I PEKERJAAN PENDAHULUAN
II PEKERJAAN BETON
III PEKERJAAN DINDING
IV PEKERJAAN KAP/ATAP
V PEKERJAAN PLAFOND
VI PEKERJAAN PLESTERAN
JUMLAH -
JUMLAH BOBOT - - - - - - -
BOBOT RENCANA 0 - - - - - - -
BOBOT CEPAT
BOBOT LAMBAT
84
CHEDULLE
90
80
70
60
50
40
30
20
10
- - - - -
- - - - -
0
0
Kode Balok 1 Input
Kode Kolom 2 Output Awal
Kode Pelat 3 Output Final
TULANGAN POKO
STRUKTUR
Kode
4600.5
RK
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
REKAPITULASI BIAYA
KEGIATAN :
PEKERJAAN : REHAP RUANG KELAS MTsN 4
LOKASI : MTs N 4 KEC. BONJOL KAB. PASAMAN
NO URAIAN PEKERJAAN
GEDUNG 1
I PEKERJAAN PENDAHULUAN
II PEKERJAAN BETON
IV PEKERJAAN KAP/ATAP
V PEKERJAAN PLAFOND
VI PEKERJAAN PLESTERAN
IX PEKERJAAN PENGECATAN
GEDUNG 2
I PEKERJAAN PENDAHULUAN
II PEKERJAAN BETON
IV PEKERJAAN KAP/ATAP
V PEKERJAAN PLAFOND
VI PEKERJAAN PLESTERAN
VII PEKERJAAN LANTAI
IX PEKERJAAN PENGECATAN
TOTAL J
Terbilang
P
Diperiksa / Disetujui Oleh :
KUASA PENGGUNA ANGGARAN
(KPA)
PITULASI BIAYA
AAN JUMLAH
16,165,147.00
3,149,503.57
12,145,277.78
111,275,537.73
53,245,790.14
19,218,063.22
94,896,263.04
41,378,517.67
104,960,700.82
5,287,315.00
461,722,115.96
Err:509
Err:509
-
-
JUMLAH 461,722,115.96
PPn 10 % 46,172,211.60
PEMBULATAN 507,894,000.00
/M2
507,894,000.00
(507,894,000.00)
RENCANA ANGGARAN
KEGIATAN : -
PEKERJAAN : REHAP RUANG KELAS MTsN 4
a b c
GEDUNG I
I PEKERJAAN PENDAHULUAN
1 Pek Bongkaran Rangka Atap M3
2 Pek Bongkaran Plafond M3
3 Pek Bongkaran Keramik M3
4 Pek Bongkaran Kusen, Daun Pintu, Dan Jendela Ls
5 Pek Buang Hasil Bongkaran keluar Area Skolah Ls
II PEKERJAAN BETON
A Pek. Kolom 15/15 cm Praktis
1 Beton 1:2:3 M3
2 Pembesian Kg
3 Cetakan 2 x pakai M2
IV PEKERJAAN KAP/ATAP
1 Pek. Rangka Atap Baja Ringan M2
2 Pek. Pas. List Plank Papan M1
3 Pek. Pas. Atap Seng Gelombang Warna M2
4 Pas. Perabung Seng Plat M'
5 Pas. Bola-bola Atap M'
V PEKERJAAN PLAFOND
1 Pek. Rangka Plafond M2
2 Pek. Plafond Triplek Tebal 4 Mm M2
3 Pas. List Plafond 1x2x400 Cm M'
4 List Profil Sudut 3x3,5x400 Cm M'
VI PEKERJAAN PLESTERAN
1 Plesteran 1:2 M2
2 Plesteran 1:4 M2
3 Acian 1 M2 M2
IX PEKERJAAN PENGECATAN
1 Mencat Kayu Yang Kelihatan dgn Cat Minyak M2
2 Mencat Daun Pintu, Jendela dan Jalusi dgn Cat Minyak M2
3 Mencat Dinding dgn Cat Tembok M2
4 Mencat Plafond dgn Cat Tembok M2
GEDUNG 2
I PEKERJAAN PENDAHULUAN
1 Pek Bongkaran Rangka Atap Ls
2 Pek Bongkaran Plafond Ls
3 Pek Bongkaran Keramik Ls
II PEKERJAAN BETON
A Pek. Kolom 15/15 cm Praktis
1 Beton 1:2:3 M3
2 Pembesian Kg
3 Cetakan 2 x pakai M2
IV PEKERJAAN KAP/ATAP
1 Pek. Rangka Atap M2
2 Pek. Pas. List Plank Papan M1
3 Pek. Pas. Atap Seng Gelombang Warna M2
4 Pas. Perabung Seng Plat M'
5 Pas. Bola-bola Atap M'
V PEKERJAAN PLAFOND
1 Pek. Rangka Plafond M2
2 Pek. Plafond Triplek Tebal 4 Mm M2
3 Pas. List Plafond 1x2x400 Cm M'
4 List Profil Sudut 3x3,5x400 Cm M'
VI PEKERJAAN PLESTERAN
1 Plesteran 1:2 M2
2 Plesteran 1:4 M2
3 Afwerking Beton M2
IX PEKERJAAN PENGECATAN
1 Mencat Kayu Yang Kelihatan dgn Cat Minyak M2
2 Mencat Daun Pintu, Jendela dan Jalusi dgn Cat Minyak M2
3 Mencat Dinding dgn Cat Tembok M2
4 Mencat Plafond dgn Cat Tembok M2
-
-
-
-
-
-
Jumlah
-
-
-
Jumlah
-
-
-
-
-
Jumlah -
-
-
Jumlah -
-
-
-
-
-
Jumlah -
-
-
-
-
Jumlah -
-
-
-
Jumlah -
-
-
Jumlah -
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
-
-
-
-
Jumlah -
-
-
-
-
-
-
Jumlah -
Pasaman, Desember 2018
Dibuat Oleh :
-
-
-
BOBOT
0.58
0.58
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KECAMATAN PANTI KAB. PASAMAN
PROV. SUMATERA BARAT
1 2 3
II. B A H A N
A. BATU - BATUAN
1 Batu Kali
a Batu Bulat Utuh M³
b Batu Pecah 5/7 M³
c Batu Pecah 3/4 M³
2 Kerikil
a Kerikil Beton M³
b M³
c M³
3 Pasir
a Pasir Pasang M³
b Pasir Ayak Untuk Beton M³
c Pasir Urug/Pasir Timbunan M³
d Tanah Urug/Cadas M³
IV BAHAN KAYU
1 Kayu Kls I : Papan M³
(Kelas I ) Balok M³
2 Kayu Kls II : Papan M³
( Kelas II ) Balok M³
3 Kayu KLs III : Papan M³
( Kelas III ) Balok M³
4 Kayu Bekisting : Papan M³
( Kelas IV ) Balok M³
5 Kayu dolken Ø 5 - 10 cm panjang 400cm Btg
6 Kayu Kaso 5/7 M3
7 Papan Terentang M³
8 List Kayu profil 3 x 3,5 x 400 cm Btg
9 Lem Kayu Kg
V TRIPLEK / BAHAN LOTENG
1 Triplek Tebal 3 mm Lbr
2 Triplek Tebal 4 mm Lbr
3 Triplek Tebal 6 mm Lbr
4 Triplek Tebal 9 mm Lbr
Bahan Besi
1 Besi Beton Kg
Bahan Paku
1 1 " Kg
2 1 1/2 " Kg
3 ( 2 - 5 )" Kg
4 Paku Seng Kg
5 Paku Triplek Kg
Keramik Dinding
- ukuran 20 x 25 cm M2
IX BAHAN KACA
- Kaca Polos
- Tebal 3 mm M2
- Tebal 5 mm M2
- Tebal 6 mm M2
- Sealant Kg
X BAHAN ASPALT DAN BAHAN TERAKIT LAINNYA
- Residu/Minyak Bekisting Ltr
- Air M3
-
XI PENGGANTUNG / PENGUNCI
Kunci Pintu Tanam
- Kunci Tanam (lokal) Set
- Kunci KM Set
- Engsel Pintu Set
- Engsel Jendela Kupu-kupu Set
- Hak Angin Set
- Grendel Jendela Set
- Grendel Pintu Set
- Tarikan Jendela Set
- Tarikan Pintu Set
4 5
140,000.00
125,000.00
125,000.00
125,000.00
125,000.00
125,000.00
150,000.00
85,000.00
150,000.00
155,000.00
165,000.00
145,000.00 107.41
159,000.00 113.57
159,000.00 113.57
110,000.00
137,000.00
750.00
3,850.00
3,000.00
62,000.00
1,240.00
10,000.00
15,000.00
3,000,000.00
3,000,000.00
2,400,000.00
2,300,000.00
2,150,000.00
2,150,000.00
2,000,000.00
2,000,000.00
10,000.00
2,400,000.00
2,000,000.00
15,000.00
12,000.00
58,000.00
70,000.00
88,000.00
118,000.00
175,000.00
20,000.00
20,000.00
30,000.00
10,500.00
20,000.00
24,000.00
20,000.00
25,000.00
15,000.00
48,000.00
36,000.00
25,000.00
95,000.00
45,000.00
250.00
250.00
19,000.00
30,000.00
107,000.00 4,280.00
109,000.00 9,909.09
110,000.00 17,600.00
65,000.00
70,000.00
77,000.00
98,000.00
15,000.00
10,000.00
18,000.00 18
100,000.00
80,000.00
20,000.00
10,000.00
15,000.00
15,000.00
10,000.00
25,000.00
550,000.00
60,000.00
60,000.00
50,000.00
35,000.00
35,000.00
8,000.00
20,000.00
250,000.00
15,000.00
10,000.00
25,000.00
8,000.00
220,000.00
240,000.00
100,000.00
15,000.00
12,000.00
Pasaman, Desember 2018
Dibuat Oleh :
0
0
0
ANALISA HARGA SATUAN PEKERJAAN BIDANG CIP
A TENAGA
Pekerja L.01 OH 0.1000
Mandor L.04 OH 0.0500
JUMLAH TENAGA KER
B BAHAN
A TENAGA
Pekerja L.01 OH 6.6670
Mandor L.04 OH 0.3330
JUMLAH TENAGA KER
B BAHAN
A TENAGA
Pekerja L.01 OH 0.7500
Mandor L.04 OH 0.0250
JUMLAH TENAGA KER
B BAHAN
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
JENIS PEKERJAAN : A.2.3.1.9 Pengurugan kembali 1 m3 galian tana
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 55,000.00
A TENAGA
Pekerja L.01 OH 0.5000
Mandor L.04 OH 0.0500
JUMLAH TENAGA KER
B BAHAN
A TENAGA
Pekerja L.01 OH 1.5000
Tukang L.02 OH 0.7500
Kepala tukang L.03 OH 0.0750
Mandor L.04 OH 0.0750
JUMLAH TENAGA KER
B BAHAN
Batu belah m3 1.2000
Semen Portland Kg 163.0000
Pasir Pasang m3 0.5200
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.7800
Tukang Batu L.02 OH 0.3900
Kepala tukang L.03 OH 0.0390
Mandor L.04 OH 0.0390
JUMLAH TENAGA KER
B BAHAN
Batu belah m3 1.2000
Pasir urug m3 0.4320
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.6500
Tukang Batu L.02 OH 0.2750
Kepala tukang L.03 OH 0.0280
Mandor L.04 OH 0.0830
JUMLAH TENAGA KER
B BAHAN
Semen Portland Kg 247.0000
Pasir beton Kg 869.0000
Kerikil (Maks 30 mm) Kg 999.0000
Air Liter 215.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.6500
Tukang Batu L.02 OH 0.2750
Kepala tukang L.03 OH 0.0280
Mandor L.04 OH 0.0830
JUMLAH TENAGA KER
B BAHAN
Semen Portland Kg 276.0000
Pasir beton Kg 828.0000
Kerikil (Maks 30 mm) Kg 1012.0000
Air Liter 215.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.6500
Tukang Batu L.02 OH 0.2750
Kepala tukang L.03 OH 0.0280
Mandor L.04 OH 0.0830
JUMLAH TENAGA KER
B BAHAN
Semen Portland Kg 299.0000
Pasir beton Kg 799.0000
Kerikil (Maks 30 mm) Kg 1017.0000
Air Liter 215.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.2000
Tukang Batu L.02 OH 0.2000
Kepala tukang L.03 OH 0.0200
Mandor L.04 OH 0.0600
JUMLAH TENAGA KER
B BAHAN
Semen Portland Kg 230.0000
Pasir beton Kg 893.0000
Kerikil (Maks 30 mm) Kg 1027.0000
Air Liter 200.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.6500
Tukang Batu L.02 OH 0.2750
Kepala tukang L.03 OH 0.0280
Mandor L.04 OH 0.0830
JUMLAH TENAGA KER
B BAHAN
Semen Portland Kg 326.0000
Pasir beton Kg 760.0000
Kerikil (Maks 30 mm) Kg 1029.0000
Air Liter 215.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0700
Tukang L.02 OH 0.0700
Kepala tukang L.03 OH 0.0070
Mandor L.04 OH 0.0040
JUMLAH TENAGA KER
B BAHAN
Besi beton Kg 10.5000
Kawat beton Kg 0.1500
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.5200
Tukang L.02 OH 0.2600
Kepala tukang L.03 OH 0.0260
Mandor L.04 OH 0.0260
JUMLAH TENAGA KER
B BAHAN
Kayu kelas III m3 0.0450
Paku 5 - 10 Cm Kg 0.3000
Minyak bekisting Liter 0.1000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.6600
Tukang L.02 OH 0.3300
Kepala tukang L.03 OH 0.0330
Mandor L.04 OH 0.0330
JUMLAH TENAGA KER
B BAHAN
Kayu kelas III m3 0.0400
Paku 5 - 10 Cm Kg 0.4000
Minyak bekisting Liter 0.2000
Balok kayu kelas II m3 0.0150
Plywod tebal 9 mm Lbr 0.3500
Dolken kayu φ 8-10 Cm Batang 2.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.6600
Tukang L.02 OH 0.3300
Kepala tukang L.03 OH 0.0330
Mandor L.04 OH 0.0330
JUMLAH TENAGA KER
B BAHAN
Kayu kelas III m3 0.0400
Paku 5 - 10 Cm Kg 0.4000
Minyak bekisting Liter 0.2000
Balok kayu kelas II m3 0.0180
Plywod tebal 9 mm Lbr 0.3500
Dolken kayu φ 8-10 Cm Batang 2.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.6600
Tukang L.02 OH 0.3300
Kepala tukang L.03 OH 0.0330
Mandor L.04 OH 0.0330
JUMLAH TENAGA KER
B BAHAN
Kayu kelas III m3 0.0400
Paku 5 - 10 Cm Kg 0.4000
Minyak bekisting Liter 0.2000
Balok kayu kelas II m3 0.0150
Plywod tebal 9 mm Lbr 0.3500
Dolken kayu φ 8-10 Batang 6.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1800
Tukang Batu L.02 OH 0.0200
Tukang kayu L.02 OH 0.0200
Tukang besi L.02 OH 0.0200
Kepala tukang L.03 OH 0.0060
Mandor L.04 OH 0.0090
JUMLAH TENAGA KER
B BAHAN
Kayu kelas III m3 0.0020
Paku 5 - 12 Cm Kg 0.0100
Minyak bekisting Liter 1.2000
Besi beton polos Kg 3.0000
Kawat beton Kg 0.4500
Semen Portland Kg 4.0000
Pasir beton m3 0.0060
Kerikil m3 0.0090
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN PEKERJAAN PASANGAN DINDING
A TENAGA
Pekerja L.01 OH 0.3000
Tukang L.02 OH 0.1000
Kepala tukang L.03 OH 0.0100
Mandor L.04 OH 0.0150
JUMLAH TENAGA KER
B BAHAN
Bata Merah Bh 70.0000
Semen Portland Kg 18.9500
Pasir Pasang m3 0.0380
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000
Tukang L.02 OH 0.1000
Kepala tukang L.03 OH 0.0100
Mandor L.04 OH 0.0150
JUMLAH TENAGA KER
B BAHAN
Bata Merah m3 70.0000
Semen Portland Kg 11.5000
Pasir Pasang m3 0.0430
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000
Tukang L.02 OH 0.1500
Kepala tukang L.03 OH 0.0150
Mandor L.04 OH 0.0150
JUMLAH TENAGA KER
B BAHAN
Semen Portland Kg 10.2240
Pasir Pasang m3 0.0200
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000
Tukang L.02 OH 0.1500
Kepala tukang L.03 OH 0.0150
Mandor L.04 OH 0.0150
JUMLAH TENAGA KER
B BAHAN
Semen Portland Kg 6.2400
Pasir Pasang m3 0.0240
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1500
Tukang L.02 OH 0.0750
Kepala tukang L.03 OH 0.0080
Mandor L.04 OH 0.0080
JUMLAH TENAGA KER
B BAHAN
Semen Portland Kg 3.1080
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.7000
Tukang L.02 OH 0.3500
Kepala tukang L.03 OH 0.0350
Mandor L.04 OH 0.0350
JUMLAH TENAGA KER
B BAHAN
keramik ukuran 30 Cm x 30 Cm Doos 1.0500
Semen Portland Kg 10.0000
Pasir Pasang m3 0.0450
Semen warna (tepung affa) Kg 0.5000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.7000
Tukang L.02 OH 0.3500
Kepala tukang L.03 OH 0.0350
Mandor L.04 OH 0.0350
JUMLAH TENAGA KER
B BAHAN
keramik ukuran 40 Cm x 40 Cm Bh 6.2500
Semen Portland Kg 10.0000
Pasir Pasang m3 0.0450
Semen warna (tepung affa) Kg 1.5000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.7000
Tukang L.02 OH 0.3500
Kepala tukang L.03 OH 0.0350
Mandor L.04 OH 0.0350
JUMLAH TENAGA KER
B BAHAN
keramik ukuran 20 Cm x 20 Cm Doos 1.0500
Semen Portland Kg 10.4000
Pasir Pasang m3 0.0450
Semen warna (tepung affa) Kg 0.5000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1000
Tukang L.02 OH 0.1000
Kepala tukang L.03 OH 0.0100
Mandor L.04 OH 0.0050
JUMLAH TENAGA KER
B BAHAN
Tripleks Lembar 0.3750
Paku triplek Kg 0.0300
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1200
Tukang L.02 OH 0.0600
Kepala tukang L.03 OH 0.0060
Mandor L.04 OH 0.0060
JUMLAH TENAGA KER
B BAHAN
Seng gel 3" x 6" Lbr 0.7000
Paku biasa 1/2" - 1" Kg 0.0200
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1500
Tukang L.02 OH 0.0700
Kepala tukang L.03 OH 0.0070
Mandor L.04 OH 0.0060
JUMLAH TENAGA KER
B BAHAN
Seng gel 3" x 6" bjls 28 Lbr 0.3000
Paku biasa 1/2" - 1" Kg 0.0400
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 7.0000
Tukang L.02 OH 21.0000
Kepala tukang L.03 OH 2.1000
Mandor L.04 OH 0.3500
JUMLAH TENAGA KER
B BAHAN
Balok kayu m3 1.1000
Paku 10 Cm Kg 1.2500
Lem kayu Kg 1.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 6.0000
Tukang L.02 OH 18.0000
Kepala tukang L.03 OH 1.8000
Mandor L.04 OH 0.3000
JUMLAH TENAGA KER
B BAHAN
Balok kayu m3 1.2000
Paku 10 Cm Kg 1.2500
Lem kayu Kg 1.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.0000
Tukang L.02 OH 3.0000
Kepala tukang L.03 OH 0.3000
Mandor L.04 OH 0.0500
JUMLAH TENAGA KER
B BAHAN
Papan kayu m3 0.0400
Lem kayu Kg 0.0500
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.8000
Tukang L.02 OH 2.4000
Kepala tukang L.03 OH 0.2400
Mandor L.04 OH 0.0400
JUMLAH TENAGA KER
B BAHAN
Papan kayu m3 0.0400
Lem kayu Kg 0.0500
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.6700
Tukang L.02 OH 2.0000
Kepala tukang L.03 OH 0.2000
Mandor L.04 OH 0.3350
JUMLAH TENAGA KER
B BAHAN
Papan kayu m3 0.0600
Paku 1 Cm - 2,5 Cm Kg 0.1500
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 4.0000
Tukang L.02 OH 12.0000
Kepala tukang L.03 OH 1.2000
Mandor L.04 OH 0.2000
JUMLAH TENAGA KER
B BAHAN
Balok kayu m3 1.1000
Besi strip tebal 5 mm Kg 15.0000
Paku 12 Cm Kg 5.6000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 6.7000
Tukang L.02 OH 20.1000
Kepala tukang L.03 OH 2.0100
Mandor L.04 OH 0.3350
JUMLAH TENAGA KER
B BAHAN
Balok kayu m3 1.2000
Besi strip tebal 5 mm Kg 15.0000
Paku 12 Cm Kg 5.6000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 6.7000
Tukang L.02 OH 20.1000
Kepala tukang L.03 OH 2.0100
Mandor L.04 OH 0.3350
JUMLAH TENAGA KER
B BAHAN
Balok kayu m3 1.1000
Besi strip tebal 5 mm Kg 15.0000
Paku 12 Cm Kg 3.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2000
Tukang L.02 OH 0.3000
Kepala tukang L.03 OH 0.0300
Mandor L.04 OH 0.0100
JUMLAH TENAGA KER
B BAHAN
Kaso-kaso 5 x 7 Cm m3 0.0163
Paku 7 dan 10 Cm Kg 0.2500
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1000
Tukang L.02 OH 0.2000
Kepala tukang L.03 OH 0.0200
Mandor L.04 OH 0.0050
JUMLAH TENAGA KER
B BAHAN
Papan kayu m3 0.0110
Paku 5 dan 10 Cm Kg 0.0500
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.5000
Kepala tukang L.03 OH 0.0500
Mandor L.04 OH 0.0050
JUMLAH TENAGA KER
B BAHAN
Kunci tanam biasa Bh 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0050
Tukang L.02 OH 0.5000
Kepala tukang L.03 OH 0.0500
Mandor L.04 OH 0.0030
JUMLAH TENAGA KER
B BAHAN
Kunci tanam KM Bh 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0150
Tukang L.02 OH 0.1500
Kepala tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
JUMLAH TENAGA KER
B BAHAN
Engsel pintu Bh 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.1000
Kepala tukang L.03 OH 0.0100
Mandor L.04 OH 0.0005
JUMLAH TENAGA KER
B BAHAN
Engsel kupu-kupu Bh 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0150
Tukang L.02 OH 0.1500
Kepala tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
JUMLAH TENAGA KER
B BAHAN
Grendel Jendela Bh 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0150
Tukang L.02 OH 0.1500
Kepala tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
JUMLAH TENAGA KER
B BAHAN
Grendel Jendela Bh 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
JENIS PEKERJAAN : A.4.6.2.7 Pemasangan 1 buah engsel angin
SATUAN : Bh
HARGA SATUAN : Rp 51,013
A TENAGA
Pekerja L.01 OH 0.1000
Tukang L.02 OH 0.2000
Kepala tukang L.03 OH 0.0200
Mandor L.04 OH 0.0005
JUMLAH TENAGA KER
B BAHAN
Engsel angin Bh 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0150
Tukang L.02 OH 0.1500
Kepala tukang L.03 OH 0.0150
Mandor L.04 OH 0.0080
JUMLAH TENAGA KER
B BAHAN
Kait angin Bh 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0150
Tukang L.02 OH 0.1500
Kepala tukang L.03 OH 0.0150
Mandor L.04 OH 0.0080
JUMLAH TENAGA KER
B BAHAN
Tarikan Jendela Bh 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 0% x Jumlah
F Harga Satuan Pekerjaan (D+E)
JENIS PEKERJAAN : A.4.6.2.16 Pemasangan 1 m2 kaca tebal 3 mm
SATUAN : M2
HARGA SATUAN : Rp 109,995
A TENAGA
Pekerja L.01 OH 0.0150
Tukang L.02 OH 0.1500
Kepala tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
JUMLAH TENAGA KER
B BAHAN
Kaca tebal 3 mm m2 1.1000
Sealant Kg 0.0500
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1500
Mandor L.04 OH 0.0030
JUMLAH TENAGA KER
B BAHAN
Soda api Kg 0.0500
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0700
Tukang L.02 OH 0.0090
Kepala tukang L.03 OH 0.0060
Mandor L.04 OH 0.0030
JUMLAH TENAGA KER
B BAHAN
Cat menie Kg 0.2000
Plamuur Kg 0.1500
Cat dasar Kg 0.1700
Cat penutup Kg 0.2600
Kuas Bh 0.0100
Pengencer ltr 0.0300
Ampelas Lbr 0.2000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0700
Tukang L.02 OH 0.1050
Kepala tukang L.03 OH 0.0040
Mandor L.04 OH 0.0030
JUMLAH TENAGA KER
B BAHAN
Cat menie Kg 0.2000
Plamuur Kg 0.1500
Cat dasar Kg 0.1700
Cat penutup Kg 0.3500
Kuas Bh 0.0100
Pengencer Kg 0.0300
Ampelas Lbr 0.2000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0200
Tukang L.02 OH 0.0630
Kepala tukang L.03 OH 0.0063
Mandor L.04 OH 0.0030
JUMLAH TENAGA KER
B BAHAN
Plamuur Kg 0.1000
Cat dasar Kg 0.1000
Cat penutup Kg 0.2600
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0280
Tukang L.02 OH 0.0420
Kepala tukang L.03 OH 0.0042
Mandor L.04 OH 0.0030
JUMLAH TENAGA KER
B BAHAN
Cat dasar Kg 0.1200
Cat penutup Kg 0.1800
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.0000
Tukang L.02 OH 1.5000
Kepala tukang L.03 OH 0.1500
Mandor L.04 OH 0.1600
JUMLAH TENAGA KER
B BAHAN
Closet jongkok Unit 1.0000
Semen Portland Kg 6.0000
Pasir Pasang m3 0.0100
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.0000
Tukang L.02 OH 1.5000
Kepala tukang L.03 OH 0.1500
Mandor L.04 OH 0.0500
JUMLAH TENAGA KER
B BAHAN
Closet jongkok Unit 1.0000
Semen Portland Kg 6.0000
Pasir Pasang m3 0.0100
Bata Merah Bh 7.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000
Tukang L.02 OH 0.4500
Kepala tukang L.03 OH 0.0450
Mandor L.04 OH 0.0150
JUMLAH TENAGA KER
B BAHAN
Bak fibreglass Unit 1.0000
Perlengkapan % 12.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 3.5000
Tukang L.02 OH 4.5000
Kepala tukang L.03 OH 0.0500
Mandor L.04 OH 0.0180
JUMLAH TENAGA KER
B BAHAN
Beton 1:2:3 m3 0.9000
Besi Beton Kg 180.0000
Kayu bekisting m2 8.0000
Ubin porselen bh 500.0000
Perlengkapan % 10.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.1000
Kepala tukang L.03 OH 0.0100
Mandor L.04 OH 0.0050
JUMLAH TENAGA KER
B BAHAN
Floor Drain Unit 1.0000
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.4000
Kepala tukang L.03 OH 0.0400
Mandor L.04 OH 0.0050
JUMLAH TENAGA KER
B BAHAN
Kran Air m 1.0000
Sealtape Bh 0.0250
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0360
Tukang L.02 OH 0.0600
Kepala tukang L.03 OH 0.0060
Mandor L.04 OH 0.0020
JUMLAH TENAGA KER
B BAHAN
Pipa PVC 1/2" M 1.2000
Perlengkapan % 35.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit #REF! x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0360
Tukang L.02 OH 0.0600
Kepala tukang L.03 OH 0.0060
Mandor L.04 OH 0.0020
JUMLAH TENAGA KER
B BAHAN
Pipa PVC 3/4" m 1.2000
Perlengkapan % 35.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit #REF! x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Upah % 100.0000
A TENAGA
Upah % 100.0000
A TENAGA
Pekerja L.01 OH 0.3500
Tukang bsi L.02 OH 0.3500
Kepala tukang L.03 OH 0.0035
Mandor L.04 OH 0.0018
JUMLAH TENAGA KER
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000
Assesoris (perkuatan, las dll) Ls 1.0000
JUMLAH HARGA BAH
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH (A+B+C)
E Overhead & profit 10% x Jumlah
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.1000
Tukang Kayu L.02 OH 0.0250
Kepala tukang L.03 OH 0.0025
Mandor L.04 OH 0.0050
JUMLAH TENAGA KER
B BAHAN
A TENAGA
Pekerja L.01 OH 0.2000
Tukang Kayu L.02 OH 0.0100
Kepala tukang L.03 OH 0.0010
Mandor L.04 OH 0.0010
JUMLAH TENAGA KER
B BAHAN
JUMLAH HARGA BAH
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.6500
Tukang Batu L.02 OH 0.2750
Kepala tukang L.03 OH 0.0280
Mandor L.04 OH 0.0830
JUMLAH TENAGA KER
B BAHAN
Kerikil ( Maks 30 mm ) Kg 1047
Semen Portland Kg 371
Pasir Beton Kg 698
Air Ltr 215
JUMLAH HARGA BAH
C PERALATAN
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 8,500.00
150,000.00 7,500.00
JUMLAH TENAGA KERJA 16,000.00
-
JUMLAH HARGA BAHAN -
-
JUMLAH HARGA ALAT -
16,000.00
1,600.00
17,600.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 566,695.00
150,000.00 49,950.00
JUMLAH TENAGA KERJA 616,645.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 63,750.00
150,000.00 3,750.00
JUMLAH TENAGA KERJA 67,500.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 42,500.00
150,000.00 7,500.00
JUMLAH TENAGA KERJA 50,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
-
-
-
-
JUMLAH TENAGA KERJA -
-
-
-
JUMLAH HARGA BAHAN -
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
-
-
-
-
JUMLAH TENAGA KERJA -
-
-
JUMLAH HARGA BAHAN -
-
Membuat beton mutu f3c = 7,4 Mpa (K 100), slump (12 ± 2) Cm, w/c 0,87
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 140,250.00
125,000.00 34,375.00
140,000.00 3,920.00
140,000.00 11,620.00
JUMLAH TENAGA KERJA 190,165.00
1,240.00 306,280.00
159,000.00 138,171,000.00
-
-
JUMLAH HARGA BAHAN 138,477,280.00
138,667,445.00
Membuat beton mutu f3c = 9,8 Mpa (K 125), slump (12 ± 2) Cm, w/c 0,78
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 140,250.00
125,000.00 34,375.00
140,000.00 3,920.00
140,000.00 11,620.00
JUMLAH TENAGA KERJA 190,165.00
1,240.00 342,240.00
-
- -
- -
JUMLAH HARGA BAHAN 342,240.00
532,405.00
Membuat beton mutu f3c = 12,2 Mpa (K 150), slump (12 ± 2) Cm, w/c 0,72
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 140,250.00
125,000.00 34,375.00
140,000.00 3,920.00
140,000.00 11,620.00
JUMLAH TENAGA KERJA 190,165.00
1,240.00 370,760.00
- -
- -
- -
JUMLAH HARGA BAHAN 370,760.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 102,000.00
125,000.00 25,000.00
140,000.00 2,800.00
140,000.00 8,400.00
JUMLAH TENAGA KERJA 138,200.00
1,240.00 285,200.00
- -
- -
- -
JUMLAH HARGA BAHAN 285,200.00
Membuat Lantai kerja beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 140,250.00
125,000.00 34,375.00
140,000.00 3,920.00
140,000.00 11,620.00
JUMLAH TENAGA KERJA 190,165.00
1,240.00 404,240.00
- -
- -
- -
JUMLAH HARGA BAHAN 404,240.00
85,000.00 5,950.00
125,000.00 8,750.00
140,000.00 980.00
150,000.00 600.00
JUMLAH TENAGA KERJA 16,280.00
10,500.00 110,250.00
20,000.00 3,000.00
JUMLAH HARGA BAHAN 113,250.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 44,200.00
125,000.00 32,500.00
140,000.00 3,640.00
150,000.00 3,900.00
JUMLAH TENAGA KERJA 84,240.00
2,000,000.00 90,000.00
20,000.00 6,000.00
10,000.00 1,000.00
JUMLAH HARGA BAHAN 97,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 56,100.00
125,000.00 41,250.00
140,000.00 4,620.00
150,000.00 4,950.00
JUMLAH TENAGA KERJA 106,920.00
2,000,000.00 80,000.00
20,000.00 8,000.00
10,000.00 2,000.00
2,300,000.00 34,500.00
118,000.00 41,300.00
10,000.00 20,000.00
JUMLAH HARGA BAHAN 185,800.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 56,100.00
125,000.00 41,250.00
140,000.00 4,620.00
150,000.00 4,950.00
JUMLAH TENAGA KERJA 106,920.00
2,000,000.00 80,000.00
20,000.00 8,000.00
10,000.00 2,000.00
2,300,000.00 41,400.00
118,000.00 41,300.00
10,000.00 20,000.00
JUMLAH HARGA BAHAN 192,700.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 56,100.00
125,000.00 41,250.00
140,000.00 4,620.00
150,000.00 4,950.00
JUMLAH TENAGA KERJA 106,920.00
2,000,000.00 80,000.00
20,000.00 8,000.00
10,000.00 2,000.00
2,300,000.00 34,500.00
118,000.00 41,300.00
10,000.00 60,000.00
JUMLAH HARGA BAHAN 225,800.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 15,300.00
125,000.00 2,500.00
125,000.00 2,500.00
125,000.00 2,500.00
140,000.00 840.00
150,000.00 1,350.00
JUMLAH TENAGA KERJA 24,990.00
2,150,000.00 4,300.00
20,000.00 200.00
10,000.00 12,000.00
10,500.00 31,500.00
20,000.00 9,000.00
1,240.00 4,960.00
159,000.00 954.00
145,000.00 1,305.00
JUMLAH HARGA BAHAN 64,219.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 25,500.00
125,000.00 12,500.00
140,000.00 1,400.00
150,000.00 2,250.00
JUMLAH TENAGA KERJA 41,650.00
750.00 52,500.00
1,240.00 23,498.00
159,000.00 6,042.00
JUMLAH HARGA BAHAN 82,040.00
Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 25,500.00
125,000.00 12,500.00
140,000.00 1,400.00
150,000.00 2,250.00
JUMLAH TENAGA KERJA 41,650.00
750.00 52,500.00
1,240.00 14,260.00
159,000.00 6,837.00
JUMLAH HARGA BAHAN 73,597.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 25,500.00
125,000.00 18,750.00
140,000.00 2,100.00
150,000.00 2,250.00
JUMLAH TENAGA KERJA 48,600.00
1,240.00 12,677.76
159,000.00 3,180.00
JUMLAH HARGA BAHAN 15,857.76
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 25,500.00
125,000.00 18,750.00
140,000.00 2,100.00
150,000.00 2,250.00
JUMLAH TENAGA KERJA 48,600.00
1,240.00 7,737.60
159,000.00 3,816.00
JUMLAH HARGA BAHAN 11,553.60
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 12,750.00
125,000.00 9,375.00
140,000.00 1,120.00
150,000.00 1,200.00
JUMLAH TENAGA KERJA 24,445.00
1,240.00 3,853.92
JUMLAH HARGA BAHAN 3,853.92
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 17,000.00
125,000.00 12,500.00
140,000.00 1,400.00
150,000.00 1,500.00
JUMLAH TENAGA KERJA 32,400.00
1,240.00 4,030.00
JUMLAH HARGA BAHAN 4,030.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 59,500.00
125,000.00 43,750.00
140,000.00 4,900.00
150,000.00 5,250.00
JUMLAH TENAGA KERJA 113,400.00
-
-
-
-
JUMLAH HARGA BAHAN -
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
89,000.00 62,300.00
124,950.00 43,732.50
143,500.00 5,022.50
143,500.00 5,022.50
JUMLAH TENAGA KERJA 116,077.50
17,600.00 110,000.00
1,240.00 12,400.00
159,000.00 7,155.00
15,000.00 22,500.00
JUMLAH HARGA BAHAN 152,055.00
-
-
-
-
JUMLAH TENAGA KERJA -
-
-
-
-
JUMLAH HARGA BAHAN -
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 8,500.00
125,000.00 12,500.00
140,000.00 1,400.00
150,000.00 750.00
JUMLAH TENAGA KERJA 23,150.00
58,000.00 21,750.00
15,000.00 450.00
JUMLAH HARGA BAHAN 22,200.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 4,250.00
125,000.00 6,250.00
140,000.00 700.00
150,000.00 450.00
JUMLAH TENAGA KERJA 11,650.00
15,000.00 54,000.00
20,000.00 3,000.00
JUMLAH HARGA BAHAN 57,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 10,200.00
125,000.00 7,500.00
140,000.00 840.00
150,000.00 900.00
JUMLAH TENAGA KERJA 19,440.00
48,000.00 33,600.00
20,000.00 400.00
JUMLAH HARGA BAHAN 34,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 12,750.00
125,000.00 8,750.00
140,000.00 980.00
150,000.00 900.00
JUMLAH TENAGA KERJA 23,380.00
48,000.00 14,400.00
20,000.00 800.00
JUMLAH HARGA BAHAN 15,200.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 595,000.00
125,000.00 2,625,000.00
140,000.00 294,000.00
150,000.00 52,500.00
JUMLAH TENAGA KERJA 3,566,500.00
3,000,000.00 3,300,000.00
20,000.00 25,000.00
12,000.00 12,000.00
JUMLAH HARGA BAHAN 3,337,000.00
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 510,000.00
125,000.00 2,250,000.00
140,000.00 252,000.00
150,000.00 45,000.00
JUMLAH TENAGA KERJA 3,057,000.00
2,300,000.00 2,760,000.00
20,000.00 25,000.00
12,000.00 12,000.00
JUMLAH HARGA BAHAN 2,797,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 85,000.00
125,000.00 375,000.00
140,000.00 42,000.00
150,000.00 7,500.00
JUMLAH TENAGA KERJA 509,500.00
3,000,000.00 120,000.00
12,000.00 600.00
JUMLAH HARGA BAHAN 120,600.00
Pembuatan dan Pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I dan II
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 68,000.00
125,000.00 300,000.00
140,000.00 33,600.00
150,000.00 6,000.00
JUMLAH TENAGA KERJA 407,600.00
3,000,000.00 120,000.00
12,000.00 600.00
JUMLAH HARGA BAHAN 120,600.00
Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 85,000.00
125,000.00 375,000.00
140,000.00 42,000.00
150,000.00 7,500.00
JUMLAH TENAGA KERJA 509,500.00
3,000,000.00 192,000.00
12,000.00 6,000.00
JUMLAH HARGA BAHAN 198,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 56,950.00
125,000.00 250,000.00
140,000.00 28,000.00
150,000.00 50,250.00
JUMLAH TENAGA KERJA 385,200.00
3,000,000.00 180,000.00
20,000.00 3,000.00
JUMLAH HARGA BAHAN 183,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 340,000.00
125,000.00 1,500,000.00
140,000.00 168,000.00
150,000.00 30,000.00
JUMLAH TENAGA KERJA 2,038,000.00
3,000,000.00 3,300,000.00
-
-
JUMLAH HARGA BAHAN 3,300,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 569,500.00
125,000.00 2,512,500.00
140,000.00 281,400.00
150,000.00 50,250.00
JUMLAH TENAGA KERJA 3,413,650.00
-
- -
- -
JUMLAH HARGA BAHAN -
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
-
-
-
-
JUMLAH TENAGA KERJA -
-
- -
-
JUMLAH HARGA BAHAN -
Pemasangan 1 m2 rangka langit-langit (60 x 60) Cm, kayu kelas II atau III
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 17,000.00
125,000.00 37,500.00
140,000.00 4,200.00
150,000.00 1,500.00
JUMLAH TENAGA KERJA 60,200.00
2,400,000.00 39,120.00
20,000.00 5,000.00
JUMLAH HARGA BAHAN 44,120.00
85,000.00 8,500.00
125,000.00 25,000.00
140,000.00 2,800.00
150,000.00 750.00
JUMLAH TENAGA KERJA 37,050.00
2,400,000.00 26,400.00
20,000.00 1,000.00
JUMLAH HARGA BAHAN 27,400.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 850.00
125,000.00 62,500.00
140,000.00 7,000.00
150,000.00 750.00
JUMLAH TENAGA KERJA 71,100.00
100,000.00 100,000.00
JUMLAH HARGA BAHAN 100,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 425.00
125,000.00 62,500.00
140,000.00 7,000.00
150,000.00 450.00
JUMLAH TENAGA KERJA 70,375.00
80,000.00 80,000.00
JUMLAH HARGA BAHAN 80,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 1,275.00
125,000.00 18,750.00
140,000.00 2,100.00
150,000.00 120.00
JUMLAH TENAGA KERJA 22,245.00
20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 850.00
125,000.00 12,500.00
140,000.00 1,400.00
150,000.00 75.00
JUMLAH TENAGA KERJA 14,825.00
10,000.00 10,000.00
JUMLAH HARGA BAHAN 10,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 1,275.00
125,000.00 18,750.00
140,000.00 2,100.00
150,000.00 120.00
JUMLAH TENAGA KERJA 22,245.00
15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 1,275.00
125,000.00 18,750.00
140,000.00 2,100.00
150,000.00 120.00
JUMLAH TENAGA KERJA 22,245.00
10,000.00 10,000.00
JUMLAH HARGA BAHAN 10,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 8,500.00
125,000.00 25,000.00
140,000.00 2,800.00
150,000.00 75.00
JUMLAH TENAGA KERJA 36,375.00
10,000.00 10,000.00
JUMLAH HARGA BAHAN 10,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 1,275.00
125,000.00 18,750.00
140,000.00 2,100.00
150,000.00 1,200.00
JUMLAH TENAGA KERJA 23,325.00
15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 1,275.00
125,000.00 18,750.00
140,000.00 2,100.00
150,000.00 1,200.00
JUMLAH TENAGA KERJA 23,325.00
25,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 1,275.00
125,000.00 18,750.00
140,000.00 2,100.00
150,000.00 120.00
JUMLAH TENAGA KERJA 22,245.00
70,000.00 77,000.00
15,000.00 750.00
JUMLAH HARGA BAHAN 77,750.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 12,750.00
150,000.00 450.00
JUMLAH TENAGA KERJA 13,200.00
15,000.00 750.00
JUMLAH HARGA BAHAN 750.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 5,950.00
125,000.00 1,125.00
140,000.00 840.00
150,000.00 450.00
JUMLAH TENAGA KERJA 8,365.00
35,000.00 7,000.00
50,000.00 7,500.00
250,000.00 42,500.00
60,000.00 15,600.00
10,000.00 100.00
20,000.00 600.00
8,000.00 1,600.00
JUMLAH HARGA BAHAN 74,900.00
Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,3 lapis cat penutup)
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 5,950.00
125,000.00 13,125.00
140,000.00 560.00
150,000.00 450.00
JUMLAH TENAGA KERJA 20,085.00
35,000.00 7,000.00
50,000.00 7,500.00
250,000.00 42,500.00
60,000.00 21,000.00
10,000.00 100.00
20,000.00 600.00
8,000.00 1,600.00
JUMLAH HARGA BAHAN 80,300.00
Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 1,700.00
125,000.00 7,875.00
140,000.00 882.00
150,000.00 450.00
JUMLAH TENAGA KERJA 10,907.00
50,000.00 5,000.00
250,000.00 25,000.00
550,000.00 143,000.00
JUMLAH HARGA BAHAN 173,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 2,380.00
125,000.00 5,250.00
140,000.00 588.00
150,000.00 450.00
JUMLAH TENAGA KERJA 8,668.00
250,000.00 30,000.00
550,000.00 99,000.00
JUMLAH HARGA BAHAN 129,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 85,000.00
125,000.00 187,500.00
140,000.00 21,000.00
150,000.00 24,000.00
JUMLAH TENAGA KERJA 317,500.00
220,000.00 220,000.00
1,240.00 7,440.00
159,000.00 1,590.00
JUMLAH HARGA BAHAN 229,030.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
-
-
-
-
JUMLAH TENAGA KERJA -
-
-
-
-
JUMLAH HARGA BAHAN -
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 25,500.00
125,000.00 56,250.00
140,000.00 6,300.00
150,000.00 2,250.00
JUMLAH TENAGA KERJA 90,300.00
240,000.00 240,000.00
100,000.00 12,000.00
JUMLAH HARGA BAHAN 252,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 297,500.00
125,000.00 562,500.00
140,000.00 7,000.00
150,000.00 2,700.00
JUMLAH TENAGA KERJA 869,700.00
-
-
-
-
-
JUMLAH HARGA BAHAN -
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
-
-
-
-
JUMLAH TENAGA KERJA -
89,100.00 89,100.00
JUMLAH HARGA BAHAN 89,100.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 850.00
125,000.00 50,000.00
140,000.00 5,600.00
150,000.00 750.00
JUMLAH TENAGA KERJA 57,200.00
15,000.00 15,000.00
12,000.00 300.00
JUMLAH HARGA BAHAN 15,300.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
-
-
-
-
JUMLAH TENAGA KERJA -
-
-
JUMLAH HARGA BAHAN -
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
- -
- -
- -
- -
JUMLAH TENAGA KERJA -
-
-
JUMLAH HARGA BAHAN -
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 29,750.00
125,000.00 43,750.00
140,000.00 490.00
150,000.00 270.00
JUMLAH TENAGA KERJA 74,260.00
19,000.00 76,000.00
30,000.00 30,000.00
JUMLAH HARGA BAHAN 106,000.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 8,500.00
125,000.00 3,125.00
140,000.00 350.00
150,000.00 750.00
JUMLAH TENAGA KERJA 12,725.00
-
-
JUMLAH HARGA BAHAN -
Pembongkaran 1 m2 plafond
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 17,000.00
125,000.00 1,250.00
140,000.00 140.00
150,000.00 150.00
JUMLAH TENAGA KERJA 18,540.00
-
-
JUMLAH HARGA BAHAN -
Membuat Lantai kerja beton mutu f3c = 19,3 Mpa (K 225), slump (12 ± 2) Cm,
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
85,000.00 140,250.00
125,000.00 34,375.00
140,000.00 3,920.00
150,000.00 12,450.00
JUMLAH TENAGA KERJA 190,995.00
107.41 112,455.56
1,240.00 460,040.00
113.57 79,272.86
18.00 3,870.00
JUMLAH HARGA BAHAN 655,638.41
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN BONGKARAN
1 Pek Bongkaran Rangka Atap
2 Pembongkaran 1 m3 dinding tembok bata
3 Pek Bongkaran Plafond
4 Pek Bongkaran Keramik
IV PEKERJAAN PONDASI
V PEKERJAAN BETON
1 Membuat beton mutu f3c = 9,8 Mpa (K 125), slump (12 ± 2) Cm, w/c 0,78
2 Membuat beton mutu f3c = 12,2 Mpa (K 150), slump (12 ± 2) Cm, w/c 0,72
3 Pembesian 10 kg dengan besi polos atau besi ulir
4 Pembesian 1 kg dengan besi polos atau besi ulir
4 Pemasangan 1 m2 bekisting untuk pondasi
5 Pemasangan 1 m2 bekisting untuk sloof
6 Pemasangan 1 m2 bekisting untuk kolom
7 Pemasangan 1 m2 bekisting untuk balok
8 Pemasangan 1 m2 bekisting untuk Lantai
9 Membuat 1 m kolom praktis beton bertulang (11 x 11) Cm
10 Membuat 1 m ring balok beton bertulang (10 x 15) Cm
X PEKERJAAN PLAFOND
1 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) Cm, tebal 3 mm,
2 Pas. List Plafond 1x2x400 Cm
3 List Profil Sudut 3x3,5x400 Cm
4 Pemasangan 1 m2 rangka langit-langit (60 x 60) Cm, kayu kelas II atau III
A.2.2.1.13 M3 Rp 13,997.50
ing tembok bata A.2.2.1.14 M3 Rp 678,309.50
M3 Rp 20,394.00
M3
g Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC :A.4.4.1.7 M2 Rp 136,059.00
g Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC :A.4.4.1.9 M2 Rp 126,771.70
langit tripleks ukuran (120 x 240) Cm, tebal 3 mm, 4 m A.4.5.1.5 M2 Rp 52,152.50
M'
M'
a langit-langit (60 x 60) Cm, kayu kelas II atau III A.4.6.1.20 M2 Rp 114,752.00
gan 1 m3 kusen pintu dan kusen jendela, kayu kls I A.4.6.1.1 M3 Rp 7,593,850.00
gan 1 m3 kusen pintu dan kusen jendela, kayu kelas II ata
A.4.6.1.2 M3 Rp 6,439,400.00
gan 1 m2 daun pintu panel, kayu kelas I atau II A.4.6.1.5 M2 Rp 693,110.00
gan 1 m2 pintu dan jendela kaca, kayu kelas I dan II A.4.6.1.6 M2 Rp 581,020.00
kusen, kayu kelas I atau II A.4.6.1.10 M2 Rp 778,250.00
uksi kuda-kuda konvensional, kayu kls I, II dan III A.4.6.1.13 M3
uksi gordeng, kayu kelas II A.4.6.1.15 M3
a langit-langit (50 x 100) Cm, kayu kelas II atau III A.4.6.1.19 M2
k ukuran (3 x 30) Cm, kayu kelas I atau kelas II A.4.6.1.22 M1 Rp 74,117.50
AM GEDUNG
et Duduk Merk Toto A.5.1.1.1 Bh
et Jongkok Merk Toto A.5.1.1.2 Bh Rp 601,183.00
air fibreglass vol 1 m3 A.5.1.1.3 Bh Rp 376,530.00
fibreglass vol 1 m3 A.5.1.1.7 Bh
A.5.1.1.14 Bh
diameter 1/2" atau 3/4" A.5.1.1.19 M1 Rp 79,750.00
VC tipe AW diameter 1/2" A.5.1.1.25 M1
VC tipe AW diameter 3/4" A.5.1.1.26 M1
VC tipe AW diameter 1" A.5.1.1.27 M1
VC tipe AW diameter 1½" A.5.1.1.28 M1
VC tipe AW diameter 2" A.5.1.1.29 M1
VC tipe AW diameter 2½" A.5.1.1.30 M1
VC tipe AW diameter 3" A.5.1.1.31 M1
KET
BACK UP DATA
KEGIATAN : -
PEKERJAAN : REHAP RUANG KELAS MTsN 4
LOKASI : MTs N 4 KEC. BONJOL KAB. PASAMAN
I PEKERJAAN PENDAHULUAN
II PEKERJAAN BETON
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M
Beugel Ø8 mm Berat/M
Pjg Tlg Pokok = 4.00 x
Beugel = 0.49 x
Berat Total Tlg Pokok = 27.20 x
Berat Total Beugel = 23.03 x
3. Cetakan = 0.15 x
2 Pek. Kolom 15/20 cm Teras
1. Beton 1:2:3
= P = 0.20
T = 3.40
L = 0.15
Jml KLm = 1.00
V = 0.20 x
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M
Beugel Ø8 mm Berat/M
Pjg Tlg Pokok = 4.00 x
Beugel = 0.59 x
Berat Total Tlg Pokok = 13.60 x
Berat Total Beugel = 14.16 x
3. Cetakan = 0.70 x
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M
Beugel Ø8 mm Berat/M
Pjg Tlg Pokok = 4.00 x
Beugel = 0.49 x
Berat Total Tlg Pokok = 12.00 x
Berat Total Beugel = 10.29 x
3. Cetakan = 0.20 x
Err:5 Err:509
= Pintu & Jendela
P1 = 0.05 x 0.13 x
J1 = 0.05 x 0.13 x
V1 = 0.05 x 0.13 x
IV PEKERJAAN KAP/ATAP
1 Pas, Kuda-Kuda Baja Ringan Zincalum
Tampak Depan = Tampak Belakang
BAG. ATAS Panjang atas = 13.9
Panjang bawah = 13.9
Panjang Rata2 = 13.9
- Acian 1 M2
= Pada Kolom 15/15
= 0.30 x 3.65 x 2.00 =
Kolom 20/20 Teras
= 0.80 x 3.65 x 1.00 =
Teras Depan
= 0.07 x 1.85 x 8.85 x
- Pintu Panil
P. 1
= 1.42 x 2.11 x 3.00 =
IX PEKERJAAN PENGECATAN
- Mencat Kayu Yang Kelihatan dgn Cat Minyak = Kozen Pintu & jendela
P. 1
= 0.25 x 7.10 x 3.00 =
0.4 x 2.10 x 3.00 =
J. 1
0.25 x 8.10 x 12.00 =
0.4 x 5.50 x 12.00 =
V. 1
0.25 x 6.40 x 3.00 =
0.4 x 1.20 x 3.00 =
- Mencat Dinding dgn Cat Tembok = Volume Plester 1:2 + Plester 1:4 +
= 41.95 + 331.14 + 5.11
= 348.00 Ls 287
= 336.05 Ls
= 243.00 Ls
Berat/M = 0.89 Kg
Berat/M = 0.39 Kg
6.80 = 27.20 m
47 = 23.03 m
0.89 = 24.14707 Kg
0.39 = 9.086717 Kg
33.23379 Kg 33.23 Kg
Berat/M = 0.89 Kg
Berat/M = 0.39 Kg
3.40 = 13.60 m
24 = 14.16 m 1.05
0.89 = 12.07354 Kg
0.39 = 5.58697 Kg
17.66051 Kg 17.66 Kg 19.35
Berat/M = 0.89 Kg
Berat/M = 0.39 Kg
3.00 = 12.00 m
21 = 10.29 m
0.89 = 10.65312 Kg
0.39 = 4.060022 Kg
14.71314 Kg 14.71 Kg
14.88
2.00 = 0.90
153.76 M2 0
0
2.00 = 7.50 0
8.00 = 32.24
2.00 = 3.64 +
153.76 - 43.38 = 110.38 M2
Lebar = 3.3 M
3.00 = 137.61 M3
Lebar = 3.47 M
2.00 = 117.29 M3
3.00 = 123.17 M3
378.06 M2
39.90
24.00
12.00
75.90 75.90 M1
= 99.69
3.00 = 180.22 394.05 M2
3.00 = 114.15
394.05
21.24 M1
319.02 M2
319.02 319.02 M2
3.00 = 42.25
= 53.70
= 16.50
112.45 M1
13.98 x 3.00 = 41.95 M2
9.85
110.38 x 3.00 = 331.14 M2
2.19
2.92 5.11 M2
3.00 = 14.59
3.00 = 0.19 -
= 14.40
3.00 = 3.44
17.84 M3
3.00 = 208.42
3.00 = 4.43
212.85 M2
8.9886
= 8.99 M2
15.36 = 5.53 M2
9.83 -
5.53
24.00 = 9.83
= 9.83 M2
3.00 = 2.45
12.00 = 17.28
3.00 = 4.32
29.24 M2
6.00 = 5.19
5.33
2.52
24.30
26.40
4.80 64.79 M2
1.44
17.64
14.72
6.12
25.20
3.15 66.83 M2
Afwerking
= 378.20 M2
319.02 = 319.02 M2
0
0
BACK UP DATA
KEGIATAN : -
PEKERJAAN : REHAP RUANG KELAS MTsN 4
LOKASI : MTs N 4 KEC. BONJOL KAB. PASAMAN
I PEKERJAAN PENDAHULUAN
II PEKERJAAN BETON
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M
Beugel Ø8 mm Berat/M
Pjg Tlg Pokok = 4.00 x
Beugel = 0.49 x
Berat Total Tlg Pokok = 27.20 x
Berat Total Beugel = 23.03 x
3. Cetakan = 0.15 x
2 Pek. Kolom 15/20 cm Teras
1. Beton 1:2:3
= P = 0.20
T = 3.40
L = 0.15
Jml KLm = 1.00
V = 0.20 x
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M
Beugel Ø8 mm Berat/M
Pjg Tlg Pokok = 4.00 x
Beugel = 0.59 x
Berat Total Tlg Pokok = 13.60 x
Berat Total Beugel = 14.16 x
3. Cetakan = 0.70 x
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M
Beugel Ø8 mm Berat/M
Pjg Tlg Pokok = 4.00 x
Beugel = 0.49 x
Berat Total Tlg Pokok = 12.00 x
Berat Total Beugel = 10.29 x
3. Cetakan = 0.20 x
Err:5 Err:509
= Pintu & Jendela
P1 = 0.05 x 0.13 x
J1 = 0.05 x 0.13 x
V1 = 0.05 x 0.13 x
IV PEKERJAAN KAP/ATAP
1 Pas, Kuda-Kuda Baja Ringan Zincalum
Tampak Depan = Tampak Belakang
BAG. ATAS Panjang atas = 13.9
Panjang bawah = 13.9
Panjang Rata2 = 13.9
- Acian 1 M2
= Pada Kolom 15/15
= 0.30 x 3.65 x 2.00 =
Kolom 20/20 Teras
= 0.80 x 3.65 x 1.00 =
Teras Depan
= 0.07 x 1.85 x 8.85 x
- Pintu Panil
P. 1
= 1.42 x 2.11 x 3.00 =
IX PEKERJAAN PENGECATAN
- Mencat Kayu Yang Kelihatan dgn Cat Minyak = Kozen Pintu & jendela
P. 1
= 0.25 x 7.10 x 3.00 =
0.4 x 2.10 x 3.00 =
J. 1
0.25 x 8.10 x 12.00 =
0.4 x 5.50 x 12.00 =
V. 1
0.25 x 6.40 x 6.00 =
0.4 x 1.20 x 6.00 =
- Mencat Dinding dgn Cat Tembok = Volume Plester 1:2 + Plester 1:4 +
= 40.09 + 244.39 + 5.11
= 416.00 M3 287
= 335.50 M3
= 252.00 M3
Berat/M = 0.89 Kg
Berat/M = 0.39 Kg
6.80 = 27.20 m
47 = 23.03 m
0.89 = 24.14707 Kg
0.39 = 9.086717 Kg
33.23379 Kg 33.23 Kg
Berat/M = 0.89 Kg
Berat/M = 0.39 Kg
3.40 = 13.60 m
24 = 14.16 m 1.05
0.89 = 12.07354 Kg
0.39 = 5.58697 Kg
17.66051 Kg 17.66 Kg 19.35
Berat/M = 0.89 Kg
Berat/M = 0.39 Kg
3.00 = 12.00 m
21 = 10.29 m
0.89 = 10.65312 Kg
0.39 = 4.060022 Kg
14.71314 Kg 14.71 Kg
14.71
3.00 = 1.35
151.99 M2 0
0
3.00 = 11.25 0
12.00 = 48.36
6.00 = 10.92 +
151.99 - 70.53 = 81.46 M2
Lebar = 3.3 M
3.00 = 137.61 M3
Lebar = 3.47 M
2.00 = 117.29 M3
3.00 = 123.17 M3
378.06 M2
59.85
36.00
18.00
113.85 113.85 M1
= 149.53
3.00 = 180.22 443.90 M2
3.00 = 114.15
443.90
21.24 M1
319.02 M2
319.02 319.02 M2
3.00 = 42.25
= 53.70
= 16.50
112.45 M1
13.36 x 3.00 = 40.09 M2
9.85
81.46 x 3.00 = 244.39 M2
2.19
2.92 5.11 M2
3.00 = 14.59
3.00 = 0.19 -
= 14.40
3.00 = 3.44
17.84 M3
3.00 = 208.42
1.00 = 57.00
265.42 M2
8.9886
= 8.99 M2
15.36 = 5.53 M2
9.83 -
5.53
24.00 = 9.83
= 9.83 M2
3.00 = 2.45
12.00 = 17.28
6.00 = 8.64
33.56 M2
6.00 = 5.19
5.33
2.52
24.30
26.40
9.60 71.03 M2
2.88
17.64
14.72
6.12
25.20
6.30 69.98 M2
Afwerking
= 289.59 M2
319.02 = 319.02 M2
0