (dalam tahap Not yet in operation (development stage)


pengembangan) (lanjutan) (continued)

Harga tenaga listrik per kWh untuk The electricity power price per kWh for gas, MFO
pembangkitan bahan bakar gas, MFO dan and coal power plants are determined by certain
batubara ditetapkan berdasarkan formula formulas as stated in the agreement which
tertentu yang ditetapkan dalam perjanjian yang regulates, among other subjects, capital cost
antara lain mengatur pemulihan biaya modal, recovery, fixed operation and maintenance cost
pembayaran biaya tetap operasi dan payment, fuel expense and variable operation
pemeliharaan, biaya bahan bakar dan and maintenance cost payment. For geothermal
pembayaran biaya variabel operasi, dan biaya heat power plants, the electricity power price is
pemeliharaan. Untuk pembangkitan yang determined by a certain formula as stated in the
menggunakan panas bumi, harga tenaga listrik agreement, involving, among other things, Energy
ditetapkan berdasarkan formula tertentu Charge and Capacity Charge.
sebagaimana dinyatakan dalam perjanjian
antara lain Energy Charge dan Capacity
Charge.

Selain dari perjanjian jual beli tenaga listrik di In addition to the above PPAs, the Group also
atas, Grup juga memiliki beberapa perjanjian entered into rental agreements that fall into the
sewa yang termasuk dalam kategori sewa category of operating leases.
operasi.

c. Perolehan barang modal c. Capital expenditures

Pada tanggal 30 Juni 2023 dan 31 Desember As at June 30, 2023 and December 31, 2022,
2022, jumlah ikatan perolehan barang modal total commitments for capital expenditures based
berdasarkan kontrak, terutama sehubungan on contracts, which are related to procurement of
dengan pengadaan pembangkitan, jaringan power plants, transmission and distribution are as
transmisi dan distribusi adalah sebagai berikut: follows:

Jumlah dalam
mata uang asing/
Mata uang/ Amount in Setara Rupiah/
Currencies foreign currencies *) Rupiah equivalent *)

Program percepatan Fast track program


Kontrak pembangkitan USD 34,987,193 524,808 Power plant contracts
Rupiah 1,149,773
1,674,581

Kontrak transmisi Rupiah 91,030

91,030

Kontrak konstruksi rutin USD 605,505,743 9,082,586 Regular construction contracts


EUR 189,873,148 3,115,534
JPY 7,034,949,170 735,079
Rupiah 26,659,809
Lain-lain/Others **) 7,841,413,351 10,070
39,603,078

*) Dalam jumlah penuh *) In full amount


**) Perolehan barang modal dalam mata uang asing lainnya **) Capital expenditures denominated in other foreign currencies
disajikan dalam jumlah setara USD menggunakan kurs are presented as USD equivalents using the exchange rates
tanggal pelaporan prevailing at the reporting date
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/168 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

c. Perolehan barang modal (lanjutan) c. Capital expenditures (continued)

31 Desember/ Desember 31, 2022


Jumlah
dalam mata
uang asing/ Setara
Amount in Rupiah/
Mata Uang/ foreign Rupiah
Currencies currencies*) equivalent

Program percepatan Fast track program


Kontrak pembangkitan USD 44,599,629 695,397 Power plant contracts
Rupiah - 1,268,234

1,963,631

Kontrak transmisi Rupiah - 65,282 Transmission contracts

Kontrak konstruksi rutin USD 660,301,216 10,295,417 Regular construction contracts


EUR 195,846,989 3,252,744
JPY 8,678,537,824 1,023,685
Rupiah - 33,786,491
Lain-lain/Others**) 10,702

48,369,039

*) Dalam jumlah penuh *) In full amount


**) Perolehan barang modal dalam mata uang asing lainnya **) Capital expenditures denominated in other foreign currencies
disajikan dalam jumlah setara USD menggunakan kurs are presented as USD equivalents using the exchange rates
tanggal pelaporan prevailing at the reporting date

Jumlah diatas adalah diluar dari nilai tersisa The above amount excludes the remaining
pembayaran di muka yang sudah dibayarkan advance payments that have been paid by the
oleh Grup sesuai dengan masing-masing Group in accordance with the respective
kontrak, yang nantinya akan mengurangi contracts, which then will reduce future payments
pembayaran di masa depan yang dilakukan to be made by the Group.
oleh Grup.

Program percepatan Fast track program

Berdasarkan Peraturan Presiden Republik Based on Presidential Regulation of the Republic


Indonesia No. 71 Tahun 2006 tanggal 5 Juli of Indonesia No. 71 Year 2006 dated July 5, 2006
2006 yang kemudian diubah melalui Peraturan which was amended by Presidential Regulation of
Presiden Republik Indonesia No. 59 tanggal 23 the Republic of Indonesia No. 59 dated
Desember 2009, Pemerintah menugaskan December 23, 2009, the Government mandates
Perusahaan untuk membangun PLTU berbahan the Company to build coal-fired PLTUs at 42
bakar batubara di 42 lokasi di Indonesia, locations in Indonesia, which include ten power
meliputi 10 pembangkit dengan jumlah plants with aggregate capacity of 7,490 MW in
kapasitas 7.490 MW di Jawa - Bali dan 32 Java - Bali and 32 power plants with aggregate
pembangkit dengan jumlah kapasitas 2.769 MW capacity of 2,769 MW outside Java - Bali.
di luar Jawa - Bali.

Kontrak pembangkitan Power plant contracts

Sampai dengan tanggal 30 Juni 2023, Until June 30, 2023, the Company has signed 37
Perusahaan telah menandatangani 37 kontrak EPC contracts which consist of ten electricity
EPC meliputi 10 pembangkit tenaga listrik power plants with aggregate capacity of 7,490
dengan jumlah kapasitas 7.490 MW di Jawa - MW in Java - Bali and 27 electricity power plants
Bali dan 27 pembangkit tenaga listrik dengan with aggregate capacity of 2,489 MW outside
jumlah kapasitas 2.489 MW di luar Jawa - Bali. Java - Bali. Based on the EPC contracts, the
Berdasarkan kontrak EPC tersebut, Company is required to pay the contractor a down
Perusahaan diharuskan membayar uang muka payment, which is approximately 15% of the
sekitar 15% dari nilai kontrak dan 85% akan contract price and the remaining 85% will be
didanai melalui fasilitas kredit perbankan. funded through credit facilities from banks.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/169 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

c. Perolehan barang modal (lanjutan) c. Capital expenditures (continued)

Program percepatan (lanjutan) Fast track program (continued)

Kontrak pembangkitan (lanjutan) Power plant contracts (continued)

Sampai dengan tanggal 30 Juni 2023, Until June 30, 2023, the Company has made
Perusahaan telah membayar uang down payment amounting to USD876,217,780
muka sebesar USD876.217.780 (nilai penuh) (full amount) and Rp4,790,016 for 35 EPC
dan Rp4.790.016 untuk 35 kontrak EPC yang contracts which is recorded as construction in
dicatat sebagai aset dalam pembangunan progress (Note 6). The down payments are
(Catatan 6). Uang muka tersebut didanai dari funded by the proceeds of the issued Guaranteed
hasil penerbitan Obligasi Terjamin dan Notes and withdrawal of credit facilities for the fast
penarikan fasilitas kredit program percepatan. track program.

Kontrak transmisi Transmission contracts

Kontrak transmisi merupakan kontrak untuk Transmission contracts are contracts for
peningkatan dan pembangunan transmisi baru upgrading and constructing new transmission and
dan gardu induk di Jawa dan luar Jawa. Proyek sub-stations in Java and outside Java. These
ini dibiayai melalui dana sendiri dan penarikan projects are financed by the Company’s own
fasilitas kredit perbankan. funds and withdrawal of credit facilities from
banks.

Kontrak konstruksi rutin Regular construction contracts

Ikatan pengadaan barang modal untuk Capital expenditure commitments for regular
konstruksi rutin merupakan kontrak yang telah construction represent project contracts signed for
ditandatangani untuk tambahan pembangkit additional electricity generating plants and
listrik dan pengembangan jaringan transmisi development of the transmission and distribution
dan distribusi. Proyek ini dibiayai melalui dana network. These projects are financed by the
sendiri Perusahaan dan pihak luar melalui Company’s own funds and other external funding
pinjaman luar negeri, bantuan dan proyek through offshore loans, grants and investment
investasi sebagai bagian dari anggaran belanja projects from the state budget.
negara.

d. Fasilitas pinjaman yang belum digunakan d. Unused loan facilities

Penerusan pinjaman Two-step loans

Dalam mata uang asing/ Setara/


Mata uang/Currencies In foreign currencies*) Equivalent Rp

USD 610,000,000 9,150,000


JPY 2,622,438,701 274,018

Jumlah/Total 9,424,018

*) Dalam jumlah penuh *) In full amounts

Pada tanggal 30 Juni 2023 dan 31 Desember As at June 30, 2023 and December 31, 2022,
2022, fasilitas pinjaman belum digunakan each of the unused facilities equivalent to
masing-masing setara Rp9.182.354 dan Rp9,182,354 and Rp9,547,463, each bear a
Rp9.547.643 dikenakan provisi masing-masing provision charge of 0.10% - 0.25% and 0.10% -
sebesar 0,10% - 0,25% dan 0,10% - 0,25% per 0.25% per annum, while the remaining facilities
tahun, sedangkan fasilitas masing-masing each of Rp241,664 and Rp366,815 do not bear
sebesar Rp241.664 dan Rp366.815 tidak any provision charge. These facilities will be due
dikenakan provisi. Fasilitas ini berakhir antara between 2022 and 2027.
tahun 2022 sampai dengan 2027.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/170 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

d. Fasilitas pinjaman belum digunakan d. Unused loan facilities (continued)


(lanjutan)

Perjanjian pinjaman tidak terkait program Loan agreements not related to fast track
percepatan program

Sampai dengan tanggal penyelesaian laporan Up to the completion date of the consolidated
keuangan konsolidasian, rincian fasilitas financial statements, details of loan facilities non-
pinjaman tidak terkait program percepatan related to the fast track program are as follows:
adalah sebagai berikut:
Fasilitas
pinjaman
Fasilitas belum Tanggal
maksimum/ digunakan/ perjanjian/ Periode/
Kreditur dan pembiayaan proyek/ Maximum Unused loan Date of Period**)
No. Creditor and project funded facility*) facilities*) agreement Tahun/Year

Fasilitas pinjaman dalam USD/USD loan facilities

1 JBIC 108 14 14 Maret 2016/ 16


PLTU Lontar Extension Facility Tr.A March 14, 2016
2 JBIC 72 9 14 Maret 2016/ 16
PLTU Lontar Extension Facility Tr.B March 14, 2016
3 IDB 330 124 10 Januari 2017/ 15
Power Grid Enhancement Project January 10, 2017
4 JBIC 53 31 20 Juni 2017/ 15
PLTU Kalselteng 2 Facility Tr. A June 20, 2017
5 JBIC 36 21 20 Juni 2017/ 15
PLTU Kalselteng 2 Facility Tr. B June 20, 2017
6 Credit Agricole CIB Paris 280 51 8 November 2017/ 15
PLTGU Muara Tawar November 8, 2017
7 HSBC 214 46 19 Februari 2018/ 15
PLTGU Tambak Lorok III February 19, 2018
8 ADB 600 324 8 Desember 2020/ 20
ADB 4009-INO - RBL KMP December 8, 2020
9 AIIB 310 213 10 Februari 2021/ 20
AIIB L0292A – East Java & Bali Power Distribution February 10, 2021
10 ADB 600 450 31 Desember 2021/ 20
ADB 4164-INO-SREAP Western & Central Java December 31, 2021
11 Bank DBS Indonesia (Agen) 750 750 23 Desember 2022/ 5
Green Loan – DBS 2022 - Onshore December 23, 2022

Jumlah dalam USD/Total in USD 3,353 2,034

Fasilitas pinjaman dalam EUR/EUR loan facilities

1 AFD 71 1 7 Mei 2015/ 15


Trans GIS May 7, 2015
2 KfW 83 3 15 September 2017/ 11
Bangkanai Peaker September 15, 2017
3 KfW 85 83 15 Desember 2017/ 15
Power Plant Kumbih December 15, 2017
4 BGK 81 19 21 Februari 2018/ 15
PLTU Lombok FTP-2 February 21, 2018
5 KfW 150 149 11 Oktober 2018/ 15
Geothermal Energy Program October 11, 2018
6 KfW 225 223 5 September 2019/ 14
Bakaru I + II Hydro Power Project` September 5, 2019
7 KfW 70 69 5 September 2019/ 14
1000 Islands Renewable Energy for electrification Program September 5, 2019
8 Mizuho Bank 85 85 13 Maret 2020/ 12
Riau Peaker - Finnvera Covered Facility March 13, 2020
10 KfW 255 126 8 Desember 2020/ 15
KfW 29069 - RBL SNT December 8, 2020
11 KfW 58 58 22 Desember 2022/ 15
Sustainable Hydropower Programmer I – Sawangan Hydropower December 22, 2022
Plant (HPP) ______________

Jumlah dalam EUR/Total in EUR 1,163 816

*) Dalam jutaan *) In million


**) Termasuk masa tenggang **) Include grace period
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/171 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

d. Fasilitas pinjaman belum digunakan d. Unused loan facilities (continued)


(lanjutan)

Perjanjian pinjaman tidak terkait program Loan agreements not related to non fast track
percepatan (lanjutan) program (continued)
Fasilitas
pinjaman
Fasilitas belum Tanggal
maksimum/ digunakan/ perjanjian/ Periode/
Kreditur dan pembiayaan proyek/ Maximum Unused loan Date of Period**)
No. Creditor and project funded facility*) facilities*) agreement Tahun/Year

Fasilitas pinjaman dalam JPY/JPY loan facilities

1 JBIC 16,430 1,591 14 Maret 2016/ 16


PLTU Lontar March 14, 2016
2 JBIC 20 Juni 2017/ 15
PLTU Kalselteng 2 16,939 10,259 June 20, 2017

Jumlah dalam JPY/Total in JPY 33,369 11,850

Fasilitas pinjaman dalam Rupiah/Rupiah loan facilities

1 BRI 4,506,787 2,246,261 14 November 2018/ 10


Bank Loan Capex Sindikasi 2018 PKS 6 - JBT November 14, 2018
2 BRI 25,000,000 25,000,000 21 Juni 2022/ 1
Kredit Modal Kerja Standby Loan (Revolving) June 21, 2022
3 BNI (Agen Sindikasi) 5,071,000 1,362,275 18 Desember 2019/ 10
11 proyek PLTU dan PLTMG Tahap I December 18, 2019
4 BSI (Agen Sindikasi) 2,846,000 1,577,382 18 Desember 2019/ 10
4 proyek PLTU dan PLTMG Tahap II December 18, 2019
5 BCA (Bilateral) 3,000,000 3,000,000 6 September 2022/ 1
Corporate Loan Facilities BCA 2019 - Revolving September 6, 2022
6 Bank Danamon 2,000,000 2,000,000 12 Desember 2022/ 1
Kredit Modal Kerja 2019 -Danamon - Revolving Syariah December 12, 2022
7 UOB 1,000,000 1,000,000 11 Februari 2022/ 1
Kredit Modal Kerja 2021 – UOB – Revolving February 11, 2022
8 HSBC Indonesia 1,400,000 1,400,000 22 April 2022/ 1
Kredit Modal Kerja 2021 – HSBC – Revolving April 22, 2022
9 Muamalat 1,000,000 1,000,000 21 Februari 2022/
Pembiayaan Musyarakah 2022 – Muamalat - Revolving February 21, 2022 1
10 Bank Maybank Indonesia 1,000,000 1,000,000 14 Maret 2022/.
Pembiayaan Musyarakah 2022 – Maybank - Revolving March 14, 2022 1
11 LPEI 3,500,000 3,500,000 20 Desember 2021/
Kredit Modal Kerja 2021 - LPEI Revolving December 20, 2021 2
12 Bank DKI 1,000,000 1,000,000 28 Maret 2022/
Kredit modal kerja 2022 – Bank DKI – Revolving March 28, 2022 1
13 MUFG Bank 1,000,000 1,000,000 6 April 2022/
Kredit Modal Kerja 2022 – Bank MUFG - Revolving April 6, 2022 1
14 Bank Mandiri 1,000,000 1,000,000 23 Agustus 2022/
Kredit Modal Kerja 2022 – Bank Mandiri - Revolving August 23, 2022 1
15 PT Bank QNB Indonesia Tbk 500,000 500,000 21 September 2022/
Kredit Modal Kerja 2022 – Bank QNB - Revolving September 21, 2022 1
16 BNI 1,308,607 1,308,607 30 November 2022/
Kredit Modal Kerja 2022 – BNI - Revolving November 30, 2022 1
17 BCA (Agen Sindikasi) 10,600,000 10,600,000 9 Desember 2022/
Corporate Loan Facilities 2022 December 9, 2022 10
18 Bank CIMB Niaga 900,000 900,000 9 Desember 2022/
Corporate Loan Facilities 2022 Syariah December 9, 2022 10
19 Bank Bukopin 300,000 300,000 9 Desember 2022/
Corporate Loan Facilities 2022 (Bilateral) December 9, 2022 10
20 PT Bank SBII 200,000 200,000 9 Desember 2022/
Corporate Loan Facilities 2022 (Bilateral) December 9, 2022 10
21 PT Bank Permata Tbk (Agen Sindikasi) 2,750,000 2,750,000 8 Desember 2022/
Bank Loan Sindikasi 2022 PKS 4 Syariah December 8, 2022 10
PLTU Timor 2x5 MW Tahap III

Jumlah dalam IDR/Total in IDR 69,882,394 62,644,525

*) Dalam jutaan *) In million


**) Termasuk masa tenggang **) Include grace period

30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Tingkat suku bunga per tahun Interest rate per annum


Rupiah 3.30% - 5.32% 3.30% - 5.32% Rupiah
USD 0.67% - 5.99% 0.67% - 5.99% USD
JPY 1.58% - 1.73% 1.58% - 1.73% JPY
EUR 0.28% - 4.28% 0.28% - 4.28% EUR
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/172 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

e. Program operasi dan pemeliharaan e. Operation and maintenance programs

Untuk meningkatkan dan memulihkan daya In order to improve and restore the performance
guna unit pembangkit sampai pada tingkat of generator units up to a certain level, the
tertentu, Perusahaan menandatangani Company has entered into Operation and
Operation and Maintenance Agreement dengan Maintenance Agreements with contractors. The
beberapa kontraktor. Nilai kontrak terdiri dari contract payment comprises fixed and variable
porsi tetap dan tidak tetap. Kontraktor portions. The contractors have to meet certain
diharuskan memenuhi target tertentu dan akan targets and will be charged a penalty if these
dikenakan denda jika target tersebut tidak targets are not met. The commitments with the
tercapai. Komitmen dengan kontraktor untuk contractors for the fixed portion are as follows:
porsi tetap adalah sebagai berikut:
Nilai kontrak
Pembangkitan/ Kontraktor/ setara/Contract Periode/
Power plant Contractors amount equivalent Rp Period

PLTU Tanjung Jati B PT Komipo Pembangkitan Jawa Bali 1,249,995 2011 - 2032
PLTU Tanjung Jati B Konsorsium/consortium of
Fortum Service OY & PT Medco Energy 582,392 2005 - 2029

Jumlah 1,832,387 Total

f. Kontinjensi f. Contingencies

(i) Pada tanggal 29 Agustus 2018, (i) On August 29, 2018, the Company faced an
Perusahaan menghadapi Permohonan Arbitration request filed by PT Kalimantan
Arbitrase yang diajukan oleh PT Jawa Gas (“KJG”) as the Applicant against
Kalimantan Jawa Gas (“KJG”) sebagai PC Muriah Ltd (“PCML”) as the first
Pemohon melawan PC Muriah Ltd defendant and the Company as the second
(“PCML”) sebagai Termohon 1 dan defendant in the International Court of
Perusahaan sebagai Termohon 2 di Commerce (“ICC”). The application is related
International Court of Commerce (“ICC”). to the Gas Transportation Agreement
Permohonan tersebut terkait sengketa Gas (“GTA”) dispute between PCML as the
Transportation Agreement (“GTA”) antara Shipper/Seller, KJG as the Transporter, and
PCML selaku Shipper/Penjual, KJG selaku the Company as the Offtaker/Buyer
Transporter, dan Perusahaan selaku regarding the underpayment of gas
Offtaker/Pembeli mengenai kekurangan transportation costs to the PLTGU Tambak
pembayaran atas biaya transportasi gas ke Lorok since the volume of gas sent is less
PLTGU Tambak Lorok dikarenakan volume than the minimum gas volume agreed.
gas yang dikirim kurang dari volume gas
minimum yang disepakati.

Pemohon menuntut pengembalian sejumlah The Applicant demands a refund of the


uang yang dipotong oleh Perusahaan dari amount deducted by the Company from the
tagihan Pemohon sejak April 2018 dan Applicant's invoice since April 2018 and
secara alternatif dengan PCML bertanggung alternatively with PCML being responsible for
jawab atas Ship or Pay (“SOP”) 2016-2019 Ship or Pay ("SOP") for 2016-2019
senilai USD144.536.677 (nilai penuh) amounting to USD144,536,677 (full amount)
ditambah biaya-biaya (pre-award dan post- plus costs (pre-award and post-award). Up to
award). Sampai dengan tanggal the completion date of these consolidated
penyelesaian laporan keuangan financial statements, this case is still in the
konsolidasian ini, perkara ini masih dalam process of being examined at the ICC.
proses pemeriksaan di ICC.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/173 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

f. Kontinjensi (lanjutan) f. Contingencies (continued)

Manajemen meyakini bahwa Perusahaan Management believes that the Company has
memiliki posisi yang kuat karena a strong position because based on legal
berdasarkan fakta hukum, kegagalan facts, the failure to deliver the agreed gas
pengiriman volume gas yang disepakati volume was not caused by the Company's
tidak disebabkan oleh kesalahan dari fault, but was PCML's fault due to its failure
Perusahaan melainkan kesalahan dari to supply gas according to the agreed
PCML karena kegagalannya dalam minimum gas volume. In addition, KJG and
menyediakan gas sesuai volume gas the Company have agreed that KJG frees
minimum yang disepakati. Selain itu, KJG the Company from the responsibility for
dengan Perusahaan telah menyepakati paying the 2016-2019 SOP, whatever the
bahwa KJG membebaskan Perusahaan decision of the ICC Assembly will be.
dari tanggung jawab pembayaran SOP Therefore, there is no provision that needs to
2016-2019, apapun putusan Majelis ICC be recognised in this regard.
nantinya. Oleh sebab itu, tidak ada provisi
yang perlu diakui berkaitan dengan hal ini.

(ii) Pada tanggal 31 Mei 2018, Konsorsium (ii) On May 31, 2018, Consortium Kinarya Liman
Kinarya Liman Margaseta (“KKLM”) Margaseta (“KKLM”) filed an arbitration
mengajukan permohonan penyelesaian request for dispute settlement against IP and
perselisihan melalui arbitrase terhadap IP PGN to Indonesian National Arbitrage
dan PGN kepada Badan Arbitrase Nasional Agency (“BANI”). The dispute was caused by
Indonesia (“BANI”). Perselisihan ini the termination of the lease of gas fuel
disebabkan permintaan pengakhiran distribution facility agreement for PLTGU
perjanjian sewa fasilitas penyaluran bahan Priok by IP. KKLM required IP to pay
bakar gas untuk PLTGU Priok oleh IP, compensation to KKLM amounted to
KKLM menuntut bahwa IP harus Rp172,273.
membayar ganti rugi kepada KKLM
sebesar Rp172.273.

Setelah melalui serangkaian proses hukum After through a series of legal processes from
dari tahun 2019 sampai dengan 2022, 2019 to 2022, both of the two parties agreed
kedua pihak sepakat untuk to sign a settlement agreement Number: 399.
menandatangani kesepakatan Pj/060/IP/2022 for Company and No.
penyelesaian Nomor: 399.Pj/060 /IP/2022 001/KKLM/IX/2022 for KKLM on September
untuk IP dan Nomor: 001/KKLM/IX/2022 8, 2022 in the Registrar of the South Jakarta
untuk KKLM pada tanggal 8 September District Court.
2022 di hadapan Panitera Pengadilan
Negeri Jakarta Selatan.

IP telah membayar nilai penyelesaian yang IP has paid the settlement amounted to
telah disepakati sebesar Rp129.000. IP Rp129,000. IP has recorded a provision of
telah membukukan provisi senilai Rp87,446 in 2021 which was recorded as
Rp87.446 di tahun 2021 yang dicatat pada other expenses in profit or loss and an
beban lain-lain dalam laba rugi dan additional expense of Rp41,554 was
tambahan beban senilai Rp41.554 dicatat recorded as other expenses in profit or loss
pada beban lain-lain dalam laba rugi di in 2022 for the settlement agreement.
tahun 2022 atas kesepakatan
penyelesaian tersebut.

Atas tindak lanjut kesepakatan perdamaian Following the peace agreement described
yang telah diuraikan diatas, seluruh above, all case investigations in the case with
pemeriksaan perkara dalam kasus dengan KKLM have been stopped.
KKLM telah dihentikan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/174 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

f. Kontinjensi (lanjutan) f. Contingencies (continued)

(iii) Pada November 2018, terdapat (iii) In November 2018, there was a dispute
perbedaan terkait dengan penyediaan gas regarding the supply of gas over the
atas penerapan Amandemen II Perjanjian implementation of the Amendment II of the
Jual Beli Tenaga Listrik antara PLN Batam Power Purchase Agreement between PLN
dengan PT Energi Listrik Batam (“ELB”). Batam and PT Energi Listrik Batam (“ELB”).
Atas perbedaan tersebut, ELB Regarding the dispute, ELB filed an
mengajukan gugatan arbitrase melalui arbitration lawsuit through BANI, which was
BANI, yang dibatalkan oleh Pengadilan canceled by Batam District Court. On
Negeri Batam. Pada tanggal 25 Januari January 25, 2022, ELB submitted an appeal
2022, ELB telah mengajukan permohonan to the Supreme Court regarding the
banding kepada Mahkamah Agung terkait cancellation result at Batam District Court.
hasil pembatalan di Pengadilan Negeri
Batam.

Pada tanggal 5 Juli 2022, Mahkamah On July 5, 2022, the Supreme Court has
Agung telah memutuskan perkara ini decided on this case which reject the
dengan menolak permohonan pembatalan cancellation request submitted by PLN
yang diajukan oleh PLN Batam dan Batam and strengthen BANI’s Arbitrase
menguatkan Putusan Arbitrase BANI. Decision.

Pada tanggal 6 Maret 2023, melalui On March 6, 2023, through the Agreement
Perjanjian Penyelesaian dan Pelaksanaan on Settlement and Implementation of the
Putusan Mahkamah Agung nomor Supreme Court Decision number
996B/Pdt.Sus.Arbt/2022, PLN Batam akan 996B/Pdt.Sus.Arbt/2022, PLN Batam would
melaksanakan pembayaran ganti rugi pay compensation amounting IDR77,389 to
sebesar Rp77.389 ke ELB. Pada tanggal ELB. On June 30, 2023, the compensation
30 Juni 2023, pembayaran atas ganti rugi payment has been made by PLN Batam.
tersebut sudah dilaksanakan oleh PLN
Batam.

(iv) Pada tanggal 24 Juni 2020, Perusahaan (iv) On June 24, 2020, the Company faced an
menghadapi gugatan yang diajukan oleh Arbitration Request filed by PT Sumsel
PT Sumsel Energi Gemilang (“SEG”) di Energi Gemilang (“SEG”) in the Indonesian
BANI terkait perselisihan pelaksanaan National Arbitration Board (“BANI”)
perjanjian jual beli gas dan kesepakatan regarding dispute in the implementation of
bersama dalam hal ini yaitu mengenai gas sales and purchase agreement and
kewajiban pembayaran jumlah minimum mutual agreement regarding the obligation
gas atau Take or Pay (“TOP”) dan jumlah to pay minimum gas amount or Take or Pay
penyaluran gas minimum atau SOP. (“TOP”) and minimum gas distribution
amount or SOP.

Pemohon menuntut pembayaran TOP dan The Claimant demanded TOP and SOP
SOP tersebut mulai dari tahun 2015 payment starting from 2015 to 2019
sampai dengan 2019 dengan nilai total amounted to USD31,523,588 (full amount).
USD31.523.588 (nilai penuh). Pada 3 Mei On May 3, 2021, BANI has decided that the
2021, BANI telah memutuskan perkara ini Company must pay compensation to the
dengan amar putusan menghukum Plaintiff amounted to USD27,021,871 (full
Perusahaan membayar USD27.021.871 amount). On June 22, 2021, the Company
(nilai penuh). Pada tanggal 22 Juni 2021, submitted a petition to annul the BANI
Perusahaan mengajukan upaya hukum arbitration verdict to District Court of South
pembatalan putusan BANI tersebut ke Jakarta.
Pengadilan Negeri Jakarta Selatan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/175 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
f. Kontinjensi (lanjutan) f. Contingencies (continued)

Pada tanggal 11 Oktober 2021, On October 11, 2021 the District Court of
Pengadilan Negeri Jakarta Selatan telah South Jakarta has decided a lawsuit filed
memutuskan upaya pembatalan putusan by the Company with register No.
arbitrase yang diajukan oleh Perusahaan 555/Pdt.Sus-Arbt/2021/PN.Jkt.Sel with a
melalui Putusan No. 555/Pdt.Sus-Arbt/ verdict to annul the arbitration decision No.
2021/PN.Jkt.Sel dengan amar putusan 43037/VI/ARB-BANI/2020 dated May 3,
membatalkan Putusan BANI 2021. On October 21, 2021, SEG
No. 43037/VI/ARB-BANI/2020 tanggal submitted an appeal to the Supreme
3 Mei 2021. Pada tanggal 21 Oktober Court to annul the decision of the
2021, SEG mengajukan upaya hukum Supreme Court.
banding atas Putusan Pengadilan Negeri
yang membatalkan Putusan Arbitrase
tersebut ke Mahkamah Agung.

Selanjutnya pada tanggal 14 April 2022 On April 14, 2022 the Supreme Court has
Mahkamah Agung telah memutuskan decided on this case with an Amar
perkara ini dengan Amar Putusan Decision reducing the value of BANI's
mengurangi nilai putusan BANI menjadi decision to USD13,510,935 (full amount)
USD13.510.935 (nilai penuh) atau setara or equivalent to Rp210,662 and can be
Rp210.662 dan dapat dibayar secara paid in stages no later than 10 years after
bertahap paling lama 10 tahun sejak the cancellation request is registered in
permohonan pembatalan didaftarkan di court. The Company has recorded a
pengadilan. Perusahaan telah provision of Rp210,662 in 2022 which
membukukan provisi senilai Rp210.662 di recorded as other expenses in
tahun 2022 yang dicatat pada beban lain- consolidated profit or loss.
lain dalam laba rugi konsolidasian.

(v) Pada tanggal tanggal 29 April 2021, (v) On April 29, 2021, the Company faced a
Perusahaan menghadapi gugatan yang lawsuit filed by Ince Baharudin and Ince
diajukan oleh Ince Baharudin dan Ince Rahmawati as a Plaintiff in the District
Rahmawati sebagai Penggugat di Court of Makassar with register No.
Pengadilan Negeri Makassar dengan 152/Pdt.G/2021/PN.Mks regarding the
register No. 152/Pdt.G/2021/PN.Mks terkait Company’s land located at Latimojong
kepemilikan aset tanah milik Perusahaan di Street, Makassar. The Plaintiff filed for
Jalan Latimojong Makassar. Penggugat material losses due to the Company's
mengajukan kerugian materiil akibat control of the disputed land amounted to
penguasaan tanah sengketa oleh Rp432,647 and non-material losses of
Perusahaan sebesar Rp432.647 dan approximately Rp200,000. The Plaintiff
kerugian non materiil sekitar Rp200.000. filed a demand that the Company vacate
Penggugat mengajukan tuntutan agar the land and then hand over the land to
Perusahaan mengosongkan tanah dan the Plaintiff. Management believes the
selanjutnya menyerahkan tanah tersebut Company has a strong position due to the
ke Penggugat. Manajemen meyakini fact that the Company has documentation
Perusahaan memiliki posisi yang kuat showing proof of ownership of land rights
karena faktanya Perusahaan memiliki originating from the nationalisation of the
dokumentasi bukti kepemilikan hak atas Dutch Electricity Company (NV OGEM).
tanah yang berasal dari nasionalisasi
Perusahaan Listrik Belanda (NV OGEM).

Pada tanggal 3 Februari 2022, perkara On February 3, 2022, the District Court of
tersebut telah diputus oleh Pengadilan Makassar has decided to deny the entire
Negeri Makassar dengan amar putusan Plaintiff's claim. On February 16, 2022, the
menolak seluruh gugatan Penggugat. Plaintiff filed an appeal to the High Court of
Pada tanggal 16 Februari 2022, Makassar.
Penggugat mengajukan permohonan
Banding ke Pengadilan Tinggi Makassar.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/176 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

f. Kontinjensi (lanjutan) f. Contingencies (continued)

Pada tanggal 8 September 2022, upaya On September 8, 2022, the appeal was
hukum banding tersebut telah diputus oleh decided by the Makassar High Court with
Pengadilan Tinggi Makassar dengan Amar the decision to strengthen the Makassar
Putusan Menguatkan Putusan Pengadilan District Court’s decision No.
Negeri Makassar No. 152/Pdt.G/2021/PN.Mks which has
152/Pdt.G/2021/PN.Mks yang telah permanent inkracht based on the letter of
berkekuatan hukum tetap berdasarkan the Head of State Court of Makassar on
Surat Ketua Pengadilan Negeri Makassar January 25, 2023.
tanggal 25 Januari 2023.

(vi) Pada tanggal tanggal 25 Oktober 2016, (vi) On October 25, 2016, the Company faced a
Perusahaan menghadapi gugatan yang lawsuit filed by Poe Soe Fang as a Plaintiff
diajukan oleh Poe Soe Fang sebagai and also as the Commissioner of PT Barito
Penggugat, dalam hal ini juga sebagai Jaya, in the District Court of North Jakarta
Komisaris PT Barito Jaya, di Pengadilan with register No.
Negeri Jakarta Utara dengan register No. 501/Pdt.G/2016/PN.JKT.UTR regarding the
501/Pdt.G/2016/PN.JKT.UTR terkait Procurement of Land for Construction
Pengadaan Tanah untuk Pembangunan PLTMG Kalsel Peaker 200 MW. The
PLTMG Kalsel Peaker 200 MW. Plaintiff filed for the compensation due to
Penggugat mengajukan ganti rugi atas the Procurement of Land for Publics
Pengadaan Tanah bagi Pembangunan amounted to Rp191,386 that has been
untuk kepentingan Umum sebesar previously agreed by the Defendant I, Edy
Rp191.386 yang sebelumnya sudah Kartono as President Director of PT Barito
disetujui oleh Tergugat I, Edy Kartono Jaya, amounted to Rp18,321. The Plaintiff
selaku Direktur Utama PT Barito Jaya, submitted the claims in order to get the
sebesar Rp18.321. Penggugat compensation from the Company amounted
mengajukan tuntutan agar Perusahaan to Rp191,386 instead of Rp18,321.
dapat mengganti rugi sebesar Rp191.386
bukan sebesar Rp18.321.

Pada tanggal 23 Oktober 2018, perkara On October 23, 2018, the District Court of
tersebut telah diputus oleh Pengadilan North Jakarta has decided to deny the
Negeri Jakarta Utara dengan amar entire Plaintiff's claim. On November 1,
putusan menolak seluruh gugatan 2018, the Plaintiff filed an appeal to the
Penggugat. Pada tanggal 1 November High Court of North Jakarta and sent the
2018, Penggugat mengajukan Memorandum of Appeal on May 7, 2019.
permohonan Banding ke Pengadilan
Tinggi Jakarta Utara dan menyerahkan
Memori Banding pada tanggal 7 Mei 2019.

Perusahaan menyampaikan Kontra The Company submitted the Counter


Memori Banding pada tanggal 15 Memorandum of Appeal on November 15,
November 2019. 2019.

Sampai dengan tanggal penyelesaian Up to the completion date of these


laporan keuangan konsolidasian ini, kasus consolidated financial statements, this case
ini masih dalam tahap proses banding di is still in the appeal process in the High
Pengadilan Tinggi Jakarta Utara. Court of North Jakarta.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/177 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN PENTING, IKATAN DAN 54. SIGNIFICANT AGREEMENTS, COMMITMENTS


KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)

f. Kontinjensi (lanjutan) f. Contingencies (continued)

(vii) Pada tanggal 7 Juni 2022, Perusahaan (vii) On June 7, 2022, the Company faced a
menghadapi gugatan yang diajukan oleh lawsuit filed by Ronny Rotinsulu Tumengkol
Ronny Rotinsulu Tumengkol sebagai as a Plaintiff in the District Court of Tondano
Penggugat di Pengadilan Negeri Tondano with register No.172/Pdt.G/2022/PN.Tnn
dengan register No. regarding ownership of land right in PLTA
172/Pdt.G/2022/PN.Tnn terkait Tonsea Lama. The Plaintiff filed for losses
kepemilikan atas tanah di PLTA Tonsea amounted to Rp409,560 and a demand that
Lama. Penggugat mengajukan ganti rugi the land of 15,000 m2 with proof of
sebesar Rp409.560 dan tuntutan bahwa ownership of land rights by Land Line Book
tanah seluas 15.000 m2 dengan bukti of Tonsea Lama No. 829 Folio 80 is on
kepemilikan berupa Buku Garisan Tanah behalf of Almarhum Hendrik Nelwan.
Tonsea Lama No. 829 Folio 80 adalah
atas nama Almarhum Hendrik Nelwan.

Pada tanggal 5 April 2023, perkara On April 5, 2023, the District Court of
tersebut telah diputus oleh Pengadilan Tondano has decided to declare
Negeri Tondano dengan amar putusan inadmissable the Plaintiff’s claim. On April
gugatan tidak dapat diterima. Penggugat 26, 2023, the Plaintiff filed an appeal to the
mengajukan permohonan Banding ke High Court of Manado and sent the
Pengadilan Tinggi Manado dan Memorandum of Appeal on April 26, 2023.
menyerahkan Memori Banding pada
tanggal 26 April 2023.

Perusahaan menyampaikan Kontra The Company submitted the Counter


Memori Banding pada tanggal 12 Mei Memorandum of Appeal on May 12, 2023.
2023.

Kasus ini masih dalam tahap proses This case is still in the appeal process in the
banding di Pengadilan Tinggi Manado. High Court of Manado.

(viii) Grup juga menghadapi gugatan sengketa (viii) The Group also faces claims for
ganti rugi dalam jumlah yang tidak compensation of losses, which are
material di beberapa lokasi bangunan immaterial in amount, in several areas of
jaringan transmisi atau distribusi, its transmission or distribution facilities,
perselisihan dengan karyawan, perkara disputes with its employees and cases
dengan pelanggan dan pemasok. with customers and suppliers. With
Terhadap gugatan serta ganti rugi yang respect to the claim and compensation
bersifat tidak materiil tersebut, Grup telah that is not material, the Group has followed
menindaklanjutinya sesuai ketentuan up in accordance with the provisions of the
peraturan perundang - undangan yang applicable laws and regulations.
berlaku. Manajemen berpendapat klaim- Management believes that such claims are
klaim tersebut tidak material dan tidak not material and will not significantly affect
mempengaruhi kegiatan usaha Grup. the Group’s operations.

Sampai dengan tanggal penyelesaian Up to the completion date of these


laporan keuangan konsolidasian ini, hasil consolidated financial statements, the
litigasi di atas tidak dapat diestimasi secara results of the above litigation cannot be
andal atau Grup memiliki alasan yang kuat reliably estimated or the Group has strong
untuk mendukung kasus tersebut, oleh grounds supporting the case, therefore, the
karena itu, Grup berpendapat bahwa Group is of the opinion that adverse
keputusan yang merugikan dalam setiap decisions in any pending or threatened
proses hukum yang tertunda atau terancam proceedings or that any amount it may be
atau bahwa setiap jumlah yang mungkin required to pay by reason thereof is unlikely
harus dibayar dengan alasan tersebut tidak to have a material adverse effect on its
mungkin memiliki dampak material yang financial condition or the results of
merugikan pada kondisi keuangan atau operations.
hasil operasinya.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/178 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL CAPITAL RISK MANAGEMENT

a. Kategori dan klasifikasi instrumen keuangan a. Categories and classes of financial


instruments

Pada tanggal 30 Juni 2023 dan 31 Desember As at Juen 30, 2023 and December 31, 2022, the
2022, Grup mengklasifikasikan kas dan setara Group classified its cash and cash equivalents,
kas, piutang usaha, piutang dari Pemerintah, trade receivables, receivables from Government,
piutang lain-lain, piutang pihak berelasi, other receivables, receivables from related
rekening bank dibatasi penggunaannya, dan parties, restricted cash in banks and short term
investasi jangka pendek sebesar investments amounted to Rp116,596,276 (2022:
Rp116.596.434 (2022: Rp107.257.219) sebagai Rp107,257,219) as financial assets at amortised
aset keuangan yang diukur pada biaya cost and derivative asset classified by the Group
perolehan diamortisasi dan aset derivatif yang as derivative financial instrument through profit or
diklasifikasikan oleh Grup sebagai instrumen loss amounted to Rp7,331 (2022: Rp107,068).
keuangan derivatif yang dicatat pada laba rugi
sebesar Rp7.331 (2022: Rp107.068).

Pada tanggal 30 Juni 2023 dan 31 Desember As at June 30, 2023 and December 31, 2022, the
2022, Grup mengklasifikasikan utang usaha, Group classified its trade payables, accrued
biaya masih harus dibayar, uang jaminan expenses, customer security deposits, project
langganan, utang biaya proyek, utang cost payable, accrued expenses, two-step loans,
penerusan pinjaman, utang kepada Pemerintah Government and non-bank Government financial
dan lembaga keuangan Pemerintah non-bank, institution loan, lease liabilities, bank loan, bonds
utang sewa, utang bank, utang obligasi dan payable and sukuk ijara, electricity purchase
sukuk ijarah, utang listrik swasta, utang KIK - payable, KIK - EBA loans, payable to related
EBA, utang pihak berelasi dan utang lain-lain party, and other payables amounted to
sebesar Rp475.336.106 (2022: Rp500.422.267) Rp475,336,106 (2022: Rp500,422,267) as
sebagai kewajiban keuangan yang diukur pada financial liabilities carried at amortised cost and
biaya perolehan diamortisasi dan liabilitas derivative liabilities classified by the Group as
derivatif yang diklasifikasikan oleh Grup sebagai derivative financial instrument through profit or
instrumen keuangan derivatif yang dicatat pada loss amounted to Rpnil (2022: Rpnil).
laba rugi sebesar Rpnihil (2022: Rpnihil).

b. Manajemen risiko modal b. Capital risk management

Grup mengelola risiko modal untuk memastikan The Group manages capital risk to ensure that it
bahwa mereka akan mampu untuk melanjutkan will be able to continue as a going concern and to
kelangsungan usaha dan untuk memastikan ensure compliance with the covenants of the
pemenuhan batasan rasio kecukupan modal. capital adequacy ratio. The Group’s capital
Struktur modal Grup terdiri dari pinjaman structure consists of debt (Notes 24, 25, 26, 27,
(Catatan 24, 25, 26, 27, 28 dan 29) dan ekuitas 28 and 29) and equity attributable to owners of
pemegang saham induk, yang terdiri dari modal the parent consisting of capital stock (Note 21),
yang ditempatkan (Catatan 21), saldo laba, dan retained earnings and additional paid-in capital
tambahan modal disetor (Catatan 22). (Note 22).

Direksi Perusahaan secara berkala melakukan The Directors of the Company periodically review
tinjauan struktur permodalan Grup. Sebagai the Group’s capital structure. As part of this
bagian dari tinjauan ini, Direksi review, the Board of Directors considers the cost
mempertimbangkan biaya permodalan dan of capital and related risks.
risiko yang berhubungan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/179 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL (lanjutan) CAPITAL RISK MANAGEMENT (continued)

b. Manajemen risiko modal (lanjutan) b. Capital risk management (continued)

Batasan pinjaman Perusahaan mensyaratkan The Company’s loan covenants require among
antara lain pemenuhan rasio pinjaman terhadap other things, the fulfillment of a certain debt to
ekuitas dan rasio kecukupan modal. equity ratio and capital adequacy ratio.
Manajemen secara berkala memonitor Management regularly monitors such
persyaratan tersebut untuk memastikan tidak requirements to ensure that there are no defaults
terdapat pelanggaran dalam batasan pinjaman on the loans of the Company.
Perusahaan.

Grup berusaha untuk meminimalkan biaya The Group aims to minimise the cost of debt in
pinjaman sehingga dapat memaksimalkan nilai order to maximise their value. Therefore, in its
Grup. Oleh karena itu, kebijakan Grup dalam financing policies, the Group always takes into
mencari pendanaan melalui utang selalu account the financial risk that may arise in the
memperhitungkan risiko keuangan yang future.
mungkin timbul di masa depan.

c. Tujuan dan kebijakan manajemen risiko c. Financial risk management objectives and
keuangan policies

Tujuan dan kebijakan manajemen risiko The objectives and policies of the Group’s
keuangan Grup adalah untuk memastikan financial risk management are to ensure that
bahwa sumber daya keuangan yang memadai adequate financial resources are available for the
tersedia untuk operasi dan pengembangan operation and development of their business,
bisnis, serta untuk mengelola risiko pasar while managing their exposure to market risks
(termasuk risiko mata uang asing dan risiko (including foreign currency risk and interest rate
tingkat suku bunga), risiko kredit dan risiko risk), credit risk and liquidity risk. The Group
likuiditas. Grup beroperasi dengan kebijakan operates within defined policies approved by the
yang telah ditentukan oleh Direksi. Directors.

Dalam pengelolaan risiko, Grup membentuk In managing those risks, the Group established a
Subdirektorat Manajemen Risiko (“SEVP Risk subdirectorate of Risk Management (“SEVP Risk
Management”) yang bertanggung jawab Management”) which is responsible for the
terhadap penyusunan kebijakan, kerangka preparation of the policies, the relevant
kerja, pedoman penerapan manajemen risiko frameworks, implementation guideline and the
dan infrastruktur pengelolaan risiko, serta necessary risk management infrastructure to
memastikan implementasi manajemen risiko ensure the implementation of risk management in
tersebut di lingkungan Grup. Subdirektorat ini the Group’s environment. The subdirectorate is
juga bertugas untuk memfasilitasi penyusunan also established to facilitate a strategic risk profile
profil risiko yang bersifat strategis sebagai as an early warning to the Group’s management.
himbauan awal kepada manajemen Grup. SEVP Risk Management is responsible to the
SEVP Risk Management bertanggung jawab Director of Finance.
kepada Direktur Keuangan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/180 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
KEUANGAN DAN RISIKO MODAL (lanjutan) AND CAPITAL RISK MANAGEMENT (continued)

c. Tujuan dan kebijakan manajemen risiko c. Financial risk management objectives and
keuangan (lanjutan) policies (continued)

Grup telah menetapkan taksonomi risiko The Group has established a risk taxonomy by
dengan membagi risiko menjadi lima kelompok dividing risk into five categories, such as strategic
yaitu risiko strategis, risiko keuangan, risiko risk, financial risk, operational risk, project risk
operasional, risiko proyek, dan risiko and compliance risk. Financial risk includes
kepatuhan. Risiko keuangan diantaranya market risk (including foreign currency risk and
adalah risiko pasar (termasuk risiko mata uang interest rate risk), credit risk and liquidity risk. In
asing dan risiko tingkat suku bunga), risiko managing those risks, the Group considers
kredit dan risiko likuiditas. Dalam mengelola prioritisation based on risk level. Risk level is
risiko, Grup mempertimbangkan skala prioritas determined by the level of possibility and scale of
yang didasarkan pada tingkat risikonya. potential impact.
Tingkat risiko ditentukan berdasarkan tingkat
kemungkinan terjadinya dan skala dampak
yang ditimbulkan.

Terkait dengan risiko keuangan, Grup telah Related to financial risks, the Group has
menetapkan kebijakan manajemen untuk established management’s policy related to
melakukan transaksi lindung nilai. Sebagai hedging transactions. As an SOE, the approved
salah satu BUMN, kebijakan manajemen yang management policy is very important in order to
telah disetujui menjadi sangat penting agar avoid any issues that may arise during the
tidak timbul masalah pada waktu pelaksanaan implementation of such hedging programs. All
akuntansi lindung nilai tersebut. Seluruh derivative instruments are recognised in the
instrumen derivatif dicatat dalam laporan posisi consolidated statement of financial position at
keuangan konsolidasian berdasarkan nilai their fair values. Fair value is determined based
wajarnya. Nilai wajar tersebut ditentukan on market value using the Bloomberg rate at the
berdasarkan harga pasar dengan reporting date. Derivative assets or liabilities are
menggunakan kurs Bloomberg pada tanggal presented at the amount of unrealised gain or
laporan. Aset dan liabilitas derivatif disajikan loss from derivative contracts. The Group’s
sebesar keuntungan maupun kerugian yang derivative contracts are classified as financial
belum direalisasi dari kontrak derivatif. Kontrak assets measured at FVTPL. These transactions
derivatif Grup diklasifikasikan sebagai aset are solely intended for mitigating foreign
keuangan yang diukur pada FVTPL. Transaksi exchange risk, not for trading and ensuring the
ini semata-mata dimaksudkan untuk memitigasi availability of foreign currency liquidity for principal
risiko nilai tukar, tidak untuk diperdagangkan, and interest payment due in the 1-3 months of the
dan memastikan ketersediaan likuiditas valas Group’s reporting period. Refer to Note 3 for the
untuk pembayaran sebagian kewajiban valas accounting policy of financial assets and liabilities
yang jatuh tempo dalam jangka waktu 1-3 bulan for the financial instruments classification. The
pada periode pelaporan Grup. Lihat Catatan 3 Group does not apply hedge accounting on those
untuk kebijakan akuntansi untuk aset keuangan transactions.
dan liabilitas keuangan untuk klasifikasi
instrumen keuangan. Grup tidak menerapkan
akuntansi lindung nilai atas transaksi-transaksi
tersebut.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/181 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL (lanjutan) CAPITAL RISK MANAGEMENT (continued)

c. Tujuan dan kebijakan manajemen risiko c. Financial risk management objectives and
keuangan (lanjutan) policies (continued)

Manajemen risiko mata uang asing Foreign currency risk management

Grup memiliki banyak transaksi dan sumber The Group undertakes many transactions and
pendanaan dalam mata uang asing. Sebagai funding sources denominated in foreign
akibatnya timbul eksposur terhadap fluktuasi currencies. Consequently, there are exposures to
nilai tukar mata uang asing. exchange rate fluctuations.

Grup telah melakukan diskusi dengan Bank The Group holds regular discussions with Bank
Indonesia (“BI”) untuk mendapatkan Indonesia (“BI") to get a comprehensive
pemahaman komprehensif atas keadaan pasar. understanding of the market outlook. The Group
Grup kemudian akan mempertimbangkan then incorporates this outlook into its internal
keadaan pasar ke dalam proyeksi keuangan financial forecasts and develops a concerted
internal mereka dan mengembangkan strategi strategy to mitigate its foreign currency exposure
yang telah disetujui bersama untuk memitigasi by purchasing the required foreign currency
eksposur risiko mata uang asing dengan denominated instruments at the right time.
membeli instrumen mata uang asing yang
dibutuhkan disaat yang tepat.

Jumlah eksposur mata uang asing bersih Grup The Group’s foreign currency exposure as at the
pada tanggal pelaporan diungkapkan dalam reporting date is disclosed in Note 52.
Catatan 52.

Sensitivitas mata uang asing Foreign currency sensitivity

Tabel di bawah ini memaparkan rincian The following table explains the details of the
sensitivitas Grup untuk setiap 10% kenaikan Group’s sensitivity to a 10% increase and
dan penurunan Rupiah terhadap mata uang decrease in Rupiah against the relevant foreign
asing yang relevan. Kenaikan dan penurunan currencies. This 10% increase or decrease
10% menggambarkan penilaian manajemen represents management’s assessment of the
terhadap perubahan yang rasional pada nilai reasonably possible changes in foreign currency
tukar dengan mempertimbangkan kondisi rates considering the current economic
ekonomi saat ini. Analisis sensitivitas ini conditions. The sensitivity analysis includes after
mencakup saldo item moneter setelah pajak tax outstanding foreign denominated monetary
dalam mata uang asing dan menyesuaikan items and adjusts their translation at the end of
translasi pada akhir tahun untuk 10% the year for a 10% change in foreign currency
perubahan dalam nilai tukar mata uang asing. rates.
30 Juni 2023/ June 30, 2023
USD JPY EUR Others
10% -10% 10% -10% 10% -10% 10% -10%
Aset keuangan Financial assets
Piutang pihak berelasi 160,749 (160,749) - - - - - - Receivables from related parties
Rekening dan deposito Berjangka dibatasi penggunaannya 64,405 (64,405) 342,089 (342,089) - - - - Restricted cash in banks and time deposits
Kas dan setara kas 458,608 (458,608) 14,675 (14,675) 12,431 (12,431) 1,885 (1,885) Cash and cash equivalents
Investasi jangka pendek 59,549 (59,549) Short term investment
Jumlah aset keuangan 743,311 (743,311) 356,764 (356,764) 12,431 (12,431) 1,885 (1,885) Total financial assets

Liabilitas keuangan Financial liabilities


Penerusan pinjaman (1,083,460) 1,083,460 (1,189,789) 1,189,789 (13,215) 13,215 - - Two-step loans
Utang sewa (41,285) 41,285 (212,591) 212,591 - - - - Lease liabilities
Utang bank dan surat utang jangka menengah (5,006,688) 5,006,688 (619,007) 619,007 (1,181,073) 1,181,073 - - Bank loans and medium term notes
Utang obligasi (11,920,325) 11,920,325 (158,929) 158,929 (1,279,863) 1,279,863 - - Bonds payable
Utang listrik swasta (448,734) 448,734 - - - - - - Electricity purchase payable
Utang lain-lain (148,747) 148,747 (33,575) 33,575 (15,864) 15,864 - - Other payables
Utang biaya proyek (38,868) 38,868 (39,004) 39,004 (2,524) 2,524 - - Project cost payable
Utang usaha (1,501,291) 1,501,291 - - - - (13,670) 13,670 Trade payables
Biaya masih harus dibayar (230,491) 230,491 (27,360) 27,360 (24,486) 24,486 - - Accrued expenses
Jumlah liabilitas keuangan (20,419,889) 20,419,889 (2,280,255) 2,280,255 (2,517,025) 2,517,025 (13,670) 13,670 Total financial liabilities

Jumlah - bersih (19,676,578) 19,676,578 (1,923,491) 1,923,491 (2,504,594) 2,504,594 (11,785) 11,785 Total-net

*) Tidak memperhitungkan efek atas kapitalisasi biaya pinjaman *) Not considering the effect of borrowing cost capitalisation
**) Mata uang asing lainnya disajikan dalam jumlah setara USD **) Other foreign currencies are presented as USD equivalent using the
menggunakan kurs tanggal pelaporan exchange rates prevailing at reporting date
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/182 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL (lanjutan) CAPITAL RISK MANAGEMENT (continued)

c. Tujuan dan kebijakan manajemen risiko c. Financial risk management objectives and
keuangan (lanjutan) policies (continued)

Sensitivitas mata uang asing (lanjutan) Foreign currency sensitivity (continued)


Dampak terhadap laba setelah pajak/
Effect to profit after tax*)
31 Desember/ December 31, 2022
USD JPY EUR Lain-lain/Others**)
10% -10% 10% -10% 10% -10% 10% -10%

Aset keuangan Financial assets


Receivables from
Piutang pihak berelasi 111,223 (111,223) - - - - - - related parties
Rekening dan deposito Restricted
berjangka dibatasi cash in banks and
penggunaannya 87,706 (87,706) 272,087 (272,087) - - - - time deposits
Cash and cash
Kas dan setara kas 651,159 (651,159) 15,612 (15,612) 11,573 (11,573) 11,260 (11,260) equivalents

Jumlah aset keuangan 850,088 (850,088) 287,699 (287,699) 11,573 (11,573) 11,260 (11,260) Total financial assets

Liabilitas keuangan Financial liabilities


Penerusan pinjaman (1,195,238) 1,195,238 (1,381,960) 1,381,960 (14,356) 14,356 - - Two-step loans
Utang sewa (46,278) 46,278 (358,864) 358,864 - - - - Lease liabilities
Utang bank dan Bank loans
surat utang and medium
jangka menengah (6,051,801) 6,051,801 (729,468) 729,468 (1,248,464) 1,248,464 - - term notes
Utang obligasi (12,390,781) 12,390,781 (179,411) 179,411 (1,295,471) 1,295,471 - - Bonds payable
Electricity purchase
Utang listrik swasta (486,778) 486,778 - - - - - - payable
Utang lain-lain (166,443) 166,443 (24,695) 24,695 (33,480) 33,480 - - Other payables
Utang biaya proyek (46,211) 46,211 (47,650) 47,650 (3,146) 3,146 - - Project cost payables
Utang usaha (1,628,876) 1,628,876 - - - - (13,717) 13,717 Trade payables
Biaya masih harus
dibayar (221,287) 221,287 (58,220) 58,220 (8,731) 8,731 - - Accrued expenses

Jumlah liabilitas Total financial


keuangan (22,233,693) 22,233,693 (2,780,268) 2,780,268 (2,603,648) 2,603,648 (13,717) 13,717 liabilities

Jumlah - bersih (21,383,605) 21,383,605 (2,492,569) 2,492,569 (2,592,075) 2,592,075 (2,457) 2,457 Total - net

*) Tidak memperhitungkan efek atas kapitalisasi biaya pinjaman *) Not considering the effect of borrowing cost capitalisation
**) Mata uang asing lainnya disajikan dalam jumlah setara USD **) Other foreign currencies are presented as USD equivalent using the
menggunakan kurs tanggal pelaporan exchange rates prevailing at reporting date

Manajemen risiko tingkat suku bunga Interest rate risk management

Grup memiliki transaksi pada tingkat suku The Group has transactions at fixed and floating
bunga tetap dan tingkat suku bunga interest rates. Transactions at floating interest
mengambang. Transaksi dengan tingkat suku rates are exposed to cash flow interest rate risk.
bunga mengambang terekspos terhadap risiko Borrowing issued at fixed rates exposes the
suku bunga arus kas. Pinjaman yang diterbitkan Group to fair value interest risk. The Group
dengan tingkat suku bunga tetap mengekspos manages the risk by maintaining an appropriate
Grup dengan risiko suku bunga nilai wajar. mix of fixed and floating rate borrowings.
Grup mengelola risiko dengan
menyeimbangkan porsi pinjaman dengan bunga
tetap dan bunga mengambang.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/183 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL (lanjutan) CAPITAL RISK MANAGEMENT (continued)

c. Tujuan dan kebijakan manajemen risiko c. Financial risk management objectives and
keuangan (lanjutan) policies (continued)

Sensitivitas tingkat suku bunga Interest rate sensitivity

Analisis sensitivitas berikut telah ditentukan The sensitivity analysis below has been
berdasarkan eksposur Grup terhadap tingkat determined based on the Group’s exposure to
suku bunga untuk saldo instrumen keuangan interest rates for financial instruments after tax
terutang setelah pajak pada tanggal pelaporan. outstanding at the reporting date. The analysis is
Analisis ini disusun dengan mengasumsikan prepared assuming the amount of assets and
jumlah saldo aset dan liabilitas terutang pada liabilities outstanding at the end of the reporting
akhir tahun pelaporan, terutang sepanjang period was outstanding for the whole year. The
tahun. Analisis sensitivitas ini menggunakan sensitivity analysis uses an assumption of a 50
asumsi kenaikan dan penurunan sebesar 50 basis point (“bp”) increase and decrease in the
basis poin (“bp”) pada tingkat bunga yang relevant interest rates with all other variables held
relevan dengan variabel lain dianggap konstan. constant. A 50 bp increase or decrease
Kenaikan dan penurunan sebesar 50 bp represents management’s assessment of the
merupakan penilaian manajemen atas reasonably possible change in interest rates after
kemungkinan perubahan yang rasional considering the current economic conditions.
terhadap tingkat bunga setelah
mempertimbangkan kondisi ekonomi saat ini.

Dampak terhadap laba setelah pajak/


Effect to profit after tax
30 Juni 2023/ June 30, 2023
+50 bp -50bp

Aset Assets
Rekening dan deposito berjangka Restricted cash in banks and
dibatasi penggunaannya 20,806 (20,806) time deposits
Kas dan setara kas 116,588 (116,588) Cash & cash equivalents
Investasi jangka pendek 3,686 (3,686) Short-term investments
Subjumlah laba (rugi) 141,079 (141,079) Subtotal income (loss)

Liabilitas Liabilities
Penerusan pinjaman (114,185) 114,185 Two-step loans
Utang bank (515,862) 515,862 Bank loans
Subjumlah laba (rugi) (630,047) 630,047 Subtotal income (loss)
Total laba (rugi) (488,967) 488,967 Total income (loss)

Dampak terhadap
laba setelah pajak/
Effect to profit after tax
31 Desember/ December 31, 2022
+ 50 bp - 50 bp

Aset keuangan Financial assets


Kas dan setara kas 200,826 (200,826) Cash and cash equivalents
Rekening bank dan deposito berjangka Restricted cash in banks and
dibatasi penggunaannya 18,552 (18,552) time deposits
Investasi jangka pendek 2,080 (2,080) Short-term investments

Subjumlah laba/(rugi) 221,458 (221,458) Subtotal income/(loss)

Liabilitas Keuangan Financial Liabilities


Penerusan pinjaman (129,574) 129,574 Two-step loans
Utang bank (597,351) 597,351 Bank loans

Subjumlah (rugi)/laba (726,925) 726,925 Subtotal (loss)/income

Total (rugi)/laba (505,467) 505,467 Total (loss)/income


PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/184 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL (lanjutan) CAPITAL RISK MANAGEMENT (continued)

c. Tujuan dan kebijakan manajemen risiko c. Financial risk management objectives and
keuangan (lanjutan) policies (continued)

Manajemen risiko kredit Credit risk management

Risiko kredit mengacu pada risiko bahwa pihak Credit risk refers to the risk that the counterparties
ketiga akan gagal dalam memenuhi kewajiban will default on their contractual obligations
kontraktualnya yang mengakibatkan kerugian resulting in a loss to the Group. As a company
bagi Grup. Sebagai perusahaan yang diberikan that performs a public service obligation on behalf
kewajiban untuk melayani publik oleh of the Government of the Republic of Indonesia,
Pemerintah Republik Indonesia, Grup the Group is obliged to serve all customers
diwajibkan melayani semua pelanggan tanpa regardless of the ability to pay. In minimising the
melihat apakah nantinya akan bisa membayar risk of uncollected receivables, the Group collects
atau tidak. Dalam meminimalkan risiko tidak customer security deposits and will terminate the
tertagihnya piutang, Grup menerapkan uang electricity connection to the customer if a
jaminan pelanggan dan melakukan pemutusan customer does not make payment on time after
sambungan listrik ke pelanggan ditentukan jika three-months to minimise the Group’s credit risk.
pelanggan tidak membayar lewat dari tiga bulan For cash and cash equivalents, the Group
untuk meminimalkan risiko kredit. Untuk kas maintains accounts with several banks to avoid
dan setara kas, Grup mengelola rekening pada significant concentration of cash with one
beberapa bank untuk menghindari konsentrasi institution.
kas yang signifikan pada satu institusi.

Nilai tercatat aset keuangan pada laporan The carrying amount of financial assets recorded
keuangan konsolidasian setelah dikurangi in the consolidated financial statements, net of
dengan penyisihan untuk kerugian any allowance for losses represents the Group’s
mencerminkan eksposur Grup terhadap risiko exposure to credit risk. See Note 55.a for details.
kredit. Lihat Catatan 55.a untuk rinciannya.

Pada tanggal 30 Juni 2023 dan 31 Desember As at June 30, 2023 and December 31, 2022,
2022, jumlah maksimum eksposur dari risiko total maximum exposure from credit risk was
kredit adalah Rp116.596.434 (2022: Rp116,596,276 (2022: Rp107,248,068). Credit
Rp107.248.068). Risiko kredit terutama berasal risk arises from cash in banks, time deposits,
dari kas di bank, deposito berjangka, piutang trade receivables, receivables from Government,
usaha, piutang dari Pemerintah, piutang lain- other receivables, receivables from related
lain, piutang pihak berelasi, rekening bank parties, restricted cash in banks and short-term
dibatasi penggunaannya, dan investasi jangka investments.
pendek.

Kualitas kredit piutang usaha Credit quality of trade receivables

Grup berkeyakinan bahwa tidak ada risiko kredit The Group believes that there is no significant
kualitas signifikan yang terpusat karena piutang concentration of credit quality risk because its
usaha Grup tersebar merata atas jumlah trade receivables are spread over a large number
pelanggan yang besar yang meliputi berbagai of customers across diverse industries covering
jenis pelanggan baik ritel maupun industrial various types of customers, both retail and
yang tersebar di setiap wilayah geografis. Grup industrial, which are spread across a number of
juga melakukan evaluasi kredit berkelanjutan geographic areas. The Group also performs
atas piutang usaha secara berkala. Lihat ongoing credit evaluation of its trade receivables.
Catatan 15 untuk rincian umur piutang usaha See Note 15 for detailed information of the aging
dan penilaian penurunan nilai piutang usaha. of trade receivables and impairment assessment
of trade receivables.

Kualitas kredit piutang dari pemerintah Credit quality of receivables from Government

Grup berkeyakinan bahwa piutang dari The Group believes that receivables from
pemerintah dapat diterima sepenuhnya dalam Government can be fully recovered in time from
jangka waktu yang telah ditentukan dari the Government of the Republic of Indonesia. The
Pemerintah Republik Indonesia. Grup Group believes there is no risk of default by the
berkeyakinan bahwa tidak ada risiko gagal Government.
bayar oleh Pemerintah.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/185 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL (lanjutan) CAPITAL RISK MANAGEMENT (continued)

c. Tujuan dan kebijakan manajemen risiko c. Financial risk management objectives and
keuangan (lanjutan) policies (continued)

Manajemen risiko kredit (lanjutan) Credit risk management (continued)

Kualitas kredit kas di bank, deposito Credit quality of cash in banks, time deposits
berjangka dan rekening bank yang dibatasi and restricted cash in banks
penggunaannya

Grup menempatkan kas di bank, deposito The Group places cash in banks, time deposits
berjangka dan rekening bank yang dibatasi and restricted cash in banks with reputable
penggunaannya pada bank yang memiliki counterparties that have a good credit rating or
peringkat kredit yang baik. Oleh karena itu, standing. Consequently, the Group believes that
Grup berkeyakinan bahwa risiko kredit atas aset the credit risk of such financial assets is minimal.
keuangan ini adalah minimal. Pihak terkait yang These counterparties include large financial
dimaksud termasuk institusi keuangan utama institutions and SOEs.
dan BUMN.

Kualitas kredit piutang lainnya Credit quality of other receivables

Piutang lainnya ditagihkan kepada pihak Other receivables are to be collected from the
berelasi dan karyawan Grup. Oleh karena itu, Group’s related parties and employees.
Grup dapat memonitor kolektibilitas piutang- Therefore, the Group can closely monitor the
piutang ini dengan seksama. Grup memiliki collectability of these receivables. The Group has
tingkat kolektibilitas yang baik atas piutang- a good historical collection rate of these financial
piutang terkait. assets.

Manajemen risiko likuiditas Liquidity risk management

Risiko likuiditas didefinisikan sebagai risiko Liquidity risk is defined as the risk that the Group
bahwa Grup akan menghadapi kesulitan dalam will encounter difficulty in meeting its obligations
memenuhi kewajiban terkait dengan liabilitas associated with financial liabilities that are settled
keuangan yang diselesaikan dengan by delivering cash or another financial asset.
pembayaran kas atau aset keuangan lainnya. Ultimate responsibility for liquidity risk
Tanggung jawab utama manajemen risiko management rests with the Directors, which have
likuiditas terletak pada Direksi, yang telah built an appropriate liquidity risk management
membangun kerangka manajemen risiko framework for the management of the Group’s
likuiditas yang sesuai untuk persyaratan short, medium and long-term funding and liquidity
manajemen likuiditas dan pendanaan jangka management requirements. The Group manages
pendek, menengah dan panjang Grup. Grup liquidity risk by maintaining adequate cash,
mengelola risiko likuiditas dengan menjaga reserves, banking facilities and reserve borrowing
kecukupan kas, simpanan, fasilitas bank dan facilities by continuously monitoring forecast and
cadangan fasilitas pinjaman dengan terus actual cash flows and matching the maturity
menerus memonitor perkiraan dan realisasi profiles of financial liabilities.
arus kas dan mencocokkan profil jatuh tempo
liabilitas keuangan.

Selanjutnya Grup juga memelihara kecukupan In addition, the Group maintains an adequate
dana dengan cara mempertahankan kecukupan amount of cash and cash equivalents and short-
jumlah kas dan setara kas dan investasi jangka time investments, which may be readily converted
pendek yang mudah dikonversi menjadi uang to cash should there be any unforeseen
tunai ketika mengalami gangguan yang tak interruption to its cash collections.
terduga dari penagihan kas.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/186 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL (lanjutan) CAPITAL RISK MANAGEMENT (continued)

c. Tujuan dan kebijakan manajemen risiko c. Financial risk management objectives and
keuangan (lanjutan) policies (continued)

Manajemen risiko likuiditas (lanjutan) Liquidity risk management (continued)

Tabel dibawah ini menganalisis liabilitas The table below analyses the Group’s financial
keuangan Grup pada tanggal pelaporan liabilities at the reporting date into relevant
berdasarkan kelompok jatuh temponya dari sisa maturity groupings based on the remaining period
periode hingga tanggal jatuh tempo kontraktual. to the contractual maturity date. The amount
Jumlah yang diungkapkan dalam tabel ini disclosed in the table represent contractual
adalah nilai arus kas kontraktual yang tidak undiscounted cash flows including estimated
didiskonto termasuk estimasi pembayaran interest payments.
bunga.

30 June/ June 30, 2023


Lebih dari satu tahun Lebih dari tiga tahun
tetapi tidak lebih tetapi tidak lebih
dari tiga tahun/ dari lima tahun/
Kurang dari satu tahun/ Over one year but not Over three years but not Lebih dari lima tahun/ Jumlah/
Less than one year longer than three years longer than five years Over five years Total

Liabilitas Liabilities
Penerusan pinjaman 3,733,387 7,353,209 6,810,364 17,169,537 35,066,497 Two-step loans
Utang kepada Pemerintah Government and
dan lembaga keuangan non-bank Government
Pemerintah non-bank 870,148 1,619,875 332,854 10,601 2,833,479 financial institution loans
Utang sewa 7,364,484 12,556,279 10,471,566 19,846,368 50,238,698 Lease liabilities
Utang bank 33,287,287 49,910,868 31,267,876 48,184,132 162,650,162 Bank loans
Utang obligasi dan sukuk ijarah 13,562,844 34,316,991 59,766,959 226,896,364 334,543,157 Bonds payable and sukuk ijara
Utang listrik swasta 871,688 1,733,355 1,731,626 3,151,420 7,488,090 Electricity purchase payable
Utang usaha 54,865,099 -- -- -- 54,865,099 Trade payables
Uang jaminan langganan 17,066,715 -- -- -- 17,066,715 Customers' security deposits
Utang biaya proyek 1,821,974 -- -- -- 1,821,974 Project cost payable
Biaya masih harus dibayar 7,761,301 -- -- -- 7,761,301 Accrued expenses
Utang lain-lain 14,698,052 756,880 -- -- 15,454,932 Other payables

Jumlah 155,902,979 108,247,457 110,381,245 315,258,423 689,790,105 Total

31 Desember/ December 31, 2022


Lebih dari satu tahun Lebih dari tiga tahun
tetapi tidak lebih tetapi tidak lebih
Kurang dari dari tiga tahun/ dari lima tahun/
satu tahun/ More than one year More than three years Lebih dari
Less than but not longer than but not longer than lima tahun/ Jumlah/
one year three years five years More than five years Total

Liabilitas keuangan Financial liabilities


Penerusan pinjaman 4,158,660 11,452,687 6,742,774 16,299,071 38,653,192 Two-step loans
Utang kepada Pemerintah dan Government and non-bank
lembaga keuangan Government financial
Pemerintah non-bank 927,625 2,427,188 - - 3,354,813 institution loans
Utang sewa 5,230,840 3,680,822 2,166,817 6,904,222 17,982,701 Lease liabilities
Utang bank 37,581,237 76,433,576 25,628,730 42,756,881 182,400,424 Bank loans
Utang obligasi Bonds payable
dan sukuk ijarah 15,595,849 47,781,747 59,996,183 236,847,792 360,221,571 and sukuk ijara
Utang listrik swasta 916,810 1,833,619 1,833,619 3,757,672 8,341,720 Electricity purchase payables
Utang usaha 51,083,262 - - - 51,083,262 Trade payables
Uang jaminan langganan 16,539,411 - - - 16,539,411 Customer security deposits
Utang biaya proyek 2,096,511 - - - 2,096,511 Project cost payables
Biaya masih harus dibayar 7,353,802 - - - 7,353,802 Accrued expenses
Utang lain-lain 13,016,633 671,526 - - 13,688,159 Other payables

Jumlah 154,500,640 144,281,165 96,368,123 306,565,638 701,715,566 Total

Manajemen berkeyakinan bahwa tidak terdapat Management believes that there will be no
masalah likuiditas karena Grup memiliki cadangan liquidity issue as the Group has sufficient
fasilitas kredit yang memadai, adanya jaminan standby credit facilities, government
Pemerintah untuk pembayaran utang bank terkait, guarantees for related debt repayment and
dan pendapatan subsidi dari Pemerintah subsidy revenue from the Government of
Indonesia atas penyediaan listrik. Indonesia for provision of electricity.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/187 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL (lanjutan) CAPITAL RISK MANAGEMENT (continued)

d. Nilai wajar instrumen keuangan d. Fair value of financial instruments

Nilai wajar adalah suatu jumlah dimana suatu The fair value is the amount for which an asset
aset dapat dipertukarkan atau suatu liabilitas could be exchanged or a liability settled between
diselesaikan antara pihak yang memahami dan knowledgeable and willing parties in an arm’s
berkeinginan untuk melakukan transaksi wajar. length transaction.

Nilai wajar aset dan liabilitas keuangan The fair value of financial assets and liabilities is
diestimasi untuk keperluan pengakuan, estimated for recognition and measurement or for
pengukuran atau untuk keperluan disclosure purposes.
pengungkapan.

PSAK No. 68, “Pengukuran nilai wajar”, SFAS No. 68, “Fair value measurement”, requires
mensyaratkan pengungkapan atas pengukuran disclosure of fair value measurements through
nilai wajar dengan tingkat hierarki nilai wajar the following fair value measurement hierarchy:
sebagai berikut:

- Harga kuotasian (tidak disesuaikan) dalam - Quoted prices (unadjusted) in active markets
pasar aktif untuk aset atau liabilitas yang for identical assets or liabilities (Level 1);
identik (Tingkat 1);
- Input selain harga kuotasian dari pasar yang - Inputs other than quoted prices included within
termasuk dalam Tingkat 1 yang dapat Level 1 that are observable for the asset or
diobservasi untuk aset atau liabilitas, baik liability, either directly (that is, as prices) or
secara langsung (misalnya harga) atau indirectly (that is, derived from prices) (Level
secara tidak langsung (misalnya turunan 2); and
dari harga) (Tingkat 2); dan
- Input untuk aset atau liabilitas yang bukan - Inputs for the asset or liability that are not
berdasarkan data pasar yang dapat based on observable market data (that is,
diobservasi (informasi yang tidak dapat unobservable inputs) (Level 3).
diobservasi) (Tingkat 3).

Tabel di bawah ini menggambarkan nilai The table below describes the carrying amount of
tercatat dan nilai wajar dari liabilitas keuangan the financial liabilities that are not presented by
yang tidak disajikan Grup pada nilai wajarnya: the Group at fair value:

30 Juni/June 30, 2023 31 Desember/December 31, 2022


Nilai Tercatat / Nilai Wajar/ Nilai Tercatat / Nilai Wajar/
Carrying amount Fair value Carrying amount Fair value
Liabilitas pada biaya perolehan
diamortisasi Liabilities at amortised cost
Penerusan pinjaman 29,278,078 28,113,333 33,184,714 32,314,374 Two-step loans
Utang kepada Pemerintah dan Government and non-bank
lembaga keuangan Government financial
Pemerintah non-bank 2,901,057 2,667,862 3,354,591 3,050,783 institution loans
Utang obligasi dan sukuk ijarah 194,345,153 182,658,927 201,334,421 190,047,327 Bonds payable and sukuk ijara
Utang bank 132,272,346 131,304,601 152,410,118 151,549,712 Bank loans

Penerusan pinjaman dan utang bank Two-step loans and bank loans are financial
merupakan liabilitas keuangan dengan tingkat liabilities with floating interest rates, thus the
bunga mengambang, sehingga nilai tercatat carrying amount of the financial liabilities
setara dengan nilai wajar. approximate their fair values.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/188 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO 55 FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
KEUANGAN DAN RISIKO MODAL (lanjutan) CAPITAL RISK MANAGEMENT (continued)

d. Nilai wajar instrumen keuangan (lanjutan) d. Fair value of financial instruments (continued)

Beberapa pinjaman dengan suku bunga tetap, Certain loans with fixed interest rates, the carrying
nilai tercatat atas liabilitas keuangan tidak amount of the financial liabilities does not
menunjukkan nilai wajarnya, sehingga pada represent their fair values, thus as at June 30
tanggal 30 Juni 2023 dan 31 Desember 2022, 2023 and December 31, 2022, the fair value of
nilai wajar atas pinjaman diukur dengan loans is measured using discounted cash flows
mendiskontokan estimasi arus kas masa depan based on the interest rate based on credit
menggunakan suku bunga pasar dengan adjusted market interest rates at the reporting
penyesuaian kredit pada tanggal pelaporan. date. The fair values of the above financial
Nilai wajar instrumen keuangan di atas instruments are classified as Level 2 fair values in
diklasifikasikan sebagai nilai wajar Tingkat 2 the fair value hierarchy.
dalam hirarki nilai wajar.

Nilai wajar dari utang obligasi, ditentukan The fair value of bonds payable is determined by
dengan mengacu pada harga kuotasian dalam the quoted market price at the reporting date. The
pasar aktif pada tanggal pelaporan. Nilai wajar fair values of the bonds payable is classified as
utang obligasi di atas diklasifikasikan sebagai Level 1 fair values in the fair value hierarchy.
nilai wajar Tingkat 1 dalam hirarki nilai wajar.

Pada tanggal 30 Juni 2023 dan 31 Desember As at June 30, 2023 and December 31, 2022, the
2022, instrumen keuangan derivatif dihitung derivative financial instruments are measured
menggunakan Tingkat 2. Nilai wajar diukur using a Level 2 method. The fair value is
pada nilai tunai estimasi arus kas masa depan measured as the present value of the estimated
berdasarkan kurva pendapatan yang dapat future cash flows based on observable yield
diobservasi. curves.

Nilai tercatat dari aset dan liabilitas keuangan The carrying amount of other financial assets and
lainnya telah berkisar menunjukkan nilai liabilities approximate their fair values due to the
wajarnya karena memiliki sifat jangka pendek short-term nature of the financial instruments.
dari instrumen keuangannya.

Untuk periode yang berakhir pada tanggal 30 For the periods ended June 30, 2023 and
Juni 2023 dan 31 Desember 2022, tidak December 31, 2022, there were no transfers
terdapat pengalihan antar tingkat. between levels.

56. ASET/(LIABILITAS) DERIVATIF 56. DERIVATIVE ASSETS/(LIABILITIES)

Perusahaan melaksanakan hedging terbatas untuk The Company has implemented limited hedging on
memitigasi risiko selisih kurs atas transaksi- certain transactions to mitigate its foreign currency
transaksi tertentu. Jenis transaksi hedging yang exposure. The type of hedge transaction is a currency
dilaksanakan adalah kontrak-kontrak currency forward contract with details as at June 30, 2023 and
forward dengan jumlah rincian pada 30 Juni 2023 December 31, 2022, as follows:
dan 31 Desember 2022 adalah sebagai berikut:

30 Juni/ June 30, 2023


Liabilitas
Pihak lawan/ Jangka waktu hedging/ Jumlah notional (USD)/ derivatif/Derivative
Counterparties Hedging periods Notional amount (USD) liabilities*)

BRI < 1 Bulan/Month 75,000,000 6,767


Mandiri < 1 Bulan/Month 40,000,000 3,944
BNI < 1 Bulan/Month 20,000,000 1,995
Mandiri > 1 Bulan/Month 640,000,000 40
BRI > 1 Bulan/Month 725,000,000 (8,503)
BNI > 1 Bulan/Month 120,000,000 3,088

Jumlah/Total 1,620,000,000 7,331


*) dalam jutaan Rupiah/in IDR million
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/189 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

56. ASET/(LIABILITAS) DERIVATIF (lanjutan) 56. DERIVATIVE ASSETS/(LIABILITIES) (continued)

31 Desember/ December 31, 2022


Liabilitas
Pihak lawan/ Jangka waktu hedging/ Jumlah notional (USD)/ derivatif/Derivative
Counterparties Hedging periods Notional amount (USD) liabilities*)

BRI < 1 Bulan/Month 15,000,000 (445)


Mandiri < 1 Bulan/Month 35,000,000 (1,989)
Mandiri > 1 Bulan/Month 550,000,000 21,622
BRI > 1 Bulan/Month 765,000,000 78,634
BNI > 1 Bulan/Month 95,000,000 9,246

Jumlah/Total 1,460,000,000 107,068


*) dalam jutaan Rupiah/in IDR million

57. INFORMASI TAMBAHAN TERKAIT PENERAPAN 57. ADDITIONAL INFORMATION RELATED TO


POJK NO. 6 IMPLEMENTATION OF POJK NO. 6

Sejak 1 Januari 2016, Perusahaan menerapkan Since January 1, 2016, the Company has
secara prospektif POJK No. 6 untuk transaksi implemented POJK No. 6 prospectively for
berdasarkan Perjanjian Jual Beli Tenaga Listrik transactions based on Power Purchase Agreements
dengan IPP. Dampak penerapan POJK No. 6 telah with IPPs. The effect of POJK No. 6 implementation
disesuaikan ke saldo laba 1 Januari 2016 (Catatan has been accounted for by adjustment to retained
2.a). earnings as at January 1, 2016 (Note 2.a).

Sesuai POJK No. 6, setiap transaksi berdasarkan In accordance with POJK No. 6, all transactions based
Perjanjian Jual Beli Tenaga Listrik diperlakukan on Power Purchase Agreements are treated as sale
sebagai transaksi jual beli, meskipun sebenarnya and purchase transactions, although containing a
mengandung substansi selain jual beli (Catatan 3.k). substance other than sale and purchase (Note 3.k).
Tabel berikut ini disajikan sebagai informasi The following tables are presented as additional
tambahan jika perjanjian jual beli listrik dianggap information if PPAs were deemed to contain a lease.
mengandung sewa.

Dengan / Under Dengan / Under


PSAK/SFAS PSAK/SFAS
No 73 2021 No 73 2021
30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

Laporan posisi keuangan konsolidasian interim Interm Consolidated statement of financial position

Aset tidak lancar Noncurrent assets


Aset tetap - bersih 1,643,670,584 1,630,489,082 PPE - nett

Ekuitas Equity
Saldo laba - belum ditentukan penggunaannya 41,239,266 22,288,575 Retained earnings - Unappropriated

Liabilitas Jangka panjang Noncurrent liabilities


Utang sewa 300,845,795 296,951,467 Lease liabilities
Utang listrik swasta 4,567,092 5,003,716 Electricity purchase payable
Liabilitas pajak tangguhan 32,114,519 26,710,470 Deferred tax liabilities

Liabilitas jangka pendek Current liabilities


Utang usaha Trade payable
Pihak berelasi 13,505,587 14,734,214 Related parties
Pihak ketiga 37,227,439 33,839,527 Third parties
Biaya masih harus dibayar 11,406,595 9,505,157 Accrued expense
Utang listrik swasta 487,433 494,649 Electricity purchase payable
Utang sewa 12,255,009 13,318,281 Lease liabilities
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/190 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

57. INFORMASI TAMBAHAN TERKAIT PENERAPAN 57. ADDITIONAL INFORMATION RELATED TO


POJK NO. 6 (lanjutan) IMPLEMENTATION OF POJK NO. 6 (continued)

Dengan / Under Dengan / Under


PSAK/SFAS PSAK/SFAS
No. 73 No. 73
30 Juni/ 30 Juni/
June 30, June 30,
2023 2022
Laporan laba rugi komprehensif konsolidasian interim Consolidated statement of comprehensive income
Beban usaha: Operating expense
Bahan bakar dan pelumas 102,741,535 88,346,906 Fuel expense
Pembelian tenaga listrik 7,472,782 5,131,581 Electricity purchase
Sewa 966,423 2,064,689 Lease
Pemeliharaan 18,256,492 14,135,804 Maintenace
Penyusutan 26,337,350 24,151,515 Depreciation
Penyusutan Hak guna 1,386,009 -

Laba usaha 57,656,151 61,204,305 Operating income


Penghasilan keuangan Financial Income
Pendapatan lain-lain (107,732) - Others income (expense) - net
Keuntungan (kerugian) kurs mata uang asing - bersih 21,865,106 (15,240,136) Gain (loss) on Foreign Exchange
Pendapatan keuangan (37,356,152) (34,969,661) Finance income

Laba sebelum pajak 42,529,606 11,803,487 Income b efore tax


Beban pajak (9,217,916) (2,304,923) Tax expense

Laba periode berjalan 33,311,690 9,489,564 Income for the period

Laporan arus kas konsolidasian interim Consolidated statement of comprehensive income

Arus kas dari aktivitas operasi Cash from operating activities


Pembayaran kas kepada pemasok (135,236,233) (116,919,363) Cash paid to suppliers
Kas diperoleh dari aktifitas operasi 16,538,856 31,455,150
Pembayaran bunga (35,223,844) (32,953,328) Interest expense paid
Kas bersih dari aktifitas operasi 25,293,278 18,517,373 Net cash provided b y operating activities

Arus kas dari aktivitas pendanaan Cash from financing activities


Pembayaran utang listrik swasta (217,589) (208,646) Payment of electricity purchase payab le
Pembayaran utang sewa pembiayaan (5,260,137) (5,195,837) Payment of finance lease
Kas bersih dari aktifitas pendanaan (24,125,448) (9,504,845) Net cash provided b y financing activities

Nilai kini pembayaran minimum atas utang sewa The present value of minimum lease payments on
pada tanggal 30 Juni 2023 dan 31 Desember 2022 lease liabilities as at June 30, 2023 and December
jika Grup menerapkan PSAK No. 73, “Sewa” adalah 31, 2022, if the Group applied SFAS No. 73,
sebagai berikut: “Leases” are as follows:
30 Juni/ 31 Desember/
June 30, December 31,
2023 2022

a. Berdasarkan jatuh tempo a. By due date

Pembayaran jatuh tempo dalam waktu : Minimum lease payments due :


Tidak lebih dari 1 tahun 61,381,953 63,120,975 Not later than 1 year
Antara lebih dari 1 tahun sampai Later than 1 year and not later than
5 tahun 216,644,724 225,347,594 5 years
Lebih dari 5 tahun 634,321,556 687,961,006 Later than 5 years
Jumlah pembayaran minimum
sewa pembiayaan 912,348,233 976,429,575 Total minimum lease payments
Dikurangi bunga 617,336,821 666,961,006 Less interest
Nilai tunai pembayaran minimum Present value of future minimum
sewa pembiayaan masa datang 295,011,411 310,269,748 lease payments
Dikurangi bagian jatuh tempo dalam
satu tahun 11,764,760 13,318,281 Less current maturity
Bagian jangka panjang 283,246,651 296,951,467 Long-term portion
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/191 Schedule

CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED


KONSOLIDASIAN FINANCIAL STATEMENTS
30 JUNI 2023 DAN 31 DESEMBER 2022 JUNE 30, 2023 AND DECEMBER 31, 2022
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain) (Expressed in millions of Rupiah, unless otherwise stated)

58. REKLASIFIKASI 58. RECLASSIFICATION

Laporan keuangan konsolidasian per 30 Juni The consolidated financial statements as of June 30, 2022
2022 telah direklasifikasi agar konsisten have been reclassified to be consistent with the
dengan presentasi laporan keuangan presentation of the June 30, 2023 consolidated financial
konsolidasian per 30 Juni 2023. Rincian akun- statements. The details of the accounts being reclassified
akun yang direklasifikasi adalah sebagai are as follows:
berikut:

Sebelum Setelah
reklasifikasi/ reklasifikasi/
Before Reklasifikasi/ After
reclassifications Reclassifications reclassifications

Consolidated statement of
Laporan laba rugi konsolidasian profit or loss

Beban usaha Operating Expenses

Sewa
(1,930,876) (42,843) (1,973,719) Lease
Pemeliharaan
(9,790,204) (614,266) (10,404,470) Maintenance

Lain-lain (3,694,740) 657,109 (3,037,631) Others

Reklasifikasi di atas tidak berdampak secara The above reclassifications have no material impact
material karena reklasifikasi ini tidak mempengaruhi because the reclassifications do not affect economic
keputusan ekonomis yang dibuat oleh pengguna decisions made by users on the basis of consolidated
atas dasar laporan keuangan konsolidasian financial statements and therefore a restatement of the
sehingga penyajian kembali laporan keuangan three-period consolidated financial statements is not
konsolidasian tiga periode tidak diperlukan. necessary.

59. TANGGUNG JAWAB MANAJEMEN DAN 59. MANAGEMENT’S RESPONSIBILITY FOR AND
PERSETUJUAN ATAS LAPORAN KEUANGAN APPROVAL OF THE CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS

Penyusunan dan penyajian wajar laporan keuangan The preparation and fair presentation of the
konsolidasian merupakan tanggung jawab consolidated financial statements is the responsibility
manajemen dan telah disetujui oleh Direksi untuk of the management and the Directors have approved
diterbitkan pada tanggal 28 Juli 2023. them for issuance on July 28, 2023.

Anda mungkin juga menyukai